  1. Origins, and the construction, commissioning and operation of the SRS

    International Nuclear Information System (INIS)

    Thompson, D.J.

    1985-01-01

    The SRS was initiated in 1973 and approved in 1975. It came into use in 1981. The paper describes the organizational framework at the different stages, the pre-approval, construction, commissioning and operational phases of the storage ring, the build-up of experimental stations, and future plans. The emphasis is on lessons which can be learned by those about to embark on such a project, rather than on a detailed historical account, and on managerial rather than physics matters

  2. Commissioning and Operational Experience in Power Reactor Fuel Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Pradhan, S., E-mail: spradhan@barctara.gov.in [Tarapur Based Reprocessing Plant, Bhabha Atomic Research Centre, Tarapur (India)

    2014-10-15

    After completing design, construction, commissioning, operation and maintenance experience of the reprocessing plants at Tarapur, Mumbai and Kalpakkam a new reprocessing plant is commissioned and put into operation at BARC, Tarapur since 2011. Subsequent to construction clearance, commissioning of the plant is taken in many steps with simultaneous review by design and safety committees. In spite of vast experience, all the staff was retrained in various aspects of process and utility operations and in operation of innovative changes incorporated in the design. Operating personnel are licensed through an elaborate procedure consisting of various check lists followed by personnel interview. Commissioning systems were divided in sub-systems. Sub-systems were commissioned independently and later integrated testing was carried out. For commissioning, extreme operating conditions were identified in consultation with designers and detailed commissioning procedures were made accordingly. Commissioning was done in different conditions to ensure safety, smooth operation and maintainability. Few modifications were carried out based on commissioning experience. Technical specifications for operation of the plant are made in consultation with designers and reviewed by safety committees. Operation of the plant was carried out after successful commissioning trials with Deep Depleted Uranium (DDU). Emergency operating procedures for each design basis accident were made. Performance of various systems, subsystems are quite satisfactory and the plant has given very good capacity factor. (author)

  3. SSCL Commissioning and Operations

    International Nuclear Information System (INIS)

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  4. Licensing of the OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.

    2007-01-01

    This paper presents a description of the licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) OPAL reactor. It addresses the Construction Licence, the interface between ANSTO, INVAP (the contractor with responsibility for design and construction of the facility) and the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA, the Australian nuclear regulator) during the construction of OPAL, specific licensing issues that have arisen during the construction and commissioning process, and the Operating Licence Application. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators

  5. A Public Commissioning Maturity Model for Construction Clients

    NARCIS (Netherlands)

    Hermans, M.H.; Volker, L.; Eisma, P.R.

    2014-01-01

    Being a public organization with construction needs, whether they are housing, building or infrastructure related, implies close co-operation and interaction with the supply chain. Substantial research exists that focuses on project related aspects of commissioning and on the role of the

  6. Licensing of ANSTO'S OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Ordonez, J.P.

    2006-01-01

    Full text: This paper presents a general description of the ongoing licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) Open Pool Australian Light-water (OPAL) Reactor at their Lucas Heights site. It addresses the following aspects: The Construction Licence - what it is and what impact it had on the construction of the OPAL Reactor, specifically the various Construction Licence Conditions; The interface between ANSTO, INVAP and ARPANSA during the construction of the OPAL Reactor, particularly in relation to ARPANS Regulation 54; Specific licensing issues that have arisen during the construction and commissioning process and how they have been resolved; The Operating Licence Application - what it is and how it interfaces with the construction and commissioning of the OPAL Reactor. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators. Note that this paper is an update of a presentation given at IGORR10 and follows on from a paper previously presented at PNBC12 in October 2002

  7. The Spallation Neutron Source Beam Commissioning and Initial Operations

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, Stuart [Argonne National Lab. (ANL), Argonne, IL (United States); Aleksandrov, Alexander V. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Allen, Christopher K. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Assadi, Saeed [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bartoski, Dirk [University of Texas, Houston, TX (United States). Anderson Cancer Center; Blokland, Willem [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Casagrande, F. [Michigan State Univ., East Lansing, MI (United States); Campisi, I. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Chu, C. [Michigan State Univ., East Lansing, MI (United States); Cousineau, Sarah M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Crofford, Mark T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Danilov, Viatcheslav [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Deibele, Craig E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dodson, George W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Feshenko, A. [Inst. for Nuclear Research (INR), Moscow (Russian Federation); Galambos, John D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Han, Baoxi [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hardek, T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Holmes, Jeffrey A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Holtkamp, N. [SLAC National Accelerator Lab., Menlo Park, CA (United States); Howell, Matthew P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Jeon, D. [Inst. for Basic Science, Daejeon (Korea); Kang, Yoon W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kasemir, Kay [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kim, Sang-Ho [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kravchuk, L. [Institute for Nuclear Research (INR), Moscow (Russian Federation); Long, Cary D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); McManamy, T. [McManamy Consulting, Inc., Middlesex, MA (United States); Pelaia, II, Tom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Piller, Chip [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Plum, Michael A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pogge, James R. [Tennessee Technological Univ., Cookeville, TN (United States); Purcell, John David [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Shea, T. [European Spallation Source, Lund (Sweden); Shishlo, Andrei P [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sibley, C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stockli, Martin P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stout, D. [Michigan State Univ., East Lansing, MI (United States); Tanke, E. [European Spallation Source, Lund (Sweden); Welton, Robert F [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Zhang, Y. [Michigan State Univ., East Lansing, MI (United States); Zhukov, Alexander P [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    The Spallation Neutron Source (SNS) accelerator delivers a one mega-Watt beam to a mercury target to produce neutrons used for neutron scattering materials research. It delivers ~ 1 GeV protons in short (< 1 us) pulses at 60 Hz. At an average power of ~ one mega-Watt, it is the highest-powered pulsed proton accelerator. The accelerator includes the first use of superconducting RF acceleration for a pulsed protons at this energy. The storage ring used to create the short time structure has record peak particle per pulse intensity. Beam commissioning took place in a staged manner during the construction phase of SNS. After the construction, neutron production operations began within a few months, and one mega-Watt operation was achieved within three years. The methods used to commission the beam and the experiences during initial operation are discussed.

  8. Construction and commissioning experience of evolutionary water cooled nuclear power plants

    International Nuclear Information System (INIS)

    2004-04-01

    Electricity market liberalization is an established fact in several countries and there is a trend to adopt it in other countries. The essential aim of market liberalization is to improve the overall economic efficiency. In order that nuclear power remains a viable option for electricity generation, its costs should be competitive with alternative sources while, at the same time, it should have a safe and reliable operation record. The capital cost of nuclear power plants (NPPs) generally accounts for 43-70% of the total nuclear electricity generation costs, compared to 26-48% for coal plants and 13-32% for gas plants. Most of these expenditures are incurred during the construction phase of a NPP. The achievement of shorter construction periods using improved technology and construction methods has a significant benefit on the costs incurred prior to any production of electricity. This document is intended to make the recent worldwide experience on construction and commissioning of evolutionary water cooled NPPs available to Member States and especially to those with nuclear power plants under construction/planning, and to those seriously considering nuclear power projects in the future. The final aim is to assist utilities and other organizations in Member States to improve the construction of nuclear power plants and achieve shortened schedules and reduced costs without compromising quality and safety. This document aims to provide an overview of the most advanced technologies, methods and processes used in construction and commissioning of recent nuclear projects. To better achieve this objective the presentation is selectively focused more on the new developments rather than providing a full review of all issues related to construction and commissioning. The experience described in this TECDOC applies to managers, engineers, supervisors, technicians and workers in various organizations dealing with the site construction and commissioning of nuclear power plants

  9. Experience with the use of building commissioning advisor - from design to operation

    DEFF Research Database (Denmark)

    Forman, Marianne

    2016-01-01

    The increased focus on building energy performance has intensified the need to ensure consistency between energy requirements, design, construction processes and operation in construction projects. With the introduction of the new Danish DS 3090 standard, "The commissioning process in buildings...... on ethnographic methods and theories, this paper will analyse and discuss what the use of a commissioning adviser in the design stage means for the interaction between design and operation. It may seem that "technical solutions" are made before “ongoing learning processes” in which new themes are articulated...

  10. Challenges encountered during an accelerated cogeneration plant construction and commissioning schedule

    International Nuclear Information System (INIS)

    Good, R.L.; Cox, T.P.; Vallejo, J.M.

    1988-01-01

    A decision was made in 1986 to proceed with a 110 magawatt grassroots cogeneration plant to supply the steam and electrical requirements of a large, integrated petrochemical manufacturing facility. Though some preliminary engineering had been done and long delivery equipment purchase orders had been let in the summer of 1986, detailed engineering did not commence until late October and construction until mid-December, 1986. Federal income tax consideration required that the project be in service prior to the end of 1987. This eleven month construction, commissioning, and start up schedule was achieved with 100 per cent operation occurring on December 22, 1987. Numerous challenges were met by the lean Project Team during this accelerated schedule. This paper discusses the development of: Project Team Staffing, Operator and Maintenance Staffing and Training, Commissioning Schedules and Staffing, solutions to Significant Technical Problems

  11. Construction, commissioning and initial operation of 2400W refrigerator and cold test stand for CDM testing

    International Nuclear Information System (INIS)

    Dubbs, J.D.; Kreinbrink, K.

    1994-01-01

    Air Products and CVI collaborated to design, construct and commission a refrigerator, test stands and integrated control system for the General Dynamics Collider Dipole Magnet Cold Test Facility (CTF) in Hammond, LA. The original project schedule required the cold test facility to be operational within 17 months of the notice to proceed. Midway through the project, changes in General Dynamics magnet testing requirements necessitated doubling the plant capacity, but the on stream date for the initial capacity increment could not be relaxed. The Air Products/CVI team had to adapt the project execution strategy to mitigate the schedule impact of the expansion in a cost effective manner without impacting system functionality, quality or safety. An equally challenging aspect of the job was that the (CTF) was being designed while several major systems that would interface with the CTF were being engineered. General Dynamics, Air Products and CVI had to work very closely to manage the interface issues. The teams efforts were very successful. The Hammond refrigerator/liquifier was started up on schedule. The first two test stands are currently being commissioned and will be on stream just six weeks later than the pre-expansion schedule target and all four test stands will be operational in time to support General Dynamics magnet testing requirements

  12. Problems and experience of regulatory review associated with plant construction and commissioning

    International Nuclear Information System (INIS)

    Commander, W.

    1979-01-01

    The work of the Assessment Branch of NII covering the regulatory review during design safety assessment, construction, commissioning and operation is described commencing with the nuclear licensing procedure through licence variations and conditions attached to the licence, to the final stages of plant construction up to commercial operation and full power production. The importance of the application of safety assessment principles is outlined, the importance of the Safety Inspectorate Schedule described, and the need to retain organisational and regulatory flexibility emphasised. (author)

  13. Emergency operation procedure navigation to avoid commission errors

    International Nuclear Information System (INIS)

    Gofuku, Akio; Ito, Koji

    2004-01-01

    New types of operation control system equipped with a large screen and CRT-based operation panels have been installed in newly constructed nuclear power plants. The operators can share important information of plant conditions by the large screen. The operation control system can know the operations by operators through the computers connected to the operation panels. The software switches placed in the CRT-based operation panels have a problem such that operators may make an error to manipulate an irrelevant software switch with their current operation. This study develops an operation procedure navigation technique to avoid this kind of commission errors. The system lies between CRT-based operation panels and plant control systems and checks an operation by operators if it follows the operation procedure of operation manuals. When the operation is a right one, the operation is executed as if the operation command is directly transmitted to control systems. If the operation does not follow the operation procedure, the system warns the commission error to operators. This paper describes the operation navigation technique, format of base operation model, and a proto-type operation navigation system for a three loop pressurized water reactor plant. The validity of the proto-type system is demonstrated by the operation procedure navigation for a steam generator tube rupture accident. (author)

  14. SYSTEM OF STANDARTIZATION OF CONSTRUCTION OPERATIONS ARRANGEMENT

    Directory of Open Access Journals (Sweden)

    Oleynik Pavel Pavlovich

    2012-10-01

    Full Text Available In the proposed article, management of construction operations is represented as a multi-level system; it is considered with the framework of projects including new construction, restructuring and overhaul of buildings and structures. The system of management of construction operations is to be composed of the following three constituent parts. They include a construction and assembling entity, project and operations, and a procurement base. Such matters as the quality of construction products, purchase (lease of building machinery and vehicles are incorporated into the level of the construction and assembling entity. The project level comprises such components of construction operations management as pre-construction preparation of a project, methods and forms of construction management, preparatory works, management of construction activities, real-time operations control, construction quality control, etc. The level of operations and the procurement base covers the needs for materials and equipment, their purchase and procurement, as well as the warehouse management. The main elements of the standardization system are identified. Standards of construction operations management are explained, including 1. General Provisions; 2. Preparation and performance of construction and assembling works; 3. New construction. Building site organization; 4. Demolition (dismantling of buildings and structures; 5. Rules of preparation for acceptance and commissioning of completed residential buildings. The prospects for the further development of the system of standardization of construction operations management are outlined

  15. Construction and commissioning of the Hinkley Point 'B' and Hunterston 'B' boilers

    International Nuclear Information System (INIS)

    White, D.C.; Holmes, R.L.

    1977-01-01

    Prior to construction and erection of the reactor boiler units, within the concrete pressure vessel, the units were received from the manufacturing works, and stored in clean and humidity controlled conditions. Because of the loading facilities into the reactor pressure vessel, a very precise erection procedure had to be adhered to. The activities associated with construction of feedwater inlet, superheater steam, and reheated steam inlet and outlet penetrations had to be programmed accordingly. By the very nature of the work load, the time scale involved, and the prime need to maintain the boiler unit materials free of deterioration from atmospheric corrosion after erection, early commissioning of storage systems were implemented; providing wet or dry storage conditions as dictated by the two Generating Boards. Pre-operational commissioning also covered the work of setting up all the steam and water controls, isolating valve systems and the automatic and sequence equipment associated with the feed water controls which are a major design feature of the once through boiler operation. (author)

  16. Jules Horowitz Reactor: Organisation for the Preparation of the Commissioning Phase and Normal Operation

    Energy Technology Data Exchange (ETDEWEB)

    Estrade, J.; Fabre, J. L.; Marcille, O. [French Alternative Energies end Atomic Energy Commission, Provence (France)

    2013-07-01

    The Jules Horowitz Reactor (JHR) is a new modern Material Testing Reactor (MTR) currently under construction at CEA Cadarache research centre in the south of France. It will be a major research facility in support to the development and the qualification of materials and fuels under irradiation with sizes and environment conditions relevant for nuclear power plants in order to optimise and demonstrate safe operations of existing power reactors as well as to support future reactors design. It will represent also an important research infrastructure for scientific studies dealing with material and fuel behaviour under irradiation. The JHR will contribute also to secure the production of radioisotope for medical application. This is a key public health stake. The construction of JHR which started in 2007 is going-on with target of commissioning by the end of 2017. The design of the reactor provides modern experimental capacity in support to R and D programs for the nuclear energy for the next 60 years. In parallel to the facility construction, the preparation of the future staff and of the organisation to operate the reactor safely, reliably and efficiently is an important issue. In this framework, many actions are in progress to elaborate: Ο the staffing and the organisational structure for the commissioning test phases and also for normal operation, Ο the documentation in support to the reactor operation (safety analysis report, general operating rules, procedures, instructions, ···), Ο the maintenance, in service and periodic test programs, Ο staff training programs by using dedicated facilities (simulator, ···) Ο commissioning test programs for ensuring that the layout of systems and subcomponents is completed in accordance with the design requirements, the specification performances and the safety criteria. These commissioning tests will also be helpful for transferring the knowledge on the installed systems to the operating group. This paper gives the

  17. The design, construction, commissioning and operation of a plant at Dounreay to dispose of sodium from KNKII

    International Nuclear Information System (INIS)

    Bowser, R.; Farquhar, J.; Currie, R.

    1997-01-01

    In a competitive bidding exercise, AEA Technology at Dounreay won a contract to dispose of 88 tonnes of fast reactor sodium from the KNKII reactor at KarIsruhe, Germany. This sodium comprises of 36 tonnes of 'primary' sodium containing traces of caesium-137 and sodium-22 and 52 tonnes of lightly tritiated 'secondary' sodium. The sodium has been transported solid to Dounreay in 200 litre drums. To fulfil this contract a sodium disposal plant has been designed, constructed, commissioned and put into operation. Following an option study, an aqueous reaction plant design was selected. In this process, sodium is reacted with aqueous caustic soda, producing hydrogen gas and more caustic soda. The hydrogen is diluted with air and vented to atmosphere, and the caustic is neutralised with hydrochloric acid before discharge to the site low-active drain. All effluents - gaseous or liquid - are filtered and treated to remove as much radioactivity as possible before discharge. The main reasons for choosing this design option were that the process was well proven, the reaction is easily controlled by controlling the supply of sodium into the reaction vessel, reaction temperatures are relatively low and the effluent can be easily prepared for discharge. It was also felt that an aqueous reaction plant could be designed to be operated remotely by one operator. The sodium in the drums is melted in a sodium melting station and then drained to a sodium buffer tank, prior to being injected into the reaction vessel. By collecting sodium in the buffer tank, sodium melting can proceed in parallel with sodium disposal allowing a high throughput to be achieved. This plant has been designed to dispose of 100 kg of sodium per hour, requiring a small operating team, suitably shielded from the radiological hazard. The design also ensures that the rate of reaction is controlled and that the effluent discharged to the low-active drain has been properly neutralised. The construction was performed

  18. Construction and Commissioning of PAL-XFEL Facility

    Directory of Open Access Journals (Sweden)

    In Soo Ko

    2017-05-01

    Full Text Available The construction of Pohang Accelerator Laboratory X-ray Free-Electron Laser (PAL-XFEL, a 0.1-nm hard X-ray free-electron laser (FEL facility based on a 10-GeV S-band linear accelerator (LINAC, is achieved in Pohang, Korea by the end of 2016. The construction of the 1.11 km-long building was completed by the end of 2014, and the installation of the 10-GeV LINAC and undulators started in January 2015. The installation of the 10-GeV LINAC, together with the undulators and beamlines, was completed by the end of 2015. The commissioning began in April 2016, and the first lasing of the hard X-ray FEL line was achieved on 14 June 2016. The progress of the PAL-XFEL construction and its commission are reported here.

  19. Large Hadron Collider commissioning and first operation.

    Science.gov (United States)

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  20. Experiences in commissioning and in the first operating cycle of GKN-II

    International Nuclear Information System (INIS)

    Grauf, E.; Zaiss, W.; Tschannerl, J.

    1990-01-01

    In 1989, after only four and a half years of construction, the second unit of the Neckar Joint Nuclear Power Station (GKN-II) was commissioned as the third convoy type nuclear power plant. Its gross power of 1314 MWe makes the pressurized water reactor of GKN-II a unit in the highest power category so far of Siemens/KWU. Delivery to the operators ahead of schedule and observance of the budget are conclusive proof of the advantages of the convoy principle. In addition, GKN-II was able to benefit from the experience accumulated in the construction and commissioning of the two earlier convoy plants. This was reflected in the speedy completion, without major disturbances, of the warranty tests and the trial period of operation. It also has an impact on power operation, the first cycle of which showed the plant to have an availability of 100% throughout and is considered to be a full success by the operators. A special feature of GKN-II is the hybrid cooling tower ensuring that no heated cooling water is returned from the plant into the Neckar river. (orig.) [de

  1. Construction, commissioning and operational experience of the Advanced Photon Source (APS) linear accelerator

    International Nuclear Information System (INIS)

    White, M.; Arnold, N.; Berg, W.

    1996-01-01

    The Advanced Photon Source linear accelerator system consists of a 200 MeV, 2856 MHz S-Band electron linac and a 2-radiation-thick tungsten target followed by a 450 MeV positron linac. The linac system has operated 24 hours per day for the past year to support accelerator commissioning and beam studies and to provide beam for the user experimental program. It achieves the design goal for positron current of 8 mA and produces electron energies up to 650 MeV without the target in place. The linac is described and its operation and performance are discussed

  2. Construction, commissioning and operational experience of the Advanced Photon Source (APS) linear accelerator

    International Nuclear Information System (INIS)

    White, M.; Arnold, N.; Berg, W.; Cours, A.; Fuja, R.; Grelick, A. E.; Sereno, N.; Wesolowski, W.; Ko, K.; Qian, Y.L.; Russell, T.

    1996-01-01

    The Advanced Photon Source linear accelerator system consists of a 200-MeV, 2856-MHz S-band electron linac and a 2-radiation-thick tungsten target followed by a 450-MeV positron linac. The linac system has operated 24 hours per day for the past year to support accelerator commissioning and beam studies and to provide beam for the user experimental program. It achieves the design goal for positron current of 8 mA and produces electron energies up to 650 MeV without the target in place. The linac is described and its operation and performance are discussed. (author)

  3. Experience in commissioning and scientific support of nuclear power plant operation in the German Democratic Republic

    International Nuclear Information System (INIS)

    Ackermann, G.; Endler, A.; Loth, K.H.

    1983-01-01

    In the German Democratic Republic two nuclear power plants equipped with four pressurized-water WWER-440-type reactors were commissioned in the years 1973-1979 and have since been in routine operation. The nuclear power plants (NPPs) in the GDR were constructed on the basis of projects developed and tested in the Soviet Union. Their main equipment was also supplied by the USSR. Under the technical supervision of USSR scientific institutions and design organizations, the construction, commissioning and operation of NPPs had to be prepared and organized by the design organizations, scientific institutions and the prospective user in the German Democratic Republic. To this effect, and to ensure nuclear safety, availability and maximum exploitation of nuclear fuel, it was necessary to develop national scientific capacities. The organizations of the USSR supply basic and supplementary documents prescribing the required extent of investigations to prove that the equipment and systems will meet the projected and operational conditions from loading to commercial operation. Concrete test programmes for commissioning and operational instructions are elaborated by national organizations. Pre-operational and initial startup tests are performed by the personnel of the plant, of enterprises and scientific institutions under the technical supervision of the design organizations of the USSR and the German Democratic Republic. Proceeding from experience gained for more than 15 years in the scientific support of commissioning and operation, the required training and disciplines of personnel are reported. The tasks to be met by the various disciplines are described. Furthermore, information is given on the main stages of commissioning and on a number of results. Finally, selected results of work in connection with operational assistance are reported

  4. NSLS-II injector commissioning and initial operation

    Energy Technology Data Exchange (ETDEWEB)

    Bacha, B.; Blum, E.; Bassi, B.; Bengtsson, J.; Blednykh, A.; Buda, S.; Cheng, W.; Choi, J.; Cuppolo, J.; D Alsace, R.; Davidsaver, M.; DeLong, J.; Doom, L.; Durfee, d.; fliller, R.; Fulkerson, M.; Ganetis, G.; Gao, F.; Gardner, C.; Guo, W.; Heese, R.; Hidaka, Y.; Hu, Y.; Johanson, M.; Kosciuk, B.; Kowalski, S.; Dramer, S.; Krinsky, S.; Li, Y.; Louie, W.; Maggipinto, M.; Marino, P.; Mead, J.; Oliva, G.; Padrazo, D.; Pedersen, K.; Podobedov, B.; Rainer, R.; Rose, J.; Santana, M.; Seletskiy, S.; Shaftan, T.; Singh, O.; Singh, P.; Smalyuk, V.; Smith, R.; Summers, T.; Tagger, J.; Tian, Y.; Wahl, W.; Wang, G.; Weiner, G.; Willeke, F.; Yang, L.; Yang, X.; Zeitler, E.; Zitvogel, E.; Zuhoski, P.

    2015-05-03

    The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

  5. Experience from construction and operation of Karachi nuclear power plant

    International Nuclear Information System (INIS)

    Zaidi, S.M.N.

    1977-01-01

    Pakistan's first nuclear power plant (KANUPP) is owned and operated by the Pakistan Atomic Energy Commission (PAEC). It uses a heavy water moderated and cooled natural uranium fuelled reactor. Total installed capacity is 137 MW(e). It was designed, constructed and commissioned by Canadian General Electric Co. Ltd. (CGE) as Prime Contractor. Construction started in mid-1966 and was completed in mid 1970; commissioning started in early 1970 and was completed at the end of 1972. Intensive on-the-job training for 20 engineers and 15 operators was provided by CGE in Canada. Ten engineers also worked in CGE's design offices. With this key group of engineers and technicians PAEC had no difficulty in taking over the plant from CGE after completion. The construction of the plant in a developing country presented special problems to CGE. The relatively small local construction firms had limited experience and equipment. Construction plant, equipment and tools were scarce. Fabrication and workshop facilities of limited scope were available but their quotations were relatively high. A scarcity of engineering, technical and skilled manpower for the construction of the project left as the only alternative on-site training for carefully recruited technicians. The results were most gratifying and compared favourably with CGE's Canadian experience. Welding, pipe fitting, tubing work and electrical connections were excellent. The local staff's productivity and dedication were very good. In the commissioning period, PAEC and CGE engineers and technicians worked as one team, testing and debugging the equipment and systems and demonstrating the contractual performance warranties. This period extended to approximately three years due to many technical problems resulting from equipment failures, environmental problems, system problems, plant loading limitations in view of the relatively small size of the grid system and special requirement of fuel conditioning to avoid premature fuel

  6. Safety of Nuclear Power Plants: Commissioning and Operation

    International Nuclear Information System (INIS)

    2011-01-01

    The safety of a nuclear power plant is ensured by means of proper site selection, design, construction and commissioning, and the evaluation of these, followed by proper management, operation and maintenance of the plant. In a later phase, a proper transition to decommissioning is required. The organization and management of plant operations ensures that a high level of safety is achieved through the effective management and control of operational activities. This publication is a revision of the Safety Requirements publication Safety of Nuclear Power Plants: Operation, which was issued in 2000 as IAEA Safety Standards Series No. NS-R-2. The purpose of this revision was to restructure Safety Standards Series No. NS-R-2 in the light of new operating experience and new trends in the nuclear industry; to introduce new requirements that were not included in Safety Standards Series No. NS-R-2 on the operation of nuclear power plants; and to reflect current practices, new concepts and technical developments. This update also reflects feedback on the use of the standards, both from Member States and from the IAEA's safety related activities. The publication is presented in the new format for Safety Requirements publications. The present publication reflects the safety principles of the Fundamental Safety Principles. It has been harmonized with IAEA Safety Standards Series No. GS-R-3 on The Management System for Facilities and Activities. Guidance on the fulfilment of the safety requirements is provided in supporting Safety Guides. The terminology used in this publication is defined and explained in the IAEA Safety Glossary. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the safety objective and safety principles that are established in the Fundamental Safety Principles. This

  7. Integrated safety analysis to operate while constructing Urenco USA

    International Nuclear Information System (INIS)

    Kohrt, Rick; Su, Shiaw-Der; Lehman, Richard

    2013-01-01

    The URENCO USA (UUSA) site in Lea County, New Mexico, USA is authorized by the U.S. Nuclear Regulatory Commission (NRC) for construction and operation of a uranium enrichment facility under 10 CFR 70 (Ref 1). The facility employs the gas centrifuge process to separate natural uranium hexafluoride (UF 6 ) feed material into a product stream enriched up to 5% U-235 and a depleted UF 6 stream containing approximately 0.2 to 0.34% U-235. Initial plant operations, with a limited number of cascades on line, commenced in the second half of 2010. Construction activities continue as each subsequent cascade is commissioned and placed into service. UUSA performed an Integrated Safety Analysis (ISA) to allow the facility to operate while constructing the remainder of the facility. The ISA Team selected the What-If/Checklist method based on guidance in NUREG-1513 (Ref 2) and AIChE Guidelines (Ref 3). Of the three methods recommended for high risk events HAZOP, What-If/Checklist, or Failure Modes and Effects Analysis (FMEA), the What-If/Checklist lends itself best to construction activities. It combines the structure of a checklist with an unstructured 'brainstorming' approach to create a list of specific accident events that could produce an undesirable consequence. The What-If/Checklist for Operate While Constructing divides the UUSA site into seven areas and creates what-if questions for sixteen different construction activities, such as site preparation, external construction cranes, and internal construction lifts. The result is a total of 112 nodes, for which the Operate While Constructing ISA Team created hundreds of what-if questions. For each what-if question the team determined the likelihood, consequences, safeguards, and acceptability of risk. What-if questions with unacceptable risk are the accident sequences and their selected safeguards are the Items Relied on For Safety (IROFS). The final ISA identified four (4) new accident sequences that, unless

  8. LHC Commissioning and First Operation

    OpenAIRE

    Myers, S

    2010-01-01

    A description is given of the repair of the LHC after the accident of September 2008. The LHC hardware and beam commissioning and initial operation are reviewed both in terms of beam and hardware performance. The implemented machine protection measures and their impact on LHC operation are presented.

  9. Gentilly 2: design, construction and commissioning

    International Nuclear Information System (INIS)

    Amyot, Paul; Michel, Benoit.

    1982-06-01

    Construction of the Gentilly 2 power station is essentially complete, and commissioning is proceeding. The main activities during the 1981-82 period have been the completion of the construction and overall testing of the major systems. One cause of delay in the project in 1981 was the discovery of damage to the tubesheet of a steam generator. An internal manhole cover support in the steam generator head had become loose and had caused damage to the tube-to-tubesheet welds. Repairs to the welds were completed in Feb. 1982 after an extensive development program to qualify the welding procedure. Overall project life will be slightly more than 9 years

  10. The LHC from commissioning to operation

    CERN Document Server

    Lamont, M

    2011-01-01

    In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulating 1 fb-1 by the end of the year. The progress from commissioning to operation is described. Emphasis is put on the beam performance, but also on the performance of the different hardware systems. The role of collimation and machine protection is discussed, in view of the very high stored beam and magnet energy.

  11. Methods for reduction of the period for construction and commissioning of NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2004-01-01

    The process of construction of NPP unit is associated with significant amount of engineering, civil construction works, equipment installation and testing works. In order to achieve better economical results from the point of view of the investor, it will be a benefit if the time period for construction and commissioning of the unit is reduced. In order to realize such reduction of the needed time it is possible to utilize some new approaches for installation of heavy equipment, utilization of prefabricated in advance composite modules of equipment and application of new types of construction equipment and techniques. In such way the commissioning period can be reduced, and high quality of the installation works can be achieved. (author)

  12. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Period of construction; certification of commencement of operation. 25.133 Section 25.133 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period...

  13. Safety in nuclear power plant operation, including commissioning and decommissioning. A code of practice

    International Nuclear Information System (INIS)

    1978-01-01

    Safe operation of a nuclear power plant postulates satisfactory siting, design, construction and commissioning, together with proper management and operation of the plant. This Code of Practice deals with the safety aspects of management, commissioning, operation and decommissioning of the plant. It forms part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to land-based stationary thermal neutron power plants. It has been prepared for the use of those responsible for the operation of stationary nuclear power plants, the main function of which is the generation of electrical and/or thermal power, and for the use of those responsible for regulating the operation of such plants. It is not intended for application to reactors used solely for experimental or research purposes. The provisions in the Code are designed to provide assurance that operational activities are carried out without undue radiological hazard to the general public and to persons on the site. It should be understood that the provisions in the Code set forth minimum requirements which shall be met in order to achieve safe operation of a nuclear power plant

  14. Chemistry control at Bruce NGS 'B' from constructed to commercial operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    1987-01-01

    Pre-operational storage chemistry and flushing of the secondary side is described. The approach devised for Bruce NGS 'B' Unit 6 was unique for an Ontario Hydro Nuclear Unit. The significance of the improved Construction installation and Quality Assurance procedures, combined with those of Operations is identified. Secondary side chemistry during both commissioning and later operation is reported. It will be shown that the application of ALARA (As Low As is Reasonably Achievable) concept has resulted in tighter chemical specifications being met

  15. Basic national requirements for safe design, construction and operation

    International Nuclear Information System (INIS)

    Franzen, L.F.

    1980-01-01

    Nuclear power plants have to be save. Vendors and utilities operating such plants, are convinced that their plants meet this requirement. Who, however, is establishing the safety requirements to be met by those manufacturing and operating nuclear power plants. What are the mechanisms to control whether the features provided assure the required safety level. Who controls whether the required and planned safety features are really provided. Who is eventually responsible for assuring safety after commissioning of a nuclear power plant. These fundamental questions being raised in many discussions on safety and environmental protection are dealt with in the following sections: (1) Fundamental safety requirements on nuclear power plants, in which such items as risk, legal bases and licensing procedure are discussed, (2) Surveillance during construction, in which safety analysis report, siting, safety evaluation, document examination, quality assurance, and commissioning testing are dealt with, (3) Operating tests and conditions in which recurrent inspections, environmental protection during operation, investigation of abnormal occurences and backfitting requirements as reviewed, and (4) Safety philosophy and safety policy to conclude this presentation. The German approach to nuclear safety serves as an example for an effective way of assuring safe nuclear power. (orig.)

  16. Extensive Analysis of Worldwide Events Related to The Construction and Commissioning of Nuclear Power Plants: Lessons Learned and Recommendations

    International Nuclear Information System (INIS)

    Noel, M.; Zerger, B.; Vuorio, U.; )

    2011-01-01

    Lessons learnt from past experience are extensively used to improve the safety of nuclear power plants (NPPs) worldwide. Although the process of analyzing operational experience is now widespread and well developed, the need for establishment of a similar process for construction experience was highlighted by several countries embarking on construction of new NPPs and in some international forums including the Working Group on the Regulation of New Reactors (WGRNR) of the OECD-NEA. In 2008, EU Member State Safety Authorities participating to the EU Clearinghouse on Operational Experience Feedback decided to launch a topical study on events related to pre-operational stages of NPPs. The aim of this topical study is to reduce the recurrence of events related to the construction, the initial component manufacturing and the commissioning of NPPs, by identifying the main recurring and safety significant issues. For this study, 1090 IRS event reports, 857 US Licensee Event Reports (LERs) and approximately 100 WGRNR reports have been preselected based on key word searches and screened. The screening period starts from the beginning of the databases operation (in the 1980's as far as IRS and LER database are concerned) and ends in November 2009. After this initial screening, a total of 582 reports have been found applicable (247 IRS reports, 309 LERs and 26 WGRNR reports). Events considered for this study were those which have been initiated before the start of commercial operation, and detected before or even long after commercial operation. The events have been classified into 3 main categories (construction, manufacturing and commissioning), and into further sub-categories (building structures, metallic liners, electrical components, anchors, I and C, penetrations and building seals, emergency diesel generators, pipes, valves, welds, pumps, etc.) in order to facilitate the detailed analysis with the final objective to formulate both equipment specific

  17. Experience from the construction and operation of Tarapur and Rajasthan Nuclear Power Stations

    International Nuclear Information System (INIS)

    Shah, J.C.; Pardiwala, T.F.; Kothare, V.V.; Rao, M.H.P.; Nanjundeswaran, K.

    1977-01-01

    India's experience in construction and operation of nuclear power stations so far covers two BWR and four PHWR Units in three power stations. Two more PHWR units are at an early stage of construction. The twin unit Tarapur Station (2x210 MWe BWR) was built as a turnkey project which restricted participation of Indian engineers in design and construction considerably. The contrasting approach adopted for Rajasthan Station (2x220 MWe PHWR) involved Indian personnel and contractors fully in construction and commissioning, with Canadians providing supervisory assistance in Rajasthan I and essentially consultative help for Rajasthan II. Subsequent stations are wholly Indian efforts. Tarapur went into commercial operation in 1969, 60 months after breaking of ground. Construction was essentially uneventful, major problems faced being stress corrosion induced cracks in the reactor lining and complete change of steam generator tubes. In its seven years of operations, Tarapur has faced several problems mainly arising from rather early designs, indifferent fuel performance, constraints of twin-unit approach and operations in an inadequately developed grid system apart from those generally stemming from assimilation of an advanced technology in a developing country. The Station has undergone six refuellings during this period. Most of the problems have been overcome by design changes, system augmentations and experience and the Station operation since mid 1974 have generally been steady at around 90% of the rated capacity. Construction of Rajasthan I at a remote and isolated site proceeded relatively slowly. Local availability of skilled and semi-skilled manpower was poor, affecting construction. Inadequate roads impeded movements of overdimensioned components. Observing strict Quality Assurance standards required several major rectifications at site. Rajasthan I went on line in 1973 after overcoming major turbine bearing problems during commissioning. Since then, while

  18. Summarisation of construction and commissioning experience for nuclear power integrated test facility

    International Nuclear Information System (INIS)

    Xiao Zejun; Jia Dounan; Jiang Xulun; Chen Bingde

    2003-01-01

    Since the foundation of Nuclear Power Institute of China, it has successively designed various engineering experimental facilities, and constructed nuclear power experimental research base, and accumulated rich construction experiences of nuclear power integrated test facility. The author presents experience on design, construction and commissioning of nuclear power integrated test facility

  19. Safety of Nuclear Power Plants: Commissioning and Operation

    International Nuclear Information System (INIS)

    2011-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  20. A Study on the Efficient Operating Management of Atomic Energy Commission

    International Nuclear Information System (INIS)

    Yun, Sungwon; Chung, W. S.; Lee, D. S.; Park, S. J.

    2013-04-01

    This study aimed to provide professionals in humanities and social sciences, not only nuclear, with a place for communication by establishing a website of Atomic Energy Commission and people with a place for participation which help the nuclear policy reflect public opinions. By establishing the website of Atomic Energy Commission, experts (including those in humanities and social sciences) can suggest policy agenda and public opinions can be suggested through the place for public participation. Also the website should restrict on indiscreet search by separating sections only for experts and provide experts with a section for active and creative debate on nuclear policy. All the accessible meeting agenda and minutes have been chronologically organized and the findings of the committee have been announced to share with people concerning nuclear policy. In terms of the effective operation of Atomic Energy Commission, research has been conducted for standing committee, regular meeting, activating the commission through system change and expert committee in addition to support for the 2nd meeting of Atomic Energy Committee and the 31st Nuclear Expert Committee. Activation measures to improve the operating system of the commission is proposed as following; changing of the commission's chairman operating system, standing commission regular meeting, activation of subcommittee and expanding and diversifying of agenda

  1. How to Commission, Operate and Maintain a Large Future Accelerator Complex From Far Remote Sites

    International Nuclear Information System (INIS)

    Phinney, Nan

    2001-01-01

    A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commissioning, machine development, maintenance, trouble shooting and repair. Experience from existing accelerators confirms that most of these activities are already performed remotely. The large high-energy physics experiments and astronomy projects, already involve international collaborations of distant institutions. Based on this experience, the prospects for a machine operated remotely from far sites are encouraging. Experts from each laboratory would remain at their home institution but continue to participate in the operation of the machine after construction. Experts are required to be on site only during initial commissioning and for particularly difficult problems. Repairs require an on-site non-expert maintenance crew. Most of the interventions can be made without an expert and many of the rest resolved with remote assistance. There appears to be no technical obstacle to controlling an accelerator from a distance. The major challenge is to solve the complex management and communication problems

  2. How to Commission, Operate and Maintain a Large Future Accelerator Complex From Far Remote Sites

    Energy Technology Data Exchange (ETDEWEB)

    Phinney, Nan

    2001-12-07

    A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commissioning, machine development, maintenance, troubleshooting and repair. Experience from existing accelerators confirms that most of these activities are already performed 'remotely'. The large high-energy physics experiments and astronomy projects, already involve international collaborations of distant institutions. Based on this experience, the prospects for a machine operated remotely from far sites are encouraging. Experts from each laboratory would remain at their home institution but continue to participate in the operation of the machine after construction. Experts are required to be on site only during initial commissioning and for particularly difficult problems. Repairs require an on-site non-expert maintenance crew. Most of the interventions can be made without an expert and many of the rest resolved with remote assistance. There appears to be no technical obstacle to controlling an accelerator from a distance. The major challenge is to solve the complex management and communication problems.

  3. Laparotomy operative note template constructed through a modified Delphi method.

    Science.gov (United States)

    Moore, Lolonya; Churley-Strom, Ruth; Singal, Bonita; O'Leary, Sharon

    2009-05-01

    An operative note is indispensable to physician documentation and decision-making; however, there are no accepted standards for operative note content. Our aim was to use a modified Delphi consensus-building method to construct a uniform operative note template for laparotomy. Using Joint Commission on Accreditation of Healthcare Organizations requirements, literature review, and feedback from 15 medical malpractice defense attorneys, we compiled a draft operative note template of 31 elements. We surveyed 37 Association of Professor of Gynecology and Obstetrics/Solvay scholars asking for their input on inclusion of each item as essential content of the operative note. Two iterations of the survey were required to reach a predetermined 75% level of consensus. Nine elements were eliminated from the template: 6 original and 3 expert-suggested elements. We provide an operative note template that was compiled through a Delphi process.

  4. The NEW detector: construction, commissioning and first results

    Science.gov (United States)

    Nebot-Guinot, M.; NEXT Collaboration

    2017-09-01

    NEXT (Neutrino Experiment with a Xenon TPC) is a neutrinoless double-beta (ββ0ν) decay experiment at the Canfranc Underground Laboratory (LSC). It seeks to detect the ββ0ν decay of Xe-136 using a high pressure xenon gas TPC with electroluminescent (EL) amplification. The NEXT-White (NEW) detector, with an active xenon mass of about 10 kg at 15 bar, is the first NEXT prototype installed at LSC. It implements the NEXT detector concept tested in smaller prototypes using the same radiopure sensors and materials that will be used in the future NEXT-100, serving as a benchmark for technical solutions as well as for the signal selection and background rejection algorithms. NEW is currently under commissioning at the LSC. In this poster proceedings we describe the technical solutions adopted for NEW construction, the lessons learned from the commissioning phase, and the first results on energy calibration and energy resolution obtained with low-energy radioactive source data.

  5. Point Lepreau G.S. commissioning management experience

    International Nuclear Information System (INIS)

    Alikhan, S.; Walker, W.J.

    1983-05-01

    This paper shares the experience gained by New Brunswick Power in commissioning its first nuclear plant, with particular emphasis on the management techniques that were developed. Some of the areas discussed include: organization of Nuclear Operations Group responsible for commissioning and its interface with construction; outline and scope of documentation required to define, execute and report commissioning to satisfy the licensing requirements, management techniques developed to implement commissioning; and a summary of lessons learned and recommendations for the future

  6. Regulating Nuclear Reactor Construction and Commissioning, and Preparation for Operation – Challenges for a New Regulatory Body

    International Nuclear Information System (INIS)

    Viktorsson, C.

    2016-01-01

    Following an introduction with a description of the peaceful nuclear energy program in the United Arab Emirates (UAE) and an overview of the regulatory framework for safety, security and safeguards, this paper describes the regulatory approach for oversight of construction and the granting of an Operating Licence for the first nuclear power plant in the UAE. The paper describes the inspection programme set up by the Federal Authority for Nuclear Regulation (FANR) to verify construction and preoperational testing by the licensee. Moreover, it outlines the content of the operating licence application and focus areas for the regulatory review and assessment. Also, the paper describes the basic elements required by FANR for the decision-making regarding the issuance of the Operating Licence including integration of the results of review and assessment and the implementation of a systematic inspection programme to ensure operational readiness to operate and maintain the plant in accordance with FANR regulations. Finally, the paper addresses the preparation for regulatory oversight and the skill-set needed at FANR to ensure an effective and efficient oversight of safety, security of the nuclear energy power in the UAE. (author)

  7. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  8. Experience relevant to safety obtained from reactor decommissioning operations in the French Atomic Energy Commission

    International Nuclear Information System (INIS)

    Giraudel, B.; Langlois, G.

    1979-01-01

    From among the nuclear facilities constructed in France the authors cite eight large reactors, ranging from critical assemblies to power reactors, that have been finally shut-down since 1965. A brief account is given of the way in which the various operations were carried out after the final control rod drop, a distinction being drawn between the shut-down proper and the containment and dismantling work. A description is also given, from the technical and regulatory standpoint, of the final stage attained, and mention is made of French safety arrangements and of the part played by the safety services during decommissioning operations. Among the lessons derived from French experience, the authors mention the completion of operations without any serious safety problems, and with guarantees for the protection of personnel and the population as a whole, by conventional techniques; the advantage of planning decommissioning operations from the very beginning of construction of the facilities; and the importance of filing descriptive documents. In view of the experience gained, the French Atomic Energy Commission has devised internal procedures for facilitating the application of regulations governing the shut-down and decommissioning phases, which are aimed at preserving surveillance procedures similar to those in force during normal operation. (author)

  9. The ATLAS Insertable B-Layer: from construction to operation

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00218666; The ATLAS collaboration

    2016-01-01

    The ATLAS Insertable B-Layer (IBL) is the innermost layer of pixel detectors, and was installed in May 2014 at a radius of 3.3 cm from the beam axis, between the existing Pixel detector and a new smaller radius beam-pipe. The new detector, built to cope with high radiation and occupancy, is the first large scale application of 3D sensors and CMOS 130 nm technology. The IBL detector construction was completed within about two years (2012-2014), and the key features and challenges met during the IBL project are presented, as well as its commissioning and operational experience at the LHC

  10. Commissioning and operation of distillation column at Madras Atomic Power Station (Paper No. 1.10)

    International Nuclear Information System (INIS)

    Neelakrishnan, G.; Subramanian, N.

    1992-01-01

    In Madras Atomic Power Station (MAPS), an upgrading plant based on vacuum distillation was constructed to upgrade the downgraded heavy water collected in vapor recovery dryers. There are two distillation columns and each having a capacity of 77.5 tonne per annum of reactor grade heavy water with average feed concentration of 30% IP. The performance of the distillation columns has been very good. The column I and column II have achieved an operating factor of 92% and 90% respectively. The commissioning activities, and subsequent improvements carried out in the distillation columns are described. (author)

  11. Safety of Nuclear Power Plants: Commissioning and Operation (Spanish Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  12. Safety of Nuclear Power Plants: Commissioning and Operation (French Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  13. Safety of Nuclear Power Plants: Commissioning and Operation. Arabic Edition

    International Nuclear Information System (INIS)

    2011-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  14. Commissioning performance activities of Heavy Water Plant (Hazira) (Paper No. 1.4)

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Heavy Water Plant, Hazira is the fourth in the line of plants based on monothermal NH 3 -H 2 exchange process. The experience gained during operation of other heavy water plants is reflected in the construction, commissioning and operation of HWP, Hazira. This paper aims at outlining the strategy adopted for both commissioning and operation. (author)

  15. Ten years of cryo-magnetic W7-X test facility construction and operation

    International Nuclear Information System (INIS)

    Renard, B.; Dispau, G.; Donati, A.; Genini, L.; Gournay, J.F.; Kuster, O.; Molinie, F.; Schild, T.; Touzery, R.; Vieillard, L.; Walter, C.

    2011-01-01

    The construction, commissioning, and operation phases of the W7-X cryo-magnetic test facility in CEA Saclay lasted ten years. The large diversity of equipments called, specialties involved and problems solved attest the expertise that was required to operate the test facility and test the coils. Nearly one hundred cryogenic tests were performed on the seventy W7-X coils, at a rate always increasing, using two cryostats each holding two coils. This paper presents the test facility and its operation first, the cryogenic difficulties that were confronted with their solutions, the electro-magnetic difficulties encountered along with corrective actions, and finally the instrumentation and data acquisition aspects. (authors)

  16. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  17. Commissioning of the SPARC Movable Emittance Meter and Its First Operation at PITZ

    CERN Document Server

    Catani, L; Cianchi, A

    2005-01-01

    For the SPARC Project a novel diagnostic device, called "Emittance-meter", has been conceived and constructed to perform a detailed study of the emittance compensation process in the SPARC photo-injector and to optimize the RF-gun and the accelerator working point. It consists of a movable emittance measurement system, based on the 1D pepper-pot method, installed between two long bellows with the possibility to scan a region 1.5 m long downstream the RF-gun. The construction of the device was completed in the first part of this year and a series of laboratory tests, to evaluate its performances, were carried out in Spring 2005. At the beginning of the summer the complete system was moved to DESY at Zeuthen to be installed on the Photo Injector Test Facility PITZ. After the commissioning it will used for measurements of the PITZ electron beam in the framework of a collaboration between the SPARC and PITZ Projects aiming on studies and operations with photo injectors.

  18. BROOKHAVEN: Booster commissioned

    Energy Technology Data Exchange (ETDEWEB)

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  19. National symposium on commissioning and operating experiences in heavy water plants and associated chemical industries [Preprint volume

    International Nuclear Information System (INIS)

    1992-02-01

    A symposium on commissioning and operating experiences in heavy water plants and associated chemical industries (SCOPEX-92) was organised to share the experience and exchange the ideas among plant operators, designers, consultants and vendors in the areas of operation, commissioning and equipment performance. This pre-print volume has been brought out as an integrated source of information on commissioning and operation of heavy water plants. The following aspects of heavy water plants are covered: commissioning and operation, instrumentation and control, and safety and environment. (V.R.)

  20. Commissioning and operation of the horizontal test apparatus at SNS

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sang-Ho [ORNL; Neustadt, Thomas S. [ORNL; Howell, Matthew P. [ORNL; Hannah, Brian S. [ORNL; Doleans, Marc [ORNL; Saunders, Jeffrey W. [ORNL

    2015-07-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Lab (ORNL) has built, commissioned and operated a Horizontal Test Apparatus (HTA) vessel in the Radiofrequency Test Facility (RFTF) test cave. It can be operated at 4.5 K using the independent Cryogenic Test Facility (CTF). The HTA is designed to be a single cavity version of an SNS cryomodule with the ability to demount and replace the cavity. It provides the functionality for testing a single dressed SNS medium or high beta Superconducting Radiofrequency (SRF) cavity. The HTA is currently being used in support of R&D for in-situ plasma processing of the cavity's inner niobium surface. The design and commissioning of the HTA at 4.5 K will be presented as well as results from operating the HTA including cool-down, warm-up and steady state operations. Results from plasma processing a warm SCRF cavity in-between cold HTA tests will also be reported.

  1. Experience gained during commissioning and trial operation of Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    GaL, P.; Adamica, T.; Marosik, V.; Rehak, A.

    2000-01-01

    In this paper authors describe the experience gained during commissioning and trial operation of Mochovce NPP (EMO). The first year of EMO operation from the point of view of safety and reliability was successful. Evidently we were challenged with certain problems characteristic to this stage of operation which resulted in automatic reactor shutdown. There were 11 automatic shutdowns in 1998 by action of the quick emergency protection AO-1 and two manual shutdowns by the AO-1 key. In 1999, there were 6 automatic shutdowns by action of the quick emergency protection AO-1. Three of them was connected to the falsely activated binary signal of MCP switch of, in two cases the reason came out from the turbo-generator (TG) cooling water system. Very positive trend in the operation of both units shows the fact that during all commissioning period of the second unit there were only three automatic reactor shutdowns by the signal AO-1. All these actions were done in frame of commissioning tests. All causes which activated the automatic unit shutdowns were found out and rectified, the overall tuning of the cooling water system is on the process now. The solution of this problem is possible only power commissioning, and in the stage of the trial operation had no direct impacts on the nuclear, radiation, or technical safety respectively. In 1998 two events according to the INES scale after second unit commissioning because of two unit links of the cooling water system. The operational events during the commissioning tests, start-up tests, physical commissioning, were ranked the category 1 ('Action of SIS U040 p po <8,34 MPa at the system 2 and 3' and 'Breaching the L and C'). In 1999 only events occurred that were ranked in the category safety insignificant events and lower (category 0, or off the scale respectively). In the frame of the safety culture principles adopted, such as critical attitude, exact and careful approach, and communication, these problems were given the

  2. Commissioning and operation of DRAGON

    International Nuclear Information System (INIS)

    Engel, Sabine

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the 21 Na(p,γ) 22 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of ±20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented

  3. Computational tools for cyclotron design, commissioning, and operation

    International Nuclear Information System (INIS)

    Kost, C.J.

    1989-05-01

    Many support systems are required in the design, commissioning, and normal operation of a modern cyclotron. Presented is an overview of the computing environment developed during these various stages at TRIUMF. The current computing environment is also discussed, with emphasis on how one can provide an integrated system which is user-friendly

  4. Behind the Scenes of Public Construction Clients – Collecting Data on Commissioning Activities and Organisational Approach

    NARCIS (Netherlands)

    Hermans, M.H.; Eisma, P.R.

    2015-01-01

    The understanding of public commissioning activity is fairly limited, with national and European research primarily focusing on large scale projects, European procurement procedures and new construction. However, most construction activities involve small scale projects and assignments performed by

  5. Startup and commissioning of pressurized water reactors

    International Nuclear Information System (INIS)

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  6. 25 CFR 502.22 - Construction and maintenance of the gaming facility, and the operation of that gaming is...

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction and maintenance of the gaming facility, and the operation of that gaming is conducted in a manner which adequately protects the environment and the public health and safety. 502.22 Section 502.22 Indians NATIONAL INDIAN GAMING COMMISSION...

  7. Commissioning for the European XFEL facility

    Science.gov (United States)

    Nölle, D.

    2017-06-01

    The European XFEL is a 4th generation light source based on the Self Amplified Spontaneous Emission (SASE) FreeElectron-Laser concept. It is currently being commissioned in North- Germany. The core installation is a 17.5 GeV superconducting accelerator driving 3 SASE lines with photon energies from 1 to beyond 20 keV range with a maximum of 27.000 pulses per second. The international facility is organized as a limited liability company with shareholders from the contributing countries. DESY has taken over the leadership of the accelerator construction consortium, and will be in charge of the operation of the accelerator complex. The facility was set up with contributions from the 11 shareholder countries, either being hardware systems and/or staff or cash contributions. The construction is almost complete, and the commissioning phase has started by the end of 2015. This contribution will report the status of the accelerator complex with emphasis on the commissioning of the accelerator and an outlook to the commissioning of the SASE 1 FEL line.

  8. CMS operations for Run II preparation and commissioning of the offline infrastructure

    CERN Document Server

    Cerminara, Gianluca

    2016-01-01

    The restart of the LHC coincided with an intense activity for the CMS experiment. Both at the beginning of Run II in 2015 and the restart of operations in 2016, the collaboration was engaged in an extensive re-commissioning of the CMS data-taking operations. After the long stop, the detector was fully aligned and calibrated. Data streams were redesigned, to fit the priorities dictated by the physics program for 2015 and 2016. A new reconstruction software (both online and offline) was commissioned with early collisions and further developed during the year. A massive campaign of Monte Carlo production was launched, to assist physics analyses. This presentation reviews the main event of this commissioning journey and describes the status of CMS physics performances for 2016.

  9. Commissioning and operation of DRAGON

    CERN Document Server

    Engel, S

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the sup 2 sup 1 Na(p,gamma) sup 2 sup 2 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of +-20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented.

  10. Construction of vertex operators using operator formalism techniques

    International Nuclear Information System (INIS)

    Gato, B.; Massachusetts Inst. of Tech., Cambridge

    1989-01-01

    We derive vertex operators in oscillator form as an application of the conserved charges method developed by Vafa for the operator formalism in higher genus Riemann surfaces. This construction proves to be clear, direct and valid for the bosonic and fermionic strings as wells as for twisted strings on orbifolds. We discuss the method and construct vertex operators for the bosonic string moving on Z N orbifolds and for the fermionic string in the NSR formulation. (orig.)

  11. Reactor Safety Commission Code of Practice for Pressurized Water Reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The Reactor Safety Commission of the Federal German Republic has summarized in the form of Official Guidelines the safety requirements which, in the Commission's view, have to be met in the design, construction and operation of a nuclear power station equipped with a pressurized water reactor. The Third Edition of the RSK Guidelines for pressurized water reactors dated 14.10.81. is a revised and expanded version of the Second Edition dated 24.1.79. The Reactor Safety Commission will with effect from October 1981 use these Guidelines in consultations on the siting of and safety concept for the installation approval of future pressurized water reactors and will assess these nuclear power stations during their erection in the light of these Guidelines. They have not however been immediately conceived for the adaptation of existing nuclear power stations, whether under construction or in operation. The scope of application of these Guidelines to such nuclear power stations will have to be examined for each individual case. The main aim of the Guidelines is to simplify the consultation process within the reactor Safety Commission and to provide early advice on the safety requirements considered necessary by the Commission. (author)

  12. Construction Minerals Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes construction minerals operations in the United States. The data represent commodities covered by the Minerals Information Team (MIT) of the...

  13. Commissioning of the ATLAS Insertable B-Layer and first operation experience

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00439451; Dobos, Daniel; Rembser, Christoph

    Todays research in particle physics offers a wide field of opportunities for scientists from a variety of different subjects. Discoveries can only be made, with hundreds up to thousands of people working together in collaborations. Designing high precision detectors that can be up to several stories tall, followed by production, construction, commissioning and successful operation is only achievable with the combined effort of skilled and experienced detector physicists and engineers, while the vast amount of data recorded with those detectors calls for specialists in data analysis which are able to find the needle in a haystack or in other words the higgs in a sea of underground events. One of the biggest science collaborations worldwide is the ATLAS collaboration with more than 5000 members from around 180 institutes. ATLAS is one of four big particle physics experiments at the LHC. Its tracking system has been upgraded with a new innermost layer, referred to as Insertable B-Layer (IBL), in 2014. This thesi...

  14. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  15. Safety Evaluation Report related to the construction permit and operating license for the research reactor at the University of Texas (Docket No. 50-602)

    International Nuclear Information System (INIS)

    1985-05-01

    This Safety Evaluation Report for the application filed by the University of Texas for a construction permit and operating license to construct and operate a TRIGA research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the University of Texas and is located at the university's Balcones Research Center, about 7 miles (11.6 km) north of the main campus in Austin, Texas. The staff concludes that the TRIGA reactor facility can be constructed and operated by the University of Texas without endangering the health and safety of the public

  16. Behind the Scenes of Public Construction Clients – Collecting Data on Commissioning Activities and Organisational Approach

    OpenAIRE

    Hermans, Marleen; Eisma, Pieter

    2015-01-01

    The understanding of public commissioning activity is fairly limited, with national and European research primarily focusing on large scale projects, European procurement procedures and new construction. However, most construction activities involve small scale projects and assignments performed by smaller scale semi-public organisations such as hospitals, schools or housing associations. Similarities and differences between new construction and asset management have not received ample attent...

  17. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  18. 25 CFR 700.467 - Construction costs.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...

  19. The ATLAS Insertable B-Layer: from construction to operation

    CERN Document Server

    La Rosa, Alessandro; The ATLAS collaboration

    2016-01-01

    The ATLAS Insertable B-Layer (IBL) is a fourth layer of pixel detectors, and has been installed in May 2014 at a radius of 3.3 cm between the existing Pixel Detector and a new smaller radius beam-pipe. The new detector, built to cope with high radiation and occupancy, is the first large scale application of 3D detectors and CMOS 130nm technology. The IBL detector construction was achieved within about two years starting from mid-2012 to the May 2014 installation in ATLAS, a very tight schedule to meet the ATLAS installation and detector closure before starting the Run2 in Spring 2015. The key features and challenges met during the IBL project will be presented, as well as its commissioning and operational experience in LHC.

  20. The ATLAS Liquid Argon Electromagnetic Calorimeter Construction, commissioning and elected test beam results

    CERN Document Server

    Hervás, L

    2004-01-01

    The construction of the ATLAS Liquid Argon Electromagnetic Calorimeter has been completed and commissioning is in progress to prepare the cryostats for lowering into the ATLAS pit. After a brief description of the detector, its construction and readout electronics, this paper summarizes results of quality checks (electrical, connectivity) carried out during the integration of the calorimeter wheels into the cryostats. We present also selected results of its performance, such as linearity, energy resolution, timing resolution, uniformity of the energy response, obtained in beam tests with several series modules. 16 Refs.

  1. Quality system applied to the development and operation of the environmental and internal dosimetry laboratory of the National Atomic Energy Commission

    International Nuclear Information System (INIS)

    Tossi, Mirta H.; Picardi, Haydee M.; Rona, Nicolas F.; Gonzalez, Maria I.; Cohen, Isaac M.

    1997-01-01

    The characteristics of the quality plan , applied to the project of construction, commissioning and operation of the Laboratory of Internal and Environmental Dosimetry of Comision Nacional de Energia Atomica, are described. The basic objectives are: to carry out the determination of plutonium, natural and enriched uranium in biological samples, involving the operation of five plants connected with the fuel cycles, and radionuclides in environmental samples; to achieve enough sensitivity in the methods, so as to detect trends which could require the application of corrective measures or, alternatively, the practices standardisation that contribute to an operation improvement; to adequate the laboratory, under full operation conditions, for inclusion in a dose evaluation and environmental monitoring integrated system. (author). 1 ref

  2. Construction and commissioning of a hydrogen cryogenic distillation system for tritium recovery at ICIT Rm. Valcea

    Energy Technology Data Exchange (ETDEWEB)

    Ana, George, E-mail: george.ana@icsi.ro [Institute for Cryogenic and Isotopic Technologies, Rm. Valcea (Romania); Cristescu, Ion [Karlsruhe Istitute for Technologies, Tritium Laboratory, Eggenstein-Leopoldshaffen (Germany); Draghia, Mirela [ISTECH, Timisoara (Romania); Bucur, Ciprian; Balteanu, Ovidiu; Vijulie, Mihai; Popescu, Gheorghe; Costeanu, Claudiu; Sofilca, Nicolae; Stefan, Iulia; Daramus, Robert; Niculescu, Alina; Oubraham, Anisoara; Spiridon, Ionut; Vasut, Felicia; Moraru, Carmen; Brad, Sebastian [Institute for Cryogenic and Isotopic Technologies, Rm. Valcea (Romania); Pasca, Gheorghe [ISTECH, Timisoara (Romania)

    2016-05-15

    Highlights: • Cryogenic distillation (CD) process is being employed for tritium separation from tritiated hydrogen mixtures. • Process control and safety phylosophy with the detritiation plant from Rm. Vâlcea. • Tests undertaken prior to commissioning of the CD system from Rm. Vâlcea. • Preliminary experiments with the CD system (non-radiological). - Abstract: Cryogenic distillation (CD) of hydrogen in combination with Liquid Phase Catalytic Exchange (LPCE) or Combined Electrolytic Catalytic Exchange (CECE) process is used for tritium removal/recovery from tritiated water. Tritiated water is being obtained after long time operation of CANDU reactors, or in case of ITER mainly by the Detritiation System (DS). The cryogenic distillation system (CDS) used to remove/recover tritium from a hydrogen stream consists of a cascade of cryogenic distillation columns and a refrigeration unit which provides the cooling capacity for the condensers of CD columns. The columns, together with the condensers and the process heat-exchangers are accommodated in a vacuumed cold box. In the particularly case of the ICIT Plant, the cryogenic distillation cascade consists of four columns with diameters between 100–7 mm and it has been designed to process up to 10 mc/h of tritiated deuterium. This paper will present the steps undertaken for construction and commissioning of a pilot plant for tritium removal/recovery by cryogenic distillation of hydrogen. The paper will show besides preliminary data obtained during commissioning, also general characteristics of the plant and its equipments.

  3. ARIEL E-linac Cryogenic System: Commissioning and First Operational Experience

    International Nuclear Information System (INIS)

    Koveshnikov, A; Bylinskii, I; Hodgson, G; Kishi, D; Laxdal, R; Ma, Y; Nagimov, R; Yosifov, D

    2015-01-01

    The Advanced Rare IsotopE Laboratory (ARIEL) is a major expansion of the Isotope Separator and Accelerator (ISAC) facility at TRIUMF. A key part of the ARIEL project is a 10 mA 50 MeV continuous-wave superconducting radiofrequency (SRF) electron linear accelerator (e-linac). The 1.3 GHz SRF cavities are operated at 2 K. HELIAL LL helium liquefier by Air Liquide Advanced Technologies (ALAT) with a tuneable liquid helium (LHe) production was installed and commissioned in Q4’2013 [1]. It provides 4 K liquid helium to one injector and one accelerator cryomodules that were installed and tested in 2014. The 4 K to 2 K liquid helium transition is achieved on-board of each cryomodule. The cryoplant, LHe and LN2 distributions, sub-atmospheric (S/A) system and cryomodules were successfully commissioned and integrated into the e-linac cryogenic system. Required pressure regulation for both 4 K cryoplant in the Dewar and 2 K with the S/A system was achieved under simulated load. Final integration tests confirmed overall stable performance of the cryogenic system with two cryomodules installed. The paper presents details of the cryogenic system commissioning tests as well as highlights of the initial operational experience. (paper)

  4. The ATLAS Liquid Argon Calorimeter: Construction, Integration, Commissioning

    International Nuclear Information System (INIS)

    Aleksa, Martin

    2006-01-01

    The ATLAS liquid argon (LAr) calorimeter system consists of an electromagnetic barrel calorimeter and two end caps with electromagnetic, hadronic and forward calorimeters. The liquid argon sampling technique, with an accordion geometry was chosen for the barrel electromagnetic calorimeter (EMB) and adapted to the end cap (EMEC). The hadronic end cap calorimeter (HEC) uses a copper-liquid argon sampling technique with flat plate geometry and is subdivided in depth in two wheels per end-cap. Finally, the forward calorimeter (FCAL) is composed of three modules employing cylindrical electrodes with thin liquid argon gaps.The construction of the full calorimeter system is complete since mid-2004. Production modules constructed in the home institutes were integrated into wheels at CERN in 2003-2004, and inserted into the three cryostats. They passed their first complete cold test before the lowering into the ATLAS cavern. Results of quality checks (e.g. electrical, mechanical, ...) performed on all the 190304 read-out channels after cool down will be reported. End 2004 the ATLAS barrel electromagnetic (EM) calorimeter was installed in the ATLAS cavern and since summer 2005 the front-end electronics are being connected and tested. Results of this first commissioning phase will be shown to demonstrate the high standards of quality control for our detectors

  5. LHC: Construction and Commissioning Status

    CERN Document Server

    Evans, Lyndon R

    2007-01-01

    The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with the exception of a few inner triplet quadrupoles. The first of the eight machine sectors is cold and power tests are proceeding. Two other sectors are ready for cool down and interconnect work is proceeding at a satisfactory pace in the other five sectors. In view of a number of accumulated delays, the original plan for partial commissioning of the machine and a low energy pilot run at the end of 2007 will now have to be abandoned. Instead, the full commissioning of the machine to top energy in a single step will start once the injector chain becomes available in spring 2008.

  6. Operations Management on The Construction Site

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    this as a refreshing renewal and improvement of practical operations management at the site. However this paper will present a first step of development of a new approach to operations management at the building site, which at the same time builds on, and criticize lean construction for missing the point...... of the knowledge economy. This endeavour is carried out in two ways. First by a reading of the operations management literature. Juxtaposing this with lean construction extentions and the critique developed by other scholars. And also drawing on human resource management approaches. Second through a series......” scheme. In both directions it is revealed that the human resource and knowledge element of building processes is largely left untouched by lean construction methods. It is suggested to introduce at least two more dimensions of operations management at the site than the ones offered in lean construction...

  7. Activities of the TUV experts during the period of construction and commissioning of a nuclear power plant ordered by the licensing authorities of the FRG

    International Nuclear Information System (INIS)

    Dommke, J.; Fendler, H.

    1977-01-01

    The inspection organisations in the Federal Republic of Germany (Technische Uberwachungs-Vereine) are independent systems grouped on a regional basis. The competent licensing authorities of the various Lander consult them concerning assessments for site selection and the design, construction, commissioning and operation of nuclear power plants. Furthermore the TUV experts inspect the manufacture of components in the suppliers' facilities and on site. (NEA) [fr

  8. Commissioning of the LHC

    CERN Multimedia

    CERN. Geneva

    2007-01-01

    The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.

  9. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)

    Energy Technology Data Exchange (ETDEWEB)

    Zeitoun, A. [Science Applications International Corp., Germantown, MD (United States)

    1994-08-01

    This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.

  10. Commissioning methods applied to the Hunterston 'B' AGR operator training simulator

    International Nuclear Information System (INIS)

    Hacking, D.

    1985-01-01

    The Hunterston 'B' full scope AGR Simulator, built for the South of Scotland Electricity Board by Marconi Instruments, encompasses all systems under direct and indirect control of the Hunterston central control room operators. The resulting breadth and depth of simulation together with the specification for the real time implementation of a large number of highly interactive detailed plant models leads to the classic problem of identifying acceptance and acceptability criteria. For example, whilst the ultimate criterion for acceptability must clearly be that within the context of the training requirement the simulator should be indistinguishable from the actual plant, far more measurable (i.e. less subjective) statements are required if a formal contractual acceptance condition is to be achieved. Within the framework, individual models and processes can have radically different acceptance requirements which therefore reflect on the commissioning approach applied. This paper discusses the application of a combination of quality assurance methods, design code results, plant data, theoretical analysis and operator 'feel' in the commissioning of the Hunterston 'B' AGR Operator Training Simulator. (author)

  11. Commissioning and early operating experience with the Fermilab horizontal test facility

    Energy Technology Data Exchange (ETDEWEB)

    Carcagno, R.; Chase, B.; Harms, E.; Hocker, A.; Prieto, P.; Reid, J.; Rowe, A.; Theilacker, J.; Votava, M.; /Fermilab

    2007-10-01

    Fermilab has constructed a facility for testing dressed superconducting radiofrequency (RF) cavities at 1.8 K with high-power pulsed RF. This test stand was designed to test both 9-cell 1.3 GHz TESLA-style cavities and 9-cell 3.9 GHz cavities being built by Fermilab for DESY's TTF-FLASH facility. An overview of the test stand and a description of its initial commissioning is described here.

  12. Construction and commissioning of the national synchrotron light source

    International Nuclear Information System (INIS)

    Galayda, J.N.; Blume, M.

    1985-01-01

    The road from conception to completion of a large facility like the National Synchrotron Light Source (NSLS) is a long and tortuous one. More than fifteen years have passed since the first discussions of a synchrotron radiation source at BNL, and there have been many twists and turns in the process. In putting together an accelerator project like this, there are many critical skills that must be assembled, and budgets, schedules and organizations must be properly examined. The lessons learned in design and commissioning of the NSLS rings may be summarized as follows: (1) the damped emittances expected of a Chasman-Green lattice are attainable at high current, if ion trapping problems can be circumvented; (2) there have been no unexpected effects from the rather strong sextupoles required to correct the chromaticities in this type of lattice; (3) the most important beam instabilities are coupled-bunch, and can be counteracted; and (4) commissioning the NSLS rings was mostly an effort to bring the hardware into conformation with the original ring design; achievement of the specified magnetic fields, injection timing, vacuum, RF voltages, etc. led to ring performance which was easily good enough to begin operation

  13. Methods for Automated and Continuous Commissioning of Building Systems

    Energy Technology Data Exchange (ETDEWEB)

    Larry Luskay; Michael Brambley; Srinivas Katipamula

    2003-04-30

    Avoidance of poorly installed HVAC systems is best accomplished at the close of construction by having a building and its systems put ''through their paces'' with a well conducted commissioning process. This research project focused on developing key components to enable the development of tools that will automatically detect and correct equipment operating problems, thus providing continuous and automatic commissioning of the HVAC systems throughout the life of a facility. A study of pervasive operating problems reveled the following would most benefit from an automated and continuous commissioning process: (1) faulty economizer operation; (2) malfunctioning sensors; (3) malfunctioning valves and dampers, and (4) access to project design data. Methodologies for detecting system operation faults in these areas were developed and validated in ''bare-bones'' forms within standard software such as spreadsheets, databases, statistical or mathematical packages. Demonstrations included flow diagrams and simplified mock-up applications. Techniques to manage data were demonstrated by illustrating how test forms could be populated with original design information and the recommended sequence of operation for equipment systems. Proposed tools would use measured data, design data, and equipment operating parameters to diagnosis system problems. Steps for future research are suggested to help more toward practical application of automated commissioning and its high potential to improve equipment availability, increase occupant comfort, and extend the life of system equipment.

  14. Status and commissioning of the CMS experiment

    Science.gov (United States)

    Wulz, C.-E.

    2008-05-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  15. Status and Commissioning of the CMS Experiment

    CERN Document Server

    Wulz, Claudia-Elisabeth

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  16. Status and commissioning of the CMS experiment

    International Nuclear Information System (INIS)

    Wulz, C-E

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented

  17. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe commissioning, operation, and transition from operation to decommissioning of nuclear power plants. Over recent years there have been developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis review and risk informed decision making processes. It became necessary to revise the IAEA’s Safety Requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications, initiated in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan, revealed no significant areas of weakness but resulted in a small set of amendments to strengthen the requirements and facilitate their implementation. These are contained in the present publication.

  18. Construction of Nijenhuis operators and dendriform trialgebras

    Directory of Open Access Journals (Sweden)

    Philippe Leroux

    2004-01-01

    Full Text Available We construct Nijenhuis operators from particular bialgebras called dendriform-Nijenhuis bialgebras. It turns out that such Nijenhuis operators commute with TD-operators, a kind of Baxter-Rota operators, and are therefore closely related to dendriform trialgebras. This allows the construction of associative algebras, called dendriform-Nijenhuis algebras, made out of nine operations and presenting an exotic combinatorial property. We also show that the augmented free dendriform-Nijenhuis algebra and its commutative version have a structure of connected Hopf algebras. Examples are given.

  19. Development of brown coal liquefaction. Design, construction and operation of a 50 t/d pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    1985-08-01

    As for the development of 50t/d pilot plant for the development of liquefaction plant of Victorian brown coal in Australia, outline of the results of the researches in 1984 is reported from the following 4 viewpoints; 1: design of process apparatuses, 2: manufacture of apparatuses, 3: field work of the construction, 4: preparation for operation of the plant. On the first item, the outline of ordering designed equipment from Japanese and Australian companies is described. On the second item the acceptance of purchasing goods from Japan and Australia and promotion of the inspection and quality assurance system. On the third item, contents of the continuous construction of the first stage are described. On the fourth item, the establishment and review of rules and regulations, training and education for operators, enviromental assessment, contents of safety and maintenance work and commissioning work by the promoting department for preparation of operation are described. Moreover support works of wide range for the promotion and adoption by necessary personnel, labour unions, the state of labour and activities for local discricts are described.

  20. Experience of analysis of the operational occurrences in Angra-1 during the commissioning phase

    International Nuclear Information System (INIS)

    Praes, J.G.L.; Borba, P.R.; Collussi, I.

    1984-01-01

    It is presented a methodology and analysis to determine the importance level of the operational occurences. It is included a description and evaluation of a operational occurence in Angra-1 during the commissioning. (M.C.K.) [pt

  1. NSLS-II commissioning and operation

    Energy Technology Data Exchange (ETDEWEB)

    Wang, G., E-mail: gwang@bnl.gov; Shaftan, T.; Bassi, G.; Bengtsson, J.; Blednykh, A.; Blum, E.; Cheng, W.; Choi, J.; Davidsaver, M.; Doom, L.; Fliller, R.; Ganetis, G.; Guo, W.; Hidaka, Y.; Kramer, S.; Li, Y.; Podobedov, B.; Qian, K.; Rose, J.; Seletskiy, S. [Brookhaven National Laboratory, Upton, NY 11973 (United States); and others

    2016-07-27

    The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

  2. Management of fire and industrial safety - challenges during commissioning of a NPP

    International Nuclear Information System (INIS)

    Maiti, Subhaschandra; Mohan, Nalini; Ghadge, S.G.; Bajaj, S.S.

    2006-01-01

    Construction and commissioning period of NPP are reduced world over drastically by stringent schedule for financial and economic reasons. For meeting the schedule, commissioning of components and systems are started immediate after installation, while construction activities are continued in parallel at the same place. Parallel activities' and 'Time Constraint' have brought new challenges to 'Management of Fire and Industrial Safely' during commissioning. An innovative approach was used during such phase of commissioning of TAPP-3 and 4. This paper outlines challenges encountered during this phase and special approach and measures used to meet those challenges. This paper also outlines problems encountered during implementation of these measures and subsequent change in approach to ensure smooth and safe execution of activities. Primarily, challenges were conflicting requirements by various agencies to carryout commissioning in parallel with construction activities concurrently. Main challenges were related to fall hazard, chemical hazard, fire hazard, electrical safety, work in confined space, housekeeping problem. Moreover it was within exclusion zone of another operating plant, which added one more dimension to those challenges. Conventional Safely management approach was little short to resolve these challenges. Such challenges were envisaged; analyzed and innovative measures were arrived at. Along with conventional safely analysis like Job Safely or Hazard Analysis (JSA or JHA), Accident Analysis, Accident Trend Analysis, Fire Hazard Analysis (FHA), innovative method like 'Area-Job- Hazard Charting' and 'Ratio Analysis' were used to understand activity dependent time varying hazard scenarios. Based on this analysis, decision were taken to change various existing elements of safely management like safety organizations; standard operating procedures (SOP); emergency operating procedures (EOP); resource allocation, planning and scheduling; safely training; safely

  3. Construction and operation costs of constructed wetlands treating wastewater.

    Science.gov (United States)

    Gkika, Dimitra; Gikas, Georgios D; Tsihrintzis, Vassilios A

    2014-01-01

    Design data from nine constructed wetlands (CW) facilities of various capacities (population equivalent (PE)) are used to estimate construction and operation costs, and then to derive empirical equations relating the required facility land area and the construction cost to PE. In addition, comparisons between the costs of CW facilities based on various alternative construction materials, i.e., reinforced concrete and earth structures (covered with either high density polyethylene or clay), are presented in relation to the required area. The results show that earth structures are economically advantageous. The derived equations can be used for providing a preliminary cost estimate of CW facilities for domestic wastewater treatment.

  4. Enterprise risk management in international construction operations

    CERN Document Server

    Zhao, Xianbo; Low, Sui Pheng

    2015-01-01

    This book provides readers an understanding of the implementation of Enterprise Risk Management (ERM) for international construction operations. In an extended case study, it primarily focuses on Chinese construction firms (CCFs) based in Singapore. In this regard, the book explains the differences and similarities between Risk Management (RM), Project Risk Management (PRM) and ERM in the construction industry, and examines their linkages for international construction operations in a broader context. The explanation elaborates on how companies may adopt and implement RM, PRM and ERM as appropriate in their various operations, both in their home market as well as in overseas host markets. The book also reviews the whole spectrum of work relating to organizational behavior (OB) as one of the key underpinnings for companies to evaluate and implement ERM. It will benefit practitioners from the industry as well as academics interested in the implementation of ERM practices in international construction operat...

  5. BR3/Vulcain Nuclear Power Station. Construction and Operational Experience

    Energy Technology Data Exchange (ETDEWEB)

    Storrer, J. [Belgonucleaire, S.A., Brussels (Belgium)

    1968-04-15

    A full-scale reactor experiment was set out as the main objective of the Vulcain research and development programme agreed in May 1962 between the UKAEA and BelgoNucleaire, manager of ''Syndicat Vulcain''. Vulcain uses variable moderation as the long-term method to control reactivity: the reactor is cooled and moderated by a mixture of heavy and light water, the D{sub 2}O content being stepwise reduced to permit power operation with all control rods completely out of the core. To carry out the Vulcain power experiment it was decided to modify the BR3 nuclear power plant located at Mol, Belgium, which had operated from 1962 to 1964 as a conventional PWR with outputs of 40.9 MW(th) and 11.45 MW(e). The BR3/Vulcain plant was started in December 1966 and since then is running with a load factor around 90%. It is the first time that such a reactor type has been built and operated and the experience gained by its design, construction, commissioning and operation has proven to be most valuable. D{sub 2}O is being used at a pressure (2000 lb/in{sup 2} abs.) never before achieved in a heavy-water reactor and the leak rate from the HP primary systems to the atmosphere has been kept to a negligible value, around 1 to 2 grams/h. Commissioning of the primary plant had been carried out with light water first without fuel, and thereafter with fuel, at which time the water was poisoned with boric acid. The reactor vessel contains experimental devices such as 65 in-pile instrumentation detectors and four hydraulically operated Zircaloy control rods. They required the interposition of a collar between the vessel and its lid. Refuelling is performed under boronated light water, the interchange between the primary water and the H{sub 2}O being carried out by means of a draining and spraying system. The reactor had been operated for two years before its modifications for Vulcain: many lessons have therefore been learned about working on irradiated systems. The BR3/Vulcain core has a

  6. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    International Nuclear Information System (INIS)

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  7. Commissioning and operational results of the 12 GeV helium compression system at Jlab

    Energy Technology Data Exchange (ETDEWEB)

    Knudsen, Peter N. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Ganni, Venkatarao [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Dixon, Kelly D. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Norton, Robert O. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Creel, Jonathan D. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

    2015-12-01

    The new compressor system at Jefferson Lab (JLab) for the 12 GeV upgrade was commissioned in the spring of 2013 and incorporates many design changes, discussed in previous publications, to improve the operational range, efficiency, reliability and maintainability as compared to previous compressor skids used for this application. The 12 GeV helium compression system has five compressors configured with four pressure levels supporting three pressure levels in the new cold box. During compressor commissioning the compressors were operated independent of the cold box over a wide range of process conditions to verify proper performance including adequate cooling and oil removal. Isothermal and volumetric efficiencies over these process conditions for several built-involume ratios were obtained. This paper will discuss the operational envelope results and the modifications/improvements incorporated into the skids.

  8. Technical management on commissioning test of nuclear heating reactor

    International Nuclear Information System (INIS)

    Zhang Yajun; Su Qingshan

    1999-01-01

    The commissioning is the last construction stage of a nuclear heating project. The commissioning quality will directly affect on the safe operation and availability of the heating reactor. The author presents the whole test process until the completion of the test report from the point of test documents, including the preparation and execution of the test, the management of the various unexpected events during the test. And it will be emphatically discussed that the managing procedures of the various unexpected events during the test, including temporary control change, setpoint change, unexpected events and design change

  9. Design, Construction and Commissioning of the Digital Hadron Calorimeter - DHCAL

    CERN Document Server

    Adams, C; Bilki, B.; Butler, J.; Corriveau, F.; Cundiff, T.; Drake, G.; Francis, K.; Furst, B.; Guarino, V.; Haberichter, B.; Hazen, E.; Hoff, J.; Holm, S.; Kreps, A.; DeLurgio, P.; Matijas, Z.; Monte, L.Dal; Mucia, N.; Norbeck, E.; Northacker, D.; Onel, Y.; Pollack, B.; Repond, J.; Schlereth, J.; Skrzecz, F.; Smith, J.R.; Trojand, D.; Underwood, D.; Velasco, M.; Walendziak, J.; Wood, K.; Wu, S.; Xia, L.; Zhang, Q.; Zhao, A.

    2016-01-01

    A novel hadron calorimeter is being developed for future lepton colliding beam detectors. The calorimeter is optimized for the application of Particle Flow Algorithms (PFAs) to the measurement of hadronic jets and features a very finely segmented readout with 1 x 1 cm2 cells. The active media of the calorimeter are Resistive Plate Chambers (RPCs) with a digital, i.e. one-bit, readout. To first order the energy of incident particles in this calorimeter is reconstructed as being proportional to the number of pads with a signal over a given threshold. A large-scale prototype calorimeter with approximately 500,000 readout channels has been built and underwent extensive testing in the Fermilab and CERN test beams. This paper reports on the design, construction, and commissioning of this prototype calorimeter.

  10. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  11. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    Energy Technology Data Exchange (ETDEWEB)

    Degraff, Brian D. [ORNL; Howell, Matthew P. [ORNL; Kim, Sang-Ho [ORNL; Neustadt, Thomas S. [ORNL

    2017-07-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinney pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.

  12. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    Science.gov (United States)

    DeGraff, B.; Howell, M.; Kim, S.; Neustadt, T.

    2017-12-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinney pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.

  13. Construal operations of the English progressive construction

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard

    2011-01-01

    present paper provides an overview of construal operations that are likely to be at play in the construction of the aspectual and actional meaning components of the progressive construction. The discussion also involves instances of the progressive construction, which display low semantic compatibility...

  14. ATF2 Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  15. ATF2 COMMISSIONING

    CERN Document Server

    Seryi, A; Parker, B; Schulte, D; Delahaye, J P; Tomas, R; Zimmermann, F; Wolski, A; Elsen, E; Sanuki, T; Gianfelice-Wendt, E; Ross, M; Wendt, M; Takahashi, T; Bai, S; Gao, J; Bolzon, B; Geffroy, N; Jeremie, A; Apsimon, R; Burrows, P; Constance, B; Perry, C; Resta-Lopez, J; Swinson, C; Araki, S; Aryshev, A; Hayano, H; Honda, Y; Kubo, K; Kume, T; Kuroda, S; Masuzawa, M; Naito, T; Okugi, T; Sugahara, R; Tauchi, T; Terunuma, N; Urakawa, J; Yokoya, K; Iwashita, Y; Sugimoto, T; Heo, A Y; Kim, E S; Kim, H S; Bambade, P; Renier, Y; Rimbault, C; Huang, J Y; Kim, S H; Park, Y J; Hwang, W H; Blair, G; Boogert, S; Karataev, P; Molloy, S; Amann, J; Bellomo, P; Lam, B; McCormick, D; Nelson, J; Paterson, E; Pivi, M; Raubenheimer, T; Spencer, C; Wang, M H; White, G; Wittmer, W; Woodley, M; Yan, Y; Zhou, F; Angal-Kalinin, D; Jones, J; Lyapin, A; Scarfe, A; Kamiya, Y; Komamiya, S; Oroku, M; Suehara, T; Yamanaka, T

    2010-01-01

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  16. Construction and commissioning test report of the CEDM test facility

    Energy Technology Data Exchange (ETDEWEB)

    Chung, C. H.; Kim, J. T.; Park, W. M.; Youn, Y. J.; Jun, H. G.; Choi, N. H.; Park, J. K.; Song, C. H.; Lee, S. H.; Park, J. K

    2001-02-01

    The test facility for performance verification of the control element drive mechanism (CEDM) of next generation power plant was installed at the site of KAERI. The CEDM was featured a mechanism consisting of complicated mechanical parts and electromagnetic control system. Thus, a new CEDM design should go through performance verification tests prior to it's application in a reactor. The test facility can simulate the reactor operating conditions such as temperature, pressure and water quality and is equipped with a test chamber to accomodate a CEDM as installed in the power plant. This test facility can be used for the following tests; endurance test, coil cooling test, power measurement and reactivity rod drop test. The commissioning tests for the test facility were performed up to the CEDM test conditions of 320 C and 150 bar, and required water chemistry was obtained by operating the on-line water treatment system.

  17. Construction and commissioning test report of the CEDM test facility

    International Nuclear Information System (INIS)

    Chung, C. H.; Kim, J. T.; Park, W. M.; Youn, Y. J.; Jun, H. G.; Choi, N. H.; Park, J. K.; Song, C. H.; Lee, S. H.; Park, J. K.

    2001-02-01

    The test facility for performance verification of the control element drive mechanism (CEDM) of next generation power plant was installed at the site of KAERI. The CEDM was featured a mechanism consisting of complicated mechanical parts and electromagnetic control system. Thus, a new CEDM design should go through performance verification tests prior to it's application in a reactor. The test facility can simulate the reactor operating conditions such as temperature, pressure and water quality and is equipped with a test chamber to accomodate a CEDM as installed in the power plant. This test facility can be used for the following tests; endurance test, coil cooling test, power measurement and reactivity rod drop test. The commissioning tests for the test facility were performed up to the CEDM test conditions of 320 C and 150 bar, and required water chemistry was obtained by operating the on-line water treatment system

  18. Facility design, construction, and operation

    International Nuclear Information System (INIS)

    1995-04-01

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l'Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l'Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, including uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec's contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides' all of the basic information in these areas and reflects actual experience to date

  19. 77 FR 22573 - Information Collections Being Reviewed by the Federal Communications Commission Under Delegated...

    Science.gov (United States)

    2012-04-16

    .... Privacy Impact Assessment(s): No impact(s). Nature and Extent of Confidentiality: There is no need for... to notify the Commission in writing when the station commences operation. Such notification shall be... time to complete construction of the station and commence operation shall request an extension of time...

  20. The design, construction, and commissioning of a multi-use cyclotron facility

    International Nuclear Information System (INIS)

    Ho, S.; Hutcheson, M.; Schick-Martin, D.; Dalzell, M.; Alexander, N.

    2015-01-01

    The Sylvia Fedoruk Canadian Centre for Nuclear Innovation in Saskatchewan is in the process of commissioning the Saskatchewan Centre for Cyclotron Sciences that is to be used for both academic research and commercial radiopharmaceutical production. The hybrid nature of this facility comes with unique challenges in satisfying both the rigid demands of pharmaceutical production while providing the necessary flexibility for academic research. In order to meet these competing demands, the Fedoruk Centre has assembled a distinct combination of skill sets and areas of expertise to operate a facility with an interdisciplinary focus. (author)

  1. Design, commissioning and operation of the Swiss Light Source SLS

    International Nuclear Information System (INIS)

    Streun, Andreas

    2003-01-01

    The Swiss Light Source (SLS) at the Paul Scherrer Institute (PSI) is the most recent 3rd generation light source coming to operation. It consists of a 12- TBA storage ring of 288 m circumference providing 5 nm rad emittance at 2.4 GeV, a novel type of full energy booster synchrotron and a 100 MeV linac. The initial four beamlines cover protein X-ray crystallography (PX), materials science (MS), surface and interface spectroscopy (SIS) and microscopy (SIM). We will review the project history, describe the design concepts of the accelerators and the technical subsystems, and report on the commissioning process and the status of operation by end of 2002. (author)

  2. Design, construction and operation features of high-rise structures

    Science.gov (United States)

    Mylnik, Alexey; Mylnik, Vladimir; Zubeeva, Elena; Mukhamedzhanova, Olga

    2018-03-01

    The article considers design, construction and operation features of high-rise facilities. The analysis of various situations, that come from improper designing, construction and operation of unique facilities, is carried out. The integrated approach is suggested, when the problems of choosing acceptable constructional solutions related to the functional purpose, architectural solutions, methods of manufacturing and installation, operating conditions for unique buildings and structures are being tackled. A number of main causes for the emergency destruction of objects under construction and operation is considered. A number of measures are proposed on the basis of factor classification in order to efficiently prevent the situations, when various negative options of design loads and emergency impacts occur.

  3. Construction and commissioning of a hadronic test-beam calorimeter to validate the particle-flow concept at the ILC

    International Nuclear Information System (INIS)

    Groll, M.

    2007-06-01

    This thesis discusses research and development studies performed for a hadronic calorimeter concept for the International Linear Collider (ILC). The requirements for a detector for the ILC are de ned by the particle-ow concept in which the overall detector performance for jet reconstruction is optimised by reconstructing each particle individually. The calorimeter system has to have unprecedented granularity to ful l the task of shower separation. The validation of the shower models used to simulate the detector performance is mandatory for the design and optimisation of the ILC detector. The construction and operation of a highly granular test-beam system will serve as a tool for this validation. This motivates the urgent need of research and development on calorimeter prototypes. One possible realisation of the hadronic calorimeter is based on a sampling structure of steel and plastic scintillator with analogue readout, where the sensitive scintillator layers are divided into tiles. A newly developed silicon based photo-detector (SiPM) o ers the possibilities to design such a system. The SiPM is a multi-pixel avalanche photo-diode operated in Geiger mode. Due to its small dimensions it is possible to convert the light produced in the calorimeter to an electronic signal already inside the calorimeter volume. The basic developments on scintillator, tile and photo-detector studies provide the basis for prototype construction. The main part of this thesis will discuss the construction and rst commissioning of an analogue hadronic calorimeter prototype consisting of 8000 channels read out with SiPMs. The smallest calorimeter unit is the tile system including the SiPM. The production and characterisation chain of this unit is an essential step in the construction of a large scale prototype. These basic units are arranged on readout layers, which are already a multi-channel system of 200 channels. In addition, the new photo-detector requires dedicated readout

  4. Construction and commissioning of a hadronic test-beam calorimeter to validate the particle-flow concept at the ILC

    Energy Technology Data Exchange (ETDEWEB)

    Groll, M.

    2007-06-15

    This thesis discusses research and development studies performed for a hadronic calorimeter concept for the International Linear Collider (ILC). The requirements for a detector for the ILC are de ned by the particle-ow concept in which the overall detector performance for jet reconstruction is optimised by reconstructing each particle individually. The calorimeter system has to have unprecedented granularity to ful l the task of shower separation. The validation of the shower models used to simulate the detector performance is mandatory for the design and optimisation of the ILC detector. The construction and operation of a highly granular test-beam system will serve as a tool for this validation. This motivates the urgent need of research and development on calorimeter prototypes. One possible realisation of the hadronic calorimeter is based on a sampling structure of steel and plastic scintillator with analogue readout, where the sensitive scintillator layers are divided into tiles. A newly developed silicon based photo-detector (SiPM) o ers the possibilities to design such a system. The SiPM is a multi-pixel avalanche photo-diode operated in Geiger mode. Due to its small dimensions it is possible to convert the light produced in the calorimeter to an electronic signal already inside the calorimeter volume. The basic developments on scintillator, tile and photo-detector studies provide the basis for prototype construction. The main part of this thesis will discuss the construction and rst commissioning of an analogue hadronic calorimeter prototype consisting of 8000 channels read out with SiPMs. The smallest calorimeter unit is the tile system including the SiPM. The production and characterisation chain of this unit is an essential step in the construction of a large scale prototype. These basic units are arranged on readout layers, which are already a multi-channel system of 200 channels. In addition, the new photo-detector requires dedicated readout

  5. Assembly, commissioning and first operation of JET

    International Nuclear Information System (INIS)

    Huguet, M.

    1983-01-01

    A brief summary of the work carried out during the construction phase of JET is first given. This period was successfully concluded due to the well timed delivery by industry of all the major parts of the machine and power supplies. This could be achieved because of the excellent technical co-operation between the JET team and the firms involved in construction work. The assembly of the JET machine started on site in January 1982 immediately after civil engineering work was completed. Great attention was devoted to the preparation of the vacuum vessel octants. After delivery, they were carefully cleaned, baked and leak tested at 500 0 C, and then fitted with instrumentation, electrical heater cables and thermal insulation, in view of the bake-out of the complete vessel after final assembly

  6. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements (Arabic Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe commissioning, operation, and transition from operation to decommissioning of nuclear power plants. Over recent years there have been developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis review and risk informed decision making processes. It became necessary to revise the IAEA’s Safety Requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications, initiated in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan, revealed no significant areas of weakness but resulted in a small set of amendments to strengthen the requirements and facilitate their implementation. These are contained in the present publication.

  7. Commissioning and Operation of the FNAL Front end Injection Line and Ion Sources.

    Energy Technology Data Exchange (ETDEWEB)

    Karns, Patrick R. [Indiana Univ., Bloomington, IN (United States)

    2015-09-01

    This thesis documents the efforts made in commissioning and operating the RFQ Injection Line (RIL) as a replacement for the Cockcroft Walton front end. The Low Energy Beam Transport (LEBT) was assembled and tested with multiwire position and emittance monitor measurements. The Radio Frequency Quadrupole (RFQ) commissioning was completed with the same measurements as well as output beam energy measurements that showed it initially accelerated beam only to 700 keV, which was 50 keV lower than the design energy. Working with the manufacturer solutions were found and instituted to continue testing. The Medium Energy Beam Transport (MEBT) was then connected as the RIL was installed as the new front end of Linac. Testing gave way to operation when the new front end was used as the source of all High Energy Physics (HEP) beam for Fermi National Accelerator Laboratory (FNAL). The magnetron ion source that provides the H- beam for the front end required several changes and eventual upgrades to operate well; such as new source operating points for vacuum pressure and cesium admixture, and new materials for critical source components. Further research was conducted on the cathode geometry and nitrogen doping of the hydrogen gas as well as using solid state switches for the extractor system high voltage.

  8. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    Science.gov (United States)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  9. Commissioning and operational scenarios of the LHC beam loss monitor system

    International Nuclear Information System (INIS)

    Holzer, E.B.

    2007-01-01

    One of the most critical elements for the protection of CERN's Large Hadron Collider (LHC) is its beam loss monitoring (BLM) system. It must prevent quenches in the super conducting magnets and damage of machine components due to beam losses. The contribution will discuss the commissioning procedures of the BLM system and envisaged operational scenarios. About 4000 monitors will be installed around the ring. When the loss rate exceeds a predefined threshold value, a beam abort is requested. Magnet quench and damage levels vary as a function of beam energy and loss duration. Consequently, the beam abort threshold values vary accordingly. By measuring the loss pattern, the BLM system helps to identify the loss mechanism. Furthermore, it will be an important tool for commissioning, machine setup and studies. Special monitors will be used for the setup and control of the collimators. (author)

  10. Design, Construction, Installation and First Commissioning Results of the LHC Cryogenic System

    CERN Document Server

    Claudet, S

    2006-01-01

    The cryogenic system of the Large Hadron Collider (LHC) will be, upon its completion in 2006, the largest in the world in terms of refrigeration capacity with an equivalent to 144 kW at 4.5 K, about 400'000 litres of superfluid helium with 25 km of superconducting magnets below 2 K leading to a cryogen inventory of 100 tons of helium. The challenges involved in the design, construction and installation, as well as the first commissioning results will be addressed in this talk. Particular mention will be made of the problems encountered and how they were or are being solved. Perspectives for LHC will be presented. General considerations for future large cryogenic systems will be briefly proposed.

  11. Construction and commissioning of the CALICE analog hadron calorimeter prototype

    International Nuclear Information System (INIS)

    Adloff, C.; Karyotakis, Y.

    2010-03-01

    An analog hadron calorimeter (AHCAL) prototype of 5.3 nuclear interaction lengths thickness has been constructed by members of the CALICE Collaboration. The AHCAL prototype consists of a 38-layer sandwich structure of steel plates and highlysegmented scintillator tiles that are read out by wavelength-shifting fibers coupled to SiPMs. The signal is amplified and shaped with a custom-designed ASIC. A calibration/ monitoring system based on LED light was developed to monitor the SiPM gain and to measure the full SiPM response curve in order to correct for non-linearity. Ultimately, the physics goals are the study of hadron shower shapes and testing the concept of particle flow. The technical goal consists of measuring the performance and reliability of 7608 SiPMs. The AHCAL was commissioned in test beams at DESY and CERN. The entire prototype was completed in 2007 and recorded hadron showers, electron showers and muons at different energies and incident angles in test beams at CERN and Fermilab. (orig.)

  12. Construction and commissioning of the CALICA analog hadron calorimeter prototype

    Energy Technology Data Exchange (ETDEWEB)

    Adloff, C.; Karyotakis, Y. [Universite de Savoie, Annecy-le-Vieux (France). Laboratoire d' Annecy-le-Vieux de Physique des Particules, CNRS/IN2P3; Repond, J. [Argonne National Laboratory, Argonne, IL (US)] (and others)

    2010-03-15

    An analog hadron calorimeter (AHCAL) prototype of 5.3 nuclear interaction lengths thickness has been constructed by members of the CALICE Collaboration. The AHCAL prototype consists of a 38-layer sandwich structure of steel plates and highlysegmented scintillator tiles that are read out by wavelength-shifting fibers coupled to SiPMs. The signal is amplified and shaped with a custom-designed ASIC. A calibration/ monitoring system based on LED light was developed to monitor the SiPM gain and to measure the full SiPM response curve in order to correct for non-linearity. Ultimately, the physics goals are the study of hadron shower shapes and testing the concept of particle flow. The technical goal consists of measuring the performance and reliability of 7608 SiPMs. The AHCAL was commissioned in test beams at DESY and CERN. The entire prototype was completed in 2007 and recorded hadron showers, electron showers and muons at different energies and incident angles in test beams at CERN and Fermilab. (orig.)

  13. Construction and Commissioning of the CALICE Analog Hadron Calorimeter Prototype

    CERN Document Server

    Adloff, C.; Repond, J.; Brandt, A.; Brown, H.; De, K.; Medina, C.; Smith, J.; Li, J.; Sosebee, M.; White, A.; Yu, J.; Buanes, T.; Eigen, G.; Mikami, Y.; Miller, O.; Watson, N.K.; Wilson, J.A.; Goto, T.; Mavromanolakis, G.; Thomson, M.A.; Ward, D.R.; Yan, W.; Benchekroun, D.; Hoummada, A.; Khoulaki, Y.; Oreglia, M.; Benyamna, M.; Carloganu, C.; Gay, P.; Ha, J.; Blazey, G.C.; Chakraborty, D.; Dyshkant, A.; Francis, K.; Hedin, D.; Lima, G.; Zutshi, V.; Babkin, V.A.; Bazylev, S.N.; Fedotov, Yu I.; Slepnev, V.M.; Tiapkin, I.A.; Volgin, S.V.; Hostachy, J.Y.; Morin, L.; D'Ascenzo, N.; Cornett, U.; David, D.; Fabbri, R.; Falley, G.; Feege, N.; Gadow, K.; Garutti, E.; Gottlicher, P.; Jung, T.; Karstensen, S.; Korbel, V.; Lucaci-Timoce, A.I.; Lutz, B.; Meyer, N.; Morgunov, V.; Reinecke, M.; Schatzel, S.; Schmidt, S.; Sefkow, F.; Smirnov, P.; Vargas-Trevino, A.; Wattimena, N.; Wendt, O.; Groll, M.; Heuer, R.D.; Richter, S.; Samson, J.; Kaplan, A.; Schultz-Coulon, H.Ch; Shen, W.; Tadday, A.; Bilki, B.; Norbeck, E.; Onel, Y.; Kim, E.J.; Kim, G.; Kim, D.W.; Lee, K.; Lee, S.C.; Kawagoe, K.; Tamura, Y.; Ballin, J.A.; Dauncey, P.D.; Magnan, A.M.; Yilmaz, H.; Zorba, O.; Bartsch, V.; Postranecky, M.; Warren, M.; Wing, M.; Faucci Giannelli, M.; Green, M.G.; Salvatore, F.; Kieffer, R.; Laktineh, I.; Fouz, M.C.; Bailey, D.S.; Barlow, R.J.; Thompson, R.J.; Batouritski, M.; Dvornikov, O.; Shulhevich, Yu; Shumeiko, N.; Solin, A.; Starovoitov, P.; Tchekhovski, V.; Terletski, A.; Bobchenko, B.; Chadeeva, M.; Danilov, M.; Markin, O.; Mizuk, R.; Morgunov, V.; Novikov, E.; Rusinov, V.; Tarkovsky, E.; Andreev, V.; Kirikova, N.; Komar, A.; Kozlov, V.; Smirnov, P.; Soloviev, Y.; Terkulov, A.; Buzhan, P.; Dolgoshein, B.; Ilyin, A.; Kantserov, V.; Kaplin, V.; Karakash, A.; Popova, E.; Smirnov, S.; Baranova, N.; Boos, E.; Gladilin, L.; Karmanov, D.; Korolev, M.; Merkin, M.; Savin, A.; Voronin, A.; Topkar, A.; Frey, A.; Kiesling, C.; Lu, S.; Prothmann, K.; Seidel, K.; Simon, F.; Soldner, C.; Weuste, L.; Bouquet, B.; Callier, S.; Cornebise, P.; Dulucq, F.; Fleury, J.; Li, H.; Martin-Chassard, G.; Richard, F.; de la Taille, Ch.; Poeschl, R.; Raux, L.; Ruan, M.; Seguin-Moreau, N.; Wicek, F.; Anduze, M.; Boudry, V.; Brient, J.C.; Gaycken, G.; Cornat, R.; Jeans, D.; Mora de Freitas, P.; Musat, G.; Reinhard, M.; Rouge, A.; Vanel, J.Ch; Videau, H.; Park, K.H.; Zacek, J.; Cvach, J.; Gallus, P.; Havranek, M.; Janata, M.; Kvasnicka, J.; Marcisovsky, M.; Polak, I.; Popule, J.; Tomasek, L.; Tomasek, M.; Ruzicka, P.; Sicho, P.; Smolik, J.; Vrba, V.; Zalesak, J.; Arestov, Yu; Ammosov, V.; Chuiko, B.; Gapienko, V.; Gilitski, Y.; Koreshev, V.; Semak, A.; Sviridov, Yu; Zaets, V.; Belhorma, B.; Belmir, M.; Baird, A.; Halsall, R.N.; Nam, S.W.; Park, I.H.; Yang, J.; Chai, J.S.; Kim, J.T.; Kim, G.B.; Kim, Y.; Kang, J.; Kwon, Y.J.; Kim, I.; Lee, T.; Park, J.; Sung, J.; Itoh, S.; Kotera, K.; Nishiyama, M.; Takeshita, T.; Weber, S.; Zeitnitz, C.

    2010-01-01

    An analog hadron calorimeter (AHCAL) prototype of 5.3 nuclear interaction lengths thickness has been constructed by members of the CALICE Collaboration. The AHCAL prototype consists of a 38-layer sandwich structure of steel plates and highly-segmented scintillator tiles that are read out by wavelength-shifting fibers coupled to SiPMs. The signal is amplified and shaped with a custom-designed ASIC. A calibration/monitoring system based on LED light was developed to monitor the SiPM gain and to measure the full SiPM response curve in order to correct for non-linearity. Ultimately, the physics goals are the study of hadron shower shapes and testing the concept of particle flow. The technical goal consists of measuring the performance and reliability of 7608 SiPMs. The AHCAL was commissioned in test beams at DESY and CERN. The entire prototype was completed in 2007 and recorded hadron showers, electron showers and muons at different energies and incident angles in test beams at CERN and Fermilab.

  14. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  15. Concept for the generation of the model designated for the simulation of interaction between enterprises comprising one major construction company

    Directory of Open Access Journals (Sweden)

    Dubovkina Alla Viktorovna

    2014-12-01

    Full Text Available The author offers an original concept designated for the generation of the model designated to simulate interaction between the enterprises comprising one major construction company within the framework of the production and logistics chain, comprising production facilities, transport enterprises, construction and assembly companies. The author has identified the factors that may produce an adverse effect on construction operations or cause untimely commissioning of a construction facility. The author employed methods of mathematics to describe the operations performed by each constituent enterprise. A graphic model describing each operation was compiled through the integration of mathematical functions. The model binds specific operations, performed by constituent companies, to deadlines, drives attention to interaction bottlenecks, and makes adjustments to assure reliable attainment of the main goal, that is, the timely commissioning of a construction facility.

  16. Commissioning and operating experience of compressed air system of a reprocessing plant (Paper No. 5.10)

    International Nuclear Information System (INIS)

    Nair, M.K.T.; Bajpai, D.D.; Mishra, A.K.; Kulkarni, H.B.; Raje, R.V.; Rajeshwar, S.

    1992-01-01

    Compressed air system is one of the most important utility systems, required in the continued operation of a radiochemical plant. Moisture and oil free compressed air is used in large scale for process control and process operations in reprocessing plants. Commissioning and operating experience of this system is described in detail, to indicate the importance of the system in the overall design and operation of such chemical plant. (author). 1 tab

  17. Indexes to Commission issuances, October 8, 1956--January 18, 1975

    International Nuclear Information System (INIS)

    1978-05-01

    The document contains digests and indexes for regulatory decisions of the Atomic Energy Commission and its hearing examiners rendered under the Atomic Energy Act of 1954 and published in ATOMIC ENERGY COMMISSION REPORTS, Volumes 1 through 8 covering 1956 through January 1975. Information elements common to the cases heard and ruled upon are (1) case names (owners of facility); (2) name of facility, docket number; (3) type of hearing (for construction permit, operating license, etc.); (4) issues raised by appellants; (5) issuance number; (6) type of issuance (memorandum, order, decision, etc.); (7) issuance pagination; (8) legal citations (cases, regulations, and statutes); and (9) subject matter of issues and/or rulings

  18. Co-operation Agreement relating to LHC Commissioning

    CERN Multimedia

    2005-01-01

    CERN Director-General Robert Aymar and Ryszard Tadeusiewicz, the Rector of the AGH University of Science and Technology in Cracow, after signing the agreement. On 29 July, the Rector of the AGH University of Science and Technology in Cracow, Ryszard Tadeusiewicz, and CERN Director-General Robert Aymar signed a collaboration agreement relating to the commissioning of the instrumentation and monitoring equipment for the LHC cryogenic system. Under the agreement, a team consisting of a dozen physicists, engineers and technicians from the AGH University in Cracow will lend a helping hand to the teams at CERN for the commissioning of the cryogenic system in the tunnel. This is the first in what will be a series of agreements relating to the commissioning of the LHC's various systems. From the end of this year until the summer of 2007, CERN will require reinforcements of physicists, engineers and technicians in order to complete the many tasks associated with the start-up of the accelerator. CERN is therefore pre...

  19. Commissioning of NSLS-II

    Energy Technology Data Exchange (ETDEWEB)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  20. U.S. EPR ITAAC: coordination with construction and startup

    International Nuclear Information System (INIS)

    Magnarelli, D.; Levin, A.E.

    2007-01-01

    The 10 CFR 52 process provides for a single combined license (COL) to be granted prior to the beginning of construction. Incorporated into the COL is a set of inspections, tests, analyses and acceptance criteria (ITAAC) which, when satisfied, provide the Nuclear Regulatory Commission (NRC) with reasonable assurance that the completed plant has been constructed properly and will operate safely in accordance with the terms of the license. The licensee performs the inspections, tests and analyses, and determines that the acceptance criteria have been fulfilled; the NRC must make a finding that the ITAAC requirements have been satisfied before fuel loading at the nuclear power plant is permitted. The challenge is that the concept of ITAAC is new and not well defined. This paper addresses some of the ITAAC issues for the U.S. EPR approach for coordination of ITAAC with design, procurement, construction and startup activities to ensure timely approval of fuel loading and commissioning for plant operation. (authors)

  1. Enhancement of organizational and technical solutions regarding anchoring of completed construction facilities of underground railway system to operating control

    Directory of Open Access Journals (Sweden)

    Е. Г. Козин

    2017-12-01

    Full Text Available Stages of practical realization of measures prescribed by requirements documents regarding anchoring of capital structures of underground railway system to operating control are considered in the article. On the basis of algorithm structure analysis, which includes obtaining a permit for putting into operation and cadastre works execution a range of solutions was proposed concerning optimization of construction project owner and operating organization activities with the purpose of terms reduction of capital structures handover to operation. The results of work of a commission responsible for completed underground railway system objects acceptance and putting into operation were analyzed. Considering example of object «Second entrance hall area of «Sportivnaya» station the statistical data of revealed snagging items is consolidated and dynamics of corrective actions is provided.Proposed solutions laid the foundation for corrections of requirements documents and were accepted for realization in the process of works acceptance of Saint-Petersburg underground railway system objects.

  2. Kemeny commission report. Comments by NPC (Nuclear Power Company)

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    Following the accident at Three Mile island in March 1979 the Nuclear Power Company (NPC) has made evaluations of the available information and carried out preliminary investigations of the implications of the accident for all UK AGR's and for the PWR design. The results are summarized. Recommendations of the President's Commission are discussed with especial reference to those under the following headings: (1) The utility and its suppliers. (2) Training of operating personnel. (3) Technical assessment. It is concluded that while many of the relevant recommendations in the report of the President's Commission are already satisfied by UK practices for nuclear safety, and are being applied by NPC in their current programmes of work on AGR's and PWR's it is realised that it is of the utmost importance that complacent attitudes to safety are not allowed to develop. The accident at TMI and report of the Commision have provided a sharp reminder of the necessity to maintain unremitting vigilance in all aspects of design, construction and operation which are involved with the safety of the public and operators.

  3. Survey on the virtual commissioning of manufacturing systems

    Directory of Open Access Journals (Sweden)

    Chi G. Lee

    2014-07-01

    Full Text Available This paper reviews and identifies issues in the application of virtual commissioning technology for automated manufacturing systems. While the real commissioning of a manufacturing system involves a real plant system and a real controller, the virtual commissioning deals with a virtual plant model and a real controller. The expected benefits of virtual commissioning are the reduction of debugging and correction efforts during the subsequent real commissioning stage. However, it requires a virtual plant model and hence still requires significant amount time and efforts. Two main issues are identified, the physical model construction of a virtual device, and the logical model construction of a virtual device. This paper reviews the current literature related to the two issues and proposes future research directions to achieve the full utilization of virtual commissioning technology.

  4. Commissioning of the LHC Cryogenic System Subsystems Cold Commissioning in Preparation of Full Sector Tests

    CERN Document Server

    Serio, L; Ferlin, G; Gilbert, N; Gruehagen, Henning; Knoops, S; Parente, C; Sanmartí, M

    2006-01-01

    The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distributed around the 26.7-km circumference ring located in a deep underground tunnel. The status of the cryogenic system commissioning is presented together with the experience gained in operating and commissioning it.

  5. Quality assurance during site construction. Pt. 6

    International Nuclear Information System (INIS)

    Schwarz, N.

    1980-01-01

    Scope of 'Site Construction concerning Electrical Equipment' (Installation, erection, commissioning, operation): tasks and organization of Siemens-Field Services Division; organization on site; receiving, incoming inspection and storage of material; installation, erection; (drawings, instructions, documents / execution of installation / personnel qualification). Non conformance and corrective actions; quality records; internal audits. (orig.)

  6. Nuclear Regulatory Commission Issuances. Opinions and decisions of the Nuclear Regulatory Commission with selected orders: July 1, 1992--December 31, 1992, Volume 36, Pages 1--396

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967.

  7. The KLOE-2 Inner Tracker: Detector commissioning and operation

    Energy Technology Data Exchange (ETDEWEB)

    Balla, A.; Bencivenni, G. [Laboratori Nazionali di Frascati dell' INFN, Frascati (Italy); Branchini, P. [INFN Sezione di Roma Tre, Roma (Italy); Ciambrone, P. [Laboratori Nazionali di Frascati dell' INFN, Frascati (Italy); Czerwinski, E. [Jagiellonian University, Institute of Physics, Cracow (Poland); De Lucia, E. [Laboratori Nazionali di Frascati dell' INFN, Frascati (Italy); Cicco, A. [Dipartimento di Matematica e Fisica dell' Università di “Roma Tre”, Roma (Italy); Di Domenici, D.; Felici, G.; Morello, G. [Laboratori Nazionali di Frascati dell' INFN, Frascati (Italy)

    2017-02-11

    The KLOE-2 experiment started its data taking campaign in November 2014 with an upgraded tracking system including an Inner Tracker built with the cylindrical GEM technology, to operate together with the Drift Chamber improving the apparatus tracking performance. The Inner Tracker is composed of four cylindrical triple-GEM, each provided with an X–V strips-pads stereo readout and equipped with the GASTONE ASIC developed inside the KLOE-2 collaboration. Although GEM detectors are already used in high energy physics experiment, this device is considered a frontier detector due to its cylindrical geometry: KLOE-2 is the first experiment to use this novel solution. The results of the detector commissioning, detection efficiency evaluation, calibration studies and alignment, both with dedicated cosmic-ray muon and Bhabha scattering events, will be reported.

  8. Control system user interface for accelerator commissioning and operation

    International Nuclear Information System (INIS)

    Dobrott, D.; Keeley, D.; Kolte, G.; Mikic, Z.; Lee, M.; Corbett, J.; Howry, S.; King, A.

    1991-01-01

    An Interactive Accelerator Interface Module (AIM) has been developed in a workstation environment for the purposes of assisting in the commissioning and operation of any storage ring/collider system. The function of AIM is to integrate modeling and simulation codes into accelerator and beamline control systems for the purpose of rapid on-line data analysis and error-correction, resulting in significant time-saving. A system dependent module provides for the translation of specific control system data files to appropriate input format for application programs within AIM. Interactive screen graphics, including system function diagrams, menus, beamline element status and update information are standard in AIM. AIM is currently connected to the Stanford Linear Collider (SLC) control system, but is easily transportable to other facilities. This paper describes the development of AIM and its applications on SLC

  9. DESY: HERA commissioning

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The commissioning of the world's first electron-proton collider - the 6.3 kilometre HERA ring at the DESY Laboratory in Hamburg - last year was the result of more than a decade of careful planning, design and construction

  10. Commissioning and First Operation of the Low-Beta Triplets and Their Electrical Feed Boxes at the Large Hadron Collider

    CERN Document Server

    Darve, C; Casas-Cubillos, J; Claudet, S; Feher, S; Ferlin, G; Kerby, J; Metral, L; Perin, A; Peterson, T; Prin, H; Rabehl, R; Vauthier, N; Wagner, U; van Weelderen, R

    2010-01-01

    The insertion regions located around the four interaction points of the Large Hadron Collider (LHC) are mainly composed of the low-b triplets, the separation dipoles and their respective electrical feed-boxes (DFBX). The low-b triplets are Nb-Ti superconductor quadrupole magnets, which operate at 215 T/m in superfluid helium at a temperature of 1.9 K. The commissioning and the first operation of these components have been performed. The thermo-mechanical behavior of the low-b triplets and DFBX were studied. Cooling and control systems were tuned to optimize the cryogenic operation of the insertion regions. Hardware commissioning also permitted to test the system response. This paper summarizes the performance results and the lessons learned.

  11. Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade

    International Nuclear Information System (INIS)

    Thomas Powers; Davis, G.; Michael Drury; Christiana Grenoble; Hovater, J.; Lawrence King; Tomasz Plawski; Joseph Preble

    2005-01-01

    Three cryomodules have been designed and built as intermediate prototypes for the CEBAF 12 GeV upgrade. This paper will discuss the commissioning and operational experience with the second of these cryomodules, which was installed and commissioned in the Jefferson Lab 10 kW Free Electron Laser Facility. Within the cryomodule are eight 7-cell, 1497 MHz cavities. It was designed to accelerate 1 mA of beam in excess of 70 MV and to have the same footprint as a standard CEBAF cryomodule. The cryomodule was installed in parallel with the FEL beam line in the spring of 2004 and characterized simultaneous with beam delivery. It was installed in the beam line in the early summer of 2004 and has since been operated as part of an energy recovered linac with 5 mA of beam current and 75 MV accelerating gradient for extended periods of time. Additionally, it was operated at 1 mA of beam current and 80 MV of accelerating gradient for several hours without a trip. In the latter operating mode the beam current was limited by the injector setup

  12. Operational accidents and radiation exposure experience within the United States Atomic Energy Commission, 1943--1975

    International Nuclear Information System (INIS)

    1975-01-01

    The occupational injury and fatality experience during 32 years of the development of the atomic energy industry under the direction of the Atomic Energy Commission (AEC) and its predecessor, the Manhattan Engineering District, is reviewed. Data are included on the cause of all accidents, including fires and transportation accidents, and the cost of AEC property damage. Fatalities of AEC and contractor personnel from all causes during the 32-year period totaled 321, of which 184 occurred in construction; 121 in AEC operations such as production, research, and services; and 16 in Government functions. There were 19,225 lost-time injuries attributable to all accidental causes, or a 32-year frequency rate of 2.75 based on the number of injuries per million man-hours. There were six deaths attributable to nuclear causes, thee of which were due to blast and flying missiles and three caused by whole-body radiation exposure. Forty-one workers were involved in lost-time radiation accidents, of whom 26 showed clinical manifestations attributable to radiation, resulting in permanent partial-disability of three workers and the loss of a digit by four workers, while the others did not develop evidence of radiation injury

  13. Final environmental statement related to the operation of St. Lucie Plant, Unit No. 2. Docket No. 50-389, Florida Power and Light Company, Orlando Utilities Commission of the City of Orlando, Florida

    International Nuclear Information System (INIS)

    1982-04-01

    This final environmental statement was prepared by the US Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation (the staff) in accordance with the Commission's Regulations, set forth in 10 CFR Part 51, which implement the requirements of the National Environmental Policy Act of 1969 (NEPA). Sections related to the aquatic environment were prepared in cooperation with the US Environmental Protection Agency, Region IV. This statement reviews the impact of operation of the St. Lucie Plant, Unit 2. Assessments that are found in this statement supplement those described in the Final Environmental Statement (FES-CP) that was issued in May 1974 in support of issuance of a construction permit for the unit

  14. From use cases of the Joint European Torus towards integrated commissioning requirements of the ITER tokamak

    Energy Technology Data Exchange (ETDEWEB)

    Neto, A.C. [Fusion for Energy, 08019 Barcelona (Spain); Stephen, A. [CCFE, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom); Sartori, F.; Cavinato, M. [Fusion for Energy, 08019 Barcelona (Spain); Farthing, J.W. [CCFE, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom); Ranz, R.; Saibene, G. [Fusion for Energy, 08019 Barcelona (Spain); Winter, A. [ITER Organization, Route de Vinon-sur-Verdon, CS 90 046, 13067 St. Paul Lez Durance Cedex (France); Arnoux, G. [CCFE, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom); Alves, D. [Instituto de Plasmas e Fusão Nuclear, Instituto Superior Técnico, Universidade de Lisboa, 1049-001 Lisboa (Portugal); Blackman, T.; Boboc, A.; Card, P.J.; Dalley, S.; Day, I.E. [CCFE, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom); De Tommasi, G. [Consorzio CREATE/Dipartimento di Ingegneria Elettrica e delle Tecnologie dell’Informazione, Università degli Studi di Napoli Federico II, Via Claudio 21, 80125 Napoli (Italy); Drewelow, P.; Elsmore, C.; Ivings, E.; Felton, R. [CCFE, Culham Science Centre, Abingdon, Oxon OX14 3DB (United Kingdom); and others

    2015-10-15

    The Joint European Torus (JET) is the largest tokamak currently in operation in the world. One of the greatest challenges of JET is the integrated commissioning of all its major plant systems. This is driven, partially, by the size and complexity of its operational infrastructure and also by the fact that, being an international environment, it has to address the issues of integrating, commissioning and maintaining plant systems developed by third parties. The ITER tokamak, now in construction, is a fusion device twice the size of JET and, being a joint effort between the European Union, China, India, Japan, South Korea, the Russian Federation and the USA, it will share on a wider scale all of the JET challenges regarding integration and integrated commissioning of very large and complex plant systems. With the scope of taking advantage from the history and experience of JET, Fusion for Energy (F4E) has worked together with the Culham Centre for Fusion Energy (CCFE), the host and operator of JET, for the provision of ITER relevant user experiences related to the integrated commissioning of the tokamak. This work presents and discusses the main results and the methods that were used to extract and translate the commissioning experience information into ITER requirements.

  15. 32 CFR 10.5 - Construction.

    Science.gov (United States)

    2010-07-01

    ... 32 National Defense 1 2010-07-01 2010-07-01 false Construction. 10.5 Section 10.5 National Defense Department of Defense OFFICE OF THE SECRETARY OF DEFENSE MILITARY COMMISSIONS MILITARY COMMISSION INSTRUCTIONS § 10.5 Construction. Military Commission Instructions shall be construed in a manner consistent...

  16. Activities on the site during construction phase

    International Nuclear Information System (INIS)

    Fickel, O.F.

    1977-01-01

    A survey is given of the work done on the site from site-opening till turn over of the plant to the client. After a short introduction to time schedules, manpower on site, site facilities and civil work and constructions, the commissioning and trial operation phase is discussed in detail. This phase begins with finishing the assembly of individual systems and components and ends with the trial operation and the acceptance measurement. During this period the subsystems are started-up in a useful sequence, first from cold, then from hot conditions and are finally operated as a total with nuclear energy. The single steps are: a) commissioning of indivudal systems; b) hot functional test 1 (without fuels) c) baseline inspection at the reactor pressure vessel; d) hot functional test 2 (with fuels); e) preparation for first criticality; f) postcriticality test program; g) trial operation: h) acceptance measurement. (HP) [de

  17. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  18. Constructive Representation Theory for the Feynman Operator Calculus

    CERN Document Server

    Gill, T L

    2006-01-01

    In this paper, we survey recent progress on the constructive theory of the Feynman operator calculus. We first develop an operator version of the Henstock-Kurzweil integral, and a new Hilbert space that allows us to construct the elementary path integral in the manner originally envisioned by Feynman. After developing our time-ordered operator theory we extend a few of the important theorems of semigroup theory, including the Hille-Yosida theorem. As an application, we unify and extend the theory of time-dependent parabolic and hyperbolic evolution equations. We then develop a general perturbation theory and use it to prove that all theories generated by semigroups are asympotic in the operator-valued sense of Poincar e. This allows us to provide a general theory for the interaction representation of relativistic quantum theory. We then show that our theory can be reformulated as a physically motivated sum over paths, and use this version to extend the Feynman path integral to include more general interaction...

  19. Commissioning and operation of the nuclear physics injector at SLAC

    International Nuclear Information System (INIS)

    Koontz, R.F.; Miller, R.H.; Leger, G.K.; Iverson, R.

    1985-01-01

    The new Nuclear Physics Injector (NPI) approved for construction in October of 1983 was completed by September of 1984, and delivered short pulse beams for SPEAR ring checkout in mid-October. Long pulse beams of up to 1.6 microsecond length were also demonstrated. The paper describes the start-up operation, reviews the performance characteristics, and discusses the beam transport optics used to deliver 1 to 4 GeV beams to nuclear physics experiments in End Station A. The SLAC Nuclear Physics Injector is in full operation!

  20. Constructed wetlands for pollution control: processes, performance, design and operation

    National Research Council Canada - National Science Library

    2000-01-01

    .... Types of constructed wetland, major design parameters, role of vegetation, hydraulic patterns, loadings, treatment efficiency, construction, operation and maintenance costs are discussed in depth...

  1. Commissioning and operational results of helium refrigeration system at JLab for the 12GeV upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Knudsen, Peter N. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Ganni, Venkatarao [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Dixon, Kelly D. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Norton, Robert O. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Creel, Jonathan D. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

    2015-12-01

    The new 4.5 K refrigerator system at the Jefferson Lab (JLab) Central Helium Liquefier (CHL-2) for the 12 GeV upgrade was commissioned in late spring of 2013, following the commissioning of the new compressor system, and has been supporting 12 GeV LINAC commissioning since that time. Six design modes were tested during commissioning, consisting of a maximum capacity, nominal capacity, maximum liquefaction, maximum refrigeration, maximum fill and a stand-by/reduced load condition. The maximum capacity was designed to support a 238 g/s, 30 K and 1.16 bar cold compressor return flow, a 15 g/s, 4.5 K liquefaction load and a 12.6 kW, 35-55 K shield load. The other modes were selected to ensure proper component sizing and selection to allow the cold box to operate over a wide range of conditions and capacities. The cold box system is comprised of two physically independent cold boxes with interconnecting transfer-lines. The outside (upper) 300-60 K vertical cold box has no turbines and incorporates a liquid nitrogen pre-cooler and 80-K beds. The inside (lower) 60-4.5 K horizontal cold box houses seven turbines that are configured in four expansion stages including one Joule-Thompson expander and a 20-K bed. The helium compression system has five compressors to support three pressure levels in the cold box. This paper will summarize the analysis of the test data obtained over the wide range of operating conditions and capacities which were tested.

  2. Personnel organisation of the producer during erection and startup until tuning over to the operator

    International Nuclear Information System (INIS)

    Kirchweger, K.

    1980-01-01

    Description of the contractor's organization for construction and commissioning of a Nuclear Power Plant on a turn-key basis. The timely sequence and the structure of tasks requests the assigment of duties of two separate groups - one for the construction phase and the other for the commissioning phase. Both are part of the contractor's site management. For the construction group terms, tasks and responsibilities will be described at first. Here will be also included a description of the tasks for work safety, quality assurance and control. Secondly the group which is responsible for commissioning and operation will be discussed. Also on the program are duties and powers of the commissioning manager, shift-leaders and the leaders of groups to which special technical tasks are assigned. (orig.) [de

  3. Commission on Legal Matters

    CERN Multimedia

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  4. ITER Construction--Plant System Integration

    International Nuclear Information System (INIS)

    Tada, E.; Matsuda, S.

    2009-01-01

    This brief paper introduces how the ITER will be built in the international collaboration. The ITER Organization plays a central role in constructing ITER and leading it into operation. Since most of the ITER components are to be provided in-kind from the member countries, integral project management should be scoped in advance of real work. Those include design, procurement, system assembly, testing, licensing and commissioning of ITER.

  5. SUBSURFACE CONSTRUCTION AND DEVELOPMENT ANALYSIS

    International Nuclear Information System (INIS)

    N.E. Kramer

    1998-01-01

    The purpose of this analysis is to identify appropriate construction methods and develop a feasible approach for construction and development of the repository subsurface facilities. The objective of this analysis is to support development of the subsurface repository layout for License Application (LA) design. The scope of the analysis for construction and development of the subsurface Repository facilities covers: (1) Excavation methods, including application of knowledge gained from construction of the Exploratory Studies Facility (ESF). (2) Muck removal from excavation headings to the surface. This task will examine ways of preventing interference with other subsurface construction activities. (3) The logistics and equipment for the construction and development rail haulage systems. (4) Impact of ground support installation on excavation and other construction activities. (5) Examination of how drift mapping will be accomplished. (6) Men and materials handling. (7) Installation and removal of construction utilities and ventilation systems. (8) Equipping and finishing of the emplacement drift mains and access ramps to fulfill waste emplacement operational needs. (9) Emplacement drift and access mains and ramps commissioning prior to handover for emplacement operations. (10) Examination of ways to structure the contracts for construction of the repository. (11) Discussion of different construction schemes and how to minimize the schedule risks implicit in those schemes. (12) Surface facilities needed for subsurface construction activities

  6. Oscillator construction of su(n|m) Q-operators

    Energy Technology Data Exchange (ETDEWEB)

    Frassek, Rouven, E-mail: rfrassek@physik.hu-berlin.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Max-Planck-Institut fuer Gravitationsphysik, Albert-Einstein-Institut, Am Muehlenberg 1, 14476 Potsdam (Germany); Lukowski, Tomasz, E-mail: lukowski@mathematik.hu-berlin.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Meneghelli, Carlo, E-mail: carlo@aei.mpg.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Max-Planck-Institut fuer Gravitationsphysik, Albert-Einstein-Institut, Am Muehlenberg 1, 14476 Potsdam (Germany); Staudacher, Matthias, E-mail: matthias@aei.mpg.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Max-Planck-Institut fuer Gravitationsphysik, Albert-Einstein-Institut, Am Muehlenberg 1, 14476 Potsdam (Germany)

    2011-09-01

    We generalize our recent explicit construction of the full hierarchy of Baxter Q-operators of compact spin chains with su(n) symmetry to the supersymmetric case su(n|m). The method is based on novel degenerate solutions of the graded Yang-Baxter equation, leading to an amalgam of bosonic and fermionic oscillator algebras. Our approach is fully algebraic, and leads to the exact solution of the associated compact spin chains while avoiding Bethe ansatz techniques. It furthermore elucidates the algebraic and combinatorial structures underlying the system of nested Bethe equations. Finally, our construction naturally reproduces the representation, due to Z. Tsuboi, of the hierarchy of Baxter Q-operators in terms of hypercubic Hasse diagrams.

  7. AN ACD DIAGRAM DEVELOPED FOR SIMULATING A BRIDGE CONSTRUCTION OPERATION

    Directory of Open Access Journals (Sweden)

    Fahimeh Zaeri

    2014-12-01

    Full Text Available Success in the performance of construction projects can be substantially enhanced if plans are formulated more realistically, ahead of time. Planning includes identifying project activities, required resources, interdependencies, and also recognizing the uncertainties in the duration of activities. Inherent features of construction projects, such as high repetition, complexity and uniqueness on the one hand, and advances in technology and methodologies on the other, create more difficulties in planning construction delivery. This is true for bridge operations. This study presents an innovative incremental beam launching method with twin truss gantry. This construction method has significant advantages in terms of cost and speed of performance, but increases the level of planning and management required for the bridge operation. Further, because of the newness of the method, no specific Work Breakdown Structure nor conceptual framework has been developed as yet. The aim of the current study is to explore the use of a simulation-based tool (EZStrobe to facilitate the planning and management of a bridge construction operation (case study. The process followed in the development of a conceptual framework for the case study project is described. An Activity Cycle Diagram is produced alongside the conceptual framework and process models, with the intent of illustrating the key steps in the simulation modelling method. The developed models could assist in scheduling and controlling inherent construction features such as uncertainties, complexities, and repetitions in bridge construction projects, consequently improving their delivery.

  8. Monitoring and evaluation of Blyth Offshore Wind Farm. Installation and commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Pepper, L.

    2001-07-01

    The principle aim of this report is to appraise the practical aspects of installation and commissioning of the offshore wind farm. The construction and installation activities of the project were monitored and reviewed by the project team to enable recommendations for future larger projects to be made. This report particularly looks at how the project progressed against the construction and installation schedule with regard to weather conditions and operational procedures. The document not only describes the methods of installation, assembly and cable laying, but also reviews the effectiveness of those methods including any difficulties that were encountered and the solutions that were found. (author)

  9. Recovery Act: Training Curriculum Development for Building Equipment Technicians, Operators, and Commissioning Agents/Auditors

    Energy Technology Data Exchange (ETDEWEB)

    Jacobsen, Joseph; Yu, David

    2012-08-04

    This US DOE funded project produced ten advanced energy engineering technology courses where students learn about the latest technologies and practices in the energy industry to reduce energy use in residential, commercial and industrial settings, accounting for over 50% of the world’s energy use. A geothermal and a solar thermal system were installed and commissioned as part of this project, an MATC’s cost share. An innovative intelligent lighting lab was installed, complete with course content as well as innovative academic pathway construction, laddering students from the 2-year technical college to the 4-year engineering school.

  10. Technical report on the design, construction, commissioning and operation of the super-FRS of FAIR

    International Nuclear Information System (INIS)

    Geissel, H.; Winkler, M.; Weick, H.

    2005-04-01

    In this report the construction of the super-FRS is described. Especially described are the ion-optical lay-out, the production targets, the magnets, the beam dumps, the degrader systems and the ion catcher, detectors and data-acquisition systems, as well as the safety aspects. (HSI)

  11. Commissioning and operation of the CEBAF end station refrigeration system

    International Nuclear Information System (INIS)

    Arenius, D.; Bevins, B.; Chronis, W.C.; Ganni, V.

    1996-01-01

    The CEBAF End Station Helium Refrigerator (ESR) System provides refrigeration at 80 K, 20 K and 4.5 K to three End Station experimental halls. The facility consists of a two stage helium screw compressor system, 4.5 K refrigerator, cryogen distribution valve box, and transfer lines to the individual experimental halls. The 4.5 K cold box and compressors were originally part of the ESCAR 1500 W, 4 K refrigeration system at Lawrence Berkeley Laboratory which was first commissioned in 1977. The compressors, 4.5 K cold box, and control system design were modified to adapt the plant for the requirements of the CEBAF experimental halls. Additional subsystems of cryogen distribution, transfer lines, warm gas management, and computer control interface were added. This paper describes the major plant subsystems, modifications, operational experiences and performance

  12. Jacques Delors - President de la Commission Europeenne

    Directory of Open Access Journals (Sweden)

    Dacian Graţian GAL

    2005-02-01

    Full Text Available This article refers to the President of the European Commission between 1985- 1995, Jacques Delors. He was the single person who exercised the presidency of the European Commission during 10 years and this period was one of the most important for the European construction: the achievement of the Single Market, the development of the Single Currency Unit project, of the new common politics, the enlargement of the European Union from 12 members to 15 members etc. Due the contribution of his presidency to the European construction, Jacques Delors is one of the parents of the European construction and one of the most important political men of the XX century.  

  13. Construction of adjoint operators for coupled equations depending on different variables

    International Nuclear Information System (INIS)

    Hoogenboom, J.E.

    1986-01-01

    A procedure is described for the construction of the adjoint operator matrix in case of coupled equations defining quantities that depend on different sets of variables. This case is not properly treated in the literature. From this procedure a simple rule can be deduced for the construction of such adjoint operator matrices

  14. Design, construction and commissioning of the new solid waste management and storage facilities of Ignalina NPP, Lithuania

    Energy Technology Data Exchange (ETDEWEB)

    Goehring, R.; Wenninger, K. [RWE NUKEM GmbH, Alzenau (Germany)

    2006-04-15

    The contract for the design, construction and commissioning (turn-key) of the New Solid Waste Management and Storage Facilities (SWMSF) has been awarded to RWE NUKEM GmbH. The contract was signed on the 30.11.2005. The New Solid Waste Management and Storage Facilities (SWMSF) are financed by the Ignalina Decommissioning Support Fund which is managed by European Bank for Reconstruction and Development (EBRD). The new facilities are required on the Ignalina Nuclear Power Plant (INPP) in order to support ongoing decomissioning work, including removal of waste from existing waste storage buildings. (orig.)

  15. AUTOCAD IN THE OPERATIONAL MANAGEMENT OF THE CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Tsareva Marina Vladimirovna

    2016-04-01

    Full Text Available Operational management of the construction is usually based on information analysis systems, which are aimed at the monitoring of working schedule and volumes as consistent with predicated schedules. The result of such systems’ operation is traditional information graphics (diagrams, charts, etc., which provides idea on the current state of the construction site and deviations from the planned settings. The author considers the visualization technology of construction of objects using an image of the situation on the AutoCAD drawings, converted into an interactive format. The article focuses on imperfections of the existing technologies of information support of the managers. The creation of unified IT platform is offered on the basis of CAD for creating an integrated information storage and visualization of the environment using electronic drawings and diagrams. Using interactive methods it is possible to illustrate the condition of almost any part of the construction project using these drawings and diagrams. E-drawings contain the basic information resources - estimates, plans, sections, specifications, technology, construction, etc. necessary for the calculation of indicators. The author proved that implementation of visualization is most efficient in case of electronic drawings in 3D format.

  16. Experience in construction and operation of HWR plants in Argentina

    International Nuclear Information System (INIS)

    Madero, C.C.; Cosentino, J.O.

    1982-01-01

    ''ATUCHA I'', the first nuclear power plant in Argentina, is in commerical operation since 1974 with a high capacity factor. The reactor is based on the MZFR prototype designed by SIEMENS with natural uranium and heavy water and PWR technic. The plant was built by SIEMENS on a turnkey contract and was rated 340 MWe. The offer presented in that opportunity by KWU was based on two reactors (ATUCHA I type) inside one single containment, due to the limitation in power of the reactor. Subsequent changes in the nature of the contract resulted in an active participation of CNEA engineering groups in the erection and commissioning of the reactor. In 1978 the national government approved a nuclear power plan to install four 600 MWe HWR plants until 1995. To start implementing this program, CNEA called for tenders for the supply of components and services for the ATUCHA II plant, in connection with the establishment of a local engineering company and the supply and construction of a heavy water production plant. In 1980 a contract was signed with KWU and the local company ENACE was formed to act as architect engineer and site coordinator. The plant will be located in the ATUCHA I site and the reactor will be similar but double in power to that one. Following the schedule of the nuclear plan, CNEA has just started preliminary studies for the next nuclear plant. ENACE will be responsible for the preparation of an offer for an ATUCHA reactor type. Local engineering and manufacturing firms, upon request and coordination from CNEA, and evaluating the local capacity to participate in the design and construction of a CANDU type nuclear plant. Final decision on this fourth nuclear plant in Argentina will be taken middle 1983. (J.P.N.)

  17. Chemistry control approach of pre commissioning and power operation of primary and auxiliary system of KGS-3 and 4 and trouble shooting made

    International Nuclear Information System (INIS)

    Bennet Raj, N.; Sahu, B.S.; Kumar, Vineet; Valluri, J.

    2008-01-01

    KGS (Kaiga Generating Station) 3 and 4 is a 220 MWe pressurized heavy water reactor (PHWR) using heavy water (D 2 O) as moderator and primary heat coolant and the secondary system is light water which is used to make the steam for generating the power. The chemistry control approach made for the successful commissioning and subsequent power operation of the unit is discussed here. The chemistry control is of two parts first part covers the pre commissioning chemistry control and the second part covers the commissioning chemistry control. During commissioning all systems were preserved by proper chemistry control and regular recirculation of system to avoid stagnancy. The major pre commissioning and commissioning chemistry control are depicted below: Pre commissioning chemistry control of primary heat transport (PHT) system and auxiliaries; Pre commissioning chemistry control of moderator system; Primary heat transport system hot conditioning with light water; Commissioning chemistry control of End Shield System (ESC) and Calandria Vault Cooling (CVC) system; Heavy water addition and its chemistry control in moderator system; and Heavy water addition and its chemistry control in PHT system. During power operation dew point in annular gas monitoring system (AGMS) of KGS unit 3 was maintaining in higher side under recirculation. The increase of dew point could be due to ingress of heavy water or light water. A new device was developed to collect condensate and the chemistry of the condensate was checked. The result indicated the ingress of light water. (author)

  18. Safe LHC beam commissioning

    International Nuclear Information System (INIS)

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  19. Report on the establishment and operation of the Federal Energy Regulatory Commission's Daycare Center

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-16

    We have completed an inspection of the Federal Energy Regulatory Commission's (FERC) Daycare Center (Center). The purpose of the inspection was to review for efficiency, economy and compliance with laws and regulations, FERC's establishment and operation of the Center. The inspection objectives were to review: (1) FERC's compliance with Federal laws and requirements of the General Services Administration and the District of Columbia; (2) the source and amount of funds for establishing and operating the Center; and (3) the organizational relationships between FERC, the Center and the contractor operating the Center.

  20. Fermionic construction of vertex operators for twisted affine algebras

    International Nuclear Information System (INIS)

    Frappat, L.; Sorba, P.; Sciarrino, A.

    1988-03-01

    We construct vertex operator representations of the twisted affine algebras in terms of fermionic (or parafermionic in some cases) elementary fields. The folding method applied to the extended Dynkin diagrams of the affine algebras allows us to determine explicitly these fermionic fields as vertex operators

  1. Dimensioning, construction and commissioning of a coffee beans drying system with use of solar collectors

    International Nuclear Information System (INIS)

    Mora Vindas, Allan Gerardo

    2014-01-01

    A system of low-cost solar drying of coffee beans is dimensioned, built and commissioned by using solar collectors based on recycled aluminum cans. The information is collected from literature about the drying of coffee, types of drying and the various types of solar dryers.The coffee beans drying system is conceptualized and sized based on a solar collector constructed of aluminum cans as solar radiation absorbing material. The grain drying system is then built in coffee benefit CoopeTarrazu to all provided by the company and help materials and labor facilities. A guide to implementation of solar drying technology with general information is tailored to implement, select, build and maintain a solar grain dryer in Central America. The launch of the drying system was made by checking the proper functioning of the system and measurement instruments variables selected to calculate the efficiency of the system. The drying system is tested with a load of 45 kg of coffee bean, using a flow of air through natural convection to operate the system with the exclusive use of renewable energy. The grain is drying from a humidity of 50% (b.n), up to a humidity between 11% and 13% (b.n), which is the range generally used for the safe storage of grain. Facts of solar radiation, temperature, air velocity, relative humidity and grain humidity were taken to determine the behavior of the sized system. The maximum thermal efficiency achieved by the solar collector is determined constructed of 18%, with an air flow of 0.013 kg/s and a solar radiation 1138 W/m 2 . The average drying efficiency during experimentation was 17.8%, which is among the range of efficiencies for the type of drying equipment. Best thermal efficiencies were obtained from the solar collector built that the commercial solar collector compared. Controlling the flow of air into the equipment is recommended in order to improve the thermal efficiency and drying equipment, using blowers, fans or induced draft chimney

  2. BIM-Integrated Construction Operation Simulation for Just-In-Time Production Management

    Directory of Open Access Journals (Sweden)

    WoonSeong Jeong

    2016-10-01

    Full Text Available Traditional construction planning, which depends on historical data and heuristic modification, prevents the integration of managerial details such as productivity dynamics. Specifically, the distance between planning and execution brings cost overruns and duration extensions. To minimize variations, this research presents a Building Information Modeling (BIM-integrated simulation framework for predicting productivity dynamics at the construction planning phase. To develop this framework, we examined critical factors affecting productivity at the operational level, and then forecast the productivity dynamics. The resulting plan includes specific commands for retrieving the required information from BIM and executing operation simulations. It consists of the following steps: (1 preparing a BIM model to produce input data; (2 composing a construction simulation at the operational level; and (3 obtaining productivity dynamics from the BIM-integrated simulation. To validate our framework, we applied it to a structural steel model; this was due to the significance of steel erections. By integrating BIM with construction operation simulations, we were able to create reliable construction plans that adapted to project changes. Our results show that the developed framework facilitates the reliable prediction of productivity dynamics, and can contribute to improved schedule reliability, optimized resource allocation, cost savings associated with buffers, and reduced material waste.

  3. Construction: first of St. Lucie unit 2 successes

    International Nuclear Information System (INIS)

    Conway, W.F.

    1989-01-01

    The Nuclear Regulatory Commission (NRC) granted a full power operating license for St. Lucie Unit 2 on June 10, 1983, just six years after construction began. The industry average for nuclear power plant construction during this time was approximately ten years. The rate of completion had a positive effect on the cost of the facility. The price of the unit was $1.42 billion as compared to the $2 billion to $5 billion range experienced by other utilities for nuclear plants. These accomplishments were not serendipitous but the results of management techniques and personnel attitudes involved in the construction of the unit. More importantly, many of these same techniques and attitudes have now become part of a quality improvement program at St Lucie and are reflected in its performance indicators. This paper analyzes the construction success of St Lucie Unit 2 and demonstrates that excellent performance in the construction phase can be carried over to the operation of a facility

  4. Molr - A delegation framework for accelerator commissioning

    CERN Document Server

    Valliappan, Nachiappan

    2017-01-01

    Accelerator commissioning is the process of preparing an accelerator for beam operations. A typical commissioning period at CERN involves running thousands of tests on many complex systems and machinery to ensure smooth beam operations and correct functioning of the machine protection systems. AccTesting is a software framework which helps orchestrate the commissioning of CERN’s accelerators and it’s equipment systems. This involves running and managing tests provided by various commissioning tools and analyzing their outcomes. Currently, AccTesting only supports a specific set of commissioning tools. In this project, we aim to widen the spectrum of commissioning tools supported by AccTesting by developing a generic and programmable integration framework called Molr, which would enable the integration of more commissioning tools with AccTesting. In this report, we summarize the work done during the summer student project and lay out a brief overview of the current status and next steps for Molr.

  5. 10 CFR 51.105 - Public hearings in proceedings for issuance of construction permits or early site permits...

    Science.gov (United States)

    2010-01-01

    ... Commission has previously prepared an environmental impact statement for the construction and operation of a... the limited work authorization, new and significant information on the environmental impacts of those... Utilization Facilities § 51.105 Public hearings in proceedings for issuance of construction permits or early...

  6. The Energy Regulatory Commission (1). Law of the Comision Reguladora de Energia

    International Nuclear Information System (INIS)

    1995-01-01

    The Energy Regulatory Commission. Reforms to the Electric Energy Public Service Law (1992) and the Regulatory Law of Article 27 on Petroleum (1995) have brought about fundamental changes in the electric and natural gas industries. The legal reforms explicitly permit the private sector to construct, operate, and own, systems of electric generation and natural gas transportation, storage and distribution. The participation of the private sector in these areas required a redefinition in the government regulatory institutions. Accordingly the Federal Congress enacted the law of the Comision Reguladora de Energia (CRE) in 1995. The CRE law expands the scope of the CRE's authority and the breadth of its powers beyond those established when it was initially created in 1993. The CRE commenced operations in January 1994 as a decentralized technical and consultative body of the Energy Ministry. The decree that created the Commission limited the scope of its authority to an analysis and consultative role applicable only to the electric industry. (Author)

  7. Night-time road construction operations synthesis of practice.

    Science.gov (United States)

    2008-05-01

    report synthesizes existing literature on nighttime construction operations, identifies gaps in the current state of knowledge, and summarizes research in progress studies that are planned or underway. The literature review and synthesis found the fo...

  8. Design, construction and commissioning of the Thermal Screen Control System for the CMS Tracker detector at CERN

    CERN Document Server

    Carrone, E; Tsirou, A

    The CERN (European Organization for Nuclear Research) laboratory is currently building the Large Hadron Collider (LHC). Four international collaborations have designed (and are now constructing) detectors able to exploit the physics potential of this collider. Among them is the Compact Muon Solenoid (CMS), a general purpose detector optimized for the search of Higgs boson and for physics beyond the Standard Model of fundamental interactions between elementary particles. This thesis presents, in particular, the design, construction, commissioning and test of the control system for a screen that provides a thermal separation between the Tracker and ECAL (Electromagnetic CALorimeter) detector of CMS (Compact Muon Solenoid experiment). Chapter 1 introduces the new challenges posed by these installations and deals, more in detail, with the Tracker detector of CMS. The size of current experiments for high energy physics is comparable to that of a small industrial plant: therefore, the techniques used for controls a...

  9. Design, construction and commissioning of SGPR, the fast protection system of RFX

    International Nuclear Information System (INIS)

    Collarin, P.; Trevisan, F.; Guarnieri, M.

    1994-01-01

    RFX, the largest machine for magnetic confinement of plasmas in the RFP line, is provided with a system named SGPR specifically designed for the machine global protection against fast faults which can develop in the plasma, in the windings, in the power supply circuits and in the control system. SGPR is a cabled logic HLL machine, able to organise in few tens of microseconds coordinated machine protection, dealing with more than forty fault signals and activating almost thirty protection commands. SGPR design, manufacture and test program conform the quality control criteria necessary to assure the required high reliability. After a careful and cumbersome commissioning work the system has assumed its protection role. Up to now it has been called to a number of interventions which, even if never due to major faults, have shown its capability of proper operation

  10. Design, construction and commissioning of SGPR, the fast protection system of RFX

    Energy Technology Data Exchange (ETDEWEB)

    Collarin, P.; Trevisan, F. [Instituto Gas Ionizzati del CNR, Padova (Italy); Guarnieri, M. [Universita di Padova (Italy)

    1994-11-01

    RFX, the largest machine for magnetic confinement of plasmas in the RFP line, is provided with a system named SGPR specifically designed for the machine global protection against fast faults which can develop in the plasma, in the windings, in the power supply circuits and in the control system. SGPR is a cabled logic HLL machine, able to organise in few tens of microseconds coordinated machine protection, dealing with more than forty fault signals and activating almost thirty protection commands. SGPR design, manufacture and test program conform the quality control criteria necessary to assure the required high reliability. After a careful and cumbersome commissioning work the system has assumed its protection role. Up to now it has been called to a number of interventions which, even if never due to major faults, have shown its capability of proper operation.

  11. PHWR safety: design, siting and construction

    International Nuclear Information System (INIS)

    Sharma, V.K.

    2002-01-01

    In all activities associated with NPPs viz. siting, design, construction, commissioning and operation, safety is given overriding importance. The safety design principles of PHWRs are based on defence-in-depth approach, physical and functional separation between process and safety systems and also among various safety systems, redundancy to meet single failure criteria and postulation of a number of design basis events for which the plant must be designed. Apart from engineered safety systems, PHWRs have inherent characteristics which contribute to safety. In siting of a NPP, it is required to ensure that the given site does not pose undue radiological hazard to public and the environment both during normal operation as well as during and following an accident condition. For this purpose, all site related external events, both natural and man induced, are assessed for their effect on the plant and are considered as part of the design basis. Possible radiological impact of the NPP on environment and surrounding population is assessed and ensured to be within acceptable limits. During construction phase, it is essential that the NPP be built in accordance with design intent and with required quality of workmanship to ensure that the NPP will remain safe during all states of operation. This is achieved through careful execution and QA activities encompassing all aspects of component fabrication at manufacturer works, civil construction, site erection, assembly, and commissioning. Future trends in nuclear safety will continue to be based on existing principles which have proved to be sound. These will be further strengthened by features such as increasing use of passive means of performing safety functions and a more explicit treatment of severe accidents. (author)

  12. Background submission to the Royal Commission on Nuclear Power Generation

    International Nuclear Information System (INIS)

    1976-12-01

    The Royal Commission on Nuclear Power Generation in New Zealand is required to inquire into and report upon the likely consequences of a nuclear power programme. The New Zealand Electricity Department would have prime responsibilty for implementing the construction, operation and maintenance of nuclear power plants should the need be established and should this be acceptable to the Government. In this submission the Department has attempted to present the issues raised by the introduction of nuclear power in relatively simple terms on the assumption that elaboration can be provided later if necessary

  13. The Industry Commission inquiry into charitable organisations.

    Science.gov (United States)

    Suter, K

    1996-01-01

    The Industry Commission has carried out Australia's largest inquiry into charities. It was, from the point of view of charities, an unsatisfactory operation, all the more so since it was not clear why the task had been given to the commission. This article examines the commission's work in three ways: the overall relationship between government and charities; the commission's proposed major reforms; and the minor reforms.

  14. The Australian SKA Pathfinder: operations management and user engagement

    Science.gov (United States)

    Harvey-Smith, Lisa

    2016-07-01

    This paper describes the science operations model for the Australian Square Kilometre Array Pathfinder (ASKAP) telescope. ASKAP is a radio interferometer currently being commissioned in Western Australia. It will be operated by a dedicated team of observatory staff with the support of telescope monitoring, control and scheduling software. These tools, as well as the proposal tools and data archive will enable the telescope to operate with little direct input from the astronomy user. The paper also discusses how close engagement with the telescope user community has been maintained throughout the ASKAP construction and commissioning phase, leading to positive outcomes including early input into the design of telescope systems and a vibrant early science program.

  15. Construction, testing, and initial operation of Fort St. Vrain PCRV

    International Nuclear Information System (INIS)

    Ople, F.S. Jr.; Neylan, A.J.

    1975-01-01

    The Fort St. Vrain (FSV) Nuclear Generating Station is the first station in the USA to use a prestressed concrete reactor vessel (PCRV). The PCRV was designed and constructed by General Atomic. Construction of the PCRV was completed in 1970; the pressure and leak tests were completed in 1971. The structural behavior of the PCRV has been monitored by installed instrumentation since start of construction. The highlights of the actual construction, testing, and initial operation of the PCRV, including a comparison of structural behavior, where possible, between observed data and analytical predictions. (U.S.)

  16. Pre-commissioning, commissioning, start-up and operation of a major extension to an LNG manufacturing facility in Bintulu, Sarawak

    International Nuclear Information System (INIS)

    Wong, T.

    1997-01-01

    In 1989, a decision was taken by the Shareholders of Malaysia LNG Sdn Bhd (MLNG) to expand their existing LNG manufacturing facility of some 8.0 million tonnes per annum, and to minimise the capital investment by maximizing the use of available off-plot facilities and utilities, together with the introduction of proven technological enhancements. Accordingly a new Company (MLNG Dua) was set up to own and manage this project and joint venture between existing shareholders. This paper describes the organisation, planning, and execution of the precommissioning, commissioning, start-up, and operation of the off-plot facilities, integrated utilities, and the first new process module, such that on-grade LNG rundown into MLNG's existing storage capacity was achieved within 26 days of the process module being signed off as Ready for Start-up (RFSU). (au)

  17. Automatic Analysis at the Commissioning of the LHC Superconducting Electrical Circuits

    CERN Document Server

    Reymond, H; Charrondiere, C; Rijllart, A; Zerlauth, M

    2011-01-01

    Since the beginning of 2010 the LHC has been operating in a routinely manner, starting with a commissioning phase and then an operation for physics phase. The commissioning of the superconducting electrical circuits requires rigorous test procedures before entering into operation. To maximize the beam operation time of the LHC, these tests should be done as fast as procedures allow. A full commissioning need 12000 tests and is required after circuits have been warmed above liquid nitrogen temperature. Below this temperature, after an end of year break of two months, commissioning needs about 6000 tests. As the manual analysis of the tests takes a major part of the commissioning time, we automated existing analysis tools. We present here how these LabVIEW™ applications were automated, the evaluation of the gain in commissioning time and reduction of experts on night shift observed during the LHC hardware commissioning campaign of 2011 compared to 2010. We end with an outlook at what can be further optimized.

  18. Automatic analysis at the commissioning of the LHC superconducting electrical circuits

    International Nuclear Information System (INIS)

    Reymond, H.; Andreassen, O.O.; Charrondiere, C.; Rijllart, A.; Zerlauth, M.

    2012-01-01

    Since the beginning of 2010 the LHC has been operating in a routinely manner, starting with a commissioning phase and then an operation for physics phase. The commissioning of the superconducting electrical circuits requires rigorous test procedures before entering into operation. To maximize the beam operation time of the LHC, these tests should be done as fast as procedures allow. A full commissioning need 12000 tests and is required after circuits have been warmed above liquid nitrogen temperature. Below this temperature, after an end of year break of two months, commissioning needs about 6000 tests. As the manual analysis of the tests takes a major part of the commissioning time, we automated existing analysis tools. We present here how these LabVIEW TM applications were automated, the evaluation of the gain in commissioning time and reduction of experts on night shift observed during the LHC hardware commissioning campaign of 2011 compared to 2010. We end with an outlook at what can be further optimized. (authors)

  19. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  20. A Practical Guide for Commissioning Existing Buildings

    Energy Technology Data Exchange (ETDEWEB)

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  1. Protocol to the 1994 Co-operation Agreement between The Government of the Islamic Republic of Pakistan and CERN concerning a Special Contribution by Pakistan towards the Construction of the LHC

    CERN Document Server

    2003-01-01

    CERN signed a Co-operation Agreement with the Government of Pakistan in 1994, which was followed in 1997 by a Protocol signed with the Pakistan Atomic Energy Commission (PAEC) concerning CMS magnet supports. CERN and PAEC then signed in 1998 a Memorandum of Understanding for collaboration in the construction of the CMS detector. The participation by Pakistani scientists and engineers in the CERN programme is channelled through the National Centre of Physics (NCP) established at the Quaid-i-Azzam University in Islamabad, under the terms of a 1999 Protocol to the 1994 Co-operation Agreement. The engineering and detector construction work performed under these Agreements has been of high quality, and the Pakistani participation is valued highly by the CMS collaboration. In continuation of this co-operation, Pakistan, represented by PAEC as funding agency, has now proposed to make in-kind contributions to the LHC Project of a value of up to ten million US dollars. Under the proposed scheme, CERN shall pay 50% of ...

  2. Protocol to the 1994 Co-operation Agreement between The Government of the Islamic Republic of Pakistan and CERN concerning a Special Contribution by Pakistan towards the Construction of the LHC

    CERN Document Server

    2003-01-01

    CERN signed a Co-operation Agreement with the Government of Pakistan in 1994, which was followed in 1997 by a Protocol signed with the Pakistan Atomic Energy Commission (PAEC) concerning CMS magnet supports. CERN and PAEC then signed in 1998 a Memorandum of Understanding for collaboration in the construction of the CMS detector. The participation by Pakistani scientists and engineers in the CERN programme is channelled through the National Centre of Physics (NCP) established at the Quaid-i-Azzam University in Islamabad, under the terms of a 1999 Protocol to the 1994 Co-operation Agreement. The engineering and detector construction work performed under these Agreements has been of high quality, and the Pakistani participation is valued highly by the CMS collaboration. In continuation of this co-operation, Pakistan, represented by PAEC as funding agency, has now proposed to make in-kind contributions to the LHC Project, such as mechanical components and assembly work, with a value of up to ten million US dollar...

  3. Commissioning of ATLAS

    CERN Document Server

    Thomas, J

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focussing on combined running and track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  4. A selective study of Information technologies to improve operations efficiency in construction

    Directory of Open Access Journals (Sweden)

    Konikov Alexandr

    2018-01-01

    Full Text Available Today, information technologies (IT are used in almost every production industry. While the aspects of IT are well studied and discussed in relevant monographs, articles, web sources, etc., this paper reviews the performance improvement options in the construction industry by leveraging IT. From a wide range of information technologies the author has picked the most relevant solutions, from his point of view, based on several considerations, the most important one being the lack of adequate attention to these technologies specifically in the construction industry. The paper covers the following technologies: Big Data (a smart technology for high-speed processing of huge and diverse data arrays; situation centers (SC for construction and operations projects (SCs are successfully used in other industries for operating control of sophisticated facilities; data warehouses (DW for the construction industry (DWs are viewed as a standalone project rather than a supplement to Data Mining or Big Data; operational and dispatch radio communication service (radio communication can ensure instant connectivity between several subscribers; VSAT (a satellite technology for prompt connection of a distant construction site with the 'outer world' when no alternatives are available. The paper briefly presents the essence of each technology, describes the pre-requisites for its use in construction, outlines the key advantages, limits and shortcomings, and lists construction projects where it shall be worthwhile to use a specific technology projects.

  5. Commissioning of an Integral Effect Test Loop for SMART

    Energy Technology Data Exchange (ETDEWEB)

    Park, Hyunsik; Bae, Hwang; Kim, Dongeok; Min, Kyoungho; Shin, Yongcheol; Ko, Yungjoo; Yi, Sungjae [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2013-05-15

    An integral-effect test loop for SMART, SMART-ITL (or FESTA), has been constructed at KAERI. Its height was preserved and its flow area and volume were scaled down to 1/49 compared with the prototype plant, SMART. The ratio of the hydraulic diameter is 1/7. The SMART is a 330 MW thermal power reactor, and its core exit temperature and PZR pressure are 323 .deg. C and 15 MPa during a normal working condition, respectively. The maximum power of the core heater in the SMART-ITL is 30% of the scaled full power. As shown in Fig. 1, the SMART-ITL consists of a primary system including a reactor pressure vessel with a pressurizer, four steam generators and four main coolant pumps, a secondary system, a safety system, and an auxiliary system. The SMART-ITL facility will be used to investigate the integral performance of the inter-connected components and possible thermal-hydraulic phenomena occurring in the SMART design, to validate its safety for various design basis events and broad transient scenarios, and to validate the related thermal-hydraulic models of the safety analysis codes. The scenarios include small-break loss-of coolant accident (SBLOCA) scenarios, complete loss of RCS flowrate (CLOF), steam generator tube rupture (SGTR), feedwater line break (FLB), and main steam line break (MSLB). The role of SMART-ITL will be extended to examine and verify the normal, abnormal, and emergency operating procedures required during the construction and export phases of SMART. After an extensive series of commissioning tests in 2012, the SMART-ITL facility is now in operation. In this paper, the major test results acquired during the commissioning tests will be discussed.

  6. Research Trends on Benefits of Implementing Constructability, Operability, and Maintainability

    Directory of Open Access Journals (Sweden)

    Kordestani Ghaleenoe, N.

    2017-07-01

    Full Text Available Despite allocating huge budgets to civil engineering projects, detailed planning, and employing human resources, project managers still face time, cost, and quality constraints. Most of these challenges are due to a lack of integration of different project phases and the limitations of the presence of construction and maintenance contractors in the initial stages of the project. Considering the benefits of applying constructability, operability, and maintainability (COM concepts, many problems caused by lack of coordination, or duplications and weakness in management, and also time and extra costs due to lack of presence of construction and maintenance contractors in the early stages of the project are resolvable. In this regard, various studies have investigated the benefits of applying these concepts; however, there has been no comprehensive analysis of the benefits of COM. As a result of focus on the benefits of implementation of these concepts and evaluating the effect of each of these strategies and benefits, from different perspectives during various time periods, managers can increase project efficiency and productivity, and improve their performance, through using concepts and strategies of their implementation. This research aims to evaluate the trend of studies on the benefits of implementing constructability, operability, and maintainability in the construction industry. For that, the in-depth literature review method is applied. For qualitative analysis of the obtained information, descriptive analysis has been used. Then, the data was coded, and classified using Excel Software for quantitative data analysis. Finally, the charts presented were evaluated according to the classified fields of study. The necessity of performing such a study is significant because of the fact that a large share of a project’s problems, such as lack of plans’ integration and weakness of administrative system, and increasing time and cost, are due to

  7. Report to the US Nuclear Regulatory Commission on Analysis and Evaluation of Operational Data, 1986

    International Nuclear Information System (INIS)

    1987-05-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during calendar year 1986. Comments and observations are provided on operating experience at nuclear power plants and other NRC licensees, including results from selected AEOD studies; summaries of abnormal occurrences involving US nuclear plants; reviews of licensee event reports and their quality, reactor scram experience from 1984 to 1986, engineered safety features actuations, and the trends and patterns analysis program; and assessments of nonreactor and medical misadministration events. In addition, the report provides the year-end status of all recommendations included in AEOD studies, and listings of all AEOD reports issued from 1980 through 1986

  8. Final environmental statement related to the operation of Comanche Peak Steam Electric Station, Units 1 and 2: (Docket Nos. 50-445 and 50-446)

    International Nuclear Information System (INIS)

    1981-09-01

    The proposed action is the issuance of operating licenses to the Texas Utilities Generating Company for the startup and operation of Units 1 and 2 of the Comanche Peak Steam Electric Station located on Squaw Creek Reservoir in Somervell County, Texas, about 7 km north-northeast of Glen Rose, Texas, and about 65 km southwest of Fort Worth in north-central Texas. The information in this environmental statement represents the second assessment of the environmental impact associated with the Comanche Peak Steam Electric Station pursuant to the guidelines of the National Environmental Policy Act of 1969 (NEPA) and 10 CFR Part 51 of the Commission's Regulations. After receiving an application to construct this station, the staff carried out a review of impact that would occur during its construction and operation. This evaluation was issued as a Final Environmental Statement -- Construction Phase. After this environmental review, a safety review, an evaluation by the Advisory Committee on Reactor Safeguards, and public hearings in Glen Rose, Texas, the US Atomic Energy Commission (now US Nuclear Regulatory Commission) issued construction permits for the construction of Units 1 and 2 of the Comanche Peak Steam Electric Station. 16 figs., 34 tabs

  9. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    Science.gov (United States)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  10. Neutron production and dose rate in the IFMIF/EVEDA LIPAc injector beam commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Kondo, Keitaro, E-mail: kondo.keitaro@jaea.go.jp [Rokkasho Fusion Institute, Japan Atomic Energy Agency, Rokkasho-mura, Kamikita-gun, Aomori (Japan); Narita, Takahiro; Usami, Hiroki; Takahashi, Hiroki; Ochiai, Kentaro; Shinto, Katsuhiro; Kasugai, Atsushi [Rokkasho Fusion Institute, Japan Atomic Energy Agency, Rokkasho-mura, Kamikita-gun, Aomori (Japan); Okumura, Yoshikazu [IFMIF/EVEDA Project Team, Rokkasho-mura, Kamikita-gun, Aomori (Japan)

    2016-11-01

    Highlights: • A dedicated neutron production yield monitoring system for LIPAc has been developed. • The biological dose rate during operation of the LIPAc injector was analyzed. • The neutron streaming effect due to penetrations in the shielding wall was investigated. - Abstract: The construction of the Linear IFMIF Prototype Accelerator (LIPAc) is in progress in Rokkasho, Japan, and the deuteron beam commissioning of the injector began in July 2015. Due to the huge beam current of 125 mA, a large amount of d-D neutrons are produced in the commissioning. The neutron streaming effect through pipe penetrations and underground pits may dominate the radiation dose at the outside of the accelerator vault during the injector operation. In the present study the effective dose rate expected during the injector commissioning was analyzed by a Monte Carlo calculation and compared with the measured value. For the comparison it is necessary to know the total neutron production yield in the accelerator vault, thus a dedicated neutron production yield monitoring system was developed. The yield obtained was smaller than that previously reported in a literature by a factor of a few and seems to depend on some beam conditions. From the comparison it was proved that the calculation always provides a conservative estimate and the dose rates in places where occupational works can always access and the controlled area boundary are expected to be far less than the legal criteria throughout the injector commissioning.

  11. Regulatory aspects of construction and operation in Switzerland

    International Nuclear Information System (INIS)

    Hugi, Markus

    2014-01-01

    The regulatory mission with respect to radioactive waste disposal in Switzerland consists of the following tasks: to assess proposed solutions and supervise the preparation for geological disposal of radioactive waste, to review the licence applications in accord with the stepwise implementation process; to supervise the transport of radioactive material to and from nuclear installations; to supervise surface facilities and underground installations of deep geological repositories; and to supervise the safety of staff and the public and their protection from radiation. Related nuclear legislation consists of the Nuclear Energy Act, the Radiological Protection Act including the corresponding Ordinances, and the Ordinance on the Decommissioning Fund and the Waste Disposal Fund for Nuclear Installations. Design, construction and operating principles for DGRs and requirements for the safety case have been developed recently by the Swiss regulatory body. The corresponding guideline specifies protection objectives, protection criteria and specific requirements for DGRs, defines the procedure to be followed for demonstrating the safety of a geological repository, and identifies requirements for the operation of facilities and for their closure. The Nuclear Energy Act stipulates a series of licences that must be obtained prior to completion of a DGR - starting with a general licence, followed by the licences for construction and operation, and finally the closure order

  12. Commissioning and operation of the nuclear physics injector at SLAC

    International Nuclear Information System (INIS)

    Koontz, R.F.; Iverson, R.; Leyer, G.K.; Miller, R.H.

    1985-01-01

    The new Nuclear Physics Injector (NPI) approved for construction in October of 1983 was completed by September of 1984, and delivered short pulse beams for SPEAR ring checkout in mid-October. Long pulse beams of up to 1.6 microsecond length were also demonstrated. The paper describes the startup operation, reviews the performance characteristics, and discusses the beam transport optics used to deliver 1 to 4 GeV beams to nuclear physics experiments in End Station A. The SLAC Nuclear Physics Injector is in full operationexclamation

  13. AP1000 construction and operating costs

    International Nuclear Information System (INIS)

    Winters, J.W.; Corletti, M.M.; Thompson, M.

    2001-01-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  14. AP1000 construction and operating costs

    Energy Technology Data Exchange (ETDEWEB)

    Winters, J.W.; Corletti, M.M. [Westinghouse Electric Corp., Pittsburgh, PA (United States); Thompson, M

    2001-07-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  15. Commissioning of the nuclear power plant

    International Nuclear Information System (INIS)

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  16. Using game technologies to improve the safety of construction plant operations.

    Science.gov (United States)

    Guo, Hongling; Li, Heng; Chan, Greg; Skitmore, Martin

    2012-09-01

    Many accidents occur world-wide in the use of construction plant and equipment, and safety training is considered by many to be one of the best approaches to their prevention. However, current safety training methods/tools are unable to provide trainees with the hands-on practice needed. Game technology-based safety training platforms have the potential to overcome this problem in a virtual environment. One such platform is described in this paper - its characteristics are analysed and its possible contribution to safety training identified. This is developed and tested by means of a case study involving three major pieces of construction plant, which successfully demonstrates that the platform can improve the process and performance of the safety training involved in their operation. This research not only presents a new and useful solution to the safety training of construction operations, but illustrates the potential use of advanced technologies in solving construction industry problems in general. Copyright © 2011 Elsevier Ltd. All rights reserved.

  17. Optimization of the commissioning period of nuclear power plant

    International Nuclear Information System (INIS)

    Hou Ganglian; Li Chunyue

    2014-01-01

    Due to current equipment manufacture capacity, construction experience and other factors, commissioning of nuclear power projects was used to be postponed, which could lead to delay of the whole project. Based on the actual situation, optimization of commissioning period and its logic could be an effective way to improve this situation to some extent. Based on previous practice and experience in the schedule management for the commissioning nuclear power projects, this paper analyzes and discusses the characteristics of make commissioning plan and the difficulties of program implementation and strategies of commissioning plan optimization, discusses and presents ways of dynamic plan adjustment and optimization at the vision of entire project, synthesizes the methods of time management through commissioning itself, interface and management, expounds measures for the timing and optimization of commissioning schedule and commissioning period, and sums up the ways of optimization of commissioning period, improving management capabilities and control of optimization principles. (authors)

  18. Construction and testing of JT-60

    International Nuclear Information System (INIS)

    Kishimoto, H.; Aikawa, H.; Oikawa, A.; Miya, N.; Suzuki, K.; Ozeki, T.; Tokutake, T.; Kunieda, S.; Hiruta, K.; Hosoda, R.

    1987-01-01

    The JT-60 project is reviewed in terms of design, R and D, construction, commissioning and project management. Design features of JT-60 have been refined and renewed through periodic assessments. Engineering targets have been achieved by R and D efforts. Construction and commissioning have progressed on schedule with intensive project management and control. JT-60 obtained high performance and has entered into the experimental phase after completion of machine construction. (orig.)

  19. Law no. 10.308 of 20th November, 2001 on radioactive waste repositories siting, construction, licensing, operation, inspection, costs, indemnity, civil liability and guarantees concerning to the radioactive wastes repositories and other provisions

    International Nuclear Information System (INIS)

    2001-01-01

    This Act was published on November 20, 2001 and set forth regulations on the final disposal of radioactive wastes produced in Brazil, including siting, construction, licensing, operation, inspection, costs, indemnities, civil liability and guarantees concerning to the radioactive wastes repositories. This act allows for installation and operation of initial, intermediary and final repositories in accordance with the criteria established by the Brazilian Nuclear Energy National Commission - CNEN. The person or organization granted with CNEN authorization for operation of the initial repositories shall be liable for personal, patrimony and environmental radiological damages. The civil liability of CNEN is concerned to the radioactive waste intermediary and final disposals and transportation

  20. Commissioning and operating experience with the LISA superconducting accelerator

    International Nuclear Information System (INIS)

    Castellano, M.; Ferrario, M.; Minestrini, M.; Patteri, P.; Tazzioli, F.; Kulinski, S.

    1996-06-01

    The commissioning of the LISA superconducting (SC) RF electron linac at INFN Frascati Laboratories has been concluded although, due to a change in program priorities, the full possibilities of the machine have not been exploited. In this report the authors illustrate the results achieved so far and the difficulties encountered in commissioning, with the hope that this material might be some of help to those who intend to start the enterprise of building a SC linac in a non specialized environment. The part concerning the SC system is particularly stressed, but a relevant attention is also devoted to the traditional room temperature injector, the proper setting of which is fundamental to achieving the high beam quality that such a machine allows

  1. Determination of total flow rate and flow rate of every operating branch in commissioning of heavy water loop for ARR-2

    International Nuclear Information System (INIS)

    Han Yan

    1997-01-01

    The heavy water loop (i,e, RCS) for ARR-2 in Algeria is a complex loop. Flow regulating means are not provided by the design in order to operate the reactor safely and simplify operating processes. How to determine precisely the orifice diameters of resistance parts for the loop is a key point for decreasing deviation between practical and design flow rates. Commissioning tests shall ensure that under every one of combined operating modes for the pumps, total coolant flow rate is about the same (the number of pumps operating in parallel is the same) and is consistent with design requirement, as well as the distribution of coolant flow rate to every branch is uniform. The flow Determination is divided into two steps. First and foremost, corresponding resistance part at each pump outlet is determined in commissioning test of shorted heavy water loop with light water, so that the problem about uniform distribution of the flow rate to each branch is solved, Secondly, resistance part at the reactor inlet is determined in commissioning test of heavy water loop connected with the vessel, so that the problem about that total heavy water flow rate is within optimal range is solved. According to practical requirements of the project, a computer program of hydraulic calculation and analysis for heavy water loop has been developed, and hydraulic characteristics test for a part of loop has been conducted in order to correct calculation error. By means of program calculation combining with tests in site, orifice diameters of 9 resistance parts has been determined rapidly and precisely and requirements of design and operation has been met adequately

  2. Corrosion inhibition measures in primary cooling water system during refurbishment of Cirus, re-commissioning and subsequent operation

    International Nuclear Information System (INIS)

    Rai, K.K.; Ramesh, N.; Sharma, R.C.

    2008-01-01

    Cirus is a 40 MWth, heavy water moderated, demineralized light water cooled, natural uranium fuelled research reactor. Reactor was commissioned in year 1960 and operated satisfactorily till 1990. After that availability factor started decreasing mainly due to equipment outage exhibiting signs of ageing. Based upon systematic ageing studies and assessment of condition of systems, structures and components, a refurbishment plan including safety upgrades was drawn up. Reactor was shut down in October 1997 for execution of jobs. After completion of refurbishment jobs reactor was started back in October 2002 and power operation was achieved in 2003. Primary cooling water (PCW) system consists of re-circulating pumps, heat exchangers, expansion tank, piping, valves, emergency storage reservoir (Ball Tank) and other components. Normally the fission heat from fuel is removed by re-circulating coolant in closed loop and transferred to seawater via heat exchangers. In case of outage of pumps, shut down cooling is provided by flow of water from Ball Tank under gravity to the underground dump tanks. The dissolved oxygen is maintained below 2 ppm and pH is maintained neutral to minimize corrosion of fuel cladding (Aluminum). This paper highlights the experience gained during segmentation of primary cooling water pipelines for pressure testing, measures taken to corrosion inhibition of primary cooling water lines to permit execution of refurbishment jobs, inspections and actions taken to repair/replace the corroded PCW pipe line segments, observations regarding corrosion related failures, re-commissioning of the system after refurbishment, assessment for safe reactor operation and experience during power operation. (author)

  3. Recent results of PADReS, the Photon Analysis Delivery and REduction System, from the FERMI FEL commissioning and user operations.

    Science.gov (United States)

    Zangrando, Marco; Cocco, Daniele; Fava, Claudio; Gerusina, Simone; Gobessi, Riccardo; Mahne, Nicola; Mazzucco, Eric; Raimondi, Lorenzo; Rumiz, Luca; Svetina, Cristian

    2015-05-01

    The Photon Analysis Delivery and REduction System of FERMI (PADReS) has been routinely used during the machine commissioning and operations of FERMI since 2011. It has also served the needs of several user runs at the facility from late 2012. The system is endowed with online and shot-to-shot diagnostics giving information about intensity, spatial-angular distribution, spectral content, as well as other diagnostics to determine coherence, pulse length etc. Moreover, PADReS is capable of manipulating the beam in terms of intensity and optical parameters. Regarding the optics, besides a standard refocusing system based on an ellipsoidal mirror, the Kirkpatrick-Baez active optics systems are key elements and have been used intensively to meet users' requirements. A general description of the system is given, together with some selected results from the commissioning/operations/user beam time.

  4. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    The major progress made during the last months has been in the consolidation of services for the +endcaps and three barrel wheels (YB+2, YB+1 and YB0): all subdetectors have now final power connections (including Detector Safety protection), the gas systems have been commissioned for all gas detectors (the recirculation is not yet activated for the RPC though) and detector cooling has also been commissioned. Their integration with final services is the necessary condition for being able to operate larger fractions the detector. Recent weeks have seen full HCAL, more than 50% of EB and full wheels of DTs and CSC being operated using final services. This has not yet translated into major progress of global integration due to major interruptions of central services, which have not allowed the necessary debugging and commissioning time to all the subdetec¬tors and central activities like DAQ and trigger. Moreover the running in of the final central services has introduced instabilities related to the co...

  5. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    CERN Document Server

    T. Camporesi

    P5 Commissioning activities The commissioning effort at the pit has made major progress since the last CMS week concerning the installation and operation of the off-detector electronics in USC. The progress has been much slower in the experi¬mental cavern due to the delay in the deployment of the infrastructure which should eventually allow safe powering-up of the front ends. Nevertheless, temporary power connections have allowed operation of slices of subdetectors at any given time. HF, HE, ECAL, DTs, RPCs and CSCs have carried out local commissioning tests with these temporary services. The status of hardware deployment in USC and on the towers/balconies is represented in the detailed table below.   Table 1: Status of installation of off-detector electronics. FEDs are detector dependent hardware modules which perform the first ‘colla¬tion’ of front-end data and send it to Central-data for event building. Tracker, ECAL, HCAL have their front end electronics mo...

  6. Biogas plants: Design, construction and operation

    International Nuclear Information System (INIS)

    2001-01-01

    At the big readiness of waste coming from the agricultural activities are looked for the production of Energy and Payments, the biogas like product of the organic decomposition under anaerobic conditions, their composition and characteristic. The elements that conform the design as the digester, the storage, the load tanks and it discharges and the conduction is described and analyzed. They are given a series of elements to obtain the characteristics of the system possible to place as: planning, calculations, evaluation, execution and operation. Lastly the steps are indicated that should be continued in the construction of the plant including planning for the work

  7. The construction and commissioning of MINT's latex irradiator

    International Nuclear Information System (INIS)

    Razali Hamzah; Muhd Khairi Muhd Said; Muhd Ariff Hamzah; Wan Manshol Wan Zin; Taiman Kadni

    1996-01-01

    The construction and installation of MINT's automatic continuous latex irradiator is described. MINT cooperated with NUKEM to design the plant. Construction was done by local building consultants and local contractor. The installation of the plant includes local fabrication components and imported components. The plant is automatically controlled by a computer system. Features of plant is described

  8. Commissioning and operation of 130 kV/130 A switched-mode HV power supplies with the upgraded JET neutral beam injectors

    International Nuclear Information System (INIS)

    Edwards, D.C.; Bigi, M.; Brown, D.P.D.; Ganuza, D.; Garcia, F.; Hudson, Z.; Jones, T.T.C.; Perez, A.

    2005-01-01

    The design features, on-site testing, commissioning and operation are described of two new 130 kV/130 A HV power supply units serving four upgraded 130 kV/60 A positive ion neutral injectors (PINIs) on JET. Both units were factory tested at full power and pulse length into dummy resistive load. Following on-site installation, the factory tests were repeated. The transition from dummy-load testing to PINI operation required full integration of the HVPS within the overall JET control system, and rigorous testing of the co-ordinated actions and protections of all PINI power supplies (filament and arc for plasma source and negative suppression grid). The implementation of these functions is described. Extensive use was made of parasitic integrated test pulses, where the other PINIs could be operated normally, with the HVPS energised under full remote control together with the corresponding PINI plasma sources, but with the HVPS connected to dummy load. The amount of NB operation time dedicated to commissioning was thereby minimised, yet gave a high degree of confidence of readiness for HV energisation of the PINI, and first beam operation followed less than 24 h from HV connection to the PINI. The routine operating experience and performance, including load protection characteristics of the new HVPS units are also described

  9. Construction and early commissioning results of the AGS Booster

    International Nuclear Information System (INIS)

    Weng, W.T.; Ahrens, L.; Damm, R.; McNerney, A.J.

    1991-01-01

    The AGS Booster synchrotron has been designed to accelerate protons from 200 MeV to 1.5 GeV and heavy ions from several MeV per nucleon to several hundred MeV per nucleon for all the nuclei up to gold. The design requirements and measurements results of major accelerator components and systems are presented. The early commissioning results of the injection is also presented. 12 refs., 9 figs., 2 tabs

  10. Nuclear safety requirements for operation licensing of Egyptian research reactors

    International Nuclear Information System (INIS)

    Ahmed, E.E.M.; Rahman, F.A.

    2000-01-01

    From the view of responsibility for health and nuclear safety, this work creates a framework for the application of nuclear regulatory rules to ensure safe operation for the sake of obtaining or maintaining operation licensing for nuclear research reactors. It has been performed according to the recommendations of the IAEA for research reactor safety regulations which clearly states that the scope of the application should include all research reactors being designed, constructed, commissioned, operated, modified or decommissioned. From that concept, the present work establishes a model structure and a computer logic program for a regulatory licensing system (RLS code). It applies both the regulatory inspection and enforcement regulatory rules on the different licensing process stages. The present established RLS code is then applied to the Egyptian Research Reactors, namely; the first ET-RR-1, which was constructed and still operating since 1961, and the second MPR research reactor (ET-RR-2) which is now in the preliminary operation stage. The results showed that for the ET-RR-1 reactor, all operational activities, including maintenance, in-service inspection, renewal, modification and experiments should meet the appropriate regulatory compliance action program. Also, the results showed that for the new MPR research reactor (ET-RR-2), all commissioning and operational stages should also meet the regulatory inspection and enforcement action program of the operational licensing safety requirements. (author)

  11. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  12. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  13. Commissioning quality assurance at Pickering NGS

    International Nuclear Information System (INIS)

    Wieckowski, J.T.

    1983-05-01

    Ontario Hydro decided in 1978 to implement a formal quality assurance program applicable to commissioning and operation of nuclear generating stations. Pickering NGS is the first station to have the commissioning quality assurance (CQA) program applied to it. This paper outlines the scope, implementation, and evaluation of the CQA program as applied to Pickering Unit 5

  14. Design, construction and commissioning of an interim spent fuel store for the decommissioning of Ignalina NPP, Lithuania

    International Nuclear Information System (INIS)

    Rainer Goehring; Martin Beverungen; Phil Smith

    2006-01-01

    The contract for the design, construction and commissioning (turn-key) of an interim spent fuel store facility (ISFSF) has been awarded to a Consortium of GNS Gesellschaft fuer Nuklear Service and RWE NUKEM GmbH under the lead of RWE NUKEM. The contract was signed on the 12.01.2005. The Interim Spent Fuel Storage Facility (ISFSF) is financed by the Ignalina Decommissioning Support Fund which is managed by EBRD. All spent fuel assemblies, currently stored in the spent fuel pits at the reactors plus future arising (about 18000 in total) will be loaded in the CONSTOR R RBMK1500/M2 containers, which are stored in the new facility. The initial contract has been awarded for 3500 spent fuel assemblies. (authors)

  15. Commissioning of the TRIUMF ISAC RF system

    International Nuclear Information System (INIS)

    Fong, K.; Fang, S.; Laverty, M.; Lu, J.; Poirier, R.L.

    2001-09-01

    The ISAC RF system at present consists of a Radio Frequency Quadrupole accelerator, five Drift Tube Linear Accelerators, six bunchers, two choppers and a bunch rotator. The RFQ operates at the fundamental frequency of 35.36 MHz, while the DTLs operate at the third harmonic frequency of 106.08 MHz. The operating power ranges from 45 W to 120 W for the choppers, 1 kW to 20 kW for the DTLs and bunchers, and 80 kW for the RFQ. These cavities have been commissioned to operate synchronously with both closed-loop amplitude and phase regulation, as well as automatic tuning of the cavities. This paper gives a brief summary of the commissioning experience. (author)

  16. Indexes to Nuclear Regulatory Commission Issuances, January-March 1981

    International Nuclear Information System (INIS)

    1981-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors Denials (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility), Full text reference (volume and pagination), Issuance number, Issues raised by appellants, Legal citations (cases, regulations, and statutes), Name of facility, Docket number, Subject matter of issues and/or rulings, Type of hearing (for construction permit, operating license, etc.), and Type of issuance

  17. Report to the US Nuclear Regulatory Commission on Analysis and Evaluation of Operational Data, 1987: Nonreactors

    International Nuclear Information System (INIS)

    1988-10-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1987. The report is published in two volumes. NUREG-1272, Vol. 2, No. 1, covers Power Reactors and presents an overview of the operating experience of the nuclear power industry, with comments regarding the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from Licensee Event Reports, the NRC's Operations Center, and Diagnostic Evaluations. NUREG-1272, Vol. 2, No. 2, covers Nonreactors and presents a review of the nonreactor events and misadministration reports that were reported in 1987 and a brief synopsis of AEOD studies published in 1987. Each volume contains a list of the AEOD reports issued for 1980-1987

  18. The Hydraulic Project Włocławek: Design, Studies, Construction and Operation

    Directory of Open Access Journals (Sweden)

    Wojciech Majewski

    2015-03-01

    Full Text Available The Hydraulic Project Włocławek was commissioned in 1970 as the first barrage of the Lower Vistula Cascade (LVC. The purpose of the LVC was to create an important source of hydro-energy and inland navigation route connecting central Poland with the port city of Gdańsk. Along the Lower Vistula (LV important cities and industrial centres are located. The Włocławek project still remains the only barrage on the LV thus creating a number of problems. The paper presents the basic hydrological and hydraulic data for the Vistula river, and describes the Włocławek project, hydraulic model investigations conducted in the design phase, the construction of the project and the main problems, attendant on its use, including the winter flood of 1982 in the upper part of the Włocławek reservoir. The paper ends with conclusions on project construction and exploitation. The next barrage downstream from Włocławek is proposed.

  19. International Commission on Radiological Protection. History, policies, procedures

    International Nuclear Information System (INIS)

    Lindell, Bo; Dunster, H.J.; Valentin, Jack; )

    2000-01-01

    This report briefly reviews the history, mode of operation, concepts, and current policies of the International Commission on Radiological Protection (ICRP). It touches upon the objectives of the Commission's recommendations, the quantities used, the biological basis of the Commission's policy, the quantitative basis for its risk estimates, the structure of the system of protection, some problems of interpretation and application in that system, and the need for stability, consistency, and clarity in the Commission's recommendations. (author)

  20. Commissioning the Linac Coherent Light Source injector

    Directory of Open Access Journals (Sweden)

    R. Akre

    2008-03-01

    Full Text Available The Linac Coherent Light Source is a SASE x-ray free-electron laser (FEL project presently under construction at SLAC [J. Arthur et al., SLAC-R-593, 2002.]. The injector section, from drive laser and rf photocathode gun through first bunch compressor chicane, was installed in the fall of 2006. The initial system commissioning with an electron beam was completed in August of 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photocathode drive laser, rf gun, photocathode, S-band and X-band rf systems, first bunch compressor, and the various beam diagnostics.

  1. Large Cryogenic Infrastructure for LHC Superconducting Magnet and Cryogenic Component Tests: Layout, Commissioning and Operational Experience

    International Nuclear Information System (INIS)

    Calzas, C.; Chanat, D.; Knoops, S.; Sanmarti, M.; Serio, L.

    2004-01-01

    The largest cryogenic test facility at CERN, located at Zone 18, is used to validate and to test all main components working at cryogenic temperature in the LHC (Large Hadron Collider) before final installation in the machine tunnel. In total about 1300 main dipoles, 400 main quadrupoles, 5 RF-modules, eight 1.8 K refrigeration units will be tested in the coming years.The test facility has been improved and upgraded over the last few years and the first 18 kW refrigerator for the LHC machine has been added to boost the cryogenic capacity for the area via a 25,000 liter liquid helium dewar. The existing 6 kW refrigerator, used for the LHC Test String experiments, will also be employed to commission LHC cryogenic components.We report on the design and layout of the test facility as well as the commissioning and the first 10,000 hours operational experience of the test facility and the 18 kW LHC refrigerator

  2. Chiral measurements with the Fixed-Point Dirac operator and construction of chiral currents

    International Nuclear Information System (INIS)

    Hasenfratz, P.; Hauswirth, S.; Holland, K.; Joerg, T.; Niedermayer, F.

    2002-01-01

    In this preliminary study, we examine the chiral properties of the parametrized Fixed-Point Dirac operator D FP , see how to improve its chirality via the Overlap construction, measure the renormalized quark condensate Σ-circumflex and the topological susceptibility χ t , and investigate local chirality of near zero modes of the Dirac operator. We also give a general construction of chiral currents and densities for chiral lattice actions

  3. Point-form electrodynamics and the construction of conserved current operators

    International Nuclear Information System (INIS)

    Klink, W.H.

    2003-01-01

    A general procedure for constructing conserved electromagnetic current operators in the presence of hadronic interactions is given. The four-momentum operator in point-form relativistic quantum mechanics is written as the sum of hadronic, photon, and electromagnetic four-momentum operators, where the electromagnetic four-momentum operator is generated from a vertex operator, in which a conserved current operator is contracted with the four-vector potential operator. The current operator is the sum of free, dynamically determined and model-dependent operators. The dynamically determined current operator is formed form a free current operator and the interacting hadronic four-momentum operator, in such a way that the sum of free and dynamically determined current operators is conserved with respect to the hadronic interactions. The model-dependent operator is a many-body current operator, formed as the commutator of an antisymmetric operator with the hadronic four-momentum operator. It is shown that such an operator is also conserved with respect to the hadronic interactions and also does not renormalize the charge. Refs. 9 (author)

  4. Regulatory safety aspects of nuclear waste management operations in India

    International Nuclear Information System (INIS)

    Sundararajan, A.R.

    2000-01-01

    The Department of Atomic Energy in India as part of its programme to harness the nuclear energy for generation of nuclear power has been operating a whole range of nuclear fuel cycle facilities including waste management plants for more than four decades. The waste management plants include three high level waste immobilisation plants, one in operation, one under commissioning and one more under construction. Atomic Energy Regulatory Board is mandated to review and authorise from the safety angle the siting, the design, the construction and the operation of the waste management plants. The regulatory procedures, which involve multi-tier review adopted for ensuring the safety of these facilities, are described in this paper. (author)

  5. Significant advantages of the safety-first concept in construction, operation, and maintenance of the Westinghosue AP1000 reactor

    International Nuclear Information System (INIS)

    Cummins, E.; Benitz, K.

    2004-01-01

    In June 2003, the U.S. Nuclear Regulatory Commission (USNRC) published a draft opinion about safety of the AP1000 Westinghouse pressurized water reactor with 'passive safety' features. The report constitutes an important milestone in the development of the next generation of safe and cost-efficient nuclear power plants. A new AP1000 can be absolutely competitive with fossil fired power plants and may be able to revive the construction of new nuclear power plants worldwide. The reason for designing the AP1000 were safety considerations. The use of passive safety systems at the same time entails a considerable reduction in the costs of design, maintenance, and operation of an AP1000 plant. Independent experts confirmed that an AP1000 can be erected within three years or even less. The estimated electricity generating costs of an AP1000 plant in the United States amount to US Cent 3.2 to 3.6 per kilowatthour. (orig.)

  6. Impact of oil on the marine environment: policy of the Paris Commission on operational discharges from the offshore industry

    International Nuclear Information System (INIS)

    Nihoul, C.; Ducrotoy, J.-P.

    1994-01-01

    The input of oil to the North Sea due to the offshore industry has been estimated at 29% of the total input of oil. The operational discharges consist of production water and drilling cuttings. An overview of statistics collected over the last 10 years shows that although the amount of oil discharged via production water is increasing as platforms are getting older, cuttings still account for 75% of the oil entering the sea as a result of normal operations. Spills represent a relatively small source of oil. The effects on the marine environment of discharges of production water and of discarded oily cuttings have been extensively studied, by national authorities as well as by the industry. Although it has not always been possible to reach consensus about the significance of the observed effects, a number of 'agreed facts' have led to the establishment of regulations in the framework of the Paris Commission. The 'decisions' and 'recommendations' adopted by the Commission are regularly reviewed in the light of new developments. (author)

  7. Technology Solutions Case Study: Design Guidance for Passive Vents in New Construction, Multifamily Buildings

    Energy Technology Data Exchange (ETDEWEB)

    None

    2016-02-12

    In an effort to improve indoor air quality in high-performance, new construction, multifamily buildings, dedicated sources of outdoor air are being implemented. Passive vents are being selected by some design teams over other strategies because of their lower first costs and operating costs. The U.S. Department of Energy’s Building America research team Consortium for Advanced Residential Buildings constructed eight steps, which outline the design and commissioning required for these passive vents to perform as intended.

  8. Operation environment construction of geological information database for high level radioactive waste geological disposal

    International Nuclear Information System (INIS)

    Wang Peng; Gao Min; Huang Shutao; Wang Shuhong; Zhao Yongan

    2014-01-01

    To fulfill the requirements of data storage and management in HLW geological disposal, a targeted construction method for data operation environment was proposed in this paper. The geological information database operation environment constructed by this method has its unique features. And it also will be the important support for HLW geological disposal project and management. (authors)

  9. 75 FR 76444 - Environmental Impact Statement (EIS) for Construction and Operation of a Panoramic Survey...

    Science.gov (United States)

    2010-12-08

    ... potential environmental impacts associated with construction and operation of the proposed Panoramic Survey... DEPARTMENT OF DEFENSE Department of the Air Force Environmental Impact Statement (EIS) for Construction and Operation of a Panoramic Survey Telescope and Rapid Response System (Pan-STARRS) at the Summit...

  10. A Systems Engineering Framework for Design, Construction and Operation of the Next Generation Nuclear Plant

    International Nuclear Information System (INIS)

    Edward J. Gorski; Charles V. Park; Finis H. Southworth

    2004-01-01

    Not since the International Space Station has a project of such wide participation been proposed for the United States. Ten countries, the European Union, universities, Department of Energy (DOE) laboratories, and industry will participate in the research and development, design, construction and/or operation of the fourth generation of nuclear power plants with a demonstration reactor to be built at a DOE site and operational by the middle of the next decade. This reactor will be like no other. The Next Generation Nuclear Plant (NGNP) will be passively safe, economical, highly efficient, modular, proliferation resistant, and sustainable. In addition to electrical generation, the NGNP will demonstrate efficient and cost effective generation of hydrogen to support the President's Hydrogen Initiative. To effectively manage this multi-organizational and technologically complex project, systems engineering techniques and processes will be used extensively to ensure delivery of the final product. The technological and organizational challenges are complex. Research and development activities are required, material standards require development, hydrogen production, storage and infrastructure requirements are not well developed, and the Nuclear Regulatory Commission may further define risk-informed/performance-based approach to licensing. Detailed design and development will be challenged by the vast cultural and institutional differences across the participants. Systems engineering processes must bring the technological and organizational complexity together to ensure successful product delivery. This paper will define the framework for application of systems engineering to this $1.5B - $1.9B project

  11. arXiv Medical Physics Commissioning

    CERN Document Server

    Meer, David

    The medical commissioning is an important step to bring a particle gantry into clinical operation for tumour treatments. This involves the parametrization and characterization of all relevant systems including the beam delivery, the patient table, the imaging systems and the connection to all required software components. This article is limited to necessary tasks for the beam delivery system of a pencil beam scanning system. Usually the commissioning starts with the characterization of the unscanned beam and the calibration of the beam energy. The following steps are the parametrization of the scanning system, the commissioning of the beam position monitoring system and characterization of the spot size, all requiring precisions better than 1 mm. The commissioning effort for these tasks depends also on the gantry topology. Finally, the calibration of the dose measurement system ensures that any dose distribution can be delivered with an absolute precision better than 1%.

  12. Design, construction, operation, shutdown and surveillance of repositories for solid radioactive wastes in shallow ground

    International Nuclear Information System (INIS)

    1984-01-01

    This report is a part of the IAEA publications under its Programme on Underground Disposal of Radioactive Wastes and is addressed to administrative and technical authorities and specialists who consider the shallow-ground disposal of low- and intermediate-level solid radioactive wastes of short half-lives. The report emphasizes the technological aspects, however it briefly discusses the safety philosophy and regulatory considerations too. The design, construction, operation, shutdown and surveillance of the repositories in shallow ground are considered in some detail, paying special attention to their interrelated aspects. In particular, a review is given of the following aspects: main design and construction considerations in relation to the natural features of the site; design and construction aspects during the repository development process; activities related to operational and post-operational stages of the repository; major steps in repository operation and essential activities in shutdown and operational and post-operational surveillance

  13. Radiological emergency preparedness arrangements in the European Commission

    International Nuclear Information System (INIS)

    Tanner, V.

    2002-01-01

    The purpose of this paper is to give an overview of the different procedures established within the European Commission, which are relevant to radiological emergency planning and response. Although emergency preparedness is a national responsibility within the European Union, the Commission has clearly defined operational tasks in terms of emergency information exchange and community foodstuff regulations. In addition the Commission promotes research programmes and training courses in the field

  14. Indexes to Nuclear Regulatory Commission issuances, January-March 1988

    International Nuclear Information System (INIS)

    1988-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full test reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); and Type of issuance (memorandum, order, decision, etc.)

  15. Indexes to Nuclear Regulatory Commission issuances, January--June 1988

    International Nuclear Information System (INIS)

    1988-09-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administration Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petition of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  16. Commissioning and Operational Experience with 1 kW Class Helium Refrigerator/Liquefier for SST-1

    Science.gov (United States)

    Dhard, C. P.; Sarkar, B.; Misra, Ruchi; Sahu, A. K.; Tanna, V. L.; Tank, J.; Panchal, P.; Patel, J. C.; Phadke, G. D.; Saxena, Y. C.

    2004-06-01

    The helium refrigerator/liquefier (R/L) for the Steady State Super conducting Tokamak (SST-1) has been developed with very stringent specifications for the different operational modes. The total refrigeration capacity is 650 W at 4.5 K and liquefaction capacity of 200 l/h. A cold circulation pump is used for the forced flow cooling of 300 g/s supercritical helium (SHe) for the magnet system (SCMS). The R/L has been designed also to absorb a 200 W transient heat load of the SCMS. The plant consists of a compressor station, oil removal system, on-line purifier, Main Control Dewar (MCD) with associated heat exchangers, cold circulation pump and warm gas management system. An Integrated Flow Control and Distribution System (IFDCS) has been designed, fabricated and installed for distribution of SHe in the toroidal and poloidal field coils as well as liquid helium for cooling of 10 pairs of current leads. A SCADA based control system has been designed using PLC for R/L as well as IFDCS. The R/L has been commissioned and required parameters were achieved confirming to the process. All the test results and commissioning experiences are discussed in this paper.

  17. Appalachian Regional Commission: 1979 Annual Report.

    Science.gov (United States)

    Appalachian Regional Commission, Washington, DC.

    Narrative text, tables, maps, and photographs present an overview of the Appalachian Regional Commission's (ARC) activities in fiscal year 1979, past achievements, and future goals. Major accomplishments of 1979 include: utilization of the $233 million appropriation for highway construction; approval of over $143 million in ARC funds for 985…

  18. Design and operating condition. Consequences for EDF NPP's chemistry

    International Nuclear Information System (INIS)

    Bretelle, Jean-Luc; Stutzmann, Agnes; Nordmann, Francis

    2009-01-01

    Since the beginning of the French nuclear programme in 1977, four major types of design have been commissioned, the fifth one being under construction (EPR). The paper points out advantages and drawbacks of chemistry choices for the primary, secondary and tertiary systems in French NPP, for each design particularity and it describes the corresponding operating conditions. Chemistry option proposals are drawn for the future of the French fleet, taking into account the material behaviour and the operation improvement. (orig.)

  19. Construction and initial operation of the Advanced Toroidal Facility

    International Nuclear Information System (INIS)

    Bell, G.L.; Bell, J.D.; Benson, R.D.

    1989-08-01

    The Advanced Toroidal Facility (ATF) torsatron was designed on a physics basis for access to the second stability regime and on an engineering basis for independent fabrication of high-accuracy components. The actual construction, assembly, and initial operation of ATF are compared with the characteristics expected during the design of ATF. 31 refs., 19 figs., 2 tabs

  20. President's Commission and the normal accident

    International Nuclear Information System (INIS)

    Perrow, C.

    1982-01-01

    This chapter incorporates the major points of an analysis of the accident at Three Mile Island that I prepared in September 1979. In contrast to the findings of the President's Commission (1979), I did not view the accident as the result of operator error, an inept utility, or a negligent Nuclear Regulatory Commission but as a consequence of the complexity and interdependence that characterize the system itself. I argued that the accident was inevitable-that is, that it could not have been prevented, foreseen, or quickly terminated, because it was incomprehensible. It resembled other accidents in nuclear plants and in other high risk, complex and highly interdependent operator-machine systems; none of the accidents were caused by management or operator ineptness or by poor government regulation, though these characteristics existed and should have been expected. I maintained that the accident was normal, because in complex systems there are bound to be multiple faults that cannot be avoided by planning and that operators cannot immediately comprehend

  1. Status of the Commissioning of SOLEIL

    International Nuclear Information System (INIS)

    Filhol, J. M.; Couprie, M. E.; Level, M. P.; Besson, J. C.; Brunelle, P.; Denard, J. C.; Godefroy, J. M.; Herbeaux, C.; Lebasque, P.; Le Roux, V.; Lestrade, A.; Loulergue, A.; Marchand, P.; Nadji, A.; Nadolski, L.; Nagaoka, R.; Pottin, B.; Tordeux, M. A.

    2007-01-01

    SOLEIL is a third generation Synchrotron radiation Source, under construction in France at St Aubin, near Paris. The Storage Ring consists in a 357 m circumference ring, with 16 cells and 24 straight sections (4x12m, 12x7m, 8x3.6m), out of which up to 21 will house insertion devices. The optics, with distributed dispersion, features a low 3.7 nm.rad emittance at the 2.75 GeV operating energy, so as to provide high brilliance, from the VUV up to the hard X ray domain. In order to provide a long lifetime, and beam position stabilities in the micron range, significant attention was paid at each design stage (optics, magnets, beam position monitors, vacuum and RF systems,..), including the design of the building and infrastructure, the construction of which is now complete. This resulted in some unprecedented approaches such as the intensive use of NEG coating Aluminium vessels, or the development of a dedicated superconducting RF cavity and of 190 kW solid state RF amplifiers. The construction, started in 2002, is now completed. The injector system (100 MeV Linac) and the 3 Hz full energy Booster synchrotron have reached nominal operating conditions by fall 2005. The installation of the Storage Ring was just completed and its commissioning started in May 2006. First 9 turns in the ring were achieved on May the 14th, and visible synchrotron radiation was also observed on a CCD camera. Innovative insertion devices were designed and built so as to provide the best possible performances in an energy range as large as 5 eV to 20 keV. These are helical electromagnetic devices with 640 mm and 256 mm periods, APPLE II type undulators with 80 mm period, and in-vacuum hybrid undulators with 20 mm period. Two infra-red beamlines providing both edge and constant dipole field emission are also under construction and a superconducting wiggler is currently being designed in order to provide high flux in the 10 to 50 keV range. A first set of 10 beamlines (out of 24 included in the

  2. The commissioning of nuclear power plants

    International Nuclear Information System (INIS)

    1989-09-01

    The objectives and requirements to be met in commissioning nuclear power plants are presented. The objective of commissioning is to ensure that each component, subsystem, system, or structure in a plant will be capable of fulfilling its design requirements throughout its design life. The requirements for commissioning are: the preparation of a detailed, comprehensive, documented program to demonstrate that all components, systems and structures relevant to safety meet design intent; documented evidence that safety systems are fully operable and can meet design requirements; and, appropriate documentation of the actual state or behaviour of all components, systems and structures relevant to safety. All systems must be included in the commissioning program. Whenever possible, full safety system test should be performed. If a full system in situ test is not possible, alternative means are suggested. (8 refs.)

  3. Design and Construction of Operation Bridge for Research Reactor

    International Nuclear Information System (INIS)

    Jung, Kwangsub; Choi, Jinbok; Lee, Jongmin; Oh, Jinho

    2015-01-01

    The operation bridge contains a lower working deck mounted on a saddle that travels on rails. Upright members are mounted on the saddle to support the upper structure and two hoist monorails. The saddle contains an anti-derail system that is composed of seismic lugs and guide rollers. The operation bridge travels along the rails to transport the fuel assembly, irradiated object, and reactor components in the pools by using tools. Hoists are installed at the top girder. The hoist is suspended from the monorail by means of a motor driven trolley that runs along the monorail. Movements of hoist and trolley are controlled by using the control pendant switch. Processes of design and construction of the operation bridge for the research reactor are introduced. The operation bridge is designed under consideration of functions of handling equipment in the pool and operational limits for safety. Structural analysis is carried out to evaluate the structural integrity in the seismic events. Tests and inspections are also performed during fabrication and installation to confirm the function and safety of the operation bridge

  4. Design improvements, construction and operating experience with BWRs in Japan

    International Nuclear Information System (INIS)

    Uchigasaki, G.; Yokomi, M.; Sasaki, M.; Aoki, R.; Hashimoto, H.

    1983-01-01

    (1) The first domestic-made 1100-MW(e) BWR in Japan commenced commercial operation in April 1982. The unit is the leading one of the subsequent three in Fukushima Daini nuclear power station owned by the Tokyo Electric Power Company Inc. (Tepco). Based on the accumulated construction and operation experience of 500-MW(e) and 800-MW(e) class BWRs, improvements in various aspects during both the design and construction stages were introduced in core and fuel design with advanced gadolinia distribution, reactor feedwater treatment technology for crud reduction, a radwaste island, control and instrumentation to cope with the lessons learned through Three Mile Island assessment etc. (2) Based on many operating experiences with BWRs, an improved BWR core, which has easier operability and higher load factor than the conventional core, has been developed. The characteristic of the improved core is ''axially two-zoned uranium enrichment distribution''; the enrichment of the upper part of the fuel is slightly higher than that of the lower part. Through the improved core it became possible to optimize the axial power flattening and core reactivity control separately by axial enrichment distribution and burnable poison content. The improved fuels were loaded into operating BWRs and successfully proved the performance by this experience. (3) To shorten annual outage time, to reduce radiation exposure, to save manpower, and to achieve high reliability and safety of inspection operation, the remote automatic service and inspection equipment were developed in Japan. This paper presents the concept, distinctive features, and actual operation experience of the automatic refuelling machine, control-rod drive (CRD) remote-handling machine, improved main steam line isolation plug, and the automated ultrasonic inspection system with a computerized data processing unit, which have been developed by Hitachi, Ltd. with excellent results. (author)

  5. Minimum Bias Trigger Scintillators for ATLAS: Commissioning and Run 2 Initial Operation

    CERN Document Server

    Dano Hoffmann, Maria; The ATLAS collaboration

    2015-01-01

    The Minimum Bias Trigger Scintillators (MBTS) delivered the primary trigger for selecting events from low luminosity proton-proton, lead-lead and lead-proton collisions with the smallest possible bias during LHC Run 1 (2009-2013). Similarly, the MBTS will select events for the first Run 2 physics measurements, for instance charge multiplicity, proton-proton cross section, rapidity gap measurements, etc. at the unprecedented 13 TeV center of mass energy of proton-proton collisions. We will review the upgrades to the MBTS detector that have been implemented during the 2013-2014 shutdown. New scintillators have been installed to replace the radiation damaged ones, a modified optical readout scheme have been adopted to increase the light yield and an improved data acquisition chain has been used to cope with the few issues observed during Run 1 operations. Since late 2014, MBTS have been commissioned during cosmic data taking, first LHC beam splashes and single beam LHC fills. The goal is to have a fully commissi...

  6. National Bioethics Commissions as Educators.

    Science.gov (United States)

    Lee, Lisa M

    2017-05-01

    As has become tradition, executive directors of United States' presidential bioethics committees offer reflections about their experience shortly after the orderly shutdown of the commission staff. After the records are filed according to government records regulations; after all the staff members, who are hired into temporary positions that must be renewed every two years, have secured permanent employment; after preparations are made to ensure that the next commission staff (should there be one) has a budget and standard operating procedures in order to begin its work in a timely manner; after the lights are turned out for the last time, the executive director makes the final climb up the stairs into the sunlight and reflects on the whirlwind. There is much about my work with the Presidential Commission for the Study of Bioethical Issues that deserves comment, but one aspect of the commission that has been especially valuable to me is its work to educate the nation on bioethical issues. This is, moreover, a contribution in which the commission staff was central, and it is one that, as an ethics educator myself, I will cherish deeply. © 2017 The Hastings Center.

  7. The Commissioning of the LHC Technical Systems

    CERN Document Server

    Saban, R; Baggiolini, V; Ballarino, A; Barbero-Soto, E; Bellesia, B; Bordry, Frederick; Bozzini, D; Casas-Lino, M-P; Chareyre, V; Claudet, S; Coelingh, G-J; Dahlerup-Petersen, K; Denz, R; Fehér, S; Flora, R; Gruwé, M; Kain, V; Kirby, G; Koratzinos, M; Lauckner, R; Le Naour, S; Mess, K-H; Millet, F; Montabonnet, V; Nisbet, D; Perea-Solano, B; Pojer, M; Principe, R; Rabehl, R; Rijllart, A; Redaelli, S; Rodríguez-Mateos, F; Schmidt, R; Serio, L; Siemko, A; Solfaroli-Camillocci, M; Thiesen, H; Venturini, W; Vergara-Fernandez, A; Verweij, A; Zerlauth, M

    2007-01-01

    The LHC is an accelerator with unprecedented complexity where the energy stored in magnets and the beams exceeds other accelerators by one-to-two orders of magnitude. To ensure a safe and efficient machine start-up without being plagued by technical problems, a phase of "hardware commissioning" was introduced: a thorough commissioning of technical systems without beam. This activity started in June 2005 with the commissioning of individual systems, followed by operating a full sector, one eighth of the machine; the commissioning is expected to last until spring 2008 when commissioning with beam will start. The LHC architecture allows the commissioning of each of the eight sectors independently from the others, before the installation of other sectors is complete. An important effort went into the definition of the programme and the organization of the coordination in the field, as well as in the preparation of the tools to record and analyze test results. This paper discusses the experience with this approach...

  8. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    International Nuclear Information System (INIS)

    Zeitoun, A.

    1994-08-01

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF 6 , using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility

  9. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    Energy Technology Data Exchange (ETDEWEB)

    Zeitoun, A. [Science Applications International Corp., Germantown, MD (United States)

    1994-08-01

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.

  10. 77 FR 43855 - Secretarial Commission on Indian Trust Administration and Reform

    Science.gov (United States)

    2012-07-26

    ... Secretary regarding termination. The following items will be on the agenda: Trust Commission Operations... DEPARTMENT OF THE INTERIOR Office of the Secretary Secretarial Commission on Indian Trust... Office of the Secretary is announcing that the Secretarial Commission on Indian Trust Administration and...

  11. Commissioning of the ATLAS Experiment

    CERN Document Server

    AUTHOR|(CDS)2069446

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focusing on simultaneous running and combined track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  12. Report to the US Nuclear Regulatory Commission on analysis and evaluation of operational data - 1987: Power reactors

    Energy Technology Data Exchange (ETDEWEB)

    None

    1988-10-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1987. The report is published in two volumes. NUREG-1272, Vol. 2, No. 1, covers Power Reactors and presents an overview of the operating experience of the nuclear power industry, with comments regarding the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from Licensee Event Reports, the NRC's Operations Center, and Diagnostic Evaluations. NUREG-1272, Vol. 2, No. 2, covers Nonreactors and presents a review of the nonreactors events and misadministration reports that were reported in 1987 and a brief synopsis of AEOD studies published in 1987. Each volume contains a list of the AEOD Reports issued for 1980-1987.

  13. Management of nuclear power plants for safe operation

    International Nuclear Information System (INIS)

    1984-01-01

    This Guide identifies the main objectives and responsibilities of management with respect to safe operation of nuclear power plants. The Guide discusses the factors to be considered in structuring the operating organization to meet these objectives, to establish the management programmes that assure the safety tasks are performed, and to see that the services and facilities needed to accomplish the tasks are available. The Guide is primarily addressed to safety matters directly related to the operating phase. It assumes, in other words, that the safety aspects of siting, design, manufacturing and construction have been resolved. However, it also covers the interrelationships between operations and design, construction and commissioning, including the involvement of the operating organization in appropriate reviews of safety issues with reference to the future operating phase. The Guide is mainly restricted to matters of principle in relation to management-level decision making aimed at establishing safety policies. It is therefore not suitable for implementing such policies at the operational level. The IAEA Codes of Practice and Safety Guides provide detailed guidance for the latter purpose in those areas considered appropriate

  14. Operational Experience with a Cryogenic Axial-Centrifugal Compressor

    CERN Document Server

    Decker, L; Löhlein, K; Purtschert, W; Ziegler, B L; Lebrun, P; Tavian, L; Brunovsky, I; Tucek, L

    1998-01-01

    The Large Hadron Collider (LHC), presently under construction at CERN, requires large refrigeration capacity at 1.8 K. Compression of gaseous helium at cryogenic temperatures is therefore inevitable. Together with subcontractors, Linde Kryotechnik has developed a prototype machine. This unit is based on a cryogenic axial-centrifugal compressor, running on ceramic ball bearings and driven by a variable-frequency electrical motor operating at ambient temperature. Integrated in a test facility for superconducting magnets the machine has been commissioned without major problems and successfully gone through the acceptance test in autumn 1995. Subsequent steps were initiated to improve efficiency of this prototype. This paper describes operating experience gained so far and reports on measured performance prior to and after constructional modifications.

  15. 77 FR 30588 - R.J. Corman Railroad Company/Pennsylvania Lines Inc.-Construction and Operation Exemption-In...

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35116] R.J. Corman Railroad Company/Pennsylvania Lines Inc.-- Construction and Operation Exemption--In Clearfield County, PA.... 10901 for R.J. Corman Railroad Company/Pennsylvania Lines Inc. (RJCP) to construct and operate 10.8...

  16. Commissioning of the Cryogenic Plant for the Cryogenic Storage Ring (CSR) at Heidelberg

    CERN Document Server

    von Hahn, R; Grieser, M; Haberstroh, C; Kaiser, D; Lange, M; Laux, F; Menk, S; Orlov, D A; Repnow, R; Sieber, T; Quack, H; Varju, J; Wolf A

    2009-01-01

    At the Max-Planck-Institute for Nuclear Physics in Heidelberg a next generation electrostatic storage ring for low velocity atomic and molecular ion beams is under construction. In contrast to existing electrostatic storage rings, the Cryogenic Storage Ring CSR will be cooled down to temperatures below 2 K. Thus acting as a large cryopump it will provide long storage times and, in addition, open a new field of quantum state controlled molecular physics due to a low heat radiation background from space-like environment. A concept for cooling the storage ring has been developed and is presently tested by means of a linear trap as a prototype with a length of 1/10 of the planned ring. A commercial refrigerator with 21 W at 2 K has been successfully commissioned and was connected to the prototype. This paper presents the status of the cryogenic plant after the commissioning and one year of operation.

  17. Commissioning and first results of the ITER-relevant negative ion beam test facility ELISE

    International Nuclear Information System (INIS)

    Franzen, P.; Heinemann, B.; Fantz, U.; Wünderlich, D.; Kraus, W.; Fröschle, M.; Martens, C.; Riedl, R.; Nocentini, R.; Masiello, A.; Ruf, B.; Schiesko, L.; Wimmer, C.

    2013-01-01

    The test facility ELISE which was constructed in the last three years at the Max-Planck-Institut für Plasmaphysik (IPP), Garching, is an important intermediate step of the development of the neutral beam system for ITER. ELISE allows gaining an early experience of the performance and operation of large RF driven sources for negative hydrogen ions and will give an important input for the commissioning and the design of the SPIDER and MITICA test facilities at Padua and the ITER neutral beam system. ELISE has gone recently into operation with first plasma and beam pulses. The experiments aim at the demonstration of an ion beam at the required parameters within 2 years of operation until end of 2014, the end of the service contract with F4E for the establishment and exploitation of ELISE

  18. Design, construction, and operation of SciFi tracking detector for K2K experiment

    International Nuclear Information System (INIS)

    Suzuki, A.; Park, H.; Aoki, S.; Echigo, S.; Fujii, K.; Hara, T.; Iwashita, T.; Kitamura, M.; Kohama, M.; Kume, G.; Onchi, M.; Otaki, T.; Sato, K.; Takatsuki, M.; Takenaka, K.; Tanaka, Y.; Tashiro, K.; Inagaki, T.; Kato, I.; Mukai, S.; Nakaya, T.; Nishikawa, K.; Sasao, N.; Shima, A.; Yokoyama, H.; Chikamatsu, T.; Hayato, Y.; Ishida, T.; Ishii, T.; Ishino, H.; Jeon, E.J.; Kobayashi, T.; Lee, S.B.; Nakamura, K.; Oyama, Y.; Sakai, A.; Sakuda, M.; Tumakov, V.; Fukuda, S.; Fukuda, Y.; Ishizuka, M.; Itow, Y.; Kajita, T.; Kameda, J.; Kaneyuki, K.; Kobayashi, K.; Kobayashi, Y.; Koshio, Y.; Miura, M.; Moriyama, S.; Nakahata, M.; Nakayama, S.; Obayashi, Y.; Okada, A.; Sakurai, N.; Shiozawa, M.; Suzuki, Y.; Takeuchi, H.; Takeuchi, Y.; Totsuka, Y.; Toshito, T.; Yamada, S.; Miyano, K.; Nakamura, M.; Tamura, N.; Nakano, I.; Yoshida, M.; Kadowaki, T.; Kishi, S.; Yokoyama, H.; Maruyama, T.; Etoh, M.; Nishijima, K.; Bhang, H.C.; Khang, B.H.; Kim, B.J.; Kim, H.I.; Kim, J.H.; Kim, S.B.; So, H.; Yoo, J.H.; Choi, J.H.; Jang, H.I.; Jang, J.S.; Kim, J.Y.; Lim, I.T.; Pac, M.Y.; Kearns, E.; Scholberg, K.; Stone, J.L.; Sulak, L.R.; Walter, C.W.; Casper, D.; Gajewski, W.; Kropp, W.; Mine, S.; Sobel, H.; Vagins, M.; Matsuno, S.; Hill, J.; Jung, C.K.; Martens, K.; Mauger, C.; McGrew, C.; Sharkey, E.; Yanagisawa, C.; Berns, H.; Boyd, S.; Wilkes, J.; Kielczewska, D.; Golebiewska, U.

    2000-01-01

    We describe the construction and performance of a scintillating fiber detector used in the near detector for the K2K (KEK to Kamioka, KEK E362) long baseline neutrino oscillation experiment. The detector uses 3.7 m long and 0.692 mm diameter scintillating fiber coupled to image-intensifier tubes (IIT), and a CCD camera readout system. Fiber sheet production and detector construction began in 1997, and the detector was commissioned in March 1999. Results from the first K2K runs confirm good initial performance: position resolution is estimated to be about 0.8 mm, and track finding efficiency is 98±2% for long tracks (i.e., those which intersect more than 5 fiber planes). The hit efficiency was estimated to be 92±2% using cosmic-ray muons, after noise reduction at the offline stage. The possibility of using the detector for particle identification is also discussed

  19. Commissioning an Engineering Scale Coal Gasifier

    Energy Technology Data Exchange (ETDEWEB)

    Reid, Douglas J.; Bearden, Mark D.; Cabe, James E.

    2010-07-01

    This report explains the development, commissioning, and testing of an engineering scale slagging coal gasifier at PNNL. The initial objective of this project was to commission the gasifier with zero safety incidents. The commissioning work was primarily an empirical study that required an engineering design approach. After bringing the gasifier on-line, tests were conducted to assess the impact of various operating parameters on the synthesis gas (syngas) product composition. The long-term intent of this project is to produce syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in catalyst, materials, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for greater than 4 hours using coal feedstock. In addition, alternate designs that allow for increased flexibility regarding the fuel sources that can be used for syngas production is desired. Continued modifications to the fuel feed system will be pursued to address these goals. Alternative feed mechanisms such as a coal/methanol slurry are being considered.

  20. US Nuclear Regulatory Commission organization charts and functional statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-07-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices.

  1. US Nuclear Regulatory Commission organization charts and functional statements

    International Nuclear Information System (INIS)

    1996-01-01

    This document is the US NRC organizational structure and chart as of July 1, 1996. It contains the org charts for the Commission, ACRS, ASLAB, Commission staff offices, Executive Director for Operations, Office of the Inspector General, Program offices, and regional offices

  2. Spherical and plane integral operators for PDEs construction, analysis, and applications

    CERN Document Server

    Sabelfeld, Karl K

    2013-01-01

    The book presents integral formulations for partial differential equations, with the focus on spherical and plane integral operators. The integral relations are obtained for different elliptic and parabolic equations, and both direct and inverse mean value relations are studied. The derived integral equations are used to construct new numerical methods for solving relevant boundary value problems, both deterministic and stochastic based on probabilistic interpretation of the spherical and plane integral operators.

  3. Experience in Cuba in the licensing during import, commissioning and operation of an Irradiator LLCo ISOGAMMA

    International Nuclear Information System (INIS)

    Forteza, Yamil Lopez; Reyes, Yolanda Perez; Garcia, Jose R. Quevedo; Molina, Igor I. Sarabia; Gonzalez, Leonel Omarovich; Zubiaur, Omar Cruz

    2013-01-01

    This work presented the experiences during the process of licensing an irradiator ISOGAMMA LLCo model according to the recommendations of the International Atomic Energy (IAEA). Aspects of the safety assessment are detailed, as well as control and verification requirements for radiation safety and security at different stages of the process (import, transportation, installation irradiator loading 60Co sources, commissioning and operation) of irradiator recently installed in Cuba. The results of the evaluation carried a source of reference and consultation necessary for the work of the regulator to consider for similar processes that lie ahead in other facilities irradiation

  4. 47 CFR 22.1035 - Construction period.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Construction period. 22.1035 Section 22.1035 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES PUBLIC MOBILE SERVICES Offshore Radiotelephone Service § 22.1035 Construction period. The construction period (see § 22.142) for...

  5. Risk evaluation system for operational events and inspection findings

    International Nuclear Information System (INIS)

    Lopez G, A.; Godinez S, V.; Lopez M, R.

    2010-10-01

    The Mexican Nuclear Regulatory Commission has developed an adaptation of the US NRC Significance Determination Process (SDP) to evaluate the risk significance of operational events and inspection findings in Laguna Verde nuclear power plant. The Mexican Nuclear Regulatory Commission developed a plant specific flow chart for preliminary screening instead of the open questionnaire used by the US NRC-SDP, with the aim to improve the accuracy of the screening process. Also, the work sheets and support information tables required by the SDP were built up in an Excel application which allows to perform the risk evaluation in an automatic way, focusing the regulator staff efforts in the risk significance analysis instead of the risk calculation tasks. In order to construct this tool a simplified PRA model was developed and validated with the individual plant examination model. This paper shows the Mexican Nuclear Regulatory Commission process and some risk events evaluations performed using the Risk Evaluation System for Operational Events and Inspection Findings (SERHE, by its acronyms in Spanish). (Author)

  6. Three integrated photovoltaic/sound barrier power plants. Construction and operational experience

    International Nuclear Information System (INIS)

    Nordmann, T.; Froelich, A.; Clavadetscher, L.

    2002-01-01

    After an international ideas competition by TNC Switzerland and Germany in 1996, six companies where given the opportunity to construct a prototype of their newly developed integrated PV-sound barrier concepts. The main goal was to develop highly integrated concepts, allowing the reduction of PV sound barrier systems costs, as well as the demonstration of specific concepts for different noise situations. This project is strongly correlated with a German project. Three of the concepts of the competition are demonstrated along a highway near Munich, constructed in 1997. The three Swiss installations had to be constructed at different locations, reflecting three typical situations for sound barriers. The first Swiss installation was the world first Bi-facial PV-sound barrier. It was built on a highway bridge at Wallisellen-Aubrugg in 1997. The operational experience of the installation is positive. But due to the different efficiencies of the two cell sides, its specific yield lies somewhat behind a conventional PV installation. The second Swiss plant was finished in autumn 1998. The 'zig-zag' construction is situated along the railway line at Wallisellen in a densely inhabited area with some local shadowing. Its performance and its specific yield is comparatively low due to a combination of several reasons (geometry of the concept, inverter, high module temperature, local shadows). The third installation was constructed along the motor way A1 at Bruettisellen in 1999. Its vertical panels are equipped with amorphous modules. The report show, that the performance of the system is reasonable, but the mechanical construction has to be improved. A small trial field with cells directly laminated onto the steel panel, also installed at Bruettisellen, could be the key development for this concept. This final report includes the evaluation and comparison of the monitored data in the past 24 months of operation. (author)

  7. Participation of SKODA JS in the construction of the Temelin and Mochovce nuclear power plants

    International Nuclear Information System (INIS)

    Svec, A.; Zach, J.; Ruzicka, P.

    2000-01-01

    SKODA JS is the traditional manufacturer of WWER type reactor equipment and also supplier of the primary circuits and of equipment for the transport, refuelling and storage of fuel for Ver type nuclear power plants built in the Czech and Slovak Republics. The paper deals with activities of the company SKODA JS at two power plants whose reactor units are close to completion, viz. the Mochovce NPP in the Slovak Republic (4 x Ver 440 MW; unit 1 was put in operation in 1998, unit 2 is in the stage of commissioning, units 3 and 4 are not to be completed) and the Temelin NPP in the Czech Republic (2 x Ver 1000 MW, commissioning of units 1 and 2 is expected in 2001 and 2002, respectively). The scope of supplies to the two nuclear power plants (detailed design, delivery of equipment, installation, commissioning) and the course of construction from SKODA JS's viewpoint are described. The most important design changes and improvements made during the construction are highlighted. (author)

  8. The licensing procedure for construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Salvatore, J.E.L.

    1980-03-01

    The licensing procedure for the construction and operation of the nuclear power plants in Brazil is analysed, according to the International Atomic Energy Agency orientation. The risks related to the nuclear energy is also emphasized. (A.L.) [pt

  9. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  10. Report of nuclear utility industry responses to Kemeny Commission recommendations

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1989-02-15

    The purpose of this paper is to provide a report of nuclear utility industry progress in responding to the recommendations of the President's Commission on the Accident at Three Mile Island (The Kemeny Commission). On April 11, 1979, in response to TMI, President Carter established a Commission to conduct '.... a comprehensive study and investigation of the recent accident involving the nuclear power facility on Three Mile Island in Pennsylvania'. The Commission was chaired by Dr. John G. Kemeny, then President of Dartmouth College. (A list of all members of The Kemeny Commission is provided in Attachment to the Appendix ). The report of the commission's findings and recommendations was transmitted to the President in October 1979. During this same period, the nuclear utility industry responded to TMI by creating the Institute of Nuclear Power Operations (INPO) with a mission to promote the highest levels of safety and reliability - to promote excellence - in the operation of nuclear electric generating plants. In addition, the Nuclear Safety Analysis Center (NSAC) was established at the Electric Power Research Institute (EPRI to evaluate the accident and assist in determining the best industry response. In a White House paper (and press release) of December 7 1979, the President announced that he agreed fully with the spirit and intent of al the Kemeny Commission recommendations and requested that the industry and The Nuclear Regulatory Commission (NRC) comply with the recommendations. The President also recognized the industry initiative in establishing INPO and called for several actions involving the Institute; the President directed the Department of Energy and other government agencies to provide assistance to INPO and the industry. An overall status of the nuclear utility industry responses to Kemeny Commission recommendations in the key areas directly related to nuclear plant operations is provided below. A more detailed status of industry responses to the

  11. Report of nuclear utility industry responses to Kemeny Commission recommendations

    International Nuclear Information System (INIS)

    1989-02-01

    The purpose of this paper is to provide a report of nuclear utility industry progress in responding to the recommendations of the President's Commission on the Accident at Three Mile Island (The Kemeny Commission). On April 11, 1979, in response to TMI, President Carter established a Commission to conduct '.... a comprehensive study and investigation of the recent accident involving the nuclear power facility on Three Mile Island in Pennsylvania'. The Commission was chaired by Dr. John G. Kemeny, then President of Dartmouth College. (A list of all members of The Kemeny Commission is provided in Attachment to the Appendix ). The report of the commission's findings and recommendations was transmitted to the President in October 1979. During this same period, the nuclear utility industry responded to TMI by creating the Institute of Nuclear Power Operations (INPO) with a mission to promote the highest levels of safety and reliability - to promote excellence - in the operation of nuclear electric generating plants. In addition, the Nuclear Safety Analysis Center (NSAC) was established at the Electric Power Research Institute (EPRI to evaluate the accident and assist in determining the best industry response. In a White House paper (and press release) of December 7 1979, the President announced that he agreed fully with the spirit and intent of al the Kemeny Commission recommendations and requested that the industry and The Nuclear Regulatory Commission (NRC) comply with the recommendations. The President also recognized the industry initiative in establishing INPO and called for several actions involving the Institute; the President directed the Department of Energy and other government agencies to provide assistance to INPO and the industry. An overall status of the nuclear utility industry responses to Kemeny Commission recommendations in the key areas directly related to nuclear plant operations is provided below. A more detailed status of industry responses to the

  12. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-11-01

    This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition.

  13. Opinions and decisions of the Nuclear Regulatory Commission with selected orders, July 1, 1995--December 31, 1995. Volume 42, Pages 1-258

    International Nuclear Information System (INIS)

    1996-01-01

    This is the 42nd volume of issuances of the U.S. Nuclear Regulatory Commission (NRC) and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. This book is a reprinting, containing corrections of numerous printing errors in a previously distributed book. It covers the period from July 1, 1995 to December 31, 1995. Atomic Safety and Licensing Boards conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities, and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. The hardbound edition of the Nuclear Regulatory Commission Issuances is a final compilation of the monthly issuances. It includes all of the legal precedents for the agency within a 6-month period. Any opinions, decisions, denials, memoranda and orders of the Commission inadvertently omitted from the monthly editions and any corrections submitted by the NRC legal staff to the printed softbound issuances are contained in the hardbound edition

  14. Large scale commissioning and operational experience with tier-2 to tier-2 data transfer links in CMS

    International Nuclear Information System (INIS)

    Letts, J; Magini, N

    2011-01-01

    Tier-2 to Tier-2 data transfers have been identified as a necessary extension of the CMS computing model. The Debugging Data Transfers (DDT) Task Force in CMS was charged with commissioning Tier-2 to Tier-2 PhEDEx transfer links beginning in late 2009, originally to serve the needs of physics analysis groups for the transfer of their results between the storage elements of the Tier-2 sites associated with the groups. PhEDEx is the data transfer middleware of the CMS experiment. For analysis jobs using CRAB, the CMS Remote Analysis Builder, the challenges of remote stage out of job output at the end of the analysis jobs led to the introduction of a local fallback stage out, and will eventually require the asynchronous transfer of user data over essentially all of the Tier-2 to Tier-2 network using the same PhEDEx infrastructure. In addition, direct file sharing of physics and Monte Carlo simulated data between Tier-2 sites can relieve the operational load of the Tier-1 sites in the original CMS Computing Model, and already represents an important component of CMS PhEDEx data transfer volume. The experience, challenges and methods used to debug and commission the thousands of data transfers links between CMS Tier-2 sites world-wide are explained and summarized. The resulting operational experience with Tier-2 to Tier-2 transfers is also presented.

  15. Construction and operation of the Howard T. Ricketts Laboratory.

    Energy Technology Data Exchange (ETDEWEB)

    Van Lonkhuyzen, R.; Stull, L.; Butler, J.; Chang, Y.; Allison, T.; O' Rourke, D.

    2006-01-01

    The National Institutes of Health (NIH) has proposed to partially fund the construction of the Howard T. Ricketts (HTR) regional biocontainment laboratory (RBL) by the University of Chicago at the U.S. Department of Energy's (DOE's) Argonne National Laboratory in Argonne, Illinois. The HTR Laboratory (HTRL) would be constructed, owned, and operated by the University of Chicago on land leased to it by DOE. The preferred project site is located north of Eastwood Drive and west of Outer Circle Road and is near the biological sciences building. This environmental assessment addresses the potential environmental effects resulting from construction and operation of the proposed facility. The proposed project involves the construction of a research facility with a footprint up to approximately 44,000 ft{sup 2} (4,088 m{sup 2}). The proposed building would house research laboratories, including Biosafety Level 2 and 3 biocontainment space, animal research facilities, administrative offices, and building support areas. The NIH has identified a need for new facilities to support research on potential bioterrorism agents and emerging and re-emerging infectious diseases, to protect the nation from such threats to public health. This research requires specialized laboratory facilities that are designed, managed, and operated to protect laboratory workers and the surrounding community from accidental exposure to agents. The proposed HTRL would provide needed biocontainment space to researchers and promote the advancement of knowledge in the disciplines of biodefense and emerging and re-emerging infectious diseases. Several alternatives were considered for the location of the proposed facility, as well as a no action alternative. The preferred alternative includes the construction of a research facility, up to 44,000 ft{sup 2} (4,088 m{sup 2}), at Argonne National Laboratory, a secure government location. Potential impacts to natural and cultural resources have been

  16. Conceptual design and analysis of roads and road construction machinery for initial lunar base operations

    Science.gov (United States)

    Sines, Jeffrey L.; Banks, Joel; Efatpenah, Keyanoush

    1990-01-01

    Recent developments have made it possible for scientists and engineers to consider returning to the Moon to build a manned lunar base. The base can be used to conduct scientific research, develop new space technology, and utilize the natural resources of the Moon. Areas of the base will be separated, connected by a system of roads that reduce the power requirements of vehicles traveling on them. Feasible road types for the lunar surface were analyzed and a road construction system was designed for initial lunar base operations. A model was also constructed to show the system configuration and key operating features. The alternate designs for the lunar road construction system were developed in four stages: analyze and select a road type; determine operations and machinery needed to produce the road; develop machinery configurations; and develop alternates for several machine components. A compacted lunar soil road was selected for initial lunar base operations. The only machinery required to produce this road were a grader and a compactor. The road construction system consists of a main drive unit which is used for propulsion, a detachable grader assembly, and a towed compactor.

  17. Progress Report on the Construction of SOLEIL

    CERN Document Server

    Level, Marie Paule; Brunelle, Pascale; Chaput, Roger; Dael, Antoine; Denard, Jean-Claude; Filhol, Jean-Marc; Godefroy, Jean-Marie; Herbeaux, Christian; Le Roux, V; Marchand, Patrick; Nadji, Amor; Nadolski, Laurent S; Nagaoka, Ryutaro; Tordeux, M A

    2005-01-01

    This paper reports the progress achieved in the construction of the accelerators of SOLEIL. Started in January 2002, the construction comes near to its end and the installation of the equipment on the site has begun from September 2004 and shall be completed within one year. The progress on the LINAC and Booster are reported separately, therefore this paper will focus more particularly on the Storage Ring: Dedicated measuring benches have been built to perform the magnetic measurements on all the magnets and the results of measurements have been analysed in term of particle dynamics behaviour in order to prepare the operating point for the commissioning. The status of innovative developments engaged from the beginning as super-conducting RF cavities, NEG coated vacuum chambers and BPMs digital electronics will be described. The construction of the first 6 insertion devices is also well advanced and will be reported. Finally, the machine impedance budget was further evaluated with consequently, still some modi...

  18. Effects of golf course construction and operation on water chemistry of headwater streams on the Precambrian Shield

    International Nuclear Information System (INIS)

    Winter, Jennifer G.; Dillon, Peter J.

    2005-01-01

    To investigate the effects of golf course construction and operation on the water chemistry of Shield streams, we compared the water chemistry in streams draining golf courses under construction (2) and in operation (5) to streams in forested reference locations and to upstream sites where available. Streams were more alkaline and higher in base cation and nitrate concentrations downstream of operational golf courses. Levels of these parameters and total phosphorus increased over time in several streams during golf course construction through to operation. There was evidence of inputs of mercury to streams on two of the operational courses. Nutrient (phosphorus and nitrogen) concentrations were significantly related to the area of unmanaged vegetation in a 30 x 30 m area on either side of the sampling sites, and to River Bank Quality Index scores, suggesting that maintaining vegetated buffers along the stream on golf courses will reduce in-stream nutrient concentrations. - Golf course construction and operation had a significant impact on alkalinity, nitrogen and base cation concentrations of streams

  19. The ATLAS trigger: high-level trigger commissioning and operation during early data taking

    International Nuclear Information System (INIS)

    Goncalo, R

    2008-01-01

    The ATLAS experiment is one of the two general-purpose experiments due to start operation soon at the Large Hadron Collider (LHC). The LHC will collide protons at a centre of mass energy of 14 TeV, with a bunch-crossing rate of 40 MHz. The ATLAS three-level trigger will reduce this input rate to match the foreseen offline storage capability of 100-200 Hz. This paper gives an overview of the ATLAS High Level Trigger focusing on the system design and its innovative features. We then present the ATLAS trigger strategy for the initial phase of LHC exploitation. Finally, we report on the valuable experience acquired through in-situ commissioning of the system where simulated events were used to exercise the trigger chain. In particular we show critical quantities such as event processing times, measured in a large-scale HLT farm using a complex trigger menu

  20. 46 CFR 504.9 - Information required by the Commission.

    Science.gov (United States)

    2010-10-01

    ... a complaint, protest, petition or agreement requesting Commission action shall submit, no later than... operator, or any officer, agent or employee thereof, as well as all parties to proceedings before the Commission, to submit, within ten (10) days of such request, all material information necessary to comply...

  1. PIP-II Injector Test’s Low Energy Beam Transport: Commissioning and Selected Measurements

    Energy Technology Data Exchange (ETDEWEB)

    Shemyakin, A. [Fermilab; Alvarez, M. [Fermilab; Andrews, R. [Fermilab; Carneiro, J.-P. [Fermilab; Chen, A. [Fermilab; Hanna, B. [Fermilab; Prost, L. [Fermilab; Scarpine, V. [Fermilab; D' Arcy, R. [University Coll. London; Wiesner, C. [Goethe U., Frankfurt (main)

    2016-09-16

    The PIP2IT test accelerator is under construction at Fermilab. Its ion source and Low Energy Beam Transport (LEBT) in its initial (straight) configuration have been commissioned to full specification parameters. This paper introduces the LEBT design and summarizes the outcome of the commissioning activities.

  2. Assessment of the impact of nuclear power plant construction and operation on small regions

    International Nuclear Information System (INIS)

    Johnson, M.H. Jr.

    1977-01-01

    This study addresses the problem of the comprehensive, quantitative evaluation of the environmental, economic, and social impacts of the construction and operation of nuclear power plant on a given region. A theoretical model of the regional impacts is constructed employing input-output methods that are extended to include ecologic as well as economic effects. Thus, the regional model explicitly incorporates environmental feedback as a consequence of economic activity. The model is then employed to estimate the impact of the construction and operation of a nuclear power facility on a small region in South Carolina. Measures of economic and environmental effects include estimates of changes in output, income, employment, local government revenue and expenditure, external costs of environmental decay, pollution loads, and common-property resource usage. Results indicate that, in the South Carolina case study, significant gains in social welfare accrued to the region due to the construction and operation of the nuclear power facility. Further, the theoretical method developed herein provides a comprehensive method of objectively assessing various types of impacts on a region as small as several contiguous counties or even a single county

  3. International co-operation in safety matters within the framework of the Commission of the European Communities

    International Nuclear Information System (INIS)

    Vinck, W.; Balz, W.; Essler, W.; Tolley, B.; Gabolde, J.

    1981-01-01

    European Community (EC) countries realize that their energy demand cannot be met without a nuclear component, which is almost a necessity owing to its major economic advantages. Two typical areas where the Commission has stimulated intense international co-operation are as follows: The first broad area deals with efforts towards a gradual harmonization of regulatory health and safety practices and requirements for reactors of an industrially developed type, more specifically (light) water-cooled reactors. The second area concerns joint research programmes and co-ordination activities in research on nuclear safety (LWRs and LMFBRs). These two broad areas are closely interconnected. Information is also given on the existing network of bilateral and multilateral arrangements for the exchange of information of interest to the EC. In conclusion, some problems are highlighted where improvements could be made or where it seems crucial that increased international co-operation and especially agreement should come about. (author)

  4. Submicron particle monitoring of paving and related road construction operations.

    Science.gov (United States)

    Freund, Alice; Zuckerman, Norman; Baum, Lisa; Milek, Debra

    2012-01-01

    This study identified activities and sources that contribute to ultrafine and other submicron particle exposure that could trigger respiratory symptoms in highway repair workers. Submicron particle monitoring was conducted for paving, milling, and pothole repair operations in a major metropolitan area where several highway repair workers were identified as symptomatic for respiratory illness following exposures at the 2001 World Trade Center disaster site. Exposure assessments were conducted for eight trades involved in road construction using a TSI P-Trak portable condensation particle counter. Direct readings near the workers' breathing zones and observations of activities and potential sources were logged on 7 days on 27 workers using four different models of pavers and two types of millers. Average worker exposure levels ranged from 2 to 3 times background during paving and from 1 to 4 times background during milling. During asphalt paving, average personal exposures to submicron particulates were 25,000-60,000, 28,000-70,000, and 23,000-37,000 particles/ cm(3) for paver operators, screed operators, and rakers, respectively. Average personal exposures during milling were 19,000-111,000, 28,000-81,000, and 19,000 particles/cm(3) for the large miller operators, miller screed operators, and raker, respectively. Personal peak exposures were measured up to 467,000 and 455,000 particles/cm(3) in paving and milling, respectively. Several sources of submicron particles were identified. These included the diesel and electric fired screed heaters; engine exhaust from diesel powered construction vehicles passing by or idling; raking, dumping, and paving of asphalt; exhaust from the hotbox heater; pavement dust or fumes from milling operations, especially when the large miller started and stopped; and secondhand cigarette smoke. To reduce the potential for health effects in workers, over 40 recommendations were made to control exposures, including improved maintenance of

  5. Scenario development during commissioning operations on the National Spherical Torus Experiment Upgrade

    Science.gov (United States)

    Battaglia, D. J.; Boyer, M. D.; Gerhardt, S.; Mueller, D.; Myers, C. E.; Guttenfelder, W.; Menard, J. E.; Sabbagh, S. A.; Scotti, F.; Bedoya, F.; Bell, R. E.; Berkery, J. W.; Diallo, A.; Ferraro, N.; Kaye, S. M.; Jaworski, M. A.; LeBlanc, B. P.; Ono, M.; Park, J.-K.; Podesta, M.; Raman, R.; Soukhanovskii, V.; NSTX-U Research, the; Operations; Engineering Team

    2018-04-01

    The National Spherical Torus Experiment Upgrade (NSTX-U) will advance the physics basis required for achieving steady-state, high-beta, and high-confinement conditions in a tokamak by accessing high toroidal fields (1 T) and plasma currents (1.0-2.0 MA) in a low aspect ratio geometry (A  =  1.6-1.8) with flexible auxiliary heating systems (12 MW NBI, 6 MW HHFW). This paper describes the progress in the development of L- and H-mode discharge scenarios and the commissioning of operational tools in the first ten weeks of operation that enable the scientific mission of NSTX-U. Vacuum field calculations completed prior to operations supported the rapid development and optimization of inductive breakdown at different values of ohmic solenoid current. The toroidal magnetic field (B T0  =  0.65 T) exceeded the maximum values achieved on NSTX and novel long-pulse L-mode discharges with regular sawtooth activity exceeded the longest pulses produced on NSTX (t pulse  >  1.8 s). The increased flux of the central solenoid facilitated the development of stationary L-mode discharges over a range of density and plasma current (I p). H-mode discharges achieved similar levels of stored energy, confinement (H98y,2  >  1) and stability (β N/β N-nowall  >  1) compared to NSTX discharges for I p  ⩽  1 MA. High-performance H-mode scenarios require an L-H transition early in the I p ramp-up phase in order to obtain low internal inductance (l i) throughout the discharge, which is conducive to maintaining vertical stability at high elongation (κ  >  2.2) and achieving long periods of MHD quiescent operations. The rapid progress in developing L- and H-mode scenarios in support of the scientific program was enabled by advances in real-time plasma control, efficient error field identification and correction, effective conditioning of the graphite wall and excellent diagnostic availability.

  6. Evolution of RFID Applications in Construction: A Literature Review

    Science.gov (United States)

    Valero, Enrique; Adán, Antonio; Cerrada, Carlos

    2015-01-01

    Radio frequency identification (RFID) technology has been widely used in the field of construction during the last two decades. Basically, RFID facilitates the control on a wide variety of processes in different stages of the lifecycle of a building, from its conception to its inhabitance. The main objective of this paper is to present a review of RFID applications in the construction industry, pointing out the existing developments, limitations and gaps. The paper presents the establishment of the RFID technology in four main stages of the lifecycle of a facility: planning and design, construction and commission and operation and maintenance. Concerning this last stage, an RFID application aiming to facilitate the identification of pieces of furniture in scanned inhabited environments is presented. Conclusions and future advances are presented at the end of the paper. PMID:26151210

  7. Mechanic- and hydraulic shock-absorbers - layout, construction, operation experience

    International Nuclear Information System (INIS)

    Kluge, M.

    1981-01-01

    The problem lies in the protection of the flexible supported power plant components against undesired sudden movements. Various shock absorbing systems are at disposal in this case: Mechanical and hydraulic shock absorbers, whose functioning systems are shown in figures. The operation experience showed a series of deficiencies, as demonstrated on various figures. In order to avoid them, some important recommendations are given. Requirements and layout are demonstrated according to todays' state-of-the-art. The admissible stresses, resulting from the summary of various specifications for the analytical evidence will be described. Development and construction will be explained in detail by means of pictures with cross sections of original shock absorbers. Todays' construction characteristics will be summarized. The final remark includes a request for generally valid guidelines. (orig.) [de

  8. The preparation and implementation of the commissioning of Qinshan nuclear power plant

    International Nuclear Information System (INIS)

    Huang Jinyuan

    1993-05-01

    The commissioning test of Qinshan Nuclear Power Plant is summarized. The preparation stage includes the organizations, commissioning programme, network planning, commissioning items, management procedures, responsibilities and interfaces between divisions, products ordering and supplying, personal training, quality assurance and the review and supervision by National Nuclear Safety Administration etc. The implementation stage includes the commissioning programme planning, intermediate hand-over inspection of the system and equipment, inspecting conditions and setting organizations for commissioning, the transition from commissioning to operating. Finally, some experiences in the commissioning test are presented in the article

  9. Explicit construction of quasiconserved local operator of translationally invariant nonintegrable quantum spin chain in prethermalization

    Science.gov (United States)

    Lin, Cheng-Ju; Motrunich, Olexei I.

    2017-12-01

    We numerically construct translationally invariant quasiconserved operators with maximum range M , which best commute with a nonintegrable quantum spin chain Hamiltonian, up to M =12 . In the large coupling limit, we find that the residual norm of the commutator of the quasiconserved operator decays exponentially with its maximum range M at small M , and turns into a slower decay at larger M . This quasiconserved operator can be understood as a dressed total "spin-z " operator, by comparing with the perturbative Schrieffer-Wolff construction developed to high order reaching essentially the same maximum range. We also examine the operator inverse participation ratio of the operator, which suggests its localization in the operator Hilbert space. The operator also shows an almost exponentially decaying profile at short distance, while the long-distance behavior is not clear due to limitations of our numerical calculation. Further dynamical simulation confirms that the prethermalization-equilibrated values are described by a generalized Gibbs ensemble that includes such quasiconserved operator.

  10. Safety evaluation report related to the construction permit and operating license for the research reactor at the University of Texas (Docket No. 50-602)

    International Nuclear Information System (INIS)

    1992-01-01

    The Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC) has prepared Supplement 1 to NUREG-1135, ''Safety Evaluation Report Related to the Construction Permit and Operating License for the Research Reactor at the University of Texas'' (SER) May 1985. The reactor facility is owned by The University of Texas at Austin (UT, the applicant) and is located at the University's Balcones Research Center in Austin, Texas. This supplement to the SER (SSER) describes the changes to the reactor facility design from the description in the SER. The SER and SSER together reflect the facility as built. The SSER also documents the reviews that the NRC has completed regarding the applicant's emergency plan, security plan, and technical specifications that were identified as open in the SER

  11. The Kemeny commission report. Comments by UKAEA

    International Nuclear Information System (INIS)

    1979-01-01

    The report of the President's Commission - the Kemeny Report - on the accident at Three Mile island has been considered by the UKAEA and the implications of the Commission's findings and recommendations for the United Kingdom examined. The contents of the report have been studied not only generally but also for each site and especially with respect to plant instrumentation, operator training, emergency arrangements and communications. The Authority believes that there are no major deficiencies but is fully aware of the crucial importance of continuing to exercise all possible care and ensuring that each detailed point arising from the Kemeny Commission's Report is given careful thought. (U.K.)

  12. AECL's participation in the commissioning of Point Lepreau generating station unit 1

    International Nuclear Information System (INIS)

    Chawla, S.; Singh, K.; Yerramilli, S.

    1983-05-01

    Support from Atomic Energy of Canada Ltd. (AECL) to Point Lepreau during the commissioning program has been in the form of: seconded staff for commissioning program management, preparation of commissioning procedures, and hands-on commissioning of several systems; analysis of test results; engineering service for problem solving and modifications; design engineering for changes and additions; procurement of urgently-needed parts and materials; technological advice; review of operational limits; interpretation of design manuals and assistance with and preparation of submissions to regulatory authorities; and development of equipment and procedures for inspection and repairs. This, together with AECL's experience in the commissioning of other 600 MWe stations, Douglas Point and Ontario Hydro stations, provides AECL with a wide range of expertise for providing operating station support services for CANDU stations

  13. Temelin-1 reactor unit commissioning and start-up

    International Nuclear Information System (INIS)

    Palecek, K.

    2002-01-01

    The Temelin-1 commissioning process was affected substantially by the change in the Czech political situation in 1989. The effects thereof were both favourable and unfavourable. Among favourable effects are the replacement of the original Instrumentation and Control System by a more advanced system and design changes which have brought about additional improvement of the Temelin NPP design safety, although on the other hand, this had an adverse impact on the time span and price of the power plant construction. Additional adverse effects included an unstable political and economic situation, associated with frequent changes in the management of the utility CEZ, a.s. (owner of the plant) as well as frequent replacement of persons in the position of the managing director of the Temelin plant itself. Despite all the difficulties encountered, Temelin-1 reactor unit could be ultimately put into trial operation in June 2002. (author)

  14. Construction and operation of biogas plants. Bau und Betrieb von Biogasanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Koenig, F. von

    1985-01-01

    Biogas utilisation in agriculture has increased considerably as a consequence of the energy crisis. So far, energy production was the most important aspect, and the high-quality natural fertilizer offered by the fermentation residues was commonly neglected. This fertilizer is an effective substitute for commercial fertilizers and thus contributes to the reduction of environmental pollution. The book discusses the chemical and biological mechanisms, the criteria of selection for plants and materials, optimum gas production techniques, uses of the product gas, and the advantages and properties of the biofertilizer produced. Planning procedures, design, construction, function and performance of several biogas production plants now in operation are described. Hints are given for do-it-yourself construction, as are cost-benefit calculations and decision aids for construction.

  15. Commissioning activities of CMS Drift Tubes (DT) chambers at SX5

    CERN Multimedia

    Domenico Dattola

    2005-01-01

    After DT and RPC packages have been installed, and before their cabling, single chamber commissioning takes place. It consists of a series of performance test on the on-chamber minicrates, containing readout and trigger electronics, as well as high voltage tests and cosmic data taking. The pictures show the preparation activities for the chamber commissioning in the construction hall in Cessy (neighbouring France), called SX5.

  16. Danish Atomic Energy Commission 1974/75

    International Nuclear Information System (INIS)

    1975-11-01

    Activities of the Danish Atomic Energy Commission and the Risoe eesearch Establishment for the period April1, 1974 to March 31, 1975 are summarized. The operations of the various facilities at the Research Establishment are revised. Operating staff levels and financial data are tabulated, a selected list of staff publications is given, and the design data on research facilities are presented. (B.P.)

  17. 75 FR 55631 - U. S. Rail Corporation-Construction and Operation Exemption-Brookhaven Rail Terminal

    Science.gov (United States)

    2010-09-13

    ... the proposed construction is to enable U. S. Rail to serve the BRT as a common carrier and to deliver... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35141] U. S. Rail Corporation--Construction and Operation Exemption-- Brookhaven Rail Terminal AGENCY: Surface Transportation...

  18. Pond systems for the purification and disposal of domestic wastewater from small communities: use, design, operation and maintenance

    CSIR Research Space (South Africa)

    Drews, RJLC

    1983-01-01

    Full Text Available Pond systems are ideally suited for small communities, and for schools, hospitals and other institutions since they are simple and economical to construct, operate and maintain. Numerous pons systems have been designed and commissioned in South...

  19. Changing priorities of codes and standards -- quality engineering: Experiences in plant construction, maintenance, and operation

    International Nuclear Information System (INIS)

    Antony, D.D.; Suleski, P.F.; Meier, J.C.

    1994-01-01

    Application of the ASME Code across various fossil and nuclear plants necessitates a Company approach adapted by unique status of each plant. This arises from State Statutes, Federal Regulations and consideration of each plant's as-built history over a broad time frame of design, construction and operation. Additionally, the National Board Inspection Code accompanies Minnesota Statutes for plants owned by Northern States Power Company. This paper addresses some key points on NSP's use of ASME Code as a principal mechanical standard in plant design, construction and operation. A primary resource facilitating review of Code provisions is accurate status on current plant configuration. As plant design changes arise, the Code Edition/Addenda of original construction and installed upgrades or replacements are considered against available options allowed by current standards and dialog with the Jurisdictional Authority. Consistent with the overall goal of safe and reliable plant operation, there are numerous Code details and future needs to be addressed in concert with expected plant economics and planned outages for implementation. The discussion begins in the late 60's with new construction of Monticello and Prairie Island (both nuclear), through Sherburne County Units 1 through 3 (fossil), and their changes, replacements or repairs as operating plants

  20. Does modern helicopter construction reduce noise exposure in helicopter rescue operations?

    Science.gov (United States)

    Küpper, Thomas; Jansing, Paul; Schöffl, Volker; van Der Giet, Simone

    2013-01-01

    During helicopter rescue operations the medical personnel are at high risk for hearing damage by noise exposure. There are two important factors to be taken into account: first, the extreme variability, with some days involving no exposure but other days with extreme exposure; second, the extreme noise levels during work outside the helicopter, e.g. during winch operations. The benefit of modern, less noisier constructions and the consequences for noise protection are still unknown. We estimated the noise exposure of the personnel for different helicopter types used during rescue operations in the Alps and in other regions of the world with special regard to the advanced types like Eurocopter EC 135 to compare the benefit of modern constructions for noise protection with earlier ones. The rescue operations over 1 year of four rescue bases in the Alps (Raron and Zermatt in Switzerland; Landeck and Innsbruck in Austria, n = 2731) were analyzed for duration of rescue operations (noise exposure). Noise levels were measured during rescue operations at defined points inside and outside the different aircraft. The setting is according to the European standard (Richtlinie 2003/10/EG Amtsblatt) and to Class 1 DIN/IEC 651. With both data sets the equivalent noise level L(eq8h) was calculated. For comparison it was assumed that all rescue operations were performed with a specific type of helicopter. Then model calculations for noise exposure by different helicopter types, such as Alouette IIIb, Alouette II 'Lama', Ecureuil AS350, Bell UH1D, Eurocopter EC135, and others were performed. Depending on modern technologies the situation for the personnel has been improved significantly. Nevertheless noise prevention, which includes noise intermissions in spare time, is essential. Medical checks of the crews by occupational medicine (e.g. 'G20' in Germany) are still mandatory.

  1. PLEIADES-HR IMAGE QUALITY COMMISSIONING

    Directory of Open Access Journals (Sweden)

    L. Lebègue

    2012-07-01

    Full Text Available PLEIADES is the highest resolution civilian earth observing system ever developed in Europe. This imagery program is conducted by the French National Space Agency, CNES. It operates since 2012 a first satellite PLEIADES-HR launched on 2011 December 17th, a second one should be launched by the end of the year. Each satellite is designed to provide optical 70 cm resolution coloured images to civilian and defence users. The Image Quality requirements were defined from users studies from the different spatial imaging applications, taking into account the trade-off between on-board technological complexity and ground processing capacity. The assessment of the image quality and the calibration operation have been performed by CNES Image Quality team during the 6 month commissioning phase that followed the satellite launch. These activities cover many topics gathered in two families : radiometric and geometric image quality. The new capabilities offered by PLEIADES-HR agility allowed to imagine new methods of image calibration and performance assessment. Starting from an overview of the satellite characteristics, this paper presents all the calibration operations that were conducted during the commissioning phase and also gives the main results for every image quality performance.

  2. 18 CFR 401.124 - Construction.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Construction. 401.124 Section 401.124 Conservation of Power and Water Resources DELAWARE RIVER BASIN COMMISSION ADMINISTRATIVE MANUAL RULES OF PRACTICE AND PROCEDURE General Provisions § 401.124 Construction. This part is...

  3. Surface facilities for geological deep repositories - Measures against dangers during construction and operation

    International Nuclear Information System (INIS)

    2013-09-01

    This brochure published by the Swiss National Cooperative for the Disposal of Radioactive Waste (NAGRA) discusses the measures that are to be taken to address the dangers encountered during the construction and operation of deep geological repositories for nuclear wastes. Firstly, the operation of such repositories during the emplacement of nuclear wastes is discussed and examples of possible repositories for fuel rods and highly-radioactive waste are presented. Various emission-protection issues and safety measures to be taken during construction of such repositories are looked at as is the protection of ground water. Safety considerations during the operational phase are discussed, including inclusion methods used for the wastes and radiation protection. The handling of radioactive wastes, the recognition of dangers and measures to be taken to counteract them are discussed. Various possible accidents are looked at

  4. Commissioning and startup of the Blind River uranium refinery

    International Nuclear Information System (INIS)

    Schisler, J.M.

    1987-01-01

    In the last five years Eldorado Resources Ltd. (ERL) has undergone a major expansion and modernization of its uranium refining and conversion plants. A new refinery for processing yellow cake to UO/sub 3/ was constructed at Blind River in northern Ontario and started up in 1983. Its rated capacity is 18,000 t/a uranium as UO/sub 3/. At Port Hope, Ontario, ERL's new UF/sub 6/ conversion plant has been constructed. This plant started up in 1984. It utilizes the novel, wet-way process to produce UF/sub 4/ and gives the company a UF/sub 6/ production capacity of 14,500 t/a U. Also at Port Hope is Eldorado's ceramic UO/sub 2/ powder production facility, commissioned in late 1980. It has a capacity of 1700 t/a uranium as UO/sub 2/. With the completion of these capital projects, Eldorado has the largest and most up-to-date refining and conversion facilities in the western world. This paper reviews the refining process and process design. The methodology used to start up the Blind River plant is described as are some startup difficulties, solutions that were developed, and the resultant current operation

  5. Regulatory view on licensing and commissioning of Temelin NPP

    International Nuclear Information System (INIS)

    Drabova, D.; Boehm, K.; Brandejs, P.; Tipek, Z.

    2004-01-01

    The competencies delegated to the Czech State Office for Nuclear Safety by Czech legislation are highlighted and the history of construction and commissioning of the Temelin nuclear power plant in relation to the licensing process is described. (P.A.)

  6. Building Commissioning: A Golden Opportunity for Reducing Energy Costs and Greenhouse-gas Emissions

    Energy Technology Data Exchange (ETDEWEB)

    Mills, Evan

    2009-07-16

    The aim of commissioning new buildings is to ensure that they deliver, if not exceed, the performance and energy savings promised by their design. When applied to existing buildings, commissioning identifies the almost inevitable 'drift' from where things should be and puts the building back on course. In both contexts, commissioning is a systematic, forensic approach to quality assurance, rather than a technology per se. Although commissioning has earned increased recognition in recent years - even a toehold in Wikipedia - it remains an enigmatic practice whose visibility severely lags its potential. Over the past decade, Lawrence Berkeley National Laboratory has built the world's largest compilation and meta-analysis of commissioning experience in commercial buildings. Since our last report (Mills et al. 2004) the database has grown from 224 to 643 buildings (all located in the United States, and spanning 26 states), from 30 to 100 million square feet of floorspace, and from $17 million to $43 million in commissioning expenditures. The recorded cases of new-construction commissioning took place in buildings representing $2.2 billion in total construction costs (up from 1.5 billion). The work of many more commissioning providers (18 versus 37) is represented in this study, as is more evidence of energy and peak-power savings as well as cost-effectiveness. We now translate these impacts into avoided greenhouse gases and provide new indicators of cost-effectiveness. We also draw attention to the specific challenges and opportunities for high-tech facilities such as labs, cleanrooms, data centers, and healthcare facilities. The results are compelling. We developed an array of benchmarks for characterizing project performance and cost-effectiveness. The median normalized cost to deliver commissioning was $0.30/ft2 for existing buildings and $1.16/ft2 for new construction (or 0.4% of the overall construction cost). The commissioning projects for which

  7. Fuel handling at Cernavoda 1 N.P.S. - commissioning and training philosophy

    Energy Technology Data Exchange (ETDEWEB)

    Standen, G W [AECL-Ansaldo Consortium, Cernavoda (Romania); Tiron, C; Marinescu, S [Regia Nationala de Electricitate (RENEL), Cernavoda (Romania); [Filiala Centrala Nuclearo Electrica (FCNE), Cernavoda (Romania)

    1997-12-31

    Efficient operation of a Candu nuclear power plant depends greatly on the reliable and safe operation of the fuel handling system. Successful commissioning of the system is obviously a key aspect of the reliability of the system and this coupled with a rigorous training programme for the fuel handling staff will ensure the system`s safe operation. This paper describes the philosophy used at Cernavoda 1 N.P.S. for the commissioning of the fuel handling systems and for the training of staff for operation and maintenance of these systems. The paper also reviews the commissioning programme, describing the milestones achieved and discussing some of the more interesting technical aspects which includes some unique Romanian input. In conclusion the paper looks at the organization of the mature fuel handling department from the operations, maintenance and technical support points of view and the long term plans for the future. (author). 1 fig.

  8. Fuel handling at Cernavoda 1 N.P.S. - commissioning and training philosophy

    International Nuclear Information System (INIS)

    Standen, G.W.; Tiron, C.; Marinescu, S.

    1996-01-01

    Efficient operation of a Candu nuclear power plant depends greatly on the reliable and safe operation of the fuel handling system. Successful commissioning of the system is obviously a key aspect of the reliability of the system and this coupled with a rigorous training programme for the fuel handling staff will ensure the system's safe operation. This paper describes the philosophy used at Cernavoda 1 N.P.S. for the commissioning of the fuel handling systems and for the training of staff for operation and maintenance of these systems. The paper also reviews the commissioning programme, describing the milestones achieved and discussing some of the more interesting technical aspects which includes some unique Romanian input. In conclusion the paper looks at the organization of the mature fuel handling department from the operations, maintenance and technical support points of view and the long term plans for the future. (author). 1 fig

  9. State Energy Commission of Western Australia. 1985 annual report

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    The report reviews the operations and achievements of the Commission during 1984/85, and also outlines plans aimed at providing reliable and cost-effective energy supplies in Western Australia in the future. The Commission completed the 1984/85 financial year with an operating surplus of 4.3 m dollars. This compared with a surplus of 4.4 m dollars for the previous year. A full set of financial statements, certified by the Auditor General of Western Australia as being properly drawn up and fairly presented, appears in the back of the report.

  10. A physiological exploration on operational stance and occupational musculoskeletal problem manifestations amongst construction labourers of West Bengal, India.

    Science.gov (United States)

    Chatterjee, Arijit; Sahu, Subhashis

    2018-03-29

    A huge number of labourers engaged in construction industry in India both in organized and unorganized sectors. The construction labourers most often work for an extended period of time and they are compelled to uphold altered static and dynamic operational stance in awkward positions during the complete period of work which raises the demand on the musculoskeletal system and may lead to work related musculoskeletal disorders (WRMSDs). This study is intended to explore the operational stance and occupation related musculoskeletal manifestations amongst the construction labourers. One sixty four male labourers from different construction sites of West Bengal was randomly taken for this study. A modified Nordic questionnaire on MSD and the 12 item General Health Questionnaire (GHQ12) were administered on the construction labourers. Rapid Entire Body Assessment [REBA] and Ovako Work Analysis System [OWAS] methods were applied to analyze the operational stance. Finally, discomfort levels of the specific operational stance were calculated by the use of risk level and BPD scale. From the study it was revealed that most of the construction labourers habitually in awkward operational stance and were affected by altering musculoskeletal manifestations like pain in low back, neck, and wrist. It has been also found that there is a significant (pconstruction labourers in unorganized sectors.

  11. Alberta Petroleum Marketing Commission annual report, 1993

    International Nuclear Information System (INIS)

    1994-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1993 marked the last full year of the Commission operating as Alberta's representative in the energy regulatory arena in Canada and the USA; due to restructuring, these functions will be transferred to the Ministry of Energy in early 1994. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 40.2 million bbl, down 11% from 1992, and receipts of heavy crude were 3.7 million bbl, down 42% from 1992. Revenue from crude oil sales was $800 million, down 25% from 1992. The Commission's natural gas activities in 1993 included price determination and information collection. 4 figs., 3 tabs

  12. Nuclear Regulatory Commission Information Digest: 1993 edition

    International Nuclear Information System (INIS)

    1993-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the U.S. Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1992, with exceptions noted. Information on generating capacity and average capacity factor for operating U.S. commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed. Comments and/or suggestions on the data presented are welcomed and should be directed to Karen Olive, United States Nuclear Regulatory Commission, Office of the Controller, Division of Budget and Analysis, Washington, D.C. 20555. For detailed and complete information about tables and figures, refer to the source publications

  13. Commissioning experiences on high voltage generator of 750 KeV DC accelerator at RRCAT, Indore

    International Nuclear Information System (INIS)

    Banwari, R.; Kasliwal, A.; Pandit, T.G.

    2009-01-01

    Design approach of high voltage generator for 750 keV DC accelerator, developed at RRCAT Indore, inculcates a unique feature of high frequency operation of symmetrical Cockcroft-Walton voltage generator. Apart from design simplicity and feasibility of modular construction, the high frequency use of symmetrical Cockcroft-Walton circuit gives added advantages of less ripple, better regulation, faster response and low stored energy in the system. Additionally the scheme allows us the use of low voltage, light weight components thus improving the overall economy of the system. The accelerator has been commissioned and made operational at its rated energy of 750 keV in the recent past. With brief introduction on design aspects of high voltage generator and filament power supply of this accelerator, the paper presented here describes the developmental steps of various components with focus on challenges encountered and solutions implemented. Development of high frequency inverter, high voltage ferrite core transformer, compensating inductors, interface bushings, voltage multiplier stack, and filament transformer along with floating power supply for electron emitter of the accelerator has been dealt in detail. The failures encountered during commissioning stages of the accelerator have been reported with measures taken for improvement of the specific components. Intricacies of the reflected capacitance of the multiplier stack and arc-current ground return are also described with their effects on system operation and reliability. (author)

  14. CEBAF SRF Performance during Initial 12 GeV Commissioning

    International Nuclear Information System (INIS)

    Bachimanchi, Ramakrishna; Allison, Trent; Daly, Edward; Drury, Michael; Hovater, J; Lahti, George; Mounts, Clyde; Nelson, Richard; Plawski, Tomasz

    2015-09-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of eleven new 100 MV cryomodules (88 cavities). The superconducting RF cavities are designed to operate CW at an accelerating gradient of 19.3 MV/m with a Q L of 3x10 7 . Not all the cavities were operated at the minimum gradient of 19.3 MV/m with the beam. Though the initial 12 GeV milestones were achieved during the initial commissioning of CEBAF, there are still some issues to be addressed for long term reliable operation of these modules. This paper reports the operational experiences during the initial commissioning and the path forward to improve the performance of C100 (100 MV) modules.

  15. Monitoring-based HVAC commissioning of an existing office building for energy efficiency

    International Nuclear Information System (INIS)

    Wang, Liping; Greenberg, Steve; Fiegel, John; Rubalcava, Alma; Earni, Shankar; Pang, Xiufeng; Yin, Rongxin; Woodworth, Spencer; Hernandez-Maldonado, Jorge

    2013-01-01

    Highlights: ► Demonstrated monitoring-based HVAC commissioning using an existing office building. ► Diagnosed various types of faulty operation in the HVAC system by trend data analyses. ► Identified a list of energy saving measures for the HVAC system. ► Quantified energy saving potential for each commissioning measure using calibrated energy simulation model. ► Achieved an actual energy saving of 10% after the implementations of cost-effective measures. -- Abstract: The performance of Heating, Ventilation and Air Conditioning (HVAC) systems may fail to satisfy design expectations due to improper equipment installation, equipment degradation, sensor failures, or incorrect control sequences. Commissioning identifies and implements cost-effective operational and maintenance measures in buildings to bring them up to the design intent or optimum operation. An existing office building is used as a case study to demonstrate the process of commissioning. Building energy benchmarking tools are applied to evaluate the energy performance for screening opportunities at the whole building level. A large natural gas saving potential was indicated by the building benchmarking results. Faulty operations in the HVAC systems, such as improper operations of air-side economizers, simultaneous heating and cooling, and ineffective optimal start, were identified through trend data analyses and functional testing. The energy saving potential for each commissioning measure is quantified with a calibrated building simulation model. An actual energy saving of 10% was realized after the implementations of cost-effective measures.

  16. The primary ion source for construction and optimization of operation parameters

    International Nuclear Information System (INIS)

    Synowiecki, A.; Gazda, E.

    1986-01-01

    The construction of primary ion source for SIMS has been presented. The influence of individual operation parameters on the properties of ion source has been investigated. Optimization of these parameters has allowed to appreciate usefulness of the ion source for SIMS study. 14 refs., 8 figs., 2 tabs. (author)

  17. Nuclear Regulatory Commission Information Digest 1992 edition

    International Nuclear Information System (INIS)

    Olive, K.

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed

  18. Information management system for design, construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bolch, M.C.; Jones, C.R.

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software

  19. Information management system for design, construction and operation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bolch, M.C. (Duke Power Co. (US)); Jones, C.R. (S. Levy Inc. (US))

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software.

  20. Construction techniques and operation principles of Geiger-Mueller counters using external cathode (Mazetype)

    International Nuclear Information System (INIS)

    Sevegnani, F.X.

    1988-01-01

    The construction techniques for external cathode (Maze) and internal cathode Geiger-Muller counters are described, showing the operation principles and the used material nature. More than 200 counter types were evaluated analysing their characteristics. The influence of several types of guard-rings was studied, for optimizing counter operation conditions. Plateaus of the order of 700 V with slope of 0,3%/100 V for the net counting rate, and 1400 V with a slope of 0,8/100 V for total counts using total pressure of 10 cmHg, were obtained. A counter for β detection, using blown glass window in one of the edges of the cylinder was constructed. Counters of long life using materials such as, mica, adhesive glues, etc., were obtained. The results shown that the best counter operation occurs when it is empty in a vacuum of 10 -5 mmHg. (M.C.K.) [pt

  1. The business and technical case for Continuous Commissioning(reg Trade Mark) for enhanced building operations. A case study: Alamo Community College District San Antonio, Texas, U.S.A

    Energy Technology Data Exchange (ETDEWEB)

    Verdict, Malcolm; Wei, Guanghua [Texas A and M Univ. System, College Station, TX (United States). Energy Systems Laboratory

    2005-07-01

    This paper provides both the business and technical cases for the 'Continuous Commissioning' of large [>25,000 square feet], buildings through a whole building diagnostic and HVAC optimization approach known as 'Continuous Commissioning'. 'Continuous Commissioning' is defined as the ongoing engineering process to resolve operating problems, improve comfort, optimize energy use and identify retrofits in existing buildings and central plant facilities. It is also known as 'building retro-commissioning' or 'building tune-up'. It involves a rigorous, whole-building, engineering evaluation of the heating and cooling systems to identify mechanical problems, inadequate or ineffective control strategies. Some of the most common problems are: 1) Improper calibration of sensors and metering, 2) inadequate control strategies for optimum operation and comfort, 3) incorrect scheduling of heating and cooling equipment, 4) lack of air and water-side economizer equipment, 5) inadequate building automation systems, and 6) inadequate operations and maintenance. The CC process, described in this paper, was successfully applied at Alamo Community College District (ACCD) in San Antonio, Texas, USA by the Energy Systems Laboratory (ESL), a part of the Texas A and M Univ. System. ACCD has multiple buildings on 4 campuses with total conditioned area of 2.35 Million square feet. ACCD's business approach was unique because the cost of conducting the CC process was financed as an Energy Cost Reduction Measure (ECRM) along with several energy efficiency retrofits.

  2. German battlecruisers of world war one their design, construction and operations

    CERN Document Server

    Staff, Gary

    2015-01-01

    This is the most comprehensive study yet in the English language of the German Imperial Navy's battlecruisers that served in the First World War. Known as Panzerkreuzer, literally 'armoured cruiser', the eight ships of the class were to be involved in several early North Sea skirmishes before the great pitched battle of Jutland where they inflicted devastating damage on the Royal Navy's battlecruiser fleet.
In this new book the author details their design and construction, and traces the full service history of each ship, recounting their actions, largely from first-hand German sources and official documents, many previously unpublished in English. Detailed line drawings and maps augment the text throughout, as do a wealth of contemporary photos that depict the vessels at sea as well as in dock, where details of damage sustained in action and many aspects of their design can be viewed in close up. A superb series of full-colour, specially-commissioned computer graphics show full length profiles and top-down...

  3. High voltage power network construction

    CERN Document Server

    Harker, Keith

    2018-01-01

    This book examines the key requirements, considerations, complexities and constraints relevant to the task of high voltage power network construction, from design, finance, contracts and project management to installation and commissioning, with the aim of providing an overview of the holistic end to end construction task in a single volume.

  4. The ALICE Transition Radiation Detector: construction, operation, and performance

    OpenAIRE

    Acharya, Shreyasi; Adam, Jaroslav; Ahmad, Nazeer; Bhattacharjee, Buddhadeb; Turrisi, Rosario; Tveter, Trine Spedstad; Ullaland, Kjetil; Umaka, Ejiro Naomi; Uras, Antonio; Usai, Gianluca; Utrobicic, Antonija; Vala, Martin; Van Der Maarel, Jasper; Van Hoorne, Jacobus Willem; Bhom, Jihyun

    2018-01-01

    The Transition Radiation Detector (TRD) was designed and built to enhance the capabilities of the ALICE detector at the Large Hadron Collider (LHC). While aimed at providing electron identification and triggering, the TRD also contributes significantly to the track reconstruction and calibration in the central barrel of ALICE. In this paper the design, construction, operation, and performance of this detector are discussed. A pion rejection factor of up to 410 is achieved at a momentum of 1 G...

  5. 78 FR 21245 - Continuity of Operations Plan

    Science.gov (United States)

    2013-04-10

    ...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...

  6. Health physics experience in commissioning and operation of radiation and air activity monitoring system at FBTR

    International Nuclear Information System (INIS)

    Raghunath, V.M.; Meenakshisundaram, V.; Viswanathan, S.; Bala Sundar, S.; Jose, M.T.; Suriyamurthy, N.; Ravi, T.; Subramanian, V.

    2001-01-01

    The Radiation and Air Activity Monitoring System (RAAMS) at Fast Breeder Test Reactor (FBTR) is meant to monitor and record the radiation and air activity levels at various potentially active areas in FBTR complex. Health Physics Group, FBTR was associated during commissioning of RAAMS in fixing the alarm settings for the monitors, their relocation and in formulating the surveillance procedures. The areas were surveyed to check for any release of activity for confirming the observed readings during operation of the reactor. In such cases, augmentation of shielding was recommended and was promptly implemented by the station management. The details of the long and fruitful experience gained by the Health Physics Group, FBTR are described in this paper. (author)

  7. The treatment of commission errors in first generation human reliability analysis methods

    Energy Technology Data Exchange (ETDEWEB)

    Alvarengga, Marco Antonio Bayout; Fonseca, Renato Alves da, E-mail: bayout@cnen.gov.b, E-mail: rfonseca@cnen.gov.b [Comissao Nacional de Energia Nuclear (CNEN) Rio de Janeiro, RJ (Brazil); Melo, Paulo Fernando Frutuoso e, E-mail: frutuoso@nuclear.ufrj.b [Coordenacao dos Programas de Pos-Graduacao de Engenharia (PEN/COPPE/UFRJ), RJ (Brazil). Programa de Engenharia Nuclear

    2011-07-01

    Human errors in human reliability analysis can be classified generically as errors of omission and commission errors. Omission errors are related to the omission of any human action that should have been performed, but does not occur. Errors of commission are those related to human actions that should not be performed, but which in fact are performed. Both involve specific types of cognitive error mechanisms, however, errors of commission are more difficult to model because they are characterized by non-anticipated actions that are performed instead of others that are omitted (omission errors) or are entered into an operational task without being part of the normal sequence of this task. The identification of actions that are not supposed to occur depends on the operational context that will influence or become easy certain unsafe actions of the operator depending on the operational performance of its parameters and variables. The survey of operational contexts and associated unsafe actions is a characteristic of second-generation models, unlike the first generation models. This paper discusses how first generation models can treat errors of commission in the steps of detection, diagnosis, decision-making and implementation, in the human information processing, particularly with the use of THERP tables of errors quantification. (author)

  8. VINCI: the VLT Interferometer commissioning instrument

    Science.gov (United States)

    Kervella, Pierre; Coudé du Foresto, Vincent; Glindemann, Andreas; Hofmann, Reiner

    2000-07-01

    The Very Large Telescope Interferometer (VLTI) is a complex system, made of a large number of separated elements. To prepare an early successful operation, it will require a period of extensive testing and verification to ensure that the many devices involved work properly together, and can produce meaningful data. This paper describes the concept chosen for the VLTI commissioning instrument, LEONARDO da VINCI, and details its functionalities. It is a fiber based two-way beam combiner, associated with an artificial star and an alignment verification unit. The technical commissioning of the VLTI is foreseen as a stepwise process: fringes will first be obtained with the commissioning instrument in an autonomous mode (no other parts of the VLTI involved); then the VLTI telescopes and optical trains will be tested in autocollimation; finally fringes will be observed on the sky.

  9. Indexes to Nuclear Regulatory Commission issuances, July--September 1995. Volume 42, Index 1

    International Nuclear Information System (INIS)

    1995-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  10. Indexes to Nuclear Regulatory Commission issuances, July--December 1994. Volume 40, Index 2

    International Nuclear Information System (INIS)

    1994-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board panel (LBP), the Administrative Law Judges, the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); Type of issuance (memorandum, order, decision, etc.)

  11. Indexes to Nuclear Regulatory Commission issuances: July--September 1994. Volume 40, Index 1

    International Nuclear Information System (INIS)

    1994-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decision (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility), full text reference (volume and pagination), issuance number, issues raised by apellants, legal citations (cases, regulations, and statutes), name of facility, docket number, subject matter of issues and/or rulings, type of hearing (for construction permit, operating license, etc.), type of issuance (Memorandum, order, decision, etc.)

  12. Indexes to Nuclear Regulatory Commission issuances, January--March 1995. Volume 41, Index 1

    International Nuclear Information System (INIS)

    1995-06-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  13. Indexes to Nuclear Regulatory Commission issuances, July--December 1994. Volume 40, Index 2

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board panel (LBP), the Administrative Law Judges, the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); Type of issuance (memorandum, order, decision, etc.).

  14. Indexes to Nuclear Regulatory Commission issuances: July--September 1994. Volume 40, Index 1

    Energy Technology Data Exchange (ETDEWEB)

    1994-12-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors` Decision (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility), full text reference (volume and pagination), issuance number, issues raised by apellants, legal citations (cases, regulations, and statutes), name of facility, docket number, subject matter of issues and/or rulings, type of hearing (for construction permit, operating license, etc.), type of issuance (Memorandum, order, decision, etc.).

  15. Technical data for concentrated solar power plants in operation, under construction and in project

    Directory of Open Access Journals (Sweden)

    Ugo Pelay

    2017-08-01

    Full Text Available This article presents technical data for concentrated solar power (CSP plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.. Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017 [1].

  16. A Neo-Piagetian Theory of Constructive Operators: Applications to Perceptual-Motor Development and Learning.

    Science.gov (United States)

    Todor, John I.

    The author presents an overview of Pascual-Leone's Theory of Constructive Operators, a process-structural theory based upon Piagetian constructs which has evolved to both explain and predict the temporal unfolding of behavior. An application is made of the theory to the demands of a discrete motor task and prediction of (a) the minimal age…

  17. Continuity and enhancement of quality management during commissioning of W7-X

    Energy Technology Data Exchange (ETDEWEB)

    Vilbrandt, Reinhard, E-mail: reinhard.vilbrandt@ipp.mpg.de; Bosch, Hans-Stephan; Feist, Jost-Henrich; Klinger, Thomas

    2015-10-15

    Highlights: • Commissioning follows the W7-X structure into appropriate components, subsystems and systems. • Local and integrated commissioning steps are carried out alternately. • An exact and detailed preparation of all commissioning is absolutely necessary. • Templates support instruction manuals, safety analyses, and commissioning instructions. • Because of safety special attention must be paid to the first putting into service. - Abstract: The commissioning of Wendelstein 7-X, the first numerically optimized stellarator, is a new phase in the project. The general planning and execution of the commissioning of the entire W7-X system follow its structure into appropriate components, subsystems and systems. The approach for taking these systems into operation will lead to so-called local commissioning which is usually executed for individual systems in connection with the necessary peripheral devices and auxiliary systems. The subsequent step-wise testing and commissioning of the systems in connection with the central device of W7-X, including the central safety control, and the central data acquisition system is performed in the second step, the so-called integrated commissioning. This leads directly to the preparation of first plasma operation. New organizational and quality management elements have been added to the running system, or existing, proven tools have been modified. The major new organizational structures and tasks and the quality planning and assurance tools are described in more detail. The experience during the first commissioning steps of the vacuum and cryogenic systems is outlined.

  18. Indexes to Nuclear Regulatory Commission issuances, January--June 1993

    International Nuclear Information System (INIS)

    1993-11-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owner(s) of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); Type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats arranged as follows: (1) Case Name Index; (2) Digests and Headers; (3) Legal Citations Index; (4) Subject Index; (5) Facility Index

  19. LLRF beam results on the first year of ELENA’s commissioning with beam

    CERN Document Server

    Angoletta, Maria Elena; Molendijk, John; Sanchez Quesada, Jorge; CERN. Geneva. ATS Department

    2018-01-01

    CERN’s Extra Low ENergy Antiproton (ELENA) ring’s commissioning with beam started in earnest in March 2017. Ions from an H- source were injected in ELENA at low energy, although in a degraded way (lower voltage and intensity than planned) and with not constant reproducibility of the injection. From August 2017 onwards antiprotons from the AD were also injected in ELENA at high energy for up to three, weekly MD session. The 2017 ELENA commissioning run stopped on December 1st to allow the installation of the electron cooler. This note gives an overview of the successful operation carried out by the ELENA Low-Level RF (LLRF) during the first year of ELENA commissioning and of the main beam results obtained. Operation with H- ions and with antiprotons are considered, together with different operational settings and problems encountered. Hints on future deployment and commissioning steps are also provided.

  20. Commissioning of long subsea pipelines - environmental aspects

    International Nuclear Information System (INIS)

    Falck, C.; Kleppe, T.; Maribu, J.

    1997-01-01

    Discharges to air and sea are inevitable during precommissioning and commissioning of long subsea pipelines. Large quantities of water is pumped through the pipeline during these operations. This water is normally treated with corrosion inhibiting chemicals to minimise internal corrosion of the pipeline. Chemicals like methanol or glycol may be used to prevent hydrate formation, and will normally be discharged to sea during commissioning. In order to minimise the environmental impact of these operations, while maintaining corrosion protection, the Norwegian Statoil has been working for several years along three main routes such as to develop concepts and methods that minimise the discharged volumes, the use of the most environmentally friendly chemicals available, and to monitor and identify the effects of discharges to various marine species. 3 refs., 4 figs

  1. Evaluation of power commissioning of the Mochovce Unit 1 demonstration run

    International Nuclear Information System (INIS)

    Sarvaic, I.; Miskolci, M.

    1998-01-01

    The document contains evaluation of the 144 hour demonstration run of the Mochovce Unit 1. In the document, the courses and results of additional tests in this phase of power commissioning are summarized, evaluation of the performance of important systems and equipment of the unit is carried out, as well as of the compliance with Limits and Conditions in the course of the demonstration run. On this basis, conclusions are drawn and recommendations given for the unit to by ready for trial operation. The evaluation was developed by the scientific management of the Mochovce commissioning providing an independent support for the operators for supervising the commissioning tasks from the point of nuclear safety

  2. Field theoretical construction of an infinite set of quantum commuting operators related with soliton equations

    International Nuclear Information System (INIS)

    Sasaki, Ryu; Yamanaka, Itaru

    1987-01-01

    The quantum version of an infinite set of polynomial conserved quantities of a class of soliton equations is discussed from the point of view of naive continuum field theory. By using techniques of two dimensional field theories, we show that an infinite set of quantum commuting operators can be constructed explicitly from the knowledge of its classical counterparts. The quantum operators are so constructed as to coincide with the classical ones in the ℎ → 0 limit (ℎ; Planck's constant divided by 2π). It is expected that the explicit forms of these operators would shed some light on the structure of the infinite dimensional Lie algebras which underlie a certain class of quantum integrable systems. (orig.)

  3. Field theoretical construction of an infinite set of quantum commuting operators related with soliton equations

    International Nuclear Information System (INIS)

    Sasaki, Ryu; Yamanaka, Itaru.

    1986-08-01

    The quantum version of an infinite set of polynomial conserved quantities of a class of soliton equations is discussed from the point of view of naive continuum field theory. By using techniques of two dimensional field theories, we show that an infinite set of quantum commuting operators can be constructed explicitly from the knowledge of its classical counterparts. The quantum operators are so constructed as to coincide with the classical ones in the ℎ → 0 limit (ℎ; Planck's constant divided by 2π). It is expected that the explicit forms of these operators would shed some light on the structure of the infinite dimensional Lie algebras which underlie certain class of quantum integrable systems. (author)

  4. Traffic condition with road upgrading during construction and operation stages based on level-of-service (LOS)

    Science.gov (United States)

    Tay, A. C.; Lee, H. H.

    2018-04-01

    In this study, traffic survey was done at signalized intersection of both ends of an upgrading road during morning and afternoon peak hours throughout construction period. The intersections of Tudan Road located at Miri City in Sarawak State, Malaysia were chosen as study sites. The aim of this research was to investigate the traffic condition for the signalized intersections of a R3 secondary road that being upgrading to standard U5 dual carriageway during peak hours for construction and operation stages. Data collected from these sites were analyzed according to Highway Capacity Manual (HCM) 2010. From the results, the level-of-services (LOS) of Kuala Baram By Pass Road intersection improved from Level F to Level E at operation stage for weekday during peak hours in the morning. LOS of Lutong-Kuala Baram Road intersection at construction stage were Level C during peak hours in the morning and Level D during peak hours in the afternoon for weekends. However, the LOS during both peak hours for weekends were projected to improve to Level B at the operation stage. It proved that the road construction has affected LOS, and this temporary issue can be solved after the upgraded road is in operation.

  5. Canonical construction of differential operators intertwining representations of real semisimple Lie groups

    International Nuclear Information System (INIS)

    Dobrev, V.K.

    1986-11-01

    Let G be a real linear connected semisimple Lie group. We present a canonical construction of the differential operators intertwining elementary (≡ generalized principal series) representations of G. The results are easily extended to real linear reductive Lie groups. (author). 20 refs

  6. Division B Commission 40: Radio Astronomy

    NARCIS (Netherlands)

    Chapman, Jessica M.; Giovaninni, Gabriele; Taylor, Russell; Carilli, Christopher; Hills, Richard; Hirabayashi, Hisashi; Jonas, Justin L.; Lazio, Joseph; Morganti, Raffaella; Nan, Rendong; Rubio, Monica; Shastri, Prjaval; Kellermann, Ken; Ekers, Ronald; Ohishi, Masatoshi

    2016-01-01

    IAU Commission 40 for Radio Astronomy (hereafter C40) brought together scientists and engineers who carry out observational and theoretical research in radio astronomy and who develop and operate the ground and space-based radio astronomy facilities and instrumentation. As of June 2015, the

  7. Socioeconomic impacts of nuclear power plants: a paired comparison of operating facilities

    International Nuclear Information System (INIS)

    Shields, M.A.; Cowan, J.T.; Bjornstad, D.J.

    1979-07-01

    This study compares the social, economic, and political effects of constructing and operating two nuclear power plants in the rural Southeast: Brunswick 1 and 2 in Brunswick County, North Carolina, and Hatch 1 and 2 in Appling County, Georgia. It is a comparative, post-licensing case study designed to analyze variations in the range and magnitude of impacts experienced by the areas in which the plants were constructed. The study is intended to assist the Nuclear Regulatory Commission in the preparation of socioeconomic impact sections of environmental impact statements for proposed nuclear power stations

  8. Commissioning of the iGp Feedback System at DAΦNE

    International Nuclear Information System (INIS)

    Drago, A.; Fox, J.D.; Teytelman, D.; Tobiyama, M.

    2011-01-01

    The iGp (Integrated Gigasample Processor) is an innovative digital bunch-by-bunch feedback system developed by a KEK / SLAC / INFN-LNF joint collaboration. The processing unit can sample at 500 MHz and compute the bunch-by-bunch output signal for up to ∼5000 bunches. The feedback gateware code is implemented inside just one FPGA (Field Programmable Gate Array) chip, a Xilinx Virtex-II. The FPGA implements two banks of 16-tap FIR (Finite Impulse Response) filters. Each filter is realtime programmable through the operator interface. At DAΦNE, the Frascati Φ-Factory, two iGp units have been commissioned in the April 2007. The iGp systems have substituted the previous betatron feedback systems. This insertion has been very fast and has shown no problems involving just a substitution of the old, less flexible, digital systems, letting unchanged the baseband analog frontend and backend. The commissioning has been very simple, due to the complete and powerful EPICS operator interface, working well in local and remote operations. The software includes also tools for analyzing post processor data. A description of the commissioning with the operations done is reported.

  9. Environmental assessment report: Nuclear Test Technology Complex. [Construction and operation of proposed facility

    Energy Technology Data Exchange (ETDEWEB)

    Tonnessen, K.; Tewes, H.A.

    1982-08-01

    The US Department of Energy (USDOE) is planning to construct and operate a structure, designated the Nuclear Test Technology Complex (NTTC), on a site located west of and adjacent to the Lawrence Livermore National Laboratory. The NTTC is designed to house 350 nuclear test program personnel, and will accommodate the needs of the entire staff of the continuing Nuclear Test Program (NTP). The project has three phases: land acquisition, facility construction and facility operation. The purpose of this environmental assessment report is to describe the activities associated with the three phases of the NTTC project and to evaluate potential environmental disruptions. The project site is located in a rural area of southeastern Alameda County, California, where the primary land use is agriculture; however, the County has zoned the area for industrial development. The environmental impacts of the project include surface disturbance, high noise levels, possible increases in site erosion, and decreased air quality. These impacts will occur primarily during the construction phase of the NTTC project and can be mitigated in part by measures proposed in this report.

  10. The ATLAS trigger high-level trigger commissioning and operation during early data taking

    CERN Document Server

    Goncalo, R

    2008-01-01

    The ATLAS experiment is one of the two general-purpose experiments due to start operation soon at the Large Hadron Collider (LHC). The LHC will collide protons at a centre of mass energy of 14~TeV, with a bunch-crossing rate of 40~MHz. The ATLAS three-level trigger will reduce this input rate to match the foreseen offline storage capability of 100-200~Hz. After the Level 1 trigger, which is implemented in custom hardware, the High-Level Trigger (HLT) further reduces the rate from up to 100~kHz to the offline storage rate while retaining the most interesting physics. The HLT is implemented in software running in commercially available computer farms and consists of Level 2 and Event Filter. To reduce the network data traffic and the processing time to manageable levels, the HLT uses seeded, step-wise reconstruction, aiming at the earliest possible rejection. Data produced during LHC commissioning will be vital for calibrating and aligning sub-detectors, as well as for testing the ATLAS trigger and setting up t...

  11. Commissioning and first operation of the pCVD diamond ATLAS Beam Conditions Monitor

    CERN Document Server

    Dobos, D

    2009-01-01

    The main aim of the ATLAS Beam Conditions Monitor is to protect the ATLAS Inner Detector silicon trackers from high radiation doses caused by LHC beam incidents, e.g. magnet failures. The BCM uses in total 16 1x1 cm2 500 μm thick polycrystalline chemical vapor deposition (pCVD) diamond sensors. They are arranged in 8 positions around the ATLAS LHC interaction point. Time difference measurements with sub nanosecond resolution are performed to distinguish between particles from a collision and spray particles from a beam incident. An abundance of the latter leads the BCM to provoke an abort of the LHC beam. A FPGA based readout system with a sampling rate of 2.56 GHz performs the online data analysis and interfaces the results to ATLAS and the beam abort system. The BCM diamond sensors, the detector modules and their readout system are described. Results of the operation with the first LHC beams are reported and results of commissioning and timing measurements (e.g. with cosmic muons) in preparation for first ...

  12. Operational Work System Design and Staff Performance in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Emmanuel Ejikeme Isichei

    2017-03-01

    Full Text Available Objective: The study investigated the impact of operational work system design on staff performance in selected construction firms in Nigeria. Research Design & Methods: The study used primary data gathered with the use of a 5-point Likert scale questionnaire format administered to 138 respondents. A hypothesis was postulated to test the significance of the research problem. Data analysis was carried out using correlation and multiple regression analysis which proved the significance of the alternative hypothesis as a result of testing the hypothesis. Findings: The findings show that there is a significant relationship between operational work system design and staff performance. The study concludes that operational job design can be advanced as a motivation tool, which is non-monetary in nature, to improve staff performance. Implications & Recommendations: A key drive to improve performance is the satisfaction of staff coupled with an outstanding operational job design which takes into consideration the total physical and mental well-being of staff and its interaction with other organisational factors. The study recommends, among others, that there should be active participation of staff in the design of work in the organisation. Contribution & Value Added: The study provides an empirical approach to enhancing performance in the construction industry and thereby developing an indigenous firm to compete favourably on a growing market.

  13. Commissioning of Qinshan phase III PHWR nuclear power plant (2 x 700 MW)

    International Nuclear Information System (INIS)

    Gu Jun

    2004-12-01

    As the first CANDU type NPP built in China, the commissioning team established a very efficient and high standard commissioning management system. Unit 1 was put into commercial operation 43 days in advance and 112 days ahead of schedule for Unit 2. Commissioning quality achieved international advanced level. The commissioning period created new world history record of heavy water nuclear power plants. A summary for the practice and the experience of TQNPC obtained in the commissioning of the two unit was given. (authors)

  14. Commissioning of energy-efficiency measures: Costs and benefits for 16 buildings

    Energy Technology Data Exchange (ETDEWEB)

    Piette, M.A.; Nordman, B.; Greenberg, S.

    1995-04-01

    Building systems and energy-efficiency measures (EEMs) often don`t perform as well in practice as expected at the design stage. This fact has become clear to many organizations concerned with ensuring building performance. What to do about these problems is less clear. Several electric utilities around the U.S. have begun to take action to address the start-up, control, and operational problems that are found in nearly every building. One of the most beneficial periods to intervene in the building life cycle is during the start-up phase of a now building. Building commissioning during start up is such an intervention. Commissioning can be defined as: a set of procedures, responsibilities, and methods to advance a system from static installation to full working order in accordance with design intent. In broad terms, commissioning can extend from design reviews through operations and maintenance planning and training. With such a broad scope aimed at the entire building life cycle, commissioning is often likened to {open_quotes}Total Quality Management{close_quotes} Yet the heart of commissioning are the procedures developed and executed to ensure that all building systems function as intended. The incorporation of energy-efficiency criteria into building commissioning is a new development.

  15. 47 CFR 0.5 - General description of Commission organization and operations.

    Science.gov (United States)

    2010-10-01

    ...) Office of Workplace Diversity (11) Wireline Competition Bureau. (12) Wireless Telecommunications Bureau... information concerning the Commission.) (c) Delegations of authority to the staff. Pursuant to section 5(c) of..., on its own motion or on an application for review filed by a person aggrieved by the action. Except...

  16. The Philippine Atomic Energy Commission and its training program

    International Nuclear Information System (INIS)

    Ragot, T.A.

    1981-01-01

    This article briefly but comprehensively enumerates the functions and responsibilities of the Commission with emphasis on its local and overseas training program. It emphasizes the significance of these programs in meeting the manpower need of the country especially with the construction of the first nuclear power plant. (author)

  17. Establishment of Biosafety Level-3 (BSL-3 laboratory: Important criteria to consider while designing, constructing, commissioning & operating the facility in Indian setting

    Directory of Open Access Journals (Sweden)

    Devendra T Mourya

    2014-01-01

    This article describes the major steps involved in the process of construction of a BSL-3 laboratory in Indian settings, from freezing the concept of proposal to operationalization phase. The key to success of this kind of project is strong institutional commitment to biosafety norms, adequate fund availability, careful planning and designing, hiring good construction agency, monitoring by experienced consultancy agency and involvement of scientific and engineering personnel with biocontainment experience in the process.

  18. US Nuclear Regulatory Commission organization charts and functional statements. Revision 17

    International Nuclear Information System (INIS)

    1994-01-01

    This document is a detailed organizational chart detailing the different staffing and board offices. They include: the commission, the several committees and boards, the commission staff offices, the office of the Inspector General, the executive director for operations and staff offices, and the regional and program offices

  19. HYTEST Phase I Facility Commissioning and Modeling

    Energy Technology Data Exchange (ETDEWEB)

    Lee P. Shunn; Richard D. Boardman; Shane J. Cherry; Craig G. Rieger

    2009-09-01

    The purpose of this document is to report the first year accomplishments of two coordinated Laboratory Directed Research and Development (LDRD) projects that utilize a hybrid energy testing laboratory that couples various reactors to investigate system reactance behavior. This work is the first phase of a series of hybrid energy research and testing stations - referred to hereafter as HYTEST facilities – that are planned for construction and operation at the Idaho National Laboratory (INL). A HYTEST Phase I facility was set up and commissioned in Bay 9 of the Bonneville County Technology Center (BCTC). The purpose of this facility is to utilize the hydrogen and oxygen that is produced by the High Temperature Steam Electrolysis test reactors operating in Bay 9 to support the investigation of kinetic phenomena and transient response of integrated reactor components. This facility provides a convenient scale for conducting scoping tests of new reaction concepts, materials performance, new instruments, and real-time data collection and manipulation for advance process controls. An enclosed reactor module was assembled and connected to a new ventilation system equipped with a variable-speed exhaust blower to mitigate hazardous gas exposures, as well as contract with hot surfaces. The module was equipped with a hydrogen gas pump and receiver tank to supply high quality hydrogen to chemical reactors located in the hood.

  20. A study on the operator's errors of commission (EOC) in accident scenarios of nuclear power plants: methodology development and application

    International Nuclear Information System (INIS)

    Kim, Jae Whan; Jung, Won Dea; Park, Jin Kyun; Kang, Da Il

    2003-04-01

    As the concern on the operator's inappropriate interventions, the so-called Errors Of Commission (EOCs), that can exacerbate the plant safety has been raised, much of interest in the identification and analysis of EOC events from the risk assessment perspective has been increased. Also, one of the items in need of improvement for the conventional PSA and HRA that consider only the system-demanding human actions is the inclusion of the operator's EOC events into the PSA model. In this study, we propose a methodology for identifying and analysing human errors of commission that might be occurring from the failures in situation assessment and decision making during accident progressions given an initiating event. In order to achieve this goal, the following research items have been performed: Firstly, we analysed the error causes or situations contributed to the occurrence of EOCs in several incidents/accidents of nuclear power plants. Secondly, limitations of the advanced HRAs in treating EOCs were reviewed, and a requirement for a new methodology for analysing EOCs was established. Thirdly, based on these accomplishments a methodology for identifying and analysing EOC events inducible from the failures in situation assessment and decision making was proposed and applied to all the accident sequences of YGN 3 and 4 NPP which resulted in the identification of about 10 EOC situations

  1. Planning, Investment, Construction and Operation of Rail Transit in Beijing

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    In Beijing, the rail transit firstly came into existence in the mid 1960s and was officially put into operation for civil use in the early 1980s. It has entered a period of rapid development since 2001, with thanks to the coming of the Olympic Games in 2008, and has been playing a more and more important role in the passenger transport of Beijing since then on, as a key part of the public transportation. Based on a resume on the evolution of rail transit development in Beijing, this paper analyzes the mechanism of policy-making, the mode of investment and financing, the procedure of construction, and the management of operation of rail transit, all of which ensure its rapid development and effective performance.

  2. European Sustainable Construction Regulation : Homogeneity and Attention

    NARCIS (Netherlands)

    Van der Heijden, J.; Van Bueren, E.M.

    2011-01-01

    Understanding the negative impact of the construction industry and the built environment on the ecological environment, the European Commission (EC) aims to harmonise and improve sustainable construction regulatory frameworks in Member States of the European Union. This paper discusses the topics of

  3. Construction and operation of an industrial solid waste landfill at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The US Department of Energy (DOE), Office of Waste Management, proposes to construct and operate a solid waste landfill within the boundary of the Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Ohio. The purpose of the proposed action is to provide PORTS with additional landfill capacity for non-hazardous and asbestos wastes. The proposed action is needed to support continued operation of PORTS, which generates non-hazardous wastes on a daily basis and asbestos wastes intermittently. Three alternatives are evaluated in this environmental assessment (EA): the proposed action (construction and operation of the X-737 landfill), no-action, and offsite shipment of industrial solid wastes for disposal.

  4. Construction and operation of an industrial solid waste landfill at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    International Nuclear Information System (INIS)

    1995-10-01

    The US Department of Energy (DOE), Office of Waste Management, proposes to construct and operate a solid waste landfill within the boundary of the Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Ohio. The purpose of the proposed action is to provide PORTS with additional landfill capacity for non-hazardous and asbestos wastes. The proposed action is needed to support continued operation of PORTS, which generates non-hazardous wastes on a daily basis and asbestos wastes intermittently. Three alternatives are evaluated in this environmental assessment (EA): the proposed action (construction and operation of the X-737 landfill), no-action, and offsite shipment of industrial solid wastes for disposal

  5. Construction techniques and management methods for BWR plants

    International Nuclear Information System (INIS)

    Shimizu, Yohji; Tateishi, Mizuo; Hayashi, Yoshishige

    1989-01-01

    Toshiba is constantly striving for safer and more efficient plant construction to realize high-quality BWR plants within a short construction period. To achieve these aims, Toshiba has developed and improved a large number of construction techniques and construction management methods. In the area of installation, various techniques have been applied such as the modularization of piping and equipment, shop installation of reactor internals, etc. Further, installation management has been upgraded by the use of pre-installation review programs, the development of installation control systems, etc. For commissioning, improvements in commissioning management have been achieved through the use of computer systems, and testing methods have also been upgraded by the development of computer systems for the recording and analysis of test data and the automatic adjustment of controllers in the main control system of the BWR. This paper outlines these construction techniques and management methods. (author)

  6. Design,construction and commissioning of a cylinder of double-sided silicon micro-strips detectors for the Star experiment at RHIC

    International Nuclear Information System (INIS)

    Guedon, M.

    2005-05-01

    This study has been performed in the frame of quark gluon plasma physics research in the STAR experiment at RHIC. It deals with the design, the construction and the commissioning of a barrel of silicon-strip detectors (SSD). Added to the Silicon Vertex Tracker (SVT) of the STAR detector, it extends the capabilities of track reconstruction for charged particles emitted in ultra-relativistic heavy-ion collisions. It also contributes to the general study of the quark-gluon plasma production undertaken at STAR. The SSD is a cylinder of 1 m long and of 23 cm radius, and it is composed of 320 compact identical modules. Each module includes one double-sided silicon micro-strip detector, 12 readout chips ALICE 128C, 12 TAB ribbons, 2 COSTAR control chips and 2 hybrids supporting all the components. The document explains why the SSD is an important and relevant element, and justifies the technological choices as well as their validation by in-beam characterization. All component functionalities, characteristics and test procedures are presented. The data and test results are stored in a database for tracing purpose. Component and module production is described. Two parallel studies have been performed, analysed and described. One on the temperature dependence of the module performances and the other one on the optimal adjustments of the analogue blocks inside the ALICE 128C chip. The SSD installation on the RHIC site as well as the commissioning are presented together with the first data takings. (author)

  7. Indexes to Nuclear Regulatory Commission Issuances, January-June 1981

    International Nuclear Information System (INIS)

    1982-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility); Full text reference (volume and pagination); Issuance number; Issues raised by appellants; Legal citations (cases, regulations, and statutes); Name of facility, Docket number; Subject matter of issues and/or rulings; Type of hearing (for construction permit, operating license, etc.); and Type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index, Digests and Headers, Legal Citations Index, Subject Index, and Facility Index

  8. Indexes to Nuclear Regulatory Commission Issuances, January--March 1990

    International Nuclear Information System (INIS)

    1990-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: case name (owner(s) of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, Docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.). These information elements are displayed in one or more of five separate formats arranged as follows: case name index; digests and headers; legal citations index; subject index; and facility index

  9. Law of the Energy Regulatory Commission

    International Nuclear Information System (INIS)

    1995-01-01

    This Decree-Law consist of three chapters each on divided in articles and subsections and came into force in November 1 st., 1995. Chapter I, with the heading 'Nature and Powers', defines the Energy Regulatory Commission as a decentralized organ of the Energy Secretariat with technical and operative autonomy in terms of the law, and establish the conditions for the sell, generation, exportation and importation of electricity with destination to particular and public services. The sell transport, storage and distribution of natural gas, as well as the gas liquefied from petroleum are also considered. Chapter II with the heading 'Organization and duties' establish that the Commission is integrated by five Committee, the President included. The Committee members will deliberate in collegiate manner and the decisions are by majority, having the President a vote of quality. Chapter III for 'General provisions' is related to the lawsuits arises between the Commission and the users of services. (Author)

  10. 20 Years of Dukovany NPP Operation and Plans for Future

    International Nuclear Information System (INIS)

    Vlcek, J.

    2006-01-01

    NPP Dukovany (4x440MW), the first Czech nuclear power plant and a keystone of Czech Electricity Grid, in 2005 celebrated 20 years of successful operation. In my presentation I am going to speak about next areas. I will start about construction and commissioning history of Dukovany NPP, then I'll put forward what milestones of Dukovany NPP operation were accomplished, I'll say examples about our modernisation and investment activities (including replacement of IandC equipment, modifications for increasing of power and support grid services) and in the end our plans for future. (author)

  11. Indexes to Nuclear Regulatory Commission issuances, January-June 1983. Volume 17, Index 2

    International Nuclear Information System (INIS)

    1983-10-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and Licensing Appeal Panel (ALAB), the Atomic Safety and Licensing Board Panel (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions of Rulemaking are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility); full text reference (volume and pagination); issuance number; issues raised by appellants; legal citations (cases, regulations, and statutes); name of facility, Docket number; subject matter of issues and/or rulings; type of hearing (for construction permit, operating license, etc.); and type of issuance (memorandum, order, decision, etc.)

  12. Classification and Construction of Invertible Linear Differential Operators on a One-Dimensional Manifold

    Directory of Open Access Journals (Sweden)

    V. N. Chetverikov

    2014-01-01

    Full Text Available Invertible linear differential operators with one independent variable are investigated. The problem of description of such operators is important, because it is connected with transformations and the classification of control systems, in particular, with the flatness problem.Each invertible linear differential operator represents a square matrix of scalar differential operators. Its product with an operator-column is an operator-column whose order does not exceed the sum of orders of initial operators. The operators-columns, the product with which leads to order fall, i.e. the order of the product is less than sum of orders of factors, are interesting for the description of invertible operators. In this paper the classification of invertible operators is based on dimensions dk,p of intersections of modules Gp and Fk for various k and p, where Gp is the module of all operators-columns of order not above p, and Fk is the module of compositions of the invertible operator with all operators-columns of order not above k. The invertible operators that have identical sets of numbers dk,p form one class.In the paper the general properties of tables of numbers dk,p for invertible operators are investigated. A correspondence between invertible operators and elementary-geometrical models which in the paper are named by d-schemes of squares is constructed. The invertible operator is ambiguously defined by its d-scheme of squares. The mathematical structure that must be set for its unique definition and an algorithm for the construction of the invertible operator are offered.In the proof of the main result, methods of the theory of chain complexes and their spectral sequences are used. In the paper all necessary concepts of this theory are formulated and the corresponding facts are proved.Results of the paper can be used for solving problems in which invertible linear differential operators are arisen. Namely, it is necessary to formulate the conditions on

  13. Dosimetry measurements during the commissioning of the GJ-2 electron accelerator

    DEFF Research Database (Denmark)

    Chosdu, R.; Hilmy, N.; Tobing, R.

    1995-01-01

    The GJ-2 electron accelerator (made in China, Sanghai) was put into operation at the Centre for Application of Isotopes and Radiation in Jakarta, Indonesia. In the course of the commissioning of the machine its main technical parameters were measured under different operating conditions. The elec......The GJ-2 electron accelerator (made in China, Sanghai) was put into operation at the Centre for Application of Isotopes and Radiation in Jakarta, Indonesia. In the course of the commissioning of the machine its main technical parameters were measured under different operating conditions......, ethanol-chlorobenzene dosimeter solution and FWT-60 film dosimeters. The applicability of polystyrene calorimeters designed for low electron energies at Ris phi National Laboratory was also tested for nominal dose determination....

  14. The commission of energy regulation: statute, missions and authority

    International Nuclear Information System (INIS)

    Laffaille, D.; Bossoutrot, Ch.

    2008-01-01

    The commission of energy regulation (CRE), which has superseded the commission of electricity regulation, was created by the law no. 2000-108 from February 10, 2000, relative to the modernization and development of the French electric utility. This article presents the situation of CRE's statute, missions and authority seven years after its creation. The statute of CRE warrants its independence, autonomy and impartiality. Its operation means consist in budgetary and personnel resources. Its main mission is the control of the conditions of use of gas and electricity networks and the respect of competition rules: free and transparent access to networks and infrastructures, control of the good operation and development of networks and facilities, regulation of markets, strengthening of the public utility mission. Its authority concerns the management of networks, the book-keeping control of energy operators, the settlement of disputes, the attribution of sanctions, the monitoring of energy markets operation etc. (J.S.)

  15. Survey commission of the Manche center

    International Nuclear Information System (INIS)

    2002-01-01

    The subjects discussed during the Survey commission of the storage center of the Manche CSCM, held in october 2001, are presented in this document. They deal with the site survey, the maintenance facilities realized on this installations, the tritium survey in the water and the CSCM operating. (A.L.B.)

  16. Advanced boiling water reactor (ABWR). Design, construction, operation and maintenance experience

    International Nuclear Information System (INIS)

    Idesawa, M.

    1998-01-01

    The ABWR has experienced all phases of design, construction, operation and maintenance at Kashiwazaki-Kariwa Nuclear Power Station Units No.6 and 7 and confirmed that originally intended development targets have been achieved with highly satisfactory results. This is the fruit of a project that collected wisdom from various sources under a international cooperative organization, with Tokyo Electric Power Company taking the leading role from the onset. These two units have not only demonstrated that ABWRs have superior performance as the first standard units of advanced light water reactor but also aroused a hope for the big potential advantages that ABWRs can provide us. The ABWR has already been awarded a U.S. standard license for having proved that it can comply with the requirements of international regulatory systems with an ample margin. There are also many construction programs with ABWRs progressing both domestically and abroad, suggesting that it has won recognition as an international standard plant. We will do our utmost to perfect the operation and maintenance records of Kashiwazaki-Kariwa Units No.6 and 7, which is the top runner among ABWRs, and to make known the superiority of this reactor to the world. (J.P.N.)

  17. Construct validity in Operations Management by using Rasch Measurement Theory. The case of the construct “motivation to implement continuous improvement"

    Directory of Open Access Journals (Sweden)

    Lidia Sanchez-Ruiz

    2016-12-01

    Full Text Available Construct design and validation is a common practise in the Operations Management field. In this sense, the aim of this study is to present Rasch Measurement Theory (RMT as richful and useful methodology in order to validate constructs. In order to do so, the measurement controversy in the social science is presented; then, RMT is explained as a solution for this measurement issue; after that, the different applications of RMT are described and, finally, the different stages of the validation process are presented. Thus, this work aims to serve as a guide for those researchers interested in the methodology. Therefore, a specific case is included: the validation of the construct “motivation to implement continuous improvement”.

  18. Fire protection programme during construction of the Chashma nuclear power plant

    International Nuclear Information System (INIS)

    Mian Umer, M.

    1998-01-01

    A clear view is given of several measures that have been taken with regard to fire prevention, protection and fire fighting during all phases of the construction, installation and commissioning of the Chasma nuclear power plant to protect personnel and equipment so that any delays in plant operation as a result of fire incident can be avoided. These measures include the precautions taken, the provisions made for fire extinguishers and hydrants, and the setting up of a fire brigade. An overview is also given of the fire incidents that have occurred. (author)

  19. International co-operation

    International Nuclear Information System (INIS)

    Klinda, J.; Lieskovska, Z.

    1998-01-01

    Within the Union Nations (UN) framework, the Slovak Republic participated in following activities on environment protection co-operation: UN European Economic Commission, UN Industrial Development Organization, UN Development Programme, UN Human Habitat Organization, UN Environment Programme, and UN Commission on Sustainable Development. Relevant activities of the Slovak Republic in these co-operations as well as in European Union and OECD activities are reviewed. International conventions and other forms of multilateral co-operation, bilateral co-operation, and international programmes and projects in which the Slovak Republic took participate are presented

  20. Current problems associated with nuclear plant construction contracts

    International Nuclear Information System (INIS)

    Albano, Raffaele.

    1977-01-01

    The expansion of nuclear electricity generating programmes has brought to the fore the problems associated with construction of this type of power plant. The paper analyses the contracts for such construction and describes the most common, the turnkey contract. The present tendency is to limit the scope of turnkey contracts to the nuclear system or simply to the reactor and this is especially common in advanced nuclear countries such as the US, Canada, Japan, UK and France, and this is also the case in Italy where the question of contracting nuclear plants is debated. In Germany the power utilities hold a large number of shares in the manufacturing industry and the turnkey contract is therefore more economically attractive. A detailed description of the contracting procedure is provided, including the suppliers' and purchasers' responsibilities, plant commissioning tests and handing over of the plant to the operator. (NEA) [fr

  1. State Electricity Commission of Victoria. Annual report 1984-1985

    Energy Technology Data Exchange (ETDEWEB)

    1985-01-01

    The State Electricity Commission of Victoria is a body corporate first constituted under the Electricity Commissioner's Act 1918. It now operates under the State Electricity Commission Act 1958. It generates, transmits and distributes electricity throughout Victoria's 228,000 square kilometres and supplies directly to 1.424 million customers. In addition 277,800 customers are supplied by eleven municipal authorities which purchase electricity in bulk from the Commission. The Commission also has a regulatory responsibility to ensure the safe use of electricity. It employs 22,518 people. The installed capacity of generators in the Commission's system, plus Victoria's share of Snowy and Hume generation, totalled 6603 MW at 30 June 1985 and the main transmission system comprises 500 kV, 300 kV and 220 kV lines. Corporate objectives have been developed in seven broad areas: customers,employee, finance, ntural resources, environment, conservationand community. These areas of activity are detailed in this report.

  2. Incentive regulation of nuclear power plants by state public utility commissions

    International Nuclear Information System (INIS)

    Petersen, J.C.

    1987-12-01

    This report on incentive regulation of nuclear power plants by state public utility commissions (PUCs). Economic performance incentives established by state PUCs are applicable to the construction or operation of about 45 nuclear power reactors owned by 30 utilities in 17 states. The NRC staff monitors development of the incentives and periodically provides an updated report on all nuclear plant incentives to its regional offices. The staff maintains contact with the PUCs and the utilities responsible for implementing the incentives in order to obtain the updated information and to consider potential safety effects of the incentives. This report presents the NRC staff's concerns on potential safety effects of economic performance incentives. It also includes a plant-by-plant survey that describes the mechanics of each incentive and discusses the financial effects of the incentive on the utility-owner(s) of the plant

  3. CEBAF Cryomodule Commissioning in the South Linac

    International Nuclear Information System (INIS)

    M. Drury; H. Lankford; T. Lee; J. Marshall; J. Preble; Q. Saulter; W. Schneider; Michael Spata; Mark Wiseman

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, 38 1/4 cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz[1]. A cryomodule must provide an energy gain of 20 MeV to the 200 mu-A beam[2]. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's (Q(sub ext)) of the cavity ports, the unloaded Q (Q(sub 0)) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity[3]. Finally, the mechanical tuners are cycled and characterized. A portable test stand allows local control of the rf system and provides automated data acquisition. During the period from April 1993 through September 1993, 16 of the 20 cryomodules installed in the South Linac were commissioned. All cryomodules tested in the South Linac meet or exceed the CEBAF specifications. This paper describes the results of the commissioning of the first 10 cryomodules in the South Linac

  4. Indexes to Nuclear Regulatory Commission issuance, July-December 1980. Index of Volume 12, Number 4

    International Nuclear Information System (INIS)

    1980-01-01

    Issuances of the Atomic Safety and Licensing Board (ASLB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Administrative Law Judge (ALJ), regulatory issuances of the Commission (CLI), the Directors Denial (DD), and the Denials of Petitions for Rulemaking for the period July through December 1980 appear in Nuclear Regulatory Commission Issuances, 12 NRC No. 1, Pages 1-136, through 12 NRC No. 6, Pages 607-742. Digests and indexes for these issuances are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements common to the cases heard and ruled upon are: Case name (owners of facility); Name of facility, docket number; Type of hearing (for construction permit, operating licenses, etc.); Issues raised by appellants; Issuance number; Type of issuance (memorandum, order, decision, etc.); Issuance pagination; Legal citations (cases, regulations, and statutes); and Subject matter of issues and/or rulings. These information elements are displayed in one or more of five separate formats arranged as follows: Case name index; Digests and headers; Legal citation index; Subject index; and Facility index

  5. Is woodfuel a strategic issue for the Forestry Commission?

    International Nuclear Information System (INIS)

    Simpson, James

    2000-01-01

    The chapter allows us to answer the question: Is wood fuel a strategic issue for the Forestry Commission? The key points are that: Wood fuel is a strategic issue for the Forestry Commission; Wood fuel is a forest product which can be obtained from both short and long rotation woodlands. Although demand at an industrial scale is relatively low at present there appear to be good prospects for an increase in the near future; The silvicultural systems and forest operations which are employed in the production of wood fuel must be compatible with the UK Forestry Standard and must take account of economic, environmental and social sustainability; The Forestry Commission, as the lead department in GB forestry matters, uses a range of mechanisms in the promotion of sustainable forest management. Many of these are directly applicable to the production of wood fuel; The Forestry Commission's approach to funding research on silvicultural systems and forest operations is based on the identification and removal of barriers which appear to be standing in the way of sustainable forest management. The wood fuel industry could be far more significant to forest management than it is today and this has implications for our research programme. (Author)

  6. Legal preconditions for the construction and operation of district gas mains

    Energy Technology Data Exchange (ETDEWEB)

    Joachim, H

    1977-06-01

    The course of procedure in connection with the construction of district gas mains is outlined. This includes acquisition of main rights under private law and expropriation law, special problems such as peculiarities of land or landscape, road crossings, facilities of the Federal railway, agriculture etc., operational problems such as protection zones, building territories within the area of the main layout, drainage effects, high-pressure pipes, etc.

  7. The Time-Of-Flight detector of ALICE at LHC: construction, test and commissioning with cosmic rays

    CERN Document Server

    Preghenella, Roberto

    2009-01-01

    After several years of research and development the Time-Of-Flight detector of ALICE (A Large Ion Collider Experiment) has been constructed and is presently fully installed and operative in the experimental area located at the interaction point n.2 of the LHC (Large Hadron Collider) at CERN. Particle identification in ALICE is essential, as many observables are either mass or flavour dependent, therefore many different techniques are used to cover the largest possible momentum range. As said, the TOF (Time- Of-Flight) detector, of which a comprehensive review is given in Chapter 2, is dedicated to hadron identification at medium momenta. The detector exploits the novel technology based on the Multigap Resistive Plate Chamber (MRPC) which guarantees the excellent performance required for a very large time-of-flight array. The construction of the ALICE TOF detector has required the assembly of a large number of MRPC detectors which has been successfully carried out thanks to a careful mass production controlled...

  8. Construction and commissioning of workrooms for handling of unsealed radioactive materials

    International Nuclear Information System (INIS)

    Weinhold, G.; Jost, E.; Koenig, W.

    1976-03-01

    The requirements prescribed for planning, design and construction of type II and III workrooms for handling of unsealed sources are outlined. The 'Guide Concerning Construction and Equipment of Rooms for Handling of Radioactive Materials' is explained and supplemented in part. Furthermore, problems of radiation protection organization and measuring techniques are discussed. (author)

  9. Commissioning of the CEBAF cryomodules

    International Nuclear Information System (INIS)

    Drury, M.; Lee, T.; Marshall, J.; Preble, J.; Saulter, Q.; Schneider, W.; Spata, M.; Wiseman, M.

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, over half of the cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz. A cryomodule must provide an energy gain of 20 MeV to the 200 μA beam. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's of the cavity ports, the unloaded Q (Q 0 ) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity. The sensitivity of the resonant frequency to changes in pressure and gradient is also measured. Finally, the mechanical tuners are cycled and characterized. In all cases, the performance of CEBAF cryomodules has exceeded the design requirements. A portable test stand allows local control of the rf system and provides automated data acquisition. This paper describes the cryomodule commissioning hardware, software, and measurements

  10. Continuous commissioning of buildings: A case study of a campus building in Denmark

    DEFF Research Database (Denmark)

    Markoska, Elena; Jradi, Muhyiddine; Jørgensen, Bo Nørregaard

    2016-01-01

    The general trend in building commissioning is that the commissioning is often either insufficiently comprehensive in its execution, or it is not conducted at all. As such, it has been observed that buildings often will contain faults that have not been discovered during the commissioning phase....... In this paper, we present a framework for continuous verification and commissioning of a building with a set of performance tests that are able to monitor the performance and functionality with a daily granularity. The performance tests are run on a newly constructed campus building in Denmark, over the course...... of three months, and the results of the performance tests are presented within a dashboard application, which helps verify that the building is performing accordingly to its original design intent....

  11. [Commissioning of the newly constructed Beijing electron-positron collider BEPC, Beijing, China, and visit to SRRC to discuss magnet manufacturing and measurement methods, Taipei, Taiwan, November 11--27, 1988]: Foreign trip report

    International Nuclear Information System (INIS)

    Weng, W.T.

    1988-01-01

    The traveller was invited to IHEP to participate in the commissioning of the newly constructed Beijing electron-positron collider BEPC, give a status report on the AGS Booster Project and to assess the feasibility of sub-contracting booster sextupoles to IHEP. The trip to SRRC was undertaken to discuss magnet manufacturing and measurement methods

  12. Nuclear Regulatory Commission Information Digest, 1991 edition

    International Nuclear Information System (INIS)

    Olive, K.L.

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs

  13. Equivalent construction of the infinitesimal time translation operator in algebraic dynamics algorithm for partial differential evolution equation

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    We give an equivalent construction of the infinitesimal time translation operator for partial differential evolution equation in the algebraic dynamics algorithm proposed by Shun-Jin Wang and his students. Our construction involves only simple partial differentials and avoids the derivative terms of δ function which appear in the course of computation by means of Wang-Zhang operator. We prove Wang’s equivalent theorem which says that our construction and Wang-Zhang’s are equivalent. We use our construction to deal with several typical equations such as nonlinear advection equation, Burgers equation, nonlinear Schrodinger equation, KdV equation and sine-Gordon equation, and obtain at least second order approximate solutions to them. These equations include the cases of real and complex field variables and the cases of the first and the second order time derivatives.

  14. Canadian Nuclear Safety Commission's intern program

    International Nuclear Information System (INIS)

    Gilmour, P.E.

    2002-01-01

    The Intern Program was introduced at the Canadian Nuclear Safety Commission, Canada's Nuclear Regulator in response to the current competitive market for engineers and scientists and the CNSC's aging workforce. It is an entry level staff development program designed to recruit and train new engineering and science graduates to eventually regulate Canada's nuclear industry. The program provides meaningful work experience and exposes the interns to the general work activities of the Commission. It also provides them with a broad awareness of the regulatory issues in which the CNSC is involved. The intern program is a two-year program focusing on the operational areas and, more specifically, on the generalist functions of project officers. (author)

  15. The work of the Operational Safety Review Team (OSART)

    International Nuclear Information System (INIS)

    Hide, K.W.

    1996-01-01

    The Operational Safety Review Team (OSART) programme was set up by the IAEA in 1982 to assist Member States to enhance the operational safety of nuclear power plants. Each team is staffed by senior experts in the relevant fields. The review team discusses with plant staff the existing operational programmes for plant which may be under construction, being commissioned or already operating. Following a detailed examination of a safety programme, the OSART team lists strengths and weaknesses and makes recommendations on how to overcome the latter. Since their conclusions are based on the best prevailing international practice, they may be more stringent than those based on national criteria. The results of the 77 missions conducted at 62 plants in 28 countries by the end of 1994 are summarised. (UK)

  16. The initial criticality and nuclear commissioning test program at HANARO

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Choong-Sung; Seo, Chul-Gyo; Jun, Byung-Jin [Korea Atomic Energy Research Institute, Dukjin-Dong 150, Yusung-Ku, Taejon, 305-353 (Korea, Republic of)

    1995-07-01

    The construction of the Korea Multipurpose Research Reactor - HANARO of 3MW, developed by Korea Atomic Energy Research Institute, was completed at the beginning of this year. The first fuel loading began on February 2 1995, and initial criticality was achieved on February 8, when the core had four 18-element assemblies and thirteen 36-element assemblies. The critical control rod position was 600.8 mm which represents excess reactivity of 0.71 $. Currently the nuclear commissioning test is on going under the zero power range. This paper describes the initial criticality approach of the HANARO, and its nuclear commissioning test program. (author)

  17. H.R. 5448: a bill to amend the Atomic Energy Act of 1954, as amended, to reorganize the functions of the Nuclear Regulatory Commission by abolishing the Commission and in its place establishing the Nuclear Regulation and Safety Agency. Introduced in the House of Representatives, Ninety-Ninth Congress, Second Session, August 15, 1986

    International Nuclear Information System (INIS)

    Anon.

    1986-01-01

    The Omnibus Nuclear Safety Act of 1986 amends the Atomic Energy Act of 1954 by replacing the Nuclear Regulatory Commission with a new entity, the Nuclear Regulation and Safety Agency. The purposes are to promote an energy policy that is better coordinated and more consistent with the protection of public health and safety. The new agency would also expedite licensing for construction and operation of nuclear power plants by using pre-approved standardized designs and sites

  18. CERN Linac4 - The Space Charge Challenge Design and Commission

    CERN Document Server

    Hein, Lutz Matthias; Holzer, Bernhard

    In the first phase of the upgrade program of the CERN accelerator complex the proton injector Linac2 will be replaced by a new, normal-conducting $H^-$ ion Linac, Linac4, allowing a significant increase of the proton flux intensity along the downstream accelerator complex. In the design of Linac4 three beam transport sections are implemented to match the beam between the different accelerator elements and to model the longitudinal pulse structure. These three beam transport sections, which are the most critical locations in terms of beam quality preservation, are in the focus of this thesis. During the work of this thesis the low energy beam transport (LEBT), which is required to match the source beam to the radiofrequency quadrupole (RFQ), has been commissioned and its beam dynamics re-constructed. The measurement campaign used to re-construct the LEBT beam dynamics was performed with the aim to prepare the RFQ commissioning and to maximise the LEBT performance. Downstream of the Linac4 accelerator the beam...

  19. Preparing accelerator systems for the RHIC sextant commissioning

    International Nuclear Information System (INIS)

    Trbojevic, D.; Pilat, F.; Ahrens, L.

    1997-01-01

    The Relativistic Heavy Ion Collider (RHIC) construction is progressing steadily towards completion in 1999 when beams will circulate in both collider rings. One of the major tests of the RHIC project was the commissioning of the first sextant with gold ion beams in early 1997. This is a report on preparation of the RHIC accelerator systems for the first sextant test. It includes beam position monitors, timing, injection correction through the magnetic septum and kickers, current transformers, flags and the ionization beam profile monitors, beam loss monitors, beam and quench permit link system, power supply controls, and the configuration database system. The software and hardware development and coordination of the different systems before commissioning were regularly checked during bi-weekly, and (later) weekly, progress report meetings

  20. OSART mission highlights 1991-1992. Operational safety practices in nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-05-01

    This report continues the practice of providing summaries of the OSART missions but the format is the first of its kind. Summaries of missions in the period 1983-1990 have covered missions to operational plants, missions to plants under construction or approaching commissioning and a compilation of good practices identified in OSART missions as separate publications. The format of this report includes all such aspects in one document.

  1. OSART mission highlights 1991-1992. Operational safety practices in nuclear power plants

    International Nuclear Information System (INIS)

    1995-05-01

    This report continues the practice of providing summaries of the OSART missions but the format is the first of its kind. Summaries of missions in the period 1983-1990 have covered missions to operational plants, missions to plants under construction or approaching commissioning and a compilation of good practices identified in OSART missions as separate publications. The format of this report includes all such aspects in one document

  2. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  3. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    CERN Multimedia

    L. Malgeri

    2011-01-01

    As the technical interventions were finishing up and services restored at P5 we started central operations again in 2011. We started operations with a reduced shift crew, Shift leader and DCS shifter, on 24th January. We had a first mid-week global run on 2nd and 3rd February followed by cosmic data-taking between 10th and 20th February. Due to delays with cooling for the strip tracker the useful cosmic data-taking with the strip tracker was reduced to about four days. On 20th February, the LHC started beam commissioning, and cosmic data-taking with the full CMS detector was stopped. The machine availability has been much higher during the 2011 beam commissioning than during the comparable time period in 2010. This has given us few opportunities to turn on the tracker for further cosmic data-taking. Many changes and upgrades were performed during the winter shutdown. Among them was an upgrade to running the central DAQ on 64 bit. All of these upgrades have now b...

  4. The design, construction and commissioning of the CERN Large Electron-Positron collider

    International Nuclear Information System (INIS)

    Myers, S.; Picasso, E.

    1990-01-01

    A description is given of the most important parameters considered in the design of the CERN Large Electron-Positron collider. It is shown how these parameters affect the collider performance and how they have been optimised with respect to the cost of the project. The functioning of each major subsystem is described with respect to its role as part of the collider. Finally, the planning, testing and initial commissioning of LEP is described and possible future developments are outlined. (author)

  5. The NOνA experiment, the first 12 months of commissioning, operations and physics data

    Energy Technology Data Exchange (ETDEWEB)

    Norman, A. [Fermi National Accelerator Lab, Bativia, IL 60510 (France)

    2015-07-15

    The NOνA experiment is a long baseline neutrino experiment designed to make precision measurements of the oscillation probabilities for ν{sub µ} → ν{sub e} and ν{sub µ} → ν{sub µ} for both neutrinos and anti-neutrinos. These measurements will provide new information on the neutrino mass hierarchy, improve our knowledge of whether θ{sub 23} is non-maximal and possibility provide information on the CP violating phase δ{sub CP} of the PMNS neutrino mixing matrix. We present the observations of the first neutrino event in the NOνA far and near detectors along with data obtained during the first year of detector commissioning and operations. We use the data to demonstrate the detector’s ability to identify electron and muon neutrino events and to reject cosmic ray induced backgrounds at a level of 4 × 10{sup 7}:1. New estimates for the signal and background sensitivities of the NOνA experiment during the first year of full detector running are presented.

  6. Geothermal research and development program of the US Atomic Energy Commission

    Science.gov (United States)

    Werner, L. B.

    1974-01-01

    Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

  7. Commissioning of the new GMOS-N Hamamatsu CCDs

    Science.gov (United States)

    Scharwaechter, Julia; Chiboucas, Kristin; Gimeno, German; Boucher, Luc; White, John; Tapia, Eduardo; Lundquist, Michael; Rippa, Mathew; Labrie, Kathleen; Murowinski, Richard; Lazo, Manuel; Miller, Jennifer

    2017-06-01

    We report on the commissioning of the new Hamamatsu fully-depleted CCDs for GMOS-N, installed in the instrument in February 2017. The Hamamatsu detectors replace the e2v deep depletion devices which had been in operation since 2011. The new GMOS-N detector array is expected to provide improved red sensitivity compared to the e2v devices at wavelengths longer than ~900 nm. The commissioning of the new detector array for GMOS-N marks the final step in upgrading the two GMOS instruments at Gemini North and South with Hamamatsu detectors.

  8. Emittance reconstruction technique for the Linac4 high energy commissioning

    CERN Document Server

    Lallement, JB; Posocco, PA

    2012-01-01

    Linac4 is a new 160 MeV linear accelerator for negative Hydrogen ions (H-) presently under construction which will replace the 50 MeV proton Linac2 as injector for the CERN proton accelerator complex. Linac4 is 80 meters long and comprises a Low Energy Beam Transport line, a 3 MeV RFQ, a MEBT, a 50 MeV DTL, a 100 MeV CCDTL and a PIMS up to 160 MeV. The commissioning of the Linac is scheduled to start in 2013. It will be divided into several steps corresponding to the commissioning of the different accelerating structures. A temporary measurement bench will be dedicated to the high energy commissioning from 30 to 100 MeV (DTL tanks 2 and 3, and CCDTL). The commissioning of the PIMS will be done using the permanent equipment installed in between the end of the Linac and the main dump. This note describes the technique we will use for reconstructing the transverse emittances and the expected results.

  9. Problems of economic assessment of social impacts of construction anO operation of nuctear power plant in the area

    International Nuclear Information System (INIS)

    Koudelka, F.

    1984-01-01

    The impacts of nuclear power plant construction and operation are divided into economic, demographic, on town planning, historic, etc. Further subdivision is performed according to the intensity of construction impacts, to the sequence and quality of impact and to the effects in space and time. The area of environmental impacts is classified into the protective area and the areas of immediate, limited and broad impact. The methods of the evaluation of nuclear power plant construction and operation impacts are discussed. (E.S.)

  10. Industrial Disputes in the Construction Sector

    Directory of Open Access Journals (Sweden)

    L.J Perry

    2012-11-01

    Full Text Available The Cole Royal Commission enquiry into the building and construction (abbreviated to ‘construction’ sector recommended controversial workplace-relation reforms for that sector. The recommended changes are likely to be enshrined in legislation within the year. The Commission drew on analyses of industrial disputes that focused, in the main, on quite recent experience. This paper attempts to give a broader historical perspective on disputes in that sector by considering the pattern of disputes for the entire post-World War II period. Accordingly, data on disputes and employees during the entire period are gathered from Australian Bureau of Statistics current and archived sources. These data are classified according to sector (construction versus non-construction and analysed. It is found that the strike rate has, on average, been greater in the construction sector than in the non-construction sector. However, there have been periods during which disputes in the construction sector have been relatively low. The most recent period was during the period of the Accord (1983-96, during which the strike rate in the construction sector fell relatively strongly. The analysis of this relatively broad historical period draws attention, among other things, to the possibility that the sort of strategies employed during the Accord years – strategies of cooperation and consensus building – may provide a more effective means of bringing industrial peace to the workplace relations scene of the construction sector than policies that are relatively confrontational.

  11. Commissioning of the RFQ1 injector

    International Nuclear Information System (INIS)

    Arbique, G.M.; Sheikh, J.Y.; Taylor, T.; Birney, L.F.; Davidson, A.D.; Wills, J.S.C.

    1987-01-01

    The RFQ1 accelerator is being developed at Chalk River to test the limits of the cw RFQ technology. A 50 kV injector has been built and is now being commissioned as the first phase of the program. This paper describes some of the innovative features of the RFQ1 injector and reports on initial operating experience

  12. Construction and initial operation of MHD PbLi facility at UCLA

    Energy Technology Data Exchange (ETDEWEB)

    Smolentsev, S., E-mail: sergey@fusion.ucla.edu; Li, F.-C.; Morley, N.; Ueki, Y.; Abdou, M.; Sketchley, T.

    2013-06-15

    Highlights: • New MHD PbLi loop has been constructed and tested at UCLA. • Pressure diagnostics system has been developed and successfully tested. • Ultrasound Doppler velocimeter is tested as velocity diagnostics. • Experiments on pressure drop reduction have been performed. • Experiments on MHD flow in a duct with SiC flow channel insert are underway. -- Abstract: A magnetohydrodynamic flow facility MaPLE (Magnetohydrodynamic PbLi Experiment) that utilizes molten eutectic alloy lead–lithium (PbLi) as working fluid has been constructed and tested at University of California, Los Angeles. The loop operation parameters are: maximum magnetic field 1.8 T, PbLi temperature up to 350 °C, maximum PbLi flow rate with/without a magnetic field 15/50 l/min, maximum pressure head 0.15 MPa. The paper describes the loop itself and its major components, basic operation procedures, experience of handling PbLi, initial loop testing, flow diagnostics and current and near-future experiments. The obtained test results of the loop and its components have demonstrated that the new facility is fully functioning and ready for experimental studies of magnetohydrodynamic, heat and mass transfer phenomena in PbLi flows and also can be used in mock up testing in conditions relevant to fusion applications.

  13. Scientific management of the commissioning of the Temelin NPP

    International Nuclear Information System (INIS)

    Pazdera, F.; Vasa, I.; Svoboda, C.

    2002-01-01

    A Scientific Supervisory Group (SSG) for the commissioning of the Temelin nuclear power plant was set up by the statutory body of CEZ, a.s. (utility which holds responsibility for the start-up of the plant pursuant to Act No. 18/1997). The SSG provides support to the operator through expertise in nuclear safety assurance and nuclear power plant commissioning. Nuclear Research Institute Rez plc was appointed to this function. The article gives the definition and explains the statute of the SSG, highlights its main tasks and responsibilities, and presents the main results of activities of the SSG. The mission of the International Scientific Council for the Commissioning of the Temelin NPP is also briefly outlined. (author)

  14. LEIR commissioning successfully completed

    CERN Multimedia

    2006-01-01

    An important milestone has been passed in the preparation of the injector complex to supply ions to the LHC experiments. The LEIR lead-ion beam, seen on one of the control screens just before the PS injection region. The Low-Energy Ion Ring - LEIR for short - has passed its first tests with flying colours. On 12 May, the ring that will accumulate lead ions for the LHC was shut down after seven months of tests (see Bulletin 44/2005). 'The commissioning phase was a resounding success,' enthuses a satisfied Michel Chanel, head of the LEIR construction project. After several months of fine-tuning, the LEIR team has achieved its aim of producing the kind of beam required for first lead-ion collisions in the LHC in 2008. This involved creating bunches containing 230 million ions, in line with the specifications for those first beams. This success can be put down to the machine's outstanding design and components. 'It's a great achivement by all the teams involved in the machine's construction,' underlines Christian...

  15. Authorization procedure for the construction and operation of nuclear installations within the EC Member States, including supervision and control

    International Nuclear Information System (INIS)

    Amaducci, Sandro; Didier, J.M.

    1978-01-01

    This report is an updating of the report EUR 5284, Authorization procedure for the construction and operation of nuclear installations within the EEC Member States, prepared in 1974 by J.M. Didier and Associates. Recent developments regarding the authorization procedure for the construction and operation of nuclear installations have taken place in Italy (introduction of a site approval procedure) and in Denmark (adoption of an overall legislation on the subject, however not yet in force). With respect to supervision and control of nuclear installations during construction and operation, competences of, as well as their exercise by, supervisory authorities in all EC Member States, with the exception of Ireland, are also analysed in the current study

  16. Pickering dry storage - commissioning and initial operation

    International Nuclear Information System (INIS)

    Jonjev, S.

    1996-01-01

    Having commissioned all individual conventional and nuclear systems, the first Dry Storage Container (DSC) was loaded with four modules of 17 year cooled irradiated fuel (366 bundles) in the Auxiliary Irradiated Fuel Bay (AIFB) on November 29, 1995. After decontamination of the outer surface, and draining of water, the DSC was transported to the Used Fuel Dry Storage Facility (UFDSF) workshop, where it was vacuum dried, and then the lid was welded on. Following successful radiography test of the lid weld, the DSC was vacuum dried again and backfilled with Helium to a pressure of 930 mbar(a). The Helium leak test showed zero leakage (allowable leak rate is 1x10 -5 cc/sec). Finally, after loose contamination checks were performed and permanent safeguards seals were applied, the DSC was placed in the UFDSF storage area on January 23, 1996. Radiation fields at contact with the DSC surface were < 0.6 mrem/hr, and at the exterior surface of the storage building wall only 33 micro-rem/hr (far below the target of 250 micro-rem/hr). Therefore, the actual dose rates to general public (at the exclusion zone boundary) will be well below the design target of 1 % of the regulatory limit. (author). 3 refs., 2 tabs., 5 figs

  17. Pickering dry storage - commissioning and initial operation

    Energy Technology Data Exchange (ETDEWEB)

    Jonjev, S [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1997-12-31

    Having commissioned all individual conventional and nuclear systems, the first Dry Storage Container (DSC) was loaded with four modules of 17 year cooled irradiated fuel (366 bundles) in the Auxiliary Irradiated Fuel Bay (AIFB) on November 29, 1995. After decontamination of the outer surface, and draining of water, the DSC was transported to the Used Fuel Dry Storage Facility (UFDSF) workshop, where it was vacuum dried, and then the lid was welded on. Following successful radiography test of the lid weld, the DSC was vacuum dried again and backfilled with Helium to a pressure of 930 mbar(a). The Helium leak test showed zero leakage (allowable leak rate is 1x10{sup -5} cc/sec). Finally, after loose contamination checks were performed and permanent safeguards seals were applied, the DSC was placed in the UFDSF storage area on January 23, 1996. Radiation fields at contact with the DSC surface were < 0.6 mrem/hr, and at the exterior surface of the storage building wall only 33 micro-rem/hr (far below the target of 250 micro-rem/hr). Therefore, the actual dose rates to general public (at the exclusion zone boundary) will be well below the design target of 1 % of the regulatory limit. (author). 3 refs., 2 tabs., 5 figs.

  18. Project Guarantee 1985. Repository for high-level radioactive waste: construction and operation

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    An engineering project study aimed at demonstrating the feasibility of constructing a deep repository for high-level waste (Type C repository) has been carried out; the study is based on a model data-set representing typical geological and rock mechanical conditions as found outside the so-called Permocarboniferous basin in the regions under investigation by Nagra in Cantons Aargau, Schaffhausen, Solothurn and Zuerich. The repository is intended for disposal of high-level waste and any intermediate-level waste from re-processing in which the concentration of long-lived alpha-emitters exceeds the permissible limits set for a Type B repository. Final disposal of high-level waste is in subterranean, horizontally mined tunnels and of intermediate-level waste in underground vertical silos. The repository is intended to accomodate a total of around 6'000 HWL-cylinders (gross volume of around 1'200 m3) and around 10'000 m3 of intermediate-level waste. The total excavated volume is around 1'100'000 m3 and a construction time for the whole repository (up to the beginning of emplacement) of around 15 years is expected. For the estimated 50-year emplacement operations, a working team of around 60 people will be needed and a team of around 160 for the simultaneous tunnelling operations and auxiliary work. The project described in the present report permits the conclusion that construction of a repository for high-level radioactive waste and, if necessary, spent fuel-rods is feasible with present-day technology

  19. The U.S. Nuclear Regulatory Commission's antitrust review of nuclear power plants: the conditioning of licenses

    International Nuclear Information System (INIS)

    Penn, D.W.; Delaney, J.B.; Honeycutt, T.C.

    1976-04-01

    The 1970 amendments to Section 105 of the Atomic Energy Act require the Nuclear Regulatory Commission to conduct a prelicensing antitrust review of applications for licenses to construct and operate nuclear power plants. The Commission must make a finding as to whether the granting of a license 'would create or maintain a situation inconsistent with the antitrust laws,' and it has the authority to issue or continue a license, to refuse to issue a license, to rescind or amend a license, and to issue a license with conditions that it deems appropriate. This report provides information about the antitrust license conditions that have resulted from the NRC's antitrust review process. The process itself is described and a catalog of the applications requiring antitrust license conditions is presented. For each application, the license conditions are put into the general categories of unit access, transmission services, coordination, and contractual provisions. For completeness, the report also catalogs applications requiring no antitrust license conditions, and lists applications that were exempted from the 1970 amendments, are the subject of litigation, or have been withdrawn

  20. Commissioning and First Results from the Fermilab Cryomodule Test Stand

    Energy Technology Data Exchange (ETDEWEB)

    Harms, Elvin; et al.

    2017-05-01

    A new test stand dedicated to SRF cryomodule testing, CMTS1, has been commissioned and is now in operation at Fermilab. The first device to be cooled down and powered in this facility is the prototype 1.3 GHz cryomodule assembled at Fermilab for LCLS-II. We describe the demonstrated capabilities of CMTS1, report on steps taken during commissioning, provide an overview of first test results, and survey future plans.

  1. 78 FR 49782 - Interim Staff Guidance on Changes During Construction

    Science.gov (United States)

    2013-08-15

    ... Construction AGENCY: Nuclear Regulatory Commission. ACTION: Draft interim staff guidance; request for comment... During Construction.'' This ISG provides guidance to the NRC staff on the Preliminary Amendment Request...-ISG-025 ``Interim Staff Guidance on Changes during Construction under 10 CFR Part 52'' is available...

  2. Incentive regulation of nuclear power plants by state Public Utility Commissions

    International Nuclear Information System (INIS)

    Martin, R.L.; Olson, J.; Hendrickson, P.

    1989-12-01

    Economic performance incentives established by state Public Utility Commissions (PUCs) currently are applicable to the construction or operation of approximately 73 nuclear power reactors owned by 27 utilities with investment greater than 10% in 18 states. The NRC staff monitors development of the incentives and periodically provides an updated report on all nuclear plant incentives to its headquarters and regional offices. The staff maintains contact with the PUCs and the utilities responsible for implementing the incentives in order to obtain the updated information and to consider potential safety effects of the incentives. This report on incentive regulation of nuclear power plants by state PUCs presents the NRC staff's concerns on potential safety effects of economic performance incentives. It also includes a plant-by-plant survey that describes the mechanics of each incentive and discusses the financial effects of the incentive on the utility-owner(s) of the plant

  3. U.S. Nuclear Regulatory Commission fiscal year 1980 supplemental budget request

    International Nuclear Information System (INIS)

    1979-01-01

    The proposed supplemental will enable the Nuclear Regulatory Commission to implement necessary additional effort arising from the agency's assessment of the accident at the Three Mile Island Unit 2 facility on March 28, 1979. The TMI accident has had a major impact on all NRC program areas, in particular on research activities and reactor operations. In addition, funds are requested to enhance the agency's Waste Management program to reflect the recommendations of the President's Interagency Review Group on Waste Management. Specific activities involved in this effort will include developing regulatory guidance, developing a licensing review capability and completing a plan for the site characterization review, all in support of the preparation of NRC guidelines necessary to conduct a construction authorization review. FY 1980 appropriations did not include funds to cover these requirements. A detailed analysis across program lines of the supplemental request is contained in this report

  4. Commissioning of an APPLE-II Undulator at Daresbury Laboratory for the SRS

    CERN Document Server

    Clarke, James; Scott, Duncan; Shepherd, Ben; Wyles, Naomi

    2005-01-01

    A new variable polarisation undulator of the APPLE-II type has been designed and constructed at Daresbury Laboratory. Initial magnet testing of the 56mm period device was followed by an intensive period of shimming to improve the field quality. After this was successfully completed the undulator was installed into the SRS and tests made of the effect of the device upon the electron beam. This beam commissioning was completed in a very short space of time with the beamline being given full control of the gap and phase of the magnet within a few weeks of installation. This paper summarises the measurement of the magnet and the shimming techniques employed to improve the field quality. It also describes the effect of the device upon the stored 2 GeV electron beam and the measures taken to minimise these effects during user operations.

  5. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2004-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  6. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2003-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations. To be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources. And to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  7. Safety of nuclear power plants: Operation. Safety requirements

    International Nuclear Information System (INIS)

    2000-01-01

    The safety of a nuclear power plant is ensured by means of its proper siting, design, construction and commissioning, followed by the proper management and operation of the plant. In a later phase, proper decommissioning is required. This Safety Requirements publication supersedes the Code on the Safety of Nuclear Power Plants: Operation, which was issued in 1988 as Safety Series No. 50-C-O (Rev. 1). The purpose of this revision was: to restructure Safety Series No. 50-C-O (Rev. 1) in the light of the basic objectives, concepts and principles in the Safety Fundamentals publication The Safety of Nuclear Installations; to be consistent with the requirements of the International Basic Safety Standards for Protection against Ionizing Radiation and for the Safety of Radiation Sources; and to reflect current practice and new concepts and technical developments. Guidance on fulfillment of these Safety Requirements may be found in the appropriate Safety Guides relating to plant operation. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the basic objectives, concepts and principles that are presented in the Safety Fundamentals publication The Safety of Nuclear Installations. This publication deals with matters specific to the safe operation of land based stationary thermal neutron nuclear power plants, and also covers their commissioning and subsequent decommissioning

  8. Handbook for the design, selection, and construction of a rock cover for retired uranium-mill tailings

    International Nuclear Information System (INIS)

    Parker, G.B.

    1982-09-01

    As part of a Nuclear Regulatory Commission (NRC) study to assess the long-term protection of retired uranium mill tailings, the Pacific Northwest Laboratory (PNL) is developing a Handbook to guide the design, selection, and construction of a rock cover (riprap) for decommissioned and reclaimed uranium-mill tailings. The rock cover is designed for long-term protection of mill tailings from wind and water erosion. The purpose of the Handbook is twofold. First, it can be used as a manual by the uranium mill operators for designing, selecting, and constructing a rock cover. Second, the Handbook can be used as a guide to help the NRC evaluate the decommissioning and reclamation plans submitted to them by mill operators. Although the Handbook is not site-specific, it is structured to allow the design of a rock cover for any NRC-licensed tailings impoundment

  9. Environmental impact assessment of a package type IFAS reactor during construction and operational phases: a life cycle approach.

    Science.gov (United States)

    Singh, Nitin Kumar; Singh, Rana Pratap; Kazmi, Absar Ahmad

    2017-05-01

    In the present study, a life cycle assessment (LCA) approach was used to analyse the environmental impacts associated with the construction and operational phases of an integrated fixed-film activated sludge (IFAS) reactor treating municipal wastewater. This study was conducted within the boundaries of a research project that aimed to investigate the implementation related challenges of a package type IFAS reactor from an environmental perspective. Along with the LCA results of the construction phase, a comparison of the LCA results of seven operational phases is also presented in this study. The results showed that among all the inputs, the use of stainless steel in the construction phase caused the highest impact on environment, followed by electricity consumption in raw materials production. The impact of the construction phase on toxicity impact indicators was found to be significant compared to all operational phases. Among the seven operational phases of this study, the dissolved oxygen phase III, having a concentration of ∼4.5 mg/L, showed the highest impact on abiotic depletion, acidification, global warming, ozone layer depletion, human toxicity, fresh water eco-toxicity, marine aquatic eco-toxicity, terrestrial eco-toxicity, and photochemical oxidation. However, better effluent quality in this phase reduced the eutrophication load on environment.

  10. Energy Regulation Commission. Activity report. 1 July - 31 December 2008

    International Nuclear Information System (INIS)

    2009-01-01

    After a description of the scope of activities, organisation and operation of the CRE (Commission de Regulation de l'Energie, Energy regulation commission) and of the CorDIS (Comite de reglement des differents et des sanctions de la CRE, CRE's Committee for settlements of controversies and sanctions), this report outlines the importance of the grid manager independence and of the regulation reinforcement for the building up of a domestic energy market. It discusses the role of the regulation authority in the interconnection of European grids, their operation security and supply security, but also in pricing and in investments. It highlights the relationship between the reduction of carbon emission, energy demand management, strengthening of electric grids, financial incentives, and advanced metering systems. It describes how the CRE ensures a good operation of electricity and natural gas markets

  11. Final environmental impact statement, construction and operation of the Spallation Neutron Source Facility. Summary

    International Nuclear Information System (INIS)

    1999-04-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed, spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulator ring and a second target. This document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this FEIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. The No-Action Alternative describes the expected condition of the environment if no action were taken. Four siting alternatives for the Spallation Neutron Source are evaluated: Oak Ridge National Laboratory, Oak Ridge, TN, (preferred alternative); Argonne National Laboratory, Argonne, IL; Brookhaven National Laboratory, Upton, NY; and Los Alamos National Laboratory, Los Alamos, NM

  12. Final environmental impact statement, construction and operation of the Spallation Neutron Source. Volume 1

    International Nuclear Information System (INIS)

    1999-04-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed, spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulator ring and a second target. This document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this FEIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. The No-Action Alternative describes the expected condition of the environment if no action were taken. Four siting alternatives for the Spallation Neutron Source are evaluated: Oak Ridge National Laboratory, Oak Ridge, TN, (preferred alternative); Argonne National Laboratory, Argonne, IL; Brookhaven National Laboratory, Upton, NY; and Los Alamos National Laboratory, Los Alamos, NM

  13. The NRU blowdown test facility commissioning program

    Energy Technology Data Exchange (ETDEWEB)

    Walsworth, J A; Zanatta, R J; Yamazaki, A R; Semeniuk, D D; Wong, W; Dickson, L W; Ferris, C E; Burton, D H [Atomic Energy of Canada Ltd., Chalk River, ON (Canada). Chalk River Nuclear Labs.

    1990-12-31

    A major experimental program has been established at the Chalk River Nuclear Laboratories (CRL) that will provide essential data on the thermal and mechanical behaviour of nuclear fuel under abnormal reactor operating conditions and on the transient release, transport and deposition of fission product activity from severely degraded fuel. A number of severe fuel damage (SFD) experiments will be conducted within the Blowdown Test Facility (BTF) at CRL. A series of experiments are being conducted to commission this new facility prior to the SFD program. This paper describes the features and the commissioning program for the BTF. A development and testing program is described for critical components used on the reactor test section. In-reactor commissioning with a fuel assembly simulator commenced in 1989 June and preliminary results are given. The paper also outlines plans for future all-effects, in-reactor tests of CANDU-designed fuel. (author). 11 refs., 3 tabs., 7 figs.

  14. Design and commissioning of ReStoX for XENON1T

    Energy Technology Data Exchange (ETDEWEB)

    Scheibelhut, Melanie [Institut fuer Physik, Johannes Gutenberg Universitaet Mainz (Germany)

    2015-07-01

    The XENON1T experiment, currently under construction at the Gran Sasso underground laboratory LNGS, uses the concept of a xenon dual-phase (liquid/gas) time projection chamber to search for Dark Matter particles. This requires cooling to about 175 K and liquefaction of the noble gas. The ReStoX (Recovery and Storage of Xenon) is a novel device to store and recover up to 7 tons of xenon - either in liquid phase at cryogenic temperatures and 1-2 bar of pressure, or in gaseous form at room temperature at about 70 bar of pressure. The ReStoX system consists of a double insulated stainless steel sphere with liquid nitrogen cooling loops distributed across the inner sphere. A condenser on the inside, also operated with liquid nitrogen, provides a cooling power of 3 kW. ReStoX is designed to provide an effective means for various operating modes: to fill the TPC fast, to recover xenon from the TPC under normal and emergency conditions, to store xenon safely in liquid or gaseous form, or to remain in cold standby nearly empty as a safety device. Here we present the design and first commissioning results.

  15. The reorganisation of the French Atomic Energy Commission

    International Nuclear Information System (INIS)

    Glaize, G.

    1977-01-01

    The Atomic Energy Commission (CEA) has somewhat distinctive features when compared to other French public administrations. The Commission had been designed, when created in 1945, as a body very close to the Head of Government with, at the same time, great freedom of action; these two aspects demonstrated the importance accorded to its duties and the desire to assure its efficiency. The evolution of the Commission subsequently resulted in reducing these differences and strengthening the ministerial supervision as well as the role of the Administrator-General as compared with that of the High Commissioner. In the 1970s the Commission's structures developed in another direction, in view of the reorientation of its duties in the perspective of the development of the private nuclear sector and the increasing importance of nuclear safety questions. This reorganisation resulted in the creation of fairly autonomous operational units and a number of subsidiary bodies and specialised institutes. The outcome of this exercise has been to give the CEA a very diversified structure which is not as centralised as previously. (NEA) [fr

  16. European Commission and IAEA Celebrate 30 Years Co-operation on Nuclear Safeguards

    International Nuclear Information System (INIS)

    2011-01-01

    reprocessing plant in Japan and is now being installed in other facilities in Europe - Secure Sealing: During the last 30 years, the Seal and Identification Laboratory (SILab) of the JRC developed and produced ultrasonic bolt seals requested by the IAEA in order to seal underwater nuclear spent fuel assemblies. In 2011, after a training session at JRC in Ispra, Italy, a joint team of inspectors from the IAEA and EURATOM Safeguards and the European Commission's Directorate-General for Energy successfully sealed the first nuclear fuel bundles produced by the Cernavoda II reactor in Romania. Joint Research Centre (JRC): The JRC is the European Commission's in-house science service. Its mission is to provide customer-driven scientific and technical support for the conception, development, implementation and monitoring of European Union policies. The JRC serves the common interest of the Member States, while being independent of special interests, whether private or national. International Atomic Energy Agency (IAEA): The IAEA serves as the world's foremost intergovernmental forum for scientific and technical co-operation in the peaceful use of nuclear technology. Established as an autonomous organization under the United Nations (UN) in 1957, the IAEA carries out programmes to maximize the useful contribution of nuclear technology to society while verifying its peaceful use. (IAEA)

  17. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    CERN Document Server

    Bilki, Burak

    2017-01-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I upgrade was performed during the Extended Year End Technical Stop of 2016 and 2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics were also upgraded to QIE10-based electronics which implement larger dynamic range and a 6-bit TDC. Following this major upgrade, the Hadron Forward Calorimeters were commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  18. Commissioning of the CMS Hadron Forward Calorimeters Phase I Upgrade

    Science.gov (United States)

    Bilki, B.; Onel, Y.

    2018-03-01

    The final phase of the CMS Hadron Forward Calorimeters Phase I Upgrade was performed during the Extended Year End Technical Stop of 2016-2017. In the framework of the upgrade, the PMT boxes were reworked to implement two channel readout in order to exploit the benefits of the multi-anode PMTs in background tagging and signal recovery. The front-end electronics were also upgraded to QIE10-based electronics which implement larger dynamic range and a 6-bit TDC. Following this major upgrade, the Hadron Forward Calorimeters were commissioned for operation readiness in 2017. Here we describe the details and the components of the upgrade, and discuss the operational experience and results obtained during the upgrade and commissioning.

  19. New NPP Construction Experience in Finland

    International Nuclear Information System (INIS)

    Alm-Lytz, K.

    2016-01-01

    The paper discusses the experiences of the new nuclear power plant construction projects. The topics include the licensing and regulatory oversight process, completion of the design prior to construction, experience and know-how of the participating organisations, quality management in a nuclear construction project, safety culture aspects in a nuclear construction project, and the role and importance of regulator’s oversight. Finland has recent experience of new nuclear power plant construction, one plant unit being under construction close to commissioning phase and one plant unit in construction license phase. Each nation is solely responsible for the safety of its nuclear installations. Therefore, there are also national practices how nuclear power plants are licensed and how the safety and quality of these plants are verified during construction and operation. Differences in licensing, regulations and regulatory practices may have an impact on the design of the plant. There may be differences in how the detailed design has to be documented and how and when it needs to be submitted for approval to the regulator. To avoid surprises due to differences, it is beneficial for the owner and plant vendor to familiarize themselves early enough on the national practices and regulations to ensure that regulatory expectations and processes can be taken into account in the project implementation. In addition, the owner and the plant vendor have to understand what are the national safety goals and safety requirements that the plant has to fulfil, and what they mean to the detailed design of the plant. These have to be clarified and explicitly defined by the owner in terms of design criteria in the bidding documentation to avoid difficulties in the future steps of the project.

  20. The ALICE Transition Radiation Detector: Construction, operation, and performance

    Science.gov (United States)

    Alice Collaboration

    2018-02-01

    The Transition Radiation Detector (TRD) was designed and built to enhance the capabilities of the ALICE detector at the Large Hadron Collider (LHC). While aimed at providing electron identification and triggering, the TRD also contributes significantly to the track reconstruction and calibration in the central barrel of ALICE. In this paper the design, construction, operation, and performance of this detector are discussed. A pion rejection factor of up to 410 is achieved at a momentum of 1 GeV/ c in p-Pb collisions and the resolution at high transverse momentum improves by about 40% when including the TRD information in track reconstruction. The triggering capability is demonstrated both for jet, light nuclei, and electron selection.

  1. Mitigation for the Construction and Operation of Libby Dam, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2002-09-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.

  2. Environmental assessment for construction and operation of a Human Genome Laboratory at Lawrence Berkeley Laboratory, Berkeley, California

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    Lawrence Berkeley Laboratory (LBL) proposes to construct and operate a new laboratory for consolidation of current and future activities of the Human Genome Center (HGC). This document addresses the potential direct, indirect, and cumulative environmental and human-health effects from the proposed facility construction and operation. This document was prepared in accordance the National Environmental Policy Act of 1969 (United States Codes 42 USC 4321-4347) (NEPA) and the US Department of Energy`s (DOE) Final Rule for NEPA Implementing Procedures [Code of Federal Regulations 10CFR 1021].

  3. 77 FR 43488 - Continuity of Operations Plan

    Science.gov (United States)

    2012-07-25

    ...; Order No. 765] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION... Operations Plan to allow the Commission the discretion to better address not only long-term and catastrophic... discretion regarding: the activation and deactivation of the Continuity of Operations Plan and any suspension...

  4. Automated Execution and Tracking of the LHC Commissioning Tests

    CERN Document Server

    Fuchsberger, K; Galetzka, M; Gorbonosov, R; Pojer, M; Solfaroli Camillocci, M; Zerlauth, M

    2012-01-01

    To ensure the correct operation and prevent system failures, which can lead to equipment damage in the worst case, all critical systems in the Large Hadron Collider (LHC), among them the superconducting circuits, have to be tested thoroughly during dedicated commissioning phases after each intervention. In view of the around 7,000 individual tests to be performed each year after a Christmas stop, a lot of effort was already put into the automation of these tests at the beginning of LHC hardware commissioning in 2005, to assure the dependable execution and analysis of these tests. To further increase the productivity during the commissioning campaigns and to enforce a more consistent workflow, the development of a dedicated testing framework was launched. This new framework is designed to schedule and track the automated tests for all systems of the LHC and will also be extendable, e.g., to beam commissioning tests. This is achieved by re-using different, already existing execution frameworks. In this paper, w...

  5. Case study of restaurant successfully designed, constructed, and operated for excellent dining acoustics

    Science.gov (United States)

    Bollard, Paul; Des Jardins, Stephen

    2005-09-01

    Prior to the construction of La Provence Restaurant in Roseville, California in 2004, the owner, Stephen Des Jardins, traveled with his cook, architect, and engineer to the Provence Region of France to study the cuisine, architecture, and acoustics of the local restaurants. This information was incorporated into the design, construction, and operation of his restaurant, with acoustical design assistance provided by the author, Paul Bollard. The result of the owner's painstaking attention to detail is a restaurant which has received very positive reviews for its architecture, quality of food, service, and acoustic ambience. This paper documents the measures included in the construction of the restaurant to ensure that the building acoustics enhance the dining experience, rather than detract from it. Photographs of acoustic treatments are included, as are reverberation time (RT60) test results and ambient noise level measurement results.

  6. Construction of the neutron beam facility at Australia's OPAL research reactor

    International Nuclear Information System (INIS)

    Kennedy, Shane J.

    2006-01-01

    Australia's new research reactor, OPAL, has been designed principally for neutron beam science and radioisotope production. It has a capacity for 18 neutron beam instruments, located at the reactor face and in a neutron guide hall. The neutron beam facility features a 20 l liquid deuterium cold neutron source and cold and thermal supermirror neutron guides. Nine neutron beam instruments are under development, of which seven are scheduled for completion in early 2007. The project is approaching the hot-commissioning stage, when criticality will be demonstrated. Installation of the neutron beam transport system and neutron beam instruments in the neutron guide hall and at the reactor face is underway, and the path to completion of this project is relatively clear. This paper will outline the key features of the OPAL reactor, and will describe the neutron beam facility in particular. The status of the construction and a forecast of the program to completion, including commissioning and commencement of routine operation in 2007 will also be discussed

  7. The role of the Nuclear Regulatory Commission in the management of nuclear waste

    International Nuclear Information System (INIS)

    Thompson, H.L. Jr.

    1988-01-01

    In general, the US Nuclear Regulatory Commission (NRC) is responsible for reviewing and making licensing decisions to ensure that the US Department of Energy's (DOE's) high-level waste repository is designed, constructed, and operated without unreasonable risk to public health and safety. In implementing this responsibility, however, the commission's guidance to the staff is that, in the absence of unresolved safety concerns, the NRC regulatory program will not delay the executive branch's program as set forth in the DOE project decision schedule. The NRC role for the next several years will be to develop its licensing framework and to consult with DOE on its plans. An essential ingredient in the success of both NRC's and DOE's respective missions is the need for free and open exchange of information, which will assure us that the concerns of all parties are addressed. With regard to low-level radioactive waste, the states have the lead responsibility for disposal. The NRC also provides assistance to the states and compacts on such items as regulatory programs, site characterization, and mixed waste disposal. Another of the NRC's roles is in the management of uranium mill tailings. Currently, most of the NRC's attention is focused on ensuring adequate long-term stabilization of tailings

  8. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  9. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  10. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  11. A study on the operator's errors of commission (EOC) in accident scenarios of nuclear power plants: methodology development and application

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Whan; Jung, Won Dea; Park, Jin Kyun; Kang, Da Il

    2003-04-01

    As the concern on the operator's inappropriate interventions, the so-called Errors Of Commission (EOCs), that can exacerbate the plant safety has been raised, much of interest in the identification and analysis of EOC events from the risk assessment perspective has been increased. Also, one of the items in need of improvement for the conventional PSA and HRA that consider only the system-demanding human actions is the inclusion of the operator's EOC events into the PSA model. In this study, we propose a methodology for identifying and analysing human errors of commission that might be occurring from the failures in situation assessment and decision making during accident progressions given an initiating event. In order to achieve this goal, the following research items have been performed: Firstly, we analysed the error causes or situations contributed to the occurrence of EOCs in several incidents/accidents of nuclear power plants. Secondly, limitations of the advanced HRAs in treating EOCs were reviewed, and a requirement for a new methodology for analysing EOCs was established. Thirdly, based on these accomplishments a methodology for identifying and analysing EOC events inducible from the failures in situation assessment and decision making was proposed and applied to all the accident sequences of YGN 3 and 4 NPP which resulted in the identification of about 10 EOC situations.

  12. Performance of the SRRC storage ring and wiggler commissioning

    International Nuclear Information System (INIS)

    Kuo, C.C.; Hsu, K.T.; Luo, G.H.

    1995-01-01

    A 1.3 GeV synchrotron radiation storage ring at SRRC has been operated for more than a year since October 1993. Starting from April 1994, the machine has been open to the user community. In February 1995, the authors installed a wiggler magnet of 1.8 tesla 25-pole in the ring and successfully commissioned. The machine was scheduled for the users' runs from the middle of April this year. The authors describe the performance of the machine without wiggler magnet system and then report the wiggler effects on the beam dynamics of the storage ring, e.g., tune shift, beta-beating, orbit change, nonlinear dynamics effect, etc. Some measurements are compared with the model prediction and agreement between them was fairly good. Possible actions to minimize wiggler effects have been taken, such as orbit correction as a function wiggler gap change. The machine improvement projects, such as longitudinal and transverse damping systems as well as orbit stability feedback system are under construction and will be in use soon

  13. Use of Torness simulator as a design and commissioning tool

    International Nuclear Information System (INIS)

    Hamilton, J.; Hacking, D.

    1989-01-01

    Real-time replica control room simulators are now in general use for the training of nuclear power plant operators, and the almost universal trend towards accurate physics-based plant models and detailed operator interface has opened up interesting and valuable engineering applications. This paper discusses the use of the Torness AGR Simulator in its dual role of commissioning support tool and operator training facility. (author)

  14. Vertex operator construction of superconformal ghosts and string field theory

    International Nuclear Information System (INIS)

    Ezawa, Z.F.; Nakamura, S.; Tezuka, A.

    1987-01-01

    Superconformal ghosts in string theories are characterized by the SU(1,1) Kac-Moody algebra with central charge -1/2. These ghost fields are constructed as the vertex operators realizing spinor representations of the Kac-Moody algebra. Representations of the canonical commutation relations of the superconformal ghosts are analyzed extensively. All irreducible representations are found to possess only the trivial inner product but for one exceptional case. Consequently, in superstring field theory it is necessary to consider reducible representations in general. Hilbert spaces with a non-trivial inner product are explicitly obtained upon which second quantization of superstring may be carried out. (orig.)

  15. Commissioning of specialist palliative care services in England.

    Science.gov (United States)

    Lancaster, Harriet; Finlay, Ilora; Downman, Maxwell; Dumas, James

    2018-03-01

    Some failures in end-of-life care have been attributed to inconsistent provision of palliative care across England. We aimed to explore the variation in commissioning of services by Clinical Commissioning Groups (CCGs) using a data collection exercise. We sent a Freedom of Information request in the form of an open questionnaire to all 209 CCGs in England to assess their commissioning of palliative and end-of-life care services, mainly focused on the provision of specialist palliative care services. 29 CCGs provided information about the number of patients with some form of palliative care needs in their population. For specialist palliative care services, CCGs allocated budgets ranging from £51.83 to £2329.19 per patient per annum. 163 CCGs (77.90%) currently commission 7-day admission to their specialist palliative care beds. 82.84% of CCGs commission 7-day specialist palliative care services in patients' own homes and out-of-hours services rely heavily on hospice provision. 64 CCGs (31.37%) commission pain control teams, the majority of whom only operate in regular working hours. 68.14% of CCGs reported commissioning palliative care education of any sort for healthcare professionals and 44.85% of CCGs had no plans to update or review their palliative care services. The most important finding from this exercise is that the information CCGs hold about their population and services is not standardised. However, information based on data that are more objective, for example, population and total budget for palliative care, demonstrate wide variations in commissioning. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/.

  16. Making the error-controlling algorithm of observable operator models constructive.

    Science.gov (United States)

    Zhao, Ming-Jie; Jaeger, Herbert; Thon, Michael

    2009-12-01

    Observable operator models (OOMs) are a class of models for stochastic processes that properly subsumes the class that can be modeled by finite-dimensional hidden Markov models (HMMs). One of the main advantages of OOMs over HMMs is that they admit asymptotically correct learning algorithms. A series of learning algorithms has been developed, with increasing computational and statistical efficiency, whose recent culmination was the error-controlling (EC) algorithm developed by the first author. The EC algorithm is an iterative, asymptotically correct algorithm that yields (and minimizes) an assured upper bound on the modeling error. The run time is faster by at least one order of magnitude than EM-based HMM learning algorithms and yields significantly more accurate models than the latter. Here we present a significant improvement of the EC algorithm: the constructive error-controlling (CEC) algorithm. CEC inherits from EC the main idea of minimizing an upper bound on the modeling error but is constructive where EC needs iterations. As a consequence, we obtain further gains in learning speed without loss in modeling accuracy.

  17. Radiation Protection Institute,Ghana Atomic Energy Commission: Annual Report 2014

    International Nuclear Information System (INIS)

    2014-01-01

    The Radiation Protection Institute of the Ghana Atomic Energy Commission was established to provide scientific and technical support for executing the operational functions of the Radiation Protection Board. The 2014 Annual Report highlights the operational activities of Institutes. Also presented is a list of research projects, publications and abstracts of technical reports.

  18. A DirtI Application for LBT Commissioning Campaigns

    Science.gov (United States)

    Borelli, J. L.

    2009-09-01

    In order to characterize the Gregorian focal stations and test the performance achieved by the Large Binocular Telescope (LBT) adaptive optics system, two infrared test cameras were constructed within a joint project between INAF (Observatorio Astronomico di Bologna, Italy) and the Max Planck Institute for Astronomy (Germany). Is intended here to describe the functionality and successful results obtained with the Daemon for the Infrared Test Camera Interface (DirtI) during commissioning campaigns.

  19. Translating landscape: the Colombian Chorographic Commission

    Directory of Open Access Journals (Sweden)

    Veronica Uribe Hanabergh

    2014-01-01

    Full Text Available In 1850 the Colombian government developed a project to survey the young country´s landscape. Scientists, writers, and artists were invited to make part of the project led by the Italian military, geographer and cartographer, Agustin Codazzi. After nine years and three different artists, the Commission had many watercolor drawings that portrayed a landscape, not only in its physical traits, but also in its social, economic and agricultural development. Through the lens of these artists, the drawings that concluded the survey showed a landscape that was truly original but that was also seen through the lens of a certain romantic eye inherited by a firm European legacy. As a result, these watercolors show the different regions, people, and means of transportation, crops and trades. The Colombian Chorographic Commission was an important project in the construction of the Colombian modern nation, a country that was constantly divided by federalist and centralist politics, liberal and conservative parties. An interesting union between science, politics and art, these drawings represent the process of the modernization of nineteenth-century Colombia.

  20. Projected costs of generating electricity from power stations for commissioning in the period 1995-2000

    International Nuclear Information System (INIS)

    1989-01-01

    The study reviews the projected electricity generation costs for the base load power generation options expected to be available in the medium term, using an agreed common economic methodology. Cost projections were obtained for nuclear and fossil fuelled plants that could in principle be commissioned in the mid-1990s, or shortly thereafter, although not all countries plan to commission plants at that time. The major changes in expectations compared with earlier studies, apart from those associated with changed perceptions of fossil fuel prices, include significantly lower nuclear investment costs for the United States, associated with an improved design and the expectation of achieving shorter construction periods than projected in the 1985 study, and generally lower nuclear fuel costs. Some countries project higher operation and maintenance costs for either coal-fired or nuclear plant or both. In the case of coal-fired plants these may be associated with the extra costs of operating desulphurisation equipment. The most marked change in nuclear operating and maintenance costs has taken place in the United States, where these costs are now expected to be twice as large as the projected nuclear fuel costs. There remain major differences in investment cost expectations between countries. The reasons for these differences have been examined in previous studies. They arise from differences in factor costs, regulatory approach, design and siting, and exchange rates which do not adequately reflect the differences in the capital investment costs between countries. In brief, most OECD countries continue to expect nuclear power to have a lower levelised generating cost than coal-fired generation when using their own technical and economic assumptions

  1. An introduction to the design, commissioning and operation of nuclear air cleaning systems for Qinshan Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Xinliang Chen; Jiangang Qu; Minqi Shi [Shanghai Nuclear Engineering Research and Design Institute (China)] [and others

    1995-02-01

    This paper introduces the design evolution, system schemes and design and construction of main nuclear air cleaning components such as HEPA filter, charcoal adsorber and concrete housing etc. for Qinshan 300MW PWR Nuclear Power Plant (QNPP), the first indigenously designed and constructed nuclear power plant in China. The field test results and in-service test results, since the air cleaning systems were put into operation 18 months ago, are presented and evaluated. These results demonstrate that the design and construction of the air cleaning systems and equipment manufacturing for QNPP are successful and the American codes and standards invoked in design, construction and testing of nuclear air cleaning systems for QNPP are applicable in China. The paper explains that the leakage rate of concrete air cleaning housings can also be assured if sealing measures are taken properly and embedded parts are designed carefully in the penetration areas of the housing and that the uniformity of the airflow distribution upstream the HEPA filters can be achieved generally no matter how inlet and outlet ducts of air cleaning unit are arranged.

  2. Performance updates of HAWK-I and preparation for the commissioning of the system GRAAL+HAWK-I

    Science.gov (United States)

    Hibon, Pascale; Paufique, Jerome; Kuntschner, Harald; Dobrzycka, Danuta; Le Louarn, Miska; Valenti, Elena; Neeser, Mark; Pompei, Emanuela; Arsenault, Robin; Siebenmorgen, Ralf; Madec, Pierre-Yves; Petr-Gotzens, Monika; La Fuente, Carlos; Urrutia, Josefina; Valenzuela, Javier; Castillo, Roberto; Baksai, Pedro; Garcia Dabo, Cesar Enrique; Jost, Andreas; Argomedo, Javier; Kolb, Johann; Kiekebusch, Mario; Hubin, Norbert; Duhoux, Philippe; Conzelmann, Ralf Dieter; Donaldson, Robert; Tordo, Sebastien; Huber, Stefan

    2016-08-01

    The High Acuity Wide field K-band Imager (HAWK-I) instrument is a cryogenic wide field imager operating in the wavelength range 0.9 to 2.5 microns. It has been in operations since 2007 on the UT4 at the Very Large Telescope Observatory in seeing-limited mode. In 2017-2018, GRound Layer Adaptive optics Assisted by Lasers module (GRAAL) will be in operation and the system GRAAL+HAWK-I will be commissioned. It will allow: deeper exposures for nearly point-source objects, or shorter exposure times for reaching the same magnitude, and/or deeper detection limiting magnitude. With GRAAL, HAWK-I will operate more than 80% of the time with an equivalent K-band seeing of 0.55" (instead of 0.7" without GRAAL). GRAAL is already installed and the operations without adaptive optics were commissioned in 2015. We discuss here the latest updates on performance from HAWK-I without Adaptive Optics (AO) and the preparation for the commissioning of the system GRAAL+HAWK-I.

  3. Construction and operation of the Spallation Neutron Source: Draft environmental impact statement. Volume 2

    International Nuclear Information System (INIS)

    1998-12-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulation ring and a second target. Volume 1 of this document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this EIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. This volume contains the following appendices: (A) SNS accident source terms for EIS input; (B) Reports on the selection of alternative sites for the SNS; (C) Letters of consultation on protected species and cultural resources; (D) Ecological resource survey reports and summaries; (E) Descriptions of ORNL research projects in the Walker Branch Watershed; (F) Atmospheric dispersion and dose calculations for normal and accident conditions; (G) Projected air quality modeling effects at NOAA's Walker Branch Monitoring Tower

  4. A review of the program of the Office of the Commission for the Management of Road Traffic

    Energy Technology Data Exchange (ETDEWEB)

    Saraswadi, K.

    1995-12-31

    This report describes the development of a Mass Rapid Transit Systems Master Plan by the Office for the Commission of Road Traffic (OCMRT) for Bangkok as detailed in the full Master Plan document. The Master Plan document addresses the following topic areas: evolution of the Master Plan Concept; socio-economic and development benefits; transport model development and applications; ridership findings; environmental considerations; capital and operating costs; economic and financial analysis findings; priority projects and construction program phasing; and implementation of the Master Plan - institutional issues. Each of these topics is discussed in further detail in its own chapter in the document. For purposes of this workshop and subsequent proceedings, the last section is highlighed in this presentation.

  5. Commissioning of Fermilab's Electron Cooling System for 8-GeV Antiprotons

    CERN Document Server

    Nagaitsev, Sergei; Burov, Alexey; Carlson, Kermit; Gai, Wei; Gattuso, Consolato; Hu, Martin; Kazakevich, Grigory; Kramper, Brian J; Kroc, Thomas K; Leibfritz, Jerry; Prost, Lionel; Pruss, Stanley M; Saewert, Greg W; Schmidt, Chuck; Seletsky, Sergey; Shemyakin, Alexander V; Sutherland, Mary; Tupikov, Vitali; Warner, Arden

    2005-01-01

    A 4.3-MeV electron cooling system has been installed at Fermilab in the Recycler antiproton storage ring and is being currently commissioned. The cooling system is designed to assist accumulation of 8.9-GeV/c antiprotons for the Tevatron collider operations. This paper will report on the progress of the electron beam commissioning effort as well as on detailed plans of demonstrating the cooling of antiprotons.

  6. Full scope simulator commissioning and training experience at Cernavoda NPP

    International Nuclear Information System (INIS)

    Balan, M.

    2000-01-01

    The paper presents the experience gained during commissioning and the initial use of the CANDU training full-scope simulator for operation personnel at Cernavoda NPP. The full-scope simulator as an integral part of the training programs that take place in Cernavoda Nuclear Training Department (CNTD), is mainly used for the development of operational skills, knowledge and attitudes required to operate the plant in a safe and efficient manner. (author)

  7. Systematization of the major stages of the client in certain branches of construction production

    Directory of Open Access Journals (Sweden)

    Kuzmina Tatyana

    2016-01-01

    Full Text Available The article contains substantiation of the need for investment and construction projects in various sectors of the construction production. On the basis of domestic and foreign experience it describes the concept of the client (customer and his functions and tasks in the implementation of such projects. It also systematizes the main stages of the customer’s activities, which are presented as a preparation for the construction, development of construction sites, monitoring the progress of the construction, commis-sioning and commissioning of facilities. There is also a determination of time intervals at each stage, the final formula for calculating the duration of the investment project due to the given the shared stages. The article also gives optimization variants in some sectors of construction production.

  8. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    International Nuclear Information System (INIS)

    Dorr, Kent A.; Ostrom, Michael J.; Freeman-Pollard, Jhivaun R.

    2012-01-01

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W PandT) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012

  9. Lessons Learned From The 200 West Pump And Treatment Facility Construction Project At The US DOE Hanford Site - A Leadership For Energy And Environmental Design (LEED) Gold-Certified Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dorr, Kent A. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Ostrom, Michael J. [CH2M HILL Plateau Remediation Company, Richland, WA (United States); Freeman-Pollard, Jhivaun R. [CH2M HILL Plateau Remediation Company, Richland, WA (United States)

    2012-11-14

    CH2M Hill Plateau Remediation Company (CHPRC) designed, constructed, commissioned, and began operation of the largest groundwater pump and treatment facility in the U.S. Department of Energy's (DOE) nationwide complex. This one-of-a-kind groundwater pump and treatment facility, located at the Hanford Nuclear Reservation Site (Hanford Site) in Washington State, was built in an accelerated manner with American Recovery and Reinvestment Act (ARRA) funds and has attained Leadership in Energy and Environmental Design (LEED) GOLD certification, which makes it the first non-administrative building in the DOE Office of Environmental Management complex to earn such an award. There were many contractual, technical, configuration management, quality, safety, and LEED challenges associated with the design, procurement, construction, and commissioning of this $95 million, 52,000 ft groundwater pump and treatment facility. This paper will present the Project and LEED accomplishments, as well as Lessons Learned by CHPRC when additional ARRA funds were used to accelerate design, procurement, construction, and commissioning of the 200 West Groundwater Pump and Treatment (2W P&T) Facility to meet DOE's mission of treating contaminated groundwater at the Hanford Site with a new facility by June 28, 2012.

  10. LIPAc personnel protection system for realizing radiation licensing conditions on injector commissioning with deuteron beam

    Energy Technology Data Exchange (ETDEWEB)

    Takahashi, Hiroki, E-mail: takahashi.hiroki@jaea.go.jp [IFMIF/EVEDA Accelerator Group, Japan Atomic Energy Agency (JAEA), Rokkasho, Aomori (Japan); Narita, Takahiro; Kasugai, Atsushi [IFMIF/EVEDA Accelerator Group, Japan Atomic Energy Agency (JAEA), Rokkasho, Aomori (Japan); Kojima, Toshiyuki [Gitec Co. Ltd., Hachinohe, Aomori (Japan); Marqueta, Alvaro; Nishiyama, Koichi [IFMIF/EVEDA Project Team, Rokkasho, Aomori (Japan); Sakaki, Hironao [Quantum Beam Science Center, JAEA, Kizu, Kyoto (Japan); Gobin, Raphael [Commissariat à l’Energie Atomique et aux Energies Alternatives, CEA/Saclay, DSM/IRFU, Gif/Yvette (France)

    2016-11-01

    Highlights: • Personnel Protection System (PPS) is developed to adapt the radiation licensing. • PPS achieves the target performance to secure the personnel safety. • Pulse Duty Management System (PDMS) is developed to manage the beam-operation-time. • Satisfying performance of PDMS is confirmed by injector operation with H+ beam. • By the result of PPS and PDMS tests, the radiation license was successfully obtained. - Abstract: The performance validation of the Linear IFMIF Prototype Accelerator (LIPAc), up to the energy of 9 MeV deuteron beam with 125 mA continuous wave (CW), is planned in Rokkasho, Japan. There are three main phases of LIPAc performance validation: Injector commissioning, RFQ commissioning and LIPAc commissioning. Injector commissioning was started by H{sup +} and D{sup +} beam. To apply the radiation licensing for the Injector commissioning, the entering/leaving to/from accelerator vault should be under control, and access to the accelerator vault has to be prohibited for any person during the beam operation. The Personnel Protection System (PPS) was developed to adapt the radiation licensing conditions. The licensing requests that PPS must manage the accumulated D{sup +} current. So, to manage the overall D{sup +} beam time during injector operation, Pulse Duty Management System (PDMS) was developed as a configurable subsystem as part of the PPS. The PDMS was tested during H{sup +} beam (as simulated D{sup +}) operation, to confirm that it can handle the beam inhibit from Injector before the beam accumulation is above the threshold value specified in the radiation licensing condition. In this paper, the design and configuration of these systems and the result of the tests are presented.

  11. A.S.N. regulation of Flamanville 3 EPR construction

    International Nuclear Information System (INIS)

    Limousin, S.

    2009-01-01

    The EPR authorization decree for Flamanville 3 was issued by the French government (decree no. 2007-534) on the 10 April 2007. The construction activities are going on in the manufacturer workshops and at Flamanville site. The decree published in November 2007, and related to the so called TSN law (the nuclear transparency and safety nuclear law published in 2006), specifies that the commissioning licence (the agreement for first fuel load) has to be granted by an ASN decision on the basis of the assessment of the demonstration of the plant safety. In this aim, one part of ASN's work is to review, with its technical sup-port organisation (IRSN), the reactor construction in order to appreciate the safety level of the construction activities. This paper describes ASN's strategy for the regulation of Flamanville 3 EPR construction activities, endorsed by ASN commission at the end of November 2007, and the main events which have occurred on Flamanville site since the beginning of the construction. The article presents the main ASN conclusions of this regulation at this time. (author)

  12. Swiss Federal Energy Research Commission - Annual report 2009

    International Nuclear Information System (INIS)

    Maus, K.

    2010-02-01

    This annual report for the Swiss Federal Office of Energy (SFOE) provides an overview of the work carried out by the Swiss Federal Energy Research Commission CORE in 2009. The commission's main work included preparation work for the revised energy research concept for the period 2013 - 2016, a review of all research programmes operated by the Swiss Federal Office of Energy SFOE, the enhancement of cooperation with public and private research and promotion institutions, the coordination and consultation of research institutions and the improvement of international information exchange. The report summarises coordination work with the many CORE programmes and defines strategic main areas of interest for future work

  13. RHIC BEAM ABORT KICKER POWER SUPPLY SYSTEM COMMISSIONING EXPERIENCE AND REMAINING ISSUES

    International Nuclear Information System (INIS)

    ZHANG, W.; AHRENS, L.A.; MI, J.; OERTER, B.; SANDERS, R.; SANDBERG, J.

    2001-01-01

    The RHIC Beam Abort Kicker Power Supply Systems commissioning experience and the remaining issues will be reported in this paper. The RHIC Blue Ring Beam Abort Kicker Power Supply System initial commissioning took place in June 1999. Its identical system in Yellow Ring was brought on line during Spring 2000. Each of the RHIC Beam Abort Kicker Power Supply Systems consists of five high voltage modulators and subsystems. These systems are critical devices for RHIC machine protection and environmental protection. They are required to be effective, reliable and operating with sufficient redundancy to safely abort the beam to its beam dump at the end of accumulation or at any time when they are commanded. To deflect 66 GeV ion beam to the beam absorbers, the RHIC Beam Abort Kicker Power Supply Systems were operated at 22 kV level. The RHIC 2000 commissioning run was very successful

  14. ITER operating limit definition criteria

    International Nuclear Information System (INIS)

    Ciattaglia, S.; Barabaschi, P.; Carretero, J.A.; Chiocchio, S.; Hureau, D.; Girard, J.Ph.; Gordon, C.; Portone, A.; Rodrigo, L. Rodriguez; Roldan, C.; Saibene, G.; Uzan-Elbez, J.

    2009-01-01

    The operating limits and conditions (OLCs) are operating parameters and conditions, chosen among all system/components, which, together, define the domain of the safe operation of ITER in all foreseen ITER states (operation, maintenance, commissioning). At the same time they are selected to guarantee the required operation flexibility which is a critical factor for the success of an experimental machine such as ITER. System and components that are important for personnel or public safety (safety important class, SIC) are identified considering their functional importance in the overall plant safety analysis. SIC classification has to be presented already in the preliminary safety analysis report and approved by the licensing authority before manufacturing and construction. OLCs comprise the safety limits that, if exceeded, could result in a potential safety hazard, the relevant settings that determine the intervention of SIC systems, and the operational limits on equipment which warn against or stop a functional deviation from a planned operational status that could challenge equipment and functions. Some operational conditions, e.g. in-Vacuum Vessel (VV) radioactive inventories, will be controlled through procedures. Operating experience from present tokamaks, in particular JET, and from nuclear plants, is considered to the maximum possible extent. This paper presents the guidelines for the development of the ITER OLCs with particular reference to safety limits.

  15. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  16. LHC Damper Beam commissioning in 2010

    CERN Document Server

    Höfle, W; Schokker, M; Valuch, D

    2011-01-01

    The LHC transverse dampers were commissioned in 2010 with beam and their use at injection energy of 450 GeV, during the ramp and in collisions at 3.5 TeV for Physics has become part of the standard operations pro- cedure. The system proved important to limit emittance blow-up at injection and to maintain smaller than nominal emittances throughout the accelerating cycle. We describe the commissioning of the system step-by-step as done in 2010 and summarize its performance as achieved for pro- ton as well as ion beams in 2010. Although its principle function is to keep transverse oscillations under control, the system has also been used as an exciter for abort gap clean- ing and tune measurement. The dedicated beam position measurement system with its low noise properties provides additional possibilities for diagnostics.

  17. Advanced construction methods for new nuclear power plants

    International Nuclear Information System (INIS)

    Bilbao y Leon, Sama; Cleveland, John; Moon, Seong-Gyun; Tyobeka, Bismark

    2009-01-01

    The length of the construction and commissioning phases of nuclear power plants have historically been longer than for conventional fossil fuelled plants, often having a record of delays and cost overruns as a result from several factors including legal interventions and revisions of safety regulations. Recent nuclear construction projects however, have shown that long construction periods for nuclear power plants are no longer the norm. While there are several inter-related factors that influence the construction time, the use of advanced construction techniques has contributed significantly to reducing the construction length of recent nuclear projects. (author)

  18. Installation, Commissioning and startup of the CMS experiment

    CERN Multimedia

    CERN. Geneva

    2008-01-01

    Will outline the construction phases of CMS, followed by specific strategy used by CMS to commission the experiment concurrently with the installation in the cavern. All along examples of the performance of the detector obtained mainly from cosmic ray data will be shown. At the end some example of early physics result aimed for the 2008 LHC run will be shown. Prerequisite knowledge: Some knowledge of basic particle detectors will make it easier to follow the talk.

  19. Beams dynamics optimisation of LINAC4 structures for increased operational flexibility

    CERN Document Server

    Bellodi, G; Garcia Tudela, M; Hein, L M; Lallement, J B; Lombardi, A M; Posocco, P A; Sargsyan, E; Stovall, J

    2010-01-01

    Linac4 is a new 160 MeV, 40 mA pulsed beam current H- accelerator which will be the source of particles for all proton accelerators at CERN. Construction started in October 2008, and beam commissioning of the 3 MeV front-end is scheduled for early next year. A baseline design of the linac beam dynamics was completed 2 years ago and validated by a systematic campaign of transverse and longitudinal error studies to assess tolerance limits and machine activation levels. Recent studies have been mainly focused on optimising this design to achieve both a smoother performance for nominal beam conditions and to gain operational flexibility for non-nominal scenarios. These include a review of the chopper beam dynamics design, a re-definition of the DTL and CCDTL inter-tank regions and a study of operational schemes for reduced beam currents (either permanent or in pulse-to-pulse mode). These studies have been carried out in parallel to first specifications for a beam commissioning strategy of the linac and its low-en...

  20. Evaluation of the energy required for constructing and operating a fusion power plant

    International Nuclear Information System (INIS)

    Buende, R.

    1982-09-01

    The energy required for constructing and operating a tokamak fusion power plant is appraised with respect to the energy output during the lifetime of the plant. A harvesting factor is deduced as a relevant figure of energetic merit and is used for a comparison between fusion, fission, and coal-fired power plants. Because fusion power plants involve considerable uncertainties the comparison is supplemented by a sensitivity analysis. In comparison with Light Water Reactor plants fusion power plants appear to be rather favourable in this respect. The energy required for providing the fuel is relatively low for fusion plants, thus overcompensating the considerable higher amount of energy necessary for constructing the fusion power plant. (orig.)