WorldWideScience

Sample records for construction permits

  1. 10 CFR 50.23 - Construction permits.

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Construction permits. 50.23 Section 50.23 Energy NUCLEAR... Description of Licenses § 50.23 Construction permits. A construction permit for the construction of a... part 52 of this chapter, the construction permit and operating license are deemed to be combined in a...

  2. Storm Water General Permit 2 for Construction

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #2 for storm water discharges associated with industrial activity for Construction Activities in Iowa for the National Pollutant Discharge Elimination...

  3. Action for declaration of annulment of reactor construction permit dismissed

    International Nuclear Information System (INIS)

    Anon.

    1982-01-01

    The Higher Administrative Court of Rheinland Pfalz has confirmed two decisions by the Koblenz Administrative Court dismissing an actions to declare the annulment of the partial construction permit issued for the Muelheim-Kaerlich reactor. Appeal was not admitted. The plaintiffs, who are under age and were represented by their father, are permanently resident in Schleswig-Holstein, at about 470 km from the site and have a further residence in Mainz, about 60 km away from the site. They plead to have a legitimate interest in the declaration of nullity on the grounds of the uncertainty created in legal matters by the delivery of the permit and its being unconstitutional as well as for ideological and religious reasons. The ruling deals also with the importance of the distance from the site of a nuclear reactor, which is considered to be such as to exclude the 'necessary spatial relation'. (orig./HP) [de

  4. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  5. 10 CFR 50.55 - Conditions of construction permits, early site permits, combined licenses, and manufacturing...

    Science.gov (United States)

    2010-01-01

    ... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...

  6. Construction permit of nuclear power plants in case of leasing

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Guiding lines (unofficial): 1. A leasing company can be founded to finance and to operate a nuclear power plant. 2. The leasing company does not require a license according to section 7 of the Atomic Energy Act, for it neither constructs nor posesses the nuclear power plant. 3. This also applies if the proprietor, and later on operator, of the nuclear power plant holds an interest in this leasing company as a shareholder. Section 7, and 19 subsection 3 of the Atomic Energy Act. Higher Administrative Court of Rhineland Palatinate, Decision of July 20sup(th), 1982. (orig.) [de

  7. 25 CFR 163.30 - Revocable road use and construction permits for removal of commercial forest products.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Revocable road use and construction permits for removal... Revocable road use and construction permits for removal of commercial forest products. (a) In accordance... revocable road use and construction permits to users for the purpose of removing forest products. (b) When a...

  8. Binding and preclusive effect of part-construction permits and preliminary licenses

    International Nuclear Information System (INIS)

    Jarass, H.D.

    1983-01-01

    This contribution discusses the binding and preclusive effect of part-construction permits and preliminary licenses granted in accordance with the laws on air pollution abatement and the Atomic Energy Act. The author states that the granting of a part-construction permit must be based on a final decision over the entire project and must include a preliminary judgement and evaluation of the entire project, also covering site selection and design concept approval. The binding effort and preclusive effect of part-permits are examined in great detail, namely their definition, basic principles, extent, coming into force and term of validity and, (for the preclusive effect), its prerequisites, consequences, considerations regarding immediate execution). The author concludes by stating that there is no difference in regard to binding or preclusive effect between part-construction permits and a preliminary licence. (HP) [de

  9. 7 CFR 1724.52 - Permitted deviations from RUS construction standards.

    Science.gov (United States)

    2010-01-01

    ... neutrals to provide the required electric service to a consumer, the RUS standard transformer secondary... UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES Electric System Design § 1724.52 Permitted deviations from RUS construction...

  10. Financial qualifications review of applicants for nuclear power plant construction permits

    International Nuclear Information System (INIS)

    Hendrickson, P.L.; Mullen, M.F.; Carr, D.B.

    1988-09-01

    The NRC and its predecessor the AEC have had a regulatory requirement since 1956 that utilities seeking a construction permit for a nuclear power plant be financially qualified to construct and operate the plant. Several amendments to the requirements were made over the years including an attempt in 1982 to drop financial qualification review for electric utilities. This attempt was subsequently found invalid by a federal court. Nevertheless, financial qualification reviews consume significant amounts of NRC staff time and time at Atomic Safety and Licensing Board hearings. The analysis reported in this study was conducted to determine whether there is any empirical evidence of a relationship between a utility's financial health at the time of its construction permits application and the subsequent safety performance of the operating plant. The principal financial measures used to test for this relationship were bond rating, interest coverage ratio, debt/asset ratio, debt/equity ratio, and rate of return on equity. The principal safety measure was the long-term average of the scores assigned the utility in four key areas by the NRC under the Systematic Assessment of Licensee Performance program. The results of the analysis showed no evidence of a relationship between financial health at the time of the construction permit and subsequent safety performance. 7 refs., 16 figs., 4 tabs

  11. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    International Nuclear Information System (INIS)

    1995-11-01

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology

  12. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology.

  13. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  14. Environmental standard review plans for the environmental review of construction permit applications for nuclear power plants

    International Nuclear Information System (INIS)

    1979-05-01

    Information is presented concerning environmental descriptions; plant description; environmental impacts of construction; environmental impacts of station operation; environmental measurements and monitoring programs; environmental impacts of postulated accidents involving radioactive materials; the need for the plant; alternatives to the project; and evaluation of the proposed action

  15. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  16. Y-12 Construction/Demolition Landfill VII: Permit application: Part 1 and 2

    International Nuclear Information System (INIS)

    1992-04-01

    The United States Department of Energy (DOE) has three major operating facilities on the DOE Oak Ridge Reservation (ORR) at Oak Ridge, Tennessee: the Y-12 Plant, the K-25 Site, and the Oak Ridge National Laboratory (ORNL). Operations associated with the DOE energy research and production facilities at Oak Ridge result in the production of several types of waste materials. Disposal of solid waste (as defined in the Solid Waste Processing and Disposal Rules for Tennessee) in disposal facilities operated by the Y-12 Plant is the responsibility of Y-12 Waste Management Division (MWD). The WMD is proposing to develop a facility that will include two new disposal units: one for construction/demolition waste and spoil and one for industrial solid waste. This manual describes the closure and post-closure plans for the construction/demolition waste and spoil disposal unit. This disposal unit is referred to as the Y-12 Construction/Demolition Landfill VII (CD-VII) and is to be operated by the Y-12 Plant for the DOE. This will be a Tennessee Department of Environment and Conservation/Division of Solid Waste Management (TDEC/DSWM) Class IV disposal unit

  17. Design, permitting, and construction issues associated with closure of the Panna Maria uranium tailings impoundment

    International Nuclear Information System (INIS)

    Strachan, C.L.; Raabe, K.L.

    1997-01-01

    In 1992, Panna Maria Uranium Operations (PMUO) initiated licensing and engineering activities for closure of the Panna Maria mill and 150-acre tailings impoundment located in southeast Texas. Closure of the tailings impoundment is permitted by license amendment through the Texas Natural Resources Conservation Commission (TNRCC), and based on closure criteria outlined in Texas regulations. The closure plan for the Panna Maria tailings impoundment was submitted for Texas regulatory agency review in April 1993, with details of the closure plan modified in 1994, 1995, and 1996. The closure plan included a multi-layered cover over the regraded tailings surface which was designed for long-term isolation of tailings, reduction of radon emanation to regulated levels, and reduction of infiltration to TNRCC-accepted levels. The cover and embankment slope surfaces and surrounding areas were designed to provide acceptable erosional stability as compared to runoff velocities from the Probable Maximum Precipitation event. Cover materials were selected from on-site materials and evaluated for suitability based on permeability, radon attenuation, and soil dispersivity characteristics. Off-site materials were used when necessary. The cover over the tailings has a maximum slope of 0.5 percent, and the regraded embankment slopes outside the perimeter of the impoundment have a maximum slope of 20 percent. All reclaimed slopes are covered with topsoil and revegetated. A riprap-lined channel is to be used to convey runoff from within the perimeter of the reclaimed impoundment to the north of the impoundment

  18. Safety Evaluation Report related to the construction permit and operating license for the research reactor at the University of Texas (Docket No. 50-602)

    International Nuclear Information System (INIS)

    1985-05-01

    This Safety Evaluation Report for the application filed by the University of Texas for a construction permit and operating license to construct and operate a TRIGA research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the University of Texas and is located at the university's Balcones Research Center, about 7 miles (11.6 km) north of the main campus in Austin, Texas. The staff concludes that the TRIGA reactor facility can be constructed and operated by the University of Texas without endangering the health and safety of the public

  19. Possibilities for improved practice, decision support for permit applications of ash utilization in constructions; Laett att goera raett, beslutsunderlag foer miljoeproevning av askor i anlaeggningar

    Energy Technology Data Exchange (ETDEWEB)

    Toller, Susanna; Johansson, Mats; Wik, Ola; Erlandsson, Aasa; Lundberg, Kristina

    2011-02-15

    Combustion of solid biofuels, peat and different types of waste in Sweden for the purpose of energy production generates approximately 1.3 million tonnes of residues yearly. These have varying chemical and technical properties, depending on the type of fuel, the combustion process and the type of furnace. From a technical point of view, some of the ashes may be used for civil works. However, the Swedish Environmental Code requires that operators obtain a permit from the local environmental authorities if ashes are utilized for construction purposes. Previous studies on the application and permitting process have indicated that it can be improved, in particular both the information provided by the operators and the decision process. The stakeholders involved in the decision process have expressed that they have limited knowledge on expected environmental impacts from the utilization of ashes in civil works and that existing knowledge not is being fully applied in practice. The aim of this project was to improve the decision support for permit application of ash utilization in constructions. The goals were to - initiate and develop the discussion regarding which information should be used in the decision process - suggest the scope and content of the information to be supplied in the permit application - contribute to improved communication between different stakeholders - identify possibilities of using the knowledge obtained by research for decision support The stakeholders' (operators and environmental authorities) opinions and viewpoint on the assessment and application process were achieved through interviews. The results from the interviews were presented and discussed during a seminar. Both the interviews and the seminar provided information, but at the same time they served to initiate a discussion on permit application procedure and to increase the communication between different stakeholders. The outcomes from these activities (interviews and seminar

  20. Safety evaluation report related to the construction permit and operating license for the research reactor at the University of Texas (Docket No. 50-602)

    International Nuclear Information System (INIS)

    1992-01-01

    The Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC) has prepared Supplement 1 to NUREG-1135, ''Safety Evaluation Report Related to the Construction Permit and Operating License for the Research Reactor at the University of Texas'' (SER) May 1985. The reactor facility is owned by The University of Texas at Austin (UT, the applicant) and is located at the University's Balcones Research Center in Austin, Texas. This supplement to the SER (SSER) describes the changes to the reactor facility design from the description in the SER. The SER and SSER together reflect the facility as built. The SSER also documents the reviews that the NRC has completed regarding the applicant's emergency plan, security plan, and technical specifications that were identified as open in the SER

  1. Protection of third parties. The protection of third parties affected by building or plant construction permits under the public construction law, the emission control law, or the atomic energy law

    International Nuclear Information System (INIS)

    Koenig, S.

    1993-01-01

    Building construction permits just like plant construction permits under the Federal Emission Control Act or the Atomic Energy Act are typical cases representing the administrative order with a dual effect, or an effect on third parties: decisions supporting the interests of the project owner always affect third parties. Third party protection therefore is a major topic of public construction law or the environmental protection law to be applied to industrial installations. Although actions brought by third parties have become something ordinary for the administrative courts, substantive third party protection continues to pose specific problems. The book in hand develops and explains a way out of the dilemma created by third party protection. The solutions presented are founded on a sound dogmatic basis and take into account the Federal Constitutional Court's rulings in matters of civil rights. The starting point adopted by the authors is the third party rights warranting protection, with the objective protection provided for by the law in general gaining effect as subjective rights as far as the protection is based on the civil rights of the constitution. The scope of protection affordable depends on the individual case and the reconciliation of terests of all parties concerned. The problem solutions set forth very extensively rely on the jurisdiction in matters of third party protection and on approaches published in the relevant literature, so that the book also may serve as a guide to current practice and a helpful source of reference for readers looking for information about the issue of third party protection. (orig./HP) [de

  2. Air Dispersion Modeling for the INL Application for a Synthetic Minor Sitewide Air Quality Permit to Construct with a Facility Emission Cap Component

    Energy Technology Data Exchange (ETDEWEB)

    Sondrup, Andrus Jeffrey [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2015-10-01

    The Department of Energy Idaho Operations Office (DOE-ID) is applying for a synthetic minor, Sitewide, air quality permit to construct (PTC) with a facility emission cap (FEC) component from the Idaho Department of Environmental Quality (DEQ) for Idaho National Laboratory (INL) to limit its potential to emit to less than major facility limits for criteria air pollutants (CAPs) and hazardous air pollutants (HAPs) regulated under the Clean Air Act. This document is supplied as an appendix to the application, Idaho National Laboratory Application for a Synthetic Minor Sitewide Air Quality Permit to Construct with a Facility Emissions Cap Component, hereafter referred to as “permit application” (DOE-ID 2015). Air dispersion modeling was performed as part of the permit application process to demonstrate pollutant emissions from the INL will not cause a violation of any ambient air quality standards. This report documents the modeling methodology and results for the air dispersion impact analysis. All CAPs regulated under Section 109 of the Clean Air Act were modeled with the exception of lead (Pb) and ozone, which are not required to be modeled by DEQ. Modeling was not performed for toxic air pollutants (TAPs) as uncontrolled emissions did not exceed screening emission levels for carcinogenic and non-carcinogenic TAPs. Modeling for CAPs was performed with the EPA approved AERMOD dispersion modeling system (Version 14134) (EPA 2004a) and five years (2000-2004) of meteorological data. The meteorological data set was produced with the companion AERMET model (Version 14134) (EPA 2004b) using surface data from the Idaho Falls airport, and upper-air data from Boise International Airport supplied by DEQ. Onsite meteorological data from the Grid 3 Mesonet tower located near the center of the INL (north of INTEC) and supplied by the local National Oceanic and Atmospheric Administration (NOAA) office was used for surface wind directions and wind speeds. Surface data (i

  3. 2008 Contruction General Permits & Multi-Sector General Permits

    Data.gov (United States)

    U.S. Environmental Protection Agency — View stormwater notices of intent (NOIs) for construction projects under EPA's 2008 Construction General Permit (CGP), for Low Erosivity Waivers (LEWs) submitted...

  4. Ci PERMIT

    CERN Multimedia

    Relations with the Host States Service

    1999-01-01

    The Swiss Permanent Mission to the International Organisations at Geneva recalls that only the spouses and children of members of personnel resident in Switzerland and in possession of a legitimation card of types 'B', 'C', 'D' or 'E' issued by the Swiss Federal Department of Foreign Affairs are entitled to benefit from a Ci Permit.The 'demande d'attestation de permis Ci' (request for a Ci permit attestation) can be sent to the Mission only through Personnel Division (Administrative Services, Office 33/1-025).Additional information on access by family members of CERN officials to the Swiss labour market are available to you on the Web site of the Relations with the Host States Service (cf. document entitled 'Employment in Switzerland for spouses and children of CERN officials' dated March 1996).Relations with the Host States Servicehttp://www.cern.ch/relations/Tel. 72848

  5. Design, construction, establishment of proof of principle, and testing of a spectrometer to permit spectroelectrochemical investigations of actinides in a confined system

    International Nuclear Information System (INIS)

    Dasgupta, P.K.; Li, J.

    1999-02-01

    This study examines the design, construction, and performance of a spectrometer that was designed and built for UV-visible absorption spectroscopic studies in molten salt media. Contrary to previous designs in the literature, the authors found that furnace and chemical components can be located away from the instrument and electronics. In studying the performance of the spectrometer, they used a potassium chloride eutectic mixture as the molten salt medium. They found that UV-visible absorption spectroscopic studies can be conveniently created in a molten alkali halide media with inexpensive equipment coupled with good sensitivity and precision. Further research will focus on designing a suitable fiber optic probe that will allow the authors to monitor the molten salt process on-line

  6. Federal Fisheries Permit (FFP)/ Federal Processor Permit (FPP) Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Federal Fisheries Permit (FFP) is required for vessels of the United States which are used to fish for groundfish in the Gulf of Alaska or Bering Sea and...

  7. Permit.LOA table

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This table includes the effective dates by vessel and permit number for each issued letter of authorization (LOA) by the Permit Office (APSD)

  8. State Licenses & Permits

    Data.gov (United States)

    Small Business Administration — Starting a business? Confused about whether you need a business license or permit? Virtually every business needs some form of license or permit to operate legally....

  9. Tradeable carbon permits

    International Nuclear Information System (INIS)

    Koutstaal, P.R.

    1995-01-01

    The research project on tradeable carbon permits has focused on three elements. First of all, the practical implications of designing a system of tradeable emission permits for reducing CO2 has been studied. In the second part, the consequences of introducing a system of tradeable carbon permits for entry barriers have been considered. Finally, the institutional requirements and welfare effects of coordination of CO2 abatement in a second-best world have been examined

  10. Legal Review: Issuance of Separate Permits for a Nuclear Reactor for Research

    International Nuclear Information System (INIS)

    Chang, Gun-Hyun; Kim, Sang-Wwon; Koh, Jae-Dong; Kim, Chang-Bum; Ahn, Sang-kyu

    2006-01-01

    With regard to the nuclear reactor permission system under the Atomic Energy Act of the Republic of Korea, two types of permits must be obtained for nuclear power reactors under Article 11 and Article 21 of the Atomic Energy Act: construction permits and operation permits. Concerning nuclear reactors for research, however, only one permit is required: a dual permit that authorizes both construction and operation, under Article 33 of said act. This permit can be obtained by submitting an application for a dual construction and operation permit to the regulatory authority. The question is whether a dual permit can be issued for nuclear reactors for research under any circumstances. If the literal provisions of the Atomic Energy Act are applied rigorously even in cases where it is realistically difficult to submit a dual permit application or issue a dual permit for construction and operation considering the power output, usage, and design complexity of nuclear reactors for research, separate permits for construction or operation shall never be issued, with only dual permits for construction and operation issued. For the Hanaro research reactor, a dual permit was issued with a condition attached thereto based on the literal provisions of the Atomic Energy Act at the time of its construction, although an application for and issuance of a dual permit for its construction and operation were impossible at the time. This is in violation of the purport of the law that provides for a dual permit

  11. Permit to Work System in Nuclear Malaysia

    International Nuclear Information System (INIS)

    Shyen, A.K.S.; Azwafarina Zarmira Aznan; Md Derus Ibrahim

    2015-01-01

    A Permit-To-Work System is an essential part of the job risk assessment process. An effective Permit-To-Work System would help to prevent accident that usually involves maintenance and construction activities. In Malaysian Nuclear Agency, Radiation Safety and Health Division (BKS) has been given the responsibility to implement the system in order to fulfill the requirement of providing a safe and healthy workplace and environment for its employees as pledged in the Occupational Safety, Health and Environmental Policy. This paper presents the roles and functions of Permit-To-Work System, together with the process flow and challenges ahead. (author)

  12. Automatic Commercial Permit Sets

    Energy Technology Data Exchange (ETDEWEB)

    Grana, Paul [Folsom Labs, Inc., San Francisco, CA (United States)

    2017-12-21

    Final report for Folsom Labs’ Solar Permit Generator project, which has successfully completed, resulting in the development and commercialization of a software toolkit within the cloud-based HelioScope software environment that enables solar engineers to automatically generate and manage draft documents for permit submission.

  13. Discussion of the question whether a local authority can claim to be affected in its planning competence by a permit issued for construction of a radwaste processing plant. High Administrative Court Lueneburg, judgement of 21.1.1993 - 7 K 5/90

    International Nuclear Information System (INIS)

    Czajka, D.

    1993-01-01

    A local authority has taken legal action against the first partial permit for the construction of a radwaste conditioning pilot plant at Gorleben, claiming to be affected in its planning competence by the fact that transport of spent fuel elements between the spent fuel storage facility and the pilot plant 2 km away would have to proceed on the rural district road. The action has been discussed. Appealable head notes: A local authority is not affected in its planning competence by a permit issued for construction of a facility for radwaste processing, although the operation of said facility may result in radwaste being transported by a road crossing the local authority's territory. (orig.) [de

  14. Permitted Marine Hydrokinetic Projects

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — This data represents pending or issued preliminary permits or issued licenses for marine hydrokinetic projects that produce energy from waves or directly from the...

  15. BCDC Minor Permits

    Data.gov (United States)

    California Natural Resource Agency — An administrative permit can be issued for an activity that qualifies as a minor repair or improvement in a relatively short period of time and without a public...

  16. Allegheny County Asbestos Permits

    Data.gov (United States)

    Allegheny County / City of Pittsburgh / Western PA Regional Data Center — Current asbestos permit data issued by the County for commercial building demolitions and renovations as required by the EPA. This file is updated daily and can be...

  17. Floodplain District Permit

    Data.gov (United States)

    Montgomery County of Maryland — The purpose of a Floodplain District Permit (FPDP) is to control floodplain development in order to protect persons and property from danger and destruction and to...

  18. Coal Mine Permit Boundaries

    Data.gov (United States)

    Earth Data Analysis Center, University of New Mexico — ESRI ArcView shapefile depicting New Mexico coal mines permitted under the Surface Mining Control and Reclamation Act of 1977 (SMCRA), by either the NM Mining these...

  19. 40 CFR 70.5 - Permit applications.

    Science.gov (United States)

    2010-07-01

    ... establish. Where an existing part 70 permit would prohibit such construction or change in operation, the... information only if it is related to the proposed change. Information required under paragraph (c) of this... part shall state that, based on information and belief formed after reasonable inquiry, the statements...

  20. Hanford Facility RCRA permit handbook

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    Purpose of this Hanford Facility (HF) RCRA Permit Handbook is to provide, in one document, information to be used for clarification of permit conditions and guidance for implementing the HF RCRA Permit.

  1. Title V Permitting Statistics Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Title V Permitting Statistics Inventory contains measured and estimated nationwide statistical data, consisting of counts of permitted sources, types of permits...

  2. Permit application modifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils.

  3. Permit application modifications

    International Nuclear Information System (INIS)

    1995-11-01

    This document contains the Permit Application Modifications for the Y-12 Industrial Landfill V site on the Oak Ridge Reservation. These modifications include the assessment of stability of the proposed Landfill V under static and loading conditions. Analyses performed include the general slope stability, veneer stability of the bottom liner and cover system, and a liquefaction potential assessment of the foundation soils

  4. PERMITTING HAZARDOUS WASTE INCINERATORS

    Science.gov (United States)

    This publication is a compilation of information presented at a seminar series designed to address the issues that affect the issuance of hazardous waste incineration permits and to improve the overall understanding of trial burn testing. pecifically, the document provides guidan...

  5. Air permitting of IGCC plants

    Energy Technology Data Exchange (ETDEWEB)

    Chitikela, S.R.

    2007-07-01

    The IGCC process is, currently, the preferred choice over conventional thermal power production in regard to cleanup of fuel and significantly reduced contaminant emissions. The air permitting requirements include the review of: feed preparation and PM emissions; feed gasification and contaminant emissions; elemental sulfur recovery and SO{sub 2} emissions; options for carbon-dioxide recovery; syngas characteristics for combustion; CT design and combustion mechanisms; air contaminant emissions of CT; controlled CT emissions of nitrogen-oxides and carbon-monoxide gases using the SCR and oxidation catalysts, respectively; and, emission of volatile organic compounds (VOCs), and hazardous air pollutants (HAPs). However, the IGCC processes are being rigorously reviewed for the system integration and reliability, and significant reduction of air contaminant emissions (including the greenhouse gases). This paper included a review of IGCC air contaminant emission rates, and various applicable regulatory requirements, such as NSR (New Source Review), NSPS (New Source Performance Standards), and MACT (Maximum Achievable Control Technology). The IGCC facility's NOX, CO, SO{sub 2}, PM, VOCs, and HAPs emission rates would be significantly low. Thus, effective, construction and installation, and operation air permits would be necessary for IGCC facilities.

  6. Storm Water General Permit 3 for Rock and Asphalt

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #3 for storm water discharges associated with industrial activity for Asphalt Plants, Concrete Batch Plants, Rock Crushing Plants and Construction...

  7. Permitting issues in Virginia

    International Nuclear Information System (INIS)

    Kennel, R.P.

    1992-01-01

    As background, LG and E Development Corporation (formerly Hadson) has successfully put 16 Qualifying Facilities in the ground over the past 9 years in California, Maine, Virginia, and North Carolina. Each of these qualifying facilities has had some environmental innovative first, so there is no apology for the authors' environmental credentials. In Virginia, there are four identical 60 MW stoker coal cogeneration projects in Southampton County, Altavista, Hopewell, and -lastly-Buena Vista. The Buena Vista cogeneration project becomes the exception that proves the permitting rules. It has been in the permitting process for over 4 years; and despite being the cleanest coal project ever considered east of the Mississippi (design at 0.1 lbs/MMBtu for both So 2 and NO x ), it has suffered serous consequences from permitting delays and BACT ratcheting. As a simple comparison of importance, the Virginia Power Mt. Storm coal power facility emits approximately 150,000 tons of So 2 per year, while the Buena Vista project will actually emit approximately 150 tons of SO 2 per year (not including 1,500' tons of purchased SO 2 offsets). Both are similar distances from the Shenandoah National Park which has been the primary environmental point of concern in Virginia

  8. Industrial Fuel Gas Demonstration Plant Program: environmental permit compliance plan

    Energy Technology Data Exchange (ETDEWEB)

    Bodamer, Jr., James W.; Bocchino, Robert M.

    1979-11-01

    This Environmental Permit Compliance Plan is intended to assist the Memphis Light, Gas and Water Division in acquiring the necessary environmental permits for their proposed Industrial Fuel Gas Demonstration Plant in a time frame consistent with the construction schedule. Permits included are those required for installation and/or operation of gaseous, liquid and solid waste sources and disposal areas. Only those permits presently established by final regulations are described. The compliance plan describes procedures for obtaining each permit from identified federal, state and local agencies. The information needed for the permit application is presented, and the stepwise procedure to follow when filing the permit application is described. Information given in this plan was obtained by reviewing applicable laws and regulations and from telephone conversations with agency personnel on the federal, state and local levels. This Plan also presents a recommended schedule for beginning the work necessary to obtain the required environmental permits in order to begin dredging operations in October, 1980 and construction of the plant in September, 1981. Activity for several key permits should begin as soon as possible.

  9. PUREX Storage Tunnels dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-12-01

    This report is part of a dangerous waste permit application for the storage of wastes from the Purex process at Hanford. Appendices are presented on the following: construction drawings; HSW-5638, specifications for disposal facility for failed equipment, Project CA-1513-A; HWS-8262, specification for Purex equipment disposal, Project CGC 964; storage tunnel checklist; classification of residual tank heels in Purex storage tunnels; emergency plan for Purex facility; training course descriptions; and the Purex storage tunnels engineering study

  10. Lean in Air Permitting Guide

    Science.gov (United States)

    The Lean in Air Permitting Guide is designed to help air program managers at public agencies better understand the potential value and results that can be achieved by applying Lean improvement methods to air permitting processes.

  11. Pacific Islands Region Fishing Permits

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — The Sustainable Fisheries Division Permits Program issues around 300 permits annually for pelagic longline and troll & handline, bottomfish, crustacean (lobster...

  12. Vessel Permit System Data Set

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — GARFO issues federal fishing permits annually to owners of fishing vessels who fish in the Greater Atlantic region, as required by federal regulation. These permits...

  13. Hazardous waste incinerator permitting in Texas from inception to operation

    International Nuclear Information System (INIS)

    Simms, M.D.; McDonnell, R.G. III

    1991-01-01

    The regulatory permitting process for hazardous waste incinerators i a long and arduous proposition requiring a well-developed overall strategy. In Texas, RCRA permits for the operation of hazardous waste incinerator facilities are issued through the federally delegated Texas Water Commission (TWC). While the TWC has primacy in the issuance of RCRA permits for hazardous waste incinerators, the Texas Air Control Board (TACB) provides a significant portion of the Part B application review and provides much of the permit language. In addition to dealing with regulatory agencies, RCRA permitting provides by significant public involvement. Often the lack of public support becomes a major roadblock for an incinerator project. In order to establish an effective strategy which addresses the concerns of regulatory agencies and the public, it is important to have an understanding of the steps involved in obtaining a permit. A permit applicant seeking to construct a new hazardous waste incinerator can expect to go through a preapplication meeting with government regulators, a site selection process, file an application, respond to calls for additional technical information from both the TACB and the TWC, defend the application in a hearing, have a recommendation from a TWC hearing examiner and, finally, receive a determination from the TWC's Commissioners. Presuming a favorable response from the Commission, the permittee will be granted a trial burn permit and may proceed with the construction, certification and execution of a trial burn at the facility. Subsequent to publication of the trial burn results and approval by the TWC, the permittee will possess an operational hazardous waste incinerator permit. The paper describes the major steps required to receive an operational permit for a hazardous waste incinerator in the State of Texas. Important issues involved in each step will be discussed including insights gained from recent incinerator permitting efforts

  14. PSD permit compliance strategies

    International Nuclear Information System (INIS)

    Cassada, J.; Astruc, S.

    1993-01-01

    Old Dominion is a not-for-profit generation and transmission cooperative owned by and serving twelve member electric distribution cooperatives in Virginia, Maryland and Delaware. These member cooperatives purchase from Old Dominion all the electric power they supply to over 345,000 member consumers. In 1988, Old Dominion evaluated its long term power needs, and the fact that 300 Megawatts (MW) of base power would have to be replaced by the end of 1994. A power supply alternative study was conducted, and concluded that the interests of the cooperative members would best be served through the construction of a conventional pulverized coal-fired generating units. After comprehensive evaluation and negotiations, Old Dominion signed a contract in April, 1989 with the Consortium of Combustion Engineering, H. B. Zachry, Black ampersand Veatch and Westinghouse for the turnkey construction of a 393 MW coal-fired facility. The contract included an option to build a second twin unit. This option was exercised in August, 1989, when Virginia Power joined Old Dominion as 50% partners in the Clover Project. The partnership agreement stipulates that Old Dominion is responsible for the licensing and construction of the plant and Virginia Power will be responsible for operations

  15. Air quality permits in Texas and New Mexico

    International Nuclear Information System (INIS)

    Fusselman, D.K.; Hofmann, J.E.

    1991-01-01

    Permitting gas processing equipment ranges from fairly simple procedures under the Texas Air Control Board (TACB) Standard Exemption List and the New Mexico Environmental Improvement Division (NMEID) Registration Regulations to an extremely complicated procedure requiring a federal Prevention of Significant Deterioration (PSD) and/or non-attainment review. The following topics relating to obtaining air permits for gas plants will be addressed in this paper: Type of permit/exemption necessary for construction, Specific permit/exemption requirements, New Source Performance Standards (NSPS) Subparts KKK, LLL, GG, K, Ka and Kb, Potential effects of the Federal Clean Air Act Amendments (FCAA). This paper only addresses specific permitting concerns and requirements that apply to the natural gas production industry. The same requirements apply to other industries, with possible additional requirements of National Emission Standards for Hazardous Air Pollutants (NESHAP), NSPS other than Subparts KKK, LLL, GG, K, Ka and Kb, and non-attainment review for pollutants other than ozone

  16. Project W-314 phase I environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document describes the range of environmental actions, including required permits and other agency approvals, for Project W-314 activities in the Hanford Site's Tank Waste Remediation System. This document outlines alternative approaches to satisfying applicable environmental standards, and describes selected strategies for acquiring permits and other approvals needed for waste feed delivery to proceed. This document also includes estimated costs and schedule to obtain the required permits and approvals based on the selected strategy. It also provides estimated costs for environmental support during design and construction based on the preliminary project schedule provided

  17. Permitting plan for project W-236B, initial pretreatment module

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    The Tank Waste Remediation System pretreatment process mission is to separate high-level and low-level waste fractions. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before construction and operation of the facility. This revised document provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the probability of success for each alternative for the Initial Pretreatment Module resulting from recent revisions to the Tri-Party Agreement

  18. Permitting plan for Project W-340, Tank 241-C-106 manipulator retrieval arm

    International Nuclear Information System (INIS)

    Tollefson, K.S.

    1995-01-01

    This document describes the regulatory requirements and describes alternative strategies for obtaining permits and approvals for Project W-340, Tank 241-C-106 Manipulator Retrieval Arm. A comprehensive review of environmental regulations has indicated that several environmental reviews, permits, and approvals are required before design, construction, and operation of the facility. The environmental reviews, permits, and approvals, as well the regulatory authority potentially applicable to the Project W-340 Long Reach Manipulator Arm include the following: National Environmental Policy Act of 1969 -- US Department of Energy, Headquarters; State Environmental Policy Act of 1971 -- State of Washington Department of Ecology; Air Permitting; Dangerous Waste Permitting; Miscellaneous Reviews/Permits/Approvals. This document describes the environmental reviews, permits, and approval requirements for the project. It provides a summary of permit application data requirements, alternative strategies for permit completion and approval, as well as the estimated probability of success for each alternative strategy

  19. Noncooperative models of permit markets

    Energy Technology Data Exchange (ETDEWEB)

    Godal, Odd

    2011-07-15

    The applicability of some popular and basic permit market theories has been questioned. Drawing on noncooperative equilibrium theory for pure exchange economies, this article adapts several well-established alternative models to permit exchange. Some qualitative properties of the associated equilibria are provided, including two games with equilibria that in a sense coincide. Nevertheless, as there exist quite a few models potentially applicable to emissions trading, with equilibria that range from autarky to Pareto optimality, it seems that economics lacks a broadly accepted basic theory for permit markets. (Author)

  20. Regulatory Review of Early Site Permit Applications

    International Nuclear Information System (INIS)

    Scott, Michael L.

    2004-01-01

    The U.S. Nuclear Regulatory Commission (NRC) has received and is reviewing three applications for early site permits (ESPs). The ESP process allows early resolution of site-related issues affecting possible construction and operation of a new nuclear power plant. The nuclear industry views a successful and predictable ESP process as an important step in assessing whether to seek authorization to construct and operate a new generation of nuclear power reactors in the United States. Because consideration of ESP applications is a first-of-a-kind activity, a number of issues have emerged prior to and during the reviews of the first three applications. Issues have included the need for design information at the ESP stage, accident analyses, quality assurance, and seismic analyses. The NRC has been working to resolve identified issues to support a Commission decision on whether to issue an ESP approximately 33-37 months after receipt of each ESP application. (authors)

  1. Permit trading and credit trading

    DEFF Research Database (Denmark)

    Boom, Jan-Tjeerd; R. Dijstra, Bouwe

    This paper compares emissions trading based on a cap on total emissions (permit trading) and on relative standards per unit of output (credit trading). Two types of market structure are considered: perfect competition and Cournot oligopoly. We find that output, abatement costs and the number...... of firms are higher under credit trading. Allowing trade between permit-trading and credit-trading sectors may increase in welfare. With perfect competition, permit trading always leads to higher welfare than credit trading. With imperfect competition, credit trading may outperform permit trading....... Environmental policy can lead to exit, but also to entry of firms. Entry and exit have a profound impact on the performance of the schemes, especially under imperfect competition. We find that it may be impossible to implement certain levels of total industry emissions. Under credit trading several levels...

  2. Factors Influencing Learner Permit Duration

    Directory of Open Access Journals (Sweden)

    Johnathon P. Ehsani

    2016-12-01

    Full Text Available An increasing number of countries are requiring an extended learner permit prior to independent driving. The question of when drivers begin the learner permit period, and how long they hold the permit before advancing to independent licensure has received little research attention. Licensure timing is likely to be related to “push” and “pull” factors which may encourage or inhibit the process. To examine this question, we recruited a sample of 90 novice drivers (49 females and 41 males, average age of 15.6 years soon after they obtained a learner permit and instrumented their vehicles to collect a range of driving data. Participants completed a series of surveys at recruitment related to factors that may influence licensure timing. Two distinct findings emerged from the time-to-event analysis that tested these push and pull factors in relation to licensure timing. The first can be conceptualized as teens’ motivation to drive (push, reflected in a younger age when obtaining a learner permit and extensive pre-permit driving experience. The second finding was teens’ perceptions of their parents’ knowledge of their activities (pull; a proxy for a parents’ attentiveness to their teens’ lives. Teens who reported higher levels of their parents’ knowledge of their activities took longer to advance to independent driving. These findings suggest time-to-licensure may be related to teens’ internal motivation to drive, and the ability of parents to facilitate or impede early licensure.

  3. The National Solar Permitting Database

    Energy Technology Data Exchange (ETDEWEB)

    2014-08-31

    "The soft costs of solar — costs not associated with hardware — remain stubbornly high. Among the biggest soft costs are those associated with inefficiencies in local permitting and inspection. A study by the National Renewable Energy Laboratory and Lawrence Berkeley National Laboratory estimates that these costs add an average of $0.22/W per residential installation. This project helps reduce non-hardware/balance of system (BOS) costs by creating and maintaining a free and available site of permitting requirements and solar system verification software that installers can use to reduce time, capital, and resource investments in tracking permitting requirements. Software tools to identify best permitting practices can enable government stakeholders to optimize their permitting process and remove superfluous costs and requirements. Like ""a Wikipedia for solar permitting"", users can add, edit, delete, and update information for a given jurisdiction. We incentivize this crowdsourcing approach by recognizing users for their contributions in the form of SEO benefits to their company or organization by linking back to users' websites."

  4. 50 CFR 679.4 - Permits.

    Science.gov (United States)

    2010-10-01

    ... this section, with the exception that an IFQ hired master permit or a CDQ hired master permit need not... program permit or card type is: Permit is in effect from issue date through the end of: For more... section (C) Halibut & sablefish hired master permits Specified fishing year Paragraph (d)(2) of this...

  5. 75 FR 35516 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2010-06-22

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2010-0147] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... with the Class 1 location portion of a 7.4 mile natural gas pipeline to be constructed in Alaska. This...

  6. FIRE PERMIT NOW ON EDH!

    CERN Multimedia

    TIS General Safety Group or

    2001-01-01

    The electronic version of the Fire Permit form is now active. The aim of the Fire Permit procedure is to reduce the risk of fire or explosion. It is mandatory when performing 'hot work' (mainly activities which involve the use of naked flames or other heat sources - e.g. welding, brazing, cutting, grinding, etc.). Its use is explained in the CERN Fire Protection Code E. (Fire Protection) The new electronic form, which is substantially unchanged from the previous authorizing procedure, will be available on the Electronic Document Handling system (https://edh.cern.ch/) as of 1st September 2001. From this date use of the paper version should be discontinued.

  7. Waste-to-energy permitting sourcebook

    International Nuclear Information System (INIS)

    Longwell, D.; Wegrecki, A.; Williams, D.

    1992-10-01

    Environmental issues, regulatory processes and approvals important in obtaining a permit to construct and/or operate a waste-to-energy (WTE) facility are identified and discussed. Environmental issues include: (1) air emission levels, their control and potential impacts, (2) ash leachability, treatment, and disposal, (3) potential health risks from emissions, and (4) other issues such as need/benefit and public perception of WTE. Laws, regulations and approvals that can affect project development are identified and listed, and potential regulatory trends are discussed. A general permit acquisition plan is also presented. An analysis of environmental and regulatory data obtained from the literature, regulatory agencies, and specific projects is presented. California and Massachusetts, both with regulations generally more stringent than federal regulations and considered environmentally conservative, were selected for detailed state regulatory review. Two project case histories (Commerce Refuse-to-Energy (RTE) Project in California and SEMASS WTE Project in Massachusetts) were selected to illustrate: (1) how regulations are actually applied to a project, (2) project-specific permit and operating conditions, and (3) project-specific environmental issues. Modern WTE plots employ state-of-the-art air emission control technologies and strategies to reduce air emission is to levels below regulatory requirements and to reduce estimated health risks to within EPA's acceptable risk range. WTE ash leachate can exhibit hazardous waste characteristics, primarily lead and cadmium. However, modern landfills utilize liners and leachate collection systems to prevent infiltration of leachate into the groundwater supply. Modern WTE plants employ dry systems and have zero process wastewater discharge

  8. Hydroelectric Generating Facilities General Permit ...

    Science.gov (United States)

    2017-08-28

    The Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of Massachusetts was published in the Federal Register on December 7, 2009 (see 74 Fed. Reg. No. 233, pages 64074 - 64075).

  9. 50 CFR 660.25 - Permits.

    Science.gov (United States)

    2010-10-01

    ... change and the reasons for the request. If the permit requested to be changed to the base permit is..., vessel owner, or permit owner for any reason. The sablefish at-sea processing exemption will expire upon... ownership. (G) For a request to change a permit's ownership that is necessitated by divorce, the individual...

  10. 76 FR 40355 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Science.gov (United States)

    2011-07-08

    .... FOR FURTHER INFORMATION CONTACT: Greg Schaner, Water Permits Division, Office of Wastewater Management... under the impression that the June 30, 2011 date provided sufficient time to finalize a new permit... construction projects, with streamlined authorization procedures and best management practice (BMP...

  11. Project W-521, waste feed delivery systems environmental permits and approvals plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    1999-01-01

    This document has been prepared to define the specific environmental requirements applicable to Project W-521. The document describes the permits and approvals necessary for the project to design, construct, and install planned upgrades, and provides a schedule of activities and provides cost estimates to complete the required permitting and approval activities

  12. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Bridges not requiring a USCG permit. 650.805 Section 650... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... permit is not required for bridge construction. This determination shall be made at an early stage of...

  13. Low-level burial grounds dangerous waste permit application design documents

    International Nuclear Information System (INIS)

    1990-08-01

    This document serves a supplement to the already existing ''Low-Level Burial Ground Dangerous Waste Permit Application Design Documents.'' This paper contains information regarding drawings, construction specifications, and liner/leachate compatibility test plans

  14. NPDES permits and water analyses

    International Nuclear Information System (INIS)

    Pojasek, R.B.

    1975-01-01

    Provisions of the Federal Water Pollution Control Act, as amended by P. L. 92-500, including an explanation of the National Pollutant Discharge Elimination System (NPDES), and EPA's criteria for the analysis of pollutants are discussed. The need for a revision of current restrictive variance procedures is pointed out. References for the comparison of analytical methods for water pollutants under permits, including radioactive parameters, are tabulated. (U.S.)

  15. Permit processes for nuclear power. International lessons

    International Nuclear Information System (INIS)

    Gaahlin, Emil; Nilsson, Isabelle; Pettersson, Maria; Soederholm, Patrik

    2010-01-01

    permitting process in the country as well as important planned (or recently introduced) changes in the relevant legislation. The analysis also presents the role of the regulating authorities as well as other key actors in the process, and outlines the different steps of the permitting processes, including the relationships between the different permits. We also address the responsibility for the radioactive waste and dismantling, and how these issues come into the licensing process. Important differences and similarities across the various countries are highlighted, with special emphasis on parallels to the Swedish legislation. The report then analyzes a number of important legal and political issues of a principal nature in the permitting of nuclear power plants. We compare how the different countries differ on these grounds, and also emphasize some overall lessons and practical experiences of nuclear power development internationally. Three broad issues are discussed. The first of these concerns the notion of nuclear power as a highly political issue, and we analyze the role of the public opinion, the extent to which the regulatory process is independent of policy decisions, as well as the allocation of political power between the national and local levels in the respective countries. Not the least the last issue has been in focus in some of the countries that have reformed their permitting process, and there exist significant inter-country differences. The second issue concerns how a number of countries - most notably the USA and Great Britain - have attempted to streamline their plant permitting processes for new nuclear power. These reforms are characterized by, for instance, a combined construction and operation license, the selection (and exclusion) of geographical locations for new installations, as well as attempts to achieve standardizations of nuclear reactor designs. We pay particular attention to the issues of reactor design standardization, including the scope

  16. Constructed Wetlands

    Science.gov (United States)

    these systems can improve water quality, engineers and scientists construct systems that replicate the functions of natural wetlands. Constructed wetlands are treatment systems that use natural processes

  17. Design and construction of hazardous waste landfill components

    International Nuclear Information System (INIS)

    Frano, A.J.; Numes, G.S.

    1985-01-01

    This paper discusses design and construction of two sections of a hazardous waste landfill at Peoria Disposal Company's hazardous waste management facilities in central Illinois. One section, an existing disposal facility, was retrofitted with leachate control and containment features for additional security. The second section, a new facility which had been previously permitted for development with a single clay liner, was modified to include a double liner and revised leachate collection system for additional security, and an all-weather construction and operation access ramp. The two sections of the landfill were granted a development permit allowing construction. An operating permit was granted after construction and certification by the designer allowing waste disposal operations. The sections will be accepting waste material at publication. Design and construction included: planning studies, design analyses, permitting, preparation of construction contract documents, construction assistance, monitoring construction, and certification

  18. Forest Products Industry Permitting Information

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  19. 5 CFR 734.202 - Permitted activities.

    Science.gov (United States)

    2010-01-01

    ... (CONTINUED) POLITICAL ACTIVITIES OF FEDERAL EMPLOYEES Permitted Activities § 734.202 Permitted activities. Employees may take an active part in political activities, including political management and political campaigns, to the extent not expressly prohibited by law and this part. ...

  20. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  1. Rosebud Casino and Hotel NPDES Proposed Permit

    Science.gov (United States)

    Indian Country, Minor Permit, proposed permit SD-0034584, Rosebud Casino and Hotel, South Dakota, is authorized to discharge from its wastewater treatment facility in Todd County, South Dakota to an unnamed drainageway(s) tributary to Rock Creek.

  2. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  3. Construction management

    CERN Document Server

    Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín

    2014-01-01

    The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...

  4. Early Site Permit, The Assessment of a Site

    International Nuclear Information System (INIS)

    Copete, M.; Cervantes, E.; Sabate, R.

    2010-01-01

    The vast majority of today's power plants were licensed during the 60s, 70s and 80s. Commercial nuclear energy was new, and the regulatory process evolved along with the new industry. Plants were issued a construction permit based on a preliminary design. Safety issues were not fully resolved until the plant was essentially complete, which meant utilities had high risks of increasing costs and schedule as well as the public did not have access to the details of the design until construction was nearly complete. To address these issues, the U.S. Nuclear Regulatory Commission (NRC) in 1989 established a new licensing process: 10 CFR Part 52.

  5. 7 CFR 319.75-3 - Permits.

    Science.gov (United States)

    2010-01-01

    ... Animal and Plant Health Inspection Service, Plant Protection and Quarantine, Port Operations, Permit Unit... article may be imported only after issuance of a written permit by Plant Protection and Quarantine. (b) An application for a written permit should be submitted to the Animal and Plant Health Inspection Service, Plant...

  6. 77 FR 25082 - Picture Permit Imprint Indicia

    Science.gov (United States)

    2012-04-27

    ... POSTAL SERVICE 39 CFR Part 111 Picture Permit Imprint Indicia AGENCY: Postal Service\\TM\\. ACTION... Service, Domestic Mail Manual (DMM[supreg]) 604.5 to add picture permit imprint indicia standards allowing...: The use of picture permit imprint indicia is designed to improve the effectiveness of a mailpiece by...

  7. 40 CFR 70.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 70.5(d) of this part. (B) Prompt reporting of deviations from permit requirements, including those... corrective actions or preventive measures taken. The permitting authority shall define “prompt” in relation... and air pollution control equipment), practices, or operations regulated or required under the permit...

  8. Annual Hanford Site Environmental Permitting Status Report

    International Nuclear Information System (INIS)

    HOMAN, N.A.

    2000-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. This status report also addresses Permit Condition I.E.22, as interpreted in Section 12.1.25 of the Hanford Facility Dangerous Waste Permit Application, General Information Portion (DOE/RL-91-28, Rev. 4), that states this report will be prepared annually and a copy of this report will be placed in the Facility Operating Record, General Information file by October 1 of each year

  9. Annual Hanford Site Environmental Permitting status report

    International Nuclear Information System (INIS)

    SONNICHSEN, J.C.

    1999-01-01

    The information contained in, and/or referenced in, this Annual Hanford Site Environmental Permitting Status Report addresses Permit Condition II.W (Other Permits and/or Approvals) of the Dangerous Waste Portion of the Resource Conservation and Recovery Act Permit for the Treatment, Storage, and Disposal of Dangerous Waste, issued by the Washington State Department of Ecology (WA7890008967). Condition II.W specifies that the Permittees are responsible for obtaining all other applicable federal, state, and local permits authorizing the development and operation of the Hanford Facility. Condition II.W further specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of this Permit Condition, ''best efforts'' mean submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies

  10. 41 CFR 102-74.500 - Can Federal agencies disapprove permit applications or cancel issued permits?

    Science.gov (United States)

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Can Federal agencies disapprove permit applications or cancel issued permits? 102-74.500 Section 102-74.500 Public Contracts and... cancel issued permits? Yes, Federal agencies may disapprove any permit application or cancel an issued...

  11. 76 FR 8395 - Issuance of a Presidential Permit Authorizing the Expansion, Renovation, Operation, and...

    Science.gov (United States)

    2011-02-14

    ... Department of State at such time as the construction authorized by this permit is begun, and again at such time as construction is completed, interrupted for more than ninety days or discontinued. Article 11... Administrative Building Entry and Exit Control Booths Roadways and related Infrastructure, Pathways, Parking Lots...

  12. Electrochemical construction

    Science.gov (United States)

    Einstein, Harry; Grimes, Patrick G.

    1983-08-23

    An electrochemical cell construction features a novel co-extruded plastic electrode in an interleaved construction with a novel integral separator-spacer. Also featured is a leak and impact resistant construction for preventing the spill of corrosive materials in the event of rupture.

  13. Usability Constructs

    DEFF Research Database (Denmark)

    Hertzum, Morten; Clemmesen, Torkil; Hornbæk, Kasper Anders Søren

    2007-01-01

    Whereas research on usability predominantly employs universal definitions of the aspects that comprise usability, people experience their use of information systems through personal constructs. Based on 48 repertory-grid interviews, this study investigates how such personal constructs are affected...... use of constructs traditionally associated with usability (e.g., easy-to-use, intuitive, and liked). Further analysis of the data is ongoing...

  14. Intertemporal Permit Trading for the Control of Greenhouse Gas Emissions

    International Nuclear Information System (INIS)

    Leiby, P.; Rubin, J.

    2001-01-01

    This paper integrates two themes in the intertemporal permit literature through the construction of an intertemporal banking system for a pollutant that creates both stock and flow damages. A permit banking system for the special case of a pollutant that only causes stock damages is also developed. This latter, simpler case corresponds roughly to the greenhouse gas emission reduction regime proposed by the U.S. Department of State as a means of fulfilling the U.S. commitment to the Framework Convention on Climate Change. This paper shows that environmental regulators can achieve the socially optimal level of emissions and output through time by setting the correct total sum of allowable emissions, and specifying the correct intertemporal trading ratio for banking and borrowing. For the case of greenhouse gases, we show that the optimal growth rate of permit prices, and therefore the optimal intertemporal trading rate, has the closed-form solution equal to the ratio of current marginal stock damages to the discounted future value of marginal stock damages less the decay rate of emissions in the atmosphere. Given a non-optimal negotiated emission path we then derive a permit banking system that has the potential to lower net social costs by adjusting the intertemporal trading ratio taking into account the behavior of private agents. We use a simple numerical simulation model to illustrate the potential gains from various possible banking systems. 24 refs

  15. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2001-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document is updated on a quarterly basis

  16. RPP Environmental Permits and Related Documentation

    International Nuclear Information System (INIS)

    DEXTER, M.L.

    2000-01-01

    This document contains the current list of environmental permits and related documentation for RPP facilities and activities. Copies of these permits and related approvals are maintained by RPP Environmental. In addition, Notices of Correction and Notices of Violation are issued by State and Federal Regulators which are tracked by RPP Environmental to resolve any recently identified deficiencies. A listing of these recent Notices is provided as an attachment to this document. These permits, approval conditions, and recent regulatory agency notices, constitute an important element of the RPP Authorization Envelope. Permits are issued frequently and the reader is advised to check with RPP environmental for new permits or approval conditions. Interpretation of permit or approval conditions should be coordinated with RPP Environmental. This document will be updated on a quarterly basis

  17. Construction mathematics

    CERN Document Server

    Virdi, Surinder; Virdi, Narinder Kaur

    2014-01-01

    Construction Mathematics is an introductory level mathematics text, written specifically for students of construction and related disciplines. Learn by tackling exercises based on real-life construction maths. Examples include: costing calculations, labour costs, cost of materials and setting out of building components. Suitable for beginners and easy to follow throughout. Learn the essential basic theory along with the practical necessities. The second edition of this popular textbook is fully updated to match new curricula, and expanded to include even more learning exercises. End of chapter exercises cover a range of theoretical as well as practical problems commonly found in construction practice, and three detailed assignments based on practical tasks give students the opportunity to apply all the knowledge they have gained. Construction Mathematics addresses all the mathematical requirements of Level 2 construction NVQs from City & Guilds/CITB and Edexcel courses, including the BTEC First Diploma in...

  18. FFTF constructibility

    International Nuclear Information System (INIS)

    Weber, S.A.; Hulbert, D.I.

    1975-01-01

    The influence of the design criteria on the constructibility of the Fast Flux Test Facility is described. Specifically, the effects of requirements due to maintenance accessibility, inerting of cells, seismicity, codes, and standards are addressed. The design and construction techniques developed to minimize the impact of the design criteria on cost and schedule are presented with particular emphasis on the cleanliness and humidity controls imposed during construction of the sodium systems. (U.S.)

  19. Hanford Waste Vitrification Plant Dangerous Waste Permit Application

    International Nuclear Information System (INIS)

    1991-10-01

    The Hanford Facility currently stores mixed waste, resulting from various processing operations, in underground storage tanks. The Hanford Waste Vitrification Plant will be constructed and operated to process the high-activity fraction of mixed waste stored in these underground tanks. The Hanford Waste Vitrification Plant will solidify pretreated tank waste into a glass product that will be packaged for disposal in a national repository. This Vitrification Plant Dangerous Waste Permit Application, Revision 2, consists of both a Part A and a Part B permit application. An explanation of the Part A revisions, including Revision 4 submitted with this application, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B Checklist prepared by the Washington State Department of Ecology (Ecology 1987)

  20. Information resources for nuclear power construction

    International Nuclear Information System (INIS)

    Rozin, V.M.

    1987-01-01

    Problems of designing and introduction of data resources (in the form of magnetic carrier data) for the construction of NPP with the WWER-1000 type reactors are considered. It is suggested that the data resources should be supplied to the construction as independent production alongside with preliminary estimation and material resources. It is pointed out that the introduction of the data resource will permit to increase the efficiency of NPP construction management

  1. Construction Management.

    Science.gov (United States)

    Abbott, James F.

    This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…

  2. Construction fraud

    NARCIS (Netherlands)

    Graafland, J.J.; Liedekerke, L.; Dubbink, W.; van Liedekerke, L.; van Luijk, H.

    2011-01-01

    Due to the actions of a whistleblower The Netherlands was confronted with a massive case of construction fraud involving almost the entire construction sector. Price fixing, prior consulting, duplicate accounts, fictitious invoices and active corruption of civil servants were rampant practices. This

  3. Superstring construction

    CERN Document Server

    1989-01-01

    The book includes a selection of papers on the construction of superstring theories, mainly written during the years 1984-1987. It covers ten-dimensional supersymmetric and non-supersymmetric strings, four-dimensional heterotic strings and four-dimensional type-II strings. An introduction to more recent developments in conformal field theory in relation to string construction is provided.

  4. 40 CFR 71.6 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... § 71.5(d). (B) Prompt reporting of deviations from permit requirements, including those attributable to... prompt or otherwise specifies a time frame for reporting deviations, that definition or time frame shall... and air pollution control equipment), practices, or operations regulated or required under the permit...

  5. 40 CFR 71.25 - Permit content.

    Science.gov (United States)

    2010-07-01

    ... such reports; and (ii) Prompt reporting of any deviations from permit requirements, including those... “prompt” in the permit for each situation and will do so in relation to the degree and type of deviation... reasonable times any facilities, equipment (including monitoring and air pollution control equipment...

  6. Review and revision of overload permit classification.

    Science.gov (United States)

    2013-02-01

    The Michigan Department of Transportation (MDOT) allows trucks that exceed their legal loads to cross : bridges if they apply and are approved for a permit. More than 30,000 permits have been processed each : year since 2002, providing a vital servic...

  7. 7 CFR 330.208 - Courtesy permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Courtesy permits. 330.208 Section 330.208 Agriculture... PRODUCTS; GARBAGE Movement of Plant Pests § 330.208 Courtesy permits. The Deputy Administrator may issue... subject to regulation under the Plant Protection Actor any other act, as a courtesy to facilitate movement...

  8. 32 CFR 552.90 - Permit office.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 3 2010-07-01 2010-07-01 true Permit office. 552.90 Section 552.90 National... CEMETERIES REGULATIONS AFFECTING MILITARY RESERVATIONS Fort Lewis Land Use Policy § 552.90 Permit office... non-training acess to the range complex. The office is open 0700-1900 hours, seven days a week, for...

  9. 50 CFR 21.31 - Rehabilitation permits.

    Science.gov (United States)

    2010-10-01

    ..., foster parenting, research projects, or other permitted activities with persons permitted or otherwise... Response Coordinator or other designated Service representative and obtain permission from the On-Scene Coordinator. All activities within the location of the spill are subject to the authority of the On-Scene...

  10. 77 FR 10183 - Reissuance of Nationwide Permits

    Science.gov (United States)

    2012-02-21

    ... Civil Works Program (Engineer Circular 1165- 2-211). The current Engineer Circular applies to Corps..., Corps of Engineers Reissuance of Nationwide Permits; Notice #0;#0;Federal Register / Vol. 77 , No. 34..., Corps of Engineers RIN 0710-AA71 Reissuance of Nationwide Permits AGENCY: Army Corps of Engineers, DoD...

  11. 40 CFR 233.21 - General permits.

    Science.gov (United States)

    2010-07-01

    ... ensure compliance with existing permit conditions an any reporting monitoring, or prenotification... apply for an individual permit. This discretionary authority will be based on concerns for the aquatic environment including compliance with paragraph (b) of this section and the 404(b)(1) Guidelines (40 CFR part...

  12. 75 FR 2560 - Issuance of Permits

    Science.gov (United States)

    2010-01-15

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R9-IA-2010-N006] [96300-1671-0000-P5] Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of issuance of permits..., 2009 PH.D, Department of 16, 2009. Cardiology Children's Hospital. Dated: January 8, 2010. Brenda Tapia...

  13. 50 CFR 21.41 - Depredation permits.

    Science.gov (United States)

    2010-10-01

    ... PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Control of Depredating and Otherwise Injurious Birds § 21.41... control purposes. No permit is required merely to scare or herd depredating migratory birds other than... other means of concealment, decoys, duck calls, or other devices to lure or entice birds within gun...

  14. EPA Region 2 Discharge Pipes for Facilites with NPDES Permits from the Permit Compliance GIS Layer

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Permit and Compliance System (PCS) contains data on the National Pollution Discharge Elimination Systems (NPDES) permit-holding facilities. This includes...

  15. Annual Hanford Site environmental permitting status report

    International Nuclear Information System (INIS)

    Sonnichsen, J.C.

    1998-01-01

    The information contained and/or referenced in this Annual Hanford Site Environmental Permitting Status Report (Status Report) addresses the State Environmental Policy Act (SEPA) of 1971 and Condition II.W. of the Resource Conservation and Recovery Act (RCRA) of 1976 Permit, Dangerous Waste Portion (DW Portion). Condition II.W. of the RCRA Permit specifies the Permittees are responsible for all other applicable federal, state, and local permits for the development and operation of the Hanford Facility. Condition II.W. of the RCRA Permit specifies that the Permittees are to use their best efforts to obtain such permits. For the purposes of permit condition, 'best efforts' means submittal of documentation and/or approval(s) in accordance with schedules specified in applicable regulations, or as determined through negotiations with the applicable regulatory agencies. This Status Report includes information on all existing and anticipated environmental permitting. Environmental permitting required by RCRA, the Hazardous and Solid Waste Amendments (HSWA) of 1984, and non-RCRA permitting (solid waste handling, Clean Air Act Amendments of 1990, Clean Water Act Amendments of 1987, Washington State waste discharge, and onsite sewage system) is addressed. Information on RCRA and non-RCRA is current as of July 31, 1998. For the purposes of RCRA and the State of Washington Hazardous Waste Management Act of 1976 [as administered through the Dangerous Waste Regulations, Washington Active Code (WAC) 173-303], the Hanford Facility is considered a single facility. As such, the Hanford Facility has been issued one US Environmental Protection Agency (EPA)/State Identification Number (WA7890008967). This EPA/State identification number encompasses over 60 treatment, storage, and/or disposal (TSD) units. The Washington State Department of Ecology (Ecology) has been delegated authority by the EPA to administer the RCRA, including mixed waste authority. The RCRA permitting approach for

  16. 77 FR 22267 - Eagle Permits; Changes in the Regulations Governing Eagle Permitting

    Science.gov (United States)

    2012-04-13

    ... with rotating wind turbines. Permit Duration and Transferability In February 2011, we published draft... permit applicants, because of the known risk to eagles from collisions with wind turbines and electric... change does not affect the tenure of any other migratory bird or eagle permit type. DATES: Electronic...

  17. Worldwide construction

    International Nuclear Information System (INIS)

    Williamson, M.

    1994-01-01

    The paper lists major construction projects in worldwide processing and pipelining, showing capacities, contractors, estimated costs, and time of construction. The lists are divided into refineries, petrochemical plants, sulfur recovery units, gas processing plants, pipelines, and related fuel facilities. This last classification includes cogeneration plants, coal liquefaction and gasification plants, biomass power plants, geothermal power plants, integrated coal gasification combined-cycle power plants, and a coal briquetting plant

  18. 10 CFR 51.75 - Draft environmental impact statement-construction permit, early site permit, or combined licesne.

    Science.gov (United States)

    2010-01-01

    ... storage of spent fuel for the nuclear power plant within the scope of the generic determination in § 51.23..., and 51.73. The contribution of the environmental effects of the uranium fuel cycle activities....71, 51.72, 51.73, and this section. The contribution of the environmental effects of the uranium fuel...

  19. 10 CFR 51.50 - Environmental report-construction permit, early site permit, or combined license stage.

    Science.gov (United States)

    2010-01-01

    ...-water-cooled nuclear power reactors, the environmental report must contain the basis for evaluating the contribution of the environmental effects of fuel cycle activities for the nuclear power reactor. (4) Each... paragraph. For other than light-water-cooled nuclear power reactors, the environmental report shall contain...

  20. 78 FR 58270 - Cleveland National Forest, California, SDG&E Master Special Use Permit and Permit To Construct...

    Science.gov (United States)

    2013-09-23

    ... DEPARTMENT OF AGRICULTURE Forest Service Cleveland National Forest, California, SDG&E Master... Environmental Impact Statement (EIR/EIS), for the San Diego Gas & Electric Company (SDG&E) Master Special Use... authorize SDG&E to upgrade and/or relocate certain electric powerlines on National Forest System lands...

  1. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  2. 78 FR 36822 - Special Permit Applications

    Science.gov (United States)

    2013-06-19

    ... lithium battery that exceeds the net quantity weight restriction when transported by motor vehicle and... Dassault Falcon Jet Corp. Little Ferry, NJ May 13, 2013. To modify the special permit to add an additional...

  3. 32 CFR 935.11 - Permits.

    Science.gov (United States)

    2010-07-01

    ... shall be issued under other authority that is inconsistent with this part. The Commander may issue.... (b) To the extent it is not inconsistent with this part, any permit or registration issued pursuant...

  4. 50 CFR 660.707 - Permits.

    Science.gov (United States)

    2010-10-01

    ... or downloaded from the Southwest Region home page (http://swr.nmfs.noaa.gov/permits.htm) to apply for... the vessel is fishing for, taking, retaining, possessing, or landing HMS shoreward of the outer...

  5. 77 FR 4271 - Special Permit Marking Removal

    Science.gov (United States)

    2012-01-27

    ... the logistical and cost concerns regarding the ability of the railroad industry to comply with the... incorporating the applicable GRL Special Permits into the HMR (and FRA's subsequent approval notice) those...

  6. Web Air Permits (WAP R7)

    Data.gov (United States)

    U.S. Environmental Protection Agency — THIS DATA ASSET NO LONGER ACTIVE: This is metadata documentation for Web Air Permits in Region 7 (WAP R7), a Lotus Notes application that once tracked comment...

  7. 2013 EPA Vessels General Permit (VGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — Information for any vessel that submitted a Notice of Intent (NOI), Notice of Termination (NOT), or annual report under EPA's 2013 Vessel General Permit (VGP)....

  8. Gulf of Mexico Shrimp Permit Gear Survey

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Data set contains annual vessel gear characterization of permit holders shrimp vessel. Data includes net type, TED type, BRD type, etc.

  9. 2011 EPA Pesticide General Permit (PGP)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The 2011 EPA Pesticide General Permit (PGP) covers discharges of biological pesticides, and chemical pesticides that leave a residue, in areas where EPA is the NPDES...

  10. WIPP's Hazardous Waste Facility Permit Renewal Application

    International Nuclear Information System (INIS)

    Most, W.A.; Kehrman, R.F.

    2009-01-01

    Hazardous waste permits issued by the New Mexico Environment Department (NMED) have a maximum term of 10-years from the permit's effective date. The permit condition in the Waste Isolation Pilot Plant's (WIPP) Hazardous Waste Facility Permit (HWFP) governing renewal applications, directs the Permittees to submit a permit application 180 days prior to expiration of the Permit. On October 27, 1999, the Secretary of the NMED issued to the United States Department of Energy (DOE), the owner and operator of WIPP, and to Washington TRU Solutions LLC (WTS), the Management and Operating Contractor and the cooperator of WIPP, a HWFP to manage, store, and dispose hazardous waste at WIPP. The DOE and WTS are collectively known as the Permittees. The HWFP is effective for a fixed term not to exceed ten years from the effective date of the Permit. The Permittees may renew the HWFP by submitting a new permit application at least 180 calendar days before the expiration date, of the HWFP. The Permittees are not proposing any substantial changes in the Renewal Application. First, the Permittees are seeking the authority to dispose of Contact-Handled and Remote-Handled TRU mixed waste in Panel 8. Panels 4 through 7 have been approved in the WIPP Hazardous Waste Facility Permit as it currently exists. No other change to the facility or to the manner in which hazardous waste is characterized, managed, stored, or disposed is being requested. Second, the Permittees also seek to include the Mine Ventilation Rate Monitoring Plan, as Attachment Q in the HWFP. This Plan has existed as a separate document since May 2000. The NMED has requested that the Plan be submitted as part of the Renewal Application. The Permittees have been operating to the Mine Ventilation Rate Monitoring Plan since the Plan was submitted. Third, some information submitted in the original WIPP RCRA Part B Application has been updated, such as demographic information. The Permittees will submit this information in the

  11. Permitting mixed waste treatment, storage and disposal facilities: A mixed bag

    International Nuclear Information System (INIS)

    Ranek, N.L.; Coalgate, J.L.

    1995-01-01

    The Federal Facility Compliance Act of 1992 (FFCAct) requires the U.S. Department of Energy (DOE) to make a comprehensive national inventory of its mixed wastes (i.e., wastes that contain both a hazardous component that meets the Resource Conservation and Recovery Act (RCRA) definition of hazardous waste and a radioactive component consisting of source, special nuclear, or byproduct material regulated under the Atomic Energy Act (AEA)), and of its mixed waste treatment technologies and facilities. It also requires each DOE facility that stores or generates mixed waste to develop a treatment plan that includes, in part, a schedule for constructing units to treat those wastes that can be treated using existing technologies. Inherent in constructing treatment units for mixed wastes is, of course, permitting. This paper identifies Federal regulatory program requirements that are likely to apply to new DOE mixed waste treatment units. The paper concentrates on showing how RCRA permitting requirements interrelate with the permitting or licensing requirements of such other laws as the Atomic Energy Act, the Clean Water Act, and the Clean Air Act. Documentation needed to support permit applications under these laws are compared with RCRA permit application documentation. National Environmental Policy Act (NEPA) documentation requirements are also addressed, and throughout the paper, suggestions are made for managing the permitting process

  12. Construction safety

    CERN Document Server

    Li, Rita Yi Man

    2013-01-01

    A close-to-ideal blend of suburb and city, speedy construction of towers of Babylon, the sparkling proportion of glass and steel buildings’ facade at night showcase the wisdom of humans. They also witness the footsteps, sweats and tears of architects and engineers. Unfortunately, these signatures of human civilizations are swathed in towering figures of construction accidents. Fretting about these on sites, different countries adopt different measures on sites. This book firstly sketches the construction accidents on sites, followed by a review on safety measures in some of the developing countries such as Bermuda, Egypt, Kuwait and China; as well as developed countries, for example, the United States, France and Singapore. It also highlights the enormous compensation costs with the courts’ experiences in the United Kingdom and Hong Kong.

  13. Constructing sanctions

    DEFF Research Database (Denmark)

    Jaeger, Mark Daniel

    2016-01-01

    such an effect. This paper explores sanctions conflicts as social constructs. It purports that rally-around-the-flag is all but one part of the discursive dimension of sanctions conflicts. Sanctions are intricately connected with the conflict setting they occur in. The study suggests a dialectical relation...... between how opponents perceive conflicts and the meaning of sanctions therein. This nexus of different constructions of sanctions moreover extends to “targeted” sanctions as well: As restrictive measures against Zimbabwe demonstrate, they are not the kind of minimally-invasive operations with clinical...

  14. 40 CFR 270.62 - Hazardous waste incinerator permits.

    Science.gov (United States)

    2010-07-01

    ... WASTES (CONTINUED) EPA ADMINISTERED PERMIT PROGRAMS: THE HAZARDOUS WASTE PERMIT PROGRAM Special Forms of Permits § 270.62 Hazardous waste incinerator permits. When an owner or operator of a hazardous waste... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Hazardous waste incinerator permits...

  15. 30 CFR 773.10 - Review of permit history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of permit history. 773.10 Section 773.10... REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.10 Review of permit history. (a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this...

  16. 40 CFR 60.4124 - Hg budget permit revisions.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit revisions. 60.4124... Coal-Fired Electric Steam Generating Units Permits § 60.4124 Hg budget permit revisions. Except as provided in § 60.4123(b), the permitting authority will revise the Hg Budget permit, as necessary, in...

  17. Construction work

    CERN Multimedia

    2004-01-01

    Construction work on building 179 will start on the 16th February 2004 and continue until November 2004. The road between buildings 179 and 158 will temporarily become a one way street from Route Democrite towards building 7. The parking places between buildings 179 and 7 will become obsolete. The ISOLDE collaboration would like to apologize for any inconveniences.

  18. Indigenous lunar construction materials

    Science.gov (United States)

    Rogers, Wayne P.; Sture, Stein

    1991-01-01

    design of the lunar shelter showed us that joining is a critical technology needed for building a structure from large segments. The problem of joining is important to the design of any structure that is not completely prefabricated. It is especially important when the structure is subjected to tensile loading by an internal pressure. For a lunar shelter constructed from large segments the joints between these large segments must be strong, and they must permit automated construction. With a cast basalt building material which is brittle, there is the additional problem of connecting the joint with the material and avoiding stress concentration that would cause failure. Thus, a well-defined project which we intend to pursue during this coming year is the design of joints for cast basalt structural elements.

  19. 9 CFR 78.2 - Handling of certificates, permits, and “S” brand permits for interstate movement of animals.

    Science.gov (United States)

    2010-01-01

    ... âSâ brand permits for interstate movement of animals. 78.2 Section 78.2 Animals and Animal Products... certificates, permits, and “S” brand permits for interstate movement of animals. (a) Any certificate, permit, or “S” brand permit required by this part for the interstate movement of animals shall be delivered...

  20. 76 FR 22891 - Modification to 2008 National Pollutant Discharge Elimination System (NPDES) General Permit for...

    Science.gov (United States)

    2011-04-25

    ... statements and data pertaining to the proposed permit at the public hearing. E. Finalizing This Action This... in the December 2009 final rule regarding the calculation of the numeric limitation on turbidity... construction sites to a numeric effluent limitation of 280 NTU for the pollutant turbidity starting in August...

  1. The CO_2 emission permits market simulation using Continuous Double Auction

    International Nuclear Information System (INIS)

    Bartoszczuk, Pawel; Stanczak, Jaroslaw

    2016-01-01

    In this paper we consider the buying and selling prices of carbon dioxide (CO_2) emission permits in trading models with uncertainty. Permission prices, although usually omitted from standard models, may significantly influence the trading market. We thus construct a more realistic trade model. To do this, we introduced several important changes to the standard model, mainly we added The Continuous Double Action.

  2. 78 FR 24237 - Advisory Committee on Construction Safety and Health (ACCSH)

    Science.gov (United States)

    2013-04-24

    ... arsenic, that may affect construction employees; --Permit digital storage of x-rays (not just film); [cir... Construction, Health and Safety Checklist; Discussion of the 2-hour introduction to the OSHA 10-hour and 30...

  3. 77 FR 71818 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-12-04

    ... following permit requests. Applicant Permit No. TE-78622A Applicant: William J. Mautz, Hilo, Hawaii The...-179036 Applicant: Cullen A. Wilkerson, Richmond, California The applicant requests a permit renewal to...

  4. State Waste Discharge Permit ST-4502 Implementation Plan

    Energy Technology Data Exchange (ETDEWEB)

    BROWN, M.J.; LECLAIR, M.D.

    2000-09-27

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements.

  5. State Waste Discharge Permit ST-4502 Implementation Plan

    International Nuclear Information System (INIS)

    BROWN, M.J.; LECLAIR, M.D.

    2000-01-01

    Plan has been developed to demonstrate compliance with regulatory requirements set forth in Permit ST-3502 and as a line management tool for use in maintaining configuration control of permit as well as documentation used to implement permit requirements

  6. IFQ Halibut/Sablefish and CDQ Halibut Permit Program

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Under the IFQ Halibut/Sablefish Permit Program and CDQ Halibut Permit Program permits are issued for harvesting and receiving/processing halibut, and non-trawl...

  7. Banking and back-loading emission permits

    International Nuclear Information System (INIS)

    Chaton, Corinne; Creti, Anna; Peluchon, Benoît

    2015-01-01

    In this article we focus on the so-called back-loading policy adopted by the European Commission to increase the carbon market price. This environmental measure consists of removing a share of the allowances allocated for a given period in order to reallocate some or all of them later on. To analyze the impact of the permits back-loading, we determine the CO 2 price equilibrium with and without the policy measure, considering not only the market for permits but also the output market of regulated sectors. We propose a two-period model, where the market for permits is perfectly competitive, and the output market can be either competitive or oligopolistic. First, we define the condition under which banking from one period to another is optimal. This condition, that is the absence of arbitrage opportunities (AOA), depends not only from the period initial allocation but also on production market fundamentals. When this condition is satisfied, the market for emission is shown intertemporally efficient. Second, we point out that the back-loading measure may create inefficiencies or leave unaffected the permits price, if it alters the AOA. -- Highlights: •Relationship between the market for permits and the output market of regulated sectors. •Analysis of CO 2 prices and banking. •Impact of a recent environmental policy measure (backloading) on CO 2 prices

  8. Modelling Constructs

    DEFF Research Database (Denmark)

    Kindler, Ekkart

    2009-01-01

    , these notations have been extended in order to increase expressiveness and to be more competitive. This resulted in an increasing number of notations and formalisms for modelling business processes and in an increase of the different modelling constructs provided by modelling notations, which makes it difficult......There are many different notations and formalisms for modelling business processes and workflows. These notations and formalisms have been introduced with different purposes and objectives. Later, influenced by other notations, comparisons with other tools, or by standardization efforts...... to compare modelling notations and to make transformations between them. One of the reasons is that, in each notation, the new concepts are introduced in a different way by extending the already existing constructs. In this chapter, we go the opposite direction: We show that it is possible to add most...

  9. Hanford facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-01-01

    This document, Set 2, the Hanford Facility Dangerous Waste Part B Permit Application, consists of 15 chapters that address the content of the Part B checklists prepared by the Washington State Department of Ecology (Ecology 1987) and the US Environmental Protection Agency (40 CFR 270), with additional information requirements mandated by the Hazardous and Solid Waste Amendments of 1984 and revisions of WAC 173-303. For ease of reference, the Washington State Department of Ecology checklist section numbers, in brackets, follow the chapter headings and subheadings. This permit application contains ''umbrella- type'' documentation with overall application to the Hanford Facility. This documentation is broad in nature and applies to all TSD units that have final status under the Hanford Facility Permit

  10. 75 FR 19987 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-04-16

    ... applied for scientific research permits to conduct certain activities with endangered species under the...) within Arizona. Permit TE-178778 Applicant: Marks Lab of Aquatic Ecology, Flagstaff, Arizona. Applicant...

  11. 50 CFR 18.31 - Scientific research permits and public display permits.

    Science.gov (United States)

    2010-10-01

    ... the population stock and the marine ecosystem. In determining whether to issue a public display permit... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Scientific research permits and public..., DEPARTMENT OF THE INTERIOR (CONTINUED) TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER...

  12. Constructing Catalonia

    Directory of Open Access Journals (Sweden)

    Bill Philips

    2009-07-01

    Full Text Available Catalonia, in common with other nations, has long been concerned with the question of identity and difference. Its problematic relationship with Spain has led to an emphasis on differentiating itself from its larger neighbour (if we are to accept, as most Spaniards do not, that Catalonia is not Spain, a situation complicated by the loss of the Spanish colonies of Cuba and The Philippines in 1898, and the Spanish Civil War and subsequent dictatorship from 1936 to 1976. Beginning in the late nineteenth century, the construction of a Catalan identity followed a similar route to that taken by other European nations such as England, Ireland and, indeed, Spain, including an emphasis on rural values, activities and the countryside, and the conversion of specifically local traditions into national past times. It is only in the last ten years or so that this model of Catalan identity has been recognised for what it is – a model constructed and encouraged for and by specific nationalist political interests. Ironically, Catalonia’s identity abroad has also been constructed and manipulated for political purposes, but from quite a different perspective. Orwell’s /Homage to Catalonia/ (1938 narrates an extremely blinkered version of the Spanish Civil War which has achieved iconic status as a result of cold war politics. Subsequent portrayals of the Spanish Civil War – Valentine Cunningham’s /The Penguin Book of Spanish Civil War Verse/ (ed., Penguin, 1980, or Ken Loach’s 1995 film /Land and Freedom/ base their arguments unquestioningly on /Homage to Catalonia/, perpetuating a view of the nation’s recent history that is both reductive and inaccurate

  13. Layout Construction

    DEFF Research Database (Denmark)

    Frandsen, Gudmund Skovbjerg; Palsberg, Jens; Schmidt, Erik Meineche

    We design a system for generating newspaper layout proposals. The input to the system consists of editorial information (text, pictures, etc) and style information (non-editorial information that specifies the aesthetic appearance of a layout). We consider the automation of layout construction...... to pose two main problems. One problem consists in optimizing the layout with respect to the constraints and preferences specified in the style information. Another problem consists in finding a representation of the style information that both supports its use in the combinatorial optimization...

  14. Permitting of Wind Energy Facilities: A Handbook

    Energy Technology Data Exchange (ETDEWEB)

    NWCC Siting Work Group

    2002-08-01

    This handbook has been written for individuals and groups involved in evaluating wind projects: decision-makers and agency staff at all levels of government, wind developers, interested parties and the public. Its purpose is to help stakeholders make permitting wind facility decisions in a manner which assures necessary environmental protection and responds to public needs.

  15. 27 CFR 19.157 - Operating permits.

    Science.gov (United States)

    2010-04-01

    ... OF THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Qualification of Distilled Spirits Plants § 19.157... file an application for registration under § 19.151 shall make application for and obtain an operating permit before commencing any of the following operations: (1) Distilling for industrial use. (2...

  16. 75 FR 54649 - Endangered Wildlife; Permits

    Science.gov (United States)

    2010-09-08

    ...-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to take (capture...-listed Drosophila species on the island of Kauai in the State of Hawaii for the purpose of enhancing its... in the State of Hawaii: Astelia waialealae (painiu), Canavalia napaliensis (awikiwiki), Chamaesyce...

  17. 15 CFR 5.4 - Permits.

    Science.gov (United States)

    2010-01-01

    ... standards relating to appearance, safety, sanitation, maintenance, and efficiency of operation. Due regard... the Government and prospective patrons of the stand. (f) The permit shall describe the location of the stand proper and the location of any vending machines which are operated in conjunction with it. ...

  18. 9 CFR 93.802 - Import permit.

    Science.gov (United States)

    2010-01-01

    ... CONVEYANCE AND SHIPPING CONTAINERS Elephants, Hippopotami, Rhinoceroses, and Tapirs § 93.802 Import permit. (a) An elephant, hippopotamus, rhinoceros, or tapir shall not be imported into the United States... export an elephant, hippopotamus, rhinoceros, or tapir to the United States; (2) The name and address of...

  19. 19 CFR 12.107 - Importations permitted.

    Science.gov (United States)

    2010-04-01

    ... TREASURY SPECIAL CLASSES OF MERCHANDISE Pre-Columbian Monumental and Architectural Sculpture and Murals § 12.107 Importations permitted. Pre-Columbian monumental or architectural sculpture or mural for which... sculpture or mural, in a form acceptable to the Secretary, certifying that such exportation was not in...

  20. 78 FR 43268 - Special Permit Applications

    Science.gov (United States)

    2013-07-19

    ... an amount qualifying as hazardous material. (modes 1, 2, 3, 4) 15860-N......... Apple Inc. 49 CFR To... strength stiffness. 13581-M......... Bengal Products 49 CFR To modify the Inc. Baton 173.306(a)(3). special............ Carleton 49 CFR 173.302a To modify the Technologies special permit to Inc. (Former change a drawing Grantee...

  1. 50 CFR 648.4 - Vessel permits.

    Science.gov (United States)

    2010-10-01

    ... carrying passengers for hire. (8) Atlantic bluefish vessels. (i) Commercial. Any vessel of the United... lands Atlantic bluefish in or from the EEZ in excess of the recreational possession limit specified at § 648.164 must have been issued and carry on board a valid commercial bluefish vessel permit. (ii) Party...

  2. Meeting NPDES permit limits for an effluent-dependent stream

    International Nuclear Information System (INIS)

    Payne, W.L.

    1998-01-01

    When the Savannah River Site in Aiken, South Carolina received a National Pollutant Discharge Elimination System permit containing very low copper and toxicity limits for an effluent-dependent stream, an innovative and cost-effective method to meet them was sought. The South Carolina Department of Health and Environmental Control mandated that compliance with the new limits be achieved within three years of the effective date of the permit. SRS personnel studied various regulatory options for complying with the new limits including Water Effect Ratio, use of a Metals Translator, blending with additional effluents, and outfall relocation. Regulatory options were determined to not be feasible because the receiving stream is effluent dependent. Treatment options were studied after it was determined that none of the regulatory pathways were viable. Corrosion inhibitors were evaluated on a full-scale basis with only limited benefits. Ion exchange was promising, but not cost effective for a high flow effluent with a very low concentration of copper. A treatment wetlands, not normally given consideration for the removal of metals, proved to be the most cost effective method studied and is currently under construction

  3. 50 CFR 648.88 - Multispecies open access permit restrictions.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 8 2010-10-01 2010-10-01 false Multispecies open access permit... Management Measures for the NE Multispecies and Monkfish Fisheries § 648.88 Multispecies open access permit restrictions. (a) Handgear permit. A vessel issued a valid open access NE multispecies Handgear permit is...

  4. Renewable Energy Permitting Barriers in Hawaii: Experience from the Field

    Energy Technology Data Exchange (ETDEWEB)

    Busche, S.; Donnelly, C.; Atkins, D.; Fields, R.; Black, C.

    2013-03-01

    This white paper presents a summary of the solicited input from permitting agencies and renewable energy developers on the permitting process in Hawaii to provide stakeholders in Hawaii, particularly those involved in permitting, with information on current permitting barriers that renewable energy developers are experiencing.

  5. 40 CFR 144.51 - Conditions applicable to all permits.

    Science.gov (United States)

    2010-07-01

    ... PROGRAMS (CONTINUED) UNDERGROUND INJECTION CONTROL PROGRAM Permit Conditions § 144.51 Conditions applicable... permit. Any permit noncompliance constitutes a violation of the Safe Drinking Water Act and is grounds... denial of a permit renewal application; except that the permittee need not comply with the provisions of...

  6. 50 CFR 21.21 - Import and export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Import and export permits. 21.21 Section... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.21 Import and export... must have a permit to import or export migratory birds, their parts, nests, or eggs. You must meet the...

  7. Qinshan CANDU project open top construction method

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Wittann, K.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The significant schedule reductions achieved on the Qinshan CANDU Project were due in large part to the incorporation of advanced construction technologies in project design and delivery. For the Qinshan Project, a number of key advantages were realized through the use of the 'Open Top' construction method. This paper discusses the Qinshan Phase III CANDU Project Open Top implementation method. The Open Top method allowed major equipment to be installed simply, via the use of a Very Heavy Lift (VHL) crane and permitted the use of large-scale modularization. The advantages of Open Top construction, such as simplified access, more flexible project scheduling, improved construction safety and quality, and reduced labours are presented. The large-scale modularization of the Reactor Building Dousing System and the Open Top installation method and advantages relative to traditional CANDU 6 construction practices are also presented. Finally, major improvements for future CANDU plant construction using the Open Top method are discussed. (author)

  8. COMPETITIVENESS OF THE INDONESIAN CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Agung Budiwibowo

    2009-06-01

    Full Text Available Indonesia’s construction industry is important to the national economy. However, its competitiveness is considered low due to the lack of success of its development strategy and policy. A new approach known as the cluster approach is being used to make strategy and policy in order to develop a stronger more competitive industry . This paper discusses the layout of the Indonesian construction cluster and its competitiveness. The archival analysis research approach was used to identify the construction cluster. The analysis was based on the I/O tables of the years 1995 and 2000, which were published by the Indonesian Central Bureau of Statistics. The results suggest that the Indonesian construction cluster consists of the industries directly involved in construction as the core, with the other related and supporting industries as the balance. The anatomy of the Indonesian construction cluster permits structural changes to happen within it. These changes depend on policies that regulate the cluster’s constituents.

  9. Hydropower : A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  10. Hydropower: A Regulatory Guide to Permitting and Licensing in Idaho, Montana, Oregon, and Washington.

    Energy Technology Data Exchange (ETDEWEB)

    McCoy, Gilbert A.

    1992-12-01

    The design, construction and operation of a hydropower project can result in many potential impacts. These potential impacts are of concern to a host of federal, state, and local authorities. Early consultation with land and water management, fish and wildlife resource protection, and health and human safety-oriented agencies should occur to determine specific concerns and study requirements for each proposed project. This Guide to Permitting and Licensing outlines the characteristic features of attractive hydropower sites; summarizes an array of developmental constraints; illustrates potential environmental impacts and concerns; and summarizes all federal, state, and local permitting and licensing requirements.

  11. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-27

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation`s energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization`s ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization`s commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans.

  12. Early Site Permit Demonstration Program: Recommendations for communication activities and public participation in the Early Site Permit Demonstration Program

    International Nuclear Information System (INIS)

    1993-01-01

    On October 24, 1992, President Bush signed into law the National Energy Policy Act of 1992. The bill is a sweeping, comprehensive overhaul of the Nation's energy laws, the first in more than a decade. Among other provisions, the National Energy Policy Act reforms the licensing process for new nuclear power plants by adopting a new approach developed by the US Nuclear Regulatory Commission (NRC) in 1989, and upheld in court in 1992. The NRC 10 CFR Part 52 rule is a three-step process that guarantees public participation at each step. The steps are: early site permit approval; standard design certifications; and, combined construction/operating licenses for nuclear power reactors. Licensing reform increases an organization's ability to respond to future baseload electricity generation needs with less financial risk for ratepayers and the organization. Costly delays can be avoided because design, safety and siting issues will be resolved before a company starts to build a plant. Specifically, early site permit approval allows for site suitability and acceptability issues to be addressed prior to an organization's commitment to build a plant. Responsibility for site-specific activities, including communications and public participation, rests with those organizations selected to try out early site approval. This plan has been prepared to assist those companies (referred to as sponsoring organizations) in planning their communications and public involvement programs. It provides research findings, information and recommendations to be used by organizations as a resource and starting point in developing their own plans

  13. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S.; Vesterdal, M. [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P. [Eltra I/S (Denmark); Grohnheit, P.E.; Nielsen, L. [RISOe (Denmark); Tinggaard Svendsen, G. [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  14. Tradable CO{sub 2} permits in Danish and European energy policy

    Energy Technology Data Exchange (ETDEWEB)

    Varming, S; Vesterdal, M [ELSAMPROJEKT A/S (Denmark); Boerre Eriksen, P [Eltra I/S (Denmark); Grohnheit, P E; Nielsen, L [RISOe (Denmark); Tinggaard Svendsen, G [Handelshoejskolen i Aarhus (Denmark)

    2000-08-01

    This report presents the results of the project 'Tradable CO{sub 2} permits in Danish and European energy policy'. The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operation between Elsamprojekt A/S (project manager), Risoe National Laboratory, Aarhus School of Business and I/S Eltra. The three major objectives of the project were: To identify and analyse the economical and political issues that are relevant with regard to the construction of a tradable CO{sub 2} permit market as well as proposing a suitable design for a tradable CO{sub 2} permit market for the energy sector in the EU. Experience from the tradable S{sub O}2 permit market in the US is taken into consideration as well. To present an overview of price estimates of CO{sub 2} and greenhouse gas permits in different models as well as discussing the assumptions leading to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices is analysed. To analyse the connection between CO{sub 2} permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat and power and renewables. In addition, the short-term effects on CO{sub 2} emissions and electricity trade of introducing tradable CO{sub 2} permit with limited coverage (i.e. a national system) as well as complete coverage (i.e. including all the countries) in the Nordic electricity system are analysed. (au)

  15. Language constructs for modular parallel programs

    Energy Technology Data Exchange (ETDEWEB)

    Foster, I.

    1996-03-01

    We describe programming language constructs that facilitate the application of modular design techniques in parallel programming. These constructs allow us to isolate resource management and processor scheduling decisions from the specification of individual modules, which can themselves encapsulate design decisions concerned with concurrence, communication, process mapping, and data distribution. This approach permits development of libraries of reusable parallel program components and the reuse of these components in different contexts. In particular, alternative mapping strategies can be explored without modifying other aspects of program logic. We describe how these constructs are incorporated in two practical parallel programming languages, PCN and Fortran M. Compilers have been developed for both languages, allowing experimentation in substantial applications.

  16. Should advertising by aesthetic surgeons be permitted?

    Directory of Open Access Journals (Sweden)

    Neeraj Nagpal

    2017-01-01

    Full Text Available Cosmetic, aesthetic and cutaneous surgical procedures require qualified specialists trained in the various procedures and competent to handle complications. However, it also requires huge investments in terms of infrastructure, trained staff and equipment. To be viable advertising is essential to any establishment which provides cosmetic and aesthetic procedures. Business men with deep pockets establish beauty chains which also provide these services and advertise heavily to sway public opinion in their favour. However, these saloons and spas lack basic medical facilities in terms of staff or equipment to handle any complication or medical emergency. To have a level playing field ethical advertising should be permitted to qualified aesthetic surgeons as is permitted in the US and UK by their respective organisations.

  17. Market Power in Laboratory Emission Permit Markets

    International Nuclear Information System (INIS)

    Godby, R.

    2002-01-01

    Many proposals suggesting the use of markets to control pollution assume markets will be competitive. When markets do not exhibit competitive characteristics, however, should they still be expected to result in efficiency improvement relative to traditional approaches? This paper employs experimental economic methods to examine the effect of market structure on the use of marketable emissions permits. Results indicate that in a market with one dominant firm and a number of fringe firms, strategic manipulation occurs repeatedly in the laboratory as predicted by market power models, undermining the allocative and dynamic efficiency benefits such markets offer. When firms compete in a downstream product market dominated by the same single firm, market efficiency can actually be reduced with the implementation of permit markets. Final market efficiencies reflect initial endowments and are influenced by competitive conditions elsewhere in the economy, indicating that policy-makers should carefully consider whether markets are appropriate in such circumstances

  18. Hanford Site air operating permit application

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ``regulated`` pollutants. Regulated pollutants include ``criteria`` pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ``Hazardous`` Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995.

  19. Hanford Site air operating permit application

    International Nuclear Information System (INIS)

    1995-05-01

    The Clean Air Act Amendments of 1990, which amended the Federal Clean Air Act of 1977, required that the US Environmental Protection Agency develop a national Air Operating Permit Program, which in turn would require each state to develop an Air Operating Permit Program to identify all sources of ''regulated'' pollutants. Regulated pollutants include ''criteria'' pollutants (oxides of nitrogen, sulfur oxides, total suspended particulates, carbon monoxide, particulate matter greater than 10 micron, lead) plus 189 other ''Hazardous'' Air Pollutants. The Hanford Site, owned by the US Government and operated by the US Department of Energy, Richland Operations Office, is located in southcentral Washington State and covers 560 square miles of semi-arid shrub and grasslands located just north of the confluence of the Snake and Yakima Rivers with the Columbia River. This land, with restricted public access, provides a buffer for the smaller areas historically used for the production of nuclear materials, waste storage, and waste disposal. About 6 percent of the land area has been disturbed and is actively used. The Hanford Site Air Operating Permit Application consists of more than 1,100 sources and in excess of 300 emission points. Before January 1995, the maintenance and operations contractor and the environmental restoration contractor for the US Department of Energy completed an air emission inventory on the Hanford Site. The inventory has been entered into a database so that the sources and emission points can be tracked and updated information readily can be retrieved. The Hanford Site Air Operating Permit Application contains information current as of April 19, 1995

  20. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) is an existing treatment, storage, and/or disposal (TSD) unit located in the 200 East Area and the adjacent 600 Area of the Hanford Site. The GTF mixes dry cementitious solids with liquid mixed waste (containing both dangerous and radioactive constituents) produced by Hanford Site operations. The GTF consists of the following: The 241-AP-02D and 241-AP-04D waste pump pits and transfer piping; Dry Materials Facility (DMF); Grout Disposal Facility (GDF), consisting of the disposal vault and support and monitoring equipment; and Grout Processing Facility (GPF) and Westinghouse Hanford Company on the draft Hanford Facility Dangerous Waste Permit and may not be read to conflict with those comments. The Grout Treatment Facility Dangerous Waste Permit Application consists of both a Part A and a Part B permit application. An explanation of the Part A revisions associated with this TSD unit, including the current revision, is provided at the beginning of the Part A section. The Part B consists of 15 chapters addressing the organization and content of the Part B checklist prepared by the Washington State Department of Ecology (Ecology 1987). For ease of reference, the checklist section numbers, in brackets, follow chapter headings and subheadings

  1. Permitting plan for project W-320 tank 241-C-106 waste retrieval sluicing system (WRSS)

    International Nuclear Information System (INIS)

    Symons, G.A.

    1997-01-01

    This document describes the permitting plan for Project W-320, Tank 241-C-106 Waste Retrieval Sluicing System (WRSS). A comprehensive review of environmental regulations have indicated that several environmental reviews [e.g. National Environmental Policy Act (NEPA), State Environmental Policy Act (SEPA)], permits, and approvals are required prior to construction or operation of the facility. The environmental reviews, permits and approvals, as well the regulatory authority, potentially applicable to the Tank 241-C-106 WRSS include the following: for NEPA - U.S. Department of Energy-Headquarters: Action Description Memorandum, Environmental Assessment, Categorical Exclusion, and Environmental Impact Statement; and for SEPA - State of Washington Department of Ecology (Ecology) Determination of Nonsignificance, Mitigated Determination of Nonsignificance, Determination of Significance, and SEPA Environmental Checklist

  2. First Commercial US Mixed Waste Vitrification Facility: Permits, Readiness Reviews, and Delisting of Final Wasteform

    International Nuclear Information System (INIS)

    Pickett, J.B.; Norford, S.W.; Diener, G.A.

    1998-01-01

    Westinghouse Savannah River Co. (WSRC) contracted GTS Duratek (Duratek) to construct and operate the first commercial vitrification facility to treat an F-006 mixed (radioactive/hazardous) waste in the United States. The permits were prepared and submitted to the South Carolina state regulators by WSRC - based on a detailed design by Duratek. Readiness Assessments were conducted by WSRC and Duratek at each major phase of the operation (sludge transfer, construction, cold and radioactive operations, and a major restart) and approved by the Savannah River Department of Energy prior to proceeding. WSRC prepared the first 'Upfront Delisting' petition for a vitrified mixed waste. Lessons learned with respect to the permit strategy, operational assessments, and delisting from this 'privatization' project will be discussed

  3. PERMITTING LEADERSHIP IN THE UNITED STATES

    International Nuclear Information System (INIS)

    Ken Nemeth

    2002-01-01

    In accordance with the Southern States Energy Board (SSEB) proposal, as incorporated into NETL/DE-FC26-97FT34199, the objective of this agreement is to streamline the environmental technology permitting process site-to-site, state-to-state, and industry-to-industry to achieve remediation and waste processing faster, better and cheaper. SSEB is working with member Governors, legislators and regulators to build consensus on streamlining the permitting process for new and innovative technologies for addressing the legacy of environmental problems from 50 years of weapons research, development and production. This report reviews mechanisms whereby industry consortiums and the Department of Energy (DOE) have been working with State regulators and other officials in technology deployment decisions within the DOE complex. The historic development of relationships with State regulators is reviewed and the current nature of the relationships examined. The report contains observations from internal DOE reviews as well as recommendations from the General Accounting Office (GAO) and other external organizations. The report discusses reorganization initiatives leading up to a DOE Top-to-Bottom review of the Environmental Management (EM) Program and highlights points of consideration for maintaining effective linkages with State regulators. It notes how the proposed changes will place new demands upon the National Energy Technology Laboratory (NETL) and how NETL can leverage its resources by refocusing existing EM efforts specifically to states that have DOE facilities within their borders (host-states). Finally, the report discusses how SSEB's Permitting Leadership in the United States (PLUS) program can provide the foundation for elements of NETL's technical assistance program that are delivered to regulators and other decision- makers in host-states. As a regional compact commission, SSEB provides important direct linkages to regulators and stakeholders who need technical

  4. Tradable permit allocations and sequential choice

    Energy Technology Data Exchange (ETDEWEB)

    MacKenzie, Ian A. [Centre for Economic Research, ETH Zuerich, Zurichbergstrasse 18, 8092 Zuerich (Switzerland)

    2011-01-15

    This paper investigates initial allocation choices in an international tradable pollution permit market. For two sovereign governments, we compare allocation choices that are either simultaneously or sequentially announced. We show sequential allocation announcements result in higher (lower) aggregate emissions when announcements are strategic substitutes (complements). Whether allocation announcements are strategic substitutes or complements depends on the relationship between the follower's damage function and governments' abatement costs. When the marginal damage function is relatively steep (flat), allocation announcements are strategic substitutes (complements). For quadratic abatement costs and damages, sequential announcements provide a higher level of aggregate emissions. (author)

  5. PSD Permit for the Marblehead Lime Company

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  6. Honda Permits to Install 1 Year Aggregation

    Science.gov (United States)

    This document may be of assistance in applying the New Source Review (NSR) air permitting regulations including the Prevention of Significant Deterioration (PSD) requirements. This document is part of the NSR Policy and Guidance Database. Some documents in the database are a scanned or retyped version of a paper photocopy of the original. Although we have taken considerable effort to quality assure the documents, some may contain typographical errors. Contact the office that issued the document if you need a copy of the original.

  7. The CO{sub 2} emission permits market simulation using Continuous Double Auction

    Energy Technology Data Exchange (ETDEWEB)

    Bartoszczuk, Pawel [Warsaw School of Economics (Poland); Stanczak, Jaroslaw

    2016-07-01

    In this paper we consider the buying and selling prices of carbon dioxide (CO{sub 2}) emission permits in trading models with uncertainty. Permission prices, although usually omitted from standard models, may significantly influence the trading market. We thus construct a more realistic trade model. To do this, we introduced several important changes to the standard model, mainly we added The Continuous Double Action.

  8. Permitting a biomass-fired power plant in California -- A case study

    International Nuclear Information System (INIS)

    Reisman, J.I.; Needham, G.A.

    1995-01-01

    This paper describes the process of preparing an air permit application for a proposed biomass-fired power plant. The plant is designed to produce a net electric power output of 16 megawatts (MW) for sale to Pacific Gas and Electric Company. The biomass fuel will consist of urban wood waste, construction wood waste, and waste from agricultural products, such as tree prunings and fruit pits. The site is located in an industrial park in Soledad, California

  9. 75 FR 27814 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-05-18

    ... permit to export one female captive bred giant panda (Ailuropoda melanoleuca) born at the zoo in 2005 and... education. The permit numbers and animals are: 070854, Bimbo Jr.; 079868, Vickie; 079870, Jenny; 079871...

  10. A Framework for Building Efficient Environmental Permitting Processes

    Directory of Open Access Journals (Sweden)

    Nicola Ulibarri

    2017-01-01

    Full Text Available Despite its importance as a tool for protecting air and water quality, and for mitigating impacts to protected species and ecosystems, the environmental permitting process is widely recognized to be inefficient and marked by delays. This article draws on a literature review and interviews with permitting practitioners to identify factors that contribute to delayed permit decisions. The sociopolitical context, projects that are complex or use novel technology, a fragmented and bureaucratic regulatory regime, serial permit applications and reviews, and applicant and permitting agency knowledge and resources each contribute to permitting inefficiency when they foster uncertainty, increase transaction costs, and allow divergent interests to multiply, yet remain unresolved. We then use the interviews to consider the potential of a collaborative dialogue between permitting agencies and applicants to mitigate these challenges, and argue that collaboration is well positioned to lessen permitting inefficiency.

  11. 34 CFR 395.35 - Terms of permit.

    Science.gov (United States)

    2010-07-01

    ..., periodicals, publications, confections, tobacco products, foods, beverages, chances for any lottery authorized... PROPERTY Federal Property Management § 395.35 Terms of permit. Every permit shall describe the location of...

  12. 78 FR 27249 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-05-09

    ... purpose of enhancing the species' survival. Permit No. TE-99477A Applicant: Benjamin S. Wallace, Fairfield...-99473A Applicant: Joseph D. Henry, San Diego, California The applicant requests a permit to take (capture...

  13. 76 FR 75897 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-12-05

    ...: EA Engineering, Science, and Technology, Lewisville, Texas. Applicant requests a new permit for... atricapilla) within Texas. Permit TE-37047A Applicant: Sea World Parks and Entertainment, San Antonio, Texas...

  14. 76 FR 35235 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-06-16

    ... chub (Gila intermedia), Gila topminnow (Poeciliopsis occidentalis occidentalis), humpback chub (Gila... intermedia) within Arizona. Permit TE-43777A Applicant: Sea Life US, LLC, Grapevine, Texas. Applicant...), and Gila chub (Gila intermedia) within Arizona. Permit TE-118414 Applicant: Cherokee Nation, Tahlequah...

  15. Storm water permitting for oil and gas facilities

    International Nuclear Information System (INIS)

    de Blanc, P.C.

    1991-01-01

    After several false starts, the US Environmental Protection Agency (EPA) published new federal storm water regulations in the November 16, 1990 Federal Register. These regulations identify facilities which must apply for a storm water permit and detail permit application requirements. The regulations appear at 40 CFR 122 Subpart B and became effective December 17, 1990. An outline of these regulations and their applicability to oil and gas facilities is presented. They are: facilities which require a storm water permit; types of storm water permits; permit application deadlines; permit application forms; facilities with existing storm water permits; storm water permit application data requirements; storm water sampling and analysis requirements; and EPA contacts for additional information

  16. Remediation General Permit (RGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the National Pollutant Discharge Elimination System (NPDES) General Permit for Remediation Activity Discharges – the Remediation General Permit in MA (MAG910000) and NH (NHG910000).

  17. The Use of Transferable Permits in Transport Policy

    OpenAIRE

    Raux, Charles

    2004-01-01

    http://dx.doi.org/10.1016/j.trd.2004.01.001; International audience; This paper considers potential use of domestic transferable, or tradable, permit systems for the purposes of travel management, especially reducing environmental nuisances. The main arguments for and against the use of permits are analyzed. Secondly two case studies of existing permit systems are examined. The main conclusions are that tradable permits can address greenhouse gas and regional atmospheric pollutant emissions, ...

  18. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations

  19. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 appendices covering engineering drawings and operating procedures

  20. Are LMFBR permits unconstitutional. [German Feferal Republic

    Energy Technology Data Exchange (ETDEWEB)

    Wagner, H; Ziegler, E

    1977-12-01

    The August 18, 1977 decision by the Muenster Higher Administrative Court to have the Federal Constitutional Court investigate the constitutionality of permits granted for fast breeder power plants has aroused much attention, both in the FRG and in other countries. This is the first time that the German Atomic Energy Act is being questioned with respect to the separation of powers between legislative and executive authorities and also with respect to the principle of a constitutional state. As a result of their analysis of the first information available about the court decision the authors have some doubts as to whether the views held by the court about the consequences of the development of fast breeder reactors and of the permit granted for the SNR 300 demonstration nuclear power station are essentially correct. In view of the wording of and the official comments on the incriminated Section 7 of the Atomic Energy Act and the large number of subsequent leading decisions by the Federal Diet about fast breeder reactors also the concern about the constitutionality of that reactor line appears to be unfounded.

  1. The run permit protection system for GTA

    International Nuclear Information System (INIS)

    Atkins, W.H.; Jones, R.G.

    1992-01-01

    A Run Permit system has been designed for the Ground Test Accelerator (GTA). The system implements mode-dependent software interlocks to ensure proper operation of the accelerator, enabling the ion source extractor and RF systems when proper conditions are met. The system is implemented using the GTA control system; thus all information available to the control system is also available for use in interlock logic. The logic is defined in terms of control system channels, which reflect accelerator parameters such as actuator positions, power supply values, temperatures, etc. A mode switch in the control room selects the accelerator operating mode, for example i njector only . The Run Permit software selects interlock logic as appropriate operating mode. This implementation easily accommodates logic changes as requirements evolve. To ensure reliable operation of a software-based system, a special circuit with a watch-dog timer is employed to produce the system's output signals. The software must periodically address the circuit, or the output signals are forced to a disabled state. For additional protection, there are self-test provisions for detecting and reacting to failures of the control system. (Author) 4 figs., ref

  2. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid mixed wastes (containing both dangerous and radioactive constitutents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 2 Appendices covering engineering drawings and operating procedures

  3. Grout Treatment Facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1988-01-01

    This section briefly describes the Hanford Site, provides a general description of the site operations and administration, provides an overview of the contents of this Grout Treatment Facility (GTF) Permit Application, and gives a list of acronyms and abbreviations used in the document. The decision was made to use the checklist as a locator reference instead of using the checklist section numbers as paragraph section numbers because several different types of waste management units, some of which are not addressed in the checklists, are part of the GTF. The GTF is a waste management unit within the Hanford Site facility. In May 1988, a permit application was filed that identified the GTF as an existing facility. The GTF mixes dry cementitious solids with liquid wastes (containing both dangerous and radioactive constituents) produced by Hanford Site operations. In addition to the design and operating features of the GTF that are intended to meet the requirements of dangerous waste regulations, many additional design and operating features are necessary to comply with radioactive waste management practices. The GTF design features and practices are intended to keep operational exposure to radionuclides and dangerous substances ''as low as reasonably achievable'' (ALARA) and to provide a disposal system that protects the environment for at least 10,000 yr. In some instances, ALARA practices present difficulties when complying with requirements of dangerous waste regulations. This volume contains 14 Appendices. Topics include Engineering Drawings, Maps, Roads, Toxicity Testing, and Pilot-Scale Testing

  4. A construction process model for implementing constructability in construction

    NARCIS (Netherlands)

    Langkemper, J.; Al-Jibouri, S.; Reymen, I.M.M.J.; Maas, G.J.; Gassel, van F.

    2003-01-01

    In construction, failure of design professionals to consider how a builder will implement the design can result in scheduling problems, cost escalation, delays and disputes during the construction process. The integration of construction knowledge and experience during planning and design is termed

  5. 76 FR 67650 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-11-02

    ... and suggestions on migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or... for a specific permit authorizing the use of raptors in abatement activities (76 FR 39368). The...

  6. 75 FR 20622 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    .... Permit No. TE-02997A Applicant: University of Hawaii, Hilo, Hawaii. The applicant requests a permit to... scientific research including genetic, morphological and behavioral research on the island of Hawaii in the State of Hawaii for the purpose of enhancing its survival. The applicant also requests a permit to take...

  7. 25 CFR 211.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 211.56 Section 211.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations and Appeals § 211.56 Geological and geophysical permits. Permits to conduct geological and geophysical operations on Indian lands which do not...

  8. 25 CFR 212.56 - Geological and geophysical permits.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Geological and geophysical permits. 212.56 Section 212.56... FOR MINERAL DEVELOPMENT Rents, Royalties, Cancellations, and Appeals § 212.56 Geological and geophysical permits. (a) Permits to conduct geological and geophysical operations on Indian lands which do not...

  9. 40 CFR 270.65 - Research, development, and demonstration permits.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Research, development, and... Special Forms of Permits § 270.65 Research, development, and demonstration permits. (a) The Administrator may issue a research, development, and demonstration permit for any hazardous waste treatment facility...

  10. 40 CFR 52.2184 - Operating permits for minor sources.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 4 2010-07-01 2010-07-01 false Operating permits for minor sources. 52... permits for minor sources. Emission limitations and related provisions established in South Dakota minor... right to deem permit conditions not federally enforceable. Such a determination will be made according...

  11. 77 FR 34061 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2012-06-08

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  12. 78 FR 27255 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-05-09

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  13. 78 FR 56922 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-16

    ...-FF09A30000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... following permits to conduct certain activities with endangered species. We issue these permits under the Endangered Species Act (ESA). ADDRESSES: Brenda Tapia, Division of Management Authority, U.S. Fish and...

  14. 76 FR 40338 - Marine Mammals; Photography Permit No. 16360

    Science.gov (United States)

    2011-07-08

    ... Mammals; Photography Permit No. 16360 AGENCY: National Marine Fisheries Service (NMFS), National Oceanic... photography of cetaceans off Hawaii. ADDRESSES: The permit and related documents are available for review upon... photography on 12 cetacean species had been submitted by the above-named applicant. The requested permit has...

  15. 78 FR 24305 - Actions on Special Permit Applications

    Science.gov (United States)

    2013-04-24

    ... special permit Lincoln, NE. to authorize an alternative fire protection system. 11624-M Clean Harbors 49... Special Permit Applications AGENCY: Pipeline and Hazardous Materials Safety Administration (PHMSA), DOT. ACTION: Notice of actions on Special Permit Applications. SUMMARY: In accordance with the procedures...

  16. 40 CFR 96.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.323 Section 96.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... the permitting authority, as necessary to facilitate coordination of the renewal of the CAIR permit...

  17. 21 CFR 1312.23 - Issuance of export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Issuance of export permit. 1312.23 Section 1312.23... CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.23 Issuance of export permit. (a) The... regulation in § 1312.30 of this part be exported only pursuant to the issuance of an export permit. The...

  18. 50 CFR 20.64 - Foreign export permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false Foreign export permits. 20.64 Section 20... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD HUNTING Importations § 20.64 Foreign export permits. No... such birds are accompanied by export permits, tags, or other documentation required by applicable...

  19. 21 CFR 1312.22 - Application for export permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 9 2010-04-01 2010-04-01 false Application for export permit. 1312.22 Section... EXPORTATION OF CONTROLLED SUBSTANCES Exportation of Controlled Substances § 1312.22 Application for export permit. (a) An application for a permit to export controlled substances shall be made on DEA Form 161...

  20. 75 FR 47583 - Application to Rescind Presidential Permit; Joint Application for Presidential Permit; British...

    Science.gov (United States)

    2010-08-06

    ... Presidential Permit No. PP-22, as amended, to BC Hydro. The application requested that the Department of Energy... the transmission of electric energy between the United States and a foreign country is prohibited in... law pursuant to British Columbia's Clean Energy Act. Since restructuring of the electric power...

  1. 75 FR 8070 - Closed Auction of Broadcast Construction Permits Scheduled for July 20, 2010; Auction 88...

    Science.gov (United States)

    2010-02-23

    ... to support their claims with valuation analyses and suggested amounts or formulas for reserve prices... seek comment on factors that could reasonably have an impact on valuation of the broadcast spectrum..., Inc. Arkansas Valley Broadcasting, LLC BBK Broadcasting Big Sky Company Birach Broadcasting...

  2. 77 FR 34897 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit to Construct...

    Science.gov (United States)

    2012-06-12

    ... www.regulations.gov or email. The www.regulations.gov Web site is an ``anonymous access'' system... is placed in the public docket and made available on the Internet. If you submit an electronic... placed on the Internet and will be publicly available only in hard copy form. Publicly available docket...

  3. 77 FR 28543 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Science.gov (United States)

    2012-05-15

    ... www.regulations.gov or email. The www.regulations.gov Web site is an ``anonymous access'' system... the public docket and made available on the Internet. If you submit an electronic comment, EPA... Internet and will be publicly available only in hard copy form. Publicly available docket materials are...

  4. 77 FR 28491 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Science.gov (United States)

    2012-05-15

    ... email. The www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will not know... the Environment (MDE) submitted a formal revision ( 03-11) to its State Implementation Plan (SIP). The... exemption from other applicable air pollution requirements. No such relief exists in MDE's regulations. Fuel...

  5. 77 FR 34808 - Approval and Promulgation of Air Quality Implementation Plans; Maryland; Permit To Construct...

    Science.gov (United States)

    2012-06-12

    ... email. The www.regulations.gov Web site is an ``anonymous access'' system, which means EPA will not know... the Environment (MDE) submitted a formal revision ( 11-07) to its State Implementation Plan (SIP). The....'' The revisions to COMAR 26.11.02.10X were effective in Maryland on August 11, 2011. The MDE submitted...

  6. 78 FR 54813 - Approval and Promulgation of Air Quality Implementation Plans; Colorado; Construction Permit...

    Science.gov (United States)

    2013-09-06

    ... to Regulation 3, Part A, Section VI.D.1., in which the State, among other things, increased the... material, will be publicly available only in hard copy. Publicly available docket materials are available either electronically in www.regulations.gov or in hard copy at the Air Program, Environmental Protection...

  7. 75 FR 74719 - Auction of VHF Commercial Television Station Construction Permits Scheduled for February 15, 2011...

    Science.gov (United States)

    2010-12-01

    ... attributable interest in the applicant, in other media of mass communications are considered when determining... in media of mass communications, may cause diminishment or loss of the bidding credit, and must be... Credit. A medium of mass communications is defined in 47 CFR 73.5008(b). Full service noncommercial...

  8. 75 FR 34516 - Issuance of an Amended Presidential Permit Authorizing the Construction, Operation, and...

    Science.gov (United States)

    2010-06-17

    ... Mexican Affairs--Room 3909, Department of State, 2201 C St., NW., Washington, DC 20520. Information about... Secretary's delegate, the United States shall have the right to enter upon and take possession of any of the... control to the permittee. In the event that the United States shall exercise such right, it shall pay to...

  9. 75 FR 48408 - Issuance of a Presidential Permit Authorizing the Construction, Operation, and Maintenance of the...

    Science.gov (United States)

    2010-08-10

    ... mail at Office of Mexican Affairs--Room 3909, Department of State, 2201 C St., NW., Washington, DC... Secretary's delegate, the United States shall have the right to enter upon and take possession of any of the... control to the permittee. In the event that the United States shall exercise such right, it shall pay to...

  10. 75 FR 68821 - Endangered and Threatened Wildlife and Plants; Permit; Construction and Operation of Kaheawa II...

    Science.gov (United States)

    2010-11-09

    .... DATES: All comments from interested parties must be received on or before December 9, 2010. ADDRESSES... under the Service's ``No Surprises'' regulations at 50 CFR 17.32(b)(5) and 50 CFR 17.22(b)(5). KWP II is... implementation. We invite comments and suggestions from all interested parties and request that comments be as...

  11. 21 CFR 108.12 - Manufacturing, processing, or packing without a permit, or in violation of a permit.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 2 2010-04-01 2010-04-01 false Manufacturing, processing, or packing without a permit, or in violation of a permit. 108.12 Section 108.12 Food and Drugs FOOD AND DRUG ADMINISTRATION... General Provisions § 108.12 Manufacturing, processing, or packing without a permit, or in violation of a...

  12. Requirements for permitting a mixed waste incinerator

    International Nuclear Information System (INIS)

    Trichon, M.; Feldman, J.; Serne, J.C.

    1990-01-01

    The consideration, design, selection and operation of any incinerator depends primarily on characteristic quality (ultimate and proximate analyses) and quantity to the waste to be incinerated. In the case of burning any combination of mixed hazardous, biomedical and radioactive low level waste, specific federal and generic state environmental regulatory requirements are outlined. Combustion chamber temperature and waste residence time requirements will provide the rest of the envelope for consideration. Performance requirements must be balanced between the effects of time and temperature on destruction of the organic waste and the vaporization and possible emission of the inorganic waste components (e.g., toxic metals, radioactive inorganics) as operating conditions and emission levels will be set in state and federal regulatory permits. To this end the complete characterization of the subject waste stream must be determined if an accurate assessment of incineration effectiveness and impact are to be performed

  13. Hanford Site Solid Waste Landfill permit application

    International Nuclear Information System (INIS)

    1991-01-01

    Daily activities at the Hanford Site generate sanitary solid waste (nonhazardous and nonradioactive) that is transported to and permanently disposed of at the Hanford Site Solid Waste Landfill. This permit application describes the manner in which the solid Waste Landfill will be operated under Washington State Department of Ecology Minimum Functional Standards for Solid Waste Handling, Washington Administrative Code 173-304. The solid Waste Landfill is owned by the US Department of Energy -- Richland Operations Office and is used for disposal of solid waste generated at the US Department of Energy Hanford Site. The jurisdictional health department's permit application form for the Solid Waste Landfill is provided in Chapter 1.0. Chapter 2.0 provides a description of the Hanford Site and the Solid Waste Landfill and reviews applicable locational, general facility, and landfilling standards. Chapter 3.0 discusses the characteristics and quantity of the waste disposed of in the Solid Waste Landfill. Chapter 4.0 reviews the regional and site geology and hydrology and the groundwater and vadose zone quality beneath the landfill. Chapters 5.0, 6.0, and 7.0 contain the plan of operation, closure plan, and postclosure plan, respectively. The plan of operation describes the routine operation and maintenance of the Solid Waste Landfill, the environmental monitoring program, and the safety and emergency plans. Chapter 5.0 also addresses the operational cover, environmental controls, personnel requirements, inspections, recordkeeping, reporting, and site security. The postclosure plan describes requirements for final cover maintenance and environmental monitoring equipment following final closure. Chapter 8.0 discusses the integration of closure and postclosure activities between the Solid Waste Landfill and adjacent Nonradioactive Dangerous Waste Landfill. 76 refs., 48 figs, 15 tabs

  14. Constructing Aligned Assessments Using Automated Test Construction

    Science.gov (United States)

    Porter, Andrew; Polikoff, Morgan S.; Barghaus, Katherine M.; Yang, Rui

    2013-01-01

    We describe an innovative automated test construction algorithm for building aligned achievement tests. By incorporating the algorithm into the test construction process, along with other test construction procedures for building reliable and unbiased assessments, the result is much more valid tests than result from current test construction…

  15. Permitting plan for the immobilized low-activity waste project

    International Nuclear Information System (INIS)

    Deffenbaugh, M.L.

    1997-01-01

    This document addresses the environmental permitting requirements for the transportation and interim storage of the Immobilized Low-Activity Waste (ILAW) produced during Phase 1 of the Hanford Site privatization effort. Tri-Party Agreement (TPA) Milestone M-90 establishes a new major milestone, and associated interim milestones and target dates, governing acquisition and/or modification of facilities necessary for: (1) interim storage and disposal of Tank Waste Remediation Systems (TWRS) immobilized low-activity tank waste (ILAW) and (2) interim storage of TWRS immobilized HLW (IHLW) and other canistered high-level waste forms. Low-activity waste (LAW), low-level waste (LLW), and high-level waste (HLW) are defined by the TWRS, Hanford Site, Richland, Washington, Final Environmental Impact Statement (EIS) DOE/EIS-0189, August 1996 (TWRS, Final EIS). By definition, HLW requires permanent isolation in a deep geologic repository. Also by definition, LAW is ''the waste that remains after separating from high-level waste as much of the radioactivity as is practicable that when solidified may be disposed of as LLW in a near-surface facility according to the NRC regulations.'' It is planned to store/dispose of (ILAW) inside four empty vaults of the five that were originally constructed for the Group Program. Additional disposal facilities will be constructed to accommodate immobilized LLW packages produced after the Grout Vaults are filled. The specifications for performance of the low-activity vitrified waste form have been established with strong consideration of risk to the public. The specifications for glass waste form performance are being closely coordinated with analysis of risk. RL has pursued discussions with the NRC for a determination of the classification of the Hanford Site's low-activity tank waste fraction. There is no known RL action to change law with respect to onsite disposal of waste

  16. Perspectives of construction robots

    Science.gov (United States)

    Stepanov, M. A.; Gridchin, A. M.

    2018-03-01

    This article is an overview of construction robots features, based on formulating the list of requirements for different types of construction robots in relation to different types of construction works.. It describes a variety of construction works and ways to construct new or to adapt existing robot designs for a construction process. Also, it shows the prospects of AI-controlled machines, implementation of automated control systems and networks on construction sites. In the end, different ways to develop and improve, including ecological aspect, the construction process through the wide robotization, creating of data communication networks and, in perspective, establishing of fully AI-controlled construction complex are formulated.

  17. Construction completion report

    International Nuclear Information System (INIS)

    1990-01-01

    This Construction Completion Report documents the major construction projects at the Waste Isolation Pilot Plant (WIPP) site and related information on contracts, schedules, and other areas which affected construction. This report is not intended to be an exhaustive detailed analysis of construction, but is a general overview and summary of the WIPP construction. 10 refs., 29 figs

  18. Coping with EPA's new petroleum industry storm water permits

    International Nuclear Information System (INIS)

    Veal, S.C.; Whitescarver, J.P.

    1994-01-01

    The United States Environmental Protection Agency has just released for public comment its so-called multi-sector industry specific storm water permit. This permit -- developed in response to the 730 group storm water permit applications submitted in 1992 to EPA -- proposes the establishment of specific runoff sampling and facility design requirements for at least two petroleum industry sectors. This proposed permit establishes specific conditions for the oil and gas extraction section (SIC group 13) and for lubricant manufacturers (SIC 2992). Permit conditions are also established for allied industrial sectors such as the chemical, transportation and asphalt materials industries. By most standards, the proposed permit is much tougher than EPA's baseline general permit for storm water discharges which was released in September of 1992. For example, under the proposal, most industries are required to perform periodic storm water sampling. EPA has also established storm water effluent and performance standards for several industrial categories. This paper will discuss the petroleum industry specific conditions of the new permit. The paper will also discuss the results of the industry-wide storm water sampling efforts undertaken by more than 300 oil patch facilities across the country. In particular, sampling results will be discussed in the context to the permit conditions proposed by EPA. The paper will also discuss strategies for dealing with the new permits

  19. Concrete construction engineering handbook

    CERN Document Server

    Nawy, Edward G

    2008-01-01

    Provides coverage of concrete construction engineering and technology. This work features discussions focusing on: the advances in engineered concrete materials; reinforced concrete construction; specialized construction techniques; and, design recommendations for high performance.

  20. Watershed-based point sources permitting strategy and dynamic permit-trading analysis.

    Science.gov (United States)

    Ning, Shu-Kuang; Chang, Ni-Bin

    2007-09-01

    Permit-trading policy in a total maximum daily load (TMDL) program may provide an additional avenue to produce environmental benefit, which closely approximates what would be achieved through a command and control approach, with relatively lower costs. One of the important considerations that might affect the effective trading mechanism is to determine the dynamic transaction prices and trading ratios in response to seasonal changes of assimilative capacity in the river. Advanced studies associated with multi-temporal spatially varied trading ratios among point sources to manage water pollution hold considerable potential for industries and policy makers alike. This paper aims to present an integrated simulation and optimization analysis for generating spatially varied trading ratios and evaluating seasonal transaction prices accordingly. It is designed to configure a permit-trading structure basin-wide and provide decision makers with a wealth of cost-effective, technology-oriented, risk-informed, and community-based management strategies. The case study, seamlessly integrating a QUAL2E simulation model with an optimal waste load allocation (WLA) scheme in a designated TMDL study area, helps understand the complexity of varying environmental resources values over space and time. The pollutants of concern in this region, which are eligible for trading, mainly include both biochemical oxygen demand (BOD) and ammonia-nitrogen (NH3-N). The problem solution, as a consequence, suggests an array of waste load reduction targets in a well-defined WLA scheme and exhibits a dynamic permit-trading framework among different sub-watersheds in the study area. Research findings gained in this paper may extend to any transferable dynamic-discharge permit (TDDP) program worldwide.

  1. Licensing for the construction of 'Almirante Alvaro Alberto' nuclear power plant

    International Nuclear Information System (INIS)

    1974-09-01

    The BRAZILIAN NUCLEAR ENERGIA COMMISSION (Comissao Nacional de Energia Nuclear - CNEN) presents in Report n 0 51 of its Reactors Department all the requirements for the construction permit of 'Almirante Alvaro Alberto' Nuclear Power Plant [pt

  2. Long-term Stabilization of Disturbed Slopes Resulting from Construction Operations

    Science.gov (United States)

    2018-01-01

    Highway construction disturbs soil, which must be stabilized to prevent migration of soil particles into water bodies. Stabilization is enforced by law, regulation, and a permit system. Stabilization is most efficiently attained by reestablishment of...

  3. Flexible metabolic pathway construction using modular and divisible selection gene regulators

    DEFF Research Database (Denmark)

    Rugbjerg, Peter; Myling-Petersen, Nils; Sommer, Morten Otto Alexander

    2015-01-01

    Genetic selections are important to biological engineering. Although selectable traits are limited,currently each trait only permits simultaneous introduction of a single DNA fragment. Complex pathwayand strain construction however depends on rapid, combinatorial introduction of many genes thaten...

  4. Conference report : PERM-IT '97

    International Nuclear Information System (INIS)

    Smyth, V.; Yeabsley, A.

    1997-01-01

    The PERM-IT conference (Physics Engineering Radiation Medicine with a special emphasis on Information Technology) which was held in Adelaide with an attendance of about 250, was the joint annual meeting of the Australasian Radiation Protection Society, the Australasian College of Physical Scientists and Engineers in Medicine, the College of Biomedical Engineers of the Institution of Engineers Australia and the Society for Medical and Biological Engineering. The program was organised with three parallel sessions running most of the time, with plenary sessions for items of particular interest featuring keynote speakers from around the world. Attendance at this conference allowed the opportunity to meet with colleagues in other regulatory agencies, and Australia has a number of these. But what should be done about radioactive waste? A universal groan is raised by radiation protection regulatory authority staff at this question. Plans are afoot to develop a whole of Australia radioactive waste repository with both burial and above ground facilities. An announcement on the suitability of various sites in order of preference is expected, but in the meantime, facilities are fragemented. Discussions were held with staff from the radiation standards section of the Australian Radiation Laboratory who face similar problems to NRL including reducing funding, the move to cost recovery, and working towards quality managment accreditation. Plans for a further intercomparison between the Australian and NZ primary standards are being made. (author)

  5. PUREX Storage Tunnels dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-12-01

    The PUREX Storage Tunnels are a mixed waste storage unit consisting of two underground railroad tunnels: Tunnel Number 1 designated 218-E-14 and Tunnel Number 2 designated 218-E-15. The two tunnels are connected by rail to the PUREX Plant and combine to provide storage space for 48 railroad cars (railcars). The PUREX Storage Tunnels provide a long-term storage location for equipment removed from the PUREX Plant. Transfers into the PUREX Storage Tunnels are made on an as-needed basis. Radioactively contaminated equipment is loaded on railcars and remotely transferred by rail into the PUREX Storage Tunnels. Railcars act as both a transport means and a storage platform for equipment placed into the tunnels. This report consists of part A and part B. Part A reports on amounts and locations of the mixed water. Part B permit application consists of the following: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report

  6. Moral concerns on tradable pollution permits in international environmental agreements

    Energy Technology Data Exchange (ETDEWEB)

    Eyckmans, Johan [Hogeschool-Universiteit Brussel - HUB, Stormstraat 2, B-1000 Brussels (Belgium); Katholieke Universiteit Leuven, Centrum voor Economische Studien Naamsestraat 69, 3000 Leuven (Belgium); Kverndokk, Snorre [Ragnar Frisch Centre for Economic Research, Gaustadalleen 21, 0349 Oslo (Norway)

    2010-07-15

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  7. Tradable CO2 permits in Danish and European energy policy

    DEFF Research Database (Denmark)

    Varming, S.; Eriksen, P.B.; Grohnheit, Poul Erik

    2000-01-01

    This report presents the results of the project "Tradable CO2 permits in Danish and European energy policy". The project was financed by a grant from the Danish Energy Research Programme 1998 (Grant 1753/98-0002). The project was conducted in co-operationbetween Elsamprojekt A/S (project manager...... for a tradable CO_2 permit market for the energy sector in the EU. Experience from the tradable SO_2 permit market in the US is taken into consideration as well. Topresent an overview of price estimates of CO_2 and greenhouse gas permits in different models as well as discussing the assumptions leading...... to the different outcomes. Furthermore, the special role of backstop technologies in relation to permit prices isanalysed. To analyse the connection between CO_2 permit prices and technology choice in the energy sector in the medium and longer term (i.e., 2010 and 2020) with a special emphasis on combined heat...

  8. Marketable pollution permits with uncertainty and transaction costs

    International Nuclear Information System (INIS)

    Montero, Juan-Pablo

    1998-01-01

    Increasing interest in the use of marketable permits for pollution control has become evident in recent years. Concern regarding their performance still remains because empirical evidence has shown transaction costs and uncertainty to be significant in past and existing marketable permits programs. In this paper we develop theoretical and numerical models that include transaction costs and uncertainty (in trade approval) to show their effects on market performance (i.e., equilibrium price of permits and trading volume) and aggregate control costs. We also show that in the presence of transaction costs and uncertainty the initial allocation of permits may not be neutral in terms of efficiency. Furthermore, using a numerical model for a hypothetical NO x trading program in which participants have discrete control technology choices, we find that aggregate control costs and the equilibrium price of permits are sensitive to the initial allocation of permits, even for constant marginal transaction costs and certainty

  9. Moral concerns on tradable pollution permits in international environmental agreements

    International Nuclear Information System (INIS)

    Eyckmans, Johan; Kverndokk, Snorre

    2010-01-01

    We investigate how moral concerns about permit trading affect an endogenous pollution permit trading equilibrium, where governments choose non-cooperatively the amount of permits they allocate to domestic industries. Politicians may feel reluctant to allow permit trading and/or may prefer that abatement is undertaken domestically because of moral concerns. This will have an effect on the initial permit allocations, and, therefore, on global emissions. The impact on global emissions depends on the precise formulation of the moral concerns, but under reasonable assumptions, we show that global emissions may increase. Thus, doing what is perceived as good does not always yield the desired outcome. However, this can be offset by restrictions on permit trading when governments have moral concerns about this trade. (author)

  10. Issues in third party attacks on SMCRA permits. [USA - Indiana

    Energy Technology Data Exchange (ETDEWEB)

    Kelley, G.D. Jr. (Ice Miller Donadio Ryan, Indianapolis, IN (USA))

    1990-01-01

    Legal issues which have occurred in third party attacks on SMCRA (Surface Mining Control and Reclamation Act) permit, mainly in Indiana, are discussed. Problems that can occur with the interrelationship of common law nuisance/injunction actions, the permit process, enforcement proceedings and collateral estoppel from administrative agency action, as well as finality issues in the permit process as related to other provisions of SMCRA. 37 refs.

  11. Liquid effluent retention facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This appendix to the Liquid Effluent Retention Facility Dangerous Waste Permit Application contains pumps, piping, leak detection systems, geomembranes, leachate collection systems, earthworks and floating cover systems

  12. Proposed Issuance of NPDES Permit for NTUA Kayenta WWTF

    Science.gov (United States)

    Public Notice of proposed Issuance of National Pollutant Discharge Elimination System Permit (NPDES No. NN0020281) for Navajo Tribal Utility Authority (“NTUA”) Kayenta Wastewater Treatment Facility.

  13. Tradeable emission permits in Dutch environmental policy. A utopia?

    International Nuclear Information System (INIS)

    Schuurman, S.J.

    1997-01-01

    Because of the lack of experience with permits in the Netherlands, and in view of the similarities between various other tradeable permit systems, the functioning of Dutch systems of tradeable fish, milk and manure quotas is discussed. Evaluation of these systems is based on criteria of effectiveness, target-group efficiency and government efficiency. These systems of tradeable permits appear to constitute a successful addition to the Dutch policy of direct regulation. Considering this, and the favorable American experience with the Emissions Trading Program, tradeable emission permits deserve a chance to be implemented in Dutch environmental policy. The question remains, however, whether the Dutch government is ready for such a step. 28 refs

  14. 75 FR 66123 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-10-27

    ... enhancing their survival. Permit No. TE-24582A Applicant: Russell C. Croel, Folsom, California. The..., Contra Costa, Fresno, Glenn, Kings, Merced, Placer, Sacramento, San Joaquin, Shasta, Solano, Stanislaus...

  15. 78 FR 9067 - Receipt of Applications for Endangered Species Permits

    Science.gov (United States)

    2013-02-07

    ... County, Alabama. Permit Application Number: TE-91366A Applicant: Dr. Paul Stewart, Troy, Alabama...: TE-91373A Applicant: Jonathan Miller, Troy, Alabama. Applicant requests authorization to take...

  16. Guide to Permitting Hydrogen Motor Fuel Dispensing Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Rivkin, Carl [National Renewable Energy Lab. (NREL), Golden, CO (United States); Buttner, William [National Renewable Energy Lab. (NREL), Golden, CO (United States); Burgess, Robert [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-03-28

    The purpose of this guide is to assist project developers, permitting officials, code enforcement officials, and other parties involved in developing permit applications and approving the implementation of hydrogen motor fuel dispensing facilities. The guide facilitates the identification of the elements to be addressed in the permitting of a project as it progresses through the approval process; the specific requirements associated with those elements; and the applicable (or potentially applicable) codes and standards by which to determine whether the specific requirements have been met. The guide attempts to identify all applicable codes and standards relevant to the permitting requirements.

  17. 'Blocked area' of a citizens' action group in operating plan permit accoding to Mining Law

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-26

    On the question as to whether a citizen's action group, organized in the form of a registered club, has the right to file suit as defined by paragraph 2 of sect. 42 of the rules of administrative courts, in case they bring forward that their right to the reforestation of an estate, ensured by easement, will be affected by a skeleton operating plan permit issued under the mining law. Since the protection of the recreational function of forests is a task the safeguarding of which is solely assigned to bodies of public administration, anyone who has a real right may not claim neighbourly protection under public law in so far. On the relationship between operating plan approval, procedures are according to mining laws and the licensing procedures concerning construction permits.

  18. Completion of latest ABWR 'SHIKA Unit 2' construction

    International Nuclear Information System (INIS)

    Yamazaki, Tatsuhiro; Yoshimoto, Yuichiro

    2007-01-01

    The Shika Nuclear Power Station Unit No.2 of the Hokuriku Electric Power Company, Inc. is the first Advanced BWR unit built in Japan by a single contractor and it is among the largest nuclear power stations in Japan. Its construction started in August 1999 when the first construction permit was issued. The design and construction of the plant was carried out with utmost care for betterment of operational safety, reliability and economy. The construction advanced on schedule and the plant entered its commercial operation in March 2006 as planned. Hitachi, Ltd. supplied the entire plant from design, fabrication and construction including the reactor and steam turbine generation system. In the design and construction of the plant, the most advanced technology has been applied in order to match the civil construction process and aim to supply safest, reliable and economical power plant. (author)

  19. Cooperative Emissions Trading Game: International Permit Market Dominated by Buyers.

    Science.gov (United States)

    Honjo, Keita

    2015-01-01

    Rapid reduction of anthropogenic greenhouse gas emissions is required to mitigate disastrous impacts of climate change. The Kyoto Protocol introduced international emissions trading (IET) to accelerate the reduction of carbon dioxide (CO2) emissions. The IET controls CO2 emissions through the allocation of marketable emission permits to sovereign countries. The costs for acquiring additional permits provide buyers with an incentive to reduce their CO2 emissions. However, permit price has declined to a low level during the first commitment period (CP1). The downward trend in permit price is attributed to deficiencies of the Kyoto Protocol: weak compliance enforcement, the generous allocation of permits to transition economies (hot air), and the withdrawal of the US. These deficiencies created a buyer's market dominated by price-making buyers. In this paper, I develop a coalitional game of the IET, and demonstrate that permit buyers have dominant bargaining power. In my model, called cooperative emissions trading (CET) game, a buyer purchases permits from sellers only if the buyer forms a coalition with the sellers. Permit price is determined by bargaining among the coalition members. I evaluated the demand-side and supply-side bargaining power (DBP and SBP) using Shapley value, and obtained the following results: (1) Permit price is given by the product of the buyer's willingness-to-pay and the SBP (= 1 - DBP). (2) The DBP is greater than or equal to the SBP. These results indicate that buyers can suppress permit price to low levels through bargaining. The deficiencies of the Kyoto Protocol enhance the DBP, and contribute to the demand-side dominance in the international permit market.

  20. Partial construction halt to HTR reactor revoked

    International Nuclear Information System (INIS)

    Dauk, W.

    1981-01-01

    The Higher Administrative Court has dismissed the decision of the Arnsberg Administrative Court of February 5, 1981, which had decided in favour of an action for restitution of the suspensive power of an action for annulment of the part-construction permit for the Schmehausen nuclear power plant with a high-temperature reactor, i.e. in favour of a halt to construction. The Higher Administrative Court has revoked this decision on formal grounds - incompetence of the Administrative Court - and on substantial grounds - the halt to construction would be too hard on the power plant producer. The author agrees with this and discusses some aspects of judgment, effective legal aid, etc. (HSCH) [de

  1. Construction of cost effective homebuilt spin coater for coating ...

    African Journals Online (AJOL)

    We report the construction of a cost effective and low power consumption spin coater from a direct current (DC) brushless motor. The DC mechanical component is widdely available in the central processing unit (CPU) cooler. This set up permits simple operation where the DC voltage can be controlled manually in order to ...

  2. Waste Feed Delivery Environmental Permits and Approvals Plan

    Energy Technology Data Exchange (ETDEWEB)

    TOLLEFSON, K.S.

    2000-01-18

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches.

  3. Quantifying the CO{sub 2} permit price sensitivity

    Energy Technology Data Exchange (ETDEWEB)

    Gruell, Georg; Kiesel, Ruediger [Duisburg-Essen Univ., Essen (Germany). Inst. of Energy Trading and Financial Services

    2012-06-15

    Equilibrium models have been widely used in the literature with the aim of showing theoretical properties of emissions trading schemes. This paper applies equilibrium models to empirically study permit prices and to quantify the permit price sensitivity. In particular, we demonstrate that emission trading schemes both with and without banking are inherently prone to price jumps. (orig.)

  4. 36 CFR 228.54 - Single entry sales or permits.

    Science.gov (United States)

    2010-07-01

    ... 36 Parks, Forests, and Public Property 2 2010-07-01 2010-07-01 false Single entry sales or permits... MINERALS Disposal of Mineral Materials General Provisions § 228.54 Single entry sales or permits. The... plan which describes operating procedures and reclamation measures, unless the requirement is waived by...

  5. Waste Feed Delivery Environmental Permits and Approvals Plan

    International Nuclear Information System (INIS)

    TOLLEFSON, K.S.

    2000-01-01

    This plan describes the environmental permits approvals, and other requirements that may affect establishment of a waste feed delivery system for the Hanford Site's River Protection Project. This plan identifies and screens environmental standards for potential applicability, outlines alternatives for satisfying applicable standards, and describes preferred permitting and approval approaches

  6. 46 CFR 78.40-10 - No smoking permitted.

    Science.gov (United States)

    2010-10-01

    ... § 78.40-10 No smoking permitted. (a) The master shall have appropriate “No Smoking” signs posted and shall take all necessary precautions to prevent smoking or carrying of lighted or smoldering cigars... 46 Shipping 3 2010-10-01 2010-10-01 false No smoking permitted. 78.40-10 Section 78.40-10 Shipping...

  7. 77 FR 74507 - Endangered Species; Marine Mammals; Issuance of Permits

    Science.gov (United States)

    2012-12-14

    ... not operate to the disadvantage of the endangered species, and (3) the granted permit would be.... Zoological Park. 2012. 82880A Big Game Studio 77 FR 54604; September 5, October 17, 2012. 2012. 83520A Donald...; fax (703) 358-2280. Brenda Tapia, Program Analyst/Data Administrator, Branch of Permits, Division of...

  8. 76 FR 39368 - Migratory Bird Permits; Abatement Regulations

    Science.gov (United States)

    2011-07-06

    ... promulgating migratory bird permit regulations for a permit to use raptors (birds of prey) in abatement activities. Abatement means the use of trained raptors to flush, scare (haze), or take birds or other...). Background In response to public interest in the use of trained raptors to haze (scare) depredating and other...

  9. Wilderness Management... A Computerized System for Summarizing Permit Information

    Science.gov (United States)

    Gary H. Elsner

    1972-01-01

    Permits were first needed for visits to wilderness areas in California during summer 1971. A computerized system for analyzing these permits and summarizing information from them has been developed. It produces four types of summary tables: point-of-origin of visitors; daily variation in total number of persons present; variations in group size; and variations in...

  10. 19 CFR 12.99 - Procedures for permitted entry.

    Science.gov (United States)

    2010-04-01

    ... 19 Customs Duties 1 2010-04-01 2010-04-01 false Procedures for permitted entry. 12.99 Section 12.99 Customs Duties U.S. CUSTOMS AND BORDER PROTECTION, DEPARTMENT OF HOMELAND SECURITY; DEPARTMENT OF THE TREASURY SPECIAL CLASSES OF MERCHANDISE Switchblade Knives § 12.99 Procedures for permitted entry...

  11. 76 FR 74070 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2011-11-30

    ... Endangered Species Act of 1973, as amended (16 U.S.C. 1531 et seq.). Dated: November 21, 2011. Lynn M. Lewis...-FF03E00000] Endangered and Threatened Species; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... permits to conduct certain activities with endangered species under the authority of the Endangered...

  12. 78 FR 9415 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2013-02-08

    ...). Authority: The authority for this notice is the Endangered Species Act of 1973, as amended (16 U.S.C. 1531...-FF03E00000] Endangered and Threatened Species; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION... permits to conduct certain activities with endangered species under the authority of the Endangered...

  13. 78 FR 57410 - Endangered Species; Issuance of Permits

    Science.gov (United States)

    2013-09-18

    ... permits to conduct certain activities with endangered species under the authority of the Endangered Species Act, as amended (Act). ADDRESSES: Endangered Species Program Manager, Ecological Services, U.S...-FF01E00000] Endangered Species; Issuance of Permits AGENCY: Fish and Wildlife Service, Interior. ACTION...

  14. 75 FR 45650 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-03

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N149; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of an application to...

  15. 76 FR 8374 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-14

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N021; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  16. 75 FR 28278 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R1-ES-2010-N092; 10120-1113-0000-F5] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY: In accordance with the requirements of the...

  17. 76 FR 33334 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-06-08

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N112; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  18. 75 FR 52012 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-08-24

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N181; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  19. 75 FR 5101 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-02-01

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N010; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  20. 76 FR 18576 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-04-04

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N056; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  1. 76 FR 10063 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2011-02-23

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2011-N026; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  2. 75 FR 27361 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-05-14

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R6-ES-2010-N095; 60120-1113-0000-D2] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of receipt of applications for permits. SUMMARY: We announce our receipt of applications to...

  3. 75 FR 20621 - Endangered and Threatened Wildlife and Plants; Permits

    Science.gov (United States)

    2010-04-20

    ... DEPARTMENT OF THE INTERIOR Fish and Wildlife Service [FWS-R3-ES-2009-N0054]; [30120-1113-0000-F6] Endangered and Threatened Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of availability of permit applications; request for comments. SUMMARY: We, the U.S. Fish and...

  4. 43 CFR 13.4 - Terms of permit.

    Science.gov (United States)

    2010-10-01

    ... § 13.4 Terms of permit. Every permit shall describe the location of the vending facilities and shall be... Interior bureau or office for each location. The head of the Interior bureau or office may require... efficiency as may be prescribed by the head of the Interior bureau or office. Such standards shall conform...

  5. 50 CFR 300.182 - HMS international trade permit.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 7 2010-10-01 2010-10-01 false HMS international trade permit. 300.182... FISHERIES REGULATIONS International Trade Documentation and Tracking Programs for Highly Migratory Species § 300.182 HMS international trade permit. (a) General. An importer, entering for consumption fish or...

  6. Permits for coal-fired power plants under scrutiny

    International Nuclear Information System (INIS)

    Hoekstra, B.

    2011-01-01

    The attorney-general of the European Court of Justice offered advice to the European Judge on the prejudicial questions of the Department of Administrative Law of the Council of State in the framework of appeal cases against environmental permits of three planned power plants in the Netherlands. The advice may have large consequences for these permits. [nl

  7. 77 FR 49483 - Actions on Special Permit Applications

    Science.gov (United States)

    2012-08-16

    ... modify the special permit Town, South Africa. 178.277(b)(1). to increase the water capacity from 17000... prevent leakage during transportation. (mode 1). 15667-N Volga Dnepr--UNIQUE AIR 49 CFR 172.101 Column To...). NEW SPECIAL PERMIT WITHDRAWN 15494-N Johnson Controls Battery 49 CFR 173.159 To authorize the Group...

  8. 76 FR 6490 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-02-04

    ... permit to take (trap, seine, capture, handle, fin clip, release, collect, transport, and captive breed... requests a permit to take (capture, handle, collect, transport, and kill) the Lost River sucker (Deltistes... Service, invite the public to comment on the following applications to conduct certain activities with...

  9. 48 CFR 52.247-2 - Permits, Authorities, or Franchises.

    Science.gov (United States)

    2010-10-01

    ... Franchises. 52.247-2 Section 52.247-2 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION....247-2 Permits, Authorities, or Franchises. As prescribed in 47.207-1(a), insert the following clause: Permits, Authorities, or Franchises (JAN 1997) (a) The offeror does □, does not □, hold authorization from...

  10. 75 FR 4136 - Pipeline Safety: Request To Modify Special Permit

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2009-0377] Pipeline Safety: Request To Modify Special Permit AGENCY: Pipeline and Hazardous... coating on its gas pipeline. DATES: Submit any comments regarding this special permit modification request...

  11. 76 FR 11853 - Pipeline Safety: Request for Special Permit

    Science.gov (United States)

    2011-03-03

    ... DEPARTMENT OF TRANSPORTATION Pipeline and Hazardous Materials Safety Administration [Docket No. PHMSA-2011-0027] Pipeline Safety: Request for Special Permit AGENCY: Pipeline and Hazardous Materials... a 24-inch mainline natural gas pipeline, 595 feet in length. The first segment of the special permit...

  12. 29 CFR 1910.146 - Permit-required confined spaces.

    Science.gov (United States)

    2010-07-01

    ... any failure of hazard control or monitoring equipment) or event internal or external to the permit... could be trapped or asphyxiated by inwardly converging walls or by a floor which slopes downward and... complying with the permit space requirements that apply to all employers, each contractor who is retained to...

  13. 75 FR 52965 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-08-30

    ... appointment only, during normal business hours at the U.S. Fish and Wildlife Service, 500 Gold Ave., SW., Room... permit for research and recovery purposes to conduct presence/absence surveys for American burying beetle...., Round Rock, Texas. Applicant requests an amendment to a current permit for research and recovery...

  14. 50 CFR 21.27 - Special purpose permits.

    Science.gov (United States)

    2010-10-01

    ... certification required by part 13 and makes a sufficient showing of benefit to the migratory bird resource..., salvage, otherwise acquire, transport, or possess migratory birds, their parts, nests, or eggs for any... WILDLIFE AND PLANTS (CONTINUED) MIGRATORY BIRD PERMITS Specific Permit Provisions § 21.27 Special purpose...

  15. 9 CFR 73.10 - Permitted dips; substances allowed.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Permitted dips; substances allowed. 73.10 Section 73.10 Animals and Animal Products ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT... flowers of sulphur or sulphur flour to 100 gallons of water; or a specifically permitted proprietary brand...

  16. 77 FR 54604 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-09-05

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... applicant requests a permit to export sport hunted trophies of one male addax (Addax nasomaculatus), one.... Applicant: John Fry, Carson City, NV; PRT-82592A The applicant requests a permit to import a sport-hunted...

  17. 78 FR 76171 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-12-16

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and...: Geoffrey Ridder; Utopia, TX; PRT-00030B The applicant requests a permit to export the sport-hunted trophy... period. Multiple Applicants The following applicants each request a permit to import the sport- hunted...

  18. 40 CFR 68.85 - Hot work permit.

    Science.gov (United States)

    2010-07-01

    ... Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Program 3 Prevention Program § 68.85 Hot work permit. (a) The owner or operator shall issue a hot work permit for hot work operations conducted on or near a covered process. (b...

  19. 40 CFR 123.25 - Requirements for permitting.

    Science.gov (United States)

    2010-07-01

    ... MS4, may I share the responsibility to implement the minimum control measures with other entities... held prior to issuing any permit while reducing the amount of advance notice of such a hearing. State... individual, including the Director, who has or shares authority to approve all or portions of permits either...

  20. 29 CFR 2.12 - Audiovisual coverage permitted.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Audiovisual coverage permitted. 2.12 Section 2.12 Labor Office of the Secretary of Labor GENERAL REGULATIONS Audiovisual Coverage of Administrative Hearings § 2.12 Audiovisual coverage permitted. The following are the types of hearings where the Department...

  1. 76 FR 63322 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-10-12

    ... from Helianthus paradoxus (Pecos sunflower) from plants in Texas. Permit TE-829761 Applicant: Bureau of... for endangered plant species, and 50 CFR 17.72 for threatened plant species. Applications Available...: Texas A & M University, Galveston, Texas. Applicant requests a new permit for husbandry and holding of...

  2. 75 FR 67765 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2010-11-03

    ... collect leaf tissue and seeds from the following endangered plants: South Texas ambrosia (Ambrosia... transportation, at the Miller Park Zoo. Permit TE-24625A Applicant: Wendy Leonard, San Antonio, Texas. Applicant...-cheeked warbler (Dendroica chrysoparia) and black-capped vireo (Vireo atricapilla) within Texas. Permit TE...

  3. 78 FR 14110 - Emergency Issuance of Endangered Species Permit

    Science.gov (United States)

    2013-03-04

    ... issued an endangered species permit to address emergency veterinary care for an injured green sea turtle...] Emergency Issuance of Endangered Species Permit AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered and threatened species under section 10(a)(1)(A) of the Endangered Species Act of 1973, as amended...

  4. 21 CFR 1312.13 - Issuance of import permit.

    Science.gov (United States)

    2010-04-01

    ... drug listed in Schedule III, IV, or V if he finds: (1) That the substance is crude opium, poppy straw... shall render it void and of no effect. Permits are not transferable. Each copy of the permit shall have... the Act (21 U.S.C. 952(a)(1) or (a)(2)(A)), the importation of approved narcotic raw material (opium...

  5. 23 CFR 650.807 - Bridges requiring a USCG permit.

    Science.gov (United States)

    2010-04-01

    ... engineering, social, economic and environmental benefit and impacts. (e) The HA shall consider hydraulic... permit. (a) The USCG has the responsibility (1) to determine whether a USCG permit is required for the... the USCG to be involved throughout the environmental review process in accordance with 23 CFR part 771...

  6. 78 FR 12776 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-02-25

    ... and recovery purposes to conduct pollination on 36 individual adult Arizona hedgehog cactus.... Permit TE-43777A Applicant: Sea Life US, LLC, Grapevine, Texas. Applicant requests an amendment to a... Aquarium, Grapevine, Texas. Permit TE-92366A Applicant: Kimley-Horn and Associates, Inc., Dallas, Texas...

  7. 75 FR 53708 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-09-01

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  8. 78 FR 57650 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-19

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  9. 77 FR 12611 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-03-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  10. 75 FR 69699 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-11-15

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  11. 75 FR 79387 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-12-20

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  12. 76 FR 14424 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-03-16

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  13. 77 FR 5045 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2012-02-01

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... certain activities with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity...

  14. 78 FR 16703 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-03-18

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  15. 76 FR 70160 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-11-10

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  16. 78 FR 55287 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2013-09-10

    ...-FF08E00000] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior... with endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also...

  17. 76 FR 20004 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-04-11

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  18. 75 FR 20857 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2010-04-21

    ...] Endangered Species Recovery Permit Applications AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice... endangered species. With some exceptions, the Endangered Species Act (Act) prohibits activities with endangered and threatened species unless a Federal permit allows such activity. The Act also requires that we...

  19. 33 CFR 325.1 - Applications for permits.

    Science.gov (United States)

    2010-07-01

    ... process. Whenever the district engineer becomes aware of planning for work which may require a DA permit... in the basic timing sequence used by the Corps of Engineers in processing applications for DA permits.... Upon receipt of such request, the district engineer will assure the conduct of an orderly process which...

  20. 40 CFR 76.9 - Permit application and compliance plans.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Permit application and compliance plans. 76.9 Section 76.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM § 76.9 Permit application and...

  1. 40 CFR 97.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.223 Section 97.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR SO2...

  2. 40 CFR 96.223 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.223 Section 96.223 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  3. 40 CFR 96.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 96.123 Section 96.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal...

  4. 40 CFR 97.123 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.123 Section 97.123 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... facilitate coordination of the renewal of the CAIR permit with issuance, revision, or renewal of the CAIR NOX...

  5. 40 CFR 97.323 - CAIR permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 20 2010-07-01 2010-07-01 false CAIR permit contents and term. 97.323 Section 97.323 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR PROGRAMS... authority, as necessary to facilitate coordination of the renewal of the CAIR permit with issuance, revision...

  6. 27 CFR 555.45 - Original license or permit.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 3 2010-04-01 2010-04-01 false Original license or permit. 555.45 Section 555.45 Alcohol, Tobacco Products, and Firearms BUREAU OF ALCOHOL, TOBACCO, FIREARMS... Original license or permit. (a) Licenses issued prior to May 24, 2003. Any person who intends to engage in...

  7. 25 CFR 166.223 - Can I use a permit as collateral for a loan?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can I use a permit as collateral for a loan? 166.223... PERMITS Permit Requirements Permit (leasehold) Mortgage § 166.223 Can I use a permit as collateral for a loan? We may approve a permit containing a provision that authorizes the permittee to encumber the...

  8. Emission Permits trade between the Nordic and Baltic Countries

    Energy Technology Data Exchange (ETDEWEB)

    Alm, Leif Kristian

    2000-05-01

    A bottom-up technology oriented model of the energy systems in the Nordic and Baltic countries have been constructed and used for analysing an optimal set of energy and emission trading within the region. The model used is MARKAL, which has been developed within the IEA-ETSAP. The analyses are based on national emission levels agreed on in the Kyoto protocol (and the following burden sharing negotiations within the European Union), and with an additional strengthening after 2010. Only energy related CO{sub 2} emissions are explicitly considered. Nuclear power in Sweden is assumed to be phased out. The results show that especially Norway and Sweden have large abatement costs when acting alone, whale the Baltic countries will probably not need to take domestic actions due to the Kyoto protocol if they act alone, as the restructuring of their economies in the beginning of the 1990ties cut emissions (and their economies) dramatically. It is shown that emission trading among the Nordic and Baltic countries can reduce abatement costs among the Nordic countries significantly, possibly down to a level equivalent to a world market (Annex I) permit price. Extending the Nordic common electricity market to Balticum will have minor influence on overall energy system costs. There is no pronounced direction for net electricity flow between the Nordic and Baltic countries. High marginal costs during peak hours in Balticum indicate that imports of Nordic hydro power during peak-hours could be a cost-effective option. This possibility could be implemented with a subsea AC/DC connection between Sweden and Latvia. It is politically viable to develop more hydropower in Norway, this country will be the major electricity exporter in the region, while Sweden will be the main importer. Changing scenario assumptions, i.e. no more Norwegian hydropower, but life extension of Swedish nuclear power, could change this picture. (author)

  9. Waste water pilot plant research, development, and demonstration permit application

    International Nuclear Information System (INIS)

    1993-03-01

    This permit application has been prepared to obtain a research, development, and demonstration permit to perform pilot-scale treatability testing on the 242-A Evaporator process condensate waste water effluent stream. It provides the management framework, and controls all the testing conducted in the waste water pilot plant using dangerous waste. It also provides a waste acceptance envelope (upper limits for selected constituents) and details the safety and environmental protection requirements for waste water pilot plant testing. This permit application describes the overall approach to testing and the various components or requirements that are common to all tests. This permit application has been prepared at a sufficient level of detail to establish permit conditions for all waste water pilot plant tests to be conducted

  10. Permissible state permit/fee systems for radioactive materials transportation

    International Nuclear Information System (INIS)

    Friel, L.

    1987-01-01

    Many state permit/fee systems for radioactive materials transportation have been ruled inconsistent with federal law invalidated by the courts. As the date for repository operation, and its associated transportation, draws near, more states can be expected to adopt permit/fee systems. Examination of the U.S. Department of Transportation's advisory rulings and federal court cases on previous permit/fee systems gives general guidance on the type of permit/fee systems most likely to withstand challenges. Such a system would: have a simplified permit application with minimal information requirements; address a federally-defined class of hazardous or radioactive materials; allow access to all shipments conducted in compliance with federal law; charge a fee reasonably related to the costs imposed on the state by the transportation; and minimize the potential for re-directing shipments to other jurisdictions

  11. Nuclear installations operated without the required permits: the policy pursued in the Netherlands

    International Nuclear Information System (INIS)

    Huygen, A.

    1994-01-01

    The authoress presents two topical cases from the Netherlands where two nuclear installations are allowed to continue operation by a joint decision of the government and the courts, although the legal operating permits have been declared void by a government senate. The legal basis constructed for this approach allowing plant operation to continue for a limited number of years is an explicit statement by the government to tolerate such procedure. The installations are the Bodeward nuclear power station with a BWR and the Almelo URENCO uranium enrichment facility. (orig./HSCH) [de

  12. 7 CFR 330.203 - Action on applications for permits to move plant pests; form of and conditions in permits.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Action on applications for permits to move plant pests... PEST REGULATIONS; GENERAL; PLANT PESTS; SOIL, STONE, AND QUARRY PRODUCTS; GARBAGE Movement of Plant Pests § 330.203 Action on applications for permits to move plant pests; form of and conditions in...

  13. 78 FR 6817 - Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for...

    Science.gov (United States)

    2013-01-31

    ... Wisconsin Public Service Corporation--JP Pulliam Plant. Pursuant to section 505(b)(2) of the Act, a... ENVIRONMENTAL PROTECTION AGENCY [FRL 9774-6] Clean Air Act Operating Permit Program; Petition for Objection to State Operating Permit for Wisconsin Public Service Corporation--JP Pulliam Plant AGENCY...

  14. 75 FR 22400 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator...

    Science.gov (United States)

    2010-04-28

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9142-6] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Wheelabrator Baltimore, L.P., Baltimore City, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean...

  15. 76 FR 53452 - Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit...

    Science.gov (United States)

    2011-08-26

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9457-3 ] Clean Air Act Operating Permit Program; Response to Petition To Reopen the 2001 Title V Permit for Reliant Portland Generating Station, Upper Mount Bethel Township, Northampton County, PA AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of action...

  16. 75 FR 75463 - Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper...

    Science.gov (United States)

    2010-12-03

    ... ENVIROMENTAL PROTECTION AGENCY [FRL-9234-9] Clean Air Act Operating Permit Program; Petition To Object to Title V Permit for Luke Paper Company, Luke, MD AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of final action. SUMMARY: Pursuant to section 505(b)(2) of the Clean Air Act (CAA), the...

  17. Grout treatment facility dangerous waste permit application

    International Nuclear Information System (INIS)

    1992-07-01

    The Grout Treatment Facility (GTF) will provide permanent disposal for approximately 43 Mgal of radioactive liquid waste currently being stored in underground tanks on the Hanford Site. The first step in permanent disposal is accomplished by solidifying the low-level liquid waste with cementitious dry materials. The resulting grout is cast within underground vaults. This report on the GTF contains information on the following: Hanford Site Maps, road evaluation for the grout treatment facility, Department of Ecology certificate of non-designation for centralia fly ash, double-shell tank waste compositional modeling, laboratory analysis reports for double-shell tank waste, stored in tanks 241-AN-103, 241-AN-106, and 241-AW-101, grout vault heat transfer results for M-106 grout formulation, test results for extraction procedure toxicity testing, test results for toxicity testing of double-shell tank grout, pilot-scale grout production test with a simulated low-level waste, characterization of simulated low-level waste grout produced in a pilot-scale test, description of the procedure for sampling nonaging waste storage tanks, description of laboratory procedures, grout campaign waste composition verification, variability in properties of grouted phosphate/sulfate N-reactor waste, engineering drawings, description of operating procedures, equipment list--transportable grout equipment, grout treatment facility--tank integrity assessment plan, long-term effects of waste solutions on concrete and reinforcing steel, vendor information, grout disposal facilities construction quality assurance plan, and flexible membrane liner/waste compatibility test results

  18. Hanford Facility Dangerous Waste Permit Application, 222-S Laboratory Complex

    International Nuclear Information System (INIS)

    WILLIAMS, J.F.

    2000-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the 222-S Laboratory Complex (this document, DOE/RL-91-27). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1987 and 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the 222-S Laboratory Complex permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this 222-S Laboratory Complex permit application documentation is current as of August 2000

  19. Construction dust amelioration techniques.

    Science.gov (United States)

    2012-04-01

    Dust produced on seasonal road construction sites in Alaska is both a traffic safety and environmental concern. Dust emanating from : unpaved road surfaces during construction severely reduces visibility and impacts stopping sight distance, and contr...

  20. Improving concrete overlay construction.

    Science.gov (United States)

    2010-03-01

    Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...

  1. Construction project management handbook.

    Science.gov (United States)

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  2. Visualization of construction engineering

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun

    2000-01-01

    It is required for nuclear power plant construction to reduce construction cost and shorten construction period. An early and accurate construction planning including schedule coordination among the companies has recently become more important and it is possible to obtain necessary information for construction planning in early stage. In this situation, we have been developing a visualization system for construction engineering for nuclear power plants. This system has an interface with the existing Plant Layout 3D-CAD system and consists of three sub systems: (1) Scheduling and simulation system, (2) Yard planning system and (3) Scaffolding planning system. This paper describes overview of this system. This visualization system is very helpful for construction engineers to easily understand situation and environment around installation area, to easily plan a work sequence and confirm the planned schedule, and it is also effective for customers and workers to understand the planning. As a result, this visualization system enables safety and high quality construction. (author)

  3. Construction Sector (NAICS 23)

    Science.gov (United States)

    Find environmental regulatory information for the construction sector, including the construction of buildings or engineering projects. This includes RCRA information for hazardous waste, refrigeration compliance, asbestos, effluent guidelines & lead laws

  4. Organizational Behaviour in Construction

    DEFF Research Database (Denmark)

    Kreiner, Kristian

    2013-01-01

    Review of: Organizational Behaviour in Construction / Anthony Walker (Wiley-Blackwell,2011 336 pp)......Review of: Organizational Behaviour in Construction / Anthony Walker (Wiley-Blackwell,2011 336 pp)...

  5. USAID Construction Assessment

    Data.gov (United States)

    US Agency for International Development — The USAID construction assessment is a survey of the character, scope, value and management of construction activities supported by USAID during the period from June...

  6. Validating MEDIQUAL Constructs

    Science.gov (United States)

    Lee, Sang-Gun; Min, Jae H.

    In this paper, we validate MEDIQUAL constructs through the different media users in help desk service. In previous research, only two end-users' constructs were used: assurance and responsiveness. In this paper, we extend MEDIQUAL constructs to include reliability, empathy, assurance, tangibles, and responsiveness, which are based on the SERVQUAL theory. The results suggest that: 1) five MEDIQUAL constructs are validated through the factor analysis. That is, importance of the constructs have relatively high correlations between measures of the same construct using different methods and low correlations between measures of the constructs that are expected to differ; and 2) five MEDIQUAL constructs are statistically significant on media users' satisfaction in help desk service by regression analysis.

  7. Study finds declining construction leadtimes for nukes being built

    International Nuclear Information System (INIS)

    Smock, R.

    1983-01-01

    A new Electric Power Research Institute (EPRI) study of 26 nuclear projects shows a decrease in the leadtime for nuclear plants under construction in contrast to the findings of other studies. The EPRI study plots construction leadtime against the year of construction permit issuance rather than the year of completion, and it eliminates management delays, physical plant differences, and management differences. The result is a two-part trendline reflecting the discontinuity of regulatory ratchet effects, which cause 50% of construction leadtime delay while labor material delivery problems account for 20% and deliberate delays 22% of leadtime delay. When allowance is made for deliberate delays, there is no growth in construction leadtime. There was no correlation of utility finances, the accuracy of load growth forecasts, or the state regulatory environment to the length of construction. 3 figures,

  8. Heterotic string construction

    International Nuclear Information System (INIS)

    Schellekens, A.N.

    1989-01-01

    In this paper an elementary introduction to the principles of four-dimensional string construction will be given. Although the emphasis is on lattice constructions, almost all results have further, and often quite straightforward generalizations to other constructions. Since heterotic strings look phenomenologically more promising than type-II theories the authors only consider the former, although everything can easily be generalized to type-II theories. Some additional aspects of lattice constructions are discussed, and an extensive review can be found

  9. Political and Economic Scope for Permit Markets in Europe

    DEFF Research Database (Denmark)

    Svendsen, Gert Tinggaard

    1999-01-01

    (organized polluters) due to the possibility of a free, initial distribution (grand-fathering). As such, a mix of green taxes (in relation to non-organized interests) and grandfathered permit markets (in relation to organized interests) should be considered in the search for cost-effective and politically...... of permit markets in the US. Therefore, the policy recommendation for e.g. CO2 reduction in Europe is to apply taxation in relation to large and non-organized groups only, such as households and the transportation sector. A permit market, on the other hand, is politically more attrac-tive to the industry...

  10. Pricing emission permits in the absence of abatement

    International Nuclear Information System (INIS)

    Hintermann, Beat

    2012-01-01

    If emissions are stochastic and firms are unable to control them through abatement, the cap in a permit market may be exceeded, or not be reached. I derive a binary options pricing formula that expresses the permit price as a function of the penalty for noncompliance and the probability of an exceeded cap under the assumption of no abatement. I apply my model to the EU ETS, where the rapid introduction of the market made it difficult for firms to adjust their production technology in time for the first phase. The model fits the data well, implying that the permit price may have been driven by firms hedging against stochastic emissions.

  11. Enforcing Transferable Permit Systems in the Presence of Market Power

    International Nuclear Information System (INIS)

    Chavez, C.A.; Stanlund, J.K.

    2003-01-01

    We derive an enforcement strategy for a transferable permit system in the presence of market power that achieves complete compliance in a cost-effective manner. We show that the presence of a firm with market influence makes designing an enforcement strategy more difficult than enforcing a perfectly competitive system. We also re-consider the suggestion that a firm with market influence should be allocated permits so that it chooses to not participate in the permit market. When enforcement and its costs are taken into account, that suggestion does not hold except in a very special case

  12. Identification of permit and waste acceptance criteria provisions requiring modification for acceptance of commercial mixed waste

    International Nuclear Information System (INIS)

    1994-03-01

    In October 1990, representatives of States and compact regions requested that the US Department of Energy (DOE) explore an agreement with host States and compact regions under which DOE would accept commercial mixed low-level radioactive waste (LLW) at DOE's own treatment and disposal facilities. A program for DOE management of commercial mixed waste is made potentially more attractive in light of the low commercial mixed waste volumes, high regulatory burdens, public opposition to new disposal sites, and relatively high cost of constructing commercial disposal facilities. Several studies were identified as essential in determining the feasibility of DOE accepting commercial mixed waste for disposal. The purpose of this report is to identify any current or proposed waste acceptance criteria (WAC) or Resource Conservation and Recovery Act (RCRA) provisions that would have to be modified for commercial mixed waste acceptance at specified DOE facilities. Following the introduction, Section 2 of this report (a) provides a background summary of existing and proposed mixed waste disposal facilities at each DOE site, and (b) summarizes the status of any RCRA Part B permit and WAC provisions relating to the disposal of mixed waste, including provisions relating to acceptance of offsite waste. Section 3 provides overall conclusions regarding the current status and permit modifications that must be implemented in order to grant DOE sites authority under their permits to accept commercial mixed waste for disposal. Section 4 contains a list of references

  13. Safety in construction industry

    International Nuclear Information System (INIS)

    Khan, A.M.

    1979-01-01

    Causative factors of accidents in construction industry in the context of experience of construction work of the Rajasthan Atomic Power Project are enumerated. The aspect of accident cost - direct and indirect - is discussed briefly. Setting up of a safety set-up at construction sites is emphasized and principles which should guide the accident prevention programme are spelt out. (M.G.B.)

  14. Sustainable construction: construction and demolition waste reconsidered.

    Science.gov (United States)

    del Río Merino, Mercedes; Izquierdo Gracia, Pilar; Weis Azevedo, Isabel Salto

    2010-02-01

    Construction activity in Europe has increased substantially in the past decade. Likewise, there has also been a commensurate rise in the generation of construction and demolition waste (C&DW). This, together with the fact that in many European countries the rate of recycling and reuse of C&DW is still quite low has engendered a serious environmental problem and a motivation to develop strategies and management plans to solve it. Due to its composition, there is a significant potential to reuse and/or recycle C&DW, and thereby, contribute to improving the sustainability of construction and development, but practical procedures are not yet widely known or practiced in the construction industry. This article (a) summarizes the different applications that are presently practiced to optimize the recovery and/or application of C&DW for reuse, and (b) proposes various measures and strategies to improve the processing of this waste. The authors suggest that to enhance environmental effectiveness, a conscious and comprehensive C&DW management plan should be implemented in each jurisdiction. More precisely, this study presents a holistic approach towards C&DW management, through which environmental benefits can be achieved through the application of new construction methods that can contribute to sustainable growth.

  15. TPX tokamak construction management

    International Nuclear Information System (INIS)

    Knutson, D.; Kungl, D.; Seidel, P.; Halfast, C.

    1995-01-01

    A construction management contract normally involves the acquisition of a construction management firm to assist in the design, planning, budget conformance, and coordination of the construction effort. In addition the construction management firm acts as an agent in the awarding of lower tier contracts. The TPX Tokamak Construction Management (TCM) approach differs in that the construction management firm is also directly responsible for the assembly and installation of the tokamak including the design and fabrication of all tooling required for assembly. The Systems Integration Support (SIS) contractor is responsible for the architect-engineering design of ancillary systems, such as heating and cooling, buildings, modifications and site improvements, and a variety of electrical requirements, including switchyards and >4kV power distribution. The TCM will be responsible for the procurement of materials and the installation of the ancillary systems, which can either be performed directly by the TCM or subcontracted to a lower tier subcontractor. Assurance that the TPX tokamak is properly assembled and ready for operation when turned over to the operations team is the primary focus of the construction management effort. To accomplish this a disciplined constructability program will be instituted. The constructability effort will involve the effective and timely integration of construction expertise into the planning, component design, and field operations. Although individual component design groups will provide liaison during the machine assembly operations, the construction management team is responsible for assembly

  16. Resource Conservation and Recovery Act: Part B, Permit application

    International Nuclear Information System (INIS)

    1992-03-01

    This report contains information related to the permit application for the WIPP facility. Information is presented on solid waste management; personnel safety; emergency plans; site characterization; applicable regulations; decommissioning; and ground water monitoring requirements

  17. 77 FR 49453 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-08-16

    ... citations to, and analyses of, the applicable laws and regulations. We will not consider or include in our... period. Applicant: Alexandria Rosati, Cambridge, MA; PRT-72061A The applicant requests a permit to...

  18. 75 FR 34766 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-06-18

    ... permit to export one female captive bred giant panda (Ailuropoda melanoleuca) born at the zoo in 2007and.... Applicant: United States Department of Agriculture/Animal and Plant Health Inspection Service/Wildlife...

  19. 50 CFR 25.55 - Refuge admission permits.

    Science.gov (United States)

    2010-10-01

    ...-specific permits, at Fish and Wildlife Service Regional and Washington, DC Offices, and at other locations....55 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR... the holder on the front. ...

  20. Oversize/overweight vehicle unified permitting process (UPP) : phase I.

    Science.gov (United States)

    2017-08-01

    Multiple jurisdictions within Minnesota process oversize/overweight (OSOW) permits for the movement of freight on state roadways, county roads, and municipal and township streets. Movement of freight has increased in recent years to help support econ...

  1. Oversize/overweight permitting practices review : phase II.

    Science.gov (United States)

    2013-02-01

    This study explores a more detailed analysis of the permitting process in the Mid-Atlantic Region and : delves into operational practice, and theory and history of the practice among states. The states : practices examined in greater detail include C...

  2. Hydroelectric Generating Facilities General Permit (HYDROGP) for Massachusetts & New Hampshire

    Science.gov (United States)

    Documents, links & contacts for the Notice of Availability of the Final NPDES General Permits (HYDROGP) for Discharges at Hydroelectric Generating Facilities in Massachusetts (MAG360000) and New Hampshire (NHG360000) and Tribal Lands in the State of MA.

  3. 36 CFR 296.10 - Suspension and revocation of permits.

    Science.gov (United States)

    2010-07-01

    ... AGRICULTURE PROTECTION OF ARCHAEOLOGICAL RESOURCES: UNIFORM REGULATIONS § 296.10 Suspension and revocation of... correct the situation which led to suspension of the permit. (b) Suspension or revocation for management...

  4. 78 FR 75369 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-12-11

    ... into the wild in Oklahoma. Permit TE-833851 Applicant: City of Austin Watershed Protection Department... reddelli) Black-capped vireo (Vireo atricapilla) Bone Cave harvestman (Texella reyesi) Braken Bat Cave...

  5. Storm Water General Permit 1 for Industrial Facilities

    Data.gov (United States)

    Iowa State University GIS Support and Research Facility — General permit #1 for storm water discharges associated with industrial facilities in Iowa for the National Pollutant Discharge Elimination System (NPDES) program.

  6. 48 CFR 52.236-7 - Permits and Responsibilities.

    Science.gov (United States)

    2010-10-01

    ... obtaining any necessary licenses and permits, and for complying with any Federal, State, and municipal laws... negligence. The Contractor shall also be responsible for all materials delivered and work performed until...

  7. NPDES Permit for Crow Nation Water Treatment Plants in Montana

    Science.gov (United States)

    Under NPDES permit MT-0030538, the U.S. Bureau of Indian Affairs is authorized to discharge from the Crow Agency water treatment plants via the wastewater treatment facility located in Bighorn County, Montana to the Little Bighorn River.

  8. 75 FR 30428 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-06-01

    ... (Oreonax flavicauda) from Peru for the purpose of enhancement of the species through scientific research... be conducted under the remainder of the 5-year period of the permit. Applicant: Natural History...

  9. RHIC beam permit and quench detection communications system

    International Nuclear Information System (INIS)

    Conkling, C.R. Jr.

    1997-01-01

    A beam permit module has been developed to concentrate RHIC, subsystem sensor outputs, permit beam, and initiate emergency shutdowns. The modules accept inputs from the vacuum, cryogenic, power supply, beam loss, and superconducting magnet quench detection systems. Modules are located at equipment locations around the RHIC ring. The modules are connected by three fiberoptic communications links; a beam permit link, and two magnet power supply interlock links. During operation, carrier presence allows beam. If a RHIC subsystem detects a fault, the beam permit carrier terminates - initiating a beam dump. If the fault was a superconducting magnet quench, a power supply interlock carrier terminates - initiating an emergency magnet power dump. In addition, the master module triggers an event to cause remote sensors to log and hold data at the time-of-failure

  10. Resource Conservation and Recovery Act Part B permit application

    International Nuclear Information System (INIS)

    1992-01-01

    This permit application (Vol. 7) for the WIPP facility contains appendices related to the following information: Ground water protection; personnel; solid waste management; and memorandums concerning environmental protection standards

  11. 77 FR 3493 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2012-01-24

    ..., Moseley, VA; PRT-57466A. The applicant requests a permit to import 6 female captive-born cheetahs (Acinonyx jubatus jubatus) from De Wildt Cheetah Breeding Centre, De Wildt, South Africa for the purpose of...

  12. 9 CFR 72.13 - Permitted dips and procedures.

    Science.gov (United States)

    2010-01-01

    ... proprietary brands of permitted dips—as well the use of compressed air, vat management techniques, and other... maintained and that under actual field conditions the dipping of cattle with a solution of definite strength...

  13. 76 FR 27660 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-05-12

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... applicant requests a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus...

  14. 76 FR 20705 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2011-04-13

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable.... Multiple Applicants The following applicants each request a permit to import the sport- hunted trophy of...

  15. 78 FR 59052 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-09-25

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and.... Multiple Applicants The following applicants each request a permit to import the sport- hunted trophy of...

  16. 78 FR 45954 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-07-30

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... Applicants The following applicants each request a permit to import the sport- hunted trophy of one male...

  17. 76 FR 52965 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-08-24

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from...

  18. 75 FR 63196 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-10-14

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled...

  19. 75 FR 76022 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-12-07

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... public display. Multiple Applicants The following applicants each request a permit to import the sport...

  20. 76 FR 39432 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-07-06

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and.... Multiple Applicants (New Applications) The following applicants each request a permit to import the sport...

  1. 78 FR 112 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-01-02

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  2. 78 FR 62647 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-10-22

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from...

  3. 77 FR 72882 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-12-06

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  4. 75 FR 41235 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-15

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... the species. Multiple Applicants The following applicants each request a permit to import the sport...

  5. 78 FR 21627 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2013-04-11

    ... decisions are: (1) Those supported by quantitative information or studies; and (2) Those that include... Tapiridae Applicant: Michael Tomb, Jackson, LA; PRT-01602B The applicant requests a permit to import a sport...

  6. 75 FR 44986 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-07-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... requests a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  7. 76 FR 51051 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-08-17

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  8. 76 FR 32223 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-06-03

    ... studies; and (2) Those that include citations to, and analyses of, the applicable laws and regulations. We... Applicants The following applicants each request a permit to import the sport- hunted trophy of one male...

  9. 76 FR 80384 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-12-23

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... a permit to import a sport-hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled...

  10. 76 FR 60862 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-30

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... The following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  11. 75 FR 19656 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-04-15

    ... agency decisions are: (1) Those supported by quantitative information or studies; and (2) Those that... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  12. 76 FR 72434 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-11-23

    ...) Those supported by quantitative information or studies; and (2) Those that include citations to, and... following applicants each request a permit to import the sport- hunted trophy of one male bontebok...

  13. 76 FR 65207 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-10-20

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... applicants each request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus...

  14. 76 FR 71069 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-11-16

    ... quantitative information or studies; and (2) Those that include citations to, and analyses of, the applicable... request a permit to import the sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus...

  15. Resource Conservation and Recovery Act, Part B Permit Application

    International Nuclear Information System (INIS)

    1992-01-01

    This report, Part B (Vol. 3) of the permit application for the WIPP facility, contains information related to the site characterization of the facility, including geology, design, rock salt evaluations, maps, drawings, and shaft excavations

  16. 77 FR 7175 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2012-02-10

    ...: Wildlife World Zoo, Litchfield Park, Arizona. Applicant requests an amendment to a current permit for... following species within Texas: Bee Creek Cave harvestman (Texella reddelli) Bone Cave harvestman (Texella...

  17. EPA Office of Water (OW): Pollutant Discharge Permit Status

    Data.gov (United States)

    U.S. Environmental Protection Agency — U.S. States (Generalized) represents the 50 states and the District of Columbia of the United States joined with data from the NPDES Permit Backlog Report for the...

  18. 75 FR 14627 - Receipt of Applications for Permit

    Science.gov (United States)

    2010-03-26

    ... Zoological, LLC, Greenwich, CT; PRT-01671A The applicant requests a permit to import a female cheetah (Acrinonyx jubatus) from DeWildt Cheetah Breeding Centre, South Africa where the individual cheetah was...

  19. 75 FR 53689 - Issuance of an Experimental Use Permit

    Science.gov (United States)

    2010-09-01

    ... INFORMATION CONTACT: Gina Casciano, Biopesticides and Pollution Prevention Division (7511P), Office of..., Experimental use permits. Dated: August 19, 2010. W. Michael McDavit, Acting Director, Biopesticides and...

  20. Towards green construction

    International Nuclear Information System (INIS)

    Bajracharya, Bijaya B.; Shrestha, Prasanna M.

    2000-01-01

    Sustainability is the key to any development works. In the operation phase, hydro power is the most sustainable form of energy. However construction activities for the same power station are usually far from being green. The popular myth is that construction activity converts green into grey. Despite this popular myth, construction of a hydro power project in Nepal has made the project area greener than earlier during the construction phase itself. Choice of construction technology, appropriate level of environmental impact assessment, monitoring of environmental parameters along side the construction progress followed by mitigation at the right time; launching community development programmes side by side, having environmental specification in contractual documents and self-reliance to fulfill environmental obligations by contractors itself are the key factors in the environmental management within the construction activities. The main conclusions in the paper is the need to change the way to think about the project constraints

  1. How engineering facilitates construction

    International Nuclear Information System (INIS)

    Bailey, D.T.

    1976-01-01

    During a recent survey, construction personnel at jobsites were asked, ''what are the ten most unwanted construction problems.'' One reoccurring answer was design/construction incompatibility. In fact, many designs were impractical from a construction point of view. The reasons for this problem can be identified: Once construction begins, engineering is under intense pressure to issue new drawings to allow work to progress according to schedule. Other reasons may be the relative inexperience of the design personnel in construction, changes in design criteria and delays in receipt of supplier or client information. A description is presented of ways to solve this problem by obtaining construction expertise and input into the various phases and products of the engineering work

  2. Construction and study of exact ground states for a class of quantum antiferromagnets

    International Nuclear Information System (INIS)

    Fannes, M.

    1989-01-01

    Techniques of quantum probability are used to construct the exact ground states for a class of quantum spin systems in one dimension. This class in particular contains the antiferromagnetic models introduced by various authors under the name of VBS-models. The construction permits a detailed study of these ground states. (A.C.A.S.) [pt

  3. Auctioning emission permits in a leader-follower setting

    OpenAIRE

    Alvarez, Francisco; André, Francisco J.

    2015-01-01

    We analise emission permit auctions under leader-follower competition when the leader bids strategically and the follower acts as price-taker both at the auction and the secondary market. We obtain linear equilibrium bidding strategies for both firms and a unique equilibrium of the auction, which is optimal ex-post for the leader. Under specific distributional assumptions we conclude that the auction always awards less permits to the leader than the cost-effective amount. Our central result i...

  4. Hanford facility dangerous waste permit application, 242-A evaporator

    International Nuclear Information System (INIS)

    Engelmann, R.H.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, 'operating' treatment, storage, and/or disposal units, such as the 242-A Evaporator (this document, DOE/RL-90-42)

  5. Transportation of Large Wind Components: A Permitting and Regulatory Review

    Energy Technology Data Exchange (ETDEWEB)

    Levine, Aaron [National Renewable Energy Lab. (NREL), Golden, CO (United States); Cook, Jeff [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2016-09-01

    This report summarizes permitting and regulatory issues associated with transporting wind turbine blades, towers, and nacelles as well as large transformers (wind components). These wind components are commonly categorized as oversized and overweight (OSOW) and require specific permit approvals from state and local jurisdictions. The report was developed based on a Quadrennial Energy Review (QER) recommendation on logistical requirements for the transportation of 'oversized or high-consequence energy materials, equipment, and components.'

  6. Hanford facility dangerous waste permit application, PUREX storage tunnels

    International Nuclear Information System (INIS)

    Price, S.M.

    1997-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. The scope of the Unit-Specific Portion is limited to Part B permit application documentation submitted for individual, operating treatment, storage, and/or disposal units, such as the PUREX Storage Tunnels (this document, DOE/RL-90-24). Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the US Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needs defined by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. For ease of reference, the Washington State Department of Ecology alpha-numeric section identifiers from the permit application guidance documentation (Ecology 1996) follow, in brackets, the chapter headings and subheadings. A checklist indicating where information is contained in the PUREX Storage Tunnels permit application documentation, in relation to the Washington State Department of Ecology guidance, is located in the Contents Section. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in the General Information Portion). Wherever appropriate, the PUREX Storage Tunnels permit application documentation makes cross-reference to the General Information Portion, rather than duplicating text. Information provided in this PUREX Storage Tunnels permit application documentation is current as of April 1997

  7. 300 Area Treated Effluent Disposal Facility permit reopener run plan

    International Nuclear Information System (INIS)

    Olander, A.R.

    1995-01-01

    The 300 Area Treated Effluent Disposal Facility (TEDF) is authorized to discharge treated effluent to the Columbia River by National Pollutant Discharge Elimination System permit WA-002591-7. The letter accompanying the final permit noted the following: EPA recognizes that the TEDF is a new waste treatment facility for which full scale operation and effluent data has not been generated. The permit being issued by EPA contains discharge limits that are intended to force DOE's treatment technology to the limit of its capability.'' Because of the excessively tight limits the permit contains a reopener clause which may allow limits to be renegotiated after at least one year of operation. The restrictions for reopening the permit are as follows: (1) The permittee has properly operated and maintained the TEDF for a sufficient period to stabilize treatment plant operations, but has nevertheless been unable to achieve the limitation specified in the permit. (2) Effluent data submitted by the permittee supports the effluent limitation modifications(s). (3) The permittee has submitted a formal request for the effluent limitation modification(s) to the Director. The purpose of this document is to guide plant operations for approximately one year to ensure appropriate data is collected for reopener negotiations

  8. Group NPDES stormwater permit application: The Conoco experience

    International Nuclear Information System (INIS)

    Holler, J.D.

    1993-01-01

    The US Environmental Protection Agency (USEPA) has reported that stormwater runoff is a major cause of pollution and use impairment to waters of the nation. Diffuse pollution sources (stormwater runoff) are increasingly important as controls for industrial process dischargers. On November 16, 1990 the Federal Clean Water Act National Pollutant Discharge Elimination System (NPDES) rules governing the discharge of stormwater were published (56 FR 40948). These rules potentially affect every type of business enterprise conducting work ''associated with industrial activity.'' Dischargers of stormwater associated with industrial activity ar required to either seek coverage under a federal or state general permit using notice of intent, apply for an individual permit, or apply for a permit through a two-part group application process. Conoco, Inc. Supply and Transportation (S and T) elected the latter alternative to attempt to comply with these new evolving complex, broad-ranging permitting requirements. This paper discusses specific details of S and T's strategy, BMP designs, data acquisition activities, monitoring results, as well as economic impacts on the corporation as a result of storm water permit requirements. S and T operates approximately 170 unique wholly and jointly owned petroleum product storage and transport facilities across the nation. Approximately one-third of these facilities were subject to stormwater permit application requirements

  9. Construction time of PWRs

    International Nuclear Information System (INIS)

    Moreira, João M.L.; Gallinaro, Bruno; Carajilescov, Pedro

    2013-01-01

    The construction time of PWRs is studied considering published data about nuclear power plants in the world. For the 268 PWRs in operation in 2010, the mode of the construction time distribution is around 5–6 years, and 80% of the plants were built in less than 120 months. To circumvent the problem of comparing plants with different size we normalized the construction time to plants with 1 GW. We restricted the analysis to 201 PWRs which suffered less from external factors that were beyond the control of the management from 1965 to 2010. The results showed that the normalized construction time did not increase over the years and nor with the plants’ gross power level. The learning rate of the industry regarding normalized construction times showed a reduction with 95% confidence level of about 0.56±0.07 months for each 10 GW of installed capacity. Over the years the normalized construction time decreased and became more predictable. The data showed that countries with more centralized regulatory, construction and operation environments were able to build PWRs in shorter times. Countries less experienced with the nuclear technology built PWRs in longer times. - Highlights: ► The construction time of PWRs is analyzed based on historical data. ► Different factors affecting construction time are considered in the analyses. ► The normalized construction time of PWRs decreased with time and gross power level. ► Countries with more centralized institutions built PWRs more quickly

  10. 40 CFR 60.4123 - Hg budget permit contents and term.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 6 2010-07-01 2010-07-01 false Hg budget permit contents and term. 60... Coal-Fired Electric Steam Generating Units Permits § 60.4123 Hg budget permit contents and term. (a) Each Hg Budget permit will contain, in a format prescribed by the permitting authority, all elements...

  11. 78 FR 26384 - Endangered and Threatened Wildlife and Plants; Recovery Permit Applications

    Science.gov (United States)

    2013-05-06

    ... E. Freemont Lake Road, Pinedale, WY 82941 The applicant requests the renewal of an existing permit... the permit you are interested in by number (e.g., Permit No. TE-106387). Email: [email protected] . Please refer to the respective permit number (e.g., Permit No. TE-106387) in the subject line of the...

  12. Constructing Student Problems in Phylogenetic Tree Construction.

    Science.gov (United States)

    Brewer, Steven D.

    Evolution is often equated with natural selection and is taught from a primarily functional perspective while comparative and historical approaches, which are critical for developing an appreciation of the power of evolutionary theory, are often neglected. This report describes a study of expert problem-solving in phylogenetic tree construction.…

  13. Professional entrepreneurial identity construction

    DEFF Research Database (Denmark)

    Ramsgaard, Michael Breum

    The present study investigates the construction of a professional identity as an entrepreneur in a sample of people with educational background in nutrition and health. The study examines the connection between professional identity construction and entrepreneurial business emergence using...... ‘entrepreneurial preparedness’ as parameter. This research seeks to address the following questions: What significant components or characteristics do entrepreneurs rely on in the early processes of constructing an entrepreneurial identity....

  14. Imperfect construction of microclusters

    Science.gov (United States)

    Schneider, E.; Zhou, K.; Gilbert, G.; Weinstein, Y. S.

    2014-01-01

    Microclusters are the basic building blocks used to construct cluster states capable of supporting fault-tolerant quantum computation. In this paper, we explore the consequences of errors on microcluster construction using two error models. To quantify the effect of the errors we calculate the fidelity of the constructed microclusters and the fidelity with which two such microclusters can be fused together. Such simulations are vital for gauging the capability of an experimental system to achieve fault tolerance.

  15. VE of construction industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-10-15

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  16. VE of construction industry

    International Nuclear Information System (INIS)

    1987-10-01

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  17. HITACHI construction CAE system

    International Nuclear Information System (INIS)

    Yoshida, M.

    1994-01-01

    Construction and maintenance of nuclear power plants have important problems such as shortening the construction period and reducing the construction cost. Recently, the problem of insufficient construction labor has arisen, and as drastic strategic development has become a necessary counter-measure. The following four principles are included in the measures to be taken for efficient execution of the construction work within the short construction period: (1) reduction of on-site work and expansion of module block making, (2)improvement of the accuracy of the on-site work process, adjustment and expansion of the work in parallel with the construction process, (3)improvement of efficiency of the on-site work and mechanization and automation of the work, (4)improvement of the accuracy of the management of the construction. A three dimensional simulation system plant construction plan CAE, comprising five modules has been developed. A project management system was also developed to improve the accuracy and efficiency of management work in the field

  18. 40 CFR 60.3069 - Am I required to apply for and obtain a title V operating permit for my air curtain incinerator...

    Science.gov (United States)

    2010-07-01

    ... title V operating permit for my air curtain incinerator that burns only wood waste, clean lumber, and... and Compliance Times for Other Solid Waste Incineration Units That Commenced Construction On or Before December 9, 2004 Model Rule-Air Curtain Incinerators That Burn Only Wood Waste, Clean Lumber, and Yard...

  19. 40 CFR 62.15400 - When must I submit a title V permit application for my existing small municipal waste combustion...

    Science.gov (United States)

    2010-07-01

    ... application for my existing small municipal waste combustion unit? 62.15400 Section 62.15400 Protection of... Combustion Units Constructed on or Before August 30, 1999 Title V Requirements § 62.15400 When must I submit a title V permit application for my existing small municipal waste combustion unit? (a) You must...

  20. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Title V Operating Permit, statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Draft Part 71 Permit for Andeavor Field Services, LLC - Walker Hollow CS.

  1. Title V Operating Permit: XTO Energy, Inc. - River Bend Dehydration Site

    Science.gov (United States)

    Initial Title V Operating Permit (Permit Number: V-UO-000026-2011.00) and the Administrative Permit Record for the XTO Energy, Inc., River Bend Dehydration Site, located on the Uintah and Ouray Indian Reservation.

  2. Draft Title V Operating Permit: Andeavor Field Services, LLC - Walker Hollow Compressor Station

    Science.gov (United States)

    Draft Operating Permit (Permit Number: V-UO-000979-2017.00), statement of basis, public notice bulletin, and the administrative permit docket (application and other supporting documents) for the Andeavor Walker Hollow Compressor Station.

  3. 78 FR 56744 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-13

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of Permit Applications Received...

  4. 77 FR 38834 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2012-06-29

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978 AGENCY: National Science Foundation. ACTION: Notice of permit applications received...

  5. 78 FR 59728 - Notice of Permit Applications Received Under the Antarctic Conservation Act of 1978

    Science.gov (United States)

    2013-09-27

    ... requiring special protection. The regulations establish such a permit system to designate Antarctic... NATIONAL SCIENCE FOUNDATION Notice of Permit Applications Received Under the Antarctic... Foundation (NSF) is required to publish a notice of permit applications received to conduct activities...

  6. Permitted and forbidden sets in symmetric threshold-linear networks.

    Science.gov (United States)

    Hahnloser, Richard H R; Seung, H Sebastian; Slotine, Jean-Jacques

    2003-03-01

    The richness and complexity of recurrent cortical circuits is an inexhaustible source of inspiration for thinking about high-level biological computation. In past theoretical studies, constraints on the synaptic connection patterns of threshold-linear networks were found that guaranteed bounded network dynamics, convergence to attractive fixed points, and multistability, all fundamental aspects of cortical information processing. However, these conditions were only sufficient, and it remained unclear which were the minimal (necessary) conditions for convergence and multistability. We show that symmetric threshold-linear networks converge to a set of attractive fixed points if and only if the network matrix is copositive. Furthermore, the set of attractive fixed points is nonconnected (the network is multiattractive) if and only if the network matrix is not positive semidefinite. There are permitted sets of neurons that can be coactive at a stable steady state and forbidden sets that cannot. Permitted sets are clustered in the sense that subsets of permitted sets are permitted and supersets of forbidden sets are forbidden. By viewing permitted sets as memories stored in the synaptic connections, we provide a formulation of long-term memory that is more general than the traditional perspective of fixed-point attractor networks. There is a close correspondence between threshold-linear networks and networks defined by the generalized Lotka-Volterra equations.

  7. Double-shell tank system dangerous waste permit application

    International Nuclear Information System (INIS)

    1991-06-01

    This Double-Shell Tank System Dangerous Waste Permit Application should be read in conjunction with the 242-A Evaporator Dangerous Waste Permit Application and the Liquid Effluent Retention Facility Dangerous Waste Permit Application, also submitted on June 28, 1991. Information contained in the Double-Shell Tank System permit application is referenced in the other two permit applications. The Double-Shell Tank System stores and treats mixed waste received from a variety of sources on the Hanford Site. The 242-A Evaporator treats liquid mixed waste received from the double-shell tanks. The 242-A Evaporator returns a mixed-waste slurry to the double-shell tanks and generates the dilute mixed-waste stream stored in the Liquid Effluent Retention Facility. This report contains information on the following topics: Facility Description and General Provisions; Waste Characteristics; Process Information; Groundwater Monitoring; Procedures to Prevent Hazards; Contingency Plan; Personnel Training; Exposure Information Report; Waste Minimization Plan; Closure and Postclosure Requirements; Reporting and Recordkeeping; other Relevant Laws; and Certification. 150 refs., 141 figs., 118 tabs

  8. Air Permitting Implications of a Biorefinery Producing Raw Bio-Oil in Comparison with Producing Gasoline and Diesel Blendstocks

    Energy Technology Data Exchange (ETDEWEB)

    Bhatt, Arpit H [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Zhang, Yi Min [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-02-01

    A biorefinery, considered a chemical process plant under the Clean Air Act permitting program, could be classified as a major or minor source based on the size of the facility and magnitude of regulated pollutants emitted. Our previous analysis indicates that a biorefinery using fast pyrolysis conversion process to produce finished gasoline and diesel blendstocks with a capacity of processing 2,000 dry metric tons of biomass per day would likely be classified as a major source because several regulated pollutants (such as particulate matter, sulfur dioxide, nitrogen oxide) are estimated to exceed the 100 tons per year (tpy) major source threshold, applicable to chemical process plants. Being subject to a major source classification could pose additional challenges associated with obtaining an air permit in a timely manner before the biorefinery can start its construction. Recent developments propose an alternative approach to utilize bio-oil produced via the fast pyrolysis conversion process by shipping it to an existing petroleum refinery, where the raw bio-oil can be blended with petroleum-based feedstocks (e.g., vacuum gas oil) to produce gasoline and diesel blendstocks with renewable content. Without having to hydro-treat raw bio-oil, a biorefinery is likely to reduce its potential-to-emit to below the 100 tpy major source threshold, and therefore expedite its permitting process. We compare the PTE estimates for the two biorefinery designs with and without hydrotreating of bio-oils and examine the air permitting implications on potential air permit classification and discuss the best available control technology requirements for the major source biorefinery utilizing hydrotreating operation. Our analysis is expected to provide useful information to new biofuel project developers to identify opportunities to overcome challenges associated with air permitting.

  9. Nuclear power plants: construction status report, data as of 6/30/82

    International Nuclear Information System (INIS)

    1982-10-01

    This report is compiled by the Nuclear Regulatory Commission's Office of Resource Management to provide information necessary for monitoring progress of all nuclear power plants which have Construction Permits. The report includes data from utilities sponsoring the construction, as well as from NRC's Office of Inspection and Enforcement. This data is used to synchronize the licensing process with predicted fuel load dates for this central Federal Government presentation of commercial reactor construction

  10. Nuclear power plants: construction status report, data as of 03/31/82

    International Nuclear Information System (INIS)

    1982-06-01

    This report is compiled by the Nuclear Regulatory Commission's Office of Resource Management to provide information necessary for monitoring progress of all nuclear power plants which have Construction Permits. The report includes data from utilities sponsoring the construction, as well as from NRC's Office of Inspection and Enforcement. This data is used to synchronize the licensing process with predicted fuel load dates for this central Federal Government presentation of commercial reactor construction

  11. Wall Construction; Carpentry: 901892.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL.

    The curriculum guide outlines a course designed to provide instruction in floor and wall layout, and in the diverse methods and construction of walls. Upon completion of this course the students should have acquired a knowledge of construction plans and structural foundations in addition to a basic knowledge of mathematics. The course consists of…

  12. Safety in construction?

    NARCIS (Netherlands)

    Swuste, P.H.J.J.

    2013-01-01

    The available literature on Construction Safety is not very optimistic about the chances of evidence-based safety in the construction industry exerting a positive influence. Many articles indicate that the structures and processes that are designed to ensure safety in the industry are poor. Safety

  13. INDOT Construction Inspection Priorities

    Science.gov (United States)

    2012-05-01

    In the last decade, the Indiana Department of Transportation (INDOT) has experienced an increase in their construction projects (e.g., INDOTs : construction spending was $789 million in 2006 and increased to $1,081.4 million in 2010); while the le...

  14. Employment and winter construction

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Larsen, Jacob Norvig

    2011-01-01

    Reduced seasonal building activity in the construction sector is often assumed to be related to hard winter conditions for building activities and poor working conditions for construction workers, resulting in higher costs and poor quality of building products, particularly in the northern hemisp...... of contracts for workers is more likely to explain differences in seasonal activity than climatic or technological factors....

  15. Human Resource Construction

    Institute of Scientific and Technical Information of China (English)

    2015-01-01

    Centering on strategic objective of reform and development,CIAE formulated its objectives in human resource construction for the 13th Five-year Plan period,and achieved new apparent progress in human resource construction in 2015.1 Implementation of"LONGMA Project"

  16. Governmentalities of Construction

    DEFF Research Database (Denmark)

    Gottlieb, Stefan; Jensen, Jens Stissing

    2016-01-01

    In this paper, we apply Foucault’s concept of governmentality in a dual analysis of the formation and transformation of the construction sector and the construction worker. The governmentality concept is well-suited for such an analysis as it directs attention to the ways in which control is the ...

  17. Nuclear reactor constructions

    International Nuclear Information System (INIS)

    Baddley, A.H.

    1981-01-01

    A method of constructing a radiation shielding plug for use in the roof of the coolant containment vault of liquid metal cooled fast breeder reactors is described. The construction allows relative movement of that part of service cables and pipes which are carried by the fixed roof and that part which is carried by the rotatable plug. (U.K.)

  18. Constructional and Conceptual Composition

    Science.gov (United States)

    Dodge, Ellen Kirsten

    2010-01-01

    Goldberg's (1995) recognition that, in addition to various word-level constructions, sentences also instantiate meaningful argument structure constructions enables a non-polysemy-based analysis of various verb 'alternations' (Levin 1993). In such an analysis, meaning variations associated with the use of the same verb in different argument…

  19. Personal Usability Constructs

    DEFF Research Database (Denmark)

    Hertzum, Morten; Clemmensen, Torkil; Hornbæk, Kasper

    2011-01-01

    Whereas the concept of usability is predominantly defined analytically, people relate to systems through personal usability constructs. Based on 48 repertory-grid interviews, this study investigates how such personal constructs are affected by two factors crucial to the international development...

  20. Industrialization for sustainable construction?

    NARCIS (Netherlands)

    Egmond - de Wilde De Ligny, van E.L.C.; Barrett, P; Amaratunga, D.; Haigh, R; Keraminiyage, K.; Pathirage, C

    2010-01-01

    Sustainable construction (SuCo), which genesis dates in the early 1990’s, advocates the creation and operation of a quality and healthy built environment based on resource efficiency, life cycle economics and ecological principles. (Kibert, 2003). Currently the Construction Industry does not meet

  1. 25 CFR 166.219 - How do I acquire a permit through negotiation?

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How do I acquire a permit through negotiation? 166.219 Section 166.219 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER GRAZING PERMITS Permit Requirements Obtaining A Permit § 166.219 How do I acquire a permit through negotiation? (a) Permits may be negotiated and granted by th...

  2. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  3. VENTILATION NEEDS DURING CONSTRUCTION

    International Nuclear Information System (INIS)

    C.R. Gorrell

    1998-01-01

    The purpose of this analysis is to determine ventilation needs during construction and development of the subsurface repository and develop systems to satisfy those needs. For this analysis, construction is defined as pre-emplacement excavation and development is excavation that takes place simultaneously with emplacement. The three options presented in the ''Overall Development and Emplacement Ventilation Systems'' analysis (Reference 5.5) for development ventilation will be applied to construction ventilation in this analysis as well as adding new and updated ventilation factors to each option for both construction and development. The objective of this analysis is to develop a preferred ventilation system to support License Application Design. The scope of this analysis includes: (1) Description of ventilation conditions; (2) Ventilation factors (fire hazards, dust control, construction logistics, and monitoring and control systems); (3) Local ventilation alternatives; (4) Global ventilation options; and (5) Evaluation of options

  4. Allocation of emission permits with leakage through capital markets

    International Nuclear Information System (INIS)

    Maestad, Ottar

    2007-01-01

    This paper analyses how tradable emission permits should be allocated to firms when capital is internationally mobile. When international environmental problems are attempted solved through uncoordinated policies between countries, it might be desirable for the home country to issue free emission permits in proportion to the use of capital in order to prevent leakage through international capital movements. The desirability of free emission permits will however be reduced if capital also can be employed in a domestic non-polluting sector. In this case, it may even be optimal to tax the use of capital in the polluting sector. It is also shown that it is always optimal to subsidise the use of capital in the polluting sector if the use of labour is taxed at an optimal rate. Finally, leakage does not affect the optimal domestic emission limit as long as appropriate capital subsidies and labour taxes are implementeed. (author)

  5. The American experience of negotiable permits to combat air pollution

    International Nuclear Information System (INIS)

    Gros, Ch.

    2001-01-01

    Negotiable permits have been used in various fields, but the system in which they have seen greatest use is undoubtedly the American system of negotiable permits to fight acid rain. Since the 1970's, the United States have introduced elements of flexibility into their policy for fighting atmospheric pollution. These elements have included the family of negotiable permits. However, it was only in 1990 during the vote to amend the law on air cleanliness that a genuine market for the rights to emit SO 2 was set up (taking effect on january 1. 1995). This article analyses this context in order to understand why and how such an instrument has been introduced, and goes on to present the results. (author)

  6. State Waste Discharge Permit application: 200-W Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations; the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-W Powerhouse Ash Pit. The 200-W Powerhouse Ash Waste Water discharges to the 200-W Powerhouse Ash Pit via dedicated pipelines. The 200-W Powerhouse Ash Waste Water is the only discharge to the 200-W Powerhouse Ash Pit. The 200-W Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  7. State Waste Discharge Permit application: 200-E Powerhouse Ash Pit

    Energy Technology Data Exchange (ETDEWEB)

    Atencio, B.P.

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations, the US Department and Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. This document constitutes the State Waste Discharge Permit application for the 200-E Powerhouse Ash Pit. The 200-E Powerhouse Ash Waste Water discharges to the 200-E Powerhouse Ash Pit via dedicated pipelines. The 200-E Ash Waste Water is the only discharge to the 200-E Powerhouse Ash Pit. The 200-E Powerhouse is a steam generation facility consisting of a coal-handling and preparation section and boilers.

  8. Hanford facility dangerous waste permit application, general information portion

    International Nuclear Information System (INIS)

    Hays, C.B.

    1998-01-01

    The Hanford Facility Dangerous Waste Permit Application is considered to be a single application organized into a General Information Portion (document number DOE/RL-91-28) and a Unit-Specific Portion. Both the General Information and Unit-Specific portions of the Hanford Facility Dangerous Waste Permit Application address the content of the Part B permit application guidance prepared by the Washington State Department of Ecology (Ecology 1996) and the U.S. Environmental Protection Agency (40 Code of Federal Regulations 270), with additional information needed by the Hazardous and Solid Waste Amendments and revisions of Washington Administrative Code 173-303. Documentation contained in the General Information Portion is broader in nature and could be used by multiple treatment, storage, and/or disposal units (e.g., the glossary provided in this report)

  9. 76 FR 50246 - Endangered and Threatened Wildlife and Plants; Permit Applications

    Science.gov (United States)

    2011-08-12

    ... species in the wild. Permit Application Number: TE212427. Applicant: Ecology and Environment, Inc... wild. Permit Application Number: TE48835A. Applicant: Applied Science & Technology, Inc., Brighton, MI...

  10. Construction in Occupied Spaces

    Directory of Open Access Journals (Sweden)

    Ward Andrew E.

    2017-06-01

    Full Text Available Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  11. Construction in Occupied Spaces

    Science.gov (United States)

    Ward, Andrew E.; Azhar, Salman; Khalfan, Malik

    2017-06-01

    Conducting construction activities in occupied environments presents a great challenge due to the additional logistical requirements and the presence of the building occupants. The aim of this research is to gather and evaluate the means and methods to successfully plan, manage, and execute construction activities in occupied spaces in an effort to provide consolidated industry tools and strategies for maintaining a schedule and minimizing the impact on the occupants. The methodology of the research utilizes an exploratory approach to gather qualitative data. The data was collected through interviews with industry professionals to identify industry best practices. The semi-structured interviews provided a platform for the documents, lessons learned, and the techniques and strategies used for occupied construction by the construction industry. The information obtained in the interview process identified six themes that are critical to achieving and maintaining quality in occupied construction. These themes of the schedule, cost, customer satisfaction, planning, fire/life safety and utilities, and contractor management are reviewed in detail, and the paper discusses how to manage each element. The analysis and extracted management techniques, procedures and strategies can be used by the construction industry for future projects by focusing on the critical aspects of occupied construction and the manner in which to succeed with it.

  12. Construction and Demolition Waste

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund; Andersen, L.

    2011-01-01

    Construction and demolition waste (C&D waste) is the waste generated during the building, repair, remodeling or removal of constructions. The constructions can be roads, residential housing and nonresidential buildings. C&D waste has traditionally been considered without any environmental problems...... should be managed accordingly. Another reason is that it has been documented that a large fraction of C&D waste (about 90 %) can be easily recycled and thus can conserve landfill capacity. C&D waste may conveniently be divided into three subcategories: Buildings, roads and excavations. This chapter...

  13. Construction program management

    CERN Document Server

    Delaney, Joseph

    2013-01-01

    Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method

  14. Sustainability Base Construction Update

    Science.gov (United States)

    Mewhinney, Michael

    2012-01-01

    Construction of the new Sustainability Base Collaborative support facility, expected to become the highest performing building in the federal government continues at NASA's Ames Research Center, Moffet Field, Calif. The new building is designed to achieve a platinum rating under the leadership in Energy and Environment Design (LEED) new construction standards for environmentally sustainable construction developed by the U. S. Green Building Council, Washington, D. C. When completed by the end of 2011, the $20.6 million building will feature near zero net energy consumption, use 90 percent less potable water than conventionally build buildings of equivalent size, and will result in reduced building maintenance costs.

  15. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  16. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  17. Construction Minerals Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes construction minerals operations in the United States. The data represent commodities covered by the Minerals Information Team (MIT) of the...

  18. Caltrans : construction manual

    Science.gov (United States)

    2009-08-01

    Caltrans intends this manual as a resource for all personnel engaged in contract administration. The manual establishes policies and procedures for the construction phase of Caltrans projects. However, this manual is not a contract document. It impos...

  19. Lead in Construction

    National Research Council Canada - National Science Library

    1993-01-01

    Although Occupational Safety and Health Administration (OSHA) regulations for occupational lead exposure have been in effect since 1971 for the construction and general industries, the agency regulations for general industry in 1978...

  20. On Construction Grammar

    Institute of Scientific and Technical Information of China (English)

    XIAO Kunxue

    2005-01-01

    Constructionist approach with its brand-new perspective has begun to demonstrate its dynamic power. This paper attempts to review the basic ideas, achievements and comparison with generative grammar of Construction Grammar and generalize some problems and future research prospects.

  1. Nuclear power plant construction

    International Nuclear Information System (INIS)

    Lima Moreira, Y.M. de.

    1979-01-01

    The legal aspects of nuclear power plant construction in Brazil, derived from governamental political guidelines, are presented. Their evolution, as a consequence of tecnology development is related. (A.L.S.L.) [pt

  2. Skin Problems in Construction

    Science.gov (United States)

    ... you work with… Wet cement or plaster Abrasive cleaners Paints Adhesives Chemical solvents These materials can contain ... health hazards construction workers face on the job. Production of this card was supported by Grant OH009762 ...

  3. Passive solar construction handbook

    Energy Technology Data Exchange (ETDEWEB)

    Levy, E.; Evans, D.; Gardstein, C.

    1981-08-01

    Many of the basic elements of passive solar design are reviewed. The unique design constraints presented in passive homes are introduced and many of the salient issues influencing design decisions are described briefly. Passive solar construction is described for each passive system type: direct gain, thermal storage wall, attached sunspace, thermal storage roof, and convective loop. For each system type, important design and construction issues are discussed and case studies illustrating designed and built examples of the system type are presented. Construction details are given and construction and thermal performance information is given for the materials used in collector components, storage components, and control components. Included are glazing materials, framing systems, caulking and sealants, concrete masonry, concrete, brick, shading, reflectors, and insulators. The Load Collector Ratio method for estimating passive system performance is appended, and other analysis methods are briefly summarized. (LEW)

  4. Photovoltaic roof construction

    Energy Technology Data Exchange (ETDEWEB)

    Hawley, W.W.

    1980-02-26

    In a batten-seam roof construction employing at least one photovoltaic cell module, the electrical conduits employed with the at least one photovoltaic cell module are disposed primarily under the battens of the roof.

  5. Ship construction and welding

    CERN Document Server

    Mandal, Nisith R

    2017-01-01

    This book addresses various aspects of ship construction, from ship types and construction materials, to welding technologies and accuracy control. The contents of the book are logically organized and divided into twenty-one chapters. The book covers structural arrangement with longitudinal and transverse framing systems based on the service load, and explains basic structural elements like hatch side girders, hatch end beams, stringers, etc. along with structural subassemblies like floors, bulkheads, inner bottom, decks and shells. It presents in detail double bottom construction, wing tanks & duct keels, fore & aft end structures, etc., together with necessary illustrations. The midship sections of various ship types are introduced, together with structural continuity and alignment in ship structures. With regard to construction materials, the book discusses steel, aluminum alloys and fiber reinforced composites. Various methods of steel material preparation are discussed, and plate cutting and form...

  6. Construction and material specification

    Science.gov (United States)

    2002-01-01

    These Construction and Material Specifications are written to the Bidder before award of the : Contract and to the Contractor after award of the Contract. The sentences that direct the Contractor to perform Work are written as commands. For example, ...

  7. 21 CFR 352.20 - Permitted combinations of active ingredients.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Permitted combinations of active ingredients. 352.20 Section 352.20 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... effective date was stayed until further notice. For the convenience of the user, the text is set forth as...

  8. 21 CFR 333.320 - Permitted combinations of active ingredients.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 5 2010-04-01 2010-04-01 false Permitted combinations of active ingredients. 333.320 Section 333.320 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN... Note: At 75 FR 9776, Mar. 4, 2010, § 333.320 was revised, effective Mar. 4, 2011. For the convenience...

  9. 77 FR 6816 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-02-09

    ... notification covers activities to be conducted by the applicant over a 5-year period. Applicant: Bar H Bar Land...: Bar H Bar Land & Cattle Company, Houston, TX; PRT-63872A The applicant requests a permit authorizing... covers activities to be conducted by the applicant over a 5-year period. Applicant: Diamond J Game Ranch...

  10. Resource Conservation and Recovery Act, Part B permit application

    International Nuclear Information System (INIS)

    1993-01-01

    This volume includes the following chapters: Waste Isolation Pilot Plant RCRA A permit application; facility description; waste analysis plan; groundwater monitoring; procedures to prevent hazards; RCRA contingency plan; personnel training; corrective action for solid waste management units; and other Federal laws

  11. 7 CFR 319.41-2 - Application for permits.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION... importation of any of the articles specified in § 319.41-1(b), shall first make application to the Plant Protection and Quarantine Programs for a permit, stating in the application the name and address of the...

  12. 7 CFR 319.55-2 - Application for permit.

    Science.gov (United States)

    2010-01-01

    ... rice hulls from any country, may be made to the Plant Protection and Quarantine Programs, indicating in... 7 Agriculture 5 2010-01-01 2010-01-01 false Application for permit. 319.55-2 Section 319.55-2 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION...

  13. 76 FR 57757 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2011-09-16

    ... a Federal permit is issued that allows such activities. The ESA law requires that we invite public... laws and regulations. We will not consider or include in our administrative record comments we receive....) held in zoos in the United States to the Department of Anthropology, University of Cambridge, Cambridge...

  14. 75 FR 82409 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2010-12-30

    ... reissuance of their permit for scientific research with two captive-born giant pandas (Ailuropoda melanoleuca... provisions of the USFWS Giant Panda Policy. The proposed research will cover all aspects of behavior, reproductive physiology, genetics, nutrition, and animal health and is a continuation of activities currently...

  15. 19 CFR 12.7 - Permits required for importation.

    Science.gov (United States)

    2010-04-01

    ... Department of Health and Human Services under the said act require that each container of milk or cream... THE TREASURY SPECIAL CLASSES OF MERCHANDISE Milk and Cream § 12.7 Permits required for importation. (a... Federal Import Milk Act, the importation into the United States of milk and cream is prohibited unless the...

  16. State waste discharge permit application, 200-E chemical drain field

    International Nuclear Information System (INIS)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field

  17. Potable Water Treatment Facility General Permit (PWTF GP) ...

    Science.gov (United States)

    2017-08-28

    The Final PWTF GP establishes permit eligibility conditions, Notice of Intent (NOI) requirements, effluent limitations, standards, prohibitions, and best management practices for facilities that discharge to waters in the Commonwealth of Massachusetts (including both Commonwealth and Indian country lands) and the State of New Hampshire.

  18. 77 FR 2037 - Marine Mammals; Photography Permit File No. 17032

    Science.gov (United States)

    2012-01-13

    ... filmmaker hopes to document the behavior of marine animals in the presence of a gray whale carcass. Filming... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA929 Marine Mammals; Photography Permit File No. 17032 AGENCY: National Marine Fisheries Service (NMFS), National...

  19. 77 FR 24470 - Marine Mammals; Photography Permit File No. 17032

    Science.gov (United States)

    2012-04-24

    ... behavior of marine animals in the presence of a gray whale carcass. Filming will occur between April and... DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration RIN 0648-XA929 Marine Mammals; Photography Permit File No. 17032 AGENCY: National Marine Fisheries Service (NMFS), National...

  20. 15 CFR 922.104 - Permit procedures and criteria.

    Science.gov (United States)

    2010-01-01

    ... management decisionmaking; (2) Intended to further the educational value of the Sanctuary and thereby enhance... RESOURCE MANAGEMENT NATIONAL MARINE SANCTUARY PROGRAM REGULATIONS Fagatele Bay National Marine Sanctuary... to which the conduct of any permitted activity may diminish or enhance the value of the Sanctuary as...

  1. 78 FR 42540 - Endangered and Threatened Species; Permits

    Science.gov (United States)

    2013-07-16

    ... to the disadvantage of the listed species, and that the terms and conditions of the permit were... UNIVERSITY 207948 3/4/2013 12/31/2017 WESTERN ECOSYSTEMS TECHNOLOGY, INC 050706 10/1/2012 12/31/2015 WESTERN...

  2. 75 FR 11193 - Endangered Wildlife and Plants; Permits

    Science.gov (United States)

    2010-03-10

    ...] Endangered Wildlife and Plants; Permits AGENCY: Fish and Wildlife Service, Interior. ACTION: Notice of... employees and their designated agents to conduct enhancement of survival activities for a plant that was recently added to the List of Endangered and Threatened Plants (Phyllostegia hispida). The Endangered...

  3. State Waste Discharge Permit application, 183-N Backwash Discharge Pond

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect groundwater would be subject to permitting under the structure of Chapter 173--216 (or 173--218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE91NM-177 requires a series of permitting activities for liquid effluent discharges. Liquid effluents on the Hanford Site have been classified as Phase I, Phase II, and Miscellaneous Streams. The Consent Order No. DE91NM-177 establishes milestones for State Waste Discharge Permit application submittals for all Phase I and Phase II streams, as well as the following 11 Miscellaneous Streams as identified in Table 4 of the Consent Order No. DE91NM-177.

  4. State waste discharge permit application, 200-E chemical drain field

    Energy Technology Data Exchange (ETDEWEB)

    1994-06-01

    As part of the Hanford Federal Facility Agreement and Consent Order negotiations (Ecology et al. 1994), the US Department of Energy, Richland Operations Office, the US Environmental Protection Agency, and the Washington State Department of Ecology agreed that liquid effluent discharges to the ground on the Hanford Site which affect groundwater or have the potential to affect ground would be subject to permitting under the structure of Chapter 173-216 (or 173-218 where applicable) of the Washington Administrative Code, the State Waste Discharge Permit Program. As a result of this decision, the Washington State Department of Ecology and the US Department of Energy, Richland Operations Office entered into Consent Order No. DE 91NM-177, (Ecology and DOE-RL 1991). The Consent Order No. DE 91NM-177 requires a series of permitting activities for liquid effluent discharges. This document presents the State Waste Discharge Permit (SWDP) application for the 200-E Chemical Drain Field. Waste water from the 272-E Building enters the process sewer line directly through a floor drain, while waste water from the 2703-E Building is collected in two floor drains, (north and south) that act as sumps and are discharged periodically. The 272-E and 2703-E Buildings constitute the only discharges to the process sewer line and the 200-E Chemical Drain Field.

  5. 77 FR 298 - Endangered Species Receipt of Applications for Permit

    Science.gov (United States)

    2012-01-04

    ... fruit bat (Pteropus rodricensis) Applicant: Disney's Animal Kingdom, Lake Buena Vista, FL; PRT-812907... applicant over a 5-year period. Applicant: Feld Entertainment Inc., Vienna, VA; PRT-702230 The applicant... Anderson, Hastings, NE; PRT-59366A The applicant requests a permit to import a sport-hunted trophy of one...

  6. 77 FR 17494 - Endangered Species; Receipt of Applications for Permit

    Science.gov (United States)

    2012-03-26

    ... be conducted by the applicant over a 5-year period. Applicant: Feld Entertainment, Inc., Vienna, VA... import of any potential progeny born while overseas. The permit numbers and animals are: Tigers: Julie... sport- hunted trophy of one male bontebok (Damaliscus pygargus pygargus) culled from a captive herd...

  7. 76 FR 33337 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-06-08

    ...: Lasthenia conjugens (Contra Costa goldfields), Arabis mcdonaldiana (McDonald's rock-cress), Calystegia... of receipt of permit applications; request for comment. SUMMARY: We, the U.S. Fish and Wildlife... received on or before July 8, 2011. ADDRESSES: Written data or comments should be submitted to the U.S...

  8. 76 FR 39888 - Endangered Species Recovery Permit Applications

    Science.gov (United States)

    2011-07-07

    ... (Sonoma alopecurus); Amsinckia grandiflora (large-flowered fiddleneck); Arabis mcdonaldiana (McDonald's... of receipt of permit applications; request for comment. SUMMARY: We, the U.S. Fish and Wildlife... received on or before August 8, 2011. ADDRESSES: Written data or comments should be submitted to the U.S...

  9. 18 CFR 415.32 - Permitted uses generally.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Permitted uses generally. 415.32 Section 415.32 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION... riding trails. (4) Uses such as lawns, gardens, parking areas and play areas. (b) Within the flood fringe...

  10. 76 FR 60933 - Antarctic Conservation Act Permit Applications

    Science.gov (United States)

    2011-09-30

    ... NATIONAL SCIENCE FOUNDATION Antarctic Conservation Act Permit Applications AGENCY: National... Conservation Act of 1978. DATES: Interested parties are invited to submit written data, comments, or views with... Regulation for conduct of a flight from South America, over the South Pole, landing at Teniente Marsh Base...

  11. Resource Conservation and Recovery Act, Part B, Permit Application

    International Nuclear Information System (INIS)

    1991-01-01

    This report is part of the permit application for the WIPP facility. Appendices are presented on the following: the design validation final report; sampling of volatile organic compounds which may be emitted from waste binss, site supplementary roof support system, and studies on wind and tornado probabilities

  12. 50 CFR 16.22 - Injurious wildlife permits.

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 1 2010-10-01 2010-10-01 false Injurious wildlife permits. 16.22 Section 16.22 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE INTERIOR TAKING, POSSESSION, TRANSPORTATION, SALE, PURCHASE, BARTER, EXPORTATION, AND IMPORTATION OF WILDLIFE AND...

  13. Starlight excitation of permitted lines in the Orion Nebula

    International Nuclear Information System (INIS)

    Grandi, S.A.

    1975-01-01

    From an idealized model of the Orion Nebula and from an analysis of line ratios it is shown that direct starlight excitation of the permitted O I line dominates over recombination and Lyman line fluorescence. The line strengths predicted by this mechanism agree reasonably well with those observed in the Orion Nebula. The application of direct starlight excitation to other ions is also discussed

  14. 76 FR 15992 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2011-03-22

    ...-106816 Applicant: Douglas High School, Douglas, Arizona. Applicant requests a new permit for holding a... (Gila pupurea) at Douglas High School, to establish, reestablish, or augment populations consistent with... salamander (Eurycea sosorum), San Marco salamander (Eurycea nana), Texas blind salamander (Typhlomolge...

  15. 50 CFR 13.21 - Issuance of permits.

    Science.gov (United States)

    2010-10-01

    ... material information required, or has made false statements as to any material fact, in connection with his... disqualification has been expressly waived by the Director in response to a written petition. (2) The revocation of..., as well as any other conditions deemed appropriate and included on the face of the permit at the...

  16. 40 CFR 146.9 - Criteria for establishing permitting priorities.

    Science.gov (United States)

    2010-07-01

    ....9 Criteria for establishing permitting priorities. In determining priorities for setting times for... priorities. 146.9 Section 146.9 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) WATER... (a), (c), (g) or § 144.22(f), the Director shall base these priorities upon consideration of the...

  17. 78 FR 31973 - Endangered and Threatened Species Permit Applications

    Science.gov (United States)

    2013-05-28

    ... O'odham Nation, Sells, Arizona. Applicant requests an amendment to a current permit for research and... (Herpailurus yagouaroundi), and ocelot (Leopardus pardalis) within Pima County, Tohono O'odham Nation, Arizona... and Wildlife Service, P.O. Box 1306, Room 6034, Albuquerque, NM 87103 at 505-248-6920. Please refer to...

  18. 40 CFR 266.102 - Permit standards for burners.

    Science.gov (United States)

    2010-07-01

    ... or industrial furnace downstream of the combustion zone and prior to release of stack gases to the... MANAGEMENT FACILITIES Hazardous Waste Burned in Boilers and Industrial Furnaces § 266.102 Permit standards for burners. (a) Applicability—(1) General. Owners and operators of boilers and industrial furnaces...

  19. 50 CFR 21.23 - Scientific collecting permits.

    Science.gov (United States)

    2010-10-01

    ... take, transport, or possess migratory birds, their parts, nests, or eggs for scientific research or... project involved; (4) Name and address of the public, scientific, or educational institution to which all... possessed under authority of a scientific collecting permit must be donated and transferred to the public...

  20. 50 CFR 21.12 - General exceptions to permit requirements.

    Science.gov (United States)

    2010-10-01

    ..., as amended (40 Stat. 755; 16 U.S.C. 703-(711), may, without a permit, take or otherwise acquire, hold in custody, transport, and dispose of migratory birds or their parts, nests, or eggs as necessary in performing their official duties. (b) Employees of certain public and private institutions: (b)(1) State game...