Construction Cost Management in Resource Based Economy
Elazzazy, Muhammad
2017-01-01
Resource Based Economy tested according to criteria formulated from the construction cost management best practices. A cost management plan modeled to demonstrate the possibility of construction management under a new socio-economic system, which counts the consumed natural resources by construction as the dry cost to the environment.
Internet-based Interactive Construction Management Learning System.
Sawhney, Anil; Mund, Andre; Koczenasz, Jeremy
2001-01-01
Describes a way to incorporate practical content into the construction engineering and management curricula: the Internet-based Interactive Construction Management Learning System, which uses interactive and adaptive learning environments to train students in the areas of construction methods, equipment and processes using multimedia, databases,…
Applying Sensor-Based Technology to Improve Construction Safety Management.
Zhang, Mingyuan; Cao, Tianzhuo; Zhao, Xuefeng
2017-08-11
Construction sites are dynamic and complicated systems. The movement and interaction of people, goods and energy make construction safety management extremely difficult. Due to the ever-increasing amount of information, traditional construction safety management has operated under difficult circumstances. As an effective way to collect, identify and process information, sensor-based technology is deemed to provide new generation of methods for advancing construction safety management. It makes the real-time construction safety management with high efficiency and accuracy a reality and provides a solid foundation for facilitating its modernization, and informatization. Nowadays, various sensor-based technologies have been adopted for construction safety management, including locating sensor-based technology, vision-based sensing and wireless sensor networks. This paper provides a systematic and comprehensive review of previous studies in this field to acknowledge useful findings, identify the research gaps and point out future research directions.
VALUE-BASED APPROACH TO MANAGING CURRENT ASSETS OF CORPORATE CONSTRUCTION COMPANIES
Directory of Open Access Journals (Sweden)
Galyna Shapoval
2017-09-01
Full Text Available In modern conditions of management, the value of an enterprise becomes the main indicator, which is learned not only by scientists, but also by owners of enterprise and potential investors. Current assets take a very important place among the factors that affect the value of an enterprise, so management of current assets becomes more acute from the point of their impact on enterprise value. The purpose of the paper is to develop a system of value-based management of corporate construction companies’ current assets. The main tasks are: the study of current assets impact on the value of corporate construction companies, the definition of value-based approach to managing current assets of corporate enterprises and development of value-based management system of corporate construction companies’ current assets by elements. General scientific and special research methods were used while writing the work. Value-based management of current assets involves value-based management of the elements of current assets. The value-based inventory management includes the following stages of management: the assessment of reliability and choice of supplier according to the criterion of cash flow maximization, the classification of stocks in management accounting according to the rhythm of supply and the establishment of periodicity of supplies in accordance with the needs of the construction process. The value-based management of accounts receivable includes the following stages of management: assessment of the efficiency of investment of working capital into accounts receivable, the assessment of customers' loyalty and the definition of credit conditions and monitoring of receivables by construction and debt instruments. Value-based cash management involves determining the required level of cash to ensure the continuity of the construction process, assessing the effectiveness of cash use according to the criterion of maximizing cash flow, as well as budget
Study of Collaborative Management for Transportation Construction Project Based on BIM Technology
Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng
2018-03-01
Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.
A BIM-based approach to reusing construction firm’s management information
Zhiliang Ma
2012-01-01
Nowadays most construction firms have begun to use information management systems in their business to work more efficiently. At the same time, a lot of management information is being accumulated and some of the information can be reused to support the decision-making. Up to now, the information has not been reused so effectively in construction firms as expected. This paper introduces a new approach to reusing construction firm’s management information, which is based on BIM (Building Inf...
Document management in engineering construction
International Nuclear Information System (INIS)
Liao Bing
2008-01-01
Document management is one important part of systematic quality management, which is one of the key factors to ensure the construction quality. In the engineering construction, quality management and document management shall interwork all the time, to ensure the construction quality. Quality management ensures that the document is correctly generated and adopted, and thus the completeness, accuracy and systematicness of the document satisfy the filing requirements. Document management ensures that the document is correctly transferred during the construction, and various testimonies such as files and records are kept for the engineering construction and its quality management. This paper addresses the document management in the engineering construction based on the interwork of the quality management and document management. (author)
Pellicer, Eugenio; Teixeira, José C; Moura, Helder P; Catalá, Joaquín
2014-01-01
The management of construction projects is a wide ranging and challenging discipline in an increasingly international industry, facing continual challenges and demands for improvements in safety, in quality and cost control, and in the avoidance of contractual disputes. Construction Management grew out of a Leonardo da Vinci project to develop a series of Common Learning Outcomes for European Managers in Construction. Financed by the European Union, the project aimed to develop a library of basic materials for developing construction management skills for use in a pan-European context. Focused exclusively on the management of the construction phase of a building project from the contractor's point of view, Construction Management covers the complete range of topics of which mastery is required by the construction management professional for the effective delivery of new construction projects. With the continued internationalisation of the construction industry, Construction Management will be required rea...
A BIM-based approach to reusing construction firm’s management information
Directory of Open Access Journals (Sweden)
Zhiliang Ma
2012-12-01
Full Text Available Nowadays most construction firms have begun to use information management systems in their business to work more efficiently. At the same time, a lot of management information is being accumulated and some of the information can be reused to support the decision-making. Up to now, the information has not been reused so effectively in construction firms as expected. This paper introduces a new approach to reusing construction firm’s management information, which is based on BIM (Building Information Modeling technology. In the paper, the current approaches are reviewed at first, and then the framework of the new approach is described. Next, the key issues of the new approach are clarified. Finally, a use case of the new approach is demonstrated. It is concluded that the new approach can be used in construction firms to better reuse the accumulated management information.
Simulation-based modeling of building complexes construction management
Shepelev, Aleksandr; Severova, Galina; Potashova, Irina
2018-03-01
The study reported here examines the experience in the development and implementation of business simulation games based on network planning and management of high-rise construction. Appropriate network models of different types and levels of detail have been developed; a simulation model including 51 blocks (11 stages combined in 4 units) is proposed.
Collaborative Management of Complex Major Construction Projects: AnyLogic-Based Simulation Modelling
Directory of Open Access Journals (Sweden)
Na Zhao
2016-01-01
Full Text Available Complex supply chain system collaborative management of major construction projects effectively integrates the different participants in the construction project. This paper establishes a simulation model based on AnyLogic to reveal the collaborative elements in the complex supply chain management system and the modes of action as well as the transmission problems of the intent information. Thus it is promoting the participants to become an organism with coordinated development and coevolution. This study can help improve the efficiency and management of the complex system of major construction projects.
Research on information models for the construction schedule management based on the IFC standard
Directory of Open Access Journals (Sweden)
Weirui Xue
2015-05-01
Full Text Available Purpose: The purpose of this article is to study the description and extension of the Industry Foundation Classes (IFC standard in construction schedule management, which achieves the information exchange and sharing among the different information systems and stakeholders, and facilitates the collaborative construction in the construction projects. Design/methodology/approach: The schedule information processing and coordination are difficult in the complex construction project. Building Information Modeling (BIM provides the platform for exchanging and sharing information among information systems and stakeholders based on the IFC standard. Through analyzing the schedule plan, implementing, check and control, the information flow in the schedule management is reflected based on the IDEF. According to the IFC4, the information model for the schedule management is established, which not only includes the each aspect of the schedule management, but also includes the cost management, the resource management, the quality management and the risk management. Findings: The information requirement for the construction schedule management can be summarized into three aspects: the schedule plan information, the implementing information and the check and control information. The three aspects can be described through the existing and extended entities of IFC4, and the information models are established. Originality/value: The main contribution of the article is to establish the construction schedule management information model, which achieves the information exchange and share in the construction project, and facilitates the development of the application software to meet the requirements of the construction project.
An Agent Based Approach for Project Management in Construction
Sencer, Safiye; Turgay, Tahsin
2013-01-01
Project management has an important role in terms of time, cost and flexibility. An agentbased architecture provides additional robustness, scalability, flexibility that is particularly appropriate for problems with a dynamic and distributed nature. Integrated agent based project management covers design and construction planning. It is combined with plan execution, tolerating both the design and plan, which may be changed as necessary. In this reason, the decision making process requires tha...
Advanced construction management for lunar base construction - Surface operations planner
Kehoe, Robert P.
1992-01-01
The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.
Construction of APR1000 nuclear power information management system based on international standards
International Nuclear Information System (INIS)
Choi, Seung Hwan; Song, Deok Yong; Han, Byung Sub; An, Kyung Ik; Hwang, Jin Sang
2010-01-01
In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model
Construction of APR1000 nuclear power information management system based on international standards
Energy Technology Data Exchange (ETDEWEB)
Choi, Seung Hwan [Korea Electric Power Research Institute, Daejeon (Korea, Republic of); Song, Deok Yong; Han, Byung Sub [Enesys Co., Daejeon (Korea, Republic of); An, Kyung Ik; Hwang, Jin Sang [PartDB Co., Daejeon (Korea, Republic of)
2010-10-15
In recent years, due to speedy rise of international oil prices, orders of nuclear power plant construction have been in progress by many countries to solve the stable supply of power. Our country has continued to perform nuclear power construction. As only a few developed countries like Japan and European countries have its own nuclear power construction technology, competition among them is keen. Our country has awarded the contract of UAE nuclear power plants based on the accumulated nuclear power plant construction technologies so far. In this regard, KEPCO has recognized the needs of information management system to manage nuclear power information and proceeded the implementation of nuclear power information management system for export-model
Directory of Open Access Journals (Sweden)
Yongho Ko
2017-04-01
Full Text Available Precise and accurate prediction models for duration and cost enable contractors to improve their decision making for effective resource management in terms of sustainability in construction. Previous studies have been limited to cost-based estimations, but this study focuses on a material-based progress management method. Cost-based estimations typically used in construction, such as the earned value method, rely on comparing the planned budget with the actual cost. However, accurately planning budgets requires analysis of many factors, such as the financial status of the sectors involved. Furthermore, there is a higher possibility of changes in the budget than in the total amount of material used during construction, which is deduced from the quantity take-off from drawings and specifications. Accordingly, this study proposes a material-based progress management methodology, which was developed using different predictive analysis models (regression, neural network, and auto-regressive moving average as well as datasets on material and labor, which can be extracted from daily work reports from contractors. A case study on actual datasets was conducted, and the results show that the proposed methodology can be efficiently used for progress management in construction.
Ding, Zhikun; Yi, Guizhen; Tam, Vivian W Y; Huang, Tengyue
2016-05-01
A huge amount of construction waste has been generated from increasingly higher number of construction activities than in the past, which has significant negative impacts on the environment if they are not properly managed. Therefore, effective construction waste management is of primary importance for future sustainable development. Based on the theory of planned behaviors, this paper develops a system dynamic model of construction waste reduction management at the construction phase to simulate the environmental benefits of construction waste reduction management. The application of the proposed model is shown using a case study in Shenzhen, China. Vensim is applied to simulate and analyze the model. The simulation results indicate that source reduction is an effective waste reduction measure which can reduce 27.05% of the total waste generation. Sorting behaviors are a premise for improving the construction waste recycling and reuse rates which account for 15.49% of the total waste generated. The environmental benefits of source reduction outweigh those of sorting behaviors. Therefore, to achieve better environmental performance of the construction waste reduction management, attention should be paid to source reduction such as low waste technologies and on-site management performance. In the meantime, sorting behaviors encouragement such as improving stakeholders' waste awareness, refining regulations, strengthening government supervision and controlling illegal dumping should be emphasized. Copyright © 2016 Elsevier Ltd. All rights reserved.
Abbott, James F.
This article provides a detailed discussion of a team approach to building that involves a construction manager, an architect, and a contractor. Bidding methods are outlined; the major components in construction management -- value engineering and fast track scheduling -- and the use of performance specifications are discussed. The construction…
Construction program management
Delaney, Joseph
2013-01-01
Although construction is one of the largest industries in the United States, it lags behind other industries in its implementation of modern management techniques such as those contained in the Standard for Program Management (the Standard) by the Project Management Institute (PMI(R)). Construction Program Management details the successful use of the PMI(R) approach for the construction of capital programs. It demonstrates, through case studies, how implementation of PMI's set of tools and techniques can improve the chances of program success. Exploring tactical and strategic management method
TPX tokamak construction management
International Nuclear Information System (INIS)
Knutson, D.; Kungl, D.; Seidel, P.; Halfast, C.
1995-01-01
A construction management contract normally involves the acquisition of a construction management firm to assist in the design, planning, budget conformance, and coordination of the construction effort. In addition the construction management firm acts as an agent in the awarding of lower tier contracts. The TPX Tokamak Construction Management (TCM) approach differs in that the construction management firm is also directly responsible for the assembly and installation of the tokamak including the design and fabrication of all tooling required for assembly. The Systems Integration Support (SIS) contractor is responsible for the architect-engineering design of ancillary systems, such as heating and cooling, buildings, modifications and site improvements, and a variety of electrical requirements, including switchyards and >4kV power distribution. The TCM will be responsible for the procurement of materials and the installation of the ancillary systems, which can either be performed directly by the TCM or subcontracted to a lower tier subcontractor. Assurance that the TPX tokamak is properly assembled and ready for operation when turned over to the operations team is the primary focus of the construction management effort. To accomplish this a disciplined constructability program will be instituted. The constructability effort will involve the effective and timely integration of construction expertise into the planning, component design, and field operations. Although individual component design groups will provide liaison during the machine assembly operations, the construction management team is responsible for assembly
Institute of Scientific and Technical Information of China (English)
2010-01-01
The necessity to construct the network management information system of 3PLs agricultural supply chain is analyzed,showing that 3PLs can improve the overall competitive advantage of agricultural supply chain.3PLs changes the homogeneity management into specialized management of logistics service and achieves the alliance of the subjects at different nodes of agricultural products supply chain.Network management information system structure of agricultural products supply chain based on 3PLs is constructed,including the four layers (the network communication layer,the hardware and software environment layer,the database layer,and the application layer) and 7 function modules (centralized control,transportation process management,material and vehicle scheduling,customer relationship,storage management,customer inquiry,and financial management).Framework for the network management information system of agricultural products supply chain based on 3PLs is put forward.The management of 3PLs mainly includes purchasing management,supplier relationship management,planning management,customer relationship management,storage management and distribution management.Thus,a management system of internal and external integrated agricultural enterprises is obtained.The network management information system of agricultural products supply chain based on 3PLs has realized the effective sharing of enterprise information of agricultural products supply chain at different nodes,establishing a long-term partnership revolving around the 3PLs core enterprise,as well as a supply chain with stable relationship based on the supply chain network system,so as to improve the circulation efficiency of agricultural products,and to explore the sales market for agricultural products.
Healthcare managers' construction of the manager role in relation to the medical profession.
von Knorring, Mia; Alexanderson, Kristina; Eliasson, Miriam A
2016-05-16
Purpose - The purpose of this paper is to explore how healthcare managers construct the manager role in relation to the medical profession in their organisations. Design/methodology/approach - In total, 18 of Sweden's 20 healthcare chief executive officers (CEOs) and 20 clinical department managers (CDMs) were interviewed about their views on management of physicians. Interviews were performed in the context of one aspect of healthcare management; i.e., management of physicians' sickness certification practice. A discourse analysis approach was used for data analysis. Findings - Few managers used a management-based discourse to construct the manager role. Instead, a profession-based discourse dominated and managers frequently used the attributes "physician" or "non-physician" to categorise themselves or other managers in their managerial roles. Some managers, both CEOs and CDMs, shifted between the management- and profession-based discourses, resulting in a kind of "yes, but […]" approach to management in the organisations. The dominating profession-based discourse served to reproduce the power and status of physicians within the organisation, thereby rendering the manager role weaker than the medical profession for both physician and non-physician managers. Research limitations/implications - Further studies are needed to explore the impact of gender, managerial level, and basic profession on how managers construct the manager role in relation to physicians. Practical implications - The results suggest that there is a need to address the organisational conditions for managers' role taking in healthcare organisations. Originality/value - Despite the general strengthening of the manager position in healthcare through political reforms during the last decades, this study shows that a profession-based discourse clearly dominated in how the managers constructed the manager role in relation to the medical profession on the workplace level in their organisations.
Enhancing knowledge sharing management using BIM technology in construction.
Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui
2013-01-01
Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.
The construction project manager in South Africa: Analysis of ...
African Journals Online (AJOL)
Journal Home > Vol 22, No 1 (2015) > ... Construction project managers in the built environment come from various backgrounds and knowledge bases; therefore, the project managers' project ... Industry-specific guidelines for construction project management (PMBOK and SACPCMP) were obtained and analysed.
Web-based Construction Information Management System
Directory of Open Access Journals (Sweden)
David Scott
2012-11-01
Full Text Available Centralised information systems that are accessible to all parties in a construction project are powerful tools in the quest to improve efficiency and to enhance the flow of information within the construction industry. This report points out the maturity of the necessary IT technology, the availability and the suitability of existing commercial products.Some of these products have been studied and analysed. An evaluation and selection process based on the functions offered in the products and their utility is presented. A survey of local construction personnel has been used to collect typical weighting data and performance criteria used in the evaluation process.
International Nuclear Information System (INIS)
Lesko, K.F.; Berriochoa, M.V.
2010-01-01
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted
Energy Technology Data Exchange (ETDEWEB)
LESKO KF; BERRIOCHOA MV
2010-02-26
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are
Relationship between time management in construction industry and project management performance
Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin
2016-08-01
Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.
Operations management for construction
March, Chris
2009-01-01
Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...
Directory of Open Access Journals (Sweden)
A.Q. Adeleke
2018-03-01
Full Text Available Background: Substantial empirical research has shown conflicting results regarding the influence of organizational external factors on construction risk management, suggesting the necessity to introduce a moderator into the study. The present research confirmed whether rules and regulations matter on the relationships between organizational external factors and construction risk management. Methods: Based on discouragement and organizational control theory, this research examined the effects of organizational external factors and rules and regulations on construction risk management among 238 employees operating in construction companies in Abuja and Lagos, Nigeria. A personally administered questionnaire was used to acquire the data. The data were analyzed using partial least squares structural equation modeling. Results: A significant positive relationship between organizational external factors and construction risk management was asserted. This study also found a significant positive relationship between rules and regulations and construction risk management. As anticipated, rules and regulations were found to moderate the relationship between organizational external factors and construction risk management, with a significant positive result. Similarly, a significant interaction effect was also found between rules and regulations and organizational external factors. Implications of the research from a Nigerian point of view have also been discussed. Conclusion: Political, economy, and technology factors helped the construction companies to reduce the chance of risk occurrence during the construction activities. Rules and regulations also helped to lessen the rate of accidents involving construction workers as well as the duration of the projects. Similarly, the influence of the organizational external factors with rules and regulations on construction risk management has proven that most of the construction companies that implement the
Construction Management of Electromechanical Engineering Project in Petrochemical Construction
Directory of Open Access Journals (Sweden)
Xi Tao
2017-03-01
Full Text Available Petrochemical industry as a basic industry, occupies a pivotal position in the national economy, with the continuous development of science and technology, electromechanical automation in the petrochemical industry has been widely used to save a lot of labor but also greatly improve the oil Chemical industry production efficiency. Therefore, in the construction of petrochemical industry, mechanical and electrical engineering as part of it. It plays a vital role. Petrochemical industry with the production of high temperature and high pressure and flammable and explosive gas, can strengthen the construction of mechanical and electrical engineering specialization and construction management of scientific, has become the relationship between the smooth development of mechanical and electrical engineering and engineering quality of the key, A direct impact on the petrochemical construction of the overall construction quality. To this end, it is necessary for the construction of petrochemical construction of electromechanical engineering construction management to promote the construction of mechanical and electrical engineering management level gradually increased. This article on the machine Electric engineering project construction management were discussed with a view to the petrochemical construction in the relevant aspects of the need to provide reference for reference.
Discursive construction of polyphony in healthcare management.
Hujala, Anneli; Rissanen, Sari
2012-01-01
The aim of the paper is to understand and define how the polyphony of management is constructed in interaction and to describe this through concrete management meeting cases. Polyphony refers to the diverse voices of various organization members, and how these voices are present, disclosed and utilized in management. The study is based on the social constructionist and discursive perspectives of management, which question the traditional, individualistic approaches of management. The issue was examined through a qualitative case study by analysing the micro-level management discourse in three healthcare organizations. Discursive practices that enhance or inhibit polyphony are often unnoticed and unconscious. Key moments of management discourse are an example of unconscious mundane practices through which members of organizations construct the reality of management. The empirical results are locally contextual. In the future, research will be able to apply the approach to diverse contexts as well as link micro-level discourses to the construction of broader health and social management discourses. The paper increases the understanding of how to enhance participation and staff contribution, and how to utilize the knowledge of all members of the organization. Both managers and other staff members are fully involved in the social construction of management. Micro-level discourse should be paid attention to in management work as well as in the education of managers and staff. The study increases the understanding of micro-level issues of management and challenges the conventional, taken-for-granted assumptions behind organization and management theories.
MANAGEMENT OF RISKS BASED ON INTERACTION BETWEEN CONSTRUCTION EXPERT AND CUSTOMER ORGANIZATION
Directory of Open Access Journals (Sweden)
Александр Васильевич Харитонович
2016-02-01
Full Text Available The paper describes problems connected to management of risk and key characteristics of interaction of construction expert and organization-customer of expert services. We have conducted the analysis of different schemes used for management of risk, their advantages and disadvantages. In addition authors describe the main opportunities that appear in the organization as a result of the systematic engagement of an external expert at different stages of investment and construction project (getting recommendations aimed at improving of the organization adaptability to changes and risks; improving the efficiency of management of investment and construction projects etc..
Enterprise risk management in international construction operations
Zhao, Xianbo; Low, Sui Pheng
2015-01-01
This book provides readers an understanding of the implementation of Enterprise Risk Management (ERM) for international construction operations. In an extended case study, it primarily focuses on Chinese construction firms (CCFs) based in Singapore. In this regard, the book explains the differences and similarities between Risk Management (RM), Project Risk Management (PRM) and ERM in the construction industry, and examines their linkages for international construction operations in a broader context. The explanation elaborates on how companies may adopt and implement RM, PRM and ERM as appropriate in their various operations, both in their home market as well as in overseas host markets. The book also reviews the whole spectrum of work relating to organizational behavior (OB) as one of the key underpinnings for companies to evaluate and implement ERM. It will benefit practitioners from the industry as well as academics interested in the implementation of ERM practices in international construction operat...
Innovative quality management practices in the Dutch construction industry
Bossink, B.A.G.
2002-01-01
Quality management practices do support the management of strategically important innoυation processes. This conclusion is based on empirical research in the Dutch construction industry. A large-scale innovative construction project is intensively studied during a three-year period. The quality
Influential Factors Affecting Materials Management in Construction Projects
Directory of Open Access Journals (Sweden)
Jusoh Zairra Mat
2017-12-01
Full Text Available Construction projects are more often than not plagued by poor performances such as delays, cost overrun, low productivity, construction wastes and compromised quality. Amongst the critical contributory factors of poor project performances, is the ineffectiveness of materials management occurring in the construction sites. Indeed, materials management is a very important component for construction projects. However, there are only limited numbers of research available regarding this topic. Thus, this research focuses its study on materials management, specifically in identifying the influential factors that affect materials management in the construction project activities. Literatures from books, journal articles and conference papers related to poor project performances and materials management have been reviewed. Consequently, this study sorted the salient influential factors and categorized them based on their specific group. Out of 47 factors identified, they are classified into 8 groups. They are (1 site condition; (2 planning and handling on site; (3 management; (4 materials; (5 supplier and manufacturer default; (6 transportation; (7 contractual; and (8 governmental interferences. In conclusion, this study contends that by identifying the influential factors affecting materials management, it will help construction players to avoid the occurrence of those factors and will minimize the negative impacts on the overall performance of construction projects. Hence, the handling-over of project will be according to schedule and not delayed by materials mismanagement.
DEFF Research Database (Denmark)
Sørensen, Kristian Birch; Christiansson, Per; Svidt, Kjeld
2009-01-01
early example) of an ICT system was carried out to identify and formalise user needs in relation to construction management based on virtual models and radio frequency identification (RFID). The prototype was developed to support working processes in real-time project progress management, quality...
Management of investment-construction projects basing on the matrix of key events
Directory of Open Access Journals (Sweden)
Morozenko Andrey Aleksandrovich
2016-11-01
Full Text Available The article considers the current problematic issues in the management of investment-construction projects, examines the questions of efficiency increase of construction operations on the basis of the formation of a reflex-adaptive organizational structure. The authors analyzed the necessity of forming a matrix of key events in the investment-construction project (ICP, which will create the optimal structure of the project, basing on the work program for its implementation. For convenience of representing programs of the project implementation in time the authors make recommendations to consolidate the works into separate, economically independent functional blocks. It is proposed to use an algorithm of forming the matrix of an investment-construction project, considering the economic independence of the functional blocks and stages of the ICP implementation. The use of extended network model is justified, which is supplemented by organizational and structural constraints at different stages of the project, highlighting key events fundamentally influencing the further course of the ICP implementation.
Construction Management Risk System (CMRS for Construction Management (CM Firms
Directory of Open Access Journals (Sweden)
Kyungmo Park
2017-02-01
Full Text Available After the global financial crisis of 2008, the need for risk management arose because it was necessary to minimize the losses in construction management (CM firms. This was caused by a decreased amount of orders in the Korean CM market, which intensified order competition between companies. However, research results revealed that risks were not being systematically managed owing to the absence of risk management systems. Thus, it was concluded that it was necessary to develop standard operating systems and implement risk management systems in order to manage risks effectively. Therefore, the purpose of this study was to develop a construction risk management system (CRMS for systematically managing risks. For this purpose, the field operation managers of CM firms were interviewed and surveyed in order to define risk factors. Upon this, a risk assessment priority analysis was performed. Finally, a risk management system that comprised seven modules and 20 sub-modules and was capable of responding systematically to risks was proposed. Furthermore, the effectiveness of this system was verified through on-site inspection. This system allows early response to risks, accountability verification and immediate response to legal disputes with clients by managing risk records.
Construction Manager or General Contractor?
McKinley, John
1991-01-01
Unlike the general contractor approach, the construction management firm acts on behalf of the school district in school construction. Examines the development and nature of construction management, and cites its advantages and disadvantages. (MLF)
Approach to improve construction management utilizing information technology
International Nuclear Information System (INIS)
Lee, Woo Bang; Moon, Jin Yeong
2003-01-01
Korea Hydro and Nuclear Power (KHNP) has been managed Nuclear Power Plant (NPP) construction projects including basic project planning, design, procurement, construction and start-up for nearly 30 years, and taken the leading role in the self-reliance program for constructing NPP. To maintain its leading position of construction technology and export it to other countries, it is more likely required to build the strong and competitive business management system to improve internal business efficiency and transparency, and also to respond to the change of external business circumstances such as electricity market opening. KHNP is implementing Enterprise Resource Planning (ERP) System as a business innovation tool to improve business efficiency, which changes the way of performing work from organizational system to process-oriented system in order to optimize the company resources to achieve above goals. This change should be made based on the results of performing Business Process Re-engineering (BPR) to maximize overall business efficiency. For the construction project management area, the establishment of Integrated Construction Information Sharing System based on Information Technology (IT) is the most important part. It makes possible to build collaboration system with 'Win-Win strategy' between the project owner and all related entities and to contribute to secure transparency and cut the project cost down. We would like to introduce our NPP Construction Project Management System, Infrastructure for Information System, Information Sharing System among construction related entities and Implementation Practices in this paper and also include the suggestions on our customary practice and subject that should be improved
Modern Methods for Cost Management in Construction Enterprises
Directory of Open Access Journals (Sweden)
Mesároš Peter
2015-06-01
Full Text Available Cost management should be seen as an essential function of enterprises which perform their activities in current market environment. One of the main factors affecting the level of achieved profit and favourable market position is cost structure. The company's ability to obtain necessary and reliable information on their own cost, subsequent processing and effective cost management is crucial for achieving success. This study focuses on cost management and the use of modern methods of cost management in construction enterprises. The aim of this paper is to identify approaches to cost management in Slovak construction enterprises, based on own empirical research.
Construction Management Meets Today's Realities.
Day, C. William
1979-01-01
Construction management--the control of cost and time from concept through construction--grew out of a need to meet the realities of today's economy. A checklist of services a construction manager provides is presented. (Author/MLF)
Workshop presentation: research guidelines for Construction Management
Directory of Open Access Journals (Sweden)
Marco Alvise Bragadin
2013-10-01
Full Text Available Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1 Construction management: tools and methods to manage construction projects 2 environmental impact of construction projects 3 construction management and safety 4 project procurement 5 construction management for major public works & complex projects
International Nuclear Information System (INIS)
Mochida, T.; Hamamoto, M.; Nakamitsu, N.
2016-01-01
Full text: Hitachi-GE Nuclear Energy, Ltd. (HGNE) has more than 40 years BWR plants construction experience. The company continues to develop plant engineering system and plant construction systems based on the experience and the lessons learned. Currently, these systems are integrated in a variety of knowledge bases using the latest information technology (IT). Their performance is continuously validated in the recent NPP constructions. Typical examples are shown as case studies for knowledge management. These plant engineering and construction management systems are essential to achieve the on-time and on-budget-goals in NPP construction projects. (author
Research on Risk Manage of Power Construction Project Based on Bayesian Network
Jia, Zhengyuan; Fan, Zhou; Li, Yong
With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.
Effective Safety Management in Construction Project
Othman, I.; Shafiq, Nasir; Nuruddin, M. F.
2017-12-01
Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.
Construction Management--Exploding Some Myths.
Kluenker, Charles
1986-01-01
Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)
Construction history and construction management
International Nuclear Information System (INIS)
Agh, S.
1999-01-01
The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)
Workshop presentation: research guidelines for Construction Management
Marco Alvise Bragadin
2013-01-01
Nowadays the European economic system challenges the construction sector to take part to industrial recovery of western countries. In co-operation with the Construction Production research group of the Tampere University of of research about construction management tools and methods were detected. Research guidelines: 1) Construction management: tools and methods to manage construction projects 2) environmental impact of construction projects 3) construction management and safety 4) project p...
A theory of construction management?
Directory of Open Access Journals (Sweden)
Gerard de Valence
2012-09-01
Full Text Available The links between theory and construction management (CM, and for that matter construction economics (CE, are not strong (see de Valence 2011. This may be one of the reasons why they have not gained complete acceptance as academic disciplines and are not seen as distinct branches of economics and management respectively. Another reason may be that products and production (the focus of management and economic theories respectively are not the same as projects and project management in general, and construction projects and CM in particular.
Construction contracts law and management
Hughes, Will; Murdoch, John
2015-01-01
The fifth edition of this bestselling textbook has been thoroughly revised to provide the most up-to-date and comprehensive coverage of the legislation, administration and management of construction contracts. It now includes comparisons of working with JCT, NEC3, and FIDIC contracts throughout. Introducing this topic at the core of construction law and management, this book provides students with a one-stop reference on construction contracts. Significant new material covers: procurement tendering developments in dispute settlement commentary on all key legislation, case law and contract amendments In line with new thinking in construction management research, this authoritative guide is essential reading for every construction undergraduate and an extremely useful source of reference for practitioners.
International Nuclear Information System (INIS)
Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.
2010-01-01
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small
Energy Technology Data Exchange (ETDEWEB)
LESO KF; HAMILTON HM; FARNER M; HEATH T
2010-01-14
Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small
Construction quality management principles and good practice
Watson, Paul
2011-01-01
Quality management is essential for facilitating the competitiveness of modern day commercial organizations. Excellence in quality management is a requisite for construction organizations who seek to remain competitive and successful. The challenges presented by competitive construction markets and large projects that are dynamic and complex necessitate the adoption and application of quality management approaches. This textbook is written in line with the ISO 9001:2008 standard and provides a comprehensive evaluation of quality management systems and tools. Their effectiveness in achieving project objectives is explored, as well as applications in corporate performance enhancement. Both the strategic and operational dimensions of quality assurance are addressed by focusing on providing models of best practice. The reader is supported throughout by concise and clear explanations and with self-assessment questions. Practical case study examples show how various evaluative-based quality management systems and t...
Human Factors Simulation in Construction Management Education
Jaeger, M.; Adair, D.
2010-01-01
Successful construction management depends primarily on the representatives of the involved construction project parties. In addition to effective application of construction management tools and concepts, human factors impact significantly on the processes of any construction management endeavour. How can human factors in construction management…
Waste Management in Industrial Construction: Investigating Contributions from Industrial Ecology
Directory of Open Access Journals (Sweden)
Larissa A. R. U. Freitas
2017-07-01
Full Text Available The need for effective construction waste management is growing in importance, due to the increasing generation of construction waste and to its adverse impacts on the environment. However, despite the numerous studies on construction waste management, recovery of construction waste through Industrial Symbiosis and the adoption of other inter-firm practices, comprised within Industrial Ecology field of study, have not been fully explored. The present research aims to investigate Industrial Ecology contributions to waste management in industrial construction. The waste management strategies adopted in two industrial construction projects in Brazil are analyzed. The main waste streams generated are identified, recycling and landfilling diversion rates are presented and waste recovery through Industrial Symbiosis is discussed. A SWOT analysis was carried out. Results demonstrate that 9% of the waste produced in one of the projects was recovered through Industrial Symbiosis, while in the other project, waste recovery through Industrial Symbiosis achieved the rate of 30%. These data reveal Industrial Symbiosis’ potential to reduce landfilling of industrial construction wastes, contributing to waste recovery in construction. In addition, results show that industrial construction projects can benefit from the following synergies common in Industrial Ecology place-based approaches: centralized waste management service, shared waste management infrastructure and administrative simplification.
Conceptual Model for Systematic Construction Waste Management
Abd Rahim Mohd Hilmi Izwan; Kasim Narimah
2017-01-01
Development of the construction industry generated construction waste which can contribute towards environmental issues. Weaknesses of compliance in construction waste management especially in construction site have also contributed to the big issues of waste generated in landfills and illegal dumping area. This gives sign that construction projects are needed a systematic construction waste management. To date, a comprehensive criteria of construction waste management, particularly for const...
Higher Education Change and Its Managers: Alternative Constructions
Hotho, Sabine
2013-01-01
This article is based on a case study conducted in the context of UK higher education change. The article argues that "change" is a construct created in discourses of change policy and change management, and resulting in reductivist change management discourses which may impede rather than facilitate effective change management in the…
BIM for Construction Site Logistics Management
Directory of Open Access Journals (Sweden)
K. Whitlock
2018-01-01
Full Text Available Emerging Building Information Modelling (BIM has been hailed as a revolutionary technology and information management process that facilitates collaboration and more efficient design and construction processes through innovative 3D modelling software, open access to information and multidisciplinary integration. The deadline of compliance to BIM level 2 on all public sector centrally procured construction projects has expired leaving many construction firms anxious to adopt BIM. Most common documented applications of BIM have been in the areas of architectural and structural design, quantity surveying, construction project management, and sustainability with very limited peer-reviewed studies on construction logistics management. The aim of this study is to investigate how BIM can be applied to construction logistics management. This study adopts a desk-top approach, with articles sources from renowned scientific databases such as ScienceDirect, Google Scholar and Emerald. The study culminated in the identification of benefits and barriers of adopting BIM for construction logistics management. Given only a desk-top approach has been used, the recommendation for future study is to build on this to conduct an empirical study using both qualitative and quantitative data. This will provide an in-depth understanding of the use of BIM for construction logistics management and open opportunities for further research.
Estimation of construction waste generation and management in Thailand.
Kofoworola, Oyeshola Femi; Gheewala, Shabbir H
2009-02-01
This study examines construction waste generation and management in Thailand. It is estimated that between 2002 and 2005, an average of 1.1 million tons of construction waste was generated per year in Thailand. This constitutes about 7.7% of the total amount of waste disposed in both landfills and open dumpsites annually during the same period. Although construction waste constitutes a major source of waste in terms of volume and weight, its management and recycling are yet to be effectively practiced in Thailand. Recently, the management of construction waste is being given attention due to its rapidly increasing unregulated dumping in undesignated areas, and recycling is being promoted as a method of managing this waste. If effectively implemented, its potential economic and social benefits are immense. It was estimated that between 70 and 4,000 jobs would have been created between 2002 and 2005, if all construction wastes in Thailand had been recycled. Additionally it would have contributed an average savings of about 3.0 x 10(5) GJ per year in the final energy consumed by the construction sector of the nation within the same period based on the recycling scenario analyzed. The current national integrated waste management plan could enhance the effective recycling of construction and demolition waste in Thailand when enforced. It is recommended that an inventory of all construction waste generated in the country be carried out in order to assess the feasibility of large scale recycling of construction and demolition waste.
Podell, Harold J.
An introduction into the foundations of constructing a marketing data base is presented for the systems and marketing executives who are familiar with basic computer technology methods. The techniques and concepts presented are now being implemented by major organizations in the development of Management Information Systems (MIS). A marketing data…
Directory of Open Access Journals (Sweden)
Rodionova Svetlana Vladimirovna
2015-09-01
Full Text Available Planning and implementation of innovations on the microlevel of management and on the higher levels is a process of innovative projects portfolio implementation. Project management is aimed at some goal; therefore, defining the mission and aims of implementation is of primary importance. These are the part of the notion of development strategy of an enterprise. Creating a strategy for big construction holding companies is complicated by the necessity to account for different factors effecting each business-block and subsidiary companies. The authors specify an algorithm of development and implementation of the activity strategy of a big construction enterprise. A special importance of the correspondence of organizational management structure to the implemented strategy is shown. The innovative character of organizational structure change is justified. The authors offer methods to optimize the organizational management structure based on communication approach with the use of the elements graph theory. The offered methodological provisions are tested on the example of the Russian JSC “RZhDstroy”.
Technology Management on Large Construction Projects
DEFF Research Database (Denmark)
Bonke, Sten
The aim of this text is to discuss and to develop the concept of technology management in relation to the empirical field of construction projects. In the first of the two main sections central theories and their derived assertions concerning technology management criteria are summed up...... Fixed Link construction project. Finally on this basis the concluding remarks are pointing to the main theoretical problems and their practical implementations for the introduction of a technology management discipline in construction....... in a schematic theoretical framework. Hereafter the general characteristics of construction are examined from the point of view of serving as an empirical field for technology management analysis. In the second section the technology management theme is associated with the empirical properties of the Great Belt...
HSE management for AP1000 nuclear plant construction in EPC mode
International Nuclear Information System (INIS)
He Xiaogang; Wei Zhong
2010-01-01
As a new nuclear type, AP1000 will become the development direction of Chinese nuclear project. EPC General Contract mode is favored by nuclear owners both at home and abroad. Therefore, there is necessity for studying HSE management system and method suitable for AP1000 nuclear plant construction (ANPC) based on combination of AP1000 construction characters in EPC mode. This can not only ensure safety for ANPC but also positively promote national nuclear power development. For this reason, based on site HSE management of the first AP1000 nuclear plant under construction, HSE management system and method for ANPC in EPC mode was proposed after analysis of the character of EPC mode and ANPC character. It is hoped that it will be helpful for safe construction for ANPC. (authors)
How Can Lean Construction Improve the Daily Schedule of A Construction Manager?
Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin
2017-10-01
The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.
Industrial safety management with emphasis on construction safety
International Nuclear Information System (INIS)
Bhattacharya, R.
2016-01-01
Safety professionals, line managers, team leaders and concerned workers today eagerly discuss to find out the best safety approach for their workplace. Some research suggested that behaviour based and comprehensive ergonomics approaches lead in average reduction of injuries. This article discusses 'the science and engineering' behind improvement in industrial safety aspects particularly at construction sites through various safety approaches. A high degree of commitment to safety by the project management and rigorous and proactive measures are essential to prevent accidents at construction sites particularly in DAE units because of its sensitivity. Persistent efforts by the project management are needed for sustainable and committed safety at work place. The number of fatalities occurring from construction work in DAE units is sometimes disturbing and fall of person from height and through openings are the major causes for serious accidents
BIM-BASED SCHEDULING OF CONSTRUCTION
DEFF Research Database (Denmark)
Andersson, Niclas; Büchmann-Slorup, Rolf
2010-01-01
The potential of BIM is generally recognized in the construction industry, but the practical application of BIM for management purposes is, however, still limited among contractors. The objective of this study is to review the current scheduling process of construction in light of BIM...... and communicate. Scheduling on the detailed level, on the other hand, follows a stipulated approach to scheduling, i.e. the Last Planner System (LPS), which is characterized by involvement of all actors in the construction phase. Thus, the major challenge when implementing BIM-based scheduling is to improve...
Financial management of the construction company
Directory of Open Access Journals (Sweden)
Antosova, Karolina
2016-12-01
Full Text Available This paper informs about the financial management in the construction company. The work describes problems of the management, its tasks, goals, dependencies on the size of the construction company and progress in the construction production and also introduce topic of the risks in the construction business. Also controlling and reporting in the construction company together with basic tools are described in example of Metrostav a.s. in this work.
Construction project management handbook.
2012-03-01
The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...
On how to do construction management communications engineering
Institute of Scientific and Technical Information of China (English)
Zhang Zhi
2014-01-01
In the communication construction projects, improving the efectivenes of project management is an important part of the quality asurance program. The efectivenes of the communication and construction project management is afected by many factors. Therefore, the discusion of communication construction project management efectivenes is good for improving the quality of projects of great significance. This paper analyzes the characteristics and problems of communication construction projects, reflecting the importance of project management; then discused the factors afecting the efectivenes of project management; finaly targeted to improve the communication of construction project management efectivenes propose specific methods to ensure communication quality of construction projects.
Financial management of construction contractors.
Lacaria, Chris J.
1994-01-01
The scope of this paper is to discuss the financial management of a construction contractor. This paper attempts to approach this subject in a logical and systematic way. It communicates the importance of financial analysis and planning along with cash planning and profit planning. This report is not intended to be an all inclusive discussion of financial management in construction. Contractor's Financial Management is an extremely important subject. It has been told ...
Project Management Life Cycle Models to Improve Management in High-rise Construction
Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana
2018-03-01
The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.
Project Management Life Cycle Models to Improve Management in High-rise Construction
Directory of Open Access Journals (Sweden)
Burmistrov Andrey
2018-01-01
Full Text Available The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.
Constructing counterproductive behavior for supporting evironmental management system research
Tiarapuspa; Indyastuti, D. L.; Sari, W. R.
2018-01-01
This study aims to explore the definition of counterproductive behavior based on supervisors’ and sub ordinaries’ perceptions. Recently, environmental management system is a strategic tool to gain a competitive advantage. Human resource is the vital factor for successful environmental management system. Counterproductive behavior will destroy environmental management system. Unfortunately, the construct of counterproductive behavior is still debatable. Different culture show different dimensions and indicators of counterproductive behavior. The unclear construct results ambiguous empirical evidence. This study results that many items are included of counterproductive behavior, such as come late, impolite communication, playing gadget in working time, and the other negative behaviors.
Operations Management on The Construction Site
DEFF Research Database (Denmark)
Koch, Christian
2004-01-01
this as a refreshing renewal and improvement of practical operations management at the site. However this paper will present a first step of development of a new approach to operations management at the building site, which at the same time builds on, and criticize lean construction for missing the point...... of the knowledge economy. This endeavour is carried out in two ways. First by a reading of the operations management literature. Juxtaposing this with lean construction extentions and the critique developed by other scholars. And also drawing on human resource management approaches. Second through a series......” scheme. In both directions it is revealed that the human resource and knowledge element of building processes is largely left untouched by lean construction methods. It is suggested to introduce at least two more dimensions of operations management at the site than the ones offered in lean construction...
Exploitation of cloud computing in management of construction projects in Slovakia
Directory of Open Access Journals (Sweden)
Mandičák Tomáš
2016-12-01
Full Text Available The issue of cloud computing is a highly topical issue. Cloud computing represents a new model for information technology (IT services based on the exploitation of Web (it represents a cloud and other application platforms, as well as software as a service. In general, the exploitation of cloud computing in construction project management has several advantages, as demonstrated by several research reports. Currently, research quantifying the exploitation of cloud computing in the Slovak construction industry has not yet been carried out. The article discusses the issue of exploitation of cloud computing in construction project management in Slovakia. The main objective of the research is to confirm whether factors such as size of construction enterprise, owner of construction enterprise and participant of construction project have any impact on the exploitation level of cloud computing in construction project management. It includes confirmation of differences in use between different participants of the construction project or between construction enterprises broken down by size and shareholders.
Study on modular construction management in AP1000 nuclear plant project
International Nuclear Information System (INIS)
Fang Xiaopeng; Shen Wenrong; Sun Kebin; Wei Zhong
2010-01-01
The construction of AP1000 Nuclear Power Plant (NPP) has commenced in China. The AP1000 NPP features a passive design concept and modular construction technology. Based on the management of the construction of current AP1000 NNP, this paper describes the effects on Nuclear Island (NI) construction project management resulting from modular construction technology, as well as new construction techniques and methods. This paper puts forward new requirements for construction schedule management of the nuclear island construction at different levels. The AP1000 NI construction logic features the parallel construction of civil and structural erection as the main approach, with the integrated schedule of module fabrication, assembly and installation as support. The structural modules of AP1000 project are prefabricated in shop, delivered to site as sub-modules and assembled to integrated structural module. The assembled module is transported to the construction site, hoisted and finally set in NI. This paper illustrates how to ensure the construction quality of structural modules by analyzing the interface process and key links in the quality control program, and introduces how to ensure the safety of heavy structural components during various construction phases by evaluating and analyzing the construction safety process. This paper also makes an analysis of the safe environment for the assembly and installation of Containment Vessel, the management of product protection and personnel safety inside the Containment Building during 'Open Top' construction, raises to implement effective protection for the numerous pre-set mechanical modules and equipments, as well as personnel safety protection programs and measures. The modular construction feature of AP1000 NPP design requires technique improvement and management innovation during the NI construction. This paper makes a study and research on the control management of schedule, quality and safety of AP1000 NPP NI
A web-based Decision Support System for the optimal management of construction and demolition waste.
Banias, G; Achillas, Ch; Vlachokostas, Ch; Moussiopoulos, N; Papaioannou, I
2011-12-01
Wastes from construction activities constitute nowadays the largest by quantity fraction of solid wastes in urban areas. In addition, it is widely accepted that the particular waste stream contains hazardous materials, such as insulating materials, plastic frames of doors, windows, etc. Their uncontrolled disposal result to long-term pollution costs, resource overuse and wasted energy. Within the framework of the DEWAM project, a web-based Decision Support System (DSS) application - namely DeconRCM - has been developed, aiming towards the identification of the optimal construction and demolition waste (CDW) management strategy that minimises end-of-life costs and maximises the recovery of salvaged building materials. This paper addresses both technical and functional structure of the developed web-based application. The web-based DSS provides an accurate estimation of the generated CDW quantities of twenty-one different waste streams (e.g. concrete, bricks, glass, etc.) for four different types of buildings (residential, office, commercial and industrial). With the use of mathematical programming, the DeconRCM provides also the user with the optimal end-of-life management alternative, taking into consideration both economic and environmental criteria. The DSS's capabilities are illustrated through a real world case study of a typical five floor apartment building in Thessaloniki, Greece. Copyright © 2011 Elsevier Ltd. All rights reserved.
2010-04-01
... construction management services? 900.118 Section 900.118 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE...” regulations apply to construction management services? No. Construction management services may be contracted separately under section 108 of the Act. Construction management services consultants and/or Indian tribe or...
Directory of Open Access Journals (Sweden)
BRONEVYTSKYI S. P.
2015-10-01
Full Text Available Purpose. Development of offers on stimulation of construction of affordable housing by reformation of a construction complex management system. Methodology. The revelation of the problems of planning of construction in large cities. The analysis of forming of structure of a build complex management in soviet times and in a transitional period. The revelation of the modern, actual, socio-economic problems of the construction activity management. Proposition on the improvement of methods of construction management in cities of Ukraine. Results. The methods of a construction complex management in countries with a market economy as for building of affordable housing are shown. Originality. In composition of a town-planning documentations, except for the norms of the common use of territories of city (density of population of micro region, the maximum parameters of a construction examining of land areas are proposed to determine: building percent and coefficient of maximum superficial area. Practical value. The principle of management and organization of construction is norms of a build use of territories for building of mass affordable housing for funds of population and investors while providing of the comfort of housing in accordance with state construction norms.
Risk assessment and model for community-based construction ...
African Journals Online (AJOL)
It, therefore, becomes necessary to systematically manage uncertainty in community-based construction in order to increase the likelihood of meeting project objectives using necessary risk management strategies. Risk management, which is an iterative process due to the dynamic nature of many risks, follows three main ...
Construction work management for nuclear power stations
International Nuclear Information System (INIS)
Yoshikawa, Yuichiro
1982-01-01
Nuclear power generation is positioned as the nucleus of petroleum substitution. In the Kansai Electric Power Co., efforts have been made constantly to operate its nuclear power plants in high stability and safety. At present, Kansai Electric Power Co. is constructing Units 3 and 4 in the Takahama Nuclear Power Station in Fukui Prefecture. Under the application of the management of construction works described here, both the nuclear power plants will start operation in 1985. The activities of Kansai Electric Power Co. in the area of this management are described: an outline of the construction works for nuclear power stations, the management of the construction works in nuclear power stations (the stages of design, manufacturing, installation and test operation, respectively), quality assurance activities for the construction works of nuclear power plants, important points in the construction work management (including the aspects of quality control). (J.P.N.)
DEFF Research Database (Denmark)
Kuhrmann, Marco; Ternité, Thomas; Friedrich, Jan
2017-01-01
Process flexibility and adaptability is frequently discussed, and several proposals aim to improve software processes for a given organization-/project context. A software process line (SPrL) is an instrument to systematically construct and manage variable software processes, by combining pre-def......: A metamodel-based approach to effectively construct and manage families of software process models [Ku16]. This paper was published as original research article in the Journal of Systems and Software.......Process flexibility and adaptability is frequently discussed, and several proposals aim to improve software processes for a given organization-/project context. A software process line (SPrL) is an instrument to systematically construct and manage variable software processes, by combining pre...... to construct flexible SPrLs and show its practical application in the German V-Modell XT. We contribute a proven approach that is presented as metamodel fragment for reuse and implementation in further process modeling approaches. This summary refers to the paper Flexible software process lines in practice...
Development of Earned Value Management System in PP Construction Project
Energy Technology Data Exchange (ETDEWEB)
Lee, Sang-Hyun; Moon, Byeong-Suk [KHNP-CRI, Daejeon (Korea, Republic of)
2014-10-15
The NPP construction project has been determined in the form of a rather lump-sum contract with little details in resource requirements and estimations. Therefore, Earned Value Management System (EVMS) needs to be applied to the NPP projects in order to incorporate scope, schedule and cost targeting efficient and to control effective resource. The NPP projects in Korea have not applied EVMS. EVMS has phased in NPP construction project by Korea Hydro and Nuclear Power Co., Ltd (KHNP), playing the role of project master manager in NPP construction in Korea. This study presented the EVMS unlike other system. Accordingly, EVMS is expected to reduce risks and increase efficiency in the NPP project. The NPP construction project is a technology ntensive multi-construction project that should be based on economics and stability and that takes over ten years to complete, requiring investment of billions of dollars, a great number of persons concerned, and a vast store of human and material resources. KHNP is phasing EVMS in NPP construction project for overseas contracts and the efficient management, the paper presented the pilot EVMS in KHNP. It expected to control and identify of NPP construction projects by using EVMS as a computerized management tool which is quantitative and objective management criteria. It is necessary to improve of the contract system related EVM for enterprise system, and the effort will be required, such as on-site support and training so that this can be done in collaboration with the relevant stakeholders.
A Construction Management Framework for Mass Customisation in Traditional Construction
Directory of Open Access Journals (Sweden)
María Dolores Andújar-Montoya
2015-04-01
Full Text Available A Mass Customisation model is discussed as a competitive positioning strategy in the marketplace adding value to the customer’s end-use. It includes the user as part of the construction process responding to the customer’s demands and wishes. To the present day, almost all proposals for Mass Customisation have been focused on the design phase and single family houses. The reality is that the processes carried out in the work execution are so inefficient that the costs of the Mass Customisation models are assumed by the customer and they do not offer solutions that support the change management. Furthermore, this inefficiency often makes Mass Customisation unfeasible in terms of deadlines and site management. Therefore, the present proposal focuses on achieving the paradigm of Mass Customisation in the traditional residential construction complementary to the existing proposals in the design phase. All this through the proposal of a framework for the integral management in the work execution, which will address change management introduced by the users offering an efficient and productive model that reduces costs in the process. This model will focus on the synergy between different strategies, techniques and technologies currently used in the construction management (such as Lean Construction or Six Sigma, together with, other strategies and technologies that have proven to be valid solutions in other fields (such as Business Process Management, Service Oriented Architecture, etc..
A. A. Gulghane; Prof P. V. Khandve
2015-01-01
In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...
Intelligent Materials Tracking System for Construction Projects Management
Directory of Open Access Journals (Sweden)
Narimah Kasim
2015-05-01
Full Text Available An essential factor adversely affecting the performance of construction projects is the improper handling of materials during site activities. In addition, paper-based reports are mostly used to record and exchange information related to the material components within the supply chain, which is problematic and inefficient. Generally, technologies (such as wireless systems and RFID are not being adequately used to overcome human errors and are not well integrated with project management systems to make tracking and management of materials easier and faster. Findings from a literature review and surveys showed that there is a lack of positive examples of such tools having been used effectively. Therefore, this research focused on the development of a materials tracking system that integrates RFID-based materials management with resources modelling to improve on-site materials tracking. Rapid prototyping was used to develop the system and testing of the system was carried out to examine the functionality and working appropriately. The proposed system is intended to promote the employment of RFID for automatic materials tracking with integration of resource modelling (Microsoft (R Office Project in the project management system in order to establish which of the tagged components are required resources for certain project tasks. In conclusion, the system provides an automatic and easy tracking method for managing materials during materials delivery and inventory management processes in construction projects.
Exploitation and Benefits of BIM in Construction Project Management
Mesároš, Peter; Mandičák, Tomáš
2017-10-01
BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.
Lean construction management the Toyota way
Gao, Shang
2014-01-01
The book presents a mixed research method adopted to assess and present the Toyota Way practices within construction firms in general and for firms in China specifically. The results of an extensive structured questionnaire survey based on the Toyota Way-styled attributes identified were developed, and data collected from building professionals working in construction firms is presented. The quantitative data presented in the book explains the status quo of the Toyota Way-styled practices implemented in the construction industry, as well as the extent to which these attributes were perceived for lean construction management. The book highlights all the actionable attributes derived from the Toyota Way model appreciated by the building professionals, but alerts the readers that some attributes felled short of implementation. Further findings from in-depth interviews and case studies are also presented in the book to provide to readers an understanding how these Toyota Way practices can be implemented in real-l...
an appraisal of construction management practice in nigeria
African Journals Online (AJOL)
user
Keywords: Construction Project, Management tools, Project delivery, Construction Industry, Nigeria. 1. ..... developing country” International Journal of Project. Management, Vol. 18, Number 3 ... Construction Industry Perspective”, Building &.
Construct Measurement in Management Research
DEFF Research Database (Denmark)
Nielsen, Bo Bernhard
2014-01-01
Far too often do management scholars resort to crude and often inappropriate measures of fundamental constructs in their research; an approach which calls in question the interpretation and validity of their findings. Scholars often legitimize poor choices in measurement with a lack of availability......, this research note raises important questions about the use of proxies in management research and argues for greater care in operationalizing constructs with particular attention to matching levels of theory and measurement....
The research on the material management system in nuclear power plant construction process
International Nuclear Information System (INIS)
Liu Xuegeng; Huang Zhongping
2010-01-01
According to the module construction speciality of nuclear power plant, this article analyzes the relationship between the actual amount of the material transported to the construction site and the planed needs of the material, and points out the zero inventory management target in the nuclear power plant construction site. Based on this, the article put forward a nuclear power plant material management system which is based on the 'pull' information driver. This system is composed by material coding sub-system, procurement and site material integrated management sub-system and project control sub-system, and is driven by the material demand from construction site to realize the JIT purchasing. This structure of the system can reduce the gap between the actual amount of the material transported to the site and the planed needs of the material and achieve the target of reducing storage at construction site. (authors)
Managing Client Values in Construction Design
DEFF Research Database (Denmark)
Thyssen, Mikael Hygum; Emmitt, Stephen; Bonke, Sten
2008-01-01
In construction projects the client will comprise both owner, end-users, and the wider society, representatives of which may have conflicting goals and values; and these may not be fully realized by the stakeholders themselves. Therefore it is a great challenge to capture and manage the values...... for capturing and managing client values within a lean framework. This paper describes the initial findings of a joint research project between academia and industry practitioners that seeks to develop the workshop method to create a state of the art approach in construction design management. This includes...... of the multiple stakeholders that constitutes the “client”. However, seeing client satisfaction as the end-goal of construction it is imperative to make client values explicit in the early project phase and make sure that these values are reflected in all subsequent phases of design and construction...
Directory of Open Access Journals (Sweden)
Nikša Jajac
2013-02-01
Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.
Integrated construction management technology for power plants
International Nuclear Information System (INIS)
Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko
2003-01-01
The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)
Peer Assessment for Construction Management and Quantity Surveying Students
Directory of Open Access Journals (Sweden)
Patricia McLaughlin
2012-11-01
Full Text Available Students undertaking the Bachelor of ConstructionManagement degree course at RMIT University, Melbourne,qualify for registration with the Australian Institute ofQuantity Surveyors (AIQS and the Australian Institute ofBuilding (AIB upon graduation. Over the past decade thedegree course has been constantly upgraded and altered inline with recommendations from professional bodies such asthese and other industry partners. In 1994 the Departmentof Building and Construction Economics re-assesseda range of subjects including the first year technologysubjects. Out of the review a problem-based integratedlearning unit was developed and tested. This unit has nowbeen in place for ten years.Quantity surveying and construction management likemost other professions in the construction industryrequire teamwork and advanced consultation skills. Theseskills may be learnt through experience but there isconsiderable evidence that these skills can be taught in theundergraduate years. Therefore in line with team-basedapproaches used in industry and professional constructionsettings, this year a new assessment model - peerassessment - will be applied to the problem-based learningunit. This paper describes the procedures and processesused to introduce the change and examines the theoreticalbase upon which the model was developed.
Kim, Myoung Soo
2012-08-01
The purpose of this cross-sectional study was to examine current status of IT-based medication error prevention system construction and the relationships among system construction, medication error management climate and perception for system use. The participants were 124 patient safety chief managers working for 124 hospitals with over 300 beds in Korea. The characteristics of the participants, construction status and perception of systems (electric pharmacopoeia, electric drug dosage calculation system, computer-based patient safety reporting and bar-code system) and medication error management climate were measured in this study. The data were collected between June and August 2011. Descriptive statistics, partial Pearson correlation and MANCOVA were used for data analysis. Electric pharmacopoeia were constructed in 67.7% of participating hospitals, computer-based patient safety reporting systems were constructed in 50.8%, electric drug dosage calculation systems were in use in 32.3%. Bar-code systems showed up the lowest construction rate at 16.1% of Korean hospitals. Higher rates of construction of IT-based medication error prevention systems resulted in greater safety and a more positive error management climate prevailed. The supportive strategies for improving perception for use of IT-based systems would add to system construction, and positive error management climate would be more easily promoted.
Construction Management for Conventional Facilities of Proton Accelerator
International Nuclear Information System (INIS)
Kim, Jun Yeon; Cho, Jin Sam; Lee, Jae Sang
2008-05-01
Proton Engineering Frontier Project, puts its aim to building 100MeV 20mA linear proton accelerator which is national facility for NT, BT, IT, and future technologies, expected to boost up the national industry competitiveness. This R and D, Construction Management is in charge of the supportive works as site selection, architecture and engineering of conventional facilities, and overall construction management. The major goals of this work are as follows: At first, architecture and engineering of conventional facilities. Second, construction management, audit and inspection on construction of conventional facilities. Lastly, cooperation with the project host organization for adjusting technical issues of overall construction. In this research, We reviewed the basic design and made a detail design of conventional facilities. Preparation for construction license, site improvement and access road construction is fulfilled. Also, we made the technical support for project host as follows : selection of project host organization and host site selection, construction technical work for project host organization and procedure management
Gillen, Marion; Kools, Susan; McCall, Cade; Sum, Juliann; Moulden, Kelli
2004-01-01
Despite the institution of explicit safety practices in construction, there continue to be exceedingly high rates of morbidity and mortality from work-related injury. This study's purpose was to identify, compare and contrast views of construction managers from large and small firms regarding construction safety practices. A complementary analysis was conducted with construction workers. A semi-structured interview guide was used to elicit information from construction managers (n = 22) in a series of focus groups. Questions were designed to obtain information on direct safety practices and indirect practices such as communication style, attitude, expectations, and unspoken messages. Data were analyzed using thematic content analysis. Managers identified a broad commitment to safety, worker training, a changing workplace culture, and uniform enforcement as key constructs in maintaining safe worksites. Findings indicate that successful managers need to be involved, principled, flexible, and innovative. Best practices, as well as unsuccessful injury prevention programs, were discussed in detail. Obstacles to consistent safety practice include poor training, production schedules and financial constraints. Construction managers play a pivotal role in the definition and implementation of safety practices in the workplace. In order to succeed in this role, they require a wide variety of management skills, upper management support, and tools that will help them instill and maintain a positive safety culture. Developing and expanding management skills of construction managers may assist them in dealing with the complexity of the construction work environment, as well as providing them with the tools necessary to decrease work-related injuries.
Construction of BIM-based SMART-ITL Facility Management System
International Nuclear Information System (INIS)
Jeon, Woo-Jin; Yi, Sung-Jae; Park, Hyun-Sik; Ryu, Sung-Uk; Bae, Hwang; Hwang, Sang-Chul; Min, Byung-Eui
2015-01-01
The flow area and volume are scaled down to 1/49. The ratio of the hydraulic diameter is 1/7. Therefore, SMART-ITL is a large-scale thermalhydraulic test facility with about 45 m height, which is consisted of 10 m underground and 35 m from the ground level. Until now, the management of design data and maintenance of large scale test facilities have been managed based on hard-copy information. Recently, Thermal Hydraulics Safety Research Division (THSRD) at Korea Atomic Energy Research Institute (KAERI) has developed Facility Management System (FMS) based Building Information Modeling (BIM) to manage its design data more effectively for these large scale test facilities of SMART-ITL and ATLAS, and this BIM technology has been applied to SMART-ITL at the first. This study proposed a method of effective management and maintenance of design data applied to the SMART-ITL. That is, a FMS was developed based on the BIM technology for SMART-ITL. Figure 2 shows an overview of FMS development process based on BIM technology. SMART-ITL FMS facilitates its management and maintenance more effectively and accurately by 3- dimensional visualization. It enables the shape information of large scale test facilities to be visualized intuitively in a virtual space, and the efficient maintenance of data and instruments is possible by linking 3D shape information
Construction of BIM-based SMART-ITL Facility Management System
Energy Technology Data Exchange (ETDEWEB)
Jeon, Woo-Jin; Yi, Sung-Jae; Park, Hyun-Sik; Ryu, Sung-Uk; Bae, Hwang [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of); Hwang, Sang-Chul; Min, Byung-Eui [DDRsoft Co., Daejeon (Korea, Republic of)
2015-10-15
The flow area and volume are scaled down to 1/49. The ratio of the hydraulic diameter is 1/7. Therefore, SMART-ITL is a large-scale thermalhydraulic test facility with about 45 m height, which is consisted of 10 m underground and 35 m from the ground level. Until now, the management of design data and maintenance of large scale test facilities have been managed based on hard-copy information. Recently, Thermal Hydraulics Safety Research Division (THSRD) at Korea Atomic Energy Research Institute (KAERI) has developed Facility Management System (FMS) based Building Information Modeling (BIM) to manage its design data more effectively for these large scale test facilities of SMART-ITL and ATLAS, and this BIM technology has been applied to SMART-ITL at the first. This study proposed a method of effective management and maintenance of design data applied to the SMART-ITL. That is, a FMS was developed based on the BIM technology for SMART-ITL. Figure 2 shows an overview of FMS development process based on BIM technology. SMART-ITL FMS facilitates its management and maintenance more effectively and accurately by 3- dimensional visualization. It enables the shape information of large scale test facilities to be visualized intuitively in a virtual space, and the efficient maintenance of data and instruments is possible by linking 3D shape information.
Supply Chain Management In Construction Revealed
Dr. Ghaith Al-Werikat
2017-01-01
The construction supply chain plays a major role in the construction market competition. Construction supply chain management assists enterprises by helping to improve competitiveness increase profits and have more control over the different factors and variables within the project. This paper discusses the construction supply chain characteristics challenges and problems supply chains encounter and the benefits of an integrated supply chain in the construction sector.
Haiyang nuclear power construction management and practice
International Nuclear Information System (INIS)
Wang Fengxue
2010-01-01
The paper introduces the basic situation of Shandong Haiyang Nuclear Power Plant, as well as the management and progress of the project. Through the construction management practice, problems encountered in nuclear power construction are put forward for peer exchange and discussion. (author)
Supply Chain Management In Construction Revealed
Directory of Open Access Journals (Sweden)
Dr. Ghaith Al-Werikat
2017-03-01
Full Text Available The construction supply chain plays a major role in the construction market competition. Construction supply chain management assists enterprises by helping to improve competitiveness increase profits and have more control over the different factors and variables within the project. This paper discusses the construction supply chain characteristics challenges and problems supply chains encounter and the benefits of an integrated supply chain in the construction sector.
Directory of Open Access Journals (Sweden)
Murat Gunduz
2017-11-01
Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.
Elementary Introduction to the Green Management of the Construction in Whole Process
Na), Wu Y. N.(Yun; Yu), Yan H. Y.(Hong; Jun), Huang Z. J.(Zhi
Construction industries consume more energy resources than necessary. it is essential to establish a management system with all pollution problems resolved to construct green buildings. By applying the theory of whole life cycle, this paper divides the whole process of construction into four sub-phases, which will also be subdivided into more concrete working procedures. Based on this, a systematic framework is promoted for the green management of the construction, especially and creatively, considering the green aims as important as the traditional three aims-"quality aim, schedule aim and cost aim". This framework, adhering to the integration idea-"customers first, whole optimal", regards the green control and workflow as an organic whole in order to build green, sustainable and healthy architecture, and then provide a perfect guide and reference to the green management.
Construction Management for Conventional Facilities of Proton Accelerator
International Nuclear Information System (INIS)
Kim, Jun Yeon; Cho, Jang Hyung; Cho, Sung Won
2013-01-01
Proton Engineering Frontier Project, puts its aim to building 100MeV 20mA linear proton accelerator which is national facility for NT, BT, IT, and future technologies, expected to boost up the national industry competitiveness. This R and D, Construction Management is in charge of the supportive works such as site selection, architecture and engineering of conventional facilities, and overall construction management. The major goals of this work are as follows: At first, architecture and engineering of conventional facilities. Second, construction management, supervision and inspection on construction of conventional facilities. Lastly, cooperation with the project host organization, Gyeongju city, for adjusting technically interrelated work during construction. In this research, We completed the basic, detail, and field changed design of conventional facilities. Acquisition of necessary construction and atomic license, radiation safety analysis, site improvement, access road construction were successfully done as well. Also, we participated in the project host related work as follows: Project host organization and site selection, construction technical work for project host organization and procedure management, etc. Consequently, we so fulfilled all of the own goals which were set up in the beginning of this construction project that we could made contribution for installing and running PEFP's developed 100MeV 20mA linear accelerator
Constructing collaboration and management platform with spring+ hibernate
International Nuclear Information System (INIS)
Zhang Hongmei; Ou Ge; Nie Jianyin; Song Liming; Chen Gang
2007-01-01
HCMP is the platform of collaboration and management for HXMT. The documents of HXMT project are the main context of HCMP. Besides the users of HXMT project, HCMP also serves other users. HCMP adopts the hierarchy Web structure to implement context release, documents approval, project management and portal website. HCMP provides the support of informatlization and standardization for HXMT project. This paper adopts Spring + Hibernate technique to construct the J2EE architecture, based on which HCMP is implemented. (authors)
AUTOCAD IN THE OPERATIONAL MANAGEMENT OF THE CONSTRUCTION SITE
Directory of Open Access Journals (Sweden)
Tsareva Marina Vladimirovna
2016-04-01
Full Text Available Operational management of the construction is usually based on information analysis systems, which are aimed at the monitoring of working schedule and volumes as consistent with predicated schedules. The result of such systems’ operation is traditional information graphics (diagrams, charts, etc., which provides idea on the current state of the construction site and deviations from the planned settings. The author considers the visualization technology of construction of objects using an image of the situation on the AutoCAD drawings, converted into an interactive format. The article focuses on imperfections of the existing technologies of information support of the managers. The creation of unified IT platform is offered on the basis of CAD for creating an integrated information storage and visualization of the environment using electronic drawings and diagrams. Using interactive methods it is possible to illustrate the condition of almost any part of the construction project using these drawings and diagrams. E-drawings contain the basic information resources - estimates, plans, sections, specifications, technology, construction, etc. necessary for the calculation of indicators. The author proved that implementation of visualization is most efficient in case of electronic drawings in 3D format.
Construction techniques and management methods for BWR plants
International Nuclear Information System (INIS)
Shimizu, Yohji; Tateishi, Mizuo; Hayashi, Yoshishige
1989-01-01
Toshiba is constantly striving for safer and more efficient plant construction to realize high-quality BWR plants within a short construction period. To achieve these aims, Toshiba has developed and improved a large number of construction techniques and construction management methods. In the area of installation, various techniques have been applied such as the modularization of piping and equipment, shop installation of reactor internals, etc. Further, installation management has been upgraded by the use of pre-installation review programs, the development of installation control systems, etc. For commissioning, improvements in commissioning management have been achieved through the use of computer systems, and testing methods have also been upgraded by the development of computer systems for the recording and analysis of test data and the automatic adjustment of controllers in the main control system of the BWR. This paper outlines these construction techniques and management methods. (author)
Managing Pre-Construction and Construction Risks on Project Sites in Abuja-Nigeria
Directory of Open Access Journals (Sweden)
Jimoh R.A.
2016-03-01
Full Text Available Managing risks in construction projects has been acknowledged as a key direction process for the purposes of attaining the project goal in terms of time, cost, quality, safety, and environmental sustainability. Hence, the paper evaluated pre-construction and construction risks on active project sites in Abuja-Nigeria. This was achieved using survey method through the self-administration of 35 questionnaires to the professionals handling the 35 identified projects being undertaking at that time. Results showed that errors and omissions in design and improperly defined project scope had mean score values of 3.03 and 2.54, respectively, were the construction risks most experienced by the professionals during pre-construction. On the other hand, fluctuation in market prices and delays with mean score values of 3.14 and 2.74, respectively, were the construction risks experienced by the professionals during the construction phase of the projects. It is recommended that procurement methods such as construction management should be adopted and stakeholders should keep to their own side of the bargain to avoid unnecessary delays.
Construction project management handbook : September 2009.
2009-09-01
The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...
Directory of Open Access Journals (Sweden)
Tsenguun Ganbat
2018-01-01
Full Text Available International construction is complicated and involves high risks. However, with the development of technological innovation, Building Information Modeling (BIM emerged and seems to be able to address certain risks. To understand BIM applications in risk management for international construction, a state-of-the-art review is required. Therefore, this paper aims to identify the research trends and opportunities for risk management in BIM-enabled international construction by reviewing 526 peer-reviewed journal articles for the years 2007–2017. Thus five steps of bibliometric analysis were conducted based on the proposed frameworks of BIM risk management in international construction (BIM-RM-INTL. The results show that the popularization of BIM not only attracts all stakeholders’ interests but also brings some risks. For example, financial factors are hard to detect and control through BIM, information loss during transmission stands out, and BIM has no unified standards and regulations for international construction. The research has mapped existing research results and their relationships for future risk management in BIM-enabled international construction.
Using Construction Management for Public and Institutional Facilities.
Public Technology, Inc., Washington, DC.
Construction management has been developed as an alternative to the traditional public building process and seeks to save an owner time and cost primarily through better activity coordination and project management. This report was developed to guide public agencies in their evaluation of construction management for their particular needs. It…
An Environmental Management Maturity Model of Construction Programs Using the AHP-Entropy Approach
Directory of Open Access Journals (Sweden)
Libiao Bai
2018-06-01
Full Text Available The accelerating process of urbanization in China has led to considerable opportunities for the development of construction projects, however, environmental issues have become an important constraint on the implementation of these projects. To quantitatively describe the environmental management capabilities of such projects, this paper proposes a 2-dimensional Environmental Management Maturity Model of Construction Program (EMMMCP based on an analysis of existing projects, group management theory and a management maturity model. In this model, a synergetic process was included to compensate for the lack of consideration of synergies in previous studies, and it was involved in the construction of the first dimension, i.e., the environmental management index system. The second dimension, i.e., the maturity level of environment management, was then constructed by redefining the hierarchical characteristics of construction program (CP environmental management maturity. Additionally, a mathematical solution to this proposed model was derived via the Analytic Hierarchy Process (AHP-entropy approach. To verify the effectiveness and feasibility of this proposed model, a computational experiment was conducted, and the results show that this approach could not only measure the individual levels of different processes, but also achieve the most important objective of providing a reference for stakeholders when making decisions on the environmental management of construction program, which reflects this model is reasonable for evaluating the level of environmental management maturity in CP. To our knowledge, this paper is the first study to evaluate the environmental management maturity levels of CP, which would fill the gap between project program management and environmental management and provide a reference for relevant management personnel to enhance their environmental management capabilities.
Mapping site-based construction workers’ motivation: Expectancy theory approach
Directory of Open Access Journals (Sweden)
Parviz Ghoddousi
2014-03-01
Full Text Available The aim of this study is to apply a recently proposed model of motivation based on expectancy theory to site-based workers in the construction context and confirm the validity of this model for the construction industry. The study drew upon data from 194 site-based construction workers in Iran to test the proposed model of motivation. To this end, the structural equation modelling (SEM approach based on the confirmatory factor analysis (CFA technique was deployed. The study reveals that the proposed model of expectancy theory incorporating five indicators (i.e. intrinsic instrumentality, extrinsic instrumentality, intrinsic valence, extrinsic valence and expectancy is able to map the process of construction workers’ motivation. Nonetheless, the findings posit that intrinsic indicators could be more effective than extrinsic ones. This proffers the necessity of construction managers placing further focus on intrinsic motivators to motivate workers.
Mapping site-based construction workers’ motivation: Expectancy theory approach
Directory of Open Access Journals (Sweden)
Parviz Ghoddousi
2014-03-01
Full Text Available The aim of this study is to apply a recently proposed model of motivation based on expectancy theory to site-based workers in the construction context and confirm the validity of this model for the construction industry. The study drew upon data from 194 site-based construction workers in Iran to test the proposed model of motivation. To this end, the structural equation modelling (SEM approach based on the confirmatory factor analysis (CFA technique was deployed. The study reveals that the proposed model of expectancy theory incorporating five indicators (i.e. intrinsic instrumentality, extrinsic instrumentality, intrinsic valence, extrinsic valence and expectancy is able to map the process of construction workers’ motivation. Nonetheless, the findings posit that intrinsic indicators could be more effective than extrinsic ones. This proffers the necessity of construction managers placing further focus on intrinsic motivators to motivate workers.
Directory of Open Access Journals (Sweden)
Sinenko Sergey
2017-01-01
Full Text Available Economic efficiency of using funds in construction of buildings and structures begins from an effective, proper design, which is based on modern, cutting-edge, advanced equipment, streamlined organization and process solutions of construction operations. In the light of this it is considered application of “Self-Organization and Technology of Building” multifunctional software package capable of solving various engineering tasks on designing management of construction operations in accordance with the applicable rules and regulations in view of using software for automatic generation of workflow. Implementing this software in the construction management processes may help to solve management tasks at the construction site.
Risk management in public sector construction projects: Case ...
African Journals Online (AJOL)
a project environment. Since projects are complicated, experience ... work, delays trigger cost overruns in construction projects (African. Development Bank ..... quantity surveying, contract management, and engineering. Table 4: Research ..... professionals at the business and operational levels of construction management.
Qin, Minwu
2018-05-01
With the progress of science and technology, people use more and more types of electrical equipment and the functions are more and more complicated, which put forward higher requirements on the construction quality of electrical construction. If you ignore some of the necessary quality requirements and violate the specification of operation in the process of building electrical construction, that will bring great security risks and resulting in huge economic losses, even endanger personal safety. Manage and control construction quality of building electrical construction must be carried out throughout the whole process of construction. According to the construction characteristics of building electrical construction, this article analyze the construction details that are easy to be ignored but very important in the construction, based on management theory and put forward the methods of quality management in the whole process of building electrical construction. This template explains and demonstrates how to prepare your camera-ready paper for Trans Tech Publications. The best is to read these instructions and follow the outline of this text.
Methodical ecologization principles in construction management
Nuzhina Irina Pavlovna; Yudakhina Olga Borisovna
2015-01-01
In the article the subject of ecologization of construction sector is presented, the necessity of ecologization technology and technological processes is proved. The article also presents principles of ecologically friendly management of construction and investment activities and describes these principles in detail.
Determining the essential skill requirements for construction managers' practice in Nigeria
Directory of Open Access Journals (Sweden)
Olabode E Ogunsanmi
2016-12-01
Full Text Available The study investigates the essential skill requirements for construction managers in Nigeria. The objective is to determine the most important skill requirements for construction managers. A structured questionnaire was administered to construction professionals who worked recently with construction managers in their recently completed projects. Snowballing sampling technique was used to select seventy (70 respondents, however only forty (40 responses were used for the data analysis. The results indicate that essential skills required by the construction managers for their jobs include: procedural-industrial skills, quality assurance/management, listening skills, knowledge of codes and regulations, sustainable skills and ability to learn skills. These skills are important for the construction manager to practice effectively in Nigeria and other developing countries. These findings have seven practical implications to professional bodies, Universities and other trainers of construction managers, whose present curricula may be deficient in knowledge areas in industry (business, managerial, personal and technical. These institutions may need to re-orientate and improve the curricula for newly trained construction managers to cope with current skill requirements. On the other hand, recruiting agencies should ensure that job applicants with the right hard and soft skills are engaged as construction managers. Consequently efficient and effective management of future construction projects in Nigeria and other developing countries can be ensured.
GIS-based planning system for managing the flow of construction and demolition waste in Brazil.
Paz, Diogo Henrique Fernandes da; Lafayette, Kalinny Patrícia Vaz; Sobral, Maria do Carmo
2018-05-01
The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials.
48 CFR 915.404-4-71 - Profit and fee-system for construction and construction management contracts.
2010-10-01
... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Profit and fee-system for construction and construction management contracts. 915.404-4-71 Section 915.404-4-71 Federal Acquisition... Contract Pricing 915.404-4-71 Profit and fee-system for construction and construction management contracts. ...
MANAGEMENT OF CONSTRUCTION TIME AT THE RESTORATION OF THE OSTANKINO TV TOWER
Directory of Open Access Journals (Sweden)
Михаил Николаевич ЕРШОВ
2015-05-01
Full Text Available The article presents options for managing construction time at restoration and renovation of the "Ostankino television tower", Moscow, also provides variants of method for optimization construction and installation works. Methodology is based on the construction of the project models in Microsoft Project and their experimental and statistical analysis using software COMPEX. This method is effective in the optimization reconstruction of complex engineering structures.
Economic Analysis of USN-Based Data Acquisition Systems in Tall Building Construction
Directory of Open Access Journals (Sweden)
Hyunsu Lim
2017-08-01
Full Text Available The successful construction of tall buildings requires effective construction management based on various quantitative data. The recent development of ubiquitous sensor networks (USNs enables massive amounts of data to be collected in real-time. However, the application of USN-based data acquisition systems to repetitive tasks on typical floors of tall buildings can be inefficient, because this may involve the repetitive reinstallation of sensors and the repositioning of data loggers and routers to enable continuous data transfer. To minimize this cumbersome work, a modified data acquisition method using reusable sensor nodes and mobile devices can be a useful solution. This study analyzes the economic aspects of the USN-based systems for concrete temperature monitoring by using the activity-based costing technique. The case study shows that the modified system can reduce the process cost by about 19%. It can also reduce the resource input time of management by about 55%, freeing up time for other management activities. Moreover, the cost benefits should scale up as projects increasingly require more measurement and monitoring. This study should facilitate the application of USN-based information management systems, particularly for tall building construction.
Construction Management: Building Schools Faster in the International Marketplace
Scarano, Joseph J.
1976-01-01
Construction management accelerates school construction, increases quality and labor productivity, lowers costs, and offers developing nations an opportunity to improve their own management capabilities. (MLF)
Stainless steel pool constructing technology and management of Fangjiashan Nuclear Power Company
International Nuclear Information System (INIS)
Wei Lianfeng; Wang Qun
2013-01-01
The construction of Fangjiashan nuclear power plant stainless steel cladding has been taken much attention. Based on the careful analysis of stainless steel cladding welding and construction main issues; Many measures have been taken such as welding technology, construction process, the stress control of welding deformation, the cleanliness control of construction process, install precision control, improvements of Non-destructive testing, product protection, etc. And installation methods and techniques have been improved and innovative, the installation quality of stainless steel cladding has been enhanced. At the same time, as owners of the plants, we explored the methods of quality supervision and control, together with the relevant units; and sense of quality management has been unified effectively, made stainless steel cladding quality getting better and better. Fangjiashan nuclear power stainless steel cladding construction quality and management experience has been highly recognized by every company. (authors)
Information systems for material flow management in construction processes
Mesároš, P.; Mandičák, T.
2015-01-01
The article describes the options for the management of material flows in the construction process. Management and resource planning is one of the key factors influencing the effectiveness of construction project. It is very difficult to set these flows correctly. The current period offers several options and tools to do this. Information systems and their modules can be used just for the management of materials in the construction process.
Best Practice of Construction Waste Management and Minimization
Directory of Open Access Journals (Sweden)
Khor Jie Cheng
2014-07-01
Full Text Available Material management is an important issue as seen in construction waste management. Best practice of material management is accompanied by various benefits which are acknowledged by several studies. The site layout has particular effects on both materials and their waste through effective waste management practice. Ignoring the benefits of material management could result in a daily reduction in productivity of up to 40% by material wastage. Thus, the benefits of effective material management must be well comprehended for the sake of waste minimization. Another convincing fact about waste is that poor site management accounts for the largest factor of waste generation. Hence the site condition is very crucial in developing effective material management. Factors contributing to the efficiency of material management process are effective logistical management and supply chain management. The logistics system must be performing as schedule so that materials are wisely managed on-site without encountering presence of excessive materials. As materials management is closely related to logistics in construction projects, there will be delay in construction projects when materials are not delivered to site as scheduled. The management must be effective in terms of delivery, off-loading, storage, handling, on-site transportation and on-site utilization of materials.
Directory of Open Access Journals (Sweden)
Caio Dalla Zanna
2017-05-01
Full Text Available In the current construction market there is a high demand for sustainability. In addition to that the Brazilian government is enacting tougher and tougher legislation on the disposal of solid construction waste. These demands increasingly make the construction company responsible for the entire lifecycle of its waste as well as the accompanying cost and environmental impact of solid waste. A software program was used in the research which allows construction companies gather information about waste. This helps the decision makers, at all different levels of the company improving waste management through better decisions. The software program was used during the construction of two residential buildings, constructed by a large construction company in the South of Brazil. Five key performance indicators were used by the construction company team: Generated Waste Height (cm, cost per built area (R$ m-², Waste Segregation Quality Index (WSQI, Effective Waste Management Index (EWMI and Waste Management Quality Index (WMQI. After four months the total cost of waste management was R$ 83,551.71 for site A and R$ 91,668.02 for site B. About 70% of the waste was raw material waste. The software program provided information not previously available, which made it possible to calculate the cost of material loss, indicating corrective actions, all without losing sight of cost reduction opportunities for the management of Solid construction Waste (SCW.
Love, Peter E D; Smith, Jim; Teo, Pauline
2018-05-01
Error management theory is drawn upon to examine how a project-based organization, which took the form of a program alliance, was able to change its established error prevention mindset to one that enacted a learning mindfulness that provided an avenue to curtail its action errors. The program alliance was required to unlearn its existing routines and beliefs to accommodate the practices required to embrace error management. As a result of establishing an error management culture the program alliance was able to create a collective mindfulness that nurtured learning and supported innovation. The findings provide a much-needed context to demonstrate the relevance of error management theory to effectively address rework and safety problems in construction projects. The robust theoretical underpinning that is grounded in practice and presented in this paper provides a mechanism to engender learning from errors, which can be utilized by construction organizations to improve the productivity and performance of their projects. Copyright © 2018 Elsevier Ltd. All rights reserved.
Management as a Symbolizing Construction? Re-Arranging the Understanding of Management
Directory of Open Access Journals (Sweden)
Katharina Mayr
2010-09-01
Full Text Available In this article, we outline the concept of management as a symbolizing construction. According to Niklas LUHMANN, organizations process by referring to decisions. But decisions are not simply "given" and in principle invisible. This is the reason why organizations institute formalities like protocols, signatures or other insignia of the official that symbolize the decision—without actually being a decision. These symbols allow for making decisions "process-able." And just like a protocol or a signature, management symbolizes decisions as well. Management provides an organizational practice with symbols of decision making without being the "unity" of the decisions, as decisions perpetually have to be reconstructed, redefined and rearranged in the communication of all organizational units. Therefore management symbolizes on the one hand more than it can achieve. On the other hand the importance of management as a symbolizing construction lies in allowing the reconstruction, redefining and rearrangement of decisions by making them visible and recognizable. Heroic managers, meetings, management tools and procedures are solutions to the paradox of decision making. By symbolizing decidedness they create credibilities that conceal the self-referential construction of organizational communication and the paradox of its decision praxis. URN: urn:nbn:de:0114-fqs1003218
The management of design interfaces in the nuclear power construction
International Nuclear Information System (INIS)
Lv Shubao
2005-01-01
This paper introduces the design interfaces management in the construction of nuclear power plant through the Interface Control Manual (ICM). The ICM management model had been applied and practiced in the construction of both DAYA BAY and LING AO phase I (LNPS I ) nuclear power stations. It has solved many troublesome matters in the design interfaces information exchange among all concerned parties, and contributed to these projects greatly. The author considers that the ICM management: has great value for extending and applying in the new construction of nuclear power station. In order to understand easily the ICM management model, the paper expatiates on the compiling principle, the procedure establishing, the interface editing and the ICM updating. The advantages of using ICM are as follow: First, the ICM model provides the authoritative and legal document to be obeyed by all contractors for exchanging the design technical information basing on the responsibility and planning. Second, the ICM enhances the schedule control for the project engineering. Third, using ICM to manage the design information exchange solves the questions assorted with different parties, and decreases the times spent in unproductive coordination meeting. Fourth, the ICM management uses computer database and provides convenient method for engineers to track and control interface exchange, gets twice the result with half the effort. Fifth, the ICM database allows easy retrieval of any technical information for further re-use in a similar project. (authors)
Management of construction and demolition wastes as secondary building resources
Manukhina, Lyubov; Ivanova, Irina
2017-10-01
The article analyzes the methods of management of construction and demolition wastes. The authors developed suggestions for improving the management system of the turnover of construction and demolition wastes. Today the issue of improving the management of construction and demolition wastes is of the same importance as problems of protecting the life-support field from pollution and of preserving biological and land resources. The authors educed the prospective directions and methods for improving the management of the turnover processes for construction and demolition wastes, including the evaluation of potential of wastes as secondary raw materials and the formation of a centralized waste management system.
Quality Management System at Construction Project: A Questionnaire Survey
P.P.Mane; J.R.Patil
2015-01-01
The best quality, time and cost are the important aspects of successful construction project which fulfills the main goal of construction industry. The quality management has to provide the environment within which related tools, techniques and procedures can be deployed effectively leading to operational success for a construction project. The role of quality management for a construction company is not an isolated activity, but intertwined with all the operational and managerial...
Sustainable Management of Construction and Demolition Materials
This web page discusses how to sustainably manage construction and demolition materials, Information covers, what they are, and how builders, construction crews, demolition teams,and deign practitioners can divert C&D from landfills.
ROW (Right-of-Way) interfering construction activities management program
Energy Technology Data Exchange (ETDEWEB)
Rosito, Roberta; Oliveira, Marisa; Lima, Shirley [TRANSPETRO - PETROBRAS Transporte S.A., Rio de Janeiro, RJ (Brazil)
2009-07-01
A significant portion of pipeline failures occurs due to external damage. This includes third party right of way (ROW) encroachment, which shall be identified and avoided. However, injuries caused by known and planned activities do happen. Construction of crossing or sharing ROW pipelines, crossing roads and bridges, neighboring buildings and excavations of any kind might put existing pipelines in risk. This paper presents how the TRANSPETRO ROW Interfering Construction Activities Management Program is implemented by a regional ROW maintenance department responsible for more than 3,000 km of pipelines, mostly in Rio de Janeiro and Minas Gerais states. This program is based on a TRANSPETRO procedure that was written after the publication of the Official Order number 125 of ANP (Oil, Gas and Biofuel Brazilian National Agency). Tasks from design review and approval to field construction supervision are performed by the staff responsible for the routine patrols and maintenance management. The ability of foreseeing risky activities is improved by expertise gained from day-to-day work on site. (author)
Network design and operational modelling for construction green supply chain management
Directory of Open Access Journals (Sweden)
Pengfei Zhou Dong Chen
2013-01-01
Full Text Available Based on studying organizational structure of Construction Green Supply Chain Management (CGSCM, a mathematical programming model of CGSCM was proposed. The model aimed to maximize the aggregate profits of normalized construction logistics, the reverse logistics and the environmental performance. Numerical experiments show that the proposed approach can improve the aggregate profit effectively. In addition, return ratio, subsidies from governmental organizations, and environmental performance were analyzed for CGSCM performance. Herein, the proper return, subsidy and control strategy could optimize construction green supply chain.
MULTIPLE PROJECT MANAGEMENT IN THE CONSTRUCTION INDSUTRY
Directory of Open Access Journals (Sweden)
Luciana Hazin Alencar
2010-06-01
Full Text Available The field of project management has historically focused on the administration of one project at a time, a focus that is insufficient given the growing need for organizations to manage multiple projects simultaneously. The requirements of Multiple Project Management (MPM involves demands and practices that are different from those of single projects. MPM poses a special need for coordination of shared resources across multiple projects in a way that can maintain the firm’s strategic focus and facilitate effective decision making. The construction industry is noteworthy for its frequent need for the management of multiple projects. This paper offers a review of the last five years of indexed literature related to multiple project management in the construction industry, identifies gaps and suggests promising new avenues of inquiry.
Management of metrology in measuring of the displacement of building construction
Directory of Open Access Journals (Sweden)
Jiří Kratochvíl
2007-06-01
Full Text Available The metrology management of the measurement of the displacement of building construction is not regulated in the standard ČSN ISO 73 0405 - Measurement of the displacement of building construction. But the metrology management has to be included in the project of measurement of the displacement (Stage of project. Then we have to pay an attention to the metrological management during this measurement (Stage of realization and during the evaluation of this measurement (Stage of evaluation. We have to insist on the subsequent improving of metrology management within the frame of the next project (so-called feedback. The metrology management in the measurement of the displacement during the stages should be based on an application of statutory instruments and technical standards. We should insist especially on the system of standards for the quality control ISO 9000. Considering specialities of geodetic measurements it is necessary to adapt the metrology management. That is why it will differ from the metrology management in other fields of knowledge. This paper includes some steps of metrological provision which must not be ignored.
Horizon Dam design, construction, and quality management
Energy Technology Data Exchange (ETDEWEB)
Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)
2010-07-01
This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.
Constructing Proxy Variables to Measure Adult Learners' Time Management Strategies in LMS
Jo, Il-Hyun; Kim, Dongho; Yoon, Meehyun
2015-01-01
This study describes the process of constructing proxy variables from recorded log data within a Learning Management System (LMS), which represents adult learners' time management strategies in an online course. Based on previous research, three variables of total login time, login frequency, and regularity of login interval were selected as…
Considering Materials Management in Construction: An Exploratory Study
Directory of Open Access Journals (Sweden)
Zakaria Dakhli
2018-03-01
Full Text Available While materials count for a considerable amount of construction costs, the way materials are managed seems to be improvised rather than approached methodically. This study investigates the practice of novel techniques used to manage materials in the construction industry. Techniques that have already proven themselves to be efficient ways to manage the production pace within the industry include the pull system, Just-In-Time, Kitting and off-site fabrication. These are explained and assessed in the context of the French construction industry through an exploratory study, supported by a questionnaire completed by contractors. The results reveal that a clear plan to manage materials on-site is lacking among the respondents, creating common inventory problems. This research provides evidence to support the central role played by an efficient management of material flow on-site. It also highlights the obstacles that hinder the adoption of innovative techniques, such as sub-contractor coordination.
A proposed model for construction project management ...
African Journals Online (AJOL)
Keywords: Communication skills and leadership model, construction project ..... help a manager handle stress and break tension (Gido & Clements,. 2012: 331; Harrin .... production and management of projects, the higher the demand for.
Managing Multiple Forms of Employment in the Construction Sector
DEFF Research Database (Denmark)
Raja, Jawwad; D. Green, Stuart; Leiringer, Roine
2013-01-01
different contracting arrangements impinge on attempts to reposition human resource management (HRM) as a strategic function along the business partnering model. Elevating the role of the HR function is found to be difficult to reconcile with the concurrent demands of managing multiple forms of employment......The construction industry is one of the largest and most complex industrial sectors in the UK. The industry's failure to adopt progressive human resource (HR) practices is routinely blamed on the challenges of operating in a fragmented, project-based environment reliant on subcontracting...
Portfolio management for investment projects in the construction industry
Directory of Open Access Journals (Sweden)
Kozlov Alexander
2017-01-01
Full Text Available The Russian business community has realized the need for project/targeted programme management procedures; therefore, the demand for customized project-oriented management methods goes up. In the meantime, this demand is not supplied in full, and the supply is far from being efficient. Project management methodologies need further improvement, including development of portfolio management processes applicable to investment projects developed and implemented in the construction industry. The article considers General approaches to the formalization of the management of portfolios of investment–construction projects. For the main groups of processes portfolio management (“Formation and alignment”, “Monitoring and control” and “Support and development” deals with their constituent sub-processes. The proposed decomposition can be used for both portfolio construction and investment projects and also has an invariant character, which allows extending the proposed approaches to other system target–oriented and project–oriented management.
Management of construction safety at KKNPP site
International Nuclear Information System (INIS)
Khare, P.K.
2016-01-01
Construction is considered as one of the most hazardous activities owing to the number of accidents and injuries. At KKNPP, management of industrial safety has been envisaged since the preliminary stage of construction planning, including design aspects. The governing principles of safety management are evolved from the Factories Act, 1948, the Atomic Energy(Factories) Rules, 1996, AERB safety guidelines on Control of works (2011) and Corporate HSE policy of NPCIL (2014). Numerous risk assessment and hazard control measures are adopted consistently to ensure a safe work environment during the construction, which includes Job Hazard Analysis, work permit through Computerized Maintenance Management System, safety procedures, exclusive safety training facility for the contractor's workmen, safety motivational measures, safety surveillance and reporting through Safety Related Deficiencies Management System. Assessment of efficacy of safety management system is continuously done through safety audits and observations are being circulated and discussed in committee meetings. Fire safety is also being taken care of since inception of project work. Well-equipped fire station with trained fire fighters was made available since the beginning as per AERB safety standard on fire protection system for Nuclear facilities. Fire prevention measures specific to the work are implemented during all activities. (author)
Decision problems in management of construction projects
Szafranko, E.
2017-10-01
In a construction business, one must oftentimes make decisions during all stages of a building process, from planning a new construction project through its execution to the stage of using a ready structure. As a rule, the decision making process is made more complicated due to certain conditions specific for civil engineering. With such diverse decision situations, it is recommended to apply various decision making support methods. Both, literature and hands-on experience suggest several methods based on analytical and computational procedures, some less and some more complex. This article presents the methods which can be helpful in supporting decision making processes in the management of civil engineering projects. These are multi-criteria methods, such as MCE, AHP or indicator methods. Because the methods have different advantages and disadvantages, whereas decision situations have their own specific nature, a brief summary of the methods alongside some recommendations regarding their practical applications has been given at the end of the paper. The main aim of this article is to review the methods of decision support and their analysis for possible use in the construction industry.
Repository construction management and quality assurance
International Nuclear Information System (INIS)
Hood, F.C.
1984-01-01
An emphasis on preventive rather than reactive management is key to an efficient construction management operation. Development of contingency plans to deal with unexpected adverse conditions, e.g., brine pockets during mining operations, are an integral part of the management program to ensure project safety, quality, cost, schedule and environmental objectives are met. A viable quality assurance program with active management support will optimize management effectiveness in reaching project goals. With adequate planning and perceptive application of the proper management controls, Quality Assurance becomes an essential ingredient for efficiently managing a job because it has been built into the management system rather than being an uninvolved peripheral entity. 6 references, 3 figures
Wu, Zezhou; Yu, Ann T W; Shen, Liyin
2017-02-01
The abundant generation of construction and demolition (C&D) waste presents a significant challenge to the sustainable development of the construction industry in Mainland China. As the implementer of construction activities, the contractor's C&D waste management performance plays an important role in C&D waste minimization. This paper aims to investigate the determinants of the contractor's C&D waste management behavior in Mainland China. The Theory of Planned Behavior (TPB) was selected as the basis of the theoretical model. In addition, three contextual constructs (i.e., economic viability, governmental supervision, and project constraints) were introduced, formulating the initial model. Based on the initial model, eight constructs were identified and seven hypotheses were proposed. A questionnaire survey was conducted to collect data and a Structural Equation Modeling (SEM) analysis was employed to test the proposed hypotheses. Results showed that the C&D waste management intention is not a significant determinant of contractor's C&D waste management behavior. The most important determinant is economic viability, followed by governmental supervision as the second most important determinant. Nevertheless, the construct of project constraints is an insignificant determinant for contractor's adoption of C&D waste management behavior. The research findings imply that, in Mainland China, the government, at this stage, plays an important role in guiding and promoting the contractor to exhibit better C&D waste management behavior. Copyright © 2016 Elsevier Ltd. All rights reserved.
2006-01-01
The implementation of an effective performance-based construction quality management requires a tool for determining impacts of construction quality on the life-cycle performance of pavements. This report presents an update on the efforts in the deve...
Waste Management in Industrial Construction: Investigating Contributions from Industrial Ecology
Larissa A. R. U. Freitas; Alessandra Magrini
2017-01-01
The need for effective construction waste management is growing in importance, due to the increasing generation of construction waste and to its adverse impacts on the environment. However, despite the numerous studies on construction waste management, recovery of construction waste through Industrial Symbiosis and the adoption of other inter-firm practices, comprised within Industrial Ecology field of study, have not been fully explored. The present research aims to investigate Industrial Ec...
Planning construction of integrative schedule management for nuclear power project
International Nuclear Information System (INIS)
Zeng Zhenglin; Wang Wenying; Peng Fei
2012-01-01
This paper introduces the planning construction of integrative schedule management for Nuclear Power Project. It details schedule management system and the requirement of schedulers and the mode of three schedule management flats. And analysis it combing with the implementation of construction water and all special schedules before FCD to further propose the improving and researching direction for the integrative schedule management. (authors)
Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping
2018-03-01
System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.
Leveraging Text Content for Management of Construction Project Documents
Alqady, Mohammed
2012-01-01
The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…
Behavior-based safety on construction sites: a case study.
Choudhry, Rafiq M
2014-09-01
This work presents the results of a case study and describes an important area within the field of construction safety management, namely behavior-based safety (BBS). This paper adopts and develops a management approach for safety improvements in construction site environments. A rigorous behavioral safety system and its intervention program was implemented and deployed on target construction sites. After taking a few weeks of safety behavior measurements, the project management team implemented the designed intervention and measurements were taken. Goal-setting sessions were arranged on-site with workers' participation to set realistic and attainable targets of performance. Safety performance measurements continued and the levels of performance and the targets were presented on feedback charts. Supervisors were asked to give workers recognition and praise when they acted safely or improved critical behaviors. Observers were requested to have discussions with workers, visit the site, distribute training materials to workers, and provide feedback to crews and display charts. They were required to talk to operatives in the presence of line managers. It was necessary to develop awareness and understanding of what was being measured. In the process, operatives learned how to act safely when conducting site tasks using the designed checklists. Current weekly scores were discussed in the weekly safety meetings and other operational site meetings with emphasis on how to achieve set targets. The reliability of the safety performance measures taken by the company's observers was monitored. A clear increase in safety performance level was achieved across all categories: personal protective equipment; housekeeping; access to heights; plant and equipment, and scaffolding. The research reveals that scores of safety performance at one project improved from 86% (at the end of 3rd week) to 92.9% during the 9th week. The results of intervention demonstrated large decreases in
The four roles of supply chain management in construction
Vrijhoef, R.; Koskela, L.
2000-01-01
It is argued that due to construction peculiarities, supply chain management has four specific roles in construction. Practical initiatives in each role to advance the construction supply chain are analysed. The present status of construction supply chains is investigated by means of case studies
An initial investigation on the challenges of managing construction workforce in Saudi Arabia
Al-Emad, N.; Rahman, I. A.
2017-11-01
Most of the construction workers in Saudi Arabia are foreigners from several countries having different knowledge, skills and cultures. These create challenges to administer the workers in ensuring project success. This paper presents an initial investigation to uncover the challenges faced by construction professionals in managing construction workforce in Saudi Arabia. It describes insight processes of handling the workforce during planning stage, recruitment procedures and construction stage based on interview with senior manager who are well experienced in handling mega construction projects in Saudi Arabia. The interview was carried out in semi structured mode where the interviewee was given ample time to express the experiences encountered in dealing the workforce issue. This preliminary work able to identify among important issues related to construction workers are restrictions to non-Muslim skilled workers, limited visa quota, being away from family, delay in salary payment, cheating of workers skill’s status, safety issues, communication barriers and living conditions. Hence, these issues require quality leadership attributes such as continuous empathy with workers, respectful, trustful, sincere, reliable, good communication skills and problem solving skills. These findings are useful to construction practitioners and also research work related to construction leadership in handling worker’s issues.
Development as an effective management system construction and investment projects
Directory of Open Access Journals (Sweden)
Beloborodov Roman S.
2011-02-01
Full Text Available The article presents the material of the application of the conception «Development» as the effective methodology of the investment-construction project management within the framework the systems approach. Theoretical principles of the application of this conception are generalized and systematized based on the example of the creation of the low habitable complex.
Occupational health management system: A study of expatriate construction professionals.
Chan, I Y S; Leung, M Y; Liu, A M M
2016-08-01
Due to its direct impact on the safety and function of organizations, occupational health has been a concern of the construction industry for many years. The inherent complexity of occupational health management presents challenges that make a systems approach essential. From a systems perspective, health is conceptualized as an emergent property of a system in which processes operating at the individual and organizational level are inextricably connected. Based on the fundamental behavior-to-performance-to-outcome (B-P-O) theory of industrial/organizational psychology, this study presents the development of an I-CB-HP-O (Input-Coping Behaviors-Health Performance-Outcomes) health management systems model spanning individual and organizational boundaries. The model is based on a survey of Hong Kong expatriate construction professionals working in Mainland China. Such professionals tend to be under considerable stress due not only to an adverse work environment with dynamic tasks, but also the need to confront the cross-cultural issues arising from expatriation. A questionnaire was designed based on 6 focus groups involving 44 participants, and followed by a pilot study. Of the 500 questionnaires distributed in the main study, 137 valid returns were received, giving a response rate of 27.4%. The data were analyzed using statistical techniques such as factor analysis, reliability testing, Pearson correlation analysis, multiple regression modeling, and structural equation modeling. Theories of coping behaviors and health performance tend to focus on the isolated causal effects of single factors and/or posits the model at single, individual level; while industrial practices on health management tend to focus on organizational policy and training. By developing the I-CB-HP-O health management system, incorporating individual, interpersonal, and organizational perspectives, this study bridges the gap between theory and practice while providing empirical support for a
Environmental management systems - before, during and after construction
International Nuclear Information System (INIS)
Braun, T.L.
1997-01-01
The purpose of this paper is to describe an operational environmental managment system (EMS) as developed by TransCanada PipeLines, including an example of the application and concomitant benefits. The focus will be on the planning, construction, inspection and post-construction monitoring programs, covering approximately 3,190 kilometers of large diameter pipeline constructed between 1990 and 1996, across a wide range of Canadian land-uses and ecosystems. With the implementation of such systems, governments have recognized that corporate responsibility and self-management on environmental matters can result in effective, environmentally sound programs that minimize impacts and allow for a more cost-effective and streamlined regulatory approach. (au)
The construction of enterprise content management platform
International Nuclear Information System (INIS)
Liu Diyong
2010-01-01
The paper introduces the content management platform development background and the construction mode of Sanmen Nuclear Power Co., Ltd. It also proposes the system design architecture, especially focuses on the implementation of the project, the key technical issues and the project management experience. In addition, it describes how to classify, manage and use the unformatted information, digital assets and documents. (author)
Processes in construction of failure management expert systems from device design information
Malin, Jane T.; Lance, Nick
1987-01-01
This paper analyzes the tasks and problem solving methods used by an engineer in constructing a failure management expert system from design information about the device to te diagnosed. An expert test engineer developed a trouble-shooting expert system based on device design information and experience with similar devices, rather than on specific expert knowledge gained from operating the device or troubleshooting its failures. The construction of the expert system was intensively observed and analyzed. This paper characterizes the knowledge, tasks, methods, and design decisions involved in constructing this type of expert system, and makes recommendations concerning tools for aiding and automating construction of such systems.
Experiences from implementation of ICT for resource management in small construction companies
DEFF Research Database (Denmark)
Svidt, Kjeld; Christiansson, Per
2006-01-01
This paper summarizes experiences from the process of implementation of ICT-based systems for resource management in small construction companies. The initial decision process, system requirements specification and integration, education and staff training, and end user experiences were followed ...
School Construction Management: Expert Administrators Speak.
Fickes, Michael
2001-01-01
Presents expert opinion on school construction management communication concerning educational needs, obtaining consensus among diverse groups, and envisioning what schools must offer in the future. Why furniture issues are also important is highlighted. (GR)
Risk Management in Construction Project: Taking Fairness into Account
Górecki, Jarosław; Bizon-Górecka, Jadwiga
2017-10-01
Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises
A Research on the Construction of University R&D Management Team in China
Jia, Ning
2007-01-01
The system of Chinese universities R&D as a branch of the system of the whole country R&D, has a great effect on the development and innovation of the country's science and technique. Consequently, it's important to construct an effective management team with high diathesis for University R&D management. Based on the statistics of the…
A review of risk management process in construction projects of developing countries
Bahamid, R. A.; Doh, S. I.
2017-11-01
In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.
Review of Qualitative Approaches for the Construction Industry: Designing a Risk Management Toolbox
Spee, Ton; Gillen, Matt; Lentz, Thomas J.; Garrod, Andrew; Evans, Paul; Swuste, Paul
2011-01-01
Objectives This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Methods Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. Results This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. Conclusion The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions. PMID:22953194
Review of qualitative approaches for the construction industry: designing a risk management toolbox.
Zalk, David M; Spee, Ton; Gillen, Matt; Lentz, Thomas J; Garrod, Andrew; Evans, Paul; Swuste, Paul
2011-06-01
This paper presents the framework and protocol design for a construction industry risk management toolbox. The construction industry needs a comprehensive, systematic approach to assess and control occupational risks. These risks span several professional health and safety disciplines, emphasized by multiple international occupational research agenda projects including: falls, electrocution, noise, silica, welding fumes, and musculoskeletal disorders. Yet, the International Social Security Association says, "whereas progress has been made in safety and health, the construction industry is still a high risk sector." Small- and medium-sized enterprises (SMEs) employ about 80% of the world's construction workers. In recent years a strategy for qualitative occupational risk management, known as Control Banding (CB) has gained international attention as a simplified approach for reducing work-related risks. CB groups hazards into stratified risk 'bands', identifying commensurate controls to reduce the level of risk and promote worker health and safety. We review these qualitative solutions-based approaches and identify strengths and weaknesses toward designing a simplified CB 'toolbox' approach for use by SMEs in construction trades. This toolbox design proposal includes international input on multidisciplinary approaches for performing a qualitative risk assessment determining a risk 'band' for a given project. Risk bands are used to identify the appropriate level of training to oversee construction work, leading to commensurate and appropriate control methods to perform the work safely. The Construction Toolbox presents a review-generated format to harness multiple solutions-based national programs and publications for controlling construction-related risks with simplified approaches across the occupational safety, health and hygiene professions.
Construction safety management guide for use with DOE Order 440.1
International Nuclear Information System (INIS)
1997-01-01
DOE Order (DOE O) 440.1, Worker Protection Management for DOE Federal and Contractor Employees, establishes the framework for an effective worker protection program to reduce or eliminate accidental losses, injuries, and illnesses by providing workers with places of employment free of recognized hazards. In addition to prescribing program requirements applicable to all activities performed by DOE and its contractors, DOE O 440.1 provides specific requirements applicable only to construction activities. The intent of these construction-specific requirements is to compel the proactive management of construction safety on a project-by-project basis and, to the greatest extent possible, integrate the management of safety and health, both in terms of project personnel and management methodologies, with the management of the other primary elements of construction project performance: quality, cost and schedule
Critical analysis of procurement techniques in construction management sectors
Tiwari, Suman Tiwari Suresh; Chan, Shiau Wei; Faraz Mubarak, Muhammad
2018-04-01
Over the last three decades, numerous procurement techniques have been one of the highlights of the Construction Management (CM) for ventures, administration contracting, venture management as well as design and construct. Due to the development and utilization of those techniques, various researchers have explored the criteria for their choice and their execution in terms of time, cost and quality. Nevertheless, there is a lack of giving an account on the relationship between the procurement techniques and the progressed related issues, for example, supply chain, sustainability, innovation and technology development, lean construction, constructability, value management, Building Information Modelling (BIM) as well as e-procurement. Through chosen papers from the reputable CM-related academic journals, the specified scopes of these issues are methodically assessed with the objective to explore the status and trend in procurement related research. The result of this paper contributes theoretically as well as practically to the researchers and industrialist in order to be aware and appreciate the development of procurement techniques.
Project and Production Management in the Construction Industry
Chien-Ho Ko
2012-01-01
In this issue, the Journal of Engineering, Project, and Production Management (EPPM-Journal) presents five original research papers related to project and production management in the construction industry from authors in Africa, Asia, and Europe.
Rowlinson, Steve; Jia, Yunyan Andrea
2014-04-01
Existing heat stress risk management guidelines recommended by international standards are not practical for the construction industry which needs site supervision staff to make instant managerial decisions to mitigate heat risks. The ability of the predicted heat strain (PHS) model [ISO 7933 (2004). Ergonomics of the thermal environment analytical determination and interpretation of heat stress using calculation of the predicted heat strain. Geneva: International Standard Organisation] to predict maximum allowable exposure time (D lim) has now enabled development of localized, action-triggering and threshold-based guidelines for implementation by lay frontline staff on construction sites. This article presents a protocol for development of two heat stress management tools by applying the PHS model to its full potential. One of the tools is developed to facilitate managerial decisions on an optimized work-rest regimen for paced work. The other tool is developed to enable workers' self-regulation during self-paced work.
An Overview of Total Quality Management (TQM) practice in Construction Sector
Likita, A. J.; Zainun, N. Y.; Rahman, I. Abdul; Awal, A. S. M. Abdul; Alias, A. R.; Rahman, M. Q. Abdul; Ghazali, F. E. Mohamed
2018-04-01
In construction sector TQM can be termed as a philosophy which guides construction professionals on the proper execution of construction projects in terms of quality. The aim of this paper is to discuss on quality management practice in construction sector. This paper evaluated five previous researches and the findings were discussed to find a conclusion of TQM practise in construction sector. The study found that TQM had been successfully practice in construction sector at Saudi Arabia, India, US and South Africa. Application of Artificial Neural Network (ANN) help to improve the implementation of TQM in construction sector. In conclusion, quality management practices will give better control of processes in construction sector.
Directory of Open Access Journals (Sweden)
Ming Li
2017-09-01
Full Text Available Prefabricated construction, a new direction for the future development of the Chinese construction industry, can maximize the requirements of “green”. As a new form of green building, prefabricated construction is of particular interest. On account of the immature development of the green building market in China, the investment risk for prefabricated construction is higher than for traditional architecture. Hence, it is especially important to improve its investment risk identification and management. This study adopts system dynamics and builds a risk identification feedback chart and risk flow chart, to comprehensively identify investment risks that projects in China may face and to process quantitative estimation of investment risk factors. Key factors influencing project investment risks are found, and corresponding measures are pointedly proposed. This paper may provide guidance and a reference for promoting the sound development of prefabricated construction in China.
Directory of Open Access Journals (Sweden)
Kuo-Wei Hsu
2018-06-01
Full Text Available The bamboo-art industry in Taiwan’s Jhushan Township is inseparable from local life. In the face of local industrial-development difficulties in smaller towns, the Taiwan government aimed to achieve a range of (redevelopment goals using eco-museums as collaboration platforms and required such museums to combine their operations management with cultural preservation, local industrial development, and local residents’ goals. As such, the likely future performance of such operations management has emerged as a crucially important factor in decision-making about whether such museums should be constructed. This study, therefore, reviews the relevant literature on the operations-management performance of museums, with special attention to eco-museums, and proposes an operations-management performance measurement framework for eco-museums based on that review and a two-stage questionnaire administered to experts. The first stage utilized the Fuzzy Delphi Method, which focuses on impact factors, and the second, the Analytica Network Process Method, deals with performance factors. The results indicate that the key impacts on the performance of eco-museums and their operations management were, in order of importance, (1 community symbiosis, (2 cultural inheritance, and (3 regional revitalization. The preservation of cultural heritage, local identity, and community participation are the most important criteria in the operations management of eco-museums, and Jhushan Town can promote such museums through these guidelines.
Relational approach in managing construction project safety: a social capital perspective.
Koh, Tas Yong; Rowlinson, Steve
2012-09-01
Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.
Assessment of supply chain management in Nigerian construction ...
African Journals Online (AJOL)
This paper on assessment of supply Chain Management (SCM) in Effective Project ... in Imo state focused on identifying the challenges of construction supply chain ... and diverse objective were ranked highest whereas unfair risk allocation and poor ... The study recommends that construction stakeholders should embrace ...
Need of risk management practice amongst bumiputera contractors in Malaysia construction industries
Syuhada Fadzil, Nur; Noor, Nurazuwa Md; Rahman, Ismail Abdul
2017-11-01
Malaysia construction industry has been growing continuously with double-digit growth for the past two decades. There are many issues surrounded the industry such as delay in delivery, cost overrun, quality and safety. In bumiputera contractor’s context, the literature review found that 32 issues were encountered in the construction project. These issues can be handled properly with the application of risk management. According to previous researchers, application of risk management in Malaysia construction industry is at the low level where it is implemented in traditional ways that are brainstorming and checklist. These were due to lack of knowledge, the high cost of hiring experts and avoiding extra cost. Besides that, this study also intentions to analyse the risk categories in the construction industry as well as identify risk management process to resolve the construction issues. Hence, this paper presents issues engulfed by Bumiputera contractors which can partly be resolved by applying risk management practice in carrying out the construction activity. This may inspire the contractors to apply the risk management practice in ensuring the success of their construction project.
Improvement of Construction Project Management Processes
Directory of Open Access Journals (Sweden)
Nazarko, J.
2017-07-01
Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.
Management of waste from packaging of construction materials in building construction works
González Pericot, Natalia; Río Merino, Mercedes del
2011-01-01
Every material arriving at the construction site comes protected in some type of packaging, fundamentally cardboard, plastic or wood, and presently the great majority of these packagings finish in a container mixed with the rest of waste of the construction work. The increasing tendency to use prefabricated materials increases the volume of packaging necessary in product transport; in addition, the traditional materials also arrive more protected with packaging. A specific management for ...
Critical management practices influencing on-site waste minimization in construction projects.
Ajayi, Saheed O; Oyedele, Lukumon O; Bilal, Muhammad; Akinade, Olugbenga O; Alaka, Hafiz A; Owolabi, Hakeem A
2017-01-01
As a result of increasing recognition of effective site management as the strategic approach for achieving the required performance in construction projects, this study seeks to identify the key site management practices that are requisite for construction waste minimization. A mixed methods approach, involving field study and survey research were used as means of data collection. After confirmation of construct validity and reliability of scale, data analysis was carried out through a combination of Kruskal-Wallis test, descriptive statistics and exploratory factor analysis. The study suggests that site management functions could significantly reduce waste generation through strict adherence to project drawings, and by ensuring fewer or no design changes during construction process. Provision of waste skips for specific materials and maximisation of on-site reuse of materials are also found to be among the key factors for engendering waste minimization. The result of factor analysis suggests four factors underlying on-site waste management practices with 96.093% of total variance. These measures include contractual provisions for waste minimization, waste segregation, maximisation of materials reuse and effective logistic management. Strategies through which each of the underlying measures could be achieved are further discussed in the paper. Findings of this study would assist construction site managers and other site operatives in reducing waste generated by construction activities. Copyright © 2016 Elsevier Ltd. All rights reserved.
Risk management in the construction industry: a new literature review
Directory of Open Access Journals (Sweden)
Renault Berenger Y.
2016-01-01
Full Text Available The construction industry is well known as a highly risk prone industry owing to the complexity of its activities and dynamic project environments generating an atmosphere of risks that must be taken into consideration in the decision process. For this reason, we have developed this treatise to elucidate the fundamentals of risk management through a concise new proposal of literature review for risk management in construction. Our explanation of this is venture is that over the years, this area has been acknowledged as a crucial process in the business institutions and the most discussed subject among experts and researchers in the construction sector. We have tried in this report to present the most recent studies considering the impossibility to present all definitions of the concept of risk. This study is mainly a literature review; it looks at the literature relating to the concept of risk, risk management in construction as well as methods used in construction industry.
Effectiveness of Quality Management System (QMS) on Construction Projects
Behnam Neyestani
2016-01-01
Quality management system (QMS) provides generic guidance and requirements for establishing an appropriate quality management procedure, in order to lower cost, increase productivity, customer's satisfaction, and market share in the organizations since the last two-decade. In construction industry, it can assist the companies to achieve successfully their objectives, and ensure that all phases of construction project consistently meet client's requirements (need). The main aim of this article...
Towards a Competency-based Vision for Construction Safety Education
Pedro, Akeem; Hai Chien, Pham; Park, Chan Sik
2018-04-01
Accidents still prevail in the construction industry, resulting in injuries and fatalities all over the world. Educational programs in construction should deliver safety knowledge and skills to students who will become responsible for ensuring safe construction work environments in the future. However, there is a gap between the competencies current pedagogical approaches target, and those required for safety in practice. This study contributes to addressing this issue in three steps. Firstly, a vision for competency-based construction safety education is conceived. Building upon this, a research scheme to achieve the vision is developed, and the first step of the scheme is initiated in this study. The critical competencies required for safety education are investigated through analyses of literature, and confirmed through surveys with construction and safety management professionals. Results from the study would be useful in establishing and orienting education programs towards current industry safety needs and requirements
Effectiveness of Practicing Supply Chain Management in Construction Site
Directory of Open Access Journals (Sweden)
Mamter S.
2014-01-01
Full Text Available Construction Supply chain management comprised of the network of organization involved in the different processes and activities which produce the material, components and services that come together to design, procurement and deliver a building. It also consists of different organizations involved in the construction process including client/owner, designer, contractor, subcontractor and suppliers. This paper shall present on the implementation of supply chain management in construction and the effectiveness of practicing SCM in construction site. A field study is done from the viewpoint of contractor and consultant then analysed by using average index methods and presented in a statistical analysis. From the analysis, it reveals that effectiveness of practicing the SCM give a lot of good performances and granted benefits to contractor. The statistical analysis produced first ranking effectiveness of SCM is can minimize waste of material and labor for construction project.
An appraisal of construction management practice in Nigeria | Ugwu ...
African Journals Online (AJOL)
An appraisal of construction management practice in Nigeria. ... 108 questionnaires were distributed to the key construction actors as follows: 45 to ... conflicting design information, effective co-ordination of resources, critical path method, ...
Elizar, Suripin, Wibowo, Mochamad Agung
2017-11-01
Delays in construction sites occur due to systematic additions of time waste in various activities that are part of the construction process. Work-time waste is non-adding value activity which used to differentiate between physical construction waste found on site and other waste which occurs during the construction process. The aim of this study is identification using the concept of Value Stream Mapping (VSM) to reduce of work-time waste as applied the smart construction management.VSM analysis is a method of business process improvement. The application of VSM began in the manufacturing community. The research method base on theoretically informed case study and literature review. The data have collected using questionnaire through personal interviews from 383 respondents on construction project in Indonesia. The results show that concept of VSM can identify causes of work-time waste. Base on result of questioners and quantitative approach analysis was obtained 29 variables that influence of work-time waste or non-value-adding activities. Base on three cases of construction project founded that average 14.88% of working time was classified as waste. Finally, the concept of VSM can recommend to identification of systematic for reveal current practices and opportunities for improvement towards global challenges. The concept of value stream mapping can help optimize to reduce work-time waste and improve quality standard of construction management. The concept is also can help manager to make a decision to reduce work-time waste so as to obtain of result in more efficient for performance and sustainable construction project.
Strengthening of nuclear power plant construction safety management
International Nuclear Information System (INIS)
Yu Jun
2012-01-01
The article describes the warning of the Fukushima nuclear accident, and analyzes the major nuclear safety issues in nuclear power development in China, problems in nuclear power plants under construction, and how to strengthen supervision and management in nuclear power construction. It also points out that the development of nuclear power must attach great importance to the safety, and nuclear power plant construction should strictly implement the principle of 'safety first and quality first'. (author)
Study on nuclear power plant project construction and management mode in China
International Nuclear Information System (INIS)
Wang Kai; Chen Lian
2009-01-01
Project management mode plays a key role in project construction, especially in nuclear power field. From the aspects of right, responsibility and benefit, this paper discussed the differences among the common used project management modes. Also the main kinds of the construction management modes used in China's nuclear power plants were summarized. At last, considering the experience of Ningde nuclear power plant, this paper put forward several perspectives about the selection of project management mode in nuclear power plant construction. (authors)
Life cycle assessment of construction and demolition waste management
DEFF Research Database (Denmark)
Butera, Stefania; Christensen, Thomas Højlund; Astrup, Thomas Fruergaard
2015-01-01
Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed...... of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most...... of the impact assessment was critical for modelling the leaching impacts. Compared with the overall life cycle of building and construction materials, leaching emissions were shown to be potentially significant for toxicity impacts, compared with contributions from production of the same materials, showing...
A proposed model for construction project management ...
African Journals Online (AJOL)
Log in or Register to get access to full text downloads. ... (decision-making, problem-solving, listening, verbal competency, motivation, persuasion, ... Keywords: Communication skills and leadership model, construction project management, ...
Construction management of Indian pressurized heavy water reactors
International Nuclear Information System (INIS)
Bohra, S.A.; Sharma, P.D.
2006-01-01
Pandit Jawaharlal Nehru and Dr. Homi J. Bhabha, the visionary architects of Science and Technology of modern India foresaw the imperative need to establish a firm base for indigenous research and development in the field of nuclear electricity generation. The initial phase has primarily focused on the technology development in a systematic and structured manner, which has resulted in establishment of strong engineering, manufacturing and construction base. The nuclear power program started with the setting up of two units of boiling light water type reactors in 1969 for speedy establishment of nuclear technology, safety culture, and development of operation and maintenance manpower. The main aim at that stage was to demonstrate (to ourselves, and indeed to the rest of the world) that India, inspite of being a developing country, with limited industrial infrastructure and low capacity power grids, could successfully assimilate the high technology involved in the safe and economical operation of nuclear power reactors. The selection of a BWR was in contrast to the pressurized heavy water reactors (PHWR), which was identified as the flagship for the first stage of India's nuclear power program. The long-term program in three stages utilizes large reserves of thorium in the monazite sands of Kerala beaches in the third stage with first stage comprising of series of PHWR type plants with a base of 10,000 MW. India has at present 14 reactors in operation 12 of these being of PHWR type. The performance of operating units of 2720 MW has improved significantly with an overall capacity factor of about 90% in recent times. The construction work on eight reactor units with installed capacity of 3960 MW (two PHWRs of 540 MW each, four PHWRs of 220 MW each and two VVERs of 1000 MW each) is proceeding on a rapid pace with project schedules of less than 5 years from first pour of concrete. This is being achieved through advanced construction technology and management. Present
Thille, Patricia H; Russell, Grant M
2010-10-01
Current visions of family medicine and models of chronic illness management integrate evidence-based medicine with collaborative, patient-centered care, despite critiques that these constructs conflict with each other. With this potential conflict in mind, we applied a critical discursive psychology methodology to present discursive patterns articulated by 13 family physicians in Ontario, Canada, regarding care of patients living with multiple chronic illnesses. Physicians constructed competing versions of the terms "effective chronic illness management" and "patient involvement." One construction integrated individual responsibility for health with primacy of "evidence," resulting in a conceptualization consistent with paternalistic care. The second constructed effective care as involving active partnership of physician and patient, implying a need to foster the ability of both practitioners and patients to respond to complex challenges as they arose. The former pattern is inconsistent with visions of family medicine and chronic illness management, whereas the latter embodies it.
Implementation of Risk Management in Malaysian Construction Industry: Case Studies
Abdul-Rahman, Hamzah; Wang, Chen; Sheik Mohamad, Farhanim
2015-01-01
Construction industries are exposed to wide array of risks, such as financial, design, and contractual ones, which might have a direct impact on their performance toward achieving the desired objectives. Risk Management is a proactive decision-making process used to minimize and manage the risks in the most efficient and appropriate manner. However, most construction firms in Malaysia do not apply formal risk management in their projects. Thus, this study aims to identify the actual process o...
High-rise construction in the Russian economy: modeling of management decisions
Miroshnikova, Tatyana; Taskaeva, Natalia
2018-03-01
The growth in the building industry, particularly in residential high-rise construction, is having considerable influence on the country's economic development. The scientific hypothesis of the research is that the execution of town-planning programs of high-rise construction depends to a large extent on the management of the provision of material resources for the construction of a millionth city, while the balance model is the most important tool for establishing and determining the ratio between supply and demand for material resources. In order to improve the efficiency of high-rise building management, it is proposed to develop a methodology for managing the provision of construction of large cities with material resources.
The context of innovation management in construction firms
Hartmann, Andreas
2006-01-01
Conscious management of innovation in construction firms is becoming more and more a necessity. However, the possibilities and ways to successfully put an innovative idea into practice depend on a range of contingencies. A framework of innovation management was devised to structure the context
International Nuclear Information System (INIS)
Johnson, J.V.
1995-01-01
A prioritization process is used to evaluate and rank proposed construction projects within the Department of Energy's Waste Management program. The process is used to determine which projects should proceed with conceptual design activities. The proposed construction projects are evaluated against a set of criteria which reflect Waste Management priorities. A management review team ranks and scores the projects thereby generating a prioritized list of projects. Despite decreasing budgets and changing political climates, the process has been a successful decision-aiding tool for selecting construction projects to carry out the Waste Management mission within the Department of Energy
Experience-based innovations in management of nuclear power plant technology
International Nuclear Information System (INIS)
Wagner, R.L.; Bradbury, R.B.; Freeman, D.V.; Jacobs, S.B.
1987-01-01
During 45 years of nuclear technology development and experience, Stone and Webster (S and W) has developed and successfully applied various innovative techniques to numerous nuclear projects. These techniques, developed primarily in response to the increasing scope and complexity of nuclear power plants, have been used and refined to provide efficient management of the two major nuclear project acticities-design and construction. For this paper, these techniques have been divided into: 1) engineering-based innovations, 2) construction-based innovations, and 3) management-based innovations. (author)
Experience-based innovations in management of nuclear power plant technology
International Nuclear Information System (INIS)
Wagner, R.L.; Bradbury, R.B.; Freeman, D.V.; Jacobs, S.B.
1988-01-01
During 45 years of nuclear technology development and experience, Stone and Webster (S and W) has developed and successfully applied various innovative techniques to numerous nuclear projects. These techniques, developed primarily in response to the increasing scope and complexity of nuclear power plants, have been used and refined to provide efficient management of the two major nuclear project activities - design and construction. For this paper, these techniques have been divided into: (1) engineering-based innovations, (2) construction-based innovations, and (3) management-based innovations
Alingh, Carien W; Strating, Mathilde M H; van Wijngaarden, Jeroen D H; Paauwe, Jaap; Huijsman, Robbert
2018-03-06
Nursing management is considered important for patient safety. Prior research has predominantly focused on charismatic leadership styles, although it is questionable whether these best characterise the role of nurse managers. Managerial control is also relevant. Therefore, we aimed to develop and test a measurement instrument for control-based and commitment-based safety management of nurse managers in clinical hospital departments. A cross-sectional survey design was used to test the newly developed questionnaire in a sample of 2378 nurses working in clinical departments. The nurses were asked about their perceptions of the leadership behaviour and management practices of their direct supervisors. Psychometric properties were evaluated using confirmatory factor analysis and reliability estimates. The final 33-item questionnaire showed acceptable goodness-of-fit indices and internal consistency (Cronbach's α of the subscales range: 0.59-0.90). The factor structure revealed three subdimensions for control-based safety management: (1) stressing the importance of safety rules and regulations; (2) monitoring compliance; and (3) providing employees with feedback. Commitment-based management consisted of four subdimensions: (1) showing role modelling behaviour; (2) creating safety awareness; (3) showing safety commitment; and (4) encouraging participation. Construct validity of the scale was supported by high factor loadings and provided preliminary evidence that control-based and commitment-based safety management are two distinct yet related constructs. The findings were reconfirmed in a cross-validation procedure. The results provide initial support for the construct validity and reliability of our ConCom Safety Management Scale. Both management approaches were found to be relevant for managing patient safety in clinical hospital departments. The scale can be used to deepen our understanding of the influence of patient safety management on healthcare professionals
Directory of Open Access Journals (Sweden)
Entisar K. Al-Geelawee
2016-06-01
Full Text Available Total quality management considers one of the modern scientific entrances which practiced by productivity service organizations alike to provide appropriate quality required outputs according to the needs and desires of customers manage , enable the organization seeking to continue and grow in light of the increasing competition from the satisfy and provide the appropriate total quality management requirements whenever led to face risks that they may have in a manner in which they can be addressed and find ways to avoid them in the future when repeated. The research has consist of two main parts firstly have included a review of the most important concepts of total quality management in addition to the concept of risk analysis and management in construction projects and how to apply the concept of total quality management in the risk analysis and management. Second part included the practical part of the research, which was open and closed questionnaire for experts in the construction industry to obtain required informations for the application of total quality management requirements in risk management in construction projects in Iraq. One of the main findings of the research is that top management support has a high impact on risk management in addition to continuous improvement, training and education, while the participation of all employees in the organization and constant stimulation and focusing on the customer as one of the total quality management requirements had a moderate impact on risk management.
International Nuclear Information System (INIS)
Wu Yan; Liu Shuqing
2010-01-01
Building nuclear power enterprises need huge investment , often tens of billions RMB. How to do a good job in corporate debt risk management, becoming powerful large-scale development of nuclear power ,ensuring the supply of funds and existing debt service in the process of large-scale development of nuclear power ,is an important task. In this paper, managing the company's debt is very urgent and necessary through analysis of SMNPC financing and debt structure; through the analysis of SMNPC's debt risk management , the authors would like to explore how to build up the framework of the debt management under the large-scale development of nuclear power construction . Nuclear power enterprises need to strengthen supervision mechanism and internal control,build-up and perfect all-round debt risk manage system, keep watch on debt risk in order to ensure preservation and increment of the value of state assets. (authors)
Occupational safety and health management in the construction industry: a review.
Jaafar, Mohd Hafiidz; Arifin, Kadir; Aiyub, Kadaruddin; Razman, Muhammad Rizal; Ishak, Muhammad Izzuddin Syakir; Samsurijan, Mohamad Shaharudin
2017-09-11
The construction industry plays a significant role in contributing to the economy and development globally. During the process of construction, various hazards coupled with the unique nature of the industry contribute to high fatality rates. This review refers to previous published studies and related Malaysian legislation documents. Four main elements consisting of human, worksite, management and external elements which cause occupational accidents and illnesses were identified. External and management elements are the underlying causes contributing to occupational safety and health (OSH), while human and worksite elements are more apparent causes of occupational accidents and illnesses. An effective OSH management approach is required to contain all hazards at construction sites. An approach to OSH management constructed by elements of policy, process, personnel and incentive developed in previous work is explored. Changes to the sub-elements according to previous studies and the related Malaysian legislation are also covered in this review.
Al-Sari, Majed I; Al-Khatib, Issam A; Avraamides, Marios; Fatta-Kassinos, Despo
2012-02-01
As a step towards comprehending what drives the management of construction waste in the occupied Palestinian territory, this paper quantifies construction waste generation and examines how the local contractors' waste management attitudes and behaviour are influenced. Collection of data was based on a survey, carried out in the southern part of the West Bank between April and May 2010. The survey targeted contractors who specialized in the construction of buildings. A logistic regression model was used to investigate the relationship between various attributes and the attitudes and behaviour that the local contractors demonstrate towards waste management. The results showed that during the construction of buildings, 17 to 81 kg of construction waste are generated per square metre of building floor. Although the area of a building is the key factor determining 74.8% of the variation of construction waste generation, the employment of labour-intensive techniques in the study area means that human factors such as the contractor's attitude and behaviour towards waste management, exert a key influence on waste generation. Attitudes towards the 3Rs of waste minimization and behaviour towards waste disposal are generally positive with smaller contractors exhibiting more positive attitudes and more satisfactory behaviour towards waste management. Overall, while contractors' behaviour towards waste sorting and disposal tends to be more satisfactory among contractors who are more conscious about the potential environmental impacts of construction waste, it was generally observed that in the absence of a regulatory framework, the voluntary attitudes and behaviour among the local contractors are mostly driven by direct economic considerations.
Jamaludin, Amril Hadri; Karim, Nurulzatushima Abdul; Noor, Raja Nor Husna Raja Mohd; Othman, Nurulhidayah; Malik, Sulaiman Abdul
2017-08-01
Construction waste management (CWM) is the practice of minimizing and diverting construction waste, demolition debris, and land-clearing debris from disposal and redirecting recyclable resources back into the construction process. Best practice model means best choice from the collection of other practices that was built for purpose of construction waste management. The practice model can help the contractors in minimizing waste before the construction activities will be started. The importance of minimizing wastage will have direct impact on time, cost and quality of a construction project. This paper is focusing on the preliminary study to determine the factors of waste generation in the construction sites and identify the effectiveness of existing construction waste management practice conducted in Malaysia. The paper will also include the preliminary works of planned research location, data collection method, and analysis to be done by using the Analytical Hierarchy Process (AHP) to help in developing suitable waste management best practice model that can be used in the country.
Manowong, Ektewan
2012-01-01
Rapid economic growth and urbanization in developing countries lead to extensive construction activities that generate a large amount of waste. A challenge is how to manage construction waste in the most sustainable way. In the developing world, research on construction waste management is scarce and such academic knowledge needs to be responsive to actual practices in the industry in order to be implemented. As construction projects involve a number of participants and stakeholders, their participation and commitment can have a major influence on the goals of green and sustainable construction for urban development. This study provides a significant step in conducting a very first research of this kind in Thailand by aiming to investigate the level of construction stakeholders' commitment as well as the achievement of construction waste management in order to improve short-term practices and to establish a long-term strategic construction waste management plan. In this study, a structural equation model was employed to investigate the influence of factors that are related to environmental aspects, social aspects, and economic aspect of construction waste management. Concern about health and safety was found to be the most significant and dominant influence on the achievement of sustainable construction waste management. Other factors affecting the successful management of construction waste in Thai construction projects were also identified. It is perceived that this study has potential to contribute useful guidelines for practitioners both in Thailand and other developing countries with similar contexts.
Construction management research at the interface of design and explanatory science
Voordijk, Johannes T.
2011-01-01
Purpose – The purpose of this study is to characterize construction management research at the interface of explanatory science and design science. Design/methodology/approach – The dual nature of construction management research is analyzed by relating this field of research to natural science,
20th International Symposium on Advancement of Construction Management and Real Estate
Zheng, Sheng; Luo, Jiaojiao; Wang, Wei; Mo, Zhibin; Shan, Liping
2017-01-01
These conference proceedings offer an outstanding resource for academics and professionals, sharing essential findings on the latest developments in real estate and construction management. The subject is “Advancement of Construction Management and Real Estate” in the context of new-type urbanization. The Chinese Research Institute of Construction Management (CRIOCM), working in close collaboration with Zhejiang University, organized CRIOCM2015, the 20th International Symposium. Written by academics and professionals from all over the world, these proceedings discuss the latest achievements, research outputs and advances between frontier disciplines in the field of construction management and real estate. They cover a wide range of topics, including new-type urbanization, land development and land use, urban development and management, the real estate market and housing policies. The discussions will provide an important reference source on the implementation of new-type urbanization in China and abroad.
International Nuclear Information System (INIS)
Sasaki, Yutaka; Tsumura, Isamu; Hayashi, Minoru; Nakamoto, Kenji
2005-01-01
The construction management system aims to have information on the construction management between the Chugoku Electric Power Co. Inc. and each contractor, and to work efficiently. The system has been operating during about half year. The system manages the manufacturing process, safety and quality. The aims, development process, characteristics, network construction of the system are reported. As outline of the construction management system, functions and construction management of each process, safety and quality and ITV camera are explained. The system will be used at construction of Shimane nuclear power station unit-3. (S.Y.)
Needs Assessment--A Construction Management Bachelor of Science Degree in Alaska.
Gunderson, D. E.; Ra, J. W.; Schroeder, H.; Holland, H. R.
2002-01-01
Responses from 99 Alaskan contractors identified the number of entry-level construction management personnel needed, salaries, and desired skills. Skills identified will be used to develop a construction management curriculum specific to the Alaskan environment. Findings correlate with research predicting supply and demand for graduates nationwide…
Directory of Open Access Journals (Sweden)
Graham Martin
2011-11-01
Full Text Available A large-scale workplace-based suicide prevention and early intervention program was delivered to over 9,000 construction workers on building sites across Queensland. Intervention components included universal General Awareness Training (GAT; general mental health with a focus on suicide prevention; gatekeeper training provided to construction worker volunteer ‘Connectors’; Suicide First Aid (ASIST training offered to key workers; outreach support provided by trained and supervised MIC staff; state-wide suicide prevention hotline; case management service; and postvention support provided in the event of a suicide. Findings from over 7,000 workers (April 2008 to November 2010 are reported, indicating strong construction industry support, with 67% building sites and employers approached agreeing to participate in MIC. GAT participants demonstrated significantly increased suicide prevention awareness compared with a comparison group. Connector training participants rated MIC as helpful and effective, felt prepared to intervene with a suicidal person, and knew where to seek help for a suicidal individual following the training. Workers engaged positively with the after-hours crisis support phone line and case management. MIC provided postvention support to 10 non-MIC sites and sites engaged with MIC, but not yet MIC-compliant. Current findings support the potential effectiveness and social validity of MIC for preventing suicide in construction workers.
Gullestrup, Jorgen; Lequertier, Belinda; Martin, Graham
2011-01-01
A large-scale workplace-based suicide prevention and early intervention program was delivered to over 9,000 construction workers on building sites across Queensland. Intervention components included universal General Awareness Training (GAT; general mental health with a focus on suicide prevention); gatekeeper training provided to construction worker volunteer ‘Connectors’; Suicide First Aid (ASIST) training offered to key workers; outreach support provided by trained and supervised MIC staff; state-wide suicide prevention hotline; case management service; and postvention support provided in the event of a suicide. Findings from over 7,000 workers (April 2008 to November 2010) are reported, indicating strong construction industry support, with 67% building sites and employers approached agreeing to participate in MIC. GAT participants demonstrated significantly increased suicide prevention awareness compared with a comparison group. Connector training participants rated MIC as helpful and effective, felt prepared to intervene with a suicidal person, and knew where to seek help for a suicidal individual following the training. Workers engaged positively with the after-hours crisis support phone line and case management. MIC provided postvention support to 10 non-MIC sites and sites engaged with MIC, but not yet MIC-compliant. Current findings support the potential effectiveness and social validity of MIC for preventing suicide in construction workers. PMID:22163201
Rowlinson, Steve; Yunyanjia, Andrea; Li, Baizhan; Chuanjingju, Carrie
2014-05-01
Climatic heat stress leads to accidents on construction sites brought about by a range of human factors emanating from heat induced illness, and fatigue leading to impaired capability, physical and mental. It is an occupational characteristic of construction work in many climates and the authors take the approach of re-engineering the whole safety management system rather than focusing on incremental improvement, which is current management practice in the construction industry. From a scientific viewpoint, climatic heat stress is determined by six key factors: (1) air temperature, (2) humidity, (3) radiant heat, and (4) wind speed indicating the environment, (5) metabolic heat generated by physical activities, and (6) "clothing effect" that moderates the heat exchange between the body and the environment. By making use of existing heat stress indices and heat stress management processes, heat stress risk on construction sites can be managed in three ways: (1) control of environmental heat stress exposure through use of an action-triggering threshold system, (2) control of continuous work time (CWT, referred by maximum allowable exposure duration) with mandatory work-rest regimens, and (3) enabling self-paced working through empowerment of employees. Existing heat stress practices and methodologies are critically reviewed and the authors propose a three-level methodology for an action-triggering, localized, simplified threshold system to facilitate effective decisions by frontline supervisors. The authors point out the need for "regional based" heat stress management practices that reflect unique climatic conditions, working practices and acclimatization propensity by local workers indifferent geographic regions. The authors set out the case for regional, rather than international, standards that account for this uniqueness and which are derived from site-based rather than laboratory-based research. Copyright © 2013 Elsevier Ltd. All rights reserved.
The impact of project management on nuclear construction lead times
International Nuclear Information System (INIS)
Radlaver, M.A.; Bauman, D.S.; Chapel, S.W.
1985-01-01
A two-year study of lead times for nuclear power plants found that construction time is affected by six fundamental influences. One of the six is project management. An analysis of construction management teams at 26 nuclear units found that many of the most successful shared five general characteristics: nuclear power experience, skill in project control, adaptability and initiative, commitment to success, and communication and coordination skill
Rauscher, Kimberly J; Schulman, Michael; Runyan, Carol W
2010-01-01
The objective of this study was to examine the reported practices of construction firms and the beliefs of firm managers/supervisors with respect to employing youth under age 18 and ensuring their safety. The participants in this study were firm representatives from 54, mostly small to medium sized, construction firms in North Carolina. Survey responses were analyzed for the entire sample and within strata of firm size (1-10, 11+ employees) using descriptive statistics. Percentages and 95% confidence intervals were calculated. Chi-square tests were used to test for statistical significance in differences between firm sizes. The findings suggest limits in the adequacy of safety training given to youth in construction, particularly in light of the minimal experience firms require of young hires, that managers' beliefs about the causes of young worker injury are largely focused on worker behaviors rather than on the presence of hazards, and that managers' compliance with child labor laws may be hampered by their lack of knowledge of these laws and an ambivalence toward their usefulness and enforcement. While larger studies are needed to confirm and advance these findings, when considered along with prior studies, they demonstrate the need to improve the safety of the construction environment for youth. The development of new educational interventions by health and safety professionals targeted at construction firms are supported, as are efforts by government regulators to increase enforcement and employer knowledge of the child labor laws.
Welcoming high reliability organising in construction management
olde Scholtenhuis, Léon Luc; Doree, Andries G.; Smith, S.D.; Ahiaga-Dagbui, D.D.
2013-01-01
To achieve project objectives, construction project managers have to manoeuvre through complex coordination structures. They have to simultaneously deal with limited budgets, tight schedules, demanding stakeholders and a fragmented supply-chain. Despite their extensive coordination efforts, project
Logistic description of investment and construction management
Directory of Open Access Journals (Sweden)
Sborshchikov Sergey Borisovich
2014-01-01
Full Text Available The article is devoted to the questions of defining dynamic behavior of investment and construction activity as a technical and economic system and its formalized description. It is offered to use the term "condition vector" as one of the main characteristics while describing investment and construction activity. Logistic interpretation of a sustainable development of investment and construction defines the concept of optimum trajectory, which considers various dependencies of its components (construction operations, their preparation, design, material, technique, personnel, information, investment, etc.. It is necessary to point out that this state is homeostatic, which means, the managing system must provide continuous monitoring of each system component of investment and construction activities in accordance with the sustainable development pathway. The concept of dynamic balance used in logistics is identical to the concept of homeostatic balance, which is accepted in system engineering. It is defined as a property of technical and economic system, which implies that its deviations from the development pathway lie within admissible values.
Model-based version management system framework
International Nuclear Information System (INIS)
Mehmood, W.
2016-01-01
In this paper we present a model-based version management system. Version Management System (VMS) a branch of software configuration management (SCM) aims to provide a controlling mechanism for evolution of software artifacts created during software development process. Controlling the evolution requires many activities to perform, such as, construction and creation of versions, identification of differences between versions, conflict detection and merging. Traditional VMS systems are file-based and consider software systems as a set of text files. File based VMS systems are not adequate for performing software configuration management activities such as, version control on software artifacts produced in earlier phases of the software life cycle. New challenges of model differencing, merge, and evolution control arise while using models as central artifact. The goal of this work is to present a generic framework model-based VMS which can be used to overcome the problem of tradition file-based VMS systems and provide model versioning services. (author)
Research of Manufacture Time Management System Based on PLM
Jing, Ni; Juan, Zhu; Liangwei, Zhong
This system is targeted by enterprises manufacturing machine shop, analyzes their business needs and builds the plant management information system of Manufacture time and Manufacture time information management. for manufacturing process Combined with WEB technology, based on EXCEL VBA development of methods, constructs a hybrid model based on PLM workshop Manufacture time management information system framework, discusses the functionality of the system architecture, database structure.
Directory of Open Access Journals (Sweden)
Benedict Amade
2017-04-01
Full Text Available This study sought to delineate SCM features using the analytical hierarchy process (AHP with a view to incorporating it into the delivery of construction projects in Nigeria. The study adopted an exploratory research design (quantitative and qualitative methods. A purposive and convenient sampling technique was deployed with the aid of semi-structured interview, case study; questionnaire survey in a construction firm in Port-Harcourt, Rivers State, Nigeria. Questionnaires were used to collect primary data after being pre-tested via a pilot study for validity and reliability. The data collected were analysed using the AHP. Findings from the study shows that the following features are key; Instituting trust and long term relationships amongst supply chain partners (ITP, supply chain finance (SCF, supply chain and continuous performance measurement (SCCPM, information technology (IT, quality management (QM, supply base management (SBM, senior management’s commitment (SMC and supply chain orientation (SCO. In delivering construction projects to success using the SCM approach, adequate attention and emphasis should be accorded to the aforementioned important features in the order they appear as they would aid in effecting the much needed success. It is also expected that the features would further be beneficial to construction firms as it would enable the firms to manage, measure and evaluate the gains ensuing from the deployment of SCM techniques.
SYSTEM OF STANDARTIZATION OF CONSTRUCTION OPERATIONS ARRANGEMENT
Directory of Open Access Journals (Sweden)
Oleynik Pavel Pavlovich
2012-10-01
Full Text Available In the proposed article, management of construction operations is represented as a multi-level system; it is considered with the framework of projects including new construction, restructuring and overhaul of buildings and structures. The system of management of construction operations is to be composed of the following three constituent parts. They include a construction and assembling entity, project and operations, and a procurement base. Such matters as the quality of construction products, purchase (lease of building machinery and vehicles are incorporated into the level of the construction and assembling entity. The project level comprises such components of construction operations management as pre-construction preparation of a project, methods and forms of construction management, preparatory works, management of construction activities, real-time operations control, construction quality control, etc. The level of operations and the procurement base covers the needs for materials and equipment, their purchase and procurement, as well as the warehouse management. The main elements of the standardization system are identified. Standards of construction operations management are explained, including 1. General Provisions; 2. Preparation and performance of construction and assembling works; 3. New construction. Building site organization; 4. Demolition (dismantling of buildings and structures; 5. Rules of preparation for acceptance and commissioning of completed residential buildings. The prospects for the further development of the system of standardization of construction operations management are outlined
Improvement of the material and transport component of the system of construction waste management
Kostyshak, Mikhail; Lunyakov, Mikhail
2017-10-01
Relevance of the topic of selected research is conditioned with the growth of construction operations and growth rates of construction and demolition wastes. This article considers modern approaches to the management of turnover of construction waste, sequence of reconstruction or demolition processes of the building, information flow of the complete cycle of turnover of construction and demolition waste, methods for improvement of the material and transport component of the construction waste management system. Performed analysis showed that mechanism of management of construction waste allows to increase efficiency and environmental safety of this branch and regions.
Efficiency potential of management and technical solutions for a construction object
Directory of Open Access Journals (Sweden)
Lapidus Azariy Abramovich
2014-01-01
Full Text Available The authors investigate the models of efficiency potential of management and technical solutions for a construction object, which allows accounting for the influence of management-technological and administrative solutions in the process of implementing construction project. The solutions are represented by various factors – solitary integral potentials. The factors, which should be taken into account in the process of developing an integral model, are: development of general contracting structure, project decisions, management decisions, administrative decisions and ecological impact. In is necessary to develop the model, which will integrally put together the above mentioned factors of a construction project, observe and investigate other factors, create a model and get the opportunity not only to predict the endpoint of the future construction object on the stage of formulating technological requirements, but also to monitor the changes of this prognosis in time. The parameters of the integral potential will allow the system to obtain flexibility, which makes it possible to adjust to the changes usually taking place on a construction object and at the same time to aim for optimization of organizational, technological and administrative solutions in the process of reaching endpoint of construction.
International Nuclear Information System (INIS)
Wang Lining; Li Jingmin; Ma Ding; Tu Haitao
2015-01-01
Based on Hongyanhe nuclear power plant in Liaoning province, the paper studies the anti-freeze and heat tracing work of BOP project. It compares several different heat tracing solutions in terms of technicality and applicability, and gave the most suitable scheme by using electrical tracing. It also presents the construction details of the electrical tracing system, analyzes the key points of the construction management from quantity, safety and schedule aspects, and gave the improvement suggestions. (authors)
Construct validation of supply chain management in cooperative
Idris, Nurjihan; Arshad, Fatimah Mohamed; Radam, Alias; Ali, Noor Azman
2009-01-01
This study attempts to analyze construct in supply chain and to determine which construct contribute to performance of agricultural cooperatives in Malaysia. The primary data is collected via questionnaire from top level management of agricultural cooperatives using 5-item Likert scale. Factor analysis and structural equations modeling were used to analyze the data. Findings show that cooperatives places importance on quality and technology, logistic, supplier and governance. As a whole, supp...
Managing engineering to meet construction requirements
International Nuclear Information System (INIS)
Martin, D.F.; Houchen, J.D.
1976-01-01
The San Onofre Units 2 and 3 Project schedule is compared with Bechtel's Generic Nuclear Power Plant schedule. This comparison shows that the major delays experienced on the San Onofre Project have resulted from the regulatory process. To date, Engineering has met Construction's requirements and the Project has not experienced any Engineering related delays. The San Onofre Project has been faced with many uncertainties, such as limited site area, high seismic design criteria, new and changing Federal and State regulations, shifts in supplier market conditions and unpredictable supplier performance. Each of these uncertainties has impacted the Engineering effort and jeopardized project schedule goals. The SCE-Bechtel Engineering Management team has acted to mitigate the impact of these uncertainties through use of a cost trend program, simplification of SCE-Bechtel interfaces, close Engineering-Construction coordination, the use of task forces to handle critical supplier problems and the use of additional Engineering personnel, etc. so that Construction requirements have been met
Fluid management in space construction
Snyder, Howard
1989-01-01
The low-g fluids management group with the Center for Space Construction is engaged in active research on the following topics: gauging; venting; controlling contamination; sloshing; transfer; acquisition; and two-phase flow. Our basic understanding of each of these topics at present is inadequate to design space structures optimally. A brief report is presented on each topic showing the present status, recent accomplishings by our group and our plans for future research. Reports are presented in graphic and outline form.
Probabilistic analysis in the life cycle management of construction deficiencies
International Nuclear Information System (INIS)
Zebroski, E.; Starr, C.
1985-01-01
The author discusses the urgent need for better systems and procedures for evaluating actual or suspected construction deficiencies in nuclear power plants. The following topics of interest are discussed: summary of tools available, use of plant-specific probabilistic risk assessments, general process for the rational management of construction deficiencies, rationales for the timing of required corrective actions, example of deficiency management in France, proposed screening process, deficiencies calling for corrective actions, institutional obstacles, and specific recommendations
Xing, Yuanzhi; Deng, Xiaoyi
2017-11-01
The paper first has defined the concepts of green supply chain management and evolution game theory, and pointed out the characteristics of green supply chain management in construction. The main participants and key links of the construction green supply chain management are determined by constructing the organization framework. This paper established the evolutionary game model between construction enterprises and recycling enterprises for the green supply chain closed-loop structure. The waste recycling evolutionary stability equilibrium solution is obtained to explore the principle and effective scope of government policy intervention. This paper put forward the relevant countermeasures to the green supply chain management in construction recycling stage from the government point of view. The conclusion has reference value and guidance to the final product construction enterprises, recycling enterprises and the government during green supply chain.
Management self-assessment in construction phase of nuclear power station
International Nuclear Information System (INIS)
Shao Bixiu
2004-01-01
Management self-assessment is one of the quality management methods to achieve the organization's continuous improvement. Through the investigation of the methods, the author hopes to give guideline to the management at all levels involved in the construction of nuclear power station in the implementation of management self-assessment, and also to make the management self-assessment more normalized, systematical and effective
Some problems of NPP construction base improvement
International Nuclear Information System (INIS)
Movchan, S.V.
1984-01-01
NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction
On the effectiveness in implementing a waste-management-plan method in construction
International Nuclear Information System (INIS)
Tam, Vivian W.Y.
2008-01-01
The increasing awareness of waste management concerns from construction and demolition waste has led to the development of waste management as an important function of construction project management. The Hong Kong government started employing the implementation of a waste-management-plan (WMP) method for all construction projects in 2003. During the trial period, the government received different version of feedback from the industry. It also came out that detailed descriptions of waste management procedures in the WMP method largely affect the productivity of companies. This paper investigates the effectiveness of the existing implementation of the WMP method in the Hong Kong construction industry. A questionnaire survey and structured interviews were conducted. The result showed that 'Propose methods for on-site reuse of materials' and 'Propose methods for reducing waste' are the main benefits gained from the implementation of the WMP method. However, 'Low financial incentive' and 'Increase in overhead cost' are considered as the major difficulties in the implementation. From that, 'Use of prefabricated building components' is considered as the major effective measure to encourage the implementation of the WMP method
Strategies, methods and tools for managing nanorisks in construction
López de Ipiña, J. M.; Vaquero, C.; Boutry, D.; Damlencourt, J. F.; Neofytou, P.; Pilou, M.; Jankowska, E.; Larraza, I.; Pina, R.; Fernández, S.; Contreras, S.; Romero, A.; Calderon, M.; Swiezewsk, P.; Otkallo, K.; Pintea, A.; Salazar, C.; Oroz, T.; Hargreaves, B.; Ciobanu, R.; Tabrea, A.; Hazebrouck, B.; Salvi, O.; Stockmann-Juvala, H.; Vaananen, V.; Pui, D. H. Y.; Thompson, Drew
2015-05-01
This paper presents a general overview of the work carried out by European project SCAFFOLD (GA 280535) during its 30 months of life, with special emphasis on risk management component. The research conducted by SCAFFOLD is focused on the European construction sector and considers 5 types of nanomaterials (TiO2, SiO2, carbon nanofibres, cellulose nanofibers and nanoclays), 6 construction applications (Depollutant mortars, selfcompacting concretes, coatings, self-cleaning coatings, fire resistant panels and insulation materials) and 26 exposure scenarios, including lab, pilot and industrial scales. The document focuses on the structure, content and operation modes of the Risk Management Toolkit developed by the project to facilitate the implementation of “nano-management” in construction companies. The tool deploys and integrated approach OHSAS 18001 - ISO 31000 and is currently being validated on 5 industrial case studies.
Strategies, methods and tools for managing nanorisks in construction
International Nuclear Information System (INIS)
De Ipiña, J M López; Vaquero, C; Boutry, D; Damlencourt, J F; Neofytou, P; Pilou, M; Jankowska, E; Larraza, I; Pina, R; Fernández, S; Contreras, S; Romero, A; Calderon, M; Swiezewsk, P; Otkallo, K; Pintea, A; Salazar, C; Oroz, T; Hargreaves, B; Ciobanu, R
2015-01-01
This paper presents a general overview of the work carried out by European project SCAFFOLD (GA 280535) during its 30 months of life, with special emphasis on risk management component. The research conducted by SCAFFOLD is focused on the European construction sector and considers 5 types of nanomaterials (TiO 2 , SiO 2 , carbon nanofibres, cellulose nanofibers and nanoclays), 6 construction applications (Depollutant mortars, selfcompacting concretes, coatings, self-cleaning coatings, fire resistant panels and insulation materials) and 26 exposure scenarios, including lab, pilot and industrial scales. The document focuses on the structure, content and operation modes of the Risk Management Toolkit developed by the project to facilitate the implementation of “nano-management” in construction companies. The tool deploys and integrated approach OHSAS 18001 - ISO 31000 and is currently being validated on 5 industrial case studies. (paper)
Digital waterway construction based on inland electronic navigation chart
Wang, Xue; Pan, Junfeng; Zhu, Weiwei
2015-12-01
With advantages of large capacity, long distance, low energy consumption, low cost, less land occupation and light pollution, inland waterway transportation becomes one of the most important constituents of the comprehensive transportation system and comprehensive water resources utilization in China. As one of "three elements" of navigation, waterway is the important basis for the development of water transportation and plays a key supporting role in shipping economic. The paper discuss how to realize the informatization and digitization of waterway management based on constructing an integrated system of standard inland electronic navigation chart production, waterway maintenance, navigation mark remote sensing and control, ship dynamic management, and water level remote sensing and report, which can also be the foundation of the intelligent waterway construction. Digital waterway construction is an information project and also has a practical meaning for waterway. It can not only meet the growing high assurance and security requirements for waterway, but also play a significant advantage in improving transport efficiency, reducing costs, promoting energy conservation and so on. This study lays a solid foundation on realizing intelligent waterway and building a smooth, efficient, safe, green modern inland waterway system, and must be considered as an unavoidable problem for the coordinated development between "low carbon" transportation and social economic.
Directory of Open Access Journals (Sweden)
Hongwen He
2017-11-01
Full Text Available This paper presents a freeway driving cycle (FDC construction method based on traffic information. A float car collected different type of roads in California and we built a velocity fragment database. We selected a real freeway driving cycle (RFDC and established the corresponding time traffic information tensor model by using the data in California Department of Transportation performance measure system (PeMS. The correlation of road velocity in the time dimension and spatial dimension are analyzed. According to the average velocity of road sections at different times, the kinematic fragments are stochastically selected in the velocity fragment database to construct a real-time FDC of each section. The comparison between construction freeway driving cycle (CFDC and real freeway driving cycle (RFDC show that the CFDC well reflects the RFDC characteristic parameters. Compared to its application in plug-in electric hybrid vehicle (PHEV optimal energy management based on a dynamic programming (DP algorithm, CFDC and RFDC fuel consumption are similar within approximately 5.09% error, and non-rush hour fuel economy is better than rush hour 3.51 (L/100 km at non-rush hour, 4.29 (L/km at rush hour. Moreover, the fuel consumption ratio can be up to 13.17% in the same CFDC at non-rush hour.
Construction of test-bed system of voltage management system to ...
African Journals Online (AJOL)
Construction of test-bed system of voltage management system to apply physical power system. ... Journal of Fundamental and Applied Sciences ... system of voltage management system (VMS) in order to apply physical power system.
Trend-Analysis and Research Direction in Construction Management Literature
DEFF Research Database (Denmark)
Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev
2013-01-01
Planning and scheduling, both in the form of pre-assembly construction as well as increase in cost and time are all themes that haven’t been studies in a trend-analysis, with the purpose of finding gaps and research directions in the literature. The aim of this paper is therefor to analyze...... of Construction Engineering and Management....
International Nuclear Information System (INIS)
Wang Kaihua; Tang Zihui; Zhang Baiqi; Sun Guangwei; Zhu Guodong; Qian Fuhua
2009-01-01
This paper focuses on introducing the innovation achievements on the management information system of nuclear power construction (MISNPC). The innovation is achieved through summarizing the practice of nuclear power construction in China and drawing on advanced experience of international nuclear power construction. The innovation, including the management standard for nuclear power construction, the standard of construction process, the standard of nuclear-power basic codes and the standard for nuclear power construction and control, can be rapidly copied for application in various nuclear power construction projects. The application of the innovation may play an essential role in ensuring safe construction and operation of nuclear power plants in China and improving economic benefits. (authors)
Construction and management of ARDS/sepsis registry with REDCap.
Pang, Xiaoqing; Kozlowski, Natascha; Wu, Sulong; Jiang, Mei; Huang, Yongbo; Mao, Pu; Liu, Xiaoqing; He, Weiqun; Huang, Chaoyi; Li, Yimin; Zhang, Haibo
2014-09-01
The study aimed to construct and manage an acute respiratory distress syndrome (ARDS)/sepsis registry that can be used for data warehousing and clinical research. The workflow methodology and software solution of research electronic data capture (REDCap) was used to construct the ARDS/sepsis registry. Clinical data from ARDS and sepsis patients registered to the intensive care unit (ICU) of our hospital formed the registry. These data were converted to the electronic case report form (eCRF) format used in REDCap by trained medical staff. Data validation, quality control, and database management were conducted to ensure data integrity. The clinical data of 67 patients registered to the ICU between June 2013 and December 2013 were analyzed. Of the 67 patients, 45 (67.2%) were classified as sepsis, 14 (20.9%) as ARDS, and eight (11.9%) as sepsis-associated ARDS. The patients' information, comprising demographic characteristics, medical history, clinical interventions, daily assessment, clinical outcome, and follow-up data, was properly managed and safely stored in the ARDS/sepsis registry. Data efficiency was guaranteed by performing data collection and data entry twice weekly and every two weeks, respectively. The ARDS/sepsis database that we constructed and manage with REDCap in the ICU can provide a solid foundation for translational research on the clinical data of interest, and a model for development of other medical registries in the future.
End-to-end requirements management for multiprojects in the construction industry
DEFF Research Database (Denmark)
Wörösch, Michael
Performance Concrete and insulation materials – is used. By means of action research and interviews of case project staff it has become evident that many elements of formalized requirements management are missing in the case project. To fill those gaps and be able to manage requirements end...... with regards to requirements management. As the literature study gives little new information, a series of interviews are initiated with experts from industry and universities. Those interviews reveal major shortcomings in the way requirements are handled in Danish construction companies today. In order...... to give managers of construction projects a useful and guiding tool for formally managing requirements that is rooted in practice, the “Conceptual requirements management framework”, is created. The framework builds upon the gathered empirical data, obtained by action research, interviews, and available...
Begum, Rawshan Ara; Siwar, Chamhuri; Pereira, Joy Jacqueline; Jaafar, Abdul Hamid
2007-01-01
Malaysia is facing an increase in the generation of waste and of accompanying problems with the disposal of this waste. In the last two decades, extensive building and infrastructure development projects have led to an increase in the generation of construction waste material. The construction industry has a substantial impact on the environment, and its environmental effects are in direct relation to the quality and quantity of the waste it generates. This paper discusses general characteristics of the construction contractors, the contractors' willingness to pay (WTP) for improved construction waste management, determining factors which affect the amount of their willingness to pay, and suggestions and policy implications in the perspective of construction waste management in Malaysia. The data in this study is based on contractors registered with the construction industry development board (CIDB) of Malaysia. Employing the open ended contingent valuation method, the study assessed the contractors' average maximum WTP for improved construction waste management to be RM69.88 (1US$=3.6 RM) per tonne of waste. The result shows that the average maximum WTP is higher for large contractors than for medium and small contractors. The highest average maximum WTP value is RM88.00 for Group A (large contractors) RM78.25 for Group B (medium-size contractors) and RM55.80 for Group C (small contractors). One of the contributions of this study is to highlight the difference of CIDB registration grade in the WTP for improved construction waste management. It is found that contractors' WTP for improved waste collection and disposal services increases with the increase in contractors' current paid up capital. The identified factors and determinants of the WTP will assist the formulation of appropriate policies in addressing the construction waste problem in Malaysia and indirectly improve the quality of construction in the country.
Data processing project management in the construction of plants and power stations
International Nuclear Information System (INIS)
Huelsen, H.; Hayen, W.
1987-01-01
The requirements of project management in plant construction i.e. basic data, supervision and control became more and more detailed. These requirements can only satisfactorily be met with the help of data processing. Piping design requires up to 50% of the whole amount of engineering in design and management of plant construction. We present data processing project management system which explains the connections of single aspects. Its connections consists of: collection of basic data, plant design and installation, supervision of planning and installation, planning and calculation, collection, use, administration and approval of plan data, procurement material, construction of the model (1:25), and installation. (orig.) [de
Construct Validation of the Behavior and Instructional Management Scale
Martin, Nancy K.; Sass, Daniel A.
2010-01-01
Beliefs related to classroom management vary among teachers and play an important role in classrooms. Despite the importance of this construct, valid measures have proven difficult to develop. This study evaluated the psychometric properties of the Behavior and Instructional Management Scale (BIMS), a short but valid measure of teachers'…
Directory of Open Access Journals (Sweden)
Tran, Van
2012-04-01
Full Text Available Real Options (RO has been a universally accepted concept in a number of major industries. However, its use in the construction supply chain management (CSCM sector has been limited. Some rare supply chain management RO studies have shown a number of limitations. First, there is a lack of a rigorous theoretical RO framework pertaining specifically to CSCM. All such supply chain management RO studies are based off RO theories or models developed for other sectors (engineering, infrastructure, natural resources. And second, attempts to extend real option to wider uses in CSCM seem premature at the present. This paper reviews all recent literature pertaining to real options and real options applied specifically to the construction supply chain management area. The study proposes a research programme pertaining to CSCM in New Zealand in order to enhance the current understanding of RO in this area and in the process develop a comprehensive theory for the RO application in New Zealand CSCM.
Client's constraining factors to construction project management ...
African Journals Online (AJOL)
This study analyzed client's related factors that constrain project management success of public and private sector construction in Nigeria. Issues that concern clients in any project can not be undermined as they are the owners and the initiators of project proposals. It is assumed that success, failure or abandonment of ...
Dong, Yahui; Zhang, Pengwei; Li, Wei
To strengthen the informationization construction of the financial management has great significance to the achievement of business management informationization, and under the network economic environment, it is an important task of the financial management that how to conduct informationization construction of traditional financial management to provide true, reliable and complete financial information system for the business managers. This paper thoroughly researches the problem of financial information orientation management (FIOM) by taking the method of combining theory with practice. This paper puts forward the thinking method of financial information management, makes the new contents of E-finance. At last, this paper rebuilds the system of finance internal control from four aspects such as control of organization and management, system development control and safety control of network system.
Managing Conflict in The Nigerian Construction Industry: A Study of ...
African Journals Online (AJOL)
The study investigated the causes of conflictin the Nigerian construction industry and, the strategies for managing them in terms of resolutions and prevention. A quantitative approach using questionnaire survey was adopted to empirically test the opinions of construction professionals on causes of conflicts and ...
The weaknesses of China's contractors in overseas construction project management: 2 case studies
Directory of Open Access Journals (Sweden)
Ph. D. Mo Xuan
2012-05-01
Full Text Available The practices of international construction contracting have been prevalent increasingly over the past half a centuru, Altough the contractors of highly developed world have dominated this field, there tends to be more players from newly emerging countries like China. The history of China's contractors performing in the overseas construction markets is divided into 3 major phases, namely the planning economy era, reform and openness perios and the latest nwe millennium. However, the know-how and techniques of modern project management have been widely deployed in China for merely 2 decades. While competing with those veterans in overseas markets, China's contractors still lack adequate advantages as well as experiences, leading to the underperformance or even failures. A 2-dimension framework of overseas project management, comprising the external risk and internal function aspects , is proposed. Based on the analysis of 2 recent cases in Saudi Arabia an Poland respectively, it's foung that the low cost strategy management in risk, commerce, cost, human resources, etc. are their fatal weaknesses.
Core-firm Based View on the Mechanism of Constructing a Corporate Innovation Ecosystem
DEFF Research Database (Denmark)
Jiang, Shimei; Wang, Ziyuan; Hu, Yimei
2016-01-01
The fierce transformation of the competitive status of business world in the 21st century has urged the innovation activities turned from mechanistic and deterministic to ecological and organic. The study firstly defines the concept of core firm based on reviewing existing corporate innovation...... constructing a corporate innovation ecosystem through building up an innovation platform that include multi-level collaborative relationships based on different technologies; while at the same time integrating non-technological issues such as strategy, culture, management, organization, institution and market....... This research complements and extends literature on corporate innovation ecosystem, and provides implications to innovative companies on constructing a core firm based innovation ecosystem....
BASES OF CONSTRUCTIVITY OF MODERN PERSONALITY
Directory of Open Access Journals (Sweden)
Natalya Petrovna Shatalova
2014-11-01
Full Text Available Formation of bases of constructibility is important process at this stage of de-velopment of our state. Personality of modern type must be capable to self-determination, competent adoption of constructive decisions and manifestation of a personal responsibility for the constructive election, personality of modern type must be capable for self-determination, competent adoption of constructive decisions and manifestation to a personal responsibility for the constructive choice. Formation of bases of constructibility in the course of education is caused by use of constructive tasks and the constructive educational environment which define innovative recep-tions and skills of influence as methods of pedagogical influence taking into account constantly changing circumstances. Extent of mastering each member of society bases of constructibility defines a spiritual condition of society, of the present and the future of our country, development of economy and culture in general.Purpose: consideration of question about development of constructive thinking and constructive skills of personality in modern constructive educational environ-ment.Methodology: formal pedagogical method, the theoretical modeling, the meth-od of participant observation.Results. In the article is give the short analysis of problem of development of personality in modern society, opened the concept of constructibility of the personali-ty and her basic components, classification constructive tasks investigated, specified preparatory steps for organization of the conditions of development of a constructibil-ity and gives a brief description of their. Article has the scientific value as contains au-thor's generalizations possessing scientific novelty and the conclusions directed on disclosure of problems of formation and development of the modern personality, considered from the point of view of the theory of democratic constructivism in edu-cation.Practical implications: pedagogical
Xia Yao; Jianping Xie; Linchun He
2013-01-01
In the recent years, as an effective practice in university students’ entrepreneurship education, construction of university students’ entrepreneurship incubation base has been rapidly developed in different universities. This paper takes construction of the entrepreneurship incubation base in Sichuan Agricultural University as a case study, analyzes the current status of university students’ entrepreneurship incubation base and makes a discussion on establishment of management institution, f...
Methodology of project management at implementation of projects of high-rise construction
Papelniuk, Oksana
2018-03-01
High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.
Applying lean thinking in construction
Directory of Open Access Journals (Sweden)
Remon Fayek Aziz
2013-12-01
Full Text Available The productivity of the construction industry worldwide has been declining over the past 40 years. One approach for improving the situation is using lean construction. Lean construction results from the application of a new form of production management to construction. Essential features of lean construction include a clear set of objectives for the delivery process, aimed at maximizing performance for the customer at the project level, concurrent design, construction, and the application of project control throughout the life cycle of the project from design to delivery. An increasing number of construction academics and professionals have been storming the ramparts of conventional construction management in an effort to deliver better value to owners while making real profits. As a result, lean-based tools have emerged and have been successfully applied to simple and complex construction projects. In general, lean construction projects are easier to manage, safer, completed sooner, and cost less and are of better quality. Significant research remains to complete the translation to construction of lean thinking in Egypt. This research will discuss principles, methods, and implementation phases of lean construction showing the waste in construction and how it could be minimized. The Last Planner System technique, which is an important application of the lean construction concepts and methodologies and is more prevalent, proved that it could enhance the construction management practices in various aspects. Also, it is intended to develop methodology for process evaluation and define areas for improvement based on lean approach principles.
Auditing of suppliers as the requirement of quality management systems in construction
Harasymiuk, Jolanta; Barski, Janusz
2017-07-01
The choice of a supplier of construction materials can be important factor of increase or reduction of building works costs. Construction materials present from 40 for 70% of investment task depending on kind of works being provided for realization. There is necessity of estimate of suppliers from the point of view of effectiveness of construction undertaking and necessity from the point of view of conformity of taken operation by executives of construction job and objects within the confines of systems of managements quality being initiated in their organizations. The estimate of suppliers of construction materials and subexecutives of special works is formal requirement in quality management systems, which meets the requirements of the ISO 9001 standard. The aim of this paper is to show possibilities of making use of anaudit for estimate of credibility and reliability of the supplier of construction materials. The article describes kinds of audits, that were carried in quality management systems, with particular taking into consideration audits called as second-site. One characterizes the estimate criterions of qualitative ability and method of choice of the supplier of construction materials. The paper shows also propositions of exemplary questions, that would be estimated in audit process, the way of conducting of this estimate and conditionality of estimate.
Ranking the Project Management Success Factors for Construction Project in South India
Aneesha, K.; Haridharan, M. K.
2017-07-01
In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.
A project management quality cost information system for the construction industry
Love, PED; Irani, Z
2003-01-01
A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...
Causal Factors of Corruption in Construction Project Management: An Overview.
Owusu, Emmanuel Kingsford; Chan, Albert P C; Shan, Ming
2017-11-11
The development of efficient and strategic anti-corruption measures can be better achieved if a deeper understanding and identification of the causes of corruption are established. Over the past years, many studies have been devoted to the research of corruption in construction management (CM). This has resulted in a significant increase in the body of knowledge on the subject matter, including the causative factors triggering these corrupt practices. However, an apropos systematic assessment of both past and current studies on the subject matter which is needful for the future endeavor is lacking. Moreover, there is an absence of unified view of the causative factors of corruption identified in construction project management (CPM). This paper, therefore, presents a comprehensive review of the causes of corruption from selected articles in recognized construction management journals to address the mentioned gaps. A total number of 44 causes of corruption were identified from 37 publications and analyzed in terms of existing causal factors of corruption, annual trend of publications and the thematic categorization of the identified variables. The most identifiable causes were over close relationships, poor professional ethical standards, negative industrial and working conditions, negative role models and inadequate sanctions. A conceptual framework of causes of corruption was established, after categorizing the 44 variables into five unique categories. In descending order, the five constructs are Psychosocial-Specific Causes, Organizational-Specific Causes, Regulatory-Specific Causes, Project-Specific Causes and Statutory-Specific Causes. This study extends the current literature of corruption research in construction management and contributes to a deepened understanding of the causal instigators of corruption identified in CPM. The findings from this study provide valuable information and extended knowledge to industry practitioners and policymakers as well as
International Nuclear Information System (INIS)
Jiang Lirui; Wang Yinhui; Liu Feng; Zhu Yunfei; Song Jili
2014-01-01
The paper introduces the exploration and practices in TNPS data management system construction, data management system maturity model construction, management system maturity self-evaluation and data quality improvement, etc. Through the identification and illustration on TNPS data management functions and it also illustrates the effect of scientific management on the enterprise operation with the combination of the characteristics of Big Data Time. Then it looks into the prospect of the data management. (authors)
Information-based management mode based on value network analysis for livestock enterprises
Liu, Haoqi; Lee, Changhoon; Han, Mingming; Su, Zhongbin; Padigala, Varshinee Anu; Shen, Weizheng
2018-01-01
With the development of computer and IT technologies, enterprise management has gradually become information-based management. Moreover, due to poor technical competence and non-uniform management, most breeding enterprises show a lack of organisation in data collection and management. In addition, low levels of efficiency result in increasing production costs. This paper adopts 'struts2' in order to construct an information-based management system for standardised and normalised management within the process of production in beef cattle breeding enterprises. We present a radio-frequency identification system by studying multiple-tag anti-collision via a dynamic grouping ALOHA algorithm. This algorithm is based on the existing ALOHA algorithm and uses an improved packet dynamic of this algorithm, which is characterised by a high-throughput rate. This new algorithm can reach a throughput 42% higher than that of the general ALOHA algorithm. With a change in the number of tags, the system throughput is relatively stable.
Construction schedule management of China Experimental Fast Reactor
International Nuclear Information System (INIS)
Wang Yue
2012-01-01
China Experimental Fast Reactor (CEFR) in the first Fast Reactor in China, which is one of large project of the National High Technology Research and Development Program ('863' Program). On 21 st July 2011, CEFR had succeeded to connect to power grid, the target of construction had come true. To a large item, schedule management is one of the most important management, this paper a overall discussion about CEFR item. It has proved that the management of CEFR project is scientific, normative and high-efficiency, it will be valuable for lager Fast Reactor item and designers in interrelated field. (author)
Using management inquiry to co-construct other memories about the future
DEFF Research Database (Denmark)
Larsen, Mette Vinther; Willert, Søren
2017-01-01
on the acknowledgment that people in organizations have memories of the future. And it is argued that the prospective memories managers have of how an organizational dilemma will unfold in the nearby future shape their actions and co-construction of meaning in the present. In the article, we exemplify and explore how......The focal point in this article is to explore how management inquiry in the context of reflexive dialogical action research can be used as a way for researchers and managers to jointly construct knowledge that partakes in developing organizational life from “within.” This article builds...... researchers and managers by using “unadjusted responses” and “social poetics” as ways of gesturing and responding can engage in management inquiry and enhance the future managers remember to make room for more desirable future memories to emerge that expand managers’ possible space for action in the present....
Analysis of factors influencing safety management for metro construction in China.
Yu, Q Z; Ding, L Y; Zhou, C; Luo, H B
2014-07-01
With the rapid development of urbanization in China, the number and size of metro construction projects are increasing quickly. At the same time, and increasing number of accidents in metro construction make it a disturbing focus of social attention. In order to improve safety management in metro construction, an investigation of the participants' perspectives on safety factors in China metro construction has been conducted to identify the key safety factors, and their ranking consistency among the main participants, including clients, consultants, designers, contractors and supervisors. The result of factor analysis indicates that there are five key factors which influence the safety of metro construction including safety attitude, construction site safety, government supervision, market restrictions and task unpredictability. In addition, ANOVA and Spearman rank correlation coefficients were performed to test the consistency of the means rating and the ranking of safety factors. The results indicated that the main participants have significant disagreement about the importance of safety factors on more than half of the items. Suggestions and recommendations on practical countermeasures to improve metro construction safety management in China are proposed. Copyright © 2013 Elsevier Ltd. All rights reserved.
Ganbat, Tsenguun; Chong, Heap-Yih; Liao, Pin-Chao; Wu, You-Di
2018-01-01
International construction is complicated and involves high risks. However, with the development of technological innovation, Building Information Modeling (BIM) emerged and seems to be able to address certain risks. To understand BIM applications in risk management for international construction, a state-of-the-art review is required. Therefore, this paper aims to identify the research trends and opportunities for risk management in BIM-enabled international construction by reviewing 526 pee...
The use of production management techniques in the construction of large scale physics detectors
International Nuclear Information System (INIS)
Bazan, A.; Chevenier, G.; Estrella, F.
1999-01-01
The construction process of detectors for the Large Hadron Collider (LHC) experiments is large scale, heavily constrained by resource availability and evolves with time. As a consequence, changes in detector component design need to be tracked and quickly reflected in the construction process. With similar problems in industry engineers employ so-called Product Data Management (PDM) systems to control access to documented versions of designs and managers employ so-called Product Data Management (PDM) systems to control access to documented versions of designs and managers employ so-called Workflow Management Software (WfMS) to coordinate production work processes. However, PDM and WfMS software are not generally integrated in industry. The scale of LHC experiments, like CMS, demands that industrial production techniques be applied in detector construction. This paper outlines the major functions and applications of the CRISTAL system (Cooperating Repositories and an Information System for Tracking Assembly Lifecycles) in use in CMS which successfully integrates PDM and WfMS techniques in managing large scale physics detector construction. This is the first time industrial production techniques have been deployed to this extent in detector construction
Assessment of different construction and demolition waste management approaches
Directory of Open Access Journals (Sweden)
Manal S. Abdelhamid
2014-12-01
Full Text Available The waste generated from construction and demolition sites is considered one of the most irritating problems in Egypt. In the last 10 years some effort has been made toward solving this problem, the most outstanding is the newly issued Egyptian rating system “Green Pyramids Rating System”. It emphasizes on waste management and particularly “site provision and environment” which contributes to 75% of the management category score. However the traditional practice which is limited to dumping all the generated waste is still dominating. The absence of sustainable practices in construction sector in Egypt led to the lack in financial and environmental data. From strategic perspective, the research aims at developing a detailed procedure to evaluate two construction and demolition waste management approaches by means of Decision Matrix technique. A detailed study is introduced for the two approaches; for each approach a flow chart is developed to demonstrate its lifecycle, as well as the cost break down structure and the different stakeholders’ roles. A penetration discussion of the pros and cons for each approach was developed accordingly and came out with sixteen influencing attributes for both approaches. The previous steps paved the ground to construct a Decision Matrix to decide on one of the approaches from a strategic environmentally oriented perspective. The study relied on the detailed and deep demonstration of the two approaches to justify the assigned weight for attributes and scores for corresponding approach. From a strategic perspective, the decision came out in favor of the more environmentally friendly approach.
System dynamic modeling on construction waste management in Shenzhen, China.
Tam, Vivian W Y; Li, Jingru; Cai, Hong
2014-05-01
This article examines the complexity of construction waste management in Shenzhen, Mainland China. In-depth analysis of waste generation, transportation, recycling, landfill and illegal dumping of various inherent management phases is explored. A system dynamics modeling using Stella model is developed. Effects of landfill charges and also penalties from illegal dumping are also simulated. The results show that the implementation of comprehensive policy on both landfill charges and illegal dumping can effectively control the illegal dumping behavior, and achieve comprehensive construction waste minimization. This article provides important recommendations for effective policy implementation and explores new perspectives for Shenzhen policy makers.
Directory of Open Access Journals (Sweden)
Олег Александрович КУЧМА
2016-03-01
Full Text Available The authors consider the modeling of organizational structures by virtue of interaction between the basic participants by realizing of investment construction projects. This process is directed at the complex analysis of a problem of quality management by creating of building goods taking into account modern project management tendencies. The topicality of problem is obvious as by realizing of investment construction projects there is a liberal share of uncompleted projects, and in the completed projects actual values considerably exceed budgeted capital expenditures. The introduced model allows managing the project per quality system in all phases of the investment construction project‘s life cycle. It promotes refinement of building goods, improves the rate of successfully completed projects with actual values near budgeted.
Safety cost management in construction companies: A proposal classification.
López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C
2016-06-16
Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.
Analysis on Key Points of Construction and Management of Municipal Landscape Engineering
Liang, Mingxia; Fei, Cheng
2018-02-01
At present, China has made great efforts to promote the construction of ecological civilization and promote the development of ecological protection and environmental construction. It has important practical significance to maintain the ecological balance and environmental quality of our country. Especially with the gradual improvement in people’s awareness of environmental protection, so that the green of the city also put forward higher requirements at the same time with the rising of the level of urbanization. In the process of urban landscape construction, the rational planning of urban landscaping involves a lot of subject knowledge. In the green process, we should fully consider the system of urban development and construction in China, based on the design of urban development and long-term planning of the landscaping project. In addition, we must also consider the traditional layout of the city area and the physical and geographical situation and so on, to enhance the objective and scientific nature of urban landscape. Therefore, it is of great practical significance to ensure the quality of landscaping in the effective management of municipal landscape engineering.
Hirota, Yoichi
2007-01-01
The turnover of the Japanese contractors and the consulting firms has kept the same level since 1983, in spite of the fact that the size of domestic market is shrinking. This is why they do not have a proper management system, especially risk management system for the overseas construction projects. This study aims at building risk management system and developing education program that can be applied to reinforcing the ability, based on the author’s experience. Risk is defined as “uncertain ...
Directory of Open Access Journals (Sweden)
Jingxiao Zhang
2017-06-01
Full Text Available The purpose of this research is to quantitatively evaluate the growth phase, position, and priorities of the industrialization policy management of the construction industry at firm level. The goal is to integrate quantitative dynamics into the policy-making process for sustainable policy development in future China. This research proposes an integrated framework, including growth management model and industrial policy evaluation method, to identify the challenges of construction industrialization and policy management. The research applies the mixed system method, which includes entropy method and average score method, to analyze the growth stage and major impact indexes targeting 327 survey samples. The empirical results show that the proposed conceptual framework and policy evaluation method could effectively determine the growth position and directions of the construction industrialization. For verification purpose, the study uses the local industry data from Shaanxi Province, China. The calculation results substantiate that the construction industry is in the middle section of the third growth phase. The comparison of the results from statistical methods shows that the local construction industry still needs substantial effort in policy management to improve its sustainable industrialization level. As countermeasures, the policy priorities should concentrate on: (1 enhancing effective cooperation among universities, research institutions and enterprises; (2 improving actions towards technology transfer into productivity; and (3 encouraging market acceptance of construction industrialization. This research complements the existing literature of policy evaluation of construction industrialization. Moreover, it provides theoretical and operational steps on industry policy evaluation and growth management framework, with accurate and ample data analysis on firm-level survey. Researchers and policy makers can use this research for further
Directory of Open Access Journals (Sweden)
Abas Nor Haslinda
2017-01-01
Full Text Available The construction industry sector is considered as being risky with frequent and high accident rate. According to Social Security Organization (SOCSO, the construction accidents has arisen from time to time. Construction Industry Development Board (CIDB has developed the Safety and Health Assessment System in Construction (SHASSIC for evaluating the performance of a contractor in construction project by setting out the safety and health management and practices, however the requirement checklist provided is not comprehensive. Therefore, this study aims to develop a software system for facilitating OSH in building construction project, namely OSH requirements management system (OSHREMS, using Adobe Dreamweaver CS5 and Sublime Text as PHP editor. The results from a preliminary study which was conducted through interviews showed that, the respondents were only implementing the basic requirements that comply with legislations, with the absence of appropriate and specific guideline in ensuring occupational safety and health (OSH at the workplace. The tool will be benefits for contractors and other parties to effectively manage the OSH requirements for their projects based on project details.
A Hybrid MCDM Technique for Risk Management in Construction Projects
Directory of Open Access Journals (Sweden)
Kajal Chatterjee
2018-02-01
Full Text Available Multi-stakeholder based construction projects are subject to potential risk factors due to dynamic business environment and stakeholders’ lack of knowledge. When solving project management tasks, it is necessary to quantify the main risk indicators of the projects. Managing these requires suitable risk mitigation strategies to evaluate and analyse their severity. The existence of information asymmetry also causes difficulties with achieving Pareto efficiency. Hence, to ensure balanced satisfaction of all participants, risk evaluation of these projects can be considered as an important part of the multi-criteria decision-making (MCDM process. In real-life problems, evaluation of project risks is often uncertain and even incomplete, and the prevailing methodologies fail to handle such situations. To address the problem, this paper extends the analytical network process (ANP methodology in the D numbers domain to handle three types of ambiguous information’s, viz. complete, uncertain, and incomplete, and assesses the weight of risk criteria. The D numbers based approach overcomes the deficiencies of the exclusiveness hypothesis and completeness constraint of Dempster–Shafer (D–S theory. Here, preference ratings of the decision matrix for each decision-maker are determined using a D numbers extended consistent fuzzy preference relation (D-CFPR. An extended multi-attributive border approximation area comparison (MABAC method in D numbers is then developed to rank and select the best alternative risk response strategy. Finally, an illustrative example from construction sector is presented to check the feasibility of the proposed approach. For checking the reliability of alternative ranking, a comparative analysis is performed with different MCDM approaches in D numbers domain. Based on different criteria weights, a sensitivity analysis of obtained ranking of the hybrid D-ANP-MABAC model is performed to verify the robustness of the proposed
Strategies for effective management of health and safety in confined site construction
Directory of Open Access Journals (Sweden)
John Spillane
2013-12-01
Full Text Available Purpose: The overall aim of this research is to identify and catalogue the numerous managerial strategies for effective management of health and safety on a confined, urban, construction site. Design/Methodology/Approach: This is achieved by utilising individual interviews, focus groups discussion on selected case studies of confined construction sites, coupled with a questionnaire survey. Findings: The top five key strategies include (1 Employ safe system of work plans to mitigate personnel health and safety issues; (2 Inform personnel, before starting on-site, of the potential issues using site inductions; (3 Effective communication among site personnel; (4 Draft and implement an effective design site layout prior to starting on-site; and (5 Use of banksman (traffic co-ordinator to segregate personnel from vehicular traffic. Practical Implication: The construction sector is one of the leading industries in accident causation and with the continued development and regeneration of our urban centres, confined site construction is quickly becoming the norm - an environment which only fuels accident creation within the construction sector. Originality/Value: This research aids on-site management that requires direction and assistance in the identification and implementation of key strategies for the management of health and safety, particularly in confined construction site environments.
Kucukvar, Murat; Egilmez, Gokhan; Tatari, Omer
2014-06-01
Waste management in construction is critical for the sustainable treatment of building-related construction and demolition (C&D) waste materials, and recycling of these wastes has been considered as one of the best strategies in minimization of C&D debris. However, recycling of C&D materials may not always be a feasible strategy for every waste type and therefore recycling and other waste treatment strategies should be supported by robust decision-making models. With the aim of assessing the net carbon, energy, and water footprints of C&D recycling and other waste management alternatives, a comprehensive economic input-output-based hybrid life-cycle assessment model is developed by tracing all of the economy-wide supply-chain impacts of three waste management strategies: recycling, landfilling, and incineration. Analysis results showed that only the recycling of construction materials provided positive environmental footprint savings in terms of carbon, energy, and water footprints. Incineration is a better option as a secondary strategy after recycling for water and energy footprint categories, whereas landfilling is found to be as slightly better strategy when carbon footprint is considered as the main focus of comparison. In terms of construction materials' environmental footprint, nonferrous metals are found to have a significant environmental footprint reduction potential if recycled. © The Author(s) 2014.
An Analysis of Enterprise Risk Management and IT Effectiveness Constructs
Waithe, Errol
2016-01-01
One major problem many organizations are facing is balancing the risk-management practices of the organization with overall information technology (IT) effectiveness. The purpose of this non-experimental quantitative correlational study was to assess the constructs and correlations associated with enterprise risk management and IT effectiveness.…
Construction of a Linux based chemical and biological information system.
Molnár, László; Vágó, István; Fehér, András
2003-01-01
A chemical and biological information system with a Web-based easy-to-use interface and corresponding databases has been developed. The constructed system incorporates all chemical, numerical and textual data related to the chemical compounds, including numerical biological screen results. Users can search the database by traditional textual/numerical and/or substructure or similarity queries through the web interface. To build our chemical database management system, we utilized existing IT components such as ORACLE or Tripos SYBYL for database management and Zope application server for the web interface. We chose Linux as the main platform, however, almost every component can be used under various operating systems.
Sustainability Base Construction Update
Mewhinney, Michael
2012-01-01
Construction of the new Sustainability Base Collaborative support facility, expected to become the highest performing building in the federal government continues at NASA's Ames Research Center, Moffet Field, Calif. The new building is designed to achieve a platinum rating under the leadership in Energy and Environment Design (LEED) new construction standards for environmentally sustainable construction developed by the U. S. Green Building Council, Washington, D. C. When completed by the end of 2011, the $20.6 million building will feature near zero net energy consumption, use 90 percent less potable water than conventionally build buildings of equivalent size, and will result in reduced building maintenance costs.
Tiong Kung Leong; Norhayati Zakuan; Muhamad Zameri Mat Saman; Mohd. Shoki Md. Ariff; Choy Soon Tan
2014-01-01
This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client sat...
An Analysis of Construction Accident Factors Based on Bayesian Network
Yunsheng Zhao; Jinyong Pei
2013-01-01
In this study, we have an analysis of construction accident factors based on bayesian network. Firstly, accidents cases are analyzed to build Fault Tree method, which is available to find all the factors causing the accidents, then qualitatively and quantitatively analyzes the factors with Bayesian network method, finally determines the safety management program to guide the safety operations. The results of this study show that bad condition of geological environment has the largest posterio...
van der Linden, Willem J.; Theunissen, T.J.J.M.; Boekkooi-Timminga, Ellen; Kelderman, Henk
1987-01-01
Four discussions of test construction based on item response theory (IRT) are presented. The first discussion, "Test Design as Model Building in Mathematical Programming" (T.J.J.M. Theunissen), presents test design as a decision process under certainty. A natural way of modeling this process leads to mathematical programming. General models of test construction are discussed, with information about algorithms and heuristics; ideas about the analysis and refinement of test constraints are also...
The study of the risk management model of construction project
International Nuclear Information System (INIS)
Jiang Bo; Feng Yanping; Liu Changbin
2010-01-01
The paper first analyzed the development of the risk management of construction project and the risk management processes, and then briefly introduced the risk management experience of foreign project management. From the project management by objectives point of view, the greatest risk came from the lack of clarity of the objectives in the project management, which led to the project's risk emergence. In the analysis of the principles of the project objectives identification and risk allocation, the paper set up a project management model which insurance companies involved in the whole process of the project management, and simply analyzed the roles of insurance company at last. (authors)
Traffic incident management in construction and maintenance work zones.
2009-01-01
In 2004, the Federal Highway Administration published updated rules governing work zone safety and mobility; all highway construction and maintenance projects using federal-aid highway funds are required to develop transportation management plans (TM...
Directory of Open Access Journals (Sweden)
Thomas Jordan
2013-02-01
Full Text Available Reviewed by Thomas Jordan Our societies face a number of challenging issues that are both important, because of their impact on the wellbeing of people and nature, and complex, because many causal and conditioning factors and diverse stakeholders are involved. We find such issues in many areas, such as climate change, biodiversity, environmental pollution, intractable conflicts, crime, unhealthy lifestyles, drug abuse, mobbing, etc. Arguably, building capacities to skillfully manage complex societal issues should be a central concern for many of us. I believe most readers of this journal share a belief that the field of adult development sits on a treasure of insight that could contribute very significantly to our understanding of how we could build such capacities. However, the number of solid empirical studies using a developmental perspective on meaning-making among people with crucial roles in organizations and initiatives working on issues of great societal significance is still small. I was therefore very satisfied, not to say thrilled, when I stumbled upon Verna DeLauer’s doctoral dissertation The Mental Demands of Marine Ecosystem-Based Management: A Constructive Developmental Lens. DeLauer has, in my view, written a doctoral dissertation
Organizing Construction Practices in Different Cultural Contexts
DEFF Research Database (Denmark)
Thuesen, Christian; Rasmussen, Christian K. S.
2013-01-01
a number of characteristics and challenges related to the cultural context have been identified highlighting a central issue in existing and future construction practices due to the globalization and thereby increasing importance of cultural understanding in project-based organizing. The empirical findings......This paper presents in-depth case studies of construction practices with a specific focus on understanding the emergent and dynamic nature of construction management in different cultural contexts. The cases are based on actual working-experiences by the author as an assistant project manager...... participating in the construction management on site working for three different contractors in different cultural contexts: (1) Construir Futuro S.A. in Quito, Ecuador; (2) Anker Hansen & co. A/S in Copenhagen, Denmark; and (3) E. Pihl & Soen A/S in Stockholm, Sweden. Based on these explorative case studies...
2010-04-01
... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...
Life cycle assessment of construction and demolition waste management.
Butera, Stefania; Christensen, Thomas H; Astrup, Thomas F
2015-10-01
Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed environmental impacts included both non-toxic and toxic impact categories. The scenarios comprised all stages of the end-of-life management of C&DW, until final disposal of all residues. Leaching of inorganic contaminants was included, as was the production of natural aggregates, which was avoided because of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most important contribution for most nontoxic impacts, accounting for 60-95 per cent of these impacts. Capital goods contributed with negligible impacts. Leaching played a critical role for the toxic categories, where landfilling had lower impacts than utilisation because of the lower levels of leachate per ton of C&DW reaching the groundwater over a 100-year perspective. Leaching of oxyanions (As, V and Sb) was critical with respect to leaching. Typical experimental uncertainties in leaching data did not have a pivotal influence on the results; however, accounting for Cr immobilisation in soils as part of the impact assessment was critical for modelling the leaching impacts. Compared with the overall life cycle of building and construction materials, leaching emissions were shown to be potentially significant for toxicity impacts, compared with contributions from production of the same materials, showing that end-of-life impacts and leaching should not be disregarded when assessing environmental impacts from construction products and materials. CO2 uptake in the C
Community Building Maintenance Corp., Chicago, IL.
A demonstration program, administered by a community based building maintenance, management, and construction corporation, was developed to provide technical training for minority adults in construction, building maintenance, and property management in the Chicago area. The program was concerned with seeking solutions to the lack of housing, job…
Murata, K.; Nakajima, K.; Kinoshita, K.; Tezel, Algan; Koskela, Lauri; Tzortzopoulos, Patricia; Katayama, H.
2016-01-01
Along with the progress of globalization, speed and efficiency have become more critical for any industry than ever before. In this sense, the concept and methods of lean management, promoting these performances, have been deployed from manufacturing, its origin industry, to other industries. This paper deals with this management style in the construction industry, called lean construction. In particular, visual management (VM) as one effective tool in this scheme is focused on. A number of V...
Bemelmans, Jeroen; Voordijk, Johannes T.; Vos, B.; Buter, J.I.H.
2012-01-01
The objective of this paper is to shed light on obstacles to, and opportunities for, increasing the effectiveness of construction firms in managing buyer-supplier relationships. More specifically, the focus is on assessing the maturity level of buyer-supplier relationship management by construction
Bemelmans, J.; Voordijk, H.; Vos, G.C.J.M.; Buter, J.
2012-01-01
The objective of this paper is to shed light on obstacles to, and opportunities for, increasing the effectiveness of construction firms in managing buyer-supplier relationships. More specifically, the focus is on assessing the maturity level of buyer-supplier relationship management by construction
Directory of Open Access Journals (Sweden)
Kadhim Raheem Erzaij
2016-06-01
Full Text Available Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM as analytical hierarchy process (AHP have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.
Walking the tightrope: Constructing gender and professional identities in account management
Gremmen, C.C.M.; Benschop, Y.W.M.
2009-01-01
This paper contributes to the growing stream of organization research that explores the relationship between professional identities and gender. Our central question pertains to how account managers ‘do gender’ in constructing their professional identities. While account management has been
Management of construction waste: a case study in the municipality of Macaé, RJ
Directory of Open Access Journals (Sweden)
Caroline Ramos Medeiros
2016-12-01
Full Text Available The building industry has occupied a prominent place in the Brazilian economy. However it may represent serious environmental impacts in the generation and improper disposal of waste from construction and demolition (C&D. The research aimed at evaluating the initiatives of public management of C&D in the county of Macaé, RJ. It was based on the empirical-phenomenological methods, with individual descriptions and causal connections obtained from stakeholders, literature and documentary reviews, as well as qualified interviews (key informants with local managers and specialists. Preliminary results have allowed for an assessment of the current situation of management, legal instruments, environmental licensing, and irregular disposal of C&D.
Analysis of nuclear-power construction costs
International Nuclear Information System (INIS)
Jansma, G.L.; Borcherding, J.D.
1988-01-01
This paper discusses the use of regression analysis for estimating construction costs. The estimate is based on an historical data base and quantification of key factors considered external to project management. This technique is not intended as a replacement for detailed cost estimates but can provide information useful to the cost-estimating process and to top management interested in evaluating project management. The focus of this paper is the nuclear-power construction industry but the technique is applicable beyond this example. The approach and critical assumptions are also useful in a public-policy situation where utility commissions are evaluating construction in prudence reviews and making comparisons to other nuclear projects. 13 references, 2 figures
Institute of Scientific and Technical Information of China (English)
HU Zhenzhong; ZHANG Jianping; DENG Ziyin
2008-01-01
Time-dependent structure analysis theory has been proved to be more accurate and reliable com-pared to commonly used methods during construction. However, so far applications are limited to partial pe-riod and part of the structure because of immeasurable artificial intervention. Based on the building informa-tion model (BIM) and four-dimensional (4D) technology, this paper proposes an improves structure analysis method, which can generate structural geometry, resistance model, and loading conditions automatically by a close interlink of the schedule information, architectural model, and material properties. The method was applied to a safety analysis during a continuous and dynamic simulation of the entire construction process.The results show that the organic combination of the BIM, 4D technology, construction simulation, and safety analysis of time-dependent structures is feasible and practical. This research also lays a foundation for further researches on building lifecycle management by combining architectural design, structure analy-sis, and construction management.
A Model of Solid Waste Management Based Multilateral Co-Operation in Semi-Urban Community
Kanchanabhandhu, Chanchai; Woraphong, Seree
2016-01-01
The purpose of this research was to construct a model of solid waste management based on multilateral cooperation in semi-urban community. Its specific objectives were to 1) study the solid waste situation and involvement of community in the solid waste management in Wangtaku Sub-district, Muang District, Nakhon Pathom Province; 2) construct a…
Bayesian-network-based safety risk analysis in construction projects
International Nuclear Information System (INIS)
Zhang, Limao; Wu, Xianguo; Skibniewski, Miroslaw J.; Zhong, Jingbing; Lu, Yujie
2014-01-01
This paper presents a systemic decision support approach for safety risk analysis under uncertainty in tunnel construction. Fuzzy Bayesian Networks (FBN) is used to investigate causal relationships between tunnel-induced damage and its influential variables based upon the risk/hazard mechanism analysis. Aiming to overcome limitations on the current probability estimation, an expert confidence indicator is proposed to ensure the reliability of the surveyed data for fuzzy probability assessment of basic risk factors. A detailed fuzzy-based inference procedure is developed, which has a capacity of implementing deductive reasoning, sensitivity analysis and abductive reasoning. The “3σ criterion” is adopted to calculate the characteristic values of a triangular fuzzy number in the probability fuzzification process, and the α-weighted valuation method is adopted for defuzzification. The construction safety analysis progress is extended to the entire life cycle of risk-prone events, including the pre-accident, during-construction continuous and post-accident control. A typical hazard concerning the tunnel leakage in the construction of Wuhan Yangtze Metro Tunnel in China is presented as a case study, in order to verify the applicability of the proposed approach. The results demonstrate the feasibility of the proposed approach and its application potential. A comparison of advantages and disadvantages between FBN and fuzzy fault tree analysis (FFTA) as risk analysis tools is also conducted. The proposed approach can be used to provide guidelines for safety analysis and management in construction projects, and thus increase the likelihood of a successful project in a complex environment. - Highlights: • A systemic Bayesian network based approach for safety risk analysis is developed. • An expert confidence indicator for probability fuzzification is proposed. • Safety risk analysis progress is extended to entire life cycle of risk-prone events. • A typical
MANAGEMENT PROCESS OF HEALTH AND SAFETY RISK IN THE NIGERIA CONSTRUCTION INDUSTRY
Akwu, Ifeoma Claris
2017-01-01
The study examined the state of health and safety risk management practices in the building sector of the construction industry with the objective to examine the health and safety risk management processes adopted by the construction industry in Nigeria; the study adopted the survey and case study research design. It employed the use of Delphi’s technique in the distribution of questionnaire and made use of chi-square analytical technique for the analysis of gathered data. The findings reveal...
Critical Quality Source Diagnosis for Dam Concrete Construction Based on Quality Gain-loss Function
Directory of Open Access Journals (Sweden)
Bo Wang
2014-06-01
Full Text Available In dam concrete construction process, it not only has quality loss arising from quality fluctuation, but also gains quality compensation effect due to the mutual cooperation and adaptation coupling between working procedures (WPs. The calculation and transmission complexity of the quality loss and quality compensation affect the quality management of dam concrete construction. As the quality compensation effect existing in the production practice cannot be described by Taguchi quality loss function, the concept of quality gain-loss function was presented in this paper, which was based on endowing the constant term in the expansion of Taylor series with physical meaning—quality compensation. Based on quality gain-loss function theory, a new quality gain-loss transmission model of dam concrete construction based on GERT network was constructed and its effective algorithm was designed. WP quality gain-loss and its impact on the final product were reasonably measured, and the critical quality routes and critical quality WPs were detected and diagnosed in dam concrete construction network. Summer temperature-controlled concrete construction in the third phase of Three Gorges Project (TGP was taken as an example to carry out the study, and the calculation results showed the validity and practicability of the presented model and algorithm.
Directory of Open Access Journals (Sweden)
Ivanchura Vladimir Ivanovich
2018-02-01
Full Text Available Subject: management of operating modes of road-building machines, taking into account the implementation of the concept of information modeling of the road. We have reviewed the status and the development problems for directions of improving the control systems of road-construction machine processes. In this work we focus on the road construction stage “laying asphalt-concrete - compaction”, the effective control of which can lead to significant improvement in the quality of road surfaces, increase of durability and reduction of defects in pavements. Research objectives: rationale and directions of realization of the concept of intellectualization of the road construction management. Materials and methods: analysis of the shortcomings of construction of asphalt-concrete pavements, analysis of the methods of workflow management of road-building machines. Results: we have substantiated the methodological background for the development of intellectual control systems of road-building machines. Conclusions: we considered possible ways of introducing the concept of intellectualization of management systems for road-building machines.
Hossain, Md Uzzal; Wu, Zezhou; Poon, Chi Sun
2017-11-01
This study aimed to compare the environmental performance of building construction waste management (CWM) systems in Hong Kong. Life cycle assessment (LCA) approach was applied to evaluate the performance of CWM systems holistically based on primary data collected from two real building construction sites and secondary data obtained from the literature. Different waste recovery rates were applied based on compositions and material flow to assess the influence on the environmental performance of CWM systems. The system boundary includes all stages of the life cycle of building construction waste (including transportation, sorting, public fill or landfill disposal, recovery and reuse, and transformation and valorization into secondary products). A substitutional LCA approach was applied for capturing the environmental gains due to the utilizations of recovered materials. The results showed that the CWM system by using off-site sorting and direct landfilling resulted in significant environmental impacts. However, a considerable net environmental benefit was observed through an on-site sorting system. For example, about 18-30kg CO 2 eq. greenhouse gases (GHGs) emission were induced for managing 1 t of construction waste through off-site sorting and direct landfilling, whereas significant GHGs emission could be potentially avoided (considered as a credit -126 to -182kg CO 2 eq.) for an on-site sorting system due to the higher recycling potential. Although the environmental benefits mainly depend on the waste compositions and their sortability, the analysis conducted in this study can serve as guidelines to design an effective and resource-efficient building CWM system. Copyright © 2017 Elsevier Ltd. All rights reserved.
Criticality in Location-Based Management of Construction
DEFF Research Database (Denmark)
Büchmann-Slorup, Rolf
, the current literature does not include a collected description of what constitute critical activities in LBM. Nor have the implications for scheduling and control efforts of these changes in criticality been described. Accordingly, the present thesis establishes a collected criticality principle of LBM......; highlights the implications of this alternative criticality principle to the schedule and control effort on construction projects; and suggests how time buffers should be applied on LBM projects to protect critical activities, compress project’s lead times, optimize flow, and minimize resource consumption....... The thesis offers three main results that contribute to the current LBM literature and close some of the gaps therein. The thesis conceptualizes the criticality principle of LBM by analyzing the relationship between inherent constraints in LBM and the lead times of projects. The collected criticality...
The peculiarities of process-based approach realization in transport sector company management
Khripko, Elena; Sidorov, Gennadiy
2017-10-01
In the present article we study the phenomena of multiple meaning in understanding process-based management method in construction of transport infrastructure facilities. The idea of multiple meaning is in distortions which appear during reception of the management process paradigm in organizational environment of transport sector. The cause of distortion in process management is organizational resistance. The distortions of management processes are discovered at the level of diffusion among spheres of responsibility, collision in forms of functional, project and process interaction between the owner of the process and its participants. The level of distortion is affected by the attitude towards the result of work which means that process understanding of the result is replaced by the functional one in practice of management. This transfiguration is the consequence of regressive defensive mechanisms of the organizational environment. On the base of experience of forming process management in construction of transport infrastructure facilities company of the issues of diagnostics of various forms of organizational resistance and ways of reducing the destructive influence on managing processes are reviewed.
Directory of Open Access Journals (Sweden)
Moon Gyu Kim
2016-01-01
Full Text Available Green supply chain management (GSCM enhances a firm’s competitiveness for sustainable growth. GSCM is especially important in the construction industry, a project-based business that often results in heavy environmental pollution. For the successful implementation of GSCM in the construction industry to occur, contractors should make the best use of suppliers’ environmental capabilities based on shared understanding of the capabilities. This paper examines the shared understanding of suppliers’ environmental management capabilities between the contractor and suppliers by assessing the consistency between the contractor’s and suppliers’ evaluations of the capabilities. This explorative case study investigates a supply chain comprised of a major construction firm and 106 suppliers in Korea. The results of the case analysis show that the suppliers’ self-evaluation scores of environmental capability are higher than the contractor’s evaluation scores. Furthermore, from both evaluators, suppliers received the lowest scores in the evaluation item rating the relationship with second-tier suppliers and the highest in the evaluation item rating the relationship with the contractor. The consistency between the suppliers’ and contractor’s evaluation is related to several characteristics of suppliers, such as industry type, firm size and partnership duration with the contractor. This study contributes to the literature of GSCM and strategic alignment amongst supply chain partners for the construction industry.
Information management system for design, construction and operation of nuclear power plants
International Nuclear Information System (INIS)
Bolch, M.C.; Jones, C.R.
1990-01-01
This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software
Information management system for design, construction and operation of nuclear power plants
Energy Technology Data Exchange (ETDEWEB)
Bolch, M.C. (Duke Power Co. (US)); Jones, C.R. (S. Levy Inc. (US))
1990-01-01
This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software.
Adeleke, A. Q.; Bahaudin, A. Y.; Kamaruddeen, A. M.
2016-08-01
Certain organizational internal and external factors have been found to influence effective construction risk management within the construction company which has contributed to massive risk occurrence on the projects. Yet, the influence of the organizational factors such as effective communication, team competency with skills, active leadership, political factor, organizational culture, technology factor and economic factor on effective construction risk management among the construction companies operating in Abuja and Lagos state Nigeria have not received considerable attention. More so, a moderating variable is proposed. This paper proposes rules and regulations as the potential moderator on the relationship between organisational internal factors, external factors and effective construction risk management.
2010-10-01
...-Office of Construction and Facilities Management and National Cemetery Administration. 801.602-80 Section... Responsibilities 801.602-80 Legal and technical review-Office of Construction and Facilities Management and National Cemetery Administration. An Office of Construction and Facilities Management or National Cemetery...
Failure stress as a motivator for creative construction management
Gassel, van F.J.M.; Visser, M.J.E.; Bronswijk, van J.E.M.H.; Haidu, M.; Skibniewski, M.
2013-01-01
A building assignment is a complex task that demands collaborative working in order to achieve added value for users and society through creative construction management. Modular building systems are used in workshops in the building environment domain to make students aware of various phenomena
A Spanish model for quantification and management of construction waste.
Solís-Guzmán, Jaime; Marrero, Madelyn; Montes-Delgado, Maria Victoria; Ramírez-de-Arellano, Antonio
2009-09-01
Currently, construction and demolition waste (C&D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C&D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C&D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C&D waste volume in both new construction and demolition projects.
A Spanish model for quantification and management of construction waste
International Nuclear Information System (INIS)
Solis-Guzman, Jaime; Marrero, Madelyn; Montes-Delgado, Maria Victoria; Ramirez-de-Arellano, Antonio
2009-01-01
Currently, construction and demolition waste (C and D waste) is a worldwide issue that concerns not only governments but also the building actors involved in construction activity. In Spain, a new national decree has been regulating the production and management of C and D waste since February 2008. The present work describes the waste management model that has inspired this decree: the Alcores model implemented with good results in Los Alcores Community (Seville, Spain). A detailed model is also provided to estimate the volume of waste that is expected to be generated on the building site. The quantification of C and D waste volume, from the project stage, is essential for the building actors to properly plan and control its disposal. This quantification model has been developed by studying 100 dwelling projects, especially their bill of quantities, and defining three coefficients to estimate the demolished volume (CT), the wreckage volume (CR) and the packaging volume (CE). Finally, two case studies are included to illustrate the usefulness of the model to estimate C and D waste volume in both new construction and demolition projects.
International Nuclear Information System (INIS)
Utomo
2011-01-01
Management and development of a nuclear installation could not be separated from the role of Construction Management in the planning stages of the project start until the commissioning. On the construction of nuclear installations MPR 30 Serpong, the role of human resource of Indonesia particularly Batan has received a lot of knowledge and experiences in the development process, the ongoing process of transfer of technology from the foreign consultants (Bechtel-USA) to Batan has been conducted at the time, and at least we are able to absorb knowledge and prove it through to completion development including commissioning activities. In the course of the time human resource challenges are required to have individual skills and expertise sufficient to handle a mega project such as nuclear power plants. Construction Management is managing a major project stages from planning, construction, procurement, installation commissioning until hand over to the owner. Based on the experience of the construction of the RSG-LP, it is expected that human resources that meet to the standards required competencies for the preparation of NPP in Indonesia are fulfilled. (author)
Management of health in the construction and assembly of land pipelines
Energy Technology Data Exchange (ETDEWEB)
Richa, Newton M.M.; Ruella, Nildemar C [PETROBRAS, Rio de Janeiro, RJ (Brazil)
2009-07-01
The objectives of this study are: describe the main aspects of a health management experience in a work of construction and assembly of land pipeline, highlighting the positive impacts on safety and productivity; demonstrate that the general objective of the health function is to provide technical support to companies, information and services for leaders, managers, supervisors, workers and families in the management of multiple interfaces of health, especially the health-work interface; and demonstrate that the appropriate management of health may contribute significantly to the overall management of undertakings. (author)
Jieh Haur, Chen; Kuo, Lin Sheng; Fu, Chen Ping; Li Hsu, Yeh; Da Heng, Chen
2018-01-01
Construction surplus soil tracking management has been the key management issue in Taiwan since 1991. This is mainly due to the construction surplus soils were often regarded as disposable waste and were disposed openly without any supervision, leading to environmental pollution. Even though the surplus soils were gradually being viewed as reusable resources, some unscrupulous enterprises still dump them freely for their own convenience. In order to dispose these surplus soils, site offices are required to confirm with the soil treatment plant regarding the approximate soil volume for hauling vehicle dispatch. However, the excavated soil volume will transform from bank volume to loose volume upon excavation, which may differ by a certain speculative coefficient (1.3), depending on the excavation site and geological condition. For managing and tracking the construction surplus soils, local government authorities frequently performed on-site spot check, but the lack of rapid assessment tools for soil volume estimation increased the evaluation difficulty for on-site inspectors. This study adopted unmanned aerial vehicle (UAV) in construction surplus soil tracking and rapidly acquired site photography and point cloud data, the excavated soil volume can be determined promptly after post-processing and interpretation, providing references to future surplus soil tracking management.
Faucette, L B; Scholl, B; Beighley, R E; Governo, J
2009-01-01
The National Pollutant Discharge Elimination System (NPDES) Phase II requires construction activities to have erosion and sediment control best management practices (BMPs) designed and installed for site storm water management. Although BMPs are specified on storm water pollution prevention plans (SWPPPs) as part of the construction general permit (GP), there is little evidence in the research literature as to how BMPs perform or should be designed. The objectives of this study were to: (i) comparatively evaluate the performance of common construction activity erosion control BMPs under a standardized test method, (ii) evaluate the performance of compost erosion control blanket thickness, (iii) evaluate the performance of compost erosion control blankets (CECBs) on a variety of slope angles, and (iv) determine Universal Soil Loss Equation (USLE) cover management factors (C factors) for these BMPs to assist site designers and engineers. Twenty-three erosion control BMPs were evaluated using American Society of Testing and Materials (ASTM) D-6459, standard test method for determination of ECB performance in protecting hill slopes from rainfall induced erosion, on 4:1 (H:V), 3:1, and 2:1 slopes. Soil loss reduction for treatments exposed to 5 cm of rainfall on a 2:1 slope ranged from-7 to 99%. For rainfall exposure of 10 cm, treatment soil loss reduction ranged from 8 to 99%. The 2.5 and 5 cm CECBs significantly reduced erosion on slopes up to 2:1, while CECBs or= 4:1 when rainfall totals reach 5 cm. Based on the soil loss results, USLE C factors ranged from 0.01 to 0.9. These performance and design criteria should aid site planners and designers in decision-making processes.
Latief, Yusuf; Armyn Machfudiyanto, Rossy; Arifuddin, Rosmariani; Mahendra Fira Setiawan, R.; Yogiswara, Yoko
2017-07-01
Safety Culture in the construction industry is very influential on the socio economic conditions that resulted in the country’s competitiveness. Based on the data, the accident rate of construction projects in Indonesia is very high. In the era of the Asian Economic Community (AEC) Indonesian contractor is required to improve competitiveness, one of which is the implementation of the project without zero accident. Research using primary and secondary data validated the results of the literature experts and questionnaire respondents were analyzed using methods SmartPLS, obtained pattern of relationships between dimensions of safety culture to improve the performance of Safety. The results showed that the behaviors and Cost of Safety into dimensions that significantly affect the performance of safety. an increase in visible policy-based on Regulation of Public Work and Housing No 5/PRT/M/2014 to improve to lower the accident rate.
Environmental management of construction and demolition waste in Kuwait.
Kartam, Nabil; Al-Mutairi, Nayef; Al-Ghusain, Ibrahim; Al-Humoud, Jasem
2004-01-01
There is an increasing pressure on the construction industry to reduce costs and improve the quality of our environment. The fact is that both of these goals can be achieved at the same time. Although construction and demolition (C&D) constitutes a major source of waste in terms of volume and weight, its management and recycling efforts have not yet seen the light in Kuwait. This study focuses on recycling efforts leading to the minimization of the total C&D waste that is currently landfilled in Kuwait. This paper presents the current status of C&D waste disposal system in Kuwait and identifies the potential problems to the environment, people and economy. Then, it investigates alternative solutions to manage and control this major type of waste in an economically efficient and environmentally safe manner. Next, the paper describes the feasibility of establishing a C&D waste recycling facility in Kuwait. It concludes by highlighting the major benefits and bottleneck problems with such a recycling facility.
Voordijk, Johannes T.; Adriaanse, Adriaan Maria
2016-01-01
The objective is to explore what engaged scholarship (ES) could mean for construction management research in facilitating interactions between practice and theory. ES aims to develop knowledge that advances both science and practice through engagement of scholars with practice. Three types of ES are
Spillane, John P.; Oyedele, Lukumon O.; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E.; Tijani, Iyabo K.
2011-01-01
The construction industry is inherently risky, with a significant number of accidents and disasters occurring, particularly on confined construction sites. This research investigates and identifies the various issues affecting successful management of health and safety in confined construction sites. The rationale is that identifying the issues would assist the management of health and safety particularly in inner city centres which are mostly confined sites. Using empiricism epistemology, th...
Directory of Open Access Journals (Sweden)
J. R. Emirbekova
2017-01-01
Full Text Available Objectives. The development of an algorithm for optimising the formation and use of human resources of a construction enterprise.Methods. The research basis consists in a generalised methodology for personnel management, as well as specific methods for logical and statistical analysis of management decision-making in construction activities. The approaches, criteria, indicators and methods for assessing the effectiveness of human resource management are studied alongside factors influencing the efficiency resource potential management in a construction enterprise.Results. A quantitative methodology for the selection of qualified staff for the implementation of construction projects is proposed. The indicators of the effectiveness of the staff potential are determined. Qualitative and quantitative data for the optimal personnel formation for the construction project realisation are systematised. An algorithm for optimising the personnel potential of a construction enterprise is proposed. The use of this algorithm will inform the choice of organisational and economic solutions for the formation and effective use of qualified personnel at the expense of combining professions, thereby reducing the cost and duration of construction work and increasing the resource efficiency and competitiveness of the construction enterprise.Conclusion. The labour potential of a construction enterprise can significantly contribute to increased efficiency if it is used appropriately and in an organised manner, using modern scientific methods of management. Methods for building and organising the activity of the personnel management system are proposed and a mechanism for establishing relationships between the employer and employees that promote the most effective use of all types of resources for the development of the enterprise according to strategic objectives is disclosed. The dominant role of the
Model Configuration and Innovative Design of College Students’ Ecological Civilization Construction
Chengwen, Yang
2018-02-01
This study is based on Marxist eco-civilization thought, combining with Eco management theory, puts forward solutions for college students’ ecological civilization construction. The paper based on the perspective of ecological management theory to analyze the main elements of eco-civilization construction of college students, mainly including five categories. In view of above-mentioned analyze, constructed the model of college students’ eco-civilization which is based on the theory of eco-management, and put forward on concrete methods to improve it.
Study on Collaborative SCM of Construction Enterprises Based on Information-Sharing
Wang, Lianyue
Economic globalization and the integration process has led to competition among construction enterprises become increasingly fierce, which are adjusting their development strategies and efforts to seek for the knowledge economy and network environment to promote enterprise survival and development, enhancing the competitiveness of enterprises in the new business management models and ideas. This paper first discussed the concept of the supply chain collaboration of the construction enterprise and constituted a information management platform of the general contracting project. At last, the paper puts forward tactics which aims at helping construction enterprises realize supply chain collaboration and enhance the competitiveness of enterprises.
Directory of Open Access Journals (Sweden)
Murat Kucukvar
2016-01-01
Full Text Available The current waste management literature lacks a comprehensive LCA of the recycling of construction materials that considers both process and supply chain-related impacts as a whole. Furthermore, an optimization-based decision support framework has not been also addressed in any work, which provides a quantifiable understanding about the potential savings and implications associated with recycling of construction materials from a life cycle perspective. The aim of this research is to present a multi-criteria optimization model, which is developed to propose economically-sound and environmentally-benign construction waste management strategies for a LEED-certified university building. First, an economic input-output-based hybrid life cycle assessment model is built to quantify the total environmental impacts of various waste management options: recycling, conventional landfilling and incineration. After quantifying the net environmental pressures associated with these waste treatment alternatives, a compromise programming model is utilized to determine the optimal recycling strategy considering environmental and economic impacts, simultaneously. The analysis results show that recycling of ferrous and non-ferrous metals significantly contributed to reductions in the total carbon footprint of waste management. On the other hand, recycling of asphalt and concrete increased the overall carbon footprint due to high fuel consumption and emissions during the crushing process. Based on the multi-criteria optimization results, 100% recycling of ferrous and non-ferrous metals, cardboard, plastic and glass is suggested to maximize the environmental and economic savings, simultaneously. We believe that the results of this research will facilitate better decision making in treating construction and debris waste for LEED-certified green buildings by combining the results of environmental LCA with multi-objective optimization modeling.
Yoon, Seok J; Lin, Hsing K; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua
2013-12-01
The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became widely available, were analyzed to understand the effect of OHSMS on the work-related injury rates in the construction industry. The Korea Occupational Safety and Health Agency 18001 is the certification to these companies performing OHSMS in South Korea. The questionnaire was created to analyze the differences of OHSMS awareness between site general managers and OHS managers of construction companies. The implementation of OHSMS among the top 100 construction companies in South Korea shows that the accident rate decreased by 67% and the fatal accident rate decreased by 10.3% during the period from 2006 to 2011. The survey in this study shows different OHSMS awareness levels between site general managers and OHS managers. The differences were motivation for developing OHSMS, external support needed for implementing OHSMS, problems and effectiveness of implementing OHSMS. Both work-related accident and fatal accident rates were found to be significantly reduced by implementing OHSMS in this study. The differences of OHSMS awareness between site general managers and OHS managers were identified through a survey. The effect of these differences on safety and other benefits warrants further research with proper data collection.
Gurmu, Argaw Tarekegn; Aibinu, Ajibade Ayodeji; Chan, Toong Khuan
2016-01-01
This research investigates management practices that have the potential to enhance productivity in building projects by focusing on construction methods. In phase 1 of the study, face-to-face interviews with nineteen experts were conducted to identify the best management practices for construction methods. The qualitative data analysis reached saturation and resulted in a list of best practices for construction methods that are relevant to the local industry. The second phase used an industry...
The use of production management techniques in the construction of large scale physics detectors
Bazan, A; Estrella, F; Kovács, Z; Le Flour, T; Le Goff, J M; Lieunard, S; McClatchey, R; Murray, S; Varga, L Z; Vialle, J P; Zsenei, M
1999-01-01
The construction process of detectors for the Large Hadron Collider (LHC) experiments is large scale, heavily constrained by resource availability and evolves with time. As a consequence, changes in detector component design need to be tracked and quickly reflected in the construction process. With similar problems in industry engineers employ so-called Product Data Management (PDM) systems to control access to documented versions of designs and managers employ so- called Workflow Management software (WfMS) to coordinate production work processes. However, PDM and WfMS software are not generally integrated in industry. The scale of LHC experiments, like CMS, demands that industrial production techniques be applied in detector construction. This paper outlines the major functions and applications of the CRISTAL system (Cooperating Repositories and an information System for Tracking Assembly Lifecycles) in use in CMS which successfully integrates PDM and WfMS techniques in managing large scale physics detector ...
THE BASES OF THE MANAGEMENT OF SOCIAL PROJECTS OF BUSINESS
Directory of Open Access Journals (Sweden)
O. B. Zilberstein
2015-01-01
Full Text Available In article on wide material the author opens basic approaches to formation of the theoretical base of management of social projects of business.The purpose of work is generalization of theoretical bases of project management of business which have social character. The logic of a statement of material is under construction as follows. In water part of article authors do the assumption that at the heart of an object of research three basic elements are put: project management, social management and management of social projects. Proceeding from this assumption in work further reasonings are under construction. The main part of article contains three subsections. In the fi rst subsection of article defi nition of the concept «project management» is formulated and methodological approaches to project management (PRINCE2, PERT, the Model Agile, Lean Management, BRM are generalized. In the second subsection the author's understanding of entity of social management is presented and the main techniques of social management are considered, and also the characteristic of methodology of management of social projects is given. In the third subsection the author's concept of entity of management of social projects of business is formulated. In fi nal part of article authors draw a conclusion about the importance of management of social projects of business. This article, fi rst of all, has theoretical and methodological value for formation of eff ective methods and instruments of management of social projects of business, and also for development of the theory and practice of corporate social responsibility.
Yoon, Seok J.; Lin, Hsing K.; Chen, Gang; Yi, Shinjea; Choi, Jeawook; Rui, Zhenhua
2013-01-01
Background: The study was conducted to investigate the current status of the occupational health and safety management system (OHSMS) in the construction industry and the effect of OHSMS on accident rates. Differences of awareness levels on safety issues among site general managers and occupational health and safety (OHS) managers are identified through surveys. Methods: The accident rates for the OHSMS-certified construction companies from 2006 to 2011, when the construction OHSMS became ...
International Nuclear Information System (INIS)
Syahirah Abdul Rahman; Phongsakorn Prak Tom; Wan Abd Hadi Wan Abu Bakar; Shaharum Ramli
2010-01-01
This study discusses the techniques of project management for the construction of nuclear power plants that can be used in Malaysia. Nuclear power reactors are expected to apply is the categories of Gen III + reactor where it is safer and more modern than the first generation of reactors built in the 1970s. The objective of this study is that the construction of this reactor to be completed by the stipulated time and not exceed the cost estimates. In addition, project management is also able to meet all the specifications and achieve the quality standard. In this study, the techniques used in project management to ensure the success of construction projects of nuclear power plants are a Gantt Chart, CPM/ PERT and Microsoft Project. From the study, found that these techniques can assist in facilitating the management of the project for the construction of nuclear power plants to ensure that the estimated time and cost can be managed more effectively as well as quality of care. (author)
Managing risks during the construction of a power generation facility
International Nuclear Information System (INIS)
Loulakis, M.C.
1992-01-01
The construction of a power generation facility is a substantial undertaking that involves considerable risks to all parties involved. While contractors are accustomed to dealing with risks, construction owners are typically more naive about not only the risks they are assuming in the construction of a project, but also about the role they play on the project itself. Owners and developers of power facilities must understand at the outset that their role during the construction of a project is as integral to the success of the project as that of the designer and contractor. In addition, owners should also understand that there are virtually no risks on a construction project that cannot be shifted among the contracting parties as part of the business deal. Consequently, an owner may contractually be assuming the risks of (1) unusually severe weather, (2) unexpected subsurface conditions, (3) strikes at the turbine supplier's plant or (4) changes in law - as well as the increases in price and delays to project completion associated with such risks. In light of this, a prudent owner will evaluate more than just whether there is sufficient financing to complete the construction of a contemplated project. Prudent owners will conduct a risk management review of the project structure and the contracting terms, with the primary focus being (1) the identification and analysis of the most significant risks faced, (2) a determination of how such risks can be either mitigated or eliminated, and (3) the assessment of the financial exposure to the owner should the potential risk become a reality. This paper will present the framework that owners and developers of power generation projects can use in undertaking such a risk management review
Study on the construction and operation for management system of municipal domestic wastes
Institute of Scientific and Technical Information of China (English)
Liu Wei; Wang Shuqiang; Chen Jingxin
2006-01-01
In recent years, the quantity of our country's municipal domestic wastes increase rapidly, but the waste disposal still has problems, such as the simple way of processing, wasting the resources, the serious environmental pollution and so on. By holding waste minimization as the center, the developed countries have formed perfect waste management system. Based on analyzing the status quo and problems of processing in our country, on the principle of benefit, scale,waste minimization, reclamation and hazard-free treatment, according to the recycling model of processing, the article has constructed our country's domestic wastes management system, proposed the measures of promoting the operation of system. It has realized the transformation of waste management system from terminal disposal to source reduction,achieved the goals, including domestic wastes categorizing and reclaiming, industrialization and non-pollution processing,and finally brought sustainable development for resources, environment, economy and society.
Life cycle assessment of construction and demolition waste management
International Nuclear Information System (INIS)
Butera, Stefania; Christensen, Thomas H.; Astrup, Thomas F.
2015-01-01
Highlights: • LCA of C&DW utilisation in road vs. C&DW landfilling. • C&DW utilisation in road better than landfilling for most categories. • Transportation is the most important process in non-toxic impact categories. • Leaching of oxyanions is the critical process in toxic impact categories. • Modelling of Cr fate in the subsoil is highly influential to the results. - Abstract: Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed environmental impacts included both non-toxic and toxic impact categories. The scenarios comprised all stages of the end-of-life management of C&DW, until final disposal of all residues. Leaching of inorganic contaminants was included, as was the production of natural aggregates, which was avoided because of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most important contribution for most nontoxic impacts, accounting for 60–95 per cent of these impacts. Capital goods contributed with negligible impacts. Leaching played a critical role for the toxic categories, where landfilling had lower impacts than utilisation because of the lower levels of leachate per ton of C&DW reaching the groundwater over a 100-year perspective. Leaching of oxyanions (As, V and Sb) was critical with respect to leaching. Typical experimental uncertainties in leaching data did not have a pivotal influence on the results; however, accounting for Cr immobilisation in soils as part of the impact assessment was critical for modelling the leaching impacts. Compared
Life cycle assessment of construction and demolition waste management
Energy Technology Data Exchange (ETDEWEB)
Butera, Stefania, E-mail: stbu@teknologisk.dk; Christensen, Thomas H.; Astrup, Thomas F.
2015-10-15
Highlights: • LCA of C&DW utilisation in road vs. C&DW landfilling. • C&DW utilisation in road better than landfilling for most categories. • Transportation is the most important process in non-toxic impact categories. • Leaching of oxyanions is the critical process in toxic impact categories. • Modelling of Cr fate in the subsoil is highly influential to the results. - Abstract: Life cycle assessment (LCA) modelling of construction and demolition waste (C&DW) management was carried out. The functional unit was management of 1 Mg mineral, source separated C&DW, which is either utilised in road construction as a substitute for natural aggregates, or landfilled. The assessed environmental impacts included both non-toxic and toxic impact categories. The scenarios comprised all stages of the end-of-life management of C&DW, until final disposal of all residues. Leaching of inorganic contaminants was included, as was the production of natural aggregates, which was avoided because of the use of C&DW. Typical uncertainties related to contaminant leaching were addressed. For most impact categories, utilisation of C&DW in road construction was preferable to landfilling; however, for most categories, utilisation resulted in net environmental burdens. Transportation represented the most important contribution for most nontoxic impacts, accounting for 60–95 per cent of these impacts. Capital goods contributed with negligible impacts. Leaching played a critical role for the toxic categories, where landfilling had lower impacts than utilisation because of the lower levels of leachate per ton of C&DW reaching the groundwater over a 100-year perspective. Leaching of oxyanions (As, V and Sb) was critical with respect to leaching. Typical experimental uncertainties in leaching data did not have a pivotal influence on the results; however, accounting for Cr immobilisation in soils as part of the impact assessment was critical for modelling the leaching impacts. Compared
A Study on the Approach to Quality Management in Construction of Nuclear Power Plants
Energy Technology Data Exchange (ETDEWEB)
Pingish, Panupong [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of); Choi, Kwang Sik [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)
2010-05-15
The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system
A Study on the Approach to Quality Management in Construction of Nuclear Power Plants
International Nuclear Information System (INIS)
Pingish, Panupong; Choi, Kwang Sik
2010-01-01
The quality of works and services in nuclear facilities are important aspect of public safety and environmental protection. In the general legal framework for the regulation of nuclear power plants of each country, the requirement which effectiveness, overall quality management programme be established should be present. The organization having overall responsibility for a nuclear power plant shall be responsible for the establishment and implementation of the overall quality management programme for that plant. The construction methods available for new nuclear power plants are generally the same as those used for other big construction projects. The construction stage of a nuclear power plant includes a multitude of activities affecting quality which are performed by various organizations with specific responsibilities assigned to them. At the present, the IAEA source materials have been changing some documents for supporting tendency in the nuclear technology likewise in term of quality assurance concept to quality management concept. The principle goal for quality management is achieved assurance and sustainable with nuclear safety. This system brings all the requirements for managing facilities and activities together by only one system
a Quadtree Organization Construction and Scheduling Method for Urban 3d Model Based on Weight
Yao, C.; Peng, G.; Song, Y.; Duan, M.
2017-09-01
The increasement of Urban 3D model precision and data quantity puts forward higher requirements for real-time rendering of digital city model. Improving the organization, management and scheduling of 3D model data in 3D digital city can improve the rendering effect and efficiency. This paper takes the complexity of urban models into account, proposes a Quadtree construction and scheduling rendering method for Urban 3D model based on weight. Divide Urban 3D model into different rendering weights according to certain rules, perform Quadtree construction and schedule rendering according to different rendering weights. Also proposed an algorithm for extracting bounding box extraction based on model drawing primitives to generate LOD model automatically. Using the algorithm proposed in this paper, developed a 3D urban planning&management software, the practice has showed the algorithm is efficient and feasible, the render frame rate of big scene and small scene are both stable at around 25 frames.
A QUADTREE ORGANIZATION CONSTRUCTION AND SCHEDULING METHOD FOR URBAN 3D MODEL BASED ON WEIGHT
Directory of Open Access Journals (Sweden)
C. Yao
2017-09-01
Full Text Available The increasement of Urban 3D model precision and data quantity puts forward higher requirements for real-time rendering of digital city model. Improving the organization, management and scheduling of 3D model data in 3D digital city can improve the rendering effect and efficiency. This paper takes the complexity of urban models into account, proposes a Quadtree construction and scheduling rendering method for Urban 3D model based on weight. Divide Urban 3D model into different rendering weights according to certain rules, perform Quadtree construction and schedule rendering according to different rendering weights. Also proposed an algorithm for extracting bounding box extraction based on model drawing primitives to generate LOD model automatically. Using the algorithm proposed in this paper, developed a 3D urban planning&management software, the practice has showed the algorithm is efficient and feasible, the render frame rate of big scene and small scene are both stable at around 25 frames.
The Role of Problem Solving in Construction Management Practices
DEFF Research Database (Denmark)
Schultz, Casper Siebken
2012-01-01
industry. An Industrial PhD carried out at a large Danish contractor examined how failures and defects are produced and handled in the social practices of construction projects. The study addresses quality issues related to project management and examines the role of problem solving practices......Quality issues are a topic of continuous interest in the Danish construction industry. Not only can failures and defects be vital to the success of the single project but also the annual profits of the whole company can be put at risk. Moreover quality issues jeopardize the reputation of the entire......-dispositions regarding quality issues in the decision making and redressing of defects and failures in the processes. The role of problem solving and trouble-shooting is analysed through the well-organized processes of erecting the precast concrete structure and the chaotic processes of constructing the penthouse storey...
Spillane, John P; Oyedele, Lukumon O; Von Meding, Jason; Konanahalli, Ashwini; Jaiyeoba, Babatunde E; Tijani, Iyabo K
2011-01-01
The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues...
Sustainable construction building performance simulation and asset and maintenance management
2016-01-01
This book presents a collection of recent research works that highlight best practice solutions, case studies and practical advice on the implementation of sustainable construction techniques. It includes a set of new developments in the field of building performance simulation, building sustainability assessment, sustainable management, asset and maintenance management and service-life prediction. Accordingly, the book will appeal to a broad readership of professionals, scientists, students, practitioners, lecturers and other interested parties.
Upnp-Based Discovery And Management Of Hypervisors And Virtual Machines
Directory of Open Access Journals (Sweden)
Sławomir Zieliński
2011-01-01
Full Text Available The paper introduces a Universal Plug and Play based discovery and management toolkitthat facilitates collaboration between cloud infrastructure providers and users. The presentedtools construct a unified hierarchy of devices and their management-related services, thatrepresents the current deployment of users’ (virtual infrastructures in the provider’s (physicalinfrastructure as well as the management interfaces of respective devices. The hierarchycan be used to enhance the capabilities of the provider’s infrastructure management system.To maintain user independence, the set of management operations exposed by a particulardevice is always defined by the device owner (either the provider or user.
Mendis, Daylath; Hewage, Kasun N; Wrzesniewski, Joanna
2013-10-01
The Canadian construction industry generates 30% of the total municipal solid waste deposited in landfills. Ample evidence can be found in the published literature about rework and waste generation due to ambiguity and errors in contract documents. Also, the literature quotes that disclaimer clauses in contract documents are included in the contractual agreements to prevent contractor claims, which often cause rework. Our professional practice has also noted that there are several disclaimer clauses in standard contract documents which have the potential to cause rework (and associated waste). This article illustrates a comparative study of standard contractual documents and their potential to create rework (and associated waste) in different regions of the world. The objectives of this study are (1) to analyse standard contractual documents in Canada, the USA and Australia in terms of their potential to generate rework and waste, and (2) to propose changes/amendments to the existing standard contract documents to minimise/avoid rework. In terms of construction waste management, all the reviewed standard contract documents have deficiencies. The parties that produce the contract documents include exculpatory clauses to avoid the other party's claims. This approach tends to result in rework and construction waste. The contractual agreements/contract documents should be free from errors, deficiencies, ambiguity and unfair risk transfers to minimise/avoid potential to generate rework and waste.
Trend of the research on construction and demolition waste management
International Nuclear Information System (INIS)
Yuan Hongping; Shen Liyin
2011-01-01
Research interests in addressing construction and demolition (C and D) waste management issues have resulted in a large amount of publications during the last decade. This study demonstrates that there is no systematic examination on the research development in literature in the discipline of C and D waste management. This study presents the latest research trend in the discipline through analyzing the publications from 2000 to 2009 in eight major international journals. The analysis is conducted on the number of papers published annually, main authors' contributions, research methods and data analysis methods adopted, and research topics covered. The results exhibit an increasing research interest in C and D waste management in recent years. Researchers from developed economies have contributed significantly to the development of the research in the discipline. Some developing countries such as Malaysia and China have also been making good efforts in promoting C and D waste management research. The findings from this study also indicate that survey and case study are major methods for data collection, and the data are mostly processed through descriptive analysis. It is anticipated that more future studies on C and D waste management will be led by researchers from developing economies, where construction works will remain their major economic activities. On the other hand, more sophisticated modeling and simulating techniques have been used effectively in a number of studies on C and D waste management research, and this is considered a major methodology for future research in the discipline. C and D waste management will continue to be a hot research topic in the future, in particularly, the importance of human factors in C and D waste management has emerged as a new challenging topic.
Trend of the research on construction and demolition waste management.
Yuan, Hongping; Shen, Liyin
2011-04-01
Research interests in addressing construction and demolition (C&D) waste management issues have resulted in a large amount of publications during the last decade. This study demonstrates that there is no systematic examination on the research development in literature in the discipline of C&D waste management. This study presents the latest research trend in the discipline through analyzing the publications from 2000 to 2009 in eight major international journals. The analysis is conducted on the number of papers published annually, main authors' contributions, research methods and data analysis methods adopted, and research topics covered. The results exhibit an increasing research interest in C&D waste management in recent years. Researchers from developed economies have contributed significantly to the development of the research in the discipline. Some developing countries such as Malaysia and China have also been making good efforts in promoting C&D waste management research. The findings from this study also indicate that survey and case study are major methods for data collection, and the data are mostly processed through descriptive analysis. It is anticipated that more future studies on C&D waste management will be led by researchers from developing economies, where construction works will remain their major economic activities. On the other hand, more sophisticated modeling and simulating techniques have been used effectively in a number of studies on C&D waste management research, and this is considered a major methodology for future research in the discipline. C&D waste management will continue to be a hot research topic in the future, in particularly, the importance of human factors in C&D waste management has emerged as a new challenging topic. Copyright © 2010 Elsevier Ltd. All rights reserved.
Ojelabi, Rapheal A; Afolabi, Adedeji O; Oyeyipo, Opeyemi O; Tunji-Olayeni, Patience F; Adewale, Bukola A
2018-06-01
Integrating social client relationship management (CRM 2.0) in the built environment can enhance the relationship between construction organizations and client towards sustaining a long and lasting collaboration. The data exploration analyzed the e-readiness of contracting and consulting construction firms in the uptake of CRM 2.0 and the barriers encountered in the adoption of the modern business tool. The targeted organizations consist of seventy five (75) construction businesses operating in Lagos State which were selected from a pool of registered contracting and consulting construction firms using random sampling technique. Descriptive statistics of the e-readiness of contracting and consulting construction firms for CRM 2.0 adoption and barriers limiting its uptake were analyzed. Also, inferential analysis using Mann-Whitney U statistical and independent sample t-test was performed on the dataset obtained. The data generated will support construction firms on the necessity to engage in client social relationship management in ensuring sustainable client relationship management in the built environment.
Niu, Gang
2017-01-01
This book introduces condition-based maintenance (CBM)/data-driven prognostics and health management (PHM) in detail, first explaining the PHM design approach from a systems engineering perspective, then summarizing and elaborating on the data-driven methodology for feature construction, as well as feature-based fault diagnosis and prognosis. The book includes a wealth of illustrations and tables to help explain the algorithms, as well as practical examples showing how to use this tool to solve situations for which analytic solutions are poorly suited. It equips readers to apply the concepts discussed in order to analyze and solve a variety of problems in PHM system design, feature construction, fault diagnosis and prognosis.
Integrated Constructed Wetlands (ICW) for livestock wastewater management.
Harrington, Rory; McInnes, Robert
2009-11-01
Social, economic and environmental coherence is sought in the management of livestock wastewater. Wetlands facilitate the biogeochemical processes that exploit livestock wastewater and provide opportunities to achieve such coherence and also to deliver on a range of ecosystem services. The Integrated Constructed Wetland (ICW) concept integrates three inextricably linked objectives: water quantity and quality management, landscape-fit to improve aesthetic site values and enhanced biodiversity. The synergies derived from this explicit integration allow one of the key challenges for livestock management to be addressed. An example utilizing twelve ICW systems from a catchment on the south coast of Ireland demonstrates that over an eight year period mean reduction of total and soluble phosphorus (molybdate reactive phosphorus) exceeded 95% and the mean removal of ammonium-N exceeded 98%. This paper reviews evidence regarding the capacity of ICWs to provide a coherent and sustainable alternative to conventional systems.
Construction of a class of Daubechies type wavelet bases
International Nuclear Information System (INIS)
Li Dengfeng; Wu Guochang
2009-01-01
Extensive work has been done in the theory and the construction of compactly supported orthonormal wavelet bases of L 2 (R). Some of the most distinguished work was done by Daubechies, who constructed a whole family of such wavelet bases. In this paper, we construct a class of orthonormal wavelet bases by using the principle of Daubechies, and investigate the length of support and the regularity of these wavelet bases.
The Crisis Management Practices of Australian Construction Companies
Directory of Open Access Journals (Sweden)
M Loosemore
2012-11-01
Full Text Available Recent world events in the international relations arena and the subsequent knock-on affect on the insurance industry, have sent shock-waves through Australia’s business community,elevating crisis management to the top of the managerial agenda. This paperpresents the findings of exploratory research, which investigated the crisis managementpractices of construction companies. Using a diagnostic model of crisis preparednesswhich has been developed and tested across a broad range of industries, it concludes thatif the sample surveyed is typical, then crisis planning is rudimentary and undertaken in aninsular, informal, fragmented fashion, supported by few resources and little strategicguidance. Consequently, many construction companies will have an inadequate understandingof their crisis exposure, of how to cope with crises when they happen and of howto learn and recover from their aftermath.
Technology Trends and Opportunities for Construction Industry and Lifecycle Management
Janson, Vidar
2017-01-01
Master's thesis in for Offshore Technology: Industrial Asset Management The purpose of the report is to highlight methods that can make it easier for the construction industry and industry in general to benefit from new technology. The report is intended as a reference to technological solutions that along with some techniques, can streamline workflow for multiple tasks in planning, design, and operation and maintenance management. The problems focused on is how to: • Simplify the procu...
Evolutionary algorithms and metaheuristics in civil engineering and Construction management
Greiner, David
2015-01-01
This book focuses on civil and structural engineering and construction management applications. The contributions constitute modified, extended and improved versions of research presented at the minisymposium organized by the editors at the ECCOMAS conference on this topic in Barcelona 2014.
Directory of Open Access Journals (Sweden)
Aw Nien Wei
2017-11-01
Full Text Available The construction industry is the main economic support for all countries around the world in which continually adapting to meet competitive challenges around the global market. Nevertheless, the construction project is becoming much more complex and difficult to manage. This is because the construction project involves a large number of stakeholder, for example, the consultant companies, architects, engineers, building surveyors and quantity surveyors. The technology currently used in the construction industry is the AutoCAD (Automatic computeraided design. AutoCAD is a commercial software application for 2D and 3D computer-aided design (CAD and drafting develop by Autodesk. Generally, all the drawing design from Autocad will be exchanged among the stakeholder in the form of paper. Information exchanged among them mostly involves a lot of documents and drawings. This practice creates errors because of documents and drawings are mostly in a paper-based format that is not properly managed which results in miscommunication among them. Having wrong information in the construction process could hinder the productivity of projects because in a construction project information is one of the important construction materials. Building Information Modeling (BIM is one of the newly software in the architecture, engineering, and construction (AEC industries to ensure all parties receive the right information. BIM technology is also an intelligent model of a building constructed digitally in the way of 3D. The software will generate model containing the information needed to support the construction, fabrication, and procurement activities that needed to realize the building. This paper will discuss on potential and benefits of BIM during pre-construction stage, construction stage and during post construction stage
Looking back on safety management in construction of advanced thermal nuclear power plant 'Fugen'
International Nuclear Information System (INIS)
Emori, Kengo
1979-01-01
The safety management of the advanced thermal nuclear power plant ''Fugen'' during the period from the preparation of plant construction in October, 1970, to the full power operation in March, 1979, is looked back and explained. Any large human and material accidents did not occur during the long construction time. The total numbers of persons and hours were 1.397 x 10 6 workers and 11.55 x 10 6 hours, respectively. The number of labor accidents was twenty with no dead person, the number of loss days was 645 days, the number of accident rate was 1.73, the intensity rate was 0.06, and the mean rate of labor accidents per year per 1000 workers was 6.4. The radiation exposure dose was 65.27 man-rem for the managed 1804 workers in total, during the testing and operating periods. These data show that the safety management for ''Fugen'' is very excellent, considering the following special features: 1) there were many works which were carried out for the first time, 2) the construction of the plant was conducted by five contractors taking partial charge, there were many kinds of construction works, the construction and testing periods were long, and the workers had to go to the site from Tsuruga city by car and bus. The organization of preventing disasters, the concrete implementation items for safety management, including the planning of activities, various meetings, patrol, education and training, the honoring system, the prevention of traffic accident and so on, and the results of actual safety management are explained with the reflection. (Nakai, Y.)
International Nuclear Information System (INIS)
Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi
2015-01-01
Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)
Knowledge Management Practice in Two Australian Architecture-Engineering-Construction (AEC Companies
Directory of Open Access Journals (Sweden)
Patrick Zou
2012-11-01
Full Text Available Knowledge management (KM could be described as a management system that supports the creation, sharing and retrieving of valued information, expertise and insight within and across communities of people and related organizations using information and communication technologies and hence it is a combination of the effective application of information technlogy and management of human resources. KM is becoming a core competitive factor in construction operations. This paper presents the results of two case studies of KM practices in large AEC (architecture, engineering and construction companies through desk-top study and semi-structured interviews. The results indicate that implementing KM in AEC companies leads to competitive advantages and improved decision-making, problem solving and business performance. The results also indicateed that while technology plays an important role, top management commitment, total employee involvement, performance assessment and the culture of knowledge-learning and sharing must be considered when implementing KM. Therefore it is suggested that the implementation of KM should incorporate the company's vision, work processes, technology and culture, to improve the ability of knowledge creating, capturing, sharing, retrieving and ultimately, to improve the company's competitive advantage, decision making, problem solving and innovation.
A Production Model for Construction: A Theoretical Framework
Directory of Open Access Journals (Sweden)
Ricardo Antunes
2015-03-01
Full Text Available The building construction industry faces challenges, such as increasing project complexity and scope requirements, but shorter deadlines. Additionally, economic uncertainty and rising business competition with a subsequent decrease in profit margins for the industry demands the development of new approaches to construction management. However, the building construction sector relies on practices based on intuition and experience, overlooking the dynamics of its production system. Furthermore, researchers maintain that the construction industry has no history of the application of mathematical approaches to model and manage production. Much work has been carried out on how manufacturing practices apply to construction projects, mostly lean principles. Nevertheless, there has been little research to understand the fundamental mechanisms of production in construction. This study develops an in-depth literature review to examine the existing knowledge about production models and their characteristics in order to establish a foundation for dynamic production systems management in construction. As a result, a theoretical framework is proposed, which will be instrumental in the future development of mathematical production models aimed at predicting the performance and behaviour of dynamic project-based systems in construction.
Complexity, Contract Design and Incentive Design in the Construction Management Industry
Beg, Zeshawn Afsari
2015-01-01
In this paper I examine how one construction management company uses contract design and incentive design to respond to aspects of task complexity and relationship complexity present in its construction projects. In terms of contract design, I find that the company is unable to increase its use of cost-plus pricing when faced with technically complex projects. Instead, the company uses increased pre-execution design modification and price markups when technically complex projects are contract...
A constructivist approach for teaching research methodology in construction management
Hartmann, Andreas; Doree, Andries G.; Martin, Ludwig
2010-01-01
Construction Management (CM) is an acknowledged field of expertise and profession that requires students to research real world problems. To prepare the students for this task, many CM programs contain a Research Methodology (RM) course. However, after taking part in these courses, many students
A Framework For A Decision Support Model For Supply Chain Management In The Construction Industry
Perdomo-Rivera, Jose Luis
2004-01-01
Materials are one of the areas that require special attention while creating a project's master plan as well as during the daily construction progress. The absence of materials when needed is one of the main causes of loss of productivity at a jobsite. Inefficient materials management can lead to an increase of 50% in work hours. As a result, a detailed plan for the materials management of each construction project is necessary. The critical role of materials management in the su...
DEFF Research Database (Denmark)
Brix, Hans; Koottatep, Thammarat; Fryd, Ole
2010-01-01
Constructed wetland systems for wastewater management may have great potential in developing countries as robust and decentralized solution. A case study from Koh Phi Phi island in Thailand where a constructed wetland systems was established after the destructions by the tsunami in 2004...... is described. The project includes a wastewater collection system for the main business area of the island, a pumping station, a multistage constructed wetland system, and a system for reuse of treated wastewater. The wastewater is treated to meet the Thai effluent standards for total suspended solids......, the system is only partly a success, mainly because no key-person or key-authority took responsibility for managing the system....
Incorporating Lean Construction agent into the Building Standards Act: the Spanish case study
Directory of Open Access Journals (Sweden)
Brioso Xavier
2016-12-01
Full Text Available There is a demand for lean construction in Europe; even though lean construction is still an emerging field and there is growing interest, there are no regulations on this topic. The main objective of this research is to regulate this role when in a project and to define and develop a building agent structure, according to the Building Standards Act (LOE by its acronym in Spanish, to be able to incorporate it into the Spanish law, protecting it from civil liabilities. In Spain, there is jurisprudence in civil jurisdiction based on the LOE to acquit or convict building agents, who are defined in the courts as “constructive managers” or similar. For this reason, courts could establish in the future several liabilities for the lean construction specialist and other agents of the project, depending on their actions and based on the implementation of the lean project delivery system, the target value design and the integrated project delivery. Conversely, it is possible that the level of action of the lean construction specialist may comprise design management, construction management and contract management. Accordingly, one or more building agents should be appropriately incorporated into the LOE according to their functions and responsibilities and based on the levels of action of the lean construction specialist. The creation of the following agents is proposed: design manager, construction manager and contract manager, definitions that are developed in this study. These agents are loosely defined, because any project manager, building information modeling manager or similar may act as one or as more-than-one of them. Finally, the creation of the lean construction manager is also proposed, as the agent who takes on the role of the design manager, construction manager and contract manager, but focused on the lean production principles.
Wang, Lake
2012-01-01
This research explores the leadership constructs of global leaders and Chinese managers in multi-national corporations (MNCs) in order to understand whether their constructs are misaligned, and if so, in what ways. To address these questions, data was gathered via repertory grid test interviews with 31 global leaders and 59 Chinese managers in six MNCs’ China organizations. Analysis subsequently revealed that global leaders rely upon twelve key constructs to define global leaders...
Page, Damien
2013-01-01
This article presents findings from a study of 14 heads of construction in further education colleges in England as they manage the transition of new construction lecturers from a culture of hypermasculinity to one of emotional labour and caring. It focuses firstly on the dilemmas faced by heads of construction at the recruitment stage before…
2011-02-15
...] Underground Construction Standard; Extension of the Office of Management and Budget's (OMB) Approval of... Underground Construction (29 CFR 1926.800). DATES: Comments must be submitted (postmarked, sent, or received...). Seven paragraphs in the Underground Construction Standard (``the Standard''), 29 CFR 1926.800, require...
Determinants of Management Innovation in the Ghanaian Construction Consulting Sector
Directory of Open Access Journals (Sweden)
De-Graft Owusu-Manu
2015-03-01
Full Text Available Determinants of management innovation (MI within the Ghanaian construction consulting sector are examined. A sample of 70 consulting firms is surveyed using self-administered questionnaires. Data are analysed using descriptive statistics and factor analysis. Findings indicate that determinants of MI were interwoven among seven principal factors viz: community and market demands; financial and business management practices; human resource policies; creativity and organizational strategies; corporate social responsibility; prevailing conditions; and competitive leverage. The study adds to the discourse on evolution of innovation within the global consulting sector generally, while providing reference for practitioners and academics in the field with respect to MI determinants more specifically. It is envisaged that practitioners who adopt these findings in the construction consultancy sector would enhance their ability to provide innovative services to clients. Study recommendations include that future research should explore how innovation is diffused within consulting enterprises’ value chains. Paper Type: Research article
Research and practice of informatization construction in waste treatment and management
International Nuclear Information System (INIS)
Kong Jinsong; Guo Weiqun; Yu Ren; Xiang Xinmin
2013-01-01
The goal, content and requirement of the informatization construction in waste treatment and management in nuclear power system are discussed in the paper, as well as some key problems in this process. Taking the engineering practice of informatization construction in a waste treatment center as an example, the composition and architecture of the information system, the consideration and the solution methods of some key problems in system design and development are introduced in the paper. (authors)
Directory of Open Access Journals (Sweden)
Rockson Dobgegah
2011-03-01
Full Text Available The study adopts a data reduction technique to examine the presence of any complex structure among a set of project management competency variables. A structured survey questionnaire was administered to 100 project managers to elicit relevant data, and this achieved a relatively high response rate of 54%. After satisfying all the necessary tests of reliability of the survey instrument, sample size adequacy and population matrix, the data was subjected to principal component analysis, resulting in the identification of six new thematic project management competency areas ; and were explained in terms of human resource management and project control; construction innovation and communication; project financial resources management; project risk and quality management; business ethics and; physical resources and procurement management. These knowledge areas now form the basis for lateral project management training requirements in the context of the Ghanaian construction industry. Key contribution of the paper is manifested in the use of the principal component analysis, which has rigorously provided understanding into the complex structure and the relationship between the various knowledge areas. The originality and value of the paper is embedded in the use of contextual-task conceptual knowledge to expound the six uncorrelated empirical utility of the project management competencies.
Strategies for healthcare facilities, construction, and real estate management.
Lee, James G
2012-05-01
Adventist HealthCare offers the following lessons learned in improving the value of healthcare facilities, construction, and real estate management: Use an integrated approach. Ensure that the objectives of the approach align the hospital or health system's mission and values. Embrace innovation. Develop a plan that applies to the whole organization, rather than specific business units. Ensure commitment of senior leaders.
Directory of Open Access Journals (Sweden)
Sh. T. Ismailova
2017-01-01
Full Text Available Objectives. Relevant problems related to the adoption of unprogrammed solutions in the process of managing the production activity of a construction enterprise in unstable, a priori underdetermined economic environments are addressed.The aim of the study is todevelop tools and methods for assessing the effectiveness of the current state of construction production and on this basis to identify the most effective management of a construction organisation under unstable market conditions.Methods. The methodology of the conducted research is based on the application of the mathematical apparatus of fuzzy sets for the processing of expert data and the formation on this basis of linguistic functions that determine the analytical relationship between various indicators of the production activity of the construction organisation.Results. A method is developed for processing expert data using fuzzy logic, making it possible to form an analytical relationship between the performance indicators of the production activity of the construction organisation and the management parameters that determine its current state. An alternative means for selecting the most effective management approach, accounting for its influence on the efficiency of the production activity of the construction organisation, is developed.Conclusion. An information-economic model of situational management of the development of a construction organisation is developed. The proposed tools and methods allow the effective management of the production activity of the construction organisation to be organised, and on this basis to increase the efficiency of production under different economic conditions in the presence of spontaneously arising perturbative factors. The methodical approach to the organisation of management of the production activity efficiency of the construction organisation allows the effective subsystems of management
Incentive Model Based on Cooperative Relationship in Sustainable Construction Projects
Directory of Open Access Journals (Sweden)
Guangdong Wu
2017-07-01
Full Text Available Considering the cooperative relationship between owners and contractors in sustainable construction projects, as well as the synergistic effects created by cooperative behaviors, a cooperative incentive model was developed using game theory. The model was formulated and analyzed under both non-moral hazard and moral hazard situations. Then, a numerical simulation and example were proposed to verify the conclusions derived from the model. The results showed that the synergistic effect increases the input intensity of one party’s resource transfer into the increase of marginal utility of the other party, thus the owner and contractor are willing to enhance their levels of effort. One party’s optimal benefit allocation coefficient is positively affected by its own output efficiency, and negatively affected by the other party’s output efficiency. The effort level and expected benefits of the owner and contractor can be improved by enhancing the cooperative relationship between the two parties, as well as enhancing the net benefits of a sustainable construction project. The synergistic effect cannot lower the negative effect of moral hazard behaviors during the implementation of sustainable construction projects. Conversely, the higher levels of the cooperative relationship, the wider the gaps amongst the optimal values under both non-moral hazard and moral hazard situations for the levels of effort, expected benefits and net project benefits. Since few studies to date have emphasized the effects of cooperative relationship on sustainable construction projects, this study constructed a game-based incentive model to bridge the gaps. This study contributes significant theoretical and practical insights into the management of cooperation amongst stakeholders, and into the enhancement of the overall benefits of sustainable construction projects.
Yiu, Nicole S N; Sze, N N; Chan, Daniel W M
2018-02-01
In the 1980s, the safety management system (SMS) was introduced in the construction industry to mitigate against workplaces hazards, reduce the risk of injuries, and minimize property damage. Also, the Factories and Industrial Undertakings (Safety Management) Regulation was introduced on 24 November 1999 in Hong Kong to empower the mandatory implementation of a SMS in certain industries including building construction. Therefore, it is essential to evaluate the effectiveness of the SMS in improving construction safety and identify the factors that influence its implementation in Hong Kong. A review of the current state-of-the-practice helped to establish the critical success factors (CSFs), benefits, and difficulties of implementing the SMS in the construction industry, while structured interviews were used to establish the key factors of the SMS implementation. Results of the state-of-the-practice review and structured interviews indicated that visible senior commitment, in terms of manpower and cost allocation, and competency of safety manager as key drivers for the SMS implementation. More so, reduced accident rates and accident costs, improved organization framework, and increased safety audit ratings were identified as core benefits of implementing the SMS. Meanwhile, factors such as insufficient resources, tight working schedule, and high labor turnover rate were the key challenges to the effective SMS implementation in Hong Kong. The findings of the study were consistent and indicative of the future development of safety management practice and the sustainable safety improvement of Hong Kong construction industry in the long run. Copyright © 2018 National Safety Council and Elsevier Ltd. All rights reserved.
Asheim, B.T.; Boschma, R.A.; Cooke, P.
2011-01-01
Constructing regional advantage: platform policies based on related variety and differentiated knowledge bases, Regional Studies. This paper presents a regional innovation policy model based on the idea of constructing regional advantage. This policy model brings together concepts like related
Assessment Attributes on Effective Construction Management for Property Developers in Malaysia
Directory of Open Access Journals (Sweden)
Ayob Norizam
2014-06-01
attributes. Comparison was made with attributes from Project Management Book of Knowledge in order to explore the underlying suitability of the proposed attributes with the study area in terms of climate, economy, etc. Factor Analysis was adopted to investigate the group component relationships. This study focuses on the link between CSFs and the implementation of an effective construction management specifically for property developers in Malaysia.
Application of 3D model in the schedule management of nuclear power plant construction
International Nuclear Information System (INIS)
Nian Fayang
2009-01-01
While 3D technology has been widely used in engineering design, the 3D model of engineering design also includes information that can be used to construction. By the visual interface, the 3D model can be used in different aspects of construction. By linking the 3D model with the construction schedule, the 4D model can be created, through which the visual manage of the construction schedule can be achieved. (authors)
Problems of improving the investing process management in NPP construction
International Nuclear Information System (INIS)
Denisov, G.A.
1986-01-01
Problems of development of the optimal system for the investing process management in NPP construction are discussed. It includes 3 steps: design construction ( including building structure and equipment production ), and achievement of designed technical and economical indices, during reactor start-up. The method for estimating the interest of each participator of the intensing process and developing the optimal solution, that is capable to approach these interests, is suggested. The conclusion is made that it is necessary to develop and confirm the branch standard, which should include a complex amalgamated network of works to improve the organization of the investing process
Kluchnikova, O.; Pobegaylov, O.
2017-11-01
The article focuses on the basic theory and practical aspects of the strategic management improving in terms of enhancing the quality of a technological process: these aspects have been proven experimentally by their introduction in company operations. The authors have worked out some proposals aimed at the selection of an optimal supplier for building companies as well as the algorithm for the analysis and optimization of a construction company basing on scientific and practical research as well as on the experimental data obtained in the experiment.
A simulation model of hospital management based on cost accounting analysis according to disease.
Tanaka, Koji; Sato, Junzo; Guo, Jinqiu; Takada, Akira; Yoshihara, Hiroyuki
2004-12-01
Since a little before 2000, hospital cost accounting has been increasingly performed at Japanese national university hospitals. At Kumamoto University Hospital, for instance, departmental costs have been analyzed since 2000. And, since 2003, the cost balance has been obtained according to certain diseases for the preparation of Diagnosis-Related Groups and Prospective Payment System. On the basis of these experiences, we have constructed a simulation model of hospital management. This program has worked correctly at repeated trials and with satisfactory speed. Although there has been room for improvement of detailed accounts and cost accounting engine, the basic model has proved satisfactory. We have constructed a hospital management model based on the financial data of an existing hospital. We will later improve this program from the viewpoint of construction and using more various data of hospital management. A prospective outlook may be obtained for the practical application of this hospital management model.
Directory of Open Access Journals (Sweden)
Daniela Núñez
2018-03-01
Full Text Available Knowledge management (KM is a key element for the development of small-to-medium enterprises (SMEs in the construction industry. This is particularly relevant in Chile, where this industry is composed almost entirely of SMEs. Although various KM system proposals can be found in the literature, they are not suitable for SMEs, due to usability problems, budget constraints, and time and connectivity issues. Mobile Cloud Computing (MCC systems offer several advantages to construction SMEs, but they have not yet been exploited to address KM needs. Therefore, this research is aimed at the development of a MCC-based KM platform to manage lessons learned in different construction projects of SMEs, through an iterative and user-centered methodology. Usability and quality evaluations of the proposed platform show that MCC is a feasible and attractive option to address the KM issues in SMEs of the Chilean construction industry, since it is possible to consider both technical and usability requirements.
Computer aided construction engineering system for nuclear power plants
International Nuclear Information System (INIS)
Yoshinaga, Toshiaki; Nakajima, Akira; Miyahara, Ryohei; Miura, Jun
1990-01-01
The construction CAE system for nuclear power plants is the tool for the construction work simulator (procedure, processes and management simulation) connected to 3D-CAD (three-dimensional plant layout planning CAD). The data used for construction work simulation are registered in the data base as the installation smallest unit data from the 3D-CAD. This construction work simulator comprises the automatic installation procedure decision system, with which a construction planner decides installation procedure by using a high performance graphic work station, and based on a 3D-CAD model, utilizing empirical procedure logic, the dialogue system for making the installation procedure more optimal by utilizing effectively the graphic function, the evaluation system for synthetically evaluating workability, personnel plan and so on by adding the simulation of human behavior based on these procedures, the schedule system which carries out work process simulation based on the above, the data base system for letting to do these plans effectively and the project management system. By means of these, the plant construction of high quality is expected. (K.I.)
International Nuclear Information System (INIS)
Yan Yingdi; Gu Jian
2013-01-01
The main purpose of earth and stone work for Fuqing nuclear power plant is to solve problems of the main plant and the temporary accommodation site and also providing aggregate, marine stone and backfill as well. For a reasonable arrangement of stacking, using and spoiling, a dynamic balance management is performed in the project based on the initial design by the plant design institute. The design result would be used to conduct the construction arrangement, for avoiding the risk of earth and stone shortage, and enhancing the economic benefits. By discussing on problems existed in the balanced management of earth and stone, some suggestions are raised in this paper for optimizing earth and stone medium-and long-term management. (authors)
Teaching Construction: A Design-Based Course Model
Love, Tyler S.; Salgado, Carlos A.
2016-01-01
The focus on construction in T&E education has drastically changed. This article presents a series of topics and design-based labs that can be taught at various grade levels to integrate STEM concepts while also increasing students' overall awareness of construction and structural technologies.
A model for evaluating the social performance of construction waste management
International Nuclear Information System (INIS)
Yuan Hongping
2012-01-01
Highlights: ► Scant attention is paid to social performance of construction waste management (CWM). ► We develop a model for assessing the social performance of CWM. ► With the model, the social performance of CWM can be quantitatively simulated. - Abstract: It has been determined by existing literature that a lot of research efforts have been made to the economic performance of construction waste management (CWM), but less attention is paid to investigation of the social performance of CWM. This study therefore attempts to develop a model for quantitatively evaluating the social performance of CWM by using a system dynamics (SD) approach. Firstly, major variables affecting the social performance of CWM are identified and a holistic system for assessing the social performance of CWM is formulated in line with feedback relationships underlying these variables. The developed system is then converted into a SD model through the software iThink. An empirical case study is finally conducted to demonstrate application of the model. Results of model validation indicate that the model is robust and reasonable to reflect the situation of the real system under study. Findings of the case study offer helpful insights into effectively promoting the social performance of CWM of the project investigated. Furthermore, the model exhibits great potential to function as an experimental platform for dynamically evaluating effects of management measures on improving the social performance of CWM of construction projects.
Maturity of project management in construction companies with the use of fuzzy numbers
Klaus-Rosińska, Agata; Kuchta, Dorota
2017-07-01
The main aim of the article is to describe issue of maturity in project management regarding construction companies. Taking into consideration this problem the literature research was made, existing project management maturity models were analyzed, model of maturity in project management (using fuzzy numbers approach) was described and tested. The results of testing stage are shown in the case study.
COMPARISON OF TRENDS IN RISK MANAGEMENT THEORY AND PRACTICES WITHIN THE CONSTRUCTION INDUSTRY
Dena Crnković; Mladen Vukomanović
2016-01-01
This study considered the problem of understanding and use of risk management methods in construction projects and their representation in the literature and their practical application. Research of trends in risk management was conducted using studies from the EBSCO database that were published in the period from 1999 to 2015. The focus included the development of two terms, namely traditional and holistic approach to risk management as well as to uncertainty and opportunity management. The ...
Degree-based graph construction
International Nuclear Information System (INIS)
Kim, Hyunju; Toroczkai, Zoltan; Erdos, Peter L; Miklos, Istvan; Szekely, Laszlo A
2009-01-01
Degree-based graph construction is a ubiquitous problem in network modelling (Newman et al 2006 The Structure and Dynamics of Networks (Princeton Studies in Complexity) (Princeton, NJ: Princeton University Press), Boccaletti et al 2006 Phys. Rep. 424 175), ranging from social sciences to chemical compounds and biochemical reaction networks in the cell. This problem includes existence, enumeration, exhaustive construction and sampling questions with aspects that are still open today. Here we give necessary and sufficient conditions for a sequence of nonnegative integers to be realized as a simple graph's degree sequence, such that a given (but otherwise arbitrary) set of connections from an arbitrarily given node is avoided. We then use this result to present a swap-free algorithm that builds all simple graphs realizing a given degree sequence. In a wider context, we show that our result provides a greedy construction method to build all the f-factor subgraphs (Tutte 1952 Can. J. Math. 4 314) embedded within K n setmn S k , where K n is the complete graph and S k is a star graph centred on one of the nodes. (fast track communication)
EPR project construction cost control
International Nuclear Information System (INIS)
Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.
2001-01-01
The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)
Enzyme based soil stabilization for unpaved road construction
Directory of Open Access Journals (Sweden)
Renjith Rintu
2017-01-01
Full Text Available Enzymes as soil stabilizers have been successfully used in road construction in several countries for the past 30 years. However, research has shown that the successful application of these enzymes is case specific, emphasizing that enzyme performance is dependent on subgrade soil type, condition and the type of enzyme used as the stabilizer. A universal standard or a tool for road engineers to assess the performance of stabilized unbound pavements using well-established enzymes is not available to date. The research aims to produce a validated assessment tool which can be used to predict strength enhancement within a generalized statistical framework. The objective of the present study is to identify new materials for developing the assessment tool which supports enzyme based stabilization, as well as to identify the correct construction sequence for such new materials. A series of characterization tests were conducted on several soil types obtained from proposed construction sites. Having identified the suitable soil type to mix with the enzyme, a trial road construction has been performed to investigate the efficiency of the enzyme stabilization along with the correct construction sequence. The enzyme stabilization has showed significant improvement of the road performance as was evidenced from the test results which were based on site soil obtained before and after stabilization. The research will substantially benefit the road construction industry by not only replacing traditional construction methods with economical/reliable approaches, but also eliminating site specific tests required in current practice of enzyme based road construction.
BASIC ACTUAL AND EFFECTIVENESS OF LEADERSHIP STYLES OF CONSTRUCTION PROJECT MANAGERS IN SURABAYA
Directory of Open Access Journals (Sweden)
Andi Andi
2004-01-01
Full Text Available Leading is one of the most important facets in managing construction projects, and behaving as an effective leader is a vital project manager’s responsibility to ensure that work efforts of other persons are directed toward the accomplishment of organizational objectives. This paper aims to determine basic and actual leadership styles of construction project managers in Surabaya. The effectiveness of the actual leadership style is also examined. To accomplish the objective, the paper first briefly reviews the ways in which leadership is approached. Data were then collected through an empirical survey to 46 project managers, taking Fiedler and Hersey-Blanchard’s models as the point of departure. The results indicate that the basic leadership of project managers in Surabaya falls slightly on task-oriented behavior. Meanwhile selling is the most common style used as actual leadership in practice. The paper discusses the effectiveness of the styles adopted and situational variables affecting.
Performance and competence in usage-based construction grammar
DEFF Research Database (Denmark)
Jensen, Kim Ebensgaard
2014-01-01
While formalist approaches in the Chomskian tradition to language distinguish sharply between performance and competence in their modeling of language competence, performance and competence are considered to be in a mutually influential relation in usage-based models of language. Language...... competence, in the latter approach, is, much like in Dell Hymes’ notion of communicative competence, held to be experientially based in the sense that speakers establish their competence through inductive social-cognitive processes of schematization and conventionalization. Making a case for the usage......-based definition of the language system, his paper explores the interplay between performance and competence in a construction grammar perspective in which grammatical constructions are considered meaningful symbolic units on par with lexemes, in relation to the [V until ADJ]-construction, based on a study...
Directory of Open Access Journals (Sweden)
Jing-chun Feng
2011-06-01
Full Text Available Recently, the critical chain study has become a hot issue in the project management research field. The construction of the critical chain with multi-resource constraints is a new research subject. According to the system analysis theory and project portfolio theory, this paper discusses the creation of project portfolios based on the similarity principle and gives the definition of priority in multi-resource allocation based on quantitative analysis. A model with multi-resource constraints, which can be applied to the critical chain construction of the A-bid section in the South-to-North Water Diversion Project, was proposed. Contrast analysis with the comprehensive treatment construction method and aggressive treatment construction method was carried out. This paper also makes suggestions for further research directions and subjects, which will be useful in improving the theories in relevant research fields.
Effect of Pre-Construction on Construction Schedule and Client Loyalty
Jong Hoon Kim; Hyun-Soo Lee; Moonseo Park; Min Jeong; Inbeom Lee
2016-01-01
Pre-construction is essential in achieving the success of a construction project. Due to the early involvement of project participants in the construction phase, project managers are able to plan ahead and solve issues well in advance leading to the success of the project and the satisfaction of the client. This research utilizes quantitative data derived from construction management projects in order to identify the relationship between pre-construction, construction schedule, and client sat...
Directory of Open Access Journals (Sweden)
Nuria Calvo
2014-01-01
Full Text Available According to the recent Spanish legislation, the amount of non-hazardous construction and demolition waste (C&D waste by weight must be reduced by at least 70% by 2020. However, the current behavior of the stakeholders involved in the waste management process make this goal difficult to achieve. In order to boost changes in their strategies, we firstly describe an Environmental Management System (EMS based on regulation measures and economic incentives which incorporate universities as a key new actor in order to create a 3Rs model (Reduce, Reuse and Recycle in the C&D waste management with costs savings. The target areas are focused mainly on producer responsibility, promotion of low-waste building technologies and creation of green jobs to fulfill three main objectives: valorization of inert wastes, elimination of illegal landfills and stimulation of demand for recycled C&D wastes. To achieve this latter goal, we have also designed a simulation model—using the Systems Dynamic methodology—to assess the potential impact of two policies (incentives and tax penalties in order to evaluate how the government can influence the behavior of the firms in the recycling system of C&D waste aggregates. This paper finds a broader understanding of the socioeconomic implications of waste management over time and the positive effects of these policies in the recycled aggregates market in order to achieve the goal of 30% C&D waste aggregates in 12 years or less.
Construction management at the SP-100 ground engineering system test site
International Nuclear Information System (INIS)
Burchell, G.P.; Wilson, L.R.
1991-01-01
Contractors under the U.S. Department of Energy management have implemented a comprehensive approach to the management of design and construction of the complex facility modifications at the SP-100 Ground Engineering System Test Site on the Hanford Reservation. The SP-100 Test Site employs a multi-organizational integrated management approach with clearly defined responsibilities to assure success. This approach allows for thorough planning and analysis before the project kick off, thus minimizing the number and magnitude of problems which arise during the course of the project. When combined with a comprehensive cost and schedule/project management reporting system the problems which do occur are recognized early enough to assure timely intervention and resolution
2012-08-10
... Lead in Construction Standard; Extension of the Office of Management and Budget's (OMB) Approval of... proposal to extend the Office of Management and Budget's (OMB) approval of the information collection requirements specified in the Lead in Construction Standard (29 CFR 1926.62). DATES: Comments must be submitted...
The Challenge of Space Infrastructure Construction
Howe, A. Scott; Colombano, Silvano P.
2010-01-01
This paper reviews the range of technologies that will contribute to the construction of space infrastructure that will both enable and, in some cases, provide the motivation for space exploration. Five parts are addressed: Managing complexity, robotics based construction, materials acquisition, manufacturing, and self-sustaining systems.
Barriers of lean construction implementation in the Moroccan construction industry
Bajjou, Mohamed Saad; Chafi, Anas
2018-04-01
Improving the production system performance has become a fundamental pillar that must be taken into consideration in the construction industry. Recent developments in the construction sector have led to renewed interest in new techniques of management. Lean Construction is a very effective approach that has gained a high popularity by its ability to eliminate waste and maximize the value for the customer. Although both developed and developing countries have gained large benefits by implementing Lean Construction approach, several experiences showed many barriers that are hindering its implementation especially in developing countries. This paper aims to assess the critical barriers to the successful implementation in the Moroccan construction industry. Based on a literature review, followed by an analysis of data collected from a questionnaire survey which targeted 330 practitioners in the Moroccan construction field, several barriers were identified as key barriers. The findings of this investigation revealed that there are significant barriers such as Lack of knowledge about Lean Construction concepts, Unskilled Human Resources, and insufficient financial resources.
PRIORITISING LEAN CONSTRUCTION BARRIERS IN UGANDA'S CONSTRUCTION INDUSTRY
Directory of Open Access Journals (Sweden)
Henry Mwanaki Alinaitwe
2009-06-01
Full Text Available Engaging in lean construction efforts could prove to be highly rewarding for building firms in Uganda. However, lean construction is risky and can be disastrous if not properly managed. Lean production efforts in some other countries have not been successful due to the many barriers to its successful implementation. To enable sound lean construction efforts and to increase the chances of success in eliminating waste, a thorough investigation of the barriers is essential. This study presents 31 barriers and investigates their influence (strength on the success of lean construction initiatives. Structured interviews were carried out with technical managers of building firms to assess their perception of the barriers to lean production based on their experience at their firms. The strongest barrier is the provision of inputs exactly when required. Additionally, the barriers were ranked according to the ease of overcoming each. The easiest barrier to overcome is keeping the required items in the right place. Finally, a graphical aid is provided to enable decision makers to concentrate their efforts on the influential (strong, yet easy to overcome barriers. A lack of buildable designs and a participative management style for the workforce are the most important barriers to successful waste reduction in terms of strength and ease of overcoming. On the other hand, a lack of an organisational culture that supports teamwork, a lack of prefabrication and a lack of knowledgeable and skilled workers are regarded as low in strength, and at the same time difficult to overcome.
Positive experience in the construction and project management of Kashiwazaki-Kariwa no. 6 and no. 7
International Nuclear Information System (INIS)
Minematsu, A.
1999-01-01
Kashiwazaki-Kariwa No.6 and No.7 (K-6/7), the world first Advanced Boiling Water Reactor (ABWR) units, started commercial operations on November 7, 1996 and July 2, 1997 respectively. ABWR has been developed as a standard design of the next generation BWR to meet common goals set by the Japanese electric utilities and BWR manufacturers (GE, Hitachi and Toshiba) based on our design, construction, operation and maintenance experience of nuclear power plants. The construction of K-6/7 and confirmatory tests for the verification of the first-of-a-kind (FOAK) design features of ABWR were conducted smoothly without any delay. The duration of the construction was 51.5 months. It was shorter than conventional BWRs in Japan by nearly one year. This was realized by design features of ABWR for better constructability, a principle of 'test before use' applied to the FOAKs, advanced construction technology, detailed engineering at very early stages of the project, and good construction management. The positive experience in the K-6/7 project is now being reviewed and standardized for next ABWR projects. The data and knowledge accumulated through the K-6/7 project will be utilized effectively with the aide of the latest information technology. (author)
KERMA-based radiation dose management system for real-time patient dose measurement
Kim, Kyo-Tae; Heo, Ye-Ji; Oh, Kyung-Min; Nam, Sang-Hee; Kang, Sang-Sik; Park, Ji-Koon; Song, Yong-Keun; Park, Sung-Kwang
2016-07-01
Because systems that reduce radiation exposure during diagnostic procedures must be developed, significant time and financial resources have been invested in constructing radiation dose management systems. In the present study, the characteristics of an existing ionization-based system were compared to those of a system based on the kinetic energy released per unit mass (KERMA). Furthermore, the feasibility of using the KERMA-based system for patient radiation dose management was verified. The ionization-based system corrected the effects resulting from radiation parameter perturbations in general radiography whereas the KERMA-based system did not. Because of this difference, the KERMA-based radiation dose management system might overestimate the patient's radiation dose due to changes in the radiation conditions. Therefore, if a correction factor describing the correlation between the systems is applied to resolve this issue, then a radiation dose management system can be developed that will enable real-time measurement of the patient's radiation exposure and acquisition of diagnostic images.
Pilot-based assessment of the economics of recycling construction demolition waste.
Srour, Issam M; Chehab, Ghassan R; El-Fadel, Mutasem; Tamraz, Sandy
2013-11-01
The significant amount of waste generated from construction demolition has become a chronic problem in many developing countries. Using data obtained from demolition contractors and various other sources, this paper proposes a framework for proper handling of construction demolition waste (CDW) to serve as a decision support tool in countries suffering from the lack of national CDW management guidelines. The framework is then demonstrated through a case study in the city of Beirut, Lebanon, and a sensitivity analysis is carried out to examine the economic feasibility of developing a recycling facility. The analysis showed that in order for a facility to be feasible, a gate fee should be charged in the presence of a market for recycled aggregates. The results confirm the significance of instigating and implementing legislation to control illegal dumping, constructing, and managing engineered landfills, and establishing markets for recycled CDW.
Analysis and management of risks experienced in tunnel construction
Directory of Open Access Journals (Sweden)
Cagatay Pamukcu
2015-12-01
Full Text Available In this study, first of all, the definitions of "risk", "risk analysis", "risk assessment" and "risk management" were made to avoid any confusions about these terms and significance of risk analysis and management in engineering projects was emphasized. Then, both qualitative and quantitative risk analysis techniques were mentioned and within the scope of the study, Event Tree Analysis method was selected in order to analyze the risks regarding TBM (Tunnel Boring Machine operations in tunnel construction. After all hazards that would be encountered during tunnel construction by TBM method had been investigated, those hazards were undergoing a Preliminary Hazard Analysis to sort out and prioritize the risks with high scores. When the risk scores were taken into consideration, it was seen that the hazards with high risk scores could be classified into 4 groups which are excavation + support induced accidents, accidents stemming from geologic conditions, auxiliary works, and project contract. According to these four classified groups of initiating events, Event Tree Analysis was conducted by taking into care 4 countermeasures apart from each other. Finally, the quantitative and qualitative consequences of Event Tree Analyses, which were undertaken for all initiating events, were investigated and interpreted together by making comparisons and referring to previous studies.
Construction management and economics: the epistemology of a multidisciplinary design science
Voordijk, Johannes T.
2009-01-01
Research in the field of construction management and economics (CME) can be characterized as a multidisciplinary design science. Results from the sciences and humanities are necessary inputs for this field of research that deals with design, production and operation of the built environment. The
A role-play approach for teaching research methodology in construction management
Hartmann, Andreas; Doree, Andries G.; Martin, Ludwig; Dainty, A
2008-01-01
Assignments of Construction Management (CM) graduate programmes often require students to carry out research on real-world problems. To prepare students for this task, many CM-programmes contain a research methodology course. However, after taking part in these courses, many students still lack the
Ontologies to Support RFID-Based Link between Virtual Models and Construction Components
DEFF Research Database (Denmark)
Sørensen, Kristian Birch; Christiansson, Per; Svidt, Kjeld
2010-01-01
the virtual models and the physical components in the construction process can improve the information handling and sharing in construction and building operation management. Such a link can be created by means of Radio Frequency Identification (RFID) technology. Ontologies play an important role...
2011-11-10
...] Electrical Standards for Construction and General Industry; Extension of the Office of Management and Budget... contained in the Electrical Standards for Construction (29 CFR part 1926, Subpart K) and for General... maintenance of electric utilization equipment that prevent death and serious injuries among construction and...
New public management based on rankings: From plann ing to evaluation
Directory of Open Access Journals (Sweden)
Andrés Valdez Zepeda
2017-11-01
Full Text Available This article focuses on the emergence and development of a new trend of public affairs and global government management known as ranking-based management. This type of management process is the result of performance measurement usually conducted by an external agent or prestigious institution, which generally uses a methodology based on indicators and audits. It also evaluates the results, achievements and progress in governance, which it ranks on a list on which they are compared against other comparable governments. As a global trend, supported by management rankings this process is not seen as an option, but as a real requirement for public agencies and government, which not only helps them in the process of continuous improvement, but also creates important incentives such as prestige, social recognition, construction and better branding.
Real-Time Management of Groundwater Resources Based on Wireless Sensors Networks
Directory of Open Access Journals (Sweden)
Qingguo Zhou
2018-01-01
Full Text Available Groundwater plays a vital role in the arid inland river basins, in which the groundwater management is critical to the sustainable development of area economy and ecology. Traditional sustainable management approaches are to analyze different scenarios subject to assumptions or to construct simulation–optimization models to obtain optimal strategy. However, groundwater system is time-varying due to exogenous inputs. In this sense, the groundwater management based on static data is relatively outdated. As part of the Heihe River Basin (HRB, which is a typical arid river basin in Northwestern China, the Daman irrigation district was selected as the study area in this paper. First, a simulation–optimization model was constructed to optimize the pumping rates of the study area according to the groundwater level constraints. Three different groundwater level constraints were assigned to explore sustainable strategies for groundwater resources. The results indicated that the simulation–optimization model was capable of identifying the optimal pumping yields and satisfy the given constraints. Second, the simulation–optimization model was integrated with wireless sensors network (WSN technology to provide real-time features for the management. The results showed time-varying feature for the groundwater management, which was capable of updating observations, constraints, and decision variables in real time. Furthermore, a web-based platform was developed to facilitate the decision-making process. This study combined simulation and optimization model with WSN techniques and meanwhile attempted to real-time monitor and manage the scarce groundwater resource, which could be used to support the decision-making related to sustainable management.
Project management in fossil plant construction: A perspective for the Nineties
International Nuclear Information System (INIS)
Bhatia, N.K.
1991-01-01
The continuing growth in demand for electric power, and the reluctance of electric utility management to commit to new capacity additions has created a potential for somewhat hectic activity in the fossil power plant construction market. With the changing matrix of power plant types and ownerships, the project manager is called upon to deliver a complex product with exacting contract requirements: lump sum contracts, competitive pricing, short schedules, and performance guarantees. A shortage of experienced professionals in the ranks of the owners, engineers, contractors, and suppliers magnifies the challenge. Plant replication, automation, creative management of vendors and contractors, and participative management of the work force will be key elements of successful projects. Partnering between the clients and the engineers-constructors will be an interesting new relationship model
Egmond - de Wilde De Ligny, van E.L.C.; Erkelens, P.A.; Jonge, de S.; Vliet, van A.A.M.
2000-01-01
This paper describes the results of the application of a methodology to support resource management for the enhancement of sustainability in the construction industry. Particular emphasis is given to the sustainability of manufacturing and application of construction systems for low income housing
Approach to Organizational Structure Modelling in Construction Companies
Directory of Open Access Journals (Sweden)
Ilin Igor V.
2016-01-01
Full Text Available Effective management system is one of the key factors of business success nowadays. Construction companies usually have a portfolio of independent projects running at the same time. Thus it is reasonable to take into account project orientation of such kind of business while designing the construction companies’ management system, which main components are business process system and organizational structure. The paper describes the management structure designing approach, based on the project-oriented nature of the construction projects, and propose a model of the organizational structure for the construction company. Application of the proposed approach will enable to assign responsibilities within the organizational structure in construction projects effectively and thus to shorten the time for projects allocation and to provide its smoother running. The practical case of using the approach also provided in the paper.
Directory of Open Access Journals (Sweden)
Spillane, John P
2011-12-01
Full Text Available The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.
Maria L. Sonett
1999-01-01
Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...
Use of the "dual construct" for the management of complex spinal reconstructions.
Shen, Francis H; Qureshi, Rabia; Tyger, Rose; Lehman, Rebecca; Singla, Anuj; Shimer, Adam; Hassanzadeh, Hamid
2018-03-01
Surgical management of complex spinal reconstructions remains a clinical challenge, as pseudoarthrosis with subsequent rod breakage can occur. Increased rod density in the form of "satellite" or "outrigger" rods have been described; however, rod-fracture above or below satellite rods persist and can result in dissociation of the construct, loss of correction, and recurrence of deformity. The use of four distinct and mechanically independent rods (dual construct) reduces this concern. Since the original case description in 2006, there have been no other studies that use the dual construct for the surgical management of complex spinal reconstructions. The purpose of this study is to review the long-term experience and surgical technique using the dual construct, and to present our complications, rod fracture rates, and outcomes for the surgical management of complex spinal reconstructions. This study used a surgical technique with case series outcomes. Patients were from a single-institute who underwent dual construct between 2010 and 2014 and who were available for 2-year follow-up. Radiographic and functional outcomes, complications, rod fracture rates, and revision surgery rates were the outcome measures. A retrospective review was conducted from a single institution between 2010 and 2014, with a subsequent 2-year follow-up period. Extensive review of patients' medical record, radiographs, and advanced imaging where available was performed. Medical record was evaluated for patient demographics, surgical procedure, and complications. Radiographic measurements included presence or absence of implant failure and proximal junctional kyphosis or distal junctional kyphosis. A total of 36 patients underwent surgical reconstruction. The average estimated blood loss was 1,856 cc (range, 400-4,000 cc). The average length of stay was 7.3 days (range, 4-22 days). Clinical follow-up reported 21 patients (58.3%) with no or minimal pain. There were six deaths during the
Review of Solid Waste Management Practice, Handling and Planning in the Construction Industry
Directory of Open Access Journals (Sweden)
Fiza Mohd Noh
2017-11-01
Full Text Available The building and construction industry is a major contributor to the source of national economy. However, inappropriate construction waste management lead to various problems such as illegal dumping along the roadsides, demolition waste and disposal of construction at landfills that Malaysia is facing serious shortage of landfill space and recently the issue has become more serious throughout the country, which these have caused major government sources and environmental issue. Solid waste management is one of the environmental issues which always been a concerned to most governments. In urban areas, 46% of the population in the statistics that shows the world population has reached six billion. In 1997, generation of the municipal solid waste was about 0.49 billion tons around the globe with an estimated annual growth rate of 3.2-4.5% in develop nations and 2-3% in developing countries. The characteristics of solid waste generated were changed due to the rapid urbanization and industrialization.
Gao, Xing; He, Yao; Hu, Hongpu
2017-01-01
Allowing for the differences in economy development, informatization degree and characteristic of population served and so on among different community health service organizations, community health service precision fund appropriation system based on performance management is designed, which can provide support for the government to appropriate financial funds scientifically and rationally for primary care. The system has the characteristic of flexibility and practicability, in which there are five subsystems including data acquisition, parameter setting, fund appropriation, statistical analysis system and user management.
Directory of Open Access Journals (Sweden)
Ali Asghar Najafpoor
2014-09-01
Full Text Available Background and purpose: In a recent century, the amount of construction waste has increased significantly. Although the building industry has a considerable role in the development of a society, it is regarded as an environmentally destructive. Source reduction is the highest goal in the waste management hierarchy and is in priority. It also has economic benefits by reducing costs associated with transportation, disposal or recycling of wastes. The present study is aimed to identify activities generating the wastes in design, transportation and storage and procurement of building materials. Materials and Methods: This was questionnaire survey. A total of 94 professionals in the construction industry were attended in this study. To determine the validity and reliability of the instrument, content validity method and Cronbach’s alpha coefficient (0.79 were used. Data were analyzed using SPSS for Windows. Frequencies, percentage, mean and standard deviation were determined in this research. Results: The results showed that handling and storage have been chosen as the most causative factor of waste production in construction activity. Improper material storage was identified major factor in producing waste in handling and storage phase. Usage of low-quality material in design stage and material price changes in procurement were recognized as major causes of waste production in these stages. Conclusion: All studied phases in this research were identified as causative factors in producing of waste. Identifying causes of construction waste production will help us decide better how to control this sort of wastes.
Assessing problem-solving skills in construction education with the virtual construction simulator
Castronovo, Fadi
The ability to solve complex problems is an essential skill that a construction and project manager must possess when entering the architectural, engineering, and construction industry. Such ability requires a mixture of problem-solving skills, ranging from lower to higher order thinking skills, composed of cognitive and metacognitive processes. These skills include the ability to develop and evaluate construction plans and manage the execution of such plans. However, in a typical construction program, introducing students to such complex problems can be a challenge, and most commonly the learner is presented with only part of a complex problem. To support this challenge, the traditional methodology of delivering design, engineering, and construction instruction has been going through a technological revolution, due to the rise of computer-based technology. For example, in construction classrooms, and other disciplines, simulations and educational games are being utilized to support the development of problem-solving skills. Previous engineering education research has illustrated the high potential that simulations and educational games have in engaging in lower and higher order thinking skills. Such research illustrated their capacity to support the development of problem-solving skills. This research presents evidence supporting the theory that educational simulation games can help with the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems. The educational simulation game employed in this study is the Virtual Construction Simulator (VCS). The VCS is a game developed to provide students in an engaging learning activity that simulates the planning and managing phases of a construction project. Assessment of the third iteration of the VCS(3) game has shown pedagogical value in promoting students' motivation and a basic understanding of construction concepts. To further evaluate the benefits on
Use of communication technologies in document exchange for the management of construction projects
Directory of Open Access Journals (Sweden)
Mesároš Peter
2016-06-01
Full Text Available Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.
Use of communication technologies in document exchange for the management of construction projects
Mesároš, Peter; Mandičák, Tomáš
2016-06-01
Information and communication technologies represent a set of people, processes, technical and software tools providing collection, transport, storage and processing of data for distribution and presentation of information. Particularly communication systems are the main tool for information exchange. Of the other part, these technologies have a broad focus and use. One of them is the exchange of documents in the management of construction projects. Paper discusses the issue of exploitation level of communication technologies in construction project management. The main objective of this paper is to analyze exploitation level of communication technologies. Another aim of the paper is to compare exploitation level or rate of document exchange by electronic communication devices and face-to-face communication.
International Nuclear Information System (INIS)
Wu Kaiping
2014-01-01
The construction of experience feedback system is an important part and breakthrough point of institutes' knowledge management. It is significant for institutes' design, management, development and innovation. This article introduces the concept of experience feedback for institutes. It also goes details of the content of experience feedback system construction for institutes, including the founding of experience feedback organizational mechanism, the development of experience feedback system, construction of knowledge database system, the construction of knowledge resources, and the appraisal of experience feedback's performance. Furthermore, the recognition and support of leaders, understanding and cooperation of relative departments, and corporation's culture of encouraging knowledge sharing, also are the important guarantees for the good effects of institutes' experience feedback work. (author)
Evidence-based management - healthcare manager viewpoints.
Janati, Ali; Hasanpoor, Edris; Hajebrahimi, Sakineh; Sadeghi-Bazargani, Homayoun
2018-06-11
Purpose Hospital manager decisions can have a significant impact on service effectiveness and hospital success, so using an evidence-based approach can improve hospital management. The purpose of this paper is to identify evidence-based management (EBMgt) components and challenges. Consequently, the authors provide an improving evidence-based decision-making framework. Design/methodology/approach A total of 45 semi-structured interviews were conducted in 2016. The authors also established three focus group discussions with health service managers. Data analysis followed deductive qualitative analysis guidelines. Findings Four basic themes emerged from the interviews, including EBMgt evidence sources (including sub-themes: scientific and research evidence, facts and information, political-social development plans, managers' professional expertise and ethical-moral evidence); predictors (sub-themes: stakeholder values and expectations, functional behavior, knowledge, key competencies and skill, evidence sources, evidence levels, uses and benefits and government programs); EBMgt barriers (sub-themes: managers' personal characteristics, decision-making environment, training and research system and organizational issues); and evidence-based hospital management processes (sub-themes: asking, acquiring, appraising, aggregating, applying and assessing). Originality/value Findings suggest that most participants have positive EBMgt attitudes. A full evidence-based hospital manager is a person who uses all evidence sources in a six-step decision-making process. EBMgt frameworks are a good tool to manage healthcare organizations. The authors found factors affecting hospital EBMgt and identified six evidence sources that healthcare managers can use in evidence-based decision-making processes.
2010-09-30
...] Concrete and Masonry Construction; Extension of the Office of Management and Budget's (OMB) Approval of... requirements specified in the Standard on Concrete and Masonry Construction (29 CFR part 1926, subpart Q..., screens or pumps used for concrete and masonry construction) specified by paragraphs 1926.702(a)(2), (j)(1...
Leong, Tiong Kung; Ariff, Mohd. Shoki Md.
2014-01-01
This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings. PMID:24701182
Directory of Open Access Journals (Sweden)
Tiong Kung Leong
2014-01-01
Full Text Available This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.
Leong, Tiong Kung; Zakuan, Norhayati; Mat Saman, Muhamad Zameri; Ariff, Mohd Shoki Md; Tan, Choy Soon
2014-01-01
This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.
Fluid management in the optimization of space construction
Snyder, Howard
1990-01-01
Fluid management impacts strongly on the optimization of space construction. Large quantities of liquids are needed for propellants and life support. The mass of propellant liquids is comparable to that required for the structures. There may be a strong dynamic interaction between the stored liquids and the space structure unless the design minimizes the interaction. The constraints of cost and time required optimization of the supply/resupply strategy. The proper selection and design of the fluid management methods for: slosh control; stratification control; acquisition; transfer; gauging; venting; dumping; contamination control; selection of tank configuration and size; the storage state and the control system can improve the entire system performance substantially. Our effort consists of building mathematical/computer models of the various fluid management methods and testing them against the available experimental data. The results of the models are used as inputs to the system operations studies. During the past year, the emphasis has been on modeling: the transfer of cryogens; sloshing and the storage configuration. The work has been intermeshed with ongoing NASA design and development studies to leverage the funds provided by the Center.
Zhao-Hui, Zheng; Jun, Qin; Li, Chen; Hong, Zhu; Li, Tang; Zu-Wu, Tu; Ming-Xing, Zeng; Qian, Sun; Shun-Xiang, Cai
2016-10-09
To analyze the construction and operation status of management system of laboratories of schistosomiasis control institutions in Hubei Province, so as to provide the reference for the standardized detection and management of schistosomiasis laboratories. According to the laboratory standard of schistosomiasis at provincial, municipal and county levels, the management system construction and operation status of 60 schistosomiasis control institutions was assessed by the acceptance examination method from 2013 to 2015. The management system was already occupied over all the laboratories of schistosomiasis control institutions and was officially running. There were 588 non-conformities and the inconsistency rate was 19.60%. The non-conformity rate of the management system of laboratory quality control was 38.10% (224 cases) and the non-conformity rate of requirements of instrument and equipment was 23.81% (140 cases). The management system has played an important role in the standardized management of schistosomiasis laboratories.
Project risk management in the construction of high-rise buildings
Titarenko, Boris; Hasnaoui, Amir; Titarenko, Roman; Buzuk, Liliya
2018-03-01
This paper shows the project risk management methods, which allow to better identify risks in the construction of high-rise buildings and to manage them throughout the life cycle of the project. One of the project risk management processes is a quantitative analysis of risks. The quantitative analysis usually includes the assessment of the potential impact of project risks and their probabilities. This paper shows the most popular methods of risk probability assessment and tries to indicate the advantages of the robust approach over the traditional methods. Within the framework of the project risk management model a robust approach of P. Huber is applied and expanded for the tasks of regression analysis of project data. The suggested algorithms used to assess the parameters in statistical models allow to obtain reliable estimates. A review of the theoretical problems of the development of robust models built on the methodology of the minimax estimates was done and the algorithm for the situation of asymmetric "contamination" was developed.
Mathematical Methods of Managing Economic Sustainability of the Construction Company
Kostuchenko, Vasiliy; Zdanov, Andrej; Rodionov, Anatolij
2017-10-01
This article presents a long-term research in developing innovative mathematical techniques of managing the contractor’s economic sustainability proven by some experimental studies. The article aims at presenting some practical results of applying these techniques to the scientific community. This research presents a description of some applied mathematical models, views, and some results of their practical application in the applied field for the purposes of evaluating operational sustainability and minimizing losses in the process of managing the company. The authors have put the technology they have developed to practical use, and the article presents the results of such application. The authors have put the developed technology to practical use. Company management also means the management of power consumption, which is highly vital both for the construction and maintenance of buildings and structures. The articles also dwell on some possible improvements of managing energy consumption within the framework of the general management of company’s economic sustainability, because these phenomena have a tight organic interdependence. The authors continue researching this direction in order to improve the production efficiency of the proposed technologies as well as to eliminate some drawbacks they have spotted.
Gestalteconomy: The economic bases of knowledge management
International Nuclear Information System (INIS)
Maisseu, A.
2006-01-01
Conventional economic analyses are based on dogmas that are frequently out of phase with reality. It is thus very difficult to introduce technology, technological innovation and technical progress correctly into all the theoretical constructions derived from the application of these principles. The same applies to the consideration of pollution and the depletion of natural resources. These difficult problems, which bedevil the definition of a sustainable development, find no satisfactory answer in these theoretical considerations. The consideration of Gestalteconomy helps to resolve these difficulties, in opening the door to the entrepreneurial practical management of knowledge. (author)
Directory of Open Access Journals (Sweden)
Janackovic, Goran Lj.
2013-11-01
Full Text Available This paper presents the factors, performance, and indicators of occupational safety, as well as a method to select and rank occupational safety indicators based on the expert evaluation method and the fuzzy analytic hierarchy process (fuzzy AHP. A case study is done on road construction companies in Serbia. The key safety performance indicators for the road construction industry are identified and ranked according to the results of a survey that included experts who assessed occupational safety risks in these companies. The case study confirmed that organisational factors have a dominant effect on the quality of the occupational health and safety management system in Serbian road construction companies.
Enhanced On-Site Waste Management of Plasterboard in Construction Works: A Case Study in Spain
Directory of Open Access Journals (Sweden)
Ana Jiménez-Rivero
2017-03-01
Full Text Available On-site management of construction waste commonly determines its destination. In the case of plasterboard (PB, on-site segregation becomes crucial for closed-loop recycling. However, PB is commonly mixed with other wastes in Spain. In this context, the involvement of stakeholders that can contribute to reversing this current situation is needed. This paper analyzes on-site waste management of PB in Spain through a pilot study of a construction site, with the main objective of identifying best practices to increase waste prevention, waste minimization, and the recyclability of the waste. On-site visits and structured interviews were conducted. The results show five management stages: PB distribution (I; PB installation (II; Construction waste storage at the installation area (III; PB waste segregation at the installation area (IV and PB waste transfer to the PB container and storage (V. The proposed practices refer to each stage and include the merging of Stages III and IV. This measure would avoid the mixing of waste fractions in Stage III, maximizing the recyclability of PB. In addition, two requisites for achieving enhanced management are analyzed: ‘Training and commitment’ and ‘fulfilling the requirements established by the current regulation’. The results show that foremen adopted a more pessimistic attitude than installers towards a joint commitment for waste management. Moreover, not all supervisors valued the importance of a site waste management plan, regulated by the Royal Decree 105/2008 in Spain.
Construction labor productivity during nuclear power plant construction
International Nuclear Information System (INIS)
Murray, W.B.
1980-01-01
This paper discusses the three different types of productivity programs used at the Wm. H. Zimmer Nuclear Power Station construction site. The Standard Cost Estimate as Productivity Measurement compares actual units installed to estimated units. The Manpower and Equipment Utilization Study measures the present utilization level of the construction work force, identifies opportunities for productivity improvement, and establishes a data base against which future improvements could be made. The special productivity program is a specialized and detailed study of first line supervision. Productivity is defined as the degree of efficiency attained in the use of labor, professional and management skills and knowledge, materials and equipment, and time and money to produce an end result. It is concluded that a more consistent system of productivity measurements needs to be developed and promoted for general use in the construction industry
Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay
2018-03-01
The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.
Nuclear power project construction quality acceptance standards Implementation and discussion
International Nuclear Information System (INIS)
Lai Shifu
2013-01-01
Project quality construction acceptance is an important element of nuclear power project quality management. Based on characteristics of NPP construction and refer to national construction quality acceptance code and industry regulation, this paper introduces and discusses NPP construction quality acceptance regulation improvement and implementation under current situation. (authors)
NEW INSTRUMENTS FOR MANAGEMENT OF CONSTRUCTION PROGRAMS AND PROJECTS IN THE NEW ECONOMY STRUCTURE
Directory of Open Access Journals (Sweden)
Silka Dmitriy Nikolaevich
2017-11-01
Full Text Available Subject: the new economy structure is directly related to the active application of digital technologies. Economic processes are more formalized and for making administrative decisions it becomes possible to operate in a greater degree with precise criteria and information than probabilistic assumptions. As a subject of research, new tools for managing construction programs and projects are presented. Research objectives: the purpose of the study is to formulate general principles and directions for the digitization of economic relations in investment and construction activities to ensure the effectiveness of implementation of new generation projects. Materials and methods: to achieve the goal, the article shows the composition of state programs and projects in the construction sector and the system problems of their implementation. Organizational methods of increasing their effectiveness are considered. Results: the most promising areas of implementation of new management tools for investment and construction programs and projects are identified. Conclusions: the article shows the current dynamics of changes in technical and socio-economic systems at the level of construction sector. It is pointed out that the tasks of socio-economic nature require the development of unique approaches since the peculiarities of Russian legislation, of the prevailing norms and rules of economic activity prevent the direct replication of successful foreign experience.
The effect of Problem/Project-Based Learning on a desired skill set for construction professionals
Sirotiak, Todd L.
The purpose of this study was to investigate if a Problem/Project-Based Learning (PBL) approach can affect certain non-technical, "soft" skills of construction engineers. Such skills include leadership, adaptability, and stress management. In mixed design research, quantitative and qualitative data are assembled and analyzed collectively. For this study, two separate assessment tools were used for the quantitative portion, while open-ended written reflections and a partially closed-ended senior questionnaire were implemented for the qualitative portion. A hypothetical model was used to investigate certain soft skills based on prior research documenting need. Skills investigated were confidence, stress coping, leadership, communication skills, adaptability, and management skills. Descriptive statistics, open-ended final written reflections, and a partially closed-ended senior questionnaire were used to analyze the data. PBL is a process in which the students are challenged to develop realistic solutions on open, less structured, real world type problems. The results of this study performed with the combined count of nearly 60 students suggest that PBL can influence several soft skills of senior construction engineers. Specifically, these findings demonstrate the following: (a) PBL appears to affect students' soft skills; (b) students appear to recognize the realism and "real world" applicability that PBL brings to their skill development; and (c) the data suggest that the experience is holistic and offers opportunities for balanced growth in several ways. Some key competencies such as communication and leadership indicated significant enhancements. Although this study was limited to one academic year of the university's construction engineering program, it provides interesting insight to changes within the time period investigated. This study should be replicated in other construction engineering environments to investigate a larger population sample. In addition
Constraints to 3R construction waste reduction among contractors in Penang
Ng, L. S.; Tan, L. W.; Seow, T. W.
2018-04-01
Rapid development of construction industry increases construction waste on landfill leading to shorter life span of the landfill. Waste reduction through Reduce, Reuse and Recycle (3R) practice has been encouraged in construction industry towards sustainable waste management since couple of decades ago. However, waste reduction through 3R is still at its infancy in construction industry in Penang, Malaysia. The aim of this paper is to determinate the constraints to construction waste reduction through 3R among contractors in Penang. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 based in Penang, experts from Penang Local Authority, CIDB in Penang and its headquarters, National Solid Waste Management Department, and headquarters of Solid Waste and Public Cleansing Management Corporation (SWCorp). Based on interviews and questionnaire surveys, constraints identified are Time and cost, Contractor’s attitude and low participation, Lack of enforcement law and regulation, Lack of awareness and knowledge, Lack of coordination, and Lack of space. Awareness and knowledge, and enforcement law and regulation are the major barriers which influence others constraints as well. Therefore, these constraints should be emphasized by the authorities in order to improve the implementation of 3R construction waste reduction.
Hanford ground-water data base management guide and user's manual
International Nuclear Information System (INIS)
Mitchell, P.J.; Argo, R.S.; Bradymire, S.L.; Newbill, C.A.
1985-05-01
This management guide and user's manual is a working document for the computerized Hanford Ground-water Data Base maintained by the Geosciences Research and Engineering Department at Pacific Northwest Laboratory for the Hanford Ground-Water Surveillance Program. The program is managed by the Occupational and Environmental Protection Department for the US Department of Energy. The data base is maintained to provide rapid access to data that are rountinely collected from ground-water monitoring wells at the Hanford site. The data include water levels, sample analyses, geologic descriptions and well construction information of over 3000 existing or destroyed wells. These data are used to monitor water quality and for the evaluation of ground-water flow and pollutant transport problems. The management guide gives instructions for maintenance of the data base on the Digital Equipment Corporation PDP 11/70 Computer using the CIRMIS (Comprehensive Information Retrieval and Model Input Sequence) data base management software developed at Pacific Northwest Laboratory. Maintenance activities include inserting, modifying and deleting data, making back-up copies of the data base, and generating tables for annual monitoring reports. The user's guide includes instructions for running programs to retrieve the data in the form of listings of graphical plots. 3 refs
Flexible selection process based on skills applied to the communication manager position
Directory of Open Access Journals (Sweden)
Rita Jácome López
2016-03-01
Full Text Available The Communication Manager position is relevant to the reputation of an organization, because it influences through its own personal image and reputation; therefore, the selection of this manager has to be painstaking. In this paper we propose a flexible selection process based on fuzzy logic, to fit the skills of candidates for the job and to support decision making. We present two techniques:one that selects the best applicant and another one that compares candidates with an ideal constructed with information provided by Spanish managers.
Kuwabara, Cleuza Catsue Takeda; Evora, Yolanda Dora Martinez; de Oliveira, Márcio Mattos Borges
2010-01-01
With the continuous incorporation of health technologies, hospital risk management should be implemented to systemize the monitoring of adverse effects, performing actions to control and eliminate their damage. As part of these actions, Technovigilance is active in the procedures of acquisition, use and quality control of health products and equipment. This study aimed to construct and validate an instrument to evaluate medical-hospital products. This is a quantitative, exploratory, longitudinal and methodological development study, based on the Six Sigma quality management model, which has as its principle basis the component stages of the DMAIC Cycle. For data collection and content validation, the Delphi technique was used with professionals from the Brazilian Sentinel Hospital Network. It was concluded that the instrument developed permitted the evaluation of the product, differentiating between the results of the tested brands, in line with the initial study goal of qualifying the evaluations performed.
Women Leaders' Construction of Leadership and Management of the Academic Department
Zulu, C. B.
2011-01-01
Research on women in leadership has received growing attention in recent years. But not enough studies have investigated the way women construct leadership and management of the academic department. This article reports on the findings of an inquiry into the experiences of women heads of academic departments (HoDs) at universities in South Africa…
The use of Game Theory to solve conflicts in the project management and construction industry
Directory of Open Access Journals (Sweden)
José Ramón San Cristóbal
2015-01-01
Full Text Available A typical construction project involves a wide range of disparate professionals, in many cases geographically distributed, working together for a relatively short period of time on the design and construction of a facility. Since organizations are becoming flatter, culturally rich, geographically diverse and intensely competitive, the possibilities for conflict in such environments are greater. Negotiation is an important aspect of a project and plays an important role in resolving claims, preventing disputes, and keeping a harmonious relationship between project participants. Part of any project manager’s role as a leader is to recognize conflict, understand the sources of conflict and manage it, and to do this a project manager must be able to understand the basics of negotiation theory and have sufficient competencies to lead in such situations. To address the complex technical and human issues in negotiation, different negotiation theories and models are available which mainly include game theory, economic theory, and behavior theory. Since Game Theory provides, by its very nature, the appropriate tools for the analysis and eventual solution of conflicts of any kind, this paper uses a model based on Game Theory in order to identify the activities that are responsible for the delays in a project and divide the costs among them.
DEFF Research Database (Denmark)
Vogelius, Peter; Storgaard, Kresten
2016-01-01
The study presents a building project executed by a major Danish construction company, where cooperation and its staging were essential for achieving high productivity and competitiveness. The form of this cooperation is the main theme for the article. The contractor actively changed the communic......The study presents a building project executed by a major Danish construction company, where cooperation and its staging were essential for achieving high productivity and competitiveness. The form of this cooperation is the main theme for the article. The contractor actively changed...... the companies in the case can be understood as possessing a social capital which is enforced and united by initiatives of the main contractor. The social capital was built up and maintained through the actual constitution of cooperation already in the initial phase of bidding before the building process....... The management logic of the main contractor is interpreted as based on a sociology-inspired understanding focusing on norms and social values rather than on contractual (law) and functional (engineering) logic, which had hitherto been prevalent in Danish construction management....
Construction Worker Fatigue Prediction Model Based on System Dynamic
Wahyu Adi Tri Joko; Ayu Ratnawinanda Lila
2017-01-01
Construction accident can be caused by internal and external factors such as worker fatigue and unsafe project environment. Tight schedule of construction project forcing construction worker to work overtime in long period. This situation leads to worker fatigue. This paper proposes a model to predict construction worker fatigue based on system dynamic (SD). System dynamic is used to represent correlation among internal and external factors and to simulate level of worker fatigue. To validate...
Directory of Open Access Journals (Sweden)
Lidia Sanchez-Ruiz
2016-12-01
Full Text Available Construct design and validation is a common practise in the Operations Management field. In this sense, the aim of this study is to present Rasch Measurement Theory (RMT as richful and useful methodology in order to validate constructs. In order to do so, the measurement controversy in the social science is presented; then, RMT is explained as a solution for this measurement issue; after that, the different applications of RMT are described and, finally, the different stages of the validation process are presented. Thus, this work aims to serve as a guide for those researchers interested in the methodology. Therefore, a specific case is included: the validation of the construct “motivation to implement continuous improvement”.
Study Of Safety Management By Using Gis In Coimbatore
Directory of Open Access Journals (Sweden)
S. Kanchana
2015-08-01
Full Text Available The safety management is very important in the process of construction .The traditional methods of construction safety control cannot meet the construction of big project. To ensure the safety of construction and reduce accidents in the process of construction the current situation and problems we face in construction safety management should be studied first. And then the project risk warning mechanism based on the GIS is constructed according to the problems we faced to achieve visual monitoring and warning of construction safety risk management and to provide decision support for construction. This project aims to develop a web-based spatial decision support system model for proactive health and safety management in linear construction projects. 5 Currently health and safety management is usually performed reactively instead of proactive management since hazard identification and risk assessment is mostly performed on paper based documents that are not effectively used at site. An information system relates to a chain of operations lead to planning the observation and collection of data to storage and analysis of data to the use of derived information in decision-making processes. To create a web-based free and open sourced GIS that can work with different data formats by exchanging and presenting data as a real-time map on web.
Design of material management system of mining group based on Hadoop
Xia, Zhiyuan; Tan, Zhuoying; Qi, Kuan; Li, Wen
2018-01-01
Under the background of persistent slowdown in mining market at present, improving the management level in mining group has become the key link to improve the economic benefit of the mine. According to the practical material management in mining group, three core components of Hadoop are applied: distributed file system HDFS, distributed computing framework Map/Reduce and distributed database HBase. Material management system of mining group based on Hadoop is constructed with the three core components of Hadoop and SSH framework technology. This system was found to strengthen collaboration between mining group and affiliated companies, and then the problems such as inefficient management, server pressure, hardware equipment performance deficiencies that exist in traditional mining material-management system are solved, and then mining group materials management is optimized, the cost of mining management is saved, the enterprise profit is increased.
Shazwan, M. A.; Quintin, J. V.; Osman, N. A.; Suhaida, S. K.; Ma'arof, M. I. N.
2017-11-01
Construction site’s cleanliness and tidiness is one of top main concerns of construction site management. A good site management with adequate planning in regards to housekeeping will ensure safety to both the site’s working personnel and the neighbouring environment. This is especially of priority today due to the rapid growth of construction projects in Malaysia. Nevertheless, to date, statistics had shown that housekeeping related accidents happened repeatedly despite the awareness on site’s cleanliness and tidiness. The objective of this study was to explore constructor’s perspective on site cleanliness and tidiness. A set of questionnaire was distributed to thirty-four (34) Grade 7 CIDB contractors’ firms in Petaling Jaya. Petaling Jaya was chosen since this area are developed area covered with residential area and cleaning management an importance issues. The goals of the survey study were to identify the following items from the perception of the contractors: (i) the hierarchy of importance of several purposes in ensuring construction site’s cleanliness and tidiness, and (ii) the risk factors that influence a construction site’s level of cleanliness and tidiness. It was found that from the contractor’s perspective, ensuring a site cleanliness and tidiness is of importance mainly due to the need in protecting the environment, whilst, the least in cost saving. In addition, poor personnel’s working attitude was found to be the main risk factor that will influences a construction site’s level of cleanliness and tidiness. Conclusively, construction site’s cleanliness and tidiness is highly vital. Even so, for nationwide awareness on the topic matter will requires full cooperation from all related parties.
The Role Played by Agricultural Policy-based Finance in New Village Construction
Institute of Scientific and Technical Information of China (English)
2011-01-01
The necessity of the agricultural policy-based finance in terms of supporting the new village construction is analyzed: in the first place, the theoretical roots of agricultural policy-based finance supporting new village construction are "market failure" and "government intervention"; in the second place, the continual decline of agriculture and the "rural financial market failure" in recent years have become the objective evidence and historical mission for agricultural policy-based finance to support new village construction; in the third place, the combination of agricultural policy-based finance and new village construction is conducive to solving the "three agriculture" problems and facilitating the reform of new village construction. The feasibility of the support is analyzed: firstly, agricultural policy-based finance boasts the status and position of the "primary drive" in new village construction; secondly, the nation continuously deepens the reform of rural financial system and policy-based banks and strengthens the functions of Agricultural Development Bank, which provides policies for agricultural policy-based finance to support new village construction; thirdly, the 14 years’ reform and development of Agricultural Development Bank and the eleventh five year plan lay sound practical basis for the support of agricultural policy-based finance to new village construction. Based on the necessity and feasibility, the following six aspects are analyzed to fully display the function of the "first engine" of agricultural policy-related finance to new village construction. Firstly, strengthening the credit and loan aid to grain and cotton and some other agricultural products in the circulation domain; secondly, strengthening the credit and loan aid to agricultural industrialization in processing field; thirdly, intensifying the credit and loan aid to agricultural comprehensive development, rural infrastructure construction, application and promotion of
Japanese experience in nuclear power plant construction
International Nuclear Information System (INIS)
Seko, T.
1989-01-01
Development of LWR in JAPAN started by introducing LWR from the U.S.A. Since then we have been improving existing technology and promoting domestic technology development based on experiences accumulated in Japan. As a result, recent operating performance has been excellent. As far as construction work is concerned, we also have been making our best efforts to improve the performance of construction work itself, with the cooperation of manufacturers. As for construction work, we have succeeded in improving the quality of construction work, shortening the construction period and reducing construction costs through new technology and Japanese-style work management
A full life cycle nuclear knowledge management framework based on digital system
International Nuclear Information System (INIS)
Wang, Minglu; Zheng, Mingguang; Tian, Lin; Qiu, Zhongming; Li, Xiaoyan
2017-01-01
Highlights: • A full life cycle nuclear power plant knowledge management framework is introduced. • This framework benefits the safe design, construction, operation and maintenance. • This framework enhances safety, economy and reliability of nuclear power plant. - Abstract: The nuclear power plant is highly knowledge-intensive facility. With the rapid advent and development of modern information and communication technology, knowledge management in nuclear industry has been provided with new approaches and possibilities. This paper introduces a full cycle nuclear power plant knowledge management framework based on digital system and tries to find solutions to knowledge creation, sharing, transfer, application and further innovation in nuclear industry. This framework utilizes information and digital technology to build top-tier object driven work environment, automatic design and analysis integration platform, digital dynamic performance Verification & Validation (V&V) platform, collaborative manufacture procedure, digital construction platform, online monitoring and configuration management which benefit knowledge management in NPP full life cycle. The suggested framework will strengthen the design basis of the nuclear power plants (NPPs) and will ensure the safety of the NPP design throughout the whole lifetime of the plant.
Group Selection and Learning for a Lab-Based Construction Management Course
Solanki, Pranshoo; Kothari, Nidhi
2014-01-01
In construction industries' projects, working in groups is a normal practice. Group work in a classroom is defined as students working collaboratively in a group so that everyone can participate on a collective task. The results from literature review indicate that group work is more effective method of learning as compared to individual work.…
Constructive Classroom Management.
Dollard, Norin; And Others
1996-01-01
Reviews classroom management strategies that are child-centered and consistent with constructivist approaches to education, in which teachers create situations that facilitate learning. Describes strategies including techniques for establishing dialog, cognitive interventions (including self management and conflict resolution), cognitive…
Construction project investment control model based on instant information
Institute of Scientific and Technical Information of China (English)
WANG Xue-tong
2006-01-01
Change of construction conditions always influences project investment by causing the loss of construction work time and extending the duration. To resolve such problem as difficult dynamic control in work construction plan, this article presents a concept of instant optimization by ways of adjustment operation time of each working procedure to minimize investment change. Based on this concept, its mathematical model is established and a strict mathematical justification is performed. An instant optimization model takes advantage of instant information in the construction process to duly complete adjustment of construction; thus we maximize cost efficiency of project investment.
Construction Tender Subcontract Selection using Case-based Reasoning
Directory of Open Access Journals (Sweden)
Due Luu
2012-11-01
Full Text Available Obtaining competitive quotations from suitably qualified subcontractors at tender tim n significantly increase the chance of w1nmng a construction project. Amidst an increasingly growing trend to subcontracting in Australia, selecting appropriate subcontractors for a construction project can be a daunting task requiring the analysis of complex and dynamic criteria such as past performance, suitable experience, track record of competitive pricing, financial stability and so on. Subcontractor selection is plagued with uncertainty and vagueness and these conditions are difficul_t o represent in generalised sets of rules. DeciSIOns pertaining to the selection of subcontr:act?s tender time are usually based on the mtu1t1onand past experience of construction estimators. Case-based reasoning (CBR may be an appropriate method of addressing the chal_lenges of selecting subcontractors because CBR 1s able to harness the experiential knowledge of practitioners. This paper reviews the practicality and suitability of a CBR approach for subcontractor tender selection through the development of a prototype CBR procurement advisory system. In this system, subcontractor selection cases are represented by a set of attributes elicited from experienced construction estimators. The results indicate that CBR can enhance the appropriateness of the selection of subcontractors for construction projects.
Shortcomings of the IQ-Based Construct of Underachievement
Ziegler, Albert; Ziegler, Albert; Stoeger, Heidrun
2012-01-01
Despite being plagued by serious conceptual problems, underachievement ranks among the most popular constructs in research on the gifted. Many of its problems have their roots in the use of the IQ as the supposedly best method of measuring ability levels. Only a few decades ago the opinion was still widespread that the IQ-based construct of…
Directory of Open Access Journals (Sweden)
Faisal Manzoor Arain
2009-11-01
Full Text Available Construction law is a vital component of the body of knowledge that is needed by construction professionals in order to successfully operate in the commercial world of construction. Construction law plays an important role in shaping building projects. Construction projects are complex because they involve many human and non-human factors and variables. Teaching construction law is therefore a complex issue with several dimensions. In recent years, Information Technology (IT has become strongly established as a supporting tool for many professions, including teachers. If faculty members have a knowledge base established on similar past projects, it would assist the faculty members to present case studies and contractually based scenarios to students. This paper proposes potential utilisation of a Knowledge-based System (KBS for teaching construction law to built environment students. The KBS is primarily designed for building professionals to learn from similar past projects. The KBS is able to assist professionals by providing accurate and timelyinformation for decision making and a user-friendly tool for analysing and selecting the suggested controls for variations in educational buildings. It is recommended that the wealth of knowledge available in the KBS can be very helpful in teaching construction law to built environment students. The system presents real case studies and scenarios to students to allow them to analyse and learn construction law. The KBS could be useful to students as a general research tool because the students could populate it with their own data and use it with the reported educational projects. With further generic modifications, the KBS will also be useful for built environment students to learn about project management of building projects; thus, it will raise the overall level of professional understanding, and eventually productivity, in the construction industry.
Sustainable construction: construction and demolition waste reconsidered.
del Río Merino, Mercedes; Izquierdo Gracia, Pilar; Weis Azevedo, Isabel Salto
2010-02-01
Construction activity in Europe has increased substantially in the past decade. Likewise, there has also been a commensurate rise in the generation of construction and demolition waste (C&DW). This, together with the fact that in many European countries the rate of recycling and reuse of C&DW is still quite low has engendered a serious environmental problem and a motivation to develop strategies and management plans to solve it. Due to its composition, there is a significant potential to reuse and/or recycle C&DW, and thereby, contribute to improving the sustainability of construction and development, but practical procedures are not yet widely known or practiced in the construction industry. This article (a) summarizes the different applications that are presently practiced to optimize the recovery and/or application of C&DW for reuse, and (b) proposes various measures and strategies to improve the processing of this waste. The authors suggest that to enhance environmental effectiveness, a conscious and comprehensive C&DW management plan should be implemented in each jurisdiction. More precisely, this study presents a holistic approach towards C&DW management, through which environmental benefits can be achieved through the application of new construction methods that can contribute to sustainable growth.
Construction the organizational structure of the MTE oriented on the business-processes management
Kohut, Y.
2011-01-01
The methodical recommendations for the construction the organizational structure of the MTE oriented on the business-processes management has been developed by substantiating of basic works, maintenance, sequence and orientation, and also methods and receptions of their realization.
Comparative study of plans for integrated residue management of construction: an analysis documental
Júnior, Jorge Henrique e Silva; Vieira, Elizângela de Jesus Oliveira de Sousa; Monte, Maria José Soares; Carvalho, Moisés Lopes; Oliveira, Francílio de Carvalho; Carvalho, Jancineide Oliveira de
2013-01-01
Objective: The present study is a comparative study of integrated plans in four cities, highlighting the points that are in accordance with Resolution 307/2002 of CONAMA. Methods: This is a bibliographic and documentary research as having scientific articles sources Plans and Integrated Solid Waste Management Construction of five Brazilian cities: Curitiba, Cuiaba, Florianopolis, Rio de Janeiro and São Paulo. Results: The resolution foresees the Integrated Management of Residues Plan for Cons...
HITACHI construction CAE system
International Nuclear Information System (INIS)
Yoshida, M.
1994-01-01
Construction and maintenance of nuclear power plants have important problems such as shortening the construction period and reducing the construction cost. Recently, the problem of insufficient construction labor has arisen, and as drastic strategic development has become a necessary counter-measure. The following four principles are included in the measures to be taken for efficient execution of the construction work within the short construction period: (1) reduction of on-site work and expansion of module block making, (2)improvement of the accuracy of the on-site work process, adjustment and expansion of the work in parallel with the construction process, (3)improvement of efficiency of the on-site work and mechanization and automation of the work, (4)improvement of the accuracy of the management of the construction. A three dimensional simulation system plant construction plan CAE, comprising five modules has been developed. A project management system was also developed to improve the accuracy and efficiency of management work in the field
Culture impact in construction supply chain management
Tzortzatou, E. P.
2008-01-01
Awareness of cultural differences in construction supply chains is of fundamental importance because only through a thorough understanding of the manifestations of culture can fragmented supply chains be appropriately integrated into cohesive and collaborating teams which enhance project performance Hence the concept of cultural alignment with the project supply chain is introduced in order for long-term collaborative relationships based on trust, co ordination and mutual benefit to be establ...
Harinarain, Nishani; Haupt, Theo Conrad
2014-09-01
Different industries manage the threats presented by HIV and AIDS in different ways. The construction industry is particularly vulnerable to the pandemic because of its large unskilled labour force, high labour turnover and the migratory nature of the workforce. The study reported on in this paper, the first of its kind in the South African construction industry, aimed to identify the important drivers needed for the effective management of HIV and AIDS and to understand their impact on the construction industry. The aim was achieved in two stages. The first stage involved an extensive literature review to determine the factors that drive corporate response in the management of HIV and AIDS in the South African construction sector. Six drivers, namely legal requirements, social pressures, business costs, voluntary regulation, visibility of the disease, and individuals within companies with a total of 87 items were identified. An iterative Delphi technique with a panel of experts was used to validate the factors identified in the literature review and formed the second stage of this research. The Delphi method was used as it provided a systematic approach to achieve consensus on the six drivers for effective management of HIV and AIDS management in the construction industry. An expert panel responded to three iterations of questionnaires to achieve consensus. The experts reached consensus on 56 items categorised under the 6 drivers. This study found that the legal driver was considered most important but only second in terms of impact. The second most important driver was the visibility of the disease and was regarded as the driver with the highest impact. Internal agents ranked third in terms of importance and impact. This study can be used for further research to assist the construction industry in helping fight HIV and AIDS.
The Strategy of Management Тraining in the Construction Engineering
Directory of Open Access Journals (Sweden)
Khripko Elena
2017-01-01
Full Text Available The operating efficiency of leaders in the construction industry is largely determined by the level of formation of managerial skills. Along with this, it is stated that the process of formation and development of managerial skills for leaders in the construction engineering is attended by a number of difficulties and frequently doesn’t make it past the threshold. This paper formulates a new approach in the formation of managerial skills of leaders in the construction engineering. The cross-sectoral assessment of managerial skills featuring the heads of the construction engineering and other industries, such as energy, metallurgy, showed low-performing managerial skills for the heads of the construction industry. The reasons of the formation of low-performing managerial skills in this article are referred to as peculiar features of organizational behavior in the construction engineering, in particular an imminent regression in the leader-follower system. Based on the results of the research conducted, the similarity of issues in regard to managerial skills in these areas is inherent in key differences in the formulation of priorities of corporate competencies.
Overcoming ICT Barriers in IBS Management Process in Malaysia Construction Industry
Directory of Open Access Journals (Sweden)
Soon Ern Peniel Ang
2017-01-01
Full Text Available As the result of government’s initiative and future outlook in uprising the awareness towards the implementation of sustainable elements in construction industries, the Industrialized Building System (IBS is one of the approaches that had been introduced as an alternative to conventional building method and produce the new strategy of reducing the waste of materials in construction. The IBS approach is actively promoted through several strategies and incentives as an alternative to conventional building methods. Extensive uptakes of modern Information Communication Technology (ICT applications are able to support the different IBS processes for effective production. However, it is argued that ICT uptake at the organizational level needs to be regularly improved. Thus, this paper fulfills the need to identify the critical barriers to ICT employment and highlighting the ICT drivers in enhancing the IBS management process. Critical barriers and drivers to ICT uptake were identified through questionnaire survey with industry stakeholders and were analyzed using mean index and critical t-value with the use of SPSS software. The critical drivers are top management support and commitment and improving the availability of the technologies. The critical drivers which were identified are significant in ensuring the enhancement of ICT implementation. Hence, any system in place should avoid the highest ranked barriers or seek to alleviate their impact by focusing on the identified drivers in order to enhance implementation of ICT in IBS process management.
Hamadeh, Ahmed F.; Sharma, Saroj K.; Amy, Gary L.
2014-01-01
Constructed wetlands (CWs) and managed aquifer recharge (MAR) represent commonly used natural treatment systems for reclamation and reuse of wastewater. However, each of these technologies have some limitations with respect to removal of different
Marović, Ivan; Hanak, Tomaš
2017-10-01
In the management of construction projects special attention should be given to the planning as the most important phase of decision-making process. Quality decision-making based on adequate and comprehensive collaboration of all involved stakeholders is crucial in project’s early stages. Fundamental reasons for existence of this problem arise from: specific conditions of construction industry (final products are inseparable from the location i.e. location has a strong influence of building design and its structural characteristics as well as technology which will be used during construction), investors’ desires and attitudes, and influence of socioeconomic and environment aspects. Considering all mentioned reasons one can conclude that selection of adequate construction site location for future investment is complex, low structured and multi-criteria problem. To take into account all the dimensions, the proposed model for selection of adequate site location is devised. The model is based on AHP (for designing the decision-making hierarchy) and PROMETHEE (for pairwise comparison of investment locations) methods. As a result of mixing basis feature of both methods, operational synergies can be achieved in multi-criteria decision analysis. Such gives the decision-maker a sense of assurance, knowing that if the procedure proposed by the presented model has been followed, it will lead to a rational decision, carefully and systematically thought out.
Ranking of Delay Factors for Makkah’s Construction Industry
Directory of Open Access Journals (Sweden)
Al-Emad Nashwan
2017-01-01
Full Text Available This paper presents identification of significant delay factors encountered by Makkah’s construction industry using quantitative approach. A structured questionnaire developed based on literature review was verified through pilot study involved selected construction experts. Questionnaire survey was conducted amongst Makkah construction practitioners include contractors, consultants and project management consultancy. The survey managed to collect 100 valid responses which were used to rank the factors using average index approach. Results of the analysis for 10 most significant factors causing construction delay in Makkah construction industry are Difficulties in financing project by contractor, Poor coordination between parties, Shortage of manpower, Delays in producing design documents, Improper planning and scheduling of the project, Delay in progress payments, Low productivity level of labour, Poor communication between parties, Unqualified workforce and Poor contract management. This finding is helpful to Makkah construction’s community particularly projects’ stakeholders in avoiding potential delay for their future projects.
Rodríguez, Gracia; Alegre, Francisco Javier; Martínez, Germán
2011-07-01
In recent years, significant advances have been made in business organization and management. The growing demands of clients as well as the globalization of world markets are among the many factors that have led to the establishment of systems of quality control and environmental management as a competitive strategy for businesses. When compared to other professional sectors, the construction sector has been slower to respond to environmental problems and to adopt Environmental Management Systems (EMS). In the world today the ISO 14001 standard is currently the main frame of reference used by construction companies to implement this type of management system. This article presents the results of a general study regarding the evaluation of the application of the ISO 14001 standard at civil engineering construction worksites in the Community of Madrid (Spain), specifically pertaining to requirement 4.4.1, Resources, roles, responsibilities, and authority. According to requirement 4.4.1, company executives should appoint people responsible for implementing the EMS and also specify their responsibilities and functions. The personnel designated for supervising environmental work should also have sufficient authority to establish and maintain the EMS. The results obtained were the following: - EMS supervisors did not generally possess adequate training and solid experience in construction work and in the environment. Furthermore, supervisors were usually forced to combine their environmental work with other tasks, which made their job even more difficult. - Generally speaking, supervisors were not given sufficient authority and autonomy because productivity at the construction site had priority over environmental management. This was due to the fact that the company management did not have a respectful attitude toward the environment, nor was the management actively involved in the establishment of the EMS. - Insufficient resources were allocated to the Environmental
Directory of Open Access Journals (Sweden)
Sumiani Yusoff
2015-03-01
Full Text Available This study seeks to explore the crucial part in EMS implementation; i.e. environmental aspects and impacts, Good Environmental Practice to be developed in construction site, as well as the level of awareness or understanding amongst site staffs on ISO 14001 EMS implementation in their organizations. Data were collected via interviews, surveys and site visits. A number of environmental aspects and impacts, and Good Environmental Practices based on ISO 14001:2004 have been identified. The level of understanding of the site staffs on ISO 14001 EMS requirements has been found to be good except for matters concerning Schedule Waste Management. In conclusion, the successful implementation of ISO 14001 EMS mainly depends on staffs‘ understanding.
Barbosa, A. A. R.; Vilnītis, M.
2017-10-01
Considering the efforts to optimize productivity and quality in the construction through the potential existing in the respective companies, this study presents an approach for identification, management and priorities of improvements actions at construction sites focusing status on productivity, added value and innovation in the socioeconomic context and scenario of construction industry in Brazil. Technological advances in recent years have made the Brazilian construction industry gradually incorporate technologies and forms of management, despite its traditionally conservative character. In current days, the innovations are pursued with the quest for greater quality, productivity, safety and customer satisfaction, which have been increasingly competitive and global. Construction in Brazil occupies an important role in the economy, directly contributing to GDP and acting on an extensive productive chain of suppliers, commercialization services and maintenance. The Brazilian construction sector has undergone major changes in recent years, facilitated by factors such as the resumption of public investments, the creation of laws that facilitate real estate, investments and funding of external resources, and the efforts of the Brazilian Quality and Productivity Program - PBQP H. However, the sector faces problems of a lack of skilled labour to meet the growth needs of the sector. There are still problems and challenges of quality and productivity that prevent full sector development. The aspects of nonconformity, low quality, high tax burden, outsourcing and informality of the workforce have not been adequately addressed and resolved. Through the use of indicators of productivity and growth, the challenges of the Brazilian construction industry are discussed and the possible paths for the sector that allow its full development and to reduce the distance between the Brazilian construction industry and that of the developed countries.
Event-based soil loss models for construction sites
Trenouth, William R.; Gharabaghi, Bahram
2015-05-01
The elevated rates of soil erosion stemming from land clearing and grading activities during urban development, can result in excessive amounts of eroded sediments entering waterways and causing harm to the biota living therein. However, construction site event-based soil loss simulations - required for reliable design of erosion and sediment controls - are one of the most uncertain types of hydrologic models. This study presents models with improved degree of accuracy to advance the design of erosion and sediment controls for construction sites. The new models are developed using multiple linear regression (MLR) on event-based permutations of the Universal Soil Loss Equation (USLE) and artificial neural networks (ANN). These models were developed using surface runoff monitoring datasets obtained from three sites - Greensborough, Cookstown, and Alcona - in Ontario and datasets mined from the literature for three additional sites - Treynor, Iowa, Coshocton, Ohio and Cordoba, Spain. The predictive MLR and ANN models can serve as both diagnostic and design tools for the effective sizing of erosion and sediment controls on active construction sites, and can be used for dynamic scenario forecasting when considering rapidly changing land use conditions during various phases of construction.
Construction Worker Fatigue Prediction Model Based on System Dynamic
Directory of Open Access Journals (Sweden)
Wahyu Adi Tri Joko
2017-01-01
Full Text Available Construction accident can be caused by internal and external factors such as worker fatigue and unsafe project environment. Tight schedule of construction project forcing construction worker to work overtime in long period. This situation leads to worker fatigue. This paper proposes a model to predict construction worker fatigue based on system dynamic (SD. System dynamic is used to represent correlation among internal and external factors and to simulate level of worker fatigue. To validate the model, 93 construction workers whom worked in a high rise building construction projects, were used as case study. The result shows that excessive workload, working elevation and age, are the main factors lead to construction worker fatigue. Simulation result also shows that these factors can increase worker fatigue level to 21.2% times compared to normal condition. Beside predicting worker fatigue level this model can also be used as early warning system to prevent construction worker accident
Directory of Open Access Journals (Sweden)
Renato Ribeiro Nogueira Ferraz
2014-12-01
Full Text Available Introduction: Empirical information provided by health care professionals acting in the first line of care report a constant increase in the number of civil construction workers that present painful acute conditions, in most cases associated with the existence of urinary tract calculi. Aims: Evaluating the prevalence of urinary lithiasis in civil construction workers, as a means to identify indicators for the management of health and personnel. Methods: Observational study based on directed questionnaire. Results: From the 94 participants, 18 (19% were lithiasic, mostly due to overweight and reduced fluid intake. Conclusion: The observed prevalence appeared to be two times greater than that of the general population. Thus, prevention for such condition gains relevance, in order to avoid discomfort for the worker, and also reduce costs due to absenteeism, improving productivity, benefiting the workers by performance and creating the perspective of an improved quality of life.
Revunova, Svetlana; Vlasenko, Vyacheslav; Bukreev, Anatoly
2017-10-01
The article proposes the models of innovative activity development, which is driven by the formation of “points of innovation-driven growth”. The models are based on the analysis of the current state and dynamics of innovative development of construction enterprises in the transport sector and take into account a number of essential organizational and economic changes in management. The authors substantiate implementing such development models as an organizational innovation that has a communication genesis. The use of the communication approach to the formation of “points of innovation-driven growth” allowed the authors to apply the mathematical tools of the graph theory in order to activate the innovative activity of the transport industry in the region. As a result, the authors have proposed models that allow constructing an optimal mechanism for the formation of “points of innovation-driven growth”.
Design and Construction of Manned Lunar Base
Li, Zhijie
2016-07-01
Building manned lunar base is one of the core aims of human lunar exploration project, which is also an important way to carry out the exploitation and utilization of lunar in situ resources. The most important part of manned lunar base is the design and construction of living habitation and many factors should be considered including science objective and site selection. Through investigating and research, the scientific goals of manned lunar base should be status and characteristics ascertainment of lunar available in situ resources, then developing necessary scientific experiments and utilization of lunar in situ resources by using special environment conditions of lunar surface. The site selection strategy of manned lunar base should rely on scientific goals according to special lunar surface environment and engineering capacity constraints, meanwhile, consulting the landing sites of foreign unmanned and manned lunar exploration, and choosing different typical regions of lunar surface and analyzing the landform and physiognomy, reachability, thermal environment, sunlight condition, micro meteoroids protection and utilization of in situ resources, after these steps, a logical lunar living habitation site should be confirmed. This paper brings out and compares three kinds of configurations with fabricating processes of manned lunar base, including rigid module, flexible and construction module manned lunar base. 1.The rigid habitation module is usually made by metal materials. The design and fabrication may consult the experience of space station, hence with mature technique. Because this configuration cannot be folded or deployed, which not only afford limit working and living room for astronauts, but also needs repetitious cargo transit between earth and moon for lunar base extending. 2. The flexible module habitation can be folded in fairing while launching. When deploying on moon, the configuration can be inflatable or mechanically-deployed, which means under
Integrated watershed management: a planning methodology for construction of new dams in Ethiopia
Bezuayehu, Tefera; Stroosnijder, L.
2007-01-01
Integrated watershed management (IWM) is emerging as an alternative to the centrally planned and sectoral approaches that currently characterize the planning process for dam construction in Ethiopia. This report clarifies the concept of IWM, and reviews the major social, environmental and economic
A framework for understanding waste management studies in construction.
Lu, Weisheng; Yuan, Hongping
2011-06-01
During the past decades, construction and demolition (C&D) waste issues have received increasing attention from both practitioners and researchers around the world. A plethora of research relating to C&D waste management (WM) has been published in scholarly journals. However, a comprehensive understanding of the C&D WM research is somehow absent in spite of its proliferation. The aim of this paper is to develop a framework that helps readers understand the C&D WM research as archived in selected journals. Papers under the topic of C&D WM are retrieved based on a set of rigorous procedures. The information of these papers is then analyzed with the assistance of the Qualitative Social Research (QSR) software package NVivo. A framework for understanding C&D WM research is created based on the analytic results. By following the framework, a bibliometric analysis of research in C&D WM is presented, followed by an in-depth literature analysis. It is found that C&D generation, reduction, and recycling are the three major topics in the discipline of C&D WM. Future research is recommended to (a) investigate C&D waste issues in wider scopes including design, maintenance and demolition, (b) develop a unified measurement for waste generation so that WM performance can be compared across various economies, and (c) enhance effectiveness of WM approaches (e.g. waste charging scheme) based on new WM concepts (e.g. Extended Producer Responsibility). In addition to the above research findings, the approach for producing the research framework can be useful references for other studies which attempt to understand the research of a given discipline. Copyright © 2011 Elsevier Ltd. All rights reserved.
A framework for understanding waste management studies in construction
International Nuclear Information System (INIS)
Lu Weisheng; Yuan Hongping
2011-01-01
During the past decades, construction and demolition (C and D) waste issues have received increasing attention from both practitioners and researchers around the world. A plethora of research relating to C and D waste management (WM) has been published in scholarly journals. However, a comprehensive understanding of the C and D WM research is somehow absent in spite of its proliferation. The aim of this paper is to develop a framework that helps readers understand the C and D WM research as archived in selected journals. Papers under the topic of C and D WM are retrieved based on a set of rigorous procedures. The information of these papers is then analyzed with the assistance of the Qualitative Social Research (QSR) software package NVivo. A framework for understanding C and D WM research is created based on the analytic results. By following the framework, a bibliometric analysis of research in C and D WM is presented, followed by an in-depth literature analysis. It is found that C and D generation, reduction, and recycling are the three major topics in the discipline of C and D WM. Future research is recommended to (a) investigate C and D waste issues in wider scopes including design, maintenance and demolition, (b) develop a unified measurement for waste generation so that WM performance can be compared across various economies, and (c) enhance effectiveness of WM approaches (e.g. waste charging scheme) based on new WM concepts (e.g. Extended Producer Responsibility). In addition to the above research findings, the approach for producing the research framework can be useful references for other studies which attempt to understand the research of a given discipline.
Alignment of Partnering with Construction IT
Directory of Open Access Journals (Sweden)
Eleni Papadonikolaki
2017-11-01
As the construction industry evolves into an information-driven sector, the alignment of construction IT with inter-organisational management is preeminent for managing the inherent complexities of the industry. In parallel, embracing inter-organisational approaches for information management such as BIM is a promisingway forward for SCM and construction management.
Pykhtin, Kirill; Simankina, Tatiana; Sharmanov, Vladimir; Kopytova, Anna
2017-10-01
The danger of injuries and accidents in various industries such as transportation and construction urges the government to control the occupational health and safety more strictly. However, in order to do so with the minimal costs modern risk management tools, have to be implemented. Risk-based approach is an essential tool for competent risk- assessment and used in a great variety of other countries, demonstrating great results in providing of safe working environment. The article describes the problems that the implementation of the method faces in Russia and suggests certain ways to resolve them.
A QUADTREE ORGANIZATION CONSTRUCTION AND SCHEDULING METHOD FOR URBAN 3D MODEL BASED ON WEIGHT
C. Yao; G. Peng; Y. Song; M. Duan
2017-01-01
The increasement of Urban 3D model precision and data quantity puts forward higher requirements for real-time rendering of digital city model. Improving the organization, management and scheduling of 3D model data in 3D digital city can improve the rendering effect and efficiency. This paper takes the complexity of urban models into account, proposes a Quadtree construction and scheduling rendering method for Urban 3D model based on weight. Divide Urban 3D model into different rendering weigh...
Marine Ecological Environment Management Based on Ecological Compensation Mechanisms
Directory of Open Access Journals (Sweden)
Qunzhen Qu
2016-12-01
Full Text Available The level of marine environmental management is a key factor in the successful implementation of marine power strategies. The improvement in management levels of marine environments requires innovation in marine management. In other words, the transformation of marine environmental management into marine ecological environment management must be done in order to achieve sustainable development of the marine economy. As an environmental economic policy that combines both administrative and market measures, ecological compensation mechanisms have significant advantages in marine ecological environment management. Based on the study of the current development of ecological compensation mechanisms in China, through the analysis of the connotation of marine ecological civilization, existing marine ecological protection practices and marine environmental management methods, this paper posits that the current marine ecological environment management in China should be established on the basis of ecological compensation mechanisms. At present, a lack of laws and regulations for overall marine ecological environment management is the key factor restricting the practice of marine ecological environment management. Therefore, it is necessary to explore the current path of marine ecological environment management in China from the perspective of the construction of legal system of ecological compensation law, the establishment of ecological compensation fees, ecological taxes and ecological compensation fund systems, and the clear status for a marine ecological management and supervision body.
Cascón-Pereira, Rosalía; Valverde, Mireia
2014-01-01
To understand the process by which clinician managers construct their professional identities and develop their attitudes toward managing. A qualitative study was performed, based on grounded theory, through in-depth interviews with 20 clinician managers selected through theoretical sampling in two public hospitals of Catalonia (Spain), participant observation, and documentation. Clinician managers' role meanings are constructed by comparing their roles with those of senior managers and clinicians. In this process, clinician managers seek to differentiate themselves from senior managers through the meanings constructed. In particular, they use proximity with reality and clinical knowledge as the main sources of differentiation. This study sheds light on why clinician managers develop adverse attitudes to managing and why they define themselves as clinicians rather than as managers. The explanation lies in the construction of the meanings they assign to managing as the basis of their attitudes to this role and professional identity. These findings have some practical implications for healthcare management. Copyright © 2014. Published by Elsevier Espana.
Directory of Open Access Journals (Sweden)
Zulay Giménez Palavicini
2008-04-01
Full Text Available Este artículo muestra los resultados de una investigación, en la cual se realizó un diagnóstico de las empresas de edificación que operan en la ciudad de Barquisimeto, Venezuela; para conocer el grado de aplicación de los conceptos de constructabilidad, reconocer las barreras para la implementación de dichos conceptos y la disposición de la alta gerencia de adoptar la metodología; para luego realizar una propuesta de los cambios pertinentes para la consolidación del programa de constructabilidad en la(s empresa(s. Igualmente se estudió la realidad interna de las empresas en cuanto a aspectos como: programación y planificación, dificultades en obra, abastecimiento, características del personal, uso de optimización y facilidades tecnológicas, que forman parte de la gestión cotidiana de la construcción. Los principales resultados son el alto grado de desconocimiento tanto del término "constructabilidad" como de sus beneficios de implementación, así como también gran disposición de las empresas en adoptar la metodología para la optimización de sus procesosThis paper presents research results diagnosing processes and performance of leading construction firms in Barquisimeto, Venezuela. Studied topics include: constructability application concepts, recognition of constructability barriers, top management recommendations to adopt the methodology, decision making process to lead program consolidation through change management. In addition, several internal aspects relative to construction firm management were analyzed, such as: scheduling and planning, construction difficulties, procurement, personnel characteristics, optimization process and technology implementation
Directory of Open Access Journals (Sweden)
Lapidus Azariy
2016-01-01
Full Text Available In this article, problems of mathematical modeling and experiment planning of the organization and management of construction. The authors designated the basic restrictions and the difficulties in this field. Concluded that the planning of research experiment is possible in the information sphere with using of heuristic, graphical, mathematical models, as well as neural networks and genetic algorithms. The authors note the need for use of expert information in the case of the formalization of quality parameters. The article presented an overview of the translation methods of qualitative information into mathematical language. Comparison of methods the qualimetry of USSR scientists, the analytic hierarchy process and fuzzy set theory were performed. The benefits of the latter for interpretation of qualitative parameters were identified. The authors have given many examples of application fuzzy sets for formalization of organizational factors of construction processes. Finally, there conclusion was made about progressiveness and effectiveness of fuzzy set theory to describe the qualitative parameters of organization and management of construction.
Construction Marketing: Developing a Reference Framework
Directory of Open Access Journals (Sweden)
Mahmood Mokhtariani
2017-01-01
Full Text Available Successful companies are strongly committed to marketing management. However, marketing is either misunderstood or completely neglected in many construction companies, mainly due to the difficulty of applying conventional marketing in the industry, accompanied by the lack of sufficient research on the nature of marketing and tailored marketing theories and strategies for the construction. This study attempts to fill a part of this gap by examining the nature of the construction industry from the marketing viewpoint and developing a comprehensive framework. A systematic investigation into the nature via a combination of Kotler’s product classification system and Lovelock’s classification criteria reveals that construction is an “industrial, project-based, and primarily service-oriented” (IPS product with specific characteristics from the marketing perspective. Based on this nature, a reference framework for strategic marketing planning is developed through a literature review based on grounded theory and using the focus group discussion as a refinement tool. The framework indicates that construction companies are involved in and should plan for three working fields—project-based activities, relationship marketing, and marketing mix-related functions. The findings provide a fundamental basis that helps researchers and practitioners gain a true understanding of the concepts and scope of construction marketing and draw a clear and practical roadmap for future work.
Biological information systems: Evolution as cognition-based information management.
Miller, William B
2018-05-01
An alternative biological synthesis is presented that conceptualizes evolutionary biology as an epiphenomenon of integrated self-referential information management. Since all biological information has inherent ambiguity, the systematic assessment of information is required by living organisms to maintain self-identity and homeostatic equipoise in confrontation with environmental challenges. Through their self-referential attachment to information space, cells are the cornerstone of biological action. That individualized assessment of information space permits self-referential, self-organizing niche construction. That deployment of information and its subsequent selection enacted the dominant stable unicellular informational architectures whose biological expressions are the prokaryotic, archaeal, and eukaryotic unicellular forms. Multicellularity represents the collective appraisal of equivocal environmental information through a shared information space. This concerted action can be viewed as systematized information management to improve information quality for the maintenance of preferred homeostatic boundaries among the varied participants. When reiterated in successive scales, this same collaborative exchange of information yields macroscopic organisms as obligatory multicellular holobionts. Cognition-Based Evolution (CBE) upholds that assessment of information precedes biological action, and the deployment of information through integrative self-referential niche construction and natural cellular engineering antecedes selection. Therefore, evolutionary biology can be framed as a complex reciprocating interactome that consists of the assessment, communication, deployment and management of information by self-referential organisms at multiple scales in continuous confrontation with environmental stresses. Copyright © 2017 Elsevier Ltd. All rights reserved.
Using a data base management system for modelling SSME test history data
Abernethy, K.
1985-01-01
The usefulness of a data base management system (DBMS) for modelling historical test data for the complete series of static test firings for the Space Shuttle Main Engine (SSME) was assessed. From an analysis of user data base query requirements, it became clear that a relational DMBS which included a relationally complete query language would permit a model satisfying the query requirements. Representative models and sample queries are discussed. A list of environment-particular evaluation criteria for the desired DBMS was constructed; these criteria include requirements in the areas of user-interface complexity, program independence, flexibility, modifiability, and output capability. The evaluation process included the construction of several prototype data bases for user assessement. The systems studied, representing the three major DBMS conceptual models, were: MIRADS, a hierarchical system; DMS-1100, a CODASYL-based network system; ORACLE, a relational system; and DATATRIEVE, a relational-type system.
Strategic management: An Eastern Cape construction SME case study
African Journals Online (AJOL)
term growth and development of the economy of the country. The development and growth of construction SMEs are important for all countries, as a strong SME base has the capacity to produce a high-quality infrastructure for the country.
Yazdanbakhsh, Ardavan
2018-04-27
Several pioneering life cycle assessment (LCA) studies have been conducted in the past to assess the environmental impact of specific methods for managing mineral construction and demolition waste (MCDW), such as recycling the waste for use in concrete. Those studies focus on comparing the use of recycled MCDW and that of virgin components to produce materials or systems that serve specified functions. Often, the approaches adopted by the studies do not account for the potential environmental consequence of avoiding the existing or alternative waste management practices. The present work focuses on how product systems need to be defined in recycling LCA studies and what processes need to be within the system boundaries. A bi-level LCA framework is presented for modelling alternative waste management approaches in which the impacts are measured and compared at two scales of strategy and decision-making. Different functional units are defined for each level, all of which correspond to the same flow of MCDW in a cascade of product systems. For the sole purpose of demonstrating how the framework is implemented an illustrative example is presented, based on real data and a number of simplifying assumptions, which compares the impacts of a number of potential MCDW management strategies in New York City. Copyright © 2018 Elsevier Ltd. All rights reserved.
Parisi Kern, Andrea; Ferreira Dias, Michele; Piva Kulakowski, Marlova; Paulo Gomes, Luciana
2015-05-01
Reducing construction waste is becoming a key environmental issue in the construction industry. The quantification of waste generation rates in the construction sector is an invaluable management tool in supporting mitigation actions. However, the quantification of waste can be a difficult process because of the specific characteristics and the wide range of materials used in different construction projects. Large variations are observed in the methods used to predict the amount of waste generated because of the range of variables involved in construction processes and the different contexts in which these methods are employed. This paper proposes a statistical model to determine the amount of waste generated in the construction of high-rise buildings by assessing the influence of design process and production system, often mentioned as the major culprits behind the generation of waste in construction. Multiple regression was used to conduct a case study based on multiple sources of data of eighteen residential buildings. The resulting statistical model produced dependent (i.e. amount of waste generated) and independent variables associated with the design and the production system used. The best regression model obtained from the sample data resulted in an adjusted R(2) value of 0.694, which means that it predicts approximately 69% of the factors involved in the generation of waste in similar constructions. Most independent variables showed a low determination coefficient when assessed in isolation, which emphasizes the importance of assessing their joint influence on the response (dependent) variable. Copyright © 2015 Elsevier Ltd. All rights reserved.