WorldWideScience

Sample records for construction and maintenance personnel

  1. Training of maintenance personnel

    International Nuclear Information System (INIS)

    Rabouhams, J.

    1986-01-01

    This lecture precises the method and means developed by EDF to ensure the training of maintenance personnel according to their initial educational background and their experience. The following points are treated: General organization of the training for maintenance personnel in PWR and GCR nuclear power stations and in Creys Malville fast breeder reactor; Basic nuclear training and pedagogical aids developed for this purpose; Specific training and training provided by contractors; complementary training taking into account the operation experience and feedback; Improvement of velocity, competence and safety during shut-down operations by adapted training. (orig.)

  2. Construction and maintenance of underground mine roads

    Energy Technology Data Exchange (ETDEWEB)

    Logan, A.S.; Seedsman, R.W. [Coffey Partners International Pty. Ltd. (Australia)

    1995-12-31

    Good roads are essential in moving men and materials to and from the underground workplace. An underground coal industry funded project was recently completed on underground mine road construction and maintenance. This paper discusses practical approaches to construction and maintenance of underground mine roads using transferable civil technologies and innovative techniques. Mine pavements are generally low-cost (relative to civil roads), constructed to varying standards using locally available materials to best meet the mobility needs of the mine. Performance of pavements is thus largely dependent on the environmental conditions, quality of the available road making materials, maintenance policies and available resources. This paper explains the causes of bad roads in various underground environments. It details available management strategies, construction and water control techniques, road maintenance and vehicle considerations. It concludes that the trend to larger rubber tires mining equipment needs to be matched with construction and maintenance of high quality road surfaces. For large operations, the total cost due to poor roads may equate to in excess of $A1 million per annum. The strategies outlined in this paper provide the basis for construction and maintenance of underground mine roads to help achieve desired production targets. (author). 2 tabs., 4 figs., 7 refs.

  3. Maintenance personnel performance simulation (MAPPS) model: overview and evaluation efforts

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Ryan, T.G.

    1984-01-01

    The development of the MAPPS model has been completed and the model is currently undergoing evaluation. These efforts are addressing a number of identified issues concerning practicality, acceptability, usefulness, and validity. Preliminary analysis of the evaluation data that has been collected indicates that MAPPS will provide comprehensive and reliable data for PRA purposes and for a number of other applications. The MAPPS computer simulation model provides the user with a sophisticated tool for gaining insights into tasks performed by NPP maintenance personnel. Its wide variety of input parameters and output data makes it extremely flexible for application to a number of diverse applications. With the demonstration of favorable model evaluation results, the MAPPS model will represent a valuable source of NPP maintainer reliability data and provide PRA studies with a source of data on maintainers that has previously not existed

  4. Initial training and technology transfer during the generational transition in the personnel of maintenance

    International Nuclear Information System (INIS)

    Gonzalez Anez, F.

    2006-01-01

    A significant progress in training capabilities of nuclear power plants maintenance personnel has taken place since mid of nineties. In the past, maintenance personnel acquired their competence throughout the years on their job positions. A greater flexibility and new polyvalence requirements demand efficient training actions. In addition, the new personnel incomes associated to the generational change require clear qualification processes. The objective is to develop didactic means and to have competent instructors to preserve and to transfer the knowledge acquires during all these past years to the new incorporations. This article describes a summary of actions and methods followed for the design, development and implantation of training plans for maintenance personnel. (Author)

  5. Maintenance Personnel Performance Simulation (MAPPS) model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Knee, H.E.; Haas, P.M.

    1984-01-01

    A stochastic computer model for simulating the actions and behavior of nuclear power plant maintenance personnel is described. The model considers personnel, environmental, and motivational variables to yield predictions of maintenance performance quality and time to perform. The mode has been fully developed and sensitivity tested. Additional evaluation of the model is now taking place

  6. Experience with training of operating and maintenance personnel of nuclear power plants

    International Nuclear Information System (INIS)

    Pospisil, M.; Cencinger, F.

    1988-01-01

    The system is described of the specialist training of personnel for Czechoslovak nuclear power plants. Training consists of basic training, vocational training and training for the respective job. Responsible for the training is the Research Institute for Nuclear Power Plants; actual training takes place at three training centres. Personnel are divided into seven categories for training purposes: senior technical and economic staff, shift leaders, whose work has immediate effect on nuclear safety, engineering and technical personnel of technical units, shift leaders of technical units, personnel in technical units, shift service personnel and operating personnel, maintenance workers. Experience with training courses run at the training centre is summed up. Since 1980 the Centre has been training personnel mainly for the Dukovany nuclear power plant. Recommendations are presented for training personnel for the Temelin nuclear power plant. (Z.M.)

  7. Comparison of all-remote and personnel access maintenance operations for INTOR

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Finn, P.A.; Gohar, M.Y.; Stasko, R.R.

    1985-01-01

    The INTOR reference design was developed to permit limited maintenance operations external to the reactor in a ''hands-on'' mode; all internal operations would be remotely accomplished. The design embodies those requirements for shielding, tritium containment and cleanup, and confinement of contaminated particulate matter to permit personnel access. The cost reflects these requirements, at least first order. The impact of personnel access on the reactor design and its costs are cause to reexamine the maintenance approach on which much of the present configuration is based. The purpose of this study is to compare the benefits and costs associated with personnel access maintenance procedures to those associated with all-remote maintenance procedures and to identify modifications to the baseline design that could enhance maintenance operations

  8. Maintenance Personnel Performance Simulation (MAPPS) model: description of model content, structure, and sensitivity testing. Volume 2

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Wolf, J.J.; Knee, H.E.

    1984-12-01

    This volume of NUREG/CR-3626 presents details of the content, structure, and sensitivity testing of the Maintenance Personnel Performance Simulation (MAPPS) model that was described in summary in volume one of this report. The MAPPS model is a generalized stochastic computer simulation model developed to simulate the performance of maintenance personnel in nuclear power plants. The MAPPS model considers workplace, maintenance technician, motivation, human factors, and task oriented variables to yield predictive information about the effects of these variables on successful maintenance task performance. All major model variables are discussed in detail and their implementation and interactive effects are outlined. The model was examined for disqualifying defects from a number of viewpoints, including sensitivity testing. This examination led to the identification of some minor recalibration efforts which were carried out. These positive results indicate that MAPPS is ready for initial and controlled applications which are in conformity with its purposes

  9. Engineering and Design. Design, Construction, and Maintenance of Relief Wells

    National Research Council Canada - National Science Library

    1992-01-01

    The objective of this manual is to provide guidance and information on the design, construction, and maintenance of pressure relief wells installed for the purpose of relieving subsurface hydrostatic...

  10. Improving human performance in maintenance personnel

    International Nuclear Information System (INIS)

    Gonzalez Anez, Francisco; Agueero Agueero, Jorge

    2010-01-01

    The continuous evolution and improvement of safety-related processes has included the analysis, design and development of training plans for the qualification of maintenance nuclear power plant personnel. In this respect, the international references in this area recommend the establishment of systematic qualification programmes for personnel performing functions or carrying out safety related tasks. Maintenance personnel qualification processes have improved significantly, and training plans have been designed and developed based on Systematic Approach to Training methodology to each job position. These improvements have been clearly reflected in recent training programmes with new training material and training facilities focused not only on developing technical knowledge and skills but also on improving attitudes and safety culture. The objectives of maintenance training facilities such as laboratories, mock-ups real an virtual, hydraulic loops, field simulators and other training material to be used in the maintenance training centre are to cover training necessities for initial and continuous qualification. Evidently, all these improvements made in the qualification of plant personnel should be extended to include supplemental personnel (external or contracted) performing safety-related tasks. The supplemental personnel constitute a very spread group, covering the performance of multiple activities entailing different levels of responsibility. Some of these activities are performed permanently at the plant, while others are occasional or sporadic. In order to establish qualification requirements for these supplemental workers, it is recommended to establish a rigorous analysis of job positions and tasks. The objective will be to identify the qualification requirements to assure competence and safety. (authors)

  11. Implementation of sustainability in bridge design, construction and maintenance.

    Science.gov (United States)

    2012-12-01

    The focus of this research is to develop a framework for more sustainable design and construction : processes for new bridges, and sustainable maintenance practices for existing bridges. The framework : includes a green rating system for bridges. The...

  12. Traffic incident management in construction and maintenance work zones.

    Science.gov (United States)

    2009-01-01

    In 2004, the Federal Highway Administration published updated rules governing work zone safety and mobility; all highway construction and maintenance projects using federal-aid highway funds are required to develop transportation management plans (TM...

  13. Development and introduction of a modular training and qualification concept for maintenance personnel

    International Nuclear Information System (INIS)

    Kumpf, Thomas; Mueller, Nina; Hofbauer, Detlef

    2009-01-01

    The presentation entitled ''Development and Introduction of a Modular Training and Qualification Concept for Maintenance Personnel'' presents the background, concept and training modules of a reactor services training concept that was jointly elaborated by a working group consisting of the ''Maintenance manager workshop'' working panel of the VGB, the Kraftwerksschule (KWS) PowerTech Training Center, and AREVA NP GmbH in Erlangen and Offenbach. This concept is part of AREVA's comprehensive training and qualification approach which comprises inter alia extensive introduction sessions for new employees, the corporation-wide highly appreciated AREVA University as well as specialized training facilities as for example the CETIC in Chalon-sur-Saone, France and the training center in Lynchburg, USA, or the worldwide largest integration center for digital I and C equipment for safety applications in nuclear power plants in Erlangen. AREVA NP's training concept for maintenance personnel addresses not only employees from AREVA NP working in nuclear maintenance but also personnel from nuclear power plants as well as independent experts, representatives from authorities and other interest groups. (orig.)

  14. Asbestos exposure of building maintenance personnel.

    Science.gov (United States)

    Mlynarek, S; Corn, M; Blake, C

    1996-06-01

    The exposures of building maintenance personnel and occupants to airborne asbestos fibers, and the effects of operations and maintenance programs on those exposures, continue to be an important public health issue. The subject of this investigation was a large metropolitan county with numerous public buildings which routinely conducted air sampling for asbestos. A total of 302 personal air samples in nine task categories collected during maintenance worker activities in proximity to asbestos-containing materials were analyzed; 102 environmental air samples in four task categories were also analyzed. The arithmetic means of the 8-hr time weighted average exposures for personal sampling for each task category were all below the Occupational Safety and Health Administration permissible exposure level of 0.1 fibers (f)/cc > 5 microm. The highest mean 8-hr time weighted average exposure was 0.030 f/cc > 5 microm for ceiling tile replacement. The maximum asbestos concentration during sample collection for environmental samples was 0.027 f/cc > 5 microm. All asbestos-related maintenance work was done within the framework of an Operations and Maintenance Program (OMP) which utilized both personal protective equipment and controls against fiber release/dispersion. Results are presented in association with specific OMP procedures or controls. These results support the effectiveness of using Operations and Maintenance Programs to manage asbestos in buildings without incurring unacceptable risk to maintenance workers performing maintenance tasks.

  15. Design, construction and maintenance of greenhouse structures

    NARCIS (Netherlands)

    Waaijenberg, D.

    2006-01-01

    In this paper a review is given about the effects of different parts of the solar radiation and its importance for plant growth in greenhouses. Besides the most important visible part of the light (PAR), ultraviolet (UV), near infrared (NIR) and far infrared (FIR) are discussed. The strength of the

  16. Construction, Maintenance and Demolition of Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Smet, Camiel de [Hilti Corporation, P.O. Box 333, FL-9494 Schaan (Liechtenstein)

    2008-07-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  17. Construction, Maintenance and Demolition of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Smet, Camiel de

    2008-01-01

    Hilti is your reliable partner in nuclear power plant construction, maintenance and demolition worldwide. Professional advice and innovative solutions for virtually every phase of construction and supply technologically leading products and systems to increase your productivity and help to create and maintain safe and lasting plants is offered. The solutions for nuclear power plants construction, maintenance and demolition have been employed with great success in many different countries on a wide variety of projects due in no small way to their worldwide availability. An unbroken, international exchange of experience upholds a permanent innovation process. This assures our customers that they always receive products on the very latest technological standard. This paper is not intended to cover all topics related to nuclear power plants. The idea is more to give a kind of an overview. The paper covers briefly the following topics: safety (corrosion and fire), fastenings, measuring and finally decommissioning of nuclear power plants. (author)

  18. Sustainable construction building performance simulation and asset and maintenance management

    CERN Document Server

    2016-01-01

    This book presents a collection of recent research works that highlight best practice solutions, case studies and practical advice on the implementation of sustainable construction techniques. It includes a set of new developments in the field of building performance simulation, building sustainability assessment, sustainable management, asset and maintenance management and service-life prediction. Accordingly, the book will appeal to a broad readership of professionals, scientists, students, practitioners, lecturers and other interested parties.

  19. Maintenance of signs and sign supports : a guide for local highway and street maintenance personnel.

    Science.gov (United States)

    2010-01-01

    Highway signs are the means by which the road agency communicates the rules, warnings, guidance and other highway information that drivers need to navigate their roads and streets. This guide, which is an update to the same titled guide published in ...

  20. DOE handbook: Guide to good practices for training and qualification of maintenance personnel

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training.

  1. DOE handbook: Guide to good practices for training and qualification of maintenance personnel

    International Nuclear Information System (INIS)

    1996-03-01

    The purpose of this Handbook is to provide contractor training organizations with information that can be used to verify the adequacy of and/or modify existing maintenance training programs, or to develop new training programs. This guide, used in conjunction with facility-specific job analyses, provides a framework for training and qualification programs for maintenance personnel at DOE reactor and nonreactor nuclear facilities. Recommendations for qualification are made in four areas: education, experience, physical attributes, and training. The functional positions of maintenance mechanic, electrician, and instrumentation and control technician are covered by this guide. Sufficient common knowledge and skills were found to include the three disciplines in one guide to good practices. Contents include: qualifications; on-the-job training; trainee evaluation; continuing training; training effectiveness evaluation; and program records. Appendices are included which relate to: administrative training; industrial safety training; fundamentals training; tools and equipment training; facility systems and component knowledge training; facility systems and component skills training; and specialized skills training

  2. Experience in the recruitment, organization and training of operations and maintenance personnel for the Malaysian research reactor

    International Nuclear Information System (INIS)

    Jamal Khair Ibrahim.

    1983-01-01

    The TRIGA Reactor located at the Tun Ismail Atomic Research Centre (PUSPATI) Complex is owned and operated by the Nuclear Energy Unit of the Prime Minster's Department. The operations and maintenance personnel are part and parcel of the national civil service organization. As such, the requirement and remuneration of these personnel are handled by a central federal government personnel management agency in common with personnel from other federal government agencies. In addition, the reactor is the first and only one in Malaysia, a developing country, which is the process of committing herself towards a nuclear power programme. These factors coupled with the absence of an independent reactor operator licensing agency posed unique problems in the recruitment, organization, training and licensing of operations personnel for the facility. The paper discusses these factors and their bearing on the recruitment, training, licensing and career development prospects of the PUSPATI TRIGA Reactor operators. (author)

  3. Ground-water problems in highway construction and maintenance

    Science.gov (United States)

    Rasmussen, W.C.; Haigler, L.B.

    1953-01-01

    This report discusses the occurrence of ground water in relation to certain problems in highway construction and maintenance. These problems are: the subdrainage of roads; quicksand; the arrest of soil creep in road cuts; the construction of lower and larger culverts necessitated by the farm-drainage program; the prevention of failure of bridge abutments and retaining walls; and the water-cement ratio of sub-water-table concrete. Although the highway problems and suggested solutions are of general interest, they are considered with special reference to the State of Delaware, in relation to the geology of that State. The new technique of soil stabilization by electroosmosis is reviewed in the hope that it might find application here in road work and pile setting, field application by the Germans and Russians is reviewed.

  4. Evaluation of radiation exposures to personnel during maintenance operations and fuel recharging at NPP with the WWER-440 reactor

    International Nuclear Information System (INIS)

    Beskrestnov, N.V.; Vasil'ev, Eh.S.; Kozlov, V.F.; Odinokov, Yu.Yu.; Romanov, V.P.; Tsypin, S.G.

    1983-01-01

    A unified data acquisition and analysis system is presented. The system is intended to assess radiation exposures to personnel and perform radiation monitoring during periodic maintenance operations sna fuel recharging at NPPs with WWER-440 reactors. The basic principles of developing this system, patterns of danita collection are considered, points of radiation motoring chosen with account of the NPP operating experience are pointed out

  5. Review of maintenance personnel practices at nuclear power plants

    International Nuclear Information System (INIS)

    Chockie, A.D.; Badalamente, R.V.; Hostick, C.J.; Vickroy, S.C.; Bryant, J.L.; Imhoff, C.H.

    1984-05-01

    As part of the Nuclear Regulatory Commission (NRC) sponsored Maintenance Qualifications and Staffing Project, the Pacific Northwest Laboratory (PNL) has conducted a preliminary assessment of nuclear power plant (NPP) maintenance practices. As requested by the NRC, the following areas within the maintenance function were examined: personnel qualifications, maintenance training, overtime, shiftwork and staffing levels. The purpose of the assessment was to identify the primary safety-related problems that required further analysis before specific recommendations can be made on the regulations affecting NPP maintenance operations

  6. Delineating the Construct Network of the Personnel Reaction Blank: Associations with Externalizing Tendencies and Normal Personality

    Science.gov (United States)

    Blonigen, Daniel M.; Patrick, Christopher J.; Gasperi, Marianna; Steffen, Benjamin; Ones, Deniz S.; Arvey, Richard D.; de Oliveira Baumgartl, Viviane; do Nascimento, Elizabeth

    2011-01-01

    Integrity testing has long been utilized in personnel selection to screen for tendencies toward counterproductive workplace behaviors. The construct of externalizing from the psychopathology literature represents a coherent spectrum marked by disinhibitory traits and behaviors. The present study drew on a sample of male and female undergraduates…

  7. 30 CFR 57.8531 - Construction and maintenance of ventilation doors.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Construction and maintenance of ventilation... NONMETAL MINES Ventilation Underground Only § 57.8531 Construction and maintenance of ventilation doors... constructed of wood; (c) Maintained in good condition; (d) Self-closing, if manually operated; and (e...

  8. Accident characteristics at construction and maintenance zones in urban areas.

    Science.gov (United States)

    1990-01-01

    Work zone safety is currently a major concern to transportation and highway engineers because of the relatively higher rates of accidents in these areas. There is a strong indication that during the next decade, emphasis will be placed on maintenance...

  9. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    OpenAIRE

    Feng, Qiang; Li, Songjie; Sun, Bo

    2014-01-01

    A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance...

  10. Proficiency evaluation of maintenance personnel: Training equivalency determination

    International Nuclear Information System (INIS)

    Price, W.J.

    1991-01-01

    The nuclear industry has recognized the importance of safe, quality, productive maintenance practices and has taken a number of initiatives that have generally improved maintenance programs. Because proficient maintenance practices are critical to plant safety and reliability, most plants have also recognized the need for reliable, valid testing techniques that demonstrate and assure the competence of their maintenance personnel. Until now, resource demands were too great to develop in-plant testing programs. In the past, maintenance supervisors have exempted personnel from training, using informal judgment of the employees' previous training and experience and informal observation of the employee on the job. While this procedure may have some degree of validity, it fails to provide the documentation for training equivalency that is required to satisfy the US Nuclear Regulatory Commission (NRC) regulations and Institute of Nuclear Power Operations (INPO) guidelines. To assess and demonstrate the proficiency levels of personnel, Calvert Cliffs needed to establish an objective, reliable, time-saving, and valid system to evaluate the competency levels of personnel. This was done in a joint effort with the Electric Power Research Institute

  11. INTOR critical issue D: maintainability. Tritium containment and personnel access vs remote maintenance, Chapter VI of the US INTOR report for Phase Two A, Part 2

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Finn, P.A.; Gohar, Y.

    1984-01-01

    The purpose of this study is to compare the benefits and costs associated with personnel access mmaintenance procedures compared to those of all-remote maintenance procedures. The INTOR Phase Two A, Part I configuration was used to make this comparison. For both approaches, capital and operating costs were considered to first order, maintenance equipment requirements were investigated, maintenance requirements common to both approaches and unique to each were identified, tritium handling requirements were outlined, and maintenance scenarios and device downtime were developed for both. In addition, estimates of person-rem exposure were made for the personnel access approach

  12. Experiences on implementation of on-the-job training programmes for maintenance personnel in Asco and Vandellos II NPP

    International Nuclear Information System (INIS)

    Gonzalez Anez, F.

    2002-01-01

    This paper presents a process and methodology for definition and implementation of On-Job-Training Programmes (OJTP) for new maintenance personnel in Asco and Vandellos II. The content of these OJTP has been defined for each maintenance job position. A simplified task analysis was carried out to specify common and specific training. Generally, the specific maintenance training programs includes training modules in classroom and workshop environment on (1) maintenance of components and (2) maintenance fundamentals of mechanical, electrical and instrumentation. This specific training has been finally completed with a OJT programme based on the execution, observation or/and discussion about the main maintenance activities under entitled worker supervision. Each lesson, task or activity is defined in a format where the training objective, milestones and deliverables are specified. The list of activities makes up the OJTP. It is based on applicable plant procedures and maintenance instruction to each job position. Several participants or actors have been defined to implement the OJTP: co-ordinator of the process, tutors for each OJT task, line maintenance manager and trainee. Co-ordinator is the link among all actors. He knows the OJTP scope and plans the training activities according to the line maintenance manager. Co-ordinator carries out a tracking process, informs to training and maintenance managers about the progress in the programme, elaborates the progress and final reports and keeps training records. Tutors, usually entitled workers in the job position, transfer the knowledge to the trainee and discuss, review and assess the trainee's performance. Trainee carries out the scheduled tasks, keeps records of work done, prepares deliverables and informs about his activities to the Co-ordinator. The OJT programme for each new maintenance worker starts with a launching meeting with all involved actors. The goals of this meeting are to explain the OJTP scope and

  13. Radio Frequency Identification in Construction Operation and Maintenance

    DEFF Research Database (Denmark)

    Sørensen, Kristian Birch; Christiansson, Per; Svidt, Kjeld

    2008-01-01

    As early as in 1995 it was stated that automatic identification of objects using RFID was a promising technology for the construction industry. However, 13 years later the applications of RFID in the construction industry are rare and mostly used in prototype projects or used for theft prevention...

  14. Job analysis of the instrument and control technician position for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Federman, P.J.

    1983-08-01

    This report is one of a series that is planned to describe the results of a program undertaken by the Oak Ridge National Laboratory (ORNL) for the US Nuclear Regulatory Commission, Office of Nuclear Regulatory Research, to define, develop, validate, and disseminate a methodology for the quantitative prediction of human reliability in the conduct of maintenance tasks in nuclear power plants (NPPs). ORNL has subcontracted portions of this effort to Applied Psychological Services, Inc. This report on the job analysis of the Instrument and Control technician (NUREG/CR-3274) and a report on the job analysis of the electrician position (NUREG/CR-3275) comprise a part of the initial efforts of the development phase of this program. With the publication of the job analysis of the electrician position, the series of job analyses reports addressing nuclear power plant maintenance personnel will be complete. Subsequent reports addressing model development and validation are planned

  15. 26 CFR 1.528-2 - Organized and operated to provide for the acquisition, construction, management, maintenance and...

    Science.gov (United States)

    2010-04-01

    ... acquisition, construction, management, maintenance and care of association property. 1.528-2 Section 1.528-2... acquisition, construction, management, maintenance and care of association property. (a) Organized and... association are the acquisition, construction, management, maintenance, and care of association property. In...

  16. Study on Maintenance Personnel Development Plan For The Exported APR1400 Commissioning

    International Nuclear Information System (INIS)

    Cho, Sungbae; Kim, Jongdae; Jun, Hokwang; Hwang, Inok; Kang, Jaeyuel

    2012-01-01

    This paper indicates ways to develop maintenance personnel for the exported APR1400 commissioning. The exported APR1400 has not been experienced ay maintenance yet, and requirements for maintenance personnel have not been clarified yet. Based on sound maintenance experience, KEPCO Plant Service and Engineering Company (KEPCO KPS) has studied on maintenance training and career requirement to establish a development plan of the maintenance personnel for the exported nuclear power plant. By defining manpower and training requirement, and mobilization plan, we expect to secure reliability of the exported APR1400

  17. Registration-analytical maintenance and methodological features of construction of the financial account

    OpenAIRE

    Kraevskyy, V.

    2009-01-01

    In article registration-analytical maintenance and methodological features of construction of the financial account is considered. Financial account, net lending, net borrowing, financial assets, system of the national accounts.

  18. Safer construction and maintenance practices to minimize potential liability by counties from accidents.

    Science.gov (United States)

    1979-09-01

    Tort claims resulting from alleged highway defects have introduced : an additional element in the planning, design, construction, and maintenance : of highways. A survey of county governments in Iowa was undertaken : in order to quantify the magnitud...

  19. State-of-the-practice : evaluation of sediment basin design, construction, maintenance, and inspection procedures.

    Science.gov (United States)

    2012-08-01

    The following document is the summary of results from a survey that was conducted to evaluate : the state-of-the-practice for sediment basin design, construction, maintenance, and inspection : procedures by State Highway Agencies (SHAs) across the na...

  20. Urinary lithiasis in civil construction workers as a management indicator for health and improvement in personnel

    Directory of Open Access Journals (Sweden)

    Renato Ribeiro Nogueira Ferraz

    2014-12-01

    Full Text Available Introduction: Empirical information provided by health care professionals acting in the first line of care report a constant increase in the number of civil construction workers that present painful acute conditions, in most cases associated with the existence of urinary tract calculi. Aims: Evaluating the prevalence of urinary lithiasis in civil construction workers, as a means to identify indicators for the management of health and personnel. Methods: Observational study based on directed questionnaire. Results: From the 94 participants, 18 (19% were lithiasic, mostly due to overweight and reduced fluid intake. Conclusion: The observed prevalence appeared to be two times greater than that of the general population. Thus, prevention for such condition gains relevance, in order to avoid discomfort for the worker, and also reduce costs due to absenteeism, improving productivity, benefiting the workers by performance and creating the perspective of an improved quality of life.

  1. Innovative Robot Archetypes for In-Space Construction and Maintenance

    Science.gov (United States)

    Rehnmark, Fredrik; Ambrose, Robert O.; Kennedy, Brett; Diftler, Myron; Mehling Joshua; Brigwater, Lyndon; Radford, Nicolaus; Goza, S. Michael; Culbert, Christopher

    2005-01-01

    The space environment presents unique challenges and opportunities in the assembly, inspection and maintenance of orbital and transit spaceflight systems. While conventional Extra-Vehicular Activity (EVA) technology, out of necessity, addresses each of the challenges, relatively few of the opportunities have been exploited due to crew safety and reliability considerations. Extra-Vehicular Robotics (EVR) is one of the least-explored design spaces but offers many exciting innovations transcending the crane-like Space Shuttle and International Space Station Remote Manipulator System (RMS) robots used for berthing, coarse positioning and stabilization. Microgravity environments can support new robotic archetypes with locomotion and manipulation capabilities analogous to undersea creatures. Such diversification could enable the next generation of space science platforms and vehicles that are too large and fragile to launch and deploy as self-contained payloads. Sinuous manipulators for minimally invasive inspection and repair in confined spaces, soft-stepping climbers with expansive leg reach envelopes and free-flying nanosatellite cameras can access EVA worksites generally not accessible to humans in spacesuits. These and other novel robotic archetypes are presented along with functionality concepts

  2. Maintenance experiences with hand and foot monitor for monitoring alpha and beta radiation of personnel in NFC

    International Nuclear Information System (INIS)

    Ramachandra Rao, A.; Kulkarni, R.S.; Banerjee, P.K.

    2010-01-01

    NFC is producing natural uranium and enriched uranium fuels for various reactors including PHWR etc. Monitoring of α and β radiations in the active plants of NFC is very much essential in many aspects. The personnel who are handling radiation materials have to be monitored for α radiation of hands and cloths and β radiation of feet. So the Alpha and Beta Monitor became important monitoring equipment for monitoring α and β radiations of persons working in active plants of NFC. Many Alpha and Beta Monitors of make, ECIL, PLA, and Nucleonix etc. were being used in active plants in NFC. Basically α and β radiation monitors consists of four PMT (Photo Multiplier Tubes) for detection of radiation of hands and one PMT for monitoring clothes. The PMT use ZnS (Ag) as the scintillator for detection of α radiation. GM tubes are used to detect β radiation of feet. The latest Hand and Foot Monitors have been incorporated with PC based monitoring system along with software for making the monitoring process more efficient and user friendly. As an instrumentation maintenance team for these monitors, our experiences are varied. These monitors are to be periodically maintained and tested for its effective functioning in monitoring the nuclear radiation. The monitors procured from M/s. ECIL were being used since long time in these areas. The instrumentation maintenance had faced some problems with these monitors such as frequent failure of High Voltage cards, Amplifier and Counter PCB cards. Modifications were made in the circuits of High Voltage and Counter cards to minimize the failure rate and for loading of Display and Monitoring Software through Hard disk instead of from floppy disk. So the availability of monitors for monitoring radiation got improved. Later the introduction of more sophisticated α and β radiation monitors of M/s. PLA make in these areas further improved monitoring of radiation of personnel working in active areas. These monitors are more user

  3. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    Directory of Open Access Journals (Sweden)

    Feng Qiang

    2014-04-01

    Full Text Available A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance process is described as a 3-layer multi-agent system (MAS model. A communication and reasoning strategy among the agents is put forward. A fleet maintenance personnel configuration algorithm is proposed based on contract net protocol (CNP. Finally, a fleet of 10 aircraft is studied for verification purposes. A mission type with 3 waves of continuous dispatch is imaged. Compared with the traditional methods that can just provide configuration results, the proposed method can provide optimal maintenance strategies as well.

  4. Design and construction of an in-pipe robot for inspection and maintenance

    KAUST Repository

    Sibai, Fadi N.

    2012-12-01

    Inspection and maintenance of aging pipelines is crucial to the reliable and continued distribution of hydrocarbons. In this paper, we describe the design and construction of a robotic platform for inspection and minor maintenance of pipelines. The 7.5 kg robotic platform was demonstrated to move straight inside 12″ to 16″ diameter pipes in a forward or backward direction, and either horizontally or vertically. The experimental robotic platform has three sets of two wheels, and three driving motors. The equations governing the mechanical frame\\'s component sizes are presented and the robotic frame component dimensions derived. The paper also discusses the construction and testing of the robot. Future work includes adding sensors, controls for turning, a microcontroller board, and a robotic arm for performing maintenance tasks. © 2012 IEEE.

  5. Design and construction of an in-pipe robot for inspection and maintenance

    KAUST Repository

    Sibai, Fadi N.; Sayegh, Amer Ahmed; Al-Taie, Ihsan

    2012-01-01

    Inspection and maintenance of aging pipelines is crucial to the reliable and continued distribution of hydrocarbons. In this paper, we describe the design and construction of a robotic platform for inspection and minor maintenance of pipelines. The 7.5 kg robotic platform was demonstrated to move straight inside 12″ to 16″ diameter pipes in a forward or backward direction, and either horizontally or vertically. The experimental robotic platform has three sets of two wheels, and three driving motors. The equations governing the mechanical frame's component sizes are presented and the robotic frame component dimensions derived. The paper also discusses the construction and testing of the robot. Future work includes adding sensors, controls for turning, a microcontroller board, and a robotic arm for performing maintenance tasks. © 2012 IEEE.

  6. Education as a Basic Element of Improving Professional Important Qualities of Aviation Technical Maintenance Personnel

    Directory of Open Access Journals (Sweden)

    Gorbačovs Oļegs

    2016-12-01

    Full Text Available In this article the importance of professional qualities, competence and their increase, directly dependent on the training of aviation technical maintenance personnel and determination the level of flight safety is covered. This publication analyses necessary training and requirements for aviation technical personnel involved in aircraft maintenance, as well as the requirements for aviation training organizations, defined as per Part-147, for such personnel preparation and training.

  7. Costs of construction, operation and maintenance of nuclear power plants - determinant factors

    International Nuclear Information System (INIS)

    Silva, R.A. da

    1981-01-01

    A study about the construction costs of the Angra-1 nuclear power plant, including direct costs, equipment costs, installation and indirect costs such as: engineering, job-training and administration is presented. The operation and maintenance costs of the Angra-1 nuclear power plant and costs of energy generation are still studied. (E.G.) [pt

  8. Careers in Construction, Building Maintenance and Allied Occupations. Junior High School. Course Outline.

    Science.gov (United States)

    Dade County Public Schools, Miami, FL. Office of Vocational and Adult Education.

    The guide was prepared to assist student emploration in the fields of construction and building maintenance and as preparation for further specialized training. The course was prepared for quinmester use and includes a series of manipulative job assignments within a laboratory equipped to simulate the actual job atmosphere found in the…

  9. PERFORMANCE-BASED CONTRACTING IN CONSTRUCTION PHASE AND MAINTENANCE PHASE OF PAVEMENT

    Science.gov (United States)

    Yoshida, Takeshi

    Performance-based contracting for pavement in Japan started as performance warranties in construction phase, in 1999. Recently, road agencies have recognized the applicability of this type of contracting in outsourcing of maintenance activities. The objectives of this study are to clarify the issues of performance specifying in construction phase and maintenance phase of pavement, and to propose measures to be taken. This paper, with the recognition that the life of each pavement depends on performance standards for various attributes, reviews domestic and foreign examples of performance-based contracting. A performance standard based on the average of current practices can enhance product quality and service life with a warranty contract. Repair thresholds and response time for each deficiency should be considered as performance standards in maintenance phase.

  10. A Self-Evaluation Tool for Development of Maintenance Personnel's Competences

    International Nuclear Information System (INIS)

    Piirto, A.; Paajanen, P.; Kantola, J.; Vanharanta, H.

    2007-01-01

    Teollisuuden Voima Oy (TVO) operates Olkiluoto nuclear power plant, which consists of twin 840 MWe BWR units. The first nuclear power plant unit, Olkiluoto 1, was connected to the national grid in September 1978 and the second almost identical unit, Olkiluoto 2, in February 1980. The construction of the third 1600 MWe PWR unit, Olkiluoto 3, was started in the spring 2005. The commercial operation of the new unit will start in 2009. The operation results of TVO's nuclear power plant units have been among the best ones in the world. The operational success is primary attributable to the early elimination of technical problems and preparation for defects beforehand. Also development of outage planning, maintenance methods and a low rate of disturbances have been very significant in achieving good operation results. TVO's long-term goals in operation and maintenance are: - keeping the load factor over 90 % and avoiding operational disturbances; - keeping the technical condition of the plant units 'as new'; - continuous learning and development of operation and maintenance functions; - decreasing the production costs. These goals also set requirements for maintenance personnel's competences. The high-grade competence of maintenance personnel has an effect on safe and reliable nuclear power plant operation. However, as a concept, safety is not always easy to define. A high level of safety is the result of the complex interaction of good design, operational safety and human performance: A set of indicators which are designed to monitor all aspects of operational safety performance are needed to form a total picture of the safe plant operation. In the framework six key areas of improvement of nuclear safety are defined. These key areas of improvement are based on the vision that the plant operates with low risk. Implementation of the actions will result in direct and permanent positive impact on plant nuclear safety and safety culture. The information gained from

  11. [A preliminary evaluation of mental status and an investigation of occupational health knowledge demand in operating and maintenance personnel in wind power plants].

    Science.gov (United States)

    Hu, S Q; Zhang, Q; Zhu, X H; Sun, K; Chen, S Z; Liu, A G; Luo, G L; Huang, W

    2016-10-20

    Objective: To investigate the mental status, level of occupational health knowledge, health behaviors, and occupational health knowledge demand in operating and maintenance personnel in wind power plants, and to provide a basis for formulating protective measures of occupational health for operating and maintenance personnel in wind power plants. Methods: A cluster sampling was performed in regionally representative wind power plants in the wind power industry from May 2014 to June 2015, and the Symptom Checklist-90 (SCL-90) and a self-made evaluation questionnaire were used to investigate the general status, mental health, and occupational health knowledge demand in 160 operating and maintenance workers. Results: Of all respondents, 26.9% had mental health issues. The awareness rate of infectious disease knowledge and preventive measures was 11.9%. Of all workers, 96.5% wanted to know the occupational hazard factors in the workplace, and 96.3% wanted to get the knowledge of the prevention of related diseases. Conclusion: Mental health issues in operating and maintenance personnel in wind power plants cannot be neglected and there is a high demand for occupational health services and related knowledge. Comprehensive intervention measures for health promotion in the workplace should be adopted to improve working environment, enhance individual mental health education, increase the level of occupational health management, and protect the health of workers.

  12. 78 FR 5715 - Construction and Maintenance-Culvert Pipe Selection

    Science.gov (United States)

    2013-01-28

    ... Register's home page at: http://www.archives.gov/federal-register and the Government Printing Office's Web... the market had changed to the extent that Appendix A no longer adequately encompassed the universe of...

  13. Construction, Maintenance and Repair as Elements in Rubble Mound Breakwater Design

    DEFF Research Database (Denmark)

    Burcharth, Hans F.; Rietveld, C.F.W.

    Very often rubble mound breakwater designs seem to be a result only of stability considerations corresponding to design wave conditions. Designers tend to put too little emphasis on practical problems related to construction, maintenance and repair. As is discussed in the paper due consideration...... of these problems Ieeds to a more economical design in terms of lower total costs during the structural lifetime....

  14. Profit ability versus construction equipment maintenance

    OpenAIRE

    Clutts, Craig A.

    2010-01-01

    CIVINS (Civilian Institutions) Thesis document Approved for public release ; distribution is unlimited Construction equipment is a high cost of capital investment necessary for the successful existence of a private construction company and essential to the mission success of the Naval Construction Force (NCF). The highest impact cost factor other than the initial purchase investment is the expenses related to maintenance and repair. As the equipment ages, the ownership costs decrease an...

  15. Maintenance personnel performance simulation (MAPPS): a model for predicting maintenance performance reliability in nuclear power plants

    International Nuclear Information System (INIS)

    Knee, H.E.; Krois, P.A.; Haas, P.M.; Siegel, A.I.; Ryan, T.G.

    1983-01-01

    The NRC has developed a structured, quantitative, predictive methodology in the form of a computerized simulation model for assessing maintainer task performance. Objective of the overall program is to develop, validate, and disseminate a practical, useful, and acceptable methodology for the quantitative assessment of NPP maintenance personnel reliability. The program was organized into four phases: (1) scoping study, (2) model development, (3) model evaluation, and (4) model dissemination. The program is currently nearing completion of Phase 2 - Model Development

  16. Augmented reality for improved communication of construction and maintenance plans in nuclear power plants

    International Nuclear Information System (INIS)

    Sorensen, Soren S.

    2010-01-01

    The purpose of implementing Augmented Reality, AR, in the planning, construction and maintenance of Nuclear Power Plants is to secure strict control, precise and correct constructions, exact execution of assignments and heightened safety at all levels. Communication of construction plans to ensure precise and correct assembly of structural elements is essential in all building projects. This is especially crucial in the construction of nuclear plants and installation of new components. The current ways in which construction plans are communicated, blueprints, 3D digital models and written descriptions all embody the need for significant levels of abstraction and interpretation, and are thus both difficult to understand and can lead to misinterpretations. A simulation system with full scale three dimensional models experienced in the physical setting where operations are to take place would bring operators closer to the real life assignments. Augmented Reality is a visualization technology that provides this motivation. (author)

  17. 76 FR 21270 - Interpretation of Duty and Rest Provisions for Maintenance Personnel

    Science.gov (United States)

    2011-04-15

    ... memory, decreased vigilance, reduced motivation, increased irritability, and an increase in the number of... operations. Fatigue often leads to decreased vigilance and impaired short term memory, resulting in a likely...

  18. Challenges to United States Tactical Air Force Aircraft Maintenance Personnel: Past, Present and Future

    Science.gov (United States)

    1991-09-01

    study f-ocuses on the most 3 recent changes faced by the TAF rraintenance organization. The last chapter comprares and contrasts the development of... forma - tions. But during the interwar years, both of these missions went into eclipse as doctrinal thinkers established the primacy of bombardment as...i.sninent" (15:4). In response to tho! USAF taskin:g, TAC activated Headquarters Nine- teenth Air force and mr- de it solely reaponsible for planning "for

  19. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    OpenAIRE

    Tiong Kung Leong; Norhayati Zakuan; Muhamad Zameri Mat Saman; Mohd. Shoki Md. Ariff; Choy Soon Tan

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client sat...

  20. A cost summary applicable to seismic construction and maintenance of nuclear safety related piping

    International Nuclear Information System (INIS)

    Stevenson, J.D.

    1995-01-01

    This paper presents a summary of costs applicable to nuclear power plant piping for an earthquake defined as 0.2 SSE-PGA as a function of three eras of initial construction: 1967--1974, 1974--1981 and 1981--1990. Costs have been presented for both new construction and maintenance in operating plants using both the original PSAR-FSAR design criteria and current SRP requirements. It is recommended that the cost information contained in this report be considered in evaluating the cost benefit relationships associated with current and proposed future changes in seismic design procedures applicable to safety-related piping systems

  1. Experience with quality of training of personnel in start-up, operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ziman, V.; Alaxin, E.

    1983-01-01

    The theoretical education of personnel takes place in the branch training centre in Jaslovske Bohunice and in the concern training centre of the Slovak Power Plants. Practical training takes place in the Bohunice V-1 power plant. Selected specialists are trained in the training centre of the Novo Voronezh nuclear power plant, at the Paks nuclear plant and in the training centre of the Tusimice power plant. The recruitment, selection, schooling, practical training and placement of personnel and their assignment to posts is done in such a manner as to make sure that the complexly trained personnel is available 6 months to 3 years prior to the physical start-up of the nuclear power plant. The training of university graduates for the post of reactor operator takes 18 months or more. Trained personnel attend in-service training courses in form of complementary courses whose content includes such problems as the elimination of typified possible accidents, on the basis of the analysis of all failures which occurred in the previous period. The rising quality of personnel training at the Bohunice V-1 nuclear power plant is reflected in the decreasing number of failures caused by the human factor and in the increased availability of the power units. (M.D.)

  2. Construction of 'Monju' maintenance and waste disposal building by Shimizu Corporation

    International Nuclear Information System (INIS)

    Baba, Ikuo

    1994-01-01

    The scale of the building, the use, the outline of construction works and the construction processes of the maintenance and waste disposal building among the facilities of the fast breeder prototype reactor 'Monju' are described, and the construction technology which was adopted for ensuring the quality, the construction period and the safety, the state of carrying out quality assurance activity and so on are reported. Moreover, the building works and the electricity works are mentioned, and the examples that were devised on building side for smoothly advancing later electricity side works are introduced, further, as a feature work, the work of erecting the steel framework that constitutes the large space for repair area is explained. The arrangement of buildings, and the scale and the structure of the maintenance and waste disposal building which is a reinforced concrete building, partly steel framework reinforced concrete building, with four stories above ground and four stories underground and the total floor area of 14,354m 2 are described. Liquid waste treatment and washing facilities are in underground, and repair area, solid waste treatment and electric and air conditioning facilities are on above ground floors. (K.I.)

  3. Job analysis of the maintenance supervisor and instrument and control supervisor positions for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Bartter, W.D.; Siegel, A.I.; Federman, P.J.

    1982-11-01

    The present report presents the results of an analysis of the jobs of maintenance mechanic supervisors and instrument and control technician supervisors in nuclear power plants. Such an analysis was considered to be a necessary step in defining the scope and focus of a model for predicting and analyzing nuclear power maintenance reliability. The model will focus upon tasks and subtasks performed by various job positions. The results of this job analysis, along with the results of a survey of user needs vis-a-vis such a model and the results of parallel analyses of the job of maintenance mechanics and of instrument and control technicians provide the sound foundation on which such a model may be built. Job analysis possesses implications for a number of purposes. It provides insight into selection standards, job structuring and organization, performance analysis, training objective establishment, and training content derivation. Accordingly, the results of the present work possess implications for a variety of interest areas relative to safe and efficient operation of nuclear power plants

  4. TOPS On-Line: Automating the Construction and Maintenance of HTML Pages

    Science.gov (United States)

    Jones, Kennie H.

    1994-01-01

    After the Technology Opportunities Showcase (TOPS), in October, 1993, Langley Research Center's (LaRC) Information Systems Division (ISD) accepted the challenge to preserve the investment in information assembled in the TOPS exhibits by establishing a data base. Following the lead of several people at LaRC and others around the world, the HyperText Transport Protocol (HTTP) server and Mosaic were the obvious tools of choice for implementation. Initially, some TOPS exhibitors began the conventional approach of constructing HyperText Markup Language (HTML) pages of their exhibits as input to Mosaic. Considering the number of pages to construct, a better approach was conceived that would automate the construction of pages. This approach allowed completion of the data base construction in a shorter period of time using fewer resources than would have been possible with the conventional approach. It also provided flexibility for the maintenance and enhancement of the data base. Since that time, this approach has been used to automate construction of other HTML data bases. Through these experiences, it is concluded that the most effective use of the HTTP/Mosaic technology will require better tools and techniques for creating, maintaining and managing the HTML pages. The development and use of these tools and techniques are the subject of this document.

  5. CONSIDERATIONS UPON DESIGNING MODULAR CONSTRUCTIONS FOR IMPROVING THE PRODUCTS ASSEMBLING, MAINTENANCE AND RECYCLING PROCESSES

    Directory of Open Access Journals (Sweden)

    BÂRSAN Lucian

    2015-11-01

    Full Text Available Modular constructions are frequently used in industry because of their multiple advantages. Used from the antiquity as a measuring system that ensured good proportions for the objects or buildings, the module is used in present industry as a tool for improving the product maintenance, repair, upgrading, and/or recycling. Modular constructions can be assembled and disassembled easily, facilitating the postuse actions like subassemblies reuse, or materials recovering for the recycling process. An important aspect of this paper is that designers should create the modular solution even from the conceptual design stage and build a structure of functions based on well motivated arguments and which can easily be brake out according to technological possibilities, product functioning and assembly solutions.

  6. Advanced boiling water reactor (ABWR). Design, construction, operation and maintenance experience

    International Nuclear Information System (INIS)

    Idesawa, M.

    1998-01-01

    The ABWR has experienced all phases of design, construction, operation and maintenance at Kashiwazaki-Kariwa Nuclear Power Station Units No.6 and 7 and confirmed that originally intended development targets have been achieved with highly satisfactory results. This is the fruit of a project that collected wisdom from various sources under a international cooperative organization, with Tokyo Electric Power Company taking the leading role from the onset. These two units have not only demonstrated that ABWRs have superior performance as the first standard units of advanced light water reactor but also aroused a hope for the big potential advantages that ABWRs can provide us. The ABWR has already been awarded a U.S. standard license for having proved that it can comply with the requirements of international regulatory systems with an ample margin. There are also many construction programs with ABWRs progressing both domestically and abroad, suggesting that it has won recognition as an international standard plant. We will do our utmost to perfect the operation and maintenance records of Kashiwazaki-Kariwa Units No.6 and 7, which is the top runner among ABWRs, and to make known the superiority of this reactor to the world. (J.P.N.)

  7. Screening and monitoring of main diseases a modern strategy of health maintenance in personnel of radiation dangerous plants

    International Nuclear Information System (INIS)

    Takhauov, R. M.; Karpov, A. B.; Kubat, I. I.; Maslyuk, A. I.; Semenova, Y. V.; Freidin, M. B.; Trivozhenko, A. B.; Litvinenko, T. M.

    2004-01-01

    Population health is greatly determined by social factors, mode of life, ecological situation, amount and quality of medical assistance. The analysis of reasons of health troubles increase in population should be done taking into account the above aspects. Main consideration should be given to the development of measures aimed at the highest possible decrease of technogenic and anthropogenic factors influence on a human. Thereupon a complex programme of main diseases screening and monitoring in the personnel of the Siberian Group of Chemical enterprises (SGCE) to be the biggest one among Russian atomic plants has been developed. The purpose of the present paper is to determine main diseases at the earliest stage, the decrease of death rate, as well as the complex estimation of technogenic factor influence on the personnel of radiation dangerous plants nand their offsprings. In this case a long-term effect of low doses seems to be the main risk factor. Taking into account the structure of death rate causes of the population of industrialized countries as well as the spectrum of stochastic effects of ionizing radiation, the screening of cardiac ischemia and arterial hypertension, localization of cancer and congenital malformations have been chosen as the program priorities. Algorithm of instrumental laboratory screening of a particular disease includes modern diagnostic tests. Groups ar risk are formed taking into account a complex of exogenous and endogenous risk factors (age, chronic diseases, bad habits, length of service at a radiation dangerous plant, dose loads, hereditary factors) and on the basis of the screening examination results. The information obtained is entered in the list of database of the Regional Medico dosimetric Register of the SGCE personnel and Seversk residents followed by analysis and monitoring of groups ar risk. (Author) 4 refs

  8. Job analysis of maintenance-mechanic position for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Siegel, A.I.; Bartter, W.D.; Kopstein, F.F.

    1982-06-01

    The task list method of job survey was used. In collaboration with BWR and PWR personnel, a list of 107 tasks performed by maintenance mechanics was developed, grouped into: remove and install, test and repair, inspect and perform preventive maintenance, miscellaneous, communication, and report preparation. For each listed task, the questionnaire form inquired into: frequency of performance, task completion time, safety consequences of improper performance, and the amount of training required to perform the task proficiently. Scaled information was requested about seven abilities: (1) visual speed, accuracy, and recognition; (2) gross motor coordination; (3) fine manual dexterity; (4) strength and stamina; (5) cognition; (6) memory; and (7) problem solving required for function completion. Survey forms were distributed to 27 nuclear power plants. Thirty-one maintenance mechanics representing 17 plants returned the completed forms. Frequency of performing tasks was bimodally distributed: (1) between once a year and once every six months, and (2) about once a week. More than half of the tasks have potential risk consequences if improperly performed. The five tasks with the greatest risk implications in the case of inadequate performance were: (1) remove and install reactor and dry-well heads, (2) test and repair reactor system components, (3) remove and install pressurizer mechanical relief valves, (4) test and repair pressurizer relief valves, (5) remove and install core spray pumps, seals, and valves. Hierarchically, the public risk associated with the various functions was: (1) remove and install, (2) test and repair, (3) preventive maintenance, (4) miscellaneous tasks, (5) communication, and (6) report preparation

  9. Mortality of a cohort of road construction and maintenance workers with work disability compensation.

    Science.gov (United States)

    d'Errico, A; Mamo, C; Tomaino, A; Dalmasso, M; Demaria, M; Costa, G

    2002-01-01

    Surveillance systems of occupational mortality are useful tools to identify cases of diseases suspected as occupational and to monitor their occurrence over time, in space and in population subgroups. Many surveillance systems make use of administrative data in which information about occupations and/or economic sectors of the subjects enrolled is reported, such as death certificates, hospital discharge data, census data, tax and pension records, and workers' compensation archives. In the present study we analyzed the mortality of a cohort of road construction and maintenance workers enrolled through the Italian national archive of work disability compensations, also in order to evaluate the possible use of this administrative source to monitor occupational mortality. 8,000 subjects (7,879 males) receiving a disability compensation while working in the "road construction and maintenance" sector were identified from INAIL (National Institute for Insurance of Accidents at Work) archives. Vital status of these subjects was ascertained using the information available in INAIL archives and in the national tax register. For those found to be deceased from INAIL or tax archives, or without any information on vital status, a mail follow-up was started. We considered as observation period the years from 1980 to 1993. A record linkage with the ISTAT (Italian Institute of Statistics) national mortality registry was performed and the cause of death was retrieved for 964 out of 1,259 subjects. The analysis was restricted to males, leaving altogether 863 observed deaths with ascertained cause (84.7% of 1,019 total male deaths). SMR for overall mortality and PMR for specific cause mortality were computed, using the general Italian male population as reference. Overall mortality was significantly reduced (SMR = 79.0; 95% CI = 74.2-84.0). Proportional mortality analysis revealed significant excess risks for all malignant tumours (332 deaths, PMR = 1.08) and for digestive diseases

  10. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    International Nuclear Information System (INIS)

    1995-11-01

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology

  11. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    Science.gov (United States)

    Leong, Tiong Kung; Ariff, Mohd. Shoki Md.

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings. PMID:24701182

  12. State waste discharge permit application: Hydrotest, maintenance and construction discharges. Revision 0

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-11-01

    On December 23, 1991, the US DOE< Richland Operation Office (RL) and the Washington State Department of Ecology (Ecology) agreed to adhere to the provisions of the Department of Ecology Consent Order No. DE91NM-177 (216 Consent Order) (Ecology and US DOE 1991). The 216 Consent Order list regulatory milestones for liquid effluent streams at the Hanford Site and requires compliance with the permitting requirements of Washington Administrative Code. Hanford Site liquid effluent streams discharging to the soil column have been categorized on the 216 Consent Order as follows: Phase I Streams; Phase II Streams; Miscellaneous Streams. Phase I and Phase II Streams were initially addressed in two report. Miscellaneous Streams are subject to the requirements of several milestones identified in the 216 Consent Order. This document constitutes the Categorical State Waste Discharge Permit application for hydrotest,maintenance and construction discharges throughout the Hanford Site. This categorical permit application form was prepared and approved by Ecology.

  13. Using Project Performance to Measure Effectiveness of Quality Management System Maintenance and Practices in Construction Industry

    Directory of Open Access Journals (Sweden)

    Tiong Kung Leong

    2014-01-01

    Full Text Available This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  14. Using project performance to measure effectiveness of quality management system maintenance and practices in construction industry.

    Science.gov (United States)

    Leong, Tiong Kung; Zakuan, Norhayati; Mat Saman, Muhamad Zameri; Ariff, Mohd Shoki Md; Tan, Choy Soon

    2014-01-01

    This paper proposed seven existing and new performance indicators to measure the effectiveness of quality management system (QMS) maintenance and practices in construction industry. This research is carried out with a questionnaire based on QMS variables which are extracted from literature review and project performance indicators which are established from project management's theory. Data collected was analyzed using correlation and regression analysis. The findings indicate that client satisfaction and time variance have positive and significant relationship with QMS while other project performance indicators do not show significant results. Further studies can use the same project performance indicators to study the effectiveness of QMS in different sampling area to improve the generalizability of the findings.

  15. Qualification of technical personnel for employment during construction and operation of the SSC

    International Nuclear Information System (INIS)

    Johnson, C.D.; Wolf, L.J.

    1991-01-01

    In the early stages of the SSC design it became apparent that construction will have a significant impact on post-secondary technical/vocational education in Texas. Present estimates are that from 2,000 to 3,000 employees will be needed in the traditional fields of civil, mechanical, electrical technology, computers as well as exotic technologies such as cryogenics and high vacuum. In this paper an on-going project is described which is directed toward assuring that graduates of Texas post-secondary technical and vocational education programs will be competitive for employment in these jobs. The project involves development of SSC pedagogical material at a level appropriate to the students, education of teachers about the SSC and development of delivery systems for education about the SSC

  16. Construction and maintenance of the Ganges-Brahmaputra-Meghna delta: linking process, morphology, and stratigraphy.

    Science.gov (United States)

    Wilson, Carol A; Goodbred, Steven L

    2015-01-01

    We present a review of the processes, morphology, and stratigraphy of the Ganges-Brahmaputra-Meghna delta (GBMD), including insights gained from detailed elevation data. The review shows that the GBMD is best characterized as a composite system, with different regions having morphologic and stratigraphic attributes of an upland fluvial fan delta; a lowland, backwater-reach delta; a downdrift tidal delta plain; and an offshore subaqueous-delta clinoform. These distinct areas of upland and lowland fluvial reaches and tidal dominance vary in time and space, and we distinguish late-Holocene phases of delta construction, maintenance, and decline similar to delta-lobe cycling in other systems. The overall stability of the GBMD landform, relative to many deltas, reflects the efficient, widespread dispersal of sediment by the large monsoon discharge and high-energy tides that affect this region. However, we do identify portions of the delta that are in decline and losing elevation relative to sea level owing to insufficient sediment delivery. These areas, some of which are well inland of the coast, represent those most at risk to the continued effect of sea-level rise.

  17. PipelineDog: a simple and flexible graphic pipeline construction and maintenance tool.

    Science.gov (United States)

    Zhou, Anbo; Zhang, Yeting; Sun, Yazhou; Xing, Jinchuan

    2018-05-01

    Analysis pipelines are an essential part of bioinformatics research, and ad hoc pipelines are frequently created by researchers for prototyping and proof-of-concept purposes. However, most existing pipeline management system or workflow engines are too complex for rapid prototyping or learning the pipeline concept. A lightweight, user-friendly and flexible solution is thus desirable. In this study, we developed a new pipeline construction and maintenance tool, PipelineDog. This is a web-based integrated development environment with a modern web graphical user interface. It offers cross-platform compatibility, project management capabilities, code formatting and error checking functions and an online repository. It uses an easy-to-read/write script system that encourages code reuse. With the online repository, it also encourages sharing of pipelines, which enhances analysis reproducibility and accountability. For most users, PipelineDog requires no software installation. Overall, this web application provides a way to rapidly create and easily manage pipelines. PipelineDog web app is freely available at http://web.pipeline.dog. The command line version is available at http://www.npmjs.com/package/pipelinedog and online repository at http://repo.pipeline.dog. ysun@kean.edu or xing@biology.rutgers.edu or ysun@diagnoa.com. Supplementary data are available at Bioinformatics online.

  18. Requirements for and prospects of further development of training of personnel for start-up, operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Metke, E.

    1983-01-01

    The results are assessed of the work of training centres and of the training power plant. Since 1979, 1100 persons have undergone training. The planned recruitment quotas have not been fulfilled, the problems being caused by the uneven time distribution of the construction of units of nuclear power plants, the varying quality and number of trainers and tutors; there are problems with simulator training in the USSR. It will be necessary to integrate existing training capacity for all categories of nuclear power plant personnel in one organization unit. (M.D.)

  19. 25 CFR 502.22 - Construction and maintenance of the gaming facility, and the operation of that gaming is...

    Science.gov (United States)

    2010-04-01

    ... 25 Indians 2 2010-04-01 2010-04-01 false Construction and maintenance of the gaming facility, and the operation of that gaming is conducted in a manner which adequately protects the environment and the public health and safety. 502.22 Section 502.22 Indians NATIONAL INDIAN GAMING COMMISSION...

  20. Psychosocial work strain of maintenance personnel during annual outage and normal operation in a nuclear power plant

    International Nuclear Information System (INIS)

    Jacobsson, L.; Svensson, O.

    1991-01-01

    This paper reports on a study which evaluates psychosocial work demands during the annual outage for a maintenance work group in a nuclear power plant. The study is based on a stress paradigm and it has been asserted that increased work strain would have a negative effect on performance. Nineteen workers, aged 20-55 years, participated in the study. The subjects filled out a questionnaire comparing work strain during annual outage and normal operation. During the outage period a 3-shift 24-hour work schedule, including nightwork, was used (working hours during normal operation was 7-16). Increased demands on concentration and vigilance, increased time pressure and strain on social relations within the group were found to characterize work during annual outage. Interestingly, for specific work tasks an association was found between the risk of making errors and high psychological workload. Increased work strain, shiftwork including nightwork and reduced social support are important psychosocial risk factors that might contribute to human error during the outage period

  1. Construction of a test platform for Test Blanket Module (TBM) systems integration and maintenance in ITER Port Cell #16

    Energy Technology Data Exchange (ETDEWEB)

    Vála, Ladislav, E-mail: ladislav.vala@cvrez.cz [Centrum výzkumu Řež, Hlavní 130, 250 68 Husinec-Řež (Czech Republic); Reungoat, Mathieu, E-mail: mathieu.reungoat@cvrez.cz [Centrum výzkumu Řež, Hlavní 130, 250 68 Husinec-Řež (Czech Republic); Vician, Martin [Centrum výzkumu Řež, Hlavní 130, 250 68 Husinec-Řež (Czech Republic); Poitevin, Yves; Ricapito, Italo; Zmitko, Milan; Panayotov, Dobromir [Fusion for Energy, Josep Pla 2, Torres Diagonal Litoral B3, 08019 Barcelona (Spain)

    2015-10-15

    Highlights: • A non-nuclear, full size facility – TBM platform – is under construction in CVR. • It is designed for tests, optimization and validation of TBS maintenance operations. • It will allow testing and validation of specific maintenance tools and RH equipment. • It reproduces ITER Port Cell #16, as well as the TBS interfaces and main equipment. • The TBM platform will be available for full operation in the first half of 2016. - Abstract: This paper describes a project of a non-nuclear, 1:1 scale testing platform dedicated to tests, optimization and validation of integration and maintenance operations for the European TBM systems in the ITER Port Cell #16. This TBM platform is currently under construction in Centrum výzkumu Řež, Czech Republic. The facility is realized within the scope of the SUSEN project and its full operation is foreseen in the first half of 2016.

  2. Predicting maintenance of attendance at walking groups: testing constructs from three leading maintenance theories.

    Science.gov (United States)

    Kassavou, Aikaterini; Turner, Andrew; Hamborg, Thomas; French, David P

    2014-07-01

    Little is known about the processes and factors that account for maintenance, with several theories existing that have not been subject to many empirical tests. The aim of this study was to test how well theoretical constructs derived from the Health Action Process Approach, Rothman's theory of maintenance, and Verplanken's approach to habitual behavior predicted maintenance of attendance at walking groups. 114 participants, who had already attended walking groups in the community for at least 3 months, completed a questionnaire assessing theoretical constructs regarding maintenance. An objective assessment of attendance over the subsequent 3 months was gained. Multilevel modeling was used to predict maintenance, controlling for clustering within walking groups. Recovery self-efficacy predicted maintenance, even after accounting for clustering. Satisfaction with social outcomes, satisfaction with health outcomes, and overall satisfaction predicted maintenance, but only satisfaction with health outcomes significantly predicted maintenance after accounting for clustering. Self-reported habitual behavior did not predict maintenance despite mean previous attendance being 20.7 months. Recovery self-efficacy, and satisfaction with health outcomes of walking group attendance appeared to be important for objectively measured maintenance, whereas self-reported habit appeared not to be important for maintenance at walking groups. The findings suggest that there is a need for intervention studies to boost recovery self-efficacy and satisfaction with outcomes of walking group attendance, to assess impact on maintenance.

  3. Sexual function in F-111 maintenance workers: the study of health outcomes in aircraft maintenance personnel.

    Science.gov (United States)

    Brown, Anthony; Gibson, Richard; Tavener, Meredith; Guest, Maya; D'Este, Catherine; Byles, Julie; Attia, John; Horsley, Keith; Harrex, Warren; Ross, James

    2009-06-01

    In Australia, four formal F-111 fuel tank deseal/reseal (DSRS) repair programs were implemented over more than two decades, each involving different processes and using a range of hazardous substances. However, health concerns were raised by a number of workers. The "Study of Health Outcomes in Aircraft Maintenance Personnel" was commissioned by the Australian Department of Defence to investigate potential adverse health outcomes as a result of being involved in the deseal/reseal processes. To compare measures of sexual function in F-111 aircraft fuel tank DSRS maintenance workers, against two appropriate comparison groups. Exposed and comparison participants completed a postal questionnaire which included general questions of health and health behavior, and two specific questions on sexual functioning. They also completed the International Index of Erectile Function (IIEF) questionnaire. Logistic regression was used to explore exposure status and outcome while adjusting for potential confounders. The three outcomes of interest for this study were the proportion of participants with erectile dysfunction (ED) according to the IIEF, the proportion with self-reported loss of interest in sex, and the proportion with self-reported problems with sexual functioning. Compared with each of the comparison groups, a larger proportion of the exposed group reported sexual problems and were classified as having ED according to the IIEF. In logistic regression, the odds of all three outcomes were higher for exposed participants relative to each comparison group and after adjustment for potentially confounding variables including anxiety and depression. There was a consistent problem with sexual functioning in the exposed group that is not explained by anxiety and depression, and it appears related to DSRS activities.

  4. Construction of the monitoring, processing and logging systems supporting for management, operation and maintenance of the Dalat reactor control system

    International Nuclear Information System (INIS)

    Trinh Dinh Hai; Nguyen Thanh Cuong; Huynh Ton Nghiem; Phan Quoc Minh; Nguyen Duc Tuan; Nguyen Nhi Dien

    2004-01-01

    From 1/2002 to 12/2003, we implemented successfully a project, entitled 'Construction of the monitoring, processing and logging systems supporting for management, operation and maintenance of the Dalat reactor control system' under the assistance of the Ministry of Science and Technology. Its main results such as Testing Apparatus based on microcontroller for all functional boards of the Control Logic System of the Reactor Control System (RCS). Technical support CD - ROM for Process Instrumentation System, software for logging automatically information from important systems of the RCS through LAN, program for failure management of Process Instrumentation System have been playing an important role for observation, operation support, maintenance of the RCS. Through this project, the implementation group has grown up rapidly. The control and instrumentation group has been provided with some modern equipment, electronic components, and materials for maintenance work and research development in the years to come. This paper presents typical results and discussions. (author)

  5. Design and construction of demineralized water production and maintenance system for RA-O nuclear reactor

    International Nuclear Information System (INIS)

    Rumis, D.; Martin, H.R.

    1990-01-01

    The normal operation of zero power RA-O Nuclear Reactor requires a production and maintenance of demineralized water system. This system was designed and built-up during the works for actualization, upgrading and new start up at Cordoba National University of this facility. This paper comments the relevant aspects about the didactical purpose of that system and the details considered for training and practices with it. Similarly, considerations about solids wastes and effluents treatment are discussed. (Author)

  6. On-Line Real-Time Management Information Systems and Their Impact Upon User Personnel and Organizational Structure in Aviation Maintenance Activities.

    Science.gov (United States)

    1979-12-01

    ON USER PERSONNEL AND ORGANIZATINAL STRUCTUREl E REAL-TIME COMPUTER-BASED MANAGEMENT INFORMATION SYSTEM ARE EXPLORED MANAGEMENT INFORMATION SRVICE...PERSONNEL AND ORGANIZATIONAL STRUCTURE IN A LOGY INTO AN ORGANIZATION CAN SIGNIFICANTLY IMPACT THE ORGANIZATION#S EFFECTIVENES ONNEL AND ORGANIZATINAL ...bureau- cracy and bolster upper level leadership . His view considered the computer system informa- tion specialists as support personel only and

  7. Maintenance management balancing performance maintenance and cost balance at reinforced concrete constructions of the fossil-fuel and nuclear power stations

    International Nuclear Information System (INIS)

    Ito, Hiroshi; Benno, Hiroshi; Ozaki, Mitsuhiro

    2003-01-01

    Life elongation of concrete constructions (CCs) is a very important needs for supporting future safe supply of electric power. However, some CCs constructed and used for a long term at fossil-fuel and nuclear power stations had reduction of their required performance by deterioration based on environmental and using conditions represented by salt-damage. As such constructions are anxious to increase in future, it is necessary to keep reliability of their establishments by providing desired rehabilitation to persist supplying effect of their facilities. On the other hand, as it is also essential to progress keeping and reducing cost of power generation together with development of recent liberalization of electric power, it is an important subject how to keep their performance maintenance and cost balance. Therefore, here were outlined on required performance setting method, inspection method, long-term deterioration forecasting and evaluating methods, selection method of countermeasure scenarios minimizing LCC, inspection period setting method, introduction of database and deterioration forecasting system, and so on, to economically maintain and manage already built reinforced concrete constructions at suitable materials and places to elongate their lives. (G.K.)

  8. Personnel preferences in personnel planning and scheduling

    OpenAIRE

    van der Veen, Egbert

    2013-01-01

    Summary The personnel of an organization often has two conflicting goals. Individual employees like to have a good work-life balance, by having personal preferences taken into account, whereas there is also the common goal to work efficiently. By applying techniques and methods from Operations Research, a subfield of applied mathematics, we show that operational efficiency can be achieved while taking personnel preferences into account. In the design of optimization methods, we explicitly con...

  9. MAPPS (Maintenance Personnel Performance Simulation): a computer simulation model for human reliability analysis

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.

    1985-01-01

    A computer model has been developed, sensitivity tested, and evaluated capable of generating reliable estimates of human performance measures in the nuclear power plant (NPP) maintenance context. The model, entitled MAPPS (Maintenance Personnel Performance Simulation), is of the simulation type and is task-oriented. It addresses a number of person-machine, person-environment, and person-person variables and is capable of providing the user with a rich spectrum of important performance measures including mean time for successful task performance by a maintenance team and maintenance team probability of task success. These two measures are particularly important for input to probabilistic risk assessment (PRA) studies which were the primary impetus for the development of MAPPS. The simulation nature of the model along with its generous input parameters and output variables allows its usefulness to extend beyond its input to PRA

  10. The Maintenance Personnel Performance Simulation (MAPPS) model: A human reliability analysis tool

    International Nuclear Information System (INIS)

    Knee, H.E.

    1985-01-01

    The Maintenance Personnel Performance Simulation (MAPPS) model is a computerized, stochastic, task-oriented human behavioral model developed to provide estimates of nuclear power plant (NPP) maintenance team performance measures. It is capable of addressing person-machine, person-environment, and person-person relationships, and accounts for interdependencies that exist between the subelements that make up the maintenance task of interest. The primary measures of performance estimated by MAPPS are: 1) the probability of successfully completing the task of interest and 2) the task duration time. MAPPS also estimates a host of other performance indices, including the probability of an undetected error, identification of the most- and least-likely error-prone subelements, and maintenance team stress profiles during task execution

  11. Community Building Services Training Program: A Model Training Program to Provide Technical Training for Minority Adults in Construction, Building Maintenance,and Property Management. Final Report.

    Science.gov (United States)

    Community Building Maintenance Corp., Chicago, IL.

    A demonstration program, administered by a community based building maintenance, management, and construction corporation, was developed to provide technical training for minority adults in construction, building maintenance, and property management in the Chicago area. The program was concerned with seeking solutions to the lack of housing, job…

  12. Environmental Compliance and Pollution Prevention Training Manual for Campus-Based Organizations--Operational and Facility Maintenance Personnel.

    Science.gov (United States)

    New York State Dept. of Environmental Conservation, Albany.

    This manual was designed to be used as part of the Workshop on Environmental Compliance and Pollution Prevention for campus-based facilities. It contains basic information on New York state and federal laws, rules, and regulations for protecting the environment. The information presented is a summary with emphasis on those items believed to be…

  13. Personnel Policy and Profit

    DEFF Research Database (Denmark)

    Bingley, Paul; Westergård-Nielsen, Niels Chr.

    2004-01-01

    personnel structure variation. It is found that personnel policy is strongly related to economic performance. At the margin, more hires are associated with lower profit, and more separations with higher profit. For the average firm, one new job, all else equal, is associated with ?2680 (2000 prices) lower...

  14. Changing priorities of codes and standards -- quality engineering: Experiences in plant construction, maintenance, and operation

    International Nuclear Information System (INIS)

    Antony, D.D.; Suleski, P.F.; Meier, J.C.

    1994-01-01

    Application of the ASME Code across various fossil and nuclear plants necessitates a Company approach adapted by unique status of each plant. This arises from State Statutes, Federal Regulations and consideration of each plant's as-built history over a broad time frame of design, construction and operation. Additionally, the National Board Inspection Code accompanies Minnesota Statutes for plants owned by Northern States Power Company. This paper addresses some key points on NSP's use of ASME Code as a principal mechanical standard in plant design, construction and operation. A primary resource facilitating review of Code provisions is accurate status on current plant configuration. As plant design changes arise, the Code Edition/Addenda of original construction and installed upgrades or replacements are considered against available options allowed by current standards and dialog with the Jurisdictional Authority. Consistent with the overall goal of safe and reliable plant operation, there are numerous Code details and future needs to be addressed in concert with expected plant economics and planned outages for implementation. The discussion begins in the late 60's with new construction of Monticello and Prairie Island (both nuclear), through Sherburne County Units 1 through 3 (fossil), and their changes, replacements or repairs as operating plants

  15. Personnel preferences in personnel planning and scheduling

    NARCIS (Netherlands)

    van der Veen, Egbert

    2013-01-01

    Summary The personnel of an organization often has two conflicting goals. Individual employees like to have a good work-life balance, by having personal preferences taken into account, whereas there is also the common goal to work efficiently. By applying techniques and methods from Operations

  16. Physical Performance Characteristics of Military Aircraft Maintenance Personnel Resistant to Work-Related Musculoskeletal Disorders of the Hand and Wrist

    National Research Council Canada - National Science Library

    Pekarek, Deanna S

    2006-01-01

    Work related musculoskeletal disorders (WMSD), the largest portion of reported and compensated work-related diseases, represent at least one-third of all reported occupational diseases in the United States, Nordic countries, and Japan...

  17. Environmental Assessment for the Proposed Construction and Operation of New Vehicle Maintenance Facility

    Science.gov (United States)

    2007-08-01

    reasonably foreseeable future actions regardless of what agency (federal or non-federal) or person undertakes such actions” (40 CFR 1508.7). Cumulative... clubhouse /pool and playgrounds. MFH 734,789 and Clughouse 22,500 sf (Under Construction) 70,355 757,298 Yes (05) 05 1500 Army Aviation Support

  18. System reliability as perceived by maintenance personnel on petroleum production facilities

    International Nuclear Information System (INIS)

    Antonovsky, A.; Pollock, C.; Straker, L.

    2016-01-01

    The aim of this research was to understand the relationship between maintenance staff perceptions of organisational effectiveness and operational reliability in petroleum operations. Engineering measures exist that assess the effectiveness of maintenance and reliability of equipment. These measures are typically retrospective and may not provide insight into what impedes system reliability. Perceptions of organisational effectiveness by the workforce may provide a predictive measure that could improve our understanding of the human factors that influence system reliability. Maintenance personnel (n=133) from nine petroleum production facilities completed a survey as part of a study of human factors and maintenance reliability. 69 respondents (51.9%) provided comments to an open-ended question in the survey, and these data were analysed using Interpretive Phenomenological Analysis to extract themes. Four super-ordinate themes were identified from the analysis: 1) Communication and access to information, 2) Efficiency of current work systems, 3) Need for better workgroup support, and 4) Management impacts on the workplace. We found a significant relationship between the frequency of the four super-ordinate themes and the facility reliability level as measured by ‘Mean Time Between Failures’: χ"2(6,N=158)=16.2, p=.013. These results demonstrated that operational effectiveness might be differentiated on the basis of survey-derived perceptions of maintenance personnel. - Highlights: • Thematic analysis of survey comments provided insights into workplace reliability • Worker’s comments on reliability related to technical data on time between failures • Management decision-making was the main theme in the lower reliability workplaces • Improving efficiency was the main theme in the higher reliability workplaces • Communication and better workgroup support were themes at all reliability levels

  19. Operation and maintenance manual for septic holding tank system for project W-519, two double-wide construction support trailers

    International Nuclear Information System (INIS)

    MORTIMER, C.S.

    1999-01-01

    This manual was prepared to provide detailed information for the operation and maintenance of the sanitary wastewater holding system. It sets forth system operation and maintenance as well as failure response procedures

  20. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    International Nuclear Information System (INIS)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun

    2009-01-01

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors

  1. Maintenance Support System Development for Maintenance Personnel in Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Yim, Ho Bin; Kim, In; Lee, Seung Min; Seong, Poong Hyun [Korea Advanced Institute of Science and Technology, Daejeon (Korea, Republic of)

    2009-05-15

    As plants or factories get old, the number of maintenance activities increases, and so does the necessity of maintenance itself. Industries have adopted the latest technologies such as RFID, wireless sensor networking, and augmented reality to develop systems which increase human performances as well as productivity. Due to safety related concerns, nuclear power industries have been reluctant to use these fancy technologies. However, from the economics point of view, it is necessary to take advantages of novel technologies. This empirical study considers not only ergonomics view, but also the economics view when building maintenance support systems. This paper introduces brief features of five subsystems which were built to reduce human errors and advantages when each system successfully reduces those human errors.

  2. 47 CFR 80.1074 - Radio maintenance personnel for at-sea maintenance.

    Science.gov (United States)

    2010-10-01

    ... maintenance. 80.1074 Section 80.1074 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES STATIONS IN THE MARITIME SERVICES Global Maritime Distress and Safety... Global Maritime Distress and Safety System related to Sea Areas A3 and A4. [57 FR 9065, Mar. 16, 1992, as...

  3. Automation of a Versatile Crane (the LSMS) for Lunar Outpost Construction, Maintenance and Inspection

    Science.gov (United States)

    Doggett, William R.; Roithmayr, Carlos M.; Dorsey, John T.; Jones, Thomas C.; Shen, Haijun; Seywald, Hans; King, Bruce D.; Mikulas, Martin M., Jr.

    2009-01-01

    Devices for lifting, translating and precisely placing payloads are critical for efficient Earth-based construction operations. Both recent and past studies have demonstrated that devices with similar functionality will be needed to support lunar outpost operations. Although several designs have been developed for Earth based applications, these devices lack unique design characteristics necessary for transport to and use on the harsh lunar surface. These design characteristics include: a) lightweight components, b) compact packaging for launch, c) automated deployment, d) simple in-field reconfiguration and repair, and e) support for tele-operated or automated operations. Also, because the cost to transport mass to the lunar surface is very high, the number of devices that can be dedicated to surface operations will be limited. Thus, in contrast to Earth-based construction, where many single-purpose devices dominate a construction site, a lunar outpost will require a limited number of versatile devices that provide operational benefit from initial construction through sustained operations. The first generation test-bed of a new high performance device, the Lunar Surface Manipulation System (LSMS) has been designed, built and field tested. The LSMS has many unique features resulting in a mass efficient solution to payload handling on the lunar surface. Typically, the LSMS device mass is estimated at approximately 3% of the mass of the heaviest payload lifted at the tip, or 1.8 % of the mass of the heaviest mass lifted at the elbow or mid-span of the boom for a high performance variant incorporating advanced structural components. Initial operational capabilities of the LSMS were successfully demonstrated during field tests at Moses Lake, Washington using a tele-operated approach. Joint angle sensors have been developed for the LSMS to improve operator situational awareness. These same sensors provide the necessary information to support fully automated operations

  4. Maintenance Personnel Performance Simulation (MAPPS) model: a human reliability analysis tool

    International Nuclear Information System (INIS)

    Knee, H.E.

    1985-01-01

    The Maintenance Personnel Performance Simulation (MAPPS) model is a computerized, stochastic, task-oriented human behavioral model developed to provide estimates of nuclear power plant (NPP) maintenance team performance measures. It is capable of addressing person-machine, person-environment, and person-person relationships, and accounts for interdependencies that exist between the subelements that make up the maintenance task of interest. The primary measures of performance estimated by MAPPS are: (1) the probability of successfully completing the task of interest; and (2) the task duration time. MAPPS also estimates a host of other performance indices, including the probability of an undetected error, identification of the most- and least-likely error-prone subelements, and maintenance team stress profiles during task execution. The MAPPS model was subjected to a number of evaluation efforts that focused upon its practicality, acceptability, usefulness, and validity. Methods used for these efforts included a case method approach, consensus estimation, and comparison with observed task performance measures at a NPP. Favorable results, such as close agreement between task duration times for two tasks observed in the field (67.0 and 119.8 minutes, respectively), and estimates by MAPPS (72.0 and 124.0 minutes, respectively) enhance the confidence in the future use of MAPPS. 8 refs., 1 fig

  5. Hearing status among aircraft maintenance personnel in a commercial airline company

    Directory of Open Access Journals (Sweden)

    Greta Smedje

    2011-01-01

    Full Text Available The aim was to study subjective and objective hearing loss in a population of aircraft maintenance workers and identify predictors. A total of 327 aircraft maintenance personnel answered a self-administered work environment questionnaire (response rate 76% and underwent audiometric test. The mean values for the hearing threshold at 3, 4, and 6 kHz for the ear with the most hearing loss were compared with a Swedish population database of persons not occupationally exposed to noise. Equivalent noise exposure during a working day was measured. Relationships between subjective and objective hearing loss and possible predictors (age, years of employment, self-reported exposure to solvents, blood pressure, and psycho-social factors were analyzed by multiple logistic regression. At younger ages (<40 years, aircraft maintenance workers had higher hearing thresholds (1-3 dB compared to the reference group, but such a difference was not found in older employees. Relationships were found between age and objective hearing loss, and between exposure to solvents and reported subjective hearing loss. Equivalent noise exposure during working days were 70-91 dB(A with a maximal noise level of 119 dB(A. Aircraft maintenance workers are exposed to equivalent noise levels above the Swedish occupational standard, including some very high peak exposures. Younger employees have a higher age-matched hearing threshold level compared with a reference group. Thus, there is a need for further preventive measures.

  6. Methodical foundations of the preparation of highly valued personnel for high-rise construction

    Science.gov (United States)

    Belyaeva, Svetlana; Belyantseva, Oksana; Safonova, Nataliya; Vasilyeva, Olga

    2018-03-01

    When carrying out design and survey and construction and installation works for such an innovative type of activity as high-rise construction, the problem of personnel qualification becomes urgent. The article poses a research problem, identifies the main reasons for the need for training highly qualified specialists in construction, and suggests areas for improving training. The expediency of development of mentoring system was proved, the corresponding model of interaction between educational institutions and construction enterprises was offered, key interaction effects were evaluated.

  7. Significant advantages of the safety-first concept in construction, operation, and maintenance of the Westinghosue AP1000 reactor

    International Nuclear Information System (INIS)

    Cummins, E.; Benitz, K.

    2004-01-01

    In June 2003, the U.S. Nuclear Regulatory Commission (USNRC) published a draft opinion about safety of the AP1000 Westinghouse pressurized water reactor with 'passive safety' features. The report constitutes an important milestone in the development of the next generation of safe and cost-efficient nuclear power plants. A new AP1000 can be absolutely competitive with fossil fired power plants and may be able to revive the construction of new nuclear power plants worldwide. The reason for designing the AP1000 were safety considerations. The use of passive safety systems at the same time entails a considerable reduction in the costs of design, maintenance, and operation of an AP1000 plant. Independent experts confirmed that an AP1000 can be erected within three years or even less. The estimated electricity generating costs of an AP1000 plant in the United States amount to US Cent 3.2 to 3.6 per kilowatthour. (orig.)

  8. Environmental impact assessment of wood ash utilization in forest road construction and maintenance--A field study.

    Science.gov (United States)

    Oburger, Eva; Jäger, Anna; Pasch, Alexander; Dellantonio, Alex; Stampfer, Karl; Wenzel, Walter W

    2016-02-15

    The ever increasing use of wood material as fuel for green energy production requires innovative, environmentally safe strategies for recycling of the remaining wood ash. Utilizing wood ash in forest road construction and maintenance to improve mechanical stability has been suggested as a feasible recycling option. To investigate the environmental impact of wood ash application in forest road maintenance, a two-year field experiment was conducted at two Austrian forest sites (Kobernausserwald (KO) (soil pH 5.5) and Weyregg (WE) (pH 7.7)) differing in their soil chemical properties. Two different ashes, one produced by grate incineration (GA) and the other by fluidized bed incineration in a mixture with 15 vol% burnt lime (FBA), were incorporated in repeated road sections at a 15:85% (V/V) ash-to-soil rate. Leaching waters from the road body were collected and analyzed for 32 environmentally relevant parameters over two years. Upon termination of the experiment, sub-road soil samples were collected and analyzed for ash-related changes in soil chemistry. Even though a larger number of parameters was affected by the ash application at the alkaline site (WE), we observed the most pronounced initial increases of pH as well as Al, As, Fe, Mn, Ni, Co, Cu, Mo, and NO2(−) concentrations in leachates beneath GA-treated road bodies at Kobernausserwald due to the lower soil buffer capacity at this site. Despite the observed effects our results indicate that, when specific requirements are met (i.e. appropriate ash quality, sufficient soil buffer capacity below the road body, and single time-point ash incorporation within several decades), wood ash application in forest road construction is generally environmentally acceptable.

  9. Development of an intellectual maintenance management system. Development of trouble detection and troubleshooting evaluation system

    International Nuclear Information System (INIS)

    Suda, Kazunori; Yoshikawa, Shinji; Tani, Satoshi

    1998-03-01

    Many research activities are conducted to enhance cost performance and safety of nuclear power plants operation and maintenance. Concept of autonomous operating system to equal the role of operators and of maintenance personnel with artificial intelligence and autonomous robots has been developed. An intellectual maintenance management system has been developed to be equipped with decision making functions of maintenance personnel. The intellectual maintenance management system is in charge of maintenance function of an autonomous plant, which consists of plant-wide monitoring, evaluation of component integrity, and scheduling of maintenance activities. In other words, this system should be equipped with preventive maintenance and corrective maintenance functions those are currently loaded on personnel. In this report, we discussed condition monitoring maintenance in the preventive maintenance. We also reported a sensor validation system development for machinery condition monitoring and diagnosis. We adopted distributed and cooperative system construction technique, which is expected recently in applications to large-scale plants. This system has inter-agent communication function for signal transmission and reception among distributed physics models of machineries. The system has been constructed for water/steam system of the LMFBR power plant. The system has been validated to be capable of cooperative sensor validation by the distributed set of agents, with quantitative indication of sensor deviation based on a newly developed fuzzy algorithm with inter-agent cooperation. The derived reference parameter value from the inter-agent evaluations also stands for the alternative measurement to the malfunctioned sensor. (author)

  10. Study on Oxygen Supply Standard for Physical Health of Construction Personnel of High-Altitude Tunnels

    Directory of Open Access Journals (Sweden)

    Chun Guo

    2015-12-01

    Full Text Available The low atmospheric pressure and low oxygen content in high-altitude environment have great impacts on the functions of human body. Especially for the personnel engaged in complicated physical labor such as tunnel construction, high altitude can cause a series of adverse physiological reactions, which may result in multiple high-altitude diseases and even death in severe cases. Artificial oxygen supply is required to ensure health and safety of construction personnel in hypoxic environments. However, there are no provisions for oxygen supply standard for tunnel construction personnel in high-altitude areas in current tunnel construction specifications. As a result, this paper has theoretically studied the impacts of high-altitude environment on human bodies, analyzed the relationship between labor intensity and oxygen consumption in high-altitude areas and determined the critical oxygen-supply altitude values for tunnel construction based on two different standard evaluation systems, i.e., variation of air density and equivalent PIO2. In addition, it has finally determined the oxygen supply standard for construction personnel in high-altitude areas based on the relationship between construction labor intensity and oxygen consumption.

  11. Final Environmental Assessment: Construction of Maintenance and Storage Facility, Perimeter Fence Upgrade and Demolition of Three Buildings and Two Structures Gila River Air Force Space Surveillance Station Arizona

    Science.gov (United States)

    2012-11-01

    Estrella mountain range is approximately six miles west of the Installation and the Sacaton mountain range lie approximate- ly six miles to the southeast...Structures 3-4 Figure 5. Geological Map of Gila River AFSSS and Vicinity Sierra Estrella Range Sacaton Range EA — Construct Maintenance & Storage

  12. Human factor analysis and preventive countermeasures of maintenance in nuclear power plant

    International Nuclear Information System (INIS)

    Zhang Li; Hu Chao

    2008-01-01

    Based on the human error analysis theory and the characteristics of maintenance in a nuclear power plant, human factors of maintenance in NPP are divided into three different areas: human, technology, and organization, in which human refers to the individual factors, mainly including psychological quality, physiological characteristic, state of health, knowledge, skill level, and interpersonal relationship. Technology includes the maintenance technology, maintenance strategy, maintenance tool, maintenance interface, maintenance regulation, and work environment. Organization includes task arrangement, information communication, training, personnel external environment, team construction, and leadership. The analysis also reveals that the organization factors, which can indirectly influence personnel performance, are the primary initiators of human error. Based on these, some countermeasures are brought forward in order to reduce human errors. (authors)

  13. Planning and management support for NPP personnel SAT-based training programmes

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    Planning and management support for NPP personnel SAT-based training programmes is described for the following job positions: reactor operator; turbine operator; reactor maintenance worker; pump maintenance worker; chemistry foreman; health physics foreman; electric maintenance worker

  14. Application of Mobile Laser Scanning for Lean and Rapid Highway Maintenance and Construction

    Science.gov (United States)

    2015-08-28

    Mobile Terrestrial Laser Scanning (MTLS) is an emerging technology that combines the use of a laser scanner(s), the Global Navigation Satellite System (GNSS), and an Inertial Measurement Unit (IMU) on a vehicle to collect geo-spatial data. The overal...

  15. Personnel policy and management

    International Nuclear Information System (INIS)

    Dangelmaier, P.

    1986-01-01

    In the field of personnel policy and management two main points must be considered and fitted together: the aspects of the applicant and the aspects of the utility. The applicant wishes a position which suits to his abilities, education, training, experience and self-evaluation. The enterprise has beside these qualification criteria to look to some additional points: reliability - not only in the profession of the applicant but also in his daily life. In this examination licensing authorities are involved too; responsibility in a very broad sense and the ability to make correct decisions sometimes under stress situations. (orig.)

  16. Personnel training and certification

    International Nuclear Information System (INIS)

    Whittemore, W.L.

    1976-01-01

    In order to make the full benefits of neutron radiography available in the nondestructive test (NDT) field, it has been necessary to formalize its application. A group under the Penetrating Radiation Committee of the American Society for Nondestructive Testing (ASNT) was organized to prepare a recommended practice for neutron radiography. The recommended practices require the establishment of an appropriate certification program. The requirements on the employer to establish and maintain a qualification and certification program are outlined. To conduct a program of nondestructive testing using neutron radiography requires the usual three levels of qualified and certified personnel. The program is administered by a Level III person. Routine exposure, reviews, and reporting of test results are the responsibilities of Level I and Level II personnal. The amount of training and nature of the required practical examination are also specified. The recommended practices document assures users that NDT work in the field of neutron radiography is performed by qualified personnel. Although no training courses are available to provide experience in the depth required by the recommended practices document, SNT-TC-1A, short courses are provided at a number of locations to familarize user's representatives with the interpretation of neutron radiographs and capabilities and limitations of the technique

  17. Waterproofing with polymeric geo synthetic barriers (GBR-P) in the manual for the design, construction, management and maintenance of reservoirs

    International Nuclear Information System (INIS)

    Blanco, M.; Cea, J. C.; Garcia, F.; Sanchez, F. J.; Castillo, F.; Mora, J.; Crespo, M. A.

    2010-01-01

    This article presents a part of Manual for the Design, Construction, Management and Maintenance of Reservoirs relative to waterproofing with Polymeric Geo synthetic Barriers (GBR-P). the nature materials of geo membranes is studied also theirs characteristics and specifications. (Author) 26 refs.

  18. Relating the construction and maintenance of maternal ill-health in rural Indonesia

    Directory of Open Access Journals (Sweden)

    Lucia D'Ambruoso

    2012-08-01

    Full Text Available Estimates suggest that over 350,000 deaths and more than 20 million severe disabilities result from the complications of pregnancy, childbirth or its management each year. Death and disability occur predominately among disadvantaged women in resource-poor settings and are largely preventable with adequate delivery care. This paper presents the substantive findings and policy implications from a programme of PhD research, of which the overarching objective was to assess quality of, and access to, care in obstetric emergencies. Three critical incident audits were conducted in two rural districts on Java, Indonesia: a confidential enquiry, a verbal autopsy survey, and a community-based review. The studies examined cases of maternal mortality and severe morbidity from the perspectives of local service users and health providers. A range of inter-related determining factors was identified. When unexpected delivery complications occurred, women and families were often uninformed, unprepared, found care unavailable, unaffordable, and many relied on traditional providers. Midwives in villages made important contributions by stabilising women and facilitating referrals but were often scarce in remote areas and lacked sufficient clinical competencies and payment incentives to treat the poor. Emergency transport was often unavailable and private transport was unreliable and incurred costs. In facilities, there was a reluctance to admit poorer women and those accepted were often admitted to ill-equipped, under-staffed wards. As a result, referrals between hospitals were also common. Otherwise, social health insurance, designed to reduce financial barriers, was particularly problematic, constraining quality and access within and outside facilities. Health workers and service users provided rich and explicit assessments of care and outcomes. These were used to develop a conceptual model in which quality and access are conceived of as social processes

  19. 32 CFR 553.13 - Standards of construction, maintenance, and operations.

    Science.gov (United States)

    2010-07-01

    ... considered in relation to budgetary reviews within the Department of the Army: (a) As permanent national...) Accomodations and services provided to the next of kin of the honored dead and to the general public will be of...

  20. Construction of Graphic Symbol Sequences by Preschool-Aged Children: Learning, Training, and Maintenance

    Science.gov (United States)

    Poupart, Annick; Trudeau, Natacha; Sutton, Ann

    2013-01-01

    The use of augmentative and alternative communication systems based on graphic symbols requires children to learn to combine symbols to convey utterances. The current study investigated how children without disabilities aged 4 to 6 years (n = 74) performed on a simple sentence (subject-verb and subject-verb-object) transposition task (i.e., spoken…

  1. Empowering markets?: The construction and maintenance of a deregulated market for electricity in Norway

    Energy Technology Data Exchange (ETDEWEB)

    Karlstrom, Henrik

    2012-07-01

    Contrary to some claims, deregulation is not just a technical affair, but encapsulates a range of political and social changes to a system. The four papers that comprise this thesis explore some of these changes empirically through interviews, reading of policy documents and public discourse as well as a large electricity user survey in order to capture as much as possible of the affected surrounding areas of deregulation. Theoretically, it debates some notions of how individuals are affected by and supposed to react to the emergence of a new market in addition to the question of how important scientific theory and advice is to real-life policies. While there are a myriad of ways of presenting this quite diverse material, I have chosen to frame it by highlighting three themes: the professional background of the people implementing deregulation, the changes in expectation of how users of electricity should behave and the uncertainty that arises when there are problems in a system that is supposed to work without regulation. The first of these themes, dealt with in the first paper presented, is in line with classical political science and institutional sociology. In order to understand how policy comes about it is not enough to just study the documents that are passed in parliament - one must also look at who is passing them, who drafted them and who is responsible for implementing the policies contained within them. Often, professional interests or specific institutional arrangements can impact the end results in otherwise transparent procedures. The second theme deals with the configuration of users of electricity. A tenet of neoclassical economic thought that has been much criticised is the idea of the rational, utility maximising actor who carefully calculates returns before taking any action. While serious economic theory is beginning to move away from this vision of human action, there is no denying that market liberalism relies on the considered choice of

  2. Construction and Maintenance of Classroom Aquaria. Marine Science Curriculum Aid No. 2.

    Science.gov (United States)

    Lee, Richard S.

    This manual introduces teachers to the biological systems at work in a marine aquarium. It provides guidance in selection of the tanks, specifically discussing the effect of capacity on the well-being of the occupants. It guides the teacher in setting up aeration, filtering, lighting, and temperature control for the aquarium. It also advises on…

  3. 75 FR 48408 - Issuance of a Presidential Permit Authorizing the Construction, Operation, and Maintenance of the...

    Science.gov (United States)

    2010-08-10

    ... mail at Office of Mexican Affairs--Room 3909, Department of State, 2201 C St., NW., Washington, DC... Secretary's delegate, the United States shall have the right to enter upon and take possession of any of the... control to the permittee. In the event that the United States shall exercise such right, it shall pay to...

  4. IAEA activities on NPP personnel training and qualification

    International Nuclear Information System (INIS)

    Kossilov, A.

    1998-01-01

    Activities of IAEA concerning training and qualification of NPP personnel consider the availability of sufficient number of competent personnel which is one of the most critical requirements for safe and reliable NPP operation and maintenance. Competence of personnel is essential for reducing the frequency of events connected to human errors and equipment failures. The IAEA Guidebook on Nuclear Power Plant Personnel Training and its Evaluation incorporates the experience gained worldwide and provides recommendations on the use of SAT being the best practice for attaining and maintaining the qualification and competence of NPP personnel and for quality assurance of training

  5. Effects of Shiftwork on Air Force Aircraft Maintenance Personnel

    National Research Council Canada - National Science Library

    Campbell, Craig

    1998-01-01

    .... Health and well being, on- and off-duty accident rates, day shift vs. night shift accident rates, and the effects of stress and fatigue on specific satisfactions, job dissatisfaction, and reenlistment intentions were examined...

  6. Maintenance Personnel Performance Simulation (MAPPS) model. Users' Manual

    International Nuclear Information System (INIS)

    Kopstein, F.F.; Wolf, J.J.

    1985-09-01

    This report (MAPPS User's Manual) is the last report to be published from this program and provides detailed guidelines for utilization of the MAPPS model. Although the model has been developed to be highly user-friendly and provides interactive means for controlling and running of the model, the user's manual is provided as a guide for the user in the event clarification or direction is required. The user will find that in general the model requires primarily user input that is self explanatory. Once initial familiarization with the model has been achieved by the user, the amount of interaction between the user's manual and the computer model will be minimal. It is suggested however that even the experienced user keep the user's manual handy for quick reference. 5 refs., 10 figs., 7 tabs

  7. An Approach for Measuring Reductions in Operations, Maintenance, and Energy Costs: Baseline Measures of Construction Industry Practices for the National Construction Goals.

    Science.gov (United States)

    Chapman, Robert E.; Rennison, Roderick

    The Construction and Building Subcommittee of the National Science and Technology Council (NSTC) has established seven National Construction Goals for the construction industry and is developing baseline measures for current practices and progress with respect to each goal. This document provides a detailed set of baseline measures for the NSTC…

  8. Safety and maintenance engineering: A compilation

    Science.gov (United States)

    1974-01-01

    A compilation is presented for the dissemination of information on technological developments which have potential utility outside the aerospace and nuclear communities. Safety of personnel engaged in the handling of hazardous materials and equipment, protection of equipment from fire, high wind, or careless handling by personnel, and techniques for the maintenance of operating equipment are reported.

  9. Void Fraction Instrument operation and maintenance manual

    International Nuclear Information System (INIS)

    Borgonovi, G.; Stokes, T.I.; Pearce, K.L.; Martin, J.D.; Gimera, M.; Graves, D.B.

    1994-09-01

    This Operations and Maintenance Manual (O ampersand MM) addresses riser installation, equipment and personnel hazards, operating instructions, calibration, maintenance, removal, and other pertinent information necessary to safely operate and store the Void Fraction Instrument. Final decontamination and decommissioning of the Void Fraction Instrument are not covered in this document

  10. Environmental Assessment for Demolition and Construction of Military Personnel Support Facilities Kirtland Air Force Base, New Mexico

    Science.gov (United States)

    2010-07-01

    Randolph Avenue, between Truman and Eileen Streets.  Dormitory Campus 2 located on the west side of the Base between Sherman and Lowry Avenues and...Rhinocheilus lecontei SS K desert massasauga Sistrurus catenatus spp. edwardsii SS K gray vireo Vireo vicinior ST K burrowing owl Athene cunicularia...Street.  NCO Academy located east of the flight line south of Biggs Avenue and north of Randolph Avenue, between Truman and Eileen Streets.  Dormitory

  11. PERSONNEL COSTS IN THE CZECH CONSTRUCTION SECTOR: INVESTIGATING THE EFFECT OF COMPANY SIZE

    Directory of Open Access Journals (Sweden)

    Martina Paulišová

    2017-01-01

    Full Text Available : Managing personnel costs is important in all companies, especially in those whose production is labor intensive. The construction sector therefore qualifies as a suitable area for analyzing issues associated with these costs. The aim of this study is to find out whether company size affects personnel cost management under various circumstances. Four research hypotheses focus on the relationships among and the relative importance of personnel costs, use of standards, range of employee benefits offered, and economic actions taken when faced with an economic crisis. The evaluation of hypotheses is supported by using the chi-square test of independence with the aim of confirming or rejecting the statistical significance of relationships between the examined categorical variables. Results have confirmed a significant effect of company size. Several research implications and suggested future research directions are also presented in the conclusion of this paper.

  12. Extension of the maintenance cycle of HEPA filters by optimization of the technical characteristics of filters and their construction

    International Nuclear Information System (INIS)

    Bella, H.; Stiehl, H.H.; Sinhuber, D.

    1977-01-01

    The knowledge of the parameters of HEPA filters used at present in nuclear plants allows optimization of such filters with respect to flow rate, pressure drop and service life. The application of optimizing new types of HEPA filters of improved performance is reported. The calculated results were checked experimentally. The use of HEPA filters optimized with respect to dust capacity and service life, and the effects of this new type of filter on the reduction of operating and maintenance costs are discussed

  13. Preventive maintenance and reliability-centered maintenance

    International Nuclear Information System (INIS)

    Anderson, J.G.

    1989-01-01

    In the recent past, the primary function of the preventive maintenance program at a nuclear power plant was to maintain the operability and reliability of the plant. Reducing overall maintenance costs by performing effective preventive maintenance, instead of more costly and disruptive corrective maintenance, instead of more costly and disruptive corrective maintenance, was a secondary consideration. In today's operating environment, the preventive maintenance program must meet the test of cost-effectiveness as well as many new standards for performance that are being required by rate regulators. The preventive maintenance program must be able to withstand the challenge of independent audit to a new standard of technical adequacy and compliance with recommendations from component vendors. In this new environment, the standard that is being applied at the San Onofre nuclear generating station (SONGS) is that the preventive maintenance program must meet the test of cost-effectiveness, improve equipment performance, support increased plant availability, and (a) literally implement the recommendations of the vendor, (b) provide other compensation for the vendor recommendation, or (c) provide technical justification for the deviation. The subject of this paper is the way that reliability-centered maintenance (RCM) is helping SONGS meet these challenges

  14. Nuclear maintenance and management system

    International Nuclear Information System (INIS)

    Yamaji, Yoshihiro; Abe, Norihiko

    2000-01-01

    The Mitsubishi Electric Co., Ltd. has developed to introduce various computer systems for desk-top business assistance in a power plant such as system isolation assisting system, operation parameter management system, and so on under aiming at business effectiveness since these ten and some years. Recently, by further elapsed years of the plants when required for further cost reduction and together with change of business environment represented by preparation of individual personal computer, further effectiveness, preparation of the business environment, and upgrading of maintenance in power plant business have been required. Among such background, she has carried out various proposals and developments on construction of a maintenance and management system integrated the business assistant know-hows and the plant know-hows both accumulated previously. They are composed of three main points on rationalization of business management and document management in the further effectiveness, preparation of business environment, TBM maintenance, introduction of CBM maintenance and introduction of maintenance assistance in upgrading of maintenance. Here was introduced on system concepts aiming at the further effectiveness of the nuclear power plant business, preparation of business environment, upgrading of maintenance and maintenance, and so on, at a background of environment around maintenance business in the nuclear power plants (cost-down, highly elapsed year of the plant, change of business environment). (G.K)

  15. Carbon footprint comparison of innovative techniques in the construction and maintenance of road infrastructure in The Netherlands

    NARCIS (Netherlands)

    Keijzer, E.E.; Leegwater, G.A.; Vos-Effting, S.E. de; Wit, M.S. de

    2015-01-01

    The ambition of European countries to reduce their national greenhouse gas emissions, has been translated in the Netherlands in green procurement policy of the national road administration. An increasing amount of innovative techniques and approaches in road infrastructure construction and

  16. Personnel Investigations and Clearance Tracking (OPI)

    Data.gov (United States)

    Office of Personnel Management — Security file-related information for the U.S. Office of Personnel Management (OPM)'s employee and contractor personnel. The data is OPM-specific, not government-wide.

  17. Model of a Nuclear Security Naval Agency for radiation control of the Industrial Complex of of Submarine Construction and Maintenance Ship with Nuclear Propulsion

    International Nuclear Information System (INIS)

    Lins Junior, Amilton de Sousa

    2017-01-01

    Due to the construction, by Brazilian Navy, of a Submarine Construction and Maintenance Ship with Nuclear Propulsion, where, among other activities, the commissioning and exchange of the fuel elements of the reactor in the future Nuclear Submarine, and of a Naval Base where the Nuclear Submarine and the Conventional Submarines, it is necessary the establishment of a Nuclear Security Naval Agency to monitor activities involving ionizing radiation sources and nuclear materials aimed at the radiological protection of exposed occupationally individuals (IOE), the general public and the environment. It should be noted that nuclear and radioactive material will be present only in a part of the yard called Radiological Complex. Therefore, the development of a structure for the control of the Radiological Complex is fundamental, considering that the future licensing process will be unprecedented in Brazil and will face several difficulties. This work presents a model of a structure for the radiological control of the industrial complex for the construction and maintenance of the submarine with nuclear propulsion, as well as the fundamental concepts of the activities, such as inspection, regulations and authorizations, to be carried out by the various component sectors of the Nuclear Security Naval Agency. (author)

  18. TPX remote maintenance and shielding

    International Nuclear Information System (INIS)

    Rennich, M.J.; Nelson, B.E.

    1994-01-01

    The Tokamak Physics Experiment machine design incorporates comprehensive planning for efficient and safe component maintenance. Three programmatic decisions have been made to insure the successful implementation of this objective. First, the tokamak incorporates radiation shielding to reduce activation of components and limit the dose rate to personnel working on the outside of the machine. This allows most of the ex-vessel equipment to be maintained through conventional ''hands-on'' procedures. Second, to the maximum extent possible, low activation materials will be used inside the shielding volume. This resulted in the selection of Titanium (Ti-6Al-4V) for the vacuum vessel and PFC structures. The third decision stipulated that the primary in-vessel components will be replaced or repaired via remote maintenance tools specifically provided for the task. The component designers have been given the responsibility of incorporating maintenance design and for proving the maintainability of the design concepts in full-scale mockup tests prior to the initiation of final fabrication. Remote maintenance of the TPX machine is facilitated by general purpose tools provided by a special purpose design team. Major tools will include an in-vessel transporter, a vessel transfer system and a large component transfer container. In addition, tools such as manipulators and remotely operable impact wrenches will be made available to the component designers by this group. Maintenance systems will also provide the necessary controls for this equipment

  19. A course in constructing effective displays of data for pharmaceutical research personnel.

    Science.gov (United States)

    Bradstreet, Thomas E; Nessly, Michael L; Short, Thomas H

    2013-01-01

    Interpreting data and communicating effectively through graphs and tables are requisite skills for statisticians and non-statisticians in the pharmaceutical industry. However, the quality of visual displays of data in the medical and pharmaceutical literature and at scientific conferences is severely lacking. We describe an interactive, workshop-driven, 2-day short course that we constructed for pharmaceutical research personnel to learn these skills. The examples in the course and the workshop datasets source from our professional experiences, the scientific literature, and the mass media. During the course, the participants are exposed to and gain hands-on experience with the principles of visual and graphical perception, design, and construction of both graphic and tabular displays of quantitative and qualitative information. After completing the course, with a critical eye, the participants are able to construct, revise, critique, and interpret graphic and tabular displays according to an extensive set of guidelines. Copyright © 2013 John Wiley & Sons, Ltd.

  20. Suncor maintenance and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Little, S. [Suncor Energy, Calgary, AB (Canada)

    2006-07-01

    Fleet maintenance and reliability at Suncor Energy was discussed in this presentation, with reference to Suncor Energy's primary and support equipment fleets. This paper also discussed Suncor Energy's maintenance and reliability standard involving people, processes and technology. An organizational maturity chart that graphed organizational learning against organizational performance was illustrated. The presentation also reviewed the maintenance and reliability framework; maintenance reliability model; the process overview of the maintenance and reliability standard; a process flow chart of maintenance strategies and programs; and an asset reliability improvement process flow chart. An example of an improvement initiative was included, with reference to a shovel reliability review; a dipper trip reliability investigation; bucket related failures by type and frequency; root cause analysis of the reliability process; and additional actions taken. Last, the presentation provided a graph of the results of the improvement initiative and presented the key lessons learned. tabs., figs.

  1. Conditions for selection, training and placement of personnel

    International Nuclear Information System (INIS)

    Chrkavy, L.

    1983-01-01

    Methods applied in the choice of personnel include: the assessment of personnel files, references, interviews, examinations, long-term observation of the respective person. Investment intents go hand in hand with the concept of labour demands. The planned employment of personnel takes place from the very beginning of the construction of the power plant. At the Bohunice V-1 nuclear power plant 23 university graduates, 29 secondary school graduates and 64 graduates of vocational schools were employed every year. Social measures and complex care are being implemented. Personnel is being selected also on the basis of an assessment of their psychic qualities which are very important in view of the high personal and social responsibility of nuclear power plant personnel. The high technical standard of the equipment places high demands on the education level of all personnel, high demands on training, high remuneration and high level of allround care of personnel. (M.D.)

  2. Software evolution and maintenance

    CERN Document Server

    Tripathy, Priyadarshi

    2014-01-01

    Software Evolution and Maintenance: A Practitioner's Approach is an accessible textbook for students and professionals, which collates the advances in software development and provides the most current models and techniques in maintenance.Explains two maintenance standards: IEEE/EIA 1219 and ISO/IEC14764Discusses several commercial reverse and domain engineering toolkitsSlides for instructors are available onlineInformation is based on the IEEE SWEBOK (Software Engineering Body of Knowledge)

  3. Personnel Management theories and applications

    Institute of Scientific and Technical Information of China (English)

    Yanni Feng

    2010-01-01

    @@ 1.Introduction Many new businesses are opened in the whole world every day.Unfortunately,only a minor part of them has success and continues its activity.There is a variety of reasons which determine the hankruptcy of companies.Most of them are included in running a business,and more and more people come to realize the significance of management,especially personnel management,as personnel represents the relationship between people in the company,which is a key point for the development of enterprise.

  4. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E. [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1998-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  5. Turbine maintenance and modernization

    Energy Technology Data Exchange (ETDEWEB)

    Unga, E [Teollisuuden Voima Oy, Olkiluoto (Finland)

    1999-12-31

    The disturbance-free operation of the turbine plant plays an important role in reaching good production results. In the turbine maintenance of the Olkiluoto nuclear power plant the lifetime and efficiency of turbine components and the lifetime costs are taken into account in determining the turbine maintenance and modernization/improvement program. The turbine maintenance program and improvement/modernization measures taken in the plant units are described in this presentation. (orig.)

  6. Electric motor predictive and preventive maintenance guide

    International Nuclear Information System (INIS)

    Oliver, J.A.

    1992-07-01

    Electric motor performance is vital to the reliable and efficient operation of power plants. The failure of one or more critical motors could cause lost capacity and excessive repair and maintenance cost. However, existing maintenance recommendations proposed by vendors for electric motors have sometimes encouraged many overly conservative maintenance practices. These practices have lead to excessive maintenance activities and costs which have provided no extra margin of operability. EPRI has sponsored RP2814-35 to develop a guide which provides power plants with information and guidance for establishing an effective maintenance program which will aid in preventing unexpected motor failures and assist in planning motor maintenance efforts. The guide includes a technical description which summarizes technical data relative to the four basic types of motors and their components in general use in power plants. The significant causes of motor failures are investigated and described in detail and methods to optimize service life and minimize maintenance cost through appropriate preventive maintenance and conditioning program are presented. This guide provides a foundation for an effective electric motor maintenance program and simplifies the selection of predictive and preventive maintenance tasks. Its use will enable maintenance personnel in nuclear and fossil plants to plan motor repairs during scheduled outages and avoid costly unexpected failures

  7. INCREASED COMPETITIVENESS OF CONSTRUCTION ENTERPRISES ON THE BASIS OF ORGANISATIONAL-ECONOMIC DECISIONS OF PERSONNEL POTENTIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    J. R. Emirbekova

    2017-01-01

    Full Text Available Objectives. The development of an algorithm for optimising the formation and use of human resources of a construction enterprise.Methods. The research basis consists in a generalised methodology  for personnel management, as well as specific methods for logical  and statistical analysis of management decision-making in  construction activities. The approaches, criteria, indicators and methods for assessing the effectiveness of human resource  management are studied alongside factors influencing the efficiency  resource potential management in a construction enterprise.Results. A quantitative methodology for the selection of qualified  staff for the implementation of construction projects is proposed.  The indicators of the effectiveness of the staff potential are  determined. Qualitative and quantitative data for the optimal  personnel formation for the construction project realisation are  systematised. An algorithm for optimising the personnel potential of  a construction enterprise is proposed. The use of this algorithm will  inform the choice of organisational and economic solutions for the  formation and effective use of qualified personnel at the expense of  combining professions, thereby reducing the cost and duration of construction work and increasing the resource efficiency and competitiveness of the construction enterprise.Conclusion. The labour potential of a construction enterprise can  significantly contribute to increased efficiency if it is used  appropriately and in an organised manner, using modern scientific  methods of management. Methods for building and organising the  activity of the personnel management system are proposed and a  mechanism for establishing relationships between the employer and employees that promote the most effective use of all types of resources for the development of the enterprise according to  strategic objectives is disclosed. The dominant role of the

  8. Speech and language therapists' perspectives of therapeutic alliance construction and maintenance in aphasia rehabilitation post-stroke.

    Science.gov (United States)

    Lawton, Michelle; Sage, Karen; Haddock, Gillian; Conroy, Paul; Serrant, Laura

    2018-05-01

    Therapeutic alliance refers to the interactional and relational processes operating during therapeutic interventions. It has been shown to be a strong determinant of treatment efficacy in psychotherapy, and evidence is emerging from a range of healthcare and medical disciplines to suggest that the construct of therapeutic alliance may in fact be a variable component of treatment outcome, engagement and satisfaction. Although this construct appears to be highly relevant to aphasia rehabilitation, no research to date has attempted to explore this phenomenon and thus consider its potential utility as a mechanism for change. To explore speech and language therapists' perceptions and experiences of developing and maintaining therapeutic alliances in aphasia rehabilitation post-stroke. Twenty-two, in-depth, semi-structured interviews were conducted with speech and language therapists working with people with aphasia post-stroke. Qualitative data were analysed using inductive thematic analysis. Analysis resulted in the emergence of three overarching themes: laying the groundwork; augmenting cohesion; and contextual shapers. Recognizing personhood, developing shared expectations of therapy and establishing therapeutic ownership were central to laying the groundwork for therapeutic delivery. Augmenting cohesion was perceived to be dependent on the therapists' responsiveness and ability to resolve both conflict and resistance, as part of an ongoing active process. These processes were further moulded by contextual shapers such as the patient's family, relational continuity and organizational drivers. The findings suggest that therapists used multiple, complex, relational strategies to establish and manage alliances with people with aphasia, which were reliant on a fluid interplay of verbal and non-verbal skills. The data highlight the need for further training to support therapists to forge purposive alliances. Training should develop: therapeutic reflexivity; inclusivity in

  9. Nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1981-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  10. Formation and maintenance of the territorial balance in the conditions of high-rise construction in the city

    Science.gov (United States)

    Kisel, Tatiana

    2018-03-01

    High-rise construction results in the need of planning of infrastructure facilities, taking into account the increase in loading, as high-rise construction allows to place considerably bigger number of residents in the limited territory. For this purpose it is necessary to estimate the required and actual level of providing the population with each particular type of the facilities of social infrastructure. The compliance of required and actual level of providing can be characterized as the territorial balance, while the discrepancy acts as the territorial imbalance. The article is devoted to the development of such instruments of planning of urban development, which will allow to create the qualitative urban environment, founded on the territorial balances. Namely, it is devoted to the calculation of level of providing the population with the facilities of social infrastructure, to the determination of level of the imbalance in absolute and relative units and also to the ranging of imbalances on urgency of their elimination. The size of the imbalance is of great importance for planning and realization of managerial influences from the executive authorities, operating the city development. In order to determine the urgency of realization of actions for the construction of facilities of social infrastructure it is offered to range the imbalances according to their size, having determined the deviation size from balance, which is so insignificant that it does not demand any managerial influences (it can be characterized as balance) and also the groups of the imbalances, differing in urgency of managerial influences, directed to the decrease and elimination of the revealed imbalance.

  11. Role and responsibilities of management in NPP personnel training and competence. Working material

    International Nuclear Information System (INIS)

    1994-01-01

    The main aim and result of this seminar was imparting knowledge to various levels of Paks NPP management on their special tasks and responsibilities to achieve personnel competence, which include: meeting relevant regulatory and other requirements; defining the qualifications for NPP personnel jobs; training using systematic approach to training to attain the required level of qualification and competence of all NPP personnel, which includes management, operations, maintenance and technical support personnel and others; recruiting and retaining qualified personnel, including career development; supporting the training of all personnel on their responsibilities for introducing, maintaining and improving safety. Refs, figs and tabs

  12. Carbon footprint of construction, operation and maintenance of waterways and traffic; Merenkulun ja liikenteen hiilijalanjaelki. Osa 1: Merenkulun hiilijalanjaelki, Osa 2: Tie-, rata- ja meriliikenteen hiilijalanjaeljet

    Energy Technology Data Exchange (ETDEWEB)

    Illman, J.; Kumpulainen, A.; Pesola, A.; Vanhanen, J.

    2012-07-01

    In 2010, the Finnish Transport Agency launched a project to study the carbon footprint of the construction, use and maintenance of Finland's transport network infrastructure. This report presents the results of the second phase, where the carbon footprint was calculated for the coastal ports and fairways used for merchant shipping (part 1 of this report). In addition, the carbon footprint of traffic operating on the road and rail networks and on the coastal fairways was calculated (part 2 of this report). The carbon footprints of four Finnish coastal merchant shipping ports and the fairways leading into them were calculated during a 100-year period. Based on these four cases and statistics the rest of the coastal ports were categorised into four groups: passenger ports, unitized cargo ports, bulk ports and liquid bulk ports. Based on this categorisation the carbon footprint for the infrastructure of coastal merchant shipping was estimated. A carbon footprint tool was developed to enable the modelling of the impacts of different port and fairway planning parameters on the life-cycle emissions. The main source of emissions in the selected cases was the energy used during the use phase: the fuel used by the machinery or the electricity consumed during the operation of the port. In the construction of the examined ports and fairways, the materials used, their transportation and installation do not have a significant impact on the life-cycle emissions. The carbon footprint of Finland's coastal merchant shipping ports and fairways (35 ports and 3 230 km of fairways) during the 100-year period was estimated at 150 000 tCO{sub 2}/a. The emissions of ports vary between 1 900-15 000 tCO{sub 2}/a. The largest sources of emissions do not always originate from the use phase as in the selected cases. The emissions of construction and maintenance can be larger than of the use phase in ports that occupy a large area of land in relation to the amount of traffic flowing

  13. Opportune maintenance and predictive maintenance decision support

    OpenAIRE

    Thomas , Edouard; Levrat , Eric; Iung , Benoît; Cocheteux , Pierre

    2009-01-01

    International audience; Conventional maintenance strategies on a single component are being phased out in favour of more predictive maintenance actions. These new kinds of actions are performed in order to control the global performances of the whole industrial system. They are anticipative in nature, which allows a maintenance expert to consider non-already-planned maintenance actions. Two questions naturally emerge: when to perform a predictive maintenance action; how a maintenance expert c...

  14. The Clinical Obesity Maintenance Model: An Integration of Psychological Constructs including Mood, Emotional Regulation, Disordered Overeating, Habitual Cluster Behaviours, Health Literacy and Cognitive Function

    OpenAIRE

    Raman, Jayanthi; Smith, Evelyn; Hay, Phillipa

    2013-01-01

    Psychological distress and deficits in executive functioning are likely to be important barriers to effective weight loss maintenance. The purpose of this paper is twofold. First, in the light of recent evidence in the fields of neuropsychology and obesity, particularly on the deficits in the executive function in overweight and obese individuals, a conceptual and theoretical framework of obesity maintenance is introduced by way of a clinical obesity maintenance model (COMM). It is argued tha...

  15. Maintenance program, organization and procedures

    International Nuclear Information System (INIS)

    Schegk, J.R.R.

    1986-01-01

    The Rheinisch-Westfaelisches Elektrizitaetswerk AG (RWE) operates two pressurized water reactors (PWR) with 1.200 MW and 1.300 MW and two boiling water reactors (BWR) with an electrical output of 1.300 MW each. The PWR were commissioned in 1975 and 1977 respectively and have so far achieved a cumulative availability of 72%. The BWR started operating in 1984 and 1985. Since than they have been generating with a cumulative availability of 88%. The reliability of the nuclear power stations resulted in a trouble-free operation. For the last two years, the unscheduled non-availability amounted to 3,7% and 6,5% for the PWR and the BWR respectively. These favourable operating results derive inter alia from systematic preventive maintenance and consistent outage management. Apart from the personnel structure in the power stations the functional sequence of planning, control, performance as well as evaluation of maintenance results constitute a closed cycle. In order to ensure and support an effective cooperation of the above mentioned four functional sequences of a cycle, uniform and computer-assisted information and planning aids have been introduced such as task lists, job ordering, time scheduling and materials management. As a result of this preventive maintenance system the average refueling outage period is 35 to 42 days. (orig.)

  16. Mechanical configuration and maintenance

    International Nuclear Information System (INIS)

    Brown, T.G.; Casini, G.; Churakov, G.F.

    1982-01-01

    The INTOR engineering design has been strongly influenced by considerations for assembly and maintenance. A maintenance philosophy was established at the outset of the conceptual design to insure that the tokamak configuration would be developed to accommodate maintenance requirements. The main features of the INTOR design are summarized in this paper with primary emphasis on the impact of maintenance considerations. The most apparent configuration design feature is the access provided for torus maintenance. Particular attention was given to the size and location of superconducting magnets and the location of vacuum boundaries. All of the poloidal field (PF) coils are placed outside of the bore of the toroidal field (TF) coils and located above and below an access opening between adjacent TF coils through which torus sectors are removed. A magnet structural configuration consisting of mechanically attached reinforcing members has been designed which facilitates the open access space for torus sector removal. For impurity control, a single null poloidal divertor was selected over a double null design in order to maintain sufficient access for pumping and maintenance of the collector. A double null divertor was found to severely limit access to the torus with the addition of divertor collectors and pumping at the top. For this reason, a single null concept was selected in spite of the more difficult design problems associated with the required asymmetric PF system and higher particle loadings

  17. Maintenance Effectiveness and Target Observation System and its ERP Interface

    International Nuclear Information System (INIS)

    Soon, Han Seong; Kim, Gi Yong; Seo, Mi Ro; Jeong, Hun Jong; Choi, Kwang Hee; Hong, Sung Yull

    2005-01-01

    Maintenance effectiveness and target observation system (MENTOS) is a maintenance rule (MR) implementation software for plant personnel to collect, edit, store, and analyze all information required for the MR implementation. Potential users and the developers of MENTOS have decided that MENTOS is implemented in the ERP system of KHNP. This article describes MENTOS briefly and introduces the ERP interface of MENTOS

  18. Operation and maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Ackermann, G.

    1987-01-01

    This textbook gives a systematic introduction into the operational and maintenance activities in nuclear power plants with pressurized water reactors. Subjects: (1) Setup and operational behaviour of power reactors, (2) setup of nuclear power plants, (3) radiation protection and nuclear safety, (4) nuclear fuel, (5) constructional layout of nuclear power plants, (6) management, and (7) maintenance. 158 figs., 56 tabs

  19. Susquehanna SES maintenance supervisor training and certification

    International Nuclear Information System (INIS)

    Deckman, M.

    1991-01-01

    Susquehanna's program targets all Supervisors, Supervisor Candidates, and Temporary Supervisors that are responsible for in-plant maintenance or maintenance support activities, including: mechanical maintenance; electrical maintenance; maintenance support (labor support, radwaste, etc.); mobile construction support (mechanical and electrical); chemistry; health physics; maintenance planning; and instrument and controls. The program integrates the three major areas of direct Supervisory responsibilities: (1) Leadership and Management - Skills that require interpersonal activities that are typically humanistic and subjective; such as coaching, motivating, communications, etc. (2) Technical and Administrative - Knowledge that is directly related to the job of Supervising from the production, regulatory, accountability perspective. These topics are very objective and include training on topics such as workpackages, plant chemistry parameters, radiological concerns, etc. (3) Technical Skills - Ensure each Supervisor is technically competent in the plant systems, components, or equipment he/she is tasked with maintaining or overseeing. Typical skills found in this area are, circuit breaker maintenance, primary system sampling, or overhauling pumps

  20. Calibration of instrument and personnel monitoring in radiological protection

    International Nuclear Information System (INIS)

    Abdul Aziz Mohamad Ramli; Wan Saffiey Wan Abdullah

    1987-01-01

    It is difficult to choose radioprotection equipments that are not too expensive and suit the purpose. Some of the dosimetric characteristics of good dosemeters outlined by ISO 4071-1978 (E) namely scale linearity, energy dependence, radiation quality dependence and angular dependence for some of the commercially available dosemeters are discussed. The calibration procedures practised at the National Secondary Standard Dosimetry Laboratory (SSDL), of the Nuclear Energy Unit (NEU) is also explained. The radiological equipments for personnel monitoring such as film badge and TLD are widely used to estimate the radiation dose delivered to the whole or partial body of a personnel. Both of the personnel monitoring procedures have been established at the NEU. The objective, use and maintenance of the devices are also discussed in detail. The evaluation of the monthly dose received by a personnel from various establishments in the country are also presented. (author). 17 figs

  1. Individual protection of NPP personnel

    International Nuclear Information System (INIS)

    Koshcheev, V.S.; Gol'dshtejn, D.S.; Chetverikova, Z.S.

    1983-01-01

    Specific features of NPP personnel individual protection are considered, mainly with respect to maintenance and repair works on various type reactors. The major concern is given to the selection and application reglamentations of the individual protection system (IPS), employment of sanitary locks, the organization of individual protection under the conditions of a heating microclimate. The ways are specified to the development and introduction of the most effective IPS and improvement of the entire NPP personnel individual protection system with respect to providing the necessary protection effect for maintaining high working capability of the personnel and minimizing the IPS impact on human organism functional systems. The accumulated experience in the personnel individual protection can be applied during construction and operation of NPP's in CMEA member-countries [ru

  2. Are air-conditioning maintenance personnel at increased risk of Legionellosis?

    Science.gov (United States)

    Goldman, W D; Marr, J S

    1980-07-01

    We surveyed by use of medical questionnaires and blood tests 21 maintenance workers involved with cleaning and servicing cooling towers and evaporative condensers at a large company to determine the frequency of pneumonia and antibody levels against Legionella pneumophila serogroup 1. The 21 high-risk workers were compared with 27 low-risk workers, persons who were not directly involved in service or maintenance for the company. The overall prevalence of titers greater than or equal to 128 for the 21 high-risk workers was 19.0% compared with 22.2% for the low-risk group. There were no significant differences in the history of pneumonia between these groups. Possible explanations for these findings are discussed.

  3. The application of utility analysis processes to estimate the impact of training for nuclear maintenance personnel

    International Nuclear Information System (INIS)

    Groppel, C.F.

    1991-01-01

    The primary objectives of this study were to test two utility analysis models, the Cascio-Ramos Estimate of Performance in Dollars (CREPID) model and Godkewitsch financial utility analysis model and to determine their appropriateness as tools for evaluating training. This study was conducted in conjunction with Philadelphia Electric Company's Nuclear Training Group. Job performance of nuclear maintenance workers was assessed to document the impact of the training program. Assessment of job performance covered six job performance themes. Additionally, front-line nuclear maintenance supervisors were interviewed to determine their perceptions of the nuclear maintenance training. A comparison of supervisor's perceptions and outcomes of the utility analysis models was made to determine the appropriateness of utility analysis as quantitative tools for evaluating the nuclear maintenance training program. Application of the CREPID utility analysis model indicated the dollar value of the benefits of training through utility analysis was $5,843,750 which represented only four of the job performance themes. Application of the Godkewitsch utility analysis model indicated the dollar value of the benefits of training was $3,083,845 which represented all six performance themes. A comparison of the outcomes indicated a sizeable difference between the dollar values produced by the models. Supervisors indicated training resulted in improved productivity, i.e., improved efficiency and effectiveness. Additionally, supervisors believed training was valuable because it provided nonmonetary benefits, e.g., improved self-esteem and confidence. The application of utility analysis addressed only monetary benefits of training. The variation evidenced by the difference in the outcome of the two models suggests that utility analysis open-quotes estimatesclose quotes may not accurately reflect the impact of training

  4. Building Maintenance, Management, and Budgeting.

    Science.gov (United States)

    Pawsey, M. R.

    1982-01-01

    Australian methods and formulas for funding building maintenance and management are outlined and found to be haphazard. Discussed are: ultimate costs of deferred maintenance, major plant replacements, life cycle costing, types of maintenance programs (including full preventive maintenance), use of computer programs for planning, and organization…

  5. Construction of maintenance management system of atomic power plant

    International Nuclear Information System (INIS)

    Shibasaki, Naofumi; Ookawara, Koumei; Suzuki, Masashi

    2005-01-01

    This maintenance management system has the retrieval function of the variation conditions with the three dimensions models and repair history. The structure of system consists of the management data retrieval tool and the total facilities repair plan support tool. The system has the management function of facilities information, a bird's-eye view of three dimensions models, data recording function, output of various kinds of registers, pre-estimation of degradation and the repair plan support function. When the total facilities repair plan support tool is selected, the variation conditions of facilities, repair history and repair cost are shown, and each part of facility and materials is able to display. (S.Y.)

  6. 14 CFR 171.273 - Maintenance and operations requirements.

    Science.gov (United States)

    2010-01-01

    ... authorized persons. (3) FCC licensing requirements for operations and maintenance personnel. (4) Posting of..., with a maximum corrective maintenance time of not greater than 1.5 hours. This measure applies to... than 1,500 hours. This measure applies to unscheduled outages, out-of-tolerance conditions, and...

  7. Operations and maintenance philosophy

    International Nuclear Information System (INIS)

    DUNCAN, G.P.

    1999-01-01

    This Operations and Maintenance (O and M) Philosophy document is intended to establish a future O and M vision, with an increased focus on minimizing worker exposure, ensuring uninterrupted retrieval operations, and minimizing operation life-cycle cost. It is intended that this document would incorporate O and M lessons learned into on-going and future project upgrades

  8. Floors: Care and Maintenance.

    Science.gov (United States)

    Post Office Dept., Washington, DC.

    Guidelines, methods and policies regarding the care and maintenance of post office building floors are overviewed in this handbook. Procedures outlined are concerned with maintaining a required level of appearance without wasting manpower. Flooring types and characteristics and the particular cleaning requirements of each type are given along with…

  9. Floors: Selection and Maintenance.

    Science.gov (United States)

    Berkeley, Bernard

    Flooring for institutional, commercial, and industrial use is described with regard to its selection, care, and maintenance. The following flooring and subflooring material categories are discussed--(1) resilient floor coverings, (2) carpeting, (3) masonry floors, (4) wood floors, and (5) "formed-in-place floors". The properties, problems,…

  10. RA reactor operation and maintenance in 1992, Part 1

    International Nuclear Information System (INIS)

    Sotic, O.; Cupac, S.; Sulem, B.; Zivotic, Z.; Majstorovic, D.; Tanaskovic, M.

    1992-01-01

    During 1992 Ra reactor was not in operation. All the activities were fulfilled according to the previously adopted plan. Basic activities were concerned with revitalisation of the RA reactor and maintenance of reactor components. All the reactor personnel was busy with reconstruction and renewal of the existing reactor systems and building of the new systems, maintenance of the reactor devices. Part of the staff was trained for relevant tasks and maintenance of reactor systems [sr

  11. Maintenance and regulations

    International Nuclear Information System (INIS)

    Noel, R.

    1984-01-01

    Description of the main regulations concerning the processes tied with maintenance and in service supervision of the pressure vessels in classical or nuclear power plants or of their accessories (essentially in order to fix the time-table of the hydraulic test procedures and the inspection chronology [fr

  12. Maintenance: problem and solution

    CERN Multimedia

    CERN Bulletin

    2012-01-01

    Equipment that is often unique, machines that are as old as the Laboratory, continuous and demanding performance requirements: these are the challenges faced by CERN’s accelerator maintenance teams. There are some twenty such teams, attached to different departments. A new project aims to standardise their procedures to make their work easier, and you can be a part of it.   “For the past year or so, the Accelerator and Technologies Sector and the GS Department have been working together on identifying the needs of the different teams that perform maintenance on CERN’s equipment. We are now ready to provide computer support with detailed specifics about the processes that need to be set up,” explains Goran Perinić, one of the leaders in CERN’s new Maintenance Management project (MMP). Since the LHC entered operation, the responsibilities of the technical teams have been broadened to cover maintenance of the collider and that of its injectors...

  13. Maintenance and hazardous substances

    NARCIS (Netherlands)

    Kuhl, K.; Terwoert, J.; Cabecas, J.J.M.

    2012-01-01

    Maintenance workers come into close contact with a broad variety of often hazardous chemicals. Depending on the specific type, these chemicals may not only cause diseases like skin sores or cancer, but many of them are highly flammable and explosive. This e-facts focuses on the specific risks

  14. Principles of MONJU maintenance. Characteristic of MONJU maintenance and reflection of LWR maintenance experience to FBR

    International Nuclear Information System (INIS)

    Nakai, Satoru; Nishio, Ryuichi; Uchihashi, Masaya; Kaneko, Yoshihisa; Yamashita, Hironobu; Yamaguchi, Atsunori; Aoki, Takayuki

    2014-01-01

    A sodium cooled fast breeder reactor (FBR) has unique systems and components and different degradation mechanism from light water reactor (LWR) so that need to establish maintenance technology in accordance with its features. The examination of the FBR maintenance technology is carried out in the special committee for considering the maintenance for Monju established in the Japan Society of Maintenology (JSM). As a result of the study such as extraction of Monju maintenance feature, maintenance technology benchmark between Monju and LWR components and survey of LWR maintenance experience, it is clear that principles of maintenance are same as LWR, necessity of LWR maintenance experience reflection and points to be considered in Monju maintenance. The road map to establish a FBR maintenance technology in the technical aspect became clear and it is vital to acquire operation and maintenance experience of the plant to implement this road map, and to establish a fast reactor maintenance. (author)

  15. Maintenance and environmental qualification

    International Nuclear Information System (INIS)

    Martin, R.S.; Austin, D.G.

    1995-01-01

    The design of today's nuclear generating plants involves many detailed design considerations. This includes comprehensive look at aging effects on plant components over their expected lifetimes. This is important to ensuring that the plant operates safely throughout its life. The effects of aging are required to be documented in detail in today's designs. This documentation provides assurance that safe operating conditions are maintained throughout the station life cycle. This requirement is analogous to the longer standing requirement to ensure pressure boundary integrity. The pressure boundary integrity requirement has existed in the industry since its inception. The subject of plant aging effects and the maintenance of functionality is known as Environmental Qualification (EQ). This paper will attempt to explain the wisdom of EQ and the potential for optimizing maintenance activities (to move from reactive to proactive activities), within the context of the overall maintenance program. It is the author's intent to encourage the active involvement of maintenance professionals in the effective implementation of the ongoing EQ program so that the benefits are maximized

  16. The utilization of performance evaluation instruments by technical trainers to evaluate maintenance personnel in the nuclear power industry in the United States

    International Nuclear Information System (INIS)

    Hornberger, C.K.

    1993-01-01

    The purpose of this study was to document the utilization of performance evaluation instruments by technical trainers in the evaluation of maintenance personnel in US nuclear power plants. Performance evaluation of maintenance personnel has been identified by nuclear utilities and the Nuclear Regulatory Commission as the only acceptable method of determining worker competence. The NRC requires performance evaluation to be conducted to performance standards, but it does not specify the standards or the method to be utilized. Each plant is free to establish its own standards and methods of evaluation. This was a descriptive study utilizing descriptive statistics for the analysis of the data. The subjects included 655 maintenance trainers in 72 US nuclear plants. Conclusions of the study include: (1) Technical trainers are in compliance with NRC regulations. (2) Evaluation materials developed by the Institute of Nuclear Power Operations are used by technical trainers in every one of the 62 plants that responded. (3) In-plant or self-developed Performance Evaluation Instruments are utilized by 419 or 95.2% of the technical trainers. (4) Technical trainers incorporate nine common components into their Performance Evaluation Instruments. (5) Technical trainers evaluate maintenance processes and the product produced by workers when following procedures and specifications are critical and when safety hazards are involved. (6) Technical trainers believe that utilizing Performance Evaluation Instruments makes their job easier by providing documentation about the quality and standards of maintenance skills. (7) Technical trainers believe that maintenance workers benefit when their skills are assessed through the use of Performance Evaluation Instruments

  17. Identifying Best Practices in Pavement Design, Materials, Construction, and Maintenance in Wet-Freeze Climates Similar to Michigan

    Science.gov (United States)

    2018-02-28

    The intent of this research is to identify best practices for pavements in wet-freeze climates. For the purposes of this report, a best practice is a procedure that has been shown by research or experience to produce improved results and that is esta...

  18. Final Environmental Assessment Addressing Construction, Operation, and Maintenance of a Hot Cargo Pad at Kirtland Air Force Base, New Mexico

    Science.gov (United States)

    2011-01-01

    brachyrhynchos), northern mockingbird (Mimus polyglottos), curved-billed thrasher (Toxostoma curvirostre), lark sparrow (Chordestes grammacus), black...cloud ceiling, fog, rain, or poor visibility, lighted structures might not be visible to migrating birds and can cause bird kills because Final EA...regulations, the MBTA makes it unlawful to pursue, hunt, take, capture, or kill ; attempt to take, capture or kill ; possess, offer to or sell, barter, purchase

  19. Nuclear instrument maintenance - problems, solutions, and obstacles

    International Nuclear Information System (INIS)

    Vuister, P.H.

    1983-01-01

    In 200 laboratories of South-East Asia, Latin America and Africa a survey was made of the state of instrumentation for nuclear medicine. The principal cause of failures and defects was inadequate quality control and preventive maintenance. On the basis of the survey coordinated research programs were compiled for the maintenance of nuclear instruments. The four principal points of the programs are: to safeguard quality and stable electric power supplies for the instruments, to safeguard permanent temperature and humidity in the environment in which the equipment is operated, effective maintenance, and training of personnel. In the years 1981 and 1982, 14 local training courses were run in which emphasis was put on practicals and tests in mechanics and electronics

  20. The clinical obesity maintenance model: an integration of psychological constructs including mood, emotional regulation, disordered overeating, habitual cluster behaviours, health literacy and cognitive function.

    Science.gov (United States)

    Raman, Jayanthi; Smith, Evelyn; Hay, Phillipa

    2013-01-01

    Psychological distress and deficits in executive functioning are likely to be important barriers to effective weight loss maintenance. The purpose of this paper is twofold. First, in the light of recent evidence in the fields of neuropsychology and obesity, particularly on the deficits in the executive function in overweight and obese individuals, a conceptual and theoretical framework of obesity maintenance is introduced by way of a clinical obesity maintenance model (COMM). It is argued that psychological variables, that of habitual cluster Behaviors, emotional dysregulation, mood, and health literacy, interact with executive functioning and impact on the overeating/binge eating behaviors of obese individuals. Second, cognizant of this model, it is argued that the focus of obesity management should be extended to include a broader range of maintaining mechanisms, including but not limited to cognitive deficits. Finally, a discussion on potential future directions in research and practice using the COMM is provided.

  1. The Clinical Obesity Maintenance Model: An Integration of Psychological Constructs including Mood, Emotional Regulation, Disordered Overeating, Habitual Cluster Behaviours, Health Literacy and Cognitive Function

    Directory of Open Access Journals (Sweden)

    Jayanthi Raman

    2013-01-01

    Full Text Available Psychological distress and deficits in executive functioning are likely to be important barriers to effective weight loss maintenance. The purpose of this paper is twofold. First, in the light of recent evidence in the fields of neuropsychology and obesity, particularly on the deficits in the executive function in overweight and obese individuals, a conceptual and theoretical framework of obesity maintenance is introduced by way of a clinical obesity maintenance model (COMM. It is argued that psychological variables, that of habitual cluster Behaviors, emotional dysregulation, mood, and health literacy, interact with executive functioning and impact on the overeating/binge eating behaviors of obese individuals. Second, cognizant of this model, it is argued that the focus of obesity management should be extended to include a broader range of maintaining mechanisms, including but not limited to cognitive deficits. Finally, a discussion on potential future directions in research and practice using the COMM is provided.

  2. Job analysis of the electrician position for the nuclear power plant maintenance personnel reliability model

    International Nuclear Information System (INIS)

    Federman, P.J.; Bartter, W.D.; Siegel, A.I.

    1984-02-01

    This report presents the methods, procedures, and results of the fourth and final of a series of job analytic studies which characterize maintenance positions in nuclear power plants. The electrician position is the subject of the present report. The characterization of the electrician position takes the form of detailed information about: (1) the frequency of performing various tasks, (2) the time required for performing each task, (3) the training required for adequate performance of each task, and (4) the perceived consequences resulting from inadequate task performance. Additionally, information is presented about the intellective and the perceptual-motor loading imposed by each task. This information contributes to job design and training requirements derivation as well as to the assessment of human performance reliability in nuclear power plants

  3. Building relationships for better maintenance.

    Science.gov (United States)

    Lee, Hackman Hon Yin; Scott, David

    2009-02-01

    Effective management of building maintenance is a vital ingredient in ensuring a high quality built environment for any building's occupiers. However, maintenance is not high on the list of priorities for most organisations. Communication between top management personnel looking at maintenance issues from a strategic standpoint and maintenance staff considering them at an operational level is often not as good as it should be. When planning maintenance activities maintenance personnel often draw too heavily on their technical experience and expertise without taking sufficient account of wider organisational objectives or consulting effectively with top management. Senior managers also regularly complain about lack of managerial input from maintenance departments. Such barriers contribute to communication difficulties between top management at a strategic level and maintenance personnel at an operational level. Identifying where the key differences lie in senior managers' and maintenance personnel's viewpoints on maintenance strategy can prove invaluable in achieving some convergence of opinions and optimising the efficiency of the overall building maintenance process.

  4. STARFIRE remote maintenance and reactor facility concept

    International Nuclear Information System (INIS)

    Graumann, D.W.; Field, R.E.; Lutz, G.R.; Trachsel, C.A.

    1981-01-01

    A total remote maintenance facility has been designed for all equipment located within the reactor building and hot cell, although operational flexibility has been provided by design of the reactor shielding such that personnel access into the reactor building within 24 hours after reactor shutdown is possible. The reactor design permits removal and replacement of all components if necessary, however, the vacuum pumps, isolation valves and blanket require scheduled, routine maintenance. Reactor scheduled maintenance does not dominate annual plant downtime, therefore, several scheduled operations can be added without affecting reactor availability. The maintenance facilities consist of the reactor building, the hot cell, the reactor service area and the remote maintenance control room. The reactor building contains the reactor, selected support system modules, and required maintenance equipment. The reactor and the support systems are maintained with (1) equipment that is mounted on a monorail system; (2) overhead cranes; and (3) bridge-mounted electromechanical manipulators. The hot cell is located outside of the reactor building to localize contamination products and permit independent operation. An equipment air lock connects the reactor building to the hot cell

  5. Return to work: Police personnel and PTSD

    NARCIS (Netherlands)

    Plat, Marie-Christine J.; Westerveld, Gre J.; Hutter, Renée C.; Olff, Miranda; Frings-Dresen, Monique H. W.; Sluiter, Judith K.

    2013-01-01

    This study i) describes the number of police personnel with PTSD who are working and those who are on sick leave before and after an out-patient-clinic treatment program and ii) examines which factors are related to return to work. Police personnel treated for PTSD (n=121). In this retrospective

  6. A review on sustainable construction management strategies for monitoring, diagnosing, and retrofitting the building’s dynamic energy performance: Focused on the operation and maintenance phase

    International Nuclear Information System (INIS)

    Hong, Taehoon; Koo, Choongwan; Kim, Jimin; Lee, Minhyun; Jeong, Kwangbok

    2015-01-01

    Highlights: • This study reviews the state-of-the-art in “energy” as well as “building”. • Building’s dynamic energy performance should be managed in the built environments. • This study summarizes recent progress in the building’s dynamic energy performance. • The major phases can be categorized into monitoring, diagnosing, and retrofitting. • This study proposes the specific future development directions and challenges by phase. - Abstract: According to a press release, the building sector accounts for about 40% of the global primary energy consumption. Energy savings can be achieved in the building sector by improving the building’s dynamic energy performance in terms of sustainable construction management in the urban-based built environments (referred to as an “Urban Organism”). This study implements the concept of “dynamic approach” to reflect the unexpected changes in the climate and energy environments as well as in the energy policies and technologies. Research in this area is very significant for the future of the building, energy, and environmental industries around the world. However, there is a lack of studies from the perspective of the dynamic approach and the system integration, and thus, this study is designed to fill the research gap. This study highlights the state-of-the-art in the major phases for a building’s dynamic energy performance (i.e., monitoring, diagnosing, and retrofitting phases), focusing on the operation and maintenance phase. This study covers a wide range of research works and provides various illustrative examples of the monitoring, diagnosing, and retrofitting of a building’s dynamic energy performance. Finally, this study proposes the specific future developments and challenges by phase and suggests the future direction of system integration for the development of a carbon-integrated management system as a large complex system. It is expected that researchers and practitioners can

  7. Winter maintenance performance measure.

    Science.gov (United States)

    2016-01-01

    The Winter Performance Index is a method of quantifying winter storm events and the DOTs response to them. : It is a valuable tool for evaluating the States maintenance practices, performing post-storm analysis, training : maintenance personnel...

  8. The relationship between the JobMatchTalent test and the NEO PI-R: construct validation of an instrument designed for recruitment of personnel.

    Directory of Open Access Journals (Sweden)

    Danilo Garcia

    Full Text Available BACKGROUND: Personality measures in recruitment situations need to (1 cover the Big-Five model of personality and (2 focus on interpersonal requirements of jobs. We investigated the relationship between the JobMatchTalent test and the NEO Personality Inventory-Revised (NEO PI-R. The JobMatchTalent consists of three areas (i.e., Stability Patterns, Action Patterns, and Relation Patterns divided in 10 main scales providing a deeper picture of the employee (e.g., Work Structure, Tolerance. METHOD: The participants (N = 390 were recruited from the professional network LinkedIn and completed online versions of both instruments. We used correlation analysis to investigate the construct validity of the JobMatchTalent test by identifying significant correlation coefficients no lower than ±.30 (i.e., convergent validity and those with nonsignificant correlations (i.e., discriminant validity. Regression analyses were used to investigate the variance of the NEO PI-R dimensions that was explained by the JobMatchTalent test. RESULTS: Four of the NEO PI-R dimensions showed considerable overlap with the following JobMatchTalent main scales: (1 Work structure and Decision Characteristics, which both are measures of thoughtfulness, planning, and order (i.e., Conscientiousness; (2 Inner drive, Activity, Drive, Acting, and Communication, which represent different aspects of being outgoing and extrovert (i.e., Extraversion; (3 Tolerance and Social interest, which measure a person's interest and ability to create social relations (i.e., Agreeableness; and (4 Stress Index, a measure of emotional stability (i.e., the opposite of Neuroticism. All 5 NEO PI-R dimensions overlapped with the JobMatchTalent sub-scales. CONCLUSIONS: The study suggests that 4 of the NEO PI-R dimensions are logically categorized along the JobMatchTalent main scales: (1 Order and Thoughtfulness, (2 Energy and Extraversion, (3 Social Adaptation and Interest, and (4 Emotion Control. Hence

  9. Managing and controlling maintenance

    International Nuclear Information System (INIS)

    Chavez, G.; Perla, H.F.

    1980-01-01

    A well-planned maintenance-management program can bring organized yet flexible scheduling, improved productivity, and a ready-access data bank. The system detailed in the article, developed for a nuclear power plant, has application to any equipment-intensive facility. Key features of the system include: documentation of all work requirements and their completion; automated prioritizing of work orders; automatic generation of work orders for repetitive work, when due; work lists in priority sequence; deferred, standby, and outage work reports; labor and work-order backlog information; equipment work histories and cumulative failure data

  10. Field installation and maintenance

    International Nuclear Information System (INIS)

    Prebble, R.E.

    1981-01-01

    The use of a neutron moisture meter for the determination of the water content of soil necessitates the installation of an access tube down which the probe can be lowered. Errors in neutron count rate will be introduced if water enters the air gap between a loose fitting tube and the soil. Errors may also be caused by changes in the soil structure resulting from the techniques for soil removal and from driving the access hole. Access tube materials and dimensions, methods of installation and maintenance of the site are discussed

  11. Different Transportation and Maintenance Strategies for Offshore Wind Farms

    DEFF Research Database (Denmark)

    Ambühl, Simon; Sørensen, John Dalsgaard

    as different maintenance strategies are considered. The report contains a case study where the presented approach is applied to a wind turbine farm and a sensitivity study of the different parameters like the operational range of the boat/helicopter, the electricity price, real rate of interest, inspection......Inspections as well as transportation of personnel and repair parts are a significant contributor to the levelized cost of energy for offshore wind turbines. There are different operation and maintenance (O&M) strategies for offshore wind turbines. Maintenance can be performed preventively...... of energy using different maintenance and transportation strategies....

  12. Constructing Memory: Competence Maintenance, Education and Training Working Group on the Implementation of Geological Disposal of the Radioactive Waste Technology Platform

    International Nuclear Information System (INIS)

    Palmu, Marjatta

    2015-01-01

    The Implementing Geological Disposal of Radioactive Waste Technology Platform (IGD-TP) community, with over 115 participants in 2014, according to its Vision 2025 (IGD-TP, 2009) aims to proceed to obtaining licences to construct and to safely operate deep geological repositories for spent fuel, high-level waste, and other long-lived radioactive waste in their respective countries. The commitment to Vision 2025 includes developing joint means to facilitate access to expertise and technology, and maintain competencies in the field of geological disposal in Europe. In 2012, IGD-TP launched a Working Group on Competence Maintenance, Education and Training (CMET), as one of its permanent joint activities for addressing its commitment to maintain competencies. In 2013, this permanent organisational working group convened for its first meeting and started working with the support of the IGD-TP Secretariat. The work on competence maintenance within this IGD-TP's working group is first of all focusing on benefiting from and promoting the ECVET approach's application in geological disposal and in future competence building of the community. ECVET approach identifies the LOs that need to be mastered by professionals to carry out their work - starting from the early stages of a waste management programme to running the nuclear waste facilities safely and efficiently. LOs are defined in terms of knowledge, skills and competence (KSC) in ECVET ('attitude' is the corresponding term used by the International Atomic Energy Agency). In their different job functions or tasks the professionals carrying out their work need to master these KSCs at specified European Qualification Framework qualification levels (European Qualification Framework or International Standard Classification for Education according to the job's requirements. The ECVET approach is useful for higher education and continuous professional development, too, not just for vocational education

  13. Interval of Routine Maintenance and Maintenance Performance: A Literature Review

    Directory of Open Access Journals (Sweden)

    Au-Yong Cheong Peng

    2016-01-01

    Full Text Available In high-rise residential buildings, the quality of facilities management services is significant to the normal operation of the facilities. Unfortunately, lack of concern towards building maintenance, especially preventive maintenance, happens in domestic housing industry in Malaysia. Majority of the maintenance operations of condominiums suffer from lack of planning, lack of proactive maintenance plan, and lack of proper implementation. Thus, this paper reviews the implementation of preventive maintenance strategy, routine maintenance in specific. An extensive review of literature published in 1987 to 2014 is performed for the purpose of this research. The publications are sourced from journal articles, conference proceedings and books. The literature analysis confirms that the routine maintenance of facilities and building services is vital and it can be influential towards the maintenance performance. Subsequently, a theoretical framework is developed, which shows the relationship between routine maintenance of building facilities & services and maintenance performance. The building facilities & services are divided into two categories. They are essential facilities & services that ensure the safety, health, habitability, and operability of buildings; while value-added facilities & services deal with property value, return on investment, and quality living of buildings. Based on the findings, a future research is proposed, which aims to identify the appropriate routine of maintenance for the facilities and services in high-rise residential buildings to improve the maintenance performance.

  14. ITER assembly and maintenance

    International Nuclear Information System (INIS)

    Honda, T.; Davis, F.; Lousteau, D.

    1991-01-01

    This document is intended to describe the work conducted by the ITER Assembly and Maintenance (A and M) Design Unit and the supporting home teams during the ITER Conceptual Design Activities, carried out from 1988 through 1990. Its content consists of two main sections, i.e., Chapter III, which describes the identified tasks to be performed by the A and M system and a general description of the required equipment; and Chapter IV, which provides a more detailed description of the equipment proposed to perform the assigned tasks. A two-stage R and D program is now planned, i.e., (1) a prototype equipment functional tests using full scale mock-ups and (2) a full scale integration demonstration test facility with real components (vacuum vessel with ports, blanket modules, divertor modules, armor tiles, etc.). Crucial in-vessel and ex-vessel operations and the associated remote handling equipment, including handling of divertor plates and blanket modules will be demonstrated in the first phase, whereby the database needed to proceed with the engineering phase will be acquired. The second phase will demonstrate the ability of the overall system to execute the required maintenance procedures and evaluate the performance of the prototype equipment

  15. Maintenance and management system

    International Nuclear Information System (INIS)

    Ando, Yasumasa.

    1992-01-01

    Since highly reliable operation is required in a nuclear power plant, monitoring during operation and periodical inspection are conducted carefully. The present invention provides maintenance and management systems for providing an aid so that these systems are combined effectively and operated rationally based on unified information management. That is, the system contains data bases comprising information for the design of the equipments and pipelines of a plant, information for the exchange of equipment parts, information for the history of plant operation, information for the monitoring and inspection, and information for the management of repair operation. In addition, it has an equipment part history management sub-system for managing equipment part exchange information, an operation history management sub-system for managing the operation state of the plant, an operation history management sub-system for managing equipment monitoring inspection data and operation management sub-system for managing periodical inspection/ repairing operation. These sub-systems are collectively combined to manage the maintenance and management jobs of the plant unitarily. (I.S.)

  16. Monitoring of overalls and personnel skin contamination

    International Nuclear Information System (INIS)

    Turkin, N.F.

    1980-01-01

    Organization of monitoring of overalls and personnel skin contamination wastes is considered. The devices used for this purpose are enumerated. In sanitary sluices through which the personnel leaving the repair zone it is recommended to particularly thoroughly control hand skin contamination and most contaminated parts of overalls (sleeves, breeches lower parts, pockets, stomack region). In sanitary check points during personnel leaving the operator zone monitoring of overalls and skin contamination is performed. The overalls and other individual protective clothing are subjected to control in a special loundry before and after washing (decontamination) [ru

  17. Paranal maintenance and CMMS experience

    Science.gov (United States)

    Montano, Nelson

    2004-10-01

    During the last four years of operations, low technical downtime has been one of the relevant records of the Paranal Observatory. From the beginning of the Very Large Telescope (VLT) project, European Southern Observatory (ESO) has considered the implementation of a proper maintenance strategy a fundamental point in order to ensure low technical down time and preserve the Observatory's assets. The implementation of the maintenance strategy was based on the following aspects: - Strong maintenance sense during the design stage. Line Replacement Unit (LRU) concept, standardization and modularity of the Observatory equipment - Creation of a dedicated team for Maintenance - The implementation of a Computerized Maintenance Management System After four operational years, the result of these aspects has exceeded the expectations; the Observatory has been operating with high availability under a sustainable strategy. The strengths of the maintenance strategy have been based on modern maintenance concepts applied by regular production companies, where any minute of down time involves high cost. The operation of the actual Paranal Maintenance System is based mainly on proactive activities, such as regular inspections, preventive maintenance (PM) and predictive maintenance (PdM) plans. Nevertheless, it has been necessary to implement a strong plan for corrective maintenance (CM). The Spare Parts Strategy has also been an important point linked to the Maintenance Strategy and CMMS implementation. At present, almost 4,000 items related to the Observatory spare parts are loaded into the CMMS database. Currently, we are studying the implementation of a Reliability Centered Maintenance (RCM) project in one of our critical systems The following document presents the actual status of the Paranal Maintenance Strategy and which have been the motivations to implement the established strategy.

  18. Operations and maintenance plans for the TFTR

    International Nuclear Information System (INIS)

    Allen, H.L.; Fedor, B.J.

    1978-01-01

    Princeton University Plasma Physics Laboratory (PPPL) is constructing a Tokamak Fusion Test Reactor (TFTR) scheduled to begin operation for fusion research experiments in late 1981, first with hydrogen and deuterium plasmas and later, in the second phase, using tritium for high power fusion studies. This latter mode will introduce considerable complexity to operation and maintenance of the TFTR in terms of meeting requirements for tritium handling, adequate radiation shielding, and corrective and preventive maintenance procedures. In this paper we discuss plans for the installation and preoperational testing of the major subsystems of TFTR, proposed start-up and operating scenarios for the device and the system of operational control. In addition, the TFTR Maintenance Plan and related procedures for specific major maintenance tasks are described, including the use of remote handling equipment and remote manipulators. Each of these topics is addressed in terms of the current status of planning and development

  19. Guidelines for safe process operations and maintenance

    CERN Document Server

    2010-01-01

    First-line managers have to maintain the integrity of facilities, control manufacturing processes, and handle unusual or emergency situations, as well as respond to the pressures of production demand. On a daily basis, they are closest to the operating personnel who may be injured by a process accident, and they are in the best position to spot problem conditions and to act to contain them. This book offers these managers ""how-to"" information on process safety management program execution in the operations and maintenance departments, recommending technical and administrative process safety

  20. Experience in operation and maintenance of PWRs

    International Nuclear Information System (INIS)

    Broecker, H.; Schomer, E.

    1987-01-01

    At present there are 10 PWRs in operation, most of them built on turnkey basis by KWU. The availability of West German PWRs amounted to 84.7% on average for the period from 1982-86. The good operating results are attributable to the following: 1. Sophiticated design and layout of the plant with good accessibility to the primary system even during operation. 2. Reliable performance of plant and components as result of extensive quality assurance. 3. Well-organized and highly qualified operating personnel. 4. Inservice inspection and preventive maintenance. 5. Good information feedback system. (Liu)

  1. Human errors related to maintenance and modifications

    International Nuclear Information System (INIS)

    Laakso, K.; Pyy, P.; Reiman, L.

    1998-01-01

    about weakness in audits made by the operating organisation and in tests relating to plant operation. The number of plant-specific maintenance records used as input material was high and the findings were discussed thoroughly with the plant maintenance personnel. The results indicated that instrumentation is more prone to human error than the rest of maintenance. Most errors stem from refuelling outage periods and about a half of them were identified during the same outage they were committed. Plant modifications are a significant source of common cause failures. The number of dependent errors could be reduced by improved co-ordination and auditing, post-installation checking, training and start-up testing programmes. (orig.)

  2. Integrated services and maintenance in nuclear power plants

    International Nuclear Information System (INIS)

    Roos, Georg

    2001-01-01

    The general situation concerning services and nuclear power maintenance is reviewed following liberalization of Europa's power market. Issues relating to outsourcing maintenance services, effectiveness and reducing cost structure of maintenance are addressed on the cases of power markets in northern countries, Spain, Switzerland, Germany and Hungary. A special attention is paid on range of maintenance activity offered and performanced by Framatome. Ways of reducing costs in the field of maintenance as well as of reducing outage time are indicated. In conclusion, the following items are emphasized: - liberalization of Europe's power market in eastern Europe at its beginning; - in-house service in eastern Europe with numerous personnel; - Framatome ANP covers the entire range of maintenance competence; - consultance can be the first approach for a common co-operation

  3. Patient and personnel exposure during extracorporeal lithotripsy

    International Nuclear Information System (INIS)

    Glaze, S.; LeBlanc, A.D.; Bushong, S.C.; Griffith, D.P.

    1987-01-01

    Extracorporeal shock wave lithotripsy (ESWL) has provided a nonsurgical approach to treatment of renal stones. The Dornier lithotripter uses dual image intensified x-ray systems to center the stone before treatment. Three imaging modes are offered: a fluoroscopic mode and two video spot filming modes. The average entrance exposure to the stone side of the typical patient at our facility is 2.6 X 10(-3) C kg-1 (10 R) [range: 0.5-7.7 X 10(-3) C kg-1 (2-30 R)] which is comparable and often much less than that reported for percutaneous lithotripsy. Recommendations are made for minimizing patient exposure. Scattered radiation levels in the lithotripter room are presented. We have determined that Pb protective apparel is not required during this procedure provided x-ray operation is temporarily halted should personnel be required to lean directly over the tub to attend to the patient. If the walls of the ESWL room are greater than 1.83 m (6 feet) from the tub, shielding in addition to conventional construction is not required

  4. Patient and personnel exposure during extracorporeal lithotripsy

    Energy Technology Data Exchange (ETDEWEB)

    Glaze, S.; LeBlanc, A.D.; Bushong, S.C.; Griffith, D.P.

    1987-12-01

    Extracorporeal shock wave lithotripsy (ESWL) has provided a nonsurgical approach to treatment of renal stones. The Dornier lithotripter uses dual image intensified x-ray systems to center the stone before treatment. Three imaging modes are offered: a fluoroscopic mode and two video spot filming modes. The average entrance exposure to the stone side of the typical patient at our facility is 2.6 X 10(-3) C kg-1 (10 R) (range: 0.5-7.7 X 10(-3) C kg-1 (2-30 R)) which is comparable and often much less than that reported for percutaneous lithotripsy. Recommendations are made for minimizing patient exposure. Scattered radiation levels in the lithotripter room are presented. We have determined that Pb protective apparel is not required during this procedure provided x-ray operation is temporarily halted should personnel be required to lean directly over the tub to attend to the patient. If the walls of the ESWL room are greater than 1.83 m (6 feet) from the tub, shielding in addition to conventional construction is not required.

  5. The nuclear power plant maintenance personnel reliability prediction (NPP/MPRP) effort at Oak Ridge National Laboratory

    International Nuclear Information System (INIS)

    Knee, H.E.; Haas, P.M.; Siegel, A.I.

    1982-01-01

    Human errors committed during maintenance activities are potentially a major contribution to the overall risk associated with the operation of a nuclear power plant (NPP). An NRC-sponsored program at Oak Ridge National Laboratory is attempting to develop a quantitative predictive technique to evaluate the contribution of maintenance errors to the overall NPP risk. The current work includes a survey of the requirements of potential users to ascertain the need for and content of the proposed quantitative model, plus an initial job/task analysis to determine the scope and applicability of various maintenance tasks. In addition, existing human reliability prediction models are being reviewed and assessed with respect to their applicability to NPP maintenance tasks. This paper discusses the status of the program and summarizes the results to date

  6. Maintenance Production Demand and Capacity Analysis of Third Maintenance Battalion

    Science.gov (United States)

    2017-12-01

    Delivery T/E Table of Equipment TFSMS Total Force Structure Management System TFSP Total Force Structure Process TM Technical Manual T/O Table of...exercises each year, both on Okinawa and throughout the Pacific theater. When equipment requires maintenance beyond the organizational -level...demand was analyzed based on customer cycle time (i.e., time that equipment was in Third Maintenance Battalion custody), maintenance cycle time during

  7. 49 CFR 193.2713 - Training: operations and maintenance.

    Science.gov (United States)

    2010-10-01

    ... first-aid; and (3) All operating and appropriate supervisory personnel— (i) To understand detailed... 49 Transportation 3 2010-10-01 2010-10-01 false Training: operations and maintenance. 193.2713... LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Personnel Qualifications and Training § 193.2713...

  8. Construction history and construction management

    International Nuclear Information System (INIS)

    Agh, S.

    1999-01-01

    The process of pre-design and design preparation of the Mochovce NPP as well as the construction history of the plant is highlighted, including the financing aspect and problems arising from changes in the technological and other conditions of start-up of the reactor units. The results of international audits performed to improve the level of nuclear safety and implementation of the measures suggested are also described. The milestones of the whole construction process and start-up process, the control and quality system, and the methods of control and management of the complex construction project are outlined. (author)

  9. Equipment and special tool design for remote maintenance

    International Nuclear Information System (INIS)

    Northey, L.M.; Thomson, J.D.

    1985-01-01

    Maintenance tasks performed in locations with hostile environments and/or limited space accesses often require equipment that is operated remotely. This paper discusses considerations that should be addressed in the design of remote maintenance equipment. Some of the topics include proper material selection, interface identifications, operational feedback devices and cost limitations. These considerations add ''human engineering'' to the equipment design to assure protection of the tool and the operating personnel. Examples of remote maintenance and inspection systems that were developed by the Westinghouse Hanford Company and that utilize many of these design considerations are included

  10. Optimisation of maintenance and inspection work in nuclear power plants

    International Nuclear Information System (INIS)

    Meyer, V.

    1996-01-01

    The long-term planning and comparative evaluation of inspection and maintenance intervals as well as results of electric components and machinery have to be intensified in order to shorten maintenance shut-down periods, e.g. of the Grohnde reactor station, thus improving the availability of the plant and the specific electricity generation cost. Economically efficient maintenance has to be based on an efficient organisational structure. Outsourcing of less plant-specific work and tasks offers the possibility for in-house personnel to concentrate on their core competences. All the measures discussed contribute to improving the economic efficiency of the nuclear power plants. (orig./DG) [de

  11. Double-Shell Tank (DST) Maintenance and Recovery Subsystem Definition Report

    International Nuclear Information System (INIS)

    SMITH, E.A.

    2000-01-01

    The description of the Double-Shell Tank (DST) Maintenance and Recovery Subsystem presented in this document was developed to establish its boundaries. The DST Maintenance and Recovery Subsystem consists of new and existing equipment and facilities used to provide tank farm operators logistic support and problem resolution for the DST System during operations. This support will include evaluating equipment status, performing preventive and corrective maintenance, developing work packages, managing spares and consumables, supplying tooling, and training maintenance and operations personnel

  12. Planning and management support for NPP personnel SAT-based training programmes

    International Nuclear Information System (INIS)

    Ziakova, M.

    1998-01-01

    This paper deals with planning and management support for NPP personnel SAT based training programmes based on IAEA TC Project SLR/0/003 on upgrading NPP personnel training, with the aim of upgrading NPP safety and reliability of NPP operation and maintenance. The costs needed include both Slovak and IAEA sources. Five stages of the Project are defined: planning; organizing; motivating; implementation; control, review and accountability

  13. Automation of Personnel Certification Roadbuilding Departments and Enterprises

    Directory of Open Access Journals (Sweden)

    Andrey Vladimirovich Ostroukh

    2015-10-01

    Full Text Available The article suggests science-based solutions to improve the efficiency of personnel certification of road construction departments and enterprises by developing an integrated learning environment based on an automated system of distance learning with the open source software and methodological support, tailored to the professional standards. Personnel certification procedure of road construction departments and enterprises for optimization and automation is analyzed. Optimization solutions for all stages of the preparation and conduction conformance testing to create test tasks for batch import of test tasks in a database of test tasks and adaptive algorithm for bringing the subject of tests proposed and implemented. The developed technique of adaptive presentation may perform various functions, depending on the settings of the algorithm.

  14. Integrated Personnel and Pay System-Army Increment 2 (IPPS-A Inc 2)

    Science.gov (United States)

    2016-03-01

    system maintenance, and minimizing pay discrepancies . IPPS-A Inc 2 will account for status changes between Active, Reserve, and National Guard components...2016 Major Automated Information System Annual Report Integrated Personnel and Pay System-Army Increment 2 (IPPS-A Inc 2) Defense Acquisition...703-325-3747 DSN Phone: 865-2915 DSN Fax: 221-3747 Date Assigned: May 2, 2014 Program Information Program Name Integrated Personnel and Pay System

  15. Education and training for security personnel

    International Nuclear Information System (INIS)

    Chida, Toshiya

    2015-01-01

    It is said that Physical Protection (PP) has two purposes. One is to prevent from occurring risks of threat and terrorism and the other is to minimize damages which will be happened in case of unusual conditions or emergency situation. To achieve this goal, personnel who perform their duties should have professional knowledge and skills concerning security. However, since newcomers rarely satisfy their knowledge and skill for nuclear security in most cases. Therefore, we have to provide adequate education and training after they joined to our company. To this end, our company, located in Aomori Prefecture focused on security and physical protection for nuclear related facilities. In this paper, personnel training and challenges in order to bring up security personnel at our company will be introduced. (author)

  16. Space Telescope maintenance and refurbishment

    Science.gov (United States)

    Trucks, H. F.

    1983-01-01

    The Space Telescope (ST) represents a new concept regarding spaceborne astronomical observatories. Maintenance crews will be brought to the orbital worksite to make repairs and replace scientific instruments. For major overhauls the telescope can be temporarily returned to earth with the aid of the Shuttle. It will, thus, be possible to conduct astronomical studies with the ST for two decades or more. The five first-generation scientific instruments used with the ST include a wide field/planetary camera, a faint object camera, a faint object spectrograph, a high resolution spectrograph, and a high speed photometer. Attention is given to the optical telescope assembly, the support systems module, aspects of mission and science operations, unscheduled maintenance, contingency orbital maintenance, planned on-orbit maintenance, ground maintenance, ground refurbishment, and ground logistics.

  17. Applying artificial intelligence to safety and maintenance (in nuclear plants)

    International Nuclear Information System (INIS)

    Anon.

    1987-01-01

    Under contract from the US DoE, Odetics Inc. is developing a prototype advisory expert system which may eventually be used for the maintenance and safety of a nuclear plant. The objective of the system will be to determine off-normal conditions and to help operations personnel through a course of action which would lead to a stable plant. (UK)

  18. PAMTRAK: A personnel and material tracking system

    International Nuclear Information System (INIS)

    Anspach, D.A.; Anspach, J.P.; Crain, B. Jr.

    1996-01-01

    There is a need for an automated system for protecting and monitoring sensitive or classified parts and material. Sandia has developed a real-time personnel and material tracking system (PAMTRAK) that has been installed at selected DOE facilities. It safeguards sensitive parts and material by tracking tags worn by personnel and by monitoring sensors attached to the parts or material. It includes remote control and alarm display capabilities and a complementary program in Keyhole to display measured material attributes remotely. This paper describes the design goals, the system components, current installations, and the benefits a site can expect when using PAMTRAK

  19. Proceedings of the Canadian Institute conference on supply chain management in the oil and gas industry : major capital construction projects, maintenance, repair and operations

    International Nuclear Information System (INIS)

    2005-01-01

    Many companies are now being forced to focus on careful budgeting to ensure that the capital costs of large-scale construction projects do not exceed their budgets. Operators are now investigating the role of supply chain management in reducing project costs. This conference provided a forum for the discussion of issues related to large construction projects for supply chain management in the oil and gas industry. Participants at the conference discussed methods of negotiating with contractors in order to manage higher prices for steel and other commodities. Best practices for maintaining effective purchaser-contractor relations were discussed along with cost benchmarks in contracts and management planning techniques for supply chain processes. The benefits of adopting vendor-managed inventory systems were also examined. Sourcing strategies were presented and issues related to transportation were reviewed along with various planning models. The conference featured 16 presentations. tabs., figs

  20. Human factors issues in aircraft maintenance and inspection : "information exchange and communications".

    Science.gov (United States)

    1990-11-01

    The Federal Aviation Administration sponsored a 2-day meeting in December 1989 as part of a continuing program to address issues of human factors and personnel performance in aviation maintenance and inspection. This meeting focused on issues of "inf...

  1. Nuclear power plant personnel training and its evaluation. A guidebook

    International Nuclear Information System (INIS)

    1996-01-01

    The Guidebook will prove especially useful for, and is addressed primarily to: nuclear power operating organizations establishing or upgrading their NPP personnel training systems; regulatory personnel responsible for setting requirements and/or evaluating NPP personnel training; and organizations (within or outside the operating organization) responsible for the development, implementation and evaluation of training programmes for NPP personnel. Figs, tabs

  2. FIELD-PRODUCED JP-8 STANDARD FOR CALIBRATION OF LOWER EXPLOSIVE LIMIT METERS USED BY JET FUEL TANK MAINTENANCE PERSONNEL

    Science.gov (United States)

    Thousands of military personnel and tens of thousands of civilian workers perform jet fuel tank entry procedures. Before entering the confined space of a jet fuel tank, OSHA regulations (29CFR1910.146) require the internal atmosphere be tested with a calibrated, direct-reading...

  3. Operation and maintenance strategies for wave energy converters

    DEFF Research Database (Denmark)

    Ambühl, Simon; Marquis, Laurent; Kofoed, Jens Peter

    2015-01-01

    costs including costs due to lost electricity production are minimized. The risk-based approach is compared with an approach where only boats are used and another approach where the target is to minimize the downtime of the device. This article presents a dynamic approach for total operation......Inspection and maintenance costs are a significant contributor to the cost of energy for wave energy converters. There are different operation and maintenance strategies for wave energy converters. Maintenance can be performed after failure (corrective) or before a breakdown (preventive) occurs....... Furthermore, a helicopter and boats can be used to transport equipment and personnel to the device, or the whole device can be towed to a harbour for operation and maintenance actions. This article describes, among others, a risk-based inspection and maintenance planning approach where the overall repair...

  4. Constructed wetlands for pollution control: processes, performance, design and operation

    National Research Council Canada - National Science Library

    2000-01-01

    .... Types of constructed wetland, major design parameters, role of vegetation, hydraulic patterns, loadings, treatment efficiency, construction, operation and maintenance costs are discussed in depth...

  5. Personnel radiation dosimetry symposium: program and abstracts

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    The purpose was to provide applied and research dosimetrists with sufficient information to evaluate the status and direction of their programs relative to the latest guidelines and techniques. A technical program was presented concerning experience, requirements, and advances in gamma, beta, and neutron personnel dosimetry.

  6. Personnel radiation dosimetry symposium: program and abstracts

    International Nuclear Information System (INIS)

    1984-10-01

    The purpose was to provide applied and research dosimetrists with sufficient information to evaluate the status and direction of their programs relative to the latest guidelines and techniques. A technical program was presented concerning experience, requirements, and advances in gamma, beta, and neutron personnel dosimetry

  7. On-the-job training and qualification of nuclear power plant personnel. OJT at the Loviisa NPP

    International Nuclear Information System (INIS)

    1996-01-01

    On-the-job training and qualification process of nuclear power plant personnel is described, including the following issues: educational system of technical studies in Finland; training methods at the Loviisa NPP; on-the-job training of control room operators,field operators, maintenance personnel, other groups of the plant; qualifying examinations for different jobs

  8. Urban public space materials. Maintenance and design?

    Directory of Open Access Journals (Sweden)

    Manuel Iglesias Campos

    2016-10-01

    Full Text Available In this paper, certain aspects related to the conservation of materials commonly used in the design of public spaces are analysed and discussed from a starting point of maintenance definition. The main area of discussion is whether materials selection for pavements and urban furniture, and their placement in the designed space, take into account their maintenance needs. Here the definition of maintenance is the cleaning and repair done by municipal services that is always necessary after construction. From certain examples it can be concluded that, in several cases, the form, the organization and the distribution of the different elements within the public space can cause difficulties for its appropriate conservation, giving rise to alterations and consequently having a negative impact on the durability of this space.

  9. Genetic variation and its maintenance

    International Nuclear Information System (INIS)

    Roberts, D.F.; De Stefano, G.F.

    1986-01-01

    This book contains several papers divided among three sections. The section titles are: Genetic Diversity--Its Dimensions; Genetic Diversity--Its Origin and Maintenance; and Genetic Diversity--Applications and Problems of Complex Characters

  10. 76 FR 12507 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Science.gov (United States)

    2011-03-07

    ... customers; and 7. Workforce satisfaction with the personnel management system. An evaluation model was... personnel system under an appropriate demonstration project as defined in section 342(b) of Public Law 103... was deleted with the actual construct of pay pools to be further defined in the Demonstration Project...

  11. Emergency team personnel and technical equipment

    International Nuclear Information System (INIS)

    Muralt, R.

    1989-01-01

    The most important requirements for the emergency team can be summarized in three points. 1) The emergency team must be made up of top personnel from all fields and it should be functionally equiped. 2) The emergency teams must have complete command of their equipment. 3) The members of the team must be well motivated. 1 fig

  12. Managing Custodial and Maintenance Staffs.

    Science.gov (United States)

    Fickes, Michael

    2001-01-01

    Presents some basic maintenance management techniques that can help schools meet their budgets, preserve staffing levels, meet productivity needs, and sustain quality services. Tips for staff recruitment, training, and retention are explored. (GR)

  13. Environmental standards and project construction: A review

    International Nuclear Information System (INIS)

    Mason, P.F.; Thornberry, H.L.

    1991-01-01

    In the past decade, changes have occurred in the area of environmental regulation. This paper identifies the typical environmental standards applicable to project construction, recent environmental regulatory issues and trends, and identifies new environmental issues which must be considered in project construction. These include (1) handling hazardous chemicals in the workplace, (2) construction at formerly utilized sites, (3) disposal of debris, construction materials and hazardous waste, and (4) training and experience of construction personnel in environmental issues

  14. Education and training of operators and maintenance staff at commercial nuclear power stations in Japan

    International Nuclear Information System (INIS)

    Takahashi, M.; Kataoka, H.

    1998-01-01

    Safe and stable operation of a nuclear power station requires personnel fostering. In Japan, with the objectives of systematically securing qualified people for a long period of time, and maintaining and improving their skills and knowledge, the utilities have created strict personnel training plans, for continuous education and training. Concrete examples of education and training for operators and maintenance personnel at commercial nuclear power stations in Japan, such as education systems training, facility and contents of curriculum, are detailed including some related matters. Recent activities to catch up with environment changes surrounding education and training of operators and maintenance staff are also mentioned. (author)

  15. Depot Maintenance: Executed Workload and Maintenance Operations at DOD Depots

    Science.gov (United States)

    2017-02-03

    in turn enable testing of helicopter rotor blades. The Army has also made investments in logistics software at all of its depots. According to the...maintenance and repair of structural helicopter airframes and blades; advanced composite technologies; flight controls and control surfaces; and...level maintenance on a wide range of vehicles and other military assets, including helicopters , combat vehicles, ships, aircraft, engines, and software

  16. Ethnic Minority Personnel Careers: Hindrances and Hopes

    OpenAIRE

    Ross, Catharine

    2004-01-01

    Personnel departments often have particular responsibility for equal opportunities within their organizations. This paper explores equal opportunities within personnel departments themselves, in relation to the careers of ethnic minority personnel practitioners. Through primary research, it identifies a range of criteria which can affect personnel careers, of which ethnic origin is often one. However, although being categorized as of ethnic minority origin often hinders personnel careers, the...

  17. Risk-Informed Decisions Optimization in Inspection and Maintenance

    International Nuclear Information System (INIS)

    Robertas Alzbutas

    2002-01-01

    The Risk-Informed Approach (RIA) used to support decisions related to inspection and maintenance program is considered. The use of risk-informed methods can help focus the adequate in-service inspections and control on the more important locations of complex dynamic systems. The focus is set on the highest risk measured as conditional core damage frequency, which is produced by the frequencies of degradation and final failure at different locations combined with the conditional failure consequence probability. The probabilities of different degradation states per year and consequences are estimated quantitatively. The investigation of inspection and maintenance process is presented as the combination of deterministic and probabilistic analysis based on general risk-informed model, which includes the inspection and maintenance program features. Such RIA allows an optimization of inspection program while maintaining probabilistic and fundamental deterministic safety requirements. The failure statistics analysis is used as well as the evaluation of reliability of inspections. The assumptions regarding the effectiveness of the inspection methods are based on a classification of the accessibility of the welds during the inspection and on the different techniques used for inspection. The probability of defect detection is assumed to depend on the parameters either through logarithmic or logit transformation. As example the modeling of the pipe systems inspection process is analyzed. The means to reduce a number of inspection sites and the cumulative radiation exposure to the NPP inspection personnel with a reduction of overall risk is presented together with used and developed software. The developed software can perform and administrate all the risk evaluations and ensure the possibilities to compare different options and perform sensitivity analysis. The approaches to define an acceptable level of risk are discussed. These approaches with appropriate software in

  18. Tunnel Boring Machine Cutter Maintenance for Constructing Underground Cable Lines from Nuclear Power Plants

    International Nuclear Information System (INIS)

    Lee, Jae Wang; Yee, Eric

    2014-01-01

    The tunnel boring machine (TBM) can construct an underground tunnel efficiently and without construction noise vibration related problems. Many civil projects, such as NPP construction, set importance on the economics of construction. Thus, advance rate, which is the speed at which the TBM is able to progress along its intended route, is one of the key factors affecting construction period and construction expenses. As the saying goes, time is money. Right Double Quotation Mark In addition, it is important to manage construction permits and civil complaints, even when construction expenses and construction periods are excluded. So, accurate prediction for advance rate is important when designing tunnel project. Several designers and project owners have tried to improve construction efficiency and tunneling advance rate.. There have been several studies on managing the rate of wear, designing an optimum tunnel face, and finding the optimum cutter spacing. Cutter replacements due to cutter wear and tear are very important because the wear and tear of cutters attached to the cutter head profoundly affect the advance rate. To manage cutter wear and tear is to control parameters related to cutter shape and cutter wear rate. There have been studies on the relationship between rock properties or TBM characteristics, and cutter wear or replacement. However, many of these studies relied on computer simulations or other small scale experiments. Therefore, this paper attempts to present a correlation between cutter replacement or cutter wear, against various parameters using practical data such as rock quality and TBM shield specifications, from an actual construction site. This study was conducted to suggest directions in the improvement of TBM cutters by analyzing relationships between rock conditions and cutter maintenance as well as TBM advance rates. Actual field data was collected and compared to actual design values in evaluating the effectiveness of traditional

  19. Tunnel Boring Machine Cutter Maintenance for Constructing Underground Cable Lines from Nuclear Power Plants

    Energy Technology Data Exchange (ETDEWEB)

    Lee, Jae Wang; Yee, Eric [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2014-10-15

    The tunnel boring machine (TBM) can construct an underground tunnel efficiently and without construction noise vibration related problems. Many civil projects, such as NPP construction, set importance on the economics of construction. Thus, advance rate, which is the speed at which the TBM is able to progress along its intended route, is one of the key factors affecting construction period and construction expenses. As the saying goes, time is money. Right Double Quotation Mark In addition, it is important to manage construction permits and civil complaints, even when construction expenses and construction periods are excluded. So, accurate prediction for advance rate is important when designing tunnel project. Several designers and project owners have tried to improve construction efficiency and tunneling advance rate.. There have been several studies on managing the rate of wear, designing an optimum tunnel face, and finding the optimum cutter spacing. Cutter replacements due to cutter wear and tear are very important because the wear and tear of cutters attached to the cutter head profoundly affect the advance rate. To manage cutter wear and tear is to control parameters related to cutter shape and cutter wear rate. There have been studies on the relationship between rock properties or TBM characteristics, and cutter wear or replacement. However, many of these studies relied on computer simulations or other small scale experiments. Therefore, this paper attempts to present a correlation between cutter replacement or cutter wear, against various parameters using practical data such as rock quality and TBM shield specifications, from an actual construction site. This study was conducted to suggest directions in the improvement of TBM cutters by analyzing relationships between rock conditions and cutter maintenance as well as TBM advance rates. Actual field data was collected and compared to actual design values in evaluating the effectiveness of traditional

  20. [Education and Training of Personnel in Morphology].

    Science.gov (United States)

    Katagiri, Hisako; Yamagata, Junko

    2016-02-01

    We introduce our efforts to utilize education, training, competence assessment, and quality control of personnel engaged in urinary sediment and blood cell morphology examinations in our laboratory. There are no standard samples for these morphological examinations, and standardization has not been completed for all types of blood cells or urinary sediment components. We had been carrying out simultaneous microscopic examination involving trainee staff and senior laboratory technologists as a means of education and evaluation, but acceptance criteria were unclear. Moreover, we had continued our operation without assessment of the level of achievement of routine works or the competence of individual staff members. Taking the opportunity of receiving ISO 15189 certification, we have been able to establish clear standards for evaluating personnel education and training in morphological examinations. We will continuously make efforts to maintain and manage this system.

  1. Education and training of operators and maintenance staff at Hamaoka Nuclear Power Stations

    International Nuclear Information System (INIS)

    Makido, Hideki; Hayashi, Haruhisa

    1999-01-01

    At Hamaoka Nuclear Power Station, in order to ensure higher safety and reliability of plant operation, education and training is provided consistently, on a comprehensive basis, for all operating, maintenance and other technical staff, aimed at developing more capable human resources in the nuclear power division. To this end, Hamaoka Nuclear Power Station has the 'Nuclear Training Center' on its site. The training center provides the technical personnel including operators and maintenance personnel with practical training, utilizing simulators for operation training and the identical facilities with those at the real plant. Thus, it plays a central role in promoting comprehensive education and training concerning nuclear power generation. Our education system covers knowledge and skills necessary for the safe and stable operation of nuclear power plant, targeting new employees to managerial personnel. It is also organized systematically in accordance with experience and job level. We will report the present education and training of operators and maintenance personnel at Hamaoka Nuclear Training Center. (author)

  2. An Investigation of the Facets for Converting Military Authorizations for Maintenance Personnel to Civilian Positions

    Science.gov (United States)

    1984-03-01

    schools (both technical institutes and colleges), as well as othpr private sector employers for people. If the nonmilitary competition is successful...a day. A recent Federal Times article stated that "hundreds of thousands of federal jobs must be reviewed for possible conversion to the private ...XXXIV, No. 4 (19 February 1982). "Quality of Worklife -SAC," The Inspector General Brief. Vol. XXXIV, No. 9 (30 April 1982). Official Documents

  3. Personnel education and training at Bohunice NPP

    International Nuclear Information System (INIS)

    Malovec, J.

    1998-01-01

    Procedure for education and training of all the personnel employed at Bohunice Nuclear power plant is presented in detail describing the training system structure, kinds of training, staff members qualification development, short term and long term tasks needed to assure attaining the training objectives. The proposed Staff Members Lifetime education implementation project contains basic starting points, measures to be implemented by 1998. It was prepared on the basis of a primary analysis which confirmed the existing need for implementing the lifetime education system

  4. TRAINING ON PERSONNEL MANAGEMENT AND LABOR ECONOMICS

    Directory of Open Access Journals (Sweden)

    Marina V. Polevaya

    2016-01-01

    Full Text Available The article deals with the training of spe-cialists in the eld of labor and the house-keeper personnel management within the federal state educational standards of higher education. The analysis of the possibility of training in these specialties in the various educational standards. The necessity of focusing on the prepara-tion of these destinations within certain standards.

  5. Manpower, Personnel, and Training Assessment (MPTA) Handbook

    Science.gov (United States)

    2015-11-01

    programs. 8. Target Audience Description ( TAD ) The TAD is the initial description of the number and type of personnel required to operate, maintain...requirements, etc.) describing the Soldiers operating or maintaining the system. In cases where operating a system requires a security clearance, the TAD ...Authority. Milestone Decision Authority Target Audience Description ( TAD ) AR 602-2 AR 611-1 DA Pam 611-21 X X X X X X The TAD lists

  6. Personnel Recruitment and Retention Strategies in Lagos State Civil ...

    African Journals Online (AJOL)

    Personnel Recruitment and Retention Strategies in Lagos State Civil Service of Nigeria. ... The results show that the strategy for personnel recruitment into the CS is based on mixtures of merit and political ... AJOL African Journals Online.

  7. Plant inspection and maintenance technology

    International Nuclear Information System (INIS)

    Miyahara, Masatoshi; Kanazawa, Masafumi

    1995-01-01

    The article reports on information systems and related tools that support routine inspection and preventive maintenance activities, which contribute to safer plant operation and increase plant operating duty. Tools include the Mitsubishi Electric Reliability and Availability Upgrade Program-Nuclear (MELRAP-N), which supports the general evolution of industry operating experiences, periodic component replacement management, management of discontinued and modified components, periodic inspection item management, and periodic inspection workplace management. The article also introduces a comprehensive preventive maintenance management system currently under development. (author)

  8. Overview of maintenance principles and regulatory supervision of maintenance activities at nuclear power plants in Slovakia

    International Nuclear Information System (INIS)

    Rohar, S.; Cepcek, S.

    1997-01-01

    The maintenance represents one of the most important tools to ensure safe and reliable operation of nuclear power plants. The emphasis of Nuclear Regulatory Authority of the Slovak Republic to the maintenance issue is expressed by requirements in the regulations. The current practice of maintenance management in operated nuclear power plants in Slovak Republic is presented. Main aspects of maintenance, as maintenance programme, organization of maintenance, responsibilities for maintenance are described. Activities of nuclear regulatory authority in maintenance process are presented too. (author)

  9. 9 CFR 590.560 - Health and hygiene of personnel.

    Science.gov (United States)

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Health and hygiene of personnel. 590.560 Section 590.560 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF..., Processing, and Facility Requirements § 590.560 Health and hygiene of personnel. (a) Personnel facilities...

  10. Personnel management and job satisfaction in academic libraries: a ...

    African Journals Online (AJOL)

    Personnel management and job satisfaction in academic libraries: a case study of ... the level of staff development, identify the motivational factors of the library personnel, ... Questionnaire was used for this research as the main data collection ...

  11. Special training of craftsmen for maintenance and repair

    International Nuclear Information System (INIS)

    Scholz, H.E.

    1981-01-01

    The most important prerequisites for keeping nuclear power plants running safely and consistently are the reliable plant supervision and control by operators and shift engineers and its permanent servicing and maintenance as well as the performance of qualified repair work. Therefore, sophisticated training of qualified labour in the fields of mechanical engineering, electrical engineering and instrumentation and control is as important as of operators and shift engineers. The objectives of the relevant training measures for the personnel mentioned above are: Acquisition of solid basic skills in the respective professions, development of a broad background in how nuclear power plants are designed and function, gaining a sound insight into the working procedures in nuclear power plants, maintenance planning, duties and responsibilities of personnel involved, and acquiring thorough knowledge of the systems and its components, the assigned staff will be responsible for. (orig./RW)

  12. 30 CFR 77.1400 - Personnel hoists and elevators.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Personnel hoists and elevators. 77.1400 Section 77.1400 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Personnel Hoisting § 77.1400 Personnel...

  13. Personnel monitoring system by thermoluminescence dosimeter - a study and review

    International Nuclear Information System (INIS)

    Iyer, V.S.; Alok, M.; Chandel, B.S.

    2018-01-01

    The principle objective of personnel monitoring system is to prevent overexposure and avoid unnecessary exposure of personnel working with various sources of radiation. The adequate system of personnel monitoring must provide for the measurement. evaluation and recording of significant doses accumulated by individuals together with a recording of conditions under which these doses are received

  14. Manipulator techniques and problems of their application in primary circuit maintenance

    International Nuclear Information System (INIS)

    Kertscher, F.; Popp, P.

    1985-01-01

    The fundamental structure and specifications of manipulators (in particular of industrial robots) are presented in order to derive the application conditions and fields for manipulators in primary circuit maintenance. The necessity of applying process-specific manipulator technique in the primary circuit maintenance is based on nuclear safety requirements and on decreasing of the radiation exposure of maintenance personnel. Synchronous manipulators and industrial robots are the types of manipulators used in materials testing, repairing and scrapping. The technical requirements of manipulators are discussed

  15. Plant and equipment division laboratory services series: a ten-year building-maintenance cost history

    International Nuclear Information System (INIS)

    Keesee, H.F.

    1976-09-01

    Maintaining a multifacility national laboratory in a safe, reliable condition is a complex management responsibility in terms of budgets, costs, and proper utilization of personnel and material resources. Increasing wage rates and material costs, combined with decreased budgets and aging facilities, create unusual challenges to maintenance managers. A ten-year history of building-maintenance costs, a brief description of the maintenance program, analyses of personnel requirements, cost increase indexes, unit costs, cost controls, procedures, and a brief discussion of alterations and improvements are presented

  16. Remote operation and automation of the maintenance works under the radiation field

    Energy Technology Data Exchange (ETDEWEB)

    Asai, T; Koga, A; Shirasu, I; Miida, T

    1983-06-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenance works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today is difficult to replace with machines due to their diversified and complex nature.

  17. Remote operation and automation of the maintenance works under the radiation field

    Energy Technology Data Exchange (ETDEWEB)

    Asai, Takashi; Koga, Akihiko; Shirasu, Isao; Miida, Toshiro [Mitsubishi Heavy Industries Ltd., Tokyo (Japan)

    1983-08-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenence works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today are so difficult to replace with machines due to their deversified and complexed nature.

  18. Remote operation and automation of the maintenance works under the radiation field

    Energy Technology Data Exchange (ETDEWEB)

    Asai, Takashi; Koga, Akihiko; Shirasu, Isao; Miida, Toshiro [Mitsubishi Heavy Industries Ltd., Tokyo (Japan)

    1983-01-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenance works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today is so defficult to replace with machines due to their diversified and complexed nature.

  19. Remote operation and automation of the maintenance works under the radiation field

    International Nuclear Information System (INIS)

    Asai, Takashi; Koga, Akihiko; Shirasu, Isao; Miida, Toshiro

    1983-01-01

    More than ninety per cent of the personnel radiation exposure at the nuclear power station is attributable to the maintenence works during the plant shutdown. The maintenance robots have effectively contributed in reducing the annual inspection and refueling schedule and the personnel radiation exposure. Future prospects of robotics depend on the grade of development in robot technology and plant engineering itself to accommodate such robot tools, since plant facilities and maintenance procedure today is so difficult to replace with machines due to their deversified and complexed nature. (author)

  20. Training and Certification of Research Reactor Personnel

    International Nuclear Information System (INIS)

    Zarina Masood

    2011-01-01

    The safe operation of a research reactor requires that reactor personnel be fully trained and certified by the relevant authorities. Reactor operators at PUSPATI TRIGA Reactor underwent extensive training and are certified, ever since the reactor first started its operation in 1982. With the emphasis on enhancing reactor safety in recent years, reactor operator training and certification have also evolved. This paper discusses the changes that have to be implemented and the challenges encountered in developing a new training programme to be in line with the national standards. (author)

  1. Maintenance analysis method and operational feedback: a comprehensive maintenance management

    International Nuclear Information System (INIS)

    Mathieu Riou; Victor Planchon

    2006-01-01

    Full text of publication follows: Current periodic inspections program carried out on the COGEMA LOGISTICS casks is required by regulations and approved by the competent Authority. Thus, Safety and casks conformity to the according certificate of approval are guaranteed. Nonetheless, based on experience it appeared that some maintenance operations did not seem relevant or were redundant. Then, it was decided to rethink completely our maintenance program to reach the following objectives: - Set up the 'a minima' required inspection operations required to guarantee Safety and conformity to the certificate of approval, - Optimize criteria and periodicities of inspections taking into account: operational feedback, routine inspections carried out for each transport, regulations, environmental impact (ALARA, waste reduction,...), cost-effectiveness (reduction of cask's immobilization period,...). - Set up a maintenance program in Safety Analysis Reports that: stands alone (no need to check the specification or the certificate of approval to have the complete list of inspections mandatory to guarantee Safety), gives objectives instead of means of controls. This approach needs then to be re-evaluated by the competent Authority. Study's scope has been limited to the TN TM 12 cask family which is intensely used. COGEMA LOGISTICS has a high operational feedback on these casks. After Authority agreement, and in accordance with its requirements, study will then be extended to the other casks belonging to the COGEMA LOGISTICS cask fleet. Actually, the term 'maintenance' is linked to 'Base maintenance' and 'Main maintenance' and implicitly means that the cask is immobilized for a given period. To emphasize the modifications, the term 'maintenance' is no longer used and is substituted by 'periodic upkeep'. By changing the name, COGEMA LOGISTICS wants to emphasize that: some operations can for instance be realized while the cask is unloaded, periodicities are thought in terms of

  2. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  3. Design, maintenance and lifetime of nuclear components

    International Nuclear Information System (INIS)

    Noel, R.L.; Eisenhut, D.G.; Carey, J.J.; Reynes, L.J.

    1989-01-01

    Division D of SMiRT deals with experience feedback relating to the in-service behavior of nuclear components, the design and construction of this equipment, its maintenance and the evaluation and management of its lifetime. The nuclear industry now having reached maturity, with more than 300 units in service worldwide, these problems are now of predominant importance to the activity of the industry and in its development programs. This applies particularly to the problems relating to the lifetime of nuclear plants, problems which are rightly of such concern both to the utilities, in view of the enormous investments involved, and also to the safety authorities. These contributions have been reviewed for the purpose of analyzing the essential points. This analysis highlights the considerable advances achieved during the recent decades in design and maintenance methods and practices. It also identifies the areas in which progress still remains to be made

  4. Operations and maintenance - Safety challenges

    Energy Technology Data Exchange (ETDEWEB)

    Nielsen, Liv [Oljedirektoratet, Stavanger (Norway)

    1999-07-01

    With the unsteady oil prices and the possible consequences of the deregulation of the European energy markets one may expect further optimization of operating and maintenance costs. One may also expect extended use of various risk-based optimization techniques such as RCM (Reliability Centered Maintenance) and RBI (Risk Based Inspection). This presentation addresses the need for further research and development in this area. Maintenance work is necessary, but it can also create risk. The accident statistics show many examples of this. The Norwegian petroleum industry's ability to learn from previous incidents is questioned. Maintenance staff must be well trained and possess the necessary routines. Technical documentation must be updated. Uncertainties with respect to future oil and gas prices combined with the effect of the deregulation of the European energy markets will lead to even more focus on cost-effective operations and maintenance. The need for long-term research and development is stressed. Risk based techniques such as RCM and RBI are extensively used in the defence industry and the nuclear industry, but applying them to the petroleum industry requires improved risk models. Ageing effects such as corrosion, erosion, fatigue etc. can be expected, but the capability to predict, monitor and control them should be improved. At present, not even the most sophisticated risk analysis can model ageing effects. The importance of efficient use of information technology (IT) is stressed. Improving the product quality and safety often requires new technology and so research and development is important. Close cooperation with the industry is required.

  5. Maintenance of reactor safety and control computers at a large government facility

    International Nuclear Information System (INIS)

    Brady, H.G.

    1985-01-01

    In 1950 the US Government contracted the Du Pont Company to design, build, and operate the Savannah River Plant (SRP). At the time, it was the largest construction project ever undertaken by man. It is still the largest of the Department of Energy facilities. In the nearly 35 years that have elapsed, Du Pont has met its commitments to the US Government and set world safety records in the construction and operation of nuclear facilities. Contributing factors in achieving production goals and setting the safety records are a staff of highly qualified personnel, a well maintained plant, and sound maintenance programs. There have been many ''first ever'' achievements at SRP. These ''firsts'' include: (1) computer control of a nuclear rector, and (2) use of computer systems as safety circuits. This presentation discusses the maintenance program provided for these computer systems and all digital systems at SRP. An in-house computer maintenance program that was started in 1966 with five persons has grown to a staff of 40 with investments in computer hardware increasing from $4 million in 1970 to more than $60 million in this decade. 4 figs

  6. Methacrylate and acrylate allergy in dental personnel.

    Science.gov (United States)

    Aalto-Korte, Kristiina; Alanko, Kristiina; Kuuliala, Outi; Jolanki, Riitta

    2007-11-01

    Methacrylates are important allergens in dentistry. The study aimed to analyse patch test reactivity to 36 acrylic monomers in dental personnel in relation to exposure. We reviewed the test files at the Finnish Institute of Occupational Health from 1994 to 2006 for allergic reactions to acrylic monomers in dental personnel and analysed the clinical records of the sensitized patients. 32 patients had allergic reactions to acrylic monomers: 15 dental nurses, 9 dentists, and 8 dental technicians. The dentists and dental nurses were most commonly exposed to 2-hydroxyethyl methacrylate (2-HEMA), triethyleneglycol dimethacrylate (TREGDMA), and 2,2-bis[4-(2-hydroxy-3-methacryloxypropoxy) phenyl]propane (bis-GMA). 8 dentists and 12 dental nurses were allergic to 2-HEMA. The remaining dentist was positive to bis-GMA and other epoxy acrylates. The remaining 3 dental nurses reacted to diethyleneglycol diacrylate (DEGDA) or triethyleneglycol diacrylate (TREGDA), but not to monofunctional and multifunctional methacrylates. Our dental technicians were mainly exposed and sensitized to methyl methacrylate (MMA) and ethyleneglycol dimethacrylate (EGDMA). 1 technician reacted only to 2-HEMA, and another to ethyl methacrylate (EMA) and ethyl acrylate (EA). 2-HEMA was the most important allergen in dentists and dental nurses, and MMA and EGDMA in dental technicians. Reactions to bis-GMA, DEGDA, TREGDA, EMA and EA were relevant in some patients.

  7. Remote operation and maintenance support services for nuclear power plants

    International Nuclear Information System (INIS)

    Yamamoto, Hiroki; Higuma, Koji; Shimizu, Shunichi; Sakuma, Masatake; Sonoda, Yukio; Kanemoto, Shigeru

    2004-01-01

    Toshiba Corporation constructed e-Toshiba Operating Plant Service (e-TOPS TM ) system and began remote operation and maintenance support service for nuclear power plants. The service put into practice remote operation and maintenance by harmony of information technologies such as internet and mobile, and nuclear power measurement/diagnostic technologies and security techniques. Outline of e-TOPS TM , remote-control service, -inspection system, -diagnostic service and technologies support service are explained. Construction, objects and application effects of e-TOPS TM , remote diagnostic system using image treatment techniques, construction of device record card control system are illustrated. (S.Y.)

  8. Personnel and population exposure regulation questions

    International Nuclear Information System (INIS)

    Nosovskij, A.V.

    2000-01-01

    ICRP Recommendations-1990, Notice 60 was used as a basis for new NRBU-97 norms in Ukraine and also for Russian NRB-96 and reviewed NRB-99. These recommendations caused negative treatment among rather authoritative organizations and individual scientists of France, USA, Russia and other countries. Till 1988, norms NRB-76/87 were operated in Ukraine. ICRP Recommendations-1976, Notice 26 was used under their development, and dosage limits included into them surely provided radiation protection for Nuclear Power Units personnel and population during long-term period. But some leaders being affected by Chernobyl syndrome and radio phobia put strong pressure upon ICRP that resulted in Notice 60 appearance where dosage limits for personnel and population were sufficiently understated without any scientific ground. According to literary sources survey, it is shown that usage of dose-effect non threshold linear dependence concept essentially exaggerates the real danger. According to the concept, principles of regulation the exposure standards are suggested, which considered to be actual as large-scale works on dismantling the reactors and ChNPP Units equipment are expected soon on the phase of their decommissioning and also the conducting of works on Unit 'Shelter' transformation into ecologically safe system

  9. Radiological protection of service and civilian personnel

    International Nuclear Information System (INIS)

    1990-01-01

    Since the United Kingdom's defence nuclear industry was founded in the late 1940s, Service and civilian personnel have been exposed to ionising radiation. During the last forty years, as knowledge about the effects of radiation exposure has grown, concern to ensure adequate protection against exposure has also increased,. As part of our continuing scrutiny of the Ministry of Defence (MoD), we have undertaken a short inquiry to examine MoD's current and future policy and practice on radiological protection. The principal work involving exposure of Service and civilian personnel to significant levels of radiation falls into two discrete areas: the nuclear weapons programme and the nuclear propulsion programme. The nuclear weapons programme involves research, the production of nuclear warheads and their deployment with Her Majesty's Forces. The nuclear propulsion programme involves research, production, operation, refitting and decommissioning of pressurised water reactors as a source of propulsion power in Royal Navy submarines. These two nuclear programmes are not the only sources of ionising radiation within MoD's responsibility: it also arises from research, non-destructive testing and medical applications, most notably conventional radiography. In this Report we have concentrated upon ionising radiation arising from the two defence nuclear programmes. (author)

  10. Pavement maintenance procedures with and without milling materials

    Directory of Open Access Journals (Sweden)

    Rafiqul A. Tarefder

    2016-01-01

    Full Text Available This study evaluates maintenance treatment followed by different Districts of New Mexico Department of Transportation (NMDOT. In addition, two case studies on the use of old pavement materials, called the “millings”, in maintenance projects are reported. Based on this study, it is observed that none of the Districts have a written procedure for maintenance work. Rather Districts rely on the experience of the maintenance crew for conducting maintenance projects. All Districts prefer to use chip seal for maintenance irrespective of distress conditions of the pavements. Patching and crack sealing are usually done before chip sealing to extend the life of the chip seals. Sand seal, scrub seal, and slurry seal projects are not done by District maintenance crews but by outside contractors. It is also observed that all Districts are interested in using millings in maintenance projects and most have already used millings in at least one maintenance project with some success and failure. Most of the Districts have used coarse fraction of millings in chip seal projects successfully. However, they failed to find a proper way to process the fine fractions of millings. Case Study I shows that fine millings can be used to construct thin overlay when mixed with emulsion in pug mill or hot drums. Case Study II concludes that fine millings can be used as fine/sand seal successfully following the same procedure and using the same equipment as chip seal. Keywords: Millings, Maintenance, Emulsion, Rutting, Pug-mill

  11. Trust versus confidence: Microprocessors and personnel monitoring

    International Nuclear Information System (INIS)

    Chiaro, P.J. Jr.

    1993-01-01

    Due to recent technological advances, substantial improvements have been made in personnel contamination monitoring. In all likelihood, these advances will close out the days of manually frisking personnel for radioactive contamination. Unfortunately, as microprocessor-based monitors become more widely used, not only at commercial power reactors but also at government facilities, questions concerning their trustworthiness arise. Algorithms make decisions that were previously made by technicians. Trust is placed not in technicians but in machines. In doing this it is assumed that the machine never misses. Inevitably, this trust drops, due largely to open-quotes false alarms.close quotes This is especially true when monitoring for alpha contamination. What is a open-quotes false alarm?close quotes Do these machines and their algorithms that we put our trust in make mistakes? An analysis was performed on half-body and hand-and-foot monitors at Oak Ridge National Laboratory (ORNL) in order to justify the suggested confidence level used for alarm point determination. Sources used in this analysis had activities approximating ORNL's contamination limits

  12. Trust versus confidence: Microprocessors and personnel monitoring

    International Nuclear Information System (INIS)

    Chiaro, P.J. Jr.

    1993-01-01

    Due to recent technological advances, substantial improvements have been made in personnel contamination monitoring. In all likelihood, these advances will close out the days of manually frisking personnel for radioactive contamination. Unfortunately, as microprocessor-based monitors become more widely used, not only at commercial power reactors but also at government facilities, questions concerning their trustworthiness arise. Algorithms make decisions that were previously made by technicians. Trust is placed not in technicians but in machines. In doing this it is assumed that the machine never misses. Inevitably, this trust drops, due largely to ''false alarms''. This is especially true when monitoring for alpha contamination. What is a ''false alarm''? Do these machines and their algorithms that we put our trust in make mistakes? An analysis was performed on half-body and hand-and-foot monitors at Oak Ridge National Laboratory (ORNL) in order to justify the suggested confidence level used for alarm point determination. Sources used in this analysis had activities approximating ORNL's contamination limits

  13. Trust versus confidence: Microprocessors and personnel monitoring

    International Nuclear Information System (INIS)

    Chiaro, P.J. Jr.

    1994-01-01

    Due to recent technological advances, substantial improvements have been made in personnel contamination monitoring. In all likelihood, these advances will close out the days of manually frisking personnel for radioactive contamination. Unfortunately, as microprocessor-based monitors become more widely used, not only at commercial power reactors but also at government facilities, questions concerning their trustworthiness arise. Algorithms make decisions that were previously made by technicians. Trust is placed not in technicians but in machines. In doing this it is assumed that the machine never misses. Inevitably, this trust drops, due largely to ''false alarms''. This is especially true when monitoring for alpha contamination. What is a ''false alarm''? Do these machines and their algorithms that they put their trust in make mistakes? An analysis was performed on half-body and hand-and-foot monitors at Oak Ridge National Laboratory (ORNL) in order to justify the suggested confidence level used for alarm point determination. Sources used in this analysis had activities approximating ORNL's contamination limits

  14. Maintenance systems and procedures used in a nuclear power station and their relevance to other industries

    International Nuclear Information System (INIS)

    Kirk, R.R.

    1985-01-01

    The maintenance systems and procedures used at the Forsmark Nuclear Power Plant in Sweden can be viewed as a model which maintenance managers in other non-nuclear industries may adapt for their purposes. With the aid of a computerized information system covering the functions of work orders, preventative maintenance, documentation and others, plus a more conventional personnel structure, the result is an efficient, confident and well informed maintenance group. By following the basic design principles of the computerized information system used at the Forsmark Nuclear Power Station plus similar personnel structures, the performance of maintenance teams in non-nuclear manufacturing, processing and other industries could be improved to the standards of those observed

  15. Maintenance facilities, stores and records

    International Nuclear Information System (INIS)

    Fischer, K.

    1986-01-01

    The topics of this report are: on-site or off-site facilities. On-site facilities: workshops and special facilities. KWU's Service Center, a typical off-site supporting facility in Germany, capabilities and activities. A pool for special tools and equipment: devices for plugging of nozzles, for handling of RPU-studs and RPU internals etc. Devices for and management of radiological protection on-site for typical outage work. Spare parts and spare part management on site, typical examples. KWU's centralized spare part pools for components, generators and turbines etc. A computerized system for spare parts storage and maintenance planning. A system for mutual exchange of operational experience with respect to maintenance and repair activities. Systematic evaluation of failures and statistical results. (orig./GL)

  16. Chromatin replication and epigenome maintenance

    DEFF Research Database (Denmark)

    Alabert, Constance; Groth, Anja

    2012-01-01

    Stability and function of eukaryotic genomes are closely linked to chromatin structure and organization. During cell division the entire genome must be accurately replicated and the chromatin landscape reproduced on new DNA. Chromatin and nuclear structure influence where and when DNA replication...... initiates, whereas the replication process itself disrupts chromatin and challenges established patterns of genome regulation. Specialized replication-coupled mechanisms assemble new DNA into chromatin, but epigenome maintenance is a continuous process taking place throughout the cell cycle. If DNA...

  17. Mining Surveillance and Maintenance Dollars

    International Nuclear Information System (INIS)

    MARTINEZ, R.

    2000-01-01

    Accelerating site cleanup to reduce facility risks to the workers, the public and the environment during a time of declining federal budgets represents a significant technical and economic challenge to U.S. Department of Energy (DOE) Operations Offices and their respective contractors. A significant portion of a facility's recurring annual expenses are associated with routine, long-term surveillance and maintenance (S and M) activities. However, ongoing S and M activities do nothing to reduce risks and basically spend money that could be reallocated towards facility deactivation. This paper discusses the background around DOE efforts to reduce surveillance and maintenance costs, one approach used to perform cost reviews, lessons learned from field implementation and what assistance is available to assist DOE sites in performing these evaluations

  18. The maintenance management framework models and methods for complex systems maintenance

    CERN Document Server

    Crespo Márquez, Adolfo

    2010-01-01

    “The Maintenance Management Framework” describes and reviews the concept, process and framework of modern maintenance management of complex systems; concentrating specifically on modern modelling tools (deterministic and empirical) for maintenance planning and scheduling. It will be bought by engineers and professionals involved in maintenance management, maintenance engineering, operations management, quality, etc. as well as graduate students and researchers in this field.

  19. Procedures for maintenance and repairs

    International Nuclear Information System (INIS)

    Pickel, E.

    1981-01-01

    After a general review of the operation experience in the history of more than 12 operating years, the organization in the plant will be shown with special aspect to quality assurance, capacity of the workshops and connected groups as radiation protection, chemical laboratories etc. The number, time intervals and manpower effort for the repeating tests will be discussed. Reasons and examples for back-fitting activities in the plant are given. Besides special repair and maintenance procedures as repair of the steam generators, in-service inspection of the reactor pressure vessel, repair of a feed-water pipe and repair of the core structure in the pressure vessel, the general system to handle maintenance and repair-work in the KWO-plant will be shown. This includes also the detailed planning of the annual refueling and revision of the plant. (orig./RW)

  20. Environmental Assessment. Construction and Maintenance of Wastewater Pipelines and Lift Stations and Installation of Fiber Optic Conduit at Eglin Air Force Base, Florida

    Science.gov (United States)

    2012-06-01

    The wetland on the unnamed tributary of Garnier Creek, upstream of the point of crossing, contains a single individual of the genus Platanthera...Woods And  Maintained ROW  X  X  X  Diospyros  virginiana  Persimmon  Mixed Pine‐Hardwood Forest,  Usually With Longleaf Pine  X  X  X  Eleocharis obtusa

  1. Activities of maintenance and outage

    International Nuclear Information System (INIS)

    Gracia-Orellan, J. M.; Gonzalez, P. L.; Verdu, M. F.; Fernandez, J. A.

    2004-01-01

    Iberinco Nuclear Generation Department have wanted to promote service activities in nuclear power plants for years besides its dedication to engineering activities. for it, in 1997 Nuclear Services Management was created to complement engineering activities and to be able to make an offer for products and turn key services. People involved in this Management have an extensive experience in Services Area, so that all type of maintenance works are promoted, as well other services like dismantling, fallout management and new equipment's for nuclear power plants services. Iberinco's experience in Support Services in Nuclear Power Plants allows to answer effectively to special workers during operation cycle and outages periods. These activities have been made in spanish nuclear power plants and Angra I and II plants, both of them in Brazil. In this area we provide Technical Consulting Management and Supervision to develop the following activities: - Improvement Maintenance Programs based in PSA: Implantation of Maintenance Rule in the plants. - Supervision and Assembly of design modifications in structures, systems and components. - Fulfilment of efficiency tests, inspection and turbo-group modification. - Noise and vibrations analysis. - Valves and rotative equipment calculations and diagnosis tests. Iberinco develop these outage activities itself or as contractors coordinator under its management. A lot of them have been working with Iberinco for many years and have a great experience in the Service Area they are developing. In this article, the main outage activities developed for Iberinco are detailed. (Author)

  2. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2000-01-01

    In 1999 the Nuclear Regulatory Authority of the Slovak Republic (UJD) focused on the overall training system and on developing programmes for individual categories for NPP V-1 Bohunice, NPP V-2 Bohunice, NPP Mochovce and SE-VYZ. The fundamental theoretical and periodical training for both Bohunice and Mochovce NPPs personnel, simulator training for NPP Bohunice, and periodical simulator training for Bohunice personnel is carried out by the VUJE Training center in Trnava, whereas the simulator training and periodical training for NPP Mochovce is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues, a certificate on special professional skills of selected staff of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: (a)Shift manager for scientific start up with the right of manipulation; (b) Shift supervisor; (c) Unit supervisor; (d) Primary circuit operator; (e) Secondary circuit operator; (f) Reactor physicist; (g) Shift manager for scientific start up without the right of manipulation. Examination of selected personnel is described. Last year the examining committee held twelve session for oral theoretical examination. The number of licenses issued in 1999 and the total number of valid licenses is given.Conclusions from inspections carried out by UJD and inspections and tests carried out by the NPP operators in 1999, as well as results from operation and start up of nuclear units confirm that the standard of professional skills of the staff at nuclear installations a high standard of operational safety is being achieved on a permanent basis. Increasing the qualification of UJD staff was done in a form of training and courses scheduled in the plan of training for the staff for 1999. These training, composed of specialized qualification study, functional study, as well as study aimed at maintaining qualification. Training courses organized

  3. Maintenance and fabrication of nuclear electronic equipment

    International Nuclear Information System (INIS)

    Hong, Seok Boong; Chung, Chong Eun; Hwang, In Koo; Koo, In Soo; Park, Bum; Kim, Soo Hee; Lee, Seong Joo; Kim, Min Seok; Choi, Wha Lim

    2011-12-01

    - process equipment at PIEF, Chemical Analysis Team and RWFTF have been calibrated. - The electronic equipment and radiation equipment at RWTF and PIEF have been prepared. - Development and installation of integrated RMS software for Hanaro Cold Neutron Laboratory Building(CNLB) RMS, and development and performance upgrade of a portal monitor for CNLB. - Performance test of the Hardware/Software of digital unit controller has been performed, and functional upgrade of the Hardware/Software of stimulator for SMART MMIS performance test facility has also been performed. - A controller of high voltage power supply for a small electron beam generator and a controller for razer pinning and a remote monitoring apparatus of cathode power supply for a 0.2 Mev. small electron beam generator have been designed and fabricated. - Database construction for effective maintenance for the process equipment and radiation instruments are designed and constructed

  4. Bulk Fuel Storage Requirements for Maintenance, Repair, and Environmental Projects at Fort Hood, Texas

    National Research Council Canada - National Science Library

    Carros, Deborah

    2000-01-01

    This report is one in a series that addresses the accuracy and reliability of maintenance, repair, environmental, and construction requirements for bulk fuel storage and delivery systems infrastructure...

  5. Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

    International Nuclear Information System (INIS)

    Spampinato, P.T.; Tabor, M.A.

    1988-01-01

    Remote maintenance systems requirements are being developed to provide design guidelines for machine components, to define maintenance interfaces, and to quantify maintenance equipment and procedures needed

  6. Nuclear manpower planning and personnel training

    International Nuclear Information System (INIS)

    Chen, J.H.

    1984-01-01

    Taiwan Power Company has established a nuclear manpower program to identify human resources, selection and recruitment of entry level engineers and technicians of Nuclear Energy Group. The methodology to estimate the future nuclear manpower demand of Taipower has been clearly described in this article. Also, the manpower program is being used as the bases for nuclear training program development. For safe, reliable and efficient operation of nuclear power plants, Taipower has established a systematic training program for nuclear power stations and headquarter personnel. The training program has been implemented in three stages with different patterns of training program. The first stage of nuclear training before 1975 was completed successfully. The second stage of nuclear training currently conducted since 1975 enlarges domestic training capability. The third stage of nuclear training with a long term training program is now under a systematic and compositive development effort

  7. Radiation protection and safety guide no. GRPB-G-1: qualification and certification of radiation protection personnel

    International Nuclear Information System (INIS)

    Schandorf, C.; Darko, O.; Yeboah, J.; Osei, E.K.; Asiamah, S.D.

    1995-01-01

    A number of accidents with radiation sources are invariably due to human factors. The achievement and maintenance of proficiency in protection and safety in working with radiation devices is a necessary prerequisite. This guide specifies the national scheme and minimum requirements for qualification and certification of radiation protection personnel. The objective is to ensure adequate level of skilled personnel by continuous upgrading of knowledge and skill of personnel. The following sectors are covered by this guide: medicine, industry, research and training, nuclear facility operations, miscellaneous activities

  8. Operation and Maintenance of Water Pollution Control Facilities: A WPCF White Paper.

    Science.gov (United States)

    Hill, William R.; And Others

    1979-01-01

    Presented are the recommendations of the Water Pollution Control Federation for operation and maintenance consideration during the planning design, construction, and operation of wastewater treatment facilities. (CS)

  9. Training of system engineers for Salem and Hope Creek nuclear power plant personnel

    International Nuclear Information System (INIS)

    Ketcham, S.

    1988-01-01

    To establish and maintain a high level of plant reliability at a nuclear power station, a conscientious, integrated, day-to-day effort is required from operations and maintenance personnel, as well as the engineering support groups. The catalyst and focus to ensure that this occurs within the Public Service Electric and Gas Company system is the station system engineer. These engineers have total responsibility for their designated systems. For these individuals to communicate with the operations and maintenance departments effectively, they must have an understanding of the design and operation of each and every system and the effect they may have on the overall plant. (author)

  10. Hand-held personnel and vehicle monitors

    International Nuclear Information System (INIS)

    Kunz, W.E.; Chambers, W.H.; Henry, C.N.; France, S.W.; Millegan, D.R.; Hastings, R.D.; Worth, G.M.

    1976-05-01

    A light, rugged monitor has been developed for special nuclear materials (SNM) searches at material-access and protection-area exits. This monitor accepts gamma-ray pulses from a NaI(Tl) detector, integrates for a preset counting interval (typically 0.3 s), and produces an audible alarm whenever the counts in the interval exceed the trip level that is a preset multiple of the stored background count. Because the monitor is silent except when the alarm is operating, personnel with little special training can conduct more effective searches in a noisy and distracting environment than they can with conventional audible monitoring of individual radiation counts. The monitor is also more sensitive than conventional monitors that provide audible indication of the count rate

  11. DOE-EM-45 Packaging Operations And Maintenance Course

    International Nuclear Information System (INIS)

    Watkins, R.; England, J.

    2010-01-01

    Savannah River National Laboratory - Savannah River Packaging Technology (SRNL-SRPT) delivered the inaugural offering of the Packaging Operations and Maintenance Course for DOE-EM-45's Packaging Certification Program (PCP) at the University of South Carolina Aiken on September 1 and 2, 2009. Twenty-nine students registered, attended, and completed this training. The DOE-EM-45 Packaging Certification Program (PCP) sponsored the presentation of a new training course, Packaging Maintenance and Operations, on September 1-2, 2009 at the University of South Carolina Aiken (USC-Aiken) campus in Aiken, SC. The premier offering of the course was developed and presented by the Savannah River National Laboratory, and attended by twenty-nine students across the DOE, NNSA and private industry. This training informed package users of the requirements associated with handling shipping containers at a facility (user) level and provided a basic overview of the requirements typically outlined in Safety Analysis Report for Packaging (SARP) Chapters 1, 7, and 8. The course taught packaging personnel about the regulatory nature of SARPs to help reduce associated and often costly packaging errors. Some of the topics covered were package contents, loading, unloading, storage, torque requirements, maintaining records, how to handle abnormal conditions, lessons learned, leakage testing (including demonstration), and replacement parts. The target audience for this course was facility operations personnel, facility maintenance personnel, and field quality assurance personnel who are directly involved in the handling of shipping containers. The training also aimed at writers of SARP Chapters 1, 7, and 8, package designers, and anyone else involved in radioactive material packaging and transportation safety. Student feedback and critiques of the training were very positive. SRNL will offer the course again at USC Aiken in September 2010.

  12. Reliability-based maintenance evaluations and standard preventive maintenance programs

    International Nuclear Information System (INIS)

    Varno, M.; McKinley, M.

    1993-01-01

    Due to recent issuance of 10CFR50.65, the U.S. Nuclear Regulatory Commission maintenance rule (Rule), and the open-quotes Industry Guideline for Monitoring the Effectiveness of Maintenance at Nuclear Power Plantsclose quotes prepared by the Nuclear Management and Resources Council, many utilities are undertaking review or evaluation of current preventive maintenance (PM) programs. Although PM optimization and documentation are not specifically required by the Rule, an appropriate and effective PM program (PMP) will be the cornerstone of the successful and cost-effective implementation of the Rule. Currently, a project is being conducted at the Vermont Yankee Nuclear Power Station (VYNPS) in conjunction with Quadrex Energy Services to evaluate, optimize, and document the PMP. The project began in March 1993 and is scheduled for completion in mid-1995. The initial scope for the project is the evaluation of those structures, systems, and components that are within the scope of the Rule. Because of the number of systems to be evaluated (∼50), the desired completion schedule, and cost considerations, a streamlined approach to PM optimization and documentation is being utilized

  13. Construction et Maintenance des Entrepôts de Données Hétérogènes

    Directory of Open Access Journals (Sweden)

    Faouzi Boufarès

    2007-06-01

    Full Text Available This work describes the construction of a data warehouse by the integration of heterogeneous relational and object-relational data. In fact, developing intelligent tools for the integration of information extracted from multiple heterogeneous sources is a challenging issue to effectively exploit the numerous sources available in global information systems. Due to the heterogeneity of the sources, various languages of interrogation and different data models are used for the warehouses. Thus the construction of the latter can be made in several manners. Our work is based on the extraction of the inter-schema relationships between the sources. Related to this, a global schema is generated and the views of the data warehouse are constructed. A maintenance procedure is also presented to mitigate the insufficiency of Oracle.

  14. Requirements on qualification, competence and sufficient number of personnel for NPP operation

    International Nuclear Information System (INIS)

    Simon, M.

    2004-01-01

    The safe operation of NPPs presupposes qualified personnel on site in sufficient numbers. While the acquisition and preservation of technical expertise and the qualification of the shift personnel and other staff is well regulated by regulatory guidelines in Germany, there is a lack of such regulations with the exception for shift personnel - for the minimum number of technical personnel required for safe operation of a NPP. By order of the BMU, an attempt was made with this study to work out the requirements for qualification, competence and number of personnel to be maintained at the plant, representing the minimum requirements for safe operation of a NPP. The scope of the project was restricted to requirements for technical plant personnel. The aim was to work out requirements which would be as independent as possible of the existing organisation in a particular power plant. This study therefore does not assume a given organisational structure but was rather more oriented on the work processes in a NPP which are the basis for planning and performing routine work in the plant. For the study a work process model of typical tasks in a NPP had to be developed. Then, the tasks to be performed within the so defined work processes were described (task profiles) on the basis of existing manuals for plant organisation. From these task profiles such tasks were defined or selected which shall not be delegated to external personnel for specific reasons, and which were called vital competences. To keep these vital competences at the plant, an assessment and/or calculation of the necessary number of plant technical personnel was made using the task profiles for responsible personnel, but also by the evaluation of thousands of work orders for maintenance personnel. On the basis of these data, a proposal was made for the minimal number of technical personnel which is necessary to operate a NPP unit safely. Beside of this number, general criteria were developed which should be

  15. Track 5: safety in engineering, construction, operations, and maintenance. Reactor physics design, validation, and operating experience. 5. A Negative Reactivity Feedback Device for Actinide Burner Cores

    International Nuclear Information System (INIS)

    Driscoll, M.J.; Hejzlar, P.

    2001-01-01

    Lead-bismuth eutectic (LBE) cooled reactors are of considerable interest because they may be useful for destruction of actinides in a cost-effective manner, particularly cores fueled predominantly with minor actinides, which gain reactivity with burnup. However, they also pose several design challenges: 1. a small (and perhaps even slightly positive) Doppler feedback; 2. small effective delayed neutron yield; 3. a small negative feedback from axial fuel expansion; 4. positive coolant void and temperature coefficients for conventional designs. This has motivated a search for palliative measures, leading to conceptualization of the reactivity feedback device (RFD). The RFD consists of an in-core flask containing helium gas, tungsten wool, and a small reservoir of LBE that communicates with vertical tubes housing neutron absorber floats. The upper part of these guide tubes contains helium gas that is vented into a separate, cooler ex-core helium gas plenum. The principle of operation is as follows: 1. The tungsten wool, hence the helium gas in the in-core plenum, is heated by gammas and loses heat to the walls by convection and conduction (radiation is feeble for monatomic gases and, in any event, intercepted by the tungsten wool). An energy balance determines the gas temperature, hence, pressure, which is 10 atm here. The energy loss rate can be adjusted by using xenon or a gas mixture in place of helium. The tungsten wool mass, which is 1 vol% wool here, can also be increased to increase gamma heating and further retard convection; alternatively, a Dewar flask could be used in place of the additional wool. 2. An increase in core power causes a virtually instantaneous increase in gamma flux, hence, gas heatup: The thermal time constant of the tungsten filaments and their surrounding gas film is ∼40 μs. 3. The increased gas temperature is associated with an increased gas pressure, which forces more liquid metal into the float guide tubes: LBE will rise ∼100 cm

  16. Development of preventive maintenance procedures and schedules

    International Nuclear Information System (INIS)

    Schlenker, H.V.; Hammel, J.

    1977-01-01

    An outline of the procedures and schedules developed for preventive maintenance in power stations within the Rheinisch-Westfaelisches Elektrizitaetswerk (RWE) is presented. After an introduction of maintenance in general the different kinds of preventive maintenance activities are described. This includes also the prerequisite identification systems. The aims of preventive maintenance and the measures are explained that have to be taken, if these aims are to be achieved. A number of examples from actual practice are cited. (orig.) [de

  17. Demands on power plant personnel and personnel organisation from the authorities' point of view

    International Nuclear Information System (INIS)

    Pfaffelhuber, J.K.

    1980-01-01

    A survey is given about those essential aspects of qualification and organization of personnel in nuclear power plants, that are already regulated in laws or guidelines. The considerations of the BMI concerning further developments of these requirements are outlined. (orig.) [de

  18. Personality, personnel selection, and job performance

    OpenAIRE

    Linden, Dimitri; Pelt, Dirk; Dunkel, Curtis; Born, Marise

    2017-01-01

    markdownabstractJob Performance: The term job performance can either refer to the objective or subjective outcomes one achieves in a specific job (e.g., the profit of a sales persons, the number of publications of a scientist, the number of successful operations of a surgeon) or to work-related activities (e.g., writing an article, conducting specific surgical acts). In the majority of research on this topic, job performance as an outcome is used. Personnel selection: Personnel selection refe...

  19. Military Construction: Process and Outcomes

    Science.gov (United States)

    2016-12-14

    barracks, schools, hospitals, child development centers, and other facilities needed to support U.S. military forces at home and overseas. This military...and programming into the President’s budget could take three or more years. Furthermore, it is important to note that only those projects that have...travel, fuel, minor construction projects of $1M or less, training and education , and depot maintenance, and base operations support. O&M

  20. Transactionalism and the Coordinator of Pupil Personnel Services

    Science.gov (United States)

    Kornick, Joseph

    1969-01-01

    Uses Getzels and Guba's view of social behavior as theoretical framework for discussion. Points out importance of bureaucratic structure and personnel functions as factors affecting coordinator's role. (CJ)

  1. Status of maintenance in the US nuclear power industry 1985. Volume 2. Description of programs and practices

    International Nuclear Information System (INIS)

    1986-06-01

    This report documents a review of the status of maintenance programs and practices in the US commercial nuclear power industry. The purpose of this review is to establish a baselines reference for evaluating the effectiveness of future industry activities in maintenance. Two methods used to collect progammatic data. First, a Maintenance Review Protocol was used during site visits to eight selected power plants to collect in-depth maintenance program information. Second, a Maintenance Questionnaire was filled out by NRC Resident Inspectors regarding maintenance programs at their plant. The protocol and questionnaire contained items regarding five broad categories of maintenance: (1) organization and administration, (2) facilities and equipment, (3) procedures, (4) personnel, and (5) work control. The study found that there is wide variability in industry maintenance programs. However, the industry is currently undergoing changes in maintenance practices, and adherence to INPO and NUMARC guidance in maintenance may bring about more systematically developed program practices

  2. A system for measuring and processing personnel dosimetric data

    International Nuclear Information System (INIS)

    Neetzel, C.R.; Rochetti, Luis

    1981-01-01

    An operative system for the measurement and on-line processing of personnel dosimetry data is described. The aim is to organize and rationalize the work involved in a personnel dosimetry service. The method considers the application to other areas of radiation protection, as well as the connection and exchange of files among the different personnel monitoring groups. The system can be interfaced with different computers (M.E.L.) [es

  3. Work stress and health effects among university personnel.

    Science.gov (United States)

    Donders, N C G M; van der Gulden, J W J; Furer, J W; Tax, B; Roscam Abbing, E W

    2003-10-01

    (1) To investigate the contribution of job characteristics and personal characteristics to the explanation of health effects among university personnel; (2) to investigate the differences between scientific personnel (SP) and non-scientific personnel (NSP); (3) to investigate whether health effects occurred one after another. The well being at work of employees at a Dutch university (n=2,522) was investigated by means of a questionnaire. A model was constructed in which several job and personal characteristics were set out against health effects. The latter were assumed to occur in phases: decreased "job satisfaction" as an early effect, followed by increased "tension" and "emotional exhaustion", and possibly also by increased "perceived health complaints". The contribution of job and personal characteristics to the explanation of health effects was investigated by means of linear regression analysis, with separate analyses for SP and NSP. Positive job characteristics, especially professional expertise and work variety, contributed to the explanation of "job satisfaction". The major contributors to "tension" and "emotional exhaustion" were negative characteristics, such as work pressure. Besides the negative aspects, the major contributors to the explanation of "perceived health complaints" were sex, age and other health effects. In NSP, social support contributed to the explanation of "tension" and "emotional exhaustion", but not in SP. The explained variance of "job satisfaction" by the positive job characteristics in NSP was much higher than that in SP. To investigate whether health effects occurred one after another, we considered explained variance. Explained variance in "job satisfaction" was much higher than in "perceived health complaints". "Emotional exhaustion" and "tension" were in between. Contrary to expectations, decision latitude and social support played only minor roles. Also, the differences between SP and NSP were smaller than expected. As

  4. Maintenance and Revitalization of Gallo

    DEFF Research Database (Denmark)

    Nolan, J. Shaun

    2018-01-01

    promotion organizations comprising teachers, linguists, enthusiasts, and activists are working hard at a local and regional level to ensure that there is a greater awareness of the existence of this language variety and to foster an appreciation of the importance of its maintenance and revitalization....... Whether these efforts will help Gallo become more used in eastern Brittany’s everyday sociolinguistic landscape remains to be seen. However, Gallo promotional organizations appear to be establishing the symbolic and cultural value of Gallo as part of Brittany’s languages, and are thereby solidifying...

  5. Peace maintenance and political messages

    DEFF Research Database (Denmark)

    McAtackney, Laura

    2011-01-01

    The role of wall murals – as both territorial markers and as a means of maintaining and reinforcing identity – has been a frequent subject of study as a way of understanding the recent conflict in Northern Ireland, euphemistically known as ‘the Troubles’ (c. 1969–c. 1998). Whilst the heightened p......-essentializing their existence. It is suggested that there is a need to contextualize and consider the current and potential role of walls in the maintenance of peace and facilitating a ‘new’ Northern Ireland....

  6. An analysis of generalised heuristics for vehicle routing and personnel rostering problems

    OpenAIRE

    Mustafa Misir; Pieter Smet; Greet Vanden Berghe

    2015-01-01

    The present study investigates the performance of heuristics while solving problems with routing and rostering characteristics. The target problems include scheduling and routing home care, security and maintenance personnel. In analysing the behaviour of the heuristics and determining the requirements for solving the aforementioned problems, the winning hyper-heuristic from the first International Cross-domain Heuristic Search Challenge (CHeSC 2011) is employed. The completely new applicatio...

  7. Chapter 9. Personnel qualification and training

    International Nuclear Information System (INIS)

    2001-01-01

    The overall training system and the development of projects for training of all categories of NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce staff were the subject of Nuclear Regulatory Authority of the Slovak Republic (UJD) attention. During 2000, the following inspections were carried out on nuclear personnel training: (a) NPP Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff ; (b) NPP Mochovce: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; an inspection focused on verifying the simulator aided training; an inspection focused on checking the preparedness of NPP Mochovce operation and technical personnel for NPP Mochovce Unit 2 operation; (c) Technology for treatment and conditioning of radioactive waste Bohunice (BSC): an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff; VUJE Trnava: verification of technical equipment and professional skills of VUJE Trnava staff and tasks arising out of the 'Authorisation on nuclear installation staff training'. Examinations of selected personnel were scheduled according to the plan of examining committee meetings. For each examined person written tests are generated by the computer from the database of test questions at the Training Centre of VUJE Trnava for individual positions - categories of selected staff of NPP V-1 and NPP V-2 Bohunice and NPP Mochovce so that the examination questions both in written and oral part equally cover individual facilities and regimes of operation of NPP. The database is continuously updated, thereby containing new questions resulting from the recent changes carried out at NPPs. A part of the examination in case of promotion to a higher position is the practical part, which is conducted under

  8. FY 2000 report on the results of the regional consortium R and D project - Regional consortium R and D. Third year report. R and D of the transversal maintenance technology; 2000 nendo chiiki consortium kenkyu kaihatsu jigyo - chiiki consortium kenkyu kaihatsu. Odanteki maintenance gijutsu no kenkyu kaihatsu (dai 3 nendo) seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    For the purpose of eliminating bad effects of the maintenance/management of equipment/facilities of plants which are made separately and of heightening efficiency of work and improving technology, persons in charge of maintenance/management, persons requesting maintenance/management and official research institutes proceeded as one with the construction of a system doing maintenance/management work. Concretely, three parties cooperated in integration and enhancement of element technologies such as inspection/diagnosis and arrangement/repair and developed the maintenance/management system (maintenance center) which does not specify objects. Based on this system, development was made of the network connecting between the center and facilities, diagnosis car, and multi-functional repair car. Studies were made on the following three. As to the system development, conducted were the development of a deterioration mode prediction system, basic structuring of a remote maintenance network, and making of fatigue/corrosion/abrasion database. Concerning the tool development, technology to foresee damages on the static portion such as piping, etc. were developed. In the study of field application, conducted were analysis of maintenance flow, development of retrieval system of equipment parts/personnel/operation procedures and multi-functional repair car, etc. (NEDO)

  9. Maintenance philosophy and program at Cernavoda NPP

    International Nuclear Information System (INIS)

    Bobos, M.; Enciu, G.

    1994-01-01

    Maintenance plays a key role in ensuring safe and reliable operation. An effective maintenance program should ensure that installed equipment operates when needed and the equipment malfunctions or deficiencies are corrected in time and rarely recur. Maintenance includes not only the activities traditionally associated with identifying or correcting current or potential equipment deficiencies but also extends to supporting technical functions for the conduct of these activities (for example, engineering, technical support, chemistry control, radiological protection, industrial safety and training). The maintenance management program should clearly define the relationship among these supporting groups as it is related to overall plant maintenance and promotes the concept of a successful integrated team effort. (Author)

  10. The construction of power grid operation index system considering the risk of maintenance

    Science.gov (United States)

    Tang, Jihong; Wang, Canlin; Jiang, Xinfan; Ye, Jianhui; Pan, Feilai

    2018-02-01

    In recent years, large-scale blackout occurred at home and abroad caused widespread concern about the operation of the grid in the world, and the maintenance risk is an important indicator of grid safety. The barrier operation of the circuit breaker exists in the process of overhaul of the power grid. The operation of the different barrier is of great significance to the change of the power flow, thus affecting the safe operation of the system. Most of the grid operating status evaluation index system did not consider the risk of maintenance, to this end, this paper from the security, economy, quality and cleanliness of the four angles, build the power grid operation index system considering the risk of maintenance.

  11. Design of Mobile Operation and Maintenance System Based on Power GIS and GPS

    Directory of Open Access Journals (Sweden)

    Jing TAO

    2017-01-01

    Full Text Available In order to solve the low efficiency of operation and maintenance and the problems of management coordination caused by the coexistence of off-line operation and maintenance and multi system coexistence in current power telecommunication operation and maintenance, this paper proposes a mobile operation and maintenance system based on power GIS and GPS location technology. The system is based on the C/S architecture, and the mobile operation and maintenance terminal is connected with the operation and maintenance management terminal through wireless and wired network. In addition to meeting basic business requirements, the system integrates power GIS functions to visually demonstrate communication resources, personnel, and failures. The staff can use the wireless mobile terminal which integrated GPS module for to operate and maintain, and can locate accurately in real time.

  12. Construction and maintenance of SUNY facilities at the National Synchrotron Light Source. Progress report, 1 July 1983-1 July 1984. Final report

    International Nuclear Information System (INIS)

    Bigeleisen, J.

    1984-01-01

    Research reported includes beamline facilities, X-21 beamline update, SUNY-PRT participation in the design and commissioning of the CHESS crystallography facility, surface physics, material and structure studies using EXAFS, x-ray standing wave studies of surfaces and interfaces, and surface diffraction of adsorbed polyatomic molecules

  13. Waterproofing with polymeric geo synthetic barriers (GBR-P) in the manual for the design, construction, management and maintenance of reservoirs; La impermeabilizacion con barreras geosinteticas polimericas (GBR-P) en el manual para el diseno, construccion, explotacion y mantenimiento de balsas

    Energy Technology Data Exchange (ETDEWEB)

    Blanco, M.; Cea, J. C.; Garcia, F.; Sanchez, F. J.; Castillo, F.; Mora, J.; Crespo, M. A.

    2010-07-01

    This article presents a part of Manual for the Design, Construction, Management and Maintenance of Reservoirs relative to waterproofing with Polymeric Geo synthetic Barriers (GBR-P). the nature materials of geo membranes is studied also theirs characteristics and specifications. (Author) 26 refs.

  14. Operation and maintenance in Genkai PWR Plant

    International Nuclear Information System (INIS)

    Ohta, Shojiro

    1984-01-01

    The No.1 PWR plant with 559 MW capacity in the Genkai Nuclear Power Station, Kyushu Electric Power Co., Inc., required about 115 days for the regular inspection in fiscal 1982 and thereafter, although more maintenance work was done. But No.2 plant of the same type required not more than 80 days. In most cases, the period of one operation cycle was from 10 to 12 months, but in the third operation cycle of No.2 plant, it is expected to be 13 months. The capacity ratio of the whole power station was 75.2% at the end of fiscal 1983. These operational records all exceeded the Japanese average. The plants are two-loop Westinghouse type PWRs, and No.1 plant started the commercial operation of anti h and the increment of P 0 + . (author) apacity ratio of No.1 plant was 71.6%, and that of No.2 plant was 85.5%. The intergranular attack on steam generator tubes was found first in the fifth regular inspection, and also in the sixth and seventh inspections, and the faulty tubes were plugged. The prevention of its spread is the largest problem. The in-service quality assurance activity, the personnel training program and the effort of upgrading the plant availability are reported. (Kako, I.)

  15. Handbook for the design, construction and maintenance of mine haulage roads. Manual para el diseno, construccion y mantenimiento de pista mineras

    Energy Technology Data Exchange (ETDEWEB)

    Ayala Carcedo, F J; Ortiz, D U.F.P.; Lopez, J C; Rodriguez Ortiz, J M; Kraemer, H C; Val, M M.A.D.

    1986-01-01

    The publication gives some easy guide-lines for the design and execution of surface mine roads, and their auxiliary elements, within the technical possibilities and equipment normally available in mining operations. A methodology for the mining haulage is proposed, taking into consideration the geometric and functional conditions of the surface mine haulage road and the vehicles used. 25 refs., 58 figs., 31 tabs., 10 photos.

  16. Personnel monitoring

    International Nuclear Information System (INIS)

    1965-01-01

    This film stresses the need for personnel monitoring in work areas where there is a hazard of exposure to radiation. It illustrates the use of personnel monitoring devices (specially the film dosimeter), the assessment of exposure to radiation and the detailed recording of the results on personnel filing cards

  17. Personnel monitoring

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1966-12-31

    This film stresses the need for personnel monitoring in work areas where there is a hazard of exposure to radiation. It illustrates the use of personnel monitoring devices (specially the film dosimeter), the assessment of exposure to radiation and the detailed recording of the results on personnel filing cards

  18. Construction and maintenance of SUNY facilities at the National Synchrotron Light Source. Progress report, 1 October 1981-1 July 1982

    International Nuclear Information System (INIS)

    Bigeleisen, J.

    1982-01-01

    Development of the SUNY beam line at the National Synchrotron Light Source is described. The line now includes monochromator/mirror optics with tandem arrangement of experiments. The beamline computer system is now working with CAMAC data acquisition, and a four-circle diffractometer, a small-angle-scattering bench, and a fluorescence EXAFS apparatus should be ready soon

  19. Construction and maintenance of SUNY facilities at the National Synchrotron Light Source. Progress report, 1 July 1982-1 July 1983

    International Nuclear Information System (INIS)

    Bigeleisen, J.

    1983-01-01

    Experimental facilities on the X-21 beam line at the National Synchrotron Light Source are described, and synchrotron radiation experiments performed by PRT members are discussed. The report includes a description of the beam line development stages and the experimental equipment

  20. BIM and GIS for low-disturbance construction

    NARCIS (Netherlands)

    Sebastian, R.; Böhms, H.M.; Helm, P.W. van den

    2013-01-01

    Construction and maintenance activities of bridges often bring negative impacts to the urban environment in terms of disturbance, traffic jams and disruptions, noise, dust, and air pollution. Lack of coordination between the stakeholders in strategic, tactical and operational construction planning

  1. X-ray and nuclear radiation facilities: personnel safety features

    International Nuclear Information System (INIS)

    Mason, W.J.; Pipes, E.W.; Rucker, T.R.; Smith, D.N.; West, C.M.

    1976-10-01

    The Oak Ridge Y-12 Plant is a research and production installation. The nature and versatility of this work require the use of a large number and variety of x-ray and radiographic sources for nondestructive testing and material analyses. Presently, there are over 80 x-ray generators in the plant, which range in size from small, portable units which operate at a less than 50 kilovolts potential and 0.1 milliampere current to an electron linear accelerator which operates at 12-million electron volts and produces a radiation beam of such intensity that it could deliver a lethal dose to man in a fraction of a minute. There are also almost 50 gamma and neutron sources in use in the plant. These units range in size from a few millicuries to several hundred curies. Although the radiation safety at each of these facilities was considered adequate, the administrative and maintenance procedures became unduly complicated. Accordingly, engineering standards and uniform operating procedures were considered necessary to alleviate these complications and, in so doing, provide an improved measure of radiation safety. Development and implementation of these standards are described and the general philosophy and approach to these standards are outlined. Use of a matrix (type of installation versus radiation safety feature) to facilitate equipment classification and personnel safety feature requirements is presented. Included is a set of the standards showing formats, matrices, etc., and the detailed standards for each safety feature

  2. Selection, qualification and training of personnel for nuclear power plants

    International Nuclear Information System (INIS)

    Anon.

    1981-01-01

    This standard provides criteria for the selection, qualification and training of personnel for stationary nuclear power plants. Qualifications, responsibilities, and training of personnel in operating and support organizations appropriate for the safe and efficient operation of nuclear power plants are addressed

  3. Cross-Cultural Adaptation and Validation of the Attitudes Toward Suicide Questionnaire Among Healthcare personnel in Malaysia.

    Science.gov (United States)

    Siau, Ching Sin; Wee, Lei-Hum; Ibrahim, Norhayati; Visvalingam, Uma; Wahab, Suzaily

    2017-01-01

    Understanding attitudes toward suicide, especially among healthcare personnel, is an important step in both suicide prevention and treatment. We document the adaptation process and establish the validity and reliability of the Attitudes Toward Suicide (ATTS) questionnaire among 262 healthcare personnel in 2 major public hospitals in the Klang Valley, Malaysia. The findings indicate that healthcare personnel in Malaysia have unique constructs on suicide attitude, compared with the original study on a Western European sample. The adapted Malay ATTS questionnaire demonstrates adequate reliability and validity for use among healthcare personnel in Malaysia.

  4. Design and evaluation of augmented reality for nuclear power plant maintenance based on Cognitive activity analysis

    International Nuclear Information System (INIS)

    Koo, Jwa Jin

    2008-02-01

    The goals of maintenance in nuclear power plants (NPPs) are to reduce the number of plant shutdowns, to decrease the shutdown time, to minimize the maintenance costs, and to improve nuclear safety. Furthermore, it is difficult for maintenance personnel to conduct work in NPPs due to the complexity of NPPs, safety issues and time constraints. Human errors should be prevented to achieve maintenance goals in NPPs. Therefore, it is necessary to improve working conditions by introducing support systems. Augmented Reality (AR) has the potential to assist with maintenance tasks and make maintenance personnel concentrate on the tasks, which will then the reduced human error and improve human performance. The working procedure for AR systems was designed based on the characteristics of cognitive activity, and an experiment was conducted to estimate the effectiveness of AR. The results indicated that a well-designed working procedure for AR systems was more effective than a conventional paper-based working procedure. In addition, participants made fewer errors using the designed working procedure. AR systems as maintenance support systems are beneficial technology that can improve maintenance performance by reducing cognitive loads and unnecessary movements. An AR application can be attractive and effective at supporting maintenance task

  5. Work performed by the nuclear industry - personnel structure and personnel requirement

    International Nuclear Information System (INIS)

    Simon, M.

    1984-01-01

    The development of the nuclear industry in the Federal Republic of Germany can be phased as follows: Phase 1 (1956-1968): initial stage, Phase 2 (1968-1975): expansion of the business volume, Phase 3 (1975-1982): decreasing business volume, more conditions and technical requirements, Phase 4 (after 1982): consolidation of technologies and project management. Accordingly, the requirements made on the personnel employed in the nuclear industry had to change. Between 1982 and today, there has been a decrease of personnel employed in nuclear industry to about 35.000. This decrease is mainly due to the supplying industry. Adding to this figure the number of people employed in research centres, authorities and experts, there are over 40.000 nuclear technology jobs, a figure which, taking into account indirect employment effect, could be in the range of 100.000 to 150.000. (orig./HSCH) [de

  6. Trends in Spending by the Department of Defense for Operation and Maintenance

    Science.gov (United States)

    2017-01-01

    funding across DoD has occurred at the ime that the number of military personnel er stayed relatively flat or fallen. As a result, spending for each... military personnel and their families, see Congressional Budget Office, Approaches to Reducing Federal Spending on Military Health Care (January...MAINTENANCE BETWEEN 1980 AND 2015 TRENDS IN SPENDING BY ibit 1. D’s Base Budget by Type of Appropriation, 1980 to 2015 ions of 2015 Dollars Military Personnela

  7. New Employee Orientation, Division of Personnel and Labor Relations,

    Science.gov (United States)

    understanding work rules and procedures, provide you with the resources you need, as well as guide you through Employee Training Exit Survey HR Forms New Employee Orientation For Admin Staff Classification Form Packets Personnel Memoranda Personnel Rules Policies and Procedures Recruitment Services Reports Sections Director's

  8. 7 CFR 56.77 - Health and hygiene of personnel.

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Health and hygiene of personnel. 56.77 Section 56.77 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards... EGGS Grading of Shell Eggs Facility Requirements § 56.77 Health and hygiene of personnel. (a) No person...

  9. Health matters in hiring and retaining personnel

    NARCIS (Netherlands)

    Houtman, I.L.D.

    2014-01-01

    Health is the most important issue when an employer is deciding whether to hire a worker, according to a new study from the Netherlands. The research looked at the results of a ‘vignette’ study on employer preferences when hiring or retaining personnel. It also showed that when an employer is

  10. Chapter No.8. Personnel qualification and training

    International Nuclear Information System (INIS)

    2002-01-01

    The overall training system and the development projects of training the staff of all categories from NPP V-1, NPP V-2 Bohunice, SE-VYZ and NPP Mochovce were the subject of UJD's attention. During 2001 following inspections were carried out on nuclear personnel training: - PP's Bohunice: an inspection focused on compliance with requirements for staff qualifications and compliance with the prescribed training of Bohunice plant staff; - Mochovce NPP: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of NPP Mochovce staff; - SE-VYZ: an inspection focused on compliance with the requirements for staff qualifications and compliance with the prescribed training of SE-VYZ staff. Training the staff of the NPP's Bohunice: - The fundamental and periodical theoretical training as sure as the fundamental and periodical simulator training is carried out by the VUJE Training centre in Trnava. - The fundamental practical training in the workplace and training for the change work- rank is carried at Bohunice plant. Training of the staff of the NPP Mochovce: - The fundamental and periodical theoretical training is carried out by the VUJE Training centre in Trnava. The fundamental practical training in the workplace and training for the change work- rank as well as the fundamental and periodical simulator training is carried at Mochovce plant. Based on a successful passing of examination before the examining committee, UJD issues a certificate on special professional skills of selected staff members of nuclear installations for specific activity for the given type of nuclear installation and for the following positions: 1. Scientific shift manager for start up with the right of manipulation; 2. Shift supervisor; 3. Unit supervisor; 4. Primary circuit operator; 5. Secondary circuit operator; 6. Reactor physicist; 7. Scientific shift manager for start up without the right of manipulation. Examinations of

  11. professional status and the personnel functionary in the sadf

    African Journals Online (AJOL)

    PROFESSIONAL STATUS AND THE. PERSONNEL FUNCTIONARY IN THE SADF. By R Adm R. Eberlein*. Introduction. During the last year or so there has developed an increasing awareness among personnel functionaries in the SA Defence Force of a move- ment aimed at obtaining recognition of the pro- fessional ...

  12. The Macro- and Micropolitics of Personnel Evaluation: A Framework.

    Science.gov (United States)

    Bridges, Edwin M.; Groves, Barry R.

    1999-01-01

    Explicates a conceptual framework for analyzing the politics of personnel evaluation in an educational context. Using several elements of the framework, discusses the politics of teacher evaluation in California in relation to the types of personnel evaluation decisions, the actors, their access to these decisions, sources and levels of power, and…

  13. Risks and health effects in operating room personnel

    NARCIS (Netherlands)

    van den Berg-Dijkmeijer, Marleen L.; Frings-Dresen, Monique H. W.; Sluiter, Judith K.

    2011-01-01

    The objective was to find the factors that pose a possible health risk to OR personnel. Work-related health problems of operating room (OR) personnel were signalled by an occupational physician and preparations for the development of new Worker's Health Surveillance (WHS) were started with a

  14. Personnel Replacements Operations during Operations Desert Storm and Desert Shield

    Science.gov (United States)

    2015-06-12

    virtue of huge purchases from international arms markets .”5 The Iraqi Army was also battle hardened from its eight year war with Iran, and it had...timelines for CRCs as well as the communication responsibilities to inform the Theater Personnel Command of inbound personnel. These doctrinal

  15. Personnel Selection Method Based on Personnel-Job Matching

    OpenAIRE

    Li Wang; Xilin Hou; Lili Zhang

    2013-01-01

    The existing personnel selection decisions in practice are based on the evaluation of job seeker's human capital, and it may be difficult to make personnel-job matching and make each party satisfy. Therefore, this paper puts forward a new personnel selection method by consideration of bilateral matching. Starting from the employment thoughts of ¡°satisfy¡±, the satisfaction evaluation indicator system of each party are constructed. The multi-objective optimization model is given according to ...

  16. Methods of selection and training of personnel for the Rajasthan atomic power station

    International Nuclear Information System (INIS)

    Sarma, M.S.R.; Wagadarikar, V.K.

    1975-01-01

    Personnel selected to work in a nuclear electric generating station rarely have the necessary knowledge and experience in all the related fields. A station can be operated and maintained and at the same time radiation doses absorbed by station personnel can be kept to a minimum only if the operating personnel are familiar with, and can be used for, all phases of station operation and the maintainers have more than one skill or trade. More technical knowledge and more diversified skills, in addition to those required in other industries, are needed because of the nature of the nuclear reactor and the associated radiation environment and high automation. A training programme has been developed at the Nuclear Training Centre (NTC) near the Rajasthan Atomic Power Station (RAPS), Kota, India, to cater to the needs of the operation and maintenance personnel for nuclear power stations including the Madras Atomic Power Station. This programme has been in operation for the last five years. The paper describes the method of recruitment/selection of various categories of personnel and the method of training them to meet the job requirements. (author)

  17. Risk-based Operation and Maintenance Approach for Wave Energy Converters Taking Weather Forecast Uncertainties into Account

    DEFF Research Database (Denmark)

    Ambühl, Simon; Kramer, Morten Mejlhede; Sørensen, John Dalsgaard

    2016-01-01

    Inspection and maintenance costs are significant contributors to the cost of energy for wave energy converters. Maintenance can be performed after failure (corrective) or before a breakdown (preventive) occurs. Furthermore, helicopter and boat can be used to transport equipment and personnel to t...

  18. Software Maintenance Management Evaluation and Continuous Improvement

    CERN Document Server

    April, Alain

    2008-01-01

    This book explores the domain of software maintenance management and provides road maps for improving software maintenance organizations. It describes full maintenance maturity models organized by levels 1, 2, and 3, which allow for benchmarking and continuous improvement paths. Goals for each key practice area are also provided, and the model presented is fully aligned with the architecture and framework of software development maturity models of CMMI and ISO 15504. It is complete with case studies, figures, tables, and graphs.

  19. Trends and Perspective in Industrial Maintenance Management

    DEFF Research Database (Denmark)

    Luxhoj, James T.; Thorsteinsson, Uffe; Riis, Jens Ove

    1997-01-01

    With increased global competition for manufacturing, many companies are seeking ways to gain competitative advanges with respect to cost, service, quality and on-time deliveries. The role that effective maintenance management plays in contributing to overall organizational productivity has received...... increased attention. Trends and perspective in industrial maintenance are presented. The result of benchmarking studies from Scandinavia and United States are also presented and compared. Case studies that examine maintenance methods, knowledge, organization and information systems in three Danish...

  20. Taipower plans to cut O and M costs [reactor maintenance management

    International Nuclear Information System (INIS)

    Tsui, S.J.

    1989-01-01

    Taipower aims to reduce operation and maintenance costs at its three BWRs, as well as the time devoted by plant personnel to O and M paper work, by ensuring that maintenance and spare-parts management is systematic and well documented. It is currently developing an on-line maintenance information system, known as the Maintenance Management Computerization System (MMCS), which can be accessed from any of Taipower's plants. MMCS is designed to be an on-line interactive multiple-user system through which the authorized user has immediate access to maintenance information. It will be used for preventive and corrective maintenance, surveillance tests, tagging, document control, instrument calibration and refuelling outage management. The system is simple to operate, using pull-down menus and standard text. (author)

  1. Machinery prognostics and prognosis oriented maintenance management

    CERN Document Server

    Yan, Jihong

    2014-01-01

    This book gives a complete presentatin of the basic essentials of machinery prognostics and prognosis oriented maintenance management, and takes a look at the cutting-edge discipline of intelligent failure prognosis technologies for condition-based maintenance.  Latest research results and application methods are introduced for signal processing, reliability moelling, deterioration evaluation, residual life prediction and maintenance-optimization as well as applications of these methods.

  2. Lessons learned from operating experience, maintenance procedures and training measures

    International Nuclear Information System (INIS)

    Guttner, K.; Gronau, D.

    2003-01-01

    Training programmes for nuclear facility personnel as a result of the developing phase of SAT have to be approved in the subsequent implementation and evaluation phases with the consequence of several feedback activities in the whole training process. The effectiveness of this procedure has to be evaluated especially with respect to an improvement of safety culture, shorter outage times or better plant performance, resulting in a smaller number of incidents due to human failures. The first two arguments are directly connected with all types of maintenance work in a nuclear power plant and the related preparatory training measures. The reduction of incidents due to human failures is the result of different influences, i.e. training of the operational as well as of the maintenance personnel together with changes of the operating procedures or system design. Though an evaluation of the training process should always be based on a clear definition of criteria by which the fulfilment of the learning objectives can be measured directly, the real effectiveness of training is proven by the behaviour and attitude of the personnel which can only be taken from indirect indicators. This is discussed in more detail for some examples being partly related to the above mentioned arguments. An excellent plant performance, representing a general objective of all activities, can be analysed by the changed number and reasons of incidents in a plant during its operation time. Two further examples are taken from the reactor service field where there is a tendency to reduce the individual dose rates by changed devices and/or procedures as an output from training experience with mockups. Finally the rationalisation of refresher training for operational personnel by the use of interactive teaching programs (Computer Based Training - CBT) is presented which integrate learning objectives together with a test module. (author)

  3. Strategies Utilized by Superintendents and Mathematics District Personnel That Impact Minority Student Outcomes in Algebra

    Science.gov (United States)

    DuPree, Jared Bernard

    2013-01-01

    This study applies the constructs from effective instruction from the literature on teacher education to understand the impact of school district strategies on algebra outcomes for minority students. The purpose of this study was to examine the strategies utilized by superintendents and district personnel and the impact of these identified…

  4. 29 CFR 1926.552 - Material hoists, personnel hoists, and elevators.

    Science.gov (United States)

    2010-07-01

    ..., Hoists, Elevators, and Conveyors § 1926.552 Material hoists, personnel hoists, and elevators. (a) General... booms on hoists is prohibited. (6) The use of endless belt-type manlifts on construction shall be... shall be installed to function in case of rope failure. (7) All material hoist towers shall be designed...

  5. Inspection of licensee - Maintenance programme and activities

    International Nuclear Information System (INIS)

    2013-01-01

    An effective maintenance programme is critical to sustained safe and reliable operation of nuclear power plants. The Working Group on Inspection Practices (WGIP) concluded that when a licensee has an effective maintenance programme, the overall operating safety of the plant is improved and the protection of public health and safety enhanced. All Regulatory Bodies (RB) consider maintenance to be an important area for oversight. Although a variety of inspection practices are being used; RB are actively monitoring licensee performance. Specifically the following conclusions were reached and commendable practices identified: - Maintenance oversight by regulators appears to be in a stable continuous improvement state. Most regulators are executing inspection oversight based on an existing regulatory framework. - The performance of a licensee's maintenance programme is recognized as important part of maintaining nuclear safety. The result of the maintenance program assessment is included in the overall performance assessment of a license. - Maintenance inspection activities are recognized as an important part of the regulatory oversight process. Inspection activities are based on the safety significance and nature of work being performed by the licensee. - The effectiveness of the maintenance inspection activities is recognized to rely on properly qualified inspectors; who are adequately supported by specialists. Training and qualification of inspectors should be based on how the RB reviews and inspects licensee maintenance programmes. - Reporting requirements are identified to provide information on the licensees maintenance programme, and to help guide inspection activities. - Performance Indicators are recognized as a useful tool for helping focus regulatory activities. Basic PI are identified and tracked by the RB, and use of PI by the licensee is monitored. - Inspections are designed to confirm that the licensee is planning and scheduling maintenance with due

  6. Qualification and training of personnel for nuclear equipment programmes

    International Nuclear Information System (INIS)

    Montagnier, S.

    1980-01-01

    The Equipment Department of Electricite de France has the task of designing, co-ordinating the construction of and commissioning the power stations required to feed the grid as part of the country's energy policity. The French nuclear programme may seem ambitious - 35.000 to 40.000 MW in service by 1985 - but it should be remembered that the first nuclear power plant construction in France goes back more than 20 years and that, as a result of this, the Equipment Department already has qualified staff at its disposal. Hence the proposed training activities take into account the educational background of such personnel and the number of persons concerned. These activities can be divided into (1) the professional orientation phase, intended for recently recruited staff members and consisting of discussion and instruction seminars aimed at facilitating the induction of the young recruit into EDF's departments, and (2) the training and retraining phase, intended for all staff in accordance with each person's particular job and made up, as the case may be, of courses in new theoretical knowledge, updating of previous knowledge, often accompanied by extensive practical work in the field, discussion of working methods, study of new operational techniques, and so forth. The teaching methods adopted naturally take into account the professional level of the trainees and are therefore usually 'active' or 'semi-active', entailing groups of the order of 12 persons, with effective participation by their supervisors. (author)

  7. Maintenance improvement program

    International Nuclear Information System (INIS)

    Derbonne, D.R.; Plunkett, T.F.; Simpson, J.R.

    1989-01-01

    During fuel cycle 1 at River Bend station, considerable effort was expended to reduce corrective maintenance work orders (MWOs) to <1,000. This was done by complementing the plant staff with costly contract personnel. Coming out of the first refueling outage, most contract personnel were released. The change in MWO backlog started a steady rise. It became readily apparent that to avoid costly contract staff time, a maintenance improvement program (MIP) was necessary. The MIP Was primarily directed at two areas: crew efficiency improvements and improved preplanned MWO packages. The overall effect of the MIP was to achieve significant productivity improvements with reduced operation and maintenance cost by providing frequent accountability to all levels of maintenance supervision. The MIP also produced a feeling of pride among the maintenance department employees that had not really existed before. This was the best benefit of all

  8. The maintenance and the radiological safety in gamma irradiation facilities

    International Nuclear Information System (INIS)

    Torres C, G.

    1991-01-01

    Presently work the outstanding aspects of the operation and maintenance of the Industrial Irradiator JS 6500 are described that the ININ operates, in the Nuclear Center of Salazar, Estado de Mexico and its relationship with the radiological security for the occupationally exposed personnel. The signal devices are described and of control of the associate teams, as the system of cooling of the source; the plant of treatment of water of the pool and the system of extraction of ozone. On the other hand the procedures are mentioned for the sure operation and the application of the annual programs of maintenance, in their aspects of more interest, to reduce to the maximum the correction of faults, during the routine operation

  9. Stress, Sleep and Depressive Symptoms in Active Duty Military Personnel.

    Science.gov (United States)

    Chou, Han-Wei; Tzeng, Wen-Chii; Chou, Yu-Ching; Yeh, Hui-Wen; Chang, Hsin-An; Kao, Yu-Chen; Huang, San-Yuan; Yeh, Chin-Bin; Chiang, Wei-Shan; Tzeng, Nian-Sheng

    2016-08-01

    The military is a unique occupational group and, because of this, military personnel face different kinds of stress than civilian populations. Sleep problems are an example. The purpose of this study was to investigate the relationship between sleep problems, depression level and coping strategies among military personnel. In this cross-sectional study, military personnel completed the Beck Depression Inventory, the Pittsburgh Sleep Quality Index and the Jalowiec Coping Scale. An evaluation of the test scores showed that officers had better sleep quality and fewer depressive symptoms than enlisted personnel. Military personnel with higher educational levels and less physical illness also had fewer depressive symptoms. Officers and noncommissioned officers preferred problem-focused strategies. Those with higher Beck Depression Inventory and Pittsburgh Sleep Quality Index scores and those who drank alcohol frequently preferred affective-focused strategies. Our results revealed that sleep quality, physical illness and alcohol consumption were associated with the mental health of military personnel. Treating these factors may improve the mental health of military personnel and enhance effective coping strategies. Copyright © 2016 Southern Society for Clinical Investigation. Published by Elsevier Inc. All rights reserved.

  10. Instrumentation maintenance

    International Nuclear Information System (INIS)

    Mack, D.A.

    1976-09-01

    It is essential to any research activity that accurate and efficient measurements be made for the experimental parameters under consideration for each individual experiment or test. Satisfactory measurements in turn depend upon having the necessary instruments and the capability of ensuring that they are performing within their intended specifications. This latter requirement can only be achieved by providing an adequate maintenance facility, staffed with personnel competent to understand the problems associated with instrument adjustment and repair. The Instrument Repair Shop at the Lawrence Berkeley Laboratory is designed to achieve this end. The organization, staffing and operation of this system is discussed. Maintenance policy should be based on studies of (1) preventive vs. catastrophic maintenance, (2) records indicating when equipment should be replaced rather than repaired and (3) priorities established to indicate the order in which equipment should be repaired. Upon establishing a workable maintenance policy, the staff should be instructed so that they may provide appropriate scheduled preventive maintenance, calibration and corrective procedures, and emergency repairs. The education, training and experience of the maintenance staff is discussed along with the organization for an efficient operation. The layout of the various repair shops is described in the light of laboratory space and financial constraints

  11. Personnel radiation safety in nuclear power plants

    International Nuclear Information System (INIS)

    Elkert, J.

    1979-05-01

    The principal contributions to the radiation doses of the Swedish power reactor personnel are identified. The possi bilities to reduce these doses are examined. The radiation doses are analyzed according to different personnel categories, specific maintenance operations or inspections and to different radiation activities. Suggestions are given for reducing the radiation doses. (L.E.)

  12. Development of ergonomics audits for bagging, haul truck and maintenance and repair operations in mining.

    Science.gov (United States)

    Dempsey, Patrick G; Pollard, Jonisha; Porter, William L; Mayton, Alan; Heberger, John R; Gallagher, Sean; Reardon, Leanna; Drury, Colin G

    2017-12-01

    The development and testing of ergonomics and safety audits for small and bulk bag filling, haul truck and maintenance and repair operations in coal preparation and mineral processing plants found at surface mine sites is described. The content for the audits was derived from diverse sources of information on ergonomics and safety deficiencies including: analysis of injury, illness and fatality data and reports; task analysis; empirical laboratory studies of particular tasks; field studies and observations at mine sites; and maintenance records. These diverse sources of information were utilised to establish construct validity of the modular audits that were developed for use by mine safety personnel. User and interrater reliability testing was carried out prior to finalising the audits. The audits can be implemented using downloadable paper versions or with a free mobile NIOSH-developed Android application called ErgoMine. Practitioner Summary: The methodology used to develop ergonomics audits for three types of mining operations is described. Various sources of audit content are compared and contrasted to serve as a guide for developing ergonomics audits for other occupational contexts.

  13. IAEA activities in nuclear power plant personnel training and qualification

    International Nuclear Information System (INIS)

    Mautner-Markhof, F.

    1993-01-01

    Training to achieve and maintain the qualification and competence of nuclear power personnel is essential for safe and economic nuclear power. Technical Cooperation Meeting on Training-Related Activities for Nuclear Power Plant (NPP) Personnel in the countries of Central and Eastern Europe (CEEC) and of the former Soviet Union (FSU) has as its main objective the identification, through information exchange and discussion, of possible Technical Cooperation (TC) projects to assist Member States in meeting NPP personnel training needs and priorities, including the enhancing of training capabilities

  14. Special training of shift personnel

    International Nuclear Information System (INIS)

    Martin, H.D.

    1981-01-01

    The first step of on-the-job training is practical observation phase in an operating Nuclear Plant, where the participants are assigned to shift work. The simulator training for operating personnel, for key personnel and, to some extent, also for maintenance personnel and specialists give the practical feeling for Nuclear Power Plant behaviour during normal and abnormal conditions. During the commissioning phase of the own Nuclear Power Plant, which is the most important practical training, the participants are integrated into the commissioning staff and assisted during their process of practical learning by special instructors. The preparation for the licensing exams is vitally important for shift personnel and special courses are provided after the first non-nuclear trial operation of the plant. Personnel training also includes performance of programmes and material for retraining, training of instructors and assistance in building up special training programmes and material as well as training centers. (orig./RW)

  15. Professional services contract manager development and certification strategy : spr 696 : final report.

    Science.gov (United States)

    2013-02-27

    SCDOT hires many consultants to provide professional services in support of its planning, design, construction and : maintenance projects. SCDOT personnel responsible for procuring and administering these professional service : contracts, especially ...

  16. An independent safety assessment of Department of Energy nuclear reactor facilities: Training of operating personnel and personnel selection

    International Nuclear Information System (INIS)

    Drain, J.F.

    1981-02-01

    This study has been prepared for the Department of Energy's Nuclear Facilities Personnel Qualification and Training (NFPQT) Committee. Its purpose is to provide the Committee with background information on, and assessment of, the selection, training, and qualification of nuclear reactor operating personnel at DOE-owned facilities

  17. Double-Shell Tanks System Maintenance and Recovery Needs Report

    International Nuclear Information System (INIS)

    SMITH, D.F.

    2002-01-01

    This report represents an initial effort to identify maintenance equipment needed to support critical components used for delivery of waste feed to the Waste Isolation and Treatment Plant (WTP). Rough estimates of cost benefits for selected maintenance capabilities are provided. A follow-on to this report should include a detailed cost analysis showing cost benefits and tradeoffs in selection and development of specific maintenance capabilities. Critical component failures during delivery of waste feed from the DSTs to the WTP have the potential to idle WTP facilities if the duration of the recovery operations are long enough to allow the WTP to exhaust a planned 60-day lag storage capacity for waste feed. If a critical component within the transfer route fails, current planning does not provide for an alternative HLW feed source. Critical components with relatively high failure frequencies and recovery times are identified, along with a summary of documentation regarding historical maintenance and recovery operations and planning. Components, such as mixer pumps and transfer pumps, are estimated to have relatively long recovery times due, in part, to the current practice of sending spare pumps, when needed, off-site to a remote location, for vendor refurbishment and testing prior to installation in a tank. No capability is provided on-site for pump ''run-in''. As neither the spare pumps in storage, installed pumps, or other critical components are subjected to periodic preventive maintenance, and these critical components are planned to be operated intermittently over a long period of time, component failures are to be expected. Recommendations are made for further analysis to identify specific equipment cost benefits, development costs, and tradeoffs in selection of alternatives. This new equipment will provide capabilities for component storage and maintenance in line with vendor recommendations, reduce the duration of recovery operations, and support personnel

  18. Career fields for inspection and enforcement personnel

    International Nuclear Information System (INIS)

    Bartley, H.J.; Harrison, O.J.; Kraas, I.W.; Hagerup, J.E.; Heyer, F.H.K.; Schwartz, E.G.

    1978-09-01

    This document is a report on the development of career fields for Headquarters and regional positions of NRC/IE. Data on the development of qualifications requirements were examined for commonality of knowledge and performance; career fields were postulated as a result of that examination, and then those career fields were tested and revised by more extensive examination. Proposed as a result of this work are four career fields: Construction--Vendor, Health Physics, Reactor Operations, and Safeguards; and two ''career ladders'': Fuel Facilities and Investigation. (The term ''career ladder'' was chosen to describe the relatively narrow patterns of positions open to its members.) All career fields include subfields, which are described in full in the report. In addition to recommending acceptance of these career fields, this document proposes the combination of certain subfields, the retitling of some positions, and the adoption of a standard nomenclature for all NRC/IE positions. 56 figures, 2 tables

  19. Maintenance planning and performance software for valve packing programs at nuclear power stations (ValvePro Version 2.5)

    International Nuclear Information System (INIS)

    Hutcheson, N.D.

    1994-01-01

    ValvePro Version 2.5 for Windows was developed to help power plant maintenance personnel improve maintenance productivity and quality through a simple, attractive software program, which can be installed on personal computer systems in use at many utilities today. This paper explains the functions of this software and how it can be used by a maintenance organization as a foundation for a consistent, effective valve packing program utilizing sound packing principles

  20. Work environment stressors and personnel efficacy in Nigeria's ...

    African Journals Online (AJOL)

    Work environment stressors and personnel efficacy in Nigeria's maritime industry. ... Journal Home > Vol 15, No 1 (2017) > ... employees and corporate organizations need to manage stress by identifying the stressors and stress levels.

  1. Maintenance and Repair of Concrete Structures

    NARCIS (Netherlands)

    Bijen, J.M.J.M.

    1989-01-01

    In 1987 and 1988 a series of articles was published in the Dutchjournal "Cement" about maintenance and repair of concrete structures. The series was written to promote the transfer of know-how concerning maintenance and repair of concrete structures. Use has been made of know-how developed in the

  2. VEHICLE REPAIR AND MAINTENANCE COSTS IN NIGERIA ...

    African Journals Online (AJOL)

    A standard model was established for the prediction of repair and maintenance costs of vehicles in a non-profit making government parastatal. The model was derived based on data collected over a ten year period from a non-profit making government parastatal, and it predicts repair and maintenance costs as a linear ...

  3. Principles of machine operation and maintenance

    CERN Document Server

    Jeffrey, Dick

    2013-01-01

    This book explains how rotating machinery works, and the role of the maintenance engineer in ensuring its proper operation. Stress is laid on the need for the trainee engineer to develop skills in diagnosis and troubleshooting as well as practicalexpertise in maintenance procedures.

  4. Service and Maintenance - Lillgrund Offshore Wind Farm. Lillgrund Pilot Project

    Energy Technology Data Exchange (ETDEWEB)

    Soederberg, David; Weisbach, Henrik (Vattenfall Vindkraft AB, Stockholm (Sweden))

    2008-11-15

    This report aims to provide information of, and experiences from, service and maintenance of Lillgrund Offshore Wind Farm. The report deals with operation and maintenance (O and M) during construction, commissioning and the first three months of operation. Focus has been to describe the organization and cooperation between Vattenfall and Siemens. Experiences have been collected by interviews with representatives from Siemens and Vattenfall. The O and M strategy defined by Lillgrund's service and maintenance contract are based on a gradual take over of O and M. Siemens will be responsible for maintenance of Lillgrund during the first five years. During this five-year period, Vattenfall will build up its own maintenance organization for Lillgrund. The first three years, Vattenfall's technicians are supposed to form 30 % of the total number of maintenance technicians. The fourth and fifth year, the corresponding amount should be 50 %. During daytime, Lillgrund is operated locally. During nights and weekends, it is operated remotely by Vattenfall's operating centre in Esbjerg. The major O and M experience from Lillgrund is the need for good administrative and technical information systems. These systems should be implemented as soon as possible because of the large amounts of documentation that are created during the commissioning phase. The technical information systems must be able to present historic data of measurements in order to see trends and analyse faults

  5. Mean annual and collective radiation doses of Perm' province personnel

    International Nuclear Information System (INIS)

    Poplavskij, K.K.; Rotenberg, L.I.

    1978-01-01

    The average annual and collective doses of radiation received by personnel of radiologic facilities and by the population of the region under study as a whole are estimated. Tabular data on radiation loads are presented according to the age and sex of personnel and to the type of radiation sources used. The procedure employed in this study allows one to evaluate objectively the conditions of work with sources of ionizing radiation

  6. Sensor/signal monitoring and plant maintenance

    International Nuclear Information System (INIS)

    Ciftcioglu, Oe.; Tuerkcan, E.

    1994-02-01

    Nuclear Power Plant (NPO) availability is determined by the intended functionality of safety related system and components. Therefore, maintenance is an important issue in a power plant connected to the plant's reliability and safety. The traditional maintenance policies proved to be rather costly and even not effectively addressing NPP requirements. Referring to these drawbacks, in the last decade, in the nuclear reliability centered maintenance (RCM) gained substantial interest due to its merits. In the formal implementation of RCM, apparently, predictive maintenance is not considered. However, with the impact of modern real-time and on-line surveillance and monitoring methodologies, the predictive maintenance procedures like sensor/signal verification and validation are to be included into RCM. (orig.)

  7. TLD personnel dosimetry and its relationship with the radiodiagnostic training

    International Nuclear Information System (INIS)

    Gaona, E.; Franco E, J.G.; Gaona C, E.

    2002-01-01

    The personnel dosimetry and the training in radiological protection in radiodiagnostic in Mexico before 1997 were almost nonexistent except few services of public and private radiology, we can to say that the personnel dosimetry and the obligatory training was born in the year 1997, together with the present Mexican Official Standards in radiology. This study has the purpose to make an evaluation of the personnel dosimetry of 110 radiology services distributed in the Mexican Republic for the year 2001 and to estimate the annual and bimonthly mean doses, as well as its trust intervals and its relationships with the personnel training in radiological protection by means of a sampling that was realized in two stages (1997 and 2000) in the metropolitan area of Mexico City. The results show that the received doses by the medical and technical personnel in the participating radiology services are in the 0.03 mSv and 0.94 mSv interval and the mean is 0.25 mSv. The estimated annual personnel dose would be in the 0.18 mSv to 5.64 mSv interval, which are values very lower to the annual dose limit that is 50 mSv and its magnitude is similar to the effective annual dose by natural background radiation. In the first stage in training was found that there is not a significant difference in the response frequencies among the medical and technical personnel with a p < 0.05. The 52% of the occupational exposure personnel of radiology uses dosemeter, but only 17% of them know the dose reports. the 15.8% of personnel considers that dosemeter protects against radiation and only 16.5% knows the annual maximum permissible dose for stochastic effects. The second stage, the results shown that there is a significant difference in the response of frequencies among medical and technical personnel, the same results which are obtained for members and non members of a professional association with a p < 0.05. The 38% has personnel dosimetry, the 19% knows the principles of radiological

  8. [Trends and perspectives in health personnel research in the Americas].

    Science.gov (United States)

    Nogueira, R P

    1985-01-01

    It is paradoxical that the lion's share (60 to 80%) of the health budgets of the countries is invested in meeting the personnel costs of the system, and yet few studies have been done to assess the production of that personnel. The importance of personnel as a basic constituent of the sector and its presence at all levels of medical care (from physicians to auxiliaries) makes it vitally important to know how it has evolved over time so that trends can be anticipated and policies guided accordingly. This work seeks to fill, at least partly, the information gap on this subject. The method by which the author has chosen to make this evaluation is to examine the published literature on health personnel, inasmuch as the situation is reflected in articles and documents on the subject. He therefore examined the general trends observed in the following specific areas: increase of personnel and medical schools, the upsurge in the international migration of physicians, changes in the pace of personnel production, emphasis on the integration of services and education, etc. After a detailed analysis of the articles in Educación médica y salud and the Index Medicus Latinoamericano classified by subjects, the author concludes that, although much has been written on health personnel, little in-depth research has been done in primary data sources, and what is done is predominantly surveys. Besides, this research is concerned essentially with the curriculum and organization of university instruction, and betrays a great concern with coverage extension and primary care and with the training and use of auxiliary personnel, planning, and continuing education.

  9. DOD Recovery personnel and NASA technicians inspect Friendship 7 spacecraft

    Science.gov (United States)

    1964-01-01

    Department of Defense Recovery personnel and spacecraft technicians from NASA adn McDonnell Aircraft Corp., inspect Astronaut John Glenn's Mercury spacecraft, Friendship 7, following its return to Cape Canaveral after recovery in the Atlantic Ocean.

  10. MODERN RESEARCHES OF PERSONNEL. SOCIOLOGICAL ANALYSIS OF PERSONNEL MANAGEMENT AND EMPLOYMENT IN DISSERTATION RESEARCHES

    Directory of Open Access Journals (Sweden)

    F. A. Dudueva

    2016-01-01

    Full Text Available The article is based on dissertation papers of PhD and Ph.D. defended in the last decade on the subject of human resource management and employment in general. The article discusses the features of professional development in modern Russia. In view of the development of information technology the need to use knowledge management technologies as a basis for professional development of the individual is highlighted. In this regard, particular attention is paid to the development of the ICT sector personnel, and it is noted the importance of the impact of the transformation of the national education system in the development of personnel in Russia, in particular the transition to a competence-based approach. The article also highlights key factors of motivation of different categories of employees, current models of material and immaterial motivation, special attention is paid to the destructive model of motivation. In the conditions of transitive economy it is important to highlight the features of a new type of employment and the corresponding ways of organizing work in a globalized, postindustrial society. In this regard, special attention is paid to the mechanisms for effective management of employment in the social market economy. Moreover, there is a need of an active employment policy in Russia, resulting in the need to fill labor shortages in the country. One of the most effective ways to solve this problem is the labor migration. 

  11. Efficacy and safety of intravenous fentanyl administered by ambulance personnel

    DEFF Research Database (Denmark)

    Friesgaard, Kristian Dahl; Nikolajsen, Lone; Giebner, Matthias

    2016-01-01

    BACKGROUND: Management of pain in the pre-hospital setting is often inadequate. In 2011, ambulance personnel were authorized to administer intravenous fentanyl in the Central Denmark Region. The aim of this study was to evaluate the efficacy and safety of intravenous fentanyl administered...... by ambulance personnel. METHODS: Pre-hospital medical charts from 2348 adults treated with intravenous fentanyl by ambulance personnel during a 6-month period were reviewed. The primary outcome was the change in pain intensity on a numeric rating scale (NRS) from before fentanyl treatment to hospital arrival...... patients (1.3%) and hypotension observed in 71 patients (3.0%). CONCLUSION: Intravenous fentanyl caused clinically meaningful pain reduction in most patients and was safe in the hands of ambulance personnel. Many patients had moderate to severe pain at hospital arrival. As the protocol allowed higher doses...

  12. Training for power plant personnel on hydrogen production and control

    International Nuclear Information System (INIS)

    Dickelman, G.J.

    1982-01-01

    It is the purpose of this paper to address the issue of training for power plant personnel in the area of hydrogen control. The authors experience in the training business indicates that most of the operations and engineering personnel have a very limited awareness of this phenomenon. Topics discussed in this paper include: 1) theory of hydrogen combustion kinetics; 2) incidents involving hydrogen combustion events; 3) normal operations interfacing with hydrogen; 4) accident conditions; and 5) mitigation schemes

  13. Enlisted Personnel Individualized Career System (EPICS) Test and Evaluation

    Science.gov (United States)

    1984-01-01

    The EPICS program, which was developed using an integrated personnel systems approach ( IPSA ), delays formal school training until after personnel have...received shipboard on-job training complemented by job performance aids (3PAs). Early phases of the program, which involved developing the IPSA EPICS...detailed description of the conception and development of the EPICS IPSA model, the execution of the front-end job design analyses, 3PA and instructional

  14. Experience in the application of S.A.T. for maintenance training at Cernavoda N.P.P. - U1

    International Nuclear Information System (INIS)

    Erdinici, Abdula

    1999-01-01

    A short history of Maintenance Training at Cernavoda NPP Unit 1 will be presented highlighting the fact that: - Cernavoda NPP Unit 1 is the first nuclear power plant in Romania; - Construction/Commissioning and initial operation was done under the direct supervision of expert specialists (from Canada, Italy and US). In addition, the application of Systematic Approach to Training (S.A.T.) principles at Cernavoda NPP for all training activities will be addressed. A short history of how maintenance training activity developed over time will be detailed to address the following issues: - how the S.A.T. stages were applied; - how maintenance experience was gained during Unit 1 Construction/Commissioning initial operation and how this experience has been evaluated, credited and transferred; - how maintenance training was documented; - how the maintenance training activity is organized; - on-the-job training for maintenance personnel. Concerning other training activities at Cernavoda NPP the maintenance begins with a training needs analysis for each maintenance position. These needs are documented through Job Related Training requirements (JRTR's) produced for each maintenance position. During commissioning/initial operation, only necessary maintenance training has been delivered, such as: pump alignments, use of maintenance procedure, application of maintenance documentation. The 'hands-on' activities under expatriates specialists supervision was the main training activity. Training coordinators for each maintenance activity (Mechanical, EI. I-and-C, and Services maintenance) have been appointed to administer maintenance training. Following the declaration of the unit in commercial operation, a new approach has been taken related to maintenance Bucharest A Task Force to evaluate maintenance training status and experience has been established. This group was initiated at the Training Department initiative and it was initially co-ordinated by a Canadian maintenance

  15. Frequent fliers, school phobias, and the sick student: school health personnel's perceptions of students who refuse school.

    Science.gov (United States)

    Torrens Armstrong, Anna M; McCormack Brown, Kelli R; Brindley, Roger; Coreil, Jeannine; McDermott, Robert J

    2011-09-01

    This study explored school personnel's perceptions of school refusal, as it has been described as a "common educational and public health problem" that is less tolerated due to increasing awareness of the potential socioeconomic consequences of this phenomenon. In-depth interviews were conducted with school personnel at the middle school (N = 42), high school (N = 40), and district levels (N = 10). The findings focus on emergent themes from interviews with school health personnel (N = 12), particularly those themes related to their perceptions of and role in working with school-refusing students. Personnel, especially school health services staff, constructed a typification of the school-refusing student as "the sick student," which conceptualized student refusal due to reasons related to illness. Personnel further delineated sick students by whether they considered the illness legitimate. School health personnel referenced the infamous "frequent fliers" and "school phobics" within this categorization of students. Overarching dynamics of this typification included parental control, parental awareness, student locus of control, blame, and victim status. These typifications influenced how personnel reacted to students they encountered, particularly in deciding which students need "help" versus "discipline," thus presenting implications for students and screening of students. Overall, findings suggest school health personnel play a pivotal role in screening students who are refusing school as well as keeping students in school, underscoring policy that supports an increased presence of school health personnel. Recommendations for school health, prevention, and early intervention include the development of screening protocols and staff training. © 2011, American School Health Association.

  16. Maintenance and Outage Management Assessment (MOMA)

    International Nuclear Information System (INIS)

    2005-01-01

    The competitive environment has significant implications for nuclear power plant (NPP) operations, which include, inter alia, the need for efficient use of resources and effective management of plant activities of maintenance and outages. The purpose of NPP maintenance and outages is to allow NPPs to use all those functions necessary for safe and reliable power production by keeping them available and adequate maintenance programme is essential. The maintenance programme covers all preventive and remedial measures, both administrative and technical, necessary to identify and mitigate degradation of a functioning system, structure or component, or restore the design functions of a failed system, structure or component to an acceptable level. In response to the needs of MSs, NPES (Nuclear Power Section, Division of Nuclear Power, IAEA) plans to strengthen its services. NPES services will not only continue to provide its 'traditional' products of publications of nuclear industrial best practices and technical implementation of TC projects on plant maintenance and outage management, but also be expanded to deliver, in a timely manner, technical support missions as requested by MSs for NPPs. One of many services is Maintenance and Outage Management Assessment (MOMA). The NPP can obtain support and assistance in assessment and optimisation of its maintenance program and/or outage management. It aims to help the NPP improve its performance of maintenance and outage in a competitive nuclear power business environment. The specific benefits of the assessment are as follows: a) disseminate nuclear industrial best practices on maintenance program and outage management in the world, b) benchmark, evaluate and optimise the approach of maintenance program and outage management and c) identify solutions to known problems at nuclear power plants, if any. MOMA is conducted at the request of NPPs of any IAEA Member States. MOMA consists in a technical mission/visit for 1-3 weeks by

  17. Test and maintenance of the emergency power supply in the nuclear power plant Biblis

    International Nuclear Information System (INIS)

    Kotthoff, K.; Huren, H.

    1986-01-01

    Besides design and construction test and maintenance play an important role for the availability of the emergency power supply. As an example test and maintenance provided for the emergency power supply in a German 4-loop PWR will be described. In general one has to differentiate between test and maintenance performed during power operation of the plant and those carried out during the refuelling outage. For both periods of operation detailed information will be given including type, extent and frequency of test and maintenance work. The results of test and maintenance up to now will be discussed. (authors)

  18. Test and maintenance of the emergency power supply in the nuclear power plant Biblis

    Energy Technology Data Exchange (ETDEWEB)

    Kotthoff, K. [Gesellschaft fuer Reaktorsicherheit - GRS mbH, Schwertnergasse 1, D-5000 Koeln 1, Cologne (Germany); Huren, H. [Rheinisch-Westfaelisches Elektrizitaetswerk AG, Betriebsverwaltung Biblis, Biblis (Germany)

    1986-02-15

    Besides design and construction test and maintenance play an important role for the availability of the emergency power supply. As an example test and maintenance provided for the emergency power supply in a German 4-loop PWR will be described. In general one has to differentiate between test and maintenance performed during power operation of the plant and those carried out during the refuelling outage. For both periods of operation detailed information will be given including type, extent and frequency of test and maintenance work. The results of test and maintenance up to now will be discussed. (authors)

  19. Survey of NDT techniques, services, qualifications and certification of NDT personnel-preliminary results

    International Nuclear Information System (INIS)

    Aleta, C.R.; Kinilitan, V.E.; Lailo, R.M.

    1987-01-01

    This paper presented the results of a survey conducted to determine the profile of the NDT industry including its problems. A questionnaire designed in three parts 1) present practices on qualification and certification, 2) NDT equipment and 3) services and problems in NDT. Of the 36 firms contacted only 20 responded. Results indicated the following: a) most firms are engaged in four (4) main techniques, RT, UT, MT and PT. Only 2 indicated capability of ET. b) level III personnel are relatively few in number, c) most firms allow the ASNT recommendation as a basis for their qualifications and certification and are in favor of standardization of the qualification and certification process and supportive of a national center for training of NDT personnel and d) most firms perceived the lack of adequate repair/maintenance skills/facilities, followed by high cost of equipment and the lack of national standard for qualification and certification. (ELC)

  20. Criteria for maintenance and repair - LMFBR steam generators

    International Nuclear Information System (INIS)

    Essebaggers, J.

    1975-01-01

    The maintenance and repair criteria will be reviewed with respect to the designs presently under construction for the SNR-300 plant. This criteria shall be based upon the philosophy that safety and reliability are of the highest importance at all operating modes, while availability shall be maximized. To maximize the safety of the steam generator, measures have been taken to reduce the possibilities of failure by simplicity in design, choice of material, methods of fabrication and high quality assurance of critical parts of the pressure boundaries. The maintenance and repair program shall meet the same criteria or the intent of these criteria as applied for the original product. (author)

  1. A proactive condition-based maintenance strategy with both perfect and imperfect maintenance actions

    International Nuclear Information System (INIS)

    Do, Phuc; Voisin, Alexandre; Levrat, Eric; Iung, Benoit

    2015-01-01

    This paper deals with a proactive condition-based maintenance (CBM) considering both perfect and imperfect maintenance actions for a deteriorating system. Perfect maintenance actions restore completely the system to the ‘as good as new’ state. Their related cost are however often high. The first objective of the paper is to investigate the impacts of imperfect maintenance actions. In fact, both positive and negative impacts are considered. Positive impact means that the imperfect maintenance cost is usually low. Negative impact implies that (i) the imperfect maintenance restores a system to a state between good-as-new and bad-as-old and (ii) each imperfect preventive action may accelerate the speed of the system's deterioration process. The second objective of the paper is to propose an adaptive maintenance policy which can help to select optimally maintenance actions (perfect or imperfect actions), if needed, at each inspection time. Moreover, the time interval between two successive inspection points is determined according to a remaining useful life (RUL) based-inspection policy. To illustrate the use of the proposed maintenance policy, a numerical example finally is introduced. - Highlights: • A new imperfect maintenance model for deterioration system is proposed. • Both positive and negative impacts of an imperfect maintenance action are investigated. • An adaptive condition-based maintenance policy is introduced. • The optimal number of useful imperfect maintenance actions for each life cycle is optimally provided

  2. Human Resources Training Requirement on NPP Operation and Maintenance

    International Nuclear Information System (INIS)

    Nurlaila; Yuliastuti

    2009-01-01

    This paper discussed the human resources requirement on Nuclear Power Plant (NPP) operation and maintenance (O&M) phase related with the training required for O&M personnel. In addition, this paper also briefly discussed the availability of training facilities domestically include with some suggestion to develop the training facilities intended for the near future time in Indonesia. This paper was developed under the assumptions that Indonesia will build twin unit of NPP with capacity 1000 MWe for each using the turnkey contract method. The total of NPP O&M personnel were predicted about 692 peoples which consists of 42 personnel located in the head quarter and the rest 650 people work at NPP site. Up until now, Indonesia had the experience on operating and maintaining the nonnuclear power plant and several research reactors namely Kartini Reactor Yogyakarta, Triga Mark II Reactor Bandung, and GA Siwabessy Reactor Serpong. Beside that, experience on operating and maintaining the NPP in other countries would act as one of the reference to Indonesia in formulating an appropriate strategy to develop NPP human resources particularly in O&M phases. Education and training development program could be done trough the cooperation with vendor candidates. (author)

  3. Horizon Dam design, construction, and quality management

    Energy Technology Data Exchange (ETDEWEB)

    Patrick, B. [EBA Engineering Consultants Ltd., Nanaimo, BC (Canada); Sisson, R. [Canadian Natural Resources Ltd., Fort McMurray, AB (Canada)

    2010-07-01

    This paper discussed the design and construction of the Tar River Diversion Dam and the quality management system (QMS) used during construction. The project was unusual in that the company constructed the project using its own workforce, without contractors, under challenging schedule and site conditions. The topography, geology and geotechnical aspects of the site were discussed along with the embankment design, seepage control measures and construction execution. The QMS was designed to fit the needs of the unique construction execution strategy and meet safety, reliability, performance, and operation requirements, comply with all regulations and approval conditions, and identify and communicate risk to the appropriate entity. Specifications and construction procedures had to be modified to accommodate equipment operators trained with the skills and techniques of mine operations, not those associated with conventional civil construction projects. Foundation movement identified during construction required mid-build design changes, construction rescheduling, and additional deformation analyses to determine long-term stability. The QMS allowed changes in the understanding of site conditions to be quickly addressed and risks to be identified and cost-effectively mitigated. Design consultants were used to modify designs and appropriately identify and mitigate risks. The approach to embankment construction was successful because the QMS included processes for change management, issue resolution, and risk-benefit assessment, and because experienced personnel had a regular presence on the construction site and worked collaboratively. The effective QMS was deemed to be integral to the success of the construction project. 1 tab., 7 figs.

  4. Flexible Software Solution for Information System of Maintenance and Repair in Armenian NPP Medzamor

    International Nuclear Information System (INIS)

    Stoilova Yordanova, V.; Manchev, B.

    2016-01-01

    Achieving high performance in maintenance and repair activities in nuclear facilities and good results in this area is not possible without proper planning. This includes long-term, medium-term and annual planning. A computerized information maintenance management system is a tool widely used by nuclear operators to achieve safe, reliable, stable and predictable plant operation. Development and implementation of such a system in the Armenian NPP Medzamor (ANPP) was initiated by the European Commission (EC) in August 2013 based on the decision of ANPP management to improve practice in terms of planning and carrying out maintenance and repair of plant structures, systems and components (SSCs). The main purpose for the development and deployment of information maintenance management system in ANPP is creation of a systematic approach to the distribution of tasks between the maintenance personnel as well as the timing and methods of their implementation - on which systems, structures and components, maintenance frequency, while the ultimate goal is to optimize the use of resources for maintenance and to ensure plant safe operation and reliability. In November 2013 a contract between European Commission and consortium Risk Engineering -David Holding was signed, including the following supplies: Hardware for the information system of ANPP (called us Archimed MRO); Specification, design and development of the software of Archimed MRO, installation of the system, data migration, training of ANPP staff operating the system, and 9 months trial operation. In the process of specifying the functionality of the system the main purpose was to provide modern information tools to help improve the work of ANPP personnel in the following areas: Optimization of ANPP maintenance program; Planning of maintenance, repair and overhaul (MRO) activities; Effective management of the processes of MRO; Analysis of the MRO results (trend analysis, recurrence of repairs, quality of the repairs

  5. Educating personnel for nuclear technology in Czechoslovakia

    International Nuclear Information System (INIS)

    Otcenasek, P.

    1980-01-01

    The basic preconditions are discussed of educating personnel for nuclear power and nuclear technology in Czechoslovakia. In educating specialists, the high societal significance of nuclear power and the need to obtain qualified personnel for safeguarding safety and reliability of nuclear facilities operation should primarily be borne in mind. The system of training applies not only to operating and maintenance personnel of nuclear power plants but also to fuel and power generation, transport, engineering, building industry, health care, education and other personnel. (J.B.)

  6. 75 FR 4099 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Science.gov (United States)

    2010-01-26

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-06] Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional Classification and Wage Rate AGENCY: Office of... proposal. The information is used by HUD to determine or adopt prevailing wage rates for maintenance...

  7. 75 FR 37457 - Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional...

    Science.gov (United States)

    2010-06-29

    ... DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT [Docket No. FR-5376-N-54] Maintenance Wage Rate Wage Recommendation and Maintenance Wage Survey; Report of Additional Classification and Wage Rate AGENCY: Office of... proposal. The information is used by HUD to determine or adopt prevailing wage rates for maintenance...

  8. Grounds Maintenance Equipment and Procedures. Building Maintenance. Module VI. Instructor's Guide.

    Science.gov (United States)

    Crank, Virgil

    This curriculum guide, one of six modules keyed to the building maintenance competency profile developed by industry and education professionals, provides materials for two units on grounds maintenance equipment and procedures. The first unit deals with grounds maintenance equipment and includes the following lessons: safety; changing oil/filter…

  9. Operation and maintenance of the technical installations in buildings

    DEFF Research Database (Denmark)

    Nielsen, O.(red.)

    The report contains twelve papers from a seminar on operation and maintenance, held at the Danish Building Research Institute in October 1976. The papers deal, among other things, with dimensioning and balancing of pipesystems, design of ventilating systems for adequate operation and maintenance,......, cost and quality in maintenance, maintenance service companies, as well as organization and training for building services maintenance....

  10. Military personnel recognition system using texture, colour, and SURF features

    Science.gov (United States)

    Irhebhude, Martins E.; Edirisinghe, Eran A.

    2014-06-01

    This paper presents an automatic, machine vision based, military personnel identification and classification system. Classification is done using a Support Vector Machine (SVM) on sets of Army, Air Force and Navy camouflage uniform personnel datasets. In the proposed system, the arm of service of personnel is recognised by the camouflage of a persons uniform, type of cap and the type of badge/logo. The detailed analysis done include; camouflage cap and plain cap differentiation using gray level co-occurrence matrix (GLCM) texture feature; classification on Army, Air Force and Navy camouflaged uniforms using GLCM texture and colour histogram bin features; plain cap badge classification into Army, Air Force and Navy using Speed Up Robust Feature (SURF). The proposed method recognised camouflage personnel arm of service on sets of data retrieved from google images and selected military websites. Correlation-based Feature Selection (CFS) was used to improve recognition and reduce dimensionality, thereby speeding the classification process. With this method success rates recorded during the analysis include 93.8% for camouflage appearance category, 100%, 90% and 100% rates of plain cap and camouflage cap categories for Army, Air Force and Navy categories, respectively. Accurate recognition was recorded using SURF for the plain cap badge category. Substantial analysis has been carried out and results prove that the proposed method can correctly classify military personnel into various arms of service. We show that the proposed method can be integrated into a face recognition system, which will recognise personnel in addition to determining the arm of service which the personnel belong. Such a system can be used to enhance the security of a military base or facility.

  11. Operation and maintenance of offshore wind farms

    DEFF Research Database (Denmark)

    Petersen, Kristian R.; Madsen, Erik Skov; Bilberg, Arne

    The offshore wind industry is booming and larger, more efficient wind-turbines have constantly been introduced into the market. However, research within the field of the operation and maintenance (O&M) of offshore wind farms is limited as the field is still immature. In this paper, two current ma...... maintenance models - RCM and TPM - are discussed in this context. Furthermore, through a case study, the paper looks into Modularization and SSLP, as these concepts can be utilized to optimize maintenance. This is a new approach for the offshore wind industry....

  12. Quality upgrading and cost reducing effects of using an operation control system for performance of maintenance tasks

    International Nuclear Information System (INIS)

    Ramler, K.

    1996-01-01

    According to available results, the use of an operation control system has come up to expections with respect to a quality enhancement of maintenance work. The tasks are performed more safely and there is more insight into the processes. so that, as indirect results, cost savings and rationalisation effects are to be expected. However, the cost savings achieved through the operation control system for maintenance tasks will remain modest. The truly cost-effective optimisation potentials in the maintenance area primarily consist in a reduction of preventive measures to the required scope, i.e reduction of the envisaged quantity of processes for maintenance and recurrent inspection. In order to extend savings to the organisational level, with respect to personnel expenditure, by DP supported maintenance planning, a suitable optimisation of the organisational structure and personnel employment is inevitable, because otherwise the rationalisation potentials will remain utopia. (orig.) [de

  13. Condition-based maintenance for complex systems : Coordinating maintenance and logistics planning for the process industries

    NARCIS (Netherlands)

    Olde Keizer, Minou Catharina Anselma

    2016-01-01

    Maintenance planning in the process industries is extremely complex for various reasons. Plants often run nonstop, allowing little time for performing preventive maintenance. Failures should be prevented, however, as they can lead to system downtime and high losses of revenue. Corrective maintenance

  14. Relationship Maintenance on Facebook: Development of a Measure, Relationship to General Maintenance, and Relationship Satisfaction

    Science.gov (United States)

    Dainton, Marianne

    2013-01-01

    Previous research indicates that the primary reason college students use Facebook is for relationship maintenance. The present study sought to determine the relationship between Facebook maintenance and general maintenance efforts in college student romantic relationships, as well as the impacts of such behaviors on the relationship. Survey data…

  15. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new.

  16. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Kim, Jong Kyun; Yeum, Ki Eon; Park, Myung Ku; Hong, Soon Eon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyung Sik; Lee, Won Jae; Yoon, Ki Byung; Kim, Heung Woo; Lee, In Bae; Yeom, Jeong Hyun; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Seo, Yong Chil; Yang, Song Yeul; Lee, Young Soon; Choi, Byung Kwon; Chang, Kyung Duk

    1993-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of request working to the machine shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the machine shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. 11 tabs., 3 figs. (Author) .new

  17. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new

  18. Manufacture and maintenance of laboratory equipment

    International Nuclear Information System (INIS)

    Kim, J. K.; Whang, C. K.; Lee, J. H.; Youm, K. Y.; Hong, S. H.; Choi, H. Y.; An, C.; Park, I. W.; Kim, K. S.; Lee, W. J.; Yoon, K. B.; Kim, H. W.; Lee, I. B.; Lee, C. K.; Youm, J. H.; Oho, W. H.; Choi, B. K.; Jang, K. D.

    1996-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the R and D by manufacture and maintenance of all sorts of laboratory equipment. (author). 9 tabs., 12 figs

  19. Manufacture and maintenance of laboratory equipment

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Jong Kyun; Hwang, Chang Kyu; Hwang, Bong Ha; Lee, Jong Wha; Yeom, Ki Eon; Park, Myung Ku; Hong, Soon Hyeon; Choi, Ho Young; An, Dae Kyu; An, Choon; Park, In Won; Kim, Kyeong Sik; Lee, In Bae; Yeom, Jeong Heon; Lee, Chul Ku; Sin, Keon Ju; Oh, Wan Ho; Choi, Byung Kwon; Chang, Kyeong Duk; Lee, Young Soon [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    This report on the manufacture and maintenance of laboratory equipment contains working contents, scope and contents of a request working to the Machine Shop, also records the principal production design, manufacture contents and a relevant working drawing. The working content and scope of the Machine Shop is to support the successful and convenient performance of the Research and development by manufacture and maintenance of all sorts of laboratory equipment. 12 tabs., 5 figs. (Author) .new.

  20. Predictive Maintenance and Robotic System Design

    African Journals Online (AJOL)

    pc

    2018-03-05

    Mar 5, 2018 ... Business objectives include: reduce equipment maintenance time, reduce ... Data Acquisition: Proprietary machine diagnostic systems and sensors .... and Logistics, Volume #IPart# http://www.ifac-papersonline.net,. Identifier ...

  1. Safety of nuclear operation and maintenance

    International Nuclear Information System (INIS)

    Mori, M.; Nitta, T.; Sakai, K.

    1994-01-01

    The Kansai Electric Power Co. Inc.(Kansai EPC) aims to pursue a high quality and highly reliable operation in nuclear power generation in order to ensure safety by reducing the risk of accidents and win the confidence from the society and the public. It is emphasised that in order to realize this aim manufacturers and contractors cooperate with each other in performing high quality maintenance through plant lifetime maintenance system. TQC (Total Quality Control) activity enhances the motivation for each individual to have a quality-oriented mind and cultivate the safety culture. Under the lifetime employment practice, Kansai EPC and maintenance contractors can conduct systematic education and training, and the Maintenance Training Center helps to make it effective. 6 figs

  2. Anorexia Nervosa and Bulimia: Questions and Answers for School Personnel.

    Science.gov (United States)

    Mallick, M. Joan

    1984-01-01

    School personnel can have a vital role in the early detection and treatment of anorexia nervosa and bulimia by understanding certain signs and symptoms. This article provides specific information about early detection, approaches to use when confronting the student, and methods to facilitate treatment. (Author/DF)

  3. A Review of Mercury Exposure and Health of Dental Personnel

    Directory of Open Access Journals (Sweden)

    Natasha Nagpal

    2017-03-01

    Full Text Available Considerable effort has been made to address the issue of occupational health and environmental exposure to mercury. This review reports on the current literature of mercury exposure and health impacts on dental personnel. Citations were searched using four comprehensive electronic databases for articles published between 2002 and 2015. All original articles that evaluated an association between the use of dental amalgam and occupational mercury exposure in dental personnel were included. Fifteen publications from nine different countries met the selection criteria. The design and quality of the studies showed significant variation, particularly in the choice of biomarkers as an indicator of mercury exposure. In several countries, dental personnel had higher mercury levels in biological fluids and tissues than in control groups; some work practices increased mercury exposure but the exposure levels remained below recommended guidelines. Dental personnel reported more health conditions, often involving the central nervous system, than the control groups. Clinical symptoms reported by dental professionals may be associated with low-level, long-term exposure to occupational mercury, but may also be due to the effects of aging, occupational overuse, and stress. It is important that dental personnel, researchers, and educators continue to encourage and monitor good work practices by dental professionals.

  4. Integrated Design and Approach of Building Maintenance Management in the Built Environment

    Directory of Open Access Journals (Sweden)

    Md Azree Othuman Mydin

    2017-12-01

    Full Text Available Building maintenance is such a crucial aspect in the construction industry. The construction industry is characterized as a project-based industry that delivers one of a kind products and services. Thus, building maintenance can guarantee the safety of buildings including human health and property. To some extent, it plays as a guard to supervise the buildings protecting them being suffered collapse and deterioration. The most importantly, preparing for maintenance carried out on buildings is complex and it is related to procurement system dramatically, such as design-and-build, design-build-finance operate, and the private finance initiative and public/private partnerships, all of them need to give much consideration of operational and maintenance needs and costs which are ongoing.. This paper will focus on design and approach of building maintenance management in the construction industry.

  5. Radiation Physics for Personnel and Environmental Protection

    International Nuclear Information System (INIS)

    Cossairt, J.D.

    1999-01-01

    preparation and revision of these materials. Alex Elwyn deserves special recognition for his helpful advice during the initial preparation of this work and, indeed, during his entire distinguished career at Fermilab in which he, in so many ways, has been my scientific mentor. Nancy Grossman, Kamran Vaziri, and Vernon Cupps have provided me with very constructive criticism in connection with their assistance in presenting these materials to students in the USPAS. Others whose comments have been very helpful are David Boehnlein, Kathy Graden, Paul Kesich, and Elaine Marshall. William Griffing has supported my efforts in producing the present revision. The original version of this text was presented as part of a course taught at the session of the U. S. Particle Accelerator School held at Florida State University in January 1993. Subsequently, the material was further refined and presented as a course at Fermilab in the spring of 1993 and autumn of 1994. Later, the course was presented at the USPAS sessions held at Duke University in January 1995, at the University of California in January 1997, and at Vanderbilt University in January 1999. This fourth revision represents a compilation of the work of numerous people and it is hoped that the reference citations lead the reader to the original work of those individuals who have developed this field of applied physics. Over the years, I have been greatly .enriched to have been acquainted personally with many of these fine scientists. The problems supplied with each chapter were developed with the goal of promoting better understanding of the text

  6. Gravel Roads: Maintenance and Design Manual

    Science.gov (United States)

    This manual was developed with a major emphasis on the maintenance of gravel roads, including some basic design elements. The purpose of the manual is to provide clear and helpful information for doing a better job of maintaining gravel roads.

  7. Analysis and modeling of rail maintenance costs

    Directory of Open Access Journals (Sweden)

    Amir Ali Bakhshi

    2012-01-01

    Full Text Available Railroad maintenance engineering plays an important role on availability of roads and reducing the cost of railroad incidents. Rail is of the most important parts of railroad industry, which needs regular maintenance since it covers a significant part of total maintenance cost. Any attempt on optimizing total cost of maintenance could substantially reduce the cost of railroad system and it can reduce total cost of the industry. The paper presents a new method to estimate the cost of rail failure using different cost components such as cost of inspection and cost of risk associated with possible accidents. The proposed model of this paper is used for a real-world case study of railroad transportation of Tehran region and the results have been analyzed.

  8. National Infrastructure Maintenance Strategy and its implementation

    CSIR Research Space (South Africa)

    Wall, K

    2008-10-01

    Full Text Available The National Infrastructure Maintenance Strategy (NIMS) was approved by Cabinet in 2006. This Strategy sets overarching policy for sector-based initiatives and describes the framework for a coordinated programme of actions. It is an essential part...

  9. PROMSYS, Plant Equipment Maintenance and Inspection Scheduling

    International Nuclear Information System (INIS)

    Morgan, D.L.; Srite, B.E.

    1986-01-01

    1 - Description of problem or function: PROMSYS is a computer system designed to automate the scheduling of routine maintenance and inspection of plant equipment. This 'programmed maintenance' provides the detailed planning and accomplishment of lubrication, inspection, and similar repetitive maintenance activities which can be scheduled at specified predetermined intervals throughout the year. The equipment items included are the typical pumps, blowers, motors, compressors, automotive equipment, refrigeration units, filtering systems, machine shop equipment, cranes, elevators, motor-generator sets, and electrical switchgear found throughout industry, as well as cell ventilation, shielding, containment, and material handling equipment unique to nuclear research and development facilities. Four related programs are used to produce sorted schedule lists, delinquent work lists, and optional master lists. Five additional programs are used to create and maintain records of all scheduled and unscheduled maintenance history. 2 - Method of solution: Service specifications and frequency are established and stored. The computer program reviews schedules weekly and prints, on schedule cards, instructions for service that is due the following week. The basic output from the computer program comes in two forms: programmed-maintenance schedule cards and programmed-maintenance data sheets. The data sheets can be issued in numerical building, route, and location number sequence as equipment lists, grouped for work assigned to a particular foreman as the foreman's equipment list, or grouped by work charged to a particular work order as the work-order list. Data sheets grouped by equipment classification are called the equipment classification list

  10. Plant life management and maintenance technologies for nuclear power plants

    International Nuclear Information System (INIS)

    Ikegami, Tsukasa; Aoki, Masataka; Shimura, Takao; Kaimori, Kimihiro; Koike, Masahiro

    2001-01-01

    Nuclear power generation occupying an important position for energy source in Japan and supplying about one third of total electric power usage is now required for further upgrading of its economics under regulation relaxation of electric power business. And, under execution retardation of its new planning plant, it becomes important to operate the already established plants for longer term and to secure their stability. Therefore, technical development in response to the plant life elongation is promoted under cooperation of the Ministry of Economics and Industries, electric power companies, literate, and plant manufacturers. Under such conditions, the Hitachi, Ltd. has progressed some technical developments on check inspection, repairs and maintenance for succession of the already established nuclear power plants for longer term under securing of their safety and reliability. And in future, by proposing the check inspection and maintenance program combined with these technologies, it is planned to exert promotion of maintenance program with minimum total cost from a viewpoint of its plant life. Here were described on technologies exerted in the Hitachi, Ltd. such as construction of plant maintenance program in response to plant life elongation agreeing with actual condition of each plant, yearly change mechanism grasping, life evaluation on instruments and materials necessary for maintenance, adequate check inspection, repairs and exchange, and so forth. (G.K.)

  11. Longview District Operations and Maintenance Headquarters: Environmental assessment

    International Nuclear Information System (INIS)

    1992-03-01

    Bonneville Power Administration (BPA) operations and maintenance staff are presently based at a headquarters next to the Longview Substation. These headquarters buildings, however, were built in 1941 and have deteriorated to the point of needing extensive repair. They also lack sufficient inside storage space. New buildings cannot be constructed on the site because of surrounding development. In addition, the site is within an area exposed to industrial fallout (coal tar pitch and metallic particles) that may be damaging buildings, equipment, and vehicles. BPA is concerned about the potential health risk to headquarters staff from the fallout. In light of these problems, BPA proposes to construct a new operations and maintenance headquarters at a different location, and to demolish the existing headquarters. This paper discusses the environmental impacts of the proposed action and alternatives

  12. Systematic maintenance analysis with decision support method and tool for optimizing maintenance programme

    International Nuclear Information System (INIS)

    Laakso, K.; Simola, K.; Dorrepaal, J.; Skogberg, P.

    1999-01-01

    This report describes an approach to evaluate the effectiveness of test and maintenance programs of technical systems used during several years. The method combines an analysis of the historical data on faults and repairs with an analysis of the history of periodic testing and preventive maintenance action programs. The application of the maintenance analysis from the methodological point of view in the reliability centered maintenance (RCM) project for Barsebaeck nuclear power plant is described. In order to limit the analysis resources, a method for ranking of objects for maintenance analysis is needed. Preliminary suggestions for changes in maintenance action programs are based on signals from simple maintenance indicators and qualitative analysis of underlying data on failures and maintenance. To facilitate generation of maintenance indicators, and make the maintenance analysis more efficient, a powerful and suitable data treatment tool is needed for analysis of the work order history. In the final maintenance decisions, additional decision criteria must be taken into account, and thus a more formal decision analysis is often needed for decision support. (au)

  13. LHCb Online Log Analysis and Maintenance System

    CERN Document Server

    Garnier, J-C

    2011-01-01

    History has shown, many times computer logs are the only information an administrator may have for an incident, which could be caused either by a malfunction or an attack. Due to the huge amount of logs that are produced from large-scale IT infrastructures, such as LHCb Online, critical information may be overlooked or simply be drowned in a sea of other messages. This clearly demonstrates the need for an automatic system for long-term maintenance and real time analysis of the logs. We have constructed a low cost, fault tolerant centralized logging system which is able to do in-depth analysis and cross-correlation of every log. This system is capable of handling O(10000) different log sources and numerous formats, while trying to keep the overhead as low as possible. It provides log gathering and management, Offline analysis and online analysis. We call Offline analysis the procedure of analyzing old logs for critical information, while Online analysis refer to the procedure of early alerting and reacting. ...

  14. Demonstration personnel and material tracking system at ANL-W

    International Nuclear Information System (INIS)

    Roybal, J.A.; Ortiz, S.; Henslee, S.P.

    1988-01-01

    A Personnel and Material Tracking System (PMTS) was demonstrated in the Fuel Manufacturing Facility (FMF) at Argonne National Laboratories-West (ANL-W) in July, 1987. The PMTS is intended to aid in the transfer of inventory materials from area to area within a facility such as FMF. It is also intended to assure that only those personnel who are authorized to do so may conduct these transfer operations. The PMTS Personnel Movement (PM) subsystem uses portals installed between areas to alert the system to the movement of personnel between areas. The portals are composed to two sensors, one on either side of a proximity badge reader, to detect the presence of personnel entering the portal area. However, a restricted area can be assigned to any badge holder which will cause the system to issue an alert if the badge holder passes into his/her restricted area. The PM subsystem is intended to be transparent when in use. The PMTS Inventory Material Access (IMA) subsystem provides two functions: material control and material access. The material control is provided by the Wireless Alarm Transmission of Container Handling (WATCH) system which is a sensor rf transmitter system that detects item movements. Material access is provided by the Mobile Accountability Verification Inventory Station (MAVIS) system which is a self-powered smart barcode reader

  15. TITLE III EVALUATION REPORT FOR THE MATERIAL AND PERSONNEL HANDLING SYSTEM

    International Nuclear Information System (INIS)

    T. A. Misiak

    1998-01-01

    This Title III Evaluation Report (TER) provides the results of an evaluation that was conducted on the Material and Personnel Handling System. This TER has been written in accordance with the ''Technical Document Preparation Plan for the Mined Geologic Disposal System Title III Evaluation Reports'' (BA0000000-01717-4600-00005 REV 03). The objective of this evaluation is to provide recommendations to ensure consistency between the technical baseline requirements, baseline design, and the as-constructed Material and Personnel Handling System. Recommendations for resolving discrepancies between the as-constructed system, the technical baseline requirements, and the baseline design are included in this report. Cost and Schedule estimates are provided for all recommended modifications

  16. Sustainable construction: construction and demolition waste reconsidered.

    Science.gov (United States)

    del Río Merino, Mercedes; Izquierdo Gracia, Pilar; Weis Azevedo, Isabel Salto

    2010-02-01

    Construction activity in Europe has increased substantially in the past decade. Likewise, there has also been a commensurate rise in the generation of construction and demolition waste (C&DW). This, together with the fact that in many European countries the rate of recycling and reuse of C&DW is still quite low has engendered a serious environmental problem and a motivation to develop strategies and management plans to solve it. Due to its composition, there is a significant potential to reuse and/or recycle C&DW, and thereby, contribute to improving the sustainability of construction and development, but practical procedures are not yet widely known or practiced in the construction industry. This article (a) summarizes the different applications that are presently practiced to optimize the recovery and/or application of C&DW for reuse, and (b) proposes various measures and strategies to improve the processing of this waste. The authors suggest that to enhance environmental effectiveness, a conscious and comprehensive C&DW management plan should be implemented in each jurisdiction. More precisely, this study presents a holistic approach towards C&DW management, through which environmental benefits can be achieved through the application of new construction methods that can contribute to sustainable growth.

  17. Education in logistics and training of non-logistic personnel

    Directory of Open Access Journals (Sweden)

    Marko D. Andrejić

    2011-01-01

    Full Text Available The significance of education in logistics and education and training of cadets who belong to non-logistic services (non-logistic personnel will be presented. The logistical aspects of education of non-logistic personnel are elaborated as well as the knowledge in the area of logistics which is necessary to be transferred through the educational process to non-logistic personnel for the successful accomplishment of their functional duties. A general approach and the methods of logistics education and improvement of non-logistic personnel are presented as well as the institutional prerequisites necessary for improving the quality of logistics education and training. The quality of the knowledge in this area and its implementation into the methods of thinking and decision making of non-logistic personnel affect the cooperation between the non-logistic and the logistic personnel, directly contributing to the quality of life and working conditions of units and institutions as well as to the quality and synergy in task accomplishments in the framework defined by the missions of the Army of Serbia. The necessary content and means of its transfer to cadets are discussed since they are supposed to be available at all levels and forms of education, depending on the previous cadet education levels. The theoretical bases and experiences shown are of general character and they have a universal application in the process of education. Introduction In our recent defense theory and operational practice, logistics education of non-logistic personnel is not sufficiently analyzed either in organizational or technological aspects, considering the concept and the logic of a systematic and a situational approach. The analysis of the experiences gained from operational practice shows a slight decrease in the quality of task accomplishment due to the lack of necessary logistic knowledge and habits as well as an increased communication gap between logistic and non

  18. Customer-Centered Structuring in University Libraries and Personnel Satisfaction

    Directory of Open Access Journals (Sweden)

    Erol Yılmaz

    2013-11-01

    Full Text Available Total Quality Management (TQM aims at creating a client-centered organizati- on and providing customer satisfaction. This study reviews TQM and its applica- tions in university libraries and examines employees' satisfaction with their work respectively. It was hypothesized that library personnel is not satisfıed because university libraries lack customer-centered (users and personnel structuring. Survey method was used to gather data. The questionnaire was administered to the 66 employees of Hacettepe University (HU libraries. High-level administra- tors of HU libraries were also interviewed. Data w ere analyzed using “t test” and “one-way analysis ofvariance (ANOVA”.

  19. Performing personnel dosimetry investigations and records quality assurance

    International Nuclear Information System (INIS)

    Perle, S.C.

    2002-01-01

    Radiation Safety Officers (RSOs) sometimes face situations in which personnel dosimetry estimates are required after dosimeters issued to radiation workers (film or TLD badges, extremity dosimeters, etc.) are lost or damaged before processing. This article was prepared to help those involved with personnel dosimetry investigations became aquatinted with this process. A factor that contributes to the anxiety of those unfamiliar with dosimetry investigations is the lack of published guidance available in this subject. More printed resources are needed to help radiation safety professionals familiarize themselves and understand personnel dosimetry investigations. Topics discussed in this presentation include the justification of performing dosimetry investigations, recommendations on how to perform them and the advantages of performing such investigations

  20. Radiation detectors for personnel monitoring - current developments and future trends

    International Nuclear Information System (INIS)

    Kannan, S.

    2003-01-01

    The radiation detectors for personnel monitoring range from the conventional passive dosimeters like the film badge and the TLD, to sophisticated active dosimeters for integrated gamma, beta and neutron dose measurement. With the availability of high accuracy active dosimeters, the process of personnel monitoring, acceptability among radiation workers, record keeping and dose control have become more simplified. However the high level of sophistication in the active dosimeter has its own inevitable price tag and the new breed of active dosimeters are prohibitively costly. The silver lining, in the otherwise dark cost scenario of these dosimeters is the potential for cost reduction at least in some of the dosimeters in the near future

  1. Nuclear power plant personnel training and its evaluation. A guidebook. Executive summary

    International Nuclear Information System (INIS)

    1997-05-01

    The Guidebook will prove especially useful for, and is addressed primarily to: nuclear power operating organizations establishing or upgrading their NPP personnel training systems; regulatory personnel responsible for setting requirements and/or evaluating NPP personnel training; and organizations (within or outside the operating organization) responsible for the development, implementation and evaluation of training programmes for NPP personnel. Figs

  2. Building 9401-2 Plating Shop Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1999-01-01

    This document provides a plan for implementing surveillance and maintenance (S and M) activities to ensure that Building 9401-2 Plating Shop is maintained in a cost effective and environmentally secure configuration until subsequent closure during the final disposition phase of decommissioning. U.S. Department of Energy (DOE) G430.1A-2, Surveillance and Maintenance During Facility Disposition (1997), was used as guidance in the development of this plan. The S and M Plan incorporates DOE O 430.1A, Life Cycle Asset Management (LCAM) (1998a) direction to provide for conducting surveillance and maintenance activities required to maintain the facility and remaining hazardous and radioactive materials, wastes, and contamination in a stable and known condition pending facility disposition. Recommendations in the S and M plan have been made that may not be requirement-based but would reduce the cost and frequency of surveillance and maintenance activities. During the course of S and M activities, the facility's condition may change so as to present an immediate or developing hazard or unsatisfactory condition. Corrective action should be coordinated with the appropriate support organizations using the requirements and guidance stated in procedure Y10-202, Rev. 1, Integrated Safety Management Program, (Lockheed Martin Energy Systems, Inc. (LMES), 1998a) implemented at the Oak Ridge Y-12 Plant and the methodology of the Nuclear Operations Conduct of Operations Manual (LMES, 1999) for the Depleted Uranium Operations (DUO) organization. The key S and M objectives applicable to the Plating Shop are to: Ensure adequate containment of remaining residual material in exhaust stacks and outside process piping, stored chemicals awaiting offsite shipment, and items located in the Radioactive Material Area (RMA); Provide access control into the facility and physical safety to S and M personnel; Maintain the facility in a manner that will protect the public, the environment, and the S

  3. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-02-28

    Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications.

  4. Generation IV Nuclear Energy Systems Construction Cost Reductions through the Use of Virtual Environments - Task 4 Report: Virtual Mockup Maintenance Task Evaluation

    International Nuclear Information System (INIS)

    Timothy Shaw; Anthony Baratta; Vaughn Whisker

    2005-01-01

    Task 4 report of 3 year DOE NERI-sponsored effort evaluating immersive virtual reality (CAVE) technology for design review, construction planning, and maintenance planning and training for next generation nuclear power plants. Program covers development of full-scale virtual mockups generated from 3D CAD data presented in a CAVE visualization facility. This report focuses on using Full-scale virtual mockups for nuclear power plant training applications

  5. Employment and winter construction

    DEFF Research Database (Denmark)

    Hansen, Ernst Jan de Place; Larsen, Jacob Norvig

    2011-01-01

    Reduced seasonal building activity in the construction sector is often assumed to be related to hard winter conditions for building activities and poor working conditions for construction workers, resulting in higher costs and poor quality of building products, particularly in the northern hemisp...... of contracts for workers is more likely to explain differences in seasonal activity than climatic or technological factors....

  6. 9 CFR 318.310 - Personnel and training.

    Science.gov (United States)

    2010-01-01

    ... Section 318.310 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE AGENCY ORGANIZATION AND TERMINOLOGY; MANDATORY MEAT AND POULTRY PRODUCTS INSPECTION AND VOLUNTARY... Canning and Canned Products § 318.310 Personnel and training. All operators of thermal processing systems...

  7. Planning and management support for NPP personnel SAT-based training programmes. IAEA regional workshop. Working material

    International Nuclear Information System (INIS)

    1998-01-01

    Within the European regional TC Project a workshop on Planning and Management Support for NPP Personnel SAT Based Training programmes was held at the Paks NPP Maintenance Training Centre in June 1998. It was organized jointly by IAEA and the Paks NPP. The objective of the workshop was to present the important experience gained by successful implementation of the IAEA Model Project on Strengthening Training for Safe Operation at Paks NPP as well as international experience in developing and carrying out the projects to upgrade NPP personnel training in particular maintenance training, and competence based Systematic Approach to Training (SAT). Twenty five participants from Armenia, Bulgaria, China, Czech republic, Hungary, Romania, Russia, Slovak Republic and Ukraine attended the workshop presenting and exchanging experiences in implementing NPP SAT-based training programmes

  8. Hiring and keeping qualified personnel in a growing regulatory organisation

    International Nuclear Information System (INIS)

    Marchildon, P.

    1993-01-01

    Although no new nuclear stations are currently committed in Canada, the regulatory authority, the Atomic Energy Control Board (AECB), has started, in 1989, an expansion program which, when completed in 1994 will represent a 60 pc increase in its workforce. The new personnel resources are being used to improve the AECB effectiveness in a number of regulatory activities. This paper reviews some of the key factors which relate to the hiring and integration of the new AECB employees: selection process, timing, fees, scholarship program, subsequent training of qualified personnel, woman quotas. 2 figs

  9. 9 CFR 381.310 - Personnel and training.

    Science.gov (United States)

    2010-01-01

    ... INSPECTION AND CERTIFICATION POULTRY PRODUCTS INSPECTION REGULATIONS Canning and Canned Products § 381.310... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Personnel and training. 381.310 Section 381.310 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE...

  10. Performance-based inspection and maintenance strategies

    International Nuclear Information System (INIS)

    Vesely, W.E.

    1995-01-01

    Performance-based inspection and maintenance strategies utilize measures of equipment performance to help guide inspection and maintenance activities. A relevant measure of performance for safety system components is component unavailability. The component unavailability can also be input into a plant risk model such as a Probabilistic Risk Assessment (PRA) to determine the associated plant risk performance. Based on the present and projected unavailability performance, or the present and projected risk performance, the effectiveness of current maintenance activities can be evaluated and this information can be used to plan future maintenance activities. A significant amount of information other than downtimes or failure times is collected or can be collected when an inspection or maintenance is conducted which can be used to estimate the component unavailability. This information generally involves observations on the condition or state of the component or component piecepart. The information can be detailed such as the amount of corrosion buildup or can be general such as the general state of the component described as ' high degradation', ' moderate degradation', or ' low degradation'. Much of the information collected in maintenance logs is qualitative and fuzzy. As part of an NRC Research program on performance-based engineering modeling, approaches have been developed to apply Fuzzy Set Theory to information collected on the state of the component to determine the implied component or component piecepart unavailability. Demonstrations of the applications of Fuzzy Set Theory are presented utilizing information from plant maintenance logs. The demonstrations show the power of Fuzzy Set Theory in translating engineering information to reliability and risk implications

  11. 14 CFR 142.13 - Management and personnel requirements.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Management and personnel requirements. 142... (CONTINUED) SCHOOLS AND OTHER CERTIFICATED AGENCIES TRAINING CENTERS General § 142.13 Management and... curriculum leading to airman certificates or ratings, or both; (c) The training center has, and shall...

  12. Summary of NPP personnel training in Czech Republic

    International Nuclear Information System (INIS)

    1996-01-01

    The preparation of NPP personnel is one of the most important phases of the process of construction, commissioning, operation and maintenance of nuclear power facilities. The objective is to improve personnel abilities so that they would be able to assure reliable, safe and economic operation of these facilities with high investment costs. It is the purpose of Nuclear Training Centre Brno (NTC Brno) to provide training and services which are responsive to the technological demands and emerging educational standards and criteria of the NPP and the nuclear industry. Fulfilling this purpose is a challenging task. The staff of NTC Brno, in a joint effort with NPP Dukovany and NPP Temelin, has responded to the challenge with comprehensive programs aimed at meeting customers needs. The programs are broadly based, yet flexible so that they can incorporate specific customer requirements

  13. School Personnel-Student Racial Congruence and the Achievement Gap

    Science.gov (United States)

    Moore, Allison B.; MacGregor, Cynthia; Cornelius-White, Jeffrey

    2017-01-01

    Purpose: This paper aims to examine the relationship between student achievement and racial congruence of school personnel and students to help educators and policy makers narrow the achievement gap. Design/methodology/approach: This quasi-experimental, correlational study used publicly available data from 158 elementary schools in the Houston…

  14. Leadership Style and Job Commitment of Library Personnel in ...

    African Journals Online (AJOL)

    The main purpose of this study is to examine the relationship between leadership style and job commitment of library personnel in private universities in the Southwest, Nigeria. The research instrument used in the collection of data was questionnaire. In measuring the research questions and testing hypotheses, mean and ...

  15. PROBLEMS AND PROMISE IN THE USE OF INDIGENOUS PERSONNEL.

    Science.gov (United States)

    OTIS, JACK

    A SIGNIFICANT EXPANSION OF AUXILIARY PERSONNEL WILL BE CAUSED BY THE SOCIAL WORK MANPOWER SHORTAGE, THE ELIMINATION OF ROUTINE BLUE AND WHITE COLLAR JOBS BY AUTOMATION AND CYBERNATION, THE INCREASE IN NEW WORKERS IN A DECLINING LABOR MARKET FOR THE UNSKILLED AND THE SEMI-SKILLED, THE GROWTH OF FEDERAL PROGRAMS WHICH FUND THE ESTABLISHMENT OF NEW…

  16. Manual on training, qualification and certification of quality assurance personnel

    International Nuclear Information System (INIS)

    1986-01-01

    The Manual is applicable to those participants in a nuclear power project who are associated with establishment and implementation of the various quality assurance (QA) programmes during the life cycle of the project. It provides examples of typical QA functions to be undertaken and the associated qualification requirements, training programmes, training techniques and methods of certification of personnel implementing these functions. The necessary qualification and training requirements and practices for QA personnel are dependent primarily on the functions or activities to be performed. The two main functions of the QA unit noted previously as (a) ensuring QA programme establishment and execution and (b) verifying that activities have been correctly performed have been found in practice to require different qualifications and training of personnel. Therefore, for the purpose of this Manual the QA personnel may be classified in two groups who perform: QA programmatic and evaluation functions; Inspection and test functions. These titles do not necessarily represent separate or individual organizational groups or units and may be composed of one or of several different organizations

  17. Road Maintenance in Africa: Approaches and Perspectives

    Directory of Open Access Journals (Sweden)

    M Mostafa Hassan

    2018-01-01

    Full Text Available In Africa, roads are the dominant mode of passenger and freight transport, for which the need is growing rapidly. It is noticeable that most of the African countries do not do enough to ensure the sustainability of road infrastructure as it has been widely reported that roads are affected, to varying degrees, by premature deterioration. Most of the African countries have adopted institutional reforms, notably entailing the creation of road funds and road agencies, and made significant progress on road maintenance. However, many challenges remain to be addressed in all of them to ensure appropriate maintenance. Although spending on road maintenance has increased over time in all African countries it remains insufficient to cover the needs. Poorly maintained roads constrain mobility, significantly raise vehicle operating costs, increase accident rates and their associated human and property costs, and aggravate isolation, poverty, poor health, and illiteracy in rural communities. This paper focuses, in particular, on road maintenance in some African countries considering types of road maintenance and the different approaches aiming at a comparison to reflect on similarities and differences.

  18. Road Maintenance in Africa: Approaches and Perspectives

    Science.gov (United States)

    M, Mostafa Hassan

    2018-06-01

    In Africa, roads are the dominant mode of passenger and freight transport, for which the need is growing rapidly. It is noticeable that most of the African countries do not do enough to ensure the sustainability of road infrastructure as it has been widely reported that roads are affected, to varying degrees, by premature deterioration. Most of the African countries have adopted institutional reforms, notably entailing the creation of road funds and road agencies, and made significant progress on road maintenance. However, many challenges remain to be addressed in all of them to ensure appropriate maintenance. Although spending on road maintenance has increased over time in all African countries it remains insufficient to cover the needs. Poorly maintained roads constrain mobility, significantly raise vehicle operating costs, increase accident rates and their associated human and property costs, and aggravate isolation, poverty, poor health, and illiteracy in rural communities. This paper focuses, in particular, on road maintenance in some African countries considering types of road maintenance and the different approaches aiming at a comparison to reflect on similarities and differences.

  19. Embracing Safe Ground Test Facility Operations and Maintenance

    Science.gov (United States)

    Dunn, Steven C.; Green, Donald R.

    2010-01-01

    Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

  20. The health and cost implications of high body mass index in Australian defence force personnel

    Directory of Open Access Journals (Sweden)

    Peake Jonathan

    2012-06-01

    Full Text Available Abstract Background Frequent illness and injury among workers with high body mass index (BMI can raise the costs of employee healthcare and reduce workforce maintenance and productivity. These issues are particularly important in vocational settings such as the military, which require good physical health, regular attendance and teamwork to operate efficiently. The purpose of this study was to compare the incidence of injury and illness, absenteeism, productivity, healthcare usage and administrative outcomes among Australian Defence Force personnel with varying BMI. Methods Personnel were grouped into cohorts according to the following ranges for (BMI: normal (18.5 − 24.9 kg/m2; n = 197, overweight (25–29.9 kg/m2; n = 154 and obese (≥30 kg/m2 with restricted body fat (≤28% for females, ≤24% for males (n = 148 and with no restriction on body fat (n = 180. Medical records for each individual were audited retrospectively to record the incidence of injury and illness, absenteeism, productivity, healthcare usage (i.e., consultation with medical specialists, hospital stays, medical investigations, prescriptions and administrative outcomes (e.g., discharge from service over one year. These data were then grouped and compared between the cohorts. Results The prevalence of injury and illness, cost of medical specialist consultations and cost of medical scans were all higher (p  Conclusions High BMI in the military increases healthcare usage, but does not disrupt workforce maintenance. The greater prevalence of injury and illness, greater healthcare usage and lower productivity in obese Australian Defence Force personnel is not related to higher levels of body fat.

  1. Walter Dill Scott and the Student Personnel Movement

    Science.gov (United States)

    Biddix, J. Patrick; Schwartz, Robert A.

    2012-01-01

    Walter Dill Scott (1869-1955), tenth president of Northwestern University and pioneer of industrial psychology, is an essential architect of student personnel work. This study of his accomplishments, drawing on records from the Northwestern University archives, tells a story about the people he influenced and his involvement in codifying what was…

  2. Air Force Integrated Personnel and Pay System (AFIPPS)

    Science.gov (United States)

    2016-03-01

    Technical Guidance to include Information Technolgy (IT) Standards identified in the Technical View One (1) (TV-1) and implementation guidance of GIG...Compliant with Global Information Grid (GIG) Technical Guidance to include Information Technolgy (IT) Standards identified in the Technical View One...2016 Major Automated Information System Annual Report Air Force Integrated Personnel and Pay System (AFIPPS) Defense Acquisition Management

  3. Psychological help and psychoprophilaxis for the SRF personnel

    International Nuclear Information System (INIS)

    Kurochka, V.K.; Zhur, M.M.; Ratanov, Yu.Z.; Olejnik, S.I.

    1998-01-01

    Due to the growth of mental disorders in military personnel of strategic rocket forces the combined approach is considered to solving this problem connected with occupational exposure to ionizing radiation and electromagnetic radiation as well as to missile fuel. System for the psychoprophilactic measures and psychiatric help is discussed [ru

  4. Personnel shift assignment: Existence conditions and network models

    NARCIS (Netherlands)

    van den Berg, Jeroen P.; van den Berg, J.P.; Panton, David M.

    1994-01-01

    The personnel scheduling problem is known to be a five-stage process in which the final stage involves the assignment of shifts to the days worked in the schedule. This paper discusses the existence conditions for both continuous and forward rotating shift assignments and heuristic network

  5. Youth and Tattoos: What School Health Personnel Should Know.

    Science.gov (United States)

    Brown, Kelli McCormack; Perlmutter, Paula; McDermott, Robert J.

    2000-01-01

    The recent proliferation of tattooing has prompted increased concern for safety and awareness of hazardous conditions. Transmission of infectious diseases can occur when proper sterilization and safety procedures are not followed. Adolescents are a critical high-risk group that need the attention of school health personnel to help them become…

  6. Personnel Recruitment and Retention in Rural America: A Growing Problem.

    Science.gov (United States)

    Helge, Doris I.; Marrs, Lawrence W.

    1982-01-01

    The article presents successful strategies based on A. Maslow's hierarchy for recruiting special education personnel for rural school systems. Techniques for selling a district to prospective teachers and administrators are discussed and suggestions for integrating newcomers are covered. (Author/SB)

  7. The workplace satisfaction of Romania’s medical personnel in state and public institutions

    Directory of Open Access Journals (Sweden)

    Ghenu Cristina

    2017-07-01

    Full Text Available Nowadays the Romanian medical system is facing changes in terms of qualified personnel. Each year a great number of doctors decide to leave Romania in order to conduct practice in other countries with better working conditions. In this situation where doctors are no longer pleased to work in Romanian institutions, can we question the quality of their working environment? This study aims to determine the workplace satisfaction of Romania’s medical personnel currently working in private as well as state healthcare institutions. In this process, the study also discloses the inside image of Romanian medical units concerning the quality of the working environment, the quality of communications between subordinates belonging to the same section as well as their relations with their „direct superior”, „hierarchic superior” and „senior management”. To construct the current research, Romanian medical personnel completed a survey in order to determine their knowledge and judgment regarding their working environment. The research implied two phases: the first phase lasted one month and a half during which 100 medical personnel from a public hospital were selected to answer a survey; the second phase followed and it targeted the application of the same questions on 100 medical personnel working in a private institution. The survey comprised situations of everyday life in which any employee can be found. The results reveal the present situation of Romanian medical personnel, how often, despite of their unpleasant working conditions, they are forced to give their best in order to provide the quality medical treatment that any patient is entitled to. Therefore, the findings (1 reveal the inside image of Romanian hospital’s system and (2 offer an empirical foundation for subsequent research and improvement of working environments in Romanian hospitals.

  8. Work environment, overtime and sleep among offshore personnel.

    Science.gov (United States)

    Parkes, Katharine R

    2017-02-01

    Personnel working on North Sea oil/gas installations are exposed to remote and potentially hazardous environments, and to extended work schedules (typically, 14×12h shifts). Moreover, overtime (additional to the standard 84-h week) is not uncommon among offshore personnel. Evidence from onshore research suggests that long work hours and adverse environmental characteristics are associated with sleep impairments, and consequently with health and safety risks, including accidents and injuries. However, little is known about the extent to which long hours and a demanding work environment combine synergistically in relation to sleep. The present study sought to address this issue, using survey data collected from offshore day-shift personnel (N=551). The multivariate analysis examined the additive and interactive effects of overtime and measures of the psychosocial/physical work environment (job demands, job control, supervisor support, and physical stressors) as predictors of sleep outcomes during offshore work weeks. Control variables, including age and sleep during leave weeks, were also included in the analysis model. Sleep duration and quality were significantly impaired among those who worked overtime (54% of the participants) relative to those who worked only 12-h shifts. A linear relationship was found between long overtime hours and short sleep duration; personnel who worked >33h/week overtime reported job demands, and positively related to supervisor support, only among personnel who worked overtime. Poor sleep quality was predicted by the additive effects of overtime, low support and an adverse physical environment. These findings highlight the need to further examine the potential health and safety consequences of impaired sleep associated with high overtime rates offshore, and to identify the extent to which adverse effects of overtime can be mitigated by favourable physical and psychosocial work environment characteristics. Copyright © 2015 Elsevier Ltd

  9. Working conditions and health of personnel dealing with ionizing radiation sources

    International Nuclear Information System (INIS)

    Gus'kova, A.K.

    1978-01-01

    Analyzed are the results of investigations dedicated to evaluation of working and health conditions of personnel engaged at powerful charged-particle accelerators, in the production of radionuclides, different stages of mining and enrichment of pyrochlore ore, maintenance of radio engineering and radio-physical equipment, those engaged on geological and geophysical research, operators of control desks and apparatuses at nuclear reactors. Observation of separate people has been carried out in control groups numbering 200-250 people. It has been found that the annual levels of irradiation doses are not in excess of maximum permissible doses (MPD), however in cases of long work service the total dose amounts to 150 rem (for 15-20 years). Changes in personnel health conditions are analyzed as dependent on the total irradiation dose. Apart from irradiation, the personnel health is also affected by other factors, specifically: unfavorable meteofactors, working regime etc. Specialized medical control was found to be inexpedient for people whose irradiation level was 1/3 of MPD. However for people whose irradiation level ranges from 1/3 to 1 MPD it is advisable to keep the current volume of oriented medical observation. A special attention in this case should be given to control systems, bronchopulmonary system and the state of cutaneous covering depending on the character of irradiation effects. Problems requiring further comprehensive studies are enumerated

  10. A Planned Preventive Maintenance Program. A Handbook for Chief Business Officers and Supervisors of Maintenance with Suggestions on Maintenance for Consideration by Presidents of Higher Institutions.

    Science.gov (United States)

    Daniel, Clarence H.

    This handbook explains planned preventive maintenance program, which is an operational system of maintenance designed to increase the effectiveness of the maintenance staff and the use of maintenance funds through efficient scheduling of inspections and follow-through of work to be performed. Sections are included for the chief administrative…

  11. Upgrade of maintenance technologies of Nuclear Power Plants

    International Nuclear Information System (INIS)

    Kamada, Kazuaki

    2005-01-01

    In order to enhance long-term safe and stable operation of Ikata Nuclear Power Plants (NPPs) in more efficient way, maintenance technology upgrade project was started aiming at establishment of simplified and efficient self-maintenance system with affiliated companies. Maintenance technique and supervisor qualification system was introduced after improvement and reinforcement of personnel education and training. Reflecting investigation of maintenance activities of US NPPs and productivity improvement in other industries, preventive maintenance optimization project had been performed such as introduction of key performance indicator (KPI), new system incorporating reliability-centered maintenance (RCM) and condition-based maintenance (CBM), and on-line monitoring and maintenance (OLM) based on risk assessment. Enterprise asset management (EAM) to establish information data base and total productive maintenance (TPM) action for every personnel to participate in self-maintenance was also introduced. (T. Tanaka)

  12. Personnel Preparation.

    Science.gov (United States)

    Fair, George, Ed.; Stodden, Robert, Ed.

    1981-01-01

    Three articles comprise a section on personnel preparation in vocational education. Articles deal with two inservice programs in career/vocational education for the handicapped and a project to train paraprofessionals to assist special educators in vocational education. (CL)

  13. Number of on-site personnel and their functions

    International Nuclear Information System (INIS)

    Recker, M.

    1986-01-01

    After the definition of the general tasks, the development of an organization chart for on-site personnel is shown, the number and qualifications are indicated relating to the specific jobs. The functions of the different people are explained in detail. (orig.)

  14. NPP safety and personnel training. XII International conference. Abstracts

    International Nuclear Information System (INIS)

    2011-01-01

    The 12th International conference NPP Safety and Personnel Training took place in Obninsk, October 4-7, 2011. The issues of nuclear technologies safety are considered.The problems of life-cycle management of nuclear facilities are discussed. The criteria of assessment of physical protection systems of nuclear facilities are presented [ru

  15. Personnel training in commercial organizations: problems and ways forward

    Directory of Open Access Journals (Sweden)

    Е А Zakablutskaya

    2010-09-01

    Full Text Available The article provides a snapshot of the typical problems facing commercial organizations in the course of personnel training system development. A comparison between «pre-crisis» and «post-crisis» training models is made. The ways to solve the existing problems are also analyzed in this very item.

  16. Construction and Demolition Waste

    DEFF Research Database (Denmark)

    Christensen, Thomas Højlund; Andersen, L.

    2011-01-01

    Construction and demolition waste (C&D waste) is the waste generated during the building, repair, remodeling or removal of constructions. The constructions can be roads, residential housing and nonresidential buildings. C&D waste has traditionally been considered without any environmental problems...... should be managed accordingly. Another reason is that it has been documented that a large fraction of C&D waste (about 90 %) can be easily recycled and thus can conserve landfill capacity. C&D waste may conveniently be divided into three subcategories: Buildings, roads and excavations. This chapter...

  17. Managed maintenance, the next step in power plant maintenance

    International Nuclear Information System (INIS)

    Butterworth, G.; Anderson, T.M.

    1984-01-01

    The Westinghouse Nuclear Services Integration Division managed maintenance services are described. Essential to the management and control of a total plant maintenance programme is the development of a comprehensive maintenance specification. During recent years Westinghouse has jointly developed total plant engineering-based maintenance specifications with a number of utilities. The process employed and the experience to date are described. To efficiently implement the maintenance programme Westinghouse has developed a computer software program specifically designed for day to day use at the power plant by maintenance personnel. This program retains an equipment maintenance history, schedules maintenance activities, issues work orders and performs a number of sophisticated analyses of the maintenance backlog and forecast, equipment failure rates, etc. The functions of this software program are described and details of Westinghouse efforts to support the utilities in reducing outage times through development of predefined outage plans for critical report maintenance activities are given. Also described is the experience gained in the training of specialized maintenance personnel, employing competency-based training techniques and equipment mock-ups, and the benefits experienced, in terms of improved quality and productivity of maintenance performed. The success experienced with these methods has caused Westinghouse to expand the use of these training techniques to the more routine skill areas of power plant maintenance. A significant reduction in the operating costs of nuclear power plants will only be brought about by a significant improvement in the quality of maintenance. Westinghouse intends to effect this change by expanding its international service capabilities and to make major investments in order to promote technological developments in the area of power plant maintenance. (author)

  18. Underwater fuel handling equipment maintenance. Verification of design assumptions, specific problems and tools, case study

    International Nuclear Information System (INIS)

    Kurek, J.B.

    1995-01-01

    The majority of CANDU Fuel Transfer System equipment at Pickering is located under fourteen feet of water, as dictated by the containment and shielding requirements. Such arrangement, however, creates specific problems with equipment maintenance. Each single piece of equipment serves two generating units, which means in case of defect- double losses on production, or two units shut down simultaneously for planned maintenance. The requirement for underwater maintenance was not anticipated at the design stage, which multiples the level of difficulty, and creates requirement for developing special tools for each work. Removal of the damaged fuel from the receiving bays and decontamination of submerged equipment is also part of the problem. The purpose of this presentation is to share our experience with the designers, operators, maintenance mechanics and technical personnel of the other CANDU generating stations

  19. Maintenance and management of refills NPP Cofrentes

    International Nuclear Information System (INIS)

    Salar, J.; Blanquer, N.

    2014-01-01

    Maintenance in a nuclear power plant is a discipline that requires considering multiple criteria. Many risks can be involved during the jobs execution, and the preparation of activities needs an important knowledge and experience. During outages, many pieces of equipment are reviewed and inspected, and there is a huge increase of the number of risks and variables needed to perform and adequate preparation, coordination and execution of the maintenance activities. Cofrentes Nuclear Power Plant has improved the Outage preparation organization, in order to get more people involved, and make sure that all the critical parameters have been considered for each outage work. (Author)

  20. Ship construction and welding

    CERN Document Server

    Mandal, Nisith R

    2017-01-01

    This book addresses various aspects of ship construction, from ship types and construction materials, to welding technologies and accuracy control. The contents of the book are logically organized and divided into twenty-one chapters. The book covers structural arrangement with longitudinal and transverse framing systems based on the service load, and explains basic structural elements like hatch side girders, hatch end beams, stringers, etc. along with structural subassemblies like floors, bulkheads, inner bottom, decks and shells. It presents in detail double bottom construction, wing tanks & duct keels, fore & aft end structures, etc., together with necessary illustrations. The midship sections of various ship types are introduced, together with structural continuity and alignment in ship structures. With regard to construction materials, the book discusses steel, aluminum alloys and fiber reinforced composites. Various methods of steel material preparation are discussed, and plate cutting and form...

  1. ATLAS Maintenance and Operation management system

    CERN Document Server

    Copy, B

    2007-01-01

    The maintenance and operation of the ATLAS detector will involve thousands of contributors from 170 physics institutes. Planning and coordinating the action of ATLAS members, ensuring their expertise is properly leveraged and that no parts of the detector are understaffed or overstaffed will be a challenging task. The ATLAS Maintenance and Operation application (referred to as Operation Task Planner inside the ATLAS experiment) offers a fluent web based interface that combines the flexibility and comfort of a desktop application, intuitive data visualization and navigation techniques, with a lightweight service oriented architecture. We will review the application, its usage within the ATLAS experiment, its underlying design and implementation.

  2. Planning and control of maintenance systems modelling and analysis

    CERN Document Server

    Duffuaa, Salih O

    2015-01-01

    Analyzing maintenance as an integrated system with objectives, strategies and processes that need to be planned, designed, engineered, and controlled using statistical and optimization techniques, the theme of this book is the strategic holistic system approach for maintenance. This approach enables maintenance decision makers to view maintenance as a provider of a competitive edge not a necessary evil. Encompassing maintenance systems; maintenance strategic and capacity planning, planned and preventive maintenance, work measurements and standards, material (spares) control, maintenance operations and control, planning and scheduling, maintenance quality, training, and others, this book gives readers an understanding of the relevant methodology and how to apply it to real-world problems in industry. Each chapter includes a number exercises and is suitable as a textbook or a reference for a professionals and practitioners whilst being of interest to industrial engineering, mechanical engineering, electrical en...

  3. Construction, fabrication, and installation

    International Nuclear Information System (INIS)

    1992-05-01

    This standard specifies the construction, fabrication, and installation requirements that apply to concrete containment structures of a containment system designated as class containment components, parts and appurtenances for nuclear power plants

  4. Construction and material specification

    Science.gov (United States)

    2002-01-01

    These Construction and Material Specifications are written to the Bidder before award of the : Contract and to the Contractor after award of the Contract. The sentences that direct the Contractor to perform Work are written as commands. For example, ...

  5. Using heuristic search for optimizing maintenance plans

    International Nuclear Information System (INIS)

    Mutanen, Teemu

    2012-01-01

    This work addresses the maintenance action selection process. Maintenance personnel need to evaluate maintenance actions and costs to keep the machines in working condition. Group of actions are evaluated together as maintenance plans. The maintenance plans as output provide information to the user about which actions to take if any and what future actions should be prepared for. The heuristic search method is implemented as part of general use toolbox for analysis of measurements from movable work machines. Impacts from machine's usage restrictions and maintenance activities are analysed. The results show that once put on a temporal perspective, the prioritized order of the actions is different and provide additional information to the user.

  6. Valve leakage inspection testing and maintenance process

    International Nuclear Information System (INIS)

    Aikin, J.A.; Reinwald, J.W.; Kittmer, C.A.

    1991-01-01

    In valve maintenance, packing rings that prevent leakage along the valve stem must periodically be replaced, either during routine maintenance or to correct a leak or valve malfunction. Tools and procedures currently in use for valve packing removal and inspection are generally of limited value due to various access and application problems. A process has been developed by AECL Research that addresses these problems. The process, using incompressible fluid pressure, quickly and efficiently confirms the integrity of the valve backseat, extracts hard-to-remove valve packing sets, and verifies the leak tightness of the repacked valve

  7. Food allergy knowledge and attitude of restaurant personnel in Turkey.

    Science.gov (United States)

    Sogut, Ayhan; Kavut, Ayşe Baççıoğlu; Kartal, İbrahim; Beyhun, Ercument Nazim; Çayır, Atilla; Mutlu, Mehmet; Özkan, Behzat

    2015-02-01

    The incidence of food-induced allergic reactions is gradually increasing. Most of these allergic reactions occur in restaurants. Therefore, this study aims to investigate the awareness of restaurant personnel about food allergy. The training, knowledge levels on food allergy, and comfort level in providing safe food of 351 restaurant personnel in Erzurum Province, Turkey, were assessed through a face-to-face survey. Among the participants, 81.5% were male (mean age 28.5 ± 8.5 years). Among them, 17.1% were chefs, 11.1% managers, 5.7% owners, and 66.1% waiters. Food allergy training was reported by 17.1% of the participants. The rates of restaurant personnel who gave the correct answers to the 4 questionnaire items, "Customers with food allergies can safely consume a small amount of that food/Food allergic reaction can cause death/If a customer is having an allergic reaction, it is appropriate to immediately serve them water to 'dilute' the allergen/Removing an allergen from a finished meal (eg, taking off nuts) may be all that is necessary to provide a safe meal for an allergic customer," which measure food allergy knowledge levels, were 46.4%, 65.7%, 55.0%, and 65.7%, respectively. According to our study, there are gaps in the food allergy knowledge of restaurant personnel. Because preparing and serving safe meals to patients with food allergy in restaurants is important, the training of restaurant personnel in food allergy is necessary. © 2014 ARS-AAOA, LLC.

  8. Maintenance and repair tools of the 900 MW PWR units in France

    International Nuclear Information System (INIS)

    Blary, F.; Castaing, C.; Hassig, J.

    1985-01-01

    EDF and FRAMATOME have developed special tools and, repair and maintenance procedures to decrease the unavailability of the PWR units and the dosimetry of the personnel of maintenance. This report presents the solution adopted to face the problem of replacement of the internal upper structure pins of 21 units: 1) study and realisation of important industrial means; 2) development of a strategy: the pin replacement is separated from the guide tube replacement by the creation of a pin replacement shop, and, as often as it is possible, the ''AQUARIUM'' method allows to replace the guide-tubes with the aid of a mobile pool called AQUARIUM outside the critical way of shutdown [fr

  9. Role of the State Office for Nuclear Safety in testing special professional competence of selected personnel of nuclear facilities and selected personnel handling ionizing radiation sources

    International Nuclear Information System (INIS)

    Kovar, P.

    2003-01-01

    The laws and regulations governing the title topic are identified. The following terms are defined and their context highlighted: professional competence; special professional competence; selected personnel; requirements for selected personnel; requirements for selected personnel training; examination boards; and licensing procedure. (P.A.)

  10. Personnel neutron dosimeter evaluation and upgrade program

    International Nuclear Information System (INIS)

    Fix, J.J.; Brackenbush, L.W.; McDonald, J.C.; Roberson, P.L.; Holbrook, K.L.; Endres, G.W.R.; Faust, L.G.

    1983-01-01

    Evaluation of neutron dosimeters from twelve DOE laboratories involved about 2500 dosimeter irradiations at both PNL and the National Bureau of Standards (NBS) using neutrons of several energies and doses and several irradiations for good statistical analysis. The data and their analyses will be published later. The information evaluates accuracy, precision, lower dose detection, and energy response of dosimeters

  11. Optimal maintenance work organization and technical education

    International Nuclear Information System (INIS)

    Toshiro Kitamura

    2005-01-01

    Under Japanese multi-layered maintenance routines, almost 100% of work is delegated to outside contractors. For taking such form, there are several reasons unique to Japan. U.S. maintenance work organization makes a contrast, reducing the volume of subcontract in these past ten years. On the other hand, France has a trend of increasing the volume of subcontract for cost reduction that is expected in liberalization and privatization. In Japan, since the subcontract went too far, there is a trend that the multi-layered subcontract structure will be relieved. The Japan Atomic Power, Inc., has organized a team that performs a part of maintenance work by employees themselves since three years before. Direct work is effective to greatly supporting the employees' technical ability. It is expected that the quality of subcontract management will be markedly improved from now on. (author)

  12. Ticks and Tickborne Diseases Affecting Military Personnel

    Science.gov (United States)

    1989-09-01

    from trochanters, palpal articles 3 with distinct dorsal spine ; palpal articles 2 and 3 not equal. Remarks: According to Harwood and James (1979), humans...Hy. asiaticum parasitize all domestic animals, especially camels, cattle, horses, and sheep. People, hares, boars, and hedgehogs are less frequently...attacked. Immatures feed on hedgehogs , rodents, hares, cats, and dogs. 85 A B Figure 36. Female (a) and male (b) Hyalomma asiaticum. Seasonality: This

  13. Evoked Brain Activity and Personnel Performance

    Science.gov (United States)

    1987-10-01

    Shucard and Horn (1972), Galbraith, Gliddon, and Busk (1970), and Callaway (1975), the latter using Navy recruits. Callaway’s own work was reported at...G.C., Gliddon, J.B., & Busk , J. (1970). Visual evoked responses in mentally retarded and nonretarded subjects. American Journal of Mental Deficiency

  14. Qualification and training of quality assurance personnel

    International Nuclear Information System (INIS)

    Ribeiro da Costa, J.

    1980-01-01

    Introduction. Qualification and certification: definitions; approach of the problem. A first attempt for its solutions. The 'sample' course; results and conclusions. Planning a comprehensive program: results. Analysis and preliminary conclusions. Absorption of the know-how and planning further programs for training. Development and updating the general training course with the introduction of German experience - summary of results. General planning of a training course for quality and reliability are as for the next courses. Evaluation, grading and final results awarded to participants, as followed in QA-Training courses - certification. Future trends (tentative) - conclusions. (orig./RW)

  15. Performance management system enhancement and maintenance

    Science.gov (United States)

    Cleaver, T. G.; Ahour, R.; Johnson, B. R.

    1984-01-01

    The research described in this report concludes a two-year effort to develop a Performance Management System (PMS) for the NCC computers. PMS provides semi-automated monthly reports to NASA and contractor management on the status and performance of the NCC computers in the TDRSS program. Throughout 1984, PMS was tested, debugged, extended, and enhanced. Regular PMS monthly reports were produced and distributed. PMS continues to operate at the NCC under control of Bendix Corp. personnel.

  16. Noise and stress effects on preschool personnel

    Directory of Open Access Journals (Sweden)

    Fredrik Sjödin

    2012-01-01

    Full Text Available The aim of the study was to analyze the presence of stress-related health problems among preschool employees and the way in which these reactions are related to noise and other work parameters. The investigation included 101 employees at 17 preschools in Umeå County, located in northern Sweden. Individual noise recordings and recordings in dining rooms and play halls were made at two departments from each preschool. The adverse effects on the employees were analyzed by use of different validated questionnaires and by saliva cortisol samples. Stress and energy output were pronounced among the employees, and about 30% of the staff experienced strong burnout syndromes. Mental recovery after work was low, indicated by remaining high levels of stress after work. The burnout symptoms were associated with reduced sleep quality and morning sleepiness. Cortisol levels supported the conclusion about pronounced daily stress levels of the preschool employees.

  17. School Public Relations: Personnel Roles and Responsibilities

    Science.gov (United States)

    Norton, M. Scott

    2008-01-01

    This article emphasizes the paramount importance of the human resources function in the school system--specifically, in the implementation of an effective school public relations program and in the quality of leadership given by the administrators and the professional and classified staffs. The article submits that school administrators at every…

  18. Personnel decontamination and preventive skin care

    International Nuclear Information System (INIS)

    Henning, Klaus; Gojowczyk, Peter

    2010-01-01

    Skin contamination arises from contact with contaminated aqueous solutions and from transmission of radioactively contaminated dirt particles. As long as the surface of the skin is neither inflamed nor showing any lesions, normally only a limited part of the top layer (epidermis), i.e. the upper layers of the stratum corneum, is contaminated. The intact horny layer has a barrier function protecting against the penetration of chemicals and dirt particles. The horny layer can be damaged by water, solvents, alkaline substances, and acids. In general, it is safe to say that the horny layer acts as a natural barrier to the penetration of liquid and particulate impurities into lower layers of the skin. As long as the horny layer is intact and free from lesions, the risk of incorporation can be considered low. When decontaminating and cleansing the skin, also in daily skin cleansing, care must be taken to prevent the acid protective layer and the horny layer from being compromised. Daily cleansing and cleansing for decontamination must be carried out with a mild, weakly acidic detergent. In addition, prevention should be achieved daily by applying a non-greasy skin lotion to protect the skin. Following a systematic regular regimen in skin cleansing and preventive skin care as well as a specific approach in skin decontamination and cleansing will avoid damage to the skin and remove any contamination incurred. This approach comprises a three-pronged concept, namely skin protection, cleansing and care. (orig.)

  19. New technology for optimized I and C maintenance and management of ageing of critical equipment in nuclear power plants

    International Nuclear Information System (INIS)

    Hashemian, H.M.

    2000-01-01

    Advanced sensors and new testing and maintenance technologies have become available over the last ten years for nuclear power plants (NPPs) to replace outdated, obsolete, and troublesome instruments, provide for management of ageing of critical plant equipment, optimize maintenance activities, reduce maintenance costs and personnel radiation exposure, and at the same time, improve plant safety and availability. These new developments are reviewed in this TECDOC. The material covered here has been summarized from NUREG/CR-5501, a 1998 report written by H.M. Hashemian and his co-authors for the US Nuclear Regulatory Commission. (author)

  20. Teamwork and the National Security Personnel System

    National Research Council Canada - National Science Library

    Willoughby, Michael B

    2007-01-01

    .... However, concern exists that only rewarding individual performance may adversely impact teamwork, collaboration, and information sharing, which could ultimately impact organizational performance...

  1. Maintenance and plugging technology for CANDU steam generator tubing

    International Nuclear Information System (INIS)

    Prince, J.; Nicholson, A.; Hare, J.; McGoey, L.; Stafford, T.; Gowthorpe, P.

    2006-01-01

    In order to keep aging steam generators in service and to successfully manage the life of these critical components, the capability must exist to perform tube plugging and other complex maintenance activities in-situ. In the early days of CANDU steam generator operation, the only option was to perform these activities manually, which had inherent safety and quality risks. The challenge was to be able to perform these activities remotely thus eliminating some of the confined space and radiological exposure risks. The additional challenge was to develop equipment and techniques which would result in significantly improved quality, particularly for the completed plug welds which would be returned to service. Over the past fifteen years, this technology has matured and has produced remarkable results in field application. Some 14000 tube plugs have been successfully installed to date using automated plugging techniques. This paper presents an overview of the development of techniques available to utilities for steam generator tube plugging as well as some highlights of other steam generator tube maintenance activities such as primary side tube removal and tube end damage repair. Aspects covered in the paper include plug and procedure development, automated equipment and manipulators for tool deployment, process controls and personnel requirements. Recently, the steam generator tube plugging performed by OPG has been incorporated into a formal quality program under the requirements of ASME NCA 4000. An overview of the quality program will be presented and details of some of the important aspects of the quality program will be discussed. (author)

  2. Personnel Selection and White Collar Criminality

    Science.gov (United States)

    1993-08-01

    in groups of individuals who may be considered homogeneous but for a 3 particular bahavioral response -- engagement in counterproductive work behavior...author met with the groups of inmates and asked for their volunteer participation. Group members were informed that all research information would be...sessions at which time volunteer participation was sought and the CPI was 3 administered. There were no remunerations nor incentives provided for I .either

  3. Personnel Motivation: Essence and Modern Problems

    Directory of Open Access Journals (Sweden)

    Ovsiuk Nina V.

    2014-02-01

    Full Text Available The goal of the article lies in the study of the essence of labour motivation and establishment of differences between stimulation and motivation. While analysing the “motivation” notion the article shows that internal wishes and goals of a human being stimulate this human being to act in a specific direction in order to achieve the set goal. Moreover, the article states that there are two theories of motivation in the modern economic literature – meaningful and procedural. As analysis of indicators of payment for labour in Ukraine shows, there is a rather significant differentiation of sizes of wages by branches of economic activity and there are arrears of wages. These indicators to a certain extent facilitate reduction of motivation of workers for labour activity. In order to increase employment of the population under conditions of the market economy, it is necessary to develop a system of measures for elimination of these problems at the state level and also to reduce to the minimum manifestations of “shadowing” wages.

  4. Nez Perce Tribal Hatchery Project, Operations and Maintenance and Planning and Design, 2001 Annual Report.

    Energy Technology Data Exchange (ETDEWEB)

    Larson, Roy Edward; Walker, Grant W.; Penney, Aaron K. (Nez Perce Tribe, Lapwai, ID)

    2006-03-01

    This report fulfills the contract obligations based on the Statement of Work (SOW) for the project as contracted with Bonneville Power Administration (BPA). Nez Perce Tribal Hatchery (NPTH) Year-2001 annual report combines information from two contracts with a combined value of $2,336,491. They are identified by Bonneville Power Administration as follows: (1) Operations and Maintenance--Project No. 1983-350-00, Contract No. 4504, and (2) Planning and Design--Project No. 1983-350-00, Contract No. 4035. The Operations and Maintenance (O&M) budget of $2,166,110 was divided as follows: Facility Development and Fish Production Costs--$860,463; and Equipment Purchases as capital cost--$1,305,647 for equipment and subcontracts. The Planning and Design (P&D) budget of $170,381 was allocated to development of a Coho master planning document in conjunction with Nez Perce Tribal Hatchery. The O&M budget expenditures represent personnel and fish production expenses; e.g., administration, management, coordination, facility development, personnel training and fish production costs for spring Chinook and Coho salmon. Under Objective 1: Fish Culture Training and Education, tribal staff worked at Clearwater Anadromous Hatchery (CAFH) an Idaho Department of Fish and Game (IDFG) facility to produce spring Chinook smolt and parr for release that are intended to provide future broodstock for NPTH. As a training exercise, BPA allowed tribal staff to rear Coho salmon at Dworshak National Fish Hatchery, a U.S. Fish and Wildlife Service (USFWS) facility. This statement of work allows this type of training to prepare tribal staff to later rear salmon at Nez Perce Tribal Hatchery under Task 1.6. As a subset of the O&M budget, the equipment purchase budget of $1,305,647 less $82,080 for subcontracts provides operational and portable equipment necessary for NPTH facilities after construction. The equipment budget for the year was $1,223,567; this year's purchases amounted $287,364.48 (see

  5. Investigation of Psychological Health and Migraine Headaches Among Personnel According to Effort-Reward Imbalance Model

    Directory of Open Access Journals (Sweden)

    Z. Darami

    2012-05-01

    Full Text Available Background and aims: The relationship between physical-mental health and Migraine headaches and stress, especially job stress, is known. Many factors can construct job stress in work settings. The factor that has gained much attention recently is inequality (imbalance of employees’ effort versus the reward they gain. The aim of the current attempt was to investigate the validity of effort-reward imbalance model and indicate the relation of this model with migraine headaches and psychological well-being among subjects in balance and imbalance groups. Methods: Participants were 180 personnel of Oil distribution company located in Isfahan city, and instruments used were General health questionnaire (Goldberg & Hilier, Social Re-adjustment Rating Scale (Holmes & Rahe, Ahvaz Migraine Questionnaire (Najariyan and Effort-reward imbalance scale (Van Vegchel & et al.   Results: The result of exploratory and confirmatory factor analysis for investigating the Construct validity of the effort-reward imbalance model showed that in both analyses, the two factor model was confirmed. Moreover, findings indicate that balance group was in better psychological (p<0/01 and physical (migraine (p<0/05 status comparing to the imbalance group. These findings indicate the significance of justice to present appropriate reward relative to personnel performance on their health.   Conclusion: Implication of these findings can improve Iranian industrial personnel health from both physical and psychological aspects.  

  6. INVITATION to CERN pensioners and personnel

    CERN Multimedia

    DG Unit

    2009-01-01

    The Swiss Foundation for Research into Ageing, AETAS, will be holding its research award ceremony at CERN on Wednesday 10 June 2009. You are cordially invited to attend the ceremony and, in particular, a lecture given by Professor Osman RATIB Professor of Medicine, Head of the Department of Medical Imaging and Medical Informatics and Head of the Division of Nuclear Medicine at the University Hospital of Geneva "Progress in medical imaging" WEDNESDAY 10 JUNE 2009 AT 5:00 P.M. CERN MAIN AUDITORIUM (Bldg.500) The lecture will be followed by a discussion moderated by Professor Jean-Pierre Michel, President of the AETAS Foundation. Refreshments will be offered by the Foundation

  7. INVITATION to CERN pensioners and personnel

    CERN Multimedia

    GS Department

    2009-01-01

    The Swiss Foundation for Research into Ageing, AETAS, will be holding its research award ceremony at CERN on Wednesday 10 June 2009. You are cordially invited to attend the ceremony and, in particular, a lecture given by Professor Osman RATIB Professor of Medicine, Head of the Department of Medical Imaging and Medical Informatics and Head of the Division of Nuclear Medicine at the University Hospital of Geneva "Progress in medical imaging" WEDNESDAY 10 JUNE 2009 AT 5.00 P.M. CERN MAIN AUDITORIUM, (Bldg.500) The lecture will be followed by a discussion moderated by Professor Jean-Pierre Michel, President of the AETAS Foundation. Drinks will be offered by the Foundation

  8. A Novel of Hybrid Maintenance Management Models for Industrial Applications

    OpenAIRE

    Tahir, Zulkifli

    2010-01-01

    It is observed through empirical studies that the effectiveness of industrial process have been increased by a well organized of machines maintenance structure. In current research, a novel of maintenance concept has been designed by hybrid several maintenance management models with Decision Making Grid (DMG), Analytic Hierarchy Process (AHP) and Fuzzy Logic. The concept is designed for maintenance personnel to evaluate and benchmark the maintenance operations and to reveal important maintena...

  9. Reserve Component Personnel Issues: Questions and Answers

    Science.gov (United States)

    2017-01-18

    under this authority entered active duty on March 1, 1998. This low-intensity conflict with Iraq changed to a high -intensity conflict on March 20...for involuntary mobilization of Guard/Reserve units will remain a one year mobilized to five year demobilized ratio . However, today’s global demands...accrues or receives, directly or indirectly, in cash or in kind every payday: basic pay, basic allowance for housing, basic allowance for subsistence, and

  10. ICD Complex Operations and Maintenance Plan

    Energy Technology Data Exchange (ETDEWEB)

    Gibson, P. L.

    2007-06-25

    This Operations and Maintenance (O&M) Plan describes how the Idaho National Laboratory (INL) conducts operations, winterization, and startup of the Idaho CERCLA Disposal Facility (ICDF) Complex. The ICDF Complex is the centralized INL facility responsible for the receipt, storage, treatment (as necessary), and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) remediation waste.

  11. Automobile Starting and Lighting System Maintenance Training ...

    African Journals Online (AJOL)

    The purpose of this study is to develop automobile starting and lighting system maintenance training manual for technical college students. Research and Development (R and D) design was adopted for the study. The population of the study is 348, comprising of 76 auto-mechanics teachers, 36 automobile supervisors and ...

  12. Maintenance and fabrication of electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Chung, Chong Eun; Moon, Byung Soo; Hong, Suk Boong; Kim, Jung Bok

    1999-12-01

    Providing technical support to the maintenance and repair problems of electronic instruments, we have assisted the research and development work, and reduced operation cost of the pilot plants in KAERI. In addition, we have improved the performance of the data processing system of RMS, and also modified the cyclic box using PLC which is a facility for airborne monitoring in radiation area. (author)

  13. Manpower and Personnel Requirements Determination Methodologies (MANPERS).

    Science.gov (United States)

    1984-12-01

    appropriate. The raters agreed most: of the time, and discussed reasons for discre- pancies; however, there was no formal scoring because the ratings...97-7 Piano Player 02N 3-97-11 Guitar Player 02T 3-97-13 Baritone or Euphonium Player 02C 3-97-7 .. TRasson Player 02K 3-97-7 Brass Group Leader 02P 3...These scales permit the rater to select a score ranging from 0 to 17, with sample task descrip- tions (i.e., anchor points) provided to assist the

  14. 4'' + D VR technology for structural analysis and integrated maintenance of nuclear power plants

    International Nuclear Information System (INIS)

    Lee, I. S.; Yoon, S. H.; Shim, K. W.; Yu, Y. H.; Suh, K. Y.

    2002-01-01

    There continues to be an increasing demand of electricity around the globe to fuel the industrial growth and to promote the human welfare. The economic activities have brought about richness in our material and cultural lives, in which process the electric power has been at the heart of the versatile energy sources. In order to timely and competitively respond to rapidly changing energy environment in the twenty-first century there is a growing need to build the advanced nuclear power plants in the unlimited K, which were confirmed by FTIR and 51 V Ncommissioning. One can then realistically evaluate their construction time and cost per varying methods and options available from the leading-edge technology. In particular a great deal of efforts have yet to be made for time- and cost-dependent plant simulation and dynamically coupled database construction in the VR space. The operator training and personnel education may also benefit from the VR technology. The present work is being proposed in the three-dimensional space and time plus cost coordinates, i.e. four plus dimensional (4 + D) coordinates. The 4 + D VR application will enable the nuclear industry to narrow the technological gap from the other leading industries that have long since been employing the VR engineering. The 4 + D technology will help nurture public understanding of the special discipline of nuclear power plants. The technology will also facilitate public access to the knowledge on the nuclear science and engineering which has so far been monopolized by the academia, national laboratories and the heavy industry. The 4 + D virtual design and construction will open up the new horizon for revitalization of the nuclear industry over the globe in the foreseeable future. Considering the long construction and operation time for the nuclear power plants, the preliminary VR simulation capability for the plants will supply the vital information not only for the actual design and construction of the

  15. Constructability and maintainability

    International Nuclear Information System (INIS)

    Hart, R.S.

    1985-01-01

    A set of principles for minimizing the construction schedule was established at the outset of the CANDU 300 programme. Consideration of these principles and other factors led to the development of the unique CANDU 300 station layout. The paper discusses the CANDU 300 station layout and construction methods. In summary, the station layout provides 360 deg. construction access to all buildings, separation of nuclear and non-nuclear systems, precise and minimal physical interfaces between buildings, accommodation of many contractors and construction activities without interference, and maximum flexibility in terms of constructional, financial and supply arrangements. The CANDU 300 further employs modularization, shop fabrication and advanced instrumentation (multiplexers, remote processors, data highways) to minimize construction time. Many of the CANDU 300 features that enhance constructability also contribute to maintainability. These include the 360 deg. access to all principal buildings, the uncluttered and spacious building layouts, the simplification of systems and the high level of modularization. The CANDU 300 has also been designed to facilitate the replacement of all key components, thereby offering an essentially unlimited station life. A prime example is a reduction in the fuel channel inlet end-fitting diameter such that the fuel channels can be shop assembled and easily replaced after the initial 40 years of operation, without an extended unit outage. Maintainability within the reactor building has been given particular attention in the CANDU 300 design; key features of other CANDU reactors (the ability to replace a heat transport system pump motor at power, for example) have been incorporated, while accessibility and maintainability of all systems and components have been enhanced. These and other aspects of maintainability are discussed. (author)

  16. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Han, Kwang Soo; Jeong, Jong Eun; Park, Kwang Hyeon; Hong, Suk Bong; Moon, Je Sun; Choi, Myeong Jin; Kim, Seung Bok; Kim, Jeong Bok

    1994-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation costs of the pilot plants in KAERI. In addition, we have imposed the maintainability of instruments to use effectively. 15 tabs., 14 figs., 14 refs. (Author) .new

  17. Maintenance and fabrication of electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Han, Kwang Soo; Chung, Chong Eun; Park, Kwang Hyeon; Hong, Suk Boong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jung Bok

    1996-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation cost of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. (author). 10 refs., 18 tabs., 8 figs.

  18. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Han, Kwang Soo; Chung, Chong Eun; Park, Kwang Hyeon; Hong, Suk Boong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jung Bok.

    1996-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation cost of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. (author). 10 refs., 18 tabs., 8 figs

  19. Maintenance and fabrication of electronic equipment

    International Nuclear Information System (INIS)

    Han, Kwang Soo; Jeong, Jong Eun; Park, Kwang Hyun; Hong, Suk Bong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jeong Bok

    1995-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation costs of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. 18 tabs., 17 figs., 13 refs. (Author) .new

  20. Maintenance and fabrication of electronic equipment

    Energy Technology Data Exchange (ETDEWEB)

    Han, Kwang Soo; Jeong, Jong Eun; Park, Kwang Hyun; Hong, Suk Bong; Moon, Je Sun; Choi, Myung Jin; Kim, Seung Bok; Kim, Jeong Bok [Korea Atomic Energy Research Institute, Taejon (Korea, Republic of)

    1995-12-01

    Solving the maintenance and repair problems of electronic instruments, we have supported the research and development work, and reduced operation costs of the pilot plants in KAERI. In addition, we have improved the maintainability of instruments to use effectively. 18 tabs., 17 figs., 13 refs. (Author) .new.