WorldWideScience

Sample records for construction cost reductions

  1. Cost-Effectiveness Analysis of Surface Flow Constructed Wetlands (SFCW) for Nutrient Reduction in Drainage Discharge from Agricultural Fields in Denmark.

    Science.gov (United States)

    Gachango, F G; Pedersen, S M; Kjaergaard, C

    2015-12-01

    Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW could be a better optimal nutrients reduction measure in drainage catchments characterized with higher nutrient loads.

  2. Cost-effectiveness analysis of surface flow constructed wetlands (SFCW) for nutrient reduction in drainage discharge from agricultural fields in Denmark

    DEFF Research Database (Denmark)

    Gachango, Florence Gathoni; Pedersen, Søren Marcus; Kjærgaard, Charlotte

    2015-01-01

    Constructed wetlands have been proposed as cost-effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as case studies......, this paper explores the feasibility of implementing surface flow constructed wetlands (SFCW) based on their cost effectiveness. Sensitivity analysis is conducted by varying the cost elements of the wetlands in order to establish the most cost-effective scenario and a comparison with the existing nutrients...... reduction measures carried out. The analyses show that the cost effectiveness of the SFCW is higher in the drainage catchments with higher nutrient loads. The range of the cost effectiveness ratio on nitrogen reduction differs distinctively with that of catch crop measure. The study concludes that SFCW...

  3. Cost reduction of LWRs - The main features

    International Nuclear Information System (INIS)

    Board, J.A.; Norman, D.

    1991-01-01

    For effective generation cost reductions to be achieved while maintaining safety levels, the impact of each of the above element and their interactions must be fully assessed, together with the effects of uncertainty on commercial risk. the amount of interest during construction which must be paid can be minimised by adopting designs, output ratings (unit size), and construction methods which minimise construction time. However this must be done without unduly increasing specific capital cost. Total capital costs can be reduced by sharing design and project launching costs and front-end design and licensing costs, across a series of identical plants. The paper is reviewing costs and performance factors such as those above with the aim of identifying the strategies which might be necessary within and between countries in order to create an environment which would enable cost reductions on LWRs to be made. (author)

  4. Design features and cost reduction potential of JSFR

    International Nuclear Information System (INIS)

    Katoh, Atsushi; Hayafune, Hiroki; Kotake, Shoji

    2014-01-01

    Highlights: • Japan Sodium Cooled Fast Reactor (JSFR) is designed to reduce plant commodity. • Cost reduction effectiveness by innovative designs is estimated by bottom up method. • JSFR achieves 76% construction cost reduction compared with Monju by design effort. • Commercial JSFR construction cost could be less than that of conventional LWR. - Abstract: To improve the economic competitiveness of the Japan Sodium-cooled Fast Reactor (JSFR), several innovative designs have been introduced, e.g. reduction of number of main cooling loop, shorter pipe arrangement by adopting thermally durable material, in fact high chromium ferrite steel, a compact reactor vessel (RV), integration of a primary pump and an intermediate heat exchanger (IHX). Since they had not been introduced in the past and existing reactors, a new approach for construction cost estimation has been introduced to handle innovative technologies, for example, concerning different kinds of material, fabrication processes of equipment etc. As results of JSFR construction cost estimations based on the new method and the latest conceptual JSFR design, economic goals of Generation IV nuclear energy systems can be achieved by expecting the following cost reduction effects: commodity reduction by adopting innovative design, an economy of scale by power generation increase, learning effect etc. It is well analyzed quantitatively that feasibility of innovative designs is essential for economic competitiveness of JSFR

  5. Design features and cost reduction potential of JSFR

    Energy Technology Data Exchange (ETDEWEB)

    Katoh, Atsushi, E-mail: kato.atsushi@jaea.go.jp [Japan Atomic Energy Agency, 4002 Narita, Oarai-machi, Higashi-ibaraki-gun, Ibaraki-ken 311-1393 (Japan); Hayafune, Hiroki [Japan Atomic Energy Agency, 4002 Narita, Oarai-machi, Higashi-ibaraki-gun, Ibaraki-ken 311-1393 (Japan); Kotake, Shoji [The Japan Atomic Power Company, 1-1 Kanda-midoricyo, Chiyoda-ku, Tokyo-to 101-0053 (Japan)

    2014-12-15

    Highlights: • Japan Sodium Cooled Fast Reactor (JSFR) is designed to reduce plant commodity. • Cost reduction effectiveness by innovative designs is estimated by bottom up method. • JSFR achieves 76% construction cost reduction compared with Monju by design effort. • Commercial JSFR construction cost could be less than that of conventional LWR. - Abstract: To improve the economic competitiveness of the Japan Sodium-cooled Fast Reactor (JSFR), several innovative designs have been introduced, e.g. reduction of number of main cooling loop, shorter pipe arrangement by adopting thermally durable material, in fact high chromium ferrite steel, a compact reactor vessel (RV), integration of a primary pump and an intermediate heat exchanger (IHX). Since they had not been introduced in the past and existing reactors, a new approach for construction cost estimation has been introduced to handle innovative technologies, for example, concerning different kinds of material, fabrication processes of equipment etc. As results of JSFR construction cost estimations based on the new method and the latest conceptual JSFR design, economic goals of Generation IV nuclear energy systems can be achieved by expecting the following cost reduction effects: commodity reduction by adopting innovative design, an economy of scale by power generation increase, learning effect etc. It is well analyzed quantitatively that feasibility of innovative designs is essential for economic competitiveness of JSFR.

  6. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    International Nuclear Information System (INIS)

    Timothy Shaw; Vaugh Whisker

    2004-01-01

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project

  7. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Vaugh Whisker

    2004-02-28

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project.

  8. REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Mladen Zelenika

    1998-12-01

    Full Text Available A Contractor usually utilizes the available drilling equipment when constructing just one single well. Drilling cost and time consumption in constructing the well MB-1, using the percussion method, and the well MB-2, using the conventional rotary drilling method, call for a separate analysis in order to justify the investment cost for the acquisition of additional equipment for a single well only. The wells, located in a karst vrtača close to an estavelle near Tomislavgrad, with a diameter of 500 mm and approximately 80 m deep, have been accomplished with a low rate of penetration using the conventional Cable tool and resp. Rotary Drilling Method. In this paper results of analyses for the given circumstances are shown: both the efficiency and cost of the mentioned drilling methods performed by the crews of »Geotehnika d.d.« Zagreb, as well as the justifiability of investments in new equipment are evaluated.

  9. Cost and schedule reduction for next-generation Candu

    International Nuclear Information System (INIS)

    Hopwood, J.M.; Yu, S.; Pakan, M.; Soulard, M.

    2002-01-01

    AECL has developed a suite of technologies for Candu R reactors that enable the next step in the evolution of the Candu family of heavy-water-moderated fuel-channel reactors. These technologies have been combined in the design for the Advanced Candu Reactor TM1 (ACRTM), AECL's next generation Candu power plant. The ACR design builds extensively on the existing Candu experience base, but includes innovations, in design and in delivery technology, that provide very substantial reductions in capital cost and in project schedules. In this paper, main features of next generation design and delivery are summarized, to provide the background basis for the cost and schedule reductions that have been achieved. In particular the paper outlines the impact of the innovative design steps for ACR: - Selection of slightly enriched fuel bundle design; - Use of light water coolant in place of traditional Candu heavy water coolant; - Compact core design with unique reactor physics benefits; - Optimized coolant and turbine system conditions. In addition to the direct cost benefits arising from efficiency improvement, and from the reduction in heavy water, the next generation Candu configuration results in numerous additional indirect cost benefits, including: - Reduction in number and complexity of reactivity mechanisms; - Reduction in number of heavy water auxiliary systems; - Simplification in heat transport and its support systems; - Simplified human-machine interface. The paper also describes the ACR approach to design for constructability. The application of module assembly and open-top construction techniques, based on Candu and other worldwide experience, has been proven to generate savings in both schedule durations and overall project cost, by reducing premium on-site activities, and by improving efficiency of system and subsystem assembly. AECL's up-to-date experience in the use of 3-D CADDS and related engineering tools has also been proven to reduce both engineering and

  10. Reduction of LNG FOB cost

    International Nuclear Information System (INIS)

    Aoki, Ichizo; Kikkawa, Yoshitsugi

    1997-01-01

    To achieve a competitive LNG price for the consumers against other energy sources, reduction of LNG FOB (Free on Board) cost i.e. LNG cost at LNG ship flange, will be the key item. It is necessary to perform a many optimization studies (or value engineering) for each stage of the LNG project. These stages are: Feasibility study; Conceptual design - FEED (Front End Engineering and Design); EPC (Engineering, Procurement and Construction); Operation and maintenance. Since the LNG plant forms one part of the LNG chain, starting from gas production to LNG receiving, and requires several billion US dollar of investment, the consequences of a plant shut down on the LNG chain are clear, it is, therefore, important to get high availability which will also contribute the reduction of LNG FOB cost. (au) 25 refs

  11. Development of a simple estimation tool for LMFBR construction cost

    International Nuclear Information System (INIS)

    Yoshida, Kazuo; Kinoshita, Izumi

    1999-01-01

    A simple tool for estimating the construction costs of liquid-metal-cooled fast breeder reactors (LMFBRs), 'Simple Cost' was developed in this study. Simple Cost is based on a new estimation formula that can reduce the amount of design data required to estimate construction costs. Consequently, Simple cost can be used to estimate the construction costs of innovative LMFBR concepts for which detailed design has not been carried out. The results of test calculation show that Simple Cost provides cost estimations equivalent to those obtained with conventional methods within the range of plant power from 325 to 1500 MWe. Sensitivity analyses for typical design parameters were conducted using Simple Cost. The effects of four major parameters - reactor vessel diameter, core outlet temperature, sodium handling area and number of secondary loops - on the construction costs of LMFBRs were evaluated quantitatively. The results show that the reduction of sodium handling area is particularly effective in reducing construction costs. (author)

  12. Reduction of construction periods of PWRs by optimization of detailed sequence planning

    International Nuclear Information System (INIS)

    Stocker, W.; Leverenz, R.

    1991-01-01

    The construction of PWR's is an enterprise with high investment costs, in total up to three billion US$ and with long construction periods of five years and more. Besides the results reached by the intensive standardization, a further reduction of the construction period is possible by optimization of detailed sequence planning and interfaces of work units. During the execution of the three German Convoy plants ISAR 2, EMSLAND and NECKARWESTHEIM 2, the contractual construction periods were shortened between 4 and 8 months. These reductions were reached after individual investigations by measures like advanced finishing work activities; erection of an increased amount of prefabricated pipings; rearrangement of erection sequences; overlapping of piping erection and electrical installation; reduction of plant commissioning period. All these measures support directly the reduction of the total investment cost of a plant, as already demonstrated by the Convoy plants. (author). 8 figs

  13. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-01-01

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups

  14. Generation IV Nuclear Energy Systems Construction Cost Reductions through the use of Virtual Environments: Task 1 Completion Report

    Energy Technology Data Exchange (ETDEWEB)

    Whisker, V.E.; Baratta, A.J.; Shaw, T.S.; Winters, J.W.; Trikouros, N.; Hess, C.

    2002-11-26

    OAK B204 The objective of this project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. Specifically, this project will test the suitability of Immersive Projection Display (IPD) technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups.

  15. Cost Based Value Stream Mapping as a Sustainable Construction Tool for Underground Pipeline Construction Projects

    Directory of Open Access Journals (Sweden)

    Murat Gunduz

    2017-11-01

    Full Text Available This paper deals with application of Value Stream Mapping (VSM as a sustainable construction tool on a real construction project of installation of underground pipelines. VSM was adapted to reduce the high percentage of non-value-added activities and time wastes during each construction stage and the paper searched for an effective way to consider the cost for studied construction of underground pipeline. This paper is unique in its way that it adopts cost implementation of VSM to improve the productivity in underground pipeline projects. The data was observed and collected from site during construction, indicating the cycle time, value added and non-value added of each construction stage. The current state was built based on these details. This was an eye-opening exercise and a process management tool as a trigger for improvement. After the current state assessment, a future state is attempted by Value Stream Mapping tool balancing the resources using a Line of Balance (LOB technique. Moreover, a sustainable cost estimation model was developed during current state and future state to calculate the cost of underground pipeline construction. The result shows a cost reduction of 20.8% between current and future states. This reflects the importance of the cost based Value Stream Mapping in construction as a sustainable measurement tool. This new tool could be utilized in construction industry to add the sustainability and effective cost management.

  16. A capital cost reduction study on the fast breeder reactor plant

    International Nuclear Information System (INIS)

    Taniyama, H.; Kamei, M.; Moriyama, M.

    1991-01-01

    A capital cost reduction study has been performed for large fast breeder reactor designs. The primary objective of this study is to show a trend of capital cost reduction between FBR plants at the prototype stage, the demonstration stage, and the future commercialization stage. For the FBR plant at the demonstration stage a construction cost comparison with a light water reactor has also been performed, and the target cost of FBR of below 1.5 times that of the light water reactor cost was achieved. To extend the capital cost reduction study, a feasibility study was made to achieve a capital cost of an FBR less than that of a light water reactor. The recommended design is shown as a future commercialization FBR design concept. (author)

  17. NPP construction cost in Canada

    International Nuclear Information System (INIS)

    Gorshkov, A.L.

    1988-01-01

    The structure of capital costs during NPP construction in Canada is considered. Capital costs comprise direct costs (cost of the ground and ground rights, infrastructure, reactor equipment, turbogenerators, electrotechnical equipment, auxiliary equipment), indirect costs (construction equipment and services, engineering works and management services, insurance payments, freight, training, operating expenditures), capital per cents for the period of construction and cost of heavy water storages. It proceeds from the analysis of the construction cost structure for a NPP with the CANDU reactor of unit power of 515, 740 and 880 MW, that direct costs make up on the average 62%

  18. Cost-Reduction Roadmap for Residential Solar Photovoltaics (PV), 2017-2030

    Energy Technology Data Exchange (ETDEWEB)

    Cook, Jeffrey J. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Ardani, Kristen B. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Margolis, Robert M. [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Fu, Ran [National Renewable Energy Laboratory (NREL), Golden, CO (United States)

    2018-01-03

    The installed cost of solar photovoltaics (PV) has fallen rapidly in recent years and is expected to continue declining in the future. In this report, we focus on the potential for continued PV cost reductions in the residential market. From 2010 to 2017, the levelized cost of energy (LCOE) for residential PV declined from 52 cents per kilowatt-hour (cents/kWh) to 16 cents/kWh (Fu et al. 2017). The U.S. Department of Energy's (DOE's) Solar Energy Technologies Office (SETO) recently set new LCOE targets for 2030, including a target of 5 cents/kWh for residential PV. We present a roadmap for achieving the SETO 2030 residential PV target. Because the 2030 target likely will not be achieved under business-as-usual trends (NREL 2017), we examine two key market segments that demonstrate significant opportunities for cost savings and market growth: installing PV at the time of roof replacement and installing PV as part of the new home construction process. Within both market segments, we identify four key cost-reduction opportunities: market maturation, business model integration, product innovation, and economies of scale. To assess the potential impact of these cost reductions, we compare modeled residential PV system prices in 2030 to the National Renewable Energy Laboratory's (NREL's) quarter one 2017 (Q1 2017) residential PV system price benchmark (Fu et al. 2017). We use a bottom-up accounting framework to model all component and project-development costs incurred when installing a PV system. The result is a granular accounting for 11 direct and indirect costs associated with installing a residential PV system in 2030. All four modeled pathways demonstrate significant installed-system price savings over the Q1 2017 benchmark, with the visionary pathways yielding the greatest price benefits. The largest modeled cost savings are in the supply chain, sales and marketing, overhead, and installation labor cost categories. When we translate these

  19. Reduction of capital costs of nuclear power plants. NEA-report

    International Nuclear Information System (INIS)

    2000-01-01

    Since the the mid-1980s, the declining real prices of fossil fuels and the significant improvements in thermal efficiencies of combined cycle power plants have eroded the economic competitiveness of nuclear power plants in most OECD countries. In order for nuclear power to remain a viable option for the next millennium, the cost of electricity from nuclear power plant must be greatly reduced to be competitive with alternative sources. Of the three major components of nuclear generation cost - capital, O and M and fuel - the capital cost component makes up approximately 60 per cent of the total. Therefore, identification of the means to reduce the capital costs of nuclear power plants is a high priority activity toward keeping nuclear power competitive. Among a number of capital cost reduction measures, the principal ones were agreed by the expert group as follows: Increased plant size, improved construction methods, reduced construction schedule, design improvement, improved procurement, organisation and contractual aspects, standardisation and construction in series, multiple unit construction, regulatory and policy reform. (orig.)

  20. Constraints to 3R construction waste reduction among contractors in Penang

    Science.gov (United States)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2018-04-01

    Rapid development of construction industry increases construction waste on landfill leading to shorter life span of the landfill. Waste reduction through Reduce, Reuse and Recycle (3R) practice has been encouraged in construction industry towards sustainable waste management since couple of decades ago. However, waste reduction through 3R is still at its infancy in construction industry in Penang, Malaysia. The aim of this paper is to determinate the constraints to construction waste reduction through 3R among contractors in Penang. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 based in Penang, experts from Penang Local Authority, CIDB in Penang and its headquarters, National Solid Waste Management Department, and headquarters of Solid Waste and Public Cleansing Management Corporation (SWCorp). Based on interviews and questionnaire surveys, constraints identified are Time and cost, Contractor’s attitude and low participation, Lack of enforcement law and regulation, Lack of awareness and knowledge, Lack of coordination, and Lack of space. Awareness and knowledge, and enforcement law and regulation are the major barriers which influence others constraints as well. Therefore, these constraints should be emphasized by the authorities in order to improve the implementation of 3R construction waste reduction.

  1. Cost effectiveness of DH-network construction. Final report; Kaukolaempoeverkon rakentamisen kehittaeminen; Loppuraportti

    Energy Technology Data Exchange (ETDEWEB)

    Kivistoe, V.M. [Ekono Energy Ltd, Espoo (Finland)

    1993-12-31

    Construction cost of DH networks were analyzed in the study. Basing on the analysis, those areas of construction activities were selected, where cost effectiveness could be improved. According to the study, the civil works` cost form about half of the total construction cost on small diameter networks and 30..40 % of the cost of larger sizes. The impact of the design on the construction cost should be emphasized. According to the study it is possible to find significant reduction in the construction cost by increased use of twin pipe where the both carrier pipes are included in the same insulation casing. In small network sizes the reduction of cost achievable by the above is about 30..35 % and in larger sizes about 10 % (DN 125..DN 200) when comparing with a design by individual pipes. The use of twin pipe also causes savings in thermal loss. In sizes DN 65 and up, the saving in heat loss is about 90..95 FIM/m which represents about half of the total savings when compared with design by individual pipes. The possibility of prestressing the twin pipe element at factory in order to shorten the installation time at site was also studied and test pipes was also done. By factory prestressing it would be possible to avoid preheating of pipes at construction site. The trench could be backfilled immediately after pipe laying, welding and inspections. Theoretically and based on test pipes done the prestressing of twin pipe element looks very promising. When factory prestressing would be used, the open time of the trench is reduced significantly and for instance the disturbance to traffic is smaller. As well the use of labour and machinery at site could be more effective

  2. 25 CFR 700.467 - Construction costs.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...

  3. Construction and operation costs of constructed wetlands treating wastewater.

    Science.gov (United States)

    Gkika, Dimitra; Gikas, Georgios D; Tsihrintzis, Vassilios A

    2014-01-01

    Design data from nine constructed wetlands (CW) facilities of various capacities (population equivalent (PE)) are used to estimate construction and operation costs, and then to derive empirical equations relating the required facility land area and the construction cost to PE. In addition, comparisons between the costs of CW facilities based on various alternative construction materials, i.e., reinforced concrete and earth structures (covered with either high density polyethylene or clay), are presented in relation to the required area. The results show that earth structures are economically advantageous. The derived equations can be used for providing a preliminary cost estimate of CW facilities for domestic wastewater treatment.

  4. Improvement of Cost Calculation in Constructions – Application of the Standard Cost Method

    Directory of Open Access Journals (Sweden)

    Adela Breuer

    2010-12-01

    Full Text Available Grace to the analysis of several commercial companies effectively performed “on the field”, we could remark the necessity to change the method of cost calculation, our motivation being related to the simplification of calculations and the reduction of the labour volume, but especially the necessity to know in due time the deviations occurred as well as the causes having led to their apparition. The importance of knowing the deviations in due time results from the very basic characteristics of the constructions execution, i.e. the performance of works during several budgetary years, which leads to the modifications of prices and materials, the introduction of new technologies, and to the performance of open air activities, making the execution of constructions works be influenced by the atmospheric condition. But the most important aspect of knowing the deviations is the correct determination of expenses and their inscribing in the corresponding period, in view of determining the result of the budgetary year. Our proposal for the enhancement of the method of cost calculation in constructions is the application of the standard cost method in the variant “single standard cost”.

  5. Social cost in construction projects

    International Nuclear Information System (INIS)

    Çelik, Tolga; Kamali, Saeed; Arayici, Yusuf

    2017-01-01

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  6. Social cost in construction projects

    Energy Technology Data Exchange (ETDEWEB)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr [Department of Civil Engineering, Eastern Mediterranean University, Famagusta, T.R. North Cyprus, Via Mersin 10 (Turkey); Kamali, Saeed, E-mail: saeedkamali2002@gmail.com [Civil Engineering Department, Middle East Technical University, 06800 Ankara (Turkey); Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr [Department of Civil Engineering, Hasan Kalyoncu University, Gaziantep (Turkey)

    2017-05-15

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agenda of Environmental Impact Assessors.

  7. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthelemy, Michel; Escobar Rangel, Lina

    2013-01-01

    This paper provides the first comparative analysis of nuclear reactor construction costs in France and the United States. Studying the cost of nuclear power has often been a challenge, owing to the lack of reliable data sources and heterogeneity between countries, as well as the long time horizon which requires controlling for input prices and structural changes. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using expected demand variation as an instrument. We argue that benefits from nuclear reactor program standardization can arise through short term coordination gains, when the diversity of nuclear reactors' technologies under construction is low, or through long term benefits from learning spillovers from past reactor construction experience, if those spillovers are limited to similar reactors. We find that overnight construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect-Engineer (A- E). In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. (authors)

  8. Cost-Benefit Analysis of Green Infrastructures on Community Stormwater Reduction and Utilization: A Case of Beijing, China.

    Science.gov (United States)

    Liu, Wen; Chen, Weiping; Feng, Qi; Peng, Chi; Kang, Peng

    2016-12-01

    Cost-benefit analysis is demanded for guiding the plan, design and construction of green infrastructure practices in rapidly urbanized regions. We developed a framework to calculate the costs and benefits of different green infrastructures on stormwater reduction and utilization. A typical community of 54,783 m 2 in Beijing was selected for case study. For the four designed green infrastructure scenarios (green space depression, porous brick pavement, storage pond, and their combination), the average annual costs of green infrastructure facilities are ranged from 40.54 to 110.31 thousand yuan, and the average of the cost per m 3 stormwater reduction and utilization is 4.61 yuan. The total average annual benefits of stormwater reduction and utilization by green infrastructures of the community are ranged from 63.24 to 250.15 thousand yuan, and the benefit per m 3 stormwater reduction and utilization is ranged from 5.78 to 11.14 yuan. The average ratio of average annual benefit to cost of four green infrastructure facilities is 1.91. The integrated facilities had the highest economic feasibility with a benefit to cost ratio of 2.27, and followed by the storage pond construction with a benefit to cost ratio of 2.14. The results suggested that while the stormwater reduction and utilization by green infrastructures had higher construction and maintenance costs, their comprehensive benefits including source water replacements benefits, environmental benefits and avoided cost benefits are potentially interesting. The green infrastructure practices should be promoted for sustainable management of urban stormwater.

  9. Nuclear reactors' construction costs: The role of lead-time, standardization and technological progress

    International Nuclear Information System (INIS)

    Berthélemy, Michel; Escobar Rangel, Lina

    2015-01-01

    This paper provides an econometric analysis of nuclear reactor construction costs in France and the United States based on overnight costs data. We build a simultaneous system of equations for overnight costs and construction time (lead-time) to control for endogeneity, using change in expected electricity demand as instrument. We argue that the construction of nuclear reactors can benefit from standardization gains through two channels. First, short term coordination benefits can arise when the diversity of nuclear reactors' designs under construction is low. Second, long term benefits can occur due to learning spillovers from past constructions of similar reactors. We find that construction costs benefit directly from learning spillovers but that these spillovers are only significant for nuclear models built by the same Architect–Engineer. In addition, we show that the standardization of nuclear reactors under construction has an indirect and positive effect on construction costs through a reduction in lead-time, the latter being one of the main drivers of construction costs. Conversely, we also explore the possibility of learning by searching and find that, contrary to other energy technologies, innovation leads to construction costs increases. -- Highlights: •This paper analyses the determinants of nuclear reactors construction costs and lead-time. •We study short term (coordination gains) and long term (learning by doing) benefits of standardization in France and the US. •Results show that standardization of nuclear programs is a key factor for reducing construction costs. •We also suggest that technological progress has contributed to construction costs escalation

  10. Sequential Construction of Costly Networks

    Energy Technology Data Exchange (ETDEWEB)

    Gutfraind, Alexander [Los Alamos National Laboratory

    2011-01-01

    Natural disasters or attacks often disrupt infrastructure networks requiring a costly recovery. This motivates an optimization problem where the objecitve is to construct the nodes of a graph G(V;E), and the cost of each node is dependent on the number of its neighbors previously constructed, or more generally, any properties of the previously-completed subgraph. In this optimization problem the objective is to find a permutation of the nodes which results in the least construction cost. We prove that in the case where the cost of nodes is a convex function in the number of neighbors, the optimal construction sequence is to start at a single node and move outwards. We also introduce algorithms and heuristics for solving various instances of the problem. Those methods can be applied to help reduce the cost of recovering from disasters as well as to plan the deployment of new network infrastructure.

  11. Cost reduction through system integration

    International Nuclear Information System (INIS)

    Helsing, P.

    1994-01-01

    In resent years cost reduction has been a key issue in the petroleum industry. Several findings are not economically attractive at the current cost level, and for this and other reasons some of the major oil companies require the suppliers to have implemented a cost reduction programme to prequalify for projects. The present paper addresses cost reduction through system design and integration in both product development and working methods. This is to be obtained by the combination of contracts by reducing unnecessary coordination and allow re-use of proven interface designs, improve subsystem integration by ''top down'' system design, and improve communication and exchange of experience. 3 figs

  12. CONSTRUCTION COST PREDICTION USING NEURAL NETWORKS

    Directory of Open Access Journals (Sweden)

    Smita K Magdum

    2017-10-01

    Full Text Available Construction cost prediction is important for construction firms to compete and grow in the industry. Accurate construction cost prediction in the early stage of project is important for project feasibility studies and successful completion. There are many factors that affect the cost prediction. This paper presents construction cost prediction as multiple regression model with cost of six materials as independent variables. The objective of this paper is to develop neural networks and multilayer perceptron based model for construction cost prediction. Different models of NN and MLP are developed with varying hidden layer size and hidden nodes. Four artificial neural network models and twelve multilayer perceptron models are compared. MLP and NN give better results than statistical regression method. As compared to NN, MLP works better on training dataset but fails on testing dataset. Five activation functions are tested to identify suitable function for the problem. ‘elu' transfer function gives better results than other transfer function.

  13. Cost reduction and safety design features of new nuclear power plants in India. Annex 13

    International Nuclear Information System (INIS)

    Sharma, V.K.

    2002-01-01

    Indian Nuclear Power Programme is designed to exploit limited reserves of uranium and extensive resource of thorium. Pressurised heavy water reactors are found most suitable and form the main stay of the first stage of the programme. Thorium utilisation is achieved in the second and third stages. Today India has total installed capacity of 2720 MWe of PHWRs which are operating with high plant load factors of over 80%. Rich experience of construction and operation of over 150 reactor years is being utilised in effecting cost reduction and safety improvements. Standardisation and reduction in gestation period by preproject activities, advance procurement and work packages of engineer, procure, construct and commission are some of the techniques being adopted for cost reduction in the new projects. But the cost of safety is rising. Design basis event of double ended guillotine rupture of primary pressure boundary needs a relook based on current knowledge of material behaviour. This event appears improbable. Similarly some of the safety related systems like closed loop cooling water operating at low temperature and pressure, and low usage factors may be designed as per standard codes without invoking special nuclear requirements. The paper will address these issues and highlight the possible areas for cost reduction both in operating and safety systems. Modern construction and project management techniques are being employed. Gestation period of 5 years and cost of less than US $1400 per KWe are the present targets. In Indian environment nuclear power is found to be competitive with thermal power plants at distances of about 800 Kms from the coal mines. (author)

  14. Use of cost-effective construction technologies in India to mitigate climate change

    Energy Technology Data Exchange (ETDEWEB)

    Sengupta, N. [Forum of Scientists, Engineers and Technologists, Kolkata (India)

    2008-01-10

    Concentration of greenhouse gases plays a major role in raising the earth's temperature. Carbon dioxide, produced from burning of fossil fuels, is the principle greenhouse gas and efforts are being made at international level to reduce its emission through adoption of energy-efficient technologies. The UN Conference on Environment and Development, 1992 made a significant development in this field by initiating the discussion on sustainable development under the Agenda 21. Cost-effective construction technologies can bring down the embodied energy level associated with production of building materials by lowering use of energy-consuming materials. This embodied energy is a crucial factor for sustainable construction practices and effective reduction of the same would contribute in mitigating global warming. The cost-effective construction technologies would emerge as the most acceptable case of sustainable technologies in India both in terms of cost and environment.

  15. PV O&M Cost Model and Cost Reduction

    Energy Technology Data Exchange (ETDEWEB)

    Walker, Andy

    2017-03-15

    This is a presentation on PV O&M cost model and cost reduction for the annual Photovoltaic Reliability Workshop (2017), covering estimating PV O&M costs, polynomial expansion, and implementation of Net Present Value (NPV) and reserve account in cost models.

  16. Cost reduction in deep water production systems

    International Nuclear Information System (INIS)

    Beltrao, R.L.C.

    1995-01-01

    This paper describes a cost reduction program that Petrobras has conceived for its deep water field. Beginning with the Floating Production Unit, a new concept of FPSO was established where a simple system, designed to long term testing, can be upgraded, on the location, to be the definitive production unit. Regarding to the subsea system, the following projects will be considered. (1) Subsea Manifold: There are two 8-well-diverless manifolds designed for 1,000 meters presently under construction and after a value analysis, a new design was achieved for the next generation. Both projects will be discussed and a cost evaluation will also be provided. (2) Subsea Pipelines: Petrobras has just started a large program aiming to reduce cost on this important item. There are several projects such as hybrid (flexible and rigid) pipes for large diameter in deep water, alternatives laying methods, rigid riser on FPS, new material...etc. The authors intend to provide an overview of each project

  17. The importance of capital cost reduction in improving nuclear economics

    International Nuclear Information System (INIS)

    Langmo, A.; Braun, C.

    1996-01-01

    In the developed countries having existing nuclear programs, the situation necessitates lower total power generation cost. The restructuring of utility industry due to the deregulation causes to reorganize the ownership of some nuclear plants, and the overall economics of nuclear plants in relation to their local competition is reexamined. The reluctance to make any new long term capital cost commitment arises, and it makes new plant construction less likely in near future, and plant upgrading and improvement to be put to intense scrutiny. The capital cost recovery in existing nuclear plants in USA is discussed. It is important to recognize that there is very little that can be done to affect already expended capital, and only that can be done is to improve plant capacity factors, besides write-off. The roles of architects and engineers in improved plant economics are now evaluated by the various organizations which are interested in the participation in new nuclear industry reorganization and restructuring. The reduction of operation and maintenance costs and capital investment, and the improvement of capacity factor are reported. In new ALWR construction program, architects and engineers can significantly support the control of plant capital costs by the selection of the plant design and the sites, and the strategies of procurement and contract, construction schedule and others. (K.I.)

  18. New plant construction cost and schedule

    International Nuclear Information System (INIS)

    Akins, M. J.

    2009-01-01

    The presentation covers the following topics: cost structure; capital costs; variation of capital costs; trends in power plant construction; studies of costs completion; periods and risks. Nuclear plant costs have recently risen so rapidly that vendors are not willing to publicly commit to cost estimates: ∼ $2000/Kw overnight costs in 2006 in the US market > $4000/Kw and in 2008 in the US market > $6000/Kw in 2008 in emerging markets. There is vendors pricing uncertainty. Current contract models may not apply. Current construction projects have problems: Olkiluoto-3 is reported to be 50% over budget and two years behind schedule, increasing perceptions that nuclear costs will continue to increase rapidly; Price of materials is a big volatile unknown, which may decrease Labor could become more available due to limited number of new projects; Lack of debt/credit to finance new project may decrease demand of new construction

  19. Construction Cost Management in Resource Based Economy

    OpenAIRE

    Elazzazy, Muhammad

    2017-01-01

    Resource Based Economy tested according to criteria formulated from the construction cost management best practices. A cost management plan modeled to demonstrate the possibility of construction management under a new socio-economic system, which counts the consumed natural resources by construction as the dry cost to the environment.

  20. REDUCTION OF THE PRODUCTION COST. EXPERIENCE OF THE COSTS REDUCTION AT RUP “BMZ”

    Directory of Open Access Journals (Sweden)

    S. S. Sereda

    2004-01-01

    Full Text Available The method of the daily operative monitoring of the costs for reduction of net cost and reinforcement of control on the costs has been applied for the first time in 2003 in RB at RUP “BMZ”, that allowed for the enterprise to control the costs in regime of real time.

  1. Residential construction cost: An Italian survey.

    Science.gov (United States)

    Canesi, Rubina; Marella, Giuliano

    2017-04-01

    This paper reports data describing development projects for new buildings according to construction costs in North-East Italy. A survey was carried out on local companies undertaking new residential development projects in two Italian regions (Veneto and Lombardy). The aim of this survey was to record new real estate construction projects, collecting both technical and socio-economic cost features. It is extremely difficult to collect such data for the Italian real estate construction sector, due to its lack of transparency, so that the novelty for the Italian scenario is the dataset itself. Another interest perspective of this survey is that socio-economic characteristics were also recorded; they are often studied in urban economics, but are usually related to property purchase prices and values, not to construction costs. The data come from an analysis of Canesi and Marella regarding the relationship between the trend of construction costs and the socio-economic conditions of the reference setting, such as the mean years of schooling of the workforce, housing market trends, and average per capita income.

  2. Residential construction cost: An Italian survey

    Directory of Open Access Journals (Sweden)

    Rubina Canesi

    2017-04-01

    Full Text Available This paper reports data describing development projects for new buildings according to construction costs in North-East Italy. A survey was carried out on local companies undertaking new residential development projects in two Italian regions (Veneto and Lombardy. The aim of this survey was to record new real estate construction projects, collecting both technical and socio-economic cost features. It is extremely difficult to collect such data for the Italian real estate construction sector, due to its lack of transparency, so that the novelty for the Italian scenario is the dataset itself. Another interest perspective of this survey is that socio-economic characteristics were also recorded; they are often studied in urban economics, but are usually related to property purchase prices and values, not to construction costs. The data come from an analysis of Canesi and Marella regarding the relationship between the trend of construction costs and the socio-economic conditions of the reference setting, such as the mean years of schooling of the workforce, housing market trends, and average per capita income.

  3. EPR project construction cost control

    International Nuclear Information System (INIS)

    Duflo, D.; Pouget-Abadie, X.; Dufour, A.; Kauffmann, G.

    2001-01-01

    The EPR project is now managed by EDF in cooperation with the German Utilities. The main engineering activities for this period are related to the preparation of construction project management, deepening of some safety issues, definition of the project technical reference. The EPR project concerns the so-called reference unit, that is an isolated first-off unit, with unit electrical power of about 1500 MW. The construction costs evaluated are those of the nuclear island, the conventional island, site facilities, installation work and the administrative buildings. The EPR project construction cost evaluation method applies to all the equipment installed and commissioned. It requires the availability of a preliminary project detailed enough to identify the bill of quantities. To these quantities are then assigned updated unit prices that are based either on cost bases for similar and recent facilities or taken from request for quotation for similar equipment or result from gains due to contractual conditions benefiting from simplifications in the functional and technical specifications. The input and output data are managed in a model that respects the breakdown on which the evaluation method is based. The structural organization of this method reflects a functional breakdown on the one hand (nuclear island, conventional island, common site elements) and on the other hand a breakdown according to equipment or activity (civil engineering, mechanics, electricity, instrumentation and control). This paper discusses the principle and the method of construction cost evaluation carried out, the cost data base and input and output parameters as well as results and oncoming cost analysis tasks. (author)

  4. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  5. Spreadsheet tool for estimating noise reduction costs

    International Nuclear Information System (INIS)

    Frank, L.; Senden, V.; Leszczynski, Y.

    2009-01-01

    The Northeast Capital Industrial Association (NCIA) represents industry in Alberta's industrial heartland. The organization is in the process of developing a regional noise management plan (RNMP) for their member companies. The RNMP includes the development of a noise reduction cost spreadsheet tool to conduct reviews of practical noise control treatments available for individual plant equipment, inclusive of ranges of noise attenuation achievable, which produces a budgetary prediction of the installed cost of practical noise control treatments. This paper discussed the noise reduction cost spreadsheet tool, with particular reference to noise control best practices approaches and spreadsheet tool development such as prerequisite, assembling data required, approach, and unit pricing database. Use and optimization of the noise reduction cost spreadsheet tool was also discussed. It was concluded that the noise reduction cost spreadsheet tool is an easy interactive tool to estimate implementation costs related to different strategies and options of noise control mitigating measures and was very helpful in gaining insight for noise control planning purposes. 2 tabs.

  6. Historical construction costs of global nuclear power reactors

    International Nuclear Information System (INIS)

    Lovering, Jessica R.; Yip, Arthur; Nordhaus, Ted

    2016-01-01

    The existing literature on the construction costs of nuclear power reactors has focused almost exclusively on trends in construction costs in only two countries, the United States and France, and during two decades, the 1970s and 1980s. These analyses, Koomey and Hultman (2007); Grubler (2010), and Escobar-Rangel and Lévêque (2015), study only 26% of reactors built globally between 1960 and 2010, providing an incomplete picture of the economic evolution of nuclear power construction. This study curates historical reactor-specific overnight construction cost (OCC) data that broaden the scope of study substantially, covering the full cost history for 349 reactors in the US, France, Canada, West Germany, Japan, India, and South Korea, encompassing 58% of all reactors built globally. We find that trends in costs have varied significantly in magnitude and in structure by era, country, and experience. In contrast to the rapid cost escalation that characterized nuclear construction in the United States, we find evidence of much milder cost escalation in many countries, including absolute cost declines in some countries and specific eras. Our new findings suggest that there is no inherent cost escalation trend associated with nuclear technology. - Highlights: •Comprehensive analysis of nuclear power construction cost experience. •Coverage for early and recent reactors in seven countries. •International comparisons and re-evaluation of learning. •Cost trends vary by country and era; some experience cost stability or decline.

  7. Analysis of nuclear-power construction costs

    International Nuclear Information System (INIS)

    Jansma, G.L.; Borcherding, J.D.

    1988-01-01

    This paper discusses the use of regression analysis for estimating construction costs. The estimate is based on an historical data base and quantification of key factors considered external to project management. This technique is not intended as a replacement for detailed cost estimates but can provide information useful to the cost-estimating process and to top management interested in evaluating project management. The focus of this paper is the nuclear-power construction industry but the technique is applicable beyond this example. The approach and critical assumptions are also useful in a public-policy situation where utility commissions are evaluating construction in prudence reviews and making comparisons to other nuclear projects. 13 references, 2 figures

  8. Analysis of nuclear power plant construction costs

    International Nuclear Information System (INIS)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs

  9. Analysis of nuclear power plant construction costs

    Energy Technology Data Exchange (ETDEWEB)

    1986-01-01

    The objective of this report is to present the results of a statistical analysis of nuclear power plant construction costs and lead-times (where lead-time is defined as the duration of the construction period), using a sample of units that entered construction during the 1966-1977 period. For more than a decade, analysts have been attempting to understand the reasons for the divergence between predicted and actual construction costs and lead-times. More importantly, it is rapidly being recognized that the future of the nuclear power industry rests precariously on an improvement in the cost and lead-time situation. Thus, it is important to study the historical information on completed plants, not only to understand what has occurred to also to improve the ability to evaluate the economics of future plants. This requires an examination of the factors that have affected both the realized costs and lead-times and the expectations about these factors that have been formed during the construction process. 5 figs., 22 tabs.

  10. 874 CONSTRUCTION COST MODELS FOR HIGHRISE OFFICE ...

    African Journals Online (AJOL)

    USER

    2015-10-28

    Oct 28, 2015 ... will not only reduce the stress on estimators but also enhance the accuracy of cost estimates. The resulting 11 ... cost estimating process to work together to ..... construction estimators in Hong. Kong. Construction Management.

  11. Evaluation of construction cost of pyro-partitioning plant

    International Nuclear Information System (INIS)

    Kinoshita, Kensuke; Kurata, Masateru; Inoue, Tadashi

    1999-01-01

    This study was conducted to evaluate the construction cost of a pyro-partitioning plant. The plant capacity was chosen to accommodate processing of the HLLW generated by PUREX reprocessing of 800 ton of spent LWR fuel. The block flow diagram and mass balance obtained from our previous experimental data were used to produce a detailed process-flow diagram and to design the plant. In this evaluation, the plant was estimated to cover an area of about 90 m x 70 m, and to cost $576 million for construction. This study shows that the cost of process equipments, such as reaction vessels, accountability tanks and so on, is just about 13% of total construction cost. On the other hand, the cost of process robots and the equipments for key measurement point (KMP) is major part in the cost of in-cell equipment. So it is clear that the construction cost can be reduced by reducing the number of material balance area (MBA) and KMP. (author)

  12. VE of construction industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1987-10-15

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  13. VE of construction industry

    International Nuclear Information System (INIS)

    1987-10-01

    This book gives descriptions of basic of VE of construction industry including doing away with mannerism, necessity of cost reduction, management method of cost reduction, thinking of idea, target of VE, starting VE activity, technical method of VE of construction industry such as thinking of idea with brainstorming, function trade method, new brainstorming, MM method, morphology analysis and lateral thinking, cases of VE of construction industry.

  14. Cost reduction for large turbine generator Pedestal in high seismic zone

    International Nuclear Information System (INIS)

    Sawhney, P.S.; Irani, P.; Pusheck, B.N.

    1985-01-01

    Turbine Generator Pedestals have generally been designed using reinforced concrete. For present day large turbine generators (1100 MWe class and above) with tall (about 80 feet) pedestals, the amount of reinforcing steel becomes quite large, especially for plants in high seismic zones. With the prime objective of cost reduction, an approach using steel/concrete composite design has been studied for a large BWR Turbine Generator pedestal with 0.3g peak ground acceleration. Large prefabricated steel modules were adopted for composite design and simplified construction. Design was based on the ACI and AISC codes. Costs and schedules were developed and compared with those for a conventionally designed reinforced concrete pedestal. Composite design was found to give considerable cost and schedule advantage over the conventional reinforced concrete design

  15. Electric utility power plant construction costs, 1st Edition

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    New UDI report combines historical construction costs for more than 1,000 coal, oil, gas, nuclear and geothermal units that have entered commercial operation since 1966 and projected power plant construction costs for about 400 utility-owned generating units scheduled to enter commercial operation during the next 20 years. Key design characteristics and equipment suppliers, A/E, constructor and original installed cost data. Direct construction costs without AFUDC are provided where known. Historical construction cost data are also provided for about 130 utility-owned hydroelectric, gas turbine, combined-cycle and diesel units (these data are generally for units entering service after 1980)

  16. Investigation of different modifications of the modular high temperature reactor for cost reduction

    International Nuclear Information System (INIS)

    Heek, A. van.

    1993-06-01

    Regarding the specific costs reactor with low power output have disadvantages compared to large reactors. In this study it was investigated for the HTR Module how to reduce the specific investment costs and consequently the electricity production costs by modification of the reactor and the power plant design. To reduce the investment costs different design changes were investigated, e.g. possible alternatives for the arrangement of the reactors and the steam generators and a different building layout. The cost reduction gained by a more compact type of construction and a reduction of the number of large components remains below 10%. The use of a gas turbine instead of a steam turbine with steam generator would result in a more efficient cost reduction. The increase in the power output has a much bigger potential to reduce the electricity production costs. The best way to realize this is the changing of the core geometry from cylindric to annular. A module concept with a power maximized under certain boundary conditions (limitation of the core temperatures in case of accident, use of proven technology) was worked out in detail. The optimum core geometry and power density, determined by tolerable accident temperatures and core pressure loss, make a thermal power of 350 MW possible. The physical properties and the accident behaviour in case of pressure release and water ingress were investigated. The specific investment costs and the electricity production costs of a 4-Modular Plant for pure electricity production are reduced about 28% resp. 19% compared with the 200 MWth-Module (KWU/Interatom). (orig.) [de

  17. Pipeline cost reduction through effective project management and applied technology

    Energy Technology Data Exchange (ETDEWEB)

    Jenkins, A. [TransCanada Pipeline Ltd., Alberta (Canada); Babuk, T. [Empress International Inc., Westwood, NJ (United States); Mohitpour, M. [Tempsys Pipeline Solutions Inc., Vancouver, BC (Canada); Murray, M.A. [National Energy Board of Canada (Canada)

    2005-07-01

    Pipelines are regarded by many as passive structures with the technology involved in their construction and operation being viewed as relatively simple and stable. If such is the case how can there be much room for cost improvement? In reality, there have been many technological and regulatory innovations required within the pipeline industry to meet the challenges posed by ever increasing consumer demand for hydrocarbons, the effects of aging infrastructure and a need to control operating and maintenance expenditures. The importance of technology management, as a subset of overall project management, is a key element of life cycle cost control. Assurance of public safety and the integrity of the system are other key elements in ensuring a successful pipeline project. The essentials of best practise project management from an owner/ operator's perspective are set out in the paper. Particular attention is paid to the appropriate introduction of new technology, strategic procurement practice and material selection, indicating that capital cost savings of up to 15% are achievable without harming life cycle cost. The value of partnering leading to technical innovation, cost savings and improved profitability for all the participants is described. Partnering also helps avoid duplicated effort through the use of common tools for design, planning schedule tracking and reporting. Investing in appropriate technology development has been a major source of cost reduction in recent years and the impact of a number of these recently introduced technologies in the areas of materials, construction processes and operation and maintenance are discussed in the paper. (author)

  18. Disaster risk reduction in developing countries: costs, benefits and institutions.

    Science.gov (United States)

    Kenny, Charles

    2012-10-01

    Some 60,000 people worldwide die annually in natural disasters, mostly due to the collapse of buildings in earthquakes, and primarily in the developing world. This is despite the fact that engineering solutions exist that can eliminate almost completely the risk of such deaths. Why is this? The solutions are expensive and technically demanding, so their cost-benefit ratio often is unfavourable as compared to other interventions. Nonetheless, there are various public disaster risk reduction interventions that are highly cost-effective. That such interventions frequently remain unimplemented or ineffectively executed points to a role for issues of political economy. Building regulations in developing countries appear to have limited impact in many cases, perhaps because of inadequate capacity and corruption. Public construction often is of low quality, perhaps for similar reasons. This suggests the need for approaches that emphasise simple and limited disaster risk regulation covering only the most at-risk structures-and that, preferably, non-experts can monitor-as well as numerous transparency and oversight mechanisms for public construction projects. © 2012 The Author(s). Journal compilation © Overseas Development Institute, 2012.

  19. Modern Methods for Cost Management in Construction Enterprises

    Directory of Open Access Journals (Sweden)

    Mesároš Peter

    2015-06-01

    Full Text Available Cost management should be seen as an essential function of enterprises which perform their activities in current market environment. One of the main factors affecting the level of achieved profit and favourable market position is cost structure. The company's ability to obtain necessary and reliable information on their own cost, subsequent processing and effective cost management is crucial for achieving success. This study focuses on cost management and the use of modern methods of cost management in construction enterprises. The aim of this paper is to identify approaches to cost management in Slovak construction enterprises, based on own empirical research.

  20. Construction Cost Growth for New Department of Energy Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kubic, Jr., William L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-05-25

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facility (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.

  1. Theoretical framework of the causes of construction time and cost overruns

    Science.gov (United States)

    Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.

    2017-11-01

    Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.

  2. Oil and gas pipeline construction cost analysis and developing regression models for cost estimation

    Science.gov (United States)

    Thaduri, Ravi Kiran

    In this study, cost data for 180 pipelines and 136 compressor stations have been analyzed. On the basis of the distribution analysis, regression models have been developed. Material, Labor, ROW and miscellaneous costs make up the total cost of a pipeline construction. The pipelines are analyzed based on different pipeline lengths, diameter, location, pipeline volume and year of completion. In a pipeline construction, labor costs dominate the total costs with a share of about 40%. Multiple non-linear regression models are developed to estimate the component costs of pipelines for various cross-sectional areas, lengths and locations. The Compressor stations are analyzed based on the capacity, year of completion and location. Unlike the pipeline costs, material costs dominate the total costs in the construction of compressor station, with an average share of about 50.6%. Land costs have very little influence on the total costs. Similar regression models are developed to estimate the component costs of compressor station for various capacities and locations.

  3. Fast-track, low-cost construction starts with the owner

    International Nuclear Information System (INIS)

    Smock, R.

    1992-01-01

    As we approach the threshold of a new round of ordering of base load generating capacity after a 15-year hiatus, power pant owners are taking a long, hard look at construction. The last round of base load construction was plagued with construction cost overruns and delays. Billions of dollars in cost overruns, many attributable to construction delays, were not allowed to be placed in utilities' rate bases. Those problems will not be tolerated in the next round. During the past few years the construction climate has changed. Non-utility power producers have demonstrated and ability to build small power plants-including many steam plants burning solid fuels-quickly and at surprisingly low costs. In this paper the cost-plus approach traditionally taken by more utilities, who will lead in the base-load construction phase, is being seriously questioned

  4. Construction cost forecast model : model documentation and technical notes.

    Science.gov (United States)

    2013-05-01

    Construction cost indices are generally estimated with Laspeyres, Paasche, or Fisher indices that allow changes : in the quantities of construction bid items, as well as changes in price to change the cost indices of those items. : These cost indices...

  5. Space construction system analysis. Part 2: Cost and programmatics

    Science.gov (United States)

    Vonflue, F. W.; Cooper, W.

    1980-01-01

    Cost and programmatic elements of the space construction systems analysis study are discussed. The programmatic aspects of the ETVP program define a comprehensive plan for the development of a space platform, the construction system, and the space shuttle operations/logistics requirements. The cost analysis identified significant items of cost on ETVP development, ground, and flight segments, and detailed the items of space construction equipment and operations.

  6. Sustainable construction : towards a strategic approach to construction material management for waste reduction

    OpenAIRE

    Abarca Guerrero, L.; Scheublin, F.J.M.; Egmond - de Wilde De Ligny, van, E.L.C.; Lambert, A.J.D.

    2008-01-01

    The construction sector plays a key role in shaping and developing the built environment. It also has an undisputed and significant impact on it due to the amounts of materials extracted and produced as waste. The construction industry has emphasized to recycling construction waste (CW), however, relatively less emphasis has been paid on construction waste minimization. CW reduction can be achieved through changes in design concepts, material and construction methods selection and material ma...

  7. Schedule and cost reduction of nuclear generating facilities in Ontario study overview

    International Nuclear Information System (INIS)

    Huterer, J.

    1991-01-01

    During the five year period 1985 to 1990, Ontario Hydro conducted a major study with the objective to reduce the cost and construction duration for future nuclear generating facilities in Ontario. This paper reports on the study called Major Projects: Schedule and Cost Reduction Study (SCRS). Ontario Hydro is a public utility with the responsibility for meeting electricity need for the province of Ontario with a population of 9.6 million. In order to adequately address future electricity needs, Ontario Hydro has developed and submitted a demand/supply plan which covers the next 25 years. The SCRS for major projects contributed to this demand/supply plan

  8. Costs of occupational injuries in construction in the United States.

    Science.gov (United States)

    Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong

    2007-11-01

    This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.

  9. Cost reductions for offshore wind power. Exploring the balance between scaling, learning and R and D

    International Nuclear Information System (INIS)

    Van der Zwaan, B.; Rivera-Tinoco, R.; Lensink, S.; Van den Oosterkamp, P.

    2012-01-01

    Offshore wind electricity generation is prospected to increase substantially in the near future at a number of locations, like in the Baltic, Irish and North Sea, and emerge at several others. The global growth of offshore wind technology is likely to be accompanied by reductions in wind park construction costs, both as a result of scaling and learning effects. Since 2005, however, significant cost increases have been observed. A recent surge in commodity prices proves to constitute one of the main drivers of these cost increases. This observation begs the question whether wind turbine manufacturers should return to the laboratory for undertaking R and D that explores the use of alternative materials and bring offshore wind energy closer to competitiveness. It is demonstrated that if one abstracts from material price fluctuations, in particular for metals such as copper and steel, turbine production plus installation cost data publicly available for a series of offshore wind park projects (realized in several European countries since the 1990's) show a cost reduction trend. Hence various other sources of cost increases, such as due to the progressively larger distances from the shore (and correspondingly greater depths at sea) at which wind parks have been (and will be) built, are outshadowed by cost reduction effects. When one expresses the overall cost development for offshore wind energy capacity as an experience curve, a learning rate is found of 3%, which reflects a mixture of economies-of-scale and learning-by-doing mechanisms. Also the impact is quantified on offshore wind power construction costs from the recent tightness in the market for turbine manufacturing and installation services: without the demand-supply response inertia at the origin of this tightness it is estimated that the learning rate would be 5%. Since these learning rates are relatively low - in comparison to those observed for other technologies, and in view of the high current capacity

  10. Systemic cost-effectiveness analysis of food hazard reduction

    DEFF Research Database (Denmark)

    Jensen, Jørgen Dejgård; Lawson, Lartey Godwin; Lund, Mogens

    2015-01-01

    stage are considered. Cost analyses are conducted for different risk reduction targets and for three alternative scenarios concerning the acceptable range of interventions. Results demonstrate that using a system-wide policy approach to risk reduction can be more cost-effective than a policy focusing...

  11. Measuring the environmental costs of tidal power plant construction: A choice experiment study

    International Nuclear Information System (INIS)

    Lee, Joo-Suk; Yoo, Seung-Hoon

    2009-01-01

    Korea is considering the construction of a tidal power plant (TPP) at Garolim Bay. However, as the construction of the Garolim TPP (GTPP) is expected to entail some environmental damage, it has become an increasingly important topic for public debate. Using a choice experiment (CE) approach, this study attempts to measure the economic cost that results from the environmental damage caused by the construction of GTPP. The CE is used to measure the environmental costs of individual attributes, including the reduction in the area of the tidal flat, the degradation of seawater quality, and the destruction of marine life. The results indicate that the annual willingness to pay (WTP) per household for mitigating the environmental damage that results from the worst-possible situation in relation to the present situation is about 96,042 Korean won (USD 101.1) in the seven biggest cities (off-site regions) and 18,584 Korean won (USD 19.6) in Seosan and Taean (on-site regions). This study is expected to provide policy-makers with quantitative information that will be useful to decide whether or not GTPP should be constructed.

  12. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  13. Analysis of Trends in Housing Construction Cost in Nigeria from ...

    African Journals Online (AJOL)

    The upward trends in housing construction costs have been a major issue in the economy as a whole. The research uses typical 3 - bedroom bungalow in Lagos to analyze the trends in housing construction cost from 2000 to 2009. The basic question for this research is whether the inflation in housing construction costs ...

  14. Economic feasibility of surface flow constructed (SFCW) wetlands for reduction of water pollution from agricultural fields in Denmark

    DEFF Research Database (Denmark)

    Gachango, Florence Gathoni; Pedersen, Søren Marcus; Kjaergaard, Charlotte

    2014-01-01

    Constructed wetlands have been proposed as cost effective and more targeted technologies in the reduction of nitrogen and phosphorous water pollution in drainage losses from agricultural fields in Denmark. Using two pig farms and one dairy farm situated in a pumped lowland catchment as study cases...

  15. Construction of a low-cost luximeter

    Science.gov (United States)

    Pedroso, L. S.; de Macedo, J. A.; de Araújo, M. S. T.; Voelzke, M. R.

    2016-04-01

    This paper proposes the construction of an electronic instrument called digital luximeter, combining simplicity and low cost, making it simpler and cheaper than those on the market. Its construction tends to facilitate dissemination and access to this type of measuring instrument between high school teachers and educational institutions, making it ideal to be a science lab.

  16. Belowground advantages in construction cost facilitate a cryptic plant invasion.

    Science.gov (United States)

    Caplan, Joshua S; Wheaton, Christine N; Mozdzer, Thomas J

    2014-04-30

    The energetic cost of plant organ construction is a functional trait that is useful for understanding carbon investment during growth (e.g. the resource acquisition vs. tissue longevity tradeoff), as well as in response to global change factors like elevated CO2 and N. Despite the enormous importance of roots and rhizomes in acquiring soil resources and responding to global change, construction costs have been studied almost exclusively in leaves. We sought to determine how construction costs of aboveground and belowground organs differed between native and introduced lineages of a geographically widely dispersed wetland plant species (Phragmites australis) under varying levels of CO2 and N. We grew plants under ambient and elevated atmospheric CO2, as well as under two levels of soil nitrogen. We determined construction costs for leaves, stems, rhizomes and roots, as well as for whole plants. Across all treatment conditions, the introduced lineage of Phragmites had a 4.3 % lower mean rhizome construction cost than the native. Whole-plant construction costs were also smaller for the introduced lineage, with the largest difference in sample means (3.3 %) occurring under ambient conditions. In having lower rhizome and plant-scale construction costs, the introduced lineage can recoup its investment in tissue construction more quickly, enabling it to generate additional biomass with the same energetic investment. Our results suggest that introduced Phragmites has had an advantageous tissue investment strategy under historic CO2 and N levels, which has facilitated key rhizome processes, such as clonal spread. We recommend that construction costs for multiple organ types be included in future studies of plant carbon economy, especially those investigating global change. Published by Oxford University Press on behalf of the Annals of Botany Company.

  17. Cost-derived indices for building design and construction ...

    African Journals Online (AJOL)

    Also as multiples of gfi, substructure cost index, sci and roofing cost index, rci could predict componental costs of substructure and roofing for phased development purposes. Keywords: Cost Indices, Building Design, Building Construction Journal of Modeling, Design and Management of Engineering Systems, Vol.

  18. New technologies for lower-cost design and construction of new nuclear power plants. Annex 20

    International Nuclear Information System (INIS)

    Ritterbusch, S.E.; Bryan, R.E.; Harmon, D.L.

    2002-01-01

    Electric Power Research Institute studies indicate that in order to be competitive with gas-fired electric power plant capital costs, new nuclear plant capital cost in the USA must be decreased by at least 35% to 40% relative to costs of some Advanced Light Water Reactors designed in the early 1990s. To address this need, the U. S. Department of Energy is sponsoring three separate projects under its Nuclear Energy Research Initiative. These projects are the Risk-Informed Assessment of Regulatory and Design Requirements for Future Nuclear Power Plants, the Smart Equipment Nuclear Power Plant Program, and the Design, Procure, Construct, Install and Test Program. The goal of the Design-Construction program is reduction of the complete nuclear plant design-procure-construct-install-test cycle schedule and cost. A 3D plant model was combined with a construction schedule to produce a 4D visualization of plant construction, which was then used to analyze plant construction methods. Insights include the need for concurrent engineering, a plant-wide central database, and use of the World-Wide WEB. The goal of Smart Equipment program is to design, develop, and evaluate the methods for implementing smart equipment and predictive maintenance technology. 'Smart' equipment means components and systems that are instrumented and monitored to detect incipient failures in order to improve their reliability. The resulting smart equipment methods will be combined with a more risk-informed regulatory approach to allow plant designers to (1) simplify designs without compromising overall reliability and safety and (2) maintain more reliable plants at lower cost. Initial results show that rotating equipment such as charging pumps would benefit most from smart instrumentation and that the technique of Bayesian Belief Networks would be most appropriate for providing input to a health monitoring system. (author)

  19. Cost diviation in road construction projects: The case of Palestine

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2012-02-01

    Full Text Available This paper investigates the statistical relationship between actual and estimated cost of road construction projects using data from road construction projects awarded in the West Bank in Palestine over the years 2004–2008. The study is based on a sample of 169 road construction projects. Based on this data, regression models are developed. The findings reveal that 100% of projects suffer from cost diverge, it is found that 76% of projects have cost under estimation while 24% have cost over estimation. The discrepancy between estimated and actual cost has an average of 14.6%, ranging from -39% to 98%. The relation between the project size (length and width and the cost diverge is discussed.

  20. Costs, emissions reductions, and vehicle repair: evidence from Arizona.

    Science.gov (United States)

    Ando, A; McConnell, V; Harrington, W

    2000-04-01

    The Arizona inspection and maintenance (I/M) program provides one of the first opportunities to examine the costs and effectiveness of vehicle emission repair. This paper examines various aspects of emission reductions, fuel economy improvements, and repair costs, drawing data from over 80,000 vehicles that failed the I/M test in Arizona between 1995 and the first half of 1996. We summarize the wealth of data on repair from the Arizona program and highlight its limitations. Because missing or incomplete cost information has been a serious shortcoming for the evaluation of I/M programs, we develop a method for estimating repair costs when they are not reported. We find surprising evidence that almost one quarter of all vehicles that take the I/M test are never observed to pass the test. Using a statistical analysis, we provide some information about the differences between the vehicles that pass and those that do not. Older, more polluting vehicles are much more likely never to pass the I/M test, and their expected repair costs are much higher than those for newer cars. This paper summarizes the evidence on costs and emission reductions in the Arizona program, comparing costs and emissions reductions between cars and trucks. Finally, we examine the potential for more cost-effective repair, first through an analysis of tightening I/M cut points and then by calculating the cost savings of achieving different emission reduction goals when the most cost-effective repairs are made first.

  1. Analyses on Cost Reduction and CO2 Mitigation by Penetration of Fuel Cells to Residential Houses

    Science.gov (United States)

    Aki, Hirohisa; Yamamoto, Shigeo; Kondoh, Junji; Murata, Akinobu; Ishii, Itaru; Maeda, Tetsuhiko

    This paper presents analyses on the penetration of polymer electrolyte fuel cells (PEFC) into a group of 10 residential houses and its effects of CO2 emission mitigation and consumers’ cost reduction in next 30 years. The price is considered to be reduced as the penetration progress which is expected to begin in near future. An experimental curve is assumed to express the decrease of the price. Installation of energy interchange systems which involve electricity, gas and hydrogen between a house which has a FC and contiguous houses is assumed to utilize both electricity and heat more efficiently, and to avoid start-stop operation of fuel processor (reformer) as much as possible. A multi-objective model which considers CO2 mitigation and consumers’ cost reduction is constructed and provided a Pareto optimum solution. A solution which simultaneously realizes both CO2 mitigation and consumers’ cost reduction appeared in the Pareto optimum solution. Strategies to reduce CO2 emission and consumers’ cost are suggested from the results of the analyses. The analyses also revealed that the energy interchange systems are effective especially in the early stage of the penetration.

  2. Harm reduction in U.S. tobacco control: Constructions in textual news media.

    Science.gov (United States)

    Eversman, Michael H

    2015-06-01

    U.S. tobacco control has long emphasized abstinence, yet quitting smoking is hard and cessation rates low. Tobacco harm reduction alternatives espouse substituting cigarettes with safer nicotine and tobacco products. Policy shifts embracing tobacco harm reduction have increased media attention, yet it remains controversial. Discourse theory posits language as fluid, and socially constructed meaning as neither absolute nor neutral, elevating certain views over others while depicting "discursive struggle" between them. While an abstinence-based framework dominates tobacco policy, discourse theory suggests constructions of nicotine and tobacco use can change, for example by positioning tobacco harm reduction more favorably. Textual discourse analysis was used to explore constructions of tobacco harm reduction in 478 (308 original) U.S. textual news media articles spanning 1996-2014. Using keyword database sampling, retrieved articles were analyzed first as discrete recording units and then to identify emergent thematic content. Constructions of tobacco harm reduction shifted over this time, revealing tension among industry and policy interests through competing definitions of tobacco harm reduction, depictions of its underlying science, and accounts of regulatory matters including tobacco industry support for harm reduction and desired marketing and taxation legislation. Heightened salience surrounding tobacco harm reduction and electronic cigarettes suggests their greater acceptance in U.S. tobacco control. Various media depictions construct harm reduction as a temporary means to cessation, and conflict with other constructions of it that place no subjective value on continued "safer" tobacco/nicotine use. Constructions of science largely obscure claims of the veracity of tobacco harm reduction, with conflict surrounding appropriate public health benchmarks for tobacco policy and health risks of nicotine use. Taxation policies and e-cigarette pricing relative to

  3. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  4. Multiple cost criteria for occupational dose reduction

    International Nuclear Information System (INIS)

    James, J.Z.

    1983-01-01

    This paper describes a simple, feasible procedure for deciding if a proposed dose reduction measure is justified under ALARA, based on engineering economic principles of project feasibility analysis. Particular attention is given to the fixing of cost criteria: the importance of melding disparate objectives into a single parameter, and the distinction between a cost criterion and a cost consideration. (author)

  5. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  6. Further Cost Reduction of Battery Manufacturing

    Directory of Open Access Journals (Sweden)

    Amir A. Asif

    2017-06-01

    Full Text Available The demand for batteries for energy storage is growing with the rapid increase in photovoltaics (PV and wind energy installation as well as electric vehicle (EV, hybrid electric vehicle (HEV and plug-in hybrid electric vehicle (PHEV. Electrochemical batteries have emerged as the preferred choice for most of the consumer product applications. Cost reduction of batteries will accelerate the growth in all of these sectors. Lithium-ion (Li-ion and solid-state batteries are showing promise through their downward price and upward performance trends. We may achieve further performance improvement and cost reduction for Li-ion and solid-state batteries through reduction of the variation in physical and electrical properties. These properties can be improved and made uniform by considering the electrical model of batteries and adopting novel manufacturing approaches. Using quantum-photo effect, the incorporation of ultra-violet (UV assisted photo-thermal processing can reduce metal surface roughness. Using in-situ measurements, advanced process control (APC can help ensure uniformity among the constituent electrochemical cells. Industrial internet of things (IIoT can streamline the production flow. In this article, we have examined the issue of electrochemical battery manufacturing of Li-ion and solid-state type from cell-level to battery-level process variability, and proposed potential areas where improvements in the manufacturing process can be made. By incorporating these practices in the manufacturing process we expect reduced cost of energy management system, improved reliability and yield gain with the net saving of manufacturing cost being at least 20%.

  7. Implementation of activity-based costing (ABC) to drive cost reduction efforts in a semiconductor manufacturing operation

    Science.gov (United States)

    Naguib, Hussein; Bol, Igor I.; Lora, J.; Chowdhry, R.

    1994-09-01

    This paper presents a case study on the implementation of ABC to calculate the cost per wafer and to drive cost reduction efforts for a new IC product line. The cost reduction activities were conducted through the efforts of 11 cross-functional teams which included members of the finance, purchasing, technology development, process engineering, equipment engineering, production control, and facility groups. The activities of these cross functional teams were coordinated by a cost council. It will be shown that these activities have resulted in a 57% reduction in the wafer manufacturing cost of the new product line. Factors contributed to successful implementation of an ABC management system are discussed.

  8. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  9. Safety cost management in construction companies: A proposal classification.

    Science.gov (United States)

    López-Alonso, M; Ibarrondo-Dávila, M P; Rubio, M C

    2016-06-16

    Estimating health and safety costs in the construction industry presents various difficulties, including the complexity of cost allocation, the inadequacy of data available to managers and the absence of an accounting model designed specifically for safety cost management. Very often, the costs arising from accidents in the workplace are not fully identifiable due to the hidden costs involved. This paper reviews some studies of occupational health and safety cost management and proposes a means of classifying these costs. We conducted an empirical study in which the health and safety costs of 40 construction worksites are estimated. A new classification of the health and safety cost and its categories is proposed: Safety and non-safety costs. The costs of the company's health and safety policy should be included in the information provided by the accounting system, as a starting point for analysis and control. From this perspective, a classification of health and safety costs and its categories is put forward.

  10. Cost-effectiveness of reduction of off-site dose

    International Nuclear Information System (INIS)

    McGrath, J.J.; Macphee, R.; Arbeau, N.; Miskin, J.; Scott, C.K.; Winters, E.

    1988-03-01

    Since the early 1970's, nuclear power plants have been designed and operated with a target of not releasing more than one percent of the licensed limits (derived emission limits) in liquid and gaseous effluents. The AECB initiated this study of the cost-effectiveness of the reduction of off-site doses as part of a review to determine if further measures to reduce off-site doses might be reasonably achievable. Atlantic Nuclear has estimated the cost of existing technology options that can be applied for a further reduction of radioactive effluents from future CANDU nuclear power plants. Detritiation, filtration, ion exchange and evaporation are included in the assessment. The costs are presented in 1987 Canadian dollars, and include capital and operating costs for a reference 50 year plant life. Darlington NGS and Point Lepreau NGS are the reference nuclear power plant types and locations. The effect resulting from the hypothetical application of each technology has been calculated as the resulting reduction in world collective radiation dose detriment. The CSA N288.1 procedure was used for local pathway analysis and the global dispersion model developed by the NEA (OECD) group of experts was used for dose calculations. The reduction in the 'collective effective dose equivalent commitment' was assumed to exist for 10,000 years, the expected life-span of solid waste repositories. No attempt was made to model world population dynamics. The collective dose reductions were calculated for a nominal world population of 10 billion persons. The estimated cost and effect of applying the technology options are summarized in a tabular form for input to further consideration of 'reasonably achievable off-site dose levels'

  11. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Li, Ming; Wu, Guangdong

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  12. Probabilistic cost estimating of nuclear power plant construction projects

    International Nuclear Information System (INIS)

    Finch, W.C.; Perry, L.W.; Postula, F.D.

    1978-01-01

    This paper shows how to identify and isolate cost accounts by developing probability trees down to component levels as justified by value and cost uncertainty. Examples are given of the procedure for assessing uncertainty in all areas contributing to cost: design, factory equipment pricing, and field labor and materials. The method of combining these individual uncertainties is presented so that the cost risk can be developed for components, systems and the total plant construction project. Formats which enable management to use the probabilistic cost estimate information for business planning and risk control are illustrated. Topics considered include code estimate performance, cost allocation, uncertainty encoding, probabilistic cost distributions, and interpretation. Effective cost control of nuclear power plant construction projects requires insight into areas of greatest cost uncertainty and a knowledge of the factors which can cause costs to vary from the single value estimates. It is concluded that probabilistic cost estimating can provide the necessary assessment of uncertainties both as to the cause and the consequences

  13. Forecasting Canadian nuclear power station construction costs

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequences of the decision as possible. This understanding must be provided by the evaluation of future situations. A key consideration in an evaluation is the financial component. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A brief review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A database is built and indexes are prepared. Based on these indexes, an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of 40 years are generated and applications (such as alternative scenario forecasts and range forecasts) to uncertainty assessment and/or decision-making are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the first for Canadian NGS constructions. (author)

  14. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  15. Designing to target cost: one approach to design/construction integration

    DEFF Research Database (Denmark)

    Jørgensen, Bo

    2005-01-01

    One approach to a more integrated construction delivery process is the concept of ‘designing to target cost’ of which the first examples of application within a lean construction framework have recently been seen. This paper introduces the main principles of the design to target cost method...... and discusses the applicability of this approach to construction. The low degree of organizational and technical continuity from one construction project to the next limits the applicability of the design for target cost approach when compared to its origin in product development of mass manufactured artefacts....... It can be argued that design to target cost may also provide a frame for developing the supply chain towards better coordination and collaboration. Thus methods of design to target cost may serve to facilitate the development of a more integrated supply chain....

  16. Construction engineering inspection direct cost survey.

    Science.gov (United States)

    2014-07-01

    The objective of the study was to provide a rationale to Georgia Department of Transportation : (GDOT) for Direct Costs in terms of salary and wages charged by qualified independent : contractors performing Construction Engineering Inspection (CEI) s...

  17. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  18. Categorization of potential project cost overrun factors in construction industry

    Science.gov (United States)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  19. Technique for Reduction of Environmental Pollution from Construction Wastes

    Science.gov (United States)

    Bakaeva, N. V.; Klimenko, M. Y.

    2017-11-01

    The results of the research on the negative impact construction wastes have on the urban environment and construction ecological safety are described. The research results are based on the statistical data and indicators calculated with the use of environmental pollution assessment in the restoration system of urban buildings technical conditions. The technique for the reduction of environmental pollution from construction wastes is scientifically based on the analytic summary of scientific and practical results for ecological safety ensuring at major overhaul and current repairs (reconstruction) of the buildings and structures. It is also based on the practical application of the probability theory method, system analysis and disperse system theory. It is necessary to execute some stages implementing the developed technique to reduce environmental pollution from construction wastes. The stages include various steps starting from information collection to the system formation with optimum performance characteristics which are more resource saving and energy efficient for the accumulation of construction wastes from urban construction units. The following tasks are solved under certain studies: basic data collection about construction wastes accumulation; definition and comparison of technological combinations at each system functional stage intended for the reduction of construction wastes discharge into the environment; assessment criteria calculation of resource saving and energy efficiency; optimum working parameters of each implementation stage are created. The urban construction technique implementation shows that the resource saving criteria are from 55.22% to 88.84%; potential of construction wastes recycling is 450 million tons of construction damaged elements (parts).

  20. 23 CFR 140.907 - Overhead and indirect construction costs.

    Science.gov (United States)

    2010-04-01

    ... accounting principles; (2) The costs included in the distribution are limited to costs actually incurred by...), part 31, Contract Cost Principles and Procedures, relating to contracts with commercial organizations... 23 Highways 1 2010-04-01 2010-04-01 false Overhead and indirect construction costs. 140.907...

  1. Low-cost satellite mechanical design and construction

    Science.gov (United States)

    Boisjolie-Gair, Nathaniel; Straub, Jeremy

    2017-05-01

    This paper presents a discussion of techniques for low-cost design and construction of a CubeSat mechanical structure that can serve as a basis for academic programs and a starting point for government, military and commercial large-scale sensing networks, where the cost of each node must be minimized to facilitate system affordability and lower the cost and associated risk of losing any node. Spacecraft Design plays a large role in manufacturability. An intentionally simplified mechanical design is presented which reduces machining costs, as compared to more intricate designs that were considered. Several fabrication approaches are evaluated relative to the low-cost goal.

  2. A Semantics-Based Approach to Construction Cost Estimating

    Science.gov (United States)

    Niknam, Mehrdad

    2015-01-01

    A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…

  3. A system dynamics-based environmental performance simulation of construction waste reduction management in China.

    Science.gov (United States)

    Ding, Zhikun; Yi, Guizhen; Tam, Vivian W Y; Huang, Tengyue

    2016-05-01

    A huge amount of construction waste has been generated from increasingly higher number of construction activities than in the past, which has significant negative impacts on the environment if they are not properly managed. Therefore, effective construction waste management is of primary importance for future sustainable development. Based on the theory of planned behaviors, this paper develops a system dynamic model of construction waste reduction management at the construction phase to simulate the environmental benefits of construction waste reduction management. The application of the proposed model is shown using a case study in Shenzhen, China. Vensim is applied to simulate and analyze the model. The simulation results indicate that source reduction is an effective waste reduction measure which can reduce 27.05% of the total waste generation. Sorting behaviors are a premise for improving the construction waste recycling and reuse rates which account for 15.49% of the total waste generated. The environmental benefits of source reduction outweigh those of sorting behaviors. Therefore, to achieve better environmental performance of the construction waste reduction management, attention should be paid to source reduction such as low waste technologies and on-site management performance. In the meantime, sorting behaviors encouragement such as improving stakeholders' waste awareness, refining regulations, strengthening government supervision and controlling illegal dumping should be emphasized. Copyright © 2016 Elsevier Ltd. All rights reserved.

  4. Quality Cost in the Construction Industry ' Preliminary Findings in Malaysia

    Directory of Open Access Journals (Sweden)

    Mukhtar Che Ali

    2010-06-01

    Full Text Available One of the key areas being emphasis in ISO 9001 Quality Management System (QMS is performance measurement towards continual improvement. Among the primary measuring tools is quality cost approach. Quality cost has been well practice in manufacturing sector but slowly gain its importance in construction industry. In fact Project Management Body of Knowledge (PMBOK has reckoned quality cost as one of the tool and technique in few of its management processes. In view of such circumstances that has prompted an effort to undertake a study to ascertain the level of knowledge and practice on quality cost in Malaysian construction landscape. The targeted group of respondents was the personnel in the project management team. Capitalizing Construction Industry Development Board (CIDB National Electronic Tendering Initiatives (NETI road shows which were held in year 2007 throughout the country, the author was able to garner 263 respondents representing the project management team. Subsequently the data gathered from the completed forms were analyzed using Statistical Package for Social Science (SPSS software. General findings indicated that the level of knowledge and practice on quality cost among the project management team were relatively low. One of the main contributing factors was poor knowledge in the area related to quality cost. Despite of such scenario most of the respondents showed their interest in acquiring knowledge in the field of quality cost. Hence quality cost approach is at the infancy stage in Malaysian construction industry.

  5. Prevailing Wage Regulations and School Construction Costs: Evidence from British Columbia.

    Science.gov (United States)

    Bilginsoy, Cihan; Philips, Peter

    2000-01-01

    Examines effects of prevailing wage laws on school construction costs, using final cost data from six British Columbia school districts. When controlling for factors such as construction business cycle, number of competitors, and school type, there was no significant unit cost change following the Skill Development and Fair Wage Policy Act.…

  6. Marginal cost curves for water footprint reduction in irrigated agriculture: guiding a cost-effective reduction of crop water consumption to a permit or benchmark level

    Directory of Open Access Journals (Sweden)

    A. D. Chukalla

    2017-07-01

    Full Text Available Reducing the water footprint (WF of the process of growing irrigated crops is an indispensable element in water management, particularly in water-scarce areas. To achieve this, information on marginal cost curves (MCCs that rank management packages according to their cost-effectiveness to reduce the WF need to support the decision making. MCCs enable the estimation of the cost associated with a certain WF reduction target, e.g. towards a given WF permit (expressed in m3  ha−1 per season or to a certain WF benchmark (expressed in m3  t−1 of crop. This paper aims to develop MCCs for WF reduction for a range of selected cases. AquaCrop, a soil-water-balance and crop-growth model, is used to estimate the effect of different management packages on evapotranspiration and crop yield and thus the WF of crop production. A management package is defined as a specific combination of management practices: irrigation technique (furrow, sprinkler, drip or subsurface drip; irrigation strategy (full or deficit irrigation; and mulching practice (no, organic or synthetic mulching. The annual average cost for each management package is estimated as the annualized capital cost plus the annual costs of maintenance and operations (i.e. costs of water, energy and labour. Different cases are considered, including three crops (maize, tomato and potato; four types of environment (humid in UK, sub-humid in Italy, semi-arid in Spain and arid in Israel; three hydrologic years (wet, normal and dry years and three soil types (loam, silty clay loam and sandy loam. For each crop, alternative WF reduction pathways were developed, after which the most cost-effective pathway was selected to develop the MCC for WF reduction. When aiming at WF reduction one can best improve the irrigation strategy first, next the mulching practice and finally the irrigation technique. Moving from a full to deficit irrigation strategy is found to be a no-regret measure: it reduces the WF

  7. Marginal cost curves for water footprint reduction in irrigated agriculture: guiding a cost-effective reduction of crop water consumption to a permit or benchmark level

    Science.gov (United States)

    Chukalla, Abebe D.; Krol, Maarten S.; Hoekstra, Arjen Y.

    2017-07-01

    Reducing the water footprint (WF) of the process of growing irrigated crops is an indispensable element in water management, particularly in water-scarce areas. To achieve this, information on marginal cost curves (MCCs) that rank management packages according to their cost-effectiveness to reduce the WF need to support the decision making. MCCs enable the estimation of the cost associated with a certain WF reduction target, e.g. towards a given WF permit (expressed in m3  ha-1 per season) or to a certain WF benchmark (expressed in m3  t-1 of crop). This paper aims to develop MCCs for WF reduction for a range of selected cases. AquaCrop, a soil-water-balance and crop-growth model, is used to estimate the effect of different management packages on evapotranspiration and crop yield and thus the WF of crop production. A management package is defined as a specific combination of management practices: irrigation technique (furrow, sprinkler, drip or subsurface drip); irrigation strategy (full or deficit irrigation); and mulching practice (no, organic or synthetic mulching). The annual average cost for each management package is estimated as the annualized capital cost plus the annual costs of maintenance and operations (i.e. costs of water, energy and labour). Different cases are considered, including three crops (maize, tomato and potato); four types of environment (humid in UK, sub-humid in Italy, semi-arid in Spain and arid in Israel); three hydrologic years (wet, normal and dry years) and three soil types (loam, silty clay loam and sandy loam). For each crop, alternative WF reduction pathways were developed, after which the most cost-effective pathway was selected to develop the MCC for WF reduction. When aiming at WF reduction one can best improve the irrigation strategy first, next the mulching practice and finally the irrigation technique. Moving from a full to deficit irrigation strategy is found to be a no-regret measure: it reduces the WF by reducing water

  8. A systematic way for the cost reduction of density fitting methods

    International Nuclear Information System (INIS)

    Kállay, Mihály

    2014-01-01

    We present a simple approach for the reduction of the size of auxiliary basis sets used in methods exploiting the density fitting (resolution of identity) approximation for electron repulsion integrals. Starting out of the singular value decomposition of three-center two-electron integrals, new auxiliary functions are constructed as linear combinations of the original fitting functions. The new functions, which we term natural auxiliary functions (NAFs), are analogous to the natural orbitals widely used for the cost reduction of correlation methods. The use of the NAF basis enables the systematic truncation of the fitting basis, and thereby potentially the reduction of the computational expenses of the methods, though the scaling with the system size is not altered. The performance of the new approach has been tested for several quantum chemical methods. It is demonstrated that the most pronounced gain in computational efficiency can be expected for iterative models which scale quadratically with the size of the fitting basis set, such as the direct random phase approximation. The approach also has the promise of accelerating local correlation methods, for which the processing of three-center Coulomb integrals is a bottleneck

  9. Fusion reactor cost reductions by employing non-nuclear grade components

    International Nuclear Information System (INIS)

    Bourque, R.F.; Maya, I.; Schultz, K.R.; Sonn, D.L.; Wise, R.K.

    1987-09-01

    The Cascade inertial confinement fusion reactor fits the requirements of low radioactive inventories and inherent safety and is therefore a candidate for non-nuclear construction throughout. This reactor consists of a rotating blanket of ceramic granules that absorb the energy from D-T target explosions occurring along the rotational axis. Laser energy is beamed in axially from both ends. Two cost estimates were made for an 815 MWe Cascade power plant. One was based on an ''all conventional'' plant, which is constructed and costed using well-established, conventional fossil power plant methods. The second was a ''nuclear plus conventional'' design, constructed and costed using a combination of fossil and fission reactor plant methods and standards that would be typical of advanced fission reactors. The total capital requirements for the ''all conventional'' construction plant were estimated in 1985 dollars at $1490 M, including indirect costs. Similarly, the ''nuclear plus conventional'' construction plant was estimated at $1940 M. The savings of $450 M (23%) represents strictly the difference between Cascade ICF power plants designed and constructed to nuclear safety-related requirements versus all non-nuclear. This example clearly shows that, if fusion plants can take advantage of low activation materials and inherent safety features to eliminate the need for nuclear-related expenses, then such plants may have economic advantages over nuclear-grade systems. 13 refs., 1 fig., 5 tabs

  10. Reduction of mesqa improvement costs

    Directory of Open Access Journals (Sweden)

    Mohamed Ahmed Saad ElFetyany

    2017-10-01

    Results show that using the revised approach brings down the cost of mesqa improvement from nearly 10,000LE/fed at present to about 6000LE/fed. These reductions based on the analyses of different mesqa modelling through the adoption of certain parameters such as feasibility of the revised design, effective application of continuous flow for water distribution, and downsizing of the capacity of improved mesqas.

  11. Analysis of Cost of Rework on Time and Cost Performance of Building Construction Projects in Abuja, Nigeria

    Directory of Open Access Journals (Sweden)

    Emmanuel Chidiebere Eze

    2018-01-01

    Full Text Available Rework is a menace that leads to undesired and unnecessary loss of efforts, it degrades project cost and schedule performance of construction projects, both at design and construction phases. This study therefore, analyzed the impact of cost of rework on time and cost performance of building construction projects in Nigerian, using selected commercial building project within the country’s capital. A pro forma was adopted for gathering data on rework cost, project cost and time of selected building projects, while structured questionnaire was used to collect information on the likely measures for reducing rework incidences from construction professionals that were involved in the delivery of the identified projects. Regression analysis, relative importance index and Kruskal-Walis test were employed for data analysis. The study revealed a significant relationship between the cost of rework and initial and final project cost of delivering commercial buildings, as an average of 3.53% impact on the initial project cost, 46.60% contribution to cost overrun, and p-value of 0.000 was observed on all assessed projects. For the project delivery time, a significant relationship between the cost of rework and initial and final project duration, as an average of 7.35% impact on the initial delivery time, extra 19 days and p-value of 0.000 was observed on all assessed projects. Team building and education, management commitment, employee involvement, were some of the best possible measures to minimized rework problems.

  12. Assessment of Cost Variation in Solid and Hollow Floor Construction in Lagos State

    Directory of Open Access Journals (Sweden)

    Oluwaseun Sunday Dosumu

    2013-12-01

    Full Text Available The differences in construction methods between different forms of slabs construction tend to result into variation in the cost of the slabs for any building project. Thus, this study aims at assessing the variation in construction cost among various construction methods available for hollow and solid floors in construction projects within Lagos State. The research design for this study was a survey design approach and the population of the study are active professionals (Architects, Civil Engineers, Builders, Quantity Surveyors, Consultant and contractors because they are the major participants in the construction activities of the construction industry in Lagos State, Nigeria. The research is based on 46 returned questionnaires out of the 60 that was administered. The data from the questionnaires were analyzed using descriptive tools such as frequencies, percentage and mean values. The hypotheses were tested with paired sample t-test and it was found that the system or method of slab construction well known to the respondents is cast in situ, precast and semi-precast. The study also shows that the cost of in-situ solid slabs are higher than that of hollow slab which is an indication that solid slab construction is more expensive than hollow slab construction provided the hollow slab is a one-way hollow floor and not waffle floor. In pre cast solid slab construction the cost of transportation of units to sites, cost of expertise required in the construction process and the cost of fabrication off site are the three highest and most expensive aspects of precast solid slab while cost of erection and placement and the cost of grouting and topping if required are less expensive. Therefore there is difference in the cost of construction between the solid and hollow slabs but the difference is not appreciable. The study's major recommendation is that, adequate and careful analysis must be done in the choice of floor system being adopted for any

  13. Cost-effective reduction of fine primary particulate matter emissions in Finland

    International Nuclear Information System (INIS)

    Karvosenoja, Niko; Klimont, Zbigniew; Tohka, Antti; Johansson, Matti

    2007-01-01

    Policies to reduce adverse health impacts of fine particulate matter (PM 2.5 ) require information on costs of abatement and associated costs. This paper explores the potential for cost-efficient control of anthropogenic primary PM 2.5 emissions in Finland. Based on a Kyoto-compliant energy projection, two emission control scenarios for 2020 were developed. 'Baseline' assumes implementation of PM controls in compliance with existing legislation. 'Reduction' assumes ambitious further reductions. Emissions for 2020 were estimated at 26 and 18.6 Gg a -1 for 'Baseline' and 'Reduction', respectively. The largest abatement potential, 3.0 Gg a -1 , was calculated for power plants and industrial combustion. The largest potential with marginal costs below 5000 Euro MG(PM 2.5 ) -1 was for domestic wood combustion, 1.7 Gg a -1 . For traffic the potential was estimated at 1.0 Gg a -1 , but was associated with high costs. The results from this paper are used in the policy-driven national integrated assessment modeling that explores cost-efficient reductions of the health impacts of PM

  14. User costs as one of main advantages of precast concrete application in highway construction

    Science.gov (United States)

    Tomek, Radan

    2017-09-01

    Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.

  15. Some problems of NPP construction base improvement

    International Nuclear Information System (INIS)

    Movchan, S.V.

    1984-01-01

    NPP construction bases are characterized by high cost of construction and large area. Duration of base construction makes up 3-4 years, labour contents for their erection constitute 600-900 thousand man-days. Delays in organizing functional base services essentially decelerate construction rates of the main NPP buildings. Maximum joining of separate buildings by their functional assignment and structural peculiarities, wide application of container buildings, partial utilization of permanent buildings of production centre for construction needs; transition to new organizational form of construction based on industrial production of buildings; production of volumetric structural-technological cells with mounted equipment manufactured at specialized plants, mounting NPP components with stock produced cells, consideration of the problem of large power centre creation are necessary for reduction of construction centres, area reduction of cost and duration of their construction

  16. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Directory of Open Access Journals (Sweden)

    Gafurov Andrey

    2018-01-01

    Full Text Available The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the “Project analysis scenario” flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  17. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    Science.gov (United States)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  18. An Environmentally Oriented Constructive Cost Model In Information ...

    African Journals Online (AJOL)

    A model was designed to assist software developers in Nigeria to estimate software effort, duration and cost as a result of the difficulties in understanding the parameters of the traditional Constructive Cost Model II (COCOMO II) , which was designed for a specif ic environment, using Source Lines of Code (SLOC) . Results ...

  19. The ranking of negative-cost emissions reduction measures

    International Nuclear Information System (INIS)

    Taylor, Simon

    2012-01-01

    A flaw has been identified in the calculation of the cost-effectiveness in marginal abatement cost curves (MACCs). The problem affects “negative-cost” emissions reduction measures—those that produce a return on investment. The resulting ranking sometimes favours measures that produce low emissions savings and is therefore unreliable. The issue is important because incorrect ranking means a potential failure to achieve the best-value outcome. A simple mathematical analysis shows that not only is the standard cost-effectiveness calculation inadequate for ranking negative-cost measures, but there is no possible replacement that satisfies reasonable requirements. Furthermore, the concept of negative cost-effectiveness is found to be unsound and its use should be avoided. Among other things, this means that MACCs are unsuitable for ranking negative-cost measures. As a result, MACCs produced by a range of organizations including UK government departments may need to be revised. An alternative partial ranking method has been devised by making use of Pareto optimization. The outcome can be presented as a stacked bar chart that indicates both the preferred ordering and the total emissions saving available for each measure without specifying a cost-effectiveness. - Highlights: ► Marginal abatement cost curves (MACCs) are used to rank emission reduction measures. ► There is a flaw in the standard ranking method for negative-cost measures. ► Negative values of cost-effectiveness (in £/tC or equivalent) are invalid. ► There may be errors in published MACCs. ► A method based on Pareto principles provides an alternative ranking method.

  20. 19 CFR 351.407 - Calculation of constructed value and cost of production.

    Science.gov (United States)

    2010-04-01

    ... ANTIDUMPING AND COUNTERVAILING DUTIES Calculation of Export Price, Constructed Export Price, Fair Value, and Normal Value § 351.407 Calculation of constructed value and cost of production. (a) Introduction. This... 19 Customs Duties 3 2010-04-01 2010-04-01 false Calculation of constructed value and cost of...

  1. The Role of Logistics in Practical Levelized Cost of Energy Reduction Implementation and Government Sponsored Cost Reduction Studies: Day and Night in Offshore Wind Operations and Maintenance Logistics

    DEFF Research Database (Denmark)

    Poulsen, Thomas; Hasager, Charlotte Bay; Jensen, Christian Munk

    2017-01-01

    This paper reveals that logistics make up at least 17% of annual operational expenditure costs for offshore wind farms. Annual operational expenditure is found to vary by a factor of 9.5, making its share of levelized cost of energy for offshore wind range from 13% to 57%. These are key findings...... contrast to the shore-based office personnel who develop studies directing cost reduction efforts. This paper details the company motivation to join industry-wide cost reduction initiatives. A business case for offshore wind operations and maintenance logistics yielding 1% savings in levelized cost...... of a 20-month research project targeting cost reduction initiatives for offshore wind systems. The findings reveal that cost-out measures are difficult to implement due to cultural differences. Implementation efforts are rendered by personnel located offshore in a harsh sea environment which is in stark...

  2. Progress in resolving construction issues on nuclear projects

    International Nuclear Information System (INIS)

    Reedy, R.F.

    1985-01-01

    The cost of nuclear plant construction in the United States can be drastically reduced. Progress is being made in the reduction of construction costs and with continuing effort much more can be done. The easiest way to attack high costs is to eliminate the unnecessary repairs and rework in construction, along with the time consuming evaluations and dispositions, and to use common sense in design practices. By doing this, millions of dollars could easily be cut from the cost of construction of nuclear powerplants

  3. Marginal CO2 reduction cost in ENERGY 2000 development. A socio-economic evaluation of the marginal cost for the alternative reduction methods

    International Nuclear Information System (INIS)

    Maeng, H.

    1995-01-01

    The official Danish environmental plan involves a reduction of CO 2 within the next 30-50 years. This report describes the analysis of socio-economic cost/consequences of marginal CO 2 reduction by means of various technical solution models. Calculations by means of the special program subroutine SAMFOKO are based on energy balance in annual, monthly, daily and hourly scale. Heat and power savings as well as the development of decentralized power plants are considered in the supply model. Socio-economic consequences in form of charges and cost are discussed. (EG)

  4. ANN Based Approach for Estimation of Construction Costs of Sports Fields

    Directory of Open Access Journals (Sweden)

    Michał Juszczyk

    2018-01-01

    Full Text Available Cost estimates are essential for the success of construction projects. Neural networks, as the tools of artificial intelligence, offer a significant potential in this field. Applying neural networks, however, requires respective studies due to the specifics of different kinds of facilities. This paper presents the proposal of an approach to the estimation of construction costs of sports fields which is based on neural networks. The general applicability of artificial neural networks in the formulated problem with cost estimation is investigated. An applicability of multilayer perceptron networks is confirmed by the results of the initial training of a set of various artificial neural networks. Moreover, one network was tailored for mapping a relationship between the total cost of construction works and the selected cost predictors which are characteristic of sports fields. Its prediction quality and accuracy were assessed positively. The research results legitimatize the proposed approach.

  5. Modeling of Construction Cost of Villas in Oman

    Directory of Open Access Journals (Sweden)

    MA Al-Mohsin

    2014-06-01

    Full Text Available In this research, a model for estimating construction cost of villas is presented. The model takes into account four major factors affecting villa's cost, namely: built up area, number of toilets, number of bedrooms and the number of stories. A field survey was conducted to collect information required for such model using data collection form designed by the researchers. Information about 150 villas was collected from six well experienced consultants in the field of villa design and supervision in Oman. Collected data was analyzed to develop suggested model which consists of two main levels of estimate. The first level is at the conceptual design stage where the client presents his/her need of space and basic information about the available plot for construction. The second level of cost estimation is carried out after the preliminary design stage where the client has to decide on the finishes and type of structure. At the second level of estimation, the client should be able to decide whether to precede for construction or not, according to his/her budget. The model is general and can be used anywhere and was validated for accepted degree of confidence using the actual cost of the 112 executed villa projects in Oman. The villas included in this study were owned by clients from both high and low income brackets and had different types of finishing material. The developed equations showed good correlation between the selected variables and the actual cost with R2  = 0.79 in the case of conceptual estimate and R2  = 0.601 for preliminary estimate.

  6. A project management quality cost information system for the construction industry

    OpenAIRE

    Love, PED; Irani, Z

    2003-01-01

    A prototype Project Management Quality Cost System (PROMQACS) was developed to determine quality costs in construction projects. The structure and information requirements that are needed to provide a classification system of quality costs were identified and discussed. The developed system was tested and implemented in two case study construction projects to determine the information and management issues needed to develop PROMQACS into a software program. In addition, the system was used to...

  7. Barriers and Motivations for Construction Waste Reduction Practices in Costa Rica

    Directory of Open Access Journals (Sweden)

    Lilliana Abarca-Guerrero

    2017-12-01

    Full Text Available Low- and middle-income countries lag behind in research that is related to the construction industry and the waste problems that the sector is facing. Literature shows that waste reduction and recycling have received a continuous interest from researchers, but mainly from developed countries. Few reports from low- and middle-income countries are concerned about the reuse of masonry, concrete, and mortar in clay based building ceramics or recycling construction waste, but mostly in relation to concrete aggregates. Furthermore, few authors have described the major barriers and motivations for construction waste reduction. The objective of this paper is to report the findings on a research performed in Costa Rica with the objective to determine the barriers and motivations that the construction sector is facing to improve the management of the construction materials. The study is based on data collected in two phases. During the first phase, a survey was sent via e-mail to 419 main contractors registered at the School Federation of Engineers and Architects (CFIA. The second phase consisted of a focus group discussion with 49 professionals from the construction industry to analyse and validate the findings from the survey. Descriptive statistic methods helped to draw the conclusions. The result of the research is a comprehensive list of observed barriers and motivations for waste reduction practices in the construction sector. These are not only applicable to Costa Rica, but can be used as a guide for similar studies in other low- and middle-income countries.

  8. Canadian nuclear power plant construction cost forecast and analysis

    International Nuclear Information System (INIS)

    Keng, C.W.K.

    1985-01-01

    Because of the huge volume of capital required to construct a modern electric power generating station, investment decisions have to be made with as complete an understanding of the consequence of the decision as possible. This understanding must be provided by the evaluation of the situation to take place in the future. This paper attempts to use an econometric method to forecast the construction costs escalation of a standard Canadian nuclear generating station (NGS). A review of the history of Canadian nuclear electric power is provided. The major components of the construction costs of a Canadian NGS are studied and summarized. A data base is built and indexes are prepared. Based on these indexes an econometric forecasting model is constructed using an apparently new econometric methodology of forecasting modelling. Forecasts for a period of forty years are generated and applications of alternative scenario forecasts and range forecasts to uncertainty assessment are demonstrated. The indexes, the model, and the forecasts and their applications, to the best of the author's knowledge, are the very first ever done for Canadian NGS constructions

  9. The Role of Logistics in Practical Levelized Cost of Energy Reduction Implementation and Government Sponsored Cost Reduction Studies: Day and Night in Offshore Wind Operations and Maintenance Logistics

    Directory of Open Access Journals (Sweden)

    Thomas Poulsen

    2017-04-01

    Full Text Available This paper reveals that logistics make up at least 17% of annual operational expenditure costs for offshore wind farms. Annual operational expenditure is found to vary by a factor of 9.5, making its share of levelized cost of energy for offshore wind range from 13% to 57%. These are key findings of a 20-month research project targeting cost reduction initiatives for offshore wind systems. The findings reveal that cost-out measures are difficult to implement due to cultural differences. Implementation efforts are rendered by personnel located offshore in a harsh sea environment which is in stark contrast to the shore-based office personnel who develop studies directing cost reduction efforts. This paper details the company motivation to join industry-wide cost reduction initiatives. A business case for offshore wind operations and maintenance logistics yielding 1% savings in levelized cost of energy is included on how to expand working hours from daytime to also work at night.

  10. A study on the competitiveness improvement of the OPR1000 through reduction of the construction period

    International Nuclear Information System (INIS)

    Lee, Deuck Soo

    2009-02-01

    Current world's nuclear power plant markets change will provide variety opportunities to the Korean nuclear power plant industries. The economic competitiveness is the most significant issue to utilize the forthcoming 'Renaissance of Nuclear Power' as a chance of exporting OPR1000. To improve the competitiveness of the OPR1000, the capital cost which is the key factor of the generating cost of the nuclear power plant should be reduced. Reduction of the construction period is more important than the design improvement or facility change regarding capital cost perspectives. The aim of this study, therefore, is to introduce the parallel installation method for reducing the construction period to achieve the economic competitiveness. The parallel installation path was selected among critical paths by analyzing the construction schedules of the nuclear power plants built in Korea. Reactor Coolant Loop Installation and Reactor Vessel Internal Installation were selected for the parallel installation method in this study. Conventional installation method installs reactor vessel internal after finishing reactor coolant loop installation. Therefore it needs about twenty (20) months from the reactor vessel settings to the completion of the reactor vessel internal installation. The parallel installation methodology proposed in this study can reduce the construction period about two (2) months by installing reactor vessel internals in parallel with the welding process of the cross-over leg between the steam generator and the reactor coolant pump. ANSYS Codes was utilized to show the deformation impacts on the reactor vessel caused by the shrinkage force imposed by the welding process of the cross-over leg. The code analysis results lead the deformation impact is negligible. And it confirms the parallel installation of the reactor vessel internal with the cross-over leg can be applied for the OPR1000 construction. The economic improvement by the parallel installation was also

  11. Identifying factors causing cost overrun of the construction projects ...

    Indian Academy of Sciences (India)

    Swapnil P Wanjari

    Cost overrun in India; ANOVA; factor analysis; construction projects. 1. Introduction ... gramme Implementation in India [2], projects of public .... case if a respondent never came across of such factor. ..... The co-relation matrix for variables of cost overruns was ..... There are various problems observed due to communication.

  12. Cost effective snubber reduction program for nuclear power plants

    International Nuclear Information System (INIS)

    Adams, T.M.; Antaki, G.A.; Chang, K.C.

    1985-01-01

    Due to the stringent seismic requirements imposed on nuclear power plants, piping engineers have resorted to the extensive use of snubbers to support nuclear piping systems. The advantage of snubbers is that they provide dynamic restraint while allowing free thermal growth of the pipe. Unfortunately, as more plants go into operation, utilities have to face the costs of strict in-service inspection requirements and risks of unscheduled or extended plant outages associated with snubber failures. The snubber inspection requirements, defined in plant Technical Specifications, require periodic visual inspections of all snubbers and functional tests of a percentage of the plant snubbers, during refueling outages. For a typical 1000 Mw unit this represents from 50 to several hundred snubbers to be functionally tested at each refueling outage. Should failures occur during testing, the sample size must be further increased. Very quickly the costs and risks of extended shutdowns have led the industry to consider, and in many cases implement, snubber reduction programs. At the same time several changes in seismic design criteria have greatly facilitated the reduction of snubbers, making snubber elimination economically and technically attractive. In this paper we examine the costs and benefits of snubber reduction programs and propose a method for evaluating their cost benefits

  13. AP1000 construction and operating costs

    International Nuclear Information System (INIS)

    Winters, J.W.; Corletti, M.M.; Thompson, M.

    2001-01-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  14. AP1000 construction and operating costs

    Energy Technology Data Exchange (ETDEWEB)

    Winters, J.W.; Corletti, M.M. [Westinghouse Electric Corp., Pittsburgh, PA (United States); Thompson, M

    2001-07-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  15. Use of virtual environments to reduce the construction costs of the next generation nuclear power reactors

    International Nuclear Information System (INIS)

    Whisker, V.E.; Baratta, A.J.

    2007-01-01

    The near term deployment of the next generation of reactors will only be successful if they are built on time and without the costly overruns experienced in the previous generation. One critical factor in achieving these goals is to ensure the design is optimized for constructability. In this work the authors explored the effectiveness of full-scale virtual reality simulation in the optimization of the design and construction of the next generation of nuclear reactors. The research tested the suitability of immersive virtual reality display technology in aiding engineers in evaluating potential cost reductions that can be realized by the optimization of design and installation and construction sequences. The intent of this research is to see if this type of technology can be used in capacities similar to those currently filled by full-scale physical mockups and desktop simulations. Using a fully-immersive five sided virtual reality system, known as a CAVE, the authors constructed a series of virtual mockups that represented two next generation nuclear power plants, the Westinghouse AP-1000 and the Pebble Bed Modular Reactor (PBMR). These virtual mockups were then tested as a design tool to help locate and correct problem areas, to optimize the construction sequence, and to assist with familiarizing trades people with the performance of maintenance activities. A series of experiments were performed to assess the usefulness of these virtual mockups in accomplishing these tasks. (authors)

  16. Socio-economic and Engineering Assessments of Renewable Energy Cost Reduction Potential

    Science.gov (United States)

    Seel, Joachim

    This dissertation combines three perspectives on the potential of cost reductions of renewable energy--a relevant topic, as high energy costs have traditionally been cited as major reason to vindicate developments of fossil fuel and nuclear power plants, and to justify financial support mechanisms and special incentives for renewable energy generators. First, I highlight the role of market and policy drivers in an international comparison of upfront capital expenses of residential photovoltaic systems in Germany and the United States that result in price differences of a factor of two and suggest cost reduction opportunities. In a second article I examine engineering approaches and siting considerations of large-scale photovoltaic projects in the United States that enable substantial system performance increases and allow thus for lower energy costs on a levelized basis. Finally, I investigate future cost reduction options of wind energy, ranging from capital expenses, operating expenses, and performance over a project's lifetime to financing costs. The assessment shows both substantial further cost decline potential for mature technologies like land-based turbines, nascent technologies like fixed-bottom offshore turbines, and experimental technologies like floating offshore turbines. The following paragraphs summarize each analysis: International upfront capital cost comparison of residential solar systems: Residential photovoltaic (PV) systems were twice as expensive in the United States as in Germany in 2012. This price discrepancy stems primarily from differences in non-hardware or "soft" costs between the two countries, of which only 35% be explained by differences in cumulative market size and associated learning. A survey of German PV installers was deployed to collect granular data on PV soft costs in Germany, and the results are compared to those of a similar survey of U.S. PV installers. Non-module hardware costs and all analyzed soft costs are lower in

  17. Risk, innovation, electricity infrastructure and construction cost overruns: Testing six hypotheses

    International Nuclear Information System (INIS)

    Sovacool, Benjamin K.; Gilbert, Alex; Nugent, Daniel

    2014-01-01

    This study investigates the frequency and magnitude of cost and time overruns occurring during the construction of 401 electricity projects built between 1936 and 2014 in 57 countries. In aggregate, these projects required approximately $820 billion in investment, and amounted to 325,515 MW of installed capacity and 8495 km of transmission lines. We use this sample of projects to test six hypotheses about construction cost overruns related to (1) diseconomies of scale, (2) project delays, (3) technological learning, (4) regulation and markets, (5) decentralization and modularity, and (6) normalization of results to scale. We find that nuclear reactors are the riskiest technology in terms of mean cost escalation as a percentage of budget and frequency; that hydroelectric dams stand apart for their mean cost escalation in total dollars; that many of the hypotheses grounded in the literature appear wrong; and that financing, partnerships, modularity, and accountability may have more to do with overruns than technology. - Highlights: • Many hypotheses about construction overruns grounded in the literature appear wrong. • Nuclear reactors are the most prone to cost overruns as a percentage of budget and frequency. • Hydroelectric dams stand apart for their mean cost escalation in total dollars. • Solar and wind energy systems are least at risk to cost overruns

  18. Least cost planning for CO2-reduction strategies

    International Nuclear Information System (INIS)

    Seifritz, W.

    1990-01-01

    A first recommendation for the determination of the minimum costs for a carbon-dioxide reduction strategy is presented. For this, the tabulation of so-called, 'CO 2 -ranking-lists', containing the relationship between the costs of a distinct measure to avoid the emission of certain amount of CO 2 (in dollar/t CO 2 ) versus its potential (in t CO 2 /yr), is indispensable. Some basic aspects of this approach are discussed and a first guess of the costs of some measures to avoid CO 2 -emissions into the atmosphere is presented. (orig.) [de

  19. Summary Report of Advanced Hydropower Innovations and Cost Reduction Workshop at Arlington, VA, November 5 & 6, 2015

    Energy Technology Data Exchange (ETDEWEB)

    O' Connor, Patrick [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Rugani, Kelsey [Kearns & West, Inc., San Francisco, CA (United States); West, Anna [Kearns & West, Inc., San Francisco, CA (United States)

    2016-03-01

    On behalf of the U.S. Department of Energy (DOE) Wind and Water Power Technology Office (WWPTO), Oak Ridge National Laboratory (ORNL), hosted a day and half long workshop on November 5 and 6, 2015 in the Washington, D.C. metro area to discuss cost reduction opportunities in the development of hydropower projects. The workshop had a further targeted focus on the costs of small, low-head1 facilities at both non-powered dams (NPDs) and along undeveloped stream reaches (also known as New Stream-Reach Development or “NSD”). Workshop participants included a cross-section of seasoned experts, including project owners and developers, engineering and construction experts, conventional and next-generation equipment manufacturers, and others to identify the most promising ways to reduce costs and achieve improvements for hydropower projects.

  20. Development of pollution reduction strategies for Mexico City: Estimating cost and ozone reduction effectiveness

    International Nuclear Information System (INIS)

    Thayer, G.R.; Hardie, R.W.; Barrera-Roldan, A.

    1993-01-01

    This reports on the collection and preparation of data (costs and air quality improvement) for the strategic evaluation portion of the Mexico City Air Quality Research Initiative (MARI). Reports written for the Mexico City government by various international organizations were used to identify proposed options along with estimates of cost and emission reductions. Information from appropriate options identified by SCAQMD for Southem California were also used in the analysis. A linear optimization method was used to select a group of options or a strategy to be evaluated by decision analysis. However, the reduction of ozone levels is not a linear function of the reduction of hydrocarbon and NO x emissions. Therefore, a more detailed analysis was required for ozone. An equation for a plane on an isopleth calculated with a trajectory model was obtained using two endpoints that bracket the expected total ozone precursor reductions plus the starting concentrations for hydrocarbons and NO x . The relationship between ozone levels and the hydrocarbon and NO x concentrations was assumed to lie on this plane. This relationship was used in the linear optimization program to select the options comprising a strategy

  1. Biological waste by-production costs in forest management and possibilities for their reduction

    Directory of Open Access Journals (Sweden)

    Jiří Kadlec

    2004-01-01

    Full Text Available Biological wastes in forestry were observed from view of their by-production in silvicultural and logging operations. There were identified points where biological waste was produced in this paper, waste costs ratio for silvicultural and logging operations and were made suggestions for reduction of these costs. Biological waste costs give 34.4% of total costs of silvicultural operations and 30% of total costs of logging operations. Natural regeneration and minor forest produce operations are opportunities for reduction of these costs.

  2. Development of an innovative PWR for low cost fuel recycle and waste reduction

    International Nuclear Information System (INIS)

    Kanagawa, Takashi; Onoue, Masaaki

    2001-01-01

    In order to bear long-term and stable energy supply, it is important for nuclear power generation to realize establishment of energy security controlling dependence on natural resources and reduction of long-life radioactive wastes such as minor actinide elements (MA) and so on. For this, establishment of fast breeder reproducible on its fuel and of fuel recycling is essential and construction of the fuel recycling capable of repeatedly recycling of plutonium (Pu) and MA with low cost is required. Here were proposed a fuel recycling system combining recycling type PWR with advanced recycling system under development for Na cooling fast breeder reactor as a candidate filling such conditions, to show its characteristics and effects after its introduction. By this system, some facilities to realize flexible and low cost fuel recycling, to reduce longer-life radioactive wastes due to recycling burning of Pu and MA, and to realize an electric power supplying system independent on natural resources due to fuel breeding feature, were shown. (G.K.)

  3. A cooperative reduction model for regional air pollution control in China that considers adverse health effects and pollutant reduction costs.

    Science.gov (United States)

    Xie, Yujing; Zhao, Laijun; Xue, Jian; Hu, Qingmi; Xu, Xiang; Wang, Hongbo

    2016-12-15

    How to effectively control severe regional air pollution has become a focus of global concern recently. The non-cooperative reduction model (NCRM) is still the main air pollution control pattern in China, but it is both ineffective and costly, because each province must independently fight air pollution. Thus, we proposed a cooperative reduction model (CRM), with the goal of maximizing the reduction in adverse health effects (AHEs) at the lowest cost by encouraging neighboring areas to jointly control air pollution. CRM has two parts: a model of optimal pollutant removal rates using two optimization objectives (maximizing the reduction in AHEs and minimizing pollutant reduction cost) while meeting the regional pollution control targets set by the central government, and a model that allocates the cooperation benefits (i.e., health improvement and cost reduction) among the participants according to their contributions using the Shapley value method. We applied CRM to the case of sulfur dioxide (SO 2 ) reduction in Yangtze River Delta region. Based on data from 2003 to 2013, and using mortality due to respiratory and cardiovascular diseases as the health endpoints, CRM saves 437 more lives than NCRM, amounting to 12.1% of the reduction under NCRM. CRM also reduced costs by US $65.8×10 6 compared with NCRM, which is 5.2% of the total cost of NCRM. Thus, CRM performs significantly better than NCRM. Each province obtains significant benefits from cooperation, which can motivate them to actively cooperate in the long term. A sensitivity analysis was performed to quantify the effects of parameter values on the cooperation benefits. Results shown that the CRM is not sensitive to the changes in each province's pollutant carrying capacity and the minimum pollutant removal capacity, but sensitive to the maximum pollutant reduction capacity. Moreover, higher cooperation benefits will be generated when a province's maximum pollutant reduction capacity increases. Copyright

  4. Construction of VLCC marine oil storage cost index system

    Science.gov (United States)

    Li, Yuan; Li, Yule; Lu, Jinshu; Wu, Wenfeng; Zhu, Faxin; Chen, Tian; Qin, Beichen

    2018-04-01

    VLCC as the research object, the basic knowledge of VLCC is summarized. According to the phenomenon that VLCC is applied to offshore oil storage gradually, this paper applies the theoretical analysis method to analyze the excess capacity from VLCC, the drop of oil price, the aging VLCC is more suitable for offshore storage The paper analyzes the reason of VLCC offshore oil storage from three aspects, analyzes the cost of VLCC offshore storage from the aspects of manpower cost and shipping cost, and constructs the cost index system of VLCC offshore oil storage.

  5. CONSTRUCTION OF A DIFFERENTIAL ISOTHERMAL CALORIMETER OF HIGH SENSITIVITY AND LOW COST.

    OpenAIRE

    Trinca, RB; Perles, CE; Volpe, PLO

    2009-01-01

    CONSTRUCTION OF A DIFFERENTIAL ISOTHERMAL CALORIMETER OF HIGH SENSITIVITY AND LOW COST The high cost of sensitivity commercial calorimeters may represent an obstacle for many calorimetric research groups. This work describes (fie construction and calibration of a batch differential heat conduction calorimeter with sample cells volumes of about 400 mu L. The calorimeter was built using two small high sensibility square Peltier thermoelectric sensors and the total cost was estimated to be about...

  6. Dynamic cost control information system for nuclear power plant construction

    International Nuclear Information System (INIS)

    Wang Yongqing; Liu Wei

    1998-01-01

    The authors first introduce the cost control functions of some overseas popular project management software at present and the specific ways of cost control of nuclear power plant construction in China. Then the authors stress the necessity of cost and schedule control integration and present the concept of dynamic cost control, the design scheme of dynamic cost control information system and the data structure modeling. Based on the above, the authors can develop the system which has the functions of dynamic estimate, cash flow management and cost optimization for nuclear engineering

  7. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  8. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    Directory of Open Access Journals (Sweden)

    Iakymchuk Iryna M.

    2017-09-01

    Full Text Available The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiveness of innovation project by providing cost-management services at all stages of investment project, identifying opportunities for reducing them, thereby contributing to sustainable development of construction organization over time. It has been concluded that the more specific the program of activities of construction organization, the more accurate the process of identification of costs becomes, the more efficient is the management of costs, targeted at saving resources, reducing the self cost of construction works.

  9. Construction costs, payback times, and the leaf economics of carnivorous plants.

    Science.gov (United States)

    Karagatzides, Jim D; Ellison, Aaron M

    2009-09-01

    Understanding how different plant species and functional types "invest" carbon and nutrients is a major goal of plant ecologists. Two measures of such investments are "construction costs" (carbon needed to produce each gram of tissue) and associated "payback times" for photosynthesis to recover construction costs. These measurements integrate among traits used to assess leaf-trait scaling relationships. Carnivorous plants are model systems for examining mechanisms of leaf-trait coordination, but no studies have measured simultaneously construction costs of carnivorous traps and their photosynthetic rates to determine payback times of traps. We measured mass-based construction costs (CC(mass)) and photosynthesis (A(mass)) for traps, leaves, roots, and rhizomes of 15 carnivorous plant species grown under greenhouse conditions. There were highly significant differences among species in CC(mass) for each structure. Mean CC(mass) of carnivorous traps (1.14 ± 0.24 g glucose/g dry mass) was significantly lower than CC(mass) of leaves of 267 noncarnivorous plant species (1.47 ± 0.17), but all carnivorous plants examined had very low A(mass) and thus, long payback times (495-1551 h). Our results provide the first clear estimates of the marginal benefits of botanical carnivory and place carnivorous plants at the "slow and tough" end of the universal spectrum of leaf traits.

  10. New approaches to cost reduction on the UK continental shelf

    Energy Technology Data Exchange (ETDEWEB)

    Curtis, M I

    1994-12-31

    The conference paper deals with cost reduction on the UK continental shelf. New approaches on the reduction of field development costs are compared with the cases if traditional approaches had been followed. Field developments where success in aligning the goals and objectives of the contractors and owners which led to projects being delivered on time but more than 20% below budget, are exemplified. The contractors in the alliance received 55% of the savings in addition to their normal profit. The procedure to follow in such cases, is discussed

  11. New approaches to cost reduction on the UK continental shelf

    International Nuclear Information System (INIS)

    Curtis, M.I.

    1994-01-01

    The conference paper deals with cost reduction on the UK continental shelf. New approaches on the reduction of field development costs are compared with the cases if traditional approaches had been followed. Field developments where success in aligning the goals and objectives of the contractors and owners which led to projects being delivered on time but more than 20% below budget, are exemplified. The contractors in the alliance received 55% of the savings in addition to their normal profit. The procedure to follow in such cases, is discussed

  12. Quantifying the emissions reduction effectiveness and costs of oxygenated gasoline

    International Nuclear Information System (INIS)

    Lyons, C.E.

    1993-01-01

    During the fall, winter, and spring of 1991-1992, a measurement program was conducted in Denver, Colorado to quantify the technical and economic effectiveness of oxygenated gasoline in reducing automobile carbon monoxide (CO) emissions. Emissions from 80,000 vehicles under a variety of operating conditions were measured before, during, and after the seasonal introduction of oxygenated gasoline into the region. Gasoline samples were taken from several hundred vehicles to confirm the actual oxygen content of the fuel in use. Vehicle operating conditions, such as cold starts and warm operations, and ambient conditions were characterized. The variations in emissions attributable to fuel type and to operating conditions were then quantified. This paper describes the measurement program and its results. The 1991-1992 Colorado oxygenated gasoline program contributed to a reduction in carbon monoxide (CO) emissions from gasoline-powered vehicles. The measurement program demonstrated that most of the reduction is concentrated in a small percentage of the vehicles that use oxygenated gasoline. The remainder experience little or not reduction in emissions. The oxygenated gasoline program outlays are approximately $25 to $30 million per year in Colorado. These are directly measurable costs, incurred through increased government expenditures, higher costs to private industry, and losses in fuel economy. The measurement program determined the total costs of oxygenated gasoline as an air pollution control strategy for the region. Costs measured included government administration and enforcement, industry production and distribution, and consumer and other user costs. This paper describes the ability of the oxygenated gasoline program to reduce pollution; the overall cost of the program to government, industry, and consumers; and the effectiveness of the program in reducing pollution compared to its costs

  13. A Refined Basket of Goods Approach for Comparing Construction Costs between Countries

    Directory of Open Access Journals (Sweden)

    Rick Best

    2012-11-01

    Full Text Available Most comparisons of construction industry performance requirethat construction costs be converted to a common base. Existingmechanisms for such conversions produce unreliable results.A proposed method for producing industry-specifi c conversionfactors was tested using a single building type. A basket ofmaterials and labour was identifi ed and weighted to refl ect the costshare of each item in a completed project. Prices for the basketwere gathered in three cities and simple construction specifi cconversion indices were calculated based on the constructionpurchasing power of each currency. The construction purchasingpower parities (CPPPs showed marked differences from otheravailable conversion mechanisms such as exchange rates andgeneral purchasing power parities (PPPs that have been used inprevious international comparison studies. While the study waslimited in scope, and is only the fi rst stage of a longer process, thesubstantial differences in comparative costs based on purchasingpower illustrate the problems inherent in international costcomparisons. For example, comparing Singapore and Sydney,Singapore costs appear to be only 40% of those in Sydney (basedon exchange rates about two-thirds the cost of Sydney (usinggeneral PPPs or almost the same (using the preliminary CPPPs.These results illustrate the problems of converting costs fromlocal currencies to a single base currency and suggest that furtherdevelopment is needed to improve the reliability of outcomes.

  14. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  15. Cost analysis of soil-depressurization techniques for indoor radon reduction

    International Nuclear Information System (INIS)

    Henschel, D.B.

    1991-01-01

    The article discusses a parametric cost analysis to evaluate active soil depressurization (ASD) systems for indoor radon reduction in houses. The analysis determined the relative importance of 14 ASD design variables and 2 operating variables on the installation and operating costs of residential ASD systems in several types of houses. Knowledge of the most important variables would enable EPA's research and development efforts to be more effectively directed at ways to reduce ASD costs and thus to increase utilization of the technology. Parameters offering the greatest potential for reductions in installation costs included three dealing with houses with poor subslab communication: (1) reducing the number of subslab depressurization pipes; (2) eliminating excavation of large subslab pits beneath the suction pipes to improve suction field extension; and (3) improving the effectiveness of premitigation subslab communication diagnostic testing in achieving simpler, less expensive ASD system designs. In addition, determining acceptable conditions for discharging ASD exhaust at grade level would reduce installation costs. Better design guidance for crawl-space submembrane depressurization (SMD) systems could reduce installation costs, if difficult membrane sealing steps and complete coverage of the crawl-space floor by the membrane can be avoided

  16. Plant evaluation activities and O and M cost reduction in U.S

    International Nuclear Information System (INIS)

    Itoh, Takeshi

    1998-01-01

    Although some nuclear power plants face the possibility of premature retirement, most nuclear power plants have achieved substantial reductions in costs, mainly in O and M costs, and appear to be competitive with new gas and coal fired power plants. Improving competitiveness of existing nuclear power plants in the United States has primarily been driven by the electric utility self assessment activities. However, the background of this activity has been provided by the activities of NRC, INPO, NEI, EUCG and other activities being conducted for improvement of the nuclear power industry as a whole. Utility companies that are in the forefront of this activity have already achieved the reductions in staffing and outage time that are generally known to be effective for reducing O and M costs and are moving forward with rationalization and cost reductions in other areas. However, these electric utility companies are also achieving high safety and reliability. The staff of these electric utility companies have a high degree of autonomy, self motivation and self critical attitude and the staffing of these companies is a numerically small elite. This culture is supported by the self evaluation activity established by each company and is nurtured and supported by the management system. This appears to be one of the major elements in cost reduction. As this is based on U.S. information, differences in the system, society and culture in other nations mean that these findings may not be directly applicable. However, from the point of view of the prospects of nuclear power, these findings have an important meaning. This meaning is that the achievements in the United States of cost reduction activities centering on O and M costs are an important experience for other countries including Japan in reestablishing the economic competitiveness of nuclear power. (author)

  17. Constructing a holistic approach to disaster risk reduction: the significance of focusing on vulnerability reduction.

    Science.gov (United States)

    Palliyaguru, Roshani; Amaratunga, Dilanthi; Baldry, David

    2014-01-01

    As a result of the increase in natural disaster losses, policy-makers, practitioners, and members of the research community around the world are seeking effective and efficient means of overcoming or minimising them. Although various theoretical constructs are beneficial to understanding the disaster phenomenon and the means of minimising losses, the disaster risk management process becomes less effective if theory and practice are set apart from one another. Consequently, this paper seeks to establish a relationship between two theoretical constructs, 'disaster risk reduction (DRR)' and 'vulnerability reduction', and to develop a holistic approach to DRR with particular reference to improving its applicability in practical settings. It is based on a literature review and on an overall understanding gained through two case studies of post-disaster infrastructure reconstruction projects in Sri Lanka and three expert interviews in Sri Lanka and the United Kingdom. © 2014 The Author(s). Disasters © Overseas Development Institute, 2014.

  18. CANDU 9 - reducing capital costs through advanced construction

    International Nuclear Information System (INIS)

    Hedges, K.; Yu, S.; Hopwood, J.

    1996-01-01

    Reducing costs is a clear priority in nuclear markets where capital reaches billions and financing is hard-won. To address that priority, AECL introduced the use of advanced construction techniques. This has been one of the key thrusts behind its development of CANDU 9. (author)

  19. Construction costs of nuclear power stations

    Energy Technology Data Exchange (ETDEWEB)

    Mandel, H

    1976-03-01

    It is assumed that the demand for electrical energy will continue to rise and that nuclear power will increasingly supply the base-load of electricity generation in the industrialized world. The author identifies areas where techniques and practices to control costs can be improved. Nuclear power offers an alternative to liquid and gaseous fossil fuels and contributes to a relative stability in the price of electric energy. Nuclear power plants can now generate power more cheaply than other thermal power plants down into the upper middle load sector, as indicated in calculations based on a construction time of six years for nuclear plants and four years for others. Special legal provisions, different conditions of financing and taxation, varying methods of power generation cost accounting, and the nonuniform layout of the plant in the various countries make it difficult to compare power generation costs. The author uses mostly experiences gained in the Federal Republic of Germany for some calculations for comparison; he cites lack of standardization and over-long licensing times as major factors in the recent rapid escalation of nuclear power costs and suggests that adoption of standard reactor designs, encouragement of a vigorous and competitive European nuclear industry, and streamlining of licensing procedures to improve the situation. (MCW)

  20. Quantifying the waste reduction potential of using prefabrication in building construction in Hong Kong.

    Science.gov (United States)

    Jaillon, L; Poon, C S; Chiang, Y H

    2009-01-01

    As Hong Kong is a compact city with limited available land and high land prices, the construction of high-rise buildings is prevalent. The construction industry produces a significant amount of building waste. In 2005, about 21.5 million tonnes of construction waste were generated, of which 11% was disposed of in landfills and 89% in public filling areas. At the present rate, Hong Kong will run out of both public filling areas and landfill space within the next decade. The government is taking action to tackle the problem, such as by introducing a construction waste landfill charge, and promoting prefabrication to reduce on-site waste generation. This paper reports an ongoing study on the use of prefabrication in buildings and its impact on waste reduction in Hong Kong. A questionnaire survey was administered to experienced professionals, and case studies of recently completed building projects were conducted. The results revealed that construction waste reduction is one of the major benefits when using prefabrication compared with conventional construction. The average wastage reduction level was about 52%. This implies that a wider use of prefabrication could considerably reduce construction waste generation in Hong Kong and alleviate the burdens associated with its management.

  1. Maintenance management balancing performance maintenance and cost balance at reinforced concrete constructions of the fossil-fuel and nuclear power stations

    International Nuclear Information System (INIS)

    Ito, Hiroshi; Benno, Hiroshi; Ozaki, Mitsuhiro

    2003-01-01

    Life elongation of concrete constructions (CCs) is a very important needs for supporting future safe supply of electric power. However, some CCs constructed and used for a long term at fossil-fuel and nuclear power stations had reduction of their required performance by deterioration based on environmental and using conditions represented by salt-damage. As such constructions are anxious to increase in future, it is necessary to keep reliability of their establishments by providing desired rehabilitation to persist supplying effect of their facilities. On the other hand, as it is also essential to progress keeping and reducing cost of power generation together with development of recent liberalization of electric power, it is an important subject how to keep their performance maintenance and cost balance. Therefore, here were outlined on required performance setting method, inspection method, long-term deterioration forecasting and evaluating methods, selection method of countermeasure scenarios minimizing LCC, inspection period setting method, introduction of database and deterioration forecasting system, and so on, to economically maintain and manage already built reinforced concrete constructions at suitable materials and places to elongate their lives. (G.K.)

  2. UMTRA Project-Level Cost Reduction/Productivity Improvement Program manual

    International Nuclear Information System (INIS)

    1995-06-01

    Mission of the Uranium Mill Tailings Remedial Action (UMTRA) Project Cost Reduction/Productivity Improvement Program (CR/PIP) is to contribute to the UMTRA Project's environmental restoration mission by providing the means to achieve and recognize continuous improvements and cost savings. This manual includes program definition, description of UMTRA project organizational responsibilities and interfaces with existing project functions, guidance to contractors, and definition of project-level functions

  3. Solar cost reduction through technical improvements: the concepts of learning and experience

    Energy Technology Data Exchange (ETDEWEB)

    Krawiec, F.; Flaim, T.

    1979-10-01

    The concepts of learning and experience are reviewed and their usefulness for predicting the future costs of solar technologies are evaluated. The literature review indicated that the cost estimates for solar energy technologies are typically made assuming a fixed production process, characterized by standard capacity factors, overhead, and labor costs. The learning curve is suggested as a generalization of the costs of potential solar energy systems. The concept of experience is too ambiguous to be useful for cost estimation. There is no logical reason to believe that costs will decline purely as a function of cumulative production, and experience curves do not allow the analyst to identify logical sources of cost reduction directly. The procedures for using learning and aggregated cost curves to estimate the costs of solar technologies are outlined. It is recommended that production histories of analogous products and processes are analyzed and the learning and cost curves for these surrogates are estimated. These curves, if judged applicable, can be used to predict the cost reductions in manufacturing solar energy technologies.

  4. External risk factors affecting construction costs

    Science.gov (United States)

    Mubarak, Husin, Saiful; Oktaviati, Mutia

    2017-11-01

    Some risk factors can have impacts on the cost, time, and performance. Results of previous studies indicated that the external conditions are among the factors which give effect to the contractor in the completion of the project. The analysis in the study carried out by considering the conditions of the project in the last 15 years in Aceh province, divided into military conflict phase (2000-2004), post tsunami disaster rehabilitation and reconstruction phase (2005-2009), and post-rehabilitation and reconstruction phase (2010-present). This study intended to analyze the impact of external risk factors, primarily related to the impact on project costs and to investigate the influence of the risk factors and construction phases impacted the project cost. Data was collected by using a questionnaire distributed in 15 large companies qualification contractors in Aceh province. Factors analyzed consisted of socio-political, government policies, natural disasters, and monetary conditions. Data were analyzed using statistical application of severity index to measure the level of risk impact. The analysis results presented the tendency of impact on cost can generally be classified as low. There is only one variable classified as high-impact, variable `fuel price increases', which appear on the military conflict and post tsunami disaster rehabilitation and reconstruction periods. The risk impact on costs from the factors and variables classified with high intensity needs a serious attention, especially when the high level impact is followed by the high frequency of occurrences.

  5. Forecasting Construction Cost Index based on visibility graph: A network approach

    Science.gov (United States)

    Zhang, Rong; Ashuri, Baabak; Shyr, Yu; Deng, Yong

    2018-03-01

    Engineering News-Record (ENR), a professional magazine in the field of global construction engineering, publishes Construction Cost Index (CCI) every month. Cost estimators and contractors assess projects, arrange budgets and prepare bids by forecasting CCI. However, fluctuations and uncertainties of CCI cause irrational estimations now and then. This paper aims at achieving more accurate predictions of CCI based on a network approach in which time series is firstly converted into a visibility graph and future values are forecasted relied on link prediction. According to the experimental results, the proposed method shows satisfactory performance since the error measures are acceptable. Compared with other methods, the proposed method is easier to implement and is able to forecast CCI with less errors. It is convinced that the proposed method is efficient to provide considerably accurate CCI predictions, which will make contributions to the construction engineering by assisting individuals and organizations in reducing costs and making project schedules.

  6. Evaluation of ways and procedures to reduce construction cost and increase competition.

    Science.gov (United States)

    2009-01-01

    Construction cost inflation is affecting many state highway agencies including the Texas Department of : Transportation While some of this increase can be attributed to factors such as soaring cost of energy, : reports of large variations in cost of ...

  7. Extreme Cost Reductions with Multi-Megawatt Centralized Inverter Systems

    Energy Technology Data Exchange (ETDEWEB)

    Schwabe, Ulrich [Alencon LLC; Fishman, Oleg [Alencon LLC

    2015-03-20

    The objective of this project was to fully develop, demonstrate, and commercialize a new type of utility scale PV system. Based on patented technology, this includes the development of a truly centralized inverter system with capacities up to 100MW, and a high voltage, distributed harvesting approach. This system promises to greatly impact both the energy yield from large scale PV systems by reducing losses and increasing yield from mismatched arrays, as well as reduce overall system costs through very cost effective conversion and BOS cost reductions enabled by higher voltage operation.

  8. Architects' perspectives on construction waste reduction by design.

    Science.gov (United States)

    Osmani, M; Glass, J; Price, A D F

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process.

  9. Architects' perspectives on construction waste reduction by design

    International Nuclear Information System (INIS)

    Osmani, M.; Glass, J.; Price, A.D.F.

    2008-01-01

    The construction, demolition and excavation waste arising in England was estimated at 91 million tonnes in 2003. The current thinking on construction waste minimisation is heavily focussed on several issues relating to physical construction waste and recycling guides. Indeed, much had been published on ways to improve on-site waste management and recycling activities but very few attempts made to address the effect of design practices on waste generation. However, there is a consensus in the literature that the architect has a decisive role to play in helping to reduce waste by focussing on designing out waste. This paper examines previous studies on architects' approach towards construction waste minimisation; and by means of a postal questionnaire, investigates: the origins of waste; waste minimisation design practices in the UK; and responsibilities and barriers within the UK architectural profession. The findings reveal that waste management is not a priority in the design process. Additionally, the architects seemed to take the view that waste is mainly produced during site operations and rarely generated during the design stages; however, about one-third of construction waste could essentially arise from design decisions. Results also indicate that a number of constraints, namely: lack of interest from clients; attitudes towards waste minimisation; and training all act as disincentives to a proactive and sustainable implementation of waste reduction strategies during the design process

  10. Endovascular aneurysm repair delivery redesign leads to quality improvement and cost reduction.

    Science.gov (United States)

    Warner, Courtney J; Horvath, Alexander J; Powell, Richard J; Columbo, Jesse A; Walsh, Teri R; Goodney, Philip P; Walsh, Daniel B; Stone, David H

    2015-08-01

    Endovascular aneurysm repair (EVAR) is now a mainstay of therapy for abdominal aortic aneurysm, although it remains associated with significant expense. We performed a comprehensive analysis of EVAR delivery at an academic medical center to identify targets for quality improvement and cost reduction in light of impending health care reform. All infrarenal EVARs performed from April 2011 to March 2012 were identified (N = 127). Procedures were included if they met standard commercial instructions for use guidelines, used a single manufacturer, and were billed to Medicare diagnosis-related group 238 (n = 49). By use of DMAIC (define, measure, analyze, improve, and control) quality improvement methodology (define, measure, analyze, improve, control), targets for EVAR quality improvement were identified and high-yield changes were implemented. Procedure technical costs were calculated before and after process redesign. Perioperative services and clinic visits were identified as targets for quality improvement efforts and cost reduction. Mean technical costs before the intervention were $31,672, with endograft implants accounting for 52%. Pricing redesign in collaboration with hospital purchasing reduced mean EVAR technical costs to $28,607, a 10% reduction in overall cost, with endograft implants now accounting for 46%. Perioperative implementation of instrument tray redesign reduced instrument use by 32% (184 vs 132 instruments), saving $50,000 annually. Unnecessary clinic visits were reduced by 39% (1.6 vs 1.1 clinic visits per patient) through implementation of a preclinic imaging protocol. There was no difference in mean length of stay after the intervention. Comprehensive EVAR delivery redesign leads to cost reduction and waste elimination while preserving quality. Future efforts to achieve more competitive and transparent device pricing will make EVAR more cost neutral and enhance its financial sustainability for health care systems. Copyright © 2015 Society for

  11. A Model of Cost Reduction and Standardization: Improved Cost Savings While Maintaining the Quality of Care.

    Science.gov (United States)

    Guzman, Michael J; Gitelis, Matthew E; Linn, John G; Ujiki, Michael B; Waskerwitz, Matthew; Umanskiy, Konstantin; Muldoon, Joseph P

    2015-11-01

    Surgeon instrument choices are influenced by training, previous experience, and established preferences. This causes variability in the cost of common operations, such as laparoscopic appendectomy. Many surgeons are unaware of the impact that this has on healthcare spending. We sought to educate surgeons on their instrument use and develop standardized strategies for operating room cost reduction. We collected the individual surgeon instrument cost for performing a laparoscopic appendectomy. Sixteen surgeons were educated about these costs and provided with cost-effective instruments and techniques. This study was conducted in a university-affiliated hospital system. Patients included those undergoing a laparoscopic appendectomy within the hospital system. Patient demographics, operating room costs, and short-term outcomes for the fiscal year before and after the education program were then compared. During fiscal year 2013, a total of 336 laparoscopic appendectomies were performed compared with 357 in 2014. Twelve surgeons had a ≥5% reduction in average cost per case. Overall, the average cost per case was reduced by 17% (p day readmissions, postoperative infections, operating time, or reoperations. This retrospective study is subject to the accuracy of the medical chart system. In addition, specific instrument costs are based on our institution contracts and vary compared with other institutions. In this study we demonstrate that operative instrument costs for laparoscopic appendectomy can be significantly reduced by informing the surgeons of their operating room costs compared with their peers and providing a low-cost standardized instrument tray. Importantly, this can be realized without any incentive or punitive measures and does not negatively impact outcomes. Additional work is needed to expand these results to more operations, hospital systems, and training programs.

  12. Solid construction waste management in large civil construction companies through use of specific software - case study

    Directory of Open Access Journals (Sweden)

    Caio Dalla Zanna

    2017-05-01

    Full Text Available In the current construction market there is a high demand for sustainability. In addition to that the Brazilian government is enacting tougher and tougher legislation on the disposal of solid construction waste. These demands increasingly make the construction company responsible for the entire lifecycle of its waste as well as the accompanying cost and environmental impact of solid waste. A software program was used in the research which allows construction companies gather information about waste. This helps the decision makers, at all different levels of the company improving waste management through better decisions. The software program was used during the construction of two residential buildings, constructed by a large construction company in the South of Brazil. Five key performance indicators were used by the construction company team: Generated Waste Height (cm, cost per built area (R$ m-², Waste Segregation Quality Index (WSQI, Effective Waste Management Index (EWMI and Waste Management Quality Index (WMQI. After four months the total cost of waste management was R$ 83,551.71 for site A and R$ 91,668.02 for site B. About 70% of the waste was raw material waste. The software program provided information not previously available, which made it possible to calculate the cost of material loss, indicating corrective actions, all without losing sight of cost reduction opportunities for the management of Solid construction Waste (SCW.

  13. Cost effective reductions in the agricultural load of nitrogen to the Baltic Sea

    Energy Technology Data Exchange (ETDEWEB)

    Elofsson, K.

    1997-11-01

    To restore the health of the Baltic Sea, the Helsinki Commission, HELCOM, suggests that the nitrogen load should be reduced by 50%. The agricultural sector accounts for about 1/3 of the total load of nitrogen to the Baltic Sea, while point sources account for about 1/4. The remaining load reaches the Baltic as atmospheric deposition. The purpose of this study is to calculate cost effective reductions in the agricultural load of nitrogen to the Baltic Sea coastal waters. The Baltic Sea drainage basin is divided into 17 regions, which differ with respect to costs, leaching and nitrogen retention. For each region, cost functions are estimated for 11 nitrogen abatement measures in the agricultural sector. It is difficult to find reliable data on both costs and biological parameters for all regions included, and several assumptions are made to obtain the cost functions. In this paper the total cost of a 50% reduction of the nitrogen load from arable land is estimated to 11,700 million SEK per year. A decrease in the use of fertilizer nitrogen is the most important measure in a cost effective policy. Other measures included in the cost effective solution are changes in land-use and in manure management practices. If, instead, each country is required to reduce its load by 50%, the total cost will increase by nearly 60%. Three out of nine countries around the Baltic Sea would gain from separate reduction targets, while all others lose by such a policy. The results are sensitive to assumptions about the biological parameters and the shape of the cost functions for reductions in chemical fertilizer. 75 refs, 3 figs, 11 tabs

  14. LHC Civil Engineering Construction Contracts Cost Monitoring and Budget Forecasting

    CERN Document Server

    Skelton, K

    2000-01-01

    The Civil Engineering project for the LHC is estimated at 350 MCHF, of which about 316 MCHF is for the construction contracts. These contracts are based on a system of remeasurement whereby the consultant estimates the quantities required for the construction of each structure and the contractor commits himself to the unit price, which define the initial tender price. There are many factors that affect the final price for these contracts, from increases or decreases in quantities of the estimated amounts in the original bill of quantities to variations to the contract. This paper will look at how these factors change costs at the individual level of a structure to the overall costs of the contract. It will look at how the Civil Engineering Group monitors these changes to calculate cash flows and final costs and how this information is used as a basis for budget forecasts.

  15. Probabilistic prediction of expected ground condition and construction time and costs in road tunnels

    Directory of Open Access Journals (Sweden)

    A. Mahmoodzadeh

    2016-10-01

    Full Text Available Ground condition and construction (excavation and support time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding.

  16. Low cost construction technologies and materials - case study Mozambuique

    CSIR Research Space (South Africa)

    Kuchena, JC

    2009-09-01

    Full Text Available Low cost or affordable construction technologies and materials are often touted as a panacea in meeting the ever growing demand for rapid housing delivery in developing economies. Mozambique as with most of the developing world, from both historical...

  17. Cost reductions of fuel cells for transport applications: fuel processing options

    Energy Technology Data Exchange (ETDEWEB)

    Teagan, W P; Bentley, J; Barnett, B [Arthur D. Little, Inc., Cambridge, MA (United States)

    1998-03-15

    The highly favorable efficiency/environmental characteristics of fuel cell technologies have now been verified by virtue of recent and ongoing field experience. The key issue regarding the timing and extent of fuel cell commercialization is the ability to reduce costs to acceptable levels in both stationary and transport applications. It is increasingly recognized that the fuel processing subsystem can have a major impact on overall system costs, particularly as ongoing R and D efforts result in reduction of the basic cost structure of stacks which currently dominate system costs. The fuel processing subsystem for polymer electrolyte membrane fuel cell (PEMFC) technology, which is the focus of transport applications, includes the reformer, shift reactors, and means for CO reduction. In addition to low cost, transport applications require a fuel processor that is compact and can start rapidly. This paper describes the impact of factors such as fuel choice operating temperature, material selection, catalyst requirements, and controls on the cost of fuel processing systems. There are fuel processor technology paths which manufacturing cost analyses indicate are consistent with fuel processor subsystem costs of under $150/kW in stationary applications and $30/kW in transport applications. As such, the costs of mature fuel processing subsystem technologies should be consistent with their use in commercially viable fuel cell systems in both application categories. (orig.)

  18. Introduction to cost-effectiveness analysis of risk reduction measures in energy systems

    International Nuclear Information System (INIS)

    1986-07-01

    The aim of this report is to introduce readers to methods of cost-effectiveness analysis and their application in risk reduction, especially in connection with the energy-producing industries. The background to the assessment of risk and the problems in estimating it quantitatively are outlined. The methodology of cost-effectiveness analysis is then described, particular attention being given to the way in which results are derived and the overall use that can be made of them. This is followed by a discussion of quantitative applications and an outline of the methods that may be used to derive estimates both of risk and the cost of reducing it. The use of cost-effectiveness analysis is illustrated in an appendix, which gives as a worked example a case study on the reduction of public risk associated with radioactive releases during normal operation of a PWR. After drawing some general conclusions the report recommends that such analyses should normally be used as an aid to risk management whenever several alternative risk reduction measures are under consideration

  19. Cost-Optimal Pathways to 75% Fuel Reduction in Remote Alaskan Villages: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Simpkins, Travis; Cutler, Dylan; Hirsch, Brian; Olis, Dan; Anderson, Kate

    2015-10-28

    There are thousands of isolated, diesel-powered microgrids that deliver energy to remote communities around the world at very high energy costs. The Remote Communities Renewable Energy program aims to help these communities reduce their fuel consumption and lower their energy costs through the use of high penetration renewable energy. As part of this program, the REopt modeling platform for energy system integration and optimization was used to analyze cost-optimal pathways toward achieving a combined 75% reduction in diesel fuel and fuel oil consumption in a select Alaskan village. In addition to the existing diesel generator and fuel oil heating technologies, the model was able to select from among wind, battery storage, and dispatchable electric heaters to meet the electrical and thermal loads. The model results indicate that while 75% fuel reduction appears to be technically feasible it may not be economically viable at this time. When the fuel reduction target was relaxed, the results indicate that by installing high-penetration renewable energy, the community could lower their energy costs by 21% while still reducing their fuel consumption by 54%.

  20. Quantitative Decision Making Model for Carbon Reduction in Road Construction Projects Using Green Technologies

    Directory of Open Access Journals (Sweden)

    Woosik Jang

    2015-08-01

    Full Text Available Numerous countries have established policies for reducing greenhouse gas emissions and have suggested goals pertaining to these reductions. To reach the target reduction amounts, studies on the reduction of carbon emissions have been conducted with regard to all stages and processes in construction projects. According to a study on carbon emissions, the carbon emissions generated during the construction stage of road projects account for approximately 76 to 86% of the total carbon emissions, far exceeding the other stages, such as maintenance or demolition. Therefore, this study aims to develop a quantitative decision making model that supports the application of green technologies (GTs to reduce carbon emissions during the construction stage of road construction projects. First, the authors selected environmental soundness, economic feasibility and constructability as the key assessment indices for evaluating 20 GTs. Second, a fuzzy set/qualitative comparative analysis (FS/QCA was used to establish an objective decision-making model for the assessment of both the quantitative and qualitative characteristics of the key indices. To support the developed model, an expert survey was performed to assess the applicability of each GT from a practical perspective, which was verified with a case study using two additional GTs. The proposed model is expected to support practitioners in the application of suitable GTs to road projects and reduce carbon emissions, resulting in better decision making during road construction projects.

  1. Future perspective of cost for nuclear power generation

    International Nuclear Information System (INIS)

    Maeda, Ichiro

    1988-01-01

    The report presents and discussed results of evaluation of the cost for power generation in this and forthcoming years on the basis of an analysis of the current fuel prices and the economics of various power sources. Calculations show that nuclear power generation at present is inferior to coal-firing power generation in terms of required costs, but can become superior in the future due to an increased burn-up and reduced construction cost. Investigations are made of possible contributions of future technical improvements to reduction in the overall cost. Results suggest that nuclear power generation will be the most efficient among the various electric sources because of its technology-intensive feature. Development of improved light water reactors is of special importance to achieve a high burn-up and reduced construction costs. In general, the fixed cost accounts for a large part of the overall nuclear power generation cost, indicating that a reduction in construction cost can greatly increase the economic efficiency. Changes in the yen's exchange rate seem to have little effect on the economics of nuclear power generation, which represents another favorable aspect of this type of energy. (Nogami, K.)

  2. Benefit Evaluation of Implementing BIM in Construction Projects

    Science.gov (United States)

    Chou, Hui-Yu; Chen, Pei-Yu

    2017-10-01

    Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.

  3. Flying Lessons: Learning from Ryanair's Cost Reduction Culture

    Science.gov (United States)

    Lawton, Thomas C.

    2000-01-01

    Through radically improving the value equation for airline customers, Ryanair has served to shake-up established norms and practices in European aviation. Underpinning its price leadership and market success is a vigorous and relentless cost reduction ethos and resultant low break-even load factor. Ryanair has lowered European airline cost structures considerably, shattering existing cost floors. Few competitors are able to follow, either because they do not know how or they are unable due to social settlement obligations or service commitments. At the same time, the company has maintained high average load factors on its flights. Taken in conjunction with its low break-even load factor, this results in consistently high overall profit margins. On this basis, Ryanair is likely to remain a significant competitor and increase its market presence and success across Europe.

  4. Technology learning for fuel cells. An assessment of past and potential cost reductions

    International Nuclear Information System (INIS)

    Schoots, K.; Van der Zwaan, B.C.C.; Kramer, G.J.

    2010-01-01

    Fuel cells have gained considerable interest as a means to efficiently convert the energy stored in gases like hydrogen and methane into electricity. Further developing fuel cells in order to reach cost, safety and reliability levels at which their widespread use becomes feasible is an essential prerequisite for the potential establishment of a 'hydrogen economy'. A major factor currently obviating the extensive use of fuel cells is their relatively high costs. At present we estimate these at about 1100 EUR(2005)W for an 80 kW fuel cell system but notice that specific costs vary markedly with fuel cell system power capacity. We analyze past fuel cell cost reductions for both individual manufacturers and the global market. We determine learning curves, with fairly high uncertainty ranges, for three different types of fuel cell technology - AFC, PAFC and PEMFC - each manufactured by a different producer. For PEMFC technology we also calculate a global learning curve, characterised by a learning rate of 21% with an error margin of 4%. Given their respective uncertainties, this global learning rate value is in agreement with those we find for different manufacturers. In contrast to some other new energy technologies, R and D still plays a major role in today's fuel cell improvement process and hence probably explains a substantial part of our observed cost reductions. The remaining share of these cost reductions derives from learning-by-doing proper. Since learning-by-doing usually involves a learning rate of typically 20%, the residual value for pure learning we find for fuel cells is relatively low. In an ideal scenario for fuel cell technology we estimate a bottom-line for specific (80 kW system) manufacturing costs of 95 EUR(2005)W. Although learning curves observed in the past constitute no guarantee for sustained cost reductions in the future, when we assume global total learning at the pace calculated here as the only cost reduction mechanism, this ultimate cost

  5. Time-driven activity-based costing to identify opportunities for cost reduction in pediatric appendectomy.

    Science.gov (United States)

    Yu, Yangyang R; Abbas, Paulette I; Smith, Carolyn M; Carberry, Kathleen E; Ren, Hui; Patel, Binita; Nuchtern, Jed G; Lopez, Monica E

    2016-12-01

    As reimbursement programs shift to value-based payment models emphasizing quality and efficient healthcare delivery, there exists a need to better understand process management to unearth true costs of patient care. We sought to identify cost-reduction opportunities in simple appendicitis management by applying a time-driven activity-based costing (TDABC) methodology to this high-volume surgical condition. Process maps were created using medical record time stamps. Labor capacity cost rates were calculated using national median physician salaries, weighted nurse-patient ratios, and hospital cost data. Consumable costs for supplies, pharmacy, laboratory, and food were derived from the hospital general ledger. Time-driven activity-based costing resulted in precise per-minute calculation of personnel costs. Highest costs were in the operating room ($747.07), hospital floor ($388.20), and emergency department ($296.21). Major contributors to length of stay were emergency department evaluation (270min), operating room availability (395min), and post-operative monitoring (1128min). The TDABC model led to $1712.16 in personnel costs and $1041.23 in consumable costs for a total appendicitis cost of $2753.39. Inefficiencies in healthcare delivery can be identified through TDABC. Triage-based standing delegation orders, advanced practice providers, and same day discharge protocols are proposed cost-reducing interventions to optimize value-based care for simple appendicitis. II. Copyright © 2016 Elsevier Inc. All rights reserved.

  6. Class Size Reduction or Rapid Formative Assessment?: A Comparison of Cost-Effectiveness

    Science.gov (United States)

    Yeh, Stuart S.

    2009-01-01

    The cost-effectiveness of class size reduction (CSR) was compared with the cost-effectiveness of rapid formative assessment, a promising alternative for raising student achievement. Drawing upon existing meta-analyses of the effects of student-teacher ratio, evaluations of CSR in Tennessee, California, and Wisconsin, and RAND cost estimates, CSR…

  7. The integration of price/cost modelling and construction planning - the automated generation of construc­tion operation

    Directory of Open Access Journals (Sweden)

    P. A. Bowen

    1997-07-01

    Full Text Available The fact that traditional price/cost models are unrelated to the construction process renders them largely unsuited to the provision of meaningful price/cost advice. The nature and lengthiness of the construction planning process has precluded its incorporation into price/cost modelling during the pre-tender phase of the traditional building procurement process. The nub of the modelling problem has been how to integrate the complex process of construction planning into the pre-tender price/cost modelling process. In this paper the authors propose the synthesis of artificial intelligence techniques and construction planning techniques, resulting in a conceptual framework for a network-based cost modelling system for use by quantity surveyors in the cost modelling of buildings.

  8. Understanding the reductions in US corn ethanol production costs: An experience curve approach

    International Nuclear Information System (INIS)

    Hettinga, W.G.; Junginger, H.M.; Dekker, S.C.; Hoogwijk, M.; McAloon, A.J.; Hicks, K.B.

    2009-01-01

    The US is currently the world's largest ethanol producer. An increasing percentage is used as transportation fuel, but debates continue on its costs competitiveness and energy balance. In this study, technological development of ethanol production and resulting cost reductions are investigated by using the experience curve approach, scrutinizing costs of dry grind ethanol production over the timeframe 1980-2005. Cost reductions are differentiated between feedstock (corn) production and industrial (ethanol) processing. Corn production costs in the US have declined by 62% over 30 years, down to 100$ 2005 /tonne in 2005, while corn production volumes almost doubled since 1975. A progress ratio (PR) of 0.55 is calculated indicating a 45% cost decline over each doubling in cumulative production. Higher corn yields and increasing farm sizes are the most important drivers behind this cost decline. Industrial processing costs of ethanol have declined by 45% since 1983, to below 130$ 2005 /m 3 in 2005 (excluding costs for corn and capital), equivalent to a PR of 0.87. Total ethanol production costs (including capital and net corn costs) have declined approximately 60% from 800$ 2005 /m 3 in the early 1980s, to 300$ 2005 /m 3 in 2005. Higher ethanol yields, lower energy use and the replacement of beverage alcohol-based production technologies have mostly contributed to this substantial cost decline. In addition, the average size of dry grind ethanol plants increased by 235% since 1990. For the future it is estimated that solely due to technological learning, production costs of ethanol may decline 28-44%, though this excludes effects of the current rising corn and fossil fuel costs. It is also concluded that experience curves are a valuable tool to describe both past and potential future cost reductions in US corn-based ethanol production

  9. Construction of road network vulnerability evaluation index based on general travel cost

    Science.gov (United States)

    Leng, Jun-qiang; Zhai, Jing; Li, Qian-wen; Zhao, Lin

    2018-03-01

    With the development of China's economy and the continuous improvement of her urban road network, the vulnerability of the urban road network has attracted increasing attention. Based on general travel cost, this work constructs the vulnerability evaluation index for the urban road network, and evaluates the vulnerability of the urban road network from the perspective of user generalised travel cost. Firstly, the generalised travel cost model is constructed based on vehicle cost, travel time, and traveller comfort. Then, the network efficiency index is selected as an evaluation index of vulnerability: the network efficiency index is composed of the traffic volume and the generalised travel cost, which are obtained from the equilibrium state of the network. In addition, the research analyses the influence of traffic capacity decrease, road section attribute value, and location of road section, on vulnerability. Finally, the vulnerability index is used to analyse the local area network of Harbin and verify its applicability.

  10. Redesign of an in-market food processor for manufacturing cost reduction using DFMA methodology

    Directory of Open Access Journals (Sweden)

    Akshay Harlalka

    2016-01-01

    Full Text Available Reducing the time and cost involved in the product development is very important to stay competitive in the market. Design for Manufacturing and Assembly (DFMA is a cost-reduction framework for designers to evaluate manufacturing aspects of a product design. A case study on an in-market food processor, this paper aims to demonstrate the significance of DFMA implementation on an Indian consumer product. Even though many DFMA case studies have been published till date, very few have dealt with the Indian consumer durables category. In this paper, various cost-reduction opportunities are identified in the design of a food processor manufactured by a reputed company in India. Using the DFMA study, design ideas are developed with an objective of reducing the overall manufacturing cost of the product. As a result of DFMA implementation, significant improvement in terms of the product’s architecture, assembly time and design efficiency is identified. Overall cost reduction of 0.25 USD (United States Dollar was achieved and an improvement in the Design for Assembly (DFA index from 15.99 to 19.93 is reported. This procedure utilized in this paper can be adopted for any consumer durable products of similar type and design improvements and cost reduction can be achieved.

  11. Assessing the costs attributed to project delay during project pre-construction stages.

    Science.gov (United States)

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  12. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    Science.gov (United States)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  13. A supply chain cost reduction framework for the South African mobile phone industry

    Directory of Open Access Journals (Sweden)

    Musenga F. Mpwanya

    2017-03-01

    Aim: The purpose of this study is to explore supply chain costs in the South African mobile phone industry, and to develop a supply chain cost-reduction framework for the South African mobile phone industry. Setting: This study explores supply chain costs in four mobile phone companies operating in the South African mobile phone industry, of which three mobile network operators and one mobile retailing group. It uses semi-structured interview data collected in 2011. Method: This study adopted a qualitative case study design to understand supply chain costs and develop a supply chain cost-reduction framework for the South African mobile phone industry. Eight semi-structured interviews with managers of mobile phone companies were conducted. The data were analysed with the help of Atlas.ti, using an adapted three-phased analytical framework as suggested by Miles and Huberman (1994 and O’ Dwyer (2004. Results: The study found that consolidation of strategic relationships through collaboration and strategic alliances between MNOs and other supply chain players is one of the ways to drive costs down across the supply chain. Outsourcing of some of the support activities and retailers’ direct purchasing transactions from device manufacturers were also found to be other avenues for reducing supply chain costs in the industry. Conclusion: The study suggests that mobile network operators (MNOs need to consolidate their strategic relationships by increasing the share of the network infrastructure, and emphasising the need to strive for operational efficiencies. This combined effort should result in significant cost reductions across the supply chain. The findings of this study provided some avenues that managers of mobile-phone companies could consider to drive costs down supply chain-wide and service end-users at lower rates. The findings of this study could also help regulating authorities to get insights into supply chain cost reduction and develop appropriate

  14. A cost summary applicable to seismic construction and maintenance of nuclear safety related piping

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1995-01-01

    This paper presents a summary of costs applicable to nuclear power plant piping for an earthquake defined as 0.2 SSE-PGA as a function of three eras of initial construction: 1967--1974, 1974--1981 and 1981--1990. Costs have been presented for both new construction and maintenance in operating plants using both the original PSAR-FSAR design criteria and current SRP requirements. It is recommended that the cost information contained in this report be considered in evaluating the cost benefit relationships associated with current and proposed future changes in seismic design procedures applicable to safety-related piping systems

  15. Technological cost-reduction pathways for attenuator wave energy converters in the marine hydrokinetic environment.

    Energy Technology Data Exchange (ETDEWEB)

    Bull, Diana L; Ochs, Margaret Ellen

    2013-09-01

    This report considers and prioritizes the primary potential technical costreduction pathways for offshore wave activated body attenuators designed for ocean resources. This report focuses on technical research and development costreduction pathways related to the device technology rather than environmental monitoring or permitting opportunities. Three sources of information were used to understand current cost drivers and develop a prioritized list of potential costreduction pathways: a literature review of technical work related to attenuators, a reference device compiled from literature sources, and a webinar with each of three industry device developers. Data from these information sources were aggregated and prioritized with respect to the potential impact on the lifetime levelized cost of energy, the potential for progress, the potential for success, and the confidence in success. Results indicate the five most promising costreduction pathways include advanced controls, an optimized structural design, improved power conversion, planned maintenance scheduling, and an optimized device profile.

  16. Review comments on Environmental Analysis Cost Reduction Proposals (WIPP-DOE-136), July 1982

    International Nuclear Information System (INIS)

    Channell, J.K.

    1982-11-01

    The cost reduction proposals have the laudable goal of significantly reducing the total capital And operating cost connected with WIPP. Furthermore, since the proposed changes would reduce the size and operating rate of the project, they would be expected to have decreased environmental And socioeconomic impacts. However, some of these cost reduction proposals do decrease factors of safety in various components of the project or trade off one type of environmental detriment for another. The report does not contain sufficient detail to justify all of the conclusions reached; more discussion and quantitative information (including costs) is necessary in some cases. Also, there are places where the report is unclear or contradictory. Without a more detailed evaluation, EEG is unable to conclude that each of these cost reduction proposals either has a net environmental/health and safety benefit or a cost savings that justifies a net detriment. A revised Environmental Analysis (EA) should either include additional information or specifically reference backup documents where these conclusions have been justified. In addition, the EA needs to be revised to include the effect of the recently announced (11/18/82) decision by DOE to relocate the underground waste storage areas of the repository to the south

  17. Cost reduction possibilities for a heavy-ion accelerator for inertial confinement fusion

    International Nuclear Information System (INIS)

    Thayer, G.R.; Sims, J.R.; Henke, M.D.; Harris, D.B.; Dudziak, D.J.; Phillips, N.R.

    1987-10-01

    A design was produced for a single module in a cost-optimized accelerator appropriate for a commercial heavy-ion power plant. The goal of the study was to determine if the cost of the accelerator module could be reduced through design options, selection of materials, and manufacturing techniques. Independent cost estimates were obtained for the three main components of the module, and cost reductions of 20% from the cost calculated by the heavy-ion accelerator design/cost-minimization computer code LIACEP were identified. 3 refs., 23 figs

  18. Elaboration of technology organizational models of constructing high-rise buildings in plans of construction organization

    Science.gov (United States)

    Osipenkova, Irina; Simankina, Tatyana; Syrygina, Taisiia; Lukinov, Vitaliy

    2018-03-01

    This article represents features of the elaboration of technology organizational models of high-rise building construction in technology organizational documentation on the example of the plan of construction organization. Some examples of enhancing the effectiveness of high-rise building construction based on developments of several options of the organizational and technological plan are examined. Qualitative technology organizational documentation allows to increase the competitiveness of construction companies and provides prime cost of construction and assembly works reductions. Emphasis is placed on the necessity to comply with the principle of comprehensiveness of engineering, scientific and research works, development activities and scientific and technical support.

  19. Carbon Emission Reduction with Capital Constraint under Greening Financing and Cost Sharing Contract.

    Science.gov (United States)

    Qin, Juanjuan; Zhao, Yuhui; Xia, Liangjie

    2018-04-13

    Motivated by the industrial practices, this work explores the carbon emission reductions for the manufacturer, while taking into account the capital constraint and the cap-and-trade regulation. To alleviate the capital constraint, two contracts are analyzed: greening financing and cost sharing. We use the Stackelberg game to model four cases as follows: (1) in Case A1, the manufacturer has no greening financing and no cost sharing; (2) in Case A2, the manufacturer has greening financing, but no cost sharing; (3) in Case B1, the manufacturer has no greening financing but has cost sharing; and, (4) in Case B2, the manufacturer has greening financing and cost sharing. Then, using the backward induction method, we derive and compare the equilibrium decisions and profits of the participants in the four cases. We find that the interest rate of green finance does not always negatively affect the carbon emission reduction of the manufacturer. Meanwhile, the cost sharing from the retailer does not always positively affect the carbon emission reduction of the manufacturer. When the cost sharing is low, both of the participants' profits in Case B1 (under no greening finance) are not less than that in Case B2 (under greening finance). When the cost sharing is high, both of the participants' profits in Case B1 (under no greening finance) are less than that in Case B2 (under greening finance).

  20. Carbon Emission Reduction with Capital Constraint under Greening Financing and Cost Sharing Contract

    Science.gov (United States)

    Qin, Juanjuan; Zhao, Yuhui; Xia, Liangjie

    2018-01-01

    Motivated by the industrial practices, this work explores the carbon emission reductions for the manufacturer, while taking into account the capital constraint and the cap-and-trade regulation. To alleviate the capital constraint, two contracts are analyzed: greening financing and cost sharing. We use the Stackelberg game to model four cases as follows: (1) in Case A1, the manufacturer has no greening financing and no cost sharing; (2) in Case A2, the manufacturer has greening financing, but no cost sharing; (3) in Case B1, the manufacturer has no greening financing but has cost sharing; and, (4) in Case B2, the manufacturer has greening financing and cost sharing. Then, using the backward induction method, we derive and compare the equilibrium decisions and profits of the participants in the four cases. We find that the interest rate of green finance does not always negatively affect the carbon emission reduction of the manufacturer. Meanwhile, the cost sharing from the retailer does not always positively affect the carbon emission reduction of the manufacturer. When the cost sharing is low, both of the participants’ profits in Case B1 (under no greening finance) are not less than that in Case B2 (under greening finance). When the cost sharing is high, both of the participants’ profits in Case B1 (under no greening finance) are less than that in Case B2 (under greening finance). PMID:29652859

  1. Reductions in greenhouse gas emissions and cost by shipping at lower speeds

    International Nuclear Information System (INIS)

    Lindstad, Haakon; Asbjornslett, Bjorn E.; Stromman, Anders H.

    2011-01-01

    CO 2 emissions from maritime transport represent a significant part of total global greenhouse gas (GHG) emissions. According to the International Maritime Organization (), maritime transport emitted 1046 million tons (all tons are metric) of CO 2 in 2007, representing 3.3% of the world's total CO 2 emissions. The International Maritime Organization (IMO) is currently debating both technical and market-based measures for reducing greenhouse gas emissions from shipping. This paper presents investigations on the effects of speed reductions on the direct emissions and costs of maritime transport, for which the selection of ship classes was made to facilitate an aggregated representation of the world fleet. The results show that there is a substantial potential for reducing CO 2 emissions in shipping. Emissions can be reduced by 19% with a negative abatement cost (cost minimization) and by 28% at a zero abatement cost. Since these emission reductions are based purely on lower speeds, they can in part be performed now. - Highlights: → We investigates the effects of speed reductions for maritime transport. → The selection of ship classes represent the words fleet. → The transport volumes are kept constant. → The model includes both cost and emissions as a function of speed. → The results show that there is a substantial potential for reducing CO 2 emissions from shipping.

  2. Energy cost reduction in oil pipeline

    Energy Technology Data Exchange (ETDEWEB)

    Limeira, Fabio Machado; Correa, Joao Luiz Lavoura; Costa, Luciano Macedo Josino da; Silva, Jose Luiz da; Henriques, Fausto Metzger Pessanha [Petrobras Transporte S.A. (TRANSPETRO), Rio de Janeiro, RJ (Brazil)

    2012-07-01

    One of the key questions of modern society consists on the rational use of the planet's natural resources and energy. Due to the lack of energy, many companies are forced to reduce their workload, especially during peak hours, because residential demand reaches its top and there is not enough energy to fulfill the needs of all users, which affects major industries. Therefore, using energy more wisely has become a strategic issue for any company, due to the limited supply and also for the excessive cost it represents. With the objective of saving energy and reducing costs for oil pipelines, it has been identified that the increase in energy consumption is primordially related to pumping stations and also by the way many facilities are operated, that is, differently from what was originally designed. Realizing this opportunity, in order to optimize the process, this article intends to examine the possibility of gains evaluating alternatives regarding changes in the pump scheme configuration and non-use of pump stations at peak hours. Initially, an oil pipeline with potential to reduce energy costs was chosen being followed by a history analysis, in order to confirm if there was sufficient room to change the operation mode. After confirming the pipeline choice, the system is briefly described and the literature is reviewed, explaining how the energy cost is calculated and also the main characteristics of a pumping system in series and in parallel. In that sequence, technically feasible alternatives are studied in order to operate and also to negotiate the energy demand contract. Finally, costs are calculated to identify the most economical alternative, that is, for a scenario with no increase in the actual transported volume of the pipeline and for another scenario that considers an increase of about 20%. The conclusion of this study indicates that the chosen pipeline can achieve a reduction on energy costs of up to 25% without the need for investments in new

  3. Non-Hardware ("Soft") Cost-Reduction Roadmap for Residential and Small Commercial Solar Photovoltaics, 2013-2020

    Energy Technology Data Exchange (ETDEWEB)

    Ardani, K.; Seif, D.; Margolis, R.; Morris, J.; Davidson, C.; Truitt, S.; Torbert, R.

    2013-08-01

    The objective of this analysis is to roadmap the cost reductions and innovations necessary to achieve the U.S. Department of Energy (DOE) SunShot Initiative's total soft-cost targets by 2020. The roadmap focuses on advances in four soft-cost areas: (1) customer acquisition; (2) permitting, inspection, and interconnection (PII); (3) installation labor; and (4) financing. Financing cost reductions are in terms of the weighted average cost of capital (WACC) for financing PV system installations, with real-percent targets of 3.0% (residential) and 3.4% (commercial).

  4. Cost reduction with maintenance ECT in refractory bipolar disorder.

    Science.gov (United States)

    Bonds, C; Frye, M A; Coudreaut, M F; Cunningham, M; Spearing, M; McGuire, M; Guze, B

    1998-03-01

    A case report of outpatient maintenance electroconvulsive therapy (ECT) is presented in a patient with bipolar disorder type I refractory to conventional medication treatment but responsive to ECT. A cost comparison is made showing substantial savings when outpatient maintenance ECT is used in lieu of inpatient hospitalization with ECT. A detailed life chart illustrating multiple medication trials that failed to stabilize the patient accompanies the financial summary. This case highlights the advantages of outpatient maintenance ECT for bipolar depression particularly with regard to safety, efficacy, and significant health care cost reduction.

  5. Construction Costs Assessment of Structural Systems for Low-Rise and Social Welfare Housing

    Directory of Open Access Journals (Sweden)

    Carrillo Julián

    2015-09-01

    Full Text Available A comparative analysis of the costs related to the construction of low-rise, low-cost and social welfare housing was carried out. The study included three of the most commonly used structural systems for low-rise housing in Latin America, such as the traditional system of confined masonry walls, concrete walls conventionally reinforced with welded-wire meshes and concrete walls reinforced with steel fiber. The cost comparison was carried out by budgets analysis, which were performed based on construction quantities, unit prices and particular items for each structural system. It was found in the study that, from an economic point of view, the systems of concrete walls reinforced with welded-wire meshes or steel fibers are more advantageous than confined masonry systems. In addition, the integral comparison of the three structural systems demonstrates that the industrialized system of steel fiber reinforced concrete walls allows obtaining greater advantages of cleaning and sustainability, faster construction, lower cost and a more attractive scenario for builders investing in such projects.

  6. Cost-effectiveness analysis of salt reduction policies to reduce coronary heart disease in Syria, 2010-2020.

    Science.gov (United States)

    Wilcox, Meredith L; Mason, Helen; Fouad, Fouad M; Rastam, Samer; al Ali, Radwan; Page, Timothy F; Capewell, Simon; O'Flaherty, Martin; Maziak, Wasim

    2015-01-01

    This study presents a cost-effectiveness analysis of salt reduction policies to lower coronary heart disease in Syria. Costs and benefits of a health promotion campaign about salt reduction (HP); labeling of salt content on packaged foods (L); reformulation of salt content within packaged foods (R); and combinations of the three were estimated over a 10-year time frame. Policies were deemed cost-effective if their cost-effectiveness ratios were below the region's established threshold of $38,997 purchasing power parity (PPP). Sensitivity analysis was conducted to account for the uncertainty in the reduction of salt intake. HP, L, and R+HP+L were cost-saving using the best estimates. The remaining policies were cost-effective (CERs: R=$5,453 PPP/LYG; R+HP=$2,201 PPP/LYG; R+L=$2,125 PPP/LYG). R+HP+L provided the largest benefit with net savings using the best and maximum estimates, while R+L was cost-effective with the lowest marginal cost using the minimum estimates. This study demonstrated that all policies were cost-saving or cost effective, with the combination of reformulation plus labeling and a comprehensive policy involving all three approaches being the most promising salt reduction strategies to reduce CHD mortality in Syria.

  7. Current practices of construction waste reduction through 3R practice among contractors in malaysia: Case study in penang

    Science.gov (United States)

    Ng, L. S.; Tan, L. W.; Seow, T. W.

    2017-11-01

    The effectiveness of the implementation of construction waste reduction through 3R reflects the sustainability in construction waste management. Weak implementation of construction waste reduction through 3R among contractors will lead to unsustainable construction waste management. Increase in construction waste on landfills is critical especially on islands where land is very limited for solid waste disposal. This aim of this paper is to investigate current practice of construction waste reduction through 3R practice among contractors in Penang, Malaysia. The findings reported herein is based on feedbacks from 143 construction contractors of grade CIDB G7, G6 and G5 in Penang and experts from Penang Local Authority, CIDB in Penang and its Headquarters, National Solid Waste Management Department, and Headquarters of Solid Waste and Public Cleansing Management Corporation. Interviews and questionnaire surveys have been found that 3R practice is not mandatory in construction waste management in Penang. Only 39.8% construction contractors practiced 3R in managing their waste. Therefore, 3R practices should be emphasized in construction industry. Reducing wastes through 3R practices in construction industry is a way forward towards sustainable construction waste management especially in expanding the lifetime of landfill.

  8. AES, Automated Construction Cost Estimation System

    International Nuclear Information System (INIS)

    Holder, D.A.

    1995-01-01

    A - Description of program or function: AES (Automated Estimating System) enters and updates the detailed cost, schedule, contingency, and escalation information contained in a typical construction or other project cost estimates. It combines this information to calculate both un-escalated and escalated and cash flow values for the project. These costs can be reported at varying levels of detail. AES differs from previous versions in at least the following ways: The schedule is entered at the WBS-Participant, Activity level - multiple activities can be assigned to each WBS-Participant combination; the spending curve is defined at the schedule activity level and a weighing factor is defined which determines percentage of cost for the WBS-Participant applied to the schedule activity; Schedule by days instead of Fiscal Year/Quarter; Sales Tax is applied at the Line Item Level- a sales tax codes is selected to indicate Material, Large Single Item, or Professional Services; a 'data filter' has been added to allow user to define data the report is to be generated for. B - Method of solution: Average Escalation Rate: The average escalation for a Bill of is calculated in three steps. 1. A table of quarterly escalation factors is calculated based on the base fiscal year and quarter of the project entered in the estimate record and the annual escalation rates entered in the Standard Value File. 2. The percentage distribution of costs by quarter for the Bill of Material is calculated based on the schedule entered and the curve type. 3. The percent in each fiscal year and quarter in the distribution is multiplied by the escalation factor for the fiscal year and quarter. The sum of these results is the average escalation rate for that Bill of Material. Schedule by curve: The allocation of costs to specific time periods is dependent on three inputs, starting schedule date, ending schedule date, and the percentage of costs allocated to each quarter. Contingency Analysis: The

  9. Major cost savings associated with biologic dose reduction in patients with inflammatory arthritis.

    LENUS (Irish Health Repository)

    Murphy, C L

    2015-01-01

    The purpose of this study was to explore whether patients with Inflammatory Arthritis (IA) (Rheumatoid Arthritis (RA), Psoriatic Arthritis (PsA) or Ankylosing Spondylitis (AS)) would remain in remission following a reduction in biologic dosing frequency and to calculate the cost savings associated with dose reduction. This prospective non-blinded non-randomised study commenced in 2010. Patients with Inflammatory Arthritis being treated with a biologic agent were screened for disease activity. A cohort of those in remission according to standardized disease activity indices (DAS28 < 2.6, BASDAI < 4) was offered a reduction in dosing frequency of two commonly used biologic therapies (etanercept 50 mg once per fortnight instead of weekly, adalimumab 40 mg once per month instead of fortnightly). Patients were assessed for disease activity at 3, 6, 12, 18 and 24 months following reduction in dosing frequency. Cost saving was calculated. 79 patients with inflammatory arthritis in remission were recruited. 57% had rheumatoid arthritis (n = 45), 13% psoriatic arthritis (n = 10) and 30% ankylosing spondylitis (n = 24). 57% (n = 45) were taking etanercept and 43% (n = 34) adalimumab. The percentage of patients in remission at 24 months was 56% (n = 44). This resulted in an actual saving to the state of approximately 600,000 euro over two years. This study demonstrates the reduction in biologic dosing frequency is feasible in Inflammatory Arthritis. There was a considerable cost saving at two years. The potential for major cost savings in biologic usage should be pursued further.

  10. Does mitigation save? Reviewing cost-benefit analyses of disaster risk reduction

    OpenAIRE

    Shreve, Cheney M.; Kelman, Ilan

    2014-01-01

    The benefit-cost-ratio (BCR), used in cost-benefit analysis (CBA), is an indicator that attempts to summarize the overall value for money of a project. Disaster costs continue to rise and the demand has increased to demonstrate the economic benefit of disaster risk reduction (DRR) to policy makers. This study compiles and compares original CBA case studies reporting DRR BCRs, without restrictions as to hazard type, location, scale, or other parameters. Many results were identified supporting ...

  11. Reduction of Total Ownership Costs (R-TOC) Best Practices Guide

    National Research Council Canada - National Science Library

    Reed, Danny

    2003-01-01

    The purpose of the Reduction of Total Ownership Costs (R-TOC) program is to achieve readiness improvements in weapon systems by improving the reliability of the systems or the efficiency of the processes used to support...

  12. Cost reduction has priority in solar cell research

    International Nuclear Information System (INIS)

    Van Zolingen, R.J.C.; Sinke, W.C.

    1993-01-01

    The main topic in the research and development of photovoltaic cells is cost reduction. Although new materials, improved techniques and increasing efficiency are promising aspects of the clean and sustainable option of a photovoltaic conversion of sunlight to produce electricity at a large scale, the high prices form an obstacle. Photovoltaic conversion is at least a factor three too expensive compared to the conventional power generation techniques by means of fossil fuels. Attention is paid to the theoretical maximum efficiency of photovoltaic conversion, the efficiencies realized sofar, the importance of thin film solar cells, the payback period of photovoltaic modules, the environmental impacts of using photovoltaic cells, and finally the costs. 2 figs., 1 ill., 2 tabs., 6 refs

  13. Low-cost risk reduction strategy for small workplaces: how can we spread good practices?

    Science.gov (United States)

    Kogi, K

    2006-01-01

    Recent advances in health risk reduction approaches are examined based on inter-country networking experiences. A noteworthy progress is the wider application of low-cost improvements to risk reduction particularly in small enterprises and agriculture in both industrially developing and developed countries. This is helped by the readiness of managers and workers to implement these improvements despite many constraints. Typical improvements include mobile racks, simple workstation changes, screening hazards, better welfare facilities and teamwork arrangements. In view of the complex circumstances of work-related health risks, it is important to know whether a low-cost strategy can advance risk reduction practices effectively and what support measures are necessary. It is confirmed that the strategy can overcome related constraints through its advantages. Main advantages lie in (a) the facilitation of improved practices in multiple technical areas, (b) the strengthening of realistic stepwise risk reduction, and (c) the enhanced multiplier effects through training of local trainers. Action-oriented risk assessment tools, such as action checklists and low-cost improvement guides, can encourage risk-reducing measures adjusted to each local situation. It is suggested to spread the low-cost risk reduction strategy for improving small workplaces in diversified settings with the support of these locally tailored tools.

  14. Methods for reduction of the period for construction and commissioning of NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2004-01-01

    The process of construction of NPP unit is associated with significant amount of engineering, civil construction works, equipment installation and testing works. In order to achieve better economical results from the point of view of the investor, it will be a benefit if the time period for construction and commissioning of the unit is reduced. In order to realize such reduction of the needed time it is possible to utilize some new approaches for installation of heavy equipment, utilization of prefabricated in advance composite modules of equipment and application of new types of construction equipment and techniques. In such way the commissioning period can be reduced, and high quality of the installation works can be achieved. (author)

  15. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    You, Y. M. [PHILOSOPHIA, Inc., Seoul (Korea, Republic of); Suh, K. Y. [Seoul National Univ., Seoul (Korea, Republic of)

    2009-10-15

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4{sup +}D) Technology{sup TM} resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4{sup +}D Technology{sup TM} in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4{sup +}D Technology{sup TM} anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4{sup +}D Technology{sup TM} lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space.

  16. Digital Technology for Construction Period Reduction of Nuclear Power Plants

    International Nuclear Information System (INIS)

    You, Y. M.; Suh, K. Y.

    2009-01-01

    PHILOSOPHIA, Inc. and Seoul National University have jointly developed a first-of-a-kind engineering (FOAKE) solution. The solution lends itself to the four-plus-dimensional (4 + D) Technology TM resorting to three -dimensional (3D) computer-aided design (CAD) digital mockup (DMU). The aim is to minimize the working hours via process optimization by real-time exchange of design and process information in the ubiquitous system. The 4 + D Technology TM in the 3D virtual reality (VR) space and time plus cost coordinates, is developed to reduce the construction time as well as cost of nuclear power plants (NPPs) by optimizing the manufacturing procedure and construction process. The 4 + D Technology TM anchored to the 3D CAD DMU allows the interference of the NPP components to be checked upon early in the design stage, and the process sequences to be optimized. Moreover, its ergonomic and robotic technologies enable simulation of all the aspects of the workers, robots and machines involved in the construction process. One of the greatest advantages of the 4 + D Technology TM lies in that any change of the overall process procedures can virtually be tested. On the other hand, it shall financially be unbearable to alter the procedures consisting of plenty of structures and components, complicated detailed processes and long work hours in the physical space

  17. Construction of cost effective homebuilt spin coater for coating ...

    African Journals Online (AJOL)

    We report the construction of a cost effective and low power consumption spin coater from a direct current (DC) brushless motor. The DC mechanical component is widdely available in the central processing unit (CPU) cooler. This set up permits simple operation where the DC voltage can be controlled manually in order to ...

  18. Nuclear power generation as seen from construction aspect

    International Nuclear Information System (INIS)

    Osaki, Yorihiko

    1984-01-01

    The measures to vitalize atomic energy industry in low economical growth age are grasped from the viewpoint of heightening the quality of technology, and the improvement of the economical efficiency of nuclear power generation as seen from construction aspect is discussed. By 2000, the nuclear power generation in Japan will be increased by about four times to 62 million kW, and the proportion of nuclear power increases steadily. Recently, the nuclear power stations in Japan have been stably operated at high level, and the capacity ratio has exceeded 70 %. However, the power generation cost tends to rise, and it is feared that the economical advantage over thermal power will be lost. Recently, the construction cost of nuclear power plants has continued to rise, which causes the high cost of nuclear power. The reason of the high construction cost is in short too much quantity of materials and long construction period. As the proposal to reduce the construction cost, three stages of the rationalization are discussed, such as the rationalization of simulated earthquake for design and the improvement of reactor building design. The promotion of technical development is indispensable for the cost reduction. (Kako, I.)

  19. Ensuring Efficient Incentive and Disincentive Values for Highway Construction Projects: A Systematic Approach Balancing Road User, Agency and Contractor Acceleration Costs and Savings

    Directory of Open Access Journals (Sweden)

    Eul-Bum Lee

    2018-03-01

    Full Text Available United States State Highway Agencies (SHAs use Incentive/Disincentives (I/D to minimize negative impacts of construction on the traveling public through construction acceleration. Current I/D practices have the following short-comings: not standardized, over- or under-compensate contractors, lack of auditability result in disincentives that leave SHAs vulnerable to contractor claims and litigation and are based on agency costs/savings rather than contractor acceleration. Presented within this paper is an eleven-step I/D valuation process. The processes incorporate a US-nationwide RUC and agency cost calculation program, CA4PRS and a time-cost tradeoff I/D process. The incentive calculation used is the summation of the contractor acceleration and a reasonable contractor bonus (based on shared agency savings with an optional reduction of contractor’s own saving from schedule compression (acceleration. The process has a capability to be used both within the US and internationally with minor modifications, relies on historical costs, is simple and is auditable and repeatable. As such, it is a practical tool for optimizing I/D amounts and bridges the gap in existing literature both by its industry applicability, integrating the solution into existing SHA practices and its foundation of contractor acceleration costs.

  20. Cost reduction study for the LANL KrF laser-driven LMF design

    International Nuclear Information System (INIS)

    1989-01-01

    This report is in fulfillment of the deliverable requirements for the optical components portions of the LANL-KrF Laser-Driven LMF Design Cost Reduction Study. This report examines the future cost reductions that may accrue through the use of mass production, innovative manufacturing techniques, and new materials. Results are based on data collection and survey of optical component manufacturers, BDM experience, and existing cost models. These data provide a good representation of current methods and technologies from which future estimates can be made. From these data, a series of scaling relationships were developed to project future costs for a selected set of technologies. The scaling relationships are sensitive to cost driving parameters such as size and surface figure requirements as well as quantity requirements, production rate, materials, and manufacturing processes. In addition to the scaling relationships, descriptions of the selected processes were developed along with graphical representations of the processes. This report provides a useful tool in projecting the costs of advanced laser concepts at the component level of detail. A mix of the most diverse yet comparable technologies was chosen for this study. This yielded a useful, yet manageable number of variables to examine. The study has resulted in a first-order cost model which predicts the relative cost behavior of optical components within different variable constraints

  1. Radon reduction and radon-resistant construction demonstrations in New York state. Final report

    International Nuclear Information System (INIS)

    1991-02-01

    A survey of radon levels in New York State homes indicates that approximately 4.4 percent of the homes have long-term living area radon concentrations above the U.S. EPA guideline of four pCi/l. The project addressed the effectiveness of techniques to reduce the radon level in existing homes and to prevent the occurrence of high radon concentrations in new homes. The goal of the project was to demonstrate the effectiveness of radon reduction techniques in homes containing indoor radon concentrations of more than the current EPA guidelines of four pCi/l. At the same time, radon-resistant construction techniques were demonstrated in homes under construction to provide guidelines for houses being built in areas with a danger of high radon levels. The project demonstrated new radon mitigation techniques in homes containing indoor radon concentrations exceeding four pCi/l; assessed the value of previously installed radon reduction procedures, and demonstrated new radon-resistant construction methods

  2. Planning Costs in Certain Stage of the Life Cycle of Investment Activity of Construction Organization

    OpenAIRE

    Iakymchuk Iryna M.

    2017-01-01

    The article discusses the issues related to planning costs in certain stages of the life-cycle of investment activity of construction organization. It has been specified that cost management based on the life-cycle model of the investment project, which is being implemented by a construction organization, allows for a consistent improvement in the efficiency of the innovation process on the basis of a clear planning, as well as cost forecasting. This approach allows for the long-term effectiv...

  3. Effect of construction time, interest rate, and inflation on the capital cost of nuclear power plants

    International Nuclear Information System (INIS)

    Abel, P.S.; Greybeck, E.M.; Omberg, R.P.

    1981-09-01

    Cost estimates for nuclear power plants currently under construction are on the order of four billion dollars. It will be shown, in this paper, that this is a direct consequence of relatively high inflation rates and relatively long construction times. If either inflation rates or construction times, or a combination thereof, should decrease significantly, cost estimates for nuclear power plants could return to approximately two billion dollars

  4. Design, construction and testing of a low-cost flat plate solar energy ...

    African Journals Online (AJOL)

    A low-cost flat plate solar energy collector has been designed and constructed with locally available materials such as mild steel and black paint of absorptance 0.94. On testing, an average daily efficiency of 55.6% was obtained. The methods are simple and illustrate the fact that construction of efficient collectors are ...

  5. FACTORS AFFECTING COST PERFORMANCE IN CONSTRUCTION PROJECTS WITHIN KELANTAN STATE IN MALAYSIA

    OpenAIRE

    ABDELNASER OMRAN; SITI NORHYDAYATON BINTI MAMAT

    2011-01-01

    This study investigates the factors affecting cost performance of construction projects in Kelantan State located in the east-coast part of Malaysia. It draws on relevant previous research in the theory of work on cost performance. Thirty-three contractors companies with different working grades in the state of Kelantan were participated in the study. Data were collected from the contractors using a questionnaire survey. The results indicated that the success factors affecting the cost perfor...

  6. An Approach for Measuring Reductions in Operations, Maintenance, and Energy Costs: Baseline Measures of Construction Industry Practices for the National Construction Goals.

    Science.gov (United States)

    Chapman, Robert E.; Rennison, Roderick

    The Construction and Building Subcommittee of the National Science and Technology Council (NSTC) has established seven National Construction Goals for the construction industry and is developing baseline measures for current practices and progress with respect to each goal. This document provides a detailed set of baseline measures for the NSTC…

  7. Construction cost impacts related to manpower, material, and equipment factors in contractor firms perspective

    Science.gov (United States)

    Husin, Saiful; Abdullah, Riza, Medyan; Afifuddin, Mochammad

    2017-11-01

    Risk can be defined as consequences which possible happened inscrutably. Although an activity has planned as good as possible, but it keep contains uncertainty. Implementation of construction project was encountering various risk impacts from a number of risk factors. This study was intended to analyze the impacts of construction cost to for contractor firms as construction project executor related to the factors of manpower, material and equipment. The study was using data obtained from questionnaires distributed to 15 large qualification contractor firms. The period of study classified into conflict period (2000-2004), post tsunami disaster rehabilitation and reconstruction period (2005-2009), and post rehabilitation and reconstruction period (2010-present). The statistical analysis of severity index and variance used to analyze the data. The three risk factors reviewed generally affected the cost in a medium impact. The high impact occurred in minor variables, which are `increase in material prices', `theft of materials', and `the fuel scarcity'. In overall, the three risk factors and the observed period contributed significant impact on construction costs.

  8. Long-term, low-level radwaste volume-reduction strategies. Volume 4. Waste disposal costs. Final report

    International Nuclear Information System (INIS)

    Sutherland, A.A.; Adam, J.A.; Rogers, V.C.; Merrell, G.B.

    1984-11-01

    Volume 4 establishes pricing levels at new shallow land burial grounds. The following conclusions can be drawn from the analyses described in the preceding chapters: Application of volume reduction techniques by utilities can have a significant impact on the volumes of wastes going to low-level radioactive waste disposal sites. Using the relative waste stream volumes in NRC81 and the maximum volume reduction ratios provided by Burns and Roe, Inc., it was calculated that if all utilities use maximum volume reduction the rate of waste receipt at disposal sites will be reduced by 40 percent. When a disposal site receives a lower volume of waste its total cost of operation does not decrease by the same proportion. Therefore the average cost for a unit volume of waste received goes up. Whether the disposal site operator knows in advance that he will receive a smaller amount of waste has little influence on the average unit cost ($/ft) of the waste disposed. For the pricing algorithm postulated, the average disposal cost to utilities that volume reduce is relatively independent of whether all utilities practice volume reduction or only a few volume reduce. The general effect of volume reduction by utilities is to reduce their average disposal site costs by a factor of between 1.5 to 2.5. This factor is generally independent of the size of the disposal site. The largest absolute savings in disposal site costs when utilities volume reduce occurs when small disposal sites are involved. This results from the fact that unit costs are higher at small sites. Including in the pricing algorithm a factor that penalizes waste generators who contribute larger amounts of the mobile nuclides 3 H, 14 C, 99 Tc, and 129 I, which may be the subject of site inventory limits, lowers unit disposal costs for utility wastes that contain only small amounts of the nuclides and raises unit costs for other utility wastes

  9. The impact of unit cost reductions on gross profit: Increasing or decreasing returns?

    Directory of Open Access Journals (Sweden)

    Ely Dahan

    2011-09-01

    Full Text Available We suggest that marketers actively participate in reducing unit costs during new product development, consistent with the theme of integrated marketing and manufacturing. Most marketing managers misjudge the impact on gross profit of reducing variable unit manufacturing costs, mistakenly believing that such cost reductions yield decreasing or linear returns while they actually generate increasing returns.

  10. Levelized cost-risk reduction prioritization of waste disposal options

    International Nuclear Information System (INIS)

    Wilkinson, V.K.; Young, J.M.

    1992-01-01

    The prioritization of solid waste disposal options in terms of reduced risk to workers, the public, and the environment has recently generated considerable governmental and public interest. In this paper we address the development of a methodology to establish priorities for waste disposal options, such as incineration, landfills, long-term storage, waste minimization, etc. The study is one result of an overall project to develop methodologies for Probabilistic Risk Assessments (PRAs) of non-reactor nuclear facilities for the US Department of Energy. Option preferences are based on a levelized cost-risk reduction analysis. Option rankings are developed as functions of disposal option cost and timing, relative long- and short-term risks, and possible accident scenarios. We examine the annual costs and risks for each option over a large number of years. Risk, in this paper, is defined in terms of annual fatalities (both prompt and long-term) and environmental restoration costs that might result from either an accidental release or long-term exposure to both plant workers and the public near the site or facility. We use event timing to weigh both costs and risks; near-term costs and risks are discounted less than future expenditures and fatalities. This technique levels the timing of cash flows and benefits by converting future costs and benefits to present value costs and benefits. We give an example Levelized Cost-Benefit Analysis of incinerator location options to demonstrate the methodology and required data

  11. Reduction of cost of poor quality in nuclear fuel manufacturing

    International Nuclear Information System (INIS)

    Holmqvist, B.

    2000-01-01

    Within ABB reduction of Cost of Poor Quality (COPQ) has become an important process to focus quality improvement initiatives on bottom-line results. The process leads to improved bottom-line results, through cost savings, but it also leads to quality improvements in our processes, products and services. The traditional way of measuring and controlling COPQ in the production workshops is not enough. It is of vital importance to include other non-value creating costs as well, both internally, e.g. in the engineering work, and externally, in delivered products and purchased goods. ABB Atom has since a number of years used the COPQ process in the various steps of nuclear fuel manufacturing. The definition has been expanded to cover, for instance: Scrap, rework and deviations; Margin slippage; Warranty costs; Lack of supplier performance; Excess and obsolete inventory. Each of the COPQ elements has a responsible 'owner' within the management of the Nuclear Fuel Division. The owners form a COPQ task force, which is responsible for analyzing results, setting goals and initiating improvement actions. The COPQ result is updated each month and is presented to all employees in several ways, such as Intranet. For the various COPQ elements improvement initiatives have been implemented. The presentation will describe some of them, such as reduction of: Scrap, rework and deviations through a process with zero defect meetings, high level of process automation, statistical methods; Margin slippage through business process re-engineering; Warranty costs through an improved design review process and expanded testing of new products; Costs for lack in supplier performance through a new concept for supplier QA/QC. It is our strong belief that both ABB Atom and our Customers will benefit from the COPQ process since it leads to a higher quality for nuclear fuel and control rods and facilitates lower product prices. (author)

  12. Seeking the competitive advantage: it's more than cost reduction.

    Science.gov (United States)

    South, S F

    1999-01-01

    Most organizations focus considerable time and energy on reducing operating costs as a way to attain marketplace advantage. This strategy was not inappropriate in the past. To be competitive in the future, however, focus must be placed on other issues, not just cost reduction. The near future will be dominated by service industries, knowledge management, and virtual partnerships, with production optimization and flexibility, innovation, and strong partnerships defining those organizations that attain competitive advantage. Competitive advantage will reside in clarifying the vision and strategic plan, reviewing and redesigning work processes to optimize resources and value-added work, and creating change-ready environments and empowered workforces.

  13. Optimization planning for the construction of the U.S. EPR

    International Nuclear Information System (INIS)

    Phillips, M. K.

    2008-01-01

    As utilities and project developers in the United States embark on a new nuclear plant construction endeavor, the industry must have the confidence and support of all stakeholders. To gain this confidence and support, cost and schedule certainty must be established. Therein lies the challenge. The owner will insist that constructors and suppliers deliver new plants on time and within project budgets. This will be a significant effort given the limited number of qualified equipment and commodity suppliers, and a shortage of experienced craft and supervision. In an effort to manage construction risk and ensure cost and schedule certainty, the AREVA Construction Management Team has lead the development of a construction strategy that includes advanced construction methods and technologies such as 3-D modeling, detailed planning and scheduling, open-top construction, state-of-the-art fabrication practices, specialty transportation and lifting methods, and pre-assembly and modularization, otherwise referred to as construction optimization. Unlike off-shore platforms, industrial process plants, and ships where piping and components can be integrated into the steel building structure, optimized construction of nuclear plants must consider reinforced concrete walls and slabs that serve as the building structure, and provide radiation shielding and containment of nuclear systems. These differences in design and construction require a significantly different analysis approach that is focused on rooms of a building rather than the whole building or plant. This paper will focus on the process developed and currently being implemented by the U.S. EPR (Evolutionary Power Reactor) Construction Team to identify opportunities for optimization and then to evaluate and select the rooms or areas of the plant where pre-assembly or modularization will provide the greatest benefit to construction cost and schedule certainty. Key measures for comparison and selection are critical path

  14. Investor's experience with keeping fixed costs during the construction of the Temelin nuclear power plant

    International Nuclear Information System (INIS)

    Cecil, P.

    1990-01-01

    The introduction of fixed costs in the construction of the Temelin nuclear power plant should secure stabilization of budget cost and prevent its increase. The differences between the fixed costs method and the procedure used so far are briefly described. The introduction of fixed costs was to be followed by the corresponding legal regulations; however, the legal adjustment has not been carried out in the desired completeness. The reason is the difference in understanding the notion of fixed costs by the investor, the contractor and the designer. Another problem is the difference in the level and the detail of the initial project design and of the Soviet implementation designs. The investor believes that the introduction of fixed costs has not yet met with the desired response by organizations participating in the construction. (J.P.)

  15. Understanding the reductions in US corn ethanol production costs: an experience curve approach

    NARCIS (Netherlands)

    Hettinga, W.; Junginger, H.M.; Dekker, S.C.; Hoogwijk, M.; McAloon, A.; Hicks, K.

    2009-01-01

    The US is currently the world's largest ethanol producer. An increasing percentage is used as transportation fuel, but debates continue on its costs competitiveness and energy balance. In this study, technological development of ethanol production and resulting cost reductions are investigated by

  16. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...... convertingdeterministic benefit-cost ratios (BCRs) into stochasticinterval results. A new data collection (2009–2013) forms the empirical basis for any risk simulation embeddedwithin the so-calledUP database (UNITE project database),revealing the inaccuracy of both construction costs and demandforecasts. Accordingly...

  17. Cost Consideration and a Possible Construction Timeline of the CEPC-SPPC

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Weiren [Fermilab

    2015-04-01

    This paper discusses the cost consideration and a possible construction timeline of the CEPC-SPPC study based on a preliminary conceptual design that is being carried out at the Institute of High Energy Physics (IHEP) in China.

  18. Risk management study for the Hanford Site facilities: Risk reduction cost comparison for the retired Hanford Site facilities

    International Nuclear Information System (INIS)

    Coles, G.A.; Egge, R.G.; Senger, E.; Shultz, M.W.; Taylor, W.E.

    1994-02-01

    This document provides a cost-comparison evaluation for implementing certain risk-reduction measures and their effect on the overall risk of the 100 and 200 Area retired, surplus facilities. The evaluation is based on conditions that existed at the time the risk evaluation team performed facility investigations, and does not acknowledge risk-reduction measures that occurred soon after risk identification. This evaluation is one part of an overall risk management study for these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1450-km 2 Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30 km southeast of the 200 Area. This cost-comparison evaluation (1) determines relative costs for reducing risk to acceptable levels; (2) compares the cost of reducing risk using different risk-reduction options; and (3) compares the cost of reducing risks at different facilities. The result is an identification of the cost effective risk-reduction measures. Supporting information required to develop costs of the various risk-reduction options also is included

  19. Payroll costs not identified by phase in construction work done with no third subcontracted

    Directory of Open Access Journals (Sweden)

    Rubén Antonio González Franco

    2012-05-01

    Full Text Available The Social Insurance Regulations applicable to the construction companies with regard to meeting high work requires the owner to generate high for each construction phase and thus to check the amounts of materials, machinery and equipment, as well as labor applied at the same stage, all in order to validate that it complies 100% with the payment of worker-employer contributions by the employer, guidelines in the specific case of SMEs practice becomes more complex, controls as these companies have no proof phased costs in two areas in particular, as are exercised costs of materials and workmanship for housing, which is why this research aims to solve the problem of generating clear guidelines to comply with the verification of payment of contributions in the field of labor when it is exerciseddirectly, and through the application of direct interviews and questionnaires to the units of analysis consists of businessmen, representatives, directors or business accountants SMEs construction, staff of the National Chamber of construction Industry and the Mexican Social Security Institute head of the Department of construction, who will answer questions the same instrument provides, and with this it was determined that in fact the perception of these SMEs is required to leave a standard criterion for testing and would be more appropriate apportionment of costs proportionately based on hire dates and termination dates of the work keeping track of costs identifying overall, leaving an identification number in the working papers for further review by the authority.

  20. Construction Performance Optimization toward Green Building Premium Cost Based on Greenship Rating Tools Assessment with Value Engineering Method

    Science.gov (United States)

    Latief, Yusuf; Berawi, Mohammed Ali; Basten, Van; Riswanto; Budiman, Rachmat

    2017-07-01

    Green building concept becomes important in current building life cycle to mitigate environment issues. The purpose of this paper is to optimize building construction performance towards green building premium cost, achieving green building rating tools with optimizing life cycle cost. Therefore, this study helps building stakeholder determining building fixture to achieve green building certification target. Empirically the paper collects data of green building in the Indonesian construction industry such as green building fixture, initial cost, operational and maintenance cost, and certification score achievement. After that, using value engineering method optimized green building fixture based on building function and cost aspects. Findings indicate that construction performance optimization affected green building achievement with increasing energy and water efficiency factors and life cycle cost effectively especially chosen green building fixture.

  1. Cost reduction potentials of offshore wind power in Germany

    International Nuclear Information System (INIS)

    Hobohm, Jens; Krampe, Leonard; Peter, Frank

    2014-01-01

    Offshore wind power is a major hope for the German energy turnaround. However, it will only be possible to tap its cost reduction potentials if industry, the political leadership and the administrative authorities join forces to create the necessary preconditions. An important requirement for this capital-intensive technology are stable legal and political framework conditions. A recent study on the future shows what needs to be done.

  2. 48 CFR 52.215-11 - Price Reduction for Defective Certified Cost or Pricing Data-Modifications.

    Science.gov (United States)

    2010-10-01

    ... accordingly and the contract shall be modified to reflect the reduction. This right to a price reduction is... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Price Reduction for... CONTRACT CLAUSES Text of Provisions and Clauses 52.215-11 Price Reduction for Defective Certified Cost or...

  3. Annual Energy Usage Reduction and Cost Savings of a School: End-Use Energy Analysis

    Science.gov (United States)

    Alghoul, M. A.; Bakhtyar, B.; Asim, Nilofar; Sopian, K.

    2014-01-01

    Buildings are among the largest consumers of energy. Part of the energy is wasted due to the habits of users and equipment conditions. A solution to this problem is efficient energy usage. To this end, an energy audit can be conducted to assess the energy efficiency. This study aims to analyze the energy usage of a primary school and identify the potential energy reductions and cost savings. A preliminary audit was conducted, and several energy conservation measures were proposed. The energy conservation measures, with reference to the MS1525:2007 standard, were modelled to identify the potential energy reduction and cost savings. It was found that the school's usage of electricity exceeded its need, incurring an excess expenditure of RM 2947.42. From the lighting system alone, it was found that there is a potential energy reduction of 5489.06 kWh, which gives a cost saving of RM 2282.52 via the improvement of lighting system design and its operating hours. Overall, it was found that there is a potential energy reduction and cost saving of 20.7% when the energy conservation measures are earnestly implemented. The previous energy intensity of the school was found to be 50.6 kWh/m2/year, but can theoretically be reduced to 40.19 kWh/mm2/year. PMID:25485294

  4. HITACHI construction CAE system

    International Nuclear Information System (INIS)

    Yoshida, M.

    1994-01-01

    Construction and maintenance of nuclear power plants have important problems such as shortening the construction period and reducing the construction cost. Recently, the problem of insufficient construction labor has arisen, and as drastic strategic development has become a necessary counter-measure. The following four principles are included in the measures to be taken for efficient execution of the construction work within the short construction period: (1) reduction of on-site work and expansion of module block making, (2)improvement of the accuracy of the on-site work process, adjustment and expansion of the work in parallel with the construction process, (3)improvement of efficiency of the on-site work and mechanization and automation of the work, (4)improvement of the accuracy of the management of the construction. A three dimensional simulation system plant construction plan CAE, comprising five modules has been developed. A project management system was also developed to improve the accuracy and efficiency of management work in the field

  5. Public risk-reduction measures: cost-effectiveness from a global point-of-view

    International Nuclear Information System (INIS)

    Oliveira, L.F.S. de; Motta Barros, E.B. da; Fleming, P.V.; Rosa, L.P.

    1985-05-01

    A review of systemic or global approach to cost-effectiveness analysis of risk-reduction measures is presented, and its advantages and limitations are discussed. The method is applied for problem of the cost-effectiveness of increasing the Angra 3 reactor containment wall thickness from 60cm to 180cm thick, in case of a direct commercial aircraft crash on it. (Author) [pt

  6. Feasibility of perpetual pavement stage construction in China: A life cycle cost analysis

    Directory of Open Access Journals (Sweden)

    Zhongyin Guo

    2016-12-01

    Full Text Available The main objective of pavement design and management is to build sustainable pavement structure with minimum costs during its whole life. There are many uncertainties in the process of pavement design pertaining many of its variables, such as future traffic estimation, long time behavior of materials, future weights and types of traveling vehicles, availability of funds etc. Therefore, it is important to apply pavement stage construction technique during the process of pavement design and management to minimize the risk associated with these uncertainties. From the beginning of 2000, the research and application of perpetual asphalt pavement (PP technology has been deployed in China. The semi rigid base for asphalt pavement has been normally considered as typical component of high class highways in the design according to the Chinese experience since 1997. The research objective is to apply pavement stage construction for the evaluation of life cycle costs of Chinese perpetual and traditional semi rigid pavements using operational pavement management system in addition to examine its suitability for design and construction of more economical and durable flexible pavements. It has been found that the stage construction of asphalt layers in PP over semi rigid pavement foundation will create more sustainable and trusted pavement structures in spite of 2–5% increase in present total cost.

  7. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    International Nuclear Information System (INIS)

    El-Alaily, T.M.; El-Nimr, M.K.; Saafan, S.A.; Kamel, M.M.; Meaz, T.M.; Assar, S.T.

    2015-01-01

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability. - Highlights: • A low cost automated vibrating sample magnetometer VSM has been constructed. • The VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. • The VSM has been calibrated and tested by using some measured ferrite samples. • Our VSM lab-built new design proved success and reliability

  8. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    Energy Technology Data Exchange (ETDEWEB)

    El-Alaily, T.M., E-mail: toson_alaily@yahoo.com [Physics Department, Faculty of Science, Tanta University, Tanta (Egypt); El-Nimr, M.K.; Saafan, S.A.; Kamel, M.M.; Meaz, T.M. [Physics Department, Faculty of Science, Tanta University, Tanta (Egypt); Assar, S.T. [Engineering Physics and Mathematics Department, Faculty of Engineering, Tanta University, Tanta (Egypt)

    2015-07-15

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability. - Highlights: • A low cost automated vibrating sample magnetometer VSM has been constructed. • The VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. • The VSM has been calibrated and tested by using some measured ferrite samples. • Our VSM lab-built new design proved success and reliability.

  9. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  10. COST OF SELECTIVE CATALYTIC REDUCTION (SCR) APPLICATION FOR NOX CONTROL ON COAL-FIRED BOILERS

    Science.gov (United States)

    The report provides a methodology for estimating budgetary costs associated with retrofit applications of selective catalytic reduction (SCR) technology on coal-fired boilers. SCR is a postcombustion nitrogen oxides (NOx) control technology capable of providing NOx reductions >90...

  11. The use of 3D CADD (Computer Aided Design and Drafting) models in operation and maintenance cost reduction

    International Nuclear Information System (INIS)

    Didsbury, R.; Bains, N.; Cho, U.Y.

    1998-01-01

    The use of three dimensional(3D) computer-aided design and drafting(CADD) models, and the associated information technology and databases, in the engineering and construction phases of large projects is well established and yielding significant improvements in project cost, schedule and quality. The information contained in these models can also be extremely valuable to operating plants, particularly when the visual and spatial information contained in the 3D models is interfaced to other plant information databases. Indeed many plant owners and operators in the process and power industries are already using this technology to assist with such activities as plant configuration management, staff training, work planning and radiation protection. This paper will explore the application of 3D models and the associated databases in an operating plant environment and describe the resulting operational benefits and cost reduction benefits. Several industrial experience case studies will be presented along with suggestions for further future applications. (author). 4 refs., 1 tab., 8 figs

  12. Beyond the learning curve: factors influencing cost reductions in photovoltaics

    International Nuclear Information System (INIS)

    Nemet, Gregory F.

    2006-01-01

    The extent and timing of cost-reducing improvements in low-carbon energy systems are important sources of uncertainty in future levels of greenhouse-gas emissions. Models that assess the costs of climate change mitigation policy, and energy policy in general, rely heavily on learning curves to include technology dynamics. Historically, no energy technology has changed more dramatically than photovoltaics (PV), the cost of which has declined by a factor of nearly 100 since the 1950s. Which changes were most important in accounting for the cost reductions that have occurred over the past three decades? Are these results consistent with the notion that learning from experience drove technical change? In this paper, empirical data are assembled to populate a simple model identifying the most important factors affecting the cost of PV. The results indicate that learning from experience, the theoretical mechanism used to explain learning curves, only weakly explains change in the most important factors-plant size, module efficiency, and the cost of silicon. Ways in which the consideration of a broader set of influences, such as technical barriers, industry structure, and characteristics of demand, might be used to inform energy technology policy are discussed

  13. Explaining the reductions in US corn ethanol processing costs: Testing competing hypotheses

    International Nuclear Information System (INIS)

    Chen Xiaoguang; Khanna, Madhu

    2012-01-01

    The processing costs of US corn ethanol have declined by 45% since 1983 as production volumes have increased seventeen-fold. We investigate the role of various factors that could explain this, including economies of scale, cumulative experience, induced innovation in response to rising input prices, an autonomous technological change, and trade induced competition from imported ethanol. Using data on dry-mill ethanol processing costs over the 1983–2005 period, we find evidence to show that US corn ethanol production exhibited decreasing returns to scale, that learning by doing played an important role in reducing these processing costs with a learning rate of 0.25, and that sugarcane ethanol imports contributed to making the corn ethanol industry more competitive. Other factors such as the rising prices of energy and labor did induce lower processing costs, but the effect is not statistically significant. The inclusion of these competing explanations for the reduction in processing costs of US corn ethanol lead to a significantly higher learning rate than otherwise, and this learning rate is found to be robust across specifications. - Highlights: ► We investigate the role of various factors that could explain the reduction in US corn ethanol processing costs over the period 1983–2005. ► We find that US corn ethanol production exhibited decreasing returns to scale. ► Learning by doing played an important role in reducing these costs with a learning rate of 0.25. ► Sugarcane ethanol imports contributed to making the corn ethanol industry more competitive. ► Rising prices of energy and labor did induce lower processing costs, but the effect is not statistically significant.

  14. Alternative ceramic circuit constructions for low cost, high reliability applications

    International Nuclear Information System (INIS)

    Modes, Ch.; O'Neil, M.

    1997-01-01

    The growth in the use of hybrid circuit technology has recently been challenged by recent advances in low cost laminate technology, as well as the continued integration of functions into IC's. Size reduction of hybrid 'packages' has turned out to be a means to extend the useful life of this technology. The suppliers of thick film materials technology have responded to this challenge by developing a number of technology options to reduce circuit size, increase density, and reduce overall cost, while maintaining or increasing reliability. This paper provides an overview of the processes that have been developed, and, in many cases are used widely to produce low cost, reliable microcircuits. Comparisons of each of these circuit fabrication processes are made with a discussion of advantages and disadvantages of each technology. (author)

  15. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    Science.gov (United States)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  16. Explaining the experience curve: Cost reductions of Brazilian ethanol from sugarcane

    International Nuclear Information System (INIS)

    van den Wall Bake, J.D.; Junginger, M.; Faaij, A.; Poot, T.; Walter, A.

    2009-01-01

    Production costs of bio-ethanol from sugarcane in Brazil have declined continuously over the last three decades. The aims of this study are to determine underlying reasons behind these cost reductions, and to assess whether the experience curve concept can be used to describe the development of feedstock costs and industrial production costs. The analysis was performed using average national costs data, a number of prices (as a proxy for production costs) and data on annual Brazilian production volumes. Results show that the progress ratio (PR) for feedstock costs is 0.68 and 0.81 for industrial costs (excluding feedstock costs). The experience curve of total production costs results in a PR of 0.80. Cost breakdowns of sugarcane production show that all sub-processes contributed to the total, but that increasing yields have been the main driving force. Industrial costs mainly decreased because of increasing scales of the ethanol plants. Total production costs at present are approximately 340 US$/m ethanol 3 (16 US$/GJ). Based on the experience curves for feedstock and industrial costs, total ethanol production costs in 2020 are estimated between US$ 200 and 260/m 3 (9.4-12.2 US$/GJ). We conclude that using disaggregated experience curves for feedstock and industrial processing costs provide more insights into the factors that lowered costs in the past, and allow more accurate estimations for future cost developments. (author)

  17. Cost-effectiveness analysis of risk reduction at nuclear power plants

    International Nuclear Information System (INIS)

    Lochard, J.; Maccia, C.; Pages, P.

    1985-01-01

    Cost-effectiveness analysis of risk reduction is now widely accepted as a rational analytical framework to consistently address the resource allocation problem underlying any risk management process. This paper presents how this technique can be usefully applied to complex systems such as the management of radioactive releases from nuclear power plants into the environment. (orig.) [de

  18. Economic evaluation of volume reduction for Defense transuranic waste

    International Nuclear Information System (INIS)

    Brown, C.M.

    1982-03-01

    The economics of volume reduction of retrievably stored and newly generated DOE transuranic wastes are evaluated by comparing the costs of reduction of the wastes with the savings possible in transportation and disposal. A general approach to the comparison of TRU waste volume reduction costs and cost savings is developed, an initial set of cost data is established, conclusions to support selecting technologies and facilities for the disposal of DOE transuranic waste are developed. Section I outlines the analysis which considers seven types of volume reduction from incineration and compaction of combustibles to compaction, size reduction, shredding, melting, and decontamination of metals. The study considers the volume reduction of contact-handled, newly generated and retrievably stored DOE transuranic wastes. Section II of this report describes the analytical approach, assumptions, and flow of waste material through sites. Section III presents the waste inventories, disposal and transportation savings, and volume reduction techniques and costs. Section IV contains the results and conclusions of the study. The major conclusions drawn from the study are: For DOE sites with a small amount of waste requiring disposal ( 3 /year) the cost of volume reduction is greater than the transportation and disposal savings from volume reduction provided the waste requires little additional preparation to meet transportation and disposal criteria. Wastes that do not meet these criteria require site specific economic analysis outside the general evaluations of this study. For Idaho National Engineering Laboratory, incineration and metal shredding are cost-effective, provided a facility is to be constructed as a consequence of repackaging the fraction of stored waste which may require repackaging and immobilizing chemical process waste to meet disposal criteria

  19. Development of Innovative Construction Technologies for ABWRs

    International Nuclear Information System (INIS)

    Yamashita, T.; Fukuda, T.; Masuda, N.

    2002-01-01

    This paper describes an effort by Tokyo Electric Power Company (TEPCO) to shorten the construction time in a drastic manner for the Advanced Boiling Water Reactors (ABWR), thereby aiming at reducing construction costs. First an outline of the actual construction records for the five BWR Units and the two ABWR Units at the Kashiwazaki-Kariwa site is introduced along with the construction methods employed for these units. There is a continued trend in the reduction of construction time from Unit 1 to 7 owing to a number of improvements made to these units, and in particular it is noteworthy that the drastic reduction was accomplished due to the change in reactor type from BWR to ABWR. Explained next is an on-going effort for the next ABWR and the following next generation of ABWRs to further shorten construction time. In this effort an emphasis is laid on the development of innovative construction methods by the adoption of steel plate/concrete composite structures (SC Structure), and the application of those structures even to containment vessel (so-called SCCV). This work is being conducted as part of TEPCO's research and development for the next generation ABWRs (ABWR II). Presently it is expected that the construction time from bedrock inspection to fuel loading could be shortened in a stepwise fashion to 38 and 31.5 months for the next ABWR and finally to 23 months for the next generation ABWR II, thus enabling a greatly reduced power generating cost and enhanced safety during construction. In addition to the above effort, a preliminary study has been performed concerning the application of base isolation systems to ABWR plants. From this study which is aimed at standardization, lowered cost and mitigation of engineering work, it was found that base isolation system effectively reduces seismic response and is instrumental in achieving the above-mentioned objectives. Therefore it can be said that the use of this system gives more freedom in selecting sites

  20. A comparative analysis of methods to represent uncertainty in estimating the cost of constructing wastewater treatment plants.

    Science.gov (United States)

    Chen, Ho-Wen; Chang, Ni-Bin

    2002-08-01

    Prediction of construction cost of wastewater treatment facilities could be influential for the economic feasibility of various levels of water pollution control programs. However, construction cost estimation is difficult to precisely evaluate in an uncertain environment and measured quantities are always burdened with different types of cost structures. Therefore, an understanding of the previous development of wastewater treatment plants and of the related construction cost structures of those facilities becomes essential for dealing with an effective regional water pollution control program. But deviations between the observed values and the estimated values are supposed to be due to measurement errors only in the conventional regression models. The inherent uncertainties of the underlying cost structure, where the human estimation is influential, are rarely explored. This paper is designed to recast a well-known problem of construction cost estimation for both domestic and industrial wastewater treatment plants via a comparative framework. Comparisons were made for three technologies of regression analyses, including the conventional least squares regression method, the fuzzy linear regression method, and the newly derived fuzzy goal regression method. The case study, incorporating a complete database with 48 domestic wastewater treatment plants and 29 industrial wastewater treatment plants being collected in Taiwan, implements such a cost estimation procedure in an uncertain environment. Given that the fuzzy structure in regression estimation may account for the inherent human complexity in cost estimation, the fuzzy goal regression method does exhibit more robust results in terms of some criteria. Moderate economy of scale exists in constructing both the domestic and industrial wastewater treatment plants. Findings indicate that the optimal size of a domestic wastewater treatment plant is approximately equivalent to 15,000 m3/day (CMD) and higher in Taiwan

  1. Possibility of material cost reduction toward development of low-cost second-generation superconducting wires

    Science.gov (United States)

    Ichinose, Ataru; Horii, Shigeru; Doi, Toshiya

    2017-10-01

    Two approaches to reducing the material cost of second-generation superconducting wires are proposed in this paper: (1) instead of the electrical stabilizing layers of silver and copper presently used on the superconducting layer, a Nb-doped SrTiO3 conductive buffer layer and cube-textured Cu are proposed as an advanced architecture, and (2) the use of an electromagnetic (EM) steel tape as a metal substrate of coated conductors in a conventional architecture. In structures fabricated without using electrical stabilizing layers on the superconducting layer, the critical current density achieved at 77 K in a self-field was approximately 2.6 MA/cm2. On the other hand, in the case of using EM steel tapes, although the critical current density was far from practical at the current stage, the biaxial alignment of YBa2Cu3O y (YBCO) and buffer layers was realized without oxidation on the metal surface. In this study, the possibility of material cost reduction has been strongly indicated toward the development of low-cost second-generation superconducting wires in the near future.

  2. Cost reduction potentials in the German market for balancing power

    International Nuclear Information System (INIS)

    Flinkerbusch, Kai; Heuterkes, Michael

    2010-01-01

    This article examines potential cost reductions in the market for balancing power by pooling all four German control areas. In a united control area both the procurement and the production of balancing power may be more efficient than in four separated control areas. Our data contain bids on energy procurement as well as balancing power flows in the period from December 2007 to November 2008. A reference scenario simulates the market results for secondary and tertiary balancing power. Subsequently, we simulate a united control area. We show that in the period under review the total costs of balancing power are reduced by 17%. (author)

  3. A Review of Last Mile Logistics Innovations in an Externalities Cost Reduction Vision

    Directory of Open Access Journals (Sweden)

    Luigi Ranieri

    2018-03-01

    Full Text Available In this paper, a review of the recent scientific literature contributions on innovative strategies for last mile logistics, focusing on externalities cost reduction, is presented. Transport is causing problems in urban areas, in particular in freight transport: modern cities need solutions to reduce externalities costs such as congestion, pollution and others, which have increased in the last few years, especially due to the growth of goods delivery. Online sales and globalization lead to new trends in freight transport, and moreover, a larger quantity of goods is expected to be delivered in the next future. In this context, most of the delivered goods end up in the city centers. Last mile logistics is the least efficient stage of the supply chain and comprises up to 28% of the total delivery cost. Therefore, the improvement of last mile logistics and a significant externalities reduction are very important challenges for researchers. New technologies and transport means, innovative techniques and organizational strategies allow handling in a more effective way the last mile delivery in urban areas. Based on the Systematic Literature Review (SLR method, recent papers that significantly contributed, with original proposals, to the reduction of externalities in urban logistics are identified and analyzed in this work. Furthermore, a classification of the papers dealing with the externality reduction problem is presented. It is consistent with a general formulation proposed to evaluate external costs in urban area. The innovative contributions are classified into five main categories: innovative vehicles, proximity stations or points, collaborative and cooperative urban logistics, optimization of transport management and routing, innovations in public policies and infrastructures. The new paradigm of smart logistics is based on the combination of these concepts and on the proposed innovations.

  4. A probabilistic production costing analysis of SO2 emissions reduction strategies for Ohio: emissions, costs and employment tradeoffs

    International Nuclear Information System (INIS)

    Heslin, J.S.; Hobbs, B.F.

    1991-01-01

    A new approach for state- and utility-level analysis of the cost and regional economic impacts of strategies for reducing utility SO 2 emissions is summarized and applied to Ohio. The methodology is based upon probabilistic production costing and economic input-output analysis. It is an improvement over previous approaches because it: (1) accurately models random outages of generating units, 'must-run' constraints on unit output, and the distribution of power demands; and (2) runs quickly on a microcomputer and yet considers the entire range of potential control strategies from a systems perspective. The input-output analysis considers not only the economic effects of utility fuel use and capital investment, but also those of increased electric rates. Two distinct strategies are found to be most attractive for Ohio. The first, more flexible one, consists of emissions dispatching (ED) alone to meet short run emissions reduction targets. A 75 percent reduction can then be achieved by the turn of the century by combining ED and fuel switching (FS) with flue gas desulfurization, limestone injection multistage burners, and physical coal cleaning at selected plants. The second is a scrubber-based strategy which includes ED. By the year 2000, energy conservation becomes a cost effective component of these strategies. In order to minimize compliance costs, acid rain legislation which facilitates emission trading and places regional tonnage limits on emissions is desirable

  5. Cost-effectiveness analysis of risk reduction at nuclear power plants: What have we learned from experience

    International Nuclear Information System (INIS)

    Lochard, J.; Pages, P.

    1984-01-01

    Within the field of risk management techniques, cost-effectiveness analysis of risk reduction is now recognized as an adequate method for evaluating and defining the optimal allocation of protection and safety resources within large industrial systems. The paper considers some of the issues that arise in connection with cost-effectiveness analysis of risk reduction at nuclear power stations. Particular attention is called to both the interdependence between criteria that characterize risk reduction problems and the resulting aggregation and weighting procedures needed when the multidimensionality of criteria is explicitly taken into account. The discussion of these problems is illustrated with results of case studies on both public and occupational risk reduction at French PWRs during normal operation. (author)

  6. A reply to “Historical construction costs of global nuclear power reactors”

    International Nuclear Information System (INIS)

    Koomey, Jonathan; Hultman, Nathan E.; Grubler, Arnulf

    2017-01-01

    present data on the overnight costs of more than half of nuclear reactors built worldwide since the beginning of the nuclear age. The authors claim that this consolidated data set offers more accurate insights than previous country-level assessments. Unfortunately, the authors make analytical choices that mask nuclear power's real construction costs, cherry pick data, and include misleading data on early experimental and demonstration reactors. For those reasons, serious students of such issues should look elsewhere for guidance about understanding the true costs of nuclear power. - Highlights: • claim to accurately assess nuclear plant costs over time. • The authors err by relying on overnight costs, which exclude interest. • The authors cherry pick data (e.g, ignoring problems with French nuclear data). • The article's cherry picked data don’t even support the article's own conclusions. • Lovering et al. is not a reliable source for costs of nuclear power.

  7. Validation of generic cost estimates for construction-related activities at nuclear power plants: Final report

    International Nuclear Information System (INIS)

    Simion, G.; Sciacca, F.; Claiborne, E.; Watlington, B.; Riordan, B.; McLaughlin, M.

    1988-05-01

    This report represents a validation study of the cost methodologies and quantitative factors derived in Labor Productivity Adjustment Factors and Generic Methodology for Estimating the Labor Cost Associated with the Removal of Hardware, Materials, and Structures From Nuclear Power Plants. This cost methodology was developed to support NRC analysts in determining generic estimates of removal, installation, and total labor costs for construction-related activities at nuclear generating stations. In addition to the validation discussion, this report reviews the generic cost analysis methodology employed. It also discusses each of the individual cost factors used in estimating the costs of physical modifications at nuclear power plants. The generic estimating approach presented uses the /open quotes/greenfield/close quotes/ or new plant construction installation costs compiled in the Energy Economic Data Base (EEDB) as a baseline. These baseline costs are then adjusted to account for labor productivity, radiation fields, learning curve effects, and impacts on ancillary systems or components. For comparisons of estimated vs actual labor costs, approximately four dozen actual cost data points (as reported by 14 nuclear utilities) were obtained. Detailed background information was collected on each individual data point to give the best understanding possible so that the labor productivity factors, removal factors, etc., could judiciously be chosen. This study concludes that cost estimates that are typically within 40% of the actual values can be generated by prudently using the methodologies and cost factors investigated herein

  8. E-COCOMO: The Extended COst Constructive MOdel for Cleanroom Software Engineering

    Directory of Open Access Journals (Sweden)

    Hitesh KUMAR SHARMA

    2014-02-01

    Full Text Available Mistakes create rework. Rework takes time and increases costs. The traditional software engineering methodology defines the ratio of Design:Code:Test as 40:20:40. As we can easily see that 40% time and efforts are used in testing phase in traditional approach, that means we have to perform rework again if we found some bugs in testing phase. This rework is being performed after Design and code phase. This rework will increase the cost exponentially. The cleanroom software engineering methodology controls the exponential growth in cost by removing this rework. It says that "do the work correct in first attempt and move to next phase after getting the proof of correctness". This new approach minimized the rework and reduces the cost in the exponential ratio. Due to the removal of testing phase, the COCOMO (COst COnstructive MOdel used for the traditional engineering is not directly applicable in cleanroom software engineering. The traditional cost drivers used for traditional COCOMO needs to be revised. We have proposed the Extended version of COCOMO (i.e. E-COCOMO in which we have incorporated some new cost drivers. This paper explains the proposed E-COCOMO and the detailed description of proposed new cost driver.

  9. Risk management study for the Hanford Site facilities: Risk reduction cost comparison for the retired Hanford Site facilities. Volume 4

    Energy Technology Data Exchange (ETDEWEB)

    Coles, G.A.; Egge, R.G.; Senger, E.; Shultz, M.W.; Taylor, W.E.

    1994-02-01

    This document provides a cost-comparison evaluation for implementing certain risk-reduction measures and their effect on the overall risk of the 100 and 200 Area retired, surplus facilities. The evaluation is based on conditions that existed at the time the risk evaluation team performed facility investigations, and does not acknowledge risk-reduction measures that occurred soon after risk identification. This evaluation is one part of an overall risk management study for these facilities. The retired facilities investigated for this evaluation are located in the 100 and 200 Areas of the 1450-km{sup 2} Hanford Site. The Hanford Site is a semiarid tract of land in southeastern Washington State. The nearest population center is Richland, Washington, (population 32,000) 30 km southeast of the 200 Area. This cost-comparison evaluation (1) determines relative costs for reducing risk to acceptable levels; (2) compares the cost of reducing risk using different risk-reduction options; and (3) compares the cost of reducing risks at different facilities. The result is an identification of the cost effective risk-reduction measures. Supporting information required to develop costs of the various risk-reduction options also is included.

  10. Construction cost estimation of spherical storage tanks: artificial neural networks and hybrid regression—GA algorithms

    Science.gov (United States)

    Arabzadeh, Vida; Niaki, S. T. A.; Arabzadeh, Vahid

    2017-10-01

    One of the most important processes in the early stages of construction projects is to estimate the cost involved. This process involves a wide range of uncertainties, which make it a challenging task. Because of unknown issues, using the experience of the experts or looking for similar cases are the conventional methods to deal with cost estimation. The current study presents data-driven methods for cost estimation based on the application of artificial neural network (ANN) and regression models. The learning algorithms of the ANN are the Levenberg-Marquardt and the Bayesian regulated. Moreover, regression models are hybridized with a genetic algorithm to obtain better estimates of the coefficients. The methods are applied in a real case, where the input parameters of the models are assigned based on the key issues involved in a spherical tank construction. The results reveal that while a high correlation between the estimated cost and the real cost exists; both ANNs could perform better than the hybridized regression models. In addition, the ANN with the Levenberg-Marquardt learning algorithm (LMNN) obtains a better estimation than the ANN with the Bayesian-regulated learning algorithm (BRNN). The correlation between real data and estimated values is over 90%, while the mean square error is achieved around 0.4. The proposed LMNN model can be effective to reduce uncertainty and complexity in the early stages of the construction project.

  11. Cost effectiveness of a screen-and-treat program for asymptomatic vaginal infections in pregnancy: towards a significant reduction in the costs of prematurity.

    Science.gov (United States)

    Kiss, H; Pichler, Eva; Petricevic, L; Husslein, P

    2006-08-01

    The purpose of this investigation was to determine the cost-saving potential of a simple screen-and-treat program for vaginal infection, which has previously been shown to lead to a reduction of 50% in the rate of preterm births. To determine the potential cost savings, we compared the direct costs of preterm delivery of infants with a birth weight below 1900g with the costs of the screen-and-treat program. We used a cut-off birth weight of 1900g because, in our population, all infants with a birth weight below 1900g were transferred to the neonatal intensive care unit. The direct costs associated with preterm delivery were defined to include the costs of the initial hospitalization of both mother and infant and the costs of outpatient follow-up throughout the first 6 years of life of the former preterm infant. The costs of the screen-and-treat program were defined to include the costs of the screening examination and the resulting costs of antimicrobial treatment and follow-up. All calculations were based on health-economic data obtained in the metropolitan area of Vienna, Austria. The number of preterm infants with a birth weight below 1900g was 12 (0.5%) in the intervention group (N=2058) and 29 (1.3%) in the control group (N=2097). The direct costs per preterm birth were found to amount to EUR (euro) 60262. Overall, the expected total savings in direct costs achieved by the screen-and-treat program and the ensuing 50% reduction in the number preterm births with a birth weight below 1900g amounted to more than euro 11 million. The costs of screening and treatment were found to amount to merely 7% of the direct costs saved as a result of the screen-and-treat program. A simple preterm prevention program, consisting of screening and antimicrobial treatment and follow-up of women with asymptomatic vaginal infection, leads not only to a significant reduction in the rate of preterm births but also to substantial savings in the direct costs associated with prematurity.

  12. 48 CFR 52.215-10 - Price Reduction for Defective Certified Cost or Pricing Data.

    Science.gov (United States)

    2010-10-01

    ... Defective Certified Cost or Pricing Data. 52.215-10 Section 52.215-10 Federal Acquisition Regulations System... Text of Provisions and Clauses 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data... or Pricing Data (OCT 2010) (a) If any price, including profit or fee, negotiated in connection with...

  13. The Impact of Accounting Methods on Cost Reduction Rates in Defense Aerospace Weapons System Programs

    Science.gov (United States)

    1988-12-01

    and adhered to in U.S. industry, allow some flexibility in accounting. Under GAAP , accounting areas such as depreciation , inventory, investment tax... depreciation , inventory and investment tax credit) in predicting cost reduction rates are studied. Of the three accounting variables, only inventory...RATES .. ................. ........... 5 1. Depreciation ........ ............... 6 2. Capitalizing or Expensing of Costs . . .. 6 3. Material Costs

  14. 2007 Effect of Changes in Layout Shape on Unit Construction Cost

    African Journals Online (AJOL)

    ezra

    The shape of a building layout is the spatial attribute that defines the outline of the building. ... The results of this study indicate that perimeter-to-floor ratio, unit construction ... Design variables have been defined as the .... The objective of this paper is to explore the effect ... preparation of cost estimate, changing of design.

  15. Constructing carbon offsets: The obstacles to quantifying emission reductions

    International Nuclear Information System (INIS)

    Millard-Ball, Adam; Ortolano, Leonard

    2010-01-01

    The existing literature generally ascribes the virtual absence of the transport sector from the Clean Development Mechanism (CDM) to the inherent complexity of quantifying emission reductions from mobile sources. We use archival analysis and interviews with CDM decision-makers and experts to identify two additional groups of explanations. First, we show the significance of aspects of the CDM's historical evolution, such as the order in which methodologies were considered and the assignment of expert desk reviewers. Second, we highlight inconsistencies in the treatment of uncertainty across sectors. In contrast to transport methodologies, other sectors are characterized by a narrow focus on sources of measurement uncertainty and a neglect of economic effects ('market leakages'). We do not argue that the rejection of transport methodologies was unjustified, but rather than many of the same problems are inherent in other sectors. Thus, the case of transport sheds light on fundamental problems in quantifying emission reductions under the CDM. We argue that a key theoretical attraction of the CDM-equalization of marginal abatement costs across all sectors-has been difficult to achieve in practice.

  16. A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste

    International Nuclear Information System (INIS)

    Yuan Hongping; Chini, Abdol R.; Lu Yujie; Shen Liyin

    2012-01-01

    Highlights: ► We proposes a model for projecting C and D waste reduction of construction projects. ► The model can simulate effects of various management strategies on waste reduction. ► The model integrates all essential variables that affect C and D waste reduction. ► By using the model, best strategies could be identified before being implemented. - Abstract: During the past few decades, construction and demolition (C and D) waste has received increasing attention from construction practitioners and researchers worldwide. A plethora of research regarding C and D waste management has been published in various academic journals. However, it has been determined that existing studies with respect to C and D waste reduction are mainly carried out from a static perspective, without considering the dynamic and interdependent nature of the whole waste reduction system. This might lead to misunderstanding about the actual effect of implementing any waste reduction strategies. Therefore, this research proposes a model that can serve as a decision support tool for projecting C and D waste reduction in line with the waste management situation of a given construction project, and more importantly, as a platform for simulating effects of various management strategies on C and D waste reduction. The research is conducted using system dynamics methodology, which is a systematic approach that deals with the complexity – interrelationships and dynamics – of any social, economic and managerial system. The dynamic model integrates major variables that affect C and D waste reduction. In this paper, seven causal loop diagrams that can deepen understanding about the feedback relationships underlying C and D waste reduction system are firstly presented. Then a stock-flow diagram is formulated by using software for system dynamics modeling. Finally, a case study is used to illustrate the validation and application of the proposed model. Results of the case study not only

  17. A COST-REDUCTION OF SELF-COMPACTING CONCRETE INCORPORATING RAW RICE HUSK ASH

    Directory of Open Access Journals (Sweden)

    H. AWANG

    2016-01-01

    Full Text Available The higher material cost of self-compacting concrete (SCC as compared to normal vibrated concrete is mainly due to its higher cement content. In order to produce economical SCC, a significant amount of cement should be replaced with cheaper material options, which are commonly found in byproduct materials such as limestone powder (LP, fly ash (FA and raw rice husk ash (RRHA. However, the use of these byproduct materials to replace the high volumes of cement in an SCC mixture will produce deleterious effects such as strength reduction. Thus, the objective of this paper is to investigate the optimum SCC mixture proportioning capable of minimizing SCC’s material cost. A total of fifteen mixes were prepared. This study showed that raw rice husk ash exhibited positive correlations with fly ash and fine limestone powder and were able to produce high compressive and comparable to normal concrete. The SCC-mix made with quaternary cement-blend comprising OPC/LP/FA/RRHA at 55/15/15/15 weight percentage ratio is found to be capable of maximizing SCC’s material-cost reduction to almost 19% as compared with the control mix

  18. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models

  19. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Final report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. Mockups applied to design review of AP600/1000, Construction planning for AP 600, and AP 1000 maintenance evaluation. Proof of concept study also performed for GenIV PBMR models.

  20. Construction cost prediction model for conventional and sustainable college buildings in North America

    Directory of Open Access Journals (Sweden)

    Othman Subhi Alshamrani

    2017-03-01

    Full Text Available The literature lacks in initial cost prediction models for college buildings, especially comparing costs of sustainable and conventional buildings. A multi-regression model was developed for conceptual initial cost estimation of conventional and sustainable college buildings in North America. RS Means was used to estimate the national average of construction costs for 2014, which was subsequently utilized to develop the model. The model could predict the initial cost per square feet with two structure types made of steel and concrete. The other predictor variables were building area, number of floors and floor height. The model was developed in three major stages, such as preliminary diagnostics on data quality, model development and validation. The developed model was successfully tested and validated with real-time data.

  1. Development of econometric models for cost and time over-runs: an empirical study of major road construction projects in pakistan

    International Nuclear Information System (INIS)

    Khan, A.; Chaudhary, M.A.

    2016-01-01

    The construction industry is flourishing worldwide and contributes about 10% to the GDP of the world i.e. up to the tune of 4.6 Trillion US dollars. It employs almost 7% of the total employee dpersons and, consumes around 40% of the total energy. The Pakistani construction sector has displayed impressive growth in recent past years. The efficient road network is a key part of construction business and plays a significant role in the economic uplift of country. The overruns in costs and delays in completion of projects are very common phenomena and it has also been observed that the projects involving construction of roads also face problems of delays and cost over runs especially in developing countries. The causes of cost overruns and delays in road projects being undertaken by the premier road construction organization of Pakistan National Highway Authority (NHA) have been considered in this study. It has been done specifically in the context of impact of cause(s) determined from project report of a total of one hundred and thirty one (131) projects. The ten causative factors which we recognize as Design, Planning and Scheduling Related problems, Financial Constraint Related reasons, Social Problem Related reasons, Technical Reasons, Administrative Reasons, Scope Increase, Specification Changes, Cost Escalation Related reasons, Non-Availability of Equipment or Material and Force Majeure play a commanding role in determination of the cost and time over runs. It has also been observed that among these identified causes, the factors of Administrative Reason, Design, Planning and Scheduling Related, Technical Reasons and Force Majeure are the most significant reasons in cost and time overruns. Whereas, the Cost Escalation related reasons has the least impact on cost increase and delays. The NHA possesses a financial worth of around Rs. 36 billion and with an annual turn over amounting to Rs. 22 billion is responsible to perform road construction project in entire

  2. Supplier’s Joint Investments in Cost Reduction and Quality Improvement in a Decentralized Supply Chain

    Directory of Open Access Journals (Sweden)

    Hengyun Zhang

    2017-01-01

    Full Text Available We consider a decentralized supply chain with a downstream manufacturer and an upstream supplier. The upstream supplier sells a product to the manufacturer, who faces a quality and price sensitive demand. The supplier has a chance to invest in both cost reduction and quality improvement of its product. We derive the optimal investment and pricing decisions for the supply chain members. We do so in both the centralized and the decentralized supply chains. We show that the optimal investment and pricing decisions in the decentralized supply chain may deviate from that in the centralized supply chain. We develop a mechanism to coordinate the decentralized supply chain. The developed mechanism contains four policies: wholesale price, sharing of revenue, sharing of cost reduction investment cost, and sharing of quality improvement investment cost. We also show that the developed coordination mechanism can lead to Pareto improvement.

  3. Comparative evaluation of low cost materials as constructed wetland filling media

    Science.gov (United States)

    Pinho, Henrique J. O.; Vaz, Mafalda M.; Mateus, Dina M. R.

    2017-11-01

    Three waste materials from civil construction activities were assessed as low cost alternative filling materials used in Constructed Wetlands (CW). CW are green processes for wastewater treatment, whose design includes an appropriate selection of vegetation and filling material. The sustainability of such processes may be incremented using recovered wastes as filling materials. The abilities of the materials to support plant growth and to contribute to pollutants removal from wastewater were assessed and compared to expanded clay, a filling usually used in CW design. Statistical analysis, using one-way ANOVA and Welch's ANOVA, demonstrate that limestone fragments are a better choice of filling material than brick fragments and basalt gravel.

  4. Specification, construction, and exact reduction of state transition system models of biochemical processes.

    Science.gov (United States)

    Bugenhagen, Scott M; Beard, Daniel A

    2012-10-21

    Biochemical reaction systems may be viewed as discrete event processes characterized by a number of states and state transitions. These systems may be modeled as state transition systems with transitions representing individual reaction events. Since they often involve a large number of interactions, it can be difficult to construct such a model for a system, and since the resulting state-level model can involve a huge number of states, model analysis can be difficult or impossible. Here, we describe methods for the high-level specification of a system using hypergraphs, for the automated generation of a state-level model from a high-level model, and for the exact reduction of a state-level model using information from the high-level model. Exact reduction is achieved through the automated application to the high-level model of the symmetry reduction technique and reduction by decomposition by independent subsystems, allowing potentially significant reductions without the need to generate a full model. The application of the method to biochemical reaction systems is illustrated by models describing a hypothetical ion-channel at several levels of complexity. The method allows for the reduction of the otherwise intractable example models to a manageable size.

  5. Perceptions of managers regarding supply chain cost reduction in the South African mobile phone industry

    Directory of Open Access Journals (Sweden)

    Musenga F. Mpwanya

    2015-06-01

    Full Text Available Background: Many industries, including the mobile phone industry, experience a surge in supply chain (SC costs in the provision of products and services to their customers. Despite this, only a few studies have been conducted on SC cost reduction in South Africa and globally. Objective: This study seeks to understand the perceptions of managers regarding cost reduction in the South African mobile phone SC. Method: A qualitative case study was conducted, involving eight willing managers and using semi-structured interviews, observation and documents. Interviews transcripts were analysed thematically with the help of Atlas.ti and a threefold process was followed, comprising data reduction, data display and data interpretation and conclusion drawing. Results: The findings suggest that mobile phone companies should consolidate their strategic relationships and be efficient, in order to effectively reduce costs in the South African mobile phone SC. To achieve this, whilst South African mobile network operators have to share more and more infrastructure and outsource their operations, other mobile phone companies should re-engineer their operational processes and their reduce costs across the SC. Conclusion: The knowledge generated from this study should assist South African mobile phone companies to reduce their SC costs and address high-priced mobile services. On the other hand, this study should assist regulating authorities (the Department of Communications and the Independent Communication Authority of South Africa to gain insights into the challenges faced by the mobile phone industry in South Africa and, therefore, to make appropriate and adequate mobile telecommunication policies.

  6. Applying Interpretive Structural Modeling to Cost Overruns in Construction Projects in the Sultanate of Oman

    Directory of Open Access Journals (Sweden)

    K. Alzebdeh

    2015-06-01

    Full Text Available Cost overruns in construction projects are a problem faced by project managers, engineers, and clients throughout the Middle East.  Globally, several studies in the literature have focused on identifying the causes of these overruns and used statistical methods to rank them according to their impacts. None of these studies have considered the interactions among these factors. This paper examines interpretive structural modelling (ISM as a viable technique for modelling complex interactions among factors responsible for cost overruns in construction projects in the Sultanate of Oman. In particular, thirteen interrelated factors associated with cost overruns were identified, along with their contextual interrelationships. Application of ISM leads to organizing these factors in a hierarchical structure which effectively demonstrates their interactions in a simple way. Four factors were found to be at the root of cost overruns: instability of the US dollar, changes in governmental regulations, faulty cost estimation, and poor coordination among projects’ parties. Taking appropriate actions to minimize the influence of these factors can ultimately lead to better control of future project costs. Thisstudy is of value to managers and decision makers because it provides a powerful yet very easy to apply approach for investigating the problem of cost overruns and other similar issues.

  7. A sensitivity analysis of timing and costs of greenhouse gas emission reductions

    NARCIS (Netherlands)

    Gerlagh, R.; van der Zwaan, B.C.C.

    2004-01-01

    This paper analyses the optimal timing and macro-economic costs of carbon emission reductions that mitigate the global average atmospheric temperature increase. We use a macro-economic model in which there are two competing energy sources, fossil-fuelled and non-fossil-fuelled. Technological change

  8. Cost-Sharing of Ecological Construction Based on Trapezoidal Intuitionistic Fuzzy Cooperative Games

    Directory of Open Access Journals (Sweden)

    Jiacai Liu

    2016-11-01

    Full Text Available There exist some fuzziness and uncertainty in the process of ecological construction. The aim of this paper is to develop a direct and an effective simplified method for obtaining the cost-sharing scheme when some interested parties form a cooperative coalition to improve the ecological environment of Min River together. Firstly, we propose the solution concept of the least square prenucleolus of cooperative games with coalition values expressed by trapezoidal intuitionistic fuzzy numbers. Then, based on the square of the distance in the numerical value between two trapezoidal intuitionistic fuzzy numbers, we establish a corresponding quadratic programming model to obtain the least square prenucleolus, which can effectively avoid the information distortion and uncertainty enlargement brought about by the subtraction of trapezoidal intuitionistic fuzzy numbers. Finally, we give a numerical example about the cost-sharing of ecological construction in Fujian Province in China to show the validity, applicability, and advantages of the proposed model and method.

  9. Cost-Sharing of Ecological Construction Based on Trapezoidal Intuitionistic Fuzzy Cooperative Games.

    Science.gov (United States)

    Liu, Jiacai; Zhao, Wenjian

    2016-11-08

    There exist some fuzziness and uncertainty in the process of ecological construction. The aim of this paper is to develop a direct and an effective simplified method for obtaining the cost-sharing scheme when some interested parties form a cooperative coalition to improve the ecological environment of Min River together. Firstly, we propose the solution concept of the least square prenucleolus of cooperative games with coalition values expressed by trapezoidal intuitionistic fuzzy numbers. Then, based on the square of the distance in the numerical value between two trapezoidal intuitionistic fuzzy numbers, we establish a corresponding quadratic programming model to obtain the least square prenucleolus, which can effectively avoid the information distortion and uncertainty enlargement brought about by the subtraction of trapezoidal intuitionistic fuzzy numbers. Finally, we give a numerical example about the cost-sharing of ecological construction in Fujian Province in China to show the validity, applicability, and advantages of the proposed model and method.

  10. An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)

    Science.gov (United States)

    2013-03-01

    construction firms ( Molenaar et al. 1999). The design-build+ method is a form of DB which brings the contractor into the planning phase early to help...of firm fixed prices requires the contractor to commit to a set price early in the design process ( Molenaar et al. 1999). Both firm fixed and cost...Research The performance of MILCON projects based on execution method has been investigated in terms of cost, performance, and schedule. Molenaar

  11. Final cost reduction study for the Geysers Recharge Alternative. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-11-01

    The purpose of this study is to determine whether or not cost reduction opportunities exist for the Geysers Recharge Alternative as defined in the Santa Rosa Subregional Long-Term Wastewater Project EIR/EIS. The City of Santa Rosa has been directed to have a plan for reclaimed water disposal in place by 1999 which will meet future capacity needs under all weather conditions. A Draft EIR/EIS released in July 1996 and a Final EIR certified in June 1997 examine four primary alternatives plus the No Action Alternative. Two of the primary alternatives involve agricultural irrigation with reclaimed water, either in western or southern Sonoma County. Another involves increased discharge of reclaimed water into the Russian River. The fourth involves using reclaimed water to replenish the geothermal reservoir at the Geysers. The addition of this water source would enable the Geysers operators to produce more steam from the geothermal area and thereby prolong the life and economic production level of the steamfield and the geothermal power plants supplied by the steamfield. This study provides additional refined cost estimates for new scenarios which utilize an alternative pipeline alignment and a range of reclaimed water flows, which deliver less water to the Geysers than proposed in the EIR/EIS (by distributing flow to other project components). Also, electrical power rates were revised to reflect the recent changes in costs associated with deregulation of the power industry. In addition, this report provides information on sources of potential public and private funding available and future environmental documentation required if the cost reduction scenarios were to be selected by the City as part of their preferred alternative.

  12. Simulating greenhouse gas (GHG) allowance cost and GHG emission reduction in Western Europe

    International Nuclear Information System (INIS)

    Delarue, Erik; Lamberts, Hans; D'haeseleer, William

    2007-01-01

    Due to the growing concern for global warming, the EU25 have implemented the European Union Greenhouse Gas Emission Trading Scheme (EU ETS). In the first trading period (2005-2007), part of the targeted GHG emission reductions presumably will have to result from a switch from coal fired electricity generation to gas fired electricity generation. It is possible to calculate the allowance cost necessary to switch a certain coal fired plant with a certain gas fired plant in the merit order. The allowance cost obtained is a so called switching point. When comparing historic European Union Allowance (EUA) prices (2005) with the corresponding historic switching points, the EUA prices were found high enough to cause a certain switch in the summer season. This finding leads to the use of switching points in establishing allowance cost profiles for several scenarios. A variable gas price profile is used in the simulation tool E-Simulate to simulate electricity generation and related GHG emissions in an eight zonal model representing Western Europe. Several GHG allowance cost profile scenarios are examined. For each scenario, electricity generation in the considered countries is clarified. The focus however lies on the GHG emission reduction potentials. These potentials are addressed for each scenario

  13. Costs of certified emission reductions under the Clean Development Mechanism of the Kyoto Protocol

    International Nuclear Information System (INIS)

    Rahman, Shaikh M.; Kirkman, Grant A.

    2015-01-01

    This paper examines the cost structure of certified emission reductions (CERs) through various types of projects under the Clean Development Mechanism (CDM) of the Kyoto Protocol. Using the CDM project data, the costs of CERs and their variation across technology and over time and space are estimated by applying alternative functional forms and specifications. Results show that the average cost of CERs decreases with the project scale and duration, scale and duration effects significantly vary across project types, and there is an upward trend in costs. The results also show that the distribution of the projects in the CDM portfolio or a given location does not strictly follow the relative cost structure, nor does the distribution of the CDM projects in different host countries follow the principle of comparative advantage. More than 84% of the CDM portfolio consists of various energy projects with substantially higher costs of CERs than afforestation and reforestation, industrial and landfill gas reduction, and methane avoidance projects, which are only 12% of all projects. While per unit cost of abatement plays an important role in the bottom-up and top-down models to evaluate emission reduction potential and analyze policy alternatives, the findings contradict the presumption of such models that project investors seek out low-cost opportunities. At the aggregate level, the cost of CER by the projects in Asia and Europe is similar but higher than those hosted in Africa, Americas, and Oceania. Yet more than 83% of the projects in the CDM portfolio are located in Asia; more than 69% of the projects are in China and India alone. China appears to have a comparative advantage (i.e., lowest opportunity cost) in energy efficiency projects, while India has a comparative advantage in hydro power projects and Brazil has a comparative advantage in wind power projects. In contrast, energy efficiency category accounts for only 8% of the CDM projects in China, hydro power

  14. Case study of the effects of public safety regulation on the construction costs of coal-fired and nuclear power plants

    International Nuclear Information System (INIS)

    Morris, C.D.

    1987-01-01

    Regulations intended to reduce the number of accidents at nuclear plants and the discharge of sulfur and particulate wastes at coal-fired power plants have become an important cause of construction cost escalation. Measuring the costs of these regulatory interventions is a difficult research task. The three-unit Bruce Mansfield coal-fired plant and the two-unit Beaver Valley nuclear power station located in Shippingport, Pennsylvania, provide a unique opportunity for a case study of the costs of regulation in the construction of both kinds of plants. The units of each plant were built sequentially over a period of intensifying regulation. The method used to measure the costs of public safety regulation in the construction of each kind of plant is to determine the connections between the issuances of the regulatory agencies (EPA and NRC) and cost escalations of succeeding units. The small cost escalations of the Mansfield 3 unit, in comparison to the massive costs of the Beaver Valley 2 unit, suggest that the design and construction of new coal-fired plants are not disrupted by regulatory interventions nearly as extensively as are nuclear units. Certain technical features of Beaver Valley 2, especially its small size and a design that is identical to the first unit's, further contribute to its cost escalations

  15. COMPARISON OF WEST GERMAN AND U.S. FLUE GAS DESULFURIZATION AND SELECTIVE CATALYTIC REDUCTION COSTS

    Science.gov (United States)

    The report documents a comparison of the actual cost retrofitting flue gas desulfurization (FGD) and selective catalytic reduction (SCR) on Federal Republic of German (FRG) boilers to cost estimating procedures used in the U.S. to estimate the retrofit of these controls on U.S. b...

  16. Cost-Effectiveness of Emission Reduction for the Indonesian Coal-Fired Power Plants

    NARCIS (Netherlands)

    Handayani, Kamia; Krozer, Yoram

    2014-01-01

    This paper presents the result of research on the cost-effectiveness of emission reduction in the selected coal-fired power plants (CFPPs) in Indonesia. The background of this research is the trend of more stringent environmental regulation regarding air emission from coal-fired power plants (CFPPs)

  17. Elimination of maintenance outage and cost reduction by development of outage-free maintenance techniques

    International Nuclear Information System (INIS)

    Jakabe, Hideo; Maruyama, Yoshinaga

    1996-01-01

    The development program of KEPCO on outage-free maintenance techniques for distribution line work since 1984 is overviewed. It has succeeded in eliminating maintenance outages since 1989. The original aim was to improve customer satisfaction. However, in all, four benefits were realised through the development. These are cost reduction, securing of worker safety, improvement of customer service, and advancement of distribution techniques and morale in KEPCO. The introduction of robotic techniques for maintenance work and manipulator techniques for repair work is planned for further modernization. These new techniques are helping in both work safety and work efficiency improvement. Cost reduction and advancement of distribution line work techniques is also considered. (R.P.)

  18. Quantifying costs and benefits of integrated environmental strategies of air quality management and greenhouse gas reduction in the Seoul Metropolitan Area

    Energy Technology Data Exchange (ETDEWEB)

    Chae, Yeora, E-mail: yrchae@kei.re.kr [Korea Environment Institute, 290 Jinheungno, Eunpyeong-Gu, Seoul 122-706 (Korea, Republic of); Park, Jeongim [Department of Environmental Health Science, Soonchunhyang University, Asan, Chungnam 336-745 (Korea, Republic of)

    2011-09-15

    This study quantifies the costs and benefits of Integrated Environmental Strategies (IES) of reducing air pollutants and greenhouse gas (GHG) emissions at a minimal cost in the Seoul Metropolitan Area (SMPA) for the year 2014 and compares with current air quality management plans and greenhouse gas (GHG) mitigation plans. The results estimated health benefits from prevention of premature mortality under the IES scenario as 14 trillion Korean won (won) and associated cost as -3.6 trillion won, yielding total benefit, difference of benefits and costs, of 18 trillion won. With the inclusion of benefits from GHG reductions, the total benefits result in 147 trillion won. The difference of human health benefits and costs of air quality management plan and GHG reduction strategies result in 14 trillion won and 8 trillion won, respectively. The research shows that benefits of integrating air quality management and GHG reduction measures are greater than those obtained by air quality management and GHG reduction measures individually. - Highlights: > The costs and benefits of Integrated Environmental Strategies (IES) are quantified.> Benefit under IES is 14 trillion Korean won and cost is -3.6 trillion won.> Benefit of air quality management is 14 trillion won and cost is -0.3 trillion won.> Benefit under GHG reduction is 1.5 trillion won and cost is -6.4 trillion won.> Benefits of IES are greater than those obtained by each measure individually.

  19. Cost-Effectiveness of Emissions Reduction through Vehicle Repair Compared to CNG Conversion.

    Science.gov (United States)

    Guenther, Paul L; Lesko, Jon M; Stedman, Donald H

    1996-10-01

    In return for a temporary waiver from converting five vehicles to operate on compressed natural gas (CNG) for the Denver Clean Fuels program, the University of Denver identified, tested, repaired, and retested nine employee commuter vehicles. The results of the study validated the concept that employer-based identification and repair programs can be carried out in a cost-effective way. On average, each repaired vehicle removed fifty times more carbon monoxide (CO) emissions from Denver air than each CNG conversion. The average cost of each repair was eight times less than the average cost of each conversion. The average fuel economy benefit from the repairs was enough to pay for the average cost of repairs in less than three years of normal driving. When the expected lifetimes of repairs and conversions are included, the targeted repair program appears to be over sixty times more cost-effective as a CO emissions reduction strategy than CNG conversion.

  20. Management for Construction Materials and Control of Construction Waste in Construction Industry: A Review

    OpenAIRE

    A. A. Gulghane; Prof P. V. Khandve

    2015-01-01

    In recent treads a wide range of building materials is available for the construction of civil engineering structures. The total cost of materials may be up to 60% or more of the total cost incurred in construction project dependent upon the type of project. Effective construction materials management is a key to success for a construction project. Construction waste is another serious problem in construction industry. A large and various types of construction waste with different...

  1. Chapter 17. Engineering cost analysis

    Energy Technology Data Exchange (ETDEWEB)

    Higbee, Charles V.

    1998-01-01

    In the early 1970s, life cycle costing (LCC) was adopted by the federal government. LCC is a method of evaluating all the costs associated with acquisition, construction and operation of a project. LCC was designed to minimize costs of major projects, not only in consideration of acquisition and construction, but especially to emphasize the reduction of operation and maintenance costs during the project life. Authors of engineering economics texts have been very reluctant and painfully slow to explain and deal with LCC. Many authors devote less than one page to the subject. The reason for this is that LCC has several major drawbacks. The first of these is that costs over the life of the project must be estimated based on some forecast, and forecasts have proven to be highly variable and frequently inaccurate. The second problem with LCC is that some life span must be selected over which to evaluate the project, and many projects, especially renewable energy projects, are expected to have an unlimited life (they are expected to live for ever). The longer the life cycle, the more inaccurate annual costs become because of the inability to forecast accurately.

  2. Making Hay When It Rains: The Effect Prevailing Wage Regulations, Scale Economies, Seasonal, Cyclical and Local Business Patterns Have On School Construction Costs.

    Science.gov (United States)

    Azari-Rad, Hamid; Philips, Peter; Prus, Mark

    2002-01-01

    Examines several alternative ways for school districts to reduce the construction costs of new facilities. Finds that spacing out the start of facility construction projects and building during economic downturns in the construction industry offer the best options for construction cost savings. (PKP)

  3. Methodology for reducing energy and resource costs in construction of trenchless crossover of pipelines

    Science.gov (United States)

    Toropov, V. S.

    2018-05-01

    The paper suggests a set of measures to select the equipment and its components in order to reduce energy costs in the process of pulling the pipeline into the well in the constructing the trenchless pipeline crossings of various materials using horizontal directional drilling technology. A methodology for reducing energy costs has been developed by regulating the operation modes of equipment during the process of pulling the working pipeline into a drilled and pre-expanded well. Since the power of the drilling rig is the most important criterion in the selection of equipment for the construction of a trenchless crossover, an algorithm is proposed for calculating the required capacity of the rig when operating in different modes in the process of pulling the pipeline into the well.

  4. Labor productivity adjustment factors. A method for estimating labor construction costs associated with physical modifications to nuclear power plants

    International Nuclear Information System (INIS)

    Riordan, B.J.

    1986-03-01

    This report develops quantitative labor productivity adjustment factors for the performance of regulatory impact analyses (RIAs). These factors will allow analysts to modify ''new construction'' labor costs to account for changes in labor productivity due to differing work environments at operating reactors and at reactors with construction in progress. The technique developed in this paper relies on the Energy Economic Data Base (EEDB) for baseline estimates of the direct labor hours and/or labor costs required to perform specific tasks in a new construction environment. The labor productivity cost factors adjust for constraining conditions such as working in a radiation environment, poor access, congestion and interference, etc., which typically occur on construction tasks at operating reactors and can occur under certain circumstances at reactors under construction. While the results do not portray all aspects of labor productivity, they encompass the major work place conditions generally discernible by the NRC analysts and assign values that appear to be reasonable within the context of industry experience. 18 refs

  5. Modularization in the construction industry using a top-down approach

    DEFF Research Database (Denmark)

    Kudsk, Anders; Hvam, Lars; Thuesen, Christian

    2013-01-01

    Throughout the last centuries, the manufacturing industry has experienced great improvements in efficiency and cost reductions, but the same improvements have not taken place in the construction industry. Based on the principles of mass customization that are known from the manufacturing industry...

  6. Modularization Technology in Power Plant Construction

    International Nuclear Information System (INIS)

    Kenji Akagi; Kouichi Murayama; Miki Yoshida; Junichi Kawahata

    2002-01-01

    Since the early 1980's, Hitachi has been developing and applying modularization technology to domestic nuclear power plant construction, and has achieved great rationalization. Modularization is one of the plant construction techniques which enables us to reduce site labor by pre-assembling components like equipment, pipes, valves and platforms in congested areas and installing them using large capacity cranes for cost reduction, better quality, safety improvement and shortening of construction time. In this paper, Hitachi's modularization technologies are described especially from with respect to their sophisticated design capabilities. The application of 3D-CAD at the detailed layout design stage, concurrent design environment achieved by the computer network, module design quantity control and the management system are described. (authors)

  7. Report Tunneling Cost Reduction Study prepared for Fermilab

    International Nuclear Information System (INIS)

    Not Available

    1999-01-01

    Fermi National Accelerator Laboratories has a need to review the costs of constructing the very long tunnels which would be required for housing the equipment for the proposed Very Large Hadron Collider (VLHC) project. Current tunneling costs are high, and the identification of potential means of significantly reducing them, and thereby helping to keep overall project costs within an acceptable budget, has assumed great importance. Fermilab has contracted with The Robbins Company to provide an up-to-date appraisal of tunneling technology, and to review the potential for substantially improving currently the state-of-practice performance and construction costs in particular. The Robbins Company was chosen for this task because of its long and successful experience in hard rock mechanical tunnel boring. In the past 40 years, Robbins has manufactured over 250 tunneling machines, the vast majority for hard rock applications. In addition to also supplying back-up equipment, Robbins has recently established a division dedicated to the manufacture of continuous conveying equipment for the efficient support of tunneling operations. The study extends beyond the tunnel boring machine (TBM) itself, and into the critical area of the logistics of the support of the machine as it advances, including manpower. It is restricted to proven methods using conventional technology, and its potential for incremental but meaningful improvement, rather than examining exotic and undeveloped means of rock excavation that have been proposed from time to time by the technical community. This is the first phase of what is expected to be a number of studies in increasing depth of technical detail, and as such has been restricted to the issues connected with the initial 34 kilometer circumference booster tunnel, and not the proposed 500 kilometer circumference tunnel housing the VLHC itself. The booster tunnel is entirely sited within low to medium strength limestone and dolomite formations

  8. Soft-copy sonography: cost reduction sensitivity analysis in a pediatric hospital.

    Science.gov (United States)

    Don, S; Albertina, M J; Ammann, D

    1998-03-01

    Our objective was to determine whether interpreting sonograms of pediatric patients using soft-copy (computer workstation) instead of laser-printed film could reduce costs for a pediatric radiology department. We used theoretic models of growth to analyze costs. The costs of a sonographic picture archiving and communication system (three interface devices, two workstations, a network server, maintenance expenses, and storage media costs) were compared with the potential savings of eliminating film and increasing technologist efficiency or reducing the number of technologists. The model was based on historic trends and future capitation estimates that will reduce fee-for-service reimbursement. The effects of varying the study volume and reducing technologists' work hours were analyzed. By converting to soft-copy interpretation, we saved 6 min 32 sec per examination by eliminating film processing waiting time, thus reducing examination time from 30 min to 24 min. During an average day of 27 examinations, 176 min were saved. However, 33 min a day were spent retrieving prior studies from long-term storage; thus, 143 extra minutes a day were available for scanning. This improved efficiency could result in five more sonograms a day obtained by converting to soft-copy interpretation, using existing staff and equipment. Alternatively, five examinations a day would equate to one half of a full-time equivalent technologists position. Our analysis of costs considered that the hospital's anticipated growth of sonography and the depreciation of equipment during 5 years resulted in a savings of more than $606,000. Increasing the examinations by just 200 sonograms in the first year and no further growth resulted in a savings of more than $96,000. If the number of sonograms stayed constant, elimination of film printing alone resulted in a loss of approximately $157,000; reduction of one half of a full-time equivalent technologist's position would recuperate approximately $134

  9. Ways of decreasing the labour content and construction duration for the RBMK-1000 NPP

    International Nuclear Information System (INIS)

    Chernyshenko, V.M.

    1984-01-01

    Problems associated with reducing the labour content and duration of construction for the RBMK-1000 NPPs are considered. General and specific labour contents for construction of the first units at the Kursk and Chernobylsk, NPPs as well as progress chart for construction-installation work at the 1-st unit of the Smolensk and 3-d unit of the Chernobylsk NPPs are presented. The analysis has shown that reduction in the general labour costs and therefore, duration of construction can be attained by reducing the number of auxiliary objects, increasing the level and mechanization of construction (with optimum utilization of gantry and turret cranes) as well as by mechanization of placing concrete mortars and use of large-block structures. According to preliminary calculations, the introduction of new solutions would ensure reduction of construction periods to 24 months for the second units and reduction of labour content by 8 to 10% at the Kursk and Chernobylsk NPPs

  10. Quantifying costs and benefits of integrated environmental strategies of air quality management and greenhouse gas reduction in the Seoul Metropolitan Area

    International Nuclear Information System (INIS)

    Chae, Yeora; Park, Jeongim

    2011-01-01

    This study quantifies the costs and benefits of Integrated Environmental Strategies (IES) of reducing air pollutants and greenhouse gas (GHG) emissions at a minimal cost in the Seoul Metropolitan Area (SMPA) for the year 2014 and compares with current air quality management plans and greenhouse gas (GHG) mitigation plans. The results estimated health benefits from prevention of premature mortality under the IES scenario as 14 trillion Korean won (won) and associated cost as -3.6 trillion won, yielding total benefit, difference of benefits and costs, of 18 trillion won. With the inclusion of benefits from GHG reductions, the total benefits result in 147 trillion won. The difference of human health benefits and costs of air quality management plan and GHG reduction strategies result in 14 trillion won and 8 trillion won, respectively. The research shows that benefits of integrating air quality management and GHG reduction measures are greater than those obtained by air quality management and GHG reduction measures individually. - Highlights: → The costs and benefits of Integrated Environmental Strategies (IES) are quantified.→ Benefit under IES is 14 trillion Korean won and cost is -3.6 trillion won.→ Benefit of air quality management is 14 trillion won and cost is -0.3 trillion won.→ Benefit under GHG reduction is 1.5 trillion won and cost is -6.4 trillion won.→ Benefits of IES are greater than those obtained by each measure individually.

  11. Cost-effectiveness analysis of cochlear dose reduction by proton beam therapy for medulloblastoma in childhood

    International Nuclear Information System (INIS)

    Hirano, Emi; Kawabuchi, Koichi; Fuji, Hiroshi; Onoe, Tsuyoshi; Kumar, Vinay; Shirato, Hiroki

    2014-01-01

    The aim of this study is to evaluate the cost-effectiveness of proton beam therapy with cochlear dose reduction compared with conventional X-ray radiotherapy for medulloblastoma in childhood. We developed a Markov model to describe health states of 6-year-old children with medulloblastoma after treatment with proton or X-ray radiotherapy. The risks of hearing loss were calculated on cochlear dose for each treatment. Three types of health-related quality of life (HRQOL) of EQ-5D, HUI3 and SF-6D were used for estimation of quality-adjusted life years (QALYs). The incremental cost-effectiveness ratio (ICER) for proton beam therapy compared with X-ray radiotherapy was calculated for each HRQOL. Sensitivity analyses were performed to model uncertainty in these parameters. The ICER for EQ-5D, HUI3 and SF-6D were $21 716/QALY, $11 773/QALY, and $20 150/QALY, respectively. One-way sensitivity analyses found that the results were sensitive to discount rate, the risk of hearing loss after proton therapy, and costs of proton irradiation. Cost-effectiveness acceptability curve analysis revealed a 99% probability of proton therapy being cost effective at a societal willingness-to-pay value. Proton beam therapy with cochlear dose reduction improves health outcomes at a cost that is within the acceptable cost-effectiveness range from the payer's standpoint. (author)

  12. A CONCEPTUAL DISASTER RISK REDUCTION FRAMEWORK FOR HEALTH AND SAFETY HAZARDS IN THE CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Amir S. GOHARDANI

    2013-06-01

    Full Text Available The health and safety hazard status of construction workers is constantly challenged by the projects in the built environment. In this article, various aspects of health and safety hazards for construction workers have been reviewed and investigated through a disaster risk reduction prism. This approach has further led to the perception of glancing at the construction sector as an ongoing disaster zone and equally provides a new management perspective. From this perspective, the occurrence of a disaster within the construction sector corresponds to the temporary or permanent ill-health or death of a construction worker. Geographical location is one of the factors that play an important role in addressing the health and safety hazards for construction workers. In addition to the location, geographical considerations equally encapsulate regional, cultural, governmental and work ethical effects. These effects may potentially contribute to disparities in the construction sector. With an increasing level of understanding for health and safety hazards in the construction domain, more efficient prevention measures can be taken in order to enable a disaster management cycle, capable of responding to the rigorous demands of the construction sector.

  13. Potential Cost Savings From Reduction of Regional Variation in Medicare Spending

    Directory of Open Access Journals (Sweden)

    Yunjie Song

    2016-04-01

    Full Text Available Potential cost savings estimated from reduction of regional variation in Medicare spending are considerable but questioned. This article evaluates the validity of the principal methods that have been used in the estimations of the potential savings. Three estimation approaches were identified. The first approach uses adjusted expenditures to calculate avoidable costs, but adjusted expenditures can be independent of avoidable costs, and measurement errors are not controlled. The second approach uses an outcome variable to replace its causal factors, and is not acceptable because the association between the outcomes and the causes is untestable. The final approach uses surveys to directly measure physician beliefs and patient preferences, but the sole study using this approach is weakened by sample selection biases and incomplete controls. A development of reliable measures and a switch of observation from clinic settings to geographic contexts could make the estimations more convincing.

  14. Heliostat cost reduction study.

    Energy Technology Data Exchange (ETDEWEB)

    Jones, Scott A.; Lumia, Ronald. (University of New Mexico, Albuquerque, NM); Davenport, Roger (Science Applications International Corporation, San Diego, CA); Thomas, Robert C. (Advanced Thermal Systems, Centennial, CO); Gorman, David (Advanced Thermal Systems, Larkspur, CO); Kolb, Gregory J.; Donnelly, Matthew W.

    2007-06-01

    Power towers are capable of producing solar-generated electricity and hydrogen on a large scale. Heliostats are the most important cost element of a solar power tower plant. Since they constitute {approx} 50% of the capital cost of the plant it is important to reduce heliostat cost as much as possible to improve the economic performance of power towers. In this study we evaluate current heliostat technology and estimate a price of $126/m{sup 2} given year-2006 materials and labor costs for a deployment of {approx}600 MW of power towers per year. This 2006 price yields electricity at $0.067/kWh and hydrogen at $3.20/kg. We propose research and development that should ultimately lead to a price as low as $90/m{sup 2}, which equates to $0.056/kWh and $2.75/kg H{sup 2}. Approximately 30 heliostat and manufacturing experts from the United States, Europe, and Australia contributed to the content of this report during two separate workshops conducted at the National Solar Thermal Test Facility.

  15. SUBSTANTIATION OF THE COST OF HOUSING CONSTRUCTION INCLUDING THE FACTOR OF INVESTMENT ATTRACTIVENESS OF TERRITORIES

    Directory of Open Access Journals (Sweden)

    ZAIATS Yi. I.

    2015-11-01

    Full Text Available Problem statement. For planning and organization of urban construction is necessary to analyze the use of areas. Territorial resources of the city, being used for construction and other urban purposes, consists of plots of land: disposable, reserved and undeveloped in previous years of construction in progress; residential districts and blocks of obsolete housing fund; industrial and municipal and warehouse enterprises being used irrationally or stopped to work; the defence department, where the amortized warehouses and other main funds are that are not used by purpose; agricultural enterprises where the obsolete industrial funds, haying, nurseries, greenhouses. The number of free areas suitable for future urban development is extremely limited. However a considerable part of the territories of almost all functional zones is used inefficiently. Purpose. Formalization of a factor of investment attractiveness of territories for the further identification and research of the connection between it and the cost of housing construction is necessary. Conclusion. The identification of regularities of influence of the factor of investment attractiveness of territories on the cost of construction of high-rise buildings allow to obtain a quantitative estimate of this effect and can be used in the development of the methodology of substantiation of the expediency and effectiveness of the implementation of highrise construction projects, based on organizational and technological aspects.

  16. A dynamic model for assessing the effects of management strategies on the reduction of construction and demolition waste.

    Science.gov (United States)

    Yuan, Hongping; Chini, Abdol R; Lu, Yujie; Shen, Liyin

    2012-03-01

    During the past few decades, construction and demolition (C&D) waste has received increasing attention from construction practitioners and researchers worldwide. A plethora of research regarding C&D waste management has been published in various academic journals. However, it has been determined that existing studies with respect to C&D waste reduction are mainly carried out from a static perspective, without considering the dynamic and interdependent nature of the whole waste reduction system. This might lead to misunderstanding about the actual effect of implementing any waste reduction strategies. Therefore, this research proposes a model that can serve as a decision support tool for projecting C&D waste reduction in line with the waste management situation of a given construction project, and more importantly, as a platform for simulating effects of various management strategies on C&D waste reduction. The research is conducted using system dynamics methodology, which is a systematic approach that deals with the complexity - interrelationships and dynamics - of any social, economic and managerial system. The dynamic model integrates major variables that affect C&D waste reduction. In this paper, seven causal loop diagrams that can deepen understanding about the feedback relationships underlying C&D waste reduction system are firstly presented. Then a stock-flow diagram is formulated by using software for system dynamics modeling. Finally, a case study is used to illustrate the validation and application of the proposed model. Results of the case study not only built confidence in the model so that it can be used for quantitative analysis, but also assessed and compared the effect of three designed policy scenarios on C&D waste reduction. One major contribution of this study is the development of a dynamic model for evaluating C&D waste reduction strategies under various scenarios, so that best management strategies could be identified before being implemented

  17. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    Science.gov (United States)

    El-Alaily, T. M.; El-Nimr, M. K.; Saafan, S. A.; Kamel, M. M.; Meaz, T. M.; Assar, S. T.

    2015-07-01

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability.

  18. A Spatial-Economic Cost-Reduction Pathway Analysis for U.S. Offshore Wind Energy Development from 2015-2030

    Energy Technology Data Exchange (ETDEWEB)

    Beiter, Philipp; Stehly, Tyler

    2016-10-05

    The potential for cost reduction and economic viability for offshore wind varies considerably within the United States. This analysis models the cost impact of a range of offshore wind locational cost variables across more than 7,000 potential coastal sites in the United States' offshore wind resource area. It also assesses the impact of over 50 technology innovations on potential future costs between 2015 and 2027 (Commercial Operation Date) for both fixed-bottom and floating wind systems. Comparing these costs to an initial assessment of local avoided generating costs, this analysis provides a framework for estimating the economic potential for offshore wind. Analyzing economic potential within this framework can help establish a refined understanding across industries of the technology and site-specific risks and opportunities associated with future offshore wind development. The findings from the original report indicate that under the modeled scenario, offshore wind can be expected to achieve significant cost reductions and may approach economic viability in some parts of the United States within the next 15 years.

  19. How Expensive Is Expensive Enough? Opportunities for Cost Reductions in Offshore Wind Energy Logistics

    Directory of Open Access Journals (Sweden)

    Thomas Poulsen

    2016-06-01

    Full Text Available This paper reveals that logistics may conservatively amount to 18% of the levelized cost of energy for offshore wind farms. This is the key finding from an extensive case study carried out within the organization of the world’s leading offshore wind farm developer and operator. The case study aimed to, and produced, a number of possible opportunities for offshore wind cost reductions through logistics innovation; however, within the case study company, no company-wide logistics organization existed to focus horizontally on reducing logistics costs in general. Logistics was not well defined within the case study company, and a logistics strategy did not exist. With full life-cycle costs of offshore wind farms still high enough to present a political challenge within the European Union in terms of legislation to ensure offshore wind diffusion beyond 2020, our research presents logistics as a next frontier for offshore wind constituencies. This important area of the supply chain is ripe to academically and professionally cultivate and harvest in terms of offshore wind energy cost reductions. Our paper suggests that a focused organizational approach for logistics both horizontally and vertically within the company organizations could be the way forward, coupled with a long-term legislative environment to enable the necessary investments in logistics assets and transport equipment.

  20. Cost Control Strategies for Zero Energy Buildings: High-Performance Design and Construction on a Budget (Brochure)

    Energy Technology Data Exchange (ETDEWEB)

    2014-09-01

    There is mounting evidence that zero energy can, in many cases, be achieved within typical construction budgets. To ensure that the momentum behind zero energy buildings and other low-energy buildings will continue to grow, this guide assembles recommendations for replicating specific successes of early adopters who have met their energy goals while controlling costs. Contents include: discussion of recommended cost control strategies, which are grouped by project phase (acquisition and delivery, design, and construction) and accompanied by industry examples; recommendations for balancing key decision-making factors; and quick reference tables that can help teams apply strategies to specific projects.

  1. Cost-effective policy instruments for greenhouse gas emission reduction and fossil fuel substitution through bioenergy production in Austria

    International Nuclear Information System (INIS)

    Schmidt, Johannes; Leduc, Sylvain; Dotzauer, Erik; Schmid, Erwin

    2011-01-01

    Climate change mitigation and security of energy supply are important targets of Austrian energy policy. Bioenergy production based on resources from agriculture and forestry is an important option for attaining these targets. To increase the share of bioenergy in the energy supply, supporting policy instruments are necessary. The cost-effectiveness of these instruments in attaining policy targets depends on the availability of bioenergy technologies. Advanced technologies such as second-generation biofuels, biomass gasification for power production, and bioenergy with carbon capture and storage (BECCS) will likely change the performance of policy instruments. This article assesses the cost-effectiveness of energy policy instruments, considering new bioenergy technologies for the year 2030, with respect to greenhouse gas emission (GHG) reduction and fossil fuel substitution. Instruments that directly subsidize bioenergy are compared with instruments that aim at reducing GHG emissions. A spatially explicit modeling approach is used to account for biomass supply and energy distribution costs in Austria. Results indicate that a carbon tax performs cost-effectively with respect to both policy targets if BECCS is not available. However, the availability of BECCS creates a trade-off between GHG emission reduction and fossil fuel substitution. Biofuel blending obligations are costly in terms of attaining the policy targets. - Highlights: → Costs of energy policies and effects on reduction of CO 2 emissions and fossil fuel consumption. → Particular focus on new bioenergy production technologies such as second generation biofuels. → Spatially explicit techno-economic optimization model. → CO 2 tax: high costs for reducing fossil fuel consumption if carbon capture and storage is available. → Biofuel policy: no significant reductions in CO 2 emissions or fossil fuel consumption.

  2. Spacecraft COst REduction Team (SCORE): TQM/CI on a massive scale

    Science.gov (United States)

    Bullard, Jerry D.

    1992-01-01

    The business of building satellites and space systems has matured. Few missions require, or can afford, excellent performance at any price. The new paradigm is doing more with less, providing quality systems at lower cost--in other words, doing our job 'Faster-Better-Cheaper.' The TRW Spacecraft COst REduction (SCORE) initiative was launched in 1990 by Daniel S. Goldin, then general manager of TRW's Space & Technology Group. The SCORE mission is to apply continuous improvement (CI) techniques to effect major reductions in the cost (our primary goal) and span time (as a corollary) required for the production of spacecraft. SCORE is a multi-year initiative that is having a profound effect on both the procedural and the cultural aspects of how we do business. The objectives of this initiative are being realized. The focus of this paper is not on the results of SCORE per se, but rather on the things we have leaned about how to do continuous improvement on a massive scale, with multilevel (hierarchical) CI teams. The following sections summarize the chronology of the SCORE initiative, from team formation to development of the year-end report for 1991. Lessons learned, the core of this presentation, are discussed--with particular focus on the unique aspects of SCORE. The SCORE initiative is continuing and, as a part of our evolving culture, will never end. It has resulted in profound insights into the way we do work and (the topic at hand) how to do CI for large and complex multidisciplinary development activities.

  3. Manufacturing cost study on the ion sources for the Mirror Fusion Test Facility

    International Nuclear Information System (INIS)

    A study of the cost of manufacturing 48 ion sources for the Mirror Fusion Test Facility is described. The estimate is built up from individual part costs and assembly operation times for the 80 kV prototype source constructed by LLL and described by LLL drawings furnished during December 1978. Recommendations for cost reduction are made

  4. PowerFilm PowerShade Fixed Site Solar System Cost Reduction Plan

    Science.gov (United States)

    2014-07-31

    system was designed which adds capability of grid tie connection to the standalone function. This battery operating system has built-in intelligence...goal concerning alternative conductive grid inks was to reduce the cost of the silver ink layer without a reduction in PV power with experimentation... system . To overcome this loss, a new BOS unit with higher power transfer efficiency has been developed. This system also has grid tie

  5. Open-source digital technologies for low-cost monitoring of historical constructions

    OpenAIRE

    Basto, Camilo; Pelà, Luca; Chacón Flores, Rolando Antonio

    2017-01-01

    This paper shows new possibilities of using novel, open-source, low-cost platforms for the structural health monitoring of heritage structures. The objective of the study is to present an assessment of increasingly available open-source digital modeling and fabrication technologies in order to identify the suitable counterparts of the typical components of a continuous static monitoring system for a historical construction. The results of the research include a simple case-study, which is pre...

  6. Factory '82 - 30% reduction of operation cost at short term. Fabrik '82. Kurzzeitig 30% der Betriebskosten beeinflussen

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The present-day situation of many companies is characterized by a decreasing production volume. Consequences and effects of this phenomenon on production and ancillary branches are presented and analysed under aspects of cost, measures are described for influencing operation cost in an effective and continuing way at short term: cost of energy and disposal, heat insulation and heat recovery, cost reduction by computer application, cost reduction with material flow, operational cost analyses with detection of weak spots. Replanning factories and subsections which frequently have shown to be necessary - new planning projects have become more or less rare these days - is accounted for by the range of problem-related topics. Next to issues of CAD in factory planning, another approach is demonstrated which is still underutilized when designing and using factory buildings in keeping with cost: value-analysis factory planning.

  7. Data Flow in Relation to Life-Cycle Costing of Construction Projects in the Czech Republic

    Science.gov (United States)

    Biolek, Vojtěch; Hanák, Tomáš; Marović, Ivan

    2017-10-01

    Life-cycle costing is an important part of every construction project, as it makes it possible to take into consideration future costs relating to the operation and demolition phase of a built structure. In this way, investors can optimize the project design to minimize the total project costs. Even though there have already been some attempts to implement BIM software in the Czech Republic, the current state of affairs does not support automated data flow between the bill of costs and applications that support building facility management. The main aim of this study is to critically evaluate the current situation and outline a future framework that should allow for the use of the data contained in the bill of costs to manage building operating costs.

  8. Unit Price and Cost Estimation Equations through Items Percentage of Construction Works in a Desert Area

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem

    2015-02-01

    Full Text Available This research will cover different aspects of estimating process of construction work in a desert area. The inherent difficulties which accompany the cost estimating of the construction works in desert environment in a developing country, will stem from the limited information available, resources scarcity, low level of skilled workers, the prevailing severe weather conditions and many others, which definitely don't provide a fair, reliable and accurate estimation. This study tries to present unit price to estimate the cost in preliminary phase of a project. Estimations are supported by developing mathematical equations based on the historical data of maintenance, new construction of managerial and school projects. Meanwhile, the research has determined the percentage of project items, in such a remote environment. Estimation equations suitable for remote areas have been formulated. Moreover, a procedure for unite price calculation is concluded.

  9. A construction process model for implementing constructability in construction

    NARCIS (Netherlands)

    Langkemper, J.; Al-Jibouri, S.; Reymen, I.M.M.J.; Maas, G.J.; Gassel, van F.

    2003-01-01

    In construction, failure of design professionals to consider how a builder will implement the design can result in scheduling problems, cost escalation, delays and disputes during the construction process. The integration of construction knowledge and experience during planning and design is termed

  10. Analysis of Fuel Cell Markets in Japan and the US: Experience Curve Development and Cost Reduction Disaggregation

    Energy Technology Data Exchange (ETDEWEB)

    Wei, Max [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Smith, Sarah J. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Sohn, Michael D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-07-15

    Fuel cells are both a longstanding and emerging technology for stationary and transportation applications, and their future use will likely be critical for the deep decarbonization of global energy systems. As we look into future applications, a key challenge for policy-makers and technology market forecasters who seek to track and/or accelerate their market adoption is the ability to forecast market costs of the fuel cells as technology innovations are incorporated into market products. Specifically, there is a need to estimate technology learning rates, which are rates of cost reduction versus production volume. Unfortunately, no literature exists for forecasting future learning rates for fuel cells. In this paper, we look retrospectively to estimate learning rates for two fuel cell deployment programs: (1) the micro-combined heat and power (CHP) program in Japan, and (2) the Self-Generation Incentive Program (SGIP) in California. These two examples have a relatively broad set of historical market data and thus provide an informative and international comparison of distinct fuel cell technologies and government deployment programs. We develop a generalized procedure for disaggregating experience-curve cost-reductions in order to disaggregate the Japanese fuel cell micro-CHP market into its constituent components, and we derive and present a range of learning rates that may explain observed market trends. Finally, we explore the differences in the technology development ecosystem and market conditions that may have contributed to the observed differences in cost reduction and draw policy observations for the market adoption of future fuel cell technologies. The scientific and policy contributions of this paper are the first comparative experience curve analysis of past fuel cell technologies in two distinct markets, and the first quantitative comparison of a detailed cost model of fuel cell systems with actual market data. The resulting approach is applicable to

  11. Conference 'onshore and offshore wind energy cost reduction: challenges and opportunities for the industry in France and in Germany'

    International Nuclear Information System (INIS)

    Abadie, Pierre-Marie; Hinsch, Thomas; Wallasch, Anna-Kathrin; Giese, Norbert; Guyet, Quentin; Lenhardt, Edouard; Beinke, Thies; Bodenstab, Marc; Wolff, Nicolas; Burkhardt, Claus; Lessmeister, Andreas L.

    2012-01-01

    The French-German office for Renewable energies (OFAEnR) organised a conference on cost reduction in onshore and offshore wind energy. In the framework of this French-German exchange of experience, about 140 participants exchanged views on the cost allocation in onshore wind energy projects, on their financing, and on the transport and logistics profitability challenges. Concrete examples of operating and maintenance cost reductions in offshore wind energy projects were presented as well. This document brings together the available presentations (slides) made during this event: 1 - Overview of France's onshore and offshore wind support policies (Pierre-Marie Abadie); 2 - Keynote: Framework conditions for cost reductions in the German wind energy sector (Thomas Hinsch); 3 - Cost of onshore wind energy projects in Germany - Status and experience feedback (Anna-Kathrin Wallasch); 4 - Crown estate's Offshore Wind Cost Reduction Pathways Study: how to transpose the conclusions to the German case (Norbert Giese); 5 - Combined Forces for Reliable Supply Chain - French-German Convergence of expertise: strategic partnerships for offshore projects implementation (Quentin Guyet, Edouard Lenhardt); 6 - Reducing costs of onshore and offshore wind energy. Mon2Sea research project - Real-time monitoring of transport and cargo handling of components for the offshore installation of wind turbines (Thies Beinke, Marc Bodenstab); 7 - expertise, Innovation and reduction of cost of energy: Vestas experience (Nicolas Wolff); 8 - Far-Offshore-Wind projects. Results of the First German Offshore Windpark alpha ventus (Claus Burkhardt); 9 - Maintenance for Offshore-Wind parks: examples and good practices for the future (Andreas L. Lessmeister)

  12. 48 CFR 1615.407-1 - Rate reduction for defective pricing or defective cost or pricing data.

    Science.gov (United States)

    2010-10-01

    ... defective pricing or defective cost or pricing data. 1615.407-1 Section 1615.407-1 Federal Acquisition... CONTRACTING METHODS AND CONTRACT TYPES CONTRACTING BY NEGOTIATION Contract Pricing 1615.407-1 Rate reduction for defective pricing or defective cost or pricing data. The clause set forth in section 1652.215-70...

  13. 48 CFR 1652.215-70 - Rate Reduction for Defective Pricing or Defective Cost or Pricing Data.

    Science.gov (United States)

    2010-10-01

    ... Defective Pricing or Defective Cost or Pricing Data. 1652.215-70 Section 1652.215-70 Federal Acquisition... CLAUSES AND FORMS CONTRACT CLAUSES Texts of FEHBP Clauses 1652.215-70 Rate Reduction for Defective Pricing or Defective Cost or Pricing Data. As prescribed in 1615.407-1, the following clause shall be...

  14. Model of investment appraisal of high-rise construction with account of cost of land resources

    Science.gov (United States)

    Okolelova, Ella; Shibaeva, Marina; Trukhina, Natalya

    2018-03-01

    The article considers problems and potential of high-rise construction as a global urbanization. The results of theoretical and practical studies on the appraisal of investments in high-rise construction are provided. High-rise construction has a number of apparent upsides in modern terms of development of megapolises and primarily it is economically efficient. Amid serious lack of construction sites, skyscrapers successfully deal with the need of manufacturing, office and living premises. Nevertheless, there are plenty issues, which are related with high-rise construction, and only thorough scrutiny of them allow to estimate the real economic efficiency of this branch. The article focuses on the question of economic efficiency of high-rise construction. The suggested model allows adjusting the parameters of a facility under construction, setting the tone for market value as well as the coefficient for appreciation of the construction net cost, that depends on the number of storey's, in the form of function or discrete values.

  15. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.; Clancey, William J.; McDonald, Aaron; Toschlog, Jason; Tucker, Tyson; Khan, Ahmed; Madrid, Steven (Eric)

    2011-01-01

    In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

  16. Application Of The Work Breakdown Structure In Determining Cost Buffers In Construction Schedules

    Directory of Open Access Journals (Sweden)

    Połoński M.

    2015-03-01

    Full Text Available The paper presents methods of determining the location of cost buffers and corresponding contingency costs in the CPM schedule based on its work breakdown structure. Application of correctly located cost buffers with appropriately established reserve costs is justified by the common overrunning of scheduled costs in construction projects. Interpolated cost buffers (CB as separate tasks have been combined with relevant summary tasks by the start–to–start (SS relationship, whereas the time of their execution has been dynamically connected with the time of accomplishment of particular summary tasks using the “paste connection” option. Besides cost buffers linked with the group of tasks assigned to summary tasks, a definition of the cost buffer for the entire project (PCB has been proposed, i.e. as one initial task of the entire project. Contingency costs corresponding to these buffers, depending on the data that the planner has at his disposal, can be determined using different methods, but always depend on the costs of all tasks protected by each buffer. The paper presents an exemplary schedule for a facility and the method of determining locations and cost for buffers CB and PCB, as well as their influence on the course of the curve illustrating the budgeted cost of work scheduled (BCWS. The proposed solution has been adjusted and presented with consideration of the possibilities created by the scheduling software MS Project, though its general assumptions may be implemented with application of other similar specialist tools.

  17. The influence of management and construction methods in the repair costs of Spain’s low-volume road network

    Directory of Open Access Journals (Sweden)

    Eutiquio Gallego

    2016-06-01

    Full Text Available This paper describes the entire process of the implementation of the Spanish low volume road network, including the design criteria, the construction techniques and the management policies during all the periods. The current situation of low volume roads in Spain was analyzed with respect to the legal framework and their actual condition. In addition, the budget required for the repair of 41 low volume roads throughout Spain was calculated in order to statistically analyze the influence of the pavement materials and the period of construction. The main conclusions were that low volume roads constructed during the 1970´s are currently those in the best state of repair and those requiring the lower repair costs, even lower than those constructed after 1980´s. In addition, low volume roads constructed with higher quality materials and using standardized techniques required five times lower repair costs than those made of lower quality materials.

  18. PERSONNEL COSTS IN THE CZECH CONSTRUCTION SECTOR: INVESTIGATING THE EFFECT OF COMPANY SIZE

    Directory of Open Access Journals (Sweden)

    Martina Paulišová

    2017-01-01

    Full Text Available : Managing personnel costs is important in all companies, especially in those whose production is labor intensive. The construction sector therefore qualifies as a suitable area for analyzing issues associated with these costs. The aim of this study is to find out whether company size affects personnel cost management under various circumstances. Four research hypotheses focus on the relationships among and the relative importance of personnel costs, use of standards, range of employee benefits offered, and economic actions taken when faced with an economic crisis. The evaluation of hypotheses is supported by using the chi-square test of independence with the aim of confirming or rejecting the statistical significance of relationships between the examined categorical variables. Results have confirmed a significant effect of company size. Several research implications and suggested future research directions are also presented in the conclusion of this paper.

  19. Integrated Cost and Schedule Control Systems for Nuclear Power Plant Construction: Leveraging Strategic Advantages to Owners and EPC Firms

    Directory of Open Access Journals (Sweden)

    Youngsoo Jung

    2015-01-01

    Full Text Available As the owners expect that the cost and time for nuclear power plant construction would decrease with new entrants into the market, there will be severer competition in the nuclear industry. In order to achieve performance improvement and to attain competitive advantages under the globalized competition, practitioners and researchers in the nuclear industry have recently exerted efforts to develop an advanced and efficient management methodology for the nuclear mega-projects. Among several candidates, integrated cost and schedule control system is of great concern because it can effectively manage the three most important project performances including cost, time, and quality. In this context, the purpose of this paper is to develop a project numbering system (PNS of integrated cost and schedule control system for nuclear power plant construction. Distinct attributes of nuclear power plant construction were investigated first in order to identify influencing variables that characterize real-world implementation of advanced cost and schedule controls. A scenario was then developed and analysed to simulate a case-project. By using this case-project, proposed management requirements, management methods, measurement techniques, data structure, and data collection methods for integrated cost and schedule PNS were illustrated. Finally, findings and implications are outlined, and recommendations for further research are presented.

  20. VIP in construction: systematic development and evaluation of a multifaceted health programme aiming to improve physical activity levels and dietary patterns among construction workers

    Directory of Open Access Journals (Sweden)

    Viester Laura

    2012-01-01

    Full Text Available Abstract Background The prevalence of both overweight and musculoskeletal disorders (MSD in the construction industry is high. Many interventions in the occupational setting aim at the prevention and reduction of these health problems, but it is still unclear how these programmes should be designed. To determine the effectiveness of interventions on these health outcomes randomised controlled trials (RCTs are needed. The aim of this study is to systematically develop a tailored intervention for prevention and reduction of overweight and MSD among construction workers and to describe the evaluation study regarding its (cost-effectiveness. Methods/Design The Intervention Mapping (IM protocol was applied to develop and implement a tailored programme aimed at the prevention and reduction of overweight and MSD. The (cost- effectiveness of the intervention programme will be evaluated using an RCT. Furthermore, a process evaluation will be conducted. The research population will consist of blue collar workers of a large construction company in the Netherlands. Intervention The intervention programme will be aimed at improving (vigorous physical activity levels and healthy dietary behaviour and will consist of tailored information, face-to-face and telephone counselling, training instruction (a fitness "card" to be used for exercises, and materials designed for the intervention (overview of the company health promoting facilities, waist circumference measuring tape, pedometer, BMI card, calorie guide, recipes, and knowledge test. Main study parameters/endpoints The intervention effect on body weight and waist circumference (primary outcome measures, as well as on lifestyle behaviour, MSD, fitness, CVD risk indicators, and work-related outcomes (i.e. productivity, sick leave (secondary outcome measures will be assessed. Discussion The development of the VIP in construction intervention led to a health programme tailored to the needs of construction

  1. Cost-effectiveness in fall prevention for older women.

    Science.gov (United States)

    Hektoen, Liv F; Aas, Eline; Lurås, Hilde

    2009-08-01

    The aim of this study was to estimate the cost-effectiveness of implementing an exercise-based fall prevention programme for home-dwelling women in the > or = 80-year age group in Norway. The impact of the home-based individual exercise programme on the number of falls is based on a New Zealand study. On the basis of the cost estimates and the estimated reduction in the number of falls obtained with the chosen programme, we calculated the incremental costs and the incremental effect of the exercise programme as compared with no prevention. The calculation of the average healthcare cost of falling was based on assumptions regarding the distribution of fall injuries reported in the literature, four constructed representative case histories, assumptions regarding healthcare provision associated with the treatment of the specified cases, and estimated unit costs from Norwegian cost data. We calculated the average healthcare costs per fall for the first year. We found that the reduction in healthcare costs per individual for treating fall-related injuries was 1.85 times higher than the cost of implementing a fall prevention programme. The reduction in healthcare costs more than offset the cost of the prevention programme for women aged > or = 80 years living at home, which indicates that health authorities should increase their focus on prevention. The main intention of this article is to stipulate costs connected to falls among the elderly in a transparent way and visualize the whole cost picture. Cost-effectiveness analysis is a health policy tool that makes politicians and other makers of health policy conscious of this complexity.

  2. A Cost Effectiveness Analysis of Salt Reduction Policies to Reduce Coronary Heart Disease in Four Eastern Mediterranean Countries

    Science.gov (United States)

    Mason, Helen; Shoaibi, Azza; Ghandour, Rula; O'Flaherty, Martin; Capewell, Simon; Khatib, Rana; Jabr, Samer; Unal, Belgin; Sözmen, Kaan; Arfa, Chokri; Aissi, Wafa; Romdhane, Habiba Ben; Fouad, Fouad; Al-Ali, Radwan; Husseini, Abdullatif

    2014-01-01

    Background Coronary Heart Disease (CHD) is rising in middle income countries. Population based strategies to reduce specific CHD risk factors have an important role to play in reducing overall CHD mortality. Reducing dietary salt consumption is a potentially cost-effective way to reduce CHD events. This paper presents an economic evaluation of population based salt reduction policies in Tunisia, Syria, Palestine and Turkey. Methods and Findings Three policies to reduce dietary salt intake were evaluated: a health promotion campaign, labelling of food packaging and mandatory reformulation of salt content in processed food. These were evaluated separately and in combination. Estimates of the effectiveness of salt reduction on blood pressure were based on a literature review. The reduction in mortality was estimated using the IMPACT CHD model specific to that country. Cumulative population health effects were quantified as life years gained (LYG) over a 10 year time frame. The costs of each policy were estimated using evidence from comparable policies and expert opinion including public sector costs and costs to the food industry. Health care costs associated with CHDs were estimated using standardized unit costs. The total cost of implementing each policy was compared against the current baseline (no policy). All costs were calculated using 2010 PPP exchange rates. In all four countries most policies were cost saving compared with the baseline. The combination of all three policies (reducing salt consumption by 30%) resulted in estimated cost savings of $235,000,000 and 6455 LYG in Tunisia; $39,000,000 and 31674 LYG in Syria; $6,000,000 and 2682 LYG in Palestine and $1,3000,000,000 and 378439 LYG in Turkey. Conclusion Decreasing dietary salt intake will reduce coronary heart disease deaths in the four countries. A comprehensive strategy of health education and food industry actions to label and reduce salt content would save both money and lives. PMID:24409297

  3. Measures for the reduction of sinter formations in tunnels

    Science.gov (United States)

    Harer, Gerhard

    2017-09-01

    A considerable part of the maintenance costs of tunnel structures is related to the inspection, maintenance and repair of the drainage system. The drainage system of tunnels is frequently clogged with Calcium precipitates. Cleaning and water conditioning are costintensive for operating companies. Apart from the direct costs associated with inspection, maintenance and repair works of the drainage system indirect costs are generated, such as by the blocking of the tunnel while inspection, maintenance or repair or by the reduction of the permitted operation speed. Sintering and clogging of the drainage systems is mainly caused by dissolution of cement minerals in concrete and mortar and/or by inadequate design and construction of the drainage system and/or grubby workmanship. With long-term studies and in-situ experiments in Austria traffic tunnels the specific input factors for sinter mechanism have been identified and appropriate counter measures could be defined. In particular modified mix designs for shotcretes and mortars have proven to bring a significant beneficial effect. By means of constructional measures and by the application of hardness stabilizers a further reduction of hard deposits inside the drainage system is achievable. The paper will deal with the specific aspects and will propose adequate counter measures.

  4. Cost of and soil loss on "minimum-standard" forest truck roads constructed in the central Appalachians

    Science.gov (United States)

    J. N. Kochenderfer; G. W. Wendel; H. Clay Smith

    1984-01-01

    A "minimum-standard" forest truck road that provides efficient and environmentally acceptable access for several forest activities is described. Cost data are presented for eight of these roads constructed in the central Appalachians. The average cost per mile excluding gravel was $8,119. The range was $5,048 to $14,424. Soil loss was measured from several...

  5. A framework of initiatives for successful application of life cycle costing (LCC in industrialised building system (IBS in Malaysian construction industry

    Directory of Open Access Journals (Sweden)

    Shamsuddin Siti Mazzuana

    2017-01-01

    Full Text Available Industrialised Building System (IBS contributes a great shift in sustainable construction and benefits the society. Previous studies have proven in general that one of the hindrances in promoting sustainable in IBS, is a high cost for any pre-cast material specifically thus effected the overall cost. The introduction of Life Cycle Costing (LCC leads into providing a better and comprehensive cost estimation, including projecting actual cost to operate the building, hence providing a better baseline for decision making. The lacking application of LCC in IBS is still in trivial impact, therefore, this paper presents a framework which produced by expressing the successful initiatives of LCC and IBS in Malaysia construction industry. The framework developed based on findings from the extensive literature reviews, 164 responded questionnaires, and 19 expert opinions, which has three sections: Strategy Development, System Development and the last part is Decision Level. Aspects of objectivity, practicality, reliability, completeness that were likely to be implemented in the Malaysian construction industry were used. There are significant opinions on the usefulness and completeness of the proposed framework in providing a comprehensive cost estimates which helps much in deciding to carry out IBS or remain with a traditional construction method.

  6. Cost reduction from resolution/improvement of carcinoid syndrome symptoms following treatment with above-standard dose of octreotide LAR.

    Science.gov (United States)

    Huynh, Lynn; Totev, Todor; Vekeman, Francis; Neary, Maureen P; Duh, Mei S; Benson, Al B

    2017-09-01

    To calculate the cost reduction associated with diarrhea/flushing symptom resolution/improvement following treatment with above-standard dose octreotide-LAR from the commercial payor's perspective. Diarrhea and flushing are two major carcinoid syndrome symptoms of neuroendocrine tumor (NET). Previously, a study of NET patients from three US tertiary oncology centers (NET 3-Center Study) demonstrated that dose escalation of octreotide LAR to above-standard dose resolved/improved diarrhea/flushing in 79% of the patients within 1 year. Time course of diarrhea/flushing symptom data were collected from the NET 3-Center Study. Daily healthcare costs were calculated from a commercial claims database analysis. For the patient cohort experiencing any diarrhea/flushing symptom resolution/improvement, their observation period was divided into days of symptom resolution/improvement or no improvement, which were then multiplied by the respective daily healthcare cost and summed over 1 year to yield the blended mean annual cost per patient. For patients who experienced no diarrhea/flushing symptom improvement, mean annual daily healthcare cost of diarrhea/flushing over a 1-year period was calculated. The economic model found that 108 NET patients who experienced diarrhea/flushing symptom resolution/improvement within 1 year had statistically significantly lower mean annual healthcare cost/patient than patients with no symptom improvement, by $14,766 (p = .03). For the sub-set of 85 patients experiencing resolution/improvement of diarrhea, their cost reduction was more pronounced, at $18,740 (p = .01), statistically significantly lower than those with no improvement; outpatient costs accounted for 56% of the cost reduction (p = .02); inpatient costs, emergency department costs, and pharmacy costs accounted for the remaining 44%. The economic model relied on two different sources of data, with some heterogeneity in the prior treatment and disease status of patients

  7. The Cost of Class Size Reduction: Advice for Policymakers. RAND Graduate School Dissertation.

    Science.gov (United States)

    Reichardt, Robert E.

    This dissertation provides information to state-level policymakers that will help them avoid two implementation problems seen in the past in California's class-size-reduction (CSR) reform. The first problem was that flat, per student reimbursement did not adequately cover costs in districts with larger pre-CSR class-sizes or smaller schools. The…

  8. Recent evolutions of French design and construction rules

    Energy Technology Data Exchange (ETDEWEB)

    Lambs, R.; Grandemange, J.M. [Framatome ANP GmbH - NBTT, Erlangen (Germany); Paris, D.; Faidy, C. [Electricite de France (EDF), 75 - Paris (France)

    2001-07-01

    This paper summarises the studies and evaluations made in order to support the recent evolutions of the French Design and Construction Rules, with the objective to improve the competitiveness of nuclear power plants. To this aim, an inquiry was conducted with Suppliers, in order to identify the topics corresponding to cost reduction potentials. Following this inquiry, the RCC-M construction code provisions which may be improved in order to reduce the cost were identified and highlighted compared to the others cost-intensive requirements falling outside the code scope. In parallel, other non-nuclear codes, such as CODAP and CODETI in France for Vessels, heat exchangers and piping, and ASME VIII were analysed in order to evaluate the possibility to refer to more standard alternatives for safety related mechanical components. In such a case, eventual complementary requirements should be specified, and some exercises of application were conducted with the suppliers on typical examples. In order to finalize the overview, return of operating experience was addressed and discussed with the Safety Authority, leading to complementary precautions, in particular on fatigue and fast fracture prevention. The corresponding revisions have been included in the 2000 edition of the RCC-M construction code. (author)

  9. Recent evolutions of French design and construction rules

    International Nuclear Information System (INIS)

    Lambs, R.; Grandemange, J.M.; Paris, D.; Faidy, C.

    2001-01-01

    This paper summarises the studies and evaluations made in order to support the recent evolutions of the French Design and Construction Rules, with the objective to improve the competitiveness of nuclear power plants. To this aim, an inquiry was conducted with Suppliers, in order to identify the topics corresponding to cost reduction potentials. Following this inquiry, the RCC-M construction code provisions which may be improved in order to reduce the cost were identified and highlighted compared to the others cost-intensive requirements falling outside the code scope. In parallel, other non-nuclear codes, such as CODAP and CODETI in France for Vessels, heat exchangers and piping, and ASME VIII were analysed in order to evaluate the possibility to refer to more standard alternatives for safety related mechanical components. In such a case, eventual complementary requirements should be specified, and some exercises of application were conducted with the suppliers on typical examples. In order to finalize the overview, return of operating experience was addressed and discussed with the Safety Authority, leading to complementary precautions, in particular on fatigue and fast fracture prevention. The corresponding revisions have been included in the 2000 edition of the RCC-M construction code. (author)

  10. Sustainable Construction Risk Perceptions in the Kuwaiti Construction Industry

    Directory of Open Access Journals (Sweden)

    Dalya Ismael

    2018-06-01

    Full Text Available Sustainable construction is fundamentally different than traditional construction because it requires whole systems thinking, early collaboration across stakeholders, and core principles like reducing resource consumption, eliminating toxins, and applying life cycle costing. Construction professionals unfamiliar with this mindset and approach may perceive sustainable construction as risky. One of the global regions in need of more sustainable construction is the Middle Eastern and North African (MENA region. The MENA region is one of the fastest developing in the world. However, it is the slowest one in implementing sustainable construction practices. Kuwait, in particular, contributes 53% more carbon emissions per capita than the United States. To understand how the Kuwaiti construction industry perceives risks associated with more sustainable construction, a survey was developed with 52 risk elements in which 131 industry professionals responded. The results indicate that industry professionals perceive a lack of public awareness as the risk element with the highest probability of occurrence. The risk element with the highest possible negative impact on future projects is designers’ and contractors’ inexperience with sustainable construction. Other risks were found to include a high initial cost for materials and overall project costs. Educational interventions, changes in risk allocation, and behavioral science to reframe upfront costs as long-term savings are offered as possible solutions.

  11. Simulation of value stream mapping and discrete optimization of energy consumption in modular construction

    Science.gov (United States)

    Chowdhury, Md Mukul

    With the increased practice of modularization and prefabrication, the construction industry gained the benefits of quality management, improved completion time, reduced site disruption and vehicular traffic, and improved overall safety and security. Whereas industrialized construction methods, such as modular and manufactured buildings, have evolved over decades, core techniques used in prefabrication plants vary only slightly from those employed in traditional site-built construction. With a focus on energy and cost efficient modular construction, this research presents the development of a simulation, measurement and optimization system for energy consumption in the manufacturing process of modular construction. The system is based on Lean Six Sigma principles and loosely coupled system operation to identify the non-value adding tasks and possible causes of low energy efficiency. The proposed system will also include visualization functions for demonstration of energy consumption in modular construction. The benefits of implementing this system include a reduction in the energy consumption in production cost, decrease of energy cost in the production of lean-modular construction, and increase profit. In addition, the visualization functions will provide detailed information about energy efficiency and operation flexibility in modular construction. A case study is presented to validate the reliability of the system.

  12. Low cost biological lung volume reduction therapy for advanced emphysema

    Directory of Open Access Journals (Sweden)

    Bakeer M

    2016-08-01

    Full Text Available Mostafa Bakeer,1 Taha Taha Abdelgawad,1 Raed El-Metwaly,1 Ahmed El-Morsi,1 Mohammad Khairy El-Badrawy,1 Solafa El-Sharawy2 1Chest Medicine Department, 2Clinical Pathology Department, Faculty of Medicine, Mansoura University, Mansoura, Egypt Background: Bronchoscopic lung volume reduction (BLVR, using biological agents, is one of the new alternatives to lung volume reduction surgery.Objectives: To evaluate efficacy and safety of biological BLVR using low cost agents including autologous blood and fibrin glue.Methods: Enrolled patients were divided into two groups: group A (seven patients in which autologous blood was used and group B (eight patients in which fibrin glue was used. The agents were injected through a triple lumen balloon catheter via fiberoptic bronchoscope. Changes in high resolution computerized tomography (HRCT volumetry, pulmonary function tests, symptoms, and exercise capacity were evaluated at 12 weeks postprocedure as well as for complications.Results: In group A, at 12 weeks postprocedure, there was significant improvement in the mean value of HRCT volumetry and residual volume/total lung capacity (% predicted (P-value: <0.001 and 0.038, respectively. In group B, there was significant improvement in the mean value of HRCT volumetry and (residual volume/total lung capacity % predicted (P-value: 0.005 and 0.004, respectively. All patients tolerated the procedure with no mortality.Conclusion: BLVR using autologous blood and locally prepared fibrin glue is a promising method for therapy of advanced emphysema in term of efficacy, safety as well as cost effectiveness. Keywords: BLVR, bronchoscopy, COPD, interventional pulmonology

  13. Design Optimization and Construction of the Thyratron/PFN Based Cost Model Modulator for the NLC

    International Nuclear Information System (INIS)

    Koontz, Roland F

    1999-01-01

    As design studies and various R and D efforts continue on Next Linear Collider (NLC) systems, much R and D work is being done on X-Band klystron development, and development of pulse modulators to drive these X-Band klystrons. A workshop on this subject was held at SLAC in June of 1998, and a follow-up workshop is scheduled at SLAC June 23-25, 1999. At the 1998 workshop, several avenues of R and D were proposed using solid state switching, induction LINAC principles, high voltage hard tubes, and a few more esoteric ideas. An optimized version of the conventional thyratron-PFN-pulse transformer modulator for which there is extensive operating experience is also a strong candidate for use in the NLC. Such a modulator is currently under construction for base line demonstration purposes. The performance of this ''Cost Model'' modulator will be compared to other developing technologies. Important parameters including initial capital cost, operating maintenance cost, reliability, maintainability, power efficiency, in addition to the usual operating parameters of pulse flatness, timing and pulse height jitter, etc. will be considered in the choice of a modulator design for the NLC. This paper updates the progress on this ''Cost Model'' modulator design and construction

  14. Competition between biofuels. Modeling technological learning and cost reductions over time

    International Nuclear Information System (INIS)

    De Wit, M.; Junginger, M.; Faaij, A.; Lensink, S.M.; Londo, H.M.

    2009-10-01

    A key aspect in modeling the (future) competition between biofuels is the way in which production cost developments are computed. The objective of this study was threefold: (1) to construct a (endogenous) relation between cost development and cumulative production (2) to implement technological learning based on both engineering study insights and an experience curve approach, and (3) to investigate the impact of different technological learning assumptions on the market diffusion patterns of different biofuels. The analysis was executed with the European biofuel model BioTrans, which computes the least cost biofuel route. The model meets an increasing demand, reaching a 25% share of biofuels of the overall European transport fuel demand by 2030. Results show that 1st generation biodiesel is the most cost competitive fuel, dominating the early market. With increasing demand, modestly productive oilseed crops become more expensive rapidly, providing opportunities for advanced biofuels to enter the market. While biodiesel supply typically remains steady until 2030, almost all additional yearly demands are delivered by advanced biofuels, supplying up to 60% of the market by 2030. Sensitivity analysis shows that (a) overall increasing investment costs favour biodiesel production, (b) separate gasoline and diesel subtargets may diversify feedstock production and technology implementation, thus limiting the risk of failure and preventing lock-in and (c) the moment of an advanced technology's commercial market introduction determines, to a large degree, its future chances for increasing market share.

  15. Modern methods of cost saving of the production activity in construction

    Science.gov (United States)

    Silka, Dmitriy

    2017-10-01

    Every time economy faces recession, cost saving questions acquire increased urgency. This article shows how companies of the construction industry have switched to the new kind of economic relations over recent years. It is specified that the dominant type of economic relations does not allow to quickly reorient on the necessary tools in accordance with new requirements of economic activity. Successful experience in the new environment becomes demanded. Cost saving methods, which were proven in other industries, are offered for achievement of efficiency and competitiveness of the companies. Analysis is performed on the example of the retail sphere, which, according to the authoritative analytical reviews, is extremely innovative on both local and world economic levels. At that, methods, based on the modern unprecedentedly high opportunities of communications and informational exchange took special place among offered methods.

  16. Comparison of cost effectiveness of risk reduction among different energy systems: French case studies. Final report of the co-ordinated research programme

    International Nuclear Information System (INIS)

    Lochard, Jacques

    1989-08-01

    This report presents the three French case studies performed in the framework of the coordinated research program on 'Comparison of Cost-effectiveness of Risk Reduction among different Energy Systems': Cost effectiveness of robotics and remote tooling for occupational risk reduction at a nuclear fuel fabrication facility; Cost-effectiveness of protection actions to reduce occupational exposures in underground uranium mines; Cost-effectiveness of safety measures to reduce public risk associated with the transportation of UF 6 by truck and trains

  17. Reward Pays the Cost of Noise Reduction in Motor and Cognitive Control.

    Science.gov (United States)

    Manohar, Sanjay G; Chong, Trevor T-J; Apps, Matthew A J; Batla, Amit; Stamelou, Maria; Jarman, Paul R; Bhatia, Kailash P; Husain, Masud

    2015-06-29

    Speed-accuracy trade-off is an intensively studied law governing almost all behavioral tasks across species. Here we show that motivation by reward breaks this law, by simultaneously invigorating movement and improving response precision. We devised a model to explain this paradoxical effect of reward by considering a new factor: the cost of control. Exerting control to improve response precision might itself come at a cost--a cost to attenuate a proportion of intrinsic neural noise. Applying a noise-reduction cost to optimal motor control predicted that reward can increase both velocity and accuracy. Similarly, application to decision-making predicted that reward reduces reaction times and errors in cognitive control. We used a novel saccadic distraction task to quantify the speed and accuracy of both movements and decisions under varying reward. Both faster speeds and smaller errors were observed with higher incentives, with the results best fitted by a model including a precision cost. Recent theories consider dopamine to be a key neuromodulator in mediating motivational effects of reward. We therefore examined how Parkinson's disease (PD), a condition associated with dopamine depletion, alters the effects of reward. Individuals with PD showed reduced reward sensitivity in their speed and accuracy, consistent in our model with higher noise-control costs. Including a cost of control over noise explains how reward may allow apparent performance limits to be surpassed. On this view, the pattern of reduced reward sensitivity in PD patients can specifically be accounted for by a higher cost for controlling noise. Copyright © 2015 The Authors. Published by Elsevier Ltd.. All rights reserved.

  18. Reduction potential, shadow prices, and pollution costs of agricultural pollutants in China.

    Science.gov (United States)

    Tang, Kai; Gong, Chengzhu; Wang, Dong

    2016-01-15

    This paper analyses the reduction potential, shadow prices, and pollution costs of agricultural pollutants in China based on provincial panel data for 2001-2010. Using a parameterized quadratic form for the directional output distance function, we find that if agricultural sectors in all provinces were to produce on the production frontier, China could potentially reduce agricultural emissions of chemical oxygen demand (COD), total nitrogen (TN), and total phosphorus (TP) by 16.0%, 16.2%, and 20.4%, respectively. Additionally, our results show that the shadow price of TN increased rapidly and continuously, while that of COD and TP fluctuated for the whole period. For the whole country, the average shadow price of COD, TN, and TP are 8266 Yuan/tonne, 25,560 Yuan/tonne, and 10,160 Yuan/tonne, respectively. The regional shadow prices of agricultural pollutants are unbalanced. Furthermore, we show that the pollution costs from emissions of COD, TN, and TP are 6.09% of the annual gross output value of the agricultural sector and are highest in the Western and lowest in the Eastern provinces. Our estimates suggest that there is scope for further pollution abatement and simultaneous output expansion for China's agriculture if farmers promote greater efficiency in their production process. Policymakers are required to dynamically adjust the pollution tax rates and ascertain the initial permit price in an emission trading system. Policymakers should also consider the different pollution costs for each province when making the reduction allocations within the agricultural sector. Copyright © 2015 Elsevier B.V. All rights reserved.

  19. Design of cost-effective M 25 grade of self compacting concrete

    International Nuclear Information System (INIS)

    Guru Jawahar, J.; Sashidhar, C.; Ramana Reddy, I.V.; Annie Peter, J.

    2013-01-01

    Highlights: ► Design of cost-effective M 25 grade of self compacting concrete is done. ► Mechanical properties of SCC compared with M 25 grade of conventional concrete. ► Effect of class F fly ash is studied on the SCC mechanical properties. ► Cost analysis is done between M 25 grade of CC and SCC. ► Recommendation of M 25 grade of SCC for normal building constructions. - Abstract: This investigation is mainly focused on the development of cost-effective normal strength M 25 grade of self compacting concrete (SCC) for the use of normal building constructions. Keeping in view of the normal strength, cost, quality and durability of SCC and greenhouse gas emissions, a combination type of SCC was developed with 35% replacement of cement with class F fly ash. This study recommended a SCC mix with moderate fines to obtain a cost-effective normal strength SCC for the normal building constructions. Studies also revealed that further reduction in fines content in SCC with the same replacement level of fly ash decreased the SCC strength and its performance. Cost analysis has been done between M 25 grade of SCC and conventional concrete (CC). Results shown that the SCC material cost is slightly higher than that of CC of the same strength class, but the savings in labour cost and construction time and quality of SCC would offset the SCC material cost and reduce the total life cycle cost of SCC

  20. Development of a module for Cost-Benefit analysis of risk reduction measures for natural hazards for the CHANGES-SDSS platform

    Science.gov (United States)

    Berlin, Julian; Bogaard, Thom; Van Westen, Cees; Bakker, Wim; Mostert, Eric; Dopheide, Emile

    2014-05-01

    Cost benefit analysis (CBA) is a well know method used widely for the assessment of investments either in the private and public sector. In the context of risk mitigation and the evaluation of risk reduction alternatives for natural hazards its use is very important to evaluate the effectiveness of such efforts in terms of avoided monetary losses. However the current method has some disadvantages related to the spatial distribution of the costs and benefits, the geographical distribution of the avoided damage and losses, the variation in areas that are benefited in terms of invested money and avoided monetary risk. Decision-makers are often interested in how the costs and benefits are distributed among different administrative units of a large area or region, so they will be able to compare and analyse the cost and benefits per administrative unit as a result of the implementation of the risk reduction projects. In this work we first examined the Cost benefit procedure for natural hazards, how the costs are assessed for several structural and non-structural risk reduction alternatives, we also examined the current problems of the method such as the inclusion of cultural and social considerations that are complex to monetize , the problem of discounting future values using a defined interest rate and the spatial distribution of cost and benefits. We also examined the additional benefits and the indirect costs associated with the implementation of the risk reduction alternatives such as the cost of having a ugly landscape (also called negative benefits). In the last part we examined the current tools and software used in natural hazards assessment with support to conduct CBA and we propose design considerations for the implementation of the CBA module for the CHANGES-SDSS Platform an initiative of the ongoing 7th Framework Programme "CHANGES of the European commission. Keywords: Risk management, Economics of risk mitigation, EU Flood Directive, resilience, prevention

  1. Low-cost optical fabrication of flexible copper electrode via laser-induced reductive sintering and adhesive transfer

    Science.gov (United States)

    Back, Seunghyun; Kang, Bongchul

    2018-02-01

    Fabricating copper electrodes on heat-sensitive polymer films in air is highly challenging owing to the need of expensive copper nanoparticles, rapid oxidation of precursor during sintering, and limitation of sintering temperature to prevent the thermal damage of the polymer film. A laser-induced hybrid process of reductive sintering and adhesive transfer is demonstrated to cost-effectively fabricate copper electrode on a polyethylene film with a thermal resistance below 100 °C. A laser-induced reductive sintering process directly fabricates a high-conductive copper electrode onto a glass donor from copper oxide nanoparticle solution via photo-thermochemical reduction and agglomeration of copper oxide nanoparticles. The sintered copper patterns were transferred in parallel to a heat-sensitive polyethylene film through self-selective surface adhesion of the film, which was generated by the selective laser absorption of the copper pattern. The method reported here could become one of the most important manufacturing technologies for fabricating low-cost wearable and disposable electronics.

  2. Construction of low-cost, Mod-OA wood composite wind turbine blades

    Science.gov (United States)

    Lark, R. F.

    1983-01-01

    Two sixty-foot, low-cost, wood composite blades for service on 200 kW Mod-OA wind turbines were constructed. The blades were constructed of epoxy resin-bonded Douglas fir veneers for the leading edge sections, and paper honeycombcored, birch plywood faced panels for the afterbody sections. The blades were joined to the wind turbine hub by epoxy resin-bonded steel load take-off studs embedded into the root end of the blades. The blades were installed on the 200 kW Mod-OA wind turbine facility at Kahuku, Hawaii, The blades completed nearly 8,000 hours of operation over an 18 month period at an average power of 150 kW prior to replacement with another set of wood composite blades. The blades were replaced because of a corrosion failure of the steel shank on one stud. Inspections showed that the wood composite structure remained in excellent condition.

  3. Weight and cost analysis of large wind turbine rotors constructed from conventional materials and from advanced composite materials

    Energy Technology Data Exchange (ETDEWEB)

    van Holten, Th

    1982-07-01

    Cost calculations and cost analyses of the blades and the (teetering) hubs of large wind turbines. The blades are of different shapes, construction and materials (aluminium, steel and glass reinforced plastics). Teetering hubs are heavy and complicated steel constructions, necessary to minimize material fatigue. In large wind turbines with a diameter of 60 to 100 m or even more the rotor mass (hubs and blades together) may vary from 46,000 to 216,000 kg. Costs are estimated to be DFL. 16/kg, both for teetering hubs and/or blades made of glass reinforced plastics. Due to lack of experience and of exact knowledge of the loads appearing during operation under field conditions the uncertainty factor may be 10% to 15%.

  4. On information and communication technology and production cost in construction industry: evidence from the Netherlands

    NARCIS (Netherlands)

    van der Vlist, A.J; Vrolijk, M.H.; Dewulf, Geert P.M.R.

    2014-01-01

    The interplay between information and communication technology (ICT) and the competitiveness of construction firms is considered. More specifically, the question is whether firms that invest in information and communication technology have a production cost advantage. The economics literature

  5. Design, construction, and operation of the contact size reduction facility at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Frank, D.E.; Reeves, S.R.; Valenti, P.J.

    1988-05-01

    This paper describes the design, construction and initial operation of the Contact-Handled Size Reduction Facility (CSRF) at the West Valley Demonstration Project. The facility was constructed to size reduce contaminated tanks, piping, and other metallic scrap and package the scrap for disposal. In addition, the CSRF has the capability to decontaminate scrap prior to disposal. The anticipated result of decontaminating the scrap is to reduce waste classified as transuranic or low-level Class B and C to Class A or release for unrestricted use as nonradioactive equipment. 10 figs., 1 tab

  6. Comparison of cost effectiveness of risk reduction among different energy systems: French case studies. Final report of the co-ordinated research programme

    Energy Technology Data Exchange (ETDEWEB)

    Lochard, Jacques [ed.

    1989-08-01

    This report presents the three French case studies performed in the framework of the coordinated research program on 'Comparison of Cost-effectiveness of Risk Reduction among different Energy Systems': Cost effectiveness of robotics and remote tooling for occupational risk reduction at a nuclear fuel fabrication facility; Cost-effectiveness of protection actions to reduce occupational exposures in underground uranium mines; Cost-effectiveness of safety measures to reduce public risk associated with the transportation of UF{sub 6} by truck and trains.

  7. Modelled Cost-Effectiveness of a Package Size Cap and a Kilojoule Reduction Intervention to Reduce Energy Intake from Sugar-Sweetened Beverages in Australia

    Science.gov (United States)

    Mantilla Herrera, Ana Maria; Neal, Bruce; Zheng, Miaobing; Lal, Anita; Sacks, Gary

    2017-01-01

    Interventions targeting portion size and energy density of food and beverage products have been identified as a promising approach for obesity prevention. This study modelled the potential cost-effectiveness of: a package size cap on single-serve sugar sweetened beverages (SSBs) >375 mL (package size cap), and product reformulation to reduce energy content of packaged SSBs (energy reduction). The cost-effectiveness of each intervention was modelled for the 2010 Australia population using a multi-state life table Markov model with a lifetime time horizon. Long-term health outcomes were modelled from calculated changes in body mass index to their impact on Health-Adjusted Life Years (HALYs). Intervention costs were estimated from a limited societal perspective. Cost and health outcomes were discounted at 3%. Total intervention costs estimated in AUD 2010 were AUD 210 million. Both interventions resulted in reduced mean body weight (package size cap: 0.12 kg; energy reduction: 0.23 kg); and HALYs gained (package size cap: 73,883; energy reduction: 144,621). Cost offsets were estimated at AUD 750.8 million (package size cap) and AUD 1.4 billion (energy reduction). Cost-effectiveness analyses showed that both interventions were “dominant”, and likely to result in long term cost savings and health benefits. A package size cap and kJ reduction of SSBs are likely to offer excellent “value for money” as obesity prevention measures in Australia. PMID:28878175

  8. Sustainable cost reduction by lean management in metallurgical processes

    Directory of Open Access Journals (Sweden)

    A. V. Todorut

    2016-10-01

    Full Text Available This paper focuses on the need for sustainable cost reduction in the metallurgical industry by applying Lean Management (LM tools and concepts in metallurgical production processes leading to increased competitiveness of corporations in a global market. The paper highlights that Lean Management is a novel way of thinking, adapting to change, reducing waste and continuous improvement, leading to sustainable development of companies in the metallurgical industry. The authors outline the main Lean Management instruments based on recent scientific research and include a comparative analysis of other tools, such as Sort, Straighten, Shine, Standardize, Sustain (5S, Visual Management (VM, Kaizen, Total Productive Maintenance (TPM, Single-Minute Exchange of Dies (SMED, leading to a critical appraisal of their application in the metallurgical industry.

  9. Construction mathematics

    CERN Document Server

    Virdi, Surinder; Virdi, Narinder Kaur

    2014-01-01

    Construction Mathematics is an introductory level mathematics text, written specifically for students of construction and related disciplines. Learn by tackling exercises based on real-life construction maths. Examples include: costing calculations, labour costs, cost of materials and setting out of building components. Suitable for beginners and easy to follow throughout. Learn the essential basic theory along with the practical necessities. The second edition of this popular textbook is fully updated to match new curricula, and expanded to include even more learning exercises. End of chapter exercises cover a range of theoretical as well as practical problems commonly found in construction practice, and three detailed assignments based on practical tasks give students the opportunity to apply all the knowledge they have gained. Construction Mathematics addresses all the mathematical requirements of Level 2 construction NVQs from City & Guilds/CITB and Edexcel courses, including the BTEC First Diploma in...

  10. A Conceptual Cost Benefit Analysis of Tailings Matrices Use in Construction Applications

    OpenAIRE

    Mahmood Ali A.; Elektorowicz Maria

    2016-01-01

    As part of a comprehensive research program, new tailings matrices are formulated of combinations of tailings and binder materials. The research program encompasses experimental and numerical analysis of the tailings matrices to investigate the feasibility of using them as construction materials in cold climates. This paper discusses a conceptual cost benefit analysis for the use of these new materials. It is shown here that the financial benefits of using the proposed new tailings matrices i...

  11. How Expensive Is Expensive Enough? Opportunities for Cost Reductions in Offshore Wind Energy Logistics

    DEFF Research Database (Denmark)

    Poulsen, Thomas; Hasager, Charlotte Bay

    2016-01-01

    This paper reveals that logistics may conservatively amount to 18% of the levelized cost of energy for offshore wind farms. This is the key finding from an extensive case study carried out within the organization of the world’s leading offshore wind farm developer and operator. The case study aimed...... to, and produced, a number of possible opportunities for offshore wind cost reductions through logistics innovation; however, within the case study company, no company-wide logistics organization existed to focus horizontally on reducing logistics costs in general. Logistics was not well defined...... within the case study company, and a logistics strategy did not exist. With full life-cycle costs of offshore wind farms still high enough to present a political challenge within the European Union in terms of legislation to ensure offshore wind diffusion beyond 2020, our research presents logistics...

  12. A cost effectiveness analysis of salt reduction policies to reduce coronary heart disease in four Eastern Mediterranean countries.

    Directory of Open Access Journals (Sweden)

    Helen Mason

    Full Text Available BACKGROUND: Coronary Heart Disease (CHD is rising in middle income countries. Population based strategies to reduce specific CHD risk factors have an important role to play in reducing overall CHD mortality. Reducing dietary salt consumption is a potentially cost-effective way to reduce CHD events. This paper presents an economic evaluation of population based salt reduction policies in Tunisia, Syria, Palestine and Turkey. METHODS AND FINDINGS: Three policies to reduce dietary salt intake were evaluated: a health promotion campaign, labelling of food packaging and mandatory reformulation of salt content in processed food. These were evaluated separately and in combination. Estimates of the effectiveness of salt reduction on blood pressure were based on a literature review. The reduction in mortality was estimated using the IMPACT CHD model specific to that country. Cumulative population health effects were quantified as life years gained (LYG over a 10 year time frame. The costs of each policy were estimated using evidence from comparable policies and expert opinion including public sector costs and costs to the food industry. Health care costs associated with CHDs were estimated using standardized unit costs. The total cost of implementing each policy was compared against the current baseline (no policy. All costs were calculated using 2010 PPP exchange rates. In all four countries most policies were cost saving compared with the baseline. The combination of all three policies (reducing salt consumption by 30% resulted in estimated cost savings of $235,000,000 and 6455 LYG in Tunisia; $39,000,000 and 31674 LYG in Syria; $6,000,000 and 2682 LYG in Palestine and $1,3000,000,000 and 378439 LYG in Turkey. CONCLUSION: Decreasing dietary salt intake will reduce coronary heart disease deaths in the four countries. A comprehensive strategy of health education and food industry actions to label and reduce salt content would save both money and lives.

  13. Construction and Characterization of a Compact, Portable, Low-Cost Colorimeter for the Chemistry Lab

    Science.gov (United States)

    Clippard, Carrie M.; Hughes, William; Chohan, Balwant S.; Sykes, Danny G.

    2016-01-01

    A low-cost and portable colorimeter was constructed featuring a low-voltage programmable color light sensor-to-frequency converter, a CMOS 8-bit microcontroller, and an LCD display. The instrument has successfully facilitated the introduction and application of spectroscopy to groups of middle school, high school, and undergraduate students. A…

  14. Estimate of the benefits of a population-based reduction in dietary sodium additives on hypertension and its related health care costs in Canada.

    Science.gov (United States)

    Joffres, Michel R; Campbell, Norm R C; Manns, Braden; Tu, Karen

    2007-05-01

    Hypertension is the leading risk factor for mortality worldwide. One-quarter of the adult Canadian population has hypertension, and more than 90% of the population is estimated to develop hypertension if they live an average lifespan. Reductions in dietary sodium additives significantly lower systolic and diastolic blood pressure, and population reductions in dietary sodium are recommended by major scientific and public health organizations. To estimate the reduction in hypertension prevalence and specific hypertension management cost savings associated with a population-wide reduction in dietary sodium additives. Based on data from clinical trials, reducing dietary sodium additives by 1840 mg/day would result in a decrease of 5.06 mmHg (systolic) and 2.7 mmHg (diastolic) blood pressures. Using Canadian Heart Health Survey data, the resulting reduction in hypertension was estimated. Costs of laboratory testing and physician visits were based on 2001 to 2003 Ontario Health Insurance Plan data, and the number of physician visits and costs of medications for patients with hypertension were taken from 2003 IMS Canada. To estimate the reduction in total physician visits and laboratory costs, current estimates of aware hypertensive patients in Canada were used from the Canadian Community Health Survey. Reducing dietary sodium additives may decrease hypertension prevalence by 30%, resulting in one million fewer hypertensive patients in Canada, and almost double the treatment and control rate. Direct cost savings related to fewer physician visits, laboratory tests and lower medication use are estimated to be approximately $430 million per year. Physician visits and laboratory costs would decrease by 6.5%, and 23% fewer treated hypertensive patients would require medications for control of blood pressure. Based on these estimates, lowering dietary sodium additives would lead to a large reduction in hypertension prevalence and result in health care cost savings in Canada.

  15. Water reduction by constructed wetlands treating waste landfill leachate in a tropical region.

    Science.gov (United States)

    Ogata, Yuka; Ishigaki, Tomonori; Ebie, Yoshitaka; Sutthasil, Noppharit; Chiemchaisri, Chart; Yamada, Masato

    2015-10-01

    One of the key challenges in landfill leachate management is the prevention of environmental pollution by the overflow of untreated leachate. To evaluate the feasibility of constructed wetlands (CWs) for the treatment of waste landfill leachate in tropical regions, water reduction and pollutant removal by a CW subjected to different flow patterns (i.e., horizontal subsurface flow (HSSF) and free water surface (FWS)) were examined in both rainy and dry seasons in Thailand. A pilot-scale CW planted with cattail was installed at a landfill site in Thailand. With HSSF, the CW substantially removed pollutants from the landfill leachate without the need to harvest plants, whereas with FWS, it only slightly removed pollutants. Under both flow patterns, the CW significantly reduced the leachate volume to a greater extent than surface evaporation, which is regarded as an effect of the storage pond. Additionally, water reduction occurred regardless of season and precipitation, within the range 0-9 mm d(-1). In the case of low feeding frequency, water reduction by the CW with HSSF was lower than that with FWS. However, high feeding frequency improved water reduction by the CW with HSSF and resulted in a similar reduction to that observed with FWS, which exhibited maximum evapotranspiration. In terms of water reduction, with both HSSF in conjunction with high frequency feeding and FWS, the CW provided a high degree of evapotranspiration. However, pollutant removal efficiencies with HSSF were higher than for FWS. The present study suggested that CWs with HSSF and high frequency feeding could be useful for the prevention of uncontrollable dispersion of polluted leachate in the tropical climate zone. Copyright © 2015 Elsevier Ltd. All rights reserved.

  16. The Role of E-Procurement in the Austrian Construction Industry: Adoption Rate, Benefits and Barriers

    NARCIS (Netherlands)

    Zunk, Bernd Markus; Marchner, Martin; Uitz, Iris; Lerch, Carina; Schiele, Holger

    2014-01-01

    The progressive developments force suppliers on efficiency-driven construction markets to reorganize their internal organization. Especially the complex and not standardized procurement process holds high cost reduction potential. To exploit this potential, suppliers need to understand the

  17. Integrated construction management technology for power plants

    International Nuclear Information System (INIS)

    Okada, Hisako; Miura, Jun; Nishitani, Yasuhiko

    2003-01-01

    The improvement and rationalization of the plant construction technology has been promoted in order to shorten the construction period, to improve the quality and reliability, and especially to reduce construction costs. With the recent remarkable advances of computer technology, it is necessary to introduce an electronic information technology (IT) into the construction field, and to develop a business process. In such a situation, Hitachi has developed and applied integrated construction support system, which is consistent among design, production and construction. This system has design information and schedule information made electronically as a basic database, and characterizes with project management function based on that information. By introduction of this system, electronic processing of information and reduction of paperwork has enabled high efficiency and standardization of on-site indirect work. Furthermore, by collaboration with the civil company, electrical data exchange has been carried out and developed techniques to improve the interface between mechanical and civil work. High accuracy of construction planning and unification of schedule data have been achieved, and consequently, rework and adjustment at the job site have been greatly reduced. (author)

  18. In the field of energy cost reduction, what is the potential?; En matiere de reduction des depenses d`energie: quel est le gisement?

    Energy Technology Data Exchange (ETDEWEB)

    Millet, B. [Departement Industrie, CEREN (France)

    1996-12-31

    Through a segmentation of the fuel and electric power consumptions in the various industrial sectors and energy consumption process types in France in 1990, the energy conservation potential in the French metalworking and mechanical industry is analyzed and its evolution up to 2005 is assessed. It is shown that the reduction potential amounts to 450 kTep or 20 percent of the metalworking and metallic construction industry energy consumption, with an important part for the out-of-process sector (space heating, compressed air production, lighting). In the process sector, important reductions could be realized in thermal treatments and metal heating prior forming

  19. Summary of nuclear power plant construction

    International Nuclear Information System (INIS)

    Tamura, Saburo

    1973-01-01

    Various conditions for the construction of nuclear power plants in Japan without natural resources were investigated. Expansion of the sites of plants, change of reactor vessels, standardization of nuclear power plants, possiblity of the reduction of construction period, approaching of nuclear power plants to consuming cities, and group construction were studied. Evaluation points were safety and economy. Previous sites of nuclear power plants were mostly on plane ground or cut and enlarge sites. Proposals for underground or offshore plants have been made. The underground plants were made at several places in Europe, and the ocean plant is now approved in U.S.A. as a plant on a man-made island. Vessels for containing nuclear reactors are the last barriers to the leakage of radioactive substance. At the initial period, the vessels were made of steel, which were surrounded by shielding material. Those were dry well type containers. Then, vessel type changed to pressure-suppression type wet containers. Now, it tends to concrete (PC or RC) type containers. There is the policy on the standardization of nuclear power plants by U.S.A.E.C. in recent remarkable activity. The merit and effect of the standardization were studied, and are presented in this paper. Cost of the construction of nuclear power plants is expensive, and interest of money is large. Then, the reduction of construction period is an important problem. The situations of plants approaching to consuming cities in various countries were studied. Idea of group construction is described. (Kato, T.)

  20. Uranium Mill Tailings Remedial Action Project: Cost Reduction and Productivity Improvement Program Project Plan

    International Nuclear Information System (INIS)

    1991-11-01

    The purpose of the Cost Reduction/Productivity Improvement Program Plan is to formalize and improve upon existing efforts to control costs which have been underway since project inception. This program plan has been coordinated with the Department of Energy (DOE) Office of Environmental Management (EM) and the DOE Field Office, Albuquerque (AL). It incorporates prior Uranium Mill Tallings Remedial Action (UMTRA) Project Office guidance issued on the subject. The opportunities for reducing cosh and improving productivity are endless. The CR/PIP has these primary objectives: Improve productivity and quality; heighten the general cost consciousness of project participants, at all levels of their organizations; identify and implement specific innovative employee ideas that extend beyond what is required through existing processes and procedures; emphasize efforts that create additional value for the money spent by maintaining the project Total Estimated Cost (TEC) at the lowest possible level

  1. Review of Constructed Subsurface Flow vs. Surface Flow Wetlands

    International Nuclear Information System (INIS)

    HALVERSON, NANCY

    2004-01-01

    The purpose of this document is to use existing documentation to review the effectiveness of subsurface flow and surface flow constructed wetlands in treating wastewater and to demonstrate the viability of treating effluent from Savannah River Site outfalls H-02 and H-04 with a subsurface flow constructed wetland to lower copper, lead and zinc concentrations to within National Pollutant Discharge Elimination System (NPDES) Permit limits. Constructed treatment wetlands are engineered systems that have been designed and constructed to use the natural functions of wetlands for wastewater treatment. Constructed wetlands have significantly lower total lifetime costs and often lower capital costs than conventional treatment systems. The two main types of constructed wetlands are surface flow and subsurface flow. In surface flow constructed wetlands, water flows above ground. Subsurface flow constructed wetlands are designed to keep the water level below the top of the rock or gravel media, thus minimizing human and ecological exposure. Subsurface flow wetlands demonstrate higher rates of contaminant removal per unit of land than surface flow (free water surface) wetlands, therefore subsurface flow wetlands can be smaller while achieving the same level of contaminant removal. Wetlands remove metals using a variety of processes including filtration of solids, sorption onto organic matter, oxidation and hydrolysis, formation of carbonates, formation of insoluble sulfides, binding to iron and manganese oxides, reduction to immobile forms by bacterial activity, and uptake by plants and bacteria. Metal removal rates in both subsurface flow and surface flow wetlands can be high, but can vary greatly depending upon the influent concentrations and the mass loading rate. Removal rates of greater than 90 per cent for copper, lead and zinc have been demonstrated in operating surface flow and subsurface flow wetlands. The constituents that exceed NPDES limits at outfalls H-02 a nd H

  2. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    Science.gov (United States)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average

  3. A single-vendor and a single-buyer integrated inventory model with ordering cost reduction dependent on lead time

    Science.gov (United States)

    Vijayashree, M.; Uthayakumar, R.

    2017-09-01

    Lead time is one of the major limits that affect planning at every stage of the supply chain system. In this paper, we study a continuous review inventory model. This paper investigates the ordering cost reductions are dependent on lead time. This study addressed two-echelon supply chain problem consisting of a single vendor and a single buyer. The main contribution of this study is that the integrated total cost of the single vendor and the single buyer integrated system is analyzed by adopting two different (linear and logarithmic) types ordering cost reductions act dependent on lead time. In both cases, we develop effective solution procedures for finding the optimal solution and then illustrative numerical examples are given to illustrate the results. The solution procedure is to determine the optimal solutions of order quantity, ordering cost, lead time and the number of deliveries from the single vendor and the single buyer in one production run, so that the integrated total cost incurred has the minimum value. Ordering cost reduction is the main aspect of the proposed model. A numerical example is given to validate the model. Numerical example solved by using Matlab software. The mathematical model is solved analytically by minimizing the integrated total cost. Furthermore, the sensitivity analysis is included and the numerical examples are given to illustrate the results. The results obtained in this paper are illustrated with the help of numerical examples. The sensitivity of the proposed model has been checked with respect to the various major parameters of the system. Results reveal that the proposed integrated inventory model is more applicable for the supply chain manufacturing system. For each case, an algorithm procedure of finding the optimal solution is developed. Finally, the graphical representation is presented to illustrate the proposed model and also include the computer flowchart in each model.

  4. Residential, Commercial, and Utility-Scale Photovoltaic (PV) System Prices in the United States: Current Drivers and Cost-Reduction Opportunities

    Energy Technology Data Exchange (ETDEWEB)

    Goodrich, A.; James, T.; Woodhouse, M.

    2012-02-01

    The price of photovoltaic (PV) systems in the United States (i.e., the cost to the system owner) has dropped precipitously in recent years, led by substantial reductions in global PV module prices. However, system cost reductions are not necessarily realized or realized in a timely manner by many customers. Many reasons exist for the apparent disconnects between installation costs, component prices, and system prices; most notable is the impact of fair market value considerations on system prices. To guide policy and research and development strategy decisions, it is necessary to develop a granular perspective on the factors that underlie PV system prices and to eliminate subjective pricing parameters. This report's analysis of the overnight capital costs (cash purchase) paid for PV systems attempts to establish an objective methodology that most closely approximates the book value of PV system assets.

  5. Proceedings of the national seminar on advanced construction techniques and geotechnical engineering

    International Nuclear Information System (INIS)

    Partheeban, P.; Poornima, C.A.; Guru, V.

    2015-02-01

    The objective of this seminar is to emphasize the need for developing modern construction materials in the era of technology. It also provides a forum for National Research Scholars, Construction Specialists and Professionals, Planners, Faculty, PG and UG Students to discuss and evolve solutions for various difficulties faced during construction. Theme of seminar includes Geotechnical site Investigation, Ground improvement Techniques, Soil Dynamics, Geotechnical Earthquake Engineering, Geo- Environmental Engineering, Self Compacting Concrete, Geopolymer Concrete and Concrete Technology, Cost Effective Construction Techniques, Limit state performance state approach Elastic and Elasto-plastic behavior and Reduction of Corrosion in concrete using Chemical admixtures. Paper relevant to INIS are indexed separately

  6. Insourcing as a Stratagy for Cost Reduction: a Methodology to Identifiy and Mensurate the Supporting Decition Factors

    Directory of Open Access Journals (Sweden)

    Geraldo Magela Ribeiro dos Santos

    2015-08-01

    Full Text Available The 2008, market crisis made the national siderurgy industry reconsider its cost structure in order to maintain its competitiveness. Among the adopted strategies, insourcing was used in order to reduce costs and improve its productive capacity from its people and equipments resulting from declining sales. This research has been developed within this context and has as its objective to quantify the results of this choice. In order to achieve this objective, an insourcing case study of mechanical maintenance at ArcelorMittal Tubarão (AMT was used. Among the main advantages of insourcing at AMT are: the reduction of 24, 41% in maintenance services costs; a reduction in the level of rework and the level of lost time injuries (LTI; increased productivity and the index for available time fulfillment on shutdown. The factors that most contributed for the services insourcing are: collective bargaining agreements of the contractors higher than those of contracting and the incidence of profit, management fees (rates administration and taxes on the cost of labor and benefits to employees. This research also concludes that if the service prices of third parties were only adjusted based upon the inflation index (INPC over the last ten years, the insourcing of services, if viewed from the costs standpoint, would have been unfeasible.

  7. Consequent use of IT tools as a driver for cost reduction and quality improvements

    Science.gov (United States)

    Hein, Stefan; Rapp, Roberto; Feustel, Andreas

    2013-10-01

    The semiconductor industry drives a lot of efforts in the field of cost reductions and quality improvements. The consequent use of IT tools is one possibility to support these goals. With the extensions of its 150mm Fab to 200mm Robert Bosch increased the systematic use of data analysis and Advanced Process Control (APC).

  8. Evaluation of selected chemical processes for production of low-cost silicon

    Science.gov (United States)

    Blocher, J. M., Jr.; Browning, M. F.; Wilson, W. J.; Carmichael, D. C.

    1976-01-01

    Plant construction costs and manufacturing costs were estimated for the production of solar-grade silicon by the reduction of silicon tetrachloride in a fluidized bed of seed particles, and several modifications of the iodide process using either thermal decomposition on heated filaments (rods) or hydrogen reduction in a fluidized bed of seed particles. Energy consumption data for the zinc reduction process and each of the iodide process options are given and all appear to be acceptable from the standpoint of energy pay back. Information is presented on the experimental zinc reduction of SiCl4 and electrolytic recovery of zinc from ZnCl2. All of the experimental work performed thus far has supported the initial assumption as to technical feasibility of producing semiconductor silicon by the zinc reduction or iodide processes proposed. The results of a more thorough thermodynamic evaluation of the iodination of silicon oxide/carbon mixtures are presented which explain apparent inconsistencies in an earlier cursory examination of the system.

  9. Marginal cost curves for water footprint reduction in irrigated agriculture: a policy and decision making guide for efficient water use in crop production

    Science.gov (United States)

    Chukalla, Abebe; Krol, Maarten; Hoekstra, Arjen

    2016-04-01

    Reducing water footprints (WF) in irrigated crop production is an essential element in water management, particularly in water-scarce areas. To achieve this, policy and decision making need to be supported with information on marginal cost curves that rank measures to reduce the WF according to their cost-effectiveness and enable the estimation of the cost associated with a certain WF reduction target, e.g. towards a certain reasonable WF benchmark. This paper aims to develop marginal cost curves (MCC) for WF reduction. The AquaCrop model is used to explore the effect of different measures on evapotranspiration and crop yield and thus WF that is used as input in the MCC. Measures relate to three dimensions of management practices: irrigation techniques (furrow, sprinkler, drip and subsurface drip); irrigation strategies (full and deficit irrigation); and mulching practices (no mulching, organic and synthetic mulching). A WF benchmark per crop is calculated as resulting from the best-available production technology. The marginal cost curve is plotted using the ratios of the marginal cost to WF reduction of the measures as ordinate, ranking with marginal costs rise with the increase of the reduction effort. For each measure, the marginal cost to reduce WF is estimated by comparing the associated WF and net present value (NPV) to the reference case (furrow irrigation, full irrigation, no mulching). The NPV for each measure is based on its capital costs, operation and maintenances costs (O&M) and revenues. A range of cases is considered, including: different crops, soil types and different environments. Key words: marginal cost curve, water footprint benchmark, soil water balance, crop growth, AquaCrop

  10. Sustainable construction : towards a strategic approach to construction material management for waste reduction

    NARCIS (Netherlands)

    Abarca Guerrero, L.; Scheublin, F.J.M.; Egmond - de Wilde De Ligny, van E.L.C.; Lambert, A.J.D.

    2008-01-01

    The construction sector plays a key role in shaping and developing the built environment. It also has an undisputed and significant impact on it due to the amounts of materials extracted and produced as waste. The construction industry has emphasized to recycling construction waste (CW), however,

  11. Role of dissimilatory sulfate reduction in wetlands constructed for acid coal mine drainage (AMD) treatment. Master's thesis

    International Nuclear Information System (INIS)

    Taddeo, F.J.

    1991-01-01

    Five constructed wetlands with different organic substrates were exposed to the same quantity/quality of acid mine drainage (AMD). During the 16-month exposure to AMD, all wetlands accumulated S in the forms of organic and reduced inorganic S and Fe in the form of iron sulfides. Iron sulfide and probably most of the organic S(C-bonded S) accumulation were end products of bacterial dissimilatory sulfate reduction. Results of study support the notion that sulfate reduction and accumulation of Fe sulfides contribute to Fe retention in wetlands exposed to AMD. Detailed information is provided

  12. Analysis of Correlations between the Level of Partnering Relations and their Influence on the Time, Cost, Quality and Safety of Implementation of Construction Projects

    Directory of Open Access Journals (Sweden)

    Radziszewska-Zielina Elżbieta

    2014-11-01

    Full Text Available The present paper uses the developed model of the influence of partnering relations on the time, cost, quality and safety of implementation of construction projects. On its basis, a questionnaire has been created and a preliminary survey has been conducted. The paper presents an analysis of correlations between the level of partnering relations in the context of the partnering measures indicated in the model and their influence on the time, cost, quality and safety of implementation of construction projects. The analysis was conducted based on the data collected in 52 construction projects. The values of the Spearman rank correlation coefficient and the Pearson product-moment correlation coefficient have been calculated for the examined relations. The analysis allowed for indicating the measures of partnering whose improvement most often brings benefits with regard to the time, cost, quality and safety of implementation of construction projects. Among the 80 analysed correlations, the ones identified as strong were: 15 relations connected with the time, 8 with the cost, 5 with the quality and 1 with the safety of implementation of construction projects.

  13. UWB Wind Turbine Blade Deflection Sensing for Wind Energy Cost Reduction

    DEFF Research Database (Denmark)

    Zhang, Shuai; Jensen, Tobias Lindstrøm; Franek, Ondrej

    2015-01-01

    A new application of utilizing ultra-wideband (UWB) technology to sense wind turbine blade deflections is introduced in this paper for wind energy cost reduction. The lower UWB band of 3.1–5.3 GHz is applied. On each blade, there will be one UWB blade deflection sensing system, which consists...... is always of sufficient quality for accurate estimations under different deflections. The measured results reveal that the blade tip-root distance and blade deflection can be accurately estimated in the complicated and lossy wireless channels around a wind turbine blade. Some future research topics...

  14. Coordinating a Supply Chain When Manufacturer Makes Cost Reduction Investment in Supplier

    Directory of Open Access Journals (Sweden)

    Shilei Huang

    2016-01-01

    Full Text Available We consider a supply chain consisting of an upstream supplier and a downstream manufacturer, in which the supplier provides a component to the manufacturer, facing a price-sensitive and uncertain demand. The manufacturer makes cost reduction investment in the supplier to improve the supplier’s production efficiency, which benefits the entire supply chain. We derive the optimal investment and operating decisions. Both the centralized and decentralized supply chains are studied. We show that the optimal investment and operating decisions in the decentralized setting may deviate from that in the centralized setting. To avoid the profit loss caused by such a deviation, we develop a coordination mechanism by introducing a combined policy of revenue-sharing policy and investment cost-sharing policy. We also show that the developed coordination mechanism can achieve Pareto improvement for the two players.

  15. Compendium of cost-effectiveness evaluations of modifications for dose reduction at nuclear power plants

    International Nuclear Information System (INIS)

    Baum, J.W.; Matthews, G.R.

    1985-12-01

    This report summarizes available information on cost effectiveness of engineering modifications potentially valuable for dose reduction at nuclear power plants. Data were gathered from several US utilities, published literature, equipment and service suppliers, and recent technical meetings. Five simplified econometric models were employed to evaluate data and arrive at a value for cost effectiveness expressed in either (a) dollars/rem, or (b) total dollar savings calculated using a nominal value of $1000/rem. Models employed were: a basic model with no consideration given to the time value of money; two models in which discounting was used to evaluate costs and savings in terms of present values; and two models in which income taxes and revenue requirements were considered. Results from different models varied by as much as a factor of 10, and were generally lowest for the basic model and highest for the before-tax revenue requirements model. Results for 151 evaluations employing different assumptions concerning number of plants per site and outage impacts were tabulated in order of decreasing cost effectiveness. Twenty-five evaluations were identified as exceptionally cost effective since both costs and dose were saved. Forty evaluations indicated highly cost-effective changes based on costs below $1000/rem saved using results of the present-worth model that included discounting of future dose savings

  16. Vehicle Lightweighting: Mass Reduction Spectrum Analysis and Process Cost Modeling

    Energy Technology Data Exchange (ETDEWEB)

    Mascarin, Anthony [IBIS Associates, Inc., Waltham, MA (United States); Hannibal, Ted [IBIS Associates, Inc., Waltham, MA (United States); Raghunathan, Anand [Energetics Inc., Columbia, MD (United States); Ivanic, Ziga [Energetics Inc., Columbia, MD (United States); Clark, Michael [Idaho National Lab. (INL), Idaho Falls, ID (United States)

    2016-03-01

    The U.S. Department of Energy’s Vehicle Technologies Office, Materials area commissioned a study to model and assess manufacturing economics of alternative design and production strategies for a series of lightweight vehicle concepts. In the first two phases of this effort examined combinations of strategies aimed at achieving strategic targets of 40% and a 45% mass reduction relative to a standard North American midsize passenger sedan at an effective cost of $3.42 per pound (lb) saved. These results have been reported in the Idaho National Laboratory report INL/EXT-14-33863 entitled Vehicle Lightweighting: 40% and 45% Weight Savings Analysis: Technical Cost Modeling for Vehicle Lightweighting published in March 2015. The data for these strategies were drawn from many sources, including Lotus Engineering Limited and FEV, Inc. lightweighting studies, U.S. Department of Energy-funded Vehma International of America, Inc./Ford Motor Company Multi-Material Lightweight Prototype Vehicle Demonstration Project, the Aluminum Association Transportation Group, many United States Council for Automotive Research’s/United States Automotive Materials Partnership LLC lightweight materials programs, and IBIS Associates, Inc.’s decades of experience in automotive lightweighting and materials substitution analyses.

  17. Vehicle Lightweighting: Mass Reduction Spectrum Analysis and Process Cost Modeling

    International Nuclear Information System (INIS)

    Mascarin, Anthony; Hannibal, Ted; Raghunathan, Anand; Ivanic, Ziga; Clark, Michael

    2016-01-01

    The U.S. Department of Energy's Vehicle Technologies Office, Materials area commissioned a study to model and assess manufacturing economics of alternative design and production strategies for a series of lightweight vehicle concepts. In the first two phases of this effort examined combinations of strategies aimed at achieving strategic targets of 40% and a 45% mass reduction relative to a standard North American midsize passenger sedan at an effective cost of $3.42 per pound (lb) saved. These results have been reported in the Idaho National Laboratory report INL/EXT-14-33863 entitled Vehicle Lightweighting: 40% and 45% Weight Savings Analysis: Technical Cost Modeling for Vehicle Lightweighting published in March 2015. The data for these strategies were drawn from many sources, including Lotus Engineering Limited and FEV, Inc. lightweighting studies, U.S. Department of Energy-funded Vehma International of America, Inc./Ford Motor Company Multi-Material Lightweight Prototype Vehicle Demonstration Project, the Aluminum Association Transportation Group, many United States Council for Automotive Research's/United States Automotive Materials Partnership LLC lightweight materials programs, and IBIS Associates, Inc.'s decades of experience in automotive lightweighting and materials substitution analyses.

  18. Reduction of wind powered generator cost by use of a one bladed rotor

    Energy Technology Data Exchange (ETDEWEB)

    Pruyn, R R; Wiesner, W; Ljungstroem, O [ed.

    1976-01-01

    Cost analysis supported by preliminary design studies of one and two bladed wind powered generator units shows that a 30% reduction in acquisition cost can be achieved with a one bladed design. Designs studied were sized for an output power of 1000 kilowatts. The one bladed design has the potential for reducing acquisition cost to $680 per available kilowatt if the unit is located in a region with mean surface winds of 15 mph. Vibratory loads of the one bladed design are significant and will require considerable design attention. The one per rev Coriolis torque caused by blade flapping is the most significant problem. The major source of blade flapping will be the velocity gradient of the ground boundary layer. A torsional vibration isolating coupling may be required in the generator drive to reduce the loads due to this vibratory torque. An inclined flapping hinge also is desirable to cause pitch-flap coupling that will suppress blade flap motions.

  19. Does consideration of GHG reductions change local decision making? A Case Study in Chile

    Science.gov (United States)

    Cifuentes, L. A.; Blumel, G.

    2003-12-01

    While local air pollution has been a public concern in developing countries for some time, climate change is looked upon as a non-urgent, developed world problem. In this work we present a case study of the interaction of measures to abate air pollution and measures to mitigate GHG emissions in Santiago, Chile, with the purpose of determining if the consideration of reductions in GHG affects the decisions taken to mitigate local air pollution. The emissions reductions of both GHG and local air pollutants were estimated from emission factors (some derived locally) and changes in activity levels. Health benefits due to air pollution abatement were computed using figures derived previously for the cost benefit analysis of Santiago's Decontamination Plan, transferred to the different cities taking into consideration local demographic and income data. The Santiago estimates were obtained using the damage function approach, based on some local epidemiological studies, and on local health and demographic data. Unit social values for the effects were estimated locally (for cost of treatment and lost productivity values) or extrapolated from US values (mainly for WTP values) using the ratio of per-capita income and an income elasticity of 1. The average benefits of emission abatement (in 1997 US\\ per ton) are 1,800 (1,200-2300) for NOx, 3,000 (2,100-3900) for SO2, 31,900 (21,900 - 41,900) for PM, and 630 (430 - 830) for resuspended dust. Economic benefits due to carbon reduction were considered at 3.5, 10 and 20 UStCO2. Marginal abatement cost curves were constructed considering private and net costs (private less the potential sales of carbon credits) Due to the bottom-up approach to constructing the marginal cost curve, many abatement measures (like congestion tolls and CNG instead of diesel buses) amounting to 8% reduction of PM2.5 concentration, exhibit a negative private cost. If the health benefits are considered for the decision, a maximum reduction of 22% in PM2

  20. An estimate of the cost of burnout on early retirement and reduction in clinical hours of practicing physicians in Canada

    Science.gov (United States)

    2014-01-01

    Background Interest in the impact of burnout on physicians has been growing because of the possible burden this may have on health care systems. The objective of this study is to estimate the cost of burnout on early retirement and reduction in clinical hours of practicing physicians in Canada. Methods Using an economic model, the costs related to early retirement and reduction in clinical hours of physicians were compared for those who were experiencing burnout against a scenario in which they did not experience burnout. The January 2012 Canadian Medical Association Masterfile was used to determine the number of practicing physicians. Transition probabilities were estimated using 2007–2008 Canadian Physician Health Survey and 2007 National Physician Survey data. Adjustments were also applied to outcome estimates based on ratio of actual to planned retirement and reduction in clinical hours. Results The total cost of burnout for all physicians practicing in Canada is estimated to be $213.1 million ($185.2 million due to early retirement and $27.9 million due to reduced clinical hours). Family physicians accounted for 58.8% of the burnout costs, followed by surgeons for 24.6% and other specialists for 16.6%. Conclusion The cost of burnout associated with early retirement and reduction in clinical hours is substantial and a significant proportion of practicing physicians experience symptoms of burnout. As health systems struggle with human resource shortages and expanding waiting times, this estimate sheds light on the extent to which the burden could be potentially decreased through prevention and promotion activities to address burnout among physicians. PMID:24927847

  1. Model reduction by weighted Component Cost Analysis

    Science.gov (United States)

    Kim, Jae H.; Skelton, Robert E.

    1990-01-01

    Component Cost Analysis considers any given system driven by a white noise process as an interconnection of different components, and assigns a metric called 'component cost' to each component. These component costs measure the contribution of each component to a predefined quadratic cost function. A reduced-order model of the given system may be obtained by deleting those components that have the smallest component costs. The theory of Component Cost Analysis is extended to include finite-bandwidth colored noises. The results also apply when actuators have dynamics of their own. Closed-form analytical expressions of component costs are also derived for a mechanical system described by its modal data. This is very useful to compute the modal costs of very high order systems. A numerical example for MINIMAST system is presented.

  2. Dietary fibre intakes and reduction in functional constipation rates among Canadian adults: a cost-of-illness analysis

    Directory of Open Access Journals (Sweden)

    Mohammad M. H. Abdullah

    2015-12-01

    Full Text Available Background: Evidence-based research highlights beneficial impacts of dietary fibre on several aspects of the gut pathophysiology that are accompanied by a considerable financial burden in healthcare services. Recommended intakes of dietary fibre may thus associate with financial benefits at a population level. Objective: We sought to systematically assess the potential annual savings in healthcare costs that would follow the reduction in rates of functional constipation and irregularity with increased dietary fibre intakes among Canadian adults. Design: A cost-of-illness analysis was developed on the basis of current and recommended levels of fibre intake in Canada, constipation reduction per 1 g fibre intake, proportion of adults who are likely to consume fibre-rich diets, and population expected to respond to fibre intake. Sensitivity analyses covering a range of assumptions were further implemented within the economic simulation. Results: Our literature searches assumed a 1.8% reduction in constipation rates with each 1 g/day increase in fibre intake. With intakes corresponding to the Institute of Medicine's adequate levels of 38 g/day for men and 25 g/day for women, among 5 and 100% of the adult populations, anywhere between CAD$1.5 and CAD$31.9 million could be saved on constipation-related healthcare costs annually. Each 1 g/day increase in dietary fibre was estimated to result in total annual healthcare cost savings that ranged between CAD$0.1 and CAD$2.5 million. Conclusions: The present research suggests an economic value of increasing dietary fibre intake beyond its well-known health benefits. Healthy-eating behaviours consistent with the recommended intakes of dietary fibre by the general public should hence be advocated as a practical approach for reducing costs associated with the management of constipation in Canada.

  3. Estimate of the technological costs of CO{sub 2} emission reductions in passenger cars. Emission reduction potentials and their costs; Technikkostenschaetzung fuer die CO{sub 2}-Emissionsminderung bei Pkw. Emissionsminderungspotenziale und ihre Kosten

    Energy Technology Data Exchange (ETDEWEB)

    Herbener, Reinhard; Jahn, Helge; Wetzel, Frank [Umweltbundesamt, Dessau-Rosslau (Germany). Fachgebiet I 3.2 - Schadstoffminderung und Energieeinsparung im Verkehr

    2008-08-06

    The Federal Environmental Office intended to identify the current fuel consumption reduction potential and the cost of efficiency-enhancing measures on passenger cars. For this purpose, an extensive bibliographic search was carried out, and experts from research institutes and from the automobile supplier industry were asked for their opinion. The results are published in table form. (orig.)

  4. Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects

    Directory of Open Access Journals (Sweden)

    D. Mirzai Matin

    2016-08-01

    Full Text Available Water construction projects in Iran frequently face problems which cause cost overrun and time delay, the two most common issues in construction projects in general. The objective of this survey is to identify and quantify these problems and thus help in avoiding them. This survey represents a collection of the most significant problems found in the literature, classified into 11 groups according to their source. The questionnaire form used contains 84 questions which were answered by random engineers who work in water construction projects. The Relative Importance Weight (RIW method is used to weight the importance of each one of the 84 problems. The focus of this survey is on overall top ten issues which are: bureaucracy in bidding method, inflation, economical condition of the government, not enough information gathered and surveys done before design, monthly payment difficulties, material cost changes, law changes by the government, financial difficulties, mode of financing and payment for completed work and changes made by the owner. A section for each of these issues provides additional information about them. In the full text of this survey the same weighting method is used to classify the main groups, and the results show that issues related to the groups of government, owner and consultant has the most significant impact. The last part of this survey describes the point of view of the engineers who took part in this survey and the recommendations they made.

  5. Blood pressure reduction, persistence and costs in the evaluation of antihypertensive drug treatment – a review

    Directory of Open Access Journals (Sweden)

    Hasford Joerg

    2009-03-01

    Full Text Available Abstract Background Blood pressure lowering drugs are usually evaluated in short term trials determining the absolute blood pressure reduction during trough and the duration of the antihypertensive effect after single or multiple dosing. A lack of persistence with treatment has however been shown to be linked to a worse cardiovascular prognosis. This review explores the blood pressure reduction and persistence with treatment of antihypertensive drugs and the cost consequences of poor persistence with pharmaceutical interventions in arterial hypertension. Methods We have searched the literature for data on blood pressure lowering effects of different antihypertensive drug classes and agents, on persistence with treatment, and on related costs. Persistence was measured as patients' medication possession rate. Results are presented in the form of a systematic review. Results Angiotensin II receptor blocker (ARBs have a competitive blood pressure lowering efficacy compared with ACE-inhibitors (ACEi and calcium channel blockers (CCBs, beta-blockers (BBs and diuretics. 8 studies describing the persistence with treatment were identified. Patients were more persistent on ARBs than on ACEi and CCBs, BBs and diuretics. Thus the product of blood pressure lowering and persistence was higher on ARBs than on any other drug class. Although the price per tablet of more recently developed drugs (ACEi, ARBs is higher than that of older ones (diuretics and BBs, the newer drugs result in a more favourable cost to effect ratio when direct drug costs and indirect costs are also considered. Conclusion To evaluate drugs for the treatment of hypertension several key variables including the blood pressure lowering effect, side effects, compliance/persistence with treatment, as well as drug costs and direct and indirect costs of medical care have to be considered. ARBs, while nominally more expensive when drug costs are considered only, provide substantial cost savings

  6. Cost reduction in PV manufacturing. Impact on grid-connected and building-integrated markets

    International Nuclear Information System (INIS)

    Maycock, Paul D.

    1997-01-01

    In the past three years there have been several key events or changes that can lead to fully economic, massive deployment to the grid-connected and central PV markets. The factors discussed in this report include: (1) significant cost reduction in single crystal and polycrystal silicon so that modules profitably priced at $3.10-$3.30 per peak watt and installed grid-connected systems with installed cost of $5.50 per watt are being offered; (2) several new thin film plants - amorphous silicon, cadmium telluride, and copper indium diselenide are being built for 1996, 1997 production with greatly reduced costs; (3) government subsidized volume orders for PV in grid-connected houses (Japan, Germany, Switzerland, Italy, and the United States) provide volume (2000+ units per year) that lead to reduced costs; (4) environmental benefits for PV are being applied in Europe and Japan permitting 'early adopters' to enter the market; and (5) government and commercial acceptance of PV building integrated products, especially in Europe, are expanding PV markets. The combination of these forces lead to the prediction that an 'accelerated' market mode could start in the year 2000

  7. Volume reduction of contaminated filter wastes

    International Nuclear Information System (INIS)

    Buttedahl, O.I.; Terada, K.

    1976-01-01

    Reported are details of a pilot project to design and construct a compactor to reduce the handling of high efficiency particulate air (HEPA) filters used in air filtration systems at facilities where radioactive materials are processed. In such systems at Rocky Flats Plant, filters require frequent change and removal. Large quantities are used and will be increased for future operations. With the completion of the pilot model, it has been demonstrated that volume reductions of more than 80% can be achieved and cost savings will be realized also

  8. A variation reduction allocation model for quality improvement to minimize investment and quality costs by considering suppliers’ learning curve

    Science.gov (United States)

    Rosyidi, C. N.; Jauhari, WA; Suhardi, B.; Hamada, K.

    2016-02-01

    Quality improvement must be performed in a company to maintain its product competitiveness in the market. The goal of such improvement is to increase the customer satisfaction and the profitability of the company. In current practice, a company needs several suppliers to provide the components in assembly process of a final product. Hence quality improvement of the final product must involve the suppliers. In this paper, an optimization model to allocate the variance reduction is developed. Variation reduction is an important term in quality improvement for both manufacturer and suppliers. To improve suppliers’ components quality, the manufacturer must invest an amount of their financial resources in learning process of the suppliers. The objective function of the model is to minimize the total cost consists of investment cost, and quality costs for both internal and external quality costs. The Learning curve will determine how the employee of the suppliers will respond to the learning processes in reducing the variance of the component.

  9. 'EPRI tailored collaboration 2, Crystal River cost and volume reduction program'

    International Nuclear Information System (INIS)

    Genoa, P.H.

    1995-01-01

    During the fall of 1993. Florida Power Corporation joined the EPRI tailored collaboration on the low-level radioactive waste cost and volume reduction. In conjunction with an existing Radwaste Task Force, the EPRI team reviewed past and current waste management practices and developed a prioritized list of opportunities for improvement. In the first quarter of 1994, these opportunities were converted into Action Plans with responsibilities and due dates assigned to support a 60-day refueling outage beginning on April 7, 1994. The Action Plans focussed on: (1) Visible management support in the form of specific plant, department, and worker level radwaste reduction goals. (2) Heightened worker awareness in the form of training (formal and informal), signs, bulletins, and a radwaste awareness video. (3) Material changes from disposable to recyclables, non-incinerables to incinerables, liquid waste processing media replacements and filter use criteria. (4) Work practice changes to reduce valve leaks, reduce contaminated areas, reduce entries to contaminated areas, further segregation of waste streams including 'green is clean' wastes

  10. The costs of reducing the excess CO{sub 2} emissions. Reduction potential and costs in certain sector; Hvad koster det at reducere CO{sup 2}-mankoen? - Reduktionspotentiale og omkostninger i udvalgte sektorer

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2003-07-01

    The report presents the results from the project 'The costs of reducing the excess CO{sub 2} emissions - reduction potential and costs in certain sectors'. The aim of the project has been to elucidate the full extent of the reduction potentials and the costs for certain CO{sub 2} reducing initiatives, which are not included in the present projections of the excess CO{sub 2} emissions. The initiatives included in this report are: Accumulation of methane from Danish disposal facilities; Accumulation of methane from disposal facilities in Russia; Reduction in the use of industrial greenhouse gases; Aquifer disposal of CO{sub 2} in the underground; Offshore CO{sub 2} disposal in oil fields in the North Sea. Furthermore, the report presents a general evaluation of the potential of methane accumulation from wastewater treatment. (ba)

  11. A Conceptual Cost Benefit Analysis of Tailings Matrices Use in Construction Applications

    Directory of Open Access Journals (Sweden)

    Mahmood Ali A.

    2016-01-01

    Full Text Available As part of a comprehensive research program, new tailings matrices are formulated of combinations of tailings and binder materials. The research program encompasses experimental and numerical analysis of the tailings matrices to investigate the feasibility of using them as construction materials in cold climates. This paper discusses a conceptual cost benefit analysis for the use of these new materials. It is shown here that the financial benefits of using the proposed new tailings matrices in terms of environmental sustainability are much higher when compared to normal sand matrices.

  12. Modeling Fuel Treatment Leverage: Encounter Rates, Risk Reduction, and Suppression Cost Impacts

    Directory of Open Access Journals (Sweden)

    Matthew P. Thompson

    2017-11-01

    Full Text Available The primary theme of this study is the cost-effectiveness of fuel treatments at multiple scales of investment. We focused on the nexus of fuel management and suppression response planning, designing spatial fuel treatment strategies to incorporate landscape features that provide control opportunities that are relevant to fire operations. Our analysis explored the frequency and magnitude of fire-treatment encounters, which are critical determinants of treatment efficacy. Additionally, we examined avoided area burned, avoided suppression costs, and avoided damages, and combined all three under the umbrella of leverage to explore multiple dimensions with which to characterize return on investment. We chose the Sierra National Forest, California, USA, as our study site, due to previous work providing relevant data and analytical products, and because it has the potential for large, long-duration fires and corresponding potential for high suppression expenditures. Modeling results generally confirmed that fire-treatment encounters are rare, such that median suppression cost savings are zero, but in extreme years, savings can more than offset upfront investments. Further, reductions in risk can expand areas where moderated suppression response would be appropriate, and these areas can be mapped in relation to fire control opportunities.

  13. Cost reduction in the production process using the ABC and Lean tools: Case Study in the refrigeration components industry

    Directory of Open Access Journals (Sweden)

    Levi da Silva Guimarães

    2015-03-01

    Full Text Available This paper focuses on production management with respect to operating costs that relate directly to the value of the product. For this study, three methods were used, ABC - Activity Based Costing, which provides accurate information about the knowledge of the real costs, VSM - Value Stream Mapping and Lean Manufacturing. The method adopted for this research was the case study. The study was conducted at a refrigeration components company in the Industrial Center of Manaus. The analyses and observations initially went through the process of mapping the value stream, measuring the current state of activities (cycle time, setup, etc.. After analysis it was possible to map the cost for each activity and finally calculate the cost of the product before and after the improvements resulting from the lean methodology. The results obtained in this study showed a 20% reduction in product costs resulting from operational improvements. The activity-based cost led to a discovery of the real costs of waste. The steps for this study include process mapping through the value stream, measuring the current state of activities (cycle time, setup, etc., establishing the cost driver for each activity, and finally calculating the cost of the product before and after the application of lean improvements. The paper was conducted through literature and descriptive review, and used a case study method. It describes the model that has been tested in a production line for a refrigeration components company from the Manaus Industrial Center, achieving a 20% reduction in product cost.

  14. Modular construction approach for advanced nuclear plants

    International Nuclear Information System (INIS)

    Johnson, F.T.; Orr, R.S.; Boudreaux, C.P.

    1988-01-01

    Modular construction has been designated as one of the major features of the AP600 program, a small innovative 600-MW (electric) advanced light water reactor (ALWR) that is currently being developed by Westinghouse and its subcontractors. This program is sponsored by the US Department of Energy (DOE) in conjunction with several other DOE and Electric Power Research Institute ALWR programs. Two major objectives of the AP600 program are as follows: (1) to provide a cost of power competitive with other power generation alternatives; and (2) to provide a short construction schedule that can be met with a high degree of certainty. The AP600 plant addresses these objectives by providing a simplified plant design and an optimized plant arrangement that result in a significant reduction in the number and size of systems and components, minimizes the overall building volumes, and consequently reduces the required bulk quantities. However, only by adopting a modular construction approach for the AP600 can the full cost and schedule benefits be realized from the advances made in the plant systems design and plant arrangement. Modularization is instrumental in achieving both of the above objectives, but most of all, a total modularization approach is considered absolutely essential to ensure that an aggressive construction schedule can be met with a high degree of certainty

  15. A Sensitivity Analysis of Timing and Costs of Greenhouse Gas Emission Reductions

    International Nuclear Information System (INIS)

    Gerlagh, R.; Van der Zwaan, B.

    2004-01-01

    This paper analyses the optimal timing and macro-economic costs of carbon emission reductions that mitigate the global average atmospheric temperature increase. We use a macro-economic model in which there are two competing energy sources, fossil-fuelled and non-fossil-fuelled. Technological change is represented endogenously through learning curves, and niche markets exist implying positive demand for the relatively expensive non-fossil-fuelled energy source. Under these conditions, with a temperature increase constraint of 2C, early abatement is found to be optimal, and, compared to the results of many existing top-down models, the costs of this strategy prove to be low. We perform an extensive sensitivity analysis of our results regarding the uncertainties that dominate various economic and technological modeling parameters. Uncertainties in the learning rate and the elasticity of substitution between the two different energy sources most significantly affect the robustness of our findings

  16. COUNTERBALANCING BENEFITS AND DRAWBACKS OF CONTEMPORARY STABLISED EARTH CONSTRUCTION BY CONSTRUCTION PROFESSIONALS

    Directory of Open Access Journals (Sweden)

    Mohammad Sharif Zami

    2011-07-01

    Full Text Available It is debatable among the construction professionals whether contemporary stabilised earth construction is beneficial in urban low cost housing. Existing literature recorded a lot of benefits and drawbacks from construction professionals, which is empirically substantiated. But there are drawbacks found in the literature that seemingly are conflicting, and construction professionals are divided in their opinion. This paper seeks to address these conflicts and division by validating the controversial drawbacks of contemporary stabilised earth construction in urban low cost housing.

  17. Cost assessment and ecological effectiveness of nutrient reduction options for mitigating Phaeocystis colony blooms in the Southern North Sea: an integrated modeling approach.

    Science.gov (United States)

    Lancelot, Christiane; Thieu, Vincent; Polard, Audrey; Garnier, Josette; Billen, Gilles; Hecq, Walter; Gypens, Nathalie

    2011-05-01

    Nutrient reduction measures have been already taken by wealthier countries to decrease nutrient loads to coastal waters, in most cases however, prior to having properly assessed their ecological effectiveness and their economic costs. In this paper we describe an original integrated impact assessment methodology to estimate the direct cost and the ecological performance of realistic nutrient reduction options to be applied in the Southern North Sea watershed to decrease eutrophication, visible as Phaeocystis blooms and foam deposits on the beaches. The mathematical tool couples the idealized biogeochemical GIS-based model of the river system (SENEQUE-RIVERSTRAHLER) implemented in the Eastern Channel/Southern North Sea watershed to the biogeochemical MIRO model describing Phaeocystis blooms in the marine domain. Model simulations explore how nutrient reduction options regarding diffuse and/or point sources in the watershed would affect the Phaeocystis colony spreading in the coastal area. The reference and prospective simulations are performed for the year 2000 characterized by mean meteorological conditions, and nutrient reduction scenarios include and compare upgrading of wastewater treatment plants and changes in agricultural practices including an idealized shift towards organic farming. A direct cost assessment is performed for each realistic nutrient reduction scenario. Further the reduction obtained for Phaeocystis blooms is assessed by comparison with ecological indicators (bloom magnitude and duration) and the cost for reducing foam events on the beaches is estimated. Uncertainty brought by the added effect of meteorological conditions (rainfall) on coastal eutrophication is discussed. It is concluded that the reduction obtained by implementing realistic environmental measures on the short-term is costly and insufficient to restore well-balanced nutrient conditions in the coastal area while the replacement of conventional agriculture by organic farming

  18. Well construction team approach creates a new future for one company's operations on the Dutch Continental Shelf

    International Nuclear Information System (INIS)

    Bakker, T.W.; Stringer, R.B.

    1995-01-01

    Rising costs and low energy prices were inhibiting the development of marginal fields on the Dutch Continental Shelf, resulting in a reduction in drilling activity and a loss of business opportunities. Independent benchmark surveys and critical analysis of total well costs showed the potential for major cost reductions that could turn many of the smaller offshore gas finds into economic development prospects. This triggered a change from traditional operating and contracting strategies to a partnering approach with the principal drilling and service contractors and the institution of a well-construction team (WCT). The WCT proved so successful, with an average well cost reduction of 21% in the first year, that a similar organization has been set up for all the land drilling and workover operations. This paper describes the strategies used and presents a comparison between the traditional performance and the results from the first year of operating as a WCT. The comparison includes the results of an independent benchmark study of 20 North Sea operating companies

  19. Developing an optimal energy supply strategy for Syria in view of GHG reduction with least-cost climate protection

    International Nuclear Information System (INIS)

    Hainoun, A.; Omar, H.; Almoustafa, A.; Seif Al-din, M.Kh.

    2010-12-01

    This report presents the outcomes of a two years CRP project entitled (Developing an optimal energy supply strategy for Syria in view of GHG reduction with least-cost climate protection). The main activity deals with a case study concerning the assessment of optimal Syrian energy supply strategy taking into account the impact of environmental constraints related to GHG reduction on the cost and prospects of energy sources and technologies with special emphasis on renewable and nuclear options. In a previous activity the future long-term development of Syrian energy and electricity demand has been analyzed according to various scenarios of socio-economic and technological development of the country. The results indicate that energy demand will grow rapidly in the next decades as consequent of many socio-economic and technological factors given by Syria's high population growth, its current economic transition, and its expected economic and technological development, particularly in the industry sector. To meet the projected future energy demand up to 2030, an optimal reference energy supply strategy with minimal supply cost has been developed taking into account, in particular, the availability of national energy resources and diversity of supply options. The analysis has been performed using the IAEA's optimization tool MESSAGE. MESSAGE is suitable to formulate and evaluate alternative energy supply strategies consistent with pre-defined constraints including limits on new investment, fuel availability and trade, environmental regulations, and market penetration rates for new technologies. To evaluate the potential of GHG reduction in the Syrian power sector an alternative energy supply scenario - Mitigation Scenario (Ren S ce) has been introduced reflecting the most probable adaptation measures of this sector to mitigate GHG emission by more dependency on renewable options. Compatible with the Kyoto agreement for developing countries, the CDM is being considered

  20. Low cost and thin metasurface for ultra wide band and wide angle polarization insensitive radar cross section reduction

    Science.gov (United States)

    Ameri, Edris; Esmaeli, Seyed Hassan; Sedighy, Seyed Hassan

    2018-05-01

    A planar low cost and thin metasurface is proposed to achieve ultra-wideband radar cross section (RCS) reduction with stable performance with respect to polarization and incident angles. This metasurface is composed of two different artificial magnetic conductor unit cells arranged in a chessboard like configuration. These unit cells have a Jerusalem cross pattern with different thicknesses, which results in wideband out-phase reflection and RCS reduction, consequently. The designed metasurface reduces RCS more than 10-dB from 13.6 GHz to 45.5 GHz (108% bandwidth) and more than 20-dB RCS from 15.2 GHz to 43.6 GHz (96.6%). Moreover, the 10-dB RCS reduction bandwidth is very stable (more than 107%) for both TE and TM polarizations. The good agreement between simulations and measurement results proves the design, properly. The ultra-wide bandwidth, low cost, low profile, and stable performance of this metasurface prove its high capability compared with the state-of-the-art references.

  1. Cost-Sharing Contracts for Energy Saving and Emissions Reduction of a Supply Chain under the Conditions of Government Subsidies and a Carbon Tax

    Directory of Open Access Journals (Sweden)

    Yi Yuyin

    2018-03-01

    Full Text Available To study the cooperation of upstream and downstream enterprises of a supply chain in energy saving and emissions reduction, we establish a Stackelberg game model. The retailer moves first to decide a cost-sharing contract, then the manufacturer determines the energy-saving level, carbon-emission level, and wholesale price successively. In the end, the retailer determines the retail price. As a regulation, the government provides subsidies for energy-saving products, while imposing a carbon tax on the carbon emitted. The results show that (1 both the energy-saving cost-sharing (ECS and the carbon emissions reduction cost-sharing (CCS contracts are not the dominant strategy of the two parties by which they can facilitate energy savings and emissions reductions; (2 compared with single cost-sharing contracts, the bivariate cost-sharing (BCS contract for energy saving and emissions reduction is superior, although it still cannot realise prefect coordination of the supply chain; (3 government subsidy and carbon tax policies can promote the cooperation of both the upstream and downstream enterprises of the supply chain—a subsidy policy can always drive energy saving and emissions reductions, while a carbon tax policy does not always exert positive effects, as it depends on the initial level of pollution and the level of carbon tax; and (4 the subsidy policy reduces the coordination efficiency of the supply chain, while the influences of carbon tax policy upon the coordination efficiency relies on the initial carbon-emission level.

  2. Improved Cost-Base Design of Water Distribution Networks using Genetic Algorithm

    Science.gov (United States)

    Moradzadeh Azar, Foad; Abghari, Hirad; Taghi Alami, Mohammad; Weijs, Steven

    2010-05-01

    Population growth and progressive extension of urbanization in different places of Iran cause an increasing demand for primary needs. The water, this vital liquid is the most important natural need for human life. Providing this natural need is requires the design and construction of water distribution networks, that incur enormous costs on the country's budget. Any reduction in these costs enable more people from society to access extreme profit least cost. Therefore, investment of Municipal councils need to maximize benefits or minimize expenditures. To achieve this purpose, the engineering design depends on the cost optimization techniques. This paper, presents optimization models based on genetic algorithm(GA) to find out the minimum design cost Mahabad City's (North West, Iran) water distribution network. By designing two models and comparing the resulting costs, the abilities of GA were determined. the GA based model could find optimum pipe diameters to reduce the design costs of network. Results show that the water distribution network design using Genetic Algorithm could lead to reduction of at least 7% in project costs in comparison to the classic model. Keywords: Genetic Algorithm, Optimum Design of Water Distribution Network, Mahabad City, Iran.

  3. 48 CFR 970.5215-4 - Cost reduction.

    Science.gov (United States)

    2010-10-01

    .... Development cost is the Contractor cost of up-front planning, engineering, prototyping, and testing of a... contractual arrangement and the justification for its use; and (ii) A detailed cost/price estimate and...

  4. Reduction in sick leave and costs to society of patients with Meniere's disease after treatment of temporomandibular and cervical spine disorders: a controlled six-year cost-benefit study.

    Science.gov (United States)

    Bjorne, Assar; Agerberg, Göran

    2003-04-01

    This study compares the frequency of sick leave between the three-year period after and the three-year period before coordinated treatment of temporomandibular and cervical spine disorders in 24 patients (ten males and 14 females) diagnosed with Meniere's disease. The frequency of sick leave for the patients was also compared with the frequency of sick leave in a control group from the population. A cost-benefit analysis was made regarding the costs to society of sick leave related to the treatment costs of the patients. In a previous study the same patients were treated for their severe signs and symptoms of temporomandibular and cervical spine disorders, and they reported a substantial reduction in their vertigo, non-whirling dizziness, tinnitus, feeling of fullness in the ear, pain in the face and jaws, pain in the neck and shoulders, and headache. The number of days of sick leave and the year the patient began to receive disability pension due to the symptoms of Meniere's disease were obtained from the National Health Insurance Service in Sweden. Two of the patients received disability pension benefits due to Meniere's disease 17 years prior to their normal retirement pension. A third patient received disability pension for another reason and two were receiving a retirement pension. Data on the remaining 19 patients showed a considerable reduction in number of days of sick leave during the three-year period after coordinated treatment (270 days) compared with the three-year period before the treatment (1,536 days). The control subjects used a total of 14 days sick leave for the same symptoms during the same six-year period. Vertigo (nine days) was the dominant cause followed by pain in the neck and shoulders, and headache. The reduction in sick leave for the 19 nonretired patients and the treatment costs for the 24 patients can be used for a simple cost-benefit calculation for the subgroup of nonretired patients. During the first three years after treatment the

  5. Solar PV Manufacturing Cost Model Group: Installed Solar PV System Prices (Presentation)

    Energy Technology Data Exchange (ETDEWEB)

    Goodrich, A. C.; Woodhouse, M.; James, T.

    2011-02-01

    EERE's Solar Energy Technologies Program is charged with leading the Secretary's SunShot Initiative to reduce the cost of electricity from solar by 75% to be cost competitive with conventional energy sources without subsidy by the end of the decade. As part of this Initiative, the program has funded the National Renewable Energy Laboratory (NREL) to develop module manufacturing and solar PV system installation cost models to ensure that the program's cost reduction targets are carefully aligned with current and near term industry costs. The NREL cost analysis team has leveraged the laboratories' extensive experience in the areas of project finance and deployment, as well as industry partnerships, to develop cost models that mirror the project cost analysis tools used by project managers at leading U.S. installers. The cost models are constructed through a "bottoms-up" assessment of each major cost element, beginning with the system's bill of materials, labor requirements (type and hours) by component, site-specific charges, and soft costs. In addition to the relevant engineering, procurement, and construction costs, the models also consider all relevant costs to an installer, including labor burdens and overhead rates, supply chain costs, and overhead and materials inventory costs, and assume market-specific profits.

  6. Strategies for net cost reductions with the expanded role and expertise of anesthesiologists in the perioperative surgical home.

    Science.gov (United States)

    Dexter, Franklin; Wachtel, Ruth E

    2014-05-01

    The Perioperative Surgical Home is a model adopted by the American Society of Anesthesiologists to increase quality and patient safety and to decrease costs. This Special Article is about the latter topic. Using narrative review, we show that there are two principal opportunities for net cost reduction. One opportunity is to reduce unnecessary interventions that do not have potential to benefit patients (e.g., preoperative laboratory studies in healthy patients undergoing low-risk surgery and use of substantial fresh gas flows with volatile anesthetics). The other opportunity is to optimize staff scheduling, case scheduling, and staff assignment. These two are the same as the principal ways that a positive return on investment can be achieved from use of an anesthesia information management system. Three other opportunities are much less likely to achieve as large (if any) net cost reduction among all patients but may at some hospitals. These are to reduce cancellations, operating room times, and/or hospital postoperative lengths of stay.

  7. Well construction team approach creates a new future for one company's operations on the Dutch Continental Shelf

    International Nuclear Information System (INIS)

    Stringer, R.B.; Bakker, T.W.; Mejnertsen, T.

    1994-01-01

    Rising costs and low energy prices were inhibiting the development of marginal fields on the Dutch Continental Shelf, resulting in a major reduction in drilling activity. This triggered a change from traditional operating and contracting strategies to a Well Construction Team approach based on partnering agreements with the principal drilling and service contractors. The change has resulted in major cost reductions coupled to improved well quality that are justifying the re-evaluation of previously sub-economic development prospects. This paper describes the strategies employed and presents the results achieved during the first year of the partnership

  8. Relationship between degree of risk, cost and level of compliance to occupational health and safety regulations in construction

    Directory of Open Access Journals (Sweden)

    Abimbola Olukemi Windapo

    2013-06-01

    Full Text Available This paper investigates the role of statutory health and safety (H&S regulations in managing construction project risks. The study examines whether the decision made by contractors to comply with the regulations, the cost of compliance and savings of H&S regulatory requirements is influenced by the degree or level of risk, which the regulations are trying to prevent. The rationale for the examination stems from previous studies which establish that building designers and contractors perceive the cost of complying with regulations as additional burdens, which they have to conform to, and which are in some cases unnecessary, and also the fact that construction related injuries and fatalities are on the increase. Qualitative and quantitative data obtained from a descriptive survey and H&S site audit by the Master Builder Association of the Western Cape (MBAWC were used as the measurements of risk, level of compliance to regulations, cost of compliance and savings. By correlating the quantitative and qualitative data, there is empirical evidence to support a negative relationship between the degree of risk, level and cost of compliance and cost savings. Based on the study’s findings, this paper concludes that the decision made by contractors to comply with H&S regulatory requirements is influenced by the perceived cost saving on account of compliance and that cost savings are influenced by the probability of accident occurrence which is an element of the degree of risk which the regulation is trying to prevent or control. 

  9. Relationship between degree of risk, cost and level of compliance to occupational health and safety regulations in construction

    Directory of Open Access Journals (Sweden)

    Abimbola Olukemi Windapo

    2013-06-01

    Full Text Available This paper investigates the role of statutory health and safety (H&S regulations in managing construction project risks. The study examines whether the decision made by contractors to comply with the regulations, the cost of compliance and savings of H&S regulatory requirements is influenced by the degree or level of risk, which the regulations are trying to prevent. The rationale for the examination stems from previous studies which establish that building designers and contractors perceive the cost of complying with regulations as additional burdens, which they have to conform to, and which are in some cases unnecessary, and also the fact that construction related injuries and fatalities are on the increase. Qualitative and quantitative data obtained from a descriptive survey and H&S site audit by the Master Builder Association of the Western Cape (MBAWC were used as the measurements of risk, level of compliance to regulations, cost of compliance and savings. By correlating the quantitative and qualitative data, there is empirical evidence to support a negative relationship between the degree of risk, level and cost of compliance and cost savings. Based on the study’s findings, this paper concludes that the decision made by contractors to comply with H&S regulatory requirements is influenced by the perceived cost saving on account of compliance and that cost savings are influenced by the probability of accident occurrence which is an element of the degree of risk which the regulation is trying to prevent or control.

  10. Costs reduced by innovative plastic distribution pipe use

    International Nuclear Information System (INIS)

    Maxwell, F.W.

    1995-01-01

    As part of a strategic corporate cost-reduction initiative, Pacific Gas and Electric Company's Gas Distribution Group has achieved some quick but significant cash savings. System design, construction, and the purchasing function were areas that produced some fast paybacks while maintaining reliability and safety. The primary savings were made by optimizing pipe specifications to match system operating parameters. This allowed the use of smaller diameter pipes and/or thinner wall pipes which conserved the materials cost of the pipeline. Other realized savings in the form of coiled pipe, purchasing changes, and backfilling specifications are also described

  11. Comparison of cost effectiveness of risk reduction among different energy systems: French case studies. Final report for the period 1 May 1982 - 20 February 1988

    International Nuclear Information System (INIS)

    Lochard, J.

    1989-08-01

    The report presents the three French case studies performed in the framework of the co-ordinated research programme on ''Comparison of Cost-Effectiveness of Risk Reduction Among Different Energy Systems'': cost-effectiveness of robotics and remote tooling for occupational risk reduction at a nuclear fuel fabrication facility; cost-effectiveness of protection actions to reduce occupational exposure in underground uranium mines; cost effectiveness of safety measures to reduce public risk associated with the transportation of UF 6 by truck and trains. Figs and tabs

  12. Construction and Operation Costs of Wastewater Treatment and Implications for the Paper Industry in China.

    Science.gov (United States)

    Niu, Kunyu; Wu, Jian; Yu, Fang; Guo, Jingli

    2016-11-15

    This paper aims to develop a construction and operation cost model of wastewater treatment for the paper industry in China and explores the main factors that determine these costs. Previous models mainly involved factors relating to the treatment scale and efficiency of treatment facilities for deriving the cost function. We considered the factors more comprehensively by adding a regional variable to represent the economic development level, a corporate ownership factor to represent the plant characteristics, a subsector variable to capture pollutant characteristics, and a detailed-classification technology variable. We applied a unique data set from a national pollution source census for the model simulation. The major findings include the following: (1) Wastewater treatment costs in the paper industry are determined by scale, technology, degree of treatment, ownership, and regional factors; (2) Wastewater treatment costs show a large decreasing scale effect; (3) The current level of pollutant discharge fees is far lower than the marginal treatment costs for meeting the wastewater discharge standard. Key implications are as follows: (1) Cost characteristics and impact factors should be fully recognized when planning or making policies relating to wastewater treatment projects or technology development; (2) There is potential to reduce treatment costs by centralizing wastewater treatment via industrial parks; (3) Wastewater discharge fee rates should be increased; (4) Energy efficient technology should become the future focus of wastewater treatment.

  13. Evaluation of potential cost reductions from improved amine-based CO2 capture systems

    International Nuclear Information System (INIS)

    Rao, Anand B.; Rubin, Edward S.; Keith, David W.; Granger Morgan, M.

    2006-01-01

    Technological innovations in CO 2 capture and storage technologies are being pursued worldwide under a variety of private and government-sponsored R and D programs. While much of this R and D is directed at novel concepts and potential breakthrough technologies, there are also substantial efforts to improve CO 2 capture technologies already in use. In this paper, we focus on amine-based CO 2 capture systems for power plants and other combustion-based applications. The current performance and cost of such systems have been documented in several recent studies. In this paper we examine the potential for future cost reductions that may result from continued process development. We used the formal methods of expert elicitation to understand what experts in this field believe about possible improvements in some of the key underlying parameters that govern the performance and cost of this technology. A dozen leading experts from North America, Europe and Asia participated in this study, providing their probabilistic judgments via a detailed questionnaire coupled with individual interviews. Judgments about detailed technical parameters were then used in an integrated power plant modeling framework (IECM-CS) developed for USDOE to evaluate the performance and costs of alternative carbon capture and sequestration technologies for fossil-fueled power plants. The experts' responses have allowed us to build a picture of how the overall performance and cost of amine-based systems might improve over the next decade or two. Results show how much the cost of CO 2 capture could be reduced via targeted R and D in key areas

  14. Estimation of Costs and Durations of Construction of Urban Roads Using ANN and SVM

    Directory of Open Access Journals (Sweden)

    Igor Peško

    2017-01-01

    Full Text Available Offer preparation has always been a specific part of a building process which has significant impact on company business. Due to the fact that income greatly depends on offer’s precision and the balance between planned costs, both direct and overheads, and wished profit, it is necessary to prepare a precise offer within required time and available resources which are always insufficient. The paper presents a research of precision that can be achieved while using artificial intelligence for estimation of cost and duration in construction projects. Both artificial neural networks (ANNs and support vector machines (SVM are analysed and compared. The best SVM has shown higher precision, when estimating costs, with mean absolute percentage error (MAPE of 7.06% compared to the most precise ANNs which has achieved precision of 25.38%. Estimation of works duration has proved to be more difficult. The best MAPEs were 22.77% and 26.26% for SVM and ANN, respectively.

  15. Reduction - competitive tomorrow

    International Nuclear Information System (INIS)

    Worley, L.; Bargerstock, S.

    1995-01-01

    Inventory reduction is one of the few initiatives that represent significant cost-reduction potential that does not result in personnel reduction. Centerior Energy's Perry nuclear power plant has embarked on an aggressive program to reduce inventory while maintaining plant material availability. Material availability to the plant was above 98%, but at an unacceptable 1994 inventory book value of $47 million with inventory carrying costs calculated at 30% annually

  16. Iliac crest autograft versus alternative constructs for anterior cervical spine surgery: Pros, cons, and costs

    Science.gov (United States)

    Epstein, Nancy E.

    2012-01-01

    Background: Grafting choices available for performing anterior cervical diskectomy/fusion (ACDF) procedures have become a major concern for spinal surgeons, and their institutions. The “gold standard”, iliac crest autograft, may still be the best and least expensive grafting option; it deserves to be reassessed along with the pros, cons, and costs for alternative grafts/spacers. Methods: Although single or multilevel ACDF have utilized iliac crest autograft for decades, the implant industry now offers multiple alternative grafting and spacer devices; (allografts, cages, polyether-etherketone (PEEK) amongst others). While most studies have focused on fusion rates and clinical outcomes following ACDF, few have analyzed the “value-added” of these various constructs (e.g. safety/efficacy, risks/complications, costs). Results: The majority of studies document 95%-100% fusion rates when iliac crest autograft is utilized to perform single level ACDF (X-ray or CT confirmed at 6-12 postoperative months). Although many allograft studies similarly quote 90%-100% fusion rates (X-ray alone confirmed at 6-12 postoperative months), a recent “post hoc analysis of data from a prospective multicenter trial” (Riew KD et. al., CSRS Abstract Dec. 2011; unpublished) revealed a much higher delayed fusion rate using allografts at one year 55.7%, 2 years 87%, and four years 92%. Conclusion: Iliac crest autograft utilized for single or multilevel ACDF is associated with the highest fusion, lowest complication rates, and significantly lower costs compared with allograft, cages, PEEK, or other grafts. As spinal surgeons and institutions become more cost conscious, we will have to account for the “value added” of these increasingly expensive graft constructs. PMID:22905321

  17. Renewables vs. energy efficiency: The cost of carbon emissions reduction in Spain

    International Nuclear Information System (INIS)

    López-Peña, Álvaro; Pérez-Arriaga, Ignacio; Linares, Pedro

    2012-01-01

    While support instruments have succeeded to largely deploy renewables during the 1996–2008 period, little attention has been paid to energy efficiency measures, resulting in a high energy intensity and large growth of energy demand. Energy-related CO 2 emissions have increased significantly. At the same time, important investments in combined cycle gas turbines have taken place. This paper analyses whether, from a cost minimization viewpoint, renewable support has been the best policy for reducing emissions, when compared to the promotion of energy efficiency in sectors such as transportation or buildings. We use a model of the Spanish energy sector to examine its evolution in the time period considered under different policies. It is a bottom-up, static, partial equilibrium, linear programming model of the complete Spanish energy system. We conclude that demand side management (DSM) clearly dominates renewable energy (RE) support if the reduction of emissions at minimum cost is the only concern. We also quantify the savings that could have been achieved: a total of €5 billion per year, mainly in RE subsidies and in smaller costs of meeting the reduced demand (net of DSM implementation cost). - Highlights: ► Energy efficiency is cheaper than renewables for reducing carbon emissions. ► Energy efficiency measures could have saved more than €5 billion per year in Spain. ► Savings could have been bigger without overcapacity in gas combined cycles.

  18. Reserves of labour content reduction in NPP construction

    International Nuclear Information System (INIS)

    Bekerman, R.E.

    1986-01-01

    Specific labour contents when constructing NPP with RBMK-1000 and WWER-1000 type reactors are presented. Factors affecting labour content of NPP construction are shown. Measures aimed at labour content decrease are suggested

  19. The health gains and cost savings of dietary salt reduction interventions, with equity and age distributional aspects

    Directory of Open Access Journals (Sweden)

    Nhung Nghiem

    2016-05-01

    Full Text Available Abstract Background A “diet high in sodium” is the second most important dietary risk factor for health loss identified in the Global Burden of Disease Study 2013. We therefore aimed to model health gains and costs (savings of salt reduction interventions related to salt substitution and maximum levels in bread, including by ethnicity and age. We also ranked these four interventions compared to eight other modelled interventions. Methods A Markov macro-simulation model was used to estimate QALYs gained and net health system costs for four dietary sodium reduction interventions, discounted at 3 % per annum. The setting was New Zealand (NZ (2.3 million adults, aged 35+ years which has detailed individual-level administrative cost data. Results The health gain was greatest for an intervention where most (59 % of the sodium in processed foods was replaced by potassium and magnesium salts. This intervention gained 294,000 QALYs over the remaining lifetime of the cohort (95 % UI: 238,000 to 359,000; 0.13 QALY per 35+ year old. Such salt substitution also produced the highest net cost-savings of NZ$ 1.5 billion (US$ 1.0 billion (95 % UI: NZ$ 1.1 to 2.0 billion. All interventions generated relatively larger per capita QALYs for men vs women and for the indigenous Māori population vs non-Māori (e.g., 0.16 vs 0.12 QALYs per adult for the 59 % salt substitution intervention. Of relevance to workforce productivity, in the first 10 years post-intervention, 22 % of the QALY gain was among those aged <65 years (and 37 % for those aged <70. Conclusions The benefits are consistent with the international literature, with large health gains and cost savings possible from some, but not all, sodium reduction interventions. Health gain appears likely to occur among working-age adults and all interventions contributed to reducing health inequalities.

  20. Comparison of cost effectiveness of risk reduction among different energy systems: French case studies. Final report for the period 1 May 1982 - 20 February 1988

    Energy Technology Data Exchange (ETDEWEB)

    Lochard, J [CEPN Centre d` Etude sur l` Evaluation de la Protection dans le Domaine Nucleaire, Fontenay-Aux-Roses (France)

    1989-08-01

    The report presents the three French case studies performed in the framework of the co-ordinated research programme on ``Comparison of Cost-Effectiveness of Risk Reduction Among Different Energy Systems``: cost-effectiveness of robotics and remote tooling for occupational risk reduction at a nuclear fuel fabrication facility; cost-effectiveness of protection actions to reduce occupational exposure in underground uranium mines; cost effectiveness of safety measures to reduce public risk associated with the transportation of UF{sub 6} by truck and trains. Figs and tabs.

  1. Using biomass for climate change mitigation and oil use reduction

    International Nuclear Information System (INIS)

    Gustavsson, L.; Holmberg, J.; Dornburg, V.; Sathre, R.; Eggers, T.; Mahapatra, K.; Marland, G.

    2007-01-01

    In this paper, we examine how an increased use of biomass could efficiently meet Swedish energy policy goals of reducing carbon dioxide (CO 2 ) emissions and oil use. In particular, we examine the trade-offs inherent when biomass use is intended to pursue multiple objectives. We set up four scenarios in which up to 400 PJ/year of additional biomass is prioritised to reduce CO 2 emissions, reduce oil use, simultaneously reduce both CO 2 emission and oil use, or to produce ethanol to replace gasoline. Technologies analysed for using the biomass include the production of electricity, heat, and transport fuels, and also as construction materials and other products. We find that optimising biomass use for a single objective (either CO 2 emission reduction or oil use reduction) results in high fulfilment of that single objective (17.4 Tg C/year and 350 PJ oil/year, respectively), at a monetary cost of 130-330 million Euro /year, but with low fulfilment of the other objective. A careful selection of biomass uses for combined benefits results in reductions of 12.6 Tg C/year and 230 PJ oil/year (72% and 67%, respectively, of the reductions achieved in the scenarios with single objectives), with a monetary benefit of 45 million Euro /year. Prioritising for ethanol production gives the lowest CO 2 emissions reduction, intermediate oil use reduction, and the highest monetary cost

  2. Cost reduction and safety design features of ABWR-II. Annex 5

    International Nuclear Information System (INIS)

    Koh, F.; Moriya, K.; Anegawa, T.

    2002-01-01

    The ABWR-II, which is aimed to be the next generation reactor following the latest BWR: Advanced Boiling Reactor (ABWR), is now under development jointly by the Japanese BWR utilities, General Electric Company, Hitachi Limited, and Toshiba Corporation. The key objectives of ABWR-II development include improvement in economics and further sophistication in safety for commercialization in the late 2010's and after. This paper summarizes the current status of ABWR-II development focusing on economics and safety. Plant power rating, fuel size, CRD rationalization and outage period are discussed from a cost reduction perspective. In terms of safety, the features such as diversification in emergency power sources and passive system application against severe accidents are being introduced. (author)

  3. The impact of new technology on compact disposal costs

    International Nuclear Information System (INIS)

    Arrowsmith, H.W.; Zidow, T.M.

    1989-01-01

    The cost of disposal of low-level waste (LLW) has increased dramatically since the 1960s. In the '60s waste was put into the ground for a fee of less than $1/ft 3 in truck-size quantities. Fees for the same burial services today begin in the $30/ft 3 range and increase rapidly from that level. Although the user fees associated with compacts will clearly exceed $100/ft 3 , improved operating techniques by the generators will reduce the amount of waste produced. Current estimates suggest this reduction will drive the per-cubic-foot cost of disposal over the $200 mark. Technology is the only solution to this predicament. While costs already incurred will contribute to the fixed portion of the base user fees, the means to minimize the variable portion of the fees in now at hand. This variable portion results from on-site processing costs, waste form stability enhancements, and ongoing disposal unit construction. Technology exists to minimize volume through ultra compaction and selective incineration, greatly reducing the ongoing disposal unit construction requirements. Vitrification of incinerator residue provides waste form stability far in excess of that provided by concrete overpacks. As overpacks represent the second largest material cost at an engineered barrier facility, the potential for cost savings is substantial

  4. Method for the construction of a nuclear reactor with a prestressed concrete pressure vessel

    International Nuclear Information System (INIS)

    Schoening, J.; Schwiers, H.G.

    1981-01-01

    Method for the construction of nuclear reactors with prestressed concrete pressure vessel, providing during the initial stage of construction of the prestressed concrete pressure vessel a support structure around the liner. This enables an early mounting of core components in clean conditions as well as load reductions for final concreting in layers of the prestressed concrete pressure vessel. By applying the support structure, the overall assembly time of these nuclear power plant is considerably reduced without extra cost. (orig.) [de

  5. Alternatives for operational cost reduction in oil pipelines; Alternativas para reducao de custos energeticos operacionais em oleodutos

    Energy Technology Data Exchange (ETDEWEB)

    Krause, Philipe Barroso; Carneiro, Leonardo Motta; Pires, Luis Fernando Goncalves [Pontificia Universidade Catolica do Rio de Janeiro (SIMDUT/DEM/ PUC-Rio), RJ (Brazil). Dept. de Engenharia Mecancia. Nucleo de Simulacao Termo-Hidraulica de Dutos

    2012-07-01

    This paper intends to give a brief overview of some cost reduction alternatives in oil pipelines, to optimize the pipeline operation. Four different alternatives are presented, based on previous studies made on existing pipelines, to demonstrate the response obtained with these solutions. Pipeline operation, especially on mature ones, tends to have a high operational cost, be by tradition, the aging of the installation, change of operational characteristics - such as nominal flow, product, or even flow direction - for which the pipeline wasn't originally designed. The alternatives showed allow for an increase survival time of the pipeline, without resorting to major changes, such as replacement of pipes or adding pumping stations to the system. The alternative studied varies from no implementation cost to high installation cost or operational cost increase, depending on the system and the alternative chosen. From changing the pump arrays during operation or changing the products viscosity with different blends, that represent virtually no cost to the pipeline operation, to the use of VFDs, with a high installation cost or DRA, which increase the operational cost. (author)

  6. Rock cavity construction of a nuclear power plant: a case study

    International Nuclear Information System (INIS)

    Loken, P.C.; Bakke, J.; Gloersen, I.

    1979-01-01

    The major findings of a comprehensive study of the major aspects of rock cavity construction of a large nuclear power plant are: (1) current technology is adequate for the realization of such construction; (2) a method for estimating the probability of rock fallout and gross cavity instability is presently not available; (3) certain design modifications and amplifications must be made to prevent dependent failures; (4) no significant reduction in the immediate radiological effects of Class 9 accidents will result unless special design measures are made for this purpose; (5) the vulnerability of the plant to certain external effects is significantly reduced; (6) the total time for the realization of such construction will be significantly longer than that for a traditionally constructed plant; and (7) the extra cost will be substantial

  7. Minimization of Construction Costs for an All Battery-Swapping Electric-Bus Transportation System: Comparison with an All Plug-In System

    Directory of Open Access Journals (Sweden)

    Shyang-Chyuan Fang

    2017-06-01

    Full Text Available The greenhouse gases and air pollution generated by extensive energy use have exacerbated climate change. Electric-bus (e-bus transportation systems help reduce pollution and carbon emissions. This study analyzed the minimization of construction costs for an all battery-swapping public e-bus transportation system. A simulation was conducted according to existing timetables and routes. Daytime charging was incorporated during the hours of operation; the two parameters of the daytime charging scheme were the residual battery capacity and battery-charging energy during various intervals of daytime peak electricity hours. The parameters were optimized using three algorithms: particle swarm optimization (PSO, a genetic algorithm (GA, and a PSO–GA. This study observed the effects of optimization on cost changes (e.g., number of e-buses, on-board battery capacity, number of extra batteries, charging facilities, and energy consumption and compared the plug-in and battery-swapping e-bus systems. The results revealed that daytime charging can reduce the construction costs of both systems. In contrast to the other two algorithms, the PSO–GA yielded the most favorable optimization results for the charging scheme. Finally, according to the cases investigated and the parameters of this study, the construction cost of the plug-in e-bus system was shown to be lower than that of the battery-swapping e-bus system.

  8. Optimal scenario balance of reduction in costs and greenhouse gas emissions for municipal solid waste management

    Institute of Scientific and Technical Information of China (English)

    邓娜; 张强; 陈广武; 齐长青; 崔文谦; 张于峰; 马洪亭

    2015-01-01

    To reduce carbon intensity, an improved management method balancing the reduction in costs and greenhouse gas (GHG) emissions is required for Tianjin’s waste management system. Firstly, six objective functions, namely, cost minimization, GHG minimization, eco-efficiency minimization, cost maximization, GHG maximization and eco-efficiency maximization, are built and subjected to the same constraints with each objective function corresponding to one scenario. Secondly, GHG emissions and costs are derived from the waste flow of each scenario. Thirdly, the range of GHG emissions and costs of other potential scenarios are obtained and plotted through adjusting waste flow with infinitely possible step sizes according to the correlation among the above six scenarios. And the optimal scenario is determined based on this range. The results suggest the following conclusions. 1) The scenarios located on the border between scenario cost minimization and GHG minimization create an optimum curve, and scenario GHG minimization has the smallest eco-efficiency on the curve;2) Simple pursuit of eco-efficiency minimization using fractional programming may be unreasonable; 3) Balancing GHG emissions from incineration and landfills benefits Tianjin’s waste management system as it reduces GHG emissions and costs.

  9. A conceptional design, cost and sensitivity analysis on adsorption process for uranium recovery from seawater

    International Nuclear Information System (INIS)

    Ogata, Noboru

    1986-01-01

    The system model for a conceptional design and cost estimation was studied on a multi-layered fluidizing bed with a pump which used hydrous titanium oxide (HTO) and amidoxime resin (AOR) as adsorbents. The cost effect of some parameters, namely characteristics of adsorbent, operating conditions, price of materials and some others, were estimated, and finally there was shown a direction of improvement and a possibility of cost reduction. The conceptional design and operating condition were obtained from the balance point on expansion ratio, recovery and characteristics of adsorbent. A suitable plan was obtained from the minimum cost condition in some level of the expansion ratio and some parameters. HTO was heavy in density and cheap in price. The main results of the study indicated that the thickness of the bed was 1 m, the linear velocity of seawater was 52 m/hr, the number of bed layers was 4, the construction cost of a 100 t/y plant was 10 billion yen, and the uranium cost was 160 $/1b. AOR had a large adsorption capacity. As the main results, the thickness of bed was 0.08 m, the linear velosity of seawater was 11.6 m, the number of the bed layers was 27, the construction cost of a 100 t/y plant was 15 billion yen, and the uranium cost was 280 $/1b. The size of the 100 t/y plant was about 800 m length x 80 m depth x 30 m height at 80 % of recovery. An increase of adsorption capacity in HTO, and an increase of density and particle size in AOR had the greatest merit for cost reduction. Other effective parameters were the adsorption velocity, the recovery, temperature, the price of adsorbent, the manufacturing cost of instrument, and the rate of interest. The cost of uranium by this process had a possibility of cost reduction to 67 $/1b at HTO and 79 $/1b at AOR. (author)

  10. Cost reductions in nickel-hydrogen battery

    Science.gov (United States)

    Beauchamp, Richard L.; Sindorf, Jack F.

    1987-01-01

    Significant progress was made toward the development of a commercially marketable hydrogen nickel oxide battery. The costs projected for this battery are remarkably low when one considers where the learning curve is for commercialization of this system. Further developmental efforts on this project are warranted as the H2/NiO battery is already cost competitive with other battery systems.

  11. Design to Cost and Life Cycle Cost.

    Science.gov (United States)

    1980-07-01

    MANAGEMENT TASK ORIENTATED COST STRUCTURE 5. COSTS OF CONSTRUCTION INIFRA 2. COSTS DURING DEVELOPMENT -6. COSTS OF TRAINING 3. COSTS DURING TESi ...de r~duction des coats, ii faut disponer de ?!vyenr. performants d’eetimation des coats en main-d’oeuvre et en applrvininrinesent. Cam moyenm doivent

  12. Model improves oil field operating cost estimates

    International Nuclear Information System (INIS)

    Glaeser, J.L.

    1996-01-01

    A detailed operating cost model that forecasts operating cost profiles toward the end of a field's life should be constructed for testing depletion strategies and plans for major oil fields. Developing a good understanding of future operating cost trends is important. Incorrectly forecasting the trend can result in bad decision making regarding investments and reservoir operating strategies. Recent projects show that significant operating expense reductions can be made in the latter stages o field depletion without significantly reducing the expected ultimate recoverable reserves. Predicting future operating cost trends is especially important for operators who are currently producing a field and must forecast the economic limit of the property. For reasons presented in this article, it is usually not correct to either assume that operating expense stays fixed in dollar terms throughout the lifetime of a field, nor is it correct to assume that operating costs stay fixed on a dollar per barrel basis

  13. Ordering Cost Reduction in Inventory Model with Defective Items and Backorder Price Discount

    Directory of Open Access Journals (Sweden)

    Karuppuchamy Annadurai

    2014-01-01

    Full Text Available In the real market, as unsatisfied demands occur, the longer the length of lead time is, the smaller the proportion of backorder would be. In order to make up for the inconvenience and even the losses of royal and patient customers, the supplier may offer a backorder price discount to secure orders during the shortage period. Also, ordering policies determined by conventional inventory models may be inappropriate for the situation in which an arrival lot contains some defective items. To compensate for the inconvenience of backordering and to secure orders, the supplier may offer a price discount on the stockout item. The purpose of this study is to explore a coordinated inventory model including defective arrivals by allowing the backorder price discount and ordering cost as decision variables. There are two inventory models proposed in this paper, one with normally distributed demand and another with distribution free demand. A computer code using the software Matlab 7.0 is developed to find the optimal solution and present numerical examples to illustrate the models. The results in the numerical examples indicate that the savings of the total cost are realized through ordering cost reduction and backorder price discount.

  14. Cost-effective reduction of eutrophication in the Gulf of Kalloni (Island of Lesvos, Greece

    Directory of Open Access Journals (Sweden)

    B. ZANOU

    2001-06-01

    Full Text Available This study presents a cost-effective analysis by comparing the costs of measures (options to improve the quality of bathing waters in the Gulf of Kalloni (island of Lesvos, Greece in order to reduce the anthropogenic eutrophication in the coastal water of the Kalloni Gulf. The Gulf of Kalloni is a semi-enclosed gulf (115 km2 which receives municipal wastewater, agricultural activity drainage, and at times sewage from olive oil plants processing the local olives harvest. The area of study consists of the coastal waters and the river basin of which water run-off drains into the gulf. Four options are comparable in their environmental effectiveness to reduce eurtophication damages which are: municipal wastewater treatment plant, construction of dams, organic farming plus training and olive oil wastewater treatment plant.

  15. Reduction in energy consumption and operating cost in a dried corn warehouse using logistics techniques

    Directory of Open Access Journals (Sweden)

    Korrakot Y. Tippayawong

    2013-06-01

    Full Text Available Corn is one of the major economic crops in Thailand. Corn postharvest operation involves various practices that consume a large amount of energy. Different energy conservation measures have been implemented but logistics consideration is not normally employed. In this work, attempt has been made to demonstrate that logistics techniques can offer a significant reduction in energy and cost. The main objective of this work is to identify and demonstrate possible approaches to improving energy efficiency and reducing operating cost for a dried corn warehouse operator. Three main problems are identified: (i relatively high fuel consumption for internal transfer process, (ii low quality of dried corn, and (iii excess expenditure on outbound transportation. Solutions are proposed and implemented using logistics operations. Improvement is achieved using plant layout and shortest path techniques, resulting in a reduction of almost 50% in energy consumption for the internal transfer process. Installation of an air distributor in the grain storage unit results in a decrease in loss due to poor-quality dried corn from 17% to 10%. Excess expenditure on dried corn distribution is reduced by 6% with application of a global positioning system.

  16. ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

    Science.gov (United States)

    Hall, Timothy A.

    2011-01-01

    In 2008 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organization to find ways to reduce the costs of International Space station (ISS) console operations in the Mission Control Center (MCC). Each MOD organization was asked to identify projects that would help them attain a goal of a 30% reduction in operating costs by 2012. The MOD Operations and Planning organization responded to this challenge by launching several software automation projects that would allow them to greatly improve ISS console operations and reduce staffing and operating costs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the plan of eliminating two full time ISS console support positions by 2012. This will account for an overall 10 EP reduction in staffing for the Operations and Planning organization. These automation projects focused on utilizing software to automate many administrative and often repetitive tasks involved with processing ISS planning and daily operations information. This information was exchanged between the ground flight control teams in Houston and around the globe, as well as with the ISS astronaut crew. These tasks ranged from managing mission plan changes from around the globe, to uploading and downloading information to and from the ISS crew, to even more complex tasks that required multiple decision points to process the data, track approvals and deliver it to the correct recipient across network and security boundaries. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture between several planning tools; as well as a engaging a previously research level technology (TRL 2-3) developed by Ames Research Center (ARC) that utilized an intelligent agent based system to manage and automate file traffic flow

  17. Opportunities for cost reduction and improved environmental impact in the lead and lead/acid battery industries

    Science.gov (United States)

    Lewis, N.

    The opportunities for cost reduction through improved environmental performance exist in many companies, but often are not realized. This paper describes the efforts of a typical firm — Calder Industrial Materials (CIM) — that is experiencing ever-tighter environmental controls and profit erosion through the effects of new environmental legislation. At the same time, however, CIM sees opportunities to reduce its environmental burden and cut costs. As the story unfolds, readers may well discover many parallels with their own companies. It may even spur some into action, for remember, every £1000 saved requires ten times the turnover to generate the same profit.

  18. Calculating utility prudency issue costs

    International Nuclear Information System (INIS)

    Nielsen, K.R.

    1985-01-01

    The nuclear industry, particularly utilities and their construction, engineering and vendor agents, is faced with a surging increase in prudency management audits. What started as primarily a nuclear project-oriented requirement has spread to encompass most significant utility capital construction projects. Such audits are often a precedent condition to commencement of rate hearings. The cost engineer, a primary major capital construction project participant, is required to develop or critique ''prudency issue'' costs as part of such audits. Although utility costs in the broadest sense are potentially at issue, this paper concentrates on the typical project/construction management costs. The costs of design, procurement and construction are all subject to the calculation process

  19. Prefabrication in Building Construction: A Perspective of Pakistan Construction Industry

    Directory of Open Access Journals (Sweden)

    Nafees Ahmed Memon

    2014-07-01

    Full Text Available Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight method as a MCDM approach. The results depict that main advantages of prefabrication are ?Shorter construction time? and ?Less construction site waste?. The top hindrances in adopting prefabrication as identified in this study are: ?Higher initial construction cost? and ?Inflexible for design changes?. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan

  20. Prefabrication in building construction: a perspective of pakistan construction industry

    International Nuclear Information System (INIS)

    Memon, N.A.; Memon, F.A.; Khehro, S.H.

    2014-01-01

    Construction industry is facing many problems in terms of construction waste, quality, environment, durability, safety and higher construction cost. Adoption of prefabrication is a possible solution to such problems. Accordingly, there is a need to study the prospects that would stimulate the appropriate discussion of the suitability of prefabrication and other construction methods for concrete buildings. Therefore, this study investigates the significance of advantages in adopting prefabrication along with hindrances through questionnaire survey. The data has been analyzed using RIW (Relative Importance Weight) method as a MCDM approach. The results depict that main advantages of prefabrication are Shorter construction time and Less construction site waste. The top hindrances in adopting prefabrication as identified in this study are: Higher initial construction cost and Inflexible for design changes. Based on the survey results and apparent progress in the adoption of prefabrication around the world, it is concluded that the use of prefabrication is likely to increase in developing countries like Pakistan. (author)

  1. Reduction of the radioactive waste volume from Belgian NPP: Reality, costs and goals

    International Nuclear Information System (INIS)

    Havard, P.; Lemmens, A.; Mannaerts, K.

    2001-01-01

    The growing awareness of the existence of waste generated by human activities and its environmental impact is one of the critical events of the late twentieth century. All industrial activities produce waste and nuclear industry is no exception. But nuclear power plants produce smaller amount of waste that makes it possible to treat it with particular care. This paper describes the reduction in the amount of waste, the consequences this has had on the associated costs and the action taken to control the development of both objectives. (author)

  2. Construction and operation of biogas plants. Bau und Betrieb von Biogasanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Koenig, F. von

    1985-01-01

    Biogas utilisation in agriculture has increased considerably as a consequence of the energy crisis. So far, energy production was the most important aspect, and the high-quality natural fertilizer offered by the fermentation residues was commonly neglected. This fertilizer is an effective substitute for commercial fertilizers and thus contributes to the reduction of environmental pollution. The book discusses the chemical and biological mechanisms, the criteria of selection for plants and materials, optimum gas production techniques, uses of the product gas, and the advantages and properties of the biofertilizer produced. Planning procedures, design, construction, function and performance of several biogas production plants now in operation are described. Hints are given for do-it-yourself construction, as are cost-benefit calculations and decision aids for construction.

  3. Intense volume reduction of mixed and low-level waste, solidification in sulphur polymer concrete, and excellent disposal at minimum cost

    International Nuclear Information System (INIS)

    Darnell, G.R.

    1990-01-01

    Progressive changes in regulations governing the disposal of the nation's radioactive and hazardous wastes demand the development of more advanced treatment and disposal systems. The U.S. Department of Energy's Radioactive Waste Technology Support Program (formerly the Defense Low-Level Waste Management Program) was given the task of demonstrating the degree of excellence that could be achieved at reasonable cost using existing technology. The resulting concept is a Waste Treatment and Disposal Complex that will fully treat contact-handled mixed and low-level radioactive waste to a disposable product that is totally liquid-free and approximately 98% inorganic. An excellent volume reduction factor is achieved through sorting, sizing, incineration, vitrification, and final grouting. Inorganic waste items larger than 1/4 in. will be placed in inexpensive, uniform-sized, smooth-sided, thin-walled steel boxes. The smaller particles will be mixed with sulfur polymer concrete and pumped into the boxes, filling most voids. The appendage-free boxes measuring 1 by 1 by 1 m will be stacked tightly in an abovegrade, earth-mounded, concrete disposal vault where a temporary roof will protect them from rain and snow. A concrete roof poured directly on top of the dense, essentially voidless waste stack will be topped by an engineered, water-shedding earthen cover. Total cost for design, construction, testing, 30 years of treatment and disposal, administration, decontamination and decommissioning, site closure, and postclosure monitoring and maintenance will cost less per cubic foot than is currently expended for subsurface disposal. A radiological performance assessment shows this concept will exceed the nation's existing disposal systems and governmental performance objectives for the protection of the general public by a factor of 30,000

  4. Cost reduction potentials of offshore wind power in Germany; Kostensenkungspotenziale der Offshore-Windenergie in Deutschland

    Energy Technology Data Exchange (ETDEWEB)

    Hobohm, Jens; Krampe, Leonard; Peter, Frank [Prognos AG, Berlin (Germany). Bereich Energiewirtschaft

    2014-01-15

    Offshore wind power is a major hope for the German energy turnaround. However, it will only be possible to tap its cost reduction potentials if industry, the political leadership and the administrative authorities join forces to create the necessary preconditions. An important requirement for this capital-intensive technology are stable legal and political framework conditions. A recent study on the future shows what needs to be done.

  5. Techniques for cost-effective electric information sharing; Cost balance wo koryoshita denshi joho kyoyuka gijutsu

    Energy Technology Data Exchange (ETDEWEB)

    Shinohara, Y. [Central Research Institute of Electric Power Industry, Tokyo (Japan)

    1997-04-01

    The key technology that can effectively support the sharing of each information such as documents, data, and know-how was rearranged to clarify how to utilize it for constructing an electronic information sharing system. The key technology that supports the sharing of electronic information was rearranged from the viewpoint of information gathering, information rearrangement, and information utilization. The reduction in cost for information gathering and rearrangement is indispensable to the promotion of much information sharing. However, each automation method presently causes the deterioration in quality of the rearranged information and the increase in cost for information utilization. To realize a practical electronic information sharing system, it is important to combine the key technologies properly so that the total cost balance of information gathering and information utilization is improved. Therefore, the combination of character recognition by OCR and unpreciseness retrieval, and the complementary combination of automatic document sorting, based on multiple incomplete rearrangement systems, and multiple sorting menus were proposed. 23 refs., 5 figs., 2 tabs.

  6. Low-Cost Radon Reduction Pilot Study

    Energy Technology Data Exchange (ETDEWEB)

    Rose, William B. [Partnership for Advanced Residential Retrofit, Champaign, IL (United States); Francisco, Paul W. [Partnership for Advanced Residential Retrofit, Champaign, IL (United States); Merrin, Zachary [Partnership for Advanced Residential Retrofit, Champaign, IL (United States)

    2015-09-01

    The aim of the research was to conduct a primary scoping study on the impact of air sealing between the foundation and the living space on radon transport reduction across the foundation-living space floor assembly. Fifteen homes in the Champaign, Illinois area participated in the study. These homes were instrumented for hourly continuous radon measurements and simultaneous temperature and humidity the foundation was improved. However, this improved isolation did not lead to significant reductions in radon concentration in the living space. Other factors such as outdoor temperature were shown to have an impact on radon concentration.

  7. Cost of photovoltaic energy systems as determined by balance-of-system costs

    Science.gov (United States)

    Rosenblum, L.

    1978-01-01

    The effect of the balance-of-system (BOS), i.e., the total system less the modules, on photo-voltaic energy system costs is discussed for multikilowatt, flat-plate systems. Present BOS costs are in the range of 10 to 16 dollars per peak watt (1978 dollars). BOS costs represent approximately 50% of total system cost. The possibility of future BOS cost reduction is examined. It is concluded that, given the nature of BOS costs and the lack of comprehensive national effort focussed on cost reduction, it is unlikely that BOS costs will decline greatly in the next several years. This prognosis is contrasted with the expectations of the Department of Energy National Photovoltaic Program goals and pending legislation in the Congress which require a BOS cost reduction of an order of magnitude or more by the mid-1980s.

  8. Feasibility of fractionating Myoview cold kits for cost reduction

    International Nuclear Information System (INIS)

    Penglis, S.; Tsopelas, C.

    1999-01-01

    Full text: Myoview is a freeze-dried ethylene diphosphine ligand that upon reconstitution with 99 Tc m -pertechnetate yields a preparation containing the lipophilic cationic myocardial imaging agent 99 Tc m -tetrofosmin (Tf). The aim of this study was to determine the feasibility of fractionating Myoview kits to reduce the cost of the kit, currently A$350 per vial. Myoview vials were reconstituted with N 2 -flushed saline and split into 4 or 5 aliquots of 0.5 ml, then stored at -80 deg C in N 2 -filled vials for up to 3 months. 99 Tc m -Tf was prepared by the addition of varying volumes of 99 Tc m -pertechnetate (1.1 GBq.ml- 1 ) to give a final ligand concentration of 14.4 μg.ml- 1 , followed by a 15 min incubation at room temperature. Radiochemical purity (RCP) was examined at 0, 1, 2 and 3 months post-fractionation. At each time point, RCP was determined at 0,1, 2, 4, 6 and 24 h post-reconstitution. RCP was measured using the thin layer chromatography method according to the manufacturer's instructions. Over the 3 month evaluation period, RCP was maintained at 96.4 ± 1.7% (n = 48) over 24 h at room temperature. Animal biodistribution studies were used to validate the final product from the full cold kit to that from the fractionated kits. In conclusion, these results show that Myoview kits can be successfully fractionated and stored for up to 3 months. The subsequent 99 Tc m -Tf can be used to provide significant cost reductions, especially when only 1 patient dose is required

  9. Prevention program at construction worksites aimed at improving health and work ability is cost-saving to the employer: Results from an RCT

    NARCIS (Netherlands)

    Oude Hengel, K.M.; Bosmans, J.E.; Dongen, J.M. van; Bongers, P.M.; Beek, A.J. van der; Blatter, B.M.

    2014-01-01

    Background: To prolong sustainable healthy working lives of construction workers, a prevention program was developed which aimed to improve the health and work ability of construction workers. The objective of this study was to analyze the cost-effectiveness and financial return from the employers'

  10. Using biomass for climate change mitigation and oil use reduction

    Energy Technology Data Exchange (ETDEWEB)

    Gustavsson, L; Holmberg, J; Dornburg, V; Sathre, R; Eggers, T; Mahapatra, K; Marland, G [Ecotechnology, Mid Sweden University, Oestersund (Sweden)

    2007-11-15

    In this paper, we examine how an increased use of biomass could efficiently meet Swedish energy policy goals of reducing carbon dioxide (CO{sub 2}) emissions and oil use. In particular, we examine the trade-offs inherent when biomass use is intended to pursue multiple objectives. We set up four scenarios in which up to 400 PJ/year of additional biomass is prioritised to reduce CO{sub 2} emissions, reduce oil use, simultaneously reduce both CO{sub 2} emission and oil use, or to produce ethanol to replace gasoline. Technologies analysed for using the biomass include the production of electricity, heat, and transport fuels, and also as construction materials and other products. We find that optimising biomass use for a single objective (either CO{sub 2} emission reduction or oil use reduction) results in high fulfilment of that single objective (17.4 Tg C/year and 350 PJ oil/year, respectively), at a monetary cost of 130-330 million EUR/year, but with low fulfilment of the other objective. A careful selection of biomass uses for combined benefits results in reductions of 12.6 Tg C/year and 230 PJ oil/year (72% and 67%, respectively, of the reductions achieved in the scenarios with single objectives), with a monetary benefit of 45 million EUR/year. Prioritising for ethanol production gives the lowest CO{sub 2} emissions reduction, intermediate oil use reduction, and the highest monetary cost. (author)

  11. Implications of the international reduction pledges on long-term energy system changes and costs in China and India

    International Nuclear Information System (INIS)

    Lucas, Paul L.; Shukla, P.R.; Chen, Wenying; Ruijven, Bas J. van; Dhar, Subash; Elzen, Michel G.J. den; Vuuren, Detlef P. van

    2013-01-01

    This paper analyses the impact of postponing global mitigation action on abatement costs and energy systems changes in China and India. It compares energy-system changes and mitigation costs from a global and two national energy-system models under two global emission pathways with medium likelihood of meeting the 2 °C target: a least-cost pathway and a pathway that postpones ambitious mitigation action, starting from the Copenhagen Accord pledges. Both pathways have similar 2010–2050 cumulative greenhouse gas emissions. The analysis shows that postponing mitigation action increases the lock-in in less energy efficient technologies and results in much higher cumulative mitigation costs. The models agree that carbon capture and storage (CCS) and nuclear energy are important mitigation technologies, while the shares of biofuels and other renewables vary largely over the models. Differences between India and China with respect to the timing of emission reductions and the choice of mitigation measures relate to differences in projections of rapid economic change, capital stock turnover and technological development. Furthermore, depending on the way it is implemented, climate policy could increase indoor air pollution, but it is likely to provide synergies for energy security. These relations should be taken into account when designing national climate policies. - highlights: • We analyze long-term impacts of the international pledges for China and India. • We compare a least-cost pathway with a pathway starting from the Copenhagen pledges. • Postponing mitigation action implies much higher cumulative mitigation costs. • Postponing increases fossil fuel dependence and requires deeper long-term reductions. • Countries differ mainly due to different periods of rapid economic change

  12. A Methodology for Constructing Marginal Abatement Cost Curves for Climate Action in Cities

    Directory of Open Access Journals (Sweden)

    Nadine Ibrahim

    2016-03-01

    Full Text Available As drivers of climate action, cities are taking measures to reduce greenhouse gas (GHG emissions, which if left unabated pose a challenge to meeting long-term climate targets. The economics of climate action needs to be at the forefront of climate dialogue to prioritize investments among competing mitigation measures. A marginal abatement cost (MAC curve is an effective visualization of climate action that initiates a technical and economic discussion of the cost-effectiveness and abatement potential of such actions among local leaders, policy makers, and climate experts. More commonly demonstrated for countries, MAC curves need to be developed for cities because of their heterogeneity, which vary in their urban activities, energy supply, infrastructure stock, and commuting patterns. The methodology for constructing bottom-up MAC curves for cities is presented for technologies that offer fuel switching and/or energy efficiencies, while considering technology lifetimes, city-specific electricity and fuel prices, and emission intensities. Resulting MAC curves are unique to every city, and chart the pathway towards low-carbon growth by prioritizing measures based on cost-effectiveness. A case study of Toronto’s climate targets demonstrates the prioritization of select technologies. Leveraging MAC curves to support climate programs enables cities to strategically invest in financing climate action and designing incentives.

  13. International comparison of the economy of constructing nuclear power plants by using the method of referred investment costs in Czechoslovakia and in the USA

    International Nuclear Information System (INIS)

    Majer, P.; Jelen, J.

    1989-01-01

    The method of referred investment costs was applied to a comparison of the economy of constructing the nuclear power plant at Temelin, Czechoslovakia, with that for the hypothetic nuclear power plant at Middletown, USA. For a reasonably adopted Czechoslovak crown/USD rate, the obtained costs for building the Temelin power plant are 50% higher than those for building the reference Middletown power plant. This compares rather favorably with the general level of investment costs in Czechoslovakia under the present economic conditions. The analysis performed shows that savings in investment costs should be sought in the fields of technological modernization of preparatory work and in all construction work, with the aim to reduce particularly live work. (P.A.). 12 tabs., 8 refs

  14. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    International Nuclear Information System (INIS)

    Yu, Ann T.W.; Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara

    2013-01-01

    Highlights: ► A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. ► However, the reduction cannot be sustained. ► Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006–2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  15. Impact of Construction Waste Disposal Charging Scheme on work practices at construction sites in Hong Kong

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Ann T.W., E-mail: bsannyu@polyu.edu.hk [Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong); Poon, C.S.; Wong, Agnes; Yip, Robin; Jaillon, Lara [Department of Civil and Structural Engineering, Hong Kong Polytechnic University, Hung Hom, Kowloon (Hong Kong)

    2013-01-15

    Highlights: Black-Right-Pointing-Pointer A significant reduction of construction waste was achieved at the first 3 years of CWDCS implementation. Black-Right-Pointing-Pointer However, the reduction cannot be sustained. Black-Right-Pointing-Pointer Implementation of the CWDCS has generated positive effects in waste reduction by all main trades. - Abstract: Waste management in the building industry in Hong Kong has become an important environmental issue. Particularly, an increasing amount of construction and demolition (C and D) waste is being disposed at landfill sites. In order to reduce waste generation and encourage reuse and recycling, the Hong Kong Government has implemented the Construction Waste Disposal Charging Scheme (CWDCS) to levy charges on C and D waste disposal to landfills. In order to provide information on the changes in reducing waste generation practice among construction participants in various work trades, a study was conducted after 3 years of implementation of the CWDCS via a structured questionnaire survey in the building industry in Hong Kong. The study result has revealed changes with work flows of the major trades as well as differentiating the levels of waste reduced. Three building projects in the public and private sectors were selected as case studies to demonstrate the changes in work flows and the reduction of waste achieved. The research findings reveal that a significant reduction of construction waste was achieved at the first 3 years (2006-2008) of CWDCS implementation. However, the reduction cannot be sustained. The major trades have been influenced to a certain extent by the implementation of the CWDCS. Slight improvement in waste management practices was observed, but reduction of construction waste in the wet-finishing and dry-finishing trades has undergone little improvement. Implementation of the CWDCS has not yet motivated subcontractors to change their methods of construction so as to reduce C and D waste.

  16. Design, construction and commissioning of a simple, low cost permanent magnet quadrupole doublet

    International Nuclear Information System (INIS)

    Conard, E.M.; Parcell, S.K.; Arnott, D.W.

    1999-01-01

    In the framework of new beam line developments at the Australian National Medical Cyclotron, a permanent magnet quadrupole doublet was designed and built entirely in house. The design proceeded from the classical work by Halbach et al. but emphasised the 'low cost' aspect by using simple rectangular NdFeB blocks and simple assembly techniques. Numerical simulations using the (2-D) Gemini code were performed to check the field strength and homogeneity predictions of analytical calculations. This paper gives the reasons for the selection of a permanent magnet, the design and construction details of the quadrupole doublet and its field measurement results. (authors)

  17. Drainage filters and constructed wetlands to mitigate site-specific nutrient losses

    DEFF Research Database (Denmark)

    Kjærgaard, Charlotte; Hoffmann, Carl Christian; Iversen, Bo Vangsø

    Despite substantial efforts, the leaching of nutrients from agricultural land is still a serious and costly environmental problem in Denmark and elsewhere. The quality goals of the European Water Framework Directive (WFD) for the aquatic environment require a substantial reduction of diffuse nutr...... drainage. The project studies different approaches of implementing the filter technologies including drainage well or drainage pipe filters as well as surface-flow and sub-surface flow constructed wetlands....

  18. Comparative Study on the Cost of Building Public House Construction Using Red Brick and Interlock Brick Building Material in the City of Banda Aceh

    Science.gov (United States)

    Malahayati, Nurul; Hayati, Yulia; Nursaniah, Cut; Firsa, T.; Fachrurrazi; Munandar, Aris

    2018-05-01

    Red brick and interlocking brick are the building materials that are often used for wall installation work on houses construction. In the development of building materials technology and cost savings, interlocking brick can be alternative to replace red bricks. In Aceh Province, the use of interlocking bricks is less popular compared to other big cities in Indonesia. Interlocking brick is made from a mixture of clay, concrete sand and compacted cement and one of the environmentally friendly materials because it does not burn the process like red brick material. It is named interlocking brick because the installation method is locked together and it serves as a structural and partition wall of residential buildings. The aims of this study are to compare the cost of building a house in Banda Aceh City using red brick and interlock brick building materials. The data were obtained from interviews and questionnaires distributed to respondents who had built houses in Banda Aceh City. The results concluded that the house construction cost using interlock brick offer lower construction cost at comparable quality rather than using red brick.

  19. Construction and cost experience regarding the 2nd pool house for spent fuel storage facility in the Atucha Power Station

    International Nuclear Information System (INIS)

    Barbosa, C.A.

    1980-01-01

    The Atucha I second pool house storage for spent fuel is designed as an extension of the Atucha I power station. The two are linked by civil structure, controlling circuits, electrical and compressed air and water supplies, low level wastes disposal, ventilation under pressure maintenance, and, most important, the ability to transfer spent and new fuel in both directions. Because the second pool house is, by location and design, an extension of the existing installation, and since there is no design departure, regarding storage and transfer of fuel from that of the original installation, the rules and regulations applied for its construction were the same as those valid for the Atucha I construction. The requirement not to exceed a four-year period for construction and commissioning was determined by the need to have storage room for the Atucha I fuel. Argentina will meet the 1982 target by having the installation available during the second half of 1981. The second pool house is a wet storage location with a capacity of 1000 tons metallic uranium. It was designed by the Kraftwerk Union of West Germany along the same lines as the 440-ton storage location originally built with the station. The Atomic Energy Commission of Argentina has managed the construction and participated in project and design stages. As in the original pool, the 6 m long assemblies are stacked in double tiers. The cost figures which are mentioned differ from previously released figures and are not the final ones. With civil construction almost finished and mechanical erection started, the present estimates should not differ by more than 10% from the final figures. The installation has an investment cost of 61 million dollars, (1980), and, depending on the amortization time span considered, a total yearly cost per kg of capacity of metallic uranium, ranging between 5.5 and 9.3 dollars per kg

  20. U-AVLIS feed conversion using continuous metallothermic reduction of UF4: System description and cost estimate

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of this document is to present a system description and develop baseline capital and operating cost estimates for commercial facilities which produced U-Fe feedstock for AVLIS enrichment plants using the continuous fluoride reduction (CFR) process. These costs can then be used together with appropriate economic assumptions to calculate estimated unit costs to the AVLIS plant owner (or utility customer) for such conversion services. Six cases are being examined. All cases assume that the conversion services are performed by a private company at a commercial site which has an existing NRC license to possess source material and which has existing uranium processing operations. The cases differ in terms of annual production capacity and whether the new process system is installed in a new building or in an existing building on the site. The six cases are summarized here

  1. Profit ability versus construction equipment maintenance

    OpenAIRE

    Clutts, Craig A.

    2010-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited Construction equipment is a high cost of capital investment necessary for the successful existence of a private construction company and essential to the mission success of the Naval Construction Force (NCF). The highest impact cost factor other than the initial purchase investment is the expenses related to maintenance and repair. As the equipment ages, the ownership costs decrease an...

  2. Construction of a Chemical Sensor/Instrumentation Package Using Fiber Optic and Miniaturization Technology

    Science.gov (United States)

    Newton, R. L.

    1999-01-01

    The objective of this research was to construct a chemical sensor/instrumentation package that was smaller in weight and volume than conventional instrumentation. This reduction in weight and volume is needed to assist in further reducing the cost of launching payloads into space. To accomplish this, fiber optic sensors, miniaturized spectrometers, and wireless modems were employed. The system was evaluated using iodine as a calibration analyte.

  3. On the organization of commercial production of profiled polyethylene sheets used for water proofing under NPP construction

    International Nuclear Information System (INIS)

    Likhachev, V.D.; Korenev, K.I.; Chukvaidze, K.I.; Dzhurinskij, M.B.

    1986-01-01

    The problem on the organization of commercial production of profiled polyethylene sheets with special longitudinal ribs which are anchorized in concrete is considered. The use of new water proofing material applied under NPP construction allows one to enhance the commercialization of water proofing works which ensured cost reduction of these works

  4. Assessment of environmental benefits of flyover construction over signalized junctions: a case study.

    Science.gov (United States)

    Goyal, S K; Goel, Sangita; Tamhane, S M

    2009-01-01

    In the present study, the impact of the flyover construction to curb traffic congestion problem has been assessed in terms of traffic decongestion, time saving, fuel saving and emission reduction. A flyover has also been constructed over four signalized junctions in the main commercial area in Nagpur city, India. It was found that about 35% of the total traffic is diverted to the flyover, which results in a reduction of about 32% in the total emission generation. Travel on the flyover resulted in as much as 60-70% saving in time, compared to the travel on the main road, particularly when all the four signals are found to be in the red phase. The loss of fuel for combustion and the associated cost resulting from waiting for the signal to change are also estimated, and these are found to be significant.

  5. Reduction of capital costs of nuclear power plants

    International Nuclear Information System (INIS)

    2000-01-01

    The competitiveness of nuclear power plants depends largely on their capital costs represent some 60 per cent of their total generation costs. Reviewing and analysing ways and means to reduce capital costs of nuclear power plants are essential to enhance the economic viability of the nuclear option. The report is based upon cost information and data provided by experts from NEA Member countries. It investigates the efficiency of alternative methods for reducing capital costs of nuclear units. It will provide stakeholders from the industry and governmental agencies with relevant elements in support of policy making. (author)

  6. The BOS-X approach: achieving drastic cost reduction in CPV through holistic power plant level innovation

    Science.gov (United States)

    Plesniak, A.; Garboushian, V.

    2012-10-01

    In 2011, the Amonix Advanced Technology Group was awarded DOE SunShot funding in the amount of 4.5M to design a new Balance of System (BOS) architecture utilizing Amonix MegaModules™ focused on reaching the SunShot goal of 0.06-$0.08/kWhr LCOE. The project proposal presented a comprehensive re-evaluation of the cost components of a utility scale CPV plant and identified critical areas of focus where innovation is needed to achieve cost reduction. As the world's premier manufacturer and most experienced installer of CPV power plants, Amonix is uniquely qualified to lead a rethinking of BOS architecture for CPV. The presentation will focus on the structure of the BOS-X approach, which looks for the next wave of cost reduction in CPV through evaluation of non-module subsystems and the interaction between subsystems during the lifecycle of a solar power plant. Innovation around nonmodule components is minimal to date because CPV companies are just now getting enough practice through completion of large projects to create ideas and tests on how to improve baseline designs and processes. As CPV companies increase their installed capacity, they can utilize an approach similar to the methodology of BOS-X to increase the competitiveness of their product. Through partnership with DOE, this holistic approach is expected to define a path for CPV well aligned with the goals of the SunShot Initiative.

  7. Considerations in reviewing the waste volume reduction program in a large utility

    International Nuclear Information System (INIS)

    Kohout, R.; Calzolari, L.M.

    1987-01-01

    A program is underway at Ontario Hydro to establish a desirable future scheme for central processing/volume reduction of solid radioactive Low-Level Wastes (LLW) prior to their placement into the centralized storage, and in the future into a disposal facility. The approach being investigated is to furnish the current Waste Volume Reduction Facility (WVRF) with state-of-art processes, reclassify the waste categories and segregate the wastes such that each volume reduction (VR) process is then applied where it would be most effective. The ''optimized'' approach is then compared with other, specific schemes, which basically differ in that each scheme omits one of the major VR processes, thus allowing the next most effective process to take over its role. Each scheme is assessed quantitatively from the viewpoint of cost and VR effectiveness, and qualitatively from the viewpoint of resultant waste form. The economic assessments take into consideration the long term (20 year) impact of selected VR schemes on the overall waste management cost, including construction and operation of the storage facility. This paper highlights the overall study, includes the major results, and identifies aspects that need to be addressed in the selection of a desirable combination of VR processes in absence of knowledge of future waste disposal costs

  8. Synthesis on construction unit cost development : technical report.

    Science.gov (United States)

    2009-01-01

    Availability of historical unit cost data is an important factor in developing accurate project cost estimates. : State highway agencies (SHAs) collect data on historical bids and/or production rates, crew sizes and mixes, : material costs, and equip...

  9. The importance of marginal cost electricity pricing to the success of greenhouse gas reduction programs

    International Nuclear Information System (INIS)

    Friedman, Lee S.

    2011-01-01

    The efficient reduction of GHG emissions requires appropriate retail pricing of off-peak electricity. However, off-peak electricity for residential consumers is priced at 331% above its marginal cost in the United States as a whole (June 2009). Even for the 1% of residences that are on some form of time-of-use (TOU) rate schedule, the off-peak rate is almost three times higher than the marginal cost. A barrier to marginal-cost based TOU rates is that less than 9% of U.S. households have the 'smart' meters in place that can measure and record the time of consumption. Policies should be put in place to achieve full deployment. Another important barrier is consumer concern about TOU rate design. Two TOU rate designs (baseline and two-part tariff) are described that utilize marginal-cost based rates, ensure appropriate cost recovery, and minimize bill changes from current rate structures. A final barrier is to get residences on to these rates. Should a marginal-cost based TOU rate design remain an alternative for which residences could 'opt-in,' or become the default choice, or become mandatory? Time-invariant rates are a historical anachronism that subsidize very costly peak-period consumption and penalize off-peak usage to our environmental detriment. They should be phased out. - Highlights: → Off-peak electricity for residences is priced at 331% above marginal cost in the US. → This inefficiently deters vehicle electrification that could reduce GHG emissions. → 9% of U.S. households have the 'smart' meters necessary for time-of-use rates. → Time-invariant rates cause substantial environmental harm and should be phased out.

  10. Nuclear power plant construction activity, 1986

    International Nuclear Information System (INIS)

    1987-01-01

    Cost estimates, chronological data on construction progress, and the physical characteristics of nuclear units in commercial operation and units in the construction pipeline as of December 31, 1986, are presented. This report, which is updated annually, was prepared to provide an overview of the nuclear power plant construction industry. The report contains information on the status of nuclear generating units, average construction costs and lead-times, and construction milestones for individual reactors

  11. Workers' compensation loss prevention representative contact and risk of lost-time injury in construction policyholders.

    Science.gov (United States)

    Schofield, Katherine E; Alexander, Bruce H; Gerberich, Susan G; MacLehose, Richard F

    2017-09-01

    Insurance loss prevention (LP) representatives have access and contact with businesses and employees to provide targeted safety and health resources. Construction firms, especially those smaller in size, are a high-risk population. This research evaluated the association between LP rep contact and risk for lost-time injuries in construction policyholders. Workers' compensation data were utilized to track LP rep contact with policyholders and incidence of lost-time injury over time. Survival analysis with repeated events modeling calculated hazard ratios (HR) and 95% confidence intervals (CI). Compared no LP contact, one contact was associated with a 27% reduction of risk (HR=0.73, CI=0.65-0.82), two with a 41% (HR=0.59, CI=0.51-0.68), and three or more contacts with a 28% reduction of risk (HR=0.72, CI=0.65-0.81). LP reps appear to be a valuable partner in efforts to reduce injury burden. Their presence or contact with policyholders is consistent with reduction in overall incidence of lost-time injuries. Reduction in lost-time injuries, resulting in reduced workers' compensation costs for policyholders and insurance companies, builds a business-case for safety and injury prevention. LP reps are often a low or no-cost benefit for insurance policyholders and may be an important injury prevention resource for small firms and/or those with lack of safety resources and staff. Copyright © 2017 The Authors. Published by Elsevier Ltd.. All rights reserved.

  12. Using Purchasing Power Parity to Assess Construction Productivity

    Directory of Open Access Journals (Sweden)

    Rick Best

    2010-12-01

    Full Text Available For many reasons comparing construction productivity between countries is a difficult task. One key problem is that of converting construction costs to a common currency. This problem can be overcome relatively simply by using a basket of construction materials and labour, termed a BLOC (Basket of Locally Obtained Commodities, as a unit of construction cost. Average BLOC costs in each location are calculated from data obtained from a number of sources (quantity surveyors, estimators. Typical building costs obtained from published construction cost data are expressed in BLOC equivalents. Lower BLOC equivalents represent higher productivity as other inputs (largely materials are constant. The method provides a relatively simple and direct method for comparing productivity between different locations.

  13. CO2 substitution potential and CO2 reduction costs of an energetic exploitation of solid biomasses in Germany

    International Nuclear Information System (INIS)

    Becher, S.

    1995-01-01

    For the reduction of the anthropogenic greenhouse effect, the CO 2 , emissions are clearly to be reduced in future, according to the resolution made by the Federal Republic. Against the background of this objective, possible contributions of the biogenous solid fuels for the reduction of the CO 2 release of fossil origin are presented and discussed. For that, first the existing potentials of biomass in Germany and their present use are shown. Based on this, the CO 2 emissions by the present use already avoided, as well as the existing unexploited potentials of the CO 2 reduction potentials still to be exploited are determined. In accordance with an 'integral' starting point, thereby all pre- and post-positioned processes are considered. Finally, the specific CO 2 reduction costs are analysed and compared with other options. (orig.) [de

  14. Construction delays causing risks on time and cost - a critical review

    Directory of Open Access Journals (Sweden)

    Chidambaram Ramanathan

    2012-02-01

    Full Text Available There is an increase in the number of construction projects experiencing extensive delays leading to exceeding initial time and cost budget.  This paper reviews 41 studies around the world which surveyed the delay factors and classified them into Groups.  The main purpose of this paper is to review literature, each of which have categorized the causes that are responsible for time delays and cost overrun in projects. The collected list has 113 causes for delays categorized in to 18 different groups.  Most of the researches have analysed the responses from the Questionnaire survey.    The collected data are used to rank the problem.  The data are further used to investigate and analyse Important Index, Frequency Index, Severity Index, Relative Important Index, Relative Importance Weight, Weighted Average, Mean, Standard Deviation and Variance.  The collective comparison has revealed that the ranking given by all the researchers is not the same.  Further each and every study has different rank ratings for the different group of the delays.  This review paper attempts to provide an updated compilation of the earlier studies on ranking of the delay causers, which are never similar and constant for universal projects.  It is concluded that a separate study is required for identifying the factors causing delay for projects operated in Sabah, East Malaysia.

  15. The construction and operation of a low-cost poultry waste digester.

    Science.gov (United States)

    Steinsberger, S C; Shih, J C

    1984-05-01

    A simple and low-cost poultry waste digester (PWD) was constructed to treat the waste from 4000 caged laying hens on University Research Unit No. 2 at North Carolina State University. The system was built basically of a plastic lining with insulation, a heating system, a hot-water tank, and other metering equipment. It was operated at 50 degrees C and pH 7.5-8.0. The initiation of methane production was achieved using the indigenous microflora in the poultry waste. At an optimal loading rate (7.5 kg volatile solids/m(3) day), the PWD produced biogas (55% methane) at a rate of 4.0 m(3)/m(3) day. The PWD was biologically stable and able to tolerate temporary overloads and shutdowns. A higher loading rate failed to maintain a high gas production rate and caused drops in methane content and pH value. Under optimal conditions, a positive energy balance was demonstrated with a net surplus of 50.6% of the gross energy. For methane production, the PWD system was proved to be technically feasible. The simple design and inexpensive materials used for this model could significantly reduce the cost of digestion compared to more conventional systems. More studies are needed to determine the durability, the required maintenance of the system, and the most economical method of biogas and solid residue utilization.

  16. Life-cycle cost assessment of seismically base-isolated structures in nuclear power plants

    International Nuclear Information System (INIS)

    Wang, Hao; Weng, Dagen; Lu, Xilin; Lu, Liang

    2013-01-01

    Highlights: • The life-cycle cost of seismic base-isolated nuclear power plants is modeled. • The change law of life-cycle cost with seismic fortification intensity is studied. • The initial cost of laminated lead rubber bearings can be expressed as the function of volume. • The initial cost of a damper can be expressed as the function of its maximum displacement and tonnage. • The use of base-isolation can greatly reduce the expected damage cost, which leads to the reduction of the life-cycle cost. -- Abstract: Evaluation of seismically base-isolated structural life-cycle cost is the key problem in performance based seismic design. A method is being introduced to address the life-cycle cost of base-isolated reinforced concrete structures in nuclear power plants. Each composition of life-cycle cost is analyzed including the initial construction cost, the isolators cost and the excepted damage cost over life-cycle of the structure. The concept of seismic intensity is being used to estimate the expected damage cost, greatly simplifying the calculation. Moreover, French Cruas nuclear power plant is employed as an example to assess its life-cycle cost, compared to the cost of non-isolated plant at the same time. The results show that the proposed method is efficient and the expected damage cost is enormously reduced because of the application of isolators, which leads to the reduction of the life-cycle cost of nuclear power plants

  17. Cost-Reduction Roadmap for Residential Solar Photovoltaics (PV),

    Science.gov (United States)

    Office (SETO) residential 2030 photovoltaics (PV) cost target of $0.05 per kilowatt-hour by identifying could influence system costs in key market segments. This report examines two key market segments that demonstrate significant opportunities for cost savings and market growth: installing PV at the time of roof

  18. A low-cost, goal-oriented ‘compact proper orthogonal decomposition’ basis for model reduction of static systems

    KAUST Repository

    Carlberg, Kevin

    2010-12-10

    A novel model reduction technique for static systems is presented. The method is developed using a goal-oriented framework, and it extends the concept of snapshots for proper orthogonal decomposition (POD) to include (sensitivity) derivatives of the state with respect to system input parameters. The resulting reduced-order model generates accurate approximations due to its goal-oriented construction and the explicit \\'training\\' of the model for parameter changes. The model is less computationally expensive to construct than typical POD approaches, since efficient multiple right-hand side solvers can be used to compute the sensitivity derivatives. The effectiveness of the method is demonstrated on a parameterized aerospace structure problem. © 2010 John Wiley & Sons, Ltd.

  19. A low-cost, goal-oriented ‘compact proper orthogonal decomposition’ basis for model reduction of static systems

    KAUST Repository

    Carlberg, Kevin; Farhat, Charbel

    2010-01-01

    A novel model reduction technique for static systems is presented. The method is developed using a goal-oriented framework, and it extends the concept of snapshots for proper orthogonal decomposition (POD) to include (sensitivity) derivatives of the state with respect to system input parameters. The resulting reduced-order model generates accurate approximations due to its goal-oriented construction and the explicit 'training' of the model for parameter changes. The model is less computationally expensive to construct than typical POD approaches, since efficient multiple right-hand side solvers can be used to compute the sensitivity derivatives. The effectiveness of the method is demonstrated on a parameterized aerospace structure problem. © 2010 John Wiley & Sons, Ltd.

  20. A smart market for nutrient credit trading to incentivize wetland construction

    Science.gov (United States)

    Raffensperger, John F.; Prabodanie, R. A. Ranga; Kostel, Jill A.

    2017-03-01

    Nutrient trading and constructed wetlands are widely discussed solutions to reduce nutrient pollution. Nutrient markets usually include agricultural nonpoint sources and municipal and industrial point sources, but these markets rarely include investors who construct wetlands to sell nutrient reduction credits. We propose a new market design for trading nutrient credits, with both point source and non-point source traders, explicitly incorporating the option of landowners to build nutrient removal wetlands. The proposed trading program is designed as a smart market with centralized clearing, done with an optimization. The market design addresses the varying impacts of runoff over space and time, and the lumpiness of wetland investments. We simulated the market for the Big Bureau Creek watershed in north-central Illinois. We found that the proposed smart market would incentivize wetland construction by assuring reasonable payments for the ecosystem services provided. The proposed market mechanism selects wetland locations strategically taking into account both the cost and nutrient removal efficiencies. The centralized market produces locational prices that would incentivize farmers to reduce nutrients, which is voluntary. As we illustrate, wetland builders' participation in nutrient trading would enable the point sources and environmental organizations to buy low cost nutrient credits.