  1. Configuration and Data Management Process and the System Safety Professional

    Science.gov (United States)

    Shivers, Charles Herbert; Parker, Nelson C. (Technical Monitor)

    2001-01-01

    This article presents a discussion of the configuration management (CM) and the Data Management (DM) functions and provides a perspective of the importance of configuration and data management processes to the success of system safety activities. The article addresses the basic requirements of configuration and data management generally based on NASA configuration and data management policies and practices, although the concepts are likely to represent processes of any public or private organization's well-designed configuration and data management program.

  2. Configuration Management Process Assessment Strategy

    Science.gov (United States)

    Henry, Thad

    2014-01-01

    Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*

  3. NCCDS configuration management process improvement

    Science.gov (United States)

    Shay, Kathy

    1993-01-01

    By concentrating on defining and improving specific Configuration Management (CM) functions, processes, procedures, personnel selection/development, and tools, internal and external customers received improved CM services. Job performance within the section increased in both satisfaction and output. Participation in achieving major improvements has led to the delivery of consistent quality CM products as well as significant decreases in every measured CM metrics category.

  4. Establishment of Systematic Design Control/Configuration Management Processes to Enhance Engineering Capability

    International Nuclear Information System (INIS)

    Inagaki, T.; Hamada, T.; Ihara, T.

    2016-01-01

    Full text: After the accident of Fukushima Daiichi Nuclear Power Plant in 2011, Tokyo Electric Power Company (TEPCO) launched various measures to enhance plant safety and safety culture of its employees. One of the important aspects of these measures is to enhance engineering capability and TEPCO is conducting actions to establish systematic design control and configuration management processes as an important foundation of such engineering capability. This paper describes how TEPCO is establishing systematic configuration management processes from three aspects, i.e., design requirement and bases management, facility configuration control, and configuration change management. It also provides brief information of the IT systems that are being introduced and will support the systematic design control and configuration management processes. (author

  5. Configuration Management

    International Nuclear Information System (INIS)

    Morcos, A.; Taylor, H. S.

    1989-01-01

    This paper will briefly discuss the reason for and content of configuration management both for new plants and, when adapted, for older plants. It will then address three types of activities a utility may undertake as part of a nuclear CAM program and with which Sargent and Leyden has been actively involved. The first activity is a methodology for preparing design-basis documentation. The second is the identification of essential data required to be kept by the utility in support of the operation of a nuclear plant. The third activity is a computerized classification system of plant components, allowing ready identification of plant functional and physical characteristics. Plant configuration documentation describes plant components, the ways they arranged to interact, and the ways they are enabled to interact. Configuration management, on the other hand, is more than the control of such documentation. It is a dynamic process for ensuring that a plant configuration meets all relevant requirements for safety and economy, even while the configuration changes and even while the requirements change. Configuration management for a nuclear plant is so complex that it must be implemented in phases and modules. It takes advantage of and integrates existing programs. Managing complexity and streamlining the change process become important additional objectives of configuration management. The example activities fulfill essential goals of an overall CAM program: definition of design baseline, definition of essential plant data, and classification of plant components

  6. Software control and system configuration management - A process that works

    Science.gov (United States)

    Petersen, K. L.; Flores, C., Jr.

    1983-01-01

    A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.

  7. Implementation of Software Configuration Management Process by Models: Practical Experiments and Learned Lessons

    Directory of Open Access Journals (Sweden)

    Bartusevics Arturs

    2014-12-01

    Full Text Available Nowadays software configuration management process is not only dilemma which system should be used for version control or how to merge changes from one source code branch to other. There are multiple tasks such as version control, build management, deploy management, status accounting, bug tracking and many others that should be solved to support full configuration management process according to most popular quality standards. The main scope of the mentioned process is to include only valid and tested software items to final version of product and prepare a new version as soon as possible. To implement different tasks of software configuration management process, a set of different tools, scripts and utilities should be used. The current paper provides a new model-based approach to implementation of configuration management. Using different models, a new approach helps to organize existing solutions and develop new ones by a parameterized way, thus increasing reuse of solutions. The study provides a general description of new model-based conception and definitions of all models needed to implement a new approach. The second part of the paper contains an overview of criteria, practical experiments and lessons learned from using new models in software configuration management. Finally, further works are defined based on results of practical experiments and lessons learned.

  8. Configuration management at NEK

    International Nuclear Information System (INIS)

    Podhraski, M.

    1999-01-01

    Configuration Management (CM) objectives at NEK are to ensure consistency between Design Requirements, Physical Plant Configuration and Configuration Information. Software applications, supporting Design Change, Work Control and Document Control Processes, are integrated in one module-oriented Management Information System (MIS). Master Equipment Component List (MECL) database is central MIS module. Through a combination of centralized database and process migrated activities it is ensured that the CM principles and requirements (accurate, current design data matching plant's physical configuration while complying to applicable requirements), are followed and fulfilled.(author)

  9. Intellectual Model-Based Configuration Management Conception

    Directory of Open Access Journals (Sweden)

    Bartusevics Arturs

    2014-07-01

    Full Text Available Software configuration management is one of the most important disciplines within the software development project, which helps control the software evolution process and allows including into the end project only tested and validated changes. To achieve this, software management completes certain tasks. Concrete tools are used for technical implementation of tasks, such as version control systems, servers of continuous integration, compilers, etc. A correct configuration management process usually requires several tools, which mutually exchange information by generating various kinds of transfers. When it comes to introducing the configuration management process, often there are situations when tool installation is started, yet at that given moment there is no general picture of the total process. The article offers a model-based configuration management concept, which foresees the development of an abstract model for the configuration management process that later is transformed to lower abstraction level models and tools are indicated to support the technical process. A solution of this kind allows a more rational introduction and configuration of tools

  10. Configuration management

    International Nuclear Information System (INIS)

    Beavers, R.R.; Sumiec, K.F.

    1989-01-01

    Increasing regulatory and industry attention has been focused on properly controlling electrical design changes. These changes can be controlled by using configuration management techniques. Typically, there are ongoing modifications to various process systems or additions due to new requirements at every power plant. Proper control of these changes requires that an organized method be used to ensure that all important parameters of the electrical auxiliary systems are analyzed and that these parameters are evaluated accurately. This process, commonly referred to as configuration management, is becoming more important on both fossil and nuclear plants. Recent NRC- and utility-initiated inspections have identified problems due to incomplete analysis of changes to electrical auxiliary systems at nuclear stations

  11. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  12. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  13. Configuration management theory, practice, and application

    CERN Document Server

    Quigley, Jon M

    2015-01-01

    Configuration Management: Theory, Practice, and Application details a comprehensive approach to configuration management from a variety of product development perspectives, including embedded and IT. It provides authoritative advice on how to extend products for a variety of markets due to configuration options. The book also describes the importance of configuration management to other parts of the organization. It supplies an overview of configuration management and its process elements to provide readers with a contextual understanding of the theory, practice, and application of CM. Explaining what a configuration item is and what it implies, the book illustrates the interplay of configuration and data management with all enterprise resources during each phase of a product lifecycle. It also demonstrates the interrelationship of CM to functional resources. Shedding light on current practice, the book describes CM baselines, configuration identification, management baseline changes, and acceptance criteria ...

  14. National Ignition Facility Configuration Management Plan

    International Nuclear Information System (INIS)

    Cabral, S G; Moore, T L

    2002-01-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  15. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  16. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  17. HLT configuration management system

    CERN Document Server

    Daponte, Vincenzo

    2015-01-01

    The CMS High Level Trigger (HLT) is implemented running a streamlined version of the CMS offline reconstruction software running on thousands of CPUs. The CMS software is written mostly in C++, using Python as its configuration language through an embedded CPython interpreter. The configuration of each process is made up of hundreds of modules, organized in sequences and paths. As an example, the HLT configurations used for 2011 data taking comprised over 2200 different modules, organized in more than 400 independent trigger paths. The complexity of the HLT configurations and the large number of configuration produced require the design of a suitable data management system. The present work describes the designed solution to manage the considerable number of configurations developed and to assist the editing of new configurations. The system is required to be remotely accessible and OS-independent as well as easly maintainable easy to use. To meet these requirements a three-layers architecture has been choose...

  18. A PBOM configuration and management method based on templates

    Science.gov (United States)

    Guo, Kai; Qiao, Lihong; Qie, Yifan

    2018-03-01

    The design of Process Bill of Materials (PBOM) holds a hinge position in the process of product development. The requirements of PBOM configuration design and management for complex products are analysed in this paper, which include the reuse technique of configuration procedure and urgent management need of huge quantity of product family PBOM data. Based on the analysis, the function framework of PBOM configuration and management has been established. Configuration templates and modules are defined in the framework to support the customization and the reuse of configuration process. The configuration process of a detection sensor PBOM is shown as an illustration case in the end. The rapid and agile PBOM configuration and management can be achieved utilizing template-based method, which has a vital significance to improve the development efficiency for complex products.

  19. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  20. Configuration Management for Wendelstein 7-X

    International Nuclear Information System (INIS)

    Brakel, R.; Eeten, P.v.; Hartmann, D.A.; Henkelmann, K.; Knauer, J.; Mueller, K.; Okkenga-Wolf, A.; Wenzel, U.

    2009-01-01

    A complex system like the large superconducting Wendelstein 7-X stellarator necessitates a dedicated organizational structure which assures permanent consistency between the requirements of its system specification and the performance attributes of all its components throughout its life time. This includes well-defined processes and centrally coordinated information structures. For this purposes the department Configuration Management (CM) has recently been established at W7-X. The detailed tasks of CM for W7-X are oriented along common CM standards and comprise configuration identification, change management, configuration status accounting and configuration verification. While the assembly of W7-X is proceeding some components are still under procurement or even under design. Thus design changes and non-conformances may have a direct impact on the assembly process. Highest priority has therefore been assigned to efficient control of change and non-conformance processes which might delay the assembly schedule.

  1. Software configuration management

    CERN Document Server

    Keyes, Jessica

    2004-01-01

    Software Configuration Management discusses the framework from a standards viewpoint, using the original DoD MIL-STD-973 and EIA-649 standards to describe the elements of configuration management within a software engineering perspective. Divided into two parts, the first section is composed of 14 chapters that explain every facet of configuration management related to software engineering. The second section consists of 25 appendices that contain many valuable real world CM templates.

  2. Some aspects of configuration management at Nuclear Power Plant Krsko

    International Nuclear Information System (INIS)

    Heruc, Z.; Podhraski, M.

    2000-01-01

    Configuration Management (CM) objectives at Neck are to ensure consistency between Design Requirements, Physical Plant Configuration and Configuration Information. Software applications, supporting Design Change, Work Control and Document Control Processes, are integrated in one module-oriented Management Information System (MIS). From configuration management perspective, Master Equipment Component List (MECL) database is the central MIS module. Through a combination of a centralized database and process migrated activities (modifications, plant operation, maintenance, document control etc.), it is encored that the CM principles and requirements (accurate, current design dana matching plant's physical configuration while complying to applicable requirements), are followed and fulfilled. (author)

  3. Software configuration management

    International Nuclear Information System (INIS)

    Arribas Peces, E.; Martin Faraldo, P.

    1993-01-01

    Software Configuration Management is directed towards identifying system configuration at specific points of its life cycle, so as to control changes to the configuration and to maintain the integrity and traceability of the configuration throughout its life. SCM functions and tasks are presented in the paper

  4. Secure Software Configuration Management Processes for nuclear safety software development environment

    International Nuclear Information System (INIS)

    Chou, I.-Hsin

    2011-01-01

    Highlights: → The proposed method emphasizes platform-independent security processes. → A hybrid process based on the nuclear SCM and security regulations is proposed. → Detailed descriptions and Process Flow Diagram are useful for software developers. - Abstract: The main difference between nuclear and generic software is that the risk factor is infinitely greater in nuclear software - if there is a malfunction in the safety system, it can result in significant economic loss, physical damage or threat to human life. However, secure software development environment have often been ignored in the nuclear industry. In response to the terrorist attacks on September 11, 2001, the US Nuclear Regulatory Commission (USNRC) revised the Regulatory Guide (RG 1.152-2006) 'Criteria for use of computers in safety systems of nuclear power plants' to provide specific security guidance throughout the software development life cycle. Software Configuration Management (SCM) is an essential discipline in the software development environment. SCM involves identifying configuration items, controlling changes to those items, and maintaining integrity and traceability of them. For securing the nuclear safety software, this paper proposes a Secure SCM Processes (S 2 CMP) which infuses regulatory security requirements into proposed SCM processes. Furthermore, a Process Flow Diagram (PFD) is adopted to describe S 2 CMP, which is intended to enhance the communication between regulators and developers.

  5. Belene NPP project configuration management

    International Nuclear Information System (INIS)

    Matveev, A.

    2009-01-01

    The configuration management includes: change identification; change assessment; change coordination; change approval or rejection; Change introduction. One of the main tasks while implementing the above processes is the analysis of the effect of one change upon all the related elements

  6. Integrated Management System, Configuration and Document Control for Research Reactors

    International Nuclear Information System (INIS)

    Steynberg, B.J.; Bruyn, J.F. du

    2017-01-01

    An integrated management system is a single management framework establishing all the processes necessary for the organisation to address all its goals and objectives. Very often only quality, environment and health & safety goals are included when referred to an integrated management system. However, within the research reactor environment such system should include goals pertinent to economic, environmental, health, operational, quality, safeguards, safety, security, and social considerations. One of the important objectives of an integrated management is to create the environment for a healthy safety culture. Configuration management is a disciplined process that involves both management and technical direction to establish and document the design requirements and the physical configuration of the research reactor and to ensure that they remain consistent with each other and the documentation. Configuration is the combination of the physical, functional, and operational characteristics of the structures, systems, and components (SSCs) or parts of the research reactor, operation, or activity. The basic objectives and general principles of configuration management are the same for all research reactors. The objectives of configuration management are to: a) Establish consistency among design requirements, physical configuration, and documentation (including analyses, drawings, and procedures) for the research reactor; b) Maintain this consistency throughout the life of the research reactor, particularly as changes are being made; and c) Retain confidence in the safety of the research reactor. The key elements needed to manage the configuration of research reactors are design requirements, work control, change control, document control, and configuration management assessments. The objective of document control is to ensure that only the most recently approved versions of documents are used in the process of operating, maintaining, and modifying the research reactor

  7. Configuration management of the EU DEMO conceptual design data

    Energy Technology Data Exchange (ETDEWEB)

    Meszaros, Botond; Shannon, Mark [EUROfusion Consortium, PPPT Department, Garching, Boltzmannstr. 2 (Germany); Marzullo, Domenico [CREATE, University of Naples Federico II, P.le Tecchio 80, 80125 Napoli (Italy); Woodley, Colin; Rowe, Steve [CCFE, Culham Science Centre, Oxfordshire OX14 3DB, Abingdon (United Kingdom); Di Gironimo, Giuseppe [CREATE, University of Naples Federico II, P.le Tecchio 80, 80125 Napoli (Italy)

    2016-11-01

    Highlights: • Description of the selection of the DEMO Product Data Management tool. • Introduction of the DEMO configuration management philosophy for the CAD design data. • Description of the enabling tools and systems of the configuration management. - Abstract: The EUROfusion Consortium is setting up – as part of the EU Fusion Roadmap – the framework for the implementation of the (pre)conceptual design phase of the DEMO reactor. Configuration management needs have been identified as one of the key elements of this framework and is the topic of this paper, in particular the configuration of the CAD design data. The desire is to keep the definition and layout of the corresponding systems “light weight” and relatively easy to manage, whilst simultaneously providing a level of detail in the definition of the design configuration that is fit for the purpose of a conceptual design. This paper aims to describe the steps followed during the definition of the configuration management system of the DEMO design data in terms of (i) the identification of the appropriate product data management system, (ii) the description of the philosophy of the configuration management of the design data, and (iii) the introduction of the most important enabling processes.

  8. Configuration management of the EU DEMO conceptual design data

    International Nuclear Information System (INIS)

    Meszaros, Botond; Shannon, Mark; Marzullo, Domenico; Woodley, Colin; Rowe, Steve; Di Gironimo, Giuseppe

    2016-01-01

    Highlights: • Description of the selection of the DEMO Product Data Management tool. • Introduction of the DEMO configuration management philosophy for the CAD design data. • Description of the enabling tools and systems of the configuration management. - Abstract: The EUROfusion Consortium is setting up – as part of the EU Fusion Roadmap – the framework for the implementation of the (pre)conceptual design phase of the DEMO reactor. Configuration management needs have been identified as one of the key elements of this framework and is the topic of this paper, in particular the configuration of the CAD design data. The desire is to keep the definition and layout of the corresponding systems “light weight” and relatively easy to manage, whilst simultaneously providing a level of detail in the definition of the design configuration that is fit for the purpose of a conceptual design. This paper aims to describe the steps followed during the definition of the configuration management system of the DEMO design data in terms of (i) the identification of the appropriate product data management system, (ii) the description of the philosophy of the configuration management of the design data, and (iii) the introduction of the most important enabling processes.

  9. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  10. Ansible configuration management

    CERN Document Server

    Hall, Daniel

    2013-01-01

    Ansible Configuration Management"" is a step-by-step tutorial that teaches the use of Ansible for configuring Linux machines.This book is intended for anyone looking to understand the basics of Ansible. It is expected that you will have some experience of how to set up and configure Linux machines. In parts of the book we cover configuration files of BIND, MySQL, and other Linux daemons, therefore a working knowledge of these would be helpful but are certainly not required.

  11. Prototype equipment status monitor for plant operational configuration management

    International Nuclear Information System (INIS)

    DeVerno, M.; Trask, D.; Groom, S.

    1998-01-01

    CANDU plants, such as the Point Lepreau GS, have tens of thousands of operable devices. The status of each operable device must be immediately available to plan and execute future changes to the plant. Historically, changes to the plant's operational configuration have been controlled using manual and administrative methods where the status of each operable device is maintained on operational flowsheets located in the work control area of the main control room. The operational flowsheets are used to plan and develop Operating Orders (OOs) or Order-to-Operate (OTOs) and the control centre work processes are used to manage their execution. After performing each OO procedure, the operational flowsheets are updated to reflect the new plant configuration. This process can be very time consuming, and due to the manual processes, can lead to the potential for time lags and errors in the recording of the current plant configuration. Through a cooperative research and development program, Canadian CANDU utilities and Atomic Energy of Canada Limited, the design organization, have applied modern information technologies to develop a prototype Equipment Status Monitor (ESM) to address processes and information flow for efficient operational configuration management. The ESM integrates electronic operational flowsheets, equipment databases, engineering and work management systems, and computerized procedures to assess, plan, execute, track, and record changes to the plant's operational configuration. This directly leads to improved change control, more timely and accurate plant status information, fewer errors, and better decision making regarding future changes. These improvements to managing the plant's operational configuration are essential to increasing plant safety, achieving a high plant availability, and maintaining high capability and capacity factors. (author)

  12. Configuration Management Issues at Research Reactors

    International Nuclear Information System (INIS)

    Morris, Charles R.

    2013-01-01

    Configuration Management (from IAEA TECDOC 1651): • The Main Functions of the configuration management process are to: • maintain design requirements of structures, systems and components; • track current as-built drawings, documents, and design basis library; • confirm design change packages demonstrate compliance to design basis in calculations, procurement, safety reviews, update of affected documents, and SSC data; • confirm work orders demonstrate compliance to mandated preventive maintenance; • surveillance, parts replacement and design change installation requirements; • demonstrate procurement of spare parts qualified to meet design basis for proper make, model and quality-level for the SSC location and form, fit and function

  13. Configuration Management (CM) Support for KM Processes at NASA/Johnson Space Center (JSC)

    Science.gov (United States)

    Cioletti, Louis

    2010-01-01

    Collection and processing of information are critical aspects of every business activity from raw data to information to an executable decision. Configuration Management (CM) supports KM practices through its automated business practices and its integrated operations within the organization. This presentation delivers an overview of JSC/Space Life Sciences Directorate (SLSD) and its methods to encourage innovation through collaboration and participation. Specifically, this presentation will illustrate how SLSD CM creates an embedded KM activity with an established IT platform to control and update baselines, requirements, documents, schedules, budgets, while tracking changes essentially managing critical knowledge elements.

  14. Some Aspects of Process Computers Configuration Control in Nuclear Power Plant Krsko - Process Computer Signal Configuration Database (PCSCDB)

    International Nuclear Information System (INIS)

    Mandic, D.; Kocnar, R.; Sucic, B.

    2002-01-01

    During the operation of NEK and other nuclear power plants it has been recognized that certain issues related to the usage of digital equipment and associated software in NPP technological process protection, control and monitoring, is not adequately addressed in the existing programs and procedures. The term and the process of Process Computers Configuration Control joins three 10CFR50 Appendix B quality requirements of Process Computers application in NPP: Design Control, Document Control and Identification and Control of Materials, Parts and Components. This paper describes Process Computer Signal Configuration Database (PCSCDB), that was developed and implemented in order to resolve some aspects of Process Computer Configuration Control related to the signals or database points that exist in the life cycle of different Process Computer Systems (PCS) in Nuclear Power Plant Krsko. PCSCDB is controlled, master database, related to the definition and description of the configurable database points associated with all Process Computer Systems in NEK. PCSCDB holds attributes related to the configuration of addressable and configurable real time database points and attributes related to the signal life cycle references and history data such as: Input/Output signals, Manually Input database points, Program constants, Setpoints, Calculated (by application program or SCADA calculation tools) database points, Control Flags (example: enable / disable certain program feature) Signal acquisition design references to the DCM (Document Control Module Application software for document control within Management Information System - MIS) and MECL (Master Equipment and Component List MIS Application software for identification and configuration control of plant equipment and components) Usage of particular database point in particular application software packages, and in the man-machine interface features (display mimics, printout reports, ...) Signals history (EEAR Engineering

  15. Configuration management program plan for Hanford site systems engineering

    International Nuclear Information System (INIS)

    Hoffman, A.G.

    1994-01-01

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline

  16. Example of software configuration management model

    International Nuclear Information System (INIS)

    Roth, P.

    2006-01-01

    Software configuration management is the mechanism used to track and control software changes and may include the following actions: A tracking system should be established for any changes made to the existing software configuration. Requirement of the configuration management system are the following: - Backup the different software configuration; - Record the details (the date, the subject, the filenames, the supporting documents, the tests, ...) of the changes introduced in the new configuration; - Document all the differences between the different versions. Configuration management allows simultaneous exploitation of one specific version and development of the next version. Minor correction can be perform in the current exploitation version

  17. Information Technology for Nuclear Power Plant Configuration Management

    International Nuclear Information System (INIS)

    2010-07-01

    Configuration management (CM) is an essential component of nuclear power plant design, construction and operation. The application of information technology (IT) offers a method to automate and ensure the timely and effective capture, processing and distribution of key nuclear power plant information to support CM principles and practical processes and procedures for implementation of CM at nuclear power plants. This publication reviews some of the principles established in IAEA-TECDOC-1335, 'Configuration Management in Nuclear Power Plants.' It also recaps tenets laid out in IAEA- TECDOC-1284, 'Information Technology Impact on Nuclear Power Plant Documentation' that supports CM programmes. This publication has been developed in conjunction with and designed to support these other two publications. These three publications combined provide a comprehensive discussion on configuration management, information technology and the relationship between them. An extensive discussion is also provided in this publication on the role of the design basis of the facility and its control through the CM process throughout the facility's lifetime. While this report was developed specifically for nuclear power plants, the principles discussed can be usefully applied to any high hazard nuclear facility

  18. Computer software configuration management

    International Nuclear Information System (INIS)

    Pelletier, G.

    1987-08-01

    This report reviews the basic elements of software configuration management (SCM) as defined by military and industry standards. Several software configuration management standards are evaluated given the requirements of the nuclear industry. A survey is included of available automated tools for supporting SCM activities. Some information is given on the experience of establishing and using SCM plans of other organizations that manage critical software. The report concludes with recommendations of practices that would be most appropriate for the nuclear power industry in Canada

  19. Device configuration-management system

    International Nuclear Information System (INIS)

    Nowell, D.M.

    1981-01-01

    The Fusion Chamber System, a major component of the Magnetic Fusion Test Facility, contains several hundred devices which report status to the Supervisory Control and Diagnostic System for control and monitoring purposes. To manage the large number of diversity of devices represented, a device configuration management system was required and developed. Key components of this software tool include the MFTF Data Base; a configuration editor; and a tree structure defining the relationships between the subsystem devices. This paper will describe how the configuration system easily accomodates recognizing new devices, restructuring existing devices, and modifying device profile information

  20. Spent Nuclear Fuel Project Configuration Management Plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This document is a rewrite of the draft ''C'' that was agreed to ''in principle'' by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project

  1. Configuration management: Phase II implementation guidance

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    Configuration management (CM) is essential to maintaining an acceptable level of risk to the public, workers, environment, or mission success. It is a set of activities and techniques used to maintain consistency among physical and functional configuration, applicable requirements, and key documents. This document provides guidance for continuing the implementation of CM in a phased and graded manner. It describes a cost-effective approach to documented consistency with requirements, with early emphasis on items most important to safety and environmental protection. It is intended to help responsible line managers and configuration management staff personnel in meeting the Energy Systems configuration management policy standard.

  2. Configuration Management File Manager Developed for Numerical Propulsion System Simulation

    Science.gov (United States)

    Follen, Gregory J.

    1997-01-01

    One of the objectives of the High Performance Computing and Communication Project's (HPCCP) Numerical Propulsion System Simulation (NPSS) is to provide a common and consistent way to manage applications, data, and engine simulations. The NPSS Configuration Management (CM) File Manager integrated with the Common Desktop Environment (CDE) window management system provides a common look and feel for the configuration management of data, applications, and engine simulations for U.S. engine companies. In addition, CM File Manager provides tools to manage a simulation. Features include managing input files, output files, textual notes, and any other material normally associated with simulation. The CM File Manager includes a generic configuration management Application Program Interface (API) that can be adapted for the configuration management repositories of any U.S. engine company.

  3. A Software Configuration Management Course

    DEFF Research Database (Denmark)

    Asklund, U.; Bendix, Lars Gotfred

    2003-01-01

    Software Configuration Management has been a big success in research and creation of tools. There are also many vendors in the market of selling courses to companies. However, in the education sector Software Configuration Management has still not quite made it - at least not into the university...... curriculum. It is either not taught at all or is just a minor part of a general course in software engineering. In this paper, we report on our experience with giving a full course entirely dedicated to Software Configuration Management topics and start a discussion of what ideally should be the goal...

  4. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management

    International Nuclear Information System (INIS)

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management

  5. Innovative Graded Approach to D and D Configuration Management

    International Nuclear Information System (INIS)

    Kronvall, C.M.; Muller, F.J.; Spencer, R.S.

    2009-01-01

    CH2M Hill Plateau Remediation Contract personnel have developed and implemented an innovative, graded approach to Configuration Management for use in the Decontamination and Decommissioning (D and D) of Nuclear Facilities. The Work Package Configuration Management (WPCM) (1) process is a change management process that inserts engineering rigor into a work package to ensure safe modification to a Structure, System, or Component (SSC). Sketches, historical drawings, or other tools may be used within the process. Traditional configuration management requires that design documentation be prepared, reviewed, approved, and placed into a stand alone data management system. Following of approval for construction/modification, the design package is placed into a work package. The work package adds installation instructions and proceeds through a separate review and approval prior to being placed into a second data management system. The practice allows for the separate tracking and retrieval of design and maintenance/construction information. During D and D of a facility where the equipment is being 100% removed and/or the facility is being reduced to 'slab-on-grade', there is minimal value in maintaining a stand alone design history that simply shows a blank drawing where a SSC, or facility used to be. As a way of streamlining the D and D process, the design media is included as a part of the work package that authorizes the work process. Instead of two separate reviews and documentation of information in two separate databases, the design media is reviewed/approved once as a part of the work package process. As an additional means of streamlining the D and D process, the design may include Computer Aided Design (CAD) 3-Dimensional (3-D) multiple diagrams that show the progressive states of equipment removal/facility demolition rather than a single simple 'before and after' diagram. The added graphics flexibility allows field staff to track progress and can be used as a

  6. How to scope configuration projects and manage the knowledge they require

    DEFF Research Database (Denmark)

    Shafiee, Sara; Kristjansdottir, Katrin; Hvam, Lars

    2018-01-01

    Purpose This paper aims to explore the use of the knowledge management (KM) perspective for configuration projects. Configuration projects implement configurators as information technology systems that help companies manage the specification process of customised products. An effective method...... of retrieving and formalising knowledge for configurators is essential, because it can reduce the risk of unsuccessful implementation and the time and effort required for development. Unfortunately, no standard KM frameworks are available specifically for configuration projects. This study identifies...... the knowledge necessary for different phases of a configuration project (which knowledge, for what purpose and from what sources), examines how it is transformed during a configuration project (what KM activities and tools are used) and establishes how the knowledge can be documented for future maintenance...

  7. The Ragnarok Architectural Software Configuration Management Model

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak

    1999-01-01

    The architecture is the fundamental framework for designing and implementing large scale software, and the ability to trace and control its evolution is essential. However, many traditional software configuration management tools view 'software' merely as a set of files, not as an architecture....... This introduces an unfortunate impedance mismatch between the design domain (architecture level) and configuration management domain (file level.) This paper presents a software configuration management model that allows tight version control and configuration management of the architecture of a software system...

  8. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  9. Software control and system configuration management: A systems-wide approach

    Science.gov (United States)

    Petersen, K. L.; Flores, C., Jr.

    1984-01-01

    A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.

  10. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  11. System engineering and configuration management in ITER

    International Nuclear Information System (INIS)

    Chiocchio, S.; Martin, E.; Barabaschi, P.; Bartels, Hans Werner; How, J.; Spears, W.

    2007-01-01

    The construction of ITER will represent a major challenge for the fusion community at large, because of the intrinsic complexity of the tokamak design, the large number of different systems which are all essential for its operation, the worldwide distribution of the design activities and the unusual procurement scheme based on a combination of in-kind and directly funded deliverables. A key requirement for the success of such a large project is that a systematic approach to ensure the consistency of the design with the required performance is adopted. Also, effective project management methods, tools and working practices must be deployed to facilitate the communication and collaboration among the institutions and industries involved in the project. The authors have been involved in the definition and practical implementation of the design integration and configuration control structure inside ITER and in the system engineering process during the selection and optimization of the machine configuration. In parallel, they have assessed design, drawing and documentation management software to be used for the construction phase. Here, they describe the experience gained in recent years, explain the drivers behind the selection of the documents and drawings management systems, and illustrate the scope and issues of the configuration management activities to ensure the congruence of the design, to control and track the design changes and to manage the interfaces among the ITER systems

  12. Configuration management in nuclear power plants

    International Nuclear Information System (INIS)

    2003-01-01

    Configuration management (CM) is the process of identifying and documenting the characteristics of a facility's structures, systems and components of a facility, and of ensuring that changes to these characteristics are properly developed, assessed, approved, issued, implemented, verified, recorded and incorporated into the facility documentation. The need for a CM system is a result of the long term operation of any nuclear power plant. The main challenges are caused particularly by ageing plant technology, plant modifications, the application of new safety and operational requirements, and in general by human factors arising from migration of plant personnel and possible human failures. The IAEA Incident Reporting System (IRS) shows that on average 25% of recorded events could be caused by configuration errors or deficiencies. CM processes correctly applied ensure that the construction, operation, maintenance and testing of a physical facility are in accordance with design requirements as expressed in the design documentation. An important objective of a configuration management program is to ensure that accurate information consistent with the physical and operational characteristics of the power plant is available in a timely manner for making safe, knowledgeable, and cost effective decisions with confidence. Currently, the nuclear industry and governmental organizations are showing an increasing interest in the implementation of this process as an effective way of limiting configuration errors and related risks. In this report the necessary attributes of a good operational CM are identified. It is recognized and emphasized that a CM is one aspect of the overall management system. Nevertheless, this is an important part of managerial activity focused on the compliance of knowledge of the plant personnel, plant documentation and records with the state of the plant technology. The concepts developed in this report present a basic approach to CM, taking into

  13. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    GARRISON, R.C.

    2000-01-01

    This document implements the procedure for providing configuration control for the monitoring and control systems associated with the operation of the Canister Storage Building (CSB). It identifies and defines the configuration items in the monitoring and control systems, provides configuration control of these items throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of the items. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998), HNF-PRO-309, Computer Software Quality Assurance Requirements, HNF-PRO-2778, IRM Application Software System Life Cycle Standards, and applicable sections of administrative procedure AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration Management

  14. Software Configuration Management: The Quality Weakness

    International Nuclear Information System (INIS)

    Arrojo, E.; Garcia, P.

    1998-01-01

    At the moment it is very difficult to din any process in the industry where software is not involved. We trust software does minimize the possibility of process failures. In parallel, the quality and safety requirements of our processes have been improved to satisfactory levels. Let's look around us. Every day, thousands of calculations are carried out by our engineers using computer programs. Hundreds of processes are controlled automatically. Safety marging, limits, operation controls..., are derived from them. The tools begin to control our processes but, Who does control the tool? Once they have been installed and once they are running, are they always reliable? NO If you think that your current system are satisfactory, we propose you a game in this report. It is just a test. Which is your score?. Then we revise the concept of Configuration Management and we describe an ideal machine; the ''Perpetuum Mobile'' of the Configuration. We describe some rules to implement and improvement and we comment on the operative experience in ENUSA. (Author)

  15. Working Environment and Software Configuration Management Assimiliation using Traceability Enhancement Technique

    International Nuclear Information System (INIS)

    Iqbal, H.; Javed, A.; Majeed, M. N.

    2015-01-01

    Software Configuration Management (SCM) Systems are very useful in coordinating group effort in large and complex software systems. As a result of change in user requirement, market needs, tools, technology or new business goals emanate out, changes are continuously induced while developing the software product. For change management, Traceability technique and SCM are two prominent practices in the software development process. SCM helps in managing configuration items while traceability helps in tracing the knowledge about the configuration items. In this paper we propose a model of the SCM system with the working environment when changes are introduced in multiple artifacts and by which high quality products are developed. (author)

  16. Engineering Documentation Control Handbook Configuration Management and Product Lifecycle Management

    CERN Document Server

    Watts, Frank B

    2011-01-01

    In this new edition of his widely-used Handbook, Frank Watts, widely recognized for his significant contributions to engineering change control processes, provides a thoroughly practical guide to the implementation and improvement of Engineering Documentation Control (EDC), Product Lifecycle Management and Product Configuration Management (CM). Successful and error-free implementation of EDC/CM is critical to world-class manufacturing. Huge amounts of time are wasted in most product manufacturing environments over EDC/CM issues such as interchangeability, document release and change control -

  17. Database foundation for the configuration management of the CERN accelerator controls systems

    International Nuclear Information System (INIS)

    Zaharieva, Z.; Martin Marquez, M.; Peryt, M.

    2012-01-01

    The Controls Configuration Database (CCDB) and its interfaces have been developed over the last 25 years in order to become nowadays the basis for the Configuration Management of the Control System for all accelerators at CERN. The CCDB contains data for all configuration items and their relationships, required for the correct functioning of the Control System. The configuration items are quite heterogeneous, depicting different areas of the Control System - ranging from 3000 Front-End Computers, 75000 software devices allowing remote control of the accelerators, to valid states of the Accelerators Timing System. The article will describe the different areas of the CCDB, their inter-dependencies and the challenges to establish the data model for such a diverse configuration management database, serving a multitude of clients. The CCDB tracks the life of the configuration items by allowing their clear identification, triggering of change management processes as well as providing status accounting and audits. This required the development and implementation of a combination of tailored processes and tools. The Controls System is a data-driven one - the data stored in the CCDB is extracted and propagated to the controls hardware in order to configure it remotely. Therefore a special attention is placed on data security and data integrity as an incorrectly configured item can have a direct impact on the operation of the accelerators. (authors)

  18. Configuration management in nuclear power plants

    CERN Document Server

    2003-01-01

    Configuration management (CM) is the process of identifying and documenting the characteristics of a facility's structures, systems and components of a facility, and of ensuring that changes to these characteristics are properly developed, assessed, approved, issued, implemented, verified, recorded and incorporated into the facility documentation. The need for a CM system is a result of the long term operation of any nuclear power plant. The main challenges are caused particularly by ageing plant technology, plant modifications, the application of new safety and operational requirements, and in general by human factors arising from migration of plant personnel and possible human failures. The IAEA Incident Reporting System (IRS) shows that on average 25% of recorded events could be caused by configuration errors or deficiencies. CM processes correctly applied ensure that the construction, operation, maintenance and testing of a physical facility are in accordance with design requirements as expressed in the d...

  19. System Configuration Management Implementation Procedure for the Cold Vacuum Drying Facility Monitoring and Control System

    International Nuclear Information System (INIS)

    ANGLESEY, M.O.

    2000-01-01

    The purpose of this document is to establish the System Configuration Management Implementation Procedure (SCMIP) for the Cold Vacuum Drying Facility (CVDF) Monitoring and Control System (MCS). This procedure provides configuration management for the process control system. The process control system consists of equipment hardware and software that controls and monitors the instrumentation and equipment associated with the CVDF processes. Refer to SNF-3090, Cold Vacuum Drying Facility Monitoring and Control System Design Description, HNF-3553, Annex B, Safety Analysis Report for the Cold Vacuum Drying Facility, and AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration. This SCMIP identifies and defines the system configuration items in the control system, provides configuration control throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of these items

  20. Operational concepts for the Environmental Restoration and Waste Management Configuration Study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-12-01

    DOE has initiated a planning process in anticipation of upgrading all DOE waste management operations and facilities. The EM Configuration Study examines four areas: (1) planning considerations, (2) system configuration, (3) operational concepts, and (4) resource assessments. Each area is addressed by a different team. Objective of the Operational Concepts Team 3 study is to investigate, identify, define, and evaluate alternative ways to manage DOE waste management facilities, while taking into consideration the information gathered by the other EM Configuration teams. This report provides information and criteria for evaluating the relative effectiveness and efficiency of various organizational alternatives that can be used to operate and manage DOE waste facilities. Intent of this report is not to select one best management alternative but rather to provide recommendations, conclusions, and background information from which decisions will be made at a future date.

  1. Configuration Management for eXtreme Programming

    DEFF Research Database (Denmark)

    Asklund, U.; Bendix, Lars Gotfred; Ekman, T.

    2003-01-01

    Extreme programming (XP) is a software development method that prescribes the use of 12 different practices. Four of these practices (collective code ownership, continuous integration, small releases and refactoring) can indeed be given good support by the use of simple configuration management (CM......) techniques. We report on our experience in providing many groups of novice developers with CM education, processes and tools to support the four CM-related XP practices in their projects. True to the spirit of XP both education and processes are very lightweight and we found that it was sufficient to focus...

  2. Microsoft System Center Configuration Manager advanced deployment

    CERN Document Server

    Coupland, Martyn

    2014-01-01

    If you are an experienced Configuration Manager administrator looking to advance your career or get more from your current environment, then this book is ideal for you. Prior experience of deploying and managing a Configuration Manager site would be helpful in following the examples throughout this book.

  3. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  4. Database Foundation For The Configuration Management Of The CERN Accelerator Controls Systems

    CERN Document Server

    Zaharieva, Z; Peryt, M

    2011-01-01

    The Controls Configuration Database (CCDB) and its interfaces have been developed over the last 25 years in order to become nowadays the basis for the Configuration Management of the Controls System for all accelerators at CERN. The CCDB contains data for all configuration items and their relationships, required for the correct functioning of the Controls System. The configuration items are quite heterogeneous, depicting different areas of the Controls System – ranging from 3000 Front-End Computers, 75 000 software devices allowing remote control of the accelerators, to valid states of the Accelerators Timing System. The article will describe the different areas of the CCDB, their interdependencies and the challenges to establish the data model for such a diverse configuration management database, serving a multitude of clients. The CCDB tracks the life of the configuration items by allowing their clear identification, triggering of change management processes as well as providing status accounting and aud...

  5. Training to Support Standardization and Improvement of Configuration Management Activities

    Energy Technology Data Exchange (ETDEWEB)

    Dauber, V.; Scheffer, N.; Schoenfelder, C.

    2015-07-01

    In recent years AREVA has conducted several measures to enhance the effectiveness and efficiency of configuration management-related activities within a nuclear power plant (NPP) new build as well as modernization projects, thereby further strengthening its commitment to achieving the highest level of safety in nuclear facilities. This paper describes a new training course that shall support the standardization and improvement of configuration management activities. Recommendations will be given that should be considered when designing and developing comparable training programs to support change processes within engineering units. (Author)

  6. Business Model Process Configurations

    DEFF Research Database (Denmark)

    Taran, Yariv; Nielsen, Christian; Thomsen, Peter

    2015-01-01

    , by developing (inductively) an ontological classification framework, in view of the BM process configurations typology developed. Design/methodology/approach – Given the inconsistencies found in the business model studies (e.g. definitions, configurations, classifications) we adopted the analytical induction...

  7. Configuration Management Automation (CMA) -

    Data.gov (United States)

    Department of Transportation — Configuration Management Automation (CMA) will provide an automated, integrated enterprise solution to support CM of FAA NAS and Non-NAS assets and investments. CMA...

  8. Mastering System Center 2012 Configuration Manager

    CERN Document Server

    Rachui, Steve; Martinez, Santos; Daalmans, Peter

    2012-01-01

    Expert coverage of Microsoft's highly anticipated network software deployment tool The latest version of System Center Configuration Manager (SCCM) is a dramatic update of its predecessor Configuration Manager 2007, and this book offers intermediate-to-advanced coverage of how the new SCCM boasts a simplified hierarchy, role-based security, a new console, flexible application deployment, and mobile management. You'll explore planning and installation, migrating from SCCM 2007, deploying software and operating systems, security, monitoring and troubleshooting, and automating and customizing SCC

  9. Space Geodesy Project Information and Configuration Management Procedure

    Science.gov (United States)

    Merkowitz, Stephen M.

    2016-01-01

    This plan defines the Space Geodesy Project (SGP) policies, procedures, and requirements for Information and Configuration Management (CM). This procedure describes a process that is intended to ensure that all proposed and approved technical and programmatic baselines and changes to the SGP hardware, software, support systems, and equipment are documented.

  10. Configuration management issues and objectives for a real-time research flight test support facility

    Science.gov (United States)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    Presented are some of the critical issues and objectives pertaining to configuration management for the NASA Western Aeronautical Test Range (WATR) of Ames Research Center. The primary mission of the WATR is to provide a capability for the conduct of aeronautical research flight test through real-time processing and display, tracking, and communications systems. In providing this capability, the WATR must maintain and enforce a configuration management plan which is independent of, but complimentary to, various research flight test project configuration management systems. A primary WATR objective is the continued development of generic research flight test project support capability, wherein the reliability of WATR support provided to all project users is a constant priority. Therefore, the processing of configuration change requests for specific research flight test project requirements must be evaluated within a perspective that maintains this primary objective.

  11. Role of configuration management in improving quality of metal products

    International Nuclear Information System (INIS)

    Ali, U.; Kalsoom, T.

    2007-01-01

    The Configuration Management (CM) is an imperative discipline which helps in producing quality metal products for the customers. CM implements a graded approach to Configuration Items whose failure poses human as well as product losses. Effective CM provides information to Project Management, Quality Control, and Quality Assurance in identifying schedules and processes related to metal component production. The CM is a supportive function, mostly working side by side with Quality Assurance and Quality Control in the development / production of metal parts. The CM provides tools and guidelines for managing a product while Quality Assurance verifies and validates the same outside the scope of Configuration Audits. Configuration Management raises productivity of metal product, makes-available design reuse, reduces service and support costs, enhances visibility and eliminates rework on metal products. The elements of CM i.e. Identification, Control, Status Accounting and Audits playa vital role to enhance the quality of metal products. Only established CM System can make it possible to swing initial development criteria to final user friendly metal products. The challenges of today in our metal industry are to design and develop state-of-the-art products, for which, CM ideas given in this paper, will help to achieve all the set goals. (author)

  12. Implementation of a configurable laboratory information management system for use in cellular process development and manufacturing.

    Science.gov (United States)

    Russom, Diana; Ahmed, Amira; Gonzalez, Nancy; Alvarnas, Joseph; DiGiusto, David

    2012-01-01

    Regulatory requirements for the manufacturing of cell products for clinical investigation require a significant level of record-keeping, starting early in process development and continuing through to the execution and requisite follow-up of patients on clinical trials. Central to record-keeping is the management of documentation related to patients, raw materials, processes, assays and facilities. To support these requirements, we evaluated several laboratory information management systems (LIMS), including their cost, flexibility, regulatory compliance, ongoing programming requirements and ability to integrate with laboratory equipment. After selecting a system, we performed a pilot study to develop a user-configurable LIMS for our laboratory in support of our pre-clinical and clinical cell-production activities. We report here on the design and utilization of this system to manage accrual with a healthy blood-donor protocol, as well as manufacturing operations for the production of a master cell bank and several patient-specific stem cell products. The system was used successfully to manage blood donor eligibility, recruiting, appointments, billing and serology, and to provide annual accrual reports. Quality management reporting features of the system were used to capture, report and investigate process and equipment deviations that occurred during the production of a master cell bank and patient products. Overall the system has served to support the compliance requirements of process development and phase I/II clinical trial activities for our laboratory and can be easily modified to meet the needs of similar laboratories.

  13. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system

  14. Drupal 8 configuration management

    CERN Document Server

    Borchert, Stefan

    2015-01-01

    Drupal 8 Configuration Management is intended for people who use Drupal 8 to build websites, whether you are a hobbyist using Drupal for the first time, a long-time Drupal site builder, or a professional web developer.

  15. [Formian 2 and a Formian Function for Processing Polyhedric Configurations

    Science.gov (United States)

    Nooshin, H.; Disney, P. L.; Champion, O. C.

    1996-01-01

    The work began in October 1994 with the following objectives: (1) to produce an improved version of the programming language Formian; and (2) to create a means for computer aided handling of polyhedric configurations including the geodesic forms of all kinds. A new version of Formian, referred to as Formian 2, is being implemented to operate in the Windows 95 environment. It is an ideal tool for configuration management in a convenient and user-friendly manner. The second objective was achieved by creating a standard Formian function that allows convenient handling of all types of polyhedric configurations. In particular, the focus of attention is on polyhedric configurations that are of importance in architectural and structural engineering fields. The natural medium for processing of polyhedric configurations is a programming language that incorporates the concepts of 'formex algebra'. Formian is such a programming language in which the processing of polyhedric configurations can be carried out using the standard elements of the language. A description of this function is included in a chapter for a book entitled 'Beyond the Cube: the Architecture of space Frames and Polyhedra'. A copy of this chapter is appended.

  16. Adapting Configuration Management for Agile Teams Balancing Sustainability and Speed

    CERN Document Server

    Moreira, Mario E

    2009-01-01

    Adapting Configuration Management for Agile Teams provides very tangible approaches on how Configuration Management with its practices and infrastructure can be adapted and managed in order to directly benefit agile teams. Written by Mario E. Moreira, author of Software Configuration Management Implementation Roadmap , columnist for CM Crossroads online community and writer for the Agile Journal, this unique book provides concrete guidance on tailoring CM for Agile projects without sacrificing the principles of Configuration Management.

  17. Experiences with Architectural Software Configuration Management in Ragnarok

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak

    1998-01-01

    This paper describes a model, denoted architectural software configuration management, that minimises the gap between software design and configuration management by allowing developers to do configuration- and version control of the abstractions and hierarchy in a software architecture. The model...... emphasises traceability and reproducibility by unifying the concepts version and bound configuration. Experiences with such a model, implemented in a prototype “Ragnarok”, from three real-life, small- to medium-sized, software development projects are reported. The conclusion is that the presented model...

  18. Advantages and Challenges to the Use of On-Line Feedback in CERN’s Accelerators Controls Configuration Management

    CERN Document Server

    Zaharieva, Z; Rolland Lopez De Coca, J; Romero Marin, A

    2014-01-01

    The Controls Configuration Service (CCS) provides the Configuration Management facilities for the Controls System for all CERN accelerators. It complies with Configuration Management standards, tracking the life of configuration items and their relationships by allowing identification and triggering change management processes. Data stored in the CCS is extracted and propagated to the controls hardware for remote configuration. The article will present the ability of the CCS to audit items and verify conformance to specification with the implementation of on-line feedback focusing on Front-End Computers (FEC) configurations. Long-standing problems existed in this area such as discrepancies between the actual state of the FEC and the configuration sent to it at reboot. This resulted in difficult-to-diagnose behaviour and disturbance for the Operations team. The article will discuss the solution architecture (tailored processes and tools), the development and implementation challenges, as well as the advantages...

  19. Comparison of DOE and NIRMA approaches to configuration management programs

    International Nuclear Information System (INIS)

    Yang, E.Y.; Kulzick, K.C.

    1995-01-01

    One of the major management programs used for commercial, laboratory, and defense nuclear facilities is configuration management. The safe and efficient operation of a nuclear facility requires constant vigilance in maintaining the facility's design basis with its as-built condition. Numerous events have occurred that can be attributed to (either directly or indirectly) the extent to which configuration management principles have been applied. The nuclear industry, as a whole, has been addressing this management philosophy with efforts taken on by its constituent professional organizations. The purpose of this paper is to compare and contrast the implementation plans for enhancing a configuration management program as outlined in the U.S. Department of Energy's (DOE's) DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Program,close quotes with the following guidelines developed by the Nuclear Information and Records Management Association (NIRMA): 1. PP02-1994, open-quotes Position Paper on Configuration Managementclose quotes 2. PP03-1992, open-quotes Position Paper for Implementing a Configuration Management Enhancement Program for a Nuclear Facilityclose quotes 3. PP04-1994 open-quotes Position Paper for Configuration Management Information Systems.close quotes

  20. Evolution of an approach to configuration management

    International Nuclear Information System (INIS)

    Bowes, E.V.

    1988-01-01

    Virginia Power is currently in the process of developing and implementing an automated Equipment Data System/Bill of Materials (EDS/BOM) which will support many aspects of maintenance management, including planning, component tracking, materials management and historical reporting. The EDS/BOM system is being developed as an application of a comprehensive automated Work Planning and Tracking System (WPTS) which has become the main system for use in station maintenance management. In addition to these programs, the Company has also developed a Cost Planning and Tracking System (CPTS) and has invested over $20 million in an equipment mark numbering and drawing update program. As these programs have matured, the need has been recognized for a structured configuration management program to protect the multi-million dollar investment in documents and data, and to assure the existence of reliable information as a foundation for improved efficiency in maintenance management and engineering

  1. Configuration of management accounting information system for multi-stage manufacturing

    Science.gov (United States)

    Mkrtychev, S. V.; Ochepovsky, A. V.; Enik, O. A.

    2018-05-01

    The article presents an approach to configuration of a management accounting information system (MAIS) that provides automated calculations and the registration of normative production losses in multi-stage manufacturing. The use of MAIS with the proposed configuration at the enterprises of textile and woodworking industries made it possible to increase the accuracy of calculations for normative production losses and to organize accounting thereof with the reference to individual stages of the technological process. Thus, high efficiency of multi-stage manufacturing control is achieved.

  2. An Evaluation Method of Equipment Reliability Configuration Management

    Science.gov (United States)

    Wang, Wei; Feng, Weijia; Zhang, Wei; Li, Yuan

    2018-01-01

    At present, many equipment development companies have been aware of the great significance of reliability of the equipment development. But, due to the lack of effective management evaluation method, it is very difficult for the equipment development company to manage its own reliability work. Evaluation method of equipment reliability configuration management is to determine the reliability management capabilities of equipment development company. Reliability is not only designed, but also managed to achieve. This paper evaluates the reliability management capabilities by reliability configuration capability maturity model(RCM-CMM) evaluation method.

  3. VAM3D-CG configuration management plan

    International Nuclear Information System (INIS)

    Langford, D.W.

    1994-01-01

    The VAM3D-CG computer code has been licensed for use at Hanford, from HydroGeologic, Inc., of Herndon, VA. Version 2.4b has been installed on the 3200GWW workstations, and is currently under configuration management. The purpose of this report is to describe the installation and configuration management of VAM3D-CG on the Hanford Computer System. VAM3D-CG is written in standard FORTRAN F77

  4. Risk and Work Configuration Management as a Function of Integrated Safety Management

    International Nuclear Information System (INIS)

    Lana Buehrer; Michele Kelly; Fran Lemieux; Fred Williams

    2007-01-01

    National Security Technologies, LLC (NSTec), has established a work management program and corresponding electronic Facilities and Operations Management Information System (e-FOM) to implement Integrated Safety Management (ISM). The management of work scopes, the identification of hazards, and the establishment of implementing controls are reviewed and approved through electronic signatures. Through the execution of the program and the implementation of the electronic system, NSTec staff work within controls and utilize feedback and improvement process. The Integrated Work Control Manual further implements the five functions of ISM at the Activity level. By adding the Risk and Work Configuration Management program, NSTec establishes risk acceptance (business and physical) for liabilities within the performance direction and work management processes. Requirements, roles, and responsibilities are specifically identified in the program while e-FOM provides the interface and establishes the flowdown from the Safety Chain to work and facilities management processes to company work-related directives, and finally to Subject Matter Expert concurrence. The Program establishes, within the defined management structure, management levels for risk identification, risk mitigation (controls), and risk acceptance (business and physical) within the Safety Chain of Responsibility. The Program also implements Integrated Safeguards and Security Management within the NSTec Safety Chain of Responsibility. Once all information has been entered into e-FOM, approved, and captured as data, the information becomes searchable and sortable by hazard, location, organization, mitigating controls, etc

  5. Mastering demand and supply uncertainty with combined product and process configuration

    NARCIS (Netherlands)

    Verdouw, C.N.; Beulens, A.J.M.; Trienekens, J.H.; Verwaart, D.

    2010-01-01

    The key challenge for mastering high uncertainty of both demand and supply is to attune products and business processes in the entire supply chain continuously to customer requirements. Product configurators have proven to be powerful tools for managing demand uncertainty. This paper assesses how

  6. Holistic processing of face configurations and components.

    Science.gov (United States)

    Hayward, William G; Crookes, Kate; Chu, Ming Hon; Favelle, Simone K; Rhodes, Gillian

    2016-10-01

    Although many researchers agree that faces are processed holistically, we know relatively little about what information holistic processing captures from a face. Most studies that assess the nature of holistic processing do so with changes to the face affecting many different aspects of face information (e.g., different identities). Does holistic processing affect every aspect of a face? We used the composite task, a common means of examining the strength of holistic processing, with participants making same-different judgments about configuration changes or component changes to 1 portion of a face. Configuration changes involved changes in spatial position of the eyes, whereas component changes involved lightening or darkening the eyebrows. Composites were either aligned or misaligned, and were presented either upright or inverted. Both configuration judgments and component judgments showed evidence of holistic processing, and in both cases it was strongest for upright face composites. These results suggest that holistic processing captures a broad range of information about the face, including both configuration-based and component-based information. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  7. Windows Calorimeter Control (WinCal) program computer software configuration management plan

    International Nuclear Information System (INIS)

    1997-01-01

    This document describes the system configuration management activities performed in support of the Windows Calorimeter Control (WinCal) system, in accordance with Site procedures based on Institute of Electrical and Electronic Engineers (IEEE) Standard 828-1990, Standard for Software Configuration Management Plans (IEEE 1990) and IEEE Standard 1042-1987, Guide to Software Configuration Management (IEEE 1987)

  8. Software configuration management plan for the Hanford site technical database

    International Nuclear Information System (INIS)

    GRAVES, N.J.

    1999-01-01

    The Hanford Site Technical Database (HSTD) is used as the repository/source for the technical requirements baseline and programmatic data input via the Hanford Site and major Hanford Project Systems Engineering (SE) activities. The Hanford Site SE effort has created an integrated technical baseline for the Hanford Site that supports SE processes at the Site and project levels which is captured in the HSTD. The HSTD has been implemented in Ascent Logic Corporation (ALC) Commercial Off-The-Shelf (COTS) package referred to as the Requirements Driven Design (RDD) software. This Software Configuration Management Plan (SCMP) provides a process and means to control and manage software upgrades to the HSTD system

  9. Improving the quotation process with product configuration

    DEFF Research Database (Denmark)

    Hvam, Lars; Christensen, Simon Pape

    2006-01-01

    How can product configuration support the process of engineering highly complex industrial products? This article describes how an IT-based product configuration system was developed to support the process of mak-ing budget quotations. The article is based on a research project carried out...

  10. Impact of configuration management system of computer center on support of scientific projects throughout their lifecycle

    International Nuclear Information System (INIS)

    Bogdanov, A.V.; Yuzhanin, N.V.; Zolotarev, V.I.; Ezhakova, T.R.

    2017-01-01

    In this article the problem of scientific projects support throughout their lifecycle in the computer center is considered in every aspect of support. Configuration Management system plays a connecting role in processes related to the provision and support of services of a computer center. In view of strong integration of IT infrastructure components with the use of virtualization, control of infrastructure becomes even more critical to the support of research projects, which means higher requirements for the Configuration Management system. For every aspect of research projects support, the influence of the Configuration Management system is reviewed and development of the corresponding elements of the system is described in the present paper.

  11. SAP ERP financial accounting and controlling configuration and use management

    CERN Document Server

    Okungbowa, Andrew

    2015-01-01

    SAP ERP modules are notoriously hard to configure and use effectively without a lot of practice and experience. But as SAP ERP Financial Accounting and Controlling: Configuration and Use Management shows, it doesn't have to be so difficult. The book takes a systematic approach that leads SAP Financial Accounting and Controlling (FICO) users step by step through configuring and using all the program's facets. This approach makes configuration complexities manageable. The book's author-SAP expert, trainer, and accountant Andrew Okun

  12. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  13. Configuration management; Solution for mid-life crisis

    International Nuclear Information System (INIS)

    Hancock, L.R.

    1993-01-01

    With the age of most commercial nuclear power plants hovering around twenty years, there is a mid-life crisis facing their engineering management. The crisis is that the design of the plant represented on the engineering documents (electronic or hard copy) and the actual plant configuration increasingly do not match each other. This paper will present: (1) an historical perspective on the evolution of nuclear plant design control technology, (2) impacts that plant operations have on the design, (3) a discussion of the consequences of weak design control, and (4) will offer a methodology to define and improve the configuration management program

  14. Modularisation of Software Configuration Management

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak

    2000-01-01

    management, and outline how modularisation is natural and powerful also in this context. The analysis is partly based on experiences from case studies where small- to medium-sized development projects are using a prototype tool that supports modular software configuration management....

  15. TWRS configuration management requirement source document

    International Nuclear Information System (INIS)

    Vann, J.M.

    1997-01-01

    The TWRS Configuration Management (CM) Requirement Source document prescribes CM as a basic product life-cycle function by which work and activities are conducted or accomplished. This document serves as the requirements basis for the TWRS CM program. The objective of the TWRS CM program is to establish consistency among requirements, physical/functional configuration, information, and documentation for TWRS and TWRS products, and to maintain this consistency throughout the life-cycle of TWRS and the product, particularly as changes are being made

  16. Good Practices for Software Configuration Management with MDA Metodology

    OpenAIRE

    Manuel Morejón Espinosa

    2012-01-01

    Software Configuration Management (SCM) forms part of the software development process. Its principal goal is to coordinate this development and minimize all possible errors. In order to meet its goal various activities are carried out, of which can be identified: items identification, change control, version control, audit and status reporting. Inside enterprise applications the software development can be guided from system model as methodology. The name of this methodology is Model Driven ...

  17. Tank waste remediation system privatization infrastructure program configuration management implementation plan

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program's products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control

  18. Impact of configuration management system of computer center on support of scientific projects throughout their lifecycle

    Science.gov (United States)

    Bogdanov, A. V.; Iuzhanin, N. V.; Zolotarev, V. I.; Ezhakova, T. R.

    2017-12-01

    In this article the problem of scientific projects support throughout their lifecycle in the computer center is considered in every aspect of support. Configuration Management system plays a connecting role in processes related to the provision and support of services of a computer center. In view of strong integration of IT infrastructure components with the use of virtualization, control of infrastructure becomes even more critical to the support of research projects, which means higher requirements for the Configuration Management system. For every aspect of research projects support, the influence of the Configuration Management system is being reviewed and development of the corresponding elements of the system is being described in the present paper.

  19. Design basis reconstitution and configuration management of nuclear power plants

    International Nuclear Information System (INIS)

    Smith, P.R.

    1989-01-01

    The major design requirements of nuclear power plant components, systems, and structures are found in the plant's licensing commitments documented in the Final Safety Analysis Report and in the technical specification commitments of the plant. These specifications consider the original design and its degradation by in-service use. Before a nuclear power plant begins operation, the plant systems, structures, and organizational elements are functionally arranged to operate in a particular way. This functional arrangement is specified by the plant's design requirements and is called its configuration. The paper discusses configuration management and information management for configuration management. The management of large amounts of information and the various information systems associated with nuclear generating facilities is an ever-growing challenge for utilities. Plant operations involve a complex interrelation among data elements, especially in relation to design modifications and operational changes. Consequently, the operation of these data systems is interrelated and, as a result, redundant data items may exist. Thus, in view of the need to control and manage the plant configuration baseline, managers are striving to streamline their information management programs, which usually involves the integration of data-base systems

  20. XCPU2 process management system

    Energy Technology Data Exchange (ETDEWEB)

    Ionkov, Latchesar [Los Alamos National Laboratory; Van Hensbergen, Eric [IBM AUSTIN RESEARCH LAB

    2009-01-01

    Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

  1. Configurable multi-perspective business process models

    NARCIS (Netherlands)

    La Rosa, M.; Dumas, M.; Hofstede, ter A.H.M.; Mendling, J.

    2011-01-01

    A configurable process model provides a consolidated view of a family of business processes. It promotes the reuse of proven practices by providing analysts with a generic modeling artifact from which to derive individual process models. Unfortunately, the scope of existing notations for

  2. Saltwell PIC Skid Programmable Logic Controller (PLC) Software Configuration Management Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell PIC Skids as required by LMH-PRO-309/Rev. 0, Computer Software Quality Assurance, Section 2.6, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell PIC Skid Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell PIC Skid PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis

  3. Configuration management manual as a tool for improving plant change controls

    International Nuclear Information System (INIS)

    Craig, L.L.

    1991-01-01

    Early vintage plants, such as Turkey Point at Florida Power and Light (FP and L) Company, were not provided with as much design documentation as later plants. At FP and L, programs were initiated to reconstruct the design bases, correct and update drawings at Turkey Point, and develop an overall configuration management program for both Turkey Point and St. Lucie plants. This paper discusses the Configuration Management Manual developed by plant and engineering personnel, which is used to train personnel to a common language and achieve better understanding of individual impact on configuration management

  4. Software Configuration Management Plan for the K West Basin Integrated Water Treatment System (IWTS) - Project A.9

    International Nuclear Information System (INIS)

    GREEN, J.W.

    2000-01-01

    This document provides a configuration control plan for the software associated with the operation and control of the Integrated Water Treatment System (IWTS). It establishes requirements for ensuring configuration item identification, configuration control, configuration status accounting, defect reporting and resolution of computer software. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998) and HNF-PRO-309 Computer Software Quality Assurance Requirements, and applicable sections of administrative procedure CM-6-037-00, SNF Project Process Automation Software and Equipment

  5. Guidelines for evaluating software configuration management plans for digital instrumentation and control systems

    International Nuclear Information System (INIS)

    Cheon, Se Woo; Park, Jong Kyun; Lee, Ki Young; Lee, Jang Soo; Kim, Jang Yeon

    2001-08-01

    Software configuration management (SCM) is the process for identifying software configuration items (CIs), controlling the implementation and changes to software, recording and reporting the status of changes, and verifying the completeness and correctness of the released software. SCM consists of two major aspects: planning and implementation. Effective SCM involves planning for how activities are to be performed, and performing these activities in accordance with the Plan. This report first reviews the background of SCM that include key standards, SCM disciplines, SCM basic functions, baselines, software entity, SCM process, the implementation of SCM, and the tools of SCM. In turn, the report provides the guidelines for evaluating the SCM Plan for digital I and C systems of nuclear power plants. Most of the guidelines in the report are based on IEEE Std 828 and ANSI/IEEE Std 1042. According to BTP-14, NUREG-0800, the evaluation topics on the SCM Plan is classified into three categories: management, implementation, and resource characteristics

  6. Microsoft System Center Configuration Manager

    CERN Document Server

    Sandbu, Marius

    2013-01-01

    This book is a step-by-step tutorial that guides you through the key steps in implementing best solutions for high availability and performance tuning. It is split into two distinct approaches: client and site side HA and optimization.Microsoft SCCM High Availability and Performance Tuning is for IT professionals and consultants working with Configuration Manager who wish to learn the skills to deploy a redundant and scalable solution.

  7. Configuration management with chef-solo

    CERN Document Server

    Rahman, Naveed ur

    2014-01-01

    This is a step-by-step guide, full of hands-on examples of real-world deployment tasks. Each topic is explained and placed in context, while also pointing out the key details of the concepts used. This book is aimed at system administrators and system engineers who have an understanding of configuration management tools and infrastructure. For novice administrators, it contains easy-to-use application recipes to get started immediately.

  8. The Software Life-Cycle Based Configuration Management Tasks for the KNICS Project

    International Nuclear Information System (INIS)

    Cheon, Se Woo; Kwon, Kee Choon

    2005-01-01

    Software configuration management (SCM) is an activity, which configures the form of a software system (e.g., design documents and programs) and systematically manages and controls the modifications used to compile the plans, development, and operations resulting from software development and maintenance. The SCM tool, NuSCM, has been specifically developed for the software life-cycle configuration management of developing the KNICS plant protection system (PPS). This paper presents the application of NuSCM to the KNICS project

  9. The TBM-CA configuration management approach for the ITER test blanket module - application to the HCLL TBS

    International Nuclear Information System (INIS)

    Jourd'Heuil, L.; Panayotov, D.; Salavy, J.-F.; Storto, C.; Colombo, M.; Sardain, P.

    2011-01-01

    The European Test Blanket Modules (EU-TBM) are first prototypes of a fusion reactor breeding blanket. They will be tested in dedicated equatorial ports n o 16 of ITER. Technical developments are performed by a Consortium of European Associates (TBM-CA) and supported within the framework of F4E agency. Designing a complex nuclear system like TBM for ITER necessitates an organizational structure inside the consortium to manage in permanence the coherence between requirements (F4E technical and management specifications) and the TBM development through their life time. At the present stage, evolutionary nature of the design from the different teams is important. Highest priority is assigned to the Management support and Design Integration Team (MDIT) to perform an efficient control of the Configuration Management (CM). The TBM-CA CM comprises 4 main processes: a) identifying configuration of a product characteristics, including its interfaces (Configuration identification), b) controlling the evolution from agreed baseline (Configuration Control), c) creating the knowledge database in order to manage the information all along the lifecycle of the items (Configuration status accounting) and d) verifying the current configuration status of the items (Audits). CM is then a powerful tool to link the requirements for engineering, safety, quality assurance and test and acceptance activities. The application of the CM approach is illustrated through the case of TBM-HCLL (Helium Cooled Lithium Lead). The result shows that the proposed methodology and tools are suitable and provide quality solution for the items with a complex configuration such as TBM HCLL.

  10. How Configuration Management Helps Projects Innovate and Communicate

    Science.gov (United States)

    Cioletti, Louis A.; Guidry, Carla F.

    2009-01-01

    This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

  11. Light Duty Utility Arm computer software configuration management plan

    International Nuclear Information System (INIS)

    Philipp, B.L.

    1998-01-01

    This plan describes the configuration management for the Light Duty Utility Arm robotic manipulation arm control software. It identifies the requirement, associated documents, and the software control methodology. The Light Duty Utility Ann (LDUA) System is a multi-axis robotic manipulator arm and deployment vehicle, used to perform surveillance and characterization operations in support of remediation of defense nuclear wastes currently stored in the Hanford Underground Storage Tanks (USTs) through the available 30.5 cm (12 in.) risers. This plan describes the configuration management of the LDUA software

  12. Configural and component processing in simultaneous and sequential lineup procedures.

    Science.gov (United States)

    Flowe, Heather D; Smith, Harriet M J; Karoğlu, Nilda; Onwuegbusi, Tochukwu O; Rai, Lovedeep

    2016-01-01

    Configural processing supports accurate face recognition, yet it has never been examined within the context of criminal identification lineups. We tested, using the inversion paradigm, the role of configural processing in lineups. Recent research has found that face discrimination accuracy in lineups is better in a simultaneous compared to a sequential lineup procedure. Therefore, we compared configural processing in simultaneous and sequential lineups to examine whether there are differences. We had participants view a crime video, and then they attempted to identify the perpetrator from a simultaneous or sequential lineup. The test faces were presented either upright or inverted, as previous research has shown that inverting test faces disrupts configural processing. The size of the inversion effect for faces was the same across lineup procedures, indicating that configural processing underlies face recognition in both procedures. Discrimination accuracy was comparable across lineup procedures in both the upright and inversion condition. Theoretical implications of the results are discussed.

  13. Configural and component processing in simultaneous and sequential lineup procedures

    OpenAIRE

    Flowe, HD; Smith, HMJ; Karoğlu, N; Onwuegbusi, TO; Rai, L

    2015-01-01

    Configural processing supports accurate face recognition, yet it has never been examined within the context of criminal identification lineups. We tested, using the inversion paradigm, the role of configural processing in lineups. Recent research has found that face discrimination accuracy in lineups is better in a simultaneous compared to a sequential lineup procedure. Therefore, we compared configural processing in simultaneous and sequential lineups to examine whether there are differences...

  14. Design basis reconstitution and configuration management of nuclear power plants

    International Nuclear Information System (INIS)

    Smith, P.R.; Cook, R.A.

    1990-01-01

    This paper presents a method by which all plants (those under construction, as well as those in operation) can benefit from a formal, step-by-step approach to data capture, storage, and retrieval for use throughout the plant life cycle. To demonstrate the viability and in-practice success of a single three-dimensional Configuration Management database, the specific capabilities of one such system are discussed in detail: the Plant Configuration Management System (PLANT/CMS). (orig.)

  15. Nuclear plant operations, maintenance, and configuration management using three-dimensional computer graphics and databases

    International Nuclear Information System (INIS)

    Tutos, N.C.; Reinschmidt, K.F.

    1987-01-01

    Stone and Webster Engineering Corporation has developed the Plant Digital Model concept as a new approach to Configuration Mnagement of nuclear power plants. The Plant Digital Model development is a step-by-step process, based on existing manual procedures and computer applications, and is fully controllable by the plant managers and engineers. The Plant Digital Model is based on IBM computer graphics and relational database management systems, and therefore can be easily integrated with existing plant databases and corporate management-information systems

  16. Grading standards, prepared by the Configuration Management Office

    International Nuclear Information System (INIS)

    Cort, G.; Donahue, S.; Frank, J.; Perkins, B.; Wrye, J.

    1994-01-01

    This report describes the grading methodology used by the organization to determine the required levels of configuration management for all controlled elements that are part of the nuclear facility and its operation. The goal is to have a flexible grading system that accurately reflects the overall operational environment. The grading methodology should identify which items, processes, and information should be incorporated into facility baselines as controlled elements; and specify the level of formality that should be applied to activities that employ or impact these controlled elements. Evaluation categories include the following: radiological damage to workers; toxicological damage to workers; industrial safety; environmental damage; property damage; facility availability; cost effect; reputation; and commitments

  17. Simulator configuration management system

    International Nuclear Information System (INIS)

    Faulent, J.; Brooks, J.G.

    1990-01-01

    The proposed revisions to ANS 3.5-1985 (Section 5) require Utilities to establish a simulator Configuration Management System (CMS). The proposed CMS must be capable of: Establishing and maintaining a simulator design database. Identifying and documenting differences between the simulator and its reference plant. Tracking the resolution of identified differences. Recording data to support simulator certification, testing and maintenance. This paper discusses a CMS capable of meeting the proposed requirements contained in ANS 3.5. The system will utilize a personal computer and a relational database management software to construct a simulator design database. The database will contain records to all reference nuclear plant data used in designing the simulator, as well as records identifying all the software, hardware and documentation making up the simulator. Using the relational powers of the database management software, reports will be generated identifying the impact of reference plant changes on the operation of the simulator. These reports can then be evaluated in terms of training needs to determine if changes are required for the simulator. If a change is authorized, the CMS will track the change through to its resolution and then incorporate the change into the simulator design database

  18. Benefits Assessment for Single-Airport Tactical Runway Configuration Management Tool (TRCM)

    Science.gov (United States)

    Oseguera-Lohr, Rosa; Phojanamonogkolkij, Nipa; Lohr, Gary W.

    2015-01-01

    The System-Oriented Runway Management (SORM) concept was developed as part of the Airspace Systems Program (ASP) Concepts and Technology Development (CTD) Project, and is composed of two basic capabilities: Runway Configuration Management (RCM), and Combined Arrival/Departure Runway Scheduling (CADRS). RCM is the process of designating active runways, monitoring the active runway configuration for suitability given existing factors, and predicting future configuration changes; CADRS is the process of distributing arrivals and departures across active runways based on local airport and National Airspace System (NAS) goals. The central component in the SORM concept is a tool for taking into account all the various factors and producing a recommendation for what would be the optimal runway configuration, runway use strategy, and aircraft sequence, considering as many of the relevant factors required in making this type of decision, and user preferences, if feasible. Three separate tools were initially envisioned for this research area, corresponding to the time scale in which they would operate: Strategic RCM (SRCM), with a planning horizon on the order of several hours, Tactical RCM (TRCM), with a planning horizon on the order of 90 minutes, and CADRS, with a planning horizon on the order of 15-30 minutes[1]. Algorithm development was initiated in all three of these areas, but the most fully developed to date is the TRCM algorithm. Earlier studies took a high-level approach to benefits, estimating aggregate benefits across most of the major airports in the National Airspace Systems (NAS), for both RCM and CADRS [2]. Other studies estimated the benefit of RCM and CADRS using various methods of re-sequencing arrivals to reduce delays3,4, or better balancing of arrival fixes5,6. Additional studies looked at different methods for performing the optimization involved in selecting the best Runway Configuration Plan (RCP) to use7-10. Most of these previous studies were high

  19. The configurational approach in supply chain management (SCM) of steel goods

    OpenAIRE

    Dohn, K.

    2014-01-01

    A basic element of supply chain management is the holistic or system view. Following this perspective supply chain management has to analyse the supply chain as a whole and must not only concentrate on details or specific elements. The configurational approach is one method for realizing this. The article analyses how the configurational approach can be applied in SCM of steel goods.

  20. Study of evaluation techniques of software configuration management and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Youn, Cheong; Baek, Y. W.; Kim, H. C.; Han, H. C.; Choi, C. R. [Chungnam National Univ., Taejon (Korea, Republic of)

    2001-03-15

    The Study of activities to solve software safety and quality must be executed in base of establishing software development process for digitalized nuclear plant. Especially study of software testing and Verification and Validation must executed. For this purpose methodologies and tools which can improve software qualities are evaluated and software Testing, V and V and Configuration Management which can be applied to software life cycle are investigated. This study establish a guideline that can be used to assure software safety and reliability requirements in digitalized nuclear plant systems.

  1. The configurational approach in supply chain management (SCM of steel goods

    Directory of Open Access Journals (Sweden)

    K. Dohn

    2014-04-01

    Full Text Available A basic element of supply chain management is the holistic or system view. Following this perspective supply chain management has to analyse the supply chain as a whole and must not only concentrate on details or specific elements. The configurational approach is one method for realizing this. The article analyses how the configurational approach can be applied in SCM of steel goods.

  2. Internal model of gravity influences configural body processing.

    Science.gov (United States)

    Barra, Julien; Senot, Patrice; Auclair, Laurent

    2017-01-01

    Human bodies are processed by a configural processing mechanism. Evidence supporting this claim is the body inversion effect, in which inversion impairs recognition of bodies more than other objects. Biomechanical configuration, as well as both visual and embodied expertise, has been demonstrated to play an important role in this effect. Nevertheless, the important factor of body inversion effect may also be linked to gravity orientation since gravity is one of the most fundamental constraints of our biology, behavior, and perception on Earth. The visual presentation of an inverted body in a typical body inversion paradigm turns the observed body upside down but also inverts the implicit direction of visual gravity in the scene. The orientation of visual gravity is then in conflict with the direction of actual gravity and may influence configural processing. To test this hypothesis, we dissociated the orientations of the body and of visual gravity by manipulating body posture. In a pretest we showed that it was possible to turn an avatar upside down (inversion relative to retinal coordinates) without inverting the orientation of visual gravity when the avatar stands on his/her hands. We compared the inversion effect in typical conditions (with gravity conflict when the avatar is upside down) to the inversion effect in conditions with no conflict between visual and physical gravity. The results of our experiment revealed that the inversion effect, as measured by both error rate and reaction time, was strongly reduced when there was no gravity conflict. Our results suggest that when an observed body is upside down (inversion relative to participants' retinal coordinates) but the orientation of visual gravity is not, configural processing of bodies might still be possible. In this paper, we discuss the implications of an internal model of gravity in the configural processing of observed bodies. Copyright © 2016 Elsevier B.V. All rights reserved.

  3. Strategies to Automatically Derive a Process Model from a Configurable Process Model Based on Event Data

    Directory of Open Access Journals (Sweden)

    Mauricio Arriagada-Benítez

    2017-10-01

    Full Text Available Configurable process models are frequently used to represent business workflows and other discrete event systems among different branches of large organizations: they unify commonalities shared by all branches and describe their differences, at the same time. The configuration of such models is usually done manually, which is challenging. On the one hand, when the number of configurable nodes in the configurable process model grows, the size of the search space increases exponentially. On the other hand, the person performing the configuration may lack the holistic perspective to make the right choice for all configurable nodes at the same time, since choices influence each other. Nowadays, information systems that support the execution of business processes create event data reflecting how processes are performed. In this article, we propose three strategies (based on exhaustive search, genetic algorithms and a greedy heuristic that use event data to automatically derive a process model from a configurable process model that better represents the characteristics of the process in a specific branch. These strategies have been implemented in our proposed framework and tested in both business-like event logs as recorded in a higher educational enterprise resource planning system and a real case scenario involving a set of Dutch municipalities.

  4. V-Model based Configuration Management Program for New-Build Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    An, Kyungik [PartDB Co. Ltd., Daejeon (Korea, Republic of); Cho, Yoon Sang [KHNP Co. Ltd., Daejeon (Korea, Republic of); Freeland, Kent R. [Industrial Analysts Incorporated, New Hampshire (United States)

    2014-05-15

    As NPP operators undertook design basis reconstitution efforts, they began to realize that the design basis is a foundation for Configuration Management (CM). This realization was made evident in the magnitude of the problems that were being observed. This experience also raised serious questions about how the information being developed to produce the design basis documents would be kept up to date in the future. A process to reconstitute the design basis is likely to be ineffective if CM controls are not in place. The right IT solution for CM depends upon a number of factors, including the nuclear power plant culture, budget, target technology, and the nuclear power plant owner/operator's standards, requirements and limitations for its generating fleet. Comprehensive CM Program for NPP is the single greatest strategy to meet the commitment to nuclear excellence. The safety and viability of nuclear power, particularly at the fleet level, depends upon the development of positive design control and design basis to better understanding plant operating dynamics and margin management, along with technology to control the realization of such design in the physical plant. However the most of plant facilities are modified many times, often without suitable support needed to confirm with their design base and to update their engineering data, maintenance rules and operating procedures. This lack of equilibrium between the requirements, design information and physical plant still remains a important issue. This study focuses on how to manage the configuration information of NPP using systems engineering V-model approach, and proposes data model to manage the configuration information in relation to manage their life cycle. Comprehensive CM Program and IMS for NPP life cycle support is the greatest strategy to meet the commitment to nuclear safety.

  5. Saltwell Leak Detector Station Programmable Logic Controller (PLC) Software Configuration Management Plan (SCMP)

    International Nuclear Information System (INIS)

    WHITE, K.A.

    2000-01-01

    This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell Leak Detector Stations as required by HNF-PRO-309/Rev.1, Computer Software Quality Assurance, Section 2.4, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell Leak Detector Station Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell Leak Detector Station PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis

  6. Correctness-preserving configuration of business process models

    NARCIS (Netherlands)

    Aalst, van der W.M.P.; Dumas, M.; Gottschalk, F.; Hofstede, ter A.H.M.; La Rosa, M.; Mendling, J.; Fiadeiro, J.; Inverardi, P.

    2008-01-01

    Reference process models capture recurrent business operations in a given domain such as procurement or logistics. These models are intended to be configured to fit the requirements of specific organizations or projects, leading to individualized process models that are subsequently used for domain

  7. Quality plan and configuration management in complex systems

    International Nuclear Information System (INIS)

    Gonzalez Junto, J.; Merchan Teyssiere

    1993-01-01

    Since the Second World War, the philosophy behind the quality systems of industries and service companies has evolved to embrace the whole life cycle of the product, system or service. In this evolution process, quality has become a strategic factor in the survival of entreprises. The first steps in trying to establish quality systems were taken for the armed forces, followed by space, aeronautical and nuclear projects, whose products were more and more complex and sophisticated. These systems were established by means of quality plans or programmes, and their basic objective was to guarantee a high safety level for the user and/or the general population. In later years, the main concern was to reach a determined quality level not only in one phase of the product life, but in the complete life cycle of the final product. Today a new goal is established and pursued: better quality of the product, service or system life cycle at a lower cost. Methods of improving the quality of systems and processes are the subject of numerous initiatives and studies, to better availability and maintainability of complex equipment or installations, with an extended useful life and greater requirements. Experience in the performance of complex projects shows that a higher quality may be obtained through designing a comprehensive quality plan which pays special attention to information management and modifications of the original design. Obtaining a high reliability level for an installation (equipment, systems, etc), increasing its availability and rationalizing its maintenance may be little less than fanciful without a deep knowledge of the installation, of its activities and its current status in day-to-day operation, which shows the importance of truthful information available to operators and corresponding exactly to their needs. In this frame of mind, a quality plan comprising a configuration management system of information and documents constitutes the basic support tool for

  8. Development of configuration risk management tool

    International Nuclear Information System (INIS)

    Masuda, Takahiro; Doi, Eiji

    2003-01-01

    Tokyo Electric Power Company (referred to as TEPCO hereinafter), and other Japanese utilities as well, have been trying to improve the capacity factor of their Nuclear Power Plants (NPPs) through modernization of Operation and Maintenance strategy. TEPCO intends to apply risk information to O and M field with maintaining or even improving both safety and production efficiency. Under these situations, TEPCO with some BWR utilities started to develop a Configuration Risk Management (CRM) tool that can estimate risk in various plant conditions due to configuration changes during outage. Moreover, we also intend to apply CRM to on-line maintenance (OLM) in the near future. This tool can calculate the Core Damage Frequency (CDF) according to given plant condition, such as SSCs availability, decay heat level and the inventory of coolant in both outage state and full-power operation. From deterministic viewpoint, whether certain configuration meet the related requirements of Technical Specifications. User-friendly interface is one of the important features of this tool because this enables the site engineers with little experience in PSA to quantify and utilize the risk information by this tool. (author)

  9. A method of demand-driven and data-centric Web service configuration for flexible business process implementation

    Science.gov (United States)

    Xu, Boyi; Xu, Li Da; Fei, Xiang; Jiang, Lihong; Cai, Hongming; Wang, Shuai

    2017-08-01

    Facing the rapidly changing business environments, implementation of flexible business process is crucial, but difficult especially in data-intensive application areas. This study aims to provide scalable and easily accessible information resources to leverage business process management. In this article, with a resource-oriented approach, enterprise data resources are represented as data-centric Web services, grouped on-demand of business requirement and configured dynamically to adapt to changing business processes. First, a configurable architecture CIRPA involving information resource pool is proposed to act as a scalable and dynamic platform to virtualise enterprise information resources as data-centric Web services. By exposing data-centric resources as REST services in larger granularities, tenant-isolated information resources could be accessed in business process execution. Second, dynamic information resource pool is designed to fulfil configurable and on-demand data accessing in business process execution. CIRPA also isolates transaction data from business process while supporting diverse business processes composition. Finally, a case study of using our method in logistics application shows that CIRPA provides an enhanced performance both in static service encapsulation and dynamic service execution in cloud computing environment.

  10. Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix D: EOS configuration design data. Part 2: Data management system configuration

    Science.gov (United States)

    1974-01-01

    The Earth Observatory Satellite (EOS) data management system (DMS) is discussed. The DMS is composed of several subsystems or system elements which have basic purposes and are connected together so that the DMS can support the EOS program by providing the following: (1) payload data acquisition and recording, (2) data processing and product generation, (3) spacecraft and processing management and control, and (4) data user services. The configuration and purposes of the primary or high-data rate system and the secondary or local user system are explained. Diagrams of the systems are provided to support the systems analysis.

  11. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  12. The driving elements of an integrated configuration management program

    International Nuclear Information System (INIS)

    Zaalouk, M.G.

    1990-01-01

    The need for an effective long term Plant Configuration Management Program (CMP) has been demonstrated in response to Plant Design Modification and Plant Life Extension activities. Having particular need are those Utilities operating early vintage nuclear plants, where numerous modifications have been made without the benefit of an accurate, complete, properly maintained and controlled Design Basis. This paper presents a model for a long term, cost effective CMP which is based on and driven by the development, maintenance and control of accurate plant Design Basis Information. The model also provides a systematic approach for devising and implementing an integrated Plant CMP based on the essential attributes of the Plant Configuration Management, including Design Basis

  13. Computer software configuration management plan for 200 East/West Liquid Effluent Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Graf, F.A. Jr.

    1995-02-27

    This computer software management configuration plan covers the control of the software for the monitor and control system that operates the Effluent Treatment Facility and its associated truck load in station and some key aspects of the Liquid Effluent Retention Facility that stores condensate to be processed. Also controlled is the Treated Effluent Disposal System`s pumping stations and monitors waste generator flows in this system as well as the Phase Two Effluent Collection System.

  14. Computer software configuration management plan for 200 East/West Liquid Effluent Facilities

    International Nuclear Information System (INIS)

    Graf, F.A. Jr.

    1995-01-01

    This computer software management configuration plan covers the control of the software for the monitor and control system that operates the Effluent Treatment Facility and its associated truck load in station and some key aspects of the Liquid Effluent Retention Facility that stores condensate to be processed. Also controlled is the Treated Effluent Disposal System's pumping stations and monitors waste generator flows in this system as well as the Phase Two Effluent Collection System

  15. Enhancing operability and reliability through configuration management

    International Nuclear Information System (INIS)

    Hancock, L.R.

    1993-01-01

    This paper describes the evolution of plant design control techniques from the early 1970's to today's operating environment that demands accurate, up-to-date design data. This evolution of design control is responsible for the increasingly troublesome scenario of design data being very difficult to locate and when found, its credibility is questioned. The design information could be suspect because there are discrepancies between two or more source documents or there is a difference between the design documents and the physical configuration of the plant. This paper discusses the impact these design control problems are having on plant operations and presents common sense solutions for improving configuration management techniques to ultimately enhance operability and reliability

  16. Sibling Gender Configuration and Family Processes

    NARCIS (Netherlands)

    van der Pol, Lotte D.; Mesman, Judi; Groeneveld, Marleen G.; Endendijk, Joyce J.; van Berkel, Sheila R.; Hallers-Haalboom, Elizabeth T.; Bakermans-Kranenburg, Marian J.

    2016-01-01

    The current study focuses on the effects of sibling gender configuration on family processes during early childhood. In a sample of 369 two-parent families with two children (youngest 12 months, oldest about 2 years older), both siblings’ noncompliant and oppositional behaviors and fathers’ and

  17. Creating sound and reversible configurable process models using CoSeNets

    NARCIS (Netherlands)

    Schunselaar, D.M.M.; Verbeek, H.M.W.; Aalst, van der W.M.P.; Reijers, H.A.; Abramowicz, W.; Kriksciuniene, D.; Sakalauskas, V.

    2012-01-01

    All Dutch municipalities offer the same range of services, and the processes delivering these services are quite similar. Therefore, these municipalities can benefit from configurable process models. This requires the merging of existing process variants into configurable models. Unfortunately,

  18. What carries a mediation process? Configural analysis of mediation.

    Science.gov (United States)

    von Eye, Alexander; Mun, Eun Young; Mair, Patrick

    2009-09-01

    Mediation is a process that links a predictor and a criterion via a mediator variable. Mediation can be full or partial. This well-established definition operates at the level of variables even if they are categorical. In this article, two new approaches to the analysis of mediation are proposed. Both of these approaches focus on the analysis of categorical variables. The first involves mediation analysis at the level of configurations instead of variables. Thus, mediation can be incorporated into the arsenal of methods of analysis for person-oriented research. Second, it is proposed that Configural Frequency Analysis (CFA) can be used for both exploration and confirmation of mediation relationships among categorical variables. The implications of using CFA are first that mediation hypotheses can be tested at the level of individual configurations instead of variables. Second, this approach leaves the door open for different types of mediation processes to exist within the same set. Using a data example, it is illustrated that aggregate-level analysis can overlook mediation processes that operate at the level of individual configurations.

  19. Fundamental attributes of a practical configuration management program for nuclear plant design control

    International Nuclear Information System (INIS)

    Klein, S.M.

    1988-06-01

    This summarizes the results of an evaluation of findings identifies during a number of Safety-System Functional Inspections and Safety System Outage Modification Inspections which are related to configuration management for nuclear plant design control. A computerized database of these findings was generated from a review of the design inspection reports. Based on the results of the evaluation, attributes of a configuration management program were developed which are responsive to minimizing these types of inspection findings. Incorporation of these key attributes is considered good practice in the development of a configuration management program for design control at operating nuclear plants

  20. Optimizing the order processing of customized products using product configuration

    DEFF Research Database (Denmark)

    Hvam, Lars; Bonev, Martin; Denkena, B.

    2011-01-01

    . Product configuration based on integrated modular product structure and product family architecture has been recognized as an effective means for implementing mass customization. In order to evaluate the effects of product configuration on order processing, a study has been conducted by the Department...... and its benefits for the order processing have been evaluated....

  1. Use of configuration management to reduce development costs in metal parts

    International Nuclear Information System (INIS)

    Kalsoom, T.; Ahmad, S.

    2005-01-01

    In development and manufacturing phases of metal parts, design efforts are converted in set of engineering data pack under the given guidelines of Configuration Management (CM). These engineering documents define Configuration Management of metal parts production in a local industry. The development phase is normally less structured and open to Engineering Change Proposals. In our local engineering organizations most of the work done is normally not well documented for future revisions and modernization. This leads to delays in development and increase in production costs of metal parts. This becomes more pronounced if any member of the design team disassociates and leaves the organization. The Configuration Management helps to reduce development costs by providing infrastructure for product identification, documentation, change control, interface control and technical reviews and product audits. Automated or Computer-Assisted CM activities can also be used to shorten response time and increase accuracy and reliability of the produced metal components. (author)

  2. Configuration management plan for the GENII software

    International Nuclear Information System (INIS)

    Rittmann, P.D.

    1994-01-01

    The GENII program calculates doses from radionuclides released into the environment for a variety of possible exposure scenarios. The user prepares an input data file with the necessary modelling assumptions and parameters. The program reads the user's input file, computes the necessary doses and stores these results in an output file. The output file also contains a listing of the user's input and gives the title lines from the data libraries which are accessed in the course of the calculations. The purpose of this document is to provide users of the GENII software with the configuration controls which are planned for use by WHC in accordance with WHC-CM-3-10. The controls are solely for WHC employees. Non-WHC individuals are not excluded, but no promise is made or implied that they will be informed of errors or revisions to the software. The configuration controls cover the GENII software, the GENII user's guide, the list of GENII users at WHC, and the backup copies. Revisions to the software must be approved prior to distribution in accordance with this configuration management plan

  3. Sandia software guidelines, Volume 4: Configuration management

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    This volume is one in a series of Sandia Software Guidelines for use in producing quality software within Sandia National Laboratories. This volume is based on the IEEE standard and guide for software configuration management. The basic concepts and detailed guidance on implementation of these concepts are discussed for several software project types. Example planning documents for both projects and organizations are included.

  4. Configuration management plan for waste tank farms and the 242-A evaporator of tank waste remediation system

    International Nuclear Information System (INIS)

    Laney, T.

    1994-01-01

    The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ''Guide for Operational Configuration Management Program.'' The DOE Standard defines the configuration management program by the five basic program elements of ''program management,'' ''design requirements,'' ''document control,'' ''change control,'' and ''assessments,'' and the two adjunct recovery programs of ''design reconstitution,'' and ''material condition and aging management.'' The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System

  5. Arguments Against a Configural Processing Account of Familiar Face Recognition.

    Science.gov (United States)

    Burton, A Mike; Schweinberger, Stefan R; Jenkins, Rob; Kaufmann, Jürgen M

    2015-07-01

    Face recognition is a remarkable human ability, which underlies a great deal of people's social behavior. Individuals can recognize family members, friends, and acquaintances over a very large range of conditions, and yet the processes by which they do this remain poorly understood, despite decades of research. Although a detailed understanding remains elusive, face recognition is widely thought to rely on configural processing, specifically an analysis of spatial relations between facial features (so-called second-order configurations). In this article, we challenge this traditional view, raising four problems: (1) configural theories are underspecified; (2) large configural changes leave recognition unharmed; (3) recognition is harmed by nonconfigural changes; and (4) in separate analyses of face shape and face texture, identification tends to be dominated by texture. We review evidence from a variety of sources and suggest that failure to acknowledge the impact of familiarity on facial representations may have led to an overgeneralization of the configural account. We argue instead that second-order configural information is remarkably unimportant for familiar face recognition. © The Author(s) 2015.

  6. Software Configuration Management Plan for the Sodium Removal System

    International Nuclear Information System (INIS)

    HILL, L.F.

    2000-01-01

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test

  7. An Implementation of a Network Configuration Management System ...

    African Journals Online (AJOL)

    The job of the network administrator becomes difficult as the number of hosts in a computer network increase. Network management requires the network administrator to have vital configuration information about hosts so as to provide viable solutions. In situations where the hosts span a large area or in several buildings as ...

  8. Tank monitor and control system (TMACS) software configuration management plan

    International Nuclear Information System (INIS)

    GLASSCOCK, J.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments

  9. Configurable Web Warehouses construction through BPM Systems

    Directory of Open Access Journals (Sweden)

    Andrea Delgado

    2016-08-01

    Full Text Available The process of building Data Warehouses (DW is well known with well defined stages but at the same time, mostly carried out manually by IT people in conjunction with business people. Web Warehouses (WW are DW whose data sources are taken from the web. We define a flexible WW, which can be configured accordingly to different domains, through the selection of the web sources and the definition of data processing characteristics. A Business Process Management (BPM System allows modeling and executing Business Processes (BPs providing support for the automation of processes. To support the process of building flexible WW we propose a two BPs level: a configuration process to support the selection of web sources and the definition of schemas and mappings, and a feeding process which takes the defined configuration and loads the data into the WW. In this paper we present a proof of concept of both processes, with focus on the configuration process and the defined data.

  10. Creating a strategic plan for configuration management using computer aided software engineering (CASE) tools

    International Nuclear Information System (INIS)

    Smith, P.R.; Sarfaty, R.

    1993-01-01

    This paper provides guidance in the definition, documentation, measurement, enhancement of processes, and validation of a strategic plan for configuration management (CM). The approach and methodology used in establishing a strategic plan is the same for any enterprise, including the Department of Energy (DOE), commercial nuclear plants, the Department of Defense (DOD), or large industrial complexes. The principles and techniques presented are used world wide by some of the largest corporations. The authors used industry knowledge and the areas of their current employment to illustrate and provide examples. Developing a strategic configuration and information management plan for DOE Idaho Field Office (DOE-ID) facilities is discussed in this paper. A good knowledge of CM principles is the key to successful strategic planning. This paper will describe and define CM elements, and discuss how CM integrates the facility's physical configuration, design basis, and documentation. The strategic plan does not need the support of a computer aided software engineering (CASE) tool. However, the use of the CASE tool provides a methodology for consistency in approach, graphics, and database capability combined to form an encyclopedia and a method of presentation that is easily understood and aids the process of reengineering. CASE tools have much more capability than those stated above. Some examples are supporting a joint application development group (JAD) to prepare a software functional specification document and, if necessary, provide the capability to automatically generate software application code. This paper briefly discusses characteristics and capabilities of two CASE tools that use different methodologies to generate similar deliverables

  11. Systems Engineering Plan and project record Configuration Management Plan for the Mixed Waste Disposal Initiative

    International Nuclear Information System (INIS)

    Bryan, W.E.; Oakley, L.B.

    1993-04-01

    This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation

  12. Which Parts of a Clinical Process EPR Needs Special Configuration

    DEFF Research Database (Denmark)

    Barlach, Anders; Simonsen, Jesper

    2007-01-01

    Subject: Which parts of an electronic patient record (EPR) can initially form a stable standard solution to be used by all clinicians? And which parts of an EPR can we predict needs initial as well as on-going re-configuration to meet the needs from diverse medical specialties. Purpose: To analyze...... which screen types in a clinical process that can be standard configured and which are subject to initial as well as on-going re-configuration. Methods and results: A pilot-project implementing a fully functional clinical process EPR was configured and used at a neurological ward, replacing all paper...... records 24/7. The analysis characterizes the different types of screens, a total of 243 included in the EPR solution. All screens have been extracted from the application and analyzed for changes – in total 222 changes. Discussion and conclusion: Most screens (87%) are very stable. Few (13%) are subjected...

  13. An advanced configuration management system for full scope power plant simulators

    International Nuclear Information System (INIS)

    Storm, J.; Goemann, A.

    1996-01-01

    In August 1993 KSG Kraftwerks-Simulator-Gesellschaft, Germany, awarded a contract to STN ATLAS Elektronik for the delivery of two full scope replica training simulators for the German BWR plants Isar 1 and Philipsburg 1, known as the double simulator project S30 (S31/S32). For both projects a computer based Configuration Management System (CMS) was required to overcome deficiencies of older simulator systems in terms of limited upgrade and maintenance capabilities and incomplete documentation. The CMS allows complete control over the entire simulator system covering all software- and hardware-items and therewith exceed quality assurance requirements as defined in ISO 9000-3 which gives recommendations for software configuration management only. The system is realized under the project using the UNIX based relational database system EMPRESS and is in use as a development- and maintenance-tool to improve simulator quality and ensure simulator configuration integrity

  14. The Development of Spatial Configuration Processing of Visual Word Forms

    Directory of Open Access Journals (Sweden)

    Chienhui Kao

    2011-05-01

    Full Text Available The analysis of spatial relationship, or configuration, among the components of a character is important for visual word form recognition (Kao et al., 2010. We investigated such spatial configuration processing in dyslexics and developing populations. Four types of characters: real- and non-characters and their upside-down versions were used in this study. The task of the observers was to determine whether two characters presented on the display were identical. One group of dyslexic children (Dys and two groups of non-dyslexic controls, one (RL matched Dys in reading performance and the other (CA matched in age, were recruited in this study. Dys performed significantly worse than the control groups for all character types, suggesting a worse visual word form processing in dyslexics. For Dys and CA, the proportional correct response for the upright real characters was better than that for their upside-down versions. RL, (which was younger showed the same effect for the non-characters. Since the non-characters disrupts the global configuration while the inverted characters disrupted both local and global configurations, our results suggest that younger children recognize a word with an analysis of the local configuration while older children, regardless of whether they are dyslexics or not, analyze the global configuration.

  15. Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management. [for NASA Space Station Freedom Program

    Science.gov (United States)

    Gavert, Raymond B.

    1990-01-01

    Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

  16. Code organization and configuration management

    International Nuclear Information System (INIS)

    Wellisch, J.P.; Ashby, S.; Williams, C.; Osborne, I.

    2001-01-01

    Industry experts are increasingly focusing on team productivity as the key to success. The base of the team effort is the four-fold structure of software in terms of logical organisation, physical organisation, managerial organisation, and dynamical structure. The authors describe the ideas put into action within the CMS software for organising software into sub-systems and packages, and to establish configuration management in a multi-project environment. The authors use a structure that allows to maximise the independence of software development in individual areas, and at the same time emphasises the overwhelming importance of the interdependencies between the packages and components in the system. The authors comment on release procedures, and describe the inter-relationship between release, development, integration, and testing

  17. Design knowledge management using configuration manager

    International Nuclear Information System (INIS)

    Kang, Mu Jin; Jung, Seung Hwan

    2000-01-01

    It is known that about 15 to 40 percent of total design time is spent on retrieving information such as standard parts, handbook data, engineering equations, previous designs. This paper describes a knowledge management system for machine tool design. Product structuring, change management, and complex design knowledge management are possible through the developed system. The system can speed up the design process by making necessary data instantly available as it is needed and keeping of all the relevant design information and knowledge including individual decisions, design intentions, documents, and drawings

  18. National waste terminal storage program: configuration management plan. Volume I. Management summary

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the Configuration Management Plan is to describe the Office of Waste Isolation's approach for the systematic identification, change control, status accounting, and auditing of: documents defining the NWTS Program and the plans for attaining the defined objectives; physical and functional characteristics of each storage site, facility, systems and equipment; and associated costs and schedules

  19. Data base management system configuration specification. [computer storage devices

    Science.gov (United States)

    Neiers, J. W.

    1979-01-01

    The functional requirements and the configuration of the data base management system are described. Techniques and technology which will enable more efficient and timely transfer of useful data from the sensor to the user, extraction of information by the user, and exchange of information among the users are demonstrated.

  20. Smart Management in Effective Schools: Effective Management Configurations in General and Vocational Education in the Netherlands

    Science.gov (United States)

    Hofman, W. H. Adriaan; Hofman, Roelande H.

    2011-01-01

    Purpose: In this study the authors focus on different (configurations of) leadership or management styles in schools for general and vocational education. Findings: Using multilevel (students and schools) analyses, strong differences in effective management styles between schools with different student populations were observed. Conclusions: The…

  1. Light Water Reactor Sustainability Program Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Smith; James Knudsen; Bentley Harwood

    2013-08-01

    The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

  2. Benefits Assessment for Tactical Runway Configuration Management Tool

    Science.gov (United States)

    Oseguera-Lohr, Rosa; Phojanamongkolkij, Nipa; Lohr, Gary; Fenbert, James W.

    2013-01-01

    The Tactical Runway Configuration Management (TRCM) software tool was developed to provide air traffic flow managers and supervisors with recommendations for airport configuration changes and runway usage. The objective for this study is to conduct a benefits assessment at Memphis (MEM), Dallas Fort-Worth (DFW) and New York's John F. Kennedy (JFK) airports using the TRCM tool. Results from simulations using the TRCM-generated runway configuration schedule are compared with results using historical schedules. For the 12 days of data used in this analysis, the transit time (arrival fix to spot on airport movement area for arrivals, or spot to departure fix for departures) for MEM departures is greater (7%) than for arrivals (3%); for JFK, there is a benefit for arrivals (9%) but not for departures (-2%); for DFW, arrivals show a slight benefit (1%), but this is offset by departures (-2%). Departure queue length benefits show fewer aircraft in queue for JFK (29%) and MEM (11%), but not for DFW (-13%). Fuel savings for surface operations at MEM are seen for both arrivals and departures. At JFK there are fuel savings for arrivals, but these are offset by increased fuel use for departures. In this study, no surface fuel benefits resulted for DFW. Results suggest that the TRCM algorithm requires modifications for complex surface traffic operations that can cause taxi delays. For all three airports, the average number of changes in flow direction (runway configuration) recommended by TRCM was many times greater than the historical data; TRCM would need to be adapted to a particular airport's needs, to limit the number of changes to acceptable levels. The results from this analysis indicate the TRCM tool can provide benefits at some high-capacity airports. The magnitude of these benefits depends on many airport-specific factors and would require adaptation of the TRCM tool; a detailed assessment is needed prior to determining suitability for a particular airport.

  3. Computational environment and software configuration management of the 1996 performance assessment for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Froehlich, G.K.; Williamson, C.M.; Ogden, H.C.

    2000-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP), located in southeast New Mexico, is a deep geologic repository for the permanent disposal of transuranic waste generated by DOE defense-related activities. Sandia National Laboratories (SNL), in its role as scientific advisor to the DOE, is responsible for evaluating the long-term performance of the WIPP. This risk-based Performance Assessment (PA) is accomplished in part through the use of numerous scientific modeling codes, which rely for some of their inputs on data gathered during characterization of the site. The PA is subject to formal requirements set forth in federal regulations. In particular, the components of the calculation fall under the configuration management and software quality assurance aegis of the American Society of Mechanical Engineers (ASME) Nuclear Quality Assurance (NQA) requirements. This paper describes SNL's implementation of the NQA requirements regarding configuration management. The complexity of the PA calculation is described, and the rationale for developing a flexible, robust run-control process is discussed. The run-control implementation is described, and its integration with the configuration-management system is then explained, to show how a calculation requiring 37,000 CPU-hours, and involving 225,000 output files totaling 95 GB, was accomplished in 5 months by two individuals, with full traceability and reproducibility

  4. Computational environment and software configuration management of the 1996 performance assessment for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Froehlich, Gary K.; Williamson, Charles Michael; Ogden, Harvey C.

    2000-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP), located in southeast New Mexico, is a deep geologic repository for the permanent disposal of transuranic waste generated by DOE defense-related activities. Sandia National Laboratories (SNL), in its role as scientific advisor to the DOE, is responsible for evaluating the long-term performance of the WIPP. This risk-based Performance Assessment (PA) is accomplished in part through the use of numerous scientific modeling codes, which rely for some of their inputs on data gathered during characterization of the site. The PA is subject to formal requirements set forth in federal regulations. In particular, the components of the calculation fall under the configuration management and software quality assurance aegis of the American Society of Mechanical Engineers (ASME) Nuclear Quality Assurance (NQA) requirements. This paper describes SNL's implementation of the NQA requirements regarding configuration management. The complexity of the PA calculation is described, and the rationale for developing a flexible, robust run-control process is discussed. The run-control implementation is described, and its integration with the configuration-management system is then explained, to show how a calculation requiring 37,000 CPU-hours, and involving 225,000 output files totaling 95 Gigabytes, was accomplished in 5 months by 2 individuals, with full traceability and reproducibility

  5. Implementation of a design and configuration management platform for fusion components on the Tore Supra WEST Project

    Energy Technology Data Exchange (ETDEWEB)

    Benoît, Fabrice, E-mail: fabrice-2.benoit@cea.fr [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Allegretti, Ludovic [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Aumeunier, Marie-Hélène [OPTIS, ZE de La Farlède, F-83078 Toulon Cedex 9 (France); Bucalossi, Jérôme; Doceul, Louis; Faïsse, Frederic; Firdaouss, Medhi; Geynet, Michel; Houtte, Didier van; Larroque, Sébastien; Magaud, Philippe; Maini, Patrick; Missirlian, Marc; Parrat, Hélène [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Robert, Julien [SOFYNE, F-69800 Saint Priest (France)

    2014-10-15

    Highlights: •A design and configuration management platform is under development for managing fusion components lifecycle at CEA. •Design platform ensures an efficient sharing of the data and provides connections between the different software and databases involved in fusion components design. •Design platform rollout on WEST project is ongoing as part of change control and configuration management implementation. -- Abstract: This paper presents the technical solutions and methodologies that are used and under development for managing the design lifecycle of the WEST project (W – for tungsten – Environment in Steady-state Tokamak, upgrade of Tore Supra's with actively cooled tungsten plasma facing components) fusion components and explains the interfaces that are implemented or in construction to connect together the different tools like documents management system, CAD modeler, or simulation codes around the data management backbone. It describes the methodologies used on the WEST project to optimize the design process by managing the engineering data workflow and ensuring the consistency between the different 3D representations for design or analysis as well as the specification or interfaces documents. Finally it explains how this platform contributes to reach the project targets in terms of performance, cost and schedule.

  6. Implementation of a design and configuration management platform for fusion components on the Tore Supra WEST Project

    International Nuclear Information System (INIS)

    Benoît, Fabrice; Allegretti, Ludovic; Aumeunier, Marie-Hélène; Bucalossi, Jérôme; Doceul, Louis; Faïsse, Frederic; Firdaouss, Medhi; Geynet, Michel; Houtte, Didier van; Larroque, Sébastien; Magaud, Philippe; Maini, Patrick; Missirlian, Marc; Parrat, Hélène; Robert, Julien

    2014-01-01

    Highlights: •A design and configuration management platform is under development for managing fusion components lifecycle at CEA. •Design platform ensures an efficient sharing of the data and provides connections between the different software and databases involved in fusion components design. •Design platform rollout on WEST project is ongoing as part of change control and configuration management implementation. -- Abstract: This paper presents the technical solutions and methodologies that are used and under development for managing the design lifecycle of the WEST project (W – for tungsten – Environment in Steady-state Tokamak, upgrade of Tore Supra's with actively cooled tungsten plasma facing components) fusion components and explains the interfaces that are implemented or in construction to connect together the different tools like documents management system, CAD modeler, or simulation codes around the data management backbone. It describes the methodologies used on the WEST project to optimize the design process by managing the engineering data workflow and ensuring the consistency between the different 3D representations for design or analysis as well as the specification or interfaces documents. Finally it explains how this platform contributes to reach the project targets in terms of performance, cost and schedule

  7. Tank monitor and control system (TMACS) software configuration management plan; TOPICAL

    International Nuclear Information System (INIS)

    GLASSCOCK, J.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments

  8. Essential 'ways-of-working' features of 'configuration management for new-build 2011' and 'issue-resolved replication'

    International Nuclear Information System (INIS)

    Schneider, B.

    2011-01-01

    The 'Ways-of-Working Foundation' of the Competencies most vital to 'New-Build' are provided. Examples are provided of local CM disasters and I-R.R success stories from else-where. [Configuration Management for New-Build 2011 - State-of-Art Specifications at Every Level - driven by Best-Available OpEx - based on SofA Expertise - subjected to Transparent, Independent Review]. It is the position of CMC2011 that weak CM is at the root of much 'less-than-adequate performance' (especially refurb programs - since ∼1986). For New-Build, the 'Foundation' of Configuration-Management is 'State-of-Art Specifications for All Systems, Equipment, Materials, and Processes' - supported by 'State-of-Art Service-Provider Expertise' - and Audit-able via 'Transparent, Third-Party, Issue-Review-and-Resolution Programs'. CM must be executed by the Architecture-Service-Providers - but it must be demanded by the Utility-Owners. [Issue-Resolved, Configuration-Managed, Replication - Rigorous, Configuration-Managed Replication for the Capture of the 85% that is Proven - plus - Parallel, Transparent, Separately-Managed, Contractually-Facilitated, Side-Stream Programs for the Identification and Resolution of the highly-troublesome 15% that remains Un-Resolved]. For New-Build in 2011, as well as for Refurb and Ops/Outage Support at any time, the last thing the Owner-Utilities want is innovation - or invention - or anything else for which substantial operating-experience and reliability-verification cannot be provided. I-R.R is discussed as - i) 'Rigorous Replication' and ii) 'Issue-Identification and Resolution'. What we refer to as 'Side-Stream, Independently-Driven, Issue-Identification and Resolution' is already practiced by utility 'SIR Teams' - i.e. - 'go-anywhere, do-anything, flying-squads' - for whom the watch-word is 'expect the un-anticipated'. Issue-Resolution must be provided as part of every project. It must be demanded (and contractually-facilitated) up-front by the Utility

  9. Configuration management of TFTR during final fabrication/assembly/installation

    International Nuclear Information System (INIS)

    Sabado, M.; Rappe, G.H.; Stern, E.; Wexler, H.

    1983-01-01

    In essence, configuration management consists of the establishment of a Baseline definition for each project phase, well documented, so that all project participants are conversant with it and the disciplined redefinition of the baseline as the project matures. This paper describes the methods by which the Baseline design for each phase of the TFTR program was updated. Definition was initiated through informal controls which became more formal as the design progressed. At the point where the design was essentially frozen, that is, released for procurement and manufacturing, a configuration change control procedure was instituted to continue on a routine basis both engineering and management review of all changes. Since the TFTR program is experimental in nature it was understood from the outset that desirable changes based on new analytical results and experimental results from other fusion programs could be injected into the design. The problem was one of maintaining the flexibility of providing a reasonable baseline definition, in order to allow the design to proceed yet avoiding the premature freezing of the design, in order to incorporate required changes at lowest cost

  10. The Information System for Operational Activity Organization as a Tool for Configuration Management in NPP

    International Nuclear Information System (INIS)

    Manchev, B. L.; Yordanova, V. S.; Nenkova, B. G.

    2008-01-01

    The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained. This conformity is maintained during the entire life cycle of the facility. CM ensures that during the entire operational life of the plant the following requirements are met: The basic design requirements of the plant are established, documented and maintained; The physical structures, systems and components (SSC) of the plant are in conformity with the design requirements; The physical and functional characteristics of the plant are correctly incorporated in the operational documentation and the documentation for repair, as well as in the documents for tests and training; The changes in the design documentation are incorporated in the physical configuration and the operative documentation; The changes in the design are minimized by management process for review according to approved criteria; The changes proposed in the equipment and documentation of the plant are estimated entirely with the purpose of determining their effect and are reviewed and approved by appropriate managing staff before their introduction. The information system for organization of the operational activity (IS OOA) consists of several modules used for storage and retrieval of data for different aspects of the operation of the equipment at the site of Kozloduy NPP, as defects and failures, design requirements and bases, design data and characteristics, tests, life time, maintenance and repair, as well as changes in the design or the design documentation. IS OOA consists of single relational database and provides built-in connections to the database of the SmartDoc system for control of the documentation, as well as to the database for human resources. Central place in IS OOA is taken by the 'Equipment' module while all other modules are connected with the identification data of the structures

  11. The process of Risk management for E-business

    Directory of Open Access Journals (Sweden)

    Erion Lekaj

    2017-07-01

    Full Text Available In the new Internet economy, risk management plays a critical role to protect the organization and its ability to perform their business mission, not just its IT assets. Risk management is the process of identifying risk, assessing risk, and taking steps to reduce risk to an acceptable level. The risk management is an important component of an IT security program. Information and communications technology management and IT security are responsible for ensuring that technology risks are managed appropriately. These risks originate from the deployment and use of IT assets in various ways, such as configuring systems incorrectly or gaining access to restricted soft ware.

  12. Six sigma implementation and its effects on configuration management related to metal industry

    International Nuclear Information System (INIS)

    Tariq, M.M.; Ahmad, S.F.; Mahmoo, A.; Kalsoom, T.

    2006-01-01

    This paper discusses the implementation of Six Sigma and its effects on Configuration Management (CM) of metal industry. The basic idea behind the Six Sigma philosophy is to continuously reduce product and process variation. Design for Six Sigma (DFSS) methodology generates new processes, products, services, plants, etc., whereas Define, Measure, Analyze, Improve and Control (DMAIC) methodology improves existing processes, products, services, designs, plants, etc. The DFSS project stages are summarized as Identify, Design, Optimize, and Validate (IDOV). Role of CM for DFSS and DMAIC will be discussed. Seven steps for Six Sigma introduction in new management strategy and the other seven steps for Six Sigma improvement implementation shall be discussed indicating possible role of CM. Tasks of Black Belt leader in Six Sigma implementation are very important. The expected outcomes of Six Sigma efforts are: Faster and more robust product development. More efficient and capable manufacturing processes and, more confident overall business performance. The investigation and knowledge of Six Sigma effects produced in metals industry on CM will increase the effectiveness of each other, and it will be a better, reliable and well documented approach towards Six Sigma. (author)

  13. Configuration by Modularisation

    DEFF Research Database (Denmark)

    Riitahuhta, Asko; Andreasen, Mogens Myrup

    1998-01-01

    Globally operating companies have realized that locally customized products and services are today the prerequisite for the success. The capability or the paradigm to act locally in global markets is called Mass Customization [Victor 1997]. The prerequisite for Mass Customization is Configuration...... Management and i Configuration Management the most important means is Modularisation.The goal of this paper is to show Configuration Management as a contribution to the Mass Customisation and Modularisation as a contribution to the industrialisation of the design area [Andreasen 1997]. A basic model...... for the creation of a structured product family is presented and examples are given. The concepts of a novel Dynamic Modularisation method, Metrics for Modularisation and Design for Configurability are presented....

  14. Configuration management after design basis reconstitution

    International Nuclear Information System (INIS)

    Purcell, J.J.; Livingston, B.R.

    1991-01-01

    Over the last few years, Fort Calhoun station (FCS) has implemented a number of programs to enhance plant operability and readiness. The design basis document (DBD) reconstitution project was the cornerstone of this effort. Vendor manual upgrade, operating procedures upgrade, plant equipment data-base verification, equipment labeling, and warehousing improvements were also implemented as part of this improvement program. With the completion of these programs, plant documentation was current to the baselines established by each program, and a configuration management program (CMP) was established to maintain this level of accuracy throughout the remaining life of FCS. Change control throughout the organization has been reviewed and upgraded to ensure that all changes are evaluated for impact to the design bases

  15. Succeeding in process standardization: Explaining the fit with international management strategy

    DEFF Research Database (Denmark)

    Rahimi, Fatemeh; Møller, Charles; Hvam, Lars

    2016-01-01

    Purpose: The purpose of this paper is to explore the fit between process standardization and international management strategy of multinational corporations (MNCs) by assessing the compatibility between process standardization and corporate structural characteristics in terms of asset configuration...... and headquarters-subsidiary relationships. Design/methodology/approach: First, after a literature review on MNCs’ strategy and process standardization, the study suggests two propositions on the fit between corporate international management strategy and process standardization. Second, to empirically examine....../value: The study provides in-depth understanding of how the international management strategy and consequent structural characteristics of MNCs affects process standardization in the course of a global enterprise resource planning implementation. The study proposes conditions of fit for aligning process...

  16. Technology Evaluation of Process Configurations for Second Generation Bioethanol Production using Dynamic Model-based Simulations

    DEFF Research Database (Denmark)

    Morales Rodriguez, Ricardo; Meyer, Anne S.; Gernaey, Krist

    2011-01-01

    An assessment of a number of different process flowsheets for bioethanol production was performed using dynamic model-based simulations. The evaluation employed diverse operational scenarios such as, fed-batch, continuous and continuous with recycle configurations. Each configuration was evaluated...... against the following benchmark criteria, yield (kg ethanol/kg dry-biomass), final product concentration and number of unit operations required in the different process configurations. The results has shown the process configuration for simultaneous saccharification and co-fermentation (SSCF) operating...... in continuous mode with a recycle of the SSCF reactor effluent, results in the best productivity of bioethanol among the proposed process configurations, with a yield of 0.18 kg ethanol /kg dry-biomass....

  17. Ansible configuration management

    CERN Document Server

    Hall, Daniel

    2015-01-01

    This book is intended for anyone who wants to learn Ansible starting from the basics. Some experience of how to set up and configure Linux machines and a working knowledge of BIND, MySQL, and other Linux daemons is expected.

  18. National Waste Terminal Storage Program: configuration management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Purpose of the Configuration Management Plan is to provide the management discipline through which the integrity and continuity of program cost and schedule trade-off decisions which are made concerning the site selections and facilities performance, producibility, operability and supportability are recorded, communicated, and controlled by the Office of Waste Isolation

  19. Software configuration management plan, 241-AY and 241-AZ tank farm MICON automation system

    International Nuclear Information System (INIS)

    Hill, L.F.

    1997-01-01

    This document establishes a Computer Software Configuration Management Plan (CSCM) for controlling software for the MICON Distributed Control System (DCS) located at the 241-AY and 241-AZ Aging Waste Tank Farm facilities in the 200 East Area. The MICON DCS software controls and monitors the instrumentation and equipment associated with plant systems and processes. A CSCM identifies and defines the configuration items in a system (section 3.1), controls the release and change of these items throughout the system life cycle (section 3.2), records and reports the status of configuration items and change requests (section 3.3), and verifies the completeness and correctness of the items (section 3.4). All software development before initial release, or before software is baselined, is considered developmental. This plan does not apply to developmental software. This plan applies to software that has been baselined and released. The MICON software will monitor and control the related instrumentation and equipment of the 241-AY and 241-AZ Tank Farm ventilation systems. Eventually, this software may also assume the monitoring and control of the tank sludge washing equipment and other systems as they are brought on line. This plan applies to the System Cognizant Manager and MICON Cognizant Engineer (who is also referred to herein as the system administrator) responsible for the software/hardware and administration of the MICON system. This document also applies to any other organizations within Tank Farms which are currently active on the system including system cognizant engineers, nuclear operators, technicians, and control room supervisors

  20. Random covering of the circle: the configuration-space of the free deposition process

    Energy Technology Data Exchange (ETDEWEB)

    Huillet, Thierry [Laboratoire de Physique Theorique et Modelisation, CNRS-UMR 8089 et Universite de Cergy-Pontoise, 5 mail Gay-Lussac, 95031, Neuville sur Oise (France)

    2003-12-12

    Consider a circle of circumference 1. Throw at random n points, sequentially, on this circle and append clockwise an arc (or rod) of length s to each such point. The resulting random set (the free gas of rods) is a collection of a random number of clusters with random sizes. It models a free deposition process on a 1D substrate. For such processes, we shall consider the occurrence times (number of rods) and probabilities, as n grows, of the following configurations: those avoiding rod overlap (the hard-rod gas), those for which the largest gap is smaller than rod length s (the packing gas), those (parking configurations) for which hard rod and packing constraints are both fulfilled and covering configurations. Special attention is paid to the statistical properties of each such (rare) configuration in the asymptotic density domain when ns = {rho}, for some finite density {rho} of points. Using results from spacings in the random division of the circle, explicit large deviation rate functions can be computed in each case from state equations. Lastly, a process consisting in selecting at random one of these specific equilibrium configurations (called the observable) can be modelled. When particularized to the parking model, this system produces parking configurations differently from Renyi's random sequential adsorption model.

  1. Process of establishing design requirements and selecting alternative configurations for conceptual design of a VLA

    Directory of Open Access Journals (Sweden)

    Bo-Young Bae

    2017-04-01

    Full Text Available In this study, a process for establishing design requirements and selecting alternative configurations for the conceptual phase of aircraft design has been proposed. The proposed process uses system-engineering-based requirement-analysis techniques such as objective tree, analytic hierarchy process, and quality function deployment to establish logical and quantitative standards. Moreover, in order to perform a logical selection of alternative aircraft configurations, it uses advanced decision-making methods such as morphological matrix and technique for order preference by similarity to the ideal solution. In addition, a preliminary sizing tool has been developed to check the feasibility of the established performance requirements and to evaluate the flight performance of the selected configurations. The present process has been applied for a two-seater very light aircraft (VLA, resulting in a set of tentative design requirements and two families of VLA configurations: a high-wing configuration and a low-wing configuration. The resulting set of design requirements consists of three categories: customer requirements, certification requirements, and performance requirements. The performance requirements include two mission requirements for the flight range and the endurance by reflecting the customer requirements. The flight performances of the two configuration families were evaluated using the sizing tool developed and the low-wing configuration with conventional tails was selected as the best baseline configuration for the VLA.

  2. Risk-based configuration control

    International Nuclear Information System (INIS)

    Szikszai, T.

    1997-01-01

    The presentation discusses the following issues: The Configuration Control; The Risk-based Configuration Control (during power operation mode, and during shutdown mode). PSA requirements. Use of Risk-based Configuration Control System. Configuration Management (basic elements, benefits, information requirements)

  3. Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers

    International Nuclear Information System (INIS)

    DALE, R.N.

    2000-01-01

    Long Length Contaminated Equipment Removal System Receiver Trailer and Transport Trailer require a configuration management plan for design, requirements and operations baseline documents. This report serves as the plan for the Trailers

  4. Development of Simulator Configuration Tool

    International Nuclear Information System (INIS)

    Nedrelid, Olav; Pettersen, Geir

    1996-01-01

    The main objective of the development of a Simulator Configuration Tool (SCT) is to achieve faster and more efficient production of dynamic simulators. Through application of versatile graphical interfaces, the simulator builder should be able to configure different types of simulators including full-scope process simulators. The SCT should be able to serve different simulator environments. The configuration tool communicates with simulator execution environments through a TCP/IP-based interface, Communication with a Model Server System developed at Institutt for energiteknikk has been established and used as test case. The system consists of OSF/Motif dialogues for operations requiring textual input, list selections etc., and uses the Picasso-3 User Interface Management System to handle presentation of static and dynamic graphical information. (author)

  5. How engineering data management and system support the main process[-oriented] functions of a large-scale project

    CERN Document Server

    Hameri, A P

    1999-01-01

    By dividing the development process into successive functional operations, this paper studies the benefits of establishing configuration management procedures and of using an engineering data management systems (EDMS) in order to execute the tasks. The underlying environment is that of CERN and the ongoing, a decade long, Large Hadron Collider (LHC)-project. By identifying the main functional groups who will use the EDMS the paper outlines the basic motivations and services provided by such a system to each process function. The implications of strict configuration management on the daily operation of each functional user group are also discussed. The main argument of the paper is that each and every user of the EDMS must act in compliance with the configuration management procedures to guarantee the overall benefits from the system. The pilot EDMS being developed at CERN, which serves as a test-bed to discover the real functional needs of the organisation of an EDMS supports the conclusions. The preliminary ...

  6. Configuration management and change control at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Gheorghiu, Virgil

    1998-01-01

    Effective configuration management requires that: 1. the design basis of station structures, systems, equipment and components be maintained at all times; 2. only accurate and approved technical, operational and maintenance information is available for performance of station activities; 3. correct operating manuals, flowsheets, operating sequences, operating task and training manuals are prepared and maintained currently. Design Engineering at Cernavoda NPP is primarily the responsibility of the Engineering Services Department supported if necessary by the Technical Unit. The key elements needed to achieve excellence in design engineering support for station operation, including design process and implementation of modification are investigated by answering the questions: 1. What is the station expectation for design change control?; 2. How is this provided?. Concerning design, the following aspects are stressed: Detailed Design Development; Design Verification; Design Change Implementation. The present design process is auditable and well documented. It consists of detailed design development, and design output documents such as applicable drawings, procurement specifications, installation and test requirement and the results of design and safety reviews. The design change implementation does not proceed until an Inspection Test Plan has been developed and approved as required. (author)

  7. Relation between facial affect recognition and configural face processing in antipsychotic-free schizophrenia.

    Science.gov (United States)

    Fakra, Eric; Jouve, Elisabeth; Guillaume, Fabrice; Azorin, Jean-Michel; Blin, Olivier

    2015-03-01

    Deficit in facial affect recognition is a well-documented impairment in schizophrenia, closely connected to social outcome. This deficit could be related to psychopathology, but also to a broader dysfunction in processing facial information. In addition, patients with schizophrenia inadequately use configural information-a type of processing that relies on spatial relationships between facial features. To date, no study has specifically examined the link between symptoms and misuse of configural information in the deficit in facial affect recognition. Unmedicated schizophrenia patients (n = 30) and matched healthy controls (n = 30) performed a facial affect recognition task and a face inversion task, which tests aptitude to rely on configural information. In patients, regressions were carried out between facial affect recognition, symptom dimensions and inversion effect. Patients, compared with controls, showed a deficit in facial affect recognition and a lower inversion effect. Negative symptoms and lower inversion effect could account for 41.2% of the variance in facial affect recognition. This study confirms the presence of a deficit in facial affect recognition, and also of dysfunctional manipulation in configural information in antipsychotic-free patients. Negative symptoms and poor processing of configural information explained a substantial part of the deficient recognition of facial affect. We speculate that this deficit may be caused by several factors, among which independently stand psychopathology and failure in correctly manipulating configural information. PsycINFO Database Record (c) 2015 APA, all rights reserved.

  8. Effective Spend Management Through Electronic Reverse Auction Configurations

    Directory of Open Access Journals (Sweden)

    Mojmír Prídavok

    2013-07-01

    Full Text Available The purpose of the paper is to analyz wide range of possible auction strategies and configurations of eRA, with respect to the ever changing market conditions. Electronic reverse auction (eRA represents an electronic sourcing method of competitive bidding among a number of qualified suppliers. Theory assumes that eRA represents pure market environment with information perfectly distributed between both buyers and suppliers. Although initial eRA cost savings in B2B could be as high as 40%, without deeper knowledge of different auctions strategies and configurations, additional cost reductions are not possible. To identify crucial determinant, the statistical (correlation analysis on the data set of more than 18.000 auction items with different configuration parameters was conducted. Findings suggest that the more bidders are invited to the eRA, the better results could be expected. Additionally, the complexity of the eRA parameterization does not seem to influent the success of the eRA. These results can influence usage and SW development of eRA application in real environment. This research extends already realized studies in the field of electronic auctions for the B2B processes

  9. Configuration Management and Infrastructure Monitoring Using CFEngine and Icinga for Real-time Heterogeneous Data Taking Environment

    Science.gov (United States)

    Poat, M. D.; Lauret, J.; Betts, W.

    2015-12-01

    The STAR online computing environment is an intensive ever-growing system used for real-time data collection and analysis. Composed of heterogeneous and sometimes groups of custom-tuned machines, the computing infrastructure was previously managed by manual configurations and inconsistently monitored by a combination of tools. This situation led to configuration inconsistency and an overload of repetitive tasks along with lackluster communication between personnel and machines. Globally securing this heterogeneous cyberinfrastructure was tedious at best and an agile, policy-driven system ensuring consistency, was pursued. Three configuration management tools, Chef, Puppet, and CFEngine have been compared in reliability, versatility and performance along with a comparison of infrastructure monitoring tools Nagios and Icinga. STAR has selected the CFEngine configuration management tool and the Icinga infrastructure monitoring system leading to a versatile and sustainable solution. By leveraging these two tools STAR can now swiftly upgrade and modify the environment to its needs with ease as well as promptly react to cyber-security requests. By creating a sustainable long term monitoring solution, the detection of failures was reduced from days to minutes, allowing rapid actions before the issues become dire problems, potentially causing loss of precious experimental data or uptime.

  10. Configuration management of plant modifications for nuclear power plants

    International Nuclear Information System (INIS)

    Ritsch, W.J.

    1987-01-01

    Due to the increasing complexity of nuclear power plant operation, regulatory pressure, and the large numbers of people required to operate and support the stations, the control of plant modifications at these plants needs to be expanded and improved. The aerospace and defense industries, as well as the owners or operators of large energy projects have established configuration management programs (CMPs) to control plant design changes. These programs are composed of well-defined functions for identifying, evaluating, recording, tracking, issuing, and documenting the established baseline conditions, as well as required changes to these baseline conditions. The purpose of this paper is to describe a recommended CMP for plant modifications consisting of a computerized data base installed on the utility's computer to provide a central storage of plant design and operations data necessary to control the following activities as they are affected by plant design changes: training; record management; operations; maintenance; health physics; planning/scheduling; procurement/inventory control; outage management (including modifications); and emergency response

  11. Mac configuration management at the Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Marcus, Allan B [Los Alamos National Laboratory

    2010-01-01

    The Los Alamos National Laboratory (LANL) had a need for central configuration management of non-Windows computers. LANL has three to five thousand Macs and an equal number of Linux based systems. The primary goal was to be able to inventory all non-windows systems and patch Mc OS X systems. LANL examined a number of commercial and open source solutions and ultimately selected Puppet. This paper will discuss why we chose Puppet, how we implemented it, and some lessons we learned along the way.

  12. A novel BCI based on ERP components sensitive to configural processing of human faces

    Science.gov (United States)

    Zhang, Yu; Zhao, Qibin; Jing, Jin; Wang, Xingyu; Cichocki, Andrzej

    2012-04-01

    This study introduces a novel brain-computer interface (BCI) based on an oddball paradigm using stimuli of facial images with loss of configural face information (e.g., inversion of face). To the best of our knowledge, till now the configural processing of human faces has not been applied to BCI but widely studied in cognitive neuroscience research. Our experiments confirm that the face-sensitive event-related potential (ERP) components N170 and vertex positive potential (VPP) have reflected early structural encoding of faces and can be modulated by the configural processing of faces. With the proposed novel paradigm, we investigate the effects of ERP components N170, VPP and P300 on target detection for BCI. An eight-class BCI platform is developed to analyze ERPs and evaluate the target detection performance using linear discriminant analysis without complicated feature extraction processing. The online classification accuracy of 88.7% and information transfer rate of 38.7 bits min-1 using stimuli of inverted faces with only single trial suggest that the proposed paradigm based on the configural processing of faces is very promising for visual stimuli-driven BCI applications.

  13. Configuration management of modifications to nuclear power plants

    International Nuclear Information System (INIS)

    Capano, G.A.

    1983-01-01

    This paper examines Configuration Management (CM), which is a method of monitoring and controlling a power plant's data base to ensure that the data base remains consistent and reflects the physical characteristics of the plant. Myriad changes are imposed on power plant systems by regulatory requirements, operations, and administrative needs. This paper outlines the elements a CM program requires to track and assess the impacts of those changes on the data base, and to make necessary revisions. The paper notes several instances where CM has been used successfully, describes several practical applications of CM, and discusses potential cost savings that can be realized from these applications

  14. Windows PowerShell desired state configuration revealed

    CERN Document Server

    Chaganti, Ravikanth

    2014-01-01

    Desired State Configuration (DSC) is a powerful new configuration management platform that makes it easier than ever to perform cross-platform configuration management of your infrastructure, whether on-premise or in the cloud. DSC provides the management platform and Application Programming Interface (API) that can be used with any programming language. Windows PowerShell Desired State Configuration Revealed will take you through this new technology from start to finish and demonstrates the DSC interfaces through Windows PowerShell. DSC allows you to manage target devices by simply declarin

  15. User Involvement as a Configurable Integrated Product Delivery

    DEFF Research Database (Denmark)

    Vibæk, Kasper Sánchez

    2009-01-01

    as a configurable integrated product delivery then the architect can – using slightly provocatively a term from the production industry – be seen a configuration manager of processes shaping our physical surroundings. Products focusing on standardisation and mass customisation of the building process rather than......Integrated product deliveries as known from the product industry are beginning to emerge in construction. These are normally considered as physical systems that can be configured and customised for a specific delivery to form part of a unique construction project and help to reduce the complexity...... relevant field for development of customisable integrated product deliveries in construction. This development and its causes challenge the traditional role of the architect as the centre point in the creation of physical wholes or entireties. If user involvement, as argued, can be considered...

  16. A Common Software Configuration Management System for CERN SPS and LEP Accelerators and Technical Services

    CERN Document Server

    Hatziangeli, Eugenia; Bragg, A E; Ninin, P; Patino, J; Sobczak, H

    1999-01-01

    Software configuration management activities are crucial to assure the integrity of current operational and the quality of new software either being developed at CERN or outsourced. The functionality of the present management system became insufficient with large maintenance overheads. In order to improve our situation, a new software configuration management system has been set up. It is based on Razor, a commercial tool, which supports the management of file versions and operational software releases, along with integrated problem reporting capabilities. In addition to the basic tool functionality, automated procedures were custom made, for the installation and distribution of operational software. Policies were developed and applied over the software development life cycle to provide visibility and control. The system ensures that, at all times, the status and location of all deliverable versions are known, the state of shared objects is carefully controlled and unauthorised changes prevented. It provides ...

  17. A Common Software-Configuration Management System for CERN SPS and LEP Accelerators and Technical Services

    CERN Document Server

    Hatziangeli, Eugenia; Bragg, A E; Ninin, P; Patino, J; Sobczak, H

    2000-01-01

    Software-configuration management activities are crucial to ensure the integrity of current operational software and the quality of new software either being developed at CERN or outsourced. The functionality of the present management system became insufficient with large maintenance overheads. In order to improve our situation, a new software-configuration management system has been set up. It is based on Razor R, a commercial tool, which supports the management of file versions and operational software releases, along with integrated problem-reporting capabilities. In addition to the basic tool functionality, automated procedures were custom-made for the installation and distribution of operational software. The system ensures that, at all times, the status and location of all deliverable versions are known, the state of shared objects is carefully controlled and unauthorized changes prevented. This paper outlines the reasons for selecting the chosen tool, the implementation of the system and the final goal...

  18. The effect of texture on face identification and configural information processing

    Directory of Open Access Journals (Sweden)

    Tzschaschel Eva Alica

    2014-01-01

    Full Text Available Shape and texture are an integral part of face identity. In the present study, the importance of face texture for face identification and detection of configural manipulation (i.e., spatial relation among facial features was examined by comparing grayscale face photographs (i.e., real faces and line drawings of the same faces. Whereas real faces provide information about texture and shape of faces, line drawings are lacking texture cues. A change-detection task and a forced-choice identification task were used with both stimuli categories. Within the change detection task, participants had to decide whether the size of the eyes of two sequentially presented faces had changed or not. After having made this decision, three faces were shown to the subjects and they had to identify the previously shown face among them. Furthermore, context (full vs. cropped faces and orientation (upright vs. inverted were manipulated. The results obtained in the change detection task suggest that configural information was used in processing real faces, while part-based and featural information was used in processing line-drawings. Additionally, real faces were identified more accurately than line drawings, and identification was less context but more orientation sensitive than identification of line drawings. Taken together, the results of the present study provide new evidence stressing the importance of face texture for identity encoding and configural face processing.

  19. A Configurable Surface-Electrode Ion Trap Design for Quantum Information Processing

    International Nuclear Information System (INIS)

    Liu Wei; Chen Shu-Ming; Chen Ping-Xing; Wu Wei

    2013-01-01

    We propose a configurable surface-electrode ion trap design to alleviate the poor reusability of the existing traps. It can architecturally and electrically support 5 mainstream modes by design reuse, thus enhancing the trap reusability and reducing the experiment setup overhead. We also develop a corresponding simulation suite which can optimize trap geometries and calculate trap parameters to control the trapped ion's classic motion. According to our analytical and simulated results, the configurable design can serve as a unified platform for basic research of large-scale quantum information processing

  20. TWRS authorization basis configuration control summary

    International Nuclear Information System (INIS)

    Mendoza, D.P.

    1997-01-01

    This document was developed to define the Authorization Basis management functional requirements for configuration control, to evaluate the management control systems currently in place, and identify any additional controls that may be required until the TWRS [Tank Waste Remediation System] Configuration Management system is fully in place

  1. Impaired configural body processing in anorexia nervosa: evidence from the body inversion effect.

    Science.gov (United States)

    Urgesi, Cosimo; Fornasari, Livia; Canalaz, Francesca; Perini, Laura; Cremaschi, Silvana; Faleschini, Laura; Thyrion, Erica Zappoli; Zuliani, Martina; Balestrieri, Matteo; Fabbro, Franco; Brambilla, Paolo

    2014-11-01

    Patients with anorexia nervosa (AN) suffer from severe disturbances of body perception. It is unclear, however, whether such disturbances are linked to specific alterations in the processing of body configurations with respect to the local processing of body part details. Here, we compared a consecutive sample of 12 AN patients with a group of 12 age-, gender- and education-matched controls using an inversion effect paradigm requiring the visual discrimination of upright and inverted pictures of whole bodies, faces and objects. The AN patients presented selective deficits in the discrimination of upright body stimuli, which requires configural processing. Conversely, patients and controls showed comparable abilities in the discrimination of inverted bodies, which involves only detail-based processing, and in the discrimination of both upright and inverted faces and objects. Importantly, the body inversion effect negatively correlated with the persistence scores at the Temperament and Character Inventory, which evaluates increased tendency to convert a signal of punishment into a signal of reinforcement. These results suggest that the deficits of configural processing in AN patients may be associated with their obsessive worries about body appearance and to the excessive attention to details that characterizes their general perceptual style. © 2013 The British Psychological Society.

  2. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    International Nuclear Information System (INIS)

    ROOT, R.W.

    1999-01-01

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems

  3. A linear program for optimal configurable business processes deployment into cloud federation

    NARCIS (Netherlands)

    Rekik, M.; Boukadi, K.; Assy, N.; Gaaloul, W.; Ben-Abdallah, H.; Zhang, J.; Miller, J.A.; Xu, X.

    2016-01-01

    A configurable process model is a generic model from which an enterprise can derive and execute process variants that meet its specific needs and contexts. With the advent of cloud computing and its economic pay-per-use model, enterprises are increasingly outsourcing partially or totally their

  4. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  5. Detailed requirements document for Stowage List and Hardware Tracking System (SLAHTS). [computer based information management system in support of space shuttle orbiter stowage configuration

    Science.gov (United States)

    Keltner, D. J.

    1975-01-01

    The stowage list and hardware tracking system, a computer based information management system, used in support of the space shuttle orbiter stowage configuration and the Johnson Space Center hardware tracking is described. The input, processing, and output requirements that serve as a baseline for system development are defined.

  6. Project B610 process control configuration acceptance test procedure

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1994-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator's console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A

  7. Development of an equipment management model to improve effectiveness of processes

    International Nuclear Information System (INIS)

    Chang, H. S.; Ju, T. Y.; Song, T. Y.

    2012-01-01

    The nuclear industries have developed and are trying to create a performance model to improve effectiveness of the processes implemented at nuclear plants in order to enhance performance. Most high performing nuclear stations seek to continually improve the quality of their operations by identifying and closing important performance gaps. Thus, many utilities have implemented performance models adjusted to their plant's configuration and have instituted policies for such models. KHNP is developing a standard performance model to integrate the engineering processes and to improve the inter-relation among processes. The model, called the Standard Equipment Management Model (SEMM), is under development first by focusing on engineering processes and performance improvement processes related to plant equipment used at the site. This model includes performance indicators for each process that can allow evaluating and comparing the process performance among 21 operating units. The model will later be expanded to incorporate cost and management processes. (authors)

  8. Configuration Management Program Application at KNPP Units 5 and 6 Modernization Program

    International Nuclear Information System (INIS)

    Manchev, B.; Yordanova, V.; Nenkova, B.

    2006-01-01

    The need for Configuration Management Program development, became very clear after the initiation of the Modernization Program for Units 5and6, because KNPP personnel needed a good and safe way to control the huge amount of data which were transferred into two directions - input data (design and operational documents from KNPP to Contractors) and the design, vendor, procurement, etc. documents (from Contractors to KNPP). Moreover, most of the measures are in fact design changes and it appeared to be extremely important to track these design changes and their reflection into design and operational documents. It is even more important to obtain a successful transfer of all this information to the operating organization (EP-2) after the completion. The proposal for development of Configuration Management (CM) Program for KNPP Units 5and6 Modernization program was divided into three phases: 1. Information Control (Document Control and Records Management) 2.Technical Decision System (Change Control) 3. Master Equipment List (MEL), (as part of the Design requirements element) Information Control Element was chosen to be developed first. Implementation of Information Control element comprised of: Review and assessment of existing situation (procedures for document control and records Management), Development of new/revision of existing procedure for Document Control and Records Management, Development of SmartDoc software application in support of document control and records management and for measure documentation tracking (with its specifics), Data entry for MP5and6 measures, Implementation at EP-2 (with successful data migration from the existing databases). The SmartDoc development was completed at the end of 2002 and after a testing period it was implemented at Modernization and Investment Department first. Then the data for documents were transferred from the existing databases at EP-2 and the system was implemented at EP-2 and other KNPP facilities. Development

  9. Configuration management and load monitoring procedures for nuclear plant structures

    International Nuclear Information System (INIS)

    Chu, S.L.; Skaczylo, A.T.

    1990-01-01

    This paper describes a computer-aided engineering tool called the Load Monitoring System (LMS) that was proven effective for monitoring floor framing, loads, and structural integrity. The system links structural analysis, design investigation, and reporting and automated drafting programs with a Data Base Management System (DBMS). It provides design engineers with a powerful tool for quickly incorporating, tracking, and assessing load revisions and determining effects on steel floor framing members and connections, thereby helping to reduce design man-hours, minimize the impact of structural modifications, and maintain and document the design baseline. The major benefit to utilities are the reduction in engineering costs, assistance with plant configuration management, and assurance of structural safety throughout the operating life of a nuclear plant and at evaluation for license renewal. (orig./HP)

  10. Hybrid indirect/direct contactor for thermal management of counter-current processes

    Science.gov (United States)

    Hornbostel, Marc D.; Krishnan, Gopala N.; Sanjurjo, Angel

    2018-03-20

    The invention relates to contactors suitable for use, for example, in manufacturing and chemical refinement processes. In an aspect is a hybrid indirect/direct contactor for thermal management of counter-current processes, the contactor comprising a vertical reactor column, an array of interconnected heat transfer tubes within the reactor column, and a plurality of stream path diverters, wherein the tubes and diverters are configured to block all straight-line paths from the top to bottom ends of the reactor column.

  11. Process management using component thermal-hydraulic function classes

    Science.gov (United States)

    Morman, J.A.; Wei, T.Y.C.; Reifman, J.

    1999-07-27

    A process management expert system where following malfunctioning of a component, such as a pump, for determining system realignment procedures such as for by-passing the malfunctioning component with on-line speeds to maintain operation of the process at full or partial capacity or to provide safe shut down of the system while isolating the malfunctioning component. The expert system uses thermal-hydraulic function classes at the component level for analyzing unanticipated as well as anticipated component malfunctions to provide recommended sequences of operator actions. Each component is classified according to its thermal-hydraulic function, and the generic and component-specific characteristics for that function. Using the diagnosis of the malfunctioning component and its thermal hydraulic class, the expert system analysis is carried out using generic thermal-hydraulic first principles. One aspect of the invention employs a qualitative physics-based forward search directed primarily downstream from the malfunctioning component in combination with a subsequent backward search directed primarily upstream from the serviced component. Generic classes of components are defined in the knowledge base according to the three thermal-hydraulic functions of mass, momentum and energy transfer and are used to determine possible realignment of component configurations in response to thermal-hydraulic function imbalance caused by the malfunctioning component. Each realignment to a new configuration produces the accompanying sequence of recommended operator actions. All possible new configurations are examined and a prioritized list of acceptable solutions is produced. 5 figs.

  12. Process management using component thermal-hydraulic function classes

    Science.gov (United States)

    Morman, James A.; Wei, Thomas Y. C.; Reifman, Jaques

    1999-01-01

    A process management expert system where following malfunctioning of a component, such as a pump, for determining system realignment procedures such as for by-passing the malfunctioning component with on-line speeds to maintain operation of the process at full or partial capacity or to provide safe shut down of the system while isolating the malfunctioning component. The expert system uses thermal-hydraulic function classes at the component level for analyzing unanticipated as well as anticipated component malfunctions to provide recommended sequences of operator actions. Each component is classified according to its thermal-hydraulic function, and the generic and component-specific characteristics for that function. Using the diagnosis of the malfunctioning component and its thermal hydraulic class, the expert system analysis is carried out using generic thermal-hydraulic first principles. One aspect of the invention employs a qualitative physics-based forward search directed primarily downstream from the malfunctioning component in combination with a subsequent backward search directed primarily upstream from the serviced component. Generic classes of components are defined in the knowledge base according to the three thermal-hydraulic functions of mass, momentum and energy transfer and are used to determine possible realignment of component configurations in response to thermal-hydraulic function imbalance caused by the malfunctioning component. Each realignment to a new configuration produces the accompanying sequence of recommended operator actions. All possible new configurations are examined and a prioritized list of acceptable solutions is produced.

  13. Space shuttle configuration accounting functional design specification

    Science.gov (United States)

    1974-01-01

    An analysis is presented of the requirements for an on-line automated system which must be capable of tracking the status of requirements and engineering changes and of providing accurate and timely records. The functional design specification provides the definition, description, and character length of the required data elements and the interrelationship of data elements to adequately track, display, and report the status of active configuration changes. As changes to the space shuttle program levels II and III configuration are proposed, evaluated, and dispositioned, it is the function of the configuration management office to maintain records regarding changes to the baseline and to track and report the status of those changes. The configuration accounting system will consist of a combination of computers, computer terminals, software, and procedures, all of which are designed to store, retrieve, display, and process information required to track proposed and proved engineering changes to maintain baseline documentation of the space shuttle program levels II and III.

  14. Analyzing the Accuracy of Calculations When Scoping Product Configuration Projects

    DEFF Research Database (Denmark)

    Bonev, Martin; Hvam, Lars

    2012-01-01

    Product configurators have increasingly been applied in industrial environments. With their help, companies providing customized products have managed to redesign their specification processes and to better handle the growing product variety. But despite the promising benefits, conducting...

  15. C-shaped root canal configuration in mandibular second premolar: Report of an unusual case and its endodontic management

    Directory of Open Access Journals (Sweden)

    Dipali Y Shah

    2012-01-01

    Full Text Available The C-shaped root canal system is an aberration of the root canal system in which a characteristic fin or web connects individual canals, resulting in a C-shaped cross section. This configuration has been rarely reported in the mandibular second premolar. The only other known reported case of a C-shaped canal, with its configuration, in relation to mandibular second premolar is of an extracted tooth. The purpose of this report is to describe the diagnosis, configuration and endodontic management of C-shaped root canal in mandibular second premolar. Clinical techniques to addresses the challenges in endodontic disinfection as well as cleaning and shaping of the C-shaped canal, which is prone to endodontic mishaps, are also discussed in this case report. Reporting of this case emphasizes the need and added advantage of using the dental operating microscope hand in hand with conventional radiography in management of the C-shaped root canal configuration.

  16. The impact of configural superiority on the processing of spatial information.

    Science.gov (United States)

    Bratch, Alexander; Barr, Shawn; Bromfield, W Drew; Srinath, Aparna; Zhang, Jack; Gold, Jason M

    2016-09-01

    The impact of context on perception has been well documented for over a century. In some cases, the introduction of context to a set of target features may produce a unified percept, leading to a quicker and more accurate classification; a configural superiority effect (Pomerantz, Sager, & Stoever, 1977). Although this effect has been well characterized in terms of the stimulus features that produce the effect, the specific impact context has on the spatial strategies adopted by observers when making perceptual judgments remains unclear. Here, we sought to address this question by using the methods of response classification and ideal observer analysis. In our main experiment, we used a stimulus set known to produce the configural superiority effect and found that although observers were faster in the presence of context, they were actually less efficient at extracting stimulus information. This surprising result was attributable to the use of a spatial strategy in which observers relied on redundant, noninformative features in the presence of context. A control experiment ruled out the possibility that the mere presence of added context led to these strategic shifts. Our results support previous notions about the nature of the perceptual shifts that are induced by the configural superiority effect. However, they also show that configural processing is more nuanced than originally thought: Although observers may be faster at making judgments when context induces the percept of a configural whole, there appears to be a hidden cost in terms of the efficiency with which information is used. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  17. Tolerance for distorted faces: challenges to a configural processing account of familiar face recognition.

    Science.gov (United States)

    Sandford, Adam; Burton, A Mike

    2014-09-01

    Face recognition is widely held to rely on 'configural processing', an analysis of spatial relations between facial features. We present three experiments in which viewers were shown distorted faces, and asked to resize these to their correct shape. Based on configural theories appealing to metric distances between features, we reason that this should be an easier task for familiar than unfamiliar faces (whose subtle arrangements of features are unknown). In fact, participants were inaccurate at this task, making between 8% and 13% errors across experiments. Importantly, we observed no advantage for familiar faces: in one experiment participants were more accurate with unfamiliars, and in two experiments there was no difference. These findings were not due to general task difficulty - participants were able to resize blocks of colour to target shapes (squares) more accurately. We also found an advantage of familiarity for resizing other stimuli (brand logos). If configural processing does underlie face recognition, these results place constraints on the definition of 'configural'. Alternatively, familiar face recognition might rely on more complex criteria - based on tolerance to within-person variation rather than highly specific measurement. Copyright © 2014 Elsevier B.V. All rights reserved.

  18. Configuration Control Office

    CERN Multimedia

    Beltramello, O

    In order to enable Technical Coordination to manage the detector configuration and to be aware of all changes in this configuration, a baseline of the envelopes has been created in April 2001. Fifteen system and multi-system envelope drawings have been approved and baselined. An EDMS file is associated with each approved envelope, which provides a list of the current known unsolved conflicts related to the envelope and a list of remaining drawing inconsistencies to be corrected. The envelope status with the associated drawings and EDMS file can be found on the web at this adress: http://atlasinfo.cern.ch/Atlas/TCOORD/Activities/Installation/Configuration/ Any modification in the baseline has to be requested via the Engineering Change Requests. The procedure can be found under: http://atlasinfo.cern.ch/Atlas/TCOORD/Activities/TcOffice/Quality/ECR/ TC will review all the systems envelopes in the near future and manage conflict resolution with the collaboration of the systems.

  19. A Configuration Model of Organizational Culture

    Directory of Open Access Journals (Sweden)

    Daniel Dauber

    2012-01-01

    Full Text Available The article proposes a configuration model of organizational culture, which explores dynamic relationships between organizational culture, strategy, structure, and operations of an organization (internal environment and maps interactions with the external environment (task and legitimization environment. A major feature of the configuration model constitutes its well-defined processes, which connect the elements of the model systematically to each other, such as single- and double-loop learning, operationalization of strategies, legitimization management, and so on. The model is grounded in a large review of literature in different research areas and builds on widely recognized models in the field of organization and culture theory. It constitutes a response to the call for new models, which are able to explain and facilitate the exploration of the empirical complexity that organizations face today. The configuration model of organizational culture is of particular interest to scholars who investigate into cultural phenomena and change over time.

  20. Model-Driven Configuration of SELinux Policies

    Science.gov (United States)

    Agreiter, Berthold; Breu, Ruth

    The need for access control in computer systems is inherent. However, the complexity to configure such systems is constantly increasing which affects the overall security of a system negatively. We think that it is important to define security requirements on a non-technical level while taking the application domain into respect in order to have a clear and separated view on security configuration (i.e. unblurred by technical details). On the other hand, security functionality has to be tightly integrated with the system and its development process in order to provide comprehensive means of enforcement. In this paper, we propose a systematic approach based on model-driven security configuration to leverage existing operating system security mechanisms (SELinux) for realising access control. We use UML models and develop a UML profile to satisfy these needs. Our goal is to exploit a comprehensive protection mechanism while rendering its security policy manageable by a domain specialist.

  1. 77 FR 50727 - Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear...

    Science.gov (United States)

    2012-08-22

    ... enhanced consensus practices for planning software configuration management (SCM) as described in the... testing of structures, systems, and components important to safety throughout the life of the unit. This...

  2. A novel configurable VLSI architecture design of window-based image processing method

    Science.gov (United States)

    Zhao, Hui; Sang, Hongshi; Shen, Xubang

    2018-03-01

    Most window-based image processing architecture can only achieve a certain kind of specific algorithms, such as 2D convolution, and therefore lack the flexibility and breadth of application. In addition, improper handling of the image boundary can cause loss of accuracy, or consume more logic resources. For the above problems, this paper proposes a new VLSI architecture of window-based image processing operations, which is configurable and based on consideration of the image boundary. An efficient technique is explored to manage the image borders by overlapping and flushing phases at the end of row and the end of frame, which does not produce new delay and reduce the overhead in real-time applications. Maximize the reuse of the on-chip memory data, in order to reduce the hardware complexity and external bandwidth requirements. To perform different scalar function and reduction function operations in pipeline, this can support a variety of applications of window-based image processing. Compared with the performance of other reported structures, the performance of the new structure has some similarities to some of the structures, but also superior to some other structures. Especially when compared with a systolic array processor CWP, this structure at the same frequency of approximately 12.9% of the speed increases. The proposed parallel VLSI architecture was implemented with SIMC 0.18-μm CMOS technology, and the maximum clock frequency, power consumption, and area are 125Mhz, 57mW, 104.8K Gates, respectively, furthermore the processing time is independent of the different window-based algorithms mapped to the structure

  3. Optimization of a Gas Switching Combustion process through advanced heat management strategies

    International Nuclear Information System (INIS)

    Cloete, Schalk; Zaabout, Abdelghafour; Romano, Matteo C.; Chiesa, Paolo; Lozza, Giovanni; Gallucci, Fausto; Sint Annaland, Martin van; Amini, Shahriar

    2017-01-01

    Highlights: • GSC is a promising new reactor concept for power production with cost effective CO 2 capture. • The standalone fluidized bed reactors employed will allow for easy process scale-up. • The GSC simple configuration achieves higher efficiencies than conventional solutions. • Further increases in efficiency can be achieved via advanced heat management. • The 41.9% maximum efficiency is in line with other CLC–IGCC configurations. - Abstract: Gas Switching Combustion (GSC) is a promising new process concept for energy efficient power production with integrated CO 2 capture. In comparison to conventional Chemical Looping Combustion (CLC) carried out in interconnected fluidized beds, the GSC concept will be substantially easier to design and scale up, especially for pressurized conditions. One potential drawback of the GSC concept is the gradual temperature variation over the transient process cycle, which leads to a drop in electric efficiency of the plant. This article investigates heat management strategies to mitigate this issue both through simulations and experiments. Simulation studies of the GSC concept integrated into an IGCC power plant show that heat management using a nitrogen recycle stream can increase plant efficiency by 3 percentage points to 41.6% while maintaining CO 2 capture ratios close to 90%. Reactive multiphase flow simulations of the GSC reactor also showed that heat management can eliminate fuel slip problems. In addition, the GSC concept offers the potential to remove the need for a nitrogen recycle stream by implementing a concentrated air injection that extracts heat while only a small percentage of oxygen reacts. Experiments have shown that, similar to nitrogen recycle, this strategy reduces transient temperature variations across the cycle and therefore merits further investigation.

  4. Integrated water management system - Description and test results. [for Space Station waste water processing

    Science.gov (United States)

    Elden, N. C.; Winkler, H. E.; Price, D. F.; Reysa, R. P.

    1983-01-01

    Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.

  5. Heat flux management via advanced magnetic divertor configurations and divertor detachment

    Energy Technology Data Exchange (ETDEWEB)

    Kolemen, E., E-mail: ekolemen@princeton.edu [Princeton University, Princeton, NJ 08544 (United States); Allen, S.L. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Bray, B.D. [General Atomics, PO Box 85608, San Diego, CA 92186-5608 (United States); Fenstermacher, M.E. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Humphreys, D.A.; Hyatt, A.W. [General Atomics, PO Box 85608, San Diego, CA 92186-5608 (United States); Lasnier, C.J. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Leonard, A.W. [General Atomics, PO Box 85608, San Diego, CA 92186-5608 (United States); Makowski, M.A.; McLean, A.G. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Maingi, R.; Nazikian, R. [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States); Petrie, T.W. [General Atomics, PO Box 85608, San Diego, CA 92186-5608 (United States); Soukhanovskii, V.A. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Unterberg, E.A. [Oak Ridge National Laboratory, PO Box 2008, Oak Ridge, TN 37831 (United States)

    2015-08-15

    The snowflake divertor (SFD) control and detachment control to manage the heat flux at the divertor are successfully demonstrated at DIII-D. Results of the development and implementation of these two heat flux reduction control methods are presented. The SFD control algorithm calculates the position of the two null-points in real-time and controls shaping coil currents to achieve and stabilize various snowflake configurations. Detachment control stabilizes the detachment front fixed at specified distance between the strike point and the X-point throughout the shot.

  6. Configuration management plan for Machine Interface Test System (MITS)

    International Nuclear Information System (INIS)

    O'Neill, C.K.

    1980-01-01

    The discipline required by this plan will apply from the establishment of a configuration baseline until completion of the final test in the MITS. The plan applies to configured items of hardware and software as well as to the specifications and drawings for these items. The plan encompasses establishment of the facility baseline, interface definition, classes of change, change control, change paper, organizational responsibilities and relationships, test configuration (as opposed to facility), and configuration data retention

  7. 7 Processes that Enable NASA Software Engineering Technologies: Value-Added Process Engineering

    Science.gov (United States)

    Housch, Helen; Godfrey, Sally

    2011-01-01

    The presentation reviews Agency process requirements and the purpose, benefits, and experiences or seven software engineering processes. The processes include: product integration, configuration management, verification, software assurance, measurement and analysis, requirements management, and planning and monitoring.

  8. Implementation of Successful Practices Using an Iterative Development Methodology for an AEGIS Configuration Management Software Application

    National Research Council Canada - National Science Library

    Colston, Sharon

    1998-01-01

    This paper documents a two-and-a-half year software development project of the Combat Systems Configuration Management Branch of the Combat Systems Department at Naval Surface Warfare Center, Dahlgren Division (NSWCDD...

  9. ANALYSIS OF SPECIAL WASTE CONFIGURATIONS AT THE SRS WASTE MANAGEMENT FACILITIES

    International Nuclear Information System (INIS)

    Casella, V; Raymond Dewberry, R

    2007-01-01

    Job Control Waste (JCW) at the Savannah River Site (SRS) Solid Waste Management Facilities (SWMF) may be disposed of in special containers, and the analysis of these containers requires developing specific analysis methodologies. A method has been developed for the routine assay of prohibited items (liquids, etc.) contained in a 30-gallon drum that is then placed into a 55-gallon drum. Method development consisted of system calibration with a NIST standard at various drum-to-detector distances, method verification with a liquid sample containing a known amount of Pu-238, and modeling the inner container using Ortec Isotopic software. Using this method for measurement of the known standard in the drum-in-drum configuration produced excellent agreement (within 15%) with the known value. Savannah River Site Solid Waste Management also requested analysis of waste contained in large black boxes (commonly 18-feet x 12-feet x 7-feet) stored at the SWMF. These boxes are frequently stored in high background areas and background radiation must be considered for each analysis. A detection limit of less than 150 fissile-gram-equivalents (FGE) of TRU waste is required for the black-box analyses. There is usually excellent agreement for the measurements at different distances and measurement uncertainties of about 50% are obtained at distances of at least twenty feet from the box. This paper discusses the experimental setup, analysis and data evaluation for drum-in-drum and black box waste configurations at SRS

  10. Applying Product Configuration Systems in Engineering Companies

    DEFF Research Database (Denmark)

    Ladeby, Klaes Rohde

    This Ph.D. thesis looks into the application of configuration systems in engineering companies, and how configuration systems can be used to support business processes in engineering companies. Often the motivation stated by researchers and practitioners is, that a configuration project...... and sustain competitive advantage” (Teece, Pisano, & Shuen, 1997, pp.509) This question has puzzled academics and preoccupied managers for the last century. Yet, it seems there is still no consensus regarding the meaning of strategy, and how strategy works. Type in the word “strategy” on Amazon.co.uk and 76......,133 books apply. Type it in on Google scholar and 8,580,000 homepages apply3. Obviously, strategy is an important subject. However, the subject also seems to be difficult to perceive. Although this thesis is not about strategy, or strategizing, I would like to pursue the definition of strategy one step...

  11. Supply strategy configuration in fragmented production systems: An empirical study

    Directory of Open Access Journals (Sweden)

    Claudia Chackelson

    2013-07-01

    Full Text Available Purpose: Companies survive in saturated markets trying to be more productive and more efficient. In this context, it becomes critical for companies to manage the entire supply network to optimize overall performance.  Hence, the supply strategy plays an important role because it influences the way in which production and logistics network has to be configured and managed. This paper explores the benefits obtained configuring different supply strategies adapted to customer needs.Design/methodology/approach: For this purpose a case research from a Tier 2 point of view of the supply chain has been conducted. Findings and Originality/value: The case research demonstrates that a higher service level, less holding costs and increase turnovers can be obtained implementing the adequate supply strategy. Originality/value: There is a scarcity of research specifically focused on applied Supply Chain Principles within network configuration processes. Moreover, there are few empirical studies of global Tier 2 with multiple decoupling points into its supply chain network.

  12. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  13. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    International Nuclear Information System (INIS)

    Dobson, D.; Churby, A.; Krieger, E.; Maloy, D.; White, K.

    2011-01-01

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance and Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  14. Design of a flight director/configuration management system for piloted STOL approaches

    Science.gov (United States)

    Hoh, R. H.; Klein, R. H.; Johnson, W. A.

    1973-01-01

    The design and characteristics of a flight director for V/STOL aircraft are discussed. A configuration management system for piloted STOL approaches is described. The individual components of the overall system designed to reduce pilot workload to an acceptable level during curved, decelerating, and descending STOL approaches are defined. The application of the system to augmentor wing aircraft is analyzed. System performance checks and piloted evaluations were conducted on a flight simulator and the results are summarized.

  15. Configuring the Orion Guidance, Navigation, and Control Flight Software for Automated Sequencing

    Science.gov (United States)

    Odegard, Ryan G.; Siliwinski, Tomasz K.; King, Ellis T.; Hart, Jeremy J.

    2010-01-01

    The Orion Crew Exploration Vehicle is being designed with greater automation capabilities than any other crewed spacecraft in NASA s history. The Guidance, Navigation, and Control (GN&C) flight software architecture is designed to provide a flexible and evolvable framework that accommodates increasing levels of automation over time. Within the GN&C flight software, a data-driven approach is used to configure software. This approach allows data reconfiguration and updates to automated sequences without requiring recompilation of the software. Because of the great dependency of the automation and the flight software on the configuration data, the data management is a vital component of the processes for software certification, mission design, and flight operations. To enable the automated sequencing and data configuration of the GN&C subsystem on Orion, a desktop database configuration tool has been developed. The database tool allows the specification of the GN&C activity sequences, the automated transitions in the software, and the corresponding parameter reconfigurations. These aspects of the GN&C automation on Orion are all coordinated via data management, and the database tool provides the ability to test the automation capabilities during the development of the GN&C software. In addition to providing the infrastructure to manage the GN&C automation, the database tool has been designed with capabilities to import and export artifacts for simulation analysis and documentation purposes. Furthermore, the database configuration tool, currently used to manage simulation data, is envisioned to evolve into a mission planning tool for generating and testing GN&C software sequences and configurations. A key enabler of the GN&C automation design, the database tool allows both the creation and maintenance of the data artifacts, as well as serving the critical role of helping to manage, visualize, and understand the data-driven parameters both during software development

  16. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization

  17. Development and implementation of product configuration systems - a change management perspective

    DEFF Research Database (Denmark)

    Møldrup, Morten; Møller, Niels

    2004-01-01

    Product configuration systems (PCS) are IT-based expert systems, which contain product information and knowledge and in turn provide the basis for automating the decision-making processes in the order acquisition phase. Thereby PCS support and streamline the efforts of an organisations sales force...... in translating customer demands into customized products within a bounded range of product variation. Supported by a PCS the sales representatives are empowered to configure products without having to consult experts about product specific dependencies. Although several research projects have been carried out...... within the field of PCS, these efforts have primarily been focused on technical aspects. Based on experiences gained from twelve case studies in the context of the PETO (*) project, this article therefore sets out to broaden the scope of the PCS field to embrace managerial and organizational aspects...

  18. The Design and Analysis of Virtual Network Configuration for a Wireless Mobile ATM Network

    Science.gov (United States)

    Bush, Stephen F.

    1999-05-01

    This research concentrates on the design and analysis of an algorithm referred to as Virtual Network Configuration (VNC) which uses predicted future states of a system for faster network configuration and management. VNC is applied to the configuration of a wireless mobile ATM network. VNC is built on techniques from parallel discrete event simulation merged with constraints from real-time systems and applied to mobile ATM configuration and handoff. Configuration in a mobile network is a dynamic and continuous process. Factors such as load, distance, capacity and topology are all constantly changing in a mobile environment. The VNC algorithm anticipates configuration changes and speeds the reconfiguration process by pre-computing and caching results. VNC propagates local prediction results throughout the VNC enhanced system. The Global Positioning System is an enabling technology for the use of VNC in mobile networks because it provides location information and accurate time for each node. This research has resulted in well defined structures for the encapsulation of physical processes within Logical Processes and a generic library for enhancing a system with VNC. Enhancing an existing system with VNC is straight forward assuming the existing physical processes do not have side effects. The benefit of prediction is gained at the cost of additional traffic and processing. This research includes an analysis of VNC and suggestions for optimization of the VNC algorithm and its parameters.

  19. A parallel optimization method for product configuration and supplier selection based on interval

    Science.gov (United States)

    Zheng, Jian; Zhang, Meng; Li, Guoxi

    2017-06-01

    In the process of design and manufacturing, product configuration is an important way of product development, and supplier selection is an essential component of supply chain management. To reduce the risk of procurement and maximize the profits of enterprises, this study proposes to combine the product configuration and supplier selection, and express the multiple uncertainties as interval numbers. An integrated optimization model of interval product configuration and supplier selection was established, and NSGA-II was put forward to locate the Pareto-optimal solutions to the interval multiobjective optimization model.

  20. A novel design of reactive distillation configuration for 2-methoxy-2-methylheptane process

    Directory of Open Access Journals (Sweden)

    Hussain Arif

    2017-01-01

    Full Text Available The study aims to reveal the possibility of reactive distillation (RD in the 2-methoxy-2-methylheptane (MMH production process. MMH is getting more industrial and academic interests as a gasoline additive to replace methyl tert-butyl ether. Traditionally, MMH is obtained by carrying out the reaction in the reactor followed by three distillation columns. The high yield of MMH could be achieved by keeping the large reactor size or by using the large excess of 2-methyl-1-heptene (MH. Both former and latter strategies are associated with the high capital and operating costs. To solve these problems, this study proposed an innovative RD configuration to take synergistic benefits of reaction and separation involved. This innovative RD configuration allows the production of MMH with significantly lower capital, operating and total annual costs. For desired MMH yield, the result demonstrates that the proposed RD configuration can reduce energy, capital, and total annual costs up to 7.7, 31.3, and 17.1%, respectively, compared to a conventional process. Furthermore, the influence of some important design parameters on the RD column performance was also explored to overcome the temperature limitation of acid resin catalyst inside the reactive zone of the RD column.

  1. Dynamic Model-Based Evaluation of Process Configurations for Integrated Operation of Hydrolysis and Co-Fermentation for Bioethanol Production from Lignocellulose

    DEFF Research Database (Denmark)

    Morales Rodriguez, Ricardo; Meyer, Anne S.; Gernaey, Krist

    2011-01-01

    In this study a number of different process flowsheets were generated and their feasibility evaluated using simulations of dynamic models. A dynamic modeling framework was used for the assessment of operational scenarios such as, fed-batch, continuous and continuous with recycle configurations. E......) operating in continuous mode with a recycle of the SSCF reactor effluent, results in the best productivity of bioethanol among the proposed process configurations, with a yield of 0.18 kg ethanol/kg dry-biomass........ Each configuration was evaluated against the following benchmark criteria, yield (kg ethanol/kg dry-biomass), final product concentration and number of unit operations required in the different process configurations. The results show that simultaneous saccharification and co-fermentation (SSCF...

  2. [Process orientation as a tool of strategic approaches to corporate governance and integrated management systems].

    Science.gov (United States)

    Sens, Brigitte

    2010-01-01

    The concept of general process orientation as an instrument of organisation development is the core principle of quality management philosophy, i.e. the learning organisation. Accordingly, prestigious quality awards and certification systems focus on process configuration and continual improvement. In German health care organisations, particularly in hospitals, this general process orientation has not been widely implemented yet - despite enormous change dynamics and the requirements of both quality and economic efficiency of health care processes. But based on a consistent process architecture that considers key processes as well as management and support processes, the strategy of excellent health service provision including quality, safety and transparency can be realised in daily operative work. The core elements of quality (e.g., evidence-based medicine), patient safety and risk management, environmental management, health and safety at work can be embedded in daily health care processes as an integrated management system (the "all in one system" principle). Sustainable advantages and benefits for patients, staff, and the organisation will result: stable, high-quality, efficient, and indicator-based health care processes. Hospitals with their broad variety of complex health care procedures should now exploit the full potential of total process orientation. Copyright © 2010. Published by Elsevier GmbH.

  3. Apolipoprotein A-I configuration and cell cholesterol efflux activity of discoidal lipoproteins depend on the reconstitution process.

    Science.gov (United States)

    Cuellar, Luz Ángela; Prieto, Eduardo Daniel; Cabaleiro, Laura Virginia; Garda, Horacio Alberto

    2014-01-01

    Discoidal high-density lipoproteins (D-HDL) are critical intermediates in reverse cholesterol transport. Most of the present knowledge of D-HDL is based on studies with reconstituted lipoprotein complexes of apolipoprotein A-I (apoA-I) obtained by cholate dialysis (CD). D-HDL can also be generated by the direct microsolubilization (DM) of phospholipid vesicles at the gel/fluid phase transition temperature, a process mechanistically similar to the "in vivo" apoAI lipidation via ABCA1. We compared the apoA-I configuration in D-HDL reconstituted with dimyristoylphosphatidylcholine by both procedures using fluorescence resonance energy transfer measurements with apoA-I tryptophan mutants and fluorescently labeled cysteine mutants. Results indicate that apoA-I configuration in D-HDL depends on the reconstitution process and are consistent with a "double belt" molecular arrangement with different helix registry. As reported by others, a configuration with juxtaposition of helices 5 of each apoAI monomer (5/5 registry) predominates in D-HDL obtained by CD. However, a configuration with helix 5 of one monomer juxtaposed with helix 2 of the other (5/2 registry) would predominate in D-HDL generated by DM. Moreover, we also show that the kinetics of cholesterol efflux from macrophage cultures depends on the reconstitution process, suggesting that apoAI configuration is important for this HDL function. Copyright © 2013 Elsevier B.V. All rights reserved.

  4. Process management practice

    International Nuclear Information System (INIS)

    Pyeon, In Beom

    1983-04-01

    This book gives descriptions of qualifying subject and test scope like production plan and control, economic feasibility, process management, quality management and operations research, industrial economics like materials and marketing management, production management such as meaning and goals of process management and production plan and control, basic economic concept, official interest and equivalence, and depreciation, and OR concept such as network analysis and PERT CPM and stimulation.

  5. Evaluating the Potential of Commercial GIS for Accelerator Configuration Management

    International Nuclear Information System (INIS)

    Larrieu, T.L.; Roblin, Y.R.; White, K.; Slominski, R.

    2005-01-01

    The Geographic Information System (GIS) is a tool used by industries needing to track information about spatially distributed assets. A water utility, for example, must know not only the precise location of each pipe and pump, but also the respective pressure rating and flow rate of each. In many ways, an accelerator such as CEBAF (Continuous Electron Beam Accelerator Facility) can be viewed as an ''electron utility''. Whereas the water utility uses pipes and pumps, the ''electron utility'' uses magnets and RF cavities. At Jefferson lab we are exploring the possibility of implementing ESRI's ArcGIS as the framework for building an all-encompassing accelerator configuration database that integrates location, configuration, maintenance, and connectivity details of all hardware and software. The possibilities of doing so are intriguing. From the GIS, software such as the model server could always extract the most-up-to-date layout information maintained by the Survey and Alignment for lattice modeling. The Mechanical Engineering department could use ArcGIS tools to generate CAD drawings of machine segments from the same database. Ultimately, the greatest benefit of the GIS implementation could be to liberate operators and engineers from the limitations of the current system-by-system view of machine configuration and allow a more integrated regional approach. The commercial GIS package provides a rich set of tools for database-connectivity, versioning, distributed editing, importing and exporting, and graphical analysis and querying, and therefore obviates the need for much custom development. However, formidable challenges to implementation exist and these challenges are not only technical and manpower issues, but also organizational ones. The GIS approach would crosscut organizational boundaries and require departments, which heretofore have had free reign to manage their own data, to cede some control and agree to a centralized framework

  6. Evaluating the Potential of Commercial GIS for Accelerator Configuration Management

    Energy Technology Data Exchange (ETDEWEB)

    T.L. Larrieu; Y.R. Roblin; K. White; R. Slominski

    2005-10-10

    The Geographic Information System (GIS) is a tool used by industries needing to track information about spatially distributed assets. A water utility, for example, must know not only the precise location of each pipe and pump, but also the respective pressure rating and flow rate of each. In many ways, an accelerator such as CEBAF (Continuous Electron Beam Accelerator Facility) can be viewed as an ''electron utility''. Whereas the water utility uses pipes and pumps, the ''electron utility'' uses magnets and RF cavities. At Jefferson lab we are exploring the possibility of implementing ESRI's ArcGIS as the framework for building an all-encompassing accelerator configuration database that integrates location, configuration, maintenance, and connectivity details of all hardware and software. The possibilities of doing so are intriguing. From the GIS, software such as the model server could always extract the most-up-to-date layout information maintained by the Survey & Alignment for lattice modeling. The Mechanical Engineering department could use ArcGIS tools to generate CAD drawings of machine segments from the same database. Ultimately, the greatest benefit of the GIS implementation could be to liberate operators and engineers from the limitations of the current system-by-system view of machine configuration and allow a more integrated regional approach. The commercial GIS package provides a rich set of tools for database-connectivity, versioning, distributed editing, importing and exporting, and graphical analysis and querying, and therefore obviates the need for much custom development. However, formidable challenges to implementation exist and these challenges are not only technical and manpower issues, but also organizational ones. The GIS approach would crosscut organizational boundaries and require departments, which heretofore have had free reign to manage their own data, to cede some control and agree to a

  7. A Business Process Management System based on a General Optimium Criterion

    Directory of Open Access Journals (Sweden)

    Vasile MAZILESCU

    2009-01-01

    Full Text Available Business Process Management Systems (BPMS provide a broadrange of facilities to manage operational business processes. These systemsshould provide support for the complete Business Process Management (BPMlife-cycle [16]: (redesign, configuration, execution, control, and diagnosis ofprocesses. BPMS can be seen as successors of Workflow Management (WFMsystems. However, already in the seventies people were working on officeautomation systems which are comparable with today’s WFM systems.Recently, WFM vendors started to position their systems as BPMS. Our paper’sgoal is a proposal for a Tasks-to-Workstations Assignment Algorithm (TWAAfor assembly lines which is a special implementation of a stochastic descenttechnique, in the context of BPMS, especially at the control level. Both cases,single and mixed-model, are treated. For a family of product models having thesame generic structure, the mixed-model assignment problem can be formulatedthrough an equivalent single-model problem. A general optimum criterion isconsidered. As the assembly line balancing, this kind of optimisation problemleads to a graph partitioning problem meeting precedence and feasibilityconstraints. The proposed definition for the "neighbourhood" function involvesan efficient way for treating the partition and precedence constraints. Moreover,the Stochastic Descent Technique (SDT allows an implicit treatment of thefeasibility constraint. The proposed algorithm converges with probability 1 toan optimal solution.

  8. Nanoscale multireference quantum chemistry: full configuration interaction on graphical processing units.

    Science.gov (United States)

    Fales, B Scott; Levine, Benjamin G

    2015-10-13

    Methods based on a full configuration interaction (FCI) expansion in an active space of orbitals are widely used for modeling chemical phenomena such as bond breaking, multiply excited states, and conical intersections in small-to-medium-sized molecules, but these phenomena occur in systems of all sizes. To scale such calculations up to the nanoscale, we have developed an implementation of FCI in which electron repulsion integral transformation and several of the more expensive steps in σ vector formation are performed on graphical processing unit (GPU) hardware. When applied to a 1.7 × 1.4 × 1.4 nm silicon nanoparticle (Si72H64) described with the polarized, all-electron 6-31G** basis set, our implementation can solve for the ground state of the 16-active-electron/16-active-orbital CASCI Hamiltonian (more than 100,000,000 configurations) in 39 min on a single NVidia K40 GPU.

  9. Development of an integrated configuration management/flight director system for piloted STOL approaches

    Science.gov (United States)

    Hoh, R. H.; Klein, R. H.; Johnson, W. A.

    1977-01-01

    A system analysis method for the development of an integrated configuration management/flight director system for IFR STOL approaches is presented. Curved descending decelerating approach trajectories are considered. Considerable emphasis is placed on satisfying the pilot centered requirements (acceptable workload) as well as the usual guidance and control requirements (acceptable performance). The Augmentor Wing Jet STOL Research Aircraft was utilized to allow illustration by example, and to validate the analysis procedure via manned simulation.

  10. Automated firewall analytics design, configuration and optimization

    CERN Document Server

    Al-Shaer, Ehab

    2014-01-01

    This book provides a comprehensive and in-depth study of automated firewall policy analysis for designing, configuring and managing distributed firewalls in large-scale enterpriser networks. It presents methodologies, techniques and tools for researchers as well as professionals to understand the challenges and improve the state-of-the-art of managing firewalls systematically in both research and application domains. Chapters explore set-theory, managing firewall configuration globally and consistently, access control list with encryption, and authentication such as IPSec policies. The author

  11. Data from configuration management tools as sources for software process mining

    NARCIS (Netherlands)

    Trienekens, J.J.M.; Kusters, R.J.; Samalik, J.; Weijters, A.J.M.M.; Lavazza, L; Oberhauser, R; Martin, A; Hassine, J; Gebhart, M; Jäntti, M

    2013-01-01

    Process mining has proven to be a valuable approach that provides new and objective insights into processes within organizations. Based on sets of well-structured data, the underlying ‘actual’ processes can be extracted and process models can be constructed automatically, i.e., the process model can

  12. Hanford Tanks Initiative requirements and document management process guide

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This revision of the guide provides updated references to project management level Program Management and Assessment Configuration Management activities, and provides working level directions for submitting requirements and project documentation related to the Hanford Tanks Initiative (HTI) project. This includes documents and information created by HTI, as well as non-HTI generated materials submitted to the project

  13. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  14. Configuration and supervision of advanced distributed data acquisition and processing systems for long pulse experiments using JINI technology

    International Nuclear Information System (INIS)

    Gonzalez, Joaquin; Ruiz, Mariano; Barrera, Eduardo; Lopez, Juan Manuel; de Arcas, Guillermo; Vega, Jesus

    2009-01-01

    The development of tools for managing the capabilities and functionalities of distributed data acquisition systems is essential in long pulse fusion experiments. The intelligent test and measurement system (ITMS) developed by UPM and CIEMAT is a technology that permits implementation of a scalable data acquisition and processing system based on PXI or CompactPCI hardware. Several applications based on JINI technology have been developed to enable use of this platform for extensive implementation of distributed data acquisition and processing systems. JINI provides a framework for developing service-oriented, distributed applications. The applications are based on the paradigm of a JINI federation that supports mechanisms for publication, discovering, subscription, and links to remote services. The model we implemented in the ITMS platform included services in the system CPU (SCPU) and peripheral CPUs (PCPUs). The resulting system demonstrated the following capabilities: (1) setup of the data acquisition and processing to apply to the signals, (2) information about the evolution of the data acquisition, (3) information about the applied data processing and (4) detection and distribution of the events detected by the ITMS software applications. With this approach, software applications running on the ITMS platform can be understood, from the perspective of their implementation details, as a set of dynamic, accessible, and transparent services. The search for services is performed using the publication and subscription mechanisms of the JINI specification. The configuration and supervision applications were developed using remotely accessible (LAN or WAN) objects. The consequence of this approach is a hardware and software architecture that provides a transparent model of remote configuration and supervision, and thereby a means to simplify the implementation of a distributed data acquisition system with scalable and dynamic local processing capability developed in a

  15. Configuration and supervision of advanced distributed data acquisition and processing systems for long pulse experiments using JINI technology

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, Joaquin; Ruiz, Mariano [Grupo de Investigacion en Instrumentacion y Acustica Aplicada, Universidad Politecnica de Madrid (UPM), Ctra. Valencia Km-7, 28031, Madrid (Spain); Barrera, Eduardo [Grupo de Investigacion en Instrumentacion y Acustica Aplicada, Universidad Politecnica de Madrid (UPM), Ctra. Valencia Km-7, 28031, Madrid (Spain)], E-mail: eduardo.barrera@upm.es; Lopez, Juan Manuel; de Arcas, Guillermo [Grupo de Investigacion en Instrumentacion y Acustica Aplicada, Universidad Politecnica de Madrid (UPM), Ctra. Valencia Km-7, 28031, Madrid (Spain); Vega, Jesus [Asociacion EURATOM/CIEMAT para Fusion, Avda. Complutense 22, 28040, Madrid (Spain)

    2009-06-15

    The development of tools for managing the capabilities and functionalities of distributed data acquisition systems is essential in long pulse fusion experiments. The intelligent test and measurement system (ITMS) developed by UPM and CIEMAT is a technology that permits implementation of a scalable data acquisition and processing system based on PXI or CompactPCI hardware. Several applications based on JINI technology have been developed to enable use of this platform for extensive implementation of distributed data acquisition and processing systems. JINI provides a framework for developing service-oriented, distributed applications. The applications are based on the paradigm of a JINI federation that supports mechanisms for publication, discovering, subscription, and links to remote services. The model we implemented in the ITMS platform included services in the system CPU (SCPU) and peripheral CPUs (PCPUs). The resulting system demonstrated the following capabilities: (1) setup of the data acquisition and processing to apply to the signals, (2) information about the evolution of the data acquisition, (3) information about the applied data processing and (4) detection and distribution of the events detected by the ITMS software applications. With this approach, software applications running on the ITMS platform can be understood, from the perspective of their implementation details, as a set of dynamic, accessible, and transparent services. The search for services is performed using the publication and subscription mechanisms of the JINI specification. The configuration and supervision applications were developed using remotely accessible (LAN or WAN) objects. The consequence of this approach is a hardware and software architecture that provides a transparent model of remote configuration and supervision, and thereby a means to simplify the implementation of a distributed data acquisition system with scalable and dynamic local processing capability developed in a

  16. Strategies and criteria for risk-based configuration control

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Vesely, W.E.

    1991-01-01

    A configuration, as used here, is a set of component operability or statuses that define the state of a nuclear power plant. Risk-based configuration control is the management of component configurations using a risk perspective to control risk and assure safety. If the component configurations that have high risk implications do not occur then the risk from the operation of nuclear power plants would be minimal. The control of component configurations, i.e., the management of component statuses, so that the risk from components being unavailable is minimized, becomes difficult because the status of a standby safety system component is often not apparent unless it is tested. In this paper, we discuss the strategies and criteria for risk-based configuration control in nuclear power plants. In developing these strategies and criteria, the primary objective is to obtain more direct risk control but the added benefit is the effective use of plant resources. Implementation of such approaches can result in replacement/modification of parts of Technical Specifications. Specifically, the risk impact or safety impact of a configuration depends upon four factors: (1) The configuration components which are simultaneously down (i.e., inoperable); (2) the backup components which are known to be up (i.e., operable); (3) the duration of time the configuration exists (the outage time); and (4) the frequency at which the configuration occurs. Risk-based configuration control involves managing these factors using risk analyses and risk insights. In this paper, we discuss each of the factors and illustrate how they can be controlled. The information and the tools needed in implementing configuration control are also discussed. The risk-based calculation requirements in achieving the control are also delineated. 4 refs., 4 figs., 1 tab

  17. Utilisation d'analyse de concepts formels pour la gestion de variabilite d'un logiciel configure dynamiquement

    Science.gov (United States)

    Menguy, Theotime

    Because of its critical nature, avionic industry is bound with numerous constraints such as security standards and certifications while having to fulfill the clients' desires for personalization. In this context, variability management is a very important issue for re-engineering projects of avionic softwares. In this thesis, we propose a new approach, based on formal concept analysis and semantic web, to support variability management. The first goal of this research is to identify characteristic behaviors and interactions of configuration variables in a dynamically configured system. To identify such elements, we used formal concept analysis on different levels of abstractions in the system and defined new metrics. Then, we built a classification for the configuration variables and their relations in order to enable a quick identification of a variable's behavior in the system. This classification could help finding a systematic approach to process variables during a re-engineering operation, depending on their category. To have a better understanding of the system, we also studied the shared controls of code between configuration variables. A second objective of this research is to build a knowledge platform to gather the results of all the analysis performed, and to store any additional element relevant in the variability management context, for instance new results helping define re-engineering process for each of the categories. To address this goal, we built a solution based on a semantic web, defining a new ontology, very extensive and enabling to build inferences related to the evolution processes. The approach presented here is, to the best of our knowledge, the first classification of configuration variables of a dynamically configured software and an original use of documentation and variability management techniques using semantic web in the aeronautic field. The analysis performed and the final results show that formal concept analysis is a way to

  18. Environmental restoration project configuration control

    International Nuclear Information System (INIS)

    Hutterman, L.L.

    1991-01-01

    This paper provides an overview of the approach that Westinghouse Idaho Nuclear Company, Inc. (WINCO) is using for the implementation of the configuration control requirements for a major system acquisition under the guidance of US Department of Energy (DOE) Order 4700.1, open-quotes Project Management System,close quotes for environmental restoration. The two major features of the WINCO environmental restoration approach relate to (1) the product and (2) the maintenance of the baseline for many sites in different phases at the same time. Historically, a project has typically produced a product. Environmental restoration in some ways produces no typical project product. Essentially, what is produced and what configuration control management is exercised on is one of the following: (1) the development of clean dirt, (2) the documentation to support clean dirt, or (3) the track record of each of the sites. It is the latter approach that this paper deals with. This approach is unique in that there are four baselines [cost, schedule, scope, and technical (the track record product)] rather than the typical three. This is essential in configuration management due to the lack of a uniquely identifiable product for each site. Essentially, the philosophy behind the four-part configuration controls allows the technical baseline to fulfill the function typically met by the identifiable product

  19. Information Security Monitoring Process Research in Russian Federation Banking System Organization

    Directory of Open Access Journals (Sweden)

    Anton Sergeevich Zaytsev

    2013-09-01

    Full Text Available In this article the author considers documents and scientific articles that should be used to configure monitoring and information security incident management process in an organization of banking system of Russia. Also key principles of monitoring configuration were marked up and a technique of monitoring configuration was proposed. Principles of monitoring system configuration were defined and a set of documents used to legitimate monitoring and information incident management process was considered.

  20. Application of the ETOM framework for defining processes in the telecommunication systems management network of the Serbian Army

    Directory of Open Access Journals (Sweden)

    Vladimir B. Suša

    2013-10-01

    Full Text Available This paper deals with management system requirements in telecommunications. A TMN (Telecommunication Management Network is necessary to be well designed and constantly upgraded. The  ETOM (Enhanced Telecommunication Operation Map framework, defined by the ITU-T Recommendation M.3050, is used to describe various processes that occur in the network for monitoring and control of military telecommunications systems. Their definition is an essential precondition for introducing management applications that would manage all of the processes in their end-to-end structure. Telecommunication networks are categorized in  accordance withg their functions. A set of relevant network processes important for supervision and management is explained for each described subsystem. This defining represents a prerequisite for the management application configuration which aims to automate management functions and services. eTOM frame and its implementation in telecommunication management networks ETOM is defined as a telecommunication conceptual frame which includes all the processes that exist in a telecommunication network. It does not represent a telecommunication model, but gives a basic frame for all the processes to be included within. It ranges throughout three basic areas: operation processes, planning and development processes and production management. ETOM supports two different process grouping perspectives: horizontal and vertical. The aim of this kind of grouping is to provide the complete overview in all the processes a telecommunication management network should include. Horizontal grouping includes functional processes within the same managed system. Vertical grouping includes all the processes within a TMN. Overlapped horizontal and vertical group constellations enable a connected matrix structure of the eTOM frame. Operational processes within a TMN can be divided into a few categories: user-network interaction, services management and

  1. Communications and Information: Strategic Automated Command Control System-Data Transmission Subsystem (SACCS-DTS) Software Configuration Management and Change Control

    National Research Council Canada - National Science Library

    1997-01-01

    .... It prescribes the requirements, responsibilities, and procedures for operation, security, and configuration management of the Strategic Automated Command Control System-Data Transmission Subsystem (SACCS-DTS...

  2. A knowledge-based system for optimization of fuel reload configurations

    International Nuclear Information System (INIS)

    Galperin, A.; Kimhi, S.; Segev, M.

    1989-01-01

    The authors discuss a knowledge-based production system developed for generating optimal fuel reload configurations. The system was based on a heuristic search method and implemented in Common Lisp programming language. The knowledge base embodied the reactor physics, reactor operations, and a general approach to fuel management strategy. The data base included a description of the physical system involved, i.e., the core geometry and fuel storage. The fifth cycle of the Three Mile Island Unit 1 pressurized water reactor was chosen as a test case. Application of the system to the test case revealed a self-learning process by which a relatively large number of near-optimal configurations were discovered. Several selected solutions were subjected to detailed analysis and demonstrated excellent performance. To summarize, applicability of the proposed heuristic search method in the domain of nuclear fuel management was proved unequivocally

  3. Dynamic processes in field-reversed-configuration compact toroids

    International Nuclear Information System (INIS)

    Rej, D.J.

    1987-01-01

    In this lecture, the dynamic processes involved in field-reversed configuration (FRC) formation, translation, and compression will be reviewed. Though the FRC is related to the field-reversed mirror concept, the formation method used in most experiments is a variant of the field-reversed Θ-pinch. Formation of the FRC eqilibrium occurs rapidly, usually in less than 20 μs. The formation sequence consists of several coupled processes: preionization; radial implosion and compression; magnetic field line closure; axial contraction; equilibrium formation. Recent experiments and theory have led to a significantly improved understanding of these processes; however, the experimental method still relies on a somewhat empirical approach which involves the optimization of initial preionization plasma parameters and symmetry. New improvements in FRC formation methods include the use of lower voltages which extrapolate better to larger devices. The axial translation of compact toroid plasmas offers an attractive engineering convenience in a fusion reactor. FRC translation has been demonstrated in several experiments worldwide, and these plasmas are found to be robust, moving at speeds up to the Alfven velocity over distances of up to 16 m, with no degradation in the confinement. Compact toroids are ideal for magnetic compression. Translated FRCs have been compressed and heated by imploding liners. Upcoming experiments will rely on external flux compression to heat a translater FRC at 1-GW power levels. 39 refs

  4. Integration, Configuration and Coordination: from Project to Reality, at CERN

    CERN Document Server

    Barberan Marin, Maria; Bernardini, Marzia; Birtwistle, Thomas; Chemli, Samy; Corso, Jean-Pierre; Coupard, Julie; Foraz, Katy; Grillot, Serge; Muttoni, Yvon; Perrot, Anne-Laure

    2016-01-01

    The rigorous process in place at CERN to approve and follow-up the implementation of any modification of the LHC machine and its Injectors is presented in this paper. Our methodology implies the support of three teams, in charge of the configuration management, the scheduling and safety coordination, and the 3D integration studies. At each stage of the project the support of the three teams evolves, to provide the adequate support in the preparation phase and during the technical stops and long shutdowns. The formal roles and the processes used to govern the interaction of the Integration, Configuration and Coordination teams, and their relation to the project teams during the preparation and implementation phases, for activities to be performed in LHC and its injector chain are described and discussed.

  5. Operational Dynamic Configuration Analysis

    Science.gov (United States)

    Lai, Chok Fung; Zelinski, Shannon

    2010-01-01

    Sectors may combine or split within areas of specialization in response to changing traffic patterns. This method of managing capacity and controller workload could be made more flexible by dynamically modifying sector boundaries. Much work has been done on methods for dynamically creating new sector boundaries [1-5]. Many assessments of dynamic configuration methods assume the current day baseline configuration remains fixed [6-7]. A challenging question is how to select a dynamic configuration baseline to assess potential benefits of proposed dynamic configuration concepts. Bloem used operational sector reconfigurations as a baseline [8]. The main difficulty is that operational reconfiguration data is noisy. Reconfigurations often occur frequently to accommodate staff training or breaks, or to complete a more complicated reconfiguration through a rapid sequence of simpler reconfigurations. Gupta quantified a few aspects of airspace boundary changes from this data [9]. Most of these metrics are unique to sector combining operations and not applicable to more flexible dynamic configuration concepts. To better understand what sort of reconfigurations are acceptable or beneficial, more configuration change metrics should be developed and their distribution in current practice should be computed. This paper proposes a method to select a simple sequence of configurations among operational configurations to serve as a dynamic configuration baseline for future dynamic configuration concept assessments. New configuration change metrics are applied to the operational data to establish current day thresholds for these metrics. These thresholds are then corroborated, refined, or dismissed based on airspace practitioner feedback. The dynamic configuration baseline selection method uses a k-means clustering algorithm to select the sequence of configurations and trigger times from a given day of operational sector combination data. The clustering algorithm selects a simplified

  6. Conceptual Modelling for Product Configuration Systems

    DEFF Research Database (Denmark)

    Shafiee, Sara

    Individual customization of goods and processes in different industries leads to complexity due to a growing mix of products both regarding characteristics of products and support services. In order to eliminate complexity and challenges in product/process customizing, smart IT systems called...... Product Configuration Systems (PCS), have been proposed as the solution both by researchers and practitioners and various benefits are mentioned from utilizing PCSs. Based on the latest literature, there are challenges reported in all phases of PCS projects including planning, development......, and documentation. Moreover, the challenges become more serious when it involves complicated products/processes in engineer-to-order (ETO) companies. The purpose of this thesis is to contribute to the existing knowledge of managing PCS projects by proposing frameworks and tools to address some of the main...

  7. CONFIGURATION GENERATOR MODEL

    International Nuclear Information System (INIS)

    Alsaed, A.

    2004-01-01

    ''The Disposal Criticality Analysis Methodology Topical Report'' prescribes an approach to the methodology for performing postclosure criticality analyses within the monitored geologic repository at Yucca Mountain, Nevada. An essential component of the methodology is the ''Configuration Generator Model for In-Package Criticality'' that provides a tool to evaluate the probabilities of degraded configurations achieving a critical state. The configuration generator model is a risk-informed, performance-based process for evaluating the criticality potential of degraded configurations in the monitored geologic repository. The method uses event tree methods to define configuration classes derived from criticality scenarios and to identify configuration class characteristics (parameters, ranges, etc.). The probabilities of achieving the various configuration classes are derived in part from probability density functions for degradation parameters. The NRC has issued ''Safety Evaluation Report for Disposal Criticality Analysis Methodology Topical Report, Revision 0''. That report contained 28 open items that required resolution through additional documentation. Of the 28 open items, numbers 5, 6, 9, 10, 18, and 19 were concerned with a previously proposed software approach to the configuration generator methodology and, in particular, the k eff regression analysis associated with the methodology. However, the use of a k eff regression analysis is not part of the current configuration generator methodology and, thus, the referenced open items are no longer considered applicable and will not be further addressed

  8. Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

    Science.gov (United States)

    Mckay, Charles

    1991-01-01

    This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

  9. An Approach for Implementation of Project Management Information Systems

    Science.gov (United States)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  10. A user configurable data acquisition and signal processing system for high-rate, high channel count applications

    International Nuclear Information System (INIS)

    Salim, Arwa; Crockett, Louise; McLean, John; Milne, Peter

    2012-01-01

    Highlights: ► The development of a new digital signal processing platform is described. ► The system will allow users to configure the real-time signal processing through software routines. ► The architecture of the DRUID system and signal processing elements is described. ► A prototype of the DRUID system has been developed for the digital chopper-integrator. ► The results of acquisition on 96 channels at 500 kSamples/s per channel are presented. - Abstract: Real-time signal processing in plasma fusion experiments is required for control and for data reduction as plasma pulse times grow longer. The development time and cost for these high-rate, multichannel signal processing systems can be significant. This paper proposes a new digital signal processing (DSP) platform for the data acquisition system that will allow users to easily customize real-time signal processing systems to meet their individual requirements. The D-TACQ reconfigurable user in-line DSP (DRUID) system carries out the signal processing tasks in hardware co-processors (CPs) implemented in an FPGA, with an embedded microprocessor (μP) for control. In the fully developed platform, users will be able to choose co-processors from a library and configure programmable parameters through the μP to meet their requirements. The DRUID system is implemented on a Spartan 6 FPGA, on the new rear transition module (RTM-T), a field upgrade to existing D-TACQ digitizers. As proof of concept, a multiply-accumulate (MAC) co-processor has been developed, which can be configured as a digital chopper-integrator for long pulse magnetic fusion devices. The DRUID platform allows users to set options for the integrator, such as the number of masking samples. Results from the digital integrator are presented for a data acquisition system with 96 channels simultaneously acquiring data at 500 kSamples/s per channel.

  11. Configuration Management Fundamentals

    National Research Council Canada - National Science Library

    2005-01-01

    The U.S. Air Force's Software Technology Support Center offers an updated and condensed version of the "Guidelines for Successful Acquisition and Management of Software-Intensive Systems" (GSAM) on its Web site...

  12. Tolerance to spatial-relational transformations in unfamiliar faces: A further challenge to a configural processing account of identity recognition.

    Science.gov (United States)

    Lorenzino, Martina; Caminati, Martina; Caudek, Corrado

    2018-05-25

    One of the most important questions in face perception research is to understand what information is extracted from a face in order to recognize its identity. Recognition of facial identity has been attributed to a special sensitivity to "configural" information. However, recent studies have challenged the configural account by showing that participants are poor in discriminating variations of metric distances among facial features, especially for familiar as opposed to unfamiliar faces, whereas a configural account predicts the opposite. We aimed to extend these previous results by examining classes of unfamiliar faces with which we have different levels of expertise. We hypothesized an inverse relation between sensitivity to configural information and expertise with a given class of faces, but only for neutral expressions. By first matching perceptual discriminability, we measured tolerance to subtle configural transformations with same-race (SR) versus other-race (OR) faces, and with upright versus upside-down faces. Consistently with our predictions, we found a lower sensitivity to at-threshold configural changes for SR compared to OR faces. We also found that, for our stimuli, the face inversion effect disappeared for neutral but not for emotional faces - a result that can also be attributed to a lower sensitivity to configural transformations for faces presented in a more familiar orientation. The present findings question a purely configural account of face processing and suggest that the role of spatial-relational information in face processing varies according to the functional demands of the task and to the characteristics of the stimuli. Copyright © 2018 Elsevier B.V. All rights reserved.

  13. Profiling event logs to configure risk indicators for process delays

    NARCIS (Netherlands)

    Pika, A.; Aalst, van der W.M.P.; Fidge, C.J.; Hofstede, ter A.H.M.; Wynn, M.T.; Salinesi, C.; Norrie, M.C.; Pastor, O.

    2013-01-01

    Risk identification is one of the most challenging stages in the risk management process. Conventional risk management approaches provide little guidance and companies often rely on the knowledge of experts for risk identification. In this paper we demonstrate how risk indicators can be used to

  14. Survey on the use of configuration risk and safety management tools at nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Fleming, K.N.; Read, J.W.; Dagan, W.J.; Bidwell, D.A.

    1998-09-01

    In order to provide input to Electricite de France's (EDF) evaluation of the use of configuration safety and risk management tools in the French plants and to collect information to guide the EPRI efforts to provide useful tools for the EPRI member utilities and international partners, a joint effort to survey US and selected non-US nuclear power stations was conducted. This survey examined the use of various approaches, techniques, and software tools that are being used to evaluate the safety and risk aspects of plant configuration changes and configuration changes during plant outages as well as during power operation. The use of these tools has increased in recent years as a result of efforts to optimize plant maintenance programs, improve plant safety, and increase plant reliability and availability. This report provides the results of the survey of 37 organizations covering 54 nuclear plant sites and 97 reactor units

  15. Configuring a Graphical User Interface for Managing Local HYSPLIT Model Runs Through AWIPS

    Science.gov (United States)

    Wheeler, mark M.; Blottman, Peter F.; Sharp, David W.; Hoeth, Brian; VanSpeybroeck, Kurt M.

    2009-01-01

    Responding to incidents involving the release of harmful airborne pollutants is a continual challenge for Weather Forecast Offices in the National Weather Service. When such incidents occur, current protocol recommends forecaster-initiated requests of NOAA's Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model output through the National Centers of Environmental Prediction to obtain critical dispersion guidance. Individual requests are submitted manually through a secured web site, with desired multiple requests submitted in sequence, for the purpose of obtaining useful trajectory and concentration forecasts associated with the significant release of harmful chemical gases, radiation, wildfire smoke, etc., into local the atmosphere. To help manage the local HYSPLIT for both routine and emergency use, a graphical user interface was designed for operational efficiency. The interface allows forecasters to quickly determine the current HYSPLIT configuration for the list of predefined sites (e.g., fixed sites and floating sites), and to make any necessary adjustments to key parameters such as Input Model. Number of Forecast Hours, etc. When using the interface, forecasters will obtain desired output more confidently and without the danger of corrupting essential configuration files.

  16. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    International Nuclear Information System (INIS)

    Dobson, Darwin; Churby, Al; Krieger, Ed; Maloy, Donna; White, Kevin

    2012-01-01

    Highlights: ► NIF is a complex experimental facility composed of ∼4 million components. ► We describe business tools to define, build, operate, and maintain all components. ► CAD tools generate virtual models and assemblies under configuration control. ► Items requiring preventive, reactive, and/or calibration maintenance are tracked. ► Radiological or hazardous materials undergo additional controls. - Abstract: The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of experimental data and the safe operation of the facility. A major programmatic challenge is to deploy software solutions to effectively manage the definition, build, operation, and maintenance, and configuration control of all components of NIF. The strategy for meeting this challenge involves deploying and integrating an enterprise application suite of solutions consisting of both Commercial-Off-The-Shelf (COTS) products and custom developed software.This paper describes how this strategy has been implemented along with a discussion on the successes realized and the ongoing challenges associated with this approach.

  17. The Network Configuration of an Object Relational Database Management System

    Science.gov (United States)

    Diaz, Philip; Harris, W. C.

    2000-01-01

    The networking and implementation of the Oracle Database Management System (ODBMS) requires developers to have knowledge of the UNIX operating system as well as all the features of the Oracle Server. The server is an object relational database management system (DBMS). By using distributed processing, processes are split up between the database server and client application programs. The DBMS handles all the responsibilities of the server. The workstations running the database application concentrate on the interpretation and display of data.

  18. Self-Configuration and Self-Optimization Process in Heterogeneous Wireless Networks

    Directory of Open Access Journals (Sweden)

    Eduardo Camponogara

    2010-12-01

    Full Text Available Self-organization in Wireless Mesh Networks (WMN is an emergent research area, which is becoming important due to the increasing number of nodes in a network. Consequently, the manual configuration of nodes is either impossible or highly costly. So it is desirable for the nodes to be able to configure themselves. In this paper, we propose an alternative architecture for self-organization of WMN based on Optimized Link State Routing Protocol (OLSR and the ad hoc on demand distance vector (AODV routing protocols as well as using the technology of software agents. We argue that the proposed self-optimization and self-configuration modules increase the throughput of network, reduces delay transmission and network load, decreases the traffic of HELLO messages according to network’s scalability. By simulation analysis, we conclude that the self-optimization and self-configuration mechanisms can significantly improve the performance of OLSR and AODV protocols in comparison to the baseline protocols analyzed.

  19. Self-Configuration and Self-Optimization Process in Heterogeneous Wireless Networks

    Science.gov (United States)

    Guardalben, Lucas; Villalba, Luis Javier García; Buiati, Fábio; Sobral, João Bosco Mangueira; Camponogara, Eduardo

    2011-01-01

    Self-organization in Wireless Mesh Networks (WMN) is an emergent research area, which is becoming important due to the increasing number of nodes in a network. Consequently, the manual configuration of nodes is either impossible or highly costly. So it is desirable for the nodes to be able to configure themselves. In this paper, we propose an alternative architecture for self-organization of WMN based on Optimized Link State Routing Protocol (OLSR) and the ad hoc on demand distance vector (AODV) routing protocols as well as using the technology of software agents. We argue that the proposed self-optimization and self-configuration modules increase the throughput of network, reduces delay transmission and network load, decreases the traffic of HELLO messages according to network’s scalability. By simulation analysis, we conclude that the self-optimization and self-configuration mechanisms can significantly improve the performance of OLSR and AODV protocols in comparison to the baseline protocols analyzed. PMID:22346584

  20. Business process configuration in the cloud: how to support and analyze multi-tenant processes?

    NARCIS (Netherlands)

    Aalst, van der W.M.P.; Zavattaro, G.; Schreier, U.; Pautasso, C.

    2011-01-01

    Lion's share of cloud research has been focusing on performance related problems. However, cloud computing will also change the way in which business processes are managed and supported, e.g., more and more organizations will be sharing common processes. In the classical setting, where product

  1. AZ-101 Mixer Pump Demonstration Data Acquisition System and Gamma Cart Data Acquisition Control System Software Configuration Management Plan

    International Nuclear Information System (INIS)

    WHITE, D.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the AZ1101 Mixer Pump Demonstration Data Acquisition System (DAS) and the Sludge Mobilization Cart (Gamma Cart) Data Acquisition and Control System (DACS)

  2. Configuration Database for BaBar On-line

    International Nuclear Information System (INIS)

    Salnikov, Andrei

    2003-01-01

    The configuration database is one of the vital systems in the BaBar on-line system. It provides services for the different parts of the data acquisition system and control system, which require run-time parameters. The original design and implementation of the configuration database played a significant role in the successful BaBar operations since the beginning of experiment. Recent additions to the design of the configuration database provide better means for the management of data and add new tools to simplify main configuration tasks. We describe the design of the configuration database, its implementation with the Objectivity/DB object-oriented database, and our experience collected during the years of operation

  3. Knowledge management vs business process management in contemporary enterprises

    Directory of Open Access Journals (Sweden)

    Bitkowska Agnieszka

    2016-06-01

    Full Text Available The main objective of this paper is to identify the system of knowledge management in contemporary process organizations in business process perspective, especially with regard to technological and social conditions. Methodology is based on literature analysis and case studies. The integration of knowledge management technologies, concepts and methods into organizational business processes is challenging research issue today. The concepts of knowledge management and business process management should be analyzed jointly in the contemporary enterprises. Despite of the growing interest among researchers and practitioners of the concept of the knowledge management referring to business process management there is a lack of articles in this area. Appropriate approach to the modelling of knowledge management processes, as well as the use of IT tools, and a motivation system are of key importance for the introduction of this solution in organizations.

  4. Management oriented process

    International Nuclear Information System (INIS)

    2004-01-01

    ANAV decided to implement process-oriented management by adopting the U. S. NEI (Nuclear Electric Industry) model. The article describes the initial phases of the project, its current status and future prospects. The project has been considered as an improvement in the areas of organization and human factors. Recently, IAEA standard drafts are including processes as an accepted management model. (Author)

  5. Application of Configurators in Networks

    DEFF Research Database (Denmark)

    Malis, Martin; Hvam, Lars

    2003-01-01

    Shorter lead-time, improved quality of product specifications and better communication with customers and suppliers are benefits derived from the application of configurators. Configurators are knowledge-based IT-systems that can be applied to deal with product knowledge and to support different...... processes in a company. Traditionally, configurators have been used as an internal tool. In this paper focus will be on the application of configurators in a network of companies, and a procedure for developing product configurators in a network of companies will be presented. The aim is to present...... a structured guideline, tools and methods on how to successfully develop configurators in a network perspective. Findings presented in this paper are supported by research in a case company. The results from the empirical work show a huge potential for the application of configurators in networks of companies....

  6. Managing performance through business processes from BPM to the practice of process management

    CERN Document Server

    Thiault, Dominique

    2012-01-01

    Centred on the performance of the company, this book is a practical guide that organises Business Process Management (BPM) around these major subjects, such as process management, process governance, or the setting up a successful process approach in the company. Each of these subjects is introduced didactically, alternating examples and in-depth information. Relying on implementation recommendations, practical sheets, and illustrations, managing performance through processes can be used, first, to increase the chances that the objectives will be reached and to improve company performance (industrial organisation, service organisation, private or public sector) and to offer methods, rules, models, and practical supports that can easily be reused. The result of a combination of several experiences in the field and of rewarding encounters with managers, experts, and high-level executives, this book durably places the processes in their managerial dimension. It also presents an opening to a systematic approach t...

  7. Business process management and IT management: The missing integration

    DEFF Research Database (Denmark)

    Rahimi, Fatemeh; Møller, Charles; Hvam, Lars

    2016-01-01

    of IT on process innovations, the association between business process management and IT management is under-explored. Drawing on a literature analysis of the capabilities of business process and IT governance frameworks and findings from a case study, we propose the need for horizontal integration between the two......The importance of business processes and the centrality of IT to contemporary organizations' performance calls for a specific focus on business process management and IT management. Despite the wide scope of business process management covering both business and IT domains, and the profound impact...... management functions to enable strategic and operational business - IT alignment. We further argue that the role of IT in an organization influences the direction of integration between the two functions and thus the choice of integration mechanisms. Using case study findings, we propose...

  8. Wireless online position monitoring of manual valve types for plant configuration management in nuclear power plants

    International Nuclear Information System (INIS)

    Agarwal, Vivek; Buttles, John W.; Beaty, Lawrence H.; Naser, Joseph; Hallbert, Bruce P.

    2016-01-01

    In the current competitive energy market, the nuclear industry is committed to lower the operations and maintenance cost; increase productivity and efficiency while maintaining safe and reliable operation. The present operating model of nuclear power plants is dependent on large technical staffs that put the nuclear industry at long-term economic disadvantage. Technology can play a key role in nuclear power plant configuration management in offsetting labor costs by automating manually performed plant activities. The technology being developed, tested, and demonstrated in this paper will enable the continued safe operation of today’s fleet of light water reactors by providing the technical means to monitor components in plants today that are only routinely monitored through manual activities. The wireless enabled valve position indicators that are the subject of this paper are able to provide a valid position indication available continuously, rather than only periodically. As a result, a real-time (online) availability of valve positions using an affordable technologies are vital to plant configuration when compared with long-term labor rates, and provide information that can be used for a variety of plant engineering, maintenance, and management applications.

  9. Automated allocation and configuration of dual stack IP networks

    OpenAIRE

    Daniels, Wilfried; Vanbrabant, Bart; Hughes, Danny; Joosen, Wouter

    2013-01-01

    The manual configuration and management of a modern network infrastructure is an increasingly complex task. This complexity is caused by factors including heterogeneity, a high degree of change and dependencies between configuration parameters. Due to increasing complexity, manual configuration has become time consuming and error prone. This paper proposes an automatic configuration tool for dual stack IP networks that addresses these issues by using high level abstractions to model the netwo...

  10. Configurations of Leadership Practices in Hospital Units

    DEFF Research Database (Denmark)

    Meier, Ninna

    2015-01-01

    configurations of leadership practices varied in four different clinical settings, thus contributing with contextual accounts of leadership as practice, and suggested “configurations of practice” as a way to carve out similarities and differences in leadership practices across settings....... and interviews with ten interdisciplinary clinical managers. Findings: – Comparing leadership as configurations of practices across four different clinical settings, the author shows how flexible and often shared leadership practices were embedded in and central to the core clinical work in all units studied...

  11. Software Configuration Management For Multiple Releases: Influence On Development Effort

    Directory of Open Access Journals (Sweden)

    Sławomir P. Maludziński

    2007-01-01

    Full Text Available Software Configuration Management (SCM evolves together with the discipline of softwareengineering. Teams working on software products become larger and are geographically distributedat multiple sites. Collaboration between such groups requires well evaluated SCMplans and strategies to easy cooperation and decrease software development cost by reducingtime spent on SCM activities – branching and merging, that is effort utilized on creation ofrevisions (’serial’ versions and variants (’parallel’ versions. This paper suggests that SCMpractices should be combined with modular design and code refactoring to reduce cost relatedto maintenance of the same code line. Teams which produce several variants of thesame code line at the same time should use approaches like components, modularization, orplug-ins over code alternations maintained on version branches. Findings described in thispaper were taken by teams in charge of development of radio communication systems inMotorola GEMS divisions. Each team collaborating on similar projects used different SCMstrategies to develop parts of this system.

  12. Purification of Contaminated MIL-PRF-83282 Hydraulic Fluid Using the Pall Purifier and Multiple Process Configurations (Preprint)

    National Research Council Canada - National Science Library

    Snyder, Jr., Carl E; Gschwender, Lois J; Gunderson, Stephen L; Fultz, George W

    2006-01-01

    .... This report describes a project that evaluated the effectiveness of various hydraulic fluid purification process configurations on the removal of water and particulate contaminants from MIL-PRF-83282...

  13. Improving network management with Software Defined Networking

    International Nuclear Information System (INIS)

    Dzhunev, Pavel

    2013-01-01

    Software-defined networking (SDN) is developed as an alternative to closed networks in centers for data processing by providing a means to separate the control layer data layer switches, and routers. SDN introduces new possibilities for network management and configuration methods. In this article, we identify problems with the current state-of-the-art network configuration and management mechanisms and introduce mechanisms to improve various aspects of network management

  14. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  15. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  16. Virtual Private Lan Services Over IP/MPLS Networks and Router Configurations

    Directory of Open Access Journals (Sweden)

    Pınar KIRCI

    2015-06-01

    Full Text Available The rising number of users and ever growing traffic rates over the networks reveal the need of higher bandwidth and transmission rates. At every packet transmission process, routers need to route the packets by looking at the routing tables, this fact leads to an increase at the load of the routers and at the amount of time consumed during the processes. Today, users need high level security, faster data transmission and easy managed network structures because of the increasing technology usage. MPLS network structures can provide these requirements with their QoS feature. In our work, at first a topology structure is constructed with the routers that are used in Alcatel-Lucent laboratories. OSPF (Open Shortest Path First routing protocol and MPLS (Multiprotocol Label Switching technologies are used over the topology. Afterwards, E-pipe (Ethernet Pipe and VPLS (Virtual private LAN services configurations are performed over the routers. To illustrate the current network data traffic, three tests are performed in the study. Routers’ configurations are performed by Secure-CRT and still developing i-Gen software. With i-Gen, many routers’ configurations can be performed with a user friendly interface. Instead of performing the configurations one by one with Secure CRT, the user can perform the routers’ configurations easily by entering the needed values for the system with i-Gen software. So, with the new and developing i-Gen software, the users’ workload is minimized and streamlined. In our work, Secure-CRT software which is mostly preferred for router configurations at Windows operating system and i-Gen software which is developed by Alcatel-Lucent are considered. Both of the router configuration softwares are worked on and gained results are expounded. Consequently, instead of using time consuming Secure-CRT software, with utilizing new developed i-Gen software, the users’ work load is minimized.

  17. Runtime accelerator configuration tools at Jefferson Laboratory

    International Nuclear Information System (INIS)

    Tiefenback, M.G.; Doolittle, L.; Benesch, J.F.

    1997-01-01

    RF and magnet system configuration and monitoring tools are being implemented at Jefferson Lab to improve system reliability and reduce operating costs. They are prototype components of the Momentum Management System being developed. The RF is of special interest because it affects the momentum and momentum spread of the beam, and because of the immediate financial benefit of managing the klystron DC supply power. The authors describe present and planned monitoring of accelerating system parameters, use of these data, RF system performance calculations, and procedures for magnet configuration for handling beam of any of five beam energies to any of three targets

  18. Maintenance risk management in Dayabay nuclear power plant

    International Nuclear Information System (INIS)

    He Xuhong; Tong Jiejuan

    2005-01-01

    The importance of proper maintenance to safe and reliable nuclear plant operation has long been recognized by the nuclear utility and regulatory body. This paper presents a process of maintenance risk management developed for a Chinese Nuclear Power Plant (NPP). The process includes three phases: (I) long term maintenance plan risk management, (II) monthly maintenance plan risk management, and (III) detailed risk management for high risk configuration. A risk matrix is developed for phase I whose purpose is to provide a rough guide for risk management in the making of the annual maintenance plan. For Phase II and Phase III, a software tool named Maintenance- Risk-Monitor is developed based on the internal initiating event, level 1 PSA model. The results of Phase II are the risk information of the all plant configurations caused by the unavailability of the components included the monthly maintenance plan. When the increase of core damage frequency (CDF) or the incremental core damage probability (ICDP) of a configuration is higher than the corresponding thresholds, Phase III is needed for this high risk configuration to get the useful information such as risk-importance components, human actions and initial events, from which appropriate preventive measurements could be derived. It is hoped that the provided process of maintenance risk management, together with the developed software tool, could facilitate the maintenance activities in the NPPs of China. (authors)

  19. Fundamentals of business process management

    NARCIS (Netherlands)

    Dumas, Marlon; La Rosa, Marcello; Mendling, Jan; Reijers, Hajo A.

    2018-01-01

    This textbook covers the entire Business Process Management (BPM) lifecycle, from process identification to process monitoring, covering along the way process modelling, analysis, redesign and automation. Concepts, methods and tools from business management, computer science and industrial

  20. Dynamic configuration management of a multi-standard and multi-mode reconfigurable multi-ASIP architecture for turbo decoding

    Science.gov (United States)

    Lapotre, Vianney; Gogniat, Guy; Baghdadi, Amer; Diguet, Jean-Philippe

    2017-12-01

    The multiplication of connected devices goes along with a large variety of applications and traffic types needing diverse requirements. Accompanying this connectivity evolution, the last years have seen considerable evolutions of wireless communication standards in the domain of mobile telephone networks, local/wide wireless area networks, and Digital Video Broadcasting (DVB). In this context, intensive research has been conducted to provide flexible turbo decoder targeting high throughput, multi-mode, multi-standard, and power consumption efficiency. However, flexible turbo decoder implementations have not often considered dynamic reconfiguration issues in this context that requires high speed configuration switching. Starting from this assessment, this paper proposes the first solution that allows frame-by-frame run-time configuration management of a multi-processor turbo decoder without compromising the decoding performances.

  1. Study of operational risk-based configuration control

    Energy Technology Data Exchange (ETDEWEB)

    Vesely, W E [Science Applications International Corp., Dublin, OH (United States); Samanta, P K; Kim, I S [Brookhaven National Lab., Upton, NY (United States)

    1991-08-01

    This report studies aspects of a risk-based configuration control system to detect and control plant configurations from a risk perspective. Configuration control, as the term is used here, is the management of component configurations to achieve specific objectives. One important objective is to control risk and safety. Another is to operate efficiently and make effective use of available resources. PSA-based evaluations are performed to study configuration to core-melt frequency and core-melt probability for two plants. Some equipment configurations can cause large core-melt frequency and there are a number of such configurations that are not currently controlled by technical specifications. However, the expected frequency of occurrence of the impacting configurations is small and the core-melt probability contributions are also generally small. The insights from this evaluation are used to develop the framework for an effective risk-based configuration control system. The focal points of such a system and the requirements for tools development for implementing the system are defined. The requirements of risk models needed for the system, and the uses of plant-specific data are also discussed. 18 refs., 25 figs., 10 tabs.

  2. Multi level configuration of ETO products

    DEFF Research Database (Denmark)

    Petersen, Thomas Ditlev; Jørgensen, Kaj Asbjørn; Hvolby, Hans-Henrik

    2007-01-01

    The paper introduces and defines central concepts related to multi level configuration and analyzes which challenges an engineer to order company must deal with to be able to realize a multi level configuration system. It is argued that high flexibility can be achieved and focus can be directed...... in certain business processes if a multi level configuration system is realized....

  3. Project B610 process control configuration acceptance test report

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1995-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: (1) proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; (2) proper operation of all display data on the operators' console; (3) proper operation of all required alarms; and (4) proper operation of all required interlocks. This test only verifies the proper operation of the Westinghouse control configuration (or program). It will not be responsible for verifying proper operation of the MICON hardware or operating software. Neither does it test any of the B610 instrument. The MICON hardware and software has been tested as part of the equipment procurement. Instrumentation and wiring installed under project B620 will be tested under a separate functional test. In some cases, precise transmitter ranges, alarm setpoints, and controller tuning parameters are not available at this time. Therefore, approximate values are used during the test. This should not affect the proper operation of the configuration or the validity of this test. Final values will be assigned during operability testing

  4. Complexity of Configurators Relative to Integrations and Field of Application

    DEFF Research Database (Denmark)

    Kristjansdottir, Katrin; Shafiee, Sara; Battistello, Loris

    . Moreover, configurators are commonly integrated to various IT systems within companies. The complexity of configurators is an important factor when it comes to performance, development and maintenance of the systems. A direct comparison of the complexity based on the different application...... integrations to other IT systems. The research method adopted in the paper is based on a survey followed with interviews where the unit of analysis is based on operating configurators within a company.......Configurators are applied widely to automate the specification processes at companies. The literature describes the industrial application of configurators supporting both sales and engineering processes, where configurators supporting the engineering processes are described more challenging...

  5. Business process management: a survey

    NARCIS (Netherlands)

    Aalst, van der W.M.P.; Hofstede, ter A.H.M.; Weske, M.H.; Aalst, van der W.M.P.; Hofstede, ter A.H.M.; Weske, M.H.

    2003-01-01

    Business Process Management (BPM) includes methods, techniques, and tools to support the design, enactment, management, and analysis of operational business processes. It can be considered as an extension of classical Workflow Management (WFM) systems and approaches. Although the practical relevance

  6. BUSINESS PROCESS REENGINEERING AS THE METHOD OF PROCESS MANAGEMENT

    Directory of Open Access Journals (Sweden)

    O. Honcharova

    2013-09-01

    Full Text Available The article is devoted to the analysis of process management approach. The main understanding of process management approach has been researched in the article. The definition of process and process management has been given. Also the methods of business process improvement has been analyzed, among them are fast-analysis solution technology (FAST, benchmarking, reprojecting and reengineering. The main results of using business process improvement have been described in figures of reducing cycle time, costs and errors. Also the tasks of business process reengineering have been noticed. The main stages of business process reengineering have been noticed. The main efficiency results of business process reengineering and its success factors have been determined.

  7. Improvements to information management systems simulator

    Science.gov (United States)

    Bilek, R. W.

    1972-01-01

    The performance of personnel in the augmentation and improvement of the interactive IMSIM information management simulation model is summarized. With this augmented model, NASA now has even greater capabilities for the simulation of computer system configurations, data processing loads imposed on these configurations, and executive software to control system operations. Through these simulations, NASA has an extremely cost effective capability for the design and analysis of computer-based data management systems.

  8. Demand-side management process evaluations - the management perspective

    International Nuclear Information System (INIS)

    Perrault, G.A.; Barrett, L.B.

    1993-01-01

    A demand-side management (DSM) process evaluation is a qualitative, expert assessment of how a utility marketing program is being conducted. It reviews the efficiency and effectiveness in which a utility plans, manages, executes, and monitors the delivery of DSM programs to its marketplace. Process evaluations,which includes load impact, customer satisfaction and cost-effectiveness analysis, are becoming an increasingly significant component. The process evaluation focus is on the program planning and delivery process as opposed to the energy impacts resulting from the specific measures or products of the program. Because of this process-oriented focus, such evaluations can identify important opportunities for improving the cost-effectiveness of a program without significantly changing product lines. The evaluation may identify administrative or delivery process improvements. In addition, the evaluation may identify ways of improving the degree to which the customer is satisfied with the program or the utility. Since process evaluations are usually conducted as part of a utility's mandated DSM measurement and evaluation plan, they tend to focus mainly on the stated needs of the regulator as opposed to company management. This can be a problem. Although the regulatory perspective is important, in an increasingly competitive business environment, utilities must not overlook management's business and operational needs for specific information regarding DSM program planning, control, execution, and evaluation. This paper discusses some of the conflicts that exist between the regulator's and management's needs for DSM program evaluation results and presents some approaches for assuring that both needs are met. It is organized to first discuss the scope of a process evaluation, then the evaluation issues, the management concerns, and finally reporting of results

  9. Development of advanced spent fuel management process. System analysis of advanced spent fuel management process

    International Nuclear Information System (INIS)

    Ro, S.G.; Kang, D.S.; Seo, C.S.; Lee, H.H.; Shin, Y.J.; Park, S.W.

    1999-03-01

    The system analysis of an advanced spent fuel management process to establish a non-proliferation model for the long-term spent fuel management is performed by comparing the several dry processes, such as a salt transport process, a lithium process, the IFR process developed in America, and DDP developed in Russia. In our system analysis, the non-proliferation concept is focused on the separation factor between uranium and plutonium and decontamination factors of products in each process, and the non-proliferation model for the long-term spent fuel management has finally been introduced. (Author). 29 refs., 17 tabs., 12 figs

  10. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  11. 106-17 Telemetry Management Resources Chapter 25

    Science.gov (United States)

    2017-07-01

    shall not be persistent except where specifically designated. Resources designated as persistent shall have their value stored in non-volatile memory ... false ”. To cancel the configuration process, a TmNSApp manager may execute either a TMA reset or a TmNSHost reset. 3. Upon receipt of the...tmnsTmaCommon:tmnsTmaCommonConfiguration:configure resource to “ false ”. e. Send a configurationCompleteNotification via the

  12. 23 CFR 450.320 - Congestion management process in transportation management areas.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Congestion management process in transportation... Programming § 450.320 Congestion management process in transportation management areas. (a) The transportation planning process in a TMA shall address congestion management through a process that provides for safe and...

  13. IP Address Management Principles and Practice

    CERN Document Server

    Rooney, Timothy

    2010-01-01

    This book will be the first covering the subject of IP address management (IPAM). The practice of IPAM includes the application of network management disciplines to IP address space and associated network services, namely DHCP (Dynamic Host Configuration Protocol) and DNS (Domain Name System). The consequence of inaccurately configuring DHCP is that end users may not be able to obtain IP addresses to access the network. Without proper DNS configuration, usability of the network will greatly suffer as the name-to-address lookup process may fail. Imagine having to navigate to a website or send a

  14. KNOWLEDGE MANAGEMENT PROCESSES AND INTELLECTUAL PROPERTY MANAGEMENT PROCESSES: AN INTEGRATED CONCEPTUAL FRAMEWORK

    OpenAIRE

    HENAO-CALAD, MONICA; RIVERA-MONTOYA, PAULA; URIBE-OCHOA, BEATRIZ

    2017-01-01

    ABSTRACT Intellectual property management, knowledge management are disciplines that have been treated independently, both in academia and in the organizational field. Through the legal discipline of intellectual property, the former manages intangible assets that are eligible for protection (copyright, patents and trademarks, among others) leaving aside those assets that cannot be realized in any way. The latter is devoted to the processes of knowledge management in general, namely, the know...

  15. Electronic Handbooks Simplify Process Management

    Science.gov (United States)

    2012-01-01

    Getting a multitude of people to work together to manage processes across many organizations for example, flight projects, research, technologies, or data centers and others is not an easy task. Just ask Dr. Barry E. Jacobs, a research computer scientist at Goddard Space Flight Center. He helped NASA develop a process management solution that provided documenting tools for process developers and participants to help them quickly learn, adapt, test, and teach their views. Some of these tools included editable files for subprocess descriptions, document descriptions, role guidelines, manager worksheets, and references. First utilized for NASA's Headquarters Directives Management process, the approach led to the invention of a concept called the Electronic Handbook (EHB). This EHB concept was successfully applied to NASA's Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs, among other NASA programs. Several Federal agencies showed interest in the concept, so Jacobs and his team visited these agencies to show them how their specific processes could be managed by the methodology, as well as to create mockup versions of the EHBs.

  16. Dissociated neural processing for decisions in managers and non-managers.

    Science.gov (United States)

    Caspers, Svenja; Heim, Stefan; Lucas, Marc G; Stephan, Egon; Fischer, Lorenz; Amunts, Katrin; Zilles, Karl

    2012-01-01

    Functional neuroimaging studies of decision-making so far mainly focused on decisions under uncertainty or negotiation with other persons. Dual process theory assumes that, in such situations, decision making relies on either a rapid intuitive, automated or a slower rational processing system. However, it still remains elusive how personality factors or professional requirements might modulate the decision process and the underlying neural mechanisms. Since decision making is a key task of managers, we hypothesized that managers, facing higher pressure for frequent and rapid decisions than non-managers, prefer the heuristic, automated decision strategy in contrast to non-managers. Such different strategies may, in turn, rely on different neural systems. We tested managers and non-managers in a functional magnetic resonance imaging study using a forced-choice paradigm on word-pairs. Managers showed subcortical activation in the head of the caudate nucleus, and reduced hemodynamic response within the cortex. In contrast, non-managers revealed the opposite pattern. With the head of the caudate nucleus being an initiating component for process automation, these results supported the initial hypothesis, hinting at automation during decisions in managers. More generally, the findings reveal how different professional requirements might modulate cognitive decision processing.

  17. Penyusunan Panduan Pengelolaan Keamanan Informasi Untuk Firewall Configuration Berdasarkan Kerangka Kerja PCI DSS v.3.1 dan COBIT 5

    Directory of Open Access Journals (Sweden)

    Bagus Puji Santoso

    2016-10-01

    Full Text Available Information security systems must be protected from all attacks and interuptions by an unauthorized user. Firewall is a mechanism that can be applied to improve the security information which done by filtering data packets that enter and exit the network. IT governance is needed to manage good information security. IT governance can use to make the arrangement of guidelines for the management of information security. This research aims to create a reference guide to information security such as an information security management guide for firewall configuration that refers to the framework of PCI DSS v.3.1 and COBIT 5 by taking a case study at the DSIK Universitas Airlangga.Arrangement of guidelines for information security management for firewall configuration will be done in three stages. The first stage was the arrangement of information security management procedures for firewall configuration which consists of mapping analysis stage process, arrangement procedure’s stage and determining roles and job description’s stage. In the second stage was the verification of the information security management guidance using a questionnaire. The third stage was improvement of the information security management guidance. These improvements was done to correct deficiencies that were produced when verification. The verification results show that 42.86% of respondents said that management guidelines are operationally very easy to be implemented.

  18. Dynamic process management for engineering environments

    NARCIS (Netherlands)

    Mentink, R.J.; van Houten, Frederikus J.A.M.; Kals, H.J.J.

    2003-01-01

    The research presented in this paper proposes a concept for dynamic process management as part of an integrated approach to engineering process support. The theory of information management is the starting point for the development of a process management system based on evolution of information

  19. Human Resource Management in the Enhancement Processes of Knowledge Management

    Directory of Open Access Journals (Sweden)

    Didi Sundiman

    2017-11-01

    Full Text Available This research explored Human Resource Management (HRM in enhancement processes of knowledge management. This research explored how HRM practice enhanced the operational of knowledge management. Data were collected by a survey by interviewing 12 informants from Small and Medium Enterprise (SME. The results show that HRM practice gives initiative in the enhancement process of the knowledge management strategy applied to the company. It can be concluded that each sub-component of HRM affects the components of knowledge management, and HRM is highly influential and has a positive effect on quality management processes and vice versa in the work environment.

  20. Performance Management of High Performance Computing for Medical Image Processing in Amazon Web Services.

    Science.gov (United States)

    Bao, Shunxing; Damon, Stephen M; Landman, Bennett A; Gokhale, Aniruddha

    2016-02-27

    Adopting high performance cloud computing for medical image processing is a popular trend given the pressing needs of large studies. Amazon Web Services (AWS) provide reliable, on-demand, and inexpensive cloud computing services. Our research objective is to implement an affordable, scalable and easy-to-use AWS framework for the Java Image Science Toolkit (JIST). JIST is a plugin for Medical-Image Processing, Analysis, and Visualization (MIPAV) that provides a graphical pipeline implementation allowing users to quickly test and develop pipelines. JIST is DRMAA-compliant allowing it to run on portable batch system grids. However, as new processing methods are implemented and developed, memory may often be a bottleneck for not only lab computers, but also possibly some local grids. Integrating JIST with the AWS cloud alleviates these possible restrictions and does not require users to have deep knowledge of programming in Java. Workflow definition/management and cloud configurations are two key challenges in this research. Using a simple unified control panel, users have the ability to set the numbers of nodes and select from a variety of pre-configured AWS EC2 nodes with different numbers of processors and memory storage. Intuitively, we configured Amazon S3 storage to be mounted by pay-for-use Amazon EC2 instances. Hence, S3 storage is recognized as a shared cloud resource. The Amazon EC2 instances provide pre-installs of all necessary packages to run JIST. This work presents an implementation that facilitates the integration of JIST with AWS. We describe the theoretical cost/benefit formulae to decide between local serial execution versus cloud computing and apply this analysis to an empirical diffusion tensor imaging pipeline.

  1. Performance management of high performance computing for medical image processing in Amazon Web Services

    Science.gov (United States)

    Bao, Shunxing; Damon, Stephen M.; Landman, Bennett A.; Gokhale, Aniruddha

    2016-03-01

    Adopting high performance cloud computing for medical image processing is a popular trend given the pressing needs of large studies. Amazon Web Services (AWS) provide reliable, on-demand, and inexpensive cloud computing services. Our research objective is to implement an affordable, scalable and easy-to-use AWS framework for the Java Image Science Toolkit (JIST). JIST is a plugin for Medical- Image Processing, Analysis, and Visualization (MIPAV) that provides a graphical pipeline implementation allowing users to quickly test and develop pipelines. JIST is DRMAA-compliant allowing it to run on portable batch system grids. However, as new processing methods are implemented and developed, memory may often be a bottleneck for not only lab computers, but also possibly some local grids. Integrating JIST with the AWS cloud alleviates these possible restrictions and does not require users to have deep knowledge of programming in Java. Workflow definition/management and cloud configurations are two key challenges in this research. Using a simple unified control panel, users have the ability to set the numbers of nodes and select from a variety of pre-configured AWS EC2 nodes with different numbers of processors and memory storage. Intuitively, we configured Amazon S3 storage to be mounted by pay-for- use Amazon EC2 instances. Hence, S3 storage is recognized as a shared cloud resource. The Amazon EC2 instances provide pre-installs of all necessary packages to run JIST. This work presents an implementation that facilitates the integration of JIST with AWS. We describe the theoretical cost/benefit formulae to decide between local serial execution versus cloud computing and apply this analysis to an empirical diffusion tensor imaging pipeline.

  2. Managing Variety in Configure-to-Order Products - An Operational Method

    DEFF Research Database (Denmark)

    Myrodia, Anna; Hvam, Lars

    2014-01-01

    is to develop an operational method to analyze profitability of Configure-To-Order (CTO) products. The operational method consists of a four-step: analysis of product assortment, profitability analysis on configured products, market and competitor analysis and, product assortment scenarios analysis....... The proposed operational method is firstly developed based on both available literature and practitioners experience and subsequently tested on a company that produces CTO products. The results from this application are further discussed and opportunities for further research identified....

  3. Integrating Process Management with Archival Management Systems: Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Gordon Daines, III

    2009-03-01

    Full Text Available The Integrated Digital Special Collections (INDI system is a prototype of a database-driven, Web application designed to automate and manage archival workflow for large institutions and consortia. This article discusses the how the INDI project enabled the successful implementation of a process to manage large technology projects in the Harold B. Lee Library at Brigham Young University. It highlights how the scope of these technology projects is set and how the major deliverables for each project are defined. The article also talks about how the INDI system followed the process and still failed to be completed. It examines why the process itself is successful and why the INDI project failed. It further underscores the importance of process management in archival management systems.

  4. THE ANALYSIS OF RISK MANAGEMENT PROCESS WITHIN MANAGEMENT

    Directory of Open Access Journals (Sweden)

    ROMANESCU MARCEL LAURENTIU

    2016-10-01

    Full Text Available This article highlights the risk analysis within management, focusing on how a company could practicaly integrate the risks management in the existing leading process. Subsequently, it is exemplified the way of manage risk effectively, which gives numerous advantages to all firms, including improving their decision-making process. All these lead to the conclusion that the degree of risk specific to companies is very high, but if managers make the best decisions then it can diminish it and all business activitiy and its income are not influenced by factors that could disturb in a negative way .

  5. Defense Waste Processing Facility Process Simulation Package Life Cycle

    International Nuclear Information System (INIS)

    Reuter, K.

    1991-01-01

    The Defense Waste Processing Facility (DWPF) will be used to immobilize high level liquid radioactive waste into safe, stable, and manageable solid form. The complexity and classification of the facility requires that a performance based operator training to satisfy Department of Energy orders and guidelines. A major portion of the training program will be the application and utilization of Process Simulation Packages to assist in training the Control Room Operators on the fluctionality of the process and the application of the Distribution Control System (DCS) in operating and managing the DWPF process. The packages are being developed by the DWPF Computer and Information Systems Simulation Group. This paper will describe the DWPF Process Simulation Package Life Cycle. The areas of package scope, development, validation, and configuration management will be reviewed and discussed in detail

  6. The Configuration Of Supply Chain Agritourism To Improve The Performance With Dynamic Programming

    Directory of Open Access Journals (Sweden)

    Sahnaz Ubud

    2015-09-01

    Full Text Available The purposes of this research is to implementation about  the configuration of Supply Chain Agritourism in Mekarsari Tours Garden and result a decision making  which must be done by top level management about their supply chain configuration. Because now Mekarsari, the biggest fruit garden in the world, have a lot of type of fruit which must be supply for the customer depend on the season with on time. So Mekarsari must know about their configuration from supplier to customer to improve their performance. The Respondents  for this research is selected based on the results of supply chain maping from the worker in the garden, the top level management until the end customer. Supply chian network is formed consisting of farm workers to the end customers, especially those located in the tourist are of green land zone.  The type of data is displayed in a supply chain modeling approach is to use the dynamic system. It’s consists of numeric data, the written data and mental models.  That data is collected and processed into a design model. The design model is using system dynamics methodology. In compiling the system dynamics model has been used software Vensim Professional Academic Ventana 5.7. The result of this research is a configuration of Supply Chain Agritourism which is developed from the supplier until the end customer in Mekarsari tours Garden. From the Dynamic Programming, the result is a decision making which must be done by the top level management to improve the supply chain performance, especially in the green land zone.

  7. Business Process Management Theory and Applications

    CERN Document Server

    2013-01-01

    Business Process Management (BPM) has been in existence for decades. It  uses, complements, integrates and extends theories, methods and tools from  other scientific disciplines like: strategic management, information technology, managerial accounting, operations management etc. During this period the main focus themes of researchers and professionals in BPM  were: business process modeling, business process analysis, activity based costing, business process simulation, performance measurement, workflow management, the link between information technology and BPM for process automation etc. More recently the focus moved to subjects like Knowledge Management, Enterprise Resource Planning (ERP) Systems, Service Oriented Architectures (SOAs), Process Intelligence (PI) and even  Social Networks. In this collection of papers we present a review of the work and the outcomes achieved in the classic BPM fields as well as a deeper insight on recent advances in BPM. We present a review of business process modeling a...

  8. Tests of Event Filter Configuration Software

    CERN Multimedia

    Wickens, F.J.

    TDAQ - Tests of Event Filter configuration software Within Trigger/DAQ a major consideration is how well the performance of the system components scale in going from the small set-ups used for development work to the final system with many hundreds of processors and links. In the case of the Event Filter, which makes the final stage of on-line event selection, plus on-line calibrations and monitoring, more than a thousand processors are envisaged. These processors will be divided into sub-farms, most will be remote from the detector and some could even be at institutes far from CERN. As part of the on-line system it is important that the software in the sub-farms can be reconfigured rapidly as runs start and stop, and that the system be fault tolerant. The flow of data inside a sub-farm involves many processes, for distribution and collection of results in addition to those for event processing itself. Supervision code written in Java has been developed to manage the processes within a cluster, with XML f...

  9. Evolution of the Configuration Database Design

    International Nuclear Information System (INIS)

    Salnikov, A.

    2006-01-01

    The BABAR experiment at SLAC successfully collects physics data since 1999. One of the major parts of its on-line system is the configuration database which provides other parts of the system with the configuration data necessary for data taking. Originally the configuration database was implemented in the Objectivity/DB ODBMS. Recently BABAR performed a successful migration of its event store from Objectivity/DB to ROOT and this prompted a complete phase-out of the Objectivity/DB in all other BABAR databases. It required the complete redesign of the configuration database to hide any implementation details and to support multiple storage technologies. In this paper we describe the process of the migration of the configuration database, its new design, implementation strategy and details

  10. Dynamic airspace configuration by genetic algorithm

    Directory of Open Access Journals (Sweden)

    Marina Sergeeva

    2017-06-01

    Full Text Available With the continuous air traffic growth and limits of resources, there is a need for reducing the congestion of the airspace systems. Nowadays, several projects are launched, aimed at modernizing the global air transportation system and air traffic management. In recent years, special interest has been paid to the solution of the dynamic airspace configuration problem. Airspace sector configurations need to be dynamically adjusted to provide maximum efficiency and flexibility in response to changing weather and traffic conditions. The main objective of this work is to automatically adapt the airspace configurations according to the evolution of traffic. In order to reach this objective, the airspace is considered to be divided into predefined 3D airspace blocks which have to be grouped or ungrouped depending on the traffic situation. The airspace structure is represented as a graph and each airspace configuration is created using a graph partitioning technique. We optimize airspace configurations using a genetic algorithm. The developed algorithm generates a sequence of sector configurations for one day of operation with the minimized controller workload. The overall methodology is implemented and successfully tested with air traffic data taken for one day and for several different airspace control areas of Europe.

  11. Utilizing product configuration systems for supporting the critical parts of the engineering processes

    DEFF Research Database (Denmark)

    Kristjansdottir, Katrin; Shafiee, Sara; Hvam, Lars

    2016-01-01

    Engineering-To-Order (ETO) companies have to respond to increasing demands to provide highly customized and complex products with high quality at competitive prices. In order to respond to those challenges ETO companies have started to implement product configuration systems (PCS) to increase...... to be supported with the PCSs is not described in the current literature. This paper aims to pursue that research opportunity by presenting a framework, which aims to identifying the critical parts of the engineering processes in order to identify where it most beneficial to implement a PCSs and how to prioritize...

  12. Dissociated neural processing for decisions in managers and non-managers.

    Directory of Open Access Journals (Sweden)

    Svenja Caspers

    Full Text Available Functional neuroimaging studies of decision-making so far mainly focused on decisions under uncertainty or negotiation with other persons. Dual process theory assumes that, in such situations, decision making relies on either a rapid intuitive, automated or a slower rational processing system. However, it still remains elusive how personality factors or professional requirements might modulate the decision process and the underlying neural mechanisms. Since decision making is a key task of managers, we hypothesized that managers, facing higher pressure for frequent and rapid decisions than non-managers, prefer the heuristic, automated decision strategy in contrast to non-managers. Such different strategies may, in turn, rely on different neural systems. We tested managers and non-managers in a functional magnetic resonance imaging study using a forced-choice paradigm on word-pairs. Managers showed subcortical activation in the head of the caudate nucleus, and reduced hemodynamic response within the cortex. In contrast, non-managers revealed the opposite pattern. With the head of the caudate nucleus being an initiating component for process automation, these results supported the initial hypothesis, hinting at automation during decisions in managers. More generally, the findings reveal how different professional requirements might modulate cognitive decision processing.

  13. Risk-based configuration control system: Analysis and approaches

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Vesely, W.E.; Lofgren, E.V.

    1989-01-01

    This paper presents an evaluation of the configuration risks associated with the operation of a nuclear power plant and the approaches to control these risks using risk-based configuration control considerations. In that context, the actual and maximum potential configuration risks at a plant are analyzed and the alternative types criteria for a risk-based configuration control systems are described. The risk-based configuration calculations which are studied here focus on the core-melt frequency impacts from given plant configurations. By calculating the core-melt frequency for given configurations, the configurations which cause large core-melt frequency increases can be identified and controlled. The duration time in which the configuration can exist can then be limited or the core-melt frequency level associated with the configuration can be reduced by various actions. Furthermore, maintenances and tests can be scheduled to avoid the configurations which cause large core-melt frequency increases. Present technical specifications do not control many of these configurations which can cause large core-melt frequency increases but instead focus on many risk-unimportant allowed outage times. Hence, risk-based configuration management can be effectively used to reduce core-melt frequency associated risks at a plant and at the same time can provide flexibility in plant operation. The alternative strategies for controlling the core-melt frequency and other risk contributions include: (1) controlling the increased risk level which is associated with the configuration; (2) controlling the individual configuration risk which is associated with a given duration of a configuration; (3) controlling the time period configuration risk from configurations which occur in a time period

  14. A new approach for ATLAS Athena job configuration

    CERN Document Server

    Lampl, Walter; The ATLAS collaboration

    2018-01-01

    The offline software framework of the ATLAS experiment (Athena) consists of many small components of various types like Algorithm, Tool or Service. To assemble these components into an executable application for event processing, a dedicated configuration step is necessary. The configuration of a particular job depends on the workflow (simulation, reconstruction, high-level trigger, overlay, calibration, analysis ...) and the input data (real or simulated data, beam-energy, ...) leading to a large number of possible configurations. The configuration step is done by executing python code. The resulting configuration depends on optionally pre-set flags as well as meta-data about the data to be processed that is found by peeking into the input file and even into databases. For the python configuration code, there is almost no structure enforced, leaving the full power of python to the user. While this approach did work, it also proved to be error prone and complicated to use. It also leads to jobs containing mor...

  15. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  16. Conceptual design of cost-effective and environmentally-friendly configurations for fuel ethanol production from sugarcane by knowledge-based process synthesis.

    Science.gov (United States)

    Sánchez, Óscar J; Cardona, Carlos A

    2012-01-01

    In this work, the hierarchical decomposition methodology was used to conceptually design the production of fuel ethanol from sugarcane. The decomposition of the process into six levels of analysis was carried out. Several options of technological configurations were assessed in each level considering economic and environmental criteria. The most promising alternatives were chosen rejecting the ones with a least favorable performance. Aspen Plus was employed for simulation of each one of the technological configurations studied. Aspen Icarus was used for economic evaluation of each configuration, and WAR algorithm was utilized for calculation of the environmental criterion. The results obtained showed that the most suitable synthesized flowsheet involves the continuous cultivation of Zymomonas mobilis with cane juice as substrate and including cell recycling and the ethanol dehydration by molecular sieves. The proposed strategy demonstrated to be a powerful tool for conceptual design of biotechnological processes considering both techno-economic and environmental indicators. Copyright © 2011 Elsevier Ltd. All rights reserved.

  17. Sample and data management process description

    International Nuclear Information System (INIS)

    Kessner, J.H.

    2000-01-01

    The sample and data management process was initiated in 1994 as a result of a process improvement workshop. The purpose of the workshop was to develop a sample and data management process that would reduce cycle time and costs, simplify systems and procedures, and improve customer satisfaction for sampling, analytical services, and data management activities

  18. Energy savings in distillation via identification of useful configurations

    Science.gov (United States)

    Shah, Vishesh Hemanshu

    Recent market and environmental forces require the rapid development of better and cheaper separation process solutions. Especially for multicomponent mixtures, there are several feasible separation process solutions differing significantly in cost and energy consumption in spite of carrying out the same overall process. Therefore a systematic method to identify and design optimal multicomponent separation sequences is needed instead of relying on the inventive activity of a few experienced engineers. Even for a commonly perceived "mature" technology such as distillation, until recently there has been an absence of systematic methods to (i) elucidate all possible separation configurations and to (ii) identify energy efficient candidates. This research aims to address these needs. In this work, we focus on the continuous distillation of non-azeotropic mixtures into n distinct composition final product streams. We develop a computationally efficient and easy-to-use mathematical framework to generate all the basic distillation configurations that use exactly (n-1) distillation columns to carry out this n-component separation. We extend the framework to generate all the additional distillation configurations with thermal coupling. We observe that the search space of distillation configurations grows very rapidly as the number of product streams increases. For instance, for a mixture to be separated into 4 product streams, we can choose from 18 basic configurations and 134 additional configurations with thermal coupling; while for a mixture to be separated into 8 product streams, we can choose from 15,767,207 basic configurations and 29,006,926,681 additional configurations with thermal coupling. The next challenge for a process engineer is to be able to quickly prune the search space to a handful of attractive energy efficient candidates that can be studied in greater detail. To this effect, we develop a quick screening optimization tool that identifies configurations

  19. SNF Project Engineering Process Improvement Plan

    International Nuclear Information System (INIS)

    DESAI, S.P.

    2000-01-01

    This plan documents the SNF Project activities and plans to support its engineering process. It describes five SNF Project Engineering initiatives: new engineering procedures, qualification cards process; configuration management, engineering self assessments, and integrated schedule for engineering activities

  20. SU-E-P-59: A Graphical Interface for XCAT Phantom Configuration, Generation and Processing

    International Nuclear Information System (INIS)

    Myronakis, M; Cai, W; Dhou, S; Cifter, F; Lewis, J; Hurwitz, M

    2015-01-01

    Purpose: To design a comprehensive open-source, publicly available, graphical user interface (GUI) to facilitate the configuration, generation, processing and use of the 4D Extended Cardiac-Torso (XCAT) phantom. Methods: The XCAT phantom includes over 9000 anatomical objects as well as respiratory, cardiac and tumor motion. It is widely used for research studies in medical imaging and radiotherapy. The phantom generation process involves the configuration of a text script to parameterize the geometry, motion, and composition of the whole body and objects within it, and to generate simulated PET or CT images. To avoid the need for manual editing or script writing, our MATLAB-based GUI uses slider controls, drop-down lists, buttons and graphical text input to parameterize and process the phantom. Results: Our GUI can be used to: a) generate parameter files; b) generate the voxelized phantom; c) combine the phantom with a lesion; d) display the phantom; e) produce average and maximum intensity images from the phantom output files; f) incorporate irregular patient breathing patterns; and f) generate DICOM files containing phantom images. The GUI provides local help information using tool-tip strings on the currently selected phantom, minimizing the need for external documentation. The DICOM generation feature is intended to simplify the process of importing the phantom images into radiotherapy treatment planning systems or other clinical software. Conclusion: The GUI simplifies and automates the use of the XCAT phantom for imaging-based research projects in medical imaging or radiotherapy. This has the potential to accelerate research conducted with the XCAT phantom, or to ease the learning curve for new users. This tool does not include the XCAT phantom software itself. We would like to acknowledge funding from MRA, Varian Medical Systems Inc

  1. SU-E-P-59: A Graphical Interface for XCAT Phantom Configuration, Generation and Processing

    Energy Technology Data Exchange (ETDEWEB)

    Myronakis, M; Cai, W; Dhou, S; Cifter, F; Lewis, J [Brigham and Women’s Hospital, Boston, MA (United States); Hurwitz, M [Newton, MA (United States)

    2015-06-15

    Purpose: To design a comprehensive open-source, publicly available, graphical user interface (GUI) to facilitate the configuration, generation, processing and use of the 4D Extended Cardiac-Torso (XCAT) phantom. Methods: The XCAT phantom includes over 9000 anatomical objects as well as respiratory, cardiac and tumor motion. It is widely used for research studies in medical imaging and radiotherapy. The phantom generation process involves the configuration of a text script to parameterize the geometry, motion, and composition of the whole body and objects within it, and to generate simulated PET or CT images. To avoid the need for manual editing or script writing, our MATLAB-based GUI uses slider controls, drop-down lists, buttons and graphical text input to parameterize and process the phantom. Results: Our GUI can be used to: a) generate parameter files; b) generate the voxelized phantom; c) combine the phantom with a lesion; d) display the phantom; e) produce average and maximum intensity images from the phantom output files; f) incorporate irregular patient breathing patterns; and f) generate DICOM files containing phantom images. The GUI provides local help information using tool-tip strings on the currently selected phantom, minimizing the need for external documentation. The DICOM generation feature is intended to simplify the process of importing the phantom images into radiotherapy treatment planning systems or other clinical software. Conclusion: The GUI simplifies and automates the use of the XCAT phantom for imaging-based research projects in medical imaging or radiotherapy. This has the potential to accelerate research conducted with the XCAT phantom, or to ease the learning curve for new users. This tool does not include the XCAT phantom software itself. We would like to acknowledge funding from MRA, Varian Medical Systems Inc.

  2. Process Management Practices In Healthcare Institutions

    Directory of Open Access Journals (Sweden)

    Şükrü Kılıç

    2015-09-01

    Full Text Available Healthcare institutions differ from other service businesses by their “matrix organizational structure” and “error-free output” requirement. However, the processes stay the same for all organizational activities at different levels. One of the post-modern management approach is to focus on basis of necessary processes and fundamental organizational changes. This case study aims to initially explain the characteristics of healthcare institutions and the basic conceptual properties of process and process management. Then the effect of the “management throughprocesses approach” over organization will be discussed. Finally; process management at healthcare institutions, scope of health care and examples of the other post-modern approaches will be examined with their outputs

  3. Validation and configuration management plan for the KE basins KE-PU spreadsheet code

    International Nuclear Information System (INIS)

    Harris, R.A.

    1996-01-01

    This report provides documentation of the spreadsheet KE-PU software that is used to verify compliance with the Operational Safety Requirement and Process Standard limit on the amount of plutonium in the KE-Basin sandfilter backwash pit. Included are: A summary of the verification of the method and technique used in KE-PU that were documented elsewhere, the requirements, plans, and results of validation tests that confirm the proper functioning of the software, the procedures and approvals required to make changes to the software, and the method used to maintain configuration control over the software

  4. Business process quality management

    NARCIS (Netherlands)

    Reijers, H.A.; Mendling, J.; Recker, J.; Brocke, vom J.; Rosemann, M.

    2010-01-01

    Abstract Process modeling is a central element in any approach to Business Process Management (BPM). However, what hinders both practitioners and aca demics is the lack of support for assessing the quality of process models — let alone realizing high quality process models. Existing frameworks are

  5. Transportation and disposal configuration for DOE-managed low-level and mixed low-level waste

    International Nuclear Information System (INIS)

    Johnsen, T.

    1993-06-01

    This report briefly examines the current U.S. Department of Energy complex-wide configuration for transportation and disposal of low-level and mixed low-level waste, and also retraces the historical sequence of events and rationale that has guided its development. The study determined that Nevada Test Site and the Hanford Site are the only two sites that currently provide substantial disposal services for offsite low-level waste generators. It was also determined that mixed low-level waste shipments are infrequent and are generally limited to shipments to offsite commercial treatment facilities or other Department of Energy sites for storage. The current alignment of generator to disposal site for low-level waste shipments is generally consistent with the programmatic mission of the generator; that is, defense-generated waste is shipped to the Nevada Test Site and research-generated waste is transported to the Hanford Site. The historical development of the current configuration was resurrected by retrieving Department of Energy documentation and interviewing both current and former department and contractor personnel. According to several accounts, the basic framework of the system was developed during the late 1970s, and was reportedly based on the ability of the disposal site to manage a given waste form. Documented evidence to support this reasoning, however, could not be uncovered

  6. Managing Process Variants in the Process Life Cycle

    NARCIS (Netherlands)

    Hallerbach, A.; Bauer, Th.; Reichert, M.U.

    2007-01-01

    When designing process-aware information systems, often variants of the same process have to be specified. Each variant then constitutes an adjustment of a particular process to specific requirements building the process context. Current Business Process Management (BPM) tools do not adequately

  7. Continuous Security and Configuration Monitoring of HPC Clusters

    Energy Technology Data Exchange (ETDEWEB)

    Garcia-Lomeli, H. D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Bertsch, A. D. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Fox, D. M. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-05-08

    Continuous security and configuration monitoring of information systems has been a time consuming and laborious task for system administrators at the High Performance Computing (HPC) center. Prior to this project, system administrators had to manually check the settings of thousands of nodes, which required a significant number of hours rendering the old process ineffective and inefficient. This paper explains the application of Splunk Enterprise, a software agent, and a reporting tool in the development of a user application interface to track and report on critical system updates and security compliance status of HPC Clusters. In conjunction with other configuration management systems, the reporting tool is to provide continuous situational awareness to system administrators of the compliance state of information systems. Our approach consisted of the development, testing, and deployment of an agent to collect any arbitrary information across a massively distributed computing center, and organize that information into a human-readable format. Using Splunk Enterprise, this raw data was then gathered into a central repository and indexed for search, analysis, and correlation. Following acquisition and accumulation, the reporting tool generated and presented actionable information by filtering the data according to command line parameters passed at run time. Preliminary data showed results for over six thousand nodes. Further research and expansion of this tool could lead to the development of a series of agents to gather and report critical system parameters. However, in order to make use of the flexibility and resourcefulness of the reporting tool the agent must conform to specifications set forth in this paper. This project has simplified the way system administrators gather, analyze, and report on the configuration and security state of HPC clusters, maintaining ongoing situational awareness. Rather than querying each cluster independently, compliance checking

  8. Issues Management Process Course # 38401

    Energy Technology Data Exchange (ETDEWEB)

    Binion, Ula Marie [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-02-01

    The purpose of this training it to advise Issues Management Coordinators (IMCs) on the revised Contractor Assurance System (CAS) Issues Management (IM) process. Terminal Objectives: Understand the Laboratory’s IM process; Understand your role in the Laboratory’s IM process. Learning Objectives: Describe the IM process within the context of the CAS; Describe the importance of implementing an institutional IM process at LANL; Describe the process flow for the Laboratory’s IM process; Apply the definition of an issue; Use available resources to determine initial screening risk levels for issues; Describe the required major process steps for each risk level; Describe the personnel responsibilities for IM process implementation; Access available resources to support IM process implementation.

  9. Modelling Configuration Knowledge in Heterogeneous Product Families

    DEFF Research Database (Denmark)

    Queva, Matthieu Stéphane Benoit; Männistö, Tomi; Ricci, Laurent

    2011-01-01

    Product configuration systems play an important role in the development of Mass Customisation. The configuration of complex product families may nowadays involve multiple design disciplines, e.g. hardware, software and services. In this paper, we present a conceptual approach for modelling...... the variability in such heterogeneous product families. Our approach is based on a framework that aims to cater for the different stakeholders involved in the modelling and management of the product family. The modelling approach is centred around the concepts of views, types and constraints and is illustrated...... by a motivation example. Furthermore, as a proof of concept, a prototype has been implemented for configuring a non-trivial heterogeneous product family....

  10. Knowledge information management toolkit and method

    Science.gov (United States)

    Hempstead, Antoinette R.; Brown, Kenneth L.

    2006-08-15

    A system is provided for managing user entry and/or modification of knowledge information into a knowledge base file having an integrator support component and a data source access support component. The system includes processing circuitry, memory, a user interface, and a knowledge base toolkit. The memory communicates with the processing circuitry and is configured to store at least one knowledge base. The user interface communicates with the processing circuitry and is configured for user entry and/or modification of knowledge pieces within a knowledge base. The knowledge base toolkit is configured for converting knowledge in at least one knowledge base from a first knowledge base form into a second knowledge base form. A method is also provided.

  11. Observed benefits from product configuration systems

    DEFF Research Database (Denmark)

    Hvam, Lars; Haug, Anders; Mortensen, Niels Henrik

    2013-01-01

    This article presents a study of the benefits obtained from applying product configuration systems based on a case study in four industry companies. The impacts are described according to main objectives in literature for imple-menting product configuration systems: lead time in the specification...... affected by the use of product configu-ration systems e.g. increased sales, decrease in the number of SKU's, improved ability to introduce new products, and cost reductions.......This article presents a study of the benefits obtained from applying product configuration systems based on a case study in four industry companies. The impacts are described according to main objectives in literature for imple-menting product configuration systems: lead time in the specification...... processes, on-time delivery of the specifica-tions, and resource consumption for making specifications, quality of specifications, optimization of products and services, and other observations. The purpose of the study is partly to identify specific impacts observed from implementing product configuration...

  12. Impact of reactor configuration on anammox process start-up: MBR versus SBR.

    Science.gov (United States)

    Tao, Yu; Gao, Da-Wen; Fu, Yuan; Wu, Wei-Min; Ren, Nan-Qi

    2012-01-01

    Anaerobic ammonium oxidation (anammox) is an energy saving biological nitrogen removal process which was limited to slow growth rate of anammox bacteria during start-up period. This study investigated the start-up of anammox process by a laboratory sequential batch reactor (SBR) for 218 days and subsequently modified the reactor as a membrane bioreactor (MBR) for 178 days. Modification of a SBR as MBR with installation of an external membrane module resulted in acceleration of specific anammox activity by 19 times. The acceleration of specific anammox activity with MBR was further confirmed by starting-up another MBR for a 242 day period. Molecular microbial analyses showed that Candidatus "Brocadia anammoxidans" and Candidatus "Kuenenia stuttgartiensis" were the dominant species in the inocula and biomass developed in the reactor. The start-up with MBR appeared to be more effective than SBR for the enrichment of anammox bacteria due to high sludge retention property of MBR configuration. Copyright © 2011 Elsevier Ltd. All rights reserved.

  13. Adaptive Process Management with ADEPT2

    NARCIS (Netherlands)

    Reichert, M.U.; Rinderle, S.B.; Kreher, U; Dadam, P.

    2005-01-01

    This demo paper describes core functions of the ADEPT2 process management system. In the ADEPT project we have been working on the design and implementation of a next generation process management software. Based on a conceptual framework for dynamic process changes, on novel process support

  14. Management functions, issues, and configuration alternatives: TO support a transportation management configuration study: [Final report

    International Nuclear Information System (INIS)

    1987-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) of the Department of Energy (DOE) is responsible for the safe transporation and disposal of spent nuclear fuel from utility-owned nuclear power generation reactors and high-level radioactive waste from both defense and civilian generators to long-term storage repositories. Given the volume, duration, and sensitivity of the operation, DOE is seeking not only the safest and best transportation system but also the most effective and resource-efficient management concept. Within the general guidelines of the Nuclear Waste Policy Act (NWPA) of 1982 calling for the fullest possible use of private industry contracts, this study examines the technical and administrative functions as well as the key issues to be addressed in the formation of a management structure. In order to stand alone as a comprehensive treatment of the total requirement, the material contained in many seperate and sometimes divergent DOE/OCRWM documents was evaluated and is compiled here. An attempt was made to succinctly define the nature of the problem, the objectives and scope of both the operating and management systems, and then to dissect the functions required in order to meet the objectives and operating functions are listed and described

  15. Configurations of NPD : production interfaces and interface integration mechanisms

    NARCIS (Netherlands)

    Smulders, F.E.H.M.; Boer, H.; Hansen, P.H.K.; Gubi, E.; Dorst, C.H.

    2002-01-01

    This paper describes and illustrates different configurations of the interface between new product development and production processes, including both intra–firm and inter–firm interfaces. These configurations are partly based on a process view of product innovation and partly on a structural view

  16. Implementing process safety management in gas processing operations

    International Nuclear Information System (INIS)

    Rodman, D.L.

    1992-01-01

    The Occupational Safety and Health Administration (OSHA) standard entitled Process Safety Management of Highly Hazardous Chemicals; Explosives and Blasting Agents was finalized February 24, 1992. The purpose of the standard is to prevent or minimize consequences of catastrophic releases of toxic, flammable, or explosive chemicals. OSHA believes that its rule will accomplish this goal by requiring a comprehensive management program that integrates technologies, procedures, and management practices. Gas Processors Association (GPA) member companies are significantly impacted by this major standard, the requirements of which are extensive and complex. The purpose of this paper is to review the requirements of the standard and to discuss the elements to consider in developing and implementing a viable long term Process Safety Management Program

  17. Combined application of Product Lifecycle and Software Configuration Management systems for ITER remote handling

    International Nuclear Information System (INIS)

    Muhammad, Ali; Esque, Salvador; Aha, Liisa; Mattila, Jouni; Siuko, Mikko; Vilenius, Matti; Jaervenpaeae, Jorma; Irving, Mike; Damiani, Carlo; Semeraro, Luigi

    2009-01-01

    The advantages of Product Lifecycle Management (PLM) systems are widely understood among the industry and hence a PLM system is already in use by International Thermonuclear Experimental Reactor (ITER) Organization (IO). However, with the increasing involvement of software in the development, the role of Software Configuration Management (SCM) systems have become equally important. The SCM systems can be useful to meet the higher demands on Safety Engineering (SE), Quality Assurance (QA), Validation and Verification (V and V) and Requirements Management (RM) of the developed software tools. In an experimental environment, such as ITER, the new remote handling requirements emerge frequently. This means the development of new tools or the modification of existing tools and the development of new remote handling procedures or the modification of existing remote handling procedures. PLM and SCM systems together can be of great advantage in the development and maintenance of such remote handling system. In this paper, we discuss how PLM and SCM systems can be integrated together and play their role during the development and maintenance of ITER remote handling system. We discuss the possibility to investigate such setup at DTP2 (Divertor Test Platform 2), which is the full scale mock-up facility to verify the ITER divertor remote handling and maintenance concepts.

  18. BUSINESS PROCESS MANAGEMENT SYSTEMS TECHNOLOGY COMPONENTS ANALYSIS

    Directory of Open Access Journals (Sweden)

    Andrea Giovanni Spelta

    2007-05-01

    Full Text Available The information technology that supports the implementation of the business process management appproach is called Business Process Management System (BPMS. The main components of the BPMS solution framework are process definition repository, process instances repository, transaction manager, conectors framework, process engine and middleware. In this paper we define and characterize the role and importance of the components of BPMS's framework. The research method adopted was the case study, through the analysis of the implementation of the BPMS solution in an insurance company called Chubb do Brasil. In the case study, the process "Manage Coinsured Events"" is described and characterized, as well as the components of the BPMS solution adopted and implemented by Chubb do Brasil for managing this process.

  19. Management of Technology - a political process approach

    DEFF Research Database (Denmark)

    Koch, Christian

    1999-01-01

    Most management of technology writings fail to address enterprise developments as political processes, where visions, coalitions and emergence are central features. The paper report of a participants observation study of management of technology processes.......Most management of technology writings fail to address enterprise developments as political processes, where visions, coalitions and emergence are central features. The paper report of a participants observation study of management of technology processes....

  20. Managing Software Process Evolution

    DEFF Research Database (Denmark)

    This book focuses on the design, development, management, governance and application of evolving software processes that are aligned with changing business objectives, such as expansion to new domains or shifting to global production. In the context of an evolving business world, it examines...... the complete software process lifecycle, from the initial definition of a product to its systematic improvement. In doing so, it addresses difficult problems, such as how to implement processes in highly regulated domains or where to find a suitable notation system for documenting processes, and provides...... essential insights and tips to help readers manage process evolutions. And last but not least, it provides a wealth of examples and cases on how to deal with software evolution in practice. Reflecting these topics, the book is divided into three parts. Part 1 focuses on software business transformation...

  1. Configuration and specifications of an Unmanned Aerial Vehicle (UAV for early site specific weed management.

    Directory of Open Access Journals (Sweden)

    Jorge Torres-Sánchez

    Full Text Available A new aerial platform has risen recently for image acquisition, the Unmanned Aerial Vehicle (UAV. This article describes the technical specifications and configuration of a UAV used to capture remote images for early season site- specific weed management (ESSWM. Image spatial and spectral properties required for weed seedling discrimination were also evaluated. Two different sensors, a still visible camera and a six-band multispectral camera, and three flight altitudes (30, 60 and 100 m were tested over a naturally infested sunflower field. The main phases of the UAV workflow were the following: 1 mission planning, 2 UAV flight and image acquisition, and 3 image pre-processing. Three different aspects were needed to plan the route: flight area, camera specifications and UAV tasks. The pre-processing phase included the correct alignment of the six bands of the multispectral imagery and the orthorectification and mosaicking of the individual images captured in each flight. The image pixel size, area covered by each image and flight timing were very sensitive to flight altitude. At a lower altitude, the UAV captured images of finer spatial resolution, although the number of images needed to cover the whole field may be a limiting factor due to the energy required for a greater flight length and computational requirements for the further mosaicking process. Spectral differences between weeds, crop and bare soil were significant in the vegetation indices studied (Excess Green Index, Normalised Green-Red Difference Index and Normalised Difference Vegetation Index, mainly at a 30 m altitude. However, greater spectral separability was obtained between vegetation and bare soil with the index NDVI. These results suggest that an agreement among spectral and spatial resolutions is needed to optimise the flight mission according to every agronomical objective as affected by the size of the smaller object to be discriminated (weed plants or weed patches.

  2. Configuration and specifications of an Unmanned Aerial Vehicle (UAV) for early site specific weed management.

    Science.gov (United States)

    Torres-Sánchez, Jorge; López-Granados, Francisca; De Castro, Ana Isabel; Peña-Barragán, José Manuel

    2013-01-01

    A new aerial platform has risen recently for image acquisition, the Unmanned Aerial Vehicle (UAV). This article describes the technical specifications and configuration of a UAV used to capture remote images for early season site- specific weed management (ESSWM). Image spatial and spectral properties required for weed seedling discrimination were also evaluated. Two different sensors, a still visible camera and a six-band multispectral camera, and three flight altitudes (30, 60 and 100 m) were tested over a naturally infested sunflower field. The main phases of the UAV workflow were the following: 1) mission planning, 2) UAV flight and image acquisition, and 3) image pre-processing. Three different aspects were needed to plan the route: flight area, camera specifications and UAV tasks. The pre-processing phase included the correct alignment of the six bands of the multispectral imagery and the orthorectification and mosaicking of the individual images captured in each flight. The image pixel size, area covered by each image and flight timing were very sensitive to flight altitude. At a lower altitude, the UAV captured images of finer spatial resolution, although the number of images needed to cover the whole field may be a limiting factor due to the energy required for a greater flight length and computational requirements for the further mosaicking process. Spectral differences between weeds, crop and bare soil were significant in the vegetation indices studied (Excess Green Index, Normalised Green-Red Difference Index and Normalised Difference Vegetation Index), mainly at a 30 m altitude. However, greater spectral separability was obtained between vegetation and bare soil with the index NDVI. These results suggest that an agreement among spectral and spatial resolutions is needed to optimise the flight mission according to every agronomical objective as affected by the size of the smaller object to be discriminated (weed plants or weed patches).

  3. Toward risk-based control of nuclear power plant configurations

    International Nuclear Information System (INIS)

    Samanta, P.K.; Veseley, W.E.; Kim, I.S.

    1992-01-01

    This paper presents an evaluation of the configuration risks associated with the operation of a nuclear power plant and the approaches to control these risks using risk-based configuration control considerations. In that context, the actual and maximum potential configuration risks at a plant are analyzed and the alternative types criteria for a risk-based configuration control systems are described. The risk-based configuration calculations which are studied here focus on the core-melt frequency impacts from given plant configurations, the configurations which cause large core-melt frequency increases can be identified and controlled. The duration time in which the configuration can exist can then be limited or the core-melt frequency level associated with the configuration can be reduced by various actions. Futhermore, maintenances and tests can be scheduled to avoid the configurations which cause large core-melt frequency increases. Present technical specifications do not control many of these configurations which can cause large core-melt frequency increases but instead focus on many risk-unimportant allowed outage times. Hence, risk-based configuration management can be effectively used to reduce core-melt frequency associated risks at a plant and at the same time can provide flexibility in plant operation. The alternative strategies for controlling the core-melt frequency and other risk contributions include: (1) controlling the increased risk level which is associated with the configuration; (2) controlling the individual configuration risk which is associated with a given duration of a configuration; (3) controlling the time period configuration risk from configurations which occur in a time period. (orig.)

  4. A Study on the Functional Elements of Configuration Management throughout the Life Cycle of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Yeom, C. S.; Cho, Y. S.

    2013-01-01

    Configuration Management (CM) is a technical and management process for maintaining consistency and traceability of any performance, functional and physical attributes of SSCs (Structures, Systems, or Components) with its requirements, design, and operational information. SSCs are the elements which make up a 'facility.' A structure is an element that provides support or enclosure. A system is a collection of components assembled to perform a specific facility function(s). A component is an active or passive item of equipment such as a pump, valve, relay, or an element of a large array such as pipe segments, elbows or reducers. For applying CM to nuclear industry, it is necessary to investigate and define the functional elements comprising CM. The elements can be used in planning and executing CM. Appropriate application of CM elements enables a user to plan and implement a CM program for SSCs of NPP. Although each element is separated, its implementation should not be performed in isolation because the CM elements should be balanced, consistent, and tracked. The degree of CM elements' application varies over the life cycle of NPP. The degree of rigor and techniques used in implementing CM is commensurate with type of NPP and its application environment as defined by the CM program requirements. For the consideration, it is necessary to make a CM STANDARD, and HANDBOOK or GUIDELINE for enabling more effective planning and implementing CM in nuclear industry

  5. Supporting Tablet Configuration, Tracking, and Infection Control Practices in Digital Health Interventions: Study Protocol.

    Science.gov (United States)

    Furberg, Robert D; Ortiz, Alexa M; Zulkiewicz, Brittany A; Hudson, Jordan P; Taylor, Olivia M; Lewis, Megan A

    2016-06-27

    Tablet-based health care interventions have the potential to encourage patient care in a timelier manner, allow physicians convenient access to patient records, and provide an improved method for patient education. However, along with the continued adoption of tablet technologies, there is a concomitant need to develop protocols focusing on the configuration, management, and maintenance of these devices within the health care setting to support the conduct of clinical research. Develop three protocols to support tablet configuration, tablet management, and tablet maintenance. The Configurator software, Tile technology, and current infection control recommendations were employed to develop three distinct protocols for tablet-based digital health interventions. Configurator is a mobile device management software specifically for iPhone operating system (iOS) devices. The capabilities and current applications of Configurator were reviewed and used to develop the protocol to support device configuration. Tile is a tracking tag associated with a free mobile app available for iOS and Android devices. The features associated with Tile were evaluated and used to develop the Tile protocol to support tablet management. Furthermore, current recommendations on preventing health care-related infections were reviewed to develop the infection control protocol to support tablet maintenance. This article provides three protocols: the Configurator protocol, the Tile protocol, and the infection control protocol. These protocols can help to ensure consistent implementation of tablet-based interventions, enhance fidelity when employing tablets for research purposes, and serve as a guide for tablet deployments within clinical settings.

  6. Management of processes of electrochemical dimensional processing

    Science.gov (United States)

    Akhmetov, I. D.; Zakirova, A. R.; Sadykov, Z. B.

    2017-09-01

    In different industries a lot high-precision parts are produced from hard-processed scarce materials. Forming such details can only be acting during non-contact processing, or a minimum of effort, and doable by the use, for example, of electro-chemical processing. At the present stage of development of metal working processes are important management issues electrochemical machining and its automation. This article provides some indicators and factors of electrochemical machining process.

  7. Informatics in Radiology (infoRAD): personal computer security: part 2. Software Configuration and file protection.

    Science.gov (United States)

    Caruso, Ronald D

    2004-01-01

    Proper configuration of software security settings and proper file management are necessary and important elements of safe computer use. Unfortunately, the configuration of software security options is often not user friendly. Safe file management requires the use of several utilities, most of which are already installed on the computer or available as freeware. Among these file operations are setting passwords, defragmentation, deletion, wiping, removal of personal information, and encryption. For example, Digital Imaging and Communications in Medicine medical images need to be anonymized, or "scrubbed," to remove patient identifying information in the header section prior to their use in a public educational or research environment. The choices made with respect to computer security may affect the convenience of the computing process. Ultimately, the degree of inconvenience accepted will depend on the sensitivity of the files and communications to be protected and the tolerance of the user. Copyright RSNA, 2004

  8. Theoretical concepts "land management process", "land management procedure" and their relationships

    Directory of Open Access Journals (Sweden)

    Tretiak A.M.

    2017-08-01

    Full Text Available The state significance of land management activities is manifested in those legal consequences that arise after the issuance of land management documentation and are conditioned by the need to secure unsupported land rights and the use and protection of land in a state-guaranteed manner. The procedural activity of land surveyors and other persons authorized by the state to commit land management operations must be carried out in a certain order established by the state and obey the rights and obligations of the persons specified by the legislation at each stage of the development of such relations.The main goal of applying to land management organizations and land surveyors is landuse documentation, which is made in accordance with the requirements of the law and with which the relevant legal properties of the land management procedure are associated. First of all, let's dwell on such basic concepts as "land management process" and "land management procedure". Consideration of the term "land management process" implies a preliminary analysis of the category "process". At the same time, it must be admitted that the development of the procedural form of this category has not been paid attention. Considering the concept of "land management process", its place and role in the system of social relations, emphasis will be placed on the concept of a broad understanding of the legal process, the problem of which exists for decades.Thus, the legal process is a regulated by the procedural rules procedure for the activities of competent state bodies, consisting of the preparation, adoption and documentary consolidation of legal decisions of a general and individual nature. In the land law, the category "process" is specific and serves to designate relationships that provide regulatory and security land-property relationships. Particularly difficult today is the question of the delimitation of the concepts of "process" and "procedure" in general. Regarding

  9. Product Configuration Systems - Implications for Product Innovation and Development

    DEFF Research Database (Denmark)

    Edwards, Kasper; Pedersen, Jørgen Lindgaard

    2004-01-01

    configurations. However, costs are but one parameter on which firms compete and firms must continually innovate new and develop existing products. This paper presents original empirical insights on implementation and use of product configuration systems in a number of Danish industrial firms. The paper discusses...... the organisational changes associated with PCS and how this affects product innovation and development. The paper begins by introducing product configuration systems, which are then placed in context to the firm as a process technology which coordinate different processes: product development, order acquisition......Product Configuration Systems (PCS) is a step in the direction of mass customization in the sense that PCS allows a firm to significantly lower the unit cost of configuration. Thus PCS is a valuable technology for lowering operating costs while retaining a high number of possible product...

  10. Superconductor-normal metal-superconductor process development for the fabrication of small Josephson junctions in ramp type configuration

    International Nuclear Information System (INIS)

    Poepel, R.; Hagedorn, D.; Weimann, T.; Buchholz, F.-I.; Niemeyer, J.

    2000-01-01

    At PTB, a fabrication process has been developed in SNS Nb/PdAu/Nb technology for the verification of small Josephson junctions (JJs) in the deep sub-micron range to enable the implementation of JJs as active elements in highly integrated superconducting circuits. Two steps of this technological development are described with regard to appropriately designed circuit layouts of JJ series arrays (JJAs), the first one in a conventional window type junction (WTJ) configuration and the second one in a ramp type junction (RTJ) configuration. Test circuits of JJAs containing up to 10 000 JJs have been fabricated and experimentally tested. In WTJ configuration, the circuits proved to be sensitive to external perturbing effects affecting the stability of circuit operation. In contrast to that, in RTJ configuration, the circuits realized showed correct function and a high grade of reliability of operation. To produce RTJ circuits, the technology parameters have been set to realize JJs with contact areas of A=0.25μmx1.3μm. At a thickness of the PdAu normal metal layer of d = 40 nm, the values achieved for the critical current density and for the product of critical current and normal state resistance are about j c = 200 k Acm -2 and about I c R N = 21 μV. (author)

  11. Risk-based configuration control: Application of PSA in improving technical specifications and operational safety

    International Nuclear Information System (INIS)

    Samanta, P.K.; Kim, I.S.; Vesely, W.E.

    1992-01-01

    Risk-based configuration control is the management of component configurations using a risk perspective to control risk and assure safety. A configuration, as used here, is a set of component operability statuses that define the state of a nuclear power plant. If the component configurations that have high risk implications do not occur, then the risk from the operation of nuclear power plants would be minimal. The control of component configurations, i.e., the management of component statuses, to minimize the risk from components being unavailable, becomes difficult, because the status of a standby safety system component is often not apparent unless it is tested. Controlling plant configuration from a risk-perspective can provide more direct risk control and also more operational flexibility by allowing looser controls in areas unimportant to risk. Risk-based configuration control approaches can be used to replace parts of nuclear power plant Technical Specifications. With the advances in probabilistic safety assessment (PSA) technology, such approaches to improve Technical Specifications and operational safety are feasible. In this paper, we present an analysis of configuration risks, and a framework for risk-based configuration control to achieve the desired control of risk-significant configurations during plant operation

  12. Verification and validation process for the safety software in KNICS

    International Nuclear Information System (INIS)

    Kwon, Kee-Choon; Lee, Jang-Soo; Kim, Jang-Yeol

    2004-01-01

    This paper describes the Verification and Validation (V and V ) process for safety software of Programmable Logic Controller (PLC), Digital Reactor Protection System (DRPS), and Engineered Safety Feature-Component Control System (ESF-CCS) that are being developed in Korea Nuclear Instrumentation and Control System (KNICS) projects. Specifically, it presents DRPS V and V experience according to the software development life cycle. The main activities of DRPS V and V process are preparation of software planning documentation, verification of Software Requirement Specification (SRS), Software Design Specification (SDS) and codes, and testing of the integrated software and the integrated system. In addition, they include software safety analysis and software configuration management. SRS V and V of DRPS are technical evaluation, licensing suitability evaluation, inspection and traceability analysis, formal verification, preparing integrated system test plan, software safety analysis, and software configuration management. Also, SDS V and V of RPS are technical evaluation, licensing suitability evaluation, inspection and traceability analysis, formal verification, preparing integrated software test plan, software safety analysis, and software configuration management. The code V and V of DRPS are traceability analysis, source code inspection, test case and test procedure generation, software safety analysis, and software configuration management. Testing is the major V and V activity of software integration and system integration phase. Software safety analysis at SRS phase uses Hazard Operability (HAZOP) method, at SDS phase it uses HAZOP and Fault Tree Analysis (FTA), and at implementation phase it uses FTA. Finally, software configuration management is performed using Nu-SCM (Nuclear Software Configuration Management) tool developed by KNICS project. Through these activities, we believe we can achieve the functionality, performance, reliability and safety that are V

  13. Self Configurable Intelligent Distributed Antenna System

    DEFF Research Database (Denmark)

    Kumar, Ambuj; Mihovska, Albena Dimitrova; Prasad, Ramjee

    2016-01-01

    with their respective base stations, spectrum pooling and management at antenna end is not efficient. The situation worsens in Heterogeneous and Dense-net conditions in an Area of Interest (AoI). In this paper, we propose a DAS based intelligent architecture referred to as Self Configurable Intelligent Distributed...

  14. Design and Data Management System

    Science.gov (United States)

    Messer, Elizabeth; Messer, Brad; Carter, Judy; Singletary, Todd; Albasini, Colby; Smith, Tammy

    2007-01-01

    The Design and Data Management System (DDMS) was developed to automate the NASA Engineering Order (EO) and Engineering Change Request (ECR) processes at the Propulsion Test Facilities at Stennis Space Center for efficient and effective Configuration Management (CM). Prior to the development of DDMS, the CM system was a manual, paper-based system that required an EO or ECR submitter to walk the changes through the acceptance process to obtain necessary approval signatures. This approval process could take up to two weeks, and was subject to a variety of human errors. The process also requires that the CM office make copies and distribute them to the Configuration Control Board members for review prior to meetings. At any point, there was a potential for an error or loss of the change records, meaning the configuration of record was not accurate. The new Web-based DDMS eliminates unnecessary copies, reduces the time needed to distribute the paperwork, reduces time to gain the necessary signatures, and prevents the variety of errors inherent in the previous manual system. After implementation of the DDMS, all EOs and ECRs can be automatically checked prior to submittal to ensure that the documentation is complete and accurate. Much of the configuration information can be documented in the DDMS through pull-down forms to ensure consistent entries by the engineers and technicians in the field. The software also can electronically route the documents through the signature process to obtain the necessary approvals needed for work authorization. The workflow of the system allows for backups and timestamps that determine the correct routing and completion of all required authorizations in a more timely manner, as well as assuring the quality and accuracy of the configuration documents.

  15. 49 CFR 659.31 - Hazard management process.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Hazard management process. 659.31 Section 659.31... Agency § 659.31 Hazard management process. (a) The oversight agency must require the rail transit agency..., operational changes, or other changes within the rail transit environment. (b) The hazard management process...

  16. Nash Game Model for Optimizing Market Strategies, Configuration of Platform Products in a Vendor Managed Inventory (VMI) Supply Chain for a Product Family

    NARCIS (Netherlands)

    Y. Yu (Yugang); G.Q. Huang (George)

    2009-01-01

    textabstractThis paper discusses how a manufacturer and its retailers interact with each other to optimize their product marketing strategies, platform product configuration and inventory policies in a VMI (Vendor Managed Inventory) supply chain. The manufacturer procures raw materials from multiple

  17. A combined disease management and process modeling approach for assessing and improving care processes: a fall management case-study.

    Science.gov (United States)

    Askari, Marjan; Westerhof, Richard; Eslami, Saied; Medlock, Stephanie; de Rooij, Sophia E; Abu-Hanna, Ameen

    2013-10-01

    To propose a combined disease management and process modeling approach for evaluating and improving care processes, and demonstrate its usability and usefulness in a real-world fall management case study. We identified essential disease management related concepts and mapped them into explicit questions meant to expose areas for improvement in the respective care processes. We applied the disease management oriented questions to a process model of a comprehensive real world fall prevention and treatment program covering primary and secondary care. We relied on interviews and observations to complete the process models, which were captured in UML activity diagrams. A preliminary evaluation of the usability of our approach by gauging the experience of the modeler and an external validator was conducted, and the usefulness of the method was evaluated by gathering feedback from stakeholders at an invitational conference of 75 attendees. The process model of the fall management program was organized around the clinical tasks of case finding, risk profiling, decision making, coordination and interventions. Applying the disease management questions to the process models exposed weaknesses in the process including: absence of program ownership, under-detection of falls in primary care, and lack of efficient communication among stakeholders due to missing awareness about other stakeholders' workflow. The modelers experienced the approach as usable and the attendees of the invitational conference found the analysis results to be valid. The proposed disease management view of process modeling was usable and useful for systematically identifying areas of improvement in a fall management program. Although specifically applied to fall management, we believe our case study is characteristic of various disease management settings, suggesting the wider applicability of the approach. Copyright © 2013 Elsevier Ireland Ltd. All rights reserved.

  18. APIs for QoS configuration in Software Defined Networks

    DEFF Research Database (Denmark)

    Caba, Cosmin Marius; Soler, José

    2015-01-01

    The OpenFlow (OF) protocol is widely used in Software Defined Networking (SDN) to realize the communication between the controller and forwarding devices. OF allows great flexibility in managing traffic flows. However, OF alone is not enough to build more complex SDN services that require complete...... such as configuration of devices, ports, queues, etc. An Application Programming Interface (API) for dynamic configuration of QoS resources in the network devices is implemented herein, by using the capabilities of OVSDB. Further, the paper demonstrates the possibility to create network services with coarse granularity...... on top of the fine granular services exposed by the QoS configuration API at the SDNC. A series of tests emphasize the capabilities and the performance of the implemented QoS configuration API....

  19. A CMake-based build and configuration framework

    CERN Multimedia

    CERN. Geneva

    2012-01-01

    The LHCb experiment has been using the CMT build and configuration tool for its software since the first versions, mainly because of its multi-platform build support and its powerful configuration management functionality. Still, CMT has some limitations in terms of build performance and the increased complexity added to the tool to cope with new use cases added latterly. Therefore, we have been looking for a viable alternative to it and we have investigated the possibility of adopting the CMake tool, which does a very good job for building and is getting very popular in the HEP community. The result of this study is a CMake-based framework which provides most of the special configuration features available natively only in CMT, with the advantages of better performances, flexibility and portability.

  20. Configuring Symantec AntiVirus

    CERN Document Server

    Shimonski, Robert

    2003-01-01

    This is the only book that will teach system administrators how to configure, deploy, and troubleshoot Symantec Enterprise Edition in an enterprise network. The book will reflect Symantec''s philosophy of "Centralized Antivirus Management." For the same reasons that Symantec bundled together these previously separate products, the book will provide system administrators with a holistic approach to defending their networks from malicious viruses. This book will also serve as a Study Guide for those pursuing Symantec Product Specialist Certifications.Configuring Symantec AntiVirus Enterprise Edition contains step-by-step instructions on how to Design, implement and leverage the Symantec Suite of products in the enterprise.ØFirst book published on market leading product and fast-growing certification. Despite the popularity of Symantec''s products and Symantec Product Specialist certifications, there are no other books published or announced.ØLess expensive substitute for costly on-sight training. Symantec off...

  1. An approach for the development of visual configuration systems

    DEFF Research Database (Denmark)

    Hvam, Lars; Ladeby, Klaes Rohde

    2007-01-01

    How can a visual configuration system be developed to support the specification process' in companies that manufacture customer tailored products? This article focuses on how visual configuration systems can be developed. The approach for developing visual configuration systems has been developed...... by Centre for Product Modelling (CPM) at The Technical University of Denmark. The approach is based on experiences from a visualization project in co-operation between CPM and the global provider of power protection American Power Conversion (APC). The visual configuration system was developed in 2001...... of the product in the visual configuration system....

  2. Managing the training process in bodybuilding

    OpenAIRE

    Netík, Tomáš

    2011-01-01

    Anotation Title: Managing the training process in bodybuilding This thesis describes the sport of bodybuilding and its training process. It also describes aspects of managing the training process and based on own research determines what impact the training process is applied to changes in the state of training and performance. There is also considering the impact of specific training methods and intensification. In the research of this thesis, we used different testing methods. We performed ...

  3. Configuring the development space for conceptualization

    DEFF Research Database (Denmark)

    Brønnum, Louise; Clausen, Christian

    2013-01-01

    This paper addresses issues of conceptualization in the early stages of concept development noted as the Front End of Innovation [FEI]. We examine this particular development space as a socio technical space where a diversity of technological knowledge, user perspectives and organizational agendas...... meet and interact. Based on a case study from an industrial medical company, the paper addresses and analyses the configuration of the development space in a number of projects aiming to take up user oriented perspectives in their activities. It presents insights on how the FEI was orchestrated...... and staged and how different elements and objects contributed to the configuration of the space in order to make it perform in a certain way. The analysis points at the importance of the configuration processes and indicate how these configurations often may act as more or less hidden limitations on concept...

  4. Moderator Configuration Options for ESS

    DEFF Research Database (Denmark)

    Zanini, L.; Batkov, K.; Klinkby, Esben Bryndt

    2016-01-01

    The current, still evolving status of the design and the optimization work for the moderator configuration for the European Spallation Source is described. The moderator design has been strongly driven by the low-dimensional moderator concept recently proposed for use in spallation neutron sources...... or reactors. Quasi-two dimensional, disc- or tube-shaped moderators,can provide strong brightness increase (factor of 3 or more) with respect to volume para-H2moderators, which constitute the reference, state-of-the-art technology for high-intensity coupled moderators. In the design process other, more...... conventional, principles were also considered,such as the importance of moderator positioning, of the premoderator, and beam extraction considerations. Different design and configuration options are evaluated and compared with the reference volume moderator configuration described in the ESS Technical Design...

  5. A Process Management System for Networked Manufacturing

    Science.gov (United States)

    Liu, Tingting; Wang, Huifen; Liu, Linyan

    With the development of computer, communication and network, networked manufacturing has become one of the main manufacturing paradigms in the 21st century. Under the networked manufacturing environment, there exist a large number of cooperative tasks susceptible to alterations, conflicts caused by resources and problems of cost and quality. This increases the complexity of administration. Process management is a technology used to design, enact, control, and analyze networked manufacturing processes. It supports efficient execution, effective management, conflict resolution, cost containment and quality control. In this paper we propose an integrated process management system for networked manufacturing. Requirements of process management are analyzed and architecture of the system is presented. And a process model considering process cost and quality is developed. Finally a case study is provided to explain how the system runs efficiently.

  6. Supporting the full BPM life-cycle using process mining and intelligent redesign

    NARCIS (Netherlands)

    Netjes, M.; Reijers, H.A.; Aalst, van der W.M.P.; Siau, K.

    2007-01-01

    Abstract. Business Process Management (BPM) systems provide a broad range of facilities to enact and manage operational business processes. Ideally, these systems should provide support for the complete BPM life-cycle: (re)design, configuration, execution, control, and diagnosis by the FileNet P8

  7. MCTS Microsoft SharePoint 2010 Configuration Study Guide Exam 70-667

    CERN Document Server

    Pyles, James

    2010-01-01

    A Sybex study guide for the new SharePoint Server 2010 Configuration examSharePoint holds 55 percent of the collaboration and content management market, with many more companies indicating they plan to join the fold. IT professionals interested in enhancing their marketability with the new Microsoft Certified Technology Specialist: Microsoft SharePoint Server 2010 Configuring exam will find this guide may be their only alternative to costly classroom training.Microsoft SharePoint claims over half the market for collaboration and content management software; IT professionals will boost their ma

  8. Technologies for Collaborative Business Process Management

    NARCIS (Netherlands)

    Sadiq, Shazia; Reichert, M.U.; Schulz, Karsten

    Business process management (BPM) has become an extensive area of research with several specialized aspects. BPM is viewed from highly diverse angles ranging from a management strategy to a software system. It is widely acknowledged that process enforcement technologies hold the potential to provide

  9. Study on Resource Configuration on Cloud Manufacturing

    Directory of Open Access Journals (Sweden)

    Yanlong Cao

    2015-01-01

    Full Text Available The purpose of manufacturing is to realize the requirement of customer. In manufacturing process of cloud system, there exist a lot of resource services which have similar functional characteristics to realize the requirement. It makes the manufacturing process more diverse. To develop the quality and reduce cost, a resource configuration model on cloud-manufacturing platform is put forward in this paper. According to the generalized six-point location principle, a growth design from the requirement of customers to entities with geometric constraints is proposed. By the requirement growing up to product, a configuration process is used to match the entities with the instances which the resources in the database could supply. Different from most existing studies, this paper studies the tolerance design with multiple candidate resource suppliers on cloud manufacturing to make the market play a two-level game considering the benefit of customers and the profit of resources to give an optimal result. A numerical case study is used to illustrate the proposed model and configuration process. The performance and advantage of the proposed method are discussed at the end.

  10. The Design and Analysis of Virtual Network Configuration for a Wireless Mobile ATM Network

    OpenAIRE

    Bush, Stephen F.

    1999-01-01

    This research concentrates on the design and analysis of an algorithm referred to as Virtual Network Configuration (VNC) which uses predicted future states of a system for faster network configuration and management. VNC is applied to the configuration of a wireless mobile ATM network. VNC is built on techniques from parallel discrete event simulation merged with constraints from real-time systems and applied to mobile ATM configuration and handoff. Configuration in a mobile network is a dyna...

  11. Investigation of different ethylenediamine-N,N'-disuccinic acid-enhanced washing configurations for remediation of a Cu-contaminated soil: process kinetics and efficiency comparison between single-stage and multi-stage configurations.

    Science.gov (United States)

    Ferraro, Alberto; Fabbricino, Massimiliano; van Hullebusch, Eric D; Esposito, Giovanni

    2017-09-01

    A comparison of Cu extraction yields for three different ethylenediamine-N,N'-disuccinic acid (EDDS)-enhanced washing configurations was performed on a Cu-contaminated soil. Batch experiments were used to simulate a single-stage continuous stirred tank reactor (CSTR) and a multi-stage (side feeding and counter-current) reactor. Single-stage CSTR conditions were simulated for various EDDS:(Cu + Cd + Pb + Co + Ni + Zn) molar ratio (EDDS:M ratio) (from 1 to 30) and liquid to soil (L/S) ratio (from 15 to 45). The highest Cu extraction yield (≃56%) was achieved with EDDS:M = 30. In contrast, a Cu extraction yield decrease was observed with increasing L/S ratio with highest extracted Cu achievement (≃48%) for L/S = 15. Side feeding configuration was tested in four experimental conditions through different fractionation mode of EDDS dose and treatment time at each washing step. Results from the four tests showed all enhanced Cu extraction (maximum values from ≃43 to ≃51%) achieved at lower treatment time and lower EDDS:M molar ratio compared to CSTR configuration with L/S = 25 and EDDS:M = 10. The counter-current washing was carried out through two washing flows achieving a process performance enhancement with 27% increase of extracted Cu compared to single-stage CSTR configuration. Higher Cu extraction percentage (36.8%) was observed in the first washing phase than in the second one (24.7%).

  12. Effects of spatial configuration of imperviousness and green infrastructure networks on hydrologic response in a residential sewershed

    Science.gov (United States)

    Lim, Theodore C.; Welty, Claire

    2017-09-01

    Green infrastructure (GI) is an approach to stormwater management that promotes natural processes of infiltration and evapotranspiration, reducing surface runoff to conventional stormwater drainage infrastructure. As more urban areas incorporate GI into their stormwater management plans, greater understanding is needed on the effects of spatial configuration of GI networks on hydrological performance, especially in the context of potential subsurface and lateral interactions between distributed facilities. In this research, we apply a three-dimensional, coupled surface-subsurface, land-atmosphere model, ParFlow.CLM, to a residential urban sewershed in Washington DC that was retrofitted with a network of GI installations between 2009 and 2015. The model was used to test nine additional GI and imperviousness spatial network configurations for the site and was compared with monitored pipe-flow data. Results from the simulations show that GI located in higher flow-accumulation areas of the site intercepted more surface runoff, even during wetter and multiday events. However, a comparison of the differences between scenarios and levels of variation and noise in monitored data suggests that the differences would only be detectable between the most and least optimal GI/imperviousness configurations.

  13. Conceptualizing Embedded Configuration

    DEFF Research Database (Denmark)

    Oddsson, Gudmundur Valur; Hvam, Lars; Lysgaard, Ole

    2006-01-01

    and services. The general idea can be named embedded configuration. In this article we intend to conceptualize embedded configuration, what it is and is not. The difference between embedded configuration, sales configuration and embedded software is explained. We will look at what is needed to make embedded...... configuration systems. That will include requirements to product modelling techniques. An example with consumer electronics will illuminate the elements of embedded configuration in settings that most can relate to. The question of where embedded configuration would be relevant is discussed, and the current...

  14. Engineering Analysis of Intermediate Loop and Process Heat Exchanger Requirements to Include Configuration Analysis and Materials Needs

    Energy Technology Data Exchange (ETDEWEB)

    T.M. Lillo; R.L. Williamson; T.R. Reed; C.B. Davis; D.M. Ginosar

    2005-09-01

    The need to locate advanced hydrogen production facilities a finite distance away from a nuclear power source necessitates the need for an intermediate heat transport loop (IHTL). This IHTL must not only efficiently transport energy over distances up to 500 meters but must also be capable of operating at high temperatures (>850oC) for many years. High temperature, long term operation raises concerns of material strength, creep resistance and general material stability (corrosion resistance). IHTL design is currently in the initial stages. Many questions remain to be answered before intelligent design can begin. The report begins to look at some of the issues surrounding the main components of an IHTL. Specifically, a stress analysis of a compact heat exchanger design under expected operating conditions is reported. Also the results of a thermal analysis performed on two ITHL pipe configurations for different heat transport fluids are presented. The configurations consist of separate hot supply and cold return legs as well as annular design in which the hot fluid is carried in an inner pipe and the cold return fluids travels in the opposite direction in the annular space around the hot pipe. The effects of insulation configurations on pipe configuration performance are also reported. Finally, a simple analysis of two different process heat exchanger designs, one a tube in shell type and the other a compact or microchannel reactor are evaluated in light of catalyst requirements. Important insights into the critical areas of research and development are gained from these analyses, guiding the direction of future areas of research.

  15. An Interaction Measure for Control Configuration Selection for Multivariable Bilinear Systems

    DEFF Research Database (Denmark)

    Shaker, Hamid Reza; Stoustrup, Jakob

    2013-01-01

    are needed to be controlled, are nonlinear and linear models are insufficient to describe the behavior of the processes. The focus of this paper is on the problem of control configuration selection for a class of nonlinear systems which is known as bilinear systems. A gramian-based interaction measure...... for control configuration selection of MIMO bilinear processes is described. In general, most of the results on the control configuration selection, which have been proposed so far, can only support linear systems. The proposed gramian-based interaction measure not only supports bilinear processes but also...

  16. 77 FR 30517 - Electricity Subsector Cybersecurity Risk Management Process

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process AGENCY: Office of... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk... Management Process. The primary goal of this guideline is to describe a risk management process that is...

  17. Air Quality Management Process Cycle

    Science.gov (United States)

    Air quality management are activities a regulatory authority undertakes to protect human health and the environment from the harmful effects of air pollution. The process of managing air quality can be illustrated as a cycle of inter-related elements.

  18. A new approach in Business Process Management

    OpenAIRE

    Hurbean, Luminita

    2008-01-01

    The new wave of BPM (Business Process Management) is not Business Process Reenginering, enterprise application integration, workflow management or another packaged application – it's the synthesis and extension of all these technologies and techniques into a unified whole. This unified whole becomes a new foundation upon which the enterprise is built, an enterprise more in tune with the true nature of business processes and their management. In a competitive economy, where margins continu...

  19. System of business-processes management at motor-transport enterprise

    OpenAIRE

    Коgut, Y.

    2010-01-01

    The place of the system of business-processes management at motor-transport enterprise in the general system of management of the enterprise has been substantiated. The subsystems of strategic management, business-processes management of strategic orientation and current activity, processes of enterprise functioning management have been marked out. The system of motor-transport enterprise business-processes management has been formed, which, unlike the existing ones, is based on the system-cy...

  20. Method for Business Process Management System Selection

    NARCIS (Netherlands)

    Thijs van de Westelaken; Bas Terwee; Pascal Ravesteijn

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However

  1. Business process of reputation management of food industry enterprises

    Directory of Open Access Journals (Sweden)

    Derevianko Olena. H.

    2014-01-01

    Full Text Available The goal of the article is development of the methodical base of reputation management directed at formalisation of theoretical provisions and explanation how to organise reputation management at food industry enterprises. The article shows prospectiveness of use of the Business Process Management concept in reputation management. Using the diagram of the Reputation Management business process environment the article shows its key participants (suppliers and clients of the business process and identifies their place in formation of the enterprise reputation. It also shows that the reputation management should be considered a business process of the highest level of management. Construction of the flow structure of the Reputation Management business process allows uncovering the logic of interrelation of inlets and outlets within the framework of the specified main stages of the business process: assessment of the current state of reputation, collection of information about stakeholders, identification of PR strategy goals, planning of necessary resources, realisation of the PR strategy, assessment of efficiency and process monitoring. The article offers the flow, functional and organisational structures of the Reputation Management business process for food industry enterprises. Moreover, justification of functional and organisational structures of the Reputation Management business process gives a possibility to distribute functions of reputation management between specific executors and establish responsibility for each stage of the business process.

  2. CASE-BASED PRODUCT CONFIGURATION AND REUSE IN MASS CUSTOMIZATION

    Institute of Scientific and Technical Information of China (English)

    Wang Shiwei; Tan Jianrong; Zhang Shuyou; Wang Xin; He Chenqi

    2004-01-01

    The increasing complexity and size of configuration knowledge bases requires the provision of advanced methods supporting the development of the actual configuration process and design reuse.A new framework to find a feasible and practical product configuration method is presented in mass customization.The basic idea of the approach is to integrate case-based reasoning (CBR) with a constraint satisfaction problem(CSP).The similarity measure between a crisp and range is also given,which is common in case retrieves.Based on the configuration model,a product platform and customer needs,case adaptation is carried out with the repair-based algorithm.Lastly,the methodology in the elevator configuration design domain is tested.

  3. Knowledge management: processes and systems | Igbinovia ...

    African Journals Online (AJOL)

    Knowledge management: processes and systems. ... Information Impact: Journal of Information and Knowledge Management ... observation, role reversal technique, and discussion forums as well as the forms of knowledge representation to include report writing, database management system and institutional repositories.

  4. LHCb: A CMake-based build and configuration framework

    CERN Multimedia

    Clemencic, M; Mato, P

    2011-01-01

    The LHCb experiment has been using the CMT build and configuration tool for its software since the first versions, mainly because of its multi-platform build support and its powerful configuration management functionality. Still, CMT has some limitations in terms of build performance and the increased complexity added to the tool to cope with new use cases added latterly. Therefore, we have been looking for a viable alternative to it and we have investigated the possibility of adopting the CMake tool, which does a very good job for building and is getting very popular in the HEP community. The result of this study is a CMake-based framework which provides most of the special configuration features available natively only in CMT, with the advantages of better performances, flexibility and portability.

  5. A portfolio management system in the strategic management process

    Directory of Open Access Journals (Sweden)

    Qifan Huang

    2017-02-01

    Full Text Available Strategic management is the process of “what we are” which decides and implements “what we intend to be and how we are going to get there.” Strategy describes how an organization intends to compete with the resource available in the existing and perceived future environment. “Project management” is ancient, but also emerging. The wise human ancestors left numerous miracles with us, project management is a branch of the discipline of management, including the pyramids, statues of Zeus, Lighthouse of Alexandria, etc., which are brilliant pages in the history of project management. A project is a plan to solve the problem and effectively complete the established goal of the projects, so you have to go on strategic management for the project. Policy management is the means to achieve its objectives, including planning, implementation and control process. Strategic management is to gather staffs with different functions and form the project team. Due to its properties with a variety of different functions, more flexible management of property strategy in accordance with its special functions should be made in response to the changing internal and external environment. Management of functions is the role and performance management. It is not crime and punishment, but sparse and guide. Instead of the occurrence and discovery of issues, the difficulty is finding the solutions to problems by observations and recommendations. The management functions need to recognize their own responsibilities, and help the company to have a more long-term development of rational thinking.

  6. Configuration monitoring tool for large-scale distributed computing

    International Nuclear Information System (INIS)

    Wu, Y.; Graham, G.; Lu, X.; Afaq, A.; Kim, B.J.; Fisk, I.

    2004-01-01

    The Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) at CERN will likely use a grid system to achieve much of its offline processing need. Given the heterogeneous and dynamic nature of grid systems, it is desirable to have in place a configuration monitor. The configuration monitoring tool is built using the Globus toolkit and web services. It consists of an information provider for the Globus MDS, a relational database for keeping track of the current and old configurations, and client interfaces to query and administer the configuration system. The Grid Security Infrastructure (GSI), together with EDG Java Security packages, are used for secure authentication and transparent access to the configuration information across the CMS grid. This work has been prototyped and tested using US-CMS grid resources

  7. Configuration monitoring tool for large-scale distributed computing

    CERN Document Server

    Wu, Y; Fisk, I; Graham, G; Kim, B J; Lü, X

    2004-01-01

    The Compact Muon Solenoid (CMS) experiment at the Large Hadron Collider (LHC) at CERN will likely use a grid system to achieve much of its offline processing need. Given the heterogeneous and dynamic nature of grid systems, it is desirable to have in place a configuration monitor. The configuration monitoring tool is built using the Globus toolkit and web services. It consists of an information provider for the Globus MDS, a relational database for keeping track of the current and old configurations, and client interfaces to query and administer the configuration system. The Grid Security Infrastructure (GSI), together with EDG Java Security packages, are used for secure authentication and transparent access to the configuration information across the CMS grid. This work has been prototyped and tested using US-CMS grid resources.

  8. Configurating computer-controlled bar system

    OpenAIRE

    Šuštaršič, Nejc

    2010-01-01

    The principal goal of my diploma thesis is creating an application for configurating computer-controlled beverages dispensing systems. In the preamble of my thesis I present the theoretical platform for point of sale systems and beverages dispensing systems, which are required for the understanding of the target problematics. As with many other fields, computer tehnologies entered the field of managing bars and restaurants quite some time ago. Basic components of every bar or restaurant a...

  9. Configurations of self-identity formations of adults who stutter

    Directory of Open Access Journals (Sweden)

    Harsha Kathard

    2010-12-01

    Full Text Available The aims of this paper are twofold: Firstly, to describe the configuration of self-identity formations evident across and within research stories of adults living with stuttering; and secondly, to discuss the clinical implications of these findings. The study on which this paper is based used life history narratives to describe the types, processes and configurations of self-identity formations of adults who stuttered since childhood. Through open-ended, in-depth interviews 7 participants shared their experiences of living with stuttering. The interviews were analysed at a first level using narrative analysis and at a second level to further describe the types, processes and configurations of self-identity formations evident in the stories. The findings on configurations of self-identity formations were that the two types of self-identity formations Able and DisOther were present in singular and dual configurations. The dual self-identity formations occurred in co-existing, competing and coalescing relationships within particular time periods in their stories. The clinical implications of the findings are discussed.

  10. Dynamic behavior of the intensified alternative configurations for quaternary distillation

    DEFF Research Database (Denmark)

    Ramirez-Marquez, Cesar; Cabrera-Ruiz, Julián; Juan Gabriel Segovia-Hernandez, Juan Gabriel

    2016-01-01

    Process intensification emerges as an important tool in the synthesis of multicomponent distillation configurations aimed at the reduction of the energy use and capital costs. Operational and fixed costs savings coupled with simplicity and controllability design configurations appear as an essent......Process intensification emerges as an important tool in the synthesis of multicomponent distillation configurations aimed at the reduction of the energy use and capital costs. Operational and fixed costs savings coupled with simplicity and controllability design configurations appear...... value decomposition technique in all frequency domain. In order to complete the control study, the distillation schemes were subjected to closed-loop dynamic simulations. The results show that there are cases in which the intensified sequences do not only provide energy savings, but also may offer...

  11. NEW PERSPECTIVES ON STRATEGIC MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    POP Zenovia Cristiana

    2013-07-01

    Full Text Available For developing economies the development of enterprises should be a strategic goal, this way of thinking may become viable only as a result of a combination of judicious analysis based on specific local economic aspects and a set of actions to correct any slippage or amplify existing development trends taken by the managers. A better leadership would unequivocally lead to a better strategy but sometimes the lack of information, first about the external environment, continuously undergoing quick and radical changes, the political problems and the complexity of the implementation of the strategy or the costs that it implies are not taken into consideration. Therefore managers have two options: to establish strategies, which would lead to the achievement of the objectives; evaluate them on the basis of economic efficiency or to identify an already existent strategy and to adapt it to the environment changes in which the enterprise carries on its activity. This paper aims at discussing and explaining from a theoretical perspective, the evolution and the advantages and disadvantages of the strategic management process, in order to convey the managers a modality to achieve competitiveness and evaluate the position of the firm. In the first section, we explain the the necessity of strategic management process. In the second section we present the different evolution stages. The third section presents our conclusions regarding the advantages and disadvantages of the strategic management process, fundamental for the strategy success. The financial crisis did affect the Romanian economy and Romanian enterprises early in 2009 registering an impact of the crisis identified in the need of the managers to rethink their strategies, to improve their management skills and perspectives on the role of the employees after the crisis. In this paper we try to underline the evolution stages of the strategic management process with its own characteristics by which both

  12. An XML-based configuration system for MAST PCS

    International Nuclear Information System (INIS)

    Storrs, J.; McArdle, G.

    2008-01-01

    MAST PCS, a port of General Atomics' generic Plasma Control System, is a large software system comprising many source files in C and IDL. Application parameters can affect multiple source files in complex ways, making code development and maintenance difficult. The MAST PCS configuration system aims to make the task of the application developer easier, through the use of XML-based configuration files and a configuration tool which processes them. It is presented here as an example of a useful technique with wide application

  13. Effects of background neutral particles on a field-reversed configuration plasma in the translation process

    International Nuclear Information System (INIS)

    Matsuzawa, Yoshiki; Asai, Tomohiko; Takahashi, Tsutomu; Takahashi, Toshiki

    2008-01-01

    A field-reversed configuration (FRC) plasma was translated into a weakly ionized plasma and the effects of heating and particle buildup of the FRC plasma due to the background neutral particles and plasma injection in the translation process were investigated. Improvement of the particle and poloidal flux confinements and delay of onset of n=2 rotational instability were observed in the translation process. It was found that the internal structure of the plasma pressure (plasma temperature and density) at the separatrix and field null was deformed by the particle injection. FRC plasma translation through the background particles was equivalent to an end-on particle beam injection to the FRC plasma. Particles and energy were supplied during the translation. The results obtained for the phenomena of particle supply and plasma heating were also supported by the results of two-dimensional particle simulation. The effects of background particle injection appear to be a promising process for the regeneration of translation kinetic energy to plasma internal energy

  14. Management of Organizational Change Processes

    Directory of Open Access Journals (Sweden)

    Vladimir-Codrin Ionescu

    2015-12-01

    Full Text Available Contemporary organizations need to understand the meaning of change and to tackle it as a source for improving processes and activities, aiming at increasing the performance and competitiveness. From this perspective, the paper presents approaches to organizational change and highlights the fundamental objectives which the organizations set for themselves by designing and implementing organizational change programs. The conceptual framework of the change management is defined and the stages of the change management process are presented. In the final part of the paper the problem of resistance to change is highlighted by explaining the content of the stages that employees go through in the process of adapting to change within organizations

  15. "It's All about Standardisation"--Exploring the Digital (Re)Configuration of School Management and Administration

    Science.gov (United States)

    Selwyn, Neil

    2011-01-01

    Schools have long made use of digital technologies to support the co-ordination of management and administrative processes--not least "management information systems", "virtual learning environments" and other "institutional technologies". The last five years have seen the convergence of these technologies into…

  16. Management by process based systems and safety focus

    International Nuclear Information System (INIS)

    Rydnert, Bo; Groenlund, Bjoern

    2005-12-01

    An initiative from The Swedish Nuclear Power Inspectorate led to this study carried out in the late autumn of 2005. The objective was to understand in more detail how an increasing use of process management affects organisations, on the one hand regarding risks and security, on the other hand regarding management by objectives and other management and operative effects. The main method was interviewing representatives of companies and independent experts. More than 20 interviews were carried out. In addition a literature study was made. All participating companies are using Management Systems based on processes. However, the methods chosen, and the results achieved, vary extensively. Thus, there are surprisingly few examples of complete and effective management by processes. Yet there is no doubt that management by processes is effective and efficient. Overall goals are reached, business results are achieved in more reliable ways and customers are more satisfied. The weaknesses found can be translated into a few comprehensive recommendations. A clear, structured and acknowledged model should be used and the processes should be described unambiguously. The changed management roles should be described and obeyed extremely legibly. New types of process objectives need to be formulated. In addition one fact needs to be observed and effectively fended off. Changes are often met by mental opposition on management level, as well as among co-workers. This fact needs attention and leadership. Safety development is closely related to the design and operation of a business management system and its continual improvement. A deep understanding of what constitutes an efficient and effective management system affects the understanding of safety. safety culture and abilities to achieve safety goals. Concerning risk, the opinions were unambiguous. Management by processes as such does not result in any further risks. On the contrary. Processes give a clear view of production and

  17. Knowledge Management Enablers and Process in Hospital Organizations.

    Science.gov (United States)

    Lee, Hyun-Sook

    2017-02-01

    This research aimed to investigate the effects of knowledge management enablers, such as organizational structure, leadership, learning, information technology systems, trust, and collaboration, on the knowledge management process of creation, storage, sharing, and application. Using data from self-administered questionnaires in four Korean tertiary hospitals, this survey investigated the main organizational factors affecting the knowledge management process in these organizations. A total of 779 questionnaires were analyzed using SPSS 18.0 and AMOS 18.0. The results showed that organizational factors affect the knowledge management process differently in each hospital organization. From a managerial perspective, the implications of these factors for developing organizational strategies that encourage and foster the knowledge management process are discussed.

  18. Using a Configuration System to Design Toilets and Place Installation Shafts

    DEFF Research Database (Denmark)

    Kudsk, Anders; Hvam, Lars; Thuesen, Christian Langhoff

    2013-01-01

    The aim of this research is to discover how configuration systems can support a product's design process when a high degree of variation is required and a very open or endless space exists for possible configurations. The article is based on an industrial case involving a firm that wishes to offer...... of opportunities exist for using configuration systems in the construction industry. They also show that it can be done without fundamentally changing the present process. © Kudsk et al.; Licensee Bentham Open....

  19. Performance evaluation of extractor cutting blade configuration in Inulin extraction process from Dahlia sp. L tuber

    Science.gov (United States)

    Sundari, E.; Praputri, E.; Marthiana, W.; Jaya, M.

    2018-03-01

    Inulin, a polysaccharide plant-based nutrient, can be isolated from dahlia flower tubers by liquid-solid extraction processes and is generally carried out in an extractor tank equipped with an agitator. To accelerate the diffusion rate of solute from the solid phase (bulk phase) to the external surface (boundary layer) in order to increase yield of inulin, the size reduction of material is required. The purpose of this research was to design the cutting blade needed for dahlia tuber size reduction and investigate the effect of blade types, agitator speed (350, 700, 1050, and 1400 rpm), and configuration of cutting blade to material fineness at 90 minutes of contacting time. The results showed that higher cutting blade speed results in higher cut material fineness rate. The best conditions was achieved by the configuration of two four-blade turbine combined with one three-blade turbine with fineness rate more than 90% in 30 minutes of contacting time at every variation of agitator speed. The cutting blade designed in this study can be used for size reduction purpose of tubers other than dahlia tubers.

  20. CAVEMAN: Configuration And VErsion MANagement. User`s guide, v2.1.2

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, K.M.

    1993-03-12

    The mission of the CAVEMAN project is to provide the tools for large code systems so that those who work on them can perform source control and configuration control on UNIX-based file servers, rather than the LC Crays. An outside product called cvs has been chosen as the underlying source control system. The initials stand for {open_quotes}Concurrent Versions System{close_quotes}. It is a freeware program that runs on most UNIX stations. To quote from the cvs man page: {open_quotes}cvs is a front end to the rcs revision control system which extends the notion of revision control from a collection of files in a single directory to a hierarchical collection of directories consisting of revision controlled files. These directories and files can be combined together to form a software release. cvs provides the functions necessary to manage these software releases and to control the concurrent editing of source files among multiple software developers.{close_quotes} While cvs may be run directly, there are several tasks in the LLNL environment that it seemed either safer or easier to automate. CAVEMAN provides the needed functionality, generally in the form of wrappers to cvs.

  1. Evaluation of Early Ground Control Station Configurations for Interacting with a UAS Traffic Management (UTM) System

    Science.gov (United States)

    Dao, Arik-Quang V.; Martin, Lynne; Mohlenbrink, Christoph; Bienert, Nancy; Wolte, Cynthia; Gomez, Ashley; Claudatos, Lauren; Mercer, Joey

    2017-01-01

    The purpose of this paper is to report on a human factors evaluation of ground control station design concepts for interacting with an unmanned traffic management system. The data collected for this paper comes from recent field tests for NASA's Unmanned Traffic Management (UTM) project, and covers the following topics; workload, situation awareness, as well as flight crew communication, coordination, and procedures. The goal of this evaluation was to determine if the various software implementations for interacting with the UTM system can be described and classified into design concepts to provide guidance for the development of future UTM interfaces. We begin with a brief description of NASA's UTM project, followed by a description of the test range configuration related to a second development phase. We identified (post hoc) two classes in which the ground control stations could be grouped. This grouping was based on level of display integration. The analysis was exploratory and informal. It was conducted to compare ground stations across those two classes and against the aforementioned topics. Herein, we discuss the results.

  2. Information processing among high-performance managers

    Directory of Open Access Journals (Sweden)

    S.C. Garcia-Santos

    2010-01-01

    Full Text Available The purpose of this study was to evaluate the information processing of 43 business managers with a professional superior performance. The theoretical framework considers three models: the Theory of Managerial Roles of Henry Mintzberg, the Theory of Information Processing, and Process Model Response to Rorschach by John Exner. The participants have been evaluated by Rorschach method. The results show that these managers are able to collect data, evaluate them and establish rankings properly. At same time, they are capable of being objective and accurate in the problems assessment. This information processing style permits an interpretation of the world around on basis of a very personal and characteristic processing way or cognitive style.

  3. Study on a Process-oriented Knowledge Management Model

    OpenAIRE

    Zhang, Lingling; Li, Jun; Zheng, Xiuyu; Li, Xingsen; Shi, Yong

    2007-01-01

    Now knowledge has become the most important resource of enterprises. Process-oriented knowledge management (POKM) is a new and valuable research field. It may be the most practical method to deal with difficulties in knowledge management. The paper analyzes background, hypothesis and proposes of POKM, define the process knowledge, and give a process-oriented knowledge management model. The model integrates knowledge, process, human, and technology. It can improve the decision support capabili...

  4. Survey process quality: a question of healthcare manager approach.

    Science.gov (United States)

    Nilsson, Petra; Blomqvist, Kerstin

    2017-08-14

    Purpose The purpose of this paper is to explore how healthcare first-line managers think about and act regarding workplace survey processes. Design/methodology/approach This interview study was performed at a hospital in south Sweden. First-line healthcare managers ( n=24) volunteered. The analysis was inspired by phenomenography, which aims to describe the ways in which different people experience a phenomenon. The phenomenon was a workplace health promotion (WHP) survey processes. Findings Four main WHP survey process approaches were identified among the managers: as a possibility, as a competition, as a work task among others and as an imposition. For each, three common subcategories emerged; how managers: stated challenges and support from hospital management; described their own work group and collaboration with other managers; and expressed themselves and their situation in their roles as first-line managers. Practical implications Insights into how hospital management can understand their first-line managers' motivation for survey processes and practical suggestions and how managers can work proactively at organizational, group and individual level are presented. Originality/value Usually these studies focus on those who should respond to a survey; not those who should run the survey process. Focusing on managers and not co-workers can lead to more committed and empowered managers and thereby success in survey processes.

  5. REALIZING BUSINESS PROCESS MANAGEMENT BY HELP OF A PROCESS MAPPING DATABASE TOOL

    CERN Document Server

    Vergili, Ceren

    2016-01-01

    In a typical business sector, processes are the building blocks of the achievement. A considerable percentage of the processes are consisting of business processes. This fact is bringing the fact that business sectors are in need of a management discipline. Business Process Management (BPM) is a discipline that combines modelling, automation, execution, control, measurement, and optimization of process by considering enterprise goals, spanning systems, employees, customers, and partners. CERN’s EN – HE – HM section desires to apply the BPM discipline appropriately for improving their necessary technical, administrative and managerial actions to supply appropriate CERN industrial transport, handling and lifting equipment and to maintain it. For this reason, a Process Mapping Database Tool is created to develop a common understanding about how the section members can visualize their processes, agree on quality standards and on how to improve. It provides a management support by establishing Process Charts...

  6. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  7. An intelligent sales assistant for configurable products

    OpenAIRE

    Molina, Martin

    2001-01-01

    Some of the recent proposals of web-based applications are oriented to provide advanced search services through virtual shops. Within this context, this paper proposes an advanced type of software application that simulates how a sales assistant dialogues with a consumer to dynamically configure a product according to particular needs. The paper presents the general knowl- edge model that uses artificial intelligence and knowledge-based techniques to simulate the configuration process. Finall...

  8. Optimization of process parameter and reformer configuration for hydrogen production from steam reforming of heavy hydrocarbons. Paper no. IGEC-1-079

    International Nuclear Information System (INIS)

    Chen, Z.; Elnashaie, S.E.H.

    2005-01-01

    The present optimization investigation is classified into reforming configuration optimization in one hand and parameter optimization of each configuration on the other hand. Heptane is used as a model component for heavy hydrocarbons. The proposed novel reforming process is basically a Circulating Fluidized-Bed Membrane Reformer (CFBMR) with continuous catalyst regeneration and gas-solid separation. Composite hydrogen selective membranes are used for removing the product hydrogen from the reacting gas mixture and therefore driving the reversible reactions beyond their thermodynamic equilibriums. Dense perovskite oxygen selective membranes are also used to introduce oxygen for the exothermic oxidation of hydrocarbons and carbon. Four configurations are investigated, two of them are with the catalyst regeneration before the gas-solid separation and the other two are with the catalyst regeneration after the gas-solid separation. The optimization of the performance of each configuration is carried out for a number of design and operating parameters as optimization parameters and under both non-autothermal and autothermal reforming conditions. Results show that the autothermal operation with direct contact between cold feeds (water and heptane) and hot circulating catalyst can be the best configuration for efficient hydrogen production with minimum energy consumption. The maximum net hydrogen yield is 16.732 moles of hydrogen per mole of heptane fed, which is 76.05% of the maximum theoretical hydrogen yield of 22. (author)

  9. Modelling Hospital Materials Management Processes

    Directory of Open Access Journals (Sweden)

    Raffaele Iannone

    2013-06-01

    integrated and detailed analysis and description model for hospital materials management data and tasks, which is able to tackle information from patient requirements to usage, from replenishment requests to supplying and handling activities. The model takes account of medical risk reduction, traceability and streamlined processes perspectives. Second, the paper translates this information into a business process model and mathematical formalization.The study provides a useful guide to the various relevant technology‐related, management and business issues, laying the foundations of an efficient reengineering of the supply chain to reduce healthcare costs and improve the quality of care.

  10. Metals and Alloys Material Stabilization Process Plan

    Energy Technology Data Exchange (ETDEWEB)

    RISENMAY, H.R.; BURK, R.A.

    2000-05-18

    This Plan outlines the process for brushing metal and alloys in accordance with the path forward discussed in the Integrated Project Management Plan for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617, and requirements set forth in the Project Management Plan for Materials Stabilization, HNF-3605. This plan provides the basis for selection of the location to process, the processes involved, equipment to be used, and the characterization of the contents of the can. The scope of the process is from retrieval of metals and alloys from storage to transfer back to storage in a repackaged configuration.

  11. Metals and Alloys Material Stabilization Process Plan

    International Nuclear Information System (INIS)

    RISENMAY, H.R.; BURK, R.A.

    2000-01-01

    This Plan outlines the process for brushing metal and alloys in accordance with the path forward discussed in the Integrated Project Management Plan for the Plutonium Finishing Plant Stabilization and Deactivation Project, HNF-3617, and requirements set forth in the Project Management Plan for Materials Stabilization, HNF-3605. This plan provides the basis for selection of the location to process, the processes involved, equipment to be used, and the characterization of the contents of the can. The scope of the process is from retrieval of metals and alloys from storage to transfer back to storage in a repackaged configuration

  12. Configuration Fuzzing for Software Vulnerability Detection.

    Science.gov (United States)

    Dai, Huning; Murphy, Christian; Kaiser, Gail

    2010-02-15

    Many software security vulnerabilities only reveal themselves under certain conditions, i.e., particular configurations of the software together with its particular runtime environment. One approach to detecting these vulnerabilities is fuzz testing, which feeds a range of randomly modified inputs to a software application while monitoring it for failures. However, typical fuzz testing makes no guarantees regarding the syntactic and semantic validity of the input, or of how much of the input space will be explored. To address these problems, in this paper we present a new testing methodology called configuration fuzzing. Configuration fuzzing is a technique whereby the configuration of the running application is randomly modified at certain execution points, in order to check for vulnerabilities that only arise in certain conditions. As the application runs in the deployment environment, this testing technique continuously fuzzes the configuration and checks "security invariants" that, if violated, indicate a vulnerability; however, the fuzzing is performed in a duplicated copy of the original process, so that it does not affect the state of the running application. In addition to discussing the approach and describing a prototype framework for implementation, we also present the results of a case study to demonstrate the approach's efficiency.

  13. The Use of Modelling Methods for Product Configuration in Industrial Applications

    DEFF Research Database (Denmark)

    Hvam, Lars; Bonev, Martin; Haug, Anders

    2014-01-01

    reported. This article investigates the challenge on how industrial companies model their product CSs. The study is based on interviews of 18 industrial companies using CSs for configuring customer-tailored products. It investigates the relationship between using a structured modelling technique...... for modelling product families relative to less or no formal approaches. Furthermore, the study explores the specific characteristics of configuration set-ups with respect to size and complexity and their effect on product variant management and availability of product knowledge in organizations. The results......Developing product configuration system (CS) requires extracting and representing domain expert knowledge in appropriate product models. As acknowledged by researchers, this is often one of the most challenging activities in configuration projects, where only little empirical insights have yet been...

  14. Industrial Application of Configurators: From Motivations to Realized Benefits

    DEFF Research Database (Denmark)

    Kristjansdottir, Katrin; Shafiee, Sara; Hvam, Lars

    to support companies applying mass customization strategies. This articles analysis the relationship between the initial motivations manufacturing companies have for implementing configurators and the realized benefits from the application of configurators. The results presented in this paper are based......Manufacturing companies are increasingly seeking to gain the benefits from mass customization strategies as a response to increased customers’ demand for customized products. To automate the process of generating products’ specifications and guide the sales process, configurators are commonly used...... on a survey followed with interviews in 22 industrial companies. The findings show that the main motivations can be grouped into seven categories, where the successfulness of achieving the targeted benefits varies between the individual categories. Furthermore, the results highlights that substantial benefits...

  15. GI-conf: A configuration tool for the GI-cat distributed catalog

    Science.gov (United States)

    Papeschi, F.; Boldrini, E.; Bigagli, L.; Mazzetti, P.

    2009-04-01

    In this work we present a configuration tool for the GI-cat. In an Service-Oriented Architecture (SOA) framework, GI-cat implements a distributed catalog service providing advanced capabilities, such as: caching, brokering and mediation functionalities. GI-cat applies a distributed approach, being able to distribute queries to the remote service providers of interest in an asynchronous style, and notifies the status of the queries to the caller implementing an incremental feedback mechanism. Today, GI-cat functionalities are made available through two standard catalog interfaces: the OGC CSW ISO and CSW Core Application Profiles. However, two other interfaces are under testing: the CIM and the EO Extension Packages of the CSW ebRIM Application Profile. GI-cat is able to interface a multiplicity of discovery and access services serving heterogeneous Earth and Space Sciences resources. They include international standards like the OGC Web Services -i.e. OGC CSW, WCS, WFS and WMS, as well as interoperability arrangements (i.e. community standards) such as: UNIDATA THREDDS/OPeNDAP, SeaDataNet CDI (Common Data Index), GBIF (Global Biodiversity Information Facility) services, and SibESS-C infrastructure services. GI-conf implements user-friendly configuration tool for GI-cat. This is a GUI application that employs a visual and very simple approach to configure both the GI-cat publishing and distribution capabilities, in a dynamic way. The tool allows to set one or more GI-cat configurations. Each configuration consists of: a) the catalog standards interfaces published by GI-cat; b) the resources (i.e. services/servers) to be accessed and mediated -i.e. federated. Simple icons are used for interfaces and resources, implementing a user-friendly visual approach. The main GI-conf functionalities are: • Interfaces and federated resources management: user can set which interfaces must be published; besides, she/he can add a new resource, update or remove an already federated

  16. Improved Performance and Quality of Configurators by Receiving Real-Time Information from Suppliers

    DEFF Research Database (Denmark)

    Kristjansdottir, Katrin; Shafiee, Sara; Bonev, Martin

    with including suppliers’ product specifications as sub-models and how these can be addressed by integrating configurators across supply chains to receive real-time information from suppliers. Based on established literature on the illustrated technical integration of configurators across the supply chains......Companies providing customized products are increasingly applying configurators in order to support the sales and design activities. Yet, especially for engineer-to-order (ETO) companies such activities are often divided across different organizations, where throughout the configuration process...... product specification has to be retrieved across the supply chains. Therefore, it is required that relevant information from suppliers is included in the configuration process, either as sub-models or by integrating configurators across the supply chains. This study investigates the challenges associated...

  17. Business process of reputation management of food industry enterprises

    OpenAIRE

    Derevianko Olena. H.

    2014-01-01

    The goal of the article is development of the methodical base of reputation management directed at formalisation of theoretical provisions and explanation how to organise reputation management at food industry enterprises. The article shows prospectiveness of use of the Business Process Management concept in reputation management. Using the diagram of the Reputation Management business process environment the article shows its key participants (suppliers and clients of the business process) a...

  18. Computer Software Configuration Item-Specific Flight Software Image Transfer Script Generator

    Science.gov (United States)

    Bolen, Kenny; Greenlaw, Ronald

    2010-01-01

    A K-shell UNIX script enables the International Space Station (ISS) Flight Control Team (FCT) operators in NASA s Mission Control Center (MCC) in Houston to transfer an entire or partial computer software configuration item (CSCI) from a flight software compact disk (CD) to the onboard Portable Computer System (PCS). The tool is designed to read the content stored on a flight software CD and generate individual CSCI transfer scripts that are capable of transferring the flight software content in a given subdirectory on the CD to the scratch directory on the PCS. The flight control team can then transfer the flight software from the PCS scratch directory to the Electronically Erasable Programmable Read Only Memory (EEPROM) of an ISS Multiplexer/ Demultiplexer (MDM) via the Indirect File Transfer capability. The individual CSCI scripts and the CSCI Specific Flight Software Image Transfer Script Generator (CFITSG), when executed a second time, will remove all components from their original execution. The tool will identify errors in the transfer process and create logs of the transferred software for the purposes of configuration management.

  19. The process approach to service quality management

    OpenAIRE

    Kamila Kowalik; Dorota Klimecka-Tatar

    2018-01-01

    In this paper a model of service quality management based on the process approach has been presented. The first part of the article contains the theoretical framework of service quality and the process approach in management. Next, quality of service process has been presented in reference to a process-based definition in quoted literature. Finally, the outcomes of a customer questionnaire concerning the validity of particular quality attributes has been presented. The collected data in relat...

  20. How to Scope a Product Configuration Project in an Engineering Company

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Bonev, Martin

    2014-01-01

    When implementing a product configuration system in a company making complex and highly engineered products, many decisions need to be made in the early phases of the project. This article presents a framework for supporting the initial scoping process and discusses experiences from applying...... the framework in an engineering company. The framework covers a number of topics, such as identifying the users of the configuration system, prioritizing the user requirements, defining the input and output, and the overall functionality of the configuration system. Furthermore, the scoping process considers...

  1. Building configuration and seismic design: The architecture of earthquake resistance

    Science.gov (United States)

    Arnold, C.; Reitherman, R.; Whitaker, D.

    1981-05-01

    The architecture of a building in relation to its ability to withstand earthquakes was determined. Aspects of round motion which are significant to building behavior are discussed. Results of a survey of configuration decisions that affect the performance of buildings with a focus on the architectural aspects of configuration design are provided. Configuration derivation, building type as it relates to seismic design, and seismic design, and seismic issues in the design process are examined. Case studies of the Veterans' Administration Hospital in Loma Linda, California, and the Imperial Hotel in Tokyo, Japan, are presented. The seismic design process is described paying special attention to the configuration issues. The need is stressed for guidelines, codes, and regulations to ensure design solutions that respect and balance the full range of architectural, engineering, and material influences on seismic hazards.

  2. Numerical modeling of optical coherent transient processes with complex configurations - II. Angled beams with arbitrary phase modulations

    International Nuclear Information System (INIS)

    Chang Tiejun; Tian Mingzhen; Barber, Zeb W.; Randall Babbitt, Wm.

    2004-01-01

    This work is a continuation of the development of the theoretical model for optical coherent transient (OCT) processes with complex configurations. A theoretical model for angled beams with arbitrary phase modulation has been developed based on the model presented in our previous work for the angled beam geometry. A numerical tool has been devised to simulate the OCT processes involving angled beams with the frequency detuning, chirped, and phase-modulated laser pulses. The simulations for pulse shaping and arbitrary waveform generation (AWG) using OCT processes have been performed. The theoretical analysis of programming and probe schemes for pulse shaper and AWG is also presented including the discussions on the rephasing condition and the phase compensation. The results from the analysis, the simulation, and the experiment show very good agreement

  3. Error management process for power stations

    International Nuclear Information System (INIS)

    Hirotsu, Yuko; Takeda, Daisuke; Fujimoto, Junzo; Nagasaka, Akihiko

    2016-01-01

    The purpose of this study is to establish 'error management process for power stations' for systematizing activities for human error prevention and for festering continuous improvement of these activities. The following are proposed by deriving concepts concerning error management process from existing knowledge and realizing them through application and evaluation of their effectiveness at a power station: an entire picture of error management process that facilitate four functions requisite for maraging human error prevention effectively (1. systematizing human error prevention tools, 2. identifying problems based on incident reports and taking corrective actions, 3. identifying good practices and potential problems for taking proactive measures, 4. prioritizeng human error prevention tools based on identified problems); detail steps for each activity (i.e. developing an annual plan for human error prevention, reporting and analyzing incidents and near misses) based on a model of human error causation; procedures and example of items for identifying gaps between current and desired levels of executions and outputs of each activity; stages for introducing and establishing the above proposed error management process into a power station. By giving shape to above proposals at a power station, systematization and continuous improvement of activities for human error prevention in line with the actual situation of the power station can be expected. (author)

  4. Framework for Knowledge Management Processes in Supply Chain

    Directory of Open Access Journals (Sweden)

    Mohsen Shafiei Nikabadi

    2014-02-01

    The innovation aspect of the research is to provide a comprehensive framework for knowledge management processes in supply chain of automotive industry with main indicators for each process. Several investigations have been made for knowledge management but specific research on knowledge management processes in the supply chain has not been observed. Thus providing the framework and indicators for each component of the framework is the innovation of the research

  5. Process information management system of TRANSPETRO; Sistema de gerenciamento de informacoes de processo

    Energy Technology Data Exchange (ETDEWEB)

    Alves, Carlos H N.; Quintella, Fabiano J.; Araujo, Luiz A.C. [CHEMTECH, Rio de Janeiro, RJ (Brazil); Fonseca, Conrad A.A.; Garcia, Marcus; Thadeo, Rafael G.O. [TRANSPETRO, Rio de Janeiro, RJ (Brazil)

    2008-07-01

    One of the most difficulties for large companies is to follow in real-time the situation of its process ensuring objectivity, trust and high availability. For TRANSPETRO, this means mapping several points among its pipelines and plants throughout Brazil. The target of this paper is to describe how TRANSPETRO does to follow those points, keeping the history of the values of its process variables to be analyzed later. For this, she acquired two new information systems that were added to existing SCADAs supervisory systems: PIMS is an information management system capable to store the variable values from SCADA systems into a historical database. And the Portal, which is responsible to manipulate and show through a web interface, to the whole company, these storied values in an objective view. Using these tools, TRANSPETRO can keep a better control over decisions that affect its business, because it can identify dynamically the strength and the weakness of its system. This Paper describes how the choice of the tools was made and how they were configured for TRANSPETRO by Chemtech. (author)

  6. Conjoint Management of Business Processes and Information Technologies

    DEFF Research Database (Denmark)

    Siurdyban, Artur

    and improve business processes. As a consequence, there is a growing need to address managerial aspects of the relationships between information technologies and business processes. The aim of this PhD study is to investigate how the practice of conjoint management of business processes and information...... technologies can be supported and improved. The study is organized into five research papers and this summary. Each paper addresses a different aspect of conjoint management of business processes and information technologies, i.e. problem development and managerial practices on software...... and information technologies in a project environment. It states that both elements are intrinsically related and should be designed and considered together. The second case examines the relationships between information technology management and business process management. It discusses the multi-faceted role...

  7. Expected and Realized Costs and Benefits from Implementing Product Configuration Systems

    DEFF Research Database (Denmark)

    Edwards, Kasper

    2010-01-01

    Product configuration systems (PCS) are a technology well suited for mass customization and support the task of configuring the product to the individual customer’s needs. PCS are at the same time complex software systems that may be tailored to solve a variety of problems for a firm, e.......g. supporting the quotation process or validating the structure of a product. This paper reports findings from a study of 12 Danish firms, which at the time of the study have implemented or are in the process of implementing product configuration systems. 12 costs and 12 benefits are identified in literature...... organization. It is observed that product configuration projects are treated as simple technical projects although they should be regarded as organizational change projects....

  8. Networked business process management

    NARCIS (Netherlands)

    Grefen, P.W.P.J.

    2013-01-01

    In the current economy, a shift can be seen from stand-alone business organizations to networks of tightly collaborating business organizations. To allow this tight collaboration, business process management in these collaborative networks is becoming increasingly important. This paper discusses

  9. Process management and controlling in diagnostic radiology

    International Nuclear Information System (INIS)

    Gocke, P.; Debatin, J.F.; Duerselen, L.F.J.

    2002-01-01

    Systematic process management and efficient quality control is rapidly gaining importance in our healthcare system. What does this mean for diagnostic radiology departments?To improve efficiency, quality and productivity the workflow within the department of diagnostic and interventional radiology at the University Hospital of Essen were restructured over the last two years. Furthermore, a controlling system was established. One of the pursued aims was to create a quality management system as a basis for the subsequent certification according to the ISO EN 9001:2000 norm.Central to the success of the workflow reorganisation was the training of selected members of the department's staff in process and quality management theory. Thereafter, a dedicated working group was created to prepare the reorganisation and the subsequent ISO certification with the support of a consulting partner. To assure a smooth implementation of the restructured workflow and create acceptance for the required ISO-9001 documentation, the entire staff was familiarized with the basic ideas of process- and quality-management in several training sessions.This manuscript summarizes the basic concepts of process and quality management as they were taught to our staff. A direct relationship towards diagnostic radiology is maintained throughout the text. (orig.) [de

  10. Intelligent Sensors for Integrated Systems Health Management (ISHM)

    Science.gov (United States)

    Schmalzel, John L.

    2008-01-01

    IEEE 1451 Smart Sensors contribute to a number of ISHM goals including cost reduction achieved through: a) Improved configuration management (TEDS); and b) Plug-and-play re-configuration. Intelligent Sensors are adaptation of Smart Sensors to include ISHM algorithms; this offers further benefits: a) Sensor validation. b) Confidence assessment of measurement, and c) Distributed ISHM processing. Space-qualified intelligent sensors are possible a) Size, mass, power constraints. b) Bus structure/protocol.

  11. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  12. An Application of Business Process Management to Health Care Facilities.

    Science.gov (United States)

    Hassan, Mohsen M D

    The purpose of this article is to help health care facility managers and personnel identify significant elements of their facilities to address, and steps and actions to follow, when applying business process management to them. The ABPMP (Association of Business Process Management Professionals) life-cycle model of business process management is adopted, and steps from Lean, business process reengineering, and Six Sigma, and actions from operations management are presented to implement it. Managers of health care facilities can find in business process management a more comprehensive approach to improving their facilities than Lean, Six Sigma, business process reengineering, and ad hoc approaches that does not conflict with them because many of their elements can be included under its umbrella. Furthermore, the suggested application of business process management can guide and relieve them from selecting among these approaches, as well as provide them with specific steps and actions that they can follow. This article fills a gap in the literature by presenting a much needed comprehensive application of business process management to health care facilities that has specific steps and actions for implementation.

  13. BUSINESS PROCESS MODELLING: A FOUNDATION FOR KNOWLEDGE MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Vesna Bosilj-Vukšić

    2006-12-01

    Full Text Available Knowledge management (KM is increasingly recognised as a strategic practice of knowledge-intensive companies, becoming an integral part of an organisation's strategy to improve business performance. This paper provides an overview of business process modelling applications and analyses the relationship between business process modelling and knowledge management projects. It presents the case study of Croatian leading banks and the insurance company, discussing its practical experience in conducting business process modelling projects and investigating the opportunity for integrating business process repository and organisational knowledge as the foundation for knowledge management system development.

  14. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    Directory of Open Access Journals (Sweden)

    Feng Qiang

    2014-04-01

    Full Text Available A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance process is described as a 3-layer multi-agent system (MAS model. A communication and reasoning strategy among the agents is put forward. A fleet maintenance personnel configuration algorithm is proposed based on contract net protocol (CNP. Finally, a fleet of 10 aircraft is studied for verification purposes. A mission type with 3 waves of continuous dispatch is imaged. Compared with the traditional methods that can just provide configuration results, the proposed method can provide optimal maintenance strategies as well.

  15. Optimization of traffic distribution control in software-configurable infrastructure of virtual data center based on a simulation model

    Directory of Open Access Journals (Sweden)

    I. P. Bolodurina

    2017-01-01

    Full Text Available Currently, the proportion of use of cloud computing technology in today's business processes of companies is growing steadily. Despite the fact that it allows you to reduce the cost of ownership and operation of IT infrastructure, there are a number of problems related to the control of data centers. One such problem is the efficiency of the use of available companies compute and network resources. One of the directions of optimization is the process of traffic control of cloud applications and services in data centers. Given the multi-tier architecture of modern data center, this problem does not quite trivial. The advantage of modern virtual infrastructure is the ability to use software-configurable networks and software-configurable data storages. However, existing solutions with algorithmic optimization does not take into account a number of features forming network traffic with multiple classes of applications. Within the framework of the exploration solved the problem of optimizing the distribution of traffic cloud applications and services for the software-controlled virtual data center infrastructure. A simulation model describing the traffic in data center and software-configurable network segments involved in the processing of user requests for applications and services located network environment that includes a heterogeneous cloud platform and software-configurable data storages. The developed model has allowed to implement cloud applications traffic management algorithm and optimize access to the storage system through the effective use of the channel for data transmission. In experimental studies found that the application of the developed algorithm can reduce the response time of cloud applications and services, and as a result improve the performance of processing user requests and to reduce the number of failures.

  16. A Critical Comparison of Alternative Distribution Configurations in Omni-Channel Retailing in Terms of Cost and Greenhouse Gas Emissions

    Directory of Open Access Journals (Sweden)

    Marco Melacini

    2018-01-01

    Full Text Available New opportunities and challenges forced by the ever-increasing importance of the online channel have arisen for retailers. The retailing industry is moving to a new phase, in which the distinctions between traditional and online channels disappear, namely omni-channel (OC retailing. At the same time, the awareness of environmentally sustainable processes has been enhanced around the world and the environmental impact that results from the online order fulfilment process is becoming a key issue for logistics managers. The new challenge is to understand how multiple channels can be synergistically managed to provide a seamless customer experience, taking an economic and environmental perspective simultaneously. Retailers need to define the distribution configuration for serving the online demand, making decisions on the integration level between online and traditional channels. In this paper, we developed an assessment model of the operational costs and greenhouse gas emissions for three distribution configurations in OC retailing. The model was also applied to a real case operating in the consumer electronics industry. Results highlighted that the search for synergies between online and traditional flows in both warehouse and transport activities is a key factor for the economic and environmental sustainability of OC systems.

  17. Enabling System Evolution through Configuration Management on the Hardware/Software Boundary

    NARCIS (Netherlands)

    Krikhaar, R.L.; Mosterman, W.; Veerman, N.P.; Verhoef, C.

    2009-01-01

    As the use of software and electronics in modern products is omnipresent and continuously increasing, companies in the embedded systems industry face increasing complexity in controlling and enabling the evolution of their IT-intensive products. Traditionally, product configurations and their

  18. Preliminary paper - Integrated control process for the development of the mined geologic disposal system

    International Nuclear Information System (INIS)

    Daniel, Russell B.; Harbert, Kevin R.; Calloway, David E.

    1997-01-01

    The US Department of Energy (DOE) Order 430.1, Life Cycle Asset Management, begins to focus DOE Programs and Projects on the total system life cycle instead of looking at project execution or operation as individual components. As DOE begins to implement this order, the DOE Management and Operating contractors must develop a process to control not only the contract baseline but also the overall life cycle baseline. This paper presents an integrated process that is currently being developed on the Yucca Mountain Project for DOE. The process integrates the current contract/project baseline management process with the management control process for design and the configuration management change control process

  19. Offshore Vendors' Software Development Team Configuration

    DEFF Research Database (Denmark)

    Chakraborty, Suranjan; Sarker, Saonee; Rai, Sudhanshu

    2011-01-01

    were compared on their inherent process-related and resource-related flexibilities. The thick-at-client configuration emerged as the one that offers superior flexibility (in all dimensions).However, additional analysis also revealed contingencies apart from flexibility that may influence...

  20. Using color management in color document processing

    Science.gov (United States)

    Nehab, Smadar

    1995-04-01

    Color Management Systems have been used for several years in Desktop Publishing (DTP) environments. While this development hasn't matured yet, we are already experiencing the next generation of the color imaging revolution-Device Independent Color for the small office/home office (SOHO) environment. Though there are still open technical issues with device independent color matching, they are not the focal point of this paper. This paper discusses two new and crucial aspects in using color management in color document processing: the management of color objects and their associated color rendering methods; a proposal for a precedence order and handshaking protocol among the various software components involved in color document processing. As color peripherals become affordable to the SOHO market, color management also becomes a prerequisite for common document authoring applications such as word processors. The first color management solutions were oriented towards DTP environments whose requirements were largely different. For example, DTP documents are image-centric, as opposed to SOHO documents that are text and charts centric. To achieve optimal reproduction on low-cost SOHO peripherals, it is critical that different color rendering methods are used for the different document object types. The first challenge in using color management of color document processing is the association of rendering methods with object types. As a result of an evolutionary process, color matching solutions are now available as application software, as driver embedded software and as operating system extensions. Consequently, document processing faces a new challenge, the correct selection of the color matching solution while avoiding duplicate color corrections.

  1. Generic Health Management: A System Engineering Process Handbook Overview and Process

    Science.gov (United States)

    Wilson, Moses Lee; Spruill, Jim; Hong, Yin Paw

    1995-01-01

    Health Management, a System Engineering Process, is one of those processes-techniques-and-technologies used to define, design, analyze, build, verify, and operate a system from the viewpoint of preventing, or minimizing, the effects of failure or degradation. It supports all ground and flight elements during manufacturing, refurbishment, integration, and operation through combined use of hardware, software, and personnel. This document will integrate Health Management Processes (six phases) into five phases in such a manner that it is never a stand alone task/effort which separately defines independent work functions.

  2. SOLVING OPTIMAL ASSEMBLY LINE CONFIGURATION TASK BY MULTIOBJECTIVE DECISION MAKING METHODS

    Directory of Open Access Journals (Sweden)

    Ján ČABALA

    2017-06-01

    Full Text Available This paper deals with looking for the optimal configuration of automated assembly line model placed within Department of Cybernetics and Artificial Intelligence (DCAI. In order to solve this problem, Stateflow model of each configuration was created to simulate the behaviour of particular assembly line configuration. Outputs from these models were used as inputs into the multiobjective decision making process. Multi-objective decision-making methods were subsequently used to find the optimal configuration of assembly line. Paper describes the whole process of solving this task, from building the models to choosing the best configuration. Specifically, the problem was resolved using the experts’ evaluation method for evaluating the weights of every decision-making criterion, while the ELECTRE III, TOPSIS and AGREPREF methods were used for ordering the possible solutions from the most to the least suitable alternative. Obtained results were compared and final solution of this multi-objective decisionmaking problem is chosen.

  3. Magnetic reconnection and current sheet formation in 3D magnetic configurations

    International Nuclear Information System (INIS)

    Frank, A.G.

    1999-01-01

    The problem of magnetic reconnection in three-dimensional (3D) magnetic configurations has been studied experimentally. The research has concentrated on the possibilities of formation of current sheets, which represent crucial objects for a realization of magnetic reconnection phenomena. Different types of 3D magnetic configurations were examined, including configurations with singular lines of the X-type, non-uniform fields containing isolated magnetic null-points and without null-points. It was revealed that formation of quasi-one-dimensional current sheets is the universal process for plasma dynamics in 3D magnetic fields both with null-points and without. At the same time the peculiarities of current sheets, plasma dynamics and magnetic reconnection processes depend essentially on characteristics of 3D magnetic configurations. The result of principal significance obtained was that magnetic reconnection phenomena can take place in a wide range of 3D magnetic configurations as a consequence of their ability to form current sheets. (author)

  4. Situational Script Management of Business Processes with Changeable Structure

    OpenAIRE

    Chaliy, Sergey; Chala, Oksana

    2008-01-01

    In the presented work the problem of management business-processes with changeable structure is considered and situational based approach to its decision is offered. The approach is based on situational model of management business-process according to which process is represented as a set of situations. The script defining necessary actions is connected with each situation. Management of process is carried out by means of the rules formalizing functional requirements to processes.

  5. TECHNOLOGY MANAGEMENT PROCESS FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Ikura Yamamoto

    2012-02-01

    Full Text Available The effective management of technology as a source of competitive advantage is of vital importance for many organizations. It is necessary to understand, communicate and integrate technology strategy with marketing, financial, operations and human resource strategies. This is of particular importance when one considers the increasing cost, pace and complexity of technology developments, combined with shortening product life cycles. A five process model provides a framework within which technology management activities can be understood: identification, selection, acquisition, exploitation and protection. Based on this model, a technology management assessment procedure has been developed, using an ``action research’’ approach. This paper presents an industrial case study describing the first full application of the procedure within a high-volume manufacturing business. The impact of applying the procedure is assessed in terms of benefits to the participating business, together with improvements to the assessment procedure itself, in the context of the action research framework. Keyword: Technology, Strategy, Management, Assessment

  6. Onset of pseudo-thermal equilibrium within configurations and super-configurations

    International Nuclear Information System (INIS)

    Busquet, Michel

    2006-01-01

    Level populations within a configuration and configuration populations within super-configuration or within one ion are shown to follow a Boltzmann law at some effective temperature different from the actual electron temperature (as it would be when Griem criterion is valid). Origin of this pseudo-thermal equilibrium is discussed and basis of a model are presented

  7. Onset of pseudo-thermal equilibrium within configurations and super-configurations

    Energy Technology Data Exchange (ETDEWEB)

    Busquet, Michel [ARTEP Inc., 2922 Excelsior Springs Court, Elicott City, MD 21042 (United States)]. E-mail: busquet@this.nrl.navy.mil

    2006-05-15

    Level populations within a configuration and configuration populations within super-configuration or within one ion are shown to follow a Boltzmann law at some effective temperature different from the actual electron temperature (as it would be when Griem criterion is valid). Origin of this pseudo-thermal equilibrium is discussed and basis of a model are presented.

  8. Process management - critical safety issues with focus on risk management

    International Nuclear Information System (INIS)

    Sanne, Johan M.

    2005-12-01

    Organizational changes focused on process orientation are taking place among Swedish nuclear power plants, aiming at improving the operation. The Swedish Nuclear Power Inspectorate has identified a need for increased knowledge within the area for its regulatory activities. In order to analyze what process orientation imply for nuclear power plant safety a number of questions must be asked: 1. How is safety in nuclear power production created currently? What significance does the functional organization play? 2. How can organizational forms be analysed? What consequences does quality management have for work and for the enterprise? 3. Why should nuclear power plants be process oriented? Who are the customers and what are their customer values? Which customers are expected to contribute from process orientation? 4. What can one learn from process orientation in other safety critical systems? What is the effect on those features that currently create safety? 5. Could customer values increase for one customer without decreasing for other customers? What is the relationship between economic and safety interests from an increased process orientation? The deregulation of the electricity market have caused an interest in increased economic efficiency, which is the motivation for the interest in process orientation. among other means. It is the nuclear power plants' owners and the distributors (often the same corporations) that have the strongest interest in process orientation. If the functional organization and associated practices are decomposed, the prerequisites of the risk management regime changes, perhaps deteriorating its functionality. When nuclear power operators consider the introduction of process orientation, the Nuclear Power Inspectorate should require that 1. The operators perform a risk analysis beforehand concerning the potential consequences that process orientation might convey: the analysis should contain a model specifying how safety is currently

  9. Leading processes of patient care and treatment in hierarchical healthcare organizations in Sweden--process managers' experiences.

    Science.gov (United States)

    Nilsson, Kerstin; Sandoff, Mette

    2015-01-01

    The purpose of this study is to gain better understanding of the roles and functions of process managers by describing Swedish process managers' experiences of leading processes involving patient care and treatment when working in a hierarchical health-care organization. This study is based on an explorative design. The data were gathered from interviews with 12 process managers at three Swedish hospitals. These data underwent qualitative and interpretative analysis with a modified editing style. The process managers' experiences of leading processes in a hierarchical health-care organization are described under three themes: having or not having a mandate, exposure to conflict situations and leading process development. The results indicate a need for clarity regarding process manager's responsibility and work content, which need to be communicated to all managers and staff involved in the patient care and treatment process, irrespective of department. There also needs to be an emphasis on realistic expectations and orientation of the goals that are an intrinsic part of the task of being a process manager. Generalizations from the results of the qualitative interview studies are limited, but a deeper understanding of the phenomenon was reached, which, in turn, can be transferred to similar settings. This study contributes qualitative descriptions of leading care and treatment processes in a functional, hierarchical health-care organization from process managers' experiences, a subject that has not been investigated earlier.

  10. Configuration Management at NASA

    Science.gov (United States)

    Doreswamy, Rajiv

    2013-01-01

    NASA programs are characterized by complexity, harsh environments and the fact that we usually have one chance to get it right. Programs last decades and need to accept new hardware and technology as it is developed. We have multiple suppliers and international partners Our challenges are many, our costs are high and our failures are highly visible. CM systems need to be scalable, adaptable to new technology and span the life cycle of the program (30+ years). Multiple Systems, Contractors and Countries added major levels of complexity to the ISS program and CM/DM and Requirements management systems center dot CM Systems need to be designed for long design life center dot Space Station Design started in 1984 center dot Assembly Complete in 2012 center dot Systems were developed on a task basis without an overall system perspective center dot Technology moves faster than a large project office, try to make sure you have a system that can adapt

  11. A new approach to configurable primary data collection.

    Science.gov (United States)

    Stanek, J; Babkin, E; Zubov, M

    2016-09-01

    The formats, semantics and operational rules of data processing tasks in genomics (and health in general) are highly divergent and can rapidly change. In such an environment, the problem of consistent transformation and loading of heterogeneous input data to various target repositories becomes a critical success factor. The objective of the project was to design a new conceptual approach to configurable data transformation, de-identification, and submission of health and genomic data sets. Main motivation was to facilitate automated or human-driven data uploading, as well as consolidation of heterogeneous sources in large genomic or health projects. Modern methods of on-demand specialization of generic software components were applied. For specification of input-output data and required data collection activities, we propose a simple data model of flat tables as well as a domain-oriented graphical interface and portable representation of transformations in XML. Using such methods, the prototype of the Configurable Data Collection System (CDCS) was implemented in Java programming language with Swing graphical interfaces. The core logic of transformations was implemented as a library of reusable plugins. The solution is implemented as a software prototype for a configurable service-oriented system for semi-automatic data collection, transformation, sanitization and safe uploading to heterogeneous data repositories-CDCS. To address the dynamic nature of data schemas and data collection processes, the CDCS prototype facilitates interactive, user-driven configuration of the data collection process and extends basic functionality with a wide range of third-party plugins. Notably, our solution also allows for the reduction of manual data entry for data originally missing in the output data sets. First experiments and feedback from domain experts confirm the prototype is flexible, configurable and extensible; runs well on data owner's systems; and is not dependent on

  12. Auto-Configuration Protocols in Mobile Ad Hoc Networks

    Science.gov (United States)

    Villalba, Luis Javier García; Matesanz, Julián García; Orozco, Ana Lucila Sandoval; Díaz, José Duván Márquez

    2011-01-01

    The TCP/IP protocol allows the different nodes in a network to communicate by associating a different IP address to each node. In wired or wireless networks with infrastructure, we have a server or node acting as such which correctly assigns IP addresses, but in mobile ad hoc networks there is no such centralized entity capable of carrying out this function. Therefore, a protocol is needed to perform the network configuration automatically and in a dynamic way, which will use all nodes in the network (or part thereof) as if they were servers that manage IP addresses. This article reviews the major proposed auto-configuration protocols for mobile ad hoc networks, with particular emphasis on one of the most recent: D2HCP. This work also includes a comparison of auto-configuration protocols for mobile ad hoc networks by specifying the most relevant metrics, such as a guarantee of uniqueness, overhead, latency, dependency on the routing protocol and uniformity. PMID:22163814

  13. Auto-configuration protocols in mobile ad hoc networks.

    Science.gov (United States)

    Villalba, Luis Javier García; Matesanz, Julián García; Orozco, Ana Lucila Sandoval; Díaz, José Duván Márquez

    2011-01-01

    The TCP/IP protocol allows the different nodes in a network to communicate by associating a different IP address to each node. In wired or wireless networks with infrastructure, we have a server or node acting as such which correctly assigns IP addresses, but in mobile ad hoc networks there is no such centralized entity capable of carrying out this function. Therefore, a protocol is needed to perform the network configuration automatically and in a dynamic way, which will use all nodes in the network (or part thereof) as if they were servers that manage IP addresses. This article reviews the major proposed auto-configuration protocols for mobile ad hoc networks, with particular emphasis on one of the most recent: D2HCP. This work also includes a comparison of auto-configuration protocols for mobile ad hoc networks by specifying the most relevant metrics, such as a guarantee of uniqueness, overhead, latency, dependency on the routing protocol and uniformity.

  14. Model-based version management system framework

    International Nuclear Information System (INIS)

    Mehmood, W.

    2016-01-01

    In this paper we present a model-based version management system. Version Management System (VMS) a branch of software configuration management (SCM) aims to provide a controlling mechanism for evolution of software artifacts created during software development process. Controlling the evolution requires many activities to perform, such as, construction and creation of versions, identification of differences between versions, conflict detection and merging. Traditional VMS systems are file-based and consider software systems as a set of text files. File based VMS systems are not adequate for performing software configuration management activities such as, version control on software artifacts produced in earlier phases of the software life cycle. New challenges of model differencing, merge, and evolution control arise while using models as central artifact. The goal of this work is to present a generic framework model-based VMS which can be used to overcome the problem of tradition file-based VMS systems and provide model versioning services. (author)

  15. Knowledge Management in Product Development Projects

    International Nuclear Information System (INIS)

    Sheik Muhamad, S.

    2016-01-01

    Full text: Product data management system (PDM) solutions control vast quantities of information generated by engineers during the product development process. They provide vaulting capabilities to control access to shared data,workflow to distribute it, and configured product structures to relate it to product components. Nuclear Malaysia has the desire to have a proper CAD management system and this is achieved with the use of PDM system to manage all their designs throughout the product lifecycle, i.e., for drawing distribution and design change. The type of documents that Nuclear Malaysia manages are CAD files (as generated by CATIA, AUTOCAD), engineering files, reports, project files, documents (WORD, PDF), spreadsheet (EXCEL), bills of material, manufacturing processes and drawings. Besides managing drawings, we also want to control and manage engineering changes (ECO & ECR) in electronic format. (author

  16. Contingency Management and deliberative decision-making processes

    Directory of Open Access Journals (Sweden)

    Paul S. Regier

    2015-06-01

    Full Text Available Contingency Management is an effective treatment for drug addiction. The current explanation for its success is rooted in alternative reinforcement theory. We suggest that alternative reinforcement theory is inadequate to explain the success of Contingency Management and produce a model based on demand curves that show how little the monetary rewards offered in this treatment would affect drug use. Instead, we offer an explanation of its success based on the concept that it accesses deliberative decision-making processes. We suggest that Contingency Management is effective because it offers a concrete and immediate alternative to using drugs, which engages deliberative processes, improves the ability of those deliberative processes to attend to non-drug options, and offsets more automatic action-selection systems. This theory makes explicit predictions that can be tested, suggests which users will be most helped by Contingency Management, and suggests improvements in its implementation.

  17. Contingency Management and Deliberative Decision-Making Processes.

    Science.gov (United States)

    Regier, Paul S; Redish, A David

    2015-01-01

    Contingency management is an effective treatment for drug addiction. The current explanation for its success is rooted in alternative reinforcement theory. We suggest that alternative reinforcement theory is inadequate to explain the success of contingency management and produce a model based on demand curves that show how little the monetary rewards offered in this treatment would affect drug use. Instead, we offer an explanation of its success based on the concept that it accesses deliberative decision-making processes. We suggest that contingency management is effective because it offers a concrete and immediate alternative to using drugs, which engages deliberative processes, improves the ability of those deliberative processes to attend to non-drug options, and offsets more automatic action-selection systems. This theory makes explicit predictions that can be tested, suggests which users will be most helped by contingency management, and suggests improvements in its implementation.

  18. USAR managing and updating process

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.

    1996-01-01

    In this paper basis and background of the FSAR (Final Safety Analysis Report) document and its conversion process to the USAR (Updated Safety Analysis Report) document are described. In addition, there are internal and external reviews as approval process presented. The following is included in our new approach to manage USAR changes: initiating the USAR change, technical reviewing, preparing a safety evaluation, KSC (Krsko Safety Committee) and KOC (Krsko Operating Committee) review, ESD Director approval, and the Regulatory Body review or approval. The intensive technological modification activities started in the year 1992 when the NEK Engineering Services Division was established. These activities are one of the most important reason for a very intensive USAR items change. The other reason for its conversation to an electronic format is a possibility for easier and faster searching, updating and changing process and introducing a new systematic USAR managing approach as mentioned above. (author)

  19. Model medication management process in Australian nursing homes using business process modeling.

    Science.gov (United States)

    Qian, Siyu; Yu, Ping

    2013-01-01

    One of the reasons for end user avoidance or rejection to use health information systems is poor alignment of the system with healthcare workflow, likely causing by system designers' lack of thorough understanding about healthcare process. Therefore, understanding the healthcare workflow is the essential first step for the design of optimal technologies that will enable care staff to complete the intended tasks faster and better. The often use of multiple or "high risk" medicines by older people in nursing homes has the potential to increase medication error rate. To facilitate the design of information systems with most potential to improve patient safety, this study aims to understand medication management process in nursing homes using business process modeling method. The paper presents study design and preliminary findings from interviewing two registered nurses, who were team leaders in two nursing homes. Although there were subtle differences in medication management between the two homes, major medication management activities were similar. Further field observation will be conducted. Based on the data collected from observations, an as-is process model for medication management will be developed.

  20. Configuration affects parallel stent grafting results.

    Science.gov (United States)

    Tanious, Adam; Wooster, Mathew; Armstrong, Paul A; Zwiebel, Bruce; Grundy, Shane; Back, Martin R; Shames, Murray L

    2018-05-01

    A number of adjunctive "off-the-shelf" procedures have been described to treat complex aortic diseases. Our goal was to evaluate parallel stent graft configurations and to determine an optimal formula for these procedures. This is a retrospective review of all patients at a single medical center treated with parallel stent grafts from January 2010 to September 2015. Outcomes were evaluated on the basis of parallel graft orientation, type, and main body device. Primary end points included parallel stent graft compromise and overall endovascular aneurysm repair (EVAR) compromise. There were 78 patients treated with a total of 144 parallel stents for a variety of pathologic processes. There was a significant correlation between main body oversizing and snorkel compromise (P = .0195) and overall procedural complication (P = .0019) but not with endoleak rates. Patients were organized into the following oversizing groups for further analysis: 0% to 10%, 10% to 20%, and >20%. Those oversized into the 0% to 10% group had the highest rate of overall EVAR complication (73%; P = .0003). There were no significant correlations between any one particular configuration and overall procedural complication. There was also no significant correlation between total number of parallel stents employed and overall complication. Composite EVAR configuration had no significant correlation with individual snorkel compromise, endoleak, or overall EVAR or procedural complication. The configuration most prone to individual snorkel compromise and overall EVAR complication was a four-stent configuration with two stents in an antegrade position and two stents in a retrograde position (60% complication rate). The configuration most prone to endoleak was one or two stents in retrograde position (33% endoleak rate), followed by three stents in an all-antegrade position (25%). There was a significant correlation between individual stent configuration and stent compromise (P = .0385), with 31

  1. CM Process Improvement and the International Space Station Program (ISSP)

    Science.gov (United States)

    Stephenson, Ginny

    2007-01-01

    This viewgraph presentation reviews the Configuration Management (CM) process improvements planned and undertaken for the International Space Station Program (ISSP). It reviews the 2004 findings and recommendations and the progress towards their implementation.

  2. The clinical nurse specialist as resuscitation process manager.

    Science.gov (United States)

    Schneiderhahn, Mary Elizabeth; Fish, Anne Folta

    2014-01-01

    The purpose of this article was to describe the history and leadership dimensions of the role of resuscitation process manager and provide specific examples of how this role is implemented at a Midwest medical center. In 1992, a medical center in the Midwest needed a nurse to manage resuscitation care. This role designation meant that this nurse became central to all quality improvement efforts in resuscitation care. The role expanded as clinical resuscitation guidelines were updated and as the medical center grew. The role became known as the critical care clinical nurse specialist as resuscitation process manager. This clinical care nurse specialist was called a manager, but she had no direct line authority, so she accomplished her objectives by forming a multitude of collaborative networks. Based on a framework by Finkelman, the manager role incorporated specific leadership abilities in quality improvement: (1) coordination of medical center-wide resuscitation, (2) use of interprofessional teams, (3) integration of evidence into practice, and (4) staff coaching to develop leadership. The manager coordinates resuscitation care with the goals of prevention of arrests if possible, efficient and effective implementation of resuscitation protocols, high quality of patient and family support during and after the resuscitation event, and creation or revision of resuscitation policies for in-hospital and for ambulatory care areas. The manager designs a comprehensive set of meaningful and measurable process and outcome indicators with input from interprofessional teams. The manager engages staff in learning, reflecting on care given, and using the evidence base for resuscitation care. Finally, the manager role is a balance between leading quality improvement efforts and coaching staff to implement and sustain these quality improvement initiatives. Revisions to clinical guidelines for resuscitation care since the 1990s have resulted in medical centers developing improved

  3. Software Process Improvement Journey: IBM Australia Application Management Services

    Science.gov (United States)

    2005-03-01

    See Section 5.1.2) - Client Relationship Management ( CRM ) processes-specifically, Solution Design and Solution Delivery - Worldwide Project Management ...plex systems life-cycle management , rapid solutions development, custom development, package selection and implementation, maintenance, minor...CarnegieMellon ___ Software Engineering Institute Software Process Improvement Journey: IBM Australia Application Management Services Robyn Nichols

  4. Integrating policy-based management and SLA performance monitoring

    Science.gov (United States)

    Liu, Tzong-Jye; Lin, Chin-Yi; Chang, Shu-Hsin; Yen, Meng-Tzu

    2001-10-01

    Policy-based management system provides the configuration capability for the system administrators to focus on the requirements of customers. The service level agreement performance monitoring mechanism helps system administrators to verify the correctness of policies. However, it is difficult for a device to process the policies directly because the policies are the management concept. This paper proposes a mechanism to decompose a policy into rules that can be efficiently processed by a device. Thus, the device may process the rule and collect the performance statistics information efficiently; and the policy-based management system may collect these performance statistics information and report the service-level agreement performance monitoring information to the system administrator. The proposed policy-based management system achieves both the policy configuration and service-level agreement performance monitoring requirements. A policy consists of a condition part and an action part. The condition part is a Boolean expression of a source host IP group, a destination host IP group, etc. The action part is the parameters of services. We say that an address group is compact if it only consists of a range of IP address that can be denoted by a pair of IP address and corresponding IP mask. If the condition part of a policy only consists of the compact address group, we say that the policy is a rule. Since a device can efficiently process a compact address and a system administrator prefers to define a range of IP address, the policy-based management system has to translate policy into rules and supplements the gaps between policy and rules. The proposed policy-based management system builds the relationships between VPN and policies, policy and rules. Since the system administrator wants to monitor the system performance information of VPNs and policies, the proposed policy-based management system downloads the relationships among VPNs, policies and rules to the

  5. Method for Business Process Management System Selection

    OpenAIRE

    Westelaken, van de, Thijs; Terwee, Bas; Ravesteijn, Pascal

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However the research on BPMS is mostly focused on the architecture of the system and how to implement such systems. How to select a BPM system that fits the strategy and goals of a specific organization is ...

  6. BUSINESS PROCESSES TRANSFORMATION IN THE METHODOLOGY OF MULTILEVEL FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Andrey G. Mikheev

    2016-01-01

    Full Text Available The article discusses the application of process approach to financial management. The multilevel financial management methodology is described. It is based on the delegation of the financial management functions in the downstream division of the organization, process automation, transfer of financial resources between units of different levels of the hierarchical structure of the credit institution, the implementation of a financial management mechanism of the process approach, execution of business processes in the computer environment, using the strategic management of the organization by changing the coefficients, which are the parameters of decentralized control mechanism, using the construction of the «fast» financial indicators, taking into account the terms of financial resources transfer transactions and effective transformation of business processes. The article is focused on the credit institution business management through the application of process transformation to transfer funds business processes.

  7. Fuselet Authoring, Execution, and Management in Support of Global Strike Operations

    National Research Council Canada - National Science Library

    Haglich, Peter

    2008-01-01

    ...) report, "Information Management to Support the Warrior." A fuselet is a configurable, reusable transformation component, designed to enable shared business processes across organizational and community of interest boundaries...

  8. A multi-agent based intelligent configuration method for aircraft fleet maintenance personnel

    OpenAIRE

    Feng, Qiang; Li, Songjie; Sun, Bo

    2014-01-01

    A multi-agent based fleet maintenance personnel configuration method is proposed to solve the mission oriented aircraft fleet maintenance personnel configuration problem. The maintenance process of an aircraft fleet is analyzed first. In the process each aircraft contains multiple parts, and different parts are repaired by personnel with different majors and levels. The factors and their relationship involved in the process of maintenance are analyzed and discussed. Then the whole maintenance...

  9. On Representing Instance Changes in Adaptive Process Management Systems.

    NARCIS (Netherlands)

    Rinderle, S.B.; Kreher, U; Lauer, M.; Dadam, P.; Reichert, M.U.

    2006-01-01

    By separating the process logic from the application code process management systems (PMS) offer promising perspectives for automation and management of business processes. However, the added value of PMS strongly depends on their ability to support business process changes which can affect the

  10. Software configuration management plan for the TWRS controlled baseline database system [TCBD

    International Nuclear Information System (INIS)

    Spencer, S.G.

    1998-01-01

    LHMC, TWRS Business Management Organization (BMO) is designated as system owner, operator, and maintenance authority. The TWAS BMO identified the need for the TCBD. The TWRS BMO users have established all requirements for the database and are responsible for maintaining database integrity and control (after the interface data has been received). Initial interface data control and integrity is maintained through functional and administrative processes and is the responsibility of the database owners who are providing the data. The specific groups within the TWRS BMO affected by this plan are the Financial Management and TWRS Management Support Project, Master Planning, and the Financial Control Integration and Reporting. The interfaces between these organizations are through normal line management chain of command. The Master Planning Group is assigned the responsibility to continue development and maintenance of the TCBD. This group maintains information that includes identification of requirements and changes to those requirements in a TCBD project file. They are responsible for the issuance, maintenance, and change authority of this SCW. LHMC, TWRS TCBD Users are designated as providing the project's requirement changes for implementation and also testing of the TCBD during development. The Master Planning Group coordinates and monitors the user's requests for system requirements (new/existing) as well as beta and acceptance testing. Users are those individuals and organizations needing data or information from the TCBD and having both a need-to-know and the proper training and authority to access the database. Each user or user organization is required to comply with the established requirements and procedures governing the TCBD. Lockheed Martin Services, Inc. (LMSI) is designated the TCBD developer, maintainer, and custodian until acceptance and process testing of the system has been completed via the TWRS BMO. Once this occurs, the TCBD will be completed and

  11. Design of distributed systems of hydrolithosphere processes management. A synthesis of distributed management systems

    Science.gov (United States)

    Pershin, I. M.; Pervukhin, D. A.; Ilyushin, Y. V.; Afanaseva, O. V.

    2017-10-01

    The paper considers an important problem of designing distributed systems of hydrolithosphere processes management. The control actions on the hydrolithosphere processes under consideration are implemented by a set of extractive wells. The article shows the method of defining the approximation links for description of the dynamic characteristics of hydrolithosphere processes. The structure of distributed regulators, used in the management systems by the considered processes, is presented. The paper analyses the results of the synthesis of the distributed management system and the results of modelling the closed-loop control system by the parameters of the hydrolithosphere process.

  12. [Reflections on the management of deinstitutionalization process].

    Science.gov (United States)

    Lucena, Marcela Adriana da Silva; Bezerra, Adriana Falangola Benjamin

    2012-09-01

    This study addresses mental health and, based on a conceptual review, offers considerations on the management of deinstitutionalization processes regarding individuals interned in long-stay psychiatric institutions. Elements concerning asylum formation and logic are discussed, along with the mechanisms necessary for the effective change in paradigm and practices, with deinstitutionalization and psychosocial rehabilitation as the core issues. Reflections are offered regarding management actions committed to the psychosocial model, linking such actions to the application of the components of care and going beyond the articulation of the tools of mental health policy. Theoretical reflection offers suggestions referring to the qualification processes of mental health professionals, deinstitutionalization in the management of the Unified Health System and tripartite action with co-accountability in actions and financing. The final considerations recognize the bureaucratic obstacles in the public realm and propose facing these challenges as a management challenge, along with processes of change that can radically commit to the lives of people, thereby broadening the discussion to the ethical realm.

  13. Management by process based systems and safety focus; Verksamhetsstyrning med process-baserade ledningssystem och saekerhetsfokus

    Energy Technology Data Exchange (ETDEWEB)

    Rydnert, Bo; Groenlund, Bjoern [SIS Forum AB, Stockholm (Sweden)

    2005-12-15

    An initiative from The Swedish Nuclear Power Inspectorate led to this study carried out in the late autumn of 2005. The objective was to understand in more detail how an increasing use of process management affects organisations, on the one hand regarding risks and security, on the other hand regarding management by objectives and other management and operative effects. The main method was interviewing representatives of companies and independent experts. More than 20 interviews were carried out. In addition a literature study was made. All participating companies are using Management Systems based on processes. However, the methods chosen, and the results achieved, vary extensively. Thus, there are surprisingly few examples of complete and effective management by processes. Yet there is no doubt that management by processes is effective and efficient. Overall goals are reached, business results are achieved in more reliable ways and customers are more satisfied. The weaknesses found can be translated into a few comprehensive recommendations. A clear, structured and acknowledged model should be used and the processes should be described unambiguously. The changed management roles should be described and obeyed extremely legibly. New types of process objectives need to be formulated. In addition one fact needs to be observed and effectively fended off. Changes are often met by mental opposition on management level, as well as among co-workers. This fact needs attention and leadership. Safety development is closely related to the design and operation of a business management system and its continual improvement. A deep understanding of what constitutes an efficient and effective management system affects the understanding of safety. safety culture and abilities to achieve safety goals. Concerning risk, the opinions were unambiguous. Management by processes as such does not result in any further risks. On the contrary. Processes give a clear view of production and

  14. Configurational entropy of anti-de Sitter black holes

    International Nuclear Information System (INIS)

    Braga, Nelson R.F.; Rocha, Roldão da

    2017-01-01

    Recent studies indicate that the configurational entropy is an useful tool to investigate the stability and (or) the relative dominance of states for diverse physical systems. Recent examples comprise the connection between the variation of this quantity and the relative fraction of light mesons and glueballs observed in hadronic processes. Here we develop a technique for defining a configurational entropy for an AdS-Schwarzschild black hole. The achieved result corroborates consistency with the Hawking–Page phase transition. Namely, the dominance of the black hole configurational entropy will be shown to increase with the temperature. In order to verify the consistency of the new procedure developed here, we also consider the case of black holes in flat space-time. For such a black hole, it is known that evaporation leads to instability. The configurational entropy obtained for the flat space case is thoroughly consistent with the physical expectation. In fact, we show that the smaller the black holes, the more unstable they are. So, the configurational entropy furnishes a reliable measure for stability of black holes.

  15. Configurational entropy of anti-de Sitter black holes

    Energy Technology Data Exchange (ETDEWEB)

    Braga, Nelson R.F., E-mail: braga@if.ufrj.br [Instituto de Física, Universidade Federal do Rio de Janeiro, Caixa Postal 68528, RJ 21941-972 (Brazil); Rocha, Roldão da, E-mail: roldao.rocha@ufabc.edu.br [Centro de Matemática, Computação e Cognição, Universidade Federal do ABC – UFABC, 09210-580, Santo André (Brazil)

    2017-04-10

    Recent studies indicate that the configurational entropy is an useful tool to investigate the stability and (or) the relative dominance of states for diverse physical systems. Recent examples comprise the connection between the variation of this quantity and the relative fraction of light mesons and glueballs observed in hadronic processes. Here we develop a technique for defining a configurational entropy for an AdS-Schwarzschild black hole. The achieved result corroborates consistency with the Hawking–Page phase transition. Namely, the dominance of the black hole configurational entropy will be shown to increase with the temperature. In order to verify the consistency of the new procedure developed here, we also consider the case of black holes in flat space-time. For such a black hole, it is known that evaporation leads to instability. The configurational entropy obtained for the flat space case is thoroughly consistent with the physical expectation. In fact, we show that the smaller the black holes, the more unstable they are. So, the configurational entropy furnishes a reliable measure for stability of black holes.

  16. Face Recognition in 4- to 7-Year-Olds: Processing of Configural, Featural, and Paraphernalia Information.

    Science.gov (United States)

    Freire, Alejo; Lee, Kang

    2001-01-01

    Tested in two studies 4- to 7-year-olds' face recognition by manipulating the faces' configural and featural information. Found that even with only a single 5-second exposure, most children could use configural and featural cues to make identity judgments. Repeated exposure and feedback improved others' performance. Even proficient memories were…

  17. The impact of product configurators on lead times in engineering-oriented companies

    DEFF Research Database (Denmark)

    Haug, Anders; Hvam, Lars; Mortensen, Niels Henrik

    2011-01-01

    This paper presents a study of how the use of product configurators affects business processes of engineering-oriented companies. A literature study shows that only a minor part of product configuration research deals with the effects of product configuration, and that the ones that do are mostly...... vague when reporting the effects of configurator projects. Only six cases were identified, which provide estimates of the actual size of lead time reduction achieved from product configurators. To broaden this knowledge, this paper presents the results of a study of 14 companies concerning the impact...

  18. Risk Management for e-Business

    Directory of Open Access Journals (Sweden)

    2007-01-01

    Full Text Available In the new Internet economy, risk management plays a critical role to protect the organization and its ability to perform their business mission, not just its IT assets. Risk management is the process of identifying risk, assessing risk, and taking steps to reduce risk to an acceptable level. The risk management is an important component of a IT security program. Information and communications technology management and IT security are responsible for ensuring that technology risks are managed appropriately. These risks originate from the deployment and use of IT assets in various ways, such as configuring systems incorrectly or gaining access to restricted software.

  19. Optimal Multi-scale Demand-side Management for Continuous Power-Intensive Processes

    Science.gov (United States)

    Mitra, Sumit

    With the advent of deregulation in electricity markets and an increasing share of intermittent power generation sources, the profitability of industrial consumers that operate power-intensive processes has become directly linked to the variability in energy prices. Thus, for industrial consumers that are able to adjust to the fluctuations, time-sensitive electricity prices (as part of so-called Demand-Side Management (DSM) in the smart grid) offer potential economical incentives. In this thesis, we introduce optimization models and decomposition strategies for the multi-scale Demand-Side Management of continuous power-intensive processes. On an operational level, we derive a mode formulation for scheduling under time-sensitive electricity prices. The formulation is applied to air separation plants and cement plants to minimize the operating cost. We also describe how a mode formulation can be used for industrial combined heat and power plants that are co-located at integrated chemical sites to increase operating profit by adjusting their steam and electricity production according to their inherent flexibility. Furthermore, a robust optimization formulation is developed to address the uncertainty in electricity prices by accounting for correlations and multiple ranges in the realization of the random variables. On a strategic level, we introduce a multi-scale model that provides an understanding of the value of flexibility of the current plant configuration and the value of additional flexibility in terms of retrofits for Demand-Side Management under product demand uncertainty. The integration of multiple time scales leads to large-scale two-stage stochastic programming problems, for which we need to apply decomposition strategies in order to obtain a good solution within a reasonable amount of time. Hence, we describe two decomposition schemes that can be applied to solve two-stage stochastic programming problems: First, a hybrid bi-level decomposition scheme with

  20. Organizational agility key factors for dynamic business process management

    OpenAIRE

    Triaa , Wafa; Gzara , Lilia; Verjus , Hervé

    2016-01-01

    International audience; For several years, Business Process Management (BPM) is recognized as a holistic management approach that promotes business effectiveness and efficiency. Increasingly, corporates find themselves, operating in business environments filled with unpredictable, complex and continuous change. Driven by these dynamic competitive conditions, they look for a dynamic management of their business processes to maintain their processes performance. To be competitive, companies hav...