  1. Continuity diaphragm for skewed continuous span precast prestressed concrete girder bridges.

    Science.gov (United States)

    2004-10-01

    Continuity diaphragms used on skewed bents in prestressed girder bridges cause difficulties in detailing and : construction. Details for bridges with large diaphragm skew angles (>30) have not been a problem for LA DOTD. : However, as the skew angl...

  2. Continuity diaphragm for skewed continuous span precast prestressed concrete girder bridges : technical summary report.

    Science.gov (United States)

    2004-03-01

    Most highway bridges are built as cast-in-place : reinforced concrete slabs and prestressed concrete : girders. The shear connectors on the top of the girders : assure composite action between the slabs and : girders. The design guidelines for bridge...

  3. Damage identification method for continuous girder bridges based on spatially-distributed long-gauge strain sensing under moving loads

    Science.gov (United States)

    Wu, Bitao; Wu, Gang; Yang, Caiqian; He, Yi

    2018-05-01

    A novel damage identification method for concrete continuous girder bridges based on spatially-distributed long-gauge strain sensing is presented in this paper. First, the variation regularity of the long-gauge strain influence line of continuous girder bridges which changes with the location of vehicles on the bridge is studied. According to this variation regularity, a calculation method for the distribution regularity of the area of long-gauge strain history is investigated. Second, a numerical simulation of damage identification based on the distribution regularity of the area of long-gauge strain history is conducted, and the results indicate that this method is effective for identifying damage and is not affected by the speed, axle number and weight of vehicles. Finally, a real bridge test on a highway is conducted, and the experimental results also show that this method is very effective for identifying damage in continuous girder bridges, and the local element stiffness distribution regularity can be revealed at the same time. This identified information is useful for maintaining of continuous girder bridges on highways.

  4. Numerical analysis of dynamic response of vehicle–bridge coupled system on long-span continuous girder bridge

    Directory of Open Access Journals (Sweden)

    Lipeng An

    2016-07-01

    Full Text Available To systematically study the vehicle–bridge coupled dynamic response and its change rule with different parameters, a vehicle model with seven degrees of freedom was built and the total potential energy of vehicle space vibration system was deduced. Considering the stimulation of road roughness, the dynamic response equation of vehicle–bridge coupled system was established in accordance with the elastic system principle of total potential energy with stationary value and the “set-in-right-position” rule. On the basis of the self-compiled Fortran program and bridge engineering, the dynamic response of long-span continuous girder bridge under vehicle load was studied. This study also included the calculation of vehicle impact coefficient, evaluation of vibration comfort, and analysis of dynamic response parameters. Results show the impact coefficient changes with lane number and is larger than the value calculated by the “general code for design of highway bridges and culverts (China”. The Dieckmann index of bridge vibration is also related to lane number, and the vibration comfort evaluation is good in normal conditions. The relevant conclusions from parametric analyses have practical significance to dynamic design and daily operation of long-span continuous girder bridges in expressways. Safety and comfort are expected to improve significantly with further control of the vibration of vehicle–bridge system.

  5. PARAMETRIC STUDY OF SKEW ANGLE ON BOX GIRDER BRIDGE DECK

    OpenAIRE

    Shrikant D. Bobade *, Dr. Valsson Varghese

    2016-01-01

    Box girder bridge deck, is the most common type of bridges in world and India, it consists of several Slab or girders. The span in the direction of the roadway and connected across their tops and bottoms by a thin continuous structural stab, the longitudinal box girders can be made of steel or concrete. The Simple supported single span concrete bridge deck is presented in present study. Skewed bridges are suitable in highway design when the geometry of straight bridges is not possible. The sk...

  6. Shear evaluation of tapered bridge girder panels with steel corrugated webs near the supports of continuous bridges

    OpenAIRE

    Zevallos, E.; Hassanein, M.F.; Real Saladrigas, Esther; Mirambell Arrizabalaga, Enrique

    2016-01-01

    Because of public construction budgets were cut over the last few years, new bridge girders with corrugated webs to reduce the construction costs have become more widely studied and used. In spite that tapered bridge girders with corrugated webs (BGCWs) are used in modern bridges, their shear strength and behaviour rarely exists in literature. Based on available literature, the web of the linearly tapered BGCWs may be divided into three typologies with different structural response to shear f...

  7. Dynamic Responses of Continuous Girder Bridges with Uniform Cross-Section under Moving Vehicular Loads

    OpenAIRE

    Gao, Qingfei; Wang, Zonglin; Jia, Hongyu; Liu, Chenguang; Li, Jun; Guo, Binqiang; Zhong, Junfei

    2015-01-01

    To address the drawback of traditional method of investigating dynamic responses of the continuous girder bridge with uniform cross-section under moving vehicular loads, the orthogonal experimental design method is proposed in this paper. Firstly, some empirical formulas of natural frequencies are obtained by theoretical derivation and numerical simulation. The effects of different parameters on dynamic responses of the vehicle-bridge coupled vibration system are discussed using our own progr...

  8. Research on structural dynamic characteristics of continuous steel box girder-bridge with lager ratio of wide-span

    Directory of Open Access Journals (Sweden)

    Yin Haijun

    2018-01-01

    Full Text Available Structure natural frequency and mode of vibration can not only reflect the structure modal parameters of dynamic properties, but also incarnate the dynamic evaluation characteristics of bridge structure. This paper applies ANSYS to establish the finite element model based on a continuous steel box girder bridge in order to obtain the corresponding modal analysis parameters. Through the environmental stimulation test, The results show that height of the steel box girder and the setting of diaphragm plate is reasonable, transverse space of piers not merely provide enough support but also ensure lateral stability of the bridge, as well as offering aside the maximum lateral clearance of the existing road. Meanwhile, the calculation results have important engineering practical values. which can provide basic data for the design, construction and maintenance of similar Bridges.

  9. Development of bridge girder movement criteria for accelerated bridge construction.

    Science.gov (United States)

    2014-06-01

    End diaphragms connect multiple girders to form a bridge superstructure system for effective resistance to earthquake loads. Concrete : girder bridges that include end diaphragms consistently proved to perform well during previous earthquake events. ...

  10. Continuous prestressed concrete girder bridges, volume 2 : analysis, testing, and recommendations.

    Science.gov (United States)

    2016-12-01

    The Texas Department of Transportation designs typical highway bridge structures as simple span systems using : standard precast, pretensioned girders. Spans are limited to about 150 ft due to weight and length restrictions on : transporting the prec...

  11. Bridge maintenance to enhance corrosion resistance and performance of steel girder bridges

    Science.gov (United States)

    Moran Yanez, Luis M.

    The integrity and efficiency of any national highway system relies on the condition of the various components. Bridges are fundamental elements of a highway system, representing an important investment and a strategic link that facilitates the transport of persons and goods. The cost to rehabilitate or replace a highway bridge represents an important expenditure to the owner, who needs to evaluate the correct time to assume that cost. Among the several factors that affect the condition of steel highway bridges, corrosion is identified as the main problem. In the USA corrosion is the primary cause of structurally deficient steel bridges. The benefit of regular high-pressure superstructure washing and spot painting were evaluated as effective maintenance activities to reduce the corrosion process. The effectiveness of steel girder washing was assessed by developing models of corrosion deterioration of composite steel girders and analyzing steel coupons at the laboratory under atmospheric corrosion for two alternatives: when high-pressure washing was performed and when washing was not considered. The effectiveness of spot painting was assessed by analyzing the corrosion on steel coupons, with small damages, unprotected and protected by spot painting. A parametric analysis of corroded steel girder bridges was considered. The emphasis was focused on the parametric analyses of corroded steel girder bridges under two alternatives: (a) when steel bridge girder washing is performed according to a particular frequency, and (b) when no bridge washing is performed to the girders. The reduction of structural capacity was observed for both alternatives along the structure service life, estimated at 100 years. An economic analysis, using the Life-Cycle Cost Analysis method, demonstrated that it is more cost-effective to perform steel girder washing as a scheduled maintenance activity in contrast to the no washing alternative.

  12. Comparative Research of Extra-large-span Cable-stayed Bridge with Steel Truss Girder and Steel Box Girder

    Directory of Open Access Journals (Sweden)

    Tan Manjiang

    2015-01-01

    Full Text Available To research structural performance of extra-large-span cable-stayed bridge under different section forms, with the engineering background of a 800m main-span cable-stayed bridge with steel truss girder, the cable-stayed bridge with steel box girder is designed according to the current bridge regulations when two bridges are designed in an ultimate state of the carrying capacity, so the maximum stress and minimum stress of the stress envelope diagram are substantially the same. A comprehensive comparison is given to two types of bridge on the aspect of static force, natural vibration frequency, stability, economic performance and so on. Analysis results provide future reference for the large-span cable-stayed bridge to select between the steel truss girder and the steel box girder.

  13. Continuous prestressed concrete girder bridges volume 1 : literature review and preliminary designs.

    Science.gov (United States)

    2012-06-01

    The Texas Department of Transportation (TxDOT) is currently designing typical highway bridge structures as simply supported using standard precast, pretensioned girders. TxDOT is interested in developing additional economical design alternatives for ...

  14. Suspension Bridge Flutter for Girder with Separate Control Flaps

    DEFF Research Database (Denmark)

    Huynh, T.; Thoft-Christensen, Palle

    Active vibration control of long span suspension bridge flutter using separated control flaps (SFSC) has shown to increase effectively the critical wind speed of bridges. In this paper, an SFSC calculation based on modal equations of the vertical and torsional motions of the bridge girder including...... the flaps is presented. The length of the flaps attached to the girder, the flap configuration and the flap rotational angles are parameters used to increase the critical wind speed of the bridge. To illustrate the theory a numerical example is shown for a suspension bridge of 1000m+2500m+1000m span based...... on the Great Belt Bridge streamlined girder....

  15. Shear capacity of in service prestressed concrete bridge girders.

    Science.gov (United States)

    2010-05-17

    The design of prestressed concrete bridge girders has changed significantly over the past several : decades. Specifically, the design procedure to calculate the shear capacity of bridge girders that : was used forty years ago is very different than t...

  16. Condition Assessment of PCI Bridge Girder a Result of The Reduction Prestressing Force

    Directory of Open Access Journals (Sweden)

    Suangga Made

    2014-03-01

    Full Text Available PCI bridge girders is known and widely used for many construction e.g.: bridge, wharf, flyover, and other application. PC Bridge girders have two types: Pre - tensioned girders and post - tensioned girders. In pre tensioned girders, prestressing in carried out first then after that the fresh concrete poured. The prestressing process in only carried off after the concrete has sufficient strength. In this study, analysis was conducted for PCI bridge girder with span is 40 meters. Based on the data geometry bridge dimension girder, material girder, and material strands cable, it will be analyzed to calculate the natural frequencies and moment capacity using finite element program (Midas/Civil program. So it can be estimated how much the percentage reduction prestress force on the bridge until PCI bridge structure collapses. From the calculation, it found that the pattern comparison between reduction prestressing force and natural frequency are linear. These results are also similar for natural frequency versus moment capacity.PCI bridge will collapse when the reduction prestreesing force of 45 % to 50 % from the total loss of prestressing.

  17. The effect of span length and girder type on bridge costs

    Directory of Open Access Journals (Sweden)

    Batikha Mustafa

    2017-01-01

    Full Text Available Bridges have an important role in impacting the civilization, growth and economy of cities from ancient time until these days due to their function in reducing transportation cost and time. Therefore, development of bridges has been a knowledge domain in civil engineering studies in terms of their types and construction materials to confirm a reliable, safe, economic design and construction. Girder-bridge of concrete deck and I-beam girder has been used widely for short and medium span bridges because of ease and low-cost of fabrication. However, many theoretical and practical investigations are still undertaken regarding the type of beam girder; i.e steel composite or prestressed concrete. This paper evaluates the effect of bridge span and the type of girder on the capital cost and life cycle costs of bridges. Three types of girders were investigated in this research: steel composite, pre-tensioned pre-stressed concrete and post-tensioned pre-stressed concrete. The structural design was analyzed for 5 span lengths: 20, 25, 30, 35 and 40m. Then, the capital construction cost was accounted for 15 bridges according to each span and construction materials. Moreover, the maintenance required for 50 years of bridge life was evaluated and built up as whole life costs for each bridge. As a result of this study, the influence of both span length and type of girder on initial construction cost and maintenance whole life costs were assessed to support the decision makers and designers in the selection process for the optimum solution of girder bridges.

  18. Study on the Old Girders in the Widening Hollow Slab Girder Bridge

    Science.gov (United States)

    Wang, Ying; Zhang, Li Fang; Ma, Hai Yan

    2018-06-01

    Taking the bridge widening project of Shanghai-Hangzhou-Ningbo expressway widening construction project (China) as the background in this paper, the variation law of the internal force of the old bridge in the widening hollow slab girder bridge under vehicle load is studied, which is under the condition of different span lengths and different widening widths. Three different span lengths of the pre-tensioned prestressed hollow slab girder bridges are selected, the spatial finite element models of both the old bridge and the whole structure of widening bridge are established and calculated respectively by Midas/Civil software. The influences of widening and load increasing on the old bridges under the vehicle load are compared and analyzed. In addition, the authors also analyze the influences of different widening widths on the force state of old bridges under the condition of widening the same number of lane. Moreover , the effects on the old bridges that are caused by the uneven foundation settlement of widening bridge structure are also studied in this paper. This paper can provide some references for widening design of hollow slab bridges.

  19. Design aids of NU I-girders bridges.

    Science.gov (United States)

    2010-05-01

    Precast prestressed concrete I-Girder bridges have become the most dominant bridge system in the United States. In the early design : stages, preliminary design becomes a vital first step in designing an economical bridge. Within the state of Nebrask...

  20. Design of bridge crane girder strain acquisition system based on virtual instrument

    Directory of Open Access Journals (Sweden)

    Wenxue LIU

    Full Text Available Girder is an important part of the bridge crane, which is also the main force element. In order to prevent accidents, it is necessary to collect the bridge crane girder stress data to analyse the fatigue life. This paper constructs a bridge crane girder strain acquisition system. The hardware system consists of sensors, connectors, data acquisition cards, wireless data transmission groups, POE power and host computer. The software system consists of NI MAX to interface with the computer's NI hardware and software resources,and LabVIEW programming to display and storage the girder strain data. Through this system, positions and working days strain data acquisition for the 50/10 t bridge crane girder gets the key positions strain data. The results show that the girder strain data acquisition system runs stably, channel signals of acquisition task transmit accurately, and the terminal data stores competely, meeting the detection requirements, which provides an important data support for the subsequent fatigue analysis and accurate remaining service life prediction of the crane girder.

  1. Effect of longitudinal stiffening on bridge girder webs at incremental launching stage

    Directory of Open Access Journals (Sweden)

    Carlos Graciano

    2015-01-01

    Full Text Available Patch loading is a predominant load case at incremental bridge launching. Bridge girder webs are frequently provided with longitudinal stiffeners to increase in-service shear and bending strength, and its effect has been included in design codes. However, no straightforward rules are given to account for the influence of such stiffeners on improving the patch loading resistance. This paper presents a review of some available formulae found in the literature to estimate the girder ultimate strength including the provisions of the European, American and Colombian design codes. Additionally, a nonlinear finite element analysis is conducted on three case studies related to actual launched bridges. The case studies are also used to study the influence of the longitudinal stiffener and girder depth on the girder capacity. Different load-displacement responses are observed depending on the girder depth. Finally, the finite element analysis shows to what extent the longitudinal stiffeners can increase the patch loading capacity of bridge girder webs during launching.

  2. Statistical determination of significant curved I-girder bridge seismic response parameters

    Science.gov (United States)

    Seo, Junwon

    2013-06-01

    Curved steel bridges are commonly used at interchanges in transportation networks and more of these structures continue to be designed and built in the United States. Though the use of these bridges continues to increase in locations that experience high seismicity, the effects of curvature and other parameters on their seismic behaviors have been neglected in current risk assessment tools. These tools can evaluate the seismic vulnerability of a transportation network using fragility curves. One critical component of fragility curve development for curved steel bridges is the completion of sensitivity analyses that help identify influential parameters related to their seismic response. In this study, an accessible inventory of existing curved steel girder bridges located primarily in the Mid-Atlantic United States (MAUS) was used to establish statistical characteristics used as inputs for a seismic sensitivity study. Critical seismic response quantities were captured using 3D nonlinear finite element models. Influential parameters from these quantities were identified using statistical tools that incorporate experimental Plackett-Burman Design (PBD), which included Pareto optimal plots and prediction profiler techniques. The findings revealed that the potential variation in the influential parameters included number of spans, radius of curvature, maximum span length, girder spacing, and cross-frame spacing. These parameters showed varying levels of influence on the critical bridge response.

  3. Design and construction of a cable-stayed composite girder bridge with precast RC-slabs; Purekyasuto shohan gosei keta shachokoyo no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Maeda, K. [Tokyo Metropolitan Univ. (Japan). Faculty of Technology; Shimura, T.; Tachibana, Y.; Echigo, S. [Kawada Industries Inc., Tokyo (Japan)

    1995-09-20

    A report on design and execution of cable-stayed composite girder bridge with precast RC-slabs constructed first in Japan though in small scale was described. This bridge adopted steel slabs relatively low in slab height for main slab and with two boxes slab section, and was designed at an aim of being more economic and shorter in its working term in comparison with steel girder slab type, on a base of the design in a region allowable with the existing design standards. This bridge is mainly in accordance with the regulation on continuous bridge in the prescription of road bridge, and is designed for normal RC-girder selecting between girder supports to direction normal to bridge axis as usual without using specially strong concrete to the girder. And, in order to fill with the regulation on allowable tensile stress on considering effects of creep and drying shrinkage, a method adding prestress to the slabs was adopted. Furthermore, a loop-like overlap joint for cable joint for the precast girders, expansion concrete for joint portion to compose the girder with the steel slab and so forth were adopted. 12 refs., 22 figs., 5 tabs.

  4. Repair of Impact-Damaged Prestressed Bridge Girders Using Strand Splices and Fabric Reinforced Cementitious Matrix

    OpenAIRE

    Jones, Mark Stevens

    2017-01-01

    This thesis investigates the repair of impact-damaged prestressed concrete bridge girders with strand splices and fabric-reinforced cementitious matrix systems, specifically for repair of structural damage to the underside of an overpass bridge girder due to an overheight vehicle collision. Collision damage to bridges can range from minor to catastrophic, potentially requiring repair or replacement of a bridge girder. This thesis investigates the performance of two different types of repair...

  5. Reliability Assessment for PSC Box-Girder Bridges Based on SHM Strain Measurements

    Directory of Open Access Journals (Sweden)

    Chuang Chen

    2017-01-01

    Full Text Available A reliability assessment method for prestressed concrete (PSC continuous box-girder bridges based on structural health monitoring (SHM strain measurements was proposed. First, due to the fact that measured strain was compositive and the variation periods of its components were different, a series of limit state equations under normal use limit state were given. Then, a linear fitting method was used to determine the relationship between the ambient temperature and the measured strain, which was aimed at extracting the vehicle load effect and the temperature load effect from the measured strain. Finally, according to the equivalent normalization method, the load effects unsatisfying the normal distribution by probability density function fitting were transformed, and the daily failure probabilities of monitored positions were calculated for evaluating the safety state of the girder. The results show that (1 the top plate of the box girder is more sensitive than the bottom plate to the high temperature, (2 the daily and seasonal strain variations induced by uniform temperature reveal an inconsistent tendency to the seasonal variation for mid-span cross sections, and (3 the generalized extreme value distribution is recommended for temperature gradient stress and vehicle induced stress fitting for box-girder bridges.

  6. Simplified method for the transverse bending analysis of twin celled concrete box girder bridges

    Science.gov (United States)

    Chithra, J.; Nagarajan, Praveen; S, Sajith A.

    2018-03-01

    Box girder bridges are one of the best options for bridges with span more than 25 m. For the study of these bridges, three-dimensional finite element analysis is the best suited method. However, performing three-dimensional analysis for routine design is difficult as well as time consuming. Also, software used for the three-dimensional analysis are very expensive. Hence designers resort to simplified analysis for predicting longitudinal and transverse bending moments. Among the many analytical methods used to find the transverse bending moments, SFA is the simplest and widely used in design offices. Results from simplified frame analysis can be used for the preliminary analysis of the concrete box girder bridges.From the review of literatures, it is found that majority of the work done using SFA is restricted to the analysis of single cell box girder bridges. Not much work has been done on the analysis multi-cell concrete box girder bridges. In this present study, a double cell concrete box girder bridge is chosen. The bridge is modelled using three- dimensional finite element software and the results are then compared with the simplified frame analysis. The study mainly focuses on establishing correction factors for transverse bending moment values obtained from SFA.

  7. Effects of Adhesive Connection on Composite Action between FRP Bridge Deck and Steel Girder

    NARCIS (Netherlands)

    Jiang, X.; Luo, Chengwei; Qiang, X.; Kolstein, M.H.; Bijlaard, F.S.K.

    2017-01-01

    The FRP-steel girder composite bridge system is increasingly used in new constructions of bridges as well as rehabilitation of old bridges. However, the understanding of composite action between FRP decks and steel girders is limited and needs to be systematically investigated. In this paper,

  8. review of elastic analys ew of elastic analysis of box girder bridges

    African Journals Online (AJOL)

    eobe

    Nigerian Journal of Technology,. Vol. 34, No. 1, January 2015 87 bridges under the attack of pitting corrosion. Savkovic et al. [130] proposed an optimum solution to optimization of the box section of the main girder of the bridge crane. Reduction of the girder mass was set as the objective function. Optimum dimensions of the.

  9. Self-Consolidating Concrete for Prestressed Bridge Girders

    Science.gov (United States)

    2017-07-01

    This document reports the findings of a research project designed to better understand material and structural performance of prestressed bridge girders made with Self-Consolidating Concrete (SCC) from Wisconsin. SCC has high potential to be used for...

  10. Extension of POA based on Fiber Element to Girder Bridge

    International Nuclear Information System (INIS)

    Li Zhenxin; Qiang Shizhong

    2010-01-01

    Because of its main advantage of simplicity, practicality, lower computational cost and relative good results Pushover analysis (POA) has become an effective analytical tool during the last decade for the seismic assessment of buildings. But such work on bridges has been very limited. Hence, the aim of this study is to adapt POA for nonlinear seismic analysis of girder bridges, and investigate its applicability in the case of an existing river-spanning approach bridge. To three different types bridge models the nonlinear POA, which adopts fiber model nonlinear beam-column element based on flexibility approach, with return period about 2500 years is carried out. It can be concluded that POA is applicable for bridges, with some shortcomings associated with the method in general, even when it is applied for buildings. Finally the applicable selection for monitoring point and lateral load pattern is suggested according to dynamic characteristic of girder bridges.

  11. A new solution of measuring thermal response of prestressed concrete bridge girders for structural health monitoring

    International Nuclear Information System (INIS)

    Jiao, Pengcheng; Borchani, Wassim; Hasni, Hassene; Lajnef, Nizar

    2017-01-01

    This study develops a novel buckling-based mechanism to measure the thermal response of prestressed concrete bridge girders under continuous temperature changes for structural health monitoring. The measuring device consists of a bilaterally constrained beam and a piezoelectric polyvinylidene fluoride transducer that is attached to the beam. Under thermally induced displacement, the slender beam is buckled. The post-buckling events are deployed to convert the low-rate and low-frequency excitations into localized high-rate motions and, therefore, the attached piezoelectric transducer is triggered to generate electrical signals. Attaching the measuring device to concrete bridge girders, the electrical signals are used to detect the thermal response of concrete bridges. Finite element simulations are conducted to obtain the displacement of prestressed concrete girders under thermal loads. Using the thermal-induced displacement as input, experiments are carried out on a 3D printed measuring device to investigate the buckling response and corresponding electrical signals. A theoretical model is developed based on the nonlinear Euler–Bernoulli beam theory and large deformation assumptions to predict the buckling mode transitions of the beam. Based on the presented theoretical model, the geometry properties of the measuring device can be designed such that its buckling response is effectively controlled. Consequently, the thermally induced displacement can be designed as limit states to detect excessive thermal loads on concrete bridge girders. The proposed solution sufficiently measures the thermal response of concrete bridges. (paper)

  12. A new solution of measuring thermal response of prestressed concrete bridge girders for structural health monitoring

    Science.gov (United States)

    Jiao, Pengcheng; Borchani, Wassim; Hasni, Hassene; Lajnef, Nizar

    2017-08-01

    This study develops a novel buckling-based mechanism to measure the thermal response of prestressed concrete bridge girders under continuous temperature changes for structural health monitoring. The measuring device consists of a bilaterally constrained beam and a piezoelectric polyvinylidene fluoride transducer that is attached to the beam. Under thermally induced displacement, the slender beam is buckled. The post-buckling events are deployed to convert the low-rate and low-frequency excitations into localized high-rate motions and, therefore, the attached piezoelectric transducer is triggered to generate electrical signals. Attaching the measuring device to concrete bridge girders, the electrical signals are used to detect the thermal response of concrete bridges. Finite element simulations are conducted to obtain the displacement of prestressed concrete girders under thermal loads. Using the thermal-induced displacement as input, experiments are carried out on a 3D printed measuring device to investigate the buckling response and corresponding electrical signals. A theoretical model is developed based on the nonlinear Euler-Bernoulli beam theory and large deformation assumptions to predict the buckling mode transitions of the beam. Based on the presented theoretical model, the geometry properties of the measuring device can be designed such that its buckling response is effectively controlled. Consequently, the thermally induced displacement can be designed as limit states to detect excessive thermal loads on concrete bridge girders. The proposed solution sufficiently measures the thermal response of concrete bridges.

  13. Analytical Calculation And FEM Analysis Main Girder Double Girder Bridge Crane

    Directory of Open Access Journals (Sweden)

    Muamer Delić

    2017-02-01

    Full Text Available The cranes are now not replaceable mode of transport of materials and finished products both in production halls and in the open space. This paper made the whole analytical calculation of double girder bridge cranes to be used in laboratories exclusively for testing, determined by the maximum bending stress and deflection of the main girder. After calculating the dimensions, we created a model cranes in software CATIA V5. The same model was subjected to FEM analysis of the same name software. At the end of the paper comparison has been done. The objective of the calculation and analysis of the model was to develop a model crane and to serve for the next tests. Dimensions of the crane are given according to the laboratory where it will be located.

  14. Dynamic Responses of Continuous Girder Bridges with Uniform Cross-Section under Moving Vehicular Loads

    Directory of Open Access Journals (Sweden)

    Qingfei Gao

    2015-01-01

    Full Text Available To address the drawback of traditional method of investigating dynamic responses of the continuous girder bridge with uniform cross-section under moving vehicular loads, the orthogonal experimental design method is proposed in this paper. Firstly, some empirical formulas of natural frequencies are obtained by theoretical derivation and numerical simulation. The effects of different parameters on dynamic responses of the vehicle-bridge coupled vibration system are discussed using our own program. Finally, the orthogonal experimental design method is proposed for the dynamic responses analysis. The results show that the effects of factors on dynamic responses are dependent on both the selected position and the type of the responses. In addition, the interaction effects between different factors cannot be ignored. To efficiently reduce experimental runs, the conventional orthogonal design is divided into two phases. It has been proved that the proposed method of the orthogonal experimental design greatly reduces calculation cost, and it is efficient and rational enough to study multifactor problems. Furthermore, it provides a good way to obtain more rational empirical formulas of the DLA and other dynamic responses, which may be adopted in the codes of design and evaluation.

  15. Numerical Analysis on Variation of Dynamic Response of Girder Bridges with Torsional Reinforcement Panels

    Directory of Open Access Journals (Sweden)

    Kang Jae-Yoon

    2015-01-01

    Full Text Available The dynamic flexural behaviour of the railway bridge is influenced by its torsional behaviour. Especially, in the case of girder railway bridges, the dynamic response tends to amplify when the natural frequency in flexure (1st vibration mode is close to that in torsion (2nd vibration mode. In order to prevent such situation, it is necessary to adopt a flexural-to-torsional natural frequency ratio larger than 120%. This study proposes a solution shifting the natural frequency in torsion to high frequency range and restraining torsion by installing concrete panels on the bottom flange of the girder so as to prevent the superposition of the responses in the girder bridge. The applicability of this solution is examined by finite element analysis of the shift of the torsional natural frequency and change in the dynamic response according to the installation of the concrete panels. The analytical results for a 30 m-span girder railway bridge indicate that installing the concrete panels increases the natural frequency in torsion by restraining the torsional behaviour and reduces also the overall dynamic response. It is seen that the installation of 100 mm-thick concrete panels along a section of 4 m at both extremities of the girder can reduce the dynamic response by more than 30%.

  16. Comparison Between PCI and Box Girder in BridgesPrestressed Concrete Design

    Science.gov (United States)

    Rahmawati, Cut; Zainuddin, Z.; Is, Syafridal; Rahim, Robbi

    2018-04-01

    This research is done by comparing PCI and Box Girder types of prestressed concrete design. The method used is load balance. Previous studies have just discussed the differences in terms of effectiveness and economics. In this study, the researchers want to know the design process by comparing the working forces, the resulting moment, and the losses of the prestressed. As the case in this study, the researchers used the bridge with the span of 31 meters. The tendon pulling system was conducted with post-tensioning system The analysis result showed that prestressed of the Girder box type sustained the greatest moment due to the combination of its own weight, additional dead load, lane load, and wind load of 44,029 kNm, while the biggest moment of PCI Girder was 7,556.75 KNm The Girder beam box experiences greater moment and shear force than PCI Girder. This is the effect of the weight of its own Girderboxwaslarger than PCI Girder. The losses ofprestressed style of Girderboxand PCI Girder type were 24.85% and 26.32%, respectively.Moreover, it showed that the type of Girder box is cheaper, easier, and more efficient than PCI Girder.

  17. Shear Behavior of Corrugated Steel Webs in H Shape Bridge Girders

    Directory of Open Access Journals (Sweden)

    Qi Cao

    2015-01-01

    Full Text Available In bridge engineering, girders with corrugated steel webs have shown good mechanical properties. With the promotion of composite bridge with corrugated steel webs, in particular steel-concrete composite girder bridge with corrugated steel webs, it is necessary to study the shear performance and buckling of the corrugated webs. In this research, by conducting experiment incorporated with finite element analysis, the stability of H shape beam welded with corrugated webs was tested and three failure modes were observed. Structural data including load-deflection, load-strain, and shear capacity of tested beam specimens were collected and compared with FEM analytical results by ANSYS software. The effects of web thickness, corrugation, and stiffening on shear capacity of corrugated webs were further discussed.

  18. Self-Consolidating Concrete for Prestressed Bridge Girders : Research Brief

    Science.gov (United States)

    2017-08-01

    Self-consolidating concrete (SCC) is commonly used as an alternative to conventional concrete (CC) in precast, prestressed concrete (PSC) bridge girders. The high strength, highly workable mixture can flow through dense reinforcement to fill formwork...

  19. Flexural and Shear Behavior of FRP Strengthened AASHTO Type Concrete Bridge Girders

    Directory of Open Access Journals (Sweden)

    Nur Yazdani

    2016-01-01

    Full Text Available Fiber-reinforced polymers (FRP are being increasingly used for the repair and strengthening of deteriorated or unsafe concrete structures, including structurally deficient concrete highway bridges. The behavior of FRP strengthened concrete bridge girders, including failure modes, failure loads, and deflections, can be determined using an analytical finite element modeling approach, as outlined in this paper. The differences in flexural versus shear FRP strengthening and comparison with available design guidelines are also beneficial to design professionals. In this paper, a common AASHTO type prestressed concrete bridge girder with FRP wrapping was analyzed using the ANSYS FEM software and the ACI analytical approach. Both flexural and shear FRP applications, including vertical and inclined shear strengthening, were examined. Results showed that FRP wrapping can significantly benefit concrete bridge girders in terms of flexure/shear capacity increase, deflection reduction, and crack control. The FRP strength was underutilized in the section selected herein, which could be addressed through decrease of the amount of FRP and prestressing steel used, thereby increasing the section ductility. The ACI approach produced comparable results to the FEM and can be effectively and conveniently used in design.

  20. Evaluation of continuity detail for precast prestressed girders.

    Science.gov (United States)

    2011-08-01

    The construction of highway bridges using precast prestressed concrete (PSC) girders is considered one of the most : economical construction alternatives because of the advantages they offer (e.g. reducing formwork and rapid construction). : Construc...

  1. Evaluation of a highway bridge constructed using high strength lightweight concrete bridge girders.

    Science.gov (United States)

    2011-04-01

    The use of high performance concretes to provide longer bridge spans has been limited due to the capacity of existing infrastructure to handle the load of the girders during transportation. The use of High Strength Lightweight Concrete (HSLW) can pro...

  2. Shear in high strength concrete bridge girders : technical report.

    Science.gov (United States)

    2013-04-01

    Prestressed Concrete (PC) I-girders are used extensively as the primary superstructure components in Texas highway bridges. : A simple semi-empirical equation was developed at the University of Houston (UH) to predict the shear strength of PC I-girde...

  3. Effects of Adhesive Connection on Composite Action between FRP Bridge Deck and Steel Girder

    Directory of Open Access Journals (Sweden)

    Xu Jiang

    2017-01-01

    Full Text Available The FRP-steel girder composite bridge system is increasingly used in new constructions of bridges as well as rehabilitation of old bridges. However, the understanding of composite action between FRP decks and steel girders is limited and needs to be systematically investigated. In this paper, depending on the experimental investigations of FRP to steel girder system, the Finite Element (FE models on experiments were developed and analyzed. Comparison between experiments and FE results indicated that the FE models were much stiffer for in-plane shear stiffness of the FRP deck panel. To modify the FE models, rotational spring elements were added between webs and flanges of FRP decks, to simulate the semirigid connections. Numerical analyses were also conducted on four-point bending experiments of FRP-steel composite girders. Good agreement between experimental results and FE analysis was achieved by comparing the load-deflection curves at midspan and contribution of composite action from FRP decks. With the validated FE models, the parametric studies were conducted on adhesively bonded connection between FRP decks and steel girders, which indicated that the loading transfer capacity of adhesive connection was not simply dependent on the shear modulus or thickness of adhesive layer but dominated by the in-plane shear stiffness K.

  4. STRENGTHENING CONCRETE HOLLOW SECTION GIRDER BRIDGE USING POLYURETHANE-CEMENT MATERIAL (PART B

    Directory of Open Access Journals (Sweden)

    Haleem K. Hussain

    2018-01-01

    Full Text Available This paper presents experimental study to retrofitted reinforced concrete Hollow Section Bridge. The study was carried out on the White River Bridge structure (Bai xi da Qiao / China. The effect of retrofitting on stress and strain of beams at the critical section was studied. Evaluating the bridges girder after strengthening using new material called PolyurethaneCement material (PUC as an external material .This study present the strain and deflection before and after strengthening the bridge girders. The results has shown that the overall state of the bridge structural strengthening is in good condition. The enhancement was significant in stiffness of the bridge structure. Regarding to the results of static load test, the experimental values strain and deflection are less than theoretical values, indicating that the stiffness of the structure, overall deformation and integrity satisfy the designed and standard requirements and the working performance are in good condition, and flexure capacity has a certain surplus.

  5. Complex Method Mixed with PSO Applying to Optimization Design of Bridge Crane Girder

    Directory of Open Access Journals (Sweden)

    He Yan

    2017-01-01

    Full Text Available In engineer design, basic complex method has not enough global search ability for the nonlinear optimization problem, so it mixed with particle swarm optimization (PSO has been presented in the paper,that is the optimal particle evaluated from fitness function of particle swarm displacement complex vertex in order to realize optimal principle of the largest complex central distance.This method is applied to optimization design problems of box girder of bridge crane with constraint conditions.At first a mathematical model of the girder optimization has been set up,in which box girder cross section area of bridge crane is taken as the objective function, and its four sizes parameters as design variables, girder mechanics performance, manufacturing process, border sizes and so on requirements as constraint conditions. Then complex method mixed with PSO is used to solve optimization design problem of cane box girder from constrained optimization studying approach, and its optimal results have achieved the goal of lightweight design and reducing the crane manufacturing cost . The method is reliable, practical and efficient by the practical engineer calculation and comparative analysis with basic complex method.

  6. Repair of cracked prestressed concrete girders, I-565, Huntsville, Alabama.

    Science.gov (United States)

    2011-07-01

    Wide cracks were discovered in prestressed concrete bridge girders shortly after their construction in Huntsville, Alabama. Previous investigations of these continuous-for-live-load girders revealed that the cracking resulted from restrained thermal ...

  7. Evaluation of continuity detail for precast prestressed girders : tech summary.

    Science.gov (United States)

    2011-08-01

    Building multi-simple span bridges using precast prestressed concrete girders is an easy construction. However, the existence of : expansion joints often leads to a host of problems in their vicinity due to drainage leaks. Furthermore, debris accumul...

  8. Proposal and study of a long-span composite cable-stayed bridge with new hybrid girder; Atarashii gosei kozo shuketa wo mochiita chodai fukugo shachokyo no kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Yoshida, K.; Hishiki, Y.; Furuichi, K. [Kajima Corp., Tokyo (Japan)

    1999-09-30

    A hybrid or mixed structure (composite structures) are a matter of increasing concern which takes in each advantage of steel and concrete. A field of bridges is no exception, with the plan and construction carried out for the new type of composite bridge, such as a composite cable-stayed bridge and a composite extra dose bridge as a long span bridge, and a composite truss bridge and a corrugated steel plate web bridge as a medium-span bridge, with technological development becoming active in this field. In such a technological trend, a hybrid two-girder structure was devised, a structure consisting of a concrete filled steel pipe for a girder and a precast (PC) floor plate for a floor board, as the girder structure of a long-span cable-stayed bridge in the subject research; also, applicability was examined using, as an example, the composite cable-stayed bridge with hybrid girders employed for the span. This paper reports the result of the analysis of the entire system, the analysis made for the purpose of examining the characteristic and the feasibility of this hybrid girder. The analysis revealed the structural feasibility of the long-span composite cable-stayed bridge using two hybrid girders of concrete-filled steel pipes thus devised. (NEDO)

  9. Finite element model updating of multi-span steel-arch-steel-girder bridges based on ambient vibrations

    Science.gov (United States)

    Hou, Tsung-Chin; Gao, Wei-Yuan; Chang, Chia-Sheng; Zhu, Guan-Rong; Su, Yu-Min

    2017-04-01

    The three-span steel-arch-steel-girder Jiaxian Bridge was newly constructed in 2010 to replace the former one that has been destroyed by Typhoon Sinlaku (2008, Taiwan). It was designed and built to continue the domestic service requirement, as well as to improve the tourism business of the Kaohsiung city government, Taiwan. This study aimed at establishing the baseline model of Jiaxian Bridge for hazardous scenario simulation such as typhoons, floods and earthquakes. Necessities of these precaution works were attributed to the inherent vulnerability of the sites: near fault and river cross. The uncalibrated baseline bridge model was built with structural finite element in accordance with the blueprints. Ambient vibration measurements were performed repeatedly to acquire the elastic dynamic characteristics of the bridge structure. Two frequency domain system identification algorithms were employed to extract the measured operational modal parameters. Modal shapes, frequencies, and modal assurance criteria (MAC) were configured as the fitting targets so as to calibrate/update the structural parameters of the baseline model. It has been recognized that different types of structural parameters contribute distinguishably to the fitting targets, as this study has similarly explored. For steel-arch-steel-girder bridges in particular this case, joint rigidity of the steel components was found to be dominant while material properties and section geometries relatively minor. The updated model was capable of providing more rational elastic responses of the bridge superstructure under normal service conditions as well as hazardous scenarios, and can be used for manage the health conditions of the bridge structure.

  10. Experimental Investigation for Behavior of Spliced Continuous RC Girders Strengthened with CFRP Laminates

    Directory of Open Access Journals (Sweden)

    Ammar Yasir Ali

    2016-03-01

    Full Text Available In this paper, the behavior of spliced continuous reinforced concrete girders was experimentally investigated. The main objective was to examine the contribution of the carbon fiber reinforced polymer (CFRP laminates in strengthening the spliced continuous reinforced concrete girders. Eight models of continuous reinforced concrete girder were constructed and tested. The test variables were strengthening the splice joints by different schemes of CFRP laminates, presence of horizontal stirrups through the interfaces of the joints and using binder material at the interfaces of the joints. The results showed that strengthening the continuous spliced girders with 45° inclined CFRP laminates led to an increase in the ultimate load in a range of (47 to 74%. Besides, strengthening the continuous spliced girder with horizontal CFRP laminates bonded at its lateral faces could increase the ultimate load by 70%. Additionally, the ultimate load of the continuous spliced girder was increased by (30% due to presence of the horizontal steel stirrups through the interfaces of the joints

  11. Load Distribution Factors for Composite Multicell Box Girder Bridges

    Science.gov (United States)

    Tiwari, Sanjay; Bhargava, Pradeep

    2017-12-01

    Cellular steel section composite with a concrete deck is one of the most suitable superstructures in resisting torsional and warping effects induced by highway loading. This type of structure has inherently created new design problems for engineers in estimating its load distribution when subjected to moving vehicles. Indian Codes of Practice does not provide any specific guidelines for the design of straight composite concrete deck-steel multi-cell bridges. To meet the practical requirements arising during the design process, a simple design method is needed for straight composite multi-cell bridges in the form of load distribution factors for moment and shear. This work presents load distribution characteristics of straight composite multi-cell box girder bridges under IRC trains of loads.

  12. Strength and durability of near-surface mounted CFRP bars for shear strengthening reinforced concrete bridge girders.

    Science.gov (United States)

    2012-03-01

    During the interstate expansion of the 1950s, many conventionally reinforced concrete deck girder bridges were built throughout the country. These aging bridges commonly exhibit diagonal cracking and rate inadequately for shear, thus they are candida...

  13. Strength and durability of near-surface mounted CFRP bars for shear strengthening reinforced concrete bridge girders : appendices.

    Science.gov (United States)

    2012-01-01

    During the interstate expansion of the 1950s, many conventionally reinforced concrete deck girder bridges were built throughout the country. These aging bridges commonly exhibit diagonal cracking and rate inadequately for shear, thus they are candida...

  14. Development of Embedded EM Sensors for Estimating Tensile Forces of PSC Girder Bridges

    Science.gov (United States)

    Kim, Ju-Won; Lee, Chaggil; Park, Seunghee

    2017-01-01

    The tensile force of pre-stressed concrete (PSC) girders is the most important factor for managing the stability of PSC bridges. The tensile force is induced using pre-stressing (PS) tendons of a PSC girder. Because the PS tendons are located inside of the PSC girder, the tensile force cannot be measured after construction using conventional NDT (non-destructive testing) methods. To monitor the induced tensile force of a PSC girder, an embedded EM (elasto-magnetic) sensor was proposed in this study. The PS tendons are made of carbon steel, a ferromagnetic material. The magnetic properties of the ferromagnetic specimen are changed according to the induced magnetic field, temperature, and induced stress. Thus, the tensile force of PS tendons can be estimated by measuring their magnetic properties. The EM sensor can measure the magnetic properties of ferromagnetic materials in the form of a B (magnetic density)-H (magnetic force) loop. To measure the B-H loop of a PS tendon in a PSC girder, the EM sensor should be embedded into the PSC girder. The proposed embedded EM sensor can be embedded into a PSC girder as a sheath joint by designing screw threads to connect with the sheath. To confirm the proposed embedded EM sensors, the experimental study was performed using a down-scaled PSC girder model. Two specimens were constructed with embedded EM sensors, and three sensors were installed in each specimen. The embedded EM sensor could measure the B-H loop of PS tendons even if it was located inside concrete, and the area of the B-H loop was proportionally decreased according to the increase in tensile force. According to the results, the proposed method can be used to estimate the tensile force of unrevealed PS tendons. PMID:28867790

  15. Composite Action in Prestressed NU I-Girder Bridge Deck Systems Constructed with Bond Breakers to Facilitate Deck Removal : Technical Summary

    Science.gov (United States)

    2017-11-01

    Results are reported from tests of small-scale push-off and large-scale composite NU I-girder specimens conducted to establish an interface connection detail that (1) Facilitates in-situ removal of the bridge deck without damaging prestressed girders...

  16. Strength and durability of near-surface mounted CFRP bars for shear strengthening reinforced concrete bridge girders : final report.

    Science.gov (United States)

    2012-03-01

    During the interstate expansion of the 1950s, many conventionally reinforced concrete deck girder bridges were built throughout the country. These aging bridges commonly exhibit diagonal cracking and rate inadequately for shear, thus they are candida...

  17. Structural Health Monitoring and Time-Dependent Effects Analysis of Self-Anchored Suspension Bridge with Extra-Wide Concrete Girder

    Directory of Open Access Journals (Sweden)

    Guangpan Zhou

    2018-01-01

    Full Text Available The present work is aimed at studying the structural health status of Hunan Road Bridge, which is currently the widest concrete self-anchored suspension bridge in China. The monitoring data included the structural deformations, internal forces, and vibration characteristics from April 2015 to April 2016 were analyzed to evaluate the structural changes and safety. The influences brought by the ambient temperature changes and the dual effects composed of concrete shrinkage & creep (S&C and seasonal temperature changes were analyzed based on the measured data. The long-time effects of concrete S&C were predicted using the CEB-FIP 90 model and the age-adjusted effective modulus method based on the ANSYS beam finite element model. The measured data showed that the transverse displacements of towers were more significant than the longitudinal ones. The spatial effect of the extra-wide girder is significant, which performs as the longitudinal stresses change unevenly along the transverse direction. The seasonal ambient warming caused overall increases in girder compressive stresses, and the cooling resulted in decreases along with significant temperature gradient effects. The prediction results show that the cable anchoring positions at girder ends and tower tops will move towards the mid-span affected by concrete S&C. In terms of the middle region of mid-span girder, significant increases in longitudinal stresses of top plate and decreases in the ones of bottom plate will be caused by the significant deflection. Comprehensively, the increases in the girder compressive stresses of side-span bottom plate and mid-span top plate are worthy of attention when confronted with extreme high temperature during the bridge service life cycle.

  18. Strength and durability of near-surface mounted CFRP bars for shear strengthening reinforced concrete bridge girders : final report appendices.

    Science.gov (United States)

    2012-03-01

    During the interstate expansion of the 1950s, many conventionally reinforced concrete deck girder bridges were built throughout the country. These aging bridges commonly exhibit diagonal cracking and rate inadequately for shear, thus they are candida...

  19. Evaluation on Impact Interaction between Abutment and Steel Girder Subjected to Nonuniform Seismic Excitation

    Directory of Open Access Journals (Sweden)

    Yue Zheng

    2015-01-01

    Full Text Available This paper aims to evaluate the impact interaction between the abutment and the girder subjected to nonuniform seismic excitation. An impact model based on tests is presented by taking material properties of the backfill of the abutment into consideration. The conditional simulation is performed to investigate the spatial variation of earthquake ground motions. A two-span continuous steel box girder bridge is taken as the example to analyze and assess the pounding interaction between the abutment and the girder. The detailed nonlinear finite element (FE model is established and the steel girder and the reinforced concrete piers are modeled by nonlinear fiber elements. The pounding element of the abutment is simulated by using a trilinear compression gap element. The elastic-perfectly plastic element is used to model the nonlinear rubber bearings. The comparisons of the pounding forces, the shear forces of the nonlinear bearings, the moments of reinforced concrete piers, and the axial pounding stresses of the steel girder are studied. The made observations indicate that the nonuniform excitation for multisupport bridge is imperative in the analysis and evaluation of the pounding effects of the bridges.

  20. Life-Cycle Monitoring of Long-Span PSC Box Girder Bridges through Distributed Sensor Network: Strategies, Methods, and Applications

    OpenAIRE

    Chen, Zheheng; Guo, Tong; Yan, Shengyou

    2015-01-01

    Structural health monitoring (SHM) has attracted much attention in recent years, which enables early warnings of structural failure, condition assessments, and rational maintenance/repair strategies. In the context of bridges, many long-span steel bridges in China have been installed with the SHM systems; however, the applications of the SHM in prestressed concrete (PSC) bridges are still rather limited. On the other hand, the PSC box girder bridges are extensively used in highway and railway...

  1. Life-Cycle Monitoring of Long-Span PSC Box Girder Bridges through Distributed Sensor Network: Strategies, Methods, and Applications

    Directory of Open Access Journals (Sweden)

    Zheheng Chen

    2015-01-01

    Full Text Available Structural health monitoring (SHM has attracted much attention in recent years, which enables early warnings of structural failure, condition assessments, and rational maintenance/repair strategies. In the context of bridges, many long-span steel bridges in China have been installed with the SHM systems; however, the applications of the SHM in prestressed concrete (PSC bridges are still rather limited. On the other hand, the PSC box girder bridges are extensively used in highway and railway systems and premature damage of these bridges is often reported, resulting in considerable maintenance and/or replacement costs. First, this paper presents a state-of-art review on the SHM of long-span PSC bridges. Monitoring strategies, methods, and previous applications for these bridges are summarized and discussed. In order to well capture the behavior of the bridge during its whole life and to maximize the use of sensors, a life-cycle monitoring strategy is proposed, in which the sensor layout is determined according to requirements for construction monitoring, completion test, and in-service monitoring. A case study is made on a three-span PSC box girder bridge in China. The system configuration, sensor layout, and data communications, and so forth, are presented. The up-to-date monitored structural responses are analyzed and compared with the design values.

  2. Finite element model updating of a prestressed concrete box girder bridge using subproblem approximation

    Science.gov (United States)

    Chen, G. W.; Omenzetter, P.

    2016-04-01

    This paper presents the implementation of an updating procedure for the finite element model (FEM) of a prestressed concrete continuous box-girder highway off-ramp bridge. Ambient vibration testing was conducted to excite the bridge, assisted by linear chirp sweepings induced by two small electrodynamic shakes deployed to enhance the excitation levels, since the bridge was closed to traffic. The data-driven stochastic subspace identification method was executed to recover the modal properties from measurement data. An initial FEM was developed and correlation between the experimental modal results and their analytical counterparts was studied. Modelling of the pier and abutment bearings was carefully adjusted to reflect the real operational conditions of the bridge. The subproblem approximation method was subsequently utilized to automatically update the FEM. For this purpose, the influences of bearing stiffness, and mass density and Young's modulus of materials were examined as uncertain parameters using sensitivity analysis. The updating objective function was defined based on a summation of squared values of relative errors of natural frequencies between the FEM and experimentation. All the identified modes were used as the target responses with the purpose of putting more constrains for the optimization process and decreasing the number of potentially feasible combinations for parameter changes. The updated FEM of the bridge was able to produce sufficient improvements in natural frequencies in most modes of interest, and can serve for a more precise dynamic response prediction or future investigation of the bridge health.

  3. Aerodynamic stability study of a long-span prestressed concrete cable-stayed bridge. Aerodynamic behavior of edge box girder under uniform flow; Chodai PC shachokyo no taifu anteisei ni kansuru kenkyu. Ichiyoryuchu ni okeru edge girder keishiki no kuriki tokusei

    Energy Technology Data Exchange (ETDEWEB)

    Nomura, T. [Obayashi Corp., Tokyo (Japan)

    1999-01-10

    In recent years, the construction of long-span bridges is on the increase. Prestressed concrete cable-stayed bridges are dynamically very efficient structures of relatively low cost that blend in well with the landscape. Maintenance is also easy. Consequently, the adoption of edge box girders for cable-stayed bridges is increasing worldwide, but problems related to the aerodynamic stability of the structure have emerged. The aerodynamic stability of edge box girders for a prestressed concrete cable-stayed bridge was investigated under uniform flow conditions by conducting several wind tunnel experiments. As a result, the section of the bridge deck was optimized to prevent torsional flutter within an angle of attack varying from -5 to +5 degrees. It is therefore possible to guarantee the aerodynamic stability of long-span prestressed concrete cable-stayed bridges. (author)

  4. Longest cable-stayed bridge TATARA; Longest shachokyo Tatara Ohashi

    Energy Technology Data Exchange (ETDEWEB)

    Fujii, K. [Hiroshima University, Hiroshima (Japan). Faculty of Engineering

    1998-06-15

    The world`s longest cable-stayed bridge Tatara having a central span of 890 m had the both ends closed in August 1997, linking Namakuchi Island and Omishima Island. Final finishing work is continuing for opening of the West Seto Expressway in the spring of 1999. A cable-stayed bridge supports the bridge girders by perpendicular components of tensile force of cables stayed obliquely. On the other hand, there is a concern that the girders may have axial compression force generated due to horizontal components of the force from the cable tensile force, which can cause buckling of the girders. Therefore, in order to suspend the girders efficiently by increasing the perpendicular components of the cable force, and moreover to suppress the axial compression force on the girders, it is more advantageous to make bridge towers high, hence the towers of this bridge are highest among the bridges on the Shimanami Ocean Road. This bridge whose long girders are stayed with 21-stage multi cables presented a problem in designing the buckling in steel girders near the towers due to the horizontal components of the force generated by the bridge. Discussions were given, therefore, by using load withstanding force experiments using a whole bridge model of 1/50 scale, buckling experiments on full-size reinforcing plate models, and load withstanding force analysis using a tower model. A number of other technical discussions were repeated, by which the world`s longest cable-stayed bridge was completed. 9 figs., 1 tab.

  5. Damage Detection for Continuous Bridge Based on Static-Dynamic Condensation and Extended Kalman Filtering

    Directory of Open Access Journals (Sweden)

    Haoxiang He

    2014-01-01

    Full Text Available As an effective and classical method about physical parameter identification, extended Kalman filtering (EKF algorithm is widely used in structural damage identification, but the equations and solutions for the structure with bending deformation are not established based on EKF. The degrees of freedom about rotation can be eliminated by the static condensation method, and the dynamic condensation method considering Rayleigh damping is proposed in order to establish the equivalent and simplified modal based on complex finite element model such as continuous girder bridge. According to the requirement of bridge inspection and health monitoring, the online and convenient damage detection method based on EKF is presented. The impact excitation can be generated only on one location by one hammer actuator, and the signal in free vibration is analyzed. The deficiency that the complex excitation information is needed based on the traditional method is overcome. As a numerical example, a three-span continuous girder bridge is simulated, and the corresponding stiffness, the damage location and degree, and the damping parameter are identified accurately. It is verified that the method is suitable for the dynamic signal with high noise-signal ratio; the convergence speed is fast and this method is feasible for application.

  6. Erection of the stiffening girder of the Akashi Kaikyo bridge; Akashi Kaikyo Ohashi hokoketa (sono 2) koji no genchi seko

    Energy Technology Data Exchange (ETDEWEB)

    Otsuki, M.; Inoue, M.; Ueno, Y.; Matsumura, T.; Oe, S. [Kawasaki Heavy Industries, Ltd., Kobe (Japan)

    1998-12-20

    The Akashi Kaikyo Bridge is 3,911m long with a center span of 1,991m, making it the longest suspension bridge in the world. Much careful attention has been given to the erection planning details in order to construct the bridge to withstand the harsh environmental conditions of that area. This report details the characteristics of the bridge stiffening girder and erection procedure, and the effects of the Hyogoken-Nanbu Earthquake. (author)

  7. Nonlinear seismic analysis of continuous RC bridge

    Directory of Open Access Journals (Sweden)

    Čokić Miloš M.

    2017-01-01

    Full Text Available Nonlinear static analysis, known as a pushover method (NSPA is oftenly used to study the behaviour of a bridge structure under the seismic action. It is shown that the Equivalent Linearization Method - ELM, recommended in FEMA 440, is appropriate for the response analysis of the bridge columns, with different geometric characteristics, quantity and distribution of steel reinforcement. The subject of analysis is a bridge structure with a carriageway plate - a continuous beam with three spans, with the 24 + 40 + 24 m range. Main girder is made of prestressed concrete and it has a box cross section of a constant height. It is important to study the behaviour, not only in the transverse, but also in the longitudinal direction of the bridge axis, when analysing the bridge columns exposed to horizontal seismic actions. The columns were designed according to EN1992, parts 1 and 2. Seismic action analysis is conducted according to EN 1998: 2004 standard. Response spectrum type 1, for the ground type B, was applied and the analysis also includes 20% of traffic load. The analysis includes the values of columns displacement and ductility. To describe the behaviour of elements under the earthquake action in both - longitudinal and transverse direction, pushover curves were formed.

  8. Nonlinear Stability Analysis of a Composite Girder Cable-Stayed Bridge with Three Pylons during Construction

    Directory of Open Access Journals (Sweden)

    Xiaoguang Deng

    2015-01-01

    Full Text Available Based on the nonlinear stability analysis method, the 3D nonlinear finite element model of a composite girder cable-stayed bridge with three pylons is established to research the effect of factors including geometric nonlinearity, material nonlinearity, static wind load, and unbalanced construction load on the structural stability during construction. Besides, the structural nonlinear stability in different construction schemes and the determination of temporary pier position are also studied. The nonlinear stability safety factors are calculated to demonstrate the rationality and safety of construction schemes. The results show that the nonlinear stability safety factors of this bridge during construction meet the design requirement and the minimum value occurs in the maximum double cantilever stage. Besides, the nonlinear stability of the structure in the side of edge-pylon meets the design requirement in the two construction schemes. Furthermore, the temporary pier can improve the structure stability, effectively, and the actual position is reasonable. In addition, the local buckling of steel girder occurs earlier than overall instability under load in some cable tension stages. Finally, static wind load and the unbalanced construction load should be considered in the stability analysis for the adverse impact.

  9. Development of guidelines for transportation of prestressed concrete girders.

    Science.gov (United States)

    2011-11-01

    "Prestressed concrete girders are an economical superstructure system for bridges. With the : advent of higher strength concretes and more effi cient cross sections, the use of long span (>100 : ft.) prestressed girders are now specifi ed. Such long ...

  10. Implementation and field evaluation of pretensioned concrete girder end crack control.

    Science.gov (United States)

    2016-05-01

    Wisconsin bulb tee pretensioned concrete girders are currently used for bridge construction. Their efficiency in load resistance has made them particularly desirable. To provide that efficiency, these girders are heavily prestressed. Cracking is evid...

  11. Active Control of Suspension Bridges

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper some recent research on active control of very long suspension bridges, is presented. The presentation is based on research work at Aalborg University, Denmark. The active control system is based on movable flaps attached to the bridge girder. Wind load on bridges with or without...... flaps attached to the girder is briefly presented. A simple active control system is discussed. Results from wind tunnel experiments with a bridge section show that flaps can be used effectively to control bridge girder vibrations. Flutter conditions for suspension bridges with and without flaps...

  12. Evaluation of post-tensioning of a curved continuous girder using long-gauge fiber optic sensors

    Science.gov (United States)

    Abdel-Jaber, Hiba; Glisic, Branko

    2014-03-01

    Streicker Bridge is a pedestrian bridge on the Princeton University campus. It consists of a main span and four curved continuous girders (legs). The main span and the southeast leg of the bridge are equipped with fiber optic strain and temperature sensors, allowing the bridge to also function as an on-campus laboratory for the Structural Health Monitoring research group. Parallel sensors were embedded at critical cross-sections in the deck prior to the pouring of concrete. The deck of the southeast leg experienced early age cracking within a few days of concrete pouring, which was detected by the strain sensors. Post-tensioning was then performed and it is assumed that it closed off the cracks. Evaluation of post-tensioning forces is complex due to the existence of the cracks, and this paper researches a procedure to estimate the post-tensioning forces at cracked and uncracked locations. The obtained post-tensioning forces were compared to design forces and conclusions regarding the status of post-tensioning were made. This is important as it gives information on the actual health condition and performance of the structure. It also provides information on the safety of the structure. The objective of this paper is to present a methodology for the evaluation of the post-tensioning force along the deck based on strain measurements. The monitoring system, results, data analysis method, and conclusions regarding the bridge health condition and performance are presented in this paper.

  13. Seismic Retrofit of a Multispan Prestressed Concrete Girder Bridge with Friction Pendulum Devices

    Directory of Open Access Journals (Sweden)

    Alberto Maria Avossa

    2018-01-01

    Full Text Available The paper deals with the proposal and application of a procedure for the seismic retrofit of an existing multispan prestressed concrete girder bridge defined explicitly for the use of friction pendulum devices as an isolation system placed between piers top and deck. First, the outcomes of the seismic risk assessment of the existing bridge, performed using an incremental noniterative Nonlinear Static Procedure, based on the Capacity Spectrum Method as well as the Inelastic Demand Response Spectra, are described and discussed. Then, a specific multilevel design process, based on a proper application of the hierarchy of strength considerations and the Direct Displacement-Based Design approach, is adopted to dimension the FPD devices. Furthermore, to assess the impact of the FPD nonlinear behaviour on the bridge seismic response, a device model that reproduces the variation of the normal force and friction coefficient, the bidirectional coupling, and the large deformation effects during nonlinear dynamic analyses was used. Finally, the paper examines the effects of the FPD modelling parameters on the behaviour of the retrofitted bridge and assesses its seismic response with the results pointing out the efficiency of the adopted seismic retrofit solution.

  14. Behaviour of parallel girders stabilised with U-frames

    DEFF Research Database (Denmark)

    Virdi, Kuldeep; Azzi, Walid

    2010-01-01

    Lateral torsional buckling is a key factor in the design of steel girders. Stability can be enhanced by cross-bracing, reducing the effective length and thus increasing the ultimate capacity. U-frames are an option often used to brace the girders when designing through type of bridges and where...... overhead bracing is not practical. This paper investigates the effect of the U-frame spacing on the stability of the parallel girders. Eigenvalue buckling analysis was undertaken with four different spacings of the U-frames. Results were extracted from finite element analysis, interpreted and conclusions...

  15. Seismic Performance of Multi-Span RC Railway Bridges

    DEFF Research Database (Denmark)

    Georgakis, Christos; Barrau, Xavier

    2008-01-01

    Presently, there is no clear method for determining the optimal railway bridge design for a particular ground type and expected seismic intensity. Four main types of RC bridge dominate the current multi-span railway bridge design trends – the Simply Supported Beam, Continuous Box-Girder (CBG), CBG...

  16. Evaluation of the Structure Stability of a Plate Girder Bridge Using MIDAS Structure Analysis

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Eui Soo; Kim, Jong Hyuk [National Forensic Service, Wonju (Korea, Republic of)

    2014-04-15

    Recently, as a means of resolving the issue of legal liability in the event of an accident or a disaster, a wide variety of simulation techniques, such as structural and structure-fluid interaction analysis, have been used in the field of forensic engineering. The plate girder bridge discussed in this paper was being constructed between a pier and an abutment to expand an existing bridge, but an accident whereby the bridge overturned occurred at the end of the concrete laying process for a protective wall. This accident was caused by additional loads not being considered at the time of the design as well as the actual construction being different from the design. The additional loads ultimately generated a negative support force. In this study, we determined the cause of the accident by comparing the structural stability of the original design with that of the additional, non-conforming construction using MIDAS structural analysis.

  17. Evaluation of the Structure Stability of a Plate Girder Bridge Using MIDAS Structure Analysis

    International Nuclear Information System (INIS)

    Kim, Eui Soo; Kim, Jong Hyuk

    2014-01-01

    Recently, as a means of resolving the issue of legal liability in the event of an accident or a disaster, a wide variety of simulation techniques, such as structural and structure-fluid interaction analysis, have been used in the field of forensic engineering. The plate girder bridge discussed in this paper was being constructed between a pier and an abutment to expand an existing bridge, but an accident whereby the bridge overturned occurred at the end of the concrete laying process for a protective wall. This accident was caused by additional loads not being considered at the time of the design as well as the actual construction being different from the design. The additional loads ultimately generated a negative support force. In this study, we determined the cause of the accident by comparing the structural stability of the original design with that of the additional, non-conforming construction using MIDAS structural analysis

  18. Creep analysis and torsional vibration analysis of cable-stayed bridges with two edge composite girders; Nishuketa gosei kozo shachokyo no creep kaiseki to nejiri shindo kaiseki

    Energy Technology Data Exchange (ETDEWEB)

    Hoshino, M. [Nihon University, Tokyo (Japan). College of Science and Technology

    1996-07-21

    This paper describes the creep analysis and torsional vibration analysis of cable-stayed bridges with two edge composite girders. The girder is composed of the concrete slab and the steel girder. I-girders are placed at both edges of the profile. Such a type of bridge was investigated. As the stress migrates by the creep of concrete slab, it is necessary to evaluate the influence of this creep precisely in designing. In the analysis, the composite girder was expressed not by the single member, but by the binary member consisting of concrete member and steel member. Two methods were employed, i.e., method A in which both members are connected by the rigid body beam and method B in which the profile of concrete is converted into the profile of steel. The method A provided better accuracy, but the method B was often sufficient. Torsional rigidity of the open profile structure was much smaller than that of the box profile. As the torsional natural frequency was low, proper torsional vibration analysis was indispensable especially from the viewpoint of wind resistance. Two methods were employed, which utilize the vibration analysis method for general space frame structures. Results of both methods were agreed mutually, but the second method provided better calculation efficiency. 10 refs., 9 figs., 6 tabs.

  19. Double Girder Bridge Crane with Double Cycling: Scheduling Strategy and Performance Evaluation

    Directory of Open Access Journals (Sweden)

    Dandan Wang

    2014-01-01

    Full Text Available This paper introduces a novel quay crane design, double girder bridge crane (DGBC. DGBC is capable of handling containers of two adjacent bays simultaneously, avoiding crane collisions, saving travelling and reposition cost, and eventually improving terminal efficiency. This problem is formulated as a resource-constrained project scheduling with objective to minimize the maximum completion time. A two-stage heuristic algorithm is proposed in which an operating sequences on each bay is obtained by double cycling, and the integrated timetable for both bays is constructed by solving resource conflicts using the proposed minimum cost strategy. We examine effectiveness and performance of applying DGBC with double cycling. A case study is presented to illustrate how DGBC works with the two-stage method. Three extreme cases with respective conflict types are investigated to develop the performance bounds of DGBC with double cycling. The results show that DGBC can significantly improve terminal productivity, and outperforms single girder crane in both makespan and the lift operation percentage. The highest DGBC efficiency does not require maximum double cycles in two bay schedules; rather the integrated timetable for two bays is the main contribution to the DGBC performance as it yields better cooperation between two spreaders and the driver.

  20. Developing Extended Strands in Girder-Cap Beam Connections for Positive Moment Resistance

    Science.gov (United States)

    2017-11-01

    In bridges constructed with precast prestressed concrete girders, resistance to seismic effects is achieved by the interaction between the columns, the cap beam and the girders. These components must be connected to provide flexural resistance. Under...

  1. Analysis of a damaged and repaired pre-stressed concrete bridge girder by vehicle impact and effectiveness of repair procedure

    OpenAIRE

    Domínguez Mayans, Félix

    2014-01-01

    This thesis aims to study the structural consequences of the damages produced by vehicle impact in a pres-stressed concrete bridge girder and the repair procedure in a real case-study damaged after the bridge was opened to service. From the analysis of the situation of the beam and its damage state, a study of the repair actions carried out on this beam has been analyzed in order to determine the efficiency of the repair and if other alternatives are possible or more efficient. A stat...

  2. Implementation of straight and curved steel girder erection design tools construction : summary.

    Science.gov (United States)

    2010-11-05

    Project 0-5574 Curved Plate Girder Design for Safe and Economical Construction, resulted in the : development of two design tools, UT Lift and UT Bridge. UT Lift is a spreadsheet-based program for analyzing : steel girders during lifting while ...

  3. Assessment of Replacement Bridge using Proof Load Test

    Science.gov (United States)

    Sundru, Saibabu

    2017-11-01

    This work begins with an overview of the condition assessment of old bridge and explained reasons for demolishing of the bridge. Briefly presented flexural analysis of two stage post-tensioned prestressed concrete girder, which will be replace the old (new bridge). Construction of I-girder and composite girder at first stage and second stage prestressing respectively is explained with figures. Assessment of the load-caring capacity of the one span of the replacement bridge with simple supports using proof load test is presented which is mandatory according to Indian standards. Weighted sand bags were used to load the bridge up to a predetermined service load with impact factor. Deflections of the I-girders of the bridge were measured at selected locations along and across the bridge span and compared with computed values. Linear response was observed during loading and unloading. Considering the load test results, theoretical estimation and criteria as stipulated in codes of practice, it can be inferred that prestressed concrete I-girder bridge span has adequate capacity to carry the loads and hence, deemed to have passed the test.

  4. Analysis of structural diseases in widened structure due to the shrinkage and creep difference of new bridge

    Science.gov (United States)

    Wu, Wenqing; Zhang, Hui

    2018-03-01

    In order to investigate the possible structural diseases brought to the top flange of existing prestressed concrete box girder bridge due to the shrinkage and creep difference between new and old bridge, the stress state of the existing box girder before and after widening and the mechanisms of potential structural diseases were analyzed using finite element method in this paper. Results showed that the inner flange of the old box girder were generally in the state of large tensile stress, the main reason for which was the shrinkage and creep effect difference of the new and old bridge. And the tensile stress was larger than tensile strength of C50 concrete, which would most likely cause crack in the deck plate of box girder. Hence, reinforcement measures are needed to be designed carefully. Meanwhile, the transverse deformation of widened structure had exceeded the distance between the anti-seismic block and the web of box girder at the end cross section, which would squeeze anti-seismic block severely. Therefore, it is necessary to limit the length of continuous bridge in need of widening.

  5. A technical report on structural evaluation of the Meade County reinforced concrete bridge : research [summary].

    Science.gov (United States)

    2009-01-01

    Meade County Bridge is a two-lane highway reinforced concrete bridge with two girders each with 20 continuous spans. The bridge was built in 1965. It has been reported that in early years of the bridge service period, a considerable amount of cracks ...

  6. Design and construction of superstructure in prestressed concrete cable-stayed bridge. ; Aomori Bay Bridge. PC shachokyo jobuko no sekkei to seko. ; Aomori Bay Bridge

    Energy Technology Data Exchange (ETDEWEB)

    Ishibashi, T.; Fujimori, S.; Oba, M.; Tsuyoshi, T. (East Japan Railway Co., Tokyo (Japan))

    1991-12-01

    Aomori Bay Bridge is a 1,219m long elevated bridge, a part of No.2 Bay Highway of 1,993m in total length crossing over Aomori railway station which was planned in ordecr to integrate the port facilities of Aomori Harbor and expedite cargo traffic smoothly. Of this Bay Bridge, its main bridge portion crossing over Aomori railway station and the sea area was planned as a continuous prestressed concrete cable-stayed bridge of 498m in total length and consisting of three portions including the central portion in which the main span between the central bridge piers was 240m. It is scheduled to open in the summer of 1992. With regard to the design of this bridge, special care for the view of the bridge has been taken covering from the structure style to the accessories. For this bridge, a large scale underground continuous wall solid base with a box-shaped section consisting of 6 chambers was adopted for the base of a main tower. It has the cantilever suspension structure of the wide girder with the inverted Y-shaped pylons. For its stav cable, was adopted a large capacity stay cable with standard tensile strength of 1,942 fabricated on the site and for its covering tube, a FRP tube was adopted. In this article, the construction of the main girder and stay cables, and the construction control during their installation by projection are reported. 7 refs., 14 figs., 9 tabs.

  7. End region detailing of pretensioned concrete bridge girders.

    Science.gov (United States)

    2013-03-01

    End region detailing has significant effect on the serviceability, behavior, and capacity of pretensioned concrete girders. : In this project, experimental and analytical research programs were conducted to evaluate and quantify the effects of : diff...

  8. Economic impact of multi-span, prestressed concrete girder bridges designed as simple span versus continuous span : final report.

    Science.gov (United States)

    2016-10-01

    The objective of this study was to determine the economic impact of designing pre-tensioned prestressed concrete beam (PPCB) : bridges utilizing the continuity developed in the bridge deck as opposed to the current Iowa Department of Transportation (...

  9. Prediction of welding shrinkage deformation of bridge steel box girder based on wavelet neural network

    Science.gov (United States)

    Tao, Yulong; Miao, Yunshui; Han, Jiaqi; Yan, Feiyun

    2018-05-01

    Aiming at the low accuracy of traditional forecasting methods such as linear regression method, this paper presents a prediction method for predicting the relationship between bridge steel box girder and its displacement with wavelet neural network. Compared with traditional forecasting methods, this scheme has better local characteristics and learning ability, which greatly improves the prediction ability of deformation. Through analysis of the instance and found that after compared with the traditional prediction method based on wavelet neural network, the rigid beam deformation prediction accuracy is higher, and is superior to the BP neural network prediction results, conform to the actual demand of engineering design.

  10. Study on the Effect and Mechanism of Aerodynamic Measures for the Vortex-Induced Vibration of Separate Pairs of Box Girders in Cable-Stayed Bridges

    Directory of Open Access Journals (Sweden)

    Han Xin He

    2015-01-01

    Full Text Available Although not always resulting in catastrophic failures, vortex-induced vibration (VIV response can seriously impact the fatigue life and functionality of bridges, especially for separate pairs of box girders in cable-stayed bridges. This study investigates the effects of three aerodynamic measures: grating, inclined web plate, and the baffles on separated box girders in the cable-stayed bridges. The experimental result indicates that the grating of different opening ratios can control the vortex-induced vibration effectively, and the optimized grating opening ratio set in this paper is 40%. Increasing the angle of inclined web plate has a great control on mitigation of the vortex-induced vibration. However, there is an optimum angle where the amplitude of vortex-induced vibration is the smallest at low wind speed. The amplitude of vortex-induced vibration becomes larger with the increase of the web inclined angle that exceeds the optimum angle. Comparatively, the baffles installed on both sides of the inclined webs are more effective to restrain the vortex-induced resonance. The Computational Fluent Dynamics (CFD software is utilized to investigate the mechanism of the experimental results.

  11. Wireless ultrasonic wavefield imaging via laser for hidden damage detection inside a steel box girder bridge

    International Nuclear Information System (INIS)

    An, Yun-Kyu; Song, Homin; Sohn, Hoon

    2014-01-01

    This paper presents a wireless ultrasonic wavefield imaging (WUWI) technique for detecting hidden damage inside a steel box girder bridge. The proposed technique allows (1) complete wireless excitation of piezoelectric transducers and noncontact sensing of the corresponding responses using laser beams, (2) autonomous damage visualization without comparing against baseline data previously accumulated from the pristine condition of a target structure and (3) robust damage diagnosis even for real structures with complex structural geometries. First, a new WUWI hardware system was developed by integrating optoelectronic-based signal transmitting and receiving devices and a scanning laser Doppler vibrometer. Next, a damage visualization algorithm, self-referencing f-k filter (SRF), was introduced to isolate and visualize only crack-induced ultrasonic modes from measured ultrasonic wavefield images. Finally, the performance of the proposed technique was validated through hidden crack visualization at a decommissioned Ramp-G Bridge in South Korea. The experimental results reveal that the proposed technique instantaneously detects and successfully visualizes hidden cracks even in the complex structure of a real bridge. (paper)

  12. Deflection monitoring for a box girder based on a modified conjugate beam method

    Science.gov (United States)

    Chen, Shi-Zhi; Wu, Gang; Xing, Tuo

    2017-08-01

    After several years of operation, a box girder bridge would commonly experience excessive deflection, which endangers the bridge’s life span as well as the safety of vehicles travelling on it. In order to avoid potential risks, it is essential to constantly monitor the defection of box girders. However, currently, the direct deflection monitoring methods are limited by the complicated environments beneath the bridges, such as rivers or other traffic lanes, which severely impede the layouts of the sensors. The other indirect deflection monitoring methods mostly do not thoroughly consider the inherent shear lag effect and shear deformation in the box girder, resulting in a rather large error. Under these circumstances, a deflection monitoring method suiting box girders is proposed in this article, based on the conjugate beam method and distributed long-gauge fibre Bragg grating (FBG) sensor. A lab experiment was conducted to verify the reliability and feasibility of this method under practical application. Further, the serviceability under different span-depth ratios and web thicknesses was examined through a finite element model.

  13. SEISMIC BEHAVIOR OF STEEL MONORAIL BRIDGES UNDER TRAIN LOAD DURING STRONG EARTHQUAKES

    OpenAIRE

    KIM, C. W.; KAWATANI, M.; KANBARA, T.; NISHIMURA, N.

    2013-01-01

    This paper investigated dynamic responses of steel monorail bridges incorporating train-bridge interaction under strong earthquakes. Two types of steel monorail bridges were considered in the study: a conventional type with steel track-girder; an advanced type with composite track-girder and simplified lateral bracing system. During strong earthquakes, monorail train was assumed standing on the track-girder of monorail bridges. Observations through the analytical study showed that considering...

  14. Christian Menn's recent bridge designs - Reducing structural elements to the simplest solution

    OpenAIRE

    Brühwiler, E.; Mahmoud, Khaled M.

    2009-01-01

    The conceptual designs by Christian Menn of four landmark bridges are presented: 1) a 350-m span cable-stayed bridge with jointless deck girder, 2) a cable-stayed bridge with a single “spindle-shaped” pylon, 3) a bridge with an arch reaching high above the deck (both carrying a horizontally curved deck girder), and 4) a cable stayed bridge with three pylons monolithically connected to the deck girder. All of the original bridge designs are driven by the aim to optimize the flow of force...

  15. DISTORTION ANALYSIS OF TILL -WALLED BOX GIRDERS

    African Journals Online (AJOL)

    NIJOTECH

    bridges, buildings, motor vehicles, ships and aircrafts. Due to thinness of the box walls, generalized loads applied to this structure give rise to warping and distortion of ..... Recommendation for Design of. Intermediate Diaphragms in Box. Girders, Transactions of Japanese. Society of Civil Engineers, Vol. 14,1984, pp 121-126.

  16. Economic impact of multi-span, prestressed concrete girder bridges designed as simple span versus continuous span : tech transfer summary.

    Science.gov (United States)

    2016-10-01

    The objective of this study was to determine the economic impact of : designing pre-tensioned prestressed concrete beam (PPCB) bridges : utilizing the continuity developed in the bridge deck as opposed to the : current Iowa Department of Transportati...

  17. Prestressing force monitoring method for a box girder through distributed long-gauge FBG sensors

    Science.gov (United States)

    Chen, Shi-Zhi; Wu, Gang; Xing, Tuo; Feng, De-Cheng

    2018-01-01

    Monitoring prestressing forces is essential for prestressed concrete box girder bridges. However, the current monitoring methods used for prestressing force were not applicable for a box girder neither because of the sensor’s setup being constrained or shear lag effect not being properly considered. Through combining with the previous analysis model of shear lag effect in the box girder, this paper proposed an indirect monitoring method for on-site determination of prestressing force in a concrete box girder utilizing the distributed long-gauge fiber Bragg grating sensor. The performance of this method was initially verified using numerical simulation for three different distribution forms of prestressing tendons. Then, an experiment involving two concrete box girders was conducted to study the feasibility of this method under different prestressing levels preliminarily. The results of both numerical simulation and lab experiment validated this method’s practicability in a box girder.

  18. Effects of CFRP Strengthening on Dynamic and Fatigue Responses of Composite Bridge

    Directory of Open Access Journals (Sweden)

    Kittisak Kuntiyawichai

    2014-01-01

    Full Text Available This paper investigates the effect of CFRP strengthening on dynamic and fatigue responses of composite bridge using finite element program ABAQUS. Dynamic and fatigue responses of composite bridge due to truck load based on AASHTO standard are investigated. Two types of CFRP strengthening techniques, CFRP sheets and CFRP deck, are applied to both the damaged and undamaged bridges. For the case of damaged bridge, two through-thickness crack sizes, 3 mm and 6 mm in depth, are assumed at midspan of the steel girders. Furthermore, effects of the number of steel girders on the dynamic and fatigue responses are also considered. The results show that the maximum responses of composite bridges occur for dual lane cases. By using CFRP as a strengthening material, the maximum stress and deflection of the steel girders reduce and consequently increase the fatigue life of the girders. After introducing initial crack into the steel girders of the composite bridges, the fatigue life of the bridges is dramatically reduced. However, the overall performance of the damaged composite bridge can be improved by using CFRP, albeit with less effectiveness. Therefore, if cracks are found, steel welding must be performed before strengthening the composite bridge by CFRP.

  19. Experimental testing of post-tensioned concrete girders instrumented with optical fibre gratings

    Science.gov (United States)

    Matthys, S.; Taerwe, L.

    2005-05-01

    The integration of optical fibre strain sensors in concrete structures in order to measure deformations has proven to be successful in several applications. Examples of monitored structures by the Magnel Laboratory for Concrete Research are a concrete girder bridge over the Ring Canal by Ghent, a Quay wall at the Ring Canal and a trough girder containing a railway track of a bridge [1,2]. Based on a joint research project the feasibility of integrating Bragg grating sensors in concrete in order to statically and dynamically monitor 17.6 m long prestressed concrete girders has been investigated. During the project 3 post-tensioned concrete girders were tested, submitting them to static and dynamic loading conditions and monitoring the structural behavior with several types of measuring devices, including accelerometers, Bragg gratings, Fabry-Perot gratings, deformeters, crack microscopes, etc. The obtained test results demonstrate the feasibility of optical strain sensors for both static and dynamic measurements. Though it was demonstrated, in the case of dynamic monitoring, that optical strain measurements can be used to directly measure the modal strains, the project also demonstrated that for prestressed concrete the variation in dynamic parameters was insufficient for adequate dynamic monitoring and related damage diagnostics.

  20. The Vibration Based Fatigue Damage Assessment of Steel and Steel Fiber Reinforced Concrete (SFRC Composite Girder

    Directory of Open Access Journals (Sweden)

    Xu Chen

    2015-01-01

    Full Text Available The steel-concrete composite girder has been usually applied in the bridge and building structures, mostly consisting of concrete slab, steel girder, and shear connector. The current fatigue damage assessment for the composite girder is largely based on the strain values and concrete crack features, which is time consuming and not stable. Hence the vibration-based fatigue damage assessment has been considered in this study. In detail, a steel-steel fiber reinforced concrete (SFRC composite girder was tested. The steel fiber reinforced concrete is usually considered for dealing with the concrete cracks in engineering practice. The composite girder was 3.3m long and 0.45m high. The fatigue load and impact excitation were applied on the specimen sequentially. According to the test results, the concrete crack development and global stiffness degradation during the fatigue test were relatively slow due to the favourable performance of SFRC in tension. But on the other hand, the vibration features varied significantly during the fatigue damage development. Generally, it confirmed the feasibility of executing fatigue damage assessment of composite bridge based on vibration method.

  1. Development of guidelines for transportation of long prestressed concrete girders.

    Science.gov (United States)

    2016-12-01

    This research study investigates the behavior of two long prestressed concrete girders during lifting and : transportation from the precast yard to the bridge site, with a particular focus on cracking concerns : during transport. Different response m...

  2. Bridges analysis, design, structural health monitoring, and rehabilitation

    CERN Document Server

    Bakht, Baidar

    2015-01-01

    This book offers a valuable guide for practicing bridge engineers and graduate students in structural engineering; its main purpose is to present the latest concepts in bridge engineering in fairly easy-to-follow terms. The book provides details of easy-to-use computer programs for: ·      Analysing slab-on-girder bridges for live load distribution. ·      Analysing slab and other solid bridge components for live load distribution. ·      Analysing and designing concrete deck slab overhangs of girder bridges under vehicular loads. ·      Determining the failure loads of concrete deck slabs of girder bridges under concentrated wheel loads. In addition, the book includes extensive chapters dealing with the design of wood bridges and soil-steel bridges. Further, a unique chapter on structural health monitoring (SHM) will help bridge engineers determine the actual load carrying capacities of bridges, as opposed to their perceived analytical capacities. The chapter addressing structures...

  3. Geometric nonlinear analysis of self-anchored cable-stayed suspension bridges.

    Science.gov (United States)

    Hui-Li, Wang; Yan-Bin, Tan; Si-Feng, Qin; Zhe, Zhang

    2013-01-01

    Geometric nonlinearity of self-anchored cable-stayed suspension bridges is studied in this paper. The repercussion of shrinkage and creep of concrete, rise-to-span ratio, and girder camber on the system is discussed. A self-anchored cable-stayed suspension bridge with a main span of 800 m is analyzed with linear theory, second-order theory, and nonlinear theory, respectively. In the condition of various rise-to-span ratios and girder cambers, the moments and displacements of both the girder and the pylon under live load are acquired. Based on the results it is derived that the second-order theory can be adopted to analyze a self-anchored cable-stayed suspension bridge with a main span of 800 m, and the error is less than 6%. The shrinkage and creep of concrete impose a conspicuous impact on the structure. And it outmatches suspension bridges for system stiffness. As the rise-to-span ratio increases, the axial forces of the main cable and the girder decline. The system stiffness rises with the girder camber being employed.

  4. Geometric Nonlinear Analysis of Self-Anchored Cable-Stayed Suspension Bridges

    Directory of Open Access Journals (Sweden)

    Wang Hui-Li

    2013-01-01

    Full Text Available Geometric nonlinearity of self-anchored cable-stayed suspension bridges is studied in this paper. The repercussion of shrinkage and creep of concrete, rise-to-span ratio, and girder camber on the system is discussed. A self-anchored cable-stayed suspension bridge with a main span of 800 m is analyzed with linear theory, second-order theory, and nonlinear theory, respectively. In the condition of various rise-to-span ratios and girder cambers, the moments and displacements of both the girder and the pylon under live load are acquired. Based on the results it is derived that the second-order theory can be adopted to analyze a self-anchored cable-stayed suspension bridge with a main span of 800 m, and the error is less than 6%. The shrinkage and creep of concrete impose a conspicuous impact on the structure. And it outmatches suspension bridges for system stiffness. As the rise-to-span ratio increases, the axial forces of the main cable and the girder decline. The system stiffness rises with the girder camber being employed.

  5. Verification of LRFD Bridge Design and Analysis Software for INDOT

    OpenAIRE

    Varma, Amit H.; Seo, Jungil

    2009-01-01

    NCHRP Process 12-50 was implemented to evaluate and verify composite steel I-girder bridge design software used commonly in Indiana. A test-bed of twenty one bridges was developed with the guidance from an Indiana Department of Transportation appointed research advisory panel (RAP). The test-bed included five simple-span and sixteen multi-span bridge superstructures. More than 80 parameters were required to define a bridge and they include bridge span, girder spacing, number of beams, section...

  6. Design and construction of the Natorigawa Bridge; Natorigawa kyoryo no sekkei/seko

    Energy Technology Data Exchange (ETDEWEB)

    Murai, Y.; Oba, M.; Omurata, Y. [JR East Japan Railway Co., Tokyo (Japan); Miyauchi, M.; Iwasaki, I. [Taisei Corp., Tokyo (Japan)

    1997-03-31

    The Natorigawa Bridge is reconstructed. Out of the reconstruction work, a report is made mainly on the design of the superstructure work of the PC panel-stayed bridge and the details of the work. In selecting bridge type, PC simple through beam bridge, steel trussed bridge, PC cable-stayed bridge, and PC panel-stayed bridge are compared, and a 2-span continuous PC panel-stayed bridge is adopted. Its appearance resembles that of the cable-stayed bridge, but the structure resembles a girder bridge. The appropriate span length is the intermediate range between those of the girder bridge and the cable-stayed bridge. Its trafficability is excellent with little deformation by the running of trains because the main beam, diagonal panel, and the main tower are connected rigidly to provide high rigidity of the entire bridge. PRC structure is employed in consideration of the restriction to beam height and economical efficiency. Analyses by a FEM model using two dimensional plane elements and by a few plane frame models as well as comparison of sectional force are performed for this bridge, and a proper plane model is selected. Substructure work, superstructure work and measurement work are described. 3 refs., 16 figs., 6 tabs.

  7. Construction of Daiichi Tamagawa bridge; Daiichi Tamagawa kyoryo no seko

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, O.; Tsuyoshi, T. [East Japan Railway Company, Tokyo (Japan); Ota, T.; Sato, S. [Tekken Corp., Tokyo (Japan)

    1997-05-30

    This paper describes the construction of Daiichi Tamagawa Bridge for JR Tazawako Line, which was reconstructed with the Akita Shinkansen Project apart from the existing line. This bridge is a three-span continuous PC cable stayed bridge. To avoid operation accidents due to snow and ice, independent two-column type with a height of 11 m without beam was employed for the main tower. For the construction of upper part, overhang election construction method was adopted, which can be applied all the year round. The main girder has a single box cross section, and a width of 5.5 m and a beam height of 2.3 m. This was also constructed by the overhang construction method. To reduce the construction period, the main tower was constructed by the precast block construction method. The whole bridge was divided into six blocks by considering the hoist performance of cranes. Reinforcement against bearing pressure and cleavage due to the cable tensile force was conducted by adopting saddle structure for the main tower. Oblique members were jointed with the main girder using lateral beams projected from lateral side of girder. Totally seven PC cables were used for each oblique member. Measurements and management during the overhang construction were also described. The construction was over without problems in August, 1996. This bridge is under test operation using test run vehicles. 2 refs., 20 figs., 7 tabs.

  8. Structural health monitoring of an existing PC box girder bridge with distributed HCFRP sensors in a destructive test

    Science.gov (United States)

    Yang, Caiqian; Wu, Zhishen; Zhang, Yufeng

    2008-06-01

    The application of hybrid carbon fiber reinforced polymer (HCFRP) sensors was addressed to monitor the structural health of an existing prestressed concrete (PC) box girder bridge in a destructive test. The novel HCFRP sensors were fabricated with three types of carbon tows in order to realize distributed and broad-based sensing, which is characterized by long-gauge length and low cost. The HCFRP sensors were bonded on the bottom and side surfaces of the existing bridge to monitor its structural health. The gauge lengths of the sensors bonded on the bottom and side surfaces were 1.5 m and 1.0 m, respectively. The HCFRP sensors were distributed on the bridge for two purposes. One was to detect damage and monitor the structural health of the bridge, such as the initiation and propagation of new cracks, strain distribution and yielding of steel reinforcements. The other purpose was to monitor the propagation of existing cracks. The good relationship between the change in electrical resistance and load indicates that the HCFRP sensors can provide actual infrastructures with a distributed damage detection and structural health monitoring system. Corrections were made to this article on 13 May 2008. The corrected electronic version is identical to the print version.

  9. Structural health monitoring of an existing PC box girder bridge with distributed HCFRP sensors in a destructive test

    International Nuclear Information System (INIS)

    Yang Caiqian; Wu Zhishen; Zhang Yufeng

    2008-01-01

    The application of hybrid carbon fiber reinforced polymer (HCFRP) sensors was addressed to monitor the structural health of an existing prestressed concrete (PC) box girder bridge in a destructive test. The novel HCFRP sensors were fabricated with three types of carbon tows in order to realize distributed and broad-based sensing, which is characterized by long-gauge length and low cost. The HCFRP sensors were bonded on the bottom and side surfaces of the existing bridge to monitor its structural health. The gauge lengths of the sensors bonded on the bottom and side surfaces were 1.5 m and 1.0 m, respectively. The HCFRP sensors were distributed on the bridge for two purposes. One was to detect damage and monitor the structural health of the bridge, such as the initiation and propagation of new cracks, strain distribution and yielding of steel reinforcements. The other purpose was to monitor the propagation of existing cracks. The good relationship between the change in electrical resistance and load indicates that the HCFRP sensors can provide actual infrastructures with a distributed damage detection and structural health monitoring system. Corrections were made to this article on 13 May 2008. The corrected electronic version is identical to the print version

  10. Comprehensive evaluation of fracture critical bridges.

    Science.gov (United States)

    2014-02-01

    Two-girder steel bridges are classified as fracture critical bridges based on the definition given in the AASHTO LRFD Bridge Design Specifications. In a fracture critical bridge a failure of a tension member leads to collapse of the bridge. However, ...

  11. Numerical analysis of dynamic response of vehicle–bridge coupled system on long-span continuous girder bridge

    OpenAIRE

    An, Lipeng; Li, Dejian; Yu, Peng; Yuan, Peng

    2016-01-01

    To systematically study the vehicle–bridge coupled dynamic response and its change rule with different parameters, a vehicle model with seven degrees of freedom was built and the total potential energy of vehicle space vibration system was deduced. Considering the stimulation of road roughness, the dynamic response equation of vehicle–bridge coupled system was established in accordance with the elastic system principle of total potential energy with stationary value and the “set-in-right-posi...

  12. Estimation of Curvature Changes for Steel-Concrete Composite Bridge Using Fiber Bragg Grating Sensors

    OpenAIRE

    Kang, Donghoon; Chung, Wonseok

    2013-01-01

    This study is focused on the verification of the key idea of a newly developed steel-concrete composite bridge. The key idea of the proposed bridge is to reduce the design moment by applying vertical prestressing force to steel girders, so that a moment distribution of a continuous span bridge is formed in a simple span bridge. For the verification of the key technology, curvature changes of the bridge should be monitored sequentially at every construction stage. A pair of multiplexed FBG sen...

  13. Precast concrete elements for accelerated bridge construction : laboratory testing, field testing, evaluation of a precast concrete bridge, Madison County bridge.

    Science.gov (United States)

    2009-01-01

    The importance of rapid construction technologies has been recognized by the Federal Highway Administration (FHWA) and the Iowa : DOT Office of Bridges and Structures. Recognizing this a two-lane single-span precast box girder bridge was constructed ...

  14. stress distribution in continuo ribution in continuous thin ribution

    African Journals Online (AJOL)

    eobe

    studied stresses in thin-walled box girder bridges but stress distribution walled box girder bridges .... the classical thin plate theory and trigonometric series. Lertsima et al. ..... remedied by applying spline finite strip method. Compared to other ...

  15. Gust loading on streamlined bridge decks

    DEFF Research Database (Denmark)

    Larose, Guy; Mann, Jakob

    1998-01-01

    The current analytical description of the buffeting action of wind on long-span bridges is based on the strip assumption. However, recent experiments on closed-box girder bridge decks have shown that this assumption is not valid and is the source of an important part of the error margin...... of the analytical prediction methods. In this paper, an analytical model that departs from the strip assumption is used to describe the gust loading on a thin airfoil. A parallel is drawn between the analytical model and direct measurements of gust loading on motionless closed-box girder bridge decks. Empirical...

  16. Live-Load Testing Application Using a Wireless Sensor System and Finite-Element Model Analysis of an Integral Abutment Concrete Girder Bridge

    Directory of Open Access Journals (Sweden)

    Robert W. Fausett

    2014-01-01

    Full Text Available As part of an investigation on the performance of integral abutment bridges, a single-span, integral abutment, prestressed concrete girder bridge near Perry, Utah was instrumented for live-load testing. The live-load test included driving trucks at 2.24 m/s (5 mph along predetermined load paths and measuring the corresponding strain and deflection. The measured data was used to validate a finite-element model (FEM of the bridge. The model showed that the integral abutments were behaving as 94% of a fixed-fixed support. Live-load distribution factors were obtained using this validated model and compared to those calculated in accordance to recommended procedures provided in the AASHTO LRFD Bridge Design Specifications (2010. The results indicated that if the bridge was considered simply supported, the AASHTO LRFD Specification distribution factors were conservative (in comparison to the FEM results. These conservative distribution factors, along with the initial simply supported design assumption resulted in a very conservative bridge design. In addition, a parametric study was conducted by modifying various bridge properties of the validated bridge model, one at a time, in order to investigate the influence that individual changes in span length, deck thickness, edge distance, skew, and fixity had on live-load distribution. The results showed that the bridge properties with the largest influence on bridge live-load distribution were fixity, skew, and changes in edge distance.

  17. Monitoring system of arch bridge for safety network management

    Science.gov (United States)

    Joo, Bong Chul; Yoo, Young Jun; Lee, Chin Hyung; Park, Ki Tae; Hwang, Yoon Koog

    2010-03-01

    Korea has constructed the safety management network monitoring test systems for the civil infrastructure since 2006 which includes airport structure, irrigation structure, railroad structure, road structure, and underground structure. Bridges among the road structure include the various superstructure types which are Steel box girder bridge, suspension bridge, PSC-box-girder bridge, and arch bridge. This paper shows the process of constructing the real-time monitoring system for the arch bridge and the measured result by the system. The arch type among various superstructure types has not only the structural efficiency but the visual beauty, because the arch type superstructure makes full use of the feature of curve. The main measuring points of arch bridges composited by curved members make a difference to compare with the system of girder bridges composited by straight members. This paper also shows the method to construct the monitoring system that considers the characteristic of the arch bridge. The system now includes strain gauges and thermometers, and it will include various sensor types such as CCTV, accelerometers and so on additionally. For the long term and accuracy monitoring, the latest optical sensors and equipments are applied to the system.

  18. Design and construction of Chichibu-park bridge. Chichibu Koenkyo (kasho) no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Hasuike, H.; Azami, Y. (Saitama Prefectural Government Office, Saitama (Japan) New Structural Engineering, Ltd., Tokyo (Japan)); Yamamoto, T.

    1994-01-31

    The design and construction of the Chichibu-Park Bridge in Japan were outlined which is the symmetric 2-span continuous PC cable stayed road bridge with one main tower (530 m in total length, 392 m in main bridge length, 19 m in width) built over the Arakawa River. The double-suspended four-box main girder with wind noses was adopted because of its excellent torsional rigidity of area and wind proof stability, and the rigid-frame main girder was rigidly connected to the middle main tower. The main tower with an H-type hollow section was adopted considering its workability, and was assembled with its divided 18 blocks. Each side of the main girder was suspended at 30 points spaced at 6.0 m, and the tower ends of the diagonal cables were fixed to the partition inside the main tower taking a landscape into account. The thick stranded wires composed of fine PC steel stranded wires and covered with polyethylene were adopted as diagonal cables, and structural beams were used for both ends of the diagonal cables. Damping wires were also adopted to damp the diagonal cables. 9 refs., 12 figs., 6 tabs.

  19. An overheight vehicle bridge collision monitoring system using piezoelectric transducers

    Science.gov (United States)

    Song, G.; Olmi, C.; Gu, H.

    2007-04-01

    With increasing traffic volume follows an increase in the number of overheight truck collisions with highway bridges. The detection of collision impact and evaluation of the impact level is a critical issue in the maintenance of a concrete bridge. In this paper, an overheight collision detection and evaluation system is developed for concrete bridge girders using piezoelectric transducers. An electric circuit is designed to detect the impact and to activate a digital camera to take photos of the offending truck. Impact tests and a health monitoring test were conducted on a model concrete bridge girder by using three piezoelectric transducers embedded before casting. From the experimental data of the impact test, it can be seen that there is a linear relation between the output of sensor energy and the impact energy. The health monitoring results show that the proposed damage index indicates the level of damage inside the model concrete bridge girder. The proposed overheight truck-bridge collision detection and evaluation system has the potential to be applied to the safety monitoring of highway bridges.

  20. Long-Term Effects of Super Heavy-Weight Vehicles on Bridges

    OpenAIRE

    Wood, Scott M.; Akinci, Necip Onder; Liu, Judy; Bowman, Mark D

    2007-01-01

    A permit truck which exceeds the predefined limit of 108 kips is defined as a superload in Indiana. This study was conducted to examine the long-term effects of superload trucks on the performance of typical slab-on-girder bridges and to assess the likelihood of causing immediate damage. Typical steel and prestressed concrete slab-on-girder type bridges were analyzed using both beam line analysis and detailed finite element models. Furthermore, one prestressed concrete bridge and one steel br...

  1. Chichibu park bridge, a Japan's longest PC cable suspension bridge that attaches importance to scenery. Keikan wo jushishita Nippon saidai no PC shachokyo 'Chichibu koenkyo'

    Energy Technology Data Exchange (ETDEWEB)

    1993-12-01

    This paper introduces the feature of Chichibu Park Bridge, a Japan's longest PC cable suspension bridge that attaches importance to scenery. The maximum effective span of Chichibu Park Bridge which is a two-span continuous PC cable suspension bridge measures 195 m, that means the center span length is equivalent to about 400 m if converted to a three-span structure. With respect to the design that values the scenic effect, the main tower has relief engravings of stone carving tone using Chichibu Night Festival as a motif disposed around it; lighting up is applied to the main tower to highlight it so that it can be viewed from far away places; and a balcony is built on the center of the bridge. Chichibu Park Bridge has the bridge axial direction stagger with the river flow direction at 45[degree] to reduce water resistance. The tensile force generated at the corbel section according to the main tower reactive force is dealt with reinforced concrete rather than with prestressed concrete. The main tower adopts a two-chamber girder structure as its cross section shape from the view points of rigidity assurance and scenic effect. For construction control, micro computers are used to correct growing change in bend of the main girder due to temperature change and cable tension change. 6 figs., 4 tabs.

  2. Investigation of aerodynamic stability by wind response observation during cantilever construction of the Ikara Ohashi bridge; Ikara Ohashi haridashi sekoji no kaze kansoku ni yoru taifu anteisei no kento

    Energy Technology Data Exchange (ETDEWEB)

    Ueno, K.; Mukai, H.; Takeda, T. [Kajima Corp., Tokyo (Japan)

    1995-12-20

    In order to ensure aerodynamic stability during cantilever construction of the Ikara Ohashi Bridge, wind response observation was carried out and discussions were given on the result. The Ikara Ohashi Bridge is a 5-span continuous PC cable-stayed bridge with the central span being a concrete bridge having a length of 260 m, which is the longest in Japan. The bridge was constructed using a method that main girders are extended from the central tower to the right and left sides while the girders are stayed by bracing cables. The bridge construction site is in an area which is often subjected to typhoons and gusts like seasonal winds in winter, hence a discussion on aerodynamic stability of the bridge especially during extension work was viewed as an important matter. In addition, the construction used two small-capacity cables spaced and bundled as the bracing material, which required verification on their aerodynamic stability. In order to identify vibration characteristics of the main girders and the central tower, wind response observation has been performed as soon as the construction was begun. As a result, the vibration characteristics of the main girders and the central tower were identified, and it was verified that vibration shape and dominant frequency can be evaluated properly by an intrinsic value analysis that uses a multi-material point frame model. Furthermore, effects of different vibration absorbing measures were compared, and the effective methods were adopted as the result. 4 refs., 12 figs.

  3. Lateral dynamic interaction analysis of a train girder pier system

    Science.gov (United States)

    Xia, H.; Guo, W. W.; Wu, X.; Pi, Y. L.; Bradford, M. A.

    2008-12-01

    A dynamic model of a coupled train-girder-pier system is developed in this paper. Each vehicle in a train is modeled with 27 degrees-of-freedom for a 4-axle passenger coach or freight car, and 31 for a 6-axle locomotive. The bridge model is applicable to straight and curved bridges. The centrifugal forces of moving vehicles on curved bridges are considered in both the vehicle model and the bridge model. The dynamic interaction between the bridge and train is realized through an assumed wheel-hunting movement. A case study is performed for a test train traversing two straight and two curved multi-span bridges with high piers. The histories of the train traversing the bridges are simulated and the dynamic responses of the piers and the train vehicles are calculated. A field experiment is carried out to verify the results of the analysis, by which the lateral resonant train speed inducing the peak pier-top amplitudes and some other observations are validated.

  4. STUDY OF BRIDGE DECK A REVIEW

    OpenAIRE

    MISS. KSHITIJA S. BALWAN , MR. V. G. KHURD , MR. S. S. CHOUGULE

    2018-01-01

    The objective of this study was to understand the meaning of bridge deck. To know the different forms of decks used in bridge design. To understand different methods used for analysis of deck and study of box girder and its evolution

  5. Hybrid knowledge expert tool for load capacity assessment of railway plate girders with defects

    Science.gov (United States)

    KuŻawa, M.; Bień, J.; Gładysz, M.

    2013-10-01

    Importance of the bridge structures as components of the transportation network is increasing and requires regular development of the management methodology. The main activities are focused on the safety of the users of the transportation network and on the safety of structures, based on monitoring and analysis of the bridge condition changes caused by various types of defects. The paper presents application of the hybrid network technology in the expert tool NOBLA supporting condition assessment of bridge plate girders, taking into account defects of the structures.

  6. Construction of the Usui bridge. Chodai PC shachokyo no kensetsu (Joshin'etsu jidoshado Usuikyo)

    Energy Technology Data Exchange (ETDEWEB)

    Otani, S.; Ogata, T. (Japan Highway Public Corp., Tokyo (Japan))

    1993-10-01

    The Usui Bridge is a long bridge located at the Usui mountain pass on the Joshinetsu Expressway, completed in March 1993. This paper reports from its planning to the design, construction work, and construction management. The bridge is a first two-span continuous prestressed concrete cable-stayed bridge (with a length of 222 m) with one central cable plane ever constructed as a highway bridge in Japan. Its bridge construction features are represented by the main girder consisted of three-chamber type box girder, and the main tower of reversed Y-letter concrete structure. For the fan-shaped stay cable (9-step double cable), a large capacity cable of non-grouting type fabricated at a factory (with a tensile strength of 1500 tf class) was used to simplify the installation work at the site. The one-plane structure utilizing the center belt as a stay cable fixing portion was adopted because of its economic performance superior to a two-plane structure, easiness in consolidating construction works, and assurance of more open space for car traffic. After the completion, the bridge construction has been awarded with the Tanaka Prize of Japan Society of Civil Engineers and the PC Technology Association prize. 26 figs., 4 tabs.

  7. Parametric Study on Responses of a Self-Anchored Suspension Bridge to Sudden Breakage of a Hanger

    Directory of Open Access Journals (Sweden)

    Wenliang Qiu

    2014-01-01

    Full Text Available The girder of self-anchored suspension bridge is subjected to large compression force applied by main cables. So, serious damage of the girder due to breakage of hangers may cause the collapse of the whole bridge. With the time increasing, the hangers may break suddenly for their resistance capacities decrease due to corrosion. Using nonlinear static and dynamic analysis methods and adopting 3D finite element model, the responses of an actual self-anchored suspension bridge to sudden breakage of hangers are studied in this paper. The results show that the sudden breakage of a hanger causes violent vibration and large changes in internal forces of the bridge. In the process of the vibration, the maximum tension of hanger produced by breakage of a hanger exceeds 2.22 times its initial value, and the reaction forces of the bearings increase by more than 1.86 times the tension of the broken hanger. Based on the actual bridge, the influences of some factors including flexural stiffness of girder, torsion stiffness of girder, flexural stiffness of main cable, weight of girder, weight of main cable, span to sag ratio of main cable, distance of hangers, span length, and breakage time of hanger on the dynamic responses are studied in detail, and the influencing extent of the factors is presented.

  8. Parametric study on responses of a self-anchored suspension bridge to sudden breakage of a hanger.

    Science.gov (United States)

    Qiu, Wenliang; Jiang, Meng; Huang, Cailiang

    2014-01-01

    The girder of self-anchored suspension bridge is subjected to large compression force applied by main cables. So, serious damage of the girder due to breakage of hangers may cause the collapse of the whole bridge. With the time increasing, the hangers may break suddenly for their resistance capacities decrease due to corrosion. Using nonlinear static and dynamic analysis methods and adopting 3D finite element model, the responses of an actual self-anchored suspension bridge to sudden breakage of hangers are studied in this paper. The results show that the sudden breakage of a hanger causes violent vibration and large changes in internal forces of the bridge. In the process of the vibration, the maximum tension of hanger produced by breakage of a hanger exceeds 2.22 times its initial value, and the reaction forces of the bearings increase by more than 1.86 times the tension of the broken hanger. Based on the actual bridge, the influences of some factors including flexural stiffness of girder, torsion stiffness of girder, flexural stiffness of main cable, weight of girder, weight of main cable, span to sag ratio of main cable, distance of hangers, span length, and breakage time of hanger on the dynamic responses are studied in detail, and the influencing extent of the factors is presented.

  9. Active Control of Long Bridges Using Flaps

    DEFF Research Database (Denmark)

    Hansen, H. I.; Thoft-Christensen, Palle

    The main problem in designing ultra-long span suspension bridges is flutter. A solution to this problem might be to introduce an active flap control system to increase the flutter wind velocity. The investigated flap control system consists of flaps integrated in the bridge girder so each flap...... is the streamlined part of the edge of the girder. Additional aerodynamic derivatives are shown for the flaps and it is shown how methods already developed can be used to estimate the flutter wind velocity for a bridge section with flaps. As an example, the flutter wind velocity is calculated for different flap...... configurations for a bridge section model by using aerodynamic derivatives for a flat plate. The example shows that different flap configurations can either increase or decrease the flutter wind velocity. for optimal flap configurations flutter will not occur....

  10. Hybrid FRP-concrete bridge deck system final report II : long term performance of hybrid FRP-concrete bridge deck system.

    Science.gov (United States)

    2009-06-01

    This report describes the investigation of the long term structural performance of a : hybrid FRP-concrete (HFRPC) bridge deck on steel girders. The study aimed at : assessing three long term aspects pertaining to the HFRPC bridge deck: (1) creep : c...

  11. Bridge and steel structures. History and vision on bridge erection; Kyoryo kokozobutsu. Kasetsu gijutsu no shorai

    Energy Technology Data Exchange (ETDEWEB)

    Mukai, S.; Hayashi, T. [Sumitomo Heavy Industries, Ltd., Tokyo (Japan)

    1998-08-20

    This paper describes the progress of bridge erection technology. It introduces the results of cable erection, rotated/extruded erection, and cantilever erection. The cable erection is a multi point suspension erection using cables. For the rotated/extruded erection, the monolithic construction is conducted on a working yard set in a right angle to the construction position, and the horizontal beams of the bridge piers (corbel girders) are constructed by the rotated method using a slewing base incorporated around the bridge piers at one side. For the construction of stiffening girders of Innoshima-ohashi Bridge of Honshu-Shikoku Joint Bridge in 1978, trussed face bar blocks were extruded from the main tower in order using a travel crane. For the suspension bridges and cable stayed bridges, main towers were erected using various types of cranes. The erection of Tamashima-ohashi Bridge with a weight of 500 ton using an offshore floating crane is introduced as a large block method. Analysis methods and measurement techniques at the site are used in order to analyze the shape in each step under the erection and to ensure the accurate final complete shape. Reduction of the construction cost, improvement of erection technology, and technology development for large-scale projects are subjects in the future. 22 refs., 8 figs., 1 tab.

  12. Design Optimization of Hybrid FRP/RC Bridge

    Science.gov (United States)

    Papapetrou, Vasileios S.; Tamijani, Ali Y.; Brown, Jeff; Kim, Daewon

    2018-04-01

    The hybrid bridge consists of a Reinforced Concrete (RC) slab supported by U-shaped Fiber Reinforced Polymer (FRP) girders. Previous studies on similar hybrid bridges constructed in the United States and Europe seem to substantiate these hybrid designs for lightweight, high strength, and durable highway bridge construction. In the current study, computational and optimization analyses were carried out to investigate six composite material systems consisting of E-glass and carbon fibers. Optimization constraints are determined by stress, deflection and manufacturing requirements. Finite Element Analysis (FEA) and optimization software were utilized, and a framework was developed to run the complete analyses in an automated fashion. Prior to that, FEA validation of previous studies on similar U-shaped FRP girders that were constructed in Poland and Texas is presented. A finer optimization analysis is performed for the case of the Texas hybrid bridge. The optimization outcome of the hybrid FRP/RC bridge shows the appropriate composite material selection and cross-section geometry that satisfies all the applicable Limit States (LS) and, at the same time, results in the lightest design. Critical limit states show that shear stress criteria determine the optimum design for bridge spans less than 15.24 m and deflection criteria controls for longer spans. Increased side wall thickness can reduce maximum observed shear stresses, but leads to a high weight penalty. A taller cross-section and a thicker girder base can efficiently lower the observed deflections and normal stresses. Finally, substantial weight savings can be achieved by the optimization framework if base and side-wall thickness are treated as independent variables.

  13. Analysis of Biaxially Stressed Bridge Deck Plates

    DEFF Research Database (Denmark)

    Jönsson, Jeppe; Bondum, Tommi Højer

    2012-01-01

    The ultimate state analysis of bridge deck plates at the intersection zone between main girders and transverse beams is complicated by biaxial membrane stresses, which may be in compression or tension in either direction depending on the bridge configuration and the specific location. This paper...

  14. Determination of brace forces caused by construction loads and wind loads during bridge construction : [summary].

    Science.gov (United States)

    2014-04-01

    Bridges are constructed in stages as pilings, : columns, girders, decks, and other components : are added. At each stage, the structure must be : stable. Girders, which add significant weight to : the developing structure, rest on elastomeric : beari...

  15. Wind Turbine Blade with Angled Girders

    DEFF Research Database (Denmark)

    2011-01-01

    The present invention relates to a reinforced blade for a wind turbine, particularly to a blade having a new arrangement of two or more girders in the blade, wherein each of the girders is connected to the upper part and the lower part of the shell and forms an angle with another girder thereby...

  16. Design and test of a girder control system at NSRRC

    International Nuclear Information System (INIS)

    Wang, H.S.; Tsai, Y.L.; Perng, S.Y.; Chen, M.L.; Hsu, K.H.; Lai, W.Y.; Tseng, T.C.; Chen, J.R.

    2012-01-01

    A girder control system is proposed to quickly and precisely adjust the displacement and rotating angle of all girders in the storage ring with little manpower at the Taiwan Photon Source (TPS) project at National Synchrotron Research Center (NSRRC). In this control girder system, six motorized cam movers supporting a girder are driven on three pedestals to perform six-axis adjustments of a girder. A tilt-meter monitors the pitch and roll of each girder; several touch sensors measure the relative displacement between consecutive girders. Moreover, a laser position sensitive detector (PSD) system measuring the relative displacement between straight-section girders is included in this girder control system. Operator can use subroutines developed by MATLAB to control every local girder control system via the web. The test results show that the girder control system adjusts girders quickly, precisely and stably

  17. Structural Behavior of a Long-Span Partially Earth-Anchored Cable-Stayed Bridge during Installation of a Key Segment by Thermal Prestressing

    Directory of Open Access Journals (Sweden)

    Sang-Hyo Kim

    2016-08-01

    Full Text Available This study investigated structural behavior of long-span partially earth-anchored cable-stayed bridges with a main span length of 810 m that use a new key segment closing method based on a thermal prestressing technique. A detailed construction sequence analysis matched with the free cantilever method (FCM was performed using a three-dimensional finite element (FE model of a partially earth-anchored cable-stayed bridge. The new method offers an effective way of connecting key segments by avoiding large movements resulting from the removal of the longitudinal restraint owing to the asymmetry of axial forces in the girders near the pylons. The new method develops new member forces through the process of heating the cantilever system before installing the key segment and cooling the system continuously after installing key segments. The resulting forces developed by the thermal process enhance the structural behavior of partially earth-anchored cable-stayed bridges owing to decreased axial forces in the girders.

  18. An influence of technological contraflexure of crane bridges on its durability

    Directory of Open Access Journals (Sweden)

    Artur BLUM

    2010-01-01

    Full Text Available Standard requirements till 1996 year during bridge crane manufacturing demanded a positive technological contraflexure. As a result of this process were implemented technological compressive stress into tensile zone from inertial and operational loads and tensile stress into compressive zone. This way there were redistributed resultant stress which have increased fatigue strength of exploited crane bridges. Actually valid standard PN-ISO 7363 has removed this obligatory requirement. Its use depends of crane buyer demands. Reduction of initial positive deflection can be seen after few years of crane operations. It is a case of girders permanent deflections increment. Article presents method of technological prestressing of bridge girders with its practical application to obtain positive contrafexure.

  19. Track-Bridge Longitudinal Interaction of Continuous Welded Rails on Arch Bridge

    Directory of Open Access Journals (Sweden)

    Rong Chen

    2013-01-01

    Full Text Available Taking arch bridges, including deck, half-through, and through arch bridges (short for DAB, HTAB, and TAB as examples, mechanics analysis models of longitudinal interaction between continuously welded rails (short for CWRs and arch bridges are established. Based on the finite element method (FEM, the longitudinal interaction calculation software of CWR on arch bridges has been developed. Focusing on an HTAB, the tension, compression, and deflection conditions are calculated and analyzed. The results show that the mechanics analysis models of three types of arch bridges can truly reflect the real state of the structure; the calculation software can be used for systematic research of the CWR on arch bridge; as for HTAB, temperature difference of arch rib has a small effect on rail tension/compression, and arch bridge can be simplified as a continuous beam for rail tension/compression additional force calculation; in calculation of deflection conditions of HTAB, it is suggested that train loads are arranged on half span and full span and take the direction of load entering bridge into account. Additionally, the deflection additional force variation of CFST basket handle arch bridge is different from that of ordinary bridge.

  20. FE-ANN based modeling of 3D Simple Reinforced Concrete Girders for Objective Structural Health Evaluation : Tech Transfer Summary

    Science.gov (United States)

    2017-06-01

    The objective of this study was to develop an objective, quantitative method for evaluating damage to bridge girders by using artificial neural networks (ANNs). This evaluation method, which is a supplement to visual inspection, requires only the res...

  1. Assessing the need for intermediate diaphragms in prestressed concrete bridges.

    Science.gov (United States)

    2008-03-01

    Reinforced concrete intermediate diaphragms (IDs) are currently being used in prestressed concrete (PC) girder bridges in Louisiana. Some of the advantages of providing IDs are disputed in the bridge community; the use of IDs increases the cost and t...

  2. Estimation of Curvature Changes for Steel-Concrete Composite Bridge Using Fiber Bragg Grating Sensors

    Directory of Open Access Journals (Sweden)

    Donghoon Kang

    2013-01-01

    Full Text Available This study is focused on the verification of the key idea of a newly developed steel-concrete composite bridge. The key idea of the proposed bridge is to reduce the design moment by applying vertical prestressing force to steel girders, so that a moment distribution of a continuous span bridge is formed in a simple span bridge. For the verification of the key technology, curvature changes of the bridge should be monitored sequentially at every construction stage. A pair of multiplexed FBG sensor arrays is proposed in order to measure curvature changes in this study. They are embedded in a full-scale test bridge and measured local strains, which are finally converted to curvatures. From the result of curvature changes, it is successfully ensured that the key idea of the proposed bridge, expected theoretically, is viable.

  3. Application of Composite Structures in Bridge Engineering. Problems of Construction Process and Strength Analysis

    Science.gov (United States)

    Flaga, Kazimierz; Furtak, Kazimierz

    2015-03-01

    Steel-concrete composite structures have been used in bridge engineering from decades. This is due to rational utilisation of the strength properties of the two materials. At the same time, the reinforced concrete (or prestressed) deck slab is more favourable than the orthotropic steel plate used in steel bridges (higher mass, better vibration damping, longer life). The most commonly found in practice are composite girder bridges, particularly in highway bridges of small and medium spans, but the spans may reach over 200 m. In larger spans steel truss girders are applied. Bridge composite structures are also employed in cable-stayed bridge decks of the main girder spans of the order of 600, 800 m. The aim of the article is to present the cionstruction process and strength analysis problems concerning of this type of structures. Much attention is paid to the design and calculation of the shear connectors characteristic for the discussed objects. The authors focused mainly on the issues of single composite structures. The effect of assembly states on the stresses and strains in composite members are highlighted. A separate part of problems is devoted to the influence of rheological factors, i.e. concrete shrinkage and creep, as well as thermal factors on the stresses and strains and redistribution of internal forces.

  4. Application of Classical Land Surveying Measurement Methods for Determining the Vertical Displacement of Railway Bridges

    Science.gov (United States)

    Gawronek, Pelagia; Makuch, Maria

    2017-12-01

    The classical measurements of stability of railway bridge, in the context of determining the vertical displacements of the object, consisted on precise leveling of girders and trigonometric leveling of controlled points (fixed into girders' surface). The construction elements, which were measured in two ways, in real terms belonged to the same vertical planes. Altitude measurements of construction were carried out during periodic structural stability tests and during static load tests of bridge by train. The specificity of displacement measurements, the type of measured object and the rail land surveying measurement conditions were determinants to define methodology of altitude measurement. The article presents compatibility of vertical displacements of steel railway bridge, which were developed in two measurement methods. In conclusion, the authors proposed the optimum concept of determining the vertical displacements of girders by using precise and trigonometric leveling (in terms of accuracy, safety and economy of measurement).

  5. Application of Classical Land Surveying Measurement Methods for Determining the Vertical Displacement of Railway Bridges

    Directory of Open Access Journals (Sweden)

    Gawronek Pelagia

    2017-12-01

    Full Text Available The classical measurements of stability of railway bridge, in the context of determining the vertical displacements of the object, consisted on precise leveling of girders and trigonometric leveling of controlled points (fixed into girders' surface. The construction elements, which were measured in two ways, in real terms belonged to the same vertical planes. Altitude measurements of construction were carried out during periodic structural stability tests and during static load tests of bridge by train. The specificity of displacement measurements, the type of measured object and the rail land surveying measurement conditions were determinants to define methodology of altitude measurement. The article presents compatibility of vertical displacements of steel railway bridge, which were developed in two measurement methods. In conclusion, the authors proposed the optimum concept of determining the vertical displacements of girders by using precise and trigonometric leveling (in terms of accuracy, safety and economy of measurement.

  6. Analysis of post-tensioned girders structural behaviour using continuous temperature and strain monitoring

    Science.gov (United States)

    Bednarski, Ł.; Sieńko, R.; Howiacki, T.

    2017-10-01

    This article presents the possibility of using structural health monitoring system data for the analysis of structure’s operation during its life cycle. Within the specific case study it was proved, that continuous, automatic and long term monitoring of selected physical quantities such as strains and temperatures, can significantly improve the assessment of technical condition by identifying hazardous phenomena. In this work the analysis of structural behaviour of post-tensioned girders within the roofing of sport halls in Cracow, Poland, was performed based on measurement results and verified by numerical model carried out in SOFiSTiK software. Thanks to the possibility of performing calculations in real time and informing the manager of the object about abnormalities it is possible to manage the structure in effective way by, inter alia, planning the renovations or supporting decisions about snow removal.

  7. Yonjung High-Speed Railway Bridge Assessment Using Output-Only Structural Health Monitoring Measurements under Train Speed Changing

    Directory of Open Access Journals (Sweden)

    Mosbeh R. Kaloop

    2016-01-01

    Full Text Available Yonjung Bridge is a hybrid multispan bridge that is designed to transport high-speed trains (HEMU-430X with maximum operating speed of 430 km/h. The bridge consists of simply supported prestressed concrete (PSC and composite steel girders to carry double railway tracks. The structural health monitoring system (SHM is designed and installed to investigate and assess the performance of the bridge in terms of acceleration and deformation measurements under different speeds of the passing train. The SHM measurements are investigated in both time and frequency domains; in addition, several identification models are examined to assess the performance of the bridge. The drawn conclusions show that the maximum deflection and acceleration of the bridge are within the design limits that are specified by the Korean and European codes. The parameters evaluation of the model identification depicts the quasistatic and dynamic deformations of PSC and steel girders to be different and less correlated when higher speeds of the passing trains are considered. Finally, the variation of the frequency content of the dynamic deformations of the girders is negligible when high speeds are considered.

  8. Assessment of vehicular live load and load factors for design of short-span bridges according to the new Egyptian Code

    Directory of Open Access Journals (Sweden)

    Hatem M. Seliem

    2015-04-01

    The study shows that concrete box-girders designed according to ECP-201:2012 and ECP-201:2003 using the ultimate limit state method yield almost the same demand. Despite the increase in the VLL of ECP-201:2012, and consequently the live load forces, concrete I-shaped girder bridges will be subjected to less total factored internal forces in comparison to ECP-201:2003 This is attributed to the interaction between the live to dead loads ratio and the load combinations. Design of composite steel plate girder bridges according to ECP-201:2012 using the allowable stress design method yields over designed sections.

  9. Performance of self-consolidating concrete in prestressed girders.

    Science.gov (United States)

    2010-04-01

    A structural investigation of self-consolidating concrete (SCC) in AASHTO Type I precast, : prestressed girders was performed. Six test girders were subjected to transfer length and : flexural testing. Three separate concrete mixtures, two girders pe...

  10. Critical traffic loading for the design of prestressed concrete bridge

    International Nuclear Information System (INIS)

    Hassan, M.I.U.

    2009-01-01

    A study has been carried out to determine critical traffic loadings for the design of bridge superstructures. The prestressed concrete girder bridge already constructed in Lahore is selected for the analysis as an example. Standard traffic loadings according to AASHTO (American Association of State Highway and Transportation Officials) and Pakistan Highway Standards are used for this purpose. These include (1) HL-93 Truck, (2) Lane and (3) Tandem Loadings in addition to (4) Military tank loading, (5) Class-A, (6) Class-B and (7) Class-AA loading, (8) NLC (National Logistic Cell) and (9) Volvo truck loadings. Bridge superstructure including transom beam is analyzed Using ASD and LRFD (Load and Resistance Factor Design) provisions of AASHTO specifications. For the analysis, two longer and shorter spans are selected. This includes the analysis of bridge deck; interior and exterior girder; a typical transom beam and a pier. Dead and live loading determination is carried out using both computer aided and manual calculations. Evaluation of traffic loadings is done for all the bridge components to find out the critical loading. HL-93 loading comes out to be the most critical loading and where this loading is not critical in case of bridge decks; a factor of 1.15 is introduced to make it equivalent with HL-93 -Ioading. SAP-2000 (Structural Engineering Services of Pakistan) and MS-Excel is employed for analysis of bridge superstructure subjected to this loading. Internal forces are obtained for the structural elements of the bridge for all traffic loadings mentioned. It is concluded that HL-93 loading can be used for the design of prestressed concrete girder bridge. Bridge design authorities like NHA (National Highway Authority) and different cities development authorities are using different standard traffic loadings. A number of suggestions are made from the results of the research work related to traffic loadings and method of design. These recommendations may be

  11. Design of Usui bridge (PC cable stayed bridge). Usuihashi (PC shachokyo) no sekkei ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Kido, M.; Iizuka, Y. (Japan Highway Public Corp., Tokyo (Japan)); Tanaka, S.; Otsuka, K. (P.S. Concrete Co. Ltd. Kajima Corp. Joint Venture, Tokyo (Japan)); Kitakuni, S. (Kajima Corp., Tokyo (Japan))

    1991-11-30

    Structure and design of single suspension PC cable bridge, which is first kind of high way bridge in Japan and aiming to start for general use by March, 1993, are reported. As a construction outline, main construction quantity and general layout of the whole bridge together with the selective detail and characteristics of the diagonal member, tower, main girder and tower support member, are cited. Design conditions( load, materials, allowable stress and others ), basic plan of the design, and structure analysis( surface stress framed structure analysis, stereoscopic framework analysis and FEM analysis of local stress ) are explained. Design of structure member like main girder is based on diagonal member tension, wave shearing force, level of diagonal strain stress, bending stress when diagonal member anchors the deformed main tower caused by living load during earth quake, principal stress of main tower junction and local stress etc. Main tower support member design is based on the results of corbel shearing force at varied cross section and main stress, and diagonal member design is decided by allowable stress. Diagonal member anchorage traverse beam design depends on bending moment of traverse beam and shearing force. 3 refs., 15 figs., 1 tab.

  12. Field vibration test of a long-span cable-stayed bridge by large exciters. Daishinpuku kashin ni yoru chodai shachokyo no jikkyo shindo jikken

    Energy Technology Data Exchange (ETDEWEB)

    Okauchi, I. (Chuo University, Tokyo (Japan). Faculty of Science and Engineering); Miyata, T. (Yokohama National University, Yokohama (Japan). Faculty of Engineering); Sasaki, N. (Mitsubishi Heavy Industries, Ltd., Tokyo (Japan)); Tatsumi, M.

    1992-10-15

    Long-span cable-stayed bridge requires indispensably discussions on safety against gale and earthquake, and correct assessment on its inherent vibration characteristics at the design stage is critical. However, theoretical assessment on structural decay is difficult, hence it is desirable to make measurement and verification upon its completion. This paper reports the result of measurements and considerations on a three-span continuous steel cable-stayed bridge with a length of 790 m (185 m + 420 m + 185 m) spanning between Hitsuishi Island and Iwakuro Island in the Kojima-Sakaide route of the Honshu-Shikoku connecting bridge. Large shaking machines were used to give girders vibrations with large amplitudes (10 cm at maximum), and high-accuracy measurements were made. The measurements verified the reasonability of the dynamic design for the bridge. The measured value of the logarithmic decay rate [delta] as the major experimental data presented that bending vibration is large as a whole, with torsional vibration somewhat smaller, and all the design values were on safety side. Confirmation was made on amplitude dependence of the decay rate, the inherent modes of low-order vibrations, and coupled behaviors among the girders, cables, and towers. 16 refs., 13 figs., 3 tabs.

  13. Cable-stayed bridge No. 1 Hikihara bridge'' ( Karauko bridge'') for Kinki construction bureau, ministry of construction. Kensetsusho kinki chiho kensetsukyoku (Hikihara 1 gobashi (Karauko ohashi))no shiko

    Energy Technology Data Exchange (ETDEWEB)

    1991-11-01

    This paper summarizes the design, fabrication and erection of a back-anchor integrated single span cable suspension bridge (178 m long and 9.7 m wide) constructed over an ordinary road crossing a reservoir. This type of structure was adopted because the locational condition does not allow a bridge pier to be erected in the center of the pond, and the topography in the construction starting side has steep slopes and many places having fragile ground beds. This bridge employed precast floor plates using the Compo-Slab (manufactured by Ishikawajima Building Material Company). Main points which require attentions are listed in designing and fabricating the main towers (48 m high), main girders, and cables, as well as fabricating the precast cast floor plates (a panel has a length of 9.7 m, maximum width of 2 m, and maximum weight of 10 tons). The main towers were erected using 160-tf truck cranes, and the main girders were erected by the overhang method using 20-tf gate-type travel cranes. 3 refs., 14 figs.

  14. Wireless Impedance Sensor with PZT-Interface for Prestress-Loss Monitoring in Prestressed Concrete Girder

    International Nuclear Information System (INIS)

    Nguyen, Khac Duy; Lee, So Young; Kim, Jeong Tae

    2011-01-01

    Ensuring the designed prestress force is very important for the safety of prestressed concrete bridge. The loss of prestress force in tendon could significantly reduce load carrying capacity of the structure. In this study, an automated prestress-loss monitoring system for prestressed concrete girder using PZT-interface and wireless impedance sensor node is presented. The following approaches are carried out to achieve the objective. Firstly, wireless impedance sensor nodes are designed for automated impedance-based monitoring technique. The sensor node is mounted on the high-performance Imote2 sensor platform to fulfill high operating speed, low power requirement and large storage memory. Secondly, a smart PZT-interface designed for monitoring prestress force is described. A linear regression model is established to predict prestress-loss. Finally, a system of the PZT-interface interacted with the wireless sensor node is evaluated from a lab-scale tendon-anchorage connection of a prestressed concrete girder

  15. A case study of interior low-frequency noise from box-shaped bridge girders induced by running trains: Its mechanism, prediction and countermeasures

    Science.gov (United States)

    Zhang, Xun; Li, Xiaozhen; Hao, Hong; Wang, Dangxiong; Li, Yadong

    2016-04-01

    A side effect of high-speed railway and urban rail transit systems is the associated vibration and noise. Since the use of concrete viaducts is predominant in railway construction due to scarce land resources, low-frequency (20-200 Hz) structure-radiated noise from concrete bridges is a principal concern. Although it is the most commonly used bridge type, the mechanism of noise emission from box-shaped bridge girders when subjected to impact forces from moving trains, which sounds like beating a drum, has not been well studied. In this study, a field measurement was first made on a simply-supported box-shaped bridge to record the acceleration of the slabs and the associated sound pressures induced by running trains. These data indicated that a significant beat-wave noise occurred in the box-shaped cavity when the train speed was around 340 km/h, which arose from the interference between two sound waves of 75.0 Hz and 78.8 Hz. The noise leakage from the bridge expansion joint was serious and resulted in obvious noise pollution near the bridge once the beat-wave noise was generated in the cavity. The dominant frequency of the interior noise at 75.0 Hz was confirmed from the spectrum of the data and the modal analysis results, and originated from the peak vibration of the top slab due to resonance and the first-order vertical acoustic mode, which led to cavity resonance, amplifying the corresponding noise. The three-dimensional acoustic modes and local vibration modes of the slab were calculated by using the finite element method. A simplified vehicle-track-bridge coupling vibration model was then developed to calculate the wheel-rail interaction force in a frequency range of 20-200 Hz. Numerical simulations using the boundary element method confirmed the cavity resonance effect and the numerical results agreed well with the data. Based on the calibrated numerical model, three noise reduction measures, i.e., adding a horizontal baffle in the interior cavity, narrowing

  16. Evaluating the performance of skewed prestressed concrete bridge after strengthening

    Science.gov (United States)

    Naser, Ali Fadhil; Zonglin, Wang

    2013-06-01

    The objectives of this paper are to explain the application of repairing and strengthening methods on the damaged members of the bridge structure, to analyze the static and dynamic structural response under static and dynamic loads after strengthening, and to evaluate the structural performance after application of strengthening method. The repairing and strengthening methods which are used in this study include treatment of the cracks, thickening the web of box girder along the bridge length and adding internal pre-stressing tendons in the thickening web, and construct reinforced concrete cross beams (diaphragms) between two box girders. The results of theoretical analysis of static and dynamic structural responses after strengthening show that the tensile stresses are decreased and become less than the allowable limit values in the codes. The values of vertical deflection are decreased after strengthening. The values of natural frequencies after strengthening are increased, indicating that the strengthening method is effective to reduce the vibration of the bridge structure. Therefore, the strengthening methods are effective to improve the bearing capacity and elastic working state of the bridge structure and to increase the service life of the bridge structure.

  17. Development of a new-type super-long bridge; Chochotaikyo ni tekigoshita shinkeishiki kyoryo no kaihatsu

    Energy Technology Data Exchange (ETDEWEB)

    Ogawa, K.; Shimodoio, H.; Saito, T.; Nogami, C.; Oryu, T.; Morikawa, M. [Kawasaki Heavy Industries, Ltd., Kobe (Japan)

    1998-12-20

    In order to realize large strait-crossing projects in the near future, it is necessary to develop a new type of super-long span bridge, which has a superior aerodynamic stability and is cost effective. We have been proposed a new type of suspension bridge using a 2-box and 1-box combined girder to apply to such a project And this time, we propose the cable stayed suspension bridge using a 2- box and 1-box combined girder aiming for improvement of aerodynamic stability with increase of torsional rigidity. This paper describes the performance of this cable stayed suspension bridge obtained from aerodynamic analysis. As a result, it can be confirmed that this newly developed cable stayed suspension system has fine characteristics and shows more potential for economical construction than the early proposed suspension system. (author)

  18. Research on Collapse Process of Cable-Stayed Bridges under Strong Seismic Excitations

    Directory of Open Access Journals (Sweden)

    Xuewei Wang

    2017-01-01

    Full Text Available In order to present the collapse process and failure mechanism of long-span cable-stayed bridges under strong seismic excitations, a rail-cum-road steel truss cable-stayed bridge was selected as engineering background, the collapse failure numerical model of the cable-stayed bridge was established based on the explicit dynamic finite element method (FEM, and the whole collapse process of the cable-stayed bridge was analyzed and studied with three different seismic waves acted in the horizontal longitudinal direction, respectively. It can be found from the numerical simulation analysis that the whole collapse failure process and failure modes of the cable-stayed bridge under three different seismic waves are similar. Furthermore, the piers and the main pylons are critical components contributing to the collapse of the cable-stayed bridge structure. However, the cables and the main girder are damaged owing to the failure of piers and main pylons during the whole structure collapse process, so the failure of cable and main girder components is not the main reason for the collapse of cable-stayed bridge. The analysis results can provide theoretical basis for collapse resistance design and the determination of critical damage components of long-span highway and railway cable-stayed bridges in the research of seismic vulnerability analysis.

  19. Disassembly of an arch bridge deformed due to landslide activity and the replacement of a new bridge in the same site. Jisuberi ni yori henkei shita arch bashi no kaitai to shinbashi no kakekae

    Energy Technology Data Exchange (ETDEWEB)

    Sano, S; Morimoto, C; Tomoda, T; Mizukawa, Y; Onushi, M; Ito, T [Kawasaki Heavy Industries, Ltd., Tokyo (Japan)

    1991-10-20

    This report describes the replacement process of an arch bridge deformed due to landslide activity, selection and contents of the disassembly method, and configuration of the new bridge and its design method. The Ryugu Bridge had been damaged by landslides over an extended period. It was a deck arch bridge having originally a span of 74 meters, but it had shortened by 424 mm due to landslide activity during 14 years since its completion. Then it was decided to be replaced by a new bridge having an adjustable structure to support the movement of its abutments. As disassembly of the deformed arch bridge could be dangerous, the best methodology was studied, and the disassembly was carried out by the cable method. The new bridge had box-girder parts in both side of the main truss, so as to be adjustable to the change of the span length, and the bridge was designed for a working life of 50 years if the bearing supports and expansion joints were reset every 10 years. Concerning the connecting parts between the box-girder and the main truss, appropriateness of the sectional configuration was verified by FEM analysis. 9 refs., 18 figs., 2 tab.

  20. Design and construction of Ogawa bridge; Ogawa bashi no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Hori, T.; Chigira, F. [Kajima Corp., Tokyo (Japan); Sakao, H.

    1995-09-30

    Ogawa bridge 230m long by 15.5m wide has been planned on the national road No.401 at Katashina-mura in Gunma Prefecture. Structure mode is two spans continuous PC cable-stayed obliquely system, and a main tower is H type (height: 56m from the road surface) and is located at the center of the bridge alone. This place corresponding to the entrance of Oze famous national park, the main tower is designed so as to have bulge, imaging Mizubasho (lysichiton camtschatcense), from the middle part of the pier to the lower part of the main tower. Arrangement of the cables is designed as two faces of hung fun type and one side face is composed of 13 steel strands (dia. 15.2mm wire x 27 (partly 19); covered with PE tube) in front and rear respectively. A main girder is the box type PC block 2.3m height by 4m or 3m long, and 3m long one is for fastening with a cable. Centering on the main tower, the girder blocks are successively connected in front and rare alternatively and are fastened with cables in part. This overhanging connection work is carried out by two special movable conveyers `Wagens`. 26 figs., 2 tabs.

  1. Dynamic response of a typical synchrotron magnet/girder assembly

    International Nuclear Information System (INIS)

    Jendrzejczyk, J.A.; Smith, R.K.; Vogt, M.E.

    1993-06-01

    In the Advanced Photon Source, the synchrotron booster ring accelerates positrons to the required energy level of 7 GeV. The positrons are then injected into the storage ring where they continue to orbit for 10--15 h. The storage ring quadrupoles have very stringent vibration criteria that must be satisfied to ensure that beam emittance growth is within acceptable limits, viz., <10%. Because the synchrotron booster ring is not operated after particle insertion into the storage ring, its vibration response is not a critical issue relative to the performance of the storage ring beam. Nevertheless, the synchrotron pulses at a frequency of 2 Hz, and if a vibration response frequency of the synchrotron magnet/girder assembly were to coincide with the pulsation frequency or its near harmonics, large-amplitude motion could result, with the effect that it could compromise the operation of the synchrotron. Due to the complex dynamics of the synchrotron magnet/girder assembly, it is necessary to measure the dynamic response of a prototypic assembly and its components to ensure that the inherent dynamic response frequencies are not equal to 2 Hz or any near harmonics. Dynamic-response measurement of the synchrotron girder assembly and component magnets is the subject of this report

  2. Fabrication and erection of 'Chuo ohashi bridge' for Tokyo Metropolitan Government. Tokyoto kensetsukyoku 'Chuo ohashi' no seisaku oyobi kasetsu

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    The present report outlines the superstructure of 'Chuo Ohashi Bridge' spanning the Sumida River, Tokyo Metropolis. Being 210.7m in length and 25.0m in breadth, that bridge is a cable-stayed bridge partially curved with a 220m radius curvature. Having a height of 76.8m, its main tower is shaped into an upside-down V with a curved top. Description of the points of which care was specially taken for the fabrication and construction in yard covers the cable anchorage of both girders and tower, assembly and welding, anti-shrinkage camber of girders, weld bevel preparation for the tower, tentative assembly, and accuracy control. Results of the wind tunnel test with a (1/50) scale model are as follows: stay cables were installed as measures against the vibration during the main tower erection. The main girders, main tower and cables were the order of superstructural erection. The cable tensioning was supervised mainly with its proper tension adjustment and subsidiarily for the configuration of bridge built. 2 refs., 10 figs., 1 tab.

  3. Behaviour of Steel Fibre Reinforced Rubberized Continuous Deep Beams

    Science.gov (United States)

    Sandeep, MS; Nagarajan, Praveen; Shashikala, A. P.

    2018-03-01

    Transfer girders and pier caps, which are in fact deep beams, are critical structural elements present in high-rise buildings and bridges respectively. During an earthquake, failure of lifeline structures like bridges and critical structural members like transfer girders will result in severe catastrophes. Ductility is the key factor that influences the resistance of any structural member against seismic action. Structural members cast using materials having higher ductility will possess higher seismic resistance. Previous research shows that concrete having rubber particles (rubcrete) possess better ductility and low density in comparison to ordinary concrete. The main hindrance to the use of rubcrete is the reduction in compressive and tensile strength of concrete due to the presence of rubber. If these undesirable properties of rubcrete can be controlled, a new cementitious composite with better ductility, seismic performance and economy can be developed. A combination of rubber particles and steel fibre has the potential to reduce the undesirable effect of rubcrete. In this paper, the effect of rubber particles and steel fibre in the behaviour of two-span continuous deep beams is studied experimentally. Based on the results, optimum proportions of steel fibre and rubber particles for getting good ductile behaviour with less reduction in collapse load is found out.

  4. Strength monitoring of bridge constructions and features of its application. Part 2. Continuous monitoring of bridge construction status

    Directory of Open Access Journals (Sweden)

    Ovchinnikov Igor Georgievich

    2014-06-01

    Full Text Available The article describes a system of continuous monitoring of bridge constructions — a system of observation over the operating conditions and behavior of the bridge structure, which is aimed at ensuring the preservation of its functional application properties within the specified limits, realized on the continuous, long-term basis with the use of instrumentation and ensures on-line presentation of information on the status of structure. To illustrate, one may consider the existing systems of continuous monitoring for a number of bridge constructions in the United States, Japan, Europe, South Korea, Greece and Russia. The article suggests to examine the systems of continuous monitoring of «Commodore John Barry» truss bridge, «Akashi-Kaikyo» suspension bridge, «Siggenthal» reinforced-concrete arch bridge, «Nimhe» suspension bridge, «Jindo»cable-stayed bridge, «Yandzhon» suspension bridge, «Banghwa» bridge, «Seohae» bridge and «Rio-Antirrio» bridge. In addition one may consider monitoring of the longitudinal launching of the bridge superstructures over the Volga River near the village Pristannoye in Saratov region. Finally, it was drawn the conclusion that monitoring of bridge constructions from the standpoint of their consumers is aimed at solving such important problems as preservation of bridge structures, increase in service life of bridge structures through timely detection of faults and their elimination, as well as preservation of bridge structure carrying capacity by controlling their behavior during the operation and improving the efficiency of expenditure of monetary resources for repair activities by correct determination of time and type of the necessary repair.

  5. Static behaviors of long-span cable-stayed bridge; Chodai shachokyo no seiteki kyodo ni kansuru kosatsu

    Energy Technology Data Exchange (ETDEWEB)

    Xie, Xu [Saitama Univ., Saitama (Japan). Graduate School; Yamaguchi, H.; Ito, M. [Saitama Univ., Urawa (Japan). Faculty of Engineering

    1996-04-21

    In this study, incremental equation of cable-stayed bridge is formulated by finite element method taking the geometrical nonlinear analysis into account. Then, as an example of designing a bridge with 1500m span, setting up the initial tension, analysis of in-plane behavior caused by live loads as well as analysis of the behavior against wind caused by out-of-plane wind load that are necessary for designing a bridge with 1500m span are carried out. The main results obtained through the study are as follows. As for the cable stayed bridge with 1500m center super long-span having supplementary supporting points between the side arms, the geometrical non-linearity caused by the in-plane design live loads is not remarkable. The effects of wind which acts on girders on analysis of the behaviors against wind are different depending on the aerodynamic performance of the girder and in the case of high wind speed, strong effects on the behavior against wind of the in-plane and screws generate. As the changing of tension of the cable makes influences on the force of in-plane cross section and on displacement of the girder, if the wind speed is very high, the analysis results of the behaviors against wind of in-plane and screws of the cable-stayed bridge may be different depending on in what manner the wind load on the cable to be treated. 16 refs., 16 figs., 1 tab.

  6. Structure-borne noise of railway composite bridge: Numerical simulation and experimental validation

    Science.gov (United States)

    Li, Xiaozhen; Liu, Quanmin; Pei, Shiling; Song, Lizhong; Zhang, Xun

    2015-09-01

    In order to investigate the characteristics of the noise from steel-concrete composite bridges under high-speed train loading, a model used to predict the bridge-borne noise is established and validated through a field experiment. The numerical model for noise prediction is developed based on the combination of spatial train-track-bridge coupled vibration theory and Statistical Energy Analysis (SEA). Firstly, train-track-bridge coupled vibration is adopted to obtain the velocity time history of the bridge deck vibration. Then, the velocity time history is transferred into frequency domain through FFT to serve as the vibratory energy of SEA deck subsystems. Finally, the transmission of the vibratory energy is obtained by solving the energy balance equations of SEA, and the sound radiation is computed using the vibro-acoustic theory. The numerically computed noise level is verified by a field measurement. It is determined that the dominant frequency of steel-concrete composite bridge-borne noise is 20-1000 Hz. The noise from the bottom flange of steel longitudinal girder is less than other components in the whole frequency bands, while the noise from web of steel longitudinal girder is dominant in high frequency range above 315 Hz. The noise from concrete deck dominates in low-frequency domain ranges from 80 Hz to 160 Hz.

  7. Lateral vibration analysis of continuous bridges utilizing equal displacement rule

    Directory of Open Access Journals (Sweden)

    Biao Wei

    Full Text Available The application of equal displacement rule simplifies the evaluation of lateral displacement demand forSDOF system. For complex multi-degree-of-freedom (MDOF structures such as continuous bridge systems, however, it requires more investigations. In this paper, a comprehensive parametric study of the ratio of maximum inelastic displacement to maximum elastic displacement for typical continuous bridges is performedto advance the application of equal displacement rule to MDOF systems. Particurlarly for the bridges with long periods, this adapted methodlogy is further simplified. It is concluded that equal displacement rule of MDOF is applicable to continuous bridges when the periods of the main modes are no less than the limiting period, which usually serves as an indication to the level of inelastic deformation for a bridge subjected to an earthquake.

  8. Impact Coefficient Analysis of Long-Span Railway Cable-Stayed Bridge Based on Coupled Vehicle-Bridge Vibration

    Directory of Open Access Journals (Sweden)

    Yongle Li

    2015-01-01

    Full Text Available Compared with medium and small span bridges, very limited attention has been paid on the research of the impact coefficient of long-span railway bridges. To estimate the impact effects of long-span railway bridges subjected to moving vehicles, a real long-span railway cable-stayed bridge is regarded as the research object in this study, and a coupled model of vehicle-bridge system is established. The track irregularities are taken as the system excitation and the dynamic responses of the vehicle-bridge system are calculated. The impact effects on main girder, stayed cable, bearings, and bridge tower are discussed at various vehicle speeds. The results show that different components of the long-span railway cable-stayed bridge have different impact coefficients. Even for each part, the impact coefficient is also different at different local positions. It reveals that the impact coefficients in the actual situation may have significant differences with the related code clauses in the present design codes.

  9. Evaluating the time-dependent and bond characteristics of lightweight concrete mixes for Kansas prestressed concrete bridges : technical summary.

    Science.gov (United States)

    2011-07-01

    The majority of the bridges in Kansas are in rural areas. Many of these are : becoming structurally deficient, and are in need of replacement. Due to the location of : these bridges, cost of transporting prestressed girders to these areas often makes...

  10. Deflection control system for prestressed concrete bridges by CCD camera. CCD camera ni yoru prestressed concrete kyo no tawami kanri system

    Energy Technology Data Exchange (ETDEWEB)

    Noda, Y.; Nakayama, Y.; Arai, T. (Kawada Construction Co. Ltd., Tokyo (Japan))

    1994-03-15

    For the long-span prestressed concrete bridge (continuous box girder and cable stayed bridge), the design and construction control becomes increasingly complicated as construction proceeds because of its cyclic works. This paper describes the method and operation of an automatic levelling module using CCD camera and the experimental results by this system. For this automatic levelling system, the altitude can be automatically measured by measuring the center location of gravity of the target on the bridge surface using CCD camera. The present deflection control system developed compares the measured value by the automatic levelling system with the design value obtained by the design calculation system, and manages them. From the real-time continuous measurement for the long term, in which the CCD camera was set on the bridge surface, it was found that the stable measurement accuracy can be obtained. Successful application of this system demonstrates that the system is an effective and efficient construction aid. 11 refs., 19 figs., 1 tab.

  11. Analysis of Temperature and Longitudinal Stress of Very Large Flat Steel Box Girder in Cold Areas%寒冷地区特大扁平钢箱梁温度及纵向应力分析

    Institute of Scientific and Technical Information of China (English)

    胡铁明; 苟红兵; 张冠华; 丁科翔

    2015-01-01

    为指导寒冷地区钢箱梁桥的设计 ,以主跨436 m的钢箱梁斜拉桥——辽河特大桥为研究对象 ,对其扁平钢箱梁进行了为期8个月的温度监测 ,采用对比分析、极值分析、概率统计等方法分析钢箱梁跨中截面温度及纵向应力日变化趋势、总体变化规律及温度对纵向应力的影响情况.结果表明 :环境温度在20~45 ℃时 ,桥梁设计规范计算得到的钢箱梁顶板温度最大值小于实际监测值 ;钢箱梁连续24 h温度变化服从正弦曲线分布 ,纵向应力每天前6 h变化服从线性分布 ,后18 h服从高斯曲线分布 ;24h内温度极值点时的温度效应为其它活荷载总效应的5.7~6.5倍 ;顶板冬季最冷月平均纵向应力相比夏季最热月低12~35 M Pa ,底板冬季最冷月平均纵向应力相比夏季低12~16 M Pa.%To direct the design of steel box girder bridge in cold areas , the Liaohe River Bridge ,a steel box girder cable-stayed bridge with a main span of 436 m ,was taken as the study background ,the flat steel box girder of which experienced temperature monitoring lasting 8 months.A series of analytical methods ,including contrastive analysis ,ultimate value analysis and probabilistic computing were adopted to analyze the trend of daily variation of midspan cross-sec-tion temperature and longitudinal stress of steel box girder as well as the general variation law and the effect of temperature on longitudinal stress.The results of the analysis indicate that the maxi-mum value of the top plate temperature of steel box girder calculated in accordance with the bridge design specification is less than the actual measured value w hen the ambient temperature is around 20~45℃.The 24 h continuous temperature variation of the steel box girder conforms to the sinu-soidal distribution ,the first 6 h variation of longitudinal stress in each day complies with linear dis-tribution and the following 18 h longitudinal stress variation obeys Gaussian

  12. Discrete vortex method simulations of aerodynamic admittance in bridge aerodynamics

    DEFF Research Database (Denmark)

    Rasmussen, Johannes Tophøj; Hejlesen, Mads Mølholm; Larsen, Allan

    , and to determine aerodynamic forces and the corresponding flutter limit. A simulation of the three-dimensional bridge responseto turbulent wind is carried out by quasi steady theory by modelling the bridge girder as a line like structure [2], applying the aerodynamic load coefficients found from the current version......The meshless and remeshed Discrete Vortex Method (DVM) has been widely used in academia and by the industry to model two-dimensional flow around bluff bodies. The implementation “DVMFLOW” [1] is used by the bridge design company COWI to determine and visualise the flow field around bridge sections...

  13. Onboard monitoring of fatigue damage rates in the hull girder

    DEFF Research Database (Denmark)

    Nielsen, Ulrik Dam; Jensen, Jørgen Juncher; Pedersen, Preben Terndrup

    2011-01-01

    Most new advanced ships have extensive data collection systems to be used for continuous monitoring of engine and hull performance, for voyage performance evaluation etc. Such systems could be expanded to include also procedures for stress monitoring and for decision support, where the most...... critical wave-induced ship extreme responses and fatigue damage accumulation can be estimated for hypothetical changes in ship course and speed in the automatically estimated wave environment.The aim of this paper is to outline a calculation procedure for fatigue damage rate prediction in hull girders...... taking into account whipping stresses. It is conceptually shown how such a method, which integrates onboard estimation of sea states, can be used to deduce decision support with respect to the accumulated fatigue damage in the hull girder.The paper firstly presents a set of measured full-scale wave...

  14. Design and test of box girder for a large wind turbine blade

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Per H.; Tesauro, A.; Bitsche, R. [Technical Univ. of Denmark. DTU Wind Energy, DTU Risoe Campus, Roskilde (Denmark)] [and others

    2012-09-15

    This report is covering the structural design and full scale test of a box girder as a part of the project ''Demonstration of new blade design using manufacturing process simulations'' supported by the EUDP program. A box girder with a predetermined outer geometry was designed using new inventions, which create an inner structure in the box girder. With a combination of advanced FEM analysis and the inventions it was possible to reduce the material thickness of the cap by up to 40%. The new design of the box girder was manufactured at SSP Technology A/S, where it was demonstrated that the manufacturing process could include the new inventions. Subsequently the box girder was transported to the blade test facility at DTU Wind Energy. A series of test was performed with the blade to investigate the behaviour during loading, and finally the girder was loaded to ultimate failure. The report includes the description of the test setup, the test and an overview over the results from the test performed on the box girder. During the final test the box girder failed at 58 % of the expected ultimate load. Unfortunately, no definite conclusion could be made concerning the failure mechanism. (Author)

  15. Dynamic Analysis of Cable-Stayed Bridges Affected by Accidental Failure Mechanisms under Moving Loads

    Directory of Open Access Journals (Sweden)

    Fabrizio Greco

    2013-01-01

    Full Text Available The dynamic behavior of cable-stayed bridges subjected to moving loads and affected by an accidental failure in the cable suspension system is investigated. The main aim of the paper is to quantify, numerically, the dynamic amplification factors of typical kinematic and stress design variables, by means of a parametric study developed in terms of the structural characteristics of the bridge components. The bridge formulation is developed by using a geometric nonlinear formulation, in which the effects of local vibrations of the stays and of large displacements in the girder and the pylons are taken into account. Explicit time dependent damage laws, reproducing the failure mechanism in the cable system, are considered to investigate the influence of the failure mode characteristics on the dynamic bridge behavior. The analysis focuses attention on the influence of the inertial characteristics of the moving loads, by accounting coupling effects arising from the interaction between girder and moving system. Sensitivity analyses of typical design bridge variables are proposed. In particular, the effects produced by the moving system characteristics, the tower typologies, and the failure mode characteristics involved in the cable system are investigated by means of comparisons between damaged and undamaged bridge configurations.

  16. STRESS-DEFORMED STATE OF A STRUT-FRAMED CRANE GIRDER

    Directory of Open Access Journals (Sweden)

    Kh. M. Muselemov

    2017-01-01

    Full Text Available Objectives. The aim of the present work is to study the influence of design parameters on the stress-deformed state of a sprengel crane girder; to compile the tables and corresponding graphs illustrating changes in internal force factors in the characteristic cross-sections of the system elements under consideration. The article describes the study of the stress-deformed state (SDS of a metal strut-framed crane girder.Methods. Numerical methods of analysis based on the use of the Green's function are used during solving this problem. A dimensionless parameter is introduced, depending on which the tables and graphs are constructed. According to the known algorithm, the calculations of internal force factors in the sections of the considered construction are performed.Results. Depending on the dimensionless parameter characterising the geometry and physical features of the system, tables of bending moments and transverse forces are compiled. According to these tables, the appropriate graphs are plotted in order to choose easily the optimal design parameters.Conclusion. The dependence of the moments and transverse forces on the dimensionless parameter k was found, the corresponding graphs were plotted and the metal costs for the girders were calculated. The minimum values of the moments and transverse forces are established to take place when the dimensionless parameter k values are close to zero. The most economical was a strut-framed crane girder having k = 0.0001. The most uneconomical had k = 0.05 and k =∞. Eventually, the sprengel girders were found to be more profitable as compared to conventional crane girders. In the examples considered in the article, the metal savings amounted up to 14%. The presented methodology allows the calculation and designing of strut-framed crane girders with two racks to be carried out. 

  17. Impact of measurement uncertainty from experimental load distribution factors on bridge load rating

    Science.gov (United States)

    Gangone, Michael V.; Whelan, Matthew J.

    2018-03-01

    Load rating and testing of highway bridges is important in determining the capacity of the structure. Experimental load rating utilizes strain transducers placed at critical locations of the superstructure to measure normal strains. These strains are then used in computing diagnostic performance measures (neutral axis of bending, load distribution factor) and ultimately a load rating. However, it has been shown that experimentally obtained strain measurements contain uncertainties associated with the accuracy and precision of the sensor and sensing system. These uncertainties propagate through to the diagnostic indicators that in turn transmit into the load rating calculation. This paper will analyze the effect that measurement uncertainties have on the experimental load rating results of a 3 span multi-girder/stringer steel and concrete bridge. The focus of this paper will be limited to the uncertainty associated with the experimental distribution factor estimate. For the testing discussed, strain readings were gathered at the midspan of each span of both exterior girders and the center girder. Test vehicles of known weight were positioned at specified locations on each span to generate maximum strain response for each of the five girders. The strain uncertainties were used in conjunction with a propagation formula developed by the authors to determine the standard uncertainty in the distribution factor estimates. This distribution factor uncertainty is then introduced into the load rating computation to determine the possible range of the load rating. The results show the importance of understanding measurement uncertainty in experimental load testing.

  18. Design and test of box girder for a large wind turbine blade

    DEFF Research Database (Denmark)

    Nielsen, Per Hørlyk; Tesauro, Angelo; Bitsche, Robert

    This report is covering the structural design and full scale test of a box girder as a part of the project “Demonstration of new blade design using manufacturing process simulations” supported by the EUDP program. A box girder with a predetermined outer geometry was designed using new inventions...... that the manufacturing process could include the new inventions. Subsequently the box girder was transported to the blade test facility at DTU Wind Energy. A series of test was performed with the blade to investigate the behaviour during loading, and finally the girder was loaded to ultimate failure. The report includes...... the description of the test setup, the test and an overview over the results from the test performed on the box girder. During the final test the box girder failed at 58 % of the expected ultimate load. Unfortunately, no definite conclusion could be made concerning the failure mechanism....

  19. Increased of the capacity integral bridge with reinforced concrete beams for single span

    Science.gov (United States)

    Setiati, N. Retno

    2017-11-01

    Sinapeul Bridge that was built in 2012 in Sumedang is a bridge type using a full integral system. The prototype of integral bridge with reinforced concrete girder and single span 20 meters until this year had decreased capacity. The bridge was conducted monitoring of strain that occurs in the abutment in 2014. Monitoring results show that based on the data recorded, the maximum strain occurs at the abutment on the location of the integration of the girder of 10.59 x 10-6 tensile stress of 0.25 MPa (smaller than 150 x 10-6) with 3 MPa tensile stress as limit the occurrence of cracks in concrete. Sinapeul bridge abutment with integral system is still in the intact condition. Deflection of the bridge at the time of load test is 1.31 mm. But this time the bridge has decreased exceeded permission deflection (deflection occurred by 40 mm). Besides that, the slab also suffered destruction. One cause of the destruction of the bridge slab is the load factor. It is necessary for required effort to increase the capacity of the integral bridge with retrofitting. Retrofitting method also aims to restore the capacity of the bridge structure due to deterioration. Retrofitting can be done by shortening of the span or using Fibre Reinforced Polymer (FRC). Based on the results obtained by analysis of that method of retrofitting with Fibre Reinforced Polymer (FRC) is more simple and effective. Retrofitting with FRP can increase the capacity of the shear and bending moment becomes 41% of the existing bridge. Retrofitting with FRP method does not change the integral system on the bridge Sinapeul become conventional bridges.

  20. Design and construction of the Daini-Chikumagawa bridge; Dai ni Chikumagawa kyoryo no sekkei to seko

    Energy Technology Data Exchange (ETDEWEB)

    Inaba, N.; Takasusuki, K.; Hirasawa, T.; Kanamori, M.

    1996-01-30

    The Daini-Chikumagawa bridge, having spans of 134m {times} 2 which is the largest in Japan as the concrete railroad, is a prestressed concrete (PC) oblique cable-stayed bridge building on the Hokuriku Shinkansen express line which is constructing towards Nagano Olympic (Feb.1998). Regarding adoption of the oblique cable-stayed bridge for the railroad bridge, there are very few examples on a global scale and in Japan besides this bridge there is only one example (Omoto bridge (Iwate pref.), span = 85m). One H type tower (H = 65m from the surface of bridge) is erected at the center of the Chikuma river and then main girders are built at the front and rear of this tower. These main girders, being separated into 5m {times} 24 blocks per one side excepting surroundings of the tower, are fabricated as a three room box type PC block (total width 12.8m; height 3.0m) each on the river beach near the spot. These blocks are jointed from the tower side by the overhanging work using the constructing vehicles and are fixed with oblique materials (cables; two face hanging system) at intervals of 10m. 4 refs., 16 figs., 5 tabs.

  1. A Damage Prognosis Method of Girder Structures Based on Wavelet Neural Networks

    Directory of Open Access Journals (Sweden)

    Rumian Zhong

    2014-01-01

    Full Text Available Based on the basic theory of wavelet neural networks and finite element model updating method, a basic framework of damage prognosis method is proposed in this paper. Firstly, a damaged I-steel beam model testing is used to verify the feasibility and effectiveness of the proposed damage prognosis method. The results show that the predicted results of the damage prognosis method and the measured results are very well consistent, and the maximum error is less than 5%. Furthermore, Xinyihe Bridge in the Beijing-Shanghai Highway is selected as the engineering background, and the damage prognosis is conducted based on the data from the structural health monitoring system. The results show that the traffic volume will increase and seasonal differences will decrease in the next year and a half. The displacement has a slight increase and seasonal characters in the critical section of mid span, but the strain will increase distinctly. The analysis results indicate that the proposed method can be applied to the damage prognosis of girder bridge structures and has the potential for the bridge health monitoring and safety prognosis.

  2. Wave induced extreme hull girder loads on containerships

    DEFF Research Database (Denmark)

    Jensen, Jørgen Juncher; Pedersen, Preben Terndrup; Shi, Bill

    2009-01-01

    This paper provides simple but rational procedures for prediction of extreme wave – induced sectional hull girder forces with reasonable engineering accuracy. The procedures take into account main ship hull characteristics such as: length, breadth, draught, block coefficient, bow flare coefficient......, forward speed and hull flexibility. The vertical hull girder loads are evaluated for specific operational profiles. Firstly a quadratic strip theory is presented which can give separate predictions for the hogging and sagging bending moments and shear forces and for hull girder loads. Then this procedure...... is based on rational methods it can be applied for novel single hull ship types not presently covered by the rules of the classification societies or to account for specific operational profiles....

  3. Monitoring Bridge Dynamic Responses Using Fiber Bragg Grating Tiltmeters.

    Science.gov (United States)

    Xiao, Feng; Chen, Gang S; Hulsey, J Leroy

    2017-10-20

    In bridge health monitoring, tiltmeters have been used for measuring rotation and curvature; however, their application in dynamic parameter identification has been lacking. This study installed fiber Bragg grating (FBG) tiltmeters on the bearings of a bridge and monitored the dynamic rotational angle. The dynamic features, including natural frequencies and mode shapes, have been identified successfully. The innovation presented in this paper is the first-time use of FBG tiltmeter readings to identify the natural frequencies of a long-span steel girder bridge. The identified results have been verified using a bridge finite element model. This paper introduces a new method for the dynamic monitoring of a bridge using FBG tiltmeters. Limitations and future research directions are also discussed in the conclusion.

  4. Monitoring Bridge Dynamic Responses Using Fiber Bragg Grating Tiltmeters

    Directory of Open Access Journals (Sweden)

    Feng Xiao

    2017-10-01

    Full Text Available In bridge health monitoring, tiltmeters have been used for measuring rotation and curvature; however, their application in dynamic parameter identification has been lacking. This study installed fiber Bragg grating (FBG tiltmeters on the bearings of a bridge and monitored the dynamic rotational angle. The dynamic features, including natural frequencies and mode shapes, have been identified successfully. The innovation presented in this paper is the first-time use of FBG tiltmeter readings to identify the natural frequencies of a long-span steel girder bridge. The identified results have been verified using a bridge finite element model. This paper introduces a new method for the dynamic monitoring of a bridge using FBG tiltmeters. Limitations and future research directions are also discussed in the conclusion.

  5. Bridge continuous deformation measurement technology based on fiber optic gyro

    Science.gov (United States)

    Gan, Weibing; Hu, Wenbin; Liu, Fang; Tang, Jianguang; Li, Sheng; Yang, Yan

    2016-03-01

    Bridge is an important part of modern transportation systems and deformation is a key index for bridge's safety evaluation. To achieve the long span bridge curve measurement rapidly and timely and accurately locate the bridge maximum deformation, the continuous deformation measurement system (CDMS) based on inertial platform is presented and validated in this paper. Firstly, based on various bridge deformation measurement methods, the method of deformation measurement based on the fiber optic gyro (FOG) is introduced. Secondly, the basic measurement principle based on FOG is presented and the continuous curve trajectory is derived by the formula. Then the measurement accuracy is analyzed in theory and the relevant factors are presented to ensure the measurement accuracy. Finally, the deformation measurement experiments are conducted on a bridge across the Yangtze River. Experimental results show that the presented deformation measurement method is feasible, practical, and reliable; the system can accurately and quickly locate the maximum deformation and has extensive and broad application prospects.

  6. Design, fabrication and erection of Queen Mall Bridge; Queen mall kyo no sekkei seisaku kasetsu

    Energy Technology Data Exchange (ETDEWEB)

    Arai, M.; Ishii, A.; Shinohara, T. [Sumitomo Heavy Industries, Ltd., Tokyo (Japan)

    1997-12-20

    This paper describes design, fabrication and erection of Queen Mall Bridge, which is a new landmark in Minato-Mirai Yokohama. This bridge is two-span continuous cable stayed pedestrian bridge with a roof, and has a length 72.2 m, a width 18 m and a weight about 1,050 t. This bridge connects between the Queen`s Square and the second floor of Pacifico Yokohama. Achieving harmonious impression of the newly designed bridge in this area, glass roof was employed and all-weld method was applied to the in-site jointing of main girders and main tower in addition to the essential structural design. Since all-weld method was applied to the in-site jointing, highly accurate fabrication was considered during the in-site jointing. Due to the heavy traffic of the road below the bridge, the erection time was shortened under the severe erection conditions at night by large block method. Especially, accuracy control was considered for the whole shape management. Pre-assemble of all members was conducted just near the erection site, only 500 m away from the site, to shorten the construction time. 1 ref., 5 figs.

  7. Experimental study on AR fiberglass connectors for bridges made of composite materials

    Directory of Open Access Journals (Sweden)

    Tolosana, N.

    2006-06-01

    Full Text Available One highly relevant aspect in composite material bridgedesing is the study of the shear connectors to be used.Composite material bridges most commonly comprise acomposite deck resting on steel or reinforced concrete girders.This article analyzes the connectors most frequentlyused in such bridges.It also reviews the connectors used in the King StormwaterChannel Bridge, whose fibreglass deck is supported bygirders made of concrete-filled carbon fibre girders.The paper advances proposals for several types of connectorsand discusses the results of push-out test run ona number of prototypes with different geometries.The results are analyzed to identify the optimum model forthe “Autovia del Cantabrico” Overpass, with its 46-m span,carbon fibre girders and AR glass shear connectors.Un aspecto relevante dentro del proyecto de un puenterealizado en materiales compuestos es el estudio de losconectores. El caso mas frecuente de puente en materialescompuestos es aquel que presenta un tablero de materialescompuestos soportado por vigas metalicas o de hormigonarmado. En este trabajo se analizaran los tipos deconectores mas utilizados en este tipo de puentesSe analizaran tambien los conectores utilizados en elKing Stormwater Channel Bridge, donde ademas deltablero en fibra de vidrio, se fabricaron las vigas en fibrasde carbono rellenas de hormigon.En este articulo se propondran varios tipos de conectoresy se presentaran los resultados experimentales correspondientesal ensayo de “push-out” de varios prototipos condiferentes geometrias.Tras evaluar los resultados, se determinara el mas idoneopara su implantacion en el Paso Superior de la Autovia delCantabrico, de 46 metros de luz y que presenta las vigasen fibra de carbono y los conectores de vidrio AR.

  8. Steel framing strategies for highly skewed bridges to reduce/eliminate distortion near skewed supports.

    Science.gov (United States)

    2014-05-01

    Different problems in straight skewed steel I-girder bridges are often associated with the methods used for detailing the cross-frames. Use of theoretical terms to describe these detailing methods and absence of complete and simplified design approac...

  9. Distortional Buckling Analysis of Steel-Concrete Composite Girders in Negative Moment Area

    Directory of Open Access Journals (Sweden)

    Zhou Wangbao

    2014-01-01

    Full Text Available Distortional buckling is one of the most important buckling modes of the steel-concrete composite girder under negative moment. In this study, the equivalent lateral and torsional restraints of the bottom flange of a steel-concrete composite girder under negative moments due to variable axial forces are thoroughly investigated. The results show that there is a coupling effect between the applied forces and the lateral and torsional restraint of the bottom flange. Based on the calculation formula of lateral and torsional restraints, the critical buckling stress of I-steel-concrete composite girders and steel-concrete composite box girders under variable axial force is obtained. The critical bending moment of the steel-concrete composite girders can be further calculated. Compared to the traditional calculation methods of elastic foundation beam, the paper introduces an improved method, which considers coupling effect of the external loads and the foundation spring constraints of the bottom flange. Fifteen examples of the steel-concrete composite girders in different conditions are calculated. The calculation results show a good match between the hand calculation and the ANSYS finite element method, which validated that the analytic calculation method proposed in this paper is practical.

  10. Microstructural characterisation and corrosion performance of old railway girder bridge steel and modern weathering structural steel

    International Nuclear Information System (INIS)

    Tewary, N.K.; Kundu, A.; Nandi, R.; Saha, J.K.; Ghosh, S.K.

    2016-01-01

    Highlights: • Microstructure and corrosion performance are compared for two structural steels. • Microstructure evolution shows primarily ferrite-pearlite in both the steels. • Steels show higher corrosion rate in 1% HCl solution than in 3.5% NaCl solution. • The corrosion products show the presence of oxide, hydroxide and oxy-hydroxides. • The corroded surface reveals morphologies like flowery, cotton balls and rosette. - Abstract: A comparison on microstructure and corrosion performance has been made between the two structural steels used in old railway girder bridge (Sample A) and modern grades of weathering structural steel (Sample B). The microstructures, viewed under optical microscope and scanning electron microscope (SEM), show mainly ferrite-pearlite phase constituents in both the steels, A and B. The phase fraction analysis shows higher amount of pearlite in steel A compared to that of steel B. The grain size of steel A is larger than that of steel B under identical processing condition. The immersion corrosion test in 3.5% NaCl shows that the corrosion rate of steel A increases with time, while the same for steel B decreases with time. On the other hand, corrosion test in 1% HCl shows that the corrosion rate of both steel A and B is higher as compared to that of NaCl which always decreases with time. The XRD analysis of corrosion products show the presence of many oxides, hydroxide and oxy-hydroxide like Lepidocrocite (γ-FeOOH), Goethite (α-FeOOH), Akaganeite (β-FeOOH), Magnetite (Fe_3O_4) and Maghemite (γ-Fe_2O_3) in both the steels. The SEM images of corroded surfaces reveal different morphologies like flowery, cotton balls and rosette etc. which indicate that the corrosion products primarily contain Lepidocrocite (γ-FeOOH), Goethite (α-FeOOH) and Akaganeite (β-FeOOH).

  11. Construction of cable-stayed prestressed concrete bridge, having Japan`s first independent single slanted tower; Nippon hatsu no keisha shuto wo motsu PC shachokyo no seko

    Energy Technology Data Exchange (ETDEWEB)

    Sanada, Y.; Naito, H. [Penta-Ocean Construction Co. Ltd., Tokyo (Japan); Takeuchi, H.; Mikami, T.

    1994-08-01

    In the Hachinoe Harbor, Aomori prefecture, a man-made island (Hachinoe Port Island) is being constructed by reclamation. When proceeding this undertaking plan, a construction of the Hachinoe Harbor Port Island connection bridge, which connects the man-made island with the existing harbor district, was made an urgent necessity. This connecting bridge is a bridge with a total length of 256.56m, and is constituted of two span continuous PC slanted bridge and three span continuous PC box girder bridge. This slanted bridge has become an asymmetrical structure due to several conditions coming from a plan, and moreover it has the first structural shape as a road bridge in Japan, of which main tower is 15{degree} slanted independent single tower type, there are more problems for the work execution compared with other normal slanted bridges. In addition, because it is situated in an extremely cruel environment like in the cold region and in the marine environment, a sufficient consideration is required for its design and work execution in order to insure a durability. In this report, an outline of work execution content about PC slanted bridge part currently under a construction zealously aiming at a completion in the end of the fiscal year 1994 is introduced. 2 refs., 14 figs., 4 tabs.

  12. Numerical/experimental research on welded joints in aluminium truss girders

    NARCIS (Netherlands)

    van Hove, B.W.E.M.; Soetens, F.; Mazzolani, F.M.; Bellucci, F.; Faggiano, B.; Squillace, A.

    2016-01-01

    Welded joints in a 30 meter span aluminium truss girder were investigated numerically and experimentally. Since aluminium design rules for welded K-and N-joints in CHS truss girders were lacking the joints were checked using steel design rules. Calculations showed that the N-joints were governing

  13. Computer modeling of road bridge for simulation moving load

    Directory of Open Access Journals (Sweden)

    Miličić Ilija M.

    2016-01-01

    Full Text Available In this paper is shown computational modelling one span road structures truss bridge with the roadway on the upper belt of. Calculation models were treated as planar and spatial girders made up of 1D finite elements with applications for CAA: Tower and Bridge Designer 2016 (2nd Edition. The conducted computer simulations results are obtained for each comparison of the impact of moving load according to the recommendations of the two standards SRPS and AASHATO. Therefore, it is a variant of the bridge structure modeling application that provides Bridge Designer 2016 (2nd Edition identical modeled in an environment of Tower. As important information for the selection of a computer applications point out that the application Bridge Designer 2016 (2nd Edition we arent unable to treat the impacts moving load model under national standard - V600. .

  14. Behavior of Reinforced Concrete Hybrid Trapezoidal Box Girders Using Ordinary and Highly Strength Concrete

    Directory of Open Access Journals (Sweden)

    Nameer A. Alawsh

    2018-03-01

    Full Text Available In this paper, the general behavior of reinforced concrete hybrid box girders is studied by experimental and numerical investigation. Experimental work is included casting monolithically five specimens of box girders with trapezoidal cross section and testing it as simply supported under two point loading. Two specimens were cast as homogenous box girders (full normal strength concrete (NSC (about 35 MPa and full high strength concrete (HSC (about 55 MPa and three specimens were cast as hybrid box girders (HSC in upper flange only, HSC in upper flange and half depth of webs, and HSC in bottom flange and total depth of webs. Experimental results showed significant effects of concrete hybridization on the structural behavior of box girders specimens such as: cracking loads, cracking patterns, ultimate strengths, and failure modes. The ultimate strength of Hybrid box girders increased by 23% as average when compared with the homogenous box girder (full NSC and decreased by 9% as average when compared with homogenous box girder (full HSC. In numerical investigation, the tested specimens were modeled and analyzed using three dimensional non-linear finite element analysis. The analysis was carried out by using a computer program (ANSYS V16.1. The numerical results showed an acceptable agreement with the experimental work with difference about (3.12% and 9.588% as average for ultimate load and deflection, respectively.

  15. Probability Based Evaluation of Vehicular Bridge Load using Weigh-in-Motion Data

    Directory of Open Access Journals (Sweden)

    Widi Nugraha

    2016-02-01

    Full Text Available Load and Resistance Factored Design (LRFD method for designing bridge in Indonesia have been implemented for more than 25 years. LRFD method treating loads and strengths variables as random variables with specific safety factors for different loads and strengths variables type. The nominal loads, load factors, reduction factors, and other criteria for bridge design code can be determined to meet the reliability criteria. Statistical data of weigh-in-motion (WIM vehicular loads measurement in Northern Java highway, Cikampek - Pamanukan, West Java (2011, used in as statistical loads variable. A 25 m simple span bridge with reinforced concrete T-girder is used as a model for structural analysis due to WIM measured and nominal vehicular load based on RSNI T-02-2005, with applied bending moment of girder as the output. The distribution fitting result of applied bending moment due to WIM measured vehicular loads is lognormal. The maximum bending moment due to RSNI T-02-2005 nominal vehicular load is 842.45 kN-m and has probability of exceedance of 5x10-5. It can be concluded, for this study, that the bridge designed using RSNI T-02-2005 is safely designed, since it has reliability index, β of 5.02, higher than target reliability, β ranging from 3.50 or 3.72.

  16. Evaluation of continuity detail for precast prestressed girders : research project capsule.

    Science.gov (United States)

    2008-03-01

    The construction of a new bridge : crossing the Mississippi River north of : Baton Rouge is currently underway. The : project, named the John James : Audubon Bridge, is a true landmark. Its : main span will be the longest cablestayed : bridge in Nort...

  17. Wind tunnel experiments on unstable self-excited vibration of sectional girders

    Science.gov (United States)

    Král, Radomil; Pospíšil, Stanislav; Náprstek, Jiří

    2014-01-01

    In this paper, a wind tunnel analysis of two degrees-of-freedom system represented by sectional girders is carried out. Besides an evaluation of the aeroelastic coefficients, the analysis is focused on the influence of the natural frequency ratio on the initiation of unstable vibration, which can be of practical interest. On the phenomenological level, the paper also discusses experimentally ascertained response regimes, with an emphasis on their stability character. The attention is paid to the memory effect in the response described by the hysteresis loop together with the separation curves determining the stability boundaries. The influence of initial disturbance on the stability is examined. Two types of cross-sections were investigated: (i) rectangular one with the aspect ratio 1:5, and (ii) bridge-like cross-section with comparable principal dimensions. For both types of cross-sections, the limits of the stability are significantly affected by an intentionally introduced initial disturbance. This holds especially with regard to the rectangular profile where the separation curves create very narrow sub-domains between a stable and an unstable response, while the bridge-like cross-section demonstrates much stable behaviour.

  18. Experimental Analysis of Stiffness of the Riveted Steel Railway Bridge Deck Members’ Joints

    Directory of Open Access Journals (Sweden)

    Gocál Jozef

    2014-12-01

    Full Text Available The paper deals with the real behaviour of the riveted steel railway bridge deck members’ connections with respect to their bending stiffness. Attention is paid to the stringer-to-cross beam connection as well as the cross beam-to-main girder connection. The stiffness of the two connections is investigated on the basis of evaluation of the experimentally determined stress response of the observed structural members to the actual traffic load on an existing railway bridge.

  19. Investigation of Ultimate Strength of Composite Open-Web Joist-Girders

    OpenAIRE

    Showalter, Sheldon Lee

    1999-01-01

    The goal of this research was to study several methods of generating composite action using open-web joist-girders, designed and manufactured by Nucor Corporation. In addition to comparing the relative performance of these systems, it was intended to determine whether the current accepted design procedure for composite joists could be extended to joist-girders.

  20. Wireless Smart Sensor Network System Using SmartBridge Sensor Nodes for Structural Health Monitoring of Existing Concrete Bridges

    Science.gov (United States)

    Gaviña, J. R.; Uy, F. A.; Carreon, J. D.

    2017-06-01

    There are over 8000 bridges in the Philippines today according to the Department of Public Works and Highways (DPWH). Currently, visual inspection is the most common practice in monitoring the structural integrity of bridges. However, visual inspections have proven to be insufficient in determining the actual health or condition of a bridge. Structural Health Monitoring (SHM) aims to give, in real-time, a diagnosis of the actual condition of the bridge. In this study, SmartBridge Sensor Nodes were installed on an existing concrete bridge with American Association of State Highway and Transportation Officials (AASHTO) Type IV Girders to gather vibration of the elements of the bridge. Also, standards on the effective installation of SmartBridge Sensor Nodes, such as location and orientation was determined. Acceleration readings from the sensor were then uploaded to a server, wherein they are monitored against certain thresholds, from which, the health of the bridge will be derived. Final output will be a portal or webpage wherein the information, health, and acceleration readings of the bridge will be available for viewing. With levels of access set for different types of users, the main users will have access to download data and reports. Data transmission and webpage access are available online, making the SHM system wireless.

  1. Skewed steel bridges, part ii : cross-frame and connection design to ensure brace effectiveness : technical summary.

    Science.gov (United States)

    2017-08-01

    Skewed bridges in Kansas are often designed such that the cross-frames are carried parallel to the skew angle up to 40, while many other states place cross-frames perpendicular to the girder for skew angles greater than 20. Skewed-parallel cross-...

  2. Skewed steel bridges, part ii : cross-frame and connection design to ensure brace effectiveness : final report.

    Science.gov (United States)

    2017-08-01

    Skewed bridges in Kansas are often designed such that the cross-frames are carried parallel to the skew angle up to 40, while many other states place cross-frames perpendicular to the girder for skew angles greater than 20. Skewed-parallel cross-...

  3. A Finite Segment Method for Skewed Box Girder Analysis

    Directory of Open Access Journals (Sweden)

    Xingwei Xue

    2018-01-01

    Full Text Available A finite segment method is presented to analyze the mechanical behavior of skewed box girders. By modeling the top and bottom plates of the segments with skew plate beam element under an inclined coordinate system and the webs with normal plate beam element, a spatial elastic displacement model for skewed box girder is constructed, which can satisfy the compatibility condition at the corners of the cross section for box girders. The formulation of the finite segment is developed based on the variational principle. The major advantage of the proposed approach, in comparison with the finite element method, is that it can simplify a three-dimensional structure into a one-dimensional structure for structural analysis, which results in significant saving in computational times. At last, the accuracy and efficiency of the proposed finite segment method are verified by a model test.

  4. Flexible concrete link slabs used as expansion joints in bridge decks

    DEFF Research Database (Denmark)

    Lárusson, Lárus Helgi; Fischer, Gregor

    2011-01-01

    of water through the expansion joint and subsequent corrosion of girders and girder bearings. Investigations on joint-less superstructures using conventional steel reinforcement in so-called concrete link slabs indicate improved performance and economic feasibility. However, this concept requires...... relatively large amounts of steel reinforcement for crack control purposes and consequently provides a relatively large flexural stiffness and negative moment capacity at the joint between the spans. These contradicting requirements and effects in existing replacement concepts for damaged mechanical bridge...... joints are currently unresolved. In the proposed system described in this paper, a ductile cement-based composite section reinforced with Glass Fiber Reinforced Polymers (GFRP) replaces the damaged expansion joint. The combination of this ductile concrete together with corrosion resistant GFRP...

  5. Practical cable tension adjustment based upon the satisfaction concept of bridge designers; Sekkeisha no manzokudo wo koryo shita fuzzy cable choryoku choseiho

    Energy Technology Data Exchange (ETDEWEB)

    Kaneyoshi, M.; Tanaka, H. [Hitachi Zosen, Tokyo (Japan)] Furuta, H. [Kansai Univ., Osaka (Japan)

    1998-07-21

    Cable tension adjustment of bridge beam of cable stayed bridge and so forth that uses cable as a structural element is classified into (1) pre-stress adjustment of cable at design level, (2) slim adjustment required at erection level. The former deals with the structurally high dimensional statically indeterminate structures like cable-stayed bridges and is a process for carrying out economical design by making the stress resultant of main girder small due to the introduction of appropriate pre-stress stress on this cable. The later is the process of getting rid off the errors caused in cable tension and camber of girder and tower regarding various errors such as design, fabrication and erection errors. The authors developed analysis method using fuzzy regression analysis and this has been applied in number of practical bridges. In this research, much more practical method is developed where the aspire of designer can be introduced easily by applying the satisfaction concept. By using this, pre-stress adjustment and shim adjustment of cable can be possible in a practical way. 9 refs., 7 figs., 8 tabs.

  6. Steel bridges structural health monitoring based on operational modal analysis accommodating evaluation of uncertainty

    Directory of Open Access Journals (Sweden)

    Saeid Jahan

    2017-11-01

    Full Text Available Structural damage detection is based on that the dynamic response of structure will change because of damage. Hence, it is possible to estimate the location and severity of damage leads to changes in the dynamic response before and after the damage. In this study, the genetic fuzzy system has been used for bridge structural health monitoring. A key objective of using genetic algorithms is to automate the design of fuzzy systems. This method is used for damage detection of a single span railway bridge with steel girders and a concrete bridge. For studying damage detection, the numerical models of these two bridges are built with the measured dynamic characteristics. A three-dimensional finite element model and a single two-dimensional girders model of the bridge have been constructed to study usefulness of the genetic fuzzy system for damage detection and the effectiveness of modeling. After analysis to control the uncertainties, the measured frequencies are contaminated with some noise and the effect of that on the achievement of damage detection method is evaluated. The present study has shown that the natural frequency has appropriate sensitivity to different damage scenarios in the structure. In addition, the natural frequency in comparison with other modal parameters, is less affected by random noise. Increasing the number of measurement modes and using torsional modes, will lead to an accurate damage diagnosis even in symmetrical structures.

  7. Exciting test of a floating type cable stayed bridge and its response observation under the typhoon; Furotiingu keishiki shachokyo (Utagenkabashi) no kishinki shiken to taifuji oto kansoku

    Energy Technology Data Exchange (ETDEWEB)

    Uno, K. [Kyushu Kyoritsu Univ., Kitakyushu (Japan). Faculty of Engineering; Aso, T. [Yamaguchi Univ., Ube (Japan). Faculty of Engineering; Kitagawa, S. [Kyushu International Univ., Kitakyushu (Japan). Faculty of Economy; Kabashima, S.

    1995-09-20

    Recently, in case of the planning and designing of bridges, of course its practicality and execution stability are considered, but consideration for landscape also is a large problem. In particular, the selection of the bridge type is very important in order to protect the beautiful natural landscape. The cable stayed bridge has become to be executed often, owing to its elegant style, however, it becomes important theme clarify the antiseismic and wind stability because of its complicated structure system and very slender girder. In this paper, the results of the dynamic characteristics of a floating type cable stayed bridge (length 292.1 m and width 14.9 m) and the observation of its dynamic behavior under the typhoon are reported. Microtremor measurement was performed to determine the dynamic characteristics of the bridge under construction. After the construction of the bridge, the excitation test was carried out in order to confirm its natural frequencies, vibration modes and damping constants. From the results of the observation of the dynamic behavior of the girder and cables under the typhoon, the wind stability of this bridge was confirmed. 10 refs., 13 figs., 9 tabs.

  8. Nondestructive Evaluation of Railway Bridge by System Identification Using Field Vibration Measurement

    International Nuclear Information System (INIS)

    Ho, Duc Duy; Hong, Dong Soo; Kim, Jeong Tae

    2010-01-01

    This paper presents a nondestructive evaluation approach for system identification (SID) of real railway bridges using field vibration test results. First, a multi-phase SID scheme designed on the basis of eigenvalue sensitivity concept is presented. Next, the proposed multi-phase approach is evaluated from field vibration tests on a real railway bridge (Wondongcheon bridge) located in Yangsan, Korea. On the steel girder bridge, a few natural frequencies and mode shapes are experimentally measured under the ambient vibration condition. The corresponding modal parameters are numerically calculated from a three-dimensional finite element (FE) model established for the target bridge. Eigenvalue sensitivities are analyzed for potential model-updating parameters of the FE model. Then, structural subsystems are identified phase-by-phase using the proposed model-updating procedure. Based on model-updating results, a baseline model and a nondestructive evaluation of test bridge are identified

  9. Sadhana | Indian Academy of Sciences

    Indian Academy of Sciences (India)

    Bridges are one of the most crucial facilities of transportation networks. Therefore, evaluation of the seismic vulnerability of bridge structures is perpetually regarded topic for researchers. In this study, we developed seismic fragility curves for a continuous steel box girder bridge considering the effect of differentlevels of ...

  10. Strength Enhancement of Prestressed Concrete Dapped-End Girders

    Directory of Open Access Journals (Sweden)

    Shatha Dhia Mohammed

    2015-10-01

    Full Text Available This paper presents the application of nonlinear finite element models in the analysis of dapped-ends pre-stressed reinforced concrete girders under static loading by using ANSYS software. The girder dimensions are (4.90 m span, 0.40 m depth, 0.20 m width, 0.20 m nib depth, and 0.10 m nib length and the parameters considered in this research are the pre-stress effect, and strand profile (straight and draped. The numerical results are compared with the experimental results of the same girders. The comparisons are carried out in terms of initial prestress effect, load- deflection curve, and failure load. Good agreement was obtained between the analytical and experimental results. Even that, the numerical model was stiffer than the experimental, but; there were a good agreements in both trends and values. The difference varies in the range (5-12% for the deflection. Results have shown that the pre-stress force has increased the static ultimate load capacity by (35% in case of straight strand and by (97% in case of draped strand

  11. Evaluation of High-Speed Railway Bridges Based on a Nondestructive Monitoring System

    Directory of Open Access Journals (Sweden)

    Mosbeh R. Kaloop

    2016-01-01

    Full Text Available Recently, trains’ velocities in Korea increased more than the speed used in the design of some bridges. Accordingly, this paper demonstrates the evaluation of a railway bridge due to high-speed trains’ movement. A nondestructive monitoring system is used to assess the bridge performance under train speeds of 290, 360, 400 and 406 km/h. This system is comprised of a wireless short-term acceleration system and strain monitoring sensors attached to the bridge girder. The results of the analytical methods in time and frequency domains are presented. The following conclusions are obtained: the cross-correlation models for accelerations and strain measurements are effective to predict the performance of the bridge; the static behavior is increased with train speed developments; and the vibration, torsion, fatigue and frequency contents analyses of the bridge show that the bridge is safe under applied trains’ speeds.

  12. Hybrid Bridge Structures Made of Frp Composite and Concrete

    Science.gov (United States)

    Rajchel, Mateusz; Siwowski, Tomasz

    2017-09-01

    Despite many advantages over the conventional construction materials, the contemporary development of FRP composites in bridge engineering is limited due to high initial cost, low stiffness (in case of glass fibers) and sudden composite failure mode. In order to reduce the given limitations, mixed (hybrid) solutions connecting the FRP composites and conventional construction materials, including concrete, have been tested in many countries for 20 years. Shaping the hybrid structures based on the attributes of particular materials, aims to increase stiffness and reduce cost without losing the carrying capacity, lightness and easiness of bridges that includes such hybrid girders, and to avoid the sudden dangerous failure mode. In the following article, the authors described examples of hybrid road bridges made of FRP composite and concrete within the time of 20 years and presented the first Polish hybrid FRP-concrete road bridge. Also, the directions of further research, necessary to spread these innovative, advanced and sustainable bridge structures were indicated.

  13. APPLICATION OF ULTRA-HIGH PERFORMANCE CONCRETE TO PEDESTRIAN CABLE-STAYED BRIDGES

    Directory of Open Access Journals (Sweden)

    CHI-DONG LEE

    2013-06-01

    Full Text Available The use of ultra-high performance concrete (UHPC, which enables reducing the cross sectional dimension of the structures due to its high strength, is expected in the construction of the super-long span bridges. Unlike conventional concrete, UHPC experiences less variation of material properties such as creep and drying shrinkage and can reduce uncertainties in predicting time-dependent behavior over the long term. This study describes UHPC’s material characteristics and benefits when applied to super-long span bridges. A UHPC girder pedestrian cable-stayed bridge was designed and successfully constructed. The UHPC reduced the deflections in both the short and long term. The cost analysis demonstrates a highly competitive price for UHPC. This study indicates that UHPC has a strong potential for application in the super-long span bridges.

  14. Construction simulation analysis of 120m continuous rigid frame bridge based on Midas Civil

    Science.gov (United States)

    Shi, Jing-xian; Ran, Zhi-hong

    2018-03-01

    In this paper, a three-dimensional finite element model of a continuous rigid frame bridge with a main span of 120m is established by the simulation and analysis of Midas Civil software. The deflection and stress of the main beam in each construction stage of continuous beam bridge are simulated and analyzed, which provides a reliable technical guarantee for the safe construction of the bridge.

  15. Acoustic emission techniques applied to conventionally reinforced concrete bridge girders.

    Science.gov (United States)

    2008-09-01

    Reinforced concrete (RC) bridges generally operate at service-level loads except during discrete overload events that can reduce the integrity of the structure by initiating concrete cracks, widening or extending of existing concrete cracks, as well ...

  16. Determination of in-situ strength on selected bridge element concrete girder and slab of Nagtahan bridge using rebound hammer test

    International Nuclear Information System (INIS)

    Uy, Bernadette Betsy B.; Banaga, Renato T.

    2013-01-01

    This study examined the extent of the damage due to fire on the affected areas of the bridge structure. The need to assess the damage of the Nagtahan Bridge is very useful to provide appropriate measures in the repair or in the reinforcement of the bridge, hence will ensure its strength and integrity. The study included two (2) spans of the bridge deck/slab with specific locations of the bridge that were subjected for testing. The Rebound Hammer was used as a preliminary test in evaluating the bridge condition. Its capability is to assess the in-place uniformity of concrete, to delineate regions in a structure of poor quality or deteriorated concrete, and to estimate the in-place strength; and ultimately, for relative comparison between the different structures of the bridge. With the use of the NDT Rebound Hammer Test, the researchers were able to determine whether or not the in-situ strength of the bridge's concrete has been weakened due to fire. The DPW-Standard Specification is the government acceptable manual, containing the acceptance criteria, used as the basis for standard construction procedures in the department.(author)

  17. INVESTIGATION OF LAUNCHING PROCESS FOR STEEL REINFORCED CONCRETE FRAMEWORK OF LARGE BRIDGES

    Directory of Open Access Journals (Sweden)

    V. A. Grechukhin

    2017-01-01

    Full Text Available Bridges are considered as the most complicated, labour-consuming and expensive components in roadway network of the Republic of Belarus. So their construction and operation are to be carried out at high technological level. One of the modern industrial methods is a cyclic longitudinal launching of large frameworks which provide the possibility to reject usage of expensive auxiliary facilities and reduce a construction period. There are several variants of longitudinal launching according to shipping conditions and span length: without launching girder, with launching girder, with top strut-framed beam in the form of cable-stayed system, with strut-framed beam located under span. While using method for the cyclic longitudinal launching manufacturing process of span is concentrated on the shore. The main task of the investigations is to select economic, quick and technologically simple type of the cyclic longitudinal launching with minimum resource- and labour inputs. Span launching has been comparatively analyzed with temporary supports being specially constructed within the span and according to capital supports with the help of launching girder. Conclusions made on the basis of calculations for constructive elements of span according to bearing ability of element sections during launching and also during the process of reinforced concrete plate grouting and at the stage of operation have shown that span assembly with application of temporary supports does not reduce steel spread in comparison with the variant excluding them. Results of the conducted investigations have been approbated in cooperation with state enterprise “Belgiprodor” while designing a bridge across river Sozh.

  18. Erection of the Meiko-Central bridge; Meiko chuo ohashi no kasetsu

    Energy Technology Data Exchange (ETDEWEB)

    Kaneda, S.; Nishikawa, K.; Nagai, Y.; Ishihara, S.; Tsunekawa, M.; Yoshino, S. [Kawasaki Heavy Industries, Ltd., Kobe (Japan)

    1997-10-20

    This is a 1170m-long triple-span continuous steel cable-stayed bridge with the central span measuring 590m, built to traverse Nagoya Port as part of the Isewangan highway. The 190m-high main towers are A-shaped, and have an octagonal cross section to stay stable against winds. The joints were designed to be welded mainly on the spot so as not to affect the surrounding landscape, and in this welding process the achievement of prescribed accuracy was the important technological task. The main girder was a 37m-wide multi-chamber/single-box type, and the steel stabs were installed by on-site welding. Since the erection was carried out above the ship course, a method was used in which the main girder was hung over with the cable stretched long, which demanded constant prudence to assure accuracy throughout the work. The cable is a 17-stage 2-face multi-fan type, a semi-parallel wire strand coated with polyethylene and white fluoroethylene resin. As for accuracy management for erection, it was accomplished by adjusting the amount of shim introduced into each of the four cables every time one stage of cable was erected for the side span and central span. Every accuracy management requirement met the target value with an adequate margin. 6 refs., 10 figs., 4 tabs.

  19. Analysis on Adhesively-Bonded Joints of FRP-steel Composite Bridge under Combined Loading : Arcan Test Study and Numerical Modeling

    NARCIS (Netherlands)

    Jiang, X.; Qiang, X.; Kolstein, M.H.; Bijlaard, F.S.K.

    2016-01-01

    The research presented in this paper is an experimental study and numerical analysis on mechanical behavior of the adhesively-bonded joint between FRP sandwich bridge deck and steel girder. Generally, there are three typical stress states in the adhesively-bonded joint: shear stress, tensile stress,

  20. Nuevo puente para el oleoducto de Europa Central

    Directory of Open Access Journals (Sweden)

    Giuliani, G.

    1971-04-01

    Full Text Available This bridge runs over the Po river, near Pavia, and is 1,370 m long. It is divided into spans of 36 m length each. The horizontal structure of the bridge consists of sets of four continuous girders, running over six spans, and two continuous girders, extending over seven spans. The piles are 14 m high and 1.50 m in diameter, and rest on the extension of the foundation piles. This article describes details of the project and the system of placing the continuous girders.Este puente, construido sobre el río Po, cerca de Pavía, tiene una longitud total de 1.370 m, dividida en tramos de 36 m de longitud, salvados por cuatro vigas continuas, de 6 vanos, y dos vigas continuas, de 7 vanos. Las pilas, de 14 m de altura y 1,50 m de diámetro, se han construido sobre la prolongación de los pilotes de cimientos. El artículo explica las particularidades de la obra y el procedimiento de lanzamiento adoptado.

  1. Seismic Vulnerability Evaluation of a Three-Span Continuous Beam Railway Bridge

    Directory of Open Access Journals (Sweden)

    Chongwen Jiang

    2017-01-01

    Full Text Available In order to evaluate the seismic vulnerability of a railway bridge, a nonlinear finite element model of typical three-span continuous beam bridge on the Sichuan-Tibet railway in China was built. It further aimed at performing a probabilistic seismic demand analysis based on the seismic performance of the above-mentioned bridge. Firstly, the uncertainties of bridge parameters were analyzed while a set of finite element model samples were formulated with Latin hypercube sampling method. Secondly, under Wenchuan earthquake ground motions, an incremental dynamic method (IDA analysis was performed, and the seismic peak responses of bridge components were recorded. Thirdly, the probabilistic seismic demand model for the bridge principal components under the prerequisite of two different kinds of bearing, with and without seismic isolation, was generated. Finally, comparison was drawn to further ascertain the effect of two different kinds of bearings on the fragility components. Based on the reliability theory, results were presented concerning the seismic fragility curves.

  2. Design of pedestrian truss bridge with Sengon-Rubber laminated veneer lumber

    Science.gov (United States)

    Herbudiman, B.; Pranata, Y. A.; Pangestu, L.

    2017-12-01

    Timber bridges are one of the bridge that has long been used, but nowadays, large dimension of sawn timber has limited supply and also it is not environmental-friendly. Laminated veneer lumber (LVL) is a engineered wood that becomes one of the promising alternative, because it is made from lower quality wood that processed to be used as a more quality one. The bridge planned to be a pedestrian truss bridge with length of 9 m, width of 3 m, height of 2.5 m, and using bolt and steel plate as its connection system. Mechanical properties of LVL obtained directly from laboratory test result. Bridge modeling and planning for wood construction refers to SNI 7973:2013, while the loading refers to SNI 1725:2016. Based on the modelling and calculation, the dimension of truss frame and girder beam which are 9 cm x 9 cm and 9 cm x 18 cm have adequate strengths and satisfy deflection requirement.

  3. Design and Construction of Operation Bridge for Research Reactor

    International Nuclear Information System (INIS)

    Jung, Kwangsub; Choi, Jinbok; Lee, Jongmin; Oh, Jinho

    2015-01-01

    The operation bridge contains a lower working deck mounted on a saddle that travels on rails. Upright members are mounted on the saddle to support the upper structure and two hoist monorails. The saddle contains an anti-derail system that is composed of seismic lugs and guide rollers. The operation bridge travels along the rails to transport the fuel assembly, irradiated object, and reactor components in the pools by using tools. Hoists are installed at the top girder. The hoist is suspended from the monorail by means of a motor driven trolley that runs along the monorail. Movements of hoist and trolley are controlled by using the control pendant switch. Processes of design and construction of the operation bridge for the research reactor are introduced. The operation bridge is designed under consideration of functions of handling equipment in the pool and operational limits for safety. Structural analysis is carried out to evaluate the structural integrity in the seismic events. Tests and inspections are also performed during fabrication and installation to confirm the function and safety of the operation bridge

  4. Study and application of micrometric alignment on the prototype girders of the CLIC Two-Beam Module

    CERN Document Server

    Gazis, Nikolaos; Mainaud-Durand, Hélène; Samochkine, Alexandre; Anastasopoulos, Michail

    2011-01-01

    The Compact LInear Collider (CLIC), currently under study at CERN, aims at the development of a Multi-TeV e+ e- collider. The micro-precision CLIC RF-structures will have an accelerating gradient of 100 MV/m and will be mounted and aligned on specially developed supporting girders. The girder fabrication constraints are dictated by stringent physics requirements. The micrometric pre-alignment over several kilometers of girders, allow for the CLIC structures to fulfill their acceleration and collision functionality. Study of such girders and their sophisticated alignment method, is a challenging case involving dedicated mechanical design as well as prototype production and experimental testing.

  5. Vertical vibration control system for PC cable-stayed bridge during cantilever construction; Shuketa jogedo seishin sochi ni yoru haridashi sekoji no PC shachokyo no seishin

    Energy Technology Data Exchange (ETDEWEB)

    Oshio, M.; Nakano, R.; Niihara, Y.; Yano, K.; Takeda, T. [Kajima Corp., Tokyo (Japan)

    1995-12-20

    A PC cable-stayed bridge under extension construction having long span length may have long-cycle vibration generated because of wind. The vibration puts workers working on main girders into a state of seasick causing the workability to drop. Therefore, with an objective to reduce vibration occurring on the main girders during construction, discussions were given on application of an active type vertical vibration absorbing device. The vibration absorbing device is an active system that a weight is driven vertically by a hydraulic actuator. The device was developed with a target that damping ratio when a maximum extension is 120 m becomes three times that when no vibration is absorbed for a 5-span continuous PC cable-stayed bridge with a length of 675 m, a central span of 260 m, and a width of 11 m. A cage housing the weight is connected with the actuator at its top by using pins, and the weight is supported being suspended from the top of the actuator. Vibration is absorbed by utilizing reactive force generated when the weight is driven vertically by the hydraulic actuator. The hydraulic actuator contains a gas spring that supports the dead weight of the weight. Experiments have verified the effectiveness of the vertical vibration absorbing device. 4 refs., 12 figs., 3 tabs.

  6. Monitoring calculation of closure change of Extradosed Cable-stayed Bridge

    Science.gov (United States)

    Shi, Jing Xian; Ran, Zhi Hong

    2018-06-01

    During the construction of extradosed cable-stayed bridge in Yunnan province, China, the construction unit has made certain changes in the construction process of the closure section due to environmental restrictions: remove the hanging basket after the closure, the sling shall not be provided in closure section, the function of the sling is realized by the hanging basket on the 16th beam. In case of this change, the bridge has been constructed to section 15th. In order to ensure the smooth and orderly progress of each stage in the closure phase, this article is arranged according to the construction plan, appropriate adjustment of related procedures, checking the bridge safety at all stages of construction, the stress and force of the main girder are compared to ensure the safety of the construction after closure changes. Adjust the height of the beam of the 16th and 17th to adapt the new construction plan, and the bridge closure smoothly.

  7. Design proposal for ultimate shear strength of tapered steel plate girders

    Directory of Open Access Journals (Sweden)

    A. Bedynek

    2017-03-01

    Full Text Available Numerous experimental and numerical studies on prismatic plate girders subjected to shear can be found in the literature. However, the real structures are frequently designed as non-uniform structural elements. The main objective of the research is the development of a new proposal for the calculation of the ultimate shear resistance of tapered steel plate girders taking into account the specific behaviour of such members. A new mechanical model is presented in the paper and it is used to show the differences between the behaviour of uniform and tapered web panels subjected to shear. EN 1993-1-5 design specifications for the determination of the shear strength for rectangular plates are improved in order to assess the shear strength of tapered elements. Numerical studies carried out on tapered steel plate girders subjected to shear lead to confirm the suitability of the mechanical model and the proposed design expression.

  8. Committee VI.1. Extreme Hull Girder Loading

    DEFF Research Database (Denmark)

    Jensen, Jørgen Juncher

    2000-01-01

    Committee Mandate. Evaluate and develop direct calculation procedures for extreme wawe loads on ship hull girders. Due consideration shall be given to stochastic and non-linear effects. The procedures shall be assessed by comparison with in-service experiences, model tests and more refined...

  9. Fatigue strength of field welded joints in I-section girders of thick flange plates with cope hole details; Sukarappu wo yusuru atsuita I gata danmen keta genba yosetsu tsugitebu no hiro kyodo

    Energy Technology Data Exchange (ETDEWEB)

    Minami, K.; Miki, C.; Tateishi, K. [Tokyo Institute of Technology, Tokyo (Japan)

    1997-10-15

    Field welding an I-section girder forms details having scallop at the web, whereas the presence of the scallop causes shear deformation and localized stress concentration. Therefore the details in joints with low fatigue strength are ranked as class G in the fatigue design guideline published by JSSC. With special notice on the effect of shear, the present study has varied the phase by using multiple number of jacks; so loaded that the direction of the shear force will change; assumed field welding of a bridge constructed with a few number of main girders; and verified fatigue strength at thick flange plates. In addition, in order to improve the fatigue strength, elucidation was given on the effect of grinder finish at boxing welds. From these results, items to be considered were made clear when structural details are designed and fabricated, in which I-section girders having scallop are welded in fields. Furthermore, it was considered that stress in web plate jointing welding bead becomes relatively higher than local stress in boxing, which was indicated as a point requiring precaution. 8 refs., 20 figs., 2 tabs.

  10. FINITE ELEMENT ANALYSIS OF TAPERED COMPOSITE PLATE GIRDER WITH A NON-LINEAR VARYING WEB DEPTH

    Directory of Open Access Journals (Sweden)

    Q. A. HASAN

    2017-11-01

    Full Text Available The paper presents Finite Element Analysis to determine the ultimate shear capacity of tapered composite plate girder. The effect of degree of taper on the ultimate shear capacity of tapered steel-concrete composite plate girder with a nonlinear varying web depth, effect of slenderness ratio on the ultimate shear capacity, and effect of flange stiffness on the ductility were considered as the parametric studies. Effect of concrete slab on the ultimate shear capacity of tapered plate girders was also considered and it was found to be so effective on the ultimate shear capacity of the tapered plate girder compared with the steel one. The accuracy of the finite element method is established by comparing the finite element with the results existing in the literature. The study was conducted using nonlinear finite element modelling with computer software LUSAS 14.7.

  11. Seismic vulnerability assessment of a continuous steel box girder ...

    Indian Academy of Sciences (India)

    Tae-Hyung Lee

    2018-02-07

    Feb 7, 2018 ... nonlinear time history analysis is the most widely used and the most reliable method ... the damage probability for the non-isolated bridge is larger than those of the isolated .... [17] and are adjusted for a simulated facilitation purpose. ..... function is assumed as a log-normal cumulative distribution function ...

  12. Vehicle Signal Analysis Using Artificial Neural Networks for a Bridge Weigh-in-Motion System

    Directory of Open Access Journals (Sweden)

    Min-Seok Park

    2009-10-01

    Full Text Available This paper describes the procedures for development of signal analysis algorithms using artificial neural networks for Bridge Weigh-in-Motion (B-WIM systems. Through the analysis procedure, the extraction of information concerning heavy traffic vehicles such as weight, speed, and number of axles from the time domain strain data of the B-WIM system was attempted. As one of the several possible pattern recognition techniques, an Artificial Neural Network (ANN was employed since it could effectively include dynamic effects and bridge-vehicle interactions. A number of vehicle traveling experiments with sufficient load cases were executed on two different types of bridges, a simply supported pre-stressed concrete girder bridge and a cable-stayed bridge. Different types of WIM systems such as high-speed WIM or low-speed WIM were also utilized during the experiments for cross-checking and to validate the performance of the developed algorithms.

  13. Vehicle Signal Analysis Using Artificial Neural Networks for a Bridge Weigh-in-Motion System.

    Science.gov (United States)

    Kim, Sungkon; Lee, Jungwhee; Park, Min-Seok; Jo, Byung-Wan

    2009-01-01

    This paper describes the procedures for development of signal analysis algorithms using artificial neural networks for Bridge Weigh-in-Motion (B-WIM) systems. Through the analysis procedure, the extraction of information concerning heavy traffic vehicles such as weight, speed, and number of axles from the time domain strain data of the B-WIM system was attempted. As one of the several possible pattern recognition techniques, an Artificial Neural Network (ANN) was employed since it could effectively include dynamic effects and bridge-vehicle interactions. A number of vehicle traveling experiments with sufficient load cases were executed on two different types of bridges, a simply supported pre-stressed concrete girder bridge and a cable-stayed bridge. Different types of WIM systems such as high-speed WIM or low-speed WIM were also utilized during the experiments for cross-checking and to validate the performance of the developed algorithms.

  14. Energy-based damping evaluation of cable-stayed bridges and its application to Tsurumi Tsubasa bridge; Shachokyo shindo gensui no energy teki hyokaho to Tsurumi Tsubasakyo eno tekiyo

    Energy Technology Data Exchange (ETDEWEB)

    Yamaguchi, H. [Saitama University, Saitama (Japan). Faculty of Engineering; Takano, H.; Ogasawara, M.; Shimosato, T. [Metropolitan Expressway Public Corp., Tokyo (Japan); Kato, M.; Kato, H. [NKK Corp., Tokyo (Japan)

    1996-07-21

    This paper provides and discusses a more common energy-based evaluation method of vibration damping in cable-stayed bridges. This method was applied to data obtained from the field vibration test of the Tsurumi Tsubasa Bridge. The damping was defined as dissipation energy in one cycle against the total potential energy. The dissipation energy from shoe friction, aerodynamic damping, and dampers for cables was added to the method proposed by Yamaguchi, et. al., in which the energy of girders, towers, and cables were quantitated, and the dissipation energy was determined from the loss factor of each constituent, to evaluate the damping of whole bridge. Thus, a more common energy-based evaluation method was provided. This method was applied to the damping obtained from the field vibration test of Tsurumi Tsubasa Bridge. Consequently, it was found that the damping of whole bridge was significantly affected by the shoe friction, aerodynamic damping, and dampers for cables. Distinguished damping characteristics of the Tsurumi Tsubasa Bridge could be explained by the energy-based evaluation. Validity of the energy-based evaluation method for damping of cable-stayed bridges was demonstrated. 15 refs., 9 figs., 6 tabs.

  15. On the Influence of Hull Girder Flexibility on the Wave

    DEFF Research Database (Denmark)

    Seng, Sopheak; Andersen, Ingrid Marie Vincent; Jensen, Jørgen Juncher

    2012-01-01

    Numerical predictions and model test results of the wave induced bending moments in a 9,400 TEU post-Panamax container vessel are presented for two regular wave scenarios. Different numerical procedures have been applied: a linear and non-linear time-domain strip theory and a direct calculation (...... (CFD) solving the Navier-Stokes equations with the free surface captured by a volume-of-fluid (VOF) method. In all procedures the flexibility of the hull girder is modelled as a non-uniform Timoshenko beam. It is observed that the non-linear models agree well with the model tests...... and as there is no occurrence of severe slamming in the cases considered, the inexpensive non-linear strip theory is as accurate as the direct CFD calculation method. In a comparison with the results using the rigid body assumption, the increase in the vertical bending moment (VBM) amidships due to the flexibility of the hull...... girder is found to be approximately 7% (peak-to-peak amplitude) in general. The non-linear responses, however, contain over-harmonic frequencies which may coincide with the natural frequency of the two-node vertical bending mode inducing resonance. In that case the hull girder flexibility causes...

  16. Development of a smart timber bridge girder with fiber optic sensors

    Science.gov (United States)

    James Wacker; Ursula Deza; Brent M. Phares; Terry J. Wipf

    2010-01-01

    Past timber bridge evaluation and maintenance efforts in the USA have principally focused on the internal integrity of timber components using various non-destructive evaluation tools to supplement visual inspection data. This project is part of a comprehensive effort to develop smart structure concepts for improving the long-term performance, maintenance, and...

  17. Assessment of the transportation route of oversize and excessive loads in relation to the load-bearing capacity of existing bridges

    Science.gov (United States)

    Doležel, Jiří; Novák, Drahomír; Petrů, Jan

    2017-09-01

    Transportation routes of oversize and excessive loads are currently planned in relation to ensure the transit of a vehicle through critical points on the road. Critical points are level-intersection of roads, bridges etc. This article presents a comprehensive procedure to determine a reliability and a load-bearing capacity level of the existing bridges on highways and roads using the advanced methods of reliability analysis based on simulation techniques of Monte Carlo type in combination with nonlinear finite element method analysis. The safety index is considered as a main criterion of the reliability level of the existing construction structures and the index is described in current structural design standards, e.g. ISO and Eurocode. An example of a single-span slab bridge made of precast prestressed concrete girders of the 60 year current time and its load bearing capacity is set for the ultimate limit state and serviceability limit state. The structure’s design load capacity was estimated by the full probability nonlinear MKP analysis using a simulation technique Latin Hypercube Sampling (LHS). Load-bearing capacity values based on a fully probabilistic analysis are compared with the load-bearing capacity levels which were estimated by deterministic methods of a critical section of the most loaded girders.

  18. A new multiconstraint method for determining the optimal cable stresses in cable-stayed bridges.

    Science.gov (United States)

    Asgari, B; Osman, S A; Adnan, A

    2014-01-01

    Cable-stayed bridges are one of the most popular types of long-span bridges. The structural behaviour of cable-stayed bridges is sensitive to the load distribution between the girder, pylons, and cables. The determination of pretensioning cable stresses is critical in the cable-stayed bridge design procedure. By finding the optimum stresses in cables, the load and moment distribution of the bridge can be improved. In recent years, different research works have studied iterative and modern methods to find optimum stresses of cables. However, most of the proposed methods have limitations in optimising the structural performance of cable-stayed bridges. This paper presents a multiconstraint optimisation method to specify the optimum cable forces in cable-stayed bridges. The proposed optimisation method produces less bending moments and stresses in the bridge members and requires shorter simulation time than other proposed methods. The results of comparative study show that the proposed method is more successful in restricting the deck and pylon displacements and providing uniform deck moment distribution than unit load method (ULM). The final design of cable-stayed bridges can be optimised considerably through proposed multiconstraint optimisation method.

  19. A New Multiconstraint Method for Determining the Optimal Cable Stresses in Cable-Stayed Bridges

    Directory of Open Access Journals (Sweden)

    B. Asgari

    2014-01-01

    Full Text Available Cable-stayed bridges are one of the most popular types of long-span bridges. The structural behaviour of cable-stayed bridges is sensitive to the load distribution between the girder, pylons, and cables. The determination of pretensioning cable stresses is critical in the cable-stayed bridge design procedure. By finding the optimum stresses in cables, the load and moment distribution of the bridge can be improved. In recent years, different research works have studied iterative and modern methods to find optimum stresses of cables. However, most of the proposed methods have limitations in optimising the structural performance of cable-stayed bridges. This paper presents a multiconstraint optimisation method to specify the optimum cable forces in cable-stayed bridges. The proposed optimisation method produces less bending moments and stresses in the bridge members and requires shorter simulation time than other proposed methods. The results of comparative study show that the proposed method is more successful in restricting the deck and pylon displacements and providing uniform deck moment distribution than unit load method (ULM. The final design of cable-stayed bridges can be optimised considerably through proposed multiconstraint optimisation method.

  20. Structural behavior of concrete box bridge using embedded FBG sensors

    Science.gov (United States)

    Chung, Wonseok; Kang, Donghoon

    2012-04-01

    For the structural monitoring of railway bridges, electromagnetic interference (EMI) is a significant problem as modern railway lines are powered by high-voltage electric power feeding systems. Fiber optic sensing systems are free from EMI and have been successfully applied in civil engineering fields. This study presents the application of fiber Bragg grating (FBG)-based sensing systems to precast concrete box railway bridges. A 20 m long full-scale precast concrete box railway girder was fabricated and tested in order to identify its static performance. The experimental program involved the measurement of the nonlinear static behavior until failure. Multiplexed FBG strain sensors were embedded along the length of steel rebar and a strain-induced wavelength shift was measured in order to monitor internal strains. The measured values from the FBG-based sensors are compared with the results using electric signal-based sensors. The results show that the FBG sensing system is promising and can improve the efficiency of structural monitoring for modern railway bridges.

  1. Acoustic emission techniques applied to conventionally reinforced concrete bridge girders : final report.

    Science.gov (United States)

    2008-09-01

    Reinforced concrete (RC) bridges generally operate at service-level loads except during discrete overload events that can reduce the integrity of the structure by initiating concrete cracks, widening or extending of existing concrete cracks, as well ...

  2. Design of a Maglev Vibration Test Platform for the Research of Maglev Vehicle-girder Coupled Vibration Problem

    Directory of Open Access Journals (Sweden)

    Zhou Danfeng

    2017-01-01

    Full Text Available The maglev vehicle-girder coupled vibration problem has been encountered in many maglev test or commercial lines, which significantly degrade the performance of the maglev train. In previous research on the principle of the coupled vibration problem, it has been discovered that the fundamental model of the maglev girder can be simplified as a series of mass-spring resonators of different but related resonance frequencies, and that the stability of the vehicle-girder coupled system can be investigated by separately examining the stability of each mass-spring resonator – electromagnet coupled system. Based on this conclusion, a maglev test platform, which includes a single electromagnetic suspension control system, is built for experimental study of the coupled vibration problem. The guideway of the test platform is supported by a number of springs so as to change its flexibility. The mass of the guideway can also be changed by adjusting extra weights attached to it. By changing the flexibility and mass of the guideway, the rules of the maglev vehicle-girder coupled vibration problem are to be examined through experiments, and related theory on the vehicle-girder self-excited vibration proposed in previous research is also testified.

  3. Quality control and in-service inspection technology for hybrid-composite girder bridges.

    Science.gov (United States)

    2014-08-01

    This report describes efforts to develop quality control tools and in-service inspection technologies for the fabrication and construction of Hybrid Composite Beams (HCBs). HCBs are a new bridge technology currently being evaluated by the Missouri De...

  4. Impact response of RC rock-shed girder with sand cushion under falling load

    International Nuclear Information System (INIS)

    Bhatti, Abdul Qadir; Kishi, Norimitsu

    2010-01-01

    Research highlights: → An applicability of FE model of RC girders with sand cushion has been investigated. → Experimental and numerical results of Impact force, reaction force and displacement have been performed. → Cracks obtained from numerical models are in good agreement with the experimental ones. → Reaction force-displacement loops agree well between numerical and experimental results. → The configuration of the hysteretic loop at failure of RC girders can be approximated by a parallelogram. - Abstract: In order to establish a proper finite element model of prototype RC girder with sand element for impact response analysis, dynamic response analysis of RC girders with sand cushion subjected to impact force due to weight falling from the height of H = 2.5, 5, 7.5 and 10 m was performed to improve the state of the art of protective design for real scale rock-sheds by using LS-DYNA code. An applicability of proposed model was discussed comparing with experimental results (e.g. impact force, reaction force and displacement waves). From this study, dynamic characteristics of impact response can be better simulated by using the proposed model. As a result, when the sand cushion was set up, the impact force, reaction force, mid-span displacement waves, distribution of reaction force-displacement loops, and crack patterns obtained from the numerical analysis are in good agreement with those from the experimental results.

  5. Optimization of the box-girder of overhead crane with constrained ...

    African Journals Online (AJOL)

    haroun

    Keywords: Overhead crane - Box-girder - New bat algorithm - level of ... much more efficiency and robustness compared to the genetic algorithm (GA) and PSO ...... optimization: developments, applications and resources," in Evolutionary.

  6. Estimation of Structure-Borne Noise Reduction Effect of Steel Railway Bridge Equipped with Floating Ladder Track and Floating Reinforced-Concrete Deck

    Science.gov (United States)

    Watanabe, Tsutomu; Sogabe, Masamichi; Asanuma, Kiyoshi; Wakui, Hajime

    A number of steel railway bridges have been constructed in Japan. Thin steel members used for the bridges easily tend to vibrate and generate structure-borne noise. Accordingly, the number of constructions of steel railway bridges tends to decrease in the urban areas from a viewpoint of environmental preservation. Then, as a countermeasure against structure-borne noise generated from steel railway bridges, we have developed a new type of the steel railway bridge equipped with a floating-ladder track and a floating reinforced-concrete (RC) deck. As a result of train-running experiment, it became apparent that the new steel railway bridge installed by double floating system has reduced a vibration velocity level by 10.5 dB(A) at main girder web as compared with a steel railway bridge installed by directly fastened track. This reduction effect was achieved by the ladder track and RC deck supported by resilient materials.

  7. Application study on the first cable-stayed bridge with CFRP cables in China

    Directory of Open Access Journals (Sweden)

    Kuihua Mei

    2015-08-01

    Full Text Available In order to push forward the development of CFRP cable-stayed bridge and accumulate experiences, the study on the application of the first cable-stayed bridge with CFRP cables in China was carried out. The design essentials of main components of the bridge were introduced and its integral performances, including static properties, dynamic properties and seismic response were analyzed using finite element method. A new bond-type anchorage was developed and the processes of fabricating and installing CFRP cables were elaborated. Based on the results of construction simulation, a tension scheme for bridge was propound. During constructing, the stresses and displacement of girder and pylon, as well as the forces and stresses of cables, were tested. The results indicate that all sections of the bridge could meet the requirements of the ultimate bearing capacity and normal service; the performance of the anchorage is good and the stresses in each cable system are similar; the tested values accord well with the calculated values. Further, creep deformation of the resin in anchorages under service load is not obvious. All these results demonstrate that the first application of CFRP cables in the cable-stayed bridge in China is successful.

  8. Seismic enhancement of multi-span continuous bridges subjected to three-directional excitations

    Science.gov (United States)

    Aryan, H.; Ghassemieh, M.

    2015-04-01

    Considering the seismic ground motions as the excitations in only two principal horizontal directions of the bridges and ignoring the third vertical direction is a disregard for the seismic conditions of the region and the bridge distance from epicenter. Numerous cases of substantial damages have been reported among the bridges tremendously suffered from being exposed to the simultaneous three-directional seismic ground motions. Besides the significant compression and tension damages in the columns due to the presence of vertical excitation, it could lead to unexpected shear and flexural failures in the columns and other components as well. Because the axial force variation in the columns due to three-directional excitations, could affect the demands and capacities of the bridge’s components. With respect to this issue, several studies on the bridge damages during the earthquakes have urged researchers to offer efficient methods for bridges handling of the three-directional seismic excitations. Thus, this paper presents and evaluates a superelastic based system for designing as well as retrofitting the multi-span continuous (MSC) bridges that can cope with two- and three-directional seismic excitations. Efficiency evaluation of the proposed system is conducted through various nonlinear time history analyses on a three-dimensional model of a detailed MSC bridge using a suite of developed ground motions for the bridge region. Also, all the analyses are fulfilled based on variation of one influential design characteristic of the proposed system in order to achieve the optimal design. Several pertinent assessment parameters are used during the evaluation of the proposed system. Finally, the efficiency of the new system subjected to the vertical and horizontal seismic excitations is confirmed according to reduction of the bridge responses and improvement in nonlinear performance of the columns in comparison with the as-built bridge results.

  9. Aeroelastic Response from Indicial Functions with a Finite Element Model of a Suspension Bridge

    Science.gov (United States)

    Mikkelsen, O.; Jakobsen, J. B.

    2017-12-01

    The present paper describes a comprehensive analysis of the aeroelastic bridge response in time-domain, with a finite element model of the structure. The main focus is on the analysis of flutter instability, accounting for the wind forces generated by the bridge motion, including twisting as well as vertical and horizontal translation, i.e. all three global degrees of freedom. The solution is obtained by direct integration of the equations of motion for the bridge-wind system, with motion-dependent forces approximated from flutter derivatives in terms of rational functions. For the streamlined bridge box-girder investigated, the motion dependent wind forces related to the along-wind response are found to have a limited influence on the flutter velocity. The flutter mode shapes in the time-domain and the frequency domain are consistent, and composed of the three lowest symmetrical vertical modes coupled with the first torsional symmetric mode. The method applied in this study provides detailed response estimates and contributes to an increased understanding of the complex aeroelastic behaviour of long-span bridges.

  10. Seismic fragility curves of bridge piers accounting for ground motions in Korea

    Science.gov (United States)

    Nguyen, Duy-Duan; Lee, Tae-Hyung

    2018-04-01

    Korea is located in a slight-to-moderate seismic zone. Nevertheless, several studies pointed that the peak earthquake magnitude in the region can be reached to approximately 6.5. Accordingly, a seismic vulnerability evaluation of the existing structures accounting for ground motions in Korea is momentous. The purpose of this paper is to develop seismic fragility curves for bridge piers of a steel box girder bridge equipped with and without base isolators based on a set of ground motions recorded in Korea. A finite element simulation platform, OpenSees, is utilized to perform nonlinear time history analyses of the bridges. A series of damage states is defined based on a damage index which is expressed in terms of the column displacement ductility ratio. The fragility curves based on Korean motions were thereafter compared with the fragility curves generated using worldwide earthquakes to assess the effect of the two ground motion groups on the seismic fragility curves of the bridge piers. The results reveal that both non- and base-isolated bridge piers are less vulnerable during the Korean ground motions than that under worldwide earthquakes.

  11. Bridge condition assessment based on long-term strain monitoring

    Science.gov (United States)

    Sun, LiMin; Sun, Shouwang

    2011-04-01

    In consideration of the important role that bridges play as transportation infrastructures, their safety, durability and serviceability have always been deeply concerned. Structural Health Monitoring Systems (SHMS) have been installed to many long-span bridges to provide bridge engineers with the information needed in making rational decisions for maintenance. However, SHMS also confronted bridge engineers with the challenge of efficient use of monitoring data. Thus, methodologies which are robust to random disturbance and sensitive to damage become a subject on which many researches in structural condition assessment concentrate. In this study, an innovative probabilistic approach for condition assessment of bridge structures was proposed on the basis of long-term strain monitoring on steel girder of a cable-stayed bridge. First, the methodology of damage detection in the vicinity of monitoring point using strain-based indices was investigated. Then, the composition of strain response of bridge under operational loads was analyzed. Thirdly, the influence of temperature and wind on strains was eliminated and thus strain fluctuation under vehicle loads is obtained. Finally, damage evolution assessment was carried out based on the statistical characteristics of rain-flow cycles derived from the strain fluctuation under vehicle loads. The research conducted indicates that the methodology proposed is qualified for structural condition assessment so far as the following respects are concerned: (a) capability of revealing structural deterioration; (b) immunity to the influence of environmental variation; (c) adaptability to the random characteristic exhibited by long-term monitoring data. Further examination of the applicability of the proposed methodology in aging bridge may provide a more convincing validation.

  12. Low Cost Wireless Fatigue Crack Monitoring System Using RFID Arrays

    Science.gov (United States)

    2018-03-23

    The use of welded steel cover plates had been a common design practice to increase beam section capacity in regions ofhigh torsion for decades. Many steel girder bridges with cover plates are still in service. Steel girder bridges are subject to cycl...

  13. A Comparative Assessment of Aerodynamic Models for Buffeting and Flutter of Long-Span Bridges

    Directory of Open Access Journals (Sweden)

    Igor Kavrakov

    2017-12-01

    Full Text Available Wind-induced vibrations commonly represent the leading criterion in the design of long-span bridges. The aerodynamic forces in bridge aerodynamics are mainly based on the quasi-steady and linear unsteady theory. This paper aims to investigate different formulations of self-excited and buffeting forces in the time domain by comparing the dynamic response of a multi-span cable-stayed bridge during the critical erection condition. The bridge is selected to represent a typical reference object with a bluff concrete box girder for large river crossings. The models are viewed from a perspective of model complexity, comparing the influence of the aerodynamic properties implied in the aerodynamic models, such as aerodynamic damping and stiffness, fluid memory in the buffeting and self-excited forces, aerodynamic nonlinearity, and aerodynamic coupling on the bridge response. The selected models are studied for a wind-speed range that is typical for the construction stage for two levels of turbulence intensity. Furthermore, a simplified method for the computation of buffeting forces including the aerodynamic admittance is presented, in which rational approximation is avoided. The critical flutter velocities are also compared for the selected models under laminar flow. Keywords: Buffeting, Flutter, Long-span bridges, Bridge aerodynamics, Bridge aeroelasticity, Erection stage

  14. A numerical study on the structural integrity of self-anchored cable-stayed suspension bridges

    Directory of Open Access Journals (Sweden)

    Paolo Lonetti

    2016-10-01

    Full Text Available A generalized numerical model for predicting the structural integrity of self-anchored cable-stayed suspension bridges considering both geometric and material nonlinearities is proposed. The bridge is modeled by means of a 3D finite element approach based on a refined displacement-type finite element approximation, in which geometrical nonlinearities are assumed in all components of the structure. Moreover, nonlinearities produced by inelastic material and second order effects in the displacements are considered for girder and pylon elements, which combine gradual yielding theory with CRC tangent modulus concept. In addition, for the elements of the suspension system, i.e. stays, hangers and main cable, a finite plasticity theory is adopted to fully evaluate both geometric and material nonlinearities. In this framework, the influence of geometric and material nonlinearities on the collapse bridge behavior is investigated, by means of a comparative study, which identifies the effects produced on the ultimate bridge behavior of several sources of bridge nonlinearities involved in the bridge components. Results are developed with the purpose to evaluate numerically the influence of the material and geometric characteristics of self-anchored cable-stayed suspension bridges with respect also to conventional bridge based on cablestayed or suspension schemes

  15. 78 FR 52232 - 2013 Temporary Closure of I-65 (I-70/I-65 South Split Interchange) in the City of Indianapolis

    Science.gov (United States)

    2013-08-22

    ... southbound bridge girders and lowering the pavement section from south of Morris Street to north of Fletcher... immediately. FOR FURTHER INFORMATION CONTACT: Ms. Crystal Jones, Office of Freight Management and Operations..., which consists of replacing the northbound and southbound bridge girders and lowering the pavement...

  16. Alignment and girder position of MSE septa in the new LSS4 extraction channel of the SPS

    CERN Document Server

    Balhan, B; Rizzo, A; Weterings, W; CERN. Geneva. SPS and LHC Division

    2002-01-01

    For the extraction of the beam from the Super Proton Synchrotron (SPS) to ring 2 of the Large Hadron Collider (LHC) and the CERN Neutrino to Gran Sasso (CNGS)facility, a new fast-extraction system is being constructed in the long straight section LSS4 of the SPS. Besides extraction bumpers, enlarged aperture quadrupoles and extraction kicker magnets (MKE), six conventional DC septum magnets (MSE) are used. These magnets are mounted on a single rigid support girder, pre-aligned so as to follow the trajectory of the extracted beam and optimise the available aperture. The girder has been motorised in order to optimise the local SPS aperture during setting up, so as to avoid the risk of circulating beam impact on the septum coils. In this note, we briefly present the trajectory and apertures of the beam, we describe the calculations and methods that have been used to determine the magnet position on the girder, and finally we report on the details of the girder movement and alignment.

  17. 47 CFR 80.1007 - Bridge-to-bridge radiotelephone installation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge radiotelephone installation. 80.1007 Section 80.1007 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... Bridge-to-Bridge Act § 80.1007 Bridge-to-bridge radiotelephone installation. Use of the bridge-to-bridge...

  18. Cable-stayed PC bridge with inclined main tower. Hachinohe port island bridge; Keisha shuto to yusuru 2 keikan renzoku PC shachokyo. Hachinoheko port island renrakykyo (kasho)

    Energy Technology Data Exchange (ETDEWEB)

    Hasegawa, A. [Hachinohe Institute of Technology, Aomori (Japan)

    1994-09-15

    The design and construction of the inclined main bridge, which is being constructed at the mouth of the Hachinohe Harbor (in Japan), are outlined in this paper. This connecting bridge has an overall length of 265.56 m, and consists of the main bridge member of asymmetric 2 cable-stayed PC bridge and the 3 cable-stayed PC box member bridge. An asymmetric design was employed for the main bridge frame to ensure the access space for small ships passing between bridge girders, easy maintenance and service, improved economy, and excellent view. The main tower is a single-pillar reinforced concrete structure with an inclination of 15{degree} and 47 m in height. Forty-eight diagonal cables are arranged so that 12 cable trains are connected to the main tower on the right and left sides respectively, and the back-stay cable structure is used for each upper 3 cable trains to improve safety against the earthquake. The main beam is made by a prestressed concrete structure with inverse trapezoidal 3-chamber frame section. This structure is superior in increasing the safety against wind. Steel tube sheet-pile well is selected for the bridge pier base, and debris layer is selected as a support layer for the base. For the construction of the lower bridge section, sand conversion through predrilling of rubble-mound and debris layer was executed. The underwater non-separative concrete and embedded type frame are used around the bridge piers and its surrounding. For the construction of the upper bridge section, steel frames are used inside the main tower to ensure the construction precision. 7 figs.

  19. Vibration analysis of concrete bridges during a train pass-by using various models

    International Nuclear Information System (INIS)

    Li, Qi; Wang, Ke; Cheng, Shili; Li, Wuqian; Song, Xiaodong

    2016-01-01

    The vibration of a bridge must be determined in order to predict the bridge noise during a train pass-by. It can be generally solved with different models either in the time domain or the frequency domain. The computation cost and accuracy of these models vary a lot in a wide frequency band. This study aims to compare the results obtained from various models for recommending the most suitable model in further noise prediction. First, train-track-bridge models in the time domain are developed by using the finite element method and mode superposition method. The rails are modeled by Timoshenko beam elements and the bridge is respectively modeled by shell elements and volume elements. Second, power flow models for the coupled system are established in the frequency domain. The rails are modelled by infinite Timoshenko beams and the bridge is respectively represented by three finite element models, an infinite Kirchhoff plate, and an infinite Mindlin plate model. The vibration at given locations of the bridge and the power input to the bridges through the rail fasteners are calculated using these models. The results show that the shear deformation of the bridge deck has significant influences on the bridge vibration at medium-to-high frequencies. The Mindlin plate model can be used to represent the U-shaped girder to obtain the power input to the bridge with high accuracy and efficiency. (paper)

  20. Nigerian Journal of Technology - Vol 33, No 4 (2014)

    African Journals Online (AJOL)

    Evaluation of the Suitability of Low-Density Polyethylene (LDPE) Waste as Fine Aggregate in Concrete · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT DOWNLOAD FULL ... Stress Distribution in Continuous Thin-Walled Multi-Cell Box Girder Bridges · EMAIL FREE FULL TEXT EMAIL FREE FULL TEXT DOWNLOAD ...

  1. Modal analysis of railway bridge hangers using artificial and ambient excitation

    Science.gov (United States)

    Link, M.; Weiland, M.; Yu, F.

    2002-12-01

    This paper describes the methods used and results obtained from analysing some resonance phenomena which were observed on a steel railway bridge. These phenomena were visible on the slender hangers connecting the arch girder and the main truss girder under certain wind conditions. The paper describes the set up of a vibration monitoring system designed to measure the vibration response of the hangers together with the wind velocity and the wind direction over a period of several months under operational conditions. These data should yield the basis for correlating the wind and the structural characteristics. In addition artificial impulse hammer excitation was used to measure the modal characteristics (natural frequencies and modes of the hangers separately. The results of these tests compared well with those obtained from applying some “output only" modal identification techniques to the operational response data with unknown excitation forces. The results also compared well to analytical predictions and were used to identify the axial forces in the hangers by updating the axial force minimising the test/analysis deviations. The results allowed to estimate the fatigue life of the hangers confirming the need for the design of anti- vibration devices.

  2. Fatigue analysis and life prediction of composite highway bridge decks under traffic loading

    Directory of Open Access Journals (Sweden)

    Fernando N. Leitão

    Full Text Available Steel and composite (steel-concrete highway bridges are currently subjected to dynamic actions of variable magnitude due to convoy of vehicles crossing on the deck pavement. These dynamic actions can generate the nucleation of fractures or even their propagation on the bridge deck structure. Proper consideration of all of the aspects mentioned pointed our team to develop an analysis methodology with emphasis to evaluate the stresses through a dynamic analysis of highway bridge decks including the action of vehicles. The design codes recommend the application of the curves S-N associated to the Miner's damage rule to evaluate the fatigue and service life of steel and composite (steel-concrete bridges. In this work, the developed computational model adopted the usual mesh refinement techniques present in finite element method simulations implemented in the ANSYS program. The investigated highway bridge is constituted by four longitudinal composite girders and a concrete deck, spanning 40.0m by 13.5m. The analysis methodology and procedures presented in the design codes were applied to evaluate the fatigue of the bridge determining the service life of the structure. The main conclusions of this investigation focused on alerting structural engineers to the possible distortions, associated to the steel and composite bridge's service life when subjected to vehicle's dynamic actions.

  3. Container crane for sea freight containers

    NARCIS (Netherlands)

    Luttekes, E.; Rijsenbrij, J.C.

    2001-01-01

    The invention relates to a container crane for loading and unloading seaborne containers. The container crane comprises a bridge girder (7), a jib (8), at least two crabs (11, 12) which can travel along the said bridge girder and/or jib and are provided with hoist means for lifting and lowering the

  4. Dynamic response of the train-track-bridge system subjected to derailment impacts

    Science.gov (United States)

    Ling, Liang; Dhanasekar, Manicka; Thambiratnam, David P.

    2018-04-01

    Derailments on bridges, although not frequent, when occurs due to a complex dynamic interaction of the train-track-bridge structural system, are very severe. Furthermore, the forced vibration induced by the post-derailment impacts can toss out the derailed wagons from the bridge deck with severe consequences to the traffic underneath and the safety of the occupants of the wagons. This paper presents a study of the train-track-bridge interaction during a heavy freight train crossing a concrete box girder bridge from a normal operation to a derailed state. A numerical model that considers the bridge vibration, train-track interaction and the train post-derailment behaviour is formulated based on a coupled finite-element - multi-body dynamics (FE-MBD) theory. The model is applied to predict the post-derailment behaviour of a freight train composed of one locomotive and several wagons, as well as the dynamic response of a straight single-span simply supported bridge containing ballast track subjected to derailment impacts. For this purpose, a typical derailment scenario of a heavy freight train passing over a severe track geometry defect is introduced. The dynamic derailment behaviour of the heavy freight train and the dynamic responses of the rail bridge are illustrated through numerical examples. The results exhibit the potential for tossing out of the derailed trains from the unstable increase in the yaw angle signature and a lower rate of increase of the bridge deck bending moment compared to the increase in the static axle load of the derailed wheelset.

  5. Proposal of self-anchored cable-supported bridge with main span length of 500m; Chuo span 500m kibo no jiteishiki tsurigatashiki kyoryo ni kansuru teian

    Energy Technology Data Exchange (ETDEWEB)

    Fukasawa, Y.; Sugiyama, T. [Yamaguchi University, Yamaguchi (Japan). Faculty of Engineering; Kaneko, S.; Mukoyama, T.; Iwaki, T. [Pacific Consultants K.K., Tokyo (Japan)

    1995-12-15

    In order to investigate the feasibility of construction of cable-supported bridge at the site where ground condition is poor and/or air route restriction shoed be considered the static and dynamic characteristics of both self-anchored cable-stayed bridge with relatively low tower and self-anchored suspension bridge have been discussed. The main span length of bridge considered here is about 500 m because of the fact that stress resultant of main girder caused by design loads is considerably lower than its design strength in the existing cable-supported bridges of this scale. The result shows that the application of both types of cable-supported bridges to the above described site may be possible as enough static safety and economy are ensured. It has been also revealed that no problem may occur from both wind and earthquake resistant viewpoints. 10 refs., 24 figs., 8 tabs.

  6. Evaluation of performance and maximum length of continuous decks in bridges : part 1.

    Science.gov (United States)

    2011-06-01

    The purpose of this research was to evaluate the performance history of continuous bridge decks in the State of Georgia, to determine why the current design detail works, to recommend a new design detail, and to recommend the maximum and/or optimum l...

  7. Optimization of the box-girder of overhead crane with constrained ...

    African Journals Online (AJOL)

    Keywords: Overhead crane - Box-girder - New bat algorithm - level of comparison - Higher strength steel. Optimisation de poutre caisson de pont roulant avec un nouvel algorithme de chauve souris sous contrainte. Une conception optimale pour un poids minimal de la poutre principale d'un pont roulant peut réduire ...

  8. Full scale test of a SSP 34m box girder 1. Data report; Reinforced glass fiber/expoxy used in wind turbine blades

    Energy Technology Data Exchange (ETDEWEB)

    Jensen, Find M.; Branner, K.; Nielsen, Per H. (and others)

    2008-03-15

    This report presents the setup and result of a full-scale test of a reinforced glass fibre/epoxy box girder used in 34m wind turbine blade. The tests were performed at the Blaest test facility in August 2006. The test is an important part of a research project established in cooperation between Risoe DTU, the National Laboratory for Sustainable Energy at the Technical University of Denmark -, SSP-Technology A/S and Blaest (Blade test centre A/S) and it has been performed as a part of Find Moelholt Jensen's PhD study. This report contains the complete test data for the final test, in which the box girder was loaded until failure. A comprehensive description of the test setup is given. This report deals only with tests and results. There are no conclusions on the data in this report, but references are given to publications, where the data are used and compared with FEM etc. Various kinds of measuring equipment have been used during these tests: acoustic emission, 330 strain gauges, 24 mechanical displacement devices and two optical deformation measuring systems. The mechanical displacement devices measured both global (absolute) and local (relative) deflection and the optical systems measured surface deformation. A prediction was made on the location of the failure of the girder. At this location the majority of the measuring equipment was concentrated. The prediction was proved to be correct and valuable information of the behaviour of the box girder prior to failure was obtained. The experimental investigation consisted of the following load configurations: -Flapwise bending -Torsion Ultrasonic scanning of the box girder was performed before, during and after the test the box girder. This was done to investigate whether the girder was damaged by the load or imperfection (productions defects) growth. (au)

  9. Use and selection of bridges as day roosts by Rafinesque's Big Eared Bats.

    Energy Technology Data Exchange (ETDEWEB)

    Bennett, Frances, M.; Loeb, Susan, C.; Bunch, Mary, S.; Bowerman, William, W.

    2008-03-01

    ABSTRACT.—Rafinesque’s big-eared bats (Corynorhinus rafinesquii) use bridges as day roosts in parts of their range, but information on bridge use across their range is lacking. From May to Aug. 2002 we surveyed 1129 bridges (12.5%) within all 46 counties of South Carolina to determine use and selection of bridges as day roosts by big-eared bats and to document their distribution across the state. During summer 2003, we visited 235 bridges in previously occupied areas of the state to evaluate short-term fidelity to bridge roosts. We found colonies and solitary big-eared bats beneath 38 bridges in 2002 and 54 bridges in 2003. Construction type and size of bridges strongly influenced use in both years; bats selected large, concrete girder bridges and avoided flat-bottomed slab bridges. The majority of occupied bridges (94.7%) were in the Upper and Lower Coastal Plains, but a few bridges (5.3%) were located in the Piedmont. Rafinesque’s big-eared bats were absent beneath bridges in the Blue Ridge Mountains. We established new records of occurrence for 10 counties. In the Coastal Plains, big-eared bats exhibited a high degree of short-term fidelity to roosts in highway bridges. For bridges that were occupied at least once, mean frequency of use was 65.9%. Probability of finding bats under a bridge ranged from 0.46 to 0.73 depending on whether the bridge was occupied in the previous year. Thus, bridges should be inspected three to five times in a given year to determine whether they are being used. Regional bridge roost surveys may be a good method for determining the distribution of C. rafinesquii, particularly in the Coastal Plains, and protection of suitable bridges may be a viable conservation strategy where natural roost sites are limited.

  10. Planning and design of the Ikedako bride (temporary name); Ikedakokyo (kasho) no keikaku to sekkei

    Energy Technology Data Exchange (ETDEWEB)

    Mochizuki, H.; Iizuka, Y.; Yukawa, Y. [Japan Highway Public Corporation, Tokyo (Japan)

    1997-09-30

    This paper describes the planning and design of the Ikeda-Lake Bridge of the Tokushima Express Way. This bridge is a PC (prestressed concrete) five-span continuous balanced arch bridge with a length 705 m. This bridge transverses prefectural road, Ikeda Dam Lake of Yoshino River, park, JR line, national highway, and town road, and both ends of the bridge are tunnels, resulting in the complicated bridging condition. Various bridging methods were examined from the viewpoint of structural characteristics, workability, profitability, maintenance/management, and aspect. A bridge with PC stiffening girders was adopted. The maximum interval between supports is 200 m. This bridge has the largest scale as a concrete arch bridge in Japan. Basements of bridge piers were constructed by pneumatic caisson method and large-diameter deep basement method. Since basements were located in the dam lake and they were quickly constructed in a short period in a non-flood season, steel caissons were separately fabricated in the dock, towed and placed for excavation. For the construction of upper section, overhang method was adopted using movable working vehicle. For the construction of arch section, the arch was overhung simultaneously in the both sides by composing the truss using stiffened girders, arch ribs, vertical members, and temporary cable stayed members, which was the first in Japan. In 1997, basement construction was completed, and construction of bridge piers and a part of the construction of upper section have been started. 2 refs., 12 figs.

  11. Continuous fatigue crack monitoring of bridges: Long-Term Electrochemical Fatigue Sensor (LTEFS)

    Science.gov (United States)

    Moshier, Monty A.; Nelson, Levi; Brinkerhoff, Ryan; Miceli, Marybeth

    2016-04-01

    Fatigue cracks in steel bridges degrade the load-carrying capacity of these structures. Fatigue damage accumulation caused by the repetitive loading of everyday truck traffic can cause small fatigue cracks initiate. Understanding the growth of these fatigue cracks is critical to the safety and reliability of our transportation infrastructure. However, modeling fatigue in bridges is difficult due to the nature of the loading and variations in connection integrity. When fatigue cracks reach critical lengths failures occur causing partial or full closures, emergency repairs, and even full structural failure. Given the aging US highway and the trend towards asset management and life extension, the need for reliable, cost effective sensors and monitoring technologies to alert bridge owners when fatigue cracks are growing is higher than ever. In this study, an innovative Long-Term Electrochemical Fatigue Sensor (LTEFS) has been developed and introduced to meet the growing NDT marketplace demand for sensors that have the ability to continuously monitor fatigue cracks. The performance of the LTEFS has been studied in the laboratory and in the field. Data was collected using machined specimens with different lengths of naturally initiated fatigue cracks, applied stress levels, applied stress ratios, and for both sinusoidal and real-life bridge spectrum type loading. The laboratory data was evaluated and used to develop an empirically based algorithm used for crack detection. Additionally, beta-tests on a real bridge structure has been completed. These studies have conclusively demonstrated that LTEFS holds great potential for long-term monitoring of fatigue cracks in steel structures

  12. Analysis of vibration characteristics of a prestressed concrete cable-stayed bridge using strong motion observation data. Jishin kansoku ni motozuku PC shachokyo no shindo tokusei no kaiseki

    Energy Technology Data Exchange (ETDEWEB)

    Inatomi, T. (Port and Harbour Research Institute, Kanagawa (Japan)); Takeda, T.; Obi, N.; Yamanobe, S. (Kajima Corp., Tokyo (Japan))

    1994-05-31

    Records of seismic observation were analyzed for the purpose of proving the validity of antiseismic design for a prestressed concrete (PC) cable-stayed bridge. This bridge is a three span continuous PC cable-stayed bridge of 498 m in bridge length, and is constructed on alluvial soft ground. The seismometer used is a servo type accelerometer. The observed frequency and mode of seismic vibration are in good agreement with those in the analysis and hence the validity of modelling of the structure in designing was confirmed. It was also confirmed that the bending vibration and torsional vibration of the main girder are separated as designed. However, some points such as a large difference in the observed vibration and analysed vibration in the mode accompanying rotation of the base are listed as problems to be solved in antiseismic design. In order to investigate the attenuation constant of the upper structure, a seismic wave response analysis was performed and its results were compared with observed ones. When the attenuation constant is assumed to be 2%, agreement of data between analysis and observation is good, and it is considered that the attenuation constant of the upper structure only without the effects of attenuation of energy escape from the base and crack generation in concrete was about 2% in the observed earthquake (maximum acceleration on the ground: 51 Gal). 8 refs., 9 figs., 2 tabs.

  13. Increasing the Capacity of Existing Bridges by Using Unbonded Prestressing Technology: A Case Study

    Directory of Open Access Journals (Sweden)

    Antonino Recupero

    2014-01-01

    Full Text Available External posttensioning or unbonded prestressing was found to be a powerful tool for retrofitting and for increasing the life extension of existing structures. Since the 1950s, this technique of reinforcement was applied with success to bridge structures in many countries, and was found to provide an efficient and economic solution for a wide range of bridge types and conditions. Unbonded prestressing is defined as a system in which the post-tensioning tendons or bars are located outside the concrete cross-section and the prestressing forces are transmitted to the girder through the end anchorages, deviators, or saddles. In response to the demand for a faster and more efficient transportation system, there was a steady increase in the weight and volume of traffic throughout the world. Besides increases in legal vehicle loads, the overloading of vehicles is a common problem and it must also be considered when designing or assessing bridges. As a result, many bridges are now required to carry loads significantly greater than their original design loads; and their deck results still deteriorated by cracking of concrete, corrosion of rebars, snapping of tendons, and so forth. In the following, a case study about a railway bridge retrofitted by external posttensioning technique will be illustrated.

  14. Simulation Study on Train-Induced Vibration Control of a Long-Span Steel Truss Girder Bridge by Tuned Mass Dampers

    Directory of Open Access Journals (Sweden)

    Hao Wang

    2014-01-01

    Full Text Available Train-induced vibration of steel truss bridges is one of the key issues in bridge engineering. This paper talks about the application of tuned mass damper (TMD on the vibration control of a steel truss bridge subjected to dynamic train loads. The Nanjing Yangtze River Bridge (NYRB is taken as the research object and a recorded typical train load is included in this study. With dynamic finite element (FE method, the real-time dynamic responses of NYRB are analyzed based on a simplified train-bridge time-varying system. Thereinto, two cases including single train moving at one side and two trains moving oppositely are specifically investigated. According to the dynamic characteristics and dynamic responses of NYRB, the fourth vertical bending mode is selected as the control target and the parameter sensitivity analysis on vibration control efficiency with TMD is conducted. Using the first-order optimization method, the optimal parameters of TMD are then acquired with the control efficiency of TMD, the static displacement of Midspan, expenditure of TMDs, and manufacture difficulty of the damper considered. Results obtained in this study can provide references for the vibration control of steel truss bridges.

  15. Ultimate strength analysis of long-span cable-stayed bridges; Chodai chachokyo no shukyoku kyodo kaiseki to kyodo ni kansuru ichikosatsu

    Energy Technology Data Exchange (ETDEWEB)

    Xie, X.; Yamaguchi, H. [Saitama Univ., Urawa (Japan)] Nagai, M. [Nagaoka Technical Coll., Niigata (Japan)

    1998-07-21

    Recently, span of cable-stayed bridges has been getting loner and longer, present situation is that cable-stayed bridges with span 600 to 800m class have been built inside and outside the country, and accurate determination of its ultimate strength has been an important problem statistically. However, concrete design method for evaluating load bearing stress of long-span cable-stayed bridge. Particularly of the main beam whose axial stress is dominating, has not been established so far. As for cable-stayed bridge, even for long-span, effect of plasticization of cross section on ultimate strength is severe because there is little effect of geometric nonlinearity and it is thought that accurate evaluation of ultimate strength only by elastic finite potential analysis is difficult. Accordingly, it is necessary to study the behavior by using combined nonlinear analysis considering the nonlinearity of the material in order to evaluate the safety and economy to long-span cable-stayed bridge. In this report, 3 dimensional analysis method was formularized taking into account the combine nonlinearity of multi-box girder and analysis program of ultimate strength behavior of long-span cable-stayed bridge was developed. 19 refs., 17 figs., 2 tabs.

  16. STUDY, EVALUATION AND TEST OF SUBMODULE TO GIRDER BOLTED JOINT

    CERN Document Server

    Blocki, J; Miralles, Ll; Topilin, N D

    2000-01-01

    The object of the present work is to study the bolted joint submodule to girder. This joint is critical from the point of view of the mechanical integrity of the Tilecal Barrel and Extended Barrel modules and LAr Endcaps. Theoretical analysis, FEM calculations and tests have been carried out in order to find a solution that fulfils the safety factors design criteria.

  17. Research on Fluid Viscous Damper Parameters of Cable-Stayed Bridge in Northwest China

    Directory of Open Access Journals (Sweden)

    Xiongjun He

    2017-01-01

    Full Text Available To optimize the aseismic performance of nonlinear fluid viscous dampers (FVD of cable-stayed bridge in the highly seismic zone, Xigu Yellow River Bridge in northwest China is taken as an example. Nonlinear time-history analysis method is used to research on the relation among the internal forces, displacements, and damping parameters of the 650 tonnage FVD. The method of getting the minimum of binary functions is used to obtain the optimal parameters of FVD. Also, the 1 : 1 full-scale FVD model is made and used in the constitutive relation test. Then the test result of the damping parameters can be got by normal equation method. The optimized method to obtain the damping parameters is further verified. The results indicate that seismic response in key positions of the cable-stayed bridge can be reduced by installing longitudinal nonlinear FVD between the towers and girders if choosing reasonable damping parameters C and ξ. The optimal damping parameters can be calculated accurately by the proposed method of optimizing damping parameters of nonlinear FVD, and the constitutive relation test verifies the correctness of the optimization analysis method. Conclusions concerned can be applied to the design of nonlinear FVD for cable-stayed bridges.

  18. Static and fatigue investigation of second generation steel free bridge decks

    International Nuclear Information System (INIS)

    Klowak, C.; Memon, Amjad H.; Mufti, Aftab A.

    2006-01-01

    This paper outlines the static and fatigue behavior of two different cast-in-place second generation steel-free bridge decks, which are: hybrid carbon fiber reinforced polymer (CFRP); and glass fiber reinforced polymer (GFRP) and steel strap design. Although cast monolithically, the first deck slab was divided into three segments with different reinforcement configurations. All three segments were tested under a 222kN cyclic loading to investigate fatigue behavior. The second bridge deck comprised an internal panel and two cantilevers and was equipped with a civionics system. The internal panel static test that this paper deals with is useful in the development of fatigue theory derived from fatigue testing of the first bridge deck. Test results form the cyclic loading of the first bridge deck indicated that the cross-sectional area of the reinforcement used in the test bridge deck can be reduced by 40% based on the reinforcement provided in the deck under service loads. The hybrid system also reduced the development of longitudinal crack widths to approximately 0.4 mm under service conditions, compared to the cracks that occurred approximately halfway between adjacent bridge girders that were determined to be roughly 1 mm in several first generation steel-free bridge decks constructed in Canada. Civionics, also discussed in the paper, is a new term coined from Civil-Electronics, which is the application of electronics to civil structures. The Civionics Specifications (2004) developed by ISIS Canada researchers are a helpful design tool for engineers and contractors to develop civionics and structural health monitoring systems for civil infrastructure that will last the lifetime of a structure. The use of civionics for the second test bridge deck ensured the survival of 100% of the 63 internal sensors throughout the rigors of the construction and casting of the deck. (author)

  19. Puentes extradosados: evolución y tendencias actuales

    Directory of Open Access Journals (Sweden)

    José Miguel Benjumea Royero

    2012-09-01

    Full Text Available Since their appearance in 1994, extradosed bridges have played an important role in road and railway projects, competing (in medium span lengths with cables-stayed and prestressed box girder bridges. At a regional level, extradosed bridges have been implemented more frequently in Asia, but recent projects developed in Europe and America show a growing interest in this typology. Consequently, this paper is aimed at offering a survey viewpoint on the evolution of extradosed bridges, from their origin to their current applications. This paper is also intended to show the adopted structural trends by presenting existing extradosed bridges, bridges under construction, and newly designed bridges. Finally, the main advantages and disadvantages of this type of bridges are analyzed and compared to cable-stayed and prestressed box girder bridges.

  20. A FULL-SCALE MEASUREMENT OF WIND ACTIONS AND EFFECTS ON A SEA-CROSSING BRIDGE

    Directory of Open Access Journals (Sweden)

    Yi Zhou

    2017-10-01

    Full Text Available Wind loading is critical for the large-span and light-weight structures, and field measurement is the most effective way to evaluate the wind resistance performance of a specific structure. This study investigates the wind characteristics and wind-induced vibration on a sea-crossing bridge in China, namely Donghai Bridge, based on up to six years of monitoring data. It is found that: (1 there exists obvious discrepancy between the measured wind field parameters and the values suggested by the design code; and the wind records at the bridge site is easily interfered by the bridge structure itself, which should be considered in interpreting the measurements and designing structural health monitoring systems (SHMS; (2 for strong winds with high non-stationarity, a shorter averaging time than 10-min is preferable to obtain more stable turbulent wind characteristics; (3 the root mean square (RMS of the wind-induced acceleration of the girder may increase in an approximately quadratic curve relationship with the mean wind speed; and (4 compared to traffic load, the wind dominates the girder’s lateral vibration amplitude, while the heavy-load traffic might exert more influence on the girder’s vertical and torsional vibrations than the high winds. This study provides field evidence for the wind-resistant design and evaluation of bridges in similar operational conditions.

  1. Investigation and Control of VIVs with Multi-Lock-in Regions on Wide Flat Box Girders

    Directory of Open Access Journals (Sweden)

    Bo Wu

    2017-01-01

    Full Text Available On the preliminary designing of a wide flat box girder with the slenderness ratio 12, vertical and torsional vortex-induced vibrations (VIV are observed in wind tunnel tests. More than one lock-in region, which are defined as “multi-lock-in regions,” are recorded. Therefore, suspicions should be aroused regarding the viewpoint that wide box girders are aerodynamic friendly. As the three nascent vortexes originating at the pedestrian guardrails and inspection rails shed to near-wake through different pathways with different frequencies, the mechanisms of VIVs and multi-lock-in regions are analyzed to be determined by the inappropriate subsidiary structures. A hybrid method combining Large Eddy Simulation (LES with experimental results is introduced to study the flow-structure interactions (FSI when undergoing VIVs; the vortex mode of torsional VIV on wide flat box girders is defined as “4/2S,” which is different from any other known ones. Based on the mechanism of VIV, a new approach by increasing ventilation rate of the pedestrian guardrails is proved to be effective in suppressing vertical and torsional VIVs, and it is more feasible than other control schemes. Then, the control mechanisms are deeper investigated by analyzing the evolution of vortex mode and FSI using Hybrid-LES method.

  2. Assessing Static Performance of the Dashengguan Yangtze Bridge by Monitoring the Correlation between Temperature Field and Its Static Strains

    Directory of Open Access Journals (Sweden)

    Gao-Xin Wang

    2015-01-01

    Full Text Available Taking advantage of the structural health monitoring system installed on the steel truss arch girder of Dashengguan Yangtze Bridge, the temperature field data and static strain data are collected and analyzed for the static performance assessment of the bridge. Through analysis, it is found that the static strain changes are mainly caused by temperature field (temperature and temperature difference and train. After the train-induced static strains are removed, the correlation between the remaining static strains and the temperature field shows apparent linear characteristics, which can be mathematically modeled for the description of static performance. Therefore, multivariate linear regression function combined with principal component analysis is introduced to mathematically model the correlation. Furthermore, the residual static strains of mathematical model are adopted as assessment indicator and three kinds of degradation regulations of static performance are obtained after simulation of the residual static strains. Finally, it is concluded that the static performance of Dashengguan Yangtze Bridge was in a good condition during that period.

  3. Experiments and theory on deck and girder crushing

    DEFF Research Database (Denmark)

    Simonsen, Bo Cerup; Ocakli, Hasan

    1999-01-01

    -deflection curves and modes of deformation for decks, stringer decks and deep thin-walled beams subjected to central or excentric point loads between transverse frames. Based on theory and experiments, various modelling aspects of the local/global failure of the beams are discussed. The agreement between......This paper is concerned with theoretical and experimental analysis of deep plastic collapse of a deck or deep girder subjected to an in-plane, concentrated load. A theory is derived which is valid until initition of fracture in the structure. The presented experimental results show load...

  4. Prestressing Concrete with CFRP Composites for Sustainability and Corrosion-Free Applications

    Directory of Open Access Journals (Sweden)

    Belarbi A.

    2018-01-01

    Full Text Available Advancement in material science has enabled the engineers to enhance the strength and long-term behavior of concrete structures. The conventional approach is to use steel for prestressed bridge girders. Despite having good ductility and strength, beams prestressed with steel are susceptible to corrosion when subjected to environmental exposure. The corrosion of the prestressing steel reduces load carrying capacity of the prestressed member and result in catastrophic failures. In the last decades, more durable composite materials such as Aramid Fiber Reinforced Polymer (AFRP, Glass Fiber Reinforced Polymer (GFRP and Carbon Fiber Reinforced Polymer (CFRP have been implemented in concrete structures as a solution to this problem. Among these materials, CFRP stands out as a primary prestressing reinforcement, which has the potential to replace steel and provide corrosion free prestressed bridge girders. Despite its promise, prestressing CFRP has not frequently been used for bridge construction worldwide. The major contributing factor to the lack of advancement of this promising technology in the United States (U.S. is the lack of comprehensive design specifications. Apart from a limited number of guides, manuals, and commentaries, there is currently no standard or comprehensive design guideline available to bridge engineers in the U.S. for the design of concrete structures prestressed with CFRP systems. The main goal is to develop design guidelines in AASHTO-LRFD format for concrete bridge girders with prestressing CFRP materials. The guidelines are intended to address the limitation in current AASHTO-LRFD Bridge Design Specifications which is applicable for prestressed bridge girders with steel strands. To accomplish this goal, some of the critical parameters that affect the design and long-term behavior of prestressed concrete bridge girders with prestressing CFRP systems are identified and included in the research work. This paper presents

  5. Sensitivity and statistical analysis within the elaboration of steel plated girder resistance

    Czech Academy of Sciences Publication Activity Database

    Melcher, J.; Škaloud, Miroslav; Kala, Z.; Karmazínová, M.

    2009-01-01

    Roč. 5, č. 2 (2009), s. 120-126 ISSN 1816-112X. [International conf. on steel and aluminium structures /6./. Oxford, 24.06.2007-27.06.2007] Institutional research plan: CEZ:AV0Z20710524 Keywords : steel structures * fatigue * sensitivity * imperfection * plated girder Subject RIV: JM - Building Engineering

  6. Numerical Simulation of Vertical Random Vibration of Train-Slab Track-Bridge Interaction System by PEM

    Directory of Open Access Journals (Sweden)

    Zhi-ping Zeng

    2014-01-01

    Full Text Available The paper describes the numerical simulation of the vertical random vibration of train-slab track-bridge interaction system by means of finite element method and pseudoexcitation method. Each vehicle is modeled as four-wheelset mass-spring-damper system with two-layer suspension systems. The rail, slab, and bridge girder are modeled by three-layer elastic Bernoulli-Euler beams connected with each other by spring and damper elements. The equations of motion for the entire system are derived according to energy principle. By regarding rail irregularity as a series of multipoint, different-phase random excitations, the random load vectors of the equations of motion are obtained by pseudoexcitation method. Taking a nine-span simply supported beam bridge traveled by a train consisting of 8 vehicles as an example, the vertical random vibration responses of the system are investigated. Firstly, the suitable number of discrete frequencies of rail irregularity is obtained by numerical experimentations. Secondly, the reliability and efficiency of pseudoexcitation method are verified through comparison with Monte Carlo method. Thirdly, the random vibration characteristics of train-slab track-bridge interaction system are analyzed by pseudoexcitation method. Finally, applying the 3σ rule for Gaussian stochastic process, the maximum responses of train-slab track-bridge interaction system with respect to various train speeds are studied.

  7. Effect of Piers Shape on the Dynamic Structural Responses of Prestressed Concrete Bridge: Part II

    Directory of Open Access Journals (Sweden)

    Ali Fadhil Naser

    2016-03-01

    Full Text Available Pier of bridge is usually used as a general term for any type of substructure located between horizontal spans and foundations. Piers give vertical supports for spans at intermediate points and perform two main functions. The objective of this study is to inspect the effect of piers shape on the dynamic structural performance by adopting theoretical dynamic analysis. The results of dynamic analysis of 25 bridges models show that the maximum value of natural frequency is equal to 5.64Hz in two circles piers bridge model. Therefore, this type of model has good stiffness and bearing capacity. The two square piers model, the one circle pier model, and the two circles piers model appear good stiffness because of the natural frequencies (5.30Hz, 5.52Hz, and 5.64Hz are more than the maximum forced frequencies (4.52Hz, 5.45Hz, and 4.52Hz respectively. According to the comparison between all models results, the two circles piers model has the higher stiffness because of this model has the maximum value of natural frequency (5.64Hz and it is more than all forced vibration frequencies of all others models. Therefore, this study recommends that using the bridge model of two circles piers in the bridges construction that consists of three spans (30m+40m+30m with section of box girder.

  8. Effect of Piers Shape on the Dynamic Structural Responses of Prestressed Concrete Bridge: Part II

    Directory of Open Access Journals (Sweden)

    Ali Fadhil Naser

    2016-12-01

    Full Text Available Pier of bridge is usually used as a general term for any type of substructure located between horizontal spans and foundations. Piers give vertical supports for spans at intermediate points and perform two main functions. The objective of this study is to inspect the effect of piers shape on the dynamic structural performance by adopting theoretical dynamic analysis. The results of dynamic analysis of 25 bridges models show that the maximum value of natural frequency is equal to 5.64Hz in two circles piers bridge model. Therefore, this type of model has good stiffness and bearing capacity. The two square piers model, the one circle pier model, and the two circles piers model appear good stiffness because of the natural frequencies (5.30Hz, 5.52Hz, and 5.64Hz are more than the maximum forced frequencies (4.52Hz, 5.45Hz, and 4.52Hz respectively. According to the comparison between all models results, the two circles piers model has the higher stiffness because of this model has the maximum value of natural frequency (5.64Hz and it is more than all forced vibration frequencies of all others models. Therefore, this study recommends that using the bridge model of two circles piers in the bridges construction that consists of three spans (30m+40m+30m with section of box girder.

  9. Full Scale Test of a SSP 34m box girder 1. Data report

    DEFF Research Database (Denmark)

    Jensen, Find Mølholt; Branner, Kim; Nielsen, Per Hørlyk

    This report presents the setup and result of a full-scale test of a reinforced glass fibre/epoxy box girder used in 34m wind turbine blade. The tests were performed at the Blaest test facility in August 2006. The test is an important part of a research project established in cooperation between...... Risø DTU, the National Laboratory for Sustainable Energy at the Technical University of Denmark -, SSP-Technology A/S and Blaest (Blade test centre A/S) and it has been performed as a part of Find Mølholt Jensen‟s PhD study. This report contains the complete test data for the final test, in which...... the box girder was loaded until failure. A comprehensive description of the test setup is given. This report deals only with tests and results. There are no conclusions on the data in this report, but references are given to publications, where the data are used and compared with FEM etc. Various kinds...

  10. DYNAMIC BEHAVIOR OF TWO-SPAN CONTINUOUS CONCRETE BRIDGES UNDER MOVING OF HIGH-SPEED TRAINS

    Directory of Open Access Journals (Sweden)

    O. H. Marinichenko

    2017-10-01

    Full Text Available Purpose. The scientific work provides a comparison of the results of the movement of a high-speed passenger train across the bridge, obtained as a result of finite element modeling in the SAP2000 software package, and real tests of a double-span concrete railway bridge. Analysis of the rigid characteristics of flying structures. Methodology.The numerical method presented in this study shows valid results concerning the dynamic analysis of the behavior of bridges in conditions of high-speed train traffic. The factors influencing the dynamic behavior of bridges under moving loads, the influence of design parameters and rolling stock, as well as the interaction of the train and spans are determined. The system was used in the form of moving concentrated forces simulating the axes of the train. Findings. Maximum movements and accelerations were obtained as a result of the dynamic calculation for different speeds of the train and compared with practical tests. The correctness of the model of a span structure with regard to continuous ferroconcrete spans was verified. Originality. Within the framework of the work, the latest test results were used, including those with speeds calculated on the prospect of rail passenger traffic. For these tests, a model of a span structure was developed. Practical value. The results of the research can be used to plan the introduction of high-speed train traffic on existing and planned flying structures of reinforced concrete bridges. An approach to the design of span structures that will be effective when passing high-speed passenger trains is implemented.

  11. Magnetic-based NDE of steel in prestressed and post-tensioned concrete bridges

    Science.gov (United States)

    Ghorbanpoor, Al

    1998-03-01

    This paper addresses a study, funded by the Federal Highway Administration (FHWA), the U.S. Department of Transportation (DOT), that is currently underway at the University of Wisconsin-Milwaukee. The objective of the study is to develop an automated non-destructive testing system based on the magnetic flux leakage principle that would allow assessment of the condition of reinforcing and prestressing steels in concrete bridge components. Corrosion or cracking of steel within concrete members will be detected and evaluated. The system will be used as a self clamping and moving sensing device that can be installed on a concrete girder. Data from the sensing device is transmitted via a wireless communication system to data recording/analysis equipment on the ground. The sensing device may also be operated manually to allow inspection of local areas such as the end bearing or cable anchorage locations in cable bridges. Through performing a correlation analysis of recorded data, an assessment of the condition of the member under test is made. Reference data base for the correlation analysis is established through laboratory and field testing with known conditions.

  12. Stress Analysis for the Critical Metal Structure of Bridge Crane

    Science.gov (United States)

    Ling, Zhangwei; Wang, Min; Xia, Junfang; Wang, Songhua; Guo, Xiaolian

    2018-01-01

    Based on the type of connection between the main girder and end beam of electrical single beam crane, the finite element analysis model of a full portal crane was established. The stress distribution of the critical structure under different loading conditions was analyzed. The results shown that the maximum Mises stress and deflection of the main girder were within the allowable range. And the connecting location between end beam web and main girder had higher stress than other region, especially at the lower edge and upper edge of the end beam web and the area near the bolt hole of upper wing panel. Therefore it is important to inspect the connection status, the stress condition and the crack situation nearing connection location during the regular inspection process to ensure the safety of the connection between the main girder and end beam.

  13. Vertical gust response prediction of cable-stayed bridges in yawed wind; Shachokyo no shafu ni yoru enchoku gust oto no yosoku

    Energy Technology Data Exchange (ETDEWEB)

    Nakamura, S.; Nagamachi, K.; Kawai, Y. [Kawasaki Steel Corp., Tokyo (Japan); Kimura, K.; Fujino, Y. [The University of Tokyo, Tokyo (Japan). Faculty of Engineering; Tanaka, H.

    1996-03-01

    This paper outlines the vertical gust response analysis method in a yawed wind, gives an analytic example, and compares the experimental result with the analytic result to investigate the application of an analysis method and the validity of assumption and approximation. The vertical gust response to two cable-stayed bridges under construction in a yawed wind was predicted by applying assumption and approximation to the gust response prediction method in a yawed wind with the cantilever model having a plate cross-section manipulated. In this case, the wind velocity component perpendicular to the leading edge was defined as an effective wind velocity, and a bridge axis and the component perpendicular to a bridge axis were separately calculated in response. Moreover, some aerodynamic coefficients of a bridge girder cross-section were approximately obtained from the characteristics of the flat blades with same aspect ratio. The obtained analytic result was compared with the wind tunnel test result based on all bridge models. The result showed that the former almost coincides with the latter, the assumption and approximation of this time are verified in validity, and this analysis method can be used for cable-stayed bridges under construction. 10 refs., 7 figs., 2 tabs.

  14. Field performance of timber bridges. 4, Graves Crossing stress-laminated deck bridge

    Science.gov (United States)

    J. P. Wacker; M. A. Ritter

    The Graves Crossing bridge was constructed October 1991 in Antrim County, Michigan, as part of the demonstration timber bridge program sponsored by the USDA Forest Service. The bridge is a two-span continuous, stress-laminated deck superstructure and it is 36-ft long and 26-ft wide. The bridge is one of the first stress-laminated deck bridges to be built of sawn lumber...

  15. Estimation of Tsunami Bore Forces on a Coastal Bridge Using an Extreme Learning Machine

    Directory of Open Access Journals (Sweden)

    Iman Mazinani

    2016-04-01

    Full Text Available This paper proposes a procedure to estimate tsunami wave forces on coastal bridges through a novel method based on Extreme Learning Machine (ELM and laboratory experiments. This research included three water depths, ten wave heights, and four bridge models with a variety of girders providing a total of 120 cases. The research was designed and adapted to estimate tsunami bore forces including horizontal force, vertical uplift and overturning moment on a coastal bridge. The experiments were carried out on 1:40 scaled concrete bridge models in a wave flume with dimensions of 24 m × 1.5 m × 2 m. Two six-axis load cells and four pressure sensors were installed to the base plate to measure forces. In the numerical procedure, estimation and prediction results of the ELM model were compared with Genetic Programming (GP and Artificial Neural Networks (ANNs models. The experimental results showed an improvement in predictive accuracy, and capability of generalization could be achieved by the ELM approach in comparison with GP and ANN. Moreover, results indicated that the ELM models developed could be used with confidence for further work on formulating novel model predictive strategy for tsunami bore forces on a coastal bridge. The experimental results indicated that the new algorithm could produce good generalization performance in most cases and could learn thousands of times faster than conventional popular learning algorithms. Therefore, it can be conclusively obtained that utilization of ELM is certainly developing as an alternative approach to estimate the tsunami bore forces on a coastal bridge.

  16. Long-Term Vibration Monitoring of the Effects of Temperature and Humidity on PC Girders with and without Fly Ash considering ASR Deterioration

    Directory of Open Access Journals (Sweden)

    Tuan Minh Ha

    2017-01-01

    Full Text Available Structural responses have been used as inputs in the evaluation procedures of civil structures for years. Apart from the degradation of a structure itself, changes in the environmental conditions affect its characteristics. For adequate maintenance, it is necessary to quantify the environment-induced changes and discriminate them from the effects due to damage. This study investigates the variation in the vibration responses of prestressed concrete (PC girders, which were deteriorated because of the alkali–silica reaction (ASR, concerning ambient temperature and humidity. Three PC girders were exposed to outdoor weather conditions outside the laboratory, one of which had a selected amount of fly ash in its mixture to mitigate the ASR. The girders were periodically vibration tested for one and a half years. It was found that when the temperature and humidity increased, the frequencies and damping ratios decreased in proportion. No apparent variation in the mode shapes could be identified. A finite element model was proposed for numerical verification, the results of which were in good agreement with the measured changes in the natural frequencies. Moreover, the different dynamic performances of the three specimens indicated that the fly ash significantly affected the vibrations of the PC girders under ASR deterioration.

  17. Design and construction of PC cable-stayed bridge reducing the weight of dead load (Minamitabaru No. 1 Bridge). Shuko danmen no keiryoka wo hakatta PC shachokyo (kasho Minamitabaru 1 go kyo)

    Energy Technology Data Exchange (ETDEWEB)

    Otsuka, H. (Building Research Inst., Tokyo (Japan)); Ikari, K.; Ono, Y. (Ministry of Construction, Tokyo (Japan)); Hirano, A.

    1993-03-15

    The Minamitabaru No.1 bridge is a PC cable-stayed bridge with a 170m center span. The cross section dead load weight of the main beam in the center span is reduced to decrease the unbalance moment during construction and the negative reaction force after the completion. As a result, the average volume of concrete in the center span becomes 0.55m[sup 3]/m[sup 2] which is less by about 20% in comparison with a PC cable-stayed bridge of the similar scale. Separated 2 chamber box girder cross section is adopted for the shape of the main beam cross section to reduce the dead load weight of the cross section, and to improve the rigidity of the cross section and wind resisting stability, etc. In addition, a cross beam is provided in the diagonal member anchorage position to integrate the two box beams. A wind tunnel test is performed using a 1/30 scale model to confirm the wind resisting stability. The diagonal member is structured with several PC steel members. At the same time, a stretching work carriage is developed and used which can establish 3 dimensional position and direction by a hydraulic jack. 7 figs.

  18. Simplified Analytical Method for Optimized Initial Shape Analysis of Self-Anchored Suspension Bridges and Its Verification

    Directory of Open Access Journals (Sweden)

    Myung-Rag Jung

    2015-01-01

    Full Text Available A simplified analytical method providing accurate unstrained lengths of all structural elements is proposed to find the optimized initial state of self-anchored suspension bridges under dead loads. For this, equilibrium equations of the main girder and the main cable system are derived and solved by evaluating the self-weights of cable members using unstrained cable lengths and iteratively updating both the horizontal tension component and the vertical profile of the main cable. Furthermore, to demonstrate the validity of the simplified analytical method, the unstrained element length method (ULM is applied to suspension bridge models based on the unstressed lengths of both cable and frame members calculated from the analytical method. Through numerical examples, it is demonstrated that the proposed analytical method can indeed provide an optimized initial solution by showing that both the simplified method and the nonlinear FE procedure lead to practically identical initial configurations with only localized small bending moment distributions.

  19. Discussion on the installation checking method of precast composite floor slab with lattice girders

    Science.gov (United States)

    Chen, Li; Jin, Xing; Wang, Yahui; Zhou, Hele; Gu, Jianing

    2018-03-01

    Based on the installation checking requirements of China’s current standards and the international norms for prefabricated structural precast components, it proposed an installation checking method for precast composite floor slab with lattice girders. By taking an equivalent composite beam consisted of a single lattice girder and the precast concrete slab as the checking object, compression instability stress of upper chords and yield stress of slab distribution reinforcement at the maximum positive moment, tensile yield stress of upper chords, slab normal section normal compression stress and shear instability stress of diagonal bars at the maximum negative moment were checked. And the bending stress and deflection of support beams, strength and compression stability bearing capacity of the vertical support, shear bearing capacity of the bolt and compression bearing capacity of steel tube wall at the bolt were checked at the same time. Every different checking object was given a specific load value and load combination. Application of installation checking method was given and testified by example.

  20. Wind tunnel test on PC cable-stayed bridge; PC shachokyo no taifu seino shiken

    Energy Technology Data Exchange (ETDEWEB)

    Kubo, Y. [Kyushu Inst. of Technology, Kitakyushu (Japan). Faculty of Engineering

    1997-05-30

    This paper describes the wind tunnel test on a PC cable-stayed bridge. The aerodynamic force that acts on a building is represented by the drag that works in the wind direction, the lift that works perpendicularly to the wind direction, and the aerodynamic moment that causes rotation. In the measurement of wind load, a girder is partially extracted in the wind tunnel and set in a three-component balance, and the drag, lift, and aerodynamic moment are measured using a strain meter while blowing the wind. In a wind tunnel experiment, the similarity on Reynolds number, field number, rigidity, hydraulic force, structural attenuation, and reduced wind velocity is required. However, the wind velocity in the actual bridge uses the same air as that in an experiment. The similarity rule on the Reynolds is not thus satisfied. It is necessary to cause no self-excited vibration (galloping and flutter) as wind-resistant performance and suppress the eddy excitation to less than the allowable amplitude. Moreover, the three-dimensional experiment using an elastic model is conducted in addition to the two-dimensional experiment using a rigid model. In the three-dimensional experiment, various vibration modes that occur in the actual bridge appear. 12 refs., 15 figs.

  1. Estimation of hull girder vertical bending moments including non-linear and flexibility effects using closed form expressions

    DEFF Research Database (Denmark)

    Pedersen, Preben Terndrup; Jensen, Jørgen Juncher

    2009-01-01

    A simple but rational procedure for prediction of extreme wave-induced hull girder bending moment is presented. The procedure takes into account main ship hull characteristics such as: length, breadth, draught, block coefficient, bow flare coefficient, forward speed and hull flexibility. The wave......-linear strip theory calculations and supplemented with new closed form results for the hogging bending moment. Focus is on the extreme hull girder hogging bending moment. Due to the few input parameters this procedure can be used to estimate the wave-induced bending moments at the conceptual design phase....... Another application area is for novel single hull ship types not presently covered by the rules of the classification societies. As one application example the container ship M/S Napoli is considered....

  2. Influence of apparent wave velocity on seismic performance of a super-long-span triple-tower suspension bridge

    Directory of Open Access Journals (Sweden)

    Hao Wang

    2015-06-01

    Full Text Available As one of the main characteristics of seismic waves, apparent wave velocity has great influence on seismic responses of long-span suspension bridges. Understanding these influences is important for seismic design. In this article, the critical issues concerning the traveling wave effect analysis are first reviewed. Taizhou Bridge, the longest triple-tower suspension bridge in the world, is then taken as an example for this investigation. A three-dimensional finite element model of the bridge is established in ABAQUS, and the LANCZOS eigenvalue solver is employed to calculate the structural dynamic characteristics. Traveling wave effect on seismic responses of these long-span triple-tower suspension bridges is investigated. Envelopes of seismic shear force and moment in the longitudinal direction along the three towers, relative displacements between the towers and the girder, and reaction forces at the bottoms of the three towers under different apparent wave velocities are calculated and presented in detail. The results show that the effect of apparent wave velocity on the seismic responses of triple-tower suspension bridge fluctuates when the velocity is lower than 2000 m/s, and the effects turn stable when the velocity becomes larger. In addition, the effects of traveling wave are closely related to spectral characteristics and propagation direction of the seismic wave, and seismic responses of components closer to the source are relatively larger. Therefore, reliable estimation of the seismic input and apparent wave velocity according to the characteristics of the bridge site are significant for accurate prediction of seismic responses. This study provides critical reference for seismic analysis and design of long-span triple-tower suspension bridges.

  3. Cardiac transplantation after bridged therapy with continuous flow left ventricular assist devices.

    Science.gov (United States)

    Deo, Salil V; Sung, Kiick; Daly, Richard C; Shah, Ishan K; Altarabsheh, Salah E; Stulak, John M; Joyce, Lyle D; Boilson, Barry A; Kushwaha, Sudhir S; Park, Soon J

    2014-03-01

    Cardiac transplantation is an effective surgical therapy for end-stage heart failure. Patients (pts) may need to be bridged with a continuous flow left ventricular assist device (CF-LVAD) while on the transplant list as logistic factors like organ availability are unknown. Cardiac transplantation post-LVAD can be a surgically challenging procedure and outcome in these pts is perceived to be poorer based on experience with earlier generation pulsatile flow pumps. Data from a single institution comparing these pts with those undergoing direct transplantation in the present era of continuous flow device therapy are limited. Evaluate results of cardiac transplantation in pts bridged with a CF-LVAD (BTx) and compare outcomes with pts undergoing direct transplantation (Tx) in a single institution. From June 2007 till January 2012, 106 pts underwent cardiac transplantation. Among these, 37 (35%) pts (51±11 years; 85% male) were bridged with a CF-LVAD (BTx), while 70 (65%) comprised the Tx group (53±12 years; 72% males). The median duration of LVAD support was 227 (153,327) days. During the period of LVAD support, 10/37 (27%) pts were upgraded to status 1A and all were successfully transplanted. Median hospital stay in the BTx (14 days) was slightly longer than the Tx group (12 days) but not statistically significant (p=0.21). In-hospital mortality in the BTx (5%) and Tx (1%) were comparable (p=0.25). Estimated late survival in the BTx cohort was 94±7, 90±10 and 83±16% at the end of one, two and three years, respectively which was comparable to 97±4%, 93±6% and 89±9% for the Tx group (p=0.50). Cardiac transplantation after LVAD implant can be performed with excellent results. Patients can be supported on the left ventricular assist device even for periods close to a year with good outcome after cardiac transplantation. Copyright © 2013 Australian and New Zealand Society of Cardiac and Thoracic Surgeons (ANZSCTS) and the Cardiac Society of Australia and New Zealand

  4. Experimental assessment of an RFID-based crack sensor for steel structures

    Science.gov (United States)

    E Martínez-Castro, R.; Jang, S.; Nicholas, J.; Bansal, R.

    2017-08-01

    The use of welded steel cover plates had been a common design practice to increase beam section capacity in regions of high moment for decades. Many steel girder bridges with cover plates are still in service. Steel girder bridges are subject to cyclic loading, which can initiate crack formation at the toe of the weld and reduce beam capacity. Thus, timely detection of fatigue cracks is of utmost importance in steel girder bridge monitoring. To date, crack monitoring methods using in-house radio frequency identification (RFID)-based sensors have been developed to complement visual inspection and provide quantitative information of damage level. Offering similar properties at a reduced cost, commercial ultra-high frequency (UHF) passive RFID tags have been identified as a more financially viable option for pervasive crack monitoring using a dense array of sensors. This paper presents a study on damage sensitivity of low-cost commercial UHF RFID tags for crack detection and monitoring on metallic structures. Using backscatter power as a parameter for damage identification, a crack sensing system has been developed for single and multiple tag configurations for increased sensing pervasiveness. The effect on backscatter power of the existence and stage of crack propagation has been successfully characterized. For further automation of crack detection, a damage index based on the variation of backscatter power has also been established. The tested commercial RFID-based crack sensor contributes to the usage of this technology on steel girder bridges.

  5. Seismic Response Analysis of Continuous Multispan Bridges with Partial Isolation

    Directory of Open Access Journals (Sweden)

    E. Tubaldi

    2015-01-01

    Full Text Available Partially isolated bridges are a particular class of bridges in which isolation bearings are placed only between the piers top and the deck whereas seismic stoppers restrain the transverse motion of the deck at the abutments. This paper proposes an analytical formulation for the seismic analysis of these bridges, modelled as beams with intermediate viscoelastic restraints whose properties describe the pier-isolator behaviour. Different techniques are developed for solving the seismic problem. The first technique employs the complex mode superposition method and provides an exact benchmark solution to the problem at hand. The two other simplified techniques are based on an approximation of the displacement field and are useful for preliminary assessment and design purposes. A realistic bridge is considered as case study and its seismic response under a set of ground motion records is analyzed. First, the complex mode superposition method is applied to study the characteristic features of the dynamic and seismic response of the system. A parametric analysis is carried out to evaluate the influence of support stiffness and damping on the seismic performance. Then, a comparison is made between the exact solution and the approximate solutions in order to evaluate the accuracy and suitability of the simplified analysis techniques for evaluating the seismic response of partially isolated bridges.

  6. Environmental Durability of Reinforced Concrete Deck Girders Strengthened for Shear with Surface-Bonded Carbon Fiber-Reinforced Polymer

    Science.gov (United States)

    2009-05-01

    "This research investigated the durability of carbon fiber-reinforced polymer composites (CFRP) used for shear strengthening reinforced concrete deck girders. Large beams were used to avoid accounting for size effects in the data analysis. The effort...

  7. Field performance of timber bridges. 17, Ciphers stress-laminated deck bridge

    Science.gov (United States)

    James P. Wacker; James A. Kainz; Michael A. Ritter

    In September 1989, the Ciphers bridge was constructed within the Beltrami Island State Forest in Roseau County, Minnesota. The bridge superstructure is a two-span continuous stress-laminated deck that is approximately 12.19 m long, 5.49 m wide, and 305 mm deep (40 ft long, 18 ft wide, and 12 in. deep). The bridge is one of the first to utilize red pine sawn lumber for...

  8. An Optimization Algorithm for the Design of an Irregularly-Shaped Bridge Based on the Orthogonal Test and Analytic Hierarchy Process

    Directory of Open Access Journals (Sweden)

    Hanbing Liu

    2016-11-01

    Full Text Available Irregularly-shaped bridges are usually adopted to connect the main bridge and ramps in urban overpasses, which are under significant flexion-torsion coupling effects and in complicated stress states. In irregular-shaped bridge design, the parameters such as ramp radius, bifurcation diaphragm stiffness, box girder height, and supporting condition could affect structural performance in different manners. In this paper, the influence of various parameters on three indices, including maximum stress, the stress variation coefficient, and the fundamental frequency of torsional vibration, is investigated and analyzed based on orthogonal test method. Through orthogonal analysis, the major influence parameters and corresponding optimal values for these indices are achieved. Combining with the analytic hierarchy process (AHP, the hierarchical structure model of the multi-indices orthogonal test is established and a comprehensive weight analysis method is proposed to reflect the parameter influence on overall mechanical properties of an irregularly-shaped bridge. Influence order and optimal values of parameters for overall mechanical properties are determined based on the weight of factors and levels calculated by the comprehensive weight analysis method. The results indicate that the comprehensive weight analysis method is superior to the overall balance method, which verifies the effectiveness and accuracy of the comprehensive weight analysis in the parameter optimization of the multi-indices orthogonal test for an irregularly-shaped bridge. Optimal parameters obtained in this paper can provide reference and guidance for parameter control in irregularly-shaped bridge design.

  9. Automatic Bridge Control System

    OpenAIRE

    M. Niraimathi; S.Sivakumar; R.Vigneshwaran; R.Vinothkumar; P.Babu

    2012-01-01

    Bridge vibration control is an important issue whose purpose is to extend the structural service life of bridges. Normally, the bridge is modeled as an elastic beam or plate subject to a moving vehicle. However, the moving truck on a bridge is a complicated problem that must still be researched. In this paper, wepropose a new method, to overcome the huge load in the bridge a load cell is used at the entry which will monitor the load continuously at both ends. To escape from the heavy water fl...

  10. Failure Load Test of a CFRP Strengthened Railway Bridge in Oumlrnskoumlldsvik, Sweden

    DEFF Research Database (Denmark)

    Täljsten, Björn; Bergström, Markus; Carolin, Anders

    2009-01-01

    using carbon fiber reinforced polymer (CFRP) rectangular rods epoxy bonded in sawed up slots, e.g., near surface mounted reinforcement. The strengthening was very successful and resulted in a desired shear failure when the bridge was loaded to failure. The load-carrying capacity in bending...... steel reinforcement by approximately 10%, and increased the height of the compressed zone by 100 mm. When the shear failure occurred, the utilization of the compression concrete and CFRP rods were 100 and 87.5%, respectively. This indicates that a bending failure indeed was about to occur, even though......, Sweden is presented. In this particular test the shear capacity of the concrete girders was of primary interest. However, for any reasonable placement of the load (a line load placed transverse to the track direction) a bending failure would occur. This problem was solved by strengthening for flexure...

  11. Fatigue of cable anchorage of large cable stayed bridge; Daikibo shachokyo cable teichaku kozo no hiro

    Energy Technology Data Exchange (ETDEWEB)

    Endo, T.; Matsumoto, T. [Honshu-Shikoku Bridge Authority, Tokyo (Japan); Tsukahara, H. [Yokogawa Bridge Corp., Tokyo (Japan); Miki, C. [Tokyo Institute of Technology, Tokyo (Japan)

    1995-10-21

    Design considerations such as design schemes, the assemblage and welding of steel plates, and safety for fatigue of welded connections have to be taken for the cable anchorages of the steel cable stayed bridges. In this study, two full scale models, which have different shape of box anchorages welded to the web of the main girder, were made to investigate fatigue characteristics as well as assemblage of plate and gelding details. Finite element analyses for both test models and actual bridges here carried out to compare stress distribution. It was confirmed that the assemblage and welding of both types of box anchorage were attainable kith required quality and accuracy. According to the fatigue test, fatigue cracks originated from the weldings of the bearing plate to which the load from cable socket applied directly were caused by out-of-plane bending of the bearing plate. It was proved that the slight modifications of the details around the bearing plate resulted in sufficient fatigue strength in both types of anchorage. 1 ref., 23 figs., 2 tabs.

  12. Structural Impact of Construction Loads

    Science.gov (United States)

    2012-08-01

    Numerous bridge construction accidents have occurred across the country because of construction loadings, which are an underemphasized : topic in many DOT specifications and design manuals. Bridge girders are least stable when they are subjected to c...

  13. Solid Modeling and Finite Element Analysis of an Overhead Crane Bridge

    Directory of Open Access Journals (Sweden)

    C. Alkin

    2005-01-01

    Full Text Available The design of an overhead crane bridge with a double box girder has been investigated and a case study of a crane with 35 ton capacity and 13 m span length has been conducted. In the initial phase of the case study, conventional design calculations proposed by F. E. M. Rules and DIN standards were performed to verify the stress and deflection levels. The crane design was modeled using both solids and surfaces. Finite element meshes with 4-node tetrahedral and 4-node quadrilateral shell elements were generated from the solid and shell models, respectively. After a comparison of the finite element analyses, the conventional calculations and performance of the existing crane, the analysis with quadratic shell elements was found to give the most realistic results. As a result of this study, a design optimization method for an overhead crane is proposed. 

  14. Maintained ship hull girder ultimate strength reliability considering corrosion and fatigue

    DEFF Research Database (Denmark)

    Hu, Yong; Cui, W.; Pedersen, Preben Terndrup

    2004-01-01

    The prupose of this paper is to propose a methodology to assess the time-variant ultimate strength of ship hull girder under the degradations of corrosion and fatigue. The effects of fatigue cracks on the tensile and compressive residual ultimate strength of stiffened panels and unstiffened plates......, webs and flanges, respectively. The effects of inspections and repair are taken into account. A minimum net thickness rule is used to determine repair policies. A procedure is proposed to determine the maximum allowable corrosion thickness of different parts of the hull cross section. The procedure...

  15. Field performance of timber bridges. 12, Christian Hollow stress-laminated box-beam bridge

    Science.gov (United States)

    J. P. Wacker; S. C. Catherman; R. G. Winnett

    In January 1992, the Christian Hollow bridge was constructed in Steuben County, New York. The bridge is a single-span, stress-laminated box-beam superstructure that is 9.1 m long, 9.8 m wide, and 502 mm deep (30 ft long, 32 ft wide, and 19-3/4 in. deep). The performance of the bridge was continuously monitored for 28 months, beginning shortly after installation....

  16. Reflective Cracking between Precast Prestressed Box Girders

    Science.gov (United States)

    2017-06-30

    The adjacent precast prestressed concrete box-beam bridge is the bridge of choice for short and short-to-medium span bridges. This choice is because of the ease of construction, favorable span-to-depth ratios, aesthetic appeal, and high torsional sti...

  17. A Study of the Bolt Connection System for a Concrete Barrier of a Modular Bridge

    Directory of Open Access Journals (Sweden)

    Doo-Yong Cho

    2018-04-01

    Full Text Available Modular technology has been recently studied to reduce the construction periods in the field of bridge construction. However, this method is restricted to the pier, girder, and deck, which are the main members of a bridge, and incidental facilities such as concrete barriers have been rarely studied. Thus, in this study, the connection system of a concrete barrier for modular bridges was developed, and a static loading experiment was performed to verify the structural capacity of the proposed system. The variables of the experiment were the vertical and horizontal bolt connections and the construction method. The barrier and plate were fabricated using match casting methods in which nuts were first inserted into the plates rather than anchor bolts using the conservative method. Moreover, a comparison with the conventional in situ barrier was also performed. The experiments were conducted according to the AASHTO LRFD standard. Consequently, the specimen using the vertical bolt connection had a structural capacity that was equal to 85% of that of the conventional specimen and exhibited similar crack patterns compared with the conventional specimen. In the case of the horizontal bolt connection, the separation in the connection area occurred with the application of the initial load and this specimen exhibited a poor performance because of the increase in the separation distance with the application of the maximum load.

  18. On the Effect of Hull Girder Flexibility on the Vertical Wave Bending Moment for Ultra Large Container Vessels

    DEFF Research Database (Denmark)

    Andersen, Ingrid Marie Vincent; Jensen, Jørgen Juncher

    2012-01-01

    Currently, a number of very large container ships are being built and more are on order, and some concerns have been expressed about the importance of the reduced hull girder stiffness to the wave-induced loads. The main concern is related to the fatigue life, but also a possible increase...... in the global hull girder loads as consequence of the increased hull flexibility must be considered. This is especially so as the rules of the classification societies do not explicitly account for the effect of hull flexibility on the global loads. In the present paper an analysis has been carried out...... in the waves. Slamming forces are determined by a standard momentum formulation. The hull flexibility is modelled as a nonprismatic Timoshenko beam. Generally, good agreement with experimental results and more accurate numerical predictions has previously been obtained in a number of studies. The statistical...

  19. Field performance of timber bridges. 13, Mohawk Canal stress-laminated bridge

    Science.gov (United States)

    P. D. Hilbrich Lee; X. Lauderdale

    The Mohawk Canal bridge was constructed in August 1994, just outside Roll, Arizona. It is a simple-span, double-lane, stress-laminated deck superstructure, approximately 6.4 m (21 ft) long and 10.4 m (34 ft) wide and constructed with Combination 16F-V3 Douglas Fir glued-laminated timber beam laminations. The performance of the bridge was monitored continuously for 2...

  20. Bridges Dynamic Parameters Identification Based On Experimental and Numerical Method Comparison in Regard with Traffic Seismicity

    Science.gov (United States)

    Krkošková, Katarína; Papán, Daniel; Papánová, Zuzana

    2017-10-01

    The technical seismicity negatively affects the environment, buildings and structures. Technical seismicity means seismic shakes caused by force impulse, random process and unnatural origin. The vibration influence on buildings is evaluated in the Eurocode 8 in Slovak Republic, however, the Slovak Technical Standard STN 73 0036 includes solution of the technical seismicity. This standard also classes bridges into the group of structures that are significant in light of the technical seismicity - the group “U”. Using the case studies analysis by FEM simulation and comparison is necessary because of brief norm evaluation of this issue. In this article, determinate dynamic parameters by experimental measuring and numerical method on two real bridges are compared. First bridge, (D201 - 00) is Scaffold Bridge on the road I/11 leading to the city of Čadca and is situated in the city of Žilina. It is eleven - span concrete road bridge. The railway is the obstacle, which this bridge spans. Second bridge (M5973 Brodno) is situated in the part of Žilina City on the road of I/11. It is concrete three - span road bridge built as box girder. The computing part includes 3D computational models of the bridges. First bridge (D201 - 00) was modelled in the software of IDA Nexis as the slab - wall model. The model outputs are natural frequencies and natural vibration modes. Second bridge (M5973 Brodno) was modelled in the software of VisualFEA. The technical seismicity corresponds with the force impulse, which was put into this model. The model outputs are vibration displacements, velocities and accelerations. The aim of the experiments was measuring of the vibration acceleration time record of bridges, and there was need to systematic placement of accelerometers. The vibration acceleration time record is important during the under - bridge train crossing, about the first bridge (D201 - 00) and the vibration acceleration time domain is important during deducing the force

  1. Strain features and condition assessment of orthotropic steel deck cable-supported bridges subjected to vehicle loads by using dense FBG strain sensors

    Science.gov (United States)

    Wei, Shiyin; Zhang, Zhaohui; Li, Shunlong; Li, Hui

    2017-10-01

    Strain is a direct indicator of structural safety. Therefore, strain sensors have been used in most structural health monitoring systems for bridges. However, until now, the investigation of strain response has been insufficient. This paper conducts a comprehensive study of the strain features of the U ribs and transverse diaphragm on an orthotropic steel deck and proposes a statistical paradigm for crack detection based on the features of vehicle-induced strain response by using the densely distributed optic fibre Bragg grating (FBG) strain sensors. The local feature of strain under vehicle load is highlighted, which enables the use of measurement data to determine the vehicle loading event and to make a decision regarding the health status of a girder near the strain sensors via technical elimination of the load information. Time-frequency analysis shows that the strain contains three features: the long-term trend item, the short-term trend item, and the instantaneous vehicle-induced item (IVII). The IVII is the wheel-induced strain with a remarkable local feature, and the measured wheel-induced strain is only influenced by the vehicle near the FBG sensor, while other vehicles slightly farther away have no effect on the wheel-induced strain. This causes the local strain series, among the FBG strain sensors in the same transverse locations of different cross-sections, to present similarities in shape to some extent and presents a time delay in successive order along the driving direction. Therefore, the strain series induced by an identical vehicle can be easily tracked and compared by extracting the amplitude and calculating the mutual ratio to eliminate vehicle loading information, leaving the girder information alone. The statistical paradigm for crack detection is finally proposed, and the detection accuracy is then validated by using dense FBG strain sensors on a long-span suspension bridge in China.

  2. Dynamic Magnification Factor in a Box-Shape Steel Girder

    Science.gov (United States)

    Rahbar-Ranji, A.

    2014-01-01

    The dynamic effect of moving loads on structures is treated as a dynamic magnification factor when resonant is not imminent. Studies have shown that the calculated magnification factors from field measurements could be higher than the values specified in design codes. It is the main aim of present paper to investigate the applicability and accuracy of a rule-based expression for calculation of dynamic magnification factor for lifting appliances used in marine industry. A steel box shape girder of a crane is considered and transient dynamic analysis using computer code ANSYS is implemented. Dynamic magnification factor is calculated for different loading conditions and compared with rule-based equation. The effects of lifting speeds, acceleration, damping ratio and position of cargo are examined. It is found that rule-based expression underestimate dynamic magnification factor.

  3. Integral Abutment and Jointless Bridges

    Directory of Open Access Journals (Sweden)

    Cristian-Claudiu Comisu

    2005-01-01

    Full Text Available Integral bridges, or integral abutment and jointless bridges, as they are more commonly known in the USA, are constructed without any movement joints between spans or between spans and abutments. Typically these bridges have stub-type abutments supported on piles and continuous bridge deck from one embankment to the other. Foundations are usually designed to be small and flexible to facilitate horizontal movement or rocking of the support. Integrally bridges are simple or multiple span ones that have their superstructure cast integrally with their substructure. The jointless bridges cost less to construct and require less maintenance then equivalent bridges with expansion joints. Integral bridges present a challenge for load distribution calculations because the bridge deck, piers, abutments, embankments and soil must all be considered as single compliant system. This paper presents some of the important features of integral abutment and jointless bridge design and some guidelines to achieve improved design. The goal of this paper is to enhance the awareness among the engineering community to use integral abutment and jointless bridges in Romania.

  4. FIP Symposium 1997 (South Africa); FIP Symposium 1997 (Minami Africa) ni sankashite

    Energy Technology Data Exchange (ETDEWEB)

    Niwano, T. [Oriental Construction Co. Ltd., Tokyo (Japan); Shinagawa, K.; Takahashi, T.

    1997-07-31

    FIP (Federation Internationale de la Precontrainte) Symposium was held in Johannesburg, South Africa. Ikeda and others were sent by the Japan Prestressed Concrete Engineering Association to participate the symposium and visit some bridges in Hong Kong and South Africa. As the keynote addresses, the trends of PC in South Africa, Europe, America, East Asia and Australia was reported. Japanese papers among 105 presented papers are as follows: Iwasaki`s `Construction method of the railway PC skew slab bridge, Natori-Gawa bridge`, Toda`s `Construction of the suspended slab bridge longest in the world, Yume Tsuri-bashi`, Iizuka`s `Experiment on earthquake characteristics of precast concrete columns` and Sugita`s `Study on concrete using high-activity rice hull ash`. The group visited Kap Shui Mun bridge (Hong Kong) of 750m long constructed by Japanese JV which is the 5-span continuous complex cable stayed bridge, and featured by PC box girder structure of side spans. The group also visited Gouritz River PC bridge in South Africa. 5 refs., 10 figs.

  5. Experimental investigation on FRP to steel adhesively-bonded joint under tensile loading

    NARCIS (Netherlands)

    Jiang, X.; Kolstein, M.H.; Bijlaard, F.S.K.

    2012-01-01

    Due to various advantages of Fibre-Reinforced Polymer (FRP) decks, the FRP to steel composite girder system is being increasingly used in the construction of new bridges as well as the rehabilitation projects of old bridges. This paper focus on the mechanical behaviors and failure modes of the

  6. Numerical investigation of the bearing capacity of transversely prestressed concrete deck slabs

    NARCIS (Netherlands)

    Amir, S.; Van der Veen, C.; Walraven, J.C.; De Boer, A.

    2014-01-01

    The research subject of this paper is the bearing capacity of transversely prestressed concrete bridge decks between concrete girders under concentrated loads. Experiments on a 1:2 scale model of this bridge were carried out in the laboratory and a 3D nonlinear finite element model was developed in

  7. Vehicle - Bridge interaction, comparison of two computing models

    Science.gov (United States)

    Melcer, Jozef; Kuchárová, Daniela

    2017-07-01

    The paper presents the calculation of the bridge response on the effect of moving vehicle moves along the bridge with various velocities. The multi-body plane computing model of vehicle is adopted. The bridge computing models are created in two variants. One computing model represents the bridge as the Bernoulli-Euler beam with continuously distributed mass and the second one represents the bridge as the lumped mass model with 1 degrees of freedom. The mid-span bridge dynamic deflections are calculated for both computing models. The results are mutually compared and quantitative evaluated.

  8. Application of grey system theory to construction control for prestressed concrete continuous bridge

    NARCIS (Netherlands)

    Yu, Q.; Lu, Zhean; Wang, Juanjuan

    2006-01-01

    Text in Chinese. - This paper discussed the application of the grey system theory for the construction control of bridges on the background of the construction of Fuhe Bridge in Huangpi county, Hubei province. The GM( 1,1) model was the most representative and widely applied grey prognosticate model

  9. Rating precast prestressed concrete bridges for shear

    Science.gov (United States)

    2008-12-01

    Shear capacity of real-world prestressed concrete girders designed in the 1960s and 1970s is a concern because : AASHTO Standard Specifications (AASHTO-STD) employed the quarter-point rule for shear design, which is less : conservative for shea...

  10. The effect of switching cracks on the vibration of a continuous beam bridge subjected to moving vehicles

    Science.gov (United States)

    Fu, Chunyu

    2015-03-01

    During the service life of bridges, cracks can easily occur due to the dynamic loadings acting on them. These cracks may seriously affect the safety and serviceability of the bridges. Thus, this paper investigates the effect of these cracks on the vibration of a continuous beam bridge subjected to moving vehicles. The cracks are simulated by switching cracks, which can open and close fully instantaneously, and the beam behavior is considered as a sequence of linear states, each of which can be evaluated through a modal analysis. Special attention is paid to the analysis of the instant of crack switching, the linkage point of two adjacent linear states. The mode shapes and equation of motion corresponding to the new state after the switching are determined first. Next, the responses at the switching instant are recalculated. Finally, the beam displacement can be obtained by taking these responses as the initial condition. A numerical method is applied to investigate the validity of the proposed method, and the results show that the crack switching can result in higher accelerations, alter the slopes of the modal contributions to the displacement, and produce a new peak in the displacement history. During the resonance caused by a series of vehicles, the switching can reduce the first modal contribution to the resonance, but increase the second modal contribution. As a result, the resonant amplitude becomes smaller and the resonant mode changes.

  11. Simple model of cable-stayed bridge deck subjected to static wind loading

    Science.gov (United States)

    Kang, Yi-Lung; Wang, Yang Cheng

    1997-05-01

    Cable-stayed bridges have been known since 18th century with aesthetics design. The structural system and the structural behavior are significantly different from those of continuous bridges. Compared to continuous bridge, cable- stayed bridges have more flexure bridge deck than those of continuous bridges.On the other hand, cable-stayed bridges have less stiffness to resist wind loading especially for lateral loads. The first considering of bridge engineering is safety. In 1940's, Tacoma Narrows Suspension Bridge destroyed by wind loading is a good example even though it is not a cable-stayed bridge. After the bridge was destroyed, a lot of research articles have been published regarding cable supported bridge subjected to wind loading. In recent days, high strength materials have been served. The bridge engineers use the advantages to expand the span length of cable-stayed bridges. Due to the span length increased and the use of high strength materials, cable- stayed bridges have more significant nonlinear behavior subjected to wind loading. In this paper, a slice bridge deck of cable-stayed bridge connected to internal support cables is considered. The deck has been considered to be subjected to lateral static wind loading. Since cables can not take compressive force, the deck has strongly nonlinear behavior even though the materials are linear elastic. Several primary load combinations have ben considered in this paper such as the bridge deck supposed to be moved horizontally without rotation or the bridge deck supposed to be moved horizontally with rotational deformation. The mathematical formulas and the numerical solutions are found and represented in graphical forms. The results can be provided to bridge designers and researchers for further study of this type of structure subjected to wind loading.

  12. Performance evaluation of corrosion-affected reinforced concrete ...

    Indian Academy of Sciences (India)

    M B Anoop

    Abstract. A methodology for performance evaluation of reinforced concrete bridge girders in corrosive ... concrete (RC) members of infrastructural systems, espe- ... bility will be useful for making engineering decisions for ...... Water-cement ratio.

  13. Data collection and evaluation of continuity detail for John James Audubon Bridge No. 61390613004101.

    Science.gov (United States)

    2014-10-01

    This report summarizes findings from monitoring data that was collected over a two-year period from Bridge No. : 61390613004101 in the John James Audubon Project, which was formerly designated as Bridge #2 prior to : construction completion. The brid...

  14. Rapid multichannel impact-echo scanning of concrete bridge decks from a continuously moving platform

    Science.gov (United States)

    Mazzeo, Brian A.; Larsen, Jacob; McElderry, Joseph; Guthrie, W. Spencer

    2017-02-01

    Impact-echo testing is a non-destructive evaluation technique for determining the presence of defects in reinforced concrete bridge decks based on the acoustic response of the bridge deck when struck by an impactor. In this work, we build on our prior research with a single-channel impactor to demonstrate a seven-channel impact-echo scanning system with independent control of the impactors. This system is towed by a vehicle and integrated with distance measurement for registering the locations of the impacts along a bridge deck. The entire impact and recording system is computer-controlled. Because of a winch system and hinged frame construction of the apparatus, setup, measurement, and take-down of the apparatus can be achieved in a matter of minutes. Signal processing of the impact responses is performed on site and can produce a map of delaminations immediately after data acquisition. This map can then be used to guide other testing and/or can be referenced with the results of other testing techniques to facilitate comprehensive condition assessments of concrete bridge decks. This work demonstrates how impact-echo testing can be performed in a manner that makes complete bridge deck scanning for delaminations rapid and practical.

  15. Study on the Spatial Stress of the Chongqing Yangtze River Bridge in China

    Directory of Open Access Journals (Sweden)

    Yan Li

    2014-09-01

    Full Text Available Continuous rigid-frame bridges are usually used in building bridges with long span and high piers. It is characterized by the consolidation between piers and beams in the middle of bridge piers and flexible bridge piers in the lower part. Among all the factors, curvature has the most obvious influence on the stress of curved continuous rigid-frame bridge, because of which, the curved beam bridge produces coupling effect of bending moment and receives complicated stress, leading to the deformation such as torsion and displacement of radial direction. No matter it is the castscaffold construction or cantilever construction, for continuous rigid-frame bridges, considering that after the long term creep of concrete, structure stress tends to be in a drop-frame state, so it is necessary to know the mechanical properties of the finished bridge. Taking the Chongqing Yangtze River Bridge as an example, this paper mainly analyzes the internal forces and deformations of a finished curved continuotus rigid-frame bridge by establishing a spatial finite element model with Midas Civil 2006 software and by changing the model’s radius of curvature. The results show that as the curvature increases, the vertical deformation and torsion angle of the long-span curved continuous rigid-frame bridge are both reduced under the effect of a dead load and prestressed load, presenting mechanical properties of bridge, namely, “coupling effect of bending moment”. In the model analyzed, the deformation of the bridge in the transverse direction also behaves a trend of gradual decrease with an increase in radius of curvature with the range 500–2000 m.

  16. Effects of ambient temperature changes on integral bridges.

    Science.gov (United States)

    2008-09-01

    Integral bridges (IBs) are jointless bridges whereby the deck is continuous and monolithic with abutment walls. IBs are outperforming their non-integral counterparts in economy and safety. Their principal advantages are derived from the absence of ex...

  17. Extracorporeal Life Support Bridge to Ventricular Assist Device: The Double Bridge Strategy.

    Science.gov (United States)

    Marasco, Silvana F; Lo, Casey; Murphy, Deirdre; Summerhayes, Robyn; Quayle, Margaret; Zimmet, Adam; Bailey, Michael

    2016-01-01

    In patients requiring left ventricular assist device (LVAD) support, it can be difficult to ascertain suitability for long-term mechanical support with LVAD and eventual transplantation. LVAD implantation in a shocked patient is associated with increased morbidity and mortality. Interest is growing in the utilization of extracorporeal life support (ECLS) as a bridge-to-bridge support for these critically unwell patients. Here, we reviewed our experience with ECLS double bridging. We hypothesized that ECLS double bridging would stabilize end-organ dysfunction and reduce ventricular assist device (VAD) implant perioperative mortality. We conducted a retrospective review of prospectively collected data for 58 consecutive patients implanted with a continuous-flow LVAD between January 2010 and December 2013 at The Alfred Hospital, Melbourne, Victoria, Australia. Twenty-three patients required ECLS support pre-LVAD while 35 patients underwent LVAD implantation without an ECLS bridge. Preoperative morbidity in the ECLS bridge group was reflected by increased postoperative intensive care duration, blood loss, blood product use, and postoperative renal failure, but without negative impact upon survival when compared with the no ECLS group. ECLS stabilization improved end-organ function pre-VAD implant with significant improvements in hepatic and renal dysfunction. This series demonstrates that the use of ECLS bridge to VAD stabilizes end-organ dysfunction and reduces VAD implant perioperative mortality from that traditionally reported in these "crash and burn" patients. Copyright © 2015 International Center for Artificial Organs and Transplantation and Wiley Periodicals, Inc.

  18. 21 CFR 872.3770 - Temporary crown and bridge resin.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Temporary crown and bridge resin. 872.3770 Section... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Prosthetic Devices § 872.3770 Temporary crown and bridge resin. (a) Identification. A temporary crown and bridge resin is a device composed of a material, such as...

  19. Predicting camber, deflection, and prestress losses in prestressed concrete members.

    Science.gov (United States)

    2011-07-01

    Accurate predictions of camber and prestress losses for prestressed concrete bridge girders are essential to minimizing the frequency and cost of construction problems. The time-dependent nature of prestress losses, variable concrete properties, and ...

  20. Appendix G : end region design models.

    Science.gov (United States)

    2013-03-01

    The 2007 AASHTO LRFD Bridge Design Specifications contain prescriptive : requirements for the quantity and placement of confinement reinforcement located in the bottom : flange of pretensioned concrete I-girders. This chapter proposes a rational mode...

  1. Fatigue strength of the joint between diaphragms and longitudinal ribs in box section girders; Hako danmen keta no diaphragm to shita flange tateribu no kosabu no hiro kyodo

    Energy Technology Data Exchange (ETDEWEB)

    Miki, C.; Shiozaki, M.; Takeishi, K. [Tokyo Institute of Technology, Tokyo (Japan). Faculty of Engineering; Ohashi, H. [Honshu-Shikoku Bridge Authority, Tokyo (Japan)

    1997-04-21

    Discussions were given on crossing joints of diaphragms on hanger fixing sections and U-ribs on lower flanges in reinforcing box girders of a suspension bridge, as to their local stress generating behavior and effects of cope holes on fatigue strength. The test pieces have dimensions and shapes modeling the crossing joints, and the steel materials are SM490YA for upper and lower flanges and webs, and SS400 for U-ribs. The loading test was performed with four-point bending and at loading amplitudes of 30 to 45 tf. Furthermore, stress analysis was conducted by using the finite element method. The following conclusions were obtained as a result: local stress at cope hole tips decreases and fatigue strength increases with the smaller the cope hole diameter; when the cope holes are back-filled completely, deformation is concentrated on welds of the U-ribs and the flanges, generating high local stress; this reduces significantly the fatigue strength of details having no cope holes; and no particular differences are found on effects of boxing of the cope hole tips on the fatigue strength. 7 refs., 10 figs., 3 tabs.

  2. Determination method of optimum pre-stress in cables of cable-stayed bridges by using fuzzy sets theory; Fuzzy riron wo mochiita shachokyo cable no saiteki prestress chikara ketteiho

    Energy Technology Data Exchange (ETDEWEB)

    Furuta, H. [Kansai Univ., Osaka (Japan); Kaneyoshi, M.; Tanaka, H. [Hitachi Zosen Corp., Osaka (Japan); Kamei, M.

    1996-06-20

    Generally in cable-stayed bridges, optimum pre-stress is introduced into cables to achieve reducing weight of the cable cross section by reducing and equalizing the cross sectional force of the main girders. However, the conventional optimum stress determining methods require setting the cross section to be repeated. Therefore, in order to omit iterative calculations and derive rational pre-stress, a fuzzy sets theory was introduced. With this method, if upper and lower limits of design values (targeted design values) are inputted, which are desired by a designer to be realized as cross sectional force such as in main girders and towers and cable tension, an optimum stress can be derived automatically by means of a fuzzy linearity regression analysis. The targeted design values are given by experience and engineering judgment, and resetting the cross section is not required as long as a target value which can be tolerated by a hypothetical cross section is given. Since the theory used is a fuzzy sets theory, the derived pre-stress may not be guaranteed as a truly optimum pre-stress. In order to have the result approach an optimum solution, it is important to set adequate upper and lower limits of the targeted design values referring to examples of constructions in the past and experience. 10 refs., 11 figs., 7 tabs.

  3. A quadcopter with heterogeneous sensors for autonomous bridge inspection.

    Science.gov (United States)

    2014-02-01

    Continuously monitoring a bridges health by sensor technologies has been widely used to maintain the operation of : a : roadwork while protecting public users safety. However, monitoring and inspecting numerous bridges in a state is a labor : -...

  4. Structural health monitoring of the Gröndals Bridge in Sweden: the behaviour of CFRP strengthening in cold temperature

    Science.gov (United States)

    Hejll, Arvid; Täljsten, Björn; Carolin, Anders

    2006-03-01

    To obtain a better knowledge of existing structures behaviour monitoring can be used. The use of monitoring in bridge structures by the use of instruments to assess the integrity of structures is not new and there are reports from structures tested as early as in the 19th century according to ISIS Canada1 However, the term SHM (Structural Health Monitoring) is relatively new to civil engineering and the driving force to implement SHM comes from recognising the limitations of conventional visual inspections and evaluations using conservative codes of practice. The possibilities to monitor existing structures with help of the rapidly evolving Information Technology are to day carried out. The objective of SHM is to monitor the in-situ behaviour of a structure accurately and efficiently, to assess its performance under various service conditions, to detect damage or deterioration, and to determine the health or condition of the structure1. In Sweden strengthening and periodic monitoring of a large freivorbau bridge (pre-stresed concrete box girder bridge) has been carried out, the Gröndals Bridge. The bridge is located in Stockholm and is approximately 400 m in length with a free span of 120 m. It was opened to tram traffic in year 2000. Just after opening cracks were noticed in the webs, these cracks have then increased, the size of the largest cracks exceeded 0.5 mm, and at the end of year 2001 the bridge was temporarily strengthened. This was carried out with externally placed prestressed steel stays. The reason for cracking is quite clear but the responsibility is still debated. Nevertheless, it was evidently that the bridge needed to be strengthened. The strengthening methods used were CFRP plates in the Service Limit State (SLS) and prestressed dywidag stays in the Ultimate Limit State (ULS). The strengthening was carried out during year 2002. At the same time monitoring of the bridge commenced, using LVDT crack gauges as well as optical fibre sensors. This

  5. SOLUTION FOR AN EQUIPMENT OF RAILWAY BRIDGE MONITORING

    Directory of Open Access Journals (Sweden)

    Liviu Mihai SIMA

    2009-11-01

    Full Text Available This paper presents a solution for the railway bridges monitoring based on the use of already existing equipments in the railway installations and some new equipments based on photo-elements, as well. This kind of equipments can function in continue and discontinuous regime, means of them tracking down if the bridge piles suffered movements by different reasons. This aspect can put in danger the safety of the circulation on that bridge.

  6. Measurements in a container ship of wave-induced hull girder stresses in excess of design values

    DEFF Research Database (Denmark)

    Andersen, Ingrid Marie Vincent; Jensen, Jørgen Juncher

    2014-01-01

    This paper describes full-scale measurements of the wave-induced vertical bending moment amidships a 9400 TEU container carrier and focuses on the effect of the hydro-elastic high-frequency vibration on the extreme hogging wave bending moment. One extreme event, where the vertical wave-induced ho...... is quite significant. Finally, the hydro-elastic behaviour of the hull girder is assessed by simple approximations using the measured statistical properties and closed-form expressions and the agreement with the actual measurements is found to be good. © 2014 Elsevier Ltd....

  7. Efficient field testing for load rating railroad bridges

    Science.gov (United States)

    Schulz, Jeffrey L.; Brett C., Commander

    1995-06-01

    As the condition of our infrastructure continues to deteriorate, and the loads carried by our bridges continue to increase, an ever growing number of railroad and highway bridges require load limits. With safety and transportation costs at both ends of the spectrum. the need for accurate load rating is paramount. This paper describes a method that has been developed for efficient load testing and evaluation of short- and medium-span bridges. Through the use of a specially-designed structural testing system and efficient load test procedures, a typical bridge can be instrumented and tested at 64 points in less than one working day and with minimum impact on rail traffic. Various techniques are available to evaluate structural properties and obtain a realistic model. With field data, a simple finite element model is 'calibrated' and its accuracy is verified. Appropriate design and rating loads are applied to the resulting model and stress predictions are made. This technique has been performed on numerous structures to address specific problems and to provide accurate load ratings. The merits and limitations of this approach are discussed in the context of actual examples of both rail and highway bridges that were tested and evaluated.

  8. Appendix C : SR-72 tests.

    Science.gov (United States)

    2013-03-01

    The Florida highway system includes some of the earliest (circa 1950s) pretensioned : concrete bridges in the United States. Shear capacity of Floridas early pretensioned girders is of : interest because the early designs had thin webs and only li...

  9. Self-compacting concrete for prestressed bridge girders

    Science.gov (United States)

    Erkmen, Bulent

    The purpose of this study was to examine social mobility as a motivation for first-generation college students in reaching attainment at two-year technical colleges. The research question was to what degree has the perception of social mobility influenced first generation college students at technical colleges to complete their career educational goals. Graduates of a two-year technical college were asked a series of open-ended questions regarding their past experiences and perceptions of attending and completing a two-year technical college program; their childhood perceptions of their social status; and experiences with family members regarding their change in social class status. These questions were designed to determine their feelings, viewpoints, reflections, experiences, struggles, and thoughts about attainment (completing their post-secondary education) and the extent to which social mobility influenced their decision to complete their education. The benefits of this research include an understanding of social mobility and educational attainment. Results of this study could be used to better understand the process that first generation college students go through in order to attain their educational goals. The information from this study may be useful for technical college administrations to help design programs and processes for future first-generation college students' success and aid in retention of these students.

  10. Towards a real-time Structural Health Monitoring of railway bridges

    OpenAIRE

    Vagnoli, Matteo; Remenyte-Prescott, Rasa; Andrews, John

    2017-01-01

    More than 350,000 railway bridges are present on the European railway network, making them a key infrastructure of the whole railway network. Railway bridges are continuously exposed to changing environmental threats, such as wind, floods and traffic load, which can affect safety and reliability of the bridge. Furthermore, a problem on a bridge can affect the whole railway network by increasing the vulnerability of the geographic area, served by the railway network. In this paper a Bayesian B...

  11. A data management infrastructure for bridge monitoring

    Science.gov (United States)

    Jeong, Seongwoon; Byun, Jaewook; Kim, Daeyoung; Sohn, Hoon; Bae, In Hwan; Law, Kincho H.

    2015-04-01

    This paper discusses a data management infrastructure framework for bridge monitoring applications. As sensor technologies mature and become economically affordable, their deployment for bridge monitoring will continue to grow. Data management becomes a critical issue not only for storing the sensor data but also for integrating with the bridge model to support other functions, such as management, maintenance and inspection. The focus of this study is on the effective data management of bridge information and sensor data, which is crucial to structural health monitoring and life cycle management of bridge structures. We review the state-of-the-art of bridge information modeling and sensor data management, and propose a data management framework for bridge monitoring based on NoSQL database technologies that have been shown useful in handling high volume, time-series data and to flexibly deal with unstructured data schema. Specifically, Apache Cassandra and Mongo DB are deployed for the prototype implementation of the framework. This paper describes the database design for an XML-based Bridge Information Modeling (BrIM) schema, and the representation of sensor data using Sensor Model Language (SensorML). The proposed prototype data management framework is validated using data collected from the Yeongjong Bridge in Incheon, Korea.

  12. Railway bridge monitoring during construction and sliding

    Science.gov (United States)

    Inaudi, Daniele; Casanova, Nicoletta; Kronenberg, Pascal; Vurpillot, Samuel

    1997-05-01

    The Moesa railway bridge is a composite steel concrete bridge on three spans of 30 m each. The 50 cm thick concrete deck is supported on the lower flanges of two continuous, 2.7 m high I-beams. The bridge has been constructed alongside an old metallic bridge. After demolishing this one, the new bridge has been slid for 5 m by 4 hydraulic jacks and positioned on the refurbished piles of the old bridge. About 30 fiber optic, low-coherence sensors were imbedded in the concrete deck to monitor its deformations during concrete setting and shrinkage, as well as during the bridge sliding phase. In the days following concrete pour it was possible to follow its thermal expansion due to the exothermic setting reaction and the following thermal and during shrinkage. The deformations induced by the additional load produced by the successive concreting phases were also observed. During the bridge push, which extended over six hours, the embedded and surface mounted sensors allowed the monitoring of the curvature variations in the horizontal plane due to the slightly uneven progression of the jacks. Excessive curvature and the resulting cracking of concrete could be ruled out by these measurements. It was also possible to observe the bridge elongation under the heating action of the sun.

  13. Bridge Deterioration Prediction Model Based On Hybrid Markov-System Dynamic

    Directory of Open Access Journals (Sweden)

    Widodo Soetjipto Jojok

    2017-01-01

    Full Text Available Instantaneous bridge failure tends to increase in Indonesia. To mitigate this condition, Indonesia’s Bridge Management System (I-BMS has been applied to continuously monitor the condition of bridges. However, I-BMS only implements visual inspection for maintenance priority of the bridge structure component instead of bridge structure system. This paper proposes a new bridge failure prediction model based on hybrid Markov-System Dynamic (MSD. System dynamic is used to represent the correlation among bridge structure components while Markov chain is used to calculate temporal probability of the bridge failure. Around 235 data of bridges in Indonesia were collected from Directorate of Bridge the Ministry of Public Works and Housing for calculating transition probability of the model. To validate the model, a medium span concrete bridge was used as a case study. The result shows that the proposed model can accurately predict the bridge condition. Besides predicting the probability of the bridge failure, this model can also be used as an early warning system for bridge monitoring activity.

  14. Comparative life cycle cost assessment of painted and hot-dip galvanized bridges.

    Science.gov (United States)

    Rossi, B; Marquart, S; Rossi, G

    2017-07-15

    The study addresses the life cycle cost assessment (LCCA) of steel bridges, focusing on the maintenance activities and the maintenance scenario. Firstly, the unit costs of maintenance activities and their durability (i.e. the time between two activities) are evaluated. Pragmatic data are provided for the environment category C4 and for three activities: Patch Up, Overcoating and Remove & Replace. A comparative LCCA for a typical hypothetic steel girder bridge is carried out, either painted or hot-dip galvanized (HDG), in the environmental class C4. The LCC versus the cumulated life is provided for both options. The initial cost of the steel unpainted option is only 50.3% of the HDG option. It is shown that after 'Overcoating' occurring at 18.5 years, the total Net Present Value (NPV) of the painted option surpasses that of the HDG option. A sensitivity analysis of the NPV to the cost and service life parameters, the escalation and discount rates is then performed. The discount and escalation rates, considerably influences the total LCC, following a non-linear trend. The total LCC decreases with the discount rate increasing and, conversely, increases with the escalation rate increasing. Secondly, the influence of the maintenance scenario on the total LCC is assessed based on a probabilistic approach. A permutation of the three independent maintenance activities assumed to occur six times over the life of the bridge is considered and a probability of occurrence is associated to each unique scenario. The most probable scenarios are then classified according to their NPV or achieved service life. This approach leads to the definition of a cost-effective maintenance scenario i.e. the scenario, within all the considered permutations, that has the minimum LCC in a range of lifespan. Besides, the probabilistic analysis also shows that, whatever the scenario, the return on investment period ranges between 18.5 years and 24.2 years. After that period, the HDG option becomes

  15. The Assessment of the Ultimate Hull Girder Strength of RO-RO Ship after Damages

    Science.gov (United States)

    Zubair Muis Alie, Muhammad; Sitepu, Ganding; Izaak Latumahin, Samuel

    2018-03-01

    Many accidents of Ro-Ro ships happen in Indonesia such as collision and grounding. When the collision or grounding takes place on the Ro-Ro ship, the ultimate strength of hull structure after damage becomes decrease. Car and passenger decks are critical location since collision and/or grounding occur. In the present study, the assessment of the ultimate hull girder strength is conducted. The cross section of Ro-Ro ship is taken to be analyzed. The collision and grounding damages are assumed to be palced on the side and bottom area, respectively. The damages are created by removing the element from the side shell and bottom part. Finally, the result obtained is compared with one another.

  16. Large scale testing of nitinol shape memory alloy devices for retrofitting of bridges

    International Nuclear Information System (INIS)

    Johnson, Rita; Emmanuel Maragakis, M; Saiid Saiidi, M; Padgett, Jamie E; DesRoches, Reginald

    2008-01-01

    A large scale testing program was conducted to determine the effects of shape memory alloy (SMA) restrainer cables on the seismic performance of in-span hinges of a representative multiple-frame concrete box girder bridge subjected to earthquake excitations. Another objective of the study was to compare the performance of SMA restrainers to that of traditional steel restrainers as restraining devices for reducing hinge displacement and the likelihood of collapse during earthquakes. The results of the tests show that SMA restrainers performed very well as restraining devices. The forces in the SMA and steel restrainers were comparable. However, the SMA restrainer cables had minimal residual strain after repeated loading and exhibited the ability to undergo many cycles with little strength and stiffness degradation. In addition, the hysteretic damping that was observed in the larger ground accelerations demonstrated the ability of the materials to dissipate energy. An analytical study was conducted to assess the anticipated seismic response of the test setup and evaluate the accuracy of the analytical model. The results of the analytical simulation illustrate that the analytical model was able to match the responses from the experimental tests, including peak stresses, strains, forces, and hinge openings

  17. Evaluating fire-damaged components of historic covered bridges

    Science.gov (United States)

    Brian Kukay; Charles Todd; Tyler Jahn; Jenson Sannon; Logan Dunlap; Robert White; Mark Dietenberger

    2016-01-01

    Arson continues to claim many historic covered bridges. Site-specific, post-fire evaluations of the structural integrity of a bridge are often necessary in a fire’s aftermath. Decisions on whether individual wood components can be rehabilitated, reconstructed, or replaced must be made. This report includes coverage of existing approaches and exploratory approaches that...

  18. Large-diameter boring of rock bed by a reveres circulation drill; Ribasu sakyureshon doriru ni yoru daikokei ganban sakko

    Energy Technology Data Exchange (ETDEWEB)

    Sakae, S.; Torii, K. [Kajima Corp., Tokyo (Japan); Hoshino, S.; Motoyama, M.

    1995-09-25

    The Itojima Large Bridge is a road bridge of 675 m in the total length connecting together the Nagashima Island and the Itojima Island in the northwest district of Kagoshima Prefecture, having a central span of 260 m and comprising a 5-span-continuous PC cable stayed bridges and PC box girder bridges. The foundation of this bridge employs a multi-pillar type pile structure. The piling work was started in July, 1991 by a hole inset method in a severe working environment where the depth of water is 20 m, the range of the tides is 4 m, the speed of tidal current is 2 kt, the rock bed structure is complicated and the steep seabed is steeply inclined. This report describes the results of the execution of the reverse circulation drilling, which has a high general versatility in rock bed boring, using self-lifting barges and large working boats during the rock bed boring for the foundation piling for the construction of the Itojima Large Bridge. The report, especially, also introduces the details of the work that casing pipes were driven into a stable rock bed by a vibrojet method for the measure against the collapse of a bore wall which occurred during the boring work. 24 figs., 14 tabs.

  19. 49 CFR 237.73 - Protection of bridges from over-weight and over-dimension loads.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Protection of bridges from over-weight and over... (Continued) FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF TRANSPORTATION BRIDGE SAFETY STANDARDS Capacity of Bridges § 237.73 Protection of bridges from over-weight and over-dimension loads. (a) Each track owner...

  20. Probabilistic seismic hazard assessment for the effect of vertical ground motions on seismic response of highway bridges

    Science.gov (United States)

    Yilmaz, Zeynep

    Typically, the vertical component of the ground motion is not considered explicitly in seismic design of bridges, but in some cases the vertical component can have a significant effect on the structural response. The key question of when the vertical component should be incorporated in design is answered by the probabilistic seismic hazard assessment study incorporating the probabilistic seismic demand models and ground motion models. Nonlinear simulation models with varying configurations of an existing bridge in California were considered in the analytical study. The simulation models were subjected to the set of selected ground motions in two stages: at first, only horizontal components of the motion were applied; while in the second stage the structures were subjected to both horizontal and vertical components applied simultaneously and the ground motions that produced the largest adverse effects on the bridge system were identified. Moment demand in the mid-span and at the support of the longitudinal girder and the axial force demand in the column are found to be significantly affected by the vertical excitations. These response parameters can be modeled using simple ground motion parameters such as horizontal spectral acceleration and vertical spectral acceleration within 5% to 30% error margin depending on the type of the parameter and the period of the structure. For a complete hazard assessment, both of these ground motion parameters explaining the structural behavior should also be modeled. For the horizontal spectral acceleration, Abrahamson and Silva (2008) model was used within many available standard model. A new NGA vertical ground motion model consistent with the horizontal model was constructed. These models are combined in a vector probabilistic seismic hazard analyses. Series of hazard curves developed and presented for different locations in Bay Area for soil site conditions to provide a roadmap for the prediction of these features for future

  1. Optimizing Tailored Bus Bridging Paths

    NARCIS (Netherlands)

    Gu, Wei; Yu, Jie; Ji, Yuxiong; van der Gun, J.P.T.; Pel, A.J.; Zhang, H. Michael; van Arem, B.

    2017-01-01

    Metro disruptions due to unexpected events reduce transit system reliability, resulting in significant productivity loss and long passenger delays. Bus bridging strategy is often used to connect stations affected by metro disruptions such that passengers could continue their journey. The literature

  2. A Longitudinal Study of Work After Retirement: Examining Predictors of Bridge Employment, Continued Career Employment, and Retirement.

    Science.gov (United States)

    Bennett, Misty M; Beehr, Terry A; Lepisto, Lawrence R

    2016-09-01

    Older employees are increasingly accepting bridge employment, which occurs when older workers take employment for pay after they retire from their main career. This study examined predictors of workers' decisions to engage in bridge employment versus full retirement and career employment. A national sample of 482 older people in the United States was surveyed regarding various work-related and nonwork related predictors of retirement decisions, and their retirement status was measured 5 years later. In bivariate analyses, both work-related variables (career goal achievement and experienced pressure to retire) and nonwork-related variables (psychological distress and traditional gender role orientation) predicted taking bridge employment, but in multinomial logistic regression, only nonwork variables had unique effects. Few predictors differentiated the bridge employed and fully retired groups. Nonwork variables were salient in making the decision to retire, and bridge employment may be conceptually more similar to full retirement than to career employment. © The Author(s) 2016.

  3. LIGHT BRIDGE IN A DEVELOPING ACTIVE REGION. II. NUMERICAL SIMULATION OF FLUX EMERGENCE AND LIGHT BRIDGE FORMATION

    International Nuclear Information System (INIS)

    Toriumi, Shin; Katsukawa, Yukio; Cheung, Mark C. M.

    2015-01-01

    Light bridges, the bright structure dividing umbrae in sunspot regions, show various activity events. In Paper I, we reported on an analysis of multi-wavelength observations of a light bridge in a developing active region (AR) and concluded that the activity events are caused by magnetic reconnection driven by magnetconvective evolution. The aim of this second paper is to investigate the detailed magnetic and velocity structures and the formation mechanism of light bridges. For this purpose, we analyze numerical simulation data from a radiative magnetohydrodynamics model of an emerging AR. We find that a weakly magnetized plasma upflow in the near-surface layers of the convection zone is entrained between the emerging magnetic bundles that appear as pores at the solar surface. This convective upflow continuously transports horizontal fields to the surface layer and creates a light bridge structure. Due to the magnetic shear between the horizontal fields of the bridge and the vertical fields of the ambient pores, an elongated cusp-shaped current layer is formed above the bridge, which may be favorable for magnetic reconnection. The striking correspondence between the observational results of Paper I and the numerical results of this paper provides a consistent physical picture of light bridges. The dynamic activity phenomena occur as a natural result of the bridge formation and its convective nature, which has much in common with those of umbral dots and penumbral filaments

  4. Study of a Modified AC Bridge Technique for Loss Angle Measurement of a Dielectric Material

    Directory of Open Access Journals (Sweden)

    S. C. BERA

    2008-09-01

    Full Text Available A Wheatstone’s bridge network like Schering Bridge, DeSauty Bridge etc measures the loss angle or tangent of loss angle (tanδ of a dielectric material. In high voltage application this loss angle is generally measured by high voltage Schering Bridge. But continuous measurement of tan δ is not possible by these techniques. In the present paper a modified operational amplifiers based Schering Bridge network has been proposed for continuous measurement of tanδ in the form of a bridge network output voltage. Mathematical analysis of the proposed bridge network has been discussed in the paper and experimental work has been performed assuming the lossy dielectric material as a series combination of loss less capacitor and a resistor. Experimental results are reported in the paper. From the mathematical analysis and experimental results it is found that the output of the proposed bridge network is almost linearly related with tanδ.

  5. Multi-Hazard Assessment of Scour Damaged Bridges with UAS-Based Measurements

    Science.gov (United States)

    Özcan, O.; Ozcan, O.

    2017-12-01

    Flood and stream induced scour occurring in bridge piers constructed on rivers is one of the mostly observed failure reasons in bridges. Scour induced failure risk in bridges and determination of the alterations in bridge safety under seismic effects has the ultimate importance. Thus, for the determination of bridge safety under the scour effects, the scour amount under bridge piers should be designated realistically and should be tracked and updated continuously. Hereby, the scour induced failures in bridge foundation systems will be prevented and bridge substructure design will be conducted safely. In this study, in order to measure the amount of scour in bridge load bearing system (pile foundations and pile abutments) and to attain very high definition 3 dimensional models of river flood plain for the flood analysis, unmanned aircraft system (UAS) based measurement methods were implemented. UAS based measurement systems provide new and practical approach and bring high precision and reliable solutions considering recent measurement systems. For this purpose, the reinforced concrete (RC) bridge that is located on Antalya Boğaçayı River, Turkey and that failed in 2003 due to flood-induced scour was selected as the case study. The amount of scour occurred in bridge piers and piles was determined realistically and the behavior of bridge piers under scour effects was investigated. Future flood effects and the resultant amount of scour was determined with HEC-RAS software by using digital surface models that were obtained at regular intervals using UAS for the riverbed. In the light of the attained scour measurements and expected scour after a probable flood event, the behavior of scour damaged RC bridge was investigated by pushover and time history analyses under lateral and vertical seismic loadings. In the analyses, the load and displacement capacity of bridge was observed to diminish significantly under expected scour. Thus, the deterioration in multi hazard

  6. The effects of the pedestal/floor interface on the dynamic characteristics of the storage ring girder support assemblies

    International Nuclear Information System (INIS)

    Jendrzejczyk, J.A.; Chen, S.S.; Zhu, S.; Mangra, D.; Smith, R.K.

    1993-05-01

    To avoid unacceptable vibration of the storage ring quadrupoles, and to ensure that the established vibration criteria are satisfied, the philosophy from inception of the APS has been (1) to locate and design the machine to minimize motion of the storage ring basemat and, (2) following construction, to monitor machine operation and user experiments to ensure that vibration sources are not introduced. This report addresses the design of the storage ring girder support assemblies, and, specifically, the effect of the pedestal/floor interface on the dynamic characteristics (i.e., resonant frequencies, damping, and mode shape)

  7. Concrete-Filled Steel Tube Arch Bridges in China

    Directory of Open Access Journals (Sweden)

    Jielian Zheng

    2018-02-01

    Full Text Available In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare in the history of bridge development. The large-scale construction of expressways and high-speed railways demands the development of long-span arch bridges, and advances in design and construction techniques have made it possible to construct such bridges. In the present study, the current status, development, and major innovative technologies of CFST arch bridges and concrete arch bridges with a CFST skeleton in China are elaborated. This paper covers the key construction technologies of CFST arch bridges, such as the design, manufacture, and installation of steel tube arch trusses, the preparation and pouring of in-tube concrete, and the construction of the world’s longest CFST arch bridge—the First Hejiang Yangtze River Bridge. The main construction technologies of reinforced concrete arch bridges are also presented, which include cable-stayed fastening-hanging cantilever assembly, adjusting the load by means of stay cables, surrounding the concrete for arch rib pouring, and so forth. In addition, the construction of two CFST skeleton concrete arch bridges—the Guangxi Yongning Yong River Bridge and the Yunnan–Guangxi Railway Nanpan River Bridge—is discussed. CFST arch bridges in China have already gained a world-leading position; with the continuous innovation of key technologies, China will become the new leader in promoting the development of arch bridges. Keywords: Concrete-filled steel tube (CFST arch bridge, Steel-reinforced concrete arch bridge, Cable-stayed fastening-hanging cantilever assembly, Vacuum-assisted pouring in-tube concrete, Adjusting load by stay cables

  8. Study on bridge checking evaluation based on deformation-Stress data

    Science.gov (United States)

    Shi, Jing Xian; Cheng, Ying Jie

    2018-06-01

    Bridge structure plays a very important role in human traffic. The evaluation of bridge structure after a certain period of operation has always been the focus of the bridge. Based on the data collected from the health inspection system of a continuous rigid frame bridge on a highway in Yunnan, China, it is found that there is a certain linear relationship between the deformation and stress of the bridge structure. In view of a specific section of the structure, the stress value of this section can be derived according to its deformation value. The coefficient K can be calculated by comparing the estimated value to the actual measured value. According to the range of the K value, the structural state of the bridge can be evaluated to a certain extent.

  9. Author Details

    African Journals Online (AJOL)

    Experimental Study on Flexural Response of FRP Strengthened Masonry Beams Abstract PDF · Vol 34, No 4 (2015) - Building, Civil & Geotechical Engineering Numerical and Experimental Modeling of the Static Response of Simply Supported Thin-Walled Box Girder Bridges Abstract PDF. ISSN: 2467-8821. AJOL African ...

  10. 78 FR 39436 - Temporary Closure of I-65 (I-70/I-65 South Split Interchange to I-70/I-65 North Split Interchange...

    Science.gov (United States)

    2013-07-01

    ..., which consists of replacing the northbound and southbound bridge girders and lowering the pavement..., Dockets Management Facility, Room W12-140, 1200 New Jersey Avenue SE., Washington, DC 20590, or fax... Jones, Office of Freight Management and Operations, Office of Operations, (202) 366-2976, Mr. Bill Winne...

  11. 47 CFR 80.331 - Bridge-to-bridge communication procedure.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Bridge-to-bridge communication procedure. 80..., Alarm, Urgency and Safety Procedures § 80.331 Bridge-to-bridge communication procedure. (a) Vessels subject to the Bridge-to-Bridge Act transmitting on the designated navigational frequency must conduct...

  12. Monitoring Bridge Dynamic Deformation in Vibration by Digital Photography

    Science.gov (United States)

    Yu, Chengxin; Zhang, Guojian; Liu, Xiaodong; Fan, Li; Hai, Hua

    2018-01-01

    This study adopts digital photography to monitor bridge dynamic deformation in vibration. Digital photography in this study is based on PST-TBPM (photographing scale transformation-time baseline parallax method). Firstly, we monitor the bridge in static as a zero image. Then, we continuously monitor the bridge in vibration as the successive images. Based on the reference points on each image, PST-TBPM is used to calculate the images to obtain the dynamic deformation values of these deformation points. Results show that the average measurement accuracies are 0.685 pixels (0.51mm) and 0.635 pixels (0.47mm) in X and Z direction, respectively. The maximal deformations in X and Z direction of the bridge are 4.53 pixels and 5.21 pixels, respectively. PST-TBPM is valid in solving the problem that the photographing direction is not perpendicular to the bridge. Digital photography in this study can be used to assess bridge health through monitoring the dynamic deformation of a bridge in vibration. The deformation trend curves also can warn the possible dangers over time.

  13. Risk Stratification of Patients With Current Generation Continuous-Flow Left Ventricular Assist Devices Being Bridged to Heart Transplantation.

    Science.gov (United States)

    Guha, Ashrith; Nguyen, Duc; Cruz-Solbes, Ana S; Amione-Guerra, Javier; Schutt, Robert C; Bhimaraj, Arvind; Trachtenberg, Barry H; Park, Myung H; Graviss, Edward A; Gaber, Osama; Suarez, Erik; Montane, Eva; Torre-Amione, Guillermo; Estep, Jerry D

    Patients bridged to transplant (BTT) with continuous-flow left ventricular assist devices (CF-LVADs) have increased in the past decade. Decision support tools for these patients are limited. We developed a risk score to estimate prognosis and guide decision-making. We included heart transplant recipients bridged with CF-LVADs from the United Network for Organ Sharing (UNOS) database and divided them into development (2,522 patients) and validation cohorts (1,681 patients). Univariate and multivariate Cox proportional hazards models were performed. Variables that independently predicted outcomes (age, African American race, recipient body mass index [BMI], intravenous [IV] antibiotic use, pretransplant dialysis, and total bilirubin) were assigned weight using linear transformation, and risk scores were derived. Patients were grouped by predicted posttransplant mortality: low risk (≤ 38 points), medium risk (38-41 points), and high risk (≥ 42 points). We performed Cox proportional hazards analysis on wait-listed CF-LVAD patients who were not transplanted. Score significantly discriminated survival among the groups in the development cohort (6.7, 12.9, 20.7; p = 0.001), validation cohort (6.4, 10.1, 13.6; p assist device (LVAD) BTT risk score that effectively identifies CF-LVAD patients who are at higher risk for worse outcomes after heart transplant. This score may help physicians weigh the risks of transplantation in patients with CF-LVAD.

  14. Plans for crash-tested wood bridge railings for concrete decks

    Science.gov (United States)

    Michael A. Ritter; Ronald K. Faller; Barry T. Rosson; Paula D. Hilbrich Lee; Sheila Rimal. Duwadi

    1998-01-01

    As part of a continuing cooperative research between the Midwest Roadside Safety Facility (MwRSF); the USDA Forest Service, Forest Products Laboratory (FPL); and the Federal Highway Administration (FHWA), several crashworthy wood bridge railings and approach railing transitions have been adapted for use on concrete bridge decks. These railings meet testing and...

  15. Study on Construction Technology of Municipal Road and Bridge Concrete

    Science.gov (United States)

    Tang, Fuyong

    2018-03-01

    With the continuous development of social economy and the accelerating process of urbanization, municipal road and bridge projects have also shown a trend of rapid development. Municipal road and bridge work can fully reflect the economic and cultural development level of cities and is also an important symbol of urban development. As a basic material of construction, concrete is widely used in engineering construction. This article will analyze the municipal road and bridge concrete construction technology, put forward corresponding measures.

  16. 76 FR 66775 - Emergency Temporary Closure of the I-64 Sherman-Minton Bridge Over the Ohio River Between Indiana...

    Science.gov (United States)

    2011-10-27

    ... Temporary Closure of the I-64 Sherman-Minton Bridge Over the Ohio River Between Indiana and Kentucky... Transportation to continue temporary closure of the I-64 Sherman-Minton Bridge over the Ohio River between... Administration (FHWA) announces the continued closure of the I-64 Sherman-Minton Bridge over the Ohio River...

  17. Research Article Special Issue

    African Journals Online (AJOL)

    2016-05-15

    May 15, 2016 ... bridge deck and girders, but the first highway applications were in France ... Other advantages are such as the ability to span voids that develop ... Recent progresses in software programing made it simple to utilize ... Recognizing the importance of knowledge gained by existing rigid pavement design, the.

  18. Structural health monitoring of bridge cables : An overview

    OpenAIRE

    DRISSI HABTI, Monssef; BETTI, Raimondo; YANEV, Bojidar

    2009-01-01

    Bridges are critical components of the civil infrastructure and are normally designed for a long life span. The life span of suspension bridges depends on the health of their cables, which, in turn, is a function of many factors. Therefore, continuous health monitoring (SHM) and regular condition assessment of cables is highly desirable. In this article, some SHM procedures based on direct, indirect non-destructive techniques NDT, and vibration theory are presented.

  19. IceBridge: Bringing a Field Campaign Home

    Science.gov (United States)

    Woods, J.; Beck, J.; Bartholow, S.

    2015-12-01

    IceBridge, a six-year NASA mission, is the largest airborne survey of Earth's polar ice ever flown. It will yield an unprecedented three-dimensional view of Arctic and Antarctic ice sheets, ice shelves and sea ice. These flights will provide a yearly, multi-instrument look at the behavior of the rapidly changing features of the Greenland and Antarctic ice. Data collected during IceBridge will help scientists bridge the gap in polar observations between NASA's Ice, Cloud and Land Elevation Satellite (ICESat) -- in orbit since 2003 -- and ICESat-2, planned for 2017. ICESat stopped collecting science data in 2009, making IceBridge critical for ensuring a continuous series of observations. IceBridge will use airborne instruments to map Arctic and Antarctic areas once a year at a minimum, with new campaigns being developed during the Arctic melt season. IceBridge flights are conducted in the spring and summer for the Arctic and in the fall over Antarctica. Other smaller airborne surveys around the world are also part of the IceBridge campaign. IceBridge actively engages the public and educators through a variety of outlets ranging from communications strategies through social media outlets, to larger organized efforts such as PolarTREC. In field activities include blog posts, photo updates, in flight chat sessions, and more intensive live events to include google hangouts, where field team members can interact with the public during a scheduled broadcast. The IceBridge team provides scientists and other team members with the training and support to become communicators in their own right. There is an exciting new initiative where IceBridge will be collaborating with Undergraduate and Graduate students to integrate the next generation of scientists and communicators into the Science Teams. This will be explored through partnerships with institutions that are interested in mentoring through project based initiatives.

  20. Effect of Concrete Creep on the displacement of single tower single cable plane Extradosed Cable-stayed Bridge

    Science.gov (United States)

    Shi, Jing-xian; Ran, Zhi-hong

    2018-03-01

    Extradossed Cable-stayed Bridge is both cable-stayed Bridge and Continuous rigid frame bridge mechanics feature, Beam is the main force components, cable is supplement.This article combined with a single tower and single cable plane Extradossed cable-stayed bridge in Yunnan, use different creep calculation models and analysis deflection caused by creep effects. The results showing that deflection caused by creep effect is smaller than the same span continuous rigid frame bridge, the value is about 2cm. On the other hand the deflection is increasing with ambient humidity decreases, therefore in the dry environment the calculation model is relatively large in the pre-camber. In the choice of RC creep model is significant in the dry areas.

  1. Myocardial Bridge

    Science.gov (United States)

    ... Center > Myocardial Bridge Menu Topics Topics FAQs Myocardial Bridge En español Your heart is made of muscle, ... surface of the heart. What is a myocardial bridge? A myocardial bridge is a band of heart ...

  2. Dynamic analysis of 19-span continuous space frame bridge with lead rubber bearings based on vibration tests; 19 keikan renzoku rittai menshinkyo no shindo jikken ni motozuku doteki kaiseki

    Energy Technology Data Exchange (ETDEWEB)

    Kajikawa, Y.; Fukada, S. [Kanazawa Univ. (Japan); Sugimoto, M.; Hama, H

    1998-10-21

    The Hanshin/Awaji earthquake disaster caused extensive damage to many bridges of the Hanshin Expressway. N particular, falling-down of superstructures and other destructive damage occurred at Benten Kouku which located in downtown of Kobe. After the earthquake disaster, the continuous 19-span space frame bridge with lead rubber bearings which had approximate 565m bridge length was reconstructed in this region. It is the first trial in Japan to use large lead rubber bearings as an isolator or as a damper at the bottom of the steel pier for the purpose of reduction of seismic force acting on this bridge. As the lead rubber bearings, a spring member was used. In this study, by using jack with a raid releasing mechanism, monotonous loading tests loading statically at the bottom of the pier and rapid releasing tests deloading loads in a moment were carried out. Further, the simulation of the experiment was conducted on the analysis and the analytical model was established in comparison of the experimental data and the analytical data. Using this model, owing to carry out the seismic response analysis, more reliable analytical results were obtained. 22 refs., 24 figs., 3 tabs.

  3. Parameter Estimation in Continuous Time Domain

    Directory of Open Access Journals (Sweden)

    Gabriela M. ATANASIU

    2016-12-01

    Full Text Available This paper will aim to presents the applications of a continuous-time parameter estimation method for estimating structural parameters of a real bridge structure. For the purpose of illustrating this method two case studies of a bridge pile located in a highly seismic risk area are considered, for which the structural parameters for the mass, damping and stiffness are estimated. The estimation process is followed by the validation of the analytical results and comparison with them to the measurement data. Further benefits and applications for the continuous-time parameter estimation method in civil engineering are presented in the final part of this paper.

  4. Demonstration of Corrosion-Resistant Hybrid Composite Bridge Beams for Structural Applications

    Science.gov (United States)

    2016-09-01

    published by ERDC, visit the ERDC online library at http://acwc.sdp.sirsi.net/client/default. DoD Corrosion Prevention and Control Program ERDC/CERL...loading condition was con- trolled by positive flexure of the center girder at midspan. The HL-93 load rating was controlled by the two lanes loaded

  5. Performance of a Press-Lam bridge : a 5-year load-testing and monitoring program

    Science.gov (United States)

    D. S. Gromala; R. C. Moody; M. M. Sprinkel

    1985-01-01

    This paper summarizes the results of load tests on an experimental highway bridge erected and put into service on the George Washington National Forest in Virginia in 1977. The bridge, made entirely of Press-Lam, a laminated veneer lumber (LVL) product, was load tested 1 month, 1 year, and 5 years after erection. The bridge continues to perform quite well and,...

  6. The Akashi Kaikyo Bridge and the Storebælt Bridge

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    1999-01-01

    With the completion of the Akashi Kaikyo Bridge and the Storebælt East Bridge the development of the suspension bridge technology in the 20th century has manifested itself in two impressive structures. With the present echnology may bridges of similar (and also more modest) dimensions...... will undoubtedly be built far into the next century. For bridges going beyond the spans of existing bridges it is, however, likely that new concepts will be developed....

  7. Aerodynamic stability of long span suspension bridges with low torsional natural frequencies

    DEFF Research Database (Denmark)

    Andersen, Michael Styrk; Johansson, Jens; Brandt, Anders

    2016-01-01

    tests where the torsional frequency was lower than the vertical. But too low torsional stiffness caused large static displacements of the girder at medium–high wind speeds and steady state oscillations driven by a combination of torsional divergence and stalling behavior at the critical wind seed...

  8. 46 CFR 131.915 - Persons allowed in pilothouse and on navigational bridge.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Persons allowed in pilothouse and on navigational bridge. 131.915 Section 131.915 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE... bridge. No person may be in the pilothouse while the vessel is under way, unless connected with the...

  9. Comportamiento estructural y criterios de diseño de los puentes extradosados: visión general y estado del arte Structural behavior and design criteria of extradosed bridges: general insight and state of the art

    Directory of Open Access Journals (Sweden)

    José Benjumea

    2010-01-01

    Full Text Available Durante los últimos 10 años, los puentes extradosados se han convertido en una solución estructural atractiva alrededor del mundo, gracias a los buenos resultados obtenidos con las primeras realizaciones en Japón. Esta nueva tipología, reconocida generalmente como una solución intermedia entre los puentes atirantados y los de pretensado de viga cajón construidos por voladizos sucesivos, se ha convertido en una opción interesante. Por consiguiente, dado el interés que hoy en día existe alrededor de este tipo de puente, en este trabajo se presenta el contexto histórico que describe su origen, y se exponen la influencia de los principales elementos estructurales en el comportamiento del puente, y los criterios de diseño que han sido propuestos por investigadores en el tema. De esta manera, se espera ofrecer una visión general de la concepción y el comportamiento estructural de los puentes extradosados para que sea considerada una alternativa más de tipología estructural de puentes en nuestro medio.Over the past 10 years, Extradosed bridges have become an attractive structural type around the world, due to the good results obtained with the first bridges constructed in Japan. This new typology, generally recognized as an intermediate solution between cable stayed bridges and cantilever constructed prestressed box-girder bridges, because these take advantages of design and constructions methods of the other two typologies, has become an interesting option. Therefore, given the interest that exist about this type of bridge, in this paper the historical context that describes its origin, the influence of the principal structural elements and the design criteria proposed by researchers are presented. In this way it is expected to offer a general insight into the design conception and structural behavior of Extradosed Bridges, so that they may be considered as an alternative structure for bridges in the Americas.

  10. Bridge Management Systems

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle

    In this paper bridge management systems are discussed with special emphasis on management systems for reinforced concrete bridges. Management systems for prestressed concrete bridges, steel bridges, or composite bridges can be developed in a similar way....

  11. A Brillouin smart FRP material and a strain data post processing software for structural health monitoring through laboratory testing and field application on a highway bridge

    Science.gov (United States)

    Bastianini, Filippo; Matta, Fabio; Galati, Nestore; Nanni, Antonio

    2005-05-01

    Strain and temperature sensing obtained through frequency shift evaluation of Brillouin scattered light is a technology that seems extremely promising for Structural Health Monitoring (SHM). Due to the intrinsic distributed sensing capability, Brillouin can measure the deformation of any individual segment of huge lengths of inexpensive single-mode fiber. In addition, Brillouin retains other typical advantages of Fiber Optic Sensors (FOS), such as harsh environment durability and interference rejection. Despite these advantages, the diffusion of Brillouin for SHM is constrained by different factors, such as the high equipment cost, the commercial unavailability of specific SHM oriented fiber products and even some prejudices on the required sensitivity performances. In the present work, a complete SHM pilot application was developed, installed and successfully operated during a diagnostic load test on the High Performance Steel (HPS) bridge A6358 located at the Lake of the Ozarks (Miller County, MO, USA). Four out of five girders were extensively instrumented with a "smart" Glass Fiber Reinforced Polymer (GFRP) tape having embedded fibers for strain sensing and thermal compensation. Data collected during a diagnostic load test were elaborated through a specific post-processing software, and the strain profiles retrieved were compared to traditional strain gauges and theoretical results based on the AASHTO LRFD Bridge Design Specifications for structural assessment purposes. The excellent results obtained confirm the effectiveness of Brillouin SHM systems for the monitoring of real applications.

  12. Creep and shrinkage effects on integral abutment bridges

    Science.gov (United States)

    Munuswamy, Sivakumar

    Integral abutment bridges provide bridge engineers an economical design alternative to traditional bridges with expansion joints owing to the benefits, arising from elimination of expensive joints installation and reduced maintenance cost. The superstructure for integral abutment bridges is cast integrally with abutments. Time-dependent effects of creep, shrinkage of concrete, relaxation of prestressing steel, temperature gradient, restraints provided by abutment foundation and backfill and statical indeterminacy of the structure introduce time-dependent variations in the redundant forces. An analytical model and numerical procedure to predict instantaneous linear behavior and non-linear time dependent long-term behavior of continuous composite superstructure are developed in which the redundant forces in the integral abutment bridges are derived considering the time-dependent effects. The redistributions of moments due to time-dependent effects have been considered in the analysis. The analysis includes nonlinearity due to cracking of the concrete, as well as the time-dependent deformations. American Concrete Institute (ACI) and American Association of State Highway and Transportation Officials (AASHTO) models for creep and shrinkage are considered in modeling the time dependent material behavior. The variations in the material property of the cross-section corresponding to the constituent materials are incorporated and age-adjusted effective modulus method with relaxation procedure is followed to include the creep behavior of concrete. The partial restraint provided by the abutment-pile-soil system is modeled using discrete spring stiffness as translational and rotational degrees of freedom. Numerical simulation of the behavior is carried out on continuous composite integral abutment bridges and the deformations and stresses due to time-dependent effects due to typical sustained loads are computed. The results from the analytical model are compared with the

  13. Railroad Bridges

    Data.gov (United States)

    Department of Homeland Security — Bridges-Rail in the United States According to The National Bridge Inspection Standards published in the Code of Federal Regulations (23 CFR 650.3), a bridge isA...

  14. Implementation of Bridge Management System on Interurban Bridge in Maluku Province

    Directory of Open Access Journals (Sweden)

    Erwin Marasabessy

    2015-05-01

    Full Text Available Bridges as transport infrastructures play a vital role in smoothing traffic flows. The success of a bridge in playing its role and serving its function depends on its management. The Directorate General of Highways of the Ministry of Public Work has used a system to manage bridges known as the Bridge Management System (BMS. The system allows a systematic plan and provides a uniform procedure for all bridge operation activities on the national and provincial level. Data from Implementation Agency of National Inter-Urban Roads of Area IX, Northern Maluku in 2011 indicates that the total length of national roads in Maluku Province is 15,238.01 M, with a total of 562 bridges. In Ambon Island, especially, there are 52 bridges totaling 1,176.25 m in length. The study was conducted at several inter-urban bridges in Maluku Province of Ambon Island: Wai Batu Merah, Wai Ruhu, Wai Lawa, Wai Yari and Wai Tua bridges. Assessment of bridge structure conditions was conducted visually to determine the conditions of the existing bridges comprehensively by referring to the Bridge Management System (BMS complemented with a computer-based Bridge Management Information System (BMIS. Condition scores for the five bridges—Wai Batu Merah, Wai Ruhu, Wai Lawa, Wai Yari, and Wai Tua, according to Bridge Management System, are 2, 1, 2, 1, and 2 respectively. The scores of the five bridges indicate that their physical condition can be categorized as good or with minor defects. Based on technical screening, the proposed treatment for Wai Batu Merah, Wai Ruhu, Wai Lawa, dan Wai Tua bridges is the rehabilitation of their sub-elements. As for the Wai Yari Bridge, the treatment will be maintained regularly. The defect repair costs are IDR 149,138,238.00, IDR 81,048,000.00, IDR 174,579,106.10, IDR 79,233,324.01 and IDR 238,323,258.60 for Wai Batu, Wai Ruhu, Wai Lawa, Wai Yari, and Wai Tua Bridges, respectively.

  15. New technique of railway bridges in Hokuriku Shinkansen; Hokuriku Shinkansen tetsudokyo no gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    Miyabayashi, H. [Japan Railway Construction Public Corp., Tokyo (Japan)

    1996-09-01

    This paper presents new technologies of the railway bridges in Hokuriku Shinkansen. Hokuriku Shinkansen of 117km between Takasaki and Nagano is a part of Shinkansen connecting Tokyo with Nagano by nearly 1.5 hours. Its construction is in promotion under severe financial condition, and cost reduction is an essential target. Among the concrete bridges in this section, Kirizumigawa bridge, a prestressed concrete strutted 3-span continuous beam bridge, adopted a lowering erection method for its slant pier. In this method featured by high safety and profitability, the rib component of a concrete arch bridge is vertically erected on a arch support, and installed by swinging it toward the central span. In addition, a cantilever method was adopted to keep the scenery of a national park. Daini Chikumagawa bridge with the longest span of 133.9m among concrete railway bridges is the first cable-stayed prestressed concrete bridge in Shinkansen. Yashiro Minami and Kita bridges of 105m and 90m in central span are the extradosed bridges which were adopted as optimum structure for lowering the beam height of meddle-sized railway bridges. 3 refs., 12 figs., 2 tabs.

  16. Steel framing strategies for highly skewed bridges to reduce/eliminate distortion near skewed supports : [summary].

    Science.gov (United States)

    2014-05-01

    In the past, bridges were aligned normal to crossing roads or obstacles in order to simplify bridge construction. However, the continuing expansion of the interstate system has challenged engineers to provide more horizontal clearance, reduce right-o...

  17. High-speed railway bridge dynamic measurement based on GB-InSAR technology

    Science.gov (United States)

    Liu, Miao; Ding, Ke-liang; Liu, Xianglei; Song, Zichao

    2015-12-01

    It is an important task to evaluate the safety during the life of bridges using the corresponding vibration parameters. With the advantages of non-contact and high accuracy, the new remote measurement technology of GB-InSAR is suitable to make dynamic measurement for bridges to acquire the vibration parameters. Three key technologies, including stepped frequency-continuous wave technique, synthetic aperture radar and interferometric measurement technique, are introduced in this paper. The GB-InSAR is applied for a high-speed railway bridge to measure of dynamic characteristics with the train passing which can be used to analyze the safety of the monitored bridge. The test results shown that it is an reliable non-contact technique for GB-InSAR to acquire the dynamic vibration parameter for the high-speed railway bridges.

  18. Long-term bridge performance high priority bridge performance issues.

    Science.gov (United States)

    2014-10-01

    Bridge performance is a multifaceted issue involving performance of materials and protective systems, : performance of individual components of the bridge, and performance of the structural system as a whole. The : Long-Term Bridge Performance (LTBP)...

  19. OGLE-ing the Magellanic system: stellar populations in the Magellanic Bridge

    International Nuclear Information System (INIS)

    Skowron, D. M.; Jacyszyn, A. M.; Udalski, A.; Szymański, M. K.; Skowron, J.; Poleski, R.; Kozłowski, S.; Kubiak, M.; Pietrzyński, G.; Soszyński, I.; Mróz, P.; Pietrukowicz, P.; Ulaczyk, K.; Wyrzykowski, Ł.

    2014-01-01

    We report the discovery of a young stellar bridge that forms a continuous connection between the Magellanic Clouds. This finding is based on number density maps for stellar populations found in data gathered by OGLE-IV that fully cover over 270 deg 2 of the sky in the Magellanic Bridge area. This is the most extensive optical survey of this region to date. We find that the young population is present mainly in the western half of the MBR, which, together with the newly discovered young population in the eastern Bridge, form a continuous stream of stars connecting both galaxies along δ ∼ –73.5 deg. The young population distribution is clumped, with one of the major densities close to the SMC and the other fairly isolated and located approximately mid-way between the Clouds, which we call the OGLE island. These overdensities are well matched by H I surface density contours, although the newly found young population in the eastern Bridge is offset by ∼2 deg north from the highest H I density contour. We observe a continuity of red clump stars between the Magellanic Clouds which represent an intermediate-age population. Red clump stars are present mainly in the southern and central parts of the Magellanic Bridge, below its gaseous part, and their presence is reflected by a strong deviation from the radial density profiles of the two galaxies. This may indicate either a tidal stream of stars, or that the stellar halos of the two galaxies overlap. On the other hand, we do not observe such an overlap within an intermediate-age population represented by the top of the red giant branch and the asymptotic giant branch stars. We also see only minor mixing of the old populations of the Clouds in the southern part of the Bridge, represented by the lowest part of the red giant branch.

  20. OGLE-ing the Magellanic system: stellar populations in the Magellanic Bridge

    Energy Technology Data Exchange (ETDEWEB)

    Skowron, D. M.; Jacyszyn, A. M.; Udalski, A.; Szymański, M. K.; Skowron, J.; Poleski, R.; Kozłowski, S.; Kubiak, M.; Pietrzyński, G.; Soszyński, I.; Mróz, P.; Pietrukowicz, P.; Ulaczyk, K.; Wyrzykowski, Ł., E-mail: dszczyg@astrouw.edu.pl [Warsaw University Astronomical Observatory, Aleje Ujazdowskie 4, 00-478 Warszawa (Poland)

    2014-11-10

    We report the discovery of a young stellar bridge that forms a continuous connection between the Magellanic Clouds. This finding is based on number density maps for stellar populations found in data gathered by OGLE-IV that fully cover over 270 deg{sup 2} of the sky in the Magellanic Bridge area. This is the most extensive optical survey of this region to date. We find that the young population is present mainly in the western half of the MBR, which, together with the newly discovered young population in the eastern Bridge, form a continuous stream of stars connecting both galaxies along δ ∼ –73.5 deg. The young population distribution is clumped, with one of the major densities close to the SMC and the other fairly isolated and located approximately mid-way between the Clouds, which we call the OGLE island. These overdensities are well matched by H I surface density contours, although the newly found young population in the eastern Bridge is offset by ∼2 deg north from the highest H I density contour. We observe a continuity of red clump stars between the Magellanic Clouds which represent an intermediate-age population. Red clump stars are present mainly in the southern and central parts of the Magellanic Bridge, below its gaseous part, and their presence is reflected by a strong deviation from the radial density profiles of the two galaxies. This may indicate either a tidal stream of stars, or that the stellar halos of the two galaxies overlap. On the other hand, we do not observe such an overlap within an intermediate-age population represented by the top of the red giant branch and the asymptotic giant branch stars. We also see only minor mixing of the old populations of the Clouds in the southern part of the Bridge, represented by the lowest part of the red giant branch.

  1. 47 CFR 80.163 - Operator requirements of the Bridge-to-Bridge Act.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Operator requirements of the Bridge-to-Bridge... Requirements § 80.163 Operator requirements of the Bridge-to-Bridge Act. Each ship subject to the Bridge-to-Bridge Act must have on board a radio operator who holds a restricted radiotelephone operator permit or...

  2. Bridge health monitoring metrics : updating the bridge deficiency algorithm.

    Science.gov (United States)

    2009-10-01

    As part of its bridge management system, the Alabama Department of Transportation (ALDOT) must decide how best to spend its bridge replacement funds. In making these decisions, ALDOT managers currently use a deficiency algorithm to rank bridges that ...

  3. Bridge SHM system based on fiber optical sensing technology

    Science.gov (United States)

    Li, Sheng; Fan, Dian; Fu, Jiang-hua; Huang, Xing; Jiang, De-sheng

    2015-09-01

    The latest progress of our lab in recent 10 years on the area of bridge structural health monitoring (SHM) based on optical fiber sensing technology is introduced. Firstly, in the part of sensing technology, optical fiber force test-ring, optical fiber vibration sensor, optical fiber smart cable, optical fiber prestressing loss monitoring method and optical fiber continuous curve mode inspection system are developed, which not only rich the sensor types, but also provides new monitoring means that are needed for the bridge health monitoring system. Secondly, in the optical fiber sensing network and computer system platform, the monitoring system architecture model is designed to effectively meet the integration scale and effect requirement of engineering application, especially the bridge expert system proposed integration of sensing information and informatization manual inspection to realize the mode of multi index intelligence and practical monitoring, diagnosis and evaluation. Finally, the Jingyue bridge monitoring system as the representative, the research on the technology of engineering applications are given.

  4. 47 CFR 80.309 - Watch required by the Bridge-to-Bridge Act.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Watch required by the Bridge-to-Bridge Act. 80... Safety Watches § 80.309 Watch required by the Bridge-to-Bridge Act. In addition to the watch requirement contained in § 80.148, all vessels subject to the Bridge-to-Bridge Act must keep a watch on the designated...

  5. The use of lifetime functions in the optimization of interventions on existing bridges considering maintenance and failure costs

    Energy Technology Data Exchange (ETDEWEB)

    Yang, Seung-Ie [Department of Civil, Enviromental, and Architectural Enginnering, University of Colorado, Campus Box 428, Boulder, CO 80309-0428 (United States)]. E-mail: yangsione@dreamwiz.com; Frangopol, Dan M. [Department of Civil, Enviromental, and Architectural Enginnering, University of Colorado, Campus Box 428, Boulder, CO 80309-0428 (United States)]. E-mail: dan.frangopol@colorado.edu; Kawakami, Yoriko [Hanshin Expressway Public Corporation, Kobe Maintenance Department, 16-1 Shinko-cho Chuo-ku Kobe City, Hyogo, 650-0041 (Japan)]. E-mail: yoriko-kawakami@hepc.go.jp; Neves, Luis C. [Department of Civil, Enviromental, and Architectural Enginnering, University of Colorado, Campus Box 428, Boulder, CO 80309-0428 (United States)]. E-mail: lneves@civil.uminho.pt

    2006-06-15

    In the last decade, it became clear that life-cycle cost analysis of existing civil infrastructure must be used to optimally manage the growing number of aging and deteriorating structures. The uncertainties associated with deteriorating structures require the use of probabilistic methods to properly evaluate their lifetime performance. In this paper, the deterioration and the effect of maintenance actions are analyzed considering the performance of existing structures characterized by lifetime functions. These functions allow, in a simple manner, the consideration of the effect of aging on the decrease of the probability of survival of a structure, as well as the effect of maintenance actions. Models for the effects of proactive and reactive preventive maintenance, and essential maintenance actions are presented. Since the probability of failure is different from zero during the entire service life of a deteriorating structure and depends strongly on the maintenance strategy, the cost of failure is included in this analysis. The failure of one component in a structure does not usually lead to failure of the structure and, as a result, the safety of existing structures must be analyzed using a system reliability framework. The optimization consists of minimizing the sum of the cumulative maintenance and expected failure cost during the prescribed time horizon. Two examples of application of the proposed methodology are presented. In the first example, the sum of the maintenance and failure costs of a bridge in Colorado is minimized considering essential maintenance only and a fixed minimum acceptable probability of failure. In the second example, the expected lifetime cost, including maintenance and expected failure costs, of a multi-girder bridge is minimized considering reactive preventive maintenance actions.

  6. The use of lifetime functions in the optimization of interventions on existing bridges considering maintenance and failure costs

    International Nuclear Information System (INIS)

    Yang, Seung-Ie; Frangopol, Dan M.; Kawakami, Yoriko; Neves, Luis C.

    2006-01-01

    In the last decade, it became clear that life-cycle cost analysis of existing civil infrastructure must be used to optimally manage the growing number of aging and deteriorating structures. The uncertainties associated with deteriorating structures require the use of probabilistic methods to properly evaluate their lifetime performance. In this paper, the deterioration and the effect of maintenance actions are analyzed considering the performance of existing structures characterized by lifetime functions. These functions allow, in a simple manner, the consideration of the effect of aging on the decrease of the probability of survival of a structure, as well as the effect of maintenance actions. Models for the effects of proactive and reactive preventive maintenance, and essential maintenance actions are presented. Since the probability of failure is different from zero during the entire service life of a deteriorating structure and depends strongly on the maintenance strategy, the cost of failure is included in this analysis. The failure of one component in a structure does not usually lead to failure of the structure and, as a result, the safety of existing structures must be analyzed using a system reliability framework. The optimization consists of minimizing the sum of the cumulative maintenance and expected failure cost during the prescribed time horizon. Two examples of application of the proposed methodology are presented. In the first example, the sum of the maintenance and failure costs of a bridge in Colorado is minimized considering essential maintenance only and a fixed minimum acceptable probability of failure. In the second example, the expected lifetime cost, including maintenance and expected failure costs, of a multi-girder bridge is minimized considering reactive preventive maintenance actions

  7. Quasi-Static Condensation of Aeroelastic Suspension Bridge Model

    DEFF Research Database (Denmark)

    Møller, Randi N.; Krenk, Steen; N. Svendsen, Martin

    2017-01-01

    For long span bridges the wind-induced dynamic response is a design driving factor and therefore continuously a subject for detailed analysis. Traditionally both buffeting and stability calculations have been considered in the frequency domain. However, this yields alimitation in accounting...... for turbulence when considering the stability limit and further it is not possible to account for non-linear effects. These limitations suggest to do simulations of the aeroelastic response of long span bridges in the time domain. For this it is of interest to have an efficient model while still maintaining...... sufficient accuracy. This contribution is on quasi-static reduction of an aeroelastic finite element model of a 3000m suspension bridge proposed for crossing Sulafjorden in Norway. The model is intended for stability limit calculation where the representation of higher modes is of less importance...

  8. Field performance of timber bridges. 7, Connell Lake stress-laminated deck bridge

    Science.gov (United States)

    L. E. Hislop; M. A. Ritter

    The Connell Lake bridge was constructed in early 1991 on the Tongass National Forest, Alaska, as a demonstration bridge under the Timber Bridge Initiative. The bridge is a stress-laminated deck structure with an approximate 36-ft length and 18-ft width and is the first known stress-laminated timber bridge constructed in Alaska. Performance of the bridge was monitored...

  9. Micro-bridge defects: characterization and root cause analysis

    Science.gov (United States)

    Santoro, Gaetano; Van den Heuvel, Dieter; Braggin, Jennifer; Rosslee, Craig; Leray, Philippe J.; Cheng, Shaunee; Jehoul, Christiane; Schreutelkamp, Robert; Hillel, Noam

    2010-03-01

    Defect review of advanced lithography processes is becoming more and more challenging as feature sizes decrease. Previous studies using a defect review SEM on immersion lithography generated wafers have resulted in a defect classification scheme which, among others, includes a category for micro-bridges. Micro-bridges are small connections between two adjacent lines in photo-resist and are considered device killing defects. Micro-bridge rates also tend to increase as feature sizes decrease, making them even more important for the next technology nodes. Especially because micro-bridge defects can originate from different root causes, the need to further refine and split up the classification of this type of defect into sub groups may become a necessity. This paper focuses on finding the correlation of the different types of micro-bridge defects to a particular root cause based on a full characterization and root cause analysis of this class of defects, by using advanced SEM review capabilities like high quality imaging in very low FOV, Multi Perspective SEM Imaging (MPSI), tilted column and rotated stage (Tilt&Rotation) imaging and Focused Ion Beam (FIB) cross sectioning. Immersion lithography material has been mainly used to generate the set of data presented in this work even though, in the last part of the results, some EUV lithography data will be presented as part of the continuing effort to extend the micro-bridge defect characterization to the EUV technology on 40 nm technology node and beyond.

  10. Application of the multi-dimensional surface water modeling system at Bridge 339, Copper River Highway, Alaska

    Science.gov (United States)

    Brabets, Timothy P.; Conaway, Jeffrey S.

    2009-01-01

    The Copper River Basin, the sixth largest watershed in Alaska, drains an area of 24,200 square miles. This large, glacier-fed river flows across a wide alluvial fan before it enters the Gulf of Alaska. Bridges along the Copper River Highway, which traverses the alluvial fan, have been impacted by channel migration. Due to a major channel change in 2001, Bridge 339 at Mile 36 of the highway has undergone excessive scour, resulting in damage to its abutments and approaches. During the snow- and ice-melt runoff season, which typically extends from mid-May to September, the design discharge for the bridge often is exceeded. The approach channel shifts continuously, and during our study it has shifted back and forth from the left bank to a course along the right bank nearly parallel to the road.Maintenance at Bridge 339 has been costly and will continue to be so if no action is taken. Possible solutions to the scour and erosion problem include (1) constructing a guide bank to redirect flow, (2) dredging approximately 1,000 feet of channel above the bridge to align flow perpendicular to the bridge, and (3) extending the bridge. The USGS Multi-Dimensional Surface Water Modeling System (MD_SWMS) was used to assess these possible solutions. The major limitation of modeling these scenarios was the inability to predict ongoing channel migration. We used a hybrid dataset of surveyed and synthetic bathymetry in the approach channel, which provided the best approximation of this dynamic system. Under existing conditions and at the highest measured discharge and stage of 32,500 ft3/s and 51.08 ft, respectively, the velocities and shear stresses simulated by MD_SWMS indicate scour and erosion will continue. Construction of a 250-foot-long guide bank would not improve conditions because it is not long enough. Dredging a channel upstream of Bridge 339 would help align the flow perpendicular to Bridge 339, but because of the mobility of the channel bed, the dredged channel would

  11. 33 CFR 157.415 - Bridge resource management policy and procedures.

    Science.gov (United States)

    2010-07-01

    ... HOMELAND SECURITY (CONTINUED) POLLUTION RULES FOR THE PROTECTION OF THE MARINE ENVIRONMENT RELATING TO TANK... Petroleum Oils § 157.415 Bridge resource management policy and procedures. (a) Not later than February 1...

  12. Monitoring the dynamic behaviors of the Bosporus Bridge by GPS during Eurasia Marathon

    Directory of Open Access Journals (Sweden)

    H. Erdoğan

    2007-08-01

    Full Text Available Engineering structures, like bridges, dams and towers are designed by considering temperature changes, earthquakes, wind, traffic and pedestrian loads. However, generally, it can not be estimated that these structures may be affected by special, complex and different loads. So it could not be known whether these loads are dangerous for the structure and what the response of the structures would be to these loads. Such a situation occurred on the Bosporus Bridge, which is one of the suspension bridges connecting the Asia and Europe continents, during the Eurasia Marathon on 2 October 2005, in which 75 000 pedestrians participated. Responses of the bridge to loads such as rhythmic running, pedestrian walking, vehicle passing during the marathon were observed by a real-time kinematic (RTK Global Positioning System (GPS, with a 2.2-centimeter vertical accuracy. Observed responses were discussed in both time domain and frequency domain by using a time series analysis. High (0.1–1 Hz and low frequencies (0.00036–0.01172 Hz of observed bridge responses under 12 different loads which occur in different quantities, different types and different time intervals were calculated in the frequency domain. It was seen that the calculated high frequencies are similar, except for the frequencies of rhythmic running, which causes a continuously increasing vibration. Any negative response was not determined, because this rhythmic effect continued only for a short time. Also when the traffic load was effective, explicit changes in the bridge movements were determined. Finally, it was seen that bridge frequencies which were calculated from the observations and the finite element model were harmonious. But the 9th natural frequency value of the bridge under all loads, except rhythmic running could not be determined with observations.

  13. End region detailing of pretensioned concrete bridge girders : [summary].

    Science.gov (United States)

    2013-03-01

    Introduction of the Florida-I Beam (FIB) in 2009 renewed interest in prestressed concrete beam design, especially end region details. In this study, University of Florida researchers examined construction detailing at the FIB end region.

  14. Bridges

    NARCIS (Netherlands)

    Zant, W.

    2017-01-01

    We estimate to what extent bridges in Mozambique lead to transport cost reductions and attribute these reductions to key determinants, in particular road distance, road quality and crossing borders. For identification we exploit the introduction of a road bridge over the Zambezi river, in August

  15. Time-frequency analysis of railway bridge response in forced vibration

    Science.gov (United States)

    Cantero, Daniel; Ülker-Kaustell, Mahir; Karoumi, Raid

    2016-08-01

    This paper suggests the use of the Continuous Wavelet Transform in combination with the Modified Littlewood-Paley basis to analyse bridge responses exited by traversing trains. The analysis provides an energy distribution map in the time-frequency domain that offers a better resolution compared to previous published studies. This is demonstrated with recorded responses of the Skidträsk Bridge, a 36 m long composite bridge located in Sweden. It is shown to be particularly useful to understand the evolution of the energy content during a vehicle crossing event. With this information it is possible to distinguish the effect of several of the governing factors involved in the dynamic response including vehicle's speed and axle configuration as well as non-linear behaviour of the structure.

  16. middle range theory evaluation: bridging the theory-practice gap

    African Journals Online (AJOL)

    The importance underlying the practice of nursing education must continue ... describes selected middle range theory evaluation as a tool for bridging ... engaging in innovative ways of acquiring competency. ..... performances, that guides learners attitudes towards ... Reference knowledge acquired by work experience.

  17. Data of piezoelectric vibration energy harvesting of a bridge undergoing vibration testing and train passage

    Directory of Open Access Journals (Sweden)

    Paul Cahill

    2018-04-01

    Full Text Available The data presented in this article is in relation to the research article “Vibration energy harvesting based monitoring of an operational bridge undergoing forced vibration and train passage” Cahill et al. (2018 [1]. The article provides data on the full-scale bridge testing using piezoelectric vibration energy harvesters on Pershagen Bridge, Sweden. The bridge is actively excited via a swept sinusoidal input. During the testing, the bridge remains operational and train passages continue. The test recordings include the voltage responses obtained from the vibration energy harvesters during these tests and train passages. The original dataset is made available to encourage the use of energy harvesting for Structural Health Monitoring.

  18. Low Cost Wireless Sensor Network for Continuous Bridge monitoring

    DEFF Research Database (Denmark)

    Han, Bo; Kalis, A; Tragas, P

    2012-01-01

    Continuous monitoring wireless sensor networks (WSN) are considered as one of the most promising means to harvest information from large structures in order to assist in structural health monitoring and management. At the same time, continuous monitoring WSNs suffer from limited network lifetimes...

  19. Myocardial Bridging

    Directory of Open Access Journals (Sweden)

    Shi-Min Yuan

    2016-02-01

    Full Text Available Abstract Myocardial bridging is rare. Myocardial bridges are most commonly localized in the middle segment of the left anterior descending coronary artery. The anatomic features of the bridges vary significantly. Alterations of the endothelial morphology and the vasoactive agents impact on the progression of atherosclerosis of myocardial bridging. Patients may present with chest pain, myocardial infarction, arrhythmia and even sudden death. Patients who respond poorly to the medical treatment with β-blockers warrant a surgical intervention. Myotomy is a preferred surgical procedure for the symptomatic patients. Coronary stent deployment has been in limited use due to the unsatisfactory long-term results.

  20. The hepatic bridge.

    Science.gov (United States)

    Sugarbaker, Paul H

    2018-07-01

    The hepatic bridge forms a tunnel of liver parenchyma that may obscure peritoneal metastases associated with the round ligament. Visualization and then resection of nodules associated with this structure is necessary. The incidence of a hepatic bridge and the extent that it covered the round ligament was determined in consecutive patients. Extent of coverage of the round ligament by the hepatic bridge was determined: Class 1 indicates up to one-third of the round ligament obscured, Class 2 up to two-thirds and Class 3 more than two-thirds. In 102 patients in whom the round ligament of the liver could be completely visualized, 50 had a hepatic bridge. Class 1 was 22 (44%) of the bridges, Class 2 was 16 (32%) and Class 3 was 12 (24%). A hepatic bridge was more frequently present in 28 of 45 male patients (62%) vs. 22 of 57 female patients (38%). Approximately one-half of our patients having cytoreductive surgery for peritoneal metastases were observed to have a hepatic bridge. Up to 56% of these patients have Class 2 or 3 hepatic bridge and may require division of the hepatic bridge to completely visualize the contents of the tunnel created by this structure. Copyright © 2018 Elsevier Ltd, BASO ~ The Association for Cancer Surgery, and the European Society of Surgical Oncology. All rights reserved.

  1. Identification of unusual events in multi-channel bridge monitoring data

    Science.gov (United States)

    Omenzetter, Piotr; Brownjohn, James Mark William; Moyo, Pilate

    2004-03-01

    Continuously operating instrumented structural health monitoring (SHM) systems are becoming a practical alternative to replace visual inspection for assessment of condition and soundness of civil infrastructure such as bridges. However, converting large amounts of data from an SHM system into usable information is a great challenge to which special signal processing techniques must be applied. This study is devoted to identification of abrupt, anomalous and potentially onerous events in the time histories of static, hourly sampled strains recorded by a multi-sensor SHM system installed in a major bridge structure and operating continuously for a long time. Such events may result, among other causes, from sudden settlement of foundation, ground movement, excessive traffic load or failure of post-tensioning cables. A method of outlier detection in multivariate data has been applied to the problem of finding and localising sudden events in the strain data. For sharp discrimination of abrupt strain changes from slowly varying ones wavelet transform has been used. The proposed method has been successfully tested using known events recorded during construction of the bridge, and later effectively used for detection of anomalous post-construction events.

  2. Bridge resource program.

    Science.gov (United States)

    2013-09-01

    The mission of Rutgers Universitys Center for Advanced Infrastructure and Transportation (CAIT) Bridge Resource Program (BRP) is to provide bridge engineering support to the New Jersey Department of Transportation (NJDOT)s Bridge Engineering an...

  3. Intelligente Bauwerke

    DEFF Research Database (Denmark)

    Schneider, Ronald; Fischer, Johannes; Straub, Daniel

    girder is formed. This approach accounts for structural redundancies of the continuous box girder with respect to its plastic cross-sectional capacity and its static indeterminacy. To prove the concept, a software prototype has been developed which couples an easy-to-use graphical user interface (front-end......) with a computational engine (back-end). The current version of the prototype implements a model of chloride-induced reinforcement corrosion and a structural model which performs the plastic limit analysis for determining the ultimate capacity of the box girder on the basis of a finite element model. The prototype...

  4. Bridged graphite oxide materials

    Science.gov (United States)

    Herrera-Alonso, Margarita (Inventor); McAllister, Michael J. (Inventor); Aksay, Ilhan A. (Inventor); Prud'homme, Robert K. (Inventor)

    2010-01-01

    Bridged graphite oxide material comprising graphite sheets bridged by at least one diamine bridging group. The bridged graphite oxide material may be incorporated in polymer composites or used in adsorption media.

  5. Laboratory and field testing of an accelerated bridge construction demonstration bridge : US Highway 6 bridge over Keg Creek.

    Science.gov (United States)

    2013-04-01

    The US Highway 6 Bridge over Keg Creek outside of Council Bluffs, Iowa is a demonstration bridge site chosen to put into practice : newly-developed Accelerated Bridge Construction (ABC) concepts. One of these new concepts is the use of prefabricated ...

  6. Guardrails for Use on Historic Bridges: Volume 2—Bridge Deck Overhang Design

    OpenAIRE

    Frosch, Robert J.; Morel, Adam J.

    2016-01-01

    Bridges that are designated historic present a special challenge to bridge engineers whenever rehabilitation work or improvements are made to the bridges. Federal and state laws protect historically significant bridges, and railings on these bridges can be subject to protection because of the role they play in aesthetics. Unfortunately, original railings on historic bridges do not typically meet current crash-test requirements and typically do not meet current standards for railing height and...

  7. Damage Detection in Bridge Structure Using Vibration Data under Random Travelling Vehicle Loads

    International Nuclear Information System (INIS)

    Loh, C H; Hung, T Y; Chen, S F; Hsu, W T

    2015-01-01

    Due to the random nature of the road excitation and the inherent uncertainties in bridge-vehicle system, damage identification of bridge structure through continuous monitoring under operating situation become a challenge problem. Methods for system identification and damage detection of a continuous two-span concrete bridge structure in time domain is presented using interaction forces from random moving vehicles as excitation. The signals recorded in different locations of the instrumented bridge are mixed with signals from different internal and external (road roughness) vibration sources. The damage structure is also modelled as the stiffness reduction in one of the beam element. For the purpose of system identification and damage detection three different output-only modal analysis techniques are proposed: The covariance-driven stochastic subspace identification (SSI-COV), the blind source separation algorithms (called Second Order Blind Identification) and the multivariate AR model. The advantages and disadvantages of the three algorithms are discussed. Finally, the null-space damage index, subspace damage indices and mode shape slope change are used to detect and locate the damage. The proposed approaches has been tested in simulation and proved to be effective for structural health monitoring. (paper)

  8. Dynamic assessment of bridge deck performance considering realistic bridge-traffic interaction

    Science.gov (United States)

    2017-09-01

    Concrete bridge decks are directly exposed to daily traffic loads and may experience some surface cracking caused by excessive stress or fatigue accumulation, which requires repair or replacement. Among typical bridges in North America, bridge decks ...

  9. Cable Supported Bridges

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    Cable supported bridges in the form of suspension bridges and cable-stayed bridges are distinguished by their ability to overcome large spans.The book concentrates on the synthesis of cable supported bridges, covering both design and construction aspects. The analytical part covers simple methods...... to quantify the different structural configurations and allows a preliminary optimization of the main structure.Included are the most recent advances in structural design, corrosion protection of cables, aerodynamic safety, and erection procedures....

  10. GPR signal analysis of post-tensioned prestressed concrete girder defects

    Science.gov (United States)

    Liu, Sixin; Weng, Changnian; Jiao, Pengfei; Wang, Fei; Fu, Lei; Meng, Xu; Lei, Linlin

    2013-06-01

    The accurate inspection of the duct condition in post-tensioned prestressed concrete (PPC) is an essential part of GPR concrete inspection. The purpose is to inspect the grouting condition of the ducts where the strands are located, to find out if there is a void in the ducts, and if any water exists. In order to investigate the radar image characteristics of different PPC duct defects, a number of model girders were manufactured. Three major ducts are included in our study: (1) well grouted and no void (normal condition); (2) the duct is half filled, and the void is filled by water or air; and (3) the duct is not filled at all, and the duct is water or air filled. The data corresponding to seven different situations are acquired and processed. It is found that the radar can detect the first interface in the duct, and the detailed structure inside the duct cannot be ‘seen’ from the images directly. Characteristic curves greatly help the interpretation. A completely void duct is the easiest to differentiate from the others. The signature for this situation is characterized by a strong and clear reflection interface which becomes weaker as the void is water filled. The normal condition shows the weakest reflection interface. As for the half void situation, the front scan shows a similar result to the normal condition whether it is water or air filled, and the back scan shows similar features to the completely void situation. The experiment and analysis is helpful and instructive for practical engineering inspection.

  11. Study on the structural characteristics of extradosed concrete bridges; Ekusutoradozudo kyo no kozo tokusei ni kansuru ichikosatsu

    Energy Technology Data Exchange (ETDEWEB)

    Oka, Y. [Japan Highway Public Corp., Tokyo (Japan); Kasuga, A. [Sumitomo Construction Co. Ltd., Tokyo (Japan); Yamazaki, J. [Nihon Univ., Tokyo (Japan). Coll. of Science and Engineering

    1997-03-31

    Parameters are analyzed to provide data for deciding, in the planning and designing stages, whether a cable stayed bridge or an extradosed bridge should be adopted. Comparative investigation of the vibration properties of both types of bridges is also referred to. The result of the study on the structural properties of the cable stayed road bridge and the extradosed road bridge is introduced. Based on the concept of the extradosed bridge, designers are now able to select without restraint the after load sharing rate of the diagonal members. Parameter analysis of a diagonal member reinforced 3-span continuous beam is performed. By introducing indices showing the load sharing rate of the diagonal member, the cable stayed bridge can be distinguished logically from the extradosed bridge in designing. It is found important that the height of the main tower is set to approximately 10% the length of the center span for the construction of the extradosed bridge. The vibration properties of the cable stayed bridge and the extradosed bridge of the same scale are compared. 7 refs., 18 figs., 6 tabs.

  12. Seismic Analysis for a Crane System

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kang Soo; Lee, Chung Young; Ryu, Jeong Soo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2012-05-15

    The operation bridge used for an open-pool type research reactor is a crane system with a working deck for the handling of in-pool parts such as fuels, reactor components and reactor utilization facilities. The operation bridge allows operators to access the top of the reactor in the reactor pool and the fuel storage racks in the service pool. The operation bridge contains an operating platform mounted on a truck travelling on rails. Upright members are mounted on the truck to support the upper structure and two hoist monorails. The operation bridge consists of two hoists, upper girder frames, legs, cables, saddle frames, upper deck frames, lower deck frames, and the ladder. Static and dynamic analyses are performed to evaluate the structural integrity for the operation bridge for the required design loadings. The response spectrum analysis is employed as a dynamic analysis method

  13. Seismic Analysis for a Crane System

    International Nuclear Information System (INIS)

    Kim, Kang Soo; Lee, Chung Young; Ryu, Jeong Soo

    2012-01-01

    The operation bridge used for an open-pool type research reactor is a crane system with a working deck for the handling of in-pool parts such as fuels, reactor components and reactor utilization facilities. The operation bridge allows operators to access the top of the reactor in the reactor pool and the fuel storage racks in the service pool. The operation bridge contains an operating platform mounted on a truck travelling on rails. Upright members are mounted on the truck to support the upper structure and two hoist monorails. The operation bridge consists of two hoists, upper girder frames, legs, cables, saddle frames, upper deck frames, lower deck frames, and the ladder. Static and dynamic analyses are performed to evaluate the structural integrity for the operation bridge for the required design loadings. The response spectrum analysis is employed as a dynamic analysis method

  14. Bridge Programs in Illinois: Results of the 2010 Illinois Bridge Status Survey

    Science.gov (United States)

    Taylor, J. L.; Harmon, T.

    2010-01-01

    This report provides a summary of major results of the Illinois Bridge Status Survey, administered online between April and June 2010. The purpose of the survey was to understand the extent to which bridge programs are being implemented in Illinois, as well as to build an online directory of bridge programs. Bridge programs are an emerging…

  15. Field performance of timber bridges. 6, Hoffman Run stress-laminated deck bridge

    Science.gov (United States)

    M. A. Ritter; P. D. Hilbrich Lee; G. J. Porter

    The Hoffman Run bridge, located just outside Dahoga, Pennsylvania, was constructed in October 1990. The bridge is a simple-span, single-lane, stress-laminated deck superstructure that is approximately 26 ft long and 16 ft wide. It is the second stress-laminated timber bridge to be constructed of hardwood lumber in Pennsylvania. The performance of the bridge was...

  16. Drill pipe bridge plug

    International Nuclear Information System (INIS)

    Winslow, D.W.; Brisco, D.P.

    1991-01-01

    This patent describes a method of stopping flow of fluid up through a pipe bore of a pipe string in a well. It comprises: lowering a bridge plug apparatus on a work string into the pipe string to a position where the pipe bore is to be closed; communicating the pipe bore below a packer of the bridge plug apparatus through the bridge plug apparatus with a low pressure zone above the packer to permit the fluid to flow up through the bridge plug apparatus; engaging the bridge plug apparatus with an internal upset of the pipe string; while the fluid is flowing up through the bridge plug apparatus, pulling upward on the work string and the bridge plug apparatus and thereby sealing the packer against the pipe bore; isolating the pipe bore below the packer from the low pressure zone above the packer and thereby stopping flow of the fluid up through the pipe bore; disconnecting the work string from the bridge plug apparatus; and maintaining the bridge plug apparatus in engagement with the internal upset and sealed against the pipe bore due to an upward pressure differential applied to the bridge plug apparatus by the fluid contained therebelow

  17. Lifetime fatigue reliability evaluation of short to medium span bridges under site-specific stochastic truck loading

    OpenAIRE

    Yan, Donghuang; Luo, Yuan; Yuan, Ming; Lu, Naiwei

    2017-01-01

    Bridges are vulnerable to the fatigue damage accumulation caused by traffic loading over the service period. A continuous growth in both the vehicle weight and the traffic volume may cause a safety hazard to existing bridges. This study presented a computational framework for probabilistic modeling of the fatigue damage accumulation of short to medium span bridges under actual traffic loading. Stochastic truck-load models were simulated based on site-specific weigh-in-motion measurements. A r...

  18. Bridging Anticoagulation

    Science.gov (United States)

    ... clinical centers in the United States, Canada, and Brazil. A more detailed description of the study is ... Your Personal Message Send Message Share on Social Media Bridging Anticoagulation The BRIDGE Study Investigators Circulation. 2012; ...

  19. Application of lidars for assessment of wind conditions on a bridge site

    DEFF Research Database (Denmark)

    Jakobsen, J. B.; Cheynet, Etienne; Snæbjörnsson, Jonas

    2015-01-01

    Wind measurement techniques based on remote optical sensing, extensively applied in wind energy, have been exploited in civil engineering only in a limited number of studies. The present paper introduces a novel application of wind lidars in bridge engineering, and presents the findings from...... characterization. The paper presents a promising comparison of the measurements obtained by the three different sets of instruments, and discusses their complementary value....... the pilot measurement campaign on the Lysefjord Bridge in the South-West Norway. A single long-range pulsed WindScanner lidar and two short-range continuous-wave WindScanner lidars were deployed, in addition to five sonic anemometers installed on the bridge itself, the latter for long-term wind...

  20. Bridging the Gap

    DEFF Research Database (Denmark)

    Kramer Overgaard, Majken; Broeng, Jes; Jensen, Monika Luniewska

    Bridging the Gap (BtG) is a 2-year project funded by The Danish Industry Foundation. The goal of Bridging the Gap has been to create a new innovation model which will increase the rate at which Danish universities can spinout new technology ventures.......Bridging the Gap (BtG) is a 2-year project funded by The Danish Industry Foundation. The goal of Bridging the Gap has been to create a new innovation model which will increase the rate at which Danish universities can spinout new technology ventures....

  1. Long Span Bridges in Scandinavia

    DEFF Research Database (Denmark)

    Gimsing, Niels Jørgen

    1998-01-01

    The first Scandinavian bridge with a span of more than 500 m was the Lillebælt Suspension Bridge opened to traffic in 1970.Art the end of the 20th century the longest span of any European bridge is found in the Storebælt East Bridge with a main span of 1624 m. Also the third longest span in Europe...... is found in Scandinavia - the 1210 m span of the Höga Kusten Bridge in Sweden.The Kvarnsund Bridge in Norway was at the completion in 1991 the longest cable-stayed bridge in the world, and the span of 530 m is still thge longest for cable-stayed bridges in concrete. The Øresund Bridge with its sapn of 490...

  2. Effect of β on Seismic Vulnerability Curve for RC Bridge Based on Double Damage Criterion

    International Nuclear Information System (INIS)

    Feng Qinghai; Yuan Wancheng

    2010-01-01

    In the analysis of seismic vulnerability curve based on double damage criterion, the randomness of structural parameter and randomness of seismic should be considered. Firstly, the distribution characteristics of structure capability and seismic demand are obtained based on IDA and PUSHOVER, secondly, the vulnerability of the bridge is gained based on ANN and MC and a vulnerability curve according to this bridge and seismic is drawn. Finally, the analysis for a continuous bridge is displayed as an example, and parametric analysis for the effect of β is done, which reflects the bridge vulnerability overall from the point of total probability, and in order to reduce the discreteness, large value of β are suggested.

  3. Bridge deterioration models to support Indiana's bridge management system.

    Science.gov (United States)

    2016-02-01

    An effective bridge management system that is equipped with reliable deterioration models enables agency engineers to carry out : monitoring and long-term programming of bridge repair actions. At the project level, deterioration models help the agenc...

  4. Identification of aeroelastic forces on bridge cables from full-scale measurements

    DEFF Research Database (Denmark)

    Acampora, Antonio; Macdonald, J.H.G.; Georgakis, Christos

    2011-01-01

    Despite much research in recent years, large amplitude vibrations of inclined cables continue to be of concern for cable-stayed bridges. Various mechanisms have been suggested for their excitation, including rain-wind excitation, dry inclined cable galloping, high reduced velocity vortex shedding...... Bridge. The system records wind conditions and weather conditions, as well as accelerations of certain cables and a few locations on the deck and tower. Using state-of-the-art methods of output-only system identification, the vibration modes of the cables have been identified. From these modes...

  5. NASA Operation IceBridge Flies Into the Classroom!

    Science.gov (United States)

    Kane, M.

    2017-12-01

    Field research opportunities for educators is leveraged as an invaluable tool to increase public engagement in climate research and the geosciences. We investigate the influence of educator's authentic fieldwork by highlighting the post-field impacts of a PolarTREC Teacher who participated in two campaigns, including NASA Operation IceBridge campaign over Antarctica in 2016. NASA's Operation IceBridge has hosted PolarTREC teachers since 2012, welcoming five teachers aboard multiple flights over the Arctic and one over Antarctica. The continuity of teacher inclusion in Operation IceBridge campaigns has facilitated a platform for collaborative curriculum development and revision, integration of National Snow and Ice Data Center (NSIDC) data into multiple classrooms, and given us a means whereby students can interact with science team members. I present impacts to my teaching and classrooms as I grapple with "Big Data" to allow students to work directly with lidar and radar data, I examine public outreach impacts through analytics from virtual networking tools including social media, NASA's Mission Tools Suite for Education, and field blog interactions.

  6. The Role of Implantable Cardioverter Defibrillators in Patients Bridged to Transplantation with a Continuous Flow Left Ventricular Assist Device: A Propensity Score Matched Analysis

    Science.gov (United States)

    Clerkin, Kevin J.; Topkara, Veli K.; Mancini, Donna M.; Yuzefpolskaya, Melana; Demmer, Ryan T.; Dizon, Jose M.; Takeda, Koji; Takayama, Hiroo; Naka, Yoshifumi; Colombo, Paolo C.; Garan, A. Reshad

    2016-01-01

    Background Implantable cardioverter defibrillators (ICD) provide a significant mortality benefit for appropriately selected patients with advanced heart failure. ICDs are associated with a mortality benefit when used in patients with a pulsatile left ventricular assist device (LVAD). However it is unclear whether patients with a continuous flow LVAD (CF-LVAD) derive the same benefit. This study sought to determine if the presence of an ICD provided a mortality benefit during CFLVAD support as a bridge to transplantation. Methods Patients were identified in the United Network for Organ Sharing (UNOS) registry that underwent LVAD implantation as bridge to transplantation from May 2004 and April 2014, with follow-up through June 2014. The primary outcome was freedom from death while on CF-LVAD support with adjustment for complications requiring UNOS listing status upgrade. Secondary endpoints included freedom from delisting while on CF-LVAD support and incidence of transplantation. Results 2,990 patients composed the study cohort and propensity score matching identified 1,012 patients with similar propensity scores. There was no difference in survival during device support between patients with and without an ICD (Hazard Ratio [HR] 1.20, 95% Confidence Interval [CI] 0.66-2.17, p=0.55). Adjusting for device complications requiring a UNOS listing status upgrade had minimal influence (HR 1.11, 95% CI 0.60-2.05, p=0.74). There was no increased risk of delisting due to being too sick for those with an ICD (HR 1.08, 95% CI 0.63-1.86, p=0.78). Likewise, the probability of transplantation was similar (HR 1.05, 95% CI 0.87-1.27, p=0.62). Conclusions Among patients bridged to transplantation with a CF-LVAD, the presence of an ICD did not reduce mortality. PMID:28089072

  7. The role of implantable cardioverter defibrillators in patients bridged to transplantation with a continuous-flow left ventricular assist device: A propensity score matched analysis.

    Science.gov (United States)

    Clerkin, Kevin J; Topkara, Veli K; Mancini, Donna M; Yuzefpolskaya, Melana; Demmer, Ryan T; Dizon, Jose M; Takeda, Koji; Takayama, Hiroo; Naka, Yoshifumi; Colombo, Paolo C; Garan, A Reshad

    2017-06-01

    Implantable cardioverter defibrillators (ICDs) provide a significant mortality benefit for appropriately selected patients with advanced heart failure. ICDs are associated with a mortality benefit when used in patients with a pulsatile left ventricular assist device (LVAD). It is unclear whether patients with a continuous-flow LVAD (CF-LVAD) derive the same benefit. We sought to determine if the presence of an ICD provided a mortality benefit during CF-LVAD support as a bridge to transplantation. Patients were identified in the United Network for Organ Sharing (UNOS) registry who underwent LVAD implantation as bridge to transplantation between May 2004 and April 2014, with follow-up through June 2014. Primary outcome was freedom from death while on CF-LVAD support with adjustment for complications requiring UNOS listing status upgrade. Secondary end-points included freedom from delisting while on CF-LVAD support and incidence of transplantation. The study cohort comprised 2,990 patients, and propensity score matching identified 1,012 patients with similar propensity scores. There was no difference in survival during device support between patients with and without an ICD (hazard ratio [HR] = 1.20; 95% confidence interval [CI], 0.66-2.17; p = 0.55). Adjusting for device complications requiring a UNOS listing status upgrade had minimal influence (HR = 1.11; 95% CI, 0.60-2.05; p = 0.74). There was no increased risk of delisting owing to being too sick for patients with an ICD (HR = 1.08; 95% CI, 0.63-1.86; p = 0.78). Likewise, the probability of transplantation was similar (HR = 1.05; 95% CI, 0.87-1.27; p = 0.62). Among patients bridged to transplantation with a CF-LVAD, the presence of an ICD did not reduce mortality. Copyright © 2017 International Society for Heart and Lung Transplantation. Published by Elsevier Inc. All rights reserved.

  8. Remote Performance Monitoring of a Thermoplastic Composite Bridge at Camp Mackall, NC

    Science.gov (United States)

    2011-11-01

    supply air tempera- ture, solar radiation, fan speed, blower currents, ac on/off, refrigerant pressures, Lime-to-comfort • Brakes -line pressure, pedal ...into position using angle bracing was in- stalled to provide the reference surface for the girder deflection measure- ments at the midspan of span 3...an excitation voltage is applied to both sensors, the output voltage is directly proportional to the wind speed and vane angle , respectively. The

  9. 3 long bridges of dream were realized Opening of West Seto Motorway; Yume no 3 kakyo ga jitsugen/nishiseto jidoshado haitsu

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-06-10

    Onomichi-Imabari route/Setouchi Simanami Thruway, which adorned the finish of Honshu-Shikoku projects was completed on 1st, May. With this completion, 3 long bridges of dream were completely realized, following to Kojima-Sakaide (1988) and Kobe-Naruto (1998). This time, 5 bridges of this Motorway, the world's longest cable stayed bridge Tatara Long Bridge, world's first 3 continuous suspension bridge Kurushima Strait No.1{approx}No.3 bridge and New Onomichi Long Bridge, were opened. 10 bridges including 5 bridges (In-noshima Long Bridge, Ikeguchi Bridge, Omishima Bridge, Hakata/Oshima Long Bridge and Oshima Long Bridge) already under service connect 9 islands between Onomichi, Hiroshima Prefecture and Imabari, Ehime Prefecture, with a route 59 km long. Characteristic design was adopted for each bridge to demonstrate world's highest bridge erection technology of Japan. In a series of concrete construction to support superstructure of these bridges, underwater non-segregation type concrete with low hydration heat cement mainly for foundation and substructure, and high fluidity concrete for dense reinforcement layout were adopted. (translated by NEDO)

  10. Existing Steel Railway Bridges Evaluation

    Science.gov (United States)

    Vičan, Josef; Gocál, Jozef; Odrobiňák, Jaroslav; Koteš, Peter

    2016-12-01

    The article describes general principles and basis of evaluation of existing railway bridges based on the concept of load-carrying capacity determination. Compared to the design of a new bridge, the modified reliability level for existing bridges evaluation should be considered due to implementation of the additional data related to bridge condition and behaviour obtained from regular inspections. Based on those data respecting the bridge remaining lifetime, a modification of partial safety factors for actions and materials could be respected in the bridge evaluation process. A great attention is also paid to the specific problems of determination of load-caring capacity of steel railway bridges in service. Recommendation for global analysis and methodology for existing steel bridge superstructure load-carrying capacity determination are described too.

  11. Influence of Pavement on Fatigue Performance of Urban Steel Box Girder Deck

    Directory of Open Access Journals (Sweden)

    Zheng Zhongyue

    2016-01-01

    Full Text Available Based on spatial finite element analysis method, the Influence of pavement on fatigue performance of orthotropic steel deck was analyzed in terms of pavement system, asphalt pavement stiffness. The result shows that compared with asphalt pavement system, RPC pavement system can not only obviously improve the stress condition of steel bridge deck, but also significantly extend the fatigue life of steel bridge panel; Increasing the stiffness of pavement layer can obviously reduce the stress amplitude of fatigue details, especially for direct contact with the pavement.

  12. Field performance of timber bridges. 5, Little Salmon Creek stress-laminated deck bridge

    Science.gov (United States)

    M. A. Ritter; J. A. Kainz; G. J. Porter

    The Little Salmon Creek bridge was constructed in November 1988 on the Allegheny National Forest in Pennsylvania. The bridge is a simple span, single-lane, stress-laminated deck superstructure that is approximately 26-ft long and 16-ft wide. The bridge is unique in that it is the first known stress-laminated timber bridge to be constructed of hardwood lumber. The...

  13. Field performance of timber bridges. 9, Big Erick`s stress-laminated deck bridge

    Science.gov (United States)

    J. A. Kainz; J. P. Wacker; M. Nelson

    The Big Erickas bridge was constructed during September 1992 in Baraga County, Michigan. The bridge is 72 ft long, 16 ft wide, and consists of three simple spans: two stress-laminated deck approach spans and a stress-laminated box center span. The bridge is unique in that it is one of the first known stress-laminated timber bridge applications to use Eastern Hemlock...

  14. Hydraulic modeling of flow impact on bridge structures: a case study on Citarum bridge

    Science.gov (United States)

    Siregar, R. I.

    2018-02-01

    Flood waves because of the rapid catchment response to high intense rainfall, breaches of flood defenses may induce huge impact forces on structures, causing structural damage or even failures. Overflowing stream that passes over the bridge, it means to discharge flood water level is smaller than the capacity of the river flow. In this study, the researches present the methodological approach of flood modeling on bridge structures. The amount of force that obtained because of the hydrostatic pressure received by the bridge at the time of the flood caused the bridge structure disrupted. This paper presents simulation of flow impact on bridge structures with some event flood conditions. Estimating the hydrostatic pressure developed new model components, to quantify the flow impact on structures. Flow parameters applied the model for analyzing, such as discharge, velocity, and water level or head that effect of bridge structures. The simulation will illustrate the capability of bridge structures with some event flood river and observe the behavior of the flow that occurred during the flood. Hydraulic flood modeling use HEC-RAS for simulation. This modeling will describe the impact on bridge structures. Based on the above modelling resulted, in 2008 has flood effect more than other years on the Citarum Bridge, because its flow overflow on the bridge.

  15. Existing Steel Railway Bridges Evaluation

    Directory of Open Access Journals (Sweden)

    Vičan Josef

    2016-12-01

    Full Text Available The article describes general principles and basis of evaluation of existing railway bridges based on the concept of load-carrying capacity determination. Compared to the design of a new bridge, the modified reliability level for existing bridges evaluation should be considered due to implementation of the additional data related to bridge condition and behaviour obtained from regular inspections. Based on those data respecting the bridge remaining lifetime, a modification of partial safety factors for actions and materials could be respected in the bridge evaluation process. A great attention is also paid to the specific problems of determination of load-caring capacity of steel railway bridges in service. Recommendation for global analysis and methodology for existing steel bridge superstructure load-carrying capacity determination are described too.

  16. Effect of soil–structure interaction on the reliability of reinforced concrete bridges

    Directory of Open Access Journals (Sweden)

    Kamel Bezih

    2015-09-01

    Full Text Available In the design of reinforced concrete (RC bridges, the random and nonlinear behavior of soil may lead to insufficient reliability levels. For this reason, it is necessary to take into account the variability of soil properties which can significantly affect the bridge behavior regarding ultimate and serviceability limit states. This study investigates the failure probability for existing reinforced concrete bridges due to the effects of interaction between the soil and the structure. In this paper, a coupled reliability–mechanical approach is developed to study the effect of soil–structure interaction for RC bridges. The modeling of this interaction is incorporated into the mechanical model of RC continuous beams, by considering nonlinear elastic soil stiffness. The reliability analysis highlights the large importance of soil–structure interaction and shows that the structural safety is highly sensitive to the variability of soil properties, especially when the nonlinear behavior of soil is considered.

  17. Consideration of time-evolving capacity distributions and improved degradation models for seismic fragility assessment of aging highway bridges

    International Nuclear Information System (INIS)

    Ghosh, Jayadipta; Sood, Piyush

    2016-01-01

    This paper presents a methodology to develop seismic fragility curves for deteriorating highway bridges by uniquely accounting for realistic pitting corrosion deterioration and time-dependent capacity distributions for reinforced concrete columns under chloride attacks. The proposed framework offers distinct improvements over state-of-the-art procedures for fragility assessment of degrading bridges which typically assume simplified uniform corrosion deterioration model and pristine limit state capacities. Depending on the time in service life and deterioration mechanism, this study finds that capacity limit states for deteriorating bridge columns follow either lognormal distribution or generalized extreme value distributions (particularly for pitting corrosion). Impact of column degradation mechanism on seismic response and fragility of bridge components and system is assessed using nonlinear time history analysis of three-dimensional finite element bridge models reflecting the uncertainties across structural modeling parameters, deterioration parameters and ground motion. Comparisons are drawn between the proposed methodology and traditional approaches to develop aging bridge fragility curves. Results indicate considerable underestimations of system level fragility across different damage states using the traditional approach compared to the proposed realistic pitting model for chloride induced corrosion. Time-dependent predictive functions are provided to interpolate logistic regression coefficients for continuous seismic reliability evaluation along the service life with reasonable accuracy. - Highlights: • Realistic modeling of chloride induced corrosion deterioration in the form of pitting. • Time-evolving capacity distribution for aging bridge columns under chloride attacks. • Time-dependent seismic fragility estimation of highway bridges at component and system level. • Mathematical functions for continuous tracking of seismic fragility along service

  18. Integration of a versatile bridge concept in a 34 GHz pulsed/CW EPR spectrometer

    Science.gov (United States)

    Band, Alan; Donohue, Matthew P.; Epel, Boris; Madhu, Shraeya; Szalai, Veronika A.

    2018-03-01

    We present a 34 GHz continuous wave (CW)/pulsed electron paramagnetic resonance (EPR) spectrometer capable of pulse-shaping that is based on a versatile microwave bridge design. The bridge radio frequency (RF)-in/RF-out design (500 MHz to 1 GHz input/output passband, 500 MHz instantaneous input/output bandwidth) creates a flexible platform with which to compare a variety of excitation and detection methods utilizing commercially available equipment external to the bridge. We use three sources of RF input to implement typical functions associated with CW and pulse EPR spectroscopic measurements. The bridge output is processed via high speed digitizer and an in-phase/quadrature (I/Q) demodulator for pulsed work or sent to a wideband, high dynamic range log detector for CW. Combining this bridge with additional commercial hardware and new acquisition and control electronics, we have designed and constructed an adaptable EPR spectrometer that builds upon previous work in the literature and is functionally comparable to other available systems.

  19. Light-weight aluminium bridges and bridge decks. An overview of recent applications

    NARCIS (Netherlands)

    Maljaars, J.; Soetens, F.; Kluyver, D. de

    2008-01-01

    The last decades have shown a large increase in the application of aluminium alloys for light-weight bridges. For bridge construction, aluminium alloys have some specific advantages, but also some points of attention. This paper deals with some recent projects of aluminium bridges, and for these

  20. Automatic modal identification of cable-supported bridges instrumented with a long-term monitoring system

    Science.gov (United States)

    Ni, Y. Q.; Fan, K. Q.; Zheng, G.; Chan, T. H. T.; Ko, J. M.

    2003-08-01

    An automatic modal identification program is developed for continuous extraction of modal parameters of three cable-supported bridges in Hong Kong which are instrumented with a long-term monitoring system. The program employs the Complex Modal Indication Function (CMIF) algorithm to identify modal properties from continuous ambient vibration measurements in an on-line manner. By using the LabVIEW graphical programming language, the software realizes the algorithm in Virtual Instrument (VI) style. The applicability and implementation issues of the developed software are demonstrated by using one-year measurement data acquired from 67 channels of accelerometers deployed on the cable-stayed Ting Kau Bridge. With the continuously identified results, normal variability of modal vectors caused by varying environmental and operational conditions is observed. Such observation is very helpful for selection of appropriate measured modal vectors for structural health monitoring applications.

  1. Full scale monitoring of wind and traffic induced response of a suspension bridge

    Directory of Open Access Journals (Sweden)

    Cheynet Etienne

    2015-01-01

    Full Text Available This paper presents a full-scale analysis of wind and traffic-induced vibrations of a long-span suspension bridge in complex terrain. Several wind and acceleration sensors have been installed along the main span on Lysefjord Bridge in Norway. In the present study, three days of continuous records are analysed. Traffic-induced vibrations are dominant at low and moderated wind speed, with non-negligible effects on the overall bridge response for heavy vehicles only. Traffic and wind-induced vibrations are compared in terms of root mean square of the acceleration response, and three simples approaches are proposed to isolate records dominated by wind-induced vibration. The first one relies on the separation of nocturnal and diurnal samples. The second one is based on the evaluation of the time-varying root mean square of the acceleration response. The last one evaluates the relative importance of the high frequency domain of the acceleration bridge response. It appears that traffic-induced vibrations may have to be taken into account for the buffeting analysis of long-span bridge under moderated wind.

  2. Determinación de cargas dinámicas de camiones pesados que transitan en un puente basado en algoritmos genéticos e instrumentación Genetic algorithms and instrumentation determination of dynamic loads of heavy trucks over a bridge

    Directory of Open Access Journals (Sweden)

    Edgar Muñoz

    2011-12-01

    Full Text Available Esta investigación determina las cargas por eje de los camiones que circulan por un puente ubicado en una de las vías principales de Colombia, utilizando la técnica de control BWIM (Bridge Weight in Motion, no empleada antes en el País. Nuestro grupo de investigación implementó la Metodología de los Algoritmos genéticos, instrumentación y monitoreo, para el Puente denominado Boquerón en la vía Bogotá - Villavicencio, Colombia. Para ese fin, se instrumentaron cuatro vigas con un sistema electrónico de medición de tráfico en cada carril, además de un sistema de adquisición de datos y ensayos de laboratorio. Desarrollamos la calibración de su modelo estructural y la generación de funciones matemáticas para hacer converger líneas de influencias de cargas con pruebas experimentales y así determinar las cargas en movimiento de los camiones. En adición, se desarrolló una herramienta computacional, capaz de representar con aceptable precisión las cargas en movimiento.This research determines the axle loads of trucks traveling on a bridge located in one of the most important corridors of Colombia, using the technique of control BWIM (Bridge Weight in Motion, not used before in the country. Our research group developed a Genetic Algorithm based in a trial test, implementation and monitoring to the bridge called Boquerón of Colombian Highways (Bogota - Villavicencio. For such an effort, four girders were monitored by data acquisition electronics joined by an electronic traffic log device by lane accompanied of laboratory testing for materials. Model calibration was performed by mathematical approach of in-situ influence lines compared to those obtained by modeling, giving as outcome loads of moving trucks over the bridge. In addition, we developed a computational tool, able to represent with reasonable accuracy the moving loads.

  3. Bridge pier foundation evaluation using cross-hole seismic tomographic imaging

    Science.gov (United States)

    Butchibabu, B.; Sandeep, N.; Sivaram, Y. V.; Jha, P. C.; Khan, P. K.

    2017-09-01

    An ambitious project connecting Jammu and Srinagar through a railway link in tectonically active and geologically complex Himalayan Mountain terrain is under progress. Under this project, the world's highest (359 m) railway arch-bridge is under construction across the River Chenab in the northern territory of India. This mega engineering structure has a two-fold ribbed arch design, comprising of steel girders. During the excavation for one of the concrete pillars on the right abutment, wide open joints and weak/shear zones were noticed. The width of these joints varies from 30 to 50 cm, trending along N170° with a dip of 65°. The foundation area of this pillar is 13 m × 24 m and on the cut slopes of the right bank of Chenab River. These exposed joints and weak zones were treated with consolidation grouting to strengthen the foundation area. To delineate the extent of these joints and weak zones below the foundation level, seismic tomography was carried out in five boreholes drilled for this purpose to cover the 300 sq-m area. The results of cross-hole seismic tomography reveals the presence of three low velocity (≤ 2600 m/s) anomalous zones below the foundation area. This also ascertained the efficacy of grouting in consolidating the joints and weak zones. Later, rock-mass quality (Q) was determined based on the relationship between the P-wave velocity and the Q-value (Barton, 2002) to infer the support system for the slope stabilization below the foundation. 3-D visualization of the seismic velocity demarcates the extent of weak or untreated zones. This methodology facilitates to update the design parameters according to Q-values during the construction stage and estimate the required level of reinforcement and support system. Similar methodology can be applicable in other areas under same site conditions.

  4. Life cycle uses of concrete for more sustainable construction

    Energy Technology Data Exchange (ETDEWEB)

    Horvath, A. [Univ. of California, Berkeley, CA (United States). Dept. of Civil and Environmental Engineering

    2001-07-01

    This paper examined ways in which the environmental burdens of construction in general and concrete production in particular can be reduced. Aggregates for concrete production include sand, gravel and stone. They account for most (80 per cent) of the materials used in the United States. This paper argued that given the fact that environmental concerns are an important social issue, the issue of natural resource conservation should be addressed. Some of the life-cycle assessments and comparative design issues associated with concrete construction were summarized. The author presented the example that often the initial cost of a new pavement application may indicate a lower environmental impact than an equivalent design when asphalt is used over reinforced concrete. However, annualized impacts may result in comparable environmental assessments. The same is true for bridge girders, reinforced concrete also seems to be a better environmental choice than steel. This paper also described end-of-life options that involve the use of waste products and recycled products in concrete and other materials to reduce the overall environmental impacts of a product or facility. This paper was divided into several sections entitled: life cycle assessments; life cycle inventory assessment of concretes and asphalt pavements; and, life cycle inventory assessment of concrete and steel bridge girders. 16 refs., 4 tabs.

  5. Morphological aspects of myocardial bridges.

    Science.gov (United States)

    Lujinović, Almira; Kulenović, Amela; Kapur, Eldan; Gojak, Refet

    2013-11-01

    Although some myocardial bridges can be asymptomatic, their presence often causes coronary disease either through direct compression of the "tunnel" segment or through stimulation and accelerated development of atherosclerosis in the segment proximally to the myocardial bridge. The studied material contained 30 human hearts received from the Department of Anatomy. The hearts were preserved 3 to 5 days in 10% formalin solution. Thereafter, the fatty tissue was removed and arterial blood vessels prepared by careful dissection with special reference to the presence of the myocardial bridges. Length and thickness of the bridges were measured by the precise electronic caliper. The angle between the myocardial bridge fibre axis and other axis of the crossed blood vessel was measured by a goniometer. The presence of the bridges was confirmed in 53.33% of the researched material, most frequently (43.33%) above the anterior interventricular branch. The mean length of the bridges was 14.64 ± 9.03 mm and the mean thickness was 1.23 ± 1.32 mm. Myocardial bridge fibres pass over the descending blood vessel at the angle of 10-90 degrees. The results obtained on a limited sample suggest that the muscular index of myocardial bridge is the highest for bridges located on RIA, but that the difference is not significant in relation to bridges located on other branches. The results obtained suggest that bridges located on other branches, not only those on RIA, could have a great contractive power and, consequently, a great compressive force, which would be exerted on the wall of a crossed blood vessel.

  6. Algorithms for highway-speed acoustic impact-echo evaluation of concrete bridge decks

    Science.gov (United States)

    Mazzeo, Brian A.; Guthrie, W. Spencer

    2018-04-01

    A new acoustic impact-echo testing device has been developed for detecting and mapping delaminations in concrete bridge decks at highway speeds. The apparatus produces nearly continuous acoustic excitation of concrete bridge decks through rolling mats of chains that are placed around six wheels mounted to a hinged trailer. The wheels approximately span the width of a traffic lane, and the ability to remotely lower and raise the apparatus using a winch system allows continuous data collection without stationary traffic control or exposure of personnel to traffic. Microphones near the wheels are used to record the acoustic response of the bridge deck during testing. In conjunction with the development of this new apparatus, advances in the algorithms required for data analysis were needed. This paper describes the general framework of the algorithms developed for converting differential global positioning system data and multi-channel audio data into maps that can be used in support of engineering decisions about bridge deck maintenance, rehabilitation, and replacement (MR&R). Acquisition of position and audio data is coordinated on a laptop computer through a custom graphical user interface. All of the streams of data are synchronized with the universal computer time so that audio data can be associated with interpolated position information through data post-processing. The audio segments are individually processed according to particular detection algorithms that can adapt to variations in microphone sensitivity or particular chain excitations. Features that are greater than a predetermined threshold, which is held constant throughout the analysis, are then subjected to further analysis and included in a map that shows the results of the testing. Maps of data collected on a bridge deck using the new acoustic impact-echo testing device at different speeds ranging from approximately 10 km/h to 55 km/h indicate that the collected data are reasonably repeatable. Use

  7. A software prototype for assessing the reliability of a concrete bridge superstructure subjected to chloride-induced reinforcement corrosion

    DEFF Research Database (Denmark)

    Schneider, Ronald; Thöns, Sebastian; Fischer, Johannes

    2014-01-01

    state of the box girder and a structural model for evaluating the overall system reliability. The condition model is based on a dynamic Bayesian network (DBN) model which considers the spatial variation of the corrosion process. Inspection data are included in the calculation of the system reliability...

  8. Remarks on crack-bridging concepts

    International Nuclear Information System (INIS)

    Bao, G.; Suo, Z.

    1992-01-01

    The article draws upon recent work by us and our colleagues on metal and ceramic matrix composites for high temperature engines. The central theme here is to deduce mechanical properties, such as toughness, strength and notch-ductility, from bridging laws that characterize inelastic processes associated with fracture. A particular set of normalization is introduced to present the design charts, segregating the roles played by the shape, and the scale, of a bridging law. A single material length, γ 0 E/σ 0 , emerges, where γ 0 is the limiting-separation, σ 0 the bridging-strength, and E the Young's modulus of the solid. It is the huge variation of this length-from a few manometers for atomic bond, to a meter for cross-over fibers - that underlies the richness in material behaviors. Under small-scale bridging conditions, γ 0 E/σ 0 is the only basic length scale in the mechanics problem and represents, with a pre-factor about 0.4, the bridging zone size. A catalog of small-scale bridging solutions is compiled for idealized bridging laws. Large-scale bridging introduces a dimensionless group, a/(γ 0 E/σ 0 ), where a is a length characterizing the component. The group plays a major role in all phenomena associated with bridging, and provides a focus of discussion in this article. For example, it quantifies the bridging scale when a is the unbridged crack length, and notch-sensitivity when a is hole radius. The difference and the connection between Irwin's fracture mechanics and crack bridging concepts are discussed. It is demonstrated that fracture toughness and resistance curve are meaningful only when small-scale bridging conditions prevail, and therefore of limited use in design with composites. Many other mechanical properties of composites, such as strength and notch-sensitivity, can be simulated by invoking large-scale bridging concepts. 37 refs., 21 figs., 3 tabs

  9. Safety Analysis of the Patch Load Resistance of Plate Girders: Influence of Model Error and Variability

    Directory of Open Access Journals (Sweden)

    Farzad Shahabian

    2013-12-01

    Full Text Available This study aims to undertake a statistical study to evaluate the accuracy of nine models that have been previously proposed for estimating the ultimate resistance of plate girders subjected to patch loading. For each model, mean errors and standard errors, as well as the probability of underestimating or overestimating patch load resistance, are estimated and the resultant values are compared one to another. Prior to that, the models are initially calibrated in order to improve interaction formulae using an experimental data set collected from the literature. The models are then analyzed by computing design factors associated with a target risk level (probability of exceedance. These models are compared one to another considering uncertainties existed in material and geometrical properties. The Monte Carlo simulation method is used to generate random variables. The statistical parameters of the calibrated models are calculated for various coefficients of variations regardless of their correlation with the random resistance variables. These probabilistic results are very useful for evaluating the stochastic sensitivity of the calibrated models.

  10. Instrument to determine prestress remaining in a damaged bridge girder

    Science.gov (United States)

    Civjan, Scott A.; Jirsa, James O.; Carrasquillo, Ramon L.; Fowler, David W.

    1998-03-01

    An instrument has been developed to estimate stress levels in prestress strands in existing members. The prototype instrument applies a lateral load to an exposed prestressing strand and measures the resulting displacements. The instrument was calibrated for 0.5-inch (12.7 mm) diameter seven-wire strand with exposed lengths of 1.5 feet (0.46 m) to 3.75 feet (1.14 m). It was tested to determine its accuracy, precision, and usefulness in the field. Strand forces were consistently estimated to within ten percent of the actual load. The device was also utilized in the placement of strand splices and was found to be more reliable in checking induced strand tensions than the standard torque wrench method.

  11. 49 CFR 236.312 - Movable bridge, interlocking of signal appliances with bridge devices.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Movable bridge, interlocking of signal appliances with bridge devices. 236.312 Section 236.312 Transportation Other Regulations Relating to... SYSTEMS, DEVICES, AND APPLIANCES Interlocking Standards § 236.312 Movable bridge, interlocking of signal...

  12. Damage assessment of bridge infrastructure subjected to flood-related hazards

    Science.gov (United States)

    Michalis, Panagiotis; Cahill, Paul; Bekić, Damir; Kerin, Igor; Pakrashi, Vikram; Lapthorne, John; Morais, João Gonçalo Martins Paulo; McKeogh, Eamon

    2017-04-01

    Transportation assets represent a critical component of society's infrastructure systems. Flood-related hazards are considered one of the main climate change impacts on highway and railway infrastructure, threatening the security and functionality of transportation systems. Of such hazards, flood-induced scour is a primarily cause of bridge collapses worldwide and one of the most complex and challenging water flow and erosion phenomena, leading to structural instability and ultimately catastrophic failures. Evaluation of scour risk under severe flood events is a particularly challenging issue considering that depth of foundations is very difficult to evaluate in water environment. The continual inspection, assessment and maintenance of bridges and other hydraulic structures under extreme flood events requires a multidisciplinary approach, including knowledge and expertise of hydraulics, hydrology, structural engineering, geotechnics and infrastructure management. The large number of bridges under a single management unit also highlights the need for efficient management, information sharing and self-informing systems to provide reliable, cost-effective flood and scour risk management. The "Intelligent Bridge Assessment Maintenance and Management System" (BRIDGE SMS) is an EU/FP7 funded project which aims to couple state-of-the art scientific expertise in multidisciplinary engineering sectors with industrial knowledge in infrastructure management. This involves the application of integrated low-cost structural health monitoring systems to provide real-time information towards the development of an intelligent decision support tool and a web-based platform to assess and efficiently manage bridge assets. This study documents the technological experience and presents results obtained from the application of sensing systems focusing on the damage assessment of water-hazards at bridges over watercourses in Ireland. The applied instrumentation is interfaced with an open

  13. Improving Bridging from Informatics Practice to Theory.

    Science.gov (United States)

    Lehmann, C U; Gundlapalli, A V

    2015-01-01

    are several lessons learned including the possibility that there may not be direct links between MIM theory and ACI practice articles. ACI editorial policies will continue to evolve to reflect the breadth and depth of the practice of clinical informatics and articles received for publication. Efforts to encourage bridging of informatics practice and theory may be considered by the ACI editors. The lack of direct links from informatics theory-based papers published in MIM in 2014 to papers published in ACI continues as was described for papers published during 2012 to 2013 in the two companion journals. Thus, there is little evidence that theory in MIM has been informed by practice in ACI.

  14. Cooperativity of complex salt bridges

    OpenAIRE

    Gvritishvili, Anzor G.; Gribenko, Alexey V.; Makhatadze, George I.

    2008-01-01

    The energetic contribution of complex salt bridges, in which one charged residue (anchor residue) forms salt bridges with two or more residues simultaneously, has been suggested to have importance for protein stability. Detailed analysis of the net energetics of complex salt bridge formation using double- and triple-mutant cycle analysis revealed conflicting results. In two cases, it was shown that complex salt bridge formation is cooperative, i.e., the net strength of the complex salt bridge...

  15. Timber in Bridge Structures

    OpenAIRE

    Detkin, Viktoria

    2016-01-01

    The purpose of this final year project was to study the properties of timber as a structural material and the suitability of wood in load bearing members for bridge structures. For a case study, an existing timber bridge was selected. Due to its condition the bridge should be replaced. The design of a new bridge with steel beams holding a glulam deck was made. During the case study the replacement of steel beams by glulam timber ones was discussed. Some calculations were made in order to ...

  16. A novel bridge scour monitoring and prediction system

    Science.gov (United States)

    Valyrakis, Manousos; Michalis, Panagiotis; Zhang, Hanqing

    2015-04-01

    Earth's surface is continuously shaped due to the action of geophysical flows. Erosion due to the flow of water in river systems has been identified as a key problem in preserving ecological health but also a threat to our built environment and critical infrastructure, worldwide. As an example, it has been estimated that a major reason for bridge failure is due to scour. Even though the flow past bridge piers has been investigated both experimentally and numerically, and the mechanisms of scouring are relatively understood, there still lacks a tool that can offer fast and reliable predictions. Most of the existing formulas for prediction of bridge pier scour depth are empirical in nature, based on a limited range of data or for piers of specific shape. In this work, the use of a novel methodology is proposed for the prediction of bridge scour. Specifically, the use of an Adaptive Neuro-Fuzzy Inference System (ANFIS) is proposed to estimate the scour depth around bridge piers. In particular, various complexity architectures are sequentially built, in order to identify the optimal for scour depth predictions, using appropriate training and validation subsets obtained from the USGS database (and pre-processed to remove incomplete records). The model has five variables, namely the effective pier width (b), the approach velocity (v), the approach depth (y), the mean grain diameter (D50) and the skew to flow. Simulations are conducted with data groups (bed material type, pier type and shape) and different number of input variables, to produce reduced complexity and easily interpretable models. Analysis and comparison of the results indicate that the developed ANFIS model has high accuracy and outstanding generalization ability for prediction of scour parameters. The effective pier width (as opposed to skew to flow) is amongst the most relevant input parameters for the estimation. Training of the system to new bridge geometries and flow conditions can be achieved by

  17. Research on Energy-Saving Design of Overhead Travelling Crane Camber Based on Probability Load Distribution

    Directory of Open Access Journals (Sweden)

    Tong Yifei

    2014-01-01

    Full Text Available Crane is a mechanical device, used widely to move materials in modern production. It is reported that the energy consumptions of China are at least 5–8 times of other developing countries. Thus, energy consumption becomes an unavoidable topic. There are several reasons influencing the energy loss, and the camber of the girder is the one not to be neglected. In this paper, the problem of the deflections induced by the moving payload in the girder of overhead travelling crane is examined. The evaluation of a camber giving a counterdeflection of the girder is proposed in order to get minimum energy consumptions for trolley to move along a nonstraight support. To this aim, probabilistic payload distributions are considered instead of fixed or rated loads involved in other researches. Taking 50/10 t bridge crane as a research object, the probability loads are determined by analysis of load distribution density functions. According to load distribution, camber design under different probability loads is discussed in detail as well as energy consumptions distribution. The research results provide the design reference of reasonable camber to obtain the least energy consumption for climbing corresponding to different P0; thus energy-saving design can be achieved.

  18. Field performance of timber bridges. 16, North Siwell Road stress-laminated bridge

    Science.gov (United States)

    J. A. Kainz

    The North Siwell Road bridge was constructed during December 1994 in Hinds County, Mississippi. The bridge is a single-span, stress-laminated T-beam structure that measures 9.1 m (30 ft) long and 8.7 m (28.5 ft) wide. Performance of the bridge was monitored for 24 months, beginning at the time of installation. Monitoring involved gathering and evaluating data relative...

  19. Field performance of timber bridges. 10, Sanborn Brook stress-laminated deck bridge

    Science.gov (United States)

    P. D. Hilbrich Lee; J. P. Wacker; M. A. Ritter

    The Sanborn Brook bridge was constructed in August 1991, 10 miles northeast of Concord, New Hampshire, as part of the demonstration timber bridge program of the USDA Forest Service. The bridge is a simple-span, double-lane, stress-laminated deck superstructure constructed from Southern Pine lumber and is approximately 25 ft long and 28 ft wide with a skew of 14 degrees...

  20. Simulation of multivariate diffusion bridges

    DEFF Research Database (Denmark)

    Bladt, Mogens; Finch, Samuel; Sørensen, Michael

    We propose simple methods for multivariate diffusion bridge simulation, which plays a fundamental role in simulation-based likelihood and Bayesian inference for stochastic differential equations. By a novel application of classical coupling methods, the new approach generalizes a previously...... proposed simulation method for one-dimensional bridges to the mulit-variate setting. First a method of simulating approzimate, but often very accurate, diffusion bridges is proposed. These approximate bridges are used as proposal for easily implementable MCMC algorithms that produce exact diffusion bridges...

  1. Steel-soil composite bridge

    DEFF Research Database (Denmark)

    Du, Guangli; Pettersson, Lars; Karoumi, Raid

    2017-01-01

    viability, while their environmental performance is overlooked. Today’s designers are urged to seek new design options to reduce the environmental burdens. Sweden owns more than 24574 bridges and most of them are short spans. Among them, the slab frame bridge (CFB) is a common solution. Soil steel composite...... bridge (SSCB), alternatively, is a functionally equivalent solution to CFB and shows advantages in low cost and easy construction. This paper compares the environmental performance between these two bridge types based on life cycle assessment (LCA). The analysis and result shows that, the SSCB...

  2. Building water bridges in air: Electrohydrodynamics of the floating water bridge

    Science.gov (United States)

    Marín, Álvaro G.; Lohse, Detlef

    2010-12-01

    The interaction of electrical fields and liquids can lead to a phenomenon that defies intuition. Some famous examples can be found in electrohydrodynamics as Taylor cones, whipping jets, or noncoalescing drops. A less famous example is the floating water bridge: a slender thread of water held between two glass beakers in which a high voltage difference is applied. Surprisingly, the water bridge defies gravity even when the beakers are separated at distances up to 2 cm. In this paper, experimental measurements and simple models are proposed and discussed for the stability of the bridge and the source of the flow, revealing an important role of polarization forces on the stability of the water bridge. On the other hand, the observed flow can only be explained due to the non-negligible free charge present in the surface. In this sense, the floating water bridge can be considered as an extreme case of a leaky dielectric liquid [J. R. Melcher and G. I. Taylor, Annu. Rev. Fluid Mech. 1, 111 (1969)].

  3. Monitoring of prestress losses using long-gauge fiber optic sensors

    Science.gov (United States)

    Abdel-Jaber, Hiba; Glisic, Branko

    2017-04-01

    Prestressed concrete has been increasingly used in the construction of bridges due to its superiority as a building material. This has necessitated better assessment of its on-site performance. One of the most important indicators of structural integrity and performance of prestressed concrete structures is the spatial distribution of prestress forces over time, i.e. prestress losses along the structure. Time-dependent prestress losses occur due to dimensional changes in the concrete caused by creep and shrinkage, in addition to strand relaxation. Maintaining certain force levels in the strands, and thus the concrete cross-sections, is essential to ensuring stresses in the concrete do not exceed design stresses, which could cause malfunction or failure of the structure. This paper presents a novel method for monitoring prestress losses based on long-gauge fiber optic sensors embedded in the concrete during construction. The method includes the treatment of varying environmental factors such as temperature to ensure accuracy of results in on-site applications. The method is presented as applied to a segment of a post-tensioned pedestrian bridge on the Princeton University campus, Streicker Bridge. The segment is a three-span continuous girder supported on steel columns, with sensors embedded at key locations along the structure during construction in October 2009. Temperature and strain measurements have been recorded intermittently since construction. The prestress loss results are compared to estimates from design documents.

  4. Evaluation of streambed scour at bridges over tidal waterways in Alaska

    Science.gov (United States)

    Conaway, Jeffrey S.; Schauer, Paul V.

    2012-01-01

    Engineering Center’s River Analysis System model, and scour depths were calculated using methods recommended by the Federal Highway Administration. Computed contraction-scour depths were greater than 2.0 feet at five bridges and computed pier-scour depths were 4.0 feet or greater at 15 bridges. The potential for streambed scour by both coastal and riverine processes at the bridges considered in this study were evaluated, ranked, and summed to determine a cumulative risk factor for each bridge. Possible factors that could mitigate the scour risks were investigated at 22 bridges that had high individual or cumulative rankings. Mitigating factors such as piers founded in bedrock, deep pier foundations relative to scour depths, and lack of observed scour during field measurements were documented for 13 sites, but additional study and monitoring is needed to better quantify the streambed scour potential for nine sites. Three bridges prone to being affected by storm surges will require more data collection and possibly complex hydrodynamic modeling to accurately quantify the streambed scour potential. Continuous monitoring of water-surface and streambed elevation at one or more piers is needed for two bridges to better understand the tidal and riverine influences on streambed scour.

  5. National Bridge Inventory (NBI) Bridges

    Data.gov (United States)

    Department of Homeland Security — The NBI is a collection of information (database) describing the more than 600,000 of the Nation's bridges located on public roads, including Interstate Highways,...

  6. Evaluation of human-induced vibration of continuous footbridges

    Directory of Open Access Journals (Sweden)

    El-Robaa Ahmed

    2015-01-01

    Full Text Available With the development of construction materials and the introduction of high strength steel and concrete, the human-induced vibration became a dominant criterion for the design of pedestrian bridges. Currently, longer spans and lightweight bridges have been comprised in most of design trends. This leads to lower the natural frequencies of the system which have a great effect on the dynamic performance of bridges subjected to human activities. Although the design of steel footbridges could reach the optimum level of design in terms of strength criterion, it might not reach the acceptance level for vibration condition. This will enforce the designer to choose section profiles with higher inertia to enhance stiffness of the whole system. This paper presents an overall assessment for floor vibration problem due to pedestrian induced vertical forces on continuous composite footbridges. The footfall method presented by concrete centre “CCIP-016” is adopted in this study to evaluate the response factor and acceleration of pedestrian bridges using a FEA software package “Robot Structural Analysis”.

  7. Wright-Fisher diffusion bridges.

    Science.gov (United States)

    Griffiths, Robert C; Jenkins, Paul A; Spanò, Dario

    2017-10-06

    The trajectory of the frequency of an allele which begins at x at time 0 and is known to have frequency z at time T can be modelled by the bridge process of the Wright-Fisher diffusion. Bridges when x=z=0 are particularly interesting because they model the trajectory of the frequency of an allele which appears at a time, then is lost by random drift or mutation after a time T. The coalescent genealogy back in time of a population in a neutral Wright-Fisher diffusion process is well understood. In this paper we obtain a new interpretation of the coalescent genealogy of the population in a bridge from a time t∈(0,T). In a bridge with allele frequencies of 0 at times 0 and T the coalescence structure is that the population coalesces in two directions from t to 0 and t to T such that there is just one lineage of the allele under consideration at times 0 and T. The genealogy in Wright-Fisher diffusion bridges with selection is more complex than in the neutral model, but still with the property of the population branching and coalescing in two directions from time t∈(0,T). The density of the frequency of an allele at time t is expressed in a way that shows coalescence in the two directions. A new algorithm for exact simulation of a neutral Wright-Fisher bridge is derived. This follows from knowing the density of the frequency in a bridge and exact simulation from the Wright-Fisher diffusion. The genealogy of the neutral Wright-Fisher bridge is also modelled by branching Pólya urns, extending a representation in a Wright-Fisher diffusion. This is a new very interesting representation that relates Wright-Fisher bridges to classical urn models in a Bayesian setting. Copyright © 2017 Elsevier Inc. All rights reserved.

  8. National Bridge Inventory System (NBI)

    Data.gov (United States)

    Department of Transportation — The NBI System is the collection of bridge inspection information and costs associated with bridge replacements of structurally deficient bridges on and off the NHS....

  9. Field dynamic testing on a Cyprus concrete highway bridge using Wireless Sensor Network (WSN)

    Science.gov (United States)

    Votsis, Renos A.; Kyriakides, Nicholas; Tantele, Elia A.; Chrysostomou, Christis Z.; Onoufriou, Toula

    2014-08-01

    The aims of the bridge management authorities are to ensure that bridges fulfil their purpose and functionality during their design life. So, it is important to identify and quantify the deterioration of the structural condition early so that a timely application of an intervention will avoid more serious problems and increased costs at a later stage. A measure to enhance the effectiveness of the existing structural evaluation by visual inspection is instrumental monitoring using sensors. The activities performed in this process belong to the field of Structural Health Monitoring (SHM). The SHM offers opportunities for continuous or periodic monitoring on bridges and technological advances allow nowadays the employment of wireless sensors networks (WSN) for this task. A SHM application using WSN was implemented on a multi-span reinforced concrete (RC) highway bridge in Limassol with the objective to study its dynamic characteristics and performance. Part of the specific bridge will be replaced and this offered a unique opportunity for measurements before and after construction so that apparent changes in the dynamic characteristics of the bridge will be identified after the repairing work. The measurements provided indications on the frequencies and mode shapes of the bridge and the response amplitude during the passing of traffic. The latter enabled the investigation of the dependency of the bridge's structural damping to the amplitude of vibration induced by the passing of traffic. The results showed that as the excitation increases the magnitude of modal damping increases as well.

  10. River meander modeling of the Wabash River near the Interstate 64 Bridge near Grayville, Illinois

    Science.gov (United States)

    Lant, Jeremiah G.; Boldt, Justin A.

    2018-01-16

    Natural river channels continually evolve and change shape over time. As a result, channel evolution or migration can cause problems for bridge structures that are fixed in the flood plain. A once-stable bridge structure that was uninfluenced by a river’s shape could be encroached upon by a migrating river channel. The potential effect of the actively meandering Wabash River on the Interstate 64 Bridge at the border with Indiana near Grayville, Illinois, was studied using a river migration model called RVR Meander. RVR Meander is a toolbox that can be used to model river channel meander migration with physically based bank erosion methods. This study assesses the Wabash River meandering processes through predictive modeling of natural meandering over the next 100 years, climate change effects through increased river flows, and bank protection measures near the Interstate 64 Bridge.

  11. Influence of molybdenum content on transformation behavior of high performance bridge steel during continuous cooling

    International Nuclear Information System (INIS)

    Chen, Jun; Tang, Shuai; Liu, Zhenyu; Wang, Guodong

    2013-01-01

    Highlights: ► The bainite transformation field was refined. ► The empirical equation to estimate the GF s was established. ► Transformation behavior was studied with serially increasing Mo addition. ► The molybdenum content can be lowered as the cooling rate is increased. ► GF transformation field is also shifted to right by increasing Mo content. - Abstract: The continuous-cooling-transformation (CCT) diagrams of high performance bridge steel with different molybdenum content were plotted by means of a combined method of dilatometry and metallography. The results show that the molybdenum addition of 0.17 wt% does not noticeably alter the transformation behavior, whereas 0.38 wt% significantly. In addition, the molybdenum addition of 0.38 wt% completely eliminates the formation of polygonal ferrite (PF) and significantly lower the granular ferrite (GF) transformation starting temperatures throughout the range of cooling rates studied. At lower cooling rates, with the increase of the molybdenum content, the martensite/austenite (M/A) constituents are noticeably refined, whereas the effects are not obvious at higher cooling rates. Moreover, the molybdenum addition of 0.38 wt% can significantly increase the Vickers hardness, but the Vickers hardness increments (by comparison of Mo-0.17wt% steel and Mo-0.38wt% steel) are sharply reduced at the cooling rate of 30 °C/s, indicating that at higher cooling rate, the molybdenum usage can be saved and the higher strengthen can be also gained. It could be found the GF transformation starting temperature is linear with the cooling rate. The empirical equation was established to calculate GF transformation starting temperatures, and the calculated values are in good agreement with measured ones

  12. Field performance of timber bridges. 15, Pueblo County, Colorado, stress-laminated deck bridge

    Science.gov (United States)

    L. E. Hislop

    The Pueblo County 204B bridge was constructed in March 1990 in Pueblo, Colorado, as a demonstration bridge under the USDA Forest Service Timber Bridge Initiative. The stress-laminated deck superstructure is approximately 10 m long, 9 m wide, and 406 mm deep, with a skew of 10 degrees. Performance monitoring was conducted for 3 years, beginning at...

  13. Principles of Bridge Reliability

    DEFF Research Database (Denmark)

    Thoft-Christensen, Palle; Nowak, Andrzej S.

    The paper gives a brief introduction to the basic principles of structural reliability theory and its application to bridge engineering. Fundamental concepts like failure probability and reliability index are introduced. Ultimate as well as serviceability limit states for bridges are formulated......, and as an example the reliability profile and a sensitivity analyses for a corroded reinforced concrete bridge is shown....

  14. Bridge Testing With Ground-Based Interferometric Radar: Experimental Results

    International Nuclear Information System (INIS)

    Chiara, P.; Morelli, A.

    2010-01-01

    The research of innovative non-contact techniques aimed at the vibration measurement of civil engineering structures (also for damage detection and structural health monitoring) is continuously directed to the optimization of measures and methods. Ground-Based Radar Interferometry (GBRI) represents the more recent technique available for static and dynamic control of structures and ground movements.Dynamic testing of bridges and buildings in operational conditions are currently performed: (a) to assess the conformity of the structure to the project design at the end of construction; (b) to identify the modal parameters (i.e. natural frequencies, mode shapes and damping ratios) and to check the variation of any modal parameters over the years; (c) to evaluate the amplitude of the structural response to special load conditions (i.e. strong winds, earthquakes, heavy railway or roadway loads). If such tests are carried out by using a non-contact technique (like GBRI), the classical issues of contact sensors (like accelerometers) are easily overtaken.This paper presents and discusses the results of various tests carried out on full-scale bridges by using a Stepped Frequency-Continuous Wave radar system.

  15. Bridge Testing With Ground-Based Interferometric Radar: Experimental Results

    Science.gov (United States)

    Chiara, P.; Morelli, A.

    2010-05-01

    The research of innovative non-contact techniques aimed at the vibration measurement of civil engineering structures (also for damage detection and structural health monitoring) is continuously directed to the optimization of measures and methods. Ground-Based Radar Interferometry (GBRI) represents the more recent technique available for static and dynamic control of structures and ground movements. Dynamic testing of bridges and buildings in operational conditions are currently performed: (a) to assess the conformity of the structure to the project design at the end of construction; (b) to identify the modal parameters (i.e. natural frequencies, mode shapes and damping ratios) and to check the variation of any modal parameters over the years; (c) to evaluate the amplitude of the structural response to special load conditions (i.e. strong winds, earthquakes, heavy railway or roadway loads). If such tests are carried out by using a non-contact technique (like GBRI), the classical issues of contact sensors (like accelerometers) are easily overtaken. This paper presents and discusses the results of various tests carried out on full-scale bridges by using a Stepped Frequency-Continuous Wave radar system.

  16. Effectiveness of Tuned Mass Dampers in Seismic Response Control of Isolated Bridges Including Soil-Structure Interaction

    Directory of Open Access Journals (Sweden)

    Said Elias

    Full Text Available Abstract The effect of soil-structure interaction (SSI on the dynamic responses of seismically isolated three-span continuous reinforced concrete (RC bridge is investigated. Also, tuned mass damper(s (TMD/s is/are installed to control undesirable bearing displacement, even under the SSI effect. The TMDs are placed at the mid-span of the bridge and each tuned with a modal frequency, while controlling up to first few modes as desirable. The soil surrounding the foundation of pier is modeled by frequency independent coefficients. Dynamic analysis is carried out in time domain using direct integration method. In order to specify the effects of the SSI, the responses of the non-isolated, isolated, and controlled isolated bridge are compared. It is observed that the soil surrounding the pier has significant effects on the bearing displacement of the isolated RC bridges. In addition, it is observed that the seismic responses of isolated RC bridge reduced significantly with installation of the TMDs.

  17. Dynamic analysis program for frame structure

    International Nuclear Information System (INIS)

    Ando, Kozo; Chiba, Toshio

    1975-01-01

    A general purpose computer program named ISTRAN/FD (Isub(HI) STRucture ANalysis/Frame structure, Dynamic analysis) has been developed for dynamic analysis of three-dimensional frame structures. This program has functions of free vibration analysis, seismic response analysis, graphic display by plotter and CRT, etc. This paper introduces ISTRAN/FD; examples of its application are shown with various problems : idealization of the cantilever, dynamic analysis of the main tower of the suspension bridge, three-dimensional vibration in the plate girder bridge, seismic response in the boiler steel structure, and dynamic properties of the underground LNG tank. In this last example, solid elements, in addition to beam elements, are especially used for the analysis. (auth.)

  18. Field performance of timber bridges. 8, Lynches Woods Park stress-laminated deck bridge

    Science.gov (United States)

    J. P. Wacker; M. A. Ritter; D. Conger

    The Lynches Woods Park bridge was constructed during the summer of 1990 in Newberry, South Carolina. It is a single-span, single-lane, stress-laminated deck superstructure that measures approximately 30 ft long, 16 ft wide, and 14 in. deep. The bridge is unique in that is one of the first known stress-laminated deck bridges to be constructed of Southern Pine lumber...

  19. Salt-bridge energetics in halophilic proteins.

    Science.gov (United States)

    Nayek, Arnab; Sen Gupta, Parth Sarthi; Banerjee, Shyamashree; Mondal, Buddhadev; Bandyopadhyay, Amal K

    2014-01-01

    Halophilic proteins have greater abundance of acidic over basic and very low bulky hydrophobic residues. Classical electrostatic stabilization was suggested as the key determinant for halophilic adaptation of protein. However, contribution of specific electrostatic interactions (i.e. salt-bridges) to overall stability of halophilic proteins is yet to be understood. To understand this, we use Adaptive-Poison-Boltzmann-Solver Methods along with our home-built automation to workout net as well as associated component energy terms such as desolvation energy, bridge energy and background energy for 275 salt-bridges from 20 extremely halophilic proteins. We then perform extensive statistical analysis on general and energetic attributes on these salt-bridges. On average, 8 salt-bridges per 150 residues protein were observed which is almost twice than earlier report. Overall contributions of salt-bridges are -3.0 kcal mol-1. Majority (78%) of salt-bridges in our dataset are stable and conserved in nature. Although, average contributions of component energy terms are equal, their individual details vary greatly from one another indicating their sensitivity to local micro-environment. Notably, 35% of salt-bridges in our database are buried and stable. Greater desolvation penalty of these buried salt-bridges are counteracted by stable network salt-bridges apart from favorable equal contributions of bridge and background terms. Recruitment of extensive network salt-bridges (46%) with a net contribution of -5.0 kcal mol-1 per salt-bridge, seems to be a halophilic design wherein favorable average contribution of background term (-10 kcal mol-1) exceeds than that of bridge term (-7 kcal mol-1). Interiors of proteins from halophiles are seen to possess relatively higher abundance of charge and polar side chains than that of mesophiles which seems to be satisfied by cooperative network salt-bridges. Overall, our theoretical analyses provide insight into halophilic signature in its

  20. Bridge the Gap

    DEFF Research Database (Denmark)

    Marselis, Randi

    2017-01-01

    This article focuses on photo projects organised for teenage refugees by the Society for Humanistic Photography (Berlin, Germany). These projects, named Bridge the Gap I (2015), and Bridge the Gap II (2016), were carried out in Berlin and brought together teenagers with refugee and German...