WorldWideScience

Sample records for construction commissioning operation

  1. Origins, and the construction, commissioning and operation of the SRS

    International Nuclear Information System (INIS)

    Thompson, D.J.

    1985-01-01

    The SRS was initiated in 1973 and approved in 1975. It came into use in 1981. The paper describes the organizational framework at the different stages, the pre-approval, construction, commissioning and operational phases of the storage ring, the build-up of experimental stations, and future plans. The emphasis is on lessons which can be learned by those about to embark on such a project, rather than on a detailed historical account, and on managerial rather than physics matters

  2. Construction, commissioning and initial operation of 2400W refrigerator and cold test stand for CDM testing

    International Nuclear Information System (INIS)

    Dubbs, J.D.; Kreinbrink, K.

    1994-01-01

    Air Products and CVI collaborated to design, construct and commission a refrigerator, test stands and integrated control system for the General Dynamics Collider Dipole Magnet Cold Test Facility (CTF) in Hammond, LA. The original project schedule required the cold test facility to be operational within 17 months of the notice to proceed. Midway through the project, changes in General Dynamics magnet testing requirements necessitated doubling the plant capacity, but the on stream date for the initial capacity increment could not be relaxed. The Air Products/CVI team had to adapt the project execution strategy to mitigate the schedule impact of the expansion in a cost effective manner without impacting system functionality, quality or safety. An equally challenging aspect of the job was that the (CTF) was being designed while several major systems that would interface with the CTF were being engineered. General Dynamics, Air Products and CVI had to work very closely to manage the interface issues. The teams efforts were very successful. The Hammond refrigerator/liquifier was started up on schedule. The first two test stands are currently being commissioned and will be on stream just six weeks later than the pre-expansion schedule target and all four test stands will be operational in time to support General Dynamics magnet testing requirements

  3. SSCL Commissioning and Operations

    International Nuclear Information System (INIS)

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  4. Construction, commissioning and operational experience of the Advanced Photon Source (APS) linear accelerator

    International Nuclear Information System (INIS)

    White, M.; Arnold, N.; Berg, W.

    1996-01-01

    The Advanced Photon Source linear accelerator system consists of a 200 MeV, 2856 MHz S-Band electron linac and a 2-radiation-thick tungsten target followed by a 450 MeV positron linac. The linac system has operated 24 hours per day for the past year to support accelerator commissioning and beam studies and to provide beam for the user experimental program. It achieves the design goal for positron current of 8 mA and produces electron energies up to 650 MeV without the target in place. The linac is described and its operation and performance are discussed

  5. Construction, commissioning and operational experience of the Advanced Photon Source (APS) linear accelerator

    International Nuclear Information System (INIS)

    White, M.; Arnold, N.; Berg, W.; Cours, A.; Fuja, R.; Grelick, A. E.; Sereno, N.; Wesolowski, W.; Ko, K.; Qian, Y.L.; Russell, T.

    1996-01-01

    The Advanced Photon Source linear accelerator system consists of a 200-MeV, 2856-MHz S-band electron linac and a 2-radiation-thick tungsten target followed by a 450-MeV positron linac. The linac system has operated 24 hours per day for the past year to support accelerator commissioning and beam studies and to provide beam for the user experimental program. It achieves the design goal for positron current of 8 mA and produces electron energies up to 650 MeV without the target in place. The linac is described and its operation and performance are discussed. (author)

  6. Technical report on the design, construction, commissioning and operation of the super-FRS of FAIR

    International Nuclear Information System (INIS)

    Geissel, H.; Winkler, M.; Weick, H.

    2005-04-01

    In this report the construction of the super-FRS is described. Especially described are the ion-optical lay-out, the production targets, the magnets, the beam dumps, the degrader systems and the ion catcher, detectors and data-acquisition systems, as well as the safety aspects. (HSI)

  7. The design, construction, commissioning and operation of a plant at Dounreay to dispose of sodium from KNKII

    International Nuclear Information System (INIS)

    Bowser, R.; Farquhar, J.; Currie, R.

    1997-01-01

    In a competitive bidding exercise, AEA Technology at Dounreay won a contract to dispose of 88 tonnes of fast reactor sodium from the KNKII reactor at KarIsruhe, Germany. This sodium comprises of 36 tonnes of 'primary' sodium containing traces of caesium-137 and sodium-22 and 52 tonnes of lightly tritiated 'secondary' sodium. The sodium has been transported solid to Dounreay in 200 litre drums. To fulfil this contract a sodium disposal plant has been designed, constructed, commissioned and put into operation. Following an option study, an aqueous reaction plant design was selected. In this process, sodium is reacted with aqueous caustic soda, producing hydrogen gas and more caustic soda. The hydrogen is diluted with air and vented to atmosphere, and the caustic is neutralised with hydrochloric acid before discharge to the site low-active drain. All effluents - gaseous or liquid - are filtered and treated to remove as much radioactivity as possible before discharge. The main reasons for choosing this design option were that the process was well proven, the reaction is easily controlled by controlling the supply of sodium into the reaction vessel, reaction temperatures are relatively low and the effluent can be easily prepared for discharge. It was also felt that an aqueous reaction plant could be designed to be operated remotely by one operator. The sodium in the drums is melted in a sodium melting station and then drained to a sodium buffer tank, prior to being injected into the reaction vessel. By collecting sodium in the buffer tank, sodium melting can proceed in parallel with sodium disposal allowing a high throughput to be achieved. This plant has been designed to dispose of 100 kg of sodium per hour, requiring a small operating team, suitably shielded from the radiological hazard. The design also ensures that the rate of reaction is controlled and that the effluent discharged to the low-active drain has been properly neutralised. The construction was performed

  8. Regulating Nuclear Reactor Construction and Commissioning, and Preparation for Operation – Challenges for a New Regulatory Body

    International Nuclear Information System (INIS)

    Viktorsson, C.

    2016-01-01

    Following an introduction with a description of the peaceful nuclear energy program in the United Arab Emirates (UAE) and an overview of the regulatory framework for safety, security and safeguards, this paper describes the regulatory approach for oversight of construction and the granting of an Operating Licence for the first nuclear power plant in the UAE. The paper describes the inspection programme set up by the Federal Authority for Nuclear Regulation (FANR) to verify construction and preoperational testing by the licensee. Moreover, it outlines the content of the operating licence application and focus areas for the regulatory review and assessment. Also, the paper describes the basic elements required by FANR for the decision-making regarding the issuance of the Operating Licence including integration of the results of review and assessment and the implementation of a systematic inspection programme to ensure operational readiness to operate and maintain the plant in accordance with FANR regulations. Finally, the paper addresses the preparation for regulatory oversight and the skill-set needed at FANR to ensure an effective and efficient oversight of safety, security of the nuclear energy power in the UAE. (author)

  9. LHC Commissioning and First Operation

    OpenAIRE

    Myers, S

    2010-01-01

    A description is given of the repair of the LHC after the accident of September 2008. The LHC hardware and beam commissioning and initial operation are reviewed both in terms of beam and hardware performance. The implemented machine protection measures and their impact on LHC operation are presented.

  10. LHC: Construction and Commissioning Status

    CERN Document Server

    Evans, Lyndon R

    2007-01-01

    The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with the exception of a few inner triplet quadrupoles. The first of the eight machine sectors is cold and power tests are proceeding. Two other sectors are ready for cool down and interconnect work is proceeding at a satisfactory pace in the other five sectors. In view of a number of accumulated delays, the original plan for partial commissioning of the machine and a low energy pilot run at the end of 2007 will now have to be abandoned. Instead, the full commissioning of the machine to top energy in a single step will start once the injector chain becomes available in spring 2008.

  11. Commissioning and Operational Experience in Power Reactor Fuel Reprocessing Plant

    Energy Technology Data Exchange (ETDEWEB)

    Pradhan, S., E-mail: spradhan@barctara.gov.in [Tarapur Based Reprocessing Plant, Bhabha Atomic Research Centre, Tarapur (India)

    2014-10-15

    After completing design, construction, commissioning, operation and maintenance experience of the reprocessing plants at Tarapur, Mumbai and Kalpakkam a new reprocessing plant is commissioned and put into operation at BARC, Tarapur since 2011. Subsequent to construction clearance, commissioning of the plant is taken in many steps with simultaneous review by design and safety committees. In spite of vast experience, all the staff was retrained in various aspects of process and utility operations and in operation of innovative changes incorporated in the design. Operating personnel are licensed through an elaborate procedure consisting of various check lists followed by personnel interview. Commissioning systems were divided in sub-systems. Sub-systems were commissioned independently and later integrated testing was carried out. For commissioning, extreme operating conditions were identified in consultation with designers and detailed commissioning procedures were made accordingly. Commissioning was done in different conditions to ensure safety, smooth operation and maintainability. Few modifications were carried out based on commissioning experience. Technical specifications for operation of the plant are made in consultation with designers and reviewed by safety committees. Operation of the plant was carried out after successful commissioning trials with Deep Depleted Uranium (DDU). Emergency operating procedures for each design basis accident were made. Performance of various systems, subsystems are quite satisfactory and the plant has given very good capacity factor. (author)

  12. Commissioning and operation of DRAGON

    International Nuclear Information System (INIS)

    Engel, Sabine

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the 21 Na(p,γ) 22 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of ±20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented

  13. Commissioning and operation of DRAGON

    CERN Document Server

    Engel, S

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the sup 2 sup 1 Na(p,gamma) sup 2 sup 2 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of +-20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented.

  14. Gentilly 2: design, construction and commissioning

    International Nuclear Information System (INIS)

    Amyot, Paul; Michel, Benoit.

    1982-06-01

    Construction of the Gentilly 2 power station is essentially complete, and commissioning is proceeding. The main activities during the 1981-82 period have been the completion of the construction and overall testing of the major systems. One cause of delay in the project in 1981 was the discovery of damage to the tubesheet of a steam generator. An internal manhole cover support in the steam generator head had become loose and had caused damage to the tube-to-tubesheet welds. Repairs to the welds were completed in Feb. 1982 after an extensive development program to qualify the welding procedure. Overall project life will be slightly more than 9 years

  15. A Public Commissioning Maturity Model for Construction Clients

    NARCIS (Netherlands)

    Hermans, M.H.; Volker, L.; Eisma, P.R.

    2014-01-01

    Being a public organization with construction needs, whether they are housing, building or infrastructure related, implies close co-operation and interaction with the supply chain. Substantial research exists that focuses on project related aspects of commissioning and on the role of the

  16. Large Hadron Collider commissioning and first operation.

    Science.gov (United States)

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  17. Licensing of the OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.

    2007-01-01

    This paper presents a description of the licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) OPAL reactor. It addresses the Construction Licence, the interface between ANSTO, INVAP (the contractor with responsibility for design and construction of the facility) and the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA, the Australian nuclear regulator) during the construction of OPAL, specific licensing issues that have arisen during the construction and commissioning process, and the Operating Licence Application. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators

  18. Licensing of ANSTO'S OPAL reactor during construction and commissioning

    International Nuclear Information System (INIS)

    Summerfield, M.W.; Ordonez, J.P.

    2006-01-01

    Full text: This paper presents a general description of the ongoing licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) Open Pool Australian Light-water (OPAL) Reactor at their Lucas Heights site. It addresses the following aspects: The Construction Licence - what it is and what impact it had on the construction of the OPAL Reactor, specifically the various Construction Licence Conditions; The interface between ANSTO, INVAP and ARPANSA during the construction of the OPAL Reactor, particularly in relation to ARPANS Regulation 54; Specific licensing issues that have arisen during the construction and commissioning process and how they have been resolved; The Operating Licence Application - what it is and how it interfaces with the construction and commissioning of the OPAL Reactor. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators. Note that this paper is an update of a presentation given at IGORR10 and follows on from a paper previously presented at PNBC12 in October 2002

  19. Operations management for construction

    CERN Document Server

    March, Chris

    2009-01-01

    Students studying construction management and related subjects need to have a broad understanding of the major aspects of controlling the building processes. Operations Management for Construction is one of three textbooks (Business Organisation, Operations Management and Finance Control) written to systematically cover the field. Focusing on construction sites and operations which are challenging to run, Chris March explores issues such as the setting up of the site, the deciding of the methodology of construction, and the sequence of work and resourcing. As changing and increasing regulations affect the way sites are managed, he also considers the issues and methods of successful administering, safety, quality and environment. Finally, the contractor's responsibility to the environment, including relationships with third parties, selection of materials, waste management and sustainability is discussed. Chris March has a wealth of practical experience in the construction industry, as well as considerable exp...

  20. Construction Minerals Operations

    Data.gov (United States)

    Department of Homeland Security — This map layer includes construction minerals operations in the United States. The data represent commodities covered by the Minerals Information Team (MIT) of the...

  1. The LHC from commissioning to operation

    CERN Document Server

    Lamont, M

    2011-01-01

    In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulating 1 fb-1 by the end of the year. The progress from commissioning to operation is described. Emphasis is put on the beam performance, but also on the performance of the different hardware systems. The role of collimation and machine protection is discussed, in view of the very high stored beam and magnet energy.

  2. Emergency operation procedure navigation to avoid commission errors

    International Nuclear Information System (INIS)

    Gofuku, Akio; Ito, Koji

    2004-01-01

    New types of operation control system equipped with a large screen and CRT-based operation panels have been installed in newly constructed nuclear power plants. The operators can share important information of plant conditions by the large screen. The operation control system can know the operations by operators through the computers connected to the operation panels. The software switches placed in the CRT-based operation panels have a problem such that operators may make an error to manipulate an irrelevant software switch with their current operation. This study develops an operation procedure navigation technique to avoid this kind of commission errors. The system lies between CRT-based operation panels and plant control systems and checks an operation by operators if it follows the operation procedure of operation manuals. When the operation is a right one, the operation is executed as if the operation command is directly transmitted to control systems. If the operation does not follow the operation procedure, the system warns the commission error to operators. This paper describes the operation navigation technique, format of base operation model, and a proto-type operation navigation system for a three loop pressurized water reactor plant. The validity of the proto-type system is demonstrated by the operation procedure navigation for a steam generator tube rupture accident. (author)

  3. SYSTEM OF STANDARTIZATION OF CONSTRUCTION OPERATIONS ARRANGEMENT

    Directory of Open Access Journals (Sweden)

    Oleynik Pavel Pavlovich

    2012-10-01

    Full Text Available In the proposed article, management of construction operations is represented as a multi-level system; it is considered with the framework of projects including new construction, restructuring and overhaul of buildings and structures. The system of management of construction operations is to be composed of the following three constituent parts. They include a construction and assembling entity, project and operations, and a procurement base. Such matters as the quality of construction products, purchase (lease of building machinery and vehicles are incorporated into the level of the construction and assembling entity. The project level comprises such components of construction operations management as pre-construction preparation of a project, methods and forms of construction management, preparatory works, management of construction activities, real-time operations control, construction quality control, etc. The level of operations and the procurement base covers the needs for materials and equipment, their purchase and procurement, as well as the warehouse management. The main elements of the standardization system are identified. Standards of construction operations management are explained, including 1. General Provisions; 2. Preparation and performance of construction and assembling works; 3. New construction. Building site organization; 4. Demolition (dismantling of buildings and structures; 5. Rules of preparation for acceptance and commissioning of completed residential buildings. The prospects for the further development of the system of standardization of construction operations management are outlined

  4. The Spallation Neutron Source Beam Commissioning and Initial Operations

    Energy Technology Data Exchange (ETDEWEB)

    Henderson, Stuart [Argonne National Lab. (ANL), Argonne, IL (United States); Aleksandrov, Alexander V. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Allen, Christopher K. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Assadi, Saeed [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Bartoski, Dirk [University of Texas, Houston, TX (United States). Anderson Cancer Center; Blokland, Willem [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Casagrande, F. [Michigan State Univ., East Lansing, MI (United States); Campisi, I. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Chu, C. [Michigan State Univ., East Lansing, MI (United States); Cousineau, Sarah M. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Crofford, Mark T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Danilov, Viatcheslav [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Deibele, Craig E. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Dodson, George W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Feshenko, A. [Inst. for Nuclear Research (INR), Moscow (Russian Federation); Galambos, John D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Han, Baoxi [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Hardek, T. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Holmes, Jeffrey A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Holtkamp, N. [SLAC National Accelerator Lab., Menlo Park, CA (United States); Howell, Matthew P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Jeon, D. [Inst. for Basic Science, Daejeon (Korea); Kang, Yoon W. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kasemir, Kay [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kim, Sang-Ho [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Kravchuk, L. [Institute for Nuclear Research (INR), Moscow (Russian Federation); Long, Cary D. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); McManamy, T. [McManamy Consulting, Inc., Middlesex, MA (United States); Pelaia, II, Tom [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Piller, Chip [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Plum, Michael A. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Pogge, James R. [Tennessee Technological Univ., Cookeville, TN (United States); Purcell, John David [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Shea, T. [European Spallation Source, Lund (Sweden); Shishlo, Andrei P [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Sibley, C. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stockli, Martin P. [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Stout, D. [Michigan State Univ., East Lansing, MI (United States); Tanke, E. [European Spallation Source, Lund (Sweden); Welton, Robert F [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States); Zhang, Y. [Michigan State Univ., East Lansing, MI (United States); Zhukov, Alexander P [Oak Ridge National Lab. (ORNL), Oak Ridge, TN (United States)

    2015-09-01

    The Spallation Neutron Source (SNS) accelerator delivers a one mega-Watt beam to a mercury target to produce neutrons used for neutron scattering materials research. It delivers ~ 1 GeV protons in short (< 1 us) pulses at 60 Hz. At an average power of ~ one mega-Watt, it is the highest-powered pulsed proton accelerator. The accelerator includes the first use of superconducting RF acceleration for a pulsed protons at this energy. The storage ring used to create the short time structure has record peak particle per pulse intensity. Beam commissioning took place in a staged manner during the construction phase of SNS. After the construction, neutron production operations began within a few months, and one mega-Watt operation was achieved within three years. The methods used to commission the beam and the experiences during initial operation are discussed.

  5. Establishment of Biosafety Level-3 (BSL-3 laboratory: Important criteria to consider while designing, constructing, commissioning & operating the facility in Indian setting

    Directory of Open Access Journals (Sweden)

    Devendra T Mourya

    2014-01-01

    This article describes the major steps involved in the process of construction of a BSL-3 laboratory in Indian settings, from freezing the concept of proposal to operationalization phase. The key to success of this kind of project is strong institutional commitment to biosafety norms, adequate fund availability, careful planning and designing, hiring good construction agency, monitoring by experienced consultancy agency and involvement of scientific and engineering personnel with biocontainment experience in the process.

  6. Assembly, commissioning and first operation of JET

    International Nuclear Information System (INIS)

    Huguet, M.

    1983-01-01

    A brief summary of the work carried out during the construction phase of JET is first given. This period was successfully concluded due to the well timed delivery by industry of all the major parts of the machine and power supplies. This could be achieved because of the excellent technical co-operation between the JET team and the firms involved in construction work. The assembly of the JET machine started on site in January 1982 immediately after civil engineering work was completed. Great attention was devoted to the preparation of the vacuum vessel octants. After delivery, they were carefully cleaned, baked and leak tested at 500 0 C, and then fitted with instrumentation, electrical heater cables and thermal insulation, in view of the bake-out of the complete vessel after final assembly

  7. Problems and experience of regulatory review associated with plant construction and commissioning

    International Nuclear Information System (INIS)

    Commander, W.

    1979-01-01

    The work of the Assessment Branch of NII covering the regulatory review during design safety assessment, construction, commissioning and operation is described commencing with the nuclear licensing procedure through licence variations and conditions attached to the licence, to the final stages of plant construction up to commercial operation and full power production. The importance of the application of safety assessment principles is outlined, the importance of the Safety Inspectorate Schedule described, and the need to retain organisational and regulatory flexibility emphasised. (author)

  8. Construction and Commissioning of PAL-XFEL Facility

    Directory of Open Access Journals (Sweden)

    In Soo Ko

    2017-05-01

    Full Text Available The construction of Pohang Accelerator Laboratory X-ray Free-Electron Laser (PAL-XFEL, a 0.1-nm hard X-ray free-electron laser (FEL facility based on a 10-GeV S-band linear accelerator (LINAC, is achieved in Pohang, Korea by the end of 2016. The construction of the 1.11 km-long building was completed by the end of 2014, and the installation of the 10-GeV LINAC and undulators started in January 2015. The installation of the 10-GeV LINAC, together with the undulators and beamlines, was completed by the end of 2015. The commissioning began in April 2016, and the first lasing of the hard X-ray FEL line was achieved on 14 June 2016. The progress of the PAL-XFEL construction and its commission are reported here.

  9. Safety of Nuclear Power Plants: Commissioning and Operation

    International Nuclear Information System (INIS)

    2011-01-01

    The safety of a nuclear power plant is ensured by means of proper site selection, design, construction and commissioning, and the evaluation of these, followed by proper management, operation and maintenance of the plant. In a later phase, a proper transition to decommissioning is required. The organization and management of plant operations ensures that a high level of safety is achieved through the effective management and control of operational activities. This publication is a revision of the Safety Requirements publication Safety of Nuclear Power Plants: Operation, which was issued in 2000 as IAEA Safety Standards Series No. NS-R-2. The purpose of this revision was to restructure Safety Standards Series No. NS-R-2 in the light of new operating experience and new trends in the nuclear industry; to introduce new requirements that were not included in Safety Standards Series No. NS-R-2 on the operation of nuclear power plants; and to reflect current practices, new concepts and technical developments. This update also reflects feedback on the use of the standards, both from Member States and from the IAEA's safety related activities. The publication is presented in the new format for Safety Requirements publications. The present publication reflects the safety principles of the Fundamental Safety Principles. It has been harmonized with IAEA Safety Standards Series No. GS-R-3 on The Management System for Facilities and Activities. Guidance on the fulfilment of the safety requirements is provided in supporting Safety Guides. The terminology used in this publication is defined and explained in the IAEA Safety Glossary. The objective of this publication is to establish the requirements which, in the light of experience and the present state of technology, must be satisfied to ensure the safe operation of nuclear power plants. These requirements are governed by the safety objective and safety principles that are established in the Fundamental Safety Principles. This

  10. NSLS-II commissioning and operation

    Energy Technology Data Exchange (ETDEWEB)

    Wang, G., E-mail: gwang@bnl.gov; Shaftan, T.; Bassi, G.; Bengtsson, J.; Blednykh, A.; Blum, E.; Cheng, W.; Choi, J.; Davidsaver, M.; Doom, L.; Fliller, R.; Ganetis, G.; Guo, W.; Hidaka, Y.; Kramer, S.; Li, Y.; Podobedov, B.; Qian, K.; Rose, J.; Seletskiy, S. [Brookhaven National Laboratory, Upton, NY 11973 (United States); and others

    2016-07-27

    The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

  11. Construction and commissioning experience of evolutionary water cooled nuclear power plants

    International Nuclear Information System (INIS)

    2004-04-01

    Electricity market liberalization is an established fact in several countries and there is a trend to adopt it in other countries. The essential aim of market liberalization is to improve the overall economic efficiency. In order that nuclear power remains a viable option for electricity generation, its costs should be competitive with alternative sources while, at the same time, it should have a safe and reliable operation record. The capital cost of nuclear power plants (NPPs) generally accounts for 43-70% of the total nuclear electricity generation costs, compared to 26-48% for coal plants and 13-32% for gas plants. Most of these expenditures are incurred during the construction phase of a NPP. The achievement of shorter construction periods using improved technology and construction methods has a significant benefit on the costs incurred prior to any production of electricity. This document is intended to make the recent worldwide experience on construction and commissioning of evolutionary water cooled NPPs available to Member States and especially to those with nuclear power plants under construction/planning, and to those seriously considering nuclear power projects in the future. The final aim is to assist utilities and other organizations in Member States to improve the construction of nuclear power plants and achieve shortened schedules and reduced costs without compromising quality and safety. This document aims to provide an overview of the most advanced technologies, methods and processes used in construction and commissioning of recent nuclear projects. To better achieve this objective the presentation is selectively focused more on the new developments rather than providing a full review of all issues related to construction and commissioning. The experience described in this TECDOC applies to managers, engineers, supervisors, technicians and workers in various organizations dealing with the site construction and commissioning of nuclear power plants

  12. Pickering dry storage - commissioning and initial operation

    International Nuclear Information System (INIS)

    Jonjev, S.

    1996-01-01

    Having commissioned all individual conventional and nuclear systems, the first Dry Storage Container (DSC) was loaded with four modules of 17 year cooled irradiated fuel (366 bundles) in the Auxiliary Irradiated Fuel Bay (AIFB) on November 29, 1995. After decontamination of the outer surface, and draining of water, the DSC was transported to the Used Fuel Dry Storage Facility (UFDSF) workshop, where it was vacuum dried, and then the lid was welded on. Following successful radiography test of the lid weld, the DSC was vacuum dried again and backfilled with Helium to a pressure of 930 mbar(a). The Helium leak test showed zero leakage (allowable leak rate is 1x10 -5 cc/sec). Finally, after loose contamination checks were performed and permanent safeguards seals were applied, the DSC was placed in the UFDSF storage area on January 23, 1996. Radiation fields at contact with the DSC surface were < 0.6 mrem/hr, and at the exterior surface of the storage building wall only 33 micro-rem/hr (far below the target of 250 micro-rem/hr). Therefore, the actual dose rates to general public (at the exclusion zone boundary) will be well below the design target of 1 % of the regulatory limit. (author). 3 refs., 2 tabs., 5 figs

  13. Pickering dry storage - commissioning and initial operation

    Energy Technology Data Exchange (ETDEWEB)

    Jonjev, S [Ontario Hydro, Pickering, ON (Canada). Pickering Generating Station

    1997-12-31

    Having commissioned all individual conventional and nuclear systems, the first Dry Storage Container (DSC) was loaded with four modules of 17 year cooled irradiated fuel (366 bundles) in the Auxiliary Irradiated Fuel Bay (AIFB) on November 29, 1995. After decontamination of the outer surface, and draining of water, the DSC was transported to the Used Fuel Dry Storage Facility (UFDSF) workshop, where it was vacuum dried, and then the lid was welded on. Following successful radiography test of the lid weld, the DSC was vacuum dried again and backfilled with Helium to a pressure of 930 mbar(a). The Helium leak test showed zero leakage (allowable leak rate is 1x10{sup -5} cc/sec). Finally, after loose contamination checks were performed and permanent safeguards seals were applied, the DSC was placed in the UFDSF storage area on January 23, 1996. Radiation fields at contact with the DSC surface were < 0.6 mrem/hr, and at the exterior surface of the storage building wall only 33 micro-rem/hr (far below the target of 250 micro-rem/hr). Therefore, the actual dose rates to general public (at the exclusion zone boundary) will be well below the design target of 1 % of the regulatory limit. (author). 3 refs., 2 tabs., 5 figs.

  14. Challenges encountered during an accelerated cogeneration plant construction and commissioning schedule

    International Nuclear Information System (INIS)

    Good, R.L.; Cox, T.P.; Vallejo, J.M.

    1988-01-01

    A decision was made in 1986 to proceed with a 110 magawatt grassroots cogeneration plant to supply the steam and electrical requirements of a large, integrated petrochemical manufacturing facility. Though some preliminary engineering had been done and long delivery equipment purchase orders had been let in the summer of 1986, detailed engineering did not commence until late October and construction until mid-December, 1986. Federal income tax consideration required that the project be in service prior to the end of 1987. This eleven month construction, commissioning, and start up schedule was achieved with 100 per cent operation occurring on December 22, 1987. Numerous challenges were met by the lean Project Team during this accelerated schedule. This paper discusses the development of: Project Team Staffing, Operator and Maintenance Staffing and Training, Commissioning Schedules and Staffing, solutions to Significant Technical Problems

  15. Experience with the use of building commissioning advisor - from design to operation

    DEFF Research Database (Denmark)

    Forman, Marianne

    2016-01-01

    The increased focus on building energy performance has intensified the need to ensure consistency between energy requirements, design, construction processes and operation in construction projects. With the introduction of the new Danish DS 3090 standard, "The commissioning process in buildings...... on ethnographic methods and theories, this paper will analyse and discuss what the use of a commissioning adviser in the design stage means for the interaction between design and operation. It may seem that "technical solutions" are made before “ongoing learning processes” in which new themes are articulated...

  16. The NEW detector: construction, commissioning and first results

    Science.gov (United States)

    Nebot-Guinot, M.; NEXT Collaboration

    2017-09-01

    NEXT (Neutrino Experiment with a Xenon TPC) is a neutrinoless double-beta (ββ0ν) decay experiment at the Canfranc Underground Laboratory (LSC). It seeks to detect the ββ0ν decay of Xe-136 using a high pressure xenon gas TPC with electroluminescent (EL) amplification. The NEXT-White (NEW) detector, with an active xenon mass of about 10 kg at 15 bar, is the first NEXT prototype installed at LSC. It implements the NEXT detector concept tested in smaller prototypes using the same radiopure sensors and materials that will be used in the future NEXT-100, serving as a benchmark for technical solutions as well as for the signal selection and background rejection algorithms. NEW is currently under commissioning at the LSC. In this poster proceedings we describe the technical solutions adopted for NEW construction, the lessons learned from the commissioning phase, and the first results on energy calibration and energy resolution obtained with low-energy radioactive source data.

  17. Construction and commissioning test report of the CEDM test facility

    Energy Technology Data Exchange (ETDEWEB)

    Chung, C. H.; Kim, J. T.; Park, W. M.; Youn, Y. J.; Jun, H. G.; Choi, N. H.; Park, J. K.; Song, C. H.; Lee, S. H.; Park, J. K

    2001-02-01

    The test facility for performance verification of the control element drive mechanism (CEDM) of next generation power plant was installed at the site of KAERI. The CEDM was featured a mechanism consisting of complicated mechanical parts and electromagnetic control system. Thus, a new CEDM design should go through performance verification tests prior to it's application in a reactor. The test facility can simulate the reactor operating conditions such as temperature, pressure and water quality and is equipped with a test chamber to accomodate a CEDM as installed in the power plant. This test facility can be used for the following tests; endurance test, coil cooling test, power measurement and reactivity rod drop test. The commissioning tests for the test facility were performed up to the CEDM test conditions of 320 C and 150 bar, and required water chemistry was obtained by operating the on-line water treatment system.

  18. Construction and commissioning test report of the CEDM test facility

    International Nuclear Information System (INIS)

    Chung, C. H.; Kim, J. T.; Park, W. M.; Youn, Y. J.; Jun, H. G.; Choi, N. H.; Park, J. K.; Song, C. H.; Lee, S. H.; Park, J. K.

    2001-02-01

    The test facility for performance verification of the control element drive mechanism (CEDM) of next generation power plant was installed at the site of KAERI. The CEDM was featured a mechanism consisting of complicated mechanical parts and electromagnetic control system. Thus, a new CEDM design should go through performance verification tests prior to it's application in a reactor. The test facility can simulate the reactor operating conditions such as temperature, pressure and water quality and is equipped with a test chamber to accomodate a CEDM as installed in the power plant. This test facility can be used for the following tests; endurance test, coil cooling test, power measurement and reactivity rod drop test. The commissioning tests for the test facility were performed up to the CEDM test conditions of 320 C and 150 bar, and required water chemistry was obtained by operating the on-line water treatment system

  19. Design, Construction and Commissioning of the Digital Hadron Calorimeter - DHCAL

    CERN Document Server

    Adams, C; Bilki, B.; Butler, J.; Corriveau, F.; Cundiff, T.; Drake, G.; Francis, K.; Furst, B.; Guarino, V.; Haberichter, B.; Hazen, E.; Hoff, J.; Holm, S.; Kreps, A.; DeLurgio, P.; Matijas, Z.; Monte, L.Dal; Mucia, N.; Norbeck, E.; Northacker, D.; Onel, Y.; Pollack, B.; Repond, J.; Schlereth, J.; Skrzecz, F.; Smith, J.R.; Trojand, D.; Underwood, D.; Velasco, M.; Walendziak, J.; Wood, K.; Wu, S.; Xia, L.; Zhang, Q.; Zhao, A.

    2016-01-01

    A novel hadron calorimeter is being developed for future lepton colliding beam detectors. The calorimeter is optimized for the application of Particle Flow Algorithms (PFAs) to the measurement of hadronic jets and features a very finely segmented readout with 1 x 1 cm2 cells. The active media of the calorimeter are Resistive Plate Chambers (RPCs) with a digital, i.e. one-bit, readout. To first order the energy of incident particles in this calorimeter is reconstructed as being proportional to the number of pads with a signal over a given threshold. A large-scale prototype calorimeter with approximately 500,000 readout channels has been built and underwent extensive testing in the Fermilab and CERN test beams. This paper reports on the design, construction, and commissioning of this prototype calorimeter.

  20. Construction and commissioning of the national synchrotron light source

    International Nuclear Information System (INIS)

    Galayda, J.N.; Blume, M.

    1985-01-01

    The road from conception to completion of a large facility like the National Synchrotron Light Source (NSLS) is a long and tortuous one. More than fifteen years have passed since the first discussions of a synchrotron radiation source at BNL, and there have been many twists and turns in the process. In putting together an accelerator project like this, there are many critical skills that must be assembled, and budgets, schedules and organizations must be properly examined. The lessons learned in design and commissioning of the NSLS rings may be summarized as follows: (1) the damped emittances expected of a Chasman-Green lattice are attainable at high current, if ion trapping problems can be circumvented; (2) there have been no unexpected effects from the rather strong sextupoles required to correct the chromaticities in this type of lattice; (3) the most important beam instabilities are coupled-bunch, and can be counteracted; and (4) commissioning the NSLS rings was mostly an effort to bring the hardware into conformation with the original ring design; achievement of the specified magnetic fields, injection timing, vacuum, RF voltages, etc. led to ring performance which was easily good enough to begin operation

  1. The ATLAS Liquid Argon Calorimeter: Construction, Integration, Commissioning

    International Nuclear Information System (INIS)

    Aleksa, Martin

    2006-01-01

    The ATLAS liquid argon (LAr) calorimeter system consists of an electromagnetic barrel calorimeter and two end caps with electromagnetic, hadronic and forward calorimeters. The liquid argon sampling technique, with an accordion geometry was chosen for the barrel electromagnetic calorimeter (EMB) and adapted to the end cap (EMEC). The hadronic end cap calorimeter (HEC) uses a copper-liquid argon sampling technique with flat plate geometry and is subdivided in depth in two wheels per end-cap. Finally, the forward calorimeter (FCAL) is composed of three modules employing cylindrical electrodes with thin liquid argon gaps.The construction of the full calorimeter system is complete since mid-2004. Production modules constructed in the home institutes were integrated into wheels at CERN in 2003-2004, and inserted into the three cryostats. They passed their first complete cold test before the lowering into the ATLAS cavern. Results of quality checks (e.g. electrical, mechanical, ...) performed on all the 190304 read-out channels after cool down will be reported. End 2004 the ATLAS barrel electromagnetic (EM) calorimeter was installed in the ATLAS cavern and since summer 2005 the front-end electronics are being connected and tested. Results of this first commissioning phase will be shown to demonstrate the high standards of quality control for our detectors

  2. NSLS-II injector commissioning and initial operation

    Energy Technology Data Exchange (ETDEWEB)

    Bacha, B.; Blum, E.; Bassi, B.; Bengtsson, J.; Blednykh, A.; Buda, S.; Cheng, W.; Choi, J.; Cuppolo, J.; D Alsace, R.; Davidsaver, M.; DeLong, J.; Doom, L.; Durfee, d.; fliller, R.; Fulkerson, M.; Ganetis, G.; Gao, F.; Gardner, C.; Guo, W.; Heese, R.; Hidaka, Y.; Hu, Y.; Johanson, M.; Kosciuk, B.; Kowalski, S.; Dramer, S.; Krinsky, S.; Li, Y.; Louie, W.; Maggipinto, M.; Marino, P.; Mead, J.; Oliva, G.; Padrazo, D.; Pedersen, K.; Podobedov, B.; Rainer, R.; Rose, J.; Santana, M.; Seletskiy, S.; Shaftan, T.; Singh, O.; Singh, P.; Smalyuk, V.; Smith, R.; Summers, T.; Tagger, J.; Tian, Y.; Wahl, W.; Wang, G.; Weiner, G.; Willeke, F.; Yang, L.; Yang, X.; Zeitler, E.; Zitvogel, E.; Zuhoski, P.

    2015-05-03

    The injector for the National Synchrotron Light Source II (NSLS-II) storage ring consists of a 3 GeV booster synchrotron and a 200 MeV S-band linac. The linac was designed to produce either a single bunch with a charge of 0.5 nC of electrons or a train of bunches up to 300 ns long containing a total charge of 15 nC. The booster was designed to accelerate up to 15 nC each cycle in a train of bunches up to 300 ns long. Linac commissioning was completed in April 2012. Booster commissioning was started in November 2013 and completed in March 2014. All of the significant design goals were satisfied including beam emittance, energy spread, and transport efficiency. While the maximum booster charge accelerated was only 10 nC, this has proven to be more than sufficient for storage ring commissioning and operation. The injector has operated reliably during storage ring operation since then. Results will be presented showing measurements of linac and booster operating parameters achieved during commissioning and initial operation. Operating experience and reliability during the first year of NSLS-II operation will be discussed.

  3. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    Science.gov (United States)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  4. Facility design, construction, and operation

    International Nuclear Information System (INIS)

    1995-04-01

    France has been disposing of low-level radioactive waste (LLW) at the Centre de Stockage de la Manche (CSM) since 1969 and now at the Centre de Stockage de l'Aube (CSA) since 1992. In France, several agencies and companies are involved in the development and implementation of LLW technology. The Commissariat a l'Energie Atomic (CEA), is responsible for research and development of new technologies. The Agence National pour la Gestion des Dechets Radioactifs is the agency responsible for the construction and operation of disposal facilities and for wastes acceptance for these facilities. Compagnie Generale des Matieres Nucleaires provides fuel services, including uranium enrichment, fuel fabrication, and fuel reprocessing, and is thus one generator of LLW. Societe pour les Techniques Nouvelles is an engineering company responsible for commercializing CEA waste management technology and for engineering and design support for the facilities. Numatec, Inc. is a US company representing these French companies and agencies in the US. In Task 1.1 of Numatec's contract with Martin Marietta Energy Systems, Numatec provides details on the design, construction and operation of the LLW disposal facilities at CSM and CSA. Lessons learned from operation of CSM and incorporated into the design, construction and operating procedures at CSA are identified and discussed. The process used by the French for identification, selection, and evaluation of disposal technologies is provided. Specifically, the decisionmaking process resulting in the change in disposal facility design for the CSA versus the CSM is discussed. This report provides' all of the basic information in these areas and reflects actual experience to date

  5. Construction and Commissioning of the CALICE Analog Hadron Calorimeter Prototype

    CERN Document Server

    Adloff, C.; Repond, J.; Brandt, A.; Brown, H.; De, K.; Medina, C.; Smith, J.; Li, J.; Sosebee, M.; White, A.; Yu, J.; Buanes, T.; Eigen, G.; Mikami, Y.; Miller, O.; Watson, N.K.; Wilson, J.A.; Goto, T.; Mavromanolakis, G.; Thomson, M.A.; Ward, D.R.; Yan, W.; Benchekroun, D.; Hoummada, A.; Khoulaki, Y.; Oreglia, M.; Benyamna, M.; Carloganu, C.; Gay, P.; Ha, J.; Blazey, G.C.; Chakraborty, D.; Dyshkant, A.; Francis, K.; Hedin, D.; Lima, G.; Zutshi, V.; Babkin, V.A.; Bazylev, S.N.; Fedotov, Yu I.; Slepnev, V.M.; Tiapkin, I.A.; Volgin, S.V.; Hostachy, J.Y.; Morin, L.; D'Ascenzo, N.; Cornett, U.; David, D.; Fabbri, R.; Falley, G.; Feege, N.; Gadow, K.; Garutti, E.; Gottlicher, P.; Jung, T.; Karstensen, S.; Korbel, V.; Lucaci-Timoce, A.I.; Lutz, B.; Meyer, N.; Morgunov, V.; Reinecke, M.; Schatzel, S.; Schmidt, S.; Sefkow, F.; Smirnov, P.; Vargas-Trevino, A.; Wattimena, N.; Wendt, O.; Groll, M.; Heuer, R.D.; Richter, S.; Samson, J.; Kaplan, A.; Schultz-Coulon, H.Ch; Shen, W.; Tadday, A.; Bilki, B.; Norbeck, E.; Onel, Y.; Kim, E.J.; Kim, G.; Kim, D.W.; Lee, K.; Lee, S.C.; Kawagoe, K.; Tamura, Y.; Ballin, J.A.; Dauncey, P.D.; Magnan, A.M.; Yilmaz, H.; Zorba, O.; Bartsch, V.; Postranecky, M.; Warren, M.; Wing, M.; Faucci Giannelli, M.; Green, M.G.; Salvatore, F.; Kieffer, R.; Laktineh, I.; Fouz, M.C.; Bailey, D.S.; Barlow, R.J.; Thompson, R.J.; Batouritski, M.; Dvornikov, O.; Shulhevich, Yu; Shumeiko, N.; Solin, A.; Starovoitov, P.; Tchekhovski, V.; Terletski, A.; Bobchenko, B.; Chadeeva, M.; Danilov, M.; Markin, O.; Mizuk, R.; Morgunov, V.; Novikov, E.; Rusinov, V.; Tarkovsky, E.; Andreev, V.; Kirikova, N.; Komar, A.; Kozlov, V.; Smirnov, P.; Soloviev, Y.; Terkulov, A.; Buzhan, P.; Dolgoshein, B.; Ilyin, A.; Kantserov, V.; Kaplin, V.; Karakash, A.; Popova, E.; Smirnov, S.; Baranova, N.; Boos, E.; Gladilin, L.; Karmanov, D.; Korolev, M.; Merkin, M.; Savin, A.; Voronin, A.; Topkar, A.; Frey, A.; Kiesling, C.; Lu, S.; Prothmann, K.; Seidel, K.; Simon, F.; Soldner, C.; Weuste, L.; Bouquet, B.; Callier, S.; Cornebise, P.; Dulucq, F.; Fleury, J.; Li, H.; Martin-Chassard, G.; Richard, F.; de la Taille, Ch.; Poeschl, R.; Raux, L.; Ruan, M.; Seguin-Moreau, N.; Wicek, F.; Anduze, M.; Boudry, V.; Brient, J.C.; Gaycken, G.; Cornat, R.; Jeans, D.; Mora de Freitas, P.; Musat, G.; Reinhard, M.; Rouge, A.; Vanel, J.Ch; Videau, H.; Park, K.H.; Zacek, J.; Cvach, J.; Gallus, P.; Havranek, M.; Janata, M.; Kvasnicka, J.; Marcisovsky, M.; Polak, I.; Popule, J.; Tomasek, L.; Tomasek, M.; Ruzicka, P.; Sicho, P.; Smolik, J.; Vrba, V.; Zalesak, J.; Arestov, Yu; Ammosov, V.; Chuiko, B.; Gapienko, V.; Gilitski, Y.; Koreshev, V.; Semak, A.; Sviridov, Yu; Zaets, V.; Belhorma, B.; Belmir, M.; Baird, A.; Halsall, R.N.; Nam, S.W.; Park, I.H.; Yang, J.; Chai, J.S.; Kim, J.T.; Kim, G.B.; Kim, Y.; Kang, J.; Kwon, Y.J.; Kim, I.; Lee, T.; Park, J.; Sung, J.; Itoh, S.; Kotera, K.; Nishiyama, M.; Takeshita, T.; Weber, S.; Zeitnitz, C.

    2010-01-01

    An analog hadron calorimeter (AHCAL) prototype of 5.3 nuclear interaction lengths thickness has been constructed by members of the CALICE Collaboration. The AHCAL prototype consists of a 38-layer sandwich structure of steel plates and highly-segmented scintillator tiles that are read out by wavelength-shifting fibers coupled to SiPMs. The signal is amplified and shaped with a custom-designed ASIC. A calibration/monitoring system based on LED light was developed to monitor the SiPM gain and to measure the full SiPM response curve in order to correct for non-linearity. Ultimately, the physics goals are the study of hadron shower shapes and testing the concept of particle flow. The technical goal consists of measuring the performance and reliability of 7608 SiPMs. The AHCAL was commissioned in test beams at DESY and CERN. The entire prototype was completed in 2007 and recorded hadron showers, electron showers and muons at different energies and incident angles in test beams at CERN and Fermilab.

  6. Construction and commissioning of the CALICE analog hadron calorimeter prototype

    International Nuclear Information System (INIS)

    Adloff, C.; Karyotakis, Y.

    2010-03-01

    An analog hadron calorimeter (AHCAL) prototype of 5.3 nuclear interaction lengths thickness has been constructed by members of the CALICE Collaboration. The AHCAL prototype consists of a 38-layer sandwich structure of steel plates and highlysegmented scintillator tiles that are read out by wavelength-shifting fibers coupled to SiPMs. The signal is amplified and shaped with a custom-designed ASIC. A calibration/ monitoring system based on LED light was developed to monitor the SiPM gain and to measure the full SiPM response curve in order to correct for non-linearity. Ultimately, the physics goals are the study of hadron shower shapes and testing the concept of particle flow. The technical goal consists of measuring the performance and reliability of 7608 SiPMs. The AHCAL was commissioned in test beams at DESY and CERN. The entire prototype was completed in 2007 and recorded hadron showers, electron showers and muons at different energies and incident angles in test beams at CERN and Fermilab. (orig.)

  7. Construction and commissioning of the CALICA analog hadron calorimeter prototype

    Energy Technology Data Exchange (ETDEWEB)

    Adloff, C.; Karyotakis, Y. [Universite de Savoie, Annecy-le-Vieux (France). Laboratoire d' Annecy-le-Vieux de Physique des Particules, CNRS/IN2P3; Repond, J. [Argonne National Laboratory, Argonne, IL (US)] (and others)

    2010-03-15

    An analog hadron calorimeter (AHCAL) prototype of 5.3 nuclear interaction lengths thickness has been constructed by members of the CALICE Collaboration. The AHCAL prototype consists of a 38-layer sandwich structure of steel plates and highlysegmented scintillator tiles that are read out by wavelength-shifting fibers coupled to SiPMs. The signal is amplified and shaped with a custom-designed ASIC. A calibration/ monitoring system based on LED light was developed to monitor the SiPM gain and to measure the full SiPM response curve in order to correct for non-linearity. Ultimately, the physics goals are the study of hadron shower shapes and testing the concept of particle flow. The technical goal consists of measuring the performance and reliability of 7608 SiPMs. The AHCAL was commissioned in test beams at DESY and CERN. The entire prototype was completed in 2007 and recorded hadron showers, electron showers and muons at different energies and incident angles in test beams at CERN and Fermilab. (orig.)

  8. Computational tools for cyclotron design, commissioning, and operation

    International Nuclear Information System (INIS)

    Kost, C.J.

    1989-05-01

    Many support systems are required in the design, commissioning, and normal operation of a modern cyclotron. Presented is an overview of the computing environment developed during these various stages at TRIUMF. The current computing environment is also discussed, with emphasis on how one can provide an integrated system which is user-friendly

  9. Jules Horowitz Reactor: Organisation for the Preparation of the Commissioning Phase and Normal Operation

    Energy Technology Data Exchange (ETDEWEB)

    Estrade, J.; Fabre, J. L.; Marcille, O. [French Alternative Energies end Atomic Energy Commission, Provence (France)

    2013-07-01

    The Jules Horowitz Reactor (JHR) is a new modern Material Testing Reactor (MTR) currently under construction at CEA Cadarache research centre in the south of France. It will be a major research facility in support to the development and the qualification of materials and fuels under irradiation with sizes and environment conditions relevant for nuclear power plants in order to optimise and demonstrate safe operations of existing power reactors as well as to support future reactors design. It will represent also an important research infrastructure for scientific studies dealing with material and fuel behaviour under irradiation. The JHR will contribute also to secure the production of radioisotope for medical application. This is a key public health stake. The construction of JHR which started in 2007 is going-on with target of commissioning by the end of 2017. The design of the reactor provides modern experimental capacity in support to R and D programs for the nuclear energy for the next 60 years. In parallel to the facility construction, the preparation of the future staff and of the organisation to operate the reactor safely, reliably and efficiently is an important issue. In this framework, many actions are in progress to elaborate: Ο the staffing and the organisational structure for the commissioning test phases and also for normal operation, Ο the documentation in support to the reactor operation (safety analysis report, general operating rules, procedures, instructions, ···), Ο the maintenance, in service and periodic test programs, Ο staff training programs by using dedicated facilities (simulator, ···) Ο commissioning test programs for ensuring that the layout of systems and subcomponents is completed in accordance with the design requirements, the specification performances and the safety criteria. These commissioning tests will also be helpful for transferring the knowledge on the installed systems to the operating group. This paper gives the

  10. Behind the Scenes of Public Construction Clients – Collecting Data on Commissioning Activities and Organisational Approach

    NARCIS (Netherlands)

    Hermans, M.H.; Eisma, P.R.

    2015-01-01

    The understanding of public commissioning activity is fairly limited, with national and European research primarily focusing on large scale projects, European procurement procedures and new construction. However, most construction activities involve small scale projects and assignments performed by

  11. Experience in commissioning and scientific support of nuclear power plant operation in the German Democratic Republic

    International Nuclear Information System (INIS)

    Ackermann, G.; Endler, A.; Loth, K.H.

    1983-01-01

    In the German Democratic Republic two nuclear power plants equipped with four pressurized-water WWER-440-type reactors were commissioned in the years 1973-1979 and have since been in routine operation. The nuclear power plants (NPPs) in the GDR were constructed on the basis of projects developed and tested in the Soviet Union. Their main equipment was also supplied by the USSR. Under the technical supervision of USSR scientific institutions and design organizations, the construction, commissioning and operation of NPPs had to be prepared and organized by the design organizations, scientific institutions and the prospective user in the German Democratic Republic. To this effect, and to ensure nuclear safety, availability and maximum exploitation of nuclear fuel, it was necessary to develop national scientific capacities. The organizations of the USSR supply basic and supplementary documents prescribing the required extent of investigations to prove that the equipment and systems will meet the projected and operational conditions from loading to commercial operation. Concrete test programmes for commissioning and operational instructions are elaborated by national organizations. Pre-operational and initial startup tests are performed by the personnel of the plant, of enterprises and scientific institutions under the technical supervision of the design organizations of the USSR and the German Democratic Republic. Proceeding from experience gained for more than 15 years in the scientific support of commissioning and operation, the required training and disciplines of personnel are reported. The tasks to be met by the various disciplines are described. Furthermore, information is given on the main stages of commissioning and on a number of results. Finally, selected results of work in connection with operational assistance are reported

  12. Safety of Nuclear Power Plants: Commissioning and Operation

    International Nuclear Information System (INIS)

    2011-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  13. Safety of Nuclear Power Plants: Commissioning and Operation (French Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  14. Safety of Nuclear Power Plants: Commissioning and Operation. Arabic Edition

    International Nuclear Information System (INIS)

    2011-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  15. Safety of Nuclear Power Plants: Commissioning and Operation (Spanish Edition)

    International Nuclear Information System (INIS)

    2012-01-01

    This publication is a revision of Safety Requirements No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe operation of nuclear power plants. Over recent years there have been developments in areas such as long term operation, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. It became necessary to revise the IAEA's safety requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the Fundamental Safety Principles. Contents: 1. Introduction; 2. Safety objectives and principles; 3. The management and organizational structure of the operating organization; 4. Management of operational safety; 5. Operational safety programmes; 6. Plant commissioning; 7. Plant operations; 8. Maintenance, testing, surveillance and inspection; 9. Preparation for decommissioning.

  16. Construction and commissioning of the Hinkley Point 'B' and Hunterston 'B' boilers

    International Nuclear Information System (INIS)

    White, D.C.; Holmes, R.L.

    1977-01-01

    Prior to construction and erection of the reactor boiler units, within the concrete pressure vessel, the units were received from the manufacturing works, and stored in clean and humidity controlled conditions. Because of the loading facilities into the reactor pressure vessel, a very precise erection procedure had to be adhered to. The activities associated with construction of feedwater inlet, superheater steam, and reheated steam inlet and outlet penetrations had to be programmed accordingly. By the very nature of the work load, the time scale involved, and the prime need to maintain the boiler unit materials free of deterioration from atmospheric corrosion after erection, early commissioning of storage systems were implemented; providing wet or dry storage conditions as dictated by the two Generating Boards. Pre-operational commissioning also covered the work of setting up all the steam and water controls, isolating valve systems and the automatic and sequence equipment associated with the feed water controls which are a major design feature of the once through boiler operation. (author)

  17. Commissioning and operation of the horizontal test apparatus at SNS

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Sang-Ho [ORNL; Neustadt, Thomas S. [ORNL; Howell, Matthew P. [ORNL; Hannah, Brian S. [ORNL; Doleans, Marc [ORNL; Saunders, Jeffrey W. [ORNL

    2015-07-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Lab (ORNL) has built, commissioned and operated a Horizontal Test Apparatus (HTA) vessel in the Radiofrequency Test Facility (RFTF) test cave. It can be operated at 4.5 K using the independent Cryogenic Test Facility (CTF). The HTA is designed to be a single cavity version of an SNS cryomodule with the ability to demount and replace the cavity. It provides the functionality for testing a single dressed SNS medium or high beta Superconducting Radiofrequency (SRF) cavity. The HTA is currently being used in support of R&D for in-situ plasma processing of the cavity's inner niobium surface. The design and commissioning of the HTA at 4.5 K will be presented as well as results from operating the HTA including cool-down, warm-up and steady state operations. Results from plasma processing a warm SCRF cavity in-between cold HTA tests will also be reported.

  18. Construction and early commissioning results of the AGS Booster

    International Nuclear Information System (INIS)

    Weng, W.T.; Ahrens, L.; Damm, R.; McNerney, A.J.

    1991-01-01

    The AGS Booster synchrotron has been designed to accelerate protons from 200 MeV to 1.5 GeV and heavy ions from several MeV per nucleon to several hundred MeV per nucleon for all the nuclei up to gold. The design requirements and measurements results of major accelerator components and systems are presented. The early commissioning results of the injection is also presented. 12 refs., 9 figs., 2 tabs

  19. The construction and commissioning of MINT's latex irradiator

    International Nuclear Information System (INIS)

    Razali Hamzah; Muhd Khairi Muhd Said; Muhd Ariff Hamzah; Wan Manshol Wan Zin; Taiman Kadni

    1996-01-01

    The construction and installation of MINT's automatic continuous latex irradiator is described. MINT cooperated with NUKEM to design the plant. Construction was done by local building consultants and local contractor. The installation of the plant includes local fabrication components and imported components. The plant is automatically controlled by a computer system. Features of plant is described

  20. Construction and commissioning of a hydrogen cryogenic distillation system for tritium recovery at ICIT Rm. Valcea

    Energy Technology Data Exchange (ETDEWEB)

    Ana, George, E-mail: george.ana@icsi.ro [Institute for Cryogenic and Isotopic Technologies, Rm. Valcea (Romania); Cristescu, Ion [Karlsruhe Istitute for Technologies, Tritium Laboratory, Eggenstein-Leopoldshaffen (Germany); Draghia, Mirela [ISTECH, Timisoara (Romania); Bucur, Ciprian; Balteanu, Ovidiu; Vijulie, Mihai; Popescu, Gheorghe; Costeanu, Claudiu; Sofilca, Nicolae; Stefan, Iulia; Daramus, Robert; Niculescu, Alina; Oubraham, Anisoara; Spiridon, Ionut; Vasut, Felicia; Moraru, Carmen; Brad, Sebastian [Institute for Cryogenic and Isotopic Technologies, Rm. Valcea (Romania); Pasca, Gheorghe [ISTECH, Timisoara (Romania)

    2016-05-15

    Highlights: • Cryogenic distillation (CD) process is being employed for tritium separation from tritiated hydrogen mixtures. • Process control and safety phylosophy with the detritiation plant from Rm. Vâlcea. • Tests undertaken prior to commissioning of the CD system from Rm. Vâlcea. • Preliminary experiments with the CD system (non-radiological). - Abstract: Cryogenic distillation (CD) of hydrogen in combination with Liquid Phase Catalytic Exchange (LPCE) or Combined Electrolytic Catalytic Exchange (CECE) process is used for tritium removal/recovery from tritiated water. Tritiated water is being obtained after long time operation of CANDU reactors, or in case of ITER mainly by the Detritiation System (DS). The cryogenic distillation system (CDS) used to remove/recover tritium from a hydrogen stream consists of a cascade of cryogenic distillation columns and a refrigeration unit which provides the cooling capacity for the condensers of CD columns. The columns, together with the condensers and the process heat-exchangers are accommodated in a vacuumed cold box. In the particularly case of the ICIT Plant, the cryogenic distillation cascade consists of four columns with diameters between 100–7 mm and it has been designed to process up to 10 mc/h of tritiated deuterium. This paper will present the steps undertaken for construction and commissioning of a pilot plant for tritium removal/recovery by cryogenic distillation of hydrogen. The paper will show besides preliminary data obtained during commissioning, also general characteristics of the plant and its equipments.

  1. Summarisation of construction and commissioning experience for nuclear power integrated test facility

    International Nuclear Information System (INIS)

    Xiao Zejun; Jia Dounan; Jiang Xulun; Chen Bingde

    2003-01-01

    Since the foundation of Nuclear Power Institute of China, it has successively designed various engineering experimental facilities, and constructed nuclear power experimental research base, and accumulated rich construction experiences of nuclear power integrated test facility. The author presents experience on design, construction and commissioning of nuclear power integrated test facility

  2. Design, commissioning and operation of the Swiss Light Source SLS

    International Nuclear Information System (INIS)

    Streun, Andreas

    2003-01-01

    The Swiss Light Source (SLS) at the Paul Scherrer Institute (PSI) is the most recent 3rd generation light source coming to operation. It consists of a 12- TBA storage ring of 288 m circumference providing 5 nm rad emittance at 2.4 GeV, a novel type of full energy booster synchrotron and a 100 MeV linac. The initial four beamlines cover protein X-ray crystallography (PX), materials science (MS), surface and interface spectroscopy (SIS) and microscopy (SIM). We will review the project history, describe the design concepts of the accelerators and the technical subsystems, and report on the commissioning process and the status of operation by end of 2002. (author)

  3. Construal operations of the English progressive construction

    DEFF Research Database (Denmark)

    Jensen, Kim Ebensgaard

    2011-01-01

    present paper provides an overview of construal operations that are likely to be at play in the construction of the aspectual and actional meaning components of the progressive construction. The discussion also involves instances of the progressive construction, which display low semantic compatibility...

  4. Construction and operation costs of constructed wetlands treating wastewater.

    Science.gov (United States)

    Gkika, Dimitra; Gikas, Georgios D; Tsihrintzis, Vassilios A

    2014-01-01

    Design data from nine constructed wetlands (CW) facilities of various capacities (population equivalent (PE)) are used to estimate construction and operation costs, and then to derive empirical equations relating the required facility land area and the construction cost to PE. In addition, comparisons between the costs of CW facilities based on various alternative construction materials, i.e., reinforced concrete and earth structures (covered with either high density polyethylene or clay), are presented in relation to the required area. The results show that earth structures are economically advantageous. The derived equations can be used for providing a preliminary cost estimate of CW facilities for domestic wastewater treatment.

  5. The KLOE-2 Inner Tracker: Detector commissioning and operation

    Energy Technology Data Exchange (ETDEWEB)

    Balla, A.; Bencivenni, G. [Laboratori Nazionali di Frascati dell' INFN, Frascati (Italy); Branchini, P. [INFN Sezione di Roma Tre, Roma (Italy); Ciambrone, P. [Laboratori Nazionali di Frascati dell' INFN, Frascati (Italy); Czerwinski, E. [Jagiellonian University, Institute of Physics, Cracow (Poland); De Lucia, E. [Laboratori Nazionali di Frascati dell' INFN, Frascati (Italy); Cicco, A. [Dipartimento di Matematica e Fisica dell' Università di “Roma Tre”, Roma (Italy); Di Domenici, D.; Felici, G.; Morello, G. [Laboratori Nazionali di Frascati dell' INFN, Frascati (Italy)

    2017-02-11

    The KLOE-2 experiment started its data taking campaign in November 2014 with an upgraded tracking system including an Inner Tracker built with the cylindrical GEM technology, to operate together with the Drift Chamber improving the apparatus tracking performance. The Inner Tracker is composed of four cylindrical triple-GEM, each provided with an X–V strips-pads stereo readout and equipped with the GASTONE ASIC developed inside the KLOE-2 collaboration. Although GEM detectors are already used in high energy physics experiment, this device is considered a frontier detector due to its cylindrical geometry: KLOE-2 is the first experiment to use this novel solution. The results of the detector commissioning, detection efficiency evaluation, calibration studies and alignment, both with dedicated cosmic-ray muon and Bhabha scattering events, will be reported.

  6. Commissioning and operation of the CEBAF end station refrigeration system

    International Nuclear Information System (INIS)

    Arenius, D.; Bevins, B.; Chronis, W.C.; Ganni, V.

    1996-01-01

    The CEBAF End Station Helium Refrigerator (ESR) System provides refrigeration at 80 K, 20 K and 4.5 K to three End Station experimental halls. The facility consists of a two stage helium screw compressor system, 4.5 K refrigerator, cryogen distribution valve box, and transfer lines to the individual experimental halls. The 4.5 K cold box and compressors were originally part of the ESCAR 1500 W, 4 K refrigeration system at Lawrence Berkeley Laboratory which was first commissioned in 1977. The compressors, 4.5 K cold box, and control system design were modified to adapt the plant for the requirements of the CEBAF experimental halls. Additional subsystems of cryogen distribution, transfer lines, warm gas management, and computer control interface were added. This paper describes the major plant subsystems, modifications, operational experiences and performance

  7. Control system user interface for accelerator commissioning and operation

    International Nuclear Information System (INIS)

    Dobrott, D.; Keeley, D.; Kolte, G.; Mikic, Z.; Lee, M.; Corbett, J.; Howry, S.; King, A.

    1991-01-01

    An Interactive Accelerator Interface Module (AIM) has been developed in a workstation environment for the purposes of assisting in the commissioning and operation of any storage ring/collider system. The function of AIM is to integrate modeling and simulation codes into accelerator and beamline control systems for the purpose of rapid on-line data analysis and error-correction, resulting in significant time-saving. A system dependent module provides for the translation of specific control system data files to appropriate input format for application programs within AIM. Interactive screen graphics, including system function diagrams, menus, beamline element status and update information are standard in AIM. AIM is currently connected to the Stanford Linear Collider (SLC) control system, but is easily transportable to other facilities. This paper describes the development of AIM and its applications on SLC

  8. Experience from construction and operation of Karachi nuclear power plant

    International Nuclear Information System (INIS)

    Zaidi, S.M.N.

    1977-01-01

    Pakistan's first nuclear power plant (KANUPP) is owned and operated by the Pakistan Atomic Energy Commission (PAEC). It uses a heavy water moderated and cooled natural uranium fuelled reactor. Total installed capacity is 137 MW(e). It was designed, constructed and commissioned by Canadian General Electric Co. Ltd. (CGE) as Prime Contractor. Construction started in mid-1966 and was completed in mid 1970; commissioning started in early 1970 and was completed at the end of 1972. Intensive on-the-job training for 20 engineers and 15 operators was provided by CGE in Canada. Ten engineers also worked in CGE's design offices. With this key group of engineers and technicians PAEC had no difficulty in taking over the plant from CGE after completion. The construction of the plant in a developing country presented special problems to CGE. The relatively small local construction firms had limited experience and equipment. Construction plant, equipment and tools were scarce. Fabrication and workshop facilities of limited scope were available but their quotations were relatively high. A scarcity of engineering, technical and skilled manpower for the construction of the project left as the only alternative on-site training for carefully recruited technicians. The results were most gratifying and compared favourably with CGE's Canadian experience. Welding, pipe fitting, tubing work and electrical connections were excellent. The local staff's productivity and dedication were very good. In the commissioning period, PAEC and CGE engineers and technicians worked as one team, testing and debugging the equipment and systems and demonstrating the contractual performance warranties. This period extended to approximately three years due to many technical problems resulting from equipment failures, environmental problems, system problems, plant loading limitations in view of the relatively small size of the grid system and special requirement of fuel conditioning to avoid premature fuel

  9. Commissioning and operation of the nuclear physics injector at SLAC

    International Nuclear Information System (INIS)

    Koontz, R.F.; Miller, R.H.; Leger, G.K.; Iverson, R.

    1985-01-01

    The new Nuclear Physics Injector (NPI) approved for construction in October of 1983 was completed by September of 1984, and delivered short pulse beams for SPEAR ring checkout in mid-October. Long pulse beams of up to 1.6 microsecond length were also demonstrated. The paper describes the start-up operation, reviews the performance characteristics, and discusses the beam transport optics used to deliver 1 to 4 GeV beams to nuclear physics experiments in End Station A. The SLAC Nuclear Physics Injector is in full operation!

  10. Construction of Nijenhuis operators and dendriform trialgebras

    Directory of Open Access Journals (Sweden)

    Philippe Leroux

    2004-01-01

    Full Text Available We construct Nijenhuis operators from particular bialgebras called dendriform-Nijenhuis bialgebras. It turns out that such Nijenhuis operators commute with TD-operators, a kind of Baxter-Rota operators, and are therefore closely related to dendriform trialgebras. This allows the construction of associative algebras, called dendriform-Nijenhuis algebras, made out of nine operations and presenting an exotic combinatorial property. We also show that the augmented free dendriform-Nijenhuis algebra and its commutative version have a structure of connected Hopf algebras. Examples are given.

  11. Safety in nuclear power plant operation, including commissioning and decommissioning. A code of practice

    International Nuclear Information System (INIS)

    1978-01-01

    Safe operation of a nuclear power plant postulates satisfactory siting, design, construction and commissioning, together with proper management and operation of the plant. This Code of Practice deals with the safety aspects of management, commissioning, operation and decommissioning of the plant. It forms part of the Agency's programme, referred to as the NUSS programme, for establishing Codes of Practice and Safety Guides relating to land-based stationary thermal neutron power plants. It has been prepared for the use of those responsible for the operation of stationary nuclear power plants, the main function of which is the generation of electrical and/or thermal power, and for the use of those responsible for regulating the operation of such plants. It is not intended for application to reactors used solely for experimental or research purposes. The provisions in the Code are designed to provide assurance that operational activities are carried out without undue radiological hazard to the general public and to persons on the site. It should be understood that the provisions in the Code set forth minimum requirements which shall be met in order to achieve safe operation of a nuclear power plant

  12. Experiences in commissioning and in the first operating cycle of GKN-II

    International Nuclear Information System (INIS)

    Grauf, E.; Zaiss, W.; Tschannerl, J.

    1990-01-01

    In 1989, after only four and a half years of construction, the second unit of the Neckar Joint Nuclear Power Station (GKN-II) was commissioned as the third convoy type nuclear power plant. Its gross power of 1314 MWe makes the pressurized water reactor of GKN-II a unit in the highest power category so far of Siemens/KWU. Delivery to the operators ahead of schedule and observance of the budget are conclusive proof of the advantages of the convoy principle. In addition, GKN-II was able to benefit from the experience accumulated in the construction and commissioning of the two earlier convoy plants. This was reflected in the speedy completion, without major disturbances, of the warranty tests and the trial period of operation. It also has an impact on power operation, the first cycle of which showed the plant to have an availability of 100% throughout and is considered to be a full success by the operators. A special feature of GKN-II is the hybrid cooling tower ensuring that no heated cooling water is returned from the plant into the Neckar river. (orig.) [de

  13. Enterprise risk management in international construction operations

    CERN Document Server

    Zhao, Xianbo; Low, Sui Pheng

    2015-01-01

    This book provides readers an understanding of the implementation of Enterprise Risk Management (ERM) for international construction operations. In an extended case study, it primarily focuses on Chinese construction firms (CCFs) based in Singapore. In this regard, the book explains the differences and similarities between Risk Management (RM), Project Risk Management (PRM) and ERM in the construction industry, and examines their linkages for international construction operations in a broader context. The explanation elaborates on how companies may adopt and implement RM, PRM and ERM as appropriate in their various operations, both in their home market as well as in overseas host markets. The book also reviews the whole spectrum of work relating to organizational behavior (OB) as one of the key underpinnings for companies to evaluate and implement ERM. It will benefit practitioners from the industry as well as academics interested in the implementation of ERM practices in international construction operat...

  14. Laparotomy operative note template constructed through a modified Delphi method.

    Science.gov (United States)

    Moore, Lolonya; Churley-Strom, Ruth; Singal, Bonita; O'Leary, Sharon

    2009-05-01

    An operative note is indispensable to physician documentation and decision-making; however, there are no accepted standards for operative note content. Our aim was to use a modified Delphi consensus-building method to construct a uniform operative note template for laparotomy. Using Joint Commission on Accreditation of Healthcare Organizations requirements, literature review, and feedback from 15 medical malpractice defense attorneys, we compiled a draft operative note template of 31 elements. We surveyed 37 Association of Professor of Gynecology and Obstetrics/Solvay scholars asking for their input on inclusion of each item as essential content of the operative note. Two iterations of the survey were required to reach a predetermined 75% level of consensus. Nine elements were eliminated from the template: 6 original and 3 expert-suggested elements. We provide an operative note template that was compiled through a Delphi process.

  15. Behind the Scenes of Public Construction Clients – Collecting Data on Commissioning Activities and Organisational Approach

    OpenAIRE

    Hermans, Marleen; Eisma, Pieter

    2015-01-01

    The understanding of public commissioning activity is fairly limited, with national and European research primarily focusing on large scale projects, European procurement procedures and new construction. However, most construction activities involve small scale projects and assignments performed by smaller scale semi-public organisations such as hospitals, schools or housing associations. Similarities and differences between new construction and asset management have not received ample attent...

  16. Construction of vertex operators using operator formalism techniques

    International Nuclear Information System (INIS)

    Gato, B.; Massachusetts Inst. of Tech., Cambridge

    1989-01-01

    We derive vertex operators in oscillator form as an application of the conserved charges method developed by Vafa for the operator formalism in higher genus Riemann surfaces. This construction proves to be clear, direct and valid for the bosonic and fermionic strings as wells as for twisted strings on orbifolds. We discuss the method and construct vertex operators for the bosonic string moving on Z N orbifolds and for the fermionic string in the NSR formulation. (orig.)

  17. Operations Management on The Construction Site

    DEFF Research Database (Denmark)

    Koch, Christian

    2004-01-01

    this as a refreshing renewal and improvement of practical operations management at the site. However this paper will present a first step of development of a new approach to operations management at the building site, which at the same time builds on, and criticize lean construction for missing the point...... of the knowledge economy. This endeavour is carried out in two ways. First by a reading of the operations management literature. Juxtaposing this with lean construction extentions and the critique developed by other scholars. And also drawing on human resource management approaches. Second through a series......” scheme. In both directions it is revealed that the human resource and knowledge element of building processes is largely left untouched by lean construction methods. It is suggested to introduce at least two more dimensions of operations management at the site than the ones offered in lean construction...

  18. Integrated safety analysis to operate while constructing Urenco USA

    International Nuclear Information System (INIS)

    Kohrt, Rick; Su, Shiaw-Der; Lehman, Richard

    2013-01-01

    The URENCO USA (UUSA) site in Lea County, New Mexico, USA is authorized by the U.S. Nuclear Regulatory Commission (NRC) for construction and operation of a uranium enrichment facility under 10 CFR 70 (Ref 1). The facility employs the gas centrifuge process to separate natural uranium hexafluoride (UF 6 ) feed material into a product stream enriched up to 5% U-235 and a depleted UF 6 stream containing approximately 0.2 to 0.34% U-235. Initial plant operations, with a limited number of cascades on line, commenced in the second half of 2010. Construction activities continue as each subsequent cascade is commissioned and placed into service. UUSA performed an Integrated Safety Analysis (ISA) to allow the facility to operate while constructing the remainder of the facility. The ISA Team selected the What-If/Checklist method based on guidance in NUREG-1513 (Ref 2) and AIChE Guidelines (Ref 3). Of the three methods recommended for high risk events HAZOP, What-If/Checklist, or Failure Modes and Effects Analysis (FMEA), the What-If/Checklist lends itself best to construction activities. It combines the structure of a checklist with an unstructured 'brainstorming' approach to create a list of specific accident events that could produce an undesirable consequence. The What-If/Checklist for Operate While Constructing divides the UUSA site into seven areas and creates what-if questions for sixteen different construction activities, such as site preparation, external construction cranes, and internal construction lifts. The result is a total of 112 nodes, for which the Operate While Constructing ISA Team created hundreds of what-if questions. For each what-if question the team determined the likelihood, consequences, safeguards, and acceptability of risk. What-if questions with unacceptable risk are the accident sequences and their selected safeguards are the Items Relied on For Safety (IROFS). The final ISA identified four (4) new accident sequences that, unless

  19. Commissioning and operation of the nuclear physics injector at SLAC

    International Nuclear Information System (INIS)

    Koontz, R.F.; Iverson, R.; Leyer, G.K.; Miller, R.H.

    1985-01-01

    The new Nuclear Physics Injector (NPI) approved for construction in October of 1983 was completed by September of 1984, and delivered short pulse beams for SPEAR ring checkout in mid-October. Long pulse beams of up to 1.6 microsecond length were also demonstrated. The paper describes the startup operation, reviews the performance characteristics, and discusses the beam transport optics used to deliver 1 to 4 GeV beams to nuclear physics experiments in End Station A. The SLAC Nuclear Physics Injector is in full operationexclamation

  20. Commissioning and operation of distillation column at Madras Atomic Power Station (Paper No. 1.10)

    International Nuclear Information System (INIS)

    Neelakrishnan, G.; Subramanian, N.

    1992-01-01

    In Madras Atomic Power Station (MAPS), an upgrading plant based on vacuum distillation was constructed to upgrade the downgraded heavy water collected in vapor recovery dryers. There are two distillation columns and each having a capacity of 77.5 tonne per annum of reactor grade heavy water with average feed concentration of 30% IP. The performance of the distillation columns has been very good. The column I and column II have achieved an operating factor of 92% and 90% respectively. The commissioning activities, and subsequent improvements carried out in the distillation columns are described. (author)

  1. Methods for reduction of the period for construction and commissioning of NPP

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2004-01-01

    The process of construction of NPP unit is associated with significant amount of engineering, civil construction works, equipment installation and testing works. In order to achieve better economical results from the point of view of the investor, it will be a benefit if the time period for construction and commissioning of the unit is reduced. In order to realize such reduction of the needed time it is possible to utilize some new approaches for installation of heavy equipment, utilization of prefabricated in advance composite modules of equipment and application of new types of construction equipment and techniques. In such way the commissioning period can be reduced, and high quality of the installation works can be achieved. (author)

  2. How to Commission, Operate and Maintain a Large Future Accelerator Complex From Far Remote Sites

    International Nuclear Information System (INIS)

    Phinney, Nan

    2001-01-01

    A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commissioning, machine development, maintenance, trouble shooting and repair. Experience from existing accelerators confirms that most of these activities are already performed remotely. The large high-energy physics experiments and astronomy projects, already involve international collaborations of distant institutions. Based on this experience, the prospects for a machine operated remotely from far sites are encouraging. Experts from each laboratory would remain at their home institution but continue to participate in the operation of the machine after construction. Experts are required to be on site only during initial commissioning and for particularly difficult problems. Repairs require an on-site non-expert maintenance crew. Most of the interventions can be made without an expert and many of the rest resolved with remote assistance. There appears to be no technical obstacle to controlling an accelerator from a distance. The major challenge is to solve the complex management and communication problems

  3. How to Commission, Operate and Maintain a Large Future Accelerator Complex From Far Remote Sites

    Energy Technology Data Exchange (ETDEWEB)

    Phinney, Nan

    2001-12-07

    A study on future large accelerators [1] has considered a facility, which is designed, built and operated by a worldwide collaboration of equal partner institutions, and which is remote from most of these institutions. The full range of operation was considered including commissioning, machine development, maintenance, troubleshooting and repair. Experience from existing accelerators confirms that most of these activities are already performed 'remotely'. The large high-energy physics experiments and astronomy projects, already involve international collaborations of distant institutions. Based on this experience, the prospects for a machine operated remotely from far sites are encouraging. Experts from each laboratory would remain at their home institution but continue to participate in the operation of the machine after construction. Experts are required to be on site only during initial commissioning and for particularly difficult problems. Repairs require an on-site non-expert maintenance crew. Most of the interventions can be made without an expert and many of the rest resolved with remote assistance. There appears to be no technical obstacle to controlling an accelerator from a distance. The major challenge is to solve the complex management and communication problems.

  4. The ATLAS Insertable B-Layer: from construction to operation

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00218666; The ATLAS collaboration

    2016-01-01

    The ATLAS Insertable B-Layer (IBL) is the innermost layer of pixel detectors, and was installed in May 2014 at a radius of 3.3 cm from the beam axis, between the existing Pixel detector and a new smaller radius beam-pipe. The new detector, built to cope with high radiation and occupancy, is the first large scale application of 3D sensors and CMOS 130 nm technology. The IBL detector construction was completed within about two years (2012-2014), and the key features and challenges met during the IBL project are presented, as well as its commissioning and operational experience at the LHC

  5. Extensive Analysis of Worldwide Events Related to The Construction and Commissioning of Nuclear Power Plants: Lessons Learned and Recommendations

    International Nuclear Information System (INIS)

    Noel, M.; Zerger, B.; Vuorio, U.; )

    2011-01-01

    Lessons learnt from past experience are extensively used to improve the safety of nuclear power plants (NPPs) worldwide. Although the process of analyzing operational experience is now widespread and well developed, the need for establishment of a similar process for construction experience was highlighted by several countries embarking on construction of new NPPs and in some international forums including the Working Group on the Regulation of New Reactors (WGRNR) of the OECD-NEA. In 2008, EU Member State Safety Authorities participating to the EU Clearinghouse on Operational Experience Feedback decided to launch a topical study on events related to pre-operational stages of NPPs. The aim of this topical study is to reduce the recurrence of events related to the construction, the initial component manufacturing and the commissioning of NPPs, by identifying the main recurring and safety significant issues. For this study, 1090 IRS event reports, 857 US Licensee Event Reports (LERs) and approximately 100 WGRNR reports have been preselected based on key word searches and screened. The screening period starts from the beginning of the databases operation (in the 1980's as far as IRS and LER database are concerned) and ends in November 2009. After this initial screening, a total of 582 reports have been found applicable (247 IRS reports, 309 LERs and 26 WGRNR reports). Events considered for this study were those which have been initiated before the start of commercial operation, and detected before or even long after commercial operation. The events have been classified into 3 main categories (construction, manufacturing and commissioning), and into further sub-categories (building structures, metallic liners, electrical components, anchors, I and C, penetrations and building seals, emergency diesel generators, pipes, valves, welds, pumps, etc.) in order to facilitate the detailed analysis with the final objective to formulate both equipment specific

  6. Experience relevant to safety obtained from reactor decommissioning operations in the French Atomic Energy Commission

    International Nuclear Information System (INIS)

    Giraudel, B.; Langlois, G.

    1979-01-01

    From among the nuclear facilities constructed in France the authors cite eight large reactors, ranging from critical assemblies to power reactors, that have been finally shut-down since 1965. A brief account is given of the way in which the various operations were carried out after the final control rod drop, a distinction being drawn between the shut-down proper and the containment and dismantling work. A description is also given, from the technical and regulatory standpoint, of the final stage attained, and mention is made of French safety arrangements and of the part played by the safety services during decommissioning operations. Among the lessons derived from French experience, the authors mention the completion of operations without any serious safety problems, and with guarantees for the protection of personnel and the population as a whole, by conventional techniques; the advantage of planning decommissioning operations from the very beginning of construction of the facilities; and the importance of filing descriptive documents. In view of the experience gained, the French Atomic Energy Commission has devised internal procedures for facilitating the application of regulations governing the shut-down and decommissioning phases, which are aimed at preserving surveillance procedures similar to those in force during normal operation. (author)

  7. Experience of analysis of the operational occurrences in Angra-1 during the commissioning phase

    International Nuclear Information System (INIS)

    Praes, J.G.L.; Borba, P.R.; Collussi, I.

    1984-01-01

    It is presented a methodology and analysis to determine the importance level of the operational occurences. It is included a description and evaluation of a operational occurence in Angra-1 during the commissioning. (M.C.K.) [pt

  8. Basic national requirements for safe design, construction and operation

    International Nuclear Information System (INIS)

    Franzen, L.F.

    1980-01-01

    Nuclear power plants have to be save. Vendors and utilities operating such plants, are convinced that their plants meet this requirement. Who, however, is establishing the safety requirements to be met by those manufacturing and operating nuclear power plants. What are the mechanisms to control whether the features provided assure the required safety level. Who controls whether the required and planned safety features are really provided. Who is eventually responsible for assuring safety after commissioning of a nuclear power plant. These fundamental questions being raised in many discussions on safety and environmental protection are dealt with in the following sections: (1) Fundamental safety requirements on nuclear power plants, in which such items as risk, legal bases and licensing procedure are discussed, (2) Surveillance during construction, in which safety analysis report, siting, safety evaluation, document examination, quality assurance, and commissioning testing are dealt with, (3) Operating tests and conditions in which recurrent inspections, environmental protection during operation, investigation of abnormal occurences and backfitting requirements as reviewed, and (4) Safety philosophy and safety policy to conclude this presentation. The German approach to nuclear safety serves as an example for an effective way of assuring safe nuclear power. (orig.)

  9. Commissioning and operating experience with the LISA superconducting accelerator

    International Nuclear Information System (INIS)

    Castellano, M.; Ferrario, M.; Minestrini, M.; Patteri, P.; Tazzioli, F.; Kulinski, S.

    1996-06-01

    The commissioning of the LISA superconducting (SC) RF electron linac at INFN Frascati Laboratories has been concluded although, due to a change in program priorities, the full possibilities of the machine have not been exploited. In this report the authors illustrate the results achieved so far and the difficulties encountered in commissioning, with the hope that this material might be some of help to those who intend to start the enterprise of building a SC linac in a non specialized environment. The part concerning the SC system is particularly stressed, but a relevant attention is also devoted to the traditional room temperature injector, the proper setting of which is fundamental to achieving the high beam quality that such a machine allows

  10. Co-operation Agreement relating to LHC Commissioning

    CERN Multimedia

    2005-01-01

    CERN Director-General Robert Aymar and Ryszard Tadeusiewicz, the Rector of the AGH University of Science and Technology in Cracow, after signing the agreement. On 29 July, the Rector of the AGH University of Science and Technology in Cracow, Ryszard Tadeusiewicz, and CERN Director-General Robert Aymar signed a collaboration agreement relating to the commissioning of the instrumentation and monitoring equipment for the LHC cryogenic system. Under the agreement, a team consisting of a dozen physicists, engineers and technicians from the AGH University in Cracow will lend a helping hand to the teams at CERN for the commissioning of the cryogenic system in the tunnel. This is the first in what will be a series of agreements relating to the commissioning of the LHC's various systems. From the end of this year until the summer of 2007, CERN will require reinforcements of physicists, engineers and technicians in order to complete the many tasks associated with the start-up of the accelerator. CERN is therefore pre...

  11. The ATLAS Liquid Argon Electromagnetic Calorimeter Construction, commissioning and elected test beam results

    CERN Document Server

    Hervás, L

    2004-01-01

    The construction of the ATLAS Liquid Argon Electromagnetic Calorimeter has been completed and commissioning is in progress to prepare the cryostats for lowering into the ATLAS pit. After a brief description of the detector, its construction and readout electronics, this paper summarizes results of quality checks (electrical, connectivity) carried out during the integration of the calorimeter wheels into the cryostats. We present also selected results of its performance, such as linearity, energy resolution, timing resolution, uniformity of the energy response, obtained in beam tests with several series modules. 16 Refs.

  12. Commissioning of the ATLAS Insertable B-Layer and first operation experience

    CERN Document Server

    AUTHOR|(INSPIRE)INSPIRE-00439451; Dobos, Daniel; Rembser, Christoph

    Todays research in particle physics offers a wide field of opportunities for scientists from a variety of different subjects. Discoveries can only be made, with hundreds up to thousands of people working together in collaborations. Designing high precision detectors that can be up to several stories tall, followed by production, construction, commissioning and successful operation is only achievable with the combined effort of skilled and experienced detector physicists and engineers, while the vast amount of data recorded with those detectors calls for specialists in data analysis which are able to find the needle in a haystack or in other words the higgs in a sea of underground events. One of the biggest science collaborations worldwide is the ATLAS collaboration with more than 5000 members from around 180 institutes. ATLAS is one of four big particle physics experiments at the LHC. Its tracking system has been upgraded with a new innermost layer, referred to as Insertable B-Layer (IBL), in 2014. This thesi...

  13. AP1000 construction and operating costs

    Energy Technology Data Exchange (ETDEWEB)

    Winters, J.W.; Corletti, M.M. [Westinghouse Electric Corp., Pittsburgh, PA (United States); Thompson, M

    2001-07-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  14. AP1000 construction and operating costs

    International Nuclear Information System (INIS)

    Winters, J.W.; Corletti, M.M.; Thompson, M.

    2001-01-01

    Market analysis of the U.S. electricity generating market indicates that the generating cost of competitive new generating capacity must be less than $0.03/kw-hr. When such factors as an attractive return on investment and payback period are considered for a new nuclear electric generating facility, this results in the requirement to have an overnight capital cost of approximately $1000/kw. Industry executives indicate that any new nuclear plant must be able to compete in the de-regulated generation wholesale marketplace and provide a return to the shareholders. Against this standard, the costs of advanced nuclear power plants currently available are still too high. In the United States, the Utility Requirements Document for advanced light water reactor plants included a cost goal that was based on the cost of coal generated electricity at the time the document was written. Since that time, the cost of new generating capacity and the overall operating cost of generating electricity has gone down. This is a result of low natural gas prices, more efficient plants in general and the current record breaking reductions in outage times and operating costs for nuclear plants. The plant designs resulting from the United States advanced light water reactor plant programs received Design Certification from the United States Nuclear Regulatory Commission. Some are being deployed, with variations, in countries other than the United States. But they can not compete today with other sources of central station generation in the United States. (author)

  15. Dimensioning, construction and commissioning of a coffee beans drying system with use of solar collectors

    International Nuclear Information System (INIS)

    Mora Vindas, Allan Gerardo

    2014-01-01

    A system of low-cost solar drying of coffee beans is dimensioned, built and commissioned by using solar collectors based on recycled aluminum cans. The information is collected from literature about the drying of coffee, types of drying and the various types of solar dryers.The coffee beans drying system is conceptualized and sized based on a solar collector constructed of aluminum cans as solar radiation absorbing material. The grain drying system is then built in coffee benefit CoopeTarrazu to all provided by the company and help materials and labor facilities. A guide to implementation of solar drying technology with general information is tailored to implement, select, build and maintain a solar grain dryer in Central America. The launch of the drying system was made by checking the proper functioning of the system and measurement instruments variables selected to calculate the efficiency of the system. The drying system is tested with a load of 45 kg of coffee bean, using a flow of air through natural convection to operate the system with the exclusive use of renewable energy. The grain is drying from a humidity of 50% (b.n), up to a humidity between 11% and 13% (b.n), which is the range generally used for the safe storage of grain. Facts of solar radiation, temperature, air velocity, relative humidity and grain humidity were taken to determine the behavior of the sized system. The maximum thermal efficiency achieved by the solar collector is determined constructed of 18%, with an air flow of 0.013 kg/s and a solar radiation 1138 W/m 2 . The average drying efficiency during experimentation was 17.8%, which is among the range of efficiencies for the type of drying equipment. Best thermal efficiencies were obtained from the solar collector built that the commercial solar collector compared. Controlling the flow of air into the equipment is recommended in order to improve the thermal efficiency and drying equipment, using blowers, fans or induced draft chimney

  16. Biogas plants: Design, construction and operation

    International Nuclear Information System (INIS)

    2001-01-01

    At the big readiness of waste coming from the agricultural activities are looked for the production of Energy and Payments, the biogas like product of the organic decomposition under anaerobic conditions, their composition and characteristic. The elements that conform the design as the digester, the storage, the load tanks and it discharges and the conduction is described and analyzed. They are given a series of elements to obtain the characteristics of the system possible to place as: planning, calculations, evaluation, execution and operation. Lastly the steps are indicated that should be continued in the construction of the plant including planning for the work

  17. The ATLAS Insertable B-Layer: from construction to operation

    CERN Document Server

    La Rosa, Alessandro; The ATLAS collaboration

    2016-01-01

    The ATLAS Insertable B-Layer (IBL) is a fourth layer of pixel detectors, and has been installed in May 2014 at a radius of 3.3 cm between the existing Pixel Detector and a new smaller radius beam-pipe. The new detector, built to cope with high radiation and occupancy, is the first large scale application of 3D detectors and CMOS 130nm technology. The IBL detector construction was achieved within about two years starting from mid-2012 to the May 2014 installation in ATLAS, a very tight schedule to meet the ATLAS installation and detector closure before starting the Run2 in Spring 2015. The key features and challenges met during the IBL project will be presented, as well as its commissioning and operational experience in LHC.

  18. Constructed wetlands for pollution control: processes, performance, design and operation

    National Research Council Canada - National Science Library

    2000-01-01

    .... Types of constructed wetland, major design parameters, role of vegetation, hydraulic patterns, loadings, treatment efficiency, construction, operation and maintenance costs are discussed in depth...

  19. Chemistry control at Bruce NGS 'B' from constructed to commercial operation

    International Nuclear Information System (INIS)

    Roberts, J.G.

    1987-01-01

    Pre-operational storage chemistry and flushing of the secondary side is described. The approach devised for Bruce NGS 'B' Unit 6 was unique for an Ontario Hydro Nuclear Unit. The significance of the improved Construction installation and Quality Assurance procedures, combined with those of Operations is identified. Secondary side chemistry during both commissioning and later operation is reported. It will be shown that the application of ALARA (As Low As is Reasonably Achievable) concept has resulted in tighter chemical specifications being met

  20. Commissioning and preliminary operation of HL-2A tokamak

    International Nuclear Information System (INIS)

    Liu Dequan; Liu Yong; Yan Jianchen; Cao Zeng; Yang Qingwei; Zhou Caipin; Li Xiaodong

    2005-01-01

    HL-2A is a divertor tokamak located at new site of Southwestern Institute of Physics (SWIP), Chengdu, China. It can be operated in double-null and single-null divertor with closed configurations. The effects of the divertor on impurity behaviors, MHD instabilities, transport, wall conditioning and divertor physics are key issues to be studied during the first step operation on HL-2A. Preliminary experiments with limiter and single null divertor configurations were carried out in 2003. Main parameters achieved are the plasma current 168 KA, duration time of 920 ms and plasma linear-averaged density of 1.7 x 10 19 m -3 . The impurities, especially of low Z, are clearly decreased during the divertor experiments

  1. A Study on the Efficient Operating Management of Atomic Energy Commission

    International Nuclear Information System (INIS)

    Yun, Sungwon; Chung, W. S.; Lee, D. S.; Park, S. J.

    2013-04-01

    This study aimed to provide professionals in humanities and social sciences, not only nuclear, with a place for communication by establishing a website of Atomic Energy Commission and people with a place for participation which help the nuclear policy reflect public opinions. By establishing the website of Atomic Energy Commission, experts (including those in humanities and social sciences) can suggest policy agenda and public opinions can be suggested through the place for public participation. Also the website should restrict on indiscreet search by separating sections only for experts and provide experts with a section for active and creative debate on nuclear policy. All the accessible meeting agenda and minutes have been chronologically organized and the findings of the committee have been announced to share with people concerning nuclear policy. In terms of the effective operation of Atomic Energy Commission, research has been conducted for standing committee, regular meeting, activating the commission through system change and expert committee in addition to support for the 2nd meeting of Atomic Energy Committee and the 31st Nuclear Expert Committee. Activation measures to improve the operating system of the commission is proposed as following; changing of the commission's chairman operating system, standing commission regular meeting, activation of subcommittee and expanding and diversifying of agenda

  2. 47 CFR 25.133 - Period of construction; certification of commencement of operation.

    Science.gov (United States)

    2010-10-01

    ... 47 Telecommunication 2 2010-10-01 2010-10-01 false Period of construction; certification of commencement of operation. 25.133 Section 25.133 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES SATELLITE COMMUNICATIONS Applications and Licenses Earth Stations § 25.133 Period...

  3. Commissioning of the SPARC Movable Emittance Meter and Its First Operation at PITZ

    CERN Document Server

    Catani, L; Cianchi, A

    2005-01-01

    For the SPARC Project a novel diagnostic device, called "Emittance-meter", has been conceived and constructed to perform a detailed study of the emittance compensation process in the SPARC photo-injector and to optimize the RF-gun and the accelerator working point. It consists of a movable emittance measurement system, based on the 1D pepper-pot method, installed between two long bellows with the possibility to scan a region 1.5 m long downstream the RF-gun. The construction of the device was completed in the first part of this year and a series of laboratory tests, to evaluate its performances, were carried out in Spring 2005. At the beginning of the summer the complete system was moved to DESY at Zeuthen to be installed on the Photo Injector Test Facility PITZ. After the commissioning it will used for measurements of the PITZ electron beam in the framework of a collaboration between the SPARC and PITZ Projects aiming on studies and operations with photo injectors.

  4. Progress toward commissioning and plasma operation in NSTX-U

    Science.gov (United States)

    Ono, M.; Chrzanowski, J.; Dudek, L.; Gerhardt, S.; Heitzenroeder, P.; Kaita, R.; Menard, J. E.; Perry, E.; Stevenson, T.; Strykowsky, R.; Titus, P.; von Halle, A.; Williams, M.; Atnafu, N. D.; Blanchard, W.; Cropper, M.; Diallo, A.; Gates, D. A.; Ellis, R.; Erickson, K.; Hosea, J.; Hatcher, R.; Jurczynski, S. Z.; Kaye, S.; Labik, G.; Lawson, J.; LeBlanc, B.; Maingi, R.; Neumeyer, C.; Raman, R.; Raftopoulos, S.; Ramakrishnan, R.; Roquemore, A. L.; Sabbagh, S. A.; Sichta, P.; Schneider, H.; Smith, M.; Stratton, B.; Soukhanovskii, V.; Taylor, G.; Tresemer, K.; Zolfaghari, A.; The NSTX-U Team

    2015-07-01

    The National Spherical Torus Experiment-Upgrade (NSTX-U) is the most powerful spherical torus facility at PPPL, Princeton USA. The major mission of NSTX-U is to develop the physics basis for an ST-based Fusion Nuclear Science Facility (FNSF). The ST-based FNSF has the promise of achieving the high neutron fluence needed for reactor component testing with relatively modest tritium consumption. At the same time, the unique operating regimes of NSTX-U can contribute to several important issues in the physics of burning plasmas to optimize the performance of ITER. NSTX-U further aims to determine the attractiveness of the compact ST for addressing key research needs on the path toward a fusion demonstration power plant (DEMO). The upgrade will nearly double the toroidal magnetic field BT to 1 T at a major radius of R0 = 0.93 m, plasma current Ip to 2 MA and neutral beam injection (NBI) heating power to 14 MW. The anticipated plasma performance enhancement is a quadrupling of the plasma stored energy and near doubling of the plasma confinement time, which would result in a 5-10 fold increase in the fusion performance parameter nτ T. A much more tangential 2nd NBI system, with 2-3 times higher current drive efficiency compared to the 1st NBI system, is installed to attain the 100% non-inductive operation needed for a compact FNSF design. With higher fields and heating powers, the NSTX-U plasma collisionality will be reduced by a factor of 3-6 to help explore the favourable trend in transport towards the low collisionality FNSF regime. The NSTX-U first plasma is planned for the Summer of 2015, at which time the transition to plasma operations will occur.

  5. The design, construction, and commissioning of a multi-use cyclotron facility

    International Nuclear Information System (INIS)

    Ho, S.; Hutcheson, M.; Schick-Martin, D.; Dalzell, M.; Alexander, N.

    2015-01-01

    The Sylvia Fedoruk Canadian Centre for Nuclear Innovation in Saskatchewan is in the process of commissioning the Saskatchewan Centre for Cyclotron Sciences that is to be used for both academic research and commercial radiopharmaceutical production. The hybrid nature of this facility comes with unique challenges in satisfying both the rigid demands of pharmaceutical production while providing the necessary flexibility for academic research. In order to meet these competing demands, the Fedoruk Centre has assembled a distinct combination of skill sets and areas of expertise to operate a facility with an interdisciplinary focus. (author)

  6. Design, construction and operation of Ontario Hydro's CANDU plants

    International Nuclear Information System (INIS)

    Campbell, P.G.

    1981-06-01

    Ontario Hydro has been producing electricity commercially from nuclear power since 1968, using CANDU reactors which have proved enormously successful. The 206-MW Douglas Point station, nearly 10 times larger than the first Canadian power reactor, NPD-2, resulted from a cooperative effort between Atomic Energy of Canada Ltd., the provincial government of Ontario, and Ontario Hydro. This approach led to a basic working relationship between the parties, with Ontario Hydro acting as project manager and builder, and AECL acting as consultant with respect to the nuclear components. Before Douglas Point was fully commissioned Ontario Hydro was ready to commit itself to more nuclear stations, and work was started on the four-unit Pickering nuclear generating station. Multi-unit stations were adopted to achieve economies of scale, and the concept has been retained for all subsequent nuclear power plants constructed in the province. The organization of Ontario Hydro's project management, construction, and operation of nuclear generating stations is described. Performance of the existing stations and cost of the power they produce have been entirely acceptable

  7. Design, Construction, Installation and First Commissioning Results of the LHC Cryogenic System

    CERN Document Server

    Claudet, S

    2006-01-01

    The cryogenic system of the Large Hadron Collider (LHC) will be, upon its completion in 2006, the largest in the world in terms of refrigeration capacity with an equivalent to 144 kW at 4.5 K, about 400'000 litres of superfluid helium with 25 km of superconducting magnets below 2 K leading to a cryogen inventory of 100 tons of helium. The challenges involved in the design, construction and installation, as well as the first commissioning results will be addressed in this talk. Particular mention will be made of the problems encountered and how they were or are being solved. Perspectives for LHC will be presented. General considerations for future large cryogenic systems will be briefly proposed.

  8. Activities of the TUV experts during the period of construction and commissioning of a nuclear power plant ordered by the licensing authorities of the FRG

    International Nuclear Information System (INIS)

    Dommke, J.; Fendler, H.

    1977-01-01

    The inspection organisations in the Federal Republic of Germany (Technische Uberwachungs-Vereine) are independent systems grouped on a regional basis. The competent licensing authorities of the various Lander consult them concerning assessments for site selection and the design, construction, commissioning and operation of nuclear power plants. Furthermore the TUV experts inspect the manufacture of components in the suppliers' facilities and on site. (NEA) [fr

  9. Operational accidents and radiation exposure experience within the United States Atomic Energy Commission, 1943--1975

    International Nuclear Information System (INIS)

    1975-01-01

    The occupational injury and fatality experience during 32 years of the development of the atomic energy industry under the direction of the Atomic Energy Commission (AEC) and its predecessor, the Manhattan Engineering District, is reviewed. Data are included on the cause of all accidents, including fires and transportation accidents, and the cost of AEC property damage. Fatalities of AEC and contractor personnel from all causes during the 32-year period totaled 321, of which 184 occurred in construction; 121 in AEC operations such as production, research, and services; and 16 in Government functions. There were 19,225 lost-time injuries attributable to all accidental causes, or a 32-year frequency rate of 2.75 based on the number of injuries per million man-hours. There were six deaths attributable to nuclear causes, thee of which were due to blast and flying missiles and three caused by whole-body radiation exposure. Forty-one workers were involved in lost-time radiation accidents, of whom 26 showed clinical manifestations attributable to radiation, resulting in permanent partial-disability of three workers and the loss of a digit by four workers, while the others did not develop evidence of radiation injury

  10. BR3/Vulcain Nuclear Power Station. Construction and Operational Experience

    Energy Technology Data Exchange (ETDEWEB)

    Storrer, J. [Belgonucleaire, S.A., Brussels (Belgium)

    1968-04-15

    A full-scale reactor experiment was set out as the main objective of the Vulcain research and development programme agreed in May 1962 between the UKAEA and BelgoNucleaire, manager of ''Syndicat Vulcain''. Vulcain uses variable moderation as the long-term method to control reactivity: the reactor is cooled and moderated by a mixture of heavy and light water, the D{sub 2}O content being stepwise reduced to permit power operation with all control rods completely out of the core. To carry out the Vulcain power experiment it was decided to modify the BR3 nuclear power plant located at Mol, Belgium, which had operated from 1962 to 1964 as a conventional PWR with outputs of 40.9 MW(th) and 11.45 MW(e). The BR3/Vulcain plant was started in December 1966 and since then is running with a load factor around 90%. It is the first time that such a reactor type has been built and operated and the experience gained by its design, construction, commissioning and operation has proven to be most valuable. D{sub 2}O is being used at a pressure (2000 lb/in{sup 2} abs.) never before achieved in a heavy-water reactor and the leak rate from the HP primary systems to the atmosphere has been kept to a negligible value, around 1 to 2 grams/h. Commissioning of the primary plant had been carried out with light water first without fuel, and thereafter with fuel, at which time the water was poisoned with boric acid. The reactor vessel contains experimental devices such as 65 in-pile instrumentation detectors and four hydraulically operated Zircaloy control rods. They required the interposition of a collar between the vessel and its lid. Refuelling is performed under boronated light water, the interchange between the primary water and the H{sub 2}O being carried out by means of a draining and spraying system. The reactor had been operated for two years before its modifications for Vulcain: many lessons have therefore been learned about working on irradiated systems. The BR3/Vulcain core has a

  11. CMS operations for Run II preparation and commissioning of the offline infrastructure

    CERN Document Server

    Cerminara, Gianluca

    2016-01-01

    The restart of the LHC coincided with an intense activity for the CMS experiment. Both at the beginning of Run II in 2015 and the restart of operations in 2016, the collaboration was engaged in an extensive re-commissioning of the CMS data-taking operations. After the long stop, the detector was fully aligned and calibrated. Data streams were redesigned, to fit the priorities dictated by the physics program for 2015 and 2016. A new reconstruction software (both online and offline) was commissioned with early collisions and further developed during the year. A massive campaign of Monte Carlo production was launched, to assist physics analyses. This presentation reviews the main event of this commissioning journey and describes the status of CMS physics performances for 2016.

  12. National symposium on commissioning and operating experiences in heavy water plants and associated chemical industries [Preprint volume

    International Nuclear Information System (INIS)

    1992-02-01

    A symposium on commissioning and operating experiences in heavy water plants and associated chemical industries (SCOPEX-92) was organised to share the experience and exchange the ideas among plant operators, designers, consultants and vendors in the areas of operation, commissioning and equipment performance. This pre-print volume has been brought out as an integrated source of information on commissioning and operation of heavy water plants. The following aspects of heavy water plants are covered: commissioning and operation, instrumentation and control, and safety and environment. (V.R.)

  13. Experience gained during commissioning and trial operation of Mochovce Nuclear Power Plant

    International Nuclear Information System (INIS)

    GaL, P.; Adamica, T.; Marosik, V.; Rehak, A.

    2000-01-01

    In this paper authors describe the experience gained during commissioning and trial operation of Mochovce NPP (EMO). The first year of EMO operation from the point of view of safety and reliability was successful. Evidently we were challenged with certain problems characteristic to this stage of operation which resulted in automatic reactor shutdown. There were 11 automatic shutdowns in 1998 by action of the quick emergency protection AO-1 and two manual shutdowns by the AO-1 key. In 1999, there were 6 automatic shutdowns by action of the quick emergency protection AO-1. Three of them was connected to the falsely activated binary signal of MCP switch of, in two cases the reason came out from the turbo-generator (TG) cooling water system. Very positive trend in the operation of both units shows the fact that during all commissioning period of the second unit there were only three automatic reactor shutdowns by the signal AO-1. All these actions were done in frame of commissioning tests. All causes which activated the automatic unit shutdowns were found out and rectified, the overall tuning of the cooling water system is on the process now. The solution of this problem is possible only power commissioning, and in the stage of the trial operation had no direct impacts on the nuclear, radiation, or technical safety respectively. In 1998 two events according to the INES scale after second unit commissioning because of two unit links of the cooling water system. The operational events during the commissioning tests, start-up tests, physical commissioning, were ranked the category 1 ('Action of SIS U040 p po <8,34 MPa at the system 2 and 3' and 'Breaching the L and C'). In 1999 only events occurred that were ranked in the category safety insignificant events and lower (category 0, or off the scale respectively). In the frame of the safety culture principles adopted, such as critical attitude, exact and careful approach, and communication, these problems were given the

  14. Advanced construction management for lunar base construction - Surface operations planner

    Science.gov (United States)

    Kehoe, Robert P.

    1992-01-01

    The study proposes a conceptual solution and lays the framework for developing a new, sophisticated and intelligent tool for a lunar base construction crew to use. This concept integrates expert systems for critical decision making, virtual reality for training, logistics and laydown optimization, automated productivity measurements, and an advanced scheduling tool to form a unique new planning tool. The concept features extensive use of computers and expert systems software to support the actual work, while allowing the crew to control the project from the lunar surface. Consideration is given to a logistics data base, laydown area management, flexible critical progress scheduler, video simulation of assembly tasks, and assembly information and tracking documentation.

  15. Design, construction and commissioning of SGPR, the fast protection system of RFX

    International Nuclear Information System (INIS)

    Collarin, P.; Trevisan, F.; Guarnieri, M.

    1994-01-01

    RFX, the largest machine for magnetic confinement of plasmas in the RFP line, is provided with a system named SGPR specifically designed for the machine global protection against fast faults which can develop in the plasma, in the windings, in the power supply circuits and in the control system. SGPR is a cabled logic HLL machine, able to organise in few tens of microseconds coordinated machine protection, dealing with more than forty fault signals and activating almost thirty protection commands. SGPR design, manufacture and test program conform the quality control criteria necessary to assure the required high reliability. After a careful and cumbersome commissioning work the system has assumed its protection role. Up to now it has been called to a number of interventions which, even if never due to major faults, have shown its capability of proper operation

  16. Design, construction and commissioning of SGPR, the fast protection system of RFX

    Energy Technology Data Exchange (ETDEWEB)

    Collarin, P.; Trevisan, F. [Instituto Gas Ionizzati del CNR, Padova (Italy); Guarnieri, M. [Universita di Padova (Italy)

    1994-11-01

    RFX, the largest machine for magnetic confinement of plasmas in the RFP line, is provided with a system named SGPR specifically designed for the machine global protection against fast faults which can develop in the plasma, in the windings, in the power supply circuits and in the control system. SGPR is a cabled logic HLL machine, able to organise in few tens of microseconds coordinated machine protection, dealing with more than forty fault signals and activating almost thirty protection commands. SGPR design, manufacture and test program conform the quality control criteria necessary to assure the required high reliability. After a careful and cumbersome commissioning work the system has assumed its protection role. Up to now it has been called to a number of interventions which, even if never due to major faults, have shown its capability of proper operation.

  17. Commissioning and early operating experience with the Fermilab horizontal test facility

    Energy Technology Data Exchange (ETDEWEB)

    Carcagno, R.; Chase, B.; Harms, E.; Hocker, A.; Prieto, P.; Reid, J.; Rowe, A.; Theilacker, J.; Votava, M.; /Fermilab

    2007-10-01

    Fermilab has constructed a facility for testing dressed superconducting radiofrequency (RF) cavities at 1.8 K with high-power pulsed RF. This test stand was designed to test both 9-cell 1.3 GHz TESLA-style cavities and 9-cell 3.9 GHz cavities being built by Fermilab for DESY's TTF-FLASH facility. An overview of the test stand and a description of its initial commissioning is described here.

  18. Report on the behalf of the Commission for Foreign Affairs on: - the bill project, adopted by the Senate, authorizing the ratification of the Convention related to the construction and the exploitation of a European free electron laser operating in the X-ray range, and - the bill project, adopted by the Senate, authorizing the approval of the convention related to the construction and the exploitation of an infrastructure for the research on anti-protons and ions in Europe - Nr 1165 and Nr 1166 and appendix: text by the Commission for Foreign Affairs

    International Nuclear Information System (INIS)

    Baumel, Philippe

    2013-01-01

    This report first discusses how these two conventions (the one related to the construction and the exploitation of a European free electron laser operating in the X-ray range (in Hamburg, DE), and the one related to the construction and the exploitation of an infrastructure for the research on anti-protons and ions in Europe (in Darmstadt, DE)) will allow the French scientific community to access advanced infrastructures. It presents these infrastructures and outlines the several application perspectives, i.e. for the FAIR project and the European XFEL project. It comments the similar construction and exploitation conditions in terms of statutes (for the FAIR and XFEL companies, and for the personnel), and outlines that the financial burden will be governed and limited as far as the construction as well as the exploitation costs are concerned

  19. Commissioning and operational results of the 12 GeV helium compression system at Jlab

    Energy Technology Data Exchange (ETDEWEB)

    Knudsen, Peter N. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Ganni, Venkatarao [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Dixon, Kelly D. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Norton, Robert O. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Creel, Jonathan D. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

    2015-12-01

    The new compressor system at Jefferson Lab (JLab) for the 12 GeV upgrade was commissioned in the spring of 2013 and incorporates many design changes, discussed in previous publications, to improve the operational range, efficiency, reliability and maintainability as compared to previous compressor skids used for this application. The 12 GeV helium compression system has five compressors configured with four pressure levels supporting three pressure levels in the new cold box. During compressor commissioning the compressors were operated independent of the cold box over a wide range of process conditions to verify proper performance including adequate cooling and oil removal. Isothermal and volumetric efficiencies over these process conditions for several built-involume ratios were obtained. This paper will discuss the operational envelope results and the modifications/improvements incorporated into the skids.

  20. Experience in construction and operation of HWR plants in Argentina

    International Nuclear Information System (INIS)

    Madero, C.C.; Cosentino, J.O.

    1982-01-01

    ''ATUCHA I'', the first nuclear power plant in Argentina, is in commerical operation since 1974 with a high capacity factor. The reactor is based on the MZFR prototype designed by SIEMENS with natural uranium and heavy water and PWR technic. The plant was built by SIEMENS on a turnkey contract and was rated 340 MWe. The offer presented in that opportunity by KWU was based on two reactors (ATUCHA I type) inside one single containment, due to the limitation in power of the reactor. Subsequent changes in the nature of the contract resulted in an active participation of CNEA engineering groups in the erection and commissioning of the reactor. In 1978 the national government approved a nuclear power plan to install four 600 MWe HWR plants until 1995. To start implementing this program, CNEA called for tenders for the supply of components and services for the ATUCHA II plant, in connection with the establishment of a local engineering company and the supply and construction of a heavy water production plant. In 1980 a contract was signed with KWU and the local company ENACE was formed to act as architect engineer and site coordinator. The plant will be located in the ATUCHA I site and the reactor will be similar but double in power to that one. Following the schedule of the nuclear plan, CNEA has just started preliminary studies for the next nuclear plant. ENACE will be responsible for the preparation of an offer for an ATUCHA reactor type. Local engineering and manufacturing firms, upon request and coordination from CNEA, and evaluating the local capacity to participate in the design and construction of a CANDU type nuclear plant. Final decision on this fourth nuclear plant in Argentina will be taken middle 1983. (J.P.N.)

  1. Ten years of cryo-magnetic W7-X test facility construction and operation

    International Nuclear Information System (INIS)

    Renard, B.; Dispau, G.; Donati, A.; Genini, L.; Gournay, J.F.; Kuster, O.; Molinie, F.; Schild, T.; Touzery, R.; Vieillard, L.; Walter, C.

    2011-01-01

    The construction, commissioning, and operation phases of the W7-X cryo-magnetic test facility in CEA Saclay lasted ten years. The large diversity of equipments called, specialties involved and problems solved attest the expertise that was required to operate the test facility and test the coils. Nearly one hundred cryogenic tests were performed on the seventy W7-X coils, at a rate always increasing, using two cryostats each holding two coils. This paper presents the test facility and its operation first, the cryogenic difficulties that were confronted with their solutions, the electro-magnetic difficulties encountered along with corrective actions, and finally the instrumentation and data acquisition aspects. (authors)

  2. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    Science.gov (United States)

    DeGraff, B.; Howell, M.; Kim, S.; Neustadt, T.

    2017-12-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinney pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.

  3. SNS Cryogenic Test Facility Kinney Vacuum Pump Commissioning and Operation at 2 K

    Energy Technology Data Exchange (ETDEWEB)

    Degraff, Brian D. [ORNL; Howell, Matthew P. [ORNL; Kim, Sang-Ho [ORNL; Neustadt, Thomas S. [ORNL

    2017-07-01

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) has built and commissioned an independent Cryogenic Test Facility (CTF) in support of testing in the Radio-frequency Test Facility (RFTF). Superconducting Radio-frequency Cavity (SRF) testing was initially conducted with the CTF cold box at 4.5 K. A Kinney vacuum pump skid consisting of a roots blower with a liquid ring backing pump was recently added to the CTF system to provide testing capabilities at 2 K. System design, pump refurbishment and installation of the Kinney pump will be presented. During the commissioning and initial testing period with the Kinney pump, several barriers to achieve reliable operation were experienced. Details of these lessons learned and improvements to skid operations will be presented. Pump capacity data will also be presented.

  4. Knowledge transfer from building operation to construction

    DEFF Research Database (Denmark)

    Jensen, Per Anker; Chatzilazarou, Stamatia

    2017-01-01

    Purpose: To investigate how knowledge that derives from operation and maintenance of buildings can be stored and transferred in order to be reused in a future building project? Design/methodology/approach: The paper is theoretically based on knowledge management with a particular focus...... on interdepartmental knowledge transfer between departments responsible for operation and management and departments responsible for building projects in organisations with large and fast changing building portfolios. The paper includes a case study of the FM organisation of the Technical University of Denmark...... with data collection mainly by interviews with managers and staff in the relevant departments in this organisation. Findings: The case organisation seems to be aware of the importance of sharing and transferring their organisational knowledge. Over the last five years, the organisation has developed...

  5. Construction Operations Building Information Exchange (COBIE)

    Science.gov (United States)

    2007-06-01

    Swalley U.S. Department of State, Overseas Buildings Operations Toby Wilson U.S. Army, Corps of Engineers, Engineer R&D Center Jeff Wix AEC3 The...exchanged in COBIE. To map those information exchanges to the IFC model, the Information Delivery Manual (IDM) process [ Wix 2007] was also used. The...Folksonomy. Wikimedia Foundation. http://en.wikipedia.org/wiki/Folksonomy/, accessed 3 August 2007. Wix , Jeffrey. 2007. Information Delivery Manual

  6. Construction and commissioning of a hadronic test-beam calorimeter to validate the particle-flow concept at the ILC

    Energy Technology Data Exchange (ETDEWEB)

    Groll, M.

    2007-06-15

    This thesis discusses research and development studies performed for a hadronic calorimeter concept for the International Linear Collider (ILC). The requirements for a detector for the ILC are de ned by the particle-ow concept in which the overall detector performance for jet reconstruction is optimised by reconstructing each particle individually. The calorimeter system has to have unprecedented granularity to ful l the task of shower separation. The validation of the shower models used to simulate the detector performance is mandatory for the design and optimisation of the ILC detector. The construction and operation of a highly granular test-beam system will serve as a tool for this validation. This motivates the urgent need of research and development on calorimeter prototypes. One possible realisation of the hadronic calorimeter is based on a sampling structure of steel and plastic scintillator with analogue readout, where the sensitive scintillator layers are divided into tiles. A newly developed silicon based photo-detector (SiPM) o ers the possibilities to design such a system. The SiPM is a multi-pixel avalanche photo-diode operated in Geiger mode. Due to its small dimensions it is possible to convert the light produced in the calorimeter to an electronic signal already inside the calorimeter volume. The basic developments on scintillator, tile and photo-detector studies provide the basis for prototype construction. The main part of this thesis will discuss the construction and rst commissioning of an analogue hadronic calorimeter prototype consisting of 8000 channels read out with SiPMs. The smallest calorimeter unit is the tile system including the SiPM. The production and characterisation chain of this unit is an essential step in the construction of a large scale prototype. These basic units are arranged on readout layers, which are already a multi-channel system of 200 channels. In addition, the new photo-detector requires dedicated readout

  7. Construction and commissioning of a hadronic test-beam calorimeter to validate the particle-flow concept at the ILC

    International Nuclear Information System (INIS)

    Groll, M.

    2007-06-01

    This thesis discusses research and development studies performed for a hadronic calorimeter concept for the International Linear Collider (ILC). The requirements for a detector for the ILC are de ned by the particle-ow concept in which the overall detector performance for jet reconstruction is optimised by reconstructing each particle individually. The calorimeter system has to have unprecedented granularity to ful l the task of shower separation. The validation of the shower models used to simulate the detector performance is mandatory for the design and optimisation of the ILC detector. The construction and operation of a highly granular test-beam system will serve as a tool for this validation. This motivates the urgent need of research and development on calorimeter prototypes. One possible realisation of the hadronic calorimeter is based on a sampling structure of steel and plastic scintillator with analogue readout, where the sensitive scintillator layers are divided into tiles. A newly developed silicon based photo-detector (SiPM) o ers the possibilities to design such a system. The SiPM is a multi-pixel avalanche photo-diode operated in Geiger mode. Due to its small dimensions it is possible to convert the light produced in the calorimeter to an electronic signal already inside the calorimeter volume. The basic developments on scintillator, tile and photo-detector studies provide the basis for prototype construction. The main part of this thesis will discuss the construction and rst commissioning of an analogue hadronic calorimeter prototype consisting of 8000 channels read out with SiPMs. The smallest calorimeter unit is the tile system including the SiPM. The production and characterisation chain of this unit is an essential step in the construction of a large scale prototype. These basic units are arranged on readout layers, which are already a multi-channel system of 200 channels. In addition, the new photo-detector requires dedicated readout

  8. Recovery Act: Training Curriculum Development for Building Equipment Technicians, Operators, and Commissioning Agents/Auditors

    Energy Technology Data Exchange (ETDEWEB)

    Jacobsen, Joseph; Yu, David

    2012-08-04

    This US DOE funded project produced ten advanced energy engineering technology courses where students learn about the latest technologies and practices in the energy industry to reduce energy use in residential, commercial and industrial settings, accounting for over 50% of the world’s energy use. A geothermal and a solar thermal system were installed and commissioned as part of this project, an MATC’s cost share. An innovative intelligent lighting lab was installed, complete with course content as well as innovative academic pathway construction, laddering students from the 2-year technical college to the 4-year engineering school.

  9. ARIEL E-linac Cryogenic System: Commissioning and First Operational Experience

    International Nuclear Information System (INIS)

    Koveshnikov, A; Bylinskii, I; Hodgson, G; Kishi, D; Laxdal, R; Ma, Y; Nagimov, R; Yosifov, D

    2015-01-01

    The Advanced Rare IsotopE Laboratory (ARIEL) is a major expansion of the Isotope Separator and Accelerator (ISAC) facility at TRIUMF. A key part of the ARIEL project is a 10 mA 50 MeV continuous-wave superconducting radiofrequency (SRF) electron linear accelerator (e-linac). The 1.3 GHz SRF cavities are operated at 2 K. HELIAL LL helium liquefier by Air Liquide Advanced Technologies (ALAT) with a tuneable liquid helium (LHe) production was installed and commissioned in Q4’2013 [1]. It provides 4 K liquid helium to one injector and one accelerator cryomodules that were installed and tested in 2014. The 4 K to 2 K liquid helium transition is achieved on-board of each cryomodule. The cryoplant, LHe and LN2 distributions, sub-atmospheric (S/A) system and cryomodules were successfully commissioned and integrated into the e-linac cryogenic system. Required pressure regulation for both 4 K cryoplant in the Dewar and 2 K with the S/A system was achieved under simulated load. Final integration tests confirmed overall stable performance of the cryogenic system with two cryomodules installed. The paper presents details of the cryogenic system commissioning tests as well as highlights of the initial operational experience. (paper)

  10. Commissioning and operational scenarios of the LHC beam loss monitor system

    International Nuclear Information System (INIS)

    Holzer, E.B.

    2007-01-01

    One of the most critical elements for the protection of CERN's Large Hadron Collider (LHC) is its beam loss monitoring (BLM) system. It must prevent quenches in the super conducting magnets and damage of machine components due to beam losses. The contribution will discuss the commissioning procedures of the BLM system and envisaged operational scenarios. About 4000 monitors will be installed around the ring. When the loss rate exceeds a predefined threshold value, a beam abort is requested. Magnet quench and damage levels vary as a function of beam energy and loss duration. Consequently, the beam abort threshold values vary accordingly. By measuring the loss pattern, the BLM system helps to identify the loss mechanism. Furthermore, it will be an important tool for commissioning, machine setup and studies. Special monitors will be used for the setup and control of the collimators. (author)

  11. Operating experience and construction status of ATLAS

    International Nuclear Information System (INIS)

    Pardo, R.C.; DenHartog, P.; Shepard, K.W.; Zinkann, G.

    1984-01-01

    The present Argonne Tandem-Linac accelerator has operated in a reliable manner during the past year. The accelerator system provided 4402 hours of experimental beam time with a wide variety of heavy-ions. Figure 1 shows the beams which have been provided during the past year. New beams accelerated by the linac include 300 MeV 82 Se and 390 MeV 109 Ag. In tests, the tandem accelerated 102 MeV 127 I. This is the heaviest beam ever accelerated by the Argonne tandem. The long-term performance of the niobium resonators appears to be good. No significant degradation of performance has been observed for most resonators over many years of use with the exceptions of problems caused by catastrophic vacuum accidents. Resonators whose performance has deteriorated after vacuum accidents have recently been restored to their original performance state by a simple technique. The technique used is to rinse the interior of the resonator with a sequence of baths of solvents and water

  12. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements (Arabic Edition)

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe commissioning, operation, and transition from operation to decommissioning of nuclear power plants. Over recent years there have been developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis review and risk informed decision making processes. It became necessary to revise the IAEA’s Safety Requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications, initiated in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan, revealed no significant areas of weakness but resulted in a small set of amendments to strengthen the requirements and facilitate their implementation. These are contained in the present publication.

  13. Installation and commissioning of operation nuclear power plant reactor protection system modernization project

    International Nuclear Information System (INIS)

    Lu Weiwei

    2010-01-01

    Qinshan Nuclear Power Plant is the first nuclear power plant in mainland China; it is also the first one which realizes the modernization of analog technology based Reactor Protection System in the operation nuclear power plant of China. The implementation schedule is the shortest one which use same digital technology platform (TELEPERM XS of AREVA NP) to modifying the safety class I and C system in the world, the whole project spent 28 months from equipment contract signed to putting system into operation. It open up a era for operation nuclear power plant using mature digital technology to make safety class I and C system modernization in China. The important practical significance of this successful project is very obvious. This article focus on two important project stage--equipment installation and system commissioning, it is based on a large number of engineering implementation fact, it covers the problems and solutions happened during the installation and commission. The purpose of the article is to share the experience and lessons of safety I and C system modernization for other operation nuclear power plant. (authors)

  14. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2017-01-01

    This publication is a revision of IAEA Safety Standards Series No. NS-R-2, Safety of Nuclear Power Plants: Operation, and has been extended to cover the commissioning stage. It describes the requirements to be met to ensure the safe commissioning, operation, and transition from operation to decommissioning of nuclear power plants. Over recent years there have been developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis review and risk informed decision making processes. It became necessary to revise the IAEA’s Safety Requirements in these areas and to correct and/or improve the publication on the basis of feedback from its application by both the IAEA and its Member States. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications, initiated in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan, revealed no significant areas of weakness but resulted in a small set of amendments to strengthen the requirements and facilitate their implementation. These are contained in the present publication.

  15. Commissioning and Operation of the FNAL Front end Injection Line and Ion Sources.

    Energy Technology Data Exchange (ETDEWEB)

    Karns, Patrick R. [Indiana Univ., Bloomington, IN (United States)

    2015-09-01

    This thesis documents the efforts made in commissioning and operating the RFQ Injection Line (RIL) as a replacement for the Cockcroft Walton front end. The Low Energy Beam Transport (LEBT) was assembled and tested with multiwire position and emittance monitor measurements. The Radio Frequency Quadrupole (RFQ) commissioning was completed with the same measurements as well as output beam energy measurements that showed it initially accelerated beam only to 700 keV, which was 50 keV lower than the design energy. Working with the manufacturer solutions were found and instituted to continue testing. The Medium Energy Beam Transport (MEBT) was then connected as the RIL was installed as the new front end of Linac. Testing gave way to operation when the new front end was used as the source of all High Energy Physics (HEP) beam for Fermi National Accelerator Laboratory (FNAL). The magnetron ion source that provides the H- beam for the front end required several changes and eventual upgrades to operate well; such as new source operating points for vacuum pressure and cesium admixture, and new materials for critical source components. Further research was conducted on the cathode geometry and nitrogen doping of the hydrogen gas as well as using solid state switches for the extractor system high voltage.

  16. Night-time road construction operations synthesis of practice.

    Science.gov (United States)

    2008-05-01

    report synthesizes existing literature on nighttime construction operations, identifies gaps in the current state of knowledge, and summarizes research in progress studies that are planned or underway. The literature review and synthesis found the fo...

  17. Design, construction and operation features of high-rise structures

    Science.gov (United States)

    Mylnik, Alexey; Mylnik, Vladimir; Zubeeva, Elena; Mukhamedzhanova, Olga

    2018-03-01

    The article considers design, construction and operation features of high-rise facilities. The analysis of various situations, that come from improper designing, construction and operation of unique facilities, is carried out. The integrated approach is suggested, when the problems of choosing acceptable constructional solutions related to the functional purpose, architectural solutions, methods of manufacturing and installation, operating conditions for unique buildings and structures are being tackled. A number of main causes for the emergency destruction of objects under construction and operation is considered. A number of measures are proposed on the basis of factor classification in order to efficiently prevent the situations, when various negative options of design loads and emergency impacts occur.

  18. 25 CFR 502.22 - Construction and maintenance of the gaming facility, and the operation of that gaming is...

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction and maintenance of the gaming facility, and the operation of that gaming is conducted in a manner which adequately protects the environment and the public health and safety. 502.22 Section 502.22 Indians NATIONAL INDIAN GAMING COMMISSION...

  19. Report to the US Nuclear Regulatory Commission on Analysis and Evaluation of Operational Data, 1987: Nonreactors

    International Nuclear Information System (INIS)

    1988-10-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1987. The report is published in two volumes. NUREG-1272, Vol. 2, No. 1, covers Power Reactors and presents an overview of the operating experience of the nuclear power industry, with comments regarding the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from Licensee Event Reports, the NRC's Operations Center, and Diagnostic Evaluations. NUREG-1272, Vol. 2, No. 2, covers Nonreactors and presents a review of the nonreactor events and misadministration reports that were reported in 1987 and a brief synopsis of AEOD studies published in 1987. Each volume contains a list of the AEOD reports issued for 1980-1987

  20. Commissioning methods applied to the Hunterston 'B' AGR operator training simulator

    International Nuclear Information System (INIS)

    Hacking, D.

    1985-01-01

    The Hunterston 'B' full scope AGR Simulator, built for the South of Scotland Electricity Board by Marconi Instruments, encompasses all systems under direct and indirect control of the Hunterston central control room operators. The resulting breadth and depth of simulation together with the specification for the real time implementation of a large number of highly interactive detailed plant models leads to the classic problem of identifying acceptance and acceptability criteria. For example, whilst the ultimate criterion for acceptability must clearly be that within the context of the training requirement the simulator should be indistinguishable from the actual plant, far more measurable (i.e. less subjective) statements are required if a formal contractual acceptance condition is to be achieved. Within the framework, individual models and processes can have radically different acceptance requirements which therefore reflect on the commissioning approach applied. This paper discusses the application of a combination of quality assurance methods, design code results, plant data, theoretical analysis and operator 'feel' in the commissioning of the Hunterston 'B' AGR Operator Training Simulator. (author)

  1. Experience in Cuba in the licensing during import, commissioning and operation of an Irradiator LLCo ISOGAMMA

    International Nuclear Information System (INIS)

    Forteza, Yamil Lopez; Reyes, Yolanda Perez; Garcia, Jose R. Quevedo; Molina, Igor I. Sarabia; Gonzalez, Leonel Omarovich; Zubiaur, Omar Cruz

    2013-01-01

    This work presented the experiences during the process of licensing an irradiator ISOGAMMA LLCo model according to the recommendations of the International Atomic Energy (IAEA). Aspects of the safety assessment are detailed, as well as control and verification requirements for radiation safety and security at different stages of the process (import, transportation, installation irradiator loading 60Co sources, commissioning and operation) of irradiator recently installed in Cuba. The results of the evaluation carried a source of reference and consultation necessary for the work of the regulator to consider for similar processes that lie ahead in other facilities irradiation

  2. Construction, testing, and initial operation of Fort St. Vrain PCRV

    International Nuclear Information System (INIS)

    Ople, F.S. Jr.; Neylan, A.J.

    1975-01-01

    The Fort St. Vrain (FSV) Nuclear Generating Station is the first station in the USA to use a prestressed concrete reactor vessel (PCRV). The PCRV was designed and constructed by General Atomic. Construction of the PCRV was completed in 1970; the pressure and leak tests were completed in 1971. The structural behavior of the PCRV has been monitored by installed instrumentation since start of construction. The highlights of the actual construction, testing, and initial operation of the PCRV, including a comparison of structural behavior, where possible, between observed data and analytical predictions. (U.S.)

  3. Fermionic construction of vertex operators for twisted affine algebras

    International Nuclear Information System (INIS)

    Frappat, L.; Sorba, P.; Sciarrino, A.

    1988-03-01

    We construct vertex operator representations of the twisted affine algebras in terms of fermionic (or parafermionic in some cases) elementary fields. The folding method applied to the extended Dynkin diagrams of the affine algebras allows us to determine explicitly these fermionic fields as vertex operators

  4. Experience from the construction and operation of Tarapur and Rajasthan Nuclear Power Stations

    International Nuclear Information System (INIS)

    Shah, J.C.; Pardiwala, T.F.; Kothare, V.V.; Rao, M.H.P.; Nanjundeswaran, K.

    1977-01-01

    India's experience in construction and operation of nuclear power stations so far covers two BWR and four PHWR Units in three power stations. Two more PHWR units are at an early stage of construction. The twin unit Tarapur Station (2x210 MWe BWR) was built as a turnkey project which restricted participation of Indian engineers in design and construction considerably. The contrasting approach adopted for Rajasthan Station (2x220 MWe PHWR) involved Indian personnel and contractors fully in construction and commissioning, with Canadians providing supervisory assistance in Rajasthan I and essentially consultative help for Rajasthan II. Subsequent stations are wholly Indian efforts. Tarapur went into commercial operation in 1969, 60 months after breaking of ground. Construction was essentially uneventful, major problems faced being stress corrosion induced cracks in the reactor lining and complete change of steam generator tubes. In its seven years of operations, Tarapur has faced several problems mainly arising from rather early designs, indifferent fuel performance, constraints of twin-unit approach and operations in an inadequately developed grid system apart from those generally stemming from assimilation of an advanced technology in a developing country. The Station has undergone six refuellings during this period. Most of the problems have been overcome by design changes, system augmentations and experience and the Station operation since mid 1974 have generally been steady at around 90% of the rated capacity. Construction of Rajasthan I at a remote and isolated site proceeded relatively slowly. Local availability of skilled and semi-skilled manpower was poor, affecting construction. Inadequate roads impeded movements of overdimensioned components. Observing strict Quality Assurance standards required several major rectifications at site. Rajasthan I went on line in 1973 after overcoming major turbine bearing problems during commissioning. Since then, while

  5. AN ACD DIAGRAM DEVELOPED FOR SIMULATING A BRIDGE CONSTRUCTION OPERATION

    Directory of Open Access Journals (Sweden)

    Fahimeh Zaeri

    2014-12-01

    Full Text Available Success in the performance of construction projects can be substantially enhanced if plans are formulated more realistically, ahead of time. Planning includes identifying project activities, required resources, interdependencies, and also recognizing the uncertainties in the duration of activities. Inherent features of construction projects, such as high repetition, complexity and uniqueness on the one hand, and advances in technology and methodologies on the other, create more difficulties in planning construction delivery. This is true for bridge operations. This study presents an innovative incremental beam launching method with twin truss gantry. This construction method has significant advantages in terms of cost and speed of performance, but increases the level of planning and management required for the bridge operation. Further, because of the newness of the method, no specific Work Breakdown Structure nor conceptual framework has been developed as yet. The aim of the current study is to explore the use of a simulation-based tool (EZStrobe to facilitate the planning and management of a bridge construction operation (case study. The process followed in the development of a conceptual framework for the case study project is described. An Activity Cycle Diagram is produced alongside the conceptual framework and process models, with the intent of illustrating the key steps in the simulation modelling method. The developed models could assist in scheduling and controlling inherent construction features such as uncertainties, complexities, and repetitions in bridge construction projects, consequently improving their delivery.

  6. Report to the US Nuclear Regulatory Commission on Analysis and Evaluation of Operational Data, 1986

    International Nuclear Information System (INIS)

    1987-05-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during calendar year 1986. Comments and observations are provided on operating experience at nuclear power plants and other NRC licensees, including results from selected AEOD studies; summaries of abnormal occurrences involving US nuclear plants; reviews of licensee event reports and their quality, reactor scram experience from 1984 to 1986, engineered safety features actuations, and the trends and patterns analysis program; and assessments of nonreactor and medical misadministration events. In addition, the report provides the year-end status of all recommendations included in AEOD studies, and listings of all AEOD reports issued from 1980 through 1986

  7. The design, construction and commissioning of the CERN Large Electron-Positron collider

    International Nuclear Information System (INIS)

    Myers, S.; Picasso, E.

    1990-01-01

    A description is given of the most important parameters considered in the design of the CERN Large Electron-Positron collider. It is shown how these parameters affect the collider performance and how they have been optimised with respect to the cost of the project. The functioning of each major subsystem is described with respect to its role as part of the collider. Finally, the planning, testing and initial commissioning of LEP is described and possible future developments are outlined. (author)

  8. Construction and commissioning of workrooms for handling of unsealed radioactive materials

    International Nuclear Information System (INIS)

    Weinhold, G.; Jost, E.; Koenig, W.

    1976-03-01

    The requirements prescribed for planning, design and construction of type II and III workrooms for handling of unsealed sources are outlined. The 'Guide Concerning Construction and Equipment of Rooms for Handling of Radioactive Materials' is explained and supplemented in part. Furthermore, problems of radiation protection organization and measuring techniques are discussed. (author)

  9. Large Cryogenic Infrastructure for LHC Superconducting Magnet and Cryogenic Component Tests: Layout, Commissioning and Operational Experience

    International Nuclear Information System (INIS)

    Calzas, C.; Chanat, D.; Knoops, S.; Sanmarti, M.; Serio, L.

    2004-01-01

    The largest cryogenic test facility at CERN, located at Zone 18, is used to validate and to test all main components working at cryogenic temperature in the LHC (Large Hadron Collider) before final installation in the machine tunnel. In total about 1300 main dipoles, 400 main quadrupoles, 5 RF-modules, eight 1.8 K refrigeration units will be tested in the coming years.The test facility has been improved and upgraded over the last few years and the first 18 kW refrigerator for the LHC machine has been added to boost the cryogenic capacity for the area via a 25,000 liter liquid helium dewar. The existing 6 kW refrigerator, used for the LHC Test String experiments, will also be employed to commission LHC cryogenic components.We report on the design and layout of the test facility as well as the commissioning and the first 10,000 hours operational experience of the test facility and the 18 kW LHC refrigerator

  10. Design, construction and commissioning of the new solid waste management and storage facilities of Ignalina NPP, Lithuania

    Energy Technology Data Exchange (ETDEWEB)

    Goehring, R.; Wenninger, K. [RWE NUKEM GmbH, Alzenau (Germany)

    2006-04-15

    The contract for the design, construction and commissioning (turn-key) of the New Solid Waste Management and Storage Facilities (SWMSF) has been awarded to RWE NUKEM GmbH. The contract was signed on the 30.11.2005. The New Solid Waste Management and Storage Facilities (SWMSF) are financed by the Ignalina Decommissioning Support Fund which is managed by European Bank for Reconstruction and Development (EBRD). The new facilities are required on the Ignalina Nuclear Power Plant (INPP) in order to support ongoing decomissioning work, including removal of waste from existing waste storage buildings. (orig.)

  11. Health physics experience in commissioning and operation of radiation and air activity monitoring system at FBTR

    International Nuclear Information System (INIS)

    Raghunath, V.M.; Meenakshisundaram, V.; Viswanathan, S.; Bala Sundar, S.; Jose, M.T.; Suriyamurthy, N.; Ravi, T.; Subramanian, V.

    2001-01-01

    The Radiation and Air Activity Monitoring System (RAAMS) at Fast Breeder Test Reactor (FBTR) is meant to monitor and record the radiation and air activity levels at various potentially active areas in FBTR complex. Health Physics Group, FBTR was associated during commissioning of RAAMS in fixing the alarm settings for the monitors, their relocation and in formulating the surveillance procedures. The areas were surveyed to check for any release of activity for confirming the observed readings during operation of the reactor. In such cases, augmentation of shielding was recommended and was promptly implemented by the station management. The details of the long and fruitful experience gained by the Health Physics Group, FBTR are described in this paper. (author)

  12. The ATLAS trigger: high-level trigger commissioning and operation during early data taking

    International Nuclear Information System (INIS)

    Goncalo, R

    2008-01-01

    The ATLAS experiment is one of the two general-purpose experiments due to start operation soon at the Large Hadron Collider (LHC). The LHC will collide protons at a centre of mass energy of 14 TeV, with a bunch-crossing rate of 40 MHz. The ATLAS three-level trigger will reduce this input rate to match the foreseen offline storage capability of 100-200 Hz. This paper gives an overview of the ATLAS High Level Trigger focusing on the system design and its innovative features. We then present the ATLAS trigger strategy for the initial phase of LHC exploitation. Finally, we report on the valuable experience acquired through in-situ commissioning of the system where simulated events were used to exercise the trigger chain. In particular we show critical quantities such as event processing times, measured in a large-scale HLT farm using a complex trigger menu

  13. Construction and initial operation of the Advanced Toroidal Facility

    International Nuclear Information System (INIS)

    Bell, G.L.; Bell, J.D.; Benson, R.D.

    1989-08-01

    The Advanced Toroidal Facility (ATF) torsatron was designed on a physics basis for access to the second stability regime and on an engineering basis for independent fabrication of high-accuracy components. The actual construction, assembly, and initial operation of ATF are compared with the characteristics expected during the design of ATF. 31 refs., 19 figs., 2 tabs

  14. Design, construction and commissioning of the Thermal Screen Control System for the CMS Tracker detector at CERN

    CERN Document Server

    Carrone, E; Tsirou, A

    The CERN (European Organization for Nuclear Research) laboratory is currently building the Large Hadron Collider (LHC). Four international collaborations have designed (and are now constructing) detectors able to exploit the physics potential of this collider. Among them is the Compact Muon Solenoid (CMS), a general purpose detector optimized for the search of Higgs boson and for physics beyond the Standard Model of fundamental interactions between elementary particles. This thesis presents, in particular, the design, construction, commissioning and test of the control system for a screen that provides a thermal separation between the Tracker and ECAL (Electromagnetic CALorimeter) detector of CMS (Compact Muon Solenoid experiment). Chapter 1 introduces the new challenges posed by these installations and deals, more in detail, with the Tracker detector of CMS. The size of current experiments for high energy physics is comparable to that of a small industrial plant: therefore, the techniques used for controls a...

  15. Research Trends on Benefits of Implementing Constructability, Operability, and Maintainability

    Directory of Open Access Journals (Sweden)

    Kordestani Ghaleenoe, N.

    2017-07-01

    Full Text Available Despite allocating huge budgets to civil engineering projects, detailed planning, and employing human resources, project managers still face time, cost, and quality constraints. Most of these challenges are due to a lack of integration of different project phases and the limitations of the presence of construction and maintenance contractors in the initial stages of the project. Considering the benefits of applying constructability, operability, and maintainability (COM concepts, many problems caused by lack of coordination, or duplications and weakness in management, and also time and extra costs due to lack of presence of construction and maintenance contractors in the early stages of the project are resolvable. In this regard, various studies have investigated the benefits of applying these concepts; however, there has been no comprehensive analysis of the benefits of COM. As a result of focus on the benefits of implementation of these concepts and evaluating the effect of each of these strategies and benefits, from different perspectives during various time periods, managers can increase project efficiency and productivity, and improve their performance, through using concepts and strategies of their implementation. This research aims to evaluate the trend of studies on the benefits of implementing constructability, operability, and maintainability in the construction industry. For that, the in-depth literature review method is applied. For qualitative analysis of the obtained information, descriptive analysis has been used. Then, the data was coded, and classified using Excel Software for quantitative data analysis. Finally, the charts presented were evaluated according to the classified fields of study. The necessity of performing such a study is significant because of the fact that a large share of a project’s problems, such as lack of plans’ integration and weakness of administrative system, and increasing time and cost, are due to

  16. Commissioning and operating experience of compressed air system of a reprocessing plant (Paper No. 5.10)

    International Nuclear Information System (INIS)

    Nair, M.K.T.; Bajpai, D.D.; Mishra, A.K.; Kulkarni, H.B.; Raje, R.V.; Rajeshwar, S.

    1992-01-01

    Compressed air system is one of the most important utility systems, required in the continued operation of a radiochemical plant. Moisture and oil free compressed air is used in large scale for process control and process operations in reprocessing plants. Commissioning and operating experience of this system is described in detail, to indicate the importance of the system in the overall design and operation of such chemical plant. (author). 1 tab

  17. AUTOCAD IN THE OPERATIONAL MANAGEMENT OF THE CONSTRUCTION SITE

    Directory of Open Access Journals (Sweden)

    Tsareva Marina Vladimirovna

    2016-04-01

    Full Text Available Operational management of the construction is usually based on information analysis systems, which are aimed at the monitoring of working schedule and volumes as consistent with predicated schedules. The result of such systems’ operation is traditional information graphics (diagrams, charts, etc., which provides idea on the current state of the construction site and deviations from the planned settings. The author considers the visualization technology of construction of objects using an image of the situation on the AutoCAD drawings, converted into an interactive format. The article focuses on imperfections of the existing technologies of information support of the managers. The creation of unified IT platform is offered on the basis of CAD for creating an integrated information storage and visualization of the environment using electronic drawings and diagrams. Using interactive methods it is possible to illustrate the condition of almost any part of the construction project using these drawings and diagrams. E-drawings contain the basic information resources - estimates, plans, sections, specifications, technology, construction, etc. necessary for the calculation of indicators. The author proved that implementation of visualization is most efficient in case of electronic drawings in 3D format.

  18. 1980 Directory of Experts on Organization and Management of Construction/CIB W-65 Commission.

    Science.gov (United States)

    1981-02-02

    Juie I )7t) J,; o iri t An iiKoc h, The Rullr i Tenirn ogv i r.t 1hI r ir t ’’i tt - on tr hre ru It en 0 tt ts P h DOi 1fit I-s epr 1 𔃻 , i nrd Ma rin...Charge of Projects - Construction Company 1935 - 1939 Projects Design Engineer - Consultants Office PUBLICATIONS Pszenicid, M., Efficiency of System

  19. THE DETAILS OF CONSTRUCTION AND APPLICATION OF EUROPEAN COMMISSION MACROMODEL QUEST III WITH EXTENDED FISCAL BLOCK

    Directory of Open Access Journals (Sweden)

    I. Lukianenko

    2015-10-01

    Full Text Available In this paper we provide detailed derivation of dynamic stochastic general equilibrium model QUEST III that was developed under European Commission project. The principal feature of the model is the presence of both monetary and extended fiscal blocks. In particular, Central Bank sets interest rate using monetary policy rule, while fiscal sector is represented by taxes and transfers. It allows analyzing the effect of complex shocks on the key macroeconomic variables. Our results show that parallel application of monetary and fiscal instruments is an effective way to combat stagflation, i.e. drastic decrease in production and acceleration of inflation. Due to the presence of extended fiscal block, the model can fit Ukrainian economic and policy structure quick good. The next steps of the research may be calibration and estimation of QUEST III prototype on the Ukrainian data with potentially some modification and inclusion of banking and other sectors that play critical role in the local conditions. Monetary policy instruments should be extended with the level of Central Bank reserves which have large influence on macro stability. In addition, dollarization is an important peculiarity that should be addressed in the future versions of the model.

  20. Quality system applied to the development and operation of the environmental and internal dosimetry laboratory of the National Atomic Energy Commission

    International Nuclear Information System (INIS)

    Tossi, Mirta H.; Picardi, Haydee M.; Rona, Nicolas F.; Gonzalez, Maria I.; Cohen, Isaac M.

    1997-01-01

    The characteristics of the quality plan , applied to the project of construction, commissioning and operation of the Laboratory of Internal and Environmental Dosimetry of Comision Nacional de Energia Atomica, are described. The basic objectives are: to carry out the determination of plutonium, natural and enriched uranium in biological samples, involving the operation of five plants connected with the fuel cycles, and radionuclides in environmental samples; to achieve enough sensitivity in the methods, so as to detect trends which could require the application of corrective measures or, alternatively, the practices standardisation that contribute to an operation improvement; to adequate the laboratory, under full operation conditions, for inclusion in a dose evaluation and environmental monitoring integrated system. (author). 1 ref

  1. Design, construction and commissioning of a simple, low cost permanent magnet quadrupole doublet

    International Nuclear Information System (INIS)

    Conard, E.M.; Parcell, S.K.; Arnott, D.W.

    1999-01-01

    In the framework of new beam line developments at the Australian National Medical Cyclotron, a permanent magnet quadrupole doublet was designed and built entirely in house. The design proceeded from the classical work by Halbach et al. but emphasised the 'low cost' aspect by using simple rectangular NdFeB blocks and simple assembly techniques. Numerical simulations using the (2-D) Gemini code were performed to check the field strength and homogeneity predictions of analytical calculations. This paper gives the reasons for the selection of a permanent magnet, the design and construction details of the quadrupole doublet and its field measurement results. (authors)

  2. Oscillator construction of su(n|m) Q-operators

    Energy Technology Data Exchange (ETDEWEB)

    Frassek, Rouven, E-mail: rfrassek@physik.hu-berlin.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Max-Planck-Institut fuer Gravitationsphysik, Albert-Einstein-Institut, Am Muehlenberg 1, 14476 Potsdam (Germany); Lukowski, Tomasz, E-mail: lukowski@mathematik.hu-berlin.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Meneghelli, Carlo, E-mail: carlo@aei.mpg.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Max-Planck-Institut fuer Gravitationsphysik, Albert-Einstein-Institut, Am Muehlenberg 1, 14476 Potsdam (Germany); Staudacher, Matthias, E-mail: matthias@aei.mpg.de [Institut fuer Mathematik und Institut fuer Physik, Humboldt-Universitaet zu Berlin, Johann von Neumann-Haus, Rudower Chaussee 25, 12489 Berlin (Germany); Max-Planck-Institut fuer Gravitationsphysik, Albert-Einstein-Institut, Am Muehlenberg 1, 14476 Potsdam (Germany)

    2011-09-01

    We generalize our recent explicit construction of the full hierarchy of Baxter Q-operators of compact spin chains with su(n) symmetry to the supersymmetric case su(n|m). The method is based on novel degenerate solutions of the graded Yang-Baxter equation, leading to an amalgam of bosonic and fermionic oscillator algebras. Our approach is fully algebraic, and leads to the exact solution of the associated compact spin chains while avoiding Bethe ansatz techniques. It furthermore elucidates the algebraic and combinatorial structures underlying the system of nested Bethe equations. Finally, our construction naturally reproduces the representation, due to Z. Tsuboi, of the hierarchy of Baxter Q-operators in terms of hypercubic Hasse diagrams.

  3. The ALICE Transition Radiation Detector: construction, operation, and performance

    OpenAIRE

    Acharya, Shreyasi; Adam, Jaroslav; Ahmad, Nazeer; Bhattacharjee, Buddhadeb; Turrisi, Rosario; Tveter, Trine Spedstad; Ullaland, Kjetil; Umaka, Ejiro Naomi; Uras, Antonio; Usai, Gianluca; Utrobicic, Antonija; Vala, Martin; Van Der Maarel, Jasper; Van Hoorne, Jacobus Willem; Bhom, Jihyun

    2018-01-01

    The Transition Radiation Detector (TRD) was designed and built to enhance the capabilities of the ALICE detector at the Large Hadron Collider (LHC). While aimed at providing electron identification and triggering, the TRD also contributes significantly to the track reconstruction and calibration in the central barrel of ALICE. In this paper the design, construction, operation, and performance of this detector are discussed. A pion rejection factor of up to 410 is achieved at a momentum of 1 G...

  4. Commissioning and initial operation experience with ASDEX Upgrade's new real-time control and data acquisition

    International Nuclear Information System (INIS)

    Raupp, G.; Behler, K.; Cole, R.; Engelhardt, K.; Lohs, A.; Lueddecke, K.; Treutterer, W.; Neu, G.; Vijverberg, T.; Zasche, D.; Zehetbauer, Th.

    2006-01-01

    ASDEX Upgrade was equipped with a distributed real-time (RT) control and diagnostic system. Application processes can be freely mapped onto controllers. They communicate through RT data exchanged via a shared memory network. Processes run self-organized with a data-driven scheme, i.e. a process executes when all required data has become available and produced data drive other processes waiting for these. The process chain starts periodically through a time-synchronous cycle master process to deterministically execute closed-loop control. Generic processes were implemented for feedback of plasma position and shape, and for performance control with fuelling and heating systems, for evaluation and monitoring of plasma quantities and Tokamak components, and generation of reference values in RT. Upon commissioning the system was speed-optimized to run a 1.6 ms cycle. Methods to exchange data and time information in RT and operate distributed data-driven processes work efficiently and reliably. The ability to freely map processes to computing nodes and RT data to generic processes provides outstanding configurational flexibility for optimizing system performance or supporting in situ replay and simulation runs. In the computation of reference values in RT acting on underlying feedback controllers, demonstrated for soft-landing, we see great potential to counteract instabilities or optimize pulses

  5. Minimum Bias Trigger Scintillators for ATLAS: Commissioning and Run 2 Initial Operation

    CERN Document Server

    Dano Hoffmann, Maria; The ATLAS collaboration

    2015-01-01

    The Minimum Bias Trigger Scintillators (MBTS) delivered the primary trigger for selecting events from low luminosity proton-proton, lead-lead and lead-proton collisions with the smallest possible bias during LHC Run 1 (2009-2013). Similarly, the MBTS will select events for the first Run 2 physics measurements, for instance charge multiplicity, proton-proton cross section, rapidity gap measurements, etc. at the unprecedented 13 TeV center of mass energy of proton-proton collisions. We will review the upgrades to the MBTS detector that have been implemented during the 2013-2014 shutdown. New scintillators have been installed to replace the radiation damaged ones, a modified optical readout scheme have been adopted to increase the light yield and an improved data acquisition chain has been used to cope with the few issues observed during Run 1 operations. Since late 2014, MBTS have been commissioned during cosmic data taking, first LHC beam splashes and single beam LHC fills. The goal is to have a fully commissi...

  6. The NOνA experiment, the first 12 months of commissioning, operations and physics data

    Energy Technology Data Exchange (ETDEWEB)

    Norman, A. [Fermi National Accelerator Lab, Bativia, IL 60510 (France)

    2015-07-15

    The NOνA experiment is a long baseline neutrino experiment designed to make precision measurements of the oscillation probabilities for ν{sub µ} → ν{sub e} and ν{sub µ} → ν{sub µ} for both neutrinos and anti-neutrinos. These measurements will provide new information on the neutrino mass hierarchy, improve our knowledge of whether θ{sub 23} is non-maximal and possibility provide information on the CP violating phase δ{sub CP} of the PMNS neutrino mixing matrix. We present the observations of the first neutrino event in the NOνA far and near detectors along with data obtained during the first year of detector commissioning and operations. We use the data to demonstrate the detector’s ability to identify electron and muon neutrino events and to reject cosmic ray induced backgrounds at a level of 4 × 10{sup 7}:1. New estimates for the signal and background sensitivities of the NOνA experiment during the first year of full detector running are presented.

  7. The ATLAS trigger high-level trigger commissioning and operation during early data taking

    CERN Document Server

    Goncalo, R

    2008-01-01

    The ATLAS experiment is one of the two general-purpose experiments due to start operation soon at the Large Hadron Collider (LHC). The LHC will collide protons at a centre of mass energy of 14~TeV, with a bunch-crossing rate of 40~MHz. The ATLAS three-level trigger will reduce this input rate to match the foreseen offline storage capability of 100-200~Hz. After the Level 1 trigger, which is implemented in custom hardware, the High-Level Trigger (HLT) further reduces the rate from up to 100~kHz to the offline storage rate while retaining the most interesting physics. The HLT is implemented in software running in commercially available computer farms and consists of Level 2 and Event Filter. To reduce the network data traffic and the processing time to manageable levels, the HLT uses seeded, step-wise reconstruction, aiming at the earliest possible rejection. Data produced during LHC commissioning will be vital for calibrating and aligning sub-detectors, as well as for testing the ATLAS trigger and setting up t...

  8. Commissioning and first operation of the pCVD diamond ATLAS Beam Conditions Monitor

    CERN Document Server

    Dobos, D

    2009-01-01

    The main aim of the ATLAS Beam Conditions Monitor is to protect the ATLAS Inner Detector silicon trackers from high radiation doses caused by LHC beam incidents, e.g. magnet failures. The BCM uses in total 16 1x1 cm2 500 μm thick polycrystalline chemical vapor deposition (pCVD) diamond sensors. They are arranged in 8 positions around the ATLAS LHC interaction point. Time difference measurements with sub nanosecond resolution are performed to distinguish between particles from a collision and spray particles from a beam incident. An abundance of the latter leads the BCM to provoke an abort of the LHC beam. A FPGA based readout system with a sampling rate of 2.56 GHz performs the online data analysis and interfaces the results to ATLAS and the beam abort system. The BCM diamond sensors, the detector modules and their readout system are described. Results of the operation with the first LHC beams are reported and results of commissioning and timing measurements (e.g. with cosmic muons) in preparation for first ...

  9. Design, construction and commissioning of an interim spent fuel store for the decommissioning of Ignalina NPP, Lithuania

    International Nuclear Information System (INIS)

    Rainer Goehring; Martin Beverungen; Phil Smith

    2006-01-01

    The contract for the design, construction and commissioning (turn-key) of an interim spent fuel store facility (ISFSF) has been awarded to a Consortium of GNS Gesellschaft fuer Nuklear Service and RWE NUKEM GmbH under the lead of RWE NUKEM. The contract was signed on the 12.01.2005. The Interim Spent Fuel Storage Facility (ISFSF) is financed by the Ignalina Decommissioning Support Fund which is managed by EBRD. All spent fuel assemblies, currently stored in the spent fuel pits at the reactors plus future arising (about 18000 in total) will be loaded in the CONSTOR R RBMK1500/M2 containers, which are stored in the new facility. The initial contract has been awarded for 3500 spent fuel assemblies. (authors)

  10. Safety Evaluation Report related to the construction permit and operating license for the research reactor at the University of Texas (Docket No. 50-602)

    International Nuclear Information System (INIS)

    1985-05-01

    This Safety Evaluation Report for the application filed by the University of Texas for a construction permit and operating license to construct and operate a TRIGA research reactor has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is owned and operated by the University of Texas and is located at the university's Balcones Research Center, about 7 miles (11.6 km) north of the main campus in Austin, Texas. The staff concludes that the TRIGA reactor facility can be constructed and operated by the University of Texas without endangering the health and safety of the public

  11. Design improvements, construction and operating experience with BWRs in Japan

    International Nuclear Information System (INIS)

    Uchigasaki, G.; Yokomi, M.; Sasaki, M.; Aoki, R.; Hashimoto, H.

    1983-01-01

    (1) The first domestic-made 1100-MW(e) BWR in Japan commenced commercial operation in April 1982. The unit is the leading one of the subsequent three in Fukushima Daini nuclear power station owned by the Tokyo Electric Power Company Inc. (Tepco). Based on the accumulated construction and operation experience of 500-MW(e) and 800-MW(e) class BWRs, improvements in various aspects during both the design and construction stages were introduced in core and fuel design with advanced gadolinia distribution, reactor feedwater treatment technology for crud reduction, a radwaste island, control and instrumentation to cope with the lessons learned through Three Mile Island assessment etc. (2) Based on many operating experiences with BWRs, an improved BWR core, which has easier operability and higher load factor than the conventional core, has been developed. The characteristic of the improved core is ''axially two-zoned uranium enrichment distribution''; the enrichment of the upper part of the fuel is slightly higher than that of the lower part. Through the improved core it became possible to optimize the axial power flattening and core reactivity control separately by axial enrichment distribution and burnable poison content. The improved fuels were loaded into operating BWRs and successfully proved the performance by this experience. (3) To shorten annual outage time, to reduce radiation exposure, to save manpower, and to achieve high reliability and safety of inspection operation, the remote automatic service and inspection equipment were developed in Japan. This paper presents the concept, distinctive features, and actual operation experience of the automatic refuelling machine, control-rod drive (CRD) remote-handling machine, improved main steam line isolation plug, and the automated ultrasonic inspection system with a computerized data processing unit, which have been developed by Hitachi, Ltd. with excellent results. (author)

  12. Constructive Representation Theory for the Feynman Operator Calculus

    CERN Document Server

    Gill, T L

    2006-01-01

    In this paper, we survey recent progress on the constructive theory of the Feynman operator calculus. We first develop an operator version of the Henstock-Kurzweil integral, and a new Hilbert space that allows us to construct the elementary path integral in the manner originally envisioned by Feynman. After developing our time-ordered operator theory we extend a few of the important theorems of semigroup theory, including the Hille-Yosida theorem. As an application, we unify and extend the theory of time-dependent parabolic and hyperbolic evolution equations. We then develop a general perturbation theory and use it to prove that all theories generated by semigroups are asympotic in the operator-valued sense of Poincar e. This allows us to provide a general theory for the interaction representation of relativistic quantum theory. We then show that our theory can be reformulated as a physically motivated sum over paths, and use this version to extend the Feynman path integral to include more general interaction...

  13. Scenario development during commissioning operations on the National Spherical Torus Experiment Upgrade

    Science.gov (United States)

    Battaglia, D. J.; Boyer, M. D.; Gerhardt, S.; Mueller, D.; Myers, C. E.; Guttenfelder, W.; Menard, J. E.; Sabbagh, S. A.; Scotti, F.; Bedoya, F.; Bell, R. E.; Berkery, J. W.; Diallo, A.; Ferraro, N.; Kaye, S. M.; Jaworski, M. A.; LeBlanc, B. P.; Ono, M.; Park, J.-K.; Podesta, M.; Raman, R.; Soukhanovskii, V.; NSTX-U Research, the; Operations; Engineering Team

    2018-04-01

    The National Spherical Torus Experiment Upgrade (NSTX-U) will advance the physics basis required for achieving steady-state, high-beta, and high-confinement conditions in a tokamak by accessing high toroidal fields (1 T) and plasma currents (1.0-2.0 MA) in a low aspect ratio geometry (A  =  1.6-1.8) with flexible auxiliary heating systems (12 MW NBI, 6 MW HHFW). This paper describes the progress in the development of L- and H-mode discharge scenarios and the commissioning of operational tools in the first ten weeks of operation that enable the scientific mission of NSTX-U. Vacuum field calculations completed prior to operations supported the rapid development and optimization of inductive breakdown at different values of ohmic solenoid current. The toroidal magnetic field (B T0  =  0.65 T) exceeded the maximum values achieved on NSTX and novel long-pulse L-mode discharges with regular sawtooth activity exceeded the longest pulses produced on NSTX (t pulse  >  1.8 s). The increased flux of the central solenoid facilitated the development of stationary L-mode discharges over a range of density and plasma current (I p). H-mode discharges achieved similar levels of stored energy, confinement (H98y,2  >  1) and stability (β N/β N-nowall  >  1) compared to NSTX discharges for I p  ⩽  1 MA. High-performance H-mode scenarios require an L-H transition early in the I p ramp-up phase in order to obtain low internal inductance (l i) throughout the discharge, which is conducive to maintaining vertical stability at high elongation (κ  >  2.2) and achieving long periods of MHD quiescent operations. The rapid progress in developing L- and H-mode scenarios in support of the scientific program was enabled by advances in real-time plasma control, efficient error field identification and correction, effective conditioning of the graphite wall and excellent diagnostic availability.

  14. 30 CFR 285.620 - What is a Construction and Operations Plan (COP)?

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 2 2010-07-01 2010-07-01 false What is a Construction and Operations Plan (COP... Information Requirements Construction and Operations Plan for Commercial Leases § 285.620 What is a Construction and Operations Plan (COP)? The COP describes your construction, operations, and conceptual...

  15. European Commission and IAEA Celebrate 30 Years Co-operation on Nuclear Safeguards

    International Nuclear Information System (INIS)

    2011-01-01

    reprocessing plant in Japan and is now being installed in other facilities in Europe - Secure Sealing: During the last 30 years, the Seal and Identification Laboratory (SILab) of the JRC developed and produced ultrasonic bolt seals requested by the IAEA in order to seal underwater nuclear spent fuel assemblies. In 2011, after a training session at JRC in Ispra, Italy, a joint team of inspectors from the IAEA and EURATOM Safeguards and the European Commission's Directorate-General for Energy successfully sealed the first nuclear fuel bundles produced by the Cernavoda II reactor in Romania. Joint Research Centre (JRC): The JRC is the European Commission's in-house science service. Its mission is to provide customer-driven scientific and technical support for the conception, development, implementation and monitoring of European Union policies. The JRC serves the common interest of the Member States, while being independent of special interests, whether private or national. International Atomic Energy Agency (IAEA): The IAEA serves as the world's foremost intergovernmental forum for scientific and technical co-operation in the peaceful use of nuclear technology. Established as an autonomous organization under the United Nations (UN) in 1957, the IAEA carries out programmes to maximize the useful contribution of nuclear technology to society while verifying its peaceful use. (IAEA)

  16. Design and Construction of Operation Bridge for Research Reactor

    International Nuclear Information System (INIS)

    Jung, Kwangsub; Choi, Jinbok; Lee, Jongmin; Oh, Jinho

    2015-01-01

    The operation bridge contains a lower working deck mounted on a saddle that travels on rails. Upright members are mounted on the saddle to support the upper structure and two hoist monorails. The saddle contains an anti-derail system that is composed of seismic lugs and guide rollers. The operation bridge travels along the rails to transport the fuel assembly, irradiated object, and reactor components in the pools by using tools. Hoists are installed at the top girder. The hoist is suspended from the monorail by means of a motor driven trolley that runs along the monorail. Movements of hoist and trolley are controlled by using the control pendant switch. Processes of design and construction of the operation bridge for the research reactor are introduced. The operation bridge is designed under consideration of functions of handling equipment in the pool and operational limits for safety. Structural analysis is carried out to evaluate the structural integrity in the seismic events. Tests and inspections are also performed during fabrication and installation to confirm the function and safety of the operation bridge

  17. Mechanic- and hydraulic shock-absorbers - layout, construction, operation experience

    International Nuclear Information System (INIS)

    Kluge, M.

    1981-01-01

    The problem lies in the protection of the flexible supported power plant components against undesired sudden movements. Various shock absorbing systems are at disposal in this case: Mechanical and hydraulic shock absorbers, whose functioning systems are shown in figures. The operation experience showed a series of deficiencies, as demonstrated on various figures. In order to avoid them, some important recommendations are given. Requirements and layout are demonstrated according to todays' state-of-the-art. The admissible stresses, resulting from the summary of various specifications for the analytical evidence will be described. Development and construction will be explained in detail by means of pictures with cross sections of original shock absorbers. Todays' construction characteristics will be summarized. The final remark includes a request for generally valid guidelines. (orig.) [de

  18. Regulatory aspects of construction and operation in Switzerland

    International Nuclear Information System (INIS)

    Hugi, Markus

    2014-01-01

    The regulatory mission with respect to radioactive waste disposal in Switzerland consists of the following tasks: to assess proposed solutions and supervise the preparation for geological disposal of radioactive waste, to review the licence applications in accord with the stepwise implementation process; to supervise the transport of radioactive material to and from nuclear installations; to supervise surface facilities and underground installations of deep geological repositories; and to supervise the safety of staff and the public and their protection from radiation. Related nuclear legislation consists of the Nuclear Energy Act, the Radiological Protection Act including the corresponding Ordinances, and the Ordinance on the Decommissioning Fund and the Waste Disposal Fund for Nuclear Installations. Design, construction and operating principles for DGRs and requirements for the safety case have been developed recently by the Swiss regulatory body. The corresponding guideline specifies protection objectives, protection criteria and specific requirements for DGRs, defines the procedure to be followed for demonstrating the safety of a geological repository, and identifies requirements for the operation of facilities and for their closure. The Nuclear Energy Act stipulates a series of licences that must be obtained prior to completion of a DGR - starting with a general licence, followed by the licences for construction and operation, and finally the closure order

  19. LHC beam dump system : analysis of beam commissioning, performance and the consequences of abnormal operation

    International Nuclear Information System (INIS)

    Kramer, T.

    2011-01-01

    , misalignments, mechanical apertures and tolerances) as well as different collimator settings for the TCDQ protection system in lR6 can be done in parallel, considering time dependent kicks as applied for the fast MKD and MKB magnets with a 5 ns resolution. The developed architecture allows simulating on the basis of realistic machine settings and allowed to verify in a first step some safety relevant LBDS design parameters already before the actual beam commissioning started. The results obtained show that the LBDS is very well designed, with sufficient margin to accept the failure cases which are expected to happen during its operation. Eventual partial beam losses during abnormal operation parameters are discussed. The future precise validation of simulation results will allow to use such techniques to evaluate safety and operation parameter settings for higher energy levels. This is particularly interesting as machine development and measurement at top energy is time consuming due to long beam generation cycles as well as it is a concern of machine safety. Hence simulations can give useful starting points to minimize the measurement effort. (author) [de

  20. Vertex operator construction of superconformal ghosts and string field theory

    International Nuclear Information System (INIS)

    Ezawa, Z.F.; Nakamura, S.; Tezuka, A.

    1987-01-01

    Superconformal ghosts in string theories are characterized by the SU(1,1) Kac-Moody algebra with central charge -1/2. These ghost fields are constructed as the vertex operators realizing spinor representations of the Kac-Moody algebra. Representations of the canonical commutation relations of the superconformal ghosts are analyzed extensively. All irreducible representations are found to possess only the trivial inner product but for one exceptional case. Consequently, in superstring field theory it is necessary to consider reducible representations in general. Hilbert spaces with a non-trivial inner product are explicitly obtained upon which second quantization of superstring may be carried out. (orig.)

  1. Pre-commissioning, commissioning, start-up and operation of a major extension to an LNG manufacturing facility in Bintulu, Sarawak

    International Nuclear Information System (INIS)

    Wong, T.

    1997-01-01

    In 1989, a decision was taken by the Shareholders of Malaysia LNG Sdn Bhd (MLNG) to expand their existing LNG manufacturing facility of some 8.0 million tonnes per annum, and to minimise the capital investment by maximizing the use of available off-plot facilities and utilities, together with the introduction of proven technological enhancements. Accordingly a new Company (MLNG Dua) was set up to own and manage this project and joint venture between existing shareholders. This paper describes the organisation, planning, and execution of the precommissioning, commissioning, start-up, and operation of the off-plot facilities, integrated utilities, and the first new process module, such that on-grade LNG rundown into MLNG's existing storage capacity was achieved within 26 days of the process module being signed off as Ready for Start-up (RFSU). (au)

  2. Planning, Investment, Construction and Operation of Rail Transit in Beijing

    Institute of Scientific and Technical Information of China (English)

    2012-01-01

    In Beijing, the rail transit firstly came into existence in the mid 1960s and was officially put into operation for civil use in the early 1980s. It has entered a period of rapid development since 2001, with thanks to the coming of the Olympic Games in 2008, and has been playing a more and more important role in the passenger transport of Beijing since then on, as a key part of the public transportation. Based on a resume on the evolution of rail transit development in Beijing, this paper analyzes the mechanism of policy-making, the mode of investment and financing, the procedure of construction, and the management of operation of rail transit, all of which ensure its rapid development and effective performance.

  3. Submicron particle monitoring of paving and related road construction operations.

    Science.gov (United States)

    Freund, Alice; Zuckerman, Norman; Baum, Lisa; Milek, Debra

    2012-01-01

    This study identified activities and sources that contribute to ultrafine and other submicron particle exposure that could trigger respiratory symptoms in highway repair workers. Submicron particle monitoring was conducted for paving, milling, and pothole repair operations in a major metropolitan area where several highway repair workers were identified as symptomatic for respiratory illness following exposures at the 2001 World Trade Center disaster site. Exposure assessments were conducted for eight trades involved in road construction using a TSI P-Trak portable condensation particle counter. Direct readings near the workers' breathing zones and observations of activities and potential sources were logged on 7 days on 27 workers using four different models of pavers and two types of millers. Average worker exposure levels ranged from 2 to 3 times background during paving and from 1 to 4 times background during milling. During asphalt paving, average personal exposures to submicron particulates were 25,000-60,000, 28,000-70,000, and 23,000-37,000 particles/ cm(3) for paver operators, screed operators, and rakers, respectively. Average personal exposures during milling were 19,000-111,000, 28,000-81,000, and 19,000 particles/cm(3) for the large miller operators, miller screed operators, and raker, respectively. Personal peak exposures were measured up to 467,000 and 455,000 particles/cm(3) in paving and milling, respectively. Several sources of submicron particles were identified. These included the diesel and electric fired screed heaters; engine exhaust from diesel powered construction vehicles passing by or idling; raking, dumping, and paving of asphalt; exhaust from the hotbox heater; pavement dust or fumes from milling operations, especially when the large miller started and stopped; and secondhand cigarette smoke. To reduce the potential for health effects in workers, over 40 recommendations were made to control exposures, including improved maintenance of

  4. Commissioning and First Operation of the Low-Beta Triplets and Their Electrical Feed Boxes at the Large Hadron Collider

    CERN Document Server

    Darve, C; Casas-Cubillos, J; Claudet, S; Feher, S; Ferlin, G; Kerby, J; Metral, L; Perin, A; Peterson, T; Prin, H; Rabehl, R; Vauthier, N; Wagner, U; van Weelderen, R

    2010-01-01

    The insertion regions located around the four interaction points of the Large Hadron Collider (LHC) are mainly composed of the low-b triplets, the separation dipoles and their respective electrical feed-boxes (DFBX). The low-b triplets are Nb-Ti superconductor quadrupole magnets, which operate at 215 T/m in superfluid helium at a temperature of 1.9 K. The commissioning and the first operation of these components have been performed. The thermo-mechanical behavior of the low-b triplets and DFBX were studied. Cooling and control systems were tuned to optimize the cryogenic operation of the insertion regions. Hardware commissioning also permitted to test the system response. This paper summarizes the performance results and the lessons learned.

  5. BROOKHAVEN: Booster commissioned

    Energy Technology Data Exchange (ETDEWEB)

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  6. Report on the establishment and operation of the Federal Energy Regulatory Commission's Daycare Center

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-16

    We have completed an inspection of the Federal Energy Regulatory Commission's (FERC) Daycare Center (Center). The purpose of the inspection was to review for efficiency, economy and compliance with laws and regulations, FERC's establishment and operation of the Center. The inspection objectives were to review: (1) FERC's compliance with Federal laws and requirements of the General Services Administration and the District of Columbia; (2) the source and amount of funds for establishing and operating the Center; and (3) the organizational relationships between FERC, the Center and the contractor operating the Center.

  7. 47 CFR 0.5 - General description of Commission organization and operations.

    Science.gov (United States)

    2010-10-01

    ...) Office of Workplace Diversity (11) Wireline Competition Bureau. (12) Wireless Telecommunications Bureau... information concerning the Commission.) (c) Delegations of authority to the staff. Pursuant to section 5(c) of..., on its own motion or on an application for review filed by a person aggrieved by the action. Except...

  8. Construction and operation of the Howard T. Ricketts Laboratory.

    Energy Technology Data Exchange (ETDEWEB)

    Van Lonkhuyzen, R.; Stull, L.; Butler, J.; Chang, Y.; Allison, T.; O' Rourke, D.

    2006-01-01

    The National Institutes of Health (NIH) has proposed to partially fund the construction of the Howard T. Ricketts (HTR) regional biocontainment laboratory (RBL) by the University of Chicago at the U.S. Department of Energy's (DOE's) Argonne National Laboratory in Argonne, Illinois. The HTR Laboratory (HTRL) would be constructed, owned, and operated by the University of Chicago on land leased to it by DOE. The preferred project site is located north of Eastwood Drive and west of Outer Circle Road and is near the biological sciences building. This environmental assessment addresses the potential environmental effects resulting from construction and operation of the proposed facility. The proposed project involves the construction of a research facility with a footprint up to approximately 44,000 ft{sup 2} (4,088 m{sup 2}). The proposed building would house research laboratories, including Biosafety Level 2 and 3 biocontainment space, animal research facilities, administrative offices, and building support areas. The NIH has identified a need for new facilities to support research on potential bioterrorism agents and emerging and re-emerging infectious diseases, to protect the nation from such threats to public health. This research requires specialized laboratory facilities that are designed, managed, and operated to protect laboratory workers and the surrounding community from accidental exposure to agents. The proposed HTRL would provide needed biocontainment space to researchers and promote the advancement of knowledge in the disciplines of biodefense and emerging and re-emerging infectious diseases. Several alternatives were considered for the location of the proposed facility, as well as a no action alternative. The preferred alternative includes the construction of a research facility, up to 44,000 ft{sup 2} (4,088 m{sup 2}), at Argonne National Laboratory, a secure government location. Potential impacts to natural and cultural resources have been

  9. The ALICE Transition Radiation Detector: Construction, operation, and performance

    Science.gov (United States)

    Alice Collaboration

    2018-02-01

    The Transition Radiation Detector (TRD) was designed and built to enhance the capabilities of the ALICE detector at the Large Hadron Collider (LHC). While aimed at providing electron identification and triggering, the TRD also contributes significantly to the track reconstruction and calibration in the central barrel of ALICE. In this paper the design, construction, operation, and performance of this detector are discussed. A pion rejection factor of up to 410 is achieved at a momentum of 1 GeV/ c in p-Pb collisions and the resolution at high transverse momentum improves by about 40% when including the TRD information in track reconstruction. The triggering capability is demonstrated both for jet, light nuclei, and electron selection.

  10. Nuclear Regulatory Commission Issuances

    International Nuclear Information System (INIS)

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  11. Final environmental statement related to the operation of St. Lucie Plant, Unit No. 2. Docket No. 50-389, Florida Power and Light Company, Orlando Utilities Commission of the City of Orlando, Florida

    International Nuclear Information System (INIS)

    1982-04-01

    This final environmental statement was prepared by the US Nuclear Regulatory Commission (NRC), Office of Nuclear Reactor Regulation (the staff) in accordance with the Commission's Regulations, set forth in 10 CFR Part 51, which implement the requirements of the National Environmental Policy Act of 1969 (NEPA). Sections related to the aquatic environment were prepared in cooperation with the US Environmental Protection Agency, Region IV. This statement reviews the impact of operation of the St. Lucie Plant, Unit 2. Assessments that are found in this statement supplement those described in the Final Environmental Statement (FES-CP) that was issued in May 1974 in support of issuance of a construction permit for the unit

  12. Enhancement of organizational and technical solutions regarding anchoring of completed construction facilities of underground railway system to operating control

    Directory of Open Access Journals (Sweden)

    Е. Г. Козин

    2017-12-01

    Full Text Available Stages of practical realization of measures prescribed by requirements documents regarding anchoring of capital structures of underground railway system to operating control are considered in the article. On the basis of algorithm structure analysis, which includes obtaining a permit for putting into operation and cadastre works execution a range of solutions was proposed concerning optimization of construction project owner and operating organization activities with the purpose of terms reduction of capital structures handover to operation. The results of work of a commission responsible for completed underground railway system objects acceptance and putting into operation were analyzed. Considering example of object «Second entrance hall area of «Sportivnaya» station the statistical data of revealed snagging items is consolidated and dynamics of corrective actions is provided.Proposed solutions laid the foundation for corrections of requirements documents and were accepted for realization in the process of works acceptance of Saint-Petersburg underground railway system objects.

  13. Commissioning and operational results of helium refrigeration system at JLab for the 12GeV upgrade

    Energy Technology Data Exchange (ETDEWEB)

    Knudsen, Peter N. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Ganni, Venkatarao [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Dixon, Kelly D. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Norton, Robert O. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States); Creel, Jonathan D. [Thomas Jefferson National Accelerator Facility (TJNAF), Newport News, VA (United States)

    2015-12-01

    The new 4.5 K refrigerator system at the Jefferson Lab (JLab) Central Helium Liquefier (CHL-2) for the 12 GeV upgrade was commissioned in late spring of 2013, following the commissioning of the new compressor system, and has been supporting 12 GeV LINAC commissioning since that time. Six design modes were tested during commissioning, consisting of a maximum capacity, nominal capacity, maximum liquefaction, maximum refrigeration, maximum fill and a stand-by/reduced load condition. The maximum capacity was designed to support a 238 g/s, 30 K and 1.16 bar cold compressor return flow, a 15 g/s, 4.5 K liquefaction load and a 12.6 kW, 35-55 K shield load. The other modes were selected to ensure proper component sizing and selection to allow the cold box to operate over a wide range of conditions and capacities. The cold box system is comprised of two physically independent cold boxes with interconnecting transfer-lines. The outside (upper) 300-60 K vertical cold box has no turbines and incorporates a liquid nitrogen pre-cooler and 80-K beds. The inside (lower) 60-4.5 K horizontal cold box houses seven turbines that are configured in four expansion stages including one Joule-Thompson expander and a 20-K bed. The helium compression system has five compressors to support three pressure levels in the cold box. This paper will summarize the analysis of the test data obtained over the wide range of operating conditions and capacities which were tested.

  14. Point Lepreau G.S. commissioning management experience

    International Nuclear Information System (INIS)

    Alikhan, S.; Walker, W.J.

    1983-05-01

    This paper shares the experience gained by New Brunswick Power in commissioning its first nuclear plant, with particular emphasis on the management techniques that were developed. Some of the areas discussed include: organization of Nuclear Operations Group responsible for commissioning and its interface with construction; outline and scope of documentation required to define, execute and report commissioning to satisfy the licensing requirements, management techniques developed to implement commissioning; and a summary of lessons learned and recommendations for the future

  15. Commissioning and Operational Experience With an Intermediate Upgrade Cryomodule for the CEBAF 12 GeV Upgrade

    International Nuclear Information System (INIS)

    Thomas Powers; Davis, G.; Michael Drury; Christiana Grenoble; Hovater, J.; Lawrence King; Tomasz Plawski; Joseph Preble

    2005-01-01

    Three cryomodules have been designed and built as intermediate prototypes for the CEBAF 12 GeV upgrade. This paper will discuss the commissioning and operational experience with the second of these cryomodules, which was installed and commissioned in the Jefferson Lab 10 kW Free Electron Laser Facility. Within the cryomodule are eight 7-cell, 1497 MHz cavities. It was designed to accelerate 1 mA of beam in excess of 70 MV and to have the same footprint as a standard CEBAF cryomodule. The cryomodule was installed in parallel with the FEL beam line in the spring of 2004 and characterized simultaneous with beam delivery. It was installed in the beam line in the early summer of 2004 and has since been operated as part of an energy recovered linac with 5 mA of beam current and 75 MV accelerating gradient for extended periods of time. Additionally, it was operated at 1 mA of beam current and 80 MV of accelerating gradient for several hours without a trip. In the latter operating mode the beam current was limited by the injector setup

  16. Construction site Voice Operated Information System (VOIS) test

    Science.gov (United States)

    Lawrence, Debbie J.; Hettchen, William

    1991-01-01

    The Voice Activated Information System (VAIS), developed by USACERL, allows inspectors to verbally log on-site inspection reports on a hand held tape recorder. The tape is later processed by the VAIS, which enters the information into the system's database and produces a written report. The Voice Operated Information System (VOIS), developed by USACERL and Automated Sciences Group, through a ESACERL cooperative research and development agreement (CRDA), is an improved voice recognition system based on the concepts and function of the VAIS. To determine the applicability of the VOIS to Corps of Engineers construction projects, Technology Transfer Test Bad (T3B) funds were provided to the Corps of Engineers National Security Agency (NSA) Area Office (Fort Meade) to procure and implement the VOIS, and to train personnel in its use. This report summarizes the NSA application of the VOIS to quality assurance inspection of radio frequency shielding and to progress payment logs, and concludes that the VOIS is an easily implemented system that can offer improvements when applied to repetitive inspection procedures. Use of VOIS can save time during inspection, improve documentation storage, and provide flexible retrieval of stored information.

  17. Construction and operation of a drift-collection calorimeter

    International Nuclear Information System (INIS)

    Ambats, I.; Ayres, D.S.; Dawson, J.W.

    1984-01-01

    Large areas planar drift chambers with long drift distance (up to 50 cm) have been developed for possible use in the new Soudan 2 nucleon decay detector. Design goals included fine sampling to determine the topology of complex events with several low-energy tracks. The large scale of the experiment (> 1000 metric tons) required large area inexpensive chambers, which also had good position resolution and multi-track separation. The chambers were to be installed between thin sheets of steel to form a finegrained detector. A second goal was the sampling of dE/dx with each position measurement, in order to determine the direction and particle identity of each track. In this paper we report on the construction and operation of a prototype dectector consisting of 50 chambers, separated by 3 mm-thick steel plates. Readout of drift time and pulse height from anode wires and an orthogonal grid of bussed cathode pads utilized 6-bit flash ADC's. This application of the drift-collection calorimeter technique to a nucleon decay detector follows the investigation by a number of groups of calorimeters for high energy detectors based on long drifting

  18. Commissioning and First Operation of the Cryogenics for the CERN Axion Solar Telescope (CAST)

    CERN Document Server

    Barth, K; Passardi, Giorgio; Pezzetti, M; Pirotte, O; Stewart, L; Vullierme, B; Walckiers, L; Zioutas, Konstantin

    2004-01-01

    A new experiment, the CERN Axion Solar Telescope (CAST) was installed and commissioned in 2002. Its aim is to experimentally prove the existence of an as yet hypothetical particle predicted by theory as a solution of the strong CP problem and possible candidate for galactic dark matter. The heart of the detector consists of a decommissioned 10-m long LHC superconducting dipole prototype magnet, providing a magnetic field of up to 9.5 T. The whole telescope assembly is aligned with high precision to the core of the sun. If they exist, axions could be copiously produced in the core of the sun and converted into photons within the transverse magnetic field of the telescope. The converted low-energy solar axion spectrum, peaked around a mean energy of 4.4 keV, can then be focused by a special x-ray mirror system and detected by low-background photon detectors, installed on each end of the telescopes twin beam pipes. This paper describes the external and proximity cryogenic system and magnet commissioning as well ...

  19. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3070)

    Energy Technology Data Exchange (ETDEWEB)

    Zeitoun, A. [Science Applications International Corp., Germantown, MD (United States)

    1994-08-01

    This two-volume Final Environmental Impact Statement (FEIS) was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA). Volume 1 contains the assessment of the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana, by Louisiana Energy Services, LP. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are construction, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning (D&D)- of the site. Issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment. The FEIS supports issuance of a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility.

  20. The Time-Of-Flight detector of ALICE at LHC: construction, test and commissioning with cosmic rays

    CERN Document Server

    Preghenella, Roberto

    2009-01-01

    After several years of research and development the Time-Of-Flight detector of ALICE (A Large Ion Collider Experiment) has been constructed and is presently fully installed and operative in the experimental area located at the interaction point n.2 of the LHC (Large Hadron Collider) at CERN. Particle identification in ALICE is essential, as many observables are either mass or flavour dependent, therefore many different techniques are used to cover the largest possible momentum range. As said, the TOF (Time- Of-Flight) detector, of which a comprehensive review is given in Chapter 2, is dedicated to hadron identification at medium momenta. The detector exploits the novel technology based on the Multigap Resistive Plate Chamber (MRPC) which guarantees the excellent performance required for a very large time-of-flight array. The construction of the ALICE TOF detector has required the assembly of a large number of MRPC detectors which has been successfully carried out thanks to a careful mass production controlled...

  1. Report to the US Nuclear Regulatory Commission on analysis and evaluation of operational data - 1987: Power reactors

    Energy Technology Data Exchange (ETDEWEB)

    None

    1988-10-01

    This annual report of the US Nuclear Regulatory Commission's Office for Analysis and Evaluation of Operational Data (AEOD) is devoted to the activities performed during 1987. The report is published in two volumes. NUREG-1272, Vol. 2, No. 1, covers Power Reactors and presents an overview of the operating experience of the nuclear power industry, with comments regarding the trends of some key performance measures. The report also includes the principal findings and issues identified in AEOD studies over the past year, and summarizes information from Licensee Event Reports, the NRC's Operations Center, and Diagnostic Evaluations. NUREG-1272, Vol. 2, No. 2, covers Nonreactors and presents a review of the nonreactors events and misadministration reports that were reported in 1987 and a brief synopsis of AEOD studies published in 1987. Each volume contains a list of the AEOD Reports issued for 1980-1987.

  2. The LHC machine: from beam commissioning to operation and future upgrades

    CERN Document Server

    Giovannozzi, Massimo

    2015-01-01

    This chapter describes the current status of the LHC. General machine parameters are reviewed and the beam commissioning process is presented, showing the evolution of the machine’s performance over recent years. The highlights of the powerful complex of injectors are described, in order to provide a global picture of the impressive performance of CERN’s flagship machine, which relies on both the astonishing quality of the LHC itself and the incredible flexibility of the injectors. The focus is on proton physics performance, with emphasis on the different possible scenarios leading to an upgrade of the LHC performance. Finally, the prospects for the development of the machine into the far future are briefly discussed.

  3. A Systems Engineering Framework for Design, Construction and Operation of the Next Generation Nuclear Plant

    International Nuclear Information System (INIS)

    Edward J. Gorski; Charles V. Park; Finis H. Southworth

    2004-01-01

    Not since the International Space Station has a project of such wide participation been proposed for the United States. Ten countries, the European Union, universities, Department of Energy (DOE) laboratories, and industry will participate in the research and development, design, construction and/or operation of the fourth generation of nuclear power plants with a demonstration reactor to be built at a DOE site and operational by the middle of the next decade. This reactor will be like no other. The Next Generation Nuclear Plant (NGNP) will be passively safe, economical, highly efficient, modular, proliferation resistant, and sustainable. In addition to electrical generation, the NGNP will demonstrate efficient and cost effective generation of hydrogen to support the President's Hydrogen Initiative. To effectively manage this multi-organizational and technologically complex project, systems engineering techniques and processes will be used extensively to ensure delivery of the final product. The technological and organizational challenges are complex. Research and development activities are required, material standards require development, hydrogen production, storage and infrastructure requirements are not well developed, and the Nuclear Regulatory Commission may further define risk-informed/performance-based approach to licensing. Detailed design and development will be challenged by the vast cultural and institutional differences across the participants. Systems engineering processes must bring the technological and organizational complexity together to ensure successful product delivery. This paper will define the framework for application of systems engineering to this $1.5B - $1.9B project

  4. Startup and commissioning of pressurized water reactors

    International Nuclear Information System (INIS)

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  5. Chemistry control approach of pre commissioning and power operation of primary and auxiliary system of KGS-3 and 4 and trouble shooting made

    International Nuclear Information System (INIS)

    Bennet Raj, N.; Sahu, B.S.; Kumar, Vineet; Valluri, J.

    2008-01-01

    KGS (Kaiga Generating Station) 3 and 4 is a 220 MWe pressurized heavy water reactor (PHWR) using heavy water (D 2 O) as moderator and primary heat coolant and the secondary system is light water which is used to make the steam for generating the power. The chemistry control approach made for the successful commissioning and subsequent power operation of the unit is discussed here. The chemistry control is of two parts first part covers the pre commissioning chemistry control and the second part covers the commissioning chemistry control. During commissioning all systems were preserved by proper chemistry control and regular recirculation of system to avoid stagnancy. The major pre commissioning and commissioning chemistry control are depicted below: Pre commissioning chemistry control of primary heat transport (PHT) system and auxiliaries; Pre commissioning chemistry control of moderator system; Primary heat transport system hot conditioning with light water; Commissioning chemistry control of End Shield System (ESC) and Calandria Vault Cooling (CVC) system; Heavy water addition and its chemistry control in moderator system; and Heavy water addition and its chemistry control in PHT system. During power operation dew point in annular gas monitoring system (AGMS) of KGS unit 3 was maintaining in higher side under recirculation. The increase of dew point could be due to ingress of heavy water or light water. A new device was developed to collect condensate and the chemistry of the condensate was checked. The result indicated the ingress of light water. (author)

  6. Radio Frequency Identification in Construction Operation and Maintenance

    DEFF Research Database (Denmark)

    Sørensen, Kristian Birch; Christiansson, Per; Svidt, Kjeld

    2008-01-01

    As early as in 1995 it was stated that automatic identification of objects using RFID was a promising technology for the construction industry. However, 13 years later the applications of RFID in the construction industry are rare and mostly used in prototype projects or used for theft prevention...

  7. Round table: The New Constructions; New Build; IAEA Services Nuclear Power Reactor Technologies Construction and Operation

    International Nuclear Information System (INIS)

    Choho, Tarik; Ward, Tony; Koshy, Thomas; )

    2014-01-01

    The first round-table of Atoms for the Future 2014 focused on the topic of 'The new construction'. Attendees had the opportunity to see Tarik Choho, Chief Commercial Executive Officer at AREVA, Tony Ward, Partner and Head of Power and Utilities at EY, as well as Thomas Koshy, Head of Nuclear Power technology Development Section at the IAEA, share their respective point of view and discuss together. They first started with their own presentation before sitting together at the discussion panel. Tarik Choho explained that there are many opportunities for new builds around the world, and especially in new comer countries. Thomas Koshy brought his expert point of view as an international regulator. He showed that the technology landscape also includes new designs as well as non-electricity generation uses. Those two aspects could bring both opportunities and challenges for licensing. Tony Ward showed how difficult it was to finance such a capitalistically intensive project as a new build, and how one could try to find an electricity retail price which is acceptable for both the general private consumer and the plant operator. All speakers agreed that preparation was core to a nuclear new build project. They also pointed out that every project involves more and more actors, and that it could be challenging to let everyone have the appropriate say

  8. Commissioning and Operation of a Cryogenic Target at HI γS

    Science.gov (United States)

    Kendellen, David; Compton@HIγS Collaboration

    2017-01-01

    We have developed a cryogenic target for use at the High Intensity γ-ray Source (HI γS). The target system is able to liquefy helium-4 (LHe) at 4 K, hydrogen (LH2) at 20 K, or deuterium (LD2) at 23 K to fill a 0.3 L Kapton cell. Liquid temperatures and condenser pressures are recorded throughout each run in order to ensure that the target's areal density is known to 1%. A low-temperature valve enables cycling between full and empty modes in less than 15 minutes. The target is being utilized in a series of experiments which probe the electromagnetic polarizabilities of the nucleon by Compton scattering high-energy photons from the liquid and detecting them with the HI γS NaI Detector Array (HINDA). During a 50-hour-long commissioning run, the target held LHe at 3.17 K, followed by 600 hours of production running with LD2 at 23.9 K. The design of the target will be presented and its performance during these runs will be discussed. Work supported by US Department of Energy contracts DE-FG02-97ER41033, DE-FG02-06ER41422, and DE-SCOO0536

  9. A study on the operator's errors of commission (EOC) in accident scenarios of nuclear power plants: methodology development and application

    International Nuclear Information System (INIS)

    Kim, Jae Whan; Jung, Won Dea; Park, Jin Kyun; Kang, Da Il

    2003-04-01

    As the concern on the operator's inappropriate interventions, the so-called Errors Of Commission (EOCs), that can exacerbate the plant safety has been raised, much of interest in the identification and analysis of EOC events from the risk assessment perspective has been increased. Also, one of the items in need of improvement for the conventional PSA and HRA that consider only the system-demanding human actions is the inclusion of the operator's EOC events into the PSA model. In this study, we propose a methodology for identifying and analysing human errors of commission that might be occurring from the failures in situation assessment and decision making during accident progressions given an initiating event. In order to achieve this goal, the following research items have been performed: Firstly, we analysed the error causes or situations contributed to the occurrence of EOCs in several incidents/accidents of nuclear power plants. Secondly, limitations of the advanced HRAs in treating EOCs were reviewed, and a requirement for a new methodology for analysing EOCs was established. Thirdly, based on these accomplishments a methodology for identifying and analysing EOC events inducible from the failures in situation assessment and decision making was proposed and applied to all the accident sequences of YGN 3 and 4 NPP which resulted in the identification of about 10 EOC situations

  10. Large scale commissioning and operational experience with tier-2 to tier-2 data transfer links in CMS

    International Nuclear Information System (INIS)

    Letts, J; Magini, N

    2011-01-01

    Tier-2 to Tier-2 data transfers have been identified as a necessary extension of the CMS computing model. The Debugging Data Transfers (DDT) Task Force in CMS was charged with commissioning Tier-2 to Tier-2 PhEDEx transfer links beginning in late 2009, originally to serve the needs of physics analysis groups for the transfer of their results between the storage elements of the Tier-2 sites associated with the groups. PhEDEx is the data transfer middleware of the CMS experiment. For analysis jobs using CRAB, the CMS Remote Analysis Builder, the challenges of remote stage out of job output at the end of the analysis jobs led to the introduction of a local fallback stage out, and will eventually require the asynchronous transfer of user data over essentially all of the Tier-2 to Tier-2 network using the same PhEDEx infrastructure. In addition, direct file sharing of physics and Monte Carlo simulated data between Tier-2 sites can relieve the operational load of the Tier-1 sites in the original CMS Computing Model, and already represents an important component of CMS PhEDEx data transfer volume. The experience, challenges and methods used to debug and commission the thousands of data transfers links between CMS Tier-2 sites world-wide are explained and summarized. The resulting operational experience with Tier-2 to Tier-2 transfers is also presented.

  11. Impact of oil on the marine environment: policy of the Paris Commission on operational discharges from the offshore industry

    International Nuclear Information System (INIS)

    Nihoul, C.; Ducrotoy, J.-P.

    1994-01-01

    The input of oil to the North Sea due to the offshore industry has been estimated at 29% of the total input of oil. The operational discharges consist of production water and drilling cuttings. An overview of statistics collected over the last 10 years shows that although the amount of oil discharged via production water is increasing as platforms are getting older, cuttings still account for 75% of the oil entering the sea as a result of normal operations. Spills represent a relatively small source of oil. The effects on the marine environment of discharges of production water and of discarded oily cuttings have been extensively studied, by national authorities as well as by the industry. Although it has not always been possible to reach consensus about the significance of the observed effects, a number of 'agreed facts' have led to the establishment of regulations in the framework of the Paris Commission. The 'decisions' and 'recommendations' adopted by the Commission are regularly reviewed in the light of new developments. (author)

  12. International co-operation in safety matters within the framework of the Commission of the European Communities

    International Nuclear Information System (INIS)

    Vinck, W.; Balz, W.; Essler, W.; Tolley, B.; Gabolde, J.

    1981-01-01

    European Community (EC) countries realize that their energy demand cannot be met without a nuclear component, which is almost a necessity owing to its major economic advantages. Two typical areas where the Commission has stimulated intense international co-operation are as follows: The first broad area deals with efforts towards a gradual harmonization of regulatory health and safety practices and requirements for reactors of an industrially developed type, more specifically (light) water-cooled reactors. The second area concerns joint research programmes and co-ordination activities in research on nuclear safety (LWRs and LMFBRs). These two broad areas are closely interconnected. Information is also given on the existing network of bilateral and multilateral arrangements for the exchange of information of interest to the EC. In conclusion, some problems are highlighted where improvements could be made or where it seems crucial that increased international co-operation and especially agreement should come about. (author)

  13. Corrosion inhibition measures in primary cooling water system during refurbishment of Cirus, re-commissioning and subsequent operation

    International Nuclear Information System (INIS)

    Rai, K.K.; Ramesh, N.; Sharma, R.C.

    2008-01-01

    Cirus is a 40 MWth, heavy water moderated, demineralized light water cooled, natural uranium fuelled research reactor. Reactor was commissioned in year 1960 and operated satisfactorily till 1990. After that availability factor started decreasing mainly due to equipment outage exhibiting signs of ageing. Based upon systematic ageing studies and assessment of condition of systems, structures and components, a refurbishment plan including safety upgrades was drawn up. Reactor was shut down in October 1997 for execution of jobs. After completion of refurbishment jobs reactor was started back in October 2002 and power operation was achieved in 2003. Primary cooling water (PCW) system consists of re-circulating pumps, heat exchangers, expansion tank, piping, valves, emergency storage reservoir (Ball Tank) and other components. Normally the fission heat from fuel is removed by re-circulating coolant in closed loop and transferred to seawater via heat exchangers. In case of outage of pumps, shut down cooling is provided by flow of water from Ball Tank under gravity to the underground dump tanks. The dissolved oxygen is maintained below 2 ppm and pH is maintained neutral to minimize corrosion of fuel cladding (Aluminum). This paper highlights the experience gained during segmentation of primary cooling water pipelines for pressure testing, measures taken to corrosion inhibition of primary cooling water lines to permit execution of refurbishment jobs, inspections and actions taken to repair/replace the corroded PCW pipe line segments, observations regarding corrosion related failures, re-commissioning of the system after refurbishment, assessment for safe reactor operation and experience during power operation. (author)

  14. Evaluating delay factors in the construction and operation of port ...

    African Journals Online (AJOL)

    In Iran, between 30% and 40% of the total budget of the country `is allocated to this ... improper allocation of resources (24%), cash flows changes(28%), failure to ... Keywords: Delay Factors, Port Construction Projects, Project Management.

  15. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management

    International Nuclear Information System (INIS)

    Lesko, K.F.; Berriochoa, M.V.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, 'Management of Construction Projects, A Constructor's Perspective', University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted

  16. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    Energy Technology Data Exchange (ETDEWEB)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are

  17. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements (French Edition)

    International Nuclear Information System (INIS)

    2016-01-01

    This publication describes the requirements to be met to ensure the safe operation of nuclear power plants. It takes into account developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication.

  18. Safety of Nuclear Power Plants: Commissioning and Operation. Specific Safety Requirements

    International Nuclear Information System (INIS)

    2016-01-01

    This publication describes the requirements to be met to ensure the safe operation of nuclear power plants. It takes into account developments in areas such as long term operation of nuclear power plants, plant ageing, periodic safety review, probabilistic safety analysis and risk informed decision making processes. In addition, the requirements are governed by, and must apply, the safety objective and safety principles that are established in the IAEA Safety Standards Series No. SF-1, Fundamental Safety Principles. A review of Safety Requirements publications was commenced in 2011 following the accident in the Fukushima Daiichi nuclear power plant in Japan. The review revealed no significant areas of weakness and resulted in just a small set of amendments to strengthen the requirements and facilitate their implementation, which are contained in the present publication

  19. Assessment of operational safety data in the Nuclear Regulatory Commission (NRC)

    International Nuclear Information System (INIS)

    Michelson, C.; Heltemes, C.J.

    1981-01-01

    The collection, assessment, and dissemination of operational safety data, including the Licensee Event Reports (LERs) is the principal activity of the NRC's Office for Analysis and Evaluation of Operational Data (AEOD). This office was recently formed to provide a dedication to this activity. It has been staffed and fully operational since April 1980. The office programs are evolving and include some new ideas and techniques to aid in the assessment of LERs. For example, the office is managing the development of a computer-based Sequence Coding and Search (SCS) procedure which will have the capability to store and retrieve the detail and individual sequences associated with each LER. Such events may be rather complex and involve a number of isolated or unrelated happenings associated with multiple systems and components with various causes, failure modes, and failure effects. Thus, the SCS system is particularly useful because it documents in a computer-retrievable form not only the principal occurrence, but also related component and system responses which precede, accompany, follow, or result from the principal occurrence. Also noteworthy is the Power Reactor Watch List which is being developed and monitored as a part of the AEOD program

  20. Beam commissioning and operation of the J-PARC main ring synchrotron

    International Nuclear Information System (INIS)

    Koseki, Tadashi; Arakaki, Yoshitugu; Chin, Yong Ho; Hara, Keigo; Hasegawa, Katsushi; Hashimoto, Yoshinori; Hori, Yoichiro; Igarashi, Susumu; Ishii, Koji; Kamikubota, Norihiko; Kimura, Takuro; Koseki, Kunio; Fan, Kuanjyun; Kubota, Chikashi; Kuniyasu, Yuu; Kurimoto, Yoshinori; Lee, Seishu; Matsumoto, Hiroshi; Molodozhentsev, Alexander; Morita, Yuichi; Murasugi, Shigeru; Muto, Ryotaro; Naito, Fujio; Nakagawa, Hidetoshi; Nakamura, Shu; Niki, Kazuaki; Ohmi, Kazuhito; Ohmori, Chihiro; Okada, Masashi; Okamura, Katsuya; Oogoe, Takao; Ooya, Kazufumi; Sato, Kenichi; Sato, Yoichi; Sato, Yoshihiro; Satou, Kenichirou; Shimamoto, Masayuki; Shirakata, Masashi; Someya, Hirohiko; Sugimoto, Takuya; Takano, Junpei; Takeda, Yasuhiro; Takiyama, Yoichi; Tejima, Masaki; Toda, Makoto; Tomizawa, Masahito; Toyama, Takeshi; Uota, Masahiko; Yamada, Shuei; Yamamoto, Noboru; Yanaoka, Eiichi; Yoshii, Masahito; Harada, Hiroyuki; Hatakeyama, Shuichiro; Hotchi, Hideaki; Nomura, Masahiro; Schnase, Alexander; Shimada, Taihei; Tamura, Fumihiko; Yamamoto, Masanobu; Shimogawa, Tetsushi

    2012-01-01

    The slow cycling main ring synchrotron (MR) is located the furthest downstream in the J-PARC accelerator cascade. It became available for user operation in 2009 and provides high-intensity 30 GeV proton beams for various experiments on particle and nuclear physics. The MR has two beam extraction systems: a fast extraction system for beam delivery to the neutrino beam line of the Tokai-to-Kamioka (T2K) experiment and a slow extraction system for beam delivery to the hadron experimental hall. After a nine-month beam shutdown during the recovery from the Great East Japan Earthquake, the J-PARC facility resumed beam operation in December 2011. The MR delivers a 160-200 kW beam to the T2K experiment and a 3.5-6 kW beam to users in the hadron experimental hall. In this paper, a brief review of the MR and the recent status of beam operation are presented. Near-future plans for a beam intensity upgrade are also discussed. (author)

  1. Commissioning of the LHC

    CERN Multimedia

    CERN. Geneva

    2007-01-01

    The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.

  2. Commissioning and Operational Experience with 1 kW Class Helium Refrigerator/Liquefier for SST-1

    Science.gov (United States)

    Dhard, C. P.; Sarkar, B.; Misra, Ruchi; Sahu, A. K.; Tanna, V. L.; Tank, J.; Panchal, P.; Patel, J. C.; Phadke, G. D.; Saxena, Y. C.

    2004-06-01

    The helium refrigerator/liquefier (R/L) for the Steady State Super conducting Tokamak (SST-1) has been developed with very stringent specifications for the different operational modes. The total refrigeration capacity is 650 W at 4.5 K and liquefaction capacity of 200 l/h. A cold circulation pump is used for the forced flow cooling of 300 g/s supercritical helium (SHe) for the magnet system (SCMS). The R/L has been designed also to absorb a 200 W transient heat load of the SCMS. The plant consists of a compressor station, oil removal system, on-line purifier, Main Control Dewar (MCD) with associated heat exchangers, cold circulation pump and warm gas management system. An Integrated Flow Control and Distribution System (IFDCS) has been designed, fabricated and installed for distribution of SHe in the toroidal and poloidal field coils as well as liquid helium for cooling of 10 pairs of current leads. A SCADA based control system has been designed using PLC for R/L as well as IFDCS. The R/L has been commissioned and required parameters were achieved confirming to the process. All the test results and commissioning experiences are discussed in this paper.

  3. Model Commissioning Plan and Guide Specifications

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  4. Construction, start-up and operation of a continuously aerated ...

    African Journals Online (AJOL)

    scale SHARON reactor are discussed, along with the construction of the reactor. Special attention is given to the start-up in view of possible toxic effects of high nitrogen concentrations (up to 4 000 mgN·ℓ-1) on the nitrifier population and ...

  5. Construction and operation of a solar lighting system | Asuquo ...

    African Journals Online (AJOL)

    A solar lighting system which can make a 3w lamp glow continuously for about one hour if the battery is fully charged has been constructed. The device can be used for small-scale lighting applications in remote areas that are far away from the power grid. The system has a panel to collect the sun's energy, a battery to store ...

  6. Design, commissioning and operational results of wide dynamic range BPM switched electrode electronics

    International Nuclear Information System (INIS)

    Powers, T.; Doolittle, L.; Ursic, R.; Wagner, J.

    1997-01-01

    The Continuous Electron Beam Accelerator Facility (CEBAF) is a high-intensity, continuous-wave electron accelerator for nuclear physics. Total acceleration of 4 GeV is achieved by recirculating the beam through two 400-MeV linacs. The operating currents over which the linac beam position monitoring system must meet specifications are 1 μA to 1000 μA. A system was developed in 1994 and installed in the spring of 1995 that switches four electrode signals at 120 kHz through two signal-conditioning chains that use computer-controlled variable gain amplifiers with a dynamic range greater than 80 dB. The system timing was tuned to the machine recirculation period of 4.2 μs so that components of the multipass beam could be resolved in the linacs. Other features of this VME-based system include long-term stability and high-speed data acquisition, which make it suitable for use as both a time-domain diagnostic tool and as part of a variety of beam feedback systems. The computer interface has enough control over the hardware to make a thorough self-calibration and verification-of-operation routine possible. copyright 1997 American Institute of Physics

  7. LHC Beam Dump System: Analysis of beam commissioning, performance and the consequences of abnormal operation

    CERN Document Server

    Kramer, Thomas

    2011-01-01

    The LHC accelerates proton beams to a momentum of up to 7 TeV/c. At this energy level and with nominal beam intensity the stored energy of 360 MJ per beam is sufficient to melt 500 kg of copper. In addition up to 10 GJ are stored within the LHC magnet system at top energy. It is obvious that such a machine needs well designed safety and protection systems. The LHC Beam Dump System (LBDS) is such a system and one of the most critical once concerning machine protection and safe operation. It is used to dispose of high intensity beams between 450 GeV and 7 TeV and is thus designed to fast extract beam in a loss free way and to transfer it to an external absorber. For each ring systems of 15 horizontal fast kicker magnets (MKD), 15 vertically deflecting magnetic septa (MSD) and 10 diluter kicker magnets (MKB) are installed. This thesis is concerned with the analysis of the LBDS performance under normal operating parameters as well as under abnormal conditions like in the event of asynchronous beam abort or missin...

  8. The importance of layout and configuration data for flexibility during commissionning and operation of the LHC machine protection systems

    CERN Document Server

    Mariethoz, Julien; Le Roux, Pascal; Bernard, Frederic; Harrison, Robert; Zerlauth, Markus

    2006-01-01

    Due to the large stored energies in both magnets and particle beams, the Large Hadron Collider (LHC) requires a large inventory of machine protection systems, as e.g. powering interlock systems, based on a series of distributed industrial controllers for the protection of the more than 10'000 normal and superconducting magnets. Such systems are required to be at the same time fast, reliable and secure but also flexible and configurable to allow for automated commissioning, remote monitoring and optimization during later operation. Based on the generic hardware architecture of the LHC machine protection systems presented at EPAC 2002 [2] and ICALEPS 2003, the use of configuration data for protection systems in view of the required reliability and safety is discussed. To achieve the very high level of reliability, it is required to use a coherent description of the layout of the accelerator components and of the associated machine protection architecture and their logical interconnections. Mechanisms to guarant...

  9. Sustainability Criteria for Planning, Constructing, and Operating Contingency Bases

    Science.gov (United States)

    2012-05-22

    common PREREQ 1 Walkable Streets yes Planning, Desi gn, Construction, OaM Medium use areas. Plan careft,j!y to accommodate simftar functions in the...apjly the specific LEED·ND criteria. Pay special attention to roads that connect LSA ~ife support areas) to common Walkable Streets yes Planning... Walkable Streets  Intent: ►To promote transportation efficiency. ►To promote walking by providing: • Safe •Appealing •Comfortable street

  10. Construction of adjoint operators for coupled equations depending on different variables

    International Nuclear Information System (INIS)

    Hoogenboom, J.E.

    1986-01-01

    A procedure is described for the construction of the adjoint operator matrix in case of coupled equations defining quantities that depend on different sets of variables. This case is not properly treated in the literature. From this procedure a simple rule can be deduced for the construction of such adjoint operator matrices

  11. 75 FR 76444 - Environmental Impact Statement (EIS) for Construction and Operation of a Panoramic Survey...

    Science.gov (United States)

    2010-12-08

    ... potential environmental impacts associated with construction and operation of the proposed Panoramic Survey... DEPARTMENT OF DEFENSE Department of the Air Force Environmental Impact Statement (EIS) for Construction and Operation of a Panoramic Survey Telescope and Rapid Response System (Pan-STARRS) at the Summit...

  12. Operation environment construction of geological information database for high level radioactive waste geological disposal

    International Nuclear Information System (INIS)

    Wang Peng; Gao Min; Huang Shutao; Wang Shuhong; Zhao Yongan

    2014-01-01

    To fulfill the requirements of data storage and management in HLW geological disposal, a targeted construction method for data operation environment was proposed in this paper. The geological information database operation environment constructed by this method has its unique features. And it also will be the important support for HLW geological disposal project and management. (authors)

  13. Assessment of Blasting Operations Effects During Highway Tunnel Construction

    Directory of Open Access Journals (Sweden)

    Valašková Veronika

    2015-12-01

    Full Text Available Blasting operations are one of the fundamental parts of daily civil engineering. Drilling and blasting still remain the only possible ways of tunnelling in very adverse geological conditions. However, this method is a source of various disadvantages, the main one being tremors propagating through the geological environment which not only affect buildings, but also disturb the comfort of living in the vicinity of the source. Designing this procedure is mostly done using standardized empirical relations. This article shows the possibility of using a FEM technique in predicting blast effects. This approach is demonstrated in a simple case study on the impact of blasting operations on steel pipes.

  14. Wind Power Plants Fundamentals, Design, Construction and Operation

    CERN Document Server

    Twele, Jochen

    2012-01-01

    Wind power plants teaches the physical foundations of usage of Wind Power. It includes the areas like Construction of Wind Power Plants, Design, Development of Production Series, Control, and discusses the dynamic forces acting on the systems as well as the power conversion and its connection to the distribution system. The book is written for graduate students, practitioners and inquisitive readers of any kind. It is based on lectures held at several universities. Its German version it already is the standard text book for courses on Wind Energy Engineering but serves also as reference for practising engineers.

  15. Constructing Secure Mobile Agent Systems Using the Agent Operating System

    NARCIS (Netherlands)

    van t Noordende, G.J.; Overeinder, B.J.; Timmer, R.J.; Brazier, F.M.; Tanenbaum, A.S.

    2009-01-01

    Designing a secure and reliable mobile agent system is a difficult task. The agent operating system (AOS) is a building block that simplifies this task. AOS provides common primitives required by most mobile agent middleware systems, such as primitives for secure communication, secure and

  16. Construction, assembling and operation of an equipment for sodium purity

    International Nuclear Information System (INIS)

    Becquart, E.T.; Botbol, J.; Echenique, P.N.; Fruchtenicht, F.W.; Gil, D.A.; Perillo, P.; Vardich, R.N.; Vigo, D.E.

    1993-01-01

    The purpose of this work is the production of high purity metallic sodium for bench-scale, research studies. A stainless steel equipment was built and assembled, including high vacuum, heating and cooling systems. It was satisfactorily operated in two successive steps, filtration and vacuum distillation, with a good yield. (Author). 5 refs., 5 figs

  17. An introduction to the design, commissioning and operation of nuclear air cleaning systems for Qinshan Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    Xinliang Chen; Jiangang Qu; Minqi Shi [Shanghai Nuclear Engineering Research and Design Institute (China)] [and others

    1995-02-01

    This paper introduces the design evolution, system schemes and design and construction of main nuclear air cleaning components such as HEPA filter, charcoal adsorber and concrete housing etc. for Qinshan 300MW PWR Nuclear Power Plant (QNPP), the first indigenously designed and constructed nuclear power plant in China. The field test results and in-service test results, since the air cleaning systems were put into operation 18 months ago, are presented and evaluated. These results demonstrate that the design and construction of the air cleaning systems and equipment manufacturing for QNPP are successful and the American codes and standards invoked in design, construction and testing of nuclear air cleaning systems for QNPP are applicable in China. The paper explains that the leakage rate of concrete air cleaning housings can also be assured if sealing measures are taken properly and embedded parts are designed carefully in the penetration areas of the housing and that the uniformity of the airflow distribution upstream the HEPA filters can be achieved generally no matter how inlet and outlet ducts of air cleaning unit are arranged.

  18. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    Energy Technology Data Exchange (ETDEWEB)

    Kerrigan, P.

    2012-09-01

    BSC has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  19. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    Energy Technology Data Exchange (ETDEWEB)

    Kerrigan, Philip [Building Science Corporation, Somerville, MA (United States)

    2012-09-01

    Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  20. Commissioning performance activities of Heavy Water Plant (Hazira) (Paper No. 1.4)

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    Heavy Water Plant, Hazira is the fourth in the line of plants based on monothermal NH 3 -H 2 exchange process. The experience gained during operation of other heavy water plants is reflected in the construction, commissioning and operation of HWP, Hazira. This paper aims at outlining the strategy adopted for both commissioning and operation. (author)

  1. Development of brown coal liquefaction. Design, construction and operation of a 50 t/d pilot plant

    Energy Technology Data Exchange (ETDEWEB)

    1985-08-01

    As for the development of 50t/d pilot plant for the development of liquefaction plant of Victorian brown coal in Australia, outline of the results of the researches in 1984 is reported from the following 4 viewpoints; 1: design of process apparatuses, 2: manufacture of apparatuses, 3: field work of the construction, 4: preparation for operation of the plant. On the first item, the outline of ordering designed equipment from Japanese and Australian companies is described. On the second item the acceptance of purchasing goods from Japan and Australia and promotion of the inspection and quality assurance system. On the third item, contents of the continuous construction of the first stage are described. On the fourth item, the establishment and review of rules and regulations, training and education for operators, enviromental assessment, contents of safety and maintenance work and commissioning work by the promoting department for preparation of operation are described. Moreover support works of wide range for the promotion and adoption by necessary personnel, labour unions, the state of labour and activities for local discricts are described.

  2. Significant advantages of the safety-first concept in construction, operation, and maintenance of the Westinghosue AP1000 reactor

    International Nuclear Information System (INIS)

    Cummins, E.; Benitz, K.

    2004-01-01

    In June 2003, the U.S. Nuclear Regulatory Commission (USNRC) published a draft opinion about safety of the AP1000 Westinghouse pressurized water reactor with 'passive safety' features. The report constitutes an important milestone in the development of the next generation of safe and cost-efficient nuclear power plants. A new AP1000 can be absolutely competitive with fossil fired power plants and may be able to revive the construction of new nuclear power plants worldwide. The reason for designing the AP1000 were safety considerations. The use of passive safety systems at the same time entails a considerable reduction in the costs of design, maintenance, and operation of an AP1000 plant. Independent experts confirmed that an AP1000 can be erected within three years or even less. The estimated electricity generating costs of an AP1000 plant in the United States amount to US Cent 3.2 to 3.6 per kilowatthour. (orig.)

  3. Large Scale Commissioning and Operational Experience with Tier-2 to Tier-2 Data Transfer Links in CMS

    CERN Document Server

    Letts, James

    2010-01-01

    Tier-2 to Tier-2 data transfers have been identified as a necessary extension of the CMS computing model. The Debugging Data Transfers (DDT) Task Force in CMS was charged with commissioning Tier-2 to Tier-2 PhEDEx transfer links beginning in late 2009, originally to serve the needs of physics analysis groups for the transfer of their results between the storage elements of the Tier-2 sites associated with the groups. PhEDEx is the data transfer middleware of the CMS experiment. For analysis jobs using CRAB, the CMS Remote Analysis Builder, the challenges of remote stage out of job output at the end of the analysis jobs led to the introduction of a local fallback stage out, and will eventually require the asynchronous transfer of user data over essentially all of the Tier-2 to Tier-2 network using the same PhEDEx infrastructure. In addition, direct file sharing of physics and Monte Carlo simulated data between Tier-2 sites can relieve the operational load of the Tier-1 sites in the original CMS Computing Model...

  4. Design, construction, operation, shutdown and surveillance of repositories for solid radioactive wastes in shallow ground

    International Nuclear Information System (INIS)

    1984-01-01

    This report is a part of the IAEA publications under its Programme on Underground Disposal of Radioactive Wastes and is addressed to administrative and technical authorities and specialists who consider the shallow-ground disposal of low- and intermediate-level solid radioactive wastes of short half-lives. The report emphasizes the technological aspects, however it briefly discusses the safety philosophy and regulatory considerations too. The design, construction, operation, shutdown and surveillance of the repositories in shallow ground are considered in some detail, paying special attention to their interrelated aspects. In particular, a review is given of the following aspects: main design and construction considerations in relation to the natural features of the site; design and construction aspects during the repository development process; activities related to operational and post-operational stages of the repository; major steps in repository operation and essential activities in shutdown and operational and post-operational surveillance

  5. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    Science.gov (United States)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  6. The licensing procedure for construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Salvatore, J.E.L.

    1980-03-01

    The licensing procedure for the construction and operation of the nuclear power plants in Brazil is analysed, according to the International Atomic Energy Agency orientation. The risks related to the nuclear energy is also emphasized. (A.L.) [pt

  7. Status and commissioning of the CMS experiment

    Science.gov (United States)

    Wulz, C.-E.

    2008-05-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  8. Status and Commissioning of the CMS Experiment

    CERN Document Server

    Wulz, Claudia-Elisabeth

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  9. Status and commissioning of the CMS experiment

    International Nuclear Information System (INIS)

    Wulz, C-E

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented

  10. 75 FR 55631 - U. S. Rail Corporation-Construction and Operation Exemption-Brookhaven Rail Terminal

    Science.gov (United States)

    2010-09-13

    ... the proposed construction is to enable U. S. Rail to serve the BRT as a common carrier and to deliver... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35141] U. S. Rail Corporation--Construction and Operation Exemption-- Brookhaven Rail Terminal AGENCY: Surface Transportation...

  11. A Neo-Piagetian Theory of Constructive Operators: Applications to Perceptual-Motor Development and Learning.

    Science.gov (United States)

    Todor, John I.

    The author presents an overview of Pascual-Leone's Theory of Constructive Operators, a process-structural theory based upon Piagetian constructs which has evolved to both explain and predict the temporal unfolding of behavior. An application is made of the theory to the demands of a discrete motor task and prediction of (a) the minimal age…

  12. Chiral measurements with the Fixed-Point Dirac operator and construction of chiral currents

    International Nuclear Information System (INIS)

    Hasenfratz, P.; Hauswirth, S.; Holland, K.; Joerg, T.; Niedermayer, F.

    2002-01-01

    In this preliminary study, we examine the chiral properties of the parametrized Fixed-Point Dirac operator D FP , see how to improve its chirality via the Overlap construction, measure the renormalized quark condensate Σ-circumflex and the topological susceptibility χ t , and investigate local chirality of near zero modes of the Dirac operator. We also give a general construction of chiral currents and densities for chiral lattice actions

  13. Design,construction and commissioning of a cylinder of double-sided silicon micro-strips detectors for the Star experiment at RHIC

    International Nuclear Information System (INIS)

    Guedon, M.

    2005-05-01

    This study has been performed in the frame of quark gluon plasma physics research in the STAR experiment at RHIC. It deals with the design, the construction and the commissioning of a barrel of silicon-strip detectors (SSD). Added to the Silicon Vertex Tracker (SVT) of the STAR detector, it extends the capabilities of track reconstruction for charged particles emitted in ultra-relativistic heavy-ion collisions. It also contributes to the general study of the quark-gluon plasma production undertaken at STAR. The SSD is a cylinder of 1 m long and of 23 cm radius, and it is composed of 320 compact identical modules. Each module includes one double-sided silicon micro-strip detector, 12 readout chips ALICE 128C, 12 TAB ribbons, 2 COSTAR control chips and 2 hybrids supporting all the components. The document explains why the SSD is an important and relevant element, and justifies the technological choices as well as their validation by in-beam characterization. All component functionalities, characteristics and test procedures are presented. The data and test results are stored in a database for tracing purpose. Component and module production is described. Two parallel studies have been performed, analysed and described. One on the temperature dependence of the module performances and the other one on the optimal adjustments of the analogue blocks inside the ALICE 128C chip. The SSD installation on the RHIC site as well as the commissioning are presented together with the first data takings. (author)

  14. Metropolitan Transportation Commission, San Francisco Bay area : developing regional objectives and performance measures to improve system operations

    Science.gov (United States)

    2009-04-01

    The Metropolitan Transportation Commission (MTC) uses an objectives-driven, performance-based approach in its transportation planning for the San Francisco Bay Area. This approach focuses attention on transportation investments of highest priority. T...

  15. Point-form electrodynamics and the construction of conserved current operators

    International Nuclear Information System (INIS)

    Klink, W.H.

    2003-01-01

    A general procedure for constructing conserved electromagnetic current operators in the presence of hadronic interactions is given. The four-momentum operator in point-form relativistic quantum mechanics is written as the sum of hadronic, photon, and electromagnetic four-momentum operators, where the electromagnetic four-momentum operator is generated from a vertex operator, in which a conserved current operator is contracted with the four-vector potential operator. The current operator is the sum of free, dynamically determined and model-dependent operators. The dynamically determined current operator is formed form a free current operator and the interacting hadronic four-momentum operator, in such a way that the sum of free and dynamically determined current operators is conserved with respect to the hadronic interactions. The model-dependent operator is a many-body current operator, formed as the commutator of an antisymmetric operator with the hadronic four-momentum operator. It is shown that such an operator is also conserved with respect to the hadronic interactions and also does not renormalize the charge. Refs. 9 (author)

  16. Construction and operation of an industrial solid waste landfill at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-10-01

    The US Department of Energy (DOE), Office of Waste Management, proposes to construct and operate a solid waste landfill within the boundary of the Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Ohio. The purpose of the proposed action is to provide PORTS with additional landfill capacity for non-hazardous and asbestos wastes. The proposed action is needed to support continued operation of PORTS, which generates non-hazardous wastes on a daily basis and asbestos wastes intermittently. Three alternatives are evaluated in this environmental assessment (EA): the proposed action (construction and operation of the X-737 landfill), no-action, and offsite shipment of industrial solid wastes for disposal.

  17. Construction and operation of an industrial solid waste landfill at Portsmouth Gaseous Diffusion Plant, Piketon, Ohio

    International Nuclear Information System (INIS)

    1995-10-01

    The US Department of Energy (DOE), Office of Waste Management, proposes to construct and operate a solid waste landfill within the boundary of the Portsmouth Gaseous Diffusion Plant (PORTS), Piketon, Ohio. The purpose of the proposed action is to provide PORTS with additional landfill capacity for non-hazardous and asbestos wastes. The proposed action is needed to support continued operation of PORTS, which generates non-hazardous wastes on a daily basis and asbestos wastes intermittently. Three alternatives are evaluated in this environmental assessment (EA): the proposed action (construction and operation of the X-737 landfill), no-action, and offsite shipment of industrial solid wastes for disposal

  18. Design, construction, and operation of SciFi tracking detector for K2K experiment

    International Nuclear Information System (INIS)

    Suzuki, A.; Park, H.; Aoki, S.; Echigo, S.; Fujii, K.; Hara, T.; Iwashita, T.; Kitamura, M.; Kohama, M.; Kume, G.; Onchi, M.; Otaki, T.; Sato, K.; Takatsuki, M.; Takenaka, K.; Tanaka, Y.; Tashiro, K.; Inagaki, T.; Kato, I.; Mukai, S.; Nakaya, T.; Nishikawa, K.; Sasao, N.; Shima, A.; Yokoyama, H.; Chikamatsu, T.; Hayato, Y.; Ishida, T.; Ishii, T.; Ishino, H.; Jeon, E.J.; Kobayashi, T.; Lee, S.B.; Nakamura, K.; Oyama, Y.; Sakai, A.; Sakuda, M.; Tumakov, V.; Fukuda, S.; Fukuda, Y.; Ishizuka, M.; Itow, Y.; Kajita, T.; Kameda, J.; Kaneyuki, K.; Kobayashi, K.; Kobayashi, Y.; Koshio, Y.; Miura, M.; Moriyama, S.; Nakahata, M.; Nakayama, S.; Obayashi, Y.; Okada, A.; Sakurai, N.; Shiozawa, M.; Suzuki, Y.; Takeuchi, H.; Takeuchi, Y.; Totsuka, Y.; Toshito, T.; Yamada, S.; Miyano, K.; Nakamura, M.; Tamura, N.; Nakano, I.; Yoshida, M.; Kadowaki, T.; Kishi, S.; Yokoyama, H.; Maruyama, T.; Etoh, M.; Nishijima, K.; Bhang, H.C.; Khang, B.H.; Kim, B.J.; Kim, H.I.; Kim, J.H.; Kim, S.B.; So, H.; Yoo, J.H.; Choi, J.H.; Jang, H.I.; Jang, J.S.; Kim, J.Y.; Lim, I.T.; Pac, M.Y.; Kearns, E.; Scholberg, K.; Stone, J.L.; Sulak, L.R.; Walter, C.W.; Casper, D.; Gajewski, W.; Kropp, W.; Mine, S.; Sobel, H.; Vagins, M.; Matsuno, S.; Hill, J.; Jung, C.K.; Martens, K.; Mauger, C.; McGrew, C.; Sharkey, E.; Yanagisawa, C.; Berns, H.; Boyd, S.; Wilkes, J.; Kielczewska, D.; Golebiewska, U.

    2000-01-01

    We describe the construction and performance of a scintillating fiber detector used in the near detector for the K2K (KEK to Kamioka, KEK E362) long baseline neutrino oscillation experiment. The detector uses 3.7 m long and 0.692 mm diameter scintillating fiber coupled to image-intensifier tubes (IIT), and a CCD camera readout system. Fiber sheet production and detector construction began in 1997, and the detector was commissioned in March 1999. Results from the first K2K runs confirm good initial performance: position resolution is estimated to be about 0.8 mm, and track finding efficiency is 98±2% for long tracks (i.e., those which intersect more than 5 fiber planes). The hit efficiency was estimated to be 92±2% using cosmic-ray muons, after noise reduction at the offline stage. The possibility of using the detector for particle identification is also discussed

  19. 25 CFR 700.467 - Construction costs.

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction costs. 700.467 Section 700.467 Indians THE OFFICE OF NAVAJO AND HOPI INDIAN RELOCATION COMMISSION OPERATIONS AND RELOCATION PROCEDURES Discretionary Funds § 700.467 Construction costs. Construction costs and costs relating to construction such as...

  20. A selective study of Information technologies to improve operations efficiency in construction

    Directory of Open Access Journals (Sweden)

    Konikov Alexandr

    2018-01-01

    Full Text Available Today, information technologies (IT are used in almost every production industry. While the aspects of IT are well studied and discussed in relevant monographs, articles, web sources, etc., this paper reviews the performance improvement options in the construction industry by leveraging IT. From a wide range of information technologies the author has picked the most relevant solutions, from his point of view, based on several considerations, the most important one being the lack of adequate attention to these technologies specifically in the construction industry. The paper covers the following technologies: Big Data (a smart technology for high-speed processing of huge and diverse data arrays; situation centers (SC for construction and operations projects (SCs are successfully used in other industries for operating control of sophisticated facilities; data warehouses (DW for the construction industry (DWs are viewed as a standalone project rather than a supplement to Data Mining or Big Data; operational and dispatch radio communication service (radio communication can ensure instant connectivity between several subscribers; VSAT (a satellite technology for prompt connection of a distant construction site with the 'outer world' when no alternatives are available. The paper briefly presents the essence of each technology, describes the pre-requisites for its use in construction, outlines the key advantages, limits and shortcomings, and lists construction projects where it shall be worthwhile to use a specific technology projects.

  1. Classification and Construction of Invertible Linear Differential Operators on a One-Dimensional Manifold

    Directory of Open Access Journals (Sweden)

    V. N. Chetverikov

    2014-01-01

    Full Text Available Invertible linear differential operators with one independent variable are investigated. The problem of description of such operators is important, because it is connected with transformations and the classification of control systems, in particular, with the flatness problem.Each invertible linear differential operator represents a square matrix of scalar differential operators. Its product with an operator-column is an operator-column whose order does not exceed the sum of orders of initial operators. The operators-columns, the product with which leads to order fall, i.e. the order of the product is less than sum of orders of factors, are interesting for the description of invertible operators. In this paper the classification of invertible operators is based on dimensions dk,p of intersections of modules Gp and Fk for various k and p, where Gp is the module of all operators-columns of order not above p, and Fk is the module of compositions of the invertible operator with all operators-columns of order not above k. The invertible operators that have identical sets of numbers dk,p form one class.In the paper the general properties of tables of numbers dk,p for invertible operators are investigated. A correspondence between invertible operators and elementary-geometrical models which in the paper are named by d-schemes of squares is constructed. The invertible operator is ambiguously defined by its d-scheme of squares. The mathematical structure that must be set for its unique definition and an algorithm for the construction of the invertible operator are offered.In the proof of the main result, methods of the theory of chain complexes and their spectral sequences are used. In the paper all necessary concepts of this theory are formulated and the corresponding facts are proved.Results of the paper can be used for solving problems in which invertible linear differential operators are arisen. Namely, it is necessary to formulate the conditions on

  2. BIM-Integrated Construction Operation Simulation for Just-In-Time Production Management

    Directory of Open Access Journals (Sweden)

    WoonSeong Jeong

    2016-10-01

    Full Text Available Traditional construction planning, which depends on historical data and heuristic modification, prevents the integration of managerial details such as productivity dynamics. Specifically, the distance between planning and execution brings cost overruns and duration extensions. To minimize variations, this research presents a Building Information Modeling (BIM-integrated simulation framework for predicting productivity dynamics at the construction planning phase. To develop this framework, we examined critical factors affecting productivity at the operational level, and then forecast the productivity dynamics. The resulting plan includes specific commands for retrieving the required information from BIM and executing operation simulations. It consists of the following steps: (1 preparing a BIM model to produce input data; (2 composing a construction simulation at the operational level; and (3 obtaining productivity dynamics from the BIM-integrated simulation. To validate our framework, we applied it to a structural steel model; this was due to the significance of steel erections. By integrating BIM with construction operation simulations, we were able to create reliable construction plans that adapted to project changes. Our results show that the developed framework facilitates the reliable prediction of productivity dynamics, and can contribute to improved schedule reliability, optimized resource allocation, cost savings associated with buffers, and reduced material waste.

  3. Recent results of PADReS, the Photon Analysis Delivery and REduction System, from the FERMI FEL commissioning and user operations.

    Science.gov (United States)

    Zangrando, Marco; Cocco, Daniele; Fava, Claudio; Gerusina, Simone; Gobessi, Riccardo; Mahne, Nicola; Mazzucco, Eric; Raimondi, Lorenzo; Rumiz, Luca; Svetina, Cristian

    2015-05-01

    The Photon Analysis Delivery and REduction System of FERMI (PADReS) has been routinely used during the machine commissioning and operations of FERMI since 2011. It has also served the needs of several user runs at the facility from late 2012. The system is endowed with online and shot-to-shot diagnostics giving information about intensity, spatial-angular distribution, spectral content, as well as other diagnostics to determine coherence, pulse length etc. Moreover, PADReS is capable of manipulating the beam in terms of intensity and optical parameters. Regarding the optics, besides a standard refocusing system based on an ellipsoidal mirror, the Kirkpatrick-Baez active optics systems are key elements and have been used intensively to meet users' requirements. A general description of the system is given, together with some selected results from the commissioning/operations/user beam time.

  4. Safe LHC beam commissioning

    International Nuclear Information System (INIS)

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  5. Explicit construction of quasiconserved local operator of translationally invariant nonintegrable quantum spin chain in prethermalization

    Science.gov (United States)

    Lin, Cheng-Ju; Motrunich, Olexei I.

    2017-12-01

    We numerically construct translationally invariant quasiconserved operators with maximum range M , which best commute with a nonintegrable quantum spin chain Hamiltonian, up to M =12 . In the large coupling limit, we find that the residual norm of the commutator of the quasiconserved operator decays exponentially with its maximum range M at small M , and turns into a slower decay at larger M . This quasiconserved operator can be understood as a dressed total "spin-z " operator, by comparing with the perturbative Schrieffer-Wolff construction developed to high order reaching essentially the same maximum range. We also examine the operator inverse participation ratio of the operator, which suggests its localization in the operator Hilbert space. The operator also shows an almost exponentially decaying profile at short distance, while the long-distance behavior is not clear due to limitations of our numerical calculation. Further dynamical simulation confirms that the prethermalization-equilibrated values are described by a generalized Gibbs ensemble that includes such quasiconserved operator.

  6. Commissioning and operation of 130 kV/130 A switched-mode HV power supplies with the upgraded JET neutral beam injectors

    International Nuclear Information System (INIS)

    Edwards, D.C.; Bigi, M.; Brown, D.P.D.; Ganuza, D.; Garcia, F.; Hudson, Z.; Jones, T.T.C.; Perez, A.

    2005-01-01

    The design features, on-site testing, commissioning and operation are described of two new 130 kV/130 A HV power supply units serving four upgraded 130 kV/60 A positive ion neutral injectors (PINIs) on JET. Both units were factory tested at full power and pulse length into dummy resistive load. Following on-site installation, the factory tests were repeated. The transition from dummy-load testing to PINI operation required full integration of the HVPS within the overall JET control system, and rigorous testing of the co-ordinated actions and protections of all PINI power supplies (filament and arc for plasma source and negative suppression grid). The implementation of these functions is described. Extensive use was made of parasitic integrated test pulses, where the other PINIs could be operated normally, with the HVPS energised under full remote control together with the corresponding PINI plasma sources, but with the HVPS connected to dummy load. The amount of NB operation time dedicated to commissioning was thereby minimised, yet gave a high degree of confidence of readiness for HV energisation of the PINI, and first beam operation followed less than 24 h from HV connection to the PINI. The routine operating experience and performance, including load protection characteristics of the new HVPS units are also described

  7. Spherical and plane integral operators for PDEs construction, analysis, and applications

    CERN Document Server

    Sabelfeld, Karl K

    2013-01-01

    The book presents integral formulations for partial differential equations, with the focus on spherical and plane integral operators. The integral relations are obtained for different elliptic and parabolic equations, and both direct and inverse mean value relations are studied. The derived integral equations are used to construct new numerical methods for solving relevant boundary value problems, both deterministic and stochastic based on probabilistic interpretation of the spherical and plane integral operators.

  8. Conceptual design and analysis of roads and road construction machinery for initial lunar base operations

    Science.gov (United States)

    Sines, Jeffrey L.; Banks, Joel; Efatpenah, Keyanoush

    1990-01-01

    Recent developments have made it possible for scientists and engineers to consider returning to the Moon to build a manned lunar base. The base can be used to conduct scientific research, develop new space technology, and utilize the natural resources of the Moon. Areas of the base will be separated, connected by a system of roads that reduce the power requirements of vehicles traveling on them. Feasible road types for the lunar surface were analyzed and a road construction system was designed for initial lunar base operations. A model was also constructed to show the system configuration and key operating features. The alternate designs for the lunar road construction system were developed in four stages: analyze and select a road type; determine operations and machinery needed to produce the road; develop machinery configurations; and develop alternates for several machine components. A compacted lunar soil road was selected for initial lunar base operations. The only machinery required to produce this road were a grader and a compactor. The road construction system consists of a main drive unit which is used for propulsion, a detachable grader assembly, and a towed compactor.

  9. Changing priorities of codes and standards -- quality engineering: Experiences in plant construction, maintenance, and operation

    International Nuclear Information System (INIS)

    Antony, D.D.; Suleski, P.F.; Meier, J.C.

    1994-01-01

    Application of the ASME Code across various fossil and nuclear plants necessitates a Company approach adapted by unique status of each plant. This arises from State Statutes, Federal Regulations and consideration of each plant's as-built history over a broad time frame of design, construction and operation. Additionally, the National Board Inspection Code accompanies Minnesota Statutes for plants owned by Northern States Power Company. This paper addresses some key points on NSP's use of ASME Code as a principal mechanical standard in plant design, construction and operation. A primary resource facilitating review of Code provisions is accurate status on current plant configuration. As plant design changes arise, the Code Edition/Addenda of original construction and installed upgrades or replacements are considered against available options allowed by current standards and dialog with the Jurisdictional Authority. Consistent with the overall goal of safe and reliable plant operation, there are numerous Code details and future needs to be addressed in concert with expected plant economics and planned outages for implementation. The discussion begins in the late 60's with new construction of Monticello and Prairie Island (both nuclear), through Sherburne County Units 1 through 3 (fossil), and their changes, replacements or repairs as operating plants

  10. Defense Infrastructure: Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations

    Science.gov (United States)

    2016-09-01

    supporting documentation for reviews that the U.S. Forces-Afghanistan conducted beginning in November 2011 of planned or ongoing contingency ...12 Contingency basing includes the planning , designing, constructing, operating, managing, and transitioning or closing of a non-enduring location...2016). Background Definition of “ Contingency Construction” Project Page 7 GAO-16-406 Defense Infrastructure statutory authority

  11. 78 FR 75359 - Waterway Suitability Assessment for Construction and Operation of Liquefied Gas Terminals; Orange...

    Science.gov (United States)

    2013-12-11

    ... Assessment for Construction and Operation of Liquefied Gas Terminals; Orange, TX AGENCY: Coast Guard, DHS... waterfront facility handling and storing Liquefied Hazardous Gas (LHG) at its Orange, Texas facility. The... LHG marine traffic in the associated waterway. INVISTA, S.a.r.l. located in Orange, Texas submitted an...

  12. The primary ion source for construction and optimization of operation parameters

    International Nuclear Information System (INIS)

    Synowiecki, A.; Gazda, E.

    1986-01-01

    The construction of primary ion source for SIMS has been presented. The influence of individual operation parameters on the properties of ion source has been investigated. Optimization of these parameters has allowed to appreciate usefulness of the ion source for SIMS study. 14 refs., 8 figs., 2 tabs. (author)

  13. Developmental Differences in Motor Task Integration: A Test of Pascual-Leone's Theory of Constructive Operators.

    Science.gov (United States)

    Todor, John I.

    1979-01-01

    Assesses the ability of Pascual-Leone's Theory of Constructive Operators to predict the minimum age or maturational level at which integration of a motor task could be achieved. Subjects were 114 elementary school children ranging in age from 5 to 12. (Author/MP)

  14. Canonical construction of differential operators intertwining representations of real semisimple Lie groups

    International Nuclear Information System (INIS)

    Dobrev, V.K.

    1986-11-01

    Let G be a real linear connected semisimple Lie group. We present a canonical construction of the differential operators intertwining elementary (≡ generalized principal series) representations of G. The results are easily extended to real linear reductive Lie groups. (author). 20 refs

  15. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  16. [Commissioning of the newly constructed Beijing electron-positron collider BEPC, Beijing, China, and visit to SRRC to discuss magnet manufacturing and measurement methods, Taipei, Taiwan, November 11--27, 1988]: Foreign trip report

    International Nuclear Information System (INIS)

    Weng, W.T.

    1988-01-01

    The traveller was invited to IHEP to participate in the commissioning of the newly constructed Beijing electron-positron collider BEPC, give a status report on the AGS Booster Project and to assess the feasibility of sub-contracting booster sextupoles to IHEP. The trip to SRRC was undertaken to discuss magnet manufacturing and measurement methods

  17. Determination of total flow rate and flow rate of every operating branch in commissioning of heavy water loop for ARR-2

    International Nuclear Information System (INIS)

    Han Yan

    1997-01-01

    The heavy water loop (i,e, RCS) for ARR-2 in Algeria is a complex loop. Flow regulating means are not provided by the design in order to operate the reactor safely and simplify operating processes. How to determine precisely the orifice diameters of resistance parts for the loop is a key point for decreasing deviation between practical and design flow rates. Commissioning tests shall ensure that under every one of combined operating modes for the pumps, total coolant flow rate is about the same (the number of pumps operating in parallel is the same) and is consistent with design requirement, as well as the distribution of coolant flow rate to every branch is uniform. The flow Determination is divided into two steps. First and foremost, corresponding resistance part at each pump outlet is determined in commissioning test of shorted heavy water loop with light water, so that the problem about uniform distribution of the flow rate to each branch is solved, Secondly, resistance part at the reactor inlet is determined in commissioning test of heavy water loop connected with the vessel, so that the problem about that total heavy water flow rate is within optimal range is solved. According to practical requirements of the project, a computer program of hydraulic calculation and analysis for heavy water loop has been developed, and hydraulic characteristics test for a part of loop has been conducted in order to correct calculation error. By means of program calculation combining with tests in site, orifice diameters of 9 resistance parts has been determined rapidly and precisely and requirements of design and operation has been met adequately

  18. Design, construction, commissioning and long term operational experience with the D0 Uranium/Liquid Argon calorimeter

    OpenAIRE

    Schamberger, Dean

    2014-01-01

    The D0 experiment was designed in the mid 1980s and ran at the Fermilab pp collider from 1992 through 2011. I describe the uranium-liquid argon calorimeter and its readout electronic which was upgraded in the late 1990s to handle the higher luminosity of the upgraded Tevatron during its second running period from 2001-2011. I summarize maintaining the calorimeter for 20 years of data taking. I further describe a few issues that arose during that time, including different types of noise and th...

  19. Field theoretical construction of an infinite set of quantum commuting operators related with soliton equations

    International Nuclear Information System (INIS)

    Sasaki, Ryu; Yamanaka, Itaru

    1987-01-01

    The quantum version of an infinite set of polynomial conserved quantities of a class of soliton equations is discussed from the point of view of naive continuum field theory. By using techniques of two dimensional field theories, we show that an infinite set of quantum commuting operators can be constructed explicitly from the knowledge of its classical counterparts. The quantum operators are so constructed as to coincide with the classical ones in the ℎ → 0 limit (ℎ; Planck's constant divided by 2π). It is expected that the explicit forms of these operators would shed some light on the structure of the infinite dimensional Lie algebras which underlie a certain class of quantum integrable systems. (orig.)

  20. Surface facilities for geological deep repositories - Measures against dangers during construction and operation

    International Nuclear Information System (INIS)

    2013-09-01

    This brochure published by the Swiss National Cooperative for the Disposal of Radioactive Waste (NAGRA) discusses the measures that are to be taken to address the dangers encountered during the construction and operation of deep geological repositories for nuclear wastes. Firstly, the operation of such repositories during the emplacement of nuclear wastes is discussed and examples of possible repositories for fuel rods and highly-radioactive waste are presented. Various emission-protection issues and safety measures to be taken during construction of such repositories are looked at as is the protection of ground water. Safety considerations during the operational phase are discussed, including inclusion methods used for the wastes and radiation protection. The handling of radioactive wastes, the recognition of dangers and measures to be taken to counteract them are discussed. Various possible accidents are looked at

  1. Field theoretical construction of an infinite set of quantum commuting operators related with soliton equations

    International Nuclear Information System (INIS)

    Sasaki, Ryu; Yamanaka, Itaru.

    1986-08-01

    The quantum version of an infinite set of polynomial conserved quantities of a class of soliton equations is discussed from the point of view of naive continuum field theory. By using techniques of two dimensional field theories, we show that an infinite set of quantum commuting operators can be constructed explicitly from the knowledge of its classical counterparts. The quantum operators are so constructed as to coincide with the classical ones in the ℎ → 0 limit (ℎ; Planck's constant divided by 2π). It is expected that the explicit forms of these operators would shed some light on the structure of the infinite dimensional Lie algebras which underlie certain class of quantum integrable systems. (author)

  2. Construction techniques and operation principles of Geiger-Mueller counters using external cathode (Mazetype)

    International Nuclear Information System (INIS)

    Sevegnani, F.X.

    1988-01-01

    The construction techniques for external cathode (Maze) and internal cathode Geiger-Muller counters are described, showing the operation principles and the used material nature. More than 200 counter types were evaluated analysing their characteristics. The influence of several types of guard-rings was studied, for optimizing counter operation conditions. Plateaus of the order of 700 V with slope of 0,3%/100 V for the net counting rate, and 1400 V with a slope of 0,8/100 V for total counts using total pressure of 10 cmHg, were obtained. A counter for β detection, using blown glass window in one of the edges of the cylinder was constructed. Counters of long life using materials such as, mica, adhesive glues, etc., were obtained. The results shown that the best counter operation occurs when it is empty in a vacuum of 10 -5 mmHg. (M.C.K.) [pt

  3. Technical data for concentrated solar power plants in operation, under construction and in project

    Directory of Open Access Journals (Sweden)

    Ugo Pelay

    2017-08-01

    Full Text Available This article presents technical data for concentrated solar power (CSP plants in operation, under construction and in project all over the world in the form of tables. These tables provide information about plants (e.g., name of the CSP plant, country of construction, owner of the plant, aim of the plant and their technical characteristics (e.g., CSP technology, solar power, area of the plant, presence and type of hybridization system, electricity cost, presence and type of TES, power cycle fluid, heat transfer fluid, operating temperature, operating pressure, type of turbine, type and duration of storage, etc.. Further interpretation of the data and discussions on the current state-of-the-art and future trends of CSP can be found in the associated research article (Pelay et al., 2017 [1].

  4. Assessment of the impact of nuclear power plant construction and operation on small regions

    International Nuclear Information System (INIS)

    Johnson, M.H. Jr.

    1977-01-01

    This study addresses the problem of the comprehensive, quantitative evaluation of the environmental, economic, and social impacts of the construction and operation of nuclear power plant on a given region. A theoretical model of the regional impacts is constructed employing input-output methods that are extended to include ecologic as well as economic effects. Thus, the regional model explicitly incorporates environmental feedback as a consequence of economic activity. The model is then employed to estimate the impact of the construction and operation of a nuclear power facility on a small region in South Carolina. Measures of economic and environmental effects include estimates of changes in output, income, employment, local government revenue and expenditure, external costs of environmental decay, pollution loads, and common-property resource usage. Results indicate that, in the South Carolina case study, significant gains in social welfare accrued to the region due to the construction and operation of the nuclear power facility. Further, the theoretical method developed herein provides a comprehensive method of objectively assessing various types of impacts on a region as small as several contiguous counties or even a single county

  5. Design, construction, and operation of the contact size reduction facility at the West Valley Demonstration Project

    International Nuclear Information System (INIS)

    Frank, D.E.; Reeves, S.R.; Valenti, P.J.

    1988-05-01

    This paper describes the design, construction and initial operation of the Contact-Handled Size Reduction Facility (CSRF) at the West Valley Demonstration Project. The facility was constructed to size reduce contaminated tanks, piping, and other metallic scrap and package the scrap for disposal. In addition, the CSRF has the capability to decontaminate scrap prior to disposal. The anticipated result of decontaminating the scrap is to reduce waste classified as transuranic or low-level Class B and C to Class A or release for unrestricted use as nonradioactive equipment. 10 figs., 1 tab

  6. Commissioning MMS

    Science.gov (United States)

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  7. The Hydraulic Project Włocławek: Design, Studies, Construction and Operation

    Directory of Open Access Journals (Sweden)

    Wojciech Majewski

    2015-03-01

    Full Text Available The Hydraulic Project Włocławek was commissioned in 1970 as the first barrage of the Lower Vistula Cascade (LVC. The purpose of the LVC was to create an important source of hydro-energy and inland navigation route connecting central Poland with the port city of Gdańsk. Along the Lower Vistula (LV important cities and industrial centres are located. The Włocławek project still remains the only barrage on the LV thus creating a number of problems. The paper presents the basic hydrological and hydraulic data for the Vistula river, and describes the Włocławek project, hydraulic model investigations conducted in the design phase, the construction of the project and the main problems, attendant on its use, including the winter flood of 1982 in the upper part of the Włocławek reservoir. The paper ends with conclusions on project construction and exploitation. The next barrage downstream from Włocławek is proposed.

  8. ATF2 Commissioning

    Energy Technology Data Exchange (ETDEWEB)

    Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  9. ATF2 COMMISSIONING

    CERN Document Server

    Seryi, A; Parker, B; Schulte, D; Delahaye, J P; Tomas, R; Zimmermann, F; Wolski, A; Elsen, E; Sanuki, T; Gianfelice-Wendt, E; Ross, M; Wendt, M; Takahashi, T; Bai, S; Gao, J; Bolzon, B; Geffroy, N; Jeremie, A; Apsimon, R; Burrows, P; Constance, B; Perry, C; Resta-Lopez, J; Swinson, C; Araki, S; Aryshev, A; Hayano, H; Honda, Y; Kubo, K; Kume, T; Kuroda, S; Masuzawa, M; Naito, T; Okugi, T; Sugahara, R; Tauchi, T; Terunuma, N; Urakawa, J; Yokoya, K; Iwashita, Y; Sugimoto, T; Heo, A Y; Kim, E S; Kim, H S; Bambade, P; Renier, Y; Rimbault, C; Huang, J Y; Kim, S H; Park, Y J; Hwang, W H; Blair, G; Boogert, S; Karataev, P; Molloy, S; Amann, J; Bellomo, P; Lam, B; McCormick, D; Nelson, J; Paterson, E; Pivi, M; Raubenheimer, T; Spencer, C; Wang, M H; White, G; Wittmer, W; Woodley, M; Yan, Y; Zhou, F; Angal-Kalinin, D; Jones, J; Lyapin, A; Scarfe, A; Kamiya, Y; Komamiya, S; Oroku, M; Suehara, T; Yamanaka, T

    2010-01-01

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  10. NVENTIONS IN THE NANOTECHNOLOGICAL AREA PROVIDE INCREASED RESISTANCE OF CONSTRUCTION MATERIALS AND PRODUCTS TO OPERATIONAL LOAD

    Directory of Open Access Journals (Sweden)

    VLASOV Vladimir Alexeevich

    2013-12-01

    Full Text Available The invention «Dispersion of Carbon Nanotubes (RU 2494961» can be used in production of modifying additives for construction materials. Dispersion of carbon nanotubes contains, mass %: carbon nanotubes 1–20; surface active agent – sodium chloride of sulfonated derived naphthalene 1–20; fumed silica 5–15; water – the rest. Dispersion can additionally contain ethylene glycol as antifreeze. Dispersion is steady in storage, it is soluble in water, provides increased strength of construction materials. Invention «Building Structures Reinforcement Composition (RU 2493337» can beused in construction to reinforce concrete, brick and masonry structures. Composition contains glass or basalt roving taken in quantity 90÷100 parts by weight, soaked in polymer binder based on epoxy taken in quantity 0,001÷1,5 parts by weight. This invention provides high resistance to operational load.

  11. Experience Gained From the Construction, Test and Operation of the Large 4-T CMS Coil

    CERN Document Server

    Hervé, A; Curé, B; Fabbricatore, P; Gaddi, A; Kircher, F; Sgobba, S

    2008-01-01

    The 4-T, 6-m free bore CMS solenoid has been successfully tested, operated and mapped at CERN during the autumn of 2006; R&D studies started in 1993 and the construction proper in 1997. The main parameters of this 100 MUS$ project (including yoke) were then considered beyond what was thought possible, as the total stored magnetic energy reaches 2.6 GJ for a specific magnetic energy density exceeding 11 kJ/kg of cold mass. During this period, the international design and construction team had to make several important technical choices, in particular mechanical, to maximize the chances of reaching the nominal induction of 4 Tesla. The paper will review these choices in the light of what is presently known and examine if better solutions would be possible today for constructing a new large high-field thin solenoid for a future detector magnet.

  12. Case study of restaurant successfully designed, constructed, and operated for excellent dining acoustics

    Science.gov (United States)

    Bollard, Paul; Des Jardins, Stephen

    2005-09-01

    Prior to the construction of La Provence Restaurant in Roseville, California in 2004, the owner, Stephen Des Jardins, traveled with his cook, architect, and engineer to the Provence Region of France to study the cuisine, architecture, and acoustics of the local restaurants. This information was incorporated into the design, construction, and operation of his restaurant, with acoustical design assistance provided by the author, Paul Bollard. The result of the owner's painstaking attention to detail is a restaurant which has received very positive reviews for its architecture, quality of food, service, and acoustic ambience. This paper documents the measures included in the construction of the restaurant to ensure that the building acoustics enhance the dining experience, rather than detract from it. Photographs of acoustic treatments are included, as are reverberation time (RT60) test results and ambient noise level measurement results.

  13. Construction and operation of biogas plants. Bau und Betrieb von Biogasanlagen

    Energy Technology Data Exchange (ETDEWEB)

    Koenig, F. von

    1985-01-01

    Biogas utilisation in agriculture has increased considerably as a consequence of the energy crisis. So far, energy production was the most important aspect, and the high-quality natural fertilizer offered by the fermentation residues was commonly neglected. This fertilizer is an effective substitute for commercial fertilizers and thus contributes to the reduction of environmental pollution. The book discusses the chemical and biological mechanisms, the criteria of selection for plants and materials, optimum gas production techniques, uses of the product gas, and the advantages and properties of the biofertilizer produced. Planning procedures, design, construction, function and performance of several biogas production plants now in operation are described. Hints are given for do-it-yourself construction, as are cost-benefit calculations and decision aids for construction.

  14. [Construction and operation status of management system of laboratories of schistosomiasis control institutions in Hubei Province].

    Science.gov (United States)

    Zhao-Hui, Zheng; Jun, Qin; Li, Chen; Hong, Zhu; Li, Tang; Zu-Wu, Tu; Ming-Xing, Zeng; Qian, Sun; Shun-Xiang, Cai

    2016-10-09

    To analyze the construction and operation status of management system of laboratories of schistosomiasis control institutions in Hubei Province, so as to provide the reference for the standardized detection and management of schistosomiasis laboratories. According to the laboratory standard of schistosomiasis at provincial, municipal and county levels, the management system construction and operation status of 60 schistosomiasis control institutions was assessed by the acceptance examination method from 2013 to 2015. The management system was already occupied over all the laboratories of schistosomiasis control institutions and was officially running. There were 588 non-conformities and the inconsistency rate was 19.60%. The non-conformity rate of the management system of laboratory quality control was 38.10% (224 cases) and the non-conformity rate of requirements of instrument and equipment was 23.81% (140 cases). The management system has played an important role in the standardized management of schistosomiasis laboratories.

  15. A team leadership approach to managing the transition from construction to operations for an environmental project

    International Nuclear Information System (INIS)

    Kelly, J.W.

    1994-06-01

    This presentation describes a team approach, at the totalproject level that focused team members with common objectives, for the transition to start-up and operation of the project. The Integrated Management Team (IMT) approach has been successful for this US Department of Energy (DOE) environmental restoration project at the Hanford Site in Richland, Washington. The $53.8-million project will collect, treat, and dispose of low-level mixed waste water discharges from the Hanford Site. Construction is scheduled for completion in September 1994 and facility start-up in June 1995. The project challenge is for leadership that is committed to the transition from construction to operation of the environmental restoration project

  16. Three integrated photovoltaic/sound barrier power plants. Construction and operational experience

    International Nuclear Information System (INIS)

    Nordmann, T.; Froelich, A.; Clavadetscher, L.

    2002-01-01

    After an international ideas competition by TNC Switzerland and Germany in 1996, six companies where given the opportunity to construct a prototype of their newly developed integrated PV-sound barrier concepts. The main goal was to develop highly integrated concepts, allowing the reduction of PV sound barrier systems costs, as well as the demonstration of specific concepts for different noise situations. This project is strongly correlated with a German project. Three of the concepts of the competition are demonstrated along a highway near Munich, constructed in 1997. The three Swiss installations had to be constructed at different locations, reflecting three typical situations for sound barriers. The first Swiss installation was the world first Bi-facial PV-sound barrier. It was built on a highway bridge at Wallisellen-Aubrugg in 1997. The operational experience of the installation is positive. But due to the different efficiencies of the two cell sides, its specific yield lies somewhat behind a conventional PV installation. The second Swiss plant was finished in autumn 1998. The 'zig-zag' construction is situated along the railway line at Wallisellen in a densely inhabited area with some local shadowing. Its performance and its specific yield is comparatively low due to a combination of several reasons (geometry of the concept, inverter, high module temperature, local shadows). The third installation was constructed along the motor way A1 at Bruettisellen in 1999. Its vertical panels are equipped with amorphous modules. The report show, that the performance of the system is reasonable, but the mechanical construction has to be improved. A small trial field with cells directly laminated onto the steel panel, also installed at Bruettisellen, could be the key development for this concept. This final report includes the evaluation and comparison of the monitored data in the past 24 months of operation. (author)

  17. Using game technologies to improve the safety of construction plant operations.

    Science.gov (United States)

    Guo, Hongling; Li, Heng; Chan, Greg; Skitmore, Martin

    2012-09-01

    Many accidents occur world-wide in the use of construction plant and equipment, and safety training is considered by many to be one of the best approaches to their prevention. However, current safety training methods/tools are unable to provide trainees with the hands-on practice needed. Game technology-based safety training platforms have the potential to overcome this problem in a virtual environment. One such platform is described in this paper - its characteristics are analysed and its possible contribution to safety training identified. This is developed and tested by means of a case study involving three major pieces of construction plant, which successfully demonstrates that the platform can improve the process and performance of the safety training involved in their operation. This research not only presents a new and useful solution to the safety training of construction operations, but illustrates the potential use of advanced technologies in solving construction industry problems in general. Copyright © 2011 Elsevier Ltd. All rights reserved.

  18. Legal preconditions for the construction and operation of district gas mains

    Energy Technology Data Exchange (ETDEWEB)

    Joachim, H

    1977-06-01

    The course of procedure in connection with the construction of district gas mains is outlined. This includes acquisition of main rights under private law and expropriation law, special problems such as peculiarities of land or landscape, road crossings, facilities of the Federal railway, agriculture etc., operational problems such as protection zones, building territories within the area of the main layout, drainage effects, high-pressure pipes, etc.

  19. Black Fox Station, Units 1 and 2. Application for construction permits and operating licenses

    International Nuclear Information System (INIS)

    1975-01-01

    An application to construct and operate Black Fox Station, Units 1 and 2, is presented. The two BWR type reactors will have a rated core thermal power of 3579 MW(t) and a net electrical power of approximately 1150 MW(e). The facility will be located in Inola Township, 23 miles east of Tulsa on the east side of the Verdigris River in Rogers County, Oklahoma

  20. Subsurface flow constructed wetlands for the treatment of wastewater from different sources. Design and operation

    OpenAIRE

    Torrens Armengol, Antonina

    2016-01-01

    The aim of the thesis is to examine the viability of the subsurface constructed wetlands for the treatment of wastewater derived from three different sources (treatment ponds, pig farms and car wash facilities), and to evaluate the influence of design (size, type and depth of media, presence of Phragmites australis) and operational parameters (hydraulic load, dosing and feeding modes) on treatment efficiency and hydraulic behavior. Several studies were done in the framework of different ...

  1. Spaceborne construction and operations planning - Decision rules for selecting EVA, telerobot, and combined work-systems

    Science.gov (United States)

    Smith, Jeffrey H.

    1992-01-01

    An approach is presented for selecting an appropriate work-system for performing construction and operations tasks by humans and telerobots. The decision to use extravehicular activity (EVA) performed by astronauts, extravehicular robotics (EVR), or a combination of EVA and EVR is determined by the ratio of the marginal costs of EVA, EVR, and IVA. The approach proposed here is useful for examining cost trade-offs between tasks and performing trade studies of task improvement techniques (human or telerobotic).

  2. Design, construction, and operations experience with the SWSA 6 [Solid Waste Storage Area] Tumulus Disposal Demonstration

    International Nuclear Information System (INIS)

    Van Hoesen, S.D.; Van Cleve, J.E.; Wylie, A.N.; Williams, L.C.; Bolinsky, J.

    1988-01-01

    Efforts are underway at the Department of Energy facilities in Oak Ridge to improve the performance of radioactive waste disposal facilities. An engineered disposal concept demonstration involving placement of concrete encased waste on a monitored concrete pad with an earthen cover is being conducted. The design, construction, and operations experience with this project, the SWSA 6 Tumulus Disposal Demonstration, is described. 1 fig., 1 tab

  3. Assessing the effect of nuclear power installation construction and operation on the socio-economic sphere

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    A demographic analysis is made of the area within 25 km from the Dukovany nuclear power plant. The problem is discussed of sources and requirements for manpower for the construction and operation of the power plant. It was found that the capacity of creches and nursery schools for children of power plant employees is inadequate, as are health care facilities for personnel. (E.S.)

  4. Commission on Legal Matters

    CERN Multimedia

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  5. Does modern helicopter construction reduce noise exposure in helicopter rescue operations?

    Science.gov (United States)

    Küpper, Thomas; Jansing, Paul; Schöffl, Volker; van Der Giet, Simone

    2013-01-01

    During helicopter rescue operations the medical personnel are at high risk for hearing damage by noise exposure. There are two important factors to be taken into account: first, the extreme variability, with some days involving no exposure but other days with extreme exposure; second, the extreme noise levels during work outside the helicopter, e.g. during winch operations. The benefit of modern, less noisier constructions and the consequences for noise protection are still unknown. We estimated the noise exposure of the personnel for different helicopter types used during rescue operations in the Alps and in other regions of the world with special regard to the advanced types like Eurocopter EC 135 to compare the benefit of modern constructions for noise protection with earlier ones. The rescue operations over 1 year of four rescue bases in the Alps (Raron and Zermatt in Switzerland; Landeck and Innsbruck in Austria, n = 2731) were analyzed for duration of rescue operations (noise exposure). Noise levels were measured during rescue operations at defined points inside and outside the different aircraft. The setting is according to the European standard (Richtlinie 2003/10/EG Amtsblatt) and to Class 1 DIN/IEC 651. With both data sets the equivalent noise level L(eq8h) was calculated. For comparison it was assumed that all rescue operations were performed with a specific type of helicopter. Then model calculations for noise exposure by different helicopter types, such as Alouette IIIb, Alouette II 'Lama', Ecureuil AS350, Bell UH1D, Eurocopter EC135, and others were performed. Depending on modern technologies the situation for the personnel has been improved significantly. Nevertheless noise prevention, which includes noise intermissions in spare time, is essential. Medical checks of the crews by occupational medicine (e.g. 'G20' in Germany) are still mandatory.

  6. Commission 1

    African Journals Online (AJOL)

    state" to provide the Commission with information on the measures that they have ...... policies and identify the gaps in ensuring the full realisation of socio- economic .... Boulle L, Harris Band Hoexter C Constitutional and Administrative Law.

  7. Joint Commission

    Science.gov (United States)

    ... for the latest publication of The Joint Commission Journal on Quality and Patient Safety (JQPS). . How We Work Process improvement program breeds quality culture, empowers staff An article in Quality Progress, June ...

  8. Final environmental impact statement, construction and operation of the Spallation Neutron Source Facility. Summary

    International Nuclear Information System (INIS)

    1999-04-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed, spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulator ring and a second target. This document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this FEIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. The No-Action Alternative describes the expected condition of the environment if no action were taken. Four siting alternatives for the Spallation Neutron Source are evaluated: Oak Ridge National Laboratory, Oak Ridge, TN, (preferred alternative); Argonne National Laboratory, Argonne, IL; Brookhaven National Laboratory, Upton, NY; and Los Alamos National Laboratory, Los Alamos, NM

  9. Final environmental impact statement, construction and operation of the Spallation Neutron Source. Volume 1

    International Nuclear Information System (INIS)

    1999-04-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed, spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulator ring and a second target. This document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this FEIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. The No-Action Alternative describes the expected condition of the environment if no action were taken. Four siting alternatives for the Spallation Neutron Source are evaluated: Oak Ridge National Laboratory, Oak Ridge, TN, (preferred alternative); Argonne National Laboratory, Argonne, IL; Brookhaven National Laboratory, Upton, NY; and Los Alamos National Laboratory, Los Alamos, NM

  10. Operational Work System Design and Staff Performance in the Nigerian Construction Industry

    Directory of Open Access Journals (Sweden)

    Emmanuel Ejikeme Isichei

    2017-03-01

    Full Text Available Objective: The study investigated the impact of operational work system design on staff performance in selected construction firms in Nigeria. Research Design & Methods: The study used primary data gathered with the use of a 5-point Likert scale questionnaire format administered to 138 respondents. A hypothesis was postulated to test the significance of the research problem. Data analysis was carried out using correlation and multiple regression analysis which proved the significance of the alternative hypothesis as a result of testing the hypothesis. Findings: The findings show that there is a significant relationship between operational work system design and staff performance. The study concludes that operational job design can be advanced as a motivation tool, which is non-monetary in nature, to improve staff performance. Implications & Recommendations: A key drive to improve performance is the satisfaction of staff coupled with an outstanding operational job design which takes into consideration the total physical and mental well-being of staff and its interaction with other organisational factors. The study recommends, among others, that there should be active participation of staff in the design of work in the organisation. Contribution & Value Added: The study provides an empirical approach to enhancing performance in the construction industry and thereby developing an indigenous firm to compete favourably on a growing market.

  11. Construction and operation of the Spallation Neutron Source: Draft environmental impact statement. Volume 2

    International Nuclear Information System (INIS)

    1998-12-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulation ring and a second target. Volume 1 of this document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this EIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. This volume contains the following appendices: (A) SNS accident source terms for EIS input; (B) Reports on the selection of alternative sites for the SNS; (C) Letters of consultation on protected species and cultural resources; (D) Ecological resource survey reports and summaries; (E) Descriptions of ORNL research projects in the Walker Branch Watershed; (F) Atmospheric dispersion and dose calculations for normal and accident conditions; (G) Projected air quality modeling effects at NOAA's Walker Branch Monitoring Tower

  12. Nuclear power plants in Europe 1995. Report about operation, construction, and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    Report about Operation, Construction, and Planning in 18 European Countries Eighteen European countries operate and build, respectively, nuclear power plants in 1995. The ''Nuclear Power Plants in Europe 1995'' atw report singles out the main events and lines of development. As per August 1995, 214 (1994: 215) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 177,010 (176,322) MWe installed gross capacity are in operation in seventeen countries, and 26 (30) units with 24,786 (28,086) MWe are under construction in seven countries. This adds up to a total of 240 (245) nuclear generating units with an aggregate 201,796 (204,408) MWe. In the nuclear power plants in Europe, some 1048 TWh of nuclear power was converted into electric power in 1994; 792 TWh of this aggregate was converted in 137 units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 36%. Lithuania, with 77%, has the highest share of nuclear power in Europe, followed by France with 75% and Belgium with 56%. The lowest percentage, only 5%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power plants are operated, such as Italy or Austria. (orig.) [de

  13. Law no. 10.308 of 20th November, 2001 on radioactive waste repositories siting, construction, licensing, operation, inspection, costs, indemnity, civil liability and guarantees concerning to the radioactive wastes repositories and other provisions

    International Nuclear Information System (INIS)

    2001-01-01

    This Act was published on November 20, 2001 and set forth regulations on the final disposal of radioactive wastes produced in Brazil, including siting, construction, licensing, operation, inspection, costs, indemnities, civil liability and guarantees concerning to the radioactive wastes repositories. This act allows for installation and operation of initial, intermediary and final repositories in accordance with the criteria established by the Brazilian Nuclear Energy National Commission - CNEN. The person or organization granted with CNEN authorization for operation of the initial repositories shall be liable for personal, patrimony and environmental radiological damages. The civil liability of CNEN is concerned to the radioactive waste intermediary and final disposals and transportation

  14. 77 FR 30588 - R.J. Corman Railroad Company/Pennsylvania Lines Inc.-Construction and Operation Exemption-In...

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF TRANSPORTATION Surface Transportation Board [Docket No. FD 35116] R.J. Corman Railroad Company/Pennsylvania Lines Inc.-- Construction and Operation Exemption--In Clearfield County, PA.... 10901 for R.J. Corman Railroad Company/Pennsylvania Lines Inc. (RJCP) to construct and operate 10.8...

  15. Guidebook on design, construction and operation of pilot plants for uranium ore processing

    International Nuclear Information System (INIS)

    1990-01-01

    The design, construction and operation of a pilot plant are often important stages in the development of a project for the production of uranium concentrates. Since building and operating a pilot plant is very costly and may not always be required, it is important that such a plant be built only after several prerequisites have been met. The main purpose of this guidebook is to discuss the objectives of a pilot plant and its proper role in the overall project. Given the wide range of conditions under which a pilot plant may be designed and operated, it is not possible to provide specific details. Instead, this book discusses the rationale for a pilot plant and provides guidelines with suggested solutions for a variety of problems that may be encountered. This guidebook is part of a series of Technical Reports on uranium ore processing being prepared by the IAEA's Division of Nuclear Fuel Cycle and Waste Management. 42 refs, 7 figs, 3 tabs

  16. Study on the construction and its operating characteristics of Marx high voltage pulse generator

    International Nuclear Information System (INIS)

    Chung, W.K.; Yook, C.C.

    1984-01-01

    This study is to investigate the operating characteristics of a Marx high voltage pulse generator, which is designed and fabricated for the purpose of constructing a linear theta-pinch plasma generating facility. The Marx generator consists of a 2 kJ capacitor bank of maximum output voltage of 200kV, a set of main spark switch, a triggring system, and high voltage charging power supply. The experimental results show that the operating characteristics of the generator can be controlled through varying nitrogen pressure as a filling gas. The output pulse of the generator is achieved close to the estimated voltage with the rise time of 3*m seconds. The stability of the generator is also very satisfactory within operating range of main spark switch. (Author)

  17. DESY: HERA commissioning

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The commissioning of the world's first electron-proton collider - the 6.3 kilometre HERA ring at the DESY Laboratory in Hamburg - last year was the result of more than a decade of careful planning, design and construction

  18. Blue Ribbon Commission, Yucca Mountain Closure, Court Actions - Future of Decommissioned Reactors, Operating Reactors and Nuclear Power - 13249

    International Nuclear Information System (INIS)

    Devgun, Jas S.

    2013-01-01

    Issues related to back-end of the nuclear fuel cycle continue to be difficult for the commercial nuclear power industry and for the decision makers at the national and international level. In the US, the 1982 NWPA required DOE to develop geological repositories for SNF and HLW but in spite of extensive site characterization efforts and over ten billion dollars spent, a repository opening is nowhere in sight. There has been constant litigation against the DOE by the nuclear utilities for breach of the 'standard contract' they signed with the DOE under the NWPA. The SNF inventory continues to rise both in the US and globally and the nuclear industry has turned to dry storage facilities at reactor locations. In US, the Blue Ribbon Commission on America's Nuclear Future issued its report in January 2012 and among other items, it recommends a new, consent-based approach to siting of facilities, prompt efforts to develop one or more geologic disposal facilities, and prompt efforts to develop one or more consolidated storage facilities. In addition, the March 2011 Fukushima Daiichi accident had a severe impact on the future growth of nuclear power. The nuclear industry is focusing on mitigation strategies for beyond design basis events and in the US, the industry is in the process of implementing the recommendations from NRC's Near Term Task Force. (authors)

  19. A study on the operator's errors of commission (EOC) in accident scenarios of nuclear power plants: methodology development and application

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jae Whan; Jung, Won Dea; Park, Jin Kyun; Kang, Da Il

    2003-04-01

    As the concern on the operator's inappropriate interventions, the so-called Errors Of Commission (EOCs), that can exacerbate the plant safety has been raised, much of interest in the identification and analysis of EOC events from the risk assessment perspective has been increased. Also, one of the items in need of improvement for the conventional PSA and HRA that consider only the system-demanding human actions is the inclusion of the operator's EOC events into the PSA model. In this study, we propose a methodology for identifying and analysing human errors of commission that might be occurring from the failures in situation assessment and decision making during accident progressions given an initiating event. In order to achieve this goal, the following research items have been performed: Firstly, we analysed the error causes or situations contributed to the occurrence of EOCs in several incidents/accidents of nuclear power plants. Secondly, limitations of the advanced HRAs in treating EOCs were reviewed, and a requirement for a new methodology for analysing EOCs was established. Thirdly, based on these accomplishments a methodology for identifying and analysing EOC events inducible from the failures in situation assessment and decision making was proposed and applied to all the accident sequences of YGN 3 and 4 NPP which resulted in the identification of about 10 EOC situations.

  20. Problems of economic assessment of social impacts of construction anO operation of nuctear power plant in the area

    International Nuclear Information System (INIS)

    Koudelka, F.

    1984-01-01

    The impacts of nuclear power plant construction and operation are divided into economic, demographic, on town planning, historic, etc. Further subdivision is performed according to the intensity of construction impacts, to the sequence and quality of impact and to the effects in space and time. The area of environmental impacts is classified into the protective area and the areas of immediate, limited and broad impact. The methods of the evaluation of nuclear power plant construction and operation impacts are discussed. (E.S.)

  1. Authorization procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1974-12-01

    For Belgium and Luxembourg, the authorization procedure varies according to the class in which the installation concerned falls (assigned according to the degree of hazard involved classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of class I and II installations. With respect to Germany also, two such separate authorizations are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the basic nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of classified installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of classified installations exist in the United Kingdom. Moreover, there is only one single authorization (the site licence), which is successively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  2. Environmental assessment report: Nuclear Test Technology Complex. [Construction and operation of proposed facility

    Energy Technology Data Exchange (ETDEWEB)

    Tonnessen, K.; Tewes, H.A.

    1982-08-01

    The US Department of Energy (USDOE) is planning to construct and operate a structure, designated the Nuclear Test Technology Complex (NTTC), on a site located west of and adjacent to the Lawrence Livermore National Laboratory. The NTTC is designed to house 350 nuclear test program personnel, and will accommodate the needs of the entire staff of the continuing Nuclear Test Program (NTP). The project has three phases: land acquisition, facility construction and facility operation. The purpose of this environmental assessment report is to describe the activities associated with the three phases of the NTTC project and to evaluate potential environmental disruptions. The project site is located in a rural area of southeastern Alameda County, California, where the primary land use is agriculture; however, the County has zoned the area for industrial development. The environmental impacts of the project include surface disturbance, high noise levels, possible increases in site erosion, and decreased air quality. These impacts will occur primarily during the construction phase of the NTTC project and can be mitigated in part by measures proposed in this report.

  3. Licensing procedure for the construction and operation of nuclear installations within the EEC member states

    International Nuclear Information System (INIS)

    Didier, J.M.

    1976-08-01

    For Belgium and Luxembourg, the authorization procedure varies according to the Class in which the installation concerned falls (assigned according to the degree of hazard involved: Classes I, II or III). Moreover, separate authorizations are needed, one for construction and another for operation of Class I and II installations. With respect to Germany also, two such separate authorization are needed, but there is no specific procedure relating to the potential extent of hazard involved in the installation concerned. In France, the 'basic' nuclear installations are subject to a special procedure. Furthermore, the construction and operation of these installations are also subject to two separate authorizations. While the latter two authorizations are required in Italy for the main nuclear installations, no system of 'classified' installations exists according to extent of hazard involved. Similar legislation is applicable in the Netherlands. Neither does such a system of 'classified' installations exist in the United Kingdom. Moreover, there is only one single authorization (the 'site licence'), which is succesively adapted during construction. On the other hand, in Denmark and Ireland, no detailed legislation has been developed on the subject

  4. Conception, construction, and taking into operation of a pre-accelerator system at ELSA

    International Nuclear Information System (INIS)

    Klarner, Fabian

    2011-01-01

    In order to enhance the operating capabilities of the Bonn University Accelerator Facility ELSA by a single pulse mode, a new injector was designed, built up and successfully commissioned. In addition, the new injector was designed to provide an unpolarized electron beam with increased current to the external hadron physics experiments. For this purpose, the injector will produce an 1-3 microseconds long pulse of 900 mA beam current or a single electron bunch with 1.5 A pulse current. For single bunch operation, a 1.5 ns long pulse is produced by a thermal electron source, then compressed and pre-accelerated by a subsequent resonator and a four-cell travelling wave buncher. After acceleration of the electrons in the main linac, the natural broadening of the energy distribution in the particle ensemble due to the acceleration process will be reduced by an energy compressor system. By the succeeding optical elements in the transfer beamline, the beam is guided to the synchrotron, taking into account the requirements for injection into the synchrotron including its acceptance. Finally, the first beam of the new LINAC1 section was successfully used to irradiate ammonia for preparation as polarized target material for the COMPASS experiment and to irradiate detector components of the DEPFET project. (orig.)

  5. German battlecruisers of world war one their design, construction and operations

    CERN Document Server

    Staff, Gary

    2015-01-01

    This is the most comprehensive study yet in the English language of the German Imperial Navy's battlecruisers that served in the First World War. Known as Panzerkreuzer, literally 'armoured cruiser', the eight ships of the class were to be involved in several early North Sea skirmishes before the great pitched battle of Jutland where they inflicted devastating damage on the Royal Navy's battlecruiser fleet.
In this new book the author details their design and construction, and traces the full service history of each ship, recounting their actions, largely from first-hand German sources and official documents, many previously unpublished in English. Detailed line drawings and maps augment the text throughout, as do a wealth of contemporary photos that depict the vessels at sea as well as in dock, where details of damage sustained in action and many aspects of their design can be viewed in close up. A superb series of full-colour, specially-commissioned computer graphics show full length profiles and top-down...

  6. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory

    International Nuclear Information System (INIS)

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL's existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required

  7. Procedure guide of design, construction of prototypes, calibration and sure operation of nucleonic control systems

    International Nuclear Information System (INIS)

    Banados Perez, H.; Griffith Martinez, J.; Desdin Garcia, L.F.; Rodriguez Cardona, R.L.; Molina, G.; Sebastian Calvo, C.

    1999-01-01

    This Guide was elaborated in the mark of the project RLA/8/024 ARCAL XLII 'Industrial Applications of the Tracer Technology and Nucleonic Control Systems'. Its objective is to establish the approaches for the design, the construction, the selection and the procedures for the sure operation of the Nucleonic Control Systems (NCS) in the industry. The NCS is used to control processes to high speeds, materials with extreme conditions or with noxious chemical properties, susceptible materials of being damaged by contact and packed products. In this document is defined the scope of the procedure. The SCN are classified according to: type of radiations, the mobility of the components, the degree of the beams collimation; and in function of the security. The design and construction criteria of the nuclear meters and of the systems of control nucleonic are exposed

  8. Construction and operation of replacement hazardous waste handling facility at Lawrence Berkeley Laboratory. Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-09-01

    The US Department of Energy (DOE) has prepared an environmental assessment (EA), DOE/EA-0423, for the construction and operation of a replacement hazardous waste handling facility (HWHF) and decontamination of the existing HWHF at Lawrence Berkeley Laboratory (LBL), Berkeley, California. The proposed facility would replace several older buildings and cargo containers currently being used for waste handling activities and consolidate the LBL`s existing waste handling activities in one location. The nature of the waste handling activities and the waste volume and characteristics would not change as a result of construction of the new facility. Based on the analysis in the EA, DOE has determined that the proposed action would not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act (NEPA) of 1969, 42 USC. 4321 et seq. Therefore, an environmental impact statement is not required.

  9. Evaluation of the energy required for constructing and operating a fusion power plant

    International Nuclear Information System (INIS)

    Buende, R.

    1982-09-01

    The energy required for constructing and operating a tokamak fusion power plant is appraised with respect to the energy output during the lifetime of the plant. A harvesting factor is deduced as a relevant figure of energetic merit and is used for a comparison between fusion, fission, and coal-fired power plants. Because fusion power plants involve considerable uncertainties the comparison is supplemented by a sensitivity analysis. In comparison with Light Water Reactor plants fusion power plants appear to be rather favourable in this respect. The energy required for providing the fuel is relatively low for fusion plants, thus overcompensating the considerable higher amount of energy necessary for constructing the fusion power plant. (orig.)

  10. Information management system for design, construction and operation of nuclear power plants

    International Nuclear Information System (INIS)

    Bolch, M.C.; Jones, C.R.

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software

  11. Construction and operation of an improved radiation calibration facility at Brookhaven National Laboratory. Environmental assessment

    International Nuclear Information System (INIS)

    1994-10-01

    Calibration of instruments used to detect and measure ionizing radiation has been conducted over the last 20 years at Brookhaven National Laboratory's (BNL) Radiation Calibration Facility, Building 348. Growth of research facilities, projects in progress, and more stringent Department of Energy (DOE) orders which involve exposure to nuclear radiation have placed substantial burdens on the existing radiation calibration facility. The facility currently does not meet the requirements of DOE Order 5480.4 or American National Standards Institute (ANSI) N323-1978, which establish calibration methods for portable radiation protection instruments used in the detection and measurement of levels of ionizing radiation fields or levels of radioactive surface contaminations. Failure to comply with this standard could mean instrumentation is not being calibrated to necessary levels of sensitivity. The Laboratory has also recently obtained a new neutron source and gamma beam irradiator which can not be made operational at existing facilities because of geometry and shielding inadequacies. These sources are needed to perform routine periodic calibrations of radiation detecting instruments used by scientific and technical personnel and to meet BNL's substantial increase in demand for radiation monitoring capabilities. To place these new sources into operation, it is proposed to construct an addition to the existing radiation calibration facility that would house all calibration sources and bring BNL calibration activities into compliance with DOE and ANSI standards. The purpose of this assessment is to identify potential significant environmental impacts associated with the construction and operation of an improved radiation calibration facility at BNL

  12. Information management system for design, construction and operation of nuclear power plants

    Energy Technology Data Exchange (ETDEWEB)

    Bolch, M.C. (Duke Power Co. (US)); Jones, C.R. (S. Levy Inc. (US))

    1990-01-01

    This paper describes the principal requirements and features of a computerized information management system (IMS) believed to be a necessary part of the program to design, build and operate the next generation of nuclear power plants in the United States. This way a result of extensive review and input from an industry group studying future nuclear power plant construction improvements. The needs of the power plant constructor, owner and operator for such a computerized technical data base are described in terms of applications and scope and timing of turnover of the IMS by the plant designer. The applications cover the full life cycle of the plant including project control, construction activities, quality control, maintenance and operation. The scope of the IMS is also described in terms of the technical data to be included, hardware and software capabilities and training. The responsibilities of the plant designer for developing the IMS and generating the technical data base is defined as part of the plant process. The requirements to be met include a comprehensive plant data model and computer system hardware and software.

  13. Project Guarantee 1985. Repository for low- and intermediate-level radioactive waste: construction and operation

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    A constructional engineering project study aimed at clarification of the feasibility of a repository for low- and intermediate-level radioactive waste (type B repository) has been carried out; the study is based on a model data-set derived from the geological, rock mechanical and topographical characterictics of one of Nagra's planned exploration areas. Final storage is effected in subterranean rock caverns accessed by horizontal tunnel. The reception area also is sited below the surface. Storage is conceived in such a way that, after closure of the repository, maintenance and supervision can be dispensed with and a guarantee of high long-term safety can nevertheless be provided. The envisaged repository consists of an entry tunnel for road vehicles and a reception area with a series of caverns for receiving waste, for additional technical facilities and for the production of the concrete back-fill material. The connecting tunnel is serviced by a tunnel railway and the actual repository area consists of several storage caverns. The repository is intended to accomodate a total of 200'000 m3 of solidified low- and intermediate-level waste. Valanginian marl is assumed as the host rock, although it would also be basically possible to house the proposed installations in other host rocks. The excavated material will total around 1'000'000 m3. The construction time for the whole installation is estimated as about 7 years and a working team of around 30 people will be required for the estimated 60-year operational duration. The project described in the present report justifies the conclusion that construction of a repository for low-and intermediate-level radioactive waste is feasible with present-day technology. This conclusion takes into consideration quantitative and operational constraints as well as geological and hydrogeological data relevant to constructional engineering. The latter are derived from a model data-set based on a specific locality

  14. Pre-operative simulation of periacetabular osteotomy via a three-dimensional model constructed from salt

    Directory of Open Access Journals (Sweden)

    Fukushima Kensuke

    2017-01-01

    Full Text Available Introduction: Periacetabular osteotomy (PAO is an effective joint-preserving procedure for young adults with developmental dysplasia of the hip. Although PAO provides excellent radiographic and clinical results, it is a technically demanding procedure with a distinct learning curve that requires careful 3D planning and, above all, has a number of potential complications. We therefore developed a pre-operative simulation method for PAO via creation of a new full-scale model. Methods: The model was prepared from the patient’s Digital Imaging and Communications in Medicine (DICOM formatted data from computed tomography (CT, for construction and assembly using 3D printing technology. A major feature of our model is that it is constructed from salt. In contrast to conventional models, our model provides a more accurate representation, at a lower manufacturing cost, and requires a shorter production time. Furthermore, our model realized simulated operation normally with using a chisel and drill without easy breakage or fissure. We were able to easily simulate the line of osteotomy and confirm acetabular version and coverage after moving to the osteotomized fragment. Additionally, this model allowed a dynamic assessment that avoided anterior impingement following the osteotomy. Results: Our models clearly reflected the anatomical shape of the patient’s hip. Our models allowed for surgical simulation, making realistic use of the chisel and drill. Our method of pre-operative simulation for PAO allowed for the assessment of accurate osteotomy line, determination of the position of the osteotomized fragment, and prevented anterior impingement after the operation. Conclusion: Our method of pre-operative simulation might improve the safety, accuracy, and results of PAO.

  15. Construction and operation of the Spallation Neutron Source: Draft environmental impact statement. Volume 1

    International Nuclear Information System (INIS)

    1998-12-01

    DOE proposes to construct and operate a state-of-the-art, short-pulsed spallation neutron source comprised of an ion source, a linear accelerator, a proton accumulator ring, and an experiment building containing a liquid mercury target and a suite of neutron scattering instrumentation. The proposed Spallation Neutron Source would be designed to operate at a proton beam power of 1 megawatt. The design would accommodate future upgrades to a peak operating power of 4 megawatts. These upgrades may include construction of a second proton accumulation ring and a second target. The US needs a high-flux, short-pulsed neutron source to provide the scientific and industrial research communities with a much more intense source of pulsed neutrons for neutron scattering research than is currently available, and to assure the availability of a state-of-the-art facility in the decades ahead. This next-generation neutron source would create new scientific and engineering opportunities. In addition, it would help replace the neutron science capacity that will be lost by the eventual shutdown of existing sources as they reach the end of their useful operating lives in the first half of the next century. This document analyzes the potential environmental impacts from the proposed action and the alternatives. The analysis assumes a facility operating at a power of 1 MW and 4 MW over the life of the facility. The two primary alternatives analyzed in this EIS are: the proposed action (to proceed with building the Spallation Neutron Source) and the No-Action Alternative. The No-Action Alternative describes the expected condition of the environment if no action were taken. Four siting alternatives for the Spallation Neutron Source are evaluated: Oak Ridge National Laboratory, Oak Ridge, TN, (preferred alternative); Argonne National Laboratory, Argonne, IL (US); Brookhaven National Laboratory, Upton, NY; and Los Alamos National Laboratory, Los Alamos, NM

  16. A review on the sustainability of constructed wetlands for wastewater treatment: Design and operation.

    Science.gov (United States)

    Wu, Haiming; Zhang, Jian; Ngo, Huu Hao; Guo, Wenshan; Hu, Zhen; Liang, Shuang; Fan, Jinlin; Liu, Hai

    2015-01-01

    Constructed wetlands (CWs) have been used as a green technology to treat various wastewaters for several decades. CWs offer a land-intensive, low-energy, and less-operational-requirements alternative to conventional treatment systems, especially for small communities and remote locations. However, the sustainable operation and successful application of these systems remains a challenge. Hence, this paper aims to provide and inspire sustainable solutions for the performance and application of CWs by giving a comprehensive review of CWs' application and the recent development on their sustainable design and operation for wastewater treatment. Firstly, a brief summary on the definition, classification and application of current CWs was presented. The design parameters and operational conditions of CWs including plant species, substrate types, water depth, hydraulic load, hydraulic retention time and feeding mode related to the sustainable operation for wastewater treatments were then discussed. Lastly, future research on improving the stability and sustainability of CWs were highlighted. Copyright © 2014 Elsevier Ltd. All rights reserved.

  17. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    International Nuclear Information System (INIS)

    Zeitoun, A.

    1994-08-01

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF 6 , using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility

  18. Final Environmental Impact Statement for the construction and operation of Claiborne Enrichment Center, Homer, Louisiana (Docket No. 70-3-70). Volume 2, Public comments and NRC response

    Energy Technology Data Exchange (ETDEWEB)

    Zeitoun, A. [Science Applications International Corp., Germantown, MD (United States)

    1994-08-01

    The Final Environmental Impact Statement (FEIS) (Volume 1), was prepared by the Nuclear Regulatory Commission (NRC) in accordance with regulation 10 CFR Part 51, which implements the National Environmental Policy Act (NEPA), to assess the potential environmental impacts for licensing the construction and operation of a proposed gaseous centrifuge enrichment facility to be built in Claiborne Parish, Louisiana by Louisiana Energy Services, L.P. (LES). The proposed facility would have a production capacity of about 866 metric tons annually of up to 5 weight percent enriched UF{sub 6}, using a proven centrifuge technology. Included in the assessment are co on, both normal operations and potential accidents (internal and external events), and the eventual decontamination and decommissioning of the site. In order to help assure that releases from the operation of the facility and potential impacts on the public are as low as reasonably achievable, an environmental monitoring program was developed by LES to detect significant changes in the background levels of uranium around the site. Other issues addressed include the purpose and need for the facility, the alternatives to the proposed action, potential disposition of the tails, the site selection process, and environmental justice. The NRC staff concludes that the facility can be constructed and operated with small and acceptable impacts on the public and the environment, and proposes to issue a license to the applicant, Louisiana Energy Services, to authorize construction and operation of the proposed facility. The letters in this Appendix have been divided into three sections. Section One contains letters to which the NRC responded by addressing specific comments. Section Two contains the letters that concerned the communities of Forest Grove and Center Springs. Section Three is composed of letters that required no response. These letters were generally in support of the facility.

  19. Evaluation of residual life of material of power plant construction elements after long-term operation

    International Nuclear Information System (INIS)

    Osasyuk, V.V.

    1989-01-01

    Existing methods are analyzed for estimation of residual resource of elements of constructions, working in creep conditions. A suggested and experimentally verified new method of residual durability forecasting is described permitting the value of the supplementary resource to be specified according to the real state of the material after preoperation. Evaluation results are given for residual life of steam lines received by different methods and advantages of the technique proposed are shown. Reliability of the new technique is confirmed by steam line operation at thermal power plants

  20. Gribov horizon and i-particles: About a toy model and the construction of physical operators

    International Nuclear Information System (INIS)

    Baulieu, L.; Dudal, D.; Vandersickel, N.; Guimaraes, M. S.; Sorella, S. P.; Huber, M. Q.; Zwanziger, D.

    2010-01-01

    Restricting the functional integral to the Gribov region Ω leads to a deep modification of the behavior of Euclidean Yang-Mills theories in the infrared region. For example, a gluon propagator of the Gribov type, (k 2 /k 4 +γ 4 ), can be viewed as a propagating pair of unphysical modes, called here i-particles, with complex masses ±iγ 2 . From this viewpoint, gluons are unphysical and one can see them as being confined. We introduce a simple toy model describing how a suitable set of composite operators can be constructed out of i-particles whose correlation functions exhibit only real branch cuts, with associated positive spectral density. These composite operators can thus be called physical and are the toy analogy of glueballs in the Gribov-Zwanziger theory.

  1. Construction of a magnetostrictive hysteresis operator using a tripod-like primitive hopfield neural network

    Science.gov (United States)

    Adly, A. A.; Abd-El-Hafiz, S. K.

    2018-05-01

    It is well known that accurate modeling of magnetostrictive hysteresis is crucial to different industrial applications. Although several magnetostrictive models have been developed in the past, the accuracy-efficiency balance has always been crucial. Recently, the possibility of constructing a primitive vector hysteresis operator using a tri-node Hopfield Neural Network (HNN) was demonstrated. Based upon the fact that mechanical stress along a certain direction results in dimensional deformation, this paper introduces a novel extension to the aforementioned recently developed approach. More specifically, a stress-driven evolution of a tri-node HNN hysteresis operator pair is proposed, thus yielding a tripod-like HNN pair having different input offset values. Model identification, sample simulation results and comparison with experimental measurements are given in the paper.

  2. Design, installation, commissioning and operation of a beamlet monitor in the negative ion beam test stand at NIFS

    Energy Technology Data Exchange (ETDEWEB)

    Antoni, V.; Agostinetti, P.; Brombin, M.; Cervaro, V.; Delogu, R.; Fasolo, D.; Franchin, L.; Ghiraldelli, R.; Molon, F.; Pasqualotto, R.; Serianni, G., E-mail: gianluigi.serianni@igi.cnr.it; Tollin, M.; Veltri, P. [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA) (Italy); De Muri, M. [Consorzio RFX (CNR, ENEA, INFN, Università di Padova, Acciaierie Venete SpA) (Italy); INFN-LNL, v.le dell' Università 2, I-35020, Legnaro (PD) Italy (Italy); Ikeda, K.; Kisaki, M.; Nakano, H.; Takeiri, Y.; Tsumori, K. [National Institute for Fusion Science, 322-6 Oroshi, Toki, Gifu 509-5292 (Japan); Muraro, A. [Istituto di Fisica del Plasma (IFP-CNR) – Via Cozzi 53, 20125, Milano (Italy)

    2015-04-08

    In the framework of the accompanying activity for the development of the two neutral beam injectors for the ITER fusion experiment, an instrumented beam calorimeter is being designed at Consorzio RFX, to be used in the SPIDER test facility (particle energy 100keV; beam current 50A), with the aim of testing beam characteristics and to verify the source proper operation. The main components of the instrumented calorimeter are one-directional carbon-fibre-carbon composite tiles. Some prototype tiles have been used as a small-scale version of the entire calorimeter in the test stand of the neutral beam injectors of the LHD experiment, with the aim of characterising the beam features in various operating conditions. The extraction system of the NIFS test stand source was modified, by applying a mask to the first gridded electrode, in order to isolate only a subset of the beamlets, arranged in two 3×5 matrices, resembling the beamlet groups of the ITER beam sources. The present contribution gives a description of the design of the diagnostic system, including the numerical simulations of the expected thermal pattern. Moreover the dedicated thermocouple measurement system is presented. The beamlet monitor was successfully used for a full experimental campaign, during which the main parameters of the source, mainly the arc power and the grid voltages, were varied. This contribution describes the methods of fitting and data analysis applied to the infrared images of the camera to recover the beamlet optics characteristics, in order to quantify the response of the system to different operational conditions. Some results concerning the beamlet features are presented as a function of the source parameters.

  3. An analysis of errors of commission in the Nordic nuclear power plants based on plant operating experience

    International Nuclear Information System (INIS)

    Pyy, P.; Bento, J.P.; Flodin, Y.

    2001-12-01

    The report presents the methodology followed, the material used and conclusions drawn in a study of active human failures. First, the report discusses the concept of active human failures in the context of human errors. Then, a simplified methodology is presented applicable to analysis of operating experience and documenting all kinds of human failures. Also the material and analysis procedure used in the three parts of the study are discussed. Finally, some selected highlights of results are presented with common conclusions and recommendations. (au)

  4. 77 FR 29701 - Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating...

    Science.gov (United States)

    2012-05-18

    ... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...

  5. Organization and methodology applied to the control of commissioning tests to guarantee safe operation of nuclear units

    International Nuclear Information System (INIS)

    Clausner, J.P.; Jorel, M.

    1990-12-01

    This paper describes the activities of the Safety Analysis Department (DAS), which provides technical support for the French safety authorities in the specific context of analysis and control of startup test programme quality at each of the different stages of the programme. These activities combine to ensure that the objective of the startup tests is reached, in particular that the functions of each safety-related system are guaranteed in all operating configurations, that the performance levels of all components in the system comply with design criteria and that defects revealed during previous tests have been dealt with correctly. The special case of French nuclear facilities, linked to unit standardization, has made it possible to acquire a large amount of experience with the startup of the 900 MWe units and has illustrated the importance of defining a startup test programme. In 1981, a working group, comprising operating organization and safety authority representatives, studied the lessons which had to be learned from 900 MWe unit startup and the improvements which could be made and taken into account in the 1300 MWe unit startup programme. To illustrate the approach adopted by the DAS, we go on to describe the lessons learned from startup of the first 1300 MWe (P4) units

  6. Mitigation for the Construction and Operation of Libby Dam, 2000 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Hoffman, Greg; Marotz, Brian L.; Dunnigan, James (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2002-09-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power Planning Council's resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness.

  7. Construction and initial operation of MHD PbLi facility at UCLA

    Energy Technology Data Exchange (ETDEWEB)

    Smolentsev, S., E-mail: sergey@fusion.ucla.edu; Li, F.-C.; Morley, N.; Ueki, Y.; Abdou, M.; Sketchley, T.

    2013-06-15

    Highlights: • New MHD PbLi loop has been constructed and tested at UCLA. • Pressure diagnostics system has been developed and successfully tested. • Ultrasound Doppler velocimeter is tested as velocity diagnostics. • Experiments on pressure drop reduction have been performed. • Experiments on MHD flow in a duct with SiC flow channel insert are underway. -- Abstract: A magnetohydrodynamic flow facility MaPLE (Magnetohydrodynamic PbLi Experiment) that utilizes molten eutectic alloy lead–lithium (PbLi) as working fluid has been constructed and tested at University of California, Los Angeles. The loop operation parameters are: maximum magnetic field 1.8 T, PbLi temperature up to 350 °C, maximum PbLi flow rate with/without a magnetic field 15/50 l/min, maximum pressure head 0.15 MPa. The paper describes the loop itself and its major components, basic operation procedures, experience of handling PbLi, initial loop testing, flow diagnostics and current and near-future experiments. The obtained test results of the loop and its components have demonstrated that the new facility is fully functioning and ready for experimental studies of magnetohydrodynamic, heat and mass transfer phenomena in PbLi flows and also can be used in mock up testing in conditions relevant to fusion applications.

  8. Advanced boiling water reactor (ABWR). Design, construction, operation and maintenance experience

    International Nuclear Information System (INIS)

    Idesawa, M.

    1998-01-01

    The ABWR has experienced all phases of design, construction, operation and maintenance at Kashiwazaki-Kariwa Nuclear Power Station Units No.6 and 7 and confirmed that originally intended development targets have been achieved with highly satisfactory results. This is the fruit of a project that collected wisdom from various sources under a international cooperative organization, with Tokyo Electric Power Company taking the leading role from the onset. These two units have not only demonstrated that ABWRs have superior performance as the first standard units of advanced light water reactor but also aroused a hope for the big potential advantages that ABWRs can provide us. The ABWR has already been awarded a U.S. standard license for having proved that it can comply with the requirements of international regulatory systems with an ample margin. There are also many construction programs with ABWRs progressing both domestically and abroad, suggesting that it has won recognition as an international standard plant. We will do our utmost to perfect the operation and maintenance records of Kashiwazaki-Kariwa Units No.6 and 7, which is the top runner among ABWRs, and to make known the superiority of this reactor to the world. (J.P.N.)

  9. Project Guarantee 1985. Repository for high-level radioactive waste: construction and operation

    International Nuclear Information System (INIS)

    Anon.

    1985-01-01

    An engineering project study aimed at demonstrating the feasibility of constructing a deep repository for high-level waste (Type C repository) has been carried out; the study is based on a model data-set representing typical geological and rock mechanical conditions as found outside the so-called Permocarboniferous basin in the regions under investigation by Nagra in Cantons Aargau, Schaffhausen, Solothurn and Zuerich. The repository is intended for disposal of high-level waste and any intermediate-level waste from re-processing in which the concentration of long-lived alpha-emitters exceeds the permissible limits set for a Type B repository. Final disposal of high-level waste is in subterranean, horizontally mined tunnels and of intermediate-level waste in underground vertical silos. The repository is intended to accomodate a total of around 6'000 HWL-cylinders (gross volume of around 1'200 m3) and around 10'000 m3 of intermediate-level waste. The total excavated volume is around 1'100'000 m3 and a construction time for the whole repository (up to the beginning of emplacement) of around 15 years is expected. For the estimated 50-year emplacement operations, a working team of around 60 people will be needed and a team of around 160 for the simultaneous tunnelling operations and auxiliary work. The project described in the present report permits the conclusion that construction of a repository for high-level radioactive waste and, if necessary, spent fuel-rods is feasible with present-day technology

  10. Safety evaluation report related to the construction permit and operating license for the research reactor at the University of Texas (Docket No. 50-602)

    International Nuclear Information System (INIS)

    1992-01-01

    The Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission (NRC) has prepared Supplement 1 to NUREG-1135, ''Safety Evaluation Report Related to the Construction Permit and Operating License for the Research Reactor at the University of Texas'' (SER) May 1985. The reactor facility is owned by The University of Texas at Austin (UT, the applicant) and is located at the University's Balcones Research Center in Austin, Texas. This supplement to the SER (SSER) describes the changes to the reactor facility design from the description in the SER. The SER and SSER together reflect the facility as built. The SSER also documents the reviews that the NRC has completed regarding the applicant's emergency plan, security plan, and technical specifications that were identified as open in the SER

  11. Inspecting operating nuclear powerplants: shortcomings in the Nuclear Regulatory Commission program. Fourth report by the Committee on Government Operations together with additional views

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    Workers at every one of this Nation's 69 operating commercial nuclear powerplants conduct a constant vigil of great importance to this country's economy and to the health and safety of its citizens. They must constantly observe, assess and respond to the subtle and complex changes in the operating conditions of a reactor facility. They must do so skillfully enough to prevent major accidents and outages. It is for that reason that extraordinary efforts to train people to anticipate and understand unexpected events are necessary in the nuclear industry. It is for that reason that nuclear powerplant systems must be designed with unusually intricate safeguards against failure, that their maintenance must be meticulous and incessant, and that the condition of those systems must be constantly understood by nuclear plan management to prevent unanticipated degradation or breakdowns. Regrettably, facts disclosed by an oversight investigation by the Government Operations Subcommittee on Environment, Energy and Natural Resources indicate that those high standards have not yet been consistently attained by the nuclear industry or by the NRC. Significant mistakes in judgment and operational errors continue to occur at many operating nuclear powerplants, and the NRC inspection program too often fails to backstop the licensee. Utility failings are not discovered by the NRC in time to prevent costly and even dangerous mistakes from being made

  12. Protocol between the Nuclear Protection and Safety Bureau representing the Nuclear Authorities of Portugal and the Nuclear Energy Commission of Spain on Co-operation in Nuclear Safety

    International Nuclear Information System (INIS)

    1980-01-01

    This Protocol was signed further to the Agreement between Portugal and Spain on 14 January 1971 on co-operation in the peaceful use of nuclear energy. It provides for exchange of information on the general aspects of nuclear safety and radiation protection; study of the basic characteristics of siting, construction, operation and decommissioning of nuclear installations, and experience acquired in these areas; the problematics of planning against nuclear incidents and their environmental impact; legislation, regulations and technical standards concerning nuclear installations. The Protocol entered into force for a period of five years on the day of its signature. (NEA) [fr

  13. Tank Operations Contract Construction Management Methodology. Utilizing The Agency Method Of Construction Management To Safely And Effectively Complete Nuclear Construction Work

    International Nuclear Information System (INIS)

    Leso, K.F.; Hamilton, H.M.; Farner, M.; Heath, T.

    2010-01-01

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  14. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    Energy Technology Data Exchange (ETDEWEB)

    LESO KF; HAMILTON HM; FARNER M; HEATH T

    2010-01-14

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small

  15. Commissioning for the European XFEL facility

    Science.gov (United States)

    Nölle, D.

    2017-06-01

    The European XFEL is a 4th generation light source based on the Self Amplified Spontaneous Emission (SASE) FreeElectron-Laser concept. It is currently being commissioned in North- Germany. The core installation is a 17.5 GeV superconducting accelerator driving 3 SASE lines with photon energies from 1 to beyond 20 keV range with a maximum of 27.000 pulses per second. The international facility is organized as a limited liability company with shareholders from the contributing countries. DESY has taken over the leadership of the accelerator construction consortium, and will be in charge of the operation of the accelerator complex. The facility was set up with contributions from the 11 shareholder countries, either being hardware systems and/or staff or cash contributions. The construction is almost complete, and the commissioning phase has started by the end of 2015. This contribution will report the status of the accelerator complex with emphasis on the commissioning of the accelerator and an outlook to the commissioning of the SASE 1 FEL line.

  16. Commissioning of NSLS-II

    Energy Technology Data Exchange (ETDEWEB)

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  17. Mitigation for the Construction and Operation of Libby Dam, 2004-2005 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2005-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana Fish, Wildlife & Parks (MFWP) uses a combination of techniques to collect physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered and threatened species, and the assessment of restoration or management activities designed to restore native fishes and their habitats.

  18. Mitigation for the Construction and Operation of Libby Dam, 2003-2004 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, Jay; Garrow, Larry (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2004-06-01

    ''Mitigation for the Construction and Operation of Libby Dam'' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating for damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan. Montana FWP uses a combination of diverse techniques to collect a variety of physical and biological data within the Kootenai River Basin. These data serve several purposes including: the development and refinement of models used in management of water resources and operation of Libby Dam; investigations into the limiting factors of native fish populations, gathering basic life history information, tracking trends in endangered, threatened species, and the assessment of restoration or management activities intended to restore native fishes and their habitats.

  19. THE SIMULATION DIAGNOSTIC METHODS AND REGENERATION WAYS OF REINFORCED - CONCRETE CONSTRUCTIONS OF BRIDGES IN PROVIDING THEIR OPERATING RELIABILITY AND LONGEVITY

    Directory of Open Access Journals (Sweden)

    B. V. Savchinskiy

    2010-03-01

    Full Text Available On the basis of analysis of existing diagnostic methods and regeneration ways of reinforced-concrete constructions of bridges the recommendations on introduction of new modern technologies of renewal of reinforced-concrete constructions of bridges in providing their operating reliability and longevity are offered.

  20. THE SIMULATION DIAGNOSTIC METHODS AND REGENERATION WAYS OF REINFORCED - CONCRETE CONSTRUCTIONS OF BRIDGES IN PROVIDING THEIR OPERATING RELIABILITY AND LONGEVITY

    OpenAIRE

    B. V. Savchinskiy

    2010-01-01

    On the basis of analysis of existing diagnostic methods and regeneration ways of reinforced-concrete constructions of bridges the recommendations on introduction of new modern technologies of renewal of reinforced-concrete constructions of bridges in providing their operating reliability and longevity are offered.

  1. Design and construction of automatic operating system of double chamber plasma nitriding device PLC based

    International Nuclear Information System (INIS)

    Saminto; Slamet Santosa; Eko Priyono

    2012-01-01

    The automatic operating system of double chamber plasma nitriding device has been done. The system is used for operating double chamber plasma nitriding automatically as according to the standard operating procedure by pressing push button on the human machine interface (HMI). The system consists of hardware and software. The hardware was constructed using main components T100MD1616+ PLC module and supported by temperature signal conditioner module, Wheatstone bridge module, isolated amplifier module and EMS 30A H Bridge motor driver module. A software program that is planted on T100MD1616+ PLC using ladder diagrams and Tbasic program. Test system functions performed by inserting a set values of temperature and pressure by pressing the button on the human machine interface (HMI). The test results show that the temperature control with a set of values 100 °C obtained stable coverage of 98 °C to 102 °C, (Δ ± 2 °C) with a 2% tolerance and the output voltage of the DAC is 2.436 volts to 2.913 volts. The pressure control with a set of values 2.169 x 10 -1 mbar obtained stable coverage of 1.995 x 10 -1 mbar to 2.205 x 10 -1 mbar, (Δ ± 0.105 x 10 -1 mbar) with a 5% tol. (author)

  2. Nuclear power plants in Europe 1996. Report on operation, construction and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1996-01-01

    Eighteen European countries operate and build, respectively, nuclear power plants in 1996. The 'Nuclear Power Plants in Europe 1996' atw report singles out the main events and lines of development. As per August 1996, 216 (1995: 215) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 177,916 (177,010) MWe installed gross capacity are in operation and 24 (26) units with 23,086 (24,786) MWe are under construction in seven countries. This adds up to a total of 240 (241) nuclear generating units with an aggregate 201,002 (201,796) MWe. In the nuclear power plants in Europe, some 1067 (1048) TWh of nuclear power was converted into electric power in 1995; 802 (792) TWh of this aggregate was converted in 142 (137) units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 36%. Lithuania, with 86 (77)% has the highest share of nuclear power in Europe, followed by France with 76 (75)% and Belgium with 56%. The lowest percentage, only 4 (5)%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power are operated, such as Italy or Austria. (orig.) [de

  3. 1997: Nuclear power plants in Europe. Report on operation, construction and planning in 18 European countries

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    Eighteen European countries operate and build, respectively, nuclear power plants in 1997. The '1997: Nuclear Power Plants in Europe' atw report singles out the main events and lines of development. As per August 1997, 216 (1996: 216) nuclear generating units (which means power reactors for the purposes of this report) with an aggregate 180, 184 (177, 916) MWe installed gross capacity are in operation and 22 (24) units with 20,054 (23,086) MWe are under construction in seven countries. This adds up to a total of 238 (240) nuclear generating units with an aggregate 200,238 (201,002) MWe. In the nuclear power plants in Europe, some 1138 (1067) TWh of nuclear power was converted into electric power in 1996: 806 (802) TWh of this aggregate was converted in 142 (142) units in the European Union (EU). In the EU the share of nuclear power in the public supply of electricity was 35,4 (36,0)%. Lithuania, with 83,4 (85,6)% has the highest share of nuclear power in Europe, followed by France with 77,4 (76,0)% and Belgium with 57,2 (55,5)%. The lowest percentage, only 4,8 (3,8)%, is recorded in the Netherlands. As a consequence of electricity imports, nuclear power holds considerable shares in the public electricity supply also of countries in which no nuclear power is operated, such as Italy or Austria. (orig.) [de

  4. Feasibility of Construction of the Continuously Operating Geodetic GPS Network of Sinaloa, Mexico

    Science.gov (United States)

    Vazquez, G. E.; Jacobo, C.

    2011-12-01

    This research is based on the study and analysis of feasibility for the construction of the geodetic network for GPS continuous operation for Sinaloa, hereafter called (RGOCSIN). A GPS network of continuous operation is defined as that materialized structure physically through permanent monuments where measurements to the systems of Global Positioning (GPS) is performed continuously throughout a region. The GPS measurements in this network are measurements of accuracy according to international standards to define its coordinates, thus constituting the basic structure of geodetic referencing for a country. In this context is that in the near future the RGOCSIN constitutes a system state only accurate and reliable georeferencing in real-time (continuous and permanent operation) and will be used for different purposes; i.e., in addition to being fundamental basis for any lifting topographic or geodetic survey, and other areas such as: (1) Different construction processes (control and monitoring of engineering works); (2) Studies of deformation of the Earth's crust (before and after a seismic event); (3) GPS meteorology (weather forecasting); (4) Demarcation projects (natural and political); (5) Establishment of bases to generate mapping (necessary for the economic and social development of the state); (6) Precision agriculture (optimization of economic resources to the various crops); (7) Geographic information systems (Organization and planning activities associated with the design and construction of public services); (8) Urban growth (possible settlements in the appropriate form and taking care of the environmental aspect), among others. However there are criteria and regulations according to the INEGI (Instituto Nacional de Estadística y Geografía, http://www.inegi.org.mx/) that must be met; even for this stage of feasibility of construction that sees this project as a first phase. The fundamental criterion to be taken into account according to INEGI is a

  5. Effects of construction and operation of a satellite power system upon the magnetosphere

    International Nuclear Information System (INIS)

    Chiu, Y.T.; Luhmann, J.G.; Schulz, M.; Cornwall, J.M.

    1979-01-01

    This is the final report of an initial assessment of magnetospheric effects of the construction and operation of a satellite power system. This assessment effort is based on application of present scientific knowledge rather than on original scientific research. As such, it appears that mass and energy injections of the system are sufficient to modify the magnetosphere substantially, to the extent of possibly requiring mitigation measures for space systems but not to the extent of causing major redirection of efforts and concepts. The scale of the SPS is so unprecedentedly large, however, that these impressions require verification (or rejection) by in-depth assessment based on scientific treatment of the principal issues. Indeed, it is perhaps appropriate to state that present ignorance far exceeds present knowledge in regard to SPS magnetospheric effects, even though we only seek to define the approximate limits of magnetospheric modifications here

  6. Study on the construction and operation for management system of municipal domestic wastes

    Institute of Scientific and Technical Information of China (English)

    Liu Wei; Wang Shuqiang; Chen Jingxin

    2006-01-01

    In recent years, the quantity of our country's municipal domestic wastes increase rapidly, but the waste disposal still has problems, such as the simple way of processing, wasting the resources, the serious environmental pollution and so on. By holding waste minimization as the center, the developed countries have formed perfect waste management system. Based on analyzing the status quo and problems of processing in our country, on the principle of benefit, scale,waste minimization, reclamation and hazard-free treatment, according to the recycling model of processing, the article has constructed our country's domestic wastes management system, proposed the measures of promoting the operation of system. It has realized the transformation of waste management system from terminal disposal to source reduction,achieved the goals, including domestic wastes categorizing and reclaiming, industrialization and non-pollution processing,and finally brought sustainable development for resources, environment, economy and society.

  7. Economic viability of the construction and operation of a biomass gasificator for poultry houses heating

    Energy Technology Data Exchange (ETDEWEB)

    Zanatta, Fabio Luiz; Silva, Jadir Nogueira da; Tinoco, Ilda de Fatima Ferreira; Martin, Samuel; Melo, Lucas D.; Bueno, Mateus [Universidade Federal de Vicosa (DEA/UFV), MG (Brazil). Dept. de Engenharia Agricola], E-mail: fzanatta@vicosa.ufv.br

    2008-07-01

    In all poultry farms, at least in the first days of life of the chicken, it is necessary to heat the environment to obtain a good development of the chicken and good economics results. However, this additional heat generation is sometimes neglected or not well executed, because of the costs that this practice could bring. This research has the objective of analyze the costs of construction and operation of a Biomass Gasificator for Poultry Houses Heating in comparison with a direct furnace system. The fuel used in both systems was firewood of eucalyptus. For so much, economic analyzes was make considering the costs of the gasification systems implementation in substitution of the traditional system used in the company (direct furnace system). For the viability the adopted method was the partial budget and the complementary investments were analyzed through the cash flow elaboration and of determination of indicator of economic feasibility. (author)

  8. Social and legal aspects of preparing the construction and operation of a nuclear power source

    International Nuclear Information System (INIS)

    Curin, K.

    1989-01-01

    The main activities are described involved in creating territorial, technical and economic conditions for the building of nuclear power plants. The basic precondition is the prognostic evaluation of national requirements for power in each planning time stage. From this proceeds the need of a range of power sources with a definition of their types and their incorporation in the power system and of possible power supply to the district heating system. As for nuclear power plants the building should be divided into three stages: from planning investments to the issuance of an investment intent, the stage of construction and that of operation. A detailed description is presented of the activities of all participants in building nuclear power plants in Czechoslovak conditions. Attention is devoted to the aspects of reliability and safety of nuclear power plants and to the effect of the respective activities on reliability and safety. (Z.M.). 1 tab

  9. Construction and operation of a covered lagoon methane recovery system for the Cal Poly Dairy

    International Nuclear Information System (INIS)

    Williams, D.W.; Moser, M.A.; Norris, G.

    1999-01-01

    This paper describes the design, construction and anticipated operation of a lagoon-type methane recovery system for the Cal Poly Dairy. The initial design was based upon the present and anticipated herd size, 300 to 600 cows, heifers and calves. The lagoon design meets USDA-NRCS standards, and accounts for limitations of the site, primarily shallow sandstone bedrock. The new lagoon, which has a liquid volume of 14,000 m 3 , was constructed next to an existing lagoon. The new lagoon was covered with a flexible membrane incorporating buoyant material so that the cover floats on the surface, and a gas collection system. The predicted output of the lagoon for the present population of approximately 350 cows, heifers and calves is estimated to average up to 320 m 3 of biogas per day. The biogas will fuel a micro-turbine electric generator, and produce up to 23 kW in parallel with the utility system. Odor control is the most important non-economic benefit. This project will provide environmental benefits-odor control by capturing the odorous gases that result from dairy manure storage; methane, a significant greenhouse gas is kept out of the atmosphere; and water pollution is reduced through the reduction in organic matter in the lagoon. Economic benefits include electricity and process heat, together worth up to 16,000 US dollars per year. (author)

  10. Making the error-controlling algorithm of observable operator models constructive.

    Science.gov (United States)

    Zhao, Ming-Jie; Jaeger, Herbert; Thon, Michael

    2009-12-01

    Observable operator models (OOMs) are a class of models for stochastic processes that properly subsumes the class that can be modeled by finite-dimensional hidden Markov models (HMMs). One of the main advantages of OOMs over HMMs is that they admit asymptotically correct learning algorithms. A series of learning algorithms has been developed, with increasing computational and statistical efficiency, whose recent culmination was the error-controlling (EC) algorithm developed by the first author. The EC algorithm is an iterative, asymptotically correct algorithm that yields (and minimizes) an assured upper bound on the modeling error. The run time is faster by at least one order of magnitude than EM-based HMM learning algorithms and yields significantly more accurate models than the latter. Here we present a significant improvement of the EC algorithm: the constructive error-controlling (CEC) algorithm. CEC inherits from EC the main idea of minimizing an upper bound on the modeling error but is constructive where EC needs iterations. As a consequence, we obtain further gains in learning speed without loss in modeling accuracy.

  11. Reindeer habitat use in relation to two small wind farms, during preconstruction, construction, and operation.

    Science.gov (United States)

    Skarin, Anna; Alam, Moudud

    2017-06-01

    Worldwide there is a rush toward wind power development and its associated infrastructure. In Fennoscandia, large-scale wind farms comprising several hundred windmills are currently built in important grazing ranges used for Sámi reindeer husbandry. In this study, reindeer habitat use was assessed using reindeer fecal pellet group counts in relation to two relatively small wind farms, with 8 and 10 turbines, respectively. In 2009, 1,315 15-m 2 plots were established and pellet groups were counted and cleaned from the plots. This was repeated once a year in May, during preconstruction, construction, and operation of the wind farms, covering 6 years (2009-2014) of reindeer habitat use in the area. We modeled the presence/absence of any pellets in a plot at both the local (wind farm site) and regional (reindeer calving to autumn range) scale with a hierarchical logistic regression, where spatial correlation was accounted for via random effects, using vegetation type, and the interaction between distance to wind turbine and time period as predictor variables. Our results revealed an absolute reduction in pellet groups by 66% and 86% around each wind farm, respectively, at local scale and by 61% at regional scale during the operation phase compared to the preconstruction phase. At the regional, scale habitat use declined close to the turbines in the same comparison. However, at the local scale, we observed increased habitat use close to the wind turbines at one of the wind farms during the operation phase. This may be explained by continued use of an important migration route close to the wind farm. The reduced use at the regional scale nevertheless suggests that there may be an overall avoidance of both wind farms during operation, but further studies of reindeer movement and behavior are needed to gain a better understanding of the mechanisms behind this suggested avoidance.

  12. Commissioning of ATLAS

    CERN Document Server

    Thomas, J

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focussing on combined running and track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  13. Construction of an integrated down-converter for operation at 200 GHz

    International Nuclear Information System (INIS)

    Digby, J.W.

    1999-05-01

    There is currently considerable interest in the part of the electromagnetic spectrum known as the terahertz region (100 GHz to 10 THz). Traditionally, terahertz radiation was the preserve of specialist applications in astronomy, atmospheric studies and plasma diagnostics. However, potential or actual applications in such diverse fields as medicine, security, communications and military applications are now emerging. At present there are very few devices and systems that operate in this spectral region and those which exist are expensive and difficult to manufacture. For the potential of terahertz radiation to be realised by industry, a low-cost (i.e. 'manufacturable') method of constructing terahertz systems is needed; new methods of generating radiation at terahertz frequencies are also urgently required. This thesis presents the development of a novel technique for producing passive and active devices and systems for use at terahertz frequencies. This novel approach utilises standard semiconductor techniques to fabricate metal-pipe waveguides directly onto semiconductor wafers. As standard semiconductor techniques are used, it provides a possible low-cost and highly manufacturable method of producing terahertz devices and systems. The key processes that are needed to produce components and devices for terahertz systems have been developed and presented in this work. Metal-pipe rectangular waveguides for use at W-band (70 GHz - 110 GHz) and G-band (140 GHz - 220 GHz) have been fabricated and S-parameter measurements have been performed on them using a specially designed test fixture. The measured attenuation for these waveguides is approximately 0.2 dB to 5 dB per guide wavelength for W-band and 0.6 dB per guide wavelength for G-band; these results suggest that these components could be used in practical systems. A method of interfacing with terahertz systems and free-space is needed in real applications, so a horn antenna has been designed which can be

  14. A physiological exploration on operational stance and occupational musculoskeletal problem manifestations amongst construction labourers of West Bengal, India.

    Science.gov (United States)

    Chatterjee, Arijit; Sahu, Subhashis

    2018-03-29

    A huge number of labourers engaged in construction industry in India both in organized and unorganized sectors. The construction labourers most often work for an extended period of time and they are compelled to uphold altered static and dynamic operational stance in awkward positions during the complete period of work which raises the demand on the musculoskeletal system and may lead to work related musculoskeletal disorders (WRMSDs). This study is intended to explore the operational stance and occupation related musculoskeletal manifestations amongst the construction labourers. One sixty four male labourers from different construction sites of West Bengal was randomly taken for this study. A modified Nordic questionnaire on MSD and the 12 item General Health Questionnaire (GHQ12) were administered on the construction labourers. Rapid Entire Body Assessment [REBA] and Ovako Work Analysis System [OWAS] methods were applied to analyze the operational stance. Finally, discomfort levels of the specific operational stance were calculated by the use of risk level and BPD scale. From the study it was revealed that most of the construction labourers habitually in awkward operational stance and were affected by altering musculoskeletal manifestations like pain in low back, neck, and wrist. It has been also found that there is a significant (pconstruction labourers in unorganized sectors.

  15. The design, construction, and operation of the Integrated Radwaste Treatment System (IRTS) Drum Cell

    International Nuclear Information System (INIS)

    Landau, B.; Russillo, A.; Frank, D.; Garland, D.

    1989-12-01

    This report describes the design, construction, and the operation of the Integrated Radwaste Treatment Systems (IRTS) Drum Cell at the West Valley Demonstration Project (WVDP), West Valley, New York. The IRTS Drum Cell was designed to provide a shielded, secure storage area for the remote handling and placement of low-level Class C radioactive waste produced in the IRTS. The Drum Cell was designed to contain up to approximately 8,804 drums from decontaminated supernatant processing. This waste is to be poured into 0.27m 3 in a temperature controlled environment to ensure the cement will not be subjected to freezing and thawing cycles. A Temporary Weather Structure (TWS), a pre-engineered building, now encloses the Drum Cell and associated equipment so that remote waste-handling and placement operations can continue without regard to weather conditions. The Drum Cell was designed so that this TWS could be removed and the low-level waste entombed in place. Final disposition of this low-level waste is currently being evaluated in an Environmental Impact Statement (EIS). 10 refs., 11 figs., 1 tab

  16. Production of environmentally friendly aerated concrete with required construction and operational properties

    Directory of Open Access Journals (Sweden)

    Tkach Evgeniya

    2018-01-01

    Full Text Available The purpose of these studies is to justify the feasibility of recycling different types of industrial waste instead of conventional expensive raw materials in production of environmentally friendly aerated concrete with required construction and operational properties. The impact of wastes from various industries on the environmental condition of affected areas, as well as the results of their environmental assessment were analyzed to determine whether these wastes could be used in production of high-performance building materials. The assessment of industrial wastes in aerated concrete production suggests that industrial wastes of hazard class IV can be recycled to produce aerated concrete. An environmentally friendly method for large-scale waste recycling, including a two-step environmentally sustainable mechanism, was developed. The basic quality indicators of the modified aerated concrete proved that the environmental safety could be enhanced by strengthening the structure, increasing its uniformity and improving thermal insulation properties. The modified non-autoclaved aerated concrete products with improved physical and operational properties were developed. They have the following properties: density – D700; class of concrete – B3.5; thermal transmittance coefficient – 0.143 W/(m·°C; frost resistance – F75.

  17. 77 FR 33782 - License Amendment To Construct and Operate New In Situ Leach Uranium Recovery Facility; Uranium...

    Science.gov (United States)

    2012-06-07

    ... and Operate New In Situ Leach Uranium Recovery Facility; Uranium One Americas; Ludeman AGENCY: Nuclear... provided the first time that a document is referenced. The Ludeman facility In Situ Leach Uranium Recovery... request to amend Source Material License SUA-1341 to construct and operate a new in situ leach uranium...

  18. Experience from the construction and operation of the STAR PXL detector

    International Nuclear Information System (INIS)

    Greiner, L.; Anderssen, E.C.; Contin, G.; Silber, J.; Stezelberger, T.; Vu, C.; Wieman, H.H.; Woodmansee, S.; Schambach, J.; Sun, X.; Szelezniak, M.

    2015-01-01

    A new silicon based vertex detector called the Heavy Flavor Tracker (HFT) was installed at the Soleniodal Tracker At RHIC (STAR) experiment for the Relativistic Heavy Ion Collider (RHIC) 2014 heavy ion run to improve the vertex resolution and extend the measurement capabilities of STAR in the heavy flavor domain. The HFT consists of four concentric cylinders around the STAR interaction point composed of three different silicon detector technologies based on strips, pads and for the first time in an accelerator experiment CMOS monolithic active pixels (MAPS) . The two innermost layers at a radius of 2.8 cm and 8 cm from the beam line are constructed with 400 high resolution MAPS sensors arranged in 10-sensor ladders mounted on 10 thin carbon fiber sectors giving a total silicon area of 0.16 m 2 . Each sensor consists of a pixel array of nearly 1 million pixels with a pitch of 20.7 μm with column-level discriminators, zero-suppression circuitry and output buffer memory integrated into one silicon die with a sensitive area of ∼ 3.8 cm 2 . The pixel (PXL) detector has a low power dissipation of 170 mW/cm 2 , which allows air cooling. This results in a global material budget of 0.5% radiation length per layer for detector used in this run. A novel mechanical approach to detector insertion allows for the installation and integration of the pixel sub detector within a 12 hour period during an on-going STAR run. The detector specifications, experience from the construction and operation, lessons learned and initial measurements of the PXL performance in the 200 GeV Au-Au run will be presented

  19. Experience from the construction and operation of the STAR PXL detector

    Science.gov (United States)

    Greiner, L.; Anderssen, E. C.; Contin, G.; Schambach, J.; Silber, J.; Stezelberger, T.; Sun, X.; Szelezniak, M.; Vu, C.; Wieman, H. H.; Woodmansee, S.

    2015-04-01

    A new silicon based vertex detector called the Heavy Flavor Tracker (HFT) was installed at the Soleniodal Tracker At RHIC (STAR) experiment for the Relativistic Heavy Ion Collider (RHIC) 2014 heavy ion run to improve the vertex resolution and extend the measurement capabilities of STAR in the heavy flavor domain. The HFT consists of four concentric cylinders around the STAR interaction point composed of three different silicon detector technologies based on strips, pads and for the first time in an accelerator experiment CMOS monolithic active pixels (MAPS) . The two innermost layers at a radius of 2.8 cm and 8 cm from the beam line are constructed with 400 high resolution MAPS sensors arranged in 10-sensor ladders mounted on 10 thin carbon fiber sectors giving a total silicon area of 0.16 m2. Each sensor consists of a pixel array of nearly 1 million pixels with a pitch of 20.7 μm with column-level discriminators, zero-suppression circuitry and output buffer memory integrated into one silicon die with a sensitive area of ~ 3.8 cm2. The pixel (PXL) detector has a low power dissipation of 170 mW/cm2, which allows air cooling. This results in a global material budget of 0.5% radiation length per layer for detector used in this run. A novel mechanical approach to detector insertion allows for the installation and integration of the pixel sub detector within a 12 hour period during an on-going STAR run. The detector specifications, experience from the construction and operation, lessons learned and initial measurements of the PXL performance in the 200 GeV Au-Au run will be presented.

  20. Construction, start-up and operation of Dukovany nuclear power plant

    International Nuclear Information System (INIS)

    Hornicek, Z.

    1989-01-01

    The Labor Safety Inspectorate have been supervising the construction of the Dukovany nuclear power plant since the construction start in 1977. It was found that in concreting the reactor building walls with concrete mixes, the regulations were not observed on the highest level for the concrete mix drop, and on the gap processing and concrete treatment when concreting was interrupted. Thus, concreting was halted until the conditions for concreting were met. Attention was focused on the protection of the hermetic casing from damage, which had very often happened. A number of shortcomings were detected in storing technology parts. The cleanliness was inspected of the facilities being assembled. The inspections also revealed shortcomings in sealed space tightness. The inspections of assembly and testing of facilities showed failures of the facilities themselves (control valves, electric motors, filter and pump sealing) and of the assembly process. Faults were also detected in electrical equipment. Only a very small part of the installation showed lifetime as specified by Decree 105/1982 Coll. laws on safety assurance in the nuclear power industry. Missing data in documentation led to delays in the start-up stages. The State Surveillance Body also inspected the results of equipment testing. Prior to physical start-up, all production facilities and buildings were inspected, labor safety was inspected for all personnel in communicating corridors, staircases, manholes and onservice and handling posts. Shortcomings were removed. The organization of assembly work was a considerable problem if staff from more organizations had to work together in the same workplace. A list of tasks is presented of State Surveillance Body in operation, maintenance, outages, repairs, and troubleshooting in a nuclear power plant. (J.B.)

  1. Construct validity in Operations Management by using Rasch Measurement Theory. The case of the construct “motivation to implement continuous improvement"

    Directory of Open Access Journals (Sweden)

    Lidia Sanchez-Ruiz

    2016-12-01

    Full Text Available Construct design and validation is a common practise in the Operations Management field. In this sense, the aim of this study is to present Rasch Measurement Theory (RMT as richful and useful methodology in order to validate constructs. In order to do so, the measurement controversy in the social science is presented; then, RMT is explained as a solution for this measurement issue; after that, the different applications of RMT are described and, finally, the different stages of the validation process are presented. Thus, this work aims to serve as a guide for those researchers interested in the methodology. Therefore, a specific case is included: the validation of the construct “motivation to implement continuous improvement”.

  2. Libby Mitigation Program, 2007 Annual Progress Report: Mitigation for the Construction and Operation of Libby Dam.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James; DeShazer, J.; Garrow, L.

    2009-05-26

    and fish habitat in basin streams and lakes. 'Mitigation for the Construction and Operation of Libby Dam' is part of the Northwest Power and Conservation Council's (NPCC) resident fish and wildlife program. The program was mandated by the Northwest Planning Act of 1980, and is responsible for mitigating damages to fish and wildlife caused by hydroelectric development in the Columbia River Basin. The objective of Phase I of the project (1983 through 1987) was to maintain or enhance the Libby Reservoir fishery by quantifying seasonal water levels and developing ecologically sound operational guidelines. The objective of Phase II of the project (1988 through 1996) was to determine the biological effects of reservoir operations combined with biotic changes associated with an aging reservoir. The objectives of Phase III of the project (1996 through present) are to implement habitat enhancement measures to mitigate for dam effects, to provide data for implementation of operational strategies that benefit resident fish, monitor reservoir and river conditions, and monitor mitigation projects for effectiveness. This project completes urgent and high priority mitigation actions as directed by the Kootenai Subbasin Plan.

  3. 77 FR 22573 - Information Collections Being Reviewed by the Federal Communications Commission Under Delegated...

    Science.gov (United States)

    2012-04-16

    .... Privacy Impact Assessment(s): No impact(s). Nature and Extent of Confidentiality: There is no need for... to notify the Commission in writing when the station commences operation. Such notification shall be... time to complete construction of the station and commence operation shall request an extension of time...

  4. Equivalent construction of the infinitesimal time translation operator in algebraic dynamics algorithm for partial differential evolution equation

    Institute of Scientific and Technical Information of China (English)

    2010-01-01

    We give an equivalent construction of the infinitesimal time translation operator for partial differential evolution equation in the algebraic dynamics algorithm proposed by Shun-Jin Wang and his students. Our construction involves only simple partial differentials and avoids the derivative terms of δ function which appear in the course of computation by means of Wang-Zhang operator. We prove Wang’s equivalent theorem which says that our construction and Wang-Zhang’s are equivalent. We use our construction to deal with several typical equations such as nonlinear advection equation, Burgers equation, nonlinear Schrodinger equation, KdV equation and sine-Gordon equation, and obtain at least second order approximate solutions to them. These equations include the cases of real and complex field variables and the cases of the first and the second order time derivatives.

  5. Effects of golf course construction and operation on water chemistry of headwater streams on the Precambrian Shield

    International Nuclear Information System (INIS)

    Winter, Jennifer G.; Dillon, Peter J.

    2005-01-01

    To investigate the effects of golf course construction and operation on the water chemistry of Shield streams, we compared the water chemistry in streams draining golf courses under construction (2) and in operation (5) to streams in forested reference locations and to upstream sites where available. Streams were more alkaline and higher in base cation and nitrate concentrations downstream of operational golf courses. Levels of these parameters and total phosphorus increased over time in several streams during golf course construction through to operation. There was evidence of inputs of mercury to streams on two of the operational courses. Nutrient (phosphorus and nitrogen) concentrations were significantly related to the area of unmanaged vegetation in a 30 x 30 m area on either side of the sampling sites, and to River Bank Quality Index scores, suggesting that maintaining vegetated buffers along the stream on golf courses will reduce in-stream nutrient concentrations. - Golf course construction and operation had a significant impact on alkalinity, nitrogen and base cation concentrations of streams

  6. Economic and ecological assessment of impact of construction and operation of nuclear power plant as large capital construction project with respect to control of national economy development

    International Nuclear Information System (INIS)

    Bucek, M.

    1984-01-01

    The evaluation of costs and environmental impacts of the construction and operation of nuclear power plants is concentrated into two problem areas: 1. the calculation of capital and operation costs for the prevention and minimization of envirommental damage and restoration of the environment, 2. the calculation of damage to the environment of nuclear power plant construction and operation. The ecological cost benefit of capital costs is assessed. In Czechoslovakia there does not exist any method for converting cost effectiveness of investments into environmental protection. This problem is incorporated in the general method of assessing capital cost benefit. The relations are given for total socio-economic capital cost benefit and cost benefit of investments into environmental protection. Ecological investment is not exempted from the investment fund and from the point of view of content may be devided into net and gross ecological investment and from the point of view of time into preventive and compensation ecological investment. In the USSR the method has beem developed of the ecological and economic evaluation of projects for the construction and reconstruction of production units which proceeds from the evaluation of the negative environmental impact of wastes. The basic relations are given of the benefit of ecological investments. (E.S.)

  7. A Study on the Construct Validity of Safety Culture Oversight Model for Nuclear Power Operating Organization

    International Nuclear Information System (INIS)

    Jung, Su Jin; Choi, Young Sung; Oh, Jang Jin

    2015-01-01

    In Korea, the safety policy statement declared in 1994 by government stressed the importance of safety culture and licensees were encouraged to manage and conduct their self-assessments. A change in regulatory position about safety culture oversight was made after the event of SBO cover-up in Kori unit 1 and several subsequent falsification events. Since then KINS has been developing licensee's safety culture oversight system including conceptual framework of oversight, prime focus area for oversight, and specific details on regulatory expectations, all of which are based on defence-in-depth (DiD) safety enhancement approach. Development and gathering of performance data which is related to actual 'safety' of nuclear power plant are needed to identify the relationship between safety culture and safety performance. Authors consider this study as pilot which has a contribution on verifying the construct validity of the model and the effectiveness of survey based research. This is the first attempt that the validity of safety culture oversight model has been investigated with empirical data obtained from Korean nuclear power operating organization

  8. Removal of nitrogen and phosphorus from dairy wastewater using constructed wetlands systems operating in batch

    Directory of Open Access Journals (Sweden)

    Ronaldo Rocha Bastos

    2012-08-01

    Full Text Available This work presents the results of a study conducted for a period of seven months on the effectiveness of constructed wetland systems for the treatment of dairy wastewater aiming at removing, nitrogen and phosphorus. Six experimental systems were assembled with a net volume of 115 L using HDPE tanks, with length/width ratio of 2:1. In three of the systems, gravel 0 was used as substrate, while gravel 0 and sand was used in the three others, in the percentage of 80% and 20%, respectively. The systems were operated in batch cycles of 48 hours, applying 7.5 L of influent per cycle. Four of the experimental units were cultivated, and two kept as controls. The selected species chosen were the macrophytes, Typha domingensis and Hedychium coronarium. The removal efficiency concerning nitrogen compounds showed to be quite promising with values ranging from 29.4 to 73.4%, while phosphorus removal from the beds was lower, reaching efficiencies between 18.61 and 34.3%, considered good values, since the removal of these substances is quite difficult through conventional treatment.

  9. Final environmental impact statement, construction and operation of the Spallation Neutron Source. Volume 2

    International Nuclear Information System (INIS)

    1999-04-01

    DOE issued the ''Draft Environmental Impact Statement: Construction and Operation of the Spallation Neutron Source'' in December 1998. This document was made available for review by federal agencies; tribal governments; the state of Tennessee, New Mexico, Illinois, and New York; local governments; and the general public. DOE invited comments on the accuracy and adequacy of the DEIS and any other matters pertaining to environmental review of the document. The formal review and comment period extended from December 24, 1998 until February 8, 1999. DOE considered all comments submitted after the review and comment period. This appendix to the Final Environmental Impact Statement (FEIS) contains the 206 comments received and the DOE responses to these comments. It consists of four chapters. Chapter 1 provides an introduction to the contents of this appendix and discusses the general methodology DOE used for documenting, considering, and responding to the review comments on the DEIS. Chapter 2 summarizes the principal issues of public concern collectively reflected by the comments and presents DOE's responses to these issues. The full texts of the comments on the DEIS are presented in Chapter 3. Chapter 4 contains DOE's written responses to these comments and the locations of textual changes in the FEIS that were made in response to the comments

  10. Treatment of industrial effluents in constructed wetlands: challenges, operational strategies and overall performance.

    Science.gov (United States)

    Wu, Shubiao; Wallace, Scott; Brix, Hans; Kuschk, Peter; Kirui, Wesley Kipkemoi; Masi, Fabio; Dong, Renjie

    2015-06-01

    The application of constructed wetlands (CWs) has significantly expanded to treatment of various industrial effluents, but knowledge in this field is still insufficiently summarized. This review is accordingly necessary to better understand this state-of-the-art technology for further design development and new ideas. Full-scale cases of CWs for treating various industrial effluents are summarized, and challenges including high organic loading, salinity, extreme pH, and low biodegradability and color are evaluated. Even horizontal flow CWs are widely used because of their passive operation, tolerance to high organic loading, and decolorization capacity, free water surface flow CWs are effective for treating oil field/refinery and milking parlor/cheese making wastewater for settlement of total suspended solids, oil, and grease. Proper pretreatment, inflow dilutions through re-circulated effluent, pH adjustment, plant selection and intensifications in the wetland bed, such as aeration and bioaugmentation, are recommended according to the specific characteristics of industrial effluents. Copyright © 2015 Elsevier Ltd. All rights reserved.

  11. The construction and operation of a low-cost poultry waste digester.

    Science.gov (United States)

    Steinsberger, S C; Shih, J C

    1984-05-01

    A simple and low-cost poultry waste digester (PWD) was constructed to treat the waste from 4000 caged laying hens on University Research Unit No. 2 at North Carolina State University. The system was built basically of a plastic lining with insulation, a heating system, a hot-water tank, and other metering equipment. It was operated at 50 degrees C and pH 7.5-8.0. The initiation of methane production was achieved using the indigenous microflora in the poultry waste. At an optimal loading rate (7.5 kg volatile solids/m(3) day), the PWD produced biogas (55% methane) at a rate of 4.0 m(3)/m(3) day. The PWD was biologically stable and able to tolerate temporary overloads and shutdowns. A higher loading rate failed to maintain a high gas production rate and caused drops in methane content and pH value. Under optimal conditions, a positive energy balance was demonstrated with a net surplus of 50.6% of the gross energy. For methane production, the PWD system was proved to be technically feasible. The simple design and inexpensive materials used for this model could significantly reduce the cost of digestion compared to more conventional systems. More studies are needed to determine the durability, the required maintenance of the system, and the most economical method of biogas and solid residue utilization.

  12. On the factorial and construct validity of the Intrinsic Motivation Inventory: conceptual and operational concerns.

    Science.gov (United States)

    Markland, D; Hardy, L

    1997-03-01

    The Intrinsic Motivation Inventory (IMI) has been gaining acceptance in the sport and exercise domain since the publication of research by McAuley, Duncan, and Tammen (1989) and McAuley, Wraith, and Duncan (1991), which reported confirmatory support for the factorial validity of a hierarchical model of intrinsic motivation. Authors of the present study argue that the results of these studies did not conclusively support the hierarchical model and that the model did not accurately reflect the tenets of cognitive evaluation theory (Deci & Ryan, 1985) from which the IMI is drawn. It is also argued that a measure of perceived locus of causality is required to model intrinsic motivation properly. The development of a perceived locus of causality for exercise scale is described, and alternative models, in which perceived competence and perceived locus of causality are held to have causal influences on intrinsic motivation, are compared with an oblique confirmatory factor analytic model in which the constructs are held at the same conceptual level. Structural equation modeling showed support for a causal model in which perceived locus of causality mediates the effects of perceived competence on pressure-tension, interest-enjoyment, and effort-importance. It is argued that conceptual and operational problems with the IMI, as currently used, should be addressed before it becomes established as the instrument of choice for assessing levels of intrinsic motivation.

  13. Construction and Operation Costs of Wastewater Treatment and Implications for the Paper Industry in China.

    Science.gov (United States)

    Niu, Kunyu; Wu, Jian; Yu, Fang; Guo, Jingli

    2016-11-15

    This paper aims to develop a construction and operation cost model of wastewater treatment for the paper industry in China and explores the main factors that determine these costs. Previous models mainly involved factors relating to the treatment scale and efficiency of treatment facilities for deriving the cost function. We considered the factors more comprehensively by adding a regional variable to represent the economic development level, a corporate ownership factor to represent the plant characteristics, a subsector variable to capture pollutant characteristics, and a detailed-classification technology variable. We applied a unique data set from a national pollution source census for the model simulation. The major findings include the following: (1) Wastewater treatment costs in the paper industry are determined by scale, technology, degree of treatment, ownership, and regional factors; (2) Wastewater treatment costs show a large decreasing scale effect; (3) The current level of pollutant discharge fees is far lower than the marginal treatment costs for meeting the wastewater discharge standard. Key implications are as follows: (1) Cost characteristics and impact factors should be fully recognized when planning or making policies relating to wastewater treatment projects or technology development; (2) There is potential to reduce treatment costs by centralizing wastewater treatment via industrial parks; (3) Wastewater discharge fee rates should be increased; (4) Energy efficient technology should become the future focus of wastewater treatment.

  14. A Study on the Construct Validity of Safety Culture Oversight Model for Nuclear Power Operating Organization

    Energy Technology Data Exchange (ETDEWEB)

    Jung, Su Jin; Choi, Young Sung; Oh, Jang Jin [Korea Institute of Nuclear Safety, Daejeon (Korea, Republic of)

    2015-05-15

    In Korea, the safety policy statement declared in 1994 by government stressed the importance of safety culture and licensees were encouraged to manage and conduct their self-assessments. A change in regulatory position about safety culture oversight was made after the event of SBO cover-up in Kori unit 1 and several subsequent falsification events. Since then KINS has been developing licensee's safety culture oversight system including conceptual framework of oversight, prime focus area for oversight, and specific details on regulatory expectations, all of which are based on defence-in-depth (DiD) safety enhancement approach. Development and gathering of performance data which is related to actual 'safety' of nuclear power plant are needed to identify the relationship between safety culture and safety performance. Authors consider this study as pilot which has a contribution on verifying the construct validity of the model and the effectiveness of survey based research. This is the first attempt that the validity of safety culture oversight model has been investigated with empirical data obtained from Korean nuclear power operating organization.

  15. Authorization procedure for the construction and operation of nuclear installations within the EC Member States, including supervision and control

    International Nuclear Information System (INIS)

    Amaducci, Sandro; Didier, J.M.

    1978-01-01

    This report is an updating of the report EUR 5284, Authorization procedure for the construction and operation of nuclear installations within the EEC Member States, prepared in 1974 by J.M. Didier and Associates. Recent developments regarding the authorization procedure for the construction and operation of nuclear installations have taken place in Italy (introduction of a site approval procedure) and in Denmark (adoption of an overall legislation on the subject, however not yet in force). With respect to supervision and control of nuclear installations during construction and operation, competences of, as well as their exercise by, supervisory authorities in all EC Member States, with the exception of Ireland, are also analysed in the current study

  16. Reactor Safety Commission Code of Practice for Pressurized Water Reactors

    International Nuclear Information System (INIS)

    1990-01-01

    The Reactor Safety Commission of the Federal German Republic has summarized in the form of Official Guidelines the safety requirements which, in the Commission's view, have to be met in the design, construction and operation of a nuclear power station equipped with a pressurized water reactor. The Third Edition of the RSK Guidelines for pressurized water reactors dated 14.10.81. is a revised and expanded version of the Second Edition dated 24.1.79. The Reactor Safety Commission will with effect from October 1981 use these Guidelines in consultations on the siting of and safety concept for the installation approval of future pressurized water reactors and will assess these nuclear power stations during their erection in the light of these Guidelines. They have not however been immediately conceived for the adaptation of existing nuclear power stations, whether under construction or in operation. The scope of application of these Guidelines to such nuclear power stations will have to be examined for each individual case. The main aim of the Guidelines is to simplify the consultation process within the reactor Safety Commission and to provide early advice on the safety requirements considered necessary by the Commission. (author)

  17. A Continuing Education Short Course and Engineering Curriculum to Accelerate Workforce Development in Wind Power Plant Design, Construction, and Operations

    Energy Technology Data Exchange (ETDEWEB)

    Tinjum, James [Univ. of Wisconsin, Madison, WI (United States)

    2012-11-29

    Significant advances in wind turbine technology and wind turbine power plant capabilities are appearing in the U.S. Sites that only 10 years ago might have been overlooked are being considered for build out. However, the development of a skilled workforce in the engineering fields and construction trades lags the potential market, especially if the industry is expected to site, design, construct, and operate sufficient wind power plant sites to meet the potential for 20% wind energy by 2030. A select few firms have penetrated the engineer-procure-construction (EPC) market of wind power plant construction. Competition and know-how in this market is vital to achieve cost-effective, design-construct solutions. The industry must produce or retrain engineers, contractors, and technicians to meet ambitious goals. Currently, few universities offer undergraduate or graduate classes that teach the basics in designing, building, and maintaining wind power plants that are safe, efficient, and productive.

  18. Environmental assessment for construction and operation of a Human Genome Laboratory at Lawrence Berkeley Laboratory, Berkeley, California

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    Lawrence Berkeley Laboratory (LBL) proposes to construct and operate a new laboratory for consolidation of current and future activities of the Human Genome Center (HGC). This document addresses the potential direct, indirect, and cumulative environmental and human-health effects from the proposed facility construction and operation. This document was prepared in accordance the National Environmental Policy Act of 1969 (United States Codes 42 USC 4321-4347) (NEPA) and the US Department of Energy`s (DOE) Final Rule for NEPA Implementing Procedures [Code of Federal Regulations 10CFR 1021].

  19. Environmental assessment for the construction and operation of waste storage facilities at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    International Nuclear Information System (INIS)

    1994-06-01

    DOE is proposing to construct and operate 3 waste storage facilities (one 42,000 ft 2 waste storage facility for RCRA waste, one 42,000 ft 2 waste storage facility for toxic waste (TSCA), and one 200,000 ft 2 mixed (hazardous/radioactive) waste storage facility) at Paducah. This environmental assessment compares impacts of this proposed action with those of continuing present practices aof of using alternative locations. It is found that the construction, operation, and ultimate closure of the proposed waste storage facilities would not significantly affect the quality of the human environment within the meaning of NEPA; therefore an environmental impact statement is not required

  20. Indexes to Commission issuances, October 8, 1956--January 18, 1975

    International Nuclear Information System (INIS)

    1978-05-01

    The document contains digests and indexes for regulatory decisions of the Atomic Energy Commission and its hearing examiners rendered under the Atomic Energy Act of 1954 and published in ATOMIC ENERGY COMMISSION REPORTS, Volumes 1 through 8 covering 1956 through January 1975. Information elements common to the cases heard and ruled upon are (1) case names (owners of facility); (2) name of facility, docket number; (3) type of hearing (for construction permit, operating license, etc.); (4) issues raised by appellants; (5) issuance number; (6) type of issuance (memorandum, order, decision, etc.); (7) issuance pagination; (8) legal citations (cases, regulations, and statutes); and (9) subject matter of issues and/or rulings

  1. Technical management on commissioning test of nuclear heating reactor

    International Nuclear Information System (INIS)

    Zhang Yajun; Su Qingshan

    1999-01-01

    The commissioning is the last construction stage of a nuclear heating project. The commissioning quality will directly affect on the safe operation and availability of the heating reactor. The author presents the whole test process until the completion of the test report from the point of test documents, including the preparation and execution of the test, the management of the various unexpected events during the test. And it will be emphatically discussed that the managing procedures of the various unexpected events during the test, including temporary control change, setpoint change, unexpected events and design change

  2. The design, construction, and operation of long-distance high-voltage electricity transmission technologies.

    Energy Technology Data Exchange (ETDEWEB)

    Molburg, J. C.; Kavicky, J. A.; Picel, K. C.

    2008-03-03

    This report focuses on transmission lines, which operate at voltages of 115 kV and higher. Currently, the highest voltage lines comprising the North American power grid are at 765 kV. The grid is the network of transmission lines that interconnect most large power plants on the North American continent. One transmission line at this high voltage was built near Chicago as part of the interconnection for three large nuclear power plants southwest of the city. Lines at this voltage also serve markets in New York and New England, also very high demand regions. The large power transfers along the West Coast are generally at 230 or 500 kV. Just as there are practical limits to centralization of power production, there are practical limits to increasing line voltage. As voltage increases, the height of the supporting towers, the size of the insulators, the distance between conductors on a tower, and even the width of the right-of-way (ROW) required increase. These design features safely isolate the electric power, which has an increasing tendency to arc to ground as the voltage (or electrical potential) increases. In addition, very high voltages (345 kV and above) are subject to corona losses. These losses are a result of ionization of the atmosphere, and can amount to several megawatts of wasted power. Furthermore, they are a local nuisance to radio transmission and can produce a noticeable hum. Centralized power production has advantages of economies of scale and special resource availability (for instance, hydro resources), but centralized power requires long-distance transfers of power both to reach customers and to provide interconnections for reliability. Long distances are most economically served at high voltages, which require large-scale equipment and impose a substantial footprint on the corridors through which power passes. The most visible components of the transmission system are the conductors that provide paths for the power and the towers that keep these

  3. Methods for Automated and Continuous Commissioning of Building Systems

    Energy Technology Data Exchange (ETDEWEB)

    Larry Luskay; Michael Brambley; Srinivas Katipamula

    2003-04-30

    Avoidance of poorly installed HVAC systems is best accomplished at the close of construction by having a building and its systems put ''through their paces'' with a well conducted commissioning process. This research project focused on developing key components to enable the development of tools that will automatically detect and correct equipment operating problems, thus providing continuous and automatic commissioning of the HVAC systems throughout the life of a facility. A study of pervasive operating problems reveled the following would most benefit from an automated and continuous commissioning process: (1) faulty economizer operation; (2) malfunctioning sensors; (3) malfunctioning valves and dampers, and (4) access to project design data. Methodologies for detecting system operation faults in these areas were developed and validated in ''bare-bones'' forms within standard software such as spreadsheets, databases, statistical or mathematical packages. Demonstrations included flow diagrams and simplified mock-up applications. Techniques to manage data were demonstrated by illustrating how test forms could be populated with original design information and the recommended sequence of operation for equipment systems. Proposed tools would use measured data, design data, and equipment operating parameters to diagnosis system problems. Steps for future research are suggested to help more toward practical application of automated commissioning and its high potential to improve equipment availability, increase occupant comfort, and extend the life of system equipment.

  4. Direct approach to operator conformal constructions: from fermions to primary fields

    International Nuclear Information System (INIS)

    Halpern, M.B.

    1989-01-01

    I discuss the direct solution of Sugawara and coset constructions, including a path to construction of the primary fields. The basic tools are (1) a construction of affine-conformal highest-weight states, pretensors and tensors form quantum-irreducible representations of the currents of affine g, and (2) construction of primary fields by factorization and boosting of the pretensors. Large classes of pretensors are easily obtained in fermionic constructions, and guesswork is minimized with factorization of bosonized fermionic pretensors: The simplest case constructs conformal-weights h g =mN(n--N)/2n of SU m (n) and h K =mN(n--N)/n of SU m (n)direct-product SU m (n)/SU 2m (n) and extension to simply-laced g is clear. More general cases are left for future study. copyright Academic Prss, Inc. 1989

  5. Military Construction of the Defense Finance and Accounting Service Operations Facility, Columbus, Ohio

    National Research Council Canada - National Science Library

    Granetto, Paul

    1995-01-01

    The audit objectives were to determine whether the Defense Finance and Accounting Service Columbus Center properly planned and programmed the FY 1996 proposed military construction project and whether...

  6. Global (and Local) Analyticity for Second Order Operators Constructed from Rigid Vector Fields on Products of Tori

    OpenAIRE

    Tartakoff, David S.

    1994-01-01

    We prove global analytic hypoellipticity on a product of tori for partial differential operators which are constructed as rigid (variable coefficient) quadratic polynomials in real vector fields satisfying the H\\"ormander condition and where $P$ satisfies a `maximal' estimate. We also prove an analyticity result that is local in some variables and global in others for operators whose prototype is $$ P= \\left({\\partial \\over {\\partial x_1}}\\right)^2 + \\left({\\partial \\over {\\partial x_2}}\\righ...

  7. Studies on sustainability of simulated constructed wetland system for treatment of urban waste: Design and operation.

    Science.gov (United States)

    Upadhyay, A K; Bankoti, N S; Rai, U N

    2016-03-15

    New system configurations and wide range of treatability make constructed wetland (CW) as an eco-sustainable on-site approach of waste management. Keeping this view into consideration, a novel configured three-stage simulated CW was designed to study its performance efficiency and relative importance of plants and substrate in purification processes. Two species of submerged plant i.e., Potamogeton crispus and Hydrilla verticillata were selected for this study. After 6 months of establishment, operation and maintenance of simulated wetland, enhanced reduction in physicochemical parameters was observed, which was maximum in the planted CW. The percentage removal (%) of the pollutants in three-stage mesocosms was; conductivity (60.42%), TDS (67.27%), TSS (86.10%), BOD (87.81%), NO3-N (81.28%) and PO4-P (83.54%) at 72 h of retention time. Submerged macrophyte used in simulated wetlands showed a significant time dependent accumulation of toxic metals (p ≤ 0.05). P. crispus accumulated the highest Mn (86.36 μg g(-1) dw) in its tissue followed by Cr (54.16 μg g(-1) dw), Pb (31.56 μg g(-1) dw), Zn (28.06 μg g(-1) dw) and Cu (25.76 μg g(-1) dw), respectively. In the case of H. verticillata, it was Zn (45.29), Mn (42.64), Pb (22.62), Cu (18.09) and Cr (16.31 μg g(-1) dw). Thus, results suggest that the application of simulated CW tackles the water pollution problem more efficiently and could be exploited in small community level as alternative and cost effective tools of phytoremediation. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. Design, construction and operating experience of boilers at Wylfa power station

    Energy Technology Data Exchange (ETDEWEB)

    Razzell, R N [Wylfa Power Station, Central Electricity Generating Board, Gwynedd (United Kingdom)

    1988-07-01

    The report will describe the boilers, but will emphasise the problems encountered and the solutions. The boilers are 'once through' with start up drums. Some redundancy was provided but this advantage was lost due to downrating of gas temperature. The boilers are carbon steel suspended plattens (992 per reactor) tightly packed in the annular space between the core shielding and the spherical wall of the pressure vessel. This construction denies access to repair tube leaks. when a leak occurs the faulty platten has to be plugged off. This is done with the reactor at 60% power. The process will be described. Reactor 1 commenced operation in 1971, Reactor 2 in June 1971. Between 1972 and May 1984 21 leaks occurred which resulted in a major shutdown for investigation. This revealed the leaks were caused by gas flow induced vibration resulting in fretting of tubes in clips. Restraints and additional clamps were fitted. This has been successful but the modifications were extensive and in very difficult working conditions, the Reactor being shut down until May 1976. A family of leaks adjacent to personnel access ways commenced in Reactor 1 in 1975 which was later identified as erosion/corrosion on the water/steam side caused by the feed flow instability. This problem is common to both Reactors. Various modifications have been applied. Redistribution of feed flow using orifice plates and ferrules was only temporarily successful. Following extensive rig testing the feed water has been dosed with amino methyl proponal (AMP) since September 1983 with an immediate and sustained reduction in the leak rate. The amine provides protection through the steam/water phase. Rig testing continues to attain a better understanding of the erosion/corrosion. (author)

  9. Design, construction and operating experience of boilers at Wylfa power station

    International Nuclear Information System (INIS)

    Razzell, R.N.

    1988-01-01

    The report will describe the boilers, but will emphasise the problems encountered and the solutions. The boilers are 'once through' with start up drums. Some redundancy was provided but this advantage was lost due to downrating of gas temperature. The boilers are carbon steel suspended plattens (992 per reactor) tightly packed in the annular space between the core shielding and the spherical wall of the pressure vessel. This construction denies access to repair tube leaks. when a leak occurs the faulty platten has to be plugged off. This is done with the reactor at 60% power. The process will be described. Reactor 1 commenced operation in 1971, Reactor 2 in June 1971. Between 1972 and May 1984 21 leaks occurred which resulted in a major shutdown for investigation. This revealed the leaks were caused by gas flow induced vibration resulting in fretting of tubes in clips. Restraints and additional clamps were fitted. This has been successful but the modifications were extensive and in very difficult working conditions, the Reactor being shut down until May 1976. A family of leaks adjacent to personnel access ways commenced in Reactor 1 in 1975 which was later identified as erosion/corrosion on the water/steam side caused by the feed flow instability. This problem is common to both Reactors. Various modifications have been applied. Redistribution of feed flow using orifice plates and ferrules was only temporarily successful. Following extensive rig testing the feed water has been dosed with amino methyl proponal (AMP) since September 1983 with an immediate and sustained reduction in the leak rate. The amine provides protection through the steam/water phase. Rig testing continues to attain a better understanding of the erosion/corrosion. (author)

  10. The business and technical case for Continuous Commissioning(reg Trade Mark) for enhanced building operations. A case study: Alamo Community College District San Antonio, Texas, U.S.A

    Energy Technology Data Exchange (ETDEWEB)

    Verdict, Malcolm; Wei, Guanghua [Texas A and M Univ. System, College Station, TX (United States). Energy Systems Laboratory

    2005-07-01

    This paper provides both the business and technical cases for the 'Continuous Commissioning' of large [>25,000 square feet], buildings through a whole building diagnostic and HVAC optimization approach known as 'Continuous Commissioning'. 'Continuous Commissioning' is defined as the ongoing engineering process to resolve operating problems, improve comfort, optimize energy use and identify retrofits in existing buildings and central plant facilities. It is also known as 'building retro-commissioning' or 'building tune-up'. It involves a rigorous, whole-building, engineering evaluation of the heating and cooling systems to identify mechanical problems, inadequate or ineffective control strategies. Some of the most common problems are: 1) Improper calibration of sensors and metering, 2) inadequate control strategies for optimum operation and comfort, 3) incorrect scheduling of heating and cooling equipment, 4) lack of air and water-side economizer equipment, 5) inadequate building automation systems, and 6) inadequate operations and maintenance. The CC process, described in this paper, was successfully applied at Alamo Community College District (ACCD) in San Antonio, Texas, USA by the Energy Systems Laboratory (ESL), a part of the Texas A and M Univ. System. ACCD has multiple buildings on 4 campuses with total conditioned area of 2.35 Million square feet. ACCD's business approach was unique because the cost of conducting the CC process was financed as an Energy Cost Reduction Measure (ECRM) along with several energy efficiency retrofits.

  11. EOS: A project to investigate the design and construction of real-time distributed Embedded Operating Systems

    Science.gov (United States)

    Campbell, R. H.; Essick, Ray B.; Johnston, Gary; Kenny, Kevin; Russo, Vince

    1987-01-01

    Project EOS is studying the problems of building adaptable real-time embedded operating systems for the scientific missions of NASA. Choices (A Class Hierarchical Open Interface for Custom Embedded Systems) is an operating system designed and built by Project EOS to address the following specific issues: the software architecture for adaptable embedded parallel operating systems, the achievement of high-performance and real-time operation, the simplification of interprocess communications, the isolation of operating system mechanisms from one another, and the separation of mechanisms from policy decisions. Choices is written in C++ and runs on a ten processor Encore Multimax. The system is intended for use in constructing specialized computer applications and research on advanced operating system features including fault tolerance and parallelism.

  12. Co-operation an competition in the construction industry of the Netherlands

    NARCIS (Netherlands)

    Doree, Andries G.; Holmen, Elsebeth; Caerteling, Jasper; Greenwood, D

    2003-01-01

    In 2002, a Parliamentary Enquiry Committee exposed widespread collusion practices in the Dutch construction industry. The construction industry in the Netherlands is in turmoil and is seen as not living up to the standards that society requires. There seems to be a culture and an environment that

  13. Traffic condition with road upgrading during construction and operation stages based on level-of-service (LOS)

    Science.gov (United States)

    Tay, A. C.; Lee, H. H.

    2018-04-01

    In this study, traffic survey was done at signalized intersection of both ends of an upgrading road during morning and afternoon peak hours throughout construction period. The intersections of Tudan Road located at Miri City in Sarawak State, Malaysia were chosen as study sites. The aim of this research was to investigate the traffic condition for the signalized intersections of a R3 secondary road that being upgrading to standard U5 dual carriageway during peak hours for construction and operation stages. Data collected from these sites were analyzed according to Highway Capacity Manual (HCM) 2010. From the results, the level-of-services (LOS) of Kuala Baram By Pass Road intersection improved from Level F to Level E at operation stage for weekday during peak hours in the morning. LOS of Lutong-Kuala Baram Road intersection at construction stage were Level C during peak hours in the morning and Level D during peak hours in the afternoon for weekends. However, the LOS during both peak hours for weekends were projected to improve to Level B at the operation stage. It proved that the road construction has affected LOS, and this temporary issue can be solved after the upgraded road is in operation.

  14. Environmental impact assessment of a package type IFAS reactor during construction and operational phases: a life cycle approach.

    Science.gov (United States)

    Singh, Nitin Kumar; Singh, Rana Pratap; Kazmi, Absar Ahmad

    2017-05-01

    In the present study, a life cycle assessment (LCA) approach was used to analyse the environmental impacts associated with the construction and operational phases of an integrated fixed-film activated sludge (IFAS) reactor treating municipal wastewater. This study was conducted within the boundaries of a research project that aimed to investigate the implementation related challenges of a package type IFAS reactor from an environmental perspective. Along with the LCA results of the construction phase, a comparison of the LCA results of seven operational phases is also presented in this study. The results showed that among all the inputs, the use of stainless steel in the construction phase caused the highest impact on environment, followed by electricity consumption in raw materials production. The impact of the construction phase on toxicity impact indicators was found to be significant compared to all operational phases. Among the seven operational phases of this study, the dissolved oxygen phase III, having a concentration of ∼4.5 mg/L, showed the highest impact on abiotic depletion, acidification, global warming, ozone layer depletion, human toxicity, fresh water eco-toxicity, marine aquatic eco-toxicity, terrestrial eco-toxicity, and photochemical oxidation. However, better effluent quality in this phase reduced the eutrophication load on environment.

  15. Regulatory principles, criteria and guidelines for site selection, design, construction and operation of uranium tailings retention systems

    International Nuclear Information System (INIS)

    Coady, J.R.; Henry, L.C.

    1978-01-01

    Principles, criteria and guidelines developed by the Atomic Energy Control Board for the management of uranium mill tailings are discussed. The application of these concepts is considered in relation to site selection, design and construction, operation and decommissioning of tailings retention facilities

  16. 10 CFR Appendix N to Part 52 - Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FOR NUCLEAR POWER PLANTS Pt. 52, App. N Appendix N to Part 52—Standardization of Nuclear Power Plant...

  17. 10 CFR Appendix N to Part 50 - Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate...

    Science.gov (United States)

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Standardization of Nuclear Power Plant Designs: Permits To Construct and Licenses To Operate Nuclear Power Reactors of Identical Design at Multiple Sites N Appendix N... FACILITIES Pt. 50, App.N Appendix N to Part 50—Standardization of Nuclear Power Plant Designs: Permits To...

  18. 29 CFR 1926.1003 - Overhead protection for operators of agricultural and industrial tractors used in construction.

    Science.gov (United States)

    2010-07-01

    ... (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED) SAFETY AND HEALTH... possibility of operator injury resulting from overhead hazards such as flying and falling objects, and at the... used in construction work (see 29 CFR 1926.1002(b) and (j)). In the case of machines to which 29 CFR...

  19. Main trends in scientific-research works during construction and operation of uranium mines and open cuts

    International Nuclear Information System (INIS)

    Mosinets, V.N.

    1993-01-01

    Consideration is given to main trends in research works during construction and operation of uranium mines and open cuts of Priargunsky mine-chemical association. Develops and introduced principally new design solutions and technologies in the field of open mining, underground mining, as well as in-situ and heap leaching, are described

  20. Design,construction and commissioning of a cylinder of double-sided silicon micro-strips detectors for the Star experiment at RHIC; Developpement et mise en oeuvre de detecteurs silicium a micropistes pour l'experience star

    Energy Technology Data Exchange (ETDEWEB)

    Guedon, M

    2005-05-15

    This study has been performed in the frame of quark gluon plasma physics research in the STAR experiment at RHIC. It deals with the design, the construction and the commissioning of a barrel of silicon-strip detectors (SSD). Added to the Silicon Vertex Tracker (SVT) of the STAR detector, it extends the capabilities of track reconstruction for charged particles emitted in ultra-relativistic heavy-ion collisions. It also contributes to the general study of the quark-gluon plasma production undertaken at STAR. The SSD is a cylinder of 1 m long and of 23 cm radius, and it is composed of 320 compact identical modules. Each module includes one double-sided silicon micro-strip detector, 12 readout chips ALICE 128C, 12 TAB ribbons, 2 COSTAR control chips and 2 hybrids supporting all the components. The document explains why the SSD is an important and relevant element, and justifies the technological choices as well as their validation by in-beam characterization. All component functionalities, characteristics and test procedures are presented. The data and test results are stored in a database for tracing purpose. Component and module production is described. Two parallel studies have been performed, analysed and described. One on the temperature dependence of the module performances and the other one on the optimal adjustments of the analogue blocks inside the ALICE 128C chip. The SSD installation on the RHIC site as well as the commissioning are presented together with the first data takings. (author)

  1. Design,construction and commissioning of a cylinder of double-sided silicon micro-strips detectors for the Star experiment at RHIC; Developpement et mise en oeuvre de detecteurs silicium a micropistes pour l'experience star

    Energy Technology Data Exchange (ETDEWEB)

    Guedon, M

    2005-05-15

    This study has been performed in the frame of quark gluon plasma physics research in the STAR experiment at RHIC. It deals with the design, the construction and the commissioning of a barrel of silicon-strip detectors (SSD). Added to the Silicon Vertex Tracker (SVT) of the STAR detector, it extends the capabilities of track reconstruction for charged particles emitted in ultra-relativistic heavy-ion collisions. It also contributes to the general study of the quark-gluon plasma production undertaken at STAR. The SSD is a cylinder of 1 m long and of 23 cm radius, and it is composed of 320 compact identical modules. Each module includes one double-sided silicon micro-strip detector, 12 readout chips ALICE 128C, 12 TAB ribbons, 2 COSTAR control chips and 2 hybrids supporting all the components. The document explains why the SSD is an important and relevant element, and justifies the technological choices as well as their validation by in-beam characterization. All component functionalities, characteristics and test procedures are presented. The data and test results are stored in a database for tracing purpose. Component and module production is described. Two parallel studies have been performed, analysed and described. One on the temperature dependence of the module performances and the other one on the optimal adjustments of the analogue blocks inside the ALICE 128C chip. The SSD installation on the RHIC site as well as the commissioning are presented together with the first data takings. (author)

  2. Network design and operational modelling for construction green supply chain management

    Directory of Open Access Journals (Sweden)

    Pengfei Zhou Dong Chen

    2013-01-01

    Full Text Available Based on studying organizational structure of Construction Green Supply Chain Management (CGSCM, a mathematical programming model of CGSCM was proposed. The model aimed to maximize the aggregate profits of normalized construction logistics, the reverse logistics and the environmental performance. Numerical experiments show that the proposed approach can improve the aggregate profit effectively. In addition, return ratio, subsidies from governmental organizations, and environmental performance were analyzed for CGSCM performance. Herein, the proper return, subsidy and control strategy could optimize construction green supply chain.

  3. Overview of the design, construction, and operation of interstate liquid petroleum pipelines.

    Energy Technology Data Exchange (ETDEWEB)

    Pharris, T. C.; Kolpa, R. L.

    2008-01-31

    Geophysical Institute/International Arctic Research Center, both located in Fairbanks (Barboza and Trebelhorn 2001), available electronically at http://www.gi.alaska.edu/services/library/pipeline.html codes. The Association of Oil Pipe Lines (AOPL) and the American Petroleum Institute (API) jointly provide an overview covering the life cycle of design, construction, operations, maintenance, economic regulation, and deactivation of liquid pipelines (AOPL/API 2007).

  4. The legal position of the operator and the constructor as regards construction of a nuclear power plant

    International Nuclear Information System (INIS)

    Sartorelli, Claudio

    1976-01-01

    Implementation of the Italian nuclear power programme requires that ENEL (the Italian State Electricity Agency) should solve a series of problems which are not only political, technical and financial, but also legal. The latter include the different positions held by constructors and operators in the nuclear law field. Although the operator must necessarily entrust construction work by contract to specialized agencies, the constructor as a person proper is completely ignored by the legislation in force, while the operator, as the holder of the construction licence is responsible with regard to all the provisions concerning controls, tests, inspections, etc. In recent years ENEL has frequently concluded ''turnkey'' contracts, but in future, given the desirability of diversifying the orders, ENEL may adopt a different policy, and negotiate different contracts with the suppliers of various components. (N.E.A.)

  5. Environmental assessment for the construction, operation, and decommissioning of the Waste Segregation Facility at the Savannah River Site

    International Nuclear Information System (INIS)

    1998-01-01

    This Environmental Assessment (EA) has been prepared by the Department of Energy (DOE) to assess the potential environmental impacts associated with the construction, operation and decontamination and decommissioning (D ampersand D) of the Waste Segregation Facility (WSF) for the sorting, shredding, and compaction of low-level radioactive waste (LLW) at the Savannah River Site (SRS) located near Aiken, South Carolina. The LLW to be processed consists of two waste streams: legacy waste which is currently stored in E-Area Vaults of SRS and new waste generated from continuing operations. The proposed action is to construct, operate, and D ampersand D a facility to process low-activity job-control and equipment waste for volume reduction. The LLW would be processed to make more efficient use of low-level waste disposal capacity (E-Area Vaults) or to meet the waste acceptance criteria for treatment at the Consolidated Incineration Facility (CIF) at SRS

  6. Under niche construction: an operational bridge between ecology, evolution, and ecosystem science

    NARCIS (Netherlands)

    Matthews, B.; De Meester, L.; Jones, C.G.; Ibelings, B.W.; Bouma, T.J.; Nuutinen, V.; van de Koppel, J.; Odling-Smee, J.

    2014-01-01

    All living organisms modify their biotic and abiotic environment. Niche construction theory posits that organism-mediated modifications to the environment can change selection pressures and influence the evolutionary trajectories of natural populations. While there is broad support for this

  7. Long-term Stabilization of Disturbed Slopes Resulting from Construction Operations

    Science.gov (United States)

    2018-01-01

    Highway construction disturbs soil, which must be stabilized to prevent migration of soil particles into water bodies. Stabilization is enforced by law, regulation, and a permit system. Stabilization is most efficiently attained by reestablishment of...

  8. Smooth Operator - Mobile Information Technology for Improved Flow at the Construction Site

    DEFF Research Database (Denmark)

    Tambo, Torben

    2010-01-01

    is used; mobility is classified as remote, local or micro. Furthermore an extensive literature study is employed along with both market screening for systems and case studies of companies adopting as well as rejecting the technology. Both within research communities, software manufacturers......Mobile information technology (IT) seems an ideal innovation to promote effectiveness of the construction process, particularly at the construction site; research has over the last 15 years focused on solutions, potentials and barriers with this field. This paper aim at the duality between research...... and industry for an updated and forward looking comprehension, and view of tendencies, of the roles and potentials of mobile IT at the construction site including potential for further research. Qualitative and interpretive methodology inspired by information systems and sociology of research and construction...

  9. Socio-demographic and economic aspects of nuclear power plant construction and operation

    International Nuclear Information System (INIS)

    1984-01-01

    The proceedings contain 10 papers of which 9 have been inputted in INIS. The papers deal with the economic, social and ecological consequences of the construction of nuclear power plants. Various approaches are listed to the economic evaluation of the said consequences. The question is discussed of the efficiency of investments for the construction of nucliear power plants as are the probiems of sitting large projects. (E.S.)

  10. The Industry Commission inquiry into charitable organisations.

    Science.gov (United States)

    Suter, K

    1996-01-01

    The Industry Commission has carried out Australia's largest inquiry into charities. It was, from the point of view of charities, an unsatisfactory operation, all the more so since it was not clear why the task had been given to the commission. This article examines the commission's work in three ways: the overall relationship between government and charities; the commission's proposed major reforms; and the minor reforms.

  11. The Design, Construction and Operation of a 75 kW Two-Stage Gasifier

    DEFF Research Database (Denmark)

    Henriksen, Ulrik Birk; Ahrenfeldt, Jesper; Jensen, Torben Kvist

    2003-01-01

    The Two-Stage Gasifier was operated for several weeks (465 hours) and of these 190 hours continuously. The gasifier is operated automatically unattended day and night, and only small adjustments of the feeding rate were necessary once or twice a day. The operation was successful, and the output...... as expected. The engine operated well on the produced gas, and no deposits were observed in the engine afterwards. The bag house filter was an excellent and well operating gas cleaning system. Small amounts of deposits consisting of salts and carbonates were observed in the hot gas heat exchangers. The top...

  12. The construction of power grid operation index system considering the risk of maintenance

    Science.gov (United States)

    Tang, Jihong; Wang, Canlin; Jiang, Xinfan; Ye, Jianhui; Pan, Feilai

    2018-02-01

    In recent years, large-scale blackout occurred at home and abroad caused widespread concern about the operation of the grid in the world, and the maintenance risk is an important indicator of grid safety. The barrier operation of the circuit breaker exists in the process of overhaul of the power grid. The operation of the different barrier is of great significance to the change of the power flow, thus affecting the safe operation of the system. Most of the grid operating status evaluation index system did not consider the risk of maintenance, to this end, this paper from the security, economy, quality and cleanliness of the four angles, build the power grid operation index system considering the risk of maintenance.

  13. Design, Construction and Commissioning of the CMS Tracker at CERN and Proposed Improvements for Detectors at the Future International Linear Collider

    CERN Document Server

    Bergauer, T

    The CMS (Compact Muon Solenoid) detector is a huge particle physics experiment located at one of the four proton-proton interaction points of the Large Hadron Collider (LHC) at CERN, the European Organization for Nuclear Research (Geneva, Switzerland). With 27 km circumference it is the not only the largest particle accelerator in size, but with a center of mass energy of 2x7 TeV it will also set the world record in terms of energy. The inner tracking system of the CMS experiment has a diameter of 2.4 m and a length of 5.4 m and is representing the largest silicon tracker ever built. About 15,000 detector modules consisting of more than 24,000 silicon sensors create a silicon area of 206 m2 to detect charged particles from proton collisions. They are placed on a rigid carbon fibre structure in the center of the experiment, and have to operate reliably within a harsh radiation environment and the working conditions of a 3.8 Tesla solenoid magnetic field at -10 degree C temperature. This thesis was conducted ...

  14. Construction and initial operation of MHD PbLi facility at UCLA

    International Nuclear Information System (INIS)

    Kunugi, T.; Yokomine, T.; Ueki, Y.; Smolentsev, S.; Li, F.-C.; Sketchley, T.; Abdou, M.A.; Yuki, K.

    2014-01-01

    We review current accomplishments in Task 1-3 'Flow Control and Thermofluid Modeling' of the Japan-US 'TITAN' collaboration program. Our task focuses on experimental activities and also computer modeling of magnetohydrodynamic flows and heat and mass transfer of electrically conducting fluids under conditions relevant to fusion blankets. Since our task started, major efforts were taken to design, construct and test a new magnetohydrodynamic lead-lithium (PbLi) loop at UCLA, to accumulate the PbLi handling technology, and to develop a high-temperature ultrasonic Doppler velocimetry and a differential-pressure measurement system for PbLi flows. In the present paper, the loop construction, the electromagnetic pump performance test, our on-going experiments with the constructed loop are described. (author)

  15. The history of the construction und operation of the KNK II German Fast Breeder Power Plant

    International Nuclear Information System (INIS)

    Marth, W.

    1993-08-01

    This report describes the German KNK fast breeder project from its beginnings in 1957 until permanent shutdown in 1991. The initial design provided for a sodium-cooled, but thermal reactor. Already during the commissioning of KNK I on the premises of the Karlsruhe Nuclear Research Center modification into a fast nuclear power plant was decided. Considerable difficulties in licensing had to be overcome. KNK II reached high burnup values in the fuel elements and closing of the fuel cycle was achieved. A number of technical problems concerning individual components are described in detail. After the politically motivated discontinuation of the SNR 300 fast breeder project at Kalkar, KNK II was shut down for good in August 1991. (orig.) [de

  16. The History of the Construction and Operation of the German KNK II Fast Breeder Power Plant

    International Nuclear Information System (INIS)

    Marth, W.

    1994-11-01

    The report gives a historical review of the German KNK fast breeder project, from its beginnings in 1957 up to permanent plant shutdown in 1991. The original design was for the sodium cooled thermal reactor KNK I, which was commissioned on the premises of the Karlsruhe Nuclear Research Center. The conversion into a fast nuclear power plant however was a process, which had to overcome considerable licensing difficulties. KNK II attained high fuel element burnups, and the completion of the fuel cycle was achieved. Various technical problems encountered in specific components are described in detail. After the termination of the SNR 300 fast breeder project in Kalkar for political reasons, KNK II was shutdown in August 1991

  17. Construction of Fuzzy Sets and Applying Aggregation Operators for Fuzzy Queries

    DEFF Research Database (Denmark)

    Hudec, Miroslav; Sudzina, Frantisek

    Flexible query conditions could use linguistic terms described by fuzzy sets. The question is how to properly construct fuzzy sets for each linguistic term and apply an adequate aggregation function. For construction of fuzzy sets, the lowest value, the highest value of attribute...... and the distribution of data inside its domain are used. The logarithmic transformation of domains appears to be suitable. This way leads to a balanced distribution of tuples over fuzzy sets. In addition, users’ opinions about linguistic terms as well as current content in database are merged. The second investigated...

  18. Trends in the design, construction and operation of green roofs to improve the rainwater quality. State of the art

    Directory of Open Access Journals (Sweden)

    Jair Andrés Morales Mojica

    2017-07-01

    Full Text Available The green roofs appear as technology for the improvement water quality. This article identifies trends in the conditions of design, construction and operation of green roofs, which aim is to improve the quality of rainwater. A literature review was carried out in order to collect 45 original research papers from databases as Scopus, Science Direct, and Redalyc. From the information collected trends in increments and reductions in the concentrations of the main water quality parameters, seasons of the year with the best results, types of green roofs , types of substrate and most common components, construction trends (dimensions, inclination, Materials and layers and vegetation used in these systems have been determined. The results show that green roofs have the ability to neutralize acid rain. Extensive type roofs are the ones most commonly used, due to its characteristics of construction, functionality and low maintenance requirements.

  19. IMPROVED METHOD OF DETERMINATION OF ECONOMIC EFFICIENCY OF CONSTRUCTION AND OPERATION OF HIGH SPEED MAINLINE IN UKRAINE

    Directory of Open Access Journals (Sweden)

    YU. S. Barash

    2014-01-01

    Full Text Available Purpose. To develop an advanced methodology and formulate the measures concerning the definition of economic efficiency of high-speed movement organization taking into account the operating experience of rapid transportations in Ukraine, travel time, number of stops on the route, schedule and the demand for these transportations. Methodology. The economic feasibility for appropriateness of high-speed movement organization in Ukraine is an investment project, which involves step-by-step money investment to the construction. To solve such problems one uses net present value, which UZ or newly created companies can get during the project realization and after its completion. Findings. On the basis of obtained studies one can state that the methodology of complex determination of construction efficiency and high-speed passenger trains operation taking into account the cost of infrastructure, rolling stock, impact of environmental factors, etc. was developed in the article. Originality. We propose a scientific approach to determine the economic efficiency of the construction and high-speed main lines operation. This approach, unlike the existing one, includes the improved principles of determining the passenger traffic, the cost of high-speed mainline construction, the number of rolling stock; optimizes income and expenditure calculations in the context of competitive advantages and impact of the external factors on the company. For the first time it was taken into account the transit flow of passengers departing from CIS countries to the vacation in the Crimea, the Carpathians, Odessa and Lviv regions. The account of these factors increases the feasibility of administrative decisions concerning ensuring the efficiency of high-speed traffic functioning. Practical value. The proposed methodology and the research results allowed determining the construction reasonability of high-speed mainline for the passenger trains with a speed at least250 km/h in

  20. Environmental assessment for the construction and operation of waste storage facilities at the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-06-01

    DOE is proposing to construct and operate 3 waste storage facilities (one 42,000 ft{sup 2} waste storage facility for RCRA waste, one 42,000 ft{sup 2} waste storage facility for toxic waste (TSCA), and one 200,000 ft{sup 2} mixed (hazardous/radioactive) waste storage facility) at Paducah. This environmental assessment compares impacts of this proposed action with those of continuing present practices aof of using alternative locations. It is found that the construction, operation, and ultimate closure of the proposed waste storage facilities would not significantly affect the quality of the human environment within the meaning of NEPA; therefore an environmental impact statement is not required.

  1. 77 FR 71454 - Crow Butte Resources, Inc. License SUA-1534, License Amendment To Construct and Operate Marsland...

    Science.gov (United States)

    2012-11-30

    ..., Washington, DC 20555-0001. Telephone: 301-415-6563; fax number: 301- 415-5369; email: Thomas[email protected] Regulatory Commission. Annette L. Vietti-Cook, Secretary of the Commission. Attachment 1--General Target...

  2. 33 CFR 148.725 - What are the design, construction and operational criteria?

    Science.gov (United States)

    2010-07-01

    ..., DEPARTMENT OF HOMELAND SECURITY (CONTINUED) DEEPWATER PORTS DEEPWATER PORTS: GENERAL Environmental Review... the basis of how well they: (a) Reflect the use of best available technology in design, construction... plans to minimize the possibility and consequences of pollution incidents such as spills and discharges...

  3. Environmental Assessment for the Proposed Construction and Operation of New Vehicle Maintenance Facility

    Science.gov (United States)

    2007-08-01

    reasonably foreseeable future actions regardless of what agency (federal or non-federal) or person undertakes such actions” (40 CFR 1508.7). Cumulative... clubhouse /pool and playgrounds. MFH 734,789 and Clughouse 22,500 sf (Under Construction) 70,355 757,298 Yes (05) 05 1500 Army Aviation Support

  4. Innovation of construction in the Dutch railways : Lessons from inter-organizational co-operation

    NARCIS (Netherlands)

    van der Veen, Bas; Voordijk, Hans; Dorée, André; Akintoye, Akintola

    2001-01-01

    Traditionally innovation in the construction industry is analysed at an industry-level. This results in generalist observations on the low level of innovation when compared to other industries and the identification of factors that, on industry level, hamper innovation. With these factors in mind

  5. Development, Construction, and Operation of a Multisample Volumetric Apparatus for the Study of Gas Adsorption Equilibrium

    Science.gov (United States)

    Ribeiro, Rui P. P. L.; Silva, Ricardo J. S.; Esteves, Isabel A. A. C.; Mota, Jose´ P. B.

    2015-01-01

    The construction of a simple volumetric adsorption apparatus is highlighted. The setup is inexpensive and provides a clear demonstration of gas phase adsorption concepts. The topic is suitable for undergraduate chemistry and chemical engineering students. Moreover, this unit can also provide quantitative data that can be used by young researchers…

  6. Transparency, market operation and trust in the Dutch construction industry: an exploratory study

    NARCIS (Netherlands)

    Graafland, Johan; Nijhof, A.H.J.

    2007-01-01

    After the discovery of illegal price agreements in the Dutch construction industry, the government and major players in the sector have initiated a transition process towards more professional commercial relations. In the transition process transparency plays an important part, as it is a

  7. A Duration Prediction Using a Material-Based Progress Management Methodology for Construction Operation Plans

    Directory of Open Access Journals (Sweden)

    Yongho Ko

    2017-04-01

    Full Text Available Precise and accurate prediction models for duration and cost enable contractors to improve their decision making for effective resource management in terms of sustainability in construction. Previous studies have been limited to cost-based estimations, but this study focuses on a material-based progress management method. Cost-based estimations typically used in construction, such as the earned value method, rely on comparing the planned budget with the actual cost. However, accurately planning budgets requires analysis of many factors, such as the financial status of the sectors involved. Furthermore, there is a higher possibility of changes in the budget than in the total amount of material used during construction, which is deduced from the quantity take-off from drawings and specifications. Accordingly, this study proposes a material-based progress management methodology, which was developed using different predictive analysis models (regression, neural network, and auto-regressive moving average as well as datasets on material and labor, which can be extracted from daily work reports from contractors. A case study on actual datasets was conducted, and the results show that the proposed methodology can be efficiently used for progress management in construction.

  8. Research on the application of PPP model in the Chinese construction and operation of new energy vehicle charging facilities

    Science.gov (United States)

    Zhu, Liping

    2017-05-01

    New energy car charging equipment is the development and popularization of new energy vehicles. It has the nature of quasi-public goods. Due to the large number of construction projects, wide distribution, big investment, it needs huge sums of money. PPP mode is a new financing model and has the inherent driving force to lead the idea the technology and the system innovation. The government and the social subject cooperate on the basis of the spirit of contract thus achieve benefit sharing. This mode effectively improve the operation of new energy vehicle charging facilities operating efficiency

  9. Gas Reactor International Cooperative Program. Interim report. Construction and operating experience of selected European Gas-Cooled Reactors

    International Nuclear Information System (INIS)

    1978-09-01

    The construction and operating experience of selected European Gas-Cooled Reactors is summarized along with technical descriptions of the plants. Included in the report are the AVR Experimental Pebble Bed Reactor, the Dragon Reactor, AGR Reactors, and the Thorium High Temperature Reactor (THTR). The study demonstrates that the European experience has been favorable and forms a good foundation for the development of Advanced High Temperature Reactors

  10. SPS microwave subsystem potential impacts and benefits. [environmental and societal effects of Solar Power System construction and operation

    Science.gov (United States)

    Dickinson, R. M.

    1978-01-01

    The paper examines the possible environmental and societal effects of the construction, installation, and operation of the space end and earth end of the microwave power transmission subsystem that delivers satellite power system (SPS) energy (at about 5 GW per beam) to the power grid on earth. The intervening propagation medium near the earth is also considered. Separate consideration is given to the spacecraft transmitting array, propagation in the ionosphere, and the ground-based rectenna. Radio frequency interference aspects are also discussed.

  11. An overview of the QA principles and practices applied to the design, construction, commissioning and bringing into service of an intermediate-level waste encapsulation plant at BNFL Sellafield

    International Nuclear Information System (INIS)

    Lake, M.W.

    1989-01-01

    This paper describes the arrangements adopted by BNFL to ensure that a new ILW Encapsulation Plant Project is brought from project conception through to commercial operation within a QA system which complies with the appropriate standards and includes the following: the role of the QA function within BNFL Engineering; the organization of the commissioning process into a formal QA system to satisfy the requirements of the Nuclear Site License; and the preparatory work carried out by the Site's QA organization in the management of R and D, the selection and evaluation of raw material suppliers, and the bringing together of large numbers of particularly complex activities and differing organizations to provide assurance of quality of the ultimate product. The author presents an explanation of the arrangements adopted by BNFL to monitor the achievements of quality objectives and to ensure a comprehensive audit programme is maintained

  12. Molr - A delegation framework for accelerator commissioning

    CERN Document Server

    Valliappan, Nachiappan

    2017-01-01

    Accelerator commissioning is the process of preparing an accelerator for beam operations. A typical commissioning period at CERN involves running thousands of tests on many complex systems and machinery to ensure smooth beam operations and correct functioning of the machine protection systems. AccTesting is a software framework which helps orchestrate the commissioning of CERN’s accelerators and it’s equipment systems. This involves running and managing tests provided by various commissioning tools and analyzing their outcomes. Currently, AccTesting only supports a specific set of commissioning tools. In this project, we aim to widen the spectrum of commissioning tools supported by AccTesting by developing a generic and programmable integration framework called Molr, which would enable the integration of more commissioning tools with AccTesting. In this report, we summarize the work done during the summer student project and lay out a brief overview of the current status and next steps for Molr.

  13. Earth-covered storage of LPG - Development, construction and operating experiences

    International Nuclear Information System (INIS)

    Schuldt, P.; Grote, G.

    1990-01-01

    The paper describes the planning, approval procedures, design, fabrication, site-assembling and the testing of liquefied petroleum gas storage tanks. The practical experience after three years of operation is reported. 8 figs

  14. Expanding transportation systems management and operations (TSM&O) from planning to construction primer.

    Science.gov (United States)

    2015-12-01

    The Florida Department of Transportation (FDOT) has initiated business plans to promote the Transportation : Systems Management and Operations (TSM&O) program throughout the State. TSM&O is traditionally managed : by traffic engineers that focus on o...

  15. Construction of two-dimensional Schrodinger operator with given scattering amplitude at fixed energy

    International Nuclear Information System (INIS)

    Novikov, R.G.

    1986-01-01

    The classical necessary properties of the scattering amplitude (reciprocity and unitarity) are, provided its L 2 norm is small, sufficient for the existence of a two-dimensional Schrodinger operator with the given scattering amplitude at fixed energy

  16. Stability of Quantum Loops and Exchange Operations in the Construction of Quantum Computation Gates

    International Nuclear Information System (INIS)

    Bermúdez, D; Delgado, F

    2017-01-01

    Quantum information and quantum computation is a rapidly emergent field where quantum systems and their applications play a central role. In the gate version of quantum computation, the construction of universal quantum gates to manipulate quantum information is currently an intensive arena for quantum engineering. Specific properties of systems should be able to reproduce such idealized gates imitating the classically inspired computational gates. Recently, for magnetic systems driven by the bipartite Heisenberg-Ising model a universal set of gates has been realized, an alternative easy design for the Boykin set but using the Bell states as grammar. Exact control can be then used to construct specific prescriptions to achieve those gates. Physical parameters impose a challenge in the gate control. This work analyzes, based on the worst case quantum fidelity, the associated instability for the proposed set of gates. An strong performance is found in those gates for the most of quantum states involved. (paper)

  17. Quality assurance during site construction. Pt. 6

    International Nuclear Information System (INIS)

    Schwarz, N.

    1980-01-01

    Scope of 'Site Construction concerning Electrical Equipment' (Installation, erection, commissioning, operation): tasks and organization of Siemens-Field Services Division; organization on site; receiving, incoming inspection and storage of material; installation, erection; (drawings, instructions, documents / execution of installation / personnel qualification). Non conformance and corrective actions; quality records; internal audits. (orig.)

  18. Theater of Operations Construction in the Desert: A Handbook of Lessons Learned in the Middle East

    Science.gov (United States)

    1981-01-01

    concentration. 7. When using natural desert or beach pavements (calcrete duricrusts ) for coarse aggregate sources, discard the top 1 ft because it is most...profile comprises a mountain duricrusts ; unsuitable construction and a piedmont plain. Although such a P.G. Fookes materials - e.g. some silts, sands...surface, where for stops when sand and silts are damp; " duricrust ". The latter is often, but not example layers of fibrous gypsum can capillary moisture

  19. Design options for HLW repository operation technology. (4) Shotclay technique for seamless construction of EBS

    International Nuclear Information System (INIS)

    Kobayashi, Ichizo; Fujisawa, Soh; Nakajima, Makoto; Toida, Masaru; Nakashima, Hitoshi; Asano, Hidekazu

    2011-01-01

    The shotclay method is construction method of the high density bentonite engineered barrier by spraying method. Using this method, the dry density of 1.6 Mg/m 3 , which was considered impossible with the spray method, is achieved. In this study, the applicability of the shotclay method to HLW bentonite-engineered barriers was confirmed experimentally. In the tests, an actual scale vertical-type HLW bentonite-engineered barrier was constructed. This was a bentonite-engineered barrier with a diameter of 2.22 m and a height of 3.13 m. The material used was bentonite with 30% silica sand, and water content was adjusted by mixing chilled bentonite with powdered ice before thawing. Work progress was 11.2 m 3 and the weight was 21.7 Mg. The dry density of the entire buffer was 1.62 Mg/m 3 , and construction time was approximately 8 hours per unit. After the formworks were removed, the core and block of the actual scale HLW bentonite-engineered barrier were sampled to confirm homogeneity. As a result, homogeneity was confirmed, and no gaps were observed between the formwork and the buffer material and between the simulated waste and the buffer material. The applicability to HLW of the shotclay method has been confirmed through this examination. (author)

  20. Commissioning plans for SSC linac

    International Nuclear Information System (INIS)

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  1. Hungry Horse Mitigation Plan; Fisheries Mitigation Plan for Losses Attributable to the Construction and Operation of Hungry Horse Dam, 1990-2003 Technical Report.

    Energy Technology Data Exchange (ETDEWEB)

    Fraley, John J.; Marotz, Brian L. (Montana Department of Fish, Wildlife and Parks, Helena, MT); DosSantos, Joseph M. (Confederated Salish and Kootenai Tribes of the Flathead Nation, Pablo, MT)

    2003-04-01

    In this document we present fisheries losses, mitigation alternatives, and recommendations to protect, mitigate, and enhance resident fish and aquatic habitat affected by the construction and operation of Hungry Horse Dam. This plan addresses six separate program measures in the 1987 Columbia Basin Fish and Wildlife Program. We designed the plan to be closely coordinated in terms of dam operations, funding, and activities with the Kerr Mitigation Plan presently before the Federal Energy Regulatory Commission. This document represents a mitigation plan for consideration by the Northwest Power Planning Council process; it is not an implementation plan. Flathead Lake is one of the cleanest lakes of its size in the world. The exceptional water quality and unique native fisheries make the Flathead Lake/River system extremely valuable to the economy and quality of life in the basin. The recreational fishery in Flathead Lake has an estimated value of nearly eight million dollars annually. This mitigation process represents our best opportunity to reduce the impacts of hydropower in this valuable aquatic system and increase angling opportunity. We based loss estimates and mitigation alternatives on an extensive data base, agency reports, nationally and internationally peer-reviewed scientific articles, and an innovative biological model for Hungry Horse Reservoir and the Flathead River. We conducted an extensive, 14-month scoping and consultation process with agency representatives, representatives of citizen groups, and the general public. This consultation process helped identify issues, areas of agreement, areas of conflict, and advantages and disadvantages of mitigation alternatives. The results of the scoping and consultation process helped shape our mitigation plan. Our recommended plan is based firmly on principles of adaptive management and recognition of biological uncertainty. After we receive direction from the NPPC, we will add more detailed hypotheses and

  2. Appendix VI: KHNP staffing plan of construction site office: ULCHIN 5 and 6 construction project (ROK)

    International Nuclear Information System (INIS)

    2008-01-01

    KHNP, as an owner/operator organization, is responsible for all project activities including design, procurement, construction, and commissioning, for Korea's nuclear power plant (NPP) construction projects. Four separate functional offices of KHNP are set up to complete the construction management work. These offices are (1) home office, (2) field construction office, (3) field quality assurance office, and (4) field startup/commissioning office. This paper presents a staffing plan for the field construction office starting initial project implementation to final turnover to operations stages. It is recognized that the plan may not be applicable to other utility situations in terms of project management of site activity depending upon how the overall project contract is structured

  3. Final Environmental Assessment for the construction and operation of an office building at the Stanford Linear Accelerator Center. Part 2

    International Nuclear Information System (INIS)

    1995-08-01

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA), DOE/EA-1107, analyzing the environmental effects relating to the construction and operation of an office building at the Stanford Linear Accelerator Center (SLAC). SLAC is a national facility operated by Stanford University, California, under contract with DOE. The center is dedicated to research in elementary particle physics and in those fields that make use of its synchrotron facilities. The objective for the construction and operation of an office building is to provide adequate office space for existing SLAC Waste Management (WM) personnel, so as to centralize WM personnel and to make WM operations more efficient and effective. Based on the analyses in the EA, the DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment within the meaning of the National Environmental Policy Act of 1969 (NEPA). Therefore, the preparation of an Environmental Impact Statement is not required. This report contains the Environmental Assessment, as well as the Finding of No Significant Impact (FONSI)

  4. SUBSURFACE CONSTRUCTION AND DEVELOPMENT ANALYSIS

    International Nuclear Information System (INIS)

    N.E. Kramer

    1998-01-01

    The purpose of this analysis is to identify appropriate construction methods and develop a feasible approach for construction and development of the repository subsurface facilities. The objective of this analysis is to support development of the subsurface repository layout for License Application (LA) design. The scope of the analysis for construction and development of the subsurface Repository facilities covers: (1) Excavation methods, including application of knowledge gained from construction of the Exploratory Studies Facility (ESF). (2) Muck removal from excavation headings to the surface. This task will examine ways of preventing interference with other subsurface construction activities. (3) The logistics and equipment for the construction and development rail haulage systems. (4) Impact of ground support installation on excavation and other construction activities. (5) Examination of how drift mapping will be accomplished. (6) Men and materials handling. (7) Installation and removal of construction utilities and ventilation systems. (8) Equipping and finishing of the emplacement drift mains and access ramps to fulfill waste emplacement operational needs. (9) Emplacement drift and access mains and ramps commissioning prior to handover for emplacement operations. (10) Examination of ways to structure the contracts for construction of the repository. (11) Discussion of different construction schemes and how to minimize the schedule risks implicit in those schemes. (12) Surface facilities needed for subsurface construction activities

  5. Safety Commission databases support

    CERN Document Server

    Petit, S; CERN. Geneva. TS Department

    2005-01-01

    A collaboration project between the Safety Commission (SC) and the Controls, Safety and Engineering databases group (TS/CSE) started last year. The aim of this collaboration is to transfer several SC applications from their local environments onto the D7i-MTF EDMS framework, for which the TS/CSE group is responsible. Different domains of activity and projects have been defined in the areas of equipment management, safety inspections, accidents and risks management. Priorities have been established in collaboration with SC. This paper presents the new Safety Inspections Management system (SIM) which will be put in production before the summer 2005 and reviews the constraints of both the users and the development and operational framework that needed to be taken into account. The technical solutions adopted to assure a successful production start-up and operation of the SIM system are described. Progress on other on-going projects and plans for the next year are also reported.

  6. Backfitting possibilities of process instrumentation during planning, construction or operation of nuclear power plants

    International Nuclear Information System (INIS)

    Kaiser, G.E.; Schemmel, R.R.; Warren, H.D.

    1985-01-01

    The necessity for backfitting existing C and I equipment in nuclear power plants arises as a result of new licensing requirements being imposed or through a need for improved performance as experience with operating plants becomes available. These changes arise either because additional process variables need to be monitored; improved sensors need to be installed (to increase safety or operating margin); more directly sense the processes; or to address concerns in signal conditioning, control algorithms, control system strategy, or safety system design. This paper discusses examples of backfitting experiences on existing plants and some being developed for future improvements

  7. Constructing an Evaluation Framework for Eco-Museum Operations-Management Performance, Based on the Case of Jhushan, Taiwan

    Directory of Open Access Journals (Sweden)

    Kuo-Wei Hsu

    2018-06-01

    Full Text Available The bamboo-art industry in Taiwan’s Jhushan Township is inseparable from local life. In the face of local industrial-development difficulties in smaller towns, the Taiwan government aimed to achieve a range of (redevelopment goals using eco-museums as collaboration platforms and required such museums to combine their operations management with cultural preservation, local industrial development, and local residents’ goals. As such, the likely future performance of such operations management has emerged as a crucially important factor in decision-making about whether such museums should be constructed. This study, therefore, reviews the relevant literature on the operations-management performance of museums, with special attention to eco-museums, and proposes an operations-management performance measurement framework for eco-museums based on that review and a two-stage questionnaire administered to experts. The first stage utilized the Fuzzy Delphi Method, which focuses on impact factors, and the second, the Analytica Network Process Method, deals with performance factors. The results indicate that the key impacts on the performance of eco-museums and their operations management were, in order of importance, (1 community symbiosis, (2 cultural inheritance, and (3 regional revitalization. The preservation of cultural heritage, local identity, and community participation are the most important criteria in the operations management of eco-museums, and Jhushan Town can promote such museums through these guidelines.

  8. Disengagement Operations: Context, Violence, and Spoilers in a New Phase IV Construct

    Science.gov (United States)

    2010-05-21

    disengagement from Operation 4 Robert M. Gates, “Gates Calls European Mood a Danger to Peace,” The New York Times, February 23, 2010; and Noam Chomsky ...September 2009. Chomsky , Noam. Failed States. New York: Metropolitan Books, 2006. Citino, Robert M. Blitzkrieg to Desert Storm: The Evolution of

  9. 78 FR 24734 - Final Environmental Impact Statement for the Construction and Operation of an Infantry Platoon...

    Science.gov (United States)

    2013-04-26

    ... DEPARTMENT OF DEFENSE Department of the Army Final Environmental Impact Statement for the... Environmental Impact Statement (PEIS), Southwest of Range 20, is not operationally feasible and has been.... The Army identified and analyzed environmental and socioeconomic impacts associated with the proposed...

  10. Construction of wave operator for two-dimensional Klein-Gordon-Schrodinger systems with Yukawa coupling

    Directory of Open Access Journals (Sweden)

    Kai Tsuruta

    2013-05-01

    Full Text Available We prove the existence of the wave operator for the Klein-Gordon-Schrodinger system with Yukawa coupling. This non-linearity type is below Strichartz scaling, and therefore classic perturbation methods will fail in any Strichartz space. Instead, we follow the "first iteration method" to handle these critical non-linearities.

  11. Approaches to assessment of socio-demographic and economic aspects of nuclear power plant construction and operation

    International Nuclear Information System (INIS)

    Uvirova, E.

    1984-01-01

    The paper informs of solving the task of economic evaluation of transient and permanent social consequences of the construction and operation of nuclear power plants. The solution takes place in three stages: 1. drafting of methodology, 2. trial of methodology in localities of current nuclear power plant construction, 3. analysis of results and finalizing of methodology. The task is aimed at studying the questions of the return and profitability of investments, the evaluation of optimal economic lifetime, and the effective restoration of basic funds. Its model solution shows the national economy relations of nuclear power. Also discussed is the question of the use of non-balance heat from nuclear power plants. (E.S.)

  12. ANCCLI Scientific Committee - Follow-up of decennial inspections of basic nuclear installations and implication in their operation follow-up. Methodological guide for local information commissions

    International Nuclear Information System (INIS)

    2014-08-01

    This document briefly comments how the assessment and evolution of reactor safety are performed, indicates the various purposes and objectives of a decennial inspection, outlines the specific importance of the third decennial inspections, and presents how a CLI (local information commission) should perform an independent expertise at the occasion of a decennial inspection. It notably indicates which document are available for the different aspects of this inspection (vessel, confinement enclosure, primary and secondary cooling circuits, steam generators, ageing management, reactor safety re-examination, seismic risk, radiation protection, environment, organisational factors)

  13. Operational Excellence in Manufacturing, Service and the Oil & Gas: the Sectorial Definitional Constructs and Risk Management Implication

    Directory of Open Access Journals (Sweden)

    Muazu Hassan Muazu

    2017-09-01

    Full Text Available The current global business climate has not been favorable to most firms irrespective of industry affiliation. That condition necessitated companies to adopt operational excellence as a strategy for optimising output with little resources, reducing lead time with the efficient use of assets and employees and avoiding safety and health issues to people and the environment. As a result of the need for operational excellence, many kinds of literature defined the concept based on the context of industry or sector. Industries such as manufacturing, services, oil and gas, mining and so many industries to mention a few, have their unique construct in the definition and therefore causing dilemma on which dimension to hold on to. It is against this backdrop that this paper synthesizes and integrate all the varying dimensions and fuses out similarities, differences and the antecedence of research directions taken on the few mentioned sectors. The paper thus concludes that the unique construct among all the definitions is continuous improvement, cost reduction, quality, time utilization, operational efficiency, staff involvement and output optimisation. However, they varied on risk management, staff health, safety and the concern for the environment, which is unique to oil and gas industry and that can affect the choice of research variables.

  14. Qualification of technical personnel for employment during construction and operation of the SSC

    International Nuclear Information System (INIS)

    Johnson, C.D.; Wolf, L.J.

    1991-01-01

    In the early stages of the SSC design it became apparent that construction will have a significant impact on post-secondary technical/vocational education in Texas. Present estimates are that from 2,000 to 3,000 employees will be needed in the traditional fields of civil, mechanical, electrical technology, computers as well as exotic technologies such as cryogenics and high vacuum. In this paper an on-going project is described which is directed toward assuring that graduates of Texas post-secondary technical and vocational education programs will be competitive for employment in these jobs. The project involves development of SSC pedagogical material at a level appropriate to the students, education of teachers about the SSC and development of delivery systems for education about the SSC

  15. The energy input in the construction and operation of nuclear power stations

    International Nuclear Information System (INIS)

    Kolb, G.; Niehaus, F.; Rath-Nagel, S.; Voss, A.

    1975-08-01

    The production of electric energy requires energy investments not only for direct fuel input but for the construction of power plants and for the extraction of primary energy fuels as well. When the overall energy balance of energy converting systems has to be assessed these energetic investments must be included. In the present investigation the overall energy input of different nuclear power plant types (comprising the nuclear fuel cycle) is computed and compared with a coal-fired plant. Moreover a time-dependent energy balance for the expansion of nuclear capacity according to the existing nuclear programs is calculated. Even applying only Light Water Reactors the nuclear expansion program (with an installed capacity of 50 GWsub(el) in 1985 and 170 GWsub(el) in 2000) would result in an accumulated fossil fuel saving of approximately the tenfold amount of primary energy consumed in the Federal Republic of Germany yearly today. (orig.) [de

  16. Construction and test of a box system for operations with air-sensitive and radioactive compounds

    International Nuclear Information System (INIS)

    Kuenstler, K.; Betzl, K.; Grosser, H.J.; Furkert, W.; Novotny, D.

    1985-06-01

    A system of mechanical components has been develoed, which can be used to design inert atmosphere boxes as well as radioactive boxes. The advantage in comparison with known designs consists in the modular construction principle which permits variable dimensions. Standard parts (flanges, bushings, air locks and so on) possess a uniform size. The system for the maintenance of a high-purity atmosphere in the box has been improved, decreasing the level of oxygen and water vapour below 10 vpm. The low impurity level in the inert atmosphere is attained by means of continuous circulation of the gases through a purification system. The usefulness of the boxes for handling air-sensitive and radioactive compounds has been tested over a period of some years. (author)

  17. Construction Operations Building Information Exchange (COBIE): Requirements Definition and Pilot Implementation Standard

    Science.gov (United States)

    2007-06-01

    Swalley U.S. Department of State, Overseas Buildings Operations Toby Wilson U.S. Army, Corps of Engineers, Engineer R&D Center Jeff Wix AEC3 The...exchanged in COBIE. To map those information exchanges to the IFC model, the Information Delivery Manual (IDM) process [ Wix 2007] was also used. The...Folksonomy. Wikimedia Foundation. http://en.wikipedia.org/wiki/Folksonomy/, accessed 3 August 2007. Wix , Jeffrey. 2007. Information Delivery Manual

  18. Toward an understanding of the impact of production pressure on safety performance in construction operations.

    Science.gov (United States)

    Han, Sanguk; Saba, Farzaneh; Lee, Sanghyun; Mohamed, Yasser; Peña-Mora, Feniosky

    2014-07-01

    It is not unusual to observe that actual schedule and quality performances are different from planned performances (e.g., schedule delay and rework) during a construction project. Such differences often result in production pressure (e.g., being pressed to work faster). Previous studies demonstrated that such production pressure negatively affects safety performance. However, the process by which production pressure influences safety performance, and to what extent, has not been fully investigated. As a result, the impact of production pressure has not been incorporated much into safety management in practice. In an effort to address this issue, this paper examines how production pressure relates to safety performance over time by identifying their feedback processes. A conceptual causal loop diagram is created to identify the relationship between schedule and quality performances (e.g., schedule delays and rework) and the components related to a safety program (e.g., workers' perceptions of safety, safety training, safety supervision, and crew size). A case study is then experimentally undertaken to investigate this relationship with accident occurrence with the use of data collected from a construction site; the case study is used to build a System Dynamics (SD) model. The SD model, then, is validated through inequality statistics analysis. Sensitivity analysis and statistical screening techniques further permit an evaluation of the impact of the managerial components on accident occurrence. The results of the case study indicate that schedule delays and rework are the critical factors affecting accident occurrence for the monitored project. Copyright © 2013 Elsevier Ltd. All rights reserved.

  19. Construction and Operational Experience with a Superconducting Octupole Used to Trap Antihydrogen

    Energy Technology Data Exchange (ETDEWEB)

    Wanderer P.; Escallier, J.; Marone, A.; Parker, B.

    2011-09-06

    A superconducting octupole magnet has seen extensive service as part of the ALPHA experiment at CERN. ALPHA has trapped antihydrogen, a crucial step towards performing precision measurements of anti-atoms. The octupole was made at the Direct Wind facility by the Superconducting Magnet Division at Brookhaven National Laboratory. The magnet was wound with a six-around-one NbTi cable about 1 mm in diameter. It is about 300 mm long, with a radius of 25 mm and a peak field at the conductor of 4.04 T. Specific features of the magnet, including a minimal amount of material in the coil and coil ends with low multipole content, were advantageous to its use in ALPHA. The magnet was operated for six months a year for five years. During this time it underwent about 900 thermal cycles (between 4K and 100K). A novel operational feature is that during the course of data-taking the magnet was repeatedly shut off from its 950 A operating current. The magnet quenches during the shutoff, with a decay constant of 9 ms. Over the course of the five years, the magnet was deliberately quenched many thousands of times. It still performs well.

  20. Draft Environmental Impact Statement for Construction and Operation of a Depleted Uranium Hexafluoride Conversion Facility at the Paducah, Kentucky, Site

    International Nuclear Information System (INIS)

    2003-01-01

    This document is a site-specific environmental impact statement (EIS) for construction and operation of a proposed depleted uranium hexafluoride (DUF 6 ) conversion facility at the U.S. Department of Energy (DOE) Paducah site in northwestern Kentucky (Figure S-1). The proposed facility would convert the DUF 6 stored at Paducah to a more stable chemical form suitable for use or disposal. In a Notice of Intent (NOI) published in the ''Federal Register'' (FR) on September 18, 2001 (''Federal Register'', Volume 66, page 48123 [66 FR 48123]), DOE announced its intention to prepare a single EIS for a proposal to construct, operate, maintain, and decontaminate and decommission two DUF 6 conversion facilities at Portsmouth, Ohio, and Paducah, Kentucky, in accordance with the National Environmental Policy Act of 1969 (NEPA) (''United States Code'', Title 42, Section 4321 et seq. [42 USC 4321 et seq.]) and DOE's NEPA implementing procedures (''Code of Federal Regulations'', Title 10, Part 1021 [10 CFR Part 1021]). Subsequent to award of a contract to Uranium Disposition Services, LLC (hereafter referred to as UDS), Oak Ridge, Tennessee, on August 29, 2002, for design, construction, and operation of DUF 6 conversion facilities at Portsmouth and Paducah, DOE reevaluated its approach to the NEPA process and decided to prepare separate site-specific EISs. This change was announced in a ''Federal Register'' Notice of Change in NEPA Compliance Approach published on April 28, 2003 (68 FR 22368); the Notice is included as Attachment B to Appendix C of this EIS. This EIS addresses the potential environmental impacts from the construction, operation, maintenance, and decontamination and decommissioning (DandD) of the proposed conversion facility at three alternative locations within the Paducah site; from the transportation of depleted uranium conversion products to a disposal facility; and from the transportation, sale, use, or disposal of the fluoride-containing conversion products

  1. Environmental impact assessment on the construction and operation of municipal solid waste sanitary landfills in developing countries: China case study

    DEFF Research Database (Denmark)

    Yang, Na; Damgaard, Anders; Lü, Fan

    2014-01-01

    An inventory of material and energy consumption during the construction and operation (C&O) of a typical sanitary landfill site in China was calculated based on Chinese industrial standards for landfill management and design reports. The environmental impacts of landfill C&O were evaluated through...... life cycle assessment (LCA). The amounts of materials and energy used during this type of undertaking in China are comparable to those in developed countries, except that the consumption of concrete and asphalt is significantly higher in China. A comparison of the normalized impact potential between...

  2. Well construction team approach creates a new future for one company's operations on the Dutch Continental Shelf

    International Nuclear Information System (INIS)

    Stringer, R.B.; Bakker, T.W.; Mejnertsen, T.

    1994-01-01

    Rising costs and low energy prices were inhibiting the development of marginal fields on the Dutch Continental Shelf, resulting in a major reduction in drilling activity. This triggered a change from traditional operating and contracting strategies to a Well Construction Team approach based on partnering agreements with the principal drilling and service contractors. The change has resulted in major cost reductions coupled to improved well quality that are justifying the re-evaluation of previously sub-economic development prospects. This paper describes the strategies employed and presents the results achieved during the first year of the partnership

  3. Construction and Operation of a Deep Geological Spent Fuel Repository in Sweden; Some Regulatory Aspects and Challenges

    International Nuclear Information System (INIS)

    Hedberg, Bengt

    2014-01-01

    The implementation of a deep geological spent fuel disposal concept in Sweden poses challenges on both implementer and regulator in many aspects. One such challenge is the application of the regulatory framework in a different situation compared to conventional process type nuclear facilities. A specific challenge in this regard is how to understand and address constraints from post-closure safety related to the construction and operation of the repository. The maybe most challenging aspect, however, is the unusually long time frame, i.e. many generations, for realization of the project. This paper addresses some of these challenges from a regulatory perspective. (authors)

  4. Environmental Assessment for the construction and operation of the Health Physics Site Support Facility on the Savannah River Site

    International Nuclear Information System (INIS)

    1995-07-01

    DOE has prepared an environmental assessment for the proposed construction and operation of the Health Physics Site Support Facility on the Savannah River Site. This (new) facility would meet requirements of the site radiological protection program and would ensure site compliance with regulations. It was determined that the proposed action is not a major Federal action significantly affecting the quality of the environment within the meaning of NEPA. Therefore, a finding of no significant impact is made, and no environmental impact statement is needed

  5. Mitigation for the Construction and Operation of Libby Dam, 2001-2002 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Dunnigan, James L.; Marotz, Brian L.; DeShazer, Jay (Montana Department of Fish, Wildlife and Parks, Libby, MT)

    2003-06-01

    Libby Reservoir was created under an International Columbia River Treaty between the United States and Canada for cooperative water development of the Columbia River Basin (Columbia River Treaty 1964). Libby Reservoir inundated 109 stream miles of the mainstem Kootenai River in the United States and Canada, and 40 miles of tributary streams in the U.S. that provided habitat for spawning, juvenile rearing, and migratory passage (Figure 1). The authorized purpose of the dam is to provide power (91.5%), flood control (8.3%), and navigation and other benefits (0.2%; Storm et al. 1982). The Pacific Northwest Power Act of 1980 recognized possible conflicts stemming from hydroelectric projects in the northwest and directed Bonneville Power Administration to ''protect, mitigate, and enhance fish and wildlife to the extent affected by the development and operation of any hydroelectric project of the Columbia River and its tributaries...'' (4(h)(10)(A)). Under the Act, the Northwest Power Planning Council was created and recommendations for a comprehensive fish and wildlife program were solicited from the region's federal, state, and tribal fish and wildlife agencies. Among Montana's recommendations was the proposal that research be initiated to quantify acceptable seasonal minimum pool elevations to maintain or enhance the existing fisheries (Graham et al. 1982). Research to determine how operations of Libby Dam affect the reservoir and river fishery and to suggest ways to lessen these effects began in May, 1983. The framework for the Libby Reservoir Model (LRMOD) was completed in 1989. Development of Integrated Rule Curves (IRCs) for Libby Dam operation was completed in 1996 (Marotz et al. 1996). The Libby Reservoir Model and the IRCs continue to be refined (Marotz et al 1999). Initiation of mitigation projects such as lake rehabilitation and stream restoration began in 1996. The primary focus of the Libby Mitigation project now is to

  6. Operational results for the raster scanning power supply system constructed at the Bevalac Biomedical Facility

    International Nuclear Information System (INIS)

    Stover, G.; Halliwell, J.; Nyman, M.; Dwinell, R.

    1989-03-01

    A raster scanning power supply for controlling an 8.0 Tesla-meter relativistic heavy-ion beam at the Biomedical Facility has been recently completed and is undergoing electrical testing before on- line operation in 1989. The scanner system will provide tightly controlled beam uniformity and off-axis treatment profiles with large aspect ratios and unusual dimensions. This article will discuss original specifications, agreement with measured results and special device performance (i.e. GTOs, FET actuator assembly, etc.). 5 refs., 4 figs

  7. [Developing and testing of decompression regimes for caisson operations while constructing Moscow metro].

    Science.gov (United States)

    Rodchenkov, S V; Syrovegin, A V; Shulagin, I A

    1996-01-01

    Decompression regimes for caisson operations at the pressures up to 5 ata exceeding duration of the regimes specified in the caisson regulations have been developed. The regimes were tested and validated in dry altitude chamber with participation of exercising human subjects. Seventeen test-subjects took part in 54 tests. No symptoms of decompression sickness were documented. Air embolism was observed in 28 +/- 6% of cases at rest and in 72 +/- 6% of cases following provocative leg movements. The air embolism expression tended to increase with exposure to pressure.

  8. Stress-induced deficits in working memory and visuo-constructive abilities in Special Operations soldiers.

    Science.gov (United States)

    Morgan, Charles A; Doran, Anthony; Steffian, George; Hazlett, Gary; Southwick, Steven M

    2006-10-01

    Pre-clinical and clinical studies have shown acute stress may impair working memory and visuo-spatial ability. This study was designed to clarify the nature of stress-induced cognitive deficits in soldiers and how such deficits may contribute to operational or battlefield errors. One hundred eighty-four Special Operations warfighters enrolled in Survival School completed pre-stress measures of dissociation and trauma exposure. Subjects were randomized to one of three assessment groups (Pre-stress, Stress, Post-stress) and were administered the Rey Ostereith Complex Figure (ROCF). All subjects completed post-stress measures of dissociation. ROCF copy and recall were normal in the Pre- and Post-stress groups. ROCF copy and recall were significantly impaired in the Stress Group. Stress group ROCF copy performance was piecemeal, and ROCF recall was impaired. Symptoms of dissociation were negatively associated with ROCF recall in the Stress group. Baseline dissociation and history of traumatic stress predicted cognitive impairment during stress. Stress exposure impaired visuo-spatial capacity and working memory. In rats, monkeys, and humans, high dopamine and NE turnover in the PFC induce deficits in cognition and spatial working memory. Improved understanding of stress-induced cognitive deficits may assist in identification of soldiers at risk and lead to the development of better countermeasures.

  9. Construction of extremal local positive-operator-valued measures under symmetry

    International Nuclear Information System (INIS)

    Virmani, S.; Plenio, M.B.

    2003-01-01

    We study the local implementation of positive-operator-valued measures (POVMs) when we require only the faithful reproduction of the statistics of the measurement outcomes for all initial states. We first demonstrate that any POVM with separable elements can be implemented by a separable superoperator, and develop techniques for calculating the extreme points of POVMs under a certain class of constraint that includes separability and positive partial transposition. As examples we consider measurements that are invariant under various symmetry groups (Werner, isotropic, Bell diagonal, local orthogonal), and demonstrate that in these cases separability of the POVM elements is equivalent to implementability via local operations and classical communication (LOCC). We also calculate the extrema of these classes of measurement under the groups that we consider, and give explicit LOCC protocols for attaining them. These protocols are hence optimal methods for locally discriminating between states of these symmetries. One of many interesting consequences is that the best way to locally discriminate Bell-diagonal mixed states is to perform a two-outcome POVM using local von Neumann projections. This is true regardless of the cost function, the number of states being discriminated, or the prior probabilities. Our results give the first cases of local mixed-state discrimination that can be analyzed quantitatively in full, and may have application to other problems such as demonstrations of nonlocality, experimental entanglement witnesses, and perhaps even entanglement distillation

  10. Reconstruction of a constructed wetland with horizontal subsurface flow after 18 years of operation.

    Science.gov (United States)

    Hudcová, Tereza; Vymazal, Jan; Dunajský, Michal Kriška

    2013-01-01

    The constructed wetland (CW) for 326 PE with horizontal subsurface flow at Kotenčice, Central Bohemia, Czech Republic, was built in 1994. Despite the relatively high efficiency of the CW, the filtration beds suffered from clogging, and therefore it was decided in 2011 to rebuild the whole system. The new treatment system was built as an experimental system consisting of four different combinations of horizontal and vertical beds. The major aim of the design was to determine the best hybrid combination which then could be used in the future for refurbishment of older horizontal flow CWs or for the new systems. The mechanical pretreatment consists of mechanical bar screens, a new Imhoff tank, and the original settling tank which has been converted into the accumulation tank from where the wastewater is pumped into the wetlands. The filters are planted with Phragmites australis, Phalaris arundinacea, Iris pseudacorus, Iris sibirica, Glyceria maxima and Lythrum salicaria in order to evaluate and compare various plant species' effect on the treatment process. The new technology includes a tertiary treatment which consists of a greenhouse with a photo-reactor for the cultivation of algae and hydroponic systems (residual nutrients removal), sludge reed-beds and a composting field.

  11. Integrated constructed wetland systems: design, operation, and performance of low-cost decentralized wastewater treatment systems.

    Science.gov (United States)

    Behrends, L L; Bailey, E; Jansen, P; Houke, L; Smith, S

    2007-01-01

    Several different types of constructed wetland systems are being used as decentralized treatment systems including surface-flow, subsurface-flow, vertical-flow, and hybrid systems. Archetypical wetland systems have design strengths and weaknesses, and therefore it should be possible to design combined (integrated) systems to optimize a number of important treatment processes. This study provides comparative efficacy data for two integrated wetland treatment systems (IWTS) designed to enhance treatment of medium strength wastewater generated from a pilot-scale intensive fish farm. Results from the twenty eight months study included consistently high removal of COD (84% +) and ammonia nitrogen (93%) in both systems. Initially, phosphorus removal was also high (>90%) in both systems, but removal efficacy declined significantly over time. Nitrate removal was significantly better in the system that provided sequential aerobic and anoxic environments. Short hydraulic retention times coupled with sustained removal of COD and ammonia indicate that the ReCip components could be a least-cost wastewater treatment technology in the decentralized market sector.

  12. Construction of the monitoring, processing and logging systems supporting for management, operation and maintenance of the Dalat reactor control system

    International Nuclear Information System (INIS)

    Trinh Dinh Hai; Nguyen Thanh Cuong; Huynh Ton Nghiem; Phan Quoc Minh; Nguyen Duc Tuan; Nguyen Nhi Dien

    2004-01-01

    From 1/2002 to 12/2003, we implemented successfully a project, entitled 'Construction of the monitoring, processing and logging systems supporting for management, operation and maintenance of the Dalat reactor control system' under the assistance of the Ministry of Science and Technology. Its main results such as Testing Apparatus based on microcontroller for all functional boards of the Control Logic System of the Reactor Control System (RCS). Technical support CD - ROM for Process Instrumentation System, software for logging automatically information from important systems of the RCS through LAN, program for failure management of Process Instrumentation System have been playing an important role for observation, operation support, maintenance of the RCS. Through this project, the implementation group has grown up rapidly. The control and instrumentation group has been provided with some modern equipment, electronic components, and materials for maintenance work and research development in the years to come. This paper presents typical results and discussions. (author)

  13. LEIR commissioning successfully completed

    CERN Multimedia

    2006-01-01

    An important milestone has been passed in the preparation of the injector complex to supply ions to the LHC experiments. The LEIR lead-ion beam, seen on one of the control screens just before the PS injection region. The Low-Energy Ion Ring - LEIR for short - has passed its first tests with flying colours. On 12 May, the ring that will accumulate lead ions for the LHC was shut down after seven months of tests (see Bulletin 44/2005). 'The commissioning phase was a resounding success,' enthuses a satisfied Michel Chanel, head of the LEIR construction project. After several months of fine-tuning, the LEIR team has achieved its aim of producing the kind of beam required for first lead-ion collisions in the LHC in 2008. This involved creating bunches containing 230 million ions, in line with the specifications for those first beams. This success can be put down to the machine's outstanding design and components. 'It's a great achivement by all the teams involved in the machine's construction,' underlines Christian...

  14. Protocol to the 1994 Co-operation Agreement between The Government of the Islamic Republic of Pakistan and CERN concerning a Special Contribution by Pakistan towards the Construction of the LHC

    CERN Document Server

    2003-01-01

    CERN signed a Co-operation Agreement with the Government of Pakistan in 1994, which was followed in 1997 by a Protocol signed with the Pakistan Atomic Energy Commission (PAEC) concerning CMS magnet supports. CERN and PAEC then signed in 1998 a Memorandum of Understanding for collaboration in the construction of the CMS detector. The participation by Pakistani scientists and engineers in the CERN programme is channelled through the National Centre of Physics (NCP) established at the Quaid-i-Azzam University in Islamabad, under the terms of a 1999 Protocol to the 1994 Co-operation Agreement. The engineering and detector construction work performed under these Agreements has been of high quality, and the Pakistani participation is valued highly by the CMS collaboration. In continuation of this co-operation, Pakistan, represented by PAEC as funding agency, has now proposed to make in-kind contributions to the LHC Project of a value of up to ten million US dollars. Under the proposed scheme, CERN shall pay 50% of ...

  15. Protocol to the 1994 Co-operation Agreement between The Government of the Islamic Republic of Pakistan and CERN concerning a Special Contribution by Pakistan towards the Construction of the LHC

    CERN Document Server

    2003-01-01

    CERN signed a Co-operation Agreement with the Government of Pakistan in 1994, which was followed in 1997 by a Protocol signed with the Pakistan Atomic Energy Commission (PAEC) concerning CMS magnet supports. CERN and PAEC then signed in 1998 a Memorandum of Understanding for collaboration in the construction of the CMS detector. The participation by Pakistani scientists and engineers in the CERN programme is channelled through the National Centre of Physics (NCP) established at the Quaid-i-Azzam University in Islamabad, under the terms of a 1999 Protocol to the 1994 Co-operation Agreement. The engineering and detector construction work performed under these Agreements has been of high quality, and the Pakistani participation is valued highly by the CMS collaboration. In continuation of this co-operation, Pakistan, represented by PAEC as funding agency, has now proposed to make in-kind contributions to the LHC Project, such as mechanical components and assembly work, with a value of up to ten million US dollar...

  16. An Approach for Measuring Reductions in Operations, Maintenance, and Energy Costs: Baseline Measures of Construction Industry Practices for the National Construction Goals.

    Science.gov (United States)

    Chapman, Robert E.; Rennison, Roderick

    The Construction and Building Subcommittee of the National Science and Technology Council (NSTC) has established seven National Construction Goals for the construction industry and is developing baseline measures for current practices and progress with respect to each goal. This document provides a detailed set of baseline measures for the NSTC…

  17. Method and apparatus for model construction within orthopaedic and traumatological operation planning

    International Nuclear Information System (INIS)

    Brix, F.; Hebbinghaus, D.

    1985-01-01

    Orthopaedic and traumatological surgeons are increasingly faced with surgical problems which require an unusual amount of planning. Endoprothetic measures concerning very small joints or posttraumatic conditions will illustrate the underlying idea. The same applies to constitutionally false positions which are to be corrected, or to plastic operations following, for instance, tumour resection. Planning means and methods available to date do not suffice for meeting these problematic situations as a rule. Thus, survey radiographs in two planes, tomograms, distance and spot-film radiograms will supply no picture true to scale and but an incomplete three-dimensional image. It is quite obvious that surgical strategy should be determined by means of a model true to scale, in a ''dress rehearsal'', so to speak. (orig./WU) [de

  18. Managing Environmental Impact Assessment for Construction and Operation in New Nuclear Power Programmes

    International Nuclear Information System (INIS)

    2014-01-01

    This publication describes the environmental impact assessment (EIA) process, its utilization and the necessary infrastructure for such a process in order to provide a holistic approach for EIA in new nuclear power programmes. It also emphasizes the environmental aspects unique to a nuclear power programme, assuming that a State embarking on such a programme already has an environmental regulatory framework for the industrial projects in place. This publication also describes the phased implementation of the EIA programme in accordance with the phases described in IAEA Nuclear Energy Series No. NG-G-3.1. This publication is addressed to senior managers, project managers or coordinators and technical specialists of government authorities and agencies, including regulatory bodies, operating organizations and supporting industries, and other organizations involved in environmental issues

  19. Crosshole investigations - details of the construction and operation of the hydraulic testing system

    International Nuclear Information System (INIS)

    Holmes, D.; Sehlstedt, M.

    1986-05-01

    The Crosshole Programme, part of the international Stripa Project is designed to evaluate the effectiveness of various remote-sensing techniques in characterising a rock mass around a repository. A multidisciplinary approach has been adopted in which various geophysical, mapping and hydrogeological methods are used to determine the location and characteristics of significant features in the rock. The Programme utilises six boreholes drilled in a fan array from the 360 metre level in the Stripa Mine, Sweden. The hydrogeological component of the work uses single and crosshole testing methods, including sinusoidal pressure testing, to locate fractures and characterise groundwater movement within them. Crosshole methods use packers to isolate portions of two boreholes which both intersect a significant feature in the rock mass. Hydraulic signals are generated in one isolated section and received in the other borehole. This report describes the design and operation of the computer-controlled system which automatically performs the hydrogeological tests. (author) 3 refs., 13 figs

  20. Design, construction and operation experience of the He-He intermediate heat exchanger

    International Nuclear Information System (INIS)

    Itoh, M.

    1980-01-01

    The conditions required for the primary helium, which is the cooling medium for the high temperature gas cooled reactor, are prescribed to be 1,000 0 C in temperature and 40 kgf/cm 2 in pressure at the outlet of the reactor, while the conditions required for the secondary helium at the outlet of the intermediate heat exchanger are prescribed to be 925 0 C in temperature and 45 kgf/cm 2 in pressure. This means that relatively high temperatures and high pressure are required for the system. The purpose of the present research and development project is to establish a design method, safety evaluation techniques, and safety-securing measures to be applied to an intermediate heat exchanger and to the overall heat exchanging system, which will satisfy those strict operating conditions as mentioned above. Research and development work on the high temperature heat exchanger has been and is being carried out