WorldWideScience

Sample records for configuration management process

  1. NCCDS configuration management process improvement

    Science.gov (United States)

    Shay, Kathy

    1993-01-01

    By concentrating on defining and improving specific Configuration Management (CM) functions, processes, procedures, personnel selection/development, and tools, internal and external customers received improved CM services. Job performance within the section increased in both satisfaction and output. Participation in achieving major improvements has led to the delivery of consistent quality CM products as well as significant decreases in every measured CM metrics category.

  2. Configuration Management Process Assessment Strategy

    Science.gov (United States)

    Henry, Thad

    2014-01-01

    Purpose: To propose a strategy for assessing the development and effectiveness of configuration management systems within Programs, Projects, and Design Activities performed by technical organizations and their supporting development contractors. Scope: Various entities CM Systems will be assessed dependent on Project Scope (DDT&E), Support Services and Acquisition Agreements. Approach: Model based structured against assessing organizations CM requirements including best practices maturity criteria. The model is tailored to the entity being assessed dependent on their CM system. The assessment approach provides objective feedback to Engineering and Project Management of the observed CM system maturity state versus the ideal state of the configuration management processes and outcomes(system). center dot Identifies strengths and risks versus audit gotcha's (findings/observations). center dot Used "recursively and iteratively" throughout program lifecycle at select points of need. (Typical assessments timing is Post PDR/Post CDR) center dot Ideal state criteria and maturity targets are reviewed with the assessed entity prior to an assessment (Tailoring) and is dependent on the assessed phase of the CM system. center dot Supports exit success criteria for Preliminary and Critical Design Reviews. center dot Gives a comprehensive CM system assessment which ultimately supports configuration verification activities.*

  3. Configuration and Data Management Process and the System Safety Professional

    Science.gov (United States)

    Shivers, Charles Herbert; Parker, Nelson C. (Technical Monitor)

    2001-01-01

    This article presents a discussion of the configuration management (CM) and the Data Management (DM) functions and provides a perspective of the importance of configuration and data management processes to the success of system safety activities. The article addresses the basic requirements of configuration and data management generally based on NASA configuration and data management policies and practices, although the concepts are likely to represent processes of any public or private organization's well-designed configuration and data management program.

  4. Configuration Management

    International Nuclear Information System (INIS)

    Morcos, A.; Taylor, H. S.

    1989-01-01

    This paper will briefly discuss the reason for and content of configuration management both for new plants and, when adapted, for older plants. It will then address three types of activities a utility may undertake as part of a nuclear CAM program and with which Sargent and Leyden has been actively involved. The first activity is a methodology for preparing design-basis documentation. The second is the identification of essential data required to be kept by the utility in support of the operation of a nuclear plant. The third activity is a computerized classification system of plant components, allowing ready identification of plant functional and physical characteristics. Plant configuration documentation describes plant components, the ways they arranged to interact, and the ways they are enabled to interact. Configuration management, on the other hand, is more than the control of such documentation. It is a dynamic process for ensuring that a plant configuration meets all relevant requirements for safety and economy, even while the configuration changes and even while the requirements change. Configuration management for a nuclear plant is so complex that it must be implemented in phases and modules. It takes advantage of and integrates existing programs. Managing complexity and streamlining the change process become important additional objectives of configuration management. The example activities fulfill essential goals of an overall CAM program: definition of design baseline, definition of essential plant data, and classification of plant components

  5. Software control and system configuration management - A process that works

    Science.gov (United States)

    Petersen, K. L.; Flores, C., Jr.

    1983-01-01

    A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.

  6. Configuration management

    International Nuclear Information System (INIS)

    Beavers, R.R.; Sumiec, K.F.

    1989-01-01

    Increasing regulatory and industry attention has been focused on properly controlling electrical design changes. These changes can be controlled by using configuration management techniques. Typically, there are ongoing modifications to various process systems or additions due to new requirements at every power plant. Proper control of these changes requires that an organized method be used to ensure that all important parameters of the electrical auxiliary systems are analyzed and that these parameters are evaluated accurately. This process, commonly referred to as configuration management, is becoming more important on both fossil and nuclear plants. Recent NRC- and utility-initiated inspections have identified problems due to incomplete analysis of changes to electrical auxiliary systems at nuclear stations

  7. Configuration management at NEK

    International Nuclear Information System (INIS)

    Podhraski, M.

    1999-01-01

    Configuration Management (CM) objectives at NEK are to ensure consistency between Design Requirements, Physical Plant Configuration and Configuration Information. Software applications, supporting Design Change, Work Control and Document Control Processes, are integrated in one module-oriented Management Information System (MIS). Master Equipment Component List (MECL) database is central MIS module. Through a combination of centralized database and process migrated activities it is ensured that the CM principles and requirements (accurate, current design data matching plant's physical configuration while complying to applicable requirements), are followed and fulfilled.(author)

  8. HLT configuration management system

    CERN Document Server

    Daponte, Vincenzo

    2015-01-01

    The CMS High Level Trigger (HLT) is implemented running a streamlined version of the CMS offline reconstruction software running on thousands of CPUs. The CMS software is written mostly in C++, using Python as its configuration language through an embedded CPython interpreter. The configuration of each process is made up of hundreds of modules, organized in sequences and paths. As an example, the HLT configurations used for 2011 data taking comprised over 2200 different modules, organized in more than 400 independent trigger paths. The complexity of the HLT configurations and the large number of configuration produced require the design of a suitable data management system. The present work describes the designed solution to manage the considerable number of configurations developed and to assist the editing of new configurations. The system is required to be remotely accessible and OS-independent as well as easly maintainable easy to use. To meet these requirements a three-layers architecture has been choose...

  9. Establishment of Systematic Design Control/Configuration Management Processes to Enhance Engineering Capability

    International Nuclear Information System (INIS)

    Inagaki, T.; Hamada, T.; Ihara, T.

    2016-01-01

    Full text: After the accident of Fukushima Daiichi Nuclear Power Plant in 2011, Tokyo Electric Power Company (TEPCO) launched various measures to enhance plant safety and safety culture of its employees. One of the important aspects of these measures is to enhance engineering capability and TEPCO is conducting actions to establish systematic design control and configuration management processes as an important foundation of such engineering capability. This paper describes how TEPCO is establishing systematic configuration management processes from three aspects, i.e., design requirement and bases management, facility configuration control, and configuration change management. It also provides brief information of the IT systems that are being introduced and will support the systematic design control and configuration management processes. (author

  10. Implementation of Software Configuration Management Process by Models: Practical Experiments and Learned Lessons

    Directory of Open Access Journals (Sweden)

    Bartusevics Arturs

    2014-12-01

    Full Text Available Nowadays software configuration management process is not only dilemma which system should be used for version control or how to merge changes from one source code branch to other. There are multiple tasks such as version control, build management, deploy management, status accounting, bug tracking and many others that should be solved to support full configuration management process according to most popular quality standards. The main scope of the mentioned process is to include only valid and tested software items to final version of product and prepare a new version as soon as possible. To implement different tasks of software configuration management process, a set of different tools, scripts and utilities should be used. The current paper provides a new model-based approach to implementation of configuration management. Using different models, a new approach helps to organize existing solutions and develop new ones by a parameterized way, thus increasing reuse of solutions. The study provides a general description of new model-based conception and definitions of all models needed to implement a new approach. The second part of the paper contains an overview of criteria, practical experiments and lessons learned from using new models in software configuration management. Finally, further works are defined based on results of practical experiments and lessons learned.

  11. Software configuration management

    International Nuclear Information System (INIS)

    Arribas Peces, E.; Martin Faraldo, P.

    1993-01-01

    Software Configuration Management is directed towards identifying system configuration at specific points of its life cycle, so as to control changes to the configuration and to maintain the integrity and traceability of the configuration throughout its life. SCM functions and tasks are presented in the paper

  12. Software configuration management

    CERN Document Server

    Keyes, Jessica

    2004-01-01

    Software Configuration Management discusses the framework from a standards viewpoint, using the original DoD MIL-STD-973 and EIA-649 standards to describe the elements of configuration management within a software engineering perspective. Divided into two parts, the first section is composed of 14 chapters that explain every facet of configuration management related to software engineering. The second section consists of 25 appendices that contain many valuable real world CM templates.

  13. Configuration Management Program Plan

    International Nuclear Information System (INIS)

    1991-01-01

    Westinghouse Savannah River Company (WSRC) has established a configuration management (CM) plan to execute the SRS CM Policy and the requirements of the DOE Order 4700.1. The Reactor Restart Division (RRD) has developed its CM Plan under the SRS CM Program and is implementing it via the RRD CM Program Plan and the Integrated Action Plan. The purpose of the RRD CM program is to improve those processes which are essential to the safe and efficient operation of SRS production reactors. This document provides details of this plan

  14. Computer software configuration management

    International Nuclear Information System (INIS)

    Pelletier, G.

    1987-08-01

    This report reviews the basic elements of software configuration management (SCM) as defined by military and industry standards. Several software configuration management standards are evaluated given the requirements of the nuclear industry. A survey is included of available automated tools for supporting SCM activities. Some information is given on the experience of establishing and using SCM plans of other organizations that manage critical software. The report concludes with recommendations of practices that would be most appropriate for the nuclear power industry in Canada

  15. Configuration Management (CM) Support for KM Processes at NASA/Johnson Space Center (JSC)

    Science.gov (United States)

    Cioletti, Louis

    2010-01-01

    Collection and processing of information are critical aspects of every business activity from raw data to information to an executable decision. Configuration Management (CM) supports KM practices through its automated business practices and its integrated operations within the organization. This presentation delivers an overview of JSC/Space Life Sciences Directorate (SLSD) and its methods to encourage innovation through collaboration and participation. Specifically, this presentation will illustrate how SLSD CM creates an embedded KM activity with an established IT platform to control and update baselines, requirements, documents, schedules, budgets, while tracking changes essentially managing critical knowledge elements.

  16. Business Model Process Configurations

    DEFF Research Database (Denmark)

    Taran, Yariv; Nielsen, Christian; Thomsen, Peter

    2015-01-01

    , by developing (inductively) an ontological classification framework, in view of the BM process configurations typology developed. Design/methodology/approach – Given the inconsistencies found in the business model studies (e.g. definitions, configurations, classifications) we adopted the analytical induction...

  17. Ansible configuration management

    CERN Document Server

    Hall, Daniel

    2013-01-01

    Ansible Configuration Management"" is a step-by-step tutorial that teaches the use of Ansible for configuring Linux machines.This book is intended for anyone looking to understand the basics of Ansible. It is expected that you will have some experience of how to set up and configure Linux machines. In parts of the book we cover configuration files of BIND, MySQL, and other Linux daemons, therefore a working knowledge of these would be helpful but are certainly not required.

  18. Drupal 8 configuration management

    CERN Document Server

    Borchert, Stefan

    2015-01-01

    Drupal 8 Configuration Management is intended for people who use Drupal 8 to build websites, whether you are a hobbyist using Drupal for the first time, a long-time Drupal site builder, or a professional web developer.

  19. Configuration Management Automation (CMA) -

    Data.gov (United States)

    Department of Transportation — Configuration Management Automation (CMA) will provide an automated, integrated enterprise solution to support CM of FAA NAS and Non-NAS assets and investments. CMA...

  20. Belene NPP project configuration management

    International Nuclear Information System (INIS)

    Matveev, A.

    2009-01-01

    The configuration management includes: change identification; change assessment; change coordination; change approval or rejection; Change introduction. One of the main tasks while implementing the above processes is the analysis of the effect of one change upon all the related elements

  1. Implementation of a configurable laboratory information management system for use in cellular process development and manufacturing.

    Science.gov (United States)

    Russom, Diana; Ahmed, Amira; Gonzalez, Nancy; Alvarnas, Joseph; DiGiusto, David

    2012-01-01

    Regulatory requirements for the manufacturing of cell products for clinical investigation require a significant level of record-keeping, starting early in process development and continuing through to the execution and requisite follow-up of patients on clinical trials. Central to record-keeping is the management of documentation related to patients, raw materials, processes, assays and facilities. To support these requirements, we evaluated several laboratory information management systems (LIMS), including their cost, flexibility, regulatory compliance, ongoing programming requirements and ability to integrate with laboratory equipment. After selecting a system, we performed a pilot study to develop a user-configurable LIMS for our laboratory in support of our pre-clinical and clinical cell-production activities. We report here on the design and utilization of this system to manage accrual with a healthy blood-donor protocol, as well as manufacturing operations for the production of a master cell bank and several patient-specific stem cell products. The system was used successfully to manage blood donor eligibility, recruiting, appointments, billing and serology, and to provide annual accrual reports. Quality management reporting features of the system were used to capture, report and investigate process and equipment deviations that occurred during the production of a master cell bank and patient products. Overall the system has served to support the compliance requirements of process development and phase I/II clinical trial activities for our laboratory and can be easily modified to meet the needs of similar laboratories.

  2. Secure Software Configuration Management Processes for nuclear safety software development environment

    International Nuclear Information System (INIS)

    Chou, I.-Hsin

    2011-01-01

    Highlights: → The proposed method emphasizes platform-independent security processes. → A hybrid process based on the nuclear SCM and security regulations is proposed. → Detailed descriptions and Process Flow Diagram are useful for software developers. - Abstract: The main difference between nuclear and generic software is that the risk factor is infinitely greater in nuclear software - if there is a malfunction in the safety system, it can result in significant economic loss, physical damage or threat to human life. However, secure software development environment have often been ignored in the nuclear industry. In response to the terrorist attacks on September 11, 2001, the US Nuclear Regulatory Commission (USNRC) revised the Regulatory Guide (RG 1.152-2006) 'Criteria for use of computers in safety systems of nuclear power plants' to provide specific security guidance throughout the software development life cycle. Software Configuration Management (SCM) is an essential discipline in the software development environment. SCM involves identifying configuration items, controlling changes to those items, and maintaining integrity and traceability of them. For securing the nuclear safety software, this paper proposes a Secure SCM Processes (S 2 CMP) which infuses regulatory security requirements into proposed SCM processes. Furthermore, a Process Flow Diagram (PFD) is adopted to describe S 2 CMP, which is intended to enhance the communication between regulators and developers.

  3. Configuration management theory, practice, and application

    CERN Document Server

    Quigley, Jon M

    2015-01-01

    Configuration Management: Theory, Practice, and Application details a comprehensive approach to configuration management from a variety of product development perspectives, including embedded and IT. It provides authoritative advice on how to extend products for a variety of markets due to configuration options. The book also describes the importance of configuration management to other parts of the organization. It supplies an overview of configuration management and its process elements to provide readers with a contextual understanding of the theory, practice, and application of CM. Explaining what a configuration item is and what it implies, the book illustrates the interplay of configuration and data management with all enterprise resources during each phase of a product lifecycle. It also demonstrates the interrelationship of CM to functional resources. Shedding light on current practice, the book describes CM baselines, configuration identification, management baseline changes, and acceptance criteria ...

  4. Simulator configuration management system

    International Nuclear Information System (INIS)

    Faulent, J.; Brooks, J.G.

    1990-01-01

    The proposed revisions to ANS 3.5-1985 (Section 5) require Utilities to establish a simulator Configuration Management System (CMS). The proposed CMS must be capable of: Establishing and maintaining a simulator design database. Identifying and documenting differences between the simulator and its reference plant. Tracking the resolution of identified differences. Recording data to support simulator certification, testing and maintenance. This paper discusses a CMS capable of meeting the proposed requirements contained in ANS 3.5. The system will utilize a personal computer and a relational database management software to construct a simulator design database. The database will contain records to all reference nuclear plant data used in designing the simulator, as well as records identifying all the software, hardware and documentation making up the simulator. Using the relational powers of the database management software, reports will be generated identifying the impact of reference plant changes on the operation of the simulator. These reports can then be evaluated in terms of training needs to determine if changes are required for the simulator. If a change is authorized, the CMS will track the change through to its resolution and then incorporate the change into the simulator design database

  5. SRP [Salt Repository Project] configuration management plan

    International Nuclear Information System (INIS)

    1987-01-01

    This configuration management plan describes the organization, policies, and procedures that will be used on the Salt Repository Project (SRP) to implement the configuration management disciplines and controls. Configuration management is a part of baseline management. Baseline management is defined in the SRP Baseline Procedures Notebook and also includes cost and schedule baselines. Configuration management is a discipline applying technical and administrative direction and surveillance to identify and document the functional and physical characteristics of an item, to control changes to those characteristics, to record and report change processing and implementation status, and to audit the results. Configuration management is designed as a project management tool to determine and control baselines, and ensure and document all components of a project interface both physically and functionally. The purpose is to ensure that the product acquired satisfies the project's technical and operational requirements, and that the technical requirements are clearly defined and controlled throughout the development and acquisition process. 5 figs

  6. Ansible configuration management

    CERN Document Server

    Hall, Daniel

    2015-01-01

    This book is intended for anyone who wants to learn Ansible starting from the basics. Some experience of how to set up and configure Linux machines and a working knowledge of BIND, MySQL, and other Linux daemons is expected.

  7. A Software Configuration Management Course

    DEFF Research Database (Denmark)

    Asklund, U.; Bendix, Lars Gotfred

    2003-01-01

    Software Configuration Management has been a big success in research and creation of tools. There are also many vendors in the market of selling courses to companies. However, in the education sector Software Configuration Management has still not quite made it - at least not into the university...... curriculum. It is either not taught at all or is just a minor part of a general course in software engineering. In this paper, we report on our experience with giving a full course entirely dedicated to Software Configuration Management topics and start a discussion of what ideally should be the goal...

  8. Configuration Management Plan for K Basins

    International Nuclear Information System (INIS)

    Weir, W.R.; Laney, T.

    1995-01-01

    This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Programclose quotes

  9. Configuration Management Fundamentals

    National Research Council Canada - National Science Library

    2005-01-01

    The U.S. Air Force's Software Technology Support Center offers an updated and condensed version of the "Guidelines for Successful Acquisition and Management of Software-Intensive Systems" (GSAM) on its Web site...

  10. Device configuration-management system

    International Nuclear Information System (INIS)

    Nowell, D.M.

    1981-01-01

    The Fusion Chamber System, a major component of the Magnetic Fusion Test Facility, contains several hundred devices which report status to the Supervisory Control and Diagnostic System for control and monitoring purposes. To manage the large number of diversity of devices represented, a device configuration management system was required and developed. Key components of this software tool include the MFTF Data Base; a configuration editor; and a tree structure defining the relationships between the subsystem devices. This paper will describe how the configuration system easily accomodates recognizing new devices, restructuring existing devices, and modifying device profile information

  11. Intellectual Model-Based Configuration Management Conception

    Directory of Open Access Journals (Sweden)

    Bartusevics Arturs

    2014-07-01

    Full Text Available Software configuration management is one of the most important disciplines within the software development project, which helps control the software evolution process and allows including into the end project only tested and validated changes. To achieve this, software management completes certain tasks. Concrete tools are used for technical implementation of tasks, such as version control systems, servers of continuous integration, compilers, etc. A correct configuration management process usually requires several tools, which mutually exchange information by generating various kinds of transfers. When it comes to introducing the configuration management process, often there are situations when tool installation is started, yet at that given moment there is no general picture of the total process. The article offers a model-based configuration management concept, which foresees the development of an abstract model for the configuration management process that later is transformed to lower abstraction level models and tools are indicated to support the technical process. A solution of this kind allows a more rational introduction and configuration of tools

  12. National Ignition Facility Configuration Management Plan

    International Nuclear Information System (INIS)

    Cabral, S G; Moore, T L

    2002-01-01

    This Configuration Management Plan (CMP) describes the technical and administrative management process for controlling the National Ignition Facility (NIF) Project configuration. The complexity of the NIF Project (i.e., participation by multiple national laboratories and subcontractors involved in the development, fabrication, installation, and testing of NIF hardware and software, as well as construction and testing of Project facilities) requires implementation of the comprehensive configuration management program defined in this plan. A logical schematic illustrating how the plan functions is provided in Figure 1. A summary of the process is provided in Section 4.0, Configuration Change Control. Detailed procedures that make up the overall process are referenced. This CMP is consistent with guidance for managing a project's configuration provided in Department of Energy (DOE) Order 430.1, Guide PMG 10, ''Project Execution and Engineering Management Planning''. Configuration management is a formal discipline comprised of the following four elements: (1) Identification--defines the functional and physical characteristics of a Project and uniquely identifies the defining requirements. This includes selection of components of the end product(s) subject to control and selection of the documents that define the project and components. (2) Change management--provides a systematic method for managing changes to the project and its physical and functional configuration to ensure that all changes are properly identified, assessed, reviewed, approved, implemented, tested, and documented. (3) Data management--ensures that necessary information on the project and its end product(s) is systematically recorded and disseminated for decision-making and other uses. Identifies, stores and controls, tracks status, retrieves, and distributes documents. (4) Assessments and validation--ensures that the planned configuration requirements match actual physical configurations and

  13. Configuration Management at NASA

    Science.gov (United States)

    Doreswamy, Rajiv

    2013-01-01

    NASA programs are characterized by complexity, harsh environments and the fact that we usually have one chance to get it right. Programs last decades and need to accept new hardware and technology as it is developed. We have multiple suppliers and international partners Our challenges are many, our costs are high and our failures are highly visible. CM systems need to be scalable, adaptable to new technology and span the life cycle of the program (30+ years). Multiple Systems, Contractors and Countries added major levels of complexity to the ISS program and CM/DM and Requirements management systems center dot CM Systems need to be designed for long design life center dot Space Station Design started in 1984 center dot Assembly Complete in 2012 center dot Systems were developed on a task basis without an overall system perspective center dot Technology moves faster than a large project office, try to make sure you have a system that can adapt

  14. Data from configuration management tools as sources for software process mining

    NARCIS (Netherlands)

    Trienekens, J.J.M.; Kusters, R.J.; Samalik, J.; Weijters, A.J.M.M.; Lavazza, L; Oberhauser, R; Martin, A; Hassine, J; Gebhart, M; Jäntti, M

    2013-01-01

    Process mining has proven to be a valuable approach that provides new and objective insights into processes within organizations. Based on sets of well-structured data, the underlying ‘actual’ processes can be extracted and process models can be constructed automatically, i.e., the process model can

  15. Configuration Management for Wendelstein 7-X

    International Nuclear Information System (INIS)

    Brakel, R.; Eeten, P.v.; Hartmann, D.A.; Henkelmann, K.; Knauer, J.; Mueller, K.; Okkenga-Wolf, A.; Wenzel, U.

    2009-01-01

    A complex system like the large superconducting Wendelstein 7-X stellarator necessitates a dedicated organizational structure which assures permanent consistency between the requirements of its system specification and the performance attributes of all its components throughout its life time. This includes well-defined processes and centrally coordinated information structures. For this purposes the department Configuration Management (CM) has recently been established at W7-X. The detailed tasks of CM for W7-X are oriented along common CM standards and comprise configuration identification, change management, configuration status accounting and configuration verification. While the assembly of W7-X is proceeding some components are still under procurement or even under design. Thus design changes and non-conformances may have a direct impact on the assembly process. Highest priority has therefore been assigned to efficient control of change and non-conformance processes which might delay the assembly schedule.

  16. Spent Nuclear Fuel Project Configuration Management Plan

    International Nuclear Information System (INIS)

    Reilly, M.A.

    1995-01-01

    This document is a rewrite of the draft ''C'' that was agreed to ''in principle'' by SNF Project level 2 managers on EDT 609835, dated March 1995 (not released). The implementation process philosphy was changed in keeping with the ongoing reengineering of the WHC Controlled Manuals to achieve configuration management within the SNF Project

  17. Microsoft System Center Configuration Manager

    CERN Document Server

    Sandbu, Marius

    2013-01-01

    This book is a step-by-step tutorial that guides you through the key steps in implementing best solutions for high availability and performance tuning. It is split into two distinct approaches: client and site side HA and optimization.Microsoft SCCM High Availability and Performance Tuning is for IT professionals and consultants working with Configuration Manager who wish to learn the skills to deploy a redundant and scalable solution.

  18. Configuration Management Issues at Research Reactors

    International Nuclear Information System (INIS)

    Morris, Charles R.

    2013-01-01

    Configuration Management (from IAEA TECDOC 1651): • The Main Functions of the configuration management process are to: • maintain design requirements of structures, systems and components; • track current as-built drawings, documents, and design basis library; • confirm design change packages demonstrate compliance to design basis in calculations, procurement, safety reviews, update of affected documents, and SSC data; • confirm work orders demonstrate compliance to mandated preventive maintenance; • surveillance, parts replacement and design change installation requirements; • demonstrate procurement of spare parts qualified to meet design basis for proper make, model and quality-level for the SSC location and form, fit and function

  19. Tank waste remediation system configuration management plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The configuration management program for the Tank Waste Remediation System (TWRS) Project Mission supports management of the project baseline by providing the mechanisms to identify, document, and control the functional and physical characteristics of the products. This document is one of the tools used to develop and control the mission and work. It is an integrated approach for control of technical, cost, schedule, and administrative information necessary to manage the configurations for the TWRS Project Mission. Configuration management focuses on five principal activities: configuration management system management, configuration identification, configuration status accounting, change control, and configuration management assessments. TWRS Project personnel must execute work in a controlled fashion. Work must be performed by verbatim use of authorized and released technical information and documentation. Application of configuration management will be consistently applied across all TWRS Project activities and assessed accordingly. The Project Hanford Management Contract (PHMC) configuration management requirements are prescribed in HNF-MP-013, Configuration Management Plan (FDH 1997a). This TWRS Configuration Management Plan (CMP) implements those requirements and supersedes the Tank Waste Remediation System Configuration Management Program Plan described in Vann, 1996. HNF-SD-WM-CM-014, Tank Waste Remediation System Configuration Management Implementation Plan (Vann, 1997) will be revised to implement the requirements of this plan. This plan provides the responsibilities, actions and tools necessary to implement the requirements as defined in the above referenced documents

  20. Hanford Environmental Information System Configuration Management Plan

    International Nuclear Information System (INIS)

    1996-06-01

    The Hanford Environmental Information System (HEIS) Configuration Management Plan establishes the software and data configuration control requirements for the HEIS and project-related databases maintained within the Environmental Restoration Contractor's data management department

  1. Configuration Management Plan for the Tank Farm Contractor

    Energy Technology Data Exchange (ETDEWEB)

    WEIR, W.R.

    2000-04-21

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments.

  2. Configuration Management Plan for the Tank Farm Contractor

    International Nuclear Information System (INIS)

    WEIR, W.R.

    2000-01-01

    The Configuration Management Plan for the Tank Farm Contractor describes configuration management the contractor uses to manage and integrate its technical baseline with the programmatic and functional operations to perform work. The Configuration Management Plan for the Tank Farm Contractor supports the management of the project baseline by providing the mechanisms to identify, document, and control the technical characteristics of the products, processes, and structures, systems, and components (SSC). This plan is one of the tools used to identify and provide controls for the technical baseline of the Tank Farm Contractor (TFC). The configuration management plan is listed in the management process documents for TFC as depicted in Attachment 1, TFC Document Structure. The configuration management plan is an integrated approach for control of technical, schedule, cost, and administrative processes necessary to manage the mission of the TFC. Configuration management encompasses the five functional elements of: (1) configuration management administration, (2) configuration identification, (3) configuration status accounting, (4) change control, and (5 ) configuration management assessments

  3. Code organization and configuration management

    International Nuclear Information System (INIS)

    Wellisch, J.P.; Ashby, S.; Williams, C.; Osborne, I.

    2001-01-01

    Industry experts are increasingly focusing on team productivity as the key to success. The base of the team effort is the four-fold structure of software in terms of logical organisation, physical organisation, managerial organisation, and dynamical structure. The authors describe the ideas put into action within the CMS software for organising software into sub-systems and packages, and to establish configuration management in a multi-project environment. The authors use a structure that allows to maximise the independence of software development in individual areas, and at the same time emphasises the overwhelming importance of the interdependencies between the packages and components in the system. The authors comment on release procedures, and describe the inter-relationship between release, development, integration, and testing

  4. Example of software configuration management model

    International Nuclear Information System (INIS)

    Roth, P.

    2006-01-01

    Software configuration management is the mechanism used to track and control software changes and may include the following actions: A tracking system should be established for any changes made to the existing software configuration. Requirement of the configuration management system are the following: - Backup the different software configuration; - Record the details (the date, the subject, the filenames, the supporting documents, the tests, ...) of the changes introduced in the new configuration; - Document all the differences between the different versions. Configuration management allows simultaneous exploitation of one specific version and development of the next version. Minor correction can be perform in the current exploitation version

  5. A PBOM configuration and management method based on templates

    Science.gov (United States)

    Guo, Kai; Qiao, Lihong; Qie, Yifan

    2018-03-01

    The design of Process Bill of Materials (PBOM) holds a hinge position in the process of product development. The requirements of PBOM configuration design and management for complex products are analysed in this paper, which include the reuse technique of configuration procedure and urgent management need of huge quantity of product family PBOM data. Based on the analysis, the function framework of PBOM configuration and management has been established. Configuration templates and modules are defined in the framework to support the customization and the reuse of configuration process. The configuration process of a detection sensor PBOM is shown as an illustration case in the end. The rapid and agile PBOM configuration and management can be achieved utilizing template-based method, which has a vital significance to improve the development efficiency for complex products.

  6. Some aspects of configuration management at Nuclear Power Plant Krsko

    International Nuclear Information System (INIS)

    Heruc, Z.; Podhraski, M.

    2000-01-01

    Configuration Management (CM) objectives at Neck are to ensure consistency between Design Requirements, Physical Plant Configuration and Configuration Information. Software applications, supporting Design Change, Work Control and Document Control Processes, are integrated in one module-oriented Management Information System (MIS). From configuration management perspective, Master Equipment Component List (MECL) database is the central MIS module. Through a combination of a centralized database and process migrated activities (modifications, plant operation, maintenance, document control etc.), it is encored that the CM principles and requirements (accurate, current design dana matching plant's physical configuration while complying to applicable requirements), are followed and fulfilled. (author)

  7. System engineering and configuration management in ITER

    International Nuclear Information System (INIS)

    Chiocchio, S.; Martin, E.; Barabaschi, P.; Bartels, Hans Werner; How, J.; Spears, W.

    2007-01-01

    The construction of ITER will represent a major challenge for the fusion community at large, because of the intrinsic complexity of the tokamak design, the large number of different systems which are all essential for its operation, the worldwide distribution of the design activities and the unusual procurement scheme based on a combination of in-kind and directly funded deliverables. A key requirement for the success of such a large project is that a systematic approach to ensure the consistency of the design with the required performance is adopted. Also, effective project management methods, tools and working practices must be deployed to facilitate the communication and collaboration among the institutions and industries involved in the project. The authors have been involved in the definition and practical implementation of the design integration and configuration control structure inside ITER and in the system engineering process during the selection and optimization of the machine configuration. In parallel, they have assessed design, drawing and documentation management software to be used for the construction phase. Here, they describe the experience gained in recent years, explain the drivers behind the selection of the documents and drawings management systems, and illustrate the scope and issues of the configuration management activities to ensure the congruence of the design, to control and track the design changes and to manage the interfaces among the ITER systems

  8. Microsoft System Center Configuration Manager advanced deployment

    CERN Document Server

    Coupland, Martyn

    2014-01-01

    If you are an experienced Configuration Manager administrator looking to advance your career or get more from your current environment, then this book is ideal for you. Prior experience of deploying and managing a Configuration Manager site would be helpful in following the examples throughout this book.

  9. Evolution of an approach to configuration management

    International Nuclear Information System (INIS)

    Bowes, E.V.

    1988-01-01

    Virginia Power is currently in the process of developing and implementing an automated Equipment Data System/Bill of Materials (EDS/BOM) which will support many aspects of maintenance management, including planning, component tracking, materials management and historical reporting. The EDS/BOM system is being developed as an application of a comprehensive automated Work Planning and Tracking System (WPTS) which has become the main system for use in station maintenance management. In addition to these programs, the Company has also developed a Cost Planning and Tracking System (CPTS) and has invested over $20 million in an equipment mark numbering and drawing update program. As these programs have matured, the need has been recognized for a structured configuration management program to protect the multi-million dollar investment in documents and data, and to assure the existence of reliable information as a foundation for improved efficiency in maintenance management and engineering

  10. The Ragnarok Architectural Software Configuration Management Model

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak

    1999-01-01

    The architecture is the fundamental framework for designing and implementing large scale software, and the ability to trace and control its evolution is essential. However, many traditional software configuration management tools view 'software' merely as a set of files, not as an architecture....... This introduces an unfortunate impedance mismatch between the design domain (architecture level) and configuration management domain (file level.) This paper presents a software configuration management model that allows tight version control and configuration management of the architecture of a software system...

  11. Configuration management: Phase II implementation guidance

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-01

    Configuration management (CM) is essential to maintaining an acceptable level of risk to the public, workers, environment, or mission success. It is a set of activities and techniques used to maintain consistency among physical and functional configuration, applicable requirements, and key documents. This document provides guidance for continuing the implementation of CM in a phased and graded manner. It describes a cost-effective approach to documented consistency with requirements, with early emphasis on items most important to safety and environmental protection. It is intended to help responsible line managers and configuration management staff personnel in meeting the Energy Systems configuration management policy standard.

  12. Configuration management in nuclear power plants

    CERN Document Server

    2003-01-01

    Configuration management (CM) is the process of identifying and documenting the characteristics of a facility's structures, systems and components of a facility, and of ensuring that changes to these characteristics are properly developed, assessed, approved, issued, implemented, verified, recorded and incorporated into the facility documentation. The need for a CM system is a result of the long term operation of any nuclear power plant. The main challenges are caused particularly by ageing plant technology, plant modifications, the application of new safety and operational requirements, and in general by human factors arising from migration of plant personnel and possible human failures. The IAEA Incident Reporting System (IRS) shows that on average 25% of recorded events could be caused by configuration errors or deficiencies. CM processes correctly applied ensure that the construction, operation, maintenance and testing of a physical facility are in accordance with design requirements as expressed in the d...

  13. Configuration Management for eXtreme Programming

    DEFF Research Database (Denmark)

    Asklund, U.; Bendix, Lars Gotfred; Ekman, T.

    2003-01-01

    Extreme programming (XP) is a software development method that prescribes the use of 12 different practices. Four of these practices (collective code ownership, continuous integration, small releases and refactoring) can indeed be given good support by the use of simple configuration management (CM......) techniques. We report on our experience in providing many groups of novice developers with CM education, processes and tools to support the four CM-related XP practices in their projects. True to the spirit of XP both education and processes are very lightweight and we found that it was sufficient to focus...

  14. Improving the quotation process with product configuration

    DEFF Research Database (Denmark)

    Hvam, Lars; Christensen, Simon Pape

    2006-01-01

    How can product configuration support the process of engineering highly complex industrial products? This article describes how an IT-based product configuration system was developed to support the process of mak-ing budget quotations. The article is based on a research project carried out...

  15. Design knowledge management using configuration manager

    International Nuclear Information System (INIS)

    Kang, Mu Jin; Jung, Seung Hwan

    2000-01-01

    It is known that about 15 to 40 percent of total design time is spent on retrieving information such as standard parts, handbook data, engineering equations, previous designs. This paper describes a knowledge management system for machine tool design. Product structuring, change management, and complex design knowledge management are possible through the developed system. The system can speed up the design process by making necessary data instantly available as it is needed and keeping of all the relevant design information and knowledge including individual decisions, design intentions, documents, and drawings

  16. Software Configuration Management: The Quality Weakness

    International Nuclear Information System (INIS)

    Arrojo, E.; Garcia, P.

    1998-01-01

    At the moment it is very difficult to din any process in the industry where software is not involved. We trust software does minimize the possibility of process failures. In parallel, the quality and safety requirements of our processes have been improved to satisfactory levels. Let's look around us. Every day, thousands of calculations are carried out by our engineers using computer programs. Hundreds of processes are controlled automatically. Safety marging, limits, operation controls..., are derived from them. The tools begin to control our processes but, Who does control the tool? Once they have been installed and once they are running, are they always reliable? NO If you think that your current system are satisfactory, we propose you a game in this report. It is just a test. Which is your score?. Then we revise the concept of Configuration Management and we describe an ideal machine; the ''Perpetuum Mobile'' of the Configuration. We describe some rules to implement and improvement and we comment on the operative experience in ENUSA. (Author)

  17. Configuration management in nuclear power plants

    International Nuclear Information System (INIS)

    2003-01-01

    Configuration management (CM) is the process of identifying and documenting the characteristics of a facility's structures, systems and components of a facility, and of ensuring that changes to these characteristics are properly developed, assessed, approved, issued, implemented, verified, recorded and incorporated into the facility documentation. The need for a CM system is a result of the long term operation of any nuclear power plant. The main challenges are caused particularly by ageing plant technology, plant modifications, the application of new safety and operational requirements, and in general by human factors arising from migration of plant personnel and possible human failures. The IAEA Incident Reporting System (IRS) shows that on average 25% of recorded events could be caused by configuration errors or deficiencies. CM processes correctly applied ensure that the construction, operation, maintenance and testing of a physical facility are in accordance with design requirements as expressed in the design documentation. An important objective of a configuration management program is to ensure that accurate information consistent with the physical and operational characteristics of the power plant is available in a timely manner for making safe, knowledgeable, and cost effective decisions with confidence. Currently, the nuclear industry and governmental organizations are showing an increasing interest in the implementation of this process as an effective way of limiting configuration errors and related risks. In this report the necessary attributes of a good operational CM are identified. It is recognized and emphasized that a CM is one aspect of the overall management system. Nevertheless, this is an important part of managerial activity focused on the compliance of knowledge of the plant personnel, plant documentation and records with the state of the plant technology. The concepts developed in this report present a basic approach to CM, taking into

  18. Configuration Management Program - a part of Integrated Management System

    International Nuclear Information System (INIS)

    Mancev, Bogomil; Yordanova, Vanja; Nenkova, Boyka

    2014-01-01

    The recently issued International Atomic Energy Agency (IAEA) publications (GS-R-3, GS-G-3.1 and GS-G-3.5) regarding Management Systems for Facilities and Activities define requirements for creation, introduction, evaluation and continuously improvement of the Management System, which unifies the safety, health, environment, security, quality and economic elements. According to GS-R-3 the Integrated Management System is based on defined processes identified in the enterprises: Managing, Basic and Supporting processes. At implementation of their activities, the organizations often apply other standards in their interrelations with suppliers and the parties concerned - ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007, regarding quality, environment and occupational health and safety management. The integration of the standards of both series ensure the observance of the common management principles that reflect the best practices of management as leadership, participation of the people, process approach, continuously improvement, systematical approach to the management and approach based on facts used at the making decisions. The main objective of the Integrated Management System introduction is to ensure safety considering the influence of all additional impacts taken together. The Integrated Management System is based on the process approach at implementation of the activities in nuclear power plant. The transition to the process oriented approach require long period of time, during which the distribution of the responsibilities is optimized up to the level that will satisfy the requirements, reach and maintain the stipulated objectives. The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained and maintained during the entire life cycle of the facility. Processes within configuration management are not isolated, but are part of

  19. Configuration management of the EU DEMO conceptual design data

    International Nuclear Information System (INIS)

    Meszaros, Botond; Shannon, Mark; Marzullo, Domenico; Woodley, Colin; Rowe, Steve; Di Gironimo, Giuseppe

    2016-01-01

    Highlights: • Description of the selection of the DEMO Product Data Management tool. • Introduction of the DEMO configuration management philosophy for the CAD design data. • Description of the enabling tools and systems of the configuration management. - Abstract: The EUROfusion Consortium is setting up – as part of the EU Fusion Roadmap – the framework for the implementation of the (pre)conceptual design phase of the DEMO reactor. Configuration management needs have been identified as one of the key elements of this framework and is the topic of this paper, in particular the configuration of the CAD design data. The desire is to keep the definition and layout of the corresponding systems “light weight” and relatively easy to manage, whilst simultaneously providing a level of detail in the definition of the design configuration that is fit for the purpose of a conceptual design. This paper aims to describe the steps followed during the definition of the configuration management system of the DEMO design data in terms of (i) the identification of the appropriate product data management system, (ii) the description of the philosophy of the configuration management of the design data, and (iii) the introduction of the most important enabling processes.

  20. Configuration management of the EU DEMO conceptual design data

    Energy Technology Data Exchange (ETDEWEB)

    Meszaros, Botond; Shannon, Mark [EUROfusion Consortium, PPPT Department, Garching, Boltzmannstr. 2 (Germany); Marzullo, Domenico [CREATE, University of Naples Federico II, P.le Tecchio 80, 80125 Napoli (Italy); Woodley, Colin; Rowe, Steve [CCFE, Culham Science Centre, Oxfordshire OX14 3DB, Abingdon (United Kingdom); Di Gironimo, Giuseppe [CREATE, University of Naples Federico II, P.le Tecchio 80, 80125 Napoli (Italy)

    2016-11-01

    Highlights: • Description of the selection of the DEMO Product Data Management tool. • Introduction of the DEMO configuration management philosophy for the CAD design data. • Description of the enabling tools and systems of the configuration management. - Abstract: The EUROfusion Consortium is setting up – as part of the EU Fusion Roadmap – the framework for the implementation of the (pre)conceptual design phase of the DEMO reactor. Configuration management needs have been identified as one of the key elements of this framework and is the topic of this paper, in particular the configuration of the CAD design data. The desire is to keep the definition and layout of the corresponding systems “light weight” and relatively easy to manage, whilst simultaneously providing a level of detail in the definition of the design configuration that is fit for the purpose of a conceptual design. This paper aims to describe the steps followed during the definition of the configuration management system of the DEMO design data in terms of (i) the identification of the appropriate product data management system, (ii) the description of the philosophy of the configuration management of the design data, and (iii) the introduction of the most important enabling processes.

  1. Mastering System Center 2012 Configuration Manager

    CERN Document Server

    Rachui, Steve; Martinez, Santos; Daalmans, Peter

    2012-01-01

    Expert coverage of Microsoft's highly anticipated network software deployment tool The latest version of System Center Configuration Manager (SCCM) is a dramatic update of its predecessor Configuration Manager 2007, and this book offers intermediate-to-advanced coverage of how the new SCCM boasts a simplified hierarchy, role-based security, a new console, flexible application deployment, and mobile management. You'll explore planning and installation, migrating from SCCM 2007, deploying software and operating systems, security, monitoring and troubleshooting, and automating and customizing SCC

  2. Configurable multi-perspective business process models

    NARCIS (Netherlands)

    La Rosa, M.; Dumas, M.; Hofstede, ter A.H.M.; Mendling, J.

    2011-01-01

    A configurable process model provides a consolidated view of a family of business processes. It promotes the reuse of proven practices by providing analysts with a generic modeling artifact from which to derive individual process models. Unfortunately, the scope of existing notations for

  3. Configuration management program plan for Hanford site systems engineering

    International Nuclear Information System (INIS)

    Hoffman, A.G.

    1994-01-01

    This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline

  4. Engineering Documentation Control Handbook Configuration Management and Product Lifecycle Management

    CERN Document Server

    Watts, Frank B

    2011-01-01

    In this new edition of his widely-used Handbook, Frank Watts, widely recognized for his significant contributions to engineering change control processes, provides a thoroughly practical guide to the implementation and improvement of Engineering Documentation Control (EDC), Product Lifecycle Management and Product Configuration Management (CM). Successful and error-free implementation of EDC/CM is critical to world-class manufacturing. Huge amounts of time are wasted in most product manufacturing environments over EDC/CM issues such as interchangeability, document release and change control -

  5. Configuration Management File Manager Developed for Numerical Propulsion System Simulation

    Science.gov (United States)

    Follen, Gregory J.

    1997-01-01

    One of the objectives of the High Performance Computing and Communication Project's (HPCCP) Numerical Propulsion System Simulation (NPSS) is to provide a common and consistent way to manage applications, data, and engine simulations. The NPSS Configuration Management (CM) File Manager integrated with the Common Desktop Environment (CDE) window management system provides a common look and feel for the configuration management of data, applications, and engine simulations for U.S. engine companies. In addition, CM File Manager provides tools to manage a simulation. Features include managing input files, output files, textual notes, and any other material normally associated with simulation. The CM File Manager includes a generic configuration management Application Program Interface (API) that can be adapted for the configuration management repositories of any U.S. engine company.

  6. Holistic processing of face configurations and components.

    Science.gov (United States)

    Hayward, William G; Crookes, Kate; Chu, Ming Hon; Favelle, Simone K; Rhodes, Gillian

    2016-10-01

    Although many researchers agree that faces are processed holistically, we know relatively little about what information holistic processing captures from a face. Most studies that assess the nature of holistic processing do so with changes to the face affecting many different aspects of face information (e.g., different identities). Does holistic processing affect every aspect of a face? We used the composite task, a common means of examining the strength of holistic processing, with participants making same-different judgments about configuration changes or component changes to 1 portion of a face. Configuration changes involved changes in spatial position of the eyes, whereas component changes involved lightening or darkening the eyebrows. Composites were either aligned or misaligned, and were presented either upright or inverted. Both configuration judgments and component judgments showed evidence of holistic processing, and in both cases it was strongest for upright face composites. These results suggest that holistic processing captures a broad range of information about the face, including both configuration-based and component-based information. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  7. Sandia software guidelines, Volume 4: Configuration management

    Energy Technology Data Exchange (ETDEWEB)

    1992-06-01

    This volume is one in a series of Sandia Software Guidelines for use in producing quality software within Sandia National Laboratories. This volume is based on the IEEE standard and guide for software configuration management. The basic concepts and detailed guidance on implementation of these concepts are discussed for several software project types. Example planning documents for both projects and organizations are included.

  8. Sibling Gender Configuration and Family Processes

    NARCIS (Netherlands)

    van der Pol, Lotte D.; Mesman, Judi; Groeneveld, Marleen G.; Endendijk, Joyce J.; van Berkel, Sheila R.; Hallers-Haalboom, Elizabeth T.; Bakermans-Kranenburg, Marian J.

    2016-01-01

    The current study focuses on the effects of sibling gender configuration on family processes during early childhood. In a sample of 369 two-parent families with two children (youngest 12 months, oldest about 2 years older), both siblings’ noncompliant and oppositional behaviors and fathers’ and

  9. TWRS configuration management requirement source document

    International Nuclear Information System (INIS)

    Vann, J.M.

    1997-01-01

    The TWRS Configuration Management (CM) Requirement Source document prescribes CM as a basic product life-cycle function by which work and activities are conducted or accomplished. This document serves as the requirements basis for the TWRS CM program. The objective of the TWRS CM program is to establish consistency among requirements, physical/functional configuration, information, and documentation for TWRS and TWRS products, and to maintain this consistency throughout the life-cycle of TWRS and the product, particularly as changes are being made

  10. Integrating configuration workflows with project management system

    International Nuclear Information System (INIS)

    Nilsen, Dimitri; Weber, Pavel

    2014-01-01

    The complexity of the heterogeneous computing resources, services and recurring infrastructure changes at the GridKa WLCG Tier-1 computing center require a structured approach to configuration management and optimization of interplay between functional components of the whole system. A set of tools deployed at GridKa, including Puppet, Redmine, Foreman, SVN and Icinga, provides the administrative environment giving the possibility to define and develop configuration workflows, reduce the administrative effort and improve sustainable operation of the whole computing center. In this presentation we discuss the developed configuration scenarios implemented at GridKa, which we use for host installation, service deployment, change management procedures, service retirement etc. The integration of Puppet with a project management tool like Redmine provides us with the opportunity to track problem issues, organize tasks and automate these workflows. The interaction between Puppet and Redmine results in automatic updates of the issues related to the executed workflow performed by different system components. The extensive configuration workflows require collaboration and interaction between different departments like network, security, production etc. at GridKa. Redmine plugins developed at GridKa and integrated in its administrative environment provide an effective way of collaboration within the GridKa team. We present the structural overview of the software components, their connections, communication protocols and show a few working examples of the workflows and their automation.

  11. Integrated Management System, Configuration and Document Control for Research Reactors

    International Nuclear Information System (INIS)

    Steynberg, B.J.; Bruyn, J.F. du

    2017-01-01

    An integrated management system is a single management framework establishing all the processes necessary for the organisation to address all its goals and objectives. Very often only quality, environment and health & safety goals are included when referred to an integrated management system. However, within the research reactor environment such system should include goals pertinent to economic, environmental, health, operational, quality, safeguards, safety, security, and social considerations. One of the important objectives of an integrated management is to create the environment for a healthy safety culture. Configuration management is a disciplined process that involves both management and technical direction to establish and document the design requirements and the physical configuration of the research reactor and to ensure that they remain consistent with each other and the documentation. Configuration is the combination of the physical, functional, and operational characteristics of the structures, systems, and components (SSCs) or parts of the research reactor, operation, or activity. The basic objectives and general principles of configuration management are the same for all research reactors. The objectives of configuration management are to: a) Establish consistency among design requirements, physical configuration, and documentation (including analyses, drawings, and procedures) for the research reactor; b) Maintain this consistency throughout the life of the research reactor, particularly as changes are being made; and c) Retain confidence in the safety of the research reactor. The key elements needed to manage the configuration of research reactors are design requirements, work control, change control, document control, and configuration management assessments. The objective of document control is to ensure that only the most recently approved versions of documents are used in the process of operating, maintaining, and modifying the research reactor

  12. Automated Transportation Management System (ATMS) Configuration Management Plan. Revision 1

    International Nuclear Information System (INIS)

    Weidert, R.S.

    1994-01-01

    This document describes the Software Configuration Management (SCM) approach and procedures to be utilized in developing and maintaining the Automated Transportation Management System (ATMS). The configuration management procedures are necessary to ensure that any changes made to software and related documentation are consistent with ATMS goals and contained securely in a central library. This plan applies to all software and associated documentation used in producing ATMS V1.0 and ATMS V2.0 system

  13. Configuration management with chef-solo

    CERN Document Server

    Rahman, Naveed ur

    2014-01-01

    This is a step-by-step guide, full of hands-on examples of real-world deployment tasks. Each topic is explained and placed in context, while also pointing out the key details of the concepts used. This book is aimed at system administrators and system engineers who have an understanding of configuration management tools and infrastructure. For novice administrators, it contains easy-to-use application recipes to get started immediately.

  14. Enhancing operability and reliability through configuration management

    International Nuclear Information System (INIS)

    Hancock, L.R.

    1993-01-01

    This paper describes the evolution of plant design control techniques from the early 1970's to today's operating environment that demands accurate, up-to-date design data. This evolution of design control is responsible for the increasingly troublesome scenario of design data being very difficult to locate and when found, its credibility is questioned. The design information could be suspect because there are discrepancies between two or more source documents or there is a difference between the design documents and the physical configuration of the plant. This paper discusses the impact these design control problems are having on plant operations and presents common sense solutions for improving configuration management techniques to ultimately enhance operability and reliability

  15. Training to Support Standardization and Improvement of Configuration Management Activities

    Energy Technology Data Exchange (ETDEWEB)

    Dauber, V.; Scheffer, N.; Schoenfelder, C.

    2015-07-01

    In recent years AREVA has conducted several measures to enhance the effectiveness and efficiency of configuration management-related activities within a nuclear power plant (NPP) new build as well as modernization projects, thereby further strengthening its commitment to achieving the highest level of safety in nuclear facilities. This paper describes a new training course that shall support the standardization and improvement of configuration management activities. Recommendations will be given that should be considered when designing and developing comparable training programs to support change processes within engineering units. (Author)

  16. Space Geodesy Project Information and Configuration Management Procedure

    Science.gov (United States)

    Merkowitz, Stephen M.

    2016-01-01

    This plan defines the Space Geodesy Project (SGP) policies, procedures, and requirements for Information and Configuration Management (CM). This procedure describes a process that is intended to ensure that all proposed and approved technical and programmatic baselines and changes to the SGP hardware, software, support systems, and equipment are documented.

  17. Adapting Configuration Management for Agile Teams Balancing Sustainability and Speed

    CERN Document Server

    Moreira, Mario E

    2009-01-01

    Adapting Configuration Management for Agile Teams provides very tangible approaches on how Configuration Management with its practices and infrastructure can be adapted and managed in order to directly benefit agile teams. Written by Mario E. Moreira, author of Software Configuration Management Implementation Roadmap , columnist for CM Crossroads online community and writer for the Agile Journal, this unique book provides concrete guidance on tailoring CM for Agile projects without sacrificing the principles of Configuration Management.

  18. Some Aspects of Process Computers Configuration Control in Nuclear Power Plant Krsko - Process Computer Signal Configuration Database (PCSCDB)

    International Nuclear Information System (INIS)

    Mandic, D.; Kocnar, R.; Sucic, B.

    2002-01-01

    During the operation of NEK and other nuclear power plants it has been recognized that certain issues related to the usage of digital equipment and associated software in NPP technological process protection, control and monitoring, is not adequately addressed in the existing programs and procedures. The term and the process of Process Computers Configuration Control joins three 10CFR50 Appendix B quality requirements of Process Computers application in NPP: Design Control, Document Control and Identification and Control of Materials, Parts and Components. This paper describes Process Computer Signal Configuration Database (PCSCDB), that was developed and implemented in order to resolve some aspects of Process Computer Configuration Control related to the signals or database points that exist in the life cycle of different Process Computer Systems (PCS) in Nuclear Power Plant Krsko. PCSCDB is controlled, master database, related to the definition and description of the configurable database points associated with all Process Computer Systems in NEK. PCSCDB holds attributes related to the configuration of addressable and configurable real time database points and attributes related to the signal life cycle references and history data such as: Input/Output signals, Manually Input database points, Program constants, Setpoints, Calculated (by application program or SCADA calculation tools) database points, Control Flags (example: enable / disable certain program feature) Signal acquisition design references to the DCM (Document Control Module Application software for document control within Management Information System - MIS) and MECL (Master Equipment and Component List MIS Application software for identification and configuration control of plant equipment and components) Usage of particular database point in particular application software packages, and in the man-machine interface features (display mimics, printout reports, ...) Signals history (EEAR Engineering

  19. Prototype equipment status monitor for plant operational configuration management

    International Nuclear Information System (INIS)

    DeVerno, M.; Trask, D.; Groom, S.

    1998-01-01

    CANDU plants, such as the Point Lepreau GS, have tens of thousands of operable devices. The status of each operable device must be immediately available to plan and execute future changes to the plant. Historically, changes to the plant's operational configuration have been controlled using manual and administrative methods where the status of each operable device is maintained on operational flowsheets located in the work control area of the main control room. The operational flowsheets are used to plan and develop Operating Orders (OOs) or Order-to-Operate (OTOs) and the control centre work processes are used to manage their execution. After performing each OO procedure, the operational flowsheets are updated to reflect the new plant configuration. This process can be very time consuming, and due to the manual processes, can lead to the potential for time lags and errors in the recording of the current plant configuration. Through a cooperative research and development program, Canadian CANDU utilities and Atomic Energy of Canada Limited, the design organization, have applied modern information technologies to develop a prototype Equipment Status Monitor (ESM) to address processes and information flow for efficient operational configuration management. The ESM integrates electronic operational flowsheets, equipment databases, engineering and work management systems, and computerized procedures to assess, plan, execute, track, and record changes to the plant's operational configuration. This directly leads to improved change control, more timely and accurate plant status information, fewer errors, and better decision making regarding future changes. These improvements to managing the plant's operational configuration are essential to increasing plant safety, achieving a high plant availability, and maintaining high capability and capacity factors. (author)

  20. Development of configuration risk management tool

    International Nuclear Information System (INIS)

    Masuda, Takahiro; Doi, Eiji

    2003-01-01

    Tokyo Electric Power Company (referred to as TEPCO hereinafter), and other Japanese utilities as well, have been trying to improve the capacity factor of their Nuclear Power Plants (NPPs) through modernization of Operation and Maintenance strategy. TEPCO intends to apply risk information to O and M field with maintaining or even improving both safety and production efficiency. Under these situations, TEPCO with some BWR utilities started to develop a Configuration Risk Management (CRM) tool that can estimate risk in various plant conditions due to configuration changes during outage. Moreover, we also intend to apply CRM to on-line maintenance (OLM) in the near future. This tool can calculate the Core Damage Frequency (CDF) according to given plant condition, such as SSCs availability, decay heat level and the inventory of coolant in both outage state and full-power operation. From deterministic viewpoint, whether certain configuration meet the related requirements of Technical Specifications. User-friendly interface is one of the important features of this tool because this enables the site engineers with little experience in PSA to quantify and utilize the risk information by this tool. (author)

  1. Configuration management plan for the GENII software

    International Nuclear Information System (INIS)

    Rittmann, P.D.

    1994-01-01

    The GENII program calculates doses from radionuclides released into the environment for a variety of possible exposure scenarios. The user prepares an input data file with the necessary modelling assumptions and parameters. The program reads the user's input file, computes the necessary doses and stores these results in an output file. The output file also contains a listing of the user's input and gives the title lines from the data libraries which are accessed in the course of the calculations. The purpose of this document is to provide users of the GENII software with the configuration controls which are planned for use by WHC in accordance with WHC-CM-3-10. The controls are solely for WHC employees. Non-WHC individuals are not excluded, but no promise is made or implied that they will be informed of errors or revisions to the software. The configuration controls cover the GENII software, the GENII user's guide, the list of GENII users at WHC, and the backup copies. Revisions to the software must be approved prior to distribution in accordance with this configuration management plan

  2. Guide for Operational Configuration Management Program including the adjunct programs of design reconstitution and material condition and aging management

    International Nuclear Information System (INIS)

    1993-11-01

    This standard presents program criteria and implementation guidance for an operational configuration management program for DOE nuclear and non-nuclear facilities in the operational phase. Portions of this standard are also useful for other DOE processes, activities, and programs. This Part 1 contains foreword, glossary, acronyms, bibliography, and Chapter 1 on operational configuration management program principles. Appendices are included on configuration management program interfaces, and background material and concepts for operational configuration management

  3. [Formian 2 and a Formian Function for Processing Polyhedric Configurations

    Science.gov (United States)

    Nooshin, H.; Disney, P. L.; Champion, O. C.

    1996-01-01

    The work began in October 1994 with the following objectives: (1) to produce an improved version of the programming language Formian; and (2) to create a means for computer aided handling of polyhedric configurations including the geodesic forms of all kinds. A new version of Formian, referred to as Formian 2, is being implemented to operate in the Windows 95 environment. It is an ideal tool for configuration management in a convenient and user-friendly manner. The second objective was achieved by creating a standard Formian function that allows convenient handling of all types of polyhedric configurations. In particular, the focus of attention is on polyhedric configurations that are of importance in architectural and structural engineering fields. The natural medium for processing of polyhedric configurations is a programming language that incorporates the concepts of 'formex algebra'. Formian is such a programming language in which the processing of polyhedric configurations can be carried out using the standard elements of the language. A description of this function is included in a chapter for a book entitled 'Beyond the Cube: the Architecture of space Frames and Polyhedra'. A copy of this chapter is appended.

  4. Configuration management after design basis reconstitution

    International Nuclear Information System (INIS)

    Purcell, J.J.; Livingston, B.R.

    1991-01-01

    Over the last few years, Fort Calhoun station (FCS) has implemented a number of programs to enhance plant operability and readiness. The design basis document (DBD) reconstitution project was the cornerstone of this effort. Vendor manual upgrade, operating procedures upgrade, plant equipment data-base verification, equipment labeling, and warehousing improvements were also implemented as part of this improvement program. With the completion of these programs, plant documentation was current to the baselines established by each program, and a configuration management program (CMP) was established to maintain this level of accuracy throughout the remaining life of FCS. Change control throughout the organization has been reviewed and upgraded to ensure that all changes are evaluated for impact to the design bases

  5. Role of configuration management in improving quality of metal products

    International Nuclear Information System (INIS)

    Ali, U.; Kalsoom, T.

    2007-01-01

    The Configuration Management (CM) is an imperative discipline which helps in producing quality metal products for the customers. CM implements a graded approach to Configuration Items whose failure poses human as well as product losses. Effective CM provides information to Project Management, Quality Control, and Quality Assurance in identifying schedules and processes related to metal component production. The CM is a supportive function, mostly working side by side with Quality Assurance and Quality Control in the development / production of metal parts. The CM provides tools and guidelines for managing a product while Quality Assurance verifies and validates the same outside the scope of Configuration Audits. Configuration Management raises productivity of metal product, makes-available design reuse, reduces service and support costs, enhances visibility and eliminates rework on metal products. The elements of CM i.e. Identification, Control, Status Accounting and Audits playa vital role to enhance the quality of metal products. Only established CM System can make it possible to swing initial development criteria to final user friendly metal products. The challenges of today in our metal industry are to design and develop state-of-the-art products, for which, CM ideas given in this paper, will help to achieve all the set goals. (author)

  6. Software configuration management plan for the Hanford site technical database

    International Nuclear Information System (INIS)

    GRAVES, N.J.

    1999-01-01

    The Hanford Site Technical Database (HSTD) is used as the repository/source for the technical requirements baseline and programmatic data input via the Hanford Site and major Hanford Project Systems Engineering (SE) activities. The Hanford Site SE effort has created an integrated technical baseline for the Hanford Site that supports SE processes at the Site and project levels which is captured in the HSTD. The HSTD has been implemented in Ascent Logic Corporation (ALC) Commercial Off-The-Shelf (COTS) package referred to as the Requirements Driven Design (RDD) software. This Software Configuration Management Plan (SCMP) provides a process and means to control and manage software upgrades to the HSTD system

  7. Good Practices for Software Configuration Management with MDA Metodology

    OpenAIRE

    Manuel Morejón Espinosa

    2012-01-01

    Software Configuration Management (SCM) forms part of the software development process. Its principal goal is to coordinate this development and minimize all possible errors. In order to meet its goal various activities are carried out, of which can be identified: items identification, change control, version control, audit and status reporting. Inside enterprise applications the software development can be guided from system model as methodology. The name of this methodology is Model Driven ...

  8. SAP ERP financial accounting and controlling configuration and use management

    CERN Document Server

    Okungbowa, Andrew

    2015-01-01

    SAP ERP modules are notoriously hard to configure and use effectively without a lot of practice and experience. But as SAP ERP Financial Accounting and Controlling: Configuration and Use Management shows, it doesn't have to be so difficult. The book takes a systematic approach that leads SAP Financial Accounting and Controlling (FICO) users step by step through configuring and using all the program's facets. This approach makes configuration complexities manageable. The book's author-SAP expert, trainer, and accountant Andrew Okun

  9. Information Technology for Nuclear Power Plant Configuration Management

    International Nuclear Information System (INIS)

    2010-07-01

    Configuration management (CM) is an essential component of nuclear power plant design, construction and operation. The application of information technology (IT) offers a method to automate and ensure the timely and effective capture, processing and distribution of key nuclear power plant information to support CM principles and practical processes and procedures for implementation of CM at nuclear power plants. This publication reviews some of the principles established in IAEA-TECDOC-1335, 'Configuration Management in Nuclear Power Plants.' It also recaps tenets laid out in IAEA- TECDOC-1284, 'Information Technology Impact on Nuclear Power Plant Documentation' that supports CM programmes. This publication has been developed in conjunction with and designed to support these other two publications. These three publications combined provide a comprehensive discussion on configuration management, information technology and the relationship between them. An extensive discussion is also provided in this publication on the role of the design basis of the facility and its control through the CM process throughout the facility's lifetime. While this report was developed specifically for nuclear power plants, the principles discussed can be usefully applied to any high hazard nuclear facility

  10. Tank waste remediation system configuration management implementation plan

    International Nuclear Information System (INIS)

    Vann, J.M.

    1998-01-01

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from the life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program

  11. Innovative Graded Approach to D and D Configuration Management

    International Nuclear Information System (INIS)

    Kronvall, C.M.; Muller, F.J.; Spencer, R.S.

    2009-01-01

    CH2M Hill Plateau Remediation Contract personnel have developed and implemented an innovative, graded approach to Configuration Management for use in the Decontamination and Decommissioning (D and D) of Nuclear Facilities. The Work Package Configuration Management (WPCM) (1) process is a change management process that inserts engineering rigor into a work package to ensure safe modification to a Structure, System, or Component (SSC). Sketches, historical drawings, or other tools may be used within the process. Traditional configuration management requires that design documentation be prepared, reviewed, approved, and placed into a stand alone data management system. Following of approval for construction/modification, the design package is placed into a work package. The work package adds installation instructions and proceeds through a separate review and approval prior to being placed into a second data management system. The practice allows for the separate tracking and retrieval of design and maintenance/construction information. During D and D of a facility where the equipment is being 100% removed and/or the facility is being reduced to 'slab-on-grade', there is minimal value in maintaining a stand alone design history that simply shows a blank drawing where a SSC, or facility used to be. As a way of streamlining the D and D process, the design media is included as a part of the work package that authorizes the work process. Instead of two separate reviews and documentation of information in two separate databases, the design media is reviewed/approved once as a part of the work package process. As an additional means of streamlining the D and D process, the design may include Computer Aided Design (CAD) 3-Dimensional (3-D) multiple diagrams that show the progressive states of equipment removal/facility demolition rather than a single simple 'before and after' diagram. The added graphics flexibility allows field staff to track progress and can be used as a

  12. Configural and component processing in simultaneous and sequential lineup procedures

    OpenAIRE

    Flowe, HD; Smith, HMJ; Karoğlu, N; Onwuegbusi, TO; Rai, L

    2015-01-01

    Configural processing supports accurate face recognition, yet it has never been examined within the context of criminal identification lineups. We tested, using the inversion paradigm, the role of configural processing in lineups. Recent research has found that face discrimination accuracy in lineups is better in a simultaneous compared to a sequential lineup procedure. Therefore, we compared configural processing in simultaneous and sequential lineups to examine whether there are differences...

  13. Comparison of DOE and NIRMA approaches to configuration management programs

    International Nuclear Information System (INIS)

    Yang, E.Y.; Kulzick, K.C.

    1995-01-01

    One of the major management programs used for commercial, laboratory, and defense nuclear facilities is configuration management. The safe and efficient operation of a nuclear facility requires constant vigilance in maintaining the facility's design basis with its as-built condition. Numerous events have occurred that can be attributed to (either directly or indirectly) the extent to which configuration management principles have been applied. The nuclear industry, as a whole, has been addressing this management philosophy with efforts taken on by its constituent professional organizations. The purpose of this paper is to compare and contrast the implementation plans for enhancing a configuration management program as outlined in the U.S. Department of Energy's (DOE's) DOE-STD-1073-93, open-quotes Guide for Operational Configuration Management Program,close quotes with the following guidelines developed by the Nuclear Information and Records Management Association (NIRMA): 1. PP02-1994, open-quotes Position Paper on Configuration Managementclose quotes 2. PP03-1992, open-quotes Position Paper for Implementing a Configuration Management Enhancement Program for a Nuclear Facilityclose quotes 3. PP04-1994 open-quotes Position Paper for Configuration Management Information Systems.close quotes

  14. Study of evaluation techniques of software configuration management and reliability

    Energy Technology Data Exchange (ETDEWEB)

    Youn, Cheong; Baek, Y. W.; Kim, H. C.; Han, H. C.; Choi, C. R. [Chungnam National Univ., Taejon (Korea, Republic of)

    2001-03-15

    The Study of activities to solve software safety and quality must be executed in base of establishing software development process for digitalized nuclear plant. Especially study of software testing and Verification and Validation must executed. For this purpose methodologies and tools which can improve software qualities are evaluated and software Testing, V and V and Configuration Management which can be applied to software life cycle are investigated. This study establish a guideline that can be used to assure software safety and reliability requirements in digitalized nuclear plant systems.

  15. Grading standards, prepared by the Configuration Management Office

    International Nuclear Information System (INIS)

    Cort, G.; Donahue, S.; Frank, J.; Perkins, B.; Wrye, J.

    1994-01-01

    This report describes the grading methodology used by the organization to determine the required levels of configuration management for all controlled elements that are part of the nuclear facility and its operation. The goal is to have a flexible grading system that accurately reflects the overall operational environment. The grading methodology should identify which items, processes, and information should be incorporated into facility baselines as controlled elements; and specify the level of formality that should be applied to activities that employ or impact these controlled elements. Evaluation categories include the following: radiological damage to workers; toxicological damage to workers; industrial safety; environmental damage; property damage; facility availability; cost effect; reputation; and commitments

  16. Experiences with Architectural Software Configuration Management in Ragnarok

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak

    1998-01-01

    This paper describes a model, denoted architectural software configuration management, that minimises the gap between software design and configuration management by allowing developers to do configuration- and version control of the abstractions and hierarchy in a software architecture. The model...... emphasises traceability and reproducibility by unifying the concepts version and bound configuration. Experiences with such a model, implemented in a prototype “Ragnarok”, from three real-life, small- to medium-sized, software development projects are reported. The conclusion is that the presented model...

  17. System Configuration Management Implementation Procedure for the Cold Vacuum Drying Facility Monitoring and Control System

    International Nuclear Information System (INIS)

    ANGLESEY, M.O.

    2000-01-01

    The purpose of this document is to establish the System Configuration Management Implementation Procedure (SCMIP) for the Cold Vacuum Drying Facility (CVDF) Monitoring and Control System (MCS). This procedure provides configuration management for the process control system. The process control system consists of equipment hardware and software that controls and monitors the instrumentation and equipment associated with the CVDF processes. Refer to SNF-3090, Cold Vacuum Drying Facility Monitoring and Control System Design Description, HNF-3553, Annex B, Safety Analysis Report for the Cold Vacuum Drying Facility, and AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration. This SCMIP identifies and defines the system configuration items in the control system, provides configuration control throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of these items

  18. Optimizing the order processing of customized products using product configuration

    DEFF Research Database (Denmark)

    Hvam, Lars; Bonev, Martin; Denkena, B.

    2011-01-01

    . Product configuration based on integrated modular product structure and product family architecture has been recognized as an effective means for implementing mass customization. In order to evaluate the effects of product configuration on order processing, a study has been conducted by the Department...... and its benefits for the order processing have been evaluated....

  19. An Evaluation Method of Equipment Reliability Configuration Management

    Science.gov (United States)

    Wang, Wei; Feng, Weijia; Zhang, Wei; Li, Yuan

    2018-01-01

    At present, many equipment development companies have been aware of the great significance of reliability of the equipment development. But, due to the lack of effective management evaluation method, it is very difficult for the equipment development company to manage its own reliability work. Evaluation method of equipment reliability configuration management is to determine the reliability management capabilities of equipment development company. Reliability is not only designed, but also managed to achieve. This paper evaluates the reliability management capabilities by reliability configuration capability maturity model(RCM-CMM) evaluation method.

  20. Configural and component processing in simultaneous and sequential lineup procedures.

    Science.gov (United States)

    Flowe, Heather D; Smith, Harriet M J; Karoğlu, Nilda; Onwuegbusi, Tochukwu O; Rai, Lovedeep

    2016-01-01

    Configural processing supports accurate face recognition, yet it has never been examined within the context of criminal identification lineups. We tested, using the inversion paradigm, the role of configural processing in lineups. Recent research has found that face discrimination accuracy in lineups is better in a simultaneous compared to a sequential lineup procedure. Therefore, we compared configural processing in simultaneous and sequential lineups to examine whether there are differences. We had participants view a crime video, and then they attempted to identify the perpetrator from a simultaneous or sequential lineup. The test faces were presented either upright or inverted, as previous research has shown that inverting test faces disrupts configural processing. The size of the inversion effect for faces was the same across lineup procedures, indicating that configural processing underlies face recognition in both procedures. Discrimination accuracy was comparable across lineup procedures in both the upright and inversion condition. Theoretical implications of the results are discussed.

  1. How to scope configuration projects and manage the knowledge they require

    DEFF Research Database (Denmark)

    Shafiee, Sara; Kristjansdottir, Katrin; Hvam, Lars

    2018-01-01

    Purpose This paper aims to explore the use of the knowledge management (KM) perspective for configuration projects. Configuration projects implement configurators as information technology systems that help companies manage the specification process of customised products. An effective method...... of retrieving and formalising knowledge for configurators is essential, because it can reduce the risk of unsuccessful implementation and the time and effort required for development. Unfortunately, no standard KM frameworks are available specifically for configuration projects. This study identifies...... the knowledge necessary for different phases of a configuration project (which knowledge, for what purpose and from what sources), examines how it is transformed during a configuration project (what KM activities and tools are used) and establishes how the knowledge can be documented for future maintenance...

  2. Software Configuration Management Plan for the Sodium Removal System

    International Nuclear Information System (INIS)

    HILL, L.F.

    2000-01-01

    This document establishers the Software Configuration Management Plan (SCMP) for the software associated with the control system of the Sodium Removal System (SRS) located in the Interim Examination and Maintenance (IEM Cell) Facility of the FFTF Flux Test

  3. Database Foundation For The Configuration Management Of The CERN Accelerator Controls Systems

    CERN Document Server

    Zaharieva, Z; Peryt, M

    2011-01-01

    The Controls Configuration Database (CCDB) and its interfaces have been developed over the last 25 years in order to become nowadays the basis for the Configuration Management of the Controls System for all accelerators at CERN. The CCDB contains data for all configuration items and their relationships, required for the correct functioning of the Controls System. The configuration items are quite heterogeneous, depicting different areas of the Controls System – ranging from 3000 Front-End Computers, 75 000 software devices allowing remote control of the accelerators, to valid states of the Accelerators Timing System. The article will describe the different areas of the CCDB, their interdependencies and the challenges to establish the data model for such a diverse configuration management database, serving a multitude of clients. The CCDB tracks the life of the configuration items by allowing their clear identification, triggering of change management processes as well as providing status accounting and aud...

  4. Design basis reconstitution and configuration management of nuclear power plants

    International Nuclear Information System (INIS)

    Smith, P.R.; Cook, R.A.

    1990-01-01

    This paper presents a method by which all plants (those under construction, as well as those in operation) can benefit from a formal, step-by-step approach to data capture, storage, and retrieval for use throughout the plant life cycle. To demonstrate the viability and in-practice success of a single three-dimensional Configuration Management database, the specific capabilities of one such system are discussed in detail: the Plant Configuration Management System (PLANT/CMS). (orig.)

  5. VAM3D-CG configuration management plan

    International Nuclear Information System (INIS)

    Langford, D.W.

    1994-01-01

    The VAM3D-CG computer code has been licensed for use at Hanford, from HydroGeologic, Inc., of Herndon, VA. Version 2.4b has been installed on the 3200GWW workstations, and is currently under configuration management. The purpose of this report is to describe the installation and configuration management of VAM3D-CG on the Hanford Computer System. VAM3D-CG is written in standard FORTRAN F77

  6. Configuration management of on-line maintenance

    International Nuclear Information System (INIS)

    Grantom, C.R.

    1996-01-01

    Maintenance activities are performed on station equipment to ensure continued safe and reliable performance. Equipment reliability is thereby improved, resulting in greater confidence that the component will be capable of performing its intended (safety) function. Probabilistic Safety Assessments (PSAs) consider equipment reliability and availability to calculate Core Damage Frequency (CDF) and other risk-related values. Since maintenance activities are included in PSA analyses, the effect of equipment outages on CDF can be analyzed. Results from these types of studies can be scaled to reflect different time periods and show the time-dependent impact of planned equipment outages on CDF. These time-dependent impacts on CDF are graphically presented and referred to as ''risk profiles''. Risk profiles are being successfully used at the South Texas Project (STP) to plan preventive maintenance activities and to assess the impact of unplanned maintenance activities on plant safety. At STP, planned maintenance activities are scheduled to minimize the risk impact of unavailable equipment and to prevent the Occurrence of undesirable plant configurations. The features of the risk profiles used at STP enable the evaluation of both work scope and duration of maintenance activities to be evaluated. This is possible since the risk profile illustrates both instantaneous CDF effects and cumulative impacts to CDF

  7. Impact of configuration management system of computer center on support of scientific projects throughout their lifecycle

    International Nuclear Information System (INIS)

    Bogdanov, A.V.; Yuzhanin, N.V.; Zolotarev, V.I.; Ezhakova, T.R.

    2017-01-01

    In this article the problem of scientific projects support throughout their lifecycle in the computer center is considered in every aspect of support. Configuration Management system plays a connecting role in processes related to the provision and support of services of a computer center. In view of strong integration of IT infrastructure components with the use of virtualization, control of infrastructure becomes even more critical to the support of research projects, which means higher requirements for the Configuration Management system. For every aspect of research projects support, the influence of the Configuration Management system is reviewed and development of the corresponding elements of the system is described in the present paper.

  8. Working Environment and Software Configuration Management Assimiliation using Traceability Enhancement Technique

    International Nuclear Information System (INIS)

    Iqbal, H.; Javed, A.; Majeed, M. N.

    2015-01-01

    Software Configuration Management (SCM) Systems are very useful in coordinating group effort in large and complex software systems. As a result of change in user requirement, market needs, tools, technology or new business goals emanate out, changes are continuously induced while developing the software product. For change management, Traceability technique and SCM are two prominent practices in the software development process. SCM helps in managing configuration items while traceability helps in tracing the knowledge about the configuration items. In this paper we propose a model of the SCM system with the working environment when changes are introduced in multiple artifacts and by which high quality products are developed. (author)

  9. Impact of configuration management system of computer center on support of scientific projects throughout their lifecycle

    Science.gov (United States)

    Bogdanov, A. V.; Iuzhanin, N. V.; Zolotarev, V. I.; Ezhakova, T. R.

    2017-12-01

    In this article the problem of scientific projects support throughout their lifecycle in the computer center is considered in every aspect of support. Configuration Management system plays a connecting role in processes related to the provision and support of services of a computer center. In view of strong integration of IT infrastructure components with the use of virtualization, control of infrastructure becomes even more critical to the support of research projects, which means higher requirements for the Configuration Management system. For every aspect of research projects support, the influence of the Configuration Management system is being reviewed and development of the corresponding elements of the system is being described in the present paper.

  10. System Configuration Management Implementation Procedure for the Canister Storage Building (CSB)

    International Nuclear Information System (INIS)

    GARRISON, R.C.

    2000-01-01

    This document implements the procedure for providing configuration control for the monitoring and control systems associated with the operation of the Canister Storage Building (CSB). It identifies and defines the configuration items in the monitoring and control systems, provides configuration control of these items throughout the system life cycle, provides configuration status accounting, physical protection and control, and verifies the completeness and correctness of the items. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998), HNF-PRO-309, Computer Software Quality Assurance Requirements, HNF-PRO-2778, IRM Application Software System Life Cycle Standards, and applicable sections of administrative procedure AP-CM-6-037-00, SNF Project Process Automation Software and Equipment Configuration Management

  11. Modularisation of Software Configuration Management

    DEFF Research Database (Denmark)

    Christensen, Henrik Bærbak

    2000-01-01

    management, and outline how modularisation is natural and powerful also in this context. The analysis is partly based on experiences from case studies where small- to medium-sized development projects are using a prototype tool that supports modular software configuration management....

  12. How Configuration Management Helps Projects Innovate and Communicate

    Science.gov (United States)

    Cioletti, Louis A.; Guidry, Carla F.

    2009-01-01

    This slide presentation reviews the concept of Configuration Management (CM) and compares it to the standard view of Project management (PM). It presents two PM models: (1) Kepner-Tregoe,, and the Deming models, describes why projects fail, and presents methods of how CM helps projects innovate and communicate.

  13. Tank monitor and control system (TMACS) software configuration management plan

    International Nuclear Information System (INIS)

    GLASSCOCK, J.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments

  14. Design basis reconstitution and configuration management of nuclear power plants

    International Nuclear Information System (INIS)

    Smith, P.R.

    1989-01-01

    The major design requirements of nuclear power plant components, systems, and structures are found in the plant's licensing commitments documented in the Final Safety Analysis Report and in the technical specification commitments of the plant. These specifications consider the original design and its degradation by in-service use. Before a nuclear power plant begins operation, the plant systems, structures, and organizational elements are functionally arranged to operate in a particular way. This functional arrangement is specified by the plant's design requirements and is called its configuration. The paper discusses configuration management and information management for configuration management. The management of large amounts of information and the various information systems associated with nuclear generating facilities is an ever-growing challenge for utilities. Plant operations involve a complex interrelation among data elements, especially in relation to design modifications and operational changes. Consequently, the operation of these data systems is interrelated and, as a result, redundant data items may exist. Thus, in view of the need to control and manage the plant configuration baseline, managers are striving to streamline their information management programs, which usually involves the integration of data-base systems

  15. Which Parts of a Clinical Process EPR Needs Special Configuration

    DEFF Research Database (Denmark)

    Barlach, Anders; Simonsen, Jesper

    2007-01-01

    Subject: Which parts of an electronic patient record (EPR) can initially form a stable standard solution to be used by all clinicians? And which parts of an EPR can we predict needs initial as well as on-going re-configuration to meet the needs from diverse medical specialties. Purpose: To analyze...... which screen types in a clinical process that can be standard configured and which are subject to initial as well as on-going re-configuration. Methods and results: A pilot-project implementing a fully functional clinical process EPR was configured and used at a neurological ward, replacing all paper...... records 24/7. The analysis characterizes the different types of screens, a total of 243 included in the EPR solution. All screens have been extracted from the application and analyzed for changes – in total 222 changes. Discussion and conclusion: Most screens (87%) are very stable. Few (13%) are subjected...

  16. Configuration management; Solution for mid-life crisis

    International Nuclear Information System (INIS)

    Hancock, L.R.

    1993-01-01

    With the age of most commercial nuclear power plants hovering around twenty years, there is a mid-life crisis facing their engineering management. The crisis is that the design of the plant represented on the engineering documents (electronic or hard copy) and the actual plant configuration increasingly do not match each other. This paper will present: (1) an historical perspective on the evolution of nuclear plant design control technology, (2) impacts that plant operations have on the design, (3) a discussion of the consequences of weak design control, and (4) will offer a methodology to define and improve the configuration management program

  17. Light Duty Utility Arm computer software configuration management plan

    International Nuclear Information System (INIS)

    Philipp, B.L.

    1998-01-01

    This plan describes the configuration management for the Light Duty Utility Arm robotic manipulation arm control software. It identifies the requirement, associated documents, and the software control methodology. The Light Duty Utility Ann (LDUA) System is a multi-axis robotic manipulator arm and deployment vehicle, used to perform surveillance and characterization operations in support of remediation of defense nuclear wastes currently stored in the Hanford Underground Storage Tanks (USTs) through the available 30.5 cm (12 in.) risers. This plan describes the configuration management of the LDUA software

  18. Database foundation for the configuration management of the CERN accelerator controls systems

    International Nuclear Information System (INIS)

    Zaharieva, Z.; Martin Marquez, M.; Peryt, M.

    2012-01-01

    The Controls Configuration Database (CCDB) and its interfaces have been developed over the last 25 years in order to become nowadays the basis for the Configuration Management of the Control System for all accelerators at CERN. The CCDB contains data for all configuration items and their relationships, required for the correct functioning of the Control System. The configuration items are quite heterogeneous, depicting different areas of the Control System - ranging from 3000 Front-End Computers, 75000 software devices allowing remote control of the accelerators, to valid states of the Accelerators Timing System. The article will describe the different areas of the CCDB, their inter-dependencies and the challenges to establish the data model for such a diverse configuration management database, serving a multitude of clients. The CCDB tracks the life of the configuration items by allowing their clear identification, triggering of change management processes as well as providing status accounting and audits. This required the development and implementation of a combination of tailored processes and tools. The Controls System is a data-driven one - the data stored in the CCDB is extracted and propagated to the controls hardware in order to configure it remotely. Therefore a special attention is placed on data security and data integrity as an incorrectly configured item can have a direct impact on the operation of the accelerators. (authors)

  19. Correctness-preserving configuration of business process models

    NARCIS (Netherlands)

    Aalst, van der W.M.P.; Dumas, M.; Gottschalk, F.; Hofstede, ter A.H.M.; La Rosa, M.; Mendling, J.; Fiadeiro, J.; Inverardi, P.

    2008-01-01

    Reference process models capture recurrent business operations in a given domain such as procurement or logistics. These models are intended to be configured to fit the requirements of specific organizations or projects, leading to individualized process models that are subsequently used for domain

  20. The Development of Spatial Configuration Processing of Visual Word Forms

    Directory of Open Access Journals (Sweden)

    Chienhui Kao

    2011-05-01

    Full Text Available The analysis of spatial relationship, or configuration, among the components of a character is important for visual word form recognition (Kao et al., 2010. We investigated such spatial configuration processing in dyslexics and developing populations. Four types of characters: real- and non-characters and their upside-down versions were used in this study. The task of the observers was to determine whether two characters presented on the display were identical. One group of dyslexic children (Dys and two groups of non-dyslexic controls, one (RL matched Dys in reading performance and the other (CA matched in age, were recruited in this study. Dys performed significantly worse than the control groups for all character types, suggesting a worse visual word form processing in dyslexics. For Dys and CA, the proportional correct response for the upright real characters was better than that for their upside-down versions. RL, (which was younger showed the same effect for the non-characters. Since the non-characters disrupts the global configuration while the inverted characters disrupted both local and global configurations, our results suggest that younger children recognize a word with an analysis of the local configuration while older children, regardless of whether they are dyslexics or not, analyze the global configuration.

  1. Arguments Against a Configural Processing Account of Familiar Face Recognition.

    Science.gov (United States)

    Burton, A Mike; Schweinberger, Stefan R; Jenkins, Rob; Kaufmann, Jürgen M

    2015-07-01

    Face recognition is a remarkable human ability, which underlies a great deal of people's social behavior. Individuals can recognize family members, friends, and acquaintances over a very large range of conditions, and yet the processes by which they do this remain poorly understood, despite decades of research. Although a detailed understanding remains elusive, face recognition is widely thought to rely on configural processing, specifically an analysis of spatial relations between facial features (so-called second-order configurations). In this article, we challenge this traditional view, raising four problems: (1) configural theories are underspecified; (2) large configural changes leave recognition unharmed; (3) recognition is harmed by nonconfigural changes; and (4) in separate analyses of face shape and face texture, identification tends to be dominated by texture. We review evidence from a variety of sources and suggest that failure to acknowledge the impact of familiarity on facial representations may have led to an overgeneralization of the configural account. We argue instead that second-order configural information is remarkably unimportant for familiar face recognition. © The Author(s) 2015.

  2. Configuration management issues and objectives for a real-time research flight test support facility

    Science.gov (United States)

    Yergensen, Stephen; Rhea, Donald C.

    1988-01-01

    Presented are some of the critical issues and objectives pertaining to configuration management for the NASA Western Aeronautical Test Range (WATR) of Ames Research Center. The primary mission of the WATR is to provide a capability for the conduct of aeronautical research flight test through real-time processing and display, tracking, and communications systems. In providing this capability, the WATR must maintain and enforce a configuration management plan which is independent of, but complimentary to, various research flight test project configuration management systems. A primary WATR objective is the continued development of generic research flight test project support capability, wherein the reliability of WATR support provided to all project users is a constant priority. Therefore, the processing of configuration change requests for specific research flight test project requirements must be evaluated within a perspective that maintains this primary objective.

  3. Quality plan and configuration management in complex systems

    International Nuclear Information System (INIS)

    Gonzalez Junto, J.; Merchan Teyssiere

    1993-01-01

    Since the Second World War, the philosophy behind the quality systems of industries and service companies has evolved to embrace the whole life cycle of the product, system or service. In this evolution process, quality has become a strategic factor in the survival of entreprises. The first steps in trying to establish quality systems were taken for the armed forces, followed by space, aeronautical and nuclear projects, whose products were more and more complex and sophisticated. These systems were established by means of quality plans or programmes, and their basic objective was to guarantee a high safety level for the user and/or the general population. In later years, the main concern was to reach a determined quality level not only in one phase of the product life, but in the complete life cycle of the final product. Today a new goal is established and pursued: better quality of the product, service or system life cycle at a lower cost. Methods of improving the quality of systems and processes are the subject of numerous initiatives and studies, to better availability and maintainability of complex equipment or installations, with an extended useful life and greater requirements. Experience in the performance of complex projects shows that a higher quality may be obtained through designing a comprehensive quality plan which pays special attention to information management and modifications of the original design. Obtaining a high reliability level for an installation (equipment, systems, etc), increasing its availability and rationalizing its maintenance may be little less than fanciful without a deep knowledge of the installation, of its activities and its current status in day-to-day operation, which shows the importance of truthful information available to operators and corresponding exactly to their needs. In this frame of mind, a quality plan comprising a configuration management system of information and documents constitutes the basic support tool for

  4. Risk and Work Configuration Management as a Function of Integrated Safety Management

    International Nuclear Information System (INIS)

    Lana Buehrer; Michele Kelly; Fran Lemieux; Fred Williams

    2007-01-01

    National Security Technologies, LLC (NSTec), has established a work management program and corresponding electronic Facilities and Operations Management Information System (e-FOM) to implement Integrated Safety Management (ISM). The management of work scopes, the identification of hazards, and the establishment of implementing controls are reviewed and approved through electronic signatures. Through the execution of the program and the implementation of the electronic system, NSTec staff work within controls and utilize feedback and improvement process. The Integrated Work Control Manual further implements the five functions of ISM at the Activity level. By adding the Risk and Work Configuration Management program, NSTec establishes risk acceptance (business and physical) for liabilities within the performance direction and work management processes. Requirements, roles, and responsibilities are specifically identified in the program while e-FOM provides the interface and establishes the flowdown from the Safety Chain to work and facilities management processes to company work-related directives, and finally to Subject Matter Expert concurrence. The Program establishes, within the defined management structure, management levels for risk identification, risk mitigation (controls), and risk acceptance (business and physical) within the Safety Chain of Responsibility. The Program also implements Integrated Safeguards and Security Management within the NSTec Safety Chain of Responsibility. Once all information has been entered into e-FOM, approved, and captured as data, the information becomes searchable and sortable by hazard, location, organization, mitigating controls, etc

  5. An Implementation of a Network Configuration Management System ...

    African Journals Online (AJOL)

    The job of the network administrator becomes difficult as the number of hosts in a computer network increase. Network management requires the network administrator to have vital configuration information about hosts so as to provide viable solutions. In situations where the hosts span a large area or in several buildings as ...

  6. Data base management system configuration specification. [computer storage devices

    Science.gov (United States)

    Neiers, J. W.

    1979-01-01

    The functional requirements and the configuration of the data base management system are described. Techniques and technology which will enable more efficient and timely transfer of useful data from the sensor to the user, extraction of information by the user, and exchange of information among the users are demonstrated.

  7. Configuration management and change control at Cernavoda NPP Unit 1

    International Nuclear Information System (INIS)

    Gheorghiu, Virgil

    1998-01-01

    Effective configuration management requires that: 1. the design basis of station structures, systems, equipment and components be maintained at all times; 2. only accurate and approved technical, operational and maintenance information is available for performance of station activities; 3. correct operating manuals, flowsheets, operating sequences, operating task and training manuals are prepared and maintained currently. Design Engineering at Cernavoda NPP is primarily the responsibility of the Engineering Services Department supported if necessary by the Technical Unit. The key elements needed to achieve excellence in design engineering support for station operation, including design process and implementation of modification are investigated by answering the questions: 1. What is the station expectation for design change control?; 2. How is this provided?. Concerning design, the following aspects are stressed: Detailed Design Development; Design Verification; Design Change Implementation. The present design process is auditable and well documented. It consists of detailed design development, and design output documents such as applicable drawings, procurement specifications, installation and test requirement and the results of design and safety reviews. The design change implementation does not proceed until an Inspection Test Plan has been developed and approved as required. (author)

  8. Software control and system configuration management: A systems-wide approach

    Science.gov (United States)

    Petersen, K. L.; Flores, C., Jr.

    1984-01-01

    A comprehensive software control and system configuration management process for flight-crucial digital control systems of advanced aircraft has been developed and refined to insure efficient flight system development and safe flight operations. Because of the highly complex interactions among the hardware, software, and system elements of state-of-the-art digital flight control system designs, a systems-wide approach to configuration control and management has been used. Specific procedures are implemented to govern discrepancy reporting and reconciliation, software and hardware change control, systems verification and validation testing, and formal documentation requirements. An active and knowledgeable configuration control board reviews and approves all flight system configuration modifications and revalidation tests. This flexible process has proved effective during the development and flight testing of several research aircraft and remotely piloted research vehicles with digital flight control systems that ranged from relatively simple to highly complex, integrated mechanizations.

  9. Operational concepts for the Environmental Restoration and Waste Management Configuration Study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1990-12-01

    DOE has initiated a planning process in anticipation of upgrading all DOE waste management operations and facilities. The EM Configuration Study examines four areas: (1) planning considerations, (2) system configuration, (3) operational concepts, and (4) resource assessments. Each area is addressed by a different team. Objective of the Operational Concepts Team 3 study is to investigate, identify, define, and evaluate alternative ways to manage DOE waste management facilities, while taking into consideration the information gathered by the other EM Configuration teams. This report provides information and criteria for evaluating the relative effectiveness and efficiency of various organizational alternatives that can be used to operate and manage DOE waste facilities. Intent of this report is not to select one best management alternative but rather to provide recommendations, conclusions, and background information from which decisions will be made at a future date.

  10. Internal model of gravity influences configural body processing.

    Science.gov (United States)

    Barra, Julien; Senot, Patrice; Auclair, Laurent

    2017-01-01

    Human bodies are processed by a configural processing mechanism. Evidence supporting this claim is the body inversion effect, in which inversion impairs recognition of bodies more than other objects. Biomechanical configuration, as well as both visual and embodied expertise, has been demonstrated to play an important role in this effect. Nevertheless, the important factor of body inversion effect may also be linked to gravity orientation since gravity is one of the most fundamental constraints of our biology, behavior, and perception on Earth. The visual presentation of an inverted body in a typical body inversion paradigm turns the observed body upside down but also inverts the implicit direction of visual gravity in the scene. The orientation of visual gravity is then in conflict with the direction of actual gravity and may influence configural processing. To test this hypothesis, we dissociated the orientations of the body and of visual gravity by manipulating body posture. In a pretest we showed that it was possible to turn an avatar upside down (inversion relative to retinal coordinates) without inverting the orientation of visual gravity when the avatar stands on his/her hands. We compared the inversion effect in typical conditions (with gravity conflict when the avatar is upside down) to the inversion effect in conditions with no conflict between visual and physical gravity. The results of our experiment revealed that the inversion effect, as measured by both error rate and reaction time, was strongly reduced when there was no gravity conflict. Our results suggest that when an observed body is upside down (inversion relative to participants' retinal coordinates) but the orientation of visual gravity is not, configural processing of bodies might still be possible. In this paper, we discuss the implications of an internal model of gravity in the configural processing of observed bodies. Copyright © 2016 Elsevier B.V. All rights reserved.

  11. Advantages and Challenges to the Use of On-Line Feedback in CERN’s Accelerators Controls Configuration Management

    CERN Document Server

    Zaharieva, Z; Rolland Lopez De Coca, J; Romero Marin, A

    2014-01-01

    The Controls Configuration Service (CCS) provides the Configuration Management facilities for the Controls System for all CERN accelerators. It complies with Configuration Management standards, tracking the life of configuration items and their relationships by allowing identification and triggering change management processes. Data stored in the CCS is extracted and propagated to the controls hardware for remote configuration. The article will present the ability of the CCS to audit items and verify conformance to specification with the implementation of on-line feedback focusing on Front-End Computers (FEC) configurations. Long-standing problems existed in this area such as discrepancies between the actual state of the FEC and the configuration sent to it at reboot. This resulted in difficult-to-diagnose behaviour and disturbance for the Operations team. The article will discuss the solution architecture (tailored processes and tools), the development and implementation challenges, as well as the advantages...

  12. What carries a mediation process? Configural analysis of mediation.

    Science.gov (United States)

    von Eye, Alexander; Mun, Eun Young; Mair, Patrick

    2009-09-01

    Mediation is a process that links a predictor and a criterion via a mediator variable. Mediation can be full or partial. This well-established definition operates at the level of variables even if they are categorical. In this article, two new approaches to the analysis of mediation are proposed. Both of these approaches focus on the analysis of categorical variables. The first involves mediation analysis at the level of configurations instead of variables. Thus, mediation can be incorporated into the arsenal of methods of analysis for person-oriented research. Second, it is proposed that Configural Frequency Analysis (CFA) can be used for both exploration and confirmation of mediation relationships among categorical variables. The implications of using CFA are first that mediation hypotheses can be tested at the level of individual configurations instead of variables. Second, this approach leaves the door open for different types of mediation processes to exist within the same set. Using a data example, it is illustrated that aggregate-level analysis can overlook mediation processes that operate at the level of individual configurations.

  13. The driving elements of an integrated configuration management program

    International Nuclear Information System (INIS)

    Zaalouk, M.G.

    1990-01-01

    The need for an effective long term Plant Configuration Management Program (CMP) has been demonstrated in response to Plant Design Modification and Plant Life Extension activities. Having particular need are those Utilities operating early vintage nuclear plants, where numerous modifications have been made without the benefit of an accurate, complete, properly maintained and controlled Design Basis. This paper presents a model for a long term, cost effective CMP which is based on and driven by the development, maintenance and control of accurate plant Design Basis Information. The model also provides a systematic approach for devising and implementing an integrated Plant CMP based on the essential attributes of the Plant Configuration Management, including Design Basis

  14. Management functions, issues, and configuration alternatives: TO support a transportation management configuration study: [Final report

    International Nuclear Information System (INIS)

    1987-01-01

    The Office of Civilian Radioactive Waste Management (OCRWM) of the Department of Energy (DOE) is responsible for the safe transporation and disposal of spent nuclear fuel from utility-owned nuclear power generation reactors and high-level radioactive waste from both defense and civilian generators to long-term storage repositories. Given the volume, duration, and sensitivity of the operation, DOE is seeking not only the safest and best transportation system but also the most effective and resource-efficient management concept. Within the general guidelines of the Nuclear Waste Policy Act (NWPA) of 1982 calling for the fullest possible use of private industry contracts, this study examines the technical and administrative functions as well as the key issues to be addressed in the formation of a management structure. In order to stand alone as a comprehensive treatment of the total requirement, the material contained in many seperate and sometimes divergent DOE/OCRWM documents was evaluated and is compiled here. An attempt was made to succinctly define the nature of the problem, the objectives and scope of both the operating and management systems, and then to dissect the functions required in order to meet the objectives and operating functions are listed and described

  15. Mastering demand and supply uncertainty with combined product and process configuration

    NARCIS (Netherlands)

    Verdouw, C.N.; Beulens, A.J.M.; Trienekens, J.H.; Verwaart, D.

    2010-01-01

    The key challenge for mastering high uncertainty of both demand and supply is to attune products and business processes in the entire supply chain continuously to customer requirements. Product configurators have proven to be powerful tools for managing demand uncertainty. This paper assesses how

  16. Benefits Assessment for Tactical Runway Configuration Management Tool

    Science.gov (United States)

    Oseguera-Lohr, Rosa; Phojanamongkolkij, Nipa; Lohr, Gary; Fenbert, James W.

    2013-01-01

    The Tactical Runway Configuration Management (TRCM) software tool was developed to provide air traffic flow managers and supervisors with recommendations for airport configuration changes and runway usage. The objective for this study is to conduct a benefits assessment at Memphis (MEM), Dallas Fort-Worth (DFW) and New York's John F. Kennedy (JFK) airports using the TRCM tool. Results from simulations using the TRCM-generated runway configuration schedule are compared with results using historical schedules. For the 12 days of data used in this analysis, the transit time (arrival fix to spot on airport movement area for arrivals, or spot to departure fix for departures) for MEM departures is greater (7%) than for arrivals (3%); for JFK, there is a benefit for arrivals (9%) but not for departures (-2%); for DFW, arrivals show a slight benefit (1%), but this is offset by departures (-2%). Departure queue length benefits show fewer aircraft in queue for JFK (29%) and MEM (11%), but not for DFW (-13%). Fuel savings for surface operations at MEM are seen for both arrivals and departures. At JFK there are fuel savings for arrivals, but these are offset by increased fuel use for departures. In this study, no surface fuel benefits resulted for DFW. Results suggest that the TRCM algorithm requires modifications for complex surface traffic operations that can cause taxi delays. For all three airports, the average number of changes in flow direction (runway configuration) recommended by TRCM was many times greater than the historical data; TRCM would need to be adapted to a particular airport's needs, to limit the number of changes to acceptable levels. The results from this analysis indicate the TRCM tool can provide benefits at some high-capacity airports. The magnitude of these benefits depends on many airport-specific factors and would require adaptation of the TRCM tool; a detailed assessment is needed prior to determining suitability for a particular airport.

  17. Systems Engineering Plan and project record Configuration Management Plan for the Mixed Waste Disposal Initiative

    International Nuclear Information System (INIS)

    Bryan, W.E.; Oakley, L.B.

    1993-04-01

    This document summarizes the systems engineering assessment that was performed for the Mixed Waste Disposal Initiative (MWDI) Project to determine what types of documentation are required for the success of the project. The report also identifies the documents that will make up the MWDI Project Record and describes the Configuration Management Plan describes the responsibilities and process for making changes to project documentation

  18. Software Configuration Management Plan for the K West Basin Integrated Water Treatment System (IWTS) - Project A.9

    International Nuclear Information System (INIS)

    GREEN, J.W.

    2000-01-01

    This document provides a configuration control plan for the software associated with the operation and control of the Integrated Water Treatment System (IWTS). It establishes requirements for ensuring configuration item identification, configuration control, configuration status accounting, defect reporting and resolution of computer software. It is written to comply with HNF-SD-SNF-CM-001, Spent Nuclear Fuel Configuration Management Plan (Forehand 1998) and HNF-PRO-309 Computer Software Quality Assurance Requirements, and applicable sections of administrative procedure CM-6-037-00, SNF Project Process Automation Software and Equipment

  19. Mac configuration management at the Los Alamos National Laboratory

    Energy Technology Data Exchange (ETDEWEB)

    Marcus, Allan B [Los Alamos National Laboratory

    2010-01-01

    The Los Alamos National Laboratory (LANL) had a need for central configuration management of non-Windows computers. LANL has three to five thousand Macs and an equal number of Linux based systems. The primary goal was to be able to inventory all non-windows systems and patch Mc OS X systems. LANL examined a number of commercial and open source solutions and ultimately selected Puppet. This paper will discuss why we chose Puppet, how we implemented it, and some lessons we learned along the way.

  20. Configuration management of modifications to nuclear power plants

    International Nuclear Information System (INIS)

    Capano, G.A.

    1983-01-01

    This paper examines Configuration Management (CM), which is a method of monitoring and controlling a power plant's data base to ensure that the data base remains consistent and reflects the physical characteristics of the plant. Myriad changes are imposed on power plant systems by regulatory requirements, operations, and administrative needs. This paper outlines the elements a CM program requires to track and assess the impacts of those changes on the data base, and to make necessary revisions. The paper notes several instances where CM has been used successfully, describes several practical applications of CM, and discusses potential cost savings that can be realized from these applications

  1. Profiling event logs to configure risk indicators for process delays

    NARCIS (Netherlands)

    Pika, A.; Aalst, van der W.M.P.; Fidge, C.J.; Hofstede, ter A.H.M.; Wynn, M.T.; Salinesi, C.; Norrie, M.C.; Pastor, O.

    2013-01-01

    Risk identification is one of the most challenging stages in the risk management process. Conventional risk management approaches provide little guidance and companies often rely on the knowledge of experts for risk identification. In this paper we demonstrate how risk indicators can be used to

  2. Configuration management and load monitoring procedures for nuclear plant structures

    International Nuclear Information System (INIS)

    Chu, S.L.; Skaczylo, A.T.

    1990-01-01

    This paper describes a computer-aided engineering tool called the Load Monitoring System (LMS) that was proven effective for monitoring floor framing, loads, and structural integrity. The system links structural analysis, design investigation, and reporting and automated drafting programs with a Data Base Management System (DBMS). It provides design engineers with a powerful tool for quickly incorporating, tracking, and assessing load revisions and determining effects on steel floor framing members and connections, thereby helping to reduce design man-hours, minimize the impact of structural modifications, and maintain and document the design baseline. The major benefit to utilities are the reduction in engineering costs, assistance with plant configuration management, and assurance of structural safety throughout the operating life of a nuclear plant and at evaluation for license renewal. (orig./HP)

  3. Project B610 process control configuration acceptance test procedure

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1994-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; proper operation of all display data on the operator's console; proper operation of all required alarms; and proper operation of all required interlocks. The MICON A/S control system is configured to replace all the control, indication, and alarm panels now located in the Power Control Room. Nine systems are covered by this control configuration, 2736-ZB HVAC, 234-5Z HVAC, Process Vacuum, Dry Air, 291-Z Closed Loop Cooling, Building Accelerometer, Evacuation Siren, Stack CAMs, and Fire. The 2736-ZB HVAC system consists of the ventilation controls for 2736-ZB and 2736-Z as well as alarms for the emergency generators and 232-Z. The 234-5Z HVAC system is the ventilation controls for 235-5Z and 236-Z buildings. Process Vacuum covers the controls for the 26 inch vacuum system. Dry Air covers the controls for the steam and electric air dryers. The 291-Z Closed Loop Cooling system consists of the status indications and alarms for the 291-Z compressor and vacuum pump closed loop cooling system. The rest of closed loop cooling was tested earlier. The Building Accelerometer system consists of the status indications for the two seismic system accelerometers. The Evacuation Siren system includes the controls for the evacuation and take cover sirens. Stack CAMs cover the alarms for the various building ventilation stack continuous air monitors. Finally, the Fire system covers the various fire alarms now located in Room 321-A

  4. Configuration management of TFTR during final fabrication/assembly/installation

    International Nuclear Information System (INIS)

    Sabado, M.; Rappe, G.H.; Stern, E.; Wexler, H.

    1983-01-01

    In essence, configuration management consists of the establishment of a Baseline definition for each project phase, well documented, so that all project participants are conversant with it and the disciplined redefinition of the baseline as the project matures. This paper describes the methods by which the Baseline design for each phase of the TFTR program was updated. Definition was initiated through informal controls which became more formal as the design progressed. At the point where the design was essentially frozen, that is, released for procurement and manufacturing, a configuration change control procedure was instituted to continue on a routine basis both engineering and management review of all changes. Since the TFTR program is experimental in nature it was understood from the outset that desirable changes based on new analytical results and experimental results from other fusion programs could be injected into the design. The problem was one of maintaining the flexibility of providing a reasonable baseline definition, in order to allow the design to proceed yet avoiding the premature freezing of the design, in order to incorporate required changes at lowest cost

  5. Strategies to Automatically Derive a Process Model from a Configurable Process Model Based on Event Data

    Directory of Open Access Journals (Sweden)

    Mauricio Arriagada-Benítez

    2017-10-01

    Full Text Available Configurable process models are frequently used to represent business workflows and other discrete event systems among different branches of large organizations: they unify commonalities shared by all branches and describe their differences, at the same time. The configuration of such models is usually done manually, which is challenging. On the one hand, when the number of configurable nodes in the configurable process model grows, the size of the search space increases exponentially. On the other hand, the person performing the configuration may lack the holistic perspective to make the right choice for all configurable nodes at the same time, since choices influence each other. Nowadays, information systems that support the execution of business processes create event data reflecting how processes are performed. In this article, we propose three strategies (based on exhaustive search, genetic algorithms and a greedy heuristic that use event data to automatically derive a process model from a configurable process model that better represents the characteristics of the process in a specific branch. These strategies have been implemented in our proposed framework and tested in both business-like event logs as recorded in a higher educational enterprise resource planning system and a real case scenario involving a set of Dutch municipalities.

  6. Windows Calorimeter Control (WinCal) program computer software configuration management plan

    International Nuclear Information System (INIS)

    1997-01-01

    This document describes the system configuration management activities performed in support of the Windows Calorimeter Control (WinCal) system, in accordance with Site procedures based on Institute of Electrical and Electronic Engineers (IEEE) Standard 828-1990, Standard for Software Configuration Management Plans (IEEE 1990) and IEEE Standard 1042-1987, Guide to Software Configuration Management (IEEE 1987)

  7. Effective Spend Management Through Electronic Reverse Auction Configurations

    Directory of Open Access Journals (Sweden)

    Mojmír Prídavok

    2013-07-01

    Full Text Available The purpose of the paper is to analyz wide range of possible auction strategies and configurations of eRA, with respect to the ever changing market conditions. Electronic reverse auction (eRA represents an electronic sourcing method of competitive bidding among a number of qualified suppliers. Theory assumes that eRA represents pure market environment with information perfectly distributed between both buyers and suppliers. Although initial eRA cost savings in B2B could be as high as 40%, without deeper knowledge of different auctions strategies and configurations, additional cost reductions are not possible. To identify crucial determinant, the statistical (correlation analysis on the data set of more than 18.000 auction items with different configuration parameters was conducted. Findings suggest that the more bidders are invited to the eRA, the better results could be expected. Additionally, the complexity of the eRA parameterization does not seem to influent the success of the eRA. These results can influence usage and SW development of eRA application in real environment. This research extends already realized studies in the field of electronic auctions for the B2B processes

  8. Creating sound and reversible configurable process models using CoSeNets

    NARCIS (Netherlands)

    Schunselaar, D.M.M.; Verbeek, H.M.W.; Aalst, van der W.M.P.; Reijers, H.A.; Abramowicz, W.; Kriksciuniene, D.; Sakalauskas, V.

    2012-01-01

    All Dutch municipalities offer the same range of services, and the processes delivering these services are quite similar. Therefore, these municipalities can benefit from configurable process models. This requires the merging of existing process variants into configurable models. Unfortunately,

  9. The Network Configuration of an Object Relational Database Management System

    Science.gov (United States)

    Diaz, Philip; Harris, W. C.

    2000-01-01

    The networking and implementation of the Oracle Database Management System (ODBMS) requires developers to have knowledge of the UNIX operating system as well as all the features of the Oracle Server. The server is an object relational database management system (DBMS). By using distributed processing, processes are split up between the database server and client application programs. The DBMS handles all the responsibilities of the server. The workstations running the database application concentrate on the interpretation and display of data.

  10. Evaluating the Potential of Commercial GIS for Accelerator Configuration Management

    International Nuclear Information System (INIS)

    Larrieu, T.L.; Roblin, Y.R.; White, K.; Slominski, R.

    2005-01-01

    The Geographic Information System (GIS) is a tool used by industries needing to track information about spatially distributed assets. A water utility, for example, must know not only the precise location of each pipe and pump, but also the respective pressure rating and flow rate of each. In many ways, an accelerator such as CEBAF (Continuous Electron Beam Accelerator Facility) can be viewed as an ''electron utility''. Whereas the water utility uses pipes and pumps, the ''electron utility'' uses magnets and RF cavities. At Jefferson lab we are exploring the possibility of implementing ESRI's ArcGIS as the framework for building an all-encompassing accelerator configuration database that integrates location, configuration, maintenance, and connectivity details of all hardware and software. The possibilities of doing so are intriguing. From the GIS, software such as the model server could always extract the most-up-to-date layout information maintained by the Survey and Alignment for lattice modeling. The Mechanical Engineering department could use ArcGIS tools to generate CAD drawings of machine segments from the same database. Ultimately, the greatest benefit of the GIS implementation could be to liberate operators and engineers from the limitations of the current system-by-system view of machine configuration and allow a more integrated regional approach. The commercial GIS package provides a rich set of tools for database-connectivity, versioning, distributed editing, importing and exporting, and graphical analysis and querying, and therefore obviates the need for much custom development. However, formidable challenges to implementation exist and these challenges are not only technical and manpower issues, but also organizational ones. The GIS approach would crosscut organizational boundaries and require departments, which heretofore have had free reign to manage their own data, to cede some control and agree to a centralized framework

  11. Evaluating the Potential of Commercial GIS for Accelerator Configuration Management

    Energy Technology Data Exchange (ETDEWEB)

    T.L. Larrieu; Y.R. Roblin; K. White; R. Slominski

    2005-10-10

    The Geographic Information System (GIS) is a tool used by industries needing to track information about spatially distributed assets. A water utility, for example, must know not only the precise location of each pipe and pump, but also the respective pressure rating and flow rate of each. In many ways, an accelerator such as CEBAF (Continuous Electron Beam Accelerator Facility) can be viewed as an ''electron utility''. Whereas the water utility uses pipes and pumps, the ''electron utility'' uses magnets and RF cavities. At Jefferson lab we are exploring the possibility of implementing ESRI's ArcGIS as the framework for building an all-encompassing accelerator configuration database that integrates location, configuration, maintenance, and connectivity details of all hardware and software. The possibilities of doing so are intriguing. From the GIS, software such as the model server could always extract the most-up-to-date layout information maintained by the Survey & Alignment for lattice modeling. The Mechanical Engineering department could use ArcGIS tools to generate CAD drawings of machine segments from the same database. Ultimately, the greatest benefit of the GIS implementation could be to liberate operators and engineers from the limitations of the current system-by-system view of machine configuration and allow a more integrated regional approach. The commercial GIS package provides a rich set of tools for database-connectivity, versioning, distributed editing, importing and exporting, and graphical analysis and querying, and therefore obviates the need for much custom development. However, formidable challenges to implementation exist and these challenges are not only technical and manpower issues, but also organizational ones. The GIS approach would crosscut organizational boundaries and require departments, which heretofore have had free reign to manage their own data, to cede some control and agree to a

  12. Configuration of management accounting information system for multi-stage manufacturing

    Science.gov (United States)

    Mkrtychev, S. V.; Ochepovsky, A. V.; Enik, O. A.

    2018-05-01

    The article presents an approach to configuration of a management accounting information system (MAIS) that provides automated calculations and the registration of normative production losses in multi-stage manufacturing. The use of MAIS with the proposed configuration at the enterprises of textile and woodworking industries made it possible to increase the accuracy of calculations for normative production losses and to organize accounting thereof with the reference to individual stages of the technological process. Thus, high efficiency of multi-stage manufacturing control is achieved.

  13. Software Configuration Management For Multiple Releases: Influence On Development Effort

    Directory of Open Access Journals (Sweden)

    Sławomir P. Maludziński

    2007-01-01

    Full Text Available Software Configuration Management (SCM evolves together with the discipline of softwareengineering. Teams working on software products become larger and are geographically distributedat multiple sites. Collaboration between such groups requires well evaluated SCMplans and strategies to easy cooperation and decrease software development cost by reducingtime spent on SCM activities – branching and merging, that is effort utilized on creation ofrevisions (’serial’ versions and variants (’parallel’ versions. This paper suggests that SCMpractices should be combined with modular design and code refactoring to reduce cost relatedto maintenance of the same code line. Teams which produce several variants of thesame code line at the same time should use approaches like components, modularization, orplug-ins over code alternations maintained on version branches. Findings described in thispaper were taken by teams in charge of development of radio communication systems inMotorola GEMS divisions. Each team collaborating on similar projects used different SCMstrategies to develop parts of this system.

  14. Configuration management of plant modifications for nuclear power plants

    International Nuclear Information System (INIS)

    Ritsch, W.J.

    1987-01-01

    Due to the increasing complexity of nuclear power plant operation, regulatory pressure, and the large numbers of people required to operate and support the stations, the control of plant modifications at these plants needs to be expanded and improved. The aerospace and defense industries, as well as the owners or operators of large energy projects have established configuration management programs (CMPs) to control plant design changes. These programs are composed of well-defined functions for identifying, evaluating, recording, tracking, issuing, and documenting the established baseline conditions, as well as required changes to these baseline conditions. The purpose of this paper is to describe a recommended CMP for plant modifications consisting of a computerized data base installed on the utility's computer to provide a central storage of plant design and operations data necessary to control the following activities as they are affected by plant design changes: training; record management; operations; maintenance; health physics; planning/scheduling; procurement/inventory control; outage management (including modifications); and emergency response

  15. Nuclear plant operations, maintenance, and configuration management using three-dimensional computer graphics and databases

    International Nuclear Information System (INIS)

    Tutos, N.C.; Reinschmidt, K.F.

    1987-01-01

    Stone and Webster Engineering Corporation has developed the Plant Digital Model concept as a new approach to Configuration Mnagement of nuclear power plants. The Plant Digital Model development is a step-by-step process, based on existing manual procedures and computer applications, and is fully controllable by the plant managers and engineers. The Plant Digital Model is based on IBM computer graphics and relational database management systems, and therefore can be easily integrated with existing plant databases and corporate management-information systems

  16. Configuration management plan for Machine Interface Test System (MITS)

    International Nuclear Information System (INIS)

    O'Neill, C.K.

    1980-01-01

    The discipline required by this plan will apply from the establishment of a configuration baseline until completion of the final test in the MITS. The plan applies to configured items of hardware and software as well as to the specifications and drawings for these items. The plan encompasses establishment of the facility baseline, interface definition, classes of change, change control, change paper, organizational responsibilities and relationships, test configuration (as opposed to facility), and configuration data retention

  17. Smart Management in Effective Schools: Effective Management Configurations in General and Vocational Education in the Netherlands

    Science.gov (United States)

    Hofman, W. H. Adriaan; Hofman, Roelande H.

    2011-01-01

    Purpose: In this study the authors focus on different (configurations of) leadership or management styles in schools for general and vocational education. Findings: Using multilevel (students and schools) analyses, strong differences in effective management styles between schools with different student populations were observed. Conclusions: The…

  18. Dynamic processes in field-reversed-configuration compact toroids

    International Nuclear Information System (INIS)

    Rej, D.J.

    1987-01-01

    In this lecture, the dynamic processes involved in field-reversed configuration (FRC) formation, translation, and compression will be reviewed. Though the FRC is related to the field-reversed mirror concept, the formation method used in most experiments is a variant of the field-reversed Θ-pinch. Formation of the FRC eqilibrium occurs rapidly, usually in less than 20 μs. The formation sequence consists of several coupled processes: preionization; radial implosion and compression; magnetic field line closure; axial contraction; equilibrium formation. Recent experiments and theory have led to a significantly improved understanding of these processes; however, the experimental method still relies on a somewhat empirical approach which involves the optimization of initial preionization plasma parameters and symmetry. New improvements in FRC formation methods include the use of lower voltages which extrapolate better to larger devices. The axial translation of compact toroid plasmas offers an attractive engineering convenience in a fusion reactor. FRC translation has been demonstrated in several experiments worldwide, and these plasmas are found to be robust, moving at speeds up to the Alfven velocity over distances of up to 16 m, with no degradation in the confinement. Compact toroids are ideal for magnetic compression. Translated FRCs have been compressed and heated by imploding liners. Upcoming experiments will rely on external flux compression to heat a translater FRC at 1-GW power levels. 39 refs

  19. Process management practice

    International Nuclear Information System (INIS)

    Pyeon, In Beom

    1983-04-01

    This book gives descriptions of qualifying subject and test scope like production plan and control, economic feasibility, process management, quality management and operations research, industrial economics like materials and marketing management, production management such as meaning and goals of process management and production plan and control, basic economic concept, official interest and equivalence, and depreciation, and OR concept such as network analysis and PERT CPM and stimulation.

  20. Guidelines for evaluating software configuration management plans for digital instrumentation and control systems

    International Nuclear Information System (INIS)

    Cheon, Se Woo; Park, Jong Kyun; Lee, Ki Young; Lee, Jang Soo; Kim, Jang Yeon

    2001-08-01

    Software configuration management (SCM) is the process for identifying software configuration items (CIs), controlling the implementation and changes to software, recording and reporting the status of changes, and verifying the completeness and correctness of the released software. SCM consists of two major aspects: planning and implementation. Effective SCM involves planning for how activities are to be performed, and performing these activities in accordance with the Plan. This report first reviews the background of SCM that include key standards, SCM disciplines, SCM basic functions, baselines, software entity, SCM process, the implementation of SCM, and the tools of SCM. In turn, the report provides the guidelines for evaluating the SCM Plan for digital I and C systems of nuclear power plants. Most of the guidelines in the report are based on IEEE Std 828 and ANSI/IEEE Std 1042. According to BTP-14, NUREG-0800, the evaluation topics on the SCM Plan is classified into three categories: management, implementation, and resource characteristics

  1. Computer software configuration management plan for 200 East/West Liquid Effluent Facilities

    Energy Technology Data Exchange (ETDEWEB)

    Graf, F.A. Jr.

    1995-02-27

    This computer software management configuration plan covers the control of the software for the monitor and control system that operates the Effluent Treatment Facility and its associated truck load in station and some key aspects of the Liquid Effluent Retention Facility that stores condensate to be processed. Also controlled is the Treated Effluent Disposal System`s pumping stations and monitors waste generator flows in this system as well as the Phase Two Effluent Collection System.

  2. Computer software configuration management plan for 200 East/West Liquid Effluent Facilities

    International Nuclear Information System (INIS)

    Graf, F.A. Jr.

    1995-01-01

    This computer software management configuration plan covers the control of the software for the monitor and control system that operates the Effluent Treatment Facility and its associated truck load in station and some key aspects of the Liquid Effluent Retention Facility that stores condensate to be processed. Also controlled is the Treated Effluent Disposal System's pumping stations and monitors waste generator flows in this system as well as the Phase Two Effluent Collection System

  3. Tank waste remediation system privatization infrastructure program configuration management implementation plan

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This Configuration Management Implementation Plan (CMIP) was developed to assist in managing systems, structures, and components (SSCS), to facilitate the effective control and statusing of changes to SSCS, and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Privatization Infrastructure will take in implementing a configuration management program, to identify the Program's products that need configuration management control, to determine the rigor of control, and to identify the mechanisms for that control

  4. Project management process.

    Science.gov (United States)

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  5. The Software Life-Cycle Based Configuration Management Tasks for the KNICS Project

    International Nuclear Information System (INIS)

    Cheon, Se Woo; Kwon, Kee Choon

    2005-01-01

    Software configuration management (SCM) is an activity, which configures the form of a software system (e.g., design documents and programs) and systematically manages and controls the modifications used to compile the plans, development, and operations resulting from software development and maintenance. The SCM tool, NuSCM, has been specifically developed for the software life-cycle configuration management of developing the KNICS plant protection system (PPS). This paper presents the application of NuSCM to the KNICS project

  6. Earth Observatory Satellite system definition study. Report no. 3: Design/cost tradeoff studies. Appendix D: EOS configuration design data. Part 2: Data management system configuration

    Science.gov (United States)

    1974-01-01

    The Earth Observatory Satellite (EOS) data management system (DMS) is discussed. The DMS is composed of several subsystems or system elements which have basic purposes and are connected together so that the DMS can support the EOS program by providing the following: (1) payload data acquisition and recording, (2) data processing and product generation, (3) spacecraft and processing management and control, and (4) data user services. The configuration and purposes of the primary or high-data rate system and the secondary or local user system are explained. Diagrams of the systems are provided to support the systems analysis.

  7. National waste terminal storage program: configuration management plan. Volume I. Management summary

    International Nuclear Information System (INIS)

    1977-05-01

    Objective of the Configuration Management Plan is to describe the Office of Waste Isolation's approach for the systematic identification, change control, status accounting, and auditing of: documents defining the NWTS Program and the plans for attaining the defined objectives; physical and functional characteristics of each storage site, facility, systems and equipment; and associated costs and schedules

  8. Management oriented process

    International Nuclear Information System (INIS)

    2004-01-01

    ANAV decided to implement process-oriented management by adopting the U. S. NEI (Nuclear Electric Industry) model. The article describes the initial phases of the project, its current status and future prospects. The project has been considered as an improvement in the areas of organization and human factors. Recently, IAEA standard drafts are including processes as an accepted management model. (Author)

  9. XCPU2 process management system

    Energy Technology Data Exchange (ETDEWEB)

    Ionkov, Latchesar [Los Alamos National Laboratory; Van Hensbergen, Eric [IBM AUSTIN RESEARCH LAB

    2009-01-01

    Xcpu2 is a new process management system that allows the users to specify custom file system for a running job. Most cluster management systems enforce single software distribution running on all nodes. Xcpu2 allows programs running on the cluster to work in environment identical to the user's desktop, using the same versions of the libraries and tools the user installed locally, and accessing the configuration file in the same places they are located on the desktop. Xcpu2 builds on our earlier work with the Xcpu system. Like Xcpu, Xcpu2's process management interface is represented as a set of files exported by a 9P file server. It supports heterogeneous clusters and multiple head nodes. Unlike Xcpu, it uses pull instead of push model. In this paper we describe the Xcpu2 clustering model, its operation and how the per-job filesystem configuration can be used to solve some of the common problems when running a cluster.

  10. Business process quality management

    NARCIS (Netherlands)

    Reijers, H.A.; Mendling, J.; Recker, J.; Brocke, vom J.; Rosemann, M.

    2010-01-01

    Abstract Process modeling is a central element in any approach to Business Process Management (BPM). However, what hinders both practitioners and aca demics is the lack of support for assessing the quality of process models — let alone realizing high quality process models. Existing frameworks are

  11. How to Configurate Oracle Enterprise Manager on Windows 2000 Server

    Institute of Scientific and Technical Information of China (English)

    2001-01-01

    Oracle Enterprise Manager is a system management tool, which provides an integrated solution for centrally managing your heterogeneous environment Servers. Enterprise Manager combines a graphical Console, Oracle Management Servers, Oracle Intelligent Agents, common services, and tools to provide an integrated, comprehensive systems management platform for managing Oracle products, and is comprised of such as Data

  12. Creating a strategic plan for configuration management using computer aided software engineering (CASE) tools

    International Nuclear Information System (INIS)

    Smith, P.R.; Sarfaty, R.

    1993-01-01

    This paper provides guidance in the definition, documentation, measurement, enhancement of processes, and validation of a strategic plan for configuration management (CM). The approach and methodology used in establishing a strategic plan is the same for any enterprise, including the Department of Energy (DOE), commercial nuclear plants, the Department of Defense (DOD), or large industrial complexes. The principles and techniques presented are used world wide by some of the largest corporations. The authors used industry knowledge and the areas of their current employment to illustrate and provide examples. Developing a strategic configuration and information management plan for DOE Idaho Field Office (DOE-ID) facilities is discussed in this paper. A good knowledge of CM principles is the key to successful strategic planning. This paper will describe and define CM elements, and discuss how CM integrates the facility's physical configuration, design basis, and documentation. The strategic plan does not need the support of a computer aided software engineering (CASE) tool. However, the use of the CASE tool provides a methodology for consistency in approach, graphics, and database capability combined to form an encyclopedia and a method of presentation that is easily understood and aids the process of reengineering. CASE tools have much more capability than those stated above. Some examples are supporting a joint application development group (JAD) to prepare a software functional specification document and, if necessary, provide the capability to automatically generate software application code. This paper briefly discusses characteristics and capabilities of two CASE tools that use different methodologies to generate similar deliverables

  13. The configurational approach in supply chain management (SCM) of steel goods

    OpenAIRE

    Dohn, K.

    2014-01-01

    A basic element of supply chain management is the holistic or system view. Following this perspective supply chain management has to analyse the supply chain as a whole and must not only concentrate on details or specific elements. The configurational approach is one method for realizing this. The article analyses how the configurational approach can be applied in SCM of steel goods.

  14. Project B610 process control configuration acceptance test report

    International Nuclear Information System (INIS)

    Silvan, G.R.

    1995-01-01

    The purpose of this test is to verify the Westinghouse configuration of the MICON A/S Distributed Control System for project B610. The following will be verified: (1) proper assignment and operation of all field inputs to and outputs from the MICON Termination panels; (2) proper operation of all display data on the operators' console; (3) proper operation of all required alarms; and (4) proper operation of all required interlocks. This test only verifies the proper operation of the Westinghouse control configuration (or program). It will not be responsible for verifying proper operation of the MICON hardware or operating software. Neither does it test any of the B610 instrument. The MICON hardware and software has been tested as part of the equipment procurement. Instrumentation and wiring installed under project B620 will be tested under a separate functional test. In some cases, precise transmitter ranges, alarm setpoints, and controller tuning parameters are not available at this time. Therefore, approximate values are used during the test. This should not affect the proper operation of the configuration or the validity of this test. Final values will be assigned during operability testing

  15. V-Model based Configuration Management Program for New-Build Nuclear Power Plant

    Energy Technology Data Exchange (ETDEWEB)

    An, Kyungik [PartDB Co. Ltd., Daejeon (Korea, Republic of); Cho, Yoon Sang [KHNP Co. Ltd., Daejeon (Korea, Republic of); Freeland, Kent R. [Industrial Analysts Incorporated, New Hampshire (United States)

    2014-05-15

    As NPP operators undertook design basis reconstitution efforts, they began to realize that the design basis is a foundation for Configuration Management (CM). This realization was made evident in the magnitude of the problems that were being observed. This experience also raised serious questions about how the information being developed to produce the design basis documents would be kept up to date in the future. A process to reconstitute the design basis is likely to be ineffective if CM controls are not in place. The right IT solution for CM depends upon a number of factors, including the nuclear power plant culture, budget, target technology, and the nuclear power plant owner/operator's standards, requirements and limitations for its generating fleet. Comprehensive CM Program for NPP is the single greatest strategy to meet the commitment to nuclear excellence. The safety and viability of nuclear power, particularly at the fleet level, depends upon the development of positive design control and design basis to better understanding plant operating dynamics and margin management, along with technology to control the realization of such design in the physical plant. However the most of plant facilities are modified many times, often without suitable support needed to confirm with their design base and to update their engineering data, maintenance rules and operating procedures. This lack of equilibrium between the requirements, design information and physical plant still remains a important issue. This study focuses on how to manage the configuration information of NPP using systems engineering V-model approach, and proposes data model to manage the configuration information in relation to manage their life cycle. Comprehensive CM Program and IMS for NPP life cycle support is the greatest strategy to meet the commitment to nuclear safety.

  16. The Information System for Operational Activity Organization as a Tool for Configuration Management in NPP

    International Nuclear Information System (INIS)

    Manchev, B. L.; Yordanova, V. S.; Nenkova, B. G.

    2008-01-01

    The Configuration Management (CM) is an integrated management process by means of which conformity between design requirements, physical configuration and the plant documentation is ascertained. This conformity is maintained during the entire life cycle of the facility. CM ensures that during the entire operational life of the plant the following requirements are met: The basic design requirements of the plant are established, documented and maintained; The physical structures, systems and components (SSC) of the plant are in conformity with the design requirements; The physical and functional characteristics of the plant are correctly incorporated in the operational documentation and the documentation for repair, as well as in the documents for tests and training; The changes in the design documentation are incorporated in the physical configuration and the operative documentation; The changes in the design are minimized by management process for review according to approved criteria; The changes proposed in the equipment and documentation of the plant are estimated entirely with the purpose of determining their effect and are reviewed and approved by appropriate managing staff before their introduction. The information system for organization of the operational activity (IS OOA) consists of several modules used for storage and retrieval of data for different aspects of the operation of the equipment at the site of Kozloduy NPP, as defects and failures, design requirements and bases, design data and characteristics, tests, life time, maintenance and repair, as well as changes in the design or the design documentation. IS OOA consists of single relational database and provides built-in connections to the database of the SmartDoc system for control of the documentation, as well as to the database for human resources. Central place in IS OOA is taken by the 'Equipment' module while all other modules are connected with the identification data of the structures

  17. Process Management Plans

    Directory of Open Access Journals (Sweden)

    Tomasz Miksa

    2014-07-01

    Full Text Available In the era of research infrastructures and big data, sophisticated data management practices are becoming essential building blocks of successful science. Most practices follow a data-centric approach, which does not take into account the processes that created, analysed and presented the data. This fact limits the possibilities for reliable verification of results. Furthermore, it does not guarantee the reuse of research, which is one of the key aspects of credible data-driven science. For that reason, we propose the introduction of the new concept of Process Management Plans, which focus on the identification, description, sharing and preservation of the entire scientific processes. They enable verification and later reuse of result data and processes of scientific experiments. In this paper we describe the structure and explain the novelty of Process Management Plans by showing in what way they complement existing Data Management Plans. We also highlight key differences, major advantages, as well as references to tools and solutions that can facilitate the introduction of Process Management Plans.

  18. Tank waste remediation system immobilized high-level waste storage project configuration management implementation plan

    International Nuclear Information System (INIS)

    Burgard, K.G.; Schaus, P.S.; Rossi, H.

    1998-01-01

    This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control.This Configuration Management Implementation Plan was developed to assist in the management of systems, structures, and components, to facilitate the effective control and statusing of changes to systems, structures, and components; and to ensure technical consistency between design, performance, and operational requirements. Its purpose is to describe the approach Project W-464 will take in implementing a configuration management control, to determine the rigor of control, and to identify the mechanisms for imposing that control

  19. PROJECT SCOPE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Yana Derenskaya

    2018-01-01

    Full Text Available The purpose of the article is to define the essence of project scope management process, its components, as well as to develop an algorithm of project scope management in terms of pharmaceutical production. Methodology. To carry out the study, available information sources on standards of project management in whole and elements of project scope management in particular are analysed. Methods of system and structural analysis, logical generalization are used to study the totality of subprocesses of project scope management, input and output documents, and to provide each of them. Methods of network planning are used to construct a precedence diagram of project scope management process. Results of the research showed that components of the project scope management are managing the scope of the project product and managing the content of project work. It is the second component is investigated in the presented work as a subject of research. Accordingly, it is defined that project scope management process is to substantiate and bring to the realization the necessary amount of work that ensures the successful implementation of the project (achievement of its goal and objectives of individual project participants. It is also determined that the process of managing the project scope takes into account the planning, definition of the project scope, creation of the structure of project work, confirmation of the scope and management of the project scope. Participants of these subprocesses are: customer, investor, and other project participants – external organizations (contractors of the project; project review committee; project manager and project team. It is revealed that the key element of planning the project scope is the formation of the structure of design work, the justification of the number of works, and the sequence of their implementation. It is recommended to use the following sequence of stages for creating the structure of project work

  20. Managing Software Process Evolution

    DEFF Research Database (Denmark)

    This book focuses on the design, development, management, governance and application of evolving software processes that are aligned with changing business objectives, such as expansion to new domains or shifting to global production. In the context of an evolving business world, it examines...... the complete software process lifecycle, from the initial definition of a product to its systematic improvement. In doing so, it addresses difficult problems, such as how to implement processes in highly regulated domains or where to find a suitable notation system for documenting processes, and provides...... essential insights and tips to help readers manage process evolutions. And last but not least, it provides a wealth of examples and cases on how to deal with software evolution in practice. Reflecting these topics, the book is divided into three parts. Part 1 focuses on software business transformation...

  1. Configuration management manual as a tool for improving plant change controls

    International Nuclear Information System (INIS)

    Craig, L.L.

    1991-01-01

    Early vintage plants, such as Turkey Point at Florida Power and Light (FP and L) Company, were not provided with as much design documentation as later plants. At FP and L, programs were initiated to reconstruct the design bases, correct and update drawings at Turkey Point, and develop an overall configuration management program for both Turkey Point and St. Lucie plants. This paper discusses the Configuration Management Manual developed by plant and engineering personnel, which is used to train personnel to a common language and achieve better understanding of individual impact on configuration management

  2. Fundamental attributes of a practical configuration management program for nuclear plant design control

    International Nuclear Information System (INIS)

    Klein, S.M.

    1988-06-01

    This summarizes the results of an evaluation of findings identifies during a number of Safety-System Functional Inspections and Safety System Outage Modification Inspections which are related to configuration management for nuclear plant design control. A computerized database of these findings was generated from a review of the design inspection reports. Based on the results of the evaluation, attributes of a configuration management program were developed which are responsive to minimizing these types of inspection findings. Incorporation of these key attributes is considered good practice in the development of a configuration management program for design control at operating nuclear plants

  3. Benefits Assessment for Single-Airport Tactical Runway Configuration Management Tool (TRCM)

    Science.gov (United States)

    Oseguera-Lohr, Rosa; Phojanamonogkolkij, Nipa; Lohr, Gary W.

    2015-01-01

    The System-Oriented Runway Management (SORM) concept was developed as part of the Airspace Systems Program (ASP) Concepts and Technology Development (CTD) Project, and is composed of two basic capabilities: Runway Configuration Management (RCM), and Combined Arrival/Departure Runway Scheduling (CADRS). RCM is the process of designating active runways, monitoring the active runway configuration for suitability given existing factors, and predicting future configuration changes; CADRS is the process of distributing arrivals and departures across active runways based on local airport and National Airspace System (NAS) goals. The central component in the SORM concept is a tool for taking into account all the various factors and producing a recommendation for what would be the optimal runway configuration, runway use strategy, and aircraft sequence, considering as many of the relevant factors required in making this type of decision, and user preferences, if feasible. Three separate tools were initially envisioned for this research area, corresponding to the time scale in which they would operate: Strategic RCM (SRCM), with a planning horizon on the order of several hours, Tactical RCM (TRCM), with a planning horizon on the order of 90 minutes, and CADRS, with a planning horizon on the order of 15-30 minutes[1]. Algorithm development was initiated in all three of these areas, but the most fully developed to date is the TRCM algorithm. Earlier studies took a high-level approach to benefits, estimating aggregate benefits across most of the major airports in the National Airspace Systems (NAS), for both RCM and CADRS [2]. Other studies estimated the benefit of RCM and CADRS using various methods of re-sequencing arrivals to reduce delays3,4, or better balancing of arrival fixes5,6. Additional studies looked at different methods for performing the optimization involved in selecting the best Runway Configuration Plan (RCP) to use7-10. Most of these previous studies were high

  4. Process of establishing design requirements and selecting alternative configurations for conceptual design of a VLA

    Directory of Open Access Journals (Sweden)

    Bo-Young Bae

    2017-04-01

    Full Text Available In this study, a process for establishing design requirements and selecting alternative configurations for the conceptual phase of aircraft design has been proposed. The proposed process uses system-engineering-based requirement-analysis techniques such as objective tree, analytic hierarchy process, and quality function deployment to establish logical and quantitative standards. Moreover, in order to perform a logical selection of alternative aircraft configurations, it uses advanced decision-making methods such as morphological matrix and technique for order preference by similarity to the ideal solution. In addition, a preliminary sizing tool has been developed to check the feasibility of the established performance requirements and to evaluate the flight performance of the selected configurations. The present process has been applied for a two-seater very light aircraft (VLA, resulting in a set of tentative design requirements and two families of VLA configurations: a high-wing configuration and a low-wing configuration. The resulting set of design requirements consists of three categories: customer requirements, certification requirements, and performance requirements. The performance requirements include two mission requirements for the flight range and the endurance by reflecting the customer requirements. The flight performances of the two configuration families were evaluated using the sizing tool developed and the low-wing configuration with conventional tails was selected as the best baseline configuration for the VLA.

  5. The TBM-CA configuration management approach for the ITER test blanket module - application to the HCLL TBS

    International Nuclear Information System (INIS)

    Jourd'Heuil, L.; Panayotov, D.; Salavy, J.-F.; Storto, C.; Colombo, M.; Sardain, P.

    2011-01-01

    The European Test Blanket Modules (EU-TBM) are first prototypes of a fusion reactor breeding blanket. They will be tested in dedicated equatorial ports n o 16 of ITER. Technical developments are performed by a Consortium of European Associates (TBM-CA) and supported within the framework of F4E agency. Designing a complex nuclear system like TBM for ITER necessitates an organizational structure inside the consortium to manage in permanence the coherence between requirements (F4E technical and management specifications) and the TBM development through their life time. At the present stage, evolutionary nature of the design from the different teams is important. Highest priority is assigned to the Management support and Design Integration Team (MDIT) to perform an efficient control of the Configuration Management (CM). The TBM-CA CM comprises 4 main processes: a) identifying configuration of a product characteristics, including its interfaces (Configuration identification), b) controlling the evolution from agreed baseline (Configuration Control), c) creating the knowledge database in order to manage the information all along the lifecycle of the items (Configuration status accounting) and d) verifying the current configuration status of the items (Audits). CM is then a powerful tool to link the requirements for engineering, safety, quality assurance and test and acceptance activities. The application of the CM approach is illustrated through the case of TBM-HCLL (Helium Cooled Lithium Lead). The result shows that the proposed methodology and tools are suitable and provide quality solution for the items with a complex configuration such as TBM HCLL.

  6. Technology Evaluation of Process Configurations for Second Generation Bioethanol Production using Dynamic Model-based Simulations

    DEFF Research Database (Denmark)

    Morales Rodriguez, Ricardo; Meyer, Anne S.; Gernaey, Krist

    2011-01-01

    An assessment of a number of different process flowsheets for bioethanol production was performed using dynamic model-based simulations. The evaluation employed diverse operational scenarios such as, fed-batch, continuous and continuous with recycle configurations. Each configuration was evaluated...... against the following benchmark criteria, yield (kg ethanol/kg dry-biomass), final product concentration and number of unit operations required in the different process configurations. The results has shown the process configuration for simultaneous saccharification and co-fermentation (SSCF) operating...... in continuous mode with a recycle of the SSCF reactor effluent, results in the best productivity of bioethanol among the proposed process configurations, with a yield of 0.18 kg ethanol /kg dry-biomass....

  7. TECHNOLOGY MANAGEMENT PROCESS FRAMEWORK

    Directory of Open Access Journals (Sweden)

    Ikura Yamamoto

    2012-02-01

    Full Text Available The effective management of technology as a source of competitive advantage is of vital importance for many organizations. It is necessary to understand, communicate and integrate technology strategy with marketing, financial, operations and human resource strategies. This is of particular importance when one considers the increasing cost, pace and complexity of technology developments, combined with shortening product life cycles. A five process model provides a framework within which technology management activities can be understood: identification, selection, acquisition, exploitation and protection. Based on this model, a technology management assessment procedure has been developed, using an ``action research’’ approach. This paper presents an industrial case study describing the first full application of the procedure within a high-volume manufacturing business. The impact of applying the procedure is assessed in terms of benefits to the participating business, together with improvements to the assessment procedure itself, in the context of the action research framework. Keyword: Technology, Strategy, Management, Assessment

  8. Networked business process management

    NARCIS (Netherlands)

    Grefen, P.W.P.J.

    2013-01-01

    In the current economy, a shift can be seen from stand-alone business organizations to networks of tightly collaborating business organizations. To allow this tight collaboration, business process management in these collaborative networks is becoming increasingly important. This paper discusses

  9. Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers

    International Nuclear Information System (INIS)

    DALE, R.N.

    2000-01-01

    Long Length Contaminated Equipment Removal System Receiver Trailer and Transport Trailer require a configuration management plan for design, requirements and operations baseline documents. This report serves as the plan for the Trailers

  10. Implementation of Successful Practices Using an Iterative Development Methodology for an AEGIS Configuration Management Software Application

    National Research Council Canada - National Science Library

    Colston, Sharon

    1998-01-01

    This paper documents a two-and-a-half year software development project of the Combat Systems Configuration Management Branch of the Combat Systems Department at Naval Surface Warfare Center, Dahlgren Division (NSWCDD...

  11. 77 FR 50727 - Configuration Management Plans for Digital Computer Software Used in Safety Systems of Nuclear...

    Science.gov (United States)

    2012-08-22

    ... enhanced consensus practices for planning software configuration management (SCM) as described in the... testing of structures, systems, and components important to safety throughout the life of the unit. This...

  12. The configurational approach in supply chain management (SCM of steel goods

    Directory of Open Access Journals (Sweden)

    K. Dohn

    2014-04-01

    Full Text Available A basic element of supply chain management is the holistic or system view. Following this perspective supply chain management has to analyse the supply chain as a whole and must not only concentrate on details or specific elements. The configurational approach is one method for realizing this. The article analyses how the configurational approach can be applied in SCM of steel goods.

  13. Fundamentals of business process management

    NARCIS (Netherlands)

    Dumas, Marlon; La Rosa, Marcello; Mendling, Jan; Reijers, Hajo A.

    2018-01-01

    This textbook covers the entire Business Process Management (BPM) lifecycle, from process identification to process monitoring, covering along the way process modelling, analysis, redesign and automation. Concepts, methods and tools from business management, computer science and industrial

  14. Software configuration management plan, 241-AY and 241-AZ tank farm MICON automation system

    International Nuclear Information System (INIS)

    Hill, L.F.

    1997-01-01

    This document establishes a Computer Software Configuration Management Plan (CSCM) for controlling software for the MICON Distributed Control System (DCS) located at the 241-AY and 241-AZ Aging Waste Tank Farm facilities in the 200 East Area. The MICON DCS software controls and monitors the instrumentation and equipment associated with plant systems and processes. A CSCM identifies and defines the configuration items in a system (section 3.1), controls the release and change of these items throughout the system life cycle (section 3.2), records and reports the status of configuration items and change requests (section 3.3), and verifies the completeness and correctness of the items (section 3.4). All software development before initial release, or before software is baselined, is considered developmental. This plan does not apply to developmental software. This plan applies to software that has been baselined and released. The MICON software will monitor and control the related instrumentation and equipment of the 241-AY and 241-AZ Tank Farm ventilation systems. Eventually, this software may also assume the monitoring and control of the tank sludge washing equipment and other systems as they are brought on line. This plan applies to the System Cognizant Manager and MICON Cognizant Engineer (who is also referred to herein as the system administrator) responsible for the software/hardware and administration of the MICON system. This document also applies to any other organizations within Tank Farms which are currently active on the system including system cognizant engineers, nuclear operators, technicians, and control room supervisors

  15. Managing intellectual capital through a proper building configuration

    NARCIS (Netherlands)

    Appel - Meulenbroek, H.A.J.A.

    2013-01-01

    This paper takes a look at a totally different type of resource to improve the management of intellectual capital because it describes the physical work environment instead of the more often studied organisational/social work environment. It identifies physical aspects that stimulate both sharing

  16. Business process configuration in the cloud: how to support and analyze multi-tenant processes?

    NARCIS (Netherlands)

    Aalst, van der W.M.P.; Zavattaro, G.; Schreier, U.; Pautasso, C.

    2011-01-01

    Lion's share of cloud research has been focusing on performance related problems. However, cloud computing will also change the way in which business processes are managed and supported, e.g., more and more organizations will be sharing common processes. In the classical setting, where product

  17. Saltwell PIC Skid Programmable Logic Controller (PLC) Software Configuration Management Plan

    International Nuclear Information System (INIS)

    KOCH, M.R.

    1999-01-01

    This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell PIC Skids as required by LMH-PRO-309/Rev. 0, Computer Software Quality Assurance, Section 2.6, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell PIC Skid Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell PIC Skid PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis

  18. Saltwell Leak Detector Station Programmable Logic Controller (PLC) Software Configuration Management Plan (SCMP)

    International Nuclear Information System (INIS)

    WHITE, K.A.

    2000-01-01

    This document provides the procedures and guidelines necessary for computer software configuration management activities during the operation and maintenance phases of the Saltwell Leak Detector Stations as required by HNF-PRO-309/Rev.1, Computer Software Quality Assurance, Section 2.4, Software Configuration Management. The software configuration management plan (SCMP) integrates technical and administrative controls to establish and maintain technical consistency among requirements, physical configuration, and documentation for the Saltwell Leak Detector Station Programmable Logic Controller (PLC) software during the Hanford application, operations and maintenance. This SCMP establishes the Saltwell Leak Detector Station PLC Software Baseline, status changes to that baseline, and ensures that software meets design and operational requirements and is tested in accordance with their design basis

  19. Business process management: a survey

    NARCIS (Netherlands)

    Aalst, van der W.M.P.; Hofstede, ter A.H.M.; Weske, M.H.; Aalst, van der W.M.P.; Hofstede, ter A.H.M.; Weske, M.H.

    2003-01-01

    Business Process Management (BPM) includes methods, techniques, and tools to support the design, enactment, management, and analysis of operational business processes. It can be considered as an extension of classical Workflow Management (WFM) systems and approaches. Although the practical relevance

  20. Six sigma implementation and its effects on configuration management related to metal industry

    International Nuclear Information System (INIS)

    Tariq, M.M.; Ahmad, S.F.; Mahmoo, A.; Kalsoom, T.

    2006-01-01

    This paper discusses the implementation of Six Sigma and its effects on Configuration Management (CM) of metal industry. The basic idea behind the Six Sigma philosophy is to continuously reduce product and process variation. Design for Six Sigma (DFSS) methodology generates new processes, products, services, plants, etc., whereas Define, Measure, Analyze, Improve and Control (DMAIC) methodology improves existing processes, products, services, designs, plants, etc. The DFSS project stages are summarized as Identify, Design, Optimize, and Validate (IDOV). Role of CM for DFSS and DMAIC will be discussed. Seven steps for Six Sigma introduction in new management strategy and the other seven steps for Six Sigma improvement implementation shall be discussed indicating possible role of CM. Tasks of Black Belt leader in Six Sigma implementation are very important. The expected outcomes of Six Sigma efforts are: Faster and more robust product development. More efficient and capable manufacturing processes and, more confident overall business performance. The investigation and knowledge of Six Sigma effects produced in metals industry on CM will increase the effectiveness of each other, and it will be a better, reliable and well documented approach towards Six Sigma. (author)

  1. Issues and Techniques of CASE Integration With Configuration Management

    Science.gov (United States)

    1992-03-01

    all four!) process architecture classes. For example, Frame Technology’s FrameMaker is a client/server tool because it provides server functions for... FrameMaker clients; it is a parent/child tool since a top-level control panel is used to "fork" child FrameMaker sessions; the "forked" FrameMaker ...sessions are persistent tools since they may be reused to create and modify any number of FrameMaker documents. Despite this, however, these process

  2. Use of computer-aided-engineering (CAE) for configuration management

    International Nuclear Information System (INIS)

    Bellon, M.

    1989-01-01

    For nearly 25 years, Electricite de France (EDF) has been designing and building nuclear power plants, and now has more than 50 in operation. During this period, EDF has faced problems common to all designers and operators. The author discusses two major aspects which must be dealt with to design a power plant: installation design and operational description. In both cases, the designer has to ensure that all parameters conform to the design requirements and that all documents are consistent with each other. For the operational description, the most important part of the job is to check and maintain consistency between the various documents: P and ID's, functional diagrams, cable networks, procedures, data management and also installation drawings. The author discusses how EDF has chosen two computer aided design softwares---PDMS and PHENIX---and has built a powerful engineering system around them

  3. National Waste Terminal Storage Program: configuration management plan. Volume II. Plan description

    International Nuclear Information System (INIS)

    1977-05-01

    Purpose of the Configuration Management Plan is to provide the management discipline through which the integrity and continuity of program cost and schedule trade-off decisions which are made concerning the site selections and facilities performance, producibility, operability and supportability are recorded, communicated, and controlled by the Office of Waste Isolation

  4. Tank monitor and control system (TMACS) software configuration management plan; TOPICAL

    International Nuclear Information System (INIS)

    GLASSCOCK, J.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) describes the methodology for control of computer software developed and supported by the Systems Development and Integration (SD and I) organization of Lockheed Martin Services, Inc. (LMSI) for the Tank Monitor and Control System (TMACS). This plan controls changes to the software and configuration files used by TMACS. The controlled software includes the Gensym software package, Gensym knowledge base files developed for TMACS, C-language programs used by TMACS, the operating system on the production machine, language compilers, and all Windows NT commands and functions which affect the operating environment. The configuration files controlled include the files downloaded to the Acromag and Westronic field instruments

  5. Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management. [for NASA Space Station Freedom Program

    Science.gov (United States)

    Gavert, Raymond B.

    1990-01-01

    Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

  6. Light Water Reactor Sustainability Program Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

    Energy Technology Data Exchange (ETDEWEB)

    Curtis Smith; James Knudsen; Bentley Harwood

    2013-08-01

    The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

  7. Use of configuration management to reduce development costs in metal parts

    International Nuclear Information System (INIS)

    Kalsoom, T.; Ahmad, S.

    2005-01-01

    In development and manufacturing phases of metal parts, design efforts are converted in set of engineering data pack under the given guidelines of Configuration Management (CM). These engineering documents define Configuration Management of metal parts production in a local industry. The development phase is normally less structured and open to Engineering Change Proposals. In our local engineering organizations most of the work done is normally not well documented for future revisions and modernization. This leads to delays in development and increase in production costs of metal parts. This becomes more pronounced if any member of the design team disassociates and leaves the organization. The Configuration Management helps to reduce development costs by providing infrastructure for product identification, documentation, change control, interface control and technical reviews and product audits. Automated or Computer-Assisted CM activities can also be used to shorten response time and increase accuracy and reliability of the produced metal components. (author)

  8. A method of demand-driven and data-centric Web service configuration for flexible business process implementation

    Science.gov (United States)

    Xu, Boyi; Xu, Li Da; Fei, Xiang; Jiang, Lihong; Cai, Hongming; Wang, Shuai

    2017-08-01

    Facing the rapidly changing business environments, implementation of flexible business process is crucial, but difficult especially in data-intensive application areas. This study aims to provide scalable and easily accessible information resources to leverage business process management. In this article, with a resource-oriented approach, enterprise data resources are represented as data-centric Web services, grouped on-demand of business requirement and configured dynamically to adapt to changing business processes. First, a configurable architecture CIRPA involving information resource pool is proposed to act as a scalable and dynamic platform to virtualise enterprise information resources as data-centric Web services. By exposing data-centric resources as REST services in larger granularities, tenant-isolated information resources could be accessed in business process execution. Second, dynamic information resource pool is designed to fulfil configurable and on-demand data accessing in business process execution. CIRPA also isolates transaction data from business process while supporting diverse business processes composition. Finally, a case study of using our method in logistics application shows that CIRPA provides an enhanced performance both in static service encapsulation and dynamic service execution in cloud computing environment.

  9. Relation between facial affect recognition and configural face processing in antipsychotic-free schizophrenia.

    Science.gov (United States)

    Fakra, Eric; Jouve, Elisabeth; Guillaume, Fabrice; Azorin, Jean-Michel; Blin, Olivier

    2015-03-01

    Deficit in facial affect recognition is a well-documented impairment in schizophrenia, closely connected to social outcome. This deficit could be related to psychopathology, but also to a broader dysfunction in processing facial information. In addition, patients with schizophrenia inadequately use configural information-a type of processing that relies on spatial relationships between facial features. To date, no study has specifically examined the link between symptoms and misuse of configural information in the deficit in facial affect recognition. Unmedicated schizophrenia patients (n = 30) and matched healthy controls (n = 30) performed a facial affect recognition task and a face inversion task, which tests aptitude to rely on configural information. In patients, regressions were carried out between facial affect recognition, symptom dimensions and inversion effect. Patients, compared with controls, showed a deficit in facial affect recognition and a lower inversion effect. Negative symptoms and lower inversion effect could account for 41.2% of the variance in facial affect recognition. This study confirms the presence of a deficit in facial affect recognition, and also of dysfunctional manipulation in configural information in antipsychotic-free patients. Negative symptoms and poor processing of configural information explained a substantial part of the deficient recognition of facial affect. We speculate that this deficit may be caused by several factors, among which independently stand psychopathology and failure in correctly manipulating configural information. PsycINFO Database Record (c) 2015 APA, all rights reserved.

  10. Random covering of the circle: the configuration-space of the free deposition process

    Energy Technology Data Exchange (ETDEWEB)

    Huillet, Thierry [Laboratoire de Physique Theorique et Modelisation, CNRS-UMR 8089 et Universite de Cergy-Pontoise, 5 mail Gay-Lussac, 95031, Neuville sur Oise (France)

    2003-12-12

    Consider a circle of circumference 1. Throw at random n points, sequentially, on this circle and append clockwise an arc (or rod) of length s to each such point. The resulting random set (the free gas of rods) is a collection of a random number of clusters with random sizes. It models a free deposition process on a 1D substrate. For such processes, we shall consider the occurrence times (number of rods) and probabilities, as n grows, of the following configurations: those avoiding rod overlap (the hard-rod gas), those for which the largest gap is smaller than rod length s (the packing gas), those (parking configurations) for which hard rod and packing constraints are both fulfilled and covering configurations. Special attention is paid to the statistical properties of each such (rare) configuration in the asymptotic density domain when ns = {rho}, for some finite density {rho} of points. Using results from spacings in the random division of the circle, explicit large deviation rate functions can be computed in each case from state equations. Lastly, a process consisting in selecting at random one of these specific equilibrium configurations (called the observable) can be modelled. When particularized to the parking model, this system produces parking configurations differently from Renyi's random sequential adsorption model.

  11. Processes for managing pathogens.

    Science.gov (United States)

    Godfree, Alan; Farrell, Joseph

    2005-01-01

    Wastewater contains human, animal, and plant pathogens capable of causing viral, bacterial, or parasitic infections. There are several routes whereby sewage pathogens may affect human health, including direct contact, contamination of food crops, zoonoses, and vectors. The range and numbers of pathogens in municipal wastewater vary with the level of endemic disease in the community, discharges from commercial activities, and seasonal factors. Regulations to control pathogen risk in the United States and Europe arising from land application of biosolids are based on the concept of multiple barriers to the prevention of transmission. The barriers are (i) treatment to reduce pathogen content and vector attraction, (ii) restrictions on crops grown on land to which biosolids have been applied, and (iii) minimum intervals following application and grazing or harvesting. Wastewater treatment reduces number of pathogens in the wastewater by concentrating them with the solids in the sludge. Although some treatment processes are designed specifically to inactivate pathogens, many are not, and the actual mechanisms of microbial inactivation are not fully understood for all processes. Vector attraction is reduced by stabilization (reduction of readily biodegradable material) and/or incorporation immediately following application. Concerns about health risks have renewed interest in the effects of treatment (on pathogens) and advanced treatment methods, and work performed in the United States suggests that Class A pathogen reduction can be achieved less expensively than previously thought. Effective pathogen risk management requires control to the complete chain of sludge treatment, biosolids handling and application, and post-application activities. This may be achieved by adherence to quality management systems based on hazard analysis critical control point (HACCP) principles.

  12. A linear program for optimal configurable business processes deployment into cloud federation

    NARCIS (Netherlands)

    Rekik, M.; Boukadi, K.; Assy, N.; Gaaloul, W.; Ben-Abdallah, H.; Zhang, J.; Miller, J.A.; Xu, X.

    2016-01-01

    A configurable process model is a generic model from which an enterprise can derive and execute process variants that meet its specific needs and contexts. With the advent of cloud computing and its economic pay-per-use model, enterprises are increasingly outsourcing partially or totally their

  13. An advanced configuration management system for full scope power plant simulators

    International Nuclear Information System (INIS)

    Storm, J.; Goemann, A.

    1996-01-01

    In August 1993 KSG Kraftwerks-Simulator-Gesellschaft, Germany, awarded a contract to STN ATLAS Elektronik for the delivery of two full scope replica training simulators for the German BWR plants Isar 1 and Philipsburg 1, known as the double simulator project S30 (S31/S32). For both projects a computer based Configuration Management System (CMS) was required to overcome deficiencies of older simulator systems in terms of limited upgrade and maintenance capabilities and incomplete documentation. The CMS allows complete control over the entire simulator system covering all software- and hardware-items and therewith exceed quality assurance requirements as defined in ISO 9000-3 which gives recommendations for software configuration management only. The system is realized under the project using the UNIX based relational database system EMPRESS and is in use as a development- and maintenance-tool to improve simulator quality and ensure simulator configuration integrity

  14. Implementation of a design and configuration management platform for fusion components on the Tore Supra WEST Project

    Energy Technology Data Exchange (ETDEWEB)

    Benoît, Fabrice, E-mail: fabrice-2.benoit@cea.fr [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Allegretti, Ludovic [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Aumeunier, Marie-Hélène [OPTIS, ZE de La Farlède, F-83078 Toulon Cedex 9 (France); Bucalossi, Jérôme; Doceul, Louis; Faïsse, Frederic; Firdaouss, Medhi; Geynet, Michel; Houtte, Didier van; Larroque, Sébastien; Magaud, Philippe; Maini, Patrick; Missirlian, Marc; Parrat, Hélène [CEA, IRFM, F-13108 Saint-Paul-lez-Durance (France); Robert, Julien [SOFYNE, F-69800 Saint Priest (France)

    2014-10-15

    Highlights: •A design and configuration management platform is under development for managing fusion components lifecycle at CEA. •Design platform ensures an efficient sharing of the data and provides connections between the different software and databases involved in fusion components design. •Design platform rollout on WEST project is ongoing as part of change control and configuration management implementation. -- Abstract: This paper presents the technical solutions and methodologies that are used and under development for managing the design lifecycle of the WEST project (W – for tungsten – Environment in Steady-state Tokamak, upgrade of Tore Supra's with actively cooled tungsten plasma facing components) fusion components and explains the interfaces that are implemented or in construction to connect together the different tools like documents management system, CAD modeler, or simulation codes around the data management backbone. It describes the methodologies used on the WEST project to optimize the design process by managing the engineering data workflow and ensuring the consistency between the different 3D representations for design or analysis as well as the specification or interfaces documents. Finally it explains how this platform contributes to reach the project targets in terms of performance, cost and schedule.

  15. Implementation of a design and configuration management platform for fusion components on the Tore Supra WEST Project

    International Nuclear Information System (INIS)

    Benoît, Fabrice; Allegretti, Ludovic; Aumeunier, Marie-Hélène; Bucalossi, Jérôme; Doceul, Louis; Faïsse, Frederic; Firdaouss, Medhi; Geynet, Michel; Houtte, Didier van; Larroque, Sébastien; Magaud, Philippe; Maini, Patrick; Missirlian, Marc; Parrat, Hélène; Robert, Julien

    2014-01-01

    Highlights: •A design and configuration management platform is under development for managing fusion components lifecycle at CEA. •Design platform ensures an efficient sharing of the data and provides connections between the different software and databases involved in fusion components design. •Design platform rollout on WEST project is ongoing as part of change control and configuration management implementation. -- Abstract: This paper presents the technical solutions and methodologies that are used and under development for managing the design lifecycle of the WEST project (W – for tungsten – Environment in Steady-state Tokamak, upgrade of Tore Supra's with actively cooled tungsten plasma facing components) fusion components and explains the interfaces that are implemented or in construction to connect together the different tools like documents management system, CAD modeler, or simulation codes around the data management backbone. It describes the methodologies used on the WEST project to optimize the design process by managing the engineering data workflow and ensuring the consistency between the different 3D representations for design or analysis as well as the specification or interfaces documents. Finally it explains how this platform contributes to reach the project targets in terms of performance, cost and schedule

  16. A Common Software Configuration Management System for CERN SPS and LEP Accelerators and Technical Services

    CERN Document Server

    Hatziangeli, Eugenia; Bragg, A E; Ninin, P; Patino, J; Sobczak, H

    1999-01-01

    Software configuration management activities are crucial to assure the integrity of current operational and the quality of new software either being developed at CERN or outsourced. The functionality of the present management system became insufficient with large maintenance overheads. In order to improve our situation, a new software configuration management system has been set up. It is based on Razor, a commercial tool, which supports the management of file versions and operational software releases, along with integrated problem reporting capabilities. In addition to the basic tool functionality, automated procedures were custom made, for the installation and distribution of operational software. Policies were developed and applied over the software development life cycle to provide visibility and control. The system ensures that, at all times, the status and location of all deliverable versions are known, the state of shared objects is carefully controlled and unauthorised changes prevented. It provides ...

  17. A Common Software-Configuration Management System for CERN SPS and LEP Accelerators and Technical Services

    CERN Document Server

    Hatziangeli, Eugenia; Bragg, A E; Ninin, P; Patino, J; Sobczak, H

    2000-01-01

    Software-configuration management activities are crucial to ensure the integrity of current operational software and the quality of new software either being developed at CERN or outsourced. The functionality of the present management system became insufficient with large maintenance overheads. In order to improve our situation, a new software-configuration management system has been set up. It is based on Razor R, a commercial tool, which supports the management of file versions and operational software releases, along with integrated problem-reporting capabilities. In addition to the basic tool functionality, automated procedures were custom-made for the installation and distribution of operational software. The system ensures that, at all times, the status and location of all deliverable versions are known, the state of shared objects is carefully controlled and unauthorized changes prevented. This paper outlines the reasons for selecting the chosen tool, the implementation of the system and the final goal...

  18. A novel configurable VLSI architecture design of window-based image processing method

    Science.gov (United States)

    Zhao, Hui; Sang, Hongshi; Shen, Xubang

    2018-03-01

    Most window-based image processing architecture can only achieve a certain kind of specific algorithms, such as 2D convolution, and therefore lack the flexibility and breadth of application. In addition, improper handling of the image boundary can cause loss of accuracy, or consume more logic resources. For the above problems, this paper proposes a new VLSI architecture of window-based image processing operations, which is configurable and based on consideration of the image boundary. An efficient technique is explored to manage the image borders by overlapping and flushing phases at the end of row and the end of frame, which does not produce new delay and reduce the overhead in real-time applications. Maximize the reuse of the on-chip memory data, in order to reduce the hardware complexity and external bandwidth requirements. To perform different scalar function and reduction function operations in pipeline, this can support a variety of applications of window-based image processing. Compared with the performance of other reported structures, the performance of the new structure has some similarities to some of the structures, but also superior to some other structures. Especially when compared with a systolic array processor CWP, this structure at the same frequency of approximately 12.9% of the speed increases. The proposed parallel VLSI architecture was implemented with SIMC 0.18-μm CMOS technology, and the maximum clock frequency, power consumption, and area are 125Mhz, 57mW, 104.8K Gates, respectively, furthermore the processing time is independent of the different window-based algorithms mapped to the structure

  19. Management of processes of electrochemical dimensional processing

    Science.gov (United States)

    Akhmetov, I. D.; Zakirova, A. R.; Sadykov, Z. B.

    2017-09-01

    In different industries a lot high-precision parts are produced from hard-processed scarce materials. Forming such details can only be acting during non-contact processing, or a minimum of effort, and doable by the use, for example, of electro-chemical processing. At the present stage of development of metal working processes are important management issues electrochemical machining and its automation. This article provides some indicators and factors of electrochemical machining process.

  20. Air Quality Management Process Cycle

    Science.gov (United States)

    Air quality management are activities a regulatory authority undertakes to protect human health and the environment from the harmful effects of air pollution. The process of managing air quality can be illustrated as a cycle of inter-related elements.

  1. Computational environment and software configuration management of the 1996 performance assessment for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Froehlich, Gary K.; Williamson, Charles Michael; Ogden, Harvey C.

    2000-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP), located in southeast New Mexico, is a deep geologic repository for the permanent disposal of transuranic waste generated by DOE defense-related activities. Sandia National Laboratories (SNL), in its role as scientific advisor to the DOE, is responsible for evaluating the long-term performance of the WIPP. This risk-based Performance Assessment (PA) is accomplished in part through the use of numerous scientific modeling codes, which rely for some of their inputs on data gathered during characterization of the site. The PA is subject to formal requirements set forth in federal regulations. In particular, the components of the calculation fall under the configuration management and software quality assurance aegis of the American Society of Mechanical Engineers (ASME) Nuclear Quality Assurance (NQA) requirements. This paper describes SNL's implementation of the NQA requirements regarding configuration management. The complexity of the PA calculation is described, and the rationale for developing a flexible, robust run-control process is discussed. The run-control implementation is described, and its integration with the configuration-management system is then explained, to show how a calculation requiring 37,000 CPU-hours, and involving 225,000 output files totaling 95 Gigabytes, was accomplished in 5 months by 2 individuals, with full traceability and reproducibility

  2. Computational environment and software configuration management of the 1996 performance assessment for the Waste Isolation Pilot Plant

    International Nuclear Information System (INIS)

    Froehlich, G.K.; Williamson, C.M.; Ogden, H.C.

    2000-01-01

    The US Department of Energy (DOE) Waste Isolation Pilot Plant (WIPP), located in southeast New Mexico, is a deep geologic repository for the permanent disposal of transuranic waste generated by DOE defense-related activities. Sandia National Laboratories (SNL), in its role as scientific advisor to the DOE, is responsible for evaluating the long-term performance of the WIPP. This risk-based Performance Assessment (PA) is accomplished in part through the use of numerous scientific modeling codes, which rely for some of their inputs on data gathered during characterization of the site. The PA is subject to formal requirements set forth in federal regulations. In particular, the components of the calculation fall under the configuration management and software quality assurance aegis of the American Society of Mechanical Engineers (ASME) Nuclear Quality Assurance (NQA) requirements. This paper describes SNL's implementation of the NQA requirements regarding configuration management. The complexity of the PA calculation is described, and the rationale for developing a flexible, robust run-control process is discussed. The run-control implementation is described, and its integration with the configuration-management system is then explained, to show how a calculation requiring 37,000 CPU-hours, and involving 225,000 output files totaling 95 GB, was accomplished in 5 months by two individuals, with full traceability and reproducibility

  3. A novel BCI based on ERP components sensitive to configural processing of human faces

    Science.gov (United States)

    Zhang, Yu; Zhao, Qibin; Jing, Jin; Wang, Xingyu; Cichocki, Andrzej

    2012-04-01

    This study introduces a novel brain-computer interface (BCI) based on an oddball paradigm using stimuli of facial images with loss of configural face information (e.g., inversion of face). To the best of our knowledge, till now the configural processing of human faces has not been applied to BCI but widely studied in cognitive neuroscience research. Our experiments confirm that the face-sensitive event-related potential (ERP) components N170 and vertex positive potential (VPP) have reflected early structural encoding of faces and can be modulated by the configural processing of faces. With the proposed novel paradigm, we investigate the effects of ERP components N170, VPP and P300 on target detection for BCI. An eight-class BCI platform is developed to analyze ERPs and evaluate the target detection performance using linear discriminant analysis without complicated feature extraction processing. The online classification accuracy of 88.7% and information transfer rate of 38.7 bits min-1 using stimuli of inverted faces with only single trial suggest that the proposed paradigm based on the configural processing of faces is very promising for visual stimuli-driven BCI applications.

  4. A Configurable Surface-Electrode Ion Trap Design for Quantum Information Processing

    International Nuclear Information System (INIS)

    Liu Wei; Chen Shu-Ming; Chen Ping-Xing; Wu Wei

    2013-01-01

    We propose a configurable surface-electrode ion trap design to alleviate the poor reusability of the existing traps. It can architecturally and electrically support 5 mainstream modes by design reuse, thus enhancing the trap reusability and reducing the experiment setup overhead. We also develop a corresponding simulation suite which can optimize trap geometries and calculate trap parameters to control the trapped ion's classic motion. According to our analytical and simulated results, the configurable design can serve as a unified platform for basic research of large-scale quantum information processing

  5. MANAGING TRANSITION PROCESSES OF MANUFACTURING CONFIGURATIONS OF GLOBAL OPERATIONS

    DEFF Research Database (Denmark)

    Adeyemi, Oluseyi

    2012-01-01

    was reduced as a result of the possibility to exploit the opportunity of low cost of production and to harness cheap resources related benefits by offshoring activities. As a result of offshoring and outsourcing, manufacturing activities kept in-house in western companies have reduced and has led......Exploration and exploitation excellence is one of the ways of satisfying today’s, tomorrow’s and future customers. Bolwijn and Kumpe (1998) explained that efficiency, quality, flexibility, speed and innovativeness are necessary in order to achieve exploration and exploitation excellence. Western...... companies have now started to compete on the basis of value delivered by shifting their market focus from manufacturing to more product-service oriented systems. This is linked to the view that manufacturing companies are becoming more oriented to the use of the product-service offering rather than the pure...

  6. Configuration and specifications of an Unmanned Aerial Vehicle (UAV) for early site specific weed management.

    Science.gov (United States)

    Torres-Sánchez, Jorge; López-Granados, Francisca; De Castro, Ana Isabel; Peña-Barragán, José Manuel

    2013-01-01

    A new aerial platform has risen recently for image acquisition, the Unmanned Aerial Vehicle (UAV). This article describes the technical specifications and configuration of a UAV used to capture remote images for early season site- specific weed management (ESSWM). Image spatial and spectral properties required for weed seedling discrimination were also evaluated. Two different sensors, a still visible camera and a six-band multispectral camera, and three flight altitudes (30, 60 and 100 m) were tested over a naturally infested sunflower field. The main phases of the UAV workflow were the following: 1) mission planning, 2) UAV flight and image acquisition, and 3) image pre-processing. Three different aspects were needed to plan the route: flight area, camera specifications and UAV tasks. The pre-processing phase included the correct alignment of the six bands of the multispectral imagery and the orthorectification and mosaicking of the individual images captured in each flight. The image pixel size, area covered by each image and flight timing were very sensitive to flight altitude. At a lower altitude, the UAV captured images of finer spatial resolution, although the number of images needed to cover the whole field may be a limiting factor due to the energy required for a greater flight length and computational requirements for the further mosaicking process. Spectral differences between weeds, crop and bare soil were significant in the vegetation indices studied (Excess Green Index, Normalised Green-Red Difference Index and Normalised Difference Vegetation Index), mainly at a 30 m altitude. However, greater spectral separability was obtained between vegetation and bare soil with the index NDVI. These results suggest that an agreement among spectral and spatial resolutions is needed to optimise the flight mission according to every agronomical objective as affected by the size of the smaller object to be discriminated (weed plants or weed patches).

  7. Configuration and specifications of an Unmanned Aerial Vehicle (UAV for early site specific weed management.

    Directory of Open Access Journals (Sweden)

    Jorge Torres-Sánchez

    Full Text Available A new aerial platform has risen recently for image acquisition, the Unmanned Aerial Vehicle (UAV. This article describes the technical specifications and configuration of a UAV used to capture remote images for early season site- specific weed management (ESSWM. Image spatial and spectral properties required for weed seedling discrimination were also evaluated. Two different sensors, a still visible camera and a six-band multispectral camera, and three flight altitudes (30, 60 and 100 m were tested over a naturally infested sunflower field. The main phases of the UAV workflow were the following: 1 mission planning, 2 UAV flight and image acquisition, and 3 image pre-processing. Three different aspects were needed to plan the route: flight area, camera specifications and UAV tasks. The pre-processing phase included the correct alignment of the six bands of the multispectral imagery and the orthorectification and mosaicking of the individual images captured in each flight. The image pixel size, area covered by each image and flight timing were very sensitive to flight altitude. At a lower altitude, the UAV captured images of finer spatial resolution, although the number of images needed to cover the whole field may be a limiting factor due to the energy required for a greater flight length and computational requirements for the further mosaicking process. Spectral differences between weeds, crop and bare soil were significant in the vegetation indices studied (Excess Green Index, Normalised Green-Red Difference Index and Normalised Difference Vegetation Index, mainly at a 30 m altitude. However, greater spectral separability was obtained between vegetation and bare soil with the index NDVI. These results suggest that an agreement among spectral and spatial resolutions is needed to optimise the flight mission according to every agronomical objective as affected by the size of the smaller object to be discriminated (weed plants or weed patches.

  8. Waste Management Process Improvement Project

    International Nuclear Information System (INIS)

    Atwood, J.; Borden, G.; Rangel, G. R.

    2002-01-01

    The Bechtel Hanford-led Environmental Restoration Contractor team's Waste Management Process Improvement Project is working diligently with the U.S. Department of Energy's (DOE) Richland Operations Office to improve the waste management process to meet DOE's need for an efficient, cost-effective program for the management of dangerous, low-level and mixed-low-level waste. Additionally the program must meet all applicable regulatory requirements. The need for improvement was highlighted when a change in the Groundwater/Vadose Zone Integration Project's waste management practices resulted in a larger amount of waste being generated than the waste management organization had been set up to handle

  9. Comprehensive Environmental Management Process

    International Nuclear Information System (INIS)

    Hjeresen, D.L.; Roybal, S.L.

    1994-01-01

    This report contains information about Los Alamos National Laboratory's Comprehensive Environmental Management Plan. The topics covered include: waste minimization, waste generation, environmental concerns, public relations of the laboratory, and how this plan will help to answer to the demands of the laboratory as their mission changes

  10. Tolerance for distorted faces: challenges to a configural processing account of familiar face recognition.

    Science.gov (United States)

    Sandford, Adam; Burton, A Mike

    2014-09-01

    Face recognition is widely held to rely on 'configural processing', an analysis of spatial relations between facial features. We present three experiments in which viewers were shown distorted faces, and asked to resize these to their correct shape. Based on configural theories appealing to metric distances between features, we reason that this should be an easier task for familiar than unfamiliar faces (whose subtle arrangements of features are unknown). In fact, participants were inaccurate at this task, making between 8% and 13% errors across experiments. Importantly, we observed no advantage for familiar faces: in one experiment participants were more accurate with unfamiliars, and in two experiments there was no difference. These findings were not due to general task difficulty - participants were able to resize blocks of colour to target shapes (squares) more accurately. We also found an advantage of familiarity for resizing other stimuli (brand logos). If configural processing does underlie face recognition, these results place constraints on the definition of 'configural'. Alternatively, familiar face recognition might rely on more complex criteria - based on tolerance to within-person variation rather than highly specific measurement. Copyright © 2014 Elsevier B.V. All rights reserved.

  11. Impaired configural body processing in anorexia nervosa: evidence from the body inversion effect.

    Science.gov (United States)

    Urgesi, Cosimo; Fornasari, Livia; Canalaz, Francesca; Perini, Laura; Cremaschi, Silvana; Faleschini, Laura; Thyrion, Erica Zappoli; Zuliani, Martina; Balestrieri, Matteo; Fabbro, Franco; Brambilla, Paolo

    2014-11-01

    Patients with anorexia nervosa (AN) suffer from severe disturbances of body perception. It is unclear, however, whether such disturbances are linked to specific alterations in the processing of body configurations with respect to the local processing of body part details. Here, we compared a consecutive sample of 12 AN patients with a group of 12 age-, gender- and education-matched controls using an inversion effect paradigm requiring the visual discrimination of upright and inverted pictures of whole bodies, faces and objects. The AN patients presented selective deficits in the discrimination of upright body stimuli, which requires configural processing. Conversely, patients and controls showed comparable abilities in the discrimination of inverted bodies, which involves only detail-based processing, and in the discrimination of both upright and inverted faces and objects. Importantly, the body inversion effect negatively correlated with the persistence scores at the Temperament and Character Inventory, which evaluates increased tendency to convert a signal of punishment into a signal of reinforcement. These results suggest that the deficits of configural processing in AN patients may be associated with their obsessive worries about body appearance and to the excessive attention to details that characterizes their general perceptual style. © 2013 The British Psychological Society.

  12. Configuration management plan. System definition and project development. Repository Based Software Engineering (RBSE) program

    Science.gov (United States)

    Mckay, Charles

    1991-01-01

    This is the configuration management Plan for the AdaNet Repository Based Software Engineering (RBSE) contract. This document establishes the requirements and activities needed to ensure that the products developed for the AdaNet RBSE contract are accurately identified, that proposed changes to the product are systematically evaluated and controlled, that the status of all change activity is known at all times, and that the product achieves its functional performance requirements and is accurately documented.

  13. Development of an integrated configuration management/flight director system for piloted STOL approaches

    Science.gov (United States)

    Hoh, R. H.; Klein, R. H.; Johnson, W. A.

    1977-01-01

    A system analysis method for the development of an integrated configuration management/flight director system for IFR STOL approaches is presented. Curved descending decelerating approach trajectories are considered. Considerable emphasis is placed on satisfying the pilot centered requirements (acceptable workload) as well as the usual guidance and control requirements (acceptable performance). The Augmentor Wing Jet STOL Research Aircraft was utilized to allow illustration by example, and to validate the analysis procedure via manned simulation.

  14. Design of a flight director/configuration management system for piloted STOL approaches

    Science.gov (United States)

    Hoh, R. H.; Klein, R. H.; Johnson, W. A.

    1973-01-01

    The design and characteristics of a flight director for V/STOL aircraft are discussed. A configuration management system for piloted STOL approaches is described. The individual components of the overall system designed to reduce pilot workload to an acceptable level during curved, decelerating, and descending STOL approaches are defined. The application of the system to augmentor wing aircraft is analyzed. System performance checks and piloted evaluations were conducted on a flight simulator and the results are summarized.

  15. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    Science.gov (United States)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  16. Issues Management Process Course # 38401

    Energy Technology Data Exchange (ETDEWEB)

    Binion, Ula Marie [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2018-02-01

    The purpose of this training it to advise Issues Management Coordinators (IMCs) on the revised Contractor Assurance System (CAS) Issues Management (IM) process. Terminal Objectives: Understand the Laboratory’s IM process; Understand your role in the Laboratory’s IM process. Learning Objectives: Describe the IM process within the context of the CAS; Describe the importance of implementing an institutional IM process at LANL; Describe the process flow for the Laboratory’s IM process; Apply the definition of an issue; Use available resources to determine initial screening risk levels for issues; Describe the required major process steps for each risk level; Describe the personnel responsibilities for IM process implementation; Access available resources to support IM process implementation.

  17. The effect of texture on face identification and configural information processing

    Directory of Open Access Journals (Sweden)

    Tzschaschel Eva Alica

    2014-01-01

    Full Text Available Shape and texture are an integral part of face identity. In the present study, the importance of face texture for face identification and detection of configural manipulation (i.e., spatial relation among facial features was examined by comparing grayscale face photographs (i.e., real faces and line drawings of the same faces. Whereas real faces provide information about texture and shape of faces, line drawings are lacking texture cues. A change-detection task and a forced-choice identification task were used with both stimuli categories. Within the change detection task, participants had to decide whether the size of the eyes of two sequentially presented faces had changed or not. After having made this decision, three faces were shown to the subjects and they had to identify the previously shown face among them. Furthermore, context (full vs. cropped faces and orientation (upright vs. inverted were manipulated. The results obtained in the change detection task suggest that configural information was used in processing real faces, while part-based and featural information was used in processing line-drawings. Additionally, real faces were identified more accurately than line drawings, and identification was less context but more orientation sensitive than identification of line drawings. Taken together, the results of the present study provide new evidence stressing the importance of face texture for identity encoding and configural face processing.

  18. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    International Nuclear Information System (INIS)

    Dobson, D.; Churby, A.; Krieger, E.; Maloy, D.; White, K.

    2011-01-01

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance and Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  19. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    Energy Technology Data Exchange (ETDEWEB)

    Dobson, D; Churby, A; Krieger, E; Maloy, D; White, K

    2011-07-25

    The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of the shot experiment data and the safe operation of the facility. The NIF business application suite of software provides the means to effectively manage the definition, build, operation, maintenance and configuration control of all components of the National Ignition Facility. State of the art Computer Aided Design software applications are used to generate a virtual model and assemblies. Engineering bills of material are controlled through the Enterprise Configuration Management System. This data structure is passed to the Enterprise Resource Planning system to create a manufacturing bill of material. Specific parts are serialized then tracked along their entire lifecycle providing visibility to the location and status of optical, target and diagnostic components that are key to assessing pre-shot machine readiness. Nearly forty thousand items requiring preventive, reactive and calibration maintenance are tracked through the System Maintenance & Reliability Tracking application to ensure proper operation. Radiological tracking applications ensure proper stewardship of radiological and hazardous materials and help provide a safe working environment for NIF personnel.

  20. The impact of configural superiority on the processing of spatial information.

    Science.gov (United States)

    Bratch, Alexander; Barr, Shawn; Bromfield, W Drew; Srinath, Aparna; Zhang, Jack; Gold, Jason M

    2016-09-01

    The impact of context on perception has been well documented for over a century. In some cases, the introduction of context to a set of target features may produce a unified percept, leading to a quicker and more accurate classification; a configural superiority effect (Pomerantz, Sager, & Stoever, 1977). Although this effect has been well characterized in terms of the stimulus features that produce the effect, the specific impact context has on the spatial strategies adopted by observers when making perceptual judgments remains unclear. Here, we sought to address this question by using the methods of response classification and ideal observer analysis. In our main experiment, we used a stimulus set known to produce the configural superiority effect and found that although observers were faster in the presence of context, they were actually less efficient at extracting stimulus information. This surprising result was attributable to the use of a spatial strategy in which observers relied on redundant, noninformative features in the presence of context. A control experiment ruled out the possibility that the mere presence of added context led to these strategic shifts. Our results support previous notions about the nature of the perceptual shifts that are induced by the configural superiority effect. However, they also show that configural processing is more nuanced than originally thought: Although observers may be faster at making judgments when context induces the percept of a configural whole, there appears to be a hidden cost in terms of the efficiency with which information is used. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  1. Configuration management plan for waste tank farms and the 242-A evaporator of tank waste remediation system

    International Nuclear Information System (INIS)

    Laney, T.

    1994-01-01

    The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ''Guide for Operational Configuration Management Program.'' The DOE Standard defines the configuration management program by the five basic program elements of ''program management,'' ''design requirements,'' ''document control,'' ''change control,'' and ''assessments,'' and the two adjunct recovery programs of ''design reconstitution,'' and ''material condition and aging management.'' The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System

  2. A novel design of reactive distillation configuration for 2-methoxy-2-methylheptane process

    Directory of Open Access Journals (Sweden)

    Hussain Arif

    2017-01-01

    Full Text Available The study aims to reveal the possibility of reactive distillation (RD in the 2-methoxy-2-methylheptane (MMH production process. MMH is getting more industrial and academic interests as a gasoline additive to replace methyl tert-butyl ether. Traditionally, MMH is obtained by carrying out the reaction in the reactor followed by three distillation columns. The high yield of MMH could be achieved by keeping the large reactor size or by using the large excess of 2-methyl-1-heptene (MH. Both former and latter strategies are associated with the high capital and operating costs. To solve these problems, this study proposed an innovative RD configuration to take synergistic benefits of reaction and separation involved. This innovative RD configuration allows the production of MMH with significantly lower capital, operating and total annual costs. For desired MMH yield, the result demonstrates that the proposed RD configuration can reduce energy, capital, and total annual costs up to 7.7, 31.3, and 17.1%, respectively, compared to a conventional process. Furthermore, the influence of some important design parameters on the RD column performance was also explored to overcome the temperature limitation of acid resin catalyst inside the reactive zone of the RD column.

  3. Detailed requirements document for Stowage List and Hardware Tracking System (SLAHTS). [computer based information management system in support of space shuttle orbiter stowage configuration

    Science.gov (United States)

    Keltner, D. J.

    1975-01-01

    The stowage list and hardware tracking system, a computer based information management system, used in support of the space shuttle orbiter stowage configuration and the Johnson Space Center hardware tracking is described. The input, processing, and output requirements that serve as a baseline for system development are defined.

  4. Congestion Management System Process Report

    Science.gov (United States)

    1996-03-01

    In January 1995, the Indianapolis Metropolitan Planning Organization with the help of an interagency Study Review Committee began the process of developing a Congestion Management System (CMS) Plan resulting in this report. This report documents the ...

  5. Configuration Management Program Application at KNPP Units 5 and 6 Modernization Program

    International Nuclear Information System (INIS)

    Manchev, B.; Yordanova, V.; Nenkova, B.

    2006-01-01

    The need for Configuration Management Program development, became very clear after the initiation of the Modernization Program for Units 5and6, because KNPP personnel needed a good and safe way to control the huge amount of data which were transferred into two directions - input data (design and operational documents from KNPP to Contractors) and the design, vendor, procurement, etc. documents (from Contractors to KNPP). Moreover, most of the measures are in fact design changes and it appeared to be extremely important to track these design changes and their reflection into design and operational documents. It is even more important to obtain a successful transfer of all this information to the operating organization (EP-2) after the completion. The proposal for development of Configuration Management (CM) Program for KNPP Units 5and6 Modernization program was divided into three phases: 1. Information Control (Document Control and Records Management) 2.Technical Decision System (Change Control) 3. Master Equipment List (MEL), (as part of the Design requirements element) Information Control Element was chosen to be developed first. Implementation of Information Control element comprised of: Review and assessment of existing situation (procedures for document control and records Management), Development of new/revision of existing procedure for Document Control and Records Management, Development of SmartDoc software application in support of document control and records management and for measure documentation tracking (with its specifics), Data entry for MP5and6 measures, Implementation at EP-2 (with successful data migration from the existing databases). The SmartDoc development was completed at the end of 2002 and after a testing period it was implemented at Modernization and Investment Department first. Then the data for documents were transferred from the existing databases at EP-2 and the system was implemented at EP-2 and other KNPP facilities. Development

  6. Nanoscale multireference quantum chemistry: full configuration interaction on graphical processing units.

    Science.gov (United States)

    Fales, B Scott; Levine, Benjamin G

    2015-10-13

    Methods based on a full configuration interaction (FCI) expansion in an active space of orbitals are widely used for modeling chemical phenomena such as bond breaking, multiply excited states, and conical intersections in small-to-medium-sized molecules, but these phenomena occur in systems of all sizes. To scale such calculations up to the nanoscale, we have developed an implementation of FCI in which electron repulsion integral transformation and several of the more expensive steps in σ vector formation are performed on graphical processing unit (GPU) hardware. When applied to a 1.7 × 1.4 × 1.4 nm silicon nanoparticle (Si72H64) described with the polarized, all-electron 6-31G** basis set, our implementation can solve for the ground state of the 16-active-electron/16-active-orbital CASCI Hamiltonian (more than 100,000,000 configurations) in 39 min on a single NVidia K40 GPU.

  7. Essential 'ways-of-working' features of 'configuration management for new-build 2011' and 'issue-resolved replication'

    International Nuclear Information System (INIS)

    Schneider, B.

    2011-01-01

    The 'Ways-of-Working Foundation' of the Competencies most vital to 'New-Build' are provided. Examples are provided of local CM disasters and I-R.R success stories from else-where. [Configuration Management for New-Build 2011 - State-of-Art Specifications at Every Level - driven by Best-Available OpEx - based on SofA Expertise - subjected to Transparent, Independent Review]. It is the position of CMC2011 that weak CM is at the root of much 'less-than-adequate performance' (especially refurb programs - since ∼1986). For New-Build, the 'Foundation' of Configuration-Management is 'State-of-Art Specifications for All Systems, Equipment, Materials, and Processes' - supported by 'State-of-Art Service-Provider Expertise' - and Audit-able via 'Transparent, Third-Party, Issue-Review-and-Resolution Programs'. CM must be executed by the Architecture-Service-Providers - but it must be demanded by the Utility-Owners. [Issue-Resolved, Configuration-Managed, Replication - Rigorous, Configuration-Managed Replication for the Capture of the 85% that is Proven - plus - Parallel, Transparent, Separately-Managed, Contractually-Facilitated, Side-Stream Programs for the Identification and Resolution of the highly-troublesome 15% that remains Un-Resolved]. For New-Build in 2011, as well as for Refurb and Ops/Outage Support at any time, the last thing the Owner-Utilities want is innovation - or invention - or anything else for which substantial operating-experience and reliability-verification cannot be provided. I-R.R is discussed as - i) 'Rigorous Replication' and ii) 'Issue-Identification and Resolution'. What we refer to as 'Side-Stream, Independently-Driven, Issue-Identification and Resolution' is already practiced by utility 'SIR Teams' - i.e. - 'go-anywhere, do-anything, flying-squads' - for whom the watch-word is 'expect the un-anticipated'. Issue-Resolution must be provided as part of every project. It must be demanded (and contractually-facilitated) up-front by the Utility

  8. Heat flux management via advanced magnetic divertor configurations and divertor detachment

    Energy Technology Data Exchange (ETDEWEB)

    Kolemen, E., E-mail: ekolemen@princeton.edu [Princeton University, Princeton, NJ 08544 (United States); Allen, S.L. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Bray, B.D. [General Atomics, PO Box 85608, San Diego, CA 92186-5608 (United States); Fenstermacher, M.E. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Humphreys, D.A.; Hyatt, A.W. [General Atomics, PO Box 85608, San Diego, CA 92186-5608 (United States); Lasnier, C.J. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Leonard, A.W. [General Atomics, PO Box 85608, San Diego, CA 92186-5608 (United States); Makowski, M.A.; McLean, A.G. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Maingi, R.; Nazikian, R. [Princeton Plasma Physics Laboratory, Princeton, NJ 08543 (United States); Petrie, T.W. [General Atomics, PO Box 85608, San Diego, CA 92186-5608 (United States); Soukhanovskii, V.A. [Lawrence Livermore National Laboratory, Livermore, CA 94550 (United States); Unterberg, E.A. [Oak Ridge National Laboratory, PO Box 2008, Oak Ridge, TN 37831 (United States)

    2015-08-15

    The snowflake divertor (SFD) control and detachment control to manage the heat flux at the divertor are successfully demonstrated at DIII-D. Results of the development and implementation of these two heat flux reduction control methods are presented. The SFD control algorithm calculates the position of the two null-points in real-time and controls shaping coil currents to achieve and stabilize various snowflake configurations. Detachment control stabilizes the detachment front fixed at specified distance between the strike point and the X-point throughout the shot.

  9. Software solutions manage the definition, operation, maintenance and configuration control of the National Ignition Facility

    International Nuclear Information System (INIS)

    Dobson, Darwin; Churby, Al; Krieger, Ed; Maloy, Donna; White, Kevin

    2012-01-01

    Highlights: ► NIF is a complex experimental facility composed of ∼4 million components. ► We describe business tools to define, build, operate, and maintain all components. ► CAD tools generate virtual models and assemblies under configuration control. ► Items requiring preventive, reactive, and/or calibration maintenance are tracked. ► Radiological or hazardous materials undergo additional controls. - Abstract: The National Ignition Facility (NIF) is the world's largest laser composed of millions of individual parts brought together to form one massive assembly. Maintaining control of the physical definition, status and configuration of this structure is a monumental undertaking yet critical to the validity of experimental data and the safe operation of the facility. A major programmatic challenge is to deploy software solutions to effectively manage the definition, build, operation, and maintenance, and configuration control of all components of NIF. The strategy for meeting this challenge involves deploying and integrating an enterprise application suite of solutions consisting of both Commercial-Off-The-Shelf (COTS) products and custom developed software.This paper describes how this strategy has been implemented along with a discussion on the successes realized and the ongoing challenges associated with this approach.

  10. Management of Organizational Change Processes

    Directory of Open Access Journals (Sweden)

    Vladimir-Codrin Ionescu

    2015-12-01

    Full Text Available Contemporary organizations need to understand the meaning of change and to tackle it as a source for improving processes and activities, aiming at increasing the performance and competitiveness. From this perspective, the paper presents approaches to organizational change and highlights the fundamental objectives which the organizations set for themselves by designing and implementing organizational change programs. The conceptual framework of the change management is defined and the stages of the change management process are presented. In the final part of the paper the problem of resistance to change is highlighted by explaining the content of the stages that employees go through in the process of adapting to change within organizations

  11. Development and implementation of product configuration systems - a change management perspective

    DEFF Research Database (Denmark)

    Møldrup, Morten; Møller, Niels

    2004-01-01

    Product configuration systems (PCS) are IT-based expert systems, which contain product information and knowledge and in turn provide the basis for automating the decision-making processes in the order acquisition phase. Thereby PCS support and streamline the efforts of an organisations sales force...... in translating customer demands into customized products within a bounded range of product variation. Supported by a PCS the sales representatives are empowered to configure products without having to consult experts about product specific dependencies. Although several research projects have been carried out...... within the field of PCS, these efforts have primarily been focused on technical aspects. Based on experiences gained from twelve case studies in the context of the PETO (*) project, this article therefore sets out to broaden the scope of the PCS field to embrace managerial and organizational aspects...

  12. AZ-101 Mixer Pump Demonstration Data Acquisition System and Gamma Cart Data Acquisition Control System Software Configuration Management Plan

    International Nuclear Information System (INIS)

    WHITE, D.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the AZ1101 Mixer Pump Demonstration Data Acquisition System (DAS) and the Sludge Mobilization Cart (Gamma Cart) Data Acquisition and Control System (DACS)

  13. Utilizing product configuration systems for supporting the critical parts of the engineering processes

    DEFF Research Database (Denmark)

    Kristjansdottir, Katrin; Shafiee, Sara; Hvam, Lars

    2016-01-01

    Engineering-To-Order (ETO) companies have to respond to increasing demands to provide highly customized and complex products with high quality at competitive prices. In order to respond to those challenges ETO companies have started to implement product configuration systems (PCS) to increase...... to be supported with the PCSs is not described in the current literature. This paper aims to pursue that research opportunity by presenting a framework, which aims to identifying the critical parts of the engineering processes in order to identify where it most beneficial to implement a PCSs and how to prioritize...

  14. Electronic Handbooks Simplify Process Management

    Science.gov (United States)

    2012-01-01

    Getting a multitude of people to work together to manage processes across many organizations for example, flight projects, research, technologies, or data centers and others is not an easy task. Just ask Dr. Barry E. Jacobs, a research computer scientist at Goddard Space Flight Center. He helped NASA develop a process management solution that provided documenting tools for process developers and participants to help them quickly learn, adapt, test, and teach their views. Some of these tools included editable files for subprocess descriptions, document descriptions, role guidelines, manager worksheets, and references. First utilized for NASA's Headquarters Directives Management process, the approach led to the invention of a concept called the Electronic Handbook (EHB). This EHB concept was successfully applied to NASA's Small Business Innovation Research (SBIR) and Small Business Technology Transfer (STTR) programs, among other NASA programs. Several Federal agencies showed interest in the concept, so Jacobs and his team visited these agencies to show them how their specific processes could be managed by the methodology, as well as to create mockup versions of the EHBs.

  15. The process of Risk management for E-business

    Directory of Open Access Journals (Sweden)

    Erion Lekaj

    2017-07-01

    Full Text Available In the new Internet economy, risk management plays a critical role to protect the organization and its ability to perform their business mission, not just its IT assets. Risk management is the process of identifying risk, assessing risk, and taking steps to reduce risk to an acceptable level. The risk management is an important component of an IT security program. Information and communications technology management and IT security are responsible for ensuring that technology risks are managed appropriately. These risks originate from the deployment and use of IT assets in various ways, such as configuring systems incorrectly or gaining access to restricted soft ware.

  16. Project W-211, initial tank retrieval systems, retrieval control system software configuration management plan

    International Nuclear Information System (INIS)

    RIECK, C.A.

    1999-01-01

    This Software Configuration Management Plan (SCMP) provides the instructions for change control of the W-211 Project, Retrieval Control System (RCS) software after initial approval/release but prior to the transfer of custody to the waste tank operations contractor. This plan applies to the W-211 system software developed by the project, consisting of the computer human-machine interface (HMI) and programmable logic controller (PLC) software source and executable code, for production use by the waste tank operations contractor. The plan encompasses that portion of the W-211 RCS software represented on project-specific AUTOCAD drawings that are released as part of the C1 definitive design package (these drawings are identified on the drawing list associated with each C-1 package), and the associated software code. Implementation of the plan is required for formal acceptance testing and production release. The software configuration management plan does not apply to reports and data generated by the software except where specifically identified. Control of information produced by the software once it has been transferred for operation is the responsibility of the receiving organization

  17. ANALYSIS OF SPECIAL WASTE CONFIGURATIONS AT THE SRS WASTE MANAGEMENT FACILITIES

    International Nuclear Information System (INIS)

    Casella, V; Raymond Dewberry, R

    2007-01-01

    Job Control Waste (JCW) at the Savannah River Site (SRS) Solid Waste Management Facilities (SWMF) may be disposed of in special containers, and the analysis of these containers requires developing specific analysis methodologies. A method has been developed for the routine assay of prohibited items (liquids, etc.) contained in a 30-gallon drum that is then placed into a 55-gallon drum. Method development consisted of system calibration with a NIST standard at various drum-to-detector distances, method verification with a liquid sample containing a known amount of Pu-238, and modeling the inner container using Ortec Isotopic software. Using this method for measurement of the known standard in the drum-in-drum configuration produced excellent agreement (within 15%) with the known value. Savannah River Site Solid Waste Management also requested analysis of waste contained in large black boxes (commonly 18-feet x 12-feet x 7-feet) stored at the SWMF. These boxes are frequently stored in high background areas and background radiation must be considered for each analysis. A detection limit of less than 150 fissile-gram-equivalents (FGE) of TRU waste is required for the black-box analyses. There is usually excellent agreement for the measurements at different distances and measurement uncertainties of about 50% are obtained at distances of at least twenty feet from the box. This paper discusses the experimental setup, analysis and data evaluation for drum-in-drum and black box waste configurations at SRS

  18. Wireless online position monitoring of manual valve types for plant configuration management in nuclear power plants

    International Nuclear Information System (INIS)

    Agarwal, Vivek; Buttles, John W.; Beaty, Lawrence H.; Naser, Joseph; Hallbert, Bruce P.

    2016-01-01

    In the current competitive energy market, the nuclear industry is committed to lower the operations and maintenance cost; increase productivity and efficiency while maintaining safe and reliable operation. The present operating model of nuclear power plants is dependent on large technical staffs that put the nuclear industry at long-term economic disadvantage. Technology can play a key role in nuclear power plant configuration management in offsetting labor costs by automating manually performed plant activities. The technology being developed, tested, and demonstrated in this paper will enable the continued safe operation of today’s fleet of light water reactors by providing the technical means to monitor components in plants today that are only routinely monitored through manual activities. The wireless enabled valve position indicators that are the subject of this paper are able to provide a valid position indication available continuously, rather than only periodically. As a result, a real-time (online) availability of valve positions using an affordable technologies are vital to plant configuration when compared with long-term labor rates, and provide information that can be used for a variety of plant engineering, maintenance, and management applications.

  19. Modelling Hospital Materials Management Processes

    Directory of Open Access Journals (Sweden)

    Raffaele Iannone

    2013-06-01

    integrated and detailed analysis and description model for hospital materials management data and tasks, which is able to tackle information from patient requirements to usage, from replenishment requests to supplying and handling activities. The model takes account of medical risk reduction, traceability and streamlined processes perspectives. Second, the paper translates this information into a business process model and mathematical formalization.The study provides a useful guide to the various relevant technology‐related, management and business issues, laying the foundations of an efficient reengineering of the supply chain to reduce healthcare costs and improve the quality of care.

  20. Configuration and supervision of advanced distributed data acquisition and processing systems for long pulse experiments using JINI technology

    International Nuclear Information System (INIS)

    Gonzalez, Joaquin; Ruiz, Mariano; Barrera, Eduardo; Lopez, Juan Manuel; de Arcas, Guillermo; Vega, Jesus

    2009-01-01

    The development of tools for managing the capabilities and functionalities of distributed data acquisition systems is essential in long pulse fusion experiments. The intelligent test and measurement system (ITMS) developed by UPM and CIEMAT is a technology that permits implementation of a scalable data acquisition and processing system based on PXI or CompactPCI hardware. Several applications based on JINI technology have been developed to enable use of this platform for extensive implementation of distributed data acquisition and processing systems. JINI provides a framework for developing service-oriented, distributed applications. The applications are based on the paradigm of a JINI federation that supports mechanisms for publication, discovering, subscription, and links to remote services. The model we implemented in the ITMS platform included services in the system CPU (SCPU) and peripheral CPUs (PCPUs). The resulting system demonstrated the following capabilities: (1) setup of the data acquisition and processing to apply to the signals, (2) information about the evolution of the data acquisition, (3) information about the applied data processing and (4) detection and distribution of the events detected by the ITMS software applications. With this approach, software applications running on the ITMS platform can be understood, from the perspective of their implementation details, as a set of dynamic, accessible, and transparent services. The search for services is performed using the publication and subscription mechanisms of the JINI specification. The configuration and supervision applications were developed using remotely accessible (LAN or WAN) objects. The consequence of this approach is a hardware and software architecture that provides a transparent model of remote configuration and supervision, and thereby a means to simplify the implementation of a distributed data acquisition system with scalable and dynamic local processing capability developed in a

  1. Configuration and supervision of advanced distributed data acquisition and processing systems for long pulse experiments using JINI technology

    Energy Technology Data Exchange (ETDEWEB)

    Gonzalez, Joaquin; Ruiz, Mariano [Grupo de Investigacion en Instrumentacion y Acustica Aplicada, Universidad Politecnica de Madrid (UPM), Ctra. Valencia Km-7, 28031, Madrid (Spain); Barrera, Eduardo [Grupo de Investigacion en Instrumentacion y Acustica Aplicada, Universidad Politecnica de Madrid (UPM), Ctra. Valencia Km-7, 28031, Madrid (Spain)], E-mail: eduardo.barrera@upm.es; Lopez, Juan Manuel; de Arcas, Guillermo [Grupo de Investigacion en Instrumentacion y Acustica Aplicada, Universidad Politecnica de Madrid (UPM), Ctra. Valencia Km-7, 28031, Madrid (Spain); Vega, Jesus [Asociacion EURATOM/CIEMAT para Fusion, Avda. Complutense 22, 28040, Madrid (Spain)

    2009-06-15

    The development of tools for managing the capabilities and functionalities of distributed data acquisition systems is essential in long pulse fusion experiments. The intelligent test and measurement system (ITMS) developed by UPM and CIEMAT is a technology that permits implementation of a scalable data acquisition and processing system based on PXI or CompactPCI hardware. Several applications based on JINI technology have been developed to enable use of this platform for extensive implementation of distributed data acquisition and processing systems. JINI provides a framework for developing service-oriented, distributed applications. The applications are based on the paradigm of a JINI federation that supports mechanisms for publication, discovering, subscription, and links to remote services. The model we implemented in the ITMS platform included services in the system CPU (SCPU) and peripheral CPUs (PCPUs). The resulting system demonstrated the following capabilities: (1) setup of the data acquisition and processing to apply to the signals, (2) information about the evolution of the data acquisition, (3) information about the applied data processing and (4) detection and distribution of the events detected by the ITMS software applications. With this approach, software applications running on the ITMS platform can be understood, from the perspective of their implementation details, as a set of dynamic, accessible, and transparent services. The search for services is performed using the publication and subscription mechanisms of the JINI specification. The configuration and supervision applications were developed using remotely accessible (LAN or WAN) objects. The consequence of this approach is a hardware and software architecture that provides a transparent model of remote configuration and supervision, and thereby a means to simplify the implementation of a distributed data acquisition system with scalable and dynamic local processing capability developed in a

  2. "It's All about Standardisation"--Exploring the Digital (Re)Configuration of School Management and Administration

    Science.gov (United States)

    Selwyn, Neil

    2011-01-01

    Schools have long made use of digital technologies to support the co-ordination of management and administrative processes--not least "management information systems", "virtual learning environments" and other "institutional technologies". The last five years have seen the convergence of these technologies into…

  3. Ways to integrate document management systems with industrial plant configuration management systems

    International Nuclear Information System (INIS)

    Munoz, M.

    1995-01-01

    Based on experience gained from tasks carried out for Almaraz Nuclear Power Plant, this paper describes computer platforms used both at the power plant and in the main offices of the engineering company. Subsequently, a description is given of the procedure followed for the continuous up-dating of plant documentation, in order to maintain consistency with other information stored in data bases in the Operation Management System, Maintenance System, Modification Management System, etc. The work method used for the unitary updating of all information (document images and attributes corresponding to the different data bases), following refuelling procedures is also described. Lastly, the paper describes the functions and the user interface of the system used in the power plant for document management. (Author)

  4. Validation and configuration management plan for the KE basins KE-PU spreadsheet code

    International Nuclear Information System (INIS)

    Harris, R.A.

    1996-01-01

    This report provides documentation of the spreadsheet KE-PU software that is used to verify compliance with the Operational Safety Requirement and Process Standard limit on the amount of plutonium in the KE-Basin sandfilter backwash pit. Included are: A summary of the verification of the method and technique used in KE-PU that were documented elsewhere, the requirements, plans, and results of validation tests that confirm the proper functioning of the software, the procedures and approvals required to make changes to the software, and the method used to maintain configuration control over the software

  5. SU-E-P-59: A Graphical Interface for XCAT Phantom Configuration, Generation and Processing

    International Nuclear Information System (INIS)

    Myronakis, M; Cai, W; Dhou, S; Cifter, F; Lewis, J; Hurwitz, M

    2015-01-01

    Purpose: To design a comprehensive open-source, publicly available, graphical user interface (GUI) to facilitate the configuration, generation, processing and use of the 4D Extended Cardiac-Torso (XCAT) phantom. Methods: The XCAT phantom includes over 9000 anatomical objects as well as respiratory, cardiac and tumor motion. It is widely used for research studies in medical imaging and radiotherapy. The phantom generation process involves the configuration of a text script to parameterize the geometry, motion, and composition of the whole body and objects within it, and to generate simulated PET or CT images. To avoid the need for manual editing or script writing, our MATLAB-based GUI uses slider controls, drop-down lists, buttons and graphical text input to parameterize and process the phantom. Results: Our GUI can be used to: a) generate parameter files; b) generate the voxelized phantom; c) combine the phantom with a lesion; d) display the phantom; e) produce average and maximum intensity images from the phantom output files; f) incorporate irregular patient breathing patterns; and f) generate DICOM files containing phantom images. The GUI provides local help information using tool-tip strings on the currently selected phantom, minimizing the need for external documentation. The DICOM generation feature is intended to simplify the process of importing the phantom images into radiotherapy treatment planning systems or other clinical software. Conclusion: The GUI simplifies and automates the use of the XCAT phantom for imaging-based research projects in medical imaging or radiotherapy. This has the potential to accelerate research conducted with the XCAT phantom, or to ease the learning curve for new users. This tool does not include the XCAT phantom software itself. We would like to acknowledge funding from MRA, Varian Medical Systems Inc

  6. SU-E-P-59: A Graphical Interface for XCAT Phantom Configuration, Generation and Processing

    Energy Technology Data Exchange (ETDEWEB)

    Myronakis, M; Cai, W; Dhou, S; Cifter, F; Lewis, J [Brigham and Women’s Hospital, Boston, MA (United States); Hurwitz, M [Newton, MA (United States)

    2015-06-15

    Purpose: To design a comprehensive open-source, publicly available, graphical user interface (GUI) to facilitate the configuration, generation, processing and use of the 4D Extended Cardiac-Torso (XCAT) phantom. Methods: The XCAT phantom includes over 9000 anatomical objects as well as respiratory, cardiac and tumor motion. It is widely used for research studies in medical imaging and radiotherapy. The phantom generation process involves the configuration of a text script to parameterize the geometry, motion, and composition of the whole body and objects within it, and to generate simulated PET or CT images. To avoid the need for manual editing or script writing, our MATLAB-based GUI uses slider controls, drop-down lists, buttons and graphical text input to parameterize and process the phantom. Results: Our GUI can be used to: a) generate parameter files; b) generate the voxelized phantom; c) combine the phantom with a lesion; d) display the phantom; e) produce average and maximum intensity images from the phantom output files; f) incorporate irregular patient breathing patterns; and f) generate DICOM files containing phantom images. The GUI provides local help information using tool-tip strings on the currently selected phantom, minimizing the need for external documentation. The DICOM generation feature is intended to simplify the process of importing the phantom images into radiotherapy treatment planning systems or other clinical software. Conclusion: The GUI simplifies and automates the use of the XCAT phantom for imaging-based research projects in medical imaging or radiotherapy. This has the potential to accelerate research conducted with the XCAT phantom, or to ease the learning curve for new users. This tool does not include the XCAT phantom software itself. We would like to acknowledge funding from MRA, Varian Medical Systems Inc.

  7. Configuring a Graphical User Interface for Managing Local HYSPLIT Model Runs Through AWIPS

    Science.gov (United States)

    Wheeler, mark M.; Blottman, Peter F.; Sharp, David W.; Hoeth, Brian; VanSpeybroeck, Kurt M.

    2009-01-01

    Responding to incidents involving the release of harmful airborne pollutants is a continual challenge for Weather Forecast Offices in the National Weather Service. When such incidents occur, current protocol recommends forecaster-initiated requests of NOAA's Hybrid Single-Particle Lagrangian Integrated Trajectory (HYSPLIT) model output through the National Centers of Environmental Prediction to obtain critical dispersion guidance. Individual requests are submitted manually through a secured web site, with desired multiple requests submitted in sequence, for the purpose of obtaining useful trajectory and concentration forecasts associated with the significant release of harmful chemical gases, radiation, wildfire smoke, etc., into local the atmosphere. To help manage the local HYSPLIT for both routine and emergency use, a graphical user interface was designed for operational efficiency. The interface allows forecasters to quickly determine the current HYSPLIT configuration for the list of predefined sites (e.g., fixed sites and floating sites), and to make any necessary adjustments to key parameters such as Input Model. Number of Forecast Hours, etc. When using the interface, forecasters will obtain desired output more confidently and without the danger of corrupting essential configuration files.

  8. Purification of Contaminated MIL-PRF-83282 Hydraulic Fluid Using the Pall Purifier and Multiple Process Configurations (Preprint)

    National Research Council Canada - National Science Library

    Snyder, Jr., Carl E; Gschwender, Lois J; Gunderson, Stephen L; Fultz, George W

    2006-01-01

    .... This report describes a project that evaluated the effectiveness of various hydraulic fluid purification process configurations on the removal of water and particulate contaminants from MIL-PRF-83282...

  9. Performance evaluation of extractor cutting blade configuration in Inulin extraction process from Dahlia sp. L tuber

    Science.gov (United States)

    Sundari, E.; Praputri, E.; Marthiana, W.; Jaya, M.

    2018-03-01

    Inulin, a polysaccharide plant-based nutrient, can be isolated from dahlia flower tubers by liquid-solid extraction processes and is generally carried out in an extractor tank equipped with an agitator. To accelerate the diffusion rate of solute from the solid phase (bulk phase) to the external surface (boundary layer) in order to increase yield of inulin, the size reduction of material is required. The purpose of this research was to design the cutting blade needed for dahlia tuber size reduction and investigate the effect of blade types, agitator speed (350, 700, 1050, and 1400 rpm), and configuration of cutting blade to material fineness at 90 minutes of contacting time. The results showed that higher cutting blade speed results in higher cut material fineness rate. The best conditions was achieved by the configuration of two four-blade turbine combined with one three-blade turbine with fineness rate more than 90% in 30 minutes of contacting time at every variation of agitator speed. The cutting blade designed in this study can be used for size reduction purpose of tubers other than dahlia tubers.

  10. USAR managing and updating process

    International Nuclear Information System (INIS)

    Prah, M.; Spiler, J.

    1996-01-01

    In this paper basis and background of the FSAR (Final Safety Analysis Report) document and its conversion process to the USAR (Updated Safety Analysis Report) document are described. In addition, there are internal and external reviews as approval process presented. The following is included in our new approach to manage USAR changes: initiating the USAR change, technical reviewing, preparing a safety evaluation, KSC (Krsko Safety Committee) and KOC (Krsko Operating Committee) review, ESD Director approval, and the Regulatory Body review or approval. The intensive technological modification activities started in the year 1992 when the NEK Engineering Services Division was established. These activities are one of the most important reason for a very intensive USAR items change. The other reason for its conversation to an electronic format is a possibility for easier and faster searching, updating and changing process and introducing a new systematic USAR managing approach as mentioned above. (author)

  11. Combined application of Product Lifecycle and Software Configuration Management systems for ITER remote handling

    International Nuclear Information System (INIS)

    Muhammad, Ali; Esque, Salvador; Aha, Liisa; Mattila, Jouni; Siuko, Mikko; Vilenius, Matti; Jaervenpaeae, Jorma; Irving, Mike; Damiani, Carlo; Semeraro, Luigi

    2009-01-01

    The advantages of Product Lifecycle Management (PLM) systems are widely understood among the industry and hence a PLM system is already in use by International Thermonuclear Experimental Reactor (ITER) Organization (IO). However, with the increasing involvement of software in the development, the role of Software Configuration Management (SCM) systems have become equally important. The SCM systems can be useful to meet the higher demands on Safety Engineering (SE), Quality Assurance (QA), Validation and Verification (V and V) and Requirements Management (RM) of the developed software tools. In an experimental environment, such as ITER, the new remote handling requirements emerge frequently. This means the development of new tools or the modification of existing tools and the development of new remote handling procedures or the modification of existing remote handling procedures. PLM and SCM systems together can be of great advantage in the development and maintenance of such remote handling system. In this paper, we discuss how PLM and SCM systems can be integrated together and play their role during the development and maintenance of ITER remote handling system. We discuss the possibility to investigate such setup at DTP2 (Divertor Test Platform 2), which is the full scale mock-up facility to verify the ITER divertor remote handling and maintenance concepts.

  12. C-shaped root canal configuration in mandibular second premolar: Report of an unusual case and its endodontic management

    Directory of Open Access Journals (Sweden)

    Dipali Y Shah

    2012-01-01

    Full Text Available The C-shaped root canal system is an aberration of the root canal system in which a characteristic fin or web connects individual canals, resulting in a C-shaped cross section. This configuration has been rarely reported in the mandibular second premolar. The only other known reported case of a C-shaped canal, with its configuration, in relation to mandibular second premolar is of an extracted tooth. The purpose of this report is to describe the diagnosis, configuration and endodontic management of C-shaped root canal in mandibular second premolar. Clinical techniques to addresses the challenges in endodontic disinfection as well as cleaning and shaping of the C-shaped canal, which is prone to endodontic mishaps, are also discussed in this case report. Reporting of this case emphasizes the need and added advantage of using the dental operating microscope hand in hand with conventional radiography in management of the C-shaped root canal configuration.

  13. Artificial intelligence and process management

    International Nuclear Information System (INIS)

    Epton, J.B.A.

    1989-01-01

    Techniques derived from work in artificial intelligence over the past few decades are beginning to change the approach in applying computers to process management. To explore this new approach and gain real practical experience of its potential a programme of experimental applications was initiated by Sira in collaboration with the process industry. This programme encompassed a family of experimental applications ranging from process monitoring, through supervisory control and troubleshooting to planning and scheduling. The experience gained has led to a number of conclusions regarding the present level of maturity of the technology, the potential for further developments and the measures required to secure the levels of system integrity necessary in on-line applications to critical processes. (author)

  14. Effects of background neutral particles on a field-reversed configuration plasma in the translation process

    International Nuclear Information System (INIS)

    Matsuzawa, Yoshiki; Asai, Tomohiko; Takahashi, Tsutomu; Takahashi, Toshiki

    2008-01-01

    A field-reversed configuration (FRC) plasma was translated into a weakly ionized plasma and the effects of heating and particle buildup of the FRC plasma due to the background neutral particles and plasma injection in the translation process were investigated. Improvement of the particle and poloidal flux confinements and delay of onset of n=2 rotational instability were observed in the translation process. It was found that the internal structure of the plasma pressure (plasma temperature and density) at the separatrix and field null was deformed by the particle injection. FRC plasma translation through the background particles was equivalent to an end-on particle beam injection to the FRC plasma. Particles and energy were supplied during the translation. The results obtained for the phenomena of particle supply and plasma heating were also supported by the results of two-dimensional particle simulation. The effects of background particle injection appear to be a promising process for the regeneration of translation kinetic energy to plasma internal energy

  15. Evaluation of Early Ground Control Station Configurations for Interacting with a UAS Traffic Management (UTM) System

    Science.gov (United States)

    Dao, Arik-Quang V.; Martin, Lynne; Mohlenbrink, Christoph; Bienert, Nancy; Wolte, Cynthia; Gomez, Ashley; Claudatos, Lauren; Mercer, Joey

    2017-01-01

    The purpose of this paper is to report on a human factors evaluation of ground control station design concepts for interacting with an unmanned traffic management system. The data collected for this paper comes from recent field tests for NASA's Unmanned Traffic Management (UTM) project, and covers the following topics; workload, situation awareness, as well as flight crew communication, coordination, and procedures. The goal of this evaluation was to determine if the various software implementations for interacting with the UTM system can be described and classified into design concepts to provide guidance for the development of future UTM interfaces. We begin with a brief description of NASA's UTM project, followed by a description of the test range configuration related to a second development phase. We identified (post hoc) two classes in which the ground control stations could be grouped. This grouping was based on level of display integration. The analysis was exploratory and informal. It was conducted to compare ground stations across those two classes and against the aforementioned topics. Herein, we discuss the results.

  16. Impact of reactor configuration on anammox process start-up: MBR versus SBR.

    Science.gov (United States)

    Tao, Yu; Gao, Da-Wen; Fu, Yuan; Wu, Wei-Min; Ren, Nan-Qi

    2012-01-01

    Anaerobic ammonium oxidation (anammox) is an energy saving biological nitrogen removal process which was limited to slow growth rate of anammox bacteria during start-up period. This study investigated the start-up of anammox process by a laboratory sequential batch reactor (SBR) for 218 days and subsequently modified the reactor as a membrane bioreactor (MBR) for 178 days. Modification of a SBR as MBR with installation of an external membrane module resulted in acceleration of specific anammox activity by 19 times. The acceleration of specific anammox activity with MBR was further confirmed by starting-up another MBR for a 242 day period. Molecular microbial analyses showed that Candidatus "Brocadia anammoxidans" and Candidatus "Kuenenia stuttgartiensis" were the dominant species in the inocula and biomass developed in the reactor. The start-up with MBR appeared to be more effective than SBR for the enrichment of anammox bacteria due to high sludge retention property of MBR configuration. Copyright © 2011 Elsevier Ltd. All rights reserved.

  17. Risk-based configuration control

    International Nuclear Information System (INIS)

    Szikszai, T.

    1997-01-01

    The presentation discusses the following issues: The Configuration Control; The Risk-based Configuration Control (during power operation mode, and during shutdown mode). PSA requirements. Use of Risk-based Configuration Control System. Configuration Management (basic elements, benefits, information requirements)

  18. Face Recognition in 4- to 7-Year-Olds: Processing of Configural, Featural, and Paraphernalia Information.

    Science.gov (United States)

    Freire, Alejo; Lee, Kang

    2001-01-01

    Tested in two studies 4- to 7-year-olds' face recognition by manipulating the faces' configural and featural information. Found that even with only a single 5-second exposure, most children could use configural and featural cues to make identity judgments. Repeated exposure and feedback improved others' performance. Even proficient memories were…

  19. Process Modeling, Performance Analysis and Configuration Simulation in Integrated Supply Chain Network Design

    OpenAIRE

    Dong, Ming

    2001-01-01

    Supply chain management has been recently introduced to address the integration of organizational functions ranging from the ordering and receipt of raw materials throughout the manufacturing processes, to the distribution and delivery of products to the customer. Its application demonstrates that this idea enables organizations to achieve higher quality products, better customer service, and lower inventory cost. In order to achieve high performance, supply chain functions must operate ...

  20. What is Business Process Management?

    DEFF Research Database (Denmark)

    Møller, Charles; Tan, Rune Domino; Maack, Carsten Jessen

    2007-01-01

    Business Process Management (BPM) is an emerging new field in business. However there is no academically agreed upon conceptual framework. The aim of this paper is to establish a conceptual framework grounded in the recent literature. The purpose of this work is to ensure a better foundation...... for future research and to discussion of the implications of BPM on Enterprise Information Systems (EIS). The starting point of this study is a focused literature review of the BPM concept. This literature review leads to the formulation of a conceptual framework for BPM which is evaluated using...

  1. Environmental management of business processes

    Directory of Open Access Journals (Sweden)

    Vesna Čančer

    2000-01-01

    Full Text Available Since the decision-makers in enterprises will accept the goals of environmental management only if they are motivated enough, comprehensible and useful tools should be generated to support environmentally oriented business decision-making. For that reason, a general optimisation model of the multiphase business process is presented in this paper. This model includes the possibilities for an integrated approach to environmental protection so that it can be applied as a scenario by the business process simulation for the evaluation of environmentally oriented business decisions on business performance. Furthermore, development and application possibilities of the presented model are introduced. Some measures of resource efficiency are developed using the presented optimisation model.

  2. CAVEMAN: Configuration And VErsion MANagement. User`s guide, v2.1.2

    Energy Technology Data Exchange (ETDEWEB)

    Dyer, K.M.

    1993-03-12

    The mission of the CAVEMAN project is to provide the tools for large code systems so that those who work on them can perform source control and configuration control on UNIX-based file servers, rather than the LC Crays. An outside product called cvs has been chosen as the underlying source control system. The initials stand for {open_quotes}Concurrent Versions System{close_quotes}. It is a freeware program that runs on most UNIX stations. To quote from the cvs man page: {open_quotes}cvs is a front end to the rcs revision control system which extends the notion of revision control from a collection of files in a single directory to a hierarchical collection of directories consisting of revision controlled files. These directories and files can be combined together to form a software release. cvs provides the functions necessary to manage these software releases and to control the concurrent editing of source files among multiple software developers.{close_quotes} While cvs may be run directly, there are several tasks in the LLNL environment that it seemed either safer or easier to automate. CAVEMAN provides the needed functionality, generally in the form of wrappers to cvs.

  3. Tolerance to spatial-relational transformations in unfamiliar faces: A further challenge to a configural processing account of identity recognition.

    Science.gov (United States)

    Lorenzino, Martina; Caminati, Martina; Caudek, Corrado

    2018-05-25

    One of the most important questions in face perception research is to understand what information is extracted from a face in order to recognize its identity. Recognition of facial identity has been attributed to a special sensitivity to "configural" information. However, recent studies have challenged the configural account by showing that participants are poor in discriminating variations of metric distances among facial features, especially for familiar as opposed to unfamiliar faces, whereas a configural account predicts the opposite. We aimed to extend these previous results by examining classes of unfamiliar faces with which we have different levels of expertise. We hypothesized an inverse relation between sensitivity to configural information and expertise with a given class of faces, but only for neutral expressions. By first matching perceptual discriminability, we measured tolerance to subtle configural transformations with same-race (SR) versus other-race (OR) faces, and with upright versus upside-down faces. Consistently with our predictions, we found a lower sensitivity to at-threshold configural changes for SR compared to OR faces. We also found that, for our stimuli, the face inversion effect disappeared for neutral but not for emotional faces - a result that can also be attributed to a lower sensitivity to configural transformations for faces presented in a more familiar orientation. The present findings question a purely configural account of face processing and suggest that the role of spatial-relational information in face processing varies according to the functional demands of the task and to the characteristics of the stimuli. Copyright © 2018 Elsevier B.V. All rights reserved.

  4. A Study on the Functional Elements of Configuration Management throughout the Life Cycle of Nuclear Power Plant

    International Nuclear Information System (INIS)

    Yeom, C. S.; Cho, Y. S.

    2013-01-01

    Configuration Management (CM) is a technical and management process for maintaining consistency and traceability of any performance, functional and physical attributes of SSCs (Structures, Systems, or Components) with its requirements, design, and operational information. SSCs are the elements which make up a 'facility.' A structure is an element that provides support or enclosure. A system is a collection of components assembled to perform a specific facility function(s). A component is an active or passive item of equipment such as a pump, valve, relay, or an element of a large array such as pipe segments, elbows or reducers. For applying CM to nuclear industry, it is necessary to investigate and define the functional elements comprising CM. The elements can be used in planning and executing CM. Appropriate application of CM elements enables a user to plan and implement a CM program for SSCs of NPP. Although each element is separated, its implementation should not be performed in isolation because the CM elements should be balanced, consistent, and tracked. The degree of CM elements' application varies over the life cycle of NPP. The degree of rigor and techniques used in implementing CM is commensurate with type of NPP and its application environment as defined by the CM program requirements. For the consideration, it is necessary to make a CM STANDARD, and HANDBOOK or GUIDELINE for enabling more effective planning and implementing CM in nuclear industry

  5. HR professionals exploring cooperative configurational human resource management using a serious game: what do they miss?

    NARCIS (Netherlands)

    Collou, Luuk Dirk; Bruinsma, Guido Wybe Jan; van Riemsdijk, Maarten

    2017-01-01

    Configurational thinking in HRM is expected to increase understanding of the HRM-firm performance link and potentially aid HR professionals in the complex task of designing effective HRM. Here, we specify configurational theory in HRM to a level of detail that has been lacking. We present two

  6. Knowledge management: processes and systems | Igbinovia ...

    African Journals Online (AJOL)

    Knowledge management: processes and systems. ... Information Impact: Journal of Information and Knowledge Management ... observation, role reversal technique, and discussion forums as well as the forms of knowledge representation to include report writing, database management system and institutional repositories.

  7. Apolipoprotein A-I configuration and cell cholesterol efflux activity of discoidal lipoproteins depend on the reconstitution process.

    Science.gov (United States)

    Cuellar, Luz Ángela; Prieto, Eduardo Daniel; Cabaleiro, Laura Virginia; Garda, Horacio Alberto

    2014-01-01

    Discoidal high-density lipoproteins (D-HDL) are critical intermediates in reverse cholesterol transport. Most of the present knowledge of D-HDL is based on studies with reconstituted lipoprotein complexes of apolipoprotein A-I (apoA-I) obtained by cholate dialysis (CD). D-HDL can also be generated by the direct microsolubilization (DM) of phospholipid vesicles at the gel/fluid phase transition temperature, a process mechanistically similar to the "in vivo" apoAI lipidation via ABCA1. We compared the apoA-I configuration in D-HDL reconstituted with dimyristoylphosphatidylcholine by both procedures using fluorescence resonance energy transfer measurements with apoA-I tryptophan mutants and fluorescently labeled cysteine mutants. Results indicate that apoA-I configuration in D-HDL depends on the reconstitution process and are consistent with a "double belt" molecular arrangement with different helix registry. As reported by others, a configuration with juxtaposition of helices 5 of each apoAI monomer (5/5 registry) predominates in D-HDL obtained by CD. However, a configuration with helix 5 of one monomer juxtaposed with helix 2 of the other (5/2 registry) would predominate in D-HDL generated by DM. Moreover, we also show that the kinetics of cholesterol efflux from macrophage cultures depends on the reconstitution process, suggesting that apoAI configuration is important for this HDL function. Copyright © 2013 Elsevier B.V. All rights reserved.

  8. Communications and Information: Strategic Automated Command Control System-Data Transmission Subsystem (SACCS-DTS) Software Configuration Management and Change Control

    National Research Council Canada - National Science Library

    1997-01-01

    .... It prescribes the requirements, responsibilities, and procedures for operation, security, and configuration management of the Strategic Automated Command Control System-Data Transmission Subsystem (SACCS-DTS...

  9. Management of Technology - a political process approach

    DEFF Research Database (Denmark)

    Koch, Christian

    1999-01-01

    Most management of technology writings fail to address enterprise developments as political processes, where visions, coalitions and emergence are central features. The paper report of a participants observation study of management of technology processes.......Most management of technology writings fail to address enterprise developments as political processes, where visions, coalitions and emergence are central features. The paper report of a participants observation study of management of technology processes....

  10. Configuration Management and Infrastructure Monitoring Using CFEngine and Icinga for Real-time Heterogeneous Data Taking Environment

    Science.gov (United States)

    Poat, M. D.; Lauret, J.; Betts, W.

    2015-12-01

    The STAR online computing environment is an intensive ever-growing system used for real-time data collection and analysis. Composed of heterogeneous and sometimes groups of custom-tuned machines, the computing infrastructure was previously managed by manual configurations and inconsistently monitored by a combination of tools. This situation led to configuration inconsistency and an overload of repetitive tasks along with lackluster communication between personnel and machines. Globally securing this heterogeneous cyberinfrastructure was tedious at best and an agile, policy-driven system ensuring consistency, was pursued. Three configuration management tools, Chef, Puppet, and CFEngine have been compared in reliability, versatility and performance along with a comparison of infrastructure monitoring tools Nagios and Icinga. STAR has selected the CFEngine configuration management tool and the Icinga infrastructure monitoring system leading to a versatile and sustainable solution. By leveraging these two tools STAR can now swiftly upgrade and modify the environment to its needs with ease as well as promptly react to cyber-security requests. By creating a sustainable long term monitoring solution, the detection of failures was reduced from days to minutes, allowing rapid actions before the issues become dire problems, potentially causing loss of precious experimental data or uptime.

  11. Sample and data management process description

    International Nuclear Information System (INIS)

    Kessner, J.H.

    2000-01-01

    The sample and data management process was initiated in 1994 as a result of a process improvement workshop. The purpose of the workshop was to develop a sample and data management process that would reduce cycle time and costs, simplify systems and procedures, and improve customer satisfaction for sampling, analytical services, and data management activities

  12. Dynamic process management for engineering environments

    NARCIS (Netherlands)

    Mentink, R.J.; van Houten, Frederikus J.A.M.; Kals, H.J.J.

    2003-01-01

    The research presented in this paper proposes a concept for dynamic process management as part of an integrated approach to engineering process support. The theory of information management is the starting point for the development of a process management system based on evolution of information

  13. Managing Variety in Configure-to-Order Products - An Operational Method

    DEFF Research Database (Denmark)

    Myrodia, Anna; Hvam, Lars

    2014-01-01

    is to develop an operational method to analyze profitability of Configure-To-Order (CTO) products. The operational method consists of a four-step: analysis of product assortment, profitability analysis on configured products, market and competitor analysis and, product assortment scenarios analysis....... The proposed operational method is firstly developed based on both available literature and practitioners experience and subsequently tested on a company that produces CTO products. The results from this application are further discussed and opportunities for further research identified....

  14. Survey on the use of configuration risk and safety management tools at nuclear power plants. Final report

    International Nuclear Information System (INIS)

    Fleming, K.N.; Read, J.W.; Dagan, W.J.; Bidwell, D.A.

    1998-09-01

    In order to provide input to Electricite de France's (EDF) evaluation of the use of configuration safety and risk management tools in the French plants and to collect information to guide the EPRI efforts to provide useful tools for the EPRI member utilities and international partners, a joint effort to survey US and selected non-US nuclear power stations was conducted. This survey examined the use of various approaches, techniques, and software tools that are being used to evaluate the safety and risk aspects of plant configuration changes and configuration changes during plant outages as well as during power operation. The use of these tools has increased in recent years as a result of efforts to optimize plant maintenance programs, improve plant safety, and increase plant reliability and availability. This report provides the results of the survey of 37 organizations covering 54 nuclear plant sites and 97 reactor units

  15. THE STRATEGIC PERFORMANCE MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    Radu Catalina

    2009-05-01

    Full Text Available Contemporary trends in global competition, rapid technological developments and increased use of management information systems and the Internet, developments in planning and control and management thinking, and changing demographics are putting pressures

  16. Adaptive Process Management with ADEPT2

    NARCIS (Netherlands)

    Reichert, M.U.; Rinderle, S.B.; Kreher, U; Dadam, P.

    2005-01-01

    This demo paper describes core functions of the ADEPT2 process management system. In the ADEPT project we have been working on the design and implementation of a next generation process management software. Based on a conceptual framework for dynamic process changes, on novel process support

  17. How Configuration Management (CM) Can Help Project Teams To Innovate and Communicate

    Science.gov (United States)

    Cioletti, Louis

    2009-01-01

    Traditionally, CM is relegated to a support role in project management activities. CM s traditional functions of identification, change control, status accounting, and audits/verification are still necessary and play a vital role. However, this presentation proposes CM s role in a new and innovative manner that will significantly improve communication throughout the organization and, in turn, augment the project s success. CM s new role is elevated to the project management level, above the engineering or sub-project level in the Work Breakdown Structure (WBS), where it can more effectively accommodate changes, reduce corrective actions, and ensure that requirements are clear, concise, and valid, and that results conform to the requirements. By elevating CM s role in project management and orchestrating new measures, a new communication will emerge that will improve information integrity, structured baselines, interchangeability/traceability, metrics, conformance to standards, and standardize the best practices in the organization. Overall project performance (schedule, quality, and cost) can be no better than the ability to communicate requirements which, in turn, is no better than the CM process to communicate project decisions and the correct requirements.

  18. Self-Configuration and Self-Optimization Process in Heterogeneous Wireless Networks

    Directory of Open Access Journals (Sweden)

    Eduardo Camponogara

    2010-12-01

    Full Text Available Self-organization in Wireless Mesh Networks (WMN is an emergent research area, which is becoming important due to the increasing number of nodes in a network. Consequently, the manual configuration of nodes is either impossible or highly costly. So it is desirable for the nodes to be able to configure themselves. In this paper, we propose an alternative architecture for self-organization of WMN based on Optimized Link State Routing Protocol (OLSR and the ad hoc on demand distance vector (AODV routing protocols as well as using the technology of software agents. We argue that the proposed self-optimization and self-configuration modules increase the throughput of network, reduces delay transmission and network load, decreases the traffic of HELLO messages according to network’s scalability. By simulation analysis, we conclude that the self-optimization and self-configuration mechanisms can significantly improve the performance of OLSR and AODV protocols in comparison to the baseline protocols analyzed.

  19. Visual Processing in Adolescents with Autism Spectrum Disorder: Evidence from Embedded Figures and Configural Superiority Tests

    Science.gov (United States)

    Dillen, Claudia; Steyaert, Jean; Op de Beeck, Hans P.; Boets, Bart

    2015-01-01

    The embedded figures test has often been used to reveal weak central coherence in individuals with autism spectrum disorder (ASD). Here, we administered a more standardized automated version of the embedded figures test in combination with the configural superiority task, to investigate the effect of contextual modulation on local feature…

  20. Self-Configuration and Self-Optimization Process in Heterogeneous Wireless Networks

    Science.gov (United States)

    Guardalben, Lucas; Villalba, Luis Javier García; Buiati, Fábio; Sobral, João Bosco Mangueira; Camponogara, Eduardo

    2011-01-01

    Self-organization in Wireless Mesh Networks (WMN) is an emergent research area, which is becoming important due to the increasing number of nodes in a network. Consequently, the manual configuration of nodes is either impossible or highly costly. So it is desirable for the nodes to be able to configure themselves. In this paper, we propose an alternative architecture for self-organization of WMN based on Optimized Link State Routing Protocol (OLSR) and the ad hoc on demand distance vector (AODV) routing protocols as well as using the technology of software agents. We argue that the proposed self-optimization and self-configuration modules increase the throughput of network, reduces delay transmission and network load, decreases the traffic of HELLO messages according to network’s scalability. By simulation analysis, we conclude that the self-optimization and self-configuration mechanisms can significantly improve the performance of OLSR and AODV protocols in comparison to the baseline protocols analyzed. PMID:22346584

  1. Human Resource Management in the Enhancement Processes of Knowledge Management

    Directory of Open Access Journals (Sweden)

    Didi Sundiman

    2017-11-01

    Full Text Available This research explored Human Resource Management (HRM in enhancement processes of knowledge management. This research explored how HRM practice enhanced the operational of knowledge management. Data were collected by a survey by interviewing 12 informants from Small and Medium Enterprise (SME. The results show that HRM practice gives initiative in the enhancement process of the knowledge management strategy applied to the company. It can be concluded that each sub-component of HRM affects the components of knowledge management, and HRM is highly influential and has a positive effect on quality management processes and vice versa in the work environment.

  2. Software configuration management plan for the TWRS controlled baseline database system [TCBD

    International Nuclear Information System (INIS)

    Spencer, S.G.

    1998-01-01

    LHMC, TWRS Business Management Organization (BMO) is designated as system owner, operator, and maintenance authority. The TWAS BMO identified the need for the TCBD. The TWRS BMO users have established all requirements for the database and are responsible for maintaining database integrity and control (after the interface data has been received). Initial interface data control and integrity is maintained through functional and administrative processes and is the responsibility of the database owners who are providing the data. The specific groups within the TWRS BMO affected by this plan are the Financial Management and TWRS Management Support Project, Master Planning, and the Financial Control Integration and Reporting. The interfaces between these organizations are through normal line management chain of command. The Master Planning Group is assigned the responsibility to continue development and maintenance of the TCBD. This group maintains information that includes identification of requirements and changes to those requirements in a TCBD project file. They are responsible for the issuance, maintenance, and change authority of this SCW. LHMC, TWRS TCBD Users are designated as providing the project's requirement changes for implementation and also testing of the TCBD during development. The Master Planning Group coordinates and monitors the user's requests for system requirements (new/existing) as well as beta and acceptance testing. Users are those individuals and organizations needing data or information from the TCBD and having both a need-to-know and the proper training and authority to access the database. Each user or user organization is required to comply with the established requirements and procedures governing the TCBD. Lockheed Martin Services, Inc. (LMSI) is designated the TCBD developer, maintainer, and custodian until acceptance and process testing of the system has been completed via the TWRS BMO. Once this occurs, the TCBD will be completed and

  3. Thermal energy management process experiment

    Science.gov (United States)

    Ollendorf, S.

    1984-01-01

    The thermal energy management processes experiment (TEMP) will demonstrate that through the use of two-phase flow technology, thermal systems can be significantly enhanced by increasing heat transport capabilities at reduced power consumption while operating within narrow temperature limits. It has been noted that such phenomena as excess fluid puddling, priming, stratification, and surface tension effects all tend to mask the performance of two-phase flow systems in a 1-g field. The flight experiment approach would be to attack the experiment to an appropriate mounting surface with a 15 to 20 meter effective length and provide a heat input and output station in the form of heaters and a radiator. Using environmental data, the size, location, and orientation of the experiment can be optimized. The approach would be to provide a self-contained panel and mount it to the STEP through a frame. A small electronics package would be developed to interface with the STEP avionics for command and data handling. During the flight, heaters on the evaporator will be exercised to determine performance. Flight data will be evaluated against the ground tests to determine any anomalous behavior.

  4. Knowledge management vs business process management in contemporary enterprises

    Directory of Open Access Journals (Sweden)

    Bitkowska Agnieszka

    2016-06-01

    Full Text Available The main objective of this paper is to identify the system of knowledge management in contemporary process organizations in business process perspective, especially with regard to technological and social conditions. Methodology is based on literature analysis and case studies. The integration of knowledge management technologies, concepts and methods into organizational business processes is challenging research issue today. The concepts of knowledge management and business process management should be analyzed jointly in the contemporary enterprises. Despite of the growing interest among researchers and practitioners of the concept of the knowledge management referring to business process management there is a lack of articles in this area. Appropriate approach to the modelling of knowledge management processes, as well as the use of IT tools, and a motivation system are of key importance for the introduction of this solution in organizations.

  5. Avionics Configuration Assessment for Flightdeck Interval Management: A Comparison of Avionics and Notification Methods

    Science.gov (United States)

    Latorella, Kara A.

    2015-01-01

    Flightdeck Interval Management is one of the NextGen operational concepts that FAA is sponsoring to realize requisite National Airspace System (NAS) efficiencies. Interval Management will reduce variability in temporal deviations at a position, and thereby reduce buffers typically applied by controllers - resulting in higher arrival rates, and more efficient operations. Ground software generates a strategic schedule of aircraft pairs. Air Traffic Control (ATC) provides an IM clearance with the IM spacing objective (i.e., the TTF, and at which point to achieve the appropriate spacing from this aircraft) to the IM aircraft. Pilots must dial FIM speeds into the speed window on the Mode Control Panel in a timely manner, and attend to deviations between actual speed and the instantaneous FIM profile speed. Here, the crew is assumed to be operating the aircraft with autothrottles on, with autopilot engaged, and the autoflight system in Vertical Navigation (VNAV) and Lateral Navigation (LNAV); and is responsible for safely flying the aircraft while maintaining situation awareness of their ability to follow FIM speed commands and to achieve the FIM spacing goal. The objective of this study is to examine whether three Notification Methods and four Avionics Conditions affect pilots' performance, ratings on constructs associated with performance (workload, situation awareness), or opinions on acceptability. Three Notification Methods (alternate visual and aural alerts that notified pilots to the onset of a speed target, conformance deviation from the required speed profile, and reminded them if they failed to enter the speed within 10 seconds) were examined. These Notification Methods were: VVV (visuals for all three events), VAV (visuals for all three events, plus an aural for speed conformance deviations), and AAA (visual indications and the same aural to indicate all three of these events). Avionics Conditions were defined by the instrumentation (and location) used to

  6. Visual processing in adolescents with autism spectrum disorders: Evidence from embedded figures and configural superiority tests

    OpenAIRE

    Dillen, Claudia; Steyaert, Jean; Op de Beeck, Hans; Boets, Bart

    2015-01-01

    The embedded figures test has often been used to reveal weak central coherence in individuals with autism spectrum disorder (ASD). Here, we administered a more standardized automated version of the embedded figures test in combination with the configural superiority task, to investigate the effect of contextual modulation on local feature detection in 23 adolescents with ASD and 26 matched typically developing controls. On both tasks both groups performed l...

  7. Optimization and standardization of pavement management processes.

    Science.gov (United States)

    2004-08-01

    This report addresses issues related to optimization and standardization of current pavement management processes in Kentucky. Historical pavement management records were analyzed, which indicates that standardization is necessary in future pavement ...

  8. Managing Process Variants in the Process Life Cycle

    NARCIS (Netherlands)

    Hallerbach, A.; Bauer, Th.; Reichert, M.U.

    2007-01-01

    When designing process-aware information systems, often variants of the same process have to be specified. Each variant then constitutes an adjustment of a particular process to specific requirements building the process context. Current Business Process Management (BPM) tools do not adequately

  9. Incident Management: Process into Practice

    Science.gov (United States)

    Isaac, Gayle; Moore, Brian

    2011-01-01

    Tornados, shootings, fires--these are emergencies that require fast action by school district personnel, but they are not the only incidents that require risk management. The authors have introduced the National Incident Management System (NIMS) and the Incident Command System (ICS) and assured that these systems can help educators plan for and…

  10. Air Force Space Command. Space and Missile Systems Center Standard. Configuration Management

    Science.gov (United States)

    2008-06-13

    Engineering Drawing Practices IEEE STD 610.12 Glossary of Software Engineering Terminology, September 28,1990 ISO /IEC 12207 Software Life...item, regardless of media, formally designated and fixed at a specific time during the configuration item’s life cycle. (Source: ISO /IEC 12207

  11. Managing complexity of product mix and production flow in configure-to-order production systems

    DEFF Research Database (Denmark)

    Myrodia, Anna; Bonev, Martin; Hvam, Lars

    2014-01-01

    In designing configure-to-order production systems for a growing product variety, companies are challenged with an increased complexity for obtaining high productivity levels and cost-effectiveness. In academia several optimization methods and conceptual frameworks for substituting components, or...

  12. Enabling System Evolution through Configuration Management on the Hardware/Software Boundary

    NARCIS (Netherlands)

    Krikhaar, R.L.; Mosterman, W.; Veerman, N.P.; Verhoef, C.

    2009-01-01

    As the use of software and electronics in modern products is omnipresent and continuously increasing, companies in the embedded systems industry face increasing complexity in controlling and enabling the evolution of their IT-intensive products. Traditionally, product configurations and their

  13. PSA requirements for use in the safety management. Risk based indicators and the configurational control

    International Nuclear Information System (INIS)

    Szikszai, T.

    1994-01-01

    The purpose of this document is to show the role of the risk based indicators- namely the core damage frequency (CDFI), the core damage probability indicators (CDPI) and the importance of the equipment together- in the risk based configuration control. 1 fig

  14. Business process management and IT management: The missing integration

    DEFF Research Database (Denmark)

    Rahimi, Fatemeh; Møller, Charles; Hvam, Lars

    2016-01-01

    of IT on process innovations, the association between business process management and IT management is under-explored. Drawing on a literature analysis of the capabilities of business process and IT governance frameworks and findings from a case study, we propose the need for horizontal integration between the two......The importance of business processes and the centrality of IT to contemporary organizations' performance calls for a specific focus on business process management and IT management. Despite the wide scope of business process management covering both business and IT domains, and the profound impact...... management functions to enable strategic and operational business - IT alignment. We further argue that the role of IT in an organization influences the direction of integration between the two functions and thus the choice of integration mechanisms. Using case study findings, we propose...

  15. Method for Business Process Management System Selection

    NARCIS (Netherlands)

    Thijs van de Westelaken; Bas Terwee; Pascal Ravesteijn

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However

  16. A new approach in Business Process Management

    OpenAIRE

    Hurbean, Luminita

    2008-01-01

    The new wave of BPM (Business Process Management) is not Business Process Reenginering, enterprise application integration, workflow management or another packaged application – it's the synthesis and extension of all these technologies and techniques into a unified whole. This unified whole becomes a new foundation upon which the enterprise is built, an enterprise more in tune with the true nature of business processes and their management. In a competitive economy, where margins continu...

  17. Process-based software project management

    CERN Document Server

    Goodman, F Alan

    2006-01-01

    Not connecting software project management (SPM) to actual, real-world development processes can lead to a complete divorcing of SPM to software engineering that can undermine any successful software project. By explaining how a layered process architectural model improves operational efficiency, Process-Based Software Project Management outlines a new method that is more effective than the traditional method when dealing with SPM. With a clear and easy-to-read approach, the book discusses the benefits of an integrated project management-process management connection. The described tight coup

  18. Business Process Management Theory and Applications

    CERN Document Server

    2013-01-01

    Business Process Management (BPM) has been in existence for decades. It  uses, complements, integrates and extends theories, methods and tools from  other scientific disciplines like: strategic management, information technology, managerial accounting, operations management etc. During this period the main focus themes of researchers and professionals in BPM  were: business process modeling, business process analysis, activity based costing, business process simulation, performance measurement, workflow management, the link between information technology and BPM for process automation etc. More recently the focus moved to subjects like Knowledge Management, Enterprise Resource Planning (ERP) Systems, Service Oriented Architectures (SOAs), Process Intelligence (PI) and even  Social Networks. In this collection of papers we present a review of the work and the outcomes achieved in the classic BPM fields as well as a deeper insight on recent advances in BPM. We present a review of business process modeling a...

  19. BUSINESS PROCESS MANAGEMENT SYSTEMS TECHNOLOGY COMPONENTS ANALYSIS

    Directory of Open Access Journals (Sweden)

    Andrea Giovanni Spelta

    2007-05-01

    Full Text Available The information technology that supports the implementation of the business process management appproach is called Business Process Management System (BPMS. The main components of the BPMS solution framework are process definition repository, process instances repository, transaction manager, conectors framework, process engine and middleware. In this paper we define and characterize the role and importance of the components of BPMS's framework. The research method adopted was the case study, through the analysis of the implementation of the BPMS solution in an insurance company called Chubb do Brasil. In the case study, the process "Manage Coinsured Events"" is described and characterized, as well as the components of the BPMS solution adopted and implemented by Chubb do Brasil for managing this process.

  20. Superconductor-normal metal-superconductor process development for the fabrication of small Josephson junctions in ramp type configuration

    International Nuclear Information System (INIS)

    Poepel, R.; Hagedorn, D.; Weimann, T.; Buchholz, F.-I.; Niemeyer, J.

    2000-01-01

    At PTB, a fabrication process has been developed in SNS Nb/PdAu/Nb technology for the verification of small Josephson junctions (JJs) in the deep sub-micron range to enable the implementation of JJs as active elements in highly integrated superconducting circuits. Two steps of this technological development are described with regard to appropriately designed circuit layouts of JJ series arrays (JJAs), the first one in a conventional window type junction (WTJ) configuration and the second one in a ramp type junction (RTJ) configuration. Test circuits of JJAs containing up to 10 000 JJs have been fabricated and experimentally tested. In WTJ configuration, the circuits proved to be sensitive to external perturbing effects affecting the stability of circuit operation. In contrast to that, in RTJ configuration, the circuits realized showed correct function and a high grade of reliability of operation. To produce RTJ circuits, the technology parameters have been set to realize JJs with contact areas of A=0.25μmx1.3μm. At a thickness of the PdAu normal metal layer of d = 40 nm, the values achieved for the critical current density and for the product of critical current and normal state resistance are about j c = 200 k Acm -2 and about I c R N = 21 μV. (author)

  1. A user configurable data acquisition and signal processing system for high-rate, high channel count applications

    International Nuclear Information System (INIS)

    Salim, Arwa; Crockett, Louise; McLean, John; Milne, Peter

    2012-01-01

    Highlights: ► The development of a new digital signal processing platform is described. ► The system will allow users to configure the real-time signal processing through software routines. ► The architecture of the DRUID system and signal processing elements is described. ► A prototype of the DRUID system has been developed for the digital chopper-integrator. ► The results of acquisition on 96 channels at 500 kSamples/s per channel are presented. - Abstract: Real-time signal processing in plasma fusion experiments is required for control and for data reduction as plasma pulse times grow longer. The development time and cost for these high-rate, multichannel signal processing systems can be significant. This paper proposes a new digital signal processing (DSP) platform for the data acquisition system that will allow users to easily customize real-time signal processing systems to meet their individual requirements. The D-TACQ reconfigurable user in-line DSP (DRUID) system carries out the signal processing tasks in hardware co-processors (CPs) implemented in an FPGA, with an embedded microprocessor (μP) for control. In the fully developed platform, users will be able to choose co-processors from a library and configure programmable parameters through the μP to meet their requirements. The DRUID system is implemented on a Spartan 6 FPGA, on the new rear transition module (RTM-T), a field upgrade to existing D-TACQ digitizers. As proof of concept, a multiply-accumulate (MAC) co-processor has been developed, which can be configured as a digital chopper-integrator for long pulse magnetic fusion devices. The DRUID platform allows users to set options for the integrator, such as the number of masking samples. Results from the digital integrator are presented for a data acquisition system with 96 channels simultaneously acquiring data at 500 kSamples/s per channel.

  2. Disposal criticality analysis for the ceramic waste form from the ANL electrometallurgical treatment process - Internal configurations

    International Nuclear Information System (INIS)

    Lell, R. M.; Agrawal, R.; Morris, E. E.

    2000-01-01

    Criticality safety issues for disposal of the ANL ceramic waste were examined for configurations within the waste package. Co-disposal of ceramic waste and DOE spent fuel is discussed briefly; co-disposal of ANL ceramic and metal wastes is examined in detail. Calculations indicate that no significant potential for criticality exists until essentially all of the important neutron absorbers are flushed from the degraded ceramic waste. Even if all of the neutron absorbers are removed from the ceramic waste rubble, the package remains far subcritical if the blended salts used in ceramic waste production have an initial U-235 enrichment below 40%

  3. Information management in process planning

    NARCIS (Netherlands)

    Lutters, Diederick; Wijnker, T.C.; Kals, H.J.J.

    1999-01-01

    A recently proposed reference model indicates the use of structured information as the basis for the control of design and manufacturing processes. The model is used as a basis to describe the integration of design and process planning. A differentiation is made between macro- and micro process

  4. BUSINESS PROCESS REENGINEERING AS THE METHOD OF PROCESS MANAGEMENT

    Directory of Open Access Journals (Sweden)

    O. Honcharova

    2013-09-01

    Full Text Available The article is devoted to the analysis of process management approach. The main understanding of process management approach has been researched in the article. The definition of process and process management has been given. Also the methods of business process improvement has been analyzed, among them are fast-analysis solution technology (FAST, benchmarking, reprojecting and reengineering. The main results of using business process improvement have been described in figures of reducing cycle time, costs and errors. Also the tasks of business process reengineering have been noticed. The main stages of business process reengineering have been noticed. The main efficiency results of business process reengineering and its success factors have been determined.

  5. Graphical User Interface Development and Design to Support Airport Runway Configuration Management

    Science.gov (United States)

    Jones, Debra G.; Lenox, Michelle; Onal, Emrah; Latorella, Kara A.; Lohr, Gary W.; Le Vie, Lisa

    2015-01-01

    The objective of this effort was to develop a graphical user interface (GUI) for the National Aeronautics and Space Administration's (NASA) System Oriented Runway Management (SORM) decision support tool to support runway management. This tool is expected to be used by traffic flow managers and supervisors in the Airport Traffic Control Tower (ATCT) and Terminal Radar Approach Control (TRACON) facilities.

  6. Strategic management process in hospitals.

    Science.gov (United States)

    Zovko, V

    2001-01-01

    Strategic management is concerned with strategic choices and strategic implementation; it provides the means by which organizations meet their objectives. In the case of hospitals it helps executives and all employees to understand the real purpose and long term goals of the hospital. Also, it helps the hospital find its place in the health care service provision chain, and enables the hospital to coordinate its activities with other organizations in the health care system. Strategic management is a tool, rather than a solution, that helps executives to identify root causes of major problems in the hospital.

  7. Dynamic configuration management of a multi-standard and multi-mode reconfigurable multi-ASIP architecture for turbo decoding

    Science.gov (United States)

    Lapotre, Vianney; Gogniat, Guy; Baghdadi, Amer; Diguet, Jean-Philippe

    2017-12-01

    The multiplication of connected devices goes along with a large variety of applications and traffic types needing diverse requirements. Accompanying this connectivity evolution, the last years have seen considerable evolutions of wireless communication standards in the domain of mobile telephone networks, local/wide wireless area networks, and Digital Video Broadcasting (DVB). In this context, intensive research has been conducted to provide flexible turbo decoder targeting high throughput, multi-mode, multi-standard, and power consumption efficiency. However, flexible turbo decoder implementations have not often considered dynamic reconfiguration issues in this context that requires high speed configuration switching. Starting from this assessment, this paper proposes the first solution that allows frame-by-frame run-time configuration management of a multi-processor turbo decoder without compromising the decoding performances.

  8. The process approach to service quality management

    OpenAIRE

    Kamila Kowalik; Dorota Klimecka-Tatar

    2018-01-01

    In this paper a model of service quality management based on the process approach has been presented. The first part of the article contains the theoretical framework of service quality and the process approach in management. Next, quality of service process has been presented in reference to a process-based definition in quoted literature. Finally, the outcomes of a customer questionnaire concerning the validity of particular quality attributes has been presented. The collected data in relat...

  9. Managing the training process in bodybuilding

    OpenAIRE

    Netík, Tomáš

    2011-01-01

    Anotation Title: Managing the training process in bodybuilding This thesis describes the sport of bodybuilding and its training process. It also describes aspects of managing the training process and based on own research determines what impact the training process is applied to changes in the state of training and performance. There is also considering the impact of specific training methods and intensification. In the research of this thesis, we used different testing methods. We performed ...

  10. Configurable Web Warehouses construction through BPM Systems

    Directory of Open Access Journals (Sweden)

    Andrea Delgado

    2016-08-01

    Full Text Available The process of building Data Warehouses (DW is well known with well defined stages but at the same time, mostly carried out manually by IT people in conjunction with business people. Web Warehouses (WW are DW whose data sources are taken from the web. We define a flexible WW, which can be configured accordingly to different domains, through the selection of the web sources and the definition of data processing characteristics. A Business Process Management (BPM System allows modeling and executing Business Processes (BPs providing support for the automation of processes. To support the process of building flexible WW we propose a two BPs level: a configuration process to support the selection of web sources and the definition of schemas and mappings, and a feeding process which takes the defined configuration and loads the data into the WW. In this paper we present a proof of concept of both processes, with focus on the configuration process and the defined data.

  11. Improving configuration management of thermalhydraulic analysis by automating the linkage between pipe geometry and plant idealization

    International Nuclear Information System (INIS)

    Gibb, R.; Girard, R.; Thompson, W.

    1997-01-01

    All safety analysis codes require some representation of actual plant data as a part of their input. Such representations, referred to at Point Lepreau Generating Station (PLGS) as plant idealizations, may include piping layout, orifice, pump or valve opening characteristics, boundary conditions of various sorts, reactor physics parameters, etc. As computing power increases, the numerical capabilities of thermalhydraulic analysis tools become more sophisticated, requiring more detailed assessments, and consequently more complex and complicated idealizations of the system models. Thus, a need has emerged to create a precise plant model layout in electronic form which ensures a realistic representation of the plant systems, and form which analytical approximations of any chosen degree of accuracy may be created. The benefits of this process are twofold. Firstly, the job of developing a plant idealization is made simpler, and therefore is cheaper for the utility. More important however, are the improvements in documentation and reproducibility that this process imparts to the resultant idealization. Just as the software that performs the numerical operations on the input data must be subject to verification/validation, equally robust measures must be taken to ensure that these software operations are being applied to valid idealizations, that are formally documented. Since the CATHENA Code is one of the most important thermalhydraulic code used for safety analysis at PLGS the main effort was directed towards the systems plant models for this code. This paper reports the results of the work carried on at PLGS and ANSL to link the existing piping data base to the actual CATHENA plant idealization. An introduction to the concept is given first, followed by a description of the databases, and the supervisory tool which manages the data, and associated software. An intermediate code, which applied some thermalhydraulic rules to the data, and translated the resultant data

  12. Technologies for Collaborative Business Process Management

    NARCIS (Netherlands)

    Sadiq, Shazia; Reichert, M.U.; Schulz, Karsten

    Business process management (BPM) has become an extensive area of research with several specialized aspects. BPM is viewed from highly diverse angles ranging from a management strategy to a software system. It is widely acknowledged that process enforcement technologies hold the potential to provide

  13. Photoacoustic and spectroscopic characterization of the ablation process in orthogonal double-pulse configuration

    International Nuclear Information System (INIS)

    Sobral, H; Sanchez-Ake, C; Sangines, R; Alvarez-Zauco, E; Jimenez-Duran, K

    2011-01-01

    A photoacoustic technique was used as an alternative method to monitor the crater volume and its role in the emission line intensification in double-pulse pre-ablation configuration. The crater volume was measured using confocal microscopy and correlated with the changes in the photoacoustic signal. Laser emission spectroscopy was used to characterize the emission enhancement as a function of the delay between lasers and the first pulse energy. Optimum delay was found to be in the microsecond timescale corresponding to the maximum of the crater volume and the largest change between the single- and the double-pulse photoacoustic signals. Only a slight intensification was detected with increasing first pulse energy above the first pulse ablation threshold; however, the crater volume did not significantly change and the possible involved mechanisms are discussed.

  14. Risk-oriented management of system configurations during power plant operation

    International Nuclear Information System (INIS)

    Kafka, P.

    1991-01-01

    The paper explains the purpose, design, and functions of an on-line database called risk monitor, which is developed on the basis of a risk model mapping an entire plant and the functions of the system configurations by a probabilistic and risk-oriented approach in a computerized simulation model. The frequency of occurrence of the various failure modes is computed and specified by fault tree analysis and event tree analysis. The monitoring system is a diagnostic tool for power plant operators. (DG) [de

  15. Career management: understanding the process.

    Science.gov (United States)

    Mackowiak, J; Eckel, F M

    1985-02-01

    This article is the first of a three-part series on career management for hospital pharmacists. Work attitudes, life cycles, needs, and career trends are discussed. Three basic work attitudes exist. Some see work as punishment. Others believe work in itself is good, i.e., they have a strong work ethic. Some view work as a means to satisfy, at least partially, a range of needs. Attitudinal transition points are likely to occur at specific times in the adult life cycle. The stages of the life cycle can be labeled as leaving, reaching out, questioning, midlife crisis, settling down, and mellowing. A progression through each of these stages is required for normal adult psychological development. Every individual exhibits a blend of needs that changes throughout life. Jobs can fulfill existence, relatedness, and growth needs. Relatedness needs include the need for love, affiliation, social esteem, and power, and growth needs include the need for self-esteem, competence, achievement, and autonomy. Three important career trends are the changing opportunities for advancement, women in careers, and dual-career couples. The number of women pharmacists is increasing as is the number of two-career couples. Tips for managing two-career relationships are presented. Pharmacists can manage their careers more effectively by understanding their needs, identifying their basic attitude toward work, and being aware of the trends occurring in pharmacy.

  16. Process management using component thermal-hydraulic function classes

    Science.gov (United States)

    Morman, J.A.; Wei, T.Y.C.; Reifman, J.

    1999-07-27

    A process management expert system where following malfunctioning of a component, such as a pump, for determining system realignment procedures such as for by-passing the malfunctioning component with on-line speeds to maintain operation of the process at full or partial capacity or to provide safe shut down of the system while isolating the malfunctioning component. The expert system uses thermal-hydraulic function classes at the component level for analyzing unanticipated as well as anticipated component malfunctions to provide recommended sequences of operator actions. Each component is classified according to its thermal-hydraulic function, and the generic and component-specific characteristics for that function. Using the diagnosis of the malfunctioning component and its thermal hydraulic class, the expert system analysis is carried out using generic thermal-hydraulic first principles. One aspect of the invention employs a qualitative physics-based forward search directed primarily downstream from the malfunctioning component in combination with a subsequent backward search directed primarily upstream from the serviced component. Generic classes of components are defined in the knowledge base according to the three thermal-hydraulic functions of mass, momentum and energy transfer and are used to determine possible realignment of component configurations in response to thermal-hydraulic function imbalance caused by the malfunctioning component. Each realignment to a new configuration produces the accompanying sequence of recommended operator actions. All possible new configurations are examined and a prioritized list of acceptable solutions is produced. 5 figs.

  17. Process management using component thermal-hydraulic function classes

    Science.gov (United States)

    Morman, James A.; Wei, Thomas Y. C.; Reifman, Jaques

    1999-01-01

    A process management expert system where following malfunctioning of a component, such as a pump, for determining system realignment procedures such as for by-passing the malfunctioning component with on-line speeds to maintain operation of the process at full or partial capacity or to provide safe shut down of the system while isolating the malfunctioning component. The expert system uses thermal-hydraulic function classes at the component level for analyzing unanticipated as well as anticipated component malfunctions to provide recommended sequences of operator actions. Each component is classified according to its thermal-hydraulic function, and the generic and component-specific characteristics for that function. Using the diagnosis of the malfunctioning component and its thermal hydraulic class, the expert system analysis is carried out using generic thermal-hydraulic first principles. One aspect of the invention employs a qualitative physics-based forward search directed primarily downstream from the malfunctioning component in combination with a subsequent backward search directed primarily upstream from the serviced component. Generic classes of components are defined in the knowledge base according to the three thermal-hydraulic functions of mass, momentum and energy transfer and are used to determine possible realignment of component configurations in response to thermal-hydraulic function imbalance caused by the malfunctioning component. Each realignment to a new configuration produces the accompanying sequence of recommended operator actions. All possible new configurations are examined and a prioritized list of acceptable solutions is produced.

  18. Power Management Strategy by Enhancing the Mission Profile Configuration of Solar-Powered Aircraft

    Directory of Open Access Journals (Sweden)

    Parvathy Rajendran

    2016-01-01

    Full Text Available Solar energy offers solar-powered unmanned aerial vehicle (UAV the possibility of unlimited endurance. Some researchers have developed techniques to achieve perpetual flight by maximizing the power from the sun and by flying in accordance with its azimuth angles. However, flying in a path that follows the sun consumes more energy to sustain level flight. This study optimizes the overall power ratio by adopting the mission profile configuration of optimal solar energy exploitation. Extensive simulation is conducted to optimize and restructure the mission profile phases of UAV and to determine the optimal phase definition of the start, ascent, and descent periods, thereby maximizing the energy from the sun. In addition, a vertical cylindrical flight trajectory instead of maximizing the solar inclination angle has been adopted. This approach improves the net power ratio by 30.84% compared with other techniques. As a result, the battery weight may be massively reduced by 75.23%. In conclusion, the proposed mission profile configuration with the optimal power ratio of the trajectory of the path planning effectively prolongs UAV operation.

  19. Control of a Biological Nitrogen Removal Process in an Intensified Single Reactor Configuration

    DEFF Research Database (Denmark)

    Vangsgaard, Anna Katrine; Mauricio Iglesias, Miguel; Gernaey, Krist

    2013-01-01

    The nitrogen removing granular sludge process is a novel and intensified process. However, its stable operation and control remains a challenging problem. In this contribution, a new process oriented approach is used to develop, evaluate and benchmark control strategies to ensure stable operation...

  20. A Process Management System for Networked Manufacturing

    Science.gov (United States)

    Liu, Tingting; Wang, Huifen; Liu, Linyan

    With the development of computer, communication and network, networked manufacturing has become one of the main manufacturing paradigms in the 21st century. Under the networked manufacturing environment, there exist a large number of cooperative tasks susceptible to alterations, conflicts caused by resources and problems of cost and quality. This increases the complexity of administration. Process management is a technology used to design, enact, control, and analyze networked manufacturing processes. It supports efficient execution, effective management, conflict resolution, cost containment and quality control. In this paper we propose an integrated process management system for networked manufacturing. Requirements of process management are analyzed and architecture of the system is presented. And a process model considering process cost and quality is developed. Finally a case study is provided to explain how the system runs efficiently.

  1. Method for Business Process Management System Selection

    OpenAIRE

    Westelaken, van de, Thijs; Terwee, Bas; Ravesteijn, Pascal

    2013-01-01

    In recent years business process management (BPM) and specifically information systems that support the analysis, design and execution of processes (also called business process management systems (BPMS)) are getting more attention. This has lead to an increase in research on BPM and BPMS. However the research on BPMS is mostly focused on the architecture of the system and how to implement such systems. How to select a BPM system that fits the strategy and goals of a specific organization is ...

  2. THE ANALYSIS OF RISK MANAGEMENT PROCESS WITHIN MANAGEMENT

    Directory of Open Access Journals (Sweden)

    ROMANESCU MARCEL LAURENTIU

    2016-10-01

    Full Text Available This article highlights the risk analysis within management, focusing on how a company could practicaly integrate the risks management in the existing leading process. Subsequently, it is exemplified the way of manage risk effectively, which gives numerous advantages to all firms, including improving their decision-making process. All these lead to the conclusion that the degree of risk specific to companies is very high, but if managers make the best decisions then it can diminish it and all business activitiy and its income are not influenced by factors that could disturb in a negative way .

  3. Engineering Analysis of Intermediate Loop and Process Heat Exchanger Requirements to Include Configuration Analysis and Materials Needs

    Energy Technology Data Exchange (ETDEWEB)

    T.M. Lillo; R.L. Williamson; T.R. Reed; C.B. Davis; D.M. Ginosar

    2005-09-01

    The need to locate advanced hydrogen production facilities a finite distance away from a nuclear power source necessitates the need for an intermediate heat transport loop (IHTL). This IHTL must not only efficiently transport energy over distances up to 500 meters but must also be capable of operating at high temperatures (>850oC) for many years. High temperature, long term operation raises concerns of material strength, creep resistance and general material stability (corrosion resistance). IHTL design is currently in the initial stages. Many questions remain to be answered before intelligent design can begin. The report begins to look at some of the issues surrounding the main components of an IHTL. Specifically, a stress analysis of a compact heat exchanger design under expected operating conditions is reported. Also the results of a thermal analysis performed on two ITHL pipe configurations for different heat transport fluids are presented. The configurations consist of separate hot supply and cold return legs as well as annular design in which the hot fluid is carried in an inner pipe and the cold return fluids travels in the opposite direction in the annular space around the hot pipe. The effects of insulation configurations on pipe configuration performance are also reported. Finally, a simple analysis of two different process heat exchanger designs, one a tube in shell type and the other a compact or microchannel reactor are evaluated in light of catalyst requirements. Important insights into the critical areas of research and development are gained from these analyses, guiding the direction of future areas of research.

  4. Process Management Practices In Healthcare Institutions

    Directory of Open Access Journals (Sweden)

    Şükrü Kılıç

    2015-09-01

    Full Text Available Healthcare institutions differ from other service businesses by their “matrix organizational structure” and “error-free output” requirement. However, the processes stay the same for all organizational activities at different levels. One of the post-modern management approach is to focus on basis of necessary processes and fundamental organizational changes. This case study aims to initially explain the characteristics of healthcare institutions and the basic conceptual properties of process and process management. Then the effect of the “management throughprocesses approach” over organization will be discussed. Finally; process management at healthcare institutions, scope of health care and examples of the other post-modern approaches will be examined with their outputs

  5. Learning while (re-)configuring: business model innovation processes in established firms

    NARCIS (Netherlands)

    Berends, J.J.; Smits, A.; Reymen, I.M.M.J.; Podoynitsyna, K.S.

    2016-01-01

    This study addresses the question of how established organizations develop new business models over time, using a process research approach to trace how four business model innovation trajectories unfold. With organizational learning as analytical lens, we discern two process patterns: “drifting”

  6. The H-Oil Process : Preferred configurations for application to western Canadian feedstocks

    International Nuclear Information System (INIS)

    Colyar, J.J.; Peer, E.D.

    1997-01-01

    The technical and economic evaluation of a method used to convert and upgrade petroleum residua and heavy oils into lighter products was described. The feasibility of applying the process to typical western Canadian oil sand feedstocks was evaluated. The H-Oil process, developed by HRI Inc., is an ebullated-bed catalytic hydrocracking process that accounts for more than 50 per cent of the worldwide vacuum residue hydroprocessing market. It has a unique flexibility to handle many different types of heavy crudes while producing clean transportation fuels. The unconverted vacuum residue from the process can be used for fuel oil production, blended into asphalt, or routed to a resid catalytic cracker or coker. The residue can also be directly combusted or gasified to produce hydrogen. Four different technologies that have been used commercially in Canada to upgrade western Canadian heavy oil residue have been reviewed and evaluated from a technical and economic viewpoint. The following improvements in the H-oil process have resulted in greater economy and product quality: (1) development of a new generation of high activity catalysts, (2) development of an improved recycle cup, and (3) new outlets for unconverted residue. It was suggested that the H-Oil process produces more revenue than the delayed coker process. As coke becomes harder to dispose of, the H-Oil process will become more attractive for producing synthetic crude from heavy oil. 6 refs., 9 tabs., 9 figs

  7. Relational XES: Data management for process mining

    NARCIS (Netherlands)

    Dongen, van B.F.; Shabani, S.; Grabis, J.; Sandkuhl, K.

    2015-01-01

    Information systems log data during the execution of business processes in so called "event logs". Process mining aims to improve business processes by extracting knowledge from event logs. Currently, the de-facto standard for storing and managing event data, XES, is tailored towards sequential

  8. Relational XES : data management for process mining

    NARCIS (Netherlands)

    Dongen, van B.F.; Shabani, S.

    2015-01-01

    Information systems log data during the execution of business processes in so called "event logs". Process mining aims to improve business processes by extracting knowledge from event logs. Currently, the de-facto standard for storing and managing event data, XES, is tailored towards sequential

  9. Numerical modeling of optical coherent transient processes with complex configurations-III: Noisy laser source

    International Nuclear Information System (INIS)

    Chang Tiejun; Tian Mingzhen

    2007-01-01

    A previously developed numerical model based on Maxwell-Bloch equations was modified to simulate optical coherent transient and spectral hole burning processes with noisy laser sources. Random walk phase noise was simulated using laser-phase sequences generated numerically according to the normal distribution of the phase shift. The noise model was tested by comparing the simulated spectral hole burning effect with the analytical solution. The noise effects on a few typical optical coherence transient processes were investigated using this numerical tool. Flicker and random walk frequency noises were considered in accumulation process

  10. The Needs of Hybrid Systems Configuration for Real - Time Decision - Making Process in Surgery

    National Research Council Canada - National Science Library

    Tritto, G

    2001-01-01

    ...: sensors, actuators, mechatronic systems and tools in Minimally Invasive Surgery (MIS) and Microsurgery require nonlinear interpretation and control systems to interface with the computer-assisted decision making process of the surgeon at work...

  11. Integrating Process Management with Archival Management Systems: Lessons Learned

    Directory of Open Access Journals (Sweden)

    J. Gordon Daines, III

    2009-03-01

    Full Text Available The Integrated Digital Special Collections (INDI system is a prototype of a database-driven, Web application designed to automate and manage archival workflow for large institutions and consortia. This article discusses the how the INDI project enabled the successful implementation of a process to manage large technology projects in the Harold B. Lee Library at Brigham Young University. It highlights how the scope of these technology projects is set and how the major deliverables for each project are defined. The article also talks about how the INDI system followed the process and still failed to be completed. It examines why the process itself is successful and why the INDI project failed. It further underscores the importance of process management in archival management systems.

  12. Numerical modeling of optical coherent transient processes with complex configurations - II. Angled beams with arbitrary phase modulations

    International Nuclear Information System (INIS)

    Chang Tiejun; Tian Mingzhen; Barber, Zeb W.; Randall Babbitt, Wm.

    2004-01-01

    This work is a continuation of the development of the theoretical model for optical coherent transient (OCT) processes with complex configurations. A theoretical model for angled beams with arbitrary phase modulation has been developed based on the model presented in our previous work for the angled beam geometry. A numerical tool has been devised to simulate the OCT processes involving angled beams with the frequency detuning, chirped, and phase-modulated laser pulses. The simulations for pulse shaping and arbitrary waveform generation (AWG) using OCT processes have been performed. The theoretical analysis of programming and probe schemes for pulse shaper and AWG is also presented including the discussions on the rephasing condition and the phase compensation. The results from the analysis, the simulation, and the experiment show very good agreement

  13. Track 6: safety and risk management. Plant operational risk management. Plant Configuration Risk Assessment Methodology Development for Periodic Maintenance

    International Nuclear Information System (INIS)

    Yang, Huichang; Chung, Chang Hyun; Sung, Key Yong

    2001-01-01

    As the operation experiences of nuclear power plants (NPPs) in Korea accumulate and NPP safety functions become enhanced, the role of stable and optimal NPP operation within acceptable safety criteria becomes important at present. To accomplish the goal of safe and optimal operation, maintenance and its related activities should be regarded as the issues of most concern. Studies of methodologies for maintenance improvement and optimization have focused on system performance rather than on the hardware itself. From this point of view, the probabilistic methods are most useful. In terms of risk including core damage frequency and unavailability, the cause that might impact plant safety during normal maintenance activities can be identified and evaluated effectively. The results from these probabilistic analyses can provide insightful information for the reallocation of risk-contributing maintenance activity. This information can be utilized in a way that separates the significant risk-contributing maintenance activities from each other unless they are timely related. In Korea, the risk-monitoring program for operating NPPs is under development and will be implemented in 2003. To accomplish the risk-monitoring program objectives, suitable risk evaluation methods should be developed before the implementation of the risk-monitoring program. The plant configuration assessment methodology was developed for these reasons, and this method is to incorporate the field experiences into the risk calculation exactly within the limit of probabilistic methods. During normal plant operation, the plant operational risk changes frequently depending on the status of the plant system and the arrangement of the components. Specific plant systems or components are typically removed from service because of random equipment failure, planned preventive/predictive maintenance, corrective maintenance, surveillance testing, and operational bypass activities, and such events usually impact the

  14. Socialization as key process in knowledge management

    Directory of Open Access Journals (Sweden)

    Francisco José GARCÍA-PEÑALVO

    2016-07-01

    Full Text Available The editorial of this second issue of volume 17,corresponding to 2016, is devoted to socialization process in the knowledge management in order to complement the special section about Social Networks and Education.

  15. Crew Transportation Technical Management Processes

    Science.gov (United States)

    Mckinnie, John M. (Compiler); Lueders, Kathryn L. (Compiler)

    2013-01-01

    Under the guidance of processes provided by Crew Transportation Plan (CCT-PLN-1100), this document, with its sister documents, International Space Station (ISS) Crew Transportation and Services Requirements Document (CCT-REQ-1130), Crew Transportation Technical Standards and Design Evaluation Criteria (CCT-STD-1140), Crew Transportation Operations Standards (CCT STD-1150), and ISS to Commercial Orbital Transportation Services Interface Requirements Document (SSP 50808), provides the basis for a National Aeronautics and Space Administration (NASA) certification for services to the ISS for the Commercial Provider. When NASA Crew Transportation System (CTS) certification is achieved for ISS transportation, the Commercial Provider will be eligible to provide services to and from the ISS during the services phase.

  16. Investigating road safety management processes in Europe.

    NARCIS (Netherlands)

    Jähi, H. Muhlrad, N. Buttler, I. Gitelman, V. Bax, C. Dupont, E. Giustiniani, G. Machata, K. Martensen, H. Papadimitriou, E. Persia, L. Talbot, R. Vallet, G. & Yannis, G.

    2012-01-01

    The work package 1 of the EC FP7 project DaCoTA investigates road safety management processes in Europe. It has drafted a model to investigate the state of the art of road safety policy-making and management at the national level and to define “good practice”. The DaCoTA “good practice”

  17. Building an Identity Management Governance Process

    Science.gov (United States)

    Berg, Joanne E.; Kraemer, Ron; Raatz, Carla; Devoti, Steve

    2009-01-01

    A particular challenge in any campus environment is determining how requests for access to services and resources are managed. Who decides the technology, infrastructure, policy, business process and procedure? The involvement of key institutional leaders and stakeholders in identity management governance is the driving force behind the way the…

  18. The Management-Business Process: Cultural Considerations.

    Science.gov (United States)

    Ruiz, Reynaldo

    The effect of culture on the business management process in a Hispanic setting is explored for the benefit of persons in business in Latin America or with Hispanic groups in the United States. Understanding of cultural differences is important for business managers who work with Spanish speaking employees or clients because of the wide-ranging and…

  19. Assessment of Navy Contract Management Processes

    Science.gov (United States)

    2016-04-30

    capability? • 85% of quality problems are related to processes, while only 15% of problems are controlled by individual workers ( Deming , 1986...eligible participants: 369 • Total surveys completed: 185 • Response rate: 50% CONTRACT MANAGEMENT MATURITY MODEL© MATURITY LEVEL 5...Measurement – Organizations systematically use performance metrics to measure the quality and evaluate the effectiveness of the contract management

  20. Using Intelligent Agents to Manage Business Processes

    OpenAIRE

    Jennings, N. R.; Faratin, P.; Johnson, M. J.; O'Brien, P.; Wiegand, M. E.

    1996-01-01

    Management of the business process requires pertinent, consistent and up-to-date information gathering and information dissemination. These complex and time consuming tasks prompt organizations to develop an Information Technology system to assist with the management of various aspects of their business processes. Intelligent agents are the strongest solution candidates because of their many advantages, namely: autonomy, social ability, responsiveness and proactiveness. Given these characteri...

  1. Computer software configuration management plan for the Honeywell modular automation system

    International Nuclear Information System (INIS)

    Cunningham, L.T.

    1997-01-01

    This document provides a Computer Software management plan for a new Honeywell Modular Automation System (MAS) being installed in the Plutonium Finishing Plant (PFP). This type of system will be used to control new thermal stabilization furnaces, a vertical denitrator calciner, and a pyrolysis furnace

  2. Technological transitions as evolutionary configuration processes: A multi-level perspective and a case-study

    NARCIS (Netherlands)

    Geels, F.W.

    2002-01-01

    This paper addresses the question of how technological transitions (TT) come about? Are there particular patterns and mechanisms in transition processes? TT are defined as major, long-term technological changes in the way societal functions are fulfilled. TT do not only involve changes in

  3. Featural versus configural face processing in a rare genetic disorder: Williams syndrome

    NARCIS (Netherlands)

    Isaac, L.; Lincoln, A.

    2011-01-01

    Background Williams syndrome (WMS) is a rare genetic disorder with an estimated prevalence of 1 in 20 000 live births. Among other characteristics, WMS has a distinctive cognitive profile with spared face processing and language skills that contrasts with impairment in the cognitive domains of

  4. Improvement of Construction Project Management Processes

    Directory of Open Access Journals (Sweden)

    Nazarko, J.

    2017-07-01

    Full Text Available The common denominator of the five papers published in the current edition of the Journal of Engineering, Project, and Production Management is the improvement of construction project management processes for effective use of resources. Execution of proper project management processes is widely recognized as a key success factor influencing likelihood of project success (Alleman, 2014. It is noticeable that four out of five papers in this issue of the Journal are authored or co-authored by Iranian researchers from the same Institute but their conclusions bear importance that cannot be limited to the authors’ region.

  5. Learning while (re)configuring: Business model innovation processes in established firms

    Science.gov (United States)

    Berends, Hans; Smits, Armand; Reymen, Isabelle; Podoynitsyna, Ksenia

    2016-01-01

    This study addresses the question of how established organizations develop new business models over time, using a process research approach to trace how four business model innovation trajectories unfold. With organizational learning as analytical lens, we discern two process patterns: “drifting” starts with an emphasis on experiential learning and shifts later to cognitive search; “leaping,” in contrast, starts with an emphasis on cognitive search and shifts later to experiential learning. Both drifting and leaping can result in radical business model innovations, while their occurrence depends on whether a new business model takes off from an existing model and when it goes into operation. We discuss the implications of these findings for theory on business models and organizational learning. PMID:28596704

  6. Process configuration of Liquid-nitrogen Energy Storage System (LESS) for maximum turnaround efficiency

    Science.gov (United States)

    Dutta, Rohan; Ghosh, Parthasarathi; Chowdhury, Kanchan

    2017-12-01

    Diverse power generation sector requires energy storage due to penetration of variable renewable energy sources and use of CO2 capture plants with fossil fuel based power plants. Cryogenic energy storage being large-scale, decoupled system with capability of producing large power in the range of MWs is one of the options. The drawback of these systems is low turnaround efficiencies due to liquefaction processes being highly energy intensive. In this paper, the scopes of improving the turnaround efficiency of such a plant based on liquid Nitrogen were identified and some of them were addressed. A method using multiple stages of reheat and expansion was proposed for improved turnaround efficiency from 22% to 47% using four such stages in the cycle. The novelty here is the application of reheating in a cryogenic system and utilization of waste heat for that purpose. Based on the study, process conditions for a laboratory-scale setup were determined and presented here.

  7. Learning while (re)configuring: Business model innovation processes in established firms.

    Science.gov (United States)

    Berends, Hans; Smits, Armand; Reymen, Isabelle; Podoynitsyna, Ksenia

    2016-08-01

    This study addresses the question of how established organizations develop new business models over time, using a process research approach to trace how four business model innovation trajectories unfold. With organizational learning as analytical lens, we discern two process patterns: "drifting" starts with an emphasis on experiential learning and shifts later to cognitive search; "leaping," in contrast, starts with an emphasis on cognitive search and shifts later to experiential learning. Both drifting and leaping can result in radical business model innovations, while their occurrence depends on whether a new business model takes off from an existing model and when it goes into operation. We discuss the implications of these findings for theory on business models and organizational learning.

  8. Numerical modeling of optical coherent transient processes with complex configurations - I. Angled beam geometry

    International Nuclear Information System (INIS)

    Chang Tiejun; Tian Mingzhen; Randall Babbitt, Wm.

    2004-01-01

    We present a theoretical model for optical coherent transient (OCT) processes based on Maxwell-Bloch equations for angled beam geometry. This geometry is critical in various OCT applications where the desired coherence outputs need to be spatially separated from the rest of the field. The model takes into account both the local interactions between inhomogeneously broadened two-level atoms and the laser fields, and the field propagation in optically thick media. Under the small-angle condition, the spatial dimensions transversing to the main propagation direction were treated with spatial Fourier transform to make the numerical computations for the practical settings confined within a reasonable time frame. The simulations for analog correlators and continuous processing based on stimulated photon echo have been performed using the simulator developed using the theory

  9. From Project Management to Process Management - Effectively Organising Transdisciplinary Projects

    OpenAIRE

    Moschitz, Heidrun

    2013-01-01

    In transdisciplinary projects, the roles of researchers change. In addition to being a source of knowledge, they are required to engage in knowledge exchange processes. This results in an alteration at project level: researchers need to creatively manage projects as group processes.

  10. Implementing process safety management in gas processing operations

    International Nuclear Information System (INIS)

    Rodman, D.L.

    1992-01-01

    The Occupational Safety and Health Administration (OSHA) standard entitled Process Safety Management of Highly Hazardous Chemicals; Explosives and Blasting Agents was finalized February 24, 1992. The purpose of the standard is to prevent or minimize consequences of catastrophic releases of toxic, flammable, or explosive chemicals. OSHA believes that its rule will accomplish this goal by requiring a comprehensive management program that integrates technologies, procedures, and management practices. Gas Processors Association (GPA) member companies are significantly impacted by this major standard, the requirements of which are extensive and complex. The purpose of this paper is to review the requirements of the standard and to discuss the elements to consider in developing and implementing a viable long term Process Safety Management Program

  11. Operational Dynamic Configuration Analysis

    Science.gov (United States)

    Lai, Chok Fung; Zelinski, Shannon

    2010-01-01

    Sectors may combine or split within areas of specialization in response to changing traffic patterns. This method of managing capacity and controller workload could be made more flexible by dynamically modifying sector boundaries. Much work has been done on methods for dynamically creating new sector boundaries [1-5]. Many assessments of dynamic configuration methods assume the current day baseline configuration remains fixed [6-7]. A challenging question is how to select a dynamic configuration baseline to assess potential benefits of proposed dynamic configuration concepts. Bloem used operational sector reconfigurations as a baseline [8]. The main difficulty is that operational reconfiguration data is noisy. Reconfigurations often occur frequently to accommodate staff training or breaks, or to complete a more complicated reconfiguration through a rapid sequence of simpler reconfigurations. Gupta quantified a few aspects of airspace boundary changes from this data [9]. Most of these metrics are unique to sector combining operations and not applicable to more flexible dynamic configuration concepts. To better understand what sort of reconfigurations are acceptable or beneficial, more configuration change metrics should be developed and their distribution in current practice should be computed. This paper proposes a method to select a simple sequence of configurations among operational configurations to serve as a dynamic configuration baseline for future dynamic configuration concept assessments. New configuration change metrics are applied to the operational data to establish current day thresholds for these metrics. These thresholds are then corroborated, refined, or dismissed based on airspace practitioner feedback. The dynamic configuration baseline selection method uses a k-means clustering algorithm to select the sequence of configurations and trigger times from a given day of operational sector combination data. The clustering algorithm selects a simplified

  12. Hanford Tanks Initiative requirements and document management process guide

    International Nuclear Information System (INIS)

    Schaus, P.S.

    1998-01-01

    This revision of the guide provides updated references to project management level Program Management and Assessment Configuration Management activities, and provides working level directions for submitting requirements and project documentation related to the Hanford Tanks Initiative (HTI) project. This includes documents and information created by HTI, as well as non-HTI generated materials submitted to the project

  13. Demand-side management process evaluations - the management perspective

    International Nuclear Information System (INIS)

    Perrault, G.A.; Barrett, L.B.

    1993-01-01

    A demand-side management (DSM) process evaluation is a qualitative, expert assessment of how a utility marketing program is being conducted. It reviews the efficiency and effectiveness in which a utility plans, manages, executes, and monitors the delivery of DSM programs to its marketplace. Process evaluations,which includes load impact, customer satisfaction and cost-effectiveness analysis, are becoming an increasingly significant component. The process evaluation focus is on the program planning and delivery process as opposed to the energy impacts resulting from the specific measures or products of the program. Because of this process-oriented focus, such evaluations can identify important opportunities for improving the cost-effectiveness of a program without significantly changing product lines. The evaluation may identify administrative or delivery process improvements. In addition, the evaluation may identify ways of improving the degree to which the customer is satisfied with the program or the utility. Since process evaluations are usually conducted as part of a utility's mandated DSM measurement and evaluation plan, they tend to focus mainly on the stated needs of the regulator as opposed to company management. This can be a problem. Although the regulatory perspective is important, in an increasingly competitive business environment, utilities must not overlook management's business and operational needs for specific information regarding DSM program planning, control, execution, and evaluation. This paper discusses some of the conflicts that exist between the regulator's and management's needs for DSM program evaluation results and presents some approaches for assuring that both needs are met. It is organized to first discuss the scope of a process evaluation, then the evaluation issues, the management concerns, and finally reporting of results

  14. Transportation and disposal configuration for DOE-managed low-level and mixed low-level waste

    International Nuclear Information System (INIS)

    Johnsen, T.

    1993-06-01

    This report briefly examines the current U.S. Department of Energy complex-wide configuration for transportation and disposal of low-level and mixed low-level waste, and also retraces the historical sequence of events and rationale that has guided its development. The study determined that Nevada Test Site and the Hanford Site are the only two sites that currently provide substantial disposal services for offsite low-level waste generators. It was also determined that mixed low-level waste shipments are infrequent and are generally limited to shipments to offsite commercial treatment facilities or other Department of Energy sites for storage. The current alignment of generator to disposal site for low-level waste shipments is generally consistent with the programmatic mission of the generator; that is, defense-generated waste is shipped to the Nevada Test Site and research-generated waste is transported to the Hanford Site. The historical development of the current configuration was resurrected by retrieving Department of Energy documentation and interviewing both current and former department and contractor personnel. According to several accounts, the basic framework of the system was developed during the late 1970s, and was reportedly based on the ability of the disposal site to manage a given waste form. Documented evidence to support this reasoning, however, could not be uncovered

  15. GREEN BUSINESS PROCESS MANAGEMENT: A RESEARCH AGENDA

    Directory of Open Access Journals (Sweden)

    Aditya Ghose

    2010-01-01

    Full Text Available There is a global consensus on the need to reduce our collective carbon footprint. While much research attention has focused on developing alternative energy sources, automotive technologies or waste disposal techniques, we often ignore the fact that the ability to optimize (existing operations to reduce their emissions impact is fundamental to this exercise. Business process management (BPM technology, with its focus on understanding, modelling and improving/optimizing business processes, is a key starting point. Process modelling technology has applications beyond what we would traditionally describe as business processes - we can also model and improve manufacturing and other "physical" processes. This paper describes the contours of the emerging research landscape in green business process management and presents some early results in this area.

  16. THE RIGHT TO REMEDIES IN THE CRIMINAL PROCESS: ABOUT THE CONFIGURATION OF THE APPEAL IN AN ACCUSATORY MODEL. THE APPEAL IN THE MEXICAN NPPC

    Directory of Open Access Journals (Sweden)

    Amaya Arnáiz Serrano

    2018-04-01

    Full Text Available the article discusses the configuration of the appeal in the Criminal Procedure Code of Mexico, verifying if such modeling is in accordance with the constitutional guarantees of the process.

  17. A portfolio management system in the strategic management process

    Directory of Open Access Journals (Sweden)

    Qifan Huang

    2017-02-01

    Full Text Available Strategic management is the process of “what we are” which decides and implements “what we intend to be and how we are going to get there.” Strategy describes how an organization intends to compete with the resource available in the existing and perceived future environment. “Project management” is ancient, but also emerging. The wise human ancestors left numerous miracles with us, project management is a branch of the discipline of management, including the pyramids, statues of Zeus, Lighthouse of Alexandria, etc., which are brilliant pages in the history of project management. A project is a plan to solve the problem and effectively complete the established goal of the projects, so you have to go on strategic management for the project. Policy management is the means to achieve its objectives, including planning, implementation and control process. Strategic management is to gather staffs with different functions and form the project team. Due to its properties with a variety of different functions, more flexible management of property strategy in accordance with its special functions should be made in response to the changing internal and external environment. Management of functions is the role and performance management. It is not crime and punishment, but sparse and guide. Instead of the occurrence and discovery of issues, the difficulty is finding the solutions to problems by observations and recommendations. The management functions need to recognize their own responsibilities, and help the company to have a more long-term development of rational thinking.

  18. Development of advanced spent fuel management process. System analysis of advanced spent fuel management process

    International Nuclear Information System (INIS)

    Ro, S.G.; Kang, D.S.; Seo, C.S.; Lee, H.H.; Shin, Y.J.; Park, S.W.

    1999-03-01

    The system analysis of an advanced spent fuel management process to establish a non-proliferation model for the long-term spent fuel management is performed by comparing the several dry processes, such as a salt transport process, a lithium process, the IFR process developed in America, and DDP developed in Russia. In our system analysis, the non-proliferation concept is focused on the separation factor between uranium and plutonium and decontamination factors of products in each process, and the non-proliferation model for the long-term spent fuel management has finally been introduced. (Author). 29 refs., 17 tabs., 12 figs

  19. Influence of ion source configuration and its operation parameters on the target sputtering and implantation process.

    Science.gov (United States)

    Shalnov, K V; Kukhta, V R; Uemura, K; Ito, Y

    2012-06-01

    In the work, investigation of the features and operation regimes of sputter enhanced ion-plasma source are presented. The source is based on the target sputtering with the dense plasma formed in the crossed electric and magnetic fields. It allows operation with noble or reactive gases at low pressure discharge regimes, and, the resulting ion beam is the mixture of ions from the working gas and sputtering target. Any conductive material, such as metals, alloys, or compounds, can be used as the sputtering target. Effectiveness of target sputtering process with the plasma was investigated dependently on the gun geometry, plasma parameters, and the target bias voltage. With the applied accelerating voltage from 0 to 20 kV, the source can be operated in regimes of thin film deposition, ion-beam mixing, and ion implantation. Multi-component ion beam implantation was applied to α-Fe, which leads to the surface hardness increasing from 2 GPa in the initial condition up to 3.5 GPa in case of combined N(2)-C implantation. Projected range of the implanted elements is up to 20 nm with the implantation energy 20 keV that was obtained with XPS depth profiling.

  20. Optimal design of advanced distillation configuration for enhanced energy efficiency of waste solvent recovery process in semiconductor industry

    International Nuclear Information System (INIS)

    Chaniago, Yus Donald; Minh, Le Quang; Khan, Mohd Shariq; Koo, Kee-Kahb; Bahadori, Alireza; Lee, Moonyong

    2015-01-01

    Highlights: • Thermally coupled distillation process is proposed for waste solvent recovery. • A systematic optimization procedure is used to optimize distillation columns. • Response surface methodology is applied to optimal design of distillation column. • Proposed advanced distillation allows energy efficient waste solvent recovery. - Abstract: The semiconductor industry is one of the largest industries in the world. On the other hand, the huge amount of solvent used in the industry results in high production cost and potential environmental damage because most of the valuable chemicals discharged from the process are incinerated at high temperatures. A distillation process is used to recover waste solvent, reduce the production-related costs and protect the environment from the semiconductor industrial waste. Therefore, in this study, a distillation process was used to recover the valuable chemicals from semiconductor industry discharge, which otherwise would have been lost to the environment. The conventional sequence of distillation columns, which was optimized using the Box and sequential quadratic programming method for minimum energy objectives, was used. The energy demands of a distillation problem may have a substantial influence on the profitability of a process. A thermally coupled distillation and heat pump-assisted distillation sequence was implemented to further improve the distillation performance. Finally, a comparison was made between the conventional and advanced distillation sequences, and the optimal conditions for enhancing recovery were determined. The proposed advanced distillation configuration achieved a significant energy saving of 40.5% compared to the conventional column sequence

  1. Geological mapping of lunar highland crater Lalande: Topographic configuration, morphology and cratering process

    Science.gov (United States)

    Li, Bo; Ling, Zongcheng; Zhang, Jiang; Chen, Jian; Liu, ChangQing; Bi, Xiangyu

    2018-02-01

    Highland crater Lalande (4.45°S, 8.63°W; D = 23.4 km) is located on the PKT area of the lunar near side, southeast of the Mare Insularum. It is a complex crater in Copernican era and has three distinguishing features: high silicic anomaly, the highest Th abundance and special landforms on its floor. There are some low-relief bulges on the left of Lalande's floor with regular circle or ellipse shapes. They are ∼250-680 m wide and ∼30-91 m high with maximum flank slopes >20°. There are two possible scenarios for the formation of these low-relief bulges which are impact melt products or young silicic volcanic eruptions. We estimated the absolute model ages of the ejecta deposits, several melt ponds and the hummocky floor and determined the ratio of diameter and depth of the crater Lalande. In addition, we found some similar bugle features within other Copernican-aged craters and there were no volcanic source vents on Lalande's floor. Thus, we hypothesized that these low-relief bulges were most consistent with an origin of impact melts during the crater formation instead of small and young volcanic activities occurring on the floor. Based on Kaguya Terrain Camera (TC) ortho-mosaic and Digital Terrain Model (DTM) data produced by TC imagery in stereo, geological units and some linear features on the floor and wall of Lalande have been mapped. Eight geological units are organized by crater floor units: hummocky floor, central peak and low-relief bulges; and crater wall units: terraced walls, channeled and veneered walls, interior walls, mass wasting areas, blocky areas, and melt ponds. These geological units and linear features provided us a chance to understand some details of the cratering process and elevation differences on the floor. We proposed that subsidence due to melt cooling, late-stage wall collapse and rocks uplifted from beneath the surface could be the possible causes of the observed elevation differences on Lalande's floor.

  2. Information processing among high-performance managers

    Directory of Open Access Journals (Sweden)

    S.C. Garcia-Santos

    2010-01-01

    Full Text Available The purpose of this study was to evaluate the information processing of 43 business managers with a professional superior performance. The theoretical framework considers three models: the Theory of Managerial Roles of Henry Mintzberg, the Theory of Information Processing, and Process Model Response to Rorschach by John Exner. The participants have been evaluated by Rorschach method. The results show that these managers are able to collect data, evaluate them and establish rankings properly. At same time, they are capable of being objective and accurate in the problems assessment. This information processing style permits an interpretation of the world around on basis of a very personal and characteristic processing way or cognitive style.

  3. RISK MANAGEMENT PROCESSES IN SUPPLY CHAINS

    Directory of Open Access Journals (Sweden)

    Aleksandar Aleksić

    2009-06-01

    Full Text Available One of the keys of successful business last few years is effective dealing with risks in every meaning of that word. At the time when the world economic crisis largely limits business, successful Risk management is the only way of survival for a large number of business systems. This paper will present the processes of risk management in supply chains that are in accordance with the standards ISO 28000 and ISO 31000. By implementing a holistic, enterprise-wide supply chain risk management program, companies also can uphold their commitment to providing strong corporate governance on behalf of stakeholders and increase their market value.

  4. From conceptual process models to running systems: a holistic approach for the configuration of enterprise system processes

    NARCIS (Netherlands)

    Dreiling, A.; Rosemann, M.; Aalst, van der W.M.P.; Sadiq, W.

    2008-01-01

    This paper proposes a method which aims at increasing the efficiency of enterprise system implementations. First, we argue that existing process modeling languages that feature different degrees of abstraction for different user groups exist and are used for different purposes which makes it

  5. Low cost fuel cell diffusion layer configured for optimized anode water management

    Science.gov (United States)

    Owejan, Jon P; Nicotera, Paul D; Mench, Matthew M; Evans, Robert E

    2013-08-27

    A fuel cell comprises a cathode gas diffusion layer, a cathode catalyst layer, an anode gas diffusion layer, an anode catalyst layer and an electrolyte. The diffusion resistance of the anode gas diffusion layer when operated with anode fuel is higher than the diffusion resistance of the cathode gas diffusion layer. The anode gas diffusion layer may comprise filler particles having in-plane platelet geometries and be made of lower cost materials and manufacturing processes than currently available commercial carbon fiber substrates. The diffusion resistance difference between the anode gas diffusion layer and the cathode gas diffusion layer may allow for passive water balance control.

  6. Process management and controlling in diagnostic radiology

    International Nuclear Information System (INIS)

    Gocke, P.; Debatin, J.F.; Duerselen, L.F.J.

    2002-01-01

    Systematic process management and efficient quality control is rapidly gaining importance in our healthcare system. What does this mean for diagnostic radiology departments?To improve efficiency, quality and productivity the workflow within the department of diagnostic and interventional radiology at the University Hospital of Essen were restructured over the last two years. Furthermore, a controlling system was established. One of the pursued aims was to create a quality management system as a basis for the subsequent certification according to the ISO EN 9001:2000 norm.Central to the success of the workflow reorganisation was the training of selected members of the department's staff in process and quality management theory. Thereafter, a dedicated working group was created to prepare the reorganisation and the subsequent ISO certification with the support of a consulting partner. To assure a smooth implementation of the restructured workflow and create acceptance for the required ISO-9001 documentation, the entire staff was familiarized with the basic ideas of process- and quality-management in several training sessions.This manuscript summarizes the basic concepts of process and quality management as they were taught to our staff. A direct relationship towards diagnostic radiology is maintained throughout the text. (orig.) [de

  7. Dynamic Model-Based Evaluation of Process Configurations for Integrated Operation of Hydrolysis and Co-Fermentation for Bioethanol Production from Lignocellulose

    DEFF Research Database (Denmark)

    Morales Rodriguez, Ricardo; Meyer, Anne S.; Gernaey, Krist

    2011-01-01

    In this study a number of different process flowsheets were generated and their feasibility evaluated using simulations of dynamic models. A dynamic modeling framework was used for the assessment of operational scenarios such as, fed-batch, continuous and continuous with recycle configurations. E......) operating in continuous mode with a recycle of the SSCF reactor effluent, results in the best productivity of bioethanol among the proposed process configurations, with a yield of 0.18 kg ethanol/kg dry-biomass........ Each configuration was evaluated against the following benchmark criteria, yield (kg ethanol/kg dry-biomass), final product concentration and number of unit operations required in the different process configurations. The results show that simultaneous saccharification and co-fermentation (SSCF...

  8. Ontological Model of Business Process Management Systems

    Science.gov (United States)

    Manoilov, G.; Deliiska, B.

    2008-10-01

    The activities which constitute business process management (BPM) can be grouped into five categories: design, modeling, execution, monitoring and optimization. Dedicated software packets for business process management system (BPMS) are available on the market. But the efficiency of its exploitation depends on used ontological model in the development time and run time of the system. In the article an ontological model of BPMS in area of software industry is investigated. The model building is preceded by conceptualization of the domain and taxonomy of BPMS development. On the base of the taxonomy an simple online thesaurus is created.

  9. Crisis crowdsourcing framework: designing strategic configurations of crowdsourcing for the emergency management domain

    Science.gov (United States)

    Liu, Sophia B.

    2014-01-01

    Crowdsourcing is not a new practice but it is a concept that has gained significant attention during recent disasters. Drawing from previous work in the crisis informatics, disaster sociology, and computer-supported cooperative work (CSCW) literature, the paper first explains recent conceptualizations of crowdsourcing and how crowdsourcing is a way of leveraging disaster convergence. The CSCW concept of “articulation work” is introduced as an interpretive frame for extracting the salient dimensions of “crisis crowdsourcing.” Then, a series of vignettes are presented to illustrate the evolution of crisis crowdsourcing that spontaneously emerged after the 2010 Haiti earthquake and evolved to more established forms of public engagement during crises. The best practices extracted from the vignettes clarified the efforts to formalize crisis crowdsourcing through the development of innovative interfaces designed to support the articulation work needed to facilitate spontaneous volunteer efforts. Extracting these best practices led to the development of a conceptual framework that unpacks the key dimensions of crisis crowdsourcing. The Crisis Crowdsourcing Framework is a systematic, problem-driven approach to determining the why, who, what, when, where, and how aspects of a crowdsourcing system. The framework also draws attention to the social, technological, organizational, and policy (STOP) interfaces that need to be designed to manage the articulation work involved with reducing the complexity of coordinating across these key dimensions. An example of how to apply the framework to design a crowdsourcing system is offered with with a discussion on the implications for applying this framework as well as the limitations of this framework. Innovation is occurring at the social, technological, organizational, and policy interfaces enabling crowdsourcing to be operationalized and integrated into official products and services.

  10. Talent Management: Working lines and key processes

    Directory of Open Access Journals (Sweden)

    Alvaro Alonso

    2014-12-01

    ways are established talent management as the treatment of these dimensions. Furthermore, we conclude that any talent plan includes processes or phases: attraction, selection, identification, development and retention.Value: Unlike other proposals, we consider it necessary to incorporate an additional referral study around key positions in the organization. Thus, characterization and cataloging of the previous literature is provided, as well as comparative analysis of heterogeneous definitions of talent and talent management. Furthermore, we propose that talent management is not just a tool for the implementation of the strategy, but it is situate since the start of the strategic process, that is, from strategic formulation. Thus, we focus on the approach advocated from the third line of study.

  11. 77 FR 13585 - Electricity Subsector Cybersecurity Risk Management Process Guideline

    Science.gov (United States)

    2012-03-07

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process Guideline AGENCY... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk... Cybersecurity Risk Management Process Guideline. The primary goal of this guideline is to describe a risk...

  12. Using color management in color document processing

    Science.gov (United States)

    Nehab, Smadar

    1995-04-01

    Color Management Systems have been used for several years in Desktop Publishing (DTP) environments. While this development hasn't matured yet, we are already experiencing the next generation of the color imaging revolution-Device Independent Color for the small office/home office (SOHO) environment. Though there are still open technical issues with device independent color matching, they are not the focal point of this paper. This paper discusses two new and crucial aspects in using color management in color document processing: the management of color objects and their associated color rendering methods; a proposal for a precedence order and handshaking protocol among the various software components involved in color document processing. As color peripherals become affordable to the SOHO market, color management also becomes a prerequisite for common document authoring applications such as word processors. The first color management solutions were oriented towards DTP environments whose requirements were largely different. For example, DTP documents are image-centric, as opposed to SOHO documents that are text and charts centric. To achieve optimal reproduction on low-cost SOHO peripherals, it is critical that different color rendering methods are used for the different document object types. The first challenge in using color management of color document processing is the association of rendering methods with object types. As a result of an evolutionary process, color matching solutions are now available as application software, as driver embedded software and as operating system extensions. Consequently, document processing faces a new challenge, the correct selection of the color matching solution while avoiding duplicate color corrections.

  13. Tank waste remediation system privatization infrastructure program requirements and document management process guide

    International Nuclear Information System (INIS)

    ROOT, R.W.

    1999-01-01

    This guide provides the Tank Waste Remediation System Privatization Infrastructure Program management with processes and requirements to appropriately control information and documents in accordance with the Tank Waste Remediation System Configuration Management Plan (Vann 1998b). This includes documents and information created by the program, as well as non-program generated materials submitted to the project. It provides appropriate approval/control, distribution and filing systems

  14. A process framework for information security management

    Directory of Open Access Journals (Sweden)

    Knut Haufe

    2016-01-01

    Full Text Available Securing sensitive organizational data has become increasingly vital to organizations. An Information Security Management System (ISMS is a systematic approach for establishing, implementing, operating, monitoring, reviewing, maintaining and improving an organization's information security. Key elements of the operation of an ISMS are ISMS processes. However, and in spite of its importance, an ISMS process framework with a description of ISMS processes and their interaction as well as the interaction with other management processes is not available in the literature. Cost benefit analysis of information security investments regarding single measures protecting information and ISMS processes are not in the focus of current research, mostly focused on economics. This article aims to fill this research gap by proposing such an ISMS process framework as the main contribution. Based on a set of agreed upon ISMS processes in existing standards like ISO 27000 series, COBIT and ITIL. Within the framework, identified processes are described and their interaction and interfaces are specified. This framework helps to focus on the operation of the ISMS, instead of focusing on measures and controls. By this, as a main finding, the systemic character of the ISMS consisting of processes and the perception of relevant roles of the ISMS is strengthened.

  15. Process Management Practices In Healthcare Institutions

    OpenAIRE

    Şükrü Kılıç; Cumhur Aydınlı

    2015-01-01

    Healthcare institutions differ from other service businesses by their “matrix organizational structure” and “error-free output” requirement. However, the processes stay the same for all organizational activities at different levels. One of the post-modern management approach is to focus on basis of necessary processes and fundamental organizational changes. This case study aims to initially explain the characteristics of healthcare institutions and the ba...

  16. Cost estimation and economical evaluation of three configurations of activated sludge process for a wastewater treatment plant (WWTP) using simulation

    Science.gov (United States)

    Jafarinejad, Shahryar

    2017-09-01

    The activated sludge (AS) process is a type of suspended growth biological wastewater treatment that is used for treating both municipal sewage and a variety of industrial wastewaters. Economical modeling and cost estimation of activated sludge processes are crucial for designing, construction, and forecasting future economical requirements of wastewater treatment plants (WWTPs). In this study, three configurations containing conventional activated sludge (CAS), extended aeration activated sludge (EAAS), and sequencing batch reactor (SBR) processes for a wastewater treatment plant in Tehran city were proposed and the total project construction, operation labor, maintenance, material, chemical, energy and amortization costs of these WWTPs were calculated and compared. Besides, effect of mixed liquor suspended solid (MLSS) amounts on costs of WWTPs was investigated. Results demonstrated that increase of MLSS decreases the total project construction, material and amortization costs of WWTPs containing EAAS and CAS. In addition, increase of this value increases the total operation, maintenance and energy costs, but does not affect chemical cost of WWTPs containing EAAS and CAS.

  17. KNOWLEDGE MANAGEMENT PROCESSES AND INTELLECTUAL PROPERTY MANAGEMENT PROCESSES: AN INTEGRATED CONCEPTUAL FRAMEWORK

    OpenAIRE

    HENAO-CALAD, MONICA; RIVERA-MONTOYA, PAULA; URIBE-OCHOA, BEATRIZ

    2017-01-01

    ABSTRACT Intellectual property management, knowledge management are disciplines that have been treated independently, both in academia and in the organizational field. Through the legal discipline of intellectual property, the former manages intangible assets that are eligible for protection (copyright, patents and trademarks, among others) leaving aside those assets that cannot be realized in any way. The latter is devoted to the processes of knowledge management in general, namely, the know...

  18. Metering systems and demand-side management models applied to hybrid renewable energy systems in micro-grid configuration

    International Nuclear Information System (INIS)

    Blasques, L.C.M.; Pinho, J.T.

    2012-01-01

    This paper proposes a demand-side management model integrated to a metering system for hybrid renewable energy systems in micro-grid configuration. The proposal is based on the management problems verified in most of this kind of renewable hybrid systems installed in Brazil. The main idea is the implementation of a pre-paid metering system with some control functions that directly act on the consumer demand, restricting the consumption proportionally to the monthly availability of renewable energy. The result is a better distribution of the electricity consumption by month and by consumer, preventing that only one user, with larger purchasing power, consumes all the renewable energy available at some time period. The proportionality between the consumption and the renewable energy's availability has the objective to prevent a lack of energy stored and a high use of the diesel generator-set on months of low renewable potential. This paper also aims to contribute to the Brazilian regulation of renewable energy systems supplying micro-grids. - Highlights: ► Review of the Brazilian electricity regulation for small-scale isolated systems. ► Renewable systems are the most feasible option in several isolated communities. ► One proposal is to guarantee government subsidies for renewable energy systems. ► Smart electronic meters to create electricity restrictions for the consumers.

  19. NEW PERSPECTIVES ON STRATEGIC MANAGEMENT PROCESS

    Directory of Open Access Journals (Sweden)

    POP Zenovia Cristiana

    2013-07-01

    Full Text Available For developing economies the development of enterprises should be a strategic goal, this way of thinking may become viable only as a result of a combination of judicious analysis based on specific local economic aspects and a set of actions to correct any slippage or amplify existing development trends taken by the managers. A better leadership would unequivocally lead to a better strategy but sometimes the lack of information, first about the external environment, continuously undergoing quick and radical changes, the political problems and the complexity of the implementation of the strategy or the costs that it implies are not taken into consideration. Therefore managers have two options: to establish strategies, which would lead to the achievement of the objectives; evaluate them on the basis of economic efficiency or to identify an already existent strategy and to adapt it to the environment changes in which the enterprise carries on its activity. This paper aims at discussing and explaining from a theoretical perspective, the evolution and the advantages and disadvantages of the strategic management process, in order to convey the managers a modality to achieve competitiveness and evaluate the position of the firm. In the first section, we explain the the necessity of strategic management process. In the second section we present the different evolution stages. The third section presents our conclusions regarding the advantages and disadvantages of the strategic management process, fundamental for the strategy success. The financial crisis did affect the Romanian economy and Romanian enterprises early in 2009 registering an impact of the crisis identified in the need of the managers to rethink their strategies, to improve their management skills and perspectives on the role of the employees after the crisis. In this paper we try to underline the evolution stages of the strategic management process with its own characteristics by which both

  20. Implementation of a formulary management process.

    Science.gov (United States)

    Karel, Lauren I; Delisle, Dennis R; Anagnostis, Ellena A; Wordell, Cindy J

    2017-08-15

    The application of lean methodology in an initiative to redesign the formulary maintenance process at an academic medical center is described. Maintaining a hospital formulary requires clear communication and coordination among multiple members of the pharmacy department. Using principles of lean methodology, pharmacy department personnel within a multihospital health system launched a multifaceted initiative to optimize formulary management systemwide. The ongoing initiative began with creation of a formulary maintenance redesign committee consisting of pharmacy department personnel with expertise in informatics, automation, purchasing, drug information, and clinical pharmacy services. The committee met regularly and used lean methodology to design a standardized process for management of formulary additions and deletions and changes to medications' formulary status. Through value stream analysis, opportunities for process and performance improvement were identified; staff suggestions on process streamlining were gathered during a series of departmental kaizen events. A standardized template for development and dissemination of monographs associated with formulary additions and status changes was created. In addition, a shared Web-based checklist was developed to facilitate information sharing and timely initiation and completion of tasks involved in formulary status changes, and a permanent formulary maintenance committee was established to monitor and refine the formulary management process. A clearly defined, standardized process within the pharmacy department was developed for tracking necessary steps in enacting formulary changes to encourage safe and efficient workflow. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  1. Development of Simulator Configuration Tool

    International Nuclear Information System (INIS)

    Nedrelid, Olav; Pettersen, Geir

    1996-01-01

    The main objective of the development of a Simulator Configuration Tool (SCT) is to achieve faster and more efficient production of dynamic simulators. Through application of versatile graphical interfaces, the simulator builder should be able to configure different types of simulators including full-scope process simulators. The SCT should be able to serve different simulator environments. The configuration tool communicates with simulator execution environments through a TCP/IP-based interface, Communication with a Model Server System developed at Institutt for energiteknikk has been established and used as test case. The system consists of OSF/Motif dialogues for operations requiring textual input, list selections etc., and uses the Picasso-3 User Interface Management System to handle presentation of static and dynamic graphical information. (author)

  2. Accumulating project management knowledge through process theory

    NARCIS (Netherlands)

    Niederman, Fred; March, Salvatore T.; Mueller, Benjamin

    2014-01-01

    This paper describes how the general notion of process theory can provide a foundational component in a portfolio of project management theories. The paper begins by outlining a variety of views pertaining to the nature of theory and theory development. This forms a basis for understanding how

  3. Error management process for power stations

    International Nuclear Information System (INIS)

    Hirotsu, Yuko; Takeda, Daisuke; Fujimoto, Junzo; Nagasaka, Akihiko

    2016-01-01

    The purpose of this study is to establish 'error management process for power stations' for systematizing activities for human error prevention and for festering continuous improvement of these activities. The following are proposed by deriving concepts concerning error management process from existing knowledge and realizing them through application and evaluation of their effectiveness at a power station: an entire picture of error management process that facilitate four functions requisite for maraging human error prevention effectively (1. systematizing human error prevention tools, 2. identifying problems based on incident reports and taking corrective actions, 3. identifying good practices and potential problems for taking proactive measures, 4. prioritizeng human error prevention tools based on identified problems); detail steps for each activity (i.e. developing an annual plan for human error prevention, reporting and analyzing incidents and near misses) based on a model of human error causation; procedures and example of items for identifying gaps between current and desired levels of executions and outputs of each activity; stages for introducing and establishing the above proposed error management process into a power station. By giving shape to above proposals at a power station, systematization and continuous improvement of activities for human error prevention in line with the actual situation of the power station can be expected. (author)

  4. Managing performance through business processes from BPM to the practice of process management

    CERN Document Server

    Thiault, Dominique

    2012-01-01

    Centred on the performance of the company, this book is a practical guide that organises Business Process Management (BPM) around these major subjects, such as process management, process governance, or the setting up a successful process approach in the company. Each of these subjects is introduced didactically, alternating examples and in-depth information. Relying on implementation recommendations, practical sheets, and illustrations, managing performance through processes can be used, first, to increase the chances that the objectives will be reached and to improve company performance (industrial organisation, service organisation, private or public sector) and to offer methods, rules, models, and practical supports that can easily be reused. The result of a combination of several experiences in the field and of rewarding encounters with managers, experts, and high-level executives, this book durably places the processes in their managerial dimension. It also presents an opening to a systematic approach t...

  5. Credit Risk Management - Loan Approval Process

    Directory of Open Access Journals (Sweden)

    Lulzim Rashiti

    2016-03-01

    Full Text Available The aim of this study is on understanding the international regulations issued by Basel I, Basel II and Basel III to best supervise and manage credit risk management policies. Part of paper will focus on the description and impacts of the regulations and the pivotal importance they play in providing a sound banking system. Credit risk represents another important element that will be analysed considering that it lays the foundation during the loan consideration and approval process. The paper will also explain in detail procedures and responsibilities shared along the process of loan acceptance by a banker. To sum up, the overall process from application to loan approval or denial will be explained pointing out the implications that are faced along the way

  6. Experimental design approach to the process parameter optimization for laser welding of martensitic stainless steels in a constrained overlap configuration

    Science.gov (United States)

    Khan, M. M. A.; Romoli, L.; Fiaschi, M.; Dini, G.; Sarri, F.

    2011-02-01

    This paper presents an experimental design approach to process parameter optimization for the laser welding of martensitic AISI 416 and AISI 440FSe stainless steels in a constrained overlap configuration in which outer shell was 0.55 mm thick. To determine the optimal laser-welding parameters, a set of mathematical models were developed relating welding parameters to each of the weld characteristics. These were validated both statistically and experimentally. The quality criteria set for the weld to determine optimal parameters were the minimization of weld width and the maximization of weld penetration depth, resistance length and shearing force. Laser power and welding speed in the range 855-930 W and 4.50-4.65 m/min, respectively, with a fiber diameter of 300 μm were identified as the optimal set of process parameters. However, the laser power and welding speed can be reduced to 800-840 W and increased to 4.75-5.37 m/min, respectively, to obtain stronger and better welds.

  7. [Reflections on the management of deinstitutionalization process].

    Science.gov (United States)

    Lucena, Marcela Adriana da Silva; Bezerra, Adriana Falangola Benjamin

    2012-09-01

    This study addresses mental health and, based on a conceptual review, offers considerations on the management of deinstitutionalization processes regarding individuals interned in long-stay psychiatric institutions. Elements concerning asylum formation and logic are discussed, along with the mechanisms necessary for the effective change in paradigm and practices, with deinstitutionalization and psychosocial rehabilitation as the core issues. Reflections are offered regarding management actions committed to the psychosocial model, linking such actions to the application of the components of care and going beyond the articulation of the tools of mental health policy. Theoretical reflection offers suggestions referring to the qualification processes of mental health professionals, deinstitutionalization in the management of the Unified Health System and tripartite action with co-accountability in actions and financing. The final considerations recognize the bureaucratic obstacles in the public realm and propose facing these challenges as a management challenge, along with processes of change that can radically commit to the lives of people, thereby broadening the discussion to the ethical realm.

  8. Intermediaries in the Management Process of Innovation

    DEFF Research Database (Denmark)

    Gretzinger, Susanne; Hinz, Holger; Matiaske, Wenzel

    2012-01-01

    Information is a critical resource in innovation processes. SMEs are therefore advised to draw on consulting in innovation processes, as they cannot ensure the necessary information flow internally due to lesser resources. From the strategic point of view, the involvement of intermediaries is acc...... is accompanied by the risk of losing specific knowledge to the business environment. But the other way around: To neglect the integration of consultancies could mean a deficit in the process of information management.......Information is a critical resource in innovation processes. SMEs are therefore advised to draw on consulting in innovation processes, as they cannot ensure the necessary information flow internally due to lesser resources. From the strategic point of view, the involvement of intermediaries...

  9. Configuration by Modularisation

    DEFF Research Database (Denmark)

    Riitahuhta, Asko; Andreasen, Mogens Myrup

    1998-01-01

    Globally operating companies have realized that locally customized products and services are today the prerequisite for the success. The capability or the paradigm to act locally in global markets is called Mass Customization [Victor 1997]. The prerequisite for Mass Customization is Configuration...... Management and i Configuration Management the most important means is Modularisation.The goal of this paper is to show Configuration Management as a contribution to the Mass Customisation and Modularisation as a contribution to the industrialisation of the design area [Andreasen 1997]. A basic model...... for the creation of a structured product family is presented and examples are given. The concepts of a novel Dynamic Modularisation method, Metrics for Modularisation and Design for Configurability are presented....

  10. Study in stationary state of the subcriticality of intermediate configurations of core in the reloading process of a BWR

    International Nuclear Information System (INIS)

    Hernandez, J.L.; Montes, J.L.; Perusquia, R.; Ortiz, J.J.

    2006-01-01

    In this work is carried out the simulation in three dimensions with the COREMASTER-PRESTO code, of the behavior of the reactor core in different stages of the change process of fuel assemblies. To carry out the simulation, this code requires of a database of nuclear parameters that includes those that can associate to the areas of an assemblies that they don't contain fuel and in its place there is moderator. These nuclear parameters are calculated with the AURORA-HELIOS-ZENITH-TABGEN system. One of the approaches that were carried out consisted on designing a 'water assemble', that is to say, an axial arrangement of 25 'water cells'. To obtain the appropriate 'water cell' its were carried out some selective test cases, since it presents in two cases the necessity to find an enough minimum value of fissile material for the correct execution of HELIOS, firstly, and later on COREMASTER-PRESTO. In the first case, the situation is solved when placing symmetrically 6 bars with natural uranium in the lateral areas of the cell; with that which the value of k inf of 0.1592 is obtained in the calculations with the HELIOS code in the cold condition to zero power (CZP), and 0% of vacuums. For the second case the cell includes symmetrically 28 bars with natural uranium, and the k inf value is 0.45290. These values are the maximum through the life of the 'cell.' As part of the activities that are developed during the fuel substitution, this the one of evaluating the subcriticality of the core each determined number of substitution movements. The obtained results when evaluating the k-effective in cold condition, in 5 different intermediate core configurations, as the loading process of the fuel advances are presented. To make the evaluation with CM-PRESTO in each configuration it was proceeded to complete the rest of the 444 assemblies with the one denominated 'water assemble'. In all the evaluated cases the subcriticality of the core was demonstrated in cold condition and with

  11. Process management - critical safety issues with focus on risk management

    International Nuclear Information System (INIS)

    Sanne, Johan M.

    2005-12-01

    Organizational changes focused on process orientation are taking place among Swedish nuclear power plants, aiming at improving the operation. The Swedish Nuclear Power Inspectorate has identified a need for increased knowledge within the area for its regulatory activities. In order to analyze what process orientation imply for nuclear power plant safety a number of questions must be asked: 1. How is safety in nuclear power production created currently? What significance does the functional organization play? 2. How can organizational forms be analysed? What consequences does quality management have for work and for the enterprise? 3. Why should nuclear power plants be process oriented? Who are the customers and what are their customer values? Which customers are expected to contribute from process orientation? 4. What can one learn from process orientation in other safety critical systems? What is the effect on those features that currently create safety? 5. Could customer values increase for one customer without decreasing for other customers? What is the relationship between economic and safety interests from an increased process orientation? The deregulation of the electricity market have caused an interest in increased economic efficiency, which is the motivation for the interest in process orientation. among other means. It is the nuclear power plants' owners and the distributors (often the same corporations) that have the strongest interest in process orientation. If the functional organization and associated practices are decomposed, the prerequisites of the risk management regime changes, perhaps deteriorating its functionality. When nuclear power operators consider the introduction of process orientation, the Nuclear Power Inspectorate should require that 1. The operators perform a risk analysis beforehand concerning the potential consequences that process orientation might convey: the analysis should contain a model specifying how safety is currently

  12. Hybrid indirect/direct contactor for thermal management of counter-current processes

    Science.gov (United States)

    Hornbostel, Marc D.; Krishnan, Gopala N.; Sanjurjo, Angel

    2018-03-20

    The invention relates to contactors suitable for use, for example, in manufacturing and chemical refinement processes. In an aspect is a hybrid indirect/direct contactor for thermal management of counter-current processes, the contactor comprising a vertical reactor column, an array of interconnected heat transfer tubes within the reactor column, and a plurality of stream path diverters, wherein the tubes and diverters are configured to block all straight-line paths from the top to bottom ends of the reactor column.

  13. Analyzing the Accuracy of Calculations When Scoping Product Configuration Projects

    DEFF Research Database (Denmark)

    Bonev, Martin; Hvam, Lars

    2012-01-01

    Product configurators have increasingly been applied in industrial environments. With their help, companies providing customized products have managed to redesign their specification processes and to better handle the growing product variety. But despite the promising benefits, conducting...

  14. Aircraft Configuration and Flight Crew Compliance with Procedures While Conducting Flight Deck Based Interval Management (FIM) Operations

    Science.gov (United States)

    Shay, Rick; Swieringa, Kurt A.; Baxley, Brian T.

    2012-01-01

    Flight deck based Interval Management (FIM) applications using ADS-B are being developed to improve both the safety and capacity of the National Airspace System (NAS). FIM is expected to improve the safety and efficiency of the NAS by giving pilots the technology and procedures to precisely achieve an interval behind the preceding aircraft by a specific point. Concurrently but independently, Optimized Profile Descents (OPD) are being developed to help reduce fuel consumption and noise, however, the range of speeds available when flying an OPD results in a decrease in the delivery precision of aircraft to the runway. This requires the addition of a spacing buffer between aircraft, reducing system throughput. FIM addresses this problem by providing pilots with speed guidance to achieve a precise interval behind another aircraft, even while flying optimized descents. The Interval Management with Spacing to Parallel Dependent Runways (IMSPiDR) human-in-the-loop experiment employed 24 commercial pilots to explore the use of FIM equipment to conduct spacing operations behind two aircraft arriving to parallel runways, while flying an OPD during high-density operations. This paper describes the impact of variations in pilot operations; in particular configuring the aircraft, their compliance with FIM operating procedures, and their response to changes of the FIM speed. An example of the displayed FIM speeds used incorrectly by a pilot is also discussed. Finally, this paper examines the relationship between achieving airline operational goals for individual aircraft and the need for ATC to deliver aircraft to the runway with greater precision. The results show that aircraft can fly an OPD and conduct FIM operations to dependent parallel runways, enabling operational goals to be achieved efficiently while maintaining system throughput.

  15. Process safety management for highly hazardous chemicals

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    Purpose of this document is to assist US DOE contractors who work with threshold quantities of highly hazardous chemicals (HHCs), flammable liquids or gases, or explosives in successfully implementing the requirements of OSHA Rule for Process Safety Management of Highly Hazardous Chemicals (29 CFR 1910.119). Purpose of this rule is to prevent releases of HHCs that have the potential to cause catastrophic fires, explosions, or toxic exposures.

  16. 77 FR 30517 - Electricity Subsector Cybersecurity Risk Management Process

    Science.gov (United States)

    2012-05-23

    ... DEPARTMENT OF ENERGY Electricity Subsector Cybersecurity Risk Management Process AGENCY: Office of... Electricity Subsector Cybersecurity Risk Management Process guideline. The guideline describes a risk... Management Process. The primary goal of this guideline is to describe a risk management process that is...

  17. Managing Cultural Variation in Software Process Improvement

    DEFF Research Database (Denmark)

    Kræmmergaard, Pernille; Müller, Sune Dueholm; Mathiassen, Lars

    The scale and complexity of change in software process improvement (SPI) are considerable and managerial attention to organizational culture during SPI can therefore potentially contribute to successful outcomes. However, we know little about the impact of variations in organizational subculture ...... organizations can have important implications for SPI outcomes. Furthermore, it provides insights into how software managers can practically assess subcultures to inform decisions about and help prepare plans for SPI initiatives.......The scale and complexity of change in software process improvement (SPI) are considerable and managerial attention to organizational culture during SPI can therefore potentially contribute to successful outcomes. However, we know little about the impact of variations in organizational subculture...

  18. THORP - the management of the design process

    International Nuclear Information System (INIS)

    Thorpe, E.; Thurrell, B.H.; Varey, L.S.

    1991-01-01

    This Paper sets out to describe the organization of the design of the Thermal Oxide Reprocessing Plant (THORP) head end and chemical separation building. This posed many challenges not only because the building itself is a complicated engineering entity, but also because of the logistical aspects of administering the large number of engineers and draughtsmen -600 in total at peak- employed on the project. The effects of the necessary iterative design process, both technical and logistical, are outlined, together with a description of the manner in which the whole design process was managed. (author)

  19. Towards emergence phenomenon in business process management

    Directory of Open Access Journals (Sweden)

    Koryl Maciej

    2017-06-01

    Full Text Available A standard solution regarding business process management automation in enterprises is the use of workflow management systems working by the Rule-Based Reasoning approach. In such systems, the process model which is designed entirely before the implementation has to meet all needs deriving from business activity of the organization. In practice, it means that great limitations arise in process control abilities, especially in the dynamic business environment. Therefore, new kinds of workflow systems may help which typically work in more agile way e.g. following the Case-Based Reasoning approach. The paper shows another possible solution – the use of emergence theory which indicates among other conditions required to fulfill stimulation of the system (for example the business environment to run grass-roots processes that lead to arising of new more sophisticated organizing forms. The paper also points the using opportunity of such techniques as the processing of complex events to fulfill key conditions pointed by the emergence theory.

  20. MODELING OF MANAGEMENT PROCESSES IN AN ORGANIZATION

    Directory of Open Access Journals (Sweden)

    Stefan Iovan

    2016-05-01

    Full Text Available When driving any major change within an organization, strategy and execution are intrinsic to a project’s success. Nevertheless, closing the gap between strategy and execution remains a challenge for many organizations [1]. Companies tend to focus more on execution than strategy for quick results, instead of taking the time needed to understand the parts that make up the whole, so the right execution plan can be put in place to deliver the best outcomes. A large part of this understands that business operations don’t fit neatly within the traditional organizational hierarchy. Business processes are often messy, collaborative efforts that cross teams, departments and systems, making them difficult to manage within a hierarchical structure [2]. Business process management (BPM fills this gap by redefining an organization according to its end-to-end processes, so opportunities for improvement can be identified and processes streamlined for growth, revenue and transformation. This white paper provides guidelines on what to consider when using business process applications to solve your BPM initiatives, and the unique capabilities software systems provides that can help ensure both your project’s success and the success of your organization as a whole. majority of medium and small businesses, big companies and even some guvermental organizations [2].

  1. Losses of neutral injected fast ions due to adiabaticity breaking processes in a field-reversed configuration

    International Nuclear Information System (INIS)

    Takahashi, Toshiki; Inoue, Koji; Ishizuka, Takashi; Kondoh, Yoshiomi; Iwasawa, Naotaka

    2004-02-01

    Losses of neutral beam (NB) injected fast ions from the confinement region of a Field-Reversed Configuration (FRC) with a strong magnetic mirror are numerically analyzed for parameters relevant to NB injection experiments on the FIX (FRC injection experiment) device [T. Asai et al., Phys. Plasmas 7, 2294 (2000)]. Ionization processes of beam particles are calculated by the Monte Carlo method. The confinement of beam ions is discussed with the concept of accessible regions that restrict the ion excursion and are determined from two constants of motion, the kinetic energy and canonical angular momentum, in the case of an axisymmetric and a steady state FRC without an electrostatic field. From the calculation of the accessible regions, it is found that all the fast ions suffer from the orbit loss on the wall surface and/or the end loss. Single particle orbits are also calculated to find a difference of confinement properties from the results by employing the accessible regions. The magnetic moment is observed to show non-adiabatic motions of the beam ions, which cause a gradual orbit loss on the wall even in a case that a strong magnetic mirror is applied. The results show that the correlation of the magnetic moment disappears as the fast ions experience the density gradient around the separatrix surface and the field-null points. (author)

  2. Neoclassical theory of transport processes in toroidal magnetic confinement systems, with emphasis on non-axisymmetric configurations

    International Nuclear Information System (INIS)

    Kovrizhnykh, L.M.

    1984-01-01

    The paper constitutes a review of the neoclassical theory of transport processes in the different types of toroidal magnetic configuration now being used to study the possibility of producing a controlled thermonuclear reaction. Owing to the abundance of the material that has accumulated in recent years and the large number of parameters involved in the problem, it has not been possible to present all the mathematical calculations in detail while confining the results to a few definitive expressions. The general approach to a solution of the problem and its key aspects have been discussed as fully as possible, and a number of definitive results are presented. In the review, a history of the subject and an account of its present status are given, the problem itself is formulated, the basic equations are discussed and analytical solution methods are described. Definitive expressions are given for cross-field particle and energy fluxes, the bootstrap current and conductivity, all of which are required to solve the particle and heat balance equations in magnetic confinement devices. The results are presented in a relatively simple form which is convenient for analysis of the experimental data and are accompanied by tables containing numerical values for the universal coefficients in the definitive expressions. The review is aimed at both theoreticians and experimenters working in high-temperature plasma physics and controlled thermonuclear fusion. (author)

  3. Process-based project proposal risk management

    Directory of Open Access Journals (Sweden)

    Alok Kumar

    2016-12-01

    Full Text Available We all are aware of the organizational omnipresence. Projects within the organizations are ubiquitous too. Projects achieve their goals successfully if they are planned, scheduled, controlled and implemented well. The project lifecycle of initiating, planning, scheduling, controlling and implementing are very well-planned by project managers and the organizations. Successful projects have well-developed risk management plans to deal with situations impacting projects. Like any other organisation, a university does try to access funds for different purposes too. For such organisations, running a project is not the issue, rather getting a project proposal approved to fund a project is the key. Project proposal processing is done by the nodal office in every organisation. Usually, these nodal offices help in administration and submission of a project proposal for accessing funds. Seldom are these nodal project offices within the organizations facilitate a project proposal approval by proactively reaching out to the project managers. And as project managers prepare project proposals, little or no attention is made to prepare a project proposal risk plan so as to maximise project acquisition. Risk plans are submitted while preparing proposals but these risk plans cater to a requirement to address actual projects upon approval. Hence, a risk management plan for project proposal is either missing or very little effort is made to treat the risks inherent in project acquisition. This paper is an integral attempt to highlight the importance of risk treatment for project proposal stage as an extremely important step to preparing the risk management plan made for projects corresponding to their lifecycle phases. Several tools and techniques have been proposed in the paper to help and guide either the project owner (proposer or the main organisational unit responsible for project management. Development of tools and techniques to further enhance project

  4. How engineering data management and system support the main process[-oriented] functions of a large-scale project

    CERN Document Server

    Hameri, A P

    1999-01-01

    By dividing the development process into successive functional operations, this paper studies the benefits of establishing configuration management procedures and of using an engineering data management systems (EDMS) in order to execute the tasks. The underlying environment is that of CERN and the ongoing, a decade long, Large Hadron Collider (LHC)-project. By identifying the main functional groups who will use the EDMS the paper outlines the basic motivations and services provided by such a system to each process function. The implications of strict configuration management on the daily operation of each functional user group are also discussed. The main argument of the paper is that each and every user of the EDMS must act in compliance with the configuration management procedures to guarantee the overall benefits from the system. The pilot EDMS being developed at CERN, which serves as a test-bed to discover the real functional needs of the organisation of an EDMS supports the conclusions. The preliminary ...

  5. Comparative study of Nd(3+) emission from 4f2 5d and 4f3 configurations induced by multiphotonic process in YLF, GLF and LLF crystals

    International Nuclear Information System (INIS)

    Librantz, Andre Felipe Henriques

    2000-01-01

    Nd 3+ ultraviolet fluorescence induced by multiphotonic laser excitations was studied in Nd-doped YLiF 4 (YLF) and LuLiF 4 (LLF) crystals by using the time resolved spectroscopy technique. The UV luminescences are due to transitions between the 4f 2 5d and the 4f 3 electronic configurations of Nd 3+ ions. The 4f 2 5d configuration can be reached by direct pumping the UV transition or by multiphotonic excitation, both processes give raise to the UV emission band with a structure due to the strong phonon coupling, expected for a 5d orbital involvement in the transition. The multiphotonic excitation process is due to three photons (532 nm) sequential absorptions of 532 nm-photons by metastable levels of the 4f 3 configuration splitted by crystalline local field. The sequential excitation of Nd by the pumping laser is attributed to the 4 I 9/2 +532nm → 4 G 7/2 ground state absorption followed by the 4 G 7/2 +532 nm →2 F 5/2 and 2 F 5/2 +532 nm → 4f 2 5d excited state absorptions. The UV emissions due to 4f 2 5d configuration are parity allowed, having lifetime of 35 ns in contrast to UV emissions from 4f 3 configuration which are induced by two absorption steps and are parity forbidden showing longer lifetime of 8μs and narrow tines. The polarization effects of the UV emissions were studied and their behavior are dependent on the excited state configuration involving or not the 5d orbital. The allowed UV emissions positions were affected by the host variation more than the ones originating from the 4f 3 configuration as expected. The electronic energy of the 4f 2 5d configuration shifts to lower energy when increasing the crystal field. (author)

  6. Nash Game Model for Optimizing Market Strategies, Configuration of Platform Products in a Vendor Managed Inventory (VMI) Supply Chain for a Product Family

    NARCIS (Netherlands)

    Y. Yu (Yugang); G.Q. Huang (George)

    2009-01-01

    textabstractThis paper discusses how a manufacturer and its retailers interact with each other to optimize their product marketing strategies, platform product configuration and inventory policies in a VMI (Vendor Managed Inventory) supply chain. The manufacturer procures raw materials from multiple

  7. Color management: printing processes - opportunities and limitations

    Science.gov (United States)

    Ingram, Samuel T.

    2002-06-01

    Digital tools have impacted traditional methods employed to reproduce color images during the past decade. The shift from a purely photomechanical process in color reproduction to colorimetric reproduction offers tremendous opportunity in the graphic arts industry. But good things do not necessarily come to all in the same package. Printing processes possess different reproduction attributes: tone reproduction, gray balance and color correction requirements are as different as the ingredient sets selected for color reproduction. This paper will provide insight toward understanding advantages and limitations offered by the new digital technologies in printing, publishing and packaging. For the past five years the Clemson University Graphic Communications Department has conducted numerous color projects using the new digital colorimetric tools during the previous decade. Several approaches have been used including experimental research and typical production workflows. The use of colorimetric data in color reproduction has given an opportunity to realize real gains in color use, predictability and consistency. Meeting an image's separation and reproduction requirements for a specified printing process can involve disruption of the anticipated workflow. Understanding the printing process requirements and the fit within the specifications of a colorimetric workflow are critical to the successful adoption of a color managed workflow. The paper will also provide an insight into the issues and challenges experienced with a color managed workflow. The printing processes used include offset litho, narrow and wide-web flexography (paper, liner board, corrugated and film), screen printing (paper board and polycarbonates), and digital imaging with toner, ink and inkjet systems. A proposal for technology integration will be the focus of the presentation drawn from documented experiences in over 300 applications of color management tools. Discussion will include the structure of

  8. Live testing of the SCAT management process

    International Nuclear Information System (INIS)

    Martin, V.; Duhaime, C.; Boule, M.; Lamarche, A.

    2002-01-01

    The techniques developed by Environment Canada's Shoreline Cleanup Assessment Team (SCAT) have become the world standard for consistency in remedial efforts following an oil spill. This paper presented the results of a workshop that was aimed at testing the management process developed by two different agencies, Environment Canada and Eastern Canada Response Corporation (ECRC), following a spill incident in 1999 in which 150 km of Quebec's north shore near Havre-Saint-Pierre was polluted with 49 tonnes of bunker oil 180 from an ore ship. The issues of specific concern included fishing, mollusc harvesting, tourism, hunting and sites of environmental interest in the Mingan National Park. Both agencies realized they had to use the SCAT approach, but for different reasons. Environment Canada had to identify environmental impacts, while ECRC had to plan methods for shoreline treatment. Both agencies had to document the pollution using the SCAT method, therefore, they joined efforts and pooled their expertise to optimize resources. The newly developed management structure was aimed at determining how the SCAT approach should be planned, how the data quality could be secured, and how the information should be managed. The main benefits of the joint structure was a flow chart and description of the different functions, and a list of deliverables to be produced by those in charge of managing the SCAT approach. It was determined that the new management process is efficient. A SCAT assessment and situation report were both produced within a prescribed time frame. Working in partnership allowed participants to acquire a common understanding of the SCAT approach. 2 refs., 2 tabs., 3 figs

  9. Succeeding in process standardization: Explaining the fit with international management strategy

    DEFF Research Database (Denmark)

    Rahimi, Fatemeh; Møller, Charles; Hvam, Lars

    2016-01-01

    Purpose: The purpose of this paper is to explore the fit between process standardization and international management strategy of multinational corporations (MNCs) by assessing the compatibility between process standardization and corporate structural characteristics in terms of asset configuration...... and headquarters-subsidiary relationships. Design/methodology/approach: First, after a literature review on MNCs’ strategy and process standardization, the study suggests two propositions on the fit between corporate international management strategy and process standardization. Second, to empirically examine....../value: The study provides in-depth understanding of how the international management strategy and consequent structural characteristics of MNCs affects process standardization in the course of a global enterprise resource planning implementation. The study proposes conditions of fit for aligning process...

  10. Development of advanced spent fuel management process

    International Nuclear Information System (INIS)

    Park, Seong Won; Shin, Y. J.; Cho, S. H.

    2004-03-01

    The research on spent fuel management focuses on the maximization of the disposal efficiency by a volume reduction, the improvement of the environmental friendliness by the partitioning and transmutation of the long lived nuclides, and the recycling of the spent fuel for an efficient utilization of the uranium source. In the second phase which started in 2001, the performance test of the advanced spent fuel management process consisting of voloxidation, reduction of spent fuel and the lithium recovery process has been completed successfully on a laboratory scale. The world-premier spent fuel reduction hot test of a 5 kgHM/batch has been performed successfully by joint research with Russia and the valuable data on the actinides and FPs material balance and the characteristics of the metal product were obtained with experience to help design an engineering scale reduction system. The electrolytic reduction technology which integrates uranium oxide reduction in a molten LiCl-Li 2 O system and Li 2 O electrolysis is developed and a unique reaction system is also devised. Design data such as the treatment capacity, current density and mass transfer behavior obtained from the performance test of a 5 kgU/batch electrolytic reduction system pave the way for the third phase of the hot cell demonstration of the advanced spent fuel management technology

  11. CONFIGURATION GENERATOR MODEL

    International Nuclear Information System (INIS)

    Alsaed, A.

    2004-01-01

    ''The Disposal Criticality Analysis Methodology Topical Report'' prescribes an approach to the methodology for performing postclosure criticality analyses within the monitored geologic repository at Yucca Mountain, Nevada. An essential component of the methodology is the ''Configuration Generator Model for In-Package Criticality'' that provides a tool to evaluate the probabilities of degraded configurations achieving a critical state. The configuration generator model is a risk-informed, performance-based process for evaluating the criticality potential of degraded configurations in the monitored geologic repository. The method uses event tree methods to define configuration classes derived from criticality scenarios and to identify configuration class characteristics (parameters, ranges, etc.). The probabilities of achieving the various configuration classes are derived in part from probability density functions for degradation parameters. The NRC has issued ''Safety Evaluation Report for Disposal Criticality Analysis Methodology Topical Report, Revision 0''. That report contained 28 open items that required resolution through additional documentation. Of the 28 open items, numbers 5, 6, 9, 10, 18, and 19 were concerned with a previously proposed software approach to the configuration generator methodology and, in particular, the k eff regression analysis associated with the methodology. However, the use of a k eff regression analysis is not part of the current configuration generator methodology and, thus, the referenced open items are no longer considered applicable and will not be further addressed

  12. Investigation of different ethylenediamine-N,N'-disuccinic acid-enhanced washing configurations for remediation of a Cu-contaminated soil: process kinetics and efficiency comparison between single-stage and multi-stage configurations.

    Science.gov (United States)

    Ferraro, Alberto; Fabbricino, Massimiliano; van Hullebusch, Eric D; Esposito, Giovanni

    2017-09-01

    A comparison of Cu extraction yields for three different ethylenediamine-N,N'-disuccinic acid (EDDS)-enhanced washing configurations was performed on a Cu-contaminated soil. Batch experiments were used to simulate a single-stage continuous stirred tank reactor (CSTR) and a multi-stage (side feeding and counter-current) reactor. Single-stage CSTR conditions were simulated for various EDDS:(Cu + Cd + Pb + Co + Ni + Zn) molar ratio (EDDS:M ratio) (from 1 to 30) and liquid to soil (L/S) ratio (from 15 to 45). The highest Cu extraction yield (≃56%) was achieved with EDDS:M = 30. In contrast, a Cu extraction yield decrease was observed with increasing L/S ratio with highest extracted Cu achievement (≃48%) for L/S = 15. Side feeding configuration was tested in four experimental conditions through different fractionation mode of EDDS dose and treatment time at each washing step. Results from the four tests showed all enhanced Cu extraction (maximum values from ≃43 to ≃51%) achieved at lower treatment time and lower EDDS:M molar ratio compared to CSTR configuration with L/S = 25 and EDDS:M = 10. The counter-current washing was carried out through two washing flows achieving a process performance enhancement with 27% increase of extracted Cu compared to single-stage CSTR configuration. Higher Cu extraction percentage (36.8%) was observed in the first washing phase than in the second one (24.7%).

  13. Coping with transition: improving the management process

    International Nuclear Information System (INIS)

    Griffin, J.; McAlister, J.

    1985-01-01

    It goes without saying that the industry is indeed in transition. Not only do expectations from regulators and the public continue to grow in intensity and complexity, but out ability to make appropriate responses seems to be becoming exceedingly more difficult as well. At AP and L, the energy supply department has some 2,000 employees and operates (in addition to providing general office engineering, technical, and administrative support) all of AP and L's power plants. These include two nuclear units and four coal units as well as hydro, oil and gas plants. In January 1984 the company began an effort with our senior departmental management to try and improve the management process itself. The ultimate goal is to create a climate conductive to improved productivity and quality without the initial (and sometimes risky) across-the-board implementation of techniques such as quality circles

  14. Conceptual design of cost-effective and environmentally-friendly configurations for fuel ethanol production from sugarcane by knowledge-based process synthesis.

    Science.gov (United States)

    Sánchez, Óscar J; Cardona, Carlos A

    2012-01-01

    In this work, the hierarchical decomposition methodology was used to conceptually design the production of fuel ethanol from sugarcane. The decomposition of the process into six levels of analysis was carried out. Several options of technological configurations were assessed in each level considering economic and environmental criteria. The most promising alternatives were chosen rejecting the ones with a least favorable performance. Aspen Plus was employed for simulation of each one of the technological configurations studied. Aspen Icarus was used for economic evaluation of each configuration, and WAR algorithm was utilized for calculation of the environmental criterion. The results obtained showed that the most suitable synthesized flowsheet involves the continuous cultivation of Zymomonas mobilis with cane juice as substrate and including cell recycling and the ethanol dehydration by molecular sieves. The proposed strategy demonstrated to be a powerful tool for conceptual design of biotechnological processes considering both techno-economic and environmental indicators. Copyright © 2011 Elsevier Ltd. All rights reserved.

  15. Development of an equipment management model to improve effectiveness of processes

    International Nuclear Information System (INIS)

    Chang, H. S.; Ju, T. Y.; Song, T. Y.

    2012-01-01

    The nuclear industries have developed and are trying to create a performance model to improve effectiveness of the processes implemented at nuclear plants in order to enhance performance. Most high performing nuclear stations seek to continually improve the quality of their operations by identifying and closing important performance gaps. Thus, many utilities have implemented performance models adjusted to their plant's configuration and have instituted policies for such models. KHNP is developing a standard performance model to integrate the engineering processes and to improve the inter-relation among processes. The model, called the Standard Equipment Management Model (SEMM), is under development first by focusing on engineering processes and performance improvement processes related to plant equipment used at the site. This model includes performance indicators for each process that can allow evaluating and comparing the process performance among 21 operating units. The model will later be expanded to incorporate cost and management processes. (authors)

  16. ARTISTIC AND SCIENTIFIC CREATION PROCESS MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Ioan Tudor

    2013-12-01

    Full Text Available Cultural creation is not ex nihilo, but a conversion of old “material” into a new form or a re-signifying, or a new combination of preexisting elements. Art, as well as science, has been characterized as acts of dominating and transforming nature. In art, the process is real and in science it is virtual. This process is characterized by an efficient management of the means of expression which must be subordinated to the message that the piece of art wants to transmit and the scientist exploits facts in order to make them significant as support, expression and exemplification of the laws of nature. There is also an ontogenesis of management: individual evolution which takes place by virtue of a program, thanks to devices with self-regulating capabilities. This aspect may be particularly interesting for cyberneticists. In contemporary civilization the transfer of certain aspects of the creation process to automated machines implies programming, algorithms. Man is an algorithmic being.

  17. Fair process: managing in the knowledge economy.

    Science.gov (United States)

    Kim, W C; Mauborgne, R

    1997-01-01

    Unlike the traditional factors of production--land, labor, and capital--knowledge is a resource that can't be forced out of people. But creating and sharing knowledge is essential to fostering innovation, the key challenge of the knowledge-based economy. To create a climate in which employees volunteer their creativity and expertise, managers need to look beyond the traditional tools at their disposal. They need to build trust. The authors have studied the links between trust, idea sharing, and corporate performance for more than a decade. They have explored the question of why managers of local subsidiaries so often fail to share information with executives at headquarters. They have studied the dynamics of idea sharing in product development teams, joint ventures, supplier partnerships, and corporate transformations. They offer an explanation for why people resist change even when it would benefit them directly. In every case, the decisive factor was what the authors call fair process--fairness in the way a company makes and executes decisions. The elements of fair process are simple: Engage people's input in decisions that directly affect them. Explain why decisions are made the way they are. Make clear what will be expected of employees after the changes are made. Fair process may sound like a soft issue, but it is crucial to building trust and unlocking ideas. Without it, people are apt to withhold their full cooperation and their creativity. The results are costly: ideas that never see daylight and initiatives that are never seized.

  18. Methods of process management in radiology

    International Nuclear Information System (INIS)

    Teichgraeber, U.K.M.; Gillessen, C.; Neumann, F.

    2003-01-01

    The main emphasis in health care has been on quality and availability but increasing cost pressure has made cost efficiency ever more relevant for nurses, technicians, and physicians. Within a hospital, the radiologist considerably influences the patient's length of stay through the availability of service and diagnostic information. Therefore, coordinating and timing radiologic examinations become increasingly more important. Physicians are not taught organizational management during their medical education and residency training, and the necessary expertise in economics is generally acquired through the literature or specialized courses. Beyond the medical service, the physicians are increasingly required to optimize their work flow according to economic factors. This review introduces various tools for process management and its application in radiology. By means of simple paper-based methods, the work flow of most processes can be analyzed. For more complex work flow, it is suggested to choose a method that allows for an exact qualitative and quantitative prediction of the effect of variations. This review introduces network planning technique and process simulation. (orig.) [de

  19. The Management of Law Firms Using Business Process Management, Document Management and Web Services Integration

    OpenAIRE

    Roxana Maria Petculet

    2012-01-01

    The aim of this paper is to present the technical solution implemented in the present context for the management of law firms. The informational system consists of the automation of business processes using a BPM engine and electronic archiving using a DMS. The communication between the two modules is made by invoking web services. The whole system integrates modules like: project management, contract management, invoice management, collection, CRM, reporting.

  20. The ATLAS Data Management Software Engineering Process

    CERN Document Server

    Lassnig, M; The ATLAS collaboration; Stewart, G A; Barisits, M; Beermann, T; Vigne, R; Serfon, C; Goossens, L; Nairz, A; Molfetas, A

    2014-01-01

    Rucio is the next-generation data management system of the ATLAS experiment. The software engineering process to develop Rucio is fundamentally different to existing software development approaches in the ATLAS distributed computing community. Based on a conceptual design document, development takes place using peer-reviewed code in a test-driven environment. The main objectives are to ensure that every engineer understands the details of the full project, even components usually not touched by them, that the design and architecture are coherent, that temporary contributors can be productive without delay, that programming mistakes are prevented before being committed to the source code, and that the source is always in a fully functioning state. This contribution will illustrate the workflows and products used, and demonstrate the typical development cycle of a component from inception to deployment within this software engineering process. Next to the technological advantages, this contribution will also hi...

  1. The ATLAS Data Management Software Engineering Process

    CERN Document Server

    Lassnig, M; The ATLAS collaboration; Stewart, G A; Barisits, M; Beermann, T; Vigne, R; Serfon, C; Goossens, L; Nairz, A

    2013-01-01

    Rucio is the next-generation data management system of the ATLAS experiment. The software engineering process to develop Rucio is fundamentally different to existing software development approaches in the ATLAS distributed computing community. Based on a conceptual design document, development takes place using peer-reviewed code in a test-driven environment. The main objectives are to ensure that every engineer understands the details of the full project, even components usually not touched by them, that the design and architecture are coherent, that temporary contributors can be productive without delay, that programming mistakes are prevented before being committed to the source code, and that the source is always in a fully functioning state. This contribution will illustrate the workflows and products used, and demonstrate the typical development cycle of a component from inception to deployment within this software engineering process. Next to the technological advantages, this contribution will also hi...

  2. Development of advanced spent fuel management process

    International Nuclear Information System (INIS)

    Ro, Seung Gy; Shin, Y. J.; Do, J. B.; You, G. S.; Seo, J. S.; Lee, H. G.

    1998-03-01

    This study is to develop an advanced spent fuel management process for countries which have not yet decided a back-end nuclear fuel cycle policy. The aims of this process development based on the pyroreduction technology of PWR spent fuels with molten lithium, are to reduce the storage volume by a quarter and to reduce the storage cooling load in half by the preferential removal of highly radioactive decay-heat elements such as Cs-137 and Sr-90 only. From the experimental results which confirm the feasibility of metallization technology, it is concluded that there are no problems in aspects of reaction kinetics and equilibrium. However, the operating performance test of each equipment on an engineering scale still remain and will be conducted in 1999. (author). 21 refs., 45 tabs., 119 figs

  3. Improving the Customer Configuration Update Process by Explicitly Managing Software Knowledge

    NARCIS (Netherlands)

    Slinger, S.R.L.

    2006-01-01

    The implementation and continuous support of a software product at a customer with evolving requirements is a complex task for a product software vendor. There are many customers for the vendor to serve, all of whom might require their own version or variant of the application. Furthermore, the

  4. The NASA Continuous Risk Management Process

    Science.gov (United States)

    Pokorny, Frank M.

    2004-01-01

    As an intern this summer in the GRC Risk Management Office, I have become familiar with the NASA Continuous Risk Management Process. In this process, risk is considered in terms of the probability that an undesired event will occur and the impact of the event, should it occur (ref., NASA-NPG: 7120.5). Risk management belongs in every part of every project and should be ongoing from start to finish. Another key point is that a risk is not a problem until it has happened. With that in mind, there is a six step cycle for continuous risk management that prevents risks from becoming problems. The steps are: identify, analyze, plan, track, control, and communicate & document. Incorporated in the first step are several methods to identify risks such as brainstorming and using lessons learned. Once a risk is identified, a risk statement is made on a risk information sheet consisting of a single condition and one or more consequences. There can also be a context section where the risk is explained in more detail. Additionally there are three main goals of analyzing a risk, which are evaluate, classify, and prioritize. Here is where a value is given to the attributes of a risk &e., probability, impact, and timeframe) based on a multi-level classification system (e.g., low, medium, high). It is important to keep in mind that the definitions of these levels are probably different for each project. Furthermore the risks can be combined into groups. Then, the risks are prioritized to see what risk is necessary to mitigate first. After the risks are analyzed, a plan is made to mitigate as many risks as feasible. Each risk should be assigned to someone in the project with knowledge in the area of the risk. Then the possible approaches to choose from are: research, accept, watch, or mitigate. Next, all risks, mitigated or not, are tracked either individually or in groups. As the plan is executed, risks are re-evaluated, and the attribute values are adjusted as necessary. Metrics

  5. Integrating risk management into the baselining process

    International Nuclear Information System (INIS)

    Jennett, N.; Tonkinson, A.

    1994-01-01

    These processes work together in building the project (comprised of the technical, schedule, and cost baselines) against which performance is measured and changes to the scope, schedule and cost of a project are managed and controlled. Risk analysis is often performed as the final element of the scheduling or estimating processes, a precursor to establishing cost and schedule contingency. However, best business practices dictate that information that may be crucial to the success of a project be analyzed and incorporated into project planning as soon as it is available and usable. The purpose or risk management is not to eliminate risk. Neither is it intended to suggest wholesale re-estimating and re-scheduling of a project. Rather, the intent is to make provisions to reduce and control the schedule and/or cost ramifications of risk by anticipating events and conditions that cannot be reliably planned for and which have the potential to negatively impact accomplishment of the technical objectives and requirements of the project

  6. Development of Advanced Spent Fuel Management Process

    Energy Technology Data Exchange (ETDEWEB)

    Seo, Chung Seok; Choi, I. K.; Kwon, S. G. (and others)

    2007-06-15

    As a part of research efforts to develop an advanced spent fuel management process, this project focused on the electrochemical reduction technology which can replace the original Li reduction technology of ANL, and we have successfully built a 20 kgHM/batch scale demonstration system. The performance tests of the system in the ACPF hot cell showed more than a 99% reduction yield of SIMFUEL, a current density of 100 mA/cm{sup 2} and a current efficiency of 80%. For an optimization of the process, the prevention of a voltage drop in an integrated cathode, a minimization of the anodic effect and an improvement of the hot cell operability by a modulation and simplization of the unit apparatuses were achieved. Basic research using a bench-scale system was also carried out by focusing on a measurement of the electrochemical reduction rate of the surrogates, an elucidation of the reaction mechanism, collecting data on the partition coefficients of the major nuclides, quantitative measurement of mass transfer rates and diffusion coefficients of oxygen and metal ions in molten salts. When compared to the PYROX process of INL, the electrochemical reduction system developed in this project has comparative advantages in its application of a flexible reaction mechanism, relatively short reaction times and increased process yields.

  7. Development of Advanced Spent Fuel Management Process

    International Nuclear Information System (INIS)

    Seo, Chung Seok; Choi, I. K.; Kwon, S. G.

    2007-06-01

    As a part of research efforts to develop an advanced spent fuel management process, this project focused on the electrochemical reduction technology which can replace the original Li reduction technology of ANL, and we have successfully built a 20 kgHM/batch scale demonstration system. The performance tests of the system in the ACPF hot cell showed more than a 99% reduction yield of SIMFUEL, a current density of 100 mA/cm 2 and a current efficiency of 80%. For an optimization of the process, the prevention of a voltage drop in an integrated cathode, a minimization of the anodic effect and an improvement of the hot cell operability by a modulation and simplization of the unit apparatuses were achieved. Basic research using a bench-scale system was also carried out by focusing on a measurement of the electrochemical reduction rate of the surrogates, an elucidation of the reaction mechanism, collecting data on the partition coefficients of the major nuclides, quantitative measurement of mass transfer rates and diffusion coefficients of oxygen and metal ions in molten salts. When compared to the PYROX process of INL, the electrochemical reduction system developed in this project has comparative advantages in its application of a flexible reaction mechanism, relatively short reaction times and increased process yields

  8. Supply chain configuration with co-ordinated product, process and logistics decisions : an approach based on Petri nets

    NARCIS (Netherlands)

    Zhang, Lianfeng (Linda); You, Xiao; Jiao, Jianxin (Roger); Helo, Petri

    2009-01-01

    Supply chain configuration lends itself to be an effective means to deal with product differentiation and customisation throughout a supply chain network. It essentially entails the instantiation of a generic supply chain network to specific supply chains in accordance with diverse customer

  9. Optimization of process parameter and reformer configuration for hydrogen production from steam reforming of heavy hydrocarbons. Paper no. IGEC-1-079

    International Nuclear Information System (INIS)

    Chen, Z.; Elnashaie, S.E.H.

    2005-01-01

    The present optimization investigation is classified into reforming configuration optimization in one hand and parameter optimization of each configuration on the other hand. Heptane is used as a model component for heavy hydrocarbons. The proposed novel reforming process is basically a Circulating Fluidized-Bed Membrane Reformer (CFBMR) with continuous catalyst regeneration and gas-solid separation. Composite hydrogen selective membranes are used for removing the product hydrogen from the reacting gas mixture and therefore driving the reversible reactions beyond their thermodynamic equilibriums. Dense perovskite oxygen selective membranes are also used to introduce oxygen for the exothermic oxidation of hydrocarbons and carbon. Four configurations are investigated, two of them are with the catalyst regeneration before the gas-solid separation and the other two are with the catalyst regeneration after the gas-solid separation. The optimization of the performance of each configuration is carried out for a number of design and operating parameters as optimization parameters and under both non-autothermal and autothermal reforming conditions. Results show that the autothermal operation with direct contact between cold feeds (water and heptane) and hot circulating catalyst can be the best configuration for efficient hydrogen production with minimum energy consumption. The maximum net hydrogen yield is 16.732 moles of hydrogen per mole of heptane fed, which is 76.05% of the maximum theoretical hydrogen yield of 22. (author)

  10. 23 CFR 450.320 - Congestion management process in transportation management areas.

    Science.gov (United States)

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Congestion management process in transportation... Programming § 450.320 Congestion management process in transportation management areas. (a) The transportation planning process in a TMA shall address congestion management through a process that provides for safe and...

  11. Business process of reputation management of food industry enterprises

    OpenAIRE

    Derevianko Olena. H.

    2014-01-01

    The goal of the article is development of the methodical base of reputation management directed at formalisation of theoretical provisions and explanation how to organise reputation management at food industry enterprises. The article shows prospectiveness of use of the Business Process Management concept in reputation management. Using the diagram of the Reputation Management business process environment the article shows its key participants (suppliers and clients of the business process) a...

  12. Initial perspectives on process threat management

    International Nuclear Information System (INIS)

    Whiteley, James R. Rob; Mannan, M. Sam

    2004-01-01

    Terrorist and criminal acts are now considered credible risks in the process industries. Deliberate attacks on the nation's petroleum refineries and chemical plants would pose a significant threat to public welfare, national security, and the US economy. To-date, the primary response of government and industry has been on improved security to prevent attacks and the associated consequences. While prevention is clearly preferred, the potential for successful attacks must be addressed. If plant security is breached, the extent of the inflicted damage is determined by the available plant safety systems and procedures. We refer to this 'inside the gate' response as process threat management. The authors have initiated a joint industry/academia study to address: - the level of safety provided by existing plant equipment and safety systems in response to a terrorist act, and; - identification of process (rather than security) needs or opportunities to address this new safety concern. This paper describes the initial perspectives and issues identified by the team at the beginning of the study

  13. Management of investment processes on Finnish farms

    Directory of Open Access Journals (Sweden)

    T. MATTILA

    2008-12-01

    Full Text Available Structural change in agriculture means a continuous need for investing in farm production. It is essential for the sustainable operations and the economy of the farm that such investments are successful. In this research, different stages of the investment process of farms were studied as well as the use of information and the success perceived during the investment process. The study was carried out with mail surveys and telephone interviews on the Finnish Farm Accountancy Data Network (FADN farms. The most challenging investments were in animal husbandry buildings and, as to these investments, the comparison of alternatives was the most challenging stage. For most investments, the planning phase was considered more challenging than the implementation. Before making the decision, farmers acquired information from many sources, of which the opinion of the main customer and the experiences of fellow farmers were the most valued. Some of the products considered were so new on the market that it was not easy to get adequate information and, furthermore, the information given by suppliers was not always accurate. Decision-making was supported by calculations, but qualitative factors had a dominating role. Large basic decisions were made relatively quickly, while details needed a longer time to process. In general, farm managers were satisfied with their investments. Improvements in work quality and quantity were especially mentioned and generally qualitative factors were the ones first in mind when evaluating the successfulness of the investment.;

  14. Software Process Improvement Journey: IBM Australia Application Management Services

    Science.gov (United States)

    2005-03-01

    See Section 5.1.2) - Client Relationship Management ( CRM ) processes-specifically, Solution Design and Solution Delivery - Worldwide Project Management ...plex systems life-cycle management , rapid solutions development, custom development, package selection and implementation, maintenance, minor...CarnegieMellon ___ Software Engineering Institute Software Process Improvement Journey: IBM Australia Application Management Services Robyn Nichols

  15. [Process orientation as a tool of strategic approaches to corporate governance and integrated management systems].

    Science.gov (United States)

    Sens, Brigitte

    2010-01-01

    The concept of general process orientation as an instrument of organisation development is the core principle of quality management philosophy, i.e. the learning organisation. Accordingly, prestigious quality awards and certification systems focus on process configuration and continual improvement. In German health care organisations, particularly in hospitals, this general process orientation has not been widely implemented yet - despite enormous change dynamics and the requirements of both quality and economic efficiency of health care processes. But based on a consistent process architecture that considers key processes as well as management and support processes, the strategy of excellent health service provision including quality, safety and transparency can be realised in daily operative work. The core elements of quality (e.g., evidence-based medicine), patient safety and risk management, environmental management, health and safety at work can be embedded in daily health care processes as an integrated management system (the "all in one system" principle). Sustainable advantages and benefits for patients, staff, and the organisation will result: stable, high-quality, efficient, and indicator-based health care processes. Hospitals with their broad variety of complex health care procedures should now exploit the full potential of total process orientation. Copyright © 2010. Published by Elsevier GmbH.

  16. Space shuttle configuration accounting functional design specification

    Science.gov (United States)

    1974-01-01

    An analysis is presented of the requirements for an on-line automated system which must be capable of tracking the status of requirements and engineering changes and of providing accurate and timely records. The functional design specification provides the definition, description, and character length of the required data elements and the interrelationship of data elements to adequately track, display, and report the status of active configuration changes. As changes to the space shuttle program levels II and III configuration are proposed, evaluated, and dispositioned, it is the function of the configuration management office to maintain records regarding changes to the baseline and to track and report the status of those changes. The configuration accounting system will consist of a combination of computers, computer terminals, software, and procedures, all of which are designed to store, retrieve, display, and process information required to track proposed and proved engineering changes to maintain baseline documentation of the space shuttle program levels II and III.

  17. The improving processes in the human resources management

    OpenAIRE

    Darja Holátová

    2002-01-01

    The quality management of the human resources management, the quality of the products, services and prosperities of the firms is among others dependent on the quality management. Managers convey a leadership and commitment necessary for creating the environment for quality improvement. The managers are responsible for their own actions, development and improvement of their own work processes.

  18. Organizational agility key factors for dynamic business process management

    OpenAIRE

    Triaa , Wafa; Gzara , Lilia; Verjus , Hervé

    2016-01-01

    International audience; For several years, Business Process Management (BPM) is recognized as a holistic management approach that promotes business effectiveness and efficiency. Increasingly, corporates find themselves, operating in business environments filled with unpredictable, complex and continuous change. Driven by these dynamic competitive conditions, they look for a dynamic management of their business processes to maintain their processes performance. To be competitive, companies hav...

  19. 49 CFR 659.31 - Hazard management process.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Hazard management process. 659.31 Section 659.31... Agency § 659.31 Hazard management process. (a) The oversight agency must require the rail transit agency..., operational changes, or other changes within the rail transit environment. (b) The hazard management process...

  20. 76 FR 57723 - Electricity Sector Cybersecurity Risk Management Process Guideline

    Science.gov (United States)

    2011-09-16

    ... DEPARTMENT OF ENERGY Electricity Sector Cybersecurity Risk Management Process Guideline AGENCY... public comment on DOE's intent to publish the Electricity Sector Cybersecurity Risk Management Process Guideline. The guideline describes a risk management process that is targeted to the specific needs of...

  1. Configuration Control Office

    CERN Multimedia

    Beltramello, O

    In order to enable Technical Coordination to manage the detector configuration and to be aware of all changes in this configuration, a baseline of the envelopes has been created in April 2001. Fifteen system and multi-system envelope drawings have been approved and baselined. An EDMS file is associated with each approved envelope, which provides a list of the current known unsolved conflicts related to the envelope and a list of remaining drawing inconsistencies to be corrected. The envelope status with the associated drawings and EDMS file can be found on the web at this adress: http://atlasinfo.cern.ch/Atlas/TCOORD/Activities/Installation/Configuration/ Any modification in the baseline has to be requested via the Engineering Change Requests. The procedure can be found under: http://atlasinfo.cern.ch/Atlas/TCOORD/Activities/TcOffice/Quality/ECR/ TC will review all the systems envelopes in the near future and manage conflict resolution with the collaboration of the systems.

  2. The ATLAS data management software engineering process

    International Nuclear Information System (INIS)

    Lassnig, M; Garonne, V; Stewart, G A; Barisits, M; Serfon, C; Goossens, L; Nairz, A; Beermann, T; Vigne, R; Molfetas, A

    2014-01-01

    Rucio is the next-generation data management system of the ATLAS experiment. The software engineering process to develop Rucio is fundamentally different to existing software development approaches in the ATLAS distributed computing community. Based on a conceptual design document, development takes place using peer-reviewed code in a test-driven environment. The main objectives are to ensure that every engineer understands the details of the full project, even components usually not touched by them, that the design and architecture are coherent, that temporary contributors can be productive without delay, that programming mistakes are prevented before being committed to the source code, and that the source is always in a fully functioning state. This contribution will illustrate the workflows and products used, and demonstrate the typical development cycle of a component from inception to deployment within this software engineering process. Next to the technological advantages, this contribution will also highlight the social aspects of an environment where every action is subject to detailed scrutiny.

  3. The ATLAS data management software engineering process

    Science.gov (United States)

    Lassnig, M.; Garonne, V.; Stewart, G. A.; Barisits, M.; Beermann, T.; Vigne, R.; Serfon, C.; Goossens, L.; Nairz, A.; Molfetas, A.; Atlas Collaboration

    2014-06-01

    Rucio is the next-generation data management system of the ATLAS experiment. The software engineering process to develop Rucio is fundamentally different to existing software development approaches in the ATLAS distributed computing community. Based on a conceptual design document, development takes place using peer-reviewed code in a test-driven environment. The main objectives are to ensure that every engineer understands the details of the full project, even components usually not touched by them, that the design and architecture are coherent, that temporary contributors can be productive without delay, that programming mistakes are prevented before being committed to the source code, and that the source is always in a fully functioning state. This contribution will illustrate the workflows and products used, and demonstrate the typical development cycle of a component from inception to deployment within this software engineering process. Next to the technological advantages, this contribution will also highlight the social aspects of an environment where every action is subject to detailed scrutiny.

  4. Situational Script Management of Business Processes with Changeable Structure

    OpenAIRE

    Chaliy, Sergey; Chala, Oksana

    2008-01-01

    In the presented work the problem of management business-processes with changeable structure is considered and situational based approach to its decision is offered. The approach is based on situational model of management business-process according to which process is represented as a set of situations. The script defining necessary actions is connected with each situation. Management of process is carried out by means of the rules formalizing functional requirements to processes.

  5. Torrefaction Processing for Human Solid Waste Management

    Science.gov (United States)

    Serio, Michael A.; Cosgrove, Joseph E.; Wójtowicz, Marek A.; Stapleton, Thomas J.; Nalette, Tim A.; Ewert, Michael K.; Lee, Jeffrey; Fisher, John

    2016-01-01

    This study involved a torrefaction (mild pyrolysis) processing approach that could be used to sterilize feces and produce a stable, odor-free solid product that can be stored or recycled, and also to simultaneously recover moisture. It was demonstrated that mild heating (200-250 C) in nitrogen or air was adequate for torrefaction of a fecal simulant and an analog of human solid waste (canine feces). The net result was a nearly undetectable odor (for the canine feces), complete recovery of moisture, some additional water production, a modest reduction of the dry solid mass, and the production of small amounts of gas and liquid. The liquid product is mainly water, with a small Total Organic Carbon content. The amount of solid vs gas plus liquid products can be controlled by adjusting the torrefaction conditions (final temperature, holding time), and the current work has shown that the benefits of torrefaction could be achieved in a low temperature range (< 250 C). These temperatures are compatible with the PTFE bag materials historically used by NASA for fecal waste containment and will reduce the energy consumption of the process. The solid product was a dry material that did not support bacterial growth and was hydrophobic relative to the starting material. In the case of canine feces, the solid product was a mechanically friable material that could be easily compacted to a significantly smaller volume (approx. 50%). The proposed Torrefaction Processing Unit (TPU) would be designed to be compatible with the Universal Waste Management System (UWMS), now under development by NASA. A stand-alone TPU could be used to treat the canister from the UWMS, along with other types of wet solid wastes, with either conventional or microwave heating. Over time, a more complete integration of the TPU and the UWMS could be achieved, but will require design changes in both units.

  6. Overview of an energy management process

    International Nuclear Information System (INIS)

    Chantraine, P.

    2004-01-01

    Invista is a global and vertically integrated fiber, resin and intermediates business which belonged to Dupont but is now a subsidiary of Koch Industries. A background of Invista and its former relationship with Dupont was presented. This presentation was based on goals and work done as Dupont Canada Inc., up to the end of 2003. Details of Invista's approach to climate change in Canada were provided along with the company's relationship with Natural Resources Canada. The historical position of Dupont Canada was reviewed in detail, including their commitment to voluntary approach; participation in the national process; their goal of 85 per cent reduction in greenhouse gas (GHG) by 2000; 93 per cent reduction in nitrous oxide emissions; energy efficiency goals; and continuing growth of the company. An outline and mission of the energy management team established in 1974 was presented, with details of the 1974 oil shortage, stabilization in the 1980s through to rises in electricity prices in the 1990s and concerns over climate change in recent years. Details of the team's operational procedures were presented. Results were presented in graph form and include: total energy use from 1972 to 2003 as well as cumulative energy conservation projects and resulting energy savings. Examples of activities and projects were provided, including details of energy performance contracting. It was concluded that in order to conserve energy, top management support was necessary, as well as passion and dedication in both leaders and teams. A broad scope for creativity in finding solutions within evolving constraints was also important, as was the nurturing of capability, capacity and recognition for results achieved. tabs., figs

  7. Processes, Performance Drivers and ICT Tools in Human Resources Management

    OpenAIRE

    Oškrdal Václav; Pavlíček Antonín; Jelínková Petra

    2011-01-01

    This article presents an insight to processes, performance drivers and ICT tools in human resources (HR) management area. On the basis of a modern approach to HR management, a set of business processes that are handled by today’s HR managers is defined. Consequently, the concept of ICT-supported performance drivers and their relevance in the area of HR management as well as the relationship between HR business processes, performance drivers and ICT tools are defined. The theoretical outcomes ...

  8. On Representing Instance Changes in Adaptive Process Management Systems.

    NARCIS (Netherlands)

    Rinderle, S.B.; Kreher, U; Lauer, M.; Dadam, P.; Reichert, M.U.

    2006-01-01

    By separating the process logic from the application code process management systems (PMS) offer promising perspectives for automation and management of business processes. However, the added value of PMS strongly depends on their ability to support business process changes which can affect the

  9. Understanding and Managing the Assessment Process

    Science.gov (United States)

    Gene Lessard; Scott Archer; John R. Probst; Sandra Clark

    1999-01-01

    Taking an ecological approach to management, or ecosystem management, is a developing approach for managing natural resources within the context of large geogaphic scales and over multiple time frames. Recently, the Council on Environmental Quality (CEQ) (IEMTF 1995) defined an ecosystem as "...an interconnected community of living things, including humans, and...

  10. Integrating the autonomous subsystems management process

    Science.gov (United States)

    Ashworth, Barry R.

    1992-01-01

    Ways in which the ranking of the Space Station Module Power Management and Distribution testbed may be achieved and an individual subsystem's internal priorities may be managed within the complete system are examined. The application of these results in the integration and performance leveling of the autonomously managed system is discussed.

  11. A Novel Process Configuration for Anaerobic Digestion of Source-Sorted Household Waste Using Hyper-Thermophilic Post-Treatment

    DEFF Research Database (Denmark)

    Hartmann, H.; Ahring, Birgitte Kiær

    2005-01-01

    A novel reactor configuration was investigated for anaerobic digestion (AD) of the organic fraction of municipal solid waste (OFMSW). An anaerobic hyper-thermophilic (68°C) reactor R68 was implemented as a post–treatment step for the effluent of a thermophilic reactor R1 (55°C) in order to enhance...... hydrolysis of recalcitrant organic matter, improve sanitation and ease the stripping of ammonia from the reactor. The efficiency of the combined system was studied in terms of methane yield, volatile solids (VS) reduction and volatile fatty acid (VFA) production at different hydraulic retention times (HRT...

  12. Business process of reputation management of food industry enterprises

    Directory of Open Access Journals (Sweden)

    Derevianko Olena. H.

    2014-01-01

    Full Text Available The goal of the article is development of the methodical base of reputation management directed at formalisation of theoretical provisions and explanation how to organise reputation management at food industry enterprises. The article shows prospectiveness of use of the Business Process Management concept in reputation management. Using the diagram of the Reputation Management business process environment the article shows its key participants (suppliers and clients of the business process and identifies their place in formation of the enterprise reputation. It also shows that the reputation management should be considered a business process of the highest level of management. Construction of the flow structure of the Reputation Management business process allows uncovering the logic of interrelation of inlets and outlets within the framework of the specified main stages of the business process: assessment of the current state of reputation, collection of information about stakeholders, identification of PR strategy goals, planning of necessary resources, realisation of the PR strategy, assessment of efficiency and process monitoring. The article offers the flow, functional and organisational structures of the Reputation Management business process for food industry enterprises. Moreover, justification of functional and organisational structures of the Reputation Management business process gives a possibility to distribute functions of reputation management between specific executors and establish responsibility for each stage of the business process.

  13. Natural language processing and advanced information management

    Science.gov (United States)

    Hoard, James E.

    1989-01-01

    Integrating diverse information sources and application software in a principled and general manner will require a very capable advanced information management (AIM) system. In particular, such a system will need a comprehensive addressing scheme to locate the material in its docuverse. It will also need a natural language processing (NLP) system of great sophistication. It seems that the NLP system must serve three functions. First, it provides an natural language interface (NLI) for the users. Second, it serves as the core component that understands and makes use of the real-world interpretations (RWIs) contained in the docuverse. Third, it enables the reasoning specialists (RSs) to arrive at conclusions that can be transformed into procedures that will satisfy the users' requests. The best candidate for an intelligent agent that can satisfactorily make use of RSs and transform documents (TDs) appears to be an object oriented data base (OODB). OODBs have, apparently, an inherent capacity to use the large numbers of RSs and TDs that will be required by an AIM system and an inherent capacity to use them in an effective way.

  14. Study on a Process-oriented Knowledge Management Model

    OpenAIRE

    Zhang, Lingling; Li, Jun; Zheng, Xiuyu; Li, Xingsen; Shi, Yong

    2007-01-01

    Now knowledge has become the most important resource of enterprises. Process-oriented knowledge management (POKM) is a new and valuable research field. It may be the most practical method to deal with difficulties in knowledge management. The paper analyzes background, hypothesis and proposes of POKM, define the process knowledge, and give a process-oriented knowledge management model. The model integrates knowledge, process, human, and technology. It can improve the decision support capabili...

  15. A Practical Decision-Analysis Process for Forest Ecosystem Management

    Science.gov (United States)

    H. Michael Rauscher; F. Thomas Lloyd; David L. Loftis; Mark J. Twery

    2000-01-01

    Many authors have pointed out the need to firm up the 'fuzzy' ecosystem management paradigm and develop operationally practical processes to allow forest managers to accommodate more effectively the continuing rapid change in societal perspectives and goals. There are three spatial scales where clear, precise, practical ecosystem management processes are...

  16. BUSINESS PROCESSES TRANSFORMATION IN THE METHODOLOGY OF MULTILEVEL FINANCIAL MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Andrey G. Mikheev

    2016-01-01

    Full Text Available The article discusses the application of process approach to financial management. The multilevel financial management methodology is described. It is based on the delegation of the financial management functions in the downstream division of the organization, process automation, transfer of financial resources between units of different levels of the hierarchical structure of the credit institution, the implementation of a financial management mechanism of the process approach, execution of business processes in the computer environment, using the strategic management of the organization by changing the coefficients, which are the parameters of decentralized control mechanism, using the construction of the «fast» financial indicators, taking into account the terms of financial resources transfer transactions and effective transformation of business processes. The article is focused on the credit institution business management through the application of process transformation to transfer funds business processes.

  17. Integration mockup and process material management system

    Science.gov (United States)

    Verble, Adas James, Jr.

    1992-01-01

    Work to define and develop a full scale Space Station Freedom (SSF) mockup with the flexibility to evolve into future designs, to validate techniques for maintenance and logistics and verify human task allocations and support trade studies is described. This work began in early 1985 and ended in August, 1991. The mockups are presently being used at MSFC in Building 4755 as a technology and design testbed, as well as for public display. Micro Craft also began work on the Process Material Management System (PMMS) under this contract. The PMMS simulator was a sealed enclosure for testing to identify liquids, gaseous, particulate samples, and specimen including, urine, waste water, condensate, hazardous gases, surrogate gasses, liquids, and solids. The SSF would require many trade studies to validate techniques for maintenance and logistics and verify system task allocations; it was necessary to develop a full scale mockup which would be representative of current SSF design with the ease of changing those designs as the SSF design evolved and changed. The tasks defined for Micro Craft were to provide the personnel, services, tools, and materials for the SSF mockup which would consist of four modules, nodes, interior components, and part task mockups of MSFC responsible engineering systems. This included the Engineering Control and Life Support Systems (ECLSS) testbed. For the initial study, the mockups were low fidelity, soft mockups of graphics art bottle, and other low cost materials, which evolved into higher fidelity mockups as the R&D design evolved, by modifying or rebuilding, an important cost saving factor in the design process. We designed, fabricated, and maintained the full size mockup shells and support stands. The shells consisted of cylinders, end cones, rings, longerons, docking ports, crew airlocks, and windows. The ECLSS required a heavier cylinder to support the ECLSS systems test program. Details of this activity will be covered. Support stands were

  18. Integrated water management system - Description and test results. [for Space Station waste water processing

    Science.gov (United States)

    Elden, N. C.; Winkler, H. E.; Price, D. F.; Reysa, R. P.

    1983-01-01

    Water recovery subsystems are being tested at the NASA Lyndon B. Johnson Space Center for Space Station use to process waste water generated from urine and wash water collection facilities. These subsystems are being integrated into a water management system that will incorporate wash water and urine processing through the use of hyperfiltration and vapor compression distillation subsystems. Other hardware in the water management system includes a whole body shower, a clothes washing facility, a urine collection and pretreatment unit, a recovered water post-treatment system, and a water quality monitor. This paper describes the integrated test configuration, pertinent performance data, and feasibility and design compatibility conclusions of the integrated water management system.

  19. Managing Change in Software Process Improvement

    DEFF Research Database (Denmark)

    Mathiassen, Lars; Ngwenyama, Ojelanki K.; Aaen, Ivan

    2005-01-01

    When software managers initiate SPI, most are ill prepared for the scale and complexity of the organizational change involved. Although they typically know how to deal with large software projects, few managers have sufficient experience with projects that transform organizations. To succeed with...

  20. Computerizing Maintenance Management Improves School Processes.

    Science.gov (United States)

    Conroy, Pat

    2002-01-01

    Describes how a Computerized Maintenance Management System (CMMS), a centralized maintenance operations database that facilitates work order procedures and staff directives, can help individual school campuses and school districts to manage maintenance. Presents the benefits of CMMS and things to consider in CMMS selection. (EV)

  1. Managing Automation: A Process, Not a Project.

    Science.gov (United States)

    Hoffmann, Ellen

    1988-01-01

    Discussion of issues in management of library automation includes: (1) hardware, including systems growth and contracts; (2) software changes, vendor relations, local systems, and microcomputer software; (3) item and authority databases; (4) automation and library staff, organizational structure, and managing change; and (5) environmental issues,…

  2. Investigating the success of operational business process management systems

    NARCIS (Netherlands)

    Poelmans, S.; Reijers, H.A.; Recker, J.

    2013-01-01

    Business process management systems (BPMS) belong to a class of enterprise information systems that are characterized by the dependence on explicitly modeled process logic. Through the process logic, it is relatively easy to manage explicitly the routing and allocation of work items along a business

  3. Survey process quality: a question of healthcare manager approach.

    Science.gov (United States)

    Nilsson, Petra; Blomqvist, Kerstin

    2017-08-14

    Purpose The purpose of this paper is to explore how healthcare first-line managers think about and act regarding workplace survey processes. Design/methodology/approach This interview study was performed at a hospital in south Sweden. First-line healthcare managers ( n=24) volunteered. The analysis was inspired by phenomenography, which aims to describe the ways in which different people experience a phenomenon. The phenomenon was a workplace health promotion (WHP) survey processes. Findings Four main WHP survey process approaches were identified among the managers: as a possibility, as a competition, as a work task among others and as an imposition. For each, three common subcategories emerged; how managers: stated challenges and support from hospital management; described their own work group and collaboration with other managers; and expressed themselves and their situation in their roles as first-line managers. Practical implications Insights into how hospital management can understand their first-line managers' motivation for survey processes and practical suggestions and how managers can work proactively at organizational, group and individual level are presented. Originality/value Usually these studies focus on those who should respond to a survey; not those who should run the survey process. Focusing on managers and not co-workers can lead to more committed and empowered managers and thereby success in survey processes.

  4. Framework for Knowledge Management Processes in Supply Chain

    Directory of Open Access Journals (Sweden)

    Mohsen Shafiei Nikabadi

    2014-02-01

    The innovation aspect of the research is to provide a comprehensive framework for knowledge management processes in supply chain of automotive industry with main indicators for each process. Several investigations have been made for knowledge management but specific research on knowledge management processes in the supply chain has not been observed. Thus providing the framework and indicators for each component of the framework is the innovation of the research

  5. Ergonomics Integration Omproving Production Process Management in Enterprises of Latvia

    OpenAIRE

    Henrijs Kaļķis

    2013-01-01

    Dotoral thesis ERGONOMICS INTEGRATION IMPROVING PRODUCTION PROCESS MANAGEMENT IN ENTERPRISES OF LATVIA ANNOTATION Ergonomics integration in process management has great significance in organisations` growth of productivity. It is a new approach to entrepreneurship and business strategy, where ergonomic aspects and values are taken into account in ensuring the effective process management and profitability of enterprises. This study is aimed at solution of the problem of e...

  6. Education management process implementation of reforms

    Directory of Open Access Journals (Sweden)

    A. V. Kondratyeva

    2013-12-01

    In the dissertation research looks at the problem of the study. This article contains material research and evaluate different points of view on the issue of a systematic approach using educational management in the implementation of reforms.

  7. RISK MANAGEMENT MECHANISM OF GRAIN PROCESSING ENTERPRISES

    Directory of Open Access Journals (Sweden)

    I. P. Bogomolova

    2013-01-01

    Full Text Available In article the main characteristics of a control system by risks (the purpose, properties, the principles, requirements are defined, and also the possible mechanism of risk management of the flour-grinding enterprises is considered.

  8. Total Ore Processing Integration and Management

    Energy Technology Data Exchange (ETDEWEB)

    Leslie Gertsch

    2006-05-15

    This report outlines the technical progress achieved for project DE-FC26-03NT41785 (Total Ore Processing Integration and Management) during the period 01 January through 31 March of 2006. (1) Work in Progress: Minntac Mine--Graphical analysis of drill monitor data moved from two-dimensional horizontal patterns to vertical variations in measured and calculated parameters. The rock quality index and the two dimensionless ({pi}) indices developed by Kewen Yin of the University of Minnesota are used by Minntac Mine to design their blasts, but the drill monitor data from any given pattern is obviously not available for the design of that shot. Therefore, the blast results--which are difficult to quantify in a short time--must be back-analyzed for comparison with the drill monitor data to be useful for subsequent blast designs. {pi}{sub 1} indicates the performance of the drill, while {pi}{sub 2} is a measure of the rock resistance to drilling. As would be expected, since a drill tends to perform better in rock that offers little resistance, {pi}{sub 1} and {pi}{sub 2} are strongly inversely correlated; the relationship is a power function rather than simply linear. Low values of each Pi index tend to be quantized, indicating that these two parameters may be most useful above certain minimum magnitudes. (2) Work in Progress: Hibtac Mine--Statistical examination of a data set from Hibtac Mine (Table 1) shows that incorporating information on the size distribution of material feeding from the crusher to the autogenous mills improves the predictive capability of the model somewhat (43% vs. 44% correlation coefficient), but a more important component is production data from preceding days (26% vs. 44% correlation coefficient), determined using exponentially weighted moving average predictive variables. This lag effect likely reflects the long and varied residence times of the different size fragments in the grinding mills. The rock sizes are also correlated with the geologic

  9. Managing the high level waste nuclear regulatory commission licensing process

    International Nuclear Information System (INIS)

    Baskin, K.P.

    1992-01-01

    This paper reports that the process for obtaining Nuclear Regulatory Commission permits for the high level waste storage facility is basically the same process commercial nuclear power plants followed to obtain construction permits and operating licenses for their facilities. Therefore, the experience from licensing commercial reactors can be applied to the high level waste facility. Proper management of the licensing process will be the key to the successful project. The management of the licensing process was categorized into four areas as follows: responsibility, organization, communication and documentation. Drawing on experience from nuclear power plant licensing and basic management principles, the management requirement for successfully accomplishing the project goals are discussed

  10. Life Support Systems: Wastewater Processing and Water Management

    Data.gov (United States)

    National Aeronautics and Space Administration — Advanced Exploration Systems (AES) Life Support Systems project Wastewater Processing and Water Management task: Within an integrated life support system, water...

  11. Human resources management in a translation process

    OpenAIRE

    Rogelj, Jure

    2015-01-01

    The purpose of the web application development is the modernization of the current data acquisition and management model for new and existing translators in the company Iolar d.o.o. Previously data on translators who signed up to work in the company were entered multiple times as they were entered through several entry points. The acquired data were then manually entered into an MS Excel sheet and the Projetex program. We analyzed the current data acquisition and management model as well ...

  12. Human resources management in a translation process

    OpenAIRE

    Rogelj, Jure

    2014-01-01

    The purpose of the web application development is the modernization of the current data acquisition and management model for new and existing translators in the company Iolar d.o.o. Previously data on translators who signed up to work in the company were entered multiple times as they were entered through several entry points. The acquired data were then manually entered into an MS Excel sheet and the Projetex program. We analyzed the current data acquisition and management model as well ...

  13. Organizational structure features supporting knowledge management processes

    OpenAIRE

    Claver-Cortés, Enrique; Zaragoza Sáez, Patrocinio del Carmen; Pertusa-Ortega, Eva

    2007-01-01

    Purpose – The idea that knowledge management can be a potential source of competitive advantage has gained strength in the last few years. However, a number of business actions are needed to generate an appropriate environment and infrastructure for knowledge creation, transfer and application. Among these actions there stands out the design of an organizational structure, the link of which with knowledge management is the main concern here. More specifically, the present paper has as its aim...

  14. Towards an Evaluation Framework for Business Process Integration and Management

    NARCIS (Netherlands)

    Mutschler, B.B.; Reichert, M.U.; Bumiller, J.

    2005-01-01

    Process-awareness in enterprise computing is a must in order to adequately support business processes. Particularly the interoperability of the (process-oriented) business information systems and the management of a company’s process map are difficult to handle. Process-oriented approaches (like

  15. Application of Configurators in Networks

    DEFF Research Database (Denmark)

    Malis, Martin; Hvam, Lars

    2003-01-01

    Shorter lead-time, improved quality of product specifications and better communication with customers and suppliers are benefits derived from the application of configurators. Configurators are knowledge-based IT-systems that can be applied to deal with product knowledge and to support different...... processes in a company. Traditionally, configurators have been used as an internal tool. In this paper focus will be on the application of configurators in a network of companies, and a procedure for developing product configurators in a network of companies will be presented. The aim is to present...... a structured guideline, tools and methods on how to successfully develop configurators in a network perspective. Findings presented in this paper are supported by research in a case company. The results from the empirical work show a huge potential for the application of configurators in networks of companies....

  16. TWRS process engineering data management plan

    Energy Technology Data Exchange (ETDEWEB)

    Adams, M.R.

    1997-05-12

    The Tank Characterization Data Management (TCDM) system provides customers and users with data and information of known and acceptable quality when they are needed, in the form they are needed, and at a reasonable cost. The TCDM mission will be accomplished by the following: (1) maintaining and managing tank characterization data and information based on business needs and objectives including transfer of ownership to future contractors; (2) capturing data where it originates and entering it only once to control data consistency, electronic data and information management shall be emphasized to the extent practicable; (3) establishing data quality standards, and managing and certifying databases and data sources against these standards to maintain the proper level of data and information quality consistent with the importance of the data and information, data obtained at high cost with significant implications to decision making regarding tank safety and/or disposal will be maintained and managed at the highest necessary levels of quality; (4) establishing and enforcing data management standards for the Tank Characterization Database (TCD) and supporting data sources including providing mechanisms for discovering and correcting data errors before they propagate; (5) emphasizing electronic data sharing with all authorized users, customers, contractors, and stakeholders to the extent practicable; (6) safeguarding data and information from unauthorized alteration or destruction; (7) providing standards for electronic information deliverables to subcontractors and vendors to achieve uniformity in electronic data management; and (8) investing in new technology (hardware and/or software) as prudent and necessary to accomplish the mission in an efficient and effective manner.

  17. An Application of Business Process Management to Health Care Facilities.

    Science.gov (United States)

    Hassan, Mohsen M D

    The purpose of this article is to help health care facility managers and personnel identify significant elements of their facilities to address, and steps and actions to follow, when applying business process management to them. The ABPMP (Association of Business Process Management Professionals) life-cycle model of business process management is adopted, and steps from Lean, business process reengineering, and Six Sigma, and actions from operations management are presented to implement it. Managers of health care facilities can find in business process management a more comprehensive approach to improving their facilities than Lean, Six Sigma, business process reengineering, and ad hoc approaches that does not conflict with them because many of their elements can be included under its umbrella. Furthermore, the suggested application of business process management can guide and relieve them from selecting among these approaches, as well as provide them with specific steps and actions that they can follow. This article fills a gap in the literature by presenting a much needed comprehensive application of business process management to health care facilities that has specific steps and actions for implementation.

  18. Defining Incident Management Processes for CSIRTs: A Work in Progress

    National Research Council Canada - National Science Library

    Alberts, Chris; Dorofee, Audrey; Killcrece, Georgia; Ruefle, Robin; Zajicek, Mark

    2004-01-01

    .... Workflow diagrams and descriptions are provided for each of these processes. One advantage of the model is that it enables examination of incident management processes that cross organizational boundaries, both internally and externally...

  19. Service management process maps your route to service excellence

    CERN Document Server

    Associates, Computer

    2007-01-01

    ITIL® has become the de facto standard in Service Management best practice processes and the lens through which the value of IT services is viewed and measured. ITIL, with its emphasis on standardizing IT processes and building a common language, helps you better manage and optimize the cost and quality of IT services.As organizations look to implement quality Service Management processes, the same questions repeatedly arise: How do all these processes interface with each other? How do the processes work within a culture of change and evolution? How can we easily communicate

  20. ISO 9001 2000 : the quality management process

    CERN Document Server

    Tricker, Ray

    2006-01-01

    With the publication of ISO 9001:2000, there is now a single quality management ?requirements? standard that is applicable to all organisations, products and services. ISO 9001:2000 is the only standard that can be used for the certification of a QMS and its generic requirements can be used by any organisation.ISO 9001:2000 applies to all types or organisations. It is the quality standard which specifies the requirements of quality management systems for use where organisations need to demonstrate their capability to provide products and services which meet both customer needs and relevant reg