WorldWideScience

Sample records for construction equipment

  1. 21 CFR 211.65 - Equipment construction.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 4 2010-04-01 2010-04-01 false Equipment construction. 211.65 Section 211.65 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED) DRUGS... construction. (a) Equipment shall be constructed so that surfaces that contact components, in-process materials...

  2. Profit ability versus construction equipment maintenance

    OpenAIRE

    Clutts, Craig A.

    2010-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited Construction equipment is a high cost of capital investment necessary for the successful existence of a private construction company and essential to the mission success of the Naval Construction Force (NCF). The highest impact cost factor other than the initial purchase investment is the expenses related to maintenance and repair. As the equipment ages, the ownership costs decrease an...

  3. Modelling the factors influencing the selection of the construction equipment for Indian construction organizations

    Directory of Open Access Journals (Sweden)

    S.V.S. Raja Prasad

    2016-09-01

    Full Text Available The contribution of Indian construction sector to the GDP is approximately 10%. Under new government policy, it is anticipated that $1000 Billion share for exclusively infrastructure segment would be completed within the next few years. Construction sector in developing country like India still depends on labor and the practice of mechanization, adopting to use of versatile construction equipment is not in force. The need for implementing new technologies and automation is essential to improve the quality, safety and efficiency. To meet the challenges ahead the construction, organizations should focus on utilization of machinery/equipment to achieve desirable results. Modern construction is characterized by the increase in utilization of equipment to accomplish numerous construction activities. The selection of construction equipment often affects the required amount of time and effort. It is therefore important for managements of construction organizations and planners to be familiar with the features of various types of equipment commonly used in construction activities. The selection of appropriate equipment is a crucial decision making process as it involves huge capital investment. The purpose of the present study is to develop a model pertaining to the factors influencing the selection of construction equipment by using interpretive structural modelling and the results indicate that productivity and safety are the important factors in selection of equipment in Indian construction organizations.

  4. Nuclear power plant equipment design and construction rules

    International Nuclear Information System (INIS)

    Boiron, P.

    1983-03-01

    Presentation of the AFCEN (French association for nuclear power plant equipment design and construction rules) working, of its edition activity and of somes of its edited documents such as RCC-C (design and construction rules for PWR power plant fuel assemblies) and RCC-E (design and construction rules for nuclear facility electrical equipments) [fr

  5. Simulation Gaming in Construction: ER, The Equipment Replacement Game.

    Science.gov (United States)

    Nassar, Khaled

    2002-01-01

    The Equipment Replacement simulation game can be used to explain the different effects of various equipment buy/sell strategies on the economic performance of construction companies. The probabilistic aspect of demand in the construction market is incorporated. The game is implemented using Excel and Visual Basic for Applications. (Author/SK)

  6. Design and construction of the Portable Industrial X-Ray Equipment

    International Nuclear Information System (INIS)

    Nguyen Phuc; Nguyen Van Si; Le Tien Quan; Trinh Anh Tuan; Nguyen Manh Hung; Trinh Dinh Tuong

    2011-01-01

    The main purposes of the project are the supporting to design and construction of the Portable Industrial X-Ray Equipment; with the accuracy ±2% of Output High Voltage 200 kV and Tube current 5 mA. The Equipment is composed of control unit, X-ray generator, and power cable, connection cable. X-ray generator is assembling construction X-ray tube, H.V transformer together with gas insulation (SF6) are sealed up in aluminum bucked cabinet, fan and heat-sink are mounted in the end of X-ray generator as cooling, SF6 is a gas electrical performance to H.V. Alarm lamp is used to warn, flashing, show generating X-ray. Control unit is box construction. Four printed circuit boards (PCB) and electronic device are mounted in it. All operating buttons switches and displays are equipped on the panel. We have completed to design and construct the Portable Industrial X-Ray Equipment; and have tested the electronic parameters of all test points and the main parameters of equipment (the accuracy ±2% of Output High Voltage 200 kV and Tube current 5 mA). We also have successful used the Portable Industrial X-Ray Equipment to evaluate the welds in industry. (author)

  7. The adoption of innovative asphalt equipment in road construction

    NARCIS (Netherlands)

    Habets, M.J.M.; Voordijk, Johannes T.; van der Sijde, Peter

    2011-01-01

    Purpose – The purpose of this paper is to provide insight into the adoption process of innovative asphalt equipment in road construction and how the level of knowledge as characterised by the level of education in the companies affects this process. The emphasis is on equipment used for transporting

  8. An analysis of USMC heavy construction equipment (HCE) requirements

    OpenAIRE

    Blaxton, Allen C.; Fay, Michael J.; Hansen, Cheryl M.; Zuchristian, Christopher M.

    2003-01-01

    MBA Professional Report Approved for public release; distribution is unlimited. According to I and L, HQMC, the Marine Corps needs to re-evaluate current operational requirements for engineer construction equipment. Acquisition and force allocation levels for equipment have remained essentially at constant 1970's, Cold War levels. Because acquisition and allocation levels haven't changed at the same rate as personnel, there is a perception that much of the existing equipment is unnecess...

  9. 27 CFR 19.825 - Construction and equipment.

    Science.gov (United States)

    2010-04-01

    ... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Construction and equipment. 19.825 Section 19.825 Alcohol, Tobacco Products and Firearms ALCOHOL AND TOBACCO TAX AND TRADE BUREAU, DEPARTMENT OF THE TREASURY LIQUORS DISTILLED SPIRITS PLANTS Production of Vinegar by the Vaporizing Process...

  10. 77 FR 23117 - Rigging Equipment for Material Handling Construction Standard; Correction and Technical Amendment

    Science.gov (United States)

    2012-04-18

    ... Equipment for Material Handling Construction Standard; Correction and Technical Amendment AGENCY... AND HEALTH REGULATIONS FOR CONSTRUCTION Subpart H--Materials Handling, Storage, Use, and Disposal 0 1... amendment. SUMMARY: OSHA is correcting its sling standard for construction titled ``Rigging Equipment for...

  11. Design and construction of a air pollutant gases sampler equipment

    International Nuclear Information System (INIS)

    Gomez S, R.A.; Rodriguez, T.J.

    1996-01-01

    This thesis is about the sketch and construction of an equipment which samples contaminated gases in the air. The topic of this work, is to propose a solution for imported and national equipment. The solution consist on lower prices of imported and national equipment without loosing the accuracy and the precision of those now available. The investigation shows all process to sample gases and theirs measurement for which all the mechanical, electric and electronic equipment, and the necessary software for giving the results in a computerized way were outlined. With this work it was able to succeed in measurements with a national low price, accurate, reliable, programmable, completely automatic and easy to use. This equipment exceed in accuracy the Japanese and the american equipment

  12. UOE Pipe Manufacturing Process Simulation: Equipment Designing and Construction

    Science.gov (United States)

    Delistoian, Dmitri; Chirchor, Mihael

    2017-12-01

    UOE pipe manufacturing process influence directly on pipeline resilience and operation capacity. At present most spreaded pipe manufacturing method is UOE. This method is based on cold forming. After each technological step appears a certain stress and strain level. For pipe stress strain study is designed and constructed special equipment that simulate entire technological process.UOE pipe equipment is dedicated for manufacturing of longitudinally submerged arc welded DN 400 (16 inch) steel pipe.

  13. Non-standard equipment for construction of vertical shafts

    Science.gov (United States)

    Yagodkin, F. I.; Prokopov, A. Y.; Pleshko, M. S.; Pankratenko, A. N.

    2017-10-01

    The article deals with the modern problems of construction and reconstruction of vertical shafts of mines, which require innovative technical solutions in the mechanization of mining operations. The examples developed by the authors of the original equipment and technologies, are successfully implemented for the mining industry in Russia.

  14. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    Directory of Open Access Journals (Sweden)

    Ulang N. Md

    2014-01-01

    Full Text Available Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal Protective Equipment (PPE is one of the important means to protect the wearer from hazards in the workplace. Since this equipment is the last frontier of the wearer from worksite hazards, it is important to select it based on the job scope and the intended protection. Therefore, this study was formulated to find out the level of knowledge and awareness of construction workers on PPE usage. It was also important to know what make the workers would want or do not want to use the PPE. It was found in this study that the level of awareness and knowledge among workers on the proper use of PPE is moderate. Construction sites accident can be further be reduced with proper implementation of PPE voluntarily by all workers.

  15. The procedure of selecting the best construction equipment by the set of its quantitative characteristics

    Directory of Open Access Journals (Sweden)

    Romanov Petr

    2017-01-01

    Full Text Available Today’s construction projects are highly mechanized. That#x2019;s why selection of right equipment has always been a key factor in the success of any construction project. This decision is typically made by comparison of equipment feature, productivity, capacity and cost. The article describes the approach to selecting the best set of construction equipment from the available options by the set of its quantitative characteristics. It is proposed to carry out the evaluation of options and selection of the best option based on the method of spectral analysis. The article presents the results of the selection of the most appropriate floor screed conveyor for purchasing by construction company using the specified method.

  16. Design and construction rules for electrical equipments of nuclear islands. 3. ed.

    International Nuclear Information System (INIS)

    1993-01-01

    The French design and construction for electrical equipments of nuclear islands (RCC-E) deals with equipments of which the failure may have consequences on the safety of persons or appreciable effects on the availability of the power plant. This book presents the rules concerning (1) qualification procedure, (2) the design of functional units, (3) the installation (environmental conditions, protection rules), (4) the constituent elements of equipments, (5) the control and testing methods

  17. On construction method of shipborne and airborne radar intelligence and related equipment knowledge graph

    Science.gov (United States)

    Hao, Ruizhe; Huang, Jian

    2017-08-01

    Knowledge graph construction in military intelligence domain is sprouting but technically immature. This paper presents a method to construct the heterogeneous knowledge graph in the field of shipborne and airborne radar and equipment. Based on the expert knowledge and the up-to-date Internet open source information, we construct the knowledge graph of radar characteristic information and the equipment respectively, and establish relationships between two graphs, providing the pipeline and method for the intelligence organization and management in the context of the crowding battlefields big data.

  18. The Use of Noise Dampening Mats to Reduce Heavy-Equipment Noise Exposures in Construction

    Directory of Open Access Journals (Sweden)

    Sabah Saleh

    2017-06-01

    Full Text Available The performance of sound barriers was evaluated to determine their technical effectiveness and practicality in reducing noise exposures to operating engineers in construction. Commercially purchased sound dampening mats (SDMats were installed inside three heavy-equipment engine compartments. Sound pressure levels (SPLs were measured before and after installing the SDMats while the equipment was on idle and full-throttle settings where it normally operates. SPLs inside the heavy-equipment operator cabs were significantly reduced by 5.6–7.6 dBA on the full-throttle setting following installation of the SDMats (p<0.01. The evaluated engineering control intervention was simple to install, affordable, and substantially reduced the engine noise reaching the heavy-equipment operator, potentially reducing reliance on hearing-protection devices to protect construction workers from noise exposures.

  19. DETECTION OF UNAUTHORIZED CONSTRUCTION EQUIPMENT IN PIPELINE RIGHT-OF-WAYS

    International Nuclear Information System (INIS)

    James E. Huebler

    2002-01-01

    Natural gas transmission companies mark the right-of-way areas where pipelines are buried with warning signs to prevent accidental third-party damage. Nevertheless, pipelines are sometimes damaged by third-party construction equipment. A single incident can be devastating, causing death and millions of dollars of property loss. This damage could be prevented if potentially hazardous construction equipment could be detected and identified before the pipeline was damaged. The Gas Technology Institute (GTI) is developing a system to solve this problem by using an optical fiber as a distributed sensor and interrogating the fiber with an optical time domain reflectometer. Key issues are the ability to detect encroachment and the ability to discriminate among potentially hazardous and benign encroachment. The work performed in the first quarter of the project includes development of the Research Management Plan, writing a paper assessing of the state-of-the-art in encroachment and third party damage detection, and development of factors for selecting the optical fiber sensors

  20. Constructing a User Interface for Cellular Phones Using Equipment and its Relations

    Directory of Open Access Journals (Sweden)

    Misayo Kitamura

    2003-04-01

    Full Text Available In a domain of SCADA (Supervisory Control And Data Acquisition systems, it is necessary to obtain information about plants such as water plants in remote places using a cellular phone in order to ascertain plant status in case of emergency.T o utilize the small screen of a cellular phone and to eliminate the engineering cost of creating de.nition data to show plant status, a method of constructing user interface using equipment in the plant and its relations is proposed. In this method, some equipment is selected from all supervised equipment using the relations between the equipment, and then the content to be displayed is generated dynamically using the selected equipment. The equipment in plants is organized as a graph structure, which involves the equipment and the relations between the equipment.T he relations adopted in this method are both the physical connections between the equipment and the conceptual relationships.The result of the selection depends on the relations and their parameter values called the context dependent weight, which changes dynamically by viewpoints.

  1. HYDRAULIC UNITS FOR DRIVING SYSTEMS OF RUNNING EQUIPMENT IN ROAD CONSTRUCTION MACHINERY

    Directory of Open Access Journals (Sweden)

    A. Ja. Kotlobai

    2016-01-01

    Full Text Available Operational efficiency of multi-functional road construction machines depends on number of working bodies which are simultaneously performing technological operations. Systems for propulsion pto to the running equipment drive and active working bodies of road construction machines are developing in the way of using three-axis hydraulic drives. When designing a hydraulic system for road construction machinery dividing of power flow from propulsion to the running equipment drive and active working bodies is considered as rather essential problem. Leading companies do not pay attention to the development of flow divider designs, preferring to produce more expensive multi-flow pumps. One of the ways to increase efficiency of multi-functional road construction machinery is an implementation of running equipment hydraulic driving system based on a mono-aggregate pump unit which consists of a pump and a volumetric divider of power fluid flow. A principle of volumetric division and summing-up of power fluid flows, technical realization and methodology for calculation of key parameters of discrete flow distributors has been developed on the basis of discrete hydraulics regulations. The paper presents results of mathematical modeling of hydraulic systems equipped with the discrete flow distributor. Analysis of a dual-motor hydraulic drive operation has shown the following results: a discrete flow distributor ensures independent load mode of the current consumer circuit operation from the load mode of the second consumer circuit within a wide range of loads; rational value of working fluid flow discretization parameter is the following value interval k = 4–6, maximum value of parameter efficiency is reached when an angular velocity of a distributor rotor coincides with the angular velocity of a pump shaft; discrete flow distributor provides a possibility to change parameters of hydraulic flow feeding in consumers’ pressure lines within a wide range

  2. Guideline for design and construction radiation monitoring equipments for Tokai reprocessing plant

    International Nuclear Information System (INIS)

    Miyabe, Kenjiro; Ninomiya, Kazushige; Jin, Kazumi; Morifuji, Masayuki; Nemoto, Kazuhiko; Sato, Akira; Kawai, Keiichi

    1999-12-01

    Various kind of radiation monitoring equipment are used in radiation controlled area at each facility of Tokai reprocessing plant. These equipments have been designed and constructed based on the users requirements, and permitted by governmental regulation office. And, design has been carried out in consideration of the adoption of the new technology and our operational experience. Then, it has been used effectively for the radiation control of the facilities. This report summarizes the technical requirements that should be taken into consideration in the design and installation of radiation monitoring equipments. These requirements are fundamentally applicable when the equipments of the new facilities will be designed or the present instruments will be replaced. (author)

  3. Modeling Manpower and Equipment Productivity in Tall Building Construction Projects

    Science.gov (United States)

    Mudumbai Krishnaswamy, Parthasarathy; Rajiah, Murugasan; Vasan, Ramya

    2017-12-01

    Tall building construction projects involve two critical resources of manpower and equipment. Their usage, however, widely varies due to several factors affecting their productivity. Currently, no systematic study for estimating and increasing their productivity is available. What is prevalent is the use of empirical data, experience of similar projects and assumptions. As tall building projects are here to stay and increase, to meet the emerging demands in ever shrinking urban spaces, it is imperative to explore ways and means of scientific productivity models for basic construction activities: concrete, reinforcement, formwork, block work and plastering for the input of specific resources in a mixed environment of manpower and equipment usage. Data pertaining to 72 tall building projects in India were collected and analyzed. Then, suitable productivity estimation models were developed using multiple linear regression analysis and validated using independent field data. It is hoped that the models developed in the study will be useful for quantity surveyors, cost engineers and project managers to estimate productivity of resources in tall building projects.

  4. Anchorage of equipment - requirements and verification methods with emphasis on equipment of existing and constructed VVER-type nuclear power plants

    International Nuclear Information System (INIS)

    Masopust, R.

    1999-01-01

    Criteria and verification methods which are recommended for use in the capacity evaluation of anchorage of safety-related equipment at WWER-type nuclear power plants are presented. Developed in compliance with the relevant basic standards documents specifically for anchorage of WWER-type equipment components, the criteria and methods cover different types of anchor bolts and other anchorage elements which are typical of existing, constructed, or reconstructed WWER-type nuclear power plants

  5. Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-06-01

    Full Text Available Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM as analytical hierarchy process (AHP have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.

  6. NIF special equipment construction health and safety plan

    Energy Technology Data Exchange (ETDEWEB)

    Sawicki, R.H.

    1997-07-28

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES&H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan.

  7. NIF special equipment construction health and safety plan

    International Nuclear Information System (INIS)

    Sawicki, R.H.

    1997-01-01

    The purpose of this plan is to identify how the construction and deployment activities of the National Ignition Facility (NIF) Special Equipment (SE) will be safely executed. This plan includes an identification of (1) the safety-related responsibilities of the SE people and their interaction with other organizations involved; (2) safety related requirements, policies, and documentation; (3) a list of the potential hazards unique to SE systems and the mechanisms that will be implemented to control them to acceptable levels; (4) a summary of Environmental Safety and Health (ES ampersand H) training requirements; and (5) requirements of contractor safety plans that will be developed and used by all SE contractors participating in site activities. This plan is a subsidiary document to the NIF Construction Safety Program (CSP) and is intended to compliment the requirements stated therein with additional details specific to the safety needs of the SE construction-related activities. If a conflict arises between these two documents, the CSP will supersede. It is important to note that this plan does not list all of the potential hazards and their controls because the design and safety analysis process is still ongoing. Additional safety issues win be addressed in the Final Safety Analysis Report, Operational Safety Procedures (OSPs), and other plans and procedures as described in Section 3.0 of this plan

  8. The AP1000{sup R} China projects move forward to construction completion and equipment installation

    Energy Technology Data Exchange (ETDEWEB)

    Harrop, G. [Westinghouse Electric Company LLC, 1000 Westinghouse Drive, Cranberry Township, PA 16066 (United States)

    2012-07-01

    The AP1000 design is the only Generation III+ technology to receive design certification from the U.S. Nuclear Regulatory Commission. This evolutionary design provides the highest safety and performance standards and has several distinct advantages over other designs, including improved operations and reduced construction schedule risks through the use of modern, modular, engineering principles that allow construction and fabrication tasks traditionally performed in sequence to be undertaken in parallel. Since the first granting of Design Certification in 2005 by the NRC, the AP1000 design has been modified to meet emergent NRC requirements such as those requiring the design to withstand the impact of an aircraft crash. Both domestic and foreign utilities have turned to the Westinghouse AP1000 plant design to meet their near - and long-term sustainable energy needs. The first ever deployment of this advanced U.S. nuclear power technology began in China in 2007 with the award of a contract to build four AP1000 units, constructed in pairs at the coastal sites of Sanmen (Zhejiang Province) and Haiyang (Shandong Province). Currently, all four units are at an advanced stage of construction. The commercial operation date for Sanmen Unit 1 is November 2013 followed by Haiyang Unit 1 being operational in May 2014. Construction and equipment manufacture is at an advanced stage. Sanmen Unit 1 equipment that has been delivered includes the reactor vessel, the reactor vessel closure head, the passive residual heat removal heat exchanger, the integrated head package, the polar crane, and the refueling machine. The steam generators are also completed. The RV was installed within the containment vessel building in September 2011. The installation of this major equipment will allow the setting of the containment vessel top head. Haiyang Unit 1 is also achieving significant progress. Significant benefits continue to be realized as a result of lessons learned and experience gained

  9. Design and construction of stepper motor controller for brachy-therapy equipment

    International Nuclear Information System (INIS)

    Ahmad Rifai; Usep Setia Gunawan; Indarzah Masbatin Putra

    2011-01-01

    Based on a microcontroller, a stepper motor controller for brachy-therapy equipment has been designed and prototyped. The embedded control program routine and its other associated routines enable the microcontroller to generate required pulses via external commands for stepper motor based position control. The controller receives ASCII text command via a serial port. The constructed algorithm implements the widely used method that allows motor to rotate in three phases, i.e: acceleration, constant speed, and deceleration. (author)

  10. Design and Construction of Equipment for Applying the Geophysical Prospecting Method Electric Tomography

    Directory of Open Access Journals (Sweden)

    Fabio Héctor Giraldo Sánchez

    2013-06-01

    Full Text Available Outlines the procedure for the design and construction of electric equipment for geophysical prospecting through electrical tomography method. The team is of average power, ensuring exploration depths quite suitable for applications and commercial and geotechnical studies. The device is essentially a DC voltage source of 500 volts that is able to provide a maximum current of 1 amp. It also contains a small charge current source of electrical currents counteract naturally found in the subsoil and are manifested as a difference in the surface potential. A general explanation of the geophysical method in question, helps to understand the basic principles of operation of the equipment and functions to be fulfilled. After building the team, we conducted a field data acquisition, in area near the town of Gachancipa Cundinamarca. The data from this equipment are processed with specialized software. The images obtained with the software presents the distributions of subsurface resistivity can be associated with the possible structures and geology of the study area.

  11. Construction and equipment requirements for installations and laboratories handling unsealed radioactive materials in low and medium activity - Proposal of an Israeli standard

    Energy Technology Data Exchange (ETDEWEB)

    Ben-Shlomo, A; Schlesinger, T; Barshad, M [Soreq Nuclear Research Center, Yavne (Israel)

    1993-10-01

    Working with unsealed radioactive materials involves risks of internal or external exposure to ionizing radiation. Exposure of human beings to ionizing radiation involves adverse health effects and must be prevented or at least reduced to reasonable levels. Radiation sources in this work are unsealed radioactive materials, that may be solids, liquid or in gaseous states, and in varying toxic levels. Various works and actions that are performed on the unsealed radioactive materials have varying potentials of dispersion, contamination and exposure, so that the combination of the type of work activity, isotope characteristics and physical state dictate the internal and external exposure risks. In order to limit the exposure of the personnel of installations and laboratories which deals with unsealed radioactive materials, national and international authorities and organizations standards and procedures for the requirements of construction and equipment of such installations and laboratories. This document means to be a proposal for an Israeli standard requirements for equipment and construction of installations working with low and medium activity unsealed radioactive materials. The targets for defining the, construction and equipment, requirements are: a. Safety and proper protection of personnel and public from external and internal exposure while the work is done properly. Proper protection against the risk of contaminating the environment. c. Standardization of requirements. d. Proper design of installations and laboratories. e. Supply means for evaluation and reduction of construction costs.The equipment detailed here refers to fixed (none movable) equipment which is a part of the construction of the laboratory or installation, unless specified otherwise. The document starts with a review of the recommendations of some international organizations (WHO, IAEA, NRPB) for construction and equipment requirements for these laboratories and installations. Then the

  12. Interior noise analysis of a construction equipment cabin based on airborne and structure-borne noise predictions

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sung Hee; Hong, Suk Yoon [Seoul National University, Seoul (Korea, Republic of); Song, Jee Hun [Chonnam National University, Gwangju (Korea, Republic of); Joo, Won Ho [Hyundai Heavy Industries Co. Ltd, Ulsan (Korea, Republic of)

    2012-04-15

    Noise from construction equipment affects not only surrounding residents, but also the operators of the machines. Noise that affects drivers must be evaluated during the preliminary design stage. This paper suggests an interior noise analysis procedure for construction equipment cabins. The analysis procedure, which can be used in the preliminary design stage, was investigated for airborne and structure borne noise. The total interior noise of a cabin was predicted from the airborne noise analysis and structure-borne noise analysis. The analysis procedure consists of four steps: modeling, vibration analysis, acoustic analysis and total interior noise analysis. A mesh model of a cabin for numerical analysis was made at the modeling step. At the vibration analysis step, the mesh model was verified and modal analysis and frequency response analysis are performed. At the acoustic analysis step, the vibration results from the vibration analysis step were used as initial values for radiated noise analysis and noise reduction analysis. Finally, the total cabin interior noise was predicted using the acoustic results from the acoustic analysis step. Each step was applied to a cabin of a middle-sized excavator and verified by comparison with measured data. The cabin interior noise of a middle-sized wheel loader and a large-sized forklift were predicted using the analysis procedure of the four steps and were compared with measured data. The interior noise analysis procedure of construction equipment cabins is expected to be used during the preliminary design stage.

  13. Interior noise analysis of a construction equipment cabin based on airborne and structure-borne noise predictions

    International Nuclear Information System (INIS)

    Kim, Sung Hee; Hong, Suk Yoon; Song, Jee Hun; Joo, Won Ho

    2012-01-01

    Noise from construction equipment affects not only surrounding residents, but also the operators of the machines. Noise that affects drivers must be evaluated during the preliminary design stage. This paper suggests an interior noise analysis procedure for construction equipment cabins. The analysis procedure, which can be used in the preliminary design stage, was investigated for airborne and structure borne noise. The total interior noise of a cabin was predicted from the airborne noise analysis and structure-borne noise analysis. The analysis procedure consists of four steps: modeling, vibration analysis, acoustic analysis and total interior noise analysis. A mesh model of a cabin for numerical analysis was made at the modeling step. At the vibration analysis step, the mesh model was verified and modal analysis and frequency response analysis are performed. At the acoustic analysis step, the vibration results from the vibration analysis step were used as initial values for radiated noise analysis and noise reduction analysis. Finally, the total cabin interior noise was predicted using the acoustic results from the acoustic analysis step. Each step was applied to a cabin of a middle-sized excavator and verified by comparison with measured data. The cabin interior noise of a middle-sized wheel loader and a large-sized forklift were predicted using the analysis procedure of the four steps and were compared with measured data. The interior noise analysis procedure of construction equipment cabins is expected to be used during the preliminary design stage

  14. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  15. A computer based approach for Material, Manpower and Equipment managementin the Construction Projects

    Science.gov (United States)

    Sasidhar, Jaladanki; Muthu, D.; Venkatasubramanian, C.; Ramakrishnan, K.

    2017-07-01

    The success of any construction project will depend on efficient management of resources in a perfect manner to complete the project with a reasonable budget and time and the quality cannot be compromised. The efficient and timely procurement of material, deployment of adequate labor at correct time and mobilization of machinery lacking in time, all of them causes delay, lack of quality and finally affect the project cost. It is known factor that Project cost can be controlled by taking corrective actions on mobilization of resources at a right time. This research focuses on integration of management systems with the computer to generate the model which uses OOM data structure which decides to include automatic commodity code generation, automatic takeoff execution, intelligent purchase order generation, and components of design and schedule integration to overcome the problems of stock out. To overcome the problem in equipment management system inventory management module is suggested and the data set of equipment registration number, equipment number, description, date of purchase, manufacturer, equipment price, market value, life of equipment, production data of the equipment which includes equipment number, date, name of the job, hourly rate, insurance, depreciation cost of the equipment, taxes, storage cost, interest, oil, grease, and fuel consumption, etc. is analyzed and the decision support systems to overcome the problem arising out improper management is generated. The problem on labor is managed using scheduling, Strategic management of human resources. From the generated support systems tool, the resources are mobilized at a right time and help the project manager to finish project in time and thereby save the abnormal project cost and also provides the percentage that can be improved and also research focuses on determining the percentage of delays that are caused by lack of management of materials, manpower and machinery in different types of projects

  16. Nonfatal tool- or equipment-related injuries treated in US emergency departments among workers in the construction industry, 1998-2005.

    Science.gov (United States)

    Lipscomb, Hester J; Schoenfisch, Ashley L; Shishlov, Kirill S; Myers, Douglas J

    2010-06-01

    Individuals in the construction industry are exposed to a variety of tools and pieces of equipment as they work. Data from the National Institute for Occupational Safety and Health (NIOSH) occupational supplement to the National Electronic Injury Surveillance System (NEISS-Work) were used to characterize tool- and equipment-related injuries among workers in the construction industry that were treated in US emergency departments between 1998 and 2005. Based on a national stratified probability sample of US hospitals with 24 hr emergency services, NEISS-Work allows calculation of national injury estimates. Over the 8-year period between 1998 and 2005, we estimated 786,900 (95% CI 546,600-1,027,200) ED-treated tool- or equipment-related injuries identified by the primary or secondary source of injury code. These injuries accounted for a quarter of all ED-treated construction industry injuries. Although over 100 different tools or pieces of equipment were responsible for these injuries, seven were responsible for over 65% of the injury burden: ladders, nail guns, power saws, hammers, knives, power drills, and welding tools in decreasing order. Current injury estimates and their severity, marked by the proportion of cases that were not released after ED treatment, indicate interventions are particularly needed to prevent injuries associated with use of ladders as well as nail guns and power saws. Attention should focus on design and guarding to more efficiently prevent these injuries rather than simply calling for the training of workers in how to safely use a dangerous tool or piece of equipment. 2010 Wiley-Liss, Inc.

  17. Construction cost impacts related to manpower, material, and equipment factors in contractor firms perspective

    Science.gov (United States)

    Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad

    2017-11-01

    Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.

  18. Semiconductor Manufacturing equipment introduction

    International Nuclear Information System (INIS)

    Im, Jong Sun

    2001-02-01

    This book deals with semiconductor manufacturing equipment. It is comprised of nine chapters, which are manufacturing process of semiconductor device, history of semiconductor manufacturing equipment, kinds and role of semiconductor manufacturing equipment, construction and method of semiconductor manufacturing equipment, introduction of various semiconductor manufacturing equipment, spots of semiconductor manufacturing, technical elements of semiconductor manufacturing equipment, road map of technology of semiconductor manufacturing equipment and semiconductor manufacturing equipment in the 21st century.

  19. Procurement of novel microanalysis equipment for construction materials.

    Science.gov (United States)

    2012-02-01

    The equipment procured (i.e. an Orbis micro X-ray Fluorescence (MXRF) and an APSEX personal Scanning Electron Microscope (PSEM)) is part of the next generation of micro analytical equipment. These tools have the ability to make large volumes of...

  20. Chapter 12. Space Heating Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rafferty, Kevin D.

    1998-01-01

    The performance evaluation of space heating equipment for a geothermal application is generally considered from either of two perspectives: (a) selecting equipment for installation in new construction, or (b) evaluating the performance and retrofit requirements of an existing system. With regard to new construction, the procedure is relatively straightforward. Once the heating requirements are determined, the process need only involve the selection of appropriately sized hot water heating equipment based on the available water temperature. It is important to remember that space heating equipment for geothermal applications is the same equipment used in non-geothermal applications. What makes geothermal applications unique is that the equipment is generally applied at temperatures and flow rates that depart significantly from traditional heating system design. This chapter presents general considerations for the performance of heating equipment at non-standard temperature and flow conditions, retrofit of existing systems, and aspects of domestic hot water heating.

  1. Equipment for hydraulic testing

    International Nuclear Information System (INIS)

    Jacobsson, L.; Norlander, H.

    1981-07-01

    Hydraulic testing in boreholes is one major task of the hydrogeological program in the Stripa Project. A new testing equipment for this purpose was constructed. It consists of a downhole part and a surface part. The downhole part consists of two packers enclosing two test-sections when inflated; one between the packers and one between the bottom packer and the bottom of the borehole. A probe for downhole electronics is also included in the downhole equipment together with electrical cable and nylon tubing. In order to perform shut-in and pulse tests with high accuracy a surface controlled downhole valve was constructed. The surface equipment consists of the data acquisition system, transducer amplifier and surface gauges. In the report detailed descriptions of each component in the whole testing equipment are given. (Auth.)

  2. Use of Personal Protective Equipment among Building Construction Workers in Kampala, Uganda

    Directory of Open Access Journals (Sweden)

    Jonathan Izudi

    2017-01-01

    Full Text Available Background. 270 million workplace accidents occur annually. In Uganda, Kampala district has the highest workplace injury and fatality rates. However, information on personal protective equipment (PPE—hand gloves, hardhats, overalls, safety boots, earplugs, safety harness with lanyard, and face shields—utilization among building construction workers remains scarce. We assessed PPE utilization and determinants among building construction workers in Kampala, Uganda. Methods. This cross-sectional study involved 385 respondents. Data collected by structured questionnaire was double-entered in EpiData and analyzed in STATA at 5% significance level. Independent determinants of PPE use were established by a stepwise backward logistic regression analysis. Results. 305 (79.2% respondents were males, 290 (75.3% were 18–30 years, 285 (74.0% completed secondary education, and 197 (51.2% were temporary employees. 60 (15.6% respondents used PPE. Female sex (adjusted odds ratio (AOR = 6.64; 95% CI: 1.55–28.46; P=0.011, temporary (AOR = 0.05; 95% CI: 0.01–0.27; P<0.001 and casual (AOR = 0.01; 95% CI: 0.001–0.071; P<0.001 employment, and previous knowledge of safety measures (AOR = 100.72; 95% CI: 26.00–390.16; P<0.001 were associated with PPE use. Conclusion. PPE use was low in Kampala, Uganda. Building construction companies should implement measures of the Uganda Occupational Health and Safety Act.

  3. 23 CFR 635.106 - Use of publicly owned equipment.

    Science.gov (United States)

    2010-04-01

    ... CONSTRUCTION AND MAINTENANCE Contract Procedures § 635.106 Use of publicly owned equipment. (a) Publicly owned equipment should not normally compete with privately owned equipment on a project to be let to contract... publicly owned equipment is to be made available in connection with construction work to be let to contract...

  4. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  5. 7 CFR 1753.68 - Purchasing special equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Purchasing special equipment. 1753.68 Section 1753.68... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of Special Equipment § 1753.68 Purchasing special equipment. (a) General. (1) Equipment purchases are...

  6. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and Other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA)

    Science.gov (United States)

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  7. Nuclear power equipment procurement management under EPC mode

    International Nuclear Information System (INIS)

    Shuai Yuezhi

    2014-01-01

    Nuclear power equipment procurement is one of the major constraints and management difficulties in the process of domestic nuclear power project construction for a long time. The construction of Hainan Changjiang Project can not meet the milestones due to the major equipment supply delay. Through the introduction to the organization and features of Changjiang project equipment procurement under EPC mode, and the main problems in the procurement process and its reason analysis, the purpose of this paper is to put forward ideas and suggestions of these items, i.e. selection of equipment suppliers, equipment localization, mass material design and procurement, complete system equipment supply, spare parts delivery and storage, owner process management, providing reference for follow-up projects. (author)

  8. Arctic pipeline planning design, construction, and equipment

    CERN Document Server

    Singh, Ramesh

    2013-01-01

    Utilize the most recent developments to combat challenges such as ice mechanics. The perfect companion for engineers wishing to learn state-of-the-art methods or further develop their knowledge of best practice techniques, Arctic Pipeline Planning provides a working knowledge of the technology and techniques for laying pipelines in the coldest regions of the world. Arctic Pipeline Planning provides must-have elements that can be utilized through all phases of arctic pipeline planning and construction. This includes information on how to: Solve challenges in designing arctic pipelines Protect pipelines from everyday threats such as ice gouging and permafrost Maintain safety and communication for construction workers while supporting typical codes and standards Covers such issues as land survey, trenching or above ground, environmental impact of construction Provides on-site problem-solving techniques utilized through all phases of arctic pipeline planning and construction Is packed with easy-to-read and under...

  9. Design, construction and testing of replacement nuclear coolant pump stators to meet today's equipment reliability expectations

    International Nuclear Information System (INIS)

    Fostier, L.; Howell, D.

    2005-01-01

    The reliability expectations of equipment and components in today's nuclear power plant are much greater than three or more decades ago when nuclear plants were first constructed due to economic impact of a failure. Very few components in a pressurized water reactor plant can have as much impact of the plants capacity factor as a catastrophic failure of a reactor coolant pump winding. This paper describes the maintenance approach taken by one North American utility in attempt to preclude such failures. The paper will discuss the challenges of the reactor coolant pump application and the enhancements made in the winding design and construction by the supplier to address failure mechanisms so as to better meet present reliability expectations in accordance with dedicated specifications. The paper will also present the in-process and final testing requirements and limits imposed in an attempt to ensure quality of the machine windings, along with selected test results from the stators that have been designed and constructed to these specifications to date. (author)

  10. Construction of a model of the process of accumulation of radionuclides of corrosion products on the equipment in nuclear power plants with boiling-water reactors

    International Nuclear Information System (INIS)

    Tevlin, S.A.

    1985-01-01

    This paper addresses the problem of corrosion of the structural materials of the reactor loop. This problem can be solved by constructing physical models of the process of accumulation of radionuclides on the equipment at nuclear power plants and by constructing the analytical apparatus for describing them. These models are presented here, and allow the analyzing of the effect of separate states and thermophysical factors, determination of the basic factors, and the ability to foresee in timely fashion the water state and structural measures required to lower the rate of growth and to decrease the amount of radionuclides deposited on the equipment in the nuclear power plant

  11. Construction and installation of the experimental marine equipment for recovery of rare metals in seawater

    Energy Technology Data Exchange (ETDEWEB)

    Hasegawa, Shin; Seko, Noriaki [Japan Atomic Energy Research Inst., Takasaki, Gunma (Japan). Takasaki Radiation Chemistry Research Establishment; Tabata, Kokichi [Mitsui Engineering and Shipbuiding Co., Ltd., Tokyo (Japan); and others

    2001-03-01

    An experimental marine equipment was designed and constructed to evaluate a fibrous polymer adsorbent prepared with radiation-processing and to extract the technical tasks in the step to the utilization of the rare metals recovery in seawater. The equipment was set in the offing of Mutsu-Sekine in Aomori prefecture. The scale of this equipment is capable of recovering 1 kg uranium in seawater by dipping the adsorbents by 6 times into the sea for 30 days per one dipping. The adsorbents, packed in metal wire cages, were hung down from a fish preserve-shaped float (floating steel frame). This float capacity was designed that the floating steel frame was sunk when wave height becomes high in order to reduce the tension of the ropes. The safety of the rope was evaluated by using design wave height 4.3 m and maximum wave height 7.3 m derived from 10 years' probability wave height. The safety factors obtained were 6.4 for the design wave height and 3.7 for the maximum wave height. The floating steel frame and the adsorbent cage were designed to maintain the mechanical strength under the maximum wave height. The weight of four anchor blocks are 40 tons enough to moor the floating steel frame. In the setting of the marine equipment, the floating steel frame connected with the anchor blocks by rope was put down on the bottom of the sea. The adsorbent cage was hung in the center of the floating steel frame. The characteristic test was carried out by packing adsorbents into adsorbent cage and dipping them for 20 days into the sea. There was no serious problem in the floating steel frame, the adsorbent cage, and the ropes and their knots. (author)

  12. Construction and installation of the experimental marine equipment for recovery of rare metals in seawater

    Energy Technology Data Exchange (ETDEWEB)

    Hasegawa, Shin; Seko, Noriaki [Japan Atomic Energy Research Inst., Takasaki, Gunma (Japan). Takasaki Radiation Chemistry Research Establishment; Tabata, Kokichi [Mitsui Engineering and Shipbuiding Co., Ltd., Tokyo (Japan)] [and others

    2001-03-01

    An experimental marine equipment was designed and constructed to evaluate a fibrous polymer adsorbent prepared with radiation-processing and to extract the technical tasks in the step to the utilization of the rare metals recovery in seawater. The equipment was set in the offing of Mutsu-Sekine in Aomori prefecture. The scale of this equipment is capable of recovering 1 kg uranium in seawater by dipping the adsorbents by 6 times into the sea for 30 days per one dipping. The adsorbents, packed in metal wire cages, were hung down from a fish preserve-shaped float (floating steel frame). This float capacity was designed that the floating steel frame was sunk when wave height becomes high in order to reduce the tension of the ropes. The safety of the rope was evaluated by using design wave height 4.3 m and maximum wave height 7.3 m derived from 10 years' probability wave height. The safety factors obtained were 6.4 for the design wave height and 3.7 for the maximum wave height. The floating steel frame and the adsorbent cage were designed to maintain the mechanical strength under the maximum wave height. The weight of four anchor blocks are 40 tons enough to moor the floating steel frame. In the setting of the marine equipment, the floating steel frame connected with the anchor blocks by rope was put down on the bottom of the sea. The adsorbent cage was hung in the center of the floating steel frame. The characteristic test was carried out by packing adsorbents into adsorbent cage and dipping them for 20 days into the sea. There was no serious problem in the floating steel frame, the adsorbent cage, and the ropes and their knots. (author)

  13. Sample-related peripheral equipment at IPNS

    International Nuclear Information System (INIS)

    Bohringer, D.E.; Crawford, R.K.

    1985-01-01

    This paper describes samples environment equipment provided by IPNS to visiting users and staff scientists. Of the twelve horizontal neutron beam stations, (ten now operational, two under construction) all use one or more form of such support equipment. An in-house support group devotes a significant fraction of its time to development, calibration, and maintenance of this equipment

  14. 46 CFR 161.012-7 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 161.012-7 Section 161.012-7 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ELECTRICAL EQUIPMENT Personal Flotation Device Lights § 161.012-7 Construction. (a...

  15. 46 CFR 160.174-9 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.174-9 Section 160.174-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Thermal Protective Aids § 160.174-9 Construction. (a) General...

  16. 46 CFR 160.171-9 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.171-9 Section 160.171-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Immersion Suits § 160.171-9 Construction. (a) General. Each...

  17. 46 CFR 160.042-3 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.042-3 Section 160.042-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Skids, Liferaft, for Merchant Vessels § 160.042-3 Construction...

  18. 46 CFR 160.176-9 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.176-9 Section 160.176-9 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Inflatable Lifejackets § 160.176-9 Construction. (a) General...

  19. Life Cycle Inventory (LCI) Data-Treatment Chemicals, Construction Materials, Transportation, On-site Equipment, and other Processes for Use in Spreadsheets for Environmental Footprint Analysis (SEFA): Revised Addition

    Science.gov (United States)

    This report estimates environmental emission factors (EmF) for key chemicals, construction and treatment materials, transportation/on-site equipment, and other processes used at remediation sites. The basis for chemical, construction, and treatment material EmFs is life cycle inv...

  20. 46 CFR 160.056-2 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.056-2 Section 160.056-2 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Rescue Boat § 160.056-2 Construction. (a) General. Rescue boats...

  1. 46 CFR 160.017-13 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.017-13 Section 160.017-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Chain Ladder § 160.017-13 Construction. (a) General. Each chain...

  2. Evaluating the emissions from heavy-duty construction equipment.

    Science.gov (United States)

    2008-12-01

    Gaseous and particle emissions from construction engines are an important fraction of the total air pollutants and are gaining increasing : regulatory attention. Quantification of NOx and PM is necessary to inventory the contribution of the construct...

  3. Developing equipment for AGR remote visual inspection

    International Nuclear Information System (INIS)

    James, P.W.; Walton, P.J.

    1985-01-01

    The Remote Inspection Group is part of the CEGB's Generation Development and Construction Division, and has responsibility for the design, development, procurement, testing and setting to work of the equipment provided to carry out routine remote visual inspections of its AGRs. This equipment includes both the viewing devices and the necessary placement equipment. (author)

  4. Construction of experience feedback system for equipment supervision in nuclear engineering

    International Nuclear Information System (INIS)

    Zou Pingguo; Zhang Liying; Zhang Wenzhong

    2009-01-01

    Based on the analysis of the experience sources on equipment supervision in nuclear engineering, the details of the organization principle, working flow, and report requirement for the experience feedback system are introduced. The function range and its roll in the experience feedback system of the nuclear authority, nuclear power plant owners and equipment supervision organizations are illustrated. The standardization working requirements in the information gathering, analyzing, feedback and tracking process, and the characteristics and form of the incident report and feedback report are proposed. It emphasizes that the method for combined analysis of one significant incident and the whole incidents shall be adopted in the information analysis, and the experience feedback shall be considered in the development of equipment supervision technique and the equipment manufacturing, thus to maximize the use of experience feedback information to improve the pertinency and effectiveness of the experience feedback system. (authors)

  5. Lunar construction/mining equipment

    Science.gov (United States)

    Ozdemir, Levent

    1990-01-01

    For centuries, mining has utilized drill and blast as the primary method of rock excavation. Although this technique has undergone significant improvements, it still remains a cyclic, labor intensive operation with inherent safety hazards. Other drawbacks include damage to the surrounding ground, creation of blast vibrations, rough excavation walls resulting in increased ventilation requirements, and the lack of selective mining ability. Perhaps the most important shortcoming of drill and blast is that it is not conducive to full implementation of automation or robotics technologies. Numerous attempts have been made in the past to automate drill and blast operations to remove personnel from the hazardous work environment. Although most of the concepts devised look promising on paper, none of them was found workable on a sustained production basis. In particular, the problem of serious damage to equipment during the blasting cycle could not be resolved regardless of the amount of charge used in excavation. Since drill and blast is not capable of meeting the requirements of a fully automated rock fragmentation method, its role is bound to gradually decrease. Mechanical excavation, in contrast, is highly suitable to automation because it is a continuous process and does not involve any explosives. Many of the basic principles and trends controlling the design of an earth-based mechanical excavator will hold in an extraterrestrial environment such as on the lunar surface. However, the economic and physical limitations for transporting materials to space will require major rethinking of these machines. In concept, then, a lunar mechanical excavator will look and perform significantly different from one designed for use here on earth. This viewgraph presentation gives an overview of such mechanical excavator systems.

  6. 21 CFR 1250.67 - Watering equipment.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Watering equipment. 1250.67 Section 1250.67 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... of drinking water or other beverages, or for food preservation purposes, equipment constructed so as...

  7. Maintenance and fabrication of nuclear electronic equipment

    International Nuclear Information System (INIS)

    Hong, Seok Boong; Chung, Chong Eun; Hwang, In Koo; Koo, In Soo; Park, Bum; Kim, Soo Hee; Lee, Seong Joo; Kim, Min Seok; Choi, Wha Lim

    2011-12-01

    - process equipment at PIEF, Chemical Analysis Team and RWFTF have been calibrated. - The electronic equipment and radiation equipment at RWTF and PIEF have been prepared. - Development and installation of integrated RMS software for Hanaro Cold Neutron Laboratory Building(CNLB) RMS, and development and performance upgrade of a portal monitor for CNLB. - Performance test of the Hardware/Software of digital unit controller has been performed, and functional upgrade of the Hardware/Software of stimulator for SMART MMIS performance test facility has also been performed. - A controller of high voltage power supply for a small electron beam generator and a controller for razer pinning and a remote monitoring apparatus of cathode power supply for a 0.2 Mev. small electron beam generator have been designed and fabricated. - Database construction for effective maintenance for the process equipment and radiation instruments are designed and constructed

  8. 7 CFR 58.419 - Curd mill and miscellaneous equipment.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Curd mill and miscellaneous equipment. 58.419 Section... Service 1 Equipment and Utensils § 58.419 Curd mill and miscellaneous equipment. Knives, hand rakes... of the curd mill should be of stainless steel. All pieces of equipment shall be so constructed that...

  9. Construction labor productivity during nuclear power plant construction

    International Nuclear Information System (INIS)

    Murray, W.B.

    1980-01-01

    This paper discusses the three different types of productivity programs used at the Wm. H. Zimmer Nuclear Power Station construction site. The Standard Cost Estimate as Productivity Measurement compares actual units installed to estimated units. The Manpower and Equipment Utilization Study measures the present utilization level of the construction work force, identifies opportunities for productivity improvement, and establishes a data base against which future improvements could be made. The special productivity program is a specialized and detailed study of first line supervision. Productivity is defined as the degree of efficiency attained in the use of labor, professional and management skills and knowledge, materials and equipment, and time and money to produce an end result. It is concluded that a more consistent system of productivity measurements needs to be developed and promoted for general use in the construction industry

  10. An examination of fuel consumption trends in construction projects

    International Nuclear Information System (INIS)

    Peters, Valerie A.; Manley, Dawn K.

    2012-01-01

    Recent estimates of fuel consumption in construction projects are highly variable. Lack of standards for reporting at both the equipment and project levels make it difficult to quantify the magnitude of fuel consumption and the associated opportunities for efficiency improvements in construction projects. In this study, we examined clusters of Environmental Impact Reports for seemingly similar construction projects in California. We observed that construction projects are not characterized consistently by task or equipment. We found wide variations in estimates for fuel use in terms of tasks, equipment, and overall projects, which may be attributed in part to inconsistencies in methodology and parameter ranges. Our analysis suggests that standardizing fuel consumption reporting and estimation methodologies for construction projects would enable quantification of opportunities for efficiency improvements at both the equipment and project levels. With increasing emphasis on reducing fossil fuel consumption, it will be important to quantify opportunities to increase fuel efficiency, including across the construction sector. - Highlights: ► An analysis of construction projects reveals inconsistencies in fuel use estimates. ► Fuel consumption estimates for similar construction equipment can vary greatly. ► Standards would help to quantify efficiency opportunities in construction.

  11. 46 CFR 160.062-3 - Materials, construction, workmanship, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, construction, workmanship, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Releases. Lifesaving Equipment, Hydraulic and Manual § 160.062-3 Materials, construction, workmanship, and performance...

  12. 46 CFR 160.031-3 - Materials, construction, workmanship, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, construction, workmanship, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Line-Throwing Appliance, Shoulder Gun Type (and Equipment) § 160.031-3 Materials, construction, workmanship, and...

  13. 46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, construction, workmanship, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Line-Throwing Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...

  14. RCC-E: Design and construction rules for electrical equipment of PWR nuclear islands

    International Nuclear Information System (INIS)

    2016-01-01

    RCC-E describes the rules for designing, building and installing electrical and I and C systems and equipment for pressurized water reactors. The code was drafted in partnership with industry, engineering firms, manufacturers, building control firms and operators, and represents a collection of best practices in accordance with IAEA requirements and IEC standards. The code's scope covers: architecture and the associated systems, materials engineering and the qualification procedure for normal and accidental environmental conditions, facility engineering and management of common cause failures (electrical and I and C) and electromagnetic interference, testing and inspecting electrical characteristics, quality assurance requirements supplementing ISO 9001 and activity monitoring. Use: RCC-E has been used to build the following power plants: France's last 12 nuclear units (1,300 MWe (8) and 1,450 MWe (4)), 2 M310 reactors in Korea (2), 44 M310 (4), CPR-1000 (28), CPR-600 (6), HPR-1000 (4) and EPR (2) reactors in service or undergoing construction in China, 1 EPR reactor in France. RCC-E is used for maintenance operations in French power plants (58 units) and Chinese M310 and CPR-1000 power plants. RCC-E has been chosen for the construction of the EPR plants in Hinkley Point, UK. Contents of the 2016 edition of the RCC-E code: Volume 1 - General requirements and quality assurance; Volume 2 - Specification of requirements; Volume 3 - I and C systems; Volume 4 - Electrical systems; Volume 5 - Materials engineering; Volume 6 - Installation of electrical and I and C systems; Volume 7 - Inspection and test methods

  15. Storage options for Long Length Contaminated Equipment (LLCE) items

    International Nuclear Information System (INIS)

    Hodgson, R.D.

    1994-11-01

    A review of the Washington state requirements for the storage of long equipment items removed from tanks indicate that if the contaminated materials on the long equipment items are analyzed and determined to be DW, and not EHW, the containers can be stored on an uncovered, RCRA approved, storage pad. Long equipment items contaminated with reportable levels of EHW, or suspected of being contaminated with EHW, must be protected from the elements by means of a building or other protective covering that otherwise allows adequate inspection of the containers. Storage of the long equipment item containers on an uncovered storage pad is recommended and will reduce construction costs for new storage by an estimated 60 percent when compared to construction costs for enclosed storage

  16. Hoisting appliances and fuel handling equipment at nuclear facilities

    International Nuclear Information System (INIS)

    1987-01-01

    The guide is followed by the Finnish Centre for Radiation and Nuclear Safety (STUK) in regulating hoisting and handling equipment Class 3 at nuclear facilities. The guide is applied e.g. to the following equipment: reactor building overhead cranes, hoisting appliances at nuclear fuel storages, fuel handling machines, other hoisting appliances, which because of nuclear safety aspects are classified in Safety Class 3, and load-bearing devices connected with the above equipment, such as replaceable hoisting tools and auxiliary lifting devices. The regulating of hoisting and handling equipment comprises the following stages: handling of preliminary and final safety analysis reports, inspection of the construction plan, supervision of fabrication and construction inspection, and supervision of initial start-up and commissioning inspection

  17. 47 CFR 2.925 - Identification of equipment.

    Science.gov (United States)

    2010-10-01

    ... common enclosure, but constructed on separate sub-units or circuit boards with independent frequency... grant of equipment authorization. (e) A software defined radio may be equipped with a means such as a... implanted within the body of a test animal or person would probably require an alternate method of...

  18. 46 CFR 169.685 - Electric heating and cooking equipment.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Electric heating and cooking equipment. 169.685 Section... More on Vessels of Less Than 100 Gross Tons § 169.685 Electric heating and cooking equipment. (a) Each...) All electric cooking equipment, attachments, and devices, must be of rugged construction and so...

  19. Construction of an analytic-realistic phantom for adaptation of the radiographic techniques in any conventional X-ray equipment

    International Nuclear Information System (INIS)

    Pina, D.R.; Ghilardi Netto, T.; Trad, C.S.; Brochi, M.A. Corte; Duarte, S.B.; Pina, S.R.

    2001-01-01

    In the present work we construct a homogeneous phantom, for calibrating the X-ray beam. Each homogeneous phantom was used in the time-scale sensitometric method for obtaining a radiographic technique which is able to produce in the film, an optical density around 1,0 higher than the density of base plus fog. These radiographic techniques were applied in a anthropomorphic phantom (Rando) and its images were analyzed by specialists in radiology. They identified the best image and then a ideal radiographic technique for a standard patient with smaller doses, at any conventional X-ray equipment. (author)

  20. Protecting electrical equipment against dust explosions

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, J

    1981-07-01

    The new ordinance on electrical equipment in hazardous areas and the new VDE 0165/6.80 have brought about significant changes in the field of electrical equipment in areas with a explosion hazard due inflammable dust. There are no constructional regulations yet in this field, and producers, planners, and users are uncertain about what measures to take. The article attempts to clear up a few points.

  1. Requirements for industrial x-ray equipment

    International Nuclear Information System (INIS)

    1987-01-01

    This safety code is concerned with the protection of all individuals who may be exposed to radiation emitted by X-ray equipment operating at energies up to 1 MeV as used in industrial radiography. This code presents basic radiation safety information for the protection of personnel operating and servicing X-ray equipment and other workers and the general public in the vicinity of areas where X-ray equipment is in operation. It specifies general safety features of design, construction and functioning of X-ray equipment and facilities; describes the responsibilities of the user, operator and maintenance personnel; contains recommendations to ensure that the X-ray equipment is used and maintained in accordance with the ALARA principle; and describes a program of personnel monitoring and radiation safety surveys. ( 6 refs., 5 tabs., 4 figs.)

  2. 30 CFR 18.51 - Electrical protection of circuits and equipment.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electrical protection of circuits and equipment... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.51 Electrical protection of circuits and equipment. (a) An automatic...

  3. 30 CFR 18.21 - Machines equipped with powered dust collectors.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Machines equipped with powered dust collectors... TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.21 Machines equipped with powered dust collectors. Powered dust...

  4. Utility equipment systems: promising more for less

    Energy Technology Data Exchange (ETDEWEB)

    1987-10-01

    This paper discusses current developments in utility equipment systems, a term applied to carrier vehicles, mostly evolved from well-known forms of construction or mining equipment modified to work with a variety of different front or back end attachments. One of the equipment ranges discussed is the Normet cassette system produced by the Orion corporation of Finland, which allows a basic chassis to be converted from a personnel carrier to an ANFO carrier within minutes. LHD vehicles which are being adapted to fulfil multipurpose roles, such as carrying roof supports, chocks and other heavy mining equipment underground are also discussed. 5 figs.

  5. 46 CFR 160.054-3 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.054-3 Section 160.054-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... Construction. (a) Construction. The container shall be constructed of tough transparent material, not less than...

  6. 7 CFR 58.626 - Packaging equipment.

    Science.gov (United States)

    2010-01-01

    ... containers with frozen desserts shall be constructed so that all product contact surfaces shall be of... Standards for Equipment for Packaging Frozen Desserts and Cottage Cheese. Quality Specifications for Raw...

  7. Financial Analysis for Replacement of Construction Equipment in Saudi Arabia

    Directory of Open Access Journals (Sweden)

    Ali Shash

    2012-11-01

    Full Text Available This study report results of a survey conducted in the EasternProvince of Saudi Arabia to explore the procedures and financialtechniques that large-size contractors utilise in replacingequipment. The results indicated that contractors set severalreplacement alternatives that they evaluate by using a set ofvarious qualitative and quantitative factors. The contractors’business objectives, employee safety and morale, and, contractors’image in the industry were found to be the most influentialqualitative factors affecting the decision of equipment replacement.Inflation, downtime, obsolescence, salvage value, and depreciationare among the top quantitative factors that contractors considerwhile making a decision to replace equipment. Because of theirsimplicity and practicality, the net present value, payback period,and the economic life are the most popular techniques that areutilised for analysing the financial issues of proposed replacementalternatives.

  8. Hoisting appliances and fuel handling equipment at nuclear facilities

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1988-12-31

    The guide is followed by the Finnish Centre for Radiation and Nuclear Safety (STUK) in regulating hoisting and handling equipment Class 3 at nuclear facilities. The guide is applied e.g. to the following equipment: reactor building overhead cranes, hoisting appliances at nuclear fuel storages, fuel handling machines, other hoisting appliances, which because of nuclear safety aspects are classified in Safety Class 3, and load-bearing devices connected with the above equipment, such as replaceable hoisting tools and auxiliary lifting devices. The regulating of hoisting and handling equipment comprises the following stages: handling of preliminary and final safety analysis reports, inspection of the construction plan, supervision of fabrication and construction inspection, and supervision of initial start-up and commissioning inspection. 36 refs. Translation. The original text is published under the same guide number. The guide is valid from 5 January 1987 and will be in force until further notice.

  9. Persuasion to use personal protective equipment in constructing subway stations: application of social marketing.

    Science.gov (United States)

    Shamsi, Mahmoud; Pariani, Abbas; Shams, Mohsen; Soleymani-nejad, Marzieh

    2016-04-01

    To study the effects of an intervention based on social marketing to persuade workers to use personal protective equipment (PPE) in constructing subway stations in Isfahan, Iran. This was a quasi-experimental study. Two stations were selected as intervention and control groups. Intervention was designed based on results of a formative research. A free package containing a safety helmet with a tailored message affixed to it, mask and gloves and an educational pamphlet was delivered to the intervention group. After 6 weeks, behaviours in the intervention and control stations were measured using an observational checklist. After the intervention, the percentage of workers who used PPE at the intervention station increased significantly. OR for helmet and mask usage was 7.009 and 2.235, respectively, in the intervention group. Social marketing can be used to persuade workers to use PPE in the workplace. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  10. 46 CFR 108.235 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Construction. 108.235 Section 108.235 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS DESIGN AND EQUIPMENT Construction and Arrangement Helicopter Facilities § 108.235 Construction. (a) Each helicopter deck must be...

  11. Development of remote automatic equipment for BWR power plants

    International Nuclear Information System (INIS)

    Sasaki, Masayoshi

    1984-01-01

    The development of remote control, automatic equipment for nuclear power stations has been promoted to raise the rate of operation of plants by shortening regular inspection period, to improve the safety and reliability of inspection and maintenance works by mechanization, to reduce the radiation exposure dose of workers and to reduce the manpower required for works. The taking-off of control rod drives from reactors and fixing again have been mechanized, but the disassembling, cleaning, inspection and assembling of control rod drives are manually carried out. Therefore, Hitachi Ltd. has exerted effort to develop the automatic equipment for this purpose. The target of development, investigation, the construction and function of the equipment, the performance and the effect of adopting it are reported. The equipment for the volume reduction of spent fuel channel boxes and spent control rods is developed since these are major high level radioactive solid wastes, and their apparent volume is large. Also the target of development, investigated things, the construction and function of the equipment, the performance and the effect of adopting it are reported. (Kako, I.)

  12. Nuclear power plant containment construction

    International Nuclear Information System (INIS)

    Schabert, H.P.; Danisch, R.; Strickroth, E.

    1975-01-01

    The Nuclear Power Plant Containment Construction includes the spherical steel safety enclosure for the reactor and the equipment associated with the reactor and requiring this type of enclosure. This steel enclosure is externally structurally protected against accident by a concrete construction providing a foundation for the steel enclosure and having a cylindrical wall and a hemispherical dome, these parts being dimensioned to form an annular space surrounding the spherical steel enclosure, the latter and the concrete construction heretofore being concentrically arranged with respect to each other. In the disclosed construction the two parts are arranged with their vertical axis horizontally offset from each other so that opposite to the offsetting direction of the concrete construction a relatively large space is formed in the now asymmetrical annular space in which reactor auxiliary equipment not requiring enclosure by the steel containment vessel or safety enclosure, may be located outside of the steel containment vessel and inside of the concrete construction where it is structurally protected by the latter

  13. 46 CFR 160.057-3 - Materials, workmanship, construction, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, construction, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Floating Orange Smoke Distress Signals (15 Minutes) § 160.057-3 Materials, workmanship, construction, and performance...

  14. 46 CFR 160.037-3 - Materials, workmanship, construction, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, construction, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand Orange Smoke Distress Signals § 160.037-3 Materials, workmanship, construction, and performance requirements. (a...

  15. 46 CFR 160.036-3 - Materials, workmanship, construction and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, construction and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand-Held Rocket-Propelled Parachute Red Flare Distress Signals § 160.036-3 Materials, workmanship, construction and...

  16. 46 CFR 160.024-3 - Materials, workmanship, construction, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, construction, and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Pistol-Projected Parachute Red Flare Distress Signals § 160.024-3 Materials, workmanship, construction, and performance...

  17. 46 CFR 160.058-3 - Materials, workmanship, construction and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, construction and performance...) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Desalter Kits, Sea Water, for Merchant Vessels § 160.058-3 Materials, workmanship, construction and performance...

  18. Lifetime of Mechanical Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Leland, K.

    1999-07-01

    The gas plant at Kaarstoe was built as part of the Statpipe gas transport system and went on stream in 1985. In 1993 another line was routed from the Sleipner field to carry condensate, and the plant was extended accordingly. Today heavy additional supply- and export lines are under construction, and the plant is extended more than ever. The main role of the factory is to separate the raw gas into commercial products and to pump or ship it to the markets. The site covers a large number of well-known mechanical equipment. This presentation deals with piping, mechanical and structural disciplines. The lifetime of mechanical equipment is often difficult to predict as it depends on many factors, and the subject is complex. Mechanical equipment has been kept in-house, which provides detailed knowledge of the stages from a new to a 14 years old plant. The production regularity has always been very high, as required. The standard of the equipment is well kept, support systems are efficient, and human improvisation is extremely valuable.

  19. Interventional suite and equipment management: cradle to grave

    Energy Technology Data Exchange (ETDEWEB)

    Strauss, Keith J. [Harvard Medical School, Radiology Physics and Engineering, Children' s Hospital Boston, Boston, MA (United States)

    2006-09-15

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  20. Interventional suite and equipment management: cradle to grave

    International Nuclear Information System (INIS)

    Strauss, Keith J.

    2006-01-01

    The acquisition process for interventional equipment and the care that this equipment receives constitute a comprehensive quality improvement program. This program strives to (a) achieve the production of good image quality that meets clinical needs, (b) reduce radiation doses to the patient and personnel to their lowest possible levels, and (c) provide overall good patient care at reduced cost. Interventional imaging equipment is only as effective and efficient as its supporting facility. The acquisition process of interventional equipment and the development of its environment demand a clinical project leader who can effectively coordinate the efforts of the many professionals who must communicate and work effectively on this type of project. The clinical project leader needs to understand (a) clinical needs of the end users, (b) how to justify the cost of the project, (c) the technical needs of the imaging and all associated equipment, (d) building and construction limitations, (e) how to effectively read construction drawings, and (f) how to negotiate and contract the imaging equipment from the appropriate vendor. After the initial commissioning of the equipment, it must not be forgotten. The capabilities designed into the imaging device can be properly utilized only by well-trained operators and staff who were initially properly trained and receive ongoing training concerning the latest clinical techniques throughout the equipment's lifetime. A comprehensive, ongoing maintenance and repair program is paramount to reducing costly downtime of the imaging device. A planned periodic maintenance program can identify and eliminate problems with the imaging device before these problems negatively impact patient care. (orig.)

  1. Ion beam stabilization in ion implantation equipment

    International Nuclear Information System (INIS)

    Pina, L.

    1973-01-01

    The results are presented of experimental efforts aimed at ion beam current stabilization in an equipment for ion implantation in solids. The related problems of power supplies are discussed. Measured characteristics of laboratory equipment served the determination of the parameters to be required of the supplies as well as the design and the construction of the supplies. The respective wiring diagram is presented. (J.K.)

  2. Qualification of electric equipments for nuclear power plants

    International Nuclear Information System (INIS)

    Chauvin, G.; Raimondo, E.

    1983-03-01

    Description of the testing equipment, testing methods and standards of the resistance to seisms of electrical equipments (switches, pump motors, electrovalves, ...) for electronuclear power plants in France. Presentation of the French design and construction rules for electrical devices in the domestic and export nuclear market (resistance to thermodynamical and chemical stresses, to seisms, etc...) [fr

  3. Automotive and Construction Equipment for Arctic Use, Materials Problems

    Science.gov (United States)

    1991-11-01

    followed. Nitrile rubber ( NBR ) is one of the most common materials used in seal manufacture. It is a copolymer of butadiene and acrylonitrile and is... rubber and other elastomers, and many plastics. This problem is exacerbated, especially in equipment with diesel engines, because the engines run...their original condition in a short time on removal of the stress. The group includes natural rubbers as well as synthetic polymers. Many of these

  4. Increasing the Usage of Personal Protective Equipments in Constructing Subway Stations: An Application of Social Marketing Model

    Directory of Open Access Journals (Sweden)

    M Shams

    2013-10-01

    Full Text Available Abstract Background & aim: Although the relationship between the use of personal protective equipment and the reduction of workplace injuries is well-known the use of these devices during operation by the staff is not so desirable. This study was based on a model of social marketing interventions to increase the use of safety devices and personal protection on the subway-station staff. Methods: The present quasi-experimental study was based on the results of a formative research consisted of a qualitative (exploring employees’ views through focus group discussions and a quantitative study (measuring attitudes and behaviors by questionnaire and checklist. Based on the formative research findings, a free package includes a helmet with a label containing the message, an anti-cut safety gloves, a dust mask, and an educational pamphlet were delivered to intervention group. After four weeks, the check list of observational behaviors in two constructing stations was completed and the results were compared with before intervention. The data were analyzed by paired t-test, t-test and logistic regression. Results: Three common behaviors were observed among staff not using caps, masks and gloves. The odds ratio for helmet and mask usage in the intervention group was more than other groups. After the intervention, the use of safety helmets and masks significantly increased (p < 0.05. The odds ratio for the use of helmets and masks after intervention in the intervention group was significantly higher than other groups (p < 0.05. Conclusion: The experimental basis of the safety devices and personal protection needs and demands of the audience, material and immaterial costs of the equipment, supplies, and promoting their use in the right place, can encourage the staff to continuously use the safety devices at workplace. Key Words: Workplace, Injuries, Personal Protective Equipment, Social Marketing

  5. Construction Site Workers’ Awareness on Using Safety Equipment: Case Study

    OpenAIRE

    Ulang N. Md; Salim N. S.; Baharum F.; Agus Salim N.A.

    2014-01-01

    Construction sector is an important sector and contributed significantly to national development. However, this sector poses higher risk to accident. This is due to fact that construction site can be considered as a dangerous zone to workers and to the public. Due to the variety of cases occurs on site, the contractor will usually have to pay the cost related to accidents in the form of higher insurance premium. Despite various measures, accidents still occur at construction sites. Personal P...

  6. Strategy and implementation of resources control of key equipments in nuclear power plant

    International Nuclear Information System (INIS)

    Zha Qing

    2014-01-01

    The strategic resources of the construction of nuclear power plant, which include the main equipment of nuclear island, heavy forgings, the bottleneck equipment and strategic materials, is one of the key issues in the construction of nuclear power projects. The control of these strategic resources has become the focus of competition in industry and the major nuclear power groups are willing to fight for this huge advantages. The resource control strategies of key equipment of nuclear power projects are analyzed in this paper. This paper put forward specific measures and methods for the strategic resources control. By the application to a plurality of nuclear power engineering construction projects, these specific measures and methods achieved good results and will be with important guidance and reference for the construction of future nuclear power projects in China. (author)

  7. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment

    International Nuclear Information System (INIS)

    Nordling, Anna; Haakansson, Goeran

    2012-01-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  8. Turbidity monitoring equipment and methodology evaluation at MDOT construction sites.

    Science.gov (United States)

    2014-12-01

    State Study 261 is a continuation of State study 225, "Turbidity Monitoring at Select : MDOT Construction Sites", which was successful in establishing baseline stream data : at several active construction sites. State Study 261 focused on the equipme...

  9. Maintenance program guidelines for programmatic equipment

    International Nuclear Information System (INIS)

    1994-11-01

    The Division Directors at Lawrence Berkeley Laboratory are responsible for implementing a maintenance program for research equipment (also referred to as programmatic equipment) assigned to them. The program must allow maintenance to be accomplished in a manner that promotes operational safety, environmental protection and compliance, and cost effectiveness; that preserves the intended functions of the facilities and equipment; and that supports the programmatic mission of the Laboratory. Programmatic equipment -- such as accelerators, lasers, radiation detection equipment, and glove boxes -- is dedicated specifically to research. Installed equipment, by contrast, includes the mechanical and electrical systems installed as part of basic building construction, equipment essential to the normal functioning of the facility and its intended use. Examples of installed equipment are heating, ventilating, and air conditioning systems; elevators; and communications systems. The LBL Operating and Assurance Program Plan (PUB-3111, Revision 4) requires that a maintenance program be prepared for programmatic equipment and defines the basic maintenance program elements. Such a program of regular, documented maintenance is vital to the safety and quality of research activities. As a part of that support, this document offers guidance to Laboratory organizations for developing their maintenance programs. It clarifies the maintenance requirements of the Operating and Assurance Program (OAP) and presents an approach that, while not the only possibility, can be expected to produce an effective maintenance program for research equipment belonging to the Laboratory's organizations

  10. 46 CFR 160.002-4 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.002-4 Section 160.002-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and 5 § 160.002-4 Construction. (a) General. This specification covers life preservers which...

  11. 46 CFR 160.047-4 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.047-4 Section 160.047-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS... and Child § 160.047-4 Construction. (a) General. This specification covers buoyant vests which...

  12. Damage caused to houses and equipment by underground nuclear explosions; Degats dus aux explosions nucleaires souterraines sur les habitations et les equipements

    Energy Technology Data Exchange (ETDEWEB)

    Delort, F; Guerrini, C [Commissariat a l' Energie Atomique, Bruyeres-le-Chatel (France). Centre d' Etudes

    1969-07-01

    A description is given of the damaged caused to various structures, buildings, houses, mechanical equipment and electrical equipment by underground nuclear explosions in granite. For each type of equipment or building are given the limiting distances for a given degree of damage. These distances have been related to a parameter characterizing the movement of the medium; it is thus possible to generalize the results obtained in granite, for different media. The problem of estimating the damage caused at a greater distance from the explosion is considered. (authors) [French] Les degats sur diverses structures, constructions, habitations, equipements mecaniques et materiels electriques provoques par des explosions nucleaires souterraines dans le granite sont decrits. On a indique pour chaque type de materiel ou de construction, les distances limites correspondant a un degre de gravite de dommage observe. Ces distances ont ete reliees a un parametre caracterisant le mouvement du milieu, permettant ainsi de generaliser les resultats obtenus dans le granite, a differents milieux. Le probleme de la prevision des degats en zone lointaine a ete aborde. (auteurs)

  13. 30 CFR 18.22 - Boring-type machines equipped for auxiliary face ventilation.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Boring-type machines equipped for auxiliary..., DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Construction and Design Requirements § 18.22 Boring-type machines equipped for...

  14. 7 CFR 58.214 - General construction, repair and installation.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false General construction, repair and installation. 58.214... Service 1 Equipment and Utensils § 58.214 General construction, repair and installation. All equipment and utensils necessary to the manufacture of dry milk products, including pasteurizer, timing-pump or device...

  15. Pneumatic Muscle Actuated Rehabilitation Equipment of the Upper Limb Joints

    Science.gov (United States)

    Deaconescu dr. eng. habil., Andrea, Prof.

    2017-06-01

    Rehabilitation equipment of the upper limb joints holds a key role in passive physical therapy. Within this framework, the paper presents two such pieces of equipment developed for the rehabilitation of elbow and of wrist and knuckles, respectively. The presented and discussed equipment is actuated by pneumatic muscles, its benefits being a low cost, simple and robust construction, as well as short response time to commands.

  16. Methods for reduction of the period for construction and commissioning of NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2004-01-01

    The process of construction of NPP unit is associated with significant amount of engineering, civil construction works, equipment installation and testing works. In order to achieve better economical results from the point of view of the investor, it will be a benefit if the time period for construction and commissioning of the unit is reduced. In order to realize such reduction of the needed time it is possible to utilize some new approaches for installation of heavy equipment, utilization of prefabricated in advance composite modules of equipment and application of new types of construction equipment and techniques. In such way the commissioning period can be reduced, and high quality of the installation works can be achieved. (author)

  17. Electrical equipment design library

    International Nuclear Information System (INIS)

    1994-01-01

    This book guides the design supervision, construction order for electrical equipment. The contents of this library are let's use electricity like this, leading-in-pole and casual power, electric pole install below 300KVA, electric pole install below 301∼1000KVA, electric pole install exceed 1000KVA, rooftop install exceed 1000KVA, CUBICLE type, 154KV services. It adds an appendix.

  18. Construction, assembling and operation of an equipment for sodium purity

    International Nuclear Information System (INIS)

    Becquart, E.T.; Botbol, J.; Echenique, P.N.; Fruchtenicht, F.W.; Gil, D.A.; Perillo, P.; Vardich, R.N.; Vigo, D.E.

    1993-01-01

    The purpose of this work is the production of high purity metallic sodium for bench-scale, research studies. A stainless steel equipment was built and assembled, including high vacuum, heating and cooling systems. It was satisfactorily operated in two successive steps, filtration and vacuum distillation, with a good yield. (Author). 5 refs., 5 figs

  19. Retrieval of buried waste using conventional equipment

    International Nuclear Information System (INIS)

    Valentich, D.J.

    1994-01-01

    A field test was conducted to determine the effectiveness of using conventional type construction equipment for the retrieval of buried transuranic (TRU) waste. A cold (nonhazardous and nonradioactive test pit 841 m 3 in volume) was constructed with boxes and drums filled with simulated waste materials, such as metal, plastic, wood, concrete, and sludge. Large objects, including truck beds, vessels, vaults, pipes, and beams were also placed in the pit. These materials were intended to simulate the type of waste found in existing TRU buried waste pits and trenches. A series of commercially available equipment items, such as excavators and tracked loaders outfitted with different end effectors, were used to remove the simulated waste. Work was performed from both the abovegrade and belowgrade positions. During the demonstration, a number of observations, measurements, and analyses were performed to determine which equipment was the most effective in removing the waste. The retrieval rates for the various excavation techniques were recorded. The inherent dust control capabilities of the excavation methods used were also observed

  20. 46 CFR 160.005-4 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Construction. 160.005-4 Section 160.005-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS...), Models 52 and 56 § 160.005-4 Construction. (a) General. This specification covers life preservers which...

  1. The development of synthetic test procedure for hot cell equipment systems in IMEF

    International Nuclear Information System (INIS)

    Ahn, Sang Bok; Lee, Key Soon; Park, Dae Kyu; Hong, Kwon Pyo; Choo, Yong Sun

    1998-04-01

    Hot cell facility should be confirmed to operation safety through pre-commissioning test after construction. In this report, the detailed procedure of hot cell equipment are described. The contents are as follows: 1. Entrance equipment of hot cell 2. Specimen transportation equipment between hot cells 3. Waste discharge equipment in hot cell 4. Specimen loading equipment to hot cell 5. Interlinking equipment in hot cell. (author). 4 tabs

  2. SUBSURFACE CONSTRUCTION AND DEVELOPMENT ANALYSIS

    International Nuclear Information System (INIS)

    N.E. Kramer

    1998-01-01

    The purpose of this analysis is to identify appropriate construction methods and develop a feasible approach for construction and development of the repository subsurface facilities. The objective of this analysis is to support development of the subsurface repository layout for License Application (LA) design. The scope of the analysis for construction and development of the subsurface Repository facilities covers: (1) Excavation methods, including application of knowledge gained from construction of the Exploratory Studies Facility (ESF). (2) Muck removal from excavation headings to the surface. This task will examine ways of preventing interference with other subsurface construction activities. (3) The logistics and equipment for the construction and development rail haulage systems. (4) Impact of ground support installation on excavation and other construction activities. (5) Examination of how drift mapping will be accomplished. (6) Men and materials handling. (7) Installation and removal of construction utilities and ventilation systems. (8) Equipping and finishing of the emplacement drift mains and access ramps to fulfill waste emplacement operational needs. (9) Emplacement drift and access mains and ramps commissioning prior to handover for emplacement operations. (10) Examination of ways to structure the contracts for construction of the repository. (11) Discussion of different construction schemes and how to minimize the schedule risks implicit in those schemes. (12) Surface facilities needed for subsurface construction activities

  3. A cost-benefit analysis of tracking and tracing systems in road construction

    NARCIS (Netherlands)

    Voordijk, Johannes T.; Akintoye, A

    2001-01-01

    A major problem in road construction is the lack of timely and accurate information about the location and productivity of equipment. As a result, the productivity rate of certain types of construction equipment is low and equipment has to be hired in from third parties. Lack of co-ordination

  4. 46 CFR 151.40-5 - Construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Construction. 151.40-5 Section 151.40-5 Shipping COAST... LIQUID HAZARDOUS MATERIAL CARGOES Temperature or Pressure Control Installations § 151.40-5 Construction. Construction of machinery or equipment, such as heat exchangers, condensers, piping, etc., associated with...

  5. Construction of a supercritical fluid extraction (SFE equipment: validation using annatto and fennel and extract analysis by thin layer chromatography coupled to image

    Directory of Open Access Journals (Sweden)

    Júlio Cezar Flores JOHNER

    2016-01-01

    Full Text Available Abstract The present work describes setting up a laboratory unit for supercritical fluid extraction. In addition to its construction, a survey of cost was done to compare the cost of the homemade unit with that of commercial units. The equipment was validated using an extraction of annatto seeds’ oil, and the extraction and fractionation of fennel oil were used to validate the two separators; for both systems, the solvent was carbon dioxide. The chemical profiles of annatto and fennel extracts were assessed using thin layer chromatography; the images of the chromatographic plates were processed using the free ImageJ software. The cost survey showed that the homemade equipment has a very low cost (~US$ 16,000 compared to commercial equipment. The extraction curves of annatto were similar to those obtained in the literature (yield of 3.8% oil. The separators were validated, producing both a 2.5% fraction of fennel seed extract rich in essential oils and another extract fraction composed mainly of oleoresins. The ImageJ software proved to be a low-cost tool for obtaining an initial evaluation of the chemical profile of the extracts.

  6. 29 CFR 1926.957 - Construction in energized substations.

    Science.gov (United States)

    2010-07-01

    ... Distribution § 1926.957 Construction in energized substations. (a) Work near energized equipment facilities. (1... lines. When it is necessary to deenergize equipment or lines for protection of employees, the... large electrical equipment, transformers, or breakers. (f) Storage. The storage requirements of § 1926...

  7. 29 CFR 1926.95 - Criteria for personal protective equipment.

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION Personal Protective and Life... in a sanitary and reliable condition wherever it is necessary by reason of hazards of processes or... construction for the work to be performed. (d) Payment for protective equipment. (1) Except as provided by...

  8. Outline of new extra high voltage research equipment at Kumatori research laboratories

    Energy Technology Data Exchange (ETDEWEB)

    Hohki, S; Ikeda, G

    1965-01-01

    Following up the construction in 1939 of an ehv research laboratory, another new research laboratory was established at Kumatori with a ground area of 142,000 square meters. As the first stage of this construction plan, the new research equipment was installed in November 1963 and began operation. The laboratory consists of comprehensive ehv research equipment and facilities relating to atomic energy. The former includes a 6000-kV impulse voltage generator, a 1650-kV alternating current testing transformer, a 300-m overhead transmission test line, a tower strength testing facility, and other various high-power test facilities. Studies on a 400- to 500-kV overhead power transmission system and other new transmission systems are currently being conducted. The details of the construction of the ehv research equipment together with the research policy for future ehv engineering are given.

  9. Management of construction safety at RR site

    International Nuclear Information System (INIS)

    Pathak, B.C.; Khatsuriya, J.R.

    2016-01-01

    Construction industries are one of the most hazardous industries and hence, promotion of safety remains one of the greatest challenges facing construction industry today. According to ILO estimates: Each year at least 60,000 fatal accidents occur on construction sites around the world or one fatal accident every ten minutes. One in six fatal accidents at work occurs on a construction site. In industrialized countries, as many as 25-40 per cent of work related deaths occur on construction sites, even though the sector employs only 6-10 per cent of the workforce. The number of fatalities occurring from construction work in India is also quite disturbing. Though, the fall of person from height and through openings were the major causes for fatal /serious accidents, the risk of fatal accident involving material handling equipment, either during handling or its maintenance is also significantly high due to use of large number of material handling equipments during construction work. (author)

  10. Challenges and achievements - Prototype Fast Breeder Reactor construction

    International Nuclear Information System (INIS)

    Subramani, V.A.; Dhere, S.S.; Manoharan, V.; Subbaraman, P.

    2010-01-01

    Prototype fast breeder reactor presently under construction poses several challenges in materials, design and construction. The civil structure and equipment are of very large size and complex in nature. This paper presents the features of the design and construction of the PFBR excavation, raft, civil structure of the nuclear island connected buildings and reactor vault. This paper also brings out the details of the large size equipment of special stainless steel and handling structure for their lifting and placement inside the reactor vault. The paper is divided into three parts viz. introduction, challenges and achievements during construction of civil structures and erection of large size components. (author)

  11. Data-Driven Scenario Generation for Enhanced Realism of Equipment Training Simulators

    NARCIS (Netherlands)

    Vahdatikhaki, Faridaddin; Hammad, Amin; olde Scholtenhuis, Léon Luc; Miller, Seirgei Rosario; Makarov, Denis

    2017-01-01

    Improving the training of heavy equipment operators can make a significant contribution to improving the safety of construction sites. In recent years, Virtual Reality (VR)-based simulators have gained increased popularity for the use in equipment training programs. While VR training simulators for

  12. 46 CFR 160.023-3 - Materials, workmanship, construction, and performance requirements.

    Science.gov (United States)

    2010-10-01

    ... requirements. 160.023-3 Section 160.023-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Hand Combination... requirements. (a) The materials, construction, workmanship, general and detail requirements shall conform to...

  13. Evaluation of construction cost of pyro-partitioning plant

    International Nuclear Information System (INIS)

    Kinoshita, Kensuke; Kurata, Masateru; Inoue, Tadashi

    1999-01-01

    This study was conducted to evaluate the construction cost of a pyro-partitioning plant. The plant capacity was chosen to accommodate processing of the HLLW generated by PUREX reprocessing of 800 ton of spent LWR fuel. The block flow diagram and mass balance obtained from our previous experimental data were used to produce a detailed process-flow diagram and to design the plant. In this evaluation, the plant was estimated to cover an area of about 90 m x 70 m, and to cost $576 million for construction. This study shows that the cost of process equipments, such as reaction vessels, accountability tanks and so on, is just about 13% of total construction cost. On the other hand, the cost of process robots and the equipments for key measurement point (KMP) is major part in the cost of in-cell equipment. So it is clear that the construction cost can be reduced by reducing the number of material balance area (MBA) and KMP. (author)

  14. Establishment of nuclear equipment qualification system

    International Nuclear Information System (INIS)

    Joo, Po Kook; Lim, Nam Jin; Lee, Young Gun

    2003-04-01

    This study is carried out by KEARI(Korea Atomic Energy Research Institute) as the lead organization in cooperation with KIMM(Korea Institute of Machinery and Materials), KTL(Korea Testing Laboratory) and KRISS(Korea Research Institute of Standards and Science) to construct a basis of efficient management of nuclear equipment qualification business by expanding test equipment of each of participating organization, and developing qualification technologies. As for KIMM, control system of large scale shaker was replaced with advanced system, and LOCA(Loss of Coolant Accident) test facility was installed. KTL is now capable of conducting seismic tests of nuclear I and C as a result of installation of seismic test equipment during the first two project years. KRISS participated in the Project with a view to have large scale EMI test equipment and related technologies. In parallel with expansion of test equipment, a industrial-educational-research cooperation committee, as an intermediate step toward integrated equipment qualification system to maximize the usage of test equipment, was established and cooperation methods were investigated. As a result, Korea Nuclear Equipment Qualification Association, an corporate juridical person, was established. Research on development of thermal and radiation aging test technology of nuclear materials was carried out by Hanyang University and SECO(Saehan Engineering and Qualification Co., Ltd.). Integrated Equipment Qualification Database was developed which contains material test data, equipment qualification data and other EQ related informations. Standard qualification procedures were developed in order for test laboratories and manufacturers to establish design requirements and to efficiently perform tests

  15. Internet-based Interactive Construction Management Learning System.

    Science.gov (United States)

    Sawhney, Anil; Mund, Andre; Koczenasz, Jeremy

    2001-01-01

    Describes a way to incorporate practical content into the construction engineering and management curricula: the Internet-based Interactive Construction Management Learning System, which uses interactive and adaptive learning environments to train students in the areas of construction methods, equipment and processes using multimedia, databases,…

  16. HAPO Plant and capital equipment budget for FY 1966 and revision of budget for FY 1965 equipment not related to construction projects

    Energy Technology Data Exchange (ETDEWEB)

    McDonald, J.E.

    1964-05-12

    This document is divided into: byproduct horizontal control rod system (5 reactors); high-speed scanning-effluent temperature monitoring system (KE reactor); improved reactor gas system (100-KE & KW); safety circuit system modifications (5 reactors); alternate process hot die sizing, 313 Building 300 Area; button line equipment (234-5 Building); in-tank waste solidification (3rd unit); and misc. minor equipment projects.

  17. Composition and fundamental requirements of nuclear emergency response monitoring equipment

    International Nuclear Information System (INIS)

    Lai Yongfang; Huang Weiqi; Wang Yonghong

    2009-01-01

    Nuclear emergency monitoring equipment is concrete foundation for accomplishing radiation monitoring in nuclear or radiation accidents. Based on technical report: Generic procedures for monitoring in a nuclear or radiological emergency published by IAEA in 1999, this paper presents the main task and composition of nuclear emergency monitoring briefly, and then the basic equipment and trends of nuclear emergency monitoring equipment is put forward in detail, which is useful to construction and reinforcement of our nuclear emergency monitoring. (authors)

  18. PIK reactor construction status

    International Nuclear Information System (INIS)

    Konoplev, K.A.; Smolsky, S.L.

    2001-01-01

    The 100MW reactor PIK for fundamental researches has a thermal neutron flux of more than 10 15 n/cm 2 sec. This presentation outlines the construction state as of 2001, its prospects and completion tactics in the conditions of unstable finance. Construction of the reactor started in 1976. In 1986 construction of the building was completed and significant part of the installation work fulfilled. Construction of cooling systems was finished, the control panel assembled, and adjustment of the pump and gate valve control circuits started. After Chernobyl catastrophe, the USSR nuclear reactor safety requirements were revised. The PIK design did not meet these requirements and underwent considerable revision. The reconstruction design resulted in double the initial cost. Creation of the containment was the bulkiest part of the reconstruction. It brought about the need to disassemble the roofing of the building, dismantle all the equipment of the two upper floors, and lay up the equipment of the lower floors. As of 2001, construction in accordance with the revised design is at the stage of assemblage of the most important units, i.e. reactor itself, cooling system, heavy water system, and a number of auxiliary systems, such as depleted fuel storage, emergency cooling system etc. (orig.)

  19. DEVELOPMENT FEATURES OF LEASING RELATIONS IN CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Patimat A. Abdulkhalikova

    2017-01-01

    Full Text Available Abstract. Objectives Leasing, which is an alternative to traditional forms of investment for Russia, is currently among the most effective methods of financing construction organisations. Under conditions of shortage of available financial resources, leasing allows the modernisation of production to be carried out, modern equipment to be used or new production facilities to be opened in the shortest possible time. The purpose of the study is to comprehensively substantiate the specifics of leasing operations in construction and demonstrate its advantages as a tool for financing construction organisations. Methods The theoretical basis of the study was the fundamental provisions of economic, financial and management theory. During the process of research, logical, statistical and comparative analysis methods were used alongside expert evaluation and factor analysis approaches. Results For a leasing company whose purpose is to identify potential risk areas associated with the possibility of exceeding planned costs, it is recommended that a feasibility analysis be carried out prior to forming a loan portfolio. It is established that the transactions of a leasing company with a construction organisation can be presented as a separate investment project with a complex financial structure and a combination of interrelated long-term contracts. It is shown that the standardisation of principles of corporate governance and risk management is capable not only of reducing the susceptibility of a construction organisation to risk, but also of increasing the degree of trust on the part of customers and counterparties. Conclusion The expediency of using leasing in construction is due to the insufficient volume of private funds for the acquisition of equipment, which becomes particularly relevant against the background of rapidly aging facilities of construction organisations. Under conditions of largescale technical re-equipment, in which advanced

  20. The process control and management on equipment qualification of nuclear power plant

    International Nuclear Information System (INIS)

    Liu Dong; Wang Hongyin; Zhang Yong

    2013-01-01

    The equipment qualification (EQ) to the safety class equipment is an important safety measure for the nuclear power plants (NPP), and also reflects the nuclear safety culture. Along with the continuous constructions of NPP in China, it has become an important issue for NPP engineering company and equipment suppliers how to effectively establish standard EQ process control and management, and provide sufficient technical arrangements to maintain this EQ management system. This paper summarizes three process of EQ including Design Input, EQ Establishment and EQ Maintenance, proposes the measures and key points for EQ process control and management in phase of NPP construction, and introduces the documents management during the whole process of EQ. (authors)

  1. Construction safety program for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-06-26

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF.

  2. Construction safety program for the National Ignition Facility

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF

  3. Implementation of GPS controlled highway construction equipment, phase III.

    Science.gov (United States)

    2009-02-01

    Beginning in 2006, WisDOT and the Construction Material and Support Center (CMSC) at UW-Madison worked : together to develop the specifications and the QA/QC procedures for GPS machine guidance on highway grading : projects. These specifications and ...

  4. Manual on Safety Aspects of the Design and Equipment of Hot Laboratories

    International Nuclear Information System (INIS)

    1969-01-01

    With the development of atomic energy application and research, hot laboratories are now being constructed in a number of countries. The present publication describes and discusses experience in several countries in designing equipment for these laboratories. The safe handling of highly radioactive substances is the main purpose of hot laboratory design and equipment. The manual aims at helping those persons, particularly in the developing countries, who plan to design and construct a new hot laboratory or modify an existing one. It does not deal in great detail with the engineering design of protective and handling equipment; these matters can be found in the comprehensive list of references. The manual itself covers only basic ideas and different approaches in the design of laboratory building, hot cells, shielded and glove boxes, fume cupboards, and handling and viewing equipment. Systems for transferring materials and main services are also discussed.

  5. Construction and operation of an universal stopping equipment for the fragment separator of the GSI Darmstadt

    International Nuclear Information System (INIS)

    Weckenmann, J.; Hanelt, E.; Schmidt, K.H.

    1990-07-01

    The fragment separator is a magnetic spectrometer, in which an especially-shaped layer of matter is applied as ion-optical element. The energy loss occurring there is accompanied by a series of unwanted effects like nuclear reaction, elecromagnetic dissociation, energy and angle straggling. These effects reduce on the one hand the total resolution of the separator and on the other hand the number of the fragments, which reach the exit of the separator. In the present study it was stated that the influence of these effects exhibits in most of the cases only a weak dependence on the material of the stopper. The ideal stopper material has a mass number, which corresponds nearly to the mass number of the selected fragment. If only one single stopper material will be applied, a material with low mass number seems to be the best compromise. Therefore for the universal stopper equipment of the fragment separator aluminium was selected. A further object of this study was the profile of the stopper. In a symmetrically constructed magnet spectrometer as the fragment separator the highest resolution is then reached, when the required particles are stopped in the whole width of their momentum distribution by a constant factor. This requirement leads to a curved profile of the stopper. It was stated that the profile can be approached by a linear wedge shape without a disadvantageous change of the resolution of the separator. The technical realization of the universal stopping equipment for the fragment separator consists mainly of very accurately manufactured, shiftable, and rotatable wedge-shaped layers. By means of a step-motor guiding the profiles required for the isotope separation can thus be obtained in a wide range. (orig.) [de

  6. Visualization environment for reviewing and experimenting with compaction equipment trajectories in context

    NARCIS (Netherlands)

    Vasenev, Alexandr; Hartmann, Timo; Miller, Seirgei Rosario; Doree, Andries G.

    Visualization Environments (VEs) can assist construction professionals in studying intricate interrelations between construction equipment trajectories and their context. Such VEs typically support them in either reviewing earlier conducted work or experimenting with possible alternatives. In the

  7. New constructions of wire ropes for the industry

    Directory of Open Access Journals (Sweden)

    ŠŠaderová Jana

    1996-03-01

    Full Text Available The wire ropes are used in different industrial fields. Their construction depends on the type of equipment and its purpose. Most frequently we meet with ropes at different transport and hoisting equipments and very freqently in the civil industry. For users characteristics are important which must meet requirements of the individual regulations and standards of the selection of wire ropes for the concrete equipment. The most important is the factor of safety being safeguarded by the corresponding bearing capacity of the rope. The service life of rope is interesting for the user, too, because of having an influence on the economy of the equipment on which the rope is working. These problems are solved by the grant project at our department . We are aimed at questions of the optimization of construction of wire rope with regard to their geometric construction and service life. Respectively on the basis of elaborated computer software eightstrand ropes of parallel construction were disigned and produced at the Drôtov ň a Hlohovec. The results of the fatigue tests confirmed their better qualitative properties, longer service life and economy advantages for users, too. Their using is possible and suitable on the new hoisting eguipment on the surface, in the undeground and in the hole drilling industry. By the application of the computer technique is also possible to improve the parametres of six-strands` construction of rope, the classic and parallel constructions, especially their bearing capacity. This fact follows from the knowledge that for the production of rope we use calculated diameters of wires, which secure better utilization of the metal cross-section of the wire ropes.

  8. Perspectives for utilization of the experience from the electrical equipment modernization of Kozloduy NPP units 5 and 6 in case of construction of new NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2005-01-01

    In 2005 a governmental decision for continue the project for construction of Belene NPP was adopted. In case of start of this significant project in short terms, a good option will be to utilize the already achieved experience by the modernization program of units 5 and 6 of Kozloduy NPP. The process of construction of new NPP is associated with significant amount of engineering, civil construction works, equipment order and delivery, installation works, testing and commissioning activities. It is vital necessity to have optimal technology, strict organization for project implementation and excellent documentation. From technical point of view the experience from the modernization of units 5 and 6 of Kozloduy NPP will be very important in case of utilization of similar types of WWER 1000 units. According to the 'Feasibility study for construction of Belene NPP', the most favorable option is to accomplish the already partially constructed Unit 1 on the basis of upgraded WWER B-320 design - WWER 1000 B-392, in order to fulfill IEC 331-3A, IEC 332-3A, and of US NRC Regulatory Guide 1.70 and to construct the second unit on the basis of ASE WWER/1000 B-466. However, for any type of unit selected, the achieved experience will be an important basis. This article is focused mostly on the modernization aspects of some electrical systems of Kozloduy NPP

  9. Homemade Equipment for the Teaching of Electrochemistry at Advanced Level. Part II.

    Science.gov (United States)

    Chan, K. M.

    1985-01-01

    Provides a detailed description for the construction of equipment needed to investigate acid/base equilibria through the measurement of pH and potentiometric titrations. Suggested experiments and calibration techniques are explained. This information helps to solve the problems of inadequate, expensive equipment required for A-level chemistry…

  10. Development of Advanced Concept for Shortening Construction Period of ABWR Plant

    International Nuclear Information System (INIS)

    Hiroshi Ijichi; Toshio Yamashita; Masahiro Tsutagawa; Hiroya Mori; Nobuaki Ooshima; Jun Miura; Minoru Kanechika; Nobuaki Miura

    2002-01-01

    Construction of a nuclear power plant (NPP) requires a very long period because of large amount of construction materials and many issues for negotiation among multiple sections. Shortening the construction period advances the date of return on an investment, and can also result in reduced construction cost. Therefore, the study of this subject has a very high priority for utilities. We achieved a construction period of 37 months from the first concrete work to fuel loading (F/L) (51.5 months from the inspection of the foundation (I/F) to the start of commercial operation (C/O)) at the Kashiwazaki-Kariwa NPPs No. 6 and 7 (KK-6/7), which are the first ABWR plants in the world. At TEPCO's next plant, we think that a construction period of less than 36 months (45 months from I/F to C/O) can be realized based on conventional methods such as early start of equipment installation and blocking of equipment to be brought in advance. Furthermore, we are studying the feasibility of a 21.5-month construction period (30 months from I/F to C/O) with advanced ideas and methods. The important concepts for a 21.5-month construction period are adoption of a new building structure that is the steel plate reinforced concrete (SC) structure and promotion of extensive modularization of equipment and building structure. With introducing these new concepts, we are planning the master schedule (M/S) and finding solutions to conflicts in the schedule of area release from building construction work to equipment installation work (schedule-conflicts.) In this report, we present the shortest construction period and an effective method to put it into practice for the conventional general arrangement (GA) of ABWR. In the future, we will continue the study on the improvement of building configuration and arrangements, and make clear of the concept for large composite modules of building structures and equipment. (authors)

  11. Comparison between two models of elbow rehabilitation equipment

    Directory of Open Access Journals (Sweden)

    Vetrice Georgiana

    2017-01-01

    Full Text Available International studies have revealed that using continuous passive motion (CPM equipment as part of a rehabilitation program improves the recovery period and also diminishes the rehabilitation costs by about 50%. This explains the need for conceiving elbow joint rehabilitation equipment to help persons suffering from posttraumatic disabilities. In order to create the best model to meet the patients’ requirements this paper presents two constructive solutions of such equipment and a comparison between their designs. Both achieve the desired movements of the elbow joint: flexion-extension and pronation-supination and are actuated by pneumatic muscles, due to the multiple advantages of pneumatic actuation: low cost, compliance and favorable response to commands.

  12. 21 CFR 1250.33 - Utensils and equipment.

    Science.gov (United States)

    2010-04-01

    ... Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... SANITATION Food Service Sanitation on Land and Air Conveyances, and Vessels § 1250.33 Utensils and equipment... of food or beverages, and the cleaning of food utensils, shall be so constructed as to be easily...

  13. 3D design terrain models for construction plans and GPS control of highway construction equipment.

    Science.gov (United States)

    2010-03-01

    Research was conducted with the objectives of 1) identifying and characterizing benefits and technological, institutional, cultural, and : legal impediments associated with adoption of 3D design and construction technologies, identifying strategies t...

  14. Evaluation of artillery equipment maintenance support capability based on grey clustering

    Science.gov (United States)

    Zhai, Mei-jie; Gao, Peng

    2017-12-01

    This paper, the theory and method of evaluating the capability of equipment maintenance support in China and abroad are studied, from the point of view of the combat task of artillery troops and the strategic attachment in the future military struggle. This paper establishes the framework of the evaluation Index system of the equipment maintenance support capability of the artillery units, and applies the grey clustering method to the evaluation of the equipment maintenance support capability of the artillery units, and finally evaluates the equipment maintenance and support capability of the artillery brigade as an example, and analyzes the evaluation results. This paper finds out the outstanding problems existing in the maintenance and support of military equipment, and puts forward some constructive suggestions, in order to improve the status of military equipment maintenance and support and improve the level of future equipment maintenance.

  15. SUBSTANTIATION OF EFFICIENCY OF THE MULTI-PURPOSE CONSTRUCTION MACHINERY IN EARTHWORKS

    Directory of Open Access Journals (Sweden)

    SOKOLOV I. A.

    2015-11-01

    Full Text Available Formulation of the problem. Construction of buildings and structures is a complex process, one of the components of which are the processing of digging. The cost structure constructed earthworks, depending on the types of buildings and structures, ranging from three to sixty percent. Currently, excavation work on 98% mechanized. Machines for the production of excavation, are one of the main vehicles by which the comprehensive mechanization of construction. Equipment construction vehicle with high, fast replacement of obsolete equipment with new, highly productive - one of the main ways of increasing the efficiency of excavation in construction. Intensification excavation mainly ensured by improving the organizational and technological measures to ensure efficient use of earthmoving equipment fleet. The current structure of the fleet, each of which can perform only one operation of the production cycle, resulting in the fact that for the implementation of the entire set of works on creation of earthworks necessary to form a set of machines capable to realize them. An alternative is to use a set of machines earth-moving equipment, multi-purpose equipped with 5-10 kinds of changeable working equipment with 20-40 working bodies, which provides all kinds of earthworks single machine. The purpose of the article. Develop a mechanism for technical and economic assessment of the effectiveness of the set of specialized earth-moving machines as compared to earth-moving machines, multi-purpose allows, under specified production parameters, to establish the limits of their effective application. To determine the efficiency of each unit of the considered earth-moving equipment, and further, to form a rational set of machines that can run on time given the amount of work at minimum cost. Conclusions. Systematic approach to the design of complete production process of digging it possible to establish the relationship between technology and feasibility indexes

  16. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  17. MANUAL FOOD AND BEVERAGE DISPENSING EQUIPMENT. NATIONAL SANITATION FOUNDATION STANDARD NO. 18.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI.

    THIS STANDARD COVERS THE SANITATION REQUIREMENTS FOR EQUIPMENT AND DEVICES WHICH DISPENSE FOOD OR BEVERAGE EITHER IN BULK OR PORTIONS. VENDING MACHINES OR BULK MILK DISPENSING EQUIPMENT ARE NOT COVERED IN THIS STANDARD. ITEMS COVERED INCLUDE THE BASIC PRINCIPLES OF DESIGN AND CONSTRUCTION, FOOD PROTECTION AND FREEDOM FROM HARBORAGES. MINIMUM…

  18. Seismic effects on technological equipment and systems of nuclear power plants

    International Nuclear Information System (INIS)

    Masopust, R.; Pecinka, L.; Podrouzek, J.

    1983-01-01

    A survey is given of problems related to the construction of nuclear power plants with regard to seismic resistance. Sei--smic resistance of technological equipment is evaluated by experimental trials, calculation or the combination of both. Existing and future standards are given for the given field. The Czechoslovak situation is discussed as related to the construction of the Mochovce nuclear power plant. Procedures for testing seismic resistance, types of tests and methods of simulating seismic excitation are described. Antiseismic measures together with structural elements for limiting the seismic effects on technological equipment and nuclear power plant systems are summed up on the basis of foreign experience. (E.F.)

  19. Construction of anhydrite dams

    Energy Technology Data Exchange (ETDEWEB)

    Bortoluzzi, L; Francois, G

    1977-05-01

    To construct a ventilation dam, the road is closed with a fibreglass sheet onto which 3 or 4 cm of anhydrite paste is sprayed. The equipment necessary is described, and the cost is compared with that of an aggregate dam.

  20. Experimental Equipment for Physics Studies in the Aagesta Reactor

    Energy Technology Data Exchange (ETDEWEB)

    Bernander, G; Blomberg, P E; Dubois, P O

    1967-03-15

    Comprehensive physics measurements were carried out in connection with the start up of the Agesta reactor. For this purpose special experimental equipment was constructed and installed in the reactor. Parts of this were indispensable and/or time-saving for the reactivity control during the core build-up period and during the first criticality studies. This report gives mainly a detailed description of the experimental equipment used, but also the relevant physics background and the experience gained during the performance.

  1. Fluorolon coatings of cold drying for radiation-protective equipment

    International Nuclear Information System (INIS)

    Shigorina, I.I.; Egorov, B.N.; Timofeeva, L.P.

    1977-01-01

    A composition of the volatile fraction (butyl acetate:acetone = 3:1) is proposed for fluorolon 32L base varnishes possessing high viability. Formulations for the fluorolon air-drying enamels of various colous are presented. Fluorolon coatings based on these enamels are detailed, providing satisfactory adhesion properties. A fairly high chemical stability of these coatings is shown making it possible to employ them for anti-corrosion protection of outer surfaces, equipment and building constructions for chemical equipment

  2. Elbow joint rehabilitation equipment actuated by pneumatic muscles

    Directory of Open Access Journals (Sweden)

    Vetrice Georgiana

    2017-01-01

    Full Text Available The mobility of the limbs is an essential prerequisite for the individual’s physical autonomy. For persons suffering from post-traumatic affections of the elbow joint such limited mobility results in barriers in fulfilling personal or professional tasks. Passive motion has certain specific advantages and beneficial effects, thus being highly recommended for the recovery of injured joints. The paper presents a model of rehabilitation equipment that induces continuous passive motion of the elbow, as part of a recovery programme. The equipment is actuated by pneumatic muscles, using compressed air as the source of energy that generates force and motion. The main benefits of the pneumatic actuation system compared to other driving systems are its low cost, simple and robust construction and swift response to commands. Its constructive simplicity and reduced cost adds to the system’s eligibility for deployment in medical units.

  3. Application and Mechanics Analysis of Multi-Function Construction Platforms in Prefabricated-Concrete Construction

    Science.gov (United States)

    Wang, Meihua; Li, Rongshuai; Zhang, Wenze

    2017-11-01

    Multi-function construction platforms (MCPs) as an “old construction technology, new application” of the building facade construction equipment, its efforts to reduce labour intensity, improve labour productivity, ensure construction safety, shorten the duration of construction and other aspects of the effect are significant. In this study, the functional analysis of the multi-function construction platforms is carried out in the construction of the assembly building. Based on the general finite element software ANSYS, the static calculation and dynamic characteristics analysis of the MCPs structure are analysed, the simplified finite element model is constructed, and the selection of the unit, the processing and solution of boundary are under discussion and research. The maximum deformation value, the maximum stress value and the structural dynamic characteristic model are obtained. The dangerous parts of the platform structure are analysed, too. Multiple types of MCPs under engineering construction conditions are calculated, so as to put forward the rationalization suggestions for engineering application of the MCPs.

  4. 46 CFR 160.053-3 - Materials, construction and workmanship.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, construction and workmanship. 160.053-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Work Vests, Unicellular Plastic Foam § 160.053-3 Materials, construction and workmanship. (a) General. Except as otherwise specifically...

  5. 46 CFR 160.038-3 - Materials, workmanship, and construction.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, and construction. 160.038-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL LIFESAVING EQUIPMENT Magazine Chests, Portable, for Merchant Vessels § 160.038-3 Materials, workmanship, and construction. (a) Portable magazine chests shall...

  6. Advances in impact resistance testing for explosion-proof electrical equipment

    Directory of Open Access Journals (Sweden)

    Pasculescu Vlad Mihai

    2017-01-01

    Full Text Available The design, construction and exploitation of electrical equipment intended to be used in potentially explosive atmospheres presents a series of difficulties. Therefore, the approach of these phases requires special attention concerning technical, financial and occupational health and safety aspects. In order for them not to generate an ignition source for the explosive atmosphere, such equipment have to be subjected to a series of type tests aiming to decrease the explosion risk in technological installations which operate in potentially explosive atmospheres. Explosion protection being a concern of researchers and authorities worldwide, testing and certification of explosion-proof electrical equipment, required for their conformity assessment, are extremely important, taking into account the unexpected explosion hazard due to potentially explosive atmospheres, risk which has to be minimized in order to ensure the occupational health and safety of workers, for preventing material losses and for decreasing the environmental pollution. Besides others, one of the type tests, which shall be applied, for explosion-proof electrical equipment is the impact resistance test, described in detail in EN 60079 which specifies the general requirements for construction, testing and marking of electrical equipment and Ex components intended for use in explosive atmospheres. This paper presents an analysis on the requirements of the impact resistance test for explosion-proof electrical equipment and on the possibilities to improve this type of test, by making use of modern computer simulation tools based on finite element analysis, techniques which are widely used nowadays in the industry and for research purposes.

  7. On-site equipment and materials against CBRNE terrorism

    International Nuclear Information System (INIS)

    Yamamoto, Soichiro; Tokita, Kenichi

    2016-01-01

    There is no almighty field service equipment that can handle by itself all CBRNE (Chemical, Biological, Radiological, Nuclear, Explosive) terrorism. Since there is merit and demerit for each of equipment, operation methods and linkage of material/equipment based on detection principle are indispensable. This paper explained the principle and operation method of detection equipment, operation using multiple material/equipment, and system construction to facilitate cooperation with related ministries and agencies. There are six examples as typical material/equipment and detection principle for handling CBRNE as shown below: (1) ion mobility spectrometer, (2) infrared spectroscopy, (3) Raman scattering spectroscopy, (4) gas chromatographic mass spectrometry, (5) fluorescent reactive dye classification method, and (6) antigen antibody reaction method. This paper shows a flowchart that can measure within the duration of a respirator while wearing Level A protective clothing (about 15 to 20 min) by the combination of detector/analyzer based on these methods. The authors developed an information system that allows prompt information exchange between the on-site administrative agencies, research institutes, and other related organizations via network, in the case when substances etc. could not be specified in the above flowchart. (A.O.)

  8. Application of owner technical management in hydraulic machinery and electrical equipment investment target control

    International Nuclear Information System (INIS)

    Luo, H

    2012-01-01

    Using technical means in investment target control is an effective method to improve investment benefit of a construction project. Take the practice of construction and management in hydropower station as an example, the investment and management need of the owner is put forward through the investment target decision-making process of electromechanical equipment. Owner technical management in the specific application measures and effects of investment target control was discussed in the paper, and the revelation in investment target control application of owner technical management was also summarized. The paper is aimed to provide a useful reference for the investment target control work in the construction of electromechanical equipment.

  9. Modern optimization in earthwork construction

    OpenAIRE

    Parente, Manuel; Correia, A. Gomes; Cortez, Paulo

    2015-01-01

    Earthworks tasks are often regarded in transportation projects as some of the most demanding processes. In fact, sequential tasks such as excavation, transportation, spreading and compaction are strongly based on heavy mechanical equipment and repetitive processes, thus becoming as economically demanding as they are time-consuming. Moreover, actual construction requirements originate higher demands for productivity and safety in earthwork constructions. Given the percentual weight of costs an...

  10. 46 CFR 162.017-3 - Materials, construction, and workmanship.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, construction, and workmanship. 162.017-3..., CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL ENGINEERING EQUIPMENT Valves, Pressure-Vacuum Relief, for Tank Vessels § 162.017-3 Materials, construction, and workmanship. (a) The valves shall be of...

  11. ERGONOMIC AND ECOLOGICALSAFETY - FACTORSNESSARY TO IMPROVETHE COMPETITIVENESS OF THE DOMESTIC CONSTRUCTION MACHINERY

    Directory of Open Access Journals (Sweden)

    Volkov Andrey Anatol’evich

    2017-03-01

    Full Text Available The analysis of output and domestic used construction machinery showed that the most vulnerable link remains a problem of underreporting of ergonomics and environmental safety requirements. Compliance with ergonomic requirements enhances the performance of mechanized operations, leading to a decrease in construction costs. Increased environmental requirements reduce the negative impact on air basin. These results suggest the need to improve the structures of building machines. Made recommendations for a comprehensive solution to the problem. The measures to improve environmental safety, ergonomic design requirements of construction machinery, mechanisms of the optimal development of the domestic construction machinery, through the development and implementation of appropriate measures. Keywords: ergonomics of construction equipment, environmental safety of construction equipment

  12. New Technical Solution for Vertical Shaft Equipping Using Steel Headframe of Multifunction Purpose

    Science.gov (United States)

    Kassikhina, Elena; Pershin, Vladimir; Glazkov, Yurij

    2017-11-01

    The article reviews a novel approach to the design of steel angle headframe for vertical shafts of coal and ore mines on the basis of rational design solutions. Practice of construction of coal and ore mines provides application of various designs for steel angle headframes which are divided into separate large assembly blocks and constructive elements during assembling operations. Design of these blocks and elements, their weight and dimensions effect the chose of the method of assembling on which economic and technological indicators, as well as duration of down-time, depend on during performance of construction operations in shaft. The technical solution on equipment provision for mine vertical shaft using headframe of multifunctional purpose will allow changing the management construction of vertical shaft. The constructive design of the headgear allows application of the effective method of assembly and thus to provide improvement of the technical and economic indexes, and high calendar time rate of the shaft construction due to reduction of duration of works on equipment provision for the shaft and to refurbishment of the shaft in order to carry out horizontal mining.

  13. Equipment to weld fuel rods of mixed oxides

    International Nuclear Information System (INIS)

    Aparicio, G.; Orlando, O.S.; Olano, V.R.; Toubes, B.; Munoz, C.A.

    1987-01-01

    Two welding outfits system T1G were designed and constructed to weld fuel rods with mixed oxides pellets (uranium and plutonium). One of them is connected to a glove box where the loading of sheaths takes place. The sheaths are driven to the welder through a removable plug pusher in the welding chamber. This equipment was designed to perform welding tests changing the parameters (gas composition and pressure, welding current, electrode position, etc.). The components of the welder, such as plug holder, chamber closure and peripheral accessories, were designed and constructed taking into account the working pressures in the machine, which is placed in a controlled area and connected to a glove box, where special safety conditions are necessary. The equipment to weld fuel bars is complemented by another machine, located in cold area, of the type presently used in the fuel elements factory. This equipment has been designed to perform some welding operations in sheaths and mixed oxide rods of the type Atucha I and II. Both machines have a programmed power supply of wide range and a vacuum, and pressurizing system that allows the change of parameters. Both systems have special features of handling and operation. (Author)

  14. 46 CFR 27.305 - What are the requirements for fire-extinguishing equipment on towing vessels in ocean or coastal...

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false What are the requirements for fire-extinguishing equipment on towing vessels in ocean or coastal service whose construction was contracted for on or after... for fire-extinguishing equipment on towing vessels in ocean or coastal service whose construction was...

  15. Shortening of construction period of nuclear power plant. Activities of construction industry on construction period shortening

    International Nuclear Information System (INIS)

    Kamata, Hirofumi

    2011-01-01

    Total construction period could be shorten by prefabricating structures efficiently in another yard and reducing working hours on site, which would reduce work at height or congestion work and also upgrade safety at work. Construction period shortening would surely reduce expenses during work and advance operation start of electric utilities. Construction of reactor building, turbine building, water intake and drainage canal was performed on a relatively large scale and a big share of whole schedule. This article summarized basic technologies to shorten construction period for reactor building/turbine building and water intake and drainage canal. Advanced methods of reactor building/turbine building; (1) modularization of equipment and skeleton, (2) utilization of concrete mold, reinforcing bar and steel frame, (3) precedent steel frame method and (4) steel plate reinforced concrete (SC) method, were outlined and their application examples were shown to reduce work on site and improve work efficiency. As for water intake and drainage canal construction, (1) precast concrete method, (2) SC method and (3) steel plate shell method were described with application examples. Construction procedures and problems using mega block method for water intake and drainage canal were also introduced. (T. Tanaka)

  16. Cryogenic equipment

    International Nuclear Information System (INIS)

    Leger, L.; Javellaud, J.; Caro, C.; Gilguy, R.; Testard, O.

    1966-06-01

    The cryostats presented here were built from standard parts; this makes it possible to construct a great variety of apparatus at minimum cost. The liquid nitrogen and helium reservoirs were designed so as to reduce losses to a minimum, and so as to make the cryostats as autonomous as possible. The experimental enclosure which is generally placed in the lower part of the apparatus requires a separate study in every case. Furthermore, complete assemblies such as transfer rods, isolated traps and high vacuum valves, were designed with a similar regard for the economic aspects and for the need for standardization. This equipment thus satisfies a great variety of experimental needs; it is readily adaptable and the consumptions of helium and liquid nitrogen are very low. (authors) [fr

  17. 30 CFR 75.1710 - Canopies or cabs; diesel-powered and electric face equipment.

    Science.gov (United States)

    2010-07-01

    ...-powered and electric face equipment, including shuttle cars, be provided with substantially constructed... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Canopies or cabs; diesel-powered and electric... Miscellaneous § 75.1710 Canopies or cabs; diesel-powered and electric face equipment. In any coal mine where the...

  18. Policy analysis of the budget used in training program for reducing lower back pain among heavy equipment operators in the construction industry: System dynamics approach

    Science.gov (United States)

    Vitharana, V. H. P.; Chinda, T.

    2018-04-01

    Lower back pain (LBP), prevalence is high among the heavy equipment operators leading to high compensation cost in the construction industry. It is found that proper training program assists in reducing chances of having LBP. This study, therefore aims to examine different safety related budget available to support LBP related training program for different age group workers, utilizing system dynamics modeling approach. The simulation results show that at least 2.5% of the total budget must be allocated in the safety and health budget to reduce the chances of having LBP cases.

  19. Construction and fitting of NUCEF

    International Nuclear Information System (INIS)

    Takeshita, Isao; Itahashi, Takayuki; Izawa, Naoki; Okazaki, Shuji

    1994-01-01

    NUCEF consists of two criticality experiment devices, three alpha-gamma cells, the experimental equipments contained in about 90 glove boxes and many others. The background and the course of the construction and fitting of NUCEF are described on the selection of important research, the rationalization of facilities, the integration of the criticality safety experiments facility(CSEF) and the TRU safety test facility(TRUST), the safety examination, and the construction and fitting. The whole NUCEF, the static criticality facility(STACY), the transient criticality facility(TRACY), the mock-up test of the machinery and equipment for both criticality facilities, the solution fuel preparation facility, cells and glove boxes and the equipment contained in them, the analysis facility consists of four analysis rooms, and the radioactive waste facility for gas, liquid and solid wastes are described. The classification of these facilities based on the relevant laws is shown. The way of thinking in the basic design and the detailed design is explained. The permission of nuclear reactor installation and the use of nuclear fuel substances was obtained. The design and the method of works were approved. The inspection is reported. The measures for the security are explained. (K.I.)

  20. Yemen watched from cement plant construction work. Cement plant koji wo toshite mita Yemen

    Energy Technology Data Exchange (ETDEWEB)

    Furuta, M [Kajima Corp., Tokyo (Japan)

    1993-06-25

    Construction of a cement plant was planned at southern part of Yemen. This is a cement plant with annual production 500,000 tons. The term of work was from January, 1990 to February, 1993. The present paper describes an outline the construction of this Cement Plant, the nationality and living environment in Yemen, and construction equipment which was used. The construction work consisted of 113,000m[sup 3] of digging, 82,000m[sup 3] of backfilling, 66,100m[sup 3] of concreting, and 29,285m[sup 3] of asphalt pavement. Reinforcing steel weighing 6,400 tons and steel frame weighing 3,600 tons were totally used. Equipment weighing 7,912 tons and electric devices weighing 1,299 tons were totally installed. For this construction work, two crawler cranes, six hydraulic cranes, aggregate plant, concrete mixers, and construction equipment, such as bulldozers, shovels, and dumpers, were brought from Japan. 5 figs.

  1. Development of ion/proton beam equipment for industrial uses

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Byung Ho; Lee, J. H.; Cho, Y. S.; Joo, P. K.; Kang, S. S.; Song, W. S.; Kim, H. J.; Chang, G. H.; Bang, S. W

    1999-12-01

    KAERI has possessed design and fabrication technologies of various ion sources including Duoplasmatron and DuoPiGatron developed by R and D projects of the long-term nuclear technology development program. In order to industrialize ion beam equipments utilizing these ion sources, a technology transfer project for a technology transfer project for a domestic firm has been performed. Under this project, engineers of the firm have been trained through classroom lectures of ion beam principles and OJT, an ion/proton beam equipment (DEMO equipment) has been designed, assembled and commissioned jointly with the engineers. Quality of the ion sources has been quantified, and technologies for ion beam equipment construction, functional test and application research have been developed. The DEMO equipment, which consists of an ion source, power supplies, vacuum, cooling and target systems, has been fabricated and tested to secure stability and reliability for industrial uses. Various characteristic tests including high voltage insulation, beam extraction, beam current measuring, etc. have been performed. This DEMO can be utilized for ion sources development as well as ion beam process development for various industrial products. Engineers of the firm have been trained for the industrialization of ion beam equipment and joined in beam application technology development to create industrial needs of beam equipment. (author)

  2. Construction of solid waste form test facility

    International Nuclear Information System (INIS)

    Park, Hyun Whee; Lee, Kang Moo; Koo, Jun Mo; Jung, In Ha; Lee, Jong Ryeul; Kim, Sung Whan; Bae, Sang Min; Cho, Kang Whon; Sung, Suk Jong

    1989-02-01

    The Solid Waste Form Test Facility (SWFTF) is now construction at DAEDUCK in Korea. In SWFTF, the characteristics of solidified waste products as radiological homogeneity, mechanical and thermal property, water resistance and lechability will be tested and evaluated to meet conditions for long-term storage or final disposal of wastes. The construction of solid waste form test facility has been started with finishing its design of a building and equipments in Sep. 1984, and now building construction is completed. Radioactive gas treatment system, extinguishers, cooling and heating system for the facility, electrical equipments, Master/Slave manipulator, power manipulator, lead glass and C.C.T.V. has also been installed. SWFTF will be established in the beginning of 1990's. At this report, radiation shielding door, nondestructive test of the wall, instrumentation system for the utility supply system and cell lighting system are described. (Author)

  3. Advisibility of excavating an additional central shaft to reduce duration of mine construction. [USSR

    Energy Technology Data Exchange (ETDEWEB)

    Durov, E.M.

    1981-09-01

    This paper evaluates methods of reducing duration and cost of underground black coal mine construction. A proposed scheme of coal deposit opening by a system of three mine shafts is critically analyzed. In comparison to the conventional scheme, the proposed one has one additional mine shaft in the central mine zone. The shaft, equipped with a cage hoisting system, permits the rate of mine drivage in the center of the mine to be increased. The cage hoisting system in the additional shaft is activated before the main skip shaft has been equipped and is in operation. Duration of mine construction is reduced by 6 to 10 months. Exacavation of the additional shaft costs from 2.5 to 3.5 million rubles. A further system of mine construction is also analyzed. The main shaft in the mine center is temporarily equipped with a cage hoisting system. The cage system is used for hoisting rocks removed from mine headings and main workings constructed at the bottom of the main shaft. The main shaft is equipped with skips and hoisting tower at a later stage when construction of main roadways and structures at its bottom has been completed. The proposed system permits mine construction to be reduced by 4 to 5 months without a major increase in investment.

  4. Universal machine ''Shtrek'' and the tractor-lifter with pneumatic-equipment control. [Auxiliary multipurpose materials handling equipment

    Energy Technology Data Exchange (ETDEWEB)

    Bal' bert, B M; Borumenskiy, V A; Lishenko, A P; Mitchenko, G A

    1982-01-01

    The machine ''Shtrek'' is described. It makes it possible to mechanize over 20 auxiliary operations: loading-unloading operations: extraction of old and deformed timbering; dissmantling of obstructions; erection of different types of timbering; making and restoring of drainage channels; laying and straightening of a drift and its leveling; assembly and disassembly of pipelines and mine equipment, etc. Depending on the type of operation, the machine has the corresponding suspended equipment. The elementary variant has a limited area of application at mines of the central region of the Dunbass. Currently a pneumatic variant of the machine ''Shtrek'' has been developed. The electric motor and the starter of the pumping equipment of the machine have been replaced by a pneumatic motor and pneumatically controlled valve KTM-50. In this case there was significant reduction in the weight of the pumping equipment and in its overall dimensions; the electric drive of the hydraulic distributors for controlling the mechanisms were replaced by simpler pneumatic ones; the logical circuit of the control system was constructed on the USEPPA elements. A specialized tractor-lifter designed for moving suspended loads is described for auxiliary operations in the near-face zone of the preparatory drifts. The machine also lifts and lowers the boom, rotates the boom by 270/sup 0/ and additionally lifts and lowers the weight-lifting hook.

  5. The method innovation in nuclear equipment quality witness tracing and management

    International Nuclear Information System (INIS)

    Hao Guang

    2012-01-01

    The total construction cost of a nuclear power plant, equipment procurement cost accounts for about 47%-53%. Whether the quality of equipment can meet the technical requirements plays a significant role in the operation and maintenance of a nuclear power plant. Only if we adopt effective management can the equipment quality be ensured. As the most important method of quality control, the effective attendance and track of quality witness points has a crucial effect on contract smooth implementation as well. The essay mainly illustrates the method of quality witness point tracing and management and how to incorporate serious minded ideas and all take part in ways into quality management, hoping to offer some enlightenment on the innovation of nuclear power equipment quality management. (author)

  6. Status of the nondestructive examination equipment for the fuels and materials examination facility

    International Nuclear Information System (INIS)

    Frandsen, G.B.

    1980-01-01

    The present status of Nondestructive Examination (NDE) Equipment proposed for the Fuels and Materials Examination Facility (FMEF) now under construction at the Hanford Engineering Development Laboratory is discussed. Items discussed include the NDE cell receiving machine, the dismantling machine, the standard examination stage, profilometry, eddy current, wire wrap removal machine, surface examination, gamma scan and general NDE equipment

  7. 48 CFR 22.1003-6 - Repair distinguished from remanufacturing of equipment.

    Science.gov (United States)

    2010-10-01

    ... include the following: (1) Repair of an automobile, truck, or other vehicle, construction equipment... 22.1003-4(c)(1) and (d)(1)(iv)). (3) Repair of appliances, radios, television sets, calculators, and...

  8. Behavioural Motives of Acquisition of Solar-driven Equipment

    Directory of Open Access Journals (Sweden)

    Shkurupska Iryna O.

    2013-12-01

    Full Text Available The article identifies needs of the target group, namely structure of motives, which justify making a decision to buy, in order to create efficient marketing strategy of an enterprise, which sell solar-driven equipment in Ukraine. There are five segments in the domestic market of helio-systems: individual consumers, recreation industry, agrarian industry, construction and social spheres. The article allocates 15 motives of acquisition of the solar-driven equipment for these segments, the most important of which are price, availability of solar energy, alternative price and energy saving. Besides, the structure of such motives is determined for each segment individually. In order to choose specific marketing instruments in the policy of promotion of solar-driven equipment, the article identifies differences in the form of goals of use and motives of acquisition between the specified consumer segments. The article reveals certain barriers that interfere with acquisition of solar-driven equipment – low level of trust into helio-systems, conservatism of consumers, absence of free applications for consumers – overcoming which is only possible with the help of certain marketing actions.

  9. Brief scales to assess physical activity and sedentary equipment in the home

    Directory of Open Access Journals (Sweden)

    Durant Nefertiti

    2010-01-01

    Full Text Available Abstract Background Sedentary behaviors such as TV viewing are associated with childhood obesity, while physical activity promotes healthy weight. The role of the home environment in shaping these behaviors among youth is poorly understood. The study purpose was to examine the reliability of brief parental proxy-report and adolescent self-report measures of electronic equipment and physical activity equipment in the home and to assess the construct validity of these scales by examining their relationship to physical activity, sedentary behavior, and weight status of children and adolescents. Methods Participants were adolescents (n = 189; mean age = 14.6, parents of adolescents (n = 171; mean age = 45.0, and parents of younger children (n = 116; parents mean age = 39.6; children's mean age = 8.3 who completed two surveys approximately one month apart. Measures included a 21-item electronic equipment scale (to assess sedentary behavior facilitators in the home, in the child or adolescent's bedroom, and portable electronics and a 14-item home physical activity equipment scale. Home environment factors were examined as correlates of children's and adolescents' physical activity, sedentary behavior, and weight status after adjusting for child age, sex, race/ethnicity, household income, and number of children in the home. Results Most scales had acceptable test-retest reliability (intraclass correlations were .54 - .92. Parent and adolescent reports were correlated. Electronic equipment in adolescents' bedrooms was positively related to sedentary behavior. Activity equipment in the home was inversely associated with television time in adolescents and children, and positively correlated with adolescents' physical activity. Children's BMI z-score was positively associated with having a television in their bedroom. Conclusions The measures of home electronic equipment and activity equipment were similarly reliable when reported by parents and by

  10. Scientific Equipment Division - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2001-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: - designing of devices and equipment for experiments in physics, their mechanical construction and assembly. In particular, there are vacuum chambers and installations for HV and UHV; - maintenance and upgrading of the existing installations and equipment in our Institute; - participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and a AO plotter, what allows us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop can offer a wide range of machining and treatment methods with satisfactory tolerances and surface quality. It offers the following possibilities: - turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc-type elements of a diameter up to 600 mm and a length not exceeding 300 mm; - milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm; - grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm; - drilling - holes of a diameter up to 50 mm; - welding - electrical and gas welding, including TIG vacuum-tight welding; - soft and hard soldering; - mechanical works including precision engineering; - plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides; - painting - paint spraying with possibility of using furnace-fred drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop posses CNC milling machine which can be used for machining of work-pieces up to 500 kg

  11. International Economic Association on organization of co-operative production and development of equipment and providing technical assistance in construction of nuclear power plants - ''INTERATOMENERGO''

    International Nuclear Information System (INIS)

    Mal'tsev, N.D.

    1979-01-01

    History is stated of foundation of the International Economic Association ''Interatomenergo''. Structure is given of the Association and the list of main problems to be solved by it. Project is given of the programm of co-operation in the field of scientific and technical works as well as of design and projecting works in creation of new types of equipment for nuclear power plants, in particular, creation of serial power units with improved WWER-1000 reactor. Directions are stated of activity of the Association in the field of providing assistance in construction and exploitation of nuclear power plants as well as in training of operational personnel [ru

  12. Selection of equipment for equipment qualification

    International Nuclear Information System (INIS)

    Torr, K.G.

    1989-01-01

    This report describes the methodology applied in selecting equipment in the special safety systems for equipment qualification in the CANDU 600 MW nuclear generating stations at Gentilly 2 and Point Lepreau. Included is an explanation of the selection procedure adopted and the rationale behind the criteria used in identifying the equipment. The equipment items on the list have been grouped into three priority categories as a planning aid to AECB staff for a review of the qualification status of the special safety systems

  13. Concrete pedestals for high-performance semiconductor production equipment

    Science.gov (United States)

    Vogen, Wayne; Franklin, Craig L.; Morneault, Joseph

    1999-09-01

    Concrete pedestals have many vibration and stiffness characteristics that make them a superior choice for sensitive semiconductor production equipment including scanners, scanning electron microscopes, focused ion beam millers and optical inspection equipment. Among the advantages of concrete pedestals are high inherent damping, monolithic construction that eliminates low stiffness joints common in steep pedestals, ability to reuse and ease of installation. Steel pedestals that have plates attached to the top of the frame are easily excited by acoustic excitation, especially in the range from 50 Hertz to 400 Hertz. Concrete pedestals do not suffer from this phenomenon because of the high mass and damping of the top surface.

  14. The Architecture Design of Detection and Calibration System for High-voltage Electrical Equipment

    Science.gov (United States)

    Ma, Y.; Lin, Y.; Yang, Y.; Gu, Ch; Yang, F.; Zou, L. D.

    2018-01-01

    With the construction of Material Quality Inspection Center of Shandong electric power company, Electric Power Research Institute takes on more jobs on quality analysis and laboratory calibration for high-voltage electrical equipment, and informationization construction becomes urgent. In the paper we design a consolidated system, which implements the electronic management and online automation process for material sampling, test apparatus detection and field test. In the three jobs we use QR code scanning, online Word editing and electronic signature. These techniques simplify the complex process of warehouse management and testing report transferring, and largely reduce the manual procedure. The construction of the standardized detection information platform realizes the integrated management of high-voltage electrical equipment from their networking, running to periodic detection. According to system operation evaluation, the speed of transferring report is doubled, and querying data is also easier and faster.

  15. Activity of the Service for maintenance of the electronic equipment of the RA reactor in 1976, report - Annex IV

    International Nuclear Information System (INIS)

    Milosevic, M.

    1976-01-01

    Within the organizational structure of the RA reactor staff, the Service for instrumentation maintenance has the following tasks: maintenance of the existing electronic equipment; participating in experiments planning and preparation of electronic equipment; purchasing new equipment, spare parts and components; construction of new equipment for internal needs; implementation of new equipment. Basic instrumentation of the reactor facility includes: control and protection system, and dosimetry system [sr

  16. Methodology development for availability improvement of standby equipment

    International Nuclear Information System (INIS)

    Shin, Sung Min; Jeon, In Seop; Kang, Hyun Gook

    2014-01-01

    The core damage frequency (CDF) of operating and constructing pressurized nuclear plants are ranging on the order of 10 -5 and 10 -6 per year. The target CDF of new NPP design has been set at 10 -7 . In this context, although various systems are currently studied, availability improvement of standby equipment will be more efficient than the additional application of safety systems. It is obvious in every aspect, such as management and cost efficiency. Here, soundness can affect equipment unavailability, and the soundness degrades because of aging. However, some studies did not consider aging when calculating the unavailability. Standby equipment can age because of two important factors: standby stress which accumulates over time, and test stress which accumulates with the number of tests (or operations). Both factors should be considered together when aging is considered. However, some studies only considered standby stress or test stress. There are some previous studies which considered both factors. Besides equipment soundness related to aging effect, some process like bypass during test also can affect equipment unavailability because the original function of equipment cannot be performed immediately during this process. However, there are seldom studies dealing with above factors as a whole problem. This study investigated a general approach to calculate the unavailability of standby equipment which considers aging caused by standby and test stresses and bypass process. Based on this general approach, we propose two maintenance strategies which aim to reduce standby equipment unavailability. In section 2, the general approach is presented. As one of the strategies, the changing test interval method (CIM) is introduced in section 3, and its effectiveness is also analyzed. The online monitoring method (OMM) is investigated in section 4 as another method to reduce equipment unavailability. In section 5, a combination of these two methods is analyzed. A general

  17. Division of Scientific Equipment - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2002-01-01

    Full text: The Scientific Equipment Division consists of the Design Group and the Mechanical Workshop. The activity of the Division includes the following: * designs of devices and equipment for experiments in physics; their mechanical construction and assembly. In particular, these are vacuum chambers and installations for HV and UHV;* maintenance and upgrading of the existing installations and equipment in our Institute; * participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCAD graphic software (release 2000 and Mechanical Desktop 4.0) and an A0 plotter, which allow us to make drawings and 2- and 3-dimensional mechanical documentation to the world standards. The Mechanical Workshop offers a wide range of machining and treatment methods with satisfactory tolerances and surface quality. They include: * turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc type elements of a diameter up to 600 mm and a length not exceeding 300 mm, * milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm, * grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm, * drilling - holes of a diameter up to 50 mm, * welding - electrical and gas welding, including TIG vacuum-tight welding, * soft and hard soldering, * mechanical works including precision engineering, * plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides, * painting - paint spraying with possibility of using furnace-fired drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our workshop is equipped with the CNC milling machine which can be used for machining of work pieces up to 500 kg. The machine

  18. Issues and measures in the design process from the perspective of risk management of construction projects. study of power plant construction projects accident cases

    International Nuclear Information System (INIS)

    Iwahara, Hirohiko; Shiraki, Wataru; Inomo, Hitoshi; Hasegawa, Syuichi

    2015-01-01

    Construction of power plants, foundation work, consisting of a wide variety of construction work, such as plant equipment work. And, civil engineering, technician electrical such as different engineering field, is a comprehensive construction project that works for the design conditions of the structure. However, if the cooperation design conditions is not sufficient, as a construction project, the optimal structures may not be said to have been built. As a result, total cost or increased, including the initial cost of the end construction projects, it is be a cause of the accident. Previous studies, plant equipment construction, is related to safety management and risk of foundation work such as individual construction were many. In this paper, as an example the power plant construction, and performs the following discussion from the point of view of risk management of large-scale construction projects that these individual construction work together with each other. The importance of design conditions cooperation, (1) 'Challenges and countermeasures of ordering method of construction projects', to verify from the (2) 'actually happened substation foundation displacement accident'. And on whether or not the construction project order institutions can be involved in the design from the site preparation stage, we study (3) for 'construction work scope and risk control the construction project ordering institutions to implement' the risk to the natural disaster (earthquake). From these, we describe the challenges and measures in the construction project of the design process. (author)

  19. Construction technique for a chemical plant (I)

    International Nuclear Information System (INIS)

    1978-08-01

    This book mentions the order of plant construction, building plant and related regulations, basic engineering design data, provide of equipment, plan and management on building plant, quality control, the budget and contract for building plant, public works for building chemical plant like road construction, basic plan and building for a chemical plant, introduction and principle on foundation improvement method, including pile foundation and design for footing, construction and installation for a chemical plant and a rotary machine for a chemical plant.

  20. Report From BPTCS Project Team On Evaluation Of Additive Manufacturing For Pressure Retaining Equipment

    Energy Technology Data Exchange (ETDEWEB)

    Rawls, G. [Savannah River Site (SRS), Aiken, SC (United States)

    2016-09-22

    ASME is evaluating the use of additive manufacturing (AM) for the construction of pressure equipment. The information in this report assesses available AM technologies for direct metal fabrication of pressure equipment. Background information is included in the report to provide context for those not experienced in AM technology. Only commercially available technologies for direct metal fabrication are addressed in the report because these AM methods are the only viable approaches for the construction of pressure equipment. Metal AM technologies can produce near-net shape parts by using multiple layers of material from a three dimensional (3D) design model of the geometry. Additive manufacturing of metal components was developed from polymer based rapid prototyping or 3D printing. At the current maturity level, AM application for pressure equipment has the potential to reduce delivery times and costs for complex shapes. AM will also lead to a reduction in the use of high cost materials, since parts can be created with corrosion resistant layers of high alloy material and structural layers of lower cost materials.

  1. Economics of residential gas furnaces and water heaters in United States new construction market

    Energy Technology Data Exchange (ETDEWEB)

    Lekov, Alex B.; Franco, Victor H.; Wong-Parodi, Gabrielle; McMahon, James E.; Chan, Peter

    2009-05-06

    New single-family home construction represents a significant and important market for the introduction of energy-efficient gas-fired space heating and water-heating equipment. In the new construction market, the choice of furnace and water-heater type is primarily driven by first cost considerations and the availability of power vent and condensing water heaters. Few analysis have been performed to assess the economic impacts of the different combinations of space and water-heating equipment. Thus, equipment is often installed without taking into consideration the potential economic and energy savings of installing space and water-heating equipment combinations. In this study, we use a life-cycle cost analysis that accounts for uncertainty and variability of the analysis inputs to assess the economic benefits of gas furnace and water-heater design combinations. This study accounts not only for the equipment cost but also for the cost of installing, maintaining, repairing, and operating the equipment over its lifetime. Overall, this study, which is focused on US single-family new construction households that install gas furnaces and storage water heaters, finds that installing a condensing or power-vent water heater together with condensing furnace is the most cost-effective option for the majority of these houses. Furthermore, the findings suggest that the new construction residential market could be a target market for the large-scale introduction of a combination of condensing or power-vent water heaters with condensing furnaces.

  2. Air Force construction automation/robotics

    Science.gov (United States)

    Nease, AL; Dusseault, Christopher

    1994-01-01

    The Air Force has several unique requirements that are being met through the development of construction robotic technology. The missions associated with these requirements place construction/repair equipment operators in potentially harmful situations. Additionally, force reductions require that human resources be leveraged to the maximum extent possible and that more stringent construction repair requirements push for increased automation. To solve these problems, the U.S. Air Force is undertaking a research and development effort at Tyndall AFB, FL to develop robotic teleoperation, telerobotics, robotic vehicle communications, automated damage assessment, vehicle navigation, mission/vehicle task control architecture, and associated computing environment. The ultimate goal is the fielding of robotic repair capability operating at the level of supervised autonomy. The authors of this paper will discuss current and planned efforts in construction/repair, explosive ordnance disposal, hazardous waste cleanup, fire fighting, and space construction.

  3. Learning through delivery, Westinghouse AP1000 plant construction

    International Nuclear Information System (INIS)

    Gorgemans, J.; Hinman, R.D.; Steuck, C.M.; Greco, P.L.

    2014-01-01

    The AP1000 plant, which is a 1100 MWe class pressurized water reactor with passive safety features, is designed around a conventional 2 loop, 2 steam generator primary system configuration with 2 hot legs, 4 reactor coolant pumps directly mounted in the steam generator lower head and 4 cold legs. A particular feature of AP1000 is its modular construction to minimize the time and cost of construction. Modular construction allows activities to be run in parallel, it allows more activities to be performed in a controlled factory instead of in the field, and it provides a better level of quality. The AP1000 plant design includes 106 structural modules and 52 mechanical modules. Structural modules include all penetrations for piping, cable trays, HVAC duct runs, and all reinforcement for pipe, equipment hangers, and supports. Structural modules are shipped in sub-modules to support transportation by rail or truck or barge. Mechanical modules contain equipment such as pumps, tanks, heat exchangers, air-handling units, and filters along with interconnecting pipes, valves, instruments, wiring and support services. Modular construction requires strong coordination between engineering, supply chain and construction. A total of 8 AP1000 units are currently under construction in China and in the United States. The lessons learned and best practices of each new AP1000 construction are systematically incorporated into the standard design. (A.C.)

  4. Some problems of NPP construction base improvement

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction

  5. Technical preparation of the Yuzhteploehnergomontazh trust for technological equipment mounting

    International Nuclear Information System (INIS)

    Zayats, A.I.

    1982-01-01

    Measures of technical preparation for equipment mounting at the Zaporozhe NPP developed with the Yuzhteploehnergomontazh trust experts are considered. These measures envisage the construction of mounting base of heat facilities, calculation of labour contents and determination of necessary quantity of mounters, development of optimal flowsheet of mounting control, improvement of mounting qualification and creation of stable collective body, improvement of technical level of mounting and welding works, organizational-technical measures on mounting logistics. Factors affecting negatively technical preparation quality of equipment mounting at the Zaporozhe NPP are discussed. The flowsheet of mounting control is presented

  6. Construction safety in DOE. Part 2, Students guide

    Energy Technology Data Exchange (ETDEWEB)

    Handwerk, E.C.

    1993-08-01

    This report is the second part of a compilation of safety standards for construction activities on DOE facilities. This report covers the following areas: floor and wall openings; cranes, derricks, hoists, elevators, and conveyors; motor vehicles, mechanized equipment, and marine operations; excavations; concrete and masonry construction; steel erection; underground construction, caisson, cofferdams, and compressed air; demolition; blasting and the use of explosives; power transmission and distribution; rollover protective structures, overhead protection; and ladders.

  7. New technologies for lower-cost design and construction of new nuclear power plants. Annex 20

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.; Bryan, R.E.; Harmon, D.L.

    2002-01-01

    Electric Power Research Institute studies indicate that in order to be competitive with gas-fired electric power plant capital costs, new nuclear plant capital cost in the USA must be decreased by at least 35% to 40% relative to costs of some Advanced Light Water Reactors designed in the early 1990s. To address this need, the U. S. Department of Energy is sponsoring three separate projects under its Nuclear Energy Research Initiative. These projects are the Risk-Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants, the Smart Equipment Nuclear Power Plant Program, and the Design, Procure, Construct, Install and Test Program. The goal of the Design-Construction program is reduction of the complete nuclear plant design-procure-construct-install-test cycle schedule and cost. A 3D plant model was combined with a construction schedule to produce a 4D visualization of plant construction, which was then used to analyze plant construction methods. Insights include the need for concurrent engineering, a plant-wide central database, and use of the World-Wide WEB. The goal of Smart Equipment program is to design, develop, and evaluate the methods for implementing smart equipment and predictive maintenance technology. 'Smart' equipment means components and systems that are instrumented and monitored to detect incipient failures in order to improve their reliability. The resulting smart equipment methods will be combined with a more risk-informed regulatory approach to allow plant designers to (1) simplify designs without compromising overall reliability and safety and (2) maintain more reliable plants at lower cost. Initial results show that rotating equipment such as charging pumps would benefit most from smart instrumentation and that the technique of Bayesian Belief Networks would be most appropriate for providing input to a health monitoring system. (author)

  8. Space construction system analysis. Part 2: Cost and programmatics

    Science.gov (United States)

    Vonflue, F. W.; Cooper, W.

    1980-01-01

    Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.

  9. Selection of construction materials for equipment in an experimental reprocessing plant

    International Nuclear Information System (INIS)

    Mizrahi, R.; Cragnolino, G.A.

    1994-01-01

    A review is made of the most significant corrosion problems that may be present in different stages of the process in a spent fuel reprocessing plant. The influence of different variables is analyzed: concentration of nitric acid and other oxidizing species, temperature, etc., in corrosion of materials of most frequent use in pipings and equipment. The materials are austenitic stainless steels and refractory metals, especially zirconium and its alloys. Both general and localized corrosion phenomena are analyzed for these materials. Selection criteria for the use of adequate material in different components of the plant are also discussed. (author). 32 refs., 20 figs., 3 tabs

  10. A preliminary design of mechanical device on industrial digital radiography equipment design

    International Nuclear Information System (INIS)

    Nur Khasan; Samuel Praptoyo

    2015-01-01

    A preliminary design of mechanical device on industrial digital radiography equipment has been done. this design is intended as a basis for the manufacture of complete facilities for the realization a prototype on industrial digital radiography equipment. the design and construction were carried out by paying attention to the general configuration of the basic design in which its mechanical design has several components with specific dimensions and heavy mass. this design consist of a main frame holder, flat panel detector support and hydraulic hand stacker for mounting the x-ray machine. this mechanical device design will then be fabricated to facilitate and assist work of digital radiographic retrieval. computer application programs sketch-up is used to draw this design and the analysis stress of autodesk inventor to analysis the strength construction design. the results of this design are the configuration drawing, sketch drawings of construction and the safety factor of construction design with a minimum value of 2.39 as well as a maximum value of 15 when to be simulated by the load 500 Kg which is 4 times of total workload. (author)

  11. 30 CFR 18.95 - Approval of machines constructed of components approved, accepted or certified under Bureau of...

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Approval of machines constructed of components... APPROVAL OF MINING PRODUCTS ELECTRIC MOTOR-DRIVEN MINE EQUIPMENT AND ACCESSORIES Field Approval of Electrically Operated Mining Equipment § 18.95 Approval of machines constructed of components approved...

  12. Minimum radwaste system to support commercial operation-what equipment can be deferred

    International Nuclear Information System (INIS)

    Marshall, R.W.; Tafazzoli, M.M.

    1984-01-01

    Because of cash flow problems being experienced by utilities as nuclear power stations approach completion, areas of the plant for which the completion of the construction effort could be deferred past commercial operation should be reviewed. The radwaste treatment systems are prime candidates for such a deferral because of the availability, either temporary or permanent, of alternative treatment methods for the waste streams expected to be produced. In order to identify the radwaste equipment, components and associated hardware in the radwaste building which could be deferred past commercial operation, a study was performed by Impell Corporation to evaluate the existing radwaste treatment system and determine the minimum system necessary to support commercial operation of a typical BWR. The study identified the minimum-installed radwaste treatment system which, in combination with portable temporary equipment, would accommodate the waste types and quantities likely to be produced in the first few years of operation. In addition, the minimum-installed system had to be licensable and excessive radiation exposures should not be incurred during the construction of the deferred portions of the system after commercial operation. From this study, it was concluded that a significant quantity of radwaste processing equipment and the associated piping, valves and instrumentation could be deferred. The estimated savings, in construction manhours (excluding field distributables) alone, was over 102,000 M-H

  13. Division of Mechanical Construction - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    1999-01-01

    The Department of Mechanical Construction consists of the Design Group and the Mechanical Workshop. The activity of the Department includes the following: designs of devices and equipment for experiments in physics and their mechanical construction and assembly, particularly vacuum chambers and installations for HV and UHV; maintenance and upgrading of the existing installations and equipment in our Institute; participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCad graphic software (release 12 and 13) what allows to make drawings and a mechanical documentation which meets world standards. Also ANSYS (version 5.2) - a software for mechanical, heat and magnetic calculations using finite-elements methods is used in our design activity. The Mechanical Workshop can offer a wide range of machining and treatment methods with satisfactory tolerances and surface quality. In 1998 the Department of Mechanical Construction designed, manufactured and assembled an equipment for the following foreign laboratories: Deutches Elektronen Synchrotron, Hamburg, FRG; Jagiellonian University, Cracow; Massachusetts Institute of Technology, Cambridge, Massachusetts, USA; University of Rochester. Rochester, NY, USA; Brookhaven National Laboratory, Upton, NY, USA. Besides the large designs and systems described below, some interesting works have been made for the departments of our Institute and other institutions: 1. The works for Cyclotron Section: The assembly of dipole magnet for extraction the cyclotron beam: - design and manufacturing of technological device for winding magnet coils; - winding of 16 coils; - manufacturing and assembly of magnet collars driving system; - design and manufacturing of vacuum chamber placed inside the magnet; - manufacturing of magnet cooling system; assembly of remachined magnet yoke and mentioned above units

  14. Open manufacturing system using MMS service and object oriented manufacturing equipment

    International Nuclear Information System (INIS)

    Kim, Dong Hoon; Song, Jun Yeob; Kim, Sun Ho

    2007-01-01

    Manufacturing equipment should be integrated to construct CIM (Computer Integrated Manufacturing) environment, but several economical and technological difficulties may be arisen in case heterogeneous systems are integrated into each other. MMS (Manufacturing Message Specification) can be effective in such a case, but the problem is that MMS-related products are comparatively expensive and the existing manufacturing equipment mostly do not support MMS. This study was focused on developing a gateway suitable to a non-MMS-compatible CNC machine-tool, and on implementing OSI (Open System Interconnection) upper layer on TCP/IP. The development system was applied to a cell controller by means of heterogeneous equipment under CIM environment, and to evaluate interoperability and portability

  15. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  16. Fabulous Facilities: New Constructions and Renovations.

    Science.gov (United States)

    American Libraries, 1997

    1997-01-01

    Renovation and construction projects in 18 public and academic libraries across the United States are showcased, with 23 photographs illustrating library interiors and exteriors. Discussion centers on architecture, costs, technology infrastructure and equipment, preservation of old facilities, furniture, and library functions. (AEF)

  17. Investigation equipment and methods used by Posiva

    International Nuclear Information System (INIS)

    Oehberg, A.

    2006-10-01

    Posiva Oy, a company jointly owned by TVO and Fortum, submitted an application for the Decision in Principle to the Finnish Government in May 1999. A positive decision was made at the end of 2000 by the Government. The Finnish Parliament ratified the Decision in Principle on the final disposal facility for spent nuclear fuel at Olkiluoto, Eurajoki in May 2001. The decision makes it possible for Posiva to focus the confirming bedrock investigations at Olkiluoto, where in the next few years an underground research facility, ONKALO, for rock characterisation for the final disposal of spent nuclear fuel will be constructed. The construction of the ONKALO access tunnel was started in September 2004. This report describes the investigation methods and equipment developed and used by Posiva Oy during the confirming site investigations from the surface. The report covers the areas of drilling of deep investigation holes, geophysical loggings, geophysical ground and tunnel surveys, hydrogeological and hydrogeochemical as well as rock mechanical methods. Emphasis is given on those equipment and methods developed by Posiva and those that have frequently and recently been used in the Posiva's characterisation programmes including methods applied during excavation of ONKALO access tunnel. The database used for the field investigation data is also briefly described in this report. (orig.)

  18. 46 CFR 160.013-3 - Materials, workmanship, and construction details.

    Science.gov (United States)

    2010-10-01

    ... 46 Shipping 6 2010-10-01 2010-10-01 false Materials, workmanship, and construction details. 160.013-3 Section 160.013-3 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT... materials, workmanship, and construction details shall be in substantial compliance with the provisions of...

  19. Grinding efficiency improvement of hydraulic cylinders parts for mining equipment

    Directory of Open Access Journals (Sweden)

    Korotkov Aleksandr

    2017-01-01

    Full Text Available The aim of the article is to find out ways to improve parts treatment and components of mining equipment on the example of hydraulic cylinders parts, used as pillars for mine roof supports, and other actuator mechanisms. In the course of the research work methods of machine retaining devices design were used, the scientific approaches for the selection of progressive grinding schemes were applied; theoretical and practical experience in the design and production of new constructions of grinding tools was used. As a result of this work it became possible to create a progressive construction of a machine retaining device for grinding of large parts of hydraulic cylinders, to apply an effective scheme of rotary abrasive treatment, to create and implement new design of grinding tools by means of grains with controllable shape and orientation. Implementation of the results obtained in practice will improve the quality and performance of repairing and manufacturing of mining equipment.

  20. Design and fabrication of equipment and devices for a Radiotherapy department

    International Nuclear Information System (INIS)

    Picon, C.L.; Zaharia B, M.

    1998-01-01

    The objective of this work is to present the possibility to design and construct utilizing local technology, a series of equipment and devices necessaries for a routine in a Radiotherapy Department with typical budget in the Latin-American hospitals. (Author)

  1. Field size and centring for conventional X-ray equipment

    International Nuclear Information System (INIS)

    Klimpel, H.; Kreienfeld, H.; Overbeck, R.

    1989-01-01

    Since 1973, all X-ray equipment for medical applications in the Federal Republic of Germany has had to be examined according to the requirements of the German ''Rontgenverordnung'' before it is used on patients and after each essential modification of design or construction. These examinations are carried out by inspectors appointed by the authorities, e.g. TUV. The field size adjustment and the centring of the radiation beam in relation to the image reception area is checked, along with other tests. To increase quality assurance in X-ray diagnosis, since the mid-1980s X-ray equipment has also been subject to in-service inspections to an increasing extent. (author)

  2. The construction of solid waste form test facility

    International Nuclear Information System (INIS)

    Park, Hun Hwee; Kim, Joon Hyung; Lee, Byung Jik; Koo, Jun Mo; Kim, Jeong Guk; Jung, In Ha

    1990-03-01

    The solid waste form test facility (SWFTF) to test and/or evaluate the characteristics of waste forms, such as homogeniety, mechanical properties, thermal properties, waste resistance and leachability, have been constructed, and some equipments for testing actual waste forms has been purchased; radiocative monitoring system, glove box for the manipulator repair room, and uninteruppted power supply system, et al. Classifications of radioactive wastes, basic requirements and criteria to be considered during waste management were also reviewed. Some of the described items above have been standardized for the purpose of indigenigation. Therefore, safety assurance of waste forms, as well as increase in the range of participating of domestic companies in construction of further nuclear facilities could be obtained as results through constructing this facility. In the furture this facility is going to be utilized not only for the inspection of waste forms but also for the periodic decontamination for extending the life time of some expensive radiological equipments using remote handling techniques. (author)

  3. Construction of pipelines on marshlands during summer months with the aid of gang assembly platforms

    Energy Technology Data Exchange (ETDEWEB)

    Kovalev, E P; Girshovich, I I

    1979-05-01

    Because the massive size of conventional pipeline-construction equipment limits its use in swampy areas to winter months, the USSR's SKB Gazstroimashina developed a new system to allow year-round construction activity. The equipment consists of five mobile platforms arranged in series along the pipeline to spread out the load for a lower specific ground pressure than exerted by conventional equipment. Platforms perform the successive functions of emplacement of the pipe lengths, end preparation, welding, cleanup, and insulation. So far, two sets of gang-assembly platforms have been built and are being field-tested.

  4. Design ampersand construction innovations of the defense waste processing facility

    International Nuclear Information System (INIS)

    McKibben, J.M.; Pair, C.R.; Bethmann, H.K.

    1990-01-01

    Construction of the Defense Waste Processing Facility (DWPF) at the Savannah River Site (SRS) is essentially complete. The facility is designed to convert high-level radioactive waste, now contained in large steel tanks as aqueous salts and sludge, into solid borosilicate glass in stainless steel canisters. All processing of the radioactive material and operations in a radioactive environment will be done remotely. The stringent requirements dictated by remote operation and new approaches to the glassification process led to the development of a number of first-of-a-kind pieces of equipment, new construction fabrication and erection techniques, and new applications of old techniques. The design features and construction methods used in the vitrification building and its equipment were to accomplish the objective of providing a state-of-the-art vitrification facility. 3 refs., 10 figs

  5. Leasing instruments of high-rise construction financing

    Science.gov (United States)

    Aleksandrova, Olga; Ivleva, Elena; Sukhacheva, Viktoria; Rumyantseva, Anna

    2018-03-01

    The leasing sector of the business economics is expanding. Leasing instruments for high-rise construction financing allow to determine the best business behaviour in the leasing economy sector, not only in the sphere of transactions with equipment and vehicles. Investments in high-rise construction have a multiplicative effect. It initiates an active search and leasing instruments use in the economic behaviour of construction organizations. The study of the high-rise construction sector in the structure of the leasing market participants significantly expands the leasing system framework. The scheme of internal and external leasing process factors influence on the result formation in the leasing sector of economy is offered.

  6. The effects of mechanised equipment on physical load among road workers and floor layers in the construction industry

    NARCIS (Netherlands)

    Burdorf, A.; Windhorst, J.; Beek, A.J. van der; Molen, H. van der; Swuste, P.H.J.J.

    2007-01-01

    This study describes the impact of the use of mechanised equipment on physical load and workers' health among road workers and floor layers by comparing the traditional manual work method with frequently occurring scenarios of use of this new equipment. Continuous direct measurements of postures

  7. The Mexican market for electrical equipment and services

    International Nuclear Information System (INIS)

    Robinson, J.

    1994-05-01

    Most of Mexico's electric power needs are supplied by the Comision Federal de Electricidad (CFE). Total installed capacity is ca 33,000 MW, of which ca 42% comes from oil-fired generation and 26% hydroelectric. Electricity consumption is expected to grow at ca 6%/y between 1993 and 2000; to meet this demand, CFE plans to build nearly 14,000 MW of additional generating capacity to cost ca $34 billion. A new law governing the electric power sector recently privatized electrical project construction and provided for private financing. Construction of all larger generation and transmission projects has been privatized, thereby deregulating and simplifying the bidding process for Canadian firms wishing to bid, subcontract, or supply equipment or materials. The most notable opportunities for Canadian firms are in transmission projects. The Mexican electrical manufacturing industry comprises ca 2,000 firms employing 150,000 people. Branch plants of global firms plus domestic companies supply over 70% of market demand. Production of equipment and materials for the electrical sector is well integrated with suppliers and customers, and manufacturers are seeking imports to replace abandoned product lines as the industry rationalizes. These, along with more sophisticated equipment not made in Mexico, provide opportunities for Canadian suppliers. The North American Free Trade Agreement gives preference to Canadians over offshore competitors, and eliminates many barriers to exports. Canada's Export Development Corporation provides financing with a line of credit for the electrical sector. Marketing in Mexico is best done through personal visits and capable local representation. A directory of Mexican electrical manufacturers who import is appended. 1 tab

  8. Concerning equipment procurement for NPPs

    International Nuclear Information System (INIS)

    Pana, N.

    2002-01-01

    After a stagnation in investments for nuclear power which extended over a period of 10-15 years, assessments done by energy forecast institutes, as well as, evaluations by UE institutions, OECD, and DOE (USA) point to the conclusion solid and argued that the electric energy of nuclear origin will record a new boost beginning probably with the year 2005. Particular efforts were concentrated upon improving the performances of existing plants and, on the other hand, towards new, evolutionary concepts in nuclear engineering. Advanced equipment for nuclear reactors and plants resulted and were already implemented. In Europe construction of both advanced PWR and BWR type reactors are underway. The paper consider the issues of Romanian nuclear power and presents the prospects for advanced CANDU reactors in connection with the Romania's infrastructure and necessities. The problem of modernizing the equipment and components for NPP is discussed in the context of financing and investment conditions. In conclusion, the share of nuclear power in Romania is expected to rise in order to compensate the decline in fossil fuel thermal power and to better solve the environmental issues

  9. Urgent reconstruction and re-equipping of coking plants

    Energy Technology Data Exchange (ETDEWEB)

    Kvitkin, I.A.; Martynenko, V.M.; Rozenfel' d, M.S.; Svyatogorov, A.A.; Shvartsman, I.G.

    1986-03-01

    This paper discusses the various options involved: complete or partial reconstruction of existing buildings and equipment or new construction with new equipment and new underground and surface communications. It explains that reconstruction work is divided into three phases: initial phase (clearance, dismantling, closing down coking batteries); basic phase (fitting heat-resistant materials, prestart-up assembly work); final phase (drying out, heating up, adjustments, start-up). A structured scheme for a typical initial phase is described and a method of calculating the durations of the various phases is discussed. Conclusion is that there is an urgent requirement for a document to be produced for the control of reconstruction work; it should contain standard durations and could serve as a standard for coking plant reconstruction work.

  10. REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Mladen Zelenika

    1998-12-01

    Full Text Available A Contractor usually utilizes the available drilling equipment when constructing just one single well. Drilling cost and time consumption in constructing the well MB-1, using the percussion method, and the well MB-2, using the conventional rotary drilling method, call for a separate analysis in order to justify the investment cost for the acquisition of additional equipment for a single well only. The wells, located in a karst vrtača close to an estavelle near Tomislavgrad, with a diameter of 500 mm and approximately 80 m deep, have been accomplished with a low rate of penetration using the conventional Cable tool and resp. Rotary Drilling Method. In this paper results of analyses for the given circumstances are shown: both the efficiency and cost of the mentioned drilling methods performed by the crews of »Geotehnika d.d.« Zagreb, as well as the justifiability of investments in new equipment are evaluated.

  11. Use of operator-provided, installed C/S equipment in IAEA safeguards

    International Nuclear Information System (INIS)

    Shea, T.; Rundquist, D.; Gaertner, K.; Yellin, E.

    1987-01-01

    Developing solutions for complex safe guards problems in close cooperation with Operators is becoming more common, especially as the IAEA continues to operate under zero-growth limitations. This has in practice taken on various forms; from the extreme case of very specific equipment developed and constructed by the State/Operator for use in only one facility, to the more normal case where only the development is carried out by the State/Operator. This practice has advantages and disadvantages. For example, to ensure that Agency inspections will be carried out in a predictable manner, it will be in the Operator's interest to ensure that any equipment he provides is of the highest quality, meets all national safety requirements, and is installed and maintained in such a manner that it will provide years of service. Agency equipment performs its intended function in a reliable manner, but with very specific, limited applications in mind, improvements in reliability over that obtained with normal Agency equipment are to be expected. Also, the authors experience is that reaching acceptable arrangements for the use of State- of Operator-supplied equipment is often far more straightforward than when arranging to apply Agency equipment

  12. Materials selection for process equipment in the Hanford waste vitrification plant

    Energy Technology Data Exchange (ETDEWEB)

    Elmore, M R; Jensen, G A

    1991-07-01

    The Hanford Waste Vitrification Plant (HWVP) is being designed to vitrify defense liquid high-level wastes and transuranic wastes stored at Hanford. The HWVP Functional Design Criteria (FDC) requires that materials used for fabrication of remote process equipment and piping in the facility be compatible with the expected waste stream compositions and process conditions. To satisfy FDC requirements, corrosion-resistant materials have been evaluated under simulated HWVP-specific conditions and recommendations have been made for HWVP applications. The materials recommendations provide to the project architect/engineer the best available corrosion rate information for the materials under the expected HWVP process conditions. Existing data and sound engineering judgement must be used and a solid technical basis must be developed to define an approach to selecting suitable construction materials for the HWVP. This report contains the strategy, approach, criteria, and technical basis developed for selecting materials of construction. Based on materials testing specific to HWVP and on related outside testing, this report recommends for constructing specific process equipment and identifies future testing needs to complete verification of the performance of the selected materials. 30 refs., 7 figs., 11 tabs.

  13. The definition of basic parameters of the set of small-sized equipment for preparation of dry mortar for various applications

    Directory of Open Access Journals (Sweden)

    Emelyanova Inga

    2017-01-01

    Full Text Available Based on the conducted information retrieval and review of the scientific literature, unsolved issues have been identified in the process of preparation of dry construction mixtures in the conditions of a construction site. The constructions of existing technological complexes for the production of dry construction mixtures are considered and their main drawbacks are identified in terms of application in the conditions of the construction site. On the basis of the conducted research, the designs of technological sets of small-sized equipment for the preparation of dry construction mixtures in the construction site are proposed. It is found out that the basis for creating the proposed technological kits are new designs of concrete mixers operating in cascade mode. A technique for calculating the main parameters of technological sets of equipment is proposed, depending on the use of the base machine of the kit.

  14. ATLAS, Construction of a Giant

    CERN Multimedia

    McCubbin, Norman

    2004-01-01

    One of the most impressive aspects of modern particle physics in the scale of the equipment. The accelerators require the construction of underground tunnels many kilometers long containing evacuated pipes through which beams of particles travel at incredibly high energies. Even more spectacular are the gigantic complex assemblies that make up the experiments themselves

  15. Code of practice for the safe use of industrial radiography equipment (1989)

    International Nuclear Information System (INIS)

    1989-12-01

    This code supersedes the Code of practice for the control and safe handling of sealed radioactive sources used in industrial radiography, published by the National Health and Medical Research Council (NHMRC) in 1968. It differs significantly from the former code because radiation protection practice and recommended standards have changed. The code covers the design, construction and requirements for the safe use of X-radiography equipment and gamma-radiography equipment. It provides illustrative working rules, detailed emergency procedures and comprehensive responsibilities and duties for all personnel involved in supplying and using industrial radiography equipment. The code details those equipment requirements, personnel requirements and work practices that the NHMRC considers necessary to keep exposures to ionizing radiation as low as reasonably achievable. Some equipment and facilities currently in use may not meet all of the mandatory requirements of this code. These requirements have been included in the code to encourage progress towards future compliance in the expectation that, in the interim, statutory authorities will apply them with discretion

  16. Construction work for prototype fast breeder reactor MONJU

    International Nuclear Information System (INIS)

    Suzuki, Yasuyuki; Tsuji, Koichi; Shimizu, Hisashi

    1991-01-01

    The main construction work of MONJU was started from the excavation for building foundation in October 1985, the containment vessel was prepared in April 1987, the reactor vessel was installed in October 1988, and the installation of the whole equipment was completed in April 1991. Fuji Electric made preparations for construction matching the above master schedule in consideration of construction schedule quality assurance and safety and accomplished the work within the scheduled time without personal injury as long as 2.35 million hours. (author)

  17. Economics of residential gas furnaces and water heaters in United States new construction market

    OpenAIRE

    Lekov, Alex B.

    2009-01-01

    New single-family home construction represents a significant and important market for the introduction of energy-efficient gas-fired space heating and water-heating equipment. In the new construction market, the choice of furnace and water-heater type is primarily driven by first cost considerations and the availability of power vent and condensing water heaters. Few analysis have been performed to assess the economic impacts of the different combinations of space and water-heating equipment....

  18. [Discipline construction is the theme of the development of burn surgery].

    Science.gov (United States)

    Jia, C Y

    2018-03-20

    Discipline construction is the core element of department development, including discipline structure setting, scale, equipment, medical workers structure, clinical feature and advantage, talent training, teaching level, scientific research level, management system, and cultural construction of department. As leader and engine of discipline construction, directors' ability is an important factor for discipline construction. Clinical characteristic is the basis of discipline construction; innovation actuation is the essence of discipline construction; talents training is the guarantee of discipline construction; scientific research is the wing of discipline construction; cultural construction is the hot spring of discipline construction. Discipline construction is the theme of the development of burn surgery.

  19. A novel high performance stopped-flow apparatus equipped with a special constructed mixing chamber containing a plunger under inert condition with a very short dead-time to investigate very rapid reactions

    Directory of Open Access Journals (Sweden)

    Sayyed Mostafa Habibi Khorassani

    2015-11-01

    Full Text Available The present work set out to establish a novel stopped-flow instrument equipped with a special constructed mixing chamber containing a plunger to enable a kinetic study of the very rapid reactions under a dry inert atmosphere glove bag, in particular, for the reactions are sensitive to moisture or air. A stopped-flow spectrophotometer is essentially a conventional spectrophotometer with the addition of a system for rapid mixing of solutions. The purpose of this work is to describe the fabrication and evaluation of specially constructed and in-expensive stopped-flow system. The evaluation includes determination of the dead-time, relative mixing efficiency, and the measurement of known rate constants. Herein, a dead-time of about 3.4 ms was determined in the final modified construction of the stopped-flow apparatus in order to investigate the rapid initial during which some form of reaction intermediate is presented to be formed.

  20. Electrical and control equipment in nuclear power plants. Problems when replacing aging equipment; El och kontrollutrustning i kaernkraftverk - Problematik vid utbyte av aaldrad utrustning

    Energy Technology Data Exchange (ETDEWEB)

    Nordling, Anna; Haakansson, Goeran

    2012-11-01

    Interoperability between different technical systems is more complicated when old and new technology meet, such as between analog and digital technology. New electrical and I and C equipment is selected with consideration to simplify and improve the compatibility and interoperability. The original construction of nuclear power plants with electricity and I and C equipment had more natural interfaces. Generally experienced guidance, to the management of interoperability and interfaces, feels insufficient. Skills transfer programs are identified as a major need, as more and more important personnel are retiring and important information is lost with them. Lack of appropriate skills directly affects the ability to produce accurate and complete requirements specification. Failure modes of newer electrical and I and C equipment are perceived as more complex than the older equipment. When choosing equipment, attempts are made to minimize unnecessary features, to reduce the number of potential failure modes. There is a lack of consistent understanding of the meaning of robustness in electrical technology and I and C technology, in the nuclear plant engineering departments. The overall picture is that the robustness has worsened since the facilities were built. The Swedish nuclear power plants have an internal organizational structure with separated client and support organization. This splits the nuclear organization into two distinct parts which threaten to separate the two entities focus. Engineering departments at the Swedish nuclear power plants express a need for increased expertise in the client organization (blocks). Competence requested is for example, system knowledge to facilitate and enhance the quality of the initial analysis performed in the blocks. Suppliers receive more recently larger turnkey projects, both to minimize costs but also to minimize the interfaces and co-function problems. This, however, heightens demands for knowledge transfer between

  1. Regulations for pressurized equipment in the European Single Market - construction of steam boilers, containers and pipelines

    International Nuclear Information System (INIS)

    Grassmuck, J.

    1992-01-01

    The impulses produced by the data of the standardized EC Single Market have now reached pressurized equipment in the field of EC Guidelines and European standardisation. This must be regarded as a great challenge to the interested and concerned parties. All efforts to represent the interested parties in European Committees must be made. In order to reach the goal quickly and successfully, a considerable readiness to compromise is, however, necessary. At the end of the development process, a comprehensible, standardized set of regulations will be available for pressurized equipment throughout Europe. The regulations will consist of national ones converted into European Guidelines and Standards. (orig.) [de

  2. Modularization Technology in Power Plant Construction

    International Nuclear Information System (INIS)

    Kenji Akagi; Kouichi Murayama; Miki Yoshida; Junichi Kawahata

    2002-01-01

    Since the early 1980's, Hitachi has been developing and applying modularization technology to domestic nuclear power plant construction, and has achieved great rationalization. Modularization is one of the plant construction techniques which enables us to reduce site labor by pre-assembling components like equipment, pipes, valves and platforms in congested areas and installing them using large capacity cranes for cost reduction, better quality, safety improvement and shortening of construction time. In this paper, Hitachi's modularization technologies are described especially from with respect to their sophisticated design capabilities. The application of 3D-CAD at the detailed layout design stage, concurrent design environment achieved by the computer network, module design quantity control and the management system are described. (authors)

  3. 29 CFR 1926.1000 - Rollover protective structures (ROPS) for material handling equipment.

    Science.gov (United States)

    2010-07-01

    ... 29 Labor 8 2010-07-01 2010-07-01 false Rollover protective structures (ROPS) for material handling equipment. 1926.1000 Section 1926.1000 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY... CONSTRUCTION Rollover Protective Structures; Overhead Protection § 1926.1000 Rollover protective structures...

  4. 77 FR 71607 - Mobile Offshore Drilling Unit (MODU) Electrical Equipment Certification Guidance

    Science.gov (United States)

    2012-12-03

    ... DEPARTMENT OF HOMELAND SECURITY Coast Guard [Docket No. USCG-2012-0839] Mobile Offshore Drilling... hazardous areas on foreign-flagged Mobile Offshore Drilling Units (MODUs) that have never operated, but... International Maritime Organization (IMO) Code for the Construction and Equipment of Mobile Offshore Drilling...

  5. Generation of equipment response spectrum considering equipment-structure interaction

    International Nuclear Information System (INIS)

    Lee, Sang Hoon; Yoo, Kwang Hoon

    2005-01-01

    Floor response spectra for dynamic response of subsystem such as equipment, or piping in nuclear power plant are usually generated without considering dynamic interaction between main structure and subsystem. Since the dynamic structural response generally has the narrow-banded shapes, the resulting floor response spectra developed for various locations in the structure usually have high spectral peak amplitudes in the narrow frequency bands corresponding to the natural frequencies of the structural system. The application of such spectra for design of subsystems often leads to excessive design conservatisms, especially when the equipment frequency and structure are at resonance condition. Thus, in order to provide a rational and realistic design input for dynamic analysis and design of equipment, dynamic equipment-structure interaction (ESI) should be considered in developing equipment response spectrum which is particularly important for equipment at the resonance condition. Many analytical methods have been proposed in the past for developing equipment response spectra considering ESI. However, most of these methods have not been adapted to the practical applications because of either the complexities or the lack of rigorousness of the methods. At one hand, mass ratio among the equipment and structure was used as an important parameter to obtain equipment response spectra. Similarly, Tseng has also proposed the analytical method for developing equipment response spectra using mass ratio in the frequency domain. This method is analytically rigorous and can be easily validated. It is based on the dynamic substructuring method as applied to the dynamic soil-structure interaction (SSI) analysis, and can relatively easily be implemented for practical applications without to change the current dynamic analysis and design practice for subsystems. The equipment response spectra derived in this study are also based on Tseng's proposed method

  6. Characteristics of worker accidents on NYSDOT construction projects.

    Science.gov (United States)

    Mohan, Satish; Zech, Wesley C

    2005-01-01

    This paper aims at providing cost-effective safety measures to protect construction workers in highway work zones, based on real data. Two types of accidents that occur in work zones were: (a) construction work area accidents, and (b) traffic accidents involving construction worker(s). A detailed analysis of work zone accidents involving 36 fatalities and 3,055 severe injuries to construction workers on New York State Department of Transportation (NYSDOT) construction projects from 1990 to 2001 established that five accident types: (a) Struck/Pinned by Large Equipment, (b) Trip or Fall (elevated), (c) Contact w/Electrical or Gas Utility, (d) Struck-by Moving/Falling Load, and (e) Crane/Lift Device Failure accounted for nearly 96% of the fatal accidents, nearly 63% of the hospital-level injury accidents, and nearly 91% of the total costs. These construction work area accidents had a total cost of $133.8 million. Traffic accidents that involve contractors' employees were also examined. Statistical analyses of the traffic accidents established that five traffic accident types: (a) Work Space Intrusion, (b) Worker Struck-by Vehicle Inside Work Space, (c) Flagger Struck-by Vehicle, (d) Worker Struck-by Vehicle Entering/Exiting Work Space, and (e) Construction Equipment Struck-by Vehicle Inside Work Space accounted for nearly 86% of the fatal, nearly 70% of the hospital-level injury and minor injury traffic accidents, and $45.4 million (79.4%) of the total traffic accident costs. The results of this paper provide real statistics on construction worker related accidents reported on construction work zones. Potential preventions based on real statistics have also been suggested. The ranking of accident types, both within the work area as well as in traffic, will guide the heavy highway contractor and owner agencies in identifying the most cost effective safety preventions.

  7. An open software system based on X Windows for process control and equipment monitoring

    International Nuclear Information System (INIS)

    Aimar, A.; Carlier, E.; Mertens, V.

    1992-01-01

    The construction and application of a configurable open software system for process control and equipment monitoring can speed up and simplify the development and maintenance of equipment specific software as compared to individual solutions. The present paper reports the status of such an approach for the distributed control systems of SPS and LEP beam transfer components, based on X Windows and the OSF/Motif tool kit and applying data modeling and software engineering methods. (author)

  8. 9 CFR 590.502 - Equipment and utensils; PCB-containing equipment.

    Science.gov (United States)

    2010-01-01

    ... Sanitary Standards and accepted practices currently in effect for such equipment. (c) New or replacement equipment or machinery (including any replacement parts) brought onto the premises of any official plant... equipment and machinery, and any replacement parts for such equipment and machinery. Totally enclosed...

  9. Customized lifting multiwavelet packet information entropy for equipment condition identification

    International Nuclear Information System (INIS)

    Chen, Jinglong; Zi, Yanyang; He, Zhengjia; Chen, Xuefeng; Zuo, Ming J; Yuan, Jing

    2013-01-01

    Condition identification of mechanical equipment from vibration measurement data is significant to avoid economic loss caused by unscheduled breakdowns and catastrophic accidents. However, this task still faces challenges due to the complexity of equipment and the harsh environment. This paper provides a possibility for equipment condition identification by proposing a method called customized lifting multiwavelet packet information entropy. Benefiting from the properties of multi-resolution analysis and multiple wavelet basis functions, the multiwavelet method has advantages in characterizing non-stationary vibration signals. In order to realize the accurate detection and identification of the condition features, a customized lifting multiwavelet packet is constructed via a multiwavelet lifting scheme. Then the vibration signal from the mechanical equipment is processed by the customized lifting multiwavelet packet transform. The relative energy in each frequency band of the multiwavelet packet transform coefficients that equals a percentage of the whole signal energy is taken as the probability. The normalized information entropy is obtained based on the relative energy to describe the condition of a mechanical system. The proposed method is applied to the condition identification of a rolling mill and a demountable disk–drum aero-engine. The results support the feasibility of the proposed method in equipment condition identification. (paper)

  10. NDT in submarines construction-HY 80

    International Nuclear Information System (INIS)

    Russo, C.A.; Talmadge, J.

    1988-01-01

    In submarines construction, provided that metallurgic characteristics have been established, the NDT methods and equipments as well as the application ways should be taken into account. It is then fundamental purpose of this work to emphasize all that coming from conventional context in the field of use of already known nondestructive techniques

  11. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  12. Code of practice for the safe use of industrial radiography equipment (1989)

    International Nuclear Information System (INIS)

    1989-12-01

    This code supersedes the Code of Practice for the control and safe handling of sealed radioactive sources use din industrial radiography, published by the National Health and Medical Research Council (NHMRC) in 1968. It differs significantly from the former code because radiation protection practice and recommended standards have changed. The code covers the design, construction and requirements for the safe use of X-radiography equipment and gamma-radiography equipment. It provides illustrative working rules, detailed emergency procedures and comprehensive responsibilities and duties for all personnel involved in supplying and using industrial radiography equipment. The code details those equipment requirements, personnel requirements and work practices that the NHMRC considers necessary to keep exposures to ionizing radiation as low as reasonably achievable. Some equipment and facilities currently in use may not meet all of the mandatory requirements of this code. These requirements have been included in the code to encourage progress towards future compliance in the expectation that, in the interim, statutory authorities will apply them with discretion. 9 refs., tabs., ills

  13. Equipment considerations

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Trace or ultratrace analyses require that the HPLC equipment used, including the detector, be optimal for such determinations. HPLC detectors are discussed at length in Chapter 4; discussion here is limited to the rest of the equipment. In general, commercial equipment is adequate for trace analysis; however, as the authors approach ultratrace analysis, it becomes very important to examine the equipment thoroughly and optimize it, where possible. For this reason they will review the equipment commonly used in HPLC and discuss the optimization steps. Detectability in HPLC is influenced by two factors (1): (a) baseline noise or other interferences that lead to errors in assigning the baseline absorbance; (b) peak width. 87 refs

  14. Integrated risk management for improving internal traffic control, work-zone safety, and mobility during major construction.

    Science.gov (United States)

    2012-10-01

    Highway construction is among the most dangerous industries in the US. Internal traffic control design, along with how construction : equipment and vehicles interact with the traveling public, have a significant effect on how safe a highway construct...

  15. Medical Issues: Equipment

    Science.gov (United States)

    ... Information Packets Equipment Pool Living With SMA Medical Issues Palliative Breathing Orthopedics Nutrition Equipment Daily Life At ... curesma.org > support & care > living with sma > medical issues > equipment Equipment Individuals with SMA often require a ...

  16. Ballooning test equipment for use in hot cells

    International Nuclear Information System (INIS)

    Broendsted, P.; Adrian, F.

    1979-12-01

    An equipment for testing the LOCA behaviour of irradiated cladding materials is described. The details of the construction and of the installation in the Hot Cells are reported. Pilot tests carried out showed that the performance of the system fulfills the basic experimental prerequisites, which were: heating rate of 2-3degC/s, final temperature 1150degC/s, internal pressure max. 30 atm, external pressure max. 1 atm, test atmosphere either air or steam. (author)

  17. Construction and commissioning of workrooms for handling of unsealed radioactive materials

    International Nuclear Information System (INIS)

    Weinhold, G.; Jost, E.; Koenig, W.

    1976-03-01

    The requirements prescribed for planning, design and construction of type II and III workrooms for handling of unsealed sources are outlined. The 'Guide Concerning Construction and Equipment of Rooms for Handling of Radioactive Materials' is explained and supplemented in part. Furthermore, problems of radiation protection organization and measuring techniques are discussed. (author)

  18. GHG emission quantification for pavement construction projects using a process-based approach

    Directory of Open Access Journals (Sweden)

    Charinee Limsawasd

    2017-03-01

    Full Text Available Climate change and greenhouse gas (GHG emissions have attracted much attention for their impacts upon the global environment. Initiating of new legislation and regulations for control of GHG emissions from the industrial sectors has been applied to address this problem. The transportation industries, which include operation of road pavement and pavement construction equipment, are the highest GHG-emitting sectors. This study presents a novel quantification model of GHG emissions of pavement construction using process-based analysis. The model is composed of five modules that evaluate GHG emissions. These are: material production and acquisition, (2 material transport to a project site, (3 heavy equipment use, (4 on-site machinery use, and, (5 on-site electricity use. The model was applied to a hypothetical pavement project to compare the environmental impacts of flexible and rigid pavement types during construction. The resulting model can be used for evaluation of environmental impacts, as well as for designing and planning highway pavement construction.

  19. Quality assurance during site construction. Pt. 6

    International Nuclear Information System (INIS)

    Schwarz, N.

    1980-01-01

    Scope of 'Site Construction concerning Electrical Equipment' (Installation, erection, commissioning, operation): tasks and organization of Siemens-Field Services Division; organization on site; receiving, incoming inspection and storage of material; installation, erection; (drawings, instructions, documents / execution of installation / personnel qualification). Non conformance and corrective actions; quality records; internal audits. (orig.)

  20. Simulation Environment Synchronizing Real Equipment for Manufacturing Cell

    Science.gov (United States)

    Inukai, Toshihiro; Hibino, Hironori; Fukuda, Yoshiro

    Recently, manufacturing industries face various problems such as shorter product life cycle, more diversified customer needs. In this situation, it is very important to reduce lead-time of manufacturing system constructions. At the manufacturing system implementation stage, it is important to make and evaluate facility control programs for a manufacturing cell, such as ladder programs for programmable logical controllers (PLCs) rapidly. However, before the manufacturing systems are implemented, methods to evaluate the facility control programs for the equipment while mixing and synchronizing real equipment and virtual factory models on the computers have not been developed. This difficulty is caused by the complexity of the manufacturing system composed of a great variety of equipment, and stopped precise and rapid support of a manufacturing engineering process. In this paper, a manufacturing engineering environment (MEE) to support manufacturing engineering processes using simulation technologies is proposed. MEE consists of a manufacturing cell simulation environment (MCSE) and a distributed simulation environment (DSE). MCSE, which consists of a manufacturing cell simulator and a soft-wiring system, is emphatically proposed in detail. MCSE realizes making and evaluating facility control programs by using virtual factory models on computers before manufacturing systems are implemented.

  1. Process and equipment qualification of the ceramic and metal waste forms for spent fuel treatment

    International Nuclear Information System (INIS)

    Marsden, Ken; Knight, Collin; Bateman, Kenneth; Westphal, Brian; Lind, Paul

    2005-01-01

    The electrometallurgical process for treating sodium-bonded spent metallic fuel at the Materials and Fuels Complex of the Idaho National Laboratory separates actinides and partitions fission products into two waste forms. The first is the metal waste form, which is primarily composed of stainless steel from the fuel cladding. This stainless steel is alloyed with 15w% zirconium to produce a very corrosion-resistant metal which binds noble metal fission products and residual actinides. The second is the ceramic waste form which stabilizes fission product-loaded chloride salts in a sodalite and glass composite. These two waste forms will be packaged together for disposal at the Yucca Mountain repository. Two production-scale metal waste furnaces have been constructed. The first is in a large argon-atmosphere glovebox and has been used for equipment qualification, process development, and process qualification - the demonstration of process reliability for production of the DOE-qualified metal waste form. The second furnace will be transferred into a hot cell for production of metal waste. Prototype production-scale ceramic waste equipment has been constructed or procured; some equipment has been qualified with fission product-loaded salt in the hot cell. Qualification of the remaining equipment with surrogate materials is underway. (author)

  2. Construction safety program for the National Ignition Facility, Appendix A

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    Topics covered in this appendix include: General Rules-Code of Safe Practices; 2. Personal Protective Equipment; Hazardous Material Control; Traffic Control; Fire Prevention; Sanitation and First Aid; Confined Space Safety Requirements; Ladders and Stairways; Scaffolding and Lift Safety; Machinery, Vehicles, and Heavy Equipment; Welding and Cutting-General; Arc Welding; Oxygen/Acetylene Welding and Cutting; Excavation, Trenching, and Shoring; Fall Protection; Steel Erection; Working With Asbestos; Radiation Safety; Hand Tools; Electrical Safety; Nonelectrical Work Performed Near Exposed High-Voltage Power-Distribution Equipment; Lockout/Tagout Requirements; Rigging; A-Cranes; Housekeeping; Material Handling and Storage; Lead; Concrete and Masonry Construction

  3. Construction safety program for the National Ignition Facility, Appendix A

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-06-26

    Topics covered in this appendix include: General Rules-Code of Safe Practices; 2. Personal Protective Equipment; Hazardous Material Control; Traffic Control; Fire Prevention; Sanitation and First Aid; Confined Space Safety Requirements; Ladders and Stairways; Scaffolding and Lift Safety; Machinery, Vehicles, and Heavy Equipment; Welding and Cutting-General; Arc Welding; Oxygen/Acetylene Welding and Cutting; Excavation, Trenching, and Shoring; Fall Protection; Steel Erection; Working With Asbestos; Radiation Safety; Hand Tools; Electrical Safety; Nonelectrical Work Performed Near Exposed High-Voltage Power-Distribution Equipment; Lockout/Tagout Requirements; Rigging; A-Cranes; Housekeeping; Material Handling and Storage; Lead; Concrete and Masonry Construction.

  4. Evaluation of Design Models of Process Equipment for Use in PRIDE: Remote Operability and Maintainability

    International Nuclear Information System (INIS)

    Kim, Ki Ho; Kim, Sung Hyun; Yu, Seung Nam; Lee, Jong Kwang; Park, Byung Suk; Han, Jong Hui; Cho, Il Je; Lee, Han Soo

    2012-01-01

    Process equipment for pyroprocessing are being developed at KAERI (Korea Atomic Energy Research Institute). Those equipment should be operated and maintained in a fully remote manner in the argon gas filled cell of PRIDE (PyRoprocess Integrated inactive DEmonstration facility) at KAERI because direct human access to the in-cell is not possible during an operation due to the high toxicity of the argon gas. To make such process equipment remotely operable and maintainable, their design developments have been tested and evaluated in a simulator before they are constructed. A simulator as a means of evaluating the remote operability and maintainability of the design models of process equipment for pyroprocessing is described, and results of the design models tested and evaluated in a simulator are presented

  5. Methodology for reducing energy and resource costs in construction of trenchless crossover of pipelines

    Science.gov (United States)

    Toropov, V. S.

    2018-05-01

    The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.

  6. Qinshan CANDU project open top construction method

    International Nuclear Information System (INIS)

    Petrunik, K.J.; Wittann, K.; Khan, A.; Ricciuti, R.; Ivanov, A.; Chen, S.

    2003-01-01

    The significant schedule reductions achieved on the Qinshan CANDU Project were due in large part to the incorporation of advanced construction technologies in project design and delivery. For the Qinshan Project, a number of key advantages were realized through the use of the 'Open Top' construction method. This paper discusses the Qinshan Phase III CANDU Project Open Top implementation method. The Open Top method allowed major equipment to be installed simply, via the use of a Very Heavy Lift (VHL) crane and permitted the use of large-scale modularization. The advantages of Open Top construction, such as simplified access, more flexible project scheduling, improved construction safety and quality, and reduced labours are presented. The large-scale modularization of the Reactor Building Dousing System and the Open Top installation method and advantages relative to traditional CANDU 6 construction practices are also presented. Finally, major improvements for future CANDU plant construction using the Open Top method are discussed. (author)

  7. Life extension of low and medium voltage equipment

    International Nuclear Information System (INIS)

    Bharteey, B.M.; Hart, T.J.

    1990-01-01

    Nuclear plant life extension is becoming a very important issue with the passing of each day. Within 3 to 10 years after the turn of the century, licenses of a number of nuclear power plants in the United States will expire. For the near future, new construction of nuclear power plants in the United States is expected to be inhibited, if the current economic and regulatory environment continues to persist. This situation, coupled with aging of utility equipment and the high cost of financing new construction is resulting in a growing emphasis on preserving and extending the capability of existing power plants. Until now, the utilities have placed more emphasis on high cost items, but experience shows that extending life of low cost of device/components in items like Motor Control Center Centers and switchgear pays big dividends. According to the current practice, devices of these items are replaced at the end of their assigned qualified life or attended to when there is a problem resulting in an unplanned outage. In this paper based on extensive experience in the field of motor control centers and medium switchgear, the authors proposed a cookbook methodology to determine the extent or absence of degradation and establish trends of the pertinent operational properties of devices of this type of equipment. The test results also provide satisfactory evidence of class 1E nuclear safety-related function

  8. Reactor PIK construction

    International Nuclear Information System (INIS)

    Konoplev, Kir

    2003-01-01

    The construction work at the 100 MW researches reactor PIK in year 2002 was in progress. The main activity was concentrated on mechanical, ventilation and electrical equipment. Some systems and subsystems are under adjustment. Hydraulic driving gear for beam shutters are finished in installation, rinsing, and adjusting. Regulating rods test assembling was done. On the critical assembly the first reactor fueling was tested to evaluate the starting neutron source intensity and a sufficiency of existing control and instrument board. Mainline of the PIK facility design and neutron parameters are presented. (author)

  9. Introduction of characteristics and construction methods for Lungmen NPP

    International Nuclear Information System (INIS)

    Hur, Kyung Phil; Manager, General

    2007-01-01

    Daewoo Engineering and Construction Co., Ltd. has taken part in the construction of ABWR (Advance Boiling Water Reactor of capacity of 1,350MW) at Lungmen site in Taiwan since 1999 as a member of Joint Company for the Nuclear Island Civil Work and Nuclear Island Equipment and Piping Work. This paper discusses the introduction of NSSS of ABWR and the major construction methods applied to Lungmen Nuclear Power Plants. Even though there is no BWR or ABWR type of Nuclear Power Plants built in Korea, the information and data related to the newly advanced construction technologies which has been already applied successfully is very important for the future overseas expansion

  10. Analysis of performance reliability of electrical and electronic equipment of car-tractor

    Directory of Open Access Journals (Sweden)

    Kravchenko О.Р.

    2016-08-01

    Full Text Available The analysis of the operational reliability of electrical and electronic equipment of vehicles, trucks Mercedes-Benz Actros 1844 LS and Volvo FH 1242, conducting international cargo transportation is performed. It is established that the equipment is reliable, which meets modern requirements, but where there is a violation of the resolution. The reason for repair work is constructive and operational factors. Distribution of efficiency and overall performance of operational reliability is retrieved. Items with more bounce are found. Common factors of violation of efficiency cars, trucks in operation, are largely different stages in warranty runs are obtained.

  11. Regulatory Activities on Civil Nuclear Safety Equipment in China

    International Nuclear Information System (INIS)

    Gaoshang, Lu; Choi, Kwang Sik

    2011-01-01

    It is stipulated in IAEA Fundamental Safety Principles (SF1) that the fundamental safety objective is to protect people and the environment from harmful effects of ionizing radiation. The fundamental safety objective applies for all facilities and activities and for all stages over the lifetime of a facility or radiation source, including planning, sitting, design, manufacturing, construction, commissioning and operation, as well as decommissioning and closure. So, according to the requirement, the related activities such as design, manufacturing, installation and non-destructive test that conducted on civil nuclear equipment should be well controlled by the vendors, the owner of the nuclear power plants and the regulatory body. To insure the quality of those equipment, Chinese government had taken a series of measures to regulate the related activities on them

  12. IFR fuel cycle process equipment design environment and objectives

    International Nuclear Information System (INIS)

    Rigg, R.H.

    1993-01-01

    Argonne National laboratory (ANL) is refurbishing the hot cell facility originally constructed with the EBR-II reactor. When refurbishment is complete, the facility win demonstrate the complete fuel cycle for current generation high burnup metallic fuel elements. These are sodium bonded, stainless steel clad fuel pins of U-Zr or U-Pu-Zr composition typical of the fuel type proposed for a future Integral Fast Reactor (IFR) design. To the extent possible, the process equipment is being built at full commercial scale, and the facility is being modified to incorporate current DOE facility design requirements and modem remote maintenance principles. The current regulatory and safety environment has affected the design of the fuel fabrication equipment, most of which will be described in greater detail in subsequent papers in this session

  13. A Study of the potency of construction service industries to support the first nuclear power plant construction in Indonesia

    International Nuclear Information System (INIS)

    Dharu Dewi; Sriyana

    2008-01-01

    The study was conducted to identify the potency of construction service industries to participate in nuclear power plant program in Indonesia. The potency is identified by evaluation results of national industries potency in some multinational construction service industries. The research methodology chosen was the survey method by sending questionnaires, visits to National industries, interview, and literature study. The data collection technique was sampling purposive. Data can be obtained from both primary and secondary data. The study results showed that the performance of construction service industries to support the NPP program must be increased through the selection of competent human resources, reliable equipment and an effective and efficient project management system, so that they can be expected to play necessary role in the nuclear power plant construction in Indonesia. (author)

  14. Design and construction of the gamma ray transmission tomographer g-TAC-02

    International Nuclear Information System (INIS)

    Pavon Hernandez, Noriel; Ravelo Sanchez, Alberto; Idel, Pedro; Macias Perez, Rafael; Garcia Trapaga, Cesar; Campos Montenegro, Augusto

    2000-01-01

    An equipment for gamma ray transmission tomographer was designed and constructed in the Higher Institute of Nuclear Sciences and Technology. It was the g-TAC-01, based on a nuclear instrumentation, a mechanic instrumentation, and the control of the system from a personal computer. This first version permitted to obtain the know how of the technology of construction of equipment for tomography. The present work describes the second version of the gamma ray transmission tomographer: the g-TAC-02, with very important upgrading in the control session. Now the control system is a microcontroller based, electronic control system, designed to work in multiples forms: manual, automatic and with the computer

  15. Design and construction of a resistivity meter for shallow investigation

    African Journals Online (AJOL)

    Design and construction of a resistivity meter for shallow investigation. ... Nigerian Journal of Physics. Journal Home ... Consequently many institutions that need this equipment for teaching and research purposes cannot afford the price.

  16. Production equipment development needs for a 700 metric ton/year light water reactor mixed oxide fuel manufacturing plant

    International Nuclear Information System (INIS)

    Blahnik, D.E.

    1977-09-01

    A literature search and survey of fuel suppliers was conducted to determine how much development of production equipment is needed for a 700 metric tons/y LWR mixed-oxide (UO 2 --PuO 2 ) fuel fabrication plant. Results indicate that moderate to major production equipment development is needed in the powder and pellet processing areas. The equipment in the rod and assembly processing areas need only minor development effort. Required equipment development for a 700 MT/y plant is not anticipated to delay startup of the plant. The development, whether major or minor, can be done well within the time frame for licensing and construction of the plant as long as conventional production equipment is used

  17. Research on Health State Perception Algorithm of Mining Equipment Based on Frequency Closeness

    Directory of Open Access Journals (Sweden)

    Gang Wang

    2014-06-01

    Full Text Available The health state perception of mining equipment is intended to have an online real- time knowledge and analysis of the running conditions of large mining equipments. Due to its unknown failure mode, a challenge was raised to the traditional fault diagnosis of mining equipments. A health state perception algorithm of mining equipment was introduced in this paper, and through continuous sampling of the machine vibration data, the time-series data set was set up; subsequently, the mode set based on the frequency closeness was constructed by the d neighborhood method combined with the TSDM algorithm, thus the forecast method on the basis of the dual mode set was eventually formed. In the calculation of the frequency closeness, the Goertzel algorithm was introduced to effectively decrease the computation amount. It was indicated through the simulation test on the vibration data of the drum shaft base that the health state of the device could be effectively distinguished. The algorithm has been successfully applied to equipment monitoring in the Huoer Xinhe Coal Mine of Shanxi Coal Imp&Exp. Group Co., Ltd.

  18. A Model of Intelligent Fault Diagnosis of Power Equipment Based on CBR

    Directory of Open Access Journals (Sweden)

    Gang Ma

    2015-01-01

    Full Text Available Nowadays the demand of power supply reliability has been strongly increased as the development within power industry grows rapidly. Nevertheless such large demand requires substantial power grid to sustain. Therefore power equipment’s running and testing data which contains vast information underpins online monitoring and fault diagnosis to finally achieve state maintenance. In this paper, an intelligent fault diagnosis model for power equipment based on case-based reasoning (IFDCBR will be proposed. The model intends to discover the potential rules of equipment fault by data mining. The intelligent model constructs a condition case base of equipment by analyzing the following four categories of data: online recording data, history data, basic test data, and environmental data. SVM regression analysis was also applied in mining the case base so as to further establish the equipment condition fingerprint. The running data of equipment can be diagnosed by such condition fingerprint to detect whether there is a fault or not. Finally, this paper verifies the intelligent model and three-ratio method based on a set of practical data. The resulting research demonstrates that this intelligent model is more effective and accurate in fault diagnosis.

  19. Electrical equipment qualification

    International Nuclear Information System (INIS)

    Farmer, W.S.

    1983-01-01

    Electrical equipment qualification research programs being carried out by CEA, JAERI, and Sandia Laboratories are discussed. Objectives of the program are: (1) assessment of accident simulation methods for electrical equipment qualification testing; lower coarse (2) evaluation of equipment aging and accelerated aging methods; (3) determine radiation dose spectrum to electrical equipment and assess simulation methods for qualification; (4) identify inadequacies in electrical equipment qualification procedures and standards and potential failure modes; and (5) provide data for verifying and improving standards, rules and regulatory guides

  20. Study of National Electric System equipment until 2000 year

    International Nuclear Information System (INIS)

    1980-01-01

    The report by the German firm Lahmeyer International is about the historical development of the supply of Electric Power, description of the current system, previous studies, organization, power plants, hydroelectric plants and existing construction, transmission system, hydrological studies and water resources, operation of hydro thermal generation, medium-term demand, energy sources and generation in the medium term, list of thermal plants, evaluation of alternative equipment plans in Uruguay at a med dium term.

  1. 76 FR 70166 - Electrical Standards for Construction and General Industry; Extension of the Office of Management...

    Science.gov (United States)

    2011-11-10

    ...] Electrical Standards for Construction and General Industry; Extension of the Office of Management and Budget... contained in the Electrical Standards for Construction (29 CFR part 1926, Subpart K) and for General... maintenance of electric utilization equipment that prevent death and serious injuries among construction and...

  2. SYSTEM OF STANDARTIZATION OF CONSTRUCTION OPERATIONS ARRANGEMENT

    Directory of Open Access Journals (Sweden)

    Oleynik Pavel Pavlovich

    2012-10-01

    Full Text Available In the proposed article, management of construction operations is represented as a multi-level system; it is considered with the framework of projects including new construction, restructuring and overhaul of buildings and structures. The system of management of construction operations is to be composed of the following three constituent parts. They include a construction and assembling entity, project and operations, and a procurement base. Such matters as the quality of construction products, purchase (lease of building machinery and vehicles are incorporated into the level of the construction and assembling entity. The project level comprises such components of construction operations management as pre-construction preparation of a project, methods and forms of construction management, preparatory works, management of construction activities, real-time operations control, construction quality control, etc. The level of operations and the procurement base covers the needs for materials and equipment, their purchase and procurement, as well as the warehouse management. The main elements of the standardization system are identified. Standards of construction operations management are explained, including 1. General Provisions; 2. Preparation and performance of construction and assembling works; 3. New construction. Building site organization; 4. Demolition (dismantling of buildings and structures; 5. Rules of preparation for acceptance and commissioning of completed residential buildings. The prospects for the further development of the system of standardization of construction operations management are outlined

  3. Guidelines for evaluation of anchorage adequacy for safety-related equipment typically used on WWER-type NPPs

    International Nuclear Information System (INIS)

    Masopust, R.

    1999-01-01

    This report describes the criteria which should be met when the capacity evaluation of anchorage of safety related equipment is performed for the WWER type NPPs. It should be noted that these criteria were developed specifically for anchorage of WWER type equipment and components to the concrete or steel building structures and they cover different types of anchor bolts and other anchorage details which are typical just for the existing, constructed or reconstructed WWER type NPPs. The screening approach for verifying of equipment anchorage presented in this report is based on a combination of inspections, calculations, and engineering judgement

  4. Organization of the construction and schedule of realization

    International Nuclear Information System (INIS)

    Szerovay, Antal; Vogel, Oszkar

    1988-01-01

    The four units of the Paks nuclear power plant with all the auxiliary and service facilities were constructed between 1974 and 1987. Major features of building activities, types of buildings classified according to the connection between the facility and the technology are listed. Processes and structures applied to the construction of the main reactor building are mentioned emphasizing the importance of up-to-date building methods. To move the large equipment into the reactor building Potain cranes of 400 Mp were used. As a result of adequate schedule the auxiliary buildings could be used as preparatory buildings during the construction of the plant. The energy and material supply, the schedule of the construction works are discussed. (V.N.) 6 refs.; 5 figs

  5. Indigenous lunar construction materials

    Science.gov (United States)

    Rogers, Wayne P.; Sture, Stein

    1991-01-01

    The utilization of local resources for the construction and operation of a lunar base can significantly reduce the cost of transporting materials and supplies from Earth. The feasibility of processing lunar regolith to form construction materials and structural components is investigated. A preliminary review of potential processing methods such as sintering, hot-pressing, liquification, and cast basalt techniques, was completed. The processing method proposed is a variation on the cast basalt technique. It involves liquification of the regolith at 1200-1300 C, casting the liquid into a form, and controlled cooling. While the process temperature is higher than that for sintering or hot-pressing (1000-1100 C), this method is expected to yield a true engineering material with low variability in properties, high strength, and the potential to form large structural components. A scenario for this processing method was integrated with a design for a representative lunar base structure and potential construction techniques. The lunar shelter design is for a modular, segmented, pressurized, hemispherical dome which could serve as habitation and laboratory space. Based on this design, estimates of requirements for power, processing equipment, and construction equipment were made. This proposed combination of material processing method, structural design, and support requirements will help to establish the feasibility of lunar base construction using indigenous materials. Future work will refine the steps of the processing method. Specific areas where more information is needed are: furnace characteristics in vacuum; heat transfer during liquification; viscosity, pouring and forming behavior of molten regolith; design of high temperature forms; heat transfer during cooling; recrystallization of basalt; and refinement of estimates of elastic moduli, compressive and tensile strength, thermal expansion coefficient, thermal conductivity, and heat capacity. The preliminary

  6. 46 CFR 159.005-15 - Approval of equipment or material: Suspensions, withdrawals, and terminations.

    Science.gov (United States)

    2010-10-01

    ..., withdrawals, and terminations. 159.005-15 Section 159.005-15 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) EQUIPMENT, CONSTRUCTION, AND MATERIALS: SPECIFICATIONS AND APPROVAL APPROVAL OF..., withdrawals, and terminations. (a) The Commandant suspends an approval issued under this subchapter in...

  7. Safety systems I/C equipment reliability analyses of the Kozloduy NPP units 3 and 4

    Energy Technology Data Exchange (ETDEWEB)

    Halev, G; Christov, N [Risk Engineering Ltd., Sofia (Bulgaria)

    1996-12-31

    The purpose of the analysis is to assess the safety systems I/C equipment reliability. The assessment includes: quantification of the safety systems unavailability due to component failures; definition of the minimal cut sets leading to the analysed safety systems failure; quantification of the I/C equipment importance measures of the dominant contribution components. The safety systems I/C equipment reliability has been analysed using PSAPACK (a code for probabilistic safety assessment). Fault trees for the following safety systems of the Kozloduy-3 and Kozloduy-4 reactors have been constructed: neutron flow control equipment, reactor protection system, main coolant pumps, pressurizer safety valves `Sempell`, steam dump systems, spray system, low pressure injection system, emergency feeding water system, essential service water system. THree separate reports have been issued containing the performed analyses and results. 1 ref.

  8. Availability of Life Support Equipment and its Utilization by Ambulance Drivers.

    Science.gov (United States)

    Acharya, Rija; Badhu, Angur; Shah, Tara; Shrestha, Sharmila

    2017-09-08

    An effective ambulance is a vital requirement for providing an emergency medical service. Well-equipped ambulances with trained paramedics can save many lives during the golden hours of trauma care. The objective was to document the availability and utilization of basic life support equipment in the ambulances and to assess knowledge on first aid among the drivers. Descriptive design was used. Total of 109 ambulances linked to B.P. Koirala Institute of Health Sciences were enrolled using purposive sampling method. Self- constructed observation checklist and semi structured interview schedule was used for data collection. More than half of the respondents had less than five years of experience and were not trained in first aid. About two-third of the respondents had adequate knowledge on first aid. About 90% of the ambulance had oxygen cylinder and adult oxygen mask which was 'usually' used equipment. More than half of ambulance had equipment less than 23% as compared to that of national guidelines. There was significant association of knowledge with the experience (p = 0.004) and training (p = 0.001). Availability of equipment was associated with training received (p = 0.007),organization (p= 0.032)and district (p = 0.023) in which the ambulance is registered. The study concludes that maximum ambulance linked to BPKIHS, Nepal did not have even one fourth of the equipment for basic life support. Equipment usually used was oxygen cylinder and oxygen mask. Majority of driver had adequate knowledge on first aid and it was associated with training and experience.

  9. Guidelines for nuclear reactor equipments safety-analysis

    International Nuclear Information System (INIS)

    1978-01-01

    The safety analysis in approving the applications for nuclear reactor constructions (or alterations) is performed by the Committee on Examination of Reactor Safety in accordance with various guidelines prescribed by the Atomic Energy Commission. In addition, the above Committee set forth its own regulations for the safety analysis on common problems among various types of nuclear reactors. This book has collected and edited those guidelines and regulations. It has two parts: Part I includes the guidelines issued to date by the Atomic Energy Commission: and Part II - regulations of the Committee. Part I has collected 8 categories of guidelines which relate to following matters: nuclear reactor sites analysis guidelines and standards for their applications; standard exposure dose of plutonium; nuclear ship operation guidelines; safety design analysis guidelines for light-water type, electricity generating nuclear reactor equipments; safety evaluation guidelines for emergency reactor core cooling system of light-water type power reactors; guidelines for exposure dose target values around light-water type electricity generating nuclear reactor equipments, and guidelines for evaluation of above target values; and meteorological guidelines for the safety analysis of electricity generating nuclear reactor equipments. Part II includes regulations of the Committee concerning - the fuel assembly used in boiling-water type and in pressurized-water type reactors; techniques of reactor core heat designs, etc. in boiling-water reactors; and others

  10. Automatization of welding for nuclear power equipments and facilities

    International Nuclear Information System (INIS)

    Tamai, Yasumasa; Matsumoto, Teruo; Koyama, Takaichi

    1980-01-01

    For the requirement of high reliability in the construction of nuclear power plants and the reduction of radiation exposure in the modefying works of existing plants, the automation and remote operation of welding have increased their necessity. In this paper, the present state of the automation of welding for making machines, equipments and pipings for nuclear power plants in Hitachi Ltd. is described, and the aim of developing the automation, the features of the equipments and the state of application to actual plants are introduced, centering around the automation of welding for large structures such as reactor containment vessels and the remote type automatic welding system for pipings. By these automations, the large outcomes were obtained in the improvement of welding quality required for the machines and equipments for atomic energy. Moreover, the conspicuous results were also obtained in case of the peculiar works to nuclear power plants, in which the reduction of the radiation exposure related to human bodies and the welding of high quality are demanded. The present state of the automation of welding for nuclear installations in Hitachi Ltd., the development of automatic welding equipments and the present state of application to actual plants, and the development and application of the automatic pipe working machine for reducing radiation exposure are explained. (Kako, I.)

  11. Extension of operational systems in computers of common use for application in systems for experimental equipment control

    International Nuclear Information System (INIS)

    Demidov, M.A.; Makarov, V.V.; Solov'ev, G.N.

    1985-01-01

    The problems of constructing specialized software for large complexes of experimental equipment and its functioning with serial operating systems (OS) are discussed. The main concepts being the base of dispatching software construction (an applied program package) extending the ES OS potentialities being used in the IHEP system for automatic data acquisition and accelerator control are considered

  12. Performativity and the Politics of Equipping for Calculation

    DEFF Research Database (Denmark)

    Henriksen, Lasse Folke

    2013-01-01

    This article argues that the concept of performativity deepens our understanding of contemporary, expertise-driven processes of global economic governance. Tracing the World Bank's role in constructing a global market for microfinance, the paper suggests that the World Bank was instrumental...... in translating selected parts of economic models into practice, thereby changing microfinance practices globally. Socio-technical networks centered on the World Bank were created to equip actors to become part of a global market, which incorporated not only donors but also commercial investors. The paper makes...

  13. Design guides for radioactive-material-handling facilities and equipment

    International Nuclear Information System (INIS)

    Doman, D.R.; Barker, R.E.

    1980-01-01

    Fourteen key areas relating to facilities and equipment for handling radioactive materials involved in examination, reprocessing, fusion fuel handling and remote maintenance have been defined and writing groups established to prepare design guides for each areas. The guides will give guidance applicable to design, construction, operation, maintenance and safety, together with examples and checklists. Each guide will be reviewed by an independent review group. The guides are expected to be compiled and published as a single document

  14. EM-18-2008 regulation. Essential requirements for the registration of medical equipment

    International Nuclear Information System (INIS)

    2015-01-01

    This rule lays down additional rules for the evaluation and the State Control of Medical Equipment provisions. Medical equipment must be designed and constructed so that they are used under the conditions and for the intended purpose and shall, where applicable, by virtue of the technical knowledge, experience, education or training of users, do not compromise the clinical condition or safety of patients, or the safety and health of users or, where applicable, other persons, assuming that any risks that may be associated with their use constitute acceptable risks versus the benefits for the patient and is compatible with a high level of protection of health and safety.

  15. Present construction status and future plan of JT-60

    Energy Technology Data Exchange (ETDEWEB)

    Iso, Yasuhiko; Yoshikawa, Masaji [Japan Atomic Energy Research Inst., Tokai, Ibaraki. Tokai Research Establishment

    1982-04-01

    As for the critical plasma test facility JT-60, its detailed design was initiated in 1975, and the manufacture of the main body components was started in April, 1978, through the trial manufacture and development of important components. The manufacture of all the system equipment in factories is in progress. Especially, the essential components of main body have been almost completed, and ready to be installed in the building. The building is under construction, and a part of the equipment was brought in and installed since the beginning of 1982 fiscal year. JT-60 is composed of heating system, toroidal magnetic field coil power supply, poloidal magnetic field coil power supply, total control system, associated system for main body and various measuring equipment as well as the main body which consists of vacuum vessel, toroidal and poloidal magnetic field coils, base, primary cooling system, movable limiter and evacuating system. In this report, first the significance of JT-60 development and the outline of JT-60 are described, and the present construction status is reported. The specifications of the essential equipment of the main body and heating system and the measuring system configuration are listed in tables. The aims in JT-60 design are to make plasma generating pulse width longer, to obtain higher beta value in circular cross-section plasma, to install the magnetic limiter, and to realize compound second stage heating.

  16. Usability improvement of x-ray food inspection equipment

    International Nuclear Information System (INIS)

    Ohira, Norihiro; Yamaguchi, Takashi; Ohara, Mamoru; Shimizu, Hideaki; Kamimura, Kunio; Saiki, Hideo

    2010-01-01

    To properly set up X-ray inspection equipment of foreign bodies in foods properly has become more and more complicated and time-consuming, because digital image processing used in it has more parameters for more precise inspecting. In this paper, it is reported some methods to lighten the work load of workers who set up the parameters. Using Statistical methods, we construct an auto setting lookup table for adjusting contrast and parameters of inspection algorithm. With the former we confirmed an expansion of a range of grey levels that include domain of foreign bodies in sample data. Furthermore, with we constructed in our former research, we can set automatically limit of parameters that judge input product's image to be not including foreign bodies. It is suitable for food inspection system, since users prefer severely inspecting of foreign products. (author)

  17. Hitachi's experience and achievements in ABWR construction

    International Nuclear Information System (INIS)

    Inoue, Takashi; Miura, Jun; Murayama, Kouichi

    2003-01-01

    Hitachi, Ltd. (Hitachi) is taking charge of the turbine island of Chubu Electric Power Company's Hamaoka nuclear power plant Unit No. 5 (Hamaoka 5), and all facilities of Hokuriku Electric Power Company's Shika Nuclear Power Station Unit No. 2 (Shika 2). Hitachi has achieved shorter schedules and lower costs in the two projects with the following construction methods. First, Hitachi applied modularization and the area-by-area method. These methods enable us to undertake building and installation work in parallel. Second, the floor packaging construction method enables us to finish installation in every area earlier than conventional methods. Moreover, manpower can be distributed evenly. This paper reports the application of these advanced construction methods to the Hamaoka 5 and Shika 2 projects. Installations such as RCCV modules and condenser blocks are presented in this paper. In addition, Hitachi is using 3D-CAD engineering and our own construction management system to optimize the planning of construction procedures and the installation of equipment in these projects. Thus Hitachi is always striving to improve the reliability, safety and economy of ABWR construction technologies. (author)

  18. Projecting pipeline construction by AutoDesk Map; Projektierung von Rohrleitungsbaumassnahmen mit AutoDesk Map

    Energy Technology Data Exchange (ETDEWEB)

    Taschendorf, M.; Voigtlaender, M. [Hamburger Wasserwerke GmbH, Hamburg (Germany)

    2005-12-15

    Presented is AutoDesk Map, which enables the construction and planning of big grids for water- and gas supply. In this example industrial equipment is driven as objects in AutoDesk Map. Therefore the consistence of the data is guaranted and comprehensive CAD functions are available for industrial equipment and topologies. (GL)

  19. Construction method of pre assembled unit of bolt sphere grid

    Science.gov (United States)

    Hu, L. W.; Guo, F. L.; Wang, J. L.; Bu, F. M.

    2018-03-01

    The traditional construction of bolt sphere grid has many disadvantages, such as high cost, large amount of work at high altitude and long construction period, in order to make up for these shortcomings, in this paper, a new and applicable construction method is explored: setting up local scaffolding, installing the bolt sphere grid starting frame on the local scaffolding, then the pre assembled unit of bolt sphere grid is assembled on the ground, using small hoisting equipment to lift pre assembled unit to high altitude and install. Compared with the traditional installation method, the construction method has strong practicability and high economic efficiency, and has achieved good social and economic benefits.

  20. Department of Energy Construction Safety Reference Guide

    Energy Technology Data Exchange (ETDEWEB)

    1993-09-01

    DOE has adopted the Occupational Safety and Health Administration (OSHA) regulations Title 29 Code of Federal Regulations (CFR) 1926 ``Safety and Health Regulations for Construction,`` and related parts of 29 CFR 1910, ``Occupational Safety and Health Standards.`` This nonmandatory reference guide is based on these OSHA regulations and, where appropriate, incorporates additional standards, codes, directives, and work practices that are recognized and accepted by DOE and the construction industry. It covers excavation, scaffolding, electricity, fire, signs/barricades, cranes/hoists/conveyors, hand and power tools, concrete/masonry, stairways/ladders, welding/cutting, motor vehicles/mechanical equipment, demolition, materials, blasting, steel erection, etc.

  1. Mechanisation and automation technologies development in work at construction sites

    Science.gov (United States)

    Sobotka, A.; Pacewicz, K.

    2017-10-01

    Implementing construction work that creates buildings is a very complicated and laborious task and requires the use of various types of machines and equipment. For years there has been a desire for designers and technologists to introduce devices that replace people’s work on machine construction, automation and even robots. Technologies for building construction are still being developed and implemented to limit people’s hard work and improve work efficiency and quality in innovative architectonical and construction solutions. New opportunities for improving work on the construction site include computerisation of technological processes and construction management for projects and processes. The aim of the paper was to analyse the development of mechanisation, automation and computerisation of construction processes and selected building technologies, with special attention paid to 3D printing technology. The state of mechanisation of construction works in Poland and trends in its development in construction technologies are presented. These studies were conducted on the basis of the available literature and a survey of Polish construction companies.

  2. Process equipment waste and process waste liquid collection systems

    International Nuclear Information System (INIS)

    1990-06-01

    The US DOE has prepared an environmental assessment for construction related to the Process Equipment Waste (PEW) and Process Waste Liquid (PWL) Collection System Tasks at the Idaho Chemical Processing Plant. This report describes and evaluates the environmental impacts of the proposed action (and alternatives). The purpose of the proposed action would be to ensure that the PEW and PWL collection systems, a series of enclosed process hazardous waste, and radioactive waste lines and associated equipment, would be brought into compliance with applicable State and Federal hazardous waste regulations. This would be accomplished primarily by rerouting the lines to stay within the buildings where the lined floors of the cells and corridors would provide secondary containment. Leak detection would be provided via instrumented collection sumps locate din the cells and corridors. Hazardous waste transfer lines that are routed outside buildings will be constructed using pipe-in-pipe techniques with leak detection instrumentation in the interstitial area. The need for the proposed action was identified when a DOE-sponsored Resource Conservation and Recovery Act (RCRA) compliance assessment of the ICPP facilities found that singly-contained waste lines ran buried in the soil under some of the original facilities. These lines carried wastes with a pH of less than 2.0, which were hazardous waste according to the RCRA standards. 20 refs., 7 figs., 1 tab

  3. Construction quality assurance report

    International Nuclear Information System (INIS)

    Roscha, V.

    1994-01-01

    This report provides a summary of the construction quality assurance (CQA) observation and test results, including: The results of the geosynthetic and soil materials conformance testing. The observation and testing results associates with the installation of the soil liners. The observation and testing results associated with the installation of the HDPE geomembrane liner systems. The observation and testing results associated with the installation of the leachate collection and removal systems. The observation and testing results associated with the installation of the working surfaces. The observation and testing results associated with in-plant manufacturing process. Summary of submittal reviews by Golder Construction Services, Inc. The submittal and certification of the piping material specifications. The observation and verification associated of the Acceptance Test Procedure results of the operational equipment functions. Summary of the ECNs which are incorporated into the project

  4. Thermal fatigue equipment to test joints of materials for high heat flux components

    International Nuclear Information System (INIS)

    Visca, E.; Libera, S.; Orsini, A.; Riccardi, B.; Sacchetti, M.

    2000-01-01

    The activity, carried out in the framework of an ITER divertor task, was aimed at defining a suitable method in order to qualify junctions between armour materials and heat sink of plasma-facing components (PFCs) mock-ups. An equipment able to perform thermal fatigue testing by electrical heating and active water-cooling was constructed and a standard for the sample was defined. In this equipment, during operation cycles, two samples are heated by thermal contact up to a relevant temperature value (350 deg. C) and then the water flow is switched on, thus producing fast cooling with time constants and gradients close to the real operating conditions. The equipment works with a test cycle of about 60 s and is suitable for continuous operation. A complete test consists of about 10000 cycles. After the assembling, the equipment and the control software were optimized to obtain a good reliability. Preliminary tests on mock-ups with flat CFC tiles joined to copper heat sink were performed. Finite-elements calculations were carried out in order to estimate the value of the thermal stresses arising close to the joint under the transient conditions that are characteristic of this equipment

  5. Construction techniques and management methods for BWR plants

    International Nuclear Information System (INIS)

    Shimizu, Yohji; Tateishi, Mizuo; Hayashi, Yoshishige

    1989-01-01

    Toshiba is constantly striving for safer and more efficient plant construction to realize high-quality BWR plants within a short construction period. To achieve these aims, Toshiba has developed and improved a large number of construction techniques and construction management methods. In the area of installation, various techniques have been applied such as the modularization of piping and equipment, shop installation of reactor internals, etc. Further, installation management has been upgraded by the use of pre-installation review programs, the development of installation control systems, etc. For commissioning, improvements in commissioning management have been achieved through the use of computer systems, and testing methods have also been upgraded by the development of computer systems for the recording and analysis of test data and the automatic adjustment of controllers in the main control system of the BWR. This paper outlines these construction techniques and management methods. (author)

  6. Accuracy Improvement of Real-Time Location Tracking for Construction Workers

    Directory of Open Access Journals (Sweden)

    Hyunsoo Kim

    2018-05-01

    Full Text Available Extensive research has been conducted on the real-time locating system (RTLS for tracking construction components, including workers, equipment, and materials, in order to improve construction performance (e.g., productivity improvement or accident prevention. In order to prevent safety accidents and make more sustainable construction job sites, the higher accuracy of RTLS is required. To improve the accuracy of RTLS in construction projects, this paper presents a RTLS using radio frequency identification (RFID. For this goal, this paper develops a location tracking error mitigation algorithm and presents the concept of using assistant tags. The applicability and effectiveness of the developed RTLS are tested under eight different construction environments and the test results confirm the system’s strong potential for improving the accuracy of real-time location tracking in construction projects, thus enhancing construction performance.

  7. Using a detailed inventory of a large wastewater treatment plant to estimate the relative importance of construction to the overall environmental impacts.

    Science.gov (United States)

    Morera, Serni; Corominas, Lluís; Rigola, Miquel; Poch, Manel; Comas, Joaquim

    2017-10-01

    The aim of this work is to quantify the relative contribution to the overall environmental impact of the construction phase compared to the operational phase for a large conventional activated sludge wastewater treatment plant (WWTP). To estimate these environmental impacts, a systematic procedure was designed to obtain the detailed Life Cycle Inventories (LCI) for civil works and equipment, taking as starting point the construction project budget and the list of equipment installed at the Girona WWTP, which are the most reliable information sources of materials and resources used during the construction phase. A detailed inventory is conducted by including 45 materials for civil works and 1,240 devices for the equipment. For most of the impact categories and different life spans of the WWTP, the contribution of the construction phase to the overall burden is higher than 5% and, especially for metal depletion, the impact of construction reaches 63%. When comparing to the WWTP inventories available in Ecoinvent the share of construction obtained in this work is about 3 times smaller for climate change and twice higher for metal depletion. Concrete and reinforcing steel are the materials with the highest contribution to the civil works phase and motors, pumps and mobile and transport equipment are also key equipment to consider during life cycle inventories of WWTPs. Additional robust inventories for similar WWTP can leverage this work by applying the factors (kg of materials and energy per m 3 of treated water) and guidance provided. Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Constructability - from Qinshan to the ACR

    International Nuclear Information System (INIS)

    Elgohary, M.; Fairclough, N.; Ricciuti, R.

    2003-01-01

    AECL has recognised the importance of Constructability for many years and is applying its principals to CANDU projects with increasing success. Constructability is defined as the consideration of construction knowledge and experience during all phases of a project, and recognizes that maximum benefit can be achieved during the concept phases of a project. The CANDU 6 Nuclear Power Plant has been constructed eleven times in the last 25 years, however, the last two units being completed on the Qinshan project in China have employed some very innovative construction methods that have not been used on the previous units. In order to make nuclear power generation more competitive, shorter construction schedules and reduced project costs and risks are essential objectives. The application of constructability principles is a major contributor to achieving these objectives. The success of Qinshan has increased the confidence in the new construction methods which are being implemented on the ACR (Advanced CANDU Reactor) successfully. An ACR construction strategy that utilizes advanced construction techniques has been developed by AECL. The strategy includes paralleling of activities by using extensive modularization and the vertical installation of equipment and modules into the reactor building, using a VHL (Very Heavy Lift) crane. This strategy allows short schedules to be met with a minimum risk to the project. This paper describes the latest construction methods used successfully on the Qinshan CANDU 6 project and looks at the extensive implementation of similar methods for ACR. It is concluded, based on the Qinshan success, that the ACR construction schedule is readily achievable. (author)

  9. RETRIEVAL EQUIPMENT DESCRIPTIONS

    International Nuclear Information System (INIS)

    J. Steinhoff

    1997-01-01

    The objective and the scope of this document are to list and briefly describe the major mobile equipment necessary for waste package (WP) retrieval from the proposed subsurface nuclear waste repository at Yucca Mountain. Primary performance characteristics and some specialized design features of the equipment are explained and summarized in the individual subsections of this document. There are no quality assurance requirements or QA controls in this document. Retrieval under normal conditions is accomplished with the same fleet of equipment as is used for emplacement. Descriptions of equipment used for retrieval under normal conditions is found in Emplacement Equipment Descriptions, DI: BCAF00000-01717-5705-00002 (a document in progress). Equipment used for retrieval under abnormal conditions is addressed in this document and consists of the following: (1) Inclined Plane Hauler; (2) Bottom Lift Transporter; (3) Load Haul Dump (LHD) Loader; (4) Heavy Duty Forklift for Emplacement Drifts; (5) Covered Shuttle Car; (6) Multipurpose Vehicle; and (7) Scaler

  10. Experience from construction and operation of Karachi nuclear power plant

    International Nuclear Information System (INIS)

    Zaidi, S.M.N.

    1977-01-01

    Pakistan's first nuclear power plant (KANUPP) is owned and operated by the Pakistan Atomic Energy Commission (PAEC). It uses a heavy water moderated and cooled natural uranium fuelled reactor. Total installed capacity is 137 MW(e). It was designed, constructed and commissioned by Canadian General Electric Co. Ltd. (CGE) as Prime Contractor. Construction started in mid-1966 and was completed in mid 1970; commissioning started in early 1970 and was completed at the end of 1972. Intensive on-the-job training for 20 engineers and 15 operators was provided by CGE in Canada. Ten engineers also worked in CGE's design offices. With this key group of engineers and technicians PAEC had no difficulty in taking over the plant from CGE after completion. The construction of the plant in a developing country presented special problems to CGE. The relatively small local construction firms had limited experience and equipment. Construction plant, equipment and tools were scarce. Fabrication and workshop facilities of limited scope were available but their quotations were relatively high. A scarcity of engineering, technical and skilled manpower for the construction of the project left as the only alternative on-site training for carefully recruited technicians. The results were most gratifying and compared favourably with CGE's Canadian experience. Welding, pipe fitting, tubing work and electrical connections were excellent. The local staff's productivity and dedication were very good. In the commissioning period, PAEC and CGE engineers and technicians worked as one team, testing and debugging the equipment and systems and demonstrating the contractual performance warranties. This period extended to approximately three years due to many technical problems resulting from equipment failures, environmental problems, system problems, plant loading limitations in view of the relatively small size of the grid system and special requirement of fuel conditioning to avoid premature fuel

  11. Budget estimates: Fiscal year 1994. Volume 2: Construction of facilities

    Science.gov (United States)

    1994-01-01

    The Construction of Facilities (CoF) appropriation provides contractual services for the repair, rehabilitation, and modification of existing facilities; the construction of new facilities and the acquisition of related collateral equipment; the acquisition or condemnation of real property; environmental compliance and restoration activities; the design of facilities projects; and advanced planning related to future facilities needs. Fiscal year 1994 budget estimates are broken down according to facility location of project and by purpose.

  12. Construction of a long-distance, sharply curved underground sewerage system by the pit/drift continuous shielding method. Construction of the Arakawa trunk line by the Tokyo Metropolitan Government; Juo renzoku shield koho ni yoru chokyori kyukyokusen seko. Tokyoto gesuidokyoku Arakawa kansen koji

    Energy Technology Data Exchange (ETDEWEB)

    Nagashima, Y.; Okai, F.; Akasaka, J.

    1998-06-25

    The problems encountered in construction of sewarage systems in urban areas are reduced pitting sites, and construction of deeper, longer-distance and more sharply curved systems, resulting from overpopulation both on and under the ground. The Arakawa trunk line, constructed by the Tokyo Metropolitan Government, is to connect the existing Mikawashima sewage plant to Higashioku Sewage Purification Center now under construction, 2400m in total length, 40m as pit depth and 15m in the minimum curvature R, and needs shielding works for segment external forms of 4700mm. The construction method employed is the pit/drift continuous shielding method, which allows continuous works from a pit to drift by a single shielding machine. The machine is equipped with a spherical body holding a drift shielding machine built in a pit shielding machine, to excavate a pit to a given depth, and then a drift after turning the spherical body by 90deg. Each pit is equipped with a lift and each drift with an adequate system to move the segments. Bag-equipped segments are used for sharp curves. The pit/drift shielding method has been already applied to 5 cases, including the Arakawa trunk line construction, centered by those for sewarage systems. 1 ref., 6 figs.

  13. Data communication equipment

    International Nuclear Information System (INIS)

    Kim, Hak Seon; Lee, Sang Mok

    1998-02-01

    The contents of this book are introduction of data communication on definition, purpose and history, information terminal about data communication system and data transmission system, data transmit equipment of summary, transmission cable, data port, concentrator and front-end processor, audio communication equipment like phones, radio communication equipment of summary on foundation of electromagnetic waves, AM transmitter, AM receiver, FM receiver and FM transmitter, a satellite and mobile communication equipment such as earth station, TT and C and Cellular phone, video telephone and new media apparatus.

  14. Medical equipment management

    CERN Document Server

    Willson, Keith; Tabakov, Slavik

    2013-01-01

    Know What to Expect When Managing Medical Equipment and Healthcare Technology in Your Organization As medical technology in clinical care becomes more complex, clinical professionals and support staff must know how to keep patients safe and equipment working in the clinical environment. Accessible to all healthcare professionals and managers, Medical Equipment Management presents an integrated approach to managing medical equipment in healthcare organizations. The book explains the underlying principles and requirements and raises awareness of what needs to be done and what questions to ask. I

  15. Experimental study on joint construction method for aseismatic walls of reactor buildings, (1)

    International Nuclear Information System (INIS)

    Sugita, Kazunao; Mogami, Tatsuo; Ezaki, Tetsuro

    1987-01-01

    On the aseismatic walls of a reactor auxiliary building, many temporary openings are provided at the time of the construction for carrying equipment in later, due to the demand of shortening the construction period. Thus on the aseismatic walls, in most cases there are the joints due to the concrete placed later. As equipment tends to be unitized and become large, the quipment is placed close to the wall having an opening, consequently, the workability is poor, and the standardization of construction method is urgently demanded. The conventional method of closing temporary openings has the problems of safety and connecting reinforcing bars, therefore, the new construction method was proposed. In reactor buildings, the joints of walls are unavoidable, and since those are large scale structures, the joints are numerous. Therefore, at the joint parts, it abandoned and buried frames are used, it is advantageous in the time and cost of joint construction. In both cases, the mechanical properties were confirmed by the fundamental performance test partially modeling the joints and the verifying test modeling the whole walls. In this paper, the test of applying only shearing force to joint models is reported. (Kako, I.)

  16. Use of ice storage equipment in the food industry

    Energy Technology Data Exchange (ETDEWEB)

    Vries, H. de

    1984-01-01

    The manufacture of foods in its widest sense demands a 'balanced supply of cooling'. Whenever 'cold requirement' occurs in different ways during production, the ice storage equipment in particular for 'cooling supplies'. The cooling performance (amount of cold from horizontal tubes and slabs or from horizontal pipes given off to the water flowing past) that can be expected from modern ice storage equipment, is made clear numerically. The way the storage vessel is constructed and its design have particular influence on the energy-saving quality (stirring mechanism with high performance at low pump capacity). Optimisation results for a plate evaporator design combined with a heat exchange system are presented. These include running cost savings of up to 18% in a yoghurt factory, a maltery and an ice cream factory. By means of this heat pump compound, environmental energy can be used in cold storage.

  17. Outline of sodium-water reaction test in case of large leak with SWAT-3 testing equipments

    International Nuclear Information System (INIS)

    Sato, Minoru

    1978-01-01

    The key component in sodium-cooled fast reactors in steam generators, and the sodium-water reaction owing to the break of heating tubes may cause serious damages in equipments and pipings. The main factor controlling this phenomenon is the rate of leak of water. When the rate of water leak is small, the propagation of heating tube breaking may occur owing to ''wastage phenomenon'', on the other hand, when the rate of water leak is large, the phenomena of explosive pressure and flow occur due to the reaction heat and a large quantity of hydrogen generated by the reaction. In PNC, the testing equipments of SWAT-2 for small water leak and SWAT-1 for large leak were constructed, and the development test has been carried out to establish the method of safety design experimentally. The synthetic test equipment for the safety of steam generators, SWAT-3, was constructed to carry out the large water leak test in the scale close to actual plants. The object of the test, the outline of the test equipment, the phenomena of pressure and flow in the water injection test, the confirmation of the occurrence of secondary breaking of adjacent heating tubes, and the disposal of reaction products are described in this paper. This test is till going on, and the final conclusion will be reported later. (Kako, I.)

  18. Preliminary analysis of West Valley Waste Removal System equipment development and mock demonstration facilities

    International Nuclear Information System (INIS)

    Janicek, G.P.

    1981-06-01

    This report defines seven areas requiring further investigation to develop and demonstrate a safe and viable West Valley Waste Removal System. These areas of endeavor are discussed in terms of their minimum facility requirements. It is concluded that utilizing separated specific facilities at different points in time is of a greater advantage than an exact duplication of the West Valley tanks. Savannah River Plant's full-scale, full-circle and half-circle tanks, and their twelfth scale model tank would all be useful to varying degrees but would require modifications. Hanford's proposed full-size mock tank would be useful, but is not seriously considered because its construction may not coincide with West Valley needs. Costs of modifying existing facilities and/or constructing new facilities are assessed in terms of their benefit to the equipment development and mock demonstration. Six facilities were identified for further analysis which would benefit development of waste removal equipment

  19. Shields calculations for teletherapy equipment. Regulatory approach of the National Center of Nuclear Safety

    International Nuclear Information System (INIS)

    Fuente P, A. de la; Dumenigo G, C.; Quevedo G, J.R.; Lopez F, Y.

    2006-01-01

    The evaluation of applications of construction licenses for the new services of radiotherapy has occupied a significant space in the activity developed by the National Center of Nuclear Safety (CNSN) in the last 2 years. Presently work the experiences of the authors in the evaluation of the required shield for the local where cobalt therapy equipment and lineal accelerators of medical use are used its are exposed, the practical problems detected are approached during the application of the methodologies recommended in both cases and its are discussed which have been the suppositions of items accepted by the Regulatory Authority for the realization of these shield calculations. The accumulated experience allows to assure that the realistic application of the item data and the rational use of the engineering logic makes possible to design local for radiotherapy equipment that fulfill the established dose restrictions in the in use legislation in Cuba, without it implies an excessive expense of construction materials. (Author)

  20. Setting-up a small observatory from concept to construction

    CERN Document Server

    Arditti, David

    2008-01-01

    Every amateur astronomer who is considering a purpose-built observatory will find this book absolutely invaluable during both the planning and the construction stages. Drawing on David Arditti’s practical experience and that of many other amateur astronomers, it gives invaluable help in making all the important decisions. To begin with, Setting up a Small Observatory addresses what you really need from an observatory, whether to build or buy, what designs you should consider, and where you should site it. Uniquely, it also considers the aesthetics of an amateur observatory: how to make it fit in with your home, garden, and yard, even disguising it as a more common garden building if necessary. There’s also a wealth of practical details for constructing and equipping your small observatory – everything from satisfying local planning laws and building codes through to making sure that your completed observatory is well-equipped, convenient, and comfortable to use. Whether you are considering a simple low-...

  1. Design, Construction and Evaluation of a Dry Solar Sterilizer

    International Nuclear Information System (INIS)

    Hernández Fereira, Arcelio A.

    2017-01-01

    The objective of the work was the search of an alternative for sterilization using solar energy. For such purposes, a dry solar sterilizer of 4276 cm3 capacity was designed, constructed and evaluated. Potential users would be rural medical posts in areas without electricity, health posts in military units under field conditions, and experimental microbiology stations. The evaluation included the determination of the energy efficiency of the sterilizer, the economic evaluation against other variants and the biological safety assessment. The developed equipment reached the sterilization temperature for levels of the direct component of the solar radiation higher than 300 W/m2 in 14 minutes, corresponding to an average heating rate of 13 0C/minute, higher than that of an electric furnace. Its energy efficiency with direct solar radiation of 310.5 W/m2 was 53.79%. The equipment is of easy construction, simple operation and very low cost. (author)

  2. Operational planning optimization of steam power plants considering equipment failure in petrochemical complex

    International Nuclear Information System (INIS)

    Luo, Xianglong; Zhang, Bingjian; Chen, Ying; Mo, Songping

    2013-01-01

    Highlights: ► We develop a systematic programming methodology to address equipment failure. ► We classify different operation conditions into real periods and virtual periods. ► The formulated MILP models guarantee cost reduction and enough operation safety. ► The consideration of reserving operation redundancy is effective. - Abstract: One or more interconnected steam power plants (SPPs) are constructed in a petrochemical complex to supply utility energy to the process. To avoid large economic penalties or process shutdowns, these SPPs should be flexible and reliable enough to meet the process energy requirement under varying conditions. Unexpected utility equipment failure is inevitable and difficult to be predicted. Most of the conventional methods are based on the assumption that SPPs do not experience any kind of equipment failure. Unfortunately, a process shutdown cannot be avoided when equipment fails unexpectedly. In this paper, a systematic methodology is presented to minimize the total cost under normal conditions while reserving enough flexibility and safety for unexpected equipment failure conditions. The proposed method transforms the different conditions into real periods to indicate normal scenarios and virtual periods to indicate unexpected equipment failure scenarios. The optimization strategy incorporating various operation redundancy scheduling, the transition constraints from equipment failure conditions to normal conditions, and the boiler load increase behavior modeling are presented to save cost and guarantee operation safety. A detailed industrial case study shows that the proposed systematic methodology is effective and practical in coping with equipment failure conditions with only few additional cost penalties

  3. Behavior of Equipment Support Beam Joint Directly Connected to A Steel-plate Concrete(SC) Wall

    International Nuclear Information System (INIS)

    Kim, K. S.; Kwon, K. J.

    2008-01-01

    To decrease the time for building nuclear power plants, a modular construction method, 'Steel-plate Concrete(SC)', has been investigated for over a decade. To construct a SC wall, a pair of steel plates are placed in parallel similar to a form-work in conventional reinforced concrete (RC) structures, and concrete is filled between the steel plates. Instead of removing the steel plates after the concrete has cured, the steel plates serve as components of the structural member. The exposed steel plate of SC structures serves as the base plate for the equipment support, and the headed studs welded to the steel plates are used as anchor bolts. Then, a support beam can be directly welded to the surface of the steel plate in any preferred position. In this study, we discuss the behavior and evaluation method of the equipment support joint directly connected to exposed steel plate of SC wall

  4. Renewal of radiological equipment.

    Science.gov (United States)

    2014-10-01

    In this century, medical imaging is at the heart of medical practice. Besides providing fast and accurate diagnosis, advances in radiology equipment offer new and previously non-existing options for treatment guidance with quite low morbidity, resulting in the improvement of health outcomes and quality of life for the patients. Although rapid technological development created new medical imaging modalities and methods, the same progress speed resulted in accelerated technical and functional obsolescence of the same medical imaging equipment, consequently creating a need for renewal. Older equipment has a high risk of failures and breakdowns, which might cause delays in diagnosis and treatment of the patient, and safety problems both for the patient and the medical staff. The European Society of Radiology is promoting the use of up-to-date equipment, especially in the context of the EuroSafe Imaging Campaign, as the use of up-to-date equipment will improve quality and safety in medical imaging. Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or renewal. This plan should look forward a minimum of 5 years, with annual updates. Teaching points • Radiological equipment has a definite life cycle span, resulting in unavoidable breakdown and decrease or loss of image quality which renders equipment useless after a certain time period.• Equipment older than 10 years is no longer state-of-the art equipment and replacement is essential. Operating costs of older equipment will be high when compared with new equipment, and sometimes maintenance will be impossible if no spare parts are available.• Older equipment has a high risk of failure and breakdown, causing delays in diagnosis and treatment of the patient and safety problems both for the patient and the medical staff.• Every healthcare institution or authority should have a plan for medical imaging equipment upgrade or replacement. This plan should look forward a

  5. Horizon Dam design, construction, and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.

  6. RCC-F: Design and construction rules for PWR fire protection systems

    International Nuclear Information System (INIS)

    2013-01-01

    The RCC-F code defines the rules for designing, building and installing the fire protection systems used to manage the nuclear hazards inherent in the outbreak of a fire inside the facility and thereby control the fundamental nuclear functions. The code provides fire protection recommendations in terms of: the industrial risk (loss of assets and/or operation), personnel safety, the environment. The code is divided into five main sections: generalities, design safety principles, fire protection design bases, construction provisions, rules for installing the fire protection components and equipment. The RCC-F code is available as an ETC-F version specifically for EPR projects (European pressurized reactor). Contents of the 2013 edition of the ETC-F code: Volume A - Generalities: Structure of ETC-F general points, documentation (in progress), chapter (provision) quality assurance; Volume B - Design safety principles: design nuclear safety principles; Volume C - Fire protection design bases: fire protection design bases; Volume D - Construction provisions: construction provisions; Volume E - Installation rules for fire protection: rules for installing the fire protection, components and equipment

  7. Optimizing the construction of devices to control inaccesible surfaces - case study

    Science.gov (United States)

    Niţu, E. L.; Costea, A.; Iordache, M. D.; Rizea, A. D.; Babă, Al

    2017-10-01

    The modern concept for the evolution of manufacturing systems requires multi-criteria optimization of technological processes and equipments, prioritizing associated criteria according to their importance. Technological preparation of the manufacturing can be developed, depending on the volume of production, to the limit of favourable economical effects related to the recovery of the costs for the design and execution of the technological equipment. Devices, as subsystems of the technological system, in the general context of modernization and diversification of machines, tools, semi-finished products and drives, are made in a multitude of constructive variants, which in many cases do not allow their identification, study and improvement. This paper presents a case study in which the multi-criteria analysis of some structures, based on a general optimization method, of novelty character, is used in order to determine the optimal construction variant of a control device. The rational construction of the control device confirms that the optimization method and the proposed calculation methods are correct and determine a different system configuration, new features and functions, and a specific method of working to control inaccessible surfaces.

  8. Gas phase decontamination of gaseous diffusion process equipment

    International Nuclear Information System (INIS)

    Bundy, R.D.; Munday, E.B.; Simmons, D.W.; Neiswander, D.W.

    1994-01-01

    D ampersand D of the process facilities at the gaseous diffusion plants (GDPs) will be an enormous task. The EBASCO estimate places the cost of D ampersand D of the GDP at the K-25 Site at approximately $7.5 billion. Of this sum, nearly $4 billion is associated with the construction and operation of decontamination facilities and the dismantlement and transport of contaminated process equipment to these facilities. In situ long-term low-temperature (LTLT) gas phase decontamination is being developed and demonstrated at the K-25 site as a technology that has the potential to substantially lower these costs while reducing criticality and safeguards concerns and worker exposure to hazardous and radioactive materials. The objective of gas phase decontamination is to employ a gaseous reagent to fluorinate nonvolatile uranium deposits to form volatile LJF6, which can be recovered by chemical trapping or freezing. The LTLT process permits the decontamination of the inside of gas-tight GDP process equipment at room temperature by substituting a long exposure to subatmospheric C1F for higher reaction rates at higher temperatures. This paper outlines the concept for applying LTLT gas phase decontamination, reports encouraging laboratory experiments, and presents the status of the design of a prototype mobile system. Plans for demonstrating the LTLT process on full-size gaseous diffusion equipment are also outlined briefly

  9. In situ measurement of dynamic characteristics of atomic power plant equipment

    International Nuclear Information System (INIS)

    Arya, A.S.; Gupta, S.P.; Shrivastava, S.K.

    1977-01-01

    For the realistic assessment of stiffness and damping, full scale free vibration tests have been carried out on various pieces of equipment located in plant buildings both during the construction stage and after they are erected. Initial displacement or initial velocity was used to excite the free vibrations. Initial displacement was imparted by means of steel rope pulled with chain pulley block. The sudden release was achieved by means of a clutch system. Acceleration transducer with amplifier and ink writting oscillograph was used for recording the vibrations. Frequency and damping was evaluated from the acceleration records. Observed values for some equipment are given. For some equipment, it has been possible to obtain the values with and without pipe connections. The frequency of L.P. Heater in longitudinal and transverse directions without pipe connection were 17.86 and 10.04 Hz but with pipe connections the values increased to 26.74 and 17.85 Hz. Similarly there has been increase in the damping values too. Thus both the frequency and damping increases substantially with the addition of pipe connections. Moreover, their values are quite different in the two principal directions, pointing out to the importance of in situ measurements on prototype equipment

  10. Presentation of the RCC-M design and construction rule

    International Nuclear Information System (INIS)

    Quero, J.R.

    1983-03-01

    Presentation of the French rules for design and construction of nuclear power plant components: stress resistance, material choice, fabrication and quality control, control methodology etc... covering equipments such as pressurized components (tanks, exchangers, pipes, pumps, valves and fittings), internal and support reactor elements and non pressurized small devices [fr

  11. Repository Planning, Design, and Engineering: Part II-Equipment and Costing.

    Science.gov (United States)

    Baird, Phillip M; Gunter, Elaine W

    2016-08-01

    Part II of this article discusses and provides guidance on the equipment and systems necessary to operate a repository. The various types of storage equipment and monitoring and support systems are presented in detail. While the material focuses on the large repository, the requirements for a small-scale startup are also presented. Cost estimates and a cost model for establishing a repository are presented. The cost model presents an expected range of acquisition costs for the large capital items in developing a repository. A range of 5,000-7,000 ft(2) constructed has been assumed, with 50 frozen storage units, to reflect a successful operation with growth potential. No design or engineering costs, permit or regulatory costs, or smaller items such as the computers, software, furniture, phones, and barcode readers required for operations have been included.

  12. Modification of a recuperator construction with CFD methods

    Directory of Open Access Journals (Sweden)

    Ludwig Wojciech

    2017-12-01

    Full Text Available The purpose of the work was initial modification of the construction of a commercially produced heat exchanger – recuperator with CFD (computational fluid dynamics methods, based on designs and process parameters which were provided. Uniformity of gas distribution in the space between the tubes of the apparatus as well as the pressure drop in it were taken as modification criteria. Uniformity of the gas velocity field between the tubes of the heat exchanger should cause equalization of the local individual heat transfer coefficient values and temperature value. Changes of the apparatus construction which do not worsen work conditions of the equipment, but cause savings of constructional materials (elimination or shortening some parts of the apparatus were taken into consideration.

  13. Management of the interfaces between construction and startup

    International Nuclear Information System (INIS)

    Anderson, W.R.; Beatty, D.C.

    1976-01-01

    Many papers have been presented, and many articles published on the various tasks of Nuclear Plant Design, Construction, Startup and Operations. Most of the presentations have been concerned with the complexities of the particular task being discussed. This is as it should be, since these areas are quite broad in themselves and deserve the full attention of the technology. Recently more attention is being directed to the interfaces between the classical portions of nuclear projects. The paper attempts to address just one of these areas: the interfaces between construction and startup. These interfaces have normally been addressed to the extent that engineering schedules, construction schedules, equipment deliveries and startup test schedules have been dovetailed graphically, or computerized, and periodically updated to reflect significant changes

  14. Economic assessment of the construction industry: A construction-economics nexus

    Science.gov (United States)

    Barber, Herbert Marion, Jr.

    The purpose of this study was to conduct an economic assessment of the construction industry. More specifically, this study addresses ambiguities within the literature that are associated with the construction-economics nexus. The researcher 1) investigated the relationships between economic indicators and stock prices of U.S. construction equipment manufacturers, 2) investigated the relationships between energy production, consumption, and corruption, and 3) determined the economic effect electricity generation and electricity consumption has on economies of scale. The researcher used descriptive and inferential statistics in this study and determined that economists, researchers, policy-makers, and others should have predicted the 2007-08 world economic collapse 5-6 years prior to realization of the event given that construction indices and GDP grossly regressed from statistically acceptable trends as early as 2002 and perhaps 2000. Substantiating this claim, the effect of the cost of construction materials and labor, i.e. construction index, on GDP was significant for years leading up to the collapse (1970-2007). Additionally, it was determined that energy production and consumption are predictors of governmental corruption in some countries. In the Republic of Botswana, for example, the researcher determined that energy production and consumption statistically jointly effected governmental corruption. In addition to determining statistical effect, a model for predicting governmental corruption was developed based on energy production and consumption volumes. Also, the researcher found that electricity generation in the 25 largest world economies had a statistically significant effect on GDP. Electricity consumption also had an effect on GDP, as well, but not on other economic indicators. More importantly than the quantitative findings, the researcher concluded that the construction-economics nexus is far more complex than most policy-makers realize. As such

  15. Construction of helium engineering demonstration loop (HENDEL M+A) for VHTR

    International Nuclear Information System (INIS)

    Shimomura, Saneaki; Tanaka, Toshiyuki; Nakano, Tadasuke

    1983-01-01

    The mother and adapter sections of the large structural component demonstration test loop, alias Helium Engineering Demonstration Loop, for the multipurpose, high temperature gas-cooled experimental reactor were completed in March, 1982. This facility was constructed by Fuji Electric Co., Ltd. and Kawasaki Heavy Industries Ltd. as the main contractors, and by the cooperation with Mitsubishi Heavy Industries Ltd. and Ishikawajima Harima Heavy Industries Co., Ltd. The HENDEL M+A is the testing facility of the largest scale in the world, which can handle 1000 deg C, 40 kgf/cm 2 G helium at a half flow rate of one core cooling loop of the experimental reactor. With the HENDEL M+A, the demonstration tests of fuel assembly stacks, in-core structures, large flow rate and high temperature equipment are planned. The HENDEL M+A comprises two mother loops, an adapter loop, and common auxiliary systems fon measurement and control (In), refining (Mp), makeup (Mu) and cooling water (Uc). The construction and function of such main equipment as a heater, circulators and internally insulated piping are described. The progress of the construction and the main experience during the construction, the process of operation and the performance are reported. (Kako, I.)

  16. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  17. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  18. Special equipment for processing can-rupture measurements; Equipement specialise de traitement des mesures de rupture de gaines

    Energy Technology Data Exchange (ETDEWEB)

    Kaiser, J.; Phalippou, J.; Dumont, D.; Viellard, R. [Commissariat a l' Energie Atomique, Saclay (France). Centre d' Etudes Nucleaires

    1969-07-01

    Recent installations for detecting can-rupture in nuclear reactors use, in the measurement processing section, a digital computer, either completely or partially. The reliability of the system is limited by that of the computer, which represents a common point for the processing of data from the detector. In order to satisfy the demands imposed by safety considerations for the operation of the equipment it is necessary to consider the possibility of installing a second computer in certain cases. The use of a computer involves the presence as interface between the detection equipment and the computer itself, of sealers operating as integrators for the pulses produced by the detector. By adding a certain number of circuits to these sealers, it is possible to carry out the work now demanded of the computer, as far as the calculation is concerned. This reasoning has led us to a so-called 'decentralized' solution involving the construction of specialized equipment in the region of the prospector itself. We believe that this solution, apart from the reliability point of view, has definite economic advantages. In our solution, the common point in the processing of the data is now situated not in the zone of the production of results but further down, in the printing out of these results. Even in the case of an incident at the common point, the results are produced, exposed and compared to the alarm thresholds. In the case of a breakdown of the specialized equipment, the results from this prospector are no longer available but the others continue to operate. It seems that this solution is more reliable than that employing universal computers. By using an interchangeable drawer system (MULTIBLOC) it is possible to replace rapidly any of the specialized equipment which breaks down. The systematic use of integrated circuits (TTL) ensures an increased reliability of the equipment. (author) [French] Les installations recentes de detection de rupture de gaines

  19. Report on further development of the Winfrith Modular Containment System and associated equipment

    International Nuclear Information System (INIS)

    Sanders, M.J.; Pengelly, M.G.A.

    1988-03-01

    As a result of operational experience gained with the Winfrith Modular Containment, the need for a lifting aid to facilitate the decommissioning of tall plant, a 2-stage mobile ventilation system and an improved shower entry tunnel was identified. Improved plant and equipment has been designed, constructed and tested and the results are presented here. (author)

  20. Design and construction of the SAPHIR detector

    International Nuclear Information System (INIS)

    Schwille, W.J.; Bockhorst, M.; Burbach, G.; Burgwinkel, R.; Empt, J.; Guse, B.; Haas, K.M.; Hannappel, J.; Heinloth, K.; Hey, T.; Honscheid, K.; Jahnen, T.; Jakob, H.P.; Joepen, N.; Juengst, H.; Kirch, U.; Klein, F.J.; Kostrewa, D.; Lindemann, L.; Link, J.; Manns, J.; Menze, D.; Merkel, H.; Merkel, R.; Neuerburg, W.; Paul, E.; Ploetzke, R.; Schenk, U.; Schmidt, S.; Scholmann, J.; Schuetz, P.; Schultz-Coulon, H.C.; Schweitzer, M.; Tran, M.Q.; Vogl, W.; Wedemeyer, R.; Wehnes, F.; Wisskirchen, J.; Wolf, A.

    1994-01-01

    The design, construction, and performance of the large solid angle magnetic spectrometer SAPHIR is described. It was built for the investigation of photon-induced reactions on nucleous and light nuclei with mulit-particle final states up to photon energies of 3.1 GeV. The detector is equipped with a tagged photon beam facility and is operated at the stretcher ring ELSA in Bonn. (orig.)

  1. Design and construction of the SAPHIR detector

    Energy Technology Data Exchange (ETDEWEB)

    Schwille, W.J. (Bonn Univ. (Germany). Physikalisches Inst.); Bockhorst, M. (Bonn Univ. (Germany). Physikalisches Inst.); Burbach, G. (Bonn Univ. (Germany). Physikalisches Inst.); Burgwinkel, R. (Bonn Univ. (Germany). Physikalisches Inst.); Empt, J. (Bonn Univ. (Germany). Physikalisches Inst.); Guse, B. (Bonn Univ. (Germany). Physikalisches Inst.); Haas, K.M. (Bonn Univ. (Germany). Physikalisches Inst.); Hannappel, J. (Bonn Univ. (Germany). Physikalisches Inst.); Heinloth, K. (Bonn Univ. (Germany). Physikalisches Inst.); Hey, T. (Bonn Univ. (Germany). Physikalisches Inst.); Honscheid, K. (Bonn Univ. (Germany). Physikalisches Inst.); Jahnen, T. (Bonn Univ. (Germany). Physikalisches Inst.); Jakob, H.P. (Bonn Univ. (Germany). Physikalisches Inst.); Joepen, N. (Bonn Univ. (Germany). Physikalisches Inst.); Juengst, H. (Bonn Univ. (Germany). Physikalisches Inst.); Kirch, U. (Bonn Univ. (Germany). Physikalisches Inst.); Klein, F.J. (Bonn Univ. (Germany). Physikalisches Inst.)

    1994-05-15

    The design, construction, and performance of the large solid angle magnetic spectrometer SAPHIR is described. It was built for the investigation of photon-induced reactions on nucleous and light nuclei with mulit-particle final states up to photon energies of 3.1 GeV. The detector is equipped with a tagged photon beam facility and is operated at the stretcher ring ELSA in Bonn. (orig.)

  2. DEVELOPMENT OF COMPLEX EQUIPMENT FOR PLASMA SPRAY CERAMIC COATINGS

    Directory of Open Access Journals (Sweden)

    V. V. Okovity

    2017-01-01

    Full Text Available Develop a set equipment for plasma forming ceramic coatings. The article presents characteristics and parameters of the developed complex equipment for formation of plasma ceramic coatings as well as results of its testing. Methods of research is based on studies of structural elements composite plasma coatings system ZrO2 – Y2O3  obtained  using  developed complex equipment. One of the most effective ways to protect the components from high temperature corrosion and oxidation is formation on the surface of plasma thermal barrier coatings. For thermal barrier coating has very strict requirements: сharacterized by a smooth change of physico-mechanical properties (porosity, microhardness, elastic modulus in the cross section of the metal substrate to the outer ceramic layer; to withstand multiple cycles of thermal cycling from room temperature to the operating temperature; to maintain gastightness under operating conditions and thus ensure a sufficiently high level of adhesive strength. For realization of new technological schemes applying thermal barrier coatings with high operational characteristics was developed, patented and manufactured a range of new equipment. The experiments show that authors developed PBG-1 plasmatron and powder feeder PPBG-04 have at least 2–3 times the service life during the deposition of ceramic materials compared to the standard equipment of the company "Plasma-Technik", by changing the structure of the cathode-anode plasma torch assembly and construction of the delivery unit of the feeder to facilitate the uniform supply of the powder into the plasma jet and the best of his penetration. The result is better plasma coatings with improved operational characteristics: adhesion strength is increased to 1.3–2 times, material utilization in 1.5–1.6 times microhardness 1.2–1.4 times the porosity is reduced by 2–2.5 times.

  3. A simulation tool for radio frequency identification construction supply chains

    NARCIS (Netherlands)

    Gassel, van F.J.M.; Jansen, G.; Zavadskas, E.K.; Kaklauskas, A.; Skibniewski, M.J.

    2008-01-01

    Radio Frequency IDentification (RFID) technology is being used more and more in the construction industry. RFID tags and peripheral equipment are becoming cheaper and more suitable for application in the supply chain. However, it is difficult for contractors to estimate the costs and benefits of

  4. Qualification and training of personnel for nuclear equipment programmes

    International Nuclear Information System (INIS)

    Montagnier, S.

    1980-01-01

    The Equipment Department of Electricite de France has the task of designing, co-ordinating the construction of and commissioning the power stations required to feed the grid as part of the country's energy policity. The French nuclear programme may seem ambitious - 35.000 to 40.000 MW in service by 1985 - but it should be remembered that the first nuclear power plant construction in France goes back more than 20 years and that, as a result of this, the Equipment Department already has qualified staff at its disposal. Hence the proposed training activities take into account the educational background of such personnel and the number of persons concerned. These activities can be divided into (1) the professional orientation phase, intended for recently recruited staff members and consisting of discussion and instruction seminars aimed at facilitating the induction of the young recruit into EDF's departments, and (2) the training and retraining phase, intended for all staff in accordance with each person's particular job and made up, as the case may be, of courses in new theoretical knowledge, updating of previous knowledge, often accompanied by extensive practical work in the field, discussion of working methods, study of new operational techniques, and so forth. The teaching methods adopted naturally take into account the professional level of the trainees and are therefore usually 'active' or 'semi-active', entailing groups of the order of 12 persons, with effective participation by their supervisors. (author)

  5. THE GRAPHICAL MODELING, SIMULATION AND REALIZATION OF AN EQUIPMENT WITH OPTO-REFLECTIVE SENSORS FOR THE MANAGEMENT OF URBAN PUBLIC TRANSPORT PASSENGERS

    Directory of Open Access Journals (Sweden)

    CRIȘAN Horea George

    2015-06-01

    Full Text Available The development of an equipment capable to carry out a real-time evaluation above loading of urban buses, allows the optimization of the urban transport vehicles distribution on a network segment, reducing waiting times, the passenger crowds in buses and at the same time decreasing the need of buses maintenance, issues with direct effects on the growth of the carriers economic profit. A solution based on optical detection is one that can generate results with high accuracy in relatively low cost conditions. This advantage can be obtained only if the constructive version of the equipment is properly designed, taking into account the geometric parameters of the light slots emitted and received by the sensors. Therefore, using three-dimensional CAD modelling, it was realized an optimal constructive variant. This graphical method also allows it the viewing, variation and synchronization of sensors geometrical parameters, so in this way, the equipment can produce the desired effect. Further, it has been carried out a graphical simulation of the designed equipment function, in order to validate the obtained results. Later, the designed equipment was achieved and tested under laboratory conditions, in order to be implemented and used under real conditions, on the buses of an urban public transport operator.

  6. Developing ''SMART'' equipment and systems through collaborative NERI research and development

    International Nuclear Information System (INIS)

    Harmon, Daryl L.; Chapman, Leon D.; Golay, Michael W.; Maynard, Kenneth P.; SpencerR, Joseph W.

    2000-01-01

    The United States Department of Energy initiated the Nuclear Energy Research Initiative (NERI) to conduct research and development with the objectives of: (1) overcoming the principal technical obstacles to expanded nuclear energy use, (2) advancing the state of nuclear technology to maintain its competitive position in domestic and world markets, and (3) improving the performance, efficiency, reliability, and economics of nuclear energy. Fiscal Year 1999 program funding is $19 Million, with increased finding expected for subsequent years, emphasizing international cooperation. Among the programs selected for funding is the ''Smart Equipment and Systems to Improve Reliability and Safety in Future Nuclear Power Plant Operations''. This program is a 30 month collaborative effort bringing together the technical capabilities of ABB C-E Nuclear Power, Inc. (ABB CENP), Sandia National Laboratories, Duke Engineering and Services (DE and S), Massachusetts Institute of Technology (MIT) and Pennsylvania State University (PSU). The program's goal is to design, develop and evaluate an integrated set of smart equipment and predictive maintenance tools and methodologies that will significantly reduce nuclear plant construction, operation and maintenance costs. To accomplish this goal the Smart Equipment program will: (1) Identify and prioritize nuclear plant equipment that would most likely benefit from adding smart features; (2) Develop a methodology for systematically monitoring the health of individual pieces of equipment implemented with smart features (i.e. smart equipment); (3) Develop a methodology to provide plant operators with real-time information through smart equipment Man-Machine Interfaces (MMI) to support their decision making; (4) Demonstrate the methodology on a targeted component and/or system; (5) Expand the concept to system and plant levels that allow communication and integration of data among smart equipment. This paper will discuss (1) detailed subtask

  7. Concreting organization during Chernobylsk NPP construction

    International Nuclear Information System (INIS)

    Lysyuk, R.I.; Kareva, A.P.

    1984-01-01

    Conreting organization during the Chernobylsk NPP construction is described. Processes of extra heavy concrete production and placement, which specific mass constitutes 4t/m 3 at the age of 28 days wiath metallic aggregates and 3.3-3.5 t/m 3 at the same age without aggregates, are considered in short. Basic characteristics of this concrete are presented. At the 4th power unit labour contents for construction works were a 1.5 times lower as compared to the 3rd power unit erection. This progress was achieved by round-the-clock operation of the concrete plant with the 800 m 3 /day output and also by utilization of special equipment for mechanized concrete placement: concrete pumps, automatic concrete mixer, manipulators and concrete pipelines

  8. Safety code 19: recommended safety procedures for the selection, installation and use of x-ray diffraction equipment

    International Nuclear Information System (INIS)

    1984-01-01

    This document is one of a series of Safety Codes prepared by the Radiation Protection Bureau to set out requirements for the safe use of radiation emitting devices. The equipment and installation guidelines and safety procedures detailed in this Code are primarily for the instruction and guidance of persons employed in Federal Public Service Departments and Agencies, as well as those coming under the jurisdiction of the Canada Labour Code. This Safety Code is also intended to assist other users of X-ray diffraction equipment to select safe equipment and to install and use it so that the radiation hazard to the operator and other persons in its vicinity is negligible. It should be noted that facilities under provincial jurisdiction may be subject to requirements specified under provincial statutes. This Code supersedes Safety Code RPD-SC-7, entitled 'Requirements For Non-Medical X-Ray Equipment, Use and Installation', insofar as X-ray diffraction equipment is concerned, and it is intended to complement X-ray equipment design, construction and performance standards promulgated under the Radiation Emitting Devices Act

  9. Experts and equipment: The IAEA programme in 1965

    International Nuclear Information System (INIS)

    1965-01-01

    Nearly 100 projects are being assisted by Agency experts and equipment in 38 countries under the 1965 programme to be financed from Agency funds, which the Board of Governors approved at its meeting in February, together with four other countries where projects previously approved extend into 1965. In addition, further work is being financed under the UN Expanded Programme of Technical Assistance, including several important regional projects. Under the Agency's long-term programme, it is desirable that all types of technical assistance, whether training, research, or expert advice, should be combined as far as possible. Each country will therefore be asked, in respect of its 1966 programme, to make its requests for experts, equipment, fellowships, scientific visits and research grants as a single submission. The Agency then prepares a country programme of technical assistance, in collaboration with the Government. The number of requests for experts and equipment continues to grow year by year, and it has not been possible to finance them all. This increase is largely because a number of Member States have now set up research reactors and established a nucleus of laboratories under bilateral arrangements; they then turn to the Agency for assistance in developing their programmes. The estimated cost of experts and equipment being provided from Agency resources is $874 000 in 1965, of which $596 800 is for experts, and $277 200 is for equipment and supplies. The Agency also assists some Member States in making arrangements to receive technical assistance directly from other Member States. The work covers a wide range, with isotopes predominating; about 30 projects deal with production of isotopes, their applications in medicine, agriculture and hydrology, in food preservation and industry. A number of projects are concerned with various aspects of reactor construction and use; others deal with health and safety, instrumentation, special branches of chemistry and

  10. 29 CFR 97.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  11. 44 CFR 13.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  12. 24 CFR 85.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  13. 43 CFR 12.72 - Equipment.

    Science.gov (United States)

    2010-10-01

    ...) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be replaced as... equipment (including replacement equipment), whether acquired in whole or in part with grant funds, until... established to ensure the highest possible return. (e) Disposition. When original or replacement equipment...

  14. Construction of Monju

    International Nuclear Information System (INIS)

    Yoshino, Kenichi; Ogiso, Zenichi; Nakamura, Kazuo; Nishida, Masaaki; Tateishi, Yoshinori; Mishima, Tsuyoshi

    1994-01-01

    The construction works was started in January, 1983. The main works can be divided into (1) the construction of the roads to the site including the repair of the prefectural road, (2) the preparation of the land for temporary installation outside the site, (3) the creation of the site, the excavation for building foundations, the change of the stream in the site, and the land side works of water intake and discharge facilities, (4) the sea area works of bank revetment, breakwaters and unloading quay, and (5) the manufacture of caissons and blocks in the Technoport Fukui about 60 km distant from the site. The main buildings are those for the reactor, reactor auxiliaries, maintenance and waste treatment, diesel engines, and the turbine. The aseismatic structure, the coolant temperature if it leaks were the main considerations. The manufacture, transport and installation of machinery and equipment are reported. The sodium of about 1700 t was imported from France. The MOX fuel for initial charge was produced, and the pellets were filled smoothly. (K.I.)

  15. Powder Metallurgy Reconditioning of Food and Processing Equipment Components

    Science.gov (United States)

    Nafikov, M. Z.; Aipov, R. S.; Konnov, A. Yu.

    2017-12-01

    A powder metallurgy method is developed to recondition the worn surfaces of food and processing equipment components. A combined additive is composed to minimize the powder losses in sintering. A technique is constructed to determine the powder consumption as a function of the required metallic coating thickness. A rapid method is developed to determine the porosity of the coating. The proposed technology is used to fabricate a wear-resistant defectless metallic coating with favorable residual stresses, and the adhesive strength of this coating is equal to the strength of the base metal.

  16. A typewriting system operated by head movements, based on home-computer equipment.

    Science.gov (United States)

    Heuvelmans, A M; Mélotte, H E; Neve, J J

    1990-06-01

    For persons who cannot move their hands and legs we have designed a relatively inexpensive typewriting system which can be operated by movements of the head. The typewriter is made up of commercially available home computer equipment - i e, a computer including monitor and printer and a headset replacing the mouse. A user-friendly software program has been designed to replace the mouse button and to make this equipment act as a typewriter with simple text-editing features. Some ergonomics aspects of the typewriter set-up and the results of an evaluation of the typewriter by two patients suffering from amyotrophic lateral sclerosis (ALS) are given. Several factors relevant to the design, construction, evaluation and application of the typewriter are discussed.

  17. Application of a Multivariate Statistical Technique to Interpreting Data from Multichannel Equipment for the Example of the KLEM Spectrometer

    International Nuclear Information System (INIS)

    Podorozhnyi, D.M.; Postnikov, E.B.; Sveshnikova, L.G.; Turundaevsky, A.N.

    2005-01-01

    A multivariate statistical procedure for solving problems of estimating physical parameters on the basis of data from measurements with multichannel equipment is described. Within the multivariate procedure, an algorithm is constructed for estimating the energy of primary cosmic rays and the exponent in their power-law spectrum. They are investigated by using the KLEM spectrometer (NUCLEON project) as a specific example of measuring equipment. The results of computer experiments simulating the operation of the multivariate procedure for this equipment are given, the proposed approach being compared in these experiments with the one-parameter approach presently used in data processing

  18. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  19. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  20. Musical Sound, Instruments, and Equipment

    Science.gov (United States)

    Photinos, Panos

    2017-12-01

    'Musical Sound, Instruments, and Equipment' offers a basic understanding of sound, musical instruments and music equipment, geared towards a general audience and non-science majors. The book begins with an introduction of the fundamental properties of sound waves, and the perception of the characteristics of sound. The relation between intensity and loudness, and the relation between frequency and pitch are discussed. The basics of propagation of sound waves, and the interaction of sound waves with objects and structures of various sizes are introduced. Standing waves, harmonics and resonance are explained in simple terms, using graphics that provide a visual understanding. The development is focused on musical instruments and acoustics. The construction of musical scales and the frequency relations are reviewed and applied in the description of musical instruments. The frequency spectrum of selected instruments is explored using freely available sound analysis software. Sound amplification and sound recording, including analog and digital approaches, are discussed in two separate chapters. The book concludes with a chapter on acoustics, the physical factors that affect the quality of the music experience, and practical ways to improve the acoustics at home or small recording studios. A brief technical section is provided at the end of each chapter, where the interested reader can find the relevant physics and sample calculations. These quantitative sections can be skipped without affecting the comprehension of the basic material. Questions are provided to test the reader's understanding of the material. Answers are given in the appendix.

  1. Quality assurance and supervision of mass concrete construction under EPC mode

    International Nuclear Information System (INIS)

    Peng Hong

    2013-01-01

    Taking one typical general contraction project-Hainan Changjiang nuclear power project as an example, this paper introduces the mass concrete construction of nuclear island foundation of Unit 1 in its installation phase, elaborates how to conduct quality assurance and supervision for concrete production, construction, supervision and management, detects relevant weak points of quality and management in the mass concrete construction through quality assurance supervision, puts forward management requirements for the supervising organizations, accumulates useful experience on how to promote contractors to implement the contract in line with national laws, regulations and to improve the management in equipment installation, commissioning and acceptance. (authors)

  2. IE Information Notice No. 85-08: Industry experience on certain materials used in safety-related equipment

    International Nuclear Information System (INIS)

    Jordan, E.L.

    1992-01-01

    This information notice is being issued to provide licensees and construction permit holders with information pertaining to the behavior of certain materials used in safety-related equipment. The materials, as described below, were observed to have the potential of degrading the operability of safety-related equipment. These observations were made during environmental qualification testing and/or during routine inspection of in-service equipment. The notice describes the following: elastomeric seals used in personnel air locks for the reactor containment systems; epoxy phenolic coating applied to the lower portion of the interior surface of diesel oil storage tanks; the use of Viton elastomer as the seal material in hydrogen recombiner applications; and environmental qualification of ASCO NP valves with Viton and ethylene propylene parts

  3. Structure Analysis of the Graphic Simulator for the PRIDE Equipment

    International Nuclear Information System (INIS)

    Kim, Chang Hoi; Kim, Seong Hyun; Park, Byung Suk; Lee, Jong Kwang; Lee, Hyo Jik; Kim, Ki Ho

    2010-12-01

    Simulation technology based on the computer graphics is able to minimize the trial and error and reduce the development cost and period dramatically at the design stage of the pyroprocessing facility construction and the equipment development. For this purpose, the 3D graphic simulation program named HotCell has been developed. HotCell has continuously updated for the functional addition and the bug fix, and now it reaches version third. The Digital mockup of PRIDE is furnished with the MSM(matster-slave manipulator), BDSM(bridge transported dual arm servo manipulator) and Crane in order to remote handling the processing equipment. HotCell program can be interface with the 3D mouse, the haptic device and the joystick for the realistic operation of above device. The posture of MSM can be recorded with the simple keyboard operation in order to reproduce the behavior of the MSM

  4. Some special problems during the planning and construction of the Paks nuclear power station

    Energy Technology Data Exchange (ETDEWEB)

    Szilagyi, G.; Szalai, G.; Ferenczy, G.; Sarkoezy, E.; Daniel, G. (Eroemue es Halozattervezoe Vallalat, Eroeterv, Budapest (Hungary))

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned.

  5. Radioisotopic methods for quality control of works and studies while constructing foundations and underground structures

    International Nuclear Information System (INIS)

    Smorodinov, M.I.

    1980-01-01

    The data on the use of radioisotope methods of quality control of various kinds of construction works when building foundations and underground constructions and when carrying out scientific research, are presented. Devices and equipment are described, their block diagrams are presented. The experience in using radioisotope devices to control the quality of construction works, is presented. The problems of economic effectivenes of works using radioisotope devices are solved

  6. State of the art and further development of reinforced concrete wall cells for nuclear power plant construction

    International Nuclear Information System (INIS)

    Uhlemann, E.; Wartenberg, J.

    1985-01-01

    Reinforced concrete wall cells have been developed for nuclear power plant construction by the USSR and GDR. In this article, a new type of these cells, which will be used for constructing auxiliary equipment of the Stendal nuclear power plant, is described

  7. A Study on the Analysis of CO2 Emissions of Apartment Housing in the Construction Process

    Directory of Open Access Journals (Sweden)

    Jonggeon Lee

    2018-01-01

    Full Text Available Recent research in the construction industry has focused on the reduction of CO2 emission using quantitative assessment of building life. However, most of this research has focused on the operational stage of a building’s life cycle. Few comprehensive studies of CO2 emissions during building construction have been performed. The purpose of this study is to analyze the CO2 emissions of an apartment housing during the construction process. The quantity of CO2 emissions associated with the utilization of selected building materials and construction equipment were used to estimate the CO2 emissions related to the apartment housing life cycle. In order to set the system boundary for the construction materials, equipment, and transportation used, 13 types of construction work were identified; then the CO2 emissions produced by the identified materials were calculated for each type of construction work. The comprehensive results showed that construction work involving reinforced concrete accounted for more than 73% of the total CO2 emissions. The CO2 emissions related to reinforced concrete work was mainly due to transportation from the supplier to the construction site. Therefore, at the time that reinforced concrete is being supplied, shipping distance and fuel economy management of concrete transportation vehicles should be considered thoroughly for significant reduction of CO2 emissions.

  8. Construction safety in DOE. Part 1, Students guide

    Energy Technology Data Exchange (ETDEWEB)

    Handwerk, E C

    1993-08-01

    This report is the first part of a compilation of safety standards for construction activities on DOE facilities. This report covers the following areas: general safety and health provisions; occupational health and environmental control/haz mat; personal protective equipment; fire protection and prevention; signs, signals, and barricades; materials handling, storage, use, and disposal; hand and power tools; welding and cutting; electrical; and scaffolding.

  9. Occupational safety issues in residential construction surveyed in Wisconsin, United States.

    Science.gov (United States)

    Choi, Sang D; Carlson, Kathryn

    2014-01-01

    Residential construction is a high-risk industry in the U.S. due to the exposure to work-related safety hazards and fall injuries. This study aimed to examine the safety training and safe work practices of construction workers within the small residential construction industry. In order to achieve the study objectives, a survey was designed and sent to approximately 200 Wisconsin based residential construction contractors. About one third of the respondents stated that they did not have any form of safety programs. The study indicated that the most common types of work-related injuries in residential construction were slips/trips/falls and cuts/lacerations. The survey findings also suggested that the residential construction contractors needed to increase the utilization of fall protection safety equipment. Further education and subject matter expert training could provide benefits to improve occupational safety and health of the small business workforce in the residential construction industry.

  10. Development of fragility descriptions of equipment for seismic risk assessment of nuclear power plants

    International Nuclear Information System (INIS)

    Hardy, G.S.; Campbell, R.D.

    1983-01-01

    Probabilistic risk assessment (PRA) of a nuclear power plant for postulated hazard requires the development of fragility relationships for the plants' safety related equipment. The objective of this paper is to present some general results and conclusions concerning the development of these seismic fragility levels. Participation in fragility-related research and experience gained from the completion of several PRA studies of a variety of nuclear power plants have provided much insight as to the most vulnerable equipment and the most efficient use of resources for development of fragilities. Plants studied had seismic design bases ranging from very simple equivalent static analysis for some of the earlier plants to state-of-the-art complex multimode dyanamic analyses for plants currently under construction. Increased sophistication and rigor in seismic qualification of equipment has resulted for the most part in increased seismic resistance. The majority of equipment has been found, however, to possess more than adequate resistance to seismic loading regardless of the degree of sophistication utilized in design as long as seismic loading was included in the design process. This paper presents conclusions of the authors as to which items of equipment typically require an individual ''plant-specific'' fragility analysis and which can be treated in a generic fashion. In addition, general conclusions on the relative seismic capacity levels and most frequent failure modes are summarized for generic equipment groups

  11. The basic discussion on nuclear power safety improvement based on nuclear equipment design

    International Nuclear Information System (INIS)

    Zhao Feiyun; Yao Yangui; Yu Hao; He Yinbiao; Gao Lei; Yao Weida

    2013-01-01

    The safety of strengthening nuclear power design was described based on nuclear equipment design after Fukushima nuclear accident. From these aspects, such as advanced standard system, advanced design method, suitable test means, consideration of beyond design basis event, and nuclear safety culture construction, the importance of nuclear safety improvement was emphatically presented. The enlightenment was given to nuclear power designer. (authors)

  12. Remote handling equipment

    International Nuclear Information System (INIS)

    Clement, G.

    1984-01-01

    After a definition of intervention, problems encountered for working in an adverse environment are briefly analyzed for development of various remote handling equipments. Some examples of existing equipments are given [fr

  13. Construction safety program for the National Ignition Facility

    International Nuclear Information System (INIS)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF. During this period, all workers are required to implement measures to create a universal awareness which promotes safe practice at the work site, and which will achieve NIF's management objectives in preventing accidents and illnesses. Construction safety for NIF is predicated on everyone performing their jobs in a manner which prevents job-related disabling injuries and illnesses. The CSP outlines the minimum environment, safety, and health (ES ampersand H) standards, LLNL policies and the Construction Industry Institute (CII) Zero Injury Techniques requirements that all workers at the NIF construction site shall adhere to during the construction period of NIF. It identifies the safety requirements which the NIF organizational Elements, construction contractors and construction subcontractors must include in their safety plans for the construction period of NIF, and presents safety protocols and guidelines which workers shall follow to assure a safe and healthful work environment. The CSP also identifies the ES ampersand H responsibilities of LLNL employees, non-LLNL employees, construction contractors, construction subcontractors, and various levels of management within the NIF Program at LLNL. In addition, the CSP contains the responsibilities and functions of ES ampersand H support organizations and administrative groups, and describes their interactions with the NIF Program

  14. Construction safety program for the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Cerruti, S.J.

    1997-01-01

    The Construction Safety Program (CSP) for NIF sets forth the responsibilities, guidelines, rules, policies and regulations for all workers involved in the construction, special equipment installation, acceptance testing, and initial activation and operation of NIF at LLNL during the construction period of NIF. During this period, all workers are required to implement measures to create a universal awareness which promotes safe practice at the work site, and which will achieve NIF`s management objectives in preventing accidents and illnesses. Construction safety for NIF is predicated on everyone performing their jobs in a manner which prevents job-related disabling injuries and illnesses. The CSP outlines the minimum environment, safety, and health (ES&H) standards, LLNL policies and the Construction Industry Institute (CII) Zero Injury Techniques requirements that all workers at the NIF construction site shall adhere to during the construction period of NIF. It identifies the safety requirements which the NIF organizational Elements, construction contractors and construction subcontractors must include in their safety plans for the construction period of NIF, and presents safety protocols and guidelines which workers shall follow to assure a safe and healthful work environment. The CSP also identifies the ES&H responsibilities of LLNL employees, non-LLNL employees, construction contractors, construction subcontractors, and various levels of management within the NIF Program at LLNL. In addition, the CSP contains the responsibilities and functions of ES&H support organizations and administrative groups, and describes their interactions with the NIF Program.

  15. Construction and maintenance of underground mine roads

    Energy Technology Data Exchange (ETDEWEB)

    Logan, A.S.; Seedsman, R.W. [Coffey Partners International Pty. Ltd. (Australia)

    1995-12-31

    Good roads are essential in moving men and materials to and from the underground workplace. An underground coal industry funded project was recently completed on underground mine road construction and maintenance. This paper discusses practical approaches to construction and maintenance of underground mine roads using transferable civil technologies and innovative techniques. Mine pavements are generally low-cost (relative to civil roads), constructed to varying standards using locally available materials to best meet the mobility needs of the mine. Performance of pavements is thus largely dependent on the environmental conditions, quality of the available road making materials, maintenance policies and available resources. This paper explains the causes of bad roads in various underground environments. It details available management strategies, construction and water control techniques, road maintenance and vehicle considerations. It concludes that the trend to larger rubber tires mining equipment needs to be matched with construction and maintenance of high quality road surfaces. For large operations, the total cost due to poor roads may equate to in excess of $A1 million per annum. The strategies outlined in this paper provide the basis for construction and maintenance of underground mine roads to help achieve desired production targets. (author). 2 tabs., 4 figs., 7 refs.

  16. Modeling Of Construction Noise For Environmental Impact Assessment

    Directory of Open Access Journals (Sweden)

    Mohamed F. Hamoda

    2008-06-01

    Full Text Available This study measured the noise levels generated at different construction sites in reference to the stage of construction and the equipment used, and examined the methods to predict such noise in order to assess the environmental impact of noise. It included 33 construction sites in Kuwait and used artificial neural networks (ANNs for the prediction of noise. A back-propagation neural network (BPNN model was compared with a general regression neural network (GRNN model. The results obtained indicated that the mean equivalent noise level was 78.7 dBA which exceeds the threshold limit. The GRNN model was superior to the BPNN model in its accuracy of predicting construction noise due to its ability to train quickly on sparse data sets. Over 93% of the predictions were within 5% of the observed values. The mean absolute error between the predicted and observed data was only 2 dBA. The ANN modeling proved to be a useful technique for noise predictions required in the assessment of environmental impact of construction activities.

  17. Communications among elements of a space construction ensemble

    Science.gov (United States)

    Davis, Randal L.; Grasso, Christopher A.

    1989-01-01

    Space construction projects will require careful coordination between managers, designers, manufacturers, operators, astronauts, and robots with large volumes of information of varying resolution, timeliness, and accuracy flowing between the distributed participants over computer communications networks. Within the CSC Operations Branch, we are researching the requirements and options for such communications. Based on our work to date, we feel that communications standards being developed by the International Standards Organization, the CCITT, and other groups can be applied to space construction. We are currently studying in depth how such standards can be used to communicate with robots and automated construction equipment used in a space project. Specifically, we are looking at how the Manufacturing Automation Protocol (MAP) and the Manufacturing Message Specification (MMS), which tie together computers and machines in automated factories, might be applied to space construction projects. Together with our CSC industrial partner Computer Technology Associates, we are developing a MAP/MMS companion standard for space construction and we will produce software to allow the MAP/MMS protocol to be used in our CSC operations testbed.

  18. Toshiba's developments on construction techniques of nuclear power plants

    International Nuclear Information System (INIS)

    Hayashi, Y.; Itoh, N.

    1987-01-01

    Reliable and economic energy supplies are fundamental requirements of energy policies in Japan. To accomplish these needs, nuclear power plants are being increased in Japan. In recent years, construction cost increases and schedule extensions have affected the capital cost of nuclear energy, compared with fossil power plants, due to lower costs of oil and coal. On the other hand, several severe regulations have been applied to nuclear power plant designs. High-quality and cooperative engineering and harmonized design of equipment and parts are strongly required. Therefore, reduced construction costs and scheduling, as well as higher quality and reliability, are the most important items for nuclear industry. Toshiba has developed new construction techniques, as well as design and engineering tools for control and management, that demonstrate the positive results achieved in the shorter construction period of 1100-MW(electric) nuclear power plants. The normal construction period so far is 64 months, whereas the current construction period is 52 months. (New construction techniques are partially applied). In future years, the construction period will be lowered to 48 months. (New construction techniques are fully applied). A construction period is defined as time from the start of rock inspection to the start of commercial operation

  19. Order No. 217 of 29 April 1977 on X-ray diagnostic equipment for medical use

    International Nuclear Information System (INIS)

    1978-01-01

    This Order was made by the National Health Service and is divided into several parts covering inter alia approval and notification of X-ray installations, conditions of liability, occupational radiation protection, construction of X-ray apparatus and its shielding and inspection of such equipment by the National Health Service. (NEA) [fr

  20. Construction of an open tin cell at Inmetro

    Science.gov (United States)

    da Silva, R.; Teixeira, R. N.

    2013-09-01

    For the last decade, the Thermometry Laboratory of the National Institute of Metrology, Quality and Technology (INMETRO) has been developing its own primary standards. In late 2010, a brand new fixed point cell containing high purity tin (99.9999 %) was constructed as the continuation of a project for constructing metal fixed-point cells in the positive range, in accordance with the temperature fixed-points described by the International Temperature Scale of 1990 (ITS-90) [1]. This is the fourth temperature fixed-point constructed by the laboratory team, which enables the performance of some calibrations without having to rely solely on commercially available cells. The materials and their preparation, the design, the procedures for the construction of the cell, the equipment, the investigation on its performance and its results will be detailed in the present paper. In addition, it is worth mentioning that this cell has recently taken part in a bilateral comparison with the National Physical Laboratory - NPL.

  1. Used energy-related laboratory equipment grant program for institutions of higher learning. Eligible equipment catalog

    Energy Technology Data Exchange (ETDEWEB)

    1994-07-01

    This is a listing of energy related equipment available through the Energy-Related Laboratory Equipment Grant Program which grants used equipment to institutions of higher education for energy-related research. Information included is an overview of the program, how to apply for a grant of equipment, eligibility requirements, types of equipment available, and the costs for the institution.

  2. Equipment repair in coal mines

    Energy Technology Data Exchange (ETDEWEB)

    Zhang, S

    1982-01-01

    Most equipment in Chinese coal mines consists of machinery and equipment produced in the 1950s; the efficiency of 4-62, CTD-57 and 70B/sub 2/ ventilators is 15% lower than that of new ones; that of SSM and AYaP pumps, 10% lower than of modern ones. Equipment renovation is done in three ways: replacing obsolete equipment with new equipment of the same type; improving the performance of existing equipment by introducing efficiency and reconstruction; and replacing obsolete equipment with advanced equipment. It is indicated that the second way, for example, replacement of 4-62 ventilator blades with a maximum efficiency of 73% by 4-72 ventilator blades raises its efficiency to 90%. Replacing the 8DA-8x3 water pump, having a maximum efficiency of 63%, with the 200D 43x3 pump with a maximum efficiency of 78%, enables an electricity savings of 7000 yuan per year, which exceeds all replacement costs (600 yuan). The need to improve equipment maintenance and preventive work to increase equipment service life and to introduce new techniques and efficiency is noted.

  3. Protective and Catching Safety Systems In Construction

    Directory of Open Access Journals (Sweden)

    Kuzhin Marat

    2017-01-01

    Full Text Available In the article is described application of protective and catching systems in construction. Classification of similar systems, their types and purpose are listed. Dangerous zones on construction site and events to for limiting their influence or protection from the factors. Protective and catching systems is one of the most effective technical equipment, applied in recent time. Protective fences and catching systems are important part in the problem solution. Protective fences protect workers from falling from height. Protective and catching systems allows avoid injuries by workers, also catch debris, fallen from constructing buildings. In regard with continuing development in technical and technological solutions, protective and catching systems require adaptation to a new requirements of construction industry and requirements of normative documents. Technical regulations in the appliance sphere of protective and catching systems requires actualization and aligning with modern normatives. Important role should be given to developing organizational and technological documentation for application of the systems. Scientific studying of technical parameters of fences and protective catching nets also has great interest.

  4. BP volume reduction equipment

    International Nuclear Information System (INIS)

    Kitamura, Yoshinori; Muroo, Yoji; Hamanaka, Isao

    2003-01-01

    A new type of burnable poison (BP) volume reduction system is currently being developed. Many BP rods, a subcomponent of spent fuel assemblies are discharged from nuclear power reactors. This new system reduces the overall volume of BP rods. The main system consists of BP rod cutting equipment, equipment for the recovery of BP cut pieces, and special transport equipment for the cut rods. The equipment is all operated by hydraulic press cylinders in water to reduce operator exposure to radioactivity. (author)

  5. Exercise Equipment: Neutral Buoyancy

    Science.gov (United States)

    Shackelford, Linda; Valle, Paul

    2016-01-01

    Load Bearing Equipment for Neutral Buoyancy (LBE-NB) is an exercise frame that holds two exercising subjects in position as they apply counter forces to each other for lower extremity and spine loading resistance exercises. Resistance exercise prevents bone loss on ISS, but the ISS equipment is too massive for use in exploration craft. Integrating the human into the load directing, load generating, and motion control functions of the exercise equipment generates safe exercise loads with less equipment mass and volume.

  6. 22 CFR 135.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  7. 21 CFR 1403.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  8. 45 CFR 602.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  9. 49 CFR 18.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  10. 34 CFR 80.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  11. 10 CFR 600.232 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  12. 45 CFR 1183.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... specifically permitted or contemplated by Federal statute. (4) When acquiring replacement equipment, the...) Management requirements. Procedures for managing equipment (including replacement equipment), whether... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no...

  13. The construction of distant total distributed measuring and controlling system based on RS-232 communication

    International Nuclear Information System (INIS)

    Shi Chengying; Li Tiantuo; Zhu Wenkai; Zhang Quanhu

    1999-01-01

    The author discusses the construction of distant total distributed measuring and controlling system based on RS-232 communication. The merits of this system are simple construction, reliable performance, big communication distance, and wide covering range. The system fits in with application in radiation environment. The author also discusses the system's hardware equipment and communication protocol

  14. Advanced Construction of Compact Containment BWR

    International Nuclear Information System (INIS)

    Takahashi, M.; Maruyama, T.; Mori, H.; Hoshino, K.; Hijioka, Y.; Heki, H.; Nakamaru, M.; Hoshi, T.

    2006-01-01

    fabricate and perform pressure-test at the factory and transport to the construction-site as a module. Basing on CCR design concept of simplification and compact, reactor building layout design has been carried out. Layout design has been performed taking into account module construction, reduced system and components and compact PCV. As a result, CCR's reactor building, specific volume to power output value is almost equal to ABWR one. Module fabrication and construction method is promising technology from the points of construction duration shortening and construction cost reduction. Electrical equipment are piled up to multi-layer and connected and tested at the factory and transported to the construction-site in one module. Other equipment rooms and areas are also built into the various pre-fabricated module types in CCR construction. The construction of the CCR by the large module is planned to achieve only 24-month construction period from bedrock inspection to commercial operation. The CCR has possibilities of attaining both economical and safe small reactor by simplified system and compact PCV technologies with advanced construction. (authors)

  15. Development of manufacturing equipment and QC equipment for DUPIC fuel

    International Nuclear Information System (INIS)

    Yang, Myung Seung; Park, J.J.; Lee, J.W.; Kim, S.S.; Yim, S.P.; Kim, J.H.; Kim, K.H.; Na, S.H.; Kim, W.K.; Shin, J.M.; Lee, D.Y.; Cho, K.H.; Lee, Y.S.; Sohn, J.S.; Kim, M.J.

    1999-05-01

    In this study, DUPIC powder and pellet fabrication equipment, welding system, QC equipment, and fission gas treatment are developed to fabricate DUPIC fuel at IMEF M6 hot cell. The systems are improved to be suitable for remote operation and maintenance with the manipulator at hot cell. Powder and pellet fabrication equipment have been recently developed. The systems are under performance test to check remote operation and maintenance. Welding chamber and jigs are designed and developed to remotely weld DUPIC fuel rod with manipulators at hot cell. Remote quality control equipment are being tested for analysis and inspection of DUPIC fuel characteristics at hot cell. And trapping characteristics is analyzed for cesium and ruthenium released under oxidation/reduction and sintering processes. The design criteria and process flow diagram of fission gas treatment system are prepared incorporating the experimental results. The fission gas treatment system has been successfully manufactured. (Author). 33 refs., 14 tabs., 91 figs

  16. Construction, characteristics and present status of high-fluence irradiation facility at University of Tokyo

    International Nuclear Information System (INIS)

    Tabata, Yoneho; Kobayashi, Hitoshi; Tagawa, Seiichi; Kouchi, Noriyuki.

    1989-01-01

    New ion accelerator facility (HIT Facility) was constructed at Research Center for Nuclear Science and Technology, University of Tokyo. This facility, which was equipped with some special apparatus, has been mainly dedicated to the study of radiation effects of ion beams on materials. In this report, the construction, the characteristics and the present status of this facility are described. (author)

  17. Some special problems during the planning and construction of the Paks nuclear power station

    International Nuclear Information System (INIS)

    Szilagyi, Gyula; Szalai, Geza; Ferenczy, Gabor; Sarkoezy, Endre; Daniel, Gabor

    1984-01-01

    The construction of the power plant building using cradle case technology is outlined. The planning and construction of the auxiliary building for waste storage, for water-treatment equipment and others are described. The planning and specifications of a part of the electrical and control systems are presented briefly. Finally, the use of computer-aided design techniques is mentioned. (R.P.)

  18. Proceedings of the European Symposium on Pressure Equipment - ESOPE 2007; Actes des Journees d'Etudes Europeennes Equipements sous Pression - ESOPE 2007

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    Every three years, and since thirty years, the AFIAP organizes a symposium where the experts and actors working in the field of pressure equipments, whether fixed or transportable, can meet and exchange on all developments related to their activity. What was at first called the 'National Congress on the technology of pressure components', and later the 'Study Days on pressure components', became since 2001 the 'European Symposium on Pressure Equipment' (ESOPE), so marking an opening to the European and International fields in a context marked by the application of the European Directives applicable to these equipments. The 2001 symposium was more particularly dedicated to the application of the directives harmonizing the construction of equipments, and the 2004 symposium was more particularly centred on the management of equipments in operation. For the ESOPE 2007 Symposium, the organizing committee wished to resume these two subjects under the aspects of the safety, the competitiveness, as well as the innovation. The plenary session of the last day will be completely dedicated to these subjects and will include a Panel discussion, where National and European authorities, representatives of manufacturers and users, as well as experts engaged in developments and new projects will express their views. These exchanges will also permit to answer the questions expressed by the participants. Every symposium has thus a main orientation, but shall also be the place of exchanges on the different subjects wished by the profession. The traditional technical sessions are consequently maintained: - Sessions on Design and Materials, - Sessions on Fabrication, - Sessions on Fitness for Service, and a special session dedicated to the National, European and International Codes is added, the afternoon of the first day. The plenary Opening session is also devoted to this last subject with lectures on the evolutions of European regulations, the

  19. Setting up processes and standardization of the equipment in order to optimize analyses of the wavelength dispersion X-ray fluorescence (WDXRF) system

    International Nuclear Information System (INIS)

    Phan Trong Phuc; Luu Anh Tuyen; La Ly Nguyen; Nguyen Thi Ngoc Hue; Pham Thi Hue; Do Duy Khiem

    2015-01-01

    For the purpose of operating and optimizing the analyses of the equipment: wavelength dispersion X-ray fluorescence (WDXRF)- model S8 TIGER from Enhancing Equipment Project (TCTTB) 2011-2012, we set up sampling and analytical process for different sample kinds; we constructed multi-elemental calibration curve for clay sample; we analysed elemental concentrations of 5 clay samples by XRF method and compared the results with the results given by NAA method. Equipment sensitivity was tested by analysing elemental concentrations of 2 Kaolin standard samples. The results show that S8-Tiger equipment is within good condition and is able to analyze powder clay sample exactly. (author)

  20. Developing ''smar'' equipment and systems through collaborative NERI research and development

    International Nuclear Information System (INIS)

    Harmon, Daryl L.; Chapman, Leon D.; Golay, Michael W.; Maynard, Kenneth P.; Spencer, Joseph W.

    2000-01-01

    The United States Department of Energy initiated the Nuclear Energy Research Initiative (NERI) to conduct research and development with the objectives of : (1) overcoming the principal technical obstacles to expanded nuclear energy use, (2) advancing the state of nuclear technology to maintain its competitive position in domestic and world markets, and (3) improving the performance, efficiency, reliability, and economics of nuclear energy. Fiscal Year 1999 program funding is $19 Million, with increased funding expected for subsequent years, emphasizing international cooperation. Among the programs selected for funding is the S mart Equipment and Systems to Improve Reliability and Safety in Future Nuclear Power Plant Operations . This program is a 30 month collaborative effort bringing together the technical capabilities of ABB C-E Nuclear Power, Inc. (ABBCENP), Sandia National Laboratories, Duke Engineering and Services (DEandS), Massachusetts Institute of Technology (MIT) and Pennsylvania State University (PSU). The program's goal is to design, develop and evaluate an integrated set of ''smart'' equipment and predicitve maintenance tools and methodologies that will significantly reduce nuclear plant construction, operation and maintenance costs. To accomplish this goal the ''smart'' quipment program will: 1. Identify the prioritize nulcear plant equipment that would most likely benefit from adding smart features, 2. Developa methodology for systematically monitoring the health of individual pieces of equipment implemented with smart features (i. e. ''smart'' equipment), 3. Developa methodology to provide plant operators with real-time information through ''smart'' equipment Man-Machine Interfaces (MMI) to support their decision making, 4. Demonstrate the methodology on a targeted component and/or system, 5. Expand the concept to system and plant levels that allow communication and integration of data among smart equipment. This paper will discuss (1) detailed

  1. 45 CFR 1174.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  2. 45 CFR 1157.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use... requirements. Procedures for managing equipment (including replacement equipment), whether acquired in whole or... original or replacement equipment acquired under a grant or subgrant is no longer needed for the original...

  3. Division of Mechanical Construction - Overview

    International Nuclear Information System (INIS)

    Halik, J.

    2000-01-01

    Full text: The Department of Mechanical Construction consists of the Design Group and the Mechanical Workshop. The activity of the Department includes the following:- designs of devices and equipment for experiments in physics and their mechanical construction and assembly, particularly vacuum chambers and installations for HV and UHV; - maintenance and upgrading of the existing installations and equipment in our Institute; - participation of our engineers and technicians in design works, equipment assembly and maintenance for experiments in foreign laboratories. The Design Group is equipped with PC-computers and AutoCad graphic software (release 12 and 13) what allows to make drawings and a mechanical documentation which meets world standards. Also ANSYS (version 5.2) - a software for mechanical, heat and magnetic calculations using finite-elements methods is used in our design activity. The Mechanical Workshop can offer a wide range of machining and treatment methods with satisfactory tolerances and surface quality. The Workshop offers the following possibilities: - turning - cylindrical elements of a length up to 2000 mm and a diameter up to 400 mm, and also disc-type elements of a diameter up to 600 mm and a length not exceeding 300 mm; - milling - elements of length up to 1000 mm and gear wheels of diameter up to 300 mm; - grinding - flat surfaces of dimensions up to 300 mm x 1000 mm and cylindrical elements of a diameter up to 200 mm and a length up to 800 mm; - drilling - holes of a diameter up to 50 mm; - welding - electrical and gas welding, including TIG vacuum-tight welding; - soft and hard soldering; - mechanical works including precision engineering; - plastics treatment - machining and polishing using diamond milling, modelling, lamination of various shapes and materials, including plexiglas, scintillators and light-guides; - painting - paint spraying with possibility of using furnace-fired drier of internal dimensions of 800 mm x 800 mm x 800 mm. Our

  4. Inventory Control: Construction of a Photoelectric Colorimeter and Application to Students' Experiments (Part 2).

    Science.gov (United States)

    Matsuo, Tsutomu; And Others

    1989-01-01

    Discussed are the construction and uses of a version of a photoelectric colorimeter by students. Included are materials needed and four experiments which use the equipment. Sample results are shown. (CW)

  5. Report on further development of the Winfrith Modular Containment System and associated equipment

    International Nuclear Information System (INIS)

    Sanders, M.J.; Pengelly, M.G.A.

    1987-12-01

    The Winfrith modular containment system was developed to enable redundant plutonium processing plant to be safely decommissioned. As a result of operational experience the need for a lifting aid to facilitate the decommissioning of tall plant, a 2-stage mobile ventilation system and an improved shower entry tunnel was identified. Improved plant and equipment has been designed, constructed and tested and the results are presented here. (author)

  6. PROBLEMS PERTAINING TO DIVERSIFICATION OF CIVIL EQUIPMENT IN EQUIPMENT OF MILITARY PURPOSE

    OpenAIRE

    A. I. Kotlabay; V. A. Korobkin; V. F. Tamelo; I. V. Kostko; S. V. Kondratiev

    2009-01-01

    Study of directions concerning development of military equipment, its modernization with the purpose to improve its military efficiency is an actual problem for the Armed Forces, military science, designers and researchers.The paper analyzes and estimates possibilities to use civil equipment for military purpose. Problems pertaining to technologies of double application, diversification of civil equipment in military engineering machinery are considered in the paper.

  7. 20 CFR 437.32 - Equipment.

    Science.gov (United States)

    2010-04-01

    ... contemplated by Federal statute. (4) When acquiring replacement equipment, the grantee or subgrantee may use.... Procedures for managing equipment (including replacement equipment), whether acquired in whole or in part... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Equipment. 437.32 Section 437.32 Employees...

  8. Radiation hardened equipment and material data base

    International Nuclear Information System (INIS)

    Sumita, Kenji; Yamaoka, Hitoshi; Kakuta, Tsunemi; Shono, Yoshihiko; Nakamura, Tetsuo; Nakase, Yoshiaki; Furuta, Junichiro.

    1988-01-01

    In order to collect and put in order the results regarding radiation-withstanding equipment and materials, the Osaka Nuclear Science Association organized the committee composed of the experts in various fields in fiscal year 1986 for the purpose of building up the data base, and began the activity. From the trend of the research and development and the usefulness for the future, the fields of collecting data were decided as organic materials, optical fibers, semiconductor elements and compound semiconductors. By fiscal year 1987, the building-up of the prototype data base was aimed at, and system configuration, the making of the formats on the items and attributes of collected data, the action test of the system and so on were carried out. Under the background of the upgrading of LWRs, the development of FBRs and nuclear fusion reactors, the construction of a reprocessing plant and a low level waste storage facility, and the progress of various advanced technologies, the research on the equipment and materials having excellent radiation resistance and the development for heightening the performance have been carried out in many places separately, accordingly the activity for building up the prototype data base was begun, and about 600 cases were collected. (Kako, I.)

  9. Interim staff position on environmental qualification of safety-related electrical equipment: including staff responses to public comments. Regulatory report

    International Nuclear Information System (INIS)

    Szukiewicz, A.J.

    1981-07-01

    This document provides the NRC staff positions regarding selected areas of environmental qualification of safety-related electrical equipment, in the resolution of Unresolved Safety Issue A-24, 'Qualification of Class IE Safety-Related Equipment.' The positions herein are applicable to plants that are or will be in the construction permit (CP) or operating license (OL) review process and that are required to satisfy the requirements set forth in either the 1971 or the 1974 version of IEEE-323 standard

  10. Effectiveness of Taxicab Security Equipment in Reducing Driver Homicide Rates

    Science.gov (United States)

    Menéndez, Cammie K.C.; Amandus, Harlan E.; Damadi, Parisa; Wu, Nan; Konda, Srinivas; Hendricks, Scott A.

    2015-01-01

    Background Taxicab drivers historically have had one of the highest work-related homicide rates of any occupation. In 2010 the taxicab driver homicide rate was 7.4 per 100,000 drivers, compared to the overall rate of 0.37 per 100,000 workers. Purpose Evaluate the effectiveness of taxicab security cameras and partitions on citywide taxicab driver homicide rates. Methods Taxicab driver homicide rates were compared in 26 major cities in the U.S. licensing taxicabs with security cameras (n=8); bullet-resistant partitions (n=7); and cities where taxicabs were not equipped with either security cameras or partitions (n=11). News clippings of taxicab driver homicides and the number of licensed taxicabs by city were used to construct taxicab driver homicide rates spanning 15 years (1996–2010). Generalized estimating equations were constructed to model the Poisson-distributed homicide rates on city-specific safety equipment installation status, controlling for city homicide rate and the concurrent decline of homicide rates over time. Data were analyzed in 2012. Results Cities with cameras experienced a threefold reduction in taxicab driver homicides compared with control cities (RR=0.27; 95% CI=0.12, 0.61; p=0.002). There was no difference in homicide rates for cities with partitions compared with control cities (RR=1.15; 95% CI=0.80, 1.64; p=0.575). Conclusions Municipal ordinances and company policies mandating security cameras appear to be highly effective in reducing taxicab driver deaths due to workplace violence. PMID:23790983

  11. Free-world microelectronic manufacturing equipment

    Science.gov (United States)

    Kilby, J. S.; Arnold, W. H.; Booth, W. T.; Cunningham, J. A.; Hutcheson, J. D.; Owen, R. W.; Runyan, W. R.; McKenney, Barbara L.; McGrain, Moira; Taub, Renee G.

    1988-12-01

    Equipment is examined and evaluated for the manufacture of microelectronic integrated circuit devices and sources for that equipment within the Free World. Equipment suitable for the following are examined: single-crystal silicon slice manufacturing and processing; required lithographic processes; wafer processing; device packaging; and test of digital integrated circuits. Availability of the equipment is also discussed, now and in the near future. Very adequate equipment for most stages of the integrated circuit manufacturing process is available from several sources, in different countries, although the best and most widely used versions of most manufacturing equipment are made in the United States or Japan. There is also an active market in used equipment, suitable for manufacture of capable integrated circuits with performance somewhat short of the present state of the art.

  12. 34 CFR 74.34 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... as program income. (e) When acquiring replacement equipment, the recipient may use the equipment to... replacement equipment subject to the approval of the Secretary. (f) The recipient's property management... 34 Education 1 2010-07-01 2010-07-01 false Equipment. 74.34 Section 74.34 Education Office of the...

  13. 45 CFR 2541.320 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... replacement equipment, the grantee or subgrantee may use the equipment to be replaced as a trade-in or sell... replacement equipment), whether acquired in whole or in part with grant funds, until disposition takes place... ensure the highest possible return. (e) Disposition. When original or replacement equipment acquired...

  14. Visual communication and terminal equipment

    International Nuclear Information System (INIS)

    Kang, Cheol Hui

    1988-06-01

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  15. Visual communication and terminal equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kang, Cheol Hui

    1988-06-15

    This book is divided two parts about visual communication and terminal equipment. The first part introduces visual communication, which deals with foundation of visual communication, technique of visual communication, equipment of visual communication, a facsimile and pictorial image system. The second part contains terminal equipment such as telephone, terminal equipment for data transmission on constitution and constituent of terminal equipment for data transmission, input device and output device, terminal device and up-to-date terminal device.

  16. Equipment design guidance document for flammable gas waste storage tank new equipment

    International Nuclear Information System (INIS)

    Smet, D.B.

    1996-01-01

    This document is intended to be used as guidance for design engineers who are involved in design of new equipment slated for use in Flammable Gas Waste Storage Tanks. The purpose of this document is to provide design guidance for all new equipment intended for application into those Hanford storage tanks in which flammable gas controls are required to be addressed as part of the equipment design. These design criteria are to be used as guidance. The design of each specific piece of new equipment shall be required, as a minimum to be reviewed by qualified Unreviewed Safety Question evaluators as an integral part of the final design approval. Further Safety Assessment may be also needed. This guidance is intended to be used in conjunction with the Operating Specifications Documents (OSDs) established for defining work controls in the waste storage tanks. The criteria set forth should be reviewed for applicability if the equipment will be required to operate in locations containing unacceptable concentrations of flammable gas

  17. Environmental/dynamic mechanical equipment qualification and dynamic electrical equipment qualification program (EDQP)

    International Nuclear Information System (INIS)

    Hunter, J.A.

    1984-01-01

    Equipment qualification research is being conducted to investigate acceptable criteria, requirements, and methodologies for the dynamic (including seismic) and environmental qualification of mechanical equipment and for the dynamic (including seismic) qualification of electrical equipment. The program is organized into three elements: (1) General Research, (2) Environmental Research, and (3) Dynamic Research. This paper presents the highlights of the results to date in these three elements of the program

  18. Construction of calibration curve for accountancy tank

    International Nuclear Information System (INIS)

    Kato, Takayuki; Goto, Yoshiki; Nidaira, Kazuo

    2009-01-01

    Tanks are equipped in a reprocessing plant for accounting solution of nuclear material. The careful measurement of volume in tanks is very important to implement rigorous accounting of nuclear material. The calibration curve relating the volume and level of solution needs to be constructed, where the level is determined by differential pressure of dip tubes. Several calibration curves are usually employed, but it's not explicitly decided how many segment are used, where to select segment, or what should be the degree of polynomial curve. These parameters, i.e., segment and degree of polynomial curve are mutually interrelated to give the better performance of calibration curve. Here we present the construction technique of giving optimum calibration curves and their characteristics. (author)

  19. Use of Equipment Information System (EQUIS) to determine priority for purchasing safeguards equipment

    International Nuclear Information System (INIS)

    Silberberg, S.

    1988-01-01

    To manage its large world-wide inventory of safeguards equipment, the IAEA Safeguards department uses a computerized Equipment Information System (EQUIS). EQUIS data have been analyzed using Queueing Theory to determine if inventory is adequate to meet inspector demands and in those cases where it is inadequate, to indicate how many additional units should be procured. Results are tabulated for various types of non-destructive analysis (NDA) equipment. For equipment where there is a high turnover and hence a large amount of data, the analysis provides a powerful tool for assisting procurement decisions

  20. Collective contract in thermal equipment mounting process at the Balakovo NPP

    International Nuclear Information System (INIS)

    Shpol, E.A.; Goryashchenko, Yu.N.

    1986-01-01

    Experience of collective contract introduction into thermal equipment mounting process at the Balakovo NPP is briefly described.4627 thousand roubles are utilized and 45.6% of annual volume of works are made using the collective contract method in 1984 during reactor room construction at the Balakovo-1 NPP. Cost of works are reduced by 137.8 thousand roubles. The conclusion is made that the formation of large teams ( 45-70 men ) promotes labour productivity increase as well as high quality of works

  1. Equipment to evaluate in experimental form the thermal conductivity of the construction materials; Equipo para evaluar en forma experimental el coeficiente de conductividad termica de los materiales de construccion

    Energy Technology Data Exchange (ETDEWEB)

    Lopez C, Raymundo; Morales G, Juan R.; Diaz C, Alen; Lizardi R, Arturo [Universidad Autonoma Metropolitana-Azcapotzalco, Mexico, D. F. (Mexico); Vaca M, Mabel [Universidad Nacional Autonoma de Mexico, Mexico, D.F. (Mexico)

    2001-04-01

    An equipment meant to obtain the thermal conductivity coefficient was designed, constructed and evaluated. Convection losses in the experimental device were reduced by means of a vacuum chamber that wraps it. Conduction losses were minimized with the proper insulation. The tested materials are the most frequently used in the construction of buildings in Mexico, such as concrete, burnt brick, adobe and gypsum. Results observed are comparable to those reported in the literature. The essays done using the vacuum chamber produced values of thermal conductivity coefficient 3% lower than those obtained without using it. [Spanish] Se diseno, construyo y evaluo un equipo, con el cual se obtiene el coeficiente de conductividad termica en diversos materiales. En este se reducen las perdidas por conveccion, colocando una camara de vacio alrededor del conjunto de prueba. Las perdidas por conduccion se minimizan con un aislamiento adecuado. Los materiales evaluados son los que mas se utilizan en la construccion en Mexico, a saber, el concreto, el ladrillo cocido, el adobe y el yeso. Los valores obtenidos, sin considerar las perdidas por conveccion, se comparan con los de la literatura. Los ensayos utilizando la camara de vacio proporcionan valores del coeficiente de conductividad termica menores en 3% a los obtenidos sin dicha camara.

  2. Progress Report on the Construction of SOLEIL

    CERN Document Server

    Level, Marie Paule; Brunelle, Pascale; Chaput, Roger; Dael, Antoine; Denard, Jean-Claude; Filhol, Jean-Marc; Godefroy, Jean-Marie; Herbeaux, Christian; Le Roux, V; Marchand, Patrick; Nadji, Amor; Nadolski, Laurent S; Nagaoka, Ryutaro; Tordeux, M A

    2005-01-01

    This paper reports the progress achieved in the construction of the accelerators of SOLEIL. Started in January 2002, the construction comes near to its end and the installation of the equipment on the site has begun from September 2004 and shall be completed within one year. The progress on the LINAC and Booster are reported separately, therefore this paper will focus more particularly on the Storage Ring: Dedicated measuring benches have been built to perform the magnetic measurements on all the magnets and the results of measurements have been analysed in term of particle dynamics behaviour in order to prepare the operating point for the commissioning. The status of innovative developments engaged from the beginning as super-conducting RF cavities, NEG coated vacuum chambers and BPMs digital electronics will be described. The construction of the first 6 insertion devices is also well advanced and will be reported. Finally, the machine impedance budget was further evaluated with consequently, still some modi...

  3. Occupational skin problems in construction workers.

    Science.gov (United States)

    Shah, Kartik R; Tiwari, Rajnarayan R

    2010-10-01

    Construction workers handle cement which has constituents to produce both irritant contact dermatitis and corrosive effects (from alkaline ingredients, such as lime) and sensitization, leading to allergic contact dermatitis (from ingredients, such as chromium). The present study has been carried out among unorganized construction workers to find the prevalence of skin problems. The present cross-sectional study was conducted in 92 construction workers of Ahmedabad and Vadodara. All the workers were subjected to clinical examination after collection of information regarding demographic characteristics, occupational characteristics and clinical history on a predesigned proforma. Of them, 47.8% had morbid skin conditions. Frictional callosities in palm were observed in 18 (19.6%) subjects while 4 (4.3%) subjects had contact dermatitis. Other conditions included dry, fissured and scaly skin, infectious skin lesion, tinea cruris, lesion and ulcers on hands and/or soles. The skin conditions were common in the age group of 20-25 years, males, those having ≥1 year exposure and those working for longer hours. Half of the workers not using personal protective equipment had reported skin-related symptoms.

  4. Overall Equipment Effectiveness Implementation Criteria

    Science.gov (United States)

    Abramova, I. G.; Abramov, D. A.

    2018-01-01

    This article documents the methods applied in production control technics specifically focused on commonly used parameter OEE (Overall Equipment Effectiveness). The indicators of extensive and intensive use of equipment are considered. Their appointment this is comparison in the same type of production within the industry and comparison of single-type and / or different types of equipment in terms of capacity. However, it is shown that there is no possibility of revealing the reasons for the machine’s operation: productive / unproductive, with disturbances. Therefore, in the article reveals the approaches to calculating the indicator characterizing the direct operation of the equipment. The Machine Load coefficient is approaching closely to the indicator of the efficiency of the use of equipment. Methods analysis is proceeded through the historically applied techniques such as “Stopwatch” and “Motion” studies. Was performed the analysis of the efficiency index of OEE equipment using the comparable indexes performance of equipment in the Russian practice. An important indicator of OEE contains three components. The meaning of each of them reflects historically applicable indicators. The value of the availability of equipment indicator is close to the value of the equipment extensibility index. The value of the indicator of the efficiency of work can be compared with the characteristic of the capacity of the equipment and the indicator of the quality level can meet the requirements for compliance with the manufacturing technology. Shown that the sum of the values of the coefficient of “Availability” of the equipment and the value of the “Factor of compaction of working hours” are one. As well as the total value of the indicator “level of quality” and the coefficient of marriage given in the result unit. The measurability of the indicators makes it possible to make a prediction about efficiency of the equipment.

  5. Establishment for Nuclear Equipment: Overview

    International Nuclear Information System (INIS)

    Pracz, J.

    2000-01-01

    Full text: The main objective of the activity of the Establishment for Nuclear Equipment (ZdAJ) in 1999 was to obtain the ISO 9001 certificate. Work on this problem has been successfully completed. The changes introduced in agreement with requirements of ISO in supervising the construction, manufacturing and servicing eliminate possible deficiencies of our products and will pay in the future. Two new important ventures have been undertaken: design of an accelerator with two photon energies and a reconstruction of simulator directed towards better geometrical parameters. The completion of the improvements in accelerator is foreseen for the year 2002. The changes comprise almost all sub-assemblies of the device. The modernized simulator will be installed in the hospital already in the year 2000 - the ameliorations concern mainly the arm of the apparatus, collimator, driving gears and control system. Of course - apart from this, the routine production activity of the Establishment was continued in 1999. (author)

  6. Accelerating nano-technological innovation in the Danish construction industry

    DEFF Research Database (Denmark)

    Koch, Christian; Stissing Jensen, Jens

    2007-01-01

    . The institutional features of the system are furthermore poorly equipped at identifying potentials within high-tech areas. In order to exploit the potentials of nano-technology it is thus argued that an alternative TIS needs to be established. Initiatives should identify and support "incubation rooms" or marked......  By viewing the construction industry as a technological innovation system (TIS) this paper discusses possible initiatives to accelerate nanotechnological innovations. The point of departure is a recent report on the application of nano-technology in the Danish construction industry, which...... concludes that opportunities are generally poorly appreciated by the industry and research communities alike. It is found that the construction industry is characterised by low-tech trajectories where dedicated innovation networks are often too fragile for innovations to stabilize and diffuse...

  7. Construction of experimental HMA test sections in order to monitor the compaction process

    NARCIS (Netherlands)

    ter Huerne, Henderikus L.; Molenaar, A.A.A.; van de Ven, M.F.C.

    2003-01-01

    For getting better understanding about the process of HMA compaction, a test section was constructed while the governing process parameters, like; compaction progress, temperature of the material at which activities were employed, equipment properties and meteorological circumstances, were

  8. Rational use of energy in air conditioning equipment, through an appropriate selection of the main equipment; Uso racional de la energia en equipos de aire acondicionado, mediante la eleccion apropiada del equipo principal

    Energy Technology Data Exchange (ETDEWEB)

    Reyes Zuniga, Jose de Jesus; Herrera Ramos, Manuel [Instituto Mexicano del Petroleo (Mexico)

    1996-07-01

    This paper presents an analysis to diminish the consumption of energy in central air conditioning equipment through an appropriate selection of the equipment. The analysis shows the levels of security and toxicity of the refrigerant, the operational, constructive and economic advantages of the equipment, taking as reference the cooling demand and expenses of energy consumption, as well as the ecological impact derived from the use of the refrigerant. Finally, an economic analysis is presented, involving the expenses of the equipment, operation, maintenance, costs of the consumption of used fluids, et cetera. [Spanish] Uso racional de la energia en equipos de aire acondicionado, mediante la eleccion apropiada del equipo principal. Este trabajo presenta un analisis para disminuir el consumo de energia en los equipos centrales de aire acondicionado mediante la seleccion apropiada del equipo. El analisis muestra los niveles de seguridad y toxicidad del refrigerante, las ventajas operativas, constructivas y economicas del equipo, tomando como referencia la demanda de enfriamiento y gastos de consumo de energia, asi como el impacto ecologico derivado de su empleo del refrigerante. Finalmente, se presenta un analisis economico, involucrando los gastos del equipo, operacion, mantenimiento, costos de consumos de fluidos utilizados, etcetera.

  9. Estimation of visual maps with a robot network equipped with vision sensors.

    Science.gov (United States)

    Gil, Arturo; Reinoso, Óscar; Ballesta, Mónica; Juliá, Miguel; Payá, Luis

    2010-01-01

    In this paper we present an approach to the Simultaneous Localization and Mapping (SLAM) problem using a team of autonomous vehicles equipped with vision sensors. The SLAM problem considers the case in which a mobile robot is equipped with a particular sensor, moves along the environment, obtains measurements with its sensors and uses them to construct a model of the space where it evolves. In this paper we focus on the case where several robots, each equipped with its own sensor, are distributed in a network and view the space from different vantage points. In particular, each robot is equipped with a stereo camera that allow the robots to extract visual landmarks and obtain relative measurements to them. We propose an algorithm that uses the measurements obtained by the robots to build a single accurate map of the environment. The map is represented by the three-dimensional position of the visual landmarks. In addition, we consider that each landmark is accompanied by a visual descriptor that encodes its visual appearance. The solution is based on a Rao-Blackwellized particle filter that estimates the paths of the robots and the position of the visual landmarks. The validity of our proposal is demonstrated by means of experiments with a team of real robots in a office-like indoor environment.

  10. Estimation of Visual Maps with a Robot Network Equipped with Vision Sensors

    Directory of Open Access Journals (Sweden)

    Arturo Gil

    2010-05-01

    Full Text Available In this paper we present an approach to the Simultaneous Localization and Mapping (SLAM problem using a team of autonomous vehicles equipped with vision sensors. The SLAM problem considers the case in which a mobile robot is equipped with a particular sensor, moves along the environment, obtains measurements with its sensors and uses them to construct a model of the space where it evolves. In this paper we focus on the case where several robots, each equipped with its own sensor, are distributed in a network and view the space from different vantage points. In particular, each robot is equipped with a stereo camera that allow the robots to extract visual landmarks and obtain relative measurements to them. We propose an algorithm that uses the measurements obtained by the robots to build a single accurate map of the environment. The map is represented by the three-dimensional position of the visual landmarks. In addition, we consider that each landmark is accompanied by a visual descriptor that encodes its visual appearance. The solution is based on a Rao-Blackwellized particle filter that estimates the paths of the robots and the position of the visual landmarks. The validity of our proposal is demonstrated by means of experiments with a team of real robots in a office-like indoor environment.

  11. Study on layout and construction concept of DMS (modular simplified medium small reactor)

    International Nuclear Information System (INIS)

    Shizuka Hirako; Yuusuke Shimizu; Shigeru Yokouchi; Yoshinori Iimura; Yuuji Yasuda; Kumiaki Moriya; Takahiko Hida

    2005-01-01

    Nuclear power is expected to become the main source of electric power generation in Japan for reasons of energy security and prevention of CO 2 emissions. In addition, the recent slowdown of electric power demand and the liberalization of the electric power market are accelerating medium and small sized reactor development. Under these circumstances, DMS's (modular simplified and medium small reactors) have been developed as 400 MWe class LWR's supported by the Japan Atomic Power Company. In the development of medium and small sized reactors, the most important point is how to overcome the scale demerits. To this end, we have pursued not only the simplification of systems and equipment but also the standardization of layout and construction. The main technical feature of DMS's is the adoption of a natural circulation reactor with short length fuel. Short length fuel enables the reduction of RPV height as well as construction volume of the PCV and building volume. A natural circulation reactor has considerable rationalizing effects such as the elimination of re-circulation pumps and their drive power source. By applying simplified systems and equipment, a rationalized layout and construction method are adopted. To improve the constructability by means of modular construction methods, steel containment is applied. The PCV size is reduced to 17 m in diameter and 24 m in height by applying a dish-shaped drywell and eccentric RPV arrangement. By applying a compact PCV and concentrated equipment arrangement in building, it can be confirmed that the ratio of building volume per unit power is equivalent to that of existing large sized ABWRs. Furthermore, a steel plate reinforced concrete structure (SC structure) is applied to the building layout. The application of the compact PCV (steel containment) and the SC structure makes it easier to apply a large-scale module, such as an integrated steel containment and SC structure module, and an integrated multi-layer BM (building

  12. Modelling, simulation and construction of a dc/dc boost power converter: a school experimental system

    International Nuclear Information System (INIS)

    Silva-Ortigoza, R; Marciano-Melchor, M; Silva-Ortigoza, G; Hernández-Guzmán, V M; Saldaña-González, G; Marcelino-Aranda, M

    2012-01-01

    We introduce a dc/dc boost power converter as a didactic prototype intended to support courses on electric circuit analysis experimentally. The corresponding mathematical model is obtained, the converter is designed and an experimental setup is described, constructed and tested. Simplicity of construction as well as low cost of components renders the feasible introduction of this equipment in undergraduate laboratories. (paper)

  13. ACED devices and SECAF supports for the control of structure, pipe network and equipment behaviour at seismic movements in order to enhance the safety margin

    International Nuclear Information System (INIS)

    Serban, Viorel; Prisecaru, I.; Cretu, D.; Moldoveanu, T.

    2002-01-01

    In order to enhance the safety margin of structure, pipe networks and equipment associated to the existing NPPs, the classic consolidation solutions are very expensive and many times, impossible to be implemented. Structures, pipe networks, systems and equipment have geometries imposed by the basic construction requirements, operating and safety requirements and their modifications is not always possible. In order to enhance the strength capacity of (new or old) structures, systems and equipment mechanical devices with controlled elasticity and damping (ACED) have been designed, constructed and experimented. These devices are capable to support very large static loads over which dynamic loads (shock, vibration and seismic movements) overlap (which are damped). To increase the strength capacity of (new or existing) pipe networks and equipment connecting with pipes, SECAF supports that allow displacements from thermal expansions with low reaction force have been designed, constructed and experimented. SECAF supports are capable elastically to take permanent loads over which shocks, vibrations and seismic movements (which are damp) overlap. ACED devices and SECAF supports can be used to rehabilitate the existing NPPs with law financial costs and an increase of their strength capacity up to 100% under seismic movements, shocks and vibrations. ACED devices and SECAF supports do not require maintenance, are not affected by presence of a radiation field and their estimated service-life is similar to the NPPs

  14. Construction and modernization of underground and surface mines. [USSR

    Energy Technology Data Exchange (ETDEWEB)

    Burshtein, N M

    1983-12-01

    Development of the Sredazugol' association in Soviet Central Asia from 1976 to 1985 is discussed. From 1976 to 1980 investment in the association amounted to 151 million rubles, 87.5 million of which fell on construction. Major development projects of the 1976-1980 period are reviewed: construction of new mining levels in underground coal mines, development of a number of operating surface mines, modernization of earthmoving and mining equipment, development of mine haulage by locomotives and railroad cars, improving occupational safety in coal mining, increasing slope stability in surface mining, especially in the area of the Atchinsk landslide in the Angren mine. From 1981 to 1985 investment in the Sredazugol' association should amount to 202 million rubles, of which 126 million rubles will be spent on construction. Investment will be 35% higher than in the 1976-1980 period and investment in mine construction 43% higher. The largest development project will be modernization of the Angren surface mine and increasing its targeted coal output from 5.2 Mt/y to 10.3 Mt/y by 1990. Modernization and reconstruction of the Angren mine will be carried out in 2 stages. Coal output of the mine will increase by 1.2 Mt/y in the current 5 year plan (by 1985), and by 3.9 Mt/y in the next 5 year period. Reconstruction and development of the Angren mine will cost approximately 254 million rubles. Mining and earthmoving equipment which will be used in the Angren mine is reviewed: EhRGV-630 bucket wheel excavators, EhSh-10/70 and EhSh-13/50 walking draglines, etc.

  15. Round table on the Supply Chain for NPPs construction: Localization - Daya Bay Experience; REEL Handling and Lifting Systems, More than 60 years expertise in lifting and handling equipment in production process

    International Nuclear Information System (INIS)

    Frantz, Philippe; Lachaise, Marc; Lau, Steven

    2014-01-01

    The second day afternoon began with the round table on the Supply Chain for NPPs construction with Philippe Frantz, President of REEL, Marc Lachaise, Head of procurement of NNB at EDF Energy, and Steven Lau, First Deputy General Manager of DNMC. Philippe Frantz started to present the activities and the contribution of REEL in the construction of NPPs as a main supplier of handling system. Then, Marc Lachaise took the lead to present Hinkley Point C Project, the Values of NNB and the key role of the supply chain in this Project. Steven Lau went on to describe the link of the supply chain with the operating of NPPs and explained the cooperation between EDF and CGNPC in order to secure the supply of equipment. Following their presentation, they started the open discussion with the audience by explaining their strategy to make or to buy and the link of this strategy to their core business. They also highlighted the new relations and the new partnership between supplier and customer. They insisted on the necessity to invest on supply chain and to have a strong Nuclear Safety Culture in the supply chain

  16. Cost determination of the electro-mechanical equipment of a small hydro-power plant

    Energy Technology Data Exchange (ETDEWEB)

    Ogayar, B.; Vidal, P.G. [Grupo de Investigacion IDEA, Escuela Politecnica Superior, University of Jaen, Campus de Las Lagunillas, s/n. 23071-Jaen (Spain)

    2009-01-15

    One of the most important elements on the recovery of a small hydro-power plant is the electro-mechanical equipment (turbine-alternator), since the cost of the equipment means a high percentage of the total budget of the plant. The present paper intends to develop a series of equations which determine its cost from basic parameters such as power and net head. These calculations are focused at a level of previous study, so it will be necessary to carry out the engineering project and request a budget to companies specialized on the construction of electro-mechanical equipment to know its cost more accurately. Although there is a great diversity in the typology of turbines and alternators, data from manufacturers which cover all the considered range have been used. The above equations have been developed for the most common of turbines: Pelton, Francis, Kaplan and semiKaplan for a power range below 2 MW. The obtained equations have been validated with data from real installations which have been subject to analysis by engineering companies working on the assembly and design of small plants. (author)

  17. Financing of power supply systems and pollution control equipment. Models, dimensions, developments

    Energy Technology Data Exchange (ETDEWEB)

    Radtke, G; Raabe, G

    1988-11-01

    The authors explain the bankers' point of view of the financial and economic aspects of developments in the energy sector, discussing the financing of natural gas pipelines (Muro, Megal, etc.), of nuclear power plant construction, of projects in the oil supply sector, and of pollution abatement measures and equipment for the power industry and other industries. The different financial situations of small firms or large firms supplying pollution control equipment are discussed referring to the financing schemes to be set up, explaining among other things the profitability assessment taking into account long-term development or delays in return on capital investment from borrowed funds as induced, e.g., by delays in the licensing procedure. Future demand for borrowed capital for pollution control or nuclear power plant development is difficult to assess by the banking circles. (orig./RST).

  18. [Occupational injuries among construction workers in Hong Kong].

    Science.gov (United States)

    Huang, Zihui; Chen, Weiqing

    2002-02-01

    To explore the nature and severity of occupational injuries among construction workers and its risk factors in Hong Kong. One hundred and twenty-two injured construction workers in a public hospital and an equal number of workmate controls were studied. Contents included socio -demographic characteristics, the availability and use of safety equipment, smoking and alcohol consumption, etc. Abbreviated injury scale (AIS) and injury severity score (ISS) were employed for describing the nature, pattern and severity of injuries. Single injuries were seen in 80% of cases. Of 149 injuries classified by body region, 49% were external, 26% involved either the upper or lower extremities, and 11% were spinal injuries. Working at height was associated with the injury severity score. Safety hazards were identified in the work environment in 68% of the cases. Significant odds ratios for accidents were obtained for 'no formal education', 'non safety training' and 'current smokers'. The results implicated that construction was a hazardous occupation in Hong Kong. Improving the work environment and promoting safety education among construction workers would be helpful for minimizing or eliminating occupational injuries in construction occupation in Hong Kong.

  19. Studying Disabling Occupational Accidents in the Construction Industry During Two Years

    Directory of Open Access Journals (Sweden)

    Ahmad Soltanzadeh

    2014-06-01

    Full Text Available Background & Objectives : Idnetifying causes of occupational accidents is a key issue to prevent these accidents. The present study aimed to identify and analyze debilitating accidents in the construction industry during a two-year period ( 2010 - 2011 years . Methods: This was an analytical cross-sectional study. The study data included information about all debilitating accidents occurred within two years. Data collection was performed according to the accident report forms in construction sites. Data analysis was performed using SPSS software version 16. The level of significance was considered as P=0.05. Results: The mean age and job experience of injured people were 27.95±6.95 and 2.34±2.00 years, respectively. Most injuries to people were reported in hand (35.4%, legs (28.3% and back (20.4%. Most of accident types were respectively related to slipping and falling (26.1%, throwing objects (21.7%, falls (18.6%, abrasion (16.8% and clash (16.4%. Moreover, the main causes of accidents were related to lack of housekeeping (97.3%, lack of proper training (85.8%, lack of PPE (73.0%, unsafe acts (63.3%, unsafe conditions (32.3% and equipment (22.6%. Conclusion: Analyzing causes of disabling accidents in the construction industry showed that important factors in these accidents included lack of housekeeping, failure to provide proper training, lack of suitable PPE, unsafe acts, unsafe conditions and equipment for the construction jobs

  20. The method of using current regulations and standards in designing management and technologies of construction

    Directory of Open Access Journals (Sweden)

    Sinenko Sergey

    2017-01-01

    Full Text Available Economic efficiency of using funds in construction of buildings and structures begins from an effective, proper design, which is based on modern, cutting-edge, advanced equipment, streamlined organization and process solutions of construction operations. In the light of this it is considered application of “Self-Organization and Technology of Building” multifunctional software package capable of solving various engineering tasks on designing management of construction operations in accordance with the applicable rules and regulations in view of using software for automatic generation of workflow. Implementing this software in the construction management processes may help to solve management tasks at the construction site.

  1. Proceedings of the cold climate construction conference and expo

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2008-07-01

    This conference provided a forum to present innovative technologies in engineering, construction, energy efficiency, workforce productivity and several other aspects affecting cold regions. The session on winter construction featured tools techniques and technologies that maximize winter construction, with reference to the latest in cold weather construction techniques and lessons learned from the far north and south. It featured lessons on building on ice, frozen ground and permafrost. The session on sustainability addressed issues regarding sustainable design; solar, wind and geothermal systems; building envelopes that work in cold climates; and energy efficient products and techniques. The session on workforce productivity presented methods to keep the workforce warm and healthy in cold conditions; attracting and preparing foreign workers for the far north; worker productivity in a cold environment; tools, techniques and clothing to minimize the effects of cold weather; and cold weather equipment operations. Three presentations from the conference have been catalogued separately for inclusion in this database. refs., tabs., figs.

  2. 41 CFR 105-71.132 - Equipment.

    Science.gov (United States)

    2010-07-01

    .... (4) When acquiring replacement equipment, the grantee or subgrantee may use the equipment to be... managing equipment (including replacement equipment), whether acquired in whole or in part with grant funds... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Equipment. 105-71.132...

  3. The Design and Construction of the Advanced Mixed Waste Treatment Facility

    Energy Technology Data Exchange (ETDEWEB)

    Harrop, G.

    2003-02-27

    The Advanced Mixed Treatment Project (AMWTP) privatized contract was awarded to BNFL Inc. in December 1996 and construction of the main facility commenced in August 2000. The purpose of the advanced mixed waste treatment facility is to safely treat plutonium contaminated waste, currently stored in drums and boxes, for final disposal at the Waste Isolation Pilot Plant (WIPP). The plant is being built at the Idaho National Engineering and Environmental Laboratory. Construction was completed in 28 months, to satisfy the Settlement Agreement milestone of December 2002. Commissioning of the related retrieval and characterization facilities is currently underway. The first shipment of pre-characterized waste is scheduled for March 2003, with AMWTP characterized and certified waste shipments from June 2003. To accommodate these challenging delivery targets BNFL adopted a systematic and focused construction program that included the use of a temporary structure to allow winter working, proven design and engineering principles and international procurement policies to help achieve quality and schedule. The technology involved in achieving the AMWTP functional requirements is primarily based upon a BNFL established pedigree of plant and equipment; applied in a manner that suits the process and waste. This technology includes the use of remotely controlled floor mounted and overhead power manipulators, a high power shredder and a 2000-ton force supercompactor with the attendant glove box suite, interconnections and automated material handling. The characterization equipment includes real-time radiography (RTR) units, drum and box assay measurement systems, drum head space gas sampling / analysis and drum venting, drum coring and sampling capabilities. The project adopted a particularly stringent and intensive pre-installation testing philosophy to ensure that equipment would work safely and reliably at the required throughput. This testing included the complete off site

  4. The Design and Construction of the Advanced Mixed Waste Treatment Facility

    International Nuclear Information System (INIS)

    Harrop, G.

    2003-01-01

    The Advanced Mixed Treatment Project (AMWTP) privatized contract was awarded to BNFL Inc. in December 1996 and construction of the main facility commenced in August 2000. The purpose of the advanced mixed waste treatment facility is to safely treat plutonium contaminated waste, currently stored in drums and boxes, for final disposal at the Waste Isolation Pilot Plant (WIPP). The plant is being built at the Idaho National Engineering and Environmental Laboratory. Construction was completed in 28 months, to satisfy the Settlement Agreement milestone of December 2002. Commissioning of the related retrieval and characterization facilities is currently underway. The first shipment of pre-characterized waste is scheduled for March 2003, with AMWTP characterized and certified waste shipments from June 2003. To accommodate these challenging delivery targets BNFL adopted a systematic and focused construction program that included the use of a temporary structure to allow winter working, proven design and engineering principles and international procurement policies to help achieve quality and schedule. The technology involved in achieving the AMWTP functional requirements is primarily based upon a BNFL established pedigree of plant and equipment; applied in a manner that suits the process and waste. This technology includes the use of remotely controlled floor mounted and overhead power manipulators, a high power shredder and a 2000-ton force supercompactor with the attendant glove box suite, interconnections and automated material handling. The characterization equipment includes real-time radiography (RTR) units, drum and box assay measurement systems, drum head space gas sampling / analysis and drum venting, drum coring and sampling capabilities. The project adopted a particularly stringent and intensive pre-installation testing philosophy to ensure that equipment would work safely and reliably at the required throughput. This testing included the complete off site

  5. Expert system GIP-WWER for verification of seismic adequacy of WWER equipment

    International Nuclear Information System (INIS)

    Masopust, R.

    1999-01-01

    The aim of this report is to describe the modified Generic Implementation Procedure (GIP) titled GIP-WWER which can be used to verify seismic adequacy of the safe shutdown mechanical and electrical equipment and distribution systems of operating or constructed WWER NPPs, namely WWER-440/213 type. The WWER-GIP procedure was prepared using available information contained in GIP and the experience taken from various seismic inspections and evaluations of WWER type NPPs performed in the last five years

  6. Construction/Communication & Media. B5. CHOICE: Challenging Options in Career Education.

    Science.gov (United States)

    Putnam and Northern Westchester Counties Board of Cooperative Educational Services, Yorktown Heights, NY.

    The documents aggregated here comprise the fourth grade unit of a career education curriculum for migrant students. The unit focuses on the tools and tasks of workers in 11 jobs in the construction, communication, and media occupational clusters: heavy equipment operator, architect, mason, carpenter, plumber, electrician, telephone line worker,…

  7. 1968 Listing of Swimming Pool Equipment.

    Science.gov (United States)

    National Sanitation Foundation, Ann Arbor, MI. Testing Lab.

    An up-to-date listing of swimming pool equipment including--(1) companies authorized to display the National Sanitation Foundation seal of approval, (2) equipment listed as meeting NSF swimming pool equipment standards relating to diatomite type filters, (3) equipment listed as meeting NSF swimming pool equipment standard relating to sand type…

  8. The estimation of defects influence on lifetime of NPP equipment components

    International Nuclear Information System (INIS)

    Ovchinikov, A.V.; Vasilchenko, G.S.; Rivkin, E.Y.

    1998-01-01

    Estimating the influence of defects on NPP components lifetime requires several typical operations: testing the objects without destroying the means of control, scheme of detected defects and performing calculations. The basic methods for revealing defects are ultrasonic, radiographic and visual control. A technique was developed for lifetime calculation of reactor equipment with defects using minimum information about defects and properties of material. The experience obtained during several years has shown good results. Experimental data of tests concerning destruction of construction elements showed good reliability

  9. [Investigation report on the technical standards of TCM diagnosis, treatment and rehabilitation equipment].

    Science.gov (United States)

    Shen, Hua; Liu, Tangyi; Yang, Huayuan

    2016-02-01

    The questionnaire was adopted so as to investigate the attitudes and recognition of the manufacture eneprises of TCM diagnosis, treatment and rehabilitation equipment (DTRE) to the technical standards of, relevant products. It was found that the construction of the industrial standard and the national standard was lagged behind on TCM DTRE. Under the new situation, the enterprises are highly willing to participate in the development of the industrial, national and international standards and have a certain of understanding on the standard development. Nearly 80 % of enterprises believed that it was necessary to set up the relevant mirror organization for the development of industrial, national and international standard of TCM DITRE. In the future, the standard construction of TCM DTRE must face to the new situation. The constant increasing of the enterprises. and scientific research organizations in the standard construction must promote the development of TCM DTRE.

  10. Constructing a modern cytology laboratory: A toolkit for planning and design.

    Science.gov (United States)

    Roberson, Janie; Wrenn, Allison; Poole, John; Jaeger, Andrew; Eltoum, Isam A

    2013-01-01

    Constructing or renovating a laboratory can be both challenging and rewarding. UAB Cytology (UAB CY) recently undertook a project to relocate from a building constructed in 1928 to new space. UAB CY is part of an academic center that provides service to a large set of patients, support training of one cytotechnology program and one cytopathology fellowship training program and involve actively in research and scholarly activity. Our objectives were to provide a safe, aesthetically pleasing space and gain efficiencies through lean processes. The phases of any laboratory design project are Planning, Schematic Design (SD), Design Development (DD), Construction Documents (CD) and Construction. Lab personnel are most critical in the Planning phase. During this time stakeholders, relationships, budget, square footage and equipment were identified. Equipment lists, including what would be relocated, purchased new and projected for future growth ensure that utilities were matched to expected need. A chemical inventory was prepared and adequate storage space was planned. Regulatory and safety requirements were discussed. Tours and high level process flow diagrams helped architects and engineers understand the laboratory daily work. Future needs were addressed through a questionnaire which identified potential areas of growth and technological change. Throughout the project, decisions were driven by data from the planning phase. During the SD phase, objective information from the first phase was used by architects and planners to create a general floor plan. This was the basis of a series of meetings to brainstorm and suggest modifications. DD brings more detail to the plans with engineering, casework, equipment specifics, finishes. Design changes should be completed at this phase. The next phase, CD took the project from the lab purview into purely technical mode. Construction documents were used by the contractor for the bidding process and ultimately the Construction

  11. Problems of improving the investing process management in NPP construction

    International Nuclear Information System (INIS)

    Denisov, G.A.

    1986-01-01

    Problems of development of the optimal system for the investing process management in NPP construction are discussed. It includes 3 steps: design construction ( including building structure and equipment production ), and achievement of designed technical and economical indices, during reactor start-up. The method for estimating the interest of each participator of the intensing process and developing the optimal solution, that is capable to approach these interests, is suggested. The conclusion is made that it is necessary to develop and confirm the branch standard, which should include a complex amalgamated network of works to improve the organization of the investing process

  12. Crud separation from equipment drain of BWR atomic power station

    International Nuclear Information System (INIS)

    Hayashi, Masaru; Yamaguchi, Hisashi; Moriya, Yasuhiro; Koshiba, Yukihiko; Ota, Yoshiharu.

    1977-01-01

    In the primary cooling systems of BWR nuclear power stations, radioactive crud is generated and accumulates in reactors and circulating systems, which causes the radiation exposure of workers at the time of the inspection and maintenance of reactors. The chemical composition and grain size distribution of crud differ largely according to the construction of primary systems, the operational conditions of reactors, and the process of operation. The study on the application of nuclear pore membrane filter NPMF to the separation of crud in the waste water from equipment drain systems has been carried out. With the NPMF, clarified filtrate can be obtained without any filter aid, therefore the secondary waste of filter sludge is not generated. When the filter is clogged, the filtration capability can be regenerated by reverse flow washing, and continuous filtration is possible actually because the regeneration takes only short time. The NPMF is the polycarbonate membrane of about 10 μm thick, to which charged particles are irradiated vertically, and the flight tracks are etched with alkali solution, thus the required pore treatment is applied. The basic investigation of waste liquid, the endurance test of actual filters, the filtration test with the pilot apparatus, the demonstration test with an actual equipment, and the design of the actual equipment have been carried out for three years. (Kako, I.)

  13. Comprehensive analysis and evaluation of big data for main transformer equipment based on PCA and Apriority

    Science.gov (United States)

    Guo, Lijuan; Yan, Haijun; Hao, Yongqi; Chen, Yun

    2018-01-01

    With the power supply level of urban power grid toward high reliability development, it is necessary to adopt appropriate methods for comprehensive evaluation of existing equipment. Considering the wide and multi-dimensional power system data, the method of large data mining is used to explore the potential law and value of power system equipment. Based on the monitoring data of main transformer and the records of defects and faults, this paper integrates the data of power grid equipment environment. Apriori is used as an association identification algorithm to extract the frequent correlation factors of the main transformer, and the potential dependence of the big data is analyzed by the support and confidence. Then, the integrated data is analyzed by PCA, and the integrated quantitative scoring model is constructed. It is proved to be effective by using the test set to validate the evaluation algorithm and scheme. This paper provides a new idea for data fusion of smart grid, and provides a reference for further evaluation of big data of power grid equipment.

  14. Participation of SKODA JS in the construction of the Temelin and Mochovce nuclear power plants

    International Nuclear Information System (INIS)

    Svec, A.; Zach, J.; Ruzicka, P.

    2000-01-01

    SKODA JS is the traditional manufacturer of WWER type reactor equipment and also supplier of the primary circuits and of equipment for the transport, refuelling and storage of fuel for Ver type nuclear power plants built in the Czech and Slovak Republics. The paper deals with activities of the company SKODA JS at two power plants whose reactor units are close to completion, viz. the Mochovce NPP in the Slovak Republic (4 x Ver 440 MW; unit 1 was put in operation in 1998, unit 2 is in the stage of commissioning, units 3 and 4 are not to be completed) and the Temelin NPP in the Czech Republic (2 x Ver 1000 MW, commissioning of units 1 and 2 is expected in 2001 and 2002, respectively). The scope of supplies to the two nuclear power plants (detailed design, delivery of equipment, installation, commissioning) and the course of construction from SKODA JS's viewpoint are described. The most important design changes and improvements made during the construction are highlighted. (author)

  15. 29 CFR 1926.952 - Mechanical equipment.

    Science.gov (United States)

    2010-07-01

    ... equipment that are not covered with insulating protective equipment. (c) Derrick trucks, cranes and other lifting equipment. (1) All derrick trucks, cranes and other lifting equipment shall comply with subpart N...

  16. Development and performance of inspection equipment for pressure tubes in Fugen

    International Nuclear Information System (INIS)

    Naruo, Kazuteru; Tanimoto, Ken-ichi; Ohta, Takeo; Nakamura, Takahisa; Imaizumi, Kiyoshi.

    1984-01-01

    The pressure tubes of Fugen are the important equipment as the many tubes compose the core, and since they are made of Zr-2.5% Nb alloy which has been used for the first time in Japan, they have become the object of monitoring (the follow-up investigation of the change of inside diameter, the presence of defects and so on) in addition to the in-service inspection. In this paper, on the inspection equipment for pressure tubes, that has been developed independently by the Power Reactor and Nuclear Fuel Development Corp. in order to carry out the ISI and monitoring, the course of development and the construction and the performance are reported, and the results of having used it for the fourth regular inspection of Fugen are described. The 10-year plan of the ISI and monitoring of pressure tubes is shown. The core of Fugen is composed of 224 pressure tubes, therefore, the inspection is carried out by sampling inspection. The monitoring is carried out on four tubes for the follow-up investigation and one tube that shows the severest operation history at the time of inspection. The equipment performs ultrasonic flaw detection, the measurement of inside diameter and the visual inspection of internal surface. (Kako, I.)

  17. Equipment Operational Requirements

    Energy Technology Data Exchange (ETDEWEB)

    Greenwalt, B; Henderer, B; Hibbard, W; Mercer, M

    2009-06-11

    The Iraq Department of Border Enforcement is rich in personnel, but poor in equipment. An effective border control system must include detection, discrimination, decision, tracking and interdiction, capture, identification, and disposition. An equipment solution that addresses only a part of this will not succeed, likewise equipment by itself is not the answer without considering the personnel and how they would employ the equipment. The solution should take advantage of the existing in-place system and address all of the critical functions. The solutions are envisioned as being implemented in a phased manner, where Solution 1 is followed by Solution 2 and eventually by Solution 3. This allows adequate time for training and gaining operational experience for successively more complex equipment. Detailed descriptions of the components follow the solution descriptions. Solution 1 - This solution is based on changes to CONOPs, and does not have a technology component. It consists of observers at the forts and annexes, forward patrols along the swamp edge, in depth patrols approximately 10 kilometers inland from the swamp, and checkpoints on major roads. Solution 2 - This solution adds a ground sensor array to the Solution 1 system. Solution 3 - This solution is based around installing a radar/video camera system on each fort. It employs the CONOPS from Solution 1, but uses minimal ground sensors deployed only in areas with poor radar/video camera coverage (such as canals and streams shielded by vegetation), or by roads covered by radar but outside the range of the radar associated cameras. This document provides broad operational requirements for major equipment components along with sufficient operational details to allow the technical community to identify potential hardware candidates. Continuing analysis will develop quantities required and more detailed tactics, techniques, and procedures.

  18. Measurement of the electrostatic charge in airborne particles: I - development of the equipment and preliminary results

    Directory of Open Access Journals (Sweden)

    Marra Jr. W.D.

    2000-01-01

    Full Text Available The design and construction of a equipment capable of measuring the electrostatic charges in aerosols, named the electrostatic charge classifier, were carried out. They were based on the concept of particle electromobility and the charge classifier was intended to classify the nature and the distribution of electrostatic charges as a function of particle size. The resulting piece of equipment is easy to dismount, which facilitates its cleaning and transport, and easy to operate. Early results indicate that the values of electrostatic charge measured on test particles are inside the range reported in the literature, indicating the adequacy of the technique utilized.

  19. Construction of the advanced boiling water reactor in Japan

    International Nuclear Information System (INIS)

    Natsume, Nobuo; Noda, Hiroshi

    1996-01-01

    The Advanced Boiling Reactor (ABWR) has been developed with international cooperation between Japan and the US as the generation of plants for the 1990s and beyond. It incorporates the best BWR technologies from the world in challengeable pursuit of improved safety and reliability, reduced construction and operating cost, reduced radiation exposure and radioactive waste. Tokyo Electric Power Company (MPCO) decided to apply the first ABWRs to unit No. 6 and 7 of Kashiwazaki-Kariwa nuclear power station (K-6 and 7). These units are scheduled to commence commercial operation in December 1996 and July 1997 respectively. Particular attention is given in this discussion to the construction period from rock inspection for the reactor building to commercial operation, which is to be achieved in only 52 months through innovative and challenging construction methods. To date, construction work is advancing ahead of the original schedule. This paper describes not only how to shorten the construction period by adoption of a variety of new technologies, such as all-weather construction method and large block module construction method, but also how to check and test the state of the art technologies during manufacturing and installation of new equipment for K-6 and 7

  20. Characterization equipment essential drawing plan

    International Nuclear Information System (INIS)

    WILSON, G.W.

    1999-01-01

    The purpose of this document is to list the Characterization equipment drawings that are classified as Essential Drawings. Essential Drawings: Are those drawings identified by the facility staff as necessary to directly support the safe operation of the facility or equipment (HNF 1997a). The Characterization equipment drawings identified in this report are deemed essential drawings as defined in HNF-PRO-242, Engineering Drawing Requirements (HNF 1997a). These drawings will be prepared, revised, and maintained per HNF-PRO-440, Engineering Document Change Control (HNF 1997b). All other Characterization equipment drawings not identified in this document will be considered Support drawings until the Characterization Equipment Drawing Evaluation Report is completed

  1. Attitude stabilization of a spacecraft equipped with large electrostatic protection screens

    Science.gov (United States)

    Nikitin, D. Yu.; Tikhonov, A. A.

    2018-05-01

    A satellite with a system of three electrostatic radiation protection (ERP) screens is under consideration. The screens are constructed as electrostatically charged toroidal shields with characteristic size of order equal to 100 m. The interaction of electric charge with the Earth's magnetic field (EMF) give rise to the Lorentz torque acting upon a satellite attitude motion. As the sizes of ERP system are large, we derive the Lorentz torque taking into account the complex form of ERP screens and gradient of the EMF in the screen volume. It is assumed that the satellite center of charge coincides with the satellite mass center. The EMF is modeled by the straight magnetic dipole. In the paper we investigate the usage of Lorentz torque for passive attitude stabilization for satellite in a circular equatorial orbit. Mathematical model for attitude dynamics of a satellite equipped with ERP interacting with the EMF is derived and first integral of corresponding differential equations is constructed. The straight equilibrium position of the satellite in the orbital frame is found. Sufficient conditions for stability of satellite equilibrium position are constructed with the use of the first integral. The gravity gradient torque is taken into account. The satellite equilibrium stability domain is constructed.

  2. ADVANCING THE PROCESSING TECHNOLOGIES OF THE DETAILS OF CONSTRUCTION MACHINERY AND EQUIPMENT

    Directory of Open Access Journals (Sweden)

    Burlachenko Oleg Vasil’evich

    2016-03-01

    Full Text Available On the contemporary stage on the development and advancement of processing technologies of machine and equipment details it is necessary to find a complex solution to the problem of their performance characteristics. This solution supposes the development of specific methods providing and advancing some specific index of performance efficiency (often regardless of real coupling state and the creation and implementation of the technologies having complex physical and technical impacts on the contact combination. The novelty of processing methods is determined by all the components of the technological system, each of which has its own novelty or creates the novelty of the system as a whole due to definite non-traditional combination of the known components. The system of improving the existing and creating new methods and technological processes of manufacturing the products is considered. The mechanical, physical and chemical effects on the work surface in case of specific kinematics of tool path and the workpieces during operation, and also the wear of engine cylinders are analyzed. The authors offer a technology of obtaining nonporous hot-stamped powder alloys with higher strength properties of the outer surface and high plastic properties of core. The unity of the processes of power, temperature and other effects on the working surface of details during their manufacture and operation is established.

  3. Proceedings of the European Symposium on Pressure Equipment - ESOPE 2007

    International Nuclear Information System (INIS)

    2007-01-01

    Every three years, and since thirty years, the AFIAP organizes a symposium where the experts and actors working in the field of pressure equipments, whether fixed or transportable, can meet and exchange on all developments related to their activity. What was at first called the 'National Congress on the technology of pressure components', and later the 'Study Days on pressure components', became since 2001 the 'European Symposium on Pressure Equipment' (ESOPE), so marking an opening to the European and International fields in a context marked by the application of the European Directives applicable to these equipments. The 2001 symposium was more particularly dedicated to the application of the directives harmonizing the construction of equipments, and the 2004 symposium was more particularly centred on the management of equipments in operation. For the ESOPE 2007 Symposium, the organizing committee wished to resume these two subjects under the aspects of the safety, the competitiveness, as well as the innovation. The plenary session of the last day will be completely dedicated to these subjects and will include a Panel discussion, where National and European authorities, representatives of manufacturers and users, as well as experts engaged in developments and new projects will express their views. These exchanges will also permit to answer the questions expressed by the participants. Every symposium has thus a main orientation, but shall also be the place of exchanges on the different subjects wished by the profession. The traditional technical sessions are consequently maintained: - Sessions on Design and Materials, - Sessions on Fabrication, - Sessions on Fitness for Service, and a special session dedicated to the National, European and International Codes is added, the afternoon of the first day. The plenary Opening session is also devoted to this last subject with lectures on the evolutions of European regulations, the orientations retained for pressure

  4. Energy to the Edge (E2E) Equipment Assessment U.S. Army Rapid Equipping Force

    Science.gov (United States)

    2015-05-01

    84 Contents Energy to the Edge • U.S. Army Rapid Equipping Force U.S. Army Rapid Equipping Force 1.0 Executive Summary Executive Summary U.S. Army... audiovisual equipment. • Once radiant barrier liner is inserted, the process of subsequent setups • Cables for lighting and outlets are located...behind the internal barrier • The shelter comes with organic audiovisual equipment. b. • • This shelter has a different setup and tear down process

  5. Upgraded Features of Newly Constructed Fuel Assembly Mechanical Characterization Test Facility in KAERI

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Kang Hee; Kang, Heung Seok; Yoon, Kyung Ho; Kim, Hyung Kyu; Lee, Young Ho; Kim, Soo Ho; Yang, Jae Ho [KAERI, Daejeon (Korea, Republic of)

    2016-05-15

    Fuel assembly mechanical characterization test facility (FAMeCT) in KAERI is newly constructed with upgraded functional features such as increased loading capacity, under-water vibration testing and severe earthquake simulation for extended fuel design guideline. The facility building is compactly designed in the scale of 3rd floor building and has regions for assembly-wise mechanical test equipment, dynamic load (seismic) simulating test system, small scale hydraulic loop and component wise test equipment. Figure 1 shows schematic regional layout of the facility building. Mechanical test platform and system is designed to increase loading capacity for axial compression test. Structural stability of the support system of new upper core plate simulator is validated through a limit case functional test. Fuel assembly mechanical characterization test facility in KAERI is newly constructed and upgraded with advanced functional features such as uprated loading capacity, under-water vibration testing and severe earthquake simulation for extended fuel design guideline. This paper briefly introduce the test facility construction and scope of the facility and is focused on the upgraded design features of the facility. Authors hope to facilitate the facility more in the future and collaborate with the industry.

  6. Information technology equipment cooling method

    Science.gov (United States)

    Schultz, Mark D.

    2015-10-20

    According to one embodiment, a system for removing heat from a rack of information technology equipment may include a sidecar indoor air to liquid heat exchanger that cools air utilized by the rack of information technology equipment to cool the rack of information technology equipment. The system may also include a liquid to liquid heat exchanger and an outdoor heat exchanger. The system may further include configurable pathways to connect and control fluid flow through the sidecar heat exchanger, the liquid to liquid heat exchanger, the rack of information technology equipment, and the outdoor heat exchanger based upon ambient temperature and/or ambient humidity to remove heat generated by the rack of information technology equipment.

  7. Equipment abnormality monitoring device

    International Nuclear Information System (INIS)

    Ando, Yasumasa

    1991-01-01

    When an operator hears sounds in a plantsite, the operator compares normal sounds of equipment which he previously heard and remembered with sounds he actually hears, to judge if they are normal or abnormal. According to the method, there is a worry that abnormal conditions can not be appropriately judged in a case where the number of objective equipments is increased and in a case that the sounds are changed gradually slightly. Then, the device of the present invention comprises a plurality of monitors for monitoring the operation sound of equipments, a recording/reproducing device for recording and reproducing the signals, a selection device for selecting the reproducing signals among the recorded signals, an acoustic device for converting the signals to sounds, a switching device for switching the signals to be transmitted to the acoustic device between to signals of the monitor and the recording/reproducing signals. The abnormality of the equipments can be determined easily by comparing the sounds representing the operation conditions of equipments for controlling the plant operation and the sounds recorded in their normal conditions. (N.H.)

  8. 40 CFR 31.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Equipment. 31.32 Section 31.32...

  9. 14 CFR 1273.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Equipment. 1273.32 Section 1273.32...

  10. 29 CFR 1470.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 29 Labor 4 2010-07-01 2010-07-01 false Equipment. 1470.32 Section 1470.32 Labor Regulations...

  11. 38 CFR 43.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 38 Pensions, Bonuses, and Veterans' Relief 2 2010-07-01 2010-07-01 false Equipment. 43.32 Section...

  12. The Northern regional programme for the acceptance testing of X-ray equipment

    International Nuclear Information System (INIS)

    Faulkner, K.; Harrison, R.M.; Kotre, C.J.; Smith, S.; Davies, M.; Barker, P.

    1989-01-01

    Since 1984 the UK Northern Regional Medical Physics Department has participated in a regional acceptance testing programme for all X-ray equipment from mobile units to computed tomography scanners. Organizational and radiation physics aspects of the programme are described. Three levels of tests are performed by physicists: the first on installation, the second after 3 months, the final visit just prior to the end of the manufacturers warranty. The second test is only performed if any aspect of performance requires rechecking as a result of the first. Acceptance test protocols are based on those published by the Institute of Physical Sciences in Medicine. Details limiting values for the acceptance test measurements are given. In some instances testing has resulted in modifications to the design and construction of X-ray equipment. Acceptance testing is important in determining a baseline standard of performance against which routine quality assurance may be assessed. (author)

  13. Making petroleum equipment safe, a priority

    International Nuclear Information System (INIS)

    1999-01-01

    Changes to the 'Act respecting the use of petroleum products' have been announced effective May 1, 1999. The changes have been made to reduce problems which can be attributed to petroleum product leaks. The new regulations will make owners and users of petroleum equipment, including underground and above-ground storage equipment and commercial storage tanks, more accountable for the use of their own equipment. The emphasis in the new regulations is based upon the storage capacity of petroleum equipment and the risks associated with this equipment, rather than the on the activities of the owners concerned. Accordingly, the new regulations call for stricter requirements for high-risk equipment, a private equipment inspection plan, a two-year operating permit, replacing the current permits and certificates, a tariff structure based on the risks associated with the equipment, and deregulation of commercial activities involving petroleum products that require no equipment. Additionally, the amendments to the Act transfer responsibility for administration to the Regie du batiment and to the Ministere des Transports. Details of each of these changes are explained

  14. Innovative Organization of Project Activity of Construction Students

    Science.gov (United States)

    Stolbova, I. D.; Aleksandrova, E. P.; Krainova, M. N.

    2017-11-01

    The construction industry competitiveness depends on its equipping with information modeling technologies. This requires training and development of human resources. The advantages of BIM-technologies are considered. The requirements for the specialists capable of promoting information modeling technologies in the construction industry are discussed. For a wide application of BIM-technologies, the problem of training personnel with a new thinking must be solved. When preparing graduates of the major “Construction”, it is necessary to introduce innovative educational technologies aimed at building the students’ ability for team work, competences in the field of modern information and communication technologies, as well as design skills basing on spatial modeling. Graphic training is the first discipline of the professional orientation for construction students. In the context of training it is important to create such learning environment that is close to a professional one. The paper provides the examples of practice-oriented assignments based on the project method in the course of students’ independent work.

  15. Trevino Project: a fast-track approach for a small construction project

    International Nuclear Information System (INIS)

    Schick, C.J.; Lynn, N.S.

    1982-01-01

    The approach to a construction project can vary according to the size, location, and degree of difficulty associated with the project. This paper deals with one approach that can be taken to a small construction project, the fast-track approach. A small construction project can be defined as a project having less than $20 million capital cost or a project with a low degree of difficulty. This approach is very applicable to in-situ leaching uranium projects, small precious metal operations, etc. The approach to the small project is that of fast-tracking the project in order to minimize the time over which capital expenditure occurs and also to reduce the indirect costs of field expense, construction supplies, construction equipment, etc. In order to fast-track a project it is necessary to do a very precise job on the preliminary phases of the project such as preliminary engineering, plant site location, environmental permits, etc. 2 figures, 2 tables

  16. Portfolio Purchasing Decision for Mobile Power Equipment of B2C E-Commerce Export Retailer Based on CVaR

    Science.gov (United States)

    Yanchun, Wan; Qiucen, Chen

    2017-11-01

    Purchasing is an important part of export e-commerce of B2C, which plays an important role on risk and cost control in supply management. From the perspective of risk control, the paper construct a CVaR model for portfolio purchase. We select a heavy sales mobile power equipment from a typical B2C e-commerce export retailer as study sample. This study optimizes the purchasing strategy of this type of mobile power equipment. The research has some reference for similar enterprises in purchasing portfolio decision.

  17. 13 CFR 143.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Equipment. 143.32 Section 143.32...

  18. 32 CFR 33.32 - Equipment.

    Science.gov (United States)

    2010-07-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 32 National Defense 1 2010-07-01 2010-07-01 false Equipment. 33.32 Section 33.32 National Defense...

  19. 45 CFR 92.32 - Equipment.

    Science.gov (United States)

    2010-10-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 45 Public Welfare 1 2010-10-01 2010-10-01 false Equipment. 92.32 Section 92.32 Public Welfare...

  20. 15 CFR 24.32 - Equipment.

    Science.gov (United States)

    2010-01-01

    ... awarding agency. (d) Management requirements. Procedures for managing equipment (including replacement... return. (e) Disposition. When original or replacement equipment acquired under a grant or subgrant is no... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Equipment. 24.32 Section 24.32...

  1. Seismic qualification of non-safety class equipment whose failure would damage safety class equipment

    International Nuclear Information System (INIS)

    LaSalle, F.R.

    1991-01-01

    Both Code of Federal Regulations, Title 10, Part 50, and US Department of Energy Order 6340.1A have requirements to assess the interaction of non-safety and safety class structures and equipment during a seismic event to maintain the safety function. At the Hanford Site, a cost effective program has been developed to perform the evaluation of non-safety class equipment. Seismic qualification is performed by analysis, test, or upgrading of the equipment to ensure the integrity of safety class structures and equipment. This paper gives a brief overview and synopsis that address design analysis guidelines including applied loading, damping values, component anchorage, allowable loads, and stresses. Test qualification of equipment and walkdown acceptance criteria for heating ampersand ventilation (H ampersand V) ducting, conduit, cable tray, missile zone of influence, as well as energy criteria are presented

  2. Days individual equipment of protection and professional risks; Equipements de protection individuelle et risques professionnelles

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2007-07-01

    The personal protection equipment is studied in the legal way (legal liabilities, certification, European texts), technical way (ergonomics, painfulness of ventilated equipment wearing, reliability of a respirable air line, protection gloves against the chemical risk, exposure to nano particulates, working in hot area), human factors (hostile area and emotion management), studies on personal equipment such evaluation, efficiency, conception of new equipment, physiological tolerance, limit of use, and some general safety studies on the working places. (N.C.)

  3. An investigation and analysis of safety issues in Polish small construction plants.

    Science.gov (United States)

    Dąbrowski, Andrzej

    2015-01-01

    The construction industry is a booming sector of the Polish economy; however, it is stigmatised by a lower classification due to high occupational risks and an unsatisfactory state of occupational safety. Safety on construction sites is compromised by small construction firms which dominate the market and have high accident rates. This article presents the results of studies (using a checklist) conducted in small Polish construction companies in terms of selected aspects of safety, such as co-operation with the general contractor, occupational health and safety documents, occupational risk assessment, organization of work, protective gear and general work equipment. The mentioned studies and analyses provided the grounds to establish the main directions of preventive measures decreasing occupational risk in small construction companies, e.g., an increase in engagement of investors and general contractors, improvement of occupational health and safety (OSH) documents, an increase in efficiency of construction site managers, better stability of employment and removal of opposing objectives between economic strategy and work safety.

  4. Equipment standards for interventional cardiology

    International Nuclear Information System (INIS)

    Dowling, A.; Gallagher, A.; Walsh, C.; Malone, J.

    2005-01-01

    Interventional radiology has seen rapid growth in cardiology and represents an alternative to hazardous surgery. Recently there has been a substantial growth in the number of procedures being performed and interventional cardiology (IC) procedures are the most common interventional procedures in Europe. Advances in imaging technology have facilitated the development of increasingly complex radiological IC equipment. Currently, the technology is developing at a rate ahead of supporting research, equipment standards and a regulatory framework. International standards play a key role in the design, manufacture and performance of radiological IC equipment. A survey of 12 IC systems (15 imaging chains) was conducted in Irish hospitals. The aim of the study was to assess the imbalance between rapidly advancing technology and existing standards and to propose recommendations for new IC equipment standards. The results demonstrate the need for definitive equipment requirements and standardisation in the design, manufacture, acceptance and maintenance of IC equipment. (authors)

  5. Mathematical model for optimization of multilayer submerged-arc welding of frame equipment of power units

    International Nuclear Information System (INIS)

    Pankov, V.V.; Chernyshev, G.G.; Kozlov, N.E.

    1987-01-01

    A mathematical model for optimization of multilayer submerged arc welding of frame equipment of power units is constructed. The variation-energy method permits to construct the universal mathematical model for strengthening formation of a single bead; the method is reasonable for simulation of a multilayer welded joint. Minimization of the distance between maximum and minimum layer height of a built-up metal is the necessary condition for qualitative formation of the multilayer joint. One can calculate in real time scale the optimal vector of maximally ten parameters under the multilayer welding condition immediately after change in the grooving width using the developed mathematical model of optimization

  6. Strategic project selection based on evidential reasoning approach for high-end equipment manufacturing industry

    Directory of Open Access Journals (Sweden)

    Lu Guangyan

    2017-01-01

    Full Text Available With the rapid development of science and technology, emerging information technologies have significantly changed the daily life of people. In such context, strategic project selection for high-end equipment manufacturing industries faces more and more complexities and uncertainties with the consideration of several complex criteria. For example, a group of experts rather than a single expert should be invited to select strategic project for high-end equipment manufacturing industries and the experts may feel difficulty to express their preferences towards different strategic projects due to their limited cognitive capabilities. In order to handle these complexities and uncertainties, the criteria framework of strategic project selection is firstly constructed based on the characteristics of high-end equipment manufacturing industries and then evidential reasoning (ER approach is introduced in this paper to help experts express their uncertain preferences and aggregate these preferences to generate an appropriate strategic project. A real case of strategic project selection in a high-speed train manufacturing enterprise is investigated to demonstrate the validity of the ER approach in solving strategic project selection problem.

  7. A Study on Nonconformance and Construction Method Improvement for Nuclear Power Plant

    International Nuclear Information System (INIS)

    Kim, Jong Yeob; Roh, Myung Sub

    2014-01-01

    Advanced power reactor was developed by domestic technology, and finally exported to abroad. In order to place the current nuclear power industrial base, construction has played a big role. Without magnificent construction technology, it would have been impossible to get a safe nuclear power plant on time and in budget. Construction industry occupies very large portion of the economy in South Korea and it has been a core of South Korea's economic growth. With a competitive construction industry and advanced nuclear power plant construction know-how, South Korea could provide safe and reliable nuclear power plants in domestic and world. However there are many repairs and number of corrective actions are in actual construction. Thus, this paper suggested the result of nonconformance and construction method improvement for nuclear power plant. Constructional engineering is a kind of science that has a variety of disciplines including structure, geology, mechanical equipment and other fields. Thus, the development of constructional engineering is closely associated with experience from failure and application advanced construction method. The recent experience in nuclear power plants construction has shown that those improved methods are fully applicable and can help shorten the construction schedule. The future of nuclear power plant construction seems to be more encouraged, even though it has many obstacles

  8. Fatal occupational injuries in the Malaysian construction sector–causes and accidental agents

    Science.gov (United States)

    Ayob, A.; Shaari, A. A.; Zaki, M. F. M.; Munaaim, M. A. C.

    2018-04-01

    The construction sector is associated with various accidents and fatal injuries. These occupational accidents are caused by numerous factors, such as lack of supervision; lack of adherence to safe work technique; failure to wear personal protective equipment; and failure to comply with the safe use of tools, vehicles, and machines. Using 2013–2016 secondary data from the Department of Occupational Safety and Health and Social Security Organization, this study conducted a descriptive exploration survey to identify common fatal occupational injuries associated with the Malaysian construction sector, as well as their causes and accidental agents. Results indicated that construction, followed by manufacturing, agriculture, forestry, logging, and fishery, are the riskiest job sectors in Malaysia. The highest incidences of occupational casualties were reported in Sarawak, Johor, and Selangor. These states accounted for approximately 13.33% to 18.18% of all cases of fatal occupational accidents. In these states, the lack of safety and health regulations and poor execution of risk management increased the risk of occupational accidents. Falls from heights accounted for 46.28% of fatal occupational injuries. Furthermore, being crushed by objects, materials, or vehicles accounted for 9.09% to 17.36% of fatal occupational injuries. Substandard work environment and transportation and lifting equipment, such as scaffolds, are primary accidental agents. Results of this study could enhance the knowledge and awareness of construction workers and management of job-related injuries to decrease the incidence of fatal occupational accidents.

  9. Shipboard and laboratory equipment

    Digital Repository Service at National Institute of Oceanography (India)

    Shyamprasad, M.; Ramaswamy, V.

    The polymetallic nodules occur at an average depth of 4500 m. Adequate equipment and techniques are required for the exploration at such depths. Shipboard and various laboratory equipments for the sampling of polymetallic nodules is described...

  10. 40 CFR 792.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 31 2010-07-01 2010-07-01 true Equipment design. 792.61 Section 792.61...) GOOD LABORATORY PRACTICE STANDARDS Equipment § 792.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  11. 40 CFR 160.61 - Equipment design.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 23 2010-07-01 2010-07-01 false Equipment design. 160.61 Section 160... LABORATORY PRACTICE STANDARDS Equipment § 160.61 Equipment design. Equipment used in the generation... appropriate design and adequate capacity to function according to the protocol and shall be suitably located...

  12. Equipment installation structure of roof slab for tank type FBR and method of equipment installation

    International Nuclear Information System (INIS)

    Sakai, Takao; Yamakawa, Masanori; Otsuka, Masaya; Sekine, Katsuhisa

    1986-01-01

    Purpose: To reduce equipment thermal stress and deformation by eliminating uneven temperature distribution caused at the equipment through section of the roof slab for the tank FBR, and at the same time, simplify the structure installation. Method: Multiple number of vertical fin projects are fit on the equipment through-section inside wall for the roof slab and the cylindrical equipment peripheral wall, and with these projected fins, the ring space of the through section is vertically divided into multiple sections in the circumferential direction. The vertical fins on the through-section inside wall and the fins on the equipment peripheral wall are contacted with each other by revolving them in the lateral direction. As a result, the natural convection caused by the difference of temperatures in the vertical direction of the ring space becomes a convection within each sector divided, and never generates circumferential circulation, which reduce uneven temperature distribution caused at the equipment through section. (Kawakami, Y.)

  13. Preplaced aggregate concrete application on Fort St. Vrain PCRV construction

    International Nuclear Information System (INIS)

    Ople, F.S. Jr.

    1976-01-01

    Two distinct concreting methods were employed in the construction of the prestressed concrete reactor vessel (PCRV) of the Fort St. Vrain (FSV) Nuclear Generating Station, a 330 MW(e) High Temperature Gas-Cooled Reactor installation near Denver, Colorado. Preplaced aggregate concrete (PAC) techniques were employed in the PCRV bottom head and the core support floor; conventional job-mixed concrete was used in the PCRV sidewall and top head regions. This paper describes the successful application of PAC techniques utilized primarily in solving construction difficulties associated with confined and heavily congested regions of the PCRV. The PAC technique consists of placing coarse aggregate inside the forms, followed by injection of grout under pressure through embedded pipes to fill the interstices in the aggregate mass. Details of the PAC construction method including grout mix development, grouting equipment, grout pipe layout, grouting sequence, grout level monitoring, concrete temperature control, and pre-construction mockups are described. (author)

  14. Management methodology for pressure equipment

    Science.gov (United States)

    Bletchly, P. J.

    Pressure equipment constitutes a significant investment in capital and a major proportion of potential high-risk plant in many operations and this is particularly so in an alumina refinery. In many jurisdictions pressure equipment is also subject to statutory regulation that imposes obligations on Owners of the equipment with respect to workplace safety. Most modern technical standards and industry codes of practice employ a risk-based approach to support better decision making with respect to pressure equipment. For a management system to be effective it must demonstrate that risk is being managed within acceptable limits.

  15. AP1000 design and construction integration

    International Nuclear Information System (INIS)

    Winters, James W.; Clelland, Jill A.

    2004-01-01

    Construction costs of commercial nuclear generating plants must be reduced in order to expand the future use of nuclear energy. Two of the drivers of plant construction costs are the cost of financing during the construction duration and the substantial amount of skilled craft labor hours needed on site during construction. The application of information technology (IT) has been used to understand and reduce both of these drivers by establishing parallel construction paths using modules and integrating construction sequence review into the design process. In a program sponsored by EPRI, Westinghouse has modeled the construction of AP1000 in '4D' to show its viability, to improve its logic, to improve the plant design for constructibility and overall to reduce time and risk in the construction schedule. The design of most of AP1000 was constrained to be a duplicate of AP600 except where components required expansion for the higher power level. As a result, the construction schedule for AP1000 is as mature and as robust as that for AP600. Two areas important to the construction of AP1000 did require some design work because they could not remain the same as AP1000. First, the turbine building had to be redesigned to accommodate the larger turbine and its support systems. Again, as much of the AP600 design and philosophy as possible was retained. The building required enlargement and the basemat, foundations, steel structure and structural modules required modification. As concrete, steel, and equipment were defined by the designers, they were matched to the original AP600 turbine building schedule. This forced designers to assemble files to be consistent with building assembly activities and to think about constructibility as they defined the final design. Second, the reinforcement structure within the concrete under and supporting the containment vessel required detail design. Westinghouse was fortunate to have the constructor Obayashi of Japan recommend a detailed

  16. 21 CFR 58.61 - Equipment design.

    Science.gov (United States)

    2010-04-01

    ... 21 Food and Drugs 1 2010-04-01 2010-04-01 false Equipment design. 58.61 Section 58.61 Food and... PRACTICE FOR NONCLINICAL LABORATORY STUDIES Equipment § 58.61 Equipment design. Equipment used in the... of appropriate design and adequate capacity to function according to the protocol and shall be...

  17. Development of microstructure to optimise mechanical performance of power generation equipment

    International Nuclear Information System (INIS)

    Marshall, P.

    1986-11-01

    The factors responsible for the development of microstructure in CEGB construction ceramics and steels is assessed as a function of composition, thermomechanical treatment, thermal ageing and environmental degradation. The relationships between microstructure and mechanical properties (tensile, toughness, creep and fatigue) of relevance to structures operating in power generation equipment is then developed in quantitative terms. The conclusions from the assessment are as follows: 1 The relationship between microstructure and mechanical properties of construction ceramics and steels used in the power generation industry has been assessed. 2 Factors which significantly influence microstructure and thus mechanical properties are chemical composition, thermomechanical treatment, ageing and environmental degradation. The influence of such microstructural changes in tensile, toughness, fatigue and creep properties of ceramics and steels is assessed. 3 The benefits arising from an understanding of materials behaviour are discussed in terms of improved materials and the assessment of plant performance. (author)

  18. SAFETY PERFORMANCE OF SUBCONTRACTORS IN THE PALESTINIAN CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Adnan Enshassi

    2008-06-01

    Full Text Available Subcontractors perform most of the construction works and their effect on industry are apparent in different activities of construction. Therefore, subcontractors need more attention from government and contractors union. The aim of this paper is to identify, evaluate, and rank factors that influence safety performance of subcontractors in the Gaza Strip (Palestine according to their relative importance. The study concluded that reported accident rates will decrease among subcontractors and their workers if new workers are trained well in the work site and they are informed about dangerous places, and if a workable safety plan is well preplanned. The results also showed that reported accident rates increased among subcontractors when using old, unsafe equipment and due to the complexity or difficulty in the construction sites features. Owners and general contractors need to stipulate strict clauses for safety in the contract for improving safety record of subcontractors. Construction workers must receive proper job related safety and health training with a safety logbook. It is recommended that the subcontractors and workers should attend continuing safety programs on regular basis as part of their perquisite to work in construction sites.

  19. 21 CFR 866.4540 - Immunonephelometer equipment.

    Science.gov (United States)

    2010-04-01

    ...) MEDICAL DEVICES IMMUNOLOGY AND MICROBIOLOGY DEVICES Immunology Laboratory Equipment and Reagents § 866.4540 Immunonephelometer equipment. (a) Identification. Immunonephelometer equipment for clinical use...

  20. Logistics at the Amazon forest: the challenge of Urucu-Manaus pipeline construction

    Energy Technology Data Exchange (ETDEWEB)

    Freitas, Ricardo Magalhaes; Araujo, Jorge Marques de; Barbosa, Gilberto Rodrigues; Campos, Marcos Zeferino Teixeira [Petroleo Brasileiro S.A. (PETROBRAS), Rio de Janeiro, RJ (Brazil)

    2009-07-01

    The predominant difficulties and logistics complexities at the Amazon Region, required of the technical body responsible for the construction of the Undertaking Urucu-Manaus Pipeline, technological knowledge and a profound background of the regional particularities, qualities that were determinants for the execution of this significant work. The logistics solutions, supported on an accurate and adequate planning for people, equipment and material mobilization for several front services, were planned considering the constant climatic variables, river flood and dry periods and with the monitoring daily routines of the communities located around the pipeline construction influence area. (author)