  1. Development of a simple estimation tool for LMFBR construction cost

    Energy Technology Data Exchange (ETDEWEB)

    Yoshida, Kazuo; Kinoshita, Izumi [Central Research Inst. of Electric Power Industry, Komae, Tokyo (Japan). Komae Research Lab

    1999-05-01

    A simple tool for estimating the construction costs of liquid-metal-cooled fast breeder reactors (LMFBRs), 'Simple Cost' was developed in this study. Simple Cost is based on a new estimation formula that can reduce the amount of design data required to estimate construction costs. Consequently, Simple cost can be used to estimate the construction costs of innovative LMFBR concepts for which detailed design has not been carried out. The results of test calculation show that Simple Cost provides cost estimations equivalent to those obtained with conventional methods within the range of plant power from 325 to 1500 MWe. Sensitivity analyses for typical design parameters were conducted using Simple Cost. The effects of four major parameters - reactor vessel diameter, core outlet temperature, sodium handling area and number of secondary loops - on the construction costs of LMFBRs were evaluated quantitatively. The results show that the reduction of sodium handling area is particularly effective in reducing construction costs. (author)

  2. A Semantics-Based Approach to Construction Cost Estimating

    Science.gov (United States)

    Niknam, Mehrdad

    2015-01-01

    A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…

  3. A Semantics-Based Approach to Construction Cost Estimating

    Science.gov (United States)

    Niknam, Mehrdad

    2015-01-01

    A construction project requires collaboration of different organizations such as owner, designer, contractor, and resource suppliers. These organizations need to exchange information to improve their teamwork. Understanding the information created in other organizations requires specialized human resources. Construction cost estimating is one of…

  4. BIM-Based Cost Estimation/ Monitoring For Building Construction

    Directory of Open Access Journals (Sweden)

    Emad Elbeltagi

    2014-07-01

    Full Text Available Proper Cost Estimate, Monitor and Control (CEM&C are vital for the success of construction projects. Starting from preliminary design to project closing, CEM&C progressively becomes more complex and challenging. Visualization can add another dimension to monitor and control where major deviations can be visually detected and analyzed. However, literature related to visualization in construction and integrating it with cost control is still in its early stages. Building Information Modeling (BIM can have promising impact in that domain. In this paper, a comprehensive cost estimating and monitoring model is presented. The model is integrated with BIM to provide the user with the capability of visualizing actual cost expended in different building elements and compare it with that budgeted at different time intervals. It provides construction practitioners with vital data that help them in taking appropriate corrective actions in case of any deviation from the budget. An example application is presented to demonstrate the capability and applicability of the model.

  5. Ontology-Based Representation and Reasoning in Building Construction Cost Estimation in China

    OpenAIRE

    Xin Liu; Zhongfu Li; Shaohua Jiang

    2016-01-01

    Cost estimation is one of the most critical tasks for building construction project management. The existing building construction cost estimation methods of many countries, including China, require information from several sources, including material, labor, and equipment, and tend to be manual, time-consuming, and error-prone. To solve these problems, a building construction cost estimation model based on ontology representation and reasoning is established, which includes three major compo...

  6. Construction Cost Estimates for Residences in Spain: practical application of the Pcr.5n model

    OpenAIRE

    Pina Ruiz, Pedro; García Erviti, Federico; Ramírez Pacheco, Gema María

    2013-01-01

    The construction cost estimation systems in Spain are undeveloped and, hence, infrequently used by technicians and professionals in the building sector. However, estimation of an approximate real cost prior to the execution of the work is compulsory under current legal regulations (Technical Building Code). Therefore, the development of research projects on construction cost estimation models such as the one described and demonstrated in this talk is extremely interesting.

  7. VA Construction: Improved Processes Needed to Monitor Contract Modifications, Develop Schedules, and Estimate Costs

    Science.gov (United States)

    2017-03-01

    that designs should avoid costly and unwarranted architectural and engineering embellishments and unnecessary construction and maintenance expenses ...relevant data taken from the existing contract, remaining construction work, and cost information from other hospitals . Credible A cost estimate is...Office of Management and Budget Circular A-11 states that the cost of a capital asset such as a new hospital is its full life-cycle cost, which

  8. Ontology-Based Representation and Reasoning in Building Construction Cost Estimation in China

    Directory of Open Access Journals (Sweden)

    Xin Liu

    2016-08-01

    Full Text Available Cost estimation is one of the most critical tasks for building construction project management. The existing building construction cost estimation methods of many countries, including China, require information from several sources, including material, labor, and equipment, and tend to be manual, time-consuming, and error-prone. To solve these problems, a building construction cost estimation model based on ontology representation and reasoning is established, which includes three major components, i.e., concept model ontology, work item ontology, and construction condition ontology. Using this model, the cost estimation information is modeled into OWL axioms and SWRL rules that leverage the semantically rich ontology representation to reason about cost estimation. Based on OWL axioms and SWRL rules, the cost estimation information can be translated into a set of concept models, work items, and construction conditions associated with the specific construction conditions. The proposed method is demonstrated in Protégé 3.4.8 through case studies based on the Measurement Specifications of Building Construction and Decoration Engineering taken from GB 50500-2013 (the Chinese national mandatory specifications. Finally, this research discusses the limitations of the proposed method and future research directions. The proposed method can help a building construction cost estimator extract information more easily and quickly.

  9. Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey

    Directory of Open Access Journals (Sweden)

    Abdelrahman Osman Elfaki

    2014-01-01

    Full Text Available Cost estimation is the most important preliminary process in any construction project. Therefore, construction cost estimation has the lion’s share of the research effort in construction management. In this paper, we have analysed and studied proposals for construction cost estimation for the last 10 years. To implement this survey, we have proposed and applied a methodology that consists of two parts. The first part concerns data collection, for which we have chosen special journals as sources for the surveyed proposals. The second part concerns the analysis of the proposals. To analyse each proposal, the following four questions have been set. Which intelligent technique is used? How have data been collected? How are the results validated? And which construction cost estimation factors have been used? From the results of this survey, two main contributions have been produced. The first contribution is the defining of the research gap in this area, which has not been fully covered by previous proposals of construction cost estimation. The second contribution of this survey is the proposal and highlighting of future directions for forthcoming proposals, aimed ultimately at finding the optimal construction cost estimation. Moreover, we consider the second part of our methodology as one of our contributions in this paper. This methodology has been proposed as a standard benchmark for construction cost estimation proposals.

  10. A Neural Network Model for Construction Projects Site Overhead Cost Estimating in Egypt

    CERN Document Server

    ElSawy, Ismaail; Razek, Mohammed Abdel

    2011-01-01

    Estimating of the overhead costs of building construction projects is an important task in the management of these projects. The quality of construction management depends heavily on their accurate cost estimation. Construction costs prediction is a very difficult and sophisticated task especially when using manual calculation methods. This paper uses Artificial Neural Network (ANN) approach to develop a parametric cost-estimating model for site overhead cost in Egypt. Fifty-two actual real-life cases of building projects constructed in Egypt during the seven year period 2002-2009 were used as training materials. The neural network architecture is presented for the estimation of the site overhead costs as a percentage from the total project price.

  11. The effect of construction cost estimating (CCE software on job performance: An improvement plan

    Directory of Open Access Journals (Sweden)

    Mohd Mukelas M.F.

    2014-01-01

    Full Text Available This paper presents a comprehensive statistical research on the effect of construction cost estimating software’s features towards estimating job performance. The objectives of this study are identification of cost estimating software features, analyzing the significant relation of cost estimating software’s features towards job performance, Explore the problem faced during the implementation and lastly propose a plan to improve the cost estimating software usage among contractors in Malaysia. The study statistically reveals four features of cost estimating software that significantly impact towards changes in cost estimating job performance. These features were refined by performing interview to focus group of respondent to observe the actual possible problems during the implementation. Eventually, the proposed improvement plan was validated by the focus group of respondents to enhance the cost estimating software implementation among contractors in Malaysia.

  12. Risk Consideration and Cost Estimation in Construction Projects Using Monte Carlo Simulation

    Directory of Open Access Journals (Sweden)

    Claudius A. Peleskei

    2015-06-01

    Full Text Available Construction projects usually involve high investments. It is, therefore, a risky adventure for companies as actual costs of construction projects nearly always exceed the planed scenario. This is due to the various risks and the large uncertainty existing within this industry. Determination and quantification of risks and their impact on project costs within the construction industry is described to be one of the most difficult areas. This paper analyses how the cost of construction projects can be estimated using Monte Carlo Simulation. It investigates if the different cost elements in a construction project follow a specific probability distribution. The research examines the effect of correlation between different project costs on the result of the Monte Carlo Simulation. The paper finds out that Monte Carlo Simulation can be a helpful tool for risk managers and can be used for cost estimation of construction projects. The research has shown that cost distributions are positively skewed and cost elements seem to have some interdependent relationships.

  13. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects.

    Science.gov (United States)

    Shin, Yoonseok

    2015-01-01

    Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN) model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  14. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    Directory of Open Access Journals (Sweden)

    Yoonseok Shin

    2015-01-01

    Full Text Available Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT is applied to cost estimations at the early stage of a construction project to examine the applicability of the boosting approach to a regression problem within the construction domain. To evaluate the performance of the BRT model, its performance was compared with that of a neural network (NN model, which has been proven to have a high performance in cost estimation domains. The BRT model has shown results similar to those of NN model using 234 actual cost datasets of a building construction project. In addition, the BRT model can provide additional information such as the importance plot and structure model, which can support estimators in comprehending the decision making process. Consequently, the boosting approach has potential applicability in preliminary cost estimations in a building construction project.

  15. Application of Boosting Regression Trees to Preliminary Cost Estimation in Building Construction Projects

    OpenAIRE

    Yoonseok Shin

    2015-01-01

    Among the recent data mining techniques available, the boosting approach has attracted a great deal of attention because of its effective learning algorithm and strong boundaries in terms of its generalization performance. However, the boosting approach has yet to be used in regression problems within the construction domain, including cost estimations, but has been actively utilized in other domains. Therefore, a boosting regression tree (BRT) is applied to cost estimations at the early stag...

  16. Accounting for the inaccuracies in demand forecasts and construction cost estimations in transport project evaluation

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    2014-01-01

    For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs and overesti......For decades researchers have claimedthat particularly demand forecasts and construction cost estimations are assigned with/affected by a large degree of uncertainty. Massively, articles,research documents and reports agree that there exists a tendencytowards underestimating the costs...... and overestimating the demand for transport infrastructure projects. It is therefore claimed that ex-anteevaluations of trans- port-related projects are often based on inaccurate material, which ultimately can lead to severe socio- economic misperformance. This paper seeks to bridge the gap between the inaccuracies...... in demand and cost estimations and hence the evaluation of transport infrastructure projects. Currently, research within this area is scarce and scattered with no commonagreement on how to embed and operationalise the huge amount of empiricaldata that exist within the frame of Optimism Bias. Therefore...

  17. Artificial neural networks incorporating cost significant Items towards enhancing estimation for (life-cycle costing of construction projects

    Directory of Open Access Journals (Sweden)

    Ayedh Alqahtani

    2013-09-01

    Full Text Available Industrial application of life-cycle cost analysis (LCCA is somewhat limited, with techniques deemed overly theoretical, resulting in a reluctance to realise (and pass onto the client the advantages to be gained from objective (LCCA comparison of (subcomponent material specifications. To address the need for a user-friendly structured approach to facilitate complex processing, the work described here develops a new, accessible framework for LCCA of construction projects; it acknowledges Artificial Neural Networks (ANNs to compute the whole-cost(s of construction and uses the concept of cost significant items (CSI to identify the main cost factors affecting the accuracy of estimation. ANNs is a powerful means to handle non-linear problems and subsequently map between complex input/output data, address uncertainties. A case study documenting 20 building projects was used to test the framework and estimate total running costs accurately. Two methods were used to develop a neural network model; firstly a back-propagation method was adopted (using MATLAB SOFTWARE; and secondly, spread-sheet optimisation was conducted (using Microsoft Excel Solver. The best network was established as consisting of 19 hidden nodes, with the tangent sigmoid used as a transfer function of NNs model for both methods. The results find that in both neural network models, the accuracy of the developed NNs model is 1% (via Excel-solver and 2% (via back-propagation respectively.

  18. Early cost estimating for road construction projects using multiple regression techniques

    Directory of Open Access Journals (Sweden)

    Ibrahim Mahamid

    2011-12-01

    Full Text Available The objective of this study is to develop early cost estimating models for road construction projects using multiple regression techniques, based on 131 sets of data collected in the West Bank in Palestine. As the cost estimates are required at early stages of a project, considerations were given to the fact that the input data for the required regression model could be easily extracted from sketches or scope definition of the project. 11 regression models are developed to estimate the total cost of road construction project in US dollar; 5 of them include bid quantities as input variables and 6 include road length and road width. The coefficient of determination r2 for the developed models is ranging from 0.92 to 0.98 which indicate that the predicted values from a forecast models fit with the real-life data. The values of the mean absolute percentage error (MAPE of the developed regression models are ranging from 13% to 31%, the results compare favorably with past researches which have shown that the estimate accuracy in the early stages of a project is between ±25% and ±50%.

  19. A fuzzy neural network to estimate at completion costs of construction projects

    Directory of Open Access Journals (Sweden)

    Morteza Bagherpour

    2012-04-01

    Full Text Available In construction cost management system, normally earned value management (EVM is applied as an efficient control approach in both status detection and estimation at completion (EAC cost forecasting. The traditional approaches in EAC predictions normally extend the current situation of a project to the future by employing pervious performance factor. The proposed approach of this paper considers both qualitative and quantitative factors affecting the EAC prediction. The proposed approach of this research not only estimates the completion of the project, but also it can generate accurate forecast for the entire future periods using a fuzzy neural network model. The model is also implemented for a real-world case study and yields encouraging preliminary results.

  20. Utilization of BIM for automation of quantity takeoffs and cost estimation in transport infrastructure construction projects in the Czech Republic

    Science.gov (United States)

    Vitásek, Stanislav; Matějka, Petr

    2017-09-01

    The article deals with problematic parts of automated processing of quantity takeoff (QTO) from data generated in BIM model. It focuses on models of road constructions, and uses volumes and dimensions of excavation work to create an estimate of construction costs. The article uses a case study and explorative methods to discuss possibilities and problems of data transfer from a model to a price system of construction production when such transfer is used for price estimates of construction works. Current QTOs and price tenders are made with 2D documents. This process is becoming obsolete because more modern tools can be used. The BIM phenomenon enables partial automation in processing volumes and dimensions of construction units and matching the data to units in a given price scheme. Therefore price of construction can be estimated and structured without lengthy and often imprecise manual calculations. The use of BIM for QTO is highly dependent on local market budgeting systems, therefore proper push/pull strategy is required. It also requires proper requirements specification, compatible pricing database and software.

  1. On the Estimate Method of Construction Engineering Cost Based on the RS-GA-NNA Model

    Directory of Open Access Journals (Sweden)

    Xie Zheng

    2012-07-01

    Full Text Available Given the low intelligent level and the low accuracy of valuation of civil architecture projects, we put forward in the study a constructional engineering assessment method based on Artificial Intelligence which taking advantage of data-calculation from rough set theory, genetic algorithm and neural network algorithm. First, the rough set theory is used to reduce the discrete attributes to optimize the input variables of BP neural network. And then use the global search feature of genetic algorithm to optimize the initial weight and the threshold value of BP neural network. The new algorithm covers both the global random search capability of genetic algorithm and the learning ability and robustness of neural network, thus the computational speed and accuracy have been more significantly improved than the traditional methods. To empirically analyze a case selected from a city in Hunan Province, the results show that the new algorithm model can rely on the engineering features, assess the construction costs scientifically and objectively and have high practical value.

  2. Software Cost Estimation Review

    OpenAIRE

    Ongere, Alphonce

    2013-01-01

    Software cost estimation is the process of predicting the effort, the time and the cost re-quired to complete software project successfully. It involves size measurement of the soft-ware project to be produced, estimating and allocating the effort, drawing the project schedules, and finally, estimating overall cost of the project. Accurate estimation of software project cost is an important factor for business and the welfare of software organization in general. If cost and effort estimat...

  3. Bridging the Gap in Transport Project Evaluation: Accounting for the Inaccuracies in Demand Forecasts and Construction Costs Estimations

    DEFF Research Database (Denmark)

    Salling, Kim Bang; Leleur, Steen

    For decades researchers have claimed that demand forecasts and construction costs estimations are assigned with large degrees of uncertainty, commonly referred to as Optimism Bias. A severe consequence is that ex-ante socio-economic evaluation of infrastructure projects becomes inaccurate and can...... lead to unsatisfactory investment decisions. Thus there is a need for better risk assessment and decision support, which is addressed by the recently developed UNITE-DSS model. It is argued that this simulation-based model can offer decision makers new and better ways to deal with risk assessment....

  4. Cost function estimation

    DEFF Research Database (Denmark)

    Andersen, C K; Andersen, K; Kragh-Sørensen, P

    2000-01-01

    on these criteria, a two-part model was chosen. In this model, the probability of incurring any costs was estimated using a logistic regression, while the level of the costs was estimated in the second part of the model. The choice of model had a substantial impact on the predicted health care costs, e......Statistical analysis of cost data is often difficult because of highly skewed data resulting from a few patients who incur high costs relative to the majority of patients. When the objective is to predict the cost for an individual patient, the literature suggests that one should choose...... a regression model based on the quality of its predictions. In exploring the econometric issues, the objective of this study was to estimate a cost function in order to estimate the annual health care cost of dementia. Using different models, health care costs were regressed on the degree of dementia, sex, age...

  5. Cost function estimation

    DEFF Research Database (Denmark)

    Andersen, C K; Andersen, K; Kragh-Sørensen, P

    2000-01-01

    Statistical analysis of cost data is often difficult because of highly skewed data resulting from a few patients who incur high costs relative to the majority of patients. When the objective is to predict the cost for an individual patient, the literature suggests that one should choose...... a regression model based on the quality of its predictions. In exploring the econometric issues, the objective of this study was to estimate a cost function in order to estimate the annual health care cost of dementia. Using different models, health care costs were regressed on the degree of dementia, sex, age......, marital status and presence of any co-morbidity other than dementia. Models with a log-transformed dependent variable, where predicted health care costs were re-transformed to the unlogged original scale by multiplying the exponential of the expected response on the log-scale with the average...

  6. Software cost estimation

    NARCIS (Netherlands)

    Heemstra, F.J.

    1992-01-01

    The paper gives an overview of the state of the art of software cost estimation (SCE). The main questions to be answered in the paper are: (1) What are the reasons for overruns of budgets and planned durations? (2) What are the prerequisites for estimating? (3) How can software development effort be

  7. Cost and schedule estimate to construct the tunnel and shaft remedial shielding concept, Los Alamos Meson Physics Facility, Los Alamos National Laboratory, Los Alamos, New Mexico. Final report

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1993-11-30

    The report provides an estimate of the cost and associated schedule to construct the tunnel and shaft remedial shielding concept. The cost and schedule estimate is based on a preliminary concept intended to address the potential radiation effects on Line D and Line Facilities in event of a beam spill. The construction approach utilizes careful tunneling methods based on available excavation and ground support technology. The tunneling rates and overall productivity on which the cost and project schedule are estimated are based on conservative assumptions with appropriate contingencies to address the uncertainty associated with geological conditions. The report is intended to provide supplemental information which will assist in assessing the feasibility of the tunnel and shaft concept and justification for future development of this particular aspect of remedial shielding for Line D and Line D Facilities.

  8. Construction Cost Prediction by Using Building Information Modeling

    National Research Council Canada - National Science Library

    Remon F. Aziz

    2015-01-01

    The increased interest in using Building Information Modeling (BIM) in detailed construction cost estimates calls for methodologies to evaluate the effectiveness of BIM-Assisted Detailed Estimating (BADE...

  9. Forecast Models for Estimating Construction Cost of Box Steel Column%钢结构箱型柱施工费用预估模式的研究

    Institute of Scientific and Technical Information of China (English)

    徐凌; 吕录娜; 邓光莲

    2016-01-01

    过去钢构制作进度预估及成本估价皆为经验法,导致施工进程须依个案加以规划。本研究利用施工现场生产力数据与影响因子,希望能建置一套施工费用预估模式。研究结果发现箱型柱制作作业具有高度重复及线性循环等特性。因此,本研究以线性回归方法建置钢结构箱型柱作业生产力预估模型。由于建置施工费用预估模式能够规划有效进程、方便管控预算成本及控制施工成本,因此可供钢结构厂预估最佳工期与成本,以减少预算损失[1]。%In the past, steel production cost and progress prediction are empirical method, leading to the construction process in accordance with the case of planning. The construction site and the influence factor of productivity data are used in this study, hoping to establish a prediction model of construction cost. The research results show that the production operation of box column has the characteristics of high repetition and linear cycle. Therefore, based on the linear regression method, this study builds the steel box column work productivity prediction model. Because the implementation of construction cost estimate model can effectively plan the process, conveniently control the budget and the construction cost, it can be used to estimate optimum duration and cost for steel structure factory in order to reduce the loss budget.

  10. Sequential Construction of Costly Networks

    Energy Technology Data Exchange (ETDEWEB)

    Gutfraind, Alexander [Los Alamos National Laboratory

    2011-01-01

    Natural disasters or attacks often disrupt infrastructure networks requiring a costly recovery. This motivates an optimization problem where the objecitve is to construct the nodes of a graph G(V;E), and the cost of each node is dependent on the number of its neighbors previously constructed, or more generally, any properties of the previously-completed subgraph. In this optimization problem the objective is to find a permutation of the nodes which results in the least construction cost. We prove that in the case where the cost of nodes is a convex function in the number of neighbors, the optimal construction sequence is to start at a single node and move outwards. We also introduce algorithms and heuristics for solving various instances of the problem. Those methods can be applied to help reduce the cost of recovering from disasters as well as to plan the deployment of new network infrastructure.

  11. Software Development Cost Estimation Methods

    Directory of Open Access Journals (Sweden)

    Bogdan Stepien

    2003-01-01

    Full Text Available Early estimation of project size and completion time is essential for successful project planning and tracking. Multiple methods have been proposed to estimate software size and cost parameters. Suitability of the estimation methods depends on many factors like software application domain, product complexity, availability of historical data, team expertise etc. Most common and widely used estimation techniques are described and analyzed. Current research trends in software estimation cost are also presented.

  12. Cost Estimation CFM

    Data.gov (United States)

    Department of Veterans Affairs — This site provides guides and other resoruces to help sites archive the goal of managing and executing a construction project within the funding limit approved by...

  13. 25 CFR 700.467 - Construction costs.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...

  14. Data Service Provider Cost Estimation Tool

    Science.gov (United States)

    Fontaine, Kathy; Hunolt, Greg; Booth, Arthur L.; Banks, Mel

    2011-01-01

    The Data Service Provider Cost Estimation Tool (CET) and Comparables Database (CDB) package provides to NASA s Earth Science Enterprise (ESE) the ability to estimate the full range of year-by-year lifecycle cost estimates for the implementation and operation of data service providers required by ESE to support its science and applications programs. The CET can make estimates dealing with staffing costs, supplies, facility costs, network services, hardware and maintenance, commercial off-the-shelf (COTS) software licenses, software development and sustaining engineering, and the changes in costs that result from changes in workload. Data Service Providers may be stand-alone or embedded in flight projects, field campaigns, research or applications projects, or other activities. The CET and CDB package employs a cost-estimation-by-analogy approach. It is based on a new, general data service provider reference model that provides a framework for construction of a database by describing existing data service providers that are analogs (or comparables) to planned, new ESE data service providers. The CET implements the staff effort and cost estimation algorithms that access the CDB and generates the lifecycle cost estimate for a new data services provider. This data creates a common basis for an ESE proposal evaluator for considering projected data service provider costs.

  15. Acquisition Cost/Price Estimating

    Science.gov (United States)

    1981-01-01

    REVIEW AND VALIDATION, (3) RESEARCH AND METHODOLOGY AND (4) DATA ANALYSIS. THESE FUNCTIONAL THRUSTS ARE IN TURN FOCUSED TO ESTIMATING AND ANALISIS ...ANALYSIS OF COST ISSUES -- TO PROVIDE CONSISTENCY AND COMPLETENESS OF ESTIMATES PREPARED BY OTHER FUNCTIONAL ACTIVITIES. MANAGERIAL 1. COST ANALISIS HAS

  16. Construction Cost Growth for New Department of Energy Nuclear Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Kubic, Jr., William L. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2014-05-25

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facility (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.

  17. The Psychology of Cost Estimating

    Science.gov (United States)

    Price, Andy

    2016-01-01

    Cost estimation for large (and even not so large) government programs is a challenge. The number and magnitude of cost overruns associated with large Department of Defense (DoD) and National Aeronautics and Space Administration (NASA) programs highlight the difficulties in developing and promulgating accurate cost estimates. These overruns can be the result of inadequate technology readiness or requirements definition, the whims of politicians or government bureaucrats, or even as failures of the cost estimating profession itself. However, there may be another reason for cost overruns that is right in front of us, but only recently have we begun to grasp it: the fact that cost estimators and their customers are human. The last 70+ years of research into human psychology and behavioral economics have yielded amazing findings into how we humans process and use information to make judgments and decisions. What these scientists have uncovered is surprising: humans are often irrational and illogical beings, making decisions based on factors such as emotion and perception, rather than facts and data. These built-in biases to our thinking directly affect how we develop our cost estimates and how those cost estimates are used. We cost estimators can use this knowledge of biases to improve our cost estimates and also to improve how we communicate and work with our customers. By understanding how our customers think, and more importantly, why they think the way they do, we can have more productive relationships and greater influence. By using psychology to our advantage, we can more effectively help the decision maker and our organizations make fact-based decisions.

  18. Tunnel Cost-Estimating Methods.

    Science.gov (United States)

    1981-10-01

    8 ae1e 066 c LINING CALCULATES THE LINING COSTS AND THE FORMWORK COST FOR A 982928 ees C TUNNEL OR SHAFT SEGMENT 682636 0066...AD-AIO . 890 ARMY ENGINEER WATERWAYS EXPERIMENT STATION VICKSBURGETC F/B 13/13 TUNNEL COST-ESTIMATING METNDS(U) OCT 81 R D BENNETT UNCLASSIFIED WES...TR/L-81-101-3lEEEEEE EIIIl-IIIIIIIu IIIIEIIIEIIIIE llllEEEEllEEEI EEEEEEEEEIIII C EllTE-CHNICAL RGPORT GL-81-10 LI10 TUNNEL COST-ESTIMATING METHODS by

  19. On the weak project construction cost management

    Institute of Scientific and Technical Information of China (English)

    高守刚; 姜婧; 李玲

    2013-01-01

    the weak cost management is the most talked about topics in the weak industry, but also the basis of the weak construction business management and focus. With the increasingly fierce market competition, weak construction enterprises, the competition among enterprises wil gradual y transition from product quality competition to price competition. To strengthen the management of the weak construction enterprises cost, cut public spending ef iciency, improve market competitiveness, wil be the main way most weak construction corporate earnings and long-term business strategy. Based on the to weak project construction cost management based on analysis of the type of project construction costs, and further proposed the weak project construction cost management measures.

  20. Analysis of Cost Estimates in the Construction of Railway Bridge Project%铁路桥梁工程施工成本测算的分析研究

    Institute of Scientific and Technical Information of China (English)

    裴爱丽

    2014-01-01

    本文主要结合实际工程经验就铁路桥梁工程施工的成本构成、影响施工成本的相关因素以及施工成本的具体测算作了进一步地分析和探讨。%Combined with practical engineering experience, this paper makes a further analysis and discussion of the com-position of construction cost, the related factors influencing the construction cost and the detailed estimates of construction cost in railway bridge engineering.

  1. Guideline to Estimate Decommissioning Costs

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Kim, Younggook; Oh, Jaeyoung [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    The primary objective of this work is to provide guidelines to estimate the decommissioning cost as well as the stakeholders with plausible information to understand the decommissioning activities in a reasonable manner, which eventually contribute to acquiring the public acceptance for the nuclear power industry. Although several cases of the decommissioning cost estimate have been made for a few commercial nuclear power plants, the different technical, site-specific and economic assumptions used make it difficult to interpret those cost estimates and compare them with that of a relevant plant. Trustworthy cost estimates are crucial to plan a safe and economic decommissioning project. The typical approach is to break down the decommissioning project into a series of discrete and measurable work activities. Although plant specific differences derived from the economic and technical assumptions make a licensee difficult to estimate reliable decommissioning costs, estimating decommissioning costs is the most crucial processes since it encompasses all the spectrum of activities from the planning to the final evaluation on whether a decommissioning project has successfully been preceded from the perspective of safety and economic points. Hence, it is clear that tenacious efforts should be needed to successfully perform the decommissioning project.

  2. Statistical methods of estimating mining costs

    Science.gov (United States)

    Long, K.R.

    2011-01-01

    Until it was defunded in 1995, the U.S. Bureau of Mines maintained a Cost Estimating System (CES) for prefeasibility-type economic evaluations of mineral deposits and estimating costs at producing and non-producing mines. This system had a significant role in mineral resource assessments to estimate costs of developing and operating known mineral deposits and predicted undiscovered deposits. For legal reasons, the U.S. Geological Survey cannot update and maintain CES. Instead, statistical tools are under development to estimate mining costs from basic properties of mineral deposits such as tonnage, grade, mineralogy, depth, strip ratio, distance from infrastructure, rock strength, and work index. The first step was to reestimate "Taylor's Rule" which relates operating rate to available ore tonnage. The second step was to estimate statistical models of capital and operating costs for open pit porphyry copper mines with flotation concentrators. For a sample of 27 proposed porphyry copper projects, capital costs can be estimated from three variables: mineral processing rate, strip ratio, and distance from nearest railroad before mine construction began. Of all the variables tested, operating costs were found to be significantly correlated only with strip ratio.

  3. 874 CONSTRUCTION COST MODELS FOR HIGHRISE OFFICE ...

    African Journals Online (AJOL)

    USER

    2015-10-28

    Oct 28, 2015 ... Ethiopian Journal of Environmental Studies & Management 8(Suppl. 2): 874 – 880, 2015. ... Key Words: Cost, Highrise, Models, Nigeria, Office, Construction. Introduction .... the modern trend in cost analysis and cost planning ...

  4. Cost analysis of continuous flight auger piles construction in Egypt

    Directory of Open Access Journals (Sweden)

    Hossam E. Hosny

    2016-09-01

    Full Text Available Continuous Flight Auger (CFA piling is widely used in the Egyptian construction industry. There is a dramatic fluctuation in pricing of executing this work package within short periods as a result of unsteady changes in supply-demand equilibrium. Consequently, there is an urgent need for the use of a scientific approach in estimating construction costs. Accordingly, it is crucial to consider the different cost elements of CFA piling construction as a step to reach an accurate and realistic cost estimate to be used by contractors in tendering. This research aims to study these cost elements based on an expert judgment, site observations and statistical analysis in order to develop an effective tool to estimate the total construction cost of the CFA piles in any future project. Expert survey was performed to draw detailed information to construct a cost breakdown structure (CBS that was used as a basis for developing the proposed cost model. The developed cost model is then validated through the application on fifty two projects. Such projects were carefully selected in different sizes, purposes and locations. Then the collected data were exposed to statistical analysis techniques. An average percentage error of 4.1% was observed upon comparing the estimated costs with the actual costs of these projects. A sensitivity analysis was then performed to recognize the most effective cost factors. The developed recommended model was used by some experienced contractors in the Egyptian market who expressed their satisfaction with the model.

  5. Factors influencing cost over-run in Indian construction projects

    Directory of Open Access Journals (Sweden)

    Cindrela Devi A.

    2017-01-01

    Full Text Available Construction cost is the most important criteria of project success and hence the construction project performance is generally expressed in terms of cost and its variance from the budget. In spite of having extant literature, cost estimation methods, cost indices etc., construction projects rarely meet the budgeted cost. This research study focuses on the construction cost overrun and to identify the various factors that affects the construction cost performance. Based on an extensive literature review and input from industry experts, sixty eight factors that causes cost overrun were identified for investigation. Further, a structured questionnaire survey was conducted among the industry experts and the collected data has been analysed statistically. It is concluded that the factors namely scope creep, construction delays, rework and practise of awarding the contract to the lowest bidder are most significant factors for construction cost overrun in non-infrastructural Indian projects. The relative importance of the listed factors used to guide the project team in addressing the cost related risks involved in the projects. The findings are expected to bridge the gap in the current construction cost management practices.

  6. CONSTRUCTING ACCOUNTING UNCERTAINITY ESTIMATES VARIABLE

    OpenAIRE

    Nino Serdarevic

    2012-01-01

    This paper presents research results on the BIH firms’ financial reporting quality, utilizing empirical relation between accounting conservatism, generated in created critical accounting policy choices, and management abilities in estimates and prediction power of domicile private sector accounting. Primary research is conducted based on firms’ financial statements, constructing CAPCBIH (Critical Accounting Policy Choices relevant in B&H) variable that presents particular internal control sys...

  7. Cost Estimates and Investment Decisions

    Energy Technology Data Exchange (ETDEWEB)

    Emhjellen, Kjetil; Emhjellen Magne; Osmundsen, Petter

    2001-08-01

    When evaluating new investment projects, oil companies traditionally use the discounted cashflow method. This method requires expected cashflows in the numerator and a risk adjusted required rate of return in the denominator in order to calculate net present value. The capital expenditure (CAPEX) of a project is one of the major cashflows used to calculate net present value. Usually the CAPEX is given by a single cost figure, with some indication of its probability distribution. In the oil industry and many other industries, it is common practice to report a CAPEX that is the estimated 50/50 (median) CAPEX instead of the estimated expected (expected value) CAPEX. In this article we demonstrate how the practice of using a 50/50 (median) CAPEX, when the cost distributions are asymmetric, causes project valuation errors and therefore may lead to wrong investment decisions with acceptance of projects that have negative net present values. (author)

  8. Costs of occupational injuries in construction in the United States.

    Science.gov (United States)

    Waehrer, Geetha M; Dong, Xiuwen S; Miller, Ted; Haile, Elizabeth; Men, Yurong

    2007-11-01

    This paper presents costs of fatal and nonfatal injuries for the construction industry using 2002 national incidence data from the Bureau of Labor Statistics and a comprehensive cost model that includes direct medical costs, indirect losses in wage and household productivity, as well as an estimate of the quality of life costs due to injury. Costs are presented at the three-digit industry level, by worker characteristics, and by detailed source and event of injury. The total costs of fatal and nonfatal injuries in the construction industry were estimated at $11.5 billion in 2002, 15% of the costs for all private industry. The average cost per case of fatal or nonfatal injury is $27,000 in construction, almost double the per-case cost of $15,000 for all industry in 2002. Five industries accounted for over half the industry's total fatal and nonfatal injury costs. They were miscellaneous special trade contractors (SIC 179), followed by plumbing, heating and air-conditioning (SIC 171), electrical work (SIC 173), heavy construction except highway (SIC 162), and residential building construction (SIC 152), each with over $1 billion in costs.

  9. Estimating the Costs of Preventive Interventions

    Science.gov (United States)

    Foster, E. Michael; Porter, Michele M.; Ayers, Tim S.; Kaplan, Debra L.; Sandler, Irwin

    2007-01-01

    The goal of this article is to improve the practice and reporting of cost estimates of prevention programs. It reviews the steps in estimating the costs of an intervention and the principles that should guide estimation. The authors then review prior efforts to estimate intervention costs using a sample of well-known but diverse studies. Finally,…

  10. Estimating the Costs of Preventive Interventions

    Science.gov (United States)

    Foster, E. Michael; Porter, Michele M.; Ayers, Tim S.; Kaplan, Debra L.; Sandler, Irwin

    2007-01-01

    The goal of this article is to improve the practice and reporting of cost estimates of prevention programs. It reviews the steps in estimating the costs of an intervention and the principles that should guide estimation. The authors then review prior efforts to estimate intervention costs using a sample of well-known but diverse studies. Finally,…

  11. 40 CFR 261.142 - Cost estimate.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Cost estimate. 261.142 Section 261.142... Materials § 261.142 Cost estimate. (a) The owner or operator must have a detailed written estimate, in... facility. (1) The estimate must equal the cost of conducting the activities described in paragraph (a)...

  12. Transaction Cost Economics (TCE) and Cost Estimation Methodology

    Science.gov (United States)

    2008-05-15

    1 Transaction Cost Economics (TCE) and Cost Estimation Methodology Diana Angelis, Francois Melese (DRMI) John Dillard, Chip Franck (GSBPP) NAVAL...TITLE AND SUBTITLE Transaction Cost Economics (TCE) and Cost Estimation Methodology 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER...NEXT? 3 OVERVIEW • ENTERING HYPOTHESIS • TRANSACTION COST ECONOMICS (TCE) – MAKE OR BUY, AND ASSOCIATED DIFFICULTIES • OUR VIEW OF TCE AND COST

  13. A RELATIVE STUDY ON COST ESTIMATION TECHNIQUES

    OpenAIRE

    K. Jayapratha; M. Muthamizharasan

    2017-01-01

    Software Cost Estimation is one of the most important part in software development. It involves in estimating the effort and cost in terms of money to complete the software development. Software Cost Estimation is very important when lines of code for the particular project exceeds certain limit, also when the software deployed with too many bugs and uncovered requirements the project will go incomplete. Software cost estimation of a project plays a vital role in acceptance or rejection of it...

  14. Modeling Uncertainty when Estimating IT Projects Costs

    OpenAIRE

    Winter, Michel; Mirbel, Isabelle; Crescenzo, Pierre

    2014-01-01

    In the current economic context, optimizing projects' cost is an obligation for a company to remain competitive in its market. Introducing statistical uncertainty in cost estimation is a good way to tackle the risk of going too far while minimizing the project budget: it allows the company to determine the best possible trade-off between estimated cost and acceptable risk. In this paper, we present new statistical estimators derived from the way IT companies estimate the projects' costs. In t...

  15. Hydrogen Station Cost Estimates: Comparing Hydrogen Station Cost Calculator Results with other Recent Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Melaina, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States); Penev, M. [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2013-09-01

    This report compares hydrogen station cost estimates conveyed by expert stakeholders through the Hydrogen Station Cost Calculation (HSCC) to a select number of other cost estimates. These other cost estimates include projections based upon cost models and costs associated with recently funded stations.

  16. Application of CERREX software for KRR-1 Decommissioning Cost Estimation

    Energy Technology Data Exchange (ETDEWEB)

    Hong, Yunjeong; Park, Seungkook [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Main objectives of cost estimation is to indicate the costs required to complete the decommissioning project and to optimize the dismantling sequence and timing and then minimize the decommissioning total costs. There are three types of cost estimate; (i) Order of magnitude estimate, (ii) Budgetary estimate, (iii) Definitive estimate. Second of the theses types is applied to cost calculation in this paper. This was also applied to cost estimate part of preliminary decommissioning plan for Kijang construction approval. In this paper, the methodology and procedure for decommissioning costing using CERREX software were presented and cost estimation was performed and compared with actual decommissioning cost for KRR- 1(Korea Reactor Research, Unit 1). Cost estimation for KRR-1 was carried out applying to CERREX software. Table 1 shows the result values of the calculation. The currency was calculated as USD. Calculated cost is within the limit of 'Budgetary estimate' and the values is approximately $7,800,000. Labor costs are calculated based on manpower components per involved professions and hour rates per typical professions.

  17. CONSTRUCTING ACCOUNTING UNCERTAINITY ESTIMATES VARIABLE

    Directory of Open Access Journals (Sweden)

    Nino Serdarevic

    2012-10-01

    Full Text Available This paper presents research results on the BIH firms’ financial reporting quality, utilizing empirical relation between accounting conservatism, generated in created critical accounting policy choices, and management abilities in estimates and prediction power of domicile private sector accounting. Primary research is conducted based on firms’ financial statements, constructing CAPCBIH (Critical Accounting Policy Choices relevant in B&H variable that presents particular internal control system and risk assessment; and that influences financial reporting positions in accordance with specific business environment. I argue that firms’ management possesses no relevant capacity to determine risks and true consumption of economic benefits, leading to creation of hidden reserves in inventories and accounts payable; and latent losses for bad debt and assets revaluations. I draw special attention to recent IFRS convergences to US GAAP, especially in harmonizing with FAS 130 Reporting comprehensive income (in revised IAS 1 and FAS 157 Fair value measurement. CAPCBIH variable, resulted in very poor performance, presents considerable lack of recognizing environment specifics. Furthermore, I underline the importance of revised ISAE and re-enforced role of auditors in assessing relevance of management estimates.

  18. Cost Overruns and Cost Estimation in the North Sea

    Energy Technology Data Exchange (ETDEWEB)

    Emhjellen, Magne; Emhjellen, Kjetil; Osmundsen, Petter

    2001-10-01

    Recently, a Norwegian government report on the cost overruns of projects in the North Sea was presented (NOU 1999:11). It concluded that there was a 25% increase in development costs from project sanction (POD, Plan for Operation and Development) to last CCE (Capital Cost Estimate) for the 11 oil field projects investigated. Many reasons like unclear project assumptions in early phase, optimistic interpolation of previous project assumptions, too optimistic estimates, and underestimation of uncertainty were given as reasons for overruns. In this article we highlight the possibility that the cost overruns are not necessarily all due to the reasons given, but also to an error in the estimation and reporting of the capital expenditure cost (CAPEX). Usually the CAPEX is given by a single cost figure, with some indication of its probability distribution. The oil companies report, and are required to do so by government authorities, the estimated 50/50 (median) cost estimate instead of the estimated expected value cost estimate. We demonstrate how the practice of using a 50/50 (median) CAPEX estimate for the 11 projects when the cost uncertainty distributions are asymmetric, may explain at least part of the ''overruns''. Hence, we advocate changing the practice of using 50/50 cost estimates instead of expected value cost estimates for project management and decision purposes. (author)

  19. Construction of a low-cost luximeter

    Science.gov (United States)

    Pedroso, L. S.; de Macedo, J. A.; de Araújo, M. S. T.; Voelzke, M. R.

    2016-04-01

    This paper proposes the construction of an electronic instrument called digital luximeter, combining simplicity and low cost, making it simpler and cheaper than those on the market. Its construction tends to facilitate dissemination and access to this type of measuring instrument between high school teachers and educational institutions, making it ideal to be a science lab.

  20. Fuzzy case based reasoning in sports facilities unit cost estimating

    Science.gov (United States)

    Zima, Krzysztof

    2016-06-01

    This article presents an example of estimating costs in the early phase of the project using fuzzy case-based reasoning. The fragment of database containing descriptions and unit cost of sports facilities was shown. The formulas used in Case Based Reasoning method were presented, too. The article presents similarity measurement using a few formulas, including fuzzy similarity. The outcome of cost calculations based on CBR method was presented as a fuzzy number of unit cost of construction work.

  1. A better approach to cost estimation.

    Science.gov (United States)

    Richmond, Russ

    2013-03-01

    Using ratios of costs to charges (RCCs) to estimate costs can cause hospitals to significantly over- or under-invest in service lines. A focus on improving cost estimation in cost centers where physicians have significant control over operating expenses, such as drugs or implants, can strengthen decision making and strategic planning. Connecting patient file information to purchasing data can lead to more accurate reflections of actual costs and help hospitals gain better visibility across service lines.

  2. LHC Civil Engineering Construction Contracts Cost Monitoring and Budget Forecasting

    CERN Document Server

    Skelton, K

    2000-01-01

    The Civil Engineering project for the LHC is estimated at 350 MCHF, of which about 316 MCHF is for the construction contracts. These contracts are based on a system of remeasurement whereby the consultant estimates the quantities required for the construction of each structure and the contractor commits himself to the unit price, which define the initial tender price. There are many factors that affect the final price for these contracts, from increases or decreases in quantities of the estimated amounts in the original bill of quantities to variations to the contract. This paper will look at how these factors change costs at the individual level of a structure to the overall costs of the contract. It will look at how the Civil Engineering Group monitors these changes to calculate cash flows and final costs and how this information is used as a basis for budget forecasts.

  3. Construction Cost Analysis : Residential Construction Demonstration Project Cycle II.

    Energy Technology Data Exchange (ETDEWEB)

    Barnett, Cole; Thor, Philip W.

    1990-06-01

    The Residential Construction Demonstration Project (RCDP) is designed to demonstrate new residential building techniques and product innovations which advance the stage-of-the-art in constructing energy-efficient electrically heated residences. A secondary purpose is to obtain documented cost and energy savings data from which to make accurate assessments of the cost-effectiveness of various conservation innovations. The project solicits participation of regional homebuilders by offering them financial incentives for constructing homes to the Model Conservation Standards (MCS) and including at least one innovation.'' The innovations are determined by BPA and the States prior to construction and represent construction techniques or energy saving products that might reduce the cost of building MCS homes, or expand the options available to builders in achieving MCS levels of energy efficiency in homes. Besides covering some of the additional risk for employing the innovation, the incentive payment guarantees that builders will provide certain amounts of information regarding the cost and acceptability of building the homes. In addition, an incentive is paid to homeowners for their participation in data collection efforts following construction. Several one-time'' tests were performed on the houses and homeowners were required to report energy consumption and temperature data on a weekly basis for approximately 18 months. BPA and the States compile the information obtained from the builders and homeowners. Access to this data is provided for the purpose of analyzing the cost and performance of the RCDP homes, as well as understanding the value of the various innovations that are tested. 25 tabs., 4 figs.

  4. Residential construction cost: An Italian survey.

    Science.gov (United States)

    Canesi, Rubina; Marella, Giuliano

    2017-04-01

    This paper reports data describing development projects for new buildings according to construction costs in North-East Italy. A survey was carried out on local companies undertaking new residential development projects in two Italian regions (Veneto and Lombardy). The aim of this survey was to record new real estate construction projects, collecting both technical and socio-economic cost features. It is extremely difficult to collect such data for the Italian real estate construction sector, due to its lack of transparency, so that the novelty for the Italian scenario is the dataset itself. Another interest perspective of this survey is that socio-economic characteristics were also recorded; they are often studied in urban economics, but are usually related to property purchase prices and values, not to construction costs. The data come from an analysis of Canesi and Marella regarding the relationship between the trend of construction costs and the socio-economic conditions of the reference setting, such as the mean years of schooling of the workforce, housing market trends, and average per capita income.

  5. Cost estimate for the Kilometric Optical Interferometer (KOI)

    Science.gov (United States)

    Bakker, Eric J.; Parameswariah, Chethan; Rajagopal, Jayadev

    2008-07-01

    We present a parametric cost estimate for the Kilometric Optical Interferometer (KOI) in a classical array configuration: 24 telescopes, 4-meter primary mirror, up to 1 km baseline. The parametric cost estimate is based on available cost information from the Magdalena Ridge Observatory (MRO) Interferometer at New Mexico Tech. A Kilometric Optical Interferometer based on a classical array concept has an estimated construction cost between 1B and 3B if it would be built today (2008 dollars and technology). The implication of the estimated construction cost is that cost reductions are critical in the planning phase to bring the cost within a reasonable envelope. Hence we propose to set a budget ceiling that seems feasible given the support to be expected from the scientific community and funding agencies. Given a budget ceiling, a design-to-cost process should be followed. We propose to set a construction phase budget cap of $800M (2008 dollars) for KOI as an initial goal. Narrowing down of the science goals in combination with technology development to reduce cost and technological complexity are the main areas of activities for the next decade. We propose to establish a virtual project office to coordinate these activities.

  6. Consideration of ISDC for Decommissioning Cost Estimation

    Energy Technology Data Exchange (ETDEWEB)

    Cho, W. H.; Park, S. K.; Choi, Y. D.; Kim, I. S.; Moon, J. K. [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    In 2009, they decided to update the Yellow Book, and began to update it by analyzing user experiences. They found that several countries have adopted the proposed standardized cost structure for the production of cost estimates directly or for mapping national estimates onto a common structure. They also made conclusions that more detailed advice should be given on the use of the standardized structure and on the definition of cost items to avoid ambiguity. The revised cost structure, to be known as the International Structure for Decommissioning Costing (ISDC), was published in 2012. The standardized cost structure developed in the report may be used for estimating the costs of decommissioning of any type of nuclear facility. We analyzed this standardized cost structure (ISDC) and applied it to DECOMMIS which was developed by KAERI. The appropriate estimation system for domestic application was examined by comparing the estimation results. KAERI made WBS code in DECOMMIS and data obtained during decommissioning work of KRR2 and UCP. Recently the IAEA updated the decommissioning cost items and its structure by ISDC. The cost estimation items of the DECOMMIS were applied to ISDC structure. For applying, the ISDC code compared with WBS code of DECOMMIS as on text of the activity name from daily report basis. The mapping result of the ISDC items to WBS code of the DECOMMIS is much different. AS results of this study that it need the corresponding cost category which classified in accordance with the national standard price estimates.

  7. Costs Climb on Materials for Schools: Construction Projects Delayed, Scrapped

    Science.gov (United States)

    Sack, Joetta L.

    2004-01-01

    The rapidly rising cost of steel and other construction materials is forcing some districts that are building new schools to scramble for more money, delay work, or redesign projects. Nationwide, contractors and architects are finding it harder to give accurate estimates on projects, and some have even had to renegotiate contracts with districts.…

  8. The Role of Estimation on Construction Life Cycle

    Directory of Open Access Journals (Sweden)

    Eduard Antohie

    2010-03-01

    Full Text Available Estimates serve a number of different functions in the construction industry. The reason for estimating is to provide the most realistic prediction possible of time and cost at any given stage in a project. Over the life of a project the estimator should be able to produce a series of estimates, from an early estimate at beginning, to the final account, in which the increasing accuracy of the estimate is reflected in the decreasing extent of risk and uncertainty. All estimates take the form of base estimates, plus allowances for uncertainties and specific contingencies as required. The role of the estimator or practitioner in cost engineering is vital to the success of a construction project. The estimators are responsible for predicting the most economic costs for construction in a way that is both clear and consistent. Although an estimator will have a feel for the prices in the marketplace, it is the responsibility of management to add an amount for general overheads, assess the risks and turn the estimate into tender.

  9. Cost Estimating Handbook for Environmental Restoration

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-09-01

    Environmental restoration (ER) projects have presented the DOE and cost estimators with a number of properties that are not comparable to the normal estimating climate within DOE. These properties include: An entirely new set of specialized expressions and terminology. A higher than normal exposure to cost and schedule risk, as compared to most other DOE projects, due to changing regulations, public involvement, resource shortages, and scope of work. A higher than normal percentage of indirect costs to the total estimated cost due primarily to record keeping, special training, liability, and indemnification. More than one estimate for a project, particularly in the assessment phase, in order to provide input into the evaluation of alternatives for the cleanup action. While some aspects of existing guidance for cost estimators will be applicable to environmental restoration projects, some components of the present guidelines will have to be modified to reflect the unique elements of these projects. The purpose of this Handbook is to assist cost estimators in the preparation of environmental restoration estimates for Environmental Restoration and Waste Management (EM) projects undertaken by DOE. The DOE has, in recent years, seen a significant increase in the number, size, and frequency of environmental restoration projects that must be costed by the various DOE offices. The coming years will show the EM program to be the largest non-weapons program undertaken by DOE. These projects create new and unique estimating requirements since historical cost and estimating precedents are meager at best. It is anticipated that this Handbook will enhance the quality of cost data within DOE in several ways by providing: The basis for accurate, consistent, and traceable baselines. Sound methodologies, guidelines, and estimating formats. Sources of cost data/databases and estimating tools and techniques available at DOE cost professionals.

  10. Estimating nursing costs--a methodological review.

    Science.gov (United States)

    Chiang, Bea

    2009-05-01

    A critical cost accounting issue relating to nursing costs is that nursing costs are currently averaged into the daily room rate in the hospitals. This accounting practice treats nursing units as cost centers as nursing costs are bundled into a per diem rate instead of billed separately. As a result, all patients in a given care unit of the hospital are presumed to consume the same amount of nursing care resources. This costing and billing system creates a mismatch between resources consumption and billed charges. The objective of this paper is to (1) demonstrate current practice to estimate nursing costs, (2) classify nursing costs into direct and indirect costs in order to refine the existing approaches and (3) argue that a system of billing nursing costs separately better reflects the costs of patient care.

  11. A Cost Estimation Tool for Charter Schools

    Science.gov (United States)

    Hayes, Cheryl D.; Keller, Eric

    2009-01-01

    To align their financing strategies and fundraising efforts with their fiscal needs, charter school leaders need to know how much funding they need and what that funding will support. This cost estimation tool offers a simple set of worksheets to help start-up charter school operators identify and estimate the range of costs and timing of…

  12. Maximum Likelihood Estimation of Search Costs

    NARCIS (Netherlands)

    J.L. Moraga-Gonzalez (José Luis); M.R. Wildenbeest (Matthijs)

    2006-01-01

    textabstractIn a recent paper Hong and Shum (forthcoming) present a structural methodology to estimate search cost distributions. We extend their approach to the case of oligopoly and present a maximum likelihood estimate of the search cost distribution. We apply our method to a data set of online p

  13. Failing to Estimate the Costs of Offshoring

    DEFF Research Database (Denmark)

    Møller Larsen, Marcus

    2016-01-01

    This article investigates cost estimation errors in the context of offshoring. It is argued that an imprecise estimation of the costs related to implementing a firm activity in a foreign location has a negative impact on the process performance of that activity. Performance is deterred...

  14. Factors causing cost variation for constructing wastewater projects in Egypt

    Directory of Open Access Journals (Sweden)

    Remon Fayek Aziz

    2013-03-01

    Full Text Available Cost is one of the major considerations throughout the project management life cycle and can be regarded as one of the most important parameters of a project and the driving force of project success. Despite its proven importance, it is common to see a construction project failing to achieve its objectives within the specific cost. Cost variation is a very frequent phenomenon and is almost associated with nearly constructing all wastewater projects. Maintaining steady cost projection on wastewater projects had been recently an issue of serious concern, both to the client and project contractors. Cost deviation from initial cost plan had been prevalent on construction sites. However, little or no effort has been made to curtail the phenomenon, this research work attempts to identify, investigate and rank factors perceived to affect cost variation in the Egyptian wastewater projects with respect to their relative importance so as to proffer possible ways of coping with this phenomenon. To achieve this objective, author invited practitioners and experts, comprising a statistically representative sample, to participate in a structured questionnaire survey. Brain storming was taken into consideration, through which a number of cost variation factors were identified for constructing wastewater projects. Totally 52 factors were short-listed to be made part of the questionnaire survey and the survey was conducted with experts and representatives from private, public and local general construction firms. The data were analyzed using Relative Importance Index, ranking and simple percentages. It was analytically discovered that factors such as: (1 Lowest bidding procurement method; (2 Additional work; (3 Bureaucracy in bidding/tendering method; (4 Wrong method of cost estimation; and (5 Funding problems were critical for causing cost variation, while (1 Inaccurate cost estimation; (2 Mode of financing and payment for completed work; (3 Unexpected ground

  15. Demystifying the Cost Estimation Process

    Science.gov (United States)

    Obi, Samuel C.

    2010-01-01

    In manufacturing today, nothing is more important than giving a customer a clear and straight-forward accounting of what their money has purchased. Many potentially promising return business orders are lost because of unclear, ambiguous, or improper billing. One of the best ways of resolving cost bargaining conflicts is by providing a…

  16. Demystifying the Cost Estimation Process

    Science.gov (United States)

    Obi, Samuel C.

    2010-01-01

    In manufacturing today, nothing is more important than giving a customer a clear and straight-forward accounting of what their money has purchased. Many potentially promising return business orders are lost because of unclear, ambiguous, or improper billing. One of the best ways of resolving cost bargaining conflicts is by providing a…

  17. BIM: Integrating Cost Estimates at Initial/Design Stage

    Directory of Open Access Journals (Sweden)

    Raja Bukhary Raja Taihairan

    2015-10-01

    Full Text Available The accuracy of the cost estimates is very important in the initial stage because it will determine the viability of the project and provide the project budget. Therefore, Inaccuracy of the cost estimates beyond the acceptable range will cause the cost overrun in the later stage. This research aims to recommend BIM to be applied as a part of the cost management process and to improve the cost estimating at the initial/design stage. In addition, this research will investigate the factors influencing the accuracy, why BIM not been applied to reduce the inaccuracy and how BIM can be integrated into cost estimates at the initial / design stage. This research was carried out via literature review, questionnaire survey and semi-structured interview. It was indicated that insufficient information related to the project, poor communication between project team and complexity of design and construction are the three most factors influenced the accuracy of cost estimates. While collaborating and sharing information between the project team, and investment in software and training are the barriers in implementing BIM. The research also found out that BIM is an integrated multi-disciplinary tool that serves architecture, structural and M&E. In addition, the capability of BIM in assisting cost estimates allow QS to focus more value adding activities in estimating such as: identifying construction assemblies, pricing and factoring risks, which are essential for high quality estimates. In conclusion, with the capability of BIM and its integration will help to minimize the error and enhance the project cost estimates in the future.

  18. COST ESTIMATING RELATIONSHIPS IN ONSHORE DRILLING PROJECTS

    Directory of Open Access Journals (Sweden)

    Ricardo de Melo e Silva Accioly

    2017-03-01

    Full Text Available Cost estimating relationships (CERs are very important tools in the planning phases of an upstream project. CERs are, in general, multiple regression models developed to estimate the cost of a particular item or scope of a project. They are based in historical data that should pass through a normalization process before fitting a model. In the early phases they are the primary tool for cost estimating. In later phases they are usually used as an estimation validation tool and sometimes for benchmarking purposes. As in any other modeling methodology there are number of important steps to build a model. In this paper the process of building a CER to estimate drilling cost of onshore wells will be addressed.

  19. Architects and Design-Phase Cost Estimates: Design Professionals Should Reconsider the Value of Third-Party Estimates

    Science.gov (United States)

    Coakley, John

    2010-01-01

    Professional cost estimators are widely used by architects during the design phases of a project to provide preliminary cost estimates. These estimates may begin at the conceptual design phase and are prepared at regular intervals through the construction document phase. Estimating professionals are frequently tasked with "selling" the importance…

  20. Cost estimate guidelines for advanced nuclear power technologies

    Energy Technology Data Exchange (ETDEWEB)

    Delene, J.G.; Hudson, C.R. II

    1993-05-01

    Several advanced power plant concepts are currently under development. These include the Modular High Temperature Gas Cooled Reactors, the Advanced Liquid Metal Reactor and the Advanced Light Water Reactors. One measure of the attractiveness of a new concept is its cost. Invariably, the cost of a new type of power plant will be compared with other alternative forms of electrical generation. This report provides a common starting point, whereby the cost estimates for the various power plants to be considered are developed with common assumptions and ground rules. Comparisons can then be made on a consistent basis. This is the second update of these cost estimate guidelines. Changes have been made to make the guidelines more current (January 1, 1992) and in response to suggestions made as a result of the use of the previous report. The principal changes are that the reference site has been changed from a generic Northeast (Middletown) site to a more central site (EPRI`s East/West Central site) and that reference bulk commodity prices and labor productivity rates have been added. This report is designed to provide a framework for the preparation and reporting of costs. The cost estimates will consist of the overnight construction cost, the total plant capital cost, the operation and maintenance costs, the fuel costs, decommissioning costs and the power production or busbar generation cost.

  1. Process Equipment Cost Estimation, Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Loh, H. P. [National Energy Technology Lab. (NETL), Morgantown, WV (United States); Lyons, Jennifer [EG& G Technical Services, Inc., Morgantown, WV (United States); White, Charles W. [EG& G Technical Services, Inc., Morgantown, WV (United States)

    2002-01-01

    This report presents generic cost curves for several equipment types generated using ICARUS Process Evaluator. The curves give Purchased Equipment Cost as a function of a capacity variable. This work was performed to assist NETL engineers and scientists in performing rapid, order of magnitude level cost estimates or as an aid in evaluating the reasonableness of cost estimates submitted with proposed systems studies or proposals for new processes. The specific equipment types contained in this report were selected to represent a relatively comprehensive set of conventional chemical process equipment types.

  2. Costing for the Future: Exploring Cost Estimation With Unmanned Autonomous Systems

    Science.gov (United States)

    2016-04-30

    account for how cost estimating for autonomy is different than current methodologies and to suggest ways it can be addressed through the integration and...required effort for a UMAS, we use the Constructive Systems Engineering Cost Model (COSYSMO). This parametric model’s output accounts for integrating...Fabrycky, 2003). The current practice in many organizations is to focus most of the cost of product development and when the project reaches the T

  3. CONSTRUCTION COST INTEGRATED CONTROL BASED ON COMPUTER SIMULATION

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    Construction cost control is a complex system engineering. Thetraditional controlling method cannot dynamically control in advance the construction cost because of its hysteresis. This paper proposes a computer simulation based construction cost integrated control method, which combines the cost with PERT systematically, so that the construction cost can be predicted and optimized systematically and effectively. The new method overcomes the hysteresis of the traditional systems, and is a distinct improvement over them in effect and practicality.

  4. An Application of Data Mining Algorithms for Shipbuilding Cost Estimation

    NARCIS (Netherlands)

    Kaluzny, B.L.; Barbici, S.; Berg, G.; Chiomento, R.; Derpanis,D.; Jonsson, U.; Shaw, R.H.A.D.; Smit, M.C.; Ramaroson, F.

    2011-01-01

    This article presents a novel application of known data mining algorithms to the problem of estimating the cost of ship development and construction. The work is a product of North Atlantic Treaty Organization Research and Technology Organization Systems Analysis and Studies 076 Task Group “NATO Ind

  5. Cost analysis and estimating tools and techniques

    CERN Document Server

    Nussbaum, Daniel

    1990-01-01

    Changes in production processes reflect the technological advances permeat­ ing our products and services. U. S. industry is modernizing and automating. In parallel, direct labor is fading as the primary cost driver while engineering and technology related cost elements loom ever larger. Traditional, labor-based ap­ proaches to estimating costs are losing their relevance. Old methods require aug­ mentation with new estimating tools and techniques that capture the emerging environment. This volume represents one of many responses to this challenge by the cost analysis profession. The Institute of Cost Analysis (lCA) is dedicated to improving the effective­ ness of cost and price analysis and enhancing the professional competence of its members. We encourage and promote exchange of research findings and appli­ cations between the academic community and cost professionals in industry and government. The 1990 National Meeting in Los Angeles, jointly spo~sored by ICA and the National Estimating Society (NES),...

  6. 48 CFR 1852.216-73 - Estimated cost and cost sharing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost and cost... and Clauses 1852.216-73 Estimated cost and cost sharing. As prescribed in 1816.307-70(a), insert the following clause: Estimated Cost and Cost Sharing (DEC 1991) (a) It is estimated that the total cost...

  7. 48 CFR 1552.216-76 - Estimated cost and cost-sharing.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost and cost... 1552.216-76 Estimated cost and cost-sharing. As prescribed in 1516.307(c), insert the following clause: Estimated Cost and Cost-Sharing (APR 1996) (a) The total estimated cost of performing the work under...

  8. Structural Estimation of Stock Market Participation Costs

    DEFF Research Database (Denmark)

    Khorunzhina, Natalia

    2013-01-01

    This paper develops and estimates a dynamic model of stock market participation, where consumers' decisions regarding stock market participation are influenced by participation costs. The practical significance of the participation costs is considered as being a channel through which financial...... education programs can affect consumers' investment decisions. Using household data from the Panel Study of Income Dynamics, I estimate the magnitude of the participation cost, allowing for individual heterogeneity in it. The results show the average stock market participation cost is about 4–6% of labor...... income; however, it varies substantially over consumers' life. The model successfully predicts the level of the observed participation rate and the increasing pattern of stock market participation over the consumers' life cycle....

  9. Cost estimate of electricity produced by TPV

    Science.gov (United States)

    Palfinger, Günther; Bitnar, Bernd; Durisch, Wilhelm; Mayor, Jean-Claude; Grützmacher, Detlev; Gobrecht, Jens

    2003-05-01

    A crucial parameter for the market penetration of TPV is its electricity production cost. In this work a detailed cost estimate is performed for a Si photocell based TPV system, which was developed for electrically self-powered operation of a domestic heating system. The results are compared to a rough estimate of cost of electricity for a projected GaSb based system. For the calculation of the price of electricity, a lifetime of 20 years, an interest rate of 4.25% per year and maintenance costs of 1% of the investment are presumed. To determine the production cost of TPV systems with a power of 12-20 kW, the costs of the TPV components and 100 EUR kW-1el,peak for assembly and miscellaneous were estimated. Alternatively, the system cost for the GaSb system was derived from the cost of the photocells and from the assumption that they account for 35% of the total system cost. The calculation was done for four different TPV scenarios which include a Si based prototype system with existing technology (etasys = 1.0%), leading to 3000 EUR kW-1el,peak, an optimized Si based system using conventional, available technology (etasys = 1.5%), leading to 900 EUR kW-1el,peak, a further improved system with future technology (etasys = 5%), leading to 340 EUR kW-1el,peak and a GaSb based system (etasys = 12.3% with recuperator), leading to 1900 EUR kW-1el,peak. Thus, prices of electricity from 6 to 25 EURcents kWh-1el (including gas of about 3.5 EURcents kWh-1) were calculated and compared with those of fuel cells (31 EURcents kWh-1) and gas engines (23 EURcents kWh-1).

  10. Costs of sea dikes - regressions and uncertainty estimates

    Science.gov (United States)

    Lenk, Stephan; Rybski, Diego; Heidrich, Oliver; Dawson, Richard J.; Kropp, Jürgen P.

    2017-05-01

    Failure to consider the costs of adaptation strategies can be seen by decision makers as a barrier to implementing coastal protection measures. In order to validate adaptation strategies to sea-level rise in the form of coastal protection, a consistent and repeatable assessment of the costs is necessary. This paper significantly extends current knowledge on cost estimates by developing - and implementing using real coastal dike data - probabilistic functions of dike costs. Data from Canada and the Netherlands are analysed and related to published studies from the US, UK, and Vietnam in order to provide a reproducible estimate of typical sea dike costs and their uncertainty. We plot the costs divided by dike length as a function of height and test four different regression models. Our analysis shows that a linear function without intercept is sufficient to model the costs, i.e. fixed costs and higher-order contributions such as that due to the volume of core fill material are less significant. We also characterise the spread around the regression models which represents an uncertainty stemming from factors beyond dike length and height. Drawing an analogy with project cost overruns, we employ log-normal distributions and calculate that the range between 3x and x/3 contains 95 % of the data, where x represents the corresponding regression value. We compare our estimates with previously published unit costs for other countries. We note that the unit costs depend not only on the country and land use (urban/non-urban) of the sites where the dikes are being constructed but also on characteristics included in the costs, e.g. property acquisition, utility relocation, and project management. This paper gives decision makers an order of magnitude on the protection costs, which can help to remove potential barriers to developing adaptation strategies. Although the focus of this research is sea dikes, our approach is applicable and transferable to other adaptation measures.

  11. Support to LANL: Cost estimation. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1993-10-04

    This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOE planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors.

  12. Applying AHP—Based CBR to Estimate Pavement Maintenance Cost

    Institute of Scientific and Technical Information of China (English)

    Jui-Sheng Chou

    2008-01-01

    The cost-efficacy control of maintenance operations in developing countries has become critical to the infrastructure asset management after highway construction.To effectively manage numerous projects annually with limited resources,it is necessary to reasonably estimate costs during the process of making maintenance project selection decisions.This study outlines the modeling of case-based reasoning (CBR) estimation that compares and retrieves the most similar instance across the case library.Four CBR ap- proaches were presented and assessed in terms of their mean absolute prediction error rates.The resulting model demonstrates the ability of estimating the pavement maintenance project costs with the satisfactory accuracy at the early stages.

  13. PROCEDURE FOR ESTIMATING PERMANENT TOTAL ENCLOSURE COSTS

    Science.gov (United States)

    The paper discusses a procedure for estimating permanent total enclosure (PTE) costs. (NOTE: Industries that use add-on control devices must adequately capture emissions before delivering them to the control device. One way to capture emissions is to use PTEs, enclosures that mee...

  14. Unmanned Aerial Vehicles unique cost estimating requirements

    Science.gov (United States)

    Malone, P.; Apgar, H.; Stukes, S.; Sterk, S.

    Unmanned Aerial Vehicles (UAVs), also referred to as drones, are aerial platforms that fly without a human pilot onboard. UAVs are controlled autonomously by a computer in the vehicle or under the remote control of a pilot stationed at a fixed ground location. There are a wide variety of drone shapes, sizes, configurations, complexities, and characteristics. Use of these devices by the Department of Defense (DoD), NASA, civil and commercial organizations continues to grow. UAVs are commonly used for intelligence, surveillance, reconnaissance (ISR). They are also use for combat operations, and civil applications, such as firefighting, non-military security work, surveillance of infrastructure (e.g. pipelines, power lines and country borders). UAVs are often preferred for missions that require sustained persistence (over 4 hours in duration), or are “ too dangerous, dull or dirty” for manned aircraft. Moreover, they can offer significant acquisition and operations cost savings over traditional manned aircraft. Because of these unique characteristics and missions, UAV estimates require some unique estimating methods. This paper describes a framework for estimating UAV systems total ownership cost including hardware components, software design, and operations. The challenge of collecting data, testing the sensitivities of cost drivers, and creating cost estimating relationships (CERs) for each key work breakdown structure (WBS) element is discussed. The autonomous operation of UAVs is especially challenging from a software perspective.

  15. Estimating management costs of protected areas

    DEFF Research Database (Denmark)

    Green, Jonathan M.H.; Burgess, Neil David; Green, Rhys E.

    2012-01-01

    in actual spend and over 40% of variation in necessary spend. Population pressure is a variable that has not been used to model protected area management costs before, yet proved to be considerably better at predicting both actual and necessary spend than other measures of anthropogenic pressure. We use our...... results to estimate necessary spend at a 9 km2 resolution across the EAM and highlight those areas where the management costs of effective management are predicted to be high. This information can be used by conservation planners in the region and can be estimated for future scenarios of population growth......Despite chronic underfunding for conservation and the recognition that funds must be invested wisely, few studies have analysed the direct costs of managing protected areas at the spatial scales needed to inform local site management. Using a questionnaire survey we collected data from protected...

  16. 48 CFR 1352.216-70 - Estimated and allowable costs.

    Science.gov (United States)

    2010-10-01

    ... Estimated and allowable costs. As prescribed in 48 CFR 1316.307(a), insert the following clause: Estimated and Allowable Costs (APR 2010) (a) Estimated Costs. The estimated cost of this contract is... 48 Federal Acquisition Regulations System 5 2010-10-01 2010-10-01 false Estimated and...

  17. How software can sharpen up cost estimation

    Energy Technology Data Exchange (ETDEWEB)

    Stebbins, S.

    1993-05-01

    Sherpa is a menu driven software package, designed by Western Mine Engineering Inc., to determine capital and operating costs for surface mining operations. The programme is engineering-based (as opposed to based on statistics) meaning that all equipment, labour and supply requirements are determined from deposit design, production, and geologic information using standard engineering techniques. These requirements are used in conjunction with equipment, supply, and labour cost data bases internal to the programme to determine all associated costs. By programming the engineering processes commonly used to estimate costs, Sherpa is designed to allow users working in the pre-feasibility stage to function at a level of detail normally reserved for final feasibility studies. 1 fig., 2 tabs.

  18. Breckinridge Project, initial effort. Report VIII. Capital cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    The major objective of the Initial Effort for the Breckinridge Project is to develop engineering to the point where realistic economics for the construction and operation of the plant can be made. The plant is designed to process 23,000 tons per day of run-of-mine coal to produce a nominal 50,000 barrels per day of liquid products using the H-COAL and standard industry technology. The plant will be located in Breckinridge County, Kentucky. Considerable preliminary engineering has been performed for this estimate. This work uses a single-point design based on the Process Demonstration Unit (PDU) data from run 5, period 29 of the pilot plant. The design basis is discussed in Volume II of this report. Many aspects of plant construction and cost have been considered that were not taken into account in the past studies. Ashland and Bechtel believe the accuracy of the capital estimate to be +19%, -17%. This accuracy is postulated on January 1981 dollars, the as-spent dollar amount naturally depending upon the inflation rate through the construction period. Considerable attention has been devoted to reliability of operation, and redundant equipment has been used where it was deemed necessary to assure reasonable onstream time. This equipment is included in the capital estimate. The capital is summarized by total plant cost on Table 1. The subtotal plant cost, excluding contingency, fee, and adjustment is $2,710,940,000. Adding the contingency, fee and adjustment, the total depreciable cost of the plant is $3,167,430,000. Adding the working capital to the total plant cost results in total capital requirements of $3,258,430,000 as shown on the individual plant cost summary Table 2.

  19. Estimating medical costs of gastroenterological diseases

    Institute of Scientific and Technical Information of China (English)

    Li-Fang Chou

    2004-01-01

    AIM: To estimate the direct medical costs of gastroenterological diseases within the universal health insurance program among the population of local residents in Taiwan.METHODS: The data sources were the first 4 cohort datasets of 200 000 people from the National Health Insurance Research Database in Taipei. The ambulatory,inpatient and pharmacy claims of the cohort in 2001 were analyzed. Besides prevalence and medical costs of diseases,both amount and costs of utilization in procedures and drugs were calculated.RESULTS: Of the cohort with 183 976 eligible people, 44.2% had ever a gastroenterological diagnosis during the year.The age group 20-39 years had the lowest prevalence rate(39.2%) while the elderly had the highest (58.4%). The prevalence rate was higher in women than in men (48.5%vs. 40.0%). Totally, 30.4% of 14 888 inpatients had ever a gastroenterological diagnosis at discharge and 18.8% of 51 359 patients at clinics of traditional Chinese medicine had such a diagnosis there. If only the principal diagnosis on each daim was considered, 16.2% of admissions, 8.0% of outpatient visits, and 10.1% of the total medical costs (8 469 909 US dollars/83 830 239 US dollars) were attributed to gastroenterological diseases. On average, 46.0 US dollars per insured person in a year were spent in treating gastroenterological diseases.Diagnostic procedures related to gastroenterological diseases accounted for 24.2% of the costs for all diagnostic procedures and 2.3% of the total medical costs. Therapeutic procedures related to gastroenterological diseases accounted for 4.5% of the costs for all therapeutic procedures and 1.3% of thetotal medical costs. Drugs related to gastroenterological diseases accounted for 7.3% of the costs for all drugs and 1.9% of the total medical costs.CONCLUSION: Gastroenterological diseases are prevalent among the population of local residents in Taiwan, account ingfor a tenth of the total medical costs. Further investigations are needed to

  20. 48 CFR 1852.216-81 - Estimated cost.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost. 1852.216-81... Estimated cost. As prescribed in 1816.307-70(d), insert the following clause: Estimated cost (DEC 1988) The total estimated cost for complete performance of this contract is $ . See FAR clause 52.216-11,...

  1. Estimating Maintenance Cost for Web Applications

    Directory of Open Access Journals (Sweden)

    Ion IVAN

    2016-01-01

    Full Text Available The current paper tackles the issue of determining a method for estimating maintenance costs for web applications. The current state of research in the field of web application maintenance is summarized and leading theories and results are highlighted. The cost of web maintenance is determined by the number of man-hours invested in maintenance tasks. Web maintenance tasks are categorized into content maintenance and technical maintenance. Research is centered on analyzing technical maintenance tasks. The research hypothesis is formulated on the assumption that the number of man-hours invested in maintenance tasks can be assessed based on the web application’s user interaction level, complexity and content update effort. Data regarding the costs of maintenance tasks is collected from 24 maintenance projects implemented by a web development company that tackles a wide area of web applications. Homogeneity and diversity of collected data is submitted for debate by presenting a sample of the data and depicting the overall size and comprehensive nature of the entire dataset. A set of metrics dedicated to estimating maintenance costs in web applications is defined based on conclusions formulated by analyzing the collected data and the theories and practices dominating the current state of research. Metrics are validated with regards to the initial research hypothesis. Research hypothesis are validated and conclusions are formulated on the topic of estimating the maintenance cost of web applications. The limits of the research process which represented the basis for the current paper are enunciated. Future research topics are submitted for debate.

  2. Cost estimation and analysis using the Sherpa Automated Mine Cost Engineering System

    Energy Technology Data Exchange (ETDEWEB)

    Stebbins, P.E. [Western Mine Engineering, Spokane, WA (United States)

    1993-09-01

    The Sherpa Automated Mine Cost Engineering System is a menu-driven software package designed to estimate capital and operating costs for proposed surface mining operations. The program is engineering (as opposed to statistically) based, meaning that all equipment, manpower, and supply requirements are determined from deposit geology, project design and mine production information using standard engineering techniques. These requirements are used in conjunction with equipment, supply, and labor cost databases internal to the program to estimate all associated costs. Because virtually all on-site cost parameters are interrelated within the program, Sherpa provides an efficient means of examining the impact of changes in the equipment mix on total capital and operating costs. If any aspect of the operation is changed, Sherpa immediately adjusts all related aspects as necessary. For instance, if the user wishes to examine the cost ramifications of selecting larger trucks, the program not only considers truck purchase and operation costs, it also automatically and immediately adjusts excavator requirements, operator and mechanic needs, repair facility size, haul road construction and maintenance costs, and ancillary equipment specifications.

  3. Handbook for quick cost estimates. A method for developing quick approximate estimates of costs for generic actions for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Ball, J.R.

    1986-04-01

    This document is a supplement to a ''Handbook for Cost Estimating'' (NUREG/CR-3971) and provides specific guidance for developing ''quick'' approximate estimates of the cost of implementing generic regulatory requirements for nuclear power plants. A method is presented for relating the known construction costs for new nuclear power plants (as contained in the Energy Economic Data Base) to the cost of performing similar work, on a back-fit basis, at existing plants. Cost factors are presented to account for variations in such important cost areas as construction labor productivity, engineering and quality assurance, replacement energy, reworking of existing features, and regional variations in the cost of materials and labor. Other cost categories addressed in this handbook include those for changes in plant operating personnel and plant documents, licensee costs, NRC costs, and costs for other government agencies. Data sheets, worksheets, and appropriate cost algorithms are included to guide the user through preparation of rough estimates. A sample estimate is prepared using the method and the estimating tools provided.

  4. Supplemental report on cost estimates'

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1992-04-29

    The Office of Management and Budget (OMB) and the U.S. Army Corps of Engineers have completed an analysis of the Department of Energy's (DOE) Fiscal Year (FY) 1993 budget request for its Environmental Restoration and Waste Management (ERWM) program. The results were presented to an interagency review group (IAG) of senior-Administration officials for their consideration in the budget process. This analysis included evaluations of the underlying legal requirements and cost estimates on which the ERWM budget request was based. The major conclusions are contained in a separate report entitled, ''Interagency Review of the Department of Energy Environmental Restoration and Waste Management Program.'' This Corps supplemental report provides greater detail on the cost analysis.

  5. The Construction of the New Military Pension System and the Estimation of Transition Cost%新型军人养老保险制度的构建及其转轨成本测算∗

    Institute of Scientific and Technical Information of China (English)

    陈元刚; 冯丹; 蔡振武

    2015-01-01

    我国现行军人养老保险是军队统筹,且保障范围狭窄、制度衔接不畅、实际养老待遇较低、财政负担过重、基金管理效率低下;为实现养老保险制度全民统筹和切实保障军人的养老权益,应构建社会统筹与个人账户相结合、辅以年金账户的新型军人养老保险制度。军人养老保险制度的转轨成本来源于当前军人养老保险制度下隐性债务的显性化,采用系统动力学模型对军人养老保险制度的转轨成本进行模拟测算,结果表明:截至2090年底转轨成本将全部显性化,“老人”和“中人”的转轨成本都呈先增后减的趋势,2035—2065年的转轨成本最高;借助社会统筹账户资金积累的缓冲和人口年龄与人口结构的变化,能够分散制度转轨带来的财务支付风险,改革不会对政府财政带来巨大压力。因此,应坚持养老保险社会统筹的改革方向,积极推进军人养老保险制度改革。%Planned as a whole by the military, the current military pension system has some shortcoming such as narrow insurance coverage, weak link⁃up between systems, low pension level in practice, overloaded finance, low⁃efficient fund management. In order to plan the pension system by the nation and insure military pension right, a new military pension system should be constructed including pooling accounts, individual accounts and annuity accounts. The transition cost of military pension system comes from explicitation of recessive debt under the system of present military pension system. By system dynamics approach, the transition cost of military pension system is estimated. The results show that by the end of 2090, the transition costs is fully explicit; both transition cost of "old" and "middle aged" appear a high⁃to⁃low trend; from 2035 to 2065, the cost reaches a peak value. The pooling accounts capital accumulation buffer and the changes of population age

  6. Statistical Cost Estimation in Higher Education: Some Alternatives.

    Science.gov (United States)

    Brinkman, Paul T.; Niwa, Shelley

    Recent developments in econometrics that are relevant to the task of estimating costs in higher education are reviewed. The relative effectiveness of alternative statistical procedures for estimating costs are also tested. Statistical cost estimation involves three basic parts: a model, a data set, and an estimation procedure. Actual data are used…

  7. 28 CFR 19.4 - Cost and percentage estimates.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 1 2010-07-01 2010-07-01 false Cost and percentage estimates. 19.4... RECOVERY OF MISSING CHILDREN § 19.4 Cost and percentage estimates. It is estimated that this program will cost DOJ $78,000 during the initial year. This figure is based on estimates of printing, inserting,...

  8. Estimating costs and manpower requirements for conventional wastewater treatment facilities

    National Research Council Canada - National Science Library

    Patterson, W.L; Banker, R.F

    1971-01-01

    Data for estimating average construciton costs, operation and maintenance costs, and manpower staffing requirements, are presented for conventional wastewater treatment plants ranging from 1 to 100...

  9. Estimated generic prices of cancer medicines deemed cost-ineffective in England: a cost estimation analysis

    Science.gov (United States)

    Hill, Andrew; Redd, Christopher; Gotham, Dzintars; Erbacher, Isabelle; Meldrum, Jonathan; Harada, Ryo

    2017-01-01

    Objectives The aim of this study was to estimate lowest possible treatment costs for four novel cancer drugs, hypothesising that generic manufacturing could significantly reduce treatment costs. Setting This research was carried out in a non-clinical research setting using secondary data. Participants There were no human participants in the study. Four drugs were selected for the study: bortezomib, dasatinib, everolimus and gefitinib. These medications were selected according to their clinical importance, novel pharmaceutical actions and the availability of generic price data. Primary and secondary outcome measures Target costs for treatment were to be generated for each indication for each treatment. The primary outcome measure was the target cost according to a production cost calculation algorithm. The secondary outcome measure was the target cost as the lowest available generic price; this was necessary where export data were not available to generate an estimate from our cost calculation algorithm. Other outcomes included patent expiry dates and total eligible treatment populations. Results Target prices were £411 per cycle for bortezomib, £9 per month for dasatinib, £852 per month for everolimus and £10 per month for gefitinib. Compared with current list prices in England, these target prices would represent reductions of 74–99.6%. Patent expiry dates were bortezomib 2014–22, dasatinib 2020–26, everolimus 2019–25 and gefitinib 2017. The total global eligible treatment population in 1 year is 769 736. Conclusions Our findings demonstrate that affordable drug treatment costs are possible for novel cancer drugs, suggesting that new therapeutic options can be made available to patients and doctors worldwide. Assessing treatment cost estimations alongside cost-effectiveness evaluations is an important area of future research. PMID:28110283

  10. Cost estimation and economical evaluation of three configurations of activated sludge process for a wastewater treatment plant (WWTP) using simulation

    National Research Council Canada - National Science Library

    Jafarinejad, Shahryar

    ...s. Economical modeling and cost estimation of activated sludge processes are crucial for designing, construction, and forecasting future economical requirements of wastewater treatment plants (WWTPs...

  11. Preliminary Study on Causative Factors Leading to Construction Cost Overrun

    Directory of Open Access Journals (Sweden)

    Aftab Hameed Memon

    2011-07-01

    Full Text Available Cost is the fundamental component for any construction project. However, cost overrun is observed as one of the most frequently occurring issues in construction projects worldwide and need to be studied more to alleviate this issue in the future. This trend is more severe in developing countries where these overruns sometimes exceeds 100% of the anticipated cost of the project.   Like other countries, construction industry in Malaysia is also facing a lot of challenges such as the delay to complete the project in time, the expenditure exceeding the budget, the building defects and over dependent of foreign workers. The ultimate effects of project delay also results in exceeding cost. This leads to serious need of addressing the critical issue of construction cost overrun. To avoid construction cost overrun, very first and most important step is to identify and understand the causes and factors responsible for that. Hence, this paper is aimed to identify various factors responsible for construction cost overrun. Through a comprehensive study of literature review, common factors causing cost overrun resulting in identification of 78 factors were mapped in frequency table. A questionnaire survey and interviews were carried out amongst selected experienced personnel for expert opinion to identify the significant factors causing cost overrun in Malaysia. Five respondents were selected from each of the respondents groups including client, consultant and contractor. The questionnaire responses were analyzed by average index method, which resulted in identification of 59 common factors causing construction cost overrun in Malaysia. Results show that poor design & delays in Design, unrealistic contract duration & requirements imposed, lack of experience, late delivery of materials & equipment, relationship between management & labour, delay preparation & approval of drawings, inadequate planning & scheduling, poor site management & supervision and

  12. Salt marsh construction costs and shrimp production

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Continuing wetland loss in Galveston Bay, Texas (USA) has led to the development of various salt marsh restoration projects. These constructed wetlands often attempt...

  13. Project control integrating cost and schedule in construction

    CERN Document Server

    Del Pico, Wayne J

    2013-01-01

    The key to successful project control is the fusing of cost to schedule whereby the management of one helps to manage the other. Project Control: Integrating Cost and Schedule in Construction explores the reasons behind and the methodologies for proper planning, monitoring, and controlling both project costs and schedule. Filling a current void the topic of project control applied to the construction industry, it is essential reading for students and professionals alike.

  14. Physical distribution costs in construction supply chains: a systems approach

    NARCIS (Netherlands)

    Voordijk, Johannes T.

    2010-01-01

    The objective of this study is to provide insights into the trade-offs of physical distribution cost patterns in construction supply chains by modelling and measuring these costs. The model of the physical distribution system consists of the following (cost) elements: inventory, transport, handling,

  15. Physical distribution costs in construction supply chains: a systems approach

    NARCIS (Netherlands)

    Voordijk, Hans

    2010-01-01

    The objective of this study is to provide insights into the trade-offs of physical distribution cost patterns in construction supply chains by modelling and measuring these costs. The model of the physical distribution system consists of the following (cost) elements: inventory, transport, handling,

  16. Estimating Military Aircraft Cost Using Least Squares Support Vector Machines

    Institute of Scientific and Technical Information of China (English)

    ZHU Jia-yuan; ZHANG Xi-bin; ZHANG Heng-xi; REN Bo

    2004-01-01

    A multi-layer adaptive optimizing parameters algorithm is developed for improving least squares support vector machines(LS-SVM),and a military aircraft life-cycle-cost(LCC)intelligent estimation model is proposed based on the improved LS-SVM.The intelligent cost estimation process is divided into three steps in the model.In the first step,a cost-drive-factor needs to be selected,which is significant for cost estimation.In the second step,military aircraft training samples within costs and cost-drive-factor set are obtained by the LS-SVM.Then the model can be used for new type aircraft cost estimation.Chinese military aircraft costs are estimated in the paper.The results show that the estimated costs by the new model are closer to the true costs than that of the traditionally used methods.

  17. Estimated Annual Maintenance Costs for Educational Facilities in Eritrea

    DEFF Research Database (Denmark)

    Vagnby, Bo Hellisen

    Global estimated annual costs for undertaking basic maintenance of all educational facilities in Eritrea.......Global estimated annual costs for undertaking basic maintenance of all educational facilities in Eritrea....

  18. ICPP tank farm closure study. Volume 3: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the six options described in Volume 1, Section 2: Option 1 -- Total removal clean closure; No subsequent use; Option 2 -- Risk-based clean closure; LLW fill; Option 3 -- Risk-based clean closure; CERCLA fill; Option 4 -- Close to RCRA landfill standards; LLW fill; Option 5 -- Close to RCRA landfill standards; CERCLA fill; and Option 6 -- Close to RCRA landfill standards; Clean fill. This volume is divided into two portions. The first portion contains the cost and planning schedule estimates while the second portion contains life-cycle costs and yearly cash flow information for each option.

  19. Estimation of immunization providers' activities cost, medication cost, and immunization dose errors cost in Iraq.

    Science.gov (United States)

    Al-lela, Omer Qutaiba B; Bahari, Mohd Baidi; Al-abbassi, Mustafa G; Salih, Muhannad R M; Basher, Amena Y

    2012-06-01

    The immunization status of children is improved by interventions that increase community demand for compulsory and non-compulsory vaccines, one of the most important interventions related to immunization providers. The aim of this study is to evaluate the activities of immunization providers in terms of activities time and cost, to calculate the immunization doses cost, and to determine the immunization dose errors cost. Time-motion and cost analysis study design was used. Five public health clinics in Mosul-Iraq participated in the study. Fifty (50) vaccine doses were required to estimate activities time and cost. Micro-costing method was used; time and cost data were collected for each immunization-related activity performed by the clinic staff. A stopwatch was used to measure the duration of activity interactions between the parents and clinic staff. The immunization service cost was calculated by multiplying the average salary/min by activity time per minute. 528 immunization cards of Iraqi children were scanned to determine the number and the cost of immunization doses errors (extraimmunization doses and invalid doses). The average time for child registration was 6.7 min per each immunization dose, and the physician spent more than 10 min per dose. Nurses needed more than 5 min to complete child vaccination. The total cost of immunization activities was 1.67 US$ per each immunization dose. Measles vaccine (fifth dose) has a lower price (0.42 US$) than all other immunization doses. The cost of a total of 288 invalid doses was 744.55 US$ and the cost of a total of 195 extra immunization doses was 503.85 US$. The time spent on physicians' activities was longer than that spent on registrars' and nurses' activities. Physician total cost was higher than registrar cost and nurse cost. The total immunization cost will increase by about 13.3% owing to dose errors.

  20. The application of cost behaviour and estimation in organisational ...

    African Journals Online (AJOL)

    The application of cost behaviour and estimation in organisational decision ... the calculation of standard cost and the provision of relevant costs for pricing and ... Based on these findings, the paper recommends among others the need for the ...

  1. A generic framework for cost estimation and cost control in product design

    NARCIS (Netherlands)

    Weustink, I.F.; Brinke, ten E.; Streppel, A.H.; Kals, H.J.J.

    2000-01-01

    Traditionally, cost estimation was performed after the design process, though most opportunities of cost reduction have already passed. Therefore, it is advantageous to be able to estimate the product costs early in the product development cycle. By changing the way cost estimation is dealt with, it

  2. A generic framework for cost estimation and cost control in product design

    NARCIS (Netherlands)

    Lutters-Weustink, Ilanit F.; ten Brinke, E.; Streppel, A.H.; Kals, H.J.J.

    2000-01-01

    Traditionally, cost estimation was performed after the design process, though most opportunities of cost reduction have already passed. Therefore, it is advantageous to be able to estimate the product costs early in the product development cycle. By changing the way cost estimation is dealt with, it

  3. Cost estimate for a proposed GDF Suez LNG testing program

    Energy Technology Data Exchange (ETDEWEB)

    Blanchat, Thomas K.; Brady, Patrick Dennis; Jernigan, Dann A.; Luketa, Anay Josephine; Nissen, Mark R.; Lopez, Carlos; Vermillion, Nancy; Hightower, Marion Michael

    2014-02-01

    At the request of GDF Suez, a Rough Order of Magnitude (ROM) cost estimate was prepared for the design, construction, testing, and data analysis for an experimental series of large-scale (Liquefied Natural Gas) LNG spills on land and water that would result in the largest pool fires and vapor dispersion events ever conducted. Due to the expected cost of this large, multi-year program, the authors utilized Sandia's structured cost estimating methodology. This methodology insures that the efforts identified can be performed for the cost proposed at a plus or minus 30 percent confidence. The scale of the LNG spill, fire, and vapor dispersion tests proposed by GDF could produce hazard distances and testing safety issues that need to be fully explored. Based on our evaluations, Sandia can utilize much of our existing fire testing infrastructure for the large fire tests and some small dispersion tests (with some modifications) in Albuquerque, but we propose to develop a new dispersion testing site at our remote test area in Nevada because of the large hazard distances. While this might impact some testing logistics, the safety aspects warrant this approach. In addition, we have included a proposal to study cryogenic liquid spills on water and subsequent vaporization in the presence of waves. Sandia is working with DOE on applications that provide infrastructure pertinent to wave production. We present an approach to conduct repeatable wave/spill interaction testing that could utilize such infrastructure.

  4. Identifying Contractors’ Planned Quality Costs in Indonesian Construction Projects

    Directory of Open Access Journals (Sweden)

    Puti F. Marzuki

    2014-12-01

    Full Text Available In a very competitive construction industry, quality costs have to be measured to be able to identify potential quality problem areas and to focus attention on work output improvement opportunities. The awareness of contractors on the importance of quality costs could be reflected in the extent of their quality costs planning. This paper presents an identification of planned quality costs in three construction projects executed by two large Indonesian contractors, a state-owned company and a private company in Jakarta. The objective is to enable the contractors to elaborate their quality costs planning and thereby improve their work output based on the findi ngs. Quality costs are first grouped into three categories: prevention, appraisal, and failure costs. Based on the works of previous researchers, a list of quality management activities that should be covered in each quality costs category is then created. The contractors’ planned quality costs data for each category are identified and collected through interviews and questionnaire surveys that refer to the list. Quality costs are expressed as a percentage of contract value. It is revealed that although large contractors already have certain knowledge on quality costs in construction projects, these costs are not planned in a structured way through an analysis of systematic quality costs records. Through cost categorization it is also shown that higher prevention and appraisal costs lead to lower failure costs. It is then concluded that a lot of work is still to be done by the contractors to set up a quality costs recording system which can serve as a basis for their quality improvement planning.

  5. IVF cycle cost estimation using Activity Based Costing and Monte Carlo simulation.

    Science.gov (United States)

    Cassettari, Lucia; Mosca, Marco; Mosca, Roberto; Rolando, Fabio; Costa, Mauro; Pisaturo, Valerio

    2016-03-01

    The Authors present a new methodological approach in stochastic regime to determine the actual costs of an healthcare process. The paper specifically shows the application of the methodology for the determination of the cost of an Assisted reproductive technology (ART) treatment in Italy. The reason of this research comes from the fact that deterministic regime is inadequate to implement an accurate estimate of the cost of this particular treatment. In fact the durations of the different activities involved are unfixed and described by means of frequency distributions. Hence the need to determine in addition to the mean value of the cost, the interval within which it is intended to vary with a known confidence level. Consequently the cost obtained for each type of cycle investigated (in vitro fertilization and embryo transfer with or without intracytoplasmic sperm injection), shows tolerance intervals around the mean value sufficiently restricted as to make the data obtained statistically robust and therefore usable also as reference for any benchmark with other Countries. It should be noted that under a methodological point of view the approach was rigorous. In fact it was used both the technique of Activity Based Costing for determining the cost of individual activities of the process both the Monte Carlo simulation, with control of experimental error, for the construction of the tolerance intervals on the final result.

  6. Problems and Improvement Suggestions for the Cost Estimation of Overseas Oil and Gas Construction Projects%海外油气建设项目概算编制存在的问题及改进建议

    Institute of Scientific and Technical Information of China (English)

    陈绍会; 曹治栓; 郑鑫杰

    2016-01-01

    近两年受国际大环境的影响,中国石油海外业务的发展速度有所放缓,因而在有限市场资源框架内提升海外项目的投资效益显得尤为迫切。目前中国石油海外油气建设项目Feed阶段的概算是在国内基本设计概算的基础上进行测算的,与项目本身及项目所在地区的实际情况结合不紧密,可能会出现定额直接费调整不到位、税费计取不全面及汇率波动对投资产生较大影响等问题,这些问题的存在使得概算金额无法客观、合理、全面地反映项目的实际投资情况。针对存在的问题,提出了以下几点建议:紧密结合项目合同进行认真调研;充分掌握项目所在地区的税收政策;投资细分、对准一揽子货币;不断提高造价人员的专业水平。%In recent years,influenced by the international environment,the pace of devel-opment of CNPC’s overseas business has slowed down. Therefore, in the framework of the limited market resources, it’s very important to improve the investment benefits of overseas projects. At present, the CNPC oil and gas construction projects’estimation of feed stage is estimated at the basis of the domestic projects’basic design.This isn’t combined with the ac-tual situation of projects and project areas. It will produce many problems:a fixed direct fee adjustment is not in place, take less comprehensive about taxes, rate fluctuations on the im-pact of investment, and so on. These problems make the project estimation not objectively/reasonably and comprehensively respond to the projects’actual investment. Therefore, sev-eral suggestions are put forward to, for example: Closely integrated with project contracts and careful investigation;Fully grasp the tax policy of project area;Investment segmentation and alignment of the basket of currencies;We should continuously improve the professional level of cost engineers.

  7. Cost Estimation of Web Projects inContext with Agile Paradigm: Improvements and Validation

    OpenAIRE

    2013-01-01

    Agile practitioners have expressed concern over their inability to correctly estimate costs associated with Agile web software development. This concern has become even more critical as costs associated with development continue to increase. As a result, significant research attention is now intended for gaining a better understanding of the web based projects in context with Agile software-development process as well as constructing and evaluating calibrated software cost estimating tools. T...

  8. 15 CFR 23.4 - Cost and percentage estimates.

    Science.gov (United States)

    2010-01-01

    ... 15 Commerce and Foreign Trade 1 2010-01-01 2010-01-01 false Cost and percentage estimates. 23.4... LOCATION AND RECOVERY OF MISSING CHILDREN § 23.4 Cost and percentage estimates. It is estimated that this... estimate that 9% of its penalty mail will transmit missing children photographs and information when...

  9. Formulation of a Construction Cost Estimating Procedure to Aid Designers in Preparing Detailed Construction Cost Estimates.

    Science.gov (United States)

    1986-09-01

    0KK -- ItJ 3 4 ’k K’ 49 co’ it KK’’’ ’K’ 41’ ’K’K ’KKKKK KK ’ - K IN it oY 4 r4 - K 0’ U ’ ’ 0 -k ’ 0 -j’ * e Z. 49 t’ D~~~~~’ I~ gor a 1 9 I O(D >K 0.-K...NO 41 P* * ON *U4 "U -4 CJ (~49 S-. 41 T.--49 0. -4 i 4 q-4 * -t O49 tD 24 41 -490C341 r_ .11 0- 49 03 z .oe I S 41 0-41 i 49 00. 41 1. " 1 0’ +0M f

  10. A Survey of Cost Estimating Methodologies for Distributed Spacecraft Missions

    Science.gov (United States)

    Foreman, Veronica L.; Le Moigne, Jacqueline; de Weck, Oliver L.

    2016-01-01

    Satellite constellations and Distributed Spacecraft Mission (DSM) architectures offer unique benefits to Earth observation scientists and unique challenges to cost estimators. The Cost and Risk (CR) module of the Tradespace Analysis Tool for Constellations (TAT-C) being developed by NASA Goddard seeks to address some of these challenges by providing a new approach to cost modeling, which aggregates existing Cost Estimating Relationships (CER) from respected sources, cost estimating best practices, and data from existing and proposed satellite designs. Cost estimation through this tool is approached from two perspectives: parametric cost estimating relationships and analogous cost estimation techniques. The dual approach utilized within the TAT-C CR module is intended to address prevailing concerns regarding early design stage cost estimates, and offer increased transparency and fidelity by offering two preliminary perspectives on mission cost. This work outlines the existing cost model, details assumptions built into the model, and explains what measures have been taken to address the particular challenges of constellation cost estimating. The risk estimation portion of the TAT-C CR module is still in development and will be presented in future work. The cost estimate produced by the CR module is not intended to be an exact mission valuation, but rather a comparative tool to assist in the exploration of the constellation design tradespace. Previous work has noted that estimating the cost of satellite constellations is difficult given that no comprehensive model for constellation cost estimation has yet been developed, and as such, quantitative assessment of multiple spacecraft missions has many remaining areas of uncertainty. By incorporating well-established CERs with preliminary approaches to approaching these uncertainties, the CR module offers more complete approach to constellation costing than has previously been available to mission architects or Earth

  11. Parametric estimation of medical care costs under conditions of censoring

    OpenAIRE

    Raikou, Maria; McGuire, Alistair

    2009-01-01

    This paper is concerned with a set of parametric estimators that attempt to provide consistent estimates of average medical care costs under conditions of censoring. The main finding is that incorporation of the inverse of the probability of an individual not being censored in the estimating equations is instrumental in deriving unbiased cost estimates. The success of the approach is dependent on the amount of available information on the cost history process. The value of this information in...

  12. Oil development-operating cost estimates, 1955-85

    Energy Technology Data Exchange (ETDEWEB)

    Adelman, M.A.; Shahi, M.

    1989-01-01

    Few if any published oil production cost estimates can be verified as to method and basic data. Using US drilling costs and some assumptions explained in the text, this paper estimates development-operating costs in 41 oil-producing nations, from 1955 to 1985, from publicly available data on drilling. Estimation methods are described in detail so that anyone with access to better information on any item can substitute it to arrive at a better estimate.

  13. Quality Cost in the Construction Industry ' Preliminary Findings in Malaysia

    Directory of Open Access Journals (Sweden)

    Mukhtar Che Ali

    2010-06-01

    Full Text Available One of the key areas being emphasis in ISO 9001 Quality Management System (QMS is performance measurement towards continual improvement. Among the primary measuring tools is quality cost approach. Quality cost has been well practice in manufacturing sector but slowly gain its importance in construction industry. In fact Project Management Body of Knowledge (PMBOK has reckoned quality cost as one of the tool and technique in few of its management processes. In view of such circumstances that has prompted an effort to undertake a study to ascertain the level of knowledge and practice on quality cost in Malaysian construction landscape. The targeted group of respondents was the personnel in the project management team. Capitalizing Construction Industry Development Board (CIDB National Electronic Tendering Initiatives (NETI road shows which were held in year 2007 throughout the country, the author was able to garner 263 respondents representing the project management team. Subsequently the data gathered from the completed forms were analyzed using Statistical Package for Social Science (SPSS software. General findings indicated that the level of knowledge and practice on quality cost among the project management team were relatively low. One of the main contributing factors was poor knowledge in the area related to quality cost. Despite of such scenario most of the respondents showed their interest in acquiring knowledge in the field of quality cost. Hence quality cost approach is at the infancy stage in Malaysian construction industry.

  14. Lifetime costs of lung transplantation : Estimation of incremental costs

    NARCIS (Netherlands)

    VanEnckevort, PJ; Koopmanschap, MA; Tenvergert, EM; VanderBij, W; Rutten, FFH

    1997-01-01

    Despite an expanding number of centres which provide lung transplantation, information about the incremental costs of lung transplantation is scarce. From 1991 until 1995, in The Netherlands a technology assessment was performed which provided information about the incremental costs of lung transpla

  15. Lifetime costs of lung transplantation : Estimation of incremental costs

    NARCIS (Netherlands)

    VanEnckevort, PJ; Koopmanschap, MA; Tenvergert, EM; VanderBij, W; Rutten, FFH

    1997-01-01

    Despite an expanding number of centres which provide lung transplantation, information about the incremental costs of lung transplantation is scarce. From 1991 until 1995, in The Netherlands a technology assessment was performed which provided information about the incremental costs of lung transpla

  16. Cross Service Fixed-Wing Cost Estimation

    Science.gov (United States)

    2016-05-17

    clarify the costing methods for O&S costs for fixed-wing delivery platforms with the intent of extending the research to other cross- service mission costs...proof-of-concept, this project will concentrate on equating equitable cross- service costs for fixed-wing munitions delivery platforms. The method of... delivery is an essential part of the AoA, especially when the project proposed is the replacement of current missile systems. The services have

  17. Constructing minimum-cost flow-dependent networks

    Science.gov (United States)

    Thomas, Doreen A.; Weng, Jia F.

    2002-09-01

    In the construction of a communication network, the length of the network is an important but not unique factor determining the cost of the network. Among many possible network models, Gilbert proposed a flow-dependent model in which flow demands are assigned between each pair of points in a given point set A, and the cost per unit length of a link in the network is a function of the flow through the link. In this paper we first investigate the properties of this Gilbert model: the concavity of the cost function, decomposition, local minimality, the number of Steiner points and the maximum degree of Steiner points. Then we propose three heuristics for constructing minimum cost Gilbert networks. Two of them come from the fact that generally a minimum cost Gilbert network stands between two extremes: the complete network G(A) on A and the edge-weighted Steiner minimal tree W(A) on A. The first heuristic starts with G(A) and reduces the cost by splitting angles; the second one starts with both G(A) and W(A), and reduces the cost by selecting low cost paths. As a generalisation of the second heuristic, the third heuristic constructs a new Gilbert network of less cost by hybridising known Gilbert networks. Finally we discuss some considerations in practical applications.

  18. 40 CFR 265.142 - Cost estimate for closure.

    Science.gov (United States)

    2010-07-01

    ... estimate in current dollars, or by using an inflation factor derived from the most recent Implicit Price... must have a detailed written estimate, in current dollars, of the cost of closing the facility in... cost estimate for inflation within 60 days prior to the anniversary date of the establishment of...

  19. Aircraft bi-level life cycle cost estimation

    NARCIS (Netherlands)

    Zhao, X.; Verhagen, W.J.C.; Curan, R.

    2015-01-01

    n an integrated aircraft design and analysis practice, Life Cycle Cost (LCC) is essential for decision making. The LCC of an aircraft is ordinarily partially estimated by emphasizing a specific cost type. However, an overview of the LCC including design and development cost, production cost, operati

  20. Aircraft bi-level life cycle cost estimation

    NARCIS (Netherlands)

    Zhao, X.; Verhagen, W.J.C.; Curan, R.

    2015-01-01

    n an integrated aircraft design and analysis practice, Life Cycle Cost (LCC) is essential for decision making. The LCC of an aircraft is ordinarily partially estimated by emphasizing a specific cost type. However, an overview of the LCC including design and development cost, production cost,

  1. A generic tool for cost estimating in aircraft design

    NARCIS (Netherlands)

    Castagne, S.; Curran, R.; Rothwell, A.; Price, M.; Benard, E.; Raghunathan, S.

    2008-01-01

    A methodology to estimate the cost implications of design decisions by integrating cost as a design parameter at an early design stage is presented. The model is developed on a hierarchical basis, the manufacturing cost of aircraft fuselage panels being analysed in this paper. The manufacturing cost

  2. Probabilistic prediction of expected ground condition and construction time and costs in road tunnels

    Directory of Open Access Journals (Sweden)

    A. Mahmoodzadeh

    2016-10-01

    Full Text Available Ground condition and construction (excavation and support time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected construction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding.

  3. Probabilistic prediction of expected ground condition and construction time and costs in road tunnels

    Institute of Scientific and Technical Information of China (English)

    A. Mahmoodzadeh; S. Zare

    2016-01-01

    Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an integration of the ground prediction approach based on Markov process, and the time and cost variance analysis based on Monte-Carlo (MC) simulation. The former provides the probabilistic description of ground classification along tunnel alignment according to the geological information revealed from geological profile and boreholes. The latter provides the probabilistic description of the expected con-struction time and costs for each operation according to the survey feedbacks from experts. Then an engineering application to Hamro tunnel is presented to demonstrate how the ground condition and the construction time and costs are estimated in a probabilistic way. In most items, in order to estimate the data needed for this methodology, a number of questionnaires are distributed among the tunneling experts and finally the mean values of the respondents are applied. These facilitate both the owners and the contractors to be aware of the risk that they should carry before construction, and are useful for both tendering and bidding.

  4. Viability Assessment of a Repository at Yucca Mountain. Volume 5: Costs to Construct and Operate the Repository

    Energy Technology Data Exchange (ETDEWEB)

    None

    1998-12-01

    This volume presents a management summary of the cost estimate to complete the design, and to license, construct, operate, monitor, close, and decommission a Monitored Geologic Repository at Yucca Mountain in Nevada. This volume summarizes the scope, estimating methodologies, and assumptions used in development of the Monitored Geologic Repository-VA cost estimate. It identifies the key features necessary to understand the summary costs presented herein. This cost summary derives from a larger body of documented cost analysis. Volume 5 is organized to reflect this structured approach to cost estimation and contains the following sections: Section 1, Cost Elements. This section briefly defines the components of each major repository cost element. Section 2, Project Phases. This section presents the definition, as used in the estimate, of five project phases (Licensing, Pre-emplacement Construction, Emplacement Operations, Monitoring, and Closure and Decommissioning) and the schedule dates for each phase. It also contains major milestone dates and a bar chart schedule. Section 3, Major Assumptions. This section identifies key high-level assumptions for the cost estimate basis. Additional detailed assumptions are included in the appendices. Section 4, Integrated Cost Summary. This section presents a high-level roll-up of the VA costs resulting from the estimating work. The tables and figures contained in this section were compiled from the more detailed cost estimates in the appendices. Section 5, References. This section identifies the references that support this cost volume. Appendices. For each major repository cost element, Appendices B-F [B, C, D, E, F] presents additional information on the scope of cost elements, identifies methodologies used to develop the cost estimates, lists underlying cost assumptions, and tabulates summary results. Appendix A contains a glossary to assist the reader in understanding the terminology in Volume 5. Appendix G presents costs

  5. 建筑工程单方造价快速估算方法综述%Review of the New Methods of Fast Estimation of Construction Engineering Unit Square Cost

    Institute of Scientific and Technical Information of China (English)

    梁迅

    2012-01-01

    The accurate estimate of investment at the early stage of the construction has great influence on the propulsion of the construction work. There is no unified general model applicable to all kinds of construction projects. Regarding the domestic economic and technological conditions, Chinese experts have established models on the basis of different ways at home and abroad. The pros and cons of various methods and the scope of the application are summarized.%投资估算处于建筑工程的前期阶段,准确的估算对项目的推进有重大的意义.目前还没有统一通用的模型适用于各类建筑工程.详细阐述了国内专家针对目前国内的具体经济技术状况,结合国内外的各种方法,建立相应的模型.并进一步总结各种方法的优劣性以及适用范围.

  6. SYNERGIC IMPACT ON SLIPPAGE, COST AND TIME IN CONSTRUCTION PROJECT

    Directory of Open Access Journals (Sweden)

    C. K .Georgekutty

    2012-07-01

    Full Text Available Construction Industry in Kerala has a physical environment which influence cost, time. This is a peculiar issue of a developing country, which leads to many setbacks in completion of projects. This approach has made many challenges in the growth of construction. Material management is an important aspect in project planning andcontrol. It contributes a major portion of expense in construction projects. Controlling procurement and carrying cost can reduce total project cost. To identify the reason for setbacks and suggest an appropriate workable solution under the special circumstances is the aim of this study. A questionnaire survey has been conducted among hundred selected ongoing housing projects in Kochi and nearby districts. Based on the study, only 15% of the projects are expected to complete in time. Though all materials are equally important in construction, some of the key materials specifically control the project cost. A dynamic control over the materials can control project cost. Continues process will optimize the total project cost.

  7. Cost estimation of feature oriented software development: Statistical approach

    Directory of Open Access Journals (Sweden)

    Jawad Khan

    2016-12-01

    Full Text Available Software cost estimation is the important part of software development and used to predict the effort which is mandatory part for development of software system. Feature Model is a set of products that represents set of feature in feature model. Software cost estimation is about predicting amount of cost in software development cycle. SCE give analysis both to user as well customer regarding to budging planning. In this paper we have represent a statistical approach for finding cost estimation of feature oriented software development. We have used CPM approach from which we will find commonality as well cost of each feature which will be deploy in feature oriented software development.

  8. Product Assembly Cost Estimation Based on Artificial Neural Networks

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    This paper proposes a method for assembly cost estimation in actual manufacture during the design phase using artificial neural networks (ANN). It can support the de signers in cost effectiveness, then help to control the total cost. The method was used in the assembly cost estimation of the crucial parts of some railway stock products. As a compari son, we use the linear regression (LR) model in the same field. The result shows that ANN model performs better than the LR model in assembly cost estimation.

  9. Process-based Cost Estimation for Ramjet/Scramjet Engines

    Science.gov (United States)

    Singh, Brijendra; Torres, Felix; Nesman, Miles; Reynolds, John

    2003-01-01

    Process-based cost estimation plays a key role in effecting cultural change that integrates distributed science, technology and engineering teams to rapidly create innovative and affordable products. Working together, NASA Glenn Research Center and Boeing Canoga Park have developed a methodology of process-based cost estimation bridging the methodologies of high-level parametric models and detailed bottoms-up estimation. The NASA GRC/Boeing CP process-based cost model provides a probabilistic structure of layered cost drivers. High-level inputs characterize mission requirements, system performance, and relevant economic factors. Design alternatives are extracted from a standard, product-specific work breakdown structure to pre-load lower-level cost driver inputs and generate the cost-risk analysis. As product design progresses and matures the lower level more detailed cost drivers can be re-accessed and the projected variation of input values narrowed, thereby generating a progressively more accurate estimate of cost-risk. Incorporated into the process-based cost model are techniques for decision analysis, specifically, the analytic hierarchy process (AHP) and functional utility analysis. Design alternatives may then be evaluated not just on cost-risk, but also user defined performance and schedule criteria. This implementation of full-trade study support contributes significantly to the realization of the integrated development environment. The process-based cost estimation model generates development and manufacturing cost estimates. The development team plans to expand the manufacturing process base from approximately 80 manufacturing processes to over 250 processes. Operation and support cost modeling is also envisioned. Process-based estimation considers the materials, resources, and processes in establishing cost-risk and rather depending on weight as an input, actually estimates weight along with cost and schedule.

  10. Estimating the cost of major ongoing cost plus hardware development programs

    Science.gov (United States)

    Bush, J. C.

    1990-01-01

    Approaches are developed for forecasting the cost of major hardware development programs while these programs are in the design and development C/D phase. Three approaches are developed: a schedule assessment technique for bottom-line summary cost estimation, a detailed cost estimation approach, and an intermediate cost element analysis procedure. The schedule assessment technique was developed using historical cost/schedule performance data.

  11. Handbook for cost estimating. A method for developing estimates of costs for generic actions for nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Ball, J.R.; Cohen, S.; Ziegler, E.Z.

    1984-10-01

    This document provides overall guidance to assist the NRC in preparing the types of cost estimates required by the Regulatory Analysis Guidelines and to assist in the assignment of priorities in resolving generic safety issues. The Handbook presents an overall cost model that allows the cost analyst to develop a chronological series of activities needed to implement a specific regulatory requirement throughout all applicable commercial LWR power plants and to identify the significant cost elements for each activity. References to available cost data are provided along with rules of thumb and cost factors to assist in evaluating each cost element. A suitable code-of-accounts data base is presented to assist in organizing and aggregating costs. Rudimentary cost analysis methods are described to allow the analyst to produce a constant-dollar, lifetime cost for the requirement. A step-by-step example cost estimate is included to demonstrate the overall use of the Handbook.

  12. Research of cost aspects of cement pavements construction

    Science.gov (United States)

    Bezuglyi, Artem; Illiash, Sergii; Tymoshchuk, Oleksandr

    2017-09-01

    The tendency to increasing traffic volume on public roads and to increased axle loads of vehicles makes the road scientists to develop scientifically justified methods for preserving the existing and developing the new transport network of Ukraine. One of the options for solving such issues is the construction of roads with rigid (cement concrete) pavement. However, any solution must be justified considering technical and economic components. This paper presents the results of the research of cost aspects of cement pavements construction.

  13. Estimating railway infrastructure project cost from transferring nominal price to real price by considering the working time possessions

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Salling, Kim Bang

    The purpose of the paper is to estimate railway project construction cost based on the nominal market price. Currently, estimation of project costs within railway infrastructure procurement is particularly challenging due to; 1) construction costs highly depend on possession timeframes and duration...... and 2) railway construction work costs are not transparent in the market. This paper suggests separating the costs into 3 sub-categories: materials, labour and machinery. Evidently, the materials are further broke-down into subcomponents which then remains fixed whereas the cost of labour and machinery...... construction project, the new line to the fixed link across Fehmarn Belt, is introduced where it is shown that the non-material cost is about 19% of the total expenditure. By assuming three sets of track blocking scenarios with the same amount of construction works it is proven that given an optimal track...

  14. Estimating railway infrastructure project cost from transferring nominal price to real price by considering the working time possessions

    DEFF Research Database (Denmark)

    Li, Rui; Landex, Alex; Salling, Kim Bang

    The purpose of the paper is to estimate railway project construction cost based on the nominal market price. Currently, estimation of project costs within railway infrastructure procurement is particularly challenging due to; 1) construction costs highly depend on possession timeframes and duration...... and 2) railway construction work costs are not transparent in the market. This paper suggests separating the costs into 3 sub-categories: materials, labour and machinery. Evidently, the materials are further broke-down into subcomponents which then remains fixed whereas the cost of labour and machinery...... construction project, the new line to the fixed link across Fehmarn Belt, is introduced where it is shown that the non-material cost is about 19% of the total expenditure. By assuming three sets of track blocking scenarios with the same amount of construction works it is proven that given an optimal track...

  15. Cost Estimating Cases: Educational Tools for Cost Analysts

    Science.gov (United States)

    1993-09-01

    DATE: 22 Jul 9X WBS ELEMENT/NUM JR: Systems Engineering/Program Mangement /1070 PRODUCTION BRIEF DESCRIPTION: The estimating/technical teams evaluated...Overcoming a Weakness of the Case Method," Cornell Hotel and Restaurant Administration Ouarterly, 3:69-72 (August 1992). 14. Takekuwa, Laura. Budget Course

  16. Hospital Case Cost Estimates Modelling - Algorithm Comparison

    CERN Document Server

    Andru, Peter

    2008-01-01

    Ontario (Canada) Health System stakeholders support the idea and necessity of the integrated source of data that would include both clinical (e.g. diagnosis, intervention, length of stay, case mix group) and financial (e.g. cost per weighted case, cost per diem) characteristics of the Ontario healthcare system activities at the patient-specific level. At present, the actual patient-level case costs in the explicit form are not available in the financial databases for all hospitals. The goal of this research effort is to develop financial models that will assign each clinical case in the patient-specific data warehouse a dollar value, representing the cost incurred by the Ontario health care facility which treated the patient. Five mathematical models have been developed and verified using real dataset. All models can be classified into two groups based on their underlying method: 1. Models based on using relative intensity weights of the cases, and 2. Models based on using cost per diem.

  17. Standardized cost estimation for new technology (SCENT) - methodology and tool

    NARCIS (Netherlands)

    Ereev, S.Y.; Patel, M.K.

    2012-01-01

    This paper presents the development of a methodology and tool (called SCENT) to prepare preliminary economic estimates of the total production costs related to manufacturing in the process industries. The methodology uses the factorial approach – cost objects are estimated using factors and

  18. 40 CFR 267.142 - Cost estimate for closure.

    Science.gov (United States)

    2010-07-01

    ... dollars, or by using an inflation factor derived from the most recent Implicit Price Deflator for Gross... active life of the facility, the owner or operator must adjust the closure cost estimate for inflation... closure cost estimate must be updated for inflation within 30 days after the close of the firm's fiscal...

  19. Cost estimate guidelines for advanced nuclear power technologies

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, C.R. II

    1987-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies.

  20. Cost estimate guidelines for advanced nuclear power technologies

    Energy Technology Data Exchange (ETDEWEB)

    Delene, J.G.; Hudson, C.R. II.

    1990-03-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies. 10 refs., 8 figs., 32 tabs.

  1. Cost estimate guidelines for advanced nuclear power technologies

    Energy Technology Data Exchange (ETDEWEB)

    Hudson, C.R. II

    1986-07-01

    To make comparative assessments of competing technologies, consistent ground rules must be applied when developing cost estimates. This document provides a uniform set of assumptions, ground rules, and requirements that can be used in developing cost estimates for advanced nuclear power technologies.

  2. Fuel Cost Estimation for Sumatra Grid System

    Science.gov (United States)

    Liun, Edwaren

    2010-06-01

    Sumatra has a high growth rate electricity energy demand from the first decade in this century. At the medium of this decade the growth is 11% per annum. On the other side capability of Government of Indonesia cq. PLN authority is limited, while many and most old existing power plants will be retired. The electricity demand growth of Sumatra is increasing the fuel consumption for several next decades. Based on several cases by vary growth scenarios and economic parameters, it shown that some kinds of fossil fuel keep to be required until next several decades. Although Sumatra has abundant coal resource, however, the other fuel types such as fuel oil, diesel, gas and nuclear are needed. On the Base Scenario and discount rate of 10%, the Sumatra System will require 11.6 million tones of coal until 2030 producing 866 TWh with cost of US10558 million. Nuclear plants produce about 501 TWh or 32% by cost of US3.1 billion. On the High Scenario and discount rate 10%, the coal consumption becomes 486.6 million tones by fuel cost of US12.7 billion producing 1033 TWh electricity energy. Nuclear fuel cost required in this scenario is US7.06 billion. The other fuel in large amount consumed is natural gas for combined cycle plants by cost of US1.38 billion producing 11.7 TWh of electricity energy on the Base Scenario and discount rate of 10%. In the High Scenario and discount rate 10% coal plants take role in power generation in Sumatra producing about 866 TWh or 54% of electricity energy. Coal consumption will be the highest on the Base Scenario with discount rate of 12% producing 756 TWh and required cost of US17.1 billion. Nuclear plants will not applicable in this scenario due to its un-competitiveness. The fuel cost will depend on nuclear power role in Sumatra system. Fuel cost will increase correspond to the increasing of coal consumption on the case where nuclear power plants not appear.

  3. MONITORED GEOLOGIC REPOSITORY LIFE CYCLE COST ESTIMATE ASSUMPTIONS DOCUMENT

    Energy Technology Data Exchange (ETDEWEB)

    R.E. Sweeney

    2001-02-08

    The purpose of this assumptions document is to provide general scope, strategy, technical basis, schedule and cost assumptions for the Monitored Geologic Repository (MGR) life cycle cost (LCC) estimate and schedule update incorporating information from the Viability Assessment (VA) , License Application Design Selection (LADS), 1999 Update to the Total System Life Cycle Cost (TSLCC) estimate and from other related and updated information. This document is intended to generally follow the assumptions outlined in the previous MGR cost estimates and as further prescribed by DOE guidance.

  4. 48 CFR 252.215-7002 - Cost estimating system requirements.

    Science.gov (United States)

    2010-10-01

    ...(2), use the following clause: Cost Estimating System Requirements (DEC 2006) (a) Definitions..., totaling $50 million or more for which cost or pricing data were required; or (2) In its fiscal year... more (but less than $50 million) for which cost or pricing data were required; and (ii) Was notified...

  5. Soft Computing Approach for Software Cost Estimation

    OpenAIRE

    Iman Attarzadeh; Siew Hock Ow

    2010-01-01

    Software metric and estimation is base on measuring of software attributes which are typically related to the product, the process and the resources of software development. One of the greatest challenges for software developers is predicting the development effort for a software system based on some metrics for the last decades. Project managers are required to the ability to give a good estimation on software development effort. Most of the traditional techniques such as function points, re...

  6. Review of storage battery system cost estimates

    Energy Technology Data Exchange (ETDEWEB)

    Brown, D.R.; Russell, J.A.

    1986-04-01

    Cost analyses for zinc bromine, sodium sulfur, and lead acid batteries were reviewed. Zinc bromine and sodium sulfur batteries were selected because of their advanced design nature and the high level of interest in these two technologies. Lead acid batteries were included to establish a baseline representative of a more mature technology.

  7. Estimating Instantaneous Energetic Cost During Gait Adaptation

    Science.gov (United States)

    2014-08-31

    cost during gait adaptation Jessica C. Selinger and J. Maxwell Donelan Department of Biomedical Physiology and Kinesiology Simon Fraser University...4986 jessica_selinger@sfu.ca     Simon Fraser University Biomedical Physiology and Kinesiology Shrum Science Center- Building K 8888

  8. Estimating the capital cost of underground car parking projects

    OpenAIRE

    Bastos, Mónica; Ribeiro, F. Loforte; Teixeira, José M. Cardoso

    2005-01-01

    Underground parking projects are expansive. The capital cost of underground parking project has been, and still is, one of the promoter's main economic concerns. Therefore, the capital cost estimation is an essential taskin the early stages pf underground parking projcts. In this context, the promoters mainly use cost estimation models, most of them produced by methodologies with lack of precision and with low performances. Over the last yeras Portugal has embarked ona a large programme of...

  9. An Analysis of Construction Cost and Schedule Performance

    Science.gov (United States)

    2008-03-01

    paradigm to develop project success measures. Griffith, Gibson, Hamilton, Tortora , and Wilson (1999 categorized projects by their cost, schedule, and...E., Hamilton, M. R., Tortora , A. L., & Wilson, C. T. (1999). Project success index for capital facility construction projects. Journal of

  10. Time Overrun and Cost Effectiveness in the Construction Industry

    Directory of Open Access Journals (Sweden)

    T.Subramani

    2014-06-01

    Full Text Available The project management technique of planning and scheduling using tools and devices are helpful in comparing the project with stipulated cost, time and quality. Resource tracking, Minimize the uncertainty and Cost Effectiveness is focused in this project. The software tool used for planning and scheduling is Primavera project planner enterprise for construction. The study covers three case studies of the process of planning, scheduling the activities and monitoring. A general re sequencing model had been proposed to overcome the delay factor from the critical area, to minimize the delay of the construction and to reduce the time, cost and it also helpful to concentrate on the major areas in the project. Re sequencing model leads the management to cost savings and make entire project success. Resource planning is one aspect, which decides the systematic execution of the project at worksite. This study is to have hands- on experience in an ongoing project, and evaluation of schedule of equipment, staff, Labor and Materials. It helps to plan and evaluate the resources for the Construction of the building project. This study also compares the cost variation due to the delay of the project and re scheduling the project by crashing process. KEYWORDS:

  11. Damage control orthopaedics: Variability of construct design for external fixation of the lower extremity and implications on cost.

    Science.gov (United States)

    Logan, Catherine; Hess, Arthur; Kwon, John Y

    2015-08-01

    To evaluate relative cost of external fixator constructs applied for damage control purposes in a cohort of advanced orthopaedic trainees and orthopaedic staff traumatologists. We also sought to evaluate physicians' understanding of component cost. Participants were asked to apply an external fixator for three separate fracture patterns in damage control fashion. A total of 19 physicians (nine PGY-4 residents, five PGY-5 residents, two orthopaedic trauma fellows and three orthopaedic staff traumatologists) participated. Total construct cost was calculated. Participants provided an estimate of the cost of each component in a fill-in format survey. Main outcome measures included cost of external fixator construct applied and the estimated cost of external fixator components. Average whole sale cost of an external fixator construct was $5252 (±$1798). Of the three fracture types examined, the tibial plafond fracture external fixator construct on average cost the most, followed by the tibial plateau fracture and the femur fracture construct. The large ex-fix combination clamp was the major contributor to cost for each construct. The combination clamp may be substituted for a multi-pin clamp, resulting in significant cost savings. The self-drilling Schanz pin and the large ex-fix combination clamp were most highly underestimated (25% and 22% of their actual cost, respectively). Innumerous construct designs exist and even small changes can significantly impact cost. Knowledge of component cost is low among staff and trainees. Education of component cost is vital to allow adequate consideration of construct design prior to fixator application. Copyright © 2015 Elsevier Ltd. All rights reserved.

  12. Construction cost prediction model for conventional and sustainable college buildings in North America

    Directory of Open Access Journals (Sweden)

    Othman Subhi Alshamrani

    2017-03-01

    Full Text Available The literature lacks in initial cost prediction models for college buildings, especially comparing costs of sustainable and conventional buildings. A multi-regression model was developed for conceptual initial cost estimation of conventional and sustainable college buildings in North America. RS Means was used to estimate the national average of construction costs for 2014, which was subsequently utilized to develop the model. The model could predict the initial cost per square feet with two structure types made of steel and concrete. The other predictor variables were building area, number of floors and floor height. The model was developed in three major stages, such as preliminary diagnostics on data quality, model development and validation. The developed model was successfully tested and validated with real-time data.

  13. REDUCTION OF COST AND TIME CONSUMPTION IN WELL-CONSTRUCTION

    Directory of Open Access Journals (Sweden)

    Mladen Zelenika

    1998-12-01

    Full Text Available A Contractor usually utilizes the available drilling equipment when constructing just one single well. Drilling cost and time consumption in constructing the well MB-1, using the percussion method, and the well MB-2, using the conventional rotary drilling method, call for a separate analysis in order to justify the investment cost for the acquisition of additional equipment for a single well only. The wells, located in a karst vrtača close to an estavelle near Tomislavgrad, with a diameter of 500 mm and approximately 80 m deep, have been accomplished with a low rate of penetration using the conventional Cable tool and resp. Rotary Drilling Method. In this paper results of analyses for the given circumstances are shown: both the efficiency and cost of the mentioned drilling methods performed by the crews of »Geotehnika d.d.« Zagreb, as well as the justifiability of investments in new equipment are evaluated.

  14. Estimating management costs of protected areas

    DEFF Research Database (Denmark)

    Green, Jonathan M.H.; Burgess, Neil David; Green, Rhys E.

    2012-01-01

    area managers in the Eastern Arc Mountains (EAMs) of Tanzania to establish how much is currently spent on reserve management and how much is required to meet conservation objectives. We use an information theoretic approach to model spatial variation in these costs using a range of plausible, spatially......Despite chronic underfunding for conservation and the recognition that funds must be invested wisely, few studies have analysed the direct costs of managing protected areas at the spatial scales needed to inform local site management. Using a questionnaire survey we collected data from protected...... explicit predictor variables, including a novel measure of anthropogenic pressure that measures the human pressure that accrues to any point in the landscape by taking into account all people in the landscape, inversely weighted by their distance to that point. Our models explain over 75% of variation...

  15. Parametric Equations for Estimating Aircraft Airframe Costs

    Science.gov (United States)

    1976-02-01

    prototype program for the first few aircraft is substantially lower because many costs are deferred until a decision to produce for inventory is made...overhead rates. It is necessary to begin with labor hours and convert tbam into dollars. That conversion can result in a serious misstatement of...general and administrative expense (G&A), miscellaneous direct charges (overtime premium, travel, per diem, miscellaneous taxes , etc.), and, in the

  16. Estimating Software-Development Costs With Greater Accuracy

    Science.gov (United States)

    Baker, Dan; Hihn, Jairus; Lum, Karen

    2008-01-01

    COCOMOST is a computer program for use in estimating software development costs. The goal in the development of COCOMOST was to increase estimation accuracy in three ways: (1) develop a set of sensitivity software tools that return not only estimates of costs but also the estimation error; (2) using the sensitivity software tools, precisely define the quantities of data needed to adequately tune cost estimation models; and (3) build a repository of software-cost-estimation information that NASA managers can retrieve to improve the estimates of costs of developing software for their project. COCOMOST implements a methodology, called '2cee', in which a unique combination of well-known pre-existing data-mining and software-development- effort-estimation techniques are used to increase the accuracy of estimates. COCOMOST utilizes multiple models to analyze historical data pertaining to software-development projects and performs an exhaustive data-mining search over the space of model parameters to improve the performances of effort-estimation models. Thus, it is possible to both calibrate and generate estimates at the same time. COCOMOST is written in the C language for execution in the UNIX operating system.

  17. 16 CFR 305.5 - Determinations of estimated annual energy consumption, estimated annual operating cost, and...

    Science.gov (United States)

    2010-01-01

    ... consumption, estimated annual operating cost, and energy efficiency rating, and of water use rate. 305.5... RULE CONCERNING DISCLOSURES REGARDING ENERGY CONSUMPTION AND WATER USE OF CERTAIN HOME APPLIANCES AND... § 305.5 Determinations of estimated annual energy consumption, estimated annual operating cost, and...

  18. Costing support and cost control in manufacturing. A cost estimation tool applied in the sheet metal domain.

    OpenAIRE

    ten Brinke, E.

    2002-01-01

    In the product development cycle several engineering tasks like design, process planning and production planning have to be executed. The execution of these tasks mainly involves information processing and decision-making. Because costs is an important factor in manufacturing, adequate information about costs is extremely valuable for all engineering tasks. Therefore, a cost estimation system for the generation of cost information and for cost control, integrated in the product development cy...

  19. COSTMODL: An automated software development cost estimation tool

    Science.gov (United States)

    Roush, George B.

    1991-01-01

    The cost of developing computer software continues to consume an increasing portion of many organizations' total budgets, both in the public and private sector. As this trend develops, the capability to produce reliable estimates of the effort and schedule required to develop a candidate software product takes on increasing importance. The COSTMODL program was developed to provide an in-house capability to perform development cost estimates for NASA software projects. COSTMODL is an automated software development cost estimation tool which incorporates five cost estimation algorithms including the latest models for the Ada language and incrementally developed products. The principal characteristic which sets COSTMODL apart from other software cost estimation programs is its capacity to be completely customized to a particular environment. The estimation equations can be recalibrated to reflect the programmer productivity characteristics demonstrated by the user's organization, and the set of significant factors which effect software development costs can be customized to reflect any unique properties of the user's development environment. Careful use of a capability such as COSTMODL can significantly reduce the risk of cost overruns and failed projects.

  20. Econometric estimation of country-specific hospital costs

    Directory of Open Access Journals (Sweden)

    Murray Christopher JL

    2003-02-01

    Full Text Available Abstract Information on the unit cost of inpatient and outpatient care is an essential element for costing, budgeting and economic-evaluation exercises. Many countries lack reliable estimates, however. WHO has recently undertaken an extensive effort to collect and collate data on the unit cost of hospitals and health centres from as many countries as possible; so far, data have been assembled from 49 countries, for various years during the period 1973–2000. The database covers a total of 2173 country-years of observations. Large gaps remain, however, particularly for developing countries. Although the long-term solution is that all countries perform their own costing studies, the question arises whether it is possible to predict unit costs for different countries in a standardized way for short-term use. The purpose of the work described in this paper, a modelling exercise, was to use the data collected across countries to predict unit costs in countries for which data are not yet available, with the appropriate uncertainty intervals. The model presented here forms part of a series of models used to estimate unit costs for the WHO-CHOICE project. The methods and the results of the model, however, may be used to predict a number of different types of country-specific unit costs, depending on the purpose of the exercise. They may be used, for instance, to estimate the costs per bed-day at different capacity levels; the "hotel" component of cost per bed-day; or unit costs net of particular components such as drugs. In addition to reporting estimates for selected countries, the paper shows that unit costs of hospitals vary within countries, sometimes by an order of magnitude. Basing cost-effectiveness studies or budgeting exercises on the results of a study of a single facility, or even a small group of facilities, is likely to be misleading.

  1. Econometric estimation of country-specific hospital costs.

    Science.gov (United States)

    Adam, Taghreed; Evans, David B; Murray, Christopher JL

    2003-02-26

    Information on the unit cost of inpatient and outpatient care is an essential element for costing, budgeting and economic-evaluation exercises. Many countries lack reliable estimates, however. WHO has recently undertaken an extensive effort to collect and collate data on the unit cost of hospitals and health centres from as many countries as possible; so far, data have been assembled from 49 countries, for various years during the period 1973-2000. The database covers a total of 2173 country-years of observations. Large gaps remain, however, particularly for developing countries. Although the long-term solution is that all countries perform their own costing studies, the question arises whether it is possible to predict unit costs for different countries in a standardized way for short-term use. The purpose of the work described in this paper, a modelling exercise, was to use the data collected across countries to predict unit costs in countries for which data are not yet available, with the appropriate uncertainty intervals.The model presented here forms part of a series of models used to estimate unit costs for the WHO-CHOICE project. The methods and the results of the model, however, may be used to predict a number of different types of country-specific unit costs, depending on the purpose of the exercise. They may be used, for instance, to estimate the costs per bed-day at different capacity levels; the "hotel" component of cost per bed-day; or unit costs net of particular components such as drugs.In addition to reporting estimates for selected countries, the paper shows that unit costs of hospitals vary within countries, sometimes by an order of magnitude. Basing cost-effectiveness studies or budgeting exercises on the results of a study of a single facility, or even a small group of facilities, is likely to be misleading.

  2. Estimating the Costs of Educating Handicapped Children: A Resource-Cost Model Approach-Summary Report.

    Science.gov (United States)

    Hartman, William T.

    1981-01-01

    The resource cost model approach makes the programmatic aspects of special education explicit and links these with associated costs. It facilitates planning for education of handicapped children. An effective cost estimation plan was necessary because of recent political and legal mandates which established the educational rights of the…

  3. Preliminary Cost Estimates of Pollution Control Technologies for Geothermal Developments

    Energy Technology Data Exchange (ETDEWEB)

    Sung, R.; Houser, G.; Richard, G.; Cotter, J.; Weller, P.; Pulaski, E.

    1979-10-01

    This is the first report from the EPA estimating the cost of technology for mitigating pollution that might arise from geothermal power systems. The Environmental Protection Agency (EPA) has taken an initial step towards the establishment of regulatory standards for the geothermal industry by preparing a document entitled Pollution Control Guidance for Geothermal Energy Development. This report supports that document by providing pollution control cost information. The objective of this report is to provide preliminary cost estimates for air and water pollution treatment and disposal technologies applicable for geothermal energy conversion systems. Cost estimates include both annualized capital investment and operation and maintenance (O&M) costs for various levels of environmental requirements. [DJE-2005

  4. Software for Estimating Costs of Testing Rocket Engines

    Science.gov (United States)

    Hines, Merlon M.

    2004-01-01

    A high-level parametric mathematical model for estimating the costs of testing rocket engines and components at Stennis Space Center has been implemented as a Microsoft Excel program that generates multiple spreadsheets. The model and the program are both denoted, simply, the Cost Estimating Model (CEM). The inputs to the CEM are the parameters that describe particular tests, including test types (component or engine test), numbers and duration of tests, thrust levels, and other parameters. The CEM estimates anticipated total project costs for a specific test. Estimates are broken down into testing categories based on a work-breakdown structure and a cost-element structure. A notable historical assumption incorporated into the CEM is that total labor times depend mainly on thrust levels. As a result of a recent modification of the CEM to increase the accuracy of predicted labor times, the dependence of labor time on thrust level is now embodied in third- and fourth-order polynomials.

  5. The Acquisition Cost-Estimating Workforce. Census and Characteristics

    Science.gov (United States)

    2009-01-01

    Abbreviations AAC Air Armament Center ACAT acquisition category ACEIT Automated Cost Estimating Integrated Tools AF Air Force AFB Air Force Base AFCAA Air...3 3 4 Automated Cost Estimating Integrated Tools ( ACEIT ) 0 1 12 6 Tecolotea training 0 0 10 5 Other 3 13 24 18 No training 18 4 29 18 Total 100 100...other sources, including AFIT, ACEIT ,9 or the contracting agency that employed them. The remain- ing 29 percent reported having received no training

  6. Guidelines and Metrics for Assessing Space System Cost Estimates

    Science.gov (United States)

    2008-01-01

    Overpass Rd. Santa Barbara , CA 93111 http:// www.technomics.net Sponsor Defense Communication Agency/Institute for Defense Analyses • • • • 117 CHAPTER...Jones, T. Capers , Estimating Software Costs, New York: McGraw-Hill, 1998. Killingsworth, Paul, “Applying Cost Improvement Theory to the Production

  7. Comprehensive investigation into historical pipeline construction costs and engineering economic analysis of Alaska in-state gas pipeline

    Science.gov (United States)

    Rui, Zhenhua

    This study analyzes historical cost data of 412 pipelines and 220 compressor stations. On the basis of this analysis, the study also evaluates the feasibility of an Alaska in-state gas pipeline using Monte Carlo simulation techniques. Analysis of pipeline construction costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary by diameter, length, volume, year, and location. Overall average learning rates for pipeline material and labor costs are 6.1% and 12.4%, respectively. Overall average cost shares for pipeline material, labor, miscellaneous, and right of way (ROW) are 31%, 40%, 23%, and 7%, respectively. Regression models are developed to estimate pipeline component costs for different lengths, cross-sectional areas, and locations. An analysis of inaccuracy in pipeline cost estimation demonstrates that the cost estimation of pipeline cost components is biased except for in the case of total costs. Overall overrun rates for pipeline material, labor, miscellaneous, ROW, and total costs are 4.9%, 22.4%, -0.9%, 9.1%, and 6.5%, respectively, and project size, capacity, diameter, location, and year of completion have different degrees of impacts on cost overruns of pipeline cost components. Analysis of compressor station costs shows that component costs, shares of cost components, and learning rates for material and labor costs vary in terms of capacity, year, and location. Average learning rates for compressor station material and labor costs are 12.1% and 7.48%, respectively. Overall average cost shares of material, labor, miscellaneous, and ROW are 50.6%, 27.2%, 21.5%, and 0.8%, respectively. Regression models are developed to estimate compressor station component costs in different capacities and locations. An investigation into inaccuracies in compressor station cost estimation demonstrates that the cost estimation for compressor stations is biased except for in the case of material costs. Overall average

  8. 48 CFR 36.605 - Government cost estimate for architect-engineer work.

    Science.gov (United States)

    2010-10-01

    ... for architect-engineer work. 36.605 Section 36.605 Federal Acquisition Regulations System FEDERAL ACQUISITION REGULATION SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 36.605 Government cost estimate for architect-engineer work. (a) An...

  9. 48 CFR 1336.605 - Government cost estimate for architect-engineer work.

    Science.gov (United States)

    2010-10-01

    ... for architect-engineer work. 1336.605 Section 1336.605 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 1336.605 Government cost estimate for architect-engineer work. After award,...

  10. 48 CFR 736.605 - Government cost estimate for architect-engineer work.

    Science.gov (United States)

    2010-10-01

    ... for architect-engineer work. 736.605 Section 736.605 Federal Acquisition Regulations System AGENCY FOR INTERNATIONAL DEVELOPMENT SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Services 736.605 Government cost estimate for architect-engineer work. See 736.602-3(c)(5)....

  11. 48 CFR 436.605 - Government cost estimate for architect-engineer work.

    Science.gov (United States)

    2010-10-01

    ... for architect-engineer work. 436.605 Section 436.605 Federal Acquisition Regulations System DEPARTMENT OF AGRICULTURE SPECIAL CATEGORIES OF CONTRACTING CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS Architect-Engineer Service 436.605 Government cost estimate for architect-engineer work. The...

  12. An Integrated BIM and Cost Estimating Blended Learning Model--Acceptance Differences between Experts and Novice

    Science.gov (United States)

    Wu, Yun-Wu; Wen, Ming-Hui; Chen, Ching-Ming; Hsu, I-Ting

    2016-01-01

    "Building information technology" and "cost estimating" are two core skills of construction education. However, in traditional education, students learn these two important subjects in separate courses. This study proposes a blended learning environment which can provide students with support for their face-to-face learning…

  13. The Importance of Safety in Construction Sector: Costs of Occupational Accidents in Construction Sites

    Directory of Open Access Journals (Sweden)

    Fatih Yılmaz

    2015-04-01

    Full Text Available Occupational accidents cause important social and economic problems by loss of life and physical injuries. Construction sector involves high risk due to its production processes and labor intensive characteristic and because of occupational accidents the sector brings up against financial loss in large scale. In developing countries, construction sector is one of the most important sectors that have a great contribution to economic development with its employment capacity and added-value to the economy. On the other hand, due to the lack of preventive measures, occupational accidents occur, frequently in construction in Turkey. Major occupational accidents are defined as the cause of serious injuries and a long-term disability; minor occupational accidents are defined as the cause of insignificant injuries and short-term disability. Minor occupational accidents are not considered sufficiently, they are even not kept as a record. It is known that minor occupational accidents, which are not considered sufficiently and even not registered, cause great financial loss in workplaces. The aim of this paper is to investigate the cost of workforce loss caused by the accidents in construction sites by using the statistics of three construction sites in Turkey and to compare the financial losses of minor and major occupational accidents. In this study, three construction project are investigated in Turkey in 2009 and it is obtained that the cost of workday loss caused by major occupational accidents is 19431.75 $ and minor occupational accidents cause a loss of 6924.25 $. The cost of workday loss caused by minor occupational accidents are almost 35 % of major workday losses’. These costs presents the importance of preventive measures for workers’ health and safety in construction.

  14. THE COST CONTROL BY APPLYING THE TARGET COSTING METHOD IN THE CONSTRUCTION INDUSTRY

    Directory of Open Access Journals (Sweden)

    Radu MĂRGINEAN

    2014-04-01

    Full Text Available The Romanian economic spectrum considered on a slightly increasing trend in the general aspects of the national economy, feels increasingly the need for a development in the cost management issue. One of the modern methods of cost calculation that can fill this gap in the Romanian business practice in management accounting is the target costing method. The overall objective of this case study is to demonstrate the applicability and usefulness of this method in the cost controlling activity, widely used in the field of managerial accounting practice in the developed economies. The financial accounting and the managerial accounting converge in terms of ultimate interest for the company, i.e. value creation and performance increase in a sustainable way. After performing the case study with real financial data, we conclude that the target costing method is applicable and particularly useful in the construction industry and the results may provide support for decision-makers.

  15. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    Energy Technology Data Exchange (ETDEWEB)

    Ruth, M.

    2011-10-01

    This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

  16. Hydrogen Production Cost Estimate Using Biomass Gasification: Independent Review

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2011-10-01

    This independent review is the conclusion arrived at from data collection, document reviews, interviews and deliberation from December 2010 through April 2011 and the technical potential of Hydrogen Production Cost Estimate Using Biomass Gasification. The Panel reviewed the current H2A case (Version 2.12, Case 01D) for hydrogen production via biomass gasification and identified four principal components of hydrogen levelized cost: CapEx; feedstock costs; project financing structure; efficiency/hydrogen yield. The panel reexamined the assumptions around these components and arrived at new estimates and approaches that better reflect the current technology and business environments.

  17. Factors Affecting Construction Cost in Mara Large Construction Project: Perspective of Project Management Consultant

    Directory of Open Access Journals (Sweden)

    Aftab Hameed Memon

    2011-07-01

    Full Text Available Project cost is one of the most important criteria of success of project and is of high concern to those who are involved in the construction industry. However, studies show that rarely projects are complete within stipulated budget. This study is focusing on identification of significant causes affecting construction cost in MARA large projects. This paper presents the results of a questionnaire survey conducted among the personnel of Project Management Consultant (PMC. Data was analyzed with statistical tools to determine the rank of factors affecting construction cost. It is concluded that cash flow and financial difficulties faced by contractors, contractor's poor site management and supervision, inadequate contractor experience, shortage of site workers, incorrect planning and scheduling by contractors are most severe factors while changes in scope of project and frequent design changes are least affecting factors on construction cost. Spearman correlation analysis showed that incorrect planning and scheduling by contractor has strong positive relationship with contractor’s poor site management and supervision, inadequate experience of contractors has strong positive relationship with incorrect planning and scheduling; and contractor’s poor site management and supervision, changes in scope of project has strong positive relationship with frequent design changes; and vice versa.

  18. Estimating Production Cost While Linking Combat Systems and Ship Design

    Science.gov (United States)

    2012-12-01

    42  1.  Royal Thai Navy CDR Peerapong’s MIO Simulation ....................42  2.  LT Joe Ashpari of the United States...Estimates for MIO Simulation Output Analysis ......................................45  Table 12.  Cost Estimates for SAR Simulation Output Analysis...Systems Engineering JIC Joint Inflation Calculator MBSE Model Based System Engineering MIO Maritime Interdiction Operations MOE Measure of

  19. A New Schedule Estimation Technique for Construction Projects

    OpenAIRE

    D. H. Warburton, Roger

    2014-01-01

    Allen studied hundreds of construction projects and developed an accu-rate, practically useful model of their labor profiles. We combine Al-len’s labor profile with standard Earned Value Management (EVM) techniques and derive a simple, practical formula that estimates the fi-nal schedule from early project data. The schedule estimation formula is exact; it requires no approximations. The estimate is also surprisingly accurate and available early enough in the project for the project manager ...

  20. Fuel Cell System for Transportation -- 2005 Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Wheeler, D.

    2006-10-01

    Independent review report of the methodology used by TIAX to estimate the cost of producing PEM fuel cells using 2005 cell stack technology. The U.S. Department of Energy (DOE) Hydrogen, Fuel Cells and Infrastructure Technologies Program Manager asked the National Renewable Energy Laboratory (NREL) to commission an independent review of the 2005 TIAX cost analysis for fuel cell production. The NREL Systems Integrator is responsible for conducting independent reviews of progress toward meeting the DOE Hydrogen Program (the Program) technical targets. An important technical target of the Program is the proton exchange membrane (PEM) fuel cell cost in terms of dollars per kilowatt ($/kW). The Program's Multi-Year Program Research, Development, and Demonstration Plan established $125/kW as the 2005 technical target. Over the last several years, the Program has contracted with TIAX, LLC (TIAX) to produce estimates of the high volume cost of PEM fuel cell production for transportation use. Since no manufacturer is yet producing PEM fuel cells in the quantities needed for an initial hydrogen-based transportation economy, these estimates are necessary for DOE to gauge progress toward meeting its targets. For a PEM fuel cell system configuration developed by Argonne National Laboratory, TIAX estimated the total cost to be $108/kW, based on assumptions of 500,000 units per year produced with 2005 cell stack technology, vertical integration of cell stack manufacturing, and balance-of-plant (BOP) components purchased from a supplier network. Furthermore, TIAX conducted a Monte Carlo analysis by varying ten key parameters over a wide range of values and estimated with 98% certainty that the mean PEM fuel cell system cost would be below DOE's 2005 target of $125/kW. NREL commissioned DJW TECHNOLOGY, LLC to form an Independent Review Team (the Team) of industry fuel cell experts and to evaluate the cost estimation process and the results reported by TIAX. The results of

  1. Estimation of construction waste generation and management in Thailand.

    Science.gov (United States)

    Kofoworola, Oyeshola Femi; Gheewala, Shabbir H

    2009-02-01

    This study examines construction waste generation and management in Thailand. It is estimated that between 2002 and 2005, an average of 1.1 million tons of construction waste was generated per year in Thailand. This constitutes about 7.7% of the total amount of waste disposed in both landfills and open dumpsites annually during the same period. Although construction waste constitutes a major source of waste in terms of volume and weight, its management and recycling are yet to be effectively practiced in Thailand. Recently, the management of construction waste is being given attention due to its rapidly increasing unregulated dumping in undesignated areas, and recycling is being promoted as a method of managing this waste. If effectively implemented, its potential economic and social benefits are immense. It was estimated that between 70 and 4,000 jobs would have been created between 2002 and 2005, if all construction wastes in Thailand had been recycled. Additionally it would have contributed an average savings of about 3.0 x 10(5) GJ per year in the final energy consumed by the construction sector of the nation within the same period based on the recycling scenario analyzed. The current national integrated waste management plan could enhance the effective recycling of construction and demolition waste in Thailand when enforced. It is recommended that an inventory of all construction waste generated in the country be carried out in order to assess the feasibility of large scale recycling of construction and demolition waste.

  2. A case-based reasoning approach for estimating the costs of pump station projects

    Directory of Open Access Journals (Sweden)

    Mohamed M. Marzouk

    2011-10-01

    Full Text Available The effective estimation of costs is crucial to the success of construction projects. Cost estimates are used to evaluate, approve and/or fund projects. Organizations use some form of classification system to identify the various types of estimates that may be prepared during the lifecycle of a project. This research presents a parametric-cost model for pump station projects. Fourteen factors have been identified as important to the influence of the cost of pump station projects. A data set that consists of forty-four pump station projects (fifteen water and twenty-nine waste water are collected to build a Case-Based Reasoning (CBR library and to test its performance. The results obtained from the CBR tool are processed and adopted to improve the accuracy of the results. A numerical example is presented to demonstrate the development of the effectiveness of the tool.

  3. Feasibility of perpetual pavement stage construction in China: A life cycle cost analysis

    OpenAIRE

    Guo, Zhongyin; Sultan, Saud A.

    2017-01-01

    The main objective of pavement design and management is to build sustainable pavement structure with minimum costs during its whole life. There are many uncertainties in the process of pavement design pertaining many of its variables, such as future traffic estimation, long time behavior of materials, future weights and types of traveling vehicles, availability of funds etc. Therefore, it is important to apply pavement stage construction technique during the process of pavement design and man...

  4. Using inpainting to construct accurate cut-sky CMB estimators

    CERN Document Server

    Gruetjen, H F; Liguori, M; Shellard, E P S

    2015-01-01

    The direct evaluation of manifestly optimal, cut-sky CMB power spectrum and bispectrum estimators is numerically very costly, due to the presence of inverse-covariance filtering operations. This justifies the investigation of alternative approaches. In this work, we mostly focus on an inpainting algorithm that was introduced in recent CMB analyses to cure cut-sky suboptimalities of bispectrum estimators. First, we show that inpainting can equally be applied to the problem of unbiased estimation of power spectra. We then compare the performance of a novel inpainted CMB temperature power spectrum estimator to the popular apodised pseudo-$C_l$ (PCL) method and demonstrate, both numerically and with analytic arguments, that inpainted power spectrum estimates significantly outperform PCL estimates. Finally, we study the case of cut-sky bispectrum estimators, comparing the performance of three different approaches: inpainting, apodisation and a novel low-l leaning scheme. Providing an analytic argument why the loca...

  5. Budget estimates: Fiscal year 1994. Volume 2: Construction of facilities

    Science.gov (United States)

    1994-01-01

    The Construction of Facilities (CoF) appropriation provides contractual services for the repair, rehabilitation, and modification of existing facilities; the construction of new facilities and the acquisition of related collateral equipment; the acquisition or condemnation of real property; environmental compliance and restoration activities; the design of facilities projects; and advanced planning related to future facilities needs. Fiscal year 1994 budget estimates are broken down according to facility location of project and by purpose.

  6. Estimation of traffic accident costs: a prompted model.

    Science.gov (United States)

    Hejazi, Rokhshad; Shamsudin, Mad Nasir; Radam, Alias; Rahim, Khalid Abdul; Ibrahim, Zelina Zaitun; Yazdani, Saeed

    2013-01-01

    Traffic accidents are the reason for 25% of unnatural deaths in Iran. The main objective of this study is to find a simple model for the estimation of economic costs especially in Islamic countries (like Iran) in a straightforward manner. The model can show the magnitude of traffic accident costs with monetary equivalent. Data were collected from different sources that included traffic police records, insurance companies and hospitals. The conceptual framework, in our study, was based on the method of Ayati. He used this method for the estimation of economic costs in Iran. We promoted his method via minimum variables. Our final model has only three available variables which can be taken from insurance companies and police records. The running model showed that the traffic accident costs were US$2.2 million in 2007 for our case study route.

  7. Estimating the Costs of Educating Handicapped Children: A Resource-Cost Model Approach. Final Report.

    Science.gov (United States)

    Hartman, William T.

    The research described in this report attempts to estimate the costs of providing an appropriate education to all school-aged handicapped children by 1980-81. The study begins by addressing the aspects of special education that will help to predict future costs--patterns of growth to the present, legal and political mandates, the nature of various…

  8. Estimating the mental health costs of racial discrimination.

    Science.gov (United States)

    Elias, Amanuel; Paradies, Yin

    2016-11-29

    Racial discrimination is a pervasive social problem in several advanced countries such as the U.S., U.K., and Australia. Public health research also indicates a range of associations between exposure to racial discrimination and negative health, particularly, mental health including depression, anxiety, and post-traumatic stress disorder (PTSD). However, the direct negative health impact of racial discrimination has not been costed so far although economists have previously estimated indirect non-health related productivity costs. In this study, we estimate the burden of disease due to exposure to racial discrimination and measure the cost of this exposure. Using prevalence surveys and data on the association of racial discrimination with health outcomes from a global meta-analysis, we apply a cost of illness method to measure the impact of racial discrimination. This estimate indicates the direct health cost attributable to racial discrimination and we convert the estimates to monetary values based on conventional parameters. Racial discrimination costs the Australian economy 235,452 in disability adjusted life years lost, equivalent to $37.9 billion per annum, roughly 3.02% of annual gross domestic product (GDP) over 2001-11, indicating a sizeable loss for the economy. Substantial cost is incurred due to increased prevalence of racial discrimination as a result of its association with negative health outcomes (e.g. depression, anxiety and PTSD). This implies that potentially significant cost savings can be made through measures that target racial discrimination. Our research contributes to the debate on the social impact of racial discrimination, with implications for policies and efforts addressing it.

  9. Estimating incremental costs with skew: a cautionary note.

    Science.gov (United States)

    Polgreen, Linnea A; Brooks, John M

    2012-09-01

    Cost data in healthcare are often skewed across patients. Thus, researchers have used either a log transformation of the dependent variable or generalized linear models with log links. However, frequently these non-linear approaches produce non-linear incremental effects: the incremental effects differ at different levels of the covariates, and this can cause dramatic effects on predicted cost. The aim of this study was to demonstrate that when modelling skewed data, log link functions or log transformations are not necessary and have unintended effects. We simulated cost data using a linear model with a 'treatment', a covariate and a specified number of observations with excessive cost (skewed data). We also used actual data from a pain-relief intervention among hip-replacement patients. We then estimated cost models using various functional approaches suggested to handle skew and calculated the incremental cost of treatment at various levels of the covariate(s). All of these methods provide unbiased estimates of the incremental effect of treatment on costs at the mean level of the covariate. However, in some log-based models the implied incremental treatment cost doubled between extreme low and high values of the covariate in a manner inconsistent with the underlying linear model. Although specification checks are always needed, the potential for misleading incremental estimates resulting from log-based specifications is often ignored. In this era of cost containment and comparisons of treatment effectiveness it is vital that researchers and policymakers understand the limitation of the inferences that can be made using log-based models for patients whose characteristics differ from the sample mean.

  10. Robust guaranteed-cost adaptive quantum phase estimation

    Science.gov (United States)

    Roy, Shibdas; Berry, Dominic W.; Petersen, Ian R.; Huntington, Elanor H.

    2017-05-01

    Quantum parameter estimation plays a key role in many fields like quantum computation, communication, and metrology. Optimal estimation allows one to achieve the most precise parameter estimates, but requires accurate knowledge of the model. Any inevitable uncertainty in the model parameters may heavily degrade the quality of the estimate. It is therefore desired to make the estimation process robust to such uncertainties. Robust estimation was previously studied for a varying phase, where the goal was to estimate the phase at some time in the past, using the measurement results from both before and after that time within a fixed time interval up to current time. Here, we consider a robust guaranteed-cost filter yielding robust estimates of a varying phase in real time, where the current phase is estimated using only past measurements. Our filter minimizes the largest (worst-case) variance in the allowable range of the uncertain model parameter(s) and this determines its guaranteed cost. It outperforms in the worst case the optimal Kalman filter designed for the model with no uncertainty, which corresponds to the center of the possible range of the uncertain parameter(s). Moreover, unlike the Kalman filter, our filter in the worst case always performs better than the best achievable variance for heterodyne measurements, which we consider as the tolerable threshold for our system. Furthermore, we consider effective quantum efficiency and effective noise power, and show that our filter provides the best results by these measures in the worst case.

  11. Cost benchmarking of railway projects in Europe – dealing with uncertainties in cost estimates

    DEFF Research Database (Denmark)

    Trabo, Inara

    transport infrastructure projects, 9 projects out of 10 came out with budget overruns. As an example of cost overruns is the High Speed 1 in UK, the railway line between London and the British end of the Channel Tunnel. The project was delayed for 11 months and final construction costs were escalated to 80......Past experiences in the construction of high-speed railway projects demontrate either positive or negative financial outcomes of the actual project’s budget. Usually some uncertainty value is included into initial budget calculations. Uncertainty is related to the increase of material prices......, Italian projects have productive experiences in constructing and operating high-speed railway lines. The case study for this research is the first Danish high-speed railway line “The New Line Copenhagen-Ringsted”. The project’s aim is to avoid cost overruns and even make lower the final budget outcomes...

  12. SUBSTANTIATION OF THE COST OF HOUSING CONSTRUCTION INCLUDING THE FACTOR OF INVESTMENT ATTRACTIVENESS OF TERRITORIES

    Directory of Open Access Journals (Sweden)

    ZAIATS Yi. I.

    2015-11-01

    Full Text Available Problem statement. For planning and organization of urban construction is necessary to analyze the use of areas. Territorial resources of the city, being used for construction and other urban purposes, consists of plots of land: disposable, reserved and undeveloped in previous years of construction in progress; residential districts and blocks of obsolete housing fund; industrial and municipal and warehouse enterprises being used irrationally or stopped to work; the defence department, where the amortized warehouses and other main funds are that are not used by purpose; agricultural enterprises where the obsolete industrial funds, haying, nurseries, greenhouses. The number of free areas suitable for future urban development is extremely limited. However a considerable part of the territories of almost all functional zones is used inefficiently. Purpose. Formalization of a factor of investment attractiveness of territories for the further identification and research of the connection between it and the cost of housing construction is necessary. Conclusion. The identification of regularities of influence of the factor of investment attractiveness of territories on the cost of construction of high-rise buildings allow to obtain a quantitative estimate of this effect and can be used in the development of the methodology of substantiation of the expediency and effectiveness of the implementation of highrise construction projects, based on organizational and technological aspects.

  13. Magnitude of Construction Cost and Schedule Overruns in Public Work Projects

    OpenAIRE

    Pramen P. Shrestha; Burns, Leslie A.; Shields, David R.

    2013-01-01

    This study analyzed 363 Clark County Department of Public Works (CCDPW) projects to determine construction cost and schedule overruns in various types and sizes of the projects. The sample projects were constructed from 1991 to 2008, with a total construction cost of $1.85 billion, equivalent to 2012 cost. A one-factor ANOVA test was conducted to determine whether construction cost and schedule overruns significantly varied based on types and sizes of the projects. The study showed that lar...

  14. Improvement of Cost Calculation in Constructions – Application of the Standard Cost Method

    Directory of Open Access Journals (Sweden)

    Adela Breuer

    2010-12-01

    Full Text Available Grace to the analysis of several commercial companies effectively performed “on the field”, we could remark the necessity to change the method of cost calculation, our motivation being related to the simplification of calculations and the reduction of the labour volume, but especially the necessity to know in due time the deviations occurred as well as the causes having led to their apparition. The importance of knowing the deviations in due time results from the very basic characteristics of the constructions execution, i.e. the performance of works during several budgetary years, which leads to the modifications of prices and materials, the introduction of new technologies, and to the performance of open air activities, making the execution of constructions works be influenced by the atmospheric condition. But the most important aspect of knowing the deviations is the correct determination of expenses and their inscribing in the corresponding period, in view of determining the result of the budgetary year. Our proposal for the enhancement of the method of cost calculation in constructions is the application of the standard cost method in the variant “single standard cost”.

  15. Influential Factors in Estimating and Tendering for Construction Work

    Directory of Open Access Journals (Sweden)

    Choon Toh Tien

    2016-01-01

    Full Text Available Cost estimation, bid/no bid decision, estimating accuracy, and cost overrun are the four main cost estimating issues (MCEI investigated by many previous researchers from different parts of the world for decades. Factors relating to client characteristics, consultant and design parameters, contractor attributes, project characteristics, contract procedures and procurement methods, and external market conditions [1] are examined for their influences on those four MCEI separately. However, very little attention is paid on the comparison of factors rankings across those four MCEI. Results from comparing those factors rankings improve the understandings on cost estimating issues. Thus, this study aims to compare the factors rankings across the four MCEI and evaluate the degree of agreement between the four sets of ranks for their influential factors. Four previous studies, each examining factors affecting each of the four MCEI are selected through literature survey for analysis. Influential factors from each previous study are assigned to their related categories: client, consultant, contractor, project, contract, and environment. Kendall’s coefficient of concordance is used to assess interjudge reliability. The computed correlation indicates a moderate degree of association between the four sets of ranks. It is found that the four MCEI are influenced by different factors with different ranks and hence should be treated as different MCEI and be managed differently.

  16. Estimating the extra cost of living with disability in Vietnam.

    Science.gov (United States)

    Minh, Hoang Van; Giang, Kim Bao; Liem, Nguyen Thanh; Palmer, Michael; Thao, Nguyen Phuong; Duong, Le Bach

    2015-01-01

    Disability is shown to be both a cause and a consequence of poverty. However, relatively little research has investigated the economic cost of living with a disability. This study reports the results of a study on the extra cost of living with disability in Vietnam in 2011. The study was carried out in eight cities/provinces in Vietnam, including Hanoi and Ho Chi Minh cities (two major metropolitan in Vietnam) and six provinces from each of the six socio-economic regions in Vietnam. Costs are estimated using the standard of living approach whereby the difference in incomes between people with disability and those without disability for a given standard of living serves as a proxy for the cost of living with disability. The extra cost of living with disability in Vietnam accounted for about 8.8-9.5% of annual household income, or valued about US$200-218. Communication difficulty was shown to result in highest additional cost of living with disability and self-care difficulty was shown to lead to the lowest levels of extra of living cost. The extra cost of living with disability increased as people had more severe impairment. Interventions to promote the economic security of livelihood for people with disabilities are needed.

  17. An Instructional Cost Estimation Model for the XYZ Community College.

    Science.gov (United States)

    Edmonson, William F.

    An enrollment-driven model for estimating instructional costs is presented in this paper as developed by the Western Interstate Commission for Higher Education (WICHE). After stating the principles of the WICHE planning system (i.e., various categories of data are gathered, segmented, and then cross-tabulated against one another to yield certain…

  18. Stochastic Estimation of Cost Frontier: Evidence from Bangladesh

    Science.gov (United States)

    Mamun, Shamsul Arifeen Khan

    2012-01-01

    In the literature of higher education cost function study, enough knowledge is created in the area of economy scale in the context of developed countries but the knowledge of input demand is lacking. On the other hand, empirical knowledge in the context of developing countries is very meagre. The paper fills up the knowledge gap, estimating a…

  19. Cost Estimation for Cross-organizational ERP Projects: Research Perspectives

    NARCIS (Netherlands)

    Daneva, M.; Wieringa, R.J.; Bieman, J.

    2008-01-01

    There are many methods for estimating size, effort, schedule and other cost aspects of IS projects, but only one specifically developed for Enterprise Resource Planning (ERP) [67] and none for simultaneous, interdependent ERP projects in a cross-organizational context. The objective of this paper is

  20. Design and cost estimation of the ASACUSA dipole magnets (PXMCXAFWAC)

    CERN Document Server

    Newborough, Antony

    2011-01-01

    This note describes the design and cost estimation for two horizontal bending magnets (PXMCXAFWAC) needed upstream of the ASACUSA experiment of the CERN AD (Antiproton Decelerator) Machine. These magnets are to replace the two corrector magnets (PXMCCAVWAP) which do not fulfil the requirements in terms of free horizontal aperture and field quality.

  1. Cost Estimation for Cross-organizational ERP Projects: Research Perspectives

    NARCIS (Netherlands)

    Daneva, Maia; Bieman, J.; Wieringa, Roelf J.

    There are many methods for estimating size, effort, schedule and other cost aspects of IS projects, but only one specifically developed for Enterprise Resource Planning (ERP) [67] and none for simultaneous, interdependent ERP projects in a cross-organizational context. The objective of this paper is

  2. Stochastic Estimation of Cost Frontier: Evidence from Bangladesh

    Science.gov (United States)

    Mamun, Shamsul Arifeen Khan

    2012-01-01

    In the literature of higher education cost function study, enough knowledge is created in the area of economy scale in the context of developed countries but the knowledge of input demand is lacking. On the other hand, empirical knowledge in the context of developing countries is very meagre. The paper fills up the knowledge gap, estimating a…

  3. Feasibility of perpetual pavement stage construction in China: A life cycle cost analysis

    Directory of Open Access Journals (Sweden)

    Zhongyin Guo

    2016-12-01

    Full Text Available The main objective of pavement design and management is to build sustainable pavement structure with minimum costs during its whole life. There are many uncertainties in the process of pavement design pertaining many of its variables, such as future traffic estimation, long time behavior of materials, future weights and types of traveling vehicles, availability of funds etc. Therefore, it is important to apply pavement stage construction technique during the process of pavement design and management to minimize the risk associated with these uncertainties. From the beginning of 2000, the research and application of perpetual asphalt pavement (PP technology has been deployed in China. The semi rigid base for asphalt pavement has been normally considered as typical component of high class highways in the design according to the Chinese experience since 1997. The research objective is to apply pavement stage construction for the evaluation of life cycle costs of Chinese perpetual and traditional semi rigid pavements using operational pavement management system in addition to examine its suitability for design and construction of more economical and durable flexible pavements. It has been found that the stage construction of asphalt layers in PP over semi rigid pavement foundation will create more sustainable and trusted pavement structures in spite of 2–5% increase in present total cost.

  4. The economic costs of radiation-induced health effects: Estimation and simulation

    Energy Technology Data Exchange (ETDEWEB)

    Nieves, L.A.; Tawil, J.J.

    1988-08-01

    This effort improves the quantitative information available for use in evaluating actions that alter health risks due to population exposure to ionizing radiation. To project the potential future costs of changes in health effects risks, Pacific Northwest Laboratory (PNL) constructed a probabilistic computer model, Health Effects Costs Model (HECOM), which utilizes the health effect incidence estimates from accident consequences models to calculate the discounted sum of the economic costs associated with population exposure to ionizing radiation. Application of HECOM to value-impact and environmental impact analyses should greatly increase the quality of the information available for regulatory decision making. Three major types of health effects present risks for any population sustaining a significant radiation exposure: acute radiation injuries (and fatalities), latent cancers, and impairments due to genetic effects. The literature pertaining to both incidence and treatment of these health effects was reviewed by PNL and provided the basis for developing economic cost estimates. The economic costs of health effects estimated by HECOM represent both the value of resources consumed in diagnosing, treating, and caring for the patient and the value of goods not produced because of illness or premature death due to the health effect. Additional costs to society, such as pain and suffering, are not included in the PNL economic cost measures since they do not divert resources from other uses, are difficult to quantify, and do not have a value observable in the marketplace. 83 refs., 3 figs., 19 tabs.

  5. Estimation of Social Benefits in Cost-benefit Analysis

    OpenAIRE

    Beáta Fodor

    2012-01-01

    While examining the cost-benefit analysis related to public policy decisions in the Hungarian and international literature, this paper is looking for the answer to the question of what the methodological principles are according to which the benefit impacts can be determined. The processed Hungarian and English-language studies indicate that the theoretical-methodological questions of the determination of benefit impacts are not clear cut. The author has constructed a model that contains the ...

  6. ICPP calcined solids storage facility closure study. Volume II: Cost estimates, planning schedules, yearly cost flowcharts, and life-cycle cost estimates

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This document contains Volume II of the Closure Study for the Idaho Chemical Processing Plant Calcined Solids Storage Facility. This volume contains draft information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs for the four options described in Volume I: (1) Risk-Based Clean Closure; NRC Class C fill, (2) Risk-Based Clean Closure; Clean fill, (3) Closure to landfill Standards; NRC Class C fill, and (4) Closure to Landfill Standards; Clean fill.

  7. A REVIEW OF ESTIMATION OF SOFTWARE PRODUCTS DEVELOPMENT COSTS

    Directory of Open Access Journals (Sweden)

    Edin Osmanbegović

    2017-01-01

    Full Text Available In the modern business and management of business processes, the standardization of procedures allows the creation of added value, increasing competitiveness and success in the business of an organization. Evaluation of the budget for software development is crucial to the success of an IT project, because the inability to make a realistic assessment leads to inadequate project plans, customer dissatisfaction, poor quality of software products, and reduced profits. In order to minimize such situations, making accurate and reliable software cost estimation should be carried out at all stages of the project life cycle. Although hundreds of research articles focusing on the application of different methods of budget estimates of the software product have been published so far, there is no comprehensive review of the current situation or review of research trends in the budget estimates of the software product. This paper aims to create a framework for estimation of costs of development of software products by providing an overview of the most influential researchers, the most influential articles published in the WoS database, the most used keywords for searching the articles, as well as a review of the estimation techniques used in budget estimates of the software product.

  8. A Modified Cost Estimation Formulae for Calculating Manufacturing Cost of Injection Part/Mold

    Institute of Scientific and Technical Information of China (English)

    2002-01-01

    In modern society, a plastic part has its own important position. To the managers and decision-makers in the field of plastic component, how to decide the manufacturing cost of the injection part or injection mold as quickly as possible is most valuable. Cost estimation formulae (CEF) are the most common method to evaluate the cost of injection part/mold, which is similar to our ordinary thinking. In this paper, a CEF method used by Dr. Weiyi Hu in Massachusetts University is first discussed. To the problems existed in the formulae, we propose an improved algorithm. This algorithm can be used to estimate the manufacturing cost of injection part/mold accurately in the early design stage.

  9. Industrial Construction Methods for Cost-Effective and Sustainable Multi-Storey Buildings

    OpenAIRE

    Pourghazian, Hanif

    2008-01-01

    Reduction of the cost of construction is a constant goal for the building industry. One way of reducing the construction cost of buildings is to develop building technologies that will give increased productivity. Reduced construction time at the building-site and waste of materials and resources contribute to furtherreduction of the costs. This is why the sector is developing towards more industrialized construction methods with prefabricated components. The objective of this thesis is devel...

  10. Estimating boiling water reactor decommissioning costs: A user`s manual for the BWR Cost Estimating Computer Program (CECP) software. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bierschbach, M.C. [Pacific Northwest National Lab., Richland, WA (United States)

    1996-06-01

    Nuclear power plant licensees are required to submit to the US Nuclear Regulatory Commission (NRC) for review their decommissioning cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning boiling water reactor (BWR) power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.

  11. Estimating boiling water reactor decommissioning costs. A user`s manual for the BWR Cost Estimating Computer Program (CECP) software: Draft report for comment

    Energy Technology Data Exchange (ETDEWEB)

    Bierschbach, M.C. [Pacific Northwest Lab., Richland, WA (United States)

    1994-12-01

    With the issuance of the Decommissioning Rule (July 27, 1988), nuclear power plant licensees are required to submit to the U.S. Regulatory Commission (NRC) for review, decommissioning plans and cost estimates. This user`s manual and the accompanying Cost Estimating Computer Program (CECP) software provide a cost-calculating methodology to the NRC staff that will assist them in assessing the adequacy of the licensee submittals. The CECP, designed to be used on a personal computer, provides estimates for the cost of decommissioning BWR power stations to the point of license termination. Such cost estimates include component, piping, and equipment removal costs; packaging costs; decontamination costs; transportation costs; burial costs; and manpower costs. In addition to costs, the CECP also calculates burial volumes, person-hours, crew-hours, and exposure person-hours associated with decommissioning.

  12. 25 CFR Appendix D to Subpart C - Cost To Construct

    Science.gov (United States)

    2010-04-01

    ... would meet the Adequate Standard Characteristics (see Table 1). For roadways, the recommended design of... Costs, Pavement Costs, and Incidental Costs. For bridges, costs are derived from costs in the National...) with inadequate drainage and alignment that generally follows existing ground 100 4 A designed...

  13. Cost Estimation of Laser Additive Manufacturing of Stainless Steel

    Science.gov (United States)

    Piili, Heidi; Happonen, Ari; Väistö, Tapio; Venkataramanan, Vijaikrishnan; Partanen, Jouni; Salminen, Antti

    Laser additive manufacturing (LAM) is a layer wise fabrication method in which a laser beam melts metallic powder to form solid objects. Although 3D printing has been invented 30 years ago, the industrial use is quite limited whereas the introduction of cheap consumer 3D printers, in recent years, has familiarized the 3D printing. Interest is focused more and more in manufacturing of functional parts. Aim of this study is to define and discuss the current economic opportunities and restrictions of LAM process. Manufacturing costs were studied with different build scenarios each with estimated cost structure by calculated build time and calculating the costs of the machine, material and energy with optimized machine utilization. All manufacturing and time simulations in this study were carried out with a research machine equal to commercial EOS M series equipment. The study shows that the main expense in LAM is the investment cost of the LAM machine, compared to which the relative proportions of the energy and material costs are very low. The manufacturing time per part is the key factor to optimize costs of LAM.

  14. 48 CFR 1852.216-85 - Estimated cost and award fee.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost and award... and Clauses 1852.216-85 Estimated cost and award fee. As prescribed in 1816.406-70(e), insert the following clause: Estimated Cost and Award Fee (SEP 1993) The estimated cost of this contract is $___....

  15. 48 CFR 1852.216-74 - Estimated cost and fixed fee.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost and fixed... and Clauses 1852.216-74 Estimated cost and fixed fee. As prescribed in 1816.307-70(b), insert the following clause: Estimated Cost and Fixed Fee (DEC 1991) The estimated cost of this contract...

  16. Cost estimation of CO2 removal in HYSYS

    OpenAIRE

    Kallevik, Ove Braut

    2010-01-01

    A Hysys simulation of a CO2 capture process by absorption in a monoethanol amine (MEA) solution from the flue gas from a 500 MW natural gas power plant has been developed as a verification of earlier simulations at TUC. The major improvements in this work are new calculation methods for make-up water and MEA and simulation of a direct contact cooler (DCC) unit. For cost estimation purposes, calculations of overall heat transfer coefficient and correction factor for heat exchan...

  17. Estimation of increased regional income that emanates from economically justified road construction projects

    Directory of Open Access Journals (Sweden)

    W. J. Pienaar

    2005-09-01

    Full Text Available This article identifies the possible development benefits than can emanate from economically justified road construction projects. It shows how the once-off increase in regional income resulting from investment in road construction projects, and the recurring additional regional income resulting from the use of new or improved roads can be estimated. The difference is shown that exists between a cost-benefit analysis (to determine how economically justified a project is and a regional economic income analysis (to estimate the general economic benefits that will be developed by investment in and usage of a road. Procedures are proposed through which the once-off and recurring increases in regional income can be estimated by using multiplier and accelerator analyses respectively. Finally guidelines are supplied on the appropriate usage of input variables in the calculation of the regional income multiplier.

  18. Methods for cost estimation in software project management

    Science.gov (United States)

    Briciu, C. V.; Filip, I.; Indries, I. I.

    2016-02-01

    The speed in which the processes used in software development field have changed makes it very difficult the task of forecasting the overall costs for a software project. By many researchers, this task has been considered unachievable, but there is a group of scientist for which this task can be solved using the already known mathematical methods (e.g. multiple linear regressions) and the new techniques as genetic programming and neural networks. The paper presents a solution for building a model for the cost estimation models in the software project management using genetic algorithms starting from the PROMISE datasets related COCOMO 81 model. In the first part of the paper, a summary of the major achievements in the research area of finding a model for estimating the overall project costs is presented together with the description of the existing software development process models. In the last part, a basic proposal of a mathematical model of a genetic programming is proposed including here the description of the chosen fitness function and chromosome representation. The perspective of model described it linked with the current reality of the software development considering as basis the software product life cycle and the current challenges and innovations in the software development area. Based on the author's experiences and the analysis of the existing models and product lifecycle it was concluded that estimation models should be adapted with the new technologies and emerging systems and they depend largely by the chosen software development method.

  19. Magnitude of Construction Cost and Schedule Overruns in Public Work Projects

    Directory of Open Access Journals (Sweden)

    Pramen P. Shrestha

    2013-01-01

    Full Text Available This study analyzed 363 Clark County Department of Public Works (CCDPW projects to determine construction cost and schedule overruns in various types and sizes of the projects. The sample projects were constructed from 1991 to 2008, with a total construction cost of $1.85 billion, equivalent to 2012 cost. A one-factor ANOVA test was conducted to determine whether construction cost and schedule overruns significantly varied based on types and sizes of the projects. The study showed that large, long-duration projects had significantly higher cost and schedule overruns than smaller, short-duration projects.

  20. Lead Coolant Test Facility Systems Design, Thermal Hydraulic Analysis and Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Soli Khericha; Edwin Harvego; John Svoboda; Ryan Dalling

    2012-01-01

    The Idaho National Laboratory prepared a preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic coolant. Based on review of current world lead or lead-bismuth test facilities and research needs listed in the Generation IV Roadmap, five broad areas of requirements were identified as listed: (1) Develop and Demonstrate Feasibility of Submerged Heat Exchanger; (2) Develop and Demonstrate Open-lattice Flow in Electrically Heated Core; (3) Develop and Demonstrate Chemistry Control; (4) Demonstrate Safe Operation; and (5) Provision for Future Testing. This paper discusses the preliminary design of systems, thermal hydraulic analysis, and simplified cost estimate. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 4200 C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M (in 2006 $). It is also estimated that the facility will require two years to be constructed and ready for operation.

  1. Lead coolant test facility systems design, thermal hydraulic analysis and cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    Khericha, Soli, E-mail: slk2@inel.gov [Battelle Energy Alliance, LLC, Idaho National Laboratory, Idaho Falls, ID 83415 (United States); Harvego, Edwin; Svoboda, John; Evans, Robert [Battelle Energy Alliance, LLC, Idaho National Laboratory, Idaho Falls, ID 83415 (United States); Dalling, Ryan [ExxonMobil Gas and Power Marketing, Houston, TX 77069 (United States)

    2012-01-15

    The Idaho National Laboratory prepared a preliminary technical and functional requirements (T and FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic coolant. Based on review of current world lead or lead-bismuth test facilities and research needs listed in the Generation IV Roadmap, five broad areas of requirements were identified as listed below: Bullet Develop and demonstrate feasibility of submerged heat exchanger. Bullet Develop and demonstrate open-lattice flow in electrically heated core. Bullet Develop and demonstrate chemistry control. Bullet Demonstrate safe operation. Bullet Provision for future testing. This paper discusses the preliminary design of systems, thermal hydraulic analysis, and simplified cost estimated. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 4200 Degree-Sign C. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M (in 2006 $). It is also estimated that the facility will require two years to be constructed and ready for operation.

  2. Estimating the cost of blood: past, present, and future directions.

    Science.gov (United States)

    Shander, Aryeh; Hofmann, Axel; Gombotz, Hans; Theusinger, Oliver M; Spahn, Donat R

    2007-06-01

    Understanding the costs associated with blood products requires sophisticated knowledge about transfusion medicine and is attracting the attention of clinical and administrative healthcare sectors worldwide. To improve outcomes, blood usage must be optimized and expenditures controlled so that resources may be channeled toward other diagnostic, therapeutic, and technological initiatives. Estimating blood costs, however, is a complex undertaking, surpassing simple supply versus demand economics. Shrinking donor availability and application of a precautionary principle to minimize transfusion risks are factors that continue to drive the cost of blood products upward. Recognizing that historical accounting attempts to determine blood costs have varied in scope, perspective, and methodology, new approaches have been initiated to identify all potential cost elements related to blood and blood product administration. Activities are also under way to tie these elements together in a comprehensive and practical model that will be applicable to all single-donor blood products without regard to practice type (e.g., academic, private, multi- or single-center clinic). These initiatives, their rationale, importance, and future directions are described.

  3. Estimated costs of treatment of benign prostate hyperplasia in Brazil

    Directory of Open Access Journals (Sweden)

    Haylton J. Suaid

    2003-06-01

    Full Text Available INTRODUCTION: The treatment of benign prostate hyperplasia (BPH presents 2 options: medical or surgical, and there are doubts about what is the best treatment since 80% of patients who undergo surgery become asymptomatic and 10 to 40% of those under medical regimen undergo surgery within a 5 years period. It is difficult to assess the actual costs of treating BPH in Brazil due to several factors, among them regional particularities and the scarcity of current statistical data. PATIENTS AND METHODS: Recently, in the Ribeirão Preto area, São Paulo, Brazil, the IPSS (International Prostatic Symptoms Score and quality of life were verified in 934 volunteers. It was determined the percentage of individuals with ages ranging from 40 to 79 years with moderate symptoms (score 8-19 and with severe symptoms (score 20-35, values for which are indicated medical and surgical treatment, respectively, according to the Brazilian Society of Urology consensus on BPH. Data on Brazilian population in that age range were obtained from the Brazilian Institute of Geography and Statistics referent to the year of 2000. It was determined the number of patients, according to the criteria above, subjected to either one of the treatments mentioned. Surgical costs of prostate transurethral resection were researched according to Unified Health System - SUS tables (US$ 173 and of Brazilian Medical Society - AMB with a mean cost in 3 hospitals of US$ 933. Drug costs were calculated by the annual mean price (US$ 355 of 4 alpha-blockers (tamsulosin, alfuzosin, doxazosin and terazosin. RESULTS: The estimated population for medical treatment was 5,397,321 individuals, with a cost corresponding to US$ 1,916,489,055.00. The estimated population for surgical treatment was 2,040,299 men, what would represent a cost of US$ 353,291,204.00 based on the SUS table and of US$ 1,904,279,066.00 based on AMB with hospital expenses included. CONCLUSION: All theses facts induce us to predict

  4. Treatment Cost Analysis Tool (TCAT) for estimating costs of outpatient treatment services.

    Science.gov (United States)

    Flynn, Patrick M; Broome, Kirk M; Beaston-Blaakman, Aaron; Knight, Danica K; Horgan, Constance M; Shepard, Donald S

    2009-02-01

    A Microsoft Excel-based workbook designed for research analysts to use in a national study was retooled for treatment program directors and financial officers to allocate, analyze, and estimate outpatient treatment costs in the U.S. This instrument can also be used as a planning and management tool to optimize resources and forecast the impact of future changes in staffing, client flow, program design, and other resources. The Treatment Cost Analysis Tool (TCAT) automatically provides feedback and generates summaries and charts using comparative data from a national sample of non-methadone outpatient providers. TCAT is being used by program staff to capture and allocate both economic and accounting costs, and outpatient service costs are reported for a sample of 70 programs. Costs for an episode of treatment in regular, intensive, and mixed types of outpatient treatment were $882, $1310, and $1381 respectively (based on 20% trimmed means and 2006 dollars). An hour of counseling cost $64 in regular, $85 intensive, and $86 mixed. Group counseling hourly costs per client were $8, $11, and $10 respectively for regular, intensive, and mixed. Future directions include use of a web-based interview version, much like some of the commercially available tax preparation software tools, and extensions for use in other modalities of treatment.

  5. Estimation of cost function in the natural gas industry

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Young Duk [Korea Energy Economics Institute, Euiwang (Korea)

    1999-02-01

    The natural gas industry in Korea has characteristics of a dual industrial structure with wholesale and retail and a regional monopoly of city gas company. Recently there have been discussions on the restructuring of gas industry and the problems arising from such industrial organization. At this point, the labor and capital cost of KOGAS were analyzed to find out efficiency of KOGAS, the wholesaler and the cost function focusing on distribution was estimated to find out effect of scale of city gas company, the retailer. As a result, in the case of KOGAS, it is prove that enhancing competitive power is needed by improving labor productivity through stabilization of labor structure and by maximizing value-added through stability of capital combination. From the estimation of cost function of city gas companies, the existing regional monopoly of city gas company have effects on its scale only when the area of operation and end users used the same amount per end user are increased. (author). 31 refs., 10 figs., 43 tabs.

  6. The contributions of construction material waste to project cost ...

    African Journals Online (AJOL)

    Management, Faculty ... management of materials and waste leads to an increase in the total cost of building ... cost, quality and sustainability, as well as on the success of projects. (Nagapan ..... Moving beyond optimism bias and strategic ...

  7. 7 CFR Exhibit A to Subpart A of... - Estimated Breakdown of Dwelling Costs for Estimating Partial Payments

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Estimated Breakdown of Dwelling Costs for Estimating Partial Payments A Exhibit A to Subpart A of Part 1924 Agriculture Regulations of the Department of... A of Part 1924—Estimated Breakdown of Dwelling Costs for Estimating Partial Payments With slab...

  8. Fast Conceptual Cost Estimating of Aerospace Projects Using Historical Information

    Science.gov (United States)

    Butts, Glenn

    2007-01-01

    Accurate estimates can be created in less than a minute by applying powerful techniques and algorithms to create an Excel-based parametric cost model. In five easy steps you will learn how to normalize your company 's historical cost data to the new project parameters. This paper provides a complete, easy-to-understand, step by step how-to guide. Such a guide does not seem to currently exist. Over 2,000 hours of research, data collection, and trial and error, and thousands of lines of Excel Visual Basic Application (VBA) code were invested in developing these methods. While VBA is not required to use this information, it increases the power and aesthetics of the model. Implementing all of the steps described, while not required, will increase the accuracy of the results.

  9. User costs as one of main advantages of precast concrete application in highway construction

    Science.gov (United States)

    Tomek, Radan

    2017-09-01

    Road user cost primarily refer to the monetized components of road (re)construction impacts, such as the user delay costs, vehicle operating costs, crash costs and emission costs. Objective of this paper is to analyze and appraise the advantages and benefits of the innovative prefabrication approach in contrast to traditional cast-in-place construction method. The goal is to reduce these additional costs borne by motorists and the community at-large as a result of road construction activity to their minimum through application of the prefabrication. Assessing two basic possible approaches to highway infrastructure construction - casting the road pavements and structures either in place or precast off the site - it can be concluded that the initial capital investment costs do not vary much. Substantial differences can be recognized when comparing their life-cycle costs and an extent to which their construction process affects the public, environment and the local economy. Prefabrication of any structure component off-site offers major construction time and user cost savings in comparison with the traditional cast-in-place methods of construction. Precast prestressed road pavements’ technology and precasting bridges’ parts and elements offers dramatic increase in durability, while it also substantially decreases construction time and resulting user costs.

  10. Improved Recharge Estimation from Portable, Low-Cost Weather Stations.

    Science.gov (United States)

    Holländer, Hartmut M; Wang, Zijian; Assefa, Kibreab A; Woodbury, Allan D

    2016-03-01

    Groundwater recharge estimation is a critical quantity for sustainable groundwater management. The feasibility and robustness of recharge estimation was evaluated using physical-based modeling procedures, and data from a low-cost weather station with remote sensor techniques in Southern Abbotsford, British Columbia, Canada. Recharge was determined using the Richards-based vadose zone hydrological model, HYDRUS-1D. The required meteorological data were recorded with a HOBO(TM) weather station for a short observation period (about 1 year) and an existing weather station (Abbotsford A) for long-term study purpose (27 years). Undisturbed soil cores were taken at two locations in the vicinity of the HOBO(TM) weather station. The derived soil hydraulic parameters were used to characterize the soil in the numerical model. Model performance was evaluated using observed soil moisture and soil temperature data obtained from subsurface remote sensors. A rigorous sensitivity analysis was used to test the robustness of the model. Recharge during the short observation period was estimated at 863 and 816 mm. The mean annual recharge was estimated at 848 and 859 mm/year based on a time series of 27 years. The relative ratio of annual recharge-precipitation varied from 43% to 69%. From a monthly recharge perspective, the majority (80%) of recharge due to precipitation occurred during the hydrologic winter period. The comparison of the recharge estimates with other studies indicates a good agreement. Furthermore, this method is able to predict transient recharge estimates, and can provide a reasonable tool for estimates on nutrient leaching that is often controlled by strong precipitation events and rapid infiltration of water and nitrate into the soil.

  11. 48 CFR 2452.216-70 - Estimated cost, base fee and award fee.

    Science.gov (United States)

    2010-10-01

    ... Provisions and Clauses 2452.216-70 Estimated cost, base fee and award fee. As prescribed in 2416.406(e)(1), insert the following clause in all cost-plus-award-fee contracts: Estimated Cost, Base Fee and Award Fee... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost, base fee...

  12. 48 CFR 1852.216-84 - Estimated cost and incentive fee.

    Science.gov (United States)

    2010-10-01

    ... 48 Federal Acquisition Regulations System 6 2010-10-01 2010-10-01 true Estimated cost and... Provisions and Clauses 1852.216-84 Estimated cost and incentive fee. As prescribed in 1816.406-70(d), insert the following clause: Estimated Cost and Incentive Fee (OCT 1996) The target cost of this contract...

  13. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    OpenAIRE

    Ming Li; Guangdong Wu

    2014-01-01

    Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illus...

  14. Why Don't They Just Give Us Money? Project Cost Estimating and Cost Reporting

    Science.gov (United States)

    Comstock, Douglas A.; Van Wychen, Kristin; Zimmerman, Mary Beth

    2015-01-01

    Successful projects require an integrated approach to managing cost, schedule, and risk. This is especially true for complex, multi-year projects involving multiple organizations. To explore solutions and leverage valuable lessons learned, NASA's Virtual Project Management Challenge will kick off a three-part series examining some of the challenges faced by project and program managers when it comes to managing these important elements. In this first session of the series, we will look at cost management, with an emphasis on the critical roles of cost estimating and cost reporting. By taking a proactive approach to both of these activities, project managers can better control life cycle costs, maintain stakeholder confidence, and protect other current and future projects in the organization's portfolio. Speakers will be Doug Comstock, Director of NASA's Cost Analysis Division, Kristin Van Wychen, Senior Analyst in the GAO Acquisition and Sourcing Management Team, and Mary Beth Zimmerman, Branch Chief for NASA's Portfolio Analysis Branch, Strategic Investments Division. Moderator Ramien Pierre is from NASA's Academy for Program/Project and Engineering Leadership (APPEL).

  15. The Software Costs Estimation Based on UML Model

    Institute of Scientific and Technical Information of China (English)

    XiaopingYang; LuJun; YuefengZhao

    2004-01-01

    UML is a standard modeling language used in object-oriented analysis and design. Function point analysis is a method used to measure the size of an application, It is independent of the implementation programming language. Its measuring result can be compared between different development processes. This paper presents a method to use the requirements analysis model of UML to analysis the application's function points, so software developer can use it to estimate the project's size and cost. An improved method is given at the end of this paper.

  16. An evolutionary morphological approach for software development cost estimation.

    Science.gov (United States)

    Araújo, Ricardo de A; Oliveira, Adriano L I; Soares, Sergio; Meira, Silvio

    2012-08-01

    In this work we present an evolutionary morphological approach to solve the software development cost estimation (SDCE) problem. The proposed approach consists of a hybrid artificial neuron based on framework of mathematical morphology (MM) with algebraic foundations in the complete lattice theory (CLT), referred to as dilation-erosion perceptron (DEP). Also, we present an evolutionary learning process, called DEP(MGA), using a modified genetic algorithm (MGA) to design the DEP model, because a drawback arises from the gradient estimation of morphological operators in the classical learning process of the DEP, since they are not differentiable in the usual way. Furthermore, an experimental analysis is conducted with the proposed model using five complex SDCE problems and three well-known performance metrics, demonstrating good performance of the DEP model to solve SDCE problems.

  17. Advanced fuel cycle cost estimation model and its cost estimation results for three nuclear fuel cycles using a dynamic model in Korea

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sungki, E-mail: sgkim1@kaeri.re.kr [Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353 (Korea, Republic of); Ko, Wonil [Korea Atomic Energy Research Institute, 1045 Daedeokdaero, Yuseong-gu, Daejeon 305-353 (Korea, Republic of); Youn, Saerom; Gao, Ruxing [University of Science and Technology, 217 Gajungro, Yuseong-gu, Daejeon 305-350 (Korea, Republic of); Bang, Sungsig, E-mail: ssbang@kaist.ac.kr [Korea Advanced Institute of Science and Technology, Department of Business and Technology Management, 291 Deahak-ro, Yuseong-gu, Daejeon 305-701 (Korea, Republic of)

    2015-11-15

    Highlights: • The nuclear fuel cycle cost using a new cost estimation model was analyzed. • The material flows of three nuclear fuel cycle options were calculated. • The generation cost of once-through was estimated to be 66.88 mills/kW h. • The generation cost of pyro-SFR recycling was estimated to be 78.06 mills/kW h. • The reactor cost was identified as the main cost driver of pyro-SFR recycling. - Abstract: The present study analyzes advanced nuclear fuel cycle cost estimation models such as the different discount rate model and its cost estimation results. To do so, an analysis of the nuclear fuel cycle cost of three options (direct disposal (once through), PWR–MOX (Mixed OXide fuel), and Pyro-SFR (Sodium-cooled Fast Reactor)) from the viewpoint of economic sense, focusing on the cost estimation model, was conducted using a dynamic model. From an analysis of the fuel cycle cost estimation results, it was found that some cost gap exists between the traditional same discount rate model and the advanced different discount rate model. However, this gap does not change the priority of the nuclear fuel cycle option from the viewpoint of economics. In addition, the fuel cycle costs of OT (Once-Through) and Pyro-SFR recycling based on the most likely value using a probabilistic cost estimation except for reactor costs were calculated to be 8.75 mills/kW h and 8.30 mills/kW h, respectively. Namely, the Pyro-SFR recycling option was more economical than the direct disposal option. However, if the reactor cost is considered, the economic sense in the generation cost between the two options (direct disposal vs. Pyro-SFR recycling) can be changed because of the high reactor cost of an SFR.

  18. Manufacture of ammonium sulfate fertilizer from gypsum-rich byproduct of flue gas desulfurization - A prefeasibility cost estimate

    Science.gov (United States)

    Chou, I.-Ming; Rostam-Abadi, M.; Lytle, J.M.; Achorn, F.P.

    1996-01-01

    Costs for constructing and operating a conceptual plant based on a proposed process that converts flue gas desulfurization (FGD)-gypsum to ammonium sulfate fertilizer has been calculated and used to estimate a market price for the product. The average market price of granular ammonium sulfate ($138/ton) exceeds the rough estimated cost of ammonium sulfate from the proposed process ($111/ ton), by 25 percent, if granular size ammonium sulfate crystals of 1.2 to 3.3 millimeters in diameters can be produced by the proposed process. However, there was at least ??30% margin in the cost estimate calculations. The additional costs for compaction, if needed to create granules of the required size, would make the process uneconomical unless considerable efficiency gains are achieved to balance the additional costs. This study suggests the need both to refine the crystallization process and to find potential markets for the calcium carbonate produced by the process.

  19. An innovative time-cost-quality tradeoff modeling of building construction project based on resource allocation.

    Science.gov (United States)

    Hu, Wenfa; He, Xinhua

    2014-01-01

    The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.

  20. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation

    Directory of Open Access Journals (Sweden)

    Wenfa Hu

    2014-01-01

    Full Text Available The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.

  1. Research on cost control and management in high voltage transmission line construction

    Science.gov (United States)

    Xu, Xiaobin

    2017-05-01

    Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.

  2. Resampling Procedure to Construct Estimation Error Efficient Portfolios for Stationary Returns of Assets

    National Research Council Canada - National Science Library

    Shiraishi, Hiroshi

    2010-01-01

    .... Based on this we construct an estimator of the lower tail of the estimation error. Moreover, we introduce the Estimation Error Efficient Portfolio which considers the estimation error as the portfolio risk...

  3. Cost estimations for deep disposal of spent nuclear fuels; Kostnadsberaekning av djupfoervaring av det anvanda kaernbraenslet

    Energy Technology Data Exchange (ETDEWEB)

    Palmqvist, K.; Wallroth, T. [BERGAB - Berggeologiska Undersoekningar AB, Goeteborg (Sweden); Green, L.; Joensson, Lars [Peab Berg AB, Goeteborg (Sweden)

    1999-10-01

    According to the Act on the Financing of Future Expenses for Spent Nuclear Fuel etc. (Financing Act), the Swedish Nuclear Fuel and Waste Management Co. (SKB) must submit, every year, to the Swedish Nuclear Power Inspectorate (SKI), a cost estimate for the management of spent nuclear fuel and for the decommissioning and dismantling of the nuclear power plants. After SKI has examined and evaluated the cost estimates, SKI must submit a proposal to the Government concerning the fee which should be paid by the nuclear power companies per kWh of generated electricity. According to the Financing Act, the reactor owners must pledge collateral in the event that the accumulated fees should be found to be insufficient as a result of early closure of reactors or as a result of underestimating the future expenses of managing the spent nuclear fuel and of decommissioning and dismantling the reactors. The future total expenses resulting from the Financing Act are estimated at about SEK 48 billion at the January 1998 price level. Of this amount, the cost of the final disposal of spent nuclear fuel in SKB's programme is expected to amount to about SEK 12 billion. SKB's estimate comprises the cost of siting, construction and operation of a deep repository for spent nuclear fuel, based on the KBS-3 concept, and a rock cavern for other long-lived waste which SKB plans to locate next to the spent fuel repository. The cost estimate also includes the dismantling and closure of the facility once all of the fuel and the long-lived waste are deposited. The calculations are based on all of the fuel, which will be generated through the operation of the 12 Swedish reactors during a period of 25 years and for every additional year of operation. At the beginning of 1998, SKI commissioned BERGAB to evaluate the cost estimate for the deep disposal of the spent nuclear fuel. The task was divided into two stages, namely a study which was submitted in June 1998 concerning the technical

  4. A General Model for Cost Estimation in an Exchange

    Directory of Open Access Journals (Sweden)

    Benzion Barlev

    2014-03-01

    Full Text Available Current Generally Accepted Accounting Principles (GAAP state that the cost of an asset acquired for cash is the fair value (FV of the amount surrendered, and that of an asset acquired in a non-monetary exchange is the FV of the asset surrendered or, if it is more “clearly evident,” the FV of the acquired asset. The measurement method prescribed for a non-monetary exchange ignores valuable information about the “less clearly evident” asset. Thus, we suggest that the FV in any exchange be measured by the weighted average of the exchanged assets’ FV estimations, where the weights are the inverse of the variances’ estimations. This alternative valuation process accounts for the uncertainty involved in estimating the FV of each of the asset in the exchange. The proposed method suits all types of exchanges: monetary and non-monetary. In a monetary transaction, the weighted average equals the cash paid because the variance of its FV is nil.

  5. COST ANALYSIS IN CONSTRUCTION OF UNDERGROUND MINING STRUCTURES AND OPPORTUNITIES FOR THEIR REDUCTION

    Directory of Open Access Journals (Sweden)

    Nikolinka Doneva

    2015-12-01

    Full Text Available The construction of underground mining facilities is of essential importance to the exploitation of mineral resources. Confirmation of this is the fact that the construction costs of main facilities occupy 40-60% of the underlying investments in the main construction and equipping. The main underground mining facilities are: shafts, drifts, raise, pump chambers, warehouses etc. This paper presents detailed analysis of underground mining facility - drift construction costs per individual working operations, following their change which depends on the rock type and profile size of underground mining facility, as well as possibilities of reducing these costs.

  6. Estimation of Hospital Costs for Colorectal Cancer Care for Nova Scotia

    Directory of Open Access Journals (Sweden)

    Brian D O'Brien

    2001-01-01

    Full Text Available BACKGROUND: Colorectal cancer (CRC is the second most common invasive cancer in Canada. Estimates of the costs of care allow estimation of the cost effectiveness of screening for premalignant and early disease.

  7. 探讨建设工程造价控制%On Construction Project Cost Control

    Institute of Scientific and Technical Information of China (English)

    刘志

    2014-01-01

    建设工程中的造价控制在控制建设工程投资上有重要的意义。笔者结合建设工程造价的特点,针对我国建设工程造价的现状进行了分析,提出了建设工程造价控制的有效措施,以充分发挥建设工程的经济效益。%Construction project cost control is very important for the control of construction project investment. Combined with the characteristics of the construction project cost, this article analyzes the current situation of construction project cost in China, and puts forward the effective measures of the construction project cost control, in order to give full play to the economic benefits of construction project.

  8. Lead Coolant Test Facility Technical and Functional Requirements, Conceptual Design, Cost and Construction Schedule

    Energy Technology Data Exchange (ETDEWEB)

    Soli T. Khericha

    2006-09-01

    This report presents preliminary technical and functional requirements (T&FR), thermal hydraulic design and cost estimate for a lead coolant test facility. The purpose of this small scale facility is to simulate lead coolant fast reactor (LFR) coolant flow in an open lattice geometry core using seven electrical rods and liquid lead or lead-bismuth eutectic. Based on review of current world lead or lead-bismuth test facilities and research need listed in the Generation IV Roadmap, five broad areas of requirements of basis are identified: Develop and Demonstrate Prototype Lead/Lead-Bismuth Liquid Metal Flow Loop Develop and Demonstrate Feasibility of Submerged Heat Exchanger Develop and Demonstrate Open-lattice Flow in Electrically Heated Core Develop and Demonstrate Chemistry Control Demonstrate Safe Operation and Provision for Future Testing. These five broad areas are divided into twenty-one (21) specific requirements ranging from coolant temperature to design lifetime. An overview of project engineering requirements, design requirements, QA and environmental requirements are also presented. The purpose of this T&FRs is to focus the lead fast reactor community domestically on the requirements for the next unique state of the art test facility. The facility thermal hydraulic design is based on the maximum simulated core power using seven electrical heater rods of 420 kW; average linear heat generation rate of 300 W/cm. The core inlet temperature for liquid lead or Pb/Bi eutectic is 420oC. The design includes approximately seventy-five data measurements such as pressure, temperature, and flow rates. The preliminary estimated cost of construction of the facility is $3.7M. It is also estimated that the facility will require two years to be constructed and ready for operation.

  9. A Pragmatic Approach to Product Costing Based on Standard Time Estimation

    Institute of Scientific and Technical Information of China (English)

    JIAO Yuan-yuan; HAN Wen-xiu; DU Jun

    2001-01-01

    The major drawbacks of traditional approaches to product costing include lack of manufacturing knowledge, reliance on the detailed design description, poor cost function approximation and inability to update estimation algorithms by using actual cost data. Adopting the Activity-Based Costing (ABC) concept and based on estimated processing time, this paper proposes a pragmatic approach to product costing. The approach involves two stages, namely the preparatory stage and the estimation stage. A case study conducted in a refrigerator company is reported.

  10. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation

    OpenAIRE

    Wenfa Hu; Xinhua He

    2014-01-01

    The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction l...

  11. Cost estimation of HVDC transmission system of Bangka's NPP candidates

    Science.gov (United States)

    Liun, Edwaren; Suparman

    2014-09-01

    Regarding nuclear power plant development in Bangka Island, it can be estimated that produced power will be oversupply for the Bangka Island and needs to transmit to Sumatra or Java Island. The distance between the regions or islands causing considerable loss of power in transmission by alternating current, and a wide range of technical and economical issues. The objective of this paper addresses to economics analysis of direct current transmission system to overcome those technical problem. Direct current transmission has a stable characteristic, so that the power delivery from Bangka to Sumatra or Java in a large scale efficiently and reliably can be done. HVDC system costs depend on the power capacity applied to the system and length of the transmission line in addition to other variables that may be different.

  12. FASTSim: A Model to Estimate Vehicle Efficiency, Cost and Performance

    Energy Technology Data Exchange (ETDEWEB)

    Brooker, A.; Gonder, J.; Wang, L.; Wood, E.; Lopp, S.; Ramroth, L.

    2015-05-04

    The Future Automotive Systems Technology Simulator (FASTSim) is a high-level advanced vehicle powertrain systems analysis tool supported by the U.S. Department of Energy’s Vehicle Technologies Office. FASTSim provides a quick and simple approach to compare powertrains and estimate the impact of technology improvements on light- and heavy-duty vehicle efficiency, performance, cost, and battery batches of real-world drive cycles. FASTSim’s calculation framework and balance among detail, accuracy, and speed enable it to simulate thousands of driven miles in minutes. The key components and vehicle outputs have been validated by comparing the model outputs to test data for many different vehicles to provide confidence in the results. A graphical user interface makes FASTSim easy and efficient to use. FASTSim is freely available for download from the National Renewable Energy Laboratory’s website (see www.nrel.gov/fastsim).

  13. Advanced Composite Cost Estimating Manual. Volume II. Appendix

    Science.gov (United States)

    1976-08-01

    0~~~~~~; - -m- O1 .,a 0 j in N j "s w f 0 0 Av .s 00 4 164 "i’ 3. -%’ 1*4*J. - N w 0-uo 16 fo moNi o w w -Q * * 0 h" v 0 a rq)E 4.1 w 0 -0 S p4 4 4...REkMOVE CHAIS 0.00J32 06COC43 I I 34 OPIN LC-OR 0*01402 o.ci’r2 I 31 PELEA *. 1.L. L JAO4 000035 22 36 RILtLA5E VAC. LINES 0.0031 !I kfMOVF lPAIk Ptk OVL...0 - NO 1- YES Ia YES INSERTS: 0 - NO 1 - YES 59 a *1 ACCEM-S COST PROJECTION CAM I UNIT MNER~aJboo~ AVE , LOT SIZiTYPE OF ESTIMATE UNIT COST aL. 21

  14. Global cost estimates of reducing carbon emissions through avoided deforestation

    Energy Technology Data Exchange (ETDEWEB)

    Andrasko, K. [U.S. Environmental Protection Agency, Washington, DC (United States); Beach, R. [RTI International, Research Triangle Park, NC (United States); Kindermann, G. [International Institute of Applied Systems Analysis, Laxenburg (Austria); Obersteiner, M. [International Institute of Applied Systems Analysis, Laxenburg (Austria); Rametsteiner, E. [International Institute of Applied Systems Analysis, Laxenburg (Austria); Sathaye, J. [Lawrence Berkeley National Laboratory, Berkeley, CA (United States); Schlamadinger, B. [TerraCarbon, Graz, (Austria); Sohngen, B. [Department of Agricultural, Environmental, and Development Economics, Ohio State University, Columbus, OH (United States); Wunder, S. [Center for International Forestry Research, Belem-PA (Brazil)

    2008-07-15

    Tropical deforestation is estimated to cause about one-quarter of anthropogenic carbon emissions, loss of biodiversity, and other environmental services. United Nations Framework Convention for Climate Change talks are now considering mechanisms for avoiding deforestation (AD), but the economic potential of AD has yet to be addressed. We use three economic models of glboal land use and management to analyze the potential contribution of AD activities to reduced greenhouse gas emissions. AD activities are found to be a competitive, low-cost abatement option. A program providing a 10% reduction in deforestation from 2005 to 2030 could provide 0.3-0.6 Gt (1 Gt = 1 x 105 g) CO2{center_dot}yr-1 in emission reductions and would require $0.4 billion to $1.7 billion{center_dot}yr-1 for 30 years. A 50% reduction in deforestation from 2005 to 2030 could provide 1.5-2.7 Gt CO2{center_dot}yr-1 in emission reductions and would require $17.2 billion to $28.0 billion{center_dot}yr-1. Finally, some caveats to the analysis that could increase costs of AD programs are described.

  15. Comparative cost estimates of five coal utilization processes

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    Detailed capital and operating cost estimates were prepared for the generation of electric power in a new, net 500 MW (e), coal-burning facility by five alternative processes: conventional boiler with no control of SO/sub 2/ emissions, atmospheric fluidized bed steam generator (AFB), conventional boiler equipped with a limestone FGD system, conventional boiler equipped with magnesia FGD system, and coal beneficiation followed by a conventional boiler quipped with limestone FGD for part of the flue gas stream. For a coal containing 3.5% sulfur, meeting SO/sub 2/ emission limits of 1.2 pounds per million Btu fired was most economical with the limestone FGD system. This result was unchanged for a coal containing 5% sulfur; however, for 2% sulfur, limestone FGD and AFB were competitive methods of controlling SO/sub 2/ emissions. Brief consideration of 90% reduction of SO/sub 2/ emissions led to the choice of limestone FGD as the most economical method. Byproduct credit for the sulfuric acid produced in regenerating the magnesia could make that system competitive with the limestone FGD system, depending upon local markets. The cost of sludge fixation and disposal would make limestone FGD noneconomic in many situations, if these steps are necessary.

  16. Taking the Evolutionary Road to Developing an In-House Cost Estimate

    Science.gov (United States)

    Jacintho, David; Esker, Lind; Herman, Frank; Lavaque, Rodolfo; Regardie, Myma

    2011-01-01

    This slide presentation reviews the process and some of the problems and challenges of developing an In-House Cost Estimate (IHCE). Using as an example the Space Network Ground Segment Sustainment (SGSS) project, the presentation reviews the phases for developing a Cost estimate within the project to estimate government and contractor project costs to support a budget request.

  17. 40 CFR 144.62 - Cost estimate for plugging and abandonment.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 22 2010-07-01 2010-07-01 false Cost estimate for plugging and... Waste Injection Wells § 144.62 Cost estimate for plugging and abandonment. (a) The owner or operator must prepare a written estimate, in current dollars, of the cost of plugging the injection well...

  18. Evaluation of the Cost Estimation Models: Case Study of Task Manager Application

    Directory of Open Access Journals (Sweden)

    Mohammed Mugahed Al Qmase

    2013-10-01

    Full Text Available The need to accurately estimate time and cost for effective planning of software projects is becoming crucial driven by the escalating demands of the software market. Several models proposed in the history of Software Engineering discipline to estimate time, costs associated with planning and managing software projects as Line of Code (LOC, Function Point (FP and Constructive Cost Model (COCOMO. This paper focuses upon the COCOMO Model. It is further consisted of its two sub models called COCOMO I and COCOMO II. The primary objective of this research is to use an appropriate case study to evaluate the accuracy of the sub models COCOMO I and II and ascertain the variation of the realistic resource effort, staff and time. The findings to date show that the Application Composition Model of COCOMO II is more accurate in determining time and cost for the successful conclusion of a software project than the other two COCOMO I and II Models for a similar application for example Task Manager.

  19. Innovation in the pharmaceutical industry: New estimates of R&D costs.

    Science.gov (United States)

    DiMasi, Joseph A; Grabowski, Henry G; Hansen, Ronald W

    2016-05-01

    The research and development costs of 106 randomly selected new drugs were obtained from a survey of 10 pharmaceutical firms. These data were used to estimate the average pre-tax cost of new drug and biologics development. The costs of compounds abandoned during testing were linked to the costs of compounds that obtained marketing approval. The estimated average out-of-pocket cost per approved new compound is $1395 million (2013 dollars). Capitalizing out-of-pocket costs to the point of marketing approval at a real discount rate of 10.5% yields a total pre-approval cost estimate of $2558 million (2013 dollars). When compared to the results of the previous study in this series, total capitalized costs were shown to have increased at an annual rate of 8.5% above general price inflation. Adding an estimate of post-approval R&D costs increases the cost estimate to $2870 million (2013 dollars).

  20. IDC reengineering Phase 2 & 3 US industry standard cost estimate summary

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States); Huelskamp, Robert M. [Sandia National Lab. (SNL-NM), Albuquerque, NM (United States)

    2015-01-01

    Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, using a commercial software cost estimation tool calibrated to US industry performance parameters. This is not a cost estimate for Sandia to perform the project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

  1. Cost estimation: An expert-opinion approach. [cost analysis of research projects using the Delphi method (forecasting)

    Science.gov (United States)

    Buffalano, C.; Fogleman, S.; Gielecki, M.

    1976-01-01

    A methodology is outlined which can be used to estimate the costs of research and development projects. The approach uses the Delphi technique a method developed by the Rand Corporation for systematically eliciting and evaluating group judgments in an objective manner. The use of the Delphi allows for the integration of expert opinion into the cost-estimating process in a consistent and rigorous fashion. This approach can also signal potential cost-problem areas. This result can be a useful tool in planning additional cost analysis or in estimating contingency funds. A Monte Carlo approach is also examined.

  2. Using a Cost-Construction Model To Assess the Cost of Educating Undergraduate Medical Students at the University of Texas-Houston Medical School.

    Science.gov (United States)

    Franzini, Luisa; And Others

    1997-01-01

    Using a cost-construction model, cost of the University of Texas-Houston Medical School program, instructional costs, educational costs, and milieu costs were calculated. Sensitivity analysis revealed the financial effects of various factors, some of which increased and some of which decreased cost. Despite inherent complexities of the method and…

  3. Comparison construction costs conventional rubblemound breakwaters/bermbreakwater

    NARCIS (Netherlands)

    Hauer, M.; Op den Velde, W.; Vrijling, J.K.; D' Angremond, K.

    1995-01-01

    Given a harbour location and a wave-climate, two different types of rubble-mound breakwaters were designed. Using realistic quarry yield curves and prices for production, transport and constmction, the total costs of the conventional statically stable and dynamically stable bermbreakwater designs we

  4. On the Construction Cost Risk Management%浅谈建设工程造价风险管理

    Institute of Scientific and Technical Information of China (English)

    陈晔

    2011-01-01

    The article discusses and analyzes the issues about settlement over budget estimates in current construction cost and puts forward the carresponding control measures for reference.%本文对当前建设工程造价中普遍存在结算超概算问题进行探讨分析,并就相关问题给出了相应的控制措施,仅供参考.

  5. Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects

    Directory of Open Access Journals (Sweden)

    Ming Li

    2014-01-01

    Full Text Available Construction projects are generally subject to uncertainty, which influences the realization of time-cost tradeoff in project management. This paper addresses a time-cost tradeoff problem under uncertainty, in which activities in projects can be executed in different construction modes corresponding to specified time and cost with interval uncertainty. Based on multiobjective robust optimization method, a robust optimization model for time-cost tradeoff problem is developed. In order to illustrate the robust model, nondominated sorting genetic algorithm-II (NSGA-II is modified to solve the project example. The results show that, by means of adjusting the time and cost robust coefficients, the robust Pareto sets for time-cost tradeoff can be obtained according to different acceptable risk level, from which the decision maker could choose the preferred construction alternative.

  6. Developing a Cost Model and Methodology to Estimate Capital Costs for Thermal Energy Storage

    Energy Technology Data Exchange (ETDEWEB)

    Glatzmaier, G.

    2011-12-01

    This report provides an update on the previous cost model for thermal energy storage (TES) systems. The update allows NREL to estimate the costs of such systems that are compatible with the higher operating temperatures associated with advanced power cycles. The goal of the Department of Energy (DOE) Solar Energy Technology Program is to develop solar technologies that can make a significant contribution to the United States domestic energy supply. The recent DOE SunShot Initiative sets a very aggressive cost goal to reach a Levelized Cost of Energy (LCOE) of 6 cents/kWh by 2020 with no incentives or credits for all solar-to-electricity technologies.1 As this goal is reached, the share of utility power generation that is provided by renewable energy sources is expected to increase dramatically. Because Concentrating Solar Power (CSP) is currently the only renewable technology that is capable of integrating cost-effective energy storage, it is positioned to play a key role in providing renewable, dispatchable power to utilities as the share of power generation from renewable sources increases. Because of this role, future CSP plants will likely have as much as 15 hours of Thermal Energy Storage (TES) included in their design and operation. As such, the cost and performance of the TES system is critical to meeting the SunShot goal for solar technologies. The cost of electricity from a CSP plant depends strongly on its overall efficiency, which is a product of two components - the collection and conversion efficiencies. The collection efficiency determines the portion of incident solar energy that is captured as high-temperature thermal energy. The conversion efficiency determines the portion of thermal energy that is converted to electricity. The operating temperature at which the overall efficiency reaches its maximum depends on many factors, including material properties of the CSP plant components. Increasing the operating temperature of the power generation

  7. Energetic costs of mange in wolves estimated from infrared thermography

    Science.gov (United States)

    Cross, Paul C.; Almberg, Emily S.; Haase, Catherine G; Hudson, Peter J.; Maloney, Shane K; Metz, Matthew C; Munn, Adam J; Nugent, Paul; Putzeys, Olivier; Stahler, Daniel R.; Stewart, Anya C; Smith, Doug W.

    2016-01-01

    Parasites, by definition, extract energy from their hosts and thus affect trophic and food web dynamics even when the parasite may have limited effects on host population size. We studied the energetic costs of mange (Sarcoptes scabiei) in wolves (Canis lupus) using thermal cameras to estimate heat losses associated with compromised insulation during the winter. We combined the field data of known, naturally infected wolves with data set on captive wolves with shaved patches of fur as a positive control to simulate mange-induced hair loss. We predict that during the winter in Montana, more severe mange infection increases heat loss by around 5.2 to 12 MJ per night (1240 to 2850 kcal, or a 65% to 78% increase) for small and large wolves, respectively accounting for wind effects. To maintain body temperature would require a significant proportion of a healthy wolf's total daily energy demands (18-22 MJ/day). We also predict how these thermal costs may increase in colder climates by comparing our predictions in Bozeman, Montana to those from a place with lower ambient temperatures (Fairbanks, Alaska). Contrary to our expectations, the 14°C differential between these regions was not as important as the potential differences in wind speed. These large increases in energetic demands can be mitigated by either increasing consumption rates or decreasing other energy demands. Data from GPS-collared wolves indicated that healthy wolves move, on average, 17 km per day, which was reduced by 1.5, 1.8 and 6.5 km for light, medium, and severe hair loss. In addition, the wolf with the most hair loss was less active at night and more active during the day, which is the converse of the movement patterns of healthy wolves. At the individual level mange infections create significant energy demands and altered behavioral patterns, this may have cascading effects on prey consumption rates, food web dynamics, predator-prey interactions, and scavenger communities.

  8. Breckinridge Project, initial effort. Report IX. Operating cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    None

    1982-01-01

    Operating costs are normally broken into three major categories: variable costs including raw materials, annual catalyst and chemicals, and utilities; semi-variable costs including labor and labor related cost; and fixed or capital related charges. The raw materials and utilities costs are proportional to production; however, a small component of utilities cost is independent of production. The catalyst and chemicals costs are also normally proportional to production. Semi-variable costs include direct labor, maintenance labor, labor supervision, contract maintenance, maintenance materials, payroll overheads, operation supplies, and general overhead and administration. Fixed costs include local taxes, insurance and the time value of the capital investment. The latter charge often includes the investor's anticipated return on investment. In determining operating costs for financial analysis, return on investment (ROI) and depreciation are not treated as cash operating costs. These costs are developed in the financial analysis; the annual operating cost determined here omits ROI and depreciation. Project Annual Operating Costs are summarized in Table 1. Detailed supporting information for the cost elements listed below is included in the following sections: Electrical, catalyst and chemicals, and salaries and wages.

  9. Designing to target cost: one approach to design/construction integration

    DEFF Research Database (Denmark)

    Jørgensen, Bo

    2005-01-01

    One approach to a more integrated construction delivery process is the concept of ‘designing to target cost’ of which the first examples of application within a lean construction framework have recently been seen. This paper introduces the main principles of the design to target cost method...... and discusses the applicability of this approach to construction. The low degree of organizational and technical continuity from one construction project to the next limits the applicability of the design for target cost approach when compared to its origin in product development of mass manufactured artefacts...

  10. DRUG ADDICTION SOCIAL COST IN RUSSIA REGIONS: METHODICAL APPROACH AND ESTIMATION RESULTS

    Directory of Open Access Journals (Sweden)

    A.V. Kalina

    2007-06-01

    Full Text Available The methodical approach to drug addiction social cost estimation in Russian regions is suggested in the article. It is presented by cost estimation of socio-economical consequences of drug addiction spread on the territory. The main approaches to latency characteristics of drug addiction situation estimation are shown. The results of drug addiction and its separate parts social cost estimation are given for federal regions and subjects of Russian Federation for the period of 2001 − 2005.

  11. Different approaches to estimating transition costs in the electric- utility industry

    Energy Technology Data Exchange (ETDEWEB)

    Baxter, L.W.

    1995-10-01

    The term ``transition costs`` describes the potential revenue shortfall (or welfare loss) a utility (or other actor) may experience through government-initiated deregulation of electricity generation. The potential for transition costs arises whenever a regulated industry is subject to competitive market forces as a result of explicit government action. Federal and state proposals to deregulate electricity generation sparked a national debate on transition costs in the electric-utility industry. Industry-wide transition cost estimates range from about $20 billion to $500 billion. Such disparate estimates raise important questions on estimation methods for decision makers. This report examines different approaches to estimating transition costs. The study has three objectives. First, we discuss the concept of transition cost. Second, we identify the major cost categories included in transition cost estimates and summarize the current debate on which specific costs are appropriately included in these estimates. Finally, we identify general and specific estimation approaches and assess their strengths and weaknesses. We relied primarily on the evidentiary records established at the Federal Energy Regulatory Commission and the California Public Utilities Commission to identify major cost categories and specific estimation approaches. We also contacted regulatory commission staffs in ten states to ascertain estimation activities in each of these states. We refined a classification framework to describe and assess general estimation options. We subsequently developed and applied criteria to describe and assess specific estimation approaches proposed by federal regulators, state regulators, utilities, independent power companies, and consultants.

  12. On information and communication technology and production cost in construction industry: evidence from the Netherlands

    NARCIS (Netherlands)

    van der Vlist, A.J; Vrolijk, M.H.; Dewulf, Geert P.M.R.

    2014-01-01

    The interplay between information and communication technology (ICT) and the competitiveness of construction firms is considered. More specifically, the question is whether firms that invest in information and communication technology have a production cost advantage. The economics literature

  13. Cost Consideration and a Possible Construction Timeline of the CEPC-SPPC

    Energy Technology Data Exchange (ETDEWEB)

    Chou, Weiren [Fermilab

    2015-04-01

    This paper discusses the cost consideration and a possible construction timeline of the CEPC-SPPC study based on a preliminary conceptual design that is being carried out at the Institute of High Energy Physics (IHEP) in China.

  14. 2007 Effect of Changes in Layout Shape on Unit Construction Cost ...

    African Journals Online (AJOL)

    ezra

    and sizes of vertical components such as external walls and associated finishes, ... construction cost) obtained by dividing total project ... since non-right angled internal arrangements are .... corner columns (such as the square shape and.

  15. A LOW-COST THREE-DIMENSIONAL SAMPLE COLLECTION ARRAY TO EVALUATE AND MONITOR CONSTRUCTED WETLANDS

    Science.gov (United States)

    Artificially constructed wetlands are gaining acceptance as a low cost treatment alternative to remove a number of undesirable constituents from water. Wetlands can be used to physically remove compounds such as suspended solids through sedimentation. Dissolved nutrients, biochemical oxygen demand, ...

  16. Evidence that Risk Adjustment is Unnecessary in Estimates of the User Cost of Money

    Directory of Open Access Journals (Sweden)

    Diego A. Restrepo-Tobón

    2015-12-01

    Full Text Available Investors value the  special attributes of monetary assets (e.g.,  exchangeability, liquidity, and safety  and pay a premium for holding them in the form of a lower return rate. The user cost of holding monetary assets can be measured approximately by the difference between the  returns on illiquid risky assets and  those of safer liquid assets. A more appropriate measure should adjust this difference by the  differential risk of the  assets in question. We investigate the  impact that time  non-separable preferences has on the  estimation of the  risk-adjusted user cost of money. Using U.K. data from 1965Q1 to 2011Q1, we estimate a habit-based asset pricing model  with money  in the utility function and  find that the  risk  adjustment for risky monetary assets is negligible. Thus, researchers can dispense with risk adjusting the  user cost of money  in constructing monetary aggregate indexes.

  17. Integrated Library Systems for Small Libraries: Estimating the Cost.

    Science.gov (United States)

    Havercamp, Dan

    1985-01-01

    The "average" costs of integrated library system components--including hardware, software, and related expenses--are outlined to assist in projecting the costs of a small system. Potential benefits of such systems, i.e., areas in which operational costs can be reduced through their use, are also reviewed. (EJS)

  18. Developing a took for project contingency estimation in a large portfolio of construction projects

    Directory of Open Access Journals (Sweden)

    Van Niekerk, Mariette

    2014-11-01

    Full Text Available To enable the management of project-related risk on a portfolio level in an owner organisation, project contingency estimation should be performed consistently and objectively. This article discusses the development of a contingency estimation tool for a large portfolio that contains similar construction projects. The purpose of developing this tool is to decrease the influence of subjectivity on contingency estimation methods throughout the project life cycle, thereby enabling consistent reflection on project risk at the portfolio level. Our research contribution is the delivery of a hybrid tool that incorporates both neural network modelling of systemic risks and expected value analysis of project-specific risks. The neural network is trained using historical project data, supported by data obtained from interviews with project managers. Expected value analysis is achieved in a risk register format employing a binomial distribution to estimate the number of risks expected. By following this approach, the contingency estimation tool can be used without expert knowledge of project risk management. In addition, this approach can provide contingency cost and duration output on a project level, and it contains both systemic and project-specific risks in a single tool.

  19. What Would It Cost to Coach Every New Principal? An Estimate Using Statewide Personnel Data

    Science.gov (United States)

    Lochmiller, Chad R.

    2014-01-01

    In this paper, I use Levin and McEwan's (2001) cost feasibility approach and personnel data obtained from the Superintendent of Public Instruction to estimate the cost of providing coaching support to every newly hired principal in Washington State. Based on this descriptive analysis, I estimate that the cost to provide leadership coaching to…

  20. Energetic costs of mange in wolves estimated from infrared thermography.

    Science.gov (United States)

    Cross, P C; Almberg, E S; Haase, C G; Hudson, P J; Maloney, S K; Metz, M C; Munn, A J; Nugent, P; Putzeys, O; Stahler, D R; Stewart, A C; Smith, D W

    2016-08-01

    Parasites, by definition, extract energy from their hosts and thus affect trophic and food web dynamics even when the parasite may have limited effects on host population size. We studied the energetic costs of mange (Sarcoptes scabiei) in wolves (Canis lupus) using thermal cameras to estimate heat losses associated with compromised insulation during the winter. We combined the field data of known, naturally infected wolves with a data set on captive wolves with shaved patches of fur as a positive control to simulate mange-induced hair loss. We predict that during the winter in Montana, more severe mange infection increases heat loss by around 5.2-12 MJ per night (1,240-2,850 kcal, or a 65-78% increase) for small and large wolves, respectively, accounting for wind effects. To maintain body temperature would require a significant proportion of a healthy wolf's total daily energy demands (18-22 MJ/day). We also predict how these thermal costs may increase in colder climates by comparing our predictions in Bozeman, Montana to those from a place with lower ambient temperatures (Fairbanks, Alaska). Contrary to our expectations, the 14°C differential between these regions was not as important as the potential differences in wind speed. These large increases in energetic demands can be mitigated by either increasing consumption rates or decreasing other energy demands. Data from GPS-collared wolves indicated that healthy wolves move, on average, 17 km per day, which was reduced by 1.5, 1.8, and 6.5 km for light, medium, and severe hair loss. In addition, the wolf with the most hair loss was less active at night and more active during the day, which is the converse of the movement patterns of healthy wolves. At the individual level, mange infections create significant energy demands and altered behavioral patterns, this may have cascading effects on prey consumption rates, food web dynamics, predator-prey interactions, and scavenger communities.

  1. A new approach for product cost estimation using data envelopment analysis

    Directory of Open Access Journals (Sweden)

    Adil Salam

    2012-10-01

    Full Text Available Cost estimation of new products has always been difficult as only few design, manufacturing and operational features will be known. In these situations, parametric or non-parametric methods are commonly used to estimate the cost of a product given the corresponding cost drivers. The parametric models use priori determined cost function where the parameters of the function are evaluated from historical data. Non-parametric methods, on the other hand, attempt to fit curves to the historic data without predetermined function. In both methods, it is assumed that the historic data used in the analysis is a true representation of the relation between the cost drivers and the corresponding costs. However, because of efficiency variations of the manufacturers and suppliers, changes in supplier selections, market fluctuations, and several other reasons, certain costs in the historic data may be too high whereas other costs may represent better deals for their corresponding cost drivers. Thus, it may be important to rank the historic data and identify benchmarks and estimate the target costs of the product based on these benchmarks. In this paper, a novel adaptation of cost drivers and cost data is introduced in order to use data envelopment analysis for the purpose of ranking cost data and identify benchmarks, and then estimate the target costs of a new product based on these benchmarks. An illustrative case study has been presented for the cost estimation of landing gears of an aircraft manufactured by an aerospace company located in Montreal, CANADA.

  2. Green Energy in New Construction: Maximize Energy Savings and Minimize Cost

    Science.gov (United States)

    Ventresca, Joseph

    2010-01-01

    People often use the term "green energy" to refer to alternative energy technologies. But green energy doesn't guarantee maximum energy savings at a minimum cost--a common misconception. For school business officials, green energy means getting the lowest energy bills for the lowest construction cost, which translates into maximizing green energy…

  3. 36 CFR 51.57 - How does a concessioner request arbitration of the construction cost of a capital improvement?

    Science.gov (United States)

    2010-07-01

    ... request arbitration of the construction cost of a capital improvement? 51.57 Section 51.57 Parks, Forests... Surrender Interest § 51.57 How does a concessioner request arbitration of the construction cost of a capital improvement? If a concessioner requests arbitration of the construction cost of a capital...

  4. Estimating study costs for use in VOI, a study of dutch publicly funded drug related research

    NARCIS (Netherlands)

    Van Asselt, A.D.; Ramaekers, B.L.; Corro Ramos, I.; Joore, M.A.; Al, M.J.; Lesman-Leegte, I.; Postma, M.J.; Vemer, P.; Feenstra, T.F.

    2016-01-01

    Objectives: To perform value of information (VOI) analyses, an estimate of research costs is needed. However, reference values for such costs are not available. This study aimed to analyze empirical data on research budgets and, by means of a cost tool, provide an overview of costs of several types

  5. Healthcare costs associated with prostate cancer : estimates from a population-based study

    NARCIS (Netherlands)

    Krahn, Murray D.; Zagorski, Brandon; Laporte, Audrey; Alibhai, Shabbir M. H.; Bremner, Karen E.; Tomlinson, George; Warde, Padraig; Naglie, Gary

    OBJECTIVE To estimate the total healthcare costs and costs attributable to prostate cancer across all stages of disease, and to determine the predictors of those costs, as describing the cost of care for patients with prostate cancer is useful to understand the economic burden of illness, explore

  6. IDC Reengineering Phase 2 & 3 Rough Order of Magnitude (ROM) Cost Estimate Summary (Leveraged NDC Case).

    Energy Technology Data Exchange (ETDEWEB)

    Harris, James M.; Prescott, Ryan; Dawson, Jericah M.; Huelskamp, Robert M.

    2014-11-01

    Sandia National Laboratories has prepared a ROM cost estimate for budgetary planning for the IDC Reengineering Phase 2 & 3 effort, based on leveraging a fully funded, Sandia executed NDC Modernization project. This report provides the ROM cost estimate and describes the methodology, assumptions, and cost model details used to create the ROM cost estimate. ROM Cost Estimate Disclaimer Contained herein is a Rough Order of Magnitude (ROM) cost estimate that has been provided to enable initial planning for this proposed project. This ROM cost estimate is submitted to facilitate informal discussions in relation to this project and is NOT intended to commit Sandia National Laboratories (Sandia) or its resources. Furthermore, as a Federally Funded Research and Development Center (FFRDC), Sandia must be compliant with the Anti-Deficiency Act and operate on a full-cost recovery basis. Therefore, while Sandia, in conjunction with the Sponsor, will use best judgment to execute work and to address the highest risks and most important issues in order to effectively manage within cost constraints, this ROM estimate and any subsequent approved cost estimates are on a 'full-cost recovery' basis. Thus, work can neither commence nor continue unless adequate funding has been accepted and certified by DOE.

  7. Application of the fuzzy sets theory to cost calculations on individual stages of a construction investment

    Science.gov (United States)

    Plebankiewicz, Edyta

    2016-06-01

    One of the most significant parameters of cost calculations of a construction project are the costs. Their calculation on each stage of the investment process is characterized by high uncertainty. This is one of the reasons for using fuzzy logic to such calculations. The paper presents a short description of applications of fuzzy logic to compute costs on various stages of the investment process. They encompass both the initial planning stage and the calculations during the tender procedure.

  8. The Importance of Safety in Construction Sector: Costs of Occupational Accidents in Construction Sites

    OpenAIRE

    Fatih Yılmaz; Uğur Buğra Çelebi

    2015-01-01

    Occupational accidents cause important social and economic problems by loss of life and physical injuries. Construction sector involves high risk due to its production processes and labor intensive characteristic and because of occupational accidents the sector brings up against financial loss in large scale. In developing countries, construction sector is one of the most important sectors that have a great contribution to economic development with its employment capacity and added-value t...

  9. Los Alamos Waste Management Cost Estimation Model; Final report: Documentation of waste management process, development of Cost Estimation Model, and model reference manual

    Energy Technology Data Exchange (ETDEWEB)

    Matysiak, L.M.; Burns, M.L.

    1994-03-01

    This final report completes the Los Alamos Waste Management Cost Estimation Project, and includes the documentation of the waste management processes at Los Alamos National Laboratory (LANL) for hazardous, mixed, low-level radioactive solid and transuranic waste, development of the cost estimation model and a user reference manual. The ultimate goal of this effort was to develop an estimate of the life cycle costs for the aforementioned waste types. The Cost Estimation Model is a tool that can be used to calculate the costs of waste management at LANL for the aforementioned waste types, under several different scenarios. Each waste category at LANL is managed in a separate fashion, according to Department of Energy requirements and state and federal regulations. The cost of the waste management process for each waste category has not previously been well documented. In particular, the costs associated with the handling, treatment and storage of the waste have not been well understood. It is anticipated that greater knowledge of these costs will encourage waste generators at the Laboratory to apply waste minimization techniques to current operations. Expected benefits of waste minimization are a reduction in waste volume, decrease in liability and lower waste management costs.

  10. Lunar base scenario cost estimates: Lunar base systems study task 6.1

    Science.gov (United States)

    1988-01-01

    The projected development and production costs of each of the Lunar Base's systems are described and unit costs are estimated for transporting the systems to the lunar surface and for setting up the system.

  11. Transaction Costs in Constructing Small and Medium Hydro Power Plants in Albania

    Directory of Open Access Journals (Sweden)

    Florian Miti

    2015-06-01

    Full Text Available Identifying the transaction costs helps knowing which are the real costs of starting a new business, finding bottlenecks, can serve to reduce inefficiencies and encourage more effective reforms. In  this article we analyze the impact of transaction costs in interactions between firms and public authority, when firms participate in the bidding procedure for constructing new hydropower plants until the stage of producing electricity. In the first years, after granting the concession right, firms face many difficulties due to a complex normative regulation, contractual conditions and  bureaucracy. Although in the majority of the cases, winning firms are provided by the public authority with the  concessionary permit within the legal deadlines, they fail to start producing electricity within the declared  timetable. Even though direct transaction costs computed by measuring the actual costs that firms or individuals face during these procedures may be relatively low, fairly 1-2 % of the total cost of investment, opportunity costs considering the potential loss in the revenues due to delays in producing and selling electricity, in some cases,  can be equal to the total cost of constructing the implant. Keywords: transaction costs, concessions, hydro power constructing, regulation.

  12. Use and Application of Computers in Construction Estimating.

    Science.gov (United States)

    1985-01-01

    material, labor and equipment needed for the entire project from a set of draw- ings and specifications. For each area of construction work (e.g., formwork ...An example of the construction from ground level down is the roadways and tunnel foundation of the Epcot Center. The company is located in Orlando

  13. A building cost estimation method for inland ships

    NARCIS (Netherlands)

    Hekkenberg, R.G.

    2014-01-01

    There is very little publicly available data about the building cost of inland ships, especially for ships that have dimensions that differ significantly from those of common ships. Also, no methods to determine the building cost of inland ships are described in literature. In this paper, a method t

  14. COST ESTIMATION MODELS FOR DRINKING WATER TREATMENT UNIT PROCESSES

    Science.gov (United States)

    Cost models for unit processes typically utilized in a conventional water treatment plant and in package treatment plant technology are compiled in this paper. The cost curves are represented as a function of specified design parameters and are categorized into four major catego...

  15. 28 CFR 100.16 - Cost estimate submission.

    Science.gov (United States)

    2010-07-01

    ... each cost element, consistent with the carrier's cost accounting system. (4) When more than one line... element. (5) Depending on the carrier's accounting system, the carrier shall provide breakdowns for the... materials, parts, software, components, and assemblies. For all items proposed, identify the item,...

  16. Cost estimation and economical evaluation of three configurations of activated sludge process for a wastewater treatment plant (WWTP) using simulation

    Science.gov (United States)

    Jafarinejad, Shahryar

    2016-07-01

    The activated sludge (AS) process is a type of suspended growth biological wastewater treatment that is used for treating both municipal sewage and a variety of industrial wastewaters. Economical modeling and cost estimation of activated sludge processes are crucial for designing, construction, and forecasting future economical requirements of wastewater treatment plants (WWTPs). In this study, three configurations containing conventional activated sludge (CAS), extended aeration activated sludge (EAAS), and sequencing batch reactor (SBR) processes for a wastewater treatment plant in Tehran city were proposed and the total project construction, operation labor, maintenance, material, chemical, energy and amortization costs of these WWTPs were calculated and compared. Besides, effect of mixed liquor suspended solid (MLSS) amounts on costs of WWTPs was investigated. Results demonstrated that increase of MLSS decreases the total project construction, material and amortization costs of WWTPs containing EAAS and CAS. In addition, increase of this value increases the total operation, maintenance and energy costs, but does not affect chemical cost of WWTPs containing EAAS and CAS.

  17. Cost estimation and economical evaluation of three configurations of activated sludge process for a wastewater treatment plant (WWTP) using simulation

    Science.gov (United States)

    Jafarinejad, Shahryar

    2017-09-01

    The activated sludge (AS) process is a type of suspended growth biological wastewater treatment that is used for treating both municipal sewage and a variety of industrial wastewaters. Economical modeling and cost estimation of activated sludge processes are crucial for designing, construction, and forecasting future economical requirements of wastewater treatment plants (WWTPs). In this study, three configurations containing conventional activated sludge (CAS), extended aeration activated sludge (EAAS), and sequencing batch reactor (SBR) processes for a wastewater treatment plant in Tehran city were proposed and the total project construction, operation labor, maintenance, material, chemical, energy and amortization costs of these WWTPs were calculated and compared. Besides, effect of mixed liquor suspended solid (MLSS) amounts on costs of WWTPs was investigated. Results demonstrated that increase of MLSS decreases the total project construction, material and amortization costs of WWTPs containing EAAS and CAS. In addition, increase of this value increases the total operation, maintenance and energy costs, but does not affect chemical cost of WWTPs containing EAAS and CAS.

  18. Estimating the cost of operating cancer registries: Experience in Colombia.

    Science.gov (United States)

    de Vries, Esther; Pardo, Constanza; Arias, Nelson; Bravo, Luis Eduardo; Navarro, Edgar; Uribe, Claudia; Yepez, María Clara; Jurado, Daniel; Garci, Luz Stella; Piñeros, Marion; Edwards, Patrick; Beebe, Maggie Cole; Tangka, Florence; Subramanian, Sujha

    2016-12-01

    Maintaining population-based registries requires adequate and sustained resources; however, to date there has been no systematic evaluation to identify the resource needs for cancer registration in most countries, including Colombia. A systematic assessment of the costs can quantify the funding required and identify processes to improve efficiency of cancer registries. The Centers for Disease Control and Prevention's (CDC's) International Registry Costing Tool (IntRegCosting Tool) was tailored specifically for the Colombian registries and was used to collect resource use data from five regional population-based cancer registries: Barranquilla, Bucaramanga, Cali, Manizales, and Pasto. The registries provided cost data for the year 2013 and cancer cases corresponding to the year 2010. We identified an almost threefold variation in the average cost per case (77,932 to 214,082 Colombian pesos or US $41 to US $113 in 2013) across the registries, but there were also substantial differences in data collection approaches, types of data collected, and activities performed. Cost per inhabitant varied between 95 and 415 Colombian pesos (US $0.05 to US $0.22). Between 20% and 45% of the total cost was due to fixed cost activities. The detailed economic information presented in this study constitutes a valuable source of activity-based cost data that registries can use to compare operations, assess key factors that lead to differences in cost per case, and identify potential approaches to improve efficiencies. Furthermore, the knowledge gained from studying the Colombian registries can help inform the planning and operations of other registries in the region. Published by Elsevier Ltd.

  19. Stochastic Frontier Estimation of a CES Cost Function: The Case of Higher Education in Britain.

    Science.gov (United States)

    Izadi, Hooshang; Johnes, Geraint; Oskrochi, Reza; Crouchley, Robert

    2002-01-01

    Examines the use of stochastic frontier estimation of constant elasticity of substitution (CES) cost function to measure differences in efficiency among British universities. (Contains 28 references.) (PKP)

  20. Solar central receiver prototype heliostat. Volume III. Cost estimates

    Energy Technology Data Exchange (ETDEWEB)

    None

    1978-06-01

    The Boeing heliostat design can be produced and installed for a Capital Cost of $42 per square meter at high commercial plant quantities and rates. This is 14% less than the DOE cost target. Even at a low commercial plant production rate of 25,000 heliostats per year the Capital Cost of $48 per square meter is 2% less than the cost goal established by the DOE. Projected capital costs and 30 year maintenance costs for three scenarios of production and installation are presented: (1) commercial rate production of 25,000, 250,000, and 1,000,000 heliostats per year; (2) a one-time only production quantity of 2500 heliostats; and (3) commercial rate production of 25,000 heliostats per year with each plant (25,000 heliostats) installed at widely dispersed sites throughout the Southwestern United States. These three scenarios for solar plant locations and the manufacturing/installation processes are fully described, and detailed cost breakdowns for the three scenarios are provided.

  1. Biomechanical and Cost Comparisons of Near-Far and Pin-Bar Constructs.

    Science.gov (United States)

    Whitney Kluk, Augusta; Zhang, Tina; Russell, Joseph P; Kim, Hyunchul; Hsieh, Adam H; O'Toole, Robert V

    2017-03-01

    Orthopedic dogma states that external fixator stiffness is improved by placing 1 pin close to the fracture and 1 as distant as possible ("near-far"). This fixator construct is thought to be less expensive than placing pins a shorter distance apart and using "pin-bar" clamps that attach pins to outriggers. The authors therefore hypothesized that the near-far construct is stiffer and less expensive. They compared mechanical stiffness and costs of near-far and pin-bar constructs commonly used for temporary external fixation of femoral shaft fractures. Their testing model simulated femoral shaft fractures in damage control situations. Fourth-generation synthetic femora (n=18) were used. The near-far construct had 2 pins that were 106 mm apart, placed 25 mm from the gap on each side of the fracture. The pin-bar construct pins were 55 mm apart, placed 40 mm from the gap. Mechanical testing was performed on a material test system machine. Stiffness was determined in the linear portion of the load-displacement curve for both constructs in 4 modes: axial compression, torsional loading, frontal plane 3-point bending, and sagittal plane 3-point bending. Costs were determined from a 2012 price guide. Compared with the near-far construct, the pin-bar construct had stiffness increased by 58% in axial compression (P<.05) and by 52% in torsional loading (P<.05). The pin-bar construct increased cost by 11%. In contrast to the authors' hypothesis and existing orthopedic dogma, the near-far construct was less stiff than the pin-bar construct and was similarly priced. Use of the pin-bar construct is mechanically and economically reasonable. [Orthopedics. 2017; 40(2):e238-e241.]. Copyright 2016, SLACK Incorporated.

  2. Testing Estimates of Housing Cost Differences among US Metropolitan Areas

    Directory of Open Access Journals (Sweden)

    Todd Easton

    2015-01-01

    Full Text Available This paper investigates the accuracy of six measures of housing cost differences among US metropolitan areas. Using Census data from 177 metropolitan areas, it tests the measures in two ways. First, it tests the ability of changes in the measures to predict changes in the shelter component of the metropolitan CPI from 1990 to 2000. Second, it tests the ability of the measures themselves to predict a proxy in 2000. A measure based on Fair Market Rents calculated by HUD placed second on the first test but did badly on the second. The housing component of the ACCRA index, a living cost measure frequently used by researchers, performed poorly on both tests. The top performer on both tests was a measure based on the average rent per room for a metropolitan area’s dwellings. Researchers wishing to control for living cost differences among places should consider including it in their living cost index.

  3. Estimation of marginal costs at existing waste treatment facilities.

    Science.gov (United States)

    Martinez-Sanchez, Veronica; Hulgaard, Tore; Hindsgaul, Claus; Riber, Christian; Kamuk, Bettina; Astrup, Thomas F

    2016-04-01

    This investigation aims at providing an improved basis for assessing economic consequences of alternative Solid Waste Management (SWM) strategies for existing waste facilities. A bottom-up methodology was developed to determine marginal costs in existing facilities due to changes in the SWM system, based on the determination of average costs in such waste facilities as function of key facility and waste compositional parameters. The applicability of the method was demonstrated through a case study including two existing Waste-to-Energy (WtE) facilities, one with co-generation of heat and power (CHP) and another with only power generation (Power), affected by diversion strategies of five waste fractions (fibres, plastic, metals, organics and glass), named "target fractions". The study assumed three possible responses to waste diversion in the WtE facilities: (i) biomass was added to maintain a constant thermal load, (ii) Refused-Derived-Fuel (RDF) was included to maintain a constant thermal load, or (iii) no reaction occurred resulting in a reduced waste throughput without full utilization of the facility capacity. Results demonstrated that marginal costs of diversion from WtE were up to eleven times larger than average costs and dependent on the response in the WtE plant. Marginal cost of diversion were between 39 and 287 € Mg(-1) target fraction when biomass was added in a CHP (from 34 to 303 € Mg(-1) target fraction in the only Power case), between -2 and 300 € Mg(-1) target fraction when RDF was added in a CHP (from -2 to 294 € Mg(-1) target fraction in the only Power case) and between 40 and 303 € Mg(-1) target fraction when no reaction happened in a CHP (from 35 to 296 € Mg(-1) target fraction in the only Power case). Although average costs at WtE facilities were highly influenced by energy selling prices, marginal costs were not (provided a response was initiated at the WtE to keep constant the utilized thermal capacity). Failing to systematically

  4. Identifying factors causing cost overrun of the construction projects in India

    Indian Academy of Sciences (India)

    SWAPNIL P WANJARI; GAURAV DOBARIYA

    2016-06-01

    Delay and cost overrun are common phenomena in projects worldwide. However, these are especially severe in developing countries. In India as per MOSPI report, 235 projects out of 410 were severely affected cost overrun due to certain factors. A short questionnaire was conducted with 15 prominent factorsresponsible for cost overrun and forwarded to 190 constructional professionals across India. Total 85 responses were received and it was analyzed using various statistical tools such as analysis of variance (ANOVA) and factor analysis tool using SPSS. In this study, top three factors affecting cost overruns were identified such as price escalation of raw material, delay in planned activity and lack of co-ordination between construction parties which could be significantly responsible for cost overnun of construction project in India. Factor analysismethod was also carried out to group the factors into three components of overall questionnaire. These components, such as client control component, project management component, and contractor control component,would be useful to the various parties involved in the construction activities. This paper also provides suggestive frameworks which have been framed after discussing with large number of construction professionals or expert

  5. Ford-Class Aircraft Carrier: Congress Should Consider Revising Cost Cap Legislation to Include All Construction Costs

    Science.gov (United States)

    2014-11-01

    thus increasing the likelihood of additional testing delays. For example, testing of the ship’s fire sprinklers was delayed because construction of...independent systems , which means that changes in one system are not automatically updated in the other. Consequently, the shipbuilder—and subsequently the...not deploy as scheduled or will deploy without fully tested systems . The Navy is implementing steps to achieve the $11.5 billion congressional cost

  6. 49 CFR 639.23 - Calculation of purchase or construction cost.

    Science.gov (United States)

    2010-10-01

    ...) Ancillary costs such as delivery and installation; plus (3) The net present value of the estimated future... realistic current market conditions; and (3) Based on the expected useful life of the asset in mass... for its entire expected useful life, when calculating the purchase cost, the recipient must...

  7. Probabilistic estimation of numbers and costs of future landslides in the San Francisco Bay region

    Science.gov (United States)

    Crovelli, R.A.; Coe, J.A.

    2009-01-01

    We used historical records of damaging landslides triggered by rainstorms and a newly developed Probabilistic Landslide Assessment Cost Estimation System (PLACES) to estimate the numbers and direct costs of future landslides in the 10-county San Francisco Bay region. Historical records of damaging landslides in the region are incomplete. Therefore, our estimates of numbers and costs of future landslides are minimal estimates. The estimated mean annual number of future damaging landslides for the entire 10-county region is about 65. Santa Cruz County has the highest estimated mean annual number of damaging future landslides (about 18), whereas Napa, San Francisco, and Solano Counties have the lowest estimated mean numbers of damaging landslides (about 1 each). The estimated mean annual cost of future landslides in the entire region is about US $14.80 million (year 2000 $). The estimated mean annual cost is highest for San Mateo County ($3.24 million) and lowest for Solano County ($0.18 million). The annual per capita cost for the entire region will be about $2.10. Santa Cruz County will have the highest annual per capita cost at $8.45, whereas San Francisco County will have the lowest per capita cost at $0.31. Normalising costs by dividing by the percentage of land area with slopes equal to or greater than 17% indicates that San Francisco County will have the highest cost per square km ($7,101), whereas Santa Clara County will have the lowest cost per square km ($229). These results indicate that the San Francisco Bay region has one of the highest levels of landslide risk in the United States. Compared with landslide cost estimates from the rest of the world, the risk level in the Bay region seems high, but not exceptionally high.

  8. A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction.

    Science.gov (United States)

    Fu, Fang; Zhang, Tao

    2016-01-01

    A poor quality affects project makespan and its total costs negatively, but it can be recovered by repair works during construction. We construct a new non-linear programming model based on the classic multi-mode resource constrained project scheduling problem considering repair works. In order to obtain satisfactory quality without a high increase of project cost, the objective is to minimize total quality cost which consists of the prevention cost and failure cost according to Quality-Cost Analysis. A binary dependent normal distribution function is adopted to describe the activity quality; Cumulative quality is defined to determine whether to initiate repair works, according to the different relationships among activity qualities, namely, the coordinative and precedence relationship. Furthermore, a shuffled frog-leaping algorithm is developed to solve this discrete trade-off problem based on an adaptive serial schedule generation scheme and adjusted activity list. In the program of the algorithm, the frog-leaping progress combines the crossover operator of genetic algorithm and a permutation-based local search. Finally, an example of a construction project for a framed railway overpass is provided to examine the algorithm performance, and it assist in decision making to search for the appropriate makespan and quality threshold with minimal cost.

  9. Cost estimation in software engineering projects with web components development

    Directory of Open Access Journals (Sweden)

    Javier de Andrés

    2015-01-01

    Full Text Available Existen multitud de modelos propuestos para la predicción de co stes en proyectos de software, al gunos orientados específicamen te para proyectos Web. Este trabajo analiza si los modelos específicos para proyectos Web están justifi cados, examinando el comportami ento diferencial de los costes entre proyectos de desarrollo softwar e Web y no Web. Se analizan dos aspectos del cálculo de costes: las deseconomías de escala, y el im pacto de algunas características de estos proyectos que son utilizadas como cost drivers. Se en uncian dos hipótesis: (a en estos proyect os las deseconomías de escala so n mayores y (b el incremento de coste que provocan los cost dr ivers es menor para los proyectos Web. Se contrastaron estas hipótesis a nalizando un conjunto de proyectos reales. Los resultados sugie ren que ambas hipótesis se cumplen. Por lo tanto, la principal contribu ción a la literatura de esta inv estigación es que el desarrollo de modelos específicos para los proyectos Web está justificado.

  10. Research on Reliability and Cost Integrated Optimization Algorithm of Construction Project Logistics System

    Directory of Open Access Journals (Sweden)

    Xiaoping Bai

    2013-01-01

    Full Text Available The structure of the construction project logistics system is decomposed in detail; some uncertain factors affecting system reliability are analyzed. This paper applies the probability-influence coordinate graph to screen out the logistics subsystem that has great influence on system reliability under the conditions of occurring failure, and establishes an allocation model of the reliability index in construction project logistics system based on the restriction of cost, makes use of the presented model and algorithm to calculate the cost-based reliability, contrasts it with the index reliability assigned by the scoring method to the optimal distribution value of reliability index and the optimal cost. The presented detailed methods and steps can offer the meaningful reference for reliability optimization management of the logistics system in the construction project.

  11. The Cost Monitoring of the Construction Machinery with Using the Stochastic Progress-Based S-curves

    Directory of Open Access Journals (Sweden)

    Krajňák Marek

    2015-06-01

    Full Text Available Contribution presents methodology for evaluating at-completion project performance status. Accurate cost and schedule project forecasts are difficult to generate when considering the impact of such events as unforeseen cost changes, material delays, scope deviation, changes to the project execution plan and poor subcontractor performance. In reality, the original estimate may be considered the first project forecast and at the point of project completion, the latest updated estimate (last forecast and the actual amount of what is being expended should be the same. Final project performance is determined by comparing the planned budget and project duration, with the expected forecasted final budget and elapsed time. The stochastic S-curve methodology permits objective evaluation of project performance without the limitations inherent in a deterministic approach. This paper used the stochastic S curve to monitor the cost and time consumption in operation of the construction machines. The contribution presents a partial outcome from the dissertation thesis called the Interactive tools for resource optimization in construction.

  12. 31 CFR Appendix I(f) to Part 13 - Estimated Overhead and Administrative Costs

    Science.gov (United States)

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Estimated Overhead and Administrative Costs I(F) Appendix I(F) to Part 13 Money and Finance: Treasury Office of the Secretary of the Treasury... Pt. 13, App. I(F) Appendix I(F) to Part 13—Estimated Overhead and Administrative Costs Date:...

  13. 40 CFR 264.144 - Cost estimate for post-closure care.

    Science.gov (United States)

    2010-07-01

    ... dollars or by using an inflation factor derived from the most recent Implicit Price Deflator for Gross... facility, the owner or operator must adjust the post-closure cost estimate for inflation within 60 days... cost estimate must be updated for inflation within 30 days after the close of the firm's fiscal year...

  14. 40 CFR 265.144 - Cost estimate for post-closure care.

    Science.gov (United States)

    2010-07-01

    ... current dollars or by using an inflation factor derived from the most recent Implicit Price Deflator for... of the facility, the owner or operator must adjust the post-closure cost estimate for inflation...-closure care cost estimate must be updated for inflation no later than 30 days after the close of the firm...

  15. Estimating Performance Time for Air Force Military Construction Projects

    Science.gov (United States)

    2005-03-01

    Arditi et al, (1985) NEDO, (1988) Mansfield et al, (1994) Naoum, (1991) Assaf et al, (1995) Chan and Kumaraswam y, (1997) Kaming et al, (1997...00 0, 00 0 Project Cost D ur at io n (d ay s) Regression Line Data Upper/Lower Quartiles 212 Bibliography Arditi ,D., G.T. Akan, and S. Gurdamer

  16. Designing to target cost: one approach to design/construction integration

    DEFF Research Database (Denmark)

    Jørgensen, Bo

    2005-01-01

    One approach to a more integrated construction delivery process is the concept of ‘designing to target cost’ of which the first examples of application within a lean construction framework have recently been seen. This paper introduces the main principles of the design to target cost method...... and discusses the applicability of this approach to construction. The low degree of organizational and technical continuity from one construction project to the next limits the applicability of the design for target cost approach when compared to its origin in product development of mass manufactured artefacts....... The approach can, however, be applied as a way of substantially involving the production organisation from the earliest phases of schematic design and thus contribute to enhanced value and reduced waste for the overall project delivery as well as for the many assignments of which it is ultimately composed...

  17. Guaranteed cost control with constructing switching law of uncertain discrete-time switched systems

    Institute of Scientific and Technical Information of China (English)

    Zhang Ying; Duan Guangren

    2007-01-01

    A guaranteed cost control problem for a class of linear discrete-time switched systems with normbounded uncertainties is considered in this article. The purpose is to construct a switching rule and design a state feedback control law, such that, the closed-loop system is asymptotically stable and the closed-loop cost function value is not more than a specified upper bound for all admissible uncertainties under the constructed switching rule.A sufficient condition for the existence of guaranteed cost controllers and switching rules is derived based on the Lyapunov theory together with the linear matrix inequality (LMI) approach. Furthermore, a convex optimization problem with LMI constraints is formulated to select the suboptimal guaranteed cost controller. A numerical example demonstrates the validity of the proposed design approach.

  18. Estimating the costs of intensity-modulated and 3-dimensional conformal radiotherapy in Ontario.

    Science.gov (United States)

    Yong, J H E; McGowan, T; Redmond-Misner, R; Beca, J; Warde, P; Gutierrez, E; Hoch, J S

    2016-06-01

    Radiotherapy is a common treatment for many cancers, but up-to-date estimates of the costs of radiotherapy are lacking. In the present study, we estimated the unit costs of intensity-modulated radiotherapy (imrt) and 3-dimensional conformal radiotherapy (3D-crt) in Ontario. An activity-based costing model was developed to estimate the costs of imrt and 3D-crt in prostate cancer. It included the costs of equipment, staff, and supporting infrastructure. The framework was subsequently adapted to estimate the costs of radiotherapy in breast cancer and head-and-neck cancer. We also tested various scenarios by varying the program maturity and the use of volumetric modulated arc therapy (vmat) alongside imrt. From the perspective of the health care system, treating prostate cancer with imrt and 3D-crt respectively cost $12,834 and $12,453 per patient. The cost of radiotherapy ranged from $5,270 to $14,155 and was sensitive to analytic perspective, radiation technique, and disease site. Cases of head-and-neck cancer were the most costly, being driven by treatment complexity and fractions per treatment. Although imrt was more costly than 3D-crt, its cost will likely decline over time as programs mature and vmat is incorporated. Our costing model can be modified to estimate the costs of 3D-crt and imrt for various disease sites and settings. The results demonstrate the important role of capital costs in studies of radiotherapy cost from a health system perspective, which our model can accommodate. In addition, our study established the need for future analyses of imrt cost to consider how vmat affects time consumption.

  19. Estimating the costs of intensity-modulated and 3-dimensional conformal radiotherapy in Ontario

    Science.gov (United States)

    Yong, J.H.E.; McGowan, T.; Redmond-Misner, R.; Beca, J.; Warde, P.; Gutierrez, E.; Hoch, J.S.

    2016-01-01

    Background Radiotherapy is a common treatment for many cancers, but up-to-date estimates of the costs of radiotherapy are lacking. In the present study, we estimated the unit costs of intensity-modulated radiotherapy (imrt) and 3-dimensional conformal radiotherapy (3D-crt) in Ontario. Methods An activity-based costing model was developed to estimate the costs of imrt and 3D-crt in prostate cancer. It included the costs of equipment, staff, and supporting infrastructure. The framework was subsequently adapted to estimate the costs of radiotherapy in breast cancer and head-and-neck cancer. We also tested various scenarios by varying the program maturity and the use of volumetric modulated arc therapy (vmat) alongside imrt. Results From the perspective of the health care system, treating prostate cancer with imrt and 3D-crt respectively cost $12,834 and $12,453 per patient. The cost of radiotherapy ranged from $5,270 to $14,155 and was sensitive to analytic perspective, radiation technique, and disease site. Cases of head-and-neck cancer were the most costly, being driven by treatment complexity and fractions per treatment. Although imrt was more costly than 3D-crt, its cost will likely decline over time as programs mature and vmat is incorporated. Conclusions Our costing model can be modified to estimate the costs of 3D-crt and imrt for various disease sites and settings. The results demonstrate the important role of capital costs in studies of radiotherapy cost from a health system perspective, which our model can accommodate. In addition, our study established the need for future analyses of imrt cost to consider how vmat affects time consumption. PMID:27330359

  20. Estimating Resource Costs of Levy Campaigns in Five Ohio School Districts

    Science.gov (United States)

    Ingle, W. Kyle; Petroff, Ruth Ann; Johnson, Paul A.

    2011-01-01

    Using Levin and McEwan's (2001) "ingredients method," this study identified the major activities and associated costs of school levy campaigns in five districts. The ingredients were divided into one of five cost categories--human resources, facilities, fees, marketing, and supplies. As to overall costs of the campaigns, estimates ranged…

  1. International comparisons of cost and productivity in construction: a bad example

    Directory of Open Access Journals (Sweden)

    Rick Best

    2012-09-01

    Full Text Available In a report published in June 2012 the Business Council of Australia (BCA reported that it costs considerably more to build a variety of types of infrastructure in Australia than it does in the US. Airports (90% more costly and hospitals (62% were quoted as the worst cases with other projects ranging from 26% to 43% more. They used these figures to conclude that Australia is a high cost, low productivity environment for building infrastructure projects. These claims were based on cost/m2 figures published by a major international construction consultancy. The method used by the BCA is flawed in two ways: one is the in the use of costs that are recognised as giving only the broadest of indications of probable costs and the second is the use of exchange rates to convert Australian construction costs to US dollars. Careful analysis of the methodology used, supported by a series of other comparisons based on other data sources and other conversion factors (purchasing power parities or PPPs, suggests that in real terms it probably costs no more to build in Australia than it does in the US and that it may well be cheaper to build in Australia than it is in the US.

  2. Payroll costs not identified by phase in construction work done with no third subcontracted

    Directory of Open Access Journals (Sweden)

    Rubén Antonio González Franco

    2012-05-01

    Full Text Available The Social Insurance Regulations applicable to the construction companies with regard to meeting high work requires the owner to generate high for each construction phase and thus to check the amounts of materials, machinery and equipment, as well as labor applied at the same stage, all in order to validate that it complies 100% with the payment of worker-employer contributions by the employer, guidelines in the specific case of SMEs practice becomes more complex, controls as these companies have no proof phased costs in two areas in particular, as are exercised costs of materials and workmanship for housing, which is why this research aims to solve the problem of generating clear guidelines to comply with the verification of payment of contributions in the field of labor when it is exerciseddirectly, and through the application of direct interviews and questionnaires to the units of analysis consists of businessmen, representatives, directors or business accountants SMEs construction, staff of the National Chamber of construction Industry and the Mexican Social Security Institute head of the Department of construction, who will answer questions the same instrument provides, and with this it was determined that in fact the perception of these SMEs is required to leave a standard criterion for testing and would be more appropriate apportionment of costs proportionately based on hire dates and termination dates of the work keeping track of costs identifying overall, leaving an identification number in the working papers for further review by the authority.

  3. Verification of Cost Estimating Procedures for MAPS Computer Program.

    Science.gov (United States)

    1982-05-01

    gpd/ft Filtration Type media: Dual Loading rate: 5 gpm/ft Chlorination Storage: Tank cars Ammonia Powdered carbon Clearwell 2 to 25 mg belowground...cost functions for conventional treatment MAPS water treatment module does not account for intakes, sludge han- dling, clearwells , high service

  4. Aircraft Contractor Logistics Support: A Cost Estimating Guide.

    Science.gov (United States)

    1983-09-01

    April 1983. 17. Enright , Mike. C-20A Cost Analyst, WPAFB OH. Per- sonal interview. 15 August 1983. 18. Fatkin, Allen. AFSC CAIG Research Report NRI...Aviation, Peterson AFB CO. Telephone interview. 11 May 1983. 32. Robert , Bob. Engineer for Doss Aviation, Randolph AFB TX. Telephone interview. 17 June

  5. An Analysis of Cost Premiums and Losses Associated with USAF Military Construction (MILCON)

    Science.gov (United States)

    2013-03-01

    outside of MILCON procurement. Additionally, project signage requirements do not represent a MILCON cost premium. Although the USACE prescribes exact... signage specifications for the construction site, this cost is negligible for a MILCON project since private industry utilizes similar signs...8A/small-business policies Moderate 3.175 1 18 9 6 11 Specific Direct digital controls for all HVAC components Moderate 3.139 1 4 19 25 12 General

  6. Estimation of construction and demolition waste using waste generation rates in Chennai, India.

    Science.gov (United States)

    Ram, V G; Kalidindi, Satyanarayana N

    2017-06-01

    A large amount of construction and demolition waste is being generated owing to rapid urbanisation in Indian cities. A reliable estimate of construction and demolition waste generation is essential to create awareness about this stream of solid waste among the government bodies in India. However, the required data to estimate construction and demolition waste generation in India are unavailable or not explicitly documented. This study proposed an approach to estimate construction and demolition waste generation using waste generation rates and demonstrated it by estimating construction and demolition waste generation in Chennai city. The demolition waste generation rates of primary materials were determined through regression analysis using waste generation data from 45 case studies. Materials, such as wood, electrical wires, doors, windows and reinforcement steel, were found to be salvaged and sold on the secondary market. Concrete and masonry debris were dumped in either landfills or unauthorised places. The total quantity of construction and demolition debris generated in Chennai city in 2013 was estimated to be 1.14 million tonnes. The proportion of masonry debris was found to be 76% of the total quantity of demolition debris. Construction and demolition debris forms about 36% of the total solid waste generated in Chennai city. A gross underestimation of construction and demolition waste generation in some earlier studies in India has also been shown. The methodology proposed could be utilised by government bodies, policymakers and researchers to generate reliable estimates of construction and demolition waste in other developing countries facing similar challenges of limited data availability.

  7. Estimating the cost of new drug development: is it really 802 million dollars?

    Science.gov (United States)

    Adams, Christopher P; Brantner, Van V

    2006-01-01

    This paper replicates the drug development cost estimates of Joseph DiMasi and colleagues ("The Price of Innovation"), using their published cost estimates along with information on success rates and durations from a publicly available data set. For drugs entering human clinical trials for the first time between 1989 and 2002, the paper estimated the cost per new drug to be 868 million dollars. However, our estimates vary from around 500 million dollars to more than 2,000 million dollars, depending on the therapy or the developing firm.

  8. 2002 IDA Cost Research Symposium: Estimating the Costs of Transforming U.S. Military Forces

    Science.gov (United States)

    2002-08-01

    Missile Database Improvements • ACEIT Enhancements VIII-5 6I n t e g r i t y - S e r v i c e - E x c e l l e n c e Capability to Cost...systems • Expand CERs • Create interface to download to CO$STAT for CER development • Extract CERs and move them into ACEIT • Supports: Conventional...Cost Model MDA–5 Integrating MDA Cost Risk Model with ACEIT MDA–6 Target Common Cost Model MDA–7 Deployable Optics Development and Manufacturing MDA

  9. Molten Salt: Concept Definition and Capital Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Stoddard, Larry [Black & Veatch, Kansas City, MO (United States); Andrew, Daniel [Black & Veatch, Kansas City, MO (United States); Adams, Shannon [Black & Veatch, Kansas City, MO (United States); Galluzzo, Geoff [Black & Veatch, Kansas City, MO (United States)

    2016-06-30

    The Department of Energy’s (DOE’s) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO has a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and to reduce costs 30 percent further by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO2 (sCO2) cycles. DOE retained Black & Veatch to support SETO’s SunShot Initiative for CSP solar power tower technology in the following areas: 1. Concept definition, including costs and schedule, of a flexible test facility to be used to test and prove components in part to support financing. 2. Concept definition, including costs and schedule, of an integrated high temperature molten salt (MS) facility with thermal energy storage and with a supercritical CO2 cycle generating approximately 10MWe. 3. Concept definition, including costs and schedule, of an integrated high temperature falling particle facility with thermal energy storage and with a supercritical CO2

  10. Estimating Power Outage Cost based on a Survey for Industrial Customers

    Science.gov (United States)

    Yoshida, Yoshikuni; Matsuhashi, Ryuji

    A survey was conducted on power outage cost for industrial customers. 5139 factories, which are designated energy management factories in Japan, answered their power consumption and the loss of production value due to the power outage in an hour in summer weekday. The median of unit cost of power outage of whole sectors is estimated as 672 yen/kWh. The sector of services for amusement and hobbies and the sector of manufacture of information and communication electronics equipment relatively have higher unit cost of power outage. Direct damage cost from power outage in whole sectors reaches 77 billion yen. Then utilizing input-output analysis, we estimated indirect damage cost that is caused by the repercussion of production halt. Indirect damage cost in whole sectors reaches 91 billion yen. The sector of wholesale and retail trade has the largest direct damage cost. The sector of manufacture of transportation equipment has the largest indirect damage cost.

  11. Estimation of marginal costs at existing waste treatment facilities

    DEFF Research Database (Denmark)

    Martinez Sanchez, Veronica; Hulgaard, Tore; Hindsgaul, Claus

    2016-01-01

    This investigation aims at providing an improved basis for assessing economic consequences of alternative Solid Waste Management (SWM) strategies for existing waste facilities. A bottom-up methodology was developed to determine marginal costs in existing facilities due to changes in the SWM system...... (CHP) and another with only power generation (Power), affected by diversion strategies of five waste fractions (fibres, plastic, metals, organics and glass), named "target fractions". The study assumed three possible responses to waste diversion in the WtE facilities: (i) biomass was added to maintain......, based on the determination of average costs in such waste facilities as function of key facility and waste compositional parameters. The applicability of the method was demonstrated through a case study including two existing Waste-to-Energy (WtE) facilities, one with co-generation of heat and power...

  12. Enhancing Cost Realism through Risk-Driven Contracting: Designing Incentive Fees Based on Probabilistic Cost Estimates

    Science.gov (United States)

    2012-04-01

    it would award a CPFF contract to what it knew to be the lowest cost contractor to avoid the risk premium of incentive contracts ( Samuelson , 1986... Samuelson , W. (1986). Bidding for contracts. Management Science, 32(12), 1533–1550. Scherer, F. M. (1964). The theory of contractual incentives for cost

  13. Estimating the indirect costs associated with the expected number of cancer cases in Mexico by 2020

    OpenAIRE

    Cristina Gutiérrez-Delgado; Daniel Armas-Texta; Nancy Reynoso-Noverón; Abelardo Meneses-García; Alejandro Mohar-Betancourt

    2016-01-01

    Objective. To estimate the indirect costs generated by adults with cancer in Mexico from 2002-2020. Materials and methods. Using information from national sources and the national cancer incidence from GLOBOCAN, we estimated income lost due to premature death (ILPD), short-term benefits (STBs), disability pensions (DPs), and opportunity costs for the carer (OCCs) generated by patients with cancer. Amounts were reported in Mexican pesos. Results. We estimated 23 359 deaths and 216 679 new case...

  14. Estimating the Cost of Product Recycling with the Use of Ecodesign Support System

    Directory of Open Access Journals (Sweden)

    Karwasz Anna

    2016-03-01

    Full Text Available The paper focuses on issues associated with the ecodesign of household appliances. The authors describe the estimation of recycling cost of end-of-life products using their original system supporting ecodesign. The cost estimate was conducted during product design stage using the information stored in CAD 3D system. A sample estimate was made for a washing machine, fridge, kettle, and a hairdryer.

  15. Estimating Lifetime Costs of Social Care: A Bayesian Approach Using Linked Administrative Datasets from Three Geographical Areas.

    Science.gov (United States)

    Steventon, Adam; Roberts, Adam

    2015-12-01

    We estimated lifetime costs of publicly funded social care, covering services such as residential and nursing care homes, domiciliary care and meals. Like previous studies, we constructed microsimulation models. However, our transition probabilities were estimated from longitudinal, linked administrative health and social care datasets, rather than from survey data. Administrative data were obtained from three geographical areas of England, and we estimated transition probabilities in each of these sites flexibly using Bayesian methods. This allowed us to quantify regional variation as well as the impact of structural and parameter uncertainty regarding the transition probabilities. Expected lifetime costs at age 65 were £20,200-27,000 for men and £38,700-49,000 for women, depending on which of the three areas was used to calibrate the model. Thus, patterns of social care spending differed markedly between areas, with mean costs varying by almost £10,000 (25%) across the lifetime for people of the same age and gender. Allowing for structural and parameter uncertainty had little impact on expected lifetime costs, but slightly increased the risk of very high costs, which will have implications for insurance products for social care through increasing requirements for capital reserves.

  16. Estimating the mental health costs of racial discrimination

    OpenAIRE

    Elias, Amanuel; Paradies, Yin

    2016-01-01

    Background Racial discrimination is a pervasive social problem in several advanced countries such as the U.S., U.K., and Australia. Public health research also indicates a range of associations between exposure to racial discrimination and negative health, particularly, mental health including depression, anxiety, and post-traumatic stress disorder (PTSD). However, the direct negative health impact of racial discrimination has not been costed so far although economists have previously estimat...

  17. Cost Estimates Of Concentrated Photovoltaic Heat Sink Production

    Science.gov (United States)

    2016-06-01

    also researched through analyzing electricity rate data, CPV market research , and a firsthand account with an industry representative from a... capital costs and intermittency (DASN, 2012). While the price per kWh of solar is falling as the solar market continues to mature, solar installation...grow (evolve India). Retrieved from http://evolveindia.in/blog/2015/10/24/solar-tracker- market - expected-to-grow/ NREL. (2016). Best research cell

  18. Estimating the mental health costs of racial discrimination

    OpenAIRE

    Elias, Amanuel; Paradies, Yin

    2016-01-01

    Background Racial discrimination is a pervasive social problem in several advanced countries such as the U.S., U.K., and Australia. Public health research also indicates a range of associations between exposure to racial discrimination and negative health, particularly, mental health including depression, anxiety, and post-traumatic stress disorder (PTSD). However, the direct negative health impact of racial discrimination has not been costed so far although economists have previously estimat...

  19. Falling Particles: Concept Definition and Capital Cost Estimate

    Energy Technology Data Exchange (ETDEWEB)

    Stoddard, Larry [Black & Veatch, Kansas City, MO (United States); Galluzzo, Geoff [Black & Veatch, Kansas City, MO (United States); Adams, Shannon [Black & Veatch, Kansas City, MO (United States); Andrew, Daniel [Black & Veatch, Kansas City, MO (United States)

    2016-06-30

    The Department of Energy’s (DOE) Office of Renewable Power (ORP) has been tasked to provide effective program management and strategic direction for all of the DOE’s Energy Efficiency & Renewable Energy’s (EERE’s) renewable power programs. The ORP’s efforts to accomplish this mission are aligned with national energy policies, DOE strategic planning, EERE’s strategic planning, Congressional appropriation, and stakeholder advice. ORP is supported by three renewable energy offices, of which one is the Solar Energy Technology Office (SETO) whose SunShot Initiative has a mission to accelerate research, development and large scale deployment of solar technologies in the United States. SETO has a goal of reducing the cost of Concentrating Solar Power (CSP) by 75 percent of 2010 costs by 2020 to reach parity with base-load energy rates, and to reduce costs 30 percent further by 2030. The SunShot Initiative is promoting the implementation of high temperature CSP with thermal energy storage allowing generation during high demand hours. The SunShot Initiative has funded significant research and development work on component testing, with attention to high temperature molten salts, heliostats, receiver designs, and high efficiency high temperature supercritical CO2 (sCO2) cycles.

  20. Estimation of Congestion Cost of Private Passenger Car Users in Malioboro, Yogyakarta

    OpenAIRE

    Sutomo H.; Munawar A.; Malkhamah S.; Sugiyanto G.

    2010-01-01

    Congestion is the condition when the hourly traffic demand exceeds the maximum sustainable hourly throughout of the link. The aim of this research is to estimate the congestion cost of private passenger car users in central business district along the corridor of Malioboro, Yogyakarta, Indonesia. The amount of the congestion cost is the difference between perceived and actual generalized cost in traffic jam condition. In this paper, only the congestion costs of private passenger car users are...

  1. Development of a life cycle cost estimating framework for oil refineries

    OpenAIRE

    Okafor, Okechukwu Peter

    2011-01-01

    This study is concerned with the understanding of some vital features of various life cycle costing methodologies and tools. Integrating these features with the refinery technical processes would assist in the development of a life cycle costing framework for oil refineries. The aim of this research is to develop a comprehensive life cycle cost estimating framework for the evaluation of not only the total cost and system effectiveness of new refineries but also the revamping, and maintenance ...

  2. Cost Estimates for Designing and Implementing a Novel Team Care Model for Chronically Ill Patients.

    Science.gov (United States)

    Panattoni, Laura; Dillon, Ellis; Hurlimann, Lily; Durbin, Meg; Tai-Seale, Ming

    2017-09-25

    Little is known about the cost of implementing chronic care models. We estimate the human resource cost of implementing a novel team-based chronic care model "Champion," at a large multispecialty group practice. We used activity-based costing to calculate costs from development through rollout and stabilization in 1 clinic with 12 000 chronic care patients. Data analyzed included Microsoft Outlook meeting metadata, supporting documents, and 2014 employee wages. Implementation took more than 29 months, involved 168 employees, and cost the organization $2 304 787. Payers may need to consider a mixed-payment model to support the both implementation and maintenance costs of team-based chronic care.

  3. Hyperketonemia in early lactation dairy cattle: a deterministic estimate of component and total cost per case.

    Science.gov (United States)

    McArt, J A A; Nydam, D V; Overton, M W

    2015-03-01

    The purpose of this study was to develop a deterministic economic model to estimate the costs associated with (1) the component cost per case of hyperketonemia (HYK) and (2) the total cost per case of HYK when accounting for costs related to HYK-attributed diseases. Data from current literature was used to model the incidence and risks of HYK (defined as a blood β-hydroxybutyrate concentration≥1.2 mmol/L), displaced abomasa (DA), metritis, disease associations, milk production, culling, and reproductive outcomes. The component cost of HYK was estimated based on 1,000 calvings per year; the incidence of HYK in primiparous and multiparous animals; the percent of animals receiving clinical treatment; the direct costs of diagnostics, therapeutics, labor, and death loss; and the indirect costs of future milk production losses, future culling losses, and reproduction losses. Costs attributable to DA and metritis were estimated based on the incidence of each disease in the first 30 DIM; the number of cases of each disease attributable to HYK; the direct costs of diagnostics, therapeutics, discarded milk during treatment and the withdrawal period, veterinary service (DA only), and death loss; and the indirect costs of future milk production losses, future culling losses, and reproduction losses. The component cost per case of HYK was estimated at $134 and $111 for primiparous and multiparous animals, respectively; the average component cost per case of HYK was estimated to be $117. Thirty-four percent of the component cost of HYK was due to future reproductive losses, 26% to death loss, 26% to future milk production losses, 8% to future culling losses, 3% to therapeutics, 2% to labor, and 1% to diagnostics. The total cost per case of HYK was estimated at $375 and $256 for primiparous and multiparous animals, respectively; the average total cost per case of HYK was $289. Forty-one percent of the total cost of HYK was due to the component cost of HYK, 33% to costs

  4. Solid Waste Operations Complex W-113, Detail Design Report (Title II). Volume 4: Project cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Solid Waste Retrieval Facility--Phase 1 (Project W113) will provide the infrastructure and the facility required to retrieve from Trench 04, Burial ground 4C, contact handled (CH) drums and boxes at a rate that supports all retrieved TRU waste batching, treatment, storage, and disposal plans. This includes (1) operations related equipment and facilities, viz., a weather enclosure for the trench, retrieval equipment, weighing, venting, obtaining gas samples, overpacking, NDE, NDA, shipment of waste and (2) operations support related facilities, viz., a general office building, a retrieval staff change facility, and infrastructure upgrades such as supply and routing of water, sewer, electrical power, fire protection, roads, and telecommunication. Title I design for the operations related equipment and facilities was performed by Raytheon/BNFL, and that for the operations support related facilities including infrastructure upgrade was performed by KEH. These two scopes were combined into an integrated W113 Title II scope that was performed by Raytheon/BNFL. This volume represents the total estimated costs for the W113 facility. Operating Contractor Management costs have been incorporated as received from WHC. The W113 Facility TEC is $19.7 million. This includes an overall project contingency of 14.4% and escalation of 17.4%. A January 2001 construction contract procurement start date is assumed.

  5. Construction and Characterization of a Compact, Portable, Low-Cost Colorimeter for the Chemistry Lab

    Science.gov (United States)

    Clippard, Carrie M.; Hughes, William; Chohan, Balwant S.; Sykes, Danny G.

    2016-01-01

    A low-cost and portable colorimeter was constructed featuring a low-voltage programmable color light sensor-to-frequency converter, a CMOS 8-bit microcontroller, and an LCD display. The instrument has successfully facilitated the introduction and application of spectroscopy to groups of middle school, high school, and undergraduate students. A…

  6. The Hospitalization Costs of Diabetes and Hypertension Complications in Zimbabwe: Estimations and Correlations

    Directory of Open Access Journals (Sweden)

    Mutsa P. Mutowo

    2016-01-01

    Full Text Available Objective. Treating complications associated with diabetes and hypertension imposes significant costs on health care systems. This study estimated the hospitalization costs for inpatients in a public hospital in Zimbabwe. Methods. The study was retrospective and utilized secondary data from medical records. Total hospitalization costs were estimated using generalized linear models. Results. The median cost and interquartile range (IQR for patients with diabetes, $994 (385–1553 mean $1319 (95% CI: 981–1657, was higher than patients with hypertension, $759 (494–1147 mean $914 (95% CI: 825–1003. Female patients aged below 65 years with diabetes had the highest estimated mean costs ($1467 (95% CI: 1177–1828. Wound care had the highest estimated mean cost of all procedures, $2884 (95% CI: 2004–4149 for patients with diabetes and $2239 (95% CI: 1589–3156 for patients with hypertension. Age below 65 years, medical procedures (amputation, wound care, dialysis, and physiotherapy, the presence of two or more comorbidities, and being prescribed two or more drugs were associated with significantly higher hospitalization costs. Conclusion. Our estimated costs could be used to evaluate and improve current inpatient treatment and management of patients with diabetes and hypertension and determine the most cost-effective interventions to prevent complications and comorbidities.

  7. Survey of State-Level Cost and Benefit Estimates of Renewable Portfolio Standards

    Energy Technology Data Exchange (ETDEWEB)

    Heeter, J.; Barbose, G.; Bird, L.; Weaver, S.; Flores-Espino, F.; Kuskova-Burns, K.; Wiser, R.

    2014-05-01

    Most renewable portfolio standards (RPS) have five or more years of implementation experience, enabling an assessment of their costs and benefits. Understanding RPS costs and benefits is essential for policymakers evaluating existing RPS policies, assessing the need for modifications, and considering new policies. This study provides an overview of methods used to estimate RPS compliance costs and benefits, based on available data and estimates issued by utilities and regulators. Over the 2010-2012 period, average incremental RPS compliance costs in the United States were equivalent to 0.8% of retail electricity rates, although substantial variation exists around this average, both from year-to-year and across states. The methods used by utilities and regulators to estimate incremental compliance costs vary considerably from state to state and a number of states are currently engaged in processes to refine and standardize their approaches to RPS cost calculation. The report finds that state assessments of RPS benefits have most commonly attempted to quantitatively assess avoided emissions and human health benefits, economic development impacts, and wholesale electricity price savings. Compared to the summary of RPS costs, the summary of RPS benefits is more limited, as relatively few states have undertaken detailed benefits estimates, and then only for a few types of potential policy impacts. In some cases, the same impacts may be captured in the assessment of incremental costs. For these reasons, and because methodologies and level of rigor vary widely, direct comparisons between the estimates of benefits and costs are challenging.

  8. Performance and cost comparison of a FWS and a VSF constructed wetland system.

    Science.gov (United States)

    Tsihrintzis, V A; Akratos, C S; Gikas, G D; Karamouzis, D; Angelakis, A N

    2007-06-01

    Two constructed wetland systems, treating domestic wastewater, are compared in terms of performance and costs. One is a free water surface (FWS) wetland system located in Pompia, Crete, south Greece, and the other one is a vertical subsurface flow (VSF) wetland system located in Comati, Chalkidiki, north Greece. The FWS system is designed for 1200 p.e. Its construction cost was Euro 305,000, and the capital, operation and maintenance cost was Euro 22.07 p.e.(-1) yr(-1) or Euro 0.50 m(-3) of influent. The VSF system is designed for 1000 p.e. Its construction cost was Euro 410,850, and the capital, operation and maintenance cost was Euro 36.81 p.e.(-1) yr(-1) or Euro 0.56 m(-3) of influent. Both systems achieved high removal rates for BOD5, COD, TSS, TKN, phosphorus, TC, and FC, which makes them ideal for small communities in the Mediterranean region.

  9. Revised cost savings estimate with uncertainty for enhanced sludge washing of underground storage tank waste

    Energy Technology Data Exchange (ETDEWEB)

    DeMuth, S.

    1998-09-01

    Enhanced Sludge Washing (ESW) has been selected to reduce the amount of sludge-based underground storage tank (UST) high-level waste at the Hanford site. During the past several years, studies have been conducted to determine the cost savings derived from the implementation of ESW. The tank waste inventory and ESW performance continues to be revised as characterization and development efforts advance. This study provides a new cost savings estimate based upon the most recent inventory and ESW performance revisions, and includes an estimate of the associated cost uncertainty. Whereas the author`s previous cost savings estimates for ESW were compared against no sludge washing, this study assumes the baseline to be simple water washing which more accurately reflects the retrieval activity along. The revised ESW cost savings estimate for all UST waste at Hanford is $6.1 B {+-} $1.3 B within 95% confidence. This is based upon capital and operating cost savings, but does not include development costs. The development costs are assumed negligible since they should be at least an order of magnitude less than the savings. The overall cost savings uncertainty was derived from process performance uncertainties and baseline remediation cost uncertainties, as determined by the author`s engineering judgment.

  10. A review of deepwater pipeline construction in the U.S. Gulf of Mexico-Contracts, cost, and installation methods

    Science.gov (United States)

    Kaiser, Mark J.

    2016-09-01

    The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980-2014 are described based on OTC/SPE industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was 2.76 million/mi and ranged from 520 000/mi to 12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from 1 to 6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at 3.1 million/mi.

  11. A Review of Deepwater Pipeline Construction in the U.S. Gulf of Mexico-Contracts, Cost, and Installation Methods

    Institute of Scientific and Technical Information of China (English)

    Mark J. Kaiser

    2016-01-01

    The offshore pipeline network in the U.S. Gulf of Mexico is the largest and most transparent system in the world. A review of deepwater projects in the region provides insight into construction cost and installation methods and the evolution of contract strategies. Pipeline projects are identified as export systems, infield flowline systems, and combined export and infield systems, and three dozen deepwater pipeline installations from 1980–2014 are described based on Offshore Technology Conference (OTC) and Society of Petroleum Engineers (SPE) industry publications and press release data. Export lines and infield flowlines are equally represented and many projects used a combination of J-lay, S-lay and reel methods with rigid steel, flexible line, and pipe-in-pipe systems. The average 2014 inflation-adjusted cost for pipeline projects based on OTC/SPE publications was$2.76 million/mi and ranged from$520 000/mi to$12.94 million/mi. High cost pipelines tend to be short segments or specialized pipeline. Excluding the two cost endpoints, the majority of projects ranged from $1 to $6 million/mi. The average inflation-adjusted cost to install deepwater pipelines in the U.S. Gulf of Mexico based on available public data is estimated at $3.1 million/mi.

  12. Real-Time Multi-View Face Detection and Pose Estimation Based on Cost-Sensitive AdaBoost

    Institute of Scientific and Technical Information of China (English)

    MA Yong; DING Xiaoqing

    2005-01-01

    Locating multi-view faces in images with a complex background remains a challenging problem. In this paper, an integrated method for real-time multi-view face detection and pose estimation is presented. A simple-to-complex and coarse-to-fine view-based detector architecture has been designed to detect multi-view faces and estimate their poses efficiently. Both the pose estimators and the view-based face/nonface detectors are trained by a cost-sensitive AdaBoost algorithm to improve the generalization ability. Experimental results show that the proposed multi-view face detector, which can be constructed easily, gives more robust face detection and pose estimation and has a faster real-time detection speed compared with other conventional methods.

  13. Construction and calibration of a low cost and fully automated vibrating sample magnetometer

    Energy Technology Data Exchange (ETDEWEB)

    El-Alaily, T.M., E-mail: toson_alaily@yahoo.com [Physics Department, Faculty of Science, Tanta University, Tanta (Egypt); El-Nimr, M.K.; Saafan, S.A.; Kamel, M.M.; Meaz, T.M. [Physics Department, Faculty of Science, Tanta University, Tanta (Egypt); Assar, S.T. [Engineering Physics and Mathematics Department, Faculty of Engineering, Tanta University, Tanta (Egypt)

    2015-07-15

    A low cost vibrating sample magnetometer (VSM) has been constructed by using an electromagnet and an audio loud speaker; where both are controlled by a data acquisition device. The constructed VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. The apparatus has been calibrated and tested by using magnetic hysteresis data of some ferrite samples measured by two scientifically calibrated magnetometers; model (Lake Shore 7410) and model (LDJ Electronics Inc. Troy, MI). Our VSM lab-built new design proved success and reliability. - Highlights: • A low cost automated vibrating sample magnetometer VSM has been constructed. • The VSM records the magnetic hysteresis loop up to 8.3 KG at room temperature. • The VSM has been calibrated and tested by using some measured ferrite samples. • Our VSM lab-built new design proved success and reliability.

  14. Evaluation of economic effects of population ageing--methodology of estimating indirect costs.

    Science.gov (United States)

    Schubert, Agata; Czech, Marcin; Gębska-Kuczerowska, Anita

    2015-01-01

    Process of demographic ageing, especially in recent decades, is steadily growing in dynamics and importance due to increasing health-related needs and expectations with regard to a guarantee of social services. Elaboration of the most effective model of care, tailored to Polish conditions, requires an estimation of actual costs of this care, including indirect costs which are greatly related to informal care. The fact that the costs of informal care are omitted, results from a determined approach to analyses. It is discussed only from a perspective of budget for health and does not cover societal aspects. In such situation, however, the costs borne by a receiver of services are neglected. As a consequence, the costs of informal care are underestimated or often excluded from calculations, even if they include indirect costs. Comprehensive methodological approach for estimating the costs of informal care seems to be important for a properly conducted economic evaluation in health care sector.

  15. Estimating the costs of implementing the rotavirus vaccine in the national immunisation programme

    DEFF Research Database (Denmark)

    Madsen, Lizell B; Ustrup, Marte; Hansen, Kristian S

    2014-01-01

    in the national immunisation programme of a low-income country. Furthermore, the aim was to examine the relative contribution of different components to the total cost. METHODS: Following the World Health Organization guidelines, we estimated the resource use and costs associated with rotavirus vaccine......OBJECTIVES: Worldwide, rotavirus infections cause approximately 453,000 child deaths annually. Two licensed vaccines could be life- and cost-saving in low-income countries where the disease burden is highest. The aim of our study was to estimate the total cost of implementing the rotavirus vaccine...... implementation, using Malawi as a case. The cost analysis was undertaken from a governmental perspective. All costs were calculated for a 5-years period (2012-2016) and discounted at 5%. The value of key input parameters was varied in a sensitivity analysis. RESULTS: The total cost of rotavirus vaccine...

  16. Selection of emission factor standards for estimating emissions from diesel construction equipment in building construction in the Australian context.

    Science.gov (United States)

    Zhang, Guomin; Sandanayake, Malindu; Setunge, Sujeeva; Li, Chunqing; Fang, Jun

    2017-02-01

    Emissions from equipment usage and transportation at the construction stage are classified as the direct emissions which include both greenhouse gas (GHG) and non-GHG emissions due to partial combustion of fuel. Unavailability of a reliable and complete inventory restricts an accurate emission evaluation on construction work. The study attempts to review emission factor standards readily available worldwide for estimating emissions from construction equipment. Emission factors published by United States Environmental Protection Agency (US EPA), Australian National Greenhouse Accounts (AUS NGA), Intergovernmental Panel on Climate Change (IPCC) and European Environmental Agency (EEA) are critically reviewed to identify their strengths and weaknesses. A selection process based on the availability and applicability is then developed to help identify the most suitable emission factor standards for estimating emissions from construction equipment in the Australian context. A case study indicates that a fuel based emission factor is more suitable for GHG emission estimation and a time based emission factor is more appropriate for estimation of non-GHG emissions. However, the selection of emission factor standards also depends on factors like the place of analysis (country of origin), data availability and the scope of analysis. Therefore, suitable modifications and assumptions should be incorporated in order to represent these factors. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Estimation of Congestion Cost of Private Passenger Car Users in Malioboro, Yogyakarta

    Directory of Open Access Journals (Sweden)

    Sutomo H.

    2010-01-01

    Full Text Available Congestion is the condition when the hourly traffic demand exceeds the maximum sustainable hourly throughout of the link. The aim of this research is to estimate the congestion cost of private passenger car users in central business district along the corridor of Malioboro, Yogyakarta, Indonesia. The amount of the congestion cost is the difference between perceived and actual generalized cost in traffic jam condition. In this paper, only the congestion costs of private passenger car users are estimated, as they are expected to shift to buses. The generalized costs from origin zone i to destination zone j consist of vehicle operating cost, travel time cost, and pollution cost. This study shows that while the perceived generalized cost for private cars at Central Business District (CBD Malioboro is IDR 3101.00 per trip, the actual generalized cost in traffic jam condition is IDR 5802.00 per trip, giving the estimation of congestion cost in CBD Malioboro for private passenger car users as IDR 2701.00 per trip.

  18. Software Cost Estimation Model Based on Integration of Multi-agent and Case-Based Reasoning

    Directory of Open Access Journals (Sweden)

    Hasan Al-Sakran

    2006-01-01

    Full Text Available Accurate software cost estimation is a vital task that affects the firm's software investment decisions before committing required resources to that project or bidding for a contract. This study proposes an improved Case-Based Reasoning (CBR approach integrated with multi-agent technology to retrieve similar projects from multi-organizational distributed datasets. The study explores the possibility of building a software cost estimation model by collecting software cost data from distributed predefined project cost databases. The model applying CBR method to find similar projects in historical data derived from measured software projects developed by different organizations.

  19. An Evaluation of the Automated Cost Estimating Integrated Tools (ACEIT) System

    Science.gov (United States)

    1989-09-01

    C~4p DTIC S ELECTE fl JAN12 19 .1R ~OF S%. B -U AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Caroline L...Ohio go 91 022 AFIT/GCA/LSQ/89S-5 AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Caroline L. Hanson Major, USAF...Department of Defense. AFIT/GCA/LSQ/89S-5 AN EVALUATION OF THE AUTOMATED COST ESTIMATING INTEGRATED TOOLS ( ACEIT ) SYSTEM THESIS Presented to the

  20. Cost estimate of hospital stays for premature newborns in a public tertiary hospital in Brazil

    Directory of Open Access Journals (Sweden)

    Claudia Maria Desgualdo

    2011-01-01

    Full Text Available OBJECTIVES: To estimate the direct costs of hospital stays for premature newborns in the Interlagos Hospital and Maternity Center in São Paulo, Brazil and to assess the difference between the amount reimbursed to the hospital by the Unified Health System and the real cost of care for each premature newborn. METHODS: A cost-estimate study in which hospital and professional costs were estimated for premature infants born at 22 to 36 weeks gestation during the calendar year of 2004 and surviving beyond one hour of age. Direct costs included hospital services, professional care, diagnoses and therapy, orthotics, prosthetics, special materials, and blood products. Costs were estimated using tables published by the Unified Health System and the Brasindice as well as the list of medical procedures provided by the Brazilian Classification of Medical Procedures. RESULTS: The average direct cost of care for initial hospitalization of a premature newborn in 2004 was $2,386 USD. Total hospital expenses and professional services for all premature infants in this hospital were $227,000 and $69,500 USD, respectively. The costs for diagnostic testing and blood products for all premature infants totaled $22,440 and $1,833 USD. The daily average cost of a premature newborn weighing less than 1,000 g was $115 USD, and the daily average cost of a premature newborn weighing more than 2,500 g was $89 USD. Amounts reimbursed to the hospital by the Unified Health System corresponded to only 27.42% of the real cost of care. CONCLUSIONS: The cost of hospital stays for premature newborns was much greater than the amount reimbursed to the hospital by the Unified Health System. The highest costs corresponded to newborns with lower birth weight. Hospital costs progressively and discretely decreased as the newborns' weight increased.

  1. A Methodology for Software Cost Estimation Using Machine Learning Techniques

    Science.gov (United States)

    1993-09-03

    The correlation coefficient, R-squared, of 0.726 indicates that this estimate has a fairly strong relationship with the actual project effort. Why...networks could be considered truly accurate, the results of this experiment indicate that networks are worth strong consideration. The best indication that...ExpOneM 1.20 1.12 1.05 (B" ehm , 1981.P& 117) This comparison between the genetic algorithm derived values and Boehm’s values for the coefficients and

  2. Construction and Operation Costs of Wastewater Treatment and Implications for the Paper Industry in China.

    Science.gov (United States)

    Niu, Kunyu; Wu, Jian; Yu, Fang; Guo, Jingli

    2016-11-15

    This paper aims to develop a construction and operation cost model of wastewater treatment for the paper industry in China and explores the main factors that determine these costs. Previous models mainly involved factors relating to the treatment scale and efficiency of treatment facilities for deriving the cost function. We considered the factors more comprehensively by adding a regional variable to represent the economic development level, a corporate ownership factor to represent the plant characteristics, a subsector variable to capture pollutant characteristics, and a detailed-classification technology variable. We applied a unique data set from a national pollution source census for the model simulation. The major findings include the following: (1) Wastewater treatment costs in the paper industry are determined by scale, technology, degree of treatment, ownership, and regional factors; (2) Wastewater treatment costs show a large decreasing scale effect; (3) The current level of pollutant discharge fees is far lower than the marginal treatment costs for meeting the wastewater discharge standard. Key implications are as follows: (1) Cost characteristics and impact factors should be fully recognized when planning or making policies relating to wastewater treatment projects or technology development; (2) There is potential to reduce treatment costs by centralizing wastewater treatment via industrial parks; (3) Wastewater discharge fee rates should be increased; (4) Energy efficient technology should become the future focus of wastewater treatment.

  3. E-COCOMO: The Extended COst Constructive MOdel for Cleanroom Software Engineering

    Directory of Open Access Journals (Sweden)

    Hitesh KUMAR SHARMA

    2014-02-01

    Full Text Available Mistakes create rework. Rework takes time and increases costs. The traditional software engineering methodology defines the ratio of Design:Code:Test as 40:20:40. As we can easily see that 40% time and efforts are used in testing phase in traditional approach, that means we have to perform rework again if we found some bugs in testing phase. This rework is being performed after Design and code phase. This rework will increase the cost exponentially. The cleanroom software engineering methodology controls the exponential growth in cost by removing this rework. It says that "do the work correct in first attempt and move to next phase after getting the proof of correctness". This new approach minimized the rework and reduces the cost in the exponential ratio. Due to the removal of testing phase, the COCOMO (COst COnstructive MOdel used for the traditional engineering is not directly applicable in cleanroom software engineering. The traditional cost drivers used for traditional COCOMO needs to be revised. We have proposed the Extended version of COCOMO (i.e. E-COCOMO in which we have incorporated some new cost drivers. This paper explains the proposed E-COCOMO and the detailed description of proposed new cost driver.

  4. On Measurement of Avoidable and Unavoidable Cost of Alcohol: An Application of Method for Estimating Costs Due To Prior Consumption

    Science.gov (United States)

    Jarl, Johan; Gerdtham, Ulf-G; Ludbrook, Anne; Petrie, Dennis

    2010-01-01

    This study estimates the avoidable and unavoidable costs of alcohol-related, liver cirrhosis inpatient care, controlling for the lag structure and period of decline in disease risk. Lag structures with different lengths are applied to the exposure to risk from alcohol consumption, which allows for differentiation between avoidable and unavoidable cases due to prior consumption. A lag length of 20 (men) and 23 (women) years (expected remaining life years) gives a total cost of 592 million SEK. Given alcohol consumption is reduced to zero, 72% of cost could potentially be avoided. It is important to account for the length and structure of the risk decline following a consumption change as this substantially affects the estimates. PMID:20717547

  5. How much do disasters cost? A comparison of disaster cost estimates in Australia

    Science.gov (United States)

    Ladds, Monique; Keating, Adriana; Handmer, John; Magee, Liam

    2017-04-01

    Extreme weather events in Australia are common and a large proportion of the population are exposed to such events. Therefore, there is great interest as to how these events will impact Australia's society and economy, which requires understanding the current and historical impact of disasters. Despite global efforts to record and cost disaster impacts, no standardised method of collecting and recording data retrospectively yet exists. The lack of comparability in turn produces quite different analyses of economic impacts. This paper examines five examples of aggregate cost and relative impacts of natural disasters in Australia, and comparisons between them reveal significant data shortcomings. The reliability of data sources, and the methodology employed to analyse them can have significant impacts on conclusions regarding the overall cost of disasters, the relative costs of different disaster types, and the distribution of costs across Australian states. We highlight difficulties with time series comparisons, further complicated by the interdependencies of the databases. We reiterate the need for consistent and comparable data collection and analysis, to respond to the increasing frequency and severity of disasters in Australia.

  6. Estimating the costs of induced abortion in Uganda: a model-based analysis.

    Science.gov (United States)

    Babigumira, Joseph B; Stergachis, Andy; Veenstra, David L; Gardner, Jacqueline S; Ngonzi, Joseph; Mukasa-Kivunike, Peter; Garrison, Louis P

    2011-12-06

    The demand for induced abortions in Uganda is high despite legal and moral proscriptions. Abortion seekers usually go to illegal, hidden clinics where procedures are performed in unhygienic environments by under-trained practitioners. These abortions, which are usually unsafe, lead to a high rate of severe complications and use of substantial, scarce healthcare resources. This study was performed to estimate the costs associated with induced abortions in Uganda. A decision tree was developed to represent the consequences of induced abortion and estimate the costs of an average case. Data were obtained from a primary chart abstraction study, an on-going prospective study, and the published literature. Societal costs, direct medical costs, direct non-medical costs, indirect (productivity) costs, costs to patients, and costs to the government were estimated. Monte Carlo simulation was used to account for uncertainty. The average societal cost per induced abortion (95% credibility range) was $177 ($140-$223). This is equivalent to $64 million in annual national costs. Of this, the average direct medical cost was $65 ($49-86) and the average direct non-medical cost was $19 ($16-$23). The average indirect cost was $92 ($57-$139). Patients incurred $62 ($46-$83) on average while government incurred $14 ($10-$20) on average. Induced abortions are associated with substantial costs in Uganda and patients incur the bulk of the healthcare costs. This reinforces the case made by other researchers--that efforts by the government to reduce unsafe abortions by increasing contraceptive coverage or providing safe, legal abortions are critical.

  7. Estimating the costs of induced abortion in Uganda: A model-based analysis

    Science.gov (United States)

    2011-01-01

    Background The demand for induced abortions in Uganda is high despite legal and moral proscriptions. Abortion seekers usually go to illegal, hidden clinics where procedures are performed in unhygienic environments by under-trained practitioners. These abortions, which are usually unsafe, lead to a high rate of severe complications and use of substantial, scarce healthcare resources. This study was performed to estimate the costs associated with induced abortions in Uganda. Methods A decision tree was developed to represent the consequences of induced abortion and estimate the costs of an average case. Data were obtained from a primary chart abstraction study, an on-going prospective study, and the published literature. Societal costs, direct medical costs, direct non-medical costs, indirect (productivity) costs, costs to patients, and costs to the government were estimated. Monte Carlo simulation was used to account for uncertainty. Results The average societal cost per induced abortion (95% credibility range) was $177 ($140-$223). This is equivalent to $64 million in annual national costs. Of this, the average direct medical cost was $65 ($49-86) and the average direct non-medical cost was $19 ($16-$23). The average indirect cost was $92 ($57-$139). Patients incurred $62 ($46-$83) on average while government incurred $14 ($10-$20) on average. Conclusion Induced abortions are associated with substantial costs in Uganda and patients incur the bulk of the healthcare costs. This reinforces the case made by other researchers--that efforts by the government to reduce unsafe abortions by increasing contraceptive coverage or providing safe, legal abortions are critical. PMID:22145859

  8. Estimating the economic costs of skin cancer in New South Wales, Australia.

    Science.gov (United States)

    Doran, Christopher M; Ling, Rod; Byrnes, Joshua; Crane, Melanie; Searles, Andrew; Perez, Donna; Shakeshaft, Anthony

    2015-09-23

    Skin cancer is one of the most common cancers in the world. The increased incidence of skin cancer, combined with limited health care resources and tight budgetary conditions, has increased the importance of understanding the economic impact of skin cancer. This research estimates the economic cost of skin cancer in the Australian state of New South Wales. An incidence based approach is used to estimate lifetime costs of skin cancer. Both direct and indirect costs are considered - direct costs include resources associated with the management of skin cancer and indirect costs refer to productivity costs associated with morbidity and premature mortality. Diagnosis of skin cancer was determined according to ICD-10 codes using principal diagnosis. Linked administrative data and regression modelling are used to calculate costs; presented as Australian dollars for the year 2010. The human capital approach is used to value present and future productivity losses. The lifetime cost of the 150,000 incident cases of skin cancer diagnosed in NSW in 2010 is estimated at $536 million ($44,796 per melanoma and $2459 per non-melanoma). Direct costs accounted for 72 % of costs ($10,230 per melanoma and $2336 per non-melanoma) and indirect costs accounted for 28 % of costs ($34,567 per melanoma and $123 per non-melanoma). Direct costs are, on average, higher for females than males with indirect costs, on average, higher for males than females. This research provides new evidence on the economic cost of skin cancer and provides policy makers with information of the potential monetary savings that may arise from efforts to reduce the incidence of skin cancer.

  9. The social cost of rheumatoid arthritis in Italy: the results of an estimation exercise.

    Science.gov (United States)

    Turchetti, G; Bellelli, S; Mosca, M

    2014-03-14

    The objective of this study is to estimate the mean annual social cost per adult person and the total social cost of rheumatoid arthritis (RA) in Italy. A literature review was performed by searching primary economic studies on adults in order to collect cost data of RA in Italy in the last decade. The review results were merged with data of institutional sources for estimating - following the methodological steps of the cost of illness analysis - the social cost of RA in Italy. The mean annual social cost of RA was € 13,595 per adult patient in Italy. Affecting 259,795 persons, RA determines a social cost of € 3.5 billions in Italy. Non-medical direct cost and indirect cost represent the main cost items (48% and 31%) of the total social cost of RA in Italy. Based on these results, it appears evident that the assessment of the economic burden of RA solely based on direct medical costs evaluation gives a limited view of the phenomenon.

  10. The social cost of rheumatoid arthritis in Italy: the results of an estimation exercise

    Directory of Open Access Journals (Sweden)

    G. Turchetti

    2014-03-01

    Full Text Available The objective of this study is to estimate the mean annual social cost per adult person and the total social cost of rheumatoid arthritis (RA in Italy. A literature review was performed by searching primary economic studies on adults in order to collect cost data of RA in Italy in the last decade. The review results were merged with data of institutional sources for estimating - following the methodological steps of the cost of illness analysis - the social cost of RA in Italy. The mean annual social cost of RA was € 13,595 per adult patient in Italy. Affecting 259,795 persons, RA determines a social cost of € 3.5 billions in Italy. Non-medical direct cost and indirect cost represent the main cost items (48% and 31% of the total social cost of RA in Italy. Based on these results, it appears evident that the assessment of the economic burden of RA solely based on direct medical costs evaluation gives a limited view of the phenomenon.

  11. ANALYSIS OF THE INCREASE OF CONSTRUCTION COSTS IN URBAN REGENERATION PROJECTS

    Directory of Open Access Journals (Sweden)

    Magdalena Apollo

    2015-11-01

    Full Text Available The subject of this paper is the analysis and evaluation of the reasons for construction costs increases in urban regeneration projects. The analysis considers major refurbishments of real estates’, as well as heavy repair and modernization of the road system. For the period mentioned, the costs from works and expenditure schedules were compared with the costs of additional works, which shows the percentage cost increase in relation to initial project budget assumptions of the case study. The analysis revealed that due to difficulties in assessing technical state of inhabited buildings, the investor and potential contractor should pay special attention to the character of issues presented in this paper, taking into account an increased risk of their occurrence.

  12. Parametric study of the cost estimate for radio frequency system of compact linear collider

    CERN Document Server

    Nummela, Antti; Österberg, Kenneth

    In this thesis the cost of so called RF units of CLIC particle collider was examined when RF units’ configuration was considered to be lengthened according to several alternative scenarios. According to current estimates these structures correspond to approximately 20 % of the total cost of CLIC collider and as such the savings achieved in their cost could be significant when total cost of CLIC project is looked into. The unit cost of longer RF units would be greater when compared to the baseline scenario but as smaller quantity would be required cost savings might be achieved. The aim was to find out if cost savings would accumulate and if so, how significant these savings might be. Research material used was mainly internal CERN resources such as earlier cost estimates and tenders received from the industry for production of different components. Based on these cost estimate models were created for three different configurations for lengthening the RF units. The research was limited to the cost of RF unit...

  13. Cost management as basis of harmonious approaches to the development of the construction business

    Directory of Open Access Journals (Sweden)

    Matveev Nikita Mikhaylovich

    2016-11-01

    Full Text Available The management of construction companies’ development is rarely aimed at harmonization of business and at the development of the ways of its sustainable development. Case studies and the application scope for harmonization as an approach allowing systematic and balanced development of business showed its practical relevance. The use of this approach allows not only correlating the objectives, clarifying the mission, structuring the problems, or determining the optimal salary of employees, but also correlating the costs to each other, which is particularly important in light of the need for rapid transformation of the building production methods. They are based on competent use of system properties of the systems. The properties of emergence, resonance, measurability, and others are of particular importance. Their accounting allows achieving the optimal cost outlay required in the process of investment and construction activities. It complies with the requirements and conditions of the market economy. The mentioned advantages of the use of harmonization technologies to ensure the stability and sustainability of investment and construction activities enable to confirm the hypothesis of the impossibility to achieve the optimum cost, for example, for the implementation of an investment and construction project without implementation of the system properties of a harmonious approach.

  14. Construction Costs Assessment of Structural Systems for Low-Rise and Social Welfare Housing

    Directory of Open Access Journals (Sweden)

    Carrillo Julián

    2015-09-01

    Full Text Available A comparative analysis of the costs related to the construction of low-rise, low-cost and social welfare housing was carried out. The study included three of the most commonly used structural systems for low-rise housing in Latin America, such as the traditional system of confined masonry walls, concrete walls conventionally reinforced with welded-wire meshes and concrete walls reinforced with steel fiber. The cost comparison was carried out by budgets analysis, which were performed based on construction quantities, unit prices and particular items for each structural system. It was found in the study that, from an economic point of view, the systems of concrete walls reinforced with welded-wire meshes or steel fibers are more advantageous than confined masonry systems. In addition, the integral comparison of the three structural systems demonstrates that the industrialized system of steel fiber reinforced concrete walls allows obtaining greater advantages of cleaning and sustainability, faster construction, lower cost and a more attractive scenario for builders investing in such projects.

  15. Novel solar tower structure to lower plant cost and construction risk

    Science.gov (United States)

    Peterseim, J. H.; White, S.; Hellwig, U.

    2016-05-01

    In recent times the interest in solar tower power plants is increasing with various plants being built in the last years and currently under construction, e.g. Ivanpah and Crescent Dunes in the US and Khi Solar One in South Africa. The higher cycle efficiency leads to lower levelised cost of electricity. However, further cost reductions are required and this paper compares a novel and patented solar tower structure with a conventional concrete tower. The novel solar tower design is cable-stayed which has the benefit that the cables absorb a large part of the wind and buckling loads. A tower that has to cope with fewer wind and buckling forces can have a significantly smaller diameter than a concrete tower, which enables workshop manufacture, sea and road transport, and rapid on-site installation. The case study provided in this paper finds that the tower area affected by wind can be reduced by up to 45%, installation time shortened by up to 66%, and tower cost by 20-40%. The novel design allows the construction and transport of the solar tower in few large modules, which are pre-manufactured including piping, cables, platform, ladders etc. The few modules can be assembled and installed rapidly not only lowering plant cost and construction time but also project risk.

  16. Technology Cost and Schedule Estimation (TCASE) Final Report

    Science.gov (United States)

    Wallace, Jon; Schaffer, Mark

    2015-01-01

    During the 2014-2015 project year, the focus of the TCASE project has shifted from collection of historical data from many sources to securing a data pipeline between TCASE and NASA's widely used TechPort system. TCASE v1.0 implements a data import solution that was achievable within the project scope, while still providing the basis for a long-term ability to keep TCASE in sync with TechPort. Conclusion: TCASE data quantity is adequate and the established data pipeline will enable future growth. Data quality is now highly dependent the quality of data in TechPort. Recommendation: Technology development organizations within NASA should continue to work closely with project/program data tracking and archiving efforts (e.g. TechPort) to ensure that the right data is being captured at the appropriate quality level. TCASE would greatly benefit, for example, if project cost/budget information was included in TechPort in the future.

  17. Twice-weighted multiple interval estimation of a marginal structural model to analyze cost-effectiveness.

    Science.gov (United States)

    Goldfeld, K S

    2014-03-30

    Cost-effectiveness analysis is an important tool that can be applied to the evaluation of a health treatment or policy. When the observed costs and outcomes result from a nonrandomized treatment, making causal inference about the effects of the treatment requires special care. The challenges are compounded when the observation period is truncated for some of the study subjects. This paper presents a method of unbiased estimation of cost-effectiveness using observational study data that is not fully observed. The method-twice-weighted multiple interval estimation of a marginal structural model-was developed in order to analyze the cost-effectiveness of treatment protocols for advanced dementia residents living nursing homes when they become acutely ill. A key feature of this estimation approach is that it facilitates a sensitivity analysis that identifies the potential effects of unmeasured confounding on the conclusions concerning cost-effectiveness.

  18. Estimating the indirect costs associated with the expected number of cancer cases in Mexico by 2020.

    Science.gov (United States)

    Gutiérrez-Delgado, Cristina; Armas-Texta, Daniel; Reynoso-Noverón, Nancy; Meneses-García, Abelardo; Mohar-Betancourt, Alejandro

    2016-04-01

    To estimate the indirect costs generated by adults with cancer in Mexico from 2002-2020. Using information from national sources and the national cancer incidence from GLOBOCAN, we estimated income lost due to premature death (ILPD), short-term benefits (STBs), disability pensions (DPs), and opportunity costs for the carer (OCCs) generated by patients with cancer. Amounts were reported in Mexican pesos. We estimated 23 359 deaths and 216 679 new cases of cancer by 2020, which would be associated with a total indirect cost of 20.15 billion Mexican pesos. Men are expected to generate 54.9% of these costs. ILPD is expected to comprise the highest percentage of the cost (60%), followed by OCCs (22%), STBs (17%) and DPs (1%). From an economic perspective, the results emphasize the need to strengthen preventive interventions and early detection of cancer among adults to reduce its effect on the productivity of Mexico.

  19. Statistical estimation of service cracks and maintenance cost for aircraft structures

    Science.gov (United States)

    Yang, J.-N.

    1975-01-01

    A method is developed for the statistical estimation of the number of cracks to be repaired in service as well as the repair and the maintenance costs. The present approach accounts for the statistical distribution of the initial crack size, the statistical nature of the NDI technique used for detecting the crack, and the renewal process for the crack propagation of repaired cracks. The mean and the standard deviation of the cumulative number of cracks to be repaired are computed as a function of service time. The statistics of the costs of repair and maintenance, expressed in terms of the percentage of the cost of replacement, are estimated as a function of service time. The results of the present study provide relevant information for the decision of fleet management, the estimation of life cycle cost, and procurement specifications. The present study is essential to the design and cost optimization of aircraft structures.

  20. Selection of relevant items for decommissioning costing estimation of a PWR using fuzzy logic

    Energy Technology Data Exchange (ETDEWEB)

    Monteiro, Deiglys Borges; Busse, Alexander Lucas; Moreira, Joao M.L.; Maiorino, Jose Rubens, E-mail: deiglys.monteiro@ufabc.edu.br, E-mail: alexlucasb@gmail.com, E-mail: joao.moreira@ufabc.edu.br, E-mail: joserubens.maiorino@ufabc.edu.br [Universidade Federal do ABC (CECS/UFABC), Santo Andre, SP (Brazil). Centro de Engenharia, Modelagem e Ciencias Aplicadas. Programa de Pos-Graduacao em Energia e Engenharia da Energia

    2015-07-01

    The decommissioning is an important part of a nuclear power plant life cycle which may occur by technical, economical or safety reasons. Decommissioning requires carrying out a large number of tasks that should be planned in advance, involves cost evaluations, preparation of plans of activity and actual operational actions. Despite the large number of tasks, only part of them is relevant for cost estimation purpose. The technical literature and international regulatory agencies suggest a variety of methods for decommissioning cost estimation. Most of them require a very detailed knowledge of the plant and data available suitable for plants that are starting their decommissioning but not for those in the planning stage. The present work aims to apply fuzzy logic to sort out relevant items to cost estimation in order to reduce the work effort involved. The scheme uses parametric equations for specific cost items, and is applied to specific parts of the process of nuclear power plant decommissioning. (author)

  1. F-35 Sustainment: Need for Affordable Strategy, Greater Attention to Risks, and Improved Cost Estimates

    Science.gov (United States)

    2014-09-01

    F - 35 SUSTAINMENT Need for Affordable Strategy, Greater Attention to Risks, and Improved Cost Estimates Report...2. REPORT TYPE 3. DATES COVERED 00-00-2014 to 00-00-2014 4. TITLE AND SUBTITLE F - 35 Sustainment: Need for Affordable Strategy, Greater...House of Representatives September 2014 F - 35 SUSTAINMENT Need for Affordable Strategy, Greater Attention to Risks, and Improved Cost Estimates Why

  2. Why don't All Exporters Benefit from Free Trade Agreements?: Estimating Utilization Costs

    OpenAIRE

    Ulloa, Alfie; Wagner, Rodrigo

    2012-01-01

    Free Trade Agreements (FTA) attract significant interest, but after these treaties are signed not all exporters use them. We provide a model of heterogeneous utilization, also developing a novel method to estimate treaty-utilization costs. We later apply the model to estimate the evolution utilization costs for the FTA between the US and a small open economy, Chile. Consistent with other studies, we find that utilization is indeed partial (on average 67% on the first year of the treaty, with ...

  3. Using the Black Scholes method for estimating high cost illness insurance premiums in Colombia

    Directory of Open Access Journals (Sweden)

    Liliana Chicaíza

    2009-04-01

    Full Text Available This article applied the Black-Scholes option valuation formula to calculating high-cost illness reinsurance premiums in the Colombian health system. The coverage pattern used in reinsuring high-cost illnesses was replicated by means of a European call option contract. The option’s relevant variables and parameters were adapted to an insurance market context. The premium estimated by the BlackScholes method fell within the range of premiums estimated by the actuarial method.

  4. Estimating the employment and earnings costs of mental illness: recent developments in the United States.

    Science.gov (United States)

    Marcotte, D E; Wilcox-Gök, V

    2001-07-01

    Substantial attention has recently been focused on both the prevalence and consequences of mental illness. Generally, public interest in the costs of mental illness has been limited to the direct costs of treating the mentally ill. In this paper, we consider the magnitude and importance of a major component of the indirect costs of mental illness: employment and earnings losses. We first describe the technical difficulties involved in estimating these costs. We then describe new data and recent advances in the United States that have improved our ability to make such estimates. Our conclusions from the recent research are that each year in the United States 5-6 million workers between the ages of 16 and 54 lose, fail to seek, or cannot find employment as a consequence of mental illness. Among those who do work, we estimate that mental illness decreases annual income by an amount between $3,500 and $6,000. We then discuss an emerging challenge to the traditional method for arriving at such estimates: the friction cost approach. We describe both the conceptual and technical differences between the friction cost method and the traditional human capital approach. We conclude that while economic context has much to do with whether one relies on human capital or friction cost estimates, each can offer useful information about labor market losses due to mental illness.

  5. The cost of crime to society: new crime-specific estimates for policy and program evaluation.

    Science.gov (United States)

    McCollister, Kathryn E; French, Michael T; Fang, Hai

    2010-04-01

    Estimating the cost to society of individual crimes is essential to the economic evaluation of many social programs, such as substance abuse treatment and community policing. A review of the crime-costing literature reveals multiple sources, including published articles and government reports, which collectively represent the alternative approaches for estimating the economic losses associated with criminal activity. Many of these sources are based upon data that are more than 10 years old, indicating a need for updated figures. This study presents a comprehensive methodology for calculating the cost to society of various criminal acts. Tangible and intangible losses are estimated using the most current data available. The selected approach, which incorporates both the cost-of-illness and the jury compensation methods, yields cost estimates for more than a dozen major crime categories, including several categories not found in previous studies. Updated crime cost estimates can help government agencies and other organizations execute more prudent policy evaluations, particularly benefit-cost analyses of substance abuse treatment or other interventions that reduce crime.

  6. Double robust estimator of average causal treatment effect for censored medical cost data.

    Science.gov (United States)

    Wang, Xuan; Beste, Lauren A; Maier, Marissa M; Zhou, Xiao-Hua

    2016-08-15

    In observational studies, estimation of average causal treatment effect on a patient's response should adjust for confounders that are associated with both treatment exposure and response. In addition, the response, such as medical cost, may have incomplete follow-up. In this article, a double robust estimator is proposed for average causal treatment effect for right censored medical cost data. The estimator is double robust in the sense that it remains consistent when either the model for the treatment assignment or the regression model for the response is correctly specified. Double robust estimators increase the likelihood the results will represent a valid inference. Asymptotic normality is obtained for the proposed estimator, and an estimator for the asymptotic variance is also derived. Simulation studies show good finite sample performance of the proposed estimator and a real data analysis using the proposed method is provided as illustration. Copyright © 2016 John Wiley & Sons, Ltd.

  7. Cost-effectiveness estimates for antenatal HIV testing in the Netherlands.

    NARCIS (Netherlands)

    Rozenbaum, M.H.; Verweel, G.; Folkerts, D.K.; Dronkers, F.; Hoek, JA van den; Hartwig, N.G.; Groot, R. de; Postma, M.J.

    2008-01-01

    This paper provides an estimation of the lifetime health-care cost of HIV-infected children and an update of the cost-effectiveness of universal HIV-screening of pregnant women in Amsterdam (The Netherlands). During 2003-2005, we collected data concerning the prevalence of newly diagnosed HIV-infect

  8. Estimating the costs of reducing CO2 emission via avoided deforestation with integrated assessment modelling

    NARCIS (Netherlands)

    Overmars, K.P.; Tabeau, A.A.; Stehfest, E.; Meijl, van J.C.M.

    2012-01-01

    Estimates for deforestation and forest degradation were shown to account for about 17% of greenhouse gas emissions. The implementation of REDD is suggested to provide substantial emission reductions at low costs. Proper calculation of such a costs requires integrated modeling approach involving biop

  9. How Much Does Intellectual Disability Really Cost? First Estimates for Australia

    Science.gov (United States)

    Doran, Christopher M.; Einfeld, Stewart L.; Madden, Rosamond H.; Otim, Michael; Horstead, Sian K.; Ellis, Louise A.; Emerson, Eric

    2012-01-01

    Background: Given the paucity of relevant data, this study estimates the cost of intellectual disability (ID) to families and the government in Australia. Method: Family costs were collected via the Client Service Receipt Inventory, recording information relating to service use and personal expense as a consequence of ID. Government expenditure on…

  10. Preconception care: preliminary estimates of costs and effects of smoking cessation and folic acid supplementation.

    NARCIS (Netherlands)

    Weerd, S. de; Polder, J.J.; Cohen-Overbeek, T.E.; Zimmermann, L.J.; Steegers, E.A.P.

    2004-01-01

    OBJECTIVE: To assess costs and effectiveness of preconception counseling for all women planning pregnancy in The Netherlands with regard to folic acid supplementation and smoking cessation counseling. STUDY DESIGN: Costs and effects were estimated based on 200,000 women approached yearly and uptake

  11. The Effect of Infrastructure Sharing in Estimating Operations Cost of Future Space Transportation Systems

    Science.gov (United States)

    Sundaram, Meenakshi

    2005-01-01

    NASA and the aerospace industry are extremely serious about reducing the cost and improving the performance of launch vehicles both manned or unmanned. In the aerospace industry, sharing infrastructure for manufacturing more than one type spacecraft is becoming a trend to achieve economy of scale. An example is the Boeing Decatur facility where both Delta II and Delta IV launch vehicles are made. The author is not sure how Boeing estimates the costs of each spacecraft made in the same facility. Regardless of how a contractor estimates the cost, NASA in its popular cost estimating tool, NASA Air force Cost Modeling (NAFCOM) has to have a method built in to account for the effect of infrastructure sharing. Since there is no provision in the most recent version of NAFCOM2002 to take care of this, it has been found by the Engineering Cost Community at MSFC that the tool overestimates the manufacturing cost by as much as 30%. Therefore, the objective of this study is to develop a methodology to assess the impact of infrastructure sharing so that better operations cost estimates may be made.

  12. Cost-effectiveness estimates for antenatal HIV testing in the Netherlands

    NARCIS (Netherlands)

    Rozenbaum, M.H.; Verweel, G.; Folkerts, D.K.F.; Dronkers, F.; van den Hoek, J.A.R.; Hartwig, N.G.; de Groot, R.; Postma, M.J.

    2008-01-01

    This paper provides an estimation of the lifetime health-care cost of HIV-infected children and an update of the cost-effectiveness of universal HIV-screening of pregnant women in Amsterdam (The Netherlands). During 2003-2005, we collected data concerning the prevalence of newly diagnosed HIV-infect

  13. Cost-effectiveness estimates for antenatal HIV testing in the Netherlands.

    NARCIS (Netherlands)

    Rozenbaum, M.H.; Verweel, G.; Folkerts, D.K.; Dronkers, F.; Hoek, JA van den; Hartwig, N.G.; Groot, R. de; Postma, M.J.

    2008-01-01

    This paper provides an estimation of the lifetime health-care cost of HIV-infected children and an update of the cost-effectiveness of universal HIV-screening of pregnant women in Amsterdam (The Netherlands). During 2003-2005, we collected data concerning the prevalence of newly diagnosed HIV-infect

  14. Two Computer Programs for Equipment Cost Estimation and Economic Evaluation of Chemical Processes.

    Science.gov (United States)

    Kuri, Carlos J.; Corripio, Armando B.

    1984-01-01

    Describes two computer programs for use in process design courses: an easy-to-use equipment cost estimation program based on latest cost correlations available and an economic evaluation program which calculates two profitability indices. Comparisons between programed and hand-calculated results are included. (JM)

  15. Simple calculator to estimate the medical cost of diabetes in sub-Saharan Africa

    Institute of Scientific and Technical Information of China (English)

    Koffi; Alouki; Hélène; Delisle; Stéphane; Besan?on; Naby; Baldé; Assa; Sidibé-Traoré; Joseph; Drabo; Fran?ois; Djrolo; Jean-Claude; Mbanya; Serge; Halimi

    2015-01-01

    AIM: To design a medical cost calculator and show that diabetes care is beyond reach of the majority particularlypatients with complications.METHODS: Out-of-pocket expenditures of patients for medical treatment of type-2 diabetes were estimated based on price data collected in Benin,Burkina Faso,Guinea and Mali. A detailed protocol for realistic medical care of diabetes and its complications in the African context was defined. Care components were based on existing guidelines,published data and clinical experience. Prices were obtained in public and private health facilities. The cost calculator used Excel. The cost for basic management of uncomplicated diabetes was calculated per person and per year. Incremental costs were also computed per annum for chronic complications and per episode for acute complications. RESULTS: Wide variations of estimated care costs were observed among countries and between the public and private healthcare system. The minimum estimated cost for the treatment of uncomplicated diabetes(in the public sector) would amount to 21%-34% of the country’s gross national income per capita,26%-47% in the presence of retinopathy,and above 70% for nephropathy,the most expensive complication. CONCLUSION: The study provided objective evidence for the exorbitant medical cost of diabetes considering that no medical insurance is available in the study countries. Although the calculator only estimates the cost of inaction,it is innovative and of interest for several stakeholders.

  16. Southeast Alaska intertie dc transmission system: reconnaissance design and cost estimate. Appendix I

    Energy Technology Data Exchange (ETDEWEB)

    1982-11-01

    The detailed costs of the schemes are given in this Appendix. The conceptual designs of the sea electrodes for the schemes are also described. The cost estimates for the electrodes were based on these conceptual designs. A cost comparison of ac and dc transmission for 10 MW from Ketchikan to Tolstoi Bay is given along with an example outlining the procedure for selecting the optimum dc cable size.

  17. Design and Construction of Low Cost High Voltage dc Power Supply for Constant Power Operation

    Science.gov (United States)

    Kumar, N. S.; Jayasankar, V.

    2013-06-01

    Pulsed load applications like laser based systems need high voltage dc power supplies with better regulation characteristics. This paper presents the design, construction and testing of dc power supply with 1 kV output at 300 W power level. The designed converter has half bridge switched mode power supply (SMPS) configuration with 20 kHz switching. The paper covers the design of half bridge inverter, closed loop control, High frequency transformer and other related electronics. The designed power supply incorporates a low cost OPAMP based feedback controller which is designed using small signal modelling of the converter. The designed converter was constructed and found to work satisfactorily as per the specifications.

  18. Generation IV Nuclear Energy Systems Construction Cost Reductions Through the Use of Virtual Environments

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Vaugh Whisker

    2004-02-28

    The objective of this multi-phase project is to demonstrate the feasibility and effectiveness of using full-scale virtual reality simulation in the design, construction, and maintenance of future nuclear power plants. The project will test the suitability of immersive virtual reality technology to aid engineers in the design of the next generation nuclear power plant and to evaluate potential cost reductions that can be realized by optimization of installation and construction sequences. The intent is to see if this type of information technology can be used in capacities similar to those currently filled by full-scale physical mockups. This report presents the results of the completed project.

  19. IMPACT OF FINANCIAL CRISIS ON CONSTRUCTION FIRM`S COST OF CAPITAL

    Directory of Open Access Journals (Sweden)

    Schiau (Macavei Laura Liana

    2010-12-01

    Full Text Available The average cost of debt is negatively related with size, tangibility, firm growth, the leverage ratio, and the ratio of long- to short-term debt and positively to profitability. We find that the recent international crisis did have a significant impact on the set of firms in our sample, but affected the way in which leverage and the interest to debt ratio relate to firm fundamentals. In this article, we want to study the impact of financial crisis on the cost of capital using a sample of construction companies.

  20. Costing support and cost control in manufacturing. A cost estimation tool applied in the sheet metal domain.

    NARCIS (Netherlands)

    Brinke, ten Erik

    2002-01-01

    In the product development cycle several engineering tasks like design, process planning and production planning have to be executed. The execution of these tasks mainly involves information processing and decision-making. Because costs is an important factor in manufacturing, adequate information a

  1. Costing support and cost control in manufacturing. A cost estimation tool applied in the sheet metal domain.

    NARCIS (Netherlands)

    ten Brinke, E.

    2002-01-01

    In the product development cycle several engineering tasks like design, process planning and production planning have to be executed. The execution of these tasks mainly involves information processing and decision-making. Because costs is an important factor in manufacturing, adequate information

  2. Proportioning of Steel Fibre Reinforced Concrete Mixes for Pavement Construction and Their Impact on Environment and Cost

    Directory of Open Access Journals (Sweden)

    Stelios Kallis

    2011-07-01

    Full Text Available Steel fibre reinforced concrete (SFRC is a construction material investigated for more than 40 years including for pavement applications. A number of studies have demonstrated the technical merits of SFRC pavements over conventional concrete pavements; however little work has been carried out on the environmental and economical impact of SFRC during the pavement’s life cycle. Therefore, extended research was undertaken within the framework of the EU funded project “EcoLanes” to estimate the environmental and economical loadings of SFRC pavements. The innovative concept of the project is the use of recycled steel tyre-cord wire as concrete fibre reinforcement, which provides additional environmental benefits for tyre recycling over landfilling. Within the project framework a demonstration of a steel-fibre-reinforced roller-compacted concrete (SFR-RCC pavement was constructed in a rural area in Cyprus. In order to assess the economical and environmental picture of the demonstration pavement, life cycle cost analysis (LCCA and life cycle assessment (LCA studies were undertaken, which also compared the under study pavement design with four conventional alternatives. The main output of the studies is that SFR-RCC is more environmentally and economically sustainable than others. In addition, various concrete mix designs were investigated by considering parameters such as fibre type and dosage, cement type, and transportation distances to the construction site. Fibre dosage has been highlighted as a crucial factor compared with economical and environmental loadings in SFR-RCC pavement construction.

  3. Cost estimation for solid waste management in industrialising regions--precedents, problems and prospects.

    Science.gov (United States)

    Parthan, Shantha R; Milke, Mark W; Wilson, David C; Cocks, John H

    2012-03-01

    The importance of cost planning for solid waste management (SWM) in industrialising regions (IR) is not well recognised. The approaches used to estimate costs of SWM can broadly be classified into three categories - the unit cost method, benchmarking techniques and developing cost models using sub-approaches such as cost and production function analysis. These methods have been developed into computer programmes with varying functionality and utility. IR mostly use the unit cost and benchmarking approach to estimate their SWM costs. The models for cost estimation, on the other hand, are used at times in industrialised countries, but not in IR. Taken together, these approaches could be viewed as precedents that can be modified appropriately to suit waste management systems in IR. The main challenges (or problems) one might face while attempting to do so are a lack of cost data, and a lack of quality for what data do exist. There are practical benefits to planners in IR where solid waste problems are critical and budgets are limited.

  4. Estimating the cost of treating patients with liver cirrhosis at the Mexican Social Security Institute.

    Science.gov (United States)

    Quiroz, María Esther; Flores, Yvonne N; Aracena, Belkis; Granados-García, Víctor; Salmerón, Jorge; Pérez, Ruth; Cabrera, Guillermo; Bastani, Roshan

    2010-01-01

    To estimate the annual cost of treating patients with cirrhosis at the Mexican Institute of Social Security (IMSS per its abbreviation in Spanish). The annual cost of treating three stages of cirrhosis (Child-Pugh A, Child-Pugh B and Child-Pugh C) was estimated using micro-costing techniques and medical experts. These results were compared and contrasted with prices reported by IMSS. The annual cost of treatment, in USA dollars, by Child-Pugh stage was: a) micro-costing results: $1110.17 stage A, $549.55 stage B and $348.16 stage C; b) opinion of medical experts: $1 633.64, $6564.04 and $19660.35, respectively; and c) IMSS costs: $4269.00, $16949.63 and $30249.25, respectively. The cost of treating patients with cirrhosis is considerable, and costs increase as the disease worsens. Cost estimates vary depending on the source of information, and the methodology used. There are discrepancies between the procedures reported in medical records and treatment recommendations by IMSS liver experts.

  5. The cost of universal health care in India: a model based estimate.

    Directory of Open Access Journals (Sweden)

    Shankar Prinja

    Full Text Available INTRODUCTION: As high out-of-pocket healthcare expenses pose heavy financial burden on the families, Government of India is considering a variety of financing and delivery options to universalize health care services. Hence, an estimate of the cost of delivering universal health care services is needed. METHODS: We developed a model to estimate recurrent and annual costs for providing health services through a mix of public and private providers in Chandigarh located in northern India. Necessary health services required to deliver good quality care were defined by the Indian Public Health Standards. National Sample Survey data was utilized to estimate disease burden. In addition, morbidity and treatment data was collected from two secondary and two tertiary care hospitals. The unit cost of treatment was estimated from the published literature. For diseases where data on treatment cost was not available, we collected data on standard treatment protocols and cost of care from local health providers. RESULTS: We estimate that the cost of universal health care delivery through the existing mix of public and private health institutions would be INR 1713 (USD 38, 95%CI USD 18-73 per person per annum in India. This cost would be 24% higher, if branded drugs are used. Extrapolation of these costs to entire country indicates that Indian government needs to spend 3.8% (2.1%-6.8% of the GDP for universalizing health care services. CONCLUSION: The cost of universal health care delivered through a combination of public and private providers is estimated to be INR 1713 per capita per year in India. Important issues such as delivery strategy for ensuring quality, reducing inequities in access, and managing the growth of health care demand need be explored.

  6. Cost-Sharing of Ecological Construction Based on Trapezoidal Intuitionistic Fuzzy Cooperative Games.

    Science.gov (United States)

    Liu, Jiacai; Zhao, Wenjian

    2016-11-08

    There exist some fuzziness and uncertainty in the process of ecological construction. The aim of this paper is to develop a direct and an effective simplified method for obtaining the cost-sharing scheme when some interested parties form a cooperative coalition to improve the ecological environment of Min River together. Firstly, we propose the solution concept of the least square prenucleolus of cooperative games with coalition values expressed by trapezoidal intuitionistic fuzzy numbers. Then, based on the square of the distance in the numerical value between two trapezoidal intuitionistic fuzzy numbers, we establish a corresponding quadratic programming model to obtain the least square prenucleolus, which can effectively avoid the information distortion and uncertainty enlargement brought about by the subtraction of trapezoidal intuitionistic fuzzy numbers. Finally, we give a numerical example about the cost-sharing of ecological construction in Fujian Province in China to show the validity, applicability, and advantages of the proposed model and method.

  7. 谈施工成本控制技巧%Control Techniques of Construction Cost

    Institute of Scientific and Technical Information of China (English)

    杨文雄

    2013-01-01

    Construction cost control is the core issue of cost management in engineering project. How to implement a series of scientific management, including prediction, plan, control, calculation, analysis and evaluation, under the premise of the contract requirements to guarantee the engineering quality and construction time, its process has a unique skill.%  施工成本控制是工程项目成本管理的核心问题,如何在保证满足工程质量、工期等合同要求的前提下,对项目实施过程中发生的费用进行预测、计划、控制、核算、分析与考核等一系列科学管理,其过程具有独特的技巧。

  8. Estimating costs of traffic crashes and crime: tools for informed decision making.

    Science.gov (United States)

    Streff, F M; Molnar, L J; Cohen, M A; Miller, T R; Rossman, S B

    1992-01-01

    Traffic crashes and crime both impose significant economic and social burdens through injury and loss of life, as well as property damage and loss. Efforts to reduce crashes and crime often result in competing demands on limited public resources. Comparable and up-to-date cost data on crashes and crime contribute to informed decisions about allocation of these resources in important ways. As a first step, cost data provide information about the magnitude of the problems of crashes and crime by allowing us to estimate associated dollar losses to society. More importantly, cost data on crashes and crime are essential to evaluating costs and benefits of various policy alternatives that compete for resources. This paper presents the first comparable comprehensive cost estimates for crashes and crime and applies them to crash and crime incidence data for Michigan to generate dollar losses for the state. An example illustrates how cost estimates can be used to evaluate costs and benefits of crash-reduction and crime-reduction policies in making resource allocation decisions. Traffic crash and selected index crime incidence data from the calendar year 1988 were obtained from the Michigan State Police. Costs for crashes and index crimes were generated and applied to incidence data to estimate dollar losses from crashes and index crimes for the state of Michigan. In 1988, index crimes in Michigan resulted in $0.8 billion in monetary costs and $2.4 billion in total monetary and nonmonetary quality-of-life costs (using the willingness-to-pay approach). Traffic crashes in Michigan resulted in $2.3 billion in monetary costs and $7.1 billion in total monetary and nonmonetary quality-of-life costs, nearly three times the costs of index crimes. Based on dollar losses to the state, the magnitude of the problem of traffic crashes clearly exceeded that of index crimes in Michigan in 1988. From a policy perspective, summing the total dollar losses from crashes or crime is of less

  9. Construction of Optimal-Path Maps for Homogeneous-Cost-Region Path-Planning Problems

    Science.gov (United States)

    1989-09-01

    JICA opposite-edge boundaries and tlCA cornercuting boundaries. HCA opposite-edge boundaries are the generalization of obstacle op- posite-cdge...4.o APPENDIX D - IIIGlI-COST EXTERIOR-GOAL JICA INTERIOR-BOUNDARY CONSTRUCTION SOURCE CODE AFile "bdrygen". A Updated 12 Jan 89. AThis proorrm...generates boundaries for JICA interiors and writes them to two files; "bdry out" Is a file of prolog ’ facts recording the boundary and terrain information

  10. Risks Leading to Cost Overrun in Building Construction from Consultants’ Perspective

    OpenAIRE

    Mahamid, Ibrahim; Dmaidi, Nabil

    2013-01-01

    This study aims at identifying the risk map for factors affecting cost overrun in building construction projects in the West Bank in Palestine from the consultants’ perspective. The field survey included 26 consultants. 41 factors are identified through literature review. The factors are divided into 5 groups. The analysis of the identified 41 factors indicates that 1 factor is located in the green zone, 14 factors are located in the yellow zone, and 26 factors are locate...

  11. Global cost of child survival: estimates from country-level validation

    Science.gov (United States)

    van Ekdom, Liselore; Scherpbier, Robert W; Niessen, Louis W

    2011-01-01

    Abstract Objective To cross-validate the global cost of scaling up child survival interventions to achieve the fourth Millennium Development Goal (MDG4) as estimated by the World Health Organization (WHO) in 2007 by using the latest country-provided data and new assumptions. Methods After the main cost categories for each country were identified, validation questionnaires were sent to 32 countries with high child mortality. Publicly available estimates for disease incidence, intervention coverage, prices and resources for individual-level and programme-level activities were validated against local data. Nine updates to the 2007 WHO model were generated using revised assumptions. Finally, estimates were extrapolated to 75 countries and combined with cost estimates for immunization and malaria programmes and for programmes for the prevention of mother-to-child transmission of the human immunodeficiency virus (HIV). Findings Twenty-six countries responded. Adjustments were largest for system- and programme-level data and smallest for patient data. Country-level validation caused a 53% increase in original cost estimates (i.e. 9 billion 2004 United States dollars [US$]) for 26 countries owing to revised system and programme assumptions, especially surrounding community health worker costs. The additional effect of updated population figures was small; updated epidemiologic figures increased costs by US$ 4 billion (+15%). New unit prices in the 26 countries that provided data increased estimates by US$ 4.3 billion (+16%). Extrapolation to 75 countries increased the original price estimate by US$ 33 billion (+80%) for 2010–2015. Conclusion Country-level validation had a significant effect on the cost estimate. Price adaptations and programme-related assumptions contributed substantially. An additional 74 billion US$ 2005 (representing a 12% increase in total health expenditure) would be needed between 2010 and 2015. Given resource constraints, countries will need to

  12. Solar thermal technology development: Estimated market size and energy cost savings. Volume 1: Executive summary

    Science.gov (United States)

    Gates, W. R.

    1983-01-01

    Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. The fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. STT R&D is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), dependng on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest.

  13. Solar thermal technology development: Estimated market size and energy cost savings. Volume 1: Executive summary

    Science.gov (United States)

    Gates, W. R.

    1983-02-01

    Estimated future energy cost savings associated with the development of cost-competitive solar thermal technologies (STT) are discussed. Analysis is restricted to STT in electric applications for 16 high-insolation/high-energy-price states. The fuel price scenarios and three 1990 STT system costs are considered, reflecting uncertainty over future fuel prices and STT cost projections. STT R&D is found to be unacceptably risky for private industry in the absence of federal support. Energy cost savings were projected to range from $0 to $10 billion (1990 values in 1981 dollars), dependng on the system cost and fuel price scenario. Normal R&D investment risks are accentuated because the Organization of Petroleum Exporting Countries (OPEC) cartel can artificially manipulate oil prices and undercut growth of alternative energy sources. Federal participation in STT R&D to help capture the potential benefits of developing cost-competitive STT was found to be in the national interest.

  14. Assessing the accuracy of wildland fire situation analysis (WFSA) fire size and suppression cost estimates.

    Science.gov (United States)

    Geoffrey H. Donovan; Peter. Noordijk

    2005-01-01

    To determine the optimal suppression strategy for escaped wildfires, federal land managers are requiredto conduct a wildland fire situation analysis (WFSA). As part of the WFSA process, fire managers estimate final fire size and suppression costs. Estimates from 58 WFSAs conducted during the 2002 fire season are compared to actual outcomes. Results indicate that...

  15. Performance and cost evaluation of constructed wetland for domestic waste water treatment.

    Science.gov (United States)

    Deeptha, V T; Sudarsan, J S; Baskar, G

    2015-09-01

    Root zone treatment through constructed wetlands is an engineered method of purifying wastewater. The aim of the present research was to study the potential of wetland plants Phragmites and Typha in treatment of wastewater and to compare the cost of constructed wetlands with that of conventional treatment systems. A pilot wetland unit of size 2x1x0.9 m was constructed in the campus. 3x3 rows of plants were transplanted into the pilot unit and subjected to wastewater from the hostels and other campus buildings. The raw wastewater and treated wastewater were collected periodically and tested for Total nitrogen (TN),Total Phosphorous (TP), Biological Oxygen Demand (BOD), Chemical Oxygen Demand (COD). It was observed that this pilot unit reduced the concentrations of TN, TP, BOD and COD by 76, 73, 83 and 86%, respectively, on an average. Root zone system achieved standards for tertiary treatment with low operating costs, low maintenance costs, enhance the landscape, provide a natural habitat for birds, and did not emit any odour.

  16. Construction and Implementation of a Low-Cost Rubidium Magneto-Optical Trap

    Science.gov (United States)

    Olson, Judith

    2011-03-01

    A low-cost magneto-optical trap (MOT) for ultra-cold atoms is a wonderful tool for undergraduate research and teaching laboratories that highlights many topics in modern physics. We researched and created such a MOT using two external-cavity diode lasers, two laser locking systems, optics, magnetic coils, and Rubidium vapor cells. At our undergraduate institution, we chose a combination of equipment that we fabricated ourselves together with some purchased items as an optimum balance between cost and building time. However, an emphasis was placed upon self-construction of components, such as machining the laser cavities and constructing the majority of the circuitry within the institution. The total cost of our MOT was about 25,000. We were successfully able to trap more than 10 million Rubidium atoms in 1 cubic centimeter. Such a MOT is a feasible addition to any undergraduate course of study. The theory of operation and construction methods of our MOT will be presented along with our first measurement results. Many thanks to Ithaca College and the Ithaca College Department of Physics.

  17. The Estimation and Inclusion of Presenteeism Costs in Applied Economic Evaluation: A Systematic Review.

    Science.gov (United States)

    Kigozi, Jesse; Jowett, Sue; Lewis, Martyn; Barton, Pelham; Coast, Joanna

    2017-03-01

    Given the significant costs of reduced productivity (presenteeism) in comparison to absenteeism, and overall societal costs, presenteeism has a potentially important role to play in economic evaluations. However, these costs are often excluded. The objective of this study is to review applied cost of illness studies and economic evaluations to identify valuation methods used for, and impact of including presenteeism costs in practice. A structured systematic review was carried out to explore (i) the extent to which presenteeism has been applied in cost of illness studies and economic evaluations and (ii) the overall impact of including presenteeism on overall costs and outcomes. Potential articles were identified by searching Medline, PsycINFO and NHS EED databases. A standard template was developed and used to extract information from economic evaluations and cost of illness studies incorporating presenteeism costs. A total of 28 studies were included in the systematic review which also demonstrated that presenteeism costs are rarely included in full economic evaluations. Estimation and monetisation methods differed between the instruments. The impact of disease on presenteeism whilst in paid work is high. The potential impact of presenteeism costs needs to be highlighted and greater consideration should be given to including these in economic evaluations and cost of illness studies. The importance of including presenteeism costs when conducting economic evaluation from a societal perspective should be emphasised in national economic guidelines and more methodological work is required to improve the practical application of presenteeism instruments to generate productivity cost estimates. Copyright © 2017 International Society for Pharmacoeconomics and Outcomes Research (ISPOR). Published by Elsevier Inc. All rights reserved.

  18. Case Study to Apply Work Difficulty Factors to Decommissioning Cost Estimates

    Energy Technology Data Exchange (ETDEWEB)

    Yun, Taesik; Jung, Hyejin; Oh, Jaeyoung; Kim, Younggook [KHNP CRI, Daejeon (Korea, Republic of)

    2016-10-15

    This article is prepared as a guideline regarding how to apply the work difficult factor (WDF) when it comes to the estimates of the decommissioning costs. Although several cases of the decommissioning cost estimates have been made for a few commercial nuclear power plants, the different technical, site-specific economic assumptions used make it difficult to interpret those cost estimates and compare them with that of Kori-1. In addition, it is clear that we are supposed to experience difficulties being created in the process of the Kori-1 and the virtual inaccessibility to the limited areas at the pre-decommissioning stage. Estimating decommissioning costs is one of the most crucial processes since it encompasses all the spectrum of decommissioning activities from the planning to the last evaluation on whether the decommissioning has successfully been proceeded from the safety and economic perspectives. Here I suggested the activity dependent costs is only related to WDFs of the incumbent plant planning or undergone to be decommissioned since as a matter of fact, estimating WDFs is the core process to articulately scrutinize the practical costs to apply to Kori-1 project.

  19. An Estimation of Private Household Costs to Receive Free Oral Cholera Vaccine in Odisha, India.

    Directory of Open Access Journals (Sweden)

    Vittal Mogasale

    Full Text Available Service provider costs for vaccine delivery have been well documented; however, vaccine recipients' costs have drawn less attention. This research explores the private household out-of-pocket and opportunity costs incurred to receive free oral cholera vaccine during a mass vaccination campaign in rural Odisha, India.Following a government-driven oral cholera mass vaccination campaign targeting population over one year of age, a questionnaire-based cross-sectional survey was conducted to estimate private household costs among vaccine recipients. The questionnaire captured travel costs as well as time and wage loss for self and accompanying persons. The productivity loss was estimated using three methods: self-reported, government defined minimum daily wages and gross domestic product per capita in Odisha.On average, families were located 282.7 (SD = 254.5 meters from the nearest vaccination booths. Most family members either walked or bicycled to the vaccination sites and spent on average 26.5 minutes on travel and 15.7 minutes on waiting. Depending upon the methodology, the estimated productivity loss due to potential foregone income ranged from $0.15 to $0.29 per dose of cholera vaccine received. The private household cost of receiving oral cholera vaccine constituted 24.6% to 38.0% of overall vaccine delivery costs.The private household costs resulting from productivity loss for receiving a free oral cholera vaccine is a substantial proportion of overall vaccine delivery cost and may influence vaccine uptake. Policy makers and program managers need to recognize the importance of private costs and consider how to balance programmatic delivery costs with private household costs to receive vaccines.

  20. An Estimation of Private Household Costs to Receive Free Oral Cholera Vaccine in Odisha, India.

    Science.gov (United States)

    Mogasale, Vittal; Kar, Shantanu K; Kim, Jong-Hoon; Mogasale, Vijayalaxmi V; Kerketta, Anna S; Patnaik, Bikash; Rath, Shyam Bandhu; Puri, Mahesh K; You, Young Ae; Khuntia, Hemant K; Maskery, Brian; Wierzba, Thomas F; Sah, Binod

    2015-01-01

    Service provider costs for vaccine delivery have been well documented; however, vaccine recipients' costs have drawn less attention. This research explores the private household out-of-pocket and opportunity costs incurred to receive free oral cholera vaccine during a mass vaccination campaign in rural Odisha, India. Following a government-driven oral cholera mass vaccination campaign targeting population over one year of age, a questionnaire-based cross-sectional survey was conducted to estimate private household costs among vaccine recipients. The questionnaire captured travel costs as well as time and wage loss for self and accompanying persons. The productivity loss was estimated using three methods: self-reported, government defined minimum daily wages and gross domestic product per capita in Odisha. On average, families were located 282.7 (SD = 254.5) meters from the nearest vaccination booths. Most family members either walked or bicycled to the vaccination sites and spent on average 26.5 minutes on travel and 15.7 minutes on waiting. Depending upon the methodology, the estimated productivity loss due to potential foregone income ranged from $0.15 to $0.29 per dose of cholera vaccine received. The private household cost of receiving oral cholera vaccine constituted 24.6% to 38.0% of overall vaccine delivery costs. The private household costs resulting from productivity loss for receiving a free oral cholera vaccine is a substantial proportion of overall vaccine delivery cost and may influence vaccine uptake. Policy makers and program managers need to recognize the importance of private costs and consider how to balance programmatic delivery costs with private household costs to receive vaccines.

  1. Regional Cost Estimates for Reclamation Practices on Arid and Semiarid Lands

    Energy Technology Data Exchange (ETDEWEB)

    W. K. Ostler

    2002-02-01

    The U.S. Army uses the Integrated Training Area Management program for managing training land. One of the major objectives of the Integrated Training Area Management program has been to develop a method for estimating training land carrying capacity in a sustainable manner. The Army Training and Testing Area Carrying Capacity methodology measures training load in terms of Maneuver Impact Miles. One Maneuver Impact Mile is the equivalent impact of an M1A2 tank traveling one mile while participating in an armor battalion field training exercise. The Army Training and Testing Area Carrying Capacity methodology is also designed to predict land maintenance costs in terms of dollars per Maneuver Impact Mile. The overall cost factor is calculated using the historical cost of land maintenance practices and the effectiveness of controlling erosion. Because land maintenance costs and effectiveness are influenced by the characteristics of the land, Army Training and Testing Area Carrying Capacity cost factors must be developed for each ecological region of the country. Costs for land maintenance activities are presented here for the semiarid and arid regions of the United States. Five ecoregions are recognized, and average values for reclamation activities are presented. Because there are many variables that can influence costs, ranges for reclamation activities are also presented. Costs are broken down into six major categories: seedbed preparation, fertilization, seeding, planting, mulching, and supplemental erosion control. Costs for most land reclamation practices and materials varied widely within and between ecological provinces. Although regional cost patterns were evident for some practices, the patterns were not consistent between practices. For the purpose of estimating land reclamation costs for the Army Training and Testing Area Carrying Capacity methodology, it may be desirable to use the ''Combined Average'' of all provinces found in the last

  2. The integration of price/cost modelling and construction planning - the automated generation of construc­tion operation

    Directory of Open Access Journals (Sweden)

    P. A. Bowen

    1997-07-01

    Full Text Available The fact that traditional price/cost models are unrelated to the construction process renders them largely unsuited to the provision of meaningful price/cost advice. The nature and lengthiness of the construction planning process has precluded its incorporation into price/cost modelling during the pre-tender phase of the traditional building procurement process. The nub of the modelling problem has been how to integrate the complex process of construction planning into the pre-tender price/cost modelling process. In this paper the authors propose the synthesis of artificial intelligence techniques and construction planning techniques, resulting in a conceptual framework for a network-based cost modelling system for use by quantity surveyors in the cost modelling of buildings.

  3. 施工项目成本控制%Construction Project Cost Control

    Institute of Scientific and Technical Information of China (English)

    李开玉

    2012-01-01

    加强工程项目成本管理是施工企业向科学管理进一步迈进的具体举措,是使施工企业在激烈的市场竞争中不断完善自我,做大做强的必经之路.完善项目成本的管理体系和高质量项目成本管理工作是不可缺少的.%Strengthening project cost management is the specific initiatives to further step to the scientific management for the construction enterprises, and the only way to constantly improve themselves in the fierce market competition and become bigger and stronger. It is indispensable to improve the cost management system of the project and high-quality cost management.

  4. A national hypertension treatment program in Germany and its estimated impact on costs, life expectancy, and cost-effectiveness.

    Science.gov (United States)

    Gandjour, Afschin; Stock, Stephanie

    2007-10-01

    Almost 15 million Germans may suffer from untreated hypertension. The purpose of this paper is to estimate the cost-effectiveness of a national hypertension treatment program compared to no program. A Markov decision model from the perspective of the statutory health insurance (SHI) was built. All data were taken from secondary sources. The target population consists of hypertensive male and female patients at high or low risk for cardiovascular events at different age groups (40-49, 50-59, and 60-69 years). The analysis shows fairly moderate cost-effectiveness ratios even for low-risk groups (less than 12,000 euros per life year gained). In women at high risk antihypertensive treatment even leads to savings. This suggests that a national hypertension treatment program provides good value for money. Given the considerable costs of the program itself, any savings from avoiding long-term consequences of hypertension are likely to be offset, however.

  5. Estimating the Cost of Neurosurgical Procedures in a Low-Income Setting: An Observational Economic Analysis.

    Science.gov (United States)

    Abdelgadir, Jihad; Tran, Tu; Muhindo, Alex; Obiga, Doomwin; Mukasa, John; Ssenyonjo, Hussein; Muhumza, Michael; Kiryabwire, Joel; Haglund, Michael M; Sloan, Frank A

    2017-05-01

    There are no data on cost of neurosurgery in low-income and middle-income countries. The objective of this study was to estimate the cost of neurosurgical procedures in a low-resource setting to better inform resource allocation and health sector planning. In this observational economic analysis, microcosting was used to estimate the direct and indirect costs of neurosurgical procedures at Mulago National Referral Hospital (Kampala, Uganda). During the study period, October 2014 to September 2015, 1440 charts were reviewed. Of these patients, 434 had surgery, whereas the other 1006 were treated nonsurgically. Thirteen types of procedures were performed at the hospital. The estimated mean cost of a neurosurgical procedure was $542.14 (standard deviation [SD], $253.62). The mean cost of different procedures ranged from $291 (SD, $101) for burr hole evacuations to $1,221 (SD, $473) for excision of brain tumors. For most surgeries, overhead costs represented the largest proportion of the total cost (29%-41%). This is the first study using primary data to determine the cost of neurosurgery in a low-resource setting. Operating theater capacity is likely the binding constraint on operative volume, and thus, investing in operating theaters should achieve a higher level of efficiency. Findings from this study could be used by stakeholders and policy makers for resource allocation and to perform economic analyses to establish the value of neurosurgery in achieving global health goals. Copyright © 2017 Elsevier Inc. All rights reserved.

  6. Estimates of economic costs of alcohol and drug abuse and mental illness, 1985 and 1988.

    OpenAIRE

    Rice, D P; Kelman, S; Miller, L S

    1991-01-01

    The high prevalence of alcohol and drug abuse and mental illness imposes a substantial financial burden on those affected and on society. The authors present estimates of the economic costs from these causes for 1985 and 1988, based on current and reliable data available from national surveys and the use of new costing methodology. The total losses to the economy related to alcohol and drug abuse and mental illness for 1988 are estimated at $273.3 billion. The estimate includes $85.8 billion ...

  7. Procedure for estimating nonfuel operation and maintenance costs for large steam-electric power plants

    Energy Technology Data Exchange (ETDEWEB)

    Myers, M.L.; Fuller, L.C.

    1979-01-01

    Revised guidelines are presented for estimating annual nonfuel operation and maintenance costs for large steam-electric power plants, specifically light-water-reactor plants and coal-fired plants. Previous guidelines were published in October 1975 in ERDA 76-37, a Procedure for Estimating Nonfuel Operating and Maintenance Costs for Large Steam-Electric Power Plants. Estimates for coal-fired plants include the option of limestone slurry scrubbing for flue gas desulfurization. A computer program, OMCOST, is also presented which covers all plant options.

  8. A Project Management Approach to Using Simulation for Cost Estimation on Large, Complex Software Development Projects

    Science.gov (United States)

    Mizell, Carolyn; Malone, Linda

    2007-01-01

    It is very difficult for project managers to develop accurate cost and schedule estimates for large, complex software development projects. None of the approaches or tools available today can estimate the true cost of software with any high degree of accuracy early in a project. This paper provides an approach that utilizes a software development process simulation model that considers and conveys the level of uncertainty that exists when developing an initial estimate. A NASA project will be analyzed using simulation and data from the Software Engineering Laboratory to show the benefits of such an approach.

  9. Estimating the Proportion of Childhood Cancer Cases and Costs Attributable to the Environment in California.

    Science.gov (United States)

    Nelson, Lauren; Valle, Jhaqueline; King, Galatea; Mills, Paul K; Richardson, Maxwell J; Roberts, Eric M; Smith, Daniel; English, Paul

    2017-05-01

    To estimate the proportion of cases and costs of the most common cancers among children aged 0 to 14 years (leukemia, lymphoma, and brain or central nervous system tumors) that were attributable to preventable environmental pollution in California in 2013. We conducted a literature review to identify preventable environmental hazards associated with childhood cancer. We combined risk estimates with California-specific exposure prevalence estimates to calculate hazard-specific environmental attributable fractions (EAFs). We combined hazard-specific EAFs to estimate EAFs for each cancer and calculated an overall EAF. Estimated economic costs included annual (indirect and direct medical) and lifetime costs. Hazards associated with childhood cancer risks included tobacco smoke, residential exposures, and parental occupational exposures. Estimated EAFs for leukemia, lymphoma, and brain or central nervous system cancer were 21.3% (range = 11.7%-30.9%), 16.1% (range = 15.0%-17.2%), and 2.0% (range = 1.7%-2.2%), respectively. The combined EAF was 15.1% (range = 9.4%-20.7%), representing $18.6 million (range = $11.6 to $25.5 million) in annual costs and $31 million in lifetime costs. Reducing environmental hazards and exposures in California could substantially reduce the human burden of childhood cancer and result in significant annual and lifetime savings.

  10. Concept of ground facilities and the analyses of the factors for cost estimation

    Energy Technology Data Exchange (ETDEWEB)

    Lee, J. Y.; Choi, H. J.; Choi, J. W.; Kim, S. K.; Cho, D. K

    2007-09-15

    The geologic disposal of spent fuels generated from the nuclear power plants is the only way to protect the human beings and the surrounding environments present and future. The direct disposal of the spent fuels from the nuclear power plants is considered, and a Korean Reference HLW disposal System(KRS) suitable for our representative geological conditions have been developed. In this study, the concept of the spent fuel encapsulation process as a key of the above ground facilities for deep geological disposal was established. To do this, the design requirements, such as the functions and the spent fuel accumulations, were reviewed. Also, the design principles and the bases were established. Based on the requirements and the bases, the encapsulation process of the spent fuel from receiving spent fuel of nuclear power plants to transferring canister into the underground repository was established. Simulation for the above-ground facility in graphic circumstances through KRS design concept and disposal scenarios for spent nuclear fuel showed that an appropriate process was performed based on facility design concept and required for more improvement on construction facility by actual demonstration test. And, based on the concept of the above ground facilities for the Korean Reference HLW disposal System, the analyses of the factors for the cost estimation was carried out.

  11. Geothermal wells: the cost benefit of fracture stimulation estimated by the GEOCOM code. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Brown, G.L.

    1983-09-01

    GEOCOM, a computer code that provides life cycle cost/benefit analysis of completion technologies applied to geothermal wells, is used to study fracture stimulation techniques. it is estimated that stimulation must increase flow by roughly tons per $100,000 in order to be cost effective. Typically, hydraulic fracturing costs $100,000 to $500,000 per well, and the attempts at stimulation to date have generally not achieved the desired flow increases. The cost effectiveness of hydraulic fracturing is considered for several geothermal reservoirs.

  12. Query cost estimation through remote system contention states analysis over the Internet

    OpenAIRE

    Liu, Weiru; Liao, Z; Hong, Jun

    2004-01-01

    Query processing over the Internet involving autonomous data sources is a major task in data integration. It requires the estimated costs of possible queries in order to select the best one that has the minimum cost. In this context, the cost of a query is affected by three factors: network congestion, server contention state, and complexity of the query. In this paper, we study the effects of both the network congestion and server contention state on the cost of a query. We refer to these tw...

  13. Estimating resource costs of compliance with EU WFD ecological status requirements at the river basin scale

    DEFF Research Database (Denmark)

    Riegels, Niels; Jensen, Roar; Benasson, Lisa

    2011-01-01

    Resource costs of meeting EU WFD ecological status requirements at the river basin scale are estimated by comparing net benefits of water use given ecological status constraints to baseline water use values. Resource costs are interpreted as opportunity costs of water use arising from water...... an allocation is found that maximizes net benefits given WFD requirements. Water use values are estimated for urban/domestic, agricultural, industrial, livestock, and tourism water users. Ecological status is estimated using metrics that relate average monthly river flow volumes to the natural hydrologic regime....... Ecological status is only estimated with respect to hydrologic regime; other indicators are ignored in this analysis. The decision variable in the optimization is the price of water, which is used to vary demands using consumer and producer water demand functions. The price-based optimization approach...

  14. 浅谈水利水电工程施工成本控制与管理%Water conservancy and hydropower proj ect construction cost control and management

    Institute of Scientific and Technical Information of China (English)

    刘益惠

    2014-01-01

    Water conservancy and hydropower proj ect construction costs are generally divided into two parts:construction cost (including its direct costs,other direct costs and field expenses)and management expenses (specifically including enterprise manageG ment fees,finance charges and other costs),cost estimates of engineering construction cost control is an important step.%水利水电工程的建筑成本一般可分两部分:施工成本(具体包括直接费、其他直接费和现场经费)和经营管理费用(具体包括企业管理费、财务费和其他费用),施工成本预算是工程造价控制的重要步骤。

  15. Estimating the cost of cervical cancer screening in five developing countries

    Directory of Open Access Journals (Sweden)

    Goldie Sue J

    2006-08-01

    Full Text Available Abstract Background Cost-effectiveness analyses (CEAs can provide useful information to policymakers concerned with the broad allocation of resources as well as to local decision makers choosing between different options for reducing the burden from a single disease. For the latter, it is important to use country-specific data when possible and to represent cost differences between countries that might make one strategy more or less attractive than another strategy locally. As part of a CEA of cervical cancer screening in five developing countries, we supplemented limited primary cost data by developing other estimation techniques for direct medical and non-medical costs associated with alternative screening approaches using one of three initial screening tests: simple visual screening, HPV DNA testing, and cervical cytology. Here, we report estimation methods and results for three cost areas in which data were lacking. Methods To supplement direct medical costs, including staff, supplies, and equipment depreciation using country-specific data, we used alternative techniques to quantify cervical cytology and HPV DNA laboratory sample processing costs. We used a detailed quantity and price approach whose face validity was compared to an adaptation of a US laboratory estimation methodology. This methodology was also used to project annual sample processing capacities for each laboratory type. The cost of sample transport from the clinic to the laboratory was estimated using spatial models. A plausible range of the cost of patient time spent seeking and receiving screening was estimated using only formal sector employment and wages as well as using both formal and informal sector participation and country-specific minimum wages. Data sources included primary data from country-specific studies, international databases, international prices, and expert opinion. Costs were standardized to year 2000 international dollars using inflation adjustment and

  16. A bottom-up approach to estimating cost elements of REDD+ pilot projects in Tanzania

    Directory of Open Access Journals (Sweden)

    Merger Eduard

    2012-08-01

    Full Text Available Abstract Background Several previous global REDD+ cost studies have been conducted, demonstrating that payments for maintaining forest carbon stocks have significant potential to be a cost-effective mechanism for climate change mitigation. These studies have mostly followed highly aggregated top-down approaches without estimating the full range of REDD+ costs elements, thus underestimating the actual costs of REDD+. Based on three REDD+ pilot projects in Tanzania, representing an area of 327,825 ha, this study explicitly adopts a bottom-up approach to data assessment. By estimating opportunity, implementation, transaction and institutional costs of REDD+ we develop a practical and replicable methodological framework to consistently assess REDD+ cost elements. Results Based on historical land use change patterns, current region-specific economic conditions and carbon stocks, project-specific opportunity costs ranged between US$ -7.8 and 28.8 tCOxxxx for deforestation and forest degradation drivers such as agriculture, fuel wood production, unsustainable timber extraction and pasture expansion. The mean opportunity costs for the three projects ranged between US$ 10.1 – 12.5 tCO2. Implementation costs comprised between 89% and 95% of total project costs (excluding opportunity costs ranging between US$ 4.5 - 12.2 tCO2 for a period of 30 years. Transaction costs for measurement, reporting, verification (MRV, and other carbon market related compliance costs comprised a minor share, between US$ 0.21 - 1.46 tCO2. Similarly, the institutional costs comprised around 1% of total REDD+ costs in a range of US$ 0.06 – 0.11 tCO2. Conclusions The use of bottom-up approaches to estimate REDD+ economics by considering regional variations in economic conditions and carbon stocks has been shown to be an appropriate approach to provide policy and decision-makers robust economic information on REDD+. The assessment of opportunity costs is a crucial first step to

  17. Constrained low-cost GPS/INS filter with encoder bias estimation for ground vehicles' applications

    Science.gov (United States)

    Abdel-Hafez, Mamoun F.; Saadeddin, Kamal; Amin Jarrah, Mohammad

    2015-06-01

    In this paper, a constrained, fault-tolerant, low-cost navigation system is proposed for ground vehicle's applications. The system is designed to provide a vehicle navigation solution at 50 Hz by fusing the measurements of the inertial measurement unit (IMU), the global positioning system (GPS) receiver, and the velocity measurement from wheel encoders. A high-integrity estimation filter is proposed to obtain a high accuracy state estimate. The filter utilizes vehicle velocity constraints measurement to enhance the estimation accuracy. However, if the velocity measurement of the encoder is biased, the accuracy of the estimate is degraded. Therefore, a noise estimation algorithm is proposed to estimate a possible bias in the velocity measurement of the encoder. Experimental tests, with simulated biases on the encoder's readings, are conducted and the obtained results are presented. The experimental results show the enhancement in the estimation accuracy when the simulated bias is estimated using the proposed method.

  18. Activity-based Costing and Road Construction Project Cost Management%作业成本法与公路施工项目成本管理

    Institute of Scientific and Technical Information of China (English)

    石超云; 赵克剑

    2012-01-01

    公路施工企业的间接费用、管理费用等在总成本中的比重日益提高,传统的成本控制方法面临挑战,公路施工企业不得不考虑将作业成本法引入公路施工项目管理,论文从分析公路施工项目成本和管理的特征出发,阐述公路施工项目应用作业成本法可行性,分析公路施工项目运营作业成本法的条件,以及运用作业成本法潜在效果.%The proportion of indirect costs, administrative expenses of highway construction enterprises in the total cost are increasing and traditional method of cost control face challenges. Highway construction companies have to consider the activity-based costing into a highway construction project management, the paper described the feasibility of the highway construction project application activity-based costing, analysis of the operational conditions of the operating cost method of highway construction projects, as well as the potential effect of using activity-based costing.

  19. Coal gasification systems engineering and analysis. Appendix E: Cost estimation and economic evaluation methodology

    Science.gov (United States)

    1980-01-01

    The cost estimation and economic evaluation methodologies presented are consistent with industry practice for assessing capital investment requirements and operating costs of coal conversion systems. All values stated are based on January, 1980 dollars with appropriate recognition of the time value of money. Evaluation of project economic feasibility can be considered a two step process (subject to considerable refinement). First, the costs of the project must be quantified and second, the price at which the product can be manufacturd must be determined. These two major categories are discussed. The summary of methodology is divided into five parts: (1) systems costs, (2)instant plant costs, (3) annual operating costs, (4) escalation and discounting process, and (5) product pricing.

  20. MESSOC capabilities and results. [Model for Estimating Space Station Opertions Costs

    Science.gov (United States)

    Shishko, Robert

    1990-01-01

    MESSOC (Model for Estimating Space Station Operations Costs) is the result of a multi-year effort by NASA to understand and model the mature operations cost of Space Station Freedom. This paper focuses on MESSOC's ability to contribute to life-cycle cost analyses through its logistics equations and databases. Together, these afford MESSOC the capability to project not only annual logistics costs for a variety of Space Station scenarios, but critical non-cost logistics results such as annual Station maintenance crewhours, upweight/downweight, and on-orbit sparing availability as well. MESSOC results using current logistics databases and baseline scenario have already shown important implications for on-orbit maintenance approaches, space transportation systems, and international operations cost sharing.

  1. Using propensity scores to estimate the cost-effectiveness of medical therapies.

    Science.gov (United States)

    Indurkhya, Alka; Mitra, Nandita; Schrag, Deborah

    2006-05-15

    The cost-effectiveness ratio is a popular statistic that is used by policy makers to decide which programs are cost-effective in the public health sector. Recently, the net monetary benefit has been proposed as an alternative statistical summary measure to overcome the limitations associated with the cost-effectiveness ratio. Research on using the net monetary benefit to assess the cost-effectiveness of therapies in non-randomized studies has yet to be done. Propensity scores are useful in estimating adjusted effectiveness of programs that have non-randomized or quasi-experimental designs. This article introduces the use of propensity score adjustment in cost-effectiveness analyses to estimate net monetary benefits for non-randomized studies. The uncertainty associated with the net monetary benefit estimate is evaluated using cost-effectiveness acceptability curves. Our method is illustrated by applying it to SEER-Medicare data for muscle invasive bladder cancer to determine the most cost-effective treatment protocol.

  2. The economics of tobacco in Lebanon: an estimation of the social costs of tobacco consumption.

    Science.gov (United States)

    Salti, Nisreen; Chaaban, Jad; Naamani, Nadia

    2014-05-01

    Assess the socioeconomic costs of smoking in Lebanon and understand the tobacco market and identify the winners and losers from the Lebanese tobacco trade. We take a close look at the market for tobacco and related markets to identify the main stakeholders and estimate the direct costs and benefits of tobacco. We also estimate lower bounds for the costs of tobacco, in terms of lost productivity, the cost of medical treatment, lost production due to premature death, and environmental damage. The paucity of data means our cost estimates are conservative lower bounds and we explicitly list the effects that we are unable to include. We identify the main actors in the tobacco trade: the Régie (the state-owned monopoly which regulates the tobacco trade), tobacco farmers, international tobacco companies, local distributors, retailers, consumers, and advertising firms. We identify as proximate actors the Ministries of Finance and Health, employers, and patients of smoking-related illnesses. In 2008, tobacco trade in Lebanon led to a total social cost of $326.7 million (1.1% of GDP). Low price tags on imported cigarettes not only increase smoking prevalence, but they also result in a net economic loss. Lebanese policymakers should consider the overall deficit from tobacco trade and implement the guidelines presented in the Framework Convention on Tobacco Control to at once increase government revenue and reduce government outlays, and save the labor market and the environment substantial costs.

  3. Reusable Reentry Satellite (RRS) system design study: System cost estimates document

    Science.gov (United States)

    1991-01-01

    The Reusable Reentry Satellite (RRS) program was initiated to provide life science investigators relatively inexpensive, frequent access to space for extended periods of time with eventual satellite recovery on earth. The RRS will provide an on-orbit laboratory for research on biological and material processes, be launched from a number of expendable launch vehicles, and operate in Low-Altitude Earth Orbit (LEO) as a free-flying unmanned laboratory. SAIC's design will provide independent atmospheric reentry and soft landing in the continental U.S., orbit for a maximum of 60 days, and will sustain three flights per year for 10 years. The Reusable Reentry Vehicle (RRV) will be 3-axis stabilized with artificial gravity up to 1.5g's, be rugged and easily maintainable, and have a modular design to accommodate a satellite bus and separate modular payloads (e.g., rodent module, general biological module, ESA microgravity botany facility, general botany module). The purpose of this System Cost Estimate Document is to provide a Life Cycle Cost Estimate (LCCE) for a NASA RRS Program using SAIC's RRS design. The estimate includes development, procurement, and 10 years of operations and support (O&S) costs for NASA's RRS program. The estimate does not include costs for other agencies which may track or interface with the RRS program (e.g., Air Force tracking agencies or individual RRS experimenters involved with special payload modules (PM's)). The life cycle cost estimate extends over the 10 year operation and support period FY99-2008.

  4. Estimating the harms and costs of cannabis-attributable collisions in the Canadian provinces.

    Science.gov (United States)

    Wettlaufer, Ashley; Florica, Roxana O; Asbridge, Mark; Beirness, Douglas; Brubacher, Jeffrey; Callaghan, Russell; Fischer, Benedikt; Gmel, Gerrit; Imtiaz, Sameer; Mann, Robert E; McKiernan, Anna; Rehm, Jürgen

    2017-04-01

    In 2012, 10% of Canadians used cannabis and just under half of those who use cannabis were estimated to have driven under the influence of cannabis. Substantial evidence has accumulated to indicate that driving after cannabis use increases collision risk significantly; however, little is known about the extent and costs associated with cannabis-related traffic collisions. This study quantifies the costs of cannabis-related traffic collisions in the Canadian provinces. Province and age specific cannabis-attributable fractions (CAFs) were calculated for traffic collisions of varying severity. The CAFs were applied to traffic collision data in order to estimate the total number of persons involved in cannabis-attributable fatal, injury and property damage only collisions. Social cost values, based on willingness-to-pay and direct costs, were applied to estimate the costs associated with cannabis-related traffic collisions. The 95% confidence intervals were calculated using Monte Carlo methodology. Cannabis-attributable traffic collisions were estimated to have caused 75 deaths (95% CI: 0-213), 4407 injuries (95% CI: 20-11,549) and 7794 people (95% CI: 3107-13,086) were involved in property damage only collisions in Canada in 2012, totalling $1,094,972,062 (95% CI: 37,069,392-2,934,108,175) with costs being highest among younger people. The cannabis-attributable driving harms and costs are substantial. The harm and cost of cannabis-related collisions is an important factor to consider as Canada looks to legalize and regulate the sale of cannabis. This analysis provides evidence to help inform Canadian policy to reduce the human and economic costs of drug-impaired driving. Copyright © 2017 Canadian Centre on Substance Abuse. Published by Elsevier B.V. All rights reserved.

  5. An estimate of the cost of administering intravenous biological agents in Spanish day hospitals

    Science.gov (United States)

    Nolla, Joan Miquel; Martín, Esperanza; Llamas, Pilar; Manero, Javier; Rodríguez de la Serna, Arturo; Fernández-Miera, Manuel Francisco; Rodríguez, Mercedes; López, José Manuel; Ivanova, Alexandra; Aragón, Belén

    2017-01-01

    Objective To estimate the unit costs of administering intravenous (IV) biological agents in day hospitals (DHs) in the Spanish National Health System. Patients and methods Data were obtained from 188 patients with rheumatoid arthritis, collected from nine DHs, receiving one of the following IV therapies: infliximab (n=48), rituximab (n=38), abatacept (n=41), or tocilizumab (n=61). The fieldwork was carried out between March 2013 and March 2014. The following three groups of costs were considered: 1) structural costs, 2) material costs, and 3) staff costs. Staff costs were considered a fixed cost and were estimated according to the DH theoretical level of activity, which includes, as well as personal care of each patient, the DH general activities (complete imputation method, CIM). In addition, an alternative calculation was performed, in which the staff costs were considered a variable cost imputed according to the time spent on direct care (partial imputation method, PIM). All costs were expressed in euros for the reference year 2014. Results The average total cost was €146.12 per infusion (standard deviation [SD] ±87.11; CIM) and €29.70 per infusion (SD ±11.42; PIM). The structure-related costs per infusion varied between €2.23 and €62.35 per patient and DH; the cost of consumables oscillated between €3.48 and €20.34 per patient and DH. In terms of the care process, the average difference between the shortest and the longest time taken by different hospitals to administer an IV biological therapy was 113 minutes. Conclusion The average total cost of infusion was less than that normally used in models of economic evaluation coming from secondary sources. This cost is even less when the staff costs are imputed according to the PIM. A high degree of variability was observed between different DHs in the cost of the consumables, in the structure-related costs, and in those of the care process. PMID:28356746

  6. Re-constructing historical Adelie penguin abundance estimates by retrospectively accounting for detection bias.

    Directory of Open Access Journals (Sweden)

    Colin Southwell

    Full Text Available Seabirds and other land-breeding marine predators are considered to be useful and practical indicators of the state of marine ecosystems because of their dependence on marine prey and the accessibility of their populations at breeding colonies. Historical counts of breeding populations of these higher-order marine predators are one of few data sources available for inferring past change in marine ecosystems. However, historical abundance estimates derived from these population counts may be subject to unrecognised bias and uncertainty because of variable attendance of birds at breeding colonies and variable timing of past population surveys. We retrospectively accounted for detection bias in historical abundance estimates of the colonial, land-breeding Adélie penguin through an analysis of 222 historical abundance estimates from 81 breeding sites in east Antarctica. The published abundance estimates were de-constructed to retrieve the raw count data and then re-constructed by applying contemporary adjustment factors obtained from remotely operating time-lapse cameras. The re-construction process incorporated spatial and temporal variation in phenology and attendance by using data from cameras deployed at multiple sites over multiple years and propagating this uncertainty through to the final revised abundance estimates. Our re-constructed abundance estimates were consistently higher and more uncertain than published estimates. The re-constructed estimates alter the conclusions reached for some sites in east Antarctica in recent assessments of long-term Adélie penguin population change. Our approach is applicable to abundance data for a wide range of colonial, land-breeding marine species including other penguin species, flying seabirds and marine mammals.

  7. Estimating costs associated with a community outbreak of meningococcal disease in a colombian Caribbean city.

    Science.gov (United States)

    Pinzón-Redondo, Hernando; Coronell-Rodriguez, Wilfrido; Díaz-Martinez, Inés; Guzmán-Corena, Angel; Constenla, Dagna; Alvis-Guzmán, Nelson

    2014-09-01

    Meningococcal disease is a serious and potentially life-threatening infection that is caused by the bacterium Neisseria meningitidis (N. meningitidis), and it can cause meningitis, meningococcaemia outbreaks and epidemics. The disease is fatal in 9-12% of cases and with a death rate of up to 40% among patients with meningococcaemia. The objective of this study was to estimate the costs of a meningococcal outbreak that occurred in a Caribbean city of Colombia. We contacted experts involved in the outbreak and asked them specific questions about the diagnosis and treatment for meningococcal cases during the outbreak. Estimates of costs of the outbreak were also based on extensive review of medical records available during the outbreak. The costs associated with the outbreak were divided into the cost of the disease response phase and the cost of the disease surveillance phase. The costs associated with the outbreak control and surveillance were expressed in US$ (2011) as cost per 1,000 inhabitants. The average age of patients was 4.6 years (SD 3.5); 50% of the cases died; 50% of the cases were reported to have meningitis (3/6); 33% were diagnosed with meningococcaemia and myocarditis (2/6); 50% of the cases had bacteraemia (3/6); 66% of the cases had a culture specimen positive for Neisseria meningitidis; 5 of the 6 cases had RT-PCR positive for N. meningitidis. All N. meningitidis were serogroup B; 50 doses of ceftriaxone were administered as prophylaxis. Vaccine was not available at the time. The costs associated with control of the outbreak were estimated at US$ 0.8 per 1,000 inhabitants, disease surveillance at US$ 4.1 per 1,000 inhabitants, and healthcare costs at US$ 5.1 per 1,000 inhabitants. The costs associated with meningococcal outbreaks are substantial, and the outbreaks should be prevented. The mass chemoprophylaxis implemented helped control the outbreak.

  8. Estimating Costs Associated with a Community Outbreak of Meningococcal Disease in a Colombian Caribbean City

    Science.gov (United States)

    Pinzón-Redondo, Hernando; Coronell-Rodriguez, Wilfrido; Díaz-Martinez, Inés; Guzmán-Corena, Ángel; Constenla, Dagna

    2014-01-01

    ABSTRACT Meningococcal disease is a serious and potentially life-threatening infection that is caused by the bacterium Neisseria meningitidis (N. meningitidis), and it can cause meningitis, meningococcaemia outbreaks and epidemics. The disease is fatal in 9-12% of cases and with a death rate of up to 40% among patients with meningococcaemia. The objective of this study was to estimate the costs of a meningococcal outbreak that occurred in a Caribbean city of Colombia. We contacted experts involved in the outbreak and asked them specific questions about the diagnosis and treatment for meningococcal cases during the outbreak. Estimates of costs of the outbreak were also based on extensive review of medical records available during the outbreak. The costs associated with the outbreak were divided into the cost of the disease response phase and the cost of the disease surveillance phase. The costs associated with the outbreak control and surveillance were expressed in US$ (2011) as cost per 1,000 inhabitants. The average age of patients was 4.6 years (SD 3.5); 50% of the cases died; 50% of the cases were reported to have meningitis (3/6); 33% were diagnosed with meningococcaemia and myocarditis (2/6); 50% of the cases had bacteraemia (3/6); 66% of the cases had a culture specimen positive for Neisseria meningitidis; 5 of the 6 cases had RT-PCR positive for N. meningitidis. All N. meningitidis were serogroup B; 50 doses of ceftriaxone were administered as prophylaxis. Vaccine was not available at the time. The costs associated with control of the outbreak were estimated at US$ 0.8 per 1,000 inhabitants, disease surveillance at US$ 4.1 per 1,000 inhabitants, and healthcare costs at US$ 5.1 per 1,000 inhabitants. The costs associated with meningococcal outbreaks are substantial, and the outbreaks should be prevented. The mass chemoprophylaxis implemented helped control the outbreak. PMID:25395916

  9. Identifying The Effective Factors for Cost Overrun and Time Delay in Water Construction Projects

    Directory of Open Access Journals (Sweden)

    D. Mirzai Matin

    2016-08-01

    Full Text Available Water construction projects in Iran frequently face problems which cause cost overrun and time delay, the two most common issues in construction projects in general. The objective of this survey is to identify and quantify these problems and thus help in avoiding them. This survey represents a collection of the most significant problems found in the literature, classified into 11 groups according to their source. The questionnaire form used contains 84 questions which were answered by random engineers who work in water construction projects. The Relative Importance Weight (RIW method is used to weight the importance of each one of the 84 problems. The focus of this survey is on overall top ten issues which are: bureaucracy in bidding method, inflation, economical condition of the government, not enough information gathered and surveys done before design, monthly payment difficulties, material cost changes, law changes by the government, financial difficulties, mode of financing and payment for completed work and changes made by the owner. A section for each of these issues provides additional information about them. In the full text of this survey the same weighting method is used to classify the main groups, and the results show that issues related to the groups of government, owner and consultant has the most significant impact. The last part of this survey describes the point of view of the engineers who took part in this survey and the recommendations they made.

  10. Risk Management of Construction Cost%工程造价的风险管理

    Institute of Scientific and Technical Information of China (English)

    王奎

    2011-01-01

    工程项目在施工过程中有着诸多的风险因素在内,其厉害关系到项目投资的直接效益.如果仅仅靠看一个不可确定性的数字作为工程造价的方法指标是不合理的.文章通过对工程造价的构成及特性做了阐述,并提出了较为合理的风险识别和控制程序.以达到工程造价风险的完整性和科学性,为项目的建设保证最终经济效益.%During construction, the project has a number of risk factors, including its stake to the investment of the direct benefits.It is not reasonable if we only look at a non-deterministic number as an indicator of the project cost.By the composition of the project cost and characteristics, more reasonable risk identification and control procedures are put forward in order to achieve a full scientific risk of project cost for construction of the project and ensure the ultimate economic benefits.

  11. Construction and Testing of Lightweight and Low-Cost Pneumatically Inflated Solar Concentrators

    Directory of Open Access Journals (Sweden)

    F. M. I. De Los Santos-García

    2016-01-01

    Full Text Available Design, construction, and evaluation of a cylindrical-trough solar concentrator with 1.3 m aperture, 2.15 m length, and 0.54 m focal length, with heat-pipe or vacuum tube receiver and one axis tracking system, are presented. Design performance was tested under ASHRAE standard 93-1986 (RA 91. The concentrator system is lightweight and inexpensive since it was made of polymeric membranes and was pneumatically inflated to acquire its cylindrical shape achieving good optical quality. Further implementation of a flat and a cylindrical extension of the concentrating mirror as secondary mirrors was incorporated into the concentrator design in order to compensate for seasonal variations of collected radiation. Total initial investment of $163.30 or $58.5/m2 and efficiencies ranging from 33 to 25% for 25 up to 65°C show an excellent cost-performance ratio. Construction, costs, and efficiencies obtained by us and developed by other groups are compared to emphasize the high cost/benefit ratio and efficiencies of this approach.

  12. Cost estimation when time and resources are limited: the Brief DATCAP.

    Science.gov (United States)

    French, Michael T; Roebuck, M Christopher; McLellan, A Thomas

    2004-10-01

    The Drug Abuse Treatment Cost Analysis Program (DATCAP) was designed in the early 1990s as a research guide to collect and analyze financial data from addiction treatment programs. The addiction research community could clearly benefit from a version of the DATCAP that reduced the time and effort required for its administration without compromising the integrity of its cost estimates. This paper introduces the Brief DATCAP and presents some preliminary findings. Initial feedback from respondents suggests that the Brief DATCAP is understandable, and easier and quicker to complete than the DATCAP. More importantly, preliminary results indicate that cost estimates from the Brief DATCAP differ from those of the longer DATCAP by less than 2%. These results have important research and policy implications because a shorter yet reasonably accurate cost instrument will enhance the feasibility and precision of future economic evaluations of addiction interventions.

  13. Discussion on engineering cost estimation%谈工程中的成本测算

    Institute of Scientific and Technical Information of China (English)

    2015-01-01

    Combining with working experience,the paper introduces building engineering cost elements under BOQ background,identifies cost estimation scope and principles,and analyzes cost estimation contents including labor,materials,machineries and measures,which has laid a foundation for cost control.%结合工作经验,介绍了建筑工程中定额及工程量清单计价背景下的成本要素,明确了成本测算的范围与原则,并对成本测算中人、材、机械、措施四大要素中常见的一些情况进行了分析,为成本的控制工作奠定了基础。

  14. State estimation and control for low-cost unmanned aerial vehicles

    CERN Document Server

    Hajiyev, Chingiz; Yenal Vural, Sıtkı

    2015-01-01

    This book discusses state estimation and control procedures for a low-cost unmanned aerial vehicle (UAV). The authors consider the use of robust adaptive Kalman filter algorithms and demonstrate their advantages over the optimal Kalman filter in the context of the difficult and varied environments in which UAVs may be employed. Fault detection and isolation (FDI) and data fusion for UAV air-data systems are also investigated, and control algorithms, including the classical, optimal, and fuzzy controllers, are given for the UAV. The performance of different control methods is investigated and the results compared. State Estimation and Control of Low-Cost Unmanned Aerial Vehicles covers all the important issues for designing a guidance, navigation and control (GNC) system of a low-cost UAV. It proposes significant new approaches that can be exploited by GNC system designers in the future and also reviews the current literature. The state estimation, control and FDI methods are illustrated by examples and MATLAB...

  15. Evaluation of the St. Lucia geothermal resource: engineering investigation and cost estimate

    Energy Technology Data Exchange (ETDEWEB)

    Altseimer, J.H.; Edeskuty, F.J.; Taylor, W.B.; Williamson, K.D. Jr.

    1984-08-01

    An engineering and economic study of the development of geothermal energy in St. Lucia has given cost estimates for electricity and process heat produced from the geothermal energy, identified additional industries that are worthy of further examination, and developed methods for examining the economic impact of this new energy source. Costs have been estimated for electricity produced from geothermal energy, by diesel engines used only during peak power demand, by diesel engines producing the total electricity requirement, by an oil-fired steam-power plant, and by a coal-fired steam-power plant. Costs have also been estimated for thermal energy to be used for industrial process heat under various conditions of transport distances, capacity factors, and temperature requirements. Several industries that may be attracted to St. Lucia by the development of geothermal energy have been identified.

  16. Estimation of the cost of treatment by chemotherapy for early breast cancer in Morocco

    Directory of Open Access Journals (Sweden)

    Boutayeb Saber

    2010-09-01

    Full Text Available Abstract Background Breast cancer is the first cancer in women both in incidence and mortality. The treatment of breast cancer benefited from the progress of chemotherapy and targeted therapies, but there was a parallel increase in treatment costs. Despite a relatively high incidence of many sites of cancer, so far, there is no national register for this disease in Morocco. The main goal of this paper is to estimate the total cost of chemotherapy in the early stages of breast cancer due to its frequency and the chances of patients being cured. This study provides health decision-makers with a first estimate of costs and the opportunity to achieve the optimal use of available data to estimate the needs of antimitotics and trastuzumab in Morocco. Method We start by evaluating the individual cost according to the therapeutic sub-groups, namely: 1. Patients needing chemotherapy with only anthracycline-based therapy. 2. Patients needing chemotherapy with both anthracycline and taxane but without trastuzumab. 3. Patients needing trastuzumab in addition to chemotherapy. For each sub-group, the protocol of treatment is described, and the individual costs per unit, and for the whole cycle, are evaluated. Then we estimate the number of women suffering from breast cancer on the basis of two data bases available in Morocco. Finally, we calculate the total annual cost of treatment of breast cancer in Morocco. Results The total cost of breast cancer in Morocco is given in Moroccan dirhams (MAD, the US dollar at the current exchange rate (MAD 10 = USD 1.30 and in international dollars or purchasing power parity (MAD 10 = PPP 1.95. The cost of a therapy with trastuzumab is 8.4 times the cost of a sequential chemotherapy combining anthracycline and taxane, and nearly 60 times the cost of chemotherapy based on anthracycline alone. Globally, between USD 13.3 million and USD 28.6 million need to be devoted every year by the Moroccan health authorities to treat

  17. Expanding ART for treatment and prevention of HIV in South Africa: estimated cost and cost-effectiveness 2011-2050.

    Directory of Open Access Journals (Sweden)

    Reuben Granich

    Full Text Available BACKGROUND: Antiretroviral Treatment (ART significantly reduces HIV transmission. We conducted a cost-effectiveness analysis of the impact of expanded ART in South Africa. METHODS: We model a best case scenario of 90% annual HIV testing coverage in adults 15-49 years old and four ART eligibility scenarios: CD4 count <200 cells/mm(3 (current practice, CD4 count <350, CD4 count <500, all CD4 levels. 2011-2050 outcomes include deaths, disability adjusted life years (DALYs, HIV infections, cost, and cost per DALY averted. Service and ART costs reflect South African data and international generic prices. ART reduces transmission by 92%. We conducted sensitivity analyses. RESULTS: Expanding ART to CD4 count <350 cells/mm(3 prevents an estimated 265,000 (17% and 1.3 million (15% new HIV infections over 5 and 40 years, respectively. Cumulative deaths decline 15%, from 12.5 to 10.6 million; DALYs by 14% from 109 to 93 million over 40 years. Costs drop $504 million over 5 years and $3.9 billion over 40 years with breakeven by 2013. Compared with the current scenario, expanding to <500 prevents an additional 585,000 and 3 million new HIV infections over 5 and 40 years, respectively. Expanding to all CD4 levels decreases HIV infections by 3.3 million (45% and costs by $10 billion over 40 years, with breakeven by 2023. By 2050, using higher ART and monitoring costs, all CD4 levels saves $0.6 billion versus current; other ART scenarios cost $9-194 per DALY averted. If ART reduces transmission by 99%, savings from all CD4 levels reach $17.5 billion. Sensitivity analyses suggest that poor retention and predominant acute phase transmission reduce DALYs averted by 26% and savings by 7%. CONCLUSION: Increasing the provision of ART to <350 cells/mm3 may significantly reduce costs while reducing the HIV burden. Feasibility including HIV testing and ART uptake, retention, and adherence should be evaluated.

  18. Estimating costs of low-level radioactive waste disposal alternatives for the Commonwealth of Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    1994-02-01

    This report was prepared for the Commonwealth of Massachusetts by the Idaho National Engineering Laboratory, National Low-Level Waste Management Program. It presents planning life-cycle cost (PLCC) estimates for four sizes of in-state low-level radioactive waste (LLRW) disposal facilities. These PLCC estimates include preoperational and operational expenditures, all support facilities, materials, labor, closure costs, and long-term institutional care and monitoring costs. It is intended that this report bc used as a broad decision making tool for evaluating one of the several complex factors that must be examined when deciding between various LLRW management options -- relative costs. Because the underlying assumptions of these analyses will change as the Board decides how it will manage Massachusett`s waste and the specific characteristics any disposal facility will have, the results of this study are not absolute and should only be used to compare the relative costs of the options presented. The disposal technology selected for this analysis is aboveground earth-mounded vaults. These vaults are reinforced concrete structures where low-level waste is emplaced and later covered with a multi-layered earthen cap. The ``base case`` PLCC estimate was derived from a preliminary feasibility design developed for the Illinois Low-Level Radioactive Waste Disposal Facility. This PLCC report describes facility operations and details the procedure used to develop the base case PLCC estimate for each facility component and size. Sensitivity analyses were performed on the base case PLCC estimate by varying several factors to determine their influences upon the unit disposal costs. The report presents the results of the sensitivity analyses for the five most significant cost factors.

  19. Cost Composition of Expressway Construction and Establishment of Cost Valuation Model%高速公路建设费用组成及造价估价模型建立

    Institute of Scientific and Technical Information of China (English)

    王芳; 刘凯; 王选仓; 杨育生

    2012-01-01

    In order to efficiently control and estimate expressway construction cost, taken the expressway construction cost in Shaanxi Province as research object, by using Matlab program and mathematical statistics and analysis method, the change regularity of individual project cost and its ratios to construction installation cost and total construction cost in different construction periods was obtained, and the valuation model of expressway cost was established. The research results indicate that ( 1 ) each individual project cost (suhgrade, pavement, bridge, tunnel, landscape, housing construction, traffic safety, electromechanical engineering and land acquisition) gradually increased over time; (2) the ratios of subgrade, bridge, and traffic safety costs to construction installation cost and total construction cost decreased, while the ratios of other individual project costs gradually increased. The valuation model reflected the quantitative relationship of cost per kilometer with subgrade width, average filling height of subgrade, total thickness of pavement structure, thickness of pavement surface course, ratio of bridge to tunnel, land acquisition area, length of landscape engineering and interchange number. The fitting of model can meet the accuracy requirement of project. The research results provided a decision-making basis for fast and accurately estimating and assessing construction cost and its reasonableness of new expressway project.%为有效控制和预估高速公路建设费用,以陕西省高速公路建设费用为研究对象,采用Matlab软件编程,通过数理统计与分析得出了不同建设时期各单项费用及其占建安费、总费用比例的变化规律,并建立了造价估价模型.研究结果表明:随着时间的推移,各单项费用(路基、路面、桥梁、隧道、绿化、房建、交通安全、机电、征地拆迁)逐渐增加;路基、桥梁、交通安全设施费用占建安费、总费用的比例减小;其他

  20. Green procurement of buildings: estimation of environmental impact and life-cycle cost

    OpenAIRE

    Sterner, Eva

    2002-01-01

    This thesis focuses on environmental impact reduction and life-cycle cost estimations in building procurement. The aim for the work presented in this thesis is to contribute to the understanding of whether costs and environmental impact of a building can be integrated in a, from the users perspective, practical model applied for tender evaluation. The model should also be able to use as a base of evaluating different solutions in the design phase. Specifically this means to: Increase knowledg...

  1. Application of Korean Specific Data to Economic Cost Estimation by KOSCA-MACCS2

    Energy Technology Data Exchange (ETDEWEB)

    Choi, Sun Yeong; Jang, Seung-Cheol [KAERI, Daejeon (Korea, Republic of)

    2015-05-15

    Default values for various data provided by MACCS2(MELCOR Accident Consequence Code System Version 2) such as population, weather, food, and economic cost are far from current domestic condition. In the case of economic cost data, related default values came from MACCS and WASH-1400. KAERI (Korea Atomic Energy Research Institute) has been developed a Korean-specific level 3 PSA (Probabilistic Safety Assessment) code package based on MACCS2 to reflect domestic condition for off-site consequence analysis. To this end, we performed a study on the domestic specific technical issues for level 3 PSA, which are a dose conversion factor, food chain model, atmospheric dispersion model, and domestic-specific economic effect model. Based on the study, we developed a level 3 PSA code, so-called KOSCAMACCS2 (Korean-specific Off-Site Consequence Analysis based on MACCS2). The purpose of this paper is to introduce economic cost variable provided by KOSCA-MACCS2 and application of Korean-specific data to the related economic cost estimation with KOSCA-MACCS2. In this paper, we introduced economic cost variable provided by KOSCA-MACCS2 and suggested the application plan of Korean-specific data to the related economic cost estimation. To this end, we considered data sources for those economic cost variables to reflect Korea-specific features such as data by Statistics Korea or Bank of Korea etc. For the decontamination related variables, we applied foreign literatures to apply data, which are Extern-E and UNESCO Chernobyl Forum data. Based on the data resources we estimated data for input variables related to economic cost estimation.

  2. Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup, and Oxygen Separation Equipment; Task 1: Cost Estimates of Small Modular Systems

    Energy Technology Data Exchange (ETDEWEB)

    Nexant Inc.

    2006-05-01

    This deliverable is the Final Report for Task 1, Cost Estimates of Small Modular Systems, as part of NREL Award ACO-5-44027, ''Equipment Design and Cost Estimation for Small Modular Biomass Systems, Synthesis Gas Cleanup and Oxygen Separation Equipment''. Subtask 1.1 looked into processes and technologies that have been commercially built at both large and small scales, with three technologies, Fluidized Catalytic Cracking (FCC) of refinery gas oil, Steam Methane Reforming (SMR) of Natural Gas, and Natural Gas Liquids (NGL) Expanders, chosen for further investigation. These technologies were chosen due to their applicability relative to other technologies being considered by NREL for future commercial applications, such as indirect gasification and fluidized bed tar cracking. Research in this subject is driven by an interest in the impact that scaling has on the cost and major process unit designs for commercial technologies. Conclusions from the evaluations performed could be applied to other technologies being considered for modular or skid-mounted applications.

  3. Early‐Stage Capital Cost Estimation of Biorefinery Processes: A Comparative Study of Heuristic Techniques

    Science.gov (United States)

    Couturier, Jean‐Luc; Kokossis, Antonis; Dubois, Jean‐Luc

    2016-01-01

    Abstract Biorefineries offer a promising alternative to fossil‐based processing industries and have undergone rapid development in recent years. Limited financial resources and stringent company budgets necessitate quick capital estimation of pioneering biorefinery projects at the early stages of their conception to screen process alternatives, decide on project viability, and allocate resources to the most promising cases. Biorefineries are capital‐intensive projects that involve state‐of‐the‐art technologies for which there is no prior experience or sufficient historical data. This work reviews existing rapid cost estimation practices, which can be used by researchers with no previous cost estimating experience. It also comprises a comparative study of six cost methods on three well‐documented biorefinery processes to evaluate their accuracy and precision. The results illustrate discrepancies among the methods because their extrapolation on biorefinery data often violates inherent assumptions. This study recommends the most appropriate rapid cost methods and urges the development of an improved early‐stage capital cost estimation tool suitable for biorefinery processes. PMID:27484398

  4. Early-Stage Capital Cost Estimation of Biorefinery Processes: A Comparative Study of Heuristic Techniques.

    Science.gov (United States)

    Tsagkari, Mirela; Couturier, Jean-Luc; Kokossis, Antonis; Dubois, Jean-Luc

    2016-09-08

    Biorefineries offer a promising alternative to fossil-based processing industries and have undergone rapid development in recent years. Limited financial resources and stringent company budgets necessitate quick capital estimation of pioneering biorefinery projects at the early stages of their conception to screen process alternatives, decide on project viability, and allocate resources to the most promising cases. Biorefineries are capital-intensive projects that involve state-of-the-art technologies for which there is no prior experience or sufficient historical data. This work reviews existing rapid cost estimation practices, which can be used by researchers with no previous cost estimating experience. It also comprises a comparative study of six cost methods on three well-documented biorefinery processes to evaluate their accuracy and precision. The results illustrate discrepancies among the methods because their extrapolation on biorefinery data often violates inherent assumptions. This study recommends the most appropriate rapid cost methods and urges the development of an improved early-stage capital cost estimation tool suitable for biorefinery processes. © 2015 The Authors. Published by Wiley-VCH Verlag GmbH & Co. KGaA.

  5. Benefit-cost estimation for alternative drinking water maximum contaminant levels

    Science.gov (United States)

    Gurian, Patrick L.; Small, Mitchell J.; Lockwood, John R.; Schervish, Mark J.

    2001-08-01

    A simulation model for estimating compliance behavior and resulting costs at U.S. Community Water Suppliers is developed and applied to the evaluation of a more stringent maximum contaminant level (MCL) for arsenic. Probability distributions of source water arsenic concentrations are simulated using a statistical model conditioned on system location (state) and source water type (surface water or groundwater). This model is fit to two recent national surveys of source waters, then applied with the model explanatory variables for the population of U.S. Community Water Suppliers. Existing treatment types and arsenic removal efficiencies are also simulated. Utilities with finished water arsenic concentrations above the proposed MCL are assumed to select the least cost option compatible with their existing treatment from among 21 available compliance strategies and processes for meeting the standard. Estimated costs and arsenic exposure reductions at individual suppliers are aggregated to estimate the national compliance cost, arsenic exposure reduction, and resulting bladder cancer risk reduction. Uncertainties in the estimates are characterized based on uncertainties in the occurrence model parameters, existing treatment types, treatment removal efficiencies, costs, and the bladder cancer dose-response function for arsenic.

  6. Alternative methods of marginal abatement cost estimation: Non- parametric distance functions

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, G.; Molburg, J. [Argonne National Lab., IL (United States). Decision and Information Sciences Div.; Prince, R. [USDOE Office of Environmental Analysis, Washington, DC (United States)

    1996-12-31

    This project implements a economic methodology to measure the marginal abatement costs of pollution by measuring the lost revenue implied by an incremental reduction in pollution. It utilizes observed performance, or `best practice`, of facilities to infer the marginal abatement cost. The initial stage of the project is to use data from an earlier published study on productivity trends and pollution in electric utilities to test this approach and to provide insights on its implementation to issues of cost-benefit analysis studies needed by the Department of Energy. The basis for this marginal abatement cost estimation is a relationship between the outputs and the inputs of a firm or plant. Given a fixed set of input resources, including quasi-fixed inputs like plant and equipment and variable inputs like labor and fuel, a firm is able to produce a mix of outputs. This paper uses this theoretical view of the joint production process to implement a methodology and obtain empirical estimates of marginal abatement costs. These estimates are compared to engineering estimates.

  7. Site restoration: Estimation of attributable costs from plutonium-dispersal accidents

    Energy Technology Data Exchange (ETDEWEB)

    Chanin, D.I.; Murfin, W.B. [Technadyne Engineering Consultants, Inc., Albuquerque, NM (United States)

    1996-05-01

    A nuclear weapons accident is an extremely unlikely event due to the extensive care taken in operations. However, under some hypothetical accident conditions, plutonium might be dispersed to the environment. This would result in costs being incurred by the government to remediate the site and compensate for losses. This study is a multi-disciplinary evaluation of the potential scope of the post-accident response that includes technical factors, current and proposed legal requirements and constraints, as well as social/political factors that could influence decision making. The study provides parameters that can be used to assess economic costs for accidents postulated to occur in urban areas, Midwest farmland, Western rangeland, and forest. Per-area remediation costs have been estimated, using industry-standard methods, for both expedited and extended remediation. Expedited remediation costs have been evaluated for highways, airports, and urban areas. Extended remediation costs have been evaluated for all land uses except highways and airports. The inclusion of cost estimates in risk assessments, together with the conventional estimation of doses and health effects, allows a fuller understanding of the post-accident environment. The insights obtained can be used to minimize economic risks by evaluation of operational and design alternatives, and through development of improved capabilities for accident response.

  8. Estimating the costs of school closure for mitigating an influenza pandemic

    Directory of Open Access Journals (Sweden)

    Adams Elisabeth J

    2008-04-01

    Full Text Available Abstract Background School closure is a key component of many countries' plans to mitigate the effect of an influenza pandemic. Although a number of studies have suggested that such a policy might reduce the incidence, there are no published studies of the cost of such policies. This study attempts to fill this knowledge gap Methods School closure is expected to lead to significant work absenteeism of working parents who are likely to be the main care givers to their dependent children at home. The cost of absenteeism due to school closure is calculated as the paid productivity loss of parental absenteeism during the period of school closure. The cost is estimated from societal perspective using a nationally representative survey. Results The results show that overall about 16% of the workforce is likely to be the main caregiver for dependent children and therefore likely to take absenteeism. This rises to 30% in the health and social care sector, as a large proportion of the workforce are women. The estimated costs of school closure are significant, at £0.2 bn – £1.2 bn per week. School closure is likely to significantly exacerbate the pressures on the health system through staff absenteeism. Conclusion The estimates of school closure associated absenteeism and the projected cost would be useful for pandemic planning for business continuity, and for cost effectiveness evaluation of different pandemic influenza mitigation strategies.

  9. Estimated cost of universal public coverage of prescription drugs in Canada

    Science.gov (United States)

    Morgan, Steven G.; Law, Michael; Daw, Jamie R.; Abraham, Liza; Martin, Danielle

    2015-01-01

    Background: With the exception of Canada, all countries with universal health insurance systems provide universal coverage of prescription drugs. Progress toward universal public drug coverage in Canada has been slow, in part because of concerns about the potential costs. We sought to estimate the cost of implementing universal public coverage of prescription drugs in Canada. Methods: We used published data on prescribing patterns and costs by drug type, as well as source of funding (i.e., private drug plans, public drug plans and out-of-pocket expenses), in each province to estimate the cost of universal public coverage of prescription drugs from the perspectives of government, private payers and society as a whole. We estimated the cost of universal public drug coverage based on its anticipated effects on the volume of prescriptions filled, products selected and prices paid. We selected these parameters based on current policies and practices seen either in a Canadian province or in an international comparator. Results: Universal public drug coverage would reduce total spending on prescription drugs in Canada by $7.3 billion (worst-case scenario $4.2 billion, best-case scenario $9.4 billion). The private sector would save $8.2 billion (worst-case scenario $6.6 billion, best-case scenario $9.6 billion), whereas costs to government would increase by about $1.0 billion (worst-case scenario $5.4 billion net increase, best-case scenario $2.9 billion net savings). Most of the projected increase in government costs would arise from a small number of drug classes. Interpretation: The long-term barrier to the implementation of universal pharmacare owing to its perceived costs appears to be unjustified. Universal public drug coverage would likely yield substantial savings to the private sector with comparatively little increase in costs to government. PMID:25780047

  10. Construction of low-cost, Mod-OA wood composite wind turbine blades

    Science.gov (United States)

    Lark, R. F.

    1983-01-01

    Two sixty-foot, low-cost, wood composite blades for service on 200 kW Mod-OA wind turbines were constructed. The blades were constructed of epoxy resin-bonded Douglas fir veneers for the leading edge sections, and paper honeycombcored, birch plywood faced panels for the afterbody sections. The blades were joined to the wind turbine hub by epoxy resin-bonded steel load take-off studs embedded into the root end of the blades. The blades were installed on the 200 kW Mod-OA wind turbine facility at Kahuku, Hawaii, The blades completed nearly 8,000 hours of operation over an 18 month period at an average power of 150 kW prior to replacement with another set of wood composite blades. The blades were replaced because of a corrosion failure of the steel shank on one stud. Inspections showed that the wood composite structure remained in excellent condition.

  11. Energy Efficient Low-Cost Virtual Backbone Construction for Optimal Routing in Wireless Sensor Networks

    Directory of Open Access Journals (Sweden)

    K. Mohaideen Pitchai

    2014-01-01

    Full Text Available Many prominent applications in wireless sensor networks which require collected information have to be routed to end nodes in an efficient manner. In general, weighted connected dominating Sets (WCDS based routing is a promising approach for enhancing the routing efficiency in sensor networks. Backbone has been used extensively in routing. Here an efficient WCDS algorithm for constructing a virtual backbone with low total cost, hop spanning ratio, and minimum number of dominators is proposed. We report a systematic approach, which has three phases. Initial phase considers the issues of revoking a partial CDS tree from a complete CDS tree. Secondary and final phases make the design of the complete algorithm by considering the determination of dominators using an iteration process. Our findings reveal better performance than the existing algorithms in terms of total cost, hop spanning ratio, and number of dominators.

  12. Reliability/Cost Evaluation on Power System connected with Wind Power for the Reserve Estimation

    DEFF Research Database (Denmark)

    Lee, Go-Eun; Cha, Seung-Tae; Shin, Je-Seok;

    2012-01-01

    Wind power is ideally a renewable energy with no fuel cost, but has a risk to reduce reliability of the whole system because of uncertainty of the output. If the reserve of the system is increased, the reliability of the system may be improved. However, the cost would be increased. Therefore...... the reserve needs to be estimated considering the trade-off between reliability and economic aspects. This paper suggests a methodology to estimate the appropriate reserve, when wind power is connected to the power system. As a case study, when wind power is connected to power system of Korea, the effects...

  13. Reduced Multivariate Polynomial Model for Manufacturing Costs Estimation of Piping Elements

    Directory of Open Access Journals (Sweden)

    Nibaldo Rodriguez

    2013-01-01

    Full Text Available This paper discusses the development and evaluation of an estimation model of manufacturing costs of piping elements through the application of a Reduced Multivariate Polynomial (RMP. The model allows obtaining accurate estimations, even when enough and adequate information is not available. This situation typically occurs in the early stages of the design process of industrial products. The experimental evaluations show that the approach is capable, with a low complexity, of reducing uncertainties and to predict costs with significant precision. Comparisons with a neural network showed also that the RMP performs better considering a set of classical performance measures with the corresponding lower complexity and higher accuracy.

  14. Standard practice: Estimating the cost-effectiveness of coordinated DSM programs

    Energy Technology Data Exchange (ETDEWEB)

    Hill, L.J.; Brown, M.A.

    1994-12-01

    The purpose of this document is to describe and illustrate a methodology for estimating the cost-effectiveness of coordinated demand-side management (DSM) programs, extending California {open_quotes}standard practice{close_quotes} to address the special evaluation challenges arising from these programs. A coordinated DSM program is one that is co-administered by a state or local government agency and a gas or electric utility. Although the primary subject of this document is coordinated low-income programs, the principles are easily extended to estimating the cost-effectiveness of all coordinated programs.

  15. Estimation of Reliability and Cost Relationship for Architecture-based Software

    Institute of Scientific and Technical Information of China (English)

    Hui Guan; Wei-Ru Chen; Ning Huang; Hong-Ji Yang

    2010-01-01

    In this paper, we propose a new method to estimate the relationship between software reliability and software development cost taking into account the complexity for developing the software system and the size of software intended to develop during the implementation phase of the software development life cycle. On the basis of estimated relationship, a set of empirical data has been used to validate the correctness of the proposed model by comparing the result with the other existing models. The outcome of this work shows that the method proposed here is a relatively straightforward one in formulating the relationship between reliability and cost during implementation phase.

  16. Conceptual capital-cost estimate and facility design of the Mirror-Fusion Technology Demonstration Facility

    Energy Technology Data Exchange (ETDEWEB)

    1982-09-01

    This report contains contributions by Bechtel Group, Inc. to Lawrence Livermore National Laboratory (LLNL) for the final report on the conceptual design of the Mirror Fusion Technology Demonstration Facility (TDF). Included in this report are the following contributions: (1) conceptual capital cost estimate, (2) structural design, and (3) plot plan and plant arrangement drawings. The conceptual capital cost estimate is prepared in a format suitable for inclusion as a section in the TDF final report. The structural design and drawings are prepared as partial inputs to the TDF final report section on facilities design, which is being prepared by the FEDC.

  17. Principles Developed for the Construction of the High Performance, Low-cost Superconducting LHC corrector Magnets

    CERN Document Server

    Allitt, M; Ijspeert, Albert; Karppinen, M; Mazet, J; Pérez, J; Salminen, J; Karmarkar, M; Puntambekar, A

    2002-01-01

    The Large Hadron Collider (LHC) needs more than 6000 superconducting corrector magnets. These must be sufficiently powerful, have enough margin, be compact and of low cost. The development of the 11 types of magnets was spread over several years and included the magnetic and mechanical design as well as prototype building and testing. It gradually led to the systematic application of a number of interesting construction principles that allow to realize the above mentioned goals. The paper describes the techniques developed and presently used in practically all the LHC corrector magnets ranging from dipoles to dodecapoles.

  18. Investigating the possibility of constructing low cost roller compacted concrete dam

    Directory of Open Access Journals (Sweden)

    Mohamed I. Abu-Khashaba

    2014-03-01

    Results clarified how FA interacts with Portland cement and showed its effect on concrete properties especially strength development ratio. FA long-term reaction refines the pore concrete structure to reduce water ingress and control its seepage. FA reduces the thermal stresses by reducing the concrete hydration heat and reduces temperature-related cracking due to low early young’s modulus and finally leads to durability improvement that minimizes the dam construction cost. Results indicated that RCCD could be effectively implemented with site local Egyptian materials. However, more further field measurements and a RCCD prototype are required to be examined analytically and verified with in situ data to evaluate that technique.

  19. A GENETIC ALGORITHM FOR CONSTRUCTING BROADCAST TREES WITH COST AND DELAY CONSTRAINTS IN COMPUTER NETWORKS

    Directory of Open Access Journals (Sweden)

    Ahmed Y. Hamed

    2015-01-01

    Full Text Available We refer to the problem of constructing broadcast trees with cost and delay constraints in the networks as a delay-constrained minimum spanning tree problem in directed networks. Hence it is necessary determining a spanning tree of minimal cost to connect the source node to all nodes subject to delay constraints on broadcast routing. In this paper, we proposed a genetic algorithm for solving broadcast routing by finding the low-cost broadcast tree with minimum cost and delay constraints. In this research we present a genetic algorithm to find the broadcast routing tree of a given network in terms of its links. The algorithm uses the connection matrix of the given network to find the spanning trees and considers the weights of the links to obtain the minimum spanning tree. Our proposed algorithm is able to find a better solution, fast convergence speed and high reliability. The scalability and the performance of the algorithm with increasing number of network nodes are also encouraging.

  20. A multi-objective genetic algorithm model for time-cost trade-off analysis of construction projects

    OpenAIRE

    Senouci, Ahmed; Al-Derham, Hassan R.

    2006-01-01

    Time-cost trade-off analysis is one of the most important aspects of construction project planning and control. There are trade-offs between time and cost to complete the activities of a project. Existing methods for time-cost trade-off analysis are not efficient enough to solve large-scale CPM networks (hundreds of activities or more). This paper presents an advanced and robust multi-objective genetic algorithm model for the time-cost trade-off analysis of construction projects. The model al...