WorldWideScience

Sample records for construction work in progress

  1. 18 CFR 367.1070 - Account 107, Construction work in progress.

    Science.gov (United States)

    2010-04-01

    ... NATURAL GAS ACT Balance Sheet Chart of Accounts § 367.1070 Account 107, Construction work in progress. (a) This account must include the total of the balances of construction projects for service company..., Construction work in progress. 367.1070 Section 367.1070 Conservation of Power and Water Resources FEDERAL...

  2. 17 CFR 256.107 - Construction work in progress.

    Science.gov (United States)

    2010-04-01

    ... UTILITY HOLDING COMPANY ACT OF 1935 Balance Sheet Accounts: Assets and Other Debit Accounts § 256.107 Construction work in progress. This account shall include the total of the balances of work orders for service company property in process of construction. Work orders shall be cleared from this account as soon as...

  3. Excavation of shafts and research galleries at the Mizunami Underground Research Laboratory. Construction work of MIU part 4. Construction progress report, fiscal year 2010-2011

    International Nuclear Information System (INIS)

    2014-11-01

    This progress report presents an outline compilation of construction activities, primary tasks performed, construction progress and safety patrol report, in fiscal year 2010-2011. The outline of construction activities is a summary based on the scope of work planned in 2010-2011: the main activities are based on the Tono Geoscience Center weekly reports; and the construction progress is based on the planned and actual schedules. The safety patrol report is based on defects recording by the safety manager of the Geoscience Facility Construction Section. Regarding the plan and actual performance of the construction work of MIU part IV (March 16, 2010 - March 15, 2012) performance carried out from April 1, 2010 until March 15, 2012 is described in this report. The attached appendices have been provided: regarding content in the excavated material bellowing the environmental standards, technical specifications of fiscal year 2010-2011 in construction work of MIU part IV, also photos of construction activities. (author)

  4. Construction Progress Control (CPC) application for smartphones

    OpenAIRE

    Garcia Garcia, Jordi Carles

    2011-01-01

    Construction inspectors usually use notebooks or laptops to take notes on the construction site about how the tasks are progressing and any other relevant information. Later, when they are in the office they format this information and send it to the scheduler. This way of working wastes time and resources and could be optimized with a new technology already on the market: smartphones.

  5. Construction progress of the cooling & ventilation in the LHC project

    CERN Document Server

    Body, Y; Josa, F; Monsted, A; Pirollet, B; CERN. Geneva. ST Division

    2002-01-01

    After the LEP dismantling Phase the Cooling and Ventilation Group has started the LHC construction work. Year 2001 through to 2004 will certainly be the most important period of activity for the CV group in the erection phase The author will report on the current works that are in progress on the different LHC Points distinguishing between the Ventilation and the Water Cooling installations. The Ventilation work completed in the new surface buildings in Points 1, 4,5,6 and 8. The work for the Cooling plants comprehend to the pumping stations, the cooling towers and the chilled water production stations in Points 1 and 5, For all of these activities, an updated report of the progress the work, the planning and of the expenses are given. Finally, a brief overview of the future activities is presented.

  6. Potential of Progressive Construction Systems in Slovakia

    Science.gov (United States)

    Kozlovska, Maria; Spisakova, Marcela; Mackova, Daniela

    2017-10-01

    Construction industry is a sector with rapid development. Progressive technologies of construction and new construction materials also called modern methods of construction (MMC) are developed constantly. MMC represent the adoption of construction industrialisation and the use of prefabrication of components in building construction. One of these modern methods is also system Varianthaus, which is based on, insulated concrete forms principle and provides complete production plant for wall, ceiling and roof elements for a high thermal insulation house construction. Another progressive construction system is EcoB, which represents an insulated precast concrete panel based on combination of two layers, insulation and concrete, produced in a factory as a whole. Both modern methods of construction are not yet known and wide-spread in the Slovak construction market. The aim of this paper is focused on demonstration of MMC using potential in Slovakia. MMC potential is proved based on comparison of the selected parameters of construction process - construction costs and construction time. The subject of this study is family house modelled in three material variants - masonry construction (as a representative of traditional methods of construction), Varianthaus and EcoB (as the representatives of modern methods of construction). The results of this study provide the useful information in decision-making process for potential investors of construction.

  7. Progressively engaging: constructing nurse, patient, and family relationships in acute care settings.

    Science.gov (United States)

    Segaric, Cheryl Ann; Hall, Wendy A

    2015-02-01

    In this grounded theory study, informed by symbolic interactionism, we explain how nurses, patients, and family members construct relationships in acute care settings, including managing effects of work environments. We recruited participants from 10 acute care units across four community hospitals in a Western Canadian city. From 33 hr of participant observation and 40 interviews with 13 nurses, 17 patients, and 10 family members, we constructed the basic social-psychological process of progressively engaging. Nurses, patients, and family members approached constructing relationships through levels of engagement, ranging from perspectives about "just doing the job" to "doing the job with heart." Progressively engaging involved three stages: focusing on tasks, getting acquainted, and building rapport. Workplace conditions and personal factors contributed or detracted from participants' movement through the stages of the process; with higher levels of engagement, participants experienced greater satisfaction and cooperation. Progressively engaging provides direction for how all participants in care can invest in relationships. © The Author(s) 2014.

  8. Construal operations of the English progressive construction

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard

    2011-01-01

    present paper provides an overview of construal operations that are likely to be at play in the construction of the aspectual and actional meaning components of the progressive construction. The discussion also involves instances of the progressive construction, which display low semantic compatibility...

  9. Port construction works in the Sendai Nuclear Power Station

    International Nuclear Information System (INIS)

    Narahara, Akio; Minamata, Hisashi; Harada, Kensaku

    1982-01-01

    Sendai Nuclear Power Station is the second nuclear power station of Kyushu Electric Power Co., Inc., with two PWR plants of 890 MW each, and the operation of No.1 plant will be started in July, 1984, and that of No.2 plant in March, 1986. The civil engineering works for both plants were started in June, 1978, and March, 1981, respectively, and the rate of progress as of the end of September, 1982, was 97 % and 66 %, respectively. In the construction of this power station, the port facility was provided for the transport of construction materials and spent fuel, and for the intake of condenser cooling water. In order to make the construction by dry work, the double cofferdam structures with steel sheet piles were made offshore. The use of the wharf was started in March, 1980, though typhoons hit the area several times, and the dredging in the port was completed in May, 1982. The outline of the plan of this power station, the state of affairs before the start of construction, the outline of the port construction works, the topography, geological features and sea conditions, the design of the port such as breakwaters, unloading wharf and water intake, the manufacture and installation of caissons, dredging, and the temporary cofferdam works for water intake are described. (author)

  10. The Waste Treatment Plant, a Work in Progress

    International Nuclear Information System (INIS)

    Hamel, W. F. Jr.; Duncan, G. M.

    2006-01-01

    There are many challenges in the design and construction of Department of Energy's (DOE) Waste Treatment and Immobilization Plant (WTP) at the Hanford site. The plant is being built to process some 55 million gallons of radioactive waste from 177 underground tanks. Engineering and construction are progressing on this largest project in the DOE complex. This paper describes some of WTP's principal recent challenges and opportunities and how they are being addressed to minimize impact on the project, enhance the capabilities of the facilities, and reduce risk. A significant new development in 2005 was the need to account for higher seismic accelerations than originally specified for the facility structures and equipment. Efforts have centered on continuing design and construction with minimal risk, while the final seismic design spectra was developed. Other challenges include development of an alternative cesium ion exchange resin to minimize the risk from reliance on a single product, implementing advanced analytical techniques to improve laboratory performance, adopting a thinner walled high level waste (HLW) canister to reduce waste volume and mission duration, and commissioning a comprehensive external flowsheet review of the design, along with its underpinning technologies, and projected plant operability. These challenges make it clear that WTP is a work in progress, but the challenges are being successfully resolved as the design and construction move on to completion. (authors)

  11. Progress in resolving construction issues on nuclear projects

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1985-01-01

    The cost of nuclear plant construction in the United States can be drastically reduced. Progress is being made in the reduction of construction costs and with continuing effort much more can be done. The easiest way to attack high costs is to eliminate the unnecessary repairs and rework in construction, along with the time consuming evaluations and dispositions, and to use common sense in design practices. By doing this, millions of dollars could easily be cut from the cost of construction of nuclear powerplants

  12. Development of a group work assessment pedagogy using constructive alignment theory.

    Science.gov (United States)

    Croy, Suzanne R

    2018-02-01

    The purpose of this paper is to explore group work assessment underpinned by constructive alignment theory to develop a new assessment pedagogy. A review was undertaken of an existing module 'Mental Health Nursing 1', with student nurses participating in the BSc (Hons) Nursing Programme. Constructive alignment theory requires teachers to adopt a deep approach to learning where module learning outcomes are aligned with the teaching environment and modes of assessment. As the module progressed, reviewing the Mental Health Nursing 1 module became an excellent opportunity to begin to understand how constructive alignment theory can inform a group work assessment pedagogy. Working using a constructively aligned assessment process became a valuable learning experience for the module leader whilst at the same time revealed a gap in the research around the impact of constructively aligned teaching and group work assessment. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. Excavation of shafts and research galleries at the Mizunami Underground Research Laboratory (MIU). Construction progress report, fiscal year 2006

    International Nuclear Information System (INIS)

    2012-12-01

    This progress report presents an outline compilation of construction activities, primary tasks performed, construction progress and problems reported in Fiscal Year 2006. The outline of construction activities is a summary based on the scope of work planned in 2006. The main activities are based on the Tono Geoscience Center weekly reports. The construction progress is based on the planned and actual schedules and the Tono Geoscience Center weekly reports. The problems reported are based on accident reports, natural disasters, nonconformance and defects recorded by the safety manager of the Geoscience Facility Construction Section. Construction plan of the MIU construction project No.2 (started on July 1, 2006) is described in this report. Regarding the plan and actual performance of MIU construction project No.1 (completed on June 30, 2006), it is described inConstruction Progress Report from Fiscal Year 2002 to Fiscal Year 2005(including a part of Fiscal Year 2006)”. The following appendices are attached: construction plan, risk assessment reports, the photos of construction activities and technical specifications of the construction project No.2. (author)

  14. A Duration Prediction Using a Material-Based Progress Management Methodology for Construction Operation Plans

    Directory of Open Access Journals (Sweden)

    Yongho Ko

    2017-04-01

    Full Text Available Precise and accurate prediction models for duration and cost enable contractors to improve their decision making for effective resource management in terms of sustainability in construction. Previous studies have been limited to cost-based estimations, but this study focuses on a material-based progress management method. Cost-based estimations typically used in construction, such as the earned value method, rely on comparing the planned budget with the actual cost. However, accurately planning budgets requires analysis of many factors, such as the financial status of the sectors involved. Furthermore, there is a higher possibility of changes in the budget than in the total amount of material used during construction, which is deduced from the quantity take-off from drawings and specifications. Accordingly, this study proposes a material-based progress management methodology, which was developed using different predictive analysis models (regression, neural network, and auto-regressive moving average as well as datasets on material and labor, which can be extracted from daily work reports from contractors. A case study on actual datasets was conducted, and the results show that the proposed methodology can be efficiently used for progress management in construction.

  15. Progress Report on the Construction of SOLEIL

    CERN Document Server

    Level, Marie Paule; Brunelle, Pascale; Chaput, Roger; Dael, Antoine; Denard, Jean-Claude; Filhol, Jean-Marc; Godefroy, Jean-Marie; Herbeaux, Christian; Le Roux, V; Marchand, Patrick; Nadji, Amor; Nadolski, Laurent S; Nagaoka, Ryutaro; Tordeux, M A

    2005-01-01

    This paper reports the progress achieved in the construction of the accelerators of SOLEIL. Started in January 2002, the construction comes near to its end and the installation of the equipment on the site has begun from September 2004 and shall be completed within one year. The progress on the LINAC and Booster are reported separately, therefore this paper will focus more particularly on the Storage Ring: Dedicated measuring benches have been built to perform the magnetic measurements on all the magnets and the results of measurements have been analysed in term of particle dynamics behaviour in order to prepare the operating point for the commissioning. The status of innovative developments engaged from the beginning as super-conducting RF cavities, NEG coated vacuum chambers and BPMs digital electronics will be described. The construction of the first 6 insertion devices is also well advanced and will be reported. Finally, the machine impedance budget was further evaluated with consequently, still some modi...

  16. Construction works of large scale impervious wall in construction of No.2 plant in Onagawa Nuclear Power Station, Tohoku Electric Power Co., Inc

    International Nuclear Information System (INIS)

    Ueda, Kozaburo; Sugeno, Yoshisada; Takahashi, Hitoshi

    1991-01-01

    The main buildings for No. 2 plant in Onagawa Nuclear Power Station are constructed on the bedrocks about 14 m below the sea surface. Therefore, for the purpose of executing the works by shutting seawater off and dry work, the large scale impervious wall of about 500 m extension was installed underground. The feature of this impervious wall is the depth of embedment of about 3 m into the hard bedrocks having the uniaxial compressive strength of 2000 kg/cm 2 at maximum, carried out with the newly developed hard rock excavator. The outline of these construction works is reported. No. 2 plant in Onagawa Nuclear Power Station is the BWR plant of 825 MWe output. The construction works of the power station were began in August, 1989, and the rate of progress in civil engineering works as of the end of September, 1990 was 21.3%. The planning of the impervious wall, the geological features at the site, the method of shutting seawater off, the selection of wall materials, the design of the wall body, the investigation of the quantity of spring water, the execution of the construction and execution management, and the confirmation of the effect of the wall are reported. (K.I.)

  17. The application of micro UAV in construction project

    Science.gov (United States)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  18. Progression in work readiness

    DEFF Research Database (Denmark)

    Jensen, Sophie Danneris

    2013-01-01

    This paper is based partly on literature concerning the construction of identities in social work settings (especially Juhila & Abrams 2011, Eskelinen & Olesen 2010) and partly on literature that addresses the dilemmas and challenges in providing evidence about the effectiveness of interventions...... in social work programs (amongst others Boaz & Blewett 2010 and Koivisto 2008). Initially there will be a short presentation of the research topic of my Ph.D. and the central research question related to the project. Following this is a methodological discussion in two levels - the first discussion...... be understood through short narratives about work identity....

  19. Tracking the follow-up of work in progress papers.

    Science.gov (United States)

    Mubin, Omar; Arsalan, Mudassar; Al Mahmud, Abdullah

    2018-01-01

    Academic conferences offer numerous submission tracks to support the inclusion of a variety of researchers and topics. Work in progress papers are one such submission type where authors present preliminary results in a poster session. They have recently gained popularity in the area of Human Computer Interaction (HCI) as a relatively easier pathway to attending the conference due to their higher acceptance rate as compared to the main tracks. However, it is not clear if these work in progress papers are further extended or transitioned into more complete and thorough full papers or are simply one-off pieces of research. In order to answer this we explore self-citation patterns of four work in progress editions in two popular HCI conferences (CHI2010, CHI2011, HRI2010 and HRI2011). Our results show that almost 50% of the work in progress papers do not have any self-citations and approximately only half of the self-citations can be considered as true extensions of the original work in progress paper. Specific conferences dominate as the preferred venue where extensions of these work in progress papers are published. Furthermore, the rate of self-citations peaks in the immediate year after publication and gradually tails off. By tracing author publication records, we also delve into possible reasons of work in progress papers not being cited in follow up publications. In conclusion, we speculate on the main trends observed and what they may mean looking ahead for the work in progress track of premier HCI conferences.

  20. Infection control in design and construction work.

    Science.gov (United States)

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  1. Mechanisation and automation technologies development in work at construction sites

    Science.gov (United States)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  2. 29 CFR 1910.12 - Construction work.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 5 2010-07-01 2010-07-01 false Construction work. 1910.12 Section 1910.12 Labor... Construction work. (a) Standards. The standards prescribed in part 1926 of this chapter are adopted as... provisions thereof, to every employment and place of employment of every employee engaged in construction...

  3. The Work Ability of Hong Kong Construction Workers in Relation to Individual and Work-Related Factors.

    Science.gov (United States)

    Ng, Jacky Y K; Chan, Alan H S

    2018-05-14

    The shortage in Hong Kong of construction workers is expected to worsen in future due to the aging population and increasing construction activity. Construction work is dangerous and to help reduce the premature loss of construction workers due to work-related disabilities, this study measured the work ability of 420 Hong Kong construction workers with a Work Ability Index (WAI) which can be used to predict present and future work performance. Given the importance of WAI, in this study the effects of individual and work-related factors on WAI were examined to develop and validate a WAI model to predict how individual and work-related factors affect work ability. The findings will be useful for formulating a pragmatic intervention program to improve the work ability of construction workers and keep them in the work force.

  4. The Work Ability of Hong Kong Construction Workers in Relation to Individual and Work-Related Factors

    Science.gov (United States)

    Ng, Jacky Y. K.

    2018-01-01

    The shortage in Hong Kong of construction workers is expected to worsen in future due to the aging population and increasing construction activity. Construction work is dangerous and to help reduce the premature loss of construction workers due to work-related disabilities, this study measured the work ability of 420 Hong Kong construction workers with a Work Ability Index (WAI) which can be used to predict present and future work performance. Given the importance of WAI, in this study the effects of individual and work-related factors on WAI were examined to develop and validate a WAI model to predict how individual and work-related factors affect work ability. The findings will be useful for formulating a pragmatic intervention program to improve the work ability of construction workers and keep them in the work force. PMID:29758018

  5. Construction work management for nuclear power stations

    International Nuclear Information System (INIS)

    Yoshikawa, Yuichiro

    1982-01-01

    Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)

  6. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Pwer Station

    International Nuclear Information System (INIS)

    Ueyama, Koreyasu

    1982-01-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported. (Wakatsuki, Y.)

  7. Site preparation and excavation works for the foundation of station main building among construction works for No. 1 unit in Kashiwazaki-Kariwa Nuclear Power Station

    Energy Technology Data Exchange (ETDEWEB)

    Ueyama, Koreyasu [Tokyo Electric Power Co., Inc. (Japan)

    1982-09-01

    Tokyo Electric Power Co., Inc., is planning the nuclear power station of final capacity 8,000 MW (7 units) in the region spread over Kashiwazaki City and Kariwa Village in Niigata Prefecture. For No. 1 unit (1100 MWe BWR), the reactor installation license was obtained in September, 1977, the site preparation and road construction started in April, 1978, and harbour construction works started in August, 1979. The construction works are now at the peak, and the overall progressing rate as of the end of June, 1982, is about 51 %. The site is a hilly region of dune along the coast of the Sea of Japan, and No. 1 unit is located in the southern part of the site. This paper reports on the outline of the project, site preparation and excavation works for the foundation of the station main building. For the site preparation and the excavation works for the foundation the main building, the shape of slope cutting, the design of landslide-preventing wall for the vertical excavation for the reactor complex building, and the construction plan and the result are reported. For underground water impermeable wall works, its outline, groundwater condition, groundwater simulation analysis, the investigation of wall installation, the wall structure and construction are described in detail. Also the outline of the control of slope face measurement, the control standards and the measured results are reported.

  8. Construction work

    CERN Multimedia

    2004-01-01

    Construction work on building 179 will start on the 16th February 2004 and continue until November 2004. The road between buildings 179 and 158 will temporarily become a one way street from Route Democrite towards building 7. The parking places between buildings 179 and 7 will become obsolete. The ISOLDE collaboration would like to apologize for any inconveniences.

  9. DEVELOPMENT OF CONTROL SYSTEM FOR PROGRESS OF CONSTRUCTION AND INSTALLATION WORKS BASED ON INTEGRATED APPLICATION OF Primavera P6 Professional R8.3.2 AND ArchiCAD 17.0.0 SOFTWARE PRODUCTS

    Directory of Open Access Journals (Sweden)

    V. P. Grakhov

    2017-01-01

    Full Text Available The paper considers application and development of information technologies while carrying out project management in construction. Organizational and technological support of works throughout its life cycle exerts an influence on quality and efficiency of successful implementation of the construction project. In order to achieve the project goal it is necessary perfectly to organize and plan works, distribute roles and responsibilities of the project participants, regulate composition and content of the project documentation. While analyzing technical and economic indices of construction organization activity and management systems operating in these organizations, conclusion has been made that market experience in functioning of operational management systems has not been adequately applied in practice of domestic construction organizations. Thus, introduction of integrated management systems for quality, costs, time parameters pertaining to project construction, their resource support will contribute to improvement of economic situation of construction organizations. The solution consists in application of up-to-date information technologies, maximum implementation of computer systems and programs in the sphere of production, creation of application software. It has been shown that it is necessary to develop a software model that provides a possibility comprehensively to apply information technology tools for monitoring progress of construction and installation works, systematization of information technology application that allow to control key parameters of construction and installation works, improvement of system for providing actual information in project implementation process. An example of complex application of software products Primavera P6 Professional R8.3.2 and ArchiCAD 17.0.0 is given in the paper.

  10. Second Work in Progress Special Edition

    NARCIS (Netherlands)

    Bottequin, Ezra; Deutz, Marike; Ruggeri, Kai

    2014-01-01

    It is with great pleasure that the Journal of European Psychology Students presents its first special edition of the Work in Progress reports of the Junior Researcher Programme, resulting from a recently established partnership between these two services of the European Federation of Psychology

  11. Fatal accidents in nighttime vs. daytime highway construction work zones.

    Science.gov (United States)

    Arditi, David; Lee, Dong-Eun; Polat, Gul

    2007-01-01

    Awareness about worker safety in nighttime construction has been a major concern because it is believed that nighttime construction creates hazardous work conditions. However, only a few studies provide valuable comparative information about accident characteristics of nighttime and daytime highway construction activities. This study investigates fatal accidents that occurred in Illinois highway work zones in the period 1996-2001 in order to determine the safety differences between nighttime and daytime highway construction. The lighting and weather conditions were included into the study as control parameters to see their effects on the frequency of fatal accidents occurring in work zones. According to this study, there is evidence that nighttime construction is more hazardous than daytime construction. The inclusion of a weather parameter into the analysis has limited effect on this finding. The study justifies establishing an efficient work zone accident reporting system and taking all necessary measures to enhance safety in nighttime work zones.

  12. Empirical Refinements of a Molecular Genetics Learning Progression: The Molecular Constructs

    Science.gov (United States)

    Todd, Amber; Kenyon, Lisa

    2016-01-01

    This article describes revisions to four of the eight constructs of the Duncan molecular genetics learning progression [Duncan, Rogat, & Yarden, (2009)]. As learning progressions remain hypothetical models until validated by multiple rounds of empirical studies, these revisions are an important step toward validating the progression. Our…

  13. Constructions of Work among Adolescents in Transition

    Science.gov (United States)

    Ferrari, Lea; Nota, Laura; Soresi, Salvatore; Blustein, David L.; Murphy, Kerri A.; Kenna, Alexandra C.

    2009-01-01

    To analyze the conception of work and its relationship with the various indices of progress in career development, we administered a structured, open-ended questionnaire that explored beliefs about working among a sample of Italian high school students considering university options. Using both quantitative and qualitative methods, we found that…

  14. Conjoint utility analysis of technical maturity and project progress of construction project

    Directory of Open Access Journals (Sweden)

    Ma Wei

    2016-01-01

    Full Text Available In this paper, taking construction project as the research object, the relationship between the project maturity index calculated by the construction project technical risks with different fine degree and the project progress index is studied, and the equilibrium relationship between the Party A’s utility curve and the Party B’s cost curve of using project maturity index and project progress index as the research variables is analyzed. The results show that, when the construction project technical risk division is more precise, the conjoint utility of the project's technical maturity index and the project progress is higher, and the project’s Party A and Party B two sides are closer to the optimal equilibrium. This shows that the construction project technical risk must be finely divided, and managed and controlled respectively, which will help to improve the conjoint utility of the project Party A and Party B two sides.

  15. The influence factors of the construction progress for the CEFR

    International Nuclear Information System (INIS)

    Li He

    2011-01-01

    This paper describes how to properly coordinate the handling of various problems in the construction of CEFR, so that the owners could effectively shoulder their responsibilities in conclusion of various contradictions. Through eight relations, it suggests its own management concept centering around the construction progress to dialectically seek substantial methods to settle various complex problems. (author)

  16. Ergonomic measures in construction work: enhancing evidence-based implementation

    NARCIS (Netherlands)

    Visser, S.

    2015-01-01

    Despite the development and availability of ergonomic measures in the construction industry, the number of construction workers reporting high physical work demands remains high. A reduction of the high physical work demands can be achieved by using ergonomic measures. However, these ergonomic

  17. CONSTRUCTING SERVICE DISCOURSES IN LITHUANIAN FAMILY SOCIAL WORK

    Directory of Open Access Journals (Sweden)

    Roberta Motiečienė

    2016-09-01

    Full Text Available In this paper, family social work is constructed through the analysis of social service discourses from the social workers’ perspective. Recent research shows how social workers are dealing with complex and fluid issues, as well as the societal uncertainty in their work with families (e.g., Spratt, 2009; Menéndez et al., 2015. Based on earlier studies, it is vital to analyse family social work in different contextual settings. Societal, political and organisational contexts affect the preconditions of social work, but social work also needs to operate within structures (e.g., Pohjola et al., 2014. This paper provides insights into the Lithuanian family social work. The focus is on what kinds of features construct Socialinis darbas su šeima Roberta Motiečienė, Merja Laitinen 12 family social work by analysing social workers’ discourses. This analysis continues the research of Eidukevičiūtė (2013, who analysed family social work practices in transitional Lithuanian society. This researcher aimed to deepen the knowledge about child protection services in Lithuania, the father’s role in child care and the mother’s performance in it. According to Eidukevičiūtė (2013, social workers are still struggling in the field of family social work. This study continues the research tradition in the field of family social work, paying attention to the different contextual settings where family social work is conducted. The Lithuanian government has stated that family policy is a key component of its mandate where (Social Report, 2014. The Council of Social Work plays a very important role in providing guidance on how to implement the government’s policy in the field of family social work. The European Commission Council (2015 provides recommendations for the implementation of the 2015 National Reform Programme, which should concentrate on the people (30% of the total population who are at risk of poverty. The council recommends working on

  18. Risk assessment of work at height in construction

    Directory of Open Access Journals (Sweden)

    Letice Dalla Lana

    2014-02-01

    Full Text Available The construction presents alarming statistics when it comes to the risks that these workers are subject. Higher risks still present work at a height where the fall is the biggest causal factor of fatal accidents. Thus the managements of companies who seek to reduce these risks and this has going for technical evaluation of operational risks. Three of these techniques are discussed in this article: PHA, FTA and CIT. The goal is to determine which one is most effective in assessing the risks of working at height in construction. The methodology used was case study of three works on three different construction of Santa Maria, RS. For a better understanding of the phenomenon suggests that the techniques are used together, but the CIT has provided a better quantitative analysis of incidents and the PHA contributes towards already establish the possible effects that each risk may have.

  19. Evidence of Construct Validity for Work Values

    Science.gov (United States)

    Leuty, Melanie E.; Hansen, Jo-Ida C.

    2011-01-01

    Despite the importance of work values in the process of career adjustment (Dawis, 2002), little empirical research has focused on articulating the domains represented within the construct of work values and the examination of evidence of validity for the construct has been limited. Furthermore, the larger number of work values measures has made it…

  20. Managing Motherhood in the Australian Construction Industry: Work-family Balance, Parental Leave and Part-time Work

    Directory of Open Access Journals (Sweden)

    Helen Lingard

    2012-11-01

    Full Text Available A survey of women in the Australian construction industrywas undertaken to examine women's work experiencesin construction. Questionnaires were distributed to threehundred women in construction occupations and 109completed and usable questionnaires were returned.Women were found to be seriously under-represented insite-based roles. Site/project engineers worked longer hoursthan other occupational groups and expressed significantlygreater work-family conflict. Lack of flexibility and theinability to balance work and family were common themesin the qualitative comments made by many respondents.Even when women indicated that part time work options andmaternity entitlements were provided by their organizations,many expressed a reluctance to use them and perceivedcareer penalty associated with this usage. It is concludedthat more flexible work schedules and the implementationof family-friendly policies may encourage more women intosite-based roles in construction. The paper concludes thatthe rigid work practices presently in place act as a subtleform of discrimination. The provision of such policies willonly be effective if cultural and attitudinal change is alsoachieved.

  1. Fifteen Fine Years of School Construction Progress, 1950-1965.

    Science.gov (United States)

    Milwaukee Public Schools, WI.

    A progress report reviews the Milwaukee School Board's continuous program of acquiring sites and building schools. An itemized listing of 140 completed construction projects is supplemented with pertinent facts and figures, including--(1) growth factors affecting school building needs, (2) resultant increases in the physical plant, staff and…

  2. Management of waste from packaging of construction materials in building construction works

    OpenAIRE

    González Pericot, Natalia; Río Merino, Mercedes del

    2011-01-01

    Every material arriving at the construction site comes protected in some type of packaging, fundamentally cardboard, plastic or wood, and presently the great majority of these packagings finish in a container mixed with the rest of waste of the construction work. The increasing tendency to use prefabricated materials increases the volume of packaging necessary in product transport; in addition, the traditional materials also arrive more protected with packaging. A specific management for ...

  3. Building Construction Progress Monitoring Using Unmanned Aerial System (uas), Low-Cost Photogrammetry, and Geographic Information System (gis)

    Science.gov (United States)

    Bognot, J. R.; Candido, C. G.; Blanco, A. C.; Montelibano, J. R. Y.

    2018-05-01

    Monitoring the progress of building's construction is critical in construction management. However, measuring the building construction's progress are still manual, time consuming, error prone, and impose tedious process of analysis leading to delays, additional costings and effort. The main goal of this research is to develop a methodology for building construction progress monitoring based on 3D as-built model of the building from unmanned aerial system (UAS) images, 4D as-planned model (with construction schedule integrated) and, GIS analysis. Monitoring was done by capturing videos of the building with a camera-equipped UAS. Still images were extracted, filtered, bundle-adjusted, and 3D as-built model was generated using open source photogrammetric software. The as-planned model was generated from digitized CAD drawings using GIS. The 3D as-built model was aligned with the 4D as-planned model of building formed from extrusion of building elements, and integration of the construction's planned schedule. The construction progress is visualized via color-coding the building elements in the 3D model. The developed methodology was conducted and applied from the data obtained from an actual construction site. Accuracy in detecting `built' or `not built' building elements ranges from 82-84 % and precision of 50-72 %. Quantified progress in terms of the number of building elements are 21.31% (November 2016), 26.84 % (January 2017) and 44.19 % (March 2017). The results can be used as an input for progress monitoring performance of construction projects and improving related decision-making process.

  4. [Research progress of co-culture system for constructing vascularized tissue engineered bone].

    Science.gov (United States)

    Fu, Weili; Xiang, Zhou

    2014-02-01

    To review the research progress of the co-culture system for constructing vascularized tissue engineered bone. The recent literature concerning the co-culture system for constructing vascularized tissue engineered bone was reviewed, including the selection of osteogenic and endothelial lineages, the design and surface modification of scaffolds, the models and dimensions of the co-culture system, the mechanism, the culture conditions, and their application progress. The construction of vascularized tissue engineered bone is the prerequisite for their survival and further clinical application in vivo. Mesenchymal stem cells (owning the excellent osteogenic potential) and endothelial progenitor cells (capable of directional differentiation into endothelial cell) are considered as attractive cell types for the co-culture system to construct vascularized tissue engineered bone. The culture conditions need to be further optimized. Furthermore, how to achieve the clinical goals of minimal invasion and autologous transplantation also need to be further studied. The strategy of the co-culture system for constructing vascularized tissue engineered bone would have a very broad prospects for clinical application in future.

  5. Anticipated Work-Family Conflict: A Construct Investigation

    Science.gov (United States)

    Westring, Alyssa Friede; Ryan, Ann Marie

    2011-01-01

    To date, little is known about how work-family issues impact the career development process. In the current paper, we explore this issue by investigating a relatively unstudied construct: anticipated work-family conflict. We found that this construct can be represented by the same six-dimensional factor structure used to assess concurrent…

  6. Learning progressions from a sociocultural perspective: response to "co-constructing cultural landscapes for disciplinary learning in and out of school: the next generation science standards and learning progressions in action"

    Science.gov (United States)

    Tytler, Russell

    2016-10-01

    This article discusses a case for a different, socio-cultural way of looking at learning progressions as treated in the next generation science standards (NGSS) as described by Ralph Cordova and Phyllis Balcerzak's paper "Co-constructing cultural landscapes for disciplinary learning in and out of school: the next generation science standards and learning progressions in action". The paper is interesting for a number of reasons, and in this response I will identify different aspects of the paper and link the points made to my own research, and that of colleagues, as complementary perspectives. First, the way that the science curriculum is conceived as an expanding experience that moves from the classroom into the community, across subjects, and across time, links to theoretical positions on disciplinary literacies and notions of learning as apprenticeship into the discursive tools, or `habits of mind' as the authors put it, that underpin disciplinary practice. Second, the formulation of progression through widening communities of practice is a strong feature of the paper, and shows how children take on the role of scientists through this expanding exposure. I will link this approach to some of our own work with school—community science partnerships, drawing on the construct of boundary crossing to tease out relations between school science and professional practice. Third, the demonstration of the expansion of the children's view of what scientists do is well documented in the paper, illustrated by Figure 13 for instance. However I will, in this response, try to draw out and respond to what the paper is saying about the nature of progression; what the progression consists of, over what temporal or spatial dimensions it progresses, and how it can productively frame curriculum processes.

  7. Civil works for NPPs construction

    International Nuclear Information System (INIS)

    Portenseigne, Christophe

    2014-01-01

    Christophe Portenseigne, Technical Director of Bouygues Travaux Publics, provided explanations on the main challenges of Civil work for the construction of the 3. generation of NPPs. He then provided an overview of the new Civil Work concepts for the 4. generation of NPPs

  8. Progressive Taxation, Wage Bargaining, and Endogenous Working Time

    DEFF Research Database (Denmark)

    Kreiner, Claus Thustrup

    This paper analyses the impact of tax reforms that decrease income tax progression in an equilibrium search model with wage bargaining and endogenous individual working time. The working time is either bargained together with the hourly wage (case 1) or determined solely by workers after bargaining...... over the wage (case 2). In both cases reducing tax progression increases working time of employed and, more interestingly, increases unambiguously wages and unemployment. Wages and unemployment rise more and working time and production less in case 1 compared to case 2; probably making case 2 countries...... best suited for such tax reforms...

  9. Civil Engineering Construction of Underground Works

    CERN Document Server

    Rammer, H

    1999-01-01

    For the first time at CERN, new shafts and caverns will be excavated inside a surface building. The LHC civil engineering construction for the ATLAS experiment has been designed such that the experimental hall will be completed to the extent that it can provide a secure, weatherproof and sound insulated covering to the shaft excavation area. The construction of the two access shafts and the experimental cavern will follow and will be carried out inside the building. This unconventional method of working allows the excavation of the Molasse rock in the dry, which is essential for this type of rock, and ensures reduced environmental pollution by noise and dust. The paper will present the technical infrastructure required for this particular construction method, explain its advantages and disadvantages, and compare it with a conventional method of underground excavations to be used on the same work site for the construction of the service cavern.

  10. Servant leadership and work-related well-being in a construction company

    Directory of Open Access Journals (Sweden)

    Michiel F. Coetzer

    2017-11-01

    Full Text Available Orientation: High levels of work-related well-being are imperative to ensure financial stability, competitiveness and sustainability in the construction industry. Leadership plays a fundamental role to enhance work engagement and to decrease burnout. The interrelationships between servant leadership, job demands, job resources, work engagement and burnout are still unknown, especially within the construction industry. Research purpose: The aim of this study was to explore the interrelationships between servant leadership, job demands, job resources, work engagement and burnout in a construction company. Motivation for the study: The construction industry is a highly demanding and labour intensive industry, which makes it difficult to sustain high work engagement and low burnout. This industry therefore calls for a people-orientated leadership approach, such as servant leadership, to enhance job resources to ultimately increase work engagement and to decrease burnout levels. Research design, approach and method: A quantitative research design was applied and four quantitative surveys were used to collect data. Two hundred and twenty-four sets of questionnaires were completed by employees in a South African construction company. Main findings: The results indicated that job resources mediated a positive relationship between servant leadership and work engagement and a negative relationship between servant leadership and burnout. Servant leadership had a positive significant relationship with job resources and significantly explained a proportion of the variance in job resources. Job resources, in turn, significantly explained a proportion of increase in work engagement levels and a proportion of reduction in burnout levels. An insignificant relationship was found between job demands and servant leadership. Practical or managerial implications: The findings showed that servant leadership could be used as an effective leadership approach to enhance

  11. Anatomy of Alternating Quantifier Satisfiability (Work in progress)

    DEFF Research Database (Denmark)

    Dung, Phan Anh; Bjørner, Nikolaj; Monniaux, David

    We report on work in progress to generalize an algorithm recently introduced in [10] for checking satisfiability of formulas with quantifier alternation. The algorithm uses two auxiliary procedures: a procedure for producing a candidate formula for quantifier elimination and a procedure for elimi...

  12. Improvements in the construction of nuclear power plant

    International Nuclear Information System (INIS)

    1990-01-01

    This paper outlines activities to minimize the amount of work at a construction site by employing installation method with large size blocks and shop-assembled units, improvement in facilities such as mechanization of welding and huge roof cover which enables work in all weather conditions, and administration systems using computer for the work activity control as well as quality and progress control for construction work. These improvements are only achieved when supported by related system improvements at the design and fabrication stage, and these improvements contributed a great deal to the quality assurance and the shorter construction period. (author)

  13. Budget performance reporting and construction work packaging

    International Nuclear Information System (INIS)

    Strong, M.G.; Weyers, L.L.

    1976-01-01

    A changing financial, technological, and regulatory environment has increased the complexity, costliness, and risk involved in constructing new generating facilities. A primary challenge facing utility executives is to hold down costs on these construction projects. New construction management techniques are required to accomplish this. Commonwealth Edison has responded by implementing a new Budget Performance Reporting System and a Construction Work Packaging System. The new systems are being used successfully on four major construction projects with budgets totaling over $4 billion

  14. Work in progress Work in progress

    Directory of Open Access Journals (Sweden)

    Anita Runge

    2000-07-01

    Full Text Available Der Band versammelt thematisch und methodisch heterogene Beiträge aus der Geschichts-, Sprach- und Literaturwissenschaft. Gemeinsamer Bezugspunkt ist ein diskursanalytisch aufgefaßter gender-Begriff. Den aktuellen Stand der Diskussion reflektieren zwei Beiträge, die die Campus-(Kriminal-Romane von Amanda Cross und Antonia S. Byatt als ‚Meta-Texte‘ feministischer Theoriebildung interpretieren.This collection contains thematically and methodically heterogeneous articles from history, linguistics, and literary studies. Their common point of reference is a discours analytical approach to gender studies. The current discussion is reflected by two articles, that interpret the campus novels/thrillers by Amanda Cross and Antonia S. Byatt as being ‘meta texts’ of feminist theory construction.

  15. CONSTRUCTING SERVICE DISCOURSES IN LITHUANIAN FAMILY SOCIAL WORK

    OpenAIRE

    Roberta Motiečienė; Merja Laitinen

    2016-01-01

    In this paper, family social work is constructed through the analysis of social service discourses from the social workers’ perspective. Recent research shows how social workers are dealing with complex and fluid issues, as well as the societal uncertainty in their work with families (e.g., Spratt, 2009; Menéndez et al., 2015). Based on earlier studies, it is vital to analyse family social work in different contextual settings. Societal, political and organisational contexts affect the pre...

  16. New experience on construction and installation work in Qinshan PHWR nuclear power plant

    International Nuclear Information System (INIS)

    Lu Huaxiang

    2004-01-01

    The article provides a summary of the new experience on construction management and construction technology in the field of civil construction and installation work in Qinshan PHWR nuclear power plant, with focus on innovation in project management mode, new technology application and computerized management of construction and installation work. Management innovation, technical innovation and information technology are the key contributors to overall success of Qinshan PHWR nuclear power plant in construction and installation work. The new experience derived in these fields will be of great significance to promote independent construction of the new-round nuclear power projects in China. (author)

  17. Financial management of the construction company

    Directory of Open Access Journals (Sweden)

    Antosova, Karolina

    2016-12-01

    Full Text Available This paper informs about the financial management in the construction company. The work describes problems of the management, its tasks, goals, dependencies on the size of the construction company and progress in the construction production and also introduce topic of the risks in the construction business. Also controlling and reporting in the construction company together with basic tools are described in example of Metrostav a.s. in this work.

  18. Construction work for prototype fast breeder reactor MONJU

    International Nuclear Information System (INIS)

    Suzuki, Yasuyuki; Tsuji, Koichi; Shimizu, Hisashi

    1991-01-01

    The main construction work of MONJU was started from the excavation for building foundation in October 1985, the containment vessel was prepared in April 1987, the reactor vessel was installed in October 1988, and the installation of the whole equipment was completed in April 1991. Fuji Electric made preparations for construction matching the above master schedule in consideration of construction schedule quality assurance and safety and accomplished the work within the scheduled time without personal injury as long as 2.35 million hours. (author)

  19. System Dynamics Model and Simulation of Employee Work-Family Conflict in the Construction Industry

    Science.gov (United States)

    Wu, Guangdong; Duan, Kaifeng; Zuo, Jian; Yang, Jianlin; Wen, Shiping

    2016-01-01

    The construction industry is a demanding work environment where employees’ work-family conflict is particularly prominent. This conflict has a significant impact on job and family satisfaction and performance of employees. In order to analyze the dynamic evolution of construction industry employee’s work-family conflict between work and family domains, this paper constructs a bi-directional dynamic model framework of work-family conflict by referring to the relevant literature. Consequently, a system dynamics model of employee’s work-family conflict in the construction industry is established, and a simulation is conducted. The simulation results indicate that construction industry employees experience work interference with family conflict (WIFC) levels which are significantly greater than the family interference with work conflict (FIWC) levels. This study also revealed that improving work flexibility and organizational support can have a positive impact on the satisfaction and performance of construction industry employees from a work and family perspective. Furthermore, improving family support can only significantly improve employee job satisfaction. PMID:27801857

  20. System Dynamics Model and Simulation of Employee Work-Family Conflict in the Construction Industry.

    Science.gov (United States)

    Wu, Guangdong; Duan, Kaifeng; Zuo, Jian; Yang, Jianlin; Wen, Shiping

    2016-10-28

    The construction industry is a demanding work environment where employees' work-family conflict is particularly prominent. This conflict has a significant impact on job and family satisfaction and performance of employees. In order to analyze the dynamic evolution of construction industry employee's work-family conflict between work and family domains, this paper constructs a bi-directional dynamic model framework of work-family conflict by referring to the relevant literature. Consequently, a system dynamics model of employee's work-family conflict in the construction industry is established, and a simulation is conducted. The simulation results indicate that construction industry employees experience work interference with family conflict (WIFC) levels which are significantly greater than the family interference with work conflict (FIWC) levels. This study also revealed that improving work flexibility and organizational support can have a positive impact on the satisfaction and performance of construction industry employees from a work and family perspective. Furthermore, improving family support can only significantly improve employee job satisfaction.

  1. System Dynamics Model and Simulation of Employee Work-Family Conflict in the Construction Industry

    Directory of Open Access Journals (Sweden)

    Guangdong Wu

    2016-10-01

    Full Text Available The construction industry is a demanding work environment where employees’ work-family conflict is particularly prominent. This conflict has a significant impact on job and family satisfaction and performance of employees. In order to analyze the dynamic evolution of construction industry employee’s work-family conflict between work and family domains, this paper constructs a bi-directional dynamic model framework of work-family conflict by referring to the relevant literature. Consequently, a system dynamics model of employee’s work-family conflict in the construction industry is established, and a simulation is conducted. The simulation results indicate that construction industry employees experience work interference with family conflict (WIFC levels which are significantly greater than the family interference with work conflict (FIWC levels. This study also revealed that improving work flexibility and organizational support can have a positive impact on the satisfaction and performance of construction industry employees from a work and family perspective. Furthermore, improving family support can only significantly improve employee job satisfaction.

  2. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong.

    Science.gov (United States)

    Yu, Ann T W; Poon, C S; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C&D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C&D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C&D waste. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. How engineering facilitates construction

    International Nuclear Information System (INIS)

    Bailey, D.T.

    1976-01-01

    During a recent survey, construction personnel at jobsites were asked, ''what are the ten most unwanted construction problems.'' One reoccurring answer was design/construction incompatibility. In fact, many designs were impractical from a construction point of view. The reasons for this problem can be identified: Once construction begins, engineering is under intense pressure to issue new drawings to allow work to progress according to schedule. Other reasons may be the relative inexperience of the design personnel in construction, changes in design criteria and delays in receipt of supplier or client information. A description is presented of ways to solve this problem by obtaining construction expertise and input into the various phases and products of the engineering work

  4. 14 CFR 151.45 - Performance of construction work: General requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: General... § 151.45 Performance of construction work: General requirements. (a) All construction work under a... work under a project until— (1) The sponsor has furnished three conformed copies of the contract to the...

  5. The Case for Family-Friendly Work Practices in the Australian Construction Industry

    Directory of Open Access Journals (Sweden)

    Valerie Francis

    2012-11-01

    Full Text Available Although significant changes at the social, demographic, technological and workforce levelshave transformed the relationship between family and work, these changes have notbeen reflected in the employment practices of many construction companies. Many of thejob and organisational factors found to be negatively associated with family functioning arepertinent to construction professionals. Staff are expected to work long hours in demandingroles and this, combined with job insecurity and frequent relocation, means that familylife and individual well-being can be compromised. A growing body of research has foundthat the implementation of family-friendly work policies and practices can lead to greaterproductivity, lower attrition rates and higher morale in the workplace. In addition providinga work environment that is supportive of workers' family roles can help to alleviate workrelatedmental health problems.This paper outlines the changing demographic trends and societal attitudes that are makingindividuals and organisations question current work cultures and structures. Optionsfor making the construction industry a more family-friendly work environment are considered.All professionals, regardless of their age, gender and family responsibilities, canbenefit from these initiatives. The paper concludes by discussing the implications of theseissues for construction companies and future research work.

  6. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    International Nuclear Information System (INIS)

    Yu, Ann T.W.; Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Highlights: ► A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. ► However, the reduction cannot be sustained. ► Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006–2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  7. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk [Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong); Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara [Department of Civil and Structural Engineering, Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong)

    2013-01-15

    Highlights: Black-Right-Pointing-Pointer A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. Black-Right-Pointing-Pointer However, the reduction cannot be sustained. Black-Right-Pointing-Pointer Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  8. Progressive building methods in nuclear power plant construction

    International Nuclear Information System (INIS)

    Sikura, V.

    1980-01-01

    A detailed description is given of the new prospective technologies used in the construction of the Bohunice V-1 nuclear power plant. They include the use of steel and large-area forms, the use of profile sheets as a substitute for forms, assembled raw partitions, wall shells consisting of clamped porous concrete slabs, assembled roof shells, special finish of concrete walls, bearing wall deep foundation, the use of modern building machinery for concreting, reinforcing and welding works. (M.S.)

  9. WIPP: construction and progress on a successful nuclear waste repository

    International Nuclear Information System (INIS)

    Cooper, W.R.; Sankey, C.A.

    1985-01-01

    The Department of Energy is constructing the Waste Isolation Pilot Plant (WIPP) in Southeastern New Mexico. The facility will retrievably store transuranic waste from defense activities of the United States and conduct experiments with Defense high-level waste which will be retrieved at the end of the experiments. This paper describes the progress and the present status of activities at WIPP. 4 refs

  10. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  11. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  12. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    Science.gov (United States)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  13. Habit formation, work ethics, and technological progress

    OpenAIRE

    Faria, João Ricardo; León-Ledesma, Miguel A.

    2002-01-01

    Work ethics affects labor supply. This idea is modeled assuming that work is habit forming. This paper introduces working habits in a neoclassical growth model and compares its outcomes with a model without habit formation. In addition, it analyzes the impact of different forms of technical progress. The findings are that i) labor supply in the habit formation case is higher than in the neoclassical case; ii) unlike in the neoclassical case, labor supply in the presence of habit formation wil...

  14. Construction of LDPC codes over GF(q) with modified progressive edge growth

    Institute of Scientific and Technical Information of China (English)

    CHEN Xin; MEN Ai-dong; YANG Bo; QUAN Zi-yi

    2009-01-01

    A parity check matrix construction method for constructing a low-density parity-check (LDPC) codes over GF(q) (q>2) based on the modified progressive edge growth (PEG) algorithm is introduced. First, the nonzero locations of the parity check matrix are selected using the PEG algorithm. Then the nonzero elements are defined by avoiding the definition of subcode. A proof is given to show the good minimum distance property of constructed GF(q)-LDPC codes. Simulations are also presented to illustrate the good error performance of the designed codes.

  15. 14 CFR 151.49 - Performance of construction work: Contract requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Contract... § 151.49 Performance of construction work: Contract requirements. (a) Contract provisions. In addition to any other provisions necessary to ensure completion of the work in accordance with the grant...

  16. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Science.gov (United States)

    2010-01-01

    ... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  17. Transparency in the Assessment of Takaful Claims for Construction Works Loss & Damage

    OpenAIRE

    Puteri Nur Farah Naadia Mohd Fauzi; Khairuddin Abdul Rashid

    2016-01-01

    In the context of the construction industry, an alternative to the conventional insurance for works contracts is the Shariah compliant insurance otherwise known as takaful. Among the most frequently used takaful for construction works contracts is the Contractor’s All Risks (CAR) Takaful. However, the future of CAR Takaful may be affected should issues such as marketing and clarification on how it works including how claims are processed, valued and compensation ...

  18. Works of shifting discharge facilities in construction for adding No.3 and No.4 plants to Oi Nuclear Power Station

    International Nuclear Information System (INIS)

    Matsuoka, Gen-ichi; Yoshida, Atsumu.

    1989-01-01

    At present in Oi Power Station, No.1 and No.2 plants of 1175 MWe output each are in operation, but in order to stabilize electric power supply for a long period, Kansai Electric Power Co., Inc. earnestly advances the construction works for adding No.3 and No.4 plants of each 1180 MWe output PWR. No.3 plant is expected to begin the operation in October, 1991, and No.4 plant in August, 1992. The works for creating the site were started in July, 1985, and the flat land of about 60,000 m 2 and the reclaimed land of about 80,000 m 2 were prepared. Subsequently, the main construction works were started in May, 1987, and the rate of general progress was 21 % in No.3 plant and 2 % in No.4 plant as of the end of October, 1988. Due to the addition of No.3 and No.4 plants, the quantity of condenser cooling water discharge increases to 318 m 3 /s from 150 m 3 /s at present, therefore, the bank having discharge holes is shifted from the present position about 100 m toward sea. As to the problems, the shifting works in flowing water, the method of shifting, the examination on lifting caissons and culverts, the trial construction of chemical anchors and so on were investigated. The execution of the shifting works is reported. (K.I.)

  19. Progress report on fast breeder reactor development in Japan, October - December 1976

    International Nuclear Information System (INIS)

    1977-03-01

    As for the fast breeder experimental reactor ''Joyo'', the remodeling works for the bearings of primary main circulation pump and the support bands of hanger support have finished. Preparatory arrangement was made for the second performance test, such as preheating the primary cooling system and filling sodium in it. Construction, installation and adjustment of test and inspection apparatuses required after the criticality experiment are in progress. The lining work for the temporary storage pool for solid wastes, the enlarging work for the operation control building, and construction of the brake equipment for cooler blower were over. As for the operation control, operation, inspection and maintenance of each system required for the modeling work are being carried out, and new parts to take the place of old ones were provided. The analysis of the core characteristics and the development of operation-monitoring codes are in progress. The coordination design work (4) for the fast breeder prototype reactor ''Monju'' has been started, and the preliminary design work (2) for the demonstration reactor is going on. Geological, meteorological and seismic researches carried out at the proposed construction site for ''Monju''. The researches and developments on reactor physics, structural components, instrumentation and control, sodium technology, fuel materials, safety and steam generators are in progress. (Kako, I.)

  20. 26 CFR 1.46-5 - Qualified progress expenditures.

    Science.gov (United States)

    2010-04-01

    ... in the case of self-constructed property) for construction of progress expenditure property. The... time when physical work on construction commences is based on the facts and circumstances of each case.... Taxpayers should refer to normal industry practice in estimating the normal construction period of...

  1. Construct validity of the Individual Work Performance Questionnaire.

    NARCIS (Netherlands)

    Koopmans, L.; Bernaards, C.M.; Hildebrandt, V.H.; Vet, H.C.W. de; Beek, A.J. van der

    2014-01-01

    Objective: To examine the construct validity of the Individual Work Performance Questionnaire (IWPQ). Methods: A total of 1424 Dutch workers from three occupational sectors (blue, pink, and white collar) participated in the study. First, IWPQ scores were correlated with related constructs

  2. Construct validity of the individual work performance questionnaire

    NARCIS (Netherlands)

    Koopmans, L.; Bernaards, C.M.; Hildebrandt, V.H.; Vet, H.C.W. de; Beek, A.J. van der

    2014-01-01

    OBJECTIVE:: To examine the construct validity of the Individual Work Performance Questionnaire (IWPQ). METHODS:: A total of 1424 Dutch workers from three occupational sectors (blue, pink, and white collar) participated in the study. First, IWPQ scores were correlated with related constructs

  3. Work Stress among Professionals in Building Construction Industry in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2011-09-01

    Full Text Available This study was undertaken to identify key stress factors among professionals in building construction industry in Nigeria. This is in view of the fact that to date, very little is known about work stress among professionals in building construction industry in this country. The study involved the administration of questionnaire to 107 professionals including architects, builders, civil/structural engineers and quantity surveyors randomly selected from 60 ongoing building projects in Anambra, Ogun and Kaduna States, Nigeria. The data was analysed using descriptive statistics, and findings show that the principal sources of stress were high volume of work, uncomfortable site office environment, lack of feedback on previous and ongoing building projects, and variations in the scope of work in ongoing building projects. The paper suggests that taking responsibility for work which one has adequate capacity to handle, establishing realistic budgets and time frame for project delivery, provision of spatially adequate, visually and thermally comfortable site offices, adoption of appropriate job design practice and education of professionals on stress management strategies will reduce the incidence of stress among professionals in building industry in Nigeria.

  4. Work Stress among Professionals in Building Construction Industry in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2011-09-01

    Full Text Available This study was undertaken to identify key stress factors among professionals in building construction industry in Nigeria. This is in view of the fact that to date, very little is known about work stress among professionals in building construction industry in this country. The study involved the administration of questionnaire to 107 professionals including architects, builders, civil/structural engineers and quantity surveyors randomly selected from 60 ongoing building projects in Anambra, Ogun and Kaduna States, Nigeria. The data was analysed using descriptive statistics, and findings show that the principal sources of stress were high volume of work, uncomfortable site office environment, lack of feedback on previous and ongoing building projects, and variations in the scope of work in ongoing building projects. The paper suggests that taking responsibility for work which one has adequate capacity to handle, establishing realistic budgets and time frame for project delivery, provision of spatially adequate, visually and thermally comfortable site offices, adoption of appropriate job design practice and education of professionals on stress management strategies will reduce the incidence of stress among professionals in building industry in Nigeria. 

  5. Traffic incident management in construction and maintenance work zones.

    Science.gov (United States)

    2009-01-01

    In 2004, the Federal Highway Administration published updated rules governing work zone safety and mobility; all highway construction and maintenance projects using federal-aid highway funds are required to develop transportation management plans (TM...

  6. The repetition effect in building and construction works

    DEFF Research Database (Denmark)

    Gottlieb, Stefan Christoffer; Haugbølle, Kim

    are then applied on the Public Transport Authorities' main account structure of units and costs, and a method for assessing the possibilities of achieving effects of repetition for each account is described. Finally, the report summarises the core conditions necessary to take into consideration in relation......This report summarises the results from the work undertaken for the Public Transport Authority on the effect of learning and repetition in building and construction works. The results are applied by the Public Transport Authority in a new budgeting model, while the agency investigates...

  7. 14 CFR 151.53 - Performance of construction work: Labor requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Labor... § 151.53 Performance of construction work: Labor requirements. A sponsor who is required to include in a... during the performance of work under the contract, to the extent necessary to determine whether the...

  8. Survey dataset on work-life conflict of women in the construction industry.

    Science.gov (United States)

    Tunji-Olayeni, Patience F; Afolabi, Adedeji O; Adewale, Bukola A; Fagbenle, Ayoola O

    2018-08-01

    Work-life conflict can have a detrimental effect on family life, particularly for women who have to work in order to support their families financially. The data set presents the views of 50 female construction professionals in Lagos, Nigeria through a purposive sampling technique with the aid of questionnaire. Categorical Regression was used to assess the effect of work pressure on family expectations. The features of the respondents in terms of profession, years of experience, office location and household characteristics were presented in bar chart. Analysis of the data can provide information on the work experiences of women in the construction industry particularly work load, hours worked per day, work on weekends and work on holidays. The data can also provide insights on the family expectations that are significantly affected by work pressure.

  9. Methodology for quantification of waste generated in Spanish railway construction works

    International Nuclear Information System (INIS)

    Guzmán Báez, Ana de; Villoria Sáez, Paola; Río Merino, Mercedes del; García Navarro, Justo

    2012-01-01

    Highlights: ► Two equations for C and D waste estimation in railway construction works are developed. ► Mixed C and D waste is the most generated category during railway construction works. ► Tunnel construction is essential to quantify the waste generated during the works. ► There is a relationship between C and D waste generated and railway functional units. ► The methodology proposed can be used to obtain new constants for other areas. - Abstract: In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C and D) waste. Specifically, in 2006, Spain generated roughly 47 million tons of C and D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C and D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C and D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects. Therefore, the aim of this research study is to improve C and D waste management in railway projects, by developing a model for C and D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C and D waste likely to be generated in railway construction projects, including the category of C and D waste generated for the entire project.

  10. Technical skills requirement of Indonesian construction labors to work in Malaysia

    Science.gov (United States)

    Adi, Henny Pratiwi

    2017-03-01

    Labors skills is an important part of construction projects implementation. Suitability between the skills possessed by labors with the skills needed by user is required to increase employment opportunities. Malaysia is a country that using construction labors from Indonesia. This study aims to get the kind of technical skills required by users of Indonesian constructian labors in Malaysia and also the importance level of technical skills. Data collecting in this research was conducted through interviews and questionnaires on contractors in Malaysia. The next stage was determine the importance level of technical skills in work field of carpenter, bricklayer, plumber and painters. The importance level of technical skills analyzed using the Relative Importance Index (RII). The results showed that mastering the operation of both instruments either manually or electrically is the most importance in the technical skills. Therefore, an understanding of the types of equipment for work field and the manner of operation is need to had by Indonesian construction labors who will work in Malaysia.

  11. Progress on nuclear data work at Nankai University in 1995

    Energy Technology Data Exchange (ETDEWEB)

    Chonghai, Cai; Ziqiang, Yu; Yixin, Zuo [Nankai Univ., Tianjin (China)

    1996-06-01

    The research work on nuclear model programs and QMD theory are reported. Two nuclear models programs CCRMN and OMHF have finished in 1995. The theoretical research on quantum molecular dynamics (QMD) have made significant progress in 1995.

  12. Constructing health and sickness in the context of motherhood and paid work.

    Science.gov (United States)

    Cunningham-Burley, Sarah; Backett-Milburn, Kathryn; Kemmer, Debbie

    2006-05-01

    Changes in the labour market, especially the rise in the employment of women (lone or partnered) with children, alongside an increased policy emphasis on work as a component of active citizenship for men and women, have stimulated the development of research examining the balance between work and home. Although sociologists have long been interested in the interface between the spheres of paid work and domestic life, understandings of the subjective experience of health and illness have tended to keep the domains of family and work separate. This paper addresses the construction of health and illness as operating at the interface between the worlds of work and home. Interviews were conducted with 30 mothers in paid work and having primary school aged children; the study was located in Edinburgh, Scotland. Through an analysis of the interview accounts, this paper examines respondents' experiences and constructions of health, sickness and wellbeing in themselves and in their children. Four areas are discussed: respondents' accounts of the effects of caring and providing on their own health; respondents' accounts of the influence of workplace relationships in the construction of sickness; respondents' accounts of negotiating absence for their children's sickness and how they made sense of and defined child sickness. We argue that managing sickness, itself an anticipated but unpredictable event, gives analytical purchase to understanding the values and practices that characterise the interrelationship between work and family life. The intersections of home and work operate powerfully in respondents' constructions of health and sickness, and the analysis demonstrates how these are played out in everyday life, at home and at work.

  13. Computer support for collaborative work in the construction industry

    NARCIS (Netherlands)

    Leeuwen, van J.P.; Cha, J.

    2003-01-01

    Collaborative work is an essential ingredient for success in the construction industry. With the advancements of capabilities of information technologies and communication infrastructures, the effective utilisation of these technologies has become very important and strongly affects business

  14. Employee preferences for work-life benefits in a large New Zealand construction company

    Directory of Open Access Journals (Sweden)

    Emily Morrison

    2012-02-01

    Full Text Available The construction industry is a challenging environment in which to work, with job characteristics that are linked to work-life conflict, and it is important for its future sustainability that initiatives to support employee work-life balance are undertaken. 121 head office and site-based employees within a large New Zealand construction company rated their preferences for work-life benefits, and the results were compared with those of a similar previous (Australian study. The most preferred work-life benefit factor (as for the previous Australian study was found to be ‘wellness and personal development’. Results suggest that company provision of a wide variety of work-life benefits from which employees can choose during different stages in their life and career is ideal. Qualitative results suggest some work-life conflict associated with working long hours and weekend work exists. It is proposed that to attract and retain valuable employees, the New Zealand construction industry must provide useful work-life benefits, reasonable working hours, and supportive workplace cultures in line with such initiatives. 

  15. Employee preferences for work-life benefits in a large New Zealand construction company

    Directory of Open Access Journals (Sweden)

    Emily Morrison

    2012-02-01

    Full Text Available The construction industry is a challenging environment in which to work, with job characteristics that are linked to work-life conflict, and it is important for its future sustainability that initiatives to support employee work-life balance are undertaken. 121 head office and site-based employees within a large New Zealand construction company rated their preferences for work-life benefits, and the results were compared with those of a similar previous (Australian study. The most preferred work-life benefit factor (as for the previous Australian study was found to be ‘wellness and personal development’. Results suggest that company provision of a wide variety of work-life benefits from which employees can choose during different stages in their life and career is ideal. Qualitative results suggest some work-life conflict associated with working long hours and weekend work exists. It is proposed that to attract and retain valuable employees, the New Zealand construction industry must provide useful work-life benefits, reasonable working hours, and supportive workplace cultures in line with such initiatives.

  16. A Body of Work Standard-Setting Method with Construct Maps

    Science.gov (United States)

    Wyse, Adam E.; Bunch, Michael B.; Deville, Craig; Viger, Steven G.

    2014-01-01

    This article describes a novel variation of the Body of Work method that uses construct maps to overcome problems of transparency, rater inconsistency, and scores gaps commonly occurring with the Body of Work method. The Body of Work method with construct maps was implemented to set cut-scores for two separate K-12 assessment programs in a large…

  17. 14 CFR 151.51 - Performance of construction work: Sponsor force account.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Sponsor... Development Projects § 151.51 Performance of construction work: Sponsor force account. (a) Before undertaking any force account construction work, the sponsor (or any public agency acting as agent for the sponsor...

  18. ATLAS construction status

    International Nuclear Information System (INIS)

    Jenni, P.

    2006-01-01

    The ATLAS detector is being constructed at the LHC, in view of a data-taking startup in 2007. This report concentrates on the progress and the technical challenges of the detector construction, and summarizes the status of the work as of August 2004. The project is on track to allow the highly motivated ATLAS Collaboration to enter into a new exploratory domain of high-energy physics in 2007. (author)

  19. Enabling Mass Customization in Construction – Making the long tail work

    DEFF Research Database (Denmark)

    Thuesen, Christian; Jensen, Jens Stissing; Gottlieb, Stefan Christoffer

    2013-01-01

    The chapter discusses the development of construction management practices the past 50 years outlining the academic and practical context for the adoption of Mass Customization in Construction. Theoretically, the chapter builds on two fundamental insights: The Pareto principle and the Thomas...... attempts to develop new construction practices like Lean implicitly reproduce this myth. The result is that construction research the past 25 years has been constructing the long tail in a way that hinders radical development of the construction industry. The chapter concludes that if we allow ourselves...... view of buildings – as unique – implies that: 1) the nature of the construction processes is chaotic, 2) the buildings are realized through onsite project work rather than through offsite production; and 3) project management is the fundamental management principle. The chapter further identifies how...

  20. Construction experiences from underground works at Forsmark. Compilation Report

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Anders [Vattenfall Power Consultant AB, Stockholm (Sweden); Christiansson, Rolf [Swedish Nuclear Fuel and Waste Management Co., Stockholm (Sweden)

    2007-02-15

    The main objective with this report, the Construction Experience Compilation Report (CECR), is to compile experiences from the underground works carried out at Forsmark, primarily construction experiences from the tunnelling of the two cooling water tunnels of the Forsmark nuclear power units 1, 2 and 3, and from the underground excavations of the undersea repository for low and intermediate reactor waste, SFR. In addition, a brief account is given of the operational experience of the SFR on primarily rock support solutions. The authors of this report have separately participated throughout the entire construction periods of the Forsmark units and the SFR in the capacity of engineering geologists performing geotechnical mapping of the underground excavations and acted as advisors on tunnel support; Anders Carlsson participated in the construction works of the cooling water tunnels and the open cut excavations for Forsmark 1, 2 and 3 (geotechnical mapping) and the Forsmark 3 tunnel (advise on tunnel support). Rolf Christiansson participated in the underground works for the SFR (geotechnical mapping, principal investigator for various measurements and advise on tunnel support and grouting). The report is to a great extent based on earlier published material as presented in the list of references. But it stands to reason that, during the course of the work with this report, unpublished notes, diaries, drawings, photos and personal recollections of the two authors have been utilised in order to obtain such a complete compilation of the construction experiences as possible.

  1. Construction experiences from underground works at Forsmark. Compilation Report

    International Nuclear Information System (INIS)

    Carlsson, Anders; Christiansson, Rolf

    2007-02-01

    The main objective with this report, the Construction Experience Compilation Report (CECR), is to compile experiences from the underground works carried out at Forsmark, primarily construction experiences from the tunnelling of the two cooling water tunnels of the Forsmark nuclear power units 1, 2 and 3, and from the underground excavations of the undersea repository for low and intermediate reactor waste, SFR. In addition, a brief account is given of the operational experience of the SFR on primarily rock support solutions. The authors of this report have separately participated throughout the entire construction periods of the Forsmark units and the SFR in the capacity of engineering geologists performing geotechnical mapping of the underground excavations and acted as advisors on tunnel support; Anders Carlsson participated in the construction works of the cooling water tunnels and the open cut excavations for Forsmark 1, 2 and 3 (geotechnical mapping) and the Forsmark 3 tunnel (advise on tunnel support). Rolf Christiansson participated in the underground works for the SFR (geotechnical mapping, principal investigator for various measurements and advise on tunnel support and grouting). The report is to a great extent based on earlier published material as presented in the list of references. But it stands to reason that, during the course of the work with this report, unpublished notes, diaries, drawings, photos and personal recollections of the two authors have been utilised in order to obtain such a complete compilation of the construction experiences as possible

  2. The impact of common mental disorders on work ability in mentally and physically demanding construction work

    NARCIS (Netherlands)

    Boschman, J. S.; van der Molen, H. F.; Frings-Dresen, M. H. W.; Sluiter, J. K.

    2014-01-01

    To gain insight into (1) the prevalence and incidence of common mental disorders (CMD) and low work ability among bricklayers and construction supervisors; (2) the impact of CMD on current work ability and work ability 1 year later and (3) the added value of job-specific questions about work ability

  3. Occupational Health Hazards of Women Working in Brick Kiln and Construction Industry

    Directory of Open Access Journals (Sweden)

    V. G Vaidya

    2015-01-01

    Full Text Available Background: In brick kiln and construction industry the exposure to carbon monoxide and silica dust is the most common occupational hazard to the workers in these industries. A study on occupational health hazards of working women in these two unorganized sectors was undertaken by Lokmanya Medical Research Centre. Objectives: To study the effect of work site environment on the health of the women working in brick kiln and construction industry. An attempt was also made to study the seasonal changes in the concentration of carbon monoxide and dust at the worksite. Material and Methods: A cross-sectional study was conducted among the working women (age 18-40 years at brick kilns and construction sites during summer and winter season. They were examined primarily to assess the effect of working environment on health. Gasteck Detector Pump of model 800 and air sampling instrument (SKC Air Check–52 were used to measure concentration of carbon monoxide and dust in the air respectively. Results: There were 66% of women who were in the age group of 18-40 years and most of them (94% were married. At brick kiln sites, average CO exposure was 62.8 ppm and 55.5 ppm and average dust exposure was 3 3 146.1 mg/m and 91.4 mg/m in summer and winter season respectively.At construction sites, average dust exposure was 41.5 ppm and 90.8 ppm in summer and winter. Conclusion: Both exposure to CO and dust were more in summer than in winter in brick kiln industry whereas in construction industry the exposure to dust was more in winter season. A high level of morbidity in the form of headache, bodyache, problems with vision, cough and breathlessness were observed in both industries. It is strongly recommended to take pollution control measures.

  4. [Risk factors associated with work-related accidents in the construction industry in the Valley of Mexico].

    Science.gov (United States)

    Sarmiento-Salinas, Rodrigo; López-Rojas, Pablo; Marín-Cotoñieto, Irma Araceli; Godínez-Rocha, Arturo; Haro-García, Luis; Salinas-Tovar, Santiago

    2004-01-01

    Our aim was to describe construction-industry, work-related accident prevalence in, associated factors in, and potential impact on affiliated workers of the Mexican Institute of Social Security (Instituto Mexicano del Seguro Social, IMSS) in the Valley of Mexico. Prevalent cases in a retrospective case-control design. These include 385 construction-industry workers who were found to have construction work-related accidents in 2001. Controls comprised 385 active construction-industry workers without work-related accident background paired by gender, workplace, and worksite. Work-related accident prevalence in construction workers was 5.5%; most important risk factors and etiology fraction (Ef) included the following: age 16-20 years odds ratio, OR = 1.58, 95% confidence interval (95% CI) 1.40-10.7, p = 0.001, Ef 0.36; eventual insurance, OR = 3.7, 95% CI, 2.16-26.45, p = 0.001), Ef, 0.72, and no training for job, OR = 5.3, 95% CI, 4.9-69.2, p = 0.01), Ef: 0.81. Variables not showing significance were included salary, work shift, and workday. Work-related accident prevalence maintains its preponderance in the Valley of Mexico construction industry; identified risk factors are potentially modifiable, among which job training acquires unquestionable relevance.

  5. Determinants of procurement strategy for construction works: quantity surveyors’ perspectives

    Directory of Open Access Journals (Sweden)

    Olanrewaju AbdulLateef

    2016-01-01

    Full Text Available The selection of the ‘appropriate’ procurement strategy is a prerequisite to the success or failure of a construction project. This paper investigates the factors determining the selection of appropriate procurement strategy for construction works in Nigeria. Data for the study was collected through an online survey questionnaire. The survey administration involves only quantity surveyors. Quantity surveyors were targeted because they advise clients and other stakeholders on procurement and contractual issues on construction works. A total of 33 usable responses were received and analysed for this study. On the basis of the results, it is concluded that the selection of procurement strategies for construction depend on complex interrelated factors. The study could not detect a particular factor or few factors responsible for a procurement strategy selection. The findings of this study is useful because it argues that the construction sector needs to broaden its considerations on the procurement strategy’s determinants rather than focusing solely on the client’s type and nature of projects as is often cited. Future research could segment these factors in terms of class of construction works or increase the sample size, which might lead to different findings.

  6. Determinants of dust exposure in tunnel construction work.

    Science.gov (United States)

    Bakke, Berit; Stewart, Patricia; Eduard, Wijnand

    2002-11-01

    In tunnel construction work, dust is generated from rock drilling, rock bolting, grinding, scaling, and transport operations. Other important dust-generating activities are blasting rock and spraying wet concrete on tunnel walls for strength and finishing work. The aim of this study was to identify determinants of dust exposure in tunnel construction work and to propose control measures. Personal exposures to total dust, respirable dust, and alpha-quartz were measured among 209 construction workers who were divided into 8 job groups performing similar tasks: drill and blast workers, shaft drilling workers, tunnel boring machine workers, shotcreting operators, support workers, concrete workers, outdoor concrete workers, and electricians. Information on determinants was obtained from interviewing the workers, observation by the industrial hygienist responsible for the sampling, and the job site superintendent. Multivariate regression models were used to identify determinants associated with the dust exposures within the job groups. The geometric mean exposure to total dust, respirable dust, and alpha-quartz for all tunnel workers was 3.5 mg/m(3) (GSD = 2.6), 1.2 mg/m(3) (GSD = 2.4), and 0.035 mg/m(3) (GSD = 5.0), respectively. A total of 15 percent of the total dust measurements, 5 percent of the respirable dust, and 21 percent of the alpha-quartz exceeded the Norwegian OELs of 10 mg/m(3), 5 mg/m(3), and 0.1 mg/m(3), respectively. Job groups with highest geometric mean total dust exposure were shotcreting operators (6.8 mg/m(3)), tunnel boring machine workers (6.2 mg/m(3)), and shaft drilling workers (6.1 mg/m(3)). The lowest exposed groups to total dust were outdoor concrete workers (1.0 mg/m(3)), electricians (1.4 mg/m(3)), and support workers (1.9 mg/m(3)). Important determinants of exposure were job group, job site, certain tasks (e.g., drilling and scaling), the presence of a cab, and breakthrough of the tunnel. The use of ventilated, closed cabs appeared to be

  7. Treatment thematic progression and consistency in the construction of paragraphs in 7th grade

    Directory of Open Access Journals (Sweden)

    Teresa Iglesias Hernández

    2003-03-01

    Full Text Available This article provides you practic examples of how to implement, in junior high schools, working with TEMA progression and policy coherence, aspects that constitute these dif-tad in most texts written in Teaching concerned.

  8. Construction method for plant facility

    International Nuclear Information System (INIS)

    Ito, Arata; Hirono, Hideharu; Kyoda, Shigeru; Hanawa, Minoru; Sato, Hitoshi

    1998-01-01

    A caisson structure is disposed on a construction site for facilities of nuclear power plants. A digging work is performed below the caisson structure and, simultaneous with the digging work, a construction of a base, construction of plant facilities including a building and installation of plant facility are performed on the caisson structure. Then, the caisson structure is sank together with the structures on a base rock in association with the progress of the digging work and secured on the base rock. When securing them on the base rock, a groove is formed to the base rock along tuyere of the caisson structure so that the tuyere and a ceiling portion of the caisson structure are in direct contact with the base rock. Since the construction for the containing building conducted on the caisson structure is performed simultaneous with the digging work conducted below the caisson structure, the term required for the construction of the plant facilities can greatly reduced. (N.H.)

  9. Darkness and near work: myopia and its progression in third-year law students.

    Science.gov (United States)

    Loman, Jane; Quinn, Graham E; Kamoun, Layla; Ying, Gui-Shuang; Maguire, Maureen G; Hudesman, David; Stone, Richard A

    2002-05-01

    To evaluate myopia prevalence, myopia progression, and various potential myopia risk factors in third-year law students. Cross-sectional study and survey. One hundred seventy-nine third-year law students at the University of Pennsylvania. We administered a questionnaire to assess the prevalence of myopia, myopia progression, and risk factors, including near work, family history, and daily light/dark exposure. We conducted a screening eye examination to ascertain myopia status. Myopia was defined as the mean spherical equivalent of the two eyes of school. (1) prevalence of myopia, (2) progression of myopia. Seventy-nine percent of the class participated (n = 179, two were excluded for amblyopia leaving 177 students). Fifty-eight percent were male, 75% were Caucasian, and the mean age was 27 years. Seventy-nine percent reported parental myopia. The mean amount of near work was 7.4 hours/day; mean sleep was 7.9 hours/day; mean darkness was 5.3 hours/day. Sixty-six percent of the students were myopic. Of 96 participants myopic before law school, myopia increased in 83 (86%) during law school. Among 75 students not myopic at the beginning of law school, 14 (19%) became myopic. The onset of myopia could not be determined for 6 patients. There were trends for higher myopia prevalence among those with a parental myopia history (P = 0.14) and for increased myopia progression among those reporting more daily near work (P = 0.18). Students with 5.6 hours of darkness per day (95% vs. 80%, P = 0.07). To account for possible confounding effects of risk factors with myopia progression, logistic regression with categorization of the continuous exposure variables (hours of near work, sleep, and darkness) above or below median values weakened the near work association (odds ratio 1.8, 95% confidence interval 0.5-6.7, P = 0.35) but continued to identify darkness association with daily hours of darkness (odds ratio 4.8, 95% confidence interval 1.0 >/= 23.3, P students with myopia

  10. Construct validity of the Individual Work Performance Questionnaire.

    OpenAIRE

    Koopmans, L.; Bernaards, C.M.; Hildebrandt, V.H.; Vet, H.C.W. de; Beek, A.J. van der

    2014-01-01

    Objective: To examine the construct validity of the Individual Work Performance Questionnaire (IWPQ). Methods: A total of 1424 Dutch workers from three occupational sectors (blue, pink, and white collar) participated in the study. First, IWPQ scores were correlated with related constructs (convergent validity). Second, differences between known groups were tested (discriminative validity). Results: First, IWPQ scores correlated weakly to moderately with absolute and relative presenteeism, and...

  11. Design progress of the VV sectors and ports towards the ITER construction

    International Nuclear Information System (INIS)

    Utin, Yu.; Ioki, K.; Bachmann, C.

    2007-01-01

    The ITER vacuum vessel (VV) is an all-welded torus-shaped double-wall structure with stiffening ribs between the shells. The VV main function is to provide the high-vacuum and primary confinement boundary. The vessel also supports in-vessel components such as the blanket modules and the divertor cassettes. Along with these components, the VV provides radiation shielding - the neutron heat is removed by water circulating between the shells. To satisfy the manufacture and assembly needs, the VV consists of nine sectors. To provide access inside the vessel for auxiliary plasma heating, diagnostics, vacuum pumping and other needs, the VV is equipped with upper, equatorial and lower ports. The upper and regular equatorial ports are occupied with the port plugs. In addition, there are three ports at the equatorial level dedicated for neutral beam (NB) injection. As the ITER construction phase approaches, the VV design has been improved and developed in more detail with the focus on improved manufacture and reduced cost. Based on achievements of manufacturing studies being performed in cooperation with industry, design improvement of the typical VV sector (1) has been nearly finalized. Design improvement of other sectors is in progress - in particular, of the VV sectors 2 and 3 which interface with the NB ports. For all sectors, the concept for the in-wall shielding has been improved and developed in more detail. The design progress of VV sectors 2-3 has been accompanied by progress in the NB port design (including the beam-facing components to handle the heat flux input of the neutral beams). Design of other port structures has also progressed. Thus, supporting and sealing components between the port plugs and the ports have been further developed with the focus on improved structural performance and maintenance. At the lower level, there are full-size ports, and the pipe feedthroughs and local small penetrations. Design of all port structures at this level has

  12. Methodology discourses as boundary work in the construction of engineering education.

    Science.gov (United States)

    Beddoes, Kacey

    2014-04-01

    Engineering education research is a new field that emerged in the social sciences over the past 10 years. This analysis of engineering education research demonstrates that methodology discourses have played a central role in the construction and development of the field of engineering education, and that they have done so primarily through boundary work. This article thus contributes to science and technology studies literature by examining the role of methodology discourses in an emerging social science field. I begin with an overview of engineering education research before situating the case within relevant bodies of literature on methodology discourses and boundary work. I then identify two methodology discourses--rigor and methodological diversity--and discuss how they contribute to the construction and development of engineering education research. The article concludes with a discussion of how the findings relate to prior research on methodology discourses and boundary work and implications for future research.

  13. [Work reality and the construction process of the nurse's identity].

    Science.gov (United States)

    Netto, Laura Filomena Santos de Araújo; Ramos, Flávia Regina Souza

    2002-01-01

    This study tries to understand the relation between the reality of the nurse's everyday work and the construction process of this identity, using Agnes Heller's sociological theory of everyday life as the main reference. The possibilities of the worker's expression and fulfillment occur through objective and subjective elements of job reality which comes upon the worker as people who put order and tension in their everyday job; these job determinants imprint and produce impacts, giving sense to the work quality and constructing concrete possibilities to the worker to manifest him/herself as Whole being, guiding the construction of his/her identity.

  14. Costs and benefits of flexible workspaces : work in progress in The Netherlands

    NARCIS (Netherlands)

    van der Voordt, Theo

    2003-01-01

    Due to the rapid progress in information and communication technology, work is becoming more and more independent of time and place. New concepts such as cocon offices (with special attention to both communication and concentration), teleworking, satellite offices, and hotel offices have been

  15. Compliance as process: Work safety in the Chinese construction industry

    NARCIS (Netherlands)

    Li, Na

    2016-01-01

    China is facing a key challenge of achieving compliance in many regulatory areas. Responding to such issue, this research reports on an exploratory empirical study of how the regulated construction businesses comply with work safety rules in China. Building on the existing literature, it develops a

  16. Work performance and tax compliance in flat and progressive tax systems

    NARCIS (Netherlands)

    Pantya, Jozsef; Kovacs, Judit; Kogler, C.; Kirchler, Erich

    2016-01-01

    Different tax systems, and their impact on work motivation and tax compliance are significant issues in contemporary political and economic debates. The proportional feature of a flat tax system is assumed to lead to higher performance, while the fairness of the redistributive progressive tax system

  17. The Struggles of Women Industrial Workers To Improve Work Conditions in the Progressive Era.

    Science.gov (United States)

    Barrett, Nancy J.

    1999-01-01

    Offers a lesson plan that addresses the working conditions endured by women in the Progressive Era and their struggles for womens rights in the workplace. Strives to demonstrate the similarities between the plights of the Progressive Era women to those of women workers in the 1990s. (CMK)

  18. Proximity Works and carry-over method without ground improvement in the construction works by shield method

    Energy Technology Data Exchange (ETDEWEB)

    Watanabe, Jun; Taki, Hideharu; Teraoka, Yoshiaki [Chubu Electric Power Co., Inc., Nagoya (Japan)

    1989-06-01

    Chubu Electric Power Co. is promoting to introduce ultrahigh-voltage transmission line into Nagoya City in order to supply electric power to the central area of the city. As a part of this project, the company constructed the tunnel extending 1400m long in the central area of Nagoya City by shield method. In the area around the route of this tunnel, high buildings for residence stand close together, the traffic is heavy, and also four railway lines cross over the tunnel. The important points of this construction are curved surface works of the tunnel at the main intersections, crosscutting works at the major trunk railway lines, and shield carry-over method. The finished inside diameter of the tunnel is 3.6m and it is protected by the primary lining of 175mm in thickness and by the secondary one of 200mm in thickness. As the construction is performed at the intersections where traffic is heavy, or required curved surface works, it must be carried out without the process of ground improvement such as chemical injection. Therefore, excavation was performed through high strength stratum, utilizing the strength of soil itself. At the portion where the tunnel runs across main railway line, it was taken in account that high strength stratum should remain as cover rock, and excavation was performed beneath the rock. At the end portion of shield, soil pile column with H-formed steel and steel bulk head were used as means of landslide protection. Thus, the ease operation and economic execution of works were realized. 1 ref., 14 figs., 2 tabs.

  19. Algorithm of composing the schedule of construction and installation works

    Science.gov (United States)

    Nehaj, Rustam; Molotkov, Georgij; Rudchenko, Ivan; Grinev, Anatolij; Sekisov, Aleksandr

    2017-10-01

    An algorithm for scheduling works is developed, in which the priority of the work corresponds to the total weight of the subordinate works, the vertices of the graph, and it is proved that for graphs of the tree type the algorithm is optimal. An algorithm is synthesized to reduce the search for solutions when drawing up schedules of construction and installation works, allocating a subset with the optimal solution of the problem of the minimum power, which is determined by the structure of its initial data and numerical values. An algorithm for scheduling construction and installation work is developed, taking into account the schedule for the movement of brigades, which is characterized by the possibility to efficiently calculate the values of minimizing the time of work performance by the parameters of organizational and technological reliability through the use of the branch and boundary method. The program of the computational algorithm was compiled in the MatLAB-2008 program. For the initial data of the matrix, random numbers were taken, uniformly distributed in the range from 1 to 100. It takes 0.5; 2.5; 7.5; 27 minutes to solve the problem. Thus, the proposed method for estimating the lower boundary of the solution is sufficiently accurate and allows efficient solution of the minimax task of scheduling construction and installation works.

  20. C.A.R. insurance and its significance in the construction of power plants

    International Nuclear Information System (INIS)

    Friedrich, J.

    1975-01-01

    The construction of a power lant entails a multitude of risks for the operator and for all parties participating in the construction. The progress of construction technology, reduced manufacturing times and new construction materials and methods result in greater risks. As a property insurance, C.A.R. insurance covers unforeseen destruction of or damage to the construction works from commencement of construction until handling over. It is thereby irrelevant whether such loss or damage falls to the burden of the principal or the contractors and craftsmen. In the event of loss or damage occurring, the search for those responsible is thus eliminated. Rectification of the loss or damage and continuation of the work is not delayed. (orig.) [de

  1. Towards green construction

    International Nuclear Information System (INIS)

    Bajracharya, Bijaya B.; Shrestha, Prasanna M.

    2000-01-01

    Sustainability is the key to any development works. In the operation phase, hydro power is the most sustainable form of energy. However construction activities for the same power station are usually far from being green. The popular myth is that construction activity converts green into grey. Despite this popular myth, construction of a hydro power project in Nepal has made the project area greener than earlier during the construction phase itself. Choice of construction technology, appropriate level of environmental impact assessment, monitoring of environmental parameters along side the construction progress followed by mitigation at the right time; launching community development programmes side by side, having environmental specification in contractual documents and self-reliance to fulfill environmental obligations by contractors itself are the key factors in the environmental management within the construction activities. The main conclusions in the paper is the need to change the way to think about the project constraints

  2. Regulation regarding the reception of the construction works and the corresponding installations in Romania

    Directory of Open Access Journals (Sweden)

    Simona Chirică

    2017-12-01

    Full Text Available The new Regulation regarding the reception of construction works and corresponding installations, approved by Government's Decision no. 347/2017 (“Regulation 2017” has general applicability for all construction works for which there is an obligation to obtain a building permit. Regulation 2017 brings significant changes and clarifications expected by the real estate sector regarding: (i the composition of the commissions involved in the reception procedure, (ii the role of the site supervisor who thus gains significant participation in the reception procedure, and (iii the participation of the public authorities' representatives at the reception, having the veto right on the decision of the reception commission upon the completion of the construction works. Another element of novelty brought by Regulation 2017 is the possibility to do the reception upon the completion of the construction works, respectively the final reception for parts / objectives / sectors of or from the building, if they are distinct/ independent from a physical and functional point of view. Thus, the new regulation facilitates the procedure of authorizing investment objectives and the costs of the process. The partial reception is another innovation brought by the Regulation 2017 in support of the investor, who can thus take over a part of the construction, at a certain stage, and obtain its registration with the Land Book.

  3. Inclusion at Work DEOCS 4.1 Construct Validity Summary

    Science.gov (United States)

    2017-08-01

    Inclusion at Work DEOCS 4.1 Construct Validity Summary DEFENSE EQUAL OPPORTUNITY MANAGEMENT INSTITUTE DIRECTORATE...Report #10-18 1 Inclusion DEOCS 4.1 Construct Validity Summary Background In 2011, the Department of Defense (DoD) published the Government-Wide...Diversity and Inclusion Strategic Plan that established a government-wide initiative to promote Diversity and Inclusion . While the military is a

  4. Construction work organization at the Paluel NPP (France)

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    Construction work organization at French Paluel NPP, comprising four 1300 MWe power units with PWR type reactors, has been described. Ground works have been performed by three excavating machines with dipper capacity 5.5, 7.6 and 8.3 m 3 , total productivity of them reaching 1200 m 3 /hr. To transport the ground 22 dump trucks with bulk body capacity 18 cm 3 , load-carrying capacity 35 t were used. Each dump truck was loaded in 49-90 s, daily average productivity reached 45000 m 3 , which permitted to fulfil the ground works in two years. To produce concrete mixture at the NPP construction site a concrete plant is built with the productivity 160 m 3 /hr with two computer-controlled concrete-mixing installations. Concrete-placing machines with a telescopic boom transported concrete mixture to 42 m at the boom inclination up to 30 deg. Them the mixture was transported by belt conveyers with the length of a separate link 30 m and it was supplied to rotating conveyer, permitting to place concrete in the radius of 12.5 m at the angle of approximately 24 deg. The rate of placement of concrete in cylindrical part of containment reached 10 m/month and was realized by two concrete-delnvery pipelines up to 118 m long. When erecting building constructions 14 tower cranes with load-carrying capacity of 3-15 t and one tower crane with load carrying capacity of 500 t were used

  5. Work in Progress: Gender and Politics in Late Elizabethan Progress Entertainments

    Science.gov (United States)

    Kolkovich, Elizabeth Zeman

    2009-01-01

    This dissertation analyzes the understudied dramatic genre of Elizabethan progress entertainments, the political ideologies it conveys, and especially the female alliances it enacts. Aristocrats staged these outdoor, episodic pageants on their country estates during Elizabeth I's summer "progress" visits, 1575-1602. While previous scholars…

  6. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    Science.gov (United States)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  7. Perception of Construction Participants in Construction delays: A case study in Tamilnadu, India.

    Science.gov (United States)

    Rathinakumar, V.; Vignesh, T.; Dhivagar, K.

    2017-07-01

    Delays in the construction industry are universal fact, which affects the construction participants. The research work spotlights on determining the prevailing delays in the cities of Tamil Nadu, as perceived by the participants. After a few field level interactions, a questionnaire was framed and administered to the participants i.e., Consultants (50 Nos.), contractors (50 Nos.) and clients (150 Nos.) to understand their perception on the causes of delays. The factors for delay was categorized into 4 groups say Improper project planning, Design related issues, Finance related issues and Resource related issues. The responses were analysed using the SPSS software by applying ANOVA and Regression analysis. From the analysis, it was found that the personal financial problems of the client dominantly affect the entire construction progress and the subsequent design changes by the clients, Inadequate early project planning, labour related issues. Also, the delay groups were found to be the improper project planning and the Resource related issues.

  8. Highway construction work zone safety performance and improvement in Louisiana : research project capsule.

    Science.gov (United States)

    2016-08-01

    While the number of : crashes in Louisiana : construction work zones : has decreased in recent : years, the total count of : work zone crashes is still : significant, warranting : research into how to reduce : crashes. An assessment : of risk factors...

  9. Progress report 1981

    International Nuclear Information System (INIS)

    After giving a brief description of operations of an improvements to the University of Alberta nuclear physics facilities, this report summarizes the principal research programs. These include work on neutron scattering, thorium 232 fission, iodine 123 production. Progress towards the construction of MARIA, the Medical Accelerator Research Institute in Alberta, is described, and research on relativistic heavy ions is summarized

  10. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthélemy, Michel; Escobar Rangel, Lina

    2015-01-01

    This paper provides an econometric analysis of nuclear reactor construction costs in France and the United States based on overnight costs data. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using change in expected electricity demand as instrument. We argue that the construction of nuclear reactors can benefit from standardization gains through two channels. First, short term coordination benefits can arise when the diversity of nuclear reactors' designs under construction is low. Second, long term benefits can occur due to learning spillovers from past constructions of similar reactors. We find that construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect–Engineer. In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. -- Highlights: •This paper analyses the determinants of nuclear reactors construction costs and lead-time. •We study short term (coordination gains) and long term (learning by doing) benefits of standardization in France and the US. •Results show that standardization of nuclear programs is a key factor for reducing construction costs. •We also suggest that technological progress has contributed to construction costs escalation

  11. Psychosocial work environment and mental health among construction workers

    NARCIS (Netherlands)

    Boschman, J. S.; van der Molen, H. F.; Sluiter, J. K.; Frings-Dresen, M. H. W.

    2013-01-01

    We assessed psychosocial work environment, the prevalence of mental health complaints and the association between these two among bricklayers and construction supervisors. For this cross-sectional study a total of 1500 bricklayers and supervisors were selected. Psychosocial work characteristics were

  12. Progress in ZEBs—A review of definitions, policies and construction activity

    International Nuclear Information System (INIS)

    Panagiotidou, Maria; Fuller, Robert J.

    2013-01-01

    The aim of this paper is to review three interlinked aspects of Zero Energy (or Emissions) Buildings (ZEB): definitions, government policies and construction activity. It is critical to understand the current status of these three aspects in order to advance the ZEB concept. In broad terms, a ZEB can be described as a residential or commercial building with greatly reduced energy needs and/or carbon emissions, achieved through efficiency gains, such that the balance of energy needs can be supplied by renewable energy. The paper explores how leading countries have defined and are implementing the concept of ZEBs. Although the term ZEB can be used for both commercial and residential buildings, the paper is limited to the latter since this sector produces the greatest amount of emissions. Case studies are used to illustrate the current level of understanding in various countries. The paper concludes that although the term ZEB has been used for some time, there is still no globally-agreed definition or pathway to it. In addition, construction progress is still limited to demonstration projects located in or driven by countries which have already established ZEB policies or a tradition in low energy buildings. -- Highlights: •Not enough ZEBs globally and activity levels are too slow. •No evidence of consensus emerging over ZEB definition. •Countries that have ZEB policies are encountering resistance from building industry. •ZEB definitions and policies focus only on operational energy use

  13. Work safety in the light of technological progress in mining. [Poland, accident and technology assessment for period 1950 to 1972

    Energy Technology Data Exchange (ETDEWEB)

    Stecko, R.

    1976-01-01

    This paper discusses positive and negative aspects of technological progress in black coal mining in Poland in the period from 1950 to 1972 on the basis of statistical data supplied by various institutions. Twenty three indexes characterizing both work safety and technological progress in underground coal mines are used. Equations of linear and non-linear even regression and equations of linear and non-linear multiple regression are derived on the basis of statistical records of 23 years. The equations are used to estimate indexes of work safety on the basis of technical progress indexes. It is suggested that from among 8 indexes characterizing work safety 4 are most useful and important: danger index, absenteeism index, frequency of underground fire index, and frequency of rock burst index. Analysis of the regression equation shows that technological progress in underground coal mines in Poland has caused a decrease in indexes describing: frequency of work accidents, frequency of underground fires, frequency of rock burst, and danger of underground work; and an increase in indexes characterizing: seriousness of work accidents, and absenteeism caused by work accidents. (84 refs.)

  14. Recent progress in fusion gyrotron development

    International Nuclear Information System (INIS)

    Shively, J.F.; Stone, D.S.

    1981-01-01

    The gyrotron, a microwave tube capable of producing high power output at millimeter wavelengths, has recently found applications for electron cyclotron resonance heating of plasmas in controlled thermonuclear fusion reactor experiments. This paper describes work in progress to develop a gyrotron oscillator to deliver 200 kW CW at 60 GHz (/lambda/sub //. 5 mm). A pulsed oscillator is described which produced over 200 kw peak power. A CW oscillator is under construction. The latest experimental results are presented

  15. Why a Train Set Helps Participants Co-Construct Meaning in Business Model Innovation

    DEFF Research Database (Denmark)

    Beuthel, Maria Rosa; Buur, Jacob

    In this position paper we show how participants in an innovation workshop employ tangible material – a toy train set – to co-construct understandings of a new business model. In multidisciplinary teams the process of developing new terms and concepts together is crucial for work to progress. Every...... to understand how they construct a concept. We observe that the final result of the workshop is indeed innovative and is co-constructed by all group members. We discuss why the toy train works: It keeps both hands and mind busy, it allows silent participation, and it expands the vocabulary of the discussion....

  16. Review: Trabalhos em Curso. Etnografia de operários portugueses da construção civil em Espanha : Work in Progress. Ethnography of Portuguese workers in construction in Spain

    NARCIS (Netherlands)

    Cremers, Jan

    2017-01-01

    In recent decennia, thousands of Portuguese workers were weekly commuting to Spain, the neighbouring country, in search of labour. Many of them worked in the construction sector. This book reproduces part of the results of an investigation into this phenomenon carried out under the project ‘Recent

  17. Construction work of superstructure of twin harp bridge. Twin harp kyo jobuko no seko

    Energy Technology Data Exchange (ETDEWEB)

    Sasaki, H.; Sato, Y.; Kanazawa, Y. (Sumitomo Construction Kajima Corp. Dopy Construction Co. Ltd. Nihon Koatsu Concrete Co. Ltd. Joint Venture, Tokyo (Japan)); Sema, M. (Sumitomo Construction Co. Ltd., Tokyo (Japan))

    1991-11-30

    Construction plan outline of PC cable stayed bridge with main tower having one pillar structure is introduced and this is the first type of bridge in Japan with three continuous span design. Construction was commenced on 7 July, 1989 and was completed on 8 August, 1991 at south east of Ashahikawa, Hokkaido. Construction outline is consisted of Principal specifications, general layout of structure, construction order and overall stage of the construction work. Main tower is described by its outline, jump system, installation of diagonal member anchorage device, formwork and concrete structure, and cross beam construction has included four parts which are outline, capital part, projected part construction, lateral span and closure part, and central control span and closure part. Outline, cable guard and erection work, cable work, work Procedure of cable taut construction using total taut method, tension adjustment of cable and grouting, for diagonal member are explained. The construction control items specific to cable stayed bridge are diagonal member tension control( control of applied tension, change of tension with time and test taut ) and camber control. Practical vibration test was carried out on March, 1991. 8 refs., 15 figs., 5 tabs.

  18. Construction experiences from underground works at Oskarshamn. Compilation report

    International Nuclear Information System (INIS)

    Carlsson, Anders; Christiansson, Rolf

    2007-12-01

    The main objective with this report is to compile experiences from the underground works carried out at Oskarshamn, primarily construction experiences from the tunnelling of the cooling water tunnels of the Oskarshamn nuclear power units 1,2 and 3, from the underground excavations of Clab 1 and 2 (Central Interim Storage Facility for Spent Nuclear Fuel), and Aespoe Hard Rock Laboratory. In addition, an account is given of the operational experience of Clab 1 and 2 and of the Aespoe HRL on primarily scaling and rock support solutions. This report, as being a compilation report, is in its substance based on earlier published material as presented in the list of references. Approximately 8,000 m of tunnels including three major rock caverns with a total volume of about 550,000 m 3 have been excavated. The excavation works of the various tunnels and rock caverns were carried out during the period of 1966-2000. In addition, minor excavation works were carried out at the Aespoe HRL in 2003. The depth location of the underground structures varies from near surface down to 450 m. As an overall conclusion it may be said that the rock mass conditions in the area are well suited for underground construction. This conclusion is supported by the experiences from the rock excavation works in the Simpevarp and Aespoe area. These works have shown that no major problems occurred during the excavation works; nor have any stability or other rock engineering problems of significance been identified after the commissioning of the Oskarshamn nuclear power units O1, O2 and O3, BFA, Clab 1 and 2, and Aespoe Hard Rock Laboratory. The underground structures of these facilities were built according to plan, and since than been operated as planned. Thus, the quality of the rock mass within the construction area is such that it lends itself to excavation of large rock caverns with a minimum of rock support

  19. Construction experiences from underground works at Oskarshamn. Compilation report

    Energy Technology Data Exchange (ETDEWEB)

    Carlsson, Anders (Vattenfall Power Consultant AB, Stockholm (SE)); Christiansson, Rolf (Swedish Nuclear Fuel and Waste Management Co., Stockholm (SE))

    2007-12-15

    The main objective with this report is to compile experiences from the underground works carried out at Oskarshamn, primarily construction experiences from the tunnelling of the cooling water tunnels of the Oskarshamn nuclear power units 1,2 and 3, from the underground excavations of Clab 1 and 2 (Central Interim Storage Facility for Spent Nuclear Fuel), and Aespoe Hard Rock Laboratory. In addition, an account is given of the operational experience of Clab 1 and 2 and of the Aespoe HRL on primarily scaling and rock support solutions. This report, as being a compilation report, is in its substance based on earlier published material as presented in the list of references. Approximately 8,000 m of tunnels including three major rock caverns with a total volume of about 550,000 m3 have been excavated. The excavation works of the various tunnels and rock caverns were carried out during the period of 1966-2000. In addition, minor excavation works were carried out at the Aespoe HRL in 2003. The depth location of the underground structures varies from near surface down to 450 m. As an overall conclusion it may be said that the rock mass conditions in the area are well suited for underground construction. This conclusion is supported by the experiences from the rock excavation works in the Simpevarp and Aespoe area. These works have shown that no major problems occurred during the excavation works; nor have any stability or other rock engineering problems of significance been identified after the commissioning of the Oskarshamn nuclear power units O1, O2 and O3, BFA, Clab 1 and 2, and Aespoe Hard Rock Laboratory. The underground structures of these facilities were built according to plan, and since than been operated as planned. Thus, the quality of the rock mass within the construction area is such that it lends itself to excavation of large rock caverns with a minimum of rock support

  20. The Socio-Economics of Women Inclusion in Green Construction

    Directory of Open Access Journals (Sweden)

    Adedeji Olushola Afolabi

    2017-03-01

    Full Text Available The female population represents one of the greatest untapped resources for economic growth and revitalization in most sectors. The purpose of the study was to examine the socio-economics of women’s inclusion in green construction. The study utilized the use of questionnaires which were distributed to female professionals in the Nigerian construction industry. A total of 120 female construction professionals were used for this study. The data gathered was analysed using SPSS v17.0 with tests such as Frequencies, Percentages, Mean Score, ANOVA, and Factor Analysis. The result revealed a low level of participation by women in green construction. Women in construction exhibited moderate participation in Solar panel manufacturing, installation, and maintenance and in the enforcement of environmentally friendly practices on-site. The study revealed that the stressful nature of works, low interest from women, low career growth/progression and low investments in green works are significant barriers affecting women’s inclusion in green construction. In conclusion, the study identified three (3 socio-economic benefits of women’s inclusion in green construction. These are family/women related benefits, environment related benefits, and green energy market related benefits. The study suggested measures to increase women’s participation in green construction.

  1. The construction of work-life balance: the experience of black employees in a call-centre environment

    OpenAIRE

    Potgieter, Sónia C.B.; Barnard, Antoni

    2010-01-01

    ORIENTATION: Work-life balance, as a crucial aspect of employee and organisational wellness, remains an interesting field of research, especially due to the changing demographic employee profile. RESEARCH PURPOSE: The objective of the study was to explore Black employees' construction of work-life balance in a customer care environment. MOTIVATION FOR THE STUDY: The conceptual debate regarding the construct of work-life balance in general as well as limited qualitative research with regard to...

  2. Progress report for 1988/89 from the Waste Treatment and Disposal Working Party covering joint funded work

    International Nuclear Information System (INIS)

    Claxton, D.G.S.A.

    1989-05-01

    The report covers progress in the area of ILW Product Evaluation. This work is a continuation of a generic study programme directed by the Waste Treatment and Disposal Working Party. The objective of the programme was to evaluate potential waste products arising from the treatment of ILW. (author)

  3. Improving patient safety in radiology: a work in progress

    International Nuclear Information System (INIS)

    Sze, Raymond W.

    2008-01-01

    The purpose of this paper is to share the experiences, including successes and failures, as well as the ongoing process of developing and implementing a safety program in a large pediatric radiology department. Building a multidisciplinary pediatric radiology safety team requires successful recruitment of team members, selection of a team leader, and proper and ongoing training and tools, and protected time. Challenges, including thorough examples, are presented on improving pediatric radiology safety intradepartmentally, interdepartmentally, and institutionally. Finally, some major challenges to improving safety in pediatric radiology, and healthcare in general, are presented along with strategies to overcome these challenges. Our safety program is a work in progress; this article is a personal account and the reader is asked for tolerance of its occasional subjective tone and contents. (orig.)

  4. Research Progress of Building Materials Used in Construction Land

    Science.gov (United States)

    Niu, Yan

    2018-01-01

    Construction land preparation is an important aspect of land remediation project. The research of materials in the process of land improvement is the foundation and the core. Therefore, it is necessary to study the materials that may be involved in the process of building land preparation. In this paper, the research on the construction materials such as recycled concrete, geosynthetics, soil stabilizers, soil improvers, building insulation materials and inorganic fibrous insulation materials, which are commonly used in construction sites, is reviewed and discussed in this paper. Land remediation project involved in the construction of land materials to provide reference.

  5. Epidemiology of work-related injuries among insured construction workers in Iran.

    Science.gov (United States)

    Hatami, Seyed Esmaeil; Ravandi, Mohammad Reza Ghotbi; Hatami, Seyedeh Tayebeh; Khanjani, Narges

    2017-11-01

    Work-related injuries are among the most important health problems in developing countries, such as Iran. The purpose of this study was to determine the epidemiology of work-related injuries among construction workers who had been insured by the Iranian Social Security Organization (ISSO). This is a cross-sectional study. The population included all construction workers who had a work- related accident during 2012 in Iran, which were recorded in the ISSO database after inspection. The effects of independent variables on injuries were estimated by logistic regression. SPSS software version 18 was used for analyzing the data. Overall, 5352 work-related injuries were investigated. The incidence rate of fatal and nonfatal injuries was 0.07 in 1000 and 11.18 in 1000 workers, respectively. More than half of these accidents were due to careless activities. A younger age at the time of the accident (OR=0.98, CI: 0.97-0.99, p=0.001), being married (OR=1.37, CI: 1.04-1.79, p=0.02), place of accident (OR=1.86, CI: 1.18-2.92, p=0.007), lack of information (OR=5.28, CI: 1.57-17.75, p=0.007), disrespect of safety regulations (OR=3.11, CI: 1.87-5.17, p=0.001), non-use of protective equipment (OR=2.98, CI: 1.62-5.50, p=0.001), and defective equipment (OR=2.22, CI: 1.18-4.20, p=0.01) had a significant effect on the incidence of work-related injury. The pattern of work-related injury in Iran was almost similar in regard to age, gender, cause and type of the accident, with other parts of the world.

  6. Payroll costs not identified by phase in construction work done with no third subcontracted

    Directory of Open Access Journals (Sweden)

    Rubén Antonio González Franco

    2012-05-01

    Full Text Available The Social Insurance Regulations applicable to the construction companies with regard to meeting high work requires the owner to generate high for each construction phase and thus to check the amounts of materials, machinery and equipment, as well as labor applied at the same stage, all in order to validate that it complies 100% with the payment of worker-employer contributions by the employer, guidelines in the specific case of SMEs practice becomes more complex, controls as these companies have no proof phased costs in two areas in particular, as are exercised costs of materials and workmanship for housing, which is why this research aims to solve the problem of generating clear guidelines to comply with the verification of payment of contributions in the field of labor when it is exerciseddirectly, and through the application of direct interviews and questionnaires to the units of analysis consists of businessmen, representatives, directors or business accountants SMEs construction, staff of the National Chamber of construction Industry and the Mexican Social Security Institute head of the Department of construction, who will answer questions the same instrument provides, and with this it was determined that in fact the perception of these SMEs is required to leave a standard criterion for testing and would be more appropriate apportionment of costs proportionately based on hire dates and termination dates of the work keeping track of costs identifying overall, leaving an identification number in the working papers for further review by the authority.

  7. Constructing Work and Subjectivities in Precarious Conditions: Psycho-Discursive Practices in Young People’s Interviews in Greece

    Directory of Open Access Journals (Sweden)

    Georgios Kesisoglou

    2016-03-01

    Full Text Available Precarity is becoming the paradigmatic description of young people’s work conditions in crisis-ridden Greece, but also in other European countries. Focusing on interview data on the work experiences of young adults (18-26 years old, in urban centres of Greece, this study attempts to explore the ways in which informants account for working in precarious conditions and construct agency and subjectivity within these ways of accounting. The analysis drawing on insights from critical discursive social psychology indicates that participants construct precarious work conditions as widespread and banal a by treating precarious work as a sine qua non condition of youth employment, b by considering precarious work as an inherent trait of the Greek job-market, c by considering precarious work as a necessary step on a (biographical path leading to the desired and/or appropriate job, or d by adopting a “there is no other alternative” accounting, representing precarious job conditions as the only alternative to unemployment. The analysis also points out the ways in which participants orient themselves to a dilemma of stake and accountability, being concerned to position themselves as effortful subjects, while they are rhetorically constructing the banal regime of precarious labour. The discussion considers the need to bring into the scope of social and political psychology the specific nuances of precarious labour.

  8. Musculoskeletal Disorders study in damming construction workers by Fox equation and measurement heart rate at work

    Directory of Open Access Journals (Sweden)

    L. Gheibi

    2008-04-01

    Full Text Available Background and aims   Musculoskeletal Disorders are prevalent in construction workers in comparison to other working groups. These workers in damming construction worked at awkward  postures for long times, so ergonomic assessment of jobs was important.   Methods   This is a descriptive-analytical cross sectional study that conducted in 2008 on a random sample of workers of damming construction in Takab city (110 men who were assessed by Nordic Musculoskeletal questionnaire and digital indicator for heart measurement. To estimate  Vo2max consumption Fox equation was used and data were analyzed by SPSS software.   Results   The average of total time of worked was 36.6 86.8 months. Results showed that the  most prevalent (%55.5 MSDs was low back pain which was positively related with type of job,  the number of standing and sitting posotions at work, total time of work, age, smoking, level of   education, weight,Vo2max that estimated by Fox Equation, and heart rate at working (P<0.05.   Conclusion   The results of this study reveal that prevalence rate of musculoskeletal disorders are high among damming construction workers, and heart rate and Vo2max consumption increases with increase in work load. Therefore, optimal physiological conditions should be considered  and physical capacity be measured. Prior to employment of workers approperiate corrections are  warranted      

  9. Demonstration of energy-saving construction works; Shoshigenka wo mezashita kenchiku koji no jissho kenkyu

    Energy Technology Data Exchange (ETDEWEB)

    Kobayashi, T.; Yamagishi, M.; Kakimi, S. [Chubu Electric Power Co. Inc., Nagoya (Japan)

    1997-11-01

    Studies are conducted to promote energy-saving in construction works as part of environment protection programs. The first phase is for survey and analysis works for energy-saving in the current building design and construction works, and for processes, procedures and materials in model works (construction of sub-stations). The second phase is for studying energy-saving designs, materials and procedures, which are applied to model works, to assess their energy-saving effects , costs and applicability. The horizontally developed samples are prepared for the future development, based on the `continuous improvement of environment-management systems by establishing the PDCA cycles,` which is one of the basic requirements of the ISO14001 (environment management system). These efforts have reduced CO2 emissions associated with the manufacture of construction materials by 20%, mixed wastes by 45%, and plywood frame requirement by 70%. It is also confirmed that they can be realized at only around 3% higher cost. 9 refs., 10 figs., 3 tabs.

  10. MEA progress report, no. 10; 1st half year 1976

    International Nuclear Information System (INIS)

    1976-01-01

    A survey is given of the progress on the construction of the 300MeV MEA Linac at IKO, Amsterdam. The progress report deals with the construction of the linac itself with auxiliary components as well as the testing of these components, the work at the different experimental stations: the 100MeV chemical station, the 100MeV physics station, the 300MeV electron scattering station, the pion facility and the 300MeV chemical station

  11. Relation Between Near Work and Myopia Progression in Student Population

    Science.gov (United States)

    Muhamedagic, Lejla; Muhamedagic, Belma; Halilovic, Emina Alimanovic; Halimic, Jasmina Alajbegovic; Stankovic, Aleksa; Muracevic, Bedrana

    2014-01-01

    Aim To determine relation between near work and myopia progression in student population. Causes of myopia occurrence are not sufficiently explained. Methods This retrospective-prospective, descriptive research included 100 students with verified myopia up to -3 Dsph. Ophthalmological examination and measurement diopter-hours variable (Dh) were done twice, in the period from January 2011 until January 2012. Results A multivariate regression analysis of impact on the difference of distance visual acuity without correction to the right and left eye and difference of automatic computer refractometry in cycloplegia of both eyes indicates that, diopter-hours variable (Dh) had statistically significant impact on increase of distance visual acuity difference (right eye OR: I measurement–Dh 1.489, II measurement–Dh 1.544, prefractometry in cycloplegia (right eye OR: I measurement 1.361, II measurement 1.493, p<0.05; left eye OR: I measurement 0.931, II measurement 1.019, p<0.05) during both measurements. Conclusion Near work cause the increase of myopia. This research opened a perspective for other researches on the impact of near work on myopia. PMID:24944532

  12. Under Construction: An Experiential Exercise Illustrating Elements of Work Design

    Science.gov (United States)

    Donovan, Kimberly M.; Fluegge-Woolf, Erin R.

    2015-01-01

    The Under Construction Exercise was developed by the authors to highlight key factors of work design that when implemented among the work group or entire organization can lead to an environment conducive to fostering satisfaction and motivation. In the exercise, groups are assigned to one of four different conditions that are designed to emulate…

  13. 25 CFR 1000.244 - May the Secretary suspend construction activities under an AFA?

    Science.gov (United States)

    2010-04-01

    ... construction activities under an AFA? (a) The Secretary may require a Tribe/Consortium to suspend certain work under a construction portion of an AFA for up to 30 days only if: (1) Site conditions adversely affect health and safety; or (2) Work in progress or completed fails to substantially carry out the terms of the...

  14. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  15. Overweight and obesity are progressively associated with lower work ability in the general working population: cross-sectional study among 10,000 adults.

    Science.gov (United States)

    Andersen, Lars L; Izquierdo, Mikel; Sundstrup, Emil

    2017-11-01

    Obesity is associated with many diseases and functional limitations. Workplaces are not always designed to accommodate this challenge. This study investigated the association between body mass index (BMI) and work ability in the general working population. Currently employed wage earners (N = 10,427) from the 2010 round of the Danish Work Environment Cohort Study (DWECS) replied to questions about work and health. Cumulative logistic regression analyses controlling for age, gender, physical and psychosocial work factors, lifestyle, and chronic diseases modeled the associations between BMI and work ability. BMIs above the normal range were progressively associated with lower work ability in relation to the physical demands of the job. Odds ratios for having lower work ability were 1.11 (95% CI 1.01-1.22), 1.17 (95% CI 1.01-1.34), 1.43 (95% CI 1.09-1.88), 1.69 (95% CI 1.10-2.62) for overweight and obesity classes I, II, and III, respectively. In subgroup analyses, the associations between BMI and work ability were more pronounced among individuals with mainly sedentary work than among those with physically active work. BMI was not associated with work ability in relation to the mental demands of the work. BMIs above the normal range are progressively associated with lower work ability in relation to the physical demands of the job, especially among individuals with mainly sedentary work. Ergonomic research on how to optimally design workstations for workers with obesity are needed.

  16. 18 CFR 35.25 - Construction work in progress.

    Science.gov (United States)

    2010-04-01

    ... abate or control water or atmospheric pollution or contamination by removing, altering, disposing... oil or coal burners, soot blowers, bottom ash removal systems and concomitant air pollution control..., which facility would not be necessary if the plant continued to burn gas or oil. (4) Pollution control...

  17. Radioisotopic methods for quality control of works and studies while constructing foundations and underground structures

    International Nuclear Information System (INIS)

    Smorodinov, M.I.

    1980-01-01

    The data on the use of radioisotope methods of quality control of various kinds of construction works when building foundations and underground constructions and when carrying out scientific research, are presented. Devices and equipment are described, their block diagrams are presented. The experience in using radioisotope devices to control the quality of construction works, is presented. The problems of economic effectivenes of works using radioisotope devices are solved

  18. Joyo progress report, vol. 8

    International Nuclear Information System (INIS)

    1983-01-01

    Following Joyo Reactor Technology Progress Reports (Vol. 1 to Vol. 7), the name was changed to Joyo Progress Report from this volume, and the activities concerning the fast breeder experimental reactor Joyo as a whole are to be reported as quarterly report. In the fast breeder experimental reactor Joyo, the change to the core for irradiation (MK-2) from the core for breeding (MK-1) was carried out since January, 1982, in order to utilize the reactor as an irradiation facility for the development of fuel and materials. The main work was the construction of the core for irradiation by exchanging 290 fuel elements, and the exchange of upper and lower guide pipes for control rods, the reconstruction of the driving mechanism, the installation of standby neutron detector system, the acceptance and inspection of new fuel, and the transfer of spent fuel between pools were carried out. As scheduled, the core for irradiation attained the initial criticality on November 22, and the works of constructing the core were completed on December 23, 1982. Thereafter, the 100 MW performance test was begun. Various experience and valuable data were obtained in the regular inspection and the maintenance and repair works carried out at the same time, regarding the operation and maintenance of the Joyo facilities. (Kako, I.)

  19. Yemen watched from cement plant construction work. Cement plant koji wo toshite mita Yemen

    Energy Technology Data Exchange (ETDEWEB)

    Furuta, M [Kajima Corp., Tokyo (Japan)

    1993-06-25

    Construction of a cement plant was planned at southern part of Yemen. This is a cement plant with annual production 500,000 tons. The term of work was from January, 1990 to February, 1993. The present paper describes an outline the construction of this Cement Plant, the nationality and living environment in Yemen, and construction equipment which was used. The construction work consisted of 113,000m[sup 3] of digging, 82,000m[sup 3] of backfilling, 66,100m[sup 3] of concreting, and 29,285m[sup 3] of asphalt pavement. Reinforcing steel weighing 6,400 tons and steel frame weighing 3,600 tons were totally used. Equipment weighing 7,912 tons and electric devices weighing 1,299 tons were totally installed. For this construction work, two crawler cranes, six hydraulic cranes, aggregate plant, concrete mixers, and construction equipment, such as bulldozers, shovels, and dumpers, were brought from Japan. 5 figs.

  20. Causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait

    OpenAIRE

    Naser S. Almutairi

    2016-01-01

    This paper presents an investigation into analysis of the causes of delays on Construction Projects in Kuwait according to opinion of engineers working in Kuwait. This is achieved through identification of the major causes of delays in the construction industry as reported in literature and using a questionnaire survey to collect the views of the various key players in the Kuwaiti construction industry. The data is analyzed and the views of the groups surveyed discussed and the relative impor...

  1. Letting the Drama into Group Work: Using Conflict Constructively in Performing Arts Group Practice

    Science.gov (United States)

    Crossley, Tracy

    2006-01-01

    The article examines conflict avoidance in performing arts group work and issues arising in relation to teaching and learning. In group theory, conflict is addressed largely in terms of its detrimental effects on group work, and its constructive potential is often marginalized. Similarly, undergraduate students usually interpret "effective…

  2. Epidemiology of work-related injuries among construction workers of ilam (Western iran) during 2006 - 2009.

    Science.gov (United States)

    Moradinazar, Mehdi; Kurd, Nematullah; Farhadi, Rozita; Amee, Vahid; Najafi, Farid

    2013-10-01

    Work-related injuries are the most important cause of work absence, disability, retirement, mutilation, and even mortality. In Iran a great number of work-related injuries are occurred in construction industry. However, less than 12% of total workers are active in the construction sector. This study aimed to determine the incidence rate of work-related injuries, the type of injuries, and its other determinants among the construction workers of Ilam (Iran). The participants were the workers and staffs working in the construction activities of Ilam in Western Iran. All the recorded injuries and deaths related to the construction workers of Ilam from 2006-2009 were collected from the Bureau of Labor and Social Affairs and then analyzed by the statistical package of SPSS (version 19, for Windows). During 2006 - 2009 in Ilam, 387workers encountered the building accidents. Their mean age was 34.3 years (SD = 12.4). The average annual incidence of work-related injuries among the workers was 8.2 per 1000 workers. Fracture with 275 cases (71%) was the most common outcome of injuries, and slipping and falling with 77 cases (36%) were the most important events and exposures. The most important factor related to injuries was the lack of surveillance by employers which was also related with the severity of accident-induced injuries (P constructive workers.

  3. Organizing the engineering basis of works during NPP construction

    International Nuclear Information System (INIS)

    Gorodinskij, Yu.Kh.; Finberg, L.K.; Shapiro, V.I.

    1988-01-01

    Experience in organization of the system of engineering basis of works during the Khmelnitskij NPP construction, aimed at providing the applicability of the software complex realized with a computer when solving the problems arising before the service of engineering basis of works, is described. Calculational complex for solving the problems on the engineering basis of works includes the SM-2420 processor, immediate access and external storages on MD with capacity not less than 1 and 60 Mbit correspondignly, terminal multiplexer, VTA 2000-15 video terminals, not less than 10 pieces of videotons and not less than two SM-6315 alphanumerical printers

  4. A Computer Knowledge Database of accidents at work in the construction industry

    Science.gov (United States)

    Hoła, B.; Szóstak, M.

    2017-10-01

    At least 60,000 fatal accidents at work occur on building sites all over the world each year, which means that on average, every 10 minutes an employee dies during the execution of work. In 2015 on Polish building sites, 5,776 accidents at work happened, of which 69 resulted in the death of an employee. Accidents are an enormous social and economic burden for companies, communities and countries. The vast majority of accidents at work can be prevented by appropriate and effective preventive measures. Therefore, the Computer Knowledge Database (CKD) was formulated for this purpose and it enables data and information on accidents at work in the construction industry to be collected and processed in order to obtain necessary knowledge. This gained knowledge will be the basis to form conclusions of a preventive nature

  5. Construction Progress and Science Planning for the New Research Vessel R/V Sikuliaq

    Science.gov (United States)

    Whitledge, T. E.

    2011-12-01

    The research vessel R/V Sikuliaq (pronounced [see-KOO-lee-auk]) is currently being constructed on behalf of the NSF to support future scientific studies in high latitude waters. The 261 foot global class vessel will be capable of breaking 2.5 foot thick ice at 2 knots with an endurance of 45 days at sea and cruising at 11 knots. The R/V Sikuliaq will have a beam of 52 feet and a draft of 18.9 feet that will carry 26 scientists and a crew of 20. Berthing accommodations are a combination of single/double rooms with one stateroom and the common areas of the vessel are designed for ADA access and accommodations. The total laboratory space (main, analytical, electronics, wet, upper, and Baltic room will be 2100 square feet. The 4360 square foot working deck that is approximately 70 feet in length will accommodate 2-4 vans and multiple science operations. The vessel design strives to have the lowest possible environmental impact, including a low underwater-radiated noise signature. The science systems are prescribed to be state-of-the-art for bottom mapping, over-the-side "hands free" gear handling, broad band communications and scientific walk-in freezer and environmental chamber. More details and photos of the construction progress are available on the website at www.sfos.uaf.edu/arrv. The tentative shipyard schedule has a launch date of June 2012 and delivery to the University of Alaska Fairbanks in June 2013. Scientific operations following trials and testing is planned to start in January 2014. A Sikuliaq science planning workshop has been arranged for 18-19 February 2012 in Salt Lake City, UT just prior to the 2012 Ocean Sciences meeting. Interested participants should contact Terry Whitledge (terry@ims.uaf.edu).

  6. A generic approach does not work : Disciplinary differences as explanation for study progress in higher professional education

    NARCIS (Netherlands)

    Kamphorst, J. C.; Hofman, W. H. A.; Jansen, E. P. W. A.; Terlouw, C.

    2012-01-01

    A generic approach does not work. Disciplinary differences as explanation for study progress in higher professional education. We combine concepts of Tinto's theory on student departure and Becher's theory on disciplinary tribes for explaining study progress in universities. We collected data with

  7. [Strategic thinking of the construction of national schistosomiasis laboratory network in China].

    Science.gov (United States)

    Qin, Zhi-Qiang; Xu, Jing; Feng, Ting; Zhu, Hong-Qing; Li, Shi-Zhu; Xiao, Ning; Zhou, Xiao-Nong

    2013-08-01

    A schistosomiasis laboratory network and its quality assurance system have been built and will be more and more perfect in China. This paper introduces the present situation of schistosomiasis diagnosis in China and expounds the basic ideas and the progress in the construction of schistosomiasis network platform. Furthermore, the face of schistosomiasis diagnosis network platform construction and operation of the challenge and the future work will be put forward in the latter part of this paper.

  8. Projected Motorway Construction in the Central and North-Western Regions of Romania between 2013-2021

    Directory of Open Access Journals (Sweden)

    Istvan Csutak

    2013-10-01

    Full Text Available Romania’s highways and expressways are standing ahead of considerably high investments. The 21st Century has brought important breakthroughs in the building of highways and expressways. Our study focuses on the construction works that have been carried out in the Central and North-Western regions of Romania. The aim of this paper is presenting the two regions’ motorways as compared to the national average, determination of an approximate end date for the highways that are currently under construction, as well as a comparative study of the works planned to be carried out between 2013-2021 as compared to the ones planned between the years 2004-2012. It was proven that highways in these two regions have been built using mainly state funds, thus these works are progressing slowly due to lack of consistent funding. The results of this study also relate to how fast the construction works will be finished on parts where construction has already begun, as well as whether construction works will be conducted in a higher pace than the ones between 2004 and 2012.

  9. Earthquake countermeasure work on water intake structure based on post-construction shear reinforcement method

    International Nuclear Information System (INIS)

    Satou, Yoshihito; Wani, Masaaki; Wachi, Takamitsu

    2017-01-01

    Hamaoka Nuclear Power Station set up 'earthquake motion as the base for remodeling work' by referring to the strong earthquake fault model assumed by the 'Study meeting for Nankai Trough's mega thrust earthquake model' of the Cabinet Office. Based on this earthquake, it implemented seismic countermeasure work using ceramic fixing type post-construction shear reinforcement bars by targeting the Unit 4 water intake tank screen room. This construction work was carried out in a short period of about nine months due to a restriction in the drainage period of the water intake tank. Thanks to the improvement of process control, such as adoption of a two-shift (day and night) system, this work was completed. On the other hand, the quality of construction was secured by adopting a drilling machine with a resistance sensor at the time of drilling and plastic grout at the time of grout filling, as well as through quality inspection based on Construction Technology Review and Certification. (A.O.)

  10. Are demographics, work and health associated with the ability and motivation to continue working until the age of 65 in construction workers?

    NARCIS (Netherlands)

    Oude Hengel, K.; Blatter, B.; Geuskens, G.; Koppes, L.; Bongers, P.

    2011-01-01

    Objectives: Because of the ageing and decreasing working population in the construction industry, it is important to encourage workers to prolong their working life. The objective of this study was to explore factors associated with the ability and motivation to continue working until the age of 65

  11. Attention and working memory: two basic mechanisms for constructing temporal experiences

    OpenAIRE

    Marchetti, Giorgio

    2014-01-01

    Various kinds of observations show that the ability of human beings to both consciously relive past events – episodic memory – and conceive future events, entails an active process of construction. This construction process also underpins many other important aspects of conscious human life, such as perceptions, language, and conscious thinking. This article provides an explanation of what makes the constructive process possible and how it works. The process mainly relies on attentional activ...

  12. Accounting and analysis of the real labour input for objects and types of works during NPP construction

    International Nuclear Information System (INIS)

    Shuvaev, P.P.

    1983-01-01

    A technique for determining the actual labour input for PP construction according to types of works, construction units and objects is considered. The data are presented on specific expenditures on civil engineering, heat and electric installation, insulation and anticorrosion works for construction of the Chernobylsk and Kursk NPPs. A conclusion is drawn about the necessity of computer utilization in calculating the labour input for different types of works, number of workers and planning works during the NPP construction

  13. Predictive value and construct validity of the work functioning screener-healthcare (WFS-H)

    Science.gov (United States)

    Boezeman, Edwin J.; Nieuwenhuijsen, Karen; Sluiter, Judith K.

    2016-01-01

    Objectives: To test the predictive value and convergent construct validity of a 6-item work functioning screener (WFS-H). Methods: Healthcare workers (249 nurses) completed a questionnaire containing the work functioning screener (WFS-H) and a work functioning instrument (NWFQ) measuring the following: cognitive aspects of task execution and general incidents, avoidance behavior, conflicts and irritation with colleagues, impaired contact with patients and their family, and level of energy and motivation. Productivity and mental health were also measured. Negative and positive predictive values, AUC values, and sensitivity and specificity were calculated to examine the predictive value of the screener. Correlation analysis was used to examine the construct validity. Results: The screener had good predictive value, since the results showed that a negative screener score is a strong indicator of work functioning not hindered by mental health problems (negative predictive values: 94%-98%; positive predictive values: 21%-36%; AUC:.64-.82; sensitivity: 42%-76%; and specificity 85%-87%). The screener has good construct validity due to moderate, but significant (pvalue and good construct validity. Its score offers occupational health professionals a helpful preliminary insight into the work functioning of healthcare workers. PMID:27010085

  14. Predictive value and construct validity of the work functioning screener-healthcare (WFS-H).

    Science.gov (United States)

    Boezeman, Edwin J; Nieuwenhuijsen, Karen; Sluiter, Judith K

    2016-05-25

    To test the predictive value and convergent construct validity of a 6-item work functioning screener (WFS-H). Healthcare workers (249 nurses) completed a questionnaire containing the work functioning screener (WFS-H) and a work functioning instrument (NWFQ) measuring the following: cognitive aspects of task execution and general incidents, avoidance behavior, conflicts and irritation with colleagues, impaired contact with patients and their family, and level of energy and motivation. Productivity and mental health were also measured. Negative and positive predictive values, AUC values, and sensitivity and specificity were calculated to examine the predictive value of the screener. Correlation analysis was used to examine the construct validity. The screener had good predictive value, since the results showed that a negative screener score is a strong indicator of work functioning not hindered by mental health problems (negative predictive values: 94%-98%; positive predictive values: 21%-36%; AUC:.64-.82; sensitivity: 42%-76%; and specificity 85%-87%). The screener has good construct validity due to moderate, but significant (ppredictive value and good construct validity. Its score offers occupational health professionals a helpful preliminary insight into the work functioning of healthcare workers.

  15. Work Ideologies and Constructions of Disability in the Puerto Rican Context

    Directory of Open Access Journals (Sweden)

    Maribel Báez-Lebrón

    2015-01-01

    Full Text Available This paper summarizes a study conducted in 2012 with the purpose of analyzing work ideologies constructed by the media regarding subjectivity towards disability during the 2009 implementation of the Special Act Declaring a State of Fiscal Emergency to Save the Credit of Puerto Rico (Act No. 7.  Through a qualitative design and the manifest and latent content analysis techniques, and using the Disability and Human Subjectivity Models as the theoretical framework, a total of four hundred and sixty-seven (467 newspaper articles published between February and October 2009 was reviewed.  Results demonstrate that only fourteen articles (3%, which constitute the units of analysis, made reference, directly or indirectly, to disability.  The content of these articles is based on an ideology that excludes people with disabilities from social participation because they are considered incapable, unfit and worthless.  The disability and human subjectivity models that predominate are the socio-political and positional-existential ideology, respectively.  It was concluded that the work ideologies constructed by the media regarding subjectivity towards disability are used to exclude people with disabilities from the job market, without recognizing their power and ability of being and doing.

  16. Progression of hip dysplasia in 40 police working dogs: a retrospective study

    International Nuclear Information System (INIS)

    Zorko, B.; Ivanusa, T.; Pelc, R.

    2005-01-01

    The aim of the study was to evaluate the effects of progression of CHD and degenerative joint disease on a working capability of population of police working dogs. In the first part of the study, we reviewed the whole health documentation of all dogs and gathered all necessary radiographs of hip joints that were taken at first initial procurement. In the second part, clinical examination and radiographs of all dogs were taken 60 months after first examination and the progression of hip dysplasia was evaluated by the FCI scheme. All dogs were male, 35 German shepherds and 5 Rottweilers. The Norberg-Olsson angle in the first set of radiographs was 105.54 +/- 3.22 deg in 37 dogs without hip dysplasia and 100.17 +/- 2.99 deg in 3 dogs with initial mild dysplasia. In the second set of radiographs taken after 60 months of service the Norberg- Olsson angle was 105.60 +/- 3.67 deg in 23 dogs with no signs of hip dysplasia and 101.62 +/- 4.49 deg in 17 dogs with hip dysplasia. On the first set of radiographs, secondary degenerative changes were found in 3 dogs with initial mild dysplasia (7.5 %) and in 14 dogs (35 %) on second radiographs. The position of the centre of the femoral head on first radiographs was outside of dorsal acetabular rim in 25 (31.25 %) of estimated hip joints (n = 80); at the level of the rim in 30 (37.5 %) and inside in 25 (31.25 %). On second radiographs it was outside in 41 (51.25 %); at the level of the rim in 26 (32.5 %); and inside in 13 (31.25 %) of estimated hip joints. The mean femoral angle of inclination for all 40 dogs was 132.50 +/- 4.39? deg . If it has occured, the increase in degree of hip dysplasia was generally more than one degree. In 57.5 % of cases hip dysplasia was not determined on second radiographs. All dogs with some degree of hip dysplasia were German shepherds, but only one of them had clinical symptoms connected to CHD. The progression of hip dysplasia did not correlate with work period of the dogs, and has no influence on

  17. Occupation and work-related ill-health in UK construction workers.

    Science.gov (United States)

    Stocks, S J; Turner, S; McNamee, R; Carder, M; Hussey, L; Agius, R M

    2011-09-01

    Construction workers are at increased risk of work-related ill-health (WRI) worldwide. To compare the incidence of medically reported WRI in occupations within the UK construction industry according to job title. We calculated standardized incidence rate ratios (SRRs) using WRI cases for individual job titles returned to The Health and Occupation Reporting network by clinical specialists and UK population denominators. We counted frequencies of reported causal exposures or tasks reported by clinical specialists, occupational physicians and general practitioners. We found significantly increased incidence of WRI compared with other workers in the same major Standard Occupational Classification, i.e. workers with similar levels of qualifications, training, skills and experience, for skin neoplasia in roofers (SRR 6.3; 95% CI: 3.1-13.1), painters and decorators (2.1; 95% CI: 1.2-3.6) and labourers in building and woodworking trades (labourers, 6.6; 95% CI: 3.2-13.2); contact dermatitis in metal workers (1.4; 95% CI: 1.1-1.7) and labourers (1.6; 95% CI: 1.1-2.3); asthma in welders (3.8; 95% CI: 2.8-5.0); musculoskeletal disorders in welders (1.7; 95% CI: 1.1-2.8), road construction operatives (6.1; 95% CI: 3.8-9.6) and labourers (2.5; 95% CI: 1.7-3.7); long latency respiratory disease (mesothelioma, pneumoconiosis, lung cancer, non-malignant pleural disease) in pipe fitters (4.5; 95% CI: 3.2-6.2), electrical workers (2.7; 95% CI: 2.4-3.2), plumbing and heating engineers (2.3; 95% CI: 1.9-2.7), carpenters and joiners (2.7; 95% CI: 2.3-3.1), scaffolders (12; 95% CI: 8-18) and labourers (3.3; 95% CI: 2.6-4.1). UK construction industry workers have significantly increased risk of WRI. These data in individual construction occupations can be used to inform appropriate targeting of occupational health resources.

  18. 77 FR 49741 - Cranes and Derricks in Construction: Demolition and Underground Construction

    Science.gov (United States)

    2012-08-17

    ..., subpart CC, to replace the earlier rule (Sec. 1926.550) for all construction work.\\1\\ In proposing the new... derricks used in construction work. For most construction work, the final rule replaced a prior cranes and... construction work. Through this proposed rule, OSHA is proposing to apply the updated requirements to that work...

  19. 77 FR 49722 - Cranes and Derricks in Construction: Demolition and Underground Construction

    Science.gov (United States)

    2012-08-17

    ... underground construction work. Therefore, when OSHA promulgates a new final rule, states and territories with... used in construction work. For most construction work, the final rule replaced a prior cranes and... construction work. Through this direct final rule, OSHA is applying the updated requirements to that work. With...

  20. Work injury trends during the last three decades in the construction industry

    DEFF Research Database (Denmark)

    Lander, Flemming; Nielsen, Kent Jacob; Lauritsen, Jens M

    2016-01-01

    were calculated. Employment levels in the construction sector were used as an indicator of fluctuations in the business cycle since 1980. Results: Through the last three decades the overall trend of work-related injuries was unchanged. For some subgroups of injuries, such as major injuries and injuries...... were significantly related to the business cycle, where the risk of injuries was higher during economic booms than during recessions. Further, periods with economic booms are positively related to the rate of minor injuries and injuries due to all other work activities than the use of power tools...

  1. Interactive mechanism of working environments and construction behaviors with cognitive work analysis: an elevator installation case study.

    Science.gov (United States)

    Wang, Yanqing; Chong, Heap-Yih; Liao, Pin-Chao; Ren, Hantao

    2017-09-25

    Unsafe behavior is a leading factor in accidents, and the working environment significantly affects behaviors. However, few studies have focused on detailed mechanisms for addressing unsafe behaviors resulting from environmental constraints. This study aims to delineate these mechanisms using cognitive work analysis (CWA) for an elevator installation case study. Elevator installation was selected for study because it involves operations at heights: falls from heights remain a major cause of construction worker mortality. This study adopts a mixed research approach based on three research methodology stages. This research deconstructs the details of the working environment, the workers' decision-making processes, the strategies chosen given environmental conditions and the conceptual model for workers' behaviors, which jointly depict environment-behavior mechanisms at length. By applying CWA to the construction industry, environmental constraints can easily be identified, and targeted engineering suggestions can be generated.

  2. Rapid construction of concrete pressure vessels

    International Nuclear Information System (INIS)

    Limbert, D.; Weatherseed, D.C.

    1989-01-01

    This paper opens with a general description of the concrete pressure vessel followed by a more detailed examination of the critical elements of the construction, including choice of methods and plant which were selected to ensure its rapid construction. The pressure vessel construction cannot be treated in isolation, because it is very closely linked with its surrounding structures - namely the reactor hall which surrounds it and the charge hall which tops it, as will be seen in the context of this paper. Rate of progress of construction is not entirely in the civil contractor's hands because so many of the operations affecting the civil works are of a mechanical nature, hence a very close liaison and understanding amongst all contractors concerned was of the utmost importance. (author)

  3. Transparency in the Assessment of Takaful Claims for Construction Works Loss & Damage

    Directory of Open Access Journals (Sweden)

    Puteri Nur Farah Naadia Mohd Fauzi

    2016-06-01

    Full Text Available In the context of the construction industry, an alternative to the conventional insurance for works contracts is the Shariah compliant insurance otherwise known as takaful. Among the most frequently used takaful for construction works contracts is the Contractor’s All Risks (CAR Takaful. However, the future of CAR Takaful may be affected should issues such as marketing and clarification on how it works including how claims are processed, valued and compensation made are not made know to Contractors and Clients. In fact, previous studies have identified that issues on transparency in CAR Takaful products is among the major concerns expressed by the Contractors and Clients. Consequently, a study was conducted, the key objectives being to establish understanding on the concept of transparency in CAR Takaful claims and assess, from the perspectives of the Contractors and Clients, on whether the dealings in CAR Takaful claims are considered transparent or otherwise. The study was conducted principally via desk research and interviews with representative from takaful operators, Contractors and Clients organizations. Key results from the study suggest that transparency in CAR Takaful dealings is a concern especially those related to compliance with the Shariah and manner in which claims are valued and compensation decided. Such lack of transparency, if not addressed soonest possible, may not augur well for the future of the CAR Takaful industry.

  4. JET Project: progress in construction and management

    International Nuclear Information System (INIS)

    Bertolini, E.

    1978-01-01

    The JET Project of the European Community aims to construct and operate one of the largest Tokamak Devices foreseen at present in the field of Fusion Research. The aim of the experiment is to produce and study plasma conditions approaching those needed in a thermonuclear reactor and therefore will involve operation with deuterium--tritium gas

  5. Operational Work System Design and Staff Performance in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Emmanuel Ejikeme Isichei

    2017-03-01

    Full Text Available Objective: The study investigated the impact of operational work system design on staff performance in selected construction firms in Nigeria. Research Design & Methods: The study used primary data gathered with the use of a 5-point Likert scale questionnaire format administered to 138 respondents. A hypothesis was postulated to test the significance of the research problem. Data analysis was carried out using correlation and multiple regression analysis which proved the significance of the alternative hypothesis as a result of testing the hypothesis. Findings: The findings show that there is a significant relationship between operational work system design and staff performance. The study concludes that operational job design can be advanced as a motivation tool, which is non-monetary in nature, to improve staff performance. Implications & Recommendations: A key drive to improve performance is the satisfaction of staff coupled with an outstanding operational job design which takes into consideration the total physical and mental well-being of staff and its interaction with other organisational factors. The study recommends, among others, that there should be active participation of staff in the design of work in the organisation. Contribution & Value Added: The study provides an empirical approach to enhancing performance in the construction industry and thereby developing an indigenous firm to compete favourably on a growing market.

  6. 3D Printing of Tissue Engineered Constructs for in vitro Modeling of Disease Progression and Drug Screening

    Science.gov (United States)

    Vanderburgh, Joseph; Sterling, Julie A.

    2016-01-01

    2D cell culture and preclinical animal models have traditionally been implemented for investigating the underlying cellular mechanisms of human disease progression. However, the increasing significance of 3D versus 2D cell culture has initiated a new era in cell culture research in which 3D in vitro models are emerging as a bridge between traditional 2D cell culture and in vivo animal models. Additive manufacturing (AM, also known as 3D printing), defined as the layer-by-layer fabrication of parts directed by digital information from a 3D computer-aided design (CAD) file, offers the advantages of simultaneous rapid prototyping and biofunctionalization as well as the precise placement of cells and extracellular matrix with high resolution. In this review, we highlight recent advances in 3D printing of tissue engineered constructs (TECs) that recapitulate the physical and cellular properties of the tissue microenvironment for investigating mechanisms of disease progression and for screening drugs. PMID:27169894

  7. Comprehensibility, manageability and meaningfulness at work: Construct validity of a scale measuring work-related sense of coherence

    Directory of Open Access Journals (Sweden)

    Katharina Vogt

    2013-09-01

    Research purpose: The aim of the present study was to investigate the factorial invariance and the construct validity of a scale that measures Work-SoC. Motivation for the study: It might be useful to specifically apply the concept of sense of coherence to the work context. Research design, approach and method: Statistical analysis was performed on crosssectional (n = 3412 and longitudinal (n = 1286 questionnaire data collected in eight medium to large Swiss companies from diverse economic sectors (four industrialproduction companies, one food-processing company, one public-administration service and two hospitals. The dataset therefore covers a broad range of different occupational groups. Main findings: Multiple-group analyses indicated that the scale’s factor structure remains invariant across different employee groups and across time. High values in job resources were related to high values in Work-SoC whereas high values in job demands were related to low values in Work-SoC. Furthermore, Work-SoC acted as a partial mediator between job resources and work engagement. Practical/managerial implications: It can be concluded that Work-SoC might serve as a practical screening instrument for assessing an employee’s perception of the potential health-promoting qualities of his or her current work situation. Contribution/value-add: The study advances both the salutogenic theory and the field of positive occupational health psychology by redefining sense of coherence as an interactional and context-specific construct that is useful for intervention research.

  8. The role of CERN in the large construction contracts for LHC civil works

    CERN Document Server

    D'Aça-Castel-Branco, P

    1998-01-01

    The contracts for the civil engineering construction of the LHC are based upon the standard FIDIC (Fédération Internationale des Ingénieurs Conseils) document entitled "Conditions of Contract for Works of Civil Engineering Construction". FIDIC is a reputable supra-national and world-wide Federation of Consulting Engineers focused on the definition and regulation of the role of many parties involved with the International Construction Industry. An overview of FIDIC's and other Organizations', such as the World Bank, standard documents is presented. The difference between standard Contract documents and standard Bidding documents is pointed out. In view of CERN's status as an intergovernmental Organization, the original FIDIC standard documents needed to be adapted. The modifications are identified and explained. A concise definition of the role of each party concerned by the LHC construction Contracts, i.e. the Contractor, the Engineer and the Client (CERN), is made. Finally, a brief cost-benefit analysis o...

  9. Innovative Method of Analysis of Actual Cost of Work in Progress

    Science.gov (United States)

    Fil, O.; Terentev, V.

    2017-11-01

    The article focuses on the basic theory and practical aspects of improving the strategic management in terms of enhancing the quality of a technological process: these aspects have been proven experimentally by their introduction in company operations. The authors have worked out some proposals aimed at selecting an optimal supplier for building companies as well as the algorithm for the analysis and optimization of a construction company basing on scientific and practical research and the experimental data obtained in the experiment

  10. Improving the making ready process - Exploring the preconditions to work tasks in construction

    DEFF Research Database (Denmark)

    Lindhard, Søren; Wandahl, Søren

    2012-01-01

    preconditions have been revealed. The seven first is basically corresponding to the ones presented by Koskela (1999), while the last two are new and extends the existing knowledge. The preconditions are as follows: 1) Construction design and management. 2) Components and materials are present. 3) Workers...... are present. 4) Equipment and machinery are present. 5) Sufficient space for conduction. 6) Previous activities must be completed. 7) Climate conditions must be in order. 8) Safe working conditions in relation to national “Health and Safety at Work Act ” have to be present, 9) Known working conditions. Often...... productivity....

  11. Construction and Validation of the Self-Conscious Emotions at Work Scale

    Directory of Open Access Journals (Sweden)

    Hans Groenvynck

    2011-11-01

    Full Text Available The present study reports on the construction and validation of a new assessment instrument for self-conscious emotions in the work context, namely the Self-Conscious Emotions at Work Scale (SCEWS. In eight typical self-conscious work scenarios respondents have to indicate their emotional reaction in terms of 20 appraisals, subjective experiences, and action tendencies that are relevant and representative for the domain of self-conscious emotions. In total 512 students and 467 working adults completed the SCEWS and reported the frequency of positive emotions, anger, anxiety and sadness. In both samples a three-factorial structure emerged with a guilt, a shame/humiliation, and an anger in self-conscious situations factor. These three self-conscious emotion factors correlated differentially and in a predicted way with the frequency of emotions. Guilt-proneness was predicted to be psychologically constructive and correlated to the frequency of positive emotions. The proneness to shame/humiliation was expected to relate to internalising psychopathological tendencies, and positively correlated to a frequency of anxiety and sadness. Proneness to anger in self-conscious situations was expected to relate to externalising psychopathological tendencies and correlated with the frequency of anger in general. The present study demonstrates that self-conscious emotions can be validly measured in the work context. The new instrument allows for the systematic study of the role of self-conscious emotions in work and organisational behaviour.

  12. Reducing physical risk factors in construction work through a participatory intervention

    DEFF Research Database (Denmark)

    Ajslev, Jeppe; Brandt, Mikkel; Møller, Jeppe Lykke

    2016-01-01

    , video documentation of working tasks, and a 3-phased workshop program. METHODS: The evaluation is designed in an adapted process evaluation framework, addressing recruitment, reach, fidelity, satisfaction, intervention delivery, intervention received, and context of the intervention companies......: Intervention studies are challenging to conduct and evaluate in the construction industry, often because of narrow time frames and ever-changing contexts. The mixed-methods design presents opportunities for obtaining detailed knowledge of the practices intra-acting with the intervention, while offering...

  13. [Accidents at work in construction workers: a peculiar utilization of the information flow INAIL-ISPESL-Regions].

    Science.gov (United States)

    Madeo, G; Giaimo, M

    2007-01-01

    Indicators generally used to describe the work accident risk, i.e. frequency and injuries severity, are not suitable for comparison among single companies in order to point out those with major risk. We propose a method to draw out construction companies with higher risk of occupational injuries in the period 2003-2005 from INAIL-ISPESL-Regioni database. These companies will be object of specific interventions for the prevention, training and supervision from Prevention and Safety in Working Environments Services, from Provincial Labor Directions and Provincial Territorial Construction Committees.

  14. Association between perceived present working conditions and demands versus attitude to early retirement among construction workers.

    Science.gov (United States)

    Jebens, Einar; Medbø, Jon I; Knutsen, Oddvar; Mamen, Asgeir; Veiersted, Kaj Bo

    2014-01-01

    Early retirement is an increasing problem in the construction industry. There is limited information about causes leading employees to leave working life early. We have compared construction workers present situation with their perception of future demands at work to avoid early retirement. All 87 employees in a medium-sized Norwegian construction company participated in the study. All were men and answered questionnaires on health and pain, work ability, mechanical exposure, psychosocial conditions, and demands regarding future working conditions. Most workers showed good work ability, irrespective of age. Many reported high levels of mechanical exposure at work. The level of musculoskeletal pain was higher in the middle-aged (30-50 year old) age groups and seniors aged over 50 years than among the youngest workers less than 30 years of age. All workers reported that good health was important for continued working. Most workers stated that future work must not be too physically demanding. Many workers reported relatively low job satisfaction; consequently an interesting job was rated as important for continuing work. Good social conditions were a high priority. According to the examined construction workers, good health and reduced levels of mechanical exposure at work are essential to avoid early retirement.

  15. NCSX Construction Progress and Research Plans

    International Nuclear Information System (INIS)

    Neilson, G.H.; Heitzenroeder, P.; Lyon, J.; Nelson, B.; Reiersen, W.; Zarnstorff, M.

    2005-01-01

    Stellarators use 3D plasma and magnetic field shaping to produce a steady-state disruption-free magnetic confinement configuration. Compact stellarators have additional attractive properties, quasi-symmetric magnetic fields and low aspect ratio. The National Compact Stellarator Experiment (NCSX) is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in partnership with the Oak Ridge National Laboratory (ORNL) to test the physics of a high-beta compact stellarator with a low-ripple, tokamak-like magnetic configuration. The engineering challenges of NCSX stem from its complex geometry requirements. These issues are addressed in the construction project through manufacturing R and D and system engineering. As a result, the fabrication of the coil winding forms and vacuum vessel are proceeding in industry without significant technical issues, and preparations for winding the coils at PPPL are in place. Design integration, analysis, and dimensional control are functions provided by system engineering to ensure that the finished product will satisfy the physics requirements, especially accurate realization of the specified coil geometries. After completion of construction in 2009, a research program to test the expected physics benefits will start

  16. Design, construction, and validation of a scale to measure cyberbullying in a work environment

    Directory of Open Access Journals (Sweden)

    Luz N. Fernández-López

    2018-04-01

    Full Text Available The objective of this study was to design, construct, and validate a scale to measure cyberbullying in a work environment. The design used was quantitative, not experimental, and transversal. The research method was based on the Reactive Response Theory. This research produced a validated scale with a sample of the work environment in Puerto Rico. Three analyses were performed: content validity, reliability analysis of the Cronbach alpha coefficient, and the divergent type construct validity. Based on the analysis of the results, the scale was deemed to be useful for the purpose it was designed. Building a scale that measures cyberbullying contributes to the design of new instruments and the revision of existing ones; furthermore, it may serve as the basis for future re- search related to the topic of cyberbullying.

  17. Constructs of the Work/Life Interface and Their Importance to HRD

    Science.gov (United States)

    McMillan, Heather S.; Morris, Michael Lane; Atchley, E. Kate

    2008-01-01

    The purpose of this paper is to identify construct definitions and measurement tools for the work/life interface concepts: balance, conflict and facilitation. An understanding of these concepts is critical to HRD (human resource development) professionals because interventions designed to counter work/life interface issues can not be created, and…

  18. Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem

    2015-02-01

    Full Text Available This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects. Meanwhile, the research has determined the percentage of project items, in such a remote environment. Estimation equations suitable for remote areas have been formulated. Moreover, a procedure for unite price calculation is concluded.

  19. Reactor PIK construction

    International Nuclear Information System (INIS)

    Konoplev, Kir

    2003-01-01

    The construction work at the 100 MW researches reactor PIK in year 2002 was in progress. The main activity was concentrated on mechanical, ventilation and electrical equipment. Some systems and subsystems are under adjustment. Hydraulic driving gear for beam shutters are finished in installation, rinsing, and adjusting. Regulating rods test assembling was done. On the critical assembly the first reactor fueling was tested to evaluate the starting neutron source intensity and a sufficiency of existing control and instrument board. Mainline of the PIK facility design and neutron parameters are presented. (author)

  20. A Study of Work Based Learning For Construction Building Workers

    Science.gov (United States)

    Siregar, Syafiatun

    2018-03-01

    Work-based learning (WBL) is designed to improve the competence of participants. This study aims to apply the WBL and to develop attitudes, knowledge, skills, behaviors, and habits, which in turn can improve the competence of construction workers in the field to be sampled. This research was conducted on building construction workers in Medan City with 30 research subjects. The results showed that the evaluation of learning increased in phase I obtained the difference of the average score of 20.9 (the meeting I) and 25.50 (meeting II). The final result shows that the level of activity and competence increased significantly after WBL

  1. Estimating the value of public construction works in Poland and Czech Republic

    Directory of Open Access Journals (Sweden)

    Edyta Plebankiewicz

    2016-07-01

    Full Text Available The article outlines the legislation concerning the methodology of estimating the value of works in Poland and the Czech Republic. In both countries it is necessary for the public investor to respect the law governing public procurement, which defines the structure of compulsory documents needed for the tender documentation, but not directly the way of their preparation. In both countries, though, there exist model proceeding schedules for the calculation of the value of a public procurement for construction works. To illustrate and compare the calculation methods a sample calculation of the procurement value is presented for a selected thermal efficiency improvement project.

  2. Equality, diversity and career progression: Perceptions of radiographers working in the National Health Service

    International Nuclear Information System (INIS)

    Bogg, Jan; Hussain, Zainab

    2010-01-01

    This study evaluated radiographers' perceptions of equality, diversity and career progression in the National Health Service (NHS) by means of a quantitative national survey in which 120 radiographers responded. The findings were assessed in relation to the participants' own beliefs about equality and diversity. Key findings included that despite the fact that the NHS is actively attempting to address equality and diversity issues, radiographers working within the NHS still perceive that problems exist. This is apparent from the findings that 55% of participants thought that women generally experience some barriers to career progression. Sixty-seven percent perceived that people with disabilities experienced barriers to career progression and 49% felt that the profession did not reflect the community that it served. Reassuringly, policy and procedures are felt to be making a difference and worthwhile. In the light of the introduction of the Single Equality Scheme and Equality Impact Assessments, it is important that radiographer's perceptions of equality and diversity are evaluated and that incorrect beliefs are challenged.

  3. The concept of value stream mapping to reduce of work-time waste as applied the smart construction management

    Science.gov (United States)

    Elizar, Suripin, Wibowo, Mochamad Agung

    2017-11-01

    Delays in construction sites occur due to systematic additions of time waste in various activities that are part of the construction process. Work-time waste is non-adding value activity which used to differentiate between physical construction waste found on site and other waste which occurs during the construction process. The aim of this study is identification using the concept of Value Stream Mapping (VSM) to reduce of work-time waste as applied the smart construction management.VSM analysis is a method of business process improvement. The application of VSM began in the manufacturing community. The research method base on theoretically informed case study and literature review. The data have collected using questionnaire through personal interviews from 383 respondents on construction project in Indonesia. The results show that concept of VSM can identify causes of work-time waste. Base on result of questioners and quantitative approach analysis was obtained 29 variables that influence of work-time waste or non-value-adding activities. Base on three cases of construction project founded that average 14.88% of working time was classified as waste. Finally, the concept of VSM can recommend to identification of systematic for reveal current practices and opportunities for improvement towards global challenges. The concept of value stream mapping can help optimize to reduce work-time waste and improve quality standard of construction management. The concept is also can help manager to make a decision to reduce work-time waste so as to obtain of result in more efficient for performance and sustainable construction project.

  4. Economic-mathematical model of planning construction-installation work for automation in drilling

    Energy Technology Data Exchange (ETDEWEB)

    Tsay, L K

    1979-01-01

    The basis for increasing oil extraction is an increase in the volume of drilling operations which includes a set of work done by specialized enterprises, installation-adjustment administrations (IAA). Operational-calendar planning in the IAA still has many shortcomings. The main tasks of operational-calendar planning in the IAA can include distribution of work by facilities between specialized brigades and the formation of a schedule for shipping materials to the objects of the construction-installation operations. The basic criteria for optimization in operational-calendar planning are the maximum labor productivity, minimum duration of fulfillment of work, uniform consumption of resources, minimization of outlays for production of work. The second and the fourth criteria are inapplicable because of limited resources with directive periods of fulfilling the work. The first and third criterion mutually exclude each other. Since they are of equal value, it is suggested that the criterion be such an indicator as uniform consumption of resources. Then, by minimizing the degree of nonuniformity of consumption of the output of IAA contractors, one can determine the optimal uniform consumption of resources.

  5. Candidate soil indicators for monitoring the progress of constructed wetlands toward a natural state: a statistical approach

    Science.gov (United States)

    Stapanian, Martin A.; Adams, Jean V.; Fennessy, M. Siobhan; Mack, John; Micacchion, Mick

    2013-01-01

    A persistent question among ecologists and environmental managers is whether constructed wetlands are structurally or functionally equivalent to naturally occurring wetlands. We examined 19 variables collected from 10 constructed and nine natural emergent wetlands in Ohio, USA. Our primary objective was to identify candidate indicators of wetland class (natural or constructed), based on measurements of soil properties and an index of vegetation integrity, that can be used to track the progress of constructed wetlands toward a natural state. The method of nearest shrunken centroids was used to find a subset of variables that would serve as the best classifiers of wetland class, and error rate was calculated using a five-fold cross-validation procedure. The shrunken differences of percent total organic carbon (% TOC) and percent dry weight of the soil exhibited the greatest distances from the overall centroid. Classification based on these two variables yielded a misclassification rate of 11% based on cross-validation. Our results indicate that % TOC and percent dry weight can be used as candidate indicators of the status of emergent, constructed wetlands in Ohio and for assessing the performance of mitigation. The method of nearest shrunken centroids has excellent potential for further applications in ecology.

  6. Prefabrication in Building Construction: A Perspective of Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Nafees Ahmed Memon

    2014-07-01

    Full Text Available Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight method as a MCDM approach. The results depict that main advantages of prefabrication are ?Shorter construction time? and ?Less construction site waste?. The top hindrances in adopting prefabrication as identified in this study are: ?Higher initial construction cost? and ?Inflexible for design changes?. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan

  7. Prefabrication in building construction: a perspective of pakistan construction industry

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.; Khehro, S.H.

    2014-01-01

    Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight) method as a MCDM approach. The results depict that main advantages of prefabrication are Shorter construction time and Less construction site waste. The top hindrances in adopting prefabrication as identified in this study are: Higher initial construction cost and Inflexible for design changes. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan. (author)

  8. Cabling design of booster and storage ring construction progress of TPS

    International Nuclear Information System (INIS)

    Wong, Y.-S.; Liu, K.-B.; Liu, C.-Y.; Wang, B.-S.

    2017-01-01

    The 2012 Taiwan Photon Source (TPS) cable construction project started after 10 months to complete the cable laying and installation of power supply. The circumference of the booster ring (BR) is 496.8 m, whereas that of the storage ring (SR) is 518.4 m. Beam current is set to 500 mA at 3.3 GeV. The paper on grounding systems discusses the design of the ground wire (< 0.2 Ω) with low impedance, power supply of the accelerator and cabling tray. The flow and size of the ground current are carefully evaluated to avoid grounded current from flowing everywhere, which causes interference problems. In the design of the TPS, special shielding will be established to isolate the effects of electromagnetic interference on the magnet and ground current. Booster ring dipoles are connected by a series of 54-magnet bending dipole; the cable size of its stranded wire measures 250 mm"2, with a total length of 5000 m. Booster ring and storage ring quadrupoles have 150 magnets; the cable size of their stranded wire is 250 mm"2, with a total length of 17000 m. Storage ring dipole consists of 48 magnets; the cable size of its stranded wire is 325 mm"2, with a total length of 6000 m. This study discusses the power supply cabling design of the storage ring and booster ring construction progress of TPS. The sections of this paper are divided into discussions of the construction of the control and instrument area, cabling layout of booster ring and storage ring, as well as the installation and commission machine. This study also discusses the use of a high-impedance meter to determine the effect of cabling insulation and TPS power supply machine on energy transfer to ensure the use of safe and correct magnet.

  9. The complete practitioner: still a work in progress.

    Science.gov (United States)

    Barnett, Jeffrey E

    2009-11-01

    When one is reflecting on a career as a practitioner, a number of important influences, themes, and elements that contribute to being a successful practitioner are evident. The achievement of this success is not a solitary activity. Many role models and mentors serve as important influences and guides for developing as a professional over the course of one's career. Ultimately, the goal is to aspire to become a complete practitioner. This includes being a passionate professional, clinically competent, a psychotherapist and clinician, an active consumer of research findings, ethical, a role model, a mentor, psychologically healthy, an advocate, a leader, a volunteer, an educator, a scholar, a colleague, a business person and entrepreneur, and an innovator and visionary; focusing on diversity and multicultural competence; and having a comprehensive vision of health. Because the goal of being a complete practitioner is aspirational, one never fully masters each of these roles and attributes but remains a work in progress. Yet, the process of endeavoring to become a complete practitioner is rewarding, gratifying, and meaningful. It is a journey well worth taking. Copyright 2009 by the American Psychological Association

  10. Equality, diversity and career progression: Perceptions of radiographers working in the National Health Service

    Energy Technology Data Exchange (ETDEWEB)

    Bogg, Jan [School of Community and Population Sciences, University of Liverpool, Liverpool (United Kingdom); Hussain, Zainab, E-mail: zay@liv.ac.u [School of Health Sciences, Division of Medical Imaging and Radiotherapy, University of Liverpool, L69 3GB, Liverpool, Merseyside (United Kingdom)

    2010-11-15

    This study evaluated radiographers' perceptions of equality, diversity and career progression in the National Health Service (NHS) by means of a quantitative national survey in which 120 radiographers responded. The findings were assessed in relation to the participants' own beliefs about equality and diversity. Key findings included that despite the fact that the NHS is actively attempting to address equality and diversity issues, radiographers working within the NHS still perceive that problems exist. This is apparent from the findings that 55% of participants thought that women generally experience some barriers to career progression. Sixty-seven percent perceived that people with disabilities experienced barriers to career progression and 49% felt that the profession did not reflect the community that it served. Reassuringly, policy and procedures are felt to be making a difference and worthwhile. In the light of the introduction of the Single Equality Scheme and Equality Impact Assessments, it is important that radiographer's perceptions of equality and diversity are evaluated and that incorrect beliefs are challenged.

  11. [Diagnostics of work motivation (DIAMO): optimization and construct validity].

    Science.gov (United States)

    Ranft, Andreas; Fiedler, Rolf; Greitemann, Bernhard; Heuft, Gereon

    2009-01-01

    Faced with increasing cost pressure of the social insurance system the carriers of rehabilitation programs focus on the efficacy of their measures. The diagnostic instrument for work motivation (DIAMO) has been developed to assess the influence of job-related motivation on the rehabilitation outcome. The inner structure of the instrument was validated and optimized in a cohort of medical rehabilitation patients (n = 422). Construct validity was further tested by using established instruments. Ten scales related to self-image, intention of action and goodness of fit show good psychometric qualities (Cronbachs alpha: 0.72 - 0.86). The constructs correlate moderately-to-strongly with personality-oriented scales while correlation with disease-related contents is low. The DIAMO is a generic and not disease oriented instrument. It would be expected to facilitate the development of vocational interventions to increase the rehabilitation outcome.

  12. [Purveyors of technology: provincial engineers and the construction of road infrastructure in Minas Gerais].

    Science.gov (United States)

    Barbosa, Lidiany Silva

    2011-01-01

    The article analyzes the role played by engineers in the construction of road infrastructure in Minas Gerais between the 1840s and 1880s. Building and providing regular maintenance for roads and bridges was a task carried out by the Minas Gerais provincial government, which since the 1830s had a specific agency assigned to designing, building, and maintaining public communication routes. Engineers were part of the agency from its inception, playing a significant role in designing projects and in the actual execution of certain works. The current study is grounded in administrative documentation in which the details of work progress are reported to the provincial government. The gathered records provide technical, administrative, and financial information, along with data on labor power and the agents engaged in construction works.

  13. Key features and progress of the KSTAR tokamak engineering

    International Nuclear Information System (INIS)

    Bak, J.S.; Choi, C.H.; Oh, Y.K.

    2003-01-01

    Substantial progress of the KSTAR tokamak engineering has been made on major tokamak structures, superconducting magnets, in-vessel components, diagnostic system, heating system, and power supplies. The engineering design has been elaborated to the extent necessary to allow a realistic assessment of its feasibility, performance, and cost. The prototype fabrication has been carried out to establish the reliable fabrication technologies and to confirm the validation of analyses employed for the KSTAR design. The completion of experimental building with beneficial occupancy for machine assembly was accomplished in Sep. 2002. The construction of special utility such as cryo-plant, de-ionized water-cooling system, and main power station will begin upon completion of building construction. The commissioning, construction, fabrication, and assembly of the whole facility will be going on by the end of 2005. This paper describes the main design features and engineering progress of the KSTAR tokamak, and elaborates the work currently underway. (author)

  14. RCC-CW - Rules for design and construction of PWR nuclear civil works

    International Nuclear Information System (INIS)

    2016-01-01

    RCC-CW describes the rules for designing, building and testing civil engineering works in PWR reactors. It explains the principles and requirements for the safety, serviceability and durability of concrete and metal frame structures, based on Eurocode design principles (European standards for the structural design of construction works) combined with specific measures for safety-class buildings. The code is produced as part of the RCC-CW Subcommittee, which includes all the parties involved in civil engineering works in the nuclear sector: clients, contractors, general and specialized firms, consultancies and inspection offices. The code covers the following areas relating to the design and construction of civil engineering works that play an important safety role: geotechnical aspects, reinforced concrete structures and galleries, pre-stressed containments with metal liner, metal containment and pool liners, metal frames, anchors, concrete cylinder pipes, containment leak tests. The RCC-CW code is available as an ETC-C version specific to EPR projects (European pressurized reactor). Contents of the 2016 edition of the RCC-CW Code: Part G - General: scope, standards, notations, quality management, general principles; Part D - Design: actions and combinations of actions, geotechnical aspects, pre-stressed or reinforced concrete structures, metal containment liners, metal pool liners, metal frames, anchors; Part C - Construction: geotechnical aspects, concrete, surface finish and formwork, reinforcement for reinforced concrete, pre-stressing processes, prefabricated concrete elements, metal containment liners, metal pool liners, metal frames, anchors, embedded pipelines, joint sealing, survey networks and tolerances; Part M - Maintenance and monitoring: containment integrity and rate tests

  15. Work in progress on fatigue of welded structures in the Nordic countries

    DEFF Research Database (Denmark)

    Samuelsson, Jack; Haagensen, Per; Agerskov, Henning

    2006-01-01

    Close international cooperation has been an important characteristic of the research on fatigue of welded structures in the Nordic countries. Cooperative projects were initiated already in the mid-1980's and have continued for nearly 20 years. This report is by no means exhaustive of all the work...... Welded Structures, which is partially funded by the Nordic Innovation Centre and numerous national funding agencies. The project has 10 industry companies, 5 universities and one research centre as partners....... on fatigue of welded structures progressing in this region, but it does provide a cross-section of those activities that has been brought to the attention of the national societies. Several of the issues reported here represent sub-tasks within the project Q-FAB: Quality and Cost of Fabricated Advanced......Close international cooperation has been an important characteristic of the research on fatigue of welded structures in the Nordic countries. Cooperative projects were initiated already in the mid-1980's and have continued for nearly 20 years. This report is by no means exhaustive of all the work...

  16. Optimal Scheduling of Railway Track Possessions in Large-Scale Projects with Multiple Construction Works

    DEFF Research Database (Denmark)

    Li, Rui; Roberti, Roberto

    2017-01-01

    satisfying different operational constraints and minimizing the total construction cost. To find an optimal solution of the RTPSP, this paper proposes an approach that, first, transfers the nominal market prices into track-possession-based real prices, and then generates a schedule of the construction works...... by solving a mixed-integer linear-programming model for the given track blocking proposal. The proposed approach is tested on a real-life case study from the Danish railway infrastructure manager. The results show that, in 2 h of computing time, the approach is able to provide solutions that are within 0...

  17. Health Promotion at the Construction Work Site: The Lunch Truck Pilot Study.

    Science.gov (United States)

    Caban-Martinez, Alberto J; Moore, Kevin J; Clarke, Tainya C; Davila, Evelyn P; Clark, John D; Lee, David J; Fleming, Lora E

    2018-04-01

    The transient nature of construction work makes it difficult to conduct longitudinal worksite-based health promotion activities. As part of a workplace health assessment pilot study, we worked with a commercial lunch truck company to disseminate four types of health education materials including cancer screening, workplace injury prevention, fruit and vegetable consumption, and smoking cessation to construction workers purchasing food items from the truck during their job breaks. Two weeks following the worksite assessment, we followed up with these workers to ascertain their use of the health promotion materials. Of the 54 workers surveyed, 83% reported reviewing and sharing the cancer screening materials with their families, whereas 44% discussed the cancer screening materials with coworkers. Similar proportions of workers reviewed, shared, and discussed the other health promotion materials with their family. Lunch trucks may be an effective strategy and delivery method for educating construction workers on healthy behaviors and injury prevention practices.

  18. Evaluation of a real-time travel time prediction system in a freeway construction work zone : executive summary.

    Science.gov (United States)

    2001-03-01

    A real-time travel time prediction system (TIPS) was evaluated in a construction work : zone. TIPS includes changeable message signs (CMSs) displaying the travel time and : distance to the end of the work zone to motorists. The travel times displayed...

  19. 48 CFR 227.7107-2 - Contracts for construction supplies and research and development work.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Contracts for construction supplies and research and development work. 227.7107-2 Section 227.7107-2 Federal Acquisition Regulations... PATENTS, DATA, AND COPYRIGHTS Rights in Technical Data 227.7107-2 Contracts for construction supplies and...

  20. Towards Legitimate Nursing Work? Historical Discursive Constructions of Abortion in The Canadian Nurse, 1950-1965.

    Science.gov (United States)

    Haney, Catherine

    2014-01-01

    To the detriment of women's health, the abortion work of nurses in Canada has gone largely unexamined and is not well understood. This historical discourse analysis examines discursive constructions of nurses' abortion work and ongoing renegotiations of professional identity in The Canadian Nurse from 1950 to 1965. By investigating what has shaped and continues to inform nurses' understandings and enactment of abortion work over time, I hope to contribute to a foundation from which to evaluate contemporary abortion services and to foster conditions that support nurses in providing safe abortion care.

  1. A Framework For A Decision Support Model For Supply Chain Management In The Construction Industry

    OpenAIRE

    Perdomo-Rivera, Jose Luis

    2004-01-01

    Materials are one of the areas that require special attention while creating a project's master plan as well as during the daily construction progress. The absence of materials when needed is one of the main causes of loss of productivity at a jobsite. Inefficient materials management can lead to an increase of 50% in work hours. As a result, a detailed plan for the materials management of each construction project is necessary. The critical role of materials management in the su...

  2. Prevalence, source and severity of work-related injuries among "foreign" construction workers in a large Malaysian organisation: a cross-sectional study.

    Science.gov (United States)

    Zerguine, Haroun; Tamrin, Shamsul Bahri Mohd; Jalaludin, Juliana

    2018-02-02

    Malaysian construction sector is regarded as critical in the field of health because of the high rates of accidents and fatalities. This research aimed to determine the prevalence, sources and severity of injuries and its association with commitment to safety among foreign construction workers. A cross-sectional study was conducted among 323 foreign construction workers from six construction projects of a large organization in Malaysia, using a simple random sampling method. Data was collected using a structured questionnaire to assess work-related injuries and safety commitment. The collected data was analysed by SPSS 22.0 using descriptive statistics and chi-square test. The prevalence of work-related injuries in a one year period was 22.6%, where most of the injuries were of moderate severity (39.7%) and falls from heights represented the main source (31.5%). The majority of the foreign construction workers had perceived between moderate and high safety commitment, which was significantly associated with work-related injuries. The results also showed a significant association of work-related injuries with the company\\'s interest in Safety and Health, Safety and Health training, and safety equipment. Thus, the implementation of new procedures and providing relevant trainings and safety equipment; will lead to a decrease in injury rates in construction sites.

  3. Women in the Construction Industry in the U.K.: a Cultural Discord?

    Science.gov (United States)

    Bagilhole, Barbara M.; Dainty, Andrew R. J.; Neale, Richard H.

    The construction industry is the most male dominated of all industrial sectors in the United Kingdom. This article reports on a study that explored women's and men's experiences of working in the industry, focusing on how the cultural aspects of the workplace environment impinged upon women's career development. We interviewed more than 80 male and female construction professionals from large construction organizations, and compared their career accounts in order to establish the aspects of the workplace culture that had a gender-differentiated impact on progression. We found that construction organizations formed competitive "power" cultures where women's contributions were marginalized and their careers impeded through a combination of inflexible work practices and discriminatory behavior. These barriers to women's careers were maintained in small project teams by autonomous male operational managers. Their locus of control embraced recruitment, promotion, and staff development, which allowed them to sustain a workplace culture intolerant of nontraditional entrants. We conclude that this cultural environment is likely to remain problematic for women unless it can be changed in a way that values their contribution. This requires a radical shift in middle management attitudes, a departure from current organizational human resource management systems, and a wider acceptance of the need for cultural change within the industry.

  4. Construct Validation of the Translated Version of the Work-Family Conflict Scale for Use in Korea

    Science.gov (United States)

    Lim, Doo Hun; Morris, Michael Lane; McMillan, Heather S.

    2011-01-01

    Recently, the stress of work-family conflict has been a critical workplace issue for Asian countries, especially within those cultures experiencing rapid economic development. Our research purpose is to translate and establish construct validity of a Korean-language version of the Multi-Dimensional Work-Family Conflict (WFC) scale used in the U.S.…

  5. Spatial distributions of niche-constructing populations

    Directory of Open Access Journals (Sweden)

    Xiaozhuo Han

    2015-12-01

    Full Text Available Niche construction theory regards organisms not only as the object of natural selection but also an active subject that can change their own selective pressure through eco-evolutionary feedbacks. Through reviewing the existing works on the theoretical models of niche construction, here we present the progress made on how niche construction influences genetic structure of spatially structured populations and the spatial-temporal dynamics of metapopulations, with special focuses on mathematical models and simulation methods. The majority of results confirmed that niche construction can significantly alter the evolutionary trajectories of structured populations. Organism-environmental interactions induced by niche construction can have profound influence on the dynamics, competition and diversity of metapopulations. It can affect fine-scale spatially distribution of species and spatial heterogeneity of the environment. We further propose a few research directions with potentials, such as applying adaptive dynamics or spatial game theory to explore the effect of niche construction on phenotypic evolution and diversification.

  6. Integrated risk management for improving internal traffic control, work-zone safety, and mobility during major construction : tech transfer summary.

    Science.gov (United States)

    2012-10-01

    Construction work zones are among the most dangerous places to work in any industry in the world. This is because many factors in construction, such as constant change in working environments and driver errors, contribute to a workplace with a higher...

  7. Construction quality assurance program plan for the WIPP project, Carlsbad, NM

    International Nuclear Information System (INIS)

    1987-05-01

    The purpose of this plan is to describe the Quality Assurance (QA) Program to be established and implemented by the US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP) Project Office (WPO) and by the Major Project Participants: the Architect-Engineer (Bechtel), the Construction Manager (US Army Corps of Engineers), the Scientific Advisor (Sandia National Laboratory), and the Management and Operating Contractor (Westinghouse Electric Corporation). This plan addresses the construction, including site evaluation, design, and turnover phases of WIPP. Other work in progress during the same period is controlled by DOE documents applicable to that work effort. The prime responsibility for ensuring the quality of construction rests with the DOE WIPP Project Office and is implemented through the combined efforts of the Construction Manager, the Construction Contractors, the Management and Operating Contractor, and the Architect-Engineer. Inspection and burden of proof of acceptability rests with the Construction Contractor as defined by the technical provisions of the contract and as otherwise specified by the DOE WIPP Project Office on an individual work-package basis. To the maximum extent possible, acceptance of work will be based upon first-hand witnessing by the Construction Manager and other representatives of the DOE organization

  8. Sustainable Construction Supply Chains through Synchronized Production Planning and Control in Engineer-to-Order Enterprises

    Directory of Open Access Journals (Sweden)

    Patrick Dallasega

    2017-10-01

    Full Text Available Sustainability in the supply chain is becoming more and more important for industrial enterprises in different sectors. This research article focuses on construction supply chains (CSCs in the Engineer-to-Order (ETO industry, where every product is almost unique based on specific customer needs and requirements. The development of methods and approaches for more sustainable supply chain management in construction is becoming even more important. Engineering, fabrication of parts and their installation on-site are not always well synchronized in ETO supply chains. The results of such supply chains are long lead times, inefficient material transport and high and uncontrolled levels of work-in-progress (WIP. This article describes a conceptual approach to synchronize demand on-site with supply in manufacturing using the CONstant Work In Progress (ConWIP concept from Lean Management to achieve Just-in-Time (JIT supply. As a result, sustainable supply chains in ETO enterprises, with optimizations from an economic, ecological and social point of view, can be designed. The approach has been validated in an industrial case study.

  9. Progress and status of neutron radiography and gauging in Europe

    International Nuclear Information System (INIS)

    Balasko, Marton

    1996-01-01

    European neutron radiography (NR) stations, applications and main trends of progress are surveyed. NR laboratories installed at research reactors operating in eight countries. DIANE transportable neutron source has been constructed within the framework of EURECA project. High resolution film techniques and video imaging are used in various applications. In several cases NR is combined with other non-destructive methods. The European Neutron Radiography Working Group organizes annual meetings and international projects (COST, INCO Copernicus) to promote personal contacts and scientific cooperation in this field. (author)

  10. Initial evaluation of psychometric properties of a structured work task application for the Assessment of Work Performance in a constructed environment.

    Science.gov (United States)

    Karlsson, Elin A; Liedberg, Gunilla M; Sandqvist, Jan L

    2017-06-22

    The Swedish Social Insurance Administration has developed a new assessment tool for sickness insurance. This study is a part of the initial evaluation of the application, called the Assessment of Work Performance, Structured Activities, and focuses on evaluation of the psychometric properties of social validity, content validity, and utility. This was a qualitative study using semi-structured telephone interviews with occupational therapists. A convenience sample was used and participants who fulfilled inclusion criteria (n = 15) were interviewed. Data were analyzed using content analysis with a directed approach. The results indicate that the application provides valuable information and that it is socially valid. Assessors found work tasks suitable for a diverse group of clients and reported that clients accepted the assessments. Improvements were suggested, for example, expanding the application with more work tasks. The instrument has benefits; however, further development is desired. The use of a constructed environment in assessments may be a necessary option to supplement a real environment. But depending on organizational factors such as time and other resources, the participants had different opportunities to do so. Further evaluations regarding ecological validity are essential to ensure that assessments are fair and realistic when using constructed environments. Implications for rehabilitation This study indicates that assessment in a constructed environment can provide a secure and protected context for clients being assessed. Psychometric evaluations are a never-ending process and this assessment instrument needs further development. However, this initial evaluation provides guidance in development of the instrument but also what studies to give priority to. It is important to evaluate social validity in order to ensure that clients and assessors perceive assessment methods fair and meaningful. In this study, participants found the work tasks

  11. Skilled labour supply in the South African construction industry: The nexus between certification, quality of work output and shortages

    Directory of Open Access Journals (Sweden)

    Abimbola O. Windapo

    2016-06-01

    Full Text Available Orientation: Construction human resource management. Research purpose: The study examines the skilled labour supply in the South African construction industry and determines whether there is a relationship between trade certification, quality of work output and scarce labour skills. Motivation for the study: The rationale for the investigation is based on the view of scholars that a skilled labour shortage is preponderant in the South African construction industry even though there is a high level of youth unemployment in South Africa and that the perceived skills shortage contributes to a decrease in productivity and product quality. Research design, approach and method: The paper reviews relevant literature and employs a mixed method research approach in collecting empirical data from contracting companies within the Western Cape Province of South Africa that are listed on the Construction Industry Development Board contractor register. Main findings: The study demonstrated that there is no shortage of manpower, but there is a shortage of qualified or skilled tradesmen, such as electricians, plumbers, welders, fitters and carpenters, whose professions are more technical and require formal training and certification. The level of supply of skilled tradesmen is attributed to the lack of high-quality basic education, the state of the economy, compulsory certification of tradesmen and an ageing workforce. It was also found that there is a significant relationship between skilled labour shortages and the requirement that labour be certified and that work output is unsatisfactory when there is no certification requirement. Practical/managerial implications: Based on these findings, the study concludes that skilled labour shortages and poor work output quality continue to be experienced in the South African construction industry when workers are unable to obtain formal certification for informal work experience acquired through years of practice on

  12. FY 1992 work plan and technical progress reports

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-11-01

    The Desert Research Institute (DRI) is a division of the University of Nevada System devoted to multidisciplinary scientific research. For more than 25 years, DRI has conducted research for the US Department of Energy`s Nevada Field Office (DOE/NV) in support of operations at the Nevada Test Site (NTS). During that time, the research program has grown from an early focus on hydrologic studies to include the areas of geology, archaeology, environmental compliance and monitoring, statistics, database management, public education, and community relations. The range of DRI`s activities has also expanded to include a considerable amount of management and administrative support in addition to scientific investigations. DRI`s work plan for FY 1992 reflects a changing emphasis in DOE/NV activities from nuclear weapons testing to environmental restoration and monitoring. Most of the environmental projects from FY 1991 are continuing, and several new projects have been added to the Environmental Compliance Program. The Office of Technology Development Program, created during FY 1991, also includes a number of environmental projects. This document contains the FY 1992 work plan and quarterly technical progress reports for each DRI project.

  13. Quality assurance during construction and mounting of the Balakovo NPP

    International Nuclear Information System (INIS)

    Savkin, A.I.; Vorob'ev, N.G.; Kugrysheva, M.A.

    1984-01-01

    Measures directed at opportune comissioning of the first unit of Balakovo NPP with the caracity 1000 MW(el.) are briefly described. A high quality of construction and mounting works is achieved due to a high level of engeneering preparation in the industry, organization of daily control over the works implementation and quality of products and materials supplied, by the improvement of automation and introduction of progressive forms of organization and remuneration

  14. Human Resource Construction

    Institute of Scientific and Technical Information of China (English)

    2015-01-01

    Centering on strategic objective of reform and development,CIAE formulated its objectives in human resource construction for the 13th Five-year Plan period,and achieved new apparent progress in human resource construction in 2015.1 Implementation of"LONGMA Project"

  15. Prophylaxis of invasive aspergillosis with caspofungin during construction works in patient with acute lymphoblasic leukemia treated with vincristin

    Directory of Open Access Journals (Sweden)

    Mojca Modic

    2012-12-01

    Case presentation: A 59-year old woman with common ALL relapsed after 22 years (normal cytogenetics. She was treated according to the UKALL XII regimen and achieved complete second remission. She received four cycles of vincristine 2 mg i.v. In a retrospective cohort study, prolonged neutropenia, use of steroids, nursing unit without laminar air flow during a period of construction works were associated with an increased incidence of invasive aspergillosis in patients who did not receive primary antifungal prophylaxis. Intravenous caspofungin was administered to the patient as primary aspergillosis prophylaxis on the first day of chemotherapy. Galactomannan antigen tests were negative during the period of neutropenia. There was no infection in the period of prolonged neutropenia. Conclusions: The author discusses primary prophylaxis of invasive aspergillosis with caspofungin during construction works in patients with acute lymphoblastic leukemia treated with vincristine. Because of non-conventional unit without laminar air flow during induction chemotherapy treatment, which leads to an increased risk of invasive fungal infection with Aspergillus, caspofungin prophylaxis is recommended at least until upgrade to laminar flow or cessation of construction works.

  16. Road Transportable Analytical Laboratory (RTAL) system. Quarterly progress report, May 1994--July 1994

    International Nuclear Information System (INIS)

    1994-01-01

    Progress achieved on the development of the RTAL system during the quarter, May 1 through July 31, 1994 is reported. The work included NEPA analysis, drawings, prototype system construction, and on-site prototype demonstration

  17. Pellets for fusion reactor refueling. Annual progress report, January 31, 1977--January 31, 1978

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-01-01

    Progress during the past year has occurred in the following areas. A pellet generator for larger pellets is currently under construction. Alternate pellet generation techniques are under investigation. Progress has been made on the pellet selection and acceleration scheme for the large pellet generator. Work has begun on ablation acceleration for accelerating pellets to very high velocities. In the area of pellet-plasma interactions work has been completed on a transonic flow model and papers have been published dealing with both experimental and theoretical aspects of the problem.

  18. Pellets for fusion reactor refueling. Annual progress report, January 31, 1977--January 31, 1978

    International Nuclear Information System (INIS)

    1978-01-01

    Progress during the past year has occurred in the following areas. A pellet generator for larger pellets is currently under construction. Alternate pellet generation techniques are under investigation. Progress has been made on the pellet selection and acceleration scheme for the large pellet generator. Work has begun on ablation acceleration for accelerating pellets to very high velocities. In the area of pellet-plasma interactions work has been completed on a transonic flow model and papers have been published dealing with both experimental and theoretical aspects of the problem

  19. USAGE OF CONSTRUCTION-ORIENTED SOFTWARE SCAD FOR ANALYSIS OF WORK OF MACHINE-BUILDING STRUCTURES

    Directory of Open Access Journals (Sweden)

    D. О. Bannikov

    2018-02-01

    Full Text Available Purpose. In the case of analysis of work of the machine-building structures, the direct usage of construction-oriented software developments is impossible, since ideology and methodology for solving various tasks in construction and machine-building are different. Therefore, in the conducting of practical calculations, there is a need for a certain adjustment of the approaches put in the program complexes and their adaptation to the engineering industry. The presentation of the author's experience of the construction-oriented software SCAD usage for Windows for analyzing the work of various machine-building structures, their components and assemblies is the immediate purpose of the publication. Methodology. During a long period of time the author was engaged in analyzing the work of building, mainly thin-walled, steel structures using the Finite Element Method based on the SCAD for Windows software package. At the same time, a considerable number of machine-building structures were considered, including railroad rolling stock units. Most of these tasks grew into a scientific and research problem that needed to be thoroughly researched and analyzed before giving design recommendations. Findings. The publication presents more than a dozen different tasks, typical for the machine-building industry, which the author had to deal with. Static and quasi-static problems, the problem of motion in time, the contact problem, the problem of the cracks deve-lopment, the physical and geometric non-linearity are among them. Accordingly, for each of these problems the main challenges, features and practical techniques developed during the work are presented, as well as the constructed finite element models are presented as an illustration. Originality. The experience of construction-oriented software product usage on the basis of the Finite Element Method for analyzing of the work of machine-building structures is generalized. A number of practical methods and

  20. Introduction of construction management system for preparation work of Shimane Nuclear Power Station Unit-3

    International Nuclear Information System (INIS)

    Sasaki, Yutaka; Tsumura, Isamu; Hayashi, Minoru; Nakamoto, Kenji

    2005-01-01

    The construction management system aims to have information on the construction management between the Chugoku Electric Power Co. Inc. and each contractor, and to work efficiently. The system has been operating during about half year. The system manages the manufacturing process, safety and quality. The aims, development process, characteristics, network construction of the system are reported. As outline of the construction management system, functions and construction management of each process, safety and quality and ITV camera are explained. The system will be used at construction of Shimane nuclear power station unit-3. (S.Y.)

  1. Progress report, Physics Division, 1 October - 31 December, 1981

    International Nuclear Information System (INIS)

    1982-03-01

    The work of the Physics Division during the quarter is reviewed. Nuclear physics activities included parity violation experiments, mass difference measurements using the ISOL facility, studies of high spin state decays, and scattering length measurements. In accelerator physics, construction of the heavy-ion superconducting cyclotron continued and development of the fast intense neutron source and the high current proton accelerator progressed. Neutron scattering experiments were carried out on a number of solids. Work in applied mathematics and computation is also reviewed

  2. From Disparity to Harmonisation of Construction Industry Payment Legislation in Australia: A Proposal for a Dual Process of Adjudication based upon Size of Progress Payment Claim

    OpenAIRE

    Coggins, Jeremy

    2011-01-01

    Since the introduction of the Building and Construction Industry Security of Payment Act into New South Wales in 1999, construction industry payment legislation has progressively been enacted on a jurisdiction-by-jurisdiction basis throughout Australia. Of the eight Australian Acts, two distinct legislative models can be discerned – what have been termed the ‘East Coast’ and ‘West Coast’ models. This article compares the two models with respect to their payment s...

  3. More work to do: a pathway for future progress on strengthening nuclear security

    NARCIS (Netherlands)

    Herbach, J.; Pitts-Kiefer, S.

    2015-01-01

    With the nuclear security summit process winding down but much work remaining, it is vital to initiate a process by which states can continue and expand on the substantial progress that already has been made.

  4. Progress report for 1986 from the Plutonium Contaminated Materials Working Party

    International Nuclear Information System (INIS)

    Higson, S.G.

    1987-11-01

    The paper covers progress during 1986 under the joint BNFL/MOD/DoE funded PCM Working Party studying the management, treatment and immobilization of plutonium contaminated materials. Development is reported under each of seven main programme headings including reduction of arisings, Pu measurement, decommissioning and non-combustible PCM treatment, liquid effluent treatment, sorting and packaging, PCM immobilisation and engineering objectives. (author)

  5. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    OpenAIRE

    Özlem Tüz; Şafak Ebesek

    2013-01-01

    Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of th...

  6. Kazakhstan participation in International Experimental Reactor ITER Construction project. Work status and prospects

    International Nuclear Information System (INIS)

    Tazhibayeva, I.L.; Tukhvatullin, Sh.T.; Shestakov, V.P.; Kuznetsov, B.A.

    2002-01-01

    Kazakhstan takes part in ITER project in partnership with Russian Federation since the year of 1994. At present the technical stage of the project is completed and ITER Council should take a decision on the site for international reactor. Four countries such as Canada, Japan, Spain and France have offered their territories for being used as site for launching ITER construction. ITER partners started preparing new international agreement that will cover activities on construction, operation and decommissioning of ITER. It will also include the list of research and experimental work that is conducted in support of ITER project. Kazakhstan has already made an important contribution into technical stage realization of ITER project due to scientific and technical researches conducted by National Nuclear Center, by Institute of Experimental and Theoretical Physics and by JSC 'Ulba Metallurgical plant' ('UMP'). Research activity carried out for the support of ITER project is performed in accordance with the following main trends: Tritium safety (permeability and retentin of hydrogen isotopes during in-pile irradiation in various structural materials, co-deposed layers and protective coatings); Verification of computer codes (LOCA type) loss of coolant accidents modeling in ITER reactor; Investigation of liquid metal blanket of thermonuclear reactor (tritium production in lithium containing eutectics Li17Pb83 and ceramics Li 2 TiO 3 , study of tritium permeability). At present the working group of ITER project participants started introducing proposals for cost distribution and for placing the orders on reactor construction. Further Kazakhstan participation in ITER project may be in manufacturing high-tech parts and assemblies from commercial grades of beryllium. They will be used for armouring the reactor first wall, for its thermal protection and for protection of superconductor's components for magnetic systems that are at JSC U MP'. Scientific and technical support of

  7. Progressive Finland sees progress with nuclear projects

    Energy Technology Data Exchange (ETDEWEB)

    Dalton, David [NucNet, Brussels (Belgium)

    2016-02-15

    The Finnish Hanhikivi-1 reactor project is firmly on track and a licence has been granted for construction of a final disposal facility for spent nuclear fuel - the first final repository in the world to enter the construction phase. Significant progress has been made with plans for Finland to build its sixth nuclear reactor unit at Hanhikivi. Fennovoima's licensing manager Janne Liuko said the company expects to receive the construction licence for the Generation III+ Hanhikivi-1 plant in late 2017. The application was submitted to the Finnish Ministry of Employment and the Economy in June 2015.

  8. Japanese experience in nuclear power plant construction

    International Nuclear Information System (INIS)

    Seko, T.

    1989-01-01

    Development of LWR in JAPAN started by introducing LWR from the U.S.A. Since then we have been improving existing technology and promoting domestic technology development based on experiences accumulated in Japan. As a result, recent operating performance has been excellent. As far as construction work is concerned, we also have been making our best efforts to improve the performance of construction work itself, with the cooperation of manufacturers. As for construction work, we have succeeded in improving the quality of construction work, shortening the construction period and reducing construction costs through new technology and Japanese-style work management

  9. Tokai works semi-annual progress report, July--December 1975

    International Nuclear Information System (INIS)

    1976-09-01

    The Power Reactor and Nuclear Fuel Development Corporation (PNC) is a semi-governmental organization responsible for the development of advanced power reactors and nuclear fuels in Japan. The Tokai Works is the PNC center for research and development of nuclear fuels concerned with plutonium fuels fabrication, fuel reprocessing, and centrifugal uranium enrichment. Accomplishments in the activities of Tokai Works during the latter half of 1975 are summarized as follows: (1) Plutonium fuels development--Fabrication of core fuel assemblies is being continued for initial loading of the Experimental Fast Breeder Reactor JOYO and remodeling is being carried out on the facility for fabrication of plutonium fuels for the Prototype Heavy Water Moderated and Boiling Light Water Cooled Reactor FUGEN; (2) Fuel reprocessing--Construction of the Tokai Reprocessing Plant is nearly completed and preparation for its commissioning is being made; (3) Development of centrifugal uranium enrichment is being performed successfully

  10. Construction of relativistic quantum theory: a progress report

    International Nuclear Information System (INIS)

    Noyes, H.P.

    1986-06-01

    We construct the particulate states of quantum physics using a recursive computer program that incorporates non-determinism by means of locally arbitrary choices. Quantum numbers and coupling constants arise from the construction via the unique 4-level combinatorial hierarchy. The construction defines indivisible quantum events with the requisite supraluminal correlations, yet does not allow supraluminal communication. Measurement criteria incorporate c, h-bar and m/sub p/ or (not ''and'') G, connected to laboratory events via finite particle number scattering theory and the counter paradigm. The resulting theory is discrete throughout, contains no infinities, and, as far as we have developed it, is in agreement with quantum mechanical and cosmological fact

  11. New Rule Use Drives the Relation between Working Memory Capacity and Raven's Advanced Progressive Matrices

    Science.gov (United States)

    Wiley, Jennifer; Jarosz, Andrew F.; Cushen, Patrick J.; Colflesh, Gregory J. H.

    2011-01-01

    The correlation between individual differences in working memory capacity and performance on the Raven's Advanced Progressive Matrices (RAPM) is well documented yet poorly understood. The present work proposes a new explanation: that the need to use a new combination of rules on RAPM problems drives the relation between performance and working…

  12. Transition to Work: Effects of Preparedness and Goal Construction on Employment and Depressive Symptoms

    Science.gov (United States)

    Koivisto, Petri; Vuori, Jukka; Vinokur, Amiram D.

    2010-01-01

    This study examines the mediating role of employment preparedness in improving employment, mental health, and construction of work-life goals among young vocational school graduates who participated in the School-to-Work effectiveness trial. The trial included a 1-week intervention program that focused on enhancing employment preparedness. In this…

  13. Savannah River Plant Works Technical Department monthly progress report for May 1958: Deleted Version

    Energy Technology Data Exchange (ETDEWEB)

    1958-06-17

    This progress report by the Atomic Energy Division of the Savannah River Plant covers: Reactor Technology; Separation Technology; Engineering Assistance; Health Physics; and General Laboratory Work. (JT)

  14. From Disparity to Harmonisation of Construction Industry Payment Legislation in Australia: A Proposal for a Dual Process of Adjudication based upon Size of Progress Payment Claim

    Directory of Open Access Journals (Sweden)

    Jeremy Coggins

    2011-06-01

    Full Text Available Since the introduction of the Building and Construction Industry Security of Payment Act into New South Wales in 1999, construction industry payment legislation has progressively been enacted on a jurisdiction-by-jurisdiction basis throughout Australia. Of the eight Australian Acts, two distinct legislative models can be discerned – what have been termed the ‘East Coast’ and ‘West Coast’ models. This article compares the two models with respect to their payment systems and adjudication schemes, procedural justice afforded, incursion upon freedom of contract, uptake rates and efficiency. From this comparison, the strengths and weaknesses of the two models are identified. Finally, a dual process of adjudication based on progress payment claim size is proposed for a harmonised model, developed from previous proposals put forward by other authors, which aims to combine the strengths of the two existing models.

  15. Construction of relativistic quantum theory: a progress report

    Energy Technology Data Exchange (ETDEWEB)

    Noyes, H.P.

    1986-06-01

    We construct the particulate states of quantum physics using a recursive computer program that incorporates non-determinism by means of locally arbitrary choices. Quantum numbers and coupling constants arise from the construction via the unique 4-level combinatorial hierarchy. The construction defines indivisible quantum events with the requisite supraluminal correlations, yet does not allow supraluminal communication. Measurement criteria incorporate c, h-bar and m/sub p/ or (not ''and'') G, connected to laboratory events via finite particle number scattering theory and the counter paradigm. The resulting theory is discrete throughout, contains no infinities, and, as far as we have developed it, is in agreement with quantum mechanical and cosmological fact.

  16. Constructing Potential Energy Surfaces for Polyatomic Systems: Recent Progress and New Problems

    Directory of Open Access Journals (Sweden)

    J. Espinosa-Garcia

    2012-01-01

    Full Text Available Different methods of constructing potential energy surfaces in polyatomic systems are reviewed, with the emphasis put on fitting, interpolation, and analytical (defined by functional forms approaches, based on quantum chemistry electronic structure calculations. The different approaches are reviewed first, followed by a comparison using the benchmark H + CH4 and the H + NH3 gas-phase hydrogen abstraction reactions. Different kinetics and dynamics properties are analyzed for these reactions and compared with the available experimental data, which permits one to estimate the advantages and disadvantages of each method. Finally, we analyze different problems with increasing difficulty in the potential energy construction: spin-orbit coupling, molecular size, and more complicated reactions with several maxima and minima, which test the soundness and general applicability of each method. We conclude that, although the field of small systems, typically atom-diatom, is mature, there still remains much work to be done in the field of polyatomic systems.

  17. Predictive Validity of the PCL-R for Offenders with Intellectual Disability in a High Security Hospital: Treatment Progress

    Science.gov (United States)

    Morrissey, Catrin; Mooney, Paul; Hogue, Todd E.; Lindsay, William R.; Taylor, John L.

    2007-01-01

    Background: Among mainstream offenders, the severe personality disorder of psychopathy has considerable importance as a construct. The disorder has long been associated with failure to make treatment progress. Previous work has identified that psychopathy as a disorder occurs in samples of offenders with intellectual disability (ID), and suggests…

  18. The design and construction of the bottom working for in-situ leaching of fragmented uranium ore by blasting in No. 745 mine

    International Nuclear Information System (INIS)

    Ding Dexin; Yang Shijiao; Li Ming

    1998-11-01

    Bottom working is a very important structure for in-situ leaching of fragmented uranium ore by blasting. Its design and construction should simultaneously satisfy the requirements for receiving fragmented ore, transporting the ore, providing relief space for blast operation, passage for workers and fresh air for the slope and collecting the pregnant solution from spraying over the fragmented ore. The author deals with the design and construction of the complete water cutoff bottom working for collecting the pregnant solution for in-situ leaching of fragmented uranium ore by long hole blast in No. 745 mine in Guangdong Province. The preparation system for the block, the undercutting, the construction process and method of the bottom working and the measures to guide the solution leaked into the surrounding rock mass to the bottom of the block are described in detail

  19. Outline of additional installation works in Oi Nuclear Power Station

    International Nuclear Information System (INIS)

    Shibata, Atsuo; Matsuoka, Motokazu

    1987-01-01

    At present in Oi Nuclear Power Station, Kansai Electric Power Co., Inc., No.1 and No.2 plants of 1175 MWe each are in operation. In order to stabilize power supply for a long term, the additional installation of No.3 and No.4 plants of 1180 MWe each is in progress. The No.3 and No.4 plants are PWRs, for which prestressed concrete reactor containment vessels were adopted, and the start of operation is scheduled in October, 1991 in No.3 plant and in August, 1992 in No.4 plant. In the execution of main construction works, the preservation of the existing plants is the most important. For excavating the tunnels for seawater channels, tunnel boring machines were used, to avoid blasting. Pneumatic caisson method was adopted for a part of the circulating pump building. No vibration, no noise piling method was adopted for respective sheathing construction. The blasting vibration control in the excavation for foundations and the analysis of the behavior of retaining walls are to be carried out by information-oriented work execution. The outline of the main construction works and the preservation of the existing facilities are reported. (Kako, I.)

  20. Insulin resistance and hyperinsulinaemia in mild to moderate progressive chronic renal failure and its association with aerobic work capacity

    DEFF Research Database (Denmark)

    Eidemak, I; Feldt-Rasmussen, B; Kanstrup, I L

    1995-01-01

    Tissue sensitivity to insulin and aerobic work capacity was measured in patients with mild to moderate progressive chronic renal failure. Twenty-nine non-diabetic patients with a glomerular filtration rate of 25 ml.min-1.1.73 m-2 (11-43) (median, range) and 15 sex, age, and body mass index matched.......02) (M/I ratio 1.77 +/- 0.71 vs 2.57 +/- 0.70 (mg/(kgBW.min) per pmol/l.100, p aerobic work capacity was significantly lower in the patients than in the control subjects (24 +/- 8 vs 32 +/- 11 ml O2/(kg body weight.min), p .../I ratio in both groups. In conclusion, not only patients with end-stage chronic renal failure but also those with mild to moderate progressive chronic renal failure are insulin resistant and hyperinsulinaemic. The tissue sensitivity to insulin is correlated to the maximal aerobic work capacity suggesting...

  1. Nuclear power plants. Construction status report, data as of September 30, 1977

    International Nuclear Information System (INIS)

    1977-10-01

    The report provides information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. T he status of 93 plants authorized to engage in construction activities is summarized. This total includes (4) plants with construction exemptions, and (11) plants with Limited Work Authorization Permits

  2. Modelling of project cash flow on construction projects in Malang city

    Science.gov (United States)

    Djatmiko, Bambang

    2017-09-01

    Contractors usually prepare a project cash flow (PCF) on construction projects. The flow of cash in and cash out within a construction project may vary depending on the owner, contract documents, and construction service providers who have their own authority. Other factors affecting the PCF are down payment, termyn, progress schedule, material schedule, equipment schedule, manpower schedules, and wages of workers and subcontractors. This study aims to describe the cash inflow and cash outflow based on the empirical data obtained from contractors, develop a PCF model based on Halpen & Woodhead's PCF model, and investigate whether or not there is a significant difference between the Halpen & Woodhead's PCF model and the empirical PCF model. Based on the researcher's observation, the PCF management has never been implemented by the contractors in Malang in serving their clients (owners). The research setting is in Malang City because physical development in all field and there are many new construction service providers. The findings in this current study are summarised as follows: 1) Cash in included current assets (20%), owner's down payment (20%), termyin I (5%-25%), termyin II (20%), termyin III (25%), termyin IV (25%) and retention (5%). Cash out included direct cost (65%), indirect cost (20%), and profit + informal cost(15%), 2)the construction work involving the empirical PCF model in this study was started with the funds obtained from DP or current assets and 3) The two models bear several similarities in the upward trends of direct cost, indirect cost, Pro Ic, progress billing, and S-curve. The difference between the two models is the occurrence of overdraft in the Halpen and Woodhead's PCF model only.

  3. Informed consent in Croatia. A work in progress.

    Science.gov (United States)

    Vučemilo, Luka; Borovečki, Ana

    2014-07-01

    As Croatia makes the transition from one political system and type of economy to another, there are inevitable social and political changes that have a profound affect on the healthcare system. This article charts some of the progress of change with respect to patients' rights and informed consent.

  4. Progress report for 1982/83 from the Plutonium Contaminated Materials Working Party

    International Nuclear Information System (INIS)

    Higson, S.G.

    1983-01-01

    The report falls under the headings: introduction (definitions of plutonium contaminated materials (PCM)); organisation and role of the Plutonium Contaminated Materials Working Party; management practices in relation to PCM; 1982/1983 Progress Report (engineering objectives; reduction of PCM arisings; plutonium measurement; development of treatment processes; decommissioning and non-combustible PCM treatment; washing of shredded combustible PCM; PCM immobilisation; liquid effluent treatment; actinide chemistry); programme management. (U.K.)

  5. Innovations in nuclear concrete constructions

    International Nuclear Information System (INIS)

    Tatum, C.B.

    1983-01-01

    The technical requirements and scope of concrete work on nuclear projects present significant engineering and construction challenges. These demands represent the extremes in many areas of construction operations. In meeting these challenges, engineering and construction forces have developed several innovations which can be beneficially applied to other types of construction. Innovative approaches in the general categories of engineering scope, construction input to engineering, work planning, special methods and techniques, and satisfaction of quality assurance requirements are given in this paper. The transfer of this technology to other segments of the construction industry will improve overall performance by avoiding the problem areas encountered on nuclear projects

  6. The “green wave” mode production on the two-lane highways during the construction works time period

    Directory of Open Access Journals (Sweden)

    А. Berezhnoy

    2007-12-01

    Full Text Available In the paper, the problem of a bi-directional “green wave” mode production is considered for the vehicle flows motion on two-lane highways during the conducting of construction works. The solution of the given task allows to develop practical recommendations for the sphere of the construction works management on two-lane roads and country highways, and also to raise traffic control efficiency in the pointed conditions. The comparative analysis of possible traffic regulation modes for the set scheme of road construction works sites and the estimation of their effi ciency is performed, the test of a hypothesis regarding the possibility of a bi-directional “green wave” mode realization is carried out, and calculation of traffic lights signal control phases time is performed.

  7. Experiences for construction and preoperation test of Shimane nuclear power station

    International Nuclear Information System (INIS)

    Niki, Yoshiya; Taniguchi, Takashi.

    1975-01-01

    Shimane nuclear power station of Chugoku Electric Power Company has begun its commercial operation on March 29, 1974 after the construction period of 49.5 months. The fundamental construction process which Chugoku Electric Power Company and Hitachi Ltd. had agreed was 45 month process, which was the readjustment of the construction process which General Electric Company had presented for preceding nuclear power plants in Japan and its results. The achieved construction and test process required 49.5 months with 4.5 months delay. This delay occurred in two points. The one was caused by the ''upside down'' problem of control rods which had been imported from G.E. The another was caused by the restriction of the rate of load increasing. Fuel charging which indicates the substantial finish of construction works, had begun at May 1, 1973 on schedule. Therefore it can be said that the construction works had been carried out just according to the fundamental process. However, analyzing the result of progress, the pressure test of a reactor containment vessel and the set-up and the first pressure test of a reactor pressure vessel led the schedule by about 2 months. On the contrary, the subsequent works delayed by just that leading time. (Tai, I.)

  8. LSST summit facility construction progress report: reacting to design refinements and field conditions

    Science.gov (United States)

    Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo

    2016-07-01

    The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.

  9. Scientific Support of Construction of Unique Buildings and Structures and Facilities of Increased Danger

    Science.gov (United States)

    Alekhin, V. N.; Antipin, A. A.; Gorodilov, S. N.

    2017-11-01

    A range of works on scientific support for the construction of unique buildings and the structures and facilities of increased danger, such as airport facilities, long-span and high-rise buildings is being implemented at the department “Computer Aided Design in Civil Engineering” of Ural Federal University. The scope of work includes: numerical simulation of wind and snow loads, analysis of progressive collapse and seismic impacts, verification of design solutions. The results of wind, snow loads and progressive collapse of airport buildings in the cities of Orenburg, Rostov-on-Don and Perm are considered in the article.

  10. Concreting organization during Chernobylsk NPP construction

    International Nuclear Information System (INIS)

    Lysyuk, R.I.; Kareva, A.P.

    1984-01-01

    Conreting organization during the Chernobylsk NPP construction is described. Processes of extra heavy concrete production and placement, which specific mass constitutes 4t/m 3 at the age of 28 days wiath metallic aggregates and 3.3-3.5 t/m 3 at the same age without aggregates, are considered in short. Basic characteristics of this concrete are presented. At the 4th power unit labour contents for construction works were a 1.5 times lower as compared to the 3rd power unit erection. This progress was achieved by round-the-clock operation of the concrete plant with the 800 m 3 /day output and also by utilization of special equipment for mechanized concrete placement: concrete pumps, automatic concrete mixer, manipulators and concrete pipelines

  11. Progress on Radioactive Waste Treatment Facilities Construction

    Institute of Scientific and Technical Information of China (English)

    2011-01-01

    In 2011, five projects were undertaken by radioactive waste projects management department, which are "Cold Commissioning of the Pilot Project on Radioactive Waste Retrieval and Conditioning (abbreviation 'Pilot Project')", "Radioactive Ventilation Project Construction (abbreviation 'Ventilation

  12. Evaluation of a real-time travel time prediction system in a freeway construction work zone : final report, March 2001.

    Science.gov (United States)

    2001-03-01

    A real-time travel time prediction system (TIPS) was evaluated in a construction work zone. TIPS includes changeable message signs (CMSs) displaying the travel time and distance to the end of the work zone to motorists. The travel times displayed by ...

  13. Outline of design and construction work related to the installation of freshwater storage tank at Higashidori Nuclear Power Station

    International Nuclear Information System (INIS)

    Ozaki, Mitsuhiro; Yamaguchi, Kazuhide; Suzuki, Takeshi

    2017-01-01

    Tohoku Electric Power Co., Ltd., at its Higashidori Nuclear Power Station, is promoting the installation of safety measure facilities as an effort to restart the operation. It is implementing a freshwater storage tank installation work to secure core cooling function at the time of severe accident occurrence. Construction started in June 2014, drilling and construction of the framework have advanced while paying due attention to quality assurance, and affiliated facilities are currently under construction. This paper reports the outline of planning, design, and construction work of this project. (A.O.)

  14. Design and construction work of underground pit for existing light oil tank foundation at Onagawa Nuclear Power Station

    International Nuclear Information System (INIS)

    Kikuchi, Keita; Date, Masanao; Horimi, Shingo

    2017-01-01

    Based on the new regulatory standards for commercial power plant reactors enforced in July 2013, Onagawa Nuclear Power Station of Tohoku Electric Power Co., Inc. implemented various safety measure works. One of them was a measure for the existing light oil tank foundation for emergency diesel generators for Unit 2 reactor. In consideration of tornado, external fire, and earthquake resistance, the company implemented the underground pit construction for a light oil tank basement by utilizing the existing oil retaining wall and foundation. This paper reported the outline of the planning, design, and implementation of construction works, which were carried out while securing quality and safety. Upon installation of the underground pit, the company utilized the existing oil retaining wall from the viewpoint of reducing construction costs, shortening time schedule, and reducing environmental burden. As a result of checking bending and axial force, part of these values exceeded the design reference values. So, 3-dimensional shell model was applied, and the simulation results showed sufficient seismic margin. As a measure to secure seismic margin against shear force, Ceramic-Cap-bar construction method was adopted. Upon construction, the company adopted the water jet method, and devised the sequential order of construction. In parallel with the day and night work and tank installation, it constructed the top slab, which secured the time schedule and quality. (A.O.)

  15. Development work for the Japanese LCT coil and its design and construction

    International Nuclear Information System (INIS)

    Shimamoto, Susumu; Ando, Toshinari; Tsuji, Hiroshi; Yasukochi, Ko

    1984-01-01

    This paper describes design, verification tests, and construction of the Japanese test coil for the Large Coil Task (LCT). Japan Atomic Energy Research Institute (JAERI) signed on the LCT international agreement under the International Energy Agency (IEA) in 1978, and since then JAERI has been working to develop the Japanese LCT coil to explore the problems of design and construction of tokamak toroidal coil. Based on the common requirements of the LCT, the Japanese LCT coil was designed to be a pool-cooled NbTi fully-stabilized coil whose operating current is 10,220 A at 8 T. Through research and development of the Japanese LCT coil, new advances in the super-conducting coil technology were obtained, such as mechanically and chemically treated conductor surface that has high heat transfer about four times as much as usual ones, nitrogen-strengthened stainless steel that has the yield strength twice as much as usual stainless steel, NbTi filaments those have the critical current density twice as much as those before LCT, and so on. These advances have enabled to construct the Japanese LCT coil and it was completed in the spring of 1982. During the construction of the coil, new fabrication techniques were obtained to wind large current conductor into a mechanically rigid coil and thus to construct a totally stable large coil. (author)

  16. Progress Report

    DEFF Research Database (Denmark)

    Duer, Karsten

    1999-01-01

    Progress report describing the work carried out by the Danish participant in the ALTSET project in the period January 1999 to July 1999.......Progress report describing the work carried out by the Danish participant in the ALTSET project in the period January 1999 to July 1999....

  17. Use of explosives in pipeline construction work

    Energy Technology Data Exchange (ETDEWEB)

    Ball, M J

    1976-08-01

    Explosives are an essential tool in Great Britain's pipeline-construction industry, with applications on dry land and under water, in trench blasting and tunneling for road and service crossings, demolition of unwanted sections, and removal of coatings. Nobels Explosive Co. Ltd. describes basic explosives operations as pertaining to the requirements of rock trenching, submarine operations, thrust-bore and tunneling operations, demolitions, and precision blasting.

  18. Main trends in scientific-research works during construction and operation of uranium mines and open cuts

    International Nuclear Information System (INIS)

    Mosinets, V.N.

    1993-01-01

    Consideration is given to main trends in research works during construction and operation of uranium mines and open cuts of Priargunsky mine-chemical association. Develops and introduced principally new design solutions and technologies in the field of open mining, underground mining, as well as in-situ and heap leaching, are described

  19. Balancing Study and Paid Work: The Experiences of Construction Undergraduates in an Australian University

    Directory of Open Access Journals (Sweden)

    Helen Lingard

    2012-11-01

    Full Text Available A questionnaire survey was undertaken among third year studentsenrolled in the University of Melbourne’s Bachelor of Property andConstruction (BPC programme. The survey explored students’experiences in balancing paid work with study. Hours spent in paidemployment were at least as long and, in many cases, were inexcess of hours spent at university. While work was not perceivedby students to pose a difficulty for attending lectures and tutorials,students indicated that their paid work made it difficult for them toengage in independent learning activities, such as using libraryresources or preparing for classes by reading beforehand. Twoscales, previously used in other countries to measure students’burnout and engagement, were tested. Both scales were foundto be valid and reliable in that the factorial structures foundin previous studies were confirmed and acceptable internalconsistency reliability coefficients were generated for each of thescales’ component factors. This opens the way for more in-depthmultivariate analysis to determine the linkages between workhours, work-study conflict and students’ burnout or engagementwith university life.

  20. Working through resistance in engaging boys and men towards gender equality and progressive masculinities

    Science.gov (United States)

    Ratele, Kopano

    2015-01-01

    Over the last two decades, a focus on challenging and transforming dominant forms of masculinity and engaging boys and men towards gender equality and healthy masculinities has permeated South African social and health sciences and the humanities. This focus on men and boys has also been evident in intervention and activist work. However, the turn to boys, men and masculinities has not gone without resistance, contestation and contradictions. A range of localised and global realities has frustrated much of the enthusiasm for rapid, sweeping and concrete changes regarding gender justice and the making of progressive masculinities. Among the discursive and material forces that oppose work that engages boys and men are those to do with income-related issues, race and racism, cultural traditions and gender itself. Because of this, it is contended that engagement with boys and men needs to consider not only gender but also economic inequality, poverty and unemployment, divisions created by race, and struggles around tradition. This paper discusses these forces that undermine and counteract work with boys and men and how we might work through resistance in engaging with men and boys. PMID:26073936

  1. Working through resistance in engaging boys and men towards gender equality and progressive masculinities.

    Science.gov (United States)

    Ratele, Kopano

    2015-01-01

    Over the last two decades, a focus on challenging and transforming dominant forms of masculinity and engaging boys and men towards gender equality and healthy masculinities has permeated South African social and health sciences and the humanities. This focus on men and boys has also been evident in intervention and activist work. However, the turn to boys, men and masculinities has not gone without resistance, contestation and contradictions. A range of localised and global realities has frustrated much of the enthusiasm for rapid, sweeping and concrete changes regarding gender justice and the making of progressive masculinities. Among the discursive and material forces that oppose work that engages boys and men are those to do with income-related issues, race and racism, cultural traditions and gender itself. Because of this, it is contended that engagement with boys and men needs to consider not only gender but also economic inequality, poverty and unemployment, divisions created by race, and struggles around tradition. This paper discusses these forces that undermine and counteract work with boys and men and how we might work through resistance in engaging with men and boys.

  2. Progressive Retirement Programme and Part-time work as a pre-retirement measure

    CERN Multimedia

    HR Department

    2006-01-01

    Following discussion at the Standing Concertation Committee at its meeting on 25 January 2006, the Director-General has approved the extension of the Progressive Retirement Programme with effect from 1 April 2006 until 31 March 2007; of the Part-time work scheme as a pre-retirement measure for the year 2006, i.e. until 31 December 2006. Human Resources Department Tel. 72808/74128

  3. Progress report for 1984/85 from the Plutonium Contaminated Materials Working Party

    International Nuclear Information System (INIS)

    Higson, S.G.

    1985-01-01

    The progress report for 1984/5 from the 'Plutonium Contaminated Materials Working Party' is presented. The report is divided into eight main topics, each discussed separately, and include: reduction of arisings, plutonium measurement, sorting and packaging, washing of shredded combustible plutonium contaminated materials (PCM), decommissioning and non-combustible PCM treatment, PCM immobilization, treatment of alpha bearing liquid wastes, and engineering objectives. (U.K.)

  4. Warehouse sizing algorithm for edification works of construc-tion sector

    Directory of Open Access Journals (Sweden)

    Andres Mauricio Hualpa Zuñiga

    2015-08-01

    Full Text Available This article contains the development of an algorithm applied to the solution of problems of sizing of storage spaces in companies in the construction sector. This problem is justified under the degree of informality that occurs at the time of assigning storage areas, without considering parameters related to stages of construction, the characteristics of the product and the provisions of the work area. In a previous study it is identified that the degree of informality at the moment of assigning storage areas, generates poor rates of capacity utilization and delivery of incomplete orders. The design of the algorithm is supported by a comprehensive model of sizing subjected to a system of equations with variables of quantity, volume and material dimensions, to finally establish the necessary storage area. The algorithm is adapted to programming language in order to present the results in graphic language where the sizing of storage spaces is visible. These results are validated through the evaluation of storage capacity utilization and completely delivered orders for different cargo units, where improvements in these indicators are shown.

  5. Progress in construction of liquid metal LiPb experimental loops in China

    International Nuclear Information System (INIS)

    Zhang, M.; Zhu, Z.; Gao, S.; Song, Y.; Li, C.; Huang, Q.; Wu, Y.

    2007-01-01

    The activities of FDS series fusion reactors design with liquid tritium breeder blankets have been performed at ASIPP (Institute of Plasma Physics, Chinese Academy of Sciences) for years. In the designs, CLAM (China Low Activation Martensitic steel), is considered as the primary candidate structural material and LiPb eutectic as both tritium breeder and coolant of the blankets. Therefore, researches on LiPb experimental loop and construction of LiPb loop are severely needed in order to carry out experimental study on the compatibility of candidate structural materials for fusion reactors such as CLAM etc., flowing characteristics of LiPb and Magnetohydrodynamic (MHD) effect and so on, which is essential to researches of China liquid LiPb blankets. A lot of work has been done at ASIPP on design, manufacture and experiments for the series LiPb experimental loops i.e. Dragon-I, Dragon-II, Dragon-III and Dragon-IV. Dragon-I is a thermal convection LiPb loop made of SS316L steel and operating at 500 degree C. The first 3000 hour loop operation at 480 degree C for compatibility test on CLAM was done. Dragon-II and Dragon-III are also thermal convection LiPb loops, made of Inconel 600 and SiCr/SiC, and operating at 700 degree C and 1000 degree C, respectively, to obtain corrosion results of materials such as SiCr/SiC composite. Dragon-II has already been built up and under testing. Dragon-III is under construction. Base on requirement for experiments on characteristics of LiPb on its flow, MHD effect and corrosion to materials, Dragon-IV forced convection loop is being designed. The operation temperature ranges from 480 degree C at the cold leg to 700 degree C at the hot leg, the magnetic field is about 2-5T. Experiments and related studies in those loops are underway. (authors)

  6. Constructing and Disciplining the Working Body: Organisational Discourses, Globalisation and the Mobile Worker

    OpenAIRE

    Crowley-Henry, Marian; Donnelly, Paul

    2011-01-01

    Implicit in the metaphor of human resources is that the human is equated with, or placed on a similar level to, material resources, such that the working body is experienced in similar ways to financial, technical or natural resources. Such implicit meaning raises not only the value issue of equating people with material resources, but also points to the construction of very specific realities in work organisations that result from the use of such a metaphor (Dachler and Enderle 1989). In man...

  7. Advanced construction management for lunar base construction - Surface operations planner

    Science.gov (United States)

    Kehoe, Robert P.

    1992-01-01

    The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

  8. The progress and issues of national nuclear and radiation safety supervision and MIS

    International Nuclear Information System (INIS)

    Zhou Kefei; Sun Guochen; Jiang Guang; Li Jingxi; Zhang Lin

    2009-01-01

    The article briefly describes the pre-planning construction of 'National Nuclear and Radiation Safety Supervision and Management Information System', Including the overall frame of the system and the main issues found in the work which affect and confine the progress of the program. Some recommendations are put forward. (authors)

  9. FY 2017-Progress Report on the Design and Construction of the Sodium Loop SMT-3

    Energy Technology Data Exchange (ETDEWEB)

    Natesan, K. [Argonne National Lab. (ANL), Argonne, IL (United States); Momozaki, Y. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2017-09-01

    This report provides an update on the design of a forced-convection sodium loop to be used for the evaluation of sodium compatibility of advanced Alloy 709 with emphasis on long term exposures of tensile, creep, fatigue, creep fatigue, and fracture toughness ASTM-size specimens in support of ASME Code qualification and NRC licensing. The report is a deliverable (Level 4) in FY17 (M4AT-17AN1602094), under the Work Package AT-17AN160209, “Sodium Compatibility” performed by Argonne National Laboratory (ANL), as part of the Advanced Materials Program for the Advanced Reactor Technology. This work package enables the development of advanced structural materials by providing corrosion, microstructure, and mechanical property data from the standpoint of sodium compatibility of advanced structural alloys. The first sodium loop (SMT-1) with a single tank was constructed in 2011 at ANL and has been in operation for exposure of subsize sheet specimens of advanced alloys at a single temperature. The second sodium loop with dual tanks (SMT-2) was constructed in 2013 and has been in operation for the exposure of subsize sheet specimens of advanced alloys at two different temperatures. The current loop (SMT-3) has been designed to incorporate sufficient chamber capacity to expose a large number of ASTM-size specimens to evaluate the sodium effects on tensile, creep, fatigue, creep-fatigue, and fracture toughness properties, in support of ASME Code Qualification and USNRC Licensing. The design of individual components for the third sodium loop SMT-3 is almost complete. The design also has been sent to an outside vendor for piping analysis to be in compliance with ASME Code. A purchase order has been placed with an outside vendor for the fabrication of major components such as the specimen exposure tanks. However, we have contracted with another vendor to establish the piping design in compliance with ASME design codes. The piping design was completed in FY2017 and the

  10. HITACHI construction CAE system

    International Nuclear Information System (INIS)

    Yoshida, M.

    1994-01-01

    Construction and maintenance of nuclear power plants have important problems such as shortening the construction period and reducing the construction cost. Recently, the problem of insufficient construction labor has arisen, and as drastic strategic development has become a necessary counter-measure. The following four principles are included in the measures to be taken for efficient execution of the construction work within the short construction period: (1) reduction of on-site work and expansion of module block making, (2)improvement of the accuracy of the on-site work process, adjustment and expansion of the work in parallel with the construction process, (3)improvement of efficiency of the on-site work and mechanization and automation of the work, (4)improvement of the accuracy of the management of the construction. A three dimensional simulation system plant construction plan CAE, comprising five modules has been developed. A project management system was also developed to improve the accuracy and efficiency of management work in the field

  11. A survey on the progress with implementation of the radiography profession's career progression framework in UK radiotherapy centres

    International Nuclear Information System (INIS)

    James, Sarah; Beardmore, Charlotte; Dumbleton, Claire

    2012-01-01

    Aim: The purpose of the survey was to benchmark the progress with implementing the radiography profession's career progression framework within radiotherapy centres across the United Kingdom (UK). Methods: A survey questionnaire was constructed using the Survey Monkey™ tool to assess implementation of the career progression framework of the Society and College of Radiographers. Once constructed, an on line link to the survey questionnaire was emailed to all radiotherapy centre managers in the UK (N = 67) who were invited to provide one response per centre. The survey comprised twenty nine questions which were grouped into nine sections. Key results: The workforce profile indicates that increases in assistant, advanced and consultant level practitioners are required to meet National Radiotherapy Advisory Group recommendations with only a small number of centres having fully implemented the career progression framework. The overall vacancy level across the therapeutic radiography workforce was 4.6% at the time of the survey. Conclusions: and Recommendations: The survey has highlighted some progress with implementation of the career progression framework across the UK since its launch in 2000. However the current level of implementation demonstrated is disappointing considering it is a key recommendation within the NRAG Report 2007 with respect to England. It is recommended that all centres undertake a multi-professional workforce review to embed the career progression framework within their service in order to meet the workforce challenge associated with the required anticipated large growth in radiotherapy capacity.

  12. Assessing working memory in children with ADHD: Minor administration and scoring changes may improve digit span backward's construct validity.

    Science.gov (United States)

    Wells, Erica L; Kofler, Michael J; Soto, Elia F; Schaefer, Hillary S; Sarver, Dustin E

    2018-01-01

    Pediatric ADHD is associated with impairments in working memory, but these deficits often go undetected when using clinic-based tests such as digit span backward. The current study pilot-tested minor administration/scoring modifications to improve digit span backward's construct and predictive validities in a well-characterized sample of children with ADHD. WISC-IV digit span was modified to administer all trials (i.e., ignore discontinue rule) and count digits rather than trials correct. Traditional and modified scores were compared to a battery of criterion working memory (construct validity) and academic achievement tests (predictive validity) for 34 children with ADHD ages 8-13 (M=10.41; 11 girls). Traditional digit span backward scores failed to predict working memory or KTEA-2 achievement (allns). Alternate administration/scoring of digit span backward significantly improved its associations with working memory reordering (r=.58), working memory dual-processing (r=.53), working memory updating (r=.28), and KTEA-2 achievement (r=.49). Consistent with prior work, these findings urge caution when interpreting digit span performance. Minor test modifications may address test validity concerns, and should be considered in future test revisions. Digit span backward becomes a valid measure of working memory at exactly the point that testing is traditionally discontinued. Copyright © 2017 Elsevier Ltd. All rights reserved.

  13. Assessment of the long-term impacts of PM10 and PM2.5 particles from construction works on surrounding areas.

    Science.gov (United States)

    Azarmi, Farhad; Kumar, Prashant; Marsh, Daniel; Fuller, Gary

    2016-02-01

    Construction activities are common across cities; however, the studies assessing their contribution to airborne PM10 (≤10 μm) and PM2.5 (≤2.5 μm) particles on the surrounding air quality are limited. Herein, we assessed the impact of PM10 and PM2.5 arising from construction works in and around London. Measurements were carried out at 17 different monitoring stations around three construction sites between January 2002 and December 2013. Tapered element oscillating microbalance (TEOM 1400) and OSIRIS (2315) particle monitors were used to measure the PM10 and PM2.5 fractions in the 0.1-10 μm size range along with the ambient meteorological data. The data was analysed using bivariate concentration polar plots and k-means clustering techniques. Daily mean concentrations of PM10 were found to exceed the European Union target limit value of 50 μg m(-3) at 11 monitoring stations but remained within the allowable 35 exceedences per year, except at two monitoring stations. In general, construction works were found to influence the downwind concentrations of PM10 relatively more than PM2.5. Splitting of the data between working (0800-1800 h; local time) and non-working (1800-0800 h) periods showed about 2.2-fold higher concentrations of PM10 during working hours when compared with non-working hours. However, these observations did not allow to conclude that this increase was from the construction site emissions. Together, the polar concentration plots and the k-means cluster analysis applied to a pair of monitoring stations across the construction sites (i.e. one in upwind and the other in downwind) confirmed the contribution of construction sources on the measured concentrations. Furthermore, pairing the monitoring stations downwind of the construction sites showed a logarithmic decrease (with R(2) about 0.9) in the PM10 and PM2.5 concentration with distance. Our findings clearly indicate an impact of construction activities on the nearby downwind areas and a need

  14. Progressive Retirement Programme and Part-time work as a pre-retirement measure

    CERN Multimedia

    Human Resources Department

    2004-01-01

    Following discussion at the Standing Concertation Committee at its meeting on 8 November 2004, the Director-General has approved the extension of the Progressive Retirement Programme with effect from 1 April 2005 until 31 March 2006; of the Part-time work scheme as a pre-retirement measure with effect from 1 January 2005 until 31 December 2005. Human Resources Department Tel. 72808/74128

  15. Progressive Retirement Programme and Part-time work as a pre-retirement measure

    CERN Document Server

    2003-01-01

    Upon the proposal of the Standing Concertation Committee at its meeting on 25 November 2002, the Director-General has approved the extension for one year of the Progressive Retirement Programme with effect from 1 April 2003, and of the Part-time work scheme as a pre-retirement measure for requested effective dates commencing not later than 1 January 2004. Human Resources Division Tel. 72808/74128

  16. Progress Toward Heavy Ion IFE

    International Nuclear Information System (INIS)

    Meier, W.R.; Logan, B.G.; Waldron, W.L.; Sabbi, G.L.; Callahan-Miller, D.A.; Peterson, P.F.; Goodin, D.T.

    2002-01-01

    Successful development of Heavy Ion Fusion (HIF) will require scientific and technology advances in areas of targets, drivers and chambers. Design work on heavy ion targets indicates that high gain (60-130) may be possible with a -3-6 MJ driver depending on the ability to focus the beams to small spot sizes. Significant improvements have been made on key components of heavy ion drivers, including sources, injectors, insulators and ferromagnetic materials for long-pulse induction accelerator cells, solid-state pulsers, and superconducting quadrupole magnets. The leading chamber concept for HIF is the thick-liquid-wall HYLEE-II design, which uses an array of flibe jets to protect chamber structures from x-ray, debris, and neutron damage. Significant progress has been made in demonstrating the ability to create and control the types of flow needed to form the protective liquid blanket. Progress has also been made on neutron shielding for the final focus magnet arrays with predicted lifetimes now exceeding the life of the power plant. Safety analyses have been completed for the HYLEE-II design using state-of-the-art codes. Work also continues on target fabrication and injection for HE. A target injector experiment capable of > 5 Hz operation has been designed and construction will start in 2002. Methods for mass production of hohlraum targets are being evaluated with small-scale experiments and analyses. Progress in these areas will be reviewed

  17. Progress toward heavy-ion IFE

    International Nuclear Information System (INIS)

    Meier, W.R.; Logan, B.G.; Waldron, W.L.; Sabbi, G.-L.; Callahan, D.A.; Peterson, P.F.; Goodin, D.T.

    2002-01-01

    Successful development of heavy-ion fusion (HIF) will require scientific and technology advances in areas of targets, drivers and chambers. Design work on heavy-ion targets indicates that high gain (60-130) may be possible with a ∼3-6 MJ driver depending on the ability to focus the beams to small spot sizes. Significant improvements have been made on key components of heavy-ion drivers, including sources, injectors, insulators and ferromagnetic materials for long-pulse induction accelerator cells, solid-state pulsers, and superconducting quadrupole magnets. The leading chamber concept for HIF is the thick-liquid-wall HYLIFE-II design, which uses an array of flibe jets to protect chamber structures from X-ray, debris, and neutron damage. Significant progress has been made in demonstrating the ability to create and control the types of flow needed to form the protective liquid blanket. Progress has also been made on neutron shielding for the final focus magnet arrays with predicted lifetimes now exceeding the life of the power plant. Safety analyses have been completed for the HYLIFE-II design using state-of-the-art codes. Work also continues on target fabrication and injection for HIF. A target injector experiment capable of >5 Hz operation has been designed and construction will start in 2002. Methods for mass-production of hohlraum targets are being evaluated with small-scale experiments and analyses. Progress in these areas will be reviewed

  18. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    Energy Technology Data Exchange (ETDEWEB)

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projects the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.

  19. Shortening of construction period of nuclear power plant. Activities of construction industry on construction period shortening

    International Nuclear Information System (INIS)

    Kamata, Hirofumi

    2011-01-01

    Total construction period could be shorten by prefabricating structures efficiently in another yard and reducing working hours on site, which would reduce work at height or congestion work and also upgrade safety at work. Construction period shortening would surely reduce expenses during work and advance operation start of electric utilities. Construction of reactor building, turbine building, water intake and drainage canal was performed on a relatively large scale and a big share of whole schedule. This article summarized basic technologies to shorten construction period for reactor building/turbine building and water intake and drainage canal. Advanced methods of reactor building/turbine building; (1) modularization of equipment and skeleton, (2) utilization of concrete mold, reinforcing bar and steel frame, (3) precedent steel frame method and (4) steel plate reinforced concrete (SC) method, were outlined and their application examples were shown to reduce work on site and improve work efficiency. As for water intake and drainage canal construction, (1) precast concrete method, (2) SC method and (3) steel plate shell method were described with application examples. Construction procedures and problems using mega block method for water intake and drainage canal were also introduced. (T. Tanaka)

  20. Physical Exposures, Work Tasks, and OSHA-10 Training Among Temporary and Payroll Construction Workers.

    Science.gov (United States)

    Caban-Martinez, Alberto J; Santiago, Katerina M; Stillman, Jordan; Moore, Kevin J; Sierra, Danielle A; Chalmers, Juanita; Baniak, Melissa; Jordan, Melissa M

    2018-04-01

    We characterize and compare the self-reported physical exposures, work tasks, and OSHA-10 training in a non-probabilistic sample of temporary and payroll construction workers. In June 2016, a total of 250 payroll and temporary general laborers employed at Florida construction sites completed a survey at the job site as part of the falls reported among minority employees (FRAME) study. Workers employed through temp agencies (57.1%) were significantly more likely to report moving or lifting materials more than 100 pounds than payroll workers (38.5%; P < 0.01). Temporary construction workers with 10-hour OSHA training (22.2%) spent significantly less time with intense hand use/awkward hand posture than temporary workers without 10-hour OSHA training (46.9%; P = 0.048). Temp construction workers with OSHA 10-hour training reported less hazardous physical postures than workers without the same training.

  1. Progress report on fast breeder reactor development in Japan, July - September 1977

    International Nuclear Information System (INIS)

    1978-06-01

    As for the experimental fast breeder reactor ''Joyo'', the low power performance tests have been continued, and the measurements of reactor noise, the reactivity of fuel assemblies, power distribution and Na-void effect have been made. Efforts have been exerted to develop the required maintenance equipments, to manufacture the transfer rotor maintenance facilities, and to construct the spent fuel storing and cooling facilities. The analysis and calculation of the core characteristics have been in progress. The design work on the prototype fast breeder reactor ''Monju'' has been continued, and the development of the computer codes for the design has progressed. Informations have been gathered regarding the technological developments of LMFBRs overseas. The surveys on the site for ''Monju'' have been carried out. The design and research works on the demonstration reactor were started, and the general design factors such as the steam condition and the plant layout have been studied. As for the research and development of reactor physics, structural components, instrumentation and control, sodium technology, fuel materials, structural materials, safety, and steam generators, the progresses are reported in detail. High performance neutron detectors for nuclear instrumentation have been under development, and the tagging gas method for fuel failure detection and location system has been tested. (Kako, I.)

  2. Farewell Editorial The MMJ: A work in glowing progress

    African Journals Online (AJOL)

    On the social media front, we have an active Facebook Page, are on Twitter, and have a blog (which is in need of revamping). ... The 2015 African Journal Partnership Project Meeting in Malawi: Continental progress via continental breakfasts ...

  3. Item Construction Using Reflective, Formative, or Rasch Measurement Models: Implications for Group Work

    Science.gov (United States)

    Peterson, Christina Hamme; Gischlar, Karen L.; Peterson, N. Andrew

    2017-01-01

    Measures that accurately capture the phenomenon are critical to research and practice in group work. The vast majority of group-related measures were developed using the reflective measurement model rooted in classical test theory (CTT). Depending on the construct definition and the measure's purpose, the reflective model may not always be the…

  4. Mitigating delay and non-payment in the Malaysian construction industry

    Science.gov (United States)

    Mohamad, N.; Suman, A. S.; Harun, H.; Hashim, H.

    2018-02-01

    Construction industry is one of the industries that have contributed towards the rapid growth of development and economics in Malaysia. However, the industry is inundated with delay and non-payment issues between the two parties in contract that is the clients and contractors Even though there are contractual and administrative provisions in the standard forms of contract in Malaysia regarding payments, delay and non-payment issues still occur between them. The aim of the study is to develop measures to mitigate delay and non-payment issues between contractors and clients in the Malaysian construction industry. Questionnaire survey was conducted with clients and contractors in Klang Valley. Results from data analysis identified significant measures to mitigate delay and non-payment issues between contractors and clients which include contractors should submit their progress work invoicing with adequate documents; contractors should follow up constantly with client regarding payment; proper understanding of requirements with regards to payment; mutual discussion of problems with client to address problems in a timely manner and proper use of payment provisions in the standard form of contract. This study is significant to contractors and clients and to other construction players in order to reduce and minimise delay and non-payment issues for the growth of economy in the Malaysian construction industry.

  5. A Model Suggestion to Predict Leverage Ratio for Construction Projects

    Directory of Open Access Journals (Sweden)

    Özlem Tüz

    2013-12-01

    Full Text Available Due to the nature, construction is an industry with high uncertainty and risk. Construction industry carries high leverage ratios. Firms with low equities work in big projects through progress payment system, but in this case, even a small negative in the planned cash flows constitute a major risk for the company.The use of leverage, with a small investment to achieve profit targets large-scale, high-profit, but also brings a high risk with it. Investors may lose all or the portion of the money. In this study, monitoring and measuring of the leverage ratio because of the displacement in cash inflows of construction projects which uses high leverage and low cash to do business in the sector is targeted. Cash need because of drifting the cash inflows may be seen due to the model. Work should be done in the early stages of the project with little capital but in the later stages, rapidly growing capital need arises.The values obtained from the model may be used to supply the capital held in the right time by anticipating the risks because of the delay in cashflow of construction projects which uses high leverage ratio.

  6. The 1987-1988 progress report of the CEA-Euratom Association Research Laboratory

    International Nuclear Information System (INIS)

    1989-05-01

    The progress report of the CEA-Euratom Association Research Group, concerning 1987 and 1988 activities, is presented. The report involves the work carried out for assembling the Tore Supra system. The different components and the operating modes are described. The report includes: the Tore Supra construction and running, theoretical work, numerical calculations and results, the tritium technology, safety studies, supraconductors and bobbins. The Tore Supra contributions to the JET program are given [fr

  7. Demographic, psychometric, and case progression information as predictors of return-to-work in teachers undergoing occupational rehabilitation.

    Science.gov (United States)

    Young, A E; Russell, J

    1995-12-01

    Occupational stress is a significant problem and is of particular concern for educational organizations. It was the aim of the current project to identify variables that could predict return-to-work outcomes in a group of teachers who had taken leave for a work-related stress condition. Demographic, psychometric, and case progression data were collected for 119 teachers who had taken Workers' Compensation Leave and were participating in a rehabilitation program. The participants' return to work outcomes were followed-up at least 12 months after they initially left their workplace. Hierarchical discriminant function analysis indicated that 84.62% of the cases could be correctly classified as either "returning to work" or "not returning to work due to illness." The main predictor variables were: if the individual had attempted to return to work within 505 days of injury, the individual's health behaviors, the sex of the individual, and the type of school in which he or she was employed (primary or secondary). It is suggested that the derived model could be further developed and used to predict return to work from stress-related illnesses.

  8. Analysis and research of influence factors ranking of fuzzy language translation accuracy in literary works based on catastrophe progression method

    Directory of Open Access Journals (Sweden)

    Wei Dong

    2017-02-01

    Full Text Available This paper researches the problem of decline in translation accuracy caused by language “vagueness” in literary translation, and proposes to use the catastrophe model for importance ranking of various factors affecting the fuzzy language translation accuracy in literary works, and finally gives out the order of factors to be considered before translation. The multi-level evaluation system can be used to construct the relevant catastrophe progression model, and the normalization formula can be used to calculate the relative membership degree of each system and evaluation index, and make evaluation combined with the evaluation criteria table. The results show that, in the fuzzy language translation, in order to improve the translation accuracy, there is a need to consider the indicators ranking: A2 fuzzy language context → A1 words attribute → A3 specific meaning of digital words; B2 fuzzy semantics, B3 blur color words → B1 multiple meanings of words → B4 fuzzy digital words; C3 combination with context and cultural background, C4 specific connotation of color words → C1 combination with words emotion, C2 selection of words meaning → C5 combination with digits and language background.

  9. Prototype Development of an ICT System to Support Construction Management Based on Virtual Models and RFID

    DEFF Research Database (Denmark)

    Sørensen, Kristian Birch; Christiansson, Per; Svidt, Kjeld

    2009-01-01

    early example) of an ICT system was carried out to identify and formalise user needs in relation to construction management based on virtual models and radio frequency identification (RFID). The prototype was developed to support working processes in real-time project progress management, quality...

  10. Strategies to reduce safety violations for working from heights in construction companies: study protocol for a randomized controlled trial

    NARCIS (Netherlands)

    van der Molen, Henk F.; Frings-Dresen, Monique H. W.

    2014-01-01

    Safety measures should be applied to reduce work-related fatal and non-fatal fall injuries. However, according to the labor inspectorate, more than 80% of Dutch construction sites violate safety regulations for working from heights. To increase compliance with safety regulations, employers and

  11. Experience in applying quality assurance to civil construction work on the Heysham site

    International Nuclear Information System (INIS)

    Wise, D.L.

    1985-01-01

    A comparison of the civil construction works experience on Heysham I nuclear power plant with that of Heysham II following the introduction of a quality system provided on insight into the benefits resulting from quality assurance. These included: improved administration, better identification of responsibility and improved communications, improved pre-planning, better records, and greater control over activities with Suppliers and Sub-contractors. For Heysham II the full benefits of quality assurance were realised by integrating it into the management system and through the practical understanding achieved with the Client. (U.K.)

  12. Work-to-family spillover and fruit and vegetable consumption among construction laborers.

    Science.gov (United States)

    Devine, Carol M; Stoddard, Anne M; Barbeau, Elizabeth M; Naishadham, Deepa; Sorensen, Glorian

    2007-01-01

    Spillover is the effect of one role on another as working adults attempt to integrate demands from work and family. We conducted a survey to understand how worker, job, and family characteristics were related to negative work-to-family spillover and how spillover was related to fruit and vegetable consumption to inform intervention design. A combined mail and telephone survey. A national random sample in the United States. 1108 (44% response) unionized construction laborers. Personal characteristics, job factors, family factors, work-to-family spillover, and fruit and vegetable consumption. Multivariable logistic and least-squares regression. A range of 20% to 50% of respondents reported negative work-to-family spillover, agreeing that work demands, time, fatigue, and stress interfered with family meals or food choices. Higher spillover was associated with job factors, being of white race/ethnicity, and having children at home. Lower fruit and vegetable consumption was associated with higher work-to-family spillover (p = .002), being of white race or ethnicity (p working the graveyard or day shift (p = .02). Negative experience of work-to-family spillover may link employment to fruit and vegetable consumption and thus to worker health. Understanding the contribution of spillover to fruit and vegetable consumption aids understanding of how work experience affects health.

  13. Safety in construction industry

    International Nuclear Information System (INIS)

    Khan, A.M.

    1979-01-01

    Causative factors of accidents in construction industry in the context of experience of construction work of the Rajasthan Atomic Power Project are enumerated. The aspect of accident cost - direct and indirect - is discussed briefly. Setting up of a safety set-up at construction sites is emphasized and principles which should guide the accident prevention programme are spelt out. (M.G.B.)

  14. Measuring production loss due to health and work environment problems: construct validity and implications.

    Science.gov (United States)

    Karlsson, Malin Lohela; Bergström, Gunnar; Björklund, Christina; Hagberg, Jan; Jensen, Irene

    2013-12-01

    The aim was to validate two measures of production loss, health-related and work environment-related production loss, concerning their associations with health status and work environment factors. Validity was assessed by evaluating the construct validity. Health problems related and work environment-related problems (or factors) were included in separate analyses and evaluated regarding the significant difference in proportion of explained variation (R) of production loss. health problems production loss was not found to fulfill the criteria for convergent validity in this study; however, the measure of work environment-related production loss did fulfill the criteria that were set up. The measure of work environment-related production loss can be used to screen for production loss due to work environment problems as well as an outcome measure when evaluating the effect of organizational interventions.

  15. Dosimetry of radium equivalent in construction material of brick works in Sao Jose do Sabugi City - Paraiba, Brazil

    International Nuclear Information System (INIS)

    Araujo, Eduardo Eudes Nobrega de; Santos Junior, Jose Araujo dos; Amaral, Romilton dos Santos; Santos, Josineide Marques do Nascimento; Spacov, Isabel Cristina Guerra; Fernandez, Zahily Herrero

    2015-01-01

    The earth's crust has in its composition the Naturally Occurring Radioactive Material (NORM) that may have increased concentration due to activities of exploration and extraction of environmental resources. The civil construction is an economic activity that requires the use of much of the natural resources, such as the raw material of brick works, like clays, mainly used for the production of bricks and tiles. These construction materials may contain high levels of natural radioactive elements, even with concentrations higher than the limits established, given that the levels vary according to the composition of rocks and soil, due to the geological formation and may result in increased exposure of humans to natural radioactive activities. In this context, the radioecological dosimetry is defined in terms of Radium Equivalent activity (Ra eq ), that ensure radiometric conditions for the use of material derived from clays before its final application in housing construction, an initiative that ensures the radioecological safety of population. Thus, this study aimed to establish the calculation of Ra eq in the raw material of brick works located in Sao Jose do Sabugi city, state of Paraiba, in an area adjacent to the uranium deposits of Espinharas, to estimate the risks associated with primordial radionuclides attributed to TENORM activities (Technologically Enhanced Naturally Occurring Radioactive Materials) from the extraction and use of clay as a raw material in the manufacture of bricks and tiles. Analyses were performed by High Resolution Gamma Spectrometry, with HPGe-Be detector, assuming the state of secular radioactive equilibrium. The results ranged from 183.2 to 747.78 Bq/kg, with an average of 494.6 Bq/kg which exceeded the limit of 370 Bq/kg established by UNSCEAR for construction materials. Some samples obtained values exceeded by up the double this limit, suggesting control and radiometric certification for application of this material. (author)

  16. Dosimetry of radium equivalent in construction material of brick works in Sao Jose do Sabugi City - Paraiba, Brazil

    Energy Technology Data Exchange (ETDEWEB)

    Araujo, Eduardo Eudes Nobrega de; Santos Junior, Jose Araujo dos; Amaral, Romilton dos Santos; Santos, Josineide Marques do Nascimento; Spacov, Isabel Cristina Guerra; Fernandez, Zahily Herrero, E-mail: eduardo.eudes@ufpe.br, E-mail: jaraujo@ufpe.br, E-mail: romilton@ufpe.br, E-mail: neideden@hotmail.com, E-mail: isabelspacov@gmail.com, E-mail: zahily1985@gmail.com [Universidade Federal de Pernambuco (UFPE), Recife, PE (Brazil). Departamento de Energia Nuclear. Grupo de Radioecologia

    2015-07-01

    The earth's crust has in its composition the Naturally Occurring Radioactive Material (NORM) that may have increased concentration due to activities of exploration and extraction of environmental resources. The civil construction is an economic activity that requires the use of much of the natural resources, such as the raw material of brick works, like clays, mainly used for the production of bricks and tiles. These construction materials may contain high levels of natural radioactive elements, even with concentrations higher than the limits established, given that the levels vary according to the composition of rocks and soil, due to the geological formation and may result in increased exposure of humans to natural radioactive activities. In this context, the radioecological dosimetry is defined in terms of Radium Equivalent activity (Ra{sub eq}), that ensure radiometric conditions for the use of material derived from clays before its final application in housing construction, an initiative that ensures the radioecological safety of population. Thus, this study aimed to establish the calculation of Ra{sub eq} in the raw material of brick works located in Sao Jose do Sabugi city, state of Paraiba, in an area adjacent to the uranium deposits of Espinharas, to estimate the risks associated with primordial radionuclides attributed to TENORM activities (Technologically Enhanced Naturally Occurring Radioactive Materials) from the extraction and use of clay as a raw material in the manufacture of bricks and tiles. Analyses were performed by High Resolution Gamma Spectrometry, with HPGe-Be detector, assuming the state of secular radioactive equilibrium. The results ranged from 183.2 to 747.78 Bq/kg, with an average of 494.6 Bq/kg which exceeded the limit of 370 Bq/kg established by UNSCEAR for construction materials. Some samples obtained values exceeded by up the double this limit, suggesting control and radiometric certification for application of this material

  17. Progress in NCSX and QPS design and construction

    International Nuclear Information System (INIS)

    Reiersen, W.; Heitzenroeder, P; Neilson, G.H.; Zarnstorff, M.; Brown, T.; Chrzanowski, J.; Schmidt, J.; Strykowsky, R.; Viola, M.; Nelson, B.; Cole, M.; Fogarty, P.; Goranson, P.; Lyon, J.; Williamson, D.

    2005-01-01

    The National Compact Stellarator Experiment (NCSX) is being constructed at the Princeton Plasma Physics Laboratory (PPPL) in partnership with the Oak Ridge National Laboratory (ORNL). The stellarator core is designed to produce a compact 3-D plasma that combines stellarator and tokamak physics advantages. The engineering challenges of NCSX stem from its complex geometry. From the project's start in April, 2003 to September, 2004, the fabrication specifications for the project's two long-lead components, the modular coil winding forms and the vacuum vessel, were developed. An industrial manufacturing R and D program refined the processes for their fabrication as well as production cost and schedule estimates. The project passed a series of reviews and established its performance baseline with the Department of Energy. In September, 2004, fabrication was approved and contracts for these components were awarded. The suppliers have completed the engineering and tooling preparations and are in production. Meanwhile, the project completed preparations for winding the coils at PPPL by installing a coil manufacturing facility and developing all necessary processes through R and D. The main activities for the next two years will be component manufacture, coil winding, and sub-assembly of the vacuum vessel and coil subsets. Machine sector sub-assembly, machine assembly, and testing will follow, leading to First Plasma in July, 2009. The Quasi-Poloidal Stellarator Experiment (QPS) is an experiment to explore the quasi-poloidal approach to compact stellarators. It will be constructed at ORNL and is a partnership between PPPL, ORNL, and the University of Tennessee. The coil design is very similar to NCSX, but QPS has a smaller aspect ratio and will have an external vacuum vessel. Activities for the next year will focus on R and D, including completion of a prototype modular coil. Detailed design will start in 2007 and the first plasma is expected by 2011. Research supported by

  18. Nuclear power plants. Construction status report, data as of June 30, 1977. Data for decisions

    International Nuclear Information System (INIS)

    1977-07-01

    The report is designed to provide the necessary information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of the 92 plants authorized to engage in construction activities is summarized. This total includes 4 plants with construction exemptions, and 18 plants with Limited Work Authorization Permits

  19. Studies on Labour Safety in Construction Sites

    Directory of Open Access Journals (Sweden)

    S. Kanchana

    2015-01-01

    Full Text Available Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites.

  20. Studies on Labour Safety in Construction Sites

    Science.gov (United States)

    Kanchana, S.; Sivaprakash, P.; Joseph, Sebastian

    2015-01-01

    Construction industry has accomplished extensive growth worldwide particularly in past few decades. For a construction project to be successful, safety of the structures as well as that of the personnel is of utmost importance. The safety issues are to be considered right from the design stage till the completion and handing over of the structure. Construction industry employs skilled and unskilled labourers subject to construction site accidents and health risks. A proper coordination between contractors, clients, and workforce is needed for safe work conditions which are very much lacking in Indian construction companies. Though labour safety laws are available, the numerous accidents taking place at construction sites are continuing. Management commitment towards health and safety of the workers is also lagging. A detailed literature study was carried out to understand the causes of accidents, preventive measures, and development of safe work environment. This paper presents the results of a questionnaire survey, which was distributed among various categories of construction workers in Kerala region. The paper examines and discusses in detail the total working hours, work shifts, nativity of the workers, number of accidents, and type of injuries taking place in small and large construction sites. PMID:26839916

  1. A suggested color scheme for reducing perception-related accidents on construction work sites.

    Science.gov (United States)

    Yi, June-seong; Kim, Yong-woo; Kim, Ki-aeng; Koo, Bonsang

    2012-09-01

    Changes in workforce demographics have led to the need for more sophisticated approaches to addressing the safety requirements of the construction industry. Despite extensive research in other industry domains, the construction industry has been passive in exploring the impact of a color scheme; perception-related accidents have been effectively diminished by its implementation. The research demonstrated that the use of appropriate color schemes could improve the actions and psychology of workers on site, thereby increasing their perceptions of potentially dangerous situations. As a preliminary study, the objects selected by rigorous analysis on accident reports were workwear, safety net, gondola, scaffolding, and safety passage. The colors modified on site for temporary facilities were adopted from existing theoretical and empirical research that suggests the use of certain colors and their combinations to improve visibility and conspicuity while minimizing work fatigue. The color schemes were also tested and confirmed through two workshops with workers and managers currently involved in actual projects. The impacts of color schemes suggested in this paper are summarized as follows. First, the color schemes improve the conspicuity of facilities with other on site components, enabling workers to quickly discern and orient themselves in their work environment. Secondly, the color schemes have been selected to minimize the visual work fatigue and monotony that can potentially increase accidents. Copyright © 2011 Elsevier Ltd. All rights reserved.

  2. Analisis Kecelakaan Kerja Pada Proyek Bangunan Gedung (Analysis of Work Accident on Building Construction Projects)

    OpenAIRE

    Ferdiansyah, Deni; Winarno, Setya; M, Faisol A

    2009-01-01

    Work accidents and fatalities often happen in construction industry, thus a study on this matter to promote safety management needs a thorough analysis of their elements. The purpose of this paper is to identify various types of accidents, cost of accident and insurance premium, and also the correlation between the types of accidents and their costs. The data was collected from thirty construction projects around Daerah Istimewa Yogyakarta province and surrounding areas. These data included t...

  3. Construction techniques and working principles of external cathode Geiger-Mueller counters

    International Nuclear Information System (INIS)

    Sevegnani, Francisco Xavier

    1996-01-01

    In this paper, the construction technique and working principles of the external cathode Geiger-Mueller counter are described in detail. During the analysis of the behavior of these counters a new phenomena was observed, related to an increase int he background rate with the applied voltage. The experiments have also shown that the pulse amplitude of those counters decreases exponentially with the counting rate. The counters built with the techniques described in this paper has shown plateaus of about 1400 V with slope of 0,8%/100 V. (author)

  4. Single, childless working women's construction of wellbeing: On balance, being dynamic and tensions between them.

    Science.gov (United States)

    Engler, Kim; Frohlich, Katherine; Descarries, Francine; Fernet, Mylène

    2011-01-01

    Single, childless working women (SCWW) are a notable proportion of the female workforce. The budding research on this population suggests that they have issues of wellbeing that may be tied to specific needs of both their workplaces and their personal lives, and hence, distinct work-life dynamics that require attention. This study explores how SCWW construct their wellbeing. The sample was composed of 22 SCWW aged 29 to 45. A discourse analysis of the transcripts of semi-structured interviews with these women was performed. Most women drew on an interpretative repertoire of "wellbeing as balance" (e.g., diversification and reasonable dosing of life's dimensions). It was associated with a recurrent subject position we have termed "the dynamic woman" whose intensity transfused talk of the activities in her life. Here, work becomes a "passion" and a source of appreciated challenges. However, a dilemma could arise from these constructions for positioning oneself in relation to the cadence of one's active life or rather, in articulating an unambiguous claim to balance. Balance/dosing and dynamicity/passion can be uneasy bedfellows. Our analyses raise questions about possible counter[balancing] discourses and further argue the relevance of work-life issues for SCWW.

  5. Research on university culture construction in the view of ecological idea

    OpenAIRE

    Wang Xinggang; Jia Mingwei; Peng Chenggang

    2016-01-01

    With the progress of times, our spiritual pursuit becomes higher and higher, and it is especially true among modern youth. Therefore, establishment of university culture has gradually become the focus of attention. This paper firstly quantized university culture construction into four parts: material culture construction, spiritual culture construction, system culture construction, and behavioral culture construction. It then analogized each part as one population in ecological system; establ...

  6. Modeling system for the rapid construction in Syria

    Directory of Open Access Journals (Sweden)

    Ahmed, Sonia

    2016-06-01

    Full Text Available Prefabrication is a manufacturing process conducted at a specialized facility, in which various materials are joined to form a component part of the final installation. Prefabrication techniques have been progressively adopted in the construction industry in various countries. The demand was at its peak in the early 1970s in Eastern and Western Europe for the construction of new towns. Worldwide, the highest precast levels in 1996 were located in Denmark (43%, the Netherlands (40%, Sweden and Germany (31%. In Asia, the precast levels in Japan and Singapore were about 15% and 8%, respectively, recently, the use of prefabrication is further encouraged to increase productivity and build ability. In Syria too, the first residential project in Damascus: the establishment of 2400 housing units in the year (77-80. Except that the rate of construction pre-cast in Syria is still not exceed 2% of Building of reinforced concrete. In order to participate in the reconstruction of Syria, after the destruction and devastation caused by the war over four years, this search evaluates successful international experiences in rapid construction technique, and modeled system that could serve the current Syrian reality. Introduction of this technology as a new method in the world of construction in Syria requires a good base, relying on the availability of the necessary raw materials and nearness of work site, as well as the need to replace old technology into modern technology, and analyzing the economic, social, environmental criteria, to make the decision about the best solution. Cost and time will form the most important indicators that will be analyzed and calculated, before the final model mode, in order to be able to use this system later in Syrian construction companies.

  7. How personal resources predict work engagement and self-rated performance among construction workers: a social cognitive perspective.

    Science.gov (United States)

    Lorente, Laura; Salanova, Marisa; Martínez, Isabel M; Vera, María

    2014-06-01

    Traditionally, research focussing on psychosocial factors in the construction industry has focused mainly on the negative aspects of health and on results such as occupational accidents. This study, however, focuses on the specific relationships among the different positive psychosocial factors shared by construction workers that could be responsible for occupational well-being and outcomes such as performance. The main objective of this study was to test whether personal resources predict self-rated job performance through job resources and work engagement. Following the predictions of Bandura's Social Cognitive Theory and the motivational process of the Job Demands-Resources Model, we expect that the relationship between personal resources and performance will be fully mediated by job resources and work engagement. The sample consists of 228 construction workers. Structural equation modelling supports the research model. Personal resources (i.e. self-efficacy, mental and emotional competences) play a predicting role in the perception of job resources (i.e. job control and supervisor social support), which in turn leads to work engagement and self-rated performance. This study emphasises the crucial role that personal resources play in determining how people perceive job resources by determining the levels of work engagement and, hence, their self-rated job performance. Theoretical and practical implications are discussed. © 2014 International Union of Psychological Science.

  8. Kaisten exploration well. Civil construction work, environemntal protection and drilling techniques

    International Nuclear Information System (INIS)

    Anon.

    1986-02-01

    The exploration well at Kaisten was realized as the fifth well within the Nagra Deep Drilling Program in Northern Switzerland. The drilling work was startet February 13, 1984. Having reached the final depth of 1305.8 m on June 27, 1984, the test phase was initiated and completed by May 3, 1985. The well drilled approx. 300 m of sediments and approx. 1000 m of crystalline rock. Oriented cores were taken over the whole length of the well. The present report presents the drilling activities, civil construction work related to the site and precautions taken to account for environmental protection aspects. A chapter dealing with the commission representing members of the federal, cantonal and local authorities and about reporting is given at the end of this report. (author)

  9. Understanding socioeconomic aspects of risk perception: Progress report, FY-1987: Working draft

    International Nuclear Information System (INIS)

    Liebow, E.B.; Fawcett-Long, J.A.; Terrill, E.S.

    1987-11-01

    This report summarizes progress to date in understanding the issue of risk perception and its implications for the suitability of the Hanford Site in eastern Washington as a location for an underground radioactive waste repository. It presents some observations about the causes, consequences and processes of risk perception gained from a review of the professional literature. It also contains an extensive working bibliography of useful reference materials, and a compilation of abstracts from selected articles that are felt to be of particular relevance to the BWIP licensing and institutional support efforts. 293 refs

  10. Discourses of Volunteer/Service Work and Their Discontents: Border Crossing, Construction of Hierarchy, and Paying Dues

    Science.gov (United States)

    Doerr, Neriko Musha

    2017-01-01

    This article examines four discourses of volunteer/service work--charity, leisure, citizenship, and border crossing--in terms of how they construct relationships between those who serve and those who are served. Specifically, it analyzes the discourse of border crossing, which assumes White middle-class students crossing a border to work in…

  11. Labor productivity adjustment factors. A method for estimating labor construction costs associated with physical modifications to nuclear power plants

    International Nuclear Information System (INIS)

    Riordan, B.J.

    1986-03-01

    This report develops quantitative labor productivity adjustment factors for the performance of regulatory impact analyses (RIAs). These factors will allow analysts to modify ''new construction'' labor costs to account for changes in labor productivity due to differing work environments at operating reactors and at reactors with construction in progress. The technique developed in this paper relies on the Energy Economic Data Base (EEDB) for baseline estimates of the direct labor hours and/or labor costs required to perform specific tasks in a new construction environment. The labor productivity cost factors adjust for constraining conditions such as working in a radiation environment, poor access, congestion and interference, etc., which typically occur on construction tasks at operating reactors and can occur under certain circumstances at reactors under construction. While the results do not portray all aspects of labor productivity, they encompass the major work place conditions generally discernible by the NRC analysts and assign values that appear to be reasonable within the context of industry experience. 18 refs

  12. Progressive decrease of melatonin production over consecutive days of simulated night work.

    Science.gov (United States)

    Dumont, Marie; Paquet, Jean

    2014-12-01

    Decreased melatonin production, due to nighttime exposure to light, has been proposed as one of the physiological mechanisms increasing cancer risk in night workers. However, few studies measured melatonin production in night workers, and most of these studies did not measure melatonin over 24 h. One study compared total melatonin production between day and night shifts in rotating night workers and did not find significant differences. However, without baseline measures, it was not possible to exclude that melatonin production was reduced during both day and night work. Here, we used data collected in a simulation study of night work to determine the effect of night work on both nighttime and 24-h melatonin production, during three consecutive days of simulated night work. Thirty-eight healthy subjects (15 men, 23 women; 26.6 ± 4.2 years) participated in a 6-d laboratory study. Circadian phase assessments were made with salivary dim light melatonin onset (DLMO) on the first and last days. Simulated day work (09:00-17:00 h) occurred on the second day, followed by three consecutive days of simulated night work (00:00-08:00 h). Light intensity at eye level was set at 50 lux during both simulated day and night work. The subjects were divided into three matched groups exposed to specific daytime light profiles that produced various degrees of circadian phase delays and phase advances. Melatonin production was estimated with the excretion of urinary 6-sulfatoxymelatonin (aMT6s). For the entire protocol, urine was collected every 2 h, except for the sleep episodes when the interval was 8 h. The aMT6s concentration in each sample was multiplied by the urine volume and then added to obtain total aMT6s excretion during nighttime (00:00-08:00 h) and during each 24-h day (00:00-00:00 h). The results showed that melatonin production progressively decreased over consecutive days of simulated night work, both during nighttime and over the 24 h. This

  13. Exploitation and Benefits of BIM in Construction Project Management

    Science.gov (United States)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  14. Safety in construction industry - overview

    International Nuclear Information System (INIS)

    Chockalingam, S.; Nehru, R.M.; Ramprasad, K.; Sonawane, A.U.

    2016-01-01

    The construction industry plays an important role in the social and economic development in a country. Safety in the construction industry is considered a major issue in developed and developing countries. In urban sector of India increasing numbers of workers have taken up construction work as a means of immediate employment, which provides cash earnings at the end of the day. Being as unorganized sector, the fatal injuries in DAE unit for the construction industry (Nuclear Power Project including BHAVINI: 62.7% from 1999 to 2014) is higher than the category for all other units (UCIL:13.3%; ECIL:6.7%; NFC and ZC: 4%; HWP: 2.7%; IREL:2.7%; Nuclear Power Plant: 2.7% etc., from 1999 to 2014). A variety hazards exist in the construction site. The best way to protect workers against workers against hazards is to control problems at the source. The problem regarding construction industry is not that the hazards and risks are unknown, but it very difficult to accurately identify in a constantly changing work environment. To prevent hazards at work, all possible hazards that may be encountered should be identified in advance through Job Hazard Analysis (JHA). The present scenario has deduced a fact that efficient Safety Management Techniques (SMT) are (essential for today's construction companies and adaptation of legal requirements including regulatory requirements and proactive safety management techniques will help organizations in providing a better workplace to its employees and reduce the accidents. (author)

  15. Constructing the truth: from 'confusion of tongues' to 'constructions in analysis'.

    Science.gov (United States)

    Press, Jacques

    2006-04-01

    The author hypothesizes that the papers Freud wrote in the period 1934-9 constitute a final turning point in his work resulting from an attempt to work through, by means of self-analysis, early traumatic elements reactivated by the conditions of his life in the 1930s. The author emphasizes that the ups and downs of Freud's relationship with Sándor Ferenczi and the mourning which followed his death in 1933 played an important role in this traumatic situation. He suggests that through these last works, Freud pursued a posthumous dialogue with Ferenczi. This working through led Freud, in Moses and monotheism, to an ultimate revision of his theory of trauma, a revision which the author examines in full, in the light of the works of the Egyptologist, Jan Assmann. A new analytical paradigm emerges: that of constructions in analysis developed in the article of the same name. The activity of construction appears as an alternative to the mutual analysis proposed by Ferenczi and is closely bound up with the notion of historical truth. In psychoanalysis, it would mean constructing a historical truth whose anchoring in the material truth of the past is essential, though it should not be confused with it.

  16. Constructing Family from a Social Work Perspective in Child Welfare: A Juggling Act at Best

    Directory of Open Access Journals (Sweden)

    Randy Johner

    2017-04-01

    Full Text Available The transformative reality of diverse Canadian families is outpacing national and provincial statutes and policies. Social workers in child welfare agencies are faced with the complex task of making decisions about families while working within the confines of national/provincial statutes and social policies, as well as within agency structures. They attempt to balance the rights of diverse Canadian families and still protect children at risk of harm with the principle of the ‘best interest of the child’. The purpose of this qualitative case study was to explore the construction of ‘family’ and decisions about family life in protection services from the perspective of professional social workers in the prairie region of Canada. Social workers from several urban communities were invited to participate in focus groups. During the focus group discussions, themes of social worker’s nuanced and somewhat fluid understandings of family did not always converge with current legal and professional notions of families. Study findings suggest that social workers’ construction of family and the decisions they make about family life involve three primary themes: ‘acceptance of diverse understandings of family’; ‘safety and the best interest of the child’, and ‘professional discretionary decisions’This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

  17. Present status of refining and conversion facility dismantling. Progress in first half of 2010FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2011-06-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  18. Present status of refining and conversion facility dismantling. Progress in first half of 2009FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2010-03-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in first half year of 2009FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  19. Present status of refining and conversion facility dismantling. Progress in latter half of 2008FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Takahashi, Nobuo; Tokuyasu, Takashi

    2010-01-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008, and all equipments in radiation controlled area will be dismantled by the 2011 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2008FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room/each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  20. Nuclear power plant construction activity, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors

  1. The progressive tax

    OpenAIRE

    Estrada, Fernando

    2010-01-01

    This article describes the argumentative structure of Hayek on the relationship between power to tax and the progressive tax. It is observed throughout its work giving special attention to two works: The Constitution of Liberty (1959) and Law, Legislation and Liberty, vol3; The Political Order of Free People, 1979) Hayek describes one of the arguments most complete information bout SFP progressive tax systems (progressive tax). According to the author the history of the tax progressive system...

  2. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    Science.gov (United States)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  3. Can we improve the clinical assessment of working memory? An evaluation of the Wechsler Adult Intelligence Scale-Third Edition using a working memory criterion construct.

    Science.gov (United States)

    Hill, B D; Elliott, Emily M; Shelton, Jill T; Pella, Russell D; O'Jile, Judith R; Gouvier, W Drew

    2010-03-01

    Working memory is the cognitive ability to hold a discrete amount of information in mind in an accessible state for utilization in mental tasks. This cognitive ability is impaired in many clinical populations typically assessed by clinical neuropsychologists. Recently, there have been a number of theoretical shifts in the way that working memory is conceptualized and assessed in the experimental literature. This study sought to determine to what extent the Wechsler Adult Intelligence Scale-Third Edition (WAIS-III) Working Memory Index (WMI) measures the construct studied in the cognitive working memory literature, whether an improved WMI could be derived from the subtests that comprise the WAIS-III, and what percentage of variance in individual WAIS-III subtests is explained by working memory. It was hypothesized that subtests beyond those currently used to form the WAIS-III WMI would be able to account for a greater percentage of variance in a working memory criterion construct than the current WMI. Multiple regression analyses (n = 180) revealed that the best predictor model of subtests for assessing working memory was composed of the Digit Span, Letter-Number Sequencing, Matrix Reasoning, and Vocabulary. The Arithmetic subtest was not a significant contributor to the model. These results are discussed in the context of how they relate to Unsworth and Engle's (2006, 2007) new conceptualization of working memory mechanisms.

  4. [Chemistry for sustainable construction: 20 years of progress].

    Science.gov (United States)

    Leoni, R

    2012-01-01

    Sustainable development is based on three pillars, economic, social and environmental development. Sustainable products can be developed only by companies that grow on these pillars, but in building sustainability is often identified only with the reduction of dangerous synthetic substances. From this point of view, the efforts of the construction chemicals industry have focused on reducing emissions, dust and volatile organic compounds (VOCs), replacing, if technically possible, the most dangerous components, such as formaldehyde, phthalates, and chlorinated or aromatic solvents, and developing water-borne products with very low VOC emissions. Differences in the definition of VOC and in the methods of measurement of emissions, however, make it difficult to choose the safest product and grows in the construction industry the need to reference trusted standards and product certifications to guarantee users. At present, products labeled "bio", "eco" or "solvent free" do not necessarily mean safe products.

  5. Working Memory, Attention Control, and the N-Back Task: A Question of Construct Validity

    Science.gov (United States)

    Kane, Michael J.; Conway, Andrew R. A.; Miura, Timothy K.; Colflesh, Gregory J. H.

    2007-01-01

    The n-back task requires participants to decide whether each stimulus in a sequence matches the one that appeared n items ago. Although n-back has become a standard "executive" working memory (WM) measure in cognitive neuroscience, it has been subjected to few behavioral tests of construct validity. A combined experimental-correlational study…

  6. An Approach for Measuring Reductions in Operations, Maintenance, and Energy Costs: Baseline Measures of Construction Industry Practices for the National Construction Goals.

    Science.gov (United States)

    Chapman, Robert E.; Rennison, Roderick

    The Construction and Building Subcommittee of the National Science and Technology Council (NSTC) has established seven National Construction Goals for the construction industry and is developing baseline measures for current practices and progress with respect to each goal. This document provides a detailed set of baseline measures for the NSTC…

  7. Integrating building information modeling and health and safety for onsite construction.

    Science.gov (United States)

    Ganah, Abdulkadir; John, Godfaurd A

    2015-03-01

    Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication. In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners. The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel. From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite.

  8. Characterizing of steel used in the construction of civil works in Almeria

    International Nuclear Information System (INIS)

    Senobua, A. J.; Garzon, E.; Ayuso, J.; Perez, F.; Caballero, A.

    2003-01-01

    Various tests have been conducted on the steel bars used in the construction of civil works in Almeria (Spain) during the period 18 January 2000-7May 2001, with the aim of mechanically characterizing the different types of steel (weldable; B400S, B500S and ductile weldable: B400SD) to determine whether there is a technical reason for the increase in the use of ductile weldable steel. For this, we have used a hydraulic machine to break by traction all the test samples that arrived to the laboratory, following the specifications of the UNE 7474-1:1992 and the UNE 7474-2:1992. The results indicate that only in 86% of the cases does the steel B400SD satisfy the limits specified by the UNE 36065:1999-EX, as opposed to 95 and 94% of the B400S and B500S steels. In addition the ductile weldable steel registered mean values lower than those of B400S. This findings disagrees with expectations set by the specifications. (Author) 6 refs

  9. National evaluation of strategies to reduce safety violations for working from heights in construction companies: results from a randomized controlled trial

    NARCIS (Netherlands)

    van der Molen, Henk F.; den Herder, Aalt; Warning, Jan; Frings-Dresen, Monique H. W.

    2016-01-01

    The objective of this study is to evaluate the effectiveness of a face-to-face strategy and a direct mail strategy on safety violations while working from heights among construction companies compared to a control condition. Construction companies with workers at risk for fall injuries were eligible

  10. Welfare Reform: Progress in Meeting Work-Focused TANF Goals. Testimony before the Subcommittee on Human Resources, Committee on Ways and Means, House of Representatives.

    Science.gov (United States)

    Fagnoni, Cynthia M.

    The General Accounting Office (GAO) examined progress in meeting work-focused goals of the Temporary Assistance for Needy Families (TANF) program. The following issues were considered: (1) states' progress in implementing TANF; (2) the status of families who have left welfare; (3) the characteristics of adults currently receiving TANF; (4) states'…

  11. Recent progress in microcalorimetry

    CERN Document Server

    Calvet, E; Skinner, H A

    2013-01-01

    Recent Progress in Microcalorimetry focuses on the methodologies, processes, and approaches involved in microcalorimetry, as well as heat flow, temperature constancy, and chemistry of alumina and cements.The selection first offers information on the different types of calorimeters; measurement of the heat flow between the calorimeter and jacket boundaries by means of a thermoelectric pile; and constructional details of the microcalorimeter. Discussions focus on classification of calorimeters, use of thermoelectric piles as thermometers, correct measurement of heat flow from a calorimeter conta

  12. Development and progress of the South African uranium enrichment project

    International Nuclear Information System (INIS)

    Roux, A.J.A.; Grant, W.L.; Barbour, R.A.; Loubser, R.S.; Wannenburg, J.J.

    1977-01-01

    The earlier development of the project is briefly reviewed, and some of the salient features of the South African process are touched upon. Development of the separation element in the last 18 months is discussed, as well as further work on the helikon cascade process. A brief description of the helikon cascade operation is given by means of diagrams. Because of time limitations, the complete helikon theory is not presented, but only some examples shown. Experimental work done to verify the helikon concept, as well as theoretical treatment, is presented. A brief report of the progress made on the experimental module of 6 t/a separative work capacity is given. This module, known as Mini-Z, is well advanced and details of its features and construction are shown. A short discussion of progress on the full-scale prototype module, known as Proto-Z, is next presented. The flexibility of such a design to fit a wide range of cascade sizes is considered, as well as cost implications of various approaches to design. Apart from progress on the development of the commercial plant, a brief review is given of the present state of the pilot plant at Valindaba. Some of the information obtained is mentioned. In conclusion, some information is given in regard to further planning and other work on the commercial plant at present being undertaken. Projected operation of the plant and some nuclear fuel service aspects are touched on

  13. Delays in nuclear power plant construction. Progress report, September 15, 1976--September 14, 1977

    International Nuclear Information System (INIS)

    Mason, G.E.; Larew, R.E.

    1977-01-01

    This report identifies barriers to shortening nuclear power plant construction schedules and recommends research efforts that should minimize or eliminate the identified barriers. The identified barriers include: (1) design and construction interfacing problems; (2) problems relating to the selection and use of permanent materials and construction methods; (3) construction coordination and communication problems; and (4) problems associated with manpower availability and productivity;

  14. Progress report on fast breeder reactor development in Japan, June-March, 1979

    International Nuclear Information System (INIS)

    1979-11-01

    The experimental fast reactor ''Joyo'' started the second cycle operation of 50 MW on January 12, and finished it on February 26. The operation was very stable throughout this period. The preparation to raise the output to 75 MW has been in progress since then in parallel with the periodic inspection. Experimental fuel subassemblies and a control rod used for the 50 MW operation were removed. Installations of a fuel storage and handling facility, a water cooling and purifying plant, and an in-water cutting equipment were completed. The works related to the analysis of the core characteristics are reported. The construction preliminary design (2) of the prototype fast reactor ''Monju'' was finished. The wind tunnel experiment and the calculation of earthquake response to artificial seismic waves are being carried on. The works of developing codes and the surveys on the construction site are reported. The fourth preliminary design of the demonstration fast reactor was completed. The research and development of reactor physics, structural components, instrumentation and control, sodium technology, fuel materials, structures and structural materials, safety and steam generators are reported. The technological investigation into foreign LMFBRs was finished. (Kako, I.)

  15. Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox

    Science.gov (United States)

    Spee, Ton; Gillen, Matt; Lentz, Thomas J.; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-01-01

    Objectives This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions. PMID:22953194

  16. Review of qualitative approaches for the construction industry: designing a risk management toolbox.

    Science.gov (United States)

    Zalk, David M; Spee, Ton; Gillen, Matt; Lentz, Thomas J; Garrod, Andrew; Evans, Paul; Swuste, Paul

    2011-06-01

    This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.

  17. CORR Guidelines. Preparing and Conducting Review Missions of Construction Project Readiness for Nuclear Power Plants

    International Nuclear Information System (INIS)

    2013-01-01

    The construction readiness review (CORR) mission for nuclear power plant projects has been established with the aim of conducting peer reviews of construction projects related to nuclear power plants. Such a mission provides a detailed assessment of readiness for construction, construction progress, readiness for turnover, as well as recommendations for improvement. Organizations in Member States, such as nuclear utilities, owners, regulators and technical support organizations, can benefit from such reviews. A team of international experts with complementing specialities will conduct the CORR mission. The review is based on appropriate IAEA publications, such as IAEA Safety Standards Series Guides and IAEA Nuclear Energy Series publications, as well as on internationally recognized project and construction management guides. Mission findings are summarized in a mission report, which includes a list of recommendations, suggestions and identified good practices. The review is not intended to be a regulatory inspection or an audit against international codes and standards. Rather, it is a peer review aimed at improving implementation processes and procedures through an exchange of technical experiences and practices at the working level. The mission is applicable at any stage of a nuclear power plant construction project, although two specific phases are targeted: (1) start of construction mission (Phase 1 mission) and (2) an in-progress mission (Phase 2 mission). Missions are initiated when official requests are submitted by Member States through the appropriate IAEA channels

  18. Use of soil-cement block as an alternative to the construction of popular houses

    International Nuclear Information System (INIS)

    Azevedo, A.R.G.; Alexandre, J.; Ribeiro Junior, J. R.

    2012-01-01

    The construction industry in Brazil, after several years in decline, is currently undergoing a growing trend, which can be observed daily by the large number of construction sites around the country, whether public or private. However when it comes to developments in methods of construction sector appears that little progress was made, built in a very rudimentary compared to other countries and we still have some concerns with the new technology, whether raw materials or methods of construction, which eventually generate large waste caused by the lack of streamlining processes and increasing the cost of works in general, and in this context that this paper proposes a study of the constructive model based on the use of soil-cement masonry, which comes as an alternative more economical, with a strong environmental appeal and the growing demand for building low cost houses (ideal for this constructive model). (author)

  19. Successful verification of subcontracted work in the construction industry

    NARCIS (Netherlands)

    Makkinga, Rick; de Graaf, Robin; Voordijk, Hans

    2018-01-01

    Due to the introduction of new types of contracts, such as Design, Build, Finance, & Maintain (DBFM), a major shift in tasks and responsibilities from client to contractor can be seen in the construction industry. To manage these new contracts and corresponding shifts in responsibilities, systems

  20. Environmental monitoring of a wind park during the construction phase

    International Nuclear Information System (INIS)

    Castonguay, M.; Caron, F.

    2007-01-01

    Wind energy qualifies as green energy because of low gas emissions associated with energy production. However, in order to truly qualify as green, each phase of a wind energy project should be evaluated, including construction, the energy exploitation period, as well as the dismantling of the turbines. Environmental monitoring of wind turbine arrays during the construction and dismantling phases could reveal the environmental impact of a project. This article provided the example of a wind turbine array at l'Anse-a-Valleau, located in a forested territory on the north side of the Gaspe Peninsula along the St. Lawrence River in Quebec. The park was configured to have 67 wind turbines of 1.5 MW each, for a total of 100.5 MW. The project was evaluated at $164 million, with regional economic spending of $65.8 million. During the height of construction, the project employed 240 workers. Ten full-time jobs will be created for the operation phase, scheduled for the end of 2007. The environmental monitoring at the construction site is deemed both technical and social. Good working conditions and communication must be established between the environmental supervisor and the site manager. They must work jointly to ensure good conduct and progress of the work at the construction site. The environmental supervisor must have the necessary authority to stop work upon a breach of regulations in the deforesting phase, since 60 per cent of the territory is on public domain. Environmental monitoring also includes surveillance of the road construction, soil quality, transportation of equipment, air quality, noise pollution, and residual matter management. It was concluded that wind energy is a true form of green energy, and methods used by developers during construction demonstrate responsibility towards the environment. It was suggested that the key to success is to have good pre-planning and good communication between all parties concerned. 4 figs

  1. Eye-orbit NMR imaging: works in progress

    International Nuclear Information System (INIS)

    Cabanis, E.A.; Iba-Zizen, M.T.; Tourbah, A.; Stievenart, J.L.; Nguyen, T.H.; Trocme, P.; Mottier, N.; Thibierge, M.; Haut, J.; Hamard, H.

    1995-01-01

    Progress in brain and eyes magnetic resonance imagery follows improvements in data processing. Most of the 45000 examinations performed since 1984 concerns the head (90%) and a third of them concerns the optic system (from the cornea to the calcarine fissure). The majority of the explorations has been done with a SIGNA GE device (1.5 T, 4 and 5x versions). Image treatment is performed on Advantage Windows stations. Proton spectroscopy is becoming a major tool in myelin evaluation. The spatial resolution of bi-dimensional descriptive anatomy has increased (see for instance the ciliary body and the axonal group of the optical nerve). Problem remains in the fusion of colour or grey scale X-ray scanning images with magnetic resonance images for surface or transparency tri-dimensional analysis of regional anatomy. Dynamic ( 4 D ) anatomy of cone muscles is favourable to the comprehension of theoretical data or precise clinical situations. (J.S.)

  2. Construction techniques for containment dome shuttering work of nuclear island of fast reactor

    International Nuclear Information System (INIS)

    Qiao Shoucheng

    2008-01-01

    The difficult dome shuttering work was completed with more or less traditional construction method based on the shuttering system formed with shaped-steel belfast truss of the positioning beam, wood camber beam as keel, 50 mm-thick wood block as face plate, and fastener or bowl-buckle scaffold tool as the support, in which certain social and economic benefits were made. All these are supported by technology. (authors)

  3. Synchronization of construction, replenishment and leasing cycles with account of wave dynamics of innovation cycles in the construction and transport field

    Science.gov (United States)

    Alekseeva, Tatyana

    2017-10-01

    The article considers the contradictive nature of the basic cycles of the growth in construction, the core of which are construction cycles, replenishment cycles of the active part of fixed assets, innovation and investment cycles. All of the listed cycles objectively thwart the science and technology progress in construction. There are presented results of the study of finance leasing as an effective tool, that provides time reduction of the innovation replenishment cycle of the active part of fixed assets in construction. It takes into account the development and implementation terms of construction investment projects in order to timely support the innovation wave and enhance its efficiency in construction for a rapid transition of the construction investment complex and national economy to a new vector of growth.

  4. Constructing a working taxonomy of functional Ada software components for real-time embedded system applications

    Science.gov (United States)

    Wallace, Robert

    1986-01-01

    A major impediment to a systematic attack on Ada software reusability is the lack of an effective taxonomy for software component functions. The scope of all possible applications of Ada software is considered too great to allow the practical development of a working taxonomy. Instead, for the purposes herein, the scope of Ada software application is limited to device and subsystem control in real-time embedded systems. A functional approach is taken in constructing the taxonomy tree for identified Ada domain. The use of modular software functions as a starting point fits well with the object oriented programming philosophy of Ada. Examples of the types of functions represented within the working taxonomy are real time kernels, interrupt service routines, synchronization and message passing, data conversion, digital filtering and signal conditioning, and device control. The constructed taxonomy is proposed as a framework from which a need analysis can be performed to reveal voids in current Ada real-time embedded programming efforts for Space Station.

  5. Nuclear power plants: data for decisions. Construction status report: data as of July 31, 1977

    International Nuclear Information System (INIS)

    1977-08-01

    This management report is designed to provide the necessary information for monitoring the progress of construction of nuclear power plants. It provides data for synchronizing the licensing process with predicted fuel loading dates, as well as providing a central federal government report for commercial reactor construction. It utilizes data collected from the utilities sponsoring these projects and the Office of Inspection and Enforcement, NRC, and analyzed by the Office of Management Information and Program Control in the implementation of Management Information Systems. The status of the 91 plants authorized to engage in construction activities in Regions I thru V is summarized in this document. This total includes (4) plants with construction exemptions, and (10) plants with Limited Work Authorization Permits

  6. Recruitment criteria and attraction strategies for local trained labour in Malaysia’s construction industry

    Science.gov (United States)

    Manap, N.; Noh, NH Mohd; Syahrom, N.

    2017-12-01

    Development in Malaysia is booming which can be witnessed by the various construction projects that currently in progress, especially in the state of Johor which has the highest value of construction work completed for the third quarter of 2016. This necessarily requires skilled labours in a high number especially among the locals since it has been reported that Malaysia’s construction industry is having problems related to the shortage of local skilled labour. In addition, the local workers have been reported unable to fulfil the demand of construction market. Hence, it caused the contractor to import foreign workers to meet the needs and requirement of labour market in construction sector. This study aims of two objectives; to determine the criteria set by the construction company in recruiting local skilled labour and to study the strategies that can attract local skilled labour to join construction industry. Questionnaire has been distributed to G7 contractor in the state of Johor in order to achieve the objectives of this study. Collected data was then evaluated and tested for its reliability using the SPSS 20.0 software before it can be analysed in order to obtain the mean value, frequencies and percentage. The outcome of this study indicates that the prospective employer prefers to work with man and they require young, experienced, knowledgeable and skilled workers in doing the job. Most of the strategies that have been selected are mainly related to money namely salary increment, bonus, allowance and overtime payment, apart from upgrading labours welfare and providing a better accommodation. This study can be a guideline to both skills institution and contractor to improve on what they are lacking in order to encourage the local trained skills labour to join the industry.

  7. Perspectives of construction robots

    Science.gov (United States)

    Stepanov, M. A.; Gridchin, A. M.

    2018-03-01

    This article is an overview of construction robots features, based on formulating the list of requirements for different types of construction robots in relation to different types of construction works.. It describes a variety of construction works and ways to construct new or to adapt existing robot designs for a construction process. Also, it shows the prospects of AI-controlled machines, implementation of automated control systems and networks on construction sites. In the end, different ways to develop and improve, including ecological aspect, the construction process through the wide robotization, creating of data communication networks and, in perspective, establishing of fully AI-controlled construction complex are formulated.

  8. Construction managers' perceptions of construction safety practices in small and large firms: a qualitative investigation.

    Science.gov (United States)

    Gillen, Marion; Kools, Susan; McCall, Cade; Sum, Juliann; Moulden, Kelli

    2004-01-01

    Despite the institution of explicit safety practices in construction, there continue to be exceedingly high rates of morbidity and mortality from work-related injury. This study's purpose was to identify, compare and contrast views of construction managers from large and small firms regarding construction safety practices. A complementary analysis was conducted with construction workers. A semi-structured interview guide was used to elicit information from construction managers (n = 22) in a series of focus groups. Questions were designed to obtain information on direct safety practices and indirect practices such as communication style, attitude, expectations, and unspoken messages. Data were analyzed using thematic content analysis. Managers identified a broad commitment to safety, worker training, a changing workplace culture, and uniform enforcement as key constructs in maintaining safe worksites. Findings indicate that successful managers need to be involved, principled, flexible, and innovative. Best practices, as well as unsuccessful injury prevention programs, were discussed in detail. Obstacles to consistent safety practice include poor training, production schedules and financial constraints. Construction managers play a pivotal role in the definition and implementation of safety practices in the workplace. In order to succeed in this role, they require a wide variety of management skills, upper management support, and tools that will help them instill and maintain a positive safety culture. Developing and expanding management skills of construction managers may assist them in dealing with the complexity of the construction work environment, as well as providing them with the tools necessary to decrease work-related injuries.

  9. A study of identity construction in political discourse

    OpenAIRE

    Qaiwer, Shatha Naiyf

    2016-01-01

    This thesis interrogates the construction of identity and self-presentation strategies in the discourse of the current President of the United States of America, Barack Hussein Obama. The study seeks to answer questions about how the President constructs the various identities evident in his discourse, what kinds of resources are drawn upon, and how the resulting identities contribute to gain the support of the audience and the progression of political discourse in general. The present s...

  10. Progress report for 1984/85 from the Waste Treatment and Disposal Working Party covering joint BNFL/DOE funded work

    International Nuclear Information System (INIS)

    Claxton, D.G.S.A.

    1985-01-01

    The progress report from the waste treatment and disposal working party is concerned with the management of intermediate-level radioactive waste arising from dismantled fuel assemblies, cladding removed from fuel cans, sludges from fuel cladding corrosion, flocs from liquid waste, ion exchange resins and solid wastes generated during reprocessing. It is proposed that these wastes be incorporated in a matrix for safe transport, storage and disposal and the objectives of the study are to evaluate waste products arising from the treatment of ILWS and to develop techniques to check the quality of the finished waste product. (UK)

  11. A working definition of scenario and a method of scenario construction

    International Nuclear Information System (INIS)

    Barr, G.E.; Dunn, E.

    1992-01-01

    The event-tree method of scenario construction has been chosen for the Yucca Mountain performance assessment. Its applicability and suitability to the problem are discussed and compared with those of the Nuclear Regulatory Commission (NRC) method. The event-tree method is appropriate for an incompletely characterized site, where there must be an evolving understanding, over time, of the processes at work, for a site that may require analysis of details in specific context, and when the scenario functions to guide site characterization. Anticipating the eventual requirement for using the NRC method, we show that the event-tree method can be translated to the NRC format after final scenario screening

  12. Long-term symptomatic, functional, and work outcomes of carpal tunnel syndrome among construction workers.

    Science.gov (United States)

    Evanoff, Bradley; Gardner, Bethany T; Strickland, Jaime R; Buckner-Petty, Skye; Franzblau, Alfred; Dale, Ann Marie

    2016-05-01

    The long-term outcomes of carpal tunnel syndrome (CTS) including symptoms, functional status, work disability, and economic impact are unknown. We conducted a retrospective study of 234 active construction workers with medical claims for CTS and 249 workers without CTS claims; non-cases were matched on age, trade, and insurance eligibility. We conducted telephone interviews with cases and non-cases and collected administrative data on work hours. Compared to non-cases, CTS cases were more likely to report recurrent hand symptoms, decreased work productivity/quality, decreased performance of physical work demands, and greater functional limitations. Surgical cases showed larger improvements on multiple outcomes than non-surgical cases. Minimal differences in paid work hours were seen between cases and non-cases in the years preceding and following CTS claims. Persistent symptoms and functional impairments were present several years after CTS diagnosis. Long-term functional limitations shown by this and other studies indicate the need for improved prevention and treatment. © 2016 Wiley Periodicals, Inc.

  13. 4D modeling in high-rise construction

    Science.gov (United States)

    Balakina, Anastasiya; Simankina, Tatyana; Lukinov, Vitaly

    2018-03-01

    High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  14. Environmental restoration plans and activities in Slovenia: 1995-1996 progress reprot

    International Nuclear Information System (INIS)

    Logar, Z.

    1997-01-01

    This report gives a brief status and description of new developments in the remediation activities which are going on at Zirovski Vrh Uranium Mine site during the last two years. The progress of the implementation has slowed down compared to the plans. Reasons for that are: (a) legal problems (responsibilities between two authorized governmental agencies) in the procedure for obtaining location permit for the long-term site remediation of the wide exploitation area, particularly for the mill tailings disposal site; (b) lack of funding. However, some tasks have been performed during this period in the field of investigations, reporting to the authorities, design and to a lesser extent actual implementation. The investigations have concentrated on the hydrology of the site underground waters, radiological site characterization and investigation of locally available materials for constructing the cover of the waste disposal sites. On the basis of R2Vs Environmental Impact Report, Slovenian Health Inspectorate has officially set authorized limits for radioactive pollutants emission for mine water and mill tailings and mine waste disposal sites. Detailed drawings of the mill site decommissioning have been presented to the authorities. Approval by the authorities is expected to be granted soon. This represents the last stage in the procedures for obtaining permissions before the field work at the mill site can be formally started. The problem of the mill tailings earth slide has been successfully solved by constructing geotechnical underground water drainage structures including vertical dewatering wells. Some research and investigation projects are in progress to promote knowledge on radiological site characterization, water pathway emission of the pollutants and to identify required materials locally available for the mine waste and the mill tailings cover construction. Measurements of the radioactivity in Ziovski Vrh Uranium Mine environment and assessment of its

  15. Progress of work in the FY1993 on the subject-2. Study on the validation of assessment models used in an environmental consequence assessment methodology for nuclear accidents

    International Nuclear Information System (INIS)

    1994-01-01

    Concerning the above subject, in this report, the progress of work in FY 1993 and the working plan for the remaining period are described. The summaries of the progress are given in the Appendix. This is the copy of the report presented at the second steering conference. The progress of work carried out by JAERI in FY 1993 were the analysis of data handed over from CHECIR, and the development of data bases. In the remaining period of FY1993, Dr. Ponomarev of CHECIR will visit JAERI for 15 days in March, 1994. The various kinds of data which must be prepared for the implementation of the above subject, and the data that have been handed over so far from CHECIR are shown. The analysis of the site-specific input data for OSCAAR such as source terms, meteorological data and topographical data, and the data for being compared with the model prediction such as the spectrometry analysis of soil samples in each layer, γ ray dose rate and others are described. The data which were installed into the data base management system are shown. The working plan for FY 1994 on the above subject is added. (K.I.)

  16. CONSTRUCT VALIDITY AND SCORING METHODS OF THE WORLD HEALTH ORGANIZATION- HEALTH AND WORK PERFORMANCE QUESTIONNAIRE AMONG WORKERS WITH ARTHRITIS AND RHEUMATOLOGICAL CONDITIONS

    Science.gov (United States)

    AlHeresh, Rawan; LaValley, Michael P.; Coster, Wendy; Keysor, Julie J.

    2017-01-01

    Objective To evaluate construct validity and scoring methods of the world health organization- health and work performance questionnaire (HPQ) for people with arthritis. Methods Construct validity was examined through hypothesis testing using the recommended guidelines of the Consensus-based Standards for the selection of health Measurement Instruments (COSMIN). Results The HPQ using the absolute scoring method showed moderate construct validity as 4 of the 7 hypotheses were met. The HPQ using the relative scoring method had weak construct validity as only one of the 7 hypotheses were met. Conclusion The absolute scoring method for the HPQ is superior in construct validity to the relative scoring method in assessing work performance among people with arthritis and related rheumatic conditions; however, more research is needed to further explore other psychometric properties of the HPQ. PMID:28598938

  17. Construct Validity and Scoring Methods of the World Health Organization: Health and Work Performance Questionnaire Among Workers With Arthritis and Rheumatological Conditions.

    Science.gov (United States)

    AlHeresh, Rawan; LaValley, Michael P; Coster, Wendy; Keysor, Julie J

    2017-06-01

    To evaluate construct validity and scoring methods of the world health organization-health and work performance questionnaire (HPQ) for people with arthritis. Construct validity was examined through hypothesis testing using the recommended guidelines of the consensus-based standards for the selection of health measurement instruments (COSMIN). The HPQ using the absolute scoring method showed moderate construct validity as four of the seven hypotheses were met. The HPQ using the relative scoring method had weak construct validity as only one of the seven hypotheses were met. The absolute scoring method for the HPQ is superior in construct validity to the relative scoring method in assessing work performance among people with arthritis and related rheumatic conditions; however, more research is needed to further explore other psychometric properties of the HPQ.

  18. Nano-Aptasensing in Mycotoxin Analysis: Recent Updates and Progress

    Directory of Open Access Journals (Sweden)

    Amina Rhouati

    2017-10-01

    Full Text Available Recent years have witnessed an overwhelming integration of nanomaterials in the fabrication of biosensors. Nanomaterials have been incorporated with the objective to achieve better analytical figures of merit in terms of limit of detection, linear range, assays stability, low production cost, etc. Nanomaterials can act as immobilization support, signal amplifier, mediator and artificial enzyme label in the construction of aptasensors. We aim in this work to review the recent progress in mycotoxin analysis. This review emphasizes on the function of the different nanomaterials in aptasensors architecture. We subsequently relate their features to the analytical performance of the given aptasensor towards mycotoxins monitoring. In the same context, a critically analysis and level of success for each nano-aptasensing design will be discussed. Finally, current challenges in nano-aptasensing design for mycotoxin analysis will be highlighted.

  19. Working Relationships for Sustainability: Improving Work-based Relationships in Local Government to bring about Sustainability Goals

    Directory of Open Access Journals (Sweden)

    Jade Herriman

    2012-08-01

    Full Text Available There’s no escape: we are always in relationship. Being aware of this matters. Doing something to build constructive relationships for sustainability, matters even more. This paper considers the connection between good relationships and effective sustainability work in local government. It draws on the collective experiences of four practitioners who have worked over many years in, with or for local government and argues that a good deal of project success is contingent upon the development of positive relationships with stakeholders, contractors, communities, businesses, colleagues, partners and other agencies and agency officers. Relationships can help or hinder project process, progress and outcomes. This paper identifies some approaches for building quality relationships and uses examples to highlight these strategies. These include: recognising that developing and maintaining resilient relationships and high quality communication is a critical foundation for success; designing projects with explicit relationship outcomes; and allocating time, money and other resources to support the development of effective relationships.

  20. APPLICATION OF SIMPLIFIED TAXATION SYSTEM IN CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    O. S. Golubova

    2011-01-01

    Full Text Available Specificity concerning cost formation of construction work executed by  entities of small business enterprises that use a simplified taxation system has a direct impact on the effectiveness of organization activity. Dozens of business entities applying various taxation systems are involved in the execution of the construction process. For this reason an inclusion of taxes in work cost may have a decisive influence on the selection of a contractor for an object construction.  

  1. A versatile mathematical work-flow to explore how Cancer Stem Cell fate influences tumor progression.

    Science.gov (United States)

    Fornari, Chiara; Balbo, Gianfranco; Halawani, Sami M; Ba-Rukab, Omar; Ahmad, Ab Rahman; Calogero, Raffaele A; Cordero, Francesca; Beccuti, Marco

    2015-01-01

    Nowadays multidisciplinary approaches combining mathematical models with experimental assays are becoming relevant for the study of biological systems. Indeed, in cancer research multidisciplinary approaches are successfully used to understand the crucial aspects implicated in tumor growth. In particular, the Cancer Stem Cell (CSC) biology represents an area particularly suited to be studied through multidisciplinary approaches, and modeling has significantly contributed to pinpoint the crucial aspects implicated in this theory. More generally, to acquire new insights on a biological system it is necessary to have an accurate description of the phenomenon, such that making accurate predictions on its future behaviors becomes more likely. In this context, the identification of the parameters influencing model dynamics can be advantageous to increase model accuracy and to provide hints in designing wet experiments. Different techniques, ranging from statistical methods to analytical studies, have been developed. Their applications depend on case-specific aspects, such as the availability and quality of experimental data, and the dimension of the parameter space. The study of a new model on the CSC-based tumor progression has been the motivation to design a new work-flow that helps to characterize possible system dynamics and to identify those parameters influencing such behaviors. In detail, we extended our recent model on CSC-dynamics creating a new system capable of describing tumor growth during the different stages of cancer progression. Indeed, tumor cells appear to progress through lineage stages like those of normal tissues, being their division auto-regulated by internal feedback mechanisms. These new features have introduced some non-linearities in the model, making it more difficult to be studied by solely analytical techniques. Our new work-flow, based on statistical methods, was used to identify the parameters which influence the tumor growth. The

  2. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  3. Present status of refining and conversion facility dismantling. Progress in latter half of 2010FY

    International Nuclear Information System (INIS)

    Kado, Kazumi; Sugitsue, Noritake; Morimoto, Yasuyuki; Ikegami, Sohei; Tanaka, Yoshio; Takahashi, Nobuo; Tokuyasu, Takashi

    2011-09-01

    The Refining and Conversion Facility located in the Ningyo-toge Environmental Engineering Center had the natural uranium conversion process and reprocessed uranium conversion process. The construction of this facility was started in 1979 and completed in October 1981. Dismantling of equipments in radiation controlled area of this facility was started from 2008. Equipments in radiation controlled area (excluding ventilating equipment and liquid waste treatment equipment) will be dismantled by the 2011 fiscal year, and ventilating equipment and liquid waste treatment equipment will be dismantled by the 2014 fiscal year. This report describes the master plan of this decommissioning and shows as the progress in latter half year of 2010FY, the actual time schedule, the method of decommissioning, the decommissioning progress appearance with photographs, work rates of each room / each worker class, and the quantity of dismantled materials and secondary wastes. (author)

  4. Computer integrated construction at AB building in reprocessing plant

    International Nuclear Information System (INIS)

    Takami, Masahiro; Azuchi, Takehiro; Sekiguchi, Kenji

    1999-01-01

    JNFL (Japan Nuclear Fuel Limited) is now processing with construction of the spent nuclear fuel reprocessing plant at Rokkasho Village in Aomori Prefecture, which is coming near to the busiest period of construction. Now we are trying to complete the civil work of AB Building and KA Building in a very short construction term by applying CIC (Computer Integrated Construction) concept, in spite of its hard construction conditions, such as the massive and complicated building structure, interferences with M and E (Mechanical and Electrical) work, severe winter weather, remote site location, etc. The key technologies of CIC are three-dimensional CAD, information network, and prefabrication and mechanization of site work. (author)

  5. Progress in D-brane model building

    International Nuclear Information System (INIS)

    Marchesano, F.

    2007-01-01

    The state of the art in D-brane model building is briefly reviewed, focusing on recent achievements in the construction of D=4 N=1 type II string vacua with semi-realistic gauge sectors. Such progress relies on a better understanding of the spectrum of BPS D-branes, the effective field theory obtained from them and the explicit construction of vacua. We first consider D-branes in standard Calabi-Yau compactifications, and then the more involved case of compactifications with fluxes. We discuss how the non-trivial interplay between D-branes and fluxes modifies the previous model-building rules, as well as provides new possibilities to connect string theory to particle physics. (Abstract Copyright [2007], Wiley Periodicals, Inc.)

  6. 23 CFR 635.122 - Participation in progress payments.

    Science.gov (United States)

    2010-04-01

    ... OPERATIONS CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.122 Participation in progress payments. (a..., based on a request for reimbursement submitted by State transportation departments. When the contract... value of the stockpiled material shall not exceed the appropriate portion of the value of the contract...

  7. Evaluating the financial cost and impact on long-term pavement performance of expediting Michigan's road construction work.

    Science.gov (United States)

    2014-02-01

    The Michigan Department of Transportation (MDOT) has been using monetary incentive payments for many : years to accelerate highway construction work, resulting in reduced delays to the traveling public. It was : envisioned that incentive/disincentive...

  8. Prevention program at construction worksites aimed at improving health and work ability is cost-saving to the employer: Results from an RCT

    NARCIS (Netherlands)

    Oude Hengel, K.M.; Bosmans, J.E.; Dongen, J.M. van; Bongers, P.M.; Beek, A.J. van der; Blatter, B.M.

    2014-01-01

    Background: To prolong sustainable healthy working lives of construction workers, a prevention program was developed which aimed to improve the health and work ability of construction workers. The objective of this study was to analyze the cost-effectiveness and financial return from the employers'

  9. Application Of The Work Breakdown Structure In Determining Cost Buffers In Construction Schedules

    Directory of Open Access Journals (Sweden)

    Połoński M.

    2015-03-01

    Full Text Available The paper presents methods of determining the location of cost buffers and corresponding contingency costs in the CPM schedule based on its work breakdown structure. Application of correctly located cost buffers with appropriately established reserve costs is justified by the common overrunning of scheduled costs in construction projects. Interpolated cost buffers (CB as separate tasks have been combined with relevant summary tasks by the start–to–start (SS relationship, whereas the time of their execution has been dynamically connected with the time of accomplishment of particular summary tasks using the “paste connection” option. Besides cost buffers linked with the group of tasks assigned to summary tasks, a definition of the cost buffer for the entire project (PCB has been proposed, i.e. as one initial task of the entire project. Contingency costs corresponding to these buffers, depending on the data that the planner has at his disposal, can be determined using different methods, but always depend on the costs of all tasks protected by each buffer. The paper presents an exemplary schedule for a facility and the method of determining locations and cost for buffers CB and PCB, as well as their influence on the course of the curve illustrating the budgeted cost of work scheduled (BCWS. The proposed solution has been adjusted and presented with consideration of the possibilities created by the scheduling software MS Project, though its general assumptions may be implemented with application of other similar specialist tools.

  10. Haiyang nuclear power construction management and practice

    International Nuclear Information System (INIS)

    Wang Fengxue

    2010-01-01

    The paper introduces the basic situation of Shandong Haiyang Nuclear Power Plant, as well as the management and progress of the project. Through the construction management practice, problems encountered in nuclear power construction are put forward for peer exchange and discussion. (author)

  11. 4D modeling in high-rise construction

    Directory of Open Access Journals (Sweden)

    Balakina Anastasiya

    2018-01-01

    Full Text Available High-rise construction is a complex construction process, requiring the use of more perfected and sophisticated tools for design, planning and construction management. The use of BIM-technologies allows minimizing the risks associated with design errors and errors that occur during construction. This article discusses a visual planning method using the 4D model, which allows the project team to create an accurate and complete construction plan, which is much more difficult to achieve with the help of traditional planning methods. The use of the 4D model in the construction of a 70-story building allowed to detect spatial and temporal errors before the start of construction work. In addition to identifying design errors, 4D modeling has allowed to optimize the construction, as follows: to optimize the operation of cranes, the placement of building structures and materials at various stages of construction, to optimize the organization of work performance, as well as to monitor the activities related to the preparation of the construction site for compliance with labor protection and safety requirements, which resulted in saving money and time.

  12. Ways of decreasing the labour content and construction duration for the RBMK-1000 NPP

    International Nuclear Information System (INIS)

    Chernyshenko, V.M.

    1984-01-01

    Problems associated with reducing the labour content and duration of construction for the RBMK-1000 NPPs are considered. General and specific labour contents for construction of the first units at the Kursk and Chernobylsk, NPPs as well as progress chart for construction-installation work at the 1-st unit of the Smolensk and 3-d unit of the Chernobylsk NPPs are presented. The analysis has shown that reduction in the general labour costs and therefore, duration of construction can be attained by reducing the number of auxiliary objects, increasing the level and mechanization of construction (with optimum utilization of gantry and turret cranes) as well as by mechanization of placing concrete mortars and use of large-block structures. According to preliminary calculations, the introduction of new solutions would ensure reduction of construction periods to 24 months for the second units and reduction of labour content by 8 to 10% at the Kursk and Chernobylsk NPPs

  13. Repetitive Model Refinement for Questionnaire Design Improvement in the Evaluation of Working Characteristics in Construction Enterprises

    Directory of Open Access Journals (Sweden)

    Jeng-Wen Lin

    2015-11-01

    Full Text Available This paper presents an iterative confidence interval based parametric refinement approach for questionnaire design improvement in the evaluation of working characteristics in construction enterprises. This refinement approach utilizes the 95% confidence interval of the estimated parameters of the model to determine their statistical significance in a least-squares regression setting. If this confidence interval of particular parameters covers the zero value, it is statistically valid to remove such parameters from the model and their corresponding questions from the designed questionnaire. The remaining parameters repetitively undergo this sifting process until their statistical significance cannot be improved. This repetitive model refinement approach is implemented in efficient questionnaire design by using both linear series and Taylor series models to remove non-contributing questions while keeping significant questions that are contributive to the issues studied, i.e., employees’ work performance being explained by their work values and cadres’ organizational commitment being explained by their organizational management. Reducing the number of questions alleviates the respondent burden and reduces costs. The results show that the statistical significance of the sifted contributing questions is decreased with a total mean relative change of 49%, while the Taylor series model increases the R-squared value by 17% compared with the linear series model.

  14. Constructing a knowledge-based identity: Experiences from working with intellectual capital statements

    DEFF Research Database (Denmark)

    Kjærgaard, Isa Jensen

    2003-01-01

    how it wishes to define its activities both externally and internally. The paper concludes that, by working with IC statements, a company can achieve a way of constructing a new identity. Furthermore, the process of creating an IC statement can legitimize the whole idea of changing towards a knowledge......This paper analyses the inter-relationship between organizational identity and intellectual capital (IC) statements and suggests the IC statement as a framework for developing a knowledge-based identity. The results are based on a case study of a Danish electricity transmission system company......, which started the process of changing its public provider identity towards a knowledge-based identity in a changing market by applying the framework of an IC statement. The IC statement, as a new way of defining and working with strategic company resources, makes it possible for a company to communicate...

  15. Proposal for the award of a contract for the wood construction work for the Globe of Innovation project

    CERN Document Server

    2003-01-01

    This document concerns the award of a contract for the wood construction work for the Globe of Innovation project. A call for tenders (IT-3260/ST/GIR) was sent on 31 October 2003 to twelve firms in one Member State. By the closing date, CERN had received five tenders from four firms and one consortium. The Finance Committee is invited to agree to the negotiation of a contract with CIB (CH), the lowest bidder, for the wood construction work for the Globe of Innovation project for an estimated amount not exceeding 820 000 Swiss francs, not subject to revision. The firm has indicated the following distribution by country of the contract value covered by this adjudication proposal: CH - 100%.

  16. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  17. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  18. The implementation of unit price of work standard SNI 7394: 2008 for the construction of reinforced concrete beam

    Science.gov (United States)

    Tripoli; Mubarak; Nurisra; Mahmuddin

    2018-05-01

    This paper discusses the implementation of Indonesian National Standard (SNI) 7394: 2008 on procedures for calculating the unit price of concrete work for the construction of building and housing. The standard provides some reinforced concrete constructions unit price (UP) analysis by specified the total number of reinforcing uses. Related to reinforced concrete beam work (Analysis No. 6.31), the reinforcement requirement is stated at 200 kg/m3 of concrete. Once the implementation considers various earthquake zoning, the question will arise about the extent to which the standard is feasible to apply. Therefore, this research aimed to analyze the possibility of UP standard implementation by certain earthquake zonation. This research is focused on the construction of reinforced concrete beam for buildings with function as educational, residential and office buildings. The data used are sourced from 21 buildings in two zones in Aceh Province, covering Zone 10 and Zone 15 based on earthquake map of SNI 1726: 2012. The analysis results indicate that the UP standard for reinforced concrete beam cannot be applied to all zoning. The UP standard is only possible on buildings constructed in Zone 10 or zonation with seismic spectral response 0.6g to 0.7g or lower.

  19. Construction industry accidents in Spain.

    Science.gov (United States)

    Camino López, Miguel A; Ritzel, Dale O; Fontaneda, Ignacio; González Alcantara, Oscar J

    2008-01-01

    This paper analyzed industrial accidents that take place on construction sites and their severity. Eighteen variables were studied. We analyzed the influence of each of these with respect to the severity and fatality of the accident. This descriptive analysis was grounded in 1,630,452 accidents, representing the total number of accidents suffered by workers in the construction sector in Spain over the period 1990-2000. It was shown that age, type of contract, time of accident, length of service in the company, company size, day of the week, and the remainder of the variables under analysis influenced the seriousness of the accident. IMPACT ON INJURY PREVENTION: The results obtained show that different training was needed, depending on the severity of accidents, for different age, length of service in the company, organization of work, and time when workers work. The research provides an insight to the likely causes of construction injuries in Spain. As a result of the analysis, industries and governmental agencies in Spain can start to provide appropriate strategies and training to the construction workers.

  20. Construction and testing of JT-60

    International Nuclear Information System (INIS)

    Kishimoto, H.; Aikawa, H.; Oikawa, A.; Miya, N.; Suzuki, K.; Ozeki, T.; Tokutake, T.; Kunieda, S.; Hiruta, K.; Hosoda, R.

    1987-01-01

    The JT-60 project is reviewed in terms of design, R and D, construction, commissioning and project management. Design features of JT-60 have been refined and renewed through periodic assessments. Engineering targets have been achieved by R and D efforts. Construction and commissioning have progressed on schedule with intensive project management and control. JT-60 obtained high performance and has entered into the experimental phase after completion of machine construction. (orig.)

  1. 4D Applications of GIS in Construction Management

    Directory of Open Access Journals (Sweden)

    A. Chaitanya Kumar

    2017-01-01

    Full Text Available Construction industries broadly involve different set of construction activities which are to be executed as per schedule and the major software used for scheduling is PRIMAVERA and Microsoft Project (MSP. But the software still lacks a feature of providing spatial aspects of information in construction schedule. Recently, advanced technology like 4D GIS plays a major role in overcoming the limitation of the software. 4D GIS technology includes integration of 2D drawings from AutoCAD and schedules prepared in PRIMAVERA software. In the present study, a multistair residential building has been selected. ARCMAP 10.2 is used for interlinking of schedules as well as drawings and ARCSCENE has been used for developing 4D view. This linkage between scheduled activities and respective drawings in GIS helps in identifying construction sequences and also in detecting logical errors that occur in project schedules. The developed 4D view provides better visualization of construction progress of a project.

  2. Methodology for quantification of waste generated in Spanish railway construction works.

    Science.gov (United States)

    de Guzmán Báez, Ana; Villoria Sáez, Paola; del Río Merino, Mercedes; García Navarro, Justo

    2012-05-01

    In the last years, the European Union (EU) has been focused on the reduction of construction and demolition (C&D) waste. Specifically, in 2006, Spain generated roughly 47million tons of C&D waste, of which only 13.6% was recycled. This situation has lead to the drawing up of many regulations on C&D waste during the past years forcing EU countries to include new measures for waste prevention and recycling. Among these measures, the mandatory obligation to quantify the C&D waste expected to be originated during a construction project is mandated. However, limited data is available on civil engineering projects. Therefore, the aim of this research study is to improve C&D waste management in railway projects, by developing a model for C&D waste quantification. For this purpose, we develop two equations which estimate in advance the amount, both in weight and volume, of the C&D waste likely to be generated in railway construction projects, including the category of C&D waste generated for the entire project. Copyright © 2012 Elsevier Ltd. All rights reserved.

  3. Musculoskeletal health and work ability in physically demanding occupations: study protocol for a prospective field study on construction and health care workers.

    Science.gov (United States)

    Lunde, Lars-Kristian; Koch, Markus; Knardahl, Stein; Wærsted, Morten; Mathiassen, Svend Erik; Forsman, Mikael; Holtermann, Andreas; Veiersted, Kaj Bo

    2014-10-16

    Musculoskeletal disorders have a profound impact on individual health, sickness absence and early retirement, particularly in physically demanding occupations. Demographics are changing in the developed countries, towards increasing proportions of senior workers. These senior workers may have particular difficulties coping with physically demanding occupations while maintaining good health. Previous studies investigating the relationship between physical work demands and musculoskeletal disorders are mainly based on self-reported exposures and lack a prospective design. The aim of this paper is to describe the background and methods and discuss challenges for a field study examining physical demands in construction and health care work and their prospective associations with musculoskeletal disorders, work ability and sickness absence. This protocol describes a prospective cohort study on 1200 construction and health care workers. Participants will answer a baseline questionnaire concerning musculoskeletal complaints, general health, psychosocial and organizational factors at work, work demands, work ability and physical activity during leisure. A shorter questionnaire will be answered every 6th months for a total of two years, together with continuous sickness absence monitoring during this period. Analysis will prospectively consider associations between self-reported physical demands and musculoskeletal disorders, work ability and sickness absence. To obtain objective data on physical exposures, technical measurements will be collected from two subgroups of N = 300 (Group A) and N = 160 (Group B) during work and leisure. Both group A and B will be given a physical health examination, be tested for physical capacity and physical activity will be measured for four days. Additionally, muscle activity, ground reaction force, body positions and physical activity will be examined during one workday for Group B. Analysis of associations between objectively measured

  4. Experience in the construction of a spent nuclear fuel reprocessing plant

    International Nuclear Information System (INIS)

    Yamashita, Hiroshi

    1976-01-01

    The construction and operation of a reprocessing plant was first published in 1956. The Reprocessing Expert Committee of AEC was established in 1959, and the preliminary design was finished in 1964 by NCP of Britain. The detailed design was completed in 1969 by SGN of France, and the training of operators was carried out in parallel with this in France. The results of the safety investigation was approved in Jan. 1970, and the construction was started in June 1971. The site of the reprocessing plant is the eastern part of the Tokai Establishment of PNC. The process adopted is the wet Purex process having been established in large practical plants. The treating capacity is 0.7 t/day. The main processes are acceptance and storage, mechanical treatment, and chemical treatment. The reprocessing facilities comprise the main shop, the analysis station, the main exhaust stack, the decontamination station, the solid waste store, the sea discharge pipe, and other incidental facilities. The construction works were about 7 months behind the schedule when the water flow test was finished. The chemical test was finished in March, 1975, and the uranium test is in progress since Sept., 1975. The problems for future are the developments of effective waste treatment and storing techniques, and the researches have been carried out by PNC. The construction project of the second plant is urgently required, since it takes 10 years from planning to operation. (Kako, I.)

  5. Research on university culture construction in the view of ecological idea

    Directory of Open Access Journals (Sweden)

    Wang Xinggang

    2016-01-01

    Full Text Available With the progress of times, our spiritual pursuit becomes higher and higher, and it is especially true among modern youth. Therefore, establishment of university culture has gradually become the focus of attention. This paper firstly quantized university culture construction into four parts: material culture construction, spiritual culture construction, system culture construction, and behavioral culture construction. It then analogized each part as one population in ecological system; established multi-population ecological model; and analyzed the interactional relations between each part. At last, this paper reached conclusions based on multi-population ecological model and analyzed the correlations among various factors of university culture construction, so as to obtain a comprehensive, scientific and healthy scheme for university culture construction.

  6. Construction of a kinetics model for liquid-solid transitions built from atomistic simulations

    Science.gov (United States)

    Benedict, Lorin; Zepeda-Ruiz, Luis; Haxhimali, Tomorr; Hamel, Sebastien; Sadigh, Babak; Chernov, Alexander; Belof, Jonathan

    We discuss work in progress towards a kinetics model for dynamically-driven liquid-solid transitions built from MD simulations. The growth of solid particles within a liquid is studied for a range of conditions, and careful attention is paid to the construction of an accurate multi-phase (equilibrium) equation of state for the system under consideration, in order to provide a framework upon which the non-equilibrium physics is based. His work was performed under the auspices of the U.S. Department of Energy by Lawrence Livermore National Laboratory under Contract DE-AC52-07NA27344. Lawrence Livermore National Security, LLC.

  7. Forgotten constructions erected for mining and salt-works activities in Zlatá Baňa

    Directory of Open Access Journals (Sweden)

    Ján Brehuv

    2008-06-01

    Full Text Available Village Zlatá Baňa is known for the mining activities for gold, silver, mercury and antimony in the past. This article is devoted notto mining activities but to forgotten 2 dams, which were erected on the Delňa brook. The first was constructed above Zlatá Baňa fromwood in 1691 and does not exist presently. The second one was erected beneath Zlatá Baňa between 1802 – 1807 from stone and cementmortar. It exists up to this day but it is not working. The mentioned dams enabled to create water reservoirs. The first one enabled the water transport of wood trunksfrom Žlatá Baňa to Soľná Baňa in 1691 for a mining output of a salt-stone (or stone-salt. In the years 1807-1917, water from the second reservoir enabled the water transport of wood by a wooden flume 18,9 km long from Zlatá Baňa to the salt-works in Solivar. The mentioned dams and their water reservoirs enabled the high economical effectivity of the mining output of salt and salt-production of the salt-works in Solivar.

  8. Low cost solar array project. Quarterly progress report, January-March, 1981

    Energy Technology Data Exchange (ETDEWEB)

    1981-01-01

    The engineering design, fabrication, assembly, operation, economic analysis, and process support R and D for an Experimental Process System Development Unit (EPSDU) are presented. The civil construction work was completed and the mechanical bid package is in preparation. The electrical design effort is in progress. Parallel efforts which complement the mechanical design are the process flow diagrams and control instrumentation logic for startup operation and shutdown. These are in progress and will identify all process and utility streams, control systems, and flow logic. The data collection system takes the signals from the instrumentation, translates them into engineering units and finally develops a data report which summarizes all key performance parameters. Cleaning procedures have been established to assure a contamination-free product and inspection visits have been made to the fabricators of specialty equipment.

  9. THE IMPACT OF CONSTRUCTION AND GENTRIFICATION ON AN OUTDOOR TRANS SEX WORK ENVIRONMENT: VIOLENCE, DISPLACEMENT AND POLICING.

    Science.gov (United States)

    Lyons, Tara; Krüsi, Andrea; Pierre, Leslie; Small, Will; Shannon, Kate

    2017-12-01

    The objective of this study was to investigate how environmental and structural changes to a trans outdoor work environment impacted sex workers in Vancouver, Canada. The issue of changes to the work area arose during qualitative interviews with 33 trans sex workers. In response, ethnographic walks that incorporated photography were undertaken with trans sex workers. Changes to the work environment were found to increase vulnerabilities to client violence, displace trans sex workers, and affect policing practices. Within a criminalized context, construction and gentrification enhanced vulnerabilities to violence and harassment from police and residents.

  10. Construction of scientific knowledge in motor learning: history and perspectives

    Directory of Open Access Journals (Sweden)

    Cláudio Márcio Oliveira

    2008-06-01

    Full Text Available The present work aims to inquire the construction of scientific knowledge in the motor learning area. A necessary historical retrospective on this study field considers the epistemology of Francis Bacon, Karl Popper, Paul Feyerabend and Thomas Kuhn. Bacon and Popper’s conceptions show to be inadequate to explain the scientific progress of motor learning. Feyerabend’s ideas are also inadequate as they lack coherency, even though in some aspects they are adequate. The Kuhnian approach, however, seems more satisfactory, particularly with regard to the notion of “crisis of paradigm” between the ecological approach and the information-processing approach. A critique is offered from human and social sciences perspective. This leads us to reflect on the possible growth of a new paradigm and consider scientific practice as a social practice.

  11. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthelemy, Michel; Escobar Rangel, Lina

    2013-01-01

    This paper provides the first comparative analysis of nuclear reactor construction costs in France and the United States. Studying the cost of nuclear power has often been a challenge, owing to the lack of reliable data sources and heterogeneity between countries, as well as the long time horizon which requires controlling for input prices and structural changes. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using expected demand variation as an instrument. We argue that benefits from nuclear reactor program standardization can arise through short term coordination gains, when the diversity of nuclear reactors' technologies under construction is low, or through long term benefits from learning spillovers from past reactor construction experience, if those spillovers are limited to similar reactors. We find that overnight construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect-Engineer (A- E). In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. (authors)

  12. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  13. Occupational safety issues in residential construction surveyed in Wisconsin, United States.

    Science.gov (United States)

    Choi, Sang D; Carlson, Kathryn

    2014-01-01

    Residential construction is a high-risk industry in the U.S. due to the exposure to work-related safety hazards and fall injuries. This study aimed to examine the safety training and safe work practices of construction workers within the small residential construction industry. In order to achieve the study objectives, a survey was designed and sent to approximately 200 Wisconsin based residential construction contractors. About one third of the respondents stated that they did not have any form of safety programs. The study indicated that the most common types of work-related injuries in residential construction were slips/trips/falls and cuts/lacerations. The survey findings also suggested that the residential construction contractors needed to increase the utilization of fall protection safety equipment. Further education and subject matter expert training could provide benefits to improve occupational safety and health of the small business workforce in the residential construction industry.

  14. Advocating mindset for cooperative partnership for better future of construction industry

    Science.gov (United States)

    Omar, Datuk Wahid

    2017-11-01

    Construction industry players are known for their low acceptance on the changes. Hence, it is identified that the biggest challenge in the industry is changing the mindset. This paper highlights the importance of transformation in shaping for better future of the industry. Transformation favors innovation and progressive development in the industry and specifically in managing a project. Thus changes in mindset of players with an eye to the future and focus on what is coming are paramount in inculcating the transformation culture in construction eco-system. The key to the success of transformation is the collaborative and cooperative partnering which ensuring the performance of every stage of project delivery. The collaborative, cooperative and concerted effort of all parties involved in the project creates mutual understanding on mission and vision of project. Adopting healthy and harmonious project culture, implementing innovative procurement that emphasis on fair risk sharing should be a working culture. This cooperative partnership should be the future of the project undertaking in the construction industry.

  15. A Construction Management Framework for Mass Customisation in Traditional Construction

    Directory of Open Access Journals (Sweden)

    María Dolores Andújar-Montoya

    2015-04-01

    Full Text Available A Mass Customisation model is discussed as a competitive positioning strategy in the marketplace adding value to the customer’s end-use. It includes the user as part of the construction process responding to the customer’s demands and wishes. To the present day, almost all proposals for Mass Customisation have been focused on the design phase and single family houses. The reality is that the processes carried out in the work execution are so inefficient that the costs of the Mass Customisation models are assumed by the customer and they do not offer solutions that support the change management. Furthermore, this inefficiency often makes Mass Customisation unfeasible in terms of deadlines and site management. Therefore, the present proposal focuses on achieving the paradigm of Mass Customisation in the traditional residential construction complementary to the existing proposals in the design phase. All this through the proposal of a framework for the integral management in the work execution, which will address change management introduced by the users offering an efficient and productive model that reduces costs in the process. This model will focus on the synergy between different strategies, techniques and technologies currently used in the construction management (such as Lean Construction or Six Sigma, together with, other strategies and technologies that have proven to be valid solutions in other fields (such as Business Process Management, Service Oriented Architecture, etc..

  16. Long-run Determinants of Technological Progress in Nigeria ...

    African Journals Online (AJOL)

    This study utilized time series data sets on TFP constructed based on purchasing power parity covering from 1960-2010 to estimate long run determinants of technological progress in Nigeria using Vector Error Correction Mode(VECM)l. The co-integration result shows evidence of two cointegrating equations while the Fully ...

  17. UCIMS: Advances in geotechnical construction and performance monitoring

    Directory of Open Access Journals (Sweden)

    Raphael Siebenmann

    2015-04-01

    Full Text Available The Crossrail project currently under construction in Central London has been described as “The Big Dig on Steroids”, obviously referencing the Central Artery/Tunnel project in Boston completed in 2007. To address the multiple demands for timely construction performance monitoring, Crossrail envisioned the underground construction information management system (UCIMS to monitor construction progress and structural health along the entire route, with a network of geotechnical instruments (i.e. slope inclinometers, extensometers, piezometers, etc. and tunnel boring machine (TBM position information. The UCIMS is a geospatially referenced relational database that was developed using an open source geographic information system (GIS that allowed all stakeholders near immediate feedback of construction performance. The purpose of this article is to provide a brief history of geotechnical and structural monitoring software, to describe the structure and operation of the UCIMS, and to demonstrate how the functionality afforded by this system provided the requisite feedback to the stakeholders. Examples will be given regarding how the data management and visualization concepts incorporated into the UCIMS advanced the geotechnical construction industry.

  18. The methodic of calculation for the need of basic construction machines on construction site when developing organizational and technological documentation

    Science.gov (United States)

    Zhadanovsky, Boris; Sinenko, Sergey

    2018-03-01

    Economic indicators of construction work, particularly in high-rise construction, are directly related to the choice of optimal number of machines. The shortage of machinery makes it impossible to complete the construction & installation work on scheduled time. Rates of performance of construction & installation works and labor productivity during high-rise construction largely depend on the degree of provision of construction project with machines (level of work mechanization). During calculation of the need for machines in construction projects, it is necessary to ensure that work is completed on scheduled time, increased level of complex mechanization, increased productivity and reduction of manual work, and improved usage and maintenance of machine fleet. The selection of machines and determination of their numbers should be carried out by using formulas presented in this work.

  19. Non-shoring construction for T/G pedestal beams

    International Nuclear Information System (INIS)

    Abe, T.

    1992-01-01

    The T/G pedestal construction work has been the critical path within the T/B construction work of BWR type nuclear power plant. In order to meet the requirement of shortening the construction period and improved in safety on a Turbine Building (T/B) construction work, Non-soring construction for T/G Pedestal Beams was developed. By applying this method to T/G pedestal construction work, we succeeded in shortening the T/B construction period and improvement in safety significantly. (author)

  20. "Work in progress" : the hidden dimensions of monitoring and planning in Pakistan

    NARCIS (Netherlands)

    Kolkma, W.A.M.

    1998-01-01

    The study argues that monitoring systems for large numbers of projects constituting public sector development programmes such as found in Pakistan, are built on the positivist premise that progress can be summarised objectively and in a few concise statements or indicators. Theory and

  1. Organizing Construction Practices in Different Cultural Contexts

    DEFF Research Database (Denmark)

    Thuesen, Christian; Rasmussen, Christian K. S.

    2013-01-01

    a number of characteristics and challenges related to the cultural context have been identified highlighting a central issue in existing and future construction practices due to the globalization and thereby increasing importance of cultural understanding in project-based organizing. The empirical findings......This paper presents in-depth case studies of construction practices with a specific focus on understanding the emergent and dynamic nature of construction management in different cultural contexts. The cases are based on actual working-experiences by the author as an assistant project manager...... participating in the construction management on site working for three different contractors in different cultural contexts: (1) Construir Futuro S.A. in Quito, Ecuador; (2) Anker Hansen & co. A/S in Copenhagen, Denmark; and (3) E. Pihl & Soen A/S in Stockholm, Sweden. Based on these explorative case studies...

  2. Construction of the Orsay ACO storage ring, 1: progress report. 2: detecting systems; La construction de l'anneau de stockage ACO d'Orsay, 1: etat des travaux. 2: systemes de detection

    Energy Technology Data Exchange (ETDEWEB)

    Blanc-Lapierre, A; Arzelier, G; Beck, R A; Belbeoch, R; Boutouyrie, B; Bruck, H; Burnod, L; Gendreau, G; Gratreau, P; Haissinski, J; Jolivot, R; Laborde, J; Le Duff, J; Leleux, G; Marin, P C; Milman, B; Sommer, E; Zyngier, H [Laboratoire de l' Accelerateur Lineaire, 91 - Orsay (France); [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires; Augustin, J E; Rumpf, F; Silva, E

    1966-07-01

    1. - A brief progress report is given, with mention of the difficulties solved since the 1963 Dubna Conference and the extra facilities which will be available on the ring (beam observation and measurements); 2. - Typical large solid angle detecting systems and equipment for accurate monitoring under construction at Orsay are also presented. Emphasis is put on some peculiar features at ACO as a tool for physics: long experimental straight section and short length of the bunches. (authors) [French] 1. - Un bref rapport est presente sur l'etat d'avancement du projet ACO en precisant les difficultes resolues depuis la Conference de Dubna en 1963, et les moyens nouveaux mis en place sur l'anneau pour les observations et mesures sur les faisceaux; 2. - Des systemes de detection a grand angle solide et de monitorage precis, en construction a Orsay, sont egalement presentes. On insiste sur quelques traits particuliers d'ACO en tant qu'outil de travail de physique: section droite experimentale longue et paquets courts. (auteurs)

  3. Disposal of spent fuel in Olkiluoto bedrock. Programme for research, development and technical design for the pre-construction phase

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-12-01

    The spent fuel from the nuclear power plants at Olkiluoto and Loviisa will be disposed of in Finnish bedrock. Posiva aims at starting the construction of the disposal facility in the 2010's and the actual disposal operations in 2020. In May 1999 Posiva submitted an application for the so-called Decision-in-Principle (DiP) on the facility to the Finnish Government. According to the application the repository would be based on a KBS-3 type concept and sited at Olkiluoto. The application was approved by the Government in December 2000 and will go next to the Parliament for final approval. However, Posiva has already started the planning for the next programme phase on the assumption that a positive decision will be made. The purpose of the present document is to describe the objectives and major items of research, development, technical planning and design work for the period preceding the construction license. According to the current official guidelines Posiva should prepare for submitting the application for the license in 2010. For the technical development and design work the main target for the starting programme phase is to reach the maturity of design and technical plans that allows the specification of work packages for bid calls and gives sufficient confidence in the technical feasibility of planned operations at the encapsulation facility and in the repository. The main objectives for the complementary characterisation work at Olkiluoto consist of the verification of the present conclusions on site suitability, the definition and identification of suitable rock volumes for repository space and the characterisation of the target host rock for repository design, safety assessment and planning of construction work. The technical design and demonstration work together with the results of complementary site characterisation will provide the basis of the safety case prepared as the support for the construction license application. An integrated safety

  4. Disposal of spent fuel in Olkiluoto bedrock. Programme for research, development and technical design for the pre-construction phase

    International Nuclear Information System (INIS)

    2000-12-01

    The spent fuel from the nuclear power plants at Olkiluoto and Loviisa will be disposed of in Finnish bedrock. Posiva aims at starting the construction of the disposal facility in the 2010's and the actual disposal operations in 2020. In May 1999 Posiva submitted an application for the so-called Decision-in-Principle (DiP) on the facility to the Finnish Government. According to the application the repository would be based on a KBS-3 type concept and sited at Olkiluoto. The application was approved by the Government in December 2000 and will go next to the Parliament for final approval. However, Posiva has already started the planning for the next programme phase on the assumption that a positive decision will be made. The purpose of the present document is to describe the objectives and major items of research, development, technical planning and design work for the period preceding the construction license. According to the current official guidelines Posiva should prepare for submitting the application for the license in 2010. For the technical development and design work the main target for the starting programme phase is to reach the maturity of design and technical plans that allows the specification of work packages for bid calls and gives sufficient confidence in the technical feasibility of planned operations at the encapsulation facility and in the repository. The main objectives for the complementary characterisation work at Olkiluoto consist of the verification of the present conclusions on site suitability, the definition and identification of suitable rock volumes for repository space and the characterisation of the target host rock for repository design, safety assessment and planning of construction work. The technical design and demonstration work together with the results of complementary site characterisation will provide the basis of the safety case prepared as the support for the construction license application. An integrated safety assessment

  5. A brief introduction of the constructing work of national radiation monitoring system during the twelfth five-year

    International Nuclear Information System (INIS)

    Liu Hua; Zhao Yongkang; Pan Su; Zhang Jiali; Yang Bin

    2013-01-01

    Radiation monitoring is the technical groundwork of nuclear and radiation safety regulating. In order to overcome the challenges coming with the development of nuclear energy and technology in china, the program of constructing National Radiation Monitoring System (NRMS) was put forward in the twelfth five-year plan of nuclear safety and prevention of radiation pollution, and the view target in 2020. The implementation plan of the constructing of NRMS has been drew up by the Ministry of Environmental Protection in 2012, which including the construction of organization and human resource system, laws and standards system, quality assurance system, technical research and innovation system, and capability insurance system. A brief introduction of the implementation plan was given in the article, the achievements during the eleventh five-year were reviewed, the challenges and working points were analyzed. (authors)

  6. Continued Progression, Work and Teaching as a Profession Progressão Continuada, Trabalho e Profissão Docente.

    Directory of Open Access Journals (Sweden)

    Ivanise Monfredini

    2009-03-01

    Full Text Available In Brazil, the expansion of basic school is recent. It occurs from mid-twentieth century, and it was intensified in the last three decades. The "neoliberal" educational policies implemented during the years of 1990, had reaffirmed, as their intention, teachers' ideals and efforts, and, among them, "a quality school for all", using the concept of "inclusive school". Considering the sixty years period of expansion of elementary school's attendance, we carried a socio-historical research, analyzing critically the consequences of the continued progression, a program that was implemented during the `neo-liberal´ reform of Brazilian state. We verified the development of the figure of the desisting teacher in actuation, a process mediated by the school culture and by the adoption of the continued progression system without any changes in the precarious working conditions. We begin by presenting the culture of the research site, the first gymnasium founded in the São Paulo city, using the School Plan, which synthesizes different temporalities related to the formation of the current "Second Cycle" and of the teachers that act at this level of education. The analysis, also supported by interviews with sixteen teachers, has showed the consequences and teaching profession. No Brasil a expansão da escola básica é recente. Ocorre a partir de meados do século XX, intensificando-se nas últimas três décadas. As políticas educacionais ?neoliberais?, implementadas nos anos de 1990, tiveram a pretensão de realizar ideais históricos dos professores; dentre eles, o de ?escola de qualidade para todos?, por meio do conceito de ?escola inclusiva?. Considerando o período de 60 anos de ampliação no atendimento no ensino fundamental, realizamos uma pesquisa sócio-histórica, analisando criticamente as conseqüências da progressão continuada, programa implementado no âmbito da reforma ?neoliberal? do Estado brasileiro. Constatamos a formação do

  7. Applying Item Response Theory methods to design a learning progression-based science assessment

    Science.gov (United States)

    Chen, Jing

    Learning progressions are used to describe how students' understanding of a topic progresses over time and to classify the progress of students into steps or levels. This study applies Item Response Theory (IRT) based methods to investigate how to design learning progression-based science assessments. The research questions of this study are: (1) how to use items in different formats to classify students into levels on the learning progression, (2) how to design a test to give good information about students' progress through the learning progression of a particular construct and (3) what characteristics of test items support their use for assessing students' levels. Data used for this study were collected from 1500 elementary and secondary school students during 2009--2010. The written assessment was developed in several formats such as the Constructed Response (CR) items, Ordered Multiple Choice (OMC) and Multiple True or False (MTF) items. The followings are the main findings from this study. The OMC, MTF and CR items might measure different components of the construct. A single construct explained most of the variance in students' performances. However, additional dimensions in terms of item format can explain certain amount of the variance in student performance. So additional dimensions need to be considered when we want to capture the differences in students' performances on different types of items targeting the understanding of the same underlying progression. Items in each item format need to be improved in certain ways to classify students more accurately into the learning progression levels. This study establishes some general steps that can be followed to design other learning progression-based tests as well. For example, first, the boundaries between levels on the IRT scale can be defined by using the means of the item thresholds across a set of good items. Second, items in multiple formats can be selected to achieve the information criterion at all

  8. Introducing the electronic patient record (EPR) in a hospital setting: boundary work and shifting constructions of professional identities.

    Science.gov (United States)

    Håland, Erna

    2012-06-01

    Today's healthcare sector is being transformed by several ongoing processes, among them the introduction of new technologies, new financial models and new ways of organising work. The introduction of the electronic patient record (EPR) is representative and part of these extensive changes. Based on interviews with health personnel and office staff in a regional hospital in Norway, and with health administrators and information technology service-centre staff in the region, the article examines how the introduction of the EPR, as experienced by the participants, affects the work practices and boundaries between various professional groups in the healthcare system and discusses the implications this has for the understanding of medical practice. The article shows how the EPR has become part of the professionals' boundary work; expressing shifting constructions of professional identities. © 2011 The Author. Sociology of Health & Illness © 2011 Foundation for the Sociology of Health & Illness/Blackwell Publishing Ltd.

  9. Allergy-related disorders in the construction industry.

    Science.gov (United States)

    Carino, Mauro; Romita, Paolo; Foti, Caterina

    2013-01-01

    Working conditions in the construction industry have improved in many industrialized countries, but heavy physical work with recurrent exposure to chemical agents, dust, and climatic influences still represents considerable risk for construction workers and may affect their health. The aim of this review is to analyze available data of the literature on allergy-related respiratory and skin disorders with emphasis on a preventive appraisal in order to produce statements and recommendations based on research evidence. The most common agents involved in the construction industry as a cause of occupational asthma (OA) in industrialized countries are isocyanates, wood dust, resins, glues, cobalt, and chromium. Allergic contact dermatitis (ACD) is an immunologic cell-mediated response to a sensitizing agent and the most common sensitizing agents associated with construction workers are epoxy resins, thiurams and thiazoles, and chromates. Medical surveillance must consider individual risk factors such as differences in individual susceptibility and sensitization to agents at workplace. Once work-related disorder is confirmed, adequate fitness for work should be assessed for the worker impaired by health condition. A reliable diagnosis of an index case is a sentinel event that may reveal risks for workers with similar exposure, leading to a revised risk assessment at the workplace that should reduce the risk and prevent further cases.

  10. [The accident at work and the occupational diseases in the construction industry: the experience of Inail].

    Science.gov (United States)

    Clemente, M; Goggiamani, A

    2012-01-01

    The authors analyze the budget accident at work and occupational diseases in the construction industry through the data banks Inail. This analysis is carried out by comparing the data for this sector of economic activity (classification of economic activities ATECO 2002) with those general with particular attention to how an event, occurrence, mortality, by plotting the trends of this phenomenon than in previous years. It also analyzes the phenomenon of the complaints of occupational diseases with the comparison with the general data as well as with the analysis of the most frequent types of occupational diseases in this sector in the last two years.

  11. PECULIARITIES OF CONSTRUCTION OF INSTITUTIONS OF SECONDARY EDUCATION IN MOSCOW IN THE 1920IES AND 1930IES

    Directory of Open Access Journals (Sweden)

    Byzova Ol'ga Mikhaylovna

    2012-10-01

    Full Text Available Actions aimed at the generality of elementary education in the course of the period days of the industrialization and cultural revolution in the USSR is under discussion in the proposed paper. On the basis of the archived documents, organization of construction of school buildings in Moscow in the 20ies and 30ies of the 20th century is analyzed. It is noteworthy that industrialization in the periods of the first, second and third five-year plans reshaped the country and Moscow as its capital. Former suburbs turned into large industrial areas that had giant factories and housing built around them to accommodate workers. Thus, the population of Moscow grew in numbers. The need for competent staff facilitated construction of new schools. Peculiarities of school construction in Moscow within the first five-year plan are considered in article on the basis of a school building in Likhobory in 1932. The school building design, work progress, assembly and interior, deadlines and problems of construction are specified. It is noteworthy that, despite any difficulties, 19 new school buildings were completed in Moscow in the years of the first five-year plan. Classes were organized according to the principle of two shifts to implement the general education programme in 1932.

  12. Using Voice, Meaning, Mutual Construction of Knowledge, and Transfer of Learning to Apply an Ecological Perspective to Group Work Training

    Science.gov (United States)

    Orr, Jonathan J.; Hulse-Killacky, Diana

    2006-01-01

    Concepts of voice, meaning, mutual construction of knowledge, and transfer of learning are presented in this paper as critical ingredients that support the teaching of group work from an ecological perspective. Examples of these concepts are given to illustrate their application in group work classes. (Contains 1 table.)

  13. Concrete construction engineering handbook

    CERN Document Server

    Nawy, Edward G

    2008-01-01

    Provides coverage of concrete construction engineering and technology. This work features discussions focusing on: the advances in engineered concrete materials; reinforced concrete construction; specialized construction techniques; and, design recommendations for high performance.

  14. The construction of a PWR power station reactor building liner

    International Nuclear Information System (INIS)

    Skirving, N.; Goulding, J.S.; Gibson, J.A.

    1991-01-01

    Cleveland Bridge and Engineering Co Ltd (CBE) are constructing the Reactor Building Liner Plate containment of the Sizewell 'B' Power Station for Nuclear Electric Ltd. This has entailed extensive offsite prefabrication of components and their subsequent erection at Sizewell. It has been necessary to engineer temporary supporting mechanisms to enable manufacture and erection to proceed, yet also to withstand wet concrete forces during the progressive construction. The Reactor Building Liner Plate is a safety related system and as such, in addition to strict compliance with the ASME code, the Quality Assurance (QA) requirements of BS 5882 are applicable. A dedicated Project Team was established by CBE to control and direct the work. Equally important as satisfying the rigorous Q.A. requirements has been the need to meet programme and budget. This paper details CBE execution of the Project. (author)

  15. Order in progressive construction: Manifestation based on housing in two barrios (slums) of the city of Caracas

    OpenAIRE

    Zambrano, Andres

    2012-01-01

    In Venezuela, the name of “barrio” is given to the housing agglomeration set without any city-planning order on a land area that, most of the times, has been illegally occupied. In the barrio zones it is the family that undertakes, from the beginning, the gradual construction of its house, without any intermediary and with scarcely qualified construction workers. This dynamic occupation and following house construction is part of many Venezuelan cities’ growth. In this context, featured by th...

  16. The effectiveness of a construction worksite prevention program on work ability, health, and sick leave: Results from a cluster randomized controlled trial

    NARCIS (Netherlands)

    Oude Hengel, K.M.; Blatter, B.M.; Molen, H.F. van der; Bongers, P.M.; Beek, A.J. van der

    2013-01-01

    Objective This study aimed to investigate the effectiveness of a prevention program on work ability, health, and sick leave targeted at construction worksites. Methods A total of 15 departments (N=297 workers) from 6 construction companies participated in this cluster randomized controlled trial and

  17. Quantitative Identification of Construction Risk

    OpenAIRE

    Kasprowicz T.

    2017-01-01

    Risks pertaining to construction work relate to situations in which various events may randomly change the duration and cost of the project or worsen its quality. Because of possible significant changes of random events, favorable, moderate, and difficult conditions of construction work are considered. It is the first stage of the construction risk analysis. The probabilistic parameters of construction are identified and described by using the design characteristics model of the structure and...

  18. A century of progress in industrial and organizational psychology: Discoveries and the next century.

    Science.gov (United States)

    Salas, Eduardo; Kozlowski, Steve W J; Chen, Gilad

    2017-03-01

    In a century of research published in the Journal of Applied Psychology , we have seen significant advances in our science. The results of this science have broad applications to the workplace and implications for improving organizational effectiveness through a variety of avenues. Research has focused on understanding constructs, relationships, and processes at multiple levels, including individual, team, and organizational. A plethora of research methods and questions have driven this work, resulting in a nuanced understanding of what matters in the workplace. In this paper, we synthesize the most salient discoveries, findings, and/or conclusions in 19 domains. We seek to summarize the progress that has been made and highlight the most salient directions for future work such that the next century of research in industrial and organizational psychological science can be as impactful as the first century has been. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  19. Toronto green roof construction standard

    International Nuclear Information System (INIS)

    Aster, D.

    2007-01-01

    Toronto City Council adopted a green roof strategy in February 2006. This paper reviewed the by-law governing the strategy as well as the work in progress to develop minimum standards for the design and construction of green roofs in Toronto. The strategy included a series of recommendations regarding the installation of green roofs on city buildings; a pilot grant program; using the development process to encourage green roofs; and, public education and promotion. It was noted that compared to Europe, the development of standards for green roofs in North America is in its early stages. As an emerging sustainable technology, there currently are no standards incorporated into Ontario's Building Code against which Toronto can measure the design and construction of green roofs. Therefore this paper included an analysis detailing how the recommended design requirements were able to support the City's green roof policy objectives and integrate the performance criteria for green roofs previously established and supported by Toronto City Council. The key policy objectives of the City's green roof strategy were to reduce the urban heat island effect; to address stormwater management implications in terms of quality and quantity; to improve the energy budgets of individual buildings; and, to improve air quality

  20. The use of area-oriented work breakdown structures in developments of EPC of process unit; Emprego de estruturas analiticas de projeto orientadas por area fisica em empreendimentos EPC (Engineering, Procurement and Construction) de unidade de processo

    Energy Technology Data Exchange (ETDEWEB)

    Salloum, Joao; Balbi, Diego J.G. [Promon Engenharia Ltda., Rio de Janeiro, RJ (Brazil)

    2012-07-01

    The use of area-oriented work breakdown structures has been proven as a very useful tool for supporting the 'scope detailing' processes in construction projects. This practice allows the definition of intermediate work packages, assisting in the distribution of the scope to be executed within the different team members (or subcontractors), and also allowing the definition of a basic construction strategy based on the main project constraints reflected in each physical area (delivery lead-time of long lead items, for example), to be used as a guide for developing a preliminary master schedule for engineering e procurement activities with a better alignment with the construction strategy. In this way the detailed engineering activities can be developed based on this structure allowing, for example, the possibility of issue piping isometrics and plants under this structure. It's common to split the scope according to the physical location on the eve of starting the field activities as a way to identify the workfaces at the time of the development of 'execution plans' for field activities. However, since this stage much of the engineering activities are already in progress, or even completed, the likelihood of conflicting strategies, such as choosing to start the installation of piping in areas that do not have availability of design documents or required material is considerably higher. Therefore, this study has the intention to discuss about the use of this practice in the early stages of the detailed engineering phase and show the practical impacts of the application of this concept, showing the results obtained with this strategy in oil refining process plant EPC project carried out by Promon Engineering. (author)

  1. Progression in Ethical Reasoning When Addressing Socio-scientific Issues in Biotechnology

    Science.gov (United States)

    Berne, Birgitta

    2014-11-01

    This article reports on the outcomes of an intervention in a Swedish school in which the author, a teacher-researcher, sought to develop students' (14-15 years old) ethical reasoning in science through the use of peer discussions about socio-scientific issues. Prior to the student discussions various prompts were used to highlight different aspects of the issues. In addition, students were given time to search for further information themselves. Analysis of students' written arguments, from the beginning of the intervention and afterwards, suggests that many students seem to be moving away from their use of everyday language towards using scientific concepts in their arguments. In addition, they moved from considering cloning and 'designer babies' solely in terms of the present to considering them in terms of the future. Furthermore, the students started to approach the issues in additional ways using not only consequentialism but also the approaches of virtue ethics, and rights and duties. Students' progression in ethical reasoning could be related to the characteristics of the interactions in peer discussions as students who critically and constructively argued with each other's ideas, and challenged each other's claims, made progress in more aspects of ethical reasoning than students merely using cumulative talk. As such, the work provides valuable indications for the importance of introducing peer discussions and debates about SSIs in connection to biotechnology into the teaching of science in schools.

  2. Challenges in Construction Over Soft Soil - Case Studies in Malaysia

    Science.gov (United States)

    Mohamad, N. O.; Razali, C. E.; Hadi, A. A. A.; Som, P. P.; Eng, B. C.; Rusli, M. B.; Mohamad, F. R.

    2016-07-01

    Construction on soft ground area is a great challenge in the field of geotechnical engineering. Many engineering problems in the form of slope instability, bearing capacity failure or excessive settlement could occur either during or after the construction phase due to low shear strength and high compressibility of this soil. As main technical agencies responsible for implementation of development projects for Government of Malaysia, Public Works Department has vast experience in dealing with this problematic soil over the years. This paper discussed and elaborate on the engineering problems encountered in construction projects that have been carried out by PWD, namely Core Facilities Building of Polytechnic Kota Kinabalu in Sabah and Hospital Tengku Ampuan Rahimah Integration Quarters in Klang, Selangor. Instability of the ground during construction works had caused delay and cost overrun in completion of the project in Selangor, whereas occurrence of continuous post construction settlement had affected the integrity and serviceability of the building in Sabah. The causes of failure and proposed rehabilitation work for both projects also will be discussed in brief.

  3. Factors Influencing Tacit Knowledge in Construction

    Directory of Open Access Journals (Sweden)

    Jawahar Nesan

    2012-11-01

    Full Text Available Increased complexity of the construction business and consequentuse of new management concepts and technologies ledconstruction organisations to focus more on the transfer of explicitknowledge. However, it is the tacit knowledge that determinesthe construction companies’ competitiveness in a business thatis driven by turbulent market conditions and customers’ everincreasingdemands. This paper highlights the importance of tacitknowledge sharing in construction, explores the challenges andopportunities to efficiently share tacit knowledge, and based on theliterature review identifies some critical factors that influence tacitknowledge in construction. It is argued that employees’ knowledgesharing (learning behaviours are influenced by work practices thatare borne by respective organisational behaviours. Organisational,cultural, and project characteristics that facilitate knowledgesharing among construction employees are explored and thepractices that influence the construction employee behaviour insharing tacit knowledge are highlighted.

  4. [Occupational injuries among construction workers in Hong Kong].

    Science.gov (United States)

    Huang, Zihui; Chen, Weiqing

    2002-02-01

    To explore the nature and severity of occupational injuries among construction workers and its risk factors in Hong Kong. One hundred and twenty-two injured construction workers in a public hospital and an equal number of workmate controls were studied. Contents included socio -demographic characteristics, the availability and use of safety equipment, smoking and alcohol consumption, etc. Abbreviated injury scale (AIS) and injury severity score (ISS) were employed for describing the nature, pattern and severity of injuries. Single injuries were seen in 80% of cases. Of 149 injuries classified by body region, 49% were external, 26% involved either the upper or lower extremities, and 11% were spinal injuries. Working at height was associated with the injury severity score. Safety hazards were identified in the work environment in 68% of the cases. Significant odds ratios for accidents were obtained for 'no formal education', 'non safety training' and 'current smokers'. The results implicated that construction was a hazardous occupation in Hong Kong. Improving the work environment and promoting safety education among construction workers would be helpful for minimizing or eliminating occupational injuries in construction occupation in Hong Kong.

  5. Determination of Constructs and Dimensions of Employability Skills Based Work Performance Prediction: A Triangular Approach

    OpenAIRE

    Rahmat, Normala; Buntat, Yahya; Ayub, Abdul Rahman

    2015-01-01

    The level of the employability skills of the graduates as determined by job role and mapped to the employability skills, which correspond to the requirement of employers, will have significant impact on the graduates’ job performance. The main objective of this study was to identify the constructs and dimensions of employability skills, which can predict the work performance of electronic polytechnic graduate in electrical and electronics industry. A triangular qualitative approach was used i...

  6. Sex work and the construction of intimacies: meanings and work pragmatics in rural Malawi.

    Science.gov (United States)

    Tavory, Iddo; Poulin, Michelle

    2012-05-01

    This article focuses on Malawian sex workers' understandings of exchange and intimacy, showing how multiple historically emergent categories and specific work pragmatics produce specific patterns of relational meanings. As we show, sex workers make sense of their relationships with clients through two categories. The first is sex work; the second is the chibwenzi , an intimate premarital relational category that emerged from pre-colonial transformations in courtship practices. These categories, in turn, are also shaped differently in different work settings. We use narratives from in-depth interviews with 45 sex workers and bar managers in southern Malawi to describe how the everyday pragmatics of two forms of sex work-performed by "bargirls" and "freelancers"-foster distinct understandings of relationships between them and men they have sex with. Bargirls, who work and live in bars, blurred the boundaries between "regulars" and chibwenzi; freelancers, who are not tethered to a specific work environment, often subverted the meanings of the chibwenzi , presenting these relationships as both intimate and emotionally distant. Through this comparison, we thus refine an approach to the study of the intimacy-exchange nexus, and use it to capture the complexities of gender relations in post-colonial Malawi.

  7. Cross-cultural comparison of concrete recycling decision-making and implementation in construction industry.

    Science.gov (United States)

    Tam, Vivian W Y; Tam, Leona; Le, Khoa N

    2010-02-01

    Waste management is pressing very hard with alarming signals in construction industry. Concrete waste constituents major proportions of construction and demolition waste of 81% in Australia. To minimize concrete waste generated from construction activities, recycling concrete waste is one of the best methods to conserve the environment. This paper investigates concrete recycling implementation in construction. Japan is a leading country in recycling concrete waste, which has been implementing 98% recycling and using it for structural concrete applications. Hong Kong is developing concrete recycling programs for high-grade applications. Australia is making relatively slow progress in implementing concrete recycling in construction. Therefore, empirical studies in Australia, Hong Kong, and Japan were selected in this paper. A questionnaire survey and structured interviews were conducted. Power spectrum was used for analysis. It was found that "increasing overall business competitiveness and strategic business opportunities" was considered as the major benefit for concrete recycling from Hong Kong and Japanese respondents, while "rising concrete recycling awareness such as selecting suitable resources, techniques and training and compliance with regulations" was considered as the major benefit from Australian respondents. However, "lack of clients' support", "increase in management cost" and "increase in documentation workload, such as working documents, procedures and tools" were the major difficulties encountered from Australian, Hong Kong, and Japanese respondents, respectively. To improve the existing implementation, "inclusion of concrete recycling evaluation in tender appraisal" and "defining clear legal evaluation of concrete recycling" were major recommendations for Australian and Hong Kong, and Japanese respondents, respectively.

  8. Cross-cultural comparison of concrete recycling decision-making and implementation in construction industry

    International Nuclear Information System (INIS)

    Tam, Vivian W.Y.; Tam, Leona; Le, Khoa N.

    2010-01-01

    Waste management is pressing very hard with alarming signals in construction industry. Concrete waste constituents major proportions of construction and demolition waste of 81% in Australia. To minimize concrete waste generated from construction activities, recycling concrete waste is one of the best methods to conserve the environment. This paper investigates concrete recycling implementation in construction. Japan is a leading country in recycling concrete waste, which has been implementing 98% recycling and using it for structural concrete applications. Hong Kong is developing concrete recycling programs for high-grade applications. Australia is making relatively slow progress in implementing concrete recycling in construction. Therefore, empirical studies in Australia, Hong Kong, and Japan were selected in this paper. A questionnaire survey and structured interviews were conducted. Power spectrum was used for analysis. It was found that 'increasing overall business competitiveness and strategic business opportunities' was considered as the major benefit for concrete recycling from Hong Kong and Japanese respondents, while 'rising concrete recycling awareness such as selecting suitable resources, techniques and training and compliance with regulations' was considered as the major benefit from Australian respondents. However, 'lack of clients' support', 'increase in management cost' and 'increase in documentation workload, such as working documents, procedures and tools' were the major difficulties encountered from Australian, Hong Kong, and Japanese respondents, respectively. To improve the existing implementation, 'inclusion of concrete recycling evaluation in tender appraisal' and 'defining clear legal evaluation of concrete recycling' were major recommendations for Australian and Hong Kong, and Japanese respondents, respectively.

  9. When workplace bullying goes online : construction and validation of the Inventory of Cyberbullying Acts at Work (ICA-W)

    OpenAIRE

    Vranjes, Ivana; Baillien, Elfi; Vandebosch, Heidi; Erreygers, Sara; Witte, De, Hans

    2018-01-01

    Abstract: There has been an increase in the use of Information Communication Technologies in the workplace. This change extends the scope of bullying behaviours at work to the online context. However, a generally accepted measure of workplace cyberbullying is still lacking. The purpose of the present paper is to construct and validate the Inventory of Cyberbullying Acts at Work, in order to contribute to this emerging field. Building on existing knowledge, we expected three types of cyberbull...

  10. Design and construction of earth retaining walls with anchors employed in excavation works at Oi Nuclear Power Plant

    International Nuclear Information System (INIS)

    Saino, Susumu; Aoshima, Ken-ichiro; Kamide, Atsushi.

    1990-01-01

    In Oi Nuclear Power Station, Kansai Electric Power Co., Inc., No.3 and No.4 plants of each 1180 MWe output are additionally installed, neighboring existing No.1 and No.2 plants of each 1175 MWe output in operation. The start of operation is expected in December, 1991 in No.3 plant, and in February, 1993 in No.4 plant. The total quantity of earth excavated for this additional installation works is about 3.3 million m 3 . The main works are, subsequently to the preparation of the site, the excavation for the foundations of reactor buildings and others, and the construction of the foundations for the seawater system facilities for cooling condensers and reactor auxiliary machines, and the works were begun in May, 1987. The excavation by using anchors was carried out in seven places. The vertical excavation on large scale was carried out by using the earth retaining walls of concrete-sprayed anchor structure in drain pits. In this report, the outline of the geological features, the outline of the excavation works, the design of the earth retaining walls, the execution of concrete spraying, the planning and result of measurement are described. (K.I.)

  11. Progress and Prospects in Developing Marine Vertical Datum

    Directory of Open Access Journals (Sweden)

    ZHOU Xinghua

    2017-10-01

    Full Text Available Marine vertical datum system construction is the basic work of marine surveying. In the 2009-2012, China has preliminarily constructed the transformation and unification of different height/depth datum model in the China Sea of 80 nautical mile. In recent years, this model has been extended to the South China Sea, the western Pacific and the eastern Indian Ocean, and then a seamless vertical datum model in the south and north pole area to the whole world gradually will be constructed in the near future, this is the foundation of supporting the digital ocean construction in China. This paper mainly discusses the research status of marine vertical datum construction which had been carried out in major coastal countries or regions, analyzes the main work and approaches and key technologies in the process of the marine vertical datum system building, and then expounds the achievements and existing problems in the practice of our country marine vertical datum building.

  12. Combinatorial designs constructions and analysis

    CERN Document Server

    Stinson, Douglas R

    2004-01-01

    Created to teach students many of the most important techniques used for constructing combinatorial designs, this is an ideal textbook for advanced undergraduate and graduate courses in combinatorial design theory. The text features clear explanations of basic designs, such as Steiner and Kirkman triple systems, mutual orthogonal Latin squares, finite projective and affine planes, and Steiner quadruple systems. In these settings, the student will master various construction techniques, both classic and modern, and will be well-prepared to construct a vast array of combinatorial designs. Design theory offers a progressive approach to the subject, with carefully ordered results. It begins with simple constructions that gradually increase in complexity. Each design has a construction that contains new ideas or that reinforces and builds upon similar ideas previously introduced. A new text/reference covering all apsects of modern combinatorial design theory. Graduates and professionals in computer science, applie...

  13. Advanced design and construction technology for ABWR

    International Nuclear Information System (INIS)

    Kawahara, Akira

    2003-01-01

    Recently, many countries start planning to construct nuclear plants, and the electric power companies and the plant suppliers are acutely aware of the importance of the technical infrastructure required for construction planning and execution as this has a significant influence on construction costs. Plant suppliers in Japan have been focusing its attention on the efficiency of construction from earlier, because of its significant role in determining overall construction costs. Through continuous efforts to reduce fieldwork costs, we have developed unique technologies, especially the 3D-CAD system and other advanced construction technologies including modularization. We, plant suppliers are now turning its attention to overseas nuclear plants construction also, and are developing more rational, economical, and global construction based on its vast experience in construction techniques. In this report, the evolution of plant engineering methods and construction technologies, the present level of progress in construction, and technical developments for the future, are described. (author)

  14. Modular construction of nuclear power plants in Korea and technical issues - 15051

    International Nuclear Information System (INIS)

    Kim, T.I.; Kim, K.K.; Yoon, J.J.; Han, G.E.

    2015-01-01

    The construction of nuclear power plants (NPPs) is the process of installing structures, systems and components (SCCs) of NPPs within a targeted time and a budget while ensuring quality and safety. Recently various efforts have been made in the nuclear industry to construct NPPs more effectively and modular construction has been highlighted as one of the most effective methods. Modular construction has been known to be effective in reducing construction time, allocating labor and equipment more efficiently while ensuring quality. The installation of structures and systems requires stable provision of labor force which is essential to keep the installation work of bulk materials such as re-bars, pipes and so forth in a construction site over a long period. Especially, in the case of the structure work, it is greatly affected by weather conditions such as rainfall, snow and wind, and discontinuity of installation work due to weather is directly related with success of a construction project. The most significant feature of modular construction is that SSCs could be pre-fabricated at an off-site factory or an assembly shop near a construction site, which provides stable labor force and favorable work condition impervious to weather. Reinforced concrete is largely used in NPPs and re-bar and form works are time consuming requiring lots of labor force at a construction site. Various efforts have been made to install re-bars and forms at the same time, which led to the development of SC structures. SC structures are composed of face steel plates which work as forms for concrete pouring as well as reinforcement for concrete. In this paper, we are going to introduce module types applicable to construction of NPPs and the status of modular construction in Korea. In addition, several issues will be addressed for the successful application of modular construction

  15. Progress in the design and construction of SPES at INFN-LNL

    International Nuclear Information System (INIS)

    Bisoffi, G.; Prete, G.; Andrighetto, A.; Andreev, V.; Bellan, L.; Bellato, M.; Bortolato, D.; Calderolla, M.; Canella, S.; Comunian, M.; Corradetti, S.; Fagotti, E.; Facco, A.; Favaron, P.; Ferrari, L.; Galatà, A.; Giacchini, M.; Gramegna, F.; Gulmini, M.; Lombardi, A.

    2016-01-01

    INFN-LNL is constructing an ISOL (Isotope Separation On Line) facility delivering neutron rich ion beams at 10 A MeV or beyond, making use of the linear accelerator ALPI as the secondary accelerator. The facility includes a direct ISOL target based on UC_x and able to reach 10"1"3 fissions/s. In parallel, an applied physics facility will be developed, with applications in medicine and neutron production. The SPES project is a national facility, approved and funded. Commissioning with the first exotic species is expected in 2019. The primary accelerator is a commercial cyclotron, which will send a 40 MeV, 200 μA proton beam onto an UC_x target, connected to SIS, PIS and LIS ion sources. The extracted beam is purified through a Low Resolution Mass Separator (LMRS, i.e. a Wien filter and a dispersive dipole), a beam cooler and a High Resolution Mass Separator (HRMS) and sent to an ECR charge breeder to boost the exotic beam charge state. The highly charged exotic beam is further separated in a MRMS (Medium Resolution Mass Separator) and injected into a 100% duty cycle RFQ and into the existing superconducting linac ALPI, which will be refurbished and upgraded to be an efficient exotic beam accelerator. The upgrade of ALPI will give ∼10 A MeV energy to "1"3"2Sn"1"9"+, taken as the reference ion beam. The paper presents the status of the design and construction of the SPES facility.

  16. Progress in the design and construction of SPES at INFN-LNL

    Energy Technology Data Exchange (ETDEWEB)

    Bisoffi, G.; Prete, G.; Andrighetto, A. [INFN-LNL, viale dell’Università 2, 35020 Legnaro (Padova) (Italy); Andreev, V. [ITEP, Bolshaya Cheremushkinskaya, 25, 117218 Moskva (Russian Federation); Bellan, L. [INFN-LNL, viale dell’Università 2, 35020 Legnaro (Padova) (Italy); Dipartimento di Fisica e Astronomia, Università degli Studi di Padova, Padova (Italy); Bellato, M. [INFN-Sezione di Padova, Via Marzolo, 8, 35131 Padova (Italy); Bortolato, D.; Calderolla, M.; Canella, S.; Comunian, M.; Corradetti, S.; Fagotti, E.; Facco, A.; Favaron, P. [INFN-LNL, viale dell’Università 2, 35020 Legnaro (Padova) (Italy); Ferrari, L. [INFN-Sezione di Padova, Via Marzolo, 8, 35131 Padova (Italy); Galatà, A.; Giacchini, M.; Gramegna, F.; Gulmini, M.; Lombardi, A. [INFN-LNL, viale dell’Università 2, 35020 Legnaro (Padova) (Italy); and others

    2016-06-01

    INFN-LNL is constructing an ISOL (Isotope Separation On Line) facility delivering neutron rich ion beams at 10 A MeV or beyond, making use of the linear accelerator ALPI as the secondary accelerator. The facility includes a direct ISOL target based on UC{sub x} and able to reach 10{sup 13} fissions/s. In parallel, an applied physics facility will be developed, with applications in medicine and neutron production. The SPES project is a national facility, approved and funded. Commissioning with the first exotic species is expected in 2019. The primary accelerator is a commercial cyclotron, which will send a 40 MeV, 200 μA proton beam onto an UC{sub x} target, connected to SIS, PIS and LIS ion sources. The extracted beam is purified through a Low Resolution Mass Separator (LMRS, i.e. a Wien filter and a dispersive dipole), a beam cooler and a High Resolution Mass Separator (HRMS) and sent to an ECR charge breeder to boost the exotic beam charge state. The highly charged exotic beam is further separated in a MRMS (Medium Resolution Mass Separator) and injected into a 100% duty cycle RFQ and into the existing superconducting linac ALPI, which will be refurbished and upgraded to be an efficient exotic beam accelerator. The upgrade of ALPI will give ∼10 A MeV energy to {sup 132}Sn{sup 19+}, taken as the reference ion beam. The paper presents the status of the design and construction of the SPES facility.

  17. Karlsruhe Nuclear Research Center. Progress report on research and development work in 1987

    International Nuclear Information System (INIS)

    1988-01-01

    This summary of R and D work is the scientific annual report to be prepared by the research center in compliance with its statutes. The material is arranged by items of main activities, as given in the overall R and D programme set up for the research center. The various reports prepared by the individual institutes and principal departments are presented under their relevant subject headings. The annual report is intended to demonstrate the progress achieved in the tasks and activities assigned by the R and D programme of the research center, by referring to the purposes and goals stated in the programme, showing the joint or separate efforts and achievements of the institutes. Details and results of activities are found in the scientific-technical publications given in the bibliographical survey, and in the internal primary surveys. The main activities of the research center include the following: Fast Breeder Project (PSB), Nuclear Fusion Project (PKF), Separation Nozzle Project (TDV), and Reprocessing and Waste Treatment Project (PWA), Ultimate Disposal of Radioactive Waste (ELA), Environment and Safety (U and S), Solids and Materials (FM), Nuclear and Particle Physics (KTP), Microtechniques (MT), Materials Handling (HT), Other Research Activities (SF). Organisational aspects and institutes and the list of publications conclude the report. (orig./HK) [de

  18. Optimal tax progressivity in imperfect labour markets

    DEFF Research Database (Denmark)

    Sørensen, Peter Birch

    1999-01-01

    that there may be an optimal degree of tax progressivity where the marginal welfare gain from reduced involuntary unemployment is just offset by the marginal welfare loss from lower productivity. This paper sets up four different models of an imperfect labour market in order to identify the degree of tax......All modern labour market theories capable of explaining involuntary unemployment as an equilibrium phenomenon imply that increased income tax progressivity reduces unemployment, but they also imply that higher progressivity tends to reduce work effort and labour productivity. This suggests...

  19. Construction project of Flamanville 3 NPP. The participation of Iberdrola engineering and Construction

    International Nuclear Information System (INIS)

    Diaz Prada, J. I.; Cubian, B.

    2014-01-01

    Iberdrola Engineering and Construction (IIC) leads several projects mini EPC for the EPR Flamanville 3 NPP for providing important for safety components and auxiliary systems in the pump house and in the turbine island. The realization of this new nuclear project has been a challenge from the technical and organizational perspective because the plant is the first of the new nuclear station (FDAKE) type EPR 1700 MWe series in a highly restrictive environment due to to the large number of particular requirements from the final customer and the meager degree of progress of the design to the date of commencement of construction. (Author)

  20. French codes and standards for design, construction and in-service inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Hugot, G.; Grandemange, J. M.

    1995-01-01

    In 1970, France decided that its future power plants would be of the Pressurized Water Reactor type. This choice proved to be successful since it resulted in more than 60 PWR units in operation or under construction in France and abroad. At the beginning of such a program, the French engineering and manufacturing industry, the national electrical utility and the Safety Authorities had to face the many challenges imposed by the implementation of an imported technology. The government reorganised the licensing process. FRAMATOME, the NSSS vendor, and EDF (Electricite de France), the national utility, decided to create 'AFCEN', the French Association for Design and Construction Rules for Nuclear Island Components. These rules, the RCC's (Regles de Construction et de conception), which are approved by French Safety Authorities deal with mechanical and electrical equipment as well as with nuclear fuel and civil works. They are now being supplemented by in service inspection rules, the RSE's (Regles d'inspection en Service). The paper presents these Codes and their main updating following experience of application, technical progress and evolution of standards. Status of discussion concerning reference to European standardisation and developments of rules applicable to the EPR project will also be discussed

  1. CONSTRUCTING ORGANIZATIONAL DISCOURSE. A SYMBOLIC ACTION IN IMPROVING WORK

    Directory of Open Access Journals (Sweden)

    Alexandra GALBIN

    2015-04-01

    Full Text Available Social constructionism, a postmodern approach with epistemological assumptions, brings new resources for organizational interventions. A key element in organizational development, the discourse plays an important role in fashioning the future of this. This article presents the organizational discourse as a symbolic action in which discourse influence behavior of members and reinforces mindsets. Discourse shapes the relations between individuals, and creates mental frames. Create change by changing the discourse generates fresh new possibilities and innovative forms to look at a situation. Constructing a positive organizational discourse offers a great potential for social change and address challenges and advances thinking in the organizational field.

  2. Research on construction quality and improvement of assembly construction

    Science.gov (United States)

    Cheng, Fei

    2017-11-01

    Based on the acceleration of the urbanization process and the improvement of the quality of life of our residents, the demand for building construction has been increasing. In this context, the construction industry in order to promote the construction efficiency, quality improvement, to meet the needs of the development of the times to strengthen the new technology, the use of new technologies. At present, China’s engineering construction units in the process of carrying out the project to strengthen the use of assembly-type construction technology, which thus achieved for the traditional construction work low-level, high time-consuming issues, and promote the steady improvement of production efficiency. Based on this, this paper focuses on the analysis of the connotation of the assembly structure and analyzes the quality problems in the construction process of the construction projects and puts forward the improvement measures to promote the improvement of the building quality and the construction of the building Construction speed. Based on this, this paper analyzes the structural system and design of prefabricated building.

  3. Tunneling progress on the Yucca Mountain Project

    International Nuclear Information System (INIS)

    Hansmire, W.H.; Munzer, R.J.

    1996-01-01

    The current status of tunneling progress on the Yucca Mountain Project (YMP) is presented in this paper. The Exploratory Studies Facility (ESF), a key part of the YMP, has been long in development and construction is ongoing. This is a progress report on the tunneling aspects of the ESF as of January 1, 1996. For purposes of discussion in this summary, the tunneling has progressed in four general phases. The paper describes: tunneling in jointed rock under low stress; tunneling through the Bow Ridge Fault and soft rock; tunneling through the Imbricate Fault Zone; and Tunneling into the candidate repository formation

  4. Current Trends in Numerical Simulation for Parallel Engineering Environments New Directions and Work-in-Progress

    International Nuclear Information System (INIS)

    Trinitis, C; Schulz, M

    2006-01-01

    In today's world, the use of parallel programming and architectures is essential for simulating practical problems in engineering and related disciplines. Remarkable progress in CPU architecture, system scalability, and interconnect technology continues to provide new opportunities, as well as new challenges for both system architects and software developers. These trends are paralleled by progress in parallel algorithms, simulation techniques, and software integration from multiple disciplines. ParSim brings together researchers from both application disciplines and computer science and aims at fostering closer cooperation between these fields. Since its successful introduction in 2002, ParSim has established itself as an integral part of the EuroPVM/MPI conference series. In contrast to traditional conferences, emphasis is put on the presentation of up-to-date results with a short turn-around time. This offers a unique opportunity to present new aspects in this dynamic field and discuss them with a wide, interdisciplinary audience. The EuroPVM/MPI conference series, as one of the prime events in parallel computation, serves as an ideal surrounding for ParSim. This combination enables the participants to present and discuss their work within the scope of both the session and the host conference. This year, eleven papers from authors in nine countries were submitted to ParSim, and we selected five of them. They cover a wide range of different application fields including gas flow simulations, thermo-mechanical processes in nuclear waste storage, and cosmological simulations. At the same time, the selected contributions also address the computer science side of their codes and discuss different parallelization strategies, programming models and languages, as well as the use nonblocking collective operations in MPI. We are confident that this provides an attractive program and that ParSim will be an informal setting for lively discussions and for fostering new

  5. Virtual Models Linked with Physical Components in Construction

    DEFF Research Database (Denmark)

    Sørensen, Kristian Birch

    The use of virtual models supports a fundamental change in the working practice of the construction industry. It changes the primary information carrier (drawings) from simple manually created depictions of the building under construction to visually realistic digital representations that also...... engineering and business development in an iterative and user needs centred system development process. The analysis of future business perspectives presents an extensive number of new working processes that can assist in solving major challenges in the construction industry. Three of the most promising...... practices and development of new ontologies. Based on the experiences gained in this PhD project, some of the important future challenges are also to show the benefits of using modern information and communication technology to practitioners in the construction industry and to communicate this knowledge...

  6. Security of supply in liberated electricity markets - key issues and experiences in OECD countries (work in progress)

    International Nuclear Information System (INIS)

    Stridbaek, Ulrik

    2005-06-01

    Security of supply of electricity could in principle refer to any parts of the value chain from fuel input to delivery of electricity to the final costumer with the expected quality. Concerns about security of supply are usually focused on three aspects: Timely and adequate supply of the input fuel for electricity generation is a prerequisite - security of energy supply. There has to be timely and adequate infrastructure in place to transform the input fuel into electricity and transport it to the final costumer - adequacy of generation and transmission capacity. Finally, it is an operational challenge to make the electricity system work and deliver at the expected quality - secure operation of the electricity system. Security of supply becomes relevant in a policy context from concerns about market failures in any parts of the value chain or, indeed, from the perspective that policy will set the framework for markets to serve as an instrument to secure the supply. This paper discusses some of the experiences with security of supply concerns and market failures in these three basic segments of the value chain; fuel input, adequate generation and transmission capacity and secure operation of the system, with an emphasis on the role of the market to serve as an efficient instrument. In the aftermath of the large black outs of electricity systems in North America, Italy and Sweden/Denmark IEA initiated a project on 'Transmission Reliability and Power System Security in Competitive Electricity Markets'. The results of this work will be published towards the end of 2005. After a decade with liberalised electricity markets in some pioneer regions, IEA now also finds it timely to analyse some of the lessons in a forthcoming publication. Recent and ongoing IEA-work thereby covers all the main aspects of security of supply. This paper summarises the key findings and messages, with a focus on the work in progress on lessons from liberalisation

  7. Women's collective constructions of embodied practices through memory work: Cartesian dualism in memories of sweating and pain.

    Science.gov (United States)

    Gillies, Val; Harden, Angela; Johnson, Katherine; Reavey, Paula; Strange, Vicki; Willig, Carla

    2004-03-01

    The research presented in this paper uses memory work as a method to explore six women's collective constructions of two embodied practices, sweating and pain. The paper identifies limitations in the ways in which social constructionist research has theorized the relationship between discourse and materiality, and it proposes an approach to the study of embodiment which enjoins, rather than bridges, the discursive and the non-discursive. The paper presents an analysis of 25 memories of sweating and pain which suggests that Cartesian dualism is central to the women's accounts of their experiences. However, such dualism does not operate as a stable organizing principle. Rather, it offers two strategies for the performance of a split between mind and body. The paper traces the ways in which dualism can be both functional and restrictive, and explores the tensions between these two forms. The paper concludes by identifiying opportunities and limitations associated with memory work as a method for studying embodiment.

  8. Review of progress in superconducting high-beta structures

    International Nuclear Information System (INIS)

    Sundelin, R.M.

    1992-01-01

    During the past two years, there has been substantial progress in superconducting high-beta cavities in a number of areas. Understanding of the Q-disease, which occurs when a cavity is held for prolonged periods near 100 K, has advanced, and techniques for mitigating this problem have improved. Progress has been made in the use of high peak power processing to suppress field emission. Cell geometries have improved to reduce the ratio of peak surface electric field to accelerating field, and trapped mode behavior has been found to permit use of nine cells for some applications. The operating experience base for cavities installed in accelerators has increased substantially, as has the performance experience base for industrially manufactured cavities, including both solid niobium and sputter-coated copper. Additional applications for superconducting cavities have been identified. Progress has been made toward the design and construction of a Tera-Electron-Volt Superconducting Linear Accelerator (TESLA) test bed. (author). 25 refs., 1 fig

  9. [Muskuloskeletal disorders in construction industry: hospital cases].

    Science.gov (United States)

    Santini, M; Riva, M M; Mosconi, G

    2012-01-01

    The authors analyse 493 hospital cases in 356 workers from the construction industry, came to observation for musculoskeletal disorders (average age 48, 2 years, SD 9; work seniority 32, 2 years, SD 9, 7; work seniority in construction industry 27, 3 years, SD 12, 4). The evaluation was required in 305 subjects (85.7% of the sample) to investigate one or more suspected WMDS; in 51 subjects (14.3% of the sample) to express an opinion on fitness to work or residual work capacity. Investigations led to diagnosis of 479 musculoskeletal disorders; the districts most affected are spine and upper limb. 64.7% of the musculoskeletal disorders was evaluated to be work-related, the percentage rises to 68% when considering only cases sent for evaluation of suspected WMDS. The most frequent reasons to exclude relation between the musculoskeletal disorders and work were an high age at diagnosis, presence of comorbidity or outcome of trauma, a disease mismatch exposure.

  10. Experience in constructing a spent nuclear fuel reprocessing plant in Japan

    International Nuclear Information System (INIS)

    Hashimoto, K.; Sakuma, A.; Inoue, K.

    1977-01-01

    Towards the end of 1970, Japan Gasoline Co. Ltd. (JGC) and Saint-Gobain Techniques Nouvelles of France received an order for the construction of a reprocessing plant from Power Reactor and Nuclear Fuel Development Corporation, as a joint prime contractor. The work executed by JGC in this project is reported and consisted of: (1) Procurement, inspection and schedule control of equipment and materials other than those imported from Europe; (2) Conclusion of contracts with various subcontractors relating to the building construction, piping and other work; and (3) Supervision of field work. The field work began in June 1971 and was completed in about 40 months. The overall field labour mobilized during that time totalled about 410,000 man-days, and 900,000 man-hours were spent by the JGC engineers. With the object of constructing a high-quality plant, JGC since 1969 has started to investigate subcontractors in Japan as well as undertaking the selection, education and training of prospective subcontractors. For the welding work in particular, techniques were imported from France and domestic techniques were developed at the same time. Completion of the blank tests was estimated to require 33 months, but the schedule was delayed about seven months for various reasons. Obviously there is room for many improvements when constructing future nuclear chemical plants. However, careful consideration should also be given from the basic design stage onward, to the methods and sequence of construction so that a simplified plan can be obtained from which the work could be easily executed without resorting to special technology. This would lead to reduction in construction time, and a safer and more reliable plant at lower cost. (author)

  11. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    Science.gov (United States)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  12. Mortality of a cohort of road construction and maintenance workers with work disability compensation.

    Science.gov (United States)

    d'Errico, A; Mamo, C; Tomaino, A; Dalmasso, M; Demaria, M; Costa, G

    2002-01-01

    Surveillance systems of occupational mortality are useful tools to identify cases of diseases suspected as occupational and to monitor their occurrence over time, in space and in population subgroups. Many surveillance systems make use of administrative data in which information about occupations and/or economic sectors of the subjects enrolled is reported, such as death certificates, hospital discharge data, census data, tax and pension records, and workers' compensation archives. In the present study we analyzed the mortality of a cohort of road construction and maintenance workers enrolled through the Italian national archive of work disability compensations, also in order to evaluate the possible use of this administrative source to monitor occupational mortality. 8,000 subjects (7,879 males) receiving a disability compensation while working in the "road construction and maintenance" sector were identified from INAIL (National Institute for Insurance of Accidents at Work) archives. Vital status of these subjects was ascertained using the information available in INAIL archives and in the national tax register. For those found to be deceased from INAIL or tax archives, or without any information on vital status, a mail follow-up was started. We considered as observation period the years from 1980 to 1993. A record linkage with the ISTAT (Italian Institute of Statistics) national mortality registry was performed and the cause of death was retrieved for 964 out of 1,259 subjects. The analysis was restricted to males, leaving altogether 863 observed deaths with ascertained cause (84.7% of 1,019 total male deaths). SMR for overall mortality and PMR for specific cause mortality were computed, using the general Italian male population as reference. Overall mortality was significantly reduced (SMR = 79.0; 95% CI = 74.2-84.0). Proportional mortality analysis revealed significant excess risks for all malignant tumours (332 deaths, PMR = 1.08) and for digestive diseases

  13. Skin Problems in Construction

    Science.gov (United States)

    ... you work with… Wet cement or plaster Abrasive cleaners Paints Adhesives Chemical solvents These materials can contain ... health hazards construction workers face on the job. Production of this card was supported by Grant OH009762 ...

  14. Site characterization progress report: Yucca Mountain, Nevada. Progress report number 17, April 1, 1997--September 30, 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-04-01

    The US Department of Energy`s (DOE) Office of Civilian Radioactive Waste Management (OCRWM), created with the enactment of the Nuclear Waste Policy Act of 1982 (NWPA), is tasked to accept and dispose of the nation`s high-level radioactive waste and spent nuclear fuel in a deep geologic repository (high-level radioactive waste program). The report summarizes significant site characterization activities during the period from April 1, 1997 through September 30, 1997, in the evaluation of Yucca Mountain as a potential site for the geologic disposal of spent nuclear fuel and high-level radioactive wastes. The progress report also cites technical reports and research products that provide the detailed information on these activities. Chapter 2 outlines technical and regulatory issues that must be addressed by the Project and planned work toward achieving future objectives concerning the viability assessment, the environmental impact statement, the site recommendation, and the license application. Chapter 3 describes technical progress in preclosure radiological safety analysis, postclosure performance assessment, and performance confirmation activities. Chapter 4 describes various aspects of repository and waste package design and construction. It also discusses the Exploration Studies Facility cross drift. Chapter 5 describes site characterization activities, and Chapter 6 contains a complete list of references.

  15. Site characterization progress report: Yucca Mountain, Nevada. Progress report number 17, April 1, 1997 - September 30, 1997

    International Nuclear Information System (INIS)

    1998-04-01

    The US Department of Energy's (DOE) Office of Civilian Radioactive Waste Management (OCRWM), created with the enactment of the Nuclear Waste Policy Act of 1982 (NWPA), is tasked to accept and dispose of the nation's high-level radioactive waste and spent nuclear fuel in a deep geologic repository (high-level radioactive waste program). The report summarizes significant site characterization activities during the period from April 1, 1997 through September 30, 1997, in the evaluation of Yucca Mountain as a potential site for the geologic disposal of spent nuclear fuel and high-level radioactive wastes. The progress report also cites technical reports and research products that provide the detailed information on these activities. Chapter 2 outlines technical and regulatory issues that must be addressed by the Project and planned work toward achieving future objectives concerning the viability assessment, the environmental impact statement, the site recommendation, and the license application. Chapter 3 describes technical progress in preclosure radiological safety analysis, postclosure performance assessment, and performance confirmation activities. Chapter 4 describes various aspects of repository and waste package design and construction. It also discusses the Exploration Studies Facility cross drift. Chapter 5 describes site characterization activities, and Chapter 6 contains a complete list of references

  16. Understanding the Links between Work Commitment Constructs.

    Science.gov (United States)

    Hackett, Rick D.; Lapierre, Laurent M.; Hausdorf, Peter A.

    2001-01-01

    In a study of 852 nurses, work involvement (value of work in their lives) affected organizational and occupational commitment through its effect on job involvement. Job involvement indirectly affected intention to leave the organization or occupation. Work and job involvement and orgnanizational and occupational commitment were determined to be…

  17. BUDGET NORMALIZATION AND PRICING FEATURES IN CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    M. I. Gadzhieva

    2016-01-01

    Full Text Available It is proved that the pricing of the construction is different from the pricing system in the industry and other branches of economy, because it has different methodological and organizational approaches. It has been determined that the cost of construction is set on the stage of its design, in the process of concluding investment contracts (construction contracts, as well as directly during construction, major repairs of objects of capital construction, reconstruction and the implementation of certain types of construction and installation works. It has been found that the pricing mechanism in construction is based on the detailed legal and reference documents regulating material consumption rates and prices, taking into account sectoral, territorial and seasonal features of building production. It has been found that under inflation conditions the price index calculation of construction products for investment purposes is of great importance. Mandatory approval of all stakeholders of the construction production method for determining the price of the construction site is proposed.

  18. Quality assurance of construction work on Dukovany nuclear power plant site

    International Nuclear Information System (INIS)

    Lachs, W.

    1983-01-01

    In order to eliminate the effects of the shrinking of concrete of the 150x70 m 2 bed slab 1 m thick, the slab was divided into 36 segments. The side walls were made of steel wire netting and the segments were concreted using the chessboard method. The second concreting was made only after the volume changes in the first concrete layer terminated. The density of the concrete of the shielding was controlled using routine methods as well as a radiometric densimeter which may be used on the building site, the technological procedure was checked by ultrasound, the surface of the concrete structures designed for epoxy coatings must be even and of uniform grain size. Volume moisture of the bed slab must be less than 4% and temperature lower than 10 degC. All deliveries, assembly and construction work must have a certificate of quality awarded after thorough tests and verification. (E.S.)

  19. Logistic Regression in the Identification of Hazards in Construction

    Science.gov (United States)

    Drozd, Wojciech

    2017-10-01

    The construction site and its elements create circumstances that are conducive to the formation of risks to safety during the execution of works. Analysis indicates the critical importance of these factors in the set of characteristics that describe the causes of accidents in the construction industry. This article attempts to analyse the characteristics related to the construction site, in order to indicate their importance in defining the circumstances of accidents at work. The study includes sites inspected in 2014 - 2016 by the employees of the District Labour Inspectorate in Krakow (Poland). The analysed set of detailed (disaggregated) data includes both quantitative and qualitative characteristics. The substantive task focused on classification modelling in the identification of hazards in construction and identifying those of the analysed characteristics that are important in an accident. In terms of methodology, resource data analysis using statistical classifiers, in the form of logistic regression, was the method used.

  20. Management of construction safety at RR site

    International Nuclear Information System (INIS)

    Pathak, B.C.; Khatsuriya, J.R.

    2016-01-01

    Construction industries are one of the most hazardous industries and hence, promotion of safety remains one of the greatest challenges facing construction industry today. According to ILO estimates: Each year at least 60,000 fatal accidents occur on construction sites around the world or one fatal accident every ten minutes. One in six fatal accidents at work occurs on a construction site. In industrialized countries, as many as 25-40 per cent of work related deaths occur on construction sites, even though the sector employs only 6-10 per cent of the workforce. The number of fatalities occurring from construction work in India is also quite disturbing. Though, the fall of person from height and through openings were the major causes for fatal /serious accidents, the risk of fatal accident involving material handling equipment, either during handling or its maintenance is also significantly high due to use of large number of material handling equipments during construction work. (author)

  1. Construct validity of the Capacity Profile in adolescents with cerebral palsy

    NARCIS (Netherlands)

    Meester-Delver, Anke; Beelen, Anita; Eck, Mirjam van; Voorman, Janine; Dallmeijer, Annet; Nollet, Frans; Becher, Jules

    2010-01-01

    Objective: To establish construct validity of the Capacity Profile, a method to comprehensively classify additional care needs in five domains of body functions (physical health, motor, sensory, mental, voice and speech functions), in adolescents with non-progressive, permanent conditions such as

  2. Dam's design continues throughout construction

    Energy Technology Data Exchange (ETDEWEB)

    Lara E, R; Wulff, J G

    1979-11-01

    In spite of adverse site conditions, Arenal dam in Costa Rica was completed a year ahead of schedule. Historical data on local earthquake activity which was available in unusual detail reduced some uncertainties in design information. Other uncertainties regarding the complex foundation conditions were resolved as excavation and construction progressed.

  3. [Manual lifting and manual transport: risk assessment and prevalence of work-related diseases in construction companies in Basilicata].

    Science.gov (United States)

    Nicoletti, S; Battevi, N; Colafemmina, G; Di Leone, G; Satriani, G; Ragone, P; Occhipinti, E

    2013-01-01

    The Basilicata Regional Headquarters of the Italian Institute for Insurance against Occupational Accidents and Disease (INAIL) and the Basilicata association of small building enterprises (Edilcassa di Basilicata) promoted a research project to assess the risk of manual lifting and manual transport in construction enterprises in the Basilicata Region and estimate the prevalence of related diseases. Manual lifting risk assessment was performed by calculating the VLI of 204 working days in as many building workers. Manual transport risk assessment was carried out comparing the weights transported (on the 204 days tested) with the reference values of the "Snoock and Ciriello" tables. Manual Ifting risk was present on 195 of the 204 days, with an average value of VLI equal to 2.1 (min 0.4, max 8.5), with higher values in the restructuring sector (VLI average of 2.3, min 0.4, max 8.5), and no significant differences between the different tasks. Manual transport risk was present on 129 of the 204 days, with average values of 1.2 (min 0.2, max 3.3), with no significant differences between the different tasks analyzed For both risks additional factors were present that were not analyzed by the methods of assessment used (for manual lifting: 8.8% of the geometries in the critical area; for manual transport: 39% of transport on shoulders, 42.5% on a route with uneven surface and 31.9% on a sloping route), so it is likely that the actual risk is greater than that indicated by the synthetic indices of exposure. The medical questionnaire showed from the case histories that 148 out of 546 subjects were positive for the threshold forpain or discomfort in the lumbosacral spine area and 99 out of 546 subjects reported suffering from an already diagnosed herniated spinal disk. Only 18% of osteoarticular diseases was reported to the Insurance Institute, al though there was widespread awareness that the diseases in question might be related to work. Diseases of the spine were

  4. Progress in Development of Kharkov X-Ray Generator Nestor

    CERN Document Server

    Androsov, V; Botman, J I M; Bulyak, V; Dovbnya, A; Drebot, I; Gladkikh, P; Grevtsev, V; Grigorev, Yu; Gvozd, A; Ivashchenko, V; Karnaukhov, I; Kovalyova, N; Kozin, V; Lapshin, V; Lebedev, A; Lyashchenko, V; Markov, V; Mocheshnikov, N; Molodkin, V; Mytsykov, A; Neklyudov, I; Peev, F; Rezaev, A; Shcherbakov, A; Shpak, A; Skirda, V; Skomorovsky, V I; Tatchyn, R; Telegin, Yu P; Trotsenko, V; Zelinsky, A; Zvonarova, O

    2005-01-01

    The sources of the X-rays based on Compton scattering of intense Nd:YAG laser beam on electron beam circulating in a storage ring with beam energy 43 - 225 MeV is under construction in NSC KIPT. In the paper the progress in development and construction of Kharkov X-ray generator NESTOR is presented. The current status of the main facility system design and development are described. New scheme and main parameters of injection system are presented. The facility is going to be in operation in the middle of 2007 and generated X-rays flux is expected to be of about 10(13) phot/s.

  5. Research in radiobiology. Annual report of work in progress in the internal irradiation program

    International Nuclear Information System (INIS)

    Miller, S.C.

    1983-01-01

    Research progress on studies of the effects of internally deposited radionuclides in dogs, mice, and humans is reported. The studies include toxicity of plutonium 239, radium 226, and radium 224, the kinetics of actinides in beagles, and dosimetry of internal emitters

  6. Quality in Construction- A Supply Chain Perspective

    DEFF Research Database (Denmark)

    Koch, Christian; Larsen, Casper Schultz

    2006-01-01

    be demonstrated by studying the emergence of failures occurring in the supply chain. The paper conceptualises the construction supply as a delivery network being partially stable, partially project specific and configured. It moreover develops a frame of understanding of the handling of quality issues...... in the delivery network, using operation management approaches. The paper presents case study work done in Danish construction. The method was observation of work at the construction site followed by interviews with actors backwards upstream the supply chain to the origin of the failure. The building project...... into the material stream. The paper proposes initiatives to strengthen partnerships in supply chains, especially at mixed stable and project configured types. The contradiction between permanent enterprise organisations potentially capable of handling purchasing and the role of the project manager is discussed...

  7. Use of formwork systems in high-rise construction

    Science.gov (United States)

    Kurakova, Oksana

    2018-03-01

    Erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization. The main material used in high-rise construction is insitu reinforced concrete. The technology of its use is directly related to the use of formwork systems. Formwork systems and formwork technologies basically determine the speed of construction and labor intensity of concreting operations. Therefore, it is also possible to achieve the goal of reducing the construction time and labor intensity of works performed by improving the technology of formwork systems use. Currently there are unresolved issues in the area of implementation of monolithic technology projects, and problems related to the selection of a formwork technology, high labor intensity of works, poor quality of materials and structures, etc. are the main ones. The article presents organizational and technological measures, by means of which introduction it is possible to shorten the duration of construction. A comparison of operations performed during formwork installation according to the conventional technology and taking into account the implemented organizational and technological measures is presented. The results of a comparative analysis of economic efficiency assessments are also presented on the example of a specific construction project before and after the implementation of the above mentioned measures. The study showed that introduction of the proposed organizational and technological model taking into account optimization of reinforcing and concreting works significantly improves the efficiency of a high-rise construction project. And further improvement of technologies for the use of insitu reinforced concrete is a promising direction in the construction of high-rise buildings.

  8. Use of formwork systems in high-rise construction

    Directory of Open Access Journals (Sweden)

    Kurakova Oksana

    2018-01-01

    Full Text Available Erection of high quality buildings and structures within a reasonable time frame is the crucial factor for the competitiveness of any construction organization. The main material used in high-rise construction is insitu reinforced concrete. The technology of its use is directly related to the use of formwork systems. Formwork systems and formwork technologies basically determine the speed of construction and labor intensity of concreting operations. Therefore, it is also possible to achieve the goal of reducing the construction time and labor intensity of works performed by improving the technology of formwork systems use. Currently there are unresolved issues in the area of implementation of monolithic technology projects, and problems related to the selection of a formwork technology, high labor intensity of works, poor quality of materials and structures, etc. are the main ones. The article presents organizational and technological measures, by means of which introduction it is possible to shorten the duration of construction. A comparison of operations performed during formwork installation according to the conventional technology and taking into account the implemented organizational and technological measures is presented. The results of a comparative analysis of economic efficiency assessments are also presented on the example of a specific construction project before and after the implementation of the above mentioned measures. The study showed that introduction of the proposed organizational and technological model taking into account optimization of reinforcing and concreting works significantly improves the efficiency of a high-rise construction project. And further improvement of technologies for the use of insitu reinforced concrete is a promising direction in the construction of high-rise buildings.

  9. A multi-agent safety response model in the construction industry.

    Science.gov (United States)

    Meliá, José L

    2015-01-01

    The construction industry is one of the sectors with the highest accident rates and the most serious accidents. A multi-agent safety response approach allows a useful diagnostic tool in order to understand factors affecting risk and accidents. The special features of the construction sector can influence the relationships among safety responses along the model of safety influences. The purpose of this paper is to test a model explaining risk and work-related accidents in the construction industry as a result of the safety responses of the organization, the supervisors, the co-workers and the worker. 374 construction employees belonging to 64 small Spanish construction companies working for two main companies participated in the study. Safety responses were measured using a 45-item Likert-type questionnaire. The structure of the measure was analyzed using factor analysis and the model of effects was tested using a structural equation model. Factor analysis clearly identifies the multi-agent safety dimensions hypothesized. The proposed safety response model of work-related accidents, involving construction specific results, showed a good fit. The multi-agent safety response approach to safety climate is a useful framework for the assessment of organizational and behavioral risks in construction.

  10. The BGO collaboration progress report 1990

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    A large solid angle BGO calorimeter is under contruction for photo-nuclear experiments at intermediate energy facilities. In this note the status progress of the project, the technical steps undertaken in the construction of the apparatus and the goals of this initiative are reviewed

  11. Construction of meaningful identities in the context of rheumatoid arthritis, motherhood and paid work: A meta-ethnography.

    Science.gov (United States)

    Feddersen, Helle; Kristiansen, Tine Mechlenborg; Andersen, Pernille Tanggaard; Hørslev-Petersen, Kim; Primdahl, Jette

    2017-12-01

    To derive new conceptual understanding about how women with rheumatoid arthritis manage their illness, motherhood and paid work, based on a comprehensive overview of existing knowledge, gained from qualitative studies. Rheumatoid arthritis affects several social aspects of life; however, little is known about how women with rheumatoid arthritis simultaneously manage their illness, motherhood and paid work. Qualitative metasynthesis. A qualitative metasynthesis informed by Noblit and Hare's meta-ethnography was carried out, based on studies identified by a systematic search in nine databases. Six studies were included. Social interactions in the performance of three interdependent subidentities emerged as an overarching category, with three subcategories: subidentities associated with (1) paid work, (2) motherhood and (3) rheumatoid arthritis. Pressure in managing one of the subidentities could restrict the fulfilment of the others. The subidentities were interpreted as being flexible, situational, contextual and competing. The women strove to construct meaningful subidentities by taking into account feedback obtained in social interactions. The subidentities associated with paid work and motherhood are competing subidentities. Paid work is given the highest priority, followed by motherhood and illness is the least attractive subidentity. Because of the fluctuating nature of the illness, the women constantly reconstruct the three interdependent subidentities. When healthcare professionals meet a woman with rheumatoid arthritis, they should consider that she might not accept the subidentity as an ill person. Health professionals should not expect that women will prioritise their illness in their everyday life. This could be included in clinical conversation with the women. © 2017 John Wiley & Sons Ltd.

  12. Progress report 1979

    International Nuclear Information System (INIS)

    1980-12-01

    This progress report deals with technical and research work done at the AAEC Research Establishment in the twelve month period ending September 30, 1979. Work done in the following research divisions is reported: Applied Maths and Computing, Chemical Technology, Engineering Research, Environmental Science, Instrumentation and Control, Isotope, Materials and Physics

  13. Critical analysis of procurement techniques in construction management sectors

    Science.gov (United States)

    Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad

    2018-04-01

    Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.

  14. Karlsruhe Nuclear Research Center, Institute of Nuclear Solid State Physics. Progress report on research and development work in 1993

    International Nuclear Information System (INIS)

    1994-03-01

    The Institute for Nuclear Solids Physics carried out about 90% of its work in the year of the report, 1993, on the main point of superconductivity. The work on high temperature superconductors on a cuprate basis was continued on a large scale. The availability of better samples (eg: non-twinned single crystals) make it possible to clear up a series of important detailed questions regarding the structure, grid dynamics and electronic structure. The activities closely related to applications of superconducting films were concentrated on the growth of a-axis and c-axis orientated films on technically relevant substrates (above all on sapphire, including suitable buffer layers and the examination of these films regarding their high frequency behaviour. Considerable progress was achieved in the manufacture of wafers coated on both sides. The work on Fullerene (carbon molecules C 60 , C 70 etc) and Fullerene compounds was continued. The Institute quickly succeeded not only in preparing these systems, but also in making a considerable contribution to a physical understanding of them. Among the Institute's activities, which are not directly connected to superconductivity (about 10%), one should mention above all, the experimental and theoretical work on the physics of surfaces and boundary surfaces, on polymer physics and on the physics of mesoscopic systems. (orig.) [de

  15. Characteristics of worker accidents on NYSDOT construction projects.

    Science.gov (United States)

    Mohan, Satish; Zech, Wesley C

    2005-01-01

    This paper aims at providing cost-effective safety measures to protect construction workers in highway work zones, based on real data. Two types of accidents that occur in work zones were: (a) construction work area accidents, and (b) traffic accidents involving construction worker(s). A detailed analysis of work zone accidents involving 36 fatalities and 3,055 severe injuries to construction workers on New York State Department of Transportation (NYSDOT) construction projects from 1990 to 2001 established that five accident types: (a) Struck/Pinned by Large Equipment, (b) Trip or Fall (elevated), (c) Contact w/Electrical or Gas Utility, (d) Struck-by Moving/Falling Load, and (e) Crane/Lift Device Failure accounted for nearly 96% of the fatal accidents, nearly 63% of the hospital-level injury accidents, and nearly 91% of the total costs. These construction work area accidents had a total cost of $133.8 million. Traffic accidents that involve contractors' employees were also examined. Statistical analyses of the traffic accidents established that five traffic accident types: (a) Work Space Intrusion, (b) Worker Struck-by Vehicle Inside Work Space, (c) Flagger Struck-by Vehicle, (d) Worker Struck-by Vehicle Entering/Exiting Work Space, and (e) Construction Equipment Struck-by Vehicle Inside Work Space accounted for nearly 86% of the fatal, nearly 70% of the hospital-level injury and minor injury traffic accidents, and $45.4 million (79.4%) of the total traffic accident costs. The results of this paper provide real statistics on construction worker related accidents reported on construction work zones. Potential preventions based on real statistics have also been suggested. The ranking of accident types, both within the work area as well as in traffic, will guide the heavy highway contractor and owner agencies in identifying the most cost effective safety preventions.

  16. Comment: Risk Allocation Norms of Civil Construction Contracts in ...

    African Journals Online (AJOL)

    This comment discusses risk allocation under Ethiopian construction law and examines risks in civil construction contracts. The comment highlights the gaps in risk allocation norms under the standard format of construction contract that was issued by the Ethiopian Ministry of Work and Urban Development (MoWUD) in 1994 ...

  17. Advances in power station construction

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    This book is about power stations - specifically about the construction of modern power stations by the Central Electricity Generating Board in England and Wales over the past decade. It describes the work of the CEGB's Generation Development and Construction Division, perhaps better known throughout the world as simply 'Barnwood' where it has its Headquarters in Gloucester, UK. Barnwood was formed in the early 1970s to concentrate the CEGB's then dispersed engineering construction resources to cope with the smaller number but greatly increased size and complexity of modern power station projects. Perhaps uniquely over the ten years since its formation Barnwood has managed the construction of all types of station; coal-fired, oil-fired, nuclear, pumped storage and hydro. This book tells the story of these various projects and gives detailed descriptions of the respective stations. However, it is not intended as a comprehensive description of power station technology. Rather it is intended to convey the scale of such projects and the many decisions and compromises which have to be made in the course of managing their construction

  18. Construction over abandoned mine workings

    Energy Technology Data Exchange (ETDEWEB)

    Healy, P R; Head, J M

    1984-01-01

    Guidance is given for engineers involved with the planning and development of sites previously undermined for coal and other minerals. Past methods of mining employed in Britain are described, and their short- and long-term effects on surface stability are assessed. Where modern methods of mining are relevant, or where structural design techniques for the surface effects of mining can be applied, these are included for illustration and completeness. Additional objectives over and above those for conventional site investigations are identified, and details are provided for the planning and execution of a mining investigation. Techniques for consolidation of old mine workings and remedial measures for mine shafts are described. Foundation design options are included for cases where expected ground movements can be accommodated. A comprehensive guide to sources of information on previous mining is presented, together with an example of a specification suitable for the consolidation of old shallow mine workings. (50 refs.)

  19. Risk management in public sector construction projects: Case ...

    African Journals Online (AJOL)

    a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.

  20. Ross Works on the Assembly Concept for Construction of Erectable Space Structure (ACCESS) During

    Science.gov (United States)

    1985-01-01

    The crew assigned to the STS-61B mission included Bryan D. O'Conner, pilot; Brewster H. Shaw, commander; Charles D. Walker, payload specialist; mission specialists Jerry L. Ross, Mary L. Cleave, and Sherwood C. Spring; and Rodolpho Neri Vela, payload specialist. Launched aboard the Space Shuttle Atlantis November 28, 1985 at 7:29:00 pm (EST), the STS-61B mission's primary payload included three communications satellites: MORELOS-B (Mexico); AUSSAT-2 (Australia); and SATCOM KU-2 (RCA Americom). Two experiments were conducted to test assembling erectable structures in space: EASE (Experimental Assembly of Structures in Extravehicular Activity), and ACCESS (Assembly Concept for Construction of Erectable Space Structure). In a joint venture between NASA/Langley Research Center in Hampton, Virginia, and the Marshall Space Flight Center (MSFC), EASE and ACCESS were developed and demonstrated at MSFC's Neutral Buoyancy Simulator (NBS). In this STS-61B onboard photo, astronaut Ross works on ACCESS high above the orbiter. The primary objective of these experiments was to test the structural assembly concepts for suitability as the framework for larger space structures and to identify ways to improve the productivity of space construction.