WorldWideScience

Sample records for compliance project selection

  1. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  2. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  3. Project Compliance with Enterprise Architecture

    NARCIS (Netherlands)

    Foorthuis, R.M.

    2012-01-01

    This research project set out to identify effective practices and models for working with projects that are required to comply with Enterprise Architecture (EA), and investigate the benefits and drawbacks brought about by compliance. Research methods used are canonical action research, a statistical

  4. Project W-211 initial tank retrieval systems year 2000 compliance assessment project plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-211. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  5. Environmental management compliance reengineering project, FY 1997 report

    International Nuclear Information System (INIS)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL''s environment, safety, and health requirements and milestone commitments. Compliance reengineer''s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL

  6. Environmental management compliance reengineering project, FY 1997 report

    Energy Technology Data Exchange (ETDEWEB)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  7. Project W-519 TWRS privatization phase 1 infrastructure year 2000 compliance assessment project plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-519. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  8. Project W-151 Tank 101-AZ Waste Retrieval System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-151. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  9. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  10. Canister storage building compliance assessment SNF project NRC equivalency criteria - HNF-SD-SNF-DB-003

    International Nuclear Information System (INIS)

    BLACK, D.M.

    1999-01-01

    This document presents the Project's position on compliance with the SNF Project NRC Equivalency Criteria - HNF-SD-SNF-DE-003, Spent Nuclear Fuel Project Path Forward Additional NRC Requirements. No non-compliances are shown. The compliance statements have been reviewed and approved by DOE. Open items are scheduled to be closed prior to project completion

  11. ELECTRONIC COMPLIANCE AND APPROVAL PROJECT (ECAP)

    Energy Technology Data Exchange (ETDEWEB)

    Hope Morgan; Richard A. Varela; Deborah LaHood; Susan Cisco; Mary Ann Benavides; Donna Burks

    2002-11-01

    The Texas Railroad Commission (RRC), working in partnership with the United States Department of Energy and the oil and gas industry it regulates, is implementing a strategy for improving efficiency in regulations and significantly reducing administrative operating costs through the Electronic Compliance and Approval Process (ECAP). The project will streamline regulatory compliance and reporting by providing the ability to electronically submit, process, and query oil and gas applications and reports through the Internet-based ECAP system. Implementation of an ECAP drilling permit pilot project began September 1999 after funding resources were secured--a $700,000 grant from the U.S. Department of Energy and an appropriation of $1.4 million from the Texas Legislature. The pilot project involves creating the ability to file, review, and approve a well's drilling permit application through a completely electronic process. The pilot project solution will ultimately provide the infrastructure, technology, and electronic modules to enable the filing of all compliance permits and performance reports through the internet from a desktop computer. The pilot project was conducted in three phases. The first phase, implemented May 2000, provided the infrastructure that allows the electronic filing and approval of simple drilling permit applications, associated fees, and attachments. The official ''roll-out'' of ECAP and the first electronically filed drilling permit application occurred on May 11, 2000 in Dallas in conjunction with an Internet Workshop sponsored by the Petroleum Technology Transfer Council. After the completion of Phase I, the ECAP team conducted an extensive review of progress to date and analyzed requirements and opportunities for future steps. The technical team identified core infrastructure modifications that would facilitate and better support future development and expansion of the ECAP system and work began on database structure

  12. Project in use compliance air pollution by cars: annual report 1994-1995

    NARCIS (Netherlands)

    Rijkeboer, R.C.; Binkhorst, R.P.; Zuidgeest, L.W.M.; Rozendal, W.G.J.

    1996-01-01

    This report describes the results of the 8th measuring year of the "in-use compliance project" carried out by TNO at the request of the Dutch Ministry of the Environment. Purpose and implementation of the project are in general terms that in connection with compliance with (international)

  13. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  14. Supporting domain experts to select and configure precise compliance rules

    NARCIS (Netherlands)

    Ramezani, E.; Fahland, D.; Aalst, van der W.M.P.; Lohmann, N.; Song, M.; Wohed, P.

    2014-01-01

    Compliance specifications concisely describe selected aspects of what a business operation should adhere to. To enable automated techniques for compliance checking, it is important that these requirements are specified correctly and precisely, describing exactly the behavior intended. Although there

  15. Design of compliant mechanisms with selective compliance

    International Nuclear Information System (INIS)

    Hasse, Alexander; Campanile, Lucio Flavio

    2009-01-01

    Conventional mechanisms provide a defined mobility, which expresses the number of degrees of freedom of the mechanism. This allows the system to be driven by a low number of control outputs. This property is virtually retained in the case of compliant mechanisms with lumped compliance, which are obtained by replacing the conventional hinges by solid-state ones. Compliant mechanisms with distributed compliance have, in general, an infinite number of degrees of freedom and therefore cannot guarantee defined kinematics. In this paper the concept of compliant mechanisms with selective compliance is introduced. This special class of compliant mechanisms combines the advantages of distributed compliance with the easy controllability of systems with defined kinematics. The task is accomplished by introducing a new design criterion based on a modal formulation. After this design criterion has been implemented in an optimization formulation for a formal optimization procedure, mechanisms are obtained in which a freely chosen deformation pattern is associated with a low deformation energy while other deformation patterns are considerably stiffer. Besides the description of the modal design criterion and the associated objective function, the sensitivity analysis of the objective function is presented and an application example is shown

  16. Environmental Assessment of Ground Water Compliance at the Gunnison, Colorado, UMTRA Project Site

    International Nuclear Information System (INIS)

    2002-01-01

    The U.S. Department of Energy (DOE) is in the process of selecting a ground water compliance strategy for the Gunnison, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This Environmental Assessment (EA) discusses two alternatives and the effects associated with each. The two alternatives are (1) natural flushing coupled with institutional controls and continued monitoring and (2) no action. The compliance strategy must meet U.S. Environmental Protection Agency (EPA) ground water standards defined in Title 40 ''Code of Federal Regulations'' Part 192, Subpart B, in areas where ground water beneath and around the site is contaminated as a result of past milling operations. It has been determined that contamination in the ground water at the Gunnison site consists of soluble residual radioactive material (RRM) as defined in the Uranium Mill Tailings Radiation Control Act (UMTRCA)

  17. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  18. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  19. Ecological Compliance Assessment Project: 1994 Summary report

    International Nuclear Information System (INIS)

    Brandt, C.A.

    1994-11-01

    The Ecological Compliance Assessment Project (ECAP) began full operation on March 1, 1994. The project is designed around a baseline environmental data concept that includes intensive biological field surveys of key areas of the Hanford Site where the majority of Site activities occur. These surveys are conducted at biologically appropriate times of year to ensure that the data gathered are current and accurate. The data are entered into the ECAP database, which serves as a reference for the evaluation of review requests coming in to the project. This methodology provided the basis for over 90 percent of the review requests received. Field surveys conducted under ECAP are performed to document occurrence information for species of concern and to obtain habitat descriptions. There are over 200 species of concern on the Hanford Site, including plants, birds, mammals, reptiles, amphibians, fish, and invertebrates. In addition, Washington State has designated mature sagebrush-steppe habitat as a Priority Habitat meriting special protective measures. Of the projects reviewed, 17 resulted or will result in impacts to species or habitats of concern on the Hanford Site. The greatest impact has been on big sagebrush habitat. Most of the impact has been or will be within the 600 Area of the Site

  20. Compliance status summaries for federal and state statutory directives that apply to the Salt Repository Project at the Deaf Smith County Site, Texas

    International Nuclear Information System (INIS)

    1986-07-01

    This document contains statutory summaries, checklists of compliance requirements, status summaries, and lists of information needs for the environmental and health and safety statutory directives at Federal and State levels that apply to the Salt Repository Project at the Deaf Smith County Site, Texas. Statutes that apply in general to any repository project but not specifically to the Deaf Smith are not included. The information herein supplements the Salt Repository Project Statutory Compliance Plan and the Salt Repository Project Permitting Management Plan by providing lengthy details on statutory directives, compliance requirements, information needs, and the overall status of the environmental and health and safety compliance program for the Salt Repository Project at the Deaf Smith County Site, Texas

  1. CROSS-COMPLIANCE Facilitating the CAP reform: Compliance and competitiveness of European agriculture : Specific Targeted Research or Innovation Project (STREP) Integrating and Strengthening the European Research Area

    NARCIS (Netherlands)

    Jongeneel, R.A.; Bezlepkina, I.; Winsten, J.; Fox, G.

    2008-01-01

    The prime aim or the project was on assessing the impacts of compliance with standards, more specifically those part of cross-compliance, on EU’s external competitiveness. This is why in several deliverables and also in the main text of this Deliverable 13 a lot of attention is given to the EU and

  2. R and D programmes in Germany. Selection and evaluation of projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Germany, budgets for research and development rest on three pillars, which are the federal government, the 16 states, and the civil sector. The total expenditure for 1997 amounted to 83.7 times 1 billion Deutsche marks, and this occupied 2.3 of Germany's GNP (gross national product). National research projects constitute the main stream even today. As for federal government-financed projects, they are managed mainly by BMBF (Federal Ministry of Education, Science, Research, and Technology). There are project carriers as the managerial organizations. Requests for proposals for research and development projects are published in official gazettes and technical journals. Such a project has to contain detailed descriptions regarding the setting of targets, levels of technology, cost accounting, development schedule, history of discovery and development involved, etc. Analyses are conducted into technology, economic risk, market, and environmental impact. Support by the German government for government-related projects is given in compliance with predetermined guidelines. The evaluation and selection of submitted proposals are performed by professionals of the project carrier level. In this paper, explanations are also given about contracts, management of progress, and evaluation. (NEDO)

  3. Evaluation of the WIPP Project`s compliance with the EPA radiation protection standards for disposal of transuranic waste

    Energy Technology Data Exchange (ETDEWEB)

    Neill, R.H.; Chaturvedi, L.; Rucker, D.F.; Silva, M.K.; Walker, B.A.; Channell, J.K.; Clemo, T.M. [Environmental Evaluation Group, Albuquerque, NM (United States)]|[Environmental Evaluation Group, Carlsbad, NM (United States)

    1998-03-01

    The US Environmental Protection Agency`s (EPA) proposed rule to certify that the Waste Isolation Pilot Plant (WIPP) meets compliance with the long-term radiation protection standards for geologic repositories (40CFR191 Subparts B and C), is one of the most significant milestones to date for the WIPP project in particular, and for the nuclear waste issue in general. The Environmental Evaluation Group (EEG) has provided an independent technical oversight for the WIPP project since 1978, and is responsible for many improvements in the location, design, and testing of various aspects of the project, including participation in the development of the EPA standards since the early 1980s. The EEG reviewed the development of documentation for assessing the WIPP`s compliance by the Sandia National Laboratories following the 1985 promulgation by EPA, and provided many written and verbal comments on various aspects of this effort, culminating in the overall review of the 1992 performance assessment. For the US Department of Energy`s (DOE) compliance certification application (CCA), the EEG provided detailed comments on the draft CCA in March, 1996, and additional comments through unpublished letters in 1997 (included as Appendices 8.1 and 8.2 in this report). Since the October 30, 1997, publication of the EPA`s proposed rule to certify WIPP, the EEG gave presentations on important issues to the EPA on December 10, 1997, and sent a December 31, 1997 letter with attachments to clarify those issues (Appendix 8.3). The EEG has raised a number of questions that may have an impact on compliance. In spite of the best efforts by the EEG, the EPA reaction to reviews and suggestions has been slow and apparently driven by legal considerations. This report discusses in detail the questions that have been raised about containment requirements. Also discussed are assurance requirements, groundwater protection, individual protection, and an evaluation of EPA`s responses to EEG`s comments.

  4. Utilizing Forced Vital Capacity to Predict Low Lung Compliance and Select Intraoperative Tidal Volume During Thoracic Surgery.

    Science.gov (United States)

    Hoftman, Nir; Eikermann, Eric; Shin, John; Buckley, Jack; Navab, Kaveh; Abtin, Fereidoun; Grogan, Tristan; Cannesson, Maxime; Mahajan, Aman

    2017-12-01

    Tidal volume selection during mechanical ventilation utilizes dogmatic formulas that only consider a patient's predicted body weight (PBW). In this study, we investigate whether forced vital capacity (FVC) (1) correlates better to total lung capacity (TLC) than PBW, (2) predicts low pulmonary compliance, and (3) provides an alternative method for tidal volume selection. One hundred thirty thoracic surgery patients had their preoperative TLC calculated via 2 methods: (1) pulmonary function test (PFT; TLCPFT) and (2) computed tomography 3D reconstruction (TLCCT). We compared the correlation between TLC and PBW with the correlation between TLC and FVC to determine which was stronger. Dynamic pulmonary compliance was then calculated from intraoperative ventilator data and logistic regression models constructed to determine which clinical measure best predicted low compliance. Ratios of tidal volume/FVC plotted against peak inspiratory pressure were utilized to construct a new model for tidal volume selection. Calculated tidal volumes generated by this model were then compared with those generated by the standard lung-protective formula Vt = 7 cc/kg. The correlation between FVC and TLC (0.82 for TLCPFT and 0.76 for TLCCT) was stronger than the correlation between PBW and TLC (0.65 for TLCPFT and 0.58 for TLCCT). Patients with very low compliance had significantly smaller lung volumes (forced expiratory volume at 1 second, FVC, TLC) and lower diffusion capacity of the lungs for carbon monoxide when compared with patients with normal compliance. An FVC cutoff of 3470 cc was 100% sensitive and 51% specific for predicting low compliance. The proposed equation Vt = FVC/8 significantly reduced calculated tidal volume by a mean of 22.5% in patients with low pulmonary compliance without affecting the mean tidal volume in patients with normal compliance (mean difference 0.9%). FVC is more strongly correlated to TLC than PBW and a cutoff of about 3.5 L can be utilized to predict

  5. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    Science.gov (United States)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  6. Environmental Compliance Guide

    International Nuclear Information System (INIS)

    1981-02-01

    The Guide is intended to assist Department of Energy personnel by providing information on the NEPA process, the processes of other environmental statutes that bear on the NEPA process, the timing relationships between the NEPA process and these other processes, as well as timing relationships between the NEPA process and the development process for policies, programs, and projects. This information should be helpful not only in formulating environmental compliance plans but also in achieving compliance with NEPA and various other environmental statutes. The Guide is divided into three parts with related appendices: Part I provides guidance for developing environmental compliance plans for DOE actions; Part II is devoted to NEPA with detailed flowcharts depicting the compliance procedures required by CEQ regulations and Department of Energy NEPA Guidelines; and Part III contains a series of flowcharts for other Federal environmental requirements that may apply to DOE projects

  7. Environmental Compliance Guide

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-01

    The Guide is intended to assist Department of Energy personnel by providing information on the NEPA process, the processes of other environmental statutes that bear on the NEPA process, the timing relationships between the NEPA process and these other processes, as well as timing relationships between the NEPA process and the development process for policies, programs, and projects. This information should be helpful not only in formulating environmental compliance plans but also in achieving compliance with NEPA and various other environmental statutes. The Guide is divided into three parts with related appendices: Part I provides guidance for developing environmental compliance plans for DOE actions; Part II is devoted to NEPA with detailed flowcharts depicting the compliance procedures required by CEQ regulations and Department of Energy NEPA Guidelines; and Part III contains a series of flowcharts for other Federal environmental requirements that may apply to DOE projects.

  8. IDENTIFICATION AND SELECTION OF SIX SIGMA PROJECTS

    Directory of Open Access Journals (Sweden)

    Abdalhkeim FA. Flifel

    2017-04-01

    Full Text Available Six Sigma is a well-structured and proven methodology for improving organizational performance. It helps achieving the goals of the organization through the use of project-driven approach. The implementation of Six sigma approach depends on proper identification and selection of projects, moreover, the selection of right Six sigma projects is one of the critical success factors of six sigma efforts. The paper provides the sources for the identification of potential projects, top down and bottom up approaches, the process of selection of projects, guidelines that assist the selection of appropriate projects, selection criteria which must be precisely chosen in accordance with the objectives, needs and capabilities of the organization as well as sophisticated techniques and tools recommended in the literature for the selection of projects.

  9. DOE`s approach to groundwater compliance on the UMTRA project

    Energy Technology Data Exchange (ETDEWEB)

    Metzler, D. [Dept. of Energy, Washington, DC (United States); Gibb, J.P. [Geraghty and Miller, Inc. (United States); Glover, W.A. [Roy F. Weston, Inc. (United States)

    1993-03-01

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists, a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.

  10. Adolescents' Compliance-Resistance: Effects of Parents' Compliance Strategy and Gender.

    Science.gov (United States)

    White, Kim D.; And Others

    1989-01-01

    Examined choice of compliance-resisting behaviors among adolescents. Findings from 118 high school students revealed significant differences in resistance strategy the adolescent selected on basis of parent gender, adolescent gender, and compliance-gaining strategy (manipulation, nonnegotiation, emotional appeal, personal rejection, empathic…

  11. Educational Intervention Improves Compliance With AAN Guidelines for Return Epilepsy Visits: A Quality Improvement Project.

    Science.gov (United States)

    Nelson, Gary R; Filloux, Francis M; Kerr, Lynne M

    2016-10-01

    In 2011, the American Academy of Neurology (AAN) released guidelines for return seizure visits detailing 8 points that should be addressed during such visits. These guidelines are designed to improve routine follow-up care for epilepsy patients. The authors performed a quality improvement project aimed at increasing compliance with these guidelines after educating providers about them. The authors performed a chart review before and after an intervention which included: education regarding the guidelines, providing materials to remind providers of the guidelines, and templates to facilitate compliance. The authors reviewed charts at 2 and 6 months after the intervention. Significant improvement in documentation of 4 of the 8 measures was observed after this educational intervention. This suggests that simple educational interventions may help providers change practice and can improve compliance with new guidelines while requiring minimal time and resources to implement. © The Author(s) 2016.

  12. Compliance pluralisme and processes : Understanding compliance behavior in restaurants in China

    NARCIS (Netherlands)

    Wu, Y.

    2017-01-01

    This research aimed to offer a case study of dynamic compliance processes in selected Chinese restaurants with the main methods of participant observation and in-depth interviews. It applied an integrated and dynamic research approach, called descriptive analysis of compliance behavior, which

  13. A proposal to prove compliance of ESD with EU-guidelines

    International Nuclear Information System (INIS)

    Tschurlovits, M.

    2001-01-01

    The question of compliance with the diagnostic reference levels issued as European Guidelines is discussed based upon measurements of entrance surface dose in four selected projections. The projections were chosen either for the higher dose associated with the investigation or the high frequency of the investigation. The results for the high dose projections lumbar spine and iv pyelography were found to be well below the guidelines. The results for the low dose projections chest pa and chest lat show a mean at about the guidance level. The parameters of the measurements are shown and possible reasons for the scattering of data are discussed. The parameters of the measurements are compared with the proposal of the EU. The main conclusion was a) that even when not all parameters are consistent with EU-guides, the dose is frequently much lower than required. In addition, the ranking in ESD was different for different techniques and different radiologists. Because an approved method to indicate compliance is not yet available, a proposal is given in order to make the guidelines executable. (author)

  14. Corruption and compliance: preventive legislations and policies in international business projects

    Directory of Open Access Journals (Sweden)

    Harsh PATHAK

    2013-12-01

    Full Text Available This article seeks to provide an insight on the international phenomenon of corruption, dealing with its existence, and whether compliance is higher with Anti-Corruption laws or with corruption itself, resulting in anti-corruption laws being much less effective than the legislators intended it to be and the reasons for increasing demand worldwide for new governance standards and higher compliance controls and other effective anti-corruption laws and policies in light of rapid increase in corruption every year. This article further deals with the diagnosis and measures to deal with the cause of corruption – the short-comings in anti-corruption law – the reasons why corporations are willing to face continuing legal risks and adverse publicity but still indulge in corrupt practices and the extent of negative impact the prevailing levels of corruption ultimately have on international business and trade. Strict compliance controls are being introduced with increasing enforcement of anti-corruption laws internationally and nations have also started to focus on individual and corporate liability in cases of violation of anti-corruption laws, for both government and private organisations. In this context of far-reaching developments, whether European and South-east Asian Countries like India and International Business Organisations can act in ignorance or buck up and accept this trend, slowly and steadily moving towards a less corrupt nation and International business projects – if not towards a totally corruption free one, keeping in mind the growth of international trade and Commerce and its sustainability.

  15. Environmental compliance assessment findings for Weldon Spring Site Remedial Action Program

    International Nuclear Information System (INIS)

    Sigmon, C.F.; Levine, M.B.

    1990-01-01

    This report presents the results of an environmental assessment conducted at Weldon Spring Site Remedial Action Project (WSSRAP) in St. Charles County, Missouri, in accordance with the Formerly Utilized Sites Remedial Action Program (FUSRAP) Environmental Compliance Assessment Checklists. The purpose of this assessment was to evaluate the compliance of the site with applicable federal and Missouri environment regulations. Assessments activities included the following: review of site records, reports ,and files; inspection of the WSSRAP storage building, other selected buildings, and the adjacent grounds; and interviews with project personnel. This assessment was conducted on August 28-30, 1989. The assessment covered five management areas as set forth in the Checklist: Hazardous Waste Management, Polychlorinated Biphenyls (PCBs) Management; Air Emissions; Wastewater Discharges and Petroleum Management. No samples were collected. 1 ref., 2 figs., 1 tab

  16. Compliance with Private Food Safety Standards among ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... and the livelihood impact of compliance. In addition, the project aims to build the capacity of farmers and other locally based actors to enhance compliance and thereby contribute to increased welfare in the project area. Expected outputs include one PhD thesis, five master's theses, and various journal publications and ...

  17. Evaluating impacts of Clean Air Act compliance strategies

    International Nuclear Information System (INIS)

    Shirer, D.A.; Evans, R.J.; Harrison, C.D.; Kehoe, D.B.

    1993-01-01

    The Clean Air Act Amendments of 1990 requires that by the year 2000, US SO 2 emissions must be reduced by 10 million tons. This requirement will have significant impact on coal-fired electric utilities. As a result, most utilities are currently evaluating numerous compliance options, including buying allowances, coal cleaning/blending/switching, and flue gas scrubbing. Moreover, each utility must address its own unique circumstances with regard to competition, efficiency, capital expenditures, reliability, etc. and many utilities may choose a combination of compliance options to simultaneously satisfy their environmental, performance, and financial objectives. The Coal Quality Expert, which is being developed under a clean coal technology project funded by US DOE and EPRI, will predict the economic, operational, and environmental benefits of using higher-quality coals and provides an assessment of the merits of various post-combustion control technologies for specific utility applications. This paper presents background on how utilities evaluate their compliance options, and it describes how the Coal Quality Expert could be used for such evaluations in the future to assure that each utility can select the best combination of coal specifications and emission control technologies to meet its compliance objectives

  18. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  19. Evaluation of the WIPP Project's compliance with the EPA radiation protection standards for disposal of transuranic waste

    International Nuclear Information System (INIS)

    Neill, R.H.; Chaturvedi, L.; Rucker, D.F.; Silva, M.K.; Walker, B.A.; Channell, J.K.; Clemo, T.M.

    1998-03-01

    The US Environmental Protection Agency's (EPA) proposed rule to certify that the Waste Isolation Pilot Plant (WIPP) meets compliance with the long-term radiation protection standards for geologic repositories (40CFR191 Subparts B and C), is one of the most significant milestones to date for the WIPP project in particular, and for the nuclear waste issue in general. The Environmental Evaluation Group (EEG) has provided an independent technical oversight for the WIPP project since 1978, and is responsible for many improvements in the location, design, and testing of various aspects of the project, including participation in the development of the EPA standards since the early 1980s. The EEG reviewed the development of documentation for assessing the WIPP's compliance by the Sandia National Laboratories following the 1985 promulgation by EPA, and provided many written and verbal comments on various aspects of this effort, culminating in the overall review of the 1992 performance assessment. For the US Department of Energy's (DOE) compliance certification application (CCA), the EEG provided detailed comments on the draft CCA in March, 1996, and additional comments through unpublished letters in 1997 (included as Appendices 8.1 and 8.2 in this report). Since the October 30, 1997, publication of the EPA's proposed rule to certify WIPP, the EEG gave presentations on important issues to the EPA on December 10, 1997, and sent a December 31, 1997 letter with attachments to clarify those issues (Appendix 8.3). The EEG has raised a number of questions that may have an impact on compliance. In spite of the best efforts by the EEG, the EPA reaction to reviews and suggestions has been slow and apparently driven by legal considerations. This report discusses in detail the questions that have been raised about containment requirements. Also discussed are assurance requirements, groundwater protection, individual protection, and an evaluation of EPA's responses to EEG's comments

  20. 49 CFR 268.17 - Project selection criteria.

    Science.gov (United States)

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  1. Ascorbic acid selectively improves large elastic artery compliance in postmenopausal women.

    Science.gov (United States)

    Moreau, Kerrie L; Gavin, Kathleen M; Plum, Angela E; Seals, Douglas R

    2005-06-01

    The compliance of large elastic arteries in the cardiothoracic region decreases with advancing age/menopause and plays an important role in the increased prevalence of cardiovascular diseases in postmenopausal women. We determined whether oxidative stress contributes to the reduced large elastic artery compliance of postmenopausal women. Carotid artery compliance was measured during acute intravenous infusions of saline (baseline control) and supraphysiological doses of the potent antioxidant ascorbic acid in premenopausal (n=10; 23+/-1; mean+/-SE) and estrogen-deficient postmenopausal (n=21; 55+/-1 years) healthy sedentary women. Carotid artery compliance was 56% lower in postmenopausal compared with premenopausal women during baseline control (PAscorbic acid infusion increased carotid artery compliance by 26% in postmenopausal women (1.11+/-0.07 to 1.38+/-0.08 mm2/mm Hgx10(-1); Pascorbic acid. In the pooled population, the change in arterial compliance with ascorbic acid correlated with baseline waist-to-hip ratio (r=0.56; P=0.001), plasma norepinephrine (r=0.58; P=0.001), and LDL cholesterol (r=0.54; P=0.001). These results suggest that oxidative stress may be an important mechanism contributing to the reduced large elastic artery compliance of sedentary, estrogen-deficient postmenopausal women. Increased abdominal fat storage, sympathetic nervous system activity, and LDL cholesterol may be mechanistically involved in oxidative stress-associated suppression of arterial compliance in postmenopausal women.

  2. Environmental Assessment of Ground Water Compliance at the Naturita, Colorado, UMTRA Project Site

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-04-23

    This Environmental Assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Naturita, Colorado, Uranium Mill Tailings Remedial Action Project site. In 1998, the U.S. Department of Energy (DOE) completed surface cleanup at the site and encapsulated the tailings in a disposal cell 15 miles northwest near the former town of Uravan, Colorado. Ground water contaminants of potential concern at the Naturita site are uranium and vanadium. Uranium concentrations exceed the maximum concentration limit (MCL) of 0.044 milligram per liter (mg/L). Vanadium has no MCL; however, vanadium concentrations exceed the EPA Region III residential risk-based concentration of 0.33 mg/L (EPA 2002). The proposed compliance strategy for uranium and vanadium at the Naturita site is no further remediation in conjunction with the application of alternate concentration limits. Institutional controls with ground water and surface water monitoring will be implemented for these constituents as part of the compliance strategy. This compliance strategy will be protective of human health and the environment. The proposed monitoring program will begin upon regulatory concurrence with the Ground Water Compliance Action Plan (DOE 2002a). Monitoring will consist of verifying that institutional controls remain in place, collecting ground water samples to verify that concentrations of uranium and vanadium are decreasing, and collecting surface water samples to verify that contaminant concentrations do not exceed a regulatory limit or risk-based concentration. If these criteria are not met, DOE would reevaluate the proposed action and determine the need for further National Environmental Policy Act documentation. No comments were received from the public during the public comment period. Two public meetings were held during this period. Minutes of these meetings are included as

  3. Environmental Assessment of Ground Water Compliance at the Naturita, Colorado, UMTRA Project Site

    International Nuclear Information System (INIS)

    2003-01-01

    This Environmental Assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Naturita, Colorado, Uranium Mill Tailings Remedial Action Project site. In 1998, the U.S. Department of Energy (DOE) completed surface cleanup at the site and encapsulated the tailings in a disposal cell 15 miles northwest near the former town of Uravan, Colorado. Ground water contaminants of potential concern at the Naturita site are uranium and vanadium. Uranium concentrations exceed the maximum concentration limit (MCL) of 0.044 milligram per liter (mg/L). Vanadium has no MCL; however, vanadium concentrations exceed the EPA Region III residential risk-based concentration of 0.33 mg/L (EPA 2002). The proposed compliance strategy for uranium and vanadium at the Naturita site is no further remediation in conjunction with the application of alternate concentration limits. Institutional controls with ground water and surface water monitoring will be implemented for these constituents as part of the compliance strategy. This compliance strategy will be protective of human health and the environment. The proposed monitoring program will begin upon regulatory concurrence with the Ground Water Compliance Action Plan (DOE 2002a). Monitoring will consist of verifying that institutional controls remain in place, collecting ground water samples to verify that concentrations of uranium and vanadium are decreasing, and collecting surface water samples to verify that contaminant concentrations do not exceed a regulatory limit or risk-based concentration. If these criteria are not met, DOE would reevaluate the proposed action and determine the need for further National Environmental Policy Act documentation. No comments were received from the public during the public comment period. Two public meetings were held during this period. Minutes of these meetings are included as

  4. A fuzzy hybrid approach for project manager selection

    Directory of Open Access Journals (Sweden)

    Ahmad Jafarnejad Chaghooshi

    2016-09-01

    Full Text Available Suitable project manager has a significant impact on successful accomplishment of the project. Managers should possess such skills in order to effectively cope with the competition. In this respect, selecting managers based on their skills can lead to a competitive advantage towards the achievement of organizational goals. selection of the suitable project manager can be viewed as a multi-criteria decision making (MCDM problem and an extensive evaluation of criteria, such as Technical skills, experience skills, Personal qualities and the related criteria must be considered in the selection process of project manager. The fuzzy set theory and MCDM methods appears as an essential tools to provide a decision framework that incorporates imprecise judgments and multi criteria nature of project manager selection process inherent in this process. This paper proposes the joint use of the Fuzzy DEMATEL (FDEMATEL and Fuzzy VIKOR methods for the decision-making process of selecting the most suitable managers for projects. First, with the opinions of the senior managers based on project management competency model (ICB-IPMA, all the criteria required for the selection are gathered. Then the FDEMATEL method is used to prioritize the importance of various criteria and FVIKOR used to rank the alternatives in a preferred order to select the best project managers from a number of alternatives. Next, a real case study used to illustrate the process of the proposed method. Finally, some conclusions are discussed at the end of this study.

  5. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Down-selection of one or more Maglev projects for... Procedures For Financial Assistance § 268.21 Down-selection of one or more Maglev projects for further study... completion of Phase III of the Maglev Deployment Program, FRA will down-select one or more projects to...

  6. Environmental studies and clearance compliance of Kudankulam Atomic Power Project

    International Nuclear Information System (INIS)

    Agarwal, S.K.; Singh, Jitendra

    2002-01-01

    Full text: Nuclear industry has played a leading role in evolving proper and effective environmental management impact from development practices right form inception thus minimizing the environmental impact from developmental activities of man. In the engineering design of nuclear power plant, safety is further enhanced considerably by providing double back-upped engineered safety systems. Besides the engineered safety, the other factors considered for ensuring environmental impact minimization are siting criteria, conservative rad-waste management, effluent treatment, application of stringent environmental protection standards for limiting waste discharges, an elaborate environmental surveillance program and an on site and off site emergency preparedness plan. Recently, nuclear power industry has taken a drive to develop and implement Environmental Management System (EMS) to all its operating stations in line with ISO-14001 standards. For Kudankulam atomic power project, a number of studies specifically for environmental protection are carried out to meet the requirements of Russian Federation, new guidelines of Ministry of environment and Forests (MOEF) and Atomic Energy Regulatory Board (AERB). In the present paper an attempt has been made to present the environmental management plan and clearance compliance status of the project

  7. The Added Value of the Project Selection Process

    Directory of Open Access Journals (Sweden)

    Adel Oueslati

    2016-06-01

    Full Text Available The project selection process comes in the first stage of the overall project management life cycle. It does have a very important impact on organization success. The present paper provides defi nitions of the basic concepts and tools related to the project selection process. It aims to stress the added value of this process for the entire organization success. The mastery of the project selection process is the right way for any organization to ensure that it will do the right project with the right resources at the right time and within the right priorities

  8. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  9. Combinatorial Optimization in Project Selection Using Genetic Algorithm

    Science.gov (United States)

    Dewi, Sari; Sawaluddin

    2018-01-01

    This paper discusses the problem of project selection in the presence of two objective functions that maximize profit and minimize cost and the existence of some limitations is limited resources availability and time available so that there is need allocation of resources in each project. These resources are human resources, machine resources, raw material resources. This is treated as a consideration to not exceed the budget that has been determined. So that can be formulated mathematics for objective function (multi-objective) with boundaries that fulfilled. To assist the project selection process, a multi-objective combinatorial optimization approach is used to obtain an optimal solution for the selection of the right project. It then described a multi-objective method of genetic algorithm as one method of multi-objective combinatorial optimization approach to simplify the project selection process in a large scope.

  10. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  11. Project Selection for NASA's R&D Programs

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

  12. Canister storage building compliance assessment DOE Order 6430.1A, General Design Criteria

    International Nuclear Information System (INIS)

    BLACK, D.M.

    1999-01-01

    This document presents the Project's position on compliance with DOE Order 6430.1A ''General Design Criteria.'' No non-compliances are shown. The compliance statements have been reviewed and approved by DOE. Open items are scheduled to be closed prior to project completion

  13. PROJECT PORTFOLIO SELECTION COMPETENCES RESEARCH INUNIVERSITIES OF LITHUANIA

    OpenAIRE

    R #363;ta #268;iutien #279;; Evelina Meilien #279;; Bronius Neverauskas

    2011-01-01

    As a result of the theoretical findings, the paperdemonstrates that projectportfolio selection is crucial project management problem. Successful ProjectPortfolio management requires specific competences.Every project of projectportfolio must be evaluated according to the basedcriteria and parameters.Empirical study was based on framework matrix withfour parameters of projectportfolio selection and only two phases of projectportfolio formation. The r...

  14. New Evaluation of the Electronically Activated Recorder (EAR: Obtrusiveness, Compliance, and Participant Self-selection Effects

    Directory of Open Access Journals (Sweden)

    Joseph H. Manson

    2017-04-01

    Full Text Available The Electronically Activated Recorder (EAR is a method for collecting periodic brief audio snippets of participants’ daily lives using a portable recording device. The EAR can potentially intrude into people’s privacy, alter their natural behavior, and introduce self-selection biases greater than in other types of social science methods. Previous research (Mehl and Holleran, 2007, hereafter M&H has shown that participant non-compliance with, and perceived obtrusiveness of, an EAR protocol are both low. However, these questions have not been addressed in jurisdictions that require the consent of all parties to recording conversations. This EAR study required participants to wear a button bearing a microphone icon and the words “This conversation may be recorded” to comply with California’s all-party consent law. Results revealed self-reported obtrusiveness and non-compliance were actually lower in the present study than in the M&H study. Behaviorally assessed non-compliance did not differ between the two studies. Participants in the present study talked more about being in the study than participants in the M&H study, but such talk still comprised <2% of sampled conversations. Another potential problem with the EAR, participant self-selection bias, was addressed by comparing the EAR volunteers’ HEXACO personality dimensions to a non-volunteer sample drawn from the same student population. EAR volunteers were significantly and moderately higher in Conscientiousness, and lower in Emotionality, than non-volunteers. In conclusion, the EAR method can be successfully implemented in at least one all-party consent state (California. Interested researchers are encouraged to review this procedure with their own legal counsel.

  15. Discriminative Projection Selection Based Face Image Hashing

    Science.gov (United States)

    Karabat, Cagatay; Erdogan, Hakan

    Face image hashing is an emerging method used in biometric verification systems. In this paper, we propose a novel face image hashing method based on a new technique called discriminative projection selection. We apply the Fisher criterion for selecting the rows of a random projection matrix in a user-dependent fashion. Moreover, another contribution of this paper is to employ a bimodal Gaussian mixture model at the quantization step. Our simulation results on three different databases demonstrate that the proposed method has superior performance in comparison to previously proposed random projection based methods.

  16. A quality project to improve compliance with AAP guidelines for inpatient management of neonatal hyperbilirubinemia.

    Science.gov (United States)

    Tartaglia, Kimberly M; Campbell, Jessica; Shaniuk, Paul; McClead, Richard E

    2013-07-01

    The goal of this study was to improve compliance with published guidelines regarding management of neonatal hyperbilirubinemia in infants admitted to a general pediatric hospital ward and to improve support for their breastfeeding mothers. This quality improvement project was conducted by using Plan-Do-Study-Act cycles and statistical process control methods. Study subjects were infants > 35 weeks' gestation admitted for hyperbilirubinemia to the general inpatient ward of a large, freestanding pediatric hospital. We developed and implemented a guideline for the inpatient management of jaundiced neonates, with ongoing feedback given to the faculty on group performance. Outcome measures included monthly compliance scores based on American Academy of Pediatrics (AAP) guidelines for management of neonates > 35 weeks' gestation and the percentage of admitted jaundiced, breastfeeding infants whose mothers received lactation consultation during hospitalization. To determine the AAP compliance score, we reviewed and assigned points to each patient admission for completion of a standard evaluation, avoidance of unnecessary intravenous (IV) fluids and peripheral IV line placement, avoidance of rebound bilirubin checks while in the hospital, and the bilirubin level at discharge. Mean monthly AAP compliance scores increased from 60.5% of total possible points during the baseline period (January 2010-December 2010) to 90.4% during the intervention period (January 2011-December 2011). Lactation consultations increased from 48% during our baseline period to 63% during our early intervention period and to 90% during the last 5 months of our intervention. Length of stay was unchanged during the baseline and intervention periods. Interprofessional collaboration between nurses and physicians combined with a thoughtful campaign to increase awareness of published guidelines were successful in improving the care of infants admitted with unconjugated hyperbilirubinemia.

  17. Selection of a portfolio of R & D projects

    NARCIS (Netherlands)

    Casault, Sébastien; Groen, Arend J.; Linton, J.D.; Linton, Jonathan; Link, A.N.; Vonortas, N.S.

    2013-01-01

    While portfolios of research are increasingly discussed, a portfolio perspective is infrequently taken when selecting two or more projects. Consequently, this chapter considers the current state of knowledge in project and portfolio selection, identifies why we can and cannot apply knowledge from

  18. Compliance Performance: Effects of a Provider Incentive Program and Coding Compliance Plan

    National Research Council Canada - National Science Library

    Tudela, Joseph A

    2004-01-01

    The purpose of this project is to study provider and coder related performance, i.e., provider compliance rate and coder productivity/accuracy rates and average dollar difference between coder and auditor, at Brooke Army Medical Center...

  19. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River

  20. Site observational work plan for the UMTRA Project site at Spook, Wyoming

    International Nuclear Information System (INIS)

    1995-05-01

    The Spook, Wyoming, site observational work plan proposes site-specific activities to achieve compliance with Subpart B of 40 CFR Part 192 (1994) of the final US Environmental Protection Agency (EPA) ground water protection standards 60 FR 2854 (1995) at this Uranium Mill Tailing Remedial Action (UMTRA) Project site. This draft SOWP presents a comprehensive summary of existing site characterization data, a conceptual site model of the nature and extent of ground water contamination, exposure pathways, and potential impact to human health and the environment. Section 2.0 describes the requirements for meeting ground water standards at UMTRA Project sites. Section 3.0 defines past and current conditions, describes potential environmental and human health risks, and provides site-specific data that supports the selection of a proposed ground water compliance strategy. Section 4.0 provides the justification for selecting the proposed ground water compliance strategy based on the framework defined in the ground water programmatic environmental impact statement (PEIS)

  1. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  2. ANP applied to electronics engineering project selection

    International Nuclear Information System (INIS)

    Habib, M.

    2010-01-01

    Project selection in Electronics engineering is a complex decision-making process. This research paper illustrates an application of ANP/AHP process. The AHP (Analytic Hierarchy Process) is employed to break down large unstructured decision problems into manageable and measureable components. The ANP, as the general form of AHP, is powerful to deal with complex decisions where interdependence exists in a decision model. The research paper discusses the use of the ANP, a general form of Saaty's analytic Network process, as a model to evaluate the value of competing Electronics projects. The research paper concludes with a case study describing the implementation of this model at an engineering college, including data based on the actual use of the decision making model. The case study helps to verify that AHP is an effective and efficient decision-making tool. A major contribution of this work is to provide a methodology for assessing the best project. Despite a number of publications applying AHP in project selection, this is probably the first time that an attempt has been made to apply AHP in an electronics project selection in an engineering university environment. (author)

  3. Architecture-based regulatory compliance argumentation

    DEFF Research Database (Denmark)

    Mihaylov, Boyan; Onea, Lucian; Hansen, Klaus Marius

    2016-01-01

    Standards and regulations are difficult to understand and map to software, which makes compliance with them challenging to argue for software products and development process. This is problematic since lack of compliance may lead to issues with security, safety, and even to economic sanctions....... An increasing number of applications (for example in healthcare) are expected to have to live up to regulatory requirements in the future, which will lead to more software development projects having to deal with such requirements. We present an approach that models regulations such that compliance arguments...... the approach on the migration of the telemedicine platform Net4Care to the cloud, where certain regulations (for example privacy) should be concerned. The approach has the potential to support simpler compliance argumentation with the eventual promise of safer and more secure applications....

  4. Using automated environmental management information systems to enable compliance: Ten questions to answer before selecting a software system

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, J.B.

    1999-07-01

    As technology invades the arena of environmental information management, hundreds of software packages have become available in the marketplace. How does the already overwhelmed environmental manager or IT professional decide what's right for the organization? Is there a software package that meets the needs of the organization, and is there a successful way to implement the system? Does this require abandoning existing systems with which users are comfortable? Can the system really save time and/or money? This paper discusses three topics: What drives the need for a system; Ten questions to aid in selecting a system that is right for your organization; and enabling technology and software systems available today, and the future application of technology to environmental data management. Motivating factors for EMIS include regulatory, business and IT drivers. Because of the ever-increasing regulatory burden, the need to demonstrate compliance often is the strongest driver. But they cannot ignore business and IT drivers from the discussion, especially with issues such as Enterprise Resource Planning and The Year 2000 impacting many systems projects. Before selecting a system, the organization should address, at a minimum, the following ten issues: (1) Organization objectives; (2) Organization readiness; (3) High-level processes to be automated; (4) Integration and interfaces; (5) User community and needs; (6) Technical requirements; (7) Degree of customization; (8) Project timing; (9) Implementation resource needs; and (10) System justification. Today, there are hundreds of EH and S software packages available too help automate daily business processes. Only a few are multimedia packages, and all require significant implementation efforts. The EMIS market is still evolving, and software vendors continue to enhance product features and usability.

  5. Compliance Framing - Framing Compliance

    OpenAIRE

    Lutz-Ulrich Haack; Martin C. Reimann

    2012-01-01

    Corporations have to install various organizational measures to comply with legal as well as internal guidelines systematically. Compliance management systems have the challenging task to make use of an internal compliance-marketing approach in order to ensure not only an adequate but also effective compliance-culture. Compliance-literature and findings of persuasive goal-framing-theory give opposite implications for establishing a rather values- versus rule-based compliance-culture respectiv...

  6. METHOD FOR SELECTION OF PROJECT MANAGEMENT APPROACH BASED ON FUZZY CONCEPTS

    Directory of Open Access Journals (Sweden)

    Igor V. KONONENKO

    2017-03-01

    Full Text Available Literature analysis of works that devoted to research of the selection a project management approach and development of effective methods for this problem solution is given. Mathematical model and method for selection of project management approach with fuzzy concepts of applicability of existing approaches are proposed. The selection is made of such approaches as the PMBOK Guide, the ISO21500 standard, the PRINCE2 methodology, the SWEBOK Guide, agile methodologies Scrum, XP, and Kanban. The number of project parameters which have a great impact on the result of the selection and measure of their impact is determined. Project parameters relate to information about the project, team, communication, critical project risks. They include the number of people involved in the project, the customer's experience with this project team, the project team's experience in this field, the project team's understanding of requirements, adapting ability, initiative, and others. The suggested method is considered on the example of its application for selection a project management approach to software development project.

  7. Combining AHP and DEA Methods for Selecting a Project Manager

    Directory of Open Access Journals (Sweden)

    Baruch Keren

    2014-07-01

    Full Text Available A project manager has a major influence on the success or failure of the project. A good project manager can match between the strategy and objectives of the organization and the goals of the project. Therefore, the selection of the appropriate project manager is a key factor for the success of the project. A potential project manager is judged by his or her proven performance and personal qualifications. This paper proposes a method to calculate the weighted scores and the full rank of candidates for managing a project, and to select the best of those candidates. The proposed method combines specific methodologies: the Data Envelopment Analysis (DEA and the Analytical Hierarchical Process (AHP and uses DEA Ranking Methods to enhance selection.

  8. Science to compliance: The WIPP success story

    International Nuclear Information System (INIS)

    Howarth, S.M.; Chu, M.S.; Shephard, L.E.

    1997-01-01

    The Waste Isolation Pilot Plant (WIPP) in southeast New Mexico has been studied as a transuranic waste repository for the past 23 years. During this time, an extensive site characterization, design, construction, and experimental program was completed to provide in-depth understanding of the dominant processes that are most likely to influence the containment of radionuclides for 10,000 years. The success of the program, however, is defined by the regulator in the context of compliance with performance criteria, rather than by the in-depth technical understanding typical of most scientific programs. The WIPP project was successful in making a transformation from science to compliance by refocusing and redirecting programmatic efforts toward the singular goal of meeting regulatory compliance requirements while accelerating the submittal of the Compliance Certification Application (CCA) by two months from the April 1994 Disposal Decision Plan (DDP) date of December 1996, and by reducing projected characterization costs by more than 40%. This experience is unparalleled within the radioactive waste management community and has contributed to numerous lessons learned from which the entire community can benefit

  9. 24 CFR 266.520 - Program monitoring and compliance.

    Science.gov (United States)

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.520 Program monitoring and compliance. HUD will monitor the...

  10. The Strategic Nature of Compliance

    DEFF Research Database (Denmark)

    König, Thomas; Mäder, Lars Kai

    2014-01-01

    by the anticipated enforcement decision of the monitoring agency and whether this agency is responsive to the probability of enforcement success and the potential sanctioning costs produced by noncomplying implementers. Compared to other monitoring systems, the centralized monitoring system of the European Union (EU......This compliance study models correct and timely implementation of policies in a multilevel system as a strategic game between a central monitoring agency and multiple implementers and evaluates statistically the empirical implications of this model. We test whether compliance is determined......) is praised for exemplary effectiveness, but our findings reveal that the monitoring agency refrains from enforcing compliance when the probability of success is low, and the sanctioning costs are high. This results in a compliance deficit, even though the selective enforcement activities of the monitoring...

  11. Compliance and treatment satisfaction of post menopausal women treated for osteoporosis. Compliance with osteoporosis treatment

    Directory of Open Access Journals (Sweden)

    Huas Dominique

    2010-08-01

    Full Text Available Abstract Background Adherence to anti-osteoporosis treatments is poor, exposing treated women to increased fracture risk. Determinants of poor adherence are poorly understood. The study aims to determine physician- and patient- rated treatment compliance with osteoporosis treatments and to evaluate factors influencing compliance. Methods This was an observational, cross-sectional pharmacoepidemiological study with a randomly-selected sample of 420 GPs, 154 rheumatologists and 110 gynaecologists practicing in France. Investigators included post-menopausal women with a diagnosis of osteoporosis and a treatment initiated in the previous six months. Investigators completed a questionnaire on clinical features, treatments and medical history, and on patient compliance. Patients completed a questionnaire on sociodemographic features, lifestyle, attitudes and knowledge about osteoporosis, treatment compliance, treatment satisfaction and quality of life. Treatment compliance was evaluated with the Morisky Medication-taking Adherence Scale. Variables collected in the questionnaires were evaluated for association with compliance using multivariate logistic regression analysis. Results 785 women were evaluated. Physicians considered 95.4% of the sample to be compliant, but only 65.5% of women considered themselves compliant. The correlation between patient and physician perceptions of compliance was low (κ: 0.11 [95% CI: 0.06 to 0.16]. Patient-rated compliance was highest for monthly bisphosphonates (79.7% and lowest for hormone substitution therapy (50.0%. Six variables were associated with compliance: treatment administration frequency, perceptions of long-term treatment acceptability, perceptions of health consequences of osteoporosis, perceptions of knowledge about osteoporosis, exercise and mental quality of life. Conclusion Compliance to anti-osteoporosis treatments is poor. Reduction of dosing regimen frequency and patient education may be useful

  12. ERM 593 Applied Project_Guidance for Reviewing and Approving a Waste Stream Profile in the Waste Compliance and Tracking System_Final_05-05-15

    Energy Technology Data Exchange (ETDEWEB)

    Elicio, Andy U. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-05-05

    My ERM 593 applied project will provide guidance for the Los Alamos National Laboratory Waste Stream Profile reviewer (i.e. RCRA reviewer) in regards to Reviewing and Approving a Waste Stream Profile in the Waste Compliance and Tracking System. The Waste Compliance and Tracking system is called WCATS. WCATS is a web-based application that “supports the generation, characterization, processing and shipment of LANL radioactive, hazardous, and industrial waste.” The LANL generator must characterize their waste via electronically by filling out a waste stream profile (WSP) in WCATS. Once this process is completed, the designated waste management coordinator (WMC) will perform a review of the waste stream profile to ensure the generator has completed their waste stream characterization in accordance with applicable state, federal and LANL directives particularly P930-1, “LANL Waste Acceptance Criteria,” and the “Waste Compliance and Tracking System User's Manual, MAN-5004, R2,” as applicable. My guidance/applied project will describe the purpose, scope, acronyms, definitions, responsibilities, assumptions and guidance for the WSP reviewer as it pertains to each panel and subpanel of a waste stream profile.

  13. U.S. Department of Energy Uranium Mill Tailings Remedial Action Ground Water Project: Project plan

    International Nuclear Information System (INIS)

    1994-09-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA Project processing sites. The compliance strategy for the processing sites must satisfy the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1987). This scope of work will entail the following activities on a site-specific basis: Develop a compliance strategy based on modification of the UMTRA Surface Project RAPs or develop Ground Water Project RAPs with NRC concurrence on the RAP and full participation of the affected states and tribes. Implement the RAP to include institutional controls, where appropriate, as an interim measure until compliance with the standards is achieved. Institute long-term verification monitoring for transfer to a separate long-term surveillance program on or before the Project end date. Prepare certification or confirmation reports and modify the long-term surveillance plan (LTSP), where needed, on those sites completed prior to the Project end date

  14. An application of ETICS Co-Scheduling Mechanism to Interoperability and Compliance Validation of Grid Services

    CERN Document Server

    Ronchieri, Elisabetta; Diez-andino Sancho, Guillermo; DI Meglio, Alberto; Marzolla, Moreno

    2008-01-01

    Grid software projects require infrastructures in order to evaluate interoperability with other projects and compliance with predefined standards. Interoperability and compliance are quality attributes that are expected from all distributed projects. ETICS is designed to automate the investigation of this kind of problems. It integrates well-established procedures, tools and resources in a coherent framework and adaptes them to the special needs of these projects. Interoperability and compliance to standards are important quality attributes of software developed for Grid environments where many different parts of an interconnected system have to interact. Compliance to standard is one of the major factors in making sure that interoperating parts of a distributed system can actually interconnect and exchange information. Taking the case of the Grid environment (Foster and Kesselman, 2003), most of the projects that are developing software have not reached the maturity level of other communities yet and have di...

  15. Selecting users for participation in IT projects

    DEFF Research Database (Denmark)

    Rasmussen, Rasmus; Christensen, Anders S.; Fjeldsted, Tobias

    2011-01-01

    The selection of users for participation in IT projects involves trade-offs between multiple criteria, one of which is selecting a representative cross-section of users. This criterion is basic because trading it for other criteria means basing designs on information biased toward some user groups...... at the expense of others. Based on interviews in development and customer organizations we find that their criteria for user selection favour persons who can contribute to the progress of the IT project over persons who are representative of the full range of users. A highly valued contribution from...... participating users is the ability to advocate a vision for the system and champion its organizational implementation. A survey in one customer organization shows that respondents’ personal traits explain up to 31% of the variation in their experience of aspects of the usability of a recently introduced system...

  16. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  17. Compliance monitoring in business processes: Functionalities, application, and tool-support.

    Science.gov (United States)

    Ly, Linh Thao; Maggi, Fabrizio Maria; Montali, Marco; Rinderle-Ma, Stefanie; van der Aalst, Wil M P

    2015-12-01

    In recent years, monitoring the compliance of business processes with relevant regulations, constraints, and rules during runtime has evolved as major concern in literature and practice. Monitoring not only refers to continuously observing possible compliance violations, but also includes the ability to provide fine-grained feedback and to predict possible compliance violations in the future. The body of literature on business process compliance is large and approaches specifically addressing process monitoring are hard to identify. Moreover, proper means for the systematic comparison of these approaches are missing. Hence, it is unclear which approaches are suitable for particular scenarios. The goal of this paper is to define a framework for Compliance Monitoring Functionalities (CMF) that enables the systematic comparison of existing and new approaches for monitoring compliance rules over business processes during runtime. To define the scope of the framework, at first, related areas are identified and discussed. The CMFs are harvested based on a systematic literature review and five selected case studies. The appropriateness of the selection of CMFs is demonstrated in two ways: (a) a systematic comparison with pattern-based compliance approaches and (b) a classification of existing compliance monitoring approaches using the CMFs. Moreover, the application of the CMFs is showcased using three existing tools that are applied to two realistic data sets. Overall, the CMF framework provides powerful means to position existing and future compliance monitoring approaches.

  18. Six Sigma Project Selection Using Fuzzy TOPSIS Decision Making Approach

    Directory of Open Access Journals (Sweden)

    Rajeev Rathi

    2015-05-01

    Full Text Available Six Sigma is considered as a logical business strategy that attempts to identify and eliminate the defects or failures for improving the quality of product and processes. A decision on project selection in Six Sigma is always very critical; it plays a key role in successful implementation of Six Sigma. Selection of a right Six Sigma project is essentially important for an automotive company because it greatly influences the manufacturing costs. This paper discusses an approach for right Six Sigma project selection at an automotive industry using fuzzy logic based TOPSIS method. The fuzzy TOPSIS is a well recognized tool to undertake the fuzziness of the data involved in choosing the right preferences. In this context, evaluation criteria have been designed for selection of best alternative. The weights of evaluation criteria are calculated by using the MDL (modified digital logic method and final ranking is calculated through priority index obtained by using fuzzy TOPSIS method. In the selected case study, this approach has rightly helped to identify the right project for implementing Six Sigma for achieving improvement in productivity.

  19. Resolving the problem of compliance with the ever increasing and changing regulations

    International Nuclear Information System (INIS)

    Leigh, H.

    1991-09-01

    The most common problem identified at several US Department of Energy (DOE) sites is regulatory compliance. Simply, the project viability depends on identifying regulatory requirements at the beginning of a specific project to avoid possible delays and cost overruns. The Radioisotope Power Systems Facility (RPSF) is using the Regulatory Compliance System (RCS) to deal with the problem that well over 1000 regulatory documents had to reviewed for possible compliance requirements applicable to the facility. This overwhelming number of possible documents is not atypical of all DOE facilities thus far reviewed using the RCS system. The RCS was developed to provide control and tracking of all the regulatory and institutional requirements on a given project. WASTREN, Inc., developed the RCS through various DOE contracts and continues to enhance and update the system for existing and new contracts. The RCS provides the information to allow the technical expert to assimilate and manage accurate resource information, compile the necessary checklists, and document that the project or facility fulfills all of the appropriate regulatory requirements. The RCS provides on-line information, including status throughout the project life, thereby allowing more intelligent and proactive decision making. Also, consistency and traceability are provided for regulatory compliance documentation. 1 ref., 1 fig

  20. Selecting a Sustainable Disinfection Technique for Wastewater Reuse Projects

    Directory of Open Access Journals (Sweden)

    Jorge Curiel-Esparza

    2014-09-01

    Full Text Available This paper presents an application of the Analytical Hierarchy Process (AHP by integrating a Delphi process for selecting the best sustainable disinfection technique for wastewater reuse projects. The proposed methodology provides project managers a tool to evaluate problems with multiple criteria and multiple alternatives which involve non-commeasurable decision criteria, with expert opinions playing a major role in the selection of these treatment technologies. Five disinfection techniques for wastewater reuse have been evaluated for each of the nine criteria weighted according to the opinions of consulted experts. Finally, the VIKOR method has been applied to determine a compromise solution, and to establish the stability of the results. Therefore, the expert system proposed to select the optimal disinfection alternative is a hybrid method combining the AHP with the Delphi method and the VIKOR technique, which is shown to be appropriate in realistic scenarios where multiple stakeholders are involved in the selection of a sustainable disinfection technique for wastewater reuse projects.

  1. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  2. A Methodology for Collective Evaluation and Selection of Industrial R&D Projects

    OpenAIRE

    Muhittin Oral; Ossama Kettani; Pascal Lang

    1991-01-01

    This paper proposes a methodology for evaluating and selecting R&D projects in a collective decision setting, especially useful at sectorial and national levels. It consists of two major phases: Evaluation and Selection. The evaluation process repeatedly uses mathematical programming models to determine the "relative values" of a given R&D project from the viewpoint of the other R&D projects. The selection process of R&D projects is based on these "relative values" and is done through a model...

  3. Procurement selection criteria for projects in the public sector: evidence from Nigeria

    Directory of Open Access Journals (Sweden)

    Richard Ajayi Jimoh

    2016-12-01

    Full Text Available The selection of suitable procurement practice for construction projects is a very complex and demanding tasks for stakeholders in the construction industry. In spite of the overabundance of techniques and tools accessible to the stakeholders in selecting an appropriate procurement method, clients are faced with the decision as to which of the selection criteria can be adopted for a given construction project to achieve project goals and objectives. This paper focused on evaluating the existing procurement methods being practised in the Nigerian construction industry with a view to identifying and establishing the parameters for selection that will improve contract delivery systems. In this research, quantitative approach was used to collect data from 420 contractors, consultants and clients based in the Federal Capital Territory, Abuja where large numbers of building projects are being procured. The findings revealed six most commonly considered criteria and deduced that, the quality, cost and duration of the project determines the type of procurement method to adopt. It is therefore stated that in selecting any particular procurement method for building construction projects, the complexity of such project should be clearly defined and the other performance indicators be given adequate consideration for a successful project delivery that will enhance the achievement of the client’s goal.

  4. Project governance: selected South African government experiments

    Directory of Open Access Journals (Sweden)

    G. van der Walt

    2008-07-01

    Full Text Available Some form of accountability and power structure binds all organisations. Such structures are typically referred to as the “governance” structure of the organisation. In organisations that have relatively mature project applications and methodologies in place, governance mechanisms are established on more permanent bases. With its focus on performance, results and outcomes, project governance establishes decision-making structures, as well as accountability and responsibility mechanisms in public institutions to oversee projects. As government institutions increasingly place emphasis on project applications for policy implementation and service delivery initiatives, mechanisms or structures should be established to facilitate clear interfaces between the permanent organisation and the temporary project organisation. Such mechanisms or structures should enhance the governance of projects, that is, the strategic alignment of projects, the decentralisation of decision- making powers, rapid resource allocation, and the participation of external stakeholders. The purpose of this article is to explore the concept “project governance”, and to highlight examples of project governance as applied in selected government departments in provincial and national spheres. This would enable the establishment of best practice examples and assist to develop benchmarks for effective project applications for service delivery improvement.

  5. Applying the Analytic Hierarchy Process to Oil Sands Environmental Compliance Risk Management

    Science.gov (United States)

    Roux, Izak Johannes, III

    Oil companies in Alberta, Canada, invested $32 billion on new oil sands projects in 2013. Despite the size of this investment, there is a demonstrable deficiency in the uniformity and understanding of environmental legislation requirements that manifest into increased project compliance risks. This descriptive study developed 2 prioritized lists of environmental regulatory compliance risks and mitigation strategies and used multi-criteria decision theory for its theoretical framework. Information from compiled lists of environmental compliance risks and mitigation strategies was used to generate a specialized pairwise survey, which was piloted by 5 subject matter experts (SMEs). The survey was validated by a sample of 16 SMEs, after which the Analytic Hierarchy Process (AHP) was used to rank a total of 33 compliance risks and 12 mitigation strategy criteria. A key finding was that the AHP is a suitable tool for ranking of compliance risks and mitigation strategies. Several working hypotheses were also tested regarding how SMEs prioritized 1 compliance risk or mitigation strategy compared to another. The AHP showed that regulatory compliance, company reputation, environmental compliance, and economics ranked the highest and that a multi criteria mitigation strategy for environmental compliance ranked the highest. The study results will inform Alberta oil sands industry leaders about the ranking and utility of specific compliance risks and mitigations strategies, enabling them to focus on actions that will generate legislative and public trust. Oil sands leaders implementing a risk management program using the risks and mitigation strategies identified in this study will contribute to environmental conservation, economic growth, and positive social change.

  6. Compliance Monitoring of Underwater Blasting for Rock Removal at Warrior Point, Columbia River Channel Improvement Project, 2009/2010

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.; Woodley, Christa M.; Skalski, J. R.; Seaburg, Adam

    2011-05-10

    The U.S. Army Corps of Engineers, Portland District (USACE) conducted the 20-year Columbia River Channel Improvement Project (CRCIP) to deepen the navigation channel between Portland, Oregon, and the Pacific Ocean to allow transit of fully loaded Panamax ships (100 ft wide, 600 to 700 ft long, and draft 45 to 50 ft). In the vicinity of Warrior Point, between river miles (RM) 87 and 88 near St. Helens, Oregon, the USACE conducted underwater blasting and dredging to remove 300,000 yd3 of a basalt rock formation to reach a depth of 44 ft in the Columbia River navigation channel. The purpose of this report is to document methods and results of the compliance monitoring study for the blasting project at Warrior Point in the Columbia River.

  7. Ecological Monitoring and Compliance Program Fiscal Year 2001

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Wills

    2001-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early

  8. Compliance with removable orthodontic appliances.

    Science.gov (United States)

    Shah, Nirmal

    2017-12-22

    Data sourcesMedline via OVID, PubMed, Cochrane Central Register of Controlled Trials, Web of Science Core Collection, LILACS and BBO databases. Unpublished clinical trials accessed using ClinicalTrials.gov, National Research Register, ProQuest Dissertation and Thesis database.Study selectionTwo authors searched studies from inception until May 2016 without language restrictions. Quantitative and qualitative studies incorporating objective data on compliance with removable appliances, barriers to appliance wear compliance, and interventions to improve compliance were included.Data extraction and synthesisQuality of research was assessed using the Cochrane Collaboration's risk of bias tool, the risk of bias in non-randomised studies of interventions (ROBINS-I), and the mixed methods appraisal tool. Statistical heterogeneity was investigated by examining a graphic display of the estimated compliance levels in conjunction with 95% confidence intervals and quantified using the I-squared statistic. A weighted estimate of objective compliance levels for different appliances in relation to stipulated wear and self-reported levels was also calculated. Risk of publication bias was assessed using funnel plots. Meta-regression was undertaken to assess the relative effects of appliance type on compliance levels.ResultsTwenty-four studies met the inclusion criteria. Of these, 11 were included in the quantitative synthesis. The mean duration of objectively measured wear was considerably lower than stipulated wear time amongst all appliances. Headgear had the greatest discrepancy (5.81 hours, 95% confidence interval, 4.98, 6.64). Self-reported wear time was consistently higher than objectively measured wear time amongst all appliances. Headgear had the greatest discrepancy (5.02 hours, 95% confidence interval, 3.64, 6.40). Two studies found an increase in compliance with headgear and Hawley retainers when patients were aware of monitoring. Five studies found younger age groups to

  9. Ecological Monitoring and Compliance Program Fiscal Year 1998 Report

    International Nuclear Information System (INIS)

    Bechtel Nevada Ecological Services

    1998-01-01

    The Ecological Monitoring and Compliance program, funded through the U. S. Department of Energy/Nevada Operations Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1998. Twenty-one sites for seven projects were surveyed for the presence of state or federally protected species. Three projects were in or near habitat of the threatened desert tortoise and required special clearance and transect surveys. All geospatial data collected were entered into Bechtel Nevada's Ecological Geographic Information system for use in ongoing ecosystem management of the NTS

  10. Applicability of federal and state environmental requirements to selected DOE field installations and recommendations for development of generic compliance guidance. Final report

    International Nuclear Information System (INIS)

    1982-01-01

    This final report identifies and describes federal and state environmental requirements applicable to selected Department of Energy (DOE) nuclear field installations, establishes priorities for the requirements, determines the need for development of additional compliance guidance, and recommends development of compliance guidance for specific priority requirements. Compliance guidance developed as part of the study is summarized. The applicability of environmental requirements to 12 DOE field installations was reviewed. Five installations were examined under Task 4. They are: Nevada Test Site; Lawrence Berkeley Laboratory; Paducah Gaseous Diffusion Plant; Oak Ridge Y-12 Plant; and Los Alamos Scientific Laboratory. Seven other installations were reviewed under Task 2 and included: Idaho National Engineering Laboratory; Hanford; Savannah River Plant; Oak Ridge Gaseous Diffusion Plant; Pantex Plant; Rocky Flats Plant; and Lawrence Livermore Laboratory. This report combines results of the two tasks. The objective of the study was to identify the set of environmental requirements which are applicable to DOE field installations, track changes in the requirements, and prepare compliance guidance for important requirements and important regulatory developments as necessary. A cumulative calendar update for July 1982 represents the current status of applicable requirements. Environmental profiles of each facility, along with ambient monitoring results, are presented. Applicable federal requirements are identified. The specific applicability of federal and state requirements is detailed for each installation. Compliance guidance available from various agencies is described. Each requirement described is ranked by priority, and recommendations are made for development of additional guidance

  11. An analysis of project selection and assignment criteria of Danish tenders in Europe

    Directory of Open Access Journals (Sweden)

    Jasper Kranker Larsen

    2013-12-01

    Full Text Available Public construction agencies are one of the largest developers within the Danish construction industry, where such agencies own and develop new public construction projects. Most of these projects are put out in European tender. This study analyses the selection and assignment criteria employed by these agencies in different types of public sector projects. Some of the objectives pursued by the study include the determination of 1/ the selection and assignment criteria mostly used in Danish public tenders 2/ how different types of projects use selection and assignment criteria in the bidding process, and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period: January 2010 to March 2013. Fisher's Exact Test was conducted to determine if there was any significant use of some selection and assignment criteria. The findings of the study showed that invited tenders with pre-qualification and lowest price in 69.8% of the tenders are the most used selection and assignment criteria, with little regard to project type.

  12. Breathing circuit compliance and accuracy of displayed tidal volume during pressure-controlled ventilation of infants: A quality improvement project.

    Science.gov (United States)

    Glenski, Todd A; Diehl, Carrie; Clopton, Rachel G; Friesen, Robert H

    2017-09-01

    Anesthesia machines have evolved to deliver desired tidal volumes more accurately by measuring breathing circuit compliance during a preuse self-test and then incorporating the compliance value when calculating expired tidal volume. The initial compliance value is utilized in tidal volume calculation regardless of whether the actual compliance of the breathing circuit changes during a case, as happens when corrugated circuit tubing is manually expanded after the preuse self-test but before patient use. We noticed that the anesthesia machine preuse self-test was usually performed on nonexpanded pediatric circuit tubing, and then the breathing circuit was subsequently expanded for clinical use. We aimed to demonstrate that performing the preuse self-test in that manner could lead to incorrectly displayed tidal volume on the anesthesia machine monitor. The goal of this quality improvement project was to change the usual practice and improve the accuracy of displayed tidal volume in infants undergoing general anesthesia. There were four stages of the project: (i) gathering baseline data about the performance of the preuse self-test and using infant and adult test lungs to measure discrepancies of displayed tidal volumes when breathing circuit compliance was changed after the initial preuse self-test; (ii) gathering clinical data during pressure-controlled ventilation comparing anesthesia machine displayed tidal volume with actual spirometry tidal volume in patients less than 10 kg before (machine preuse self-test performed while the breathing circuit was nonexpanded) and after an intervention (machine preuse self-test performed after the breathing circuit was fully expanded); (iii) performing department-wide education to help implement practice change; (iv) gathering postintervention data to determine the prevalence of proper machine preuse self-test. At constant pressure-controlled ventilation through fully expanded circuit tubing, displayed tidal volume was 83

  13. Ecological Monitoring and Compliance Program Fiscal Year 2002 Report

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Wills

    2002-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species and important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species

  14. Environmental compliance considerations for the management of cultural resources

    International Nuclear Information System (INIS)

    Curtis, S.A.; Whitfield, S.; McGinnis, K.

    1987-01-01

    This paper examines three key considerations underlying the programmatic management of cultural resources that may be affected by a large federal project. These considerations are statutory background and the compliance process, cultural resource compliance tasks, and quality assurance. The first consideration addresses the legal requirements and steps that must be met and taken for federal agencies to fulfill their cultural resource compliance responsibilities. The second consideration focuses on the tasks that must be performed by technical specialists to facilitate related federal and state compliance actions. The third consideration ensures that compliance requirements are being properly fulfilled. In the technical literature and compliance planning, archaeological and historic sites and Native American cultural resources are grouped under the general heading of cultural resources. Also included under this heading are the traditions and resources of Folk societies. Cultural resources encompass both material and nonmaterial aspects of our cultural heritage and include buildings, structures, objects, sites, districts, archaeological resources, places of religious importance, and unique, distinctive, or unusual lifeways. For compliance purposes, it is useful to treat these resources within four roughly chronological culture-historical periods: prehistoric, ethnohistoric, historic, and contemporary. 6 refs., 6 tabs

  15. Applying a Hybrid MCDM Model for Six Sigma Project Selection

    Directory of Open Access Journals (Sweden)

    Fu-Kwun Wang

    2014-01-01

    Full Text Available Six Sigma is a project-driven methodology; the projects that provide the maximum financial benefits and other impacts to the organization must be prioritized. Project selection (PS is a type of multiple criteria decision making (MCDM problem. In this study, we present a hybrid MCDM model combining the decision-making trial and evaluation laboratory (DEMATEL technique, analytic network process (ANP, and the VIKOR method to evaluate and improve Six Sigma projects for reducing performance gaps in each criterion and dimension. We consider the film printing industry of Taiwan as an empirical case. The results show that our study not only can use the best project selection, but can also be used to analyze the gaps between existing performance values and aspiration levels for improving the gaps in each dimension and criterion based on the influential network relation map.

  16. Ecological Monitoring and Compliance Program Fiscal Year 1998 Report

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada Ecological Services

    1998-10-01

    The Ecological Monitoring and Compliance program, funded through the U. S. Department of Energy/Nevada Operations Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1998. Twenty-one sites for seven projects were surveyed for the presence of state or federally protected species. Three projects were in or near habitat of the threatened desert tortoise and required special clearance and transect surveys. All geospatial data collected were entered into Bechtel Nevada's Ecological Geographic Information system for use in ongoing ecosystem management of the NTS.

  17. 7 CFR 1901.204 - Compliance reviews.

    Science.gov (United States)

    2010-01-01

    ... Housing Project. (ii) The borrower's method of advertising the facility to the public, if there is any advertising, including how well these methods reach the minority community. (iii) Any records of request for... Director will immediately send a copy of the compliance review report to the Administrator, Attention...

  18. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  19. Selecting downscaled climate projections for water resource impacts and adaptation

    Science.gov (United States)

    Vidal, Jean-Philippe; Hingray, Benoît

    2015-04-01

    Increasingly large ensembles of global and regional climate projections are being produced and delivered to the climate impact community. However, such an enormous amount of information can hardly been dealt with by some impact models due to computational constraints. Strategies for transparently selecting climate projections are therefore urgently needed for informing small-scale impact and adaptation studies and preventing potential pitfalls in interpreting ensemble results from impact models. This work proposes results from a selection approach implemented for an integrated water resource impact and adaptation study in the Durance river basin (Southern French Alps). A large ensemble of 3000 daily transient gridded climate projections was made available for this study. It was built from different runs of 4 ENSEMBLES Stream2 GCMs, statistically downscaled by 3 probabilistic methods based on the K-nearest neighbours resampling approach (Lafaysse et al., 2014). The selection approach considered here exemplifies one of the multiple possible approaches described in a framework for identifying tailored subsets of climate projections for impact and adaptation studies proposed by Vidal & Hingray (2014). It was chosen based on the specificities of both the study objectives and the characteristics of the projection dataset. This selection approach aims at propagating as far as possible the relative contributions of the four different sources of uncertainties considered, namely GCM structure, large-scale natural variability, structure of the downscaling method, and catchment-scale natural variability. Moreover, it took the form of a hierarchical structure to deal with the specific constraints of several types of impact models (hydrological models, irrigation demand models and reservoir management models). The implemented 3-layer selection approach is therefore mainly based on conditioned Latin Hypercube sampling (Christierson et al., 2012). The choice of conditioning

  20. Ecological Monitoring and Compliance Program Fiscal Year 2001 report

    International Nuclear Information System (INIS)

    Wills, C.A.

    2001-01-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early April. A

  1. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  2. Site selection for controversial projects: reflections on the MRS experience

    International Nuclear Information System (INIS)

    Sigmon, E.B.; Marland, G.

    1987-01-01

    Projects for waste management, power production, and a host of other socially useful functions frequently falter because of local opposition. Students of the siting dilemma have prescribed accommodation of local interests through negotiation and compensation, but they offer little advice on the site selection itself. The negotiated compensation approach to siting frequently fails because localities refuse to negotiate. The authors argue that methods of site selection and developers' initial stance toward local communities affect communities' propensity to negotiate. Site selection strategies and their influence on project acceptability are examined, using the Department of Energy's Monitored Retrievable Storage proposal as a point of departure. 14 refs

  3. HWVP compliance with the Hanford site solid waste acceptance criteria

    International Nuclear Information System (INIS)

    Bromm, R.; Ornelas, J.; Fundingsland, S.; Shah, K.

    1993-01-01

    In order to ensure that the Hanford Waste Vitrification Project (HWVP) will meet solid waste acceptance criteria, a review of the criteria was performed. The primary purpose of the study was to evaluate the modifications that will be required to bring the HWVP into compliance for secondary waste which will be generated during normal operations of the facility. To accomplish this objective, the current HWVP design was evaluated based on the criteria established. Once the non-compliance areas and potentially non-compliance areas were identified, alternative plant design modifications were proposed. This paper summarizes the results and recommendations of that study

  4. Environmental projects. Volume 3: Environmental compliance audit

    Science.gov (United States)

    1987-01-01

    The Goldstone Deep Space Communications Complex is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Activities at Goldstone are carried out in support of six large parabolic dish antennas. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL and Goldstone have adopted a position that their operating installations shall maintain a high level of compliance with Federal, state, and local laws governing the management of hazardous substances, abestos, and underground storage tanks. A JPL version of a document prepared as an environmental audit of Goldstone operations is presented. Both general and specific items of noncompliance at Goldstone are identified and recommendations are provided for corrective actions.

  5. 42 CFR 137.368 - Is the Secretary responsible for oversight and compliance of health and safety codes during...

    Science.gov (United States)

    2010-10-01

    ... compliance of health and safety codes during construction projects being performed by a Self-Governance Tribe... SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and Implementing Construction Project Agreements § 137.368 Is the Secretary responsible for oversight and compliance of health...

  6. 28 CFR 73.4 - Partial compliance not deemed compliance.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Partial compliance not deemed compliance. 73.4 Section 73.4 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) NOTIFICATIONS TO THE ATTORNEY GENERAL BY AGENTS OF FOREIGN GOVERNMENTS § 73.4 Partial compliance not deemed compliance. The fact...

  7. Strategic project selection based on evidential reasoning approach for high-end equipment manufacturing industry

    Directory of Open Access Journals (Sweden)

    Lu Guangyan

    2017-01-01

    Full Text Available With the rapid development of science and technology, emerging information technologies have significantly changed the daily life of people. In such context, strategic project selection for high-end equipment manufacturing industries faces more and more complexities and uncertainties with the consideration of several complex criteria. For example, a group of experts rather than a single expert should be invited to select strategic project for high-end equipment manufacturing industries and the experts may feel difficulty to express their preferences towards different strategic projects due to their limited cognitive capabilities. In order to handle these complexities and uncertainties, the criteria framework of strategic project selection is firstly constructed based on the characteristics of high-end equipment manufacturing industries and then evidential reasoning (ER approach is introduced in this paper to help experts express their uncertain preferences and aggregate these preferences to generate an appropriate strategic project. A real case of strategic project selection in a high-speed train manufacturing enterprise is investigated to demonstrate the validity of the ER approach in solving strategic project selection problem.

  8. Tax Compliance Inventory: TAX-I Voluntary tax compliance, enforced tax compliance, tax avoidance, and tax evasion

    Science.gov (United States)

    Kirchler, Erich; Wahl, Ingrid

    2010-01-01

    Surveys on tax compliance and non-compliance often rely on ad hoc formulated items which lack standardization and empirical validation. We present an inventory to assess tax compliance and distinguish between different forms of compliance and non-compliance: voluntary versus enforced compliance, tax avoidance, and tax evasion. First, items to measure voluntary and enforced compliance, avoidance, and evasion were drawn up (collected from past research and newly developed), and tested empirically with the aim of producing four validated scales with a clear factorial structure. Second, findings from the first analyses were replicated and extended to validation on the basis of motivational postures. A standardized inventory is provided which can be used in surveys in order to collect data which are comparable across research focusing on self-reports. The inventory can be used in either of two ways: either in its entirety, or by applying the single scales independently, allowing an economical and fast assessment of different facets of tax compliance. PMID:20502612

  9. Tax Compliance Inventory: TAX-I Voluntary tax compliance, enforced tax compliance, tax avoidance, and tax evasion.

    Science.gov (United States)

    Kirchler, Erich; Wahl, Ingrid

    2010-06-01

    Surveys on tax compliance and non-compliance often rely on ad hoc formulated items which lack standardization and empirical validation. We present an inventory to assess tax compliance and distinguish between different forms of compliance and non-compliance: voluntary versus enforced compliance, tax avoidance, and tax evasion. First, items to measure voluntary and enforced compliance, avoidance, and evasion were drawn up (collected from past research and newly developed), and tested empirically with the aim of producing four validated scales with a clear factorial structure. Second, findings from the first analyses were replicated and extended to validation on the basis of motivational postures. A standardized inventory is provided which can be used in surveys in order to collect data which are comparable across research focusing on self-reports. The inventory can be used in either of two ways: either in its entirety, or by applying the single scales independently, allowing an economical and fast assessment of different facets of tax compliance.

  10. Selection of executors for realization of individual tasks of the project

    Directory of Open Access Journals (Sweden)

    Asanov Askhat

    2017-01-01

    Full Text Available This article deals with the task of selection of executors for the realization of individual tasks of a new project. A short review of approaches to the estimation of personnel based on intellectual methods is provided. Two approaches to the task solution of executors’ selection are reviewed. The first approach allows considering estimation of competence of potential executors and data about projects that have already been realized. These data and requirements to the tasks of new projects are presented with the help of cognitive map with correspondent vertices. In the article, a methodologic example of the suggested approach use is introduced. The second approach suggests the use of Hopfield’s neural network. Neural networks allow using the already available experience of project activities during realization of new projects.

  11. Sales Tax Compliance and Audit Selection

    OpenAIRE

    Murray, Matthew N.

    1995-01-01

    Uses sample selection estimation techniques to identify systematic audit selection rules and determinants of sales tax underreporting. Though based on data from only one state (Tennessee), outcomes are useful in developing and evaluating audit selection results.

  12. A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Yongyi Shou

    2014-01-01

    Full Text Available A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent’s energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resource-constrained project portfolio selection and scheduling problem.

  13. Exploring project selection behavior of academic scientists in India

    OpenAIRE

    Anju Chawla

    2007-01-01

    This study is based on retrospective accounts of a stratified sample of about 1,100 academic scien-tists in India on the criteria actually used by them in the choice of research projects. A basic objective is to examine the effects of contextual factors such as academic rank, institutional and disciplinary setting, and sources of research funds on the choice of research projects. A struc-tured questionnaire was used to tap the criteria for project selection. The items were factor-analyzed and...

  14. Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors

    Directory of Open Access Journals (Sweden)

    Xiang Ding

    2014-01-01

    Full Text Available Project delivery planning is a key stage used by the project owner (or project investor for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.

  15. Treatment compliance and challenges among tuberculosis patients across selected health facilities in Osun State Nigeria.

    Science.gov (United States)

    Ajao, K O; Ogundun, O A; Afolabi, O T; Ojo, T O; Atiba, B P; Oguntunase, D O

    2014-12-01

    Tuberculosis (TB) is a major public health problem in the world and Africa has approximately one quarter of the world's cases. One of the greatest challenges facing most TB programmes is the non-compliance to TB treatment among TB patients. This study aimed at determining the challenges of management of tuberculosis (TB) across selected Osun State health facilities. The study employed a descriptive cross-sectional design. A semi-structured questionnaire was used to collect data from 102 TB patients in the health facilities. The instrument measured socio-demographic variables, patient related factors, socio-economic variables, health care system related factors to TB disease and treatment. Data were analysed and summarized using descriptive and inferential statistics. Statistical significance was placed at p facilities (χ2 = 21.761, p facility and patient-related factors were largely responsible.

  16. Environmental Compliance Management System

    International Nuclear Information System (INIS)

    Brownson, L.W.; Krsul, T.; Peralta, R.A.; Knudson, D.A.; Rosignolo, C.L.

    1992-01-01

    Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy

  17. Compliance with building energy regulations for new-build dwellings

    International Nuclear Information System (INIS)

    Pan, Wei; Garmston, Helen

    2012-01-01

    Despite increasingly stringent building energy regulations worldwide, non-compliance exists in practice. This paper examines the profile of compliance with building energy regulations for new-build dwellings. In total 404 new-build dwellings completed in the UK from 2006 to 2009 were investigated. Only a third of these dwellings were evidenced as being compliant with Building Regulations Part L (England and Wales). Such low compliance casts a serious concern over the achievability of the UK Government's target for all new-build homes to be ‘zero carbon’ from 2016. Clearly evidenced was a lack of knowledge of Part L and its compliance requirements among the supply and building control sides of new-build dwellings. The results also indicate that the compliance profile was influenced by factors including Standard Assessment Procedure (UK Government's methodology for energy efficiency) calculation submissions, learning and experience of builders and building controls with Part L, use of Part L1A checklist, the introduction of energy performance certificate (EPC), build method, dwelling type, and project size. Better compliance was associated with flats over houses and timber frame over masonry. The use of EPC and Part L1A checklist should be encouraged. Key to addressing the lack of compliance with building energy regulations is training. -- Highlights: ► There exists a lack of compliance, worldwide, with building energy regulations. ► The implementation of England and Wales building energy regulations is problematic. ► Training, learning and experience of builders and building control are critical. ► Energy performance certificate and Part L 2006 checklist helped achieve compliance. ► Flats achieved better compliance over houses; and timber frame over masonry.

  18. Ecological Monitoring and Compliance Program 2007 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Dennis; Anderson, David; Derek, Hall; Greger, Paul; Ostler, W. Kent

    2008-03-01

    In accordance with U.S. Department of Energy (DOE) Order 450.1, 'Environmental Protection Program', the Office of the Assistant Manager for Environmental Management of the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) requires ecological monitoring and biological compliance support for activities and programs conducted at the Nevada Test Site (NTS). National Security Technologies, LLC (NSTec), Ecological Services has implemented the Ecological Monitoring and Compliance (EMAC) Program to provide this support. EMAC is designed to ensure compliance with applicable laws and regulations, delineate and define NTS ecosystems, and provide ecological information that can be used to predict and evaluate the potential impacts of proposed projects and programs on those ecosystems. This report summarizes the EMAC activities conducted by NSTec during calendar year 2007. Monitoring tasks during 2007 included eight program areas: (a) biological surveys, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) biological monitoring at the Nonproliferation Test and Evaluation Complex (NPTEC). The following sections of this report describe work performed under these eight areas.

  19. Scrubbers: A popular Phase I compliance strategy

    International Nuclear Information System (INIS)

    Fink, C.E.; Bissell, P.E.; Koch, B.J.; Rutledge, G.D.

    1992-01-01

    As utilities commit to compliance plans to meet the Phase I requirements of the Clean Air Act Amendments of 1990, there are indications that scrubbing may account for up to 50 percent of the total SO 2 reductions in Phase I. This paper presents and analyzes the critical reasons that explain how and why scrubber-based compliance strategies have developed into the least-cost option in Phase I for many utilities. A hypothetical utility system was simulated to study the impacts of various technological, legislative, and regulatory issues on compliance decisions and costs. Issues evaluated using the hypothetical system include the emissions cap, Clean Air Act and state incentives to scrub, improvements in scrubber technology and costs, and the integration of Phase I and II compliance strategies by the phased installation of scrubbers. In combination, these considerations increase the attractiveness of scrubbers during the 1995-1999 Phase I period. Other considerations that will ultimately influence the amount of Phase I scrubbing capacity include the additional power generation costs associated with fuel switching, the uncertainty of low-sulfur coal price projections, fuel supply flexibility, scrubber market aspects, and socioeconomic considerations

  20. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  1. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  2. Knowledge, opinions and compliance related to the 100% smoke-free law in hospitality venues in Kampala, Uganda: cross-sectional results from the KOMPLY Project.

    Science.gov (United States)

    Gravely, Shannon; Nyamurungi, Kellen Namusisi; Kabwama, Steven Ndugwa; Okello, Gabriel; Robertson, Lindsay; Heng, Kelvin Khow Chuan; Ndikum, Achiri Elvis; Oginni, Adeniyi Samuel; Rusatira, Jean Christophe; Kakoulides, Socrates; Huffman, Mark D; Yusuf, Salim; Bianco, Eduardo

    2018-01-05

    This study evaluated knowledge, opinions and compliance related to Uganda's comprehensive smoke-free law among hospitality venues in Kampala Uganda. This multi-method study presents cross-sectional findings of the extent of compliance in the early phase of Uganda's comprehensive smoke-free law (2 months postimplementation; pre-enforcement). Bars, pubs and restaurants in Kampala Uganda. A two-stage stratified cluster sampling procedure was used to select hospitality sites stratified by all five divisions in Kampala. A total of 222 establishments were selected for the study. One hospitality representative from each of the visited sites agreed to take part in a face-to-face administered questionnaire. A subsample of hospitality venues were randomly selected for tobacco air quality testing (n=108). Data were collected between June and August 2016. Knowledge and opinions of the smoke-free law among hospitality venue staff and owners. The level of compliance with the smoke-free law in hospitality venues through: (1) systematic objective observations (eg, active smoking, the presence of designated smoking areas, 'no smoking' signage) and (2) air quality by measuring the levels of tobacco particulate matter (PM 2.5 ) in both indoor and outdoor venues. Active smoking was observed in 18% of venues, 31% had visible 'no smoking' signage and 47% had visible cigarette remains. Among interviewed respondents, 57% agreed that they had not been adequately informed about the smoke-free law; however, 90% were supportive of the ban. Nearly all respondents (97%) agreed that the law will protect workers' health, but 32% believed that the law would cause financial losses at their establishment. Indoor PM 2.5 levels were hazardous (267.6 µg/m 3 ) in venues that allowed smoking and moderate (29.6 µg/m 3 ) in smoke-free establishments. In the early phase of Uganda's smoke-free law, the level of compliance in hospitality venues settings in Kampala was suboptimal. Civil society and the

  3. Ecological Monitoring and Compliance Program 2006 Report

    Energy Technology Data Exchange (ETDEWEB)

    David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

    2007-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows

  4. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  5. EPRtm project experience: selection of partners and supply chain

    International Nuclear Information System (INIS)

    Lorenzo, D. de

    2012-01-01

    With 4 EPR T M units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  6. Selecting Large Portfolios of Social Projects in Public Organizations

    Directory of Open Access Journals (Sweden)

    Igor Litvinchev

    2014-01-01

    Full Text Available We address the portfolio selection of social projects in public organizations considering interdependencies (synergies affecting project funds requirements and tasks. A mixed integer linear programming model is proposed incorporating the most relevant aspects of the problem found in the literature. The model supports both complete (all or nothing and partial (a certain amount from a given interval of funding resource allocation policies. Numerical results for large-scale problem instances are presented.

  7. NPD project portfolio selection using reinvestment strategy in competitive environment

    Directory of Open Access Journals (Sweden)

    Alireza Ghassemi

    2018-01-01

    Full Text Available This study aims to design a new model for selecting most fitting new product development projects in a pool of projects. To catch the best model, we assume new products will be introduced to the competitive markets. Also, we suppose the revenue yielded by completed projects can be reinvested on implementation of other projects. Other sources of financing are borrowing loans from banks and initial capital of the firm. These limited resources determine most evaluated projects to be performed. Several types of interactions among different projects are considered to make the chosen projects more like a portfolio. In addition, some numerical examples from the real world are provided to demonstrate the applicability of the proposed model. These examples show how the particular considerations in the suggested model affect the results.

  8. Acid rain compliance planning using decision analysis

    International Nuclear Information System (INIS)

    Norris, C.; Sweet, T.; Borison, A.

    1991-01-01

    Illinois Power Company (IP) is an investor-owned electric and natural gas utility serving portions of downstate Illinois. In addition to one nuclear unit and several small gas and/or oil-fired units, IP has ten coal-fired units. It is easy to understand the impact the Clean Air Act Amendments of 1990 (CAAA) could have on IP. Prior to passage of the CAAA, IP formed several teams to evaluate the specific compliance options at each of the high sulfur coal units. Following that effort, numerous economic analyses of compliance strategies were conducted. The CAAA have introduced a new dimension to planning under uncertainty. Not only are many of the familiar variables uncertain, but the specific form of regulation, and indeed, the compliance goal itself is hard to define. For IP, this led them to use techniques not widely used within their corporation. This paper summarizes the analytical methods used in these analyses and the preliminary results as of July, 1991. The analysis used three approaches to examine the acid rain compliance decision. These approaches were: (1) the 'most-likely,' or single-path scenario approach; (2) a multi-path strategy analysis using the strategies defined in the single-scenario analysis; and (3) a less constrained multi-path option analysis which selects the least cost compliance option for each unit

  9. Mobile Source Emissions Regulatory Compliance Data Inventory

    Science.gov (United States)

    The Mobile Source Emissions Regulatory Compliance Data Inventory data asset contains measured summary compliance information on light-duty, heavy-duty, and non-road engine manufacturers by model, as well as fee payment data required by Title II of the 1990 Amendments to the Clean Air Act, to certify engines for sale in the U.S. and collect compliance certification fees. Data submitted by manufacturers falls into 12 industries: Heavy Duty Compression Ignition, Marine Spark Ignition, Heavy Duty Spark Ignition, Marine Compression Ignition, Snowmobile, Motorcycle & ATV, Non-Road Compression Ignition, Non-Road Small Spark Ignition, Light-Duty, Evaporative Components, Non-Road Large Spark Ignition, and Locomotive. Title II also requires the collection of fees from manufacturers submitting for compliance certification. Manufacturers submit data on an annual basis, to document engine model changes for certification. Manufacturers also submit compliance information on already certified in-use vehicles randomly selected by the EPA (1) year into their life and (4) years into their life to ensure that emissions systems continue to function appropriately over time.The EPA performs targeted confirmatory tests on approximately 15% of vehicles submitted for certification. Confirmatory data on engines is associated with its corresponding submission data to verify the accuracy of manufacturer submission beyond standard business rules.Section 209 of the 1990 Amendments to the Clea

  10. Developing an environmental compliance program for accelerator production of tritium

    International Nuclear Information System (INIS)

    Reynolds, R.W.; Roberts, J.S.; Dyer, K.W.; Shedrow, C.B.; Sheetz, S.O.; England, J.L.

    1998-01-01

    This paper addresses the development of an environmental program for a large proposed federal project currently in the preliminary design phase, namely, the accelerator production of tritium (APT) for the US Department of Energy (DOE). This project is complicated not only by its size ($3.5 to $4.5 billion) but also by its technical complexity and one-of-a-kind nature. This is further complicated by the fact that government projects are driven by budgets subject to public pressures and annual Congressional fiscal considerations, whereas private companies are driven by profits. The measure of success for a federal project such as the APT is based on level of public support, not profits. Finally, there are not too many equivalent environmental programs that could be used as models, and benchmarking is nearly impossible. Forming an environmental program during the conceptual design phase of this large federal project included the formation of a core environmental working group (EWG). The group has membership from all major project organizations with a charter formally recognized by the project director. The envelope for traditional environmental work for the APT project has been stretched to include teaming with management in the establishment of project goals and direction. The APT EWG was set up organizationally to include several subgroups or teams that do the real work of assessing, establishing the regulatory framework, and then developing a compliance program. Setting aside the organizational difficulties of selecting the right team leads and members, each team was tasked with developing a charter, plan, and schedule. Since then, each team has developed an appropriate level of supporting documentation to address its particular issues and requirements

  11. Transparent national strategies for long-term decarbonization in compliance with the 2 deg. C goal: The Deep Decarbonization Pathways Project

    International Nuclear Information System (INIS)

    Colombier, Michel; Waisman, Henri

    2015-01-01

    Fifteen countries among the biggest emitters of greenhouse gases are involved in the Deep Decarbonization Pathways Project (DDPP), which is based on 'country teams' of climate experts. This international project seeks to draw the pathways for a transition toward national decarbonization in compliance with the goal of limiting global warming to 2 deg. C maximum by 2050. These pathways should serve to: a) foresee the economic, technical and behavioral 'ruptures' to be addressed in order to facilitate the transition; b) identify specifically national factors in pathways toward decarbonization; and c) analyze the effects over time of this transition and the sequencing of the measures that might cause them. A preliminary report was released in September 2014, and the final report is scheduled for mid-2015. In support of an international agreement during the Paris Climate Conference, it will focus on the implications of deep decarbonization and the conditions for achieving it

  12. NASA: Assessments of Selected Large-Scale Projects

    Science.gov (United States)

    2011-03-01

    REPORT DATE MAR 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Assessments Of Selected Large-Scale Projects...Volatile EvolutioN MEP Mars Exploration Program MIB Mishap Investigation Board MMRTG Multi Mission Radioisotope Thermoelectric Generator MMS Magnetospheric...probes designed to explore the Martian surface, to satellites equipped with advanced sensors to study the earth , to telescopes intended to explore the

  13. Ecological Monitoring and Compliance Program 2006 Report

    Energy Technology Data Exchange (ETDEWEB)

    David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

    2007-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows

  14. Compliance status report for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-31

    The US Department of Energy (DOE) is responsible for the disposition of transuranic (TRU) waste generated through national defense-related activities. Approximately 53,700 m{sup 2} of these wastes have been generated and are currently stored at government defense installations across the country. The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been sited and constructed to meet the criteria established by the scientific and regulatory community for the safe, long-term disposal of TRU and TRU-mixed wastes. This Compliance Status Report (CSR) provides an assessment of the progress of the WIPP Program toward compliance with long-term disposal regulations, set forth in Title 40 CFR 191 (EPA, 1993a), Subparts B and C, and Title 40 CFR {section}268.6 (EPA, 1993b), in order to focus on-going and future experimental and engineering activities. The CSR attempts to identify issues associated with the performance of the WIPP as a long-term repository and to focus on the resolution of these issues. This report will serve as a tool to focus project resources on the areas necessary to ensure complete, accurate, and timely submittal of the compliance application. This document is not intended to constitute a statement of compliance or a demonstration of compliance.

  15. An investigation of the factors which influence and deter the compliance behaviour of Australian individual taxpayers

    OpenAIRE

    Devos, Ken Neil Harry

    2017-01-01

    The tax compliance literature indicates that many factors, including economic, social, psychological and demographic factors, have an impact on the compliance behaviour of taxpayers. Of the two main compliance theories, the economic deterrence theory model and social/fiscal psychology theory model, this study has adopted the latter. The aim of this study was to examine whether or not a relationship exists between selected tax compliance variables (both economic and non-economic) and the attit...

  16. The Amsterdam Hip Protector Study: Compliance and determinants of compliance

    NARCIS (Netherlands)

    van Schoor, N.M.; Asma, G.; Smit, J.H.; Bouter, L.M.; Lips, P.T.A.M.

    2003-01-01

    Hip protectors appear to be effective in reducing the incidence of hip fractures. However, compliance is often poor. Therefore, the objective of this study was to examine the compliance and determinants of compliance with external hip protectors. A prospective study was performed in residents from

  17. Space Telecommunications Radio System (STRS) Compliance Testing

    Science.gov (United States)

    Handler, Louis M.

    2011-01-01

    The Space Telecommunications Radio System (STRS) defines an open architecture for software defined radios. This document describes the testing methodology to aid in determining the degree of compliance to the STRS architecture. Non-compliances are reported to the software and hardware developers as well as the NASA project manager so that any non-compliances may be fixed or waivers issued. Since the software developers may be divided into those that provide the operating environment including the operating system and STRS infrastructure (OE) and those that supply the waveform applications, the tests are divided accordingly. The static tests are also divided by the availability of an automated tool that determines whether the source code and configuration files contain the appropriate items. Thus, there are six separate step-by-step test procedures described as well as the corresponding requirements that they test. The six types of STRS compliance tests are: STRS application automated testing, STRS infrastructure automated testing, STRS infrastructure testing by compiling WFCCN with the infrastructure, STRS configuration file testing, STRS application manual code testing, and STRS infrastructure manual code testing. Examples of the input and output of the scripts are shown in the appendices as well as more specific information about what to configure and test in WFCCN for non-compliance. In addition, each STRS requirement is listed and the type of testing briefly described. Attached is also a set of guidelines on what to look for in addition to the requirements to aid in the document review process.

  18. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  19. Mapping Tax Compliance

    DEFF Research Database (Denmark)

    Boll, Karen

    2014-01-01

    Tax compliance denotes the act of reporting and paying taxes in accordance with the tax laws. Current social science scholarship on tax compliance can almost entirely be divided into behavioural psychology analyses and critical tax studies. This article, which presents two cases of how tax...... compliance is constructed, challenges the explanatory reaches of today's social science approaches, arguing that an alternative approach to understanding tax compliance is worthwhile exploring. This other choice of approach, inspired by actor–network theory (ANT), adopts a more practice-oriented focus...... that studies tax compliance where it takes place as well as what it is made of. Consequently, this article argues that tax compliance is a socio-material assemblage and that complying is a distributed action. The article concludes by highlighting how an ANT approach contributes to the further theoretical...

  20. Normal compliance contact models with finite interpenetration

    Czech Academy of Sciences Publication Activity Database

    Eck, Ch.; Jarušek, Jiří; Stará, J.

    2013-01-01

    Roč. 208, č. 1 (2013), s. 25-57 ISSN 0003-9527 R&D Projects: GA AV ČR IAA100750802; GA ČR(CZ) GAP201/12/0671 Institutional support: RVO:67985840 Keywords : compliance models * approximation Subject RIV: BA - General Mathematics Impact factor: 2.022, year: 2013 http://link.springer.com/article/10.1007%2Fs00205-012-0602-8#

  1. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  2. Farmers' compliance with the use of approved cocoa pesticides in ...

    African Journals Online (AJOL)

    The survey evaluates the awareness and level of compliance in the use of approved cocoa pesticides by local farmers in selected cocoa producing states of Nigeria. Thirty farmers were randomly selected in Kwara, Ogun and Osun States. More than 70 percent of the farmers were aware of banned cocoa pesticides.

  3. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  4. Environmental Compliance Mechanisms

    NARCIS (Netherlands)

    Merkouris, Panagiotis; Fitzmaurice, Malgosia

    2017-01-01

    Compliance mechanisms can be found in treaties regulating such diverse issues as human rights, disarmament law, and environmental law. In this bibliography, the focus will be on compliance mechanisms of multilateral environmental agreements (MEAs). Compliance with norms of international

  5. COST OF TAX COMPLIANCE AND RISK MANAGEMENT IN PROJECTS: THE CASE STUDY OF A SMALL ENTERPRISE

    Directory of Open Access Journals (Sweden)

    Mario Manzini Cianfanelli

    2010-06-01

    Full Text Available This study uses a risk management perspective to analyze compliance costs arising from overlapping service tax (ST jurisdictions. We study the case of an engineering company providing services to the Companhia de Saneamento Básico do Estado de São Paulo [São Paulo State Sanitation Company] – SABESP, a public entity. The engineering company was contracted under public law 8.666/93, to provide engineering service in several townships in São Paulo’s metropolitan area. Because the laws governing bidding do not permit later modification in price or provider, subsequent double taxation by one municipality cut into the firm’s margins, and should other local governments follow suit, multiple taxation would render the contract untenable for the provider. Our paper models the impact of conflicting jurisdictions on administrative burden, psychological costs and profit constriction and discusses project management techniques for decision making and management in similar situations.

  6. Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2018-06-01

    Full Text Available The application of Public-Private Partners (PPPs in housing provisioning is on the increase across the world. However, there is a paucity of empirical studies on the specific factors considered at the initiation, and measures taken to ensure transparency at the procurement stages, of PPP housing projects. This study examined project selection factors and transparency measures in PPP housing projects using data sourced from oral interviews with 27 experts in nine PPP housing schemes in Nigeria. Results of the content analysis revealed that the top two selection factors considered by both the public and private sector operators of PPP housing projects in Nigeria are the availability of land and viability of the funding arrangements. Whereas the public-sector partners also consider the availability of competent private sector to deliver the projects, the private developers are concerned with the location of proposed projects. It was also found that the two key measures taken to ensure transparency at the procurement stage of the projects are transparent and competitive bidding and open advertisements of tender opportunities. These imply that before embarking on PPP housing projects, operators should ensure that there is available land in good locations, sound funding arrangements, and measures for achieving transparency in the schemes.

  7. Optimizing experimental parameters for the projection requirement in HAADF-STEM tomography

    International Nuclear Information System (INIS)

    Aveyard, R.; Zhong, Z.; Batenburg, K.J.; Rieger, B.

    2017-01-01

    Highlights: • The extent to which HAADF-STEM meets the projection requirement has been studied. • Multislice simulations used to model beam propagation and study signal linearity. • Propagation in crystalline and amorphous materials considered. • Optimal experimental set-up for the projection requirement is discussed. - Abstract: Tomographic reconstruction algorithms offer a means by which a tilt-series of transmission images can be combined to yield a three dimensional model of the specimen. Conventional reconstruction algorithms assume that the measured signal is a linear projection of some property, typically the density, of the material. Here we report the use of multislice simulations to investigate the extent to which this assumption is met in HAADF-STEM imaging. The use of simulations allows for a systematic survey of a range of materials and microscope parameters to inform optimal experimental design. Using this approach it is demonstrated that the imaging of amorphous materials is in good agreement with the projection assumption in most cases. Images of crystalline specimens taken along zone-axes are found to be poorly suited for conventional linear reconstruction algorithms due to channelling effects which produce enhanced intensities compared with off-axis images, and poor compliance with the projection requirement. Off-axis images are found to be suitable for reconstruction, though they do not strictly meet the linearity requirement in most cases. It is demonstrated that microscope parameters can be selected to yield improved compliance with the projection requirement.

  8. Optimizing experimental parameters for the projection requirement in HAADF-STEM tomography

    Energy Technology Data Exchange (ETDEWEB)

    Aveyard, R., E-mail: r.a.aveyard@tudelft.nl [Department of Imaging Physics, Delft University of Technology, 2628CJ Delft (Netherlands); Zhong, Z.; Batenburg, K.J. [Centrum Wiskunde and Informatica, Science Park 123, NL-1098 XG Amsterdam (Netherlands); Rieger, B., E-mail: b.rieger@tudelft.nl [Department of Imaging Physics, Delft University of Technology, 2628CJ Delft (Netherlands)

    2017-06-15

    Highlights: • The extent to which HAADF-STEM meets the projection requirement has been studied. • Multislice simulations used to model beam propagation and study signal linearity. • Propagation in crystalline and amorphous materials considered. • Optimal experimental set-up for the projection requirement is discussed. - Abstract: Tomographic reconstruction algorithms offer a means by which a tilt-series of transmission images can be combined to yield a three dimensional model of the specimen. Conventional reconstruction algorithms assume that the measured signal is a linear projection of some property, typically the density, of the material. Here we report the use of multislice simulations to investigate the extent to which this assumption is met in HAADF-STEM imaging. The use of simulations allows for a systematic survey of a range of materials and microscope parameters to inform optimal experimental design. Using this approach it is demonstrated that the imaging of amorphous materials is in good agreement with the projection assumption in most cases. Images of crystalline specimens taken along zone-axes are found to be poorly suited for conventional linear reconstruction algorithms due to channelling effects which produce enhanced intensities compared with off-axis images, and poor compliance with the projection requirement. Off-axis images are found to be suitable for reconstruction, though they do not strictly meet the linearity requirement in most cases. It is demonstrated that microscope parameters can be selected to yield improved compliance with the projection requirement.

  9. Ecological Monitoring and Compliance Program Fiscal Year 2002 Report (Part Two of Two)

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Wills

    2002-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species and important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species

  10. Selective serotonergic excitation of callosal projection neurons

    Directory of Open Access Journals (Sweden)

    Daniel eAvesar

    2012-03-01

    Full Text Available Serotonin (5-HT acting as a neurotransmitter in the cerebral cortex is critical for cognitive function, yet how 5-HT regulates information processing in cortical circuits is not well understood. We tested the serotonergic responsiveness of layer 5 pyramidal neurons (L5PNs of the mouse medial prefrontal cortex (mPFC, and found 3 distinct response types: long-lasting 5-HT1A (1A receptor-dependent inhibitory responses (84% of L5PNs, 5-HT2A (2A receptor-dependent excitatory responses (9%, and biphasic responses in which 2A-dependent excitation followed brief inhibition (5%. Relative to 5-HT-inhibited neurons, those excited by 5-HT had physiological properties characteristic of callosal/commissural (COM neurons that project to the contralateral cortex. We tested whether serotonergic responses in cortical pyramidal neurons are correlated with their axonal projection pattern using retrograde fluorescent labeling of COM and corticopontine-projecting (CPn neurons. 5-HT generated excitatory or biphasic responses in all 5-HT-responsive layer 5 COM neurons. Conversely, CPn neurons were universally inhibited by 5-HT. Serotonergic excitation of COM neurons was blocked by the 2A antagonist MDL 11939, while serotonergic inhibition of CPn neurons was blocked by the 1A antagonist WAY 100635, confirming a role for these two receptor subtypes in regulating pyramidal neuron activity. Selective serotonergic excitation of COM neurons was not layer-specific, as COM neurons in layer 2/3 were also selectively excited by 5-HT relative to their non-labeled pyramidal neuron neighbors. Because neocortical 2A receptors are implicated in the etiology and pathophysiology of schizophrenia, we propose that COM neurons may represent a novel cellular target for intervention in psychiatric disease.

  11. Interventions to promote psychiatric patients' compliance to mental ...

    African Journals Online (AJOL)

    Method: A systematic review was chosen as a design to identify primary studies that answered the following research question: What is the current evidence on interventions to promote psychiatric patients' compliance to mental health treatment? Selected electronic databases were thoroughly searched. Studies were ...

  12. Building Energy Efficiency in India: Compliance Evaluation of Energy Conservation Building Code

    Energy Technology Data Exchange (ETDEWEB)

    Yu, Sha; Evans, Meredydd; Delgado, Alison

    2014-03-26

    India is experiencing unprecedented construction boom. The country doubled its floorspace between 2001 and 2005 and is expected to add 35 billion m2 of new buildings by 2050. Buildings account for 35% of total final energy consumption in India today, and building energy use is growing at 8% annually. Studies have shown that carbon policies will have little effect on reducing building energy demand. Chaturvedi et al. predicted that, if there is no specific sectoral policies to curb building energy use, final energy demand of the Indian building sector will grow over five times by the end of this century, driven by rapid income and population growth. The growing energy demand in buildings is accompanied by a transition from traditional biomass to commercial fuels, particularly an increase in electricity use. This also leads to a rapid increase in carbon emissions and aggravates power shortage in India. Growth in building energy use poses challenges to the Indian government. To curb energy consumption in buildings, the Indian government issued the Energy Conservation Building Code (ECBC) in 2007, which applies to commercial buildings with a connected load of 100 kW or 120kVA. It is predicted that the implementation of ECBC can help save 25-40% of energy, compared to reference buildings without energy-efficiency measures. However, the impact of ECBC depends on the effectiveness of its enforcement and compliance. Currently, the majority of buildings in India are not ECBC-compliant. The United Nations Development Programme projected that code compliance in India would reach 35% by 2015 and 64% by 2017. Whether the projected targets can be achieved depends on how the code enforcement system is designed and implemented. Although the development of ECBC lies in the hands of the national government – the Bureau of Energy Efficiency under the Ministry of Power, the adoption and implementation of ECBC largely relies on state and local governments. Six years after ECBC

  13. SELECTION OF EFFECTIVE MODELS OF PROJECT IMPLEMENTATION IN A CHANGING FINANCIAL SITUATION

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2015-06-01

    Full Text Available The article describes the methods of selecting effective models of construction projects of residential buildings and recommendations for its use. The technique is based on the construction of the models in the program Microsoft Project and analysis using the program COMPEX. Methods can be used not only for building projects. It is especially effective in a variable financial situation.

  14. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  15. Traceability and retrievability: Documentation, the bridge from science to compliance

    International Nuclear Information System (INIS)

    Warner, P.J.

    1997-01-01

    In this day of regulatory compliance, the fact that good science was practiced and documented is, in and of itself, not enough to assure a successful licensing or permitting result. A new level of documentation, that clearly walks a non-project reviewer through the traceability of all activities and decisions is required for successful acceptance of scientific results. Compliance reviewers (whether the Nuclear Regulatory Commission (NRC), Environmental Protection Agency (EPA), etc.) expect to verify the results of the scientific and program activities without the physical presence of the person or persons that conducted the activity. Traceability of activities and associated decisions through the retrieval of all associated records is a must. This presentation is based on lessons learned from the various quality assurance (QA) audits and program reviews of Sandia National Laboratories, Nuclear Waste Management Programs Center, scientific and programmatic documentation. The authors build a bridge from science to compliance from lessons learned. Here now is a somewhat fictional rendition of actual scientific testing and compliance support activities

  16. ENHANCING VOLUNTARY COMPLIANCE BY REDUCING COMPLIANCE COSTS: A TAXPAYER SERVICE APPROACH

    OpenAIRE

    Glenn Jenkins; EDWIN FORLEMU

    1993-01-01

    In this paper an overview is made of the determinants of voluntary tax compliance. Unlike previous treatments of this subject, the cost of taxpayer compliance is considered as an important determinant of overall level of voluntary compliance in a country. A number of ways that tax authorities reduce compliance are discussed, and the most common uses of information technology in providing taxpayer service is described. Finally, the paper considers some of the ways that such activities might be...

  17. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    Energy Technology Data Exchange (ETDEWEB)

    Raff, D. [U.S. Dept. of the Interior, Bureau of Reclamation, Denver, Colorado (United States)

    2008-07-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  18. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    International Nuclear Information System (INIS)

    Raff, D.

    2008-01-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  19. Perspectives on compliance: non-compliance with environmental licenses in the Netherlands

    NARCIS (Netherlands)

    van Snellenberg, A.H.L.M.; van de Peppel, R.A.

    2002-01-01

    Compliance with environmental law is not self-evident. In many instances enforcement of environmental regulations is a necessary means for achieving compliance. Assuming that an enforcement strategy, in order to be effective, has to fit the type of non-compliance, we integrate six different

  20. Activity modes selection for project crashing through deterministic simulation

    Directory of Open Access Journals (Sweden)

    Ashok Mohanty

    2011-12-01

    Full Text Available Purpose: The time-cost trade-off problem addressed by CPM-based analytical approaches, assume unlimited resources and the existence of a continuous time-cost function. However, given the discrete nature of most resources, the activities can often be crashed only stepwise. Activity crashing for discrete time-cost function is also known as the activity modes selection problem in the project management. This problem is known to be NP-hard. Sophisticated optimization techniques such as Dynamic Programming, Integer Programming, Genetic Algorithm, Ant Colony Optimization have been used for finding efficient solution to activity modes selection problem. The paper presents a simple method that can provide efficient solution to activity modes selection problem for project crashing.Design/methodology/approach: Simulation based method implemented on electronic spreadsheet to determine activity modes for project crashing. The method is illustrated with the help of an example.Findings: The paper shows that a simple approach based on simple heuristic and deterministic simulation can give good result comparable to sophisticated optimization techniques.Research limitations/implications: The simulation based crashing method presented in this paper is developed to return satisfactory solutions but not necessarily an optimal solution.Practical implications: The use of spreadsheets for solving the Management Science and Operations Research problems make the techniques more accessible to practitioners. Spreadsheets provide a natural interface for model building, are easy to use in terms of inputs, solutions and report generation, and allow users to perform what-if analysis.Originality/value: The paper presents the application of simulation implemented on a spreadsheet to determine efficient solution to discrete time cost tradeoff problem.

  1. A Study to Determine the Correlation between Continuity of Care and Patient Medication Compliance

    Science.gov (United States)

    1984-08-01

    U (III FILE ’Y TO DETERMINE THE CORRELATION BETWEEN CONTINUITY OF CARE AND PATIENT MEDICATION COMPLIANCE IA Graduate Research Project Submitted to...43 APPENDIX A. PATIENT MEDICATION COMPLIANCE QUESTIONNAIRE . . . . . 45 B. COMPUTER CODED INPUT FORMAT . . . . . . . ...... 48 C. RESEARCH DATA...and that adhered to by the patient . This failure to comply with medical recommendations results in a waste of health resources, frustration to the

  2. A multifaceted hospital-wide intervention increases hand hygiene compliance.

    Science.gov (United States)

    Patel, B; Engelbrecht, H; McDonald, H; Morris, V; Smythe, W

    2016-03-07

    Hand hygiene is an important and basic practice that should be used by all healthcare staff to protect both themselves and their patients against infection. Unfortunately hand hygiene compliance remains poor. To show an improvement in hand hygiene compliance using a multifaceted approach. This was a quasiexperimental pre-post intervention study design with a number of standardised interventions to promote hand hygiene. The World Health Organization hand hygiene multimodal (five-step) intervention approach was used. The study ran from June 2015 to August 2015 in 11 selected wards of a 975-bed tertiary and quaternary care public hospital (Groote Schuur Hospital, Cape Town, South Africa). The outcome was to assess improvement in hand hygiene compliance monthly over the 3 months, compared with non-intervention wards and compared with the wards' own performance measured in 2014. The study included both descriptive and analytical components. Post intervention, hand hygiene compliance showed a statistically significant improvement for before patient contact from 34% in 2014 to 76% in 2015 (p<0.05) and for after patient contact from 47% in 2014 to 82% in 2015 (p<0.05). The intervention improved hand hygiene compliance and can easily be replicated in other wards, resulting in sustaining a culture of hand hygiene improvement and behavioural change throughout the hospital.

  3. Criminal Compliance

    Directory of Open Access Journals (Sweden)

    Cristina Antonella Andretta

    2015-10-01

    The article discusses the concepts of both compliance and criminal compliance, its main components and structure as well as the main rules relating to its global application, and finally his emergence in the Ecuadorian legal system.

  4. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  5. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  6. Regulatory compliance for a Yucca Mountain Repository: A performance assessment perspective

    International Nuclear Information System (INIS)

    Dyer, J.R.; Van Luik, A.E.; Gil, A.V.; Brocoum, S.J.

    1997-01-01

    The U.S. Department of Energy's Yucca Mountain Site Characterization Project is scheduled to submit a License Application in the year 2002. The License Application is to show compliance with the regulations promulgated by the U.S. Nuclear Regulatory Commission which implement standards promulgated by the U.S. Environmental Protection Agency. These standards are being revised, and it is not certain what their exact nature will be in term of either the performance measure(s) or the time frames that are to be addressed. This paper provides some insights pertaining to this regulatory history, an update on Yucca Mountain performance assessments, and a Yucca Mountain Site Characterization Project perspective on proper standards based on Project experience in performance assessment for its proposed Yucca Mountain Repository system. The Project's performance assessment based perspective on a proper standard applicable to Yucca Mountain may be summarized as follows: a proper standard should be straight forward and understandable; should be consistent with other standards and regulations; and should require a degree of proof that is scientifically supportable in a licensing setting. A proper standard should have several attributes: (1) propose a reasonable risk level as its basis, whatever the quantitative performance measure is chosen to be, (2) state a definite regulatory time frame for showing compliance with quantitative requirements, (3) explicitly recognize that the compliance calculations are not predictions of actual future risks, (4) define the biosphere to which risk needs to be calculated in such a way as to constrain potentially endless speculation about future societies and future human actions, and (5) have as its only quantitative requirement the risk limit (or surrogate performance measure keyed to risk) for the total system

  7. New Method of Selecting Efficient Project Portfolios in the Presence of Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Bogdan Rębiasz

    2016-01-01

    Full Text Available A new methods of selecting efficient project portfolios in the presence of hybrid uncertainty has been presented. Pareto optimal solutions have been defined by an algorithm for generating project portfolios. The method presented allows us to select efficient project portfolios taking into account statistical and economic dependencies between projects when some of the parameters used in the calculation of effectiveness can be expressed in the form of an interactive possibility distribution and some in the form of a probability distribution. The procedure for processing such hybrid data combines stochastic simulation with nonlinear programming. The interaction between data are modeled by correlation matrices and the interval regression. Economic dependences are taken into account by the equations balancing the production capacity of the company. The practical example presented indicates that an interaction between projects has a significant impact on the results of calculations. (original abstract

  8. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  9. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  10. Nurses' perceptions of reasons for persistent low rates in hand hygiene compliance.

    Science.gov (United States)

    Sadule-Rios, Nohemi; Aguilera, Graciela

    2017-10-01

    The purpose of this study was to explore nurses' perceptions of reasons for persistent low rates in hand hygiene compliance in the Critical Care Unit and their recommendations for improvement. This study used an exploratory, descriptive survey design to identify critical care nurses' perceptions of barriers to hand hygiene compliance in the unit and their recommendations for improvement. Nurses selected high workload, understaffing and suggested lack of time as the main problems with hand hygiene compliance in the critical care unit. Second to that, they identified difficulty accessing sinks and lack of appropriately located hand sanitisers at the point of care complemented by suggestions of not enough sinks and inconveniently located hand sanitiser as major barriers to hand hygiene compliance. Results of this study indicate that high workload and understaffing added to difficulty accessing hand hygiene resources contribute to low rates of hand hygiene compliance in the critical care unit. Addressing nursing understaffing and workload and making some environmental modifications to allow easy access to sinks and hand sanitisers may facilitate nurses hand hygiene compliance in this setting. Further studies on the relationship between nurses' workload, unit staffing, and hand hygiene compliance rates are needed. Copyright © 2017 Elsevier Ltd. All rights reserved.

  11. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    Science.gov (United States)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  12. Formalizing and appling compliance patterns for business process compliance

    NARCIS (Netherlands)

    Elgammal, A.; Turetken, O.; van den Heuvel, W.; Papazoglou, M.

    2016-01-01

    Today’s enterprises demand a high degree of compliance of business processes to meet diverse regulations and legislations. Several industrial studies have shown that compliance management is a daunting task, and organizations are still struggling and spending billions of dollars annually to ensure

  13. Formalizing and applying compliance patterns for business process compliance

    NARCIS (Netherlands)

    Elgammal, A.F.S.A.; Türetken, O.; van den Heuvel, W.J.A.M.; Papazoglou, M.

    Today’s enterprises demand a high degree of compliance of business processes to meet diverse regulations and legislations. Several industrial studies have shown that compliance management is a daunting task, and organizations are still struggling and spending billions of dollars annually to ensure

  14. Diagnostic information for compliance checking of temporal compliance requirements

    NARCIS (Netherlands)

    Ramezani Taghiabadi, E.; Fahland, D.; Dongen, van B.F.; Aalst, van der W.M.P.; Salinesi, C.; Norrie, M.C.; Pastor, O.

    2013-01-01

    Compliance checking is gaining importance as today’s organizations need to show that operational processes are executed in a controlled manner while satisfying predefined (legal) requirements or service level agreements. Deviations may be costly and expose an organization to severe risks. Compliance

  15. Notification: Audit of CSB's Compliance with the Cybersecurity Act of 2015

    Science.gov (United States)

    Project #OA-FY16-0127, March 14, 2016. The EPA OIG plans to begin fieldwork for an audit of the U.S. CSB's compliance with the mandated “Inspector General Report on Covered Systems,” as outlined in the Cybersecurity Act of 2015.

  16. 26 CFR 1.42-5 - Monitoring compliance with low-income housing credit requirements.

    Science.gov (United States)

    2010-04-01

    ... project, the 15-40 test under sections 42(g)(4) and 142 (d)(4)(B) for “deep rent skewed” projects; (ii... of Housing and Urban Development (HUD), 24 CFR 180.680, an adverse final decision by a substantially... in compliance at any time in the future, the Agency need not file Form 8823 in subsequent years to...

  17. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  18. 5 CFR 330.503 - Assessment of compliance with competitive principles.

    Science.gov (United States)

    2010-01-01

    ... principles. 330.503 Section 330.503 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS RECRUITMENT, SELECTION, AND PLACEMENT (GENERAL) Restrictions To Protect Competitive Principles § 330.503 Assessment of compliance with competitive principles. As one factor in assessing an agency's...

  19. A process for selection and training of super-users for ERP implementation projects

    DEFF Research Database (Denmark)

    Danielsen, Peter; Sandfeld Hansen, Kenneth; Helt, Mads

    2017-01-01

    The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super-users in......The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super...

  20. The role of personal opinions and experiences in compliance with mass drug administration for lymphatic filariasis elimination in Kenya.

    Science.gov (United States)

    Njomo, Doris W; Amuyunzu-Nyamongo, Mary; Magambo, Japheth K; Njenga, Sammy M

    2012-01-01

    The main strategy adopted for Lymphatic Filariasis (LF) elimination globally is annual mass drug administration (MDA) for 4 to 6 rounds. At least 65% of the population at risk should be treated in each round for LF elimination to occur. In Kenya, MDA using diethylcarbamazine citrate (DEC) and albendazole data shows declining compliance (proportion of eligible populations who receive and swallow the drugs) levels (85%-62.8%). The present study's aim was to determine the role of personal opinions and experiences in compliance with MDA. This was a retrospective cross-sectional study conducted between January and September 2009 in two districts based on December 2008 MDA round. In each district, one location with high and one with low compliance was selected. Through systematic sampling, nine villages were selected and interviewer-based questionnaires administered to 965 household heads or adult representatives also systematically sampled. The qualitative data were generated from opinion leaders, LF patients with clinical signs and community drug distributors (CDDs) all purposively selected and interviewed. Sixteen focus group discussions (FGDs) were also conducted with single-sex adult and youth male and female groups. Chi square test was used to assess the statistical significance of differences in compliance with treatment based on the records reviewed. The house-to-house method of drug distribution influenced compliance. Over one-quarter (27%) in low compared to 15% in high compliance villages disliked this method. Problems related to size, number and taste of the drugs were more common in low (16.4%) than in high (14.4%) compliance villages. Reasons for failure to take the drugs were associated with compliance (pcompliance villages. Experience of side effects influenced compliance (Pcompliance in both types of villages (p>0.05). Community sensitization on treatment, drugs used, their regimen and distribution method involving all leaders should be strengthened by

  1. On quantifying uncertainty for project selection: the case of renewable energy sources' investment

    International Nuclear Information System (INIS)

    Kirytopoulos, Konstantinos; Rentizelas, Athanassios; Tziralis, Georgios

    2006-01-01

    The selection of a project among different alternatives, considering the limited resources of a company (organisation), is an added value process that determines the prosperity of an undertaken project (investment). This applies also to the 'boming' Renewable Energy Sector, especially under the circumstances established by the recent activation of the Kyoto protocal and by the plethora of available choices for renewable energy sources (RES) projjects. The need for a reliable project selection method among the various alternatives is, therefore, highlighted and, in this context, the paper proposes the NPV function as one of possible criteria for the selection of a RES project. Furthermore, it differentiates from the typical NPV calculation process by adding the concept of a probabilistic NPV approach through Monte Carlo simulation. Reality is non-deterministic, so any attempt of modelling it by using a deterministic approach is by definition erroneous. The paper ultimately proposes a process of substituting the point with a range estimation, capable of quantifying the various uncertainty factors and in this way elucidate the accomplishment possibilities of eligible scenarious. The paper is enhanced by case study showing how the proposed method can be practically applied to support the investment decision, thus enabling the decision makers to judge its effectiveness and usefulness.(Author)

  2. An analysis of project selection and assignment criteria of danish tenders in europe

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    , and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period...

  3. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  4. The ENTRIA project. Selected disciplinary and interdisciplinary research topics

    International Nuclear Information System (INIS)

    Roehlig, Klaus-Juergen; Hocke, Peter; Walther, Clemens

    2015-01-01

    ENTRIA (''Disposal Options for Radioactive Residues: Interdisciplinary Analyses and Development of Evaluation Principles'', www.entria.de) is a joint research project carried out by twelve departments and institutes from German universities and major research institutions and one partner from Switzerland. It is financed by the German Ministry of Education and Research (BMBF). Scientists representing natural sciences, civil engineering, philosophy, law, social and political sciences, and technology assessment carry out disciplinary and interdisciplinary research addressing three options to manage especially high-level radioactive waste: - Final disposal in deep geological formations without any arrangements for retrieval, - disposal in deep geological formations with arrangements for monitoring and retrieval, and - (prolonged) surface (or near-surface) storage. In the paper, the following selected research topics - both disciplinary and interdisciplinary - are briefly introduced in order to provide an impression of the project scope: - Surface storage, - reference concepts for emplacement in deep geological formations with retrievability and monitoring, - radiation exposure and justification of measures, - interdisciplinary perspectives on dose limits, - comparative studies on nuclear waste governance, - nuclear waste governance in Switzerland, - public involvement and the German Site Selection Act, and - citizens' jury.

  5. Capping the Cost of Compliance with the Kyoto Protocol and Recycling Revenues into Land-Use Projects

    Directory of Open Access Journals (Sweden)

    Bernhard Schlamadinger

    2001-01-01

    Full Text Available There is the concern among some countries that compliance costs with commitments under the Kyoto Protocol may be unacceptably high. There is also the concern that technical difficulties with the inclusion of land use, land-use change, and forestry activities in non-Annex I countries might lead to an effective exclusion of such activities from consideration under the Protocol. This paper is proposing a mechanism that addresses both these concerns. In essence, it is suggested that parties should be able to purchase fixed-price offset certificates if they feel they cannot achieve compliance through other means alone, such as by improved energy efficiency, increased use of renewable energy, or use of the flexible mechanisms in the Kyoto Protocol. These offset certificates would act as a price cap for the cost of compliance for any party to the Protocol. Revenues from purchase of the offset certificates would be directed to forest-based activities in non-Annex I countries such as forest protection that may carry multiple benefits including enhancing net carbon sequestration.

  6. Capping the cost of compliance with the Kyoto Protocol and recycling revenues into land-use projects.

    Science.gov (United States)

    Schlamadinger, B; Obersteiner, M; Michaelowa, A; Grubb, M; Azar, C; Yamagata, Y; Goldberg, D; Read, P; Kirschbaum, M U; Fearnside, P M; Sugiyama, T; Rametsteiner, E; Böswald, K

    2001-07-14

    There is the concern among some countries that compliance costs with commitments under the Kyoto Protocol may be unacceptably high. There is also the concern that technical difficulties with the inclusion of land use, land-use change, and forestry activities in non-Annex I countries might lead to an effective exclusion of such activities from consideration under the Protocol. This paper is proposing a mechanism that addresses both these concerns. In essence, it is suggested that parties should be able to purchase fixed-price offset certificates if they feel they cannot achieve compliance through other means alone, such as by improved energy efficiency, increased use of renewable energy, or use of the flexible mechanisms in the Kyoto Protocol. These offset certificates would act as a price cap for the cost of compliance for any party to the Protocol. Revenues from purchase of the offset certificates would be directed to forest-based activities in non-Annex I countries such as forest protection that may carry multiple benefits including enhancing net carbon sequestration.

  7. Hybrid Multicriteria Group Decision Making Method for Information System Project Selection Based on Intuitionistic Fuzzy Theory

    Directory of Open Access Journals (Sweden)

    Jian Guo

    2013-01-01

    Full Text Available Information system (IS project selection is of critical importance to every organization in dynamic competing environment. The aim of this paper is to develop a hybrid multicriteria group decision making approach based on intuitionistic fuzzy theory for IS project selection. The decision makers’ assessment information can be expressed in the form of real numbers, interval-valued numbers, linguistic variables, and intuitionistic fuzzy numbers (IFNs. All these evaluation pieces of information can be transformed to the form of IFNs. Intuitionistic fuzzy weighted averaging (IFWA operator is utilized to aggregate individual opinions of decision makers into a group opinion. Intuitionistic fuzzy entropy is used to obtain the entropy weights of the criteria. TOPSIS method combined with intuitionistic fuzzy set is proposed to select appropriate IS project in group decision making environment. Finally, a numerical example for information system projects selection is given to illustrate application of hybrid multi-criteria group decision making (MCGDM method based on intuitionistic fuzzy theory and TOPSIS method.

  8. Patient compliance and supportive periodontal therapy: Study among young adults of Namakkal district

    Directory of Open Access Journals (Sweden)

    Subramanium Gokulanathan

    2014-01-01

    Full Text Available Aims: The aim of this study is to assess the patient compliance to supportive and maintenance periodontal therapy and to determine the reason for noncompliance among young adult patients of Namakkal district, India. Materials and Methods: This was a cross-sectional study conducted on 400 patients who underwent periodontal therapy and subsequently recalled for supportive and maintenance periodontal treatment in the Department of Periodontics, Vivekanandha Dental College for Women, Namakkal. Patients age group 25-35 years and of both gender were equally selected and grouped by occupation and socioeconomic status. According to their compliance with appointments, they are categorized as complete compliance, partially compliance and insufficient or noncompliance. Noncompliance and partially compliance patients were contacted and asked to rate their experience and reason for noncompliance. Results: In this study, 80% of patients showed complete compliance and were regular for supportive periodontal therapy appointments. Women were more regular in maintaining recall appointments than men. Salaried employers showed 84.3% complete compliance, while self-employed personals showed 77% complete compliance and 75% of nonworking personals were regular to the appointment schedule. Noncompliance person has quoted lack of time and forgetting the appointment date as a major reason for missed appointments. Conclusions: This study recommends the need for improvement in communication skills of practitioners and weekend appointment for patient undergoing periodontal maintenance therapy.

  9. Compliance checking of data-aware and resource-aware compliance requirements

    NARCIS (Netherlands)

    Ramezani Taghiabadi, E.; Gromov, V.; Fahland, D.; Aalst, van der W.M.P.; Meersman, R.; Panetto, H.; Dillon, T.; Missikoff, M.; Liu, L.; Pastor, O.; Cuzzocrea, A.; Sllis, T.

    2014-01-01

    Compliance checking is gaining importance as today’s organizations need to show that their business practices are in accordance with predefined (legal) requirements. Current compliance checking techniques are mostly focused on checking the control-flow perspective of business processes. This paper

  10. Compliance status

    International Nuclear Information System (INIS)

    Black, D.G.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the activities conducted to ensure that the Hanford Site is in compliance with federal environmental protection statutes and related Washington State and local environmental protection regulations and the status of Hanford's compliance with these requirements. Environmental permits required under the environmental protection regulations are discussed under the applicable statute

  11. US Department of Energy Uranium Mill Tailings Remedial Action ground water Project

    International Nuclear Information System (INIS)

    1993-01-01

    The scope of the Project is to develop and implement a ground water compliance strategy for all 24 UMTRA processing sites. The compliance strategy for the processing sites must satisfy requirements of the proposed EPA ground water cleanup standards in 40 CFR Part 192, Subparts B and C (1988). This scope of work will entail the following activities, on a site-specific basis: Development of a compliance strategy based upon modification of the UMTRA Surface Project remedial action plans (RAP) or development of Ground Water Project RAPs with NRC and state or tribal concurrence on the RAP; implementation of the RAP to include establishment of institutional controls, where appropriate; institution of long-term verification monitoring for transfer to a separate DOE program on or before the Project end date; and preparation of completion reports and final licensing on those sites that will be completed prior to the Project end date

  12. CDM sustainable development impacts developed for the UNEP project 'CD4CDM'

    Energy Technology Data Exchange (ETDEWEB)

    Olhoff, Anne; Markandya, Anil; Halsnaes, Kirsten; Taylor, Tim

    2004-07-01

    The Clean Development Mechanism (CDM), an innovative cooperative mechanism under the Kyoto Protocol, is designed with the dual aim of assisting developing countries in achieving sustainable development (SD) and of assisting industrialised countries in achieving compliance with their greenhouse gas (GHG) emission reduction commitments. The SD dimension is not merely a requirement of the CDM; it should be seen as a main driver for developing country interest in participating in CDM projects. This is so, since apart from GHG emission reductions CDM projects will have a number of impacts in the host countries, including impacts on economic and social development and on the local environment. Furthermore, the selecting of the SD criteria and the assessment of the SD impacts are sovereign matters of the host countries in the current operationalisation of the Kyoto Protocol. National authorities can thus use the SD dimension to evaluate key linkages between national development goals and CDM projects, with the aim of selecting and designing CDM projects so that they create and maximise synergies with local development goals. (au)

  13. Revenue-Maximizing Radio Access Technology Selection with Net Neutrality Compliance in Heterogeneous Wireless Networks

    Directory of Open Access Journals (Sweden)

    Elissar Khloussy

    2018-01-01

    Full Text Available The net neutrality principle states that users should have equal access to all Internet content and that Internet Service Providers (ISPs should not practice differentiated treatment on any of the Internet traffic. While net neutrality aims to restrain any kind of discrimination, it also grants exemption to a certain category of traffic known as specialized services (SS, by allowing the ISP to dedicate part of the resources for the latter. In this work, we consider a heterogeneous LTE/WiFi wireless network and we investigate revenue-maximizing Radio Access Technology (RAT selection strategies that are net neutrality-compliant, with exemption granted to SS traffic. Our objective is to find out how the bandwidth reservation for SS traffic would be made in a way that allows maximizing the revenue while being in compliance with net neutrality and how the choice of the ratio of reserved bandwidth would affect the revenue. The results show that reserving bandwidth for SS traffic in one RAT (LTE can achieve higher revenue. On the other hand, when the capacity is reserved across both LTE and WiFi, higher social benefit in terms of number of admitted users can be realized, as well as lower blocking probability for the Internet access traffic.

  14. Generation IV and transmutation materials (GETMAT) project: First assessment of selected results

    International Nuclear Information System (INIS)

    Fazio, Concetta; Serrano, Marta; Gessi, Alessandro; Henry, Jean; Malerba, Lorenzo

    2015-01-01

    The Generation IV and Transmutation Material (GETMAT) project has been initiated within the 7. EURATOM framework programme with the objective to support the development of innovative reactor designs. Emphasis has been put on the investigation, both in the theoretical and experimental domains, of selected material properties that are cross-cutting among the various Generation IV and Transmutation systems. The selection of the properties to be investigated has been performed by identifying relevant conditions of key components as cores and primary systems. Moreover, taking into account the envisaged conditions of these components it turned out that innovative materials might be a better choice with respect to conventional nuclear grade steels. Therefore, ODS alloys and 9-12 Cr Ferritic/Martensitic (F/M) steels have been selected as reference for the GETMAT project. The R and D activities have been focused on basic characterisation of ODS alloys produced ad hoc for the project and on an extensive PIE programme of F/M steels irradiated in previous programmes. Finally, first principle modelling studies to explain irradiation hardening and embrittlement of F/M alloys were an additional important task. The objective of this manuscript is to make a first assessment of the results obtained within GETMAT. (authors)

  15. Selecting Health Care Improvement Projects: A Methodology Integrating Cause-and-Effect Diagram and Analytical Hierarchy Process.

    Science.gov (United States)

    Testik, Özlem Müge; Shaygan, Amir; Dasdemir, Erdi; Soydan, Guray

    It is often vital to identify, prioritize, and select quality improvement projects in a hospital. Yet, a methodology, which utilizes experts' opinions with different points of view, is needed for better decision making. The proposed methodology utilizes the cause-and-effect diagram to identify improvement projects and construct a project hierarchy for a problem. The right improvement projects are then prioritized and selected using a weighting scheme of analytical hierarchy process by aggregating experts' opinions. An approach for collecting data from experts and a graphical display for summarizing the obtained information are also provided. The methodology is implemented for improving a hospital appointment system. The top-ranked 2 major project categories for improvements were identified to be system- and accessibility-related causes (45%) and capacity-related causes (28%), respectively. For each of the major project category, subprojects were then ranked for selecting the improvement needs. The methodology is useful in cases where an aggregate decision based on experts' opinions is expected. Some suggestions for practical implementations are provided.

  16. Selection of Investment Projects by Monte Carlo Method in Risk Condition

    Directory of Open Access Journals (Sweden)

    M. E.

    2017-12-01

    Full Text Available The Monte Carlo method (also known as the Monte Carlo simulation was proposed by Nicholas Metropolis, S. Ulam and Jhon Von Neiman in 50-th years of the past century. The method can be widely applied to analysis of investment projects due to the advantages recognized both by practitioners and the academic community. The balance model of a project with discounted financial flows has been implemented for Microsoft Excel and Google Docs spread-sheet solutions. The Monte Carlo method for project with low and high correlated net present value (NPV parameters in the environment of the electronic tables of MS Excel/Google Docs. A distinct graduation of risk was identified. A necessity of account of correlation effects and the use of multivariate imitation during the project selection has been demonstrated.

  17. Compliance status

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.G.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the activities conducted to ensure that the Hanford Site is in compliance with federal environmental protection statutes and related Washington State and local environmental protection regulations and the status of Hanford`s compliance with these requirements. Environmental permits required under the environmental protection regulations are discussed under the applicable statute.

  18. Performing compliance

    DEFF Research Database (Denmark)

    Wimmelmann, Camilla Lawaetz

    2017-01-01

    the local policy workers front-staged some practices in the implementation process and back-staged others. The local policy workers deliberately performed ‘guideline compliance’ by using information control and impression management techniques. The findings suggest that local guideline compliance should...... be regarded as a staged performance in which deliberate techniques are used to produce and manage certain impressions of compliance....

  19. A quality improvement project to improve the Medicare and Medicaid Services (CMS) sepsis bundle compliance rate in a large healthcare system.

    Science.gov (United States)

    Raschke, Robert A; Groves, Robert H; Khurana, Hargobind S; Nikhanj, Nidhi; Utter, Ethel; Hartling, Didi; Stoffer, Brenda; Nunn, Kristina; Tryon, Shona; Bruner, Michelle; Calleja, Maria; Curry, Steven C

    2017-01-01

    Sepsis is a leading cause of mortality and morbidity in hospitalised patients. The Centers for Medicare and Medicaid Services (CMS) mandated that US hospitals report sepsis bundle compliance rate as a quality process measure in October 2015. The specific aim of our study was to improve the CMS sepsis bundle compliance rate from 30% to 40% across 20 acute care hospitals in our healthcare system within 1 year. The study included all adult inpatients with sepsis sampled according to CMS specifications from October 2015 to September 2016. The CMS sepsis bundle compliance rate was tracked monthly using statistical process control charting. A baseline rate of 28.5% with 99% control limits was established. We implemented multiple interventions including computerised decision support systems (CDSSs) to increase compliance with the most commonly missing bundle elements. Compliance reached 42% (99% statistical process control limits 18.4%-38.6%) as CDSS was implemented system-wide, but this improvement was not sustained after CMS changed specifications of the outcome measure. Difficulties encountered elucidate shortcomings of our study methodology and of the CMS sepsis bundle compliance rate as a quality process measure.

  20. Short- and long-term effects of clinical audits on compliance with procedures in CT scanning.

    Science.gov (United States)

    Oliveri, Antonio; Howarth, Nigel; Gevenois, Pierre Alain; Tack, Denis

    2016-08-01

    To test the hypothesis that quality clinical audits improve compliance with the procedures in computed tomography (CT) scanning. This retrospective study was conducted in two hospitals, based on 6950 examinations and four procedures, focusing on the acquisition length in lumbar spine CT, the default tube current applied in abdominal un-enhanced CT, the tube potential selection for portal phase abdominal CT and the use of a specific "paediatric brain CT" procedure. The first clinical audit reported compliance with these procedures. After presenting the results to the stakeholders, a second audit was conducted to measure the impact of this information on compliance and was repeated the next year. Comparisons of proportions were performed using the Chi-square Pearson test. Depending on the procedure, the compliance rate ranged from 27 to 88 % during the first audit. After presentation of the audit results to the stakeholders, the compliance rate ranged from 68 to 93 % and was significantly improved for all procedures (P ranging from audit (P ranging from 0.114 to 0.999). Quality improvement through repeated compliance audits with CT procedures durably improves this compliance. • Compliance with CT procedures is operator-dependent and not perfect. • Compliance differs between procedures and hospitals, even within a unified department. • Compliance is improved through audits followed by communication to the stakeholders. • This improvement is sustainable over a one-year period.

  1. Completion of Belene Nuclear Power Plant: Project perspectives

    International Nuclear Information System (INIS)

    Bogdanov, D.

    2006-01-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  2. Completion of Belene Nuclear Power Plant: Project perspectives

    Energy Technology Data Exchange (ETDEWEB)

    Bogdanov, D. [Risk Engineering Ltd., CREFID, 34 Totleben Blvd., Sofia 1606 (Bulgaria)]. E-mail: bogdanov@riskeng.bg

    2006-07-01

    The development of Belene NPP began with site selection in the 1970s, site characterisation in 1980-1981, and a decision to proceed in 1981. Construction was suspended for financial reasons in 1991. Now the state authorities have taken steps to continue the project. Despite the lengthy study period and the subsequent legislative changes, the evaluations indicate that Belene is a suitable NPP site. Studies of the Belene site have been completed and the conclusion is that the site is suitable and eligible for licensing for the construction of a NPP. In order to estimate the different options for completion of the project, different aspects of the plant were estimated. The information for different reactors was analysed, and quantitative assessment was performed by ranking the proposed facilities in different aspects of rated power, technology, safety, operation, licenseability (compliance to local regulations), etc. (author)

  3. A Framework for Six Sigma Project Selection in Higher Educational Institutions, Using a Weighted Scorecard Approach

    Science.gov (United States)

    Holmes, Monica C.; Jenicke, Lawrence O.; Hempel, Jessica L.

    2015-01-01

    Purpose: This paper discusses the importance of the Six Sigma selection process, describes a Six Sigma project in a higher educational institution and presents a weighted scorecard approach for project selection. Design/Methodology/Approach: A case study of the Six Sigma approach being used to improve student support at a university computer help…

  4. A CONCEPTUAL MODEL FOR IMPROVED PROJECT SELECTION AND PRIORITISATION

    Directory of Open Access Journals (Sweden)

    P. J. Viljoen

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Project portfolio management processes are often designed and operated as a series of stages (or project phases and gates. However, the flow of such a process is often slow, characterised by queues waiting for a gate decision and by repeated work from previous stages waiting for additional information or for re-processing. In this paper the authors propose a conceptual model that applies supply chain and constraint management principles to the project portfolio management process. An advantage of the proposed model is that it provides the ability to select and prioritise projects without undue changes to project schedules. This should result in faster flow through the system.

    AFRIKAANSE OPSOMMING: Prosesse om portefeuljes van projekte te bestuur word normaalweg ontwerp en bedryf as ’n reeks fases en hekke. Die vloei deur so ’n proses is dikwels stadig en word gekenmerk deur toue wat wag vir besluite by die hekke en ook deur herwerk van vorige fases wat wag vir verdere inligting of vir herprosessering. In hierdie artikel word ‘n konseptuele model voorgestel. Die model berus op die beginsels van voorsieningskettings sowel as van beperkingsbestuur, en bied die voordeel dat projekte geselekteer en geprioritiseer kan word sonder onnodige veranderinge aan projekskedules. Dit behoort te lei tot versnelde vloei deur die stelsel.

  5. Application of Systems Engineering to U.S. Department of Energy Privatization Project Selection at the Hanford Nuclear Reservation

    International Nuclear Information System (INIS)

    Layman, John Scott

    1999-01-01

    The privatization efforts at the U.S. Department of Energy's Hanford Nuclear Reservation have been very successful primarily due to a disciplined process for project selection and execution. Early in the development of Privatization at Hanford, the Department of Energy determined that a disciplined alternatives generation and analysis (AGA) process would furnish the candidate projects with the best probability for success. Many factors had to be considered in the selection of projects. Westinghouse Hanford Company was assigned to develop this process and facilitate the selection of the first round of candidate privatization projects. Team members for the AGA process were assembled from all concerned organizations and skill groups. Among the selection criteria were legal, financial and technical considerations which had to be weighed

  6. The role of personal opinions and experiences in compliance with mass drug administration for lymphatic filariasis elimination in Kenya.

    Directory of Open Access Journals (Sweden)

    Doris W Njomo

    Full Text Available The main strategy adopted for Lymphatic Filariasis (LF elimination globally is annual mass drug administration (MDA for 4 to 6 rounds. At least 65% of the population at risk should be treated in each round for LF elimination to occur. In Kenya, MDA using diethylcarbamazine citrate (DEC and albendazole data shows declining compliance (proportion of eligible populations who receive and swallow the drugs levels (85%-62.8%. The present study's aim was to determine the role of personal opinions and experiences in compliance with MDA.This was a retrospective cross-sectional study conducted between January and September 2009 in two districts based on December 2008 MDA round. In each district, one location with high and one with low compliance was selected. Through systematic sampling, nine villages were selected and interviewer-based questionnaires administered to 965 household heads or adult representatives also systematically sampled. The qualitative data were generated from opinion leaders, LF patients with clinical signs and community drug distributors (CDDs all purposively selected and interviewed. Sixteen focus group discussions (FGDs were also conducted with single-sex adult and youth male and female groups. Chi square test was used to assess the statistical significance of differences in compliance with treatment based on the records reviewed. The house-to-house method of drug distribution influenced compliance. Over one-quarter (27% in low compared to 15% in high compliance villages disliked this method. Problems related to size, number and taste of the drugs were more common in low (16.4% than in high (14.4% compliance villages. Reasons for failure to take the drugs were associated with compliance (p0.05.Community sensitization on treatment, drugs used, their regimen and distribution method involving all leaders should be strengthened by the Programme Implementers. The communities need to be made aware of the potential side effects of the

  7. Compliance of agrochemical marketers with banned cocoa pesticides in southwest Nigeria

    OpenAIRE

    Mokwunye Idongesit U.; Babalola Folaranmi D.; Asogwa Uche E.; Idris Ndagi; Aderolu Ismail A.; Mokwunye Francis C.; Idrisu Mohammed

    2014-01-01

    This study investigated the compliance of marketers of agrochemicals with the approved and banned cocoa pesticides in selected cocoa producing states of southwest Nigeria. Primary data was collected through the use of structured questionnaire administered to randomly selected agrochemical marketers. All the marketers (100%) were aware of the recently banned cocoa pesticides, however, majority still have the pesticides in stock. About 70.6% of the marketers ...

  8. Barriers to compliance with evidence-based care in trauma.

    Science.gov (United States)

    Rayan, Nadine; Barnes, Sunni; Fleming, Neil; Kudyakov, Rustam; Ballard, David; Gentilello, Larry M; Shafi, Shahid

    2012-03-01

    We have preciously demonstrated that trauma patients receive less than two-thirds of the care recommended by evidence-based medicine. The purpose of this study was to identify patients least likely to receive optimal care. Records of a random sample of 774 patients admitted to a Level I trauma center (2006-2008) with moderate to severe injuries (Abbreviated Injury Scale score ≥3) were reviewed for compliance with 25 trauma-specific processes of care (T-POC) endorsed by Advanced Trauma Life Support, Eastern Association for the Surgery of Trauma, the Brain Trauma Foundation, Surgical Care Improvement Project, and the Glue Grant Consortium based on evidence or consensus. These encompassed all aspects of trauma care, including initial evaluation, resuscitation, operative care, critical care, rehabilitation, and injury prevention. Multivariate logistic regression was used to identify patients likely to receive recommended care. Study patients were eligible for a total of 2,603 T-POC, of which only 1,515 (58%) were provided to the patient. Compliance was highest for T-POC involving resuscitation (83%) and was lowest for neurosurgical interventions (17%). Increasing severity of head injuries was associated with lower compliance, while intensive care unit stay was associated with higher compliance. There was no relationship between compliance and patient demographics, socioeconomic status, overall injury severity, or daily volume of trauma admissions. Little over half of recommended care was delivered to trauma patients with moderate to severe injuries. Patients with increasing severity of traumatic brain injuries were least likely to receive optimal care. However, differences among patient subgroups are small in relation to the overall gap between observed and recommended care. II.

  9. The role of the compliance officer – a comparison of US, UK and German law and practice.

    OpenAIRE

    Kanzenbach, Katrin

    2017-01-01

    The thesis introduces the role of the corporate compliance officer under US, UK and German law and practice. The aim of the thesis is to analyze the compliance function within private sector companies in the three selected jurisdictions in order to establish a model of the German compliance officer. My research is intended to bridge the gap in knowledge concerning the applicable legal standards required to ensure the effectiveness of this position. There is a lack of uniformity and standardiz...

  10. FDA (Food and Drug Administration) Compliance Program Guidance Manual (FY 88). Section 4. Medical and radiological devices

    International Nuclear Information System (INIS)

    1988-01-01

    The FDA Compliance Program Guidance Manual provides a system for issuing and filing program plans and instructions directed to Food and Drug Administration Field operations for project implementation. Section IV provides those chapters of the Compliance Program Guidance Manual which pertain to the areas of medical and radiological devices. Some of the areas of coverage include laser and sunlamp standards inspections, compliance testing of various radiation-emitting products such as television receivers and microwave ovens, emergency response planning and policy, premarket approval and device manufacturers inspections, device problem reporting, sterilization of devices, and consumer education programs on medical and radiological devices

  11. Ecological Monitoring and Compliance Program Fiscal Year 2000 Report

    Energy Technology Data Exchange (ETDEWEB)

    Wills, C.A.

    2000-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, Nevada Operations Office, monitors the ecosystem of he Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2000. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance,(3) ecosystem mapping, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 24 NTS projects. Seventeen sites were in desert tortoise habitat, and six acres of tortoise habitat were documented as being disturbed this year. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed. A topical report describing the classification of habitat types o n the NTS was completed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. A long-term monitoring plan for important plant species that occur on the NTS was completed. Sitewide inventories were conducted for the western burrowing owl, bat species of concern, wild horses, raptor nests, and mule deer. Fifty-nine of 69 known owl burrows were monitored. Forty-four of the known burrows are in disturbed habitat. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid-March to early April. A total of 45 juvenile owls was detected from eight breeding pairs. One nest burrow was detected in the Mojave Desert,one in the Great Basin Desert, and six in the Transition

  12. Cognitive defenses and compliance with radiation treatment in cancer patients

    International Nuclear Information System (INIS)

    Karassik, B.M.

    1989-01-01

    The present study was undertaken to investigate the relationships between four cognitive defenses and compliance with radiation therapy in cancer patients. The role of accurate self-report of usage of each of the defenses was examined as well. A distinction between direct-action and emotion-focused coping was utilized to conceptualize the possible relationships between compliance and the defenses. Based on the proposals of Heilbrun and Renert (1986) regarding the relative evasiveness of the defenses and available evidence from the compliance literature, it was predicted that noncompliant patients would show more repression, projection, and denial and less rationalization than compliant patients. In addition, based upon the findings of Heilbrun and Pepe (1985) that related self-deception to effectiveness of the defenses in dealing with stress, predictions were also made regarding differences in accuracy of reported defense usage by compliant and noncompliant patients. Noncompliant repressors and projectors and compliant rationalizers were predicted to be less aware of their respective use of these defenses than their compliant counterparts; noncompliant deniers were predicted to be more aware of the use of this defense than compliant deniers

  13. WIPP Regulatory Compliance Strategy and Management Plan for demonstrating compliance to long-term disposal standards

    International Nuclear Information System (INIS)

    1994-05-01

    The primary purpose of this document is to provide a strategy by which the WIPP will demonstrate its ability to perform as a deep geologic repository. The document communicates the DOE's understanding of the regulations related to long-term repository performance; and provides the most efficient strategy that intergrates WIPP Project elements, ensures the sufficiency of information, and provides flexibility for changes in the TRU waste generation system to facilitate the disposal of defense-generated TRU wastes. In addition, this document forms a focal point between the DOE and its various external regulators as well as other stakeholders for the purpose of arriving at compliance decisions that consider all relevant input

  14. Choices that increase compliance

    International Nuclear Information System (INIS)

    Edwards, P.R.

    1991-01-01

    A compliance model is developed and tested using a survey of corporate officials and the regulatory arena of equal employment opportunity. Findings support the economic model of compliance in its conclusion that probability of detection and probable level of sanctions influence compliance decisions. Results also indicate that adjustments to the model that account for bounded rationality are valid. The key outcome, however, is that although all types of investigations play some role in enhancing compliance, those that stress sanctions and thus severity rather than certainty of detection may have the greatest positive influence on compliance. Enforcement programs attempting to operate simply as investigators of small-scale complaints will have less success than those with different types of investigations or a balanced type of single investigation. The results also suggest a more complex cognitive process on the part of regulated individuals than initially theorized. 34 refs., 3 tabs

  15. Peer Assessment and Compliance Review (PACR) Innovative Strategies Report. California Court Appointed Special Advocates (CASA) Programs

    Science.gov (United States)

    Macro, Bronwen; Huang, Lee Ann

    2005-01-01

    This report focuses on the innovative strategies study component of the Peer Assessment and Compliance Review (PACR) project. California (Court Appointed Special Advocates) CASA programs have developed many innovative strategies to serve children in their communities. At each of the programs visited during the PACR project, the team identified at…

  16. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  17. SELECTION OF PROJECT MANAGERS IN CONSTRUCTION FIRMS USING ANALYTIC HIERARCHY PROCESS (AHP AND FUZZY TOPSIS: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Fatemeh Torfi

    2011-10-01

    Full Text Available Selecting a project manager is a major decision for every construction company. Traditionally, a project manager is selected by interviewing applicants and evaluating their capabilities by considering the special requirements of the project. The interviews are usually conducted by senior managers, and the selection of the best candidate depends on their opinions. Thus, the results may not be completely reliable. Moreover, conducting interviews for a large group of candidates is time-consuming. Thus, there is a need for computational models that can be used to select the most suitable applicant, given the project specifications and the applicants’ details. In this paper, a case study is performed in which a Fuzzy Multiple Criteria Decision Making (FMCDM model is used to select the best candidate for the post of project manager in a large construction firm. First, with the opinions of the senior managers, all the criteria and sub-criteria required for the selection are gathered, and the criteria priorities are qualitatively specified. Then, the applicants are ranked using the Analytic Hierarchy Process (AHP, approximate weights of the criteria, and fuzzy technique for order performance by similarity to ideal solution (TOPSIS. The results of the case study are shown to be satisfactory.

  18. Use of acceptable knowledge to demonstrate TRAMPAC compliance

    International Nuclear Information System (INIS)

    Whitworth, Julia; Becker, Blair; Guerin, David; Shokes, Tamara

    2004-01-01

    Recently, Los Alamos National Laboratory-Carlsbad Operations (LANL-CO) has supported the Central Characterization Project (CCP) managed by the U.S. Department of Energy (DOE) in the shipment of transuranic (TRU) waste from various small-quantity TRU waste generators to hub sites or other DOE sites in TRUPACT-II shipping containers. This support has involved using acceptable knowledge (AK) to demonstrate compliance with various requirements of Revision 19 of the TRUPACT-II Authorized Methods of Payload Compliance (TRAMPAC). LANL-CO has worked to facilitate TRUPACT-II shipments from the University of Missouri Research Reactor (MURR) and Lovelace Respiratory Research Institute (LRRI) to Argonne National Laboratory-East (ANL-E) and Los Alamos National Laboratory (LANL), respectively. The latter two sites have TRU waste certification programs approved to ship waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In each case, AK was used to satisfy the necessary information to ship the waste to other DOE facilities. For the purposes of intersite shipment, AK provided data to WIPP Waste Information System (WWIS) transportation modules to ensure that required information was obtained prior to TRUPACT-II shipments. The WWIS modules were used for the intersite shipments, not to enter certification data into WWIS, but rather to take advantage of a validated system to ensure that the containers to be shipped were compliant with TRAMPAC requirements, particularly in the evaluation of quantitative criteria. LANL-CO also assisted with a TRAMPAC compliance demonstration for homogeneous waste containers shipped in TRUPACT-II containers from ANL-E to Idaho National Engineering and Environmental Laboratory (INEEL) for the purpose of core sampling. The basis for the TRAMPAC compliance determinations was AK regarding radiological composition, chemical composition, TRU waste container packaging, and absence of prohibited items. Also, even in the case where AK is not used to

  19. 7 CFR 1486.506 - When will a project be reviewed?

    Science.gov (United States)

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false When will a project be reviewed? 1486.506 Section... Reporting, Evaluation, and Compliance § 1486.506 When will a project be reviewed? Any project or activity... after the completion of the project. ...

  20. The Canadian Nuclear Safety Commission Compliance Program for Uranium Mines and Mills

    Energy Technology Data Exchange (ETDEWEB)

    Schryer, D., E-mail: denis.schryer@cnsc-ccsn.gc.ca [Canadian Nuclear Safety Commission, Saskatoon, Saskatchewan (Canada)

    2014-05-15

    The Canadian Nuclear Safety Commission (CNSC) is the principal nuclear regulator in Canada. The CNSC is empowered through the Nuclear Safety and Control Act (NSCA) and its associated regulations, to regulate the entire nuclear cycle which includes: uranium mining and milling, uranium refining and processing, fuel fabrication, power generation and nuclear waste management. A CNSC uranium mine licence is required by a proponent to site, prepare, construct, operate, decommission and abandon this nuclear facility. The CNSC licence is the legal instrument that authorizes the regulated activities and incorporates conditions and regulatory controls. Following a favourable Commission Tribunal decision to issue a licence to authorize the licensed activities, CNSC develops and executes a compliance plan of the licensee’s programs and procedures. The CNSC compliance plan is risk-informed and applies its resources to the identified higher risk areas. The compliance program is designed to encourage compliance by integrating three components: promotion, verification and enforcement and articulates the CNSC expectations to attain and maintain compliance with its regulatory requirements. The licensee performance is assessed through compliance activities and reported to the Commission to inform the licensing process during licence renewal. The application of the ongoing compliance assessment and risk management model ensures that deviations from impact predictions are addressed in a timely manner. The Uranium Mines and Mills Division of the CNSC are preparing to meet the challenges of the planned expansion of their Canadian uranium mining industry. The presentation will discuss these challenges and the measures required to address them. The Uranium Mines and Mills Division (UMMD) have adopted a structured compliance framework which includes formal procedures to conduct site inspections. New UMMD staff are trained to apply the regulations to licensed sites and to manage non-compliance

  1. 76 FR 15961 - Funding Priorities and Selection Criterion; Disability and Rehabilitation Research Projects and...

    Science.gov (United States)

    2011-03-22

    ... priorities and a selection criterion for the Disability and Rehabilitation Research Projects and Centers... outcomes for underserved populations; (4) identify research gaps; (5) identify mechanisms of integrating research and practice; and (6) disseminate findings. This notice proposes two priorities and a selection...

  2. Network Insights for Partner Selection in Inter-Organisational New Product Development Projects

    DEFF Research Database (Denmark)

    Ruiz, Pedro Parraguez; Maier, Anja

    2016-01-01

    Selecting partners for new product development (NPD) is an important yet under-supported task. Thispaper focuses on decision-making support for the NPD collaboration stages of partner exploration andsearch. We provide a conceptual framework for a network-based platform to identify potential......: technologicalcloseness, relational closeness, geographical closeness and a set of organisational variables. In order toidentify a subset of new product development partners and aid the selection process, three characteristicsof NPD projects are considered as mediators of those success factors: the desired degree...... and illustrate with examples the networkbasedplatform to explore NPD partners. The developed framework and platform are part of Net-Sights,an ongoing research project to develop open-source decision-support tools for network insights. Thefirst version of this tool will soon be available as an online platform...

  3. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    International Nuclear Information System (INIS)

    Loll, C.M.

    1994-01-01

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures

  4. 41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?

    Science.gov (United States)

    2010-07-01

    ... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...

  5. Handbook of selected organ doses for projections common in pediatric radiology

    International Nuclear Information System (INIS)

    Rosenstein, M.; Beck, T.J.; Warner, G.G.

    1979-05-01

    This handbook contains data from which absorbed dose (mrad) to selected organs can be estimated for common projections in pediatric radiology. The organ doses are for three reference patients: a newborn (0 to 6 months), a 1-year old child, and a 5-year old child. One intent of the handbook is to permit the user to evaluate the effect on organ dose to these reference pediatric patients as a function of certain changes in technical parameters used in or among facilities. A second intent is to permit a comparison to be made of organ doses as a function of age. This comparison can be extended to a reference adult by referring to the previous Handbook of Selected Organ Doses fo Projections Common in Diagnostic Radiology, FDA 76-8031. Assignment of organ doses to individual pediatric patients using the Handbook data is not recommended unless the physical characteristics of the patient closely correlate with one of the three reference pediatric patients given in Appendix A

  6. Preliminary selection criteria for the Yucca Mountain Project waste package container material

    International Nuclear Information System (INIS)

    Halsey, W.G.

    1991-01-01

    The Department of Energy's Yucca Mountain Project (YMP) is evaluating a site at Yucca Mountain in Nevada for construction of a geologic repository for the storage of high-level nuclear waste. Lawrence Livermore National Laboratory's (LLNL) Nuclear Waste Management Project (NWMP) has the responsibility for design, testing, and performance analysis of the waste packages. The design is performed in an iterative manner in three sequential phases (conceptual design, advanced conceptual design, and license application design). An important input to the start of the advanced conceptual design is the selection of the material for the waste containers. The container material is referred to as the 'metal barrier' portion of the waste package, and is the responsibility of the Metal Barrier Selection and Testing task at LLNL. The selection will consist of several steps. First, preliminary, material-independent selection criteria will be established based on the performance goals for the container. Second, a variety of engineering materials will be evaluated against these criteria in a screening process to identify candidate materials. Third, information will be obtained on the performance of the candidate materials, and final selection criteria and quantitative weighting factors will be established based on the waste package design requirements. Finally, the candidate materials will be ranked against these criteria to determine whether they meet the mandated performance requirements, and to provide a comparative score to choose the material for advanced conceptual design activities. This document sets forth the preliminary container material selection criteria to be used in screening candidate materials. 5 refs

  7. [A Method for Selecting Self-Adoptive Chromaticity of the Projected Markers].

    Science.gov (United States)

    Zhao, Shou-bo; Zhang, Fu-min; Qu, Xing-hua; Zheng, Shi-wei; Chen, Zhe

    2015-04-01

    The authors designed a self-adaptive projection system which is composed of color camera, projector and PC. In detail, digital micro-mirror device (DMD) as a spatial light modulator for the projector was introduced in the optical path to modulate the illuminant spectrum based on red, green and blue light emitting diodes (LED). However, the color visibility of active markers is affected by the screen which has unknown reflective spectrum as well. Here active markers are projected spot array. And chromaticity feature of markers is sometimes submerged in similar spectral screen. In order to enhance the color visibility of active markers relative to screen, a method for selecting self-adaptive chromaticity of the projected markers in 3D scanning metrology is described. Color camera with 3 channels limits the accuracy of device characterization. For achieving interconversion of device-independent color space and device-dependent color space, high-dimensional linear model of reflective spectrum was built. Prior training samples provide additional constraints to yield high-dimensional linear model with more than three degrees of freedom. Meanwhile, spectral power distribution of ambient light was estimated. Subsequently, markers' chromaticity in CIE color spaces was selected via maximization principle of Euclidean distance. The setting values of RGB were easily estimated via inverse transform. Finally, we implemented a typical experiment to show the performance of the proposed approach. An 24 Munsell Color Checker was used as projective screen. Color difference in the chromaticity coordinates between the active marker and the color patch was utilized to evaluate the color visibility of active markers relative to the screen. The result comparison between self-adaptive projection system and traditional diode-laser light projector was listed and discussed to highlight advantage of our proposed method.

  8. Deadline Compliance Status Reports

    Data.gov (United States)

    Department of Housing and Urban Development — These monthly Deadline Compliance Status Reports assist Participating Jurisdictions and HUD Field Offices in monitoring compliance with the 2-year commitment and...

  9. Evaluation and selection of decision-making methods to assess landfill mining projects.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Ragossnig, Arne; Pomberger, Roland

    2015-09-01

    For the first time in Austria, fundamental technological and economic studies on recovering secondary raw materials from large landfills have been carried out, based on the 'LAMIS - Landfill Mining Austria' pilot project. A main focus of the research - and the subject of this article - was to develop an assessment or decision-making procedure that allows landfill owners to thoroughly examine the feasibility of a landfill mining project in advance. Currently there are no standard procedures that would sufficiently cover all the multiple-criteria requirements. The basic structure of the multiple attribute decision making process was used to narrow down on selection, conceptual design and assessment of suitable procedures. Along with a breakdown into preliminary and main assessment, the entire foundation required was created, such as definitions of requirements to an assessment method, selection and accurate description of the various assessment criteria and classification of the target system for the present 'landfill mining' vs. 'retaining the landfill in after-care' decision-making problem. Based on these studies, cost-utility analysis and the analytical-hierarchy process were selected from the range of multiple attribute decision-making procedures and examined in detail. Overall, both methods have their pros and cons with regard to their use for assessing landfill mining projects. Merging these methods or connecting them with single-criteria decision-making methods (like the net present value method) may turn out to be reasonable and constitute an appropriate assessment method. © The Author(s) 2015.

  10. Compliance. Regulatory policy P-211

    International Nuclear Information System (INIS)

    2001-05-01

    This regulatory policy describes the basic principles and directives for establishing and conducting the Canadian Nuclear Safety Commission (CNSC) Compliance Program. The program is aimed at securing compliance by regulated persons with regulatory requirements made under the Nuclear Safety and Control Act ('the Act'). The policy applies to persons who are regulated by the CNSC through the Act, regulations and licences, as well as by decisions and orders made under the Act. The policy applies to officers and employees of the CNSC, and its authorized representatives or agents, who are involved in developing and carrying out compliance activities. Compliance, in the context of this policy, means conformity by regulated persons with the legally binding requirements of the Act, and the CNSC regulations, licences, decisions, and orders made under the Act. Compliance activities are CNSC measures of promotion, verification and enforcement aimed at securing compliance by regulated person with the applicable legally binding requirements. (author)

  11. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  12. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  13. Short- and long-term effects of clinical audits on compliance with procedures in CT scanning

    International Nuclear Information System (INIS)

    Oliveri, Antonio; Howarth, Nigel; Gevenois, Pierre Alain; Tack, Denis

    2016-01-01

    To test the hypothesis that quality clinical audits improve compliance with the procedures in computed tomography (CT) scanning. This retrospective study was conducted in two hospitals, based on 6950 examinations and four procedures, focusing on the acquisition length in lumbar spine CT, the default tube current applied in abdominal un-enhanced CT, the tube potential selection for portal phase abdominal CT and the use of a specific ''paediatric brain CT'' procedure. The first clinical audit reported compliance with these procedures. After presenting the results to the stakeholders, a second audit was conducted to measure the impact of this information on compliance and was repeated the next year. Comparisons of proportions were performed using the Chi-square Pearson test. Depending on the procedure, the compliance rate ranged from 27 to 88 % during the first audit. After presentation of the audit results to the stakeholders, the compliance rate ranged from 68 to 93 % and was significantly improved for all procedures (P ranging from <0.001 to 0.031) in both hospitals and remained unchanged during the third audit (P ranging from 0.114 to 0.999). Quality improvement through repeated compliance audits with CT procedures durably improves this compliance. (orig.)

  14. 12 CFR 1710.19 - Compliance and risk management programs; compliance with other laws.

    Science.gov (United States)

    2010-01-01

    ... OVERSIGHT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SAFETY AND SOUNDNESS CORPORATE GOVERNANCE Corporate Practices and Procedures § 1710.19 Compliance and risk management programs; compliance with other laws. (a...

  15. Bibliography of the SAIL Panama Canal Zone Project 2008 : a selected bibliography.

    OpenAIRE

    DeHart, Liz

    2009-01-01

    During the 18th Annual 2008 SAIL meeting at the Smithsonian Tropical Research Institute in Panama, Vielka Chang-Yau, librarian, mentioned the need to digitize and make available through the Aquatic Commons some of the early documents related to the U.S. biological survey of Panama from 1910 to 1912. With the assistance of SAIL, a regional marine librarian’s group, a digital project developed and this select bibliography represents the sources used for the project. It will assist research...

  16. Feature Subset Selection and Instance Filtering for Cross-project Defect Prediction - Classification and Ranking

    Directory of Open Access Journals (Sweden)

    Faimison Porto

    2016-12-01

    Full Text Available The defect prediction models can be a good tool on organizing the project's test resources. The models can be constructed with two main goals: 1 to classify the software parts - defective or not; or 2 to rank the most defective parts in a decreasing order. However, not all companies maintain an appropriate set of historical defect data. In this case, a company can build an appropriate dataset from known external projects - called Cross-project Defect Prediction (CPDP. The CPDP models, however, present low prediction performances due to the heterogeneity of data. Recently, Instance Filtering methods were proposed in order to reduce this heterogeneity by selecting the most similar instances from the training dataset. Originally, the similarity is calculated based on all the available dataset features (or independent variables. We propose that using only the most relevant features on the similarity calculation can result in more accurate filtered datasets and better prediction performances. In this study we extend our previous work. We analyse both prediction goals - Classification and Ranking. We present an empirical evaluation of 41 different methods by associating Instance Filtering methods with Feature Selection methods. We used 36 versions of 11 open source projects on experiments. The results show similar evidences for both prediction goals. First, the defect prediction performance of CPDP models can be improved by associating Feature Selection and Instance Filtering. Second, no evaluated method presented general better performances. Indeed, the most appropriate method can vary according to the characteristics of the project being predicted.

  17. Georgia Compliance Review Self-Study FY 01.

    Science.gov (United States)

    Georgia State Dept. of Education, Atlanta.

    Intended for evaluation of local compliance with special education federal and state legal requirements, this compliance review document includes both the compliance requirements and the criteria by which compliance is determined during the onsite compliance review of Georgia local school systems and state-operated programs. Each legal requirement…

  18. 14 CFR 26.49 - Compliance plan.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Compliance plan. 26.49 Section 26.49... Data for Repairs and Alterations § 26.49 Compliance plan. (a) Compliance plan. Except for applicants... January 11, 2008, each person identified in §§ 26.43, 26.45, and 26.47, must submit a compliance plan...

  19. Explaining G20 and BRICS Compliance

    Directory of Open Access Journals (Sweden)

    Marina Larionova

    2016-11-01

    Full Text Available This article explores the internal and external factors influencing the compliance performance of the Group of 20 (G20 and the BRICS. The authors start with an overview of the G20 and BRICS compliance patterns using comparative data onthe number of commitments made by the two institutions, the level of institutional compliance, and distribution of commitments and compliance across issue areas. G20 compliance is traced since the leaders’ first 2008 summit in Washington. The BRICS compliance performance record includes data since the third stand alone summit in Sanya in 2011.The study then takes stock of compliance catalysts embedded in the summits’ discourse: priority placements, numerical targets, timelines, self-accountability pledges and mandates to implement and/or monitor implementation. The authors review trends in the use of catalysts in different years and issue areas and identify commonalities and differences.The analysis then turns to external causes of compliance and focuses on demand for collective actions and members’ collective power to respond and deliver on their pledges. Here the study explores whether the self-accountability mechanisms created by the institutions in response to the demand for effectiveness and legitimacy facilitate compliance.The article concludes by highlighting catalysts, causes of compliance and their combinations with the greatest power to encourage implementation, explaining trends in G20 and BRICS compliance performance. The data sets on G20 and BRICS differ in terms of scale. The G20 data set contains 1,511 commitments of which 114 have been monitored, and the BRICS data set contains 231 commitments of which 23 have been monitored.

  20. Motivation for Compliance with Environmental Regulation

    DEFF Research Database (Denmark)

    Winter, Søren; May, Peter J.

    2001-01-01

    A combination of calculated, normative, and social motivations as well as awareness of rules and capacity to comply are thought to foster compliance with regulations. Hypotheses about these factors were tested with data concerning Danish farmers’ compliance with agro-environmental regulations....... Three key findings emerge: that farmers’ awareness of rules plays a critical role; that normative and social motivations are as influential as calculated motivations in enhancing compliance; and that inspectors’ enforcement style affects compliance differently from that posited in much of the literature...... compliance with social and environmental regulations....

  1. 28 CFR 91.68 - Compliance with other Federal environmental statutes, regulations and executive orders.

    Science.gov (United States)

    2010-07-01

    ... OF JUSTICE (CONTINUED) GRANTS FOR CORRECTIONAL FACILITIES Environmental Impact Review Procedures for VOI/TIS Grant Program Other State and Federal Law Requirements § 91.68 Compliance with other Federal environmental statutes, regulations and executive orders. (a) Other Federal environmental laws. All projects...

  2. Compliance with air quality regulations

    International Nuclear Information System (INIS)

    Steen, D.V.; Tackett, D.L.

    1990-01-01

    Due to the probable passage of Clean Air Act Amendments in 1990, electric utilities throughout the United States are faced with numerous choices to comply with the new acid rain regulations, expected in 1991. The choice of a compliance plan is not a simple task. Every compliance option will be costly. At Ohio Edison, deliberations are quite naturally influenced by past compliance with air quality regulations. This paper discusses compliance with air quality regulations in the 1970's, clean coal technologies and advanced scrubbers, and compliance with air quality regulations in 1995 - 2000. The choice of a compliance strategy for many utilities will involve serving customer loads through some combination of scrubbers, clean coal technologies, fuel switching, fuel blending, redispatch of units, and emissions trading. Whatever the final choice, it must be economic while providing sufficient flexibility to accommodate the critical uncertainties of load growth, state regulatory treatment, markets for emission allowances, advancements in control technologies, additional federal requirements for air emissions, equipment outages and fuel supply disruptions.s

  3. Stakeholder-driven multi-attribute analysis for energy project selection under uncertainty

    International Nuclear Information System (INIS)

    Read, Laura; Madani, Kaveh; Mokhtari, Soroush; Hanks, Catherine

    2017-01-01

    In practice, selecting an energy project for development requires balancing criteria and competing stakeholder priorities to identify the best alternative. Energy source selection can be modeled as multi-criteria decision-maker problems to provide quantitative support to reconcile technical, economic, environmental, social, and political factors with respect to the stakeholders' interests. Decision making among these complex interactions should also account for the uncertainty present in the input data. In response, this work develops a stochastic decision analysis framework to evaluate alternatives by involving stakeholders to identify both quantitative and qualitative selection criteria and performance metrics which carry uncertainties. The developed framework is illustrated using a case study from Fairbanks, Alaska, where decision makers and residents must decide on a new source of energy for heating and electricity. We approach this problem in a five step methodology: (1) engaging experts (role players) to develop criteria of project performance; (2) collecting a range of quantitative and qualitative input information to determine the performance of each proposed solution according to the selected criteria; (3) performing a Monte-Carlo analysis to capture uncertainties given in the inputs; (4) applying multi-criteria decision-making, social choice (voting), and fallback bargaining methods to account for three different levels of cooperation among the stakeholders; and (5) computing an aggregate performance index (API) score for each alternative based on its performance across criteria and cooperation levels. API scores communicate relative performance between alternatives. In this way, our methodology maps uncertainty from the input data to reflect risk in the decision and incorporates varying degrees of cooperation into the analysis to identify an optimal and practical alternative. - Highlights: • We develop an applicable stakeholder-driven framework for

  4. Indirect effect of management support on users' compliance behaviour towards information security policies.

    Science.gov (United States)

    Humaidi, Norshima; Balakrishnan, Vimala

    2018-01-01

    Health information systems are innovative products designed to improve the delivery of effective healthcare, but they are also vulnerable to breaches of information security, including unauthorised access, use, disclosure, disruption, modification or destruction, and duplication of passwords. Greater openness and multi-connectedness between heterogeneous stakeholders within health networks increase the security risk. The focus of this research was on the indirect effects of management support (MS) on user compliance behaviour (UCB) towards information security policies (ISPs) among health professionals in selected Malaysian public hospitals. The aim was to identify significant factors and provide a clearer understanding of the nature of compliance behaviour in the health sector environment. Using a survey design and stratified random sampling method, self-administered questionnaires were distributed to 454 healthcare professionals in three hospitals. Drawing on theories of planned behaviour, perceived behavioural control (self-efficacy (SE) and MS components) and the trust factor, an information system security policies compliance model was developed to test three related constructs (MS, SE and perceived trust (PT)) and their relationship to UCB towards ISPs. Results showed a 52.8% variation in UCB through significant factors. Partial least squares structural equation modelling demonstrated that all factors were significant and that MS had an indirect effect on UCB through both PT and SE among respondents to this study. The research model based on the theory of planned behaviour in combination with other human and organisational factors has made a useful contribution towards explaining compliance behaviour in relation to organisational ISPs, with trust being the most significant factor. In adopting a multidimensional approach to management-user interactions via multidisciplinary concepts and theories to evaluate the association between the integrated management

  5. Food service compliance with ISO 14001 and ISO 22000

    Directory of Open Access Journals (Sweden)

    Laura Lyra Santos

    2012-06-01

    Full Text Available OBJECTIVE: The objective of this study was to assess food service environmental and food safety management systems according to two checklists based on ABNT ISO 22000 and 14001. METHODS: This exploratory and descriptive study investigated a-la-carte food services of the Federal District, Brazil. Two checklists were developed to investigate ISO 14001 and 22000 compliance. A total of 37 food services were selected from the list of the Brazilian Association of Bars and Restaurants by simple random sampling. Checklist results were analyzed according to ANVISA resolution nº 275/2002. RESULTS: Only five food services employed dietitians to supervise meal production. These establishments achieved the highest ISO compliance. However, no establishment had more than 50% ISO 14001 or 22000 compliance. Restaurants showed little concern for the environment and disobeyed waste disposal laws by not separating recyclables from non-recyclables. CONCLUSION: The study food services do not have safe meal production systems, evidenced by non-conformity with the reference standards. Additionally, they do not attempt to reduce the environmental impact of their wastes. Food services supervised by dietitians are better prepared to produce safe foods.

  6. Regulatory Enforcement and Compliance

    DEFF Research Database (Denmark)

    May, Peter J.; Winter, Søren

    1999-01-01

    This study of municipal enforcement of agro-environmental regulations in Denmark provides an empirical understanding of how enforcement affects compliance. A key contribution is sorting out the relative influence of inspectors' different styles of enforcement and choices made by enforcement...... agencies. The latter are shown to be more important in bringing about compliance than are inspectors' enforcement styles. Municipal agencies are shown to increase compliance through the use of third parties, more frequent inspection, and setting priorities for inspection of major items. The findings about...

  7. [Schools meals in French secondary state schools: compliance to national recommendations and schools catering patterns].

    Science.gov (United States)

    Bertin, M; Lafay, L; Calamassi-Tran, G; Volatier, J-L; Dubuisson, C

    2011-02-01

    Recent reports on the lack of nutritional quality of meals served in schools have led public authorities to draft, in 1999, recommendations for restoring a balanced food supply. Following the survey carried out by the French food safety Agency in 2005-2006, which highlighted gaps in the implementation of these recommendations, a law passed in July 2010 plans to make these recommendations mandatory, as their 2007 revised version. Thus, the objective of this study was to assess initial school compliance with regard to this last revised version of the recommendations and to identify school patterns through their catering management and implication in a dietary project. Seven hundred and seven secondary state schools were questioned (570 were administrated by the Ministry of Education and 137 by the Ministry of Agriculture) on their catering practices. Twenty consecutive menus from each school were also analyzed with a specific coding system to establish its nutritional composition for comparison with the 2007 recommendations. On average, schools complied with half of the recommendations. Good compliance was observed with the 2007 recommendations concerning fried products, starchy foods, fruits, and dairy products whereas very few schools were in compliance with recommendations concerning fish, cheeses and sweetened desserts containing less than 15 % fat and more than 20 g of sugar per portion. Furthermore, compliance with recommendations was significantly better for lunch meals, and even better for agricultural establishments. A 5-component meal was also associated with greater compliance with the recommendations. In addition, four school patterns were identified based on catering management practices. The first two categories of establishments had knowledge of the recommendations but exhibited different levels of application. The last two types of establishments had no knowledge of the recommendations and differed in their catering management practices. Compliance

  8. Fringe-period selection for a multifrequency fringe-projection phase unwrapping method

    International Nuclear Information System (INIS)

    Zhang, Chunwei; Zhao, Hong; Jiang, Kejian

    2016-01-01

    The multi-frequency fringe-projection phase unwrapping method (MFPPUM) is a typical phase unwrapping algorithm for fringe projection profilometry. It has the advantage of being capable of correctly accomplishing phase unwrapping even in the presence of surface discontinuities. If the fringe frequency ratio of the MFPPUM is too large, fringe order error (FOE) may be triggered. FOE will result in phase unwrapping error. It is preferable for the phase unwrapping to be kept correct while the fewest sets of lower frequency fringe patterns are used. To achieve this goal, in this paper a parameter called fringe order inaccuracy (FOI) is defined, dominant factors which may induce FOE are theoretically analyzed, a method to optimally select the fringe periods for the MFPPUM is proposed with the aid of FOI, and experiments are conducted to research the impact of the dominant factors in phase unwrapping and demonstrate the validity of the proposed method. Some novel phenomena are revealed by these experiments. The proposed method helps to optimally select the fringe periods and detect the phase unwrapping error for the MFPPUM. (paper)

  9. Vendor compliance with Ontario's tobacco point of sale legislation.

    Science.gov (United States)

    Dubray, Jolene M; Schwartz, Robert M; Garcia, John M; Bondy, Susan J; Victor, J Charles

    2009-01-01

    On May 31, 2006, Ontario joined a small group of international jurisdictions to implement legislative restrictions on tobacco point of sale promotions. This study compares the presence of point of sale promotions in the retail tobacco environment from three surveys: one prior to and two following implementation of the legislation. Approximately 1,575 tobacco vendors were randomly selected for each survey. Each regionally-stratified sample included equal numbers of tobacco vendors categorized into four trade classes: chain convenience, independent convenience and discount, gas stations, and grocery. Data regarding the six restricted point of sale promotions were collected using standardized protocols and inspection forms. Weighted estimates and 95% confidence intervals were produced at the provincial, regional and vendor trade class level using the bootstrap method for estimating variance. At baseline, the proportion of tobacco vendors who did not engage in each of the six restricted point of sale promotions ranged from 41% to 88%. Within four months following implementation of the legislation, compliance with each of the six restricted point of sale promotions exceeded 95%. Similar levels of compliance were observed one year later. Grocery stores had the fewest point of sale promotions displayed at baseline. Compliance rates did not differ across vendor trade classes at either follow-up survey. Point of sale promotions did not differ across regions in any of the three surveys. Within a short period of time, a high level of compliance with six restricted point of sale promotions was achieved.

  10. An ANP-based approach for the selection of photovoltaic solar power plant investment projects

    International Nuclear Information System (INIS)

    Aragones-Beltran, P.; Pastor-Ferrando, J.P.; Rodriguez-Pozo, F.; Chaparro-Gonzalez, F.

    2010-01-01

    In this paper the Analytic Network Process (ANP) is applied to the selection of photovoltaic (PV) solar power projects. These projects follow a long management and execution process from plant site selection to plant start-up. As a consequence, there are many risks of time delays and even of project stoppage. In the case study presented in this paper a top manager of an important Spanish company that operates in the power market has to decide on the best PV project (from four alternative projects) to invest based on risk minimization. The manager identified 50 project execution delay and/or stoppage risks. The influences between the elements of the network (groups of risks and alternatives) were identified and analyzed using the ANP multicriteria decision analysis method. Two different ANP models were used: one hierarchy model (that considers AHP as a particular case of ANP) and one network-based model. The results obtained in each model were compared and analyzed. The main conclusion is that unlike the other models used in the study, the single network model can manage all the information of the real-world problem and thus it is the decision analysis model recommended by the authors. The strengths and weaknesses of ANP as a multicriteria decision analysis tool are also described in the paper. (author)

  11. Project Specific Quality Assurance Plan Project (QAPP) W-211 Initial Tank Retrieval Systems (ITRS)

    International Nuclear Information System (INIS)

    HALL, L.R.

    2000-01-01

    This Quality Assurance Program Plan (QAPP) provides information on how the Project Hanford Quality Assurance Program is implemented by CH2M HILL Hanford Group Inc (CHG) for managing the Initial Tank Retrieval Systems (ITRS), Project W-211. This QAPP is responsive to the CHG Quality Assurance Program Description (QAPD) (LMH-MP-599) which provides direction for compliance to 10 CFR 830 120, ''Nuclear Safety Management, Quality Assurance Requirements'', and DOE Order 5700 6C, ''Quality Assurance'' Project W-211 modifies existing facilities and provides systems for retrieval of radioactive wastes from selected double-shell tanks (DST). The contents of these tanks are a combination of supernatant liquids and settled solids. To retrieve waste from the tanks, it is first necessary to mix the liquid and solids prior to transferring the slurry to alternative storage or treatment facilities. The ITRS will provide systems to mobilize the settled solids and transfer the wastes out of the tanks. In so doing, ITRS provides feed for future processing plants, allows for consolidation of tank solids to manage space within existing DST storage capacity, and supports continued safe storage of tank waste. This project includes the design, procurement, construction, startup and turnover of these retrieval systems This QAPP identifies organizational structures and responsibilities. Implementing procedures used by CHG project management can be found in the CHG Quality Assurance Program (CHG QAP) Implementation Matrix located in HNF-IP-0842, Volume XI, Attachment Proposed verification and inspection activities for critical items within the scope of project W-211 are identified in Attachment 1 W-211. Project participants will identify the implementing procedures used by their organization within their QAF'Ps. This project specific QAPP is used to identify requirements in addition to the QAPD and provide, by reference, additional information to other project documents

  12. 340 Facility compliance assessment

    International Nuclear Information System (INIS)

    English, S.L.

    1993-10-01

    This study provides an environmental compliance evaluation of the RLWS and the RPS systems of the 340 Facility. The emphasis of the evaluation centers on compliance with WAC requirements for hazardous and mixed waste facilities, federal regulations, and Westinghouse Hanford Company (WHC) requirements pertinent to the operation of the 340 Facility. The 340 Facility is not covered under either an interim status Part A permit or a RCRA Part B permit. The detailed discussion of compliance deficiencies are summarized in Section 2.0. This includes items of significance that require action to ensure facility compliance with WAC, federal regulations, and WHC requirements. Outstanding issues exist for radioactive airborne effluent sampling and monitoring, radioactive liquid effluent sampling and monitoring, non-radioactive liquid effluent sampling and monitoring, less than 90 day waste storage tanks, and requirements for a permitted facility

  13. The responsibility of the contractor for project deficiencies

    Directory of Open Access Journals (Sweden)

    Pušac Jovana

    2011-01-01

    Full Text Available In this paper the author analyzes a civil law responsibility of the Contractor for project deficiencies resulting in reduced quality of the construction, i.e. not affecting its solidity. Primary obligation of the Contractor is to perform works in compliance with professional standards, the contract and the approved project. The Contractor cannot change the approved project at will, even when he has designed it. Hence, the question must be raised of the obligation of the Contractor to strictly abide by the project, assigned to him by the Authority, regardless of evident deficiencies of the Project and of his responsibility for performing works in compliance with the said project resulting in deficiencies in the construction, that is construction works. If the latter hypothesis is correct, then it must be established what deficiencies in the project fall under the responsibility of the Contractor (visible or hidden, i.e. the issue of dividing responsibility between the Project Designer and the Contractor in terms of the project deficiencies must be set up and solved. Finally, it is also important to define the realization of rights and duties of the Contractor in case the Contractor has to recede from the Project. In this paper the author tries to offer detail and complete answers to raised questions.

  14. Site Observational Work Plan for the UMTRA Project Site at Shiprock, New Mexico. Revision

    International Nuclear Information System (INIS)

    1995-07-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is one of the first documents for developing an approach for achieving ground water compliance at the site. This SOWP applies Shiprock site information to a regulatory compliance framework, which identifies strategies for meeting ground water compliance at the site. The compliance framework was developed in the UMTRA ground water programmatic environmental impact statement

  15. SEISMIC DESIGN REQUIREMENTS SELECTION METHODOLOGY FOR THE SLUDGE TREATMENT and M-91 SOLID WASTE PROCESSING FACILITIES PROJECTS

    International Nuclear Information System (INIS)

    RYAN GW

    2008-01-01

    In complying with direction from the U.S. Department of Energy (DOE), Richland Operations Office (RL) (07-KBC-0055, 'Direction Associated with Implementation of DOE-STD-1189 for the Sludge Treatment Project,' and 08-SED-0063, 'RL Action on the Safety Design Strategy (SDS) for Obtaining Additional Solid Waste Processing Capabilities (M-91 Project) and Use of Draft DOE-STD-I 189-YR'), it has been determined that the seismic design requirements currently in the Project Hanford Management Contract (PHMC) will be modified by DOE-STD-1189, Integration of Safety into the Design Process (March 2007 draft), for these two key PHMC projects. Seismic design requirements for other PHMC facilities and projects will remain unchanged. Considering the current early Critical Decision (CD) phases of both the Sludge Treatment Project (STP) and the Solid Waste Processing Facilities (M-91) Project and a strong intent to avoid potentially costly re-work of both engineering and nuclear safety analyses, this document describes how Fluor Hanford, Inc. (FH) will maintain compliance with the PHMC by considering both the current seismic standards referenced by DOE 0 420.1 B, Facility Safety, and draft DOE-STD-1189 (i.e., ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, and ANSI ANS 2.26-2004, Categorization of Nuclear Facility Structures, Systems and Components for Seismic Design, as modified by draft DOE-STD-1189) to choose the criteria that will result in the most conservative seismic design categorization and engineering design. Following the process described in this document will result in a conservative seismic design categorization and design products. This approach is expected to resolve discrepancies between the existing and new requirements and reduce the risk that project designs and analyses will require revision when the draft DOE-STD-1189 is finalized

  16. Characteristics of Criteria for Selecting Investment Projects under Uncertainty

    Directory of Open Access Journals (Sweden)

    Adrian ENCIU

    2011-07-01

    Full Text Available Within financial theory and practice, there are used five main criteria for selecting investment projects: the net present value (NPV criterion, the internal rate of return (IRR criterion, the return term (RT criterion, the profitability ratio (PR criterion and the supplementary return (SR criterion. The assay will emphasize several new properties of said indexes for investment assessment, having as starting point the hypotheses of (approximately normal repartition of cash-flows generated by an investment project. The obtained results point to the fact that the NPV indexes (the analysis of this criterion was carried out in the article “The NPV Criterion for Valuing Investments under Uncertainty”, Daniel Armeanu, Leonard Lache, Economic Computation and Economic Cybernetics Studies and Research no. 4/2009, pp. 133-143, IRR, PR, RT and SR register normal repartitions, therefore simplifying the investment analysis under economic uncertainty, by the capacity of building confidence intervals and assessing probabilities for the inferior limits of said investment assessment indexes.

  17. Identification of factors involved in medication compliance: incorrect inhaler technique of asthma treatment leads to poor compliance

    Directory of Open Access Journals (Sweden)

    Darbà J

    2016-02-01

    Full Text Available Josep Darbà,1 Gabriela Ramírez,2 Antoni Sicras,3 Laura García-Bujalance,4 Saku Torvinen,5 Rainel Sánchez-de la Rosa6 1Department of Economics, Universitat de Barcelona, 2BCN Health Economics & Outcomes Research S.L., 3Department of Planning, Badalona Serveis Assistencials S.A., Barcelona, 4Market Access Department, Teva Pharmaceutical, Madrid, Spain; 5Market Access Department, Teva Pharmaceuticals Europe BV, Amsterdam, the Netherlands; 6Medical Department, Teva Pharmaceutical, Madrid, Spain Objective: To identify the impact of delivery device of inhaled corticosteroids and long-acting β2-agonist (ICS/LABA on asthma medication compliance, and investigate other factors associated with compliance. Materials and methods: We conducted a retrospective and multicenter study based on a review of medical registries of asthmatic patients treated with ICS/LABA combinations (n=2,213 whose medical devices were either dry powder inhalers (DPIs, such as Accuhaler®, Turbuhaler®, and NEXThaler® or pressurized metered-dose inhalers (pMDI. Medication compliance included persistence outcomes through 18 months and medication possession ratios. Data on potential confounders of treatment compliance such as asthma exacerbations, comorbidities, demographic characteristics, and health care resource utilization were also explored. Results: The probability of asthma medication compliance in case of DPIs was lower compared to pMDIs, which suggests that inhaler devices influence inhalation therapies. There were additional confounding factors that were considered as explanatory variables of compliance. A worse measure of airflow obstruction (forced expiration volume in 1 second, comorbidities and general practitioner (GP consultations more than once per month decreased the probability of compliance. Within comorbidities, alcoholism was positively associated with compliance. Patients of 29–39, 40–50, and 51–61 age groups or suffering from more than two

  18. Compliance and Enforcement Actions (CEA) -

    Data.gov (United States)

    Department of Transportation — Compliance and Enforcement Actions application provides process assistance / improvements for conducting investigation and enforcement activities. The Compliance and...

  19. ISSUES REGARDING THE FINANCIAL FLOW PROJECTIONS IN THE SELECTION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Mariana Rodica ŢÎRLEA

    2015-06-01

    Full Text Available For a company, through investment activities, it is followed to either create new abilities or expand the existing abilities, the partial or complete replacement of existing technical base or its modernization. In the condition that it is desired the creation of a technical base, the investment involves the purchase of fixed capital that can materialize in: buildings, special buildings, land, vehicles, facilities, equipment, etc. In terms of expansion and modernization, investment implies the existence of a material base on which should be intervened wholly or partly by its development or modernization. For the selection of investment projects in the context of investment strategy established at enterprise level through a Financial justification and prioritization of investments this should lead to the achievement of the objectives set at its level.

  20. Effluent monitoring Quality Assurance Project Plan for radioactive airborne emissions data. Revision 2

    International Nuclear Information System (INIS)

    Frazier, T.P.

    1995-12-01

    This Quality Assurance Project Plan addresses the quality assurance requirements for compiling Hanford Site radioactive airborne emissions data. These data will be reported to the U.S. Environmental Protection Agency, the US Department of Energy, and the Washington State Department of Health. Effluent Monitoring performs compliance assessments on radioactive airborne sampling and monitoring systems. This Quality Assurance Project Plan is prepared in compliance with interim guidelines and specifications. Topics include: project description; project organization and management; quality assurance objectives; sampling procedures; sample custody; calibration procedures; analytical procedures; monitoring and reporting criteria; data reduction, verification, and reporting; internal quality control; performance and system audits; corrective actions; and quality assurance reports

  1. Notification: Audit of the U.S. EPA's Compliance with the Federal Information Security Management Act (FISMA)

    Science.gov (United States)

    Project #OA-FY13-0280, May 9, 2013. The Office of Inspector General plans to begin fieldwork for an audit of the U.S. Environmental Protection Agency’s compliance with the Federal Information Security Management Act.

  2. Strategisk compliance og regulering

    DEFF Research Database (Denmark)

    Kühn Pedersen, Mogens

    2016-01-01

    Denne artikel introducerer strategisk compliance og påpeger dens samspil med klassiske og nyere former for reguleringer i digital værdiskabelse. Konteksten er den digitale økonomi, som vokser frem imellem den materielle økonomis bærepiller: Virksomheder og markeder, men består af en helt ny...... materialitet, som er det digitale univers og dets modsvarighed i nye krav til compliance. Den nye materialitet stiller nye krav, hvad angår digitale processer og transaktioner. Klassisk regulering, som aktører ikke selv kan ændre, støder på egenregulering, hvor aktørerne selv opsætter regler for at skabe...... digital værdi. Dette kalder på strategisk compliance. Med digitalisering er strategisk compliance sat på dagsordnen i reguleringsdebatten. Vi hævder, at regulering og egenregulering kan komme til at virke komplementært i det post-industrielle, digitaliserede samfund....

  3. Factors influencing patient compliance with therapeutic regimens in chronic heart failure: A critical incident technique analysis.

    Science.gov (United States)

    Strömberg, A; Broström, A; Dahlström, U; Fridlund, B

    1999-01-01

    The aim of this study was to identify factors influencing compliance with prescribed treatment in patients with chronic heart failure. A qualitative design with a critical incident technique was used. Incidents were collected through interviews with 25 patients with heart failure strategically selected from a primary health care clinic, a medical ward, and a specialist clinic. Two hundred sixty critical incidents were identified in the interviews and 2 main areas emerged in the analysis: inward factors and outward factors. The inward factors described how compliance was influenced by the personality of the patient, the disease, and the treatment. The outward factors described how compliance was influenced by social activities, social relationships, and health care professionals. By identifying the inward and outward factors influencing patients with chronic heart failure, health care professionals can assess whether intervention is needed to increase compliance.

  4. Benchmarking of nuclear reactors selected in the frame of GIF project

    International Nuclear Information System (INIS)

    Azpitarte, O; Villanueva, A; Ramos, R; Ramilo, L; Alvarez, M; Yorio, D; Herrero, V

    2012-01-01

    In this article a comparative assessment of the six reactor concepts selected in the frame of the Generation IV International Forum (GIF) project is presented. The assessment was carried out in the areas of Viability of the concept, Design and nuclear safety, Economics, Sustainability, Proliferation resistance, Nuclear fuel, Reprocessing, Materials and Balance of Plant, by means of qualification of chosen performance indicators (author)

  5. Information Security for Compliance with Select Agent Regulations

    Science.gov (United States)

    Lewis, Nick; Campbell, Mark J.

    2015-01-01

    The past decade has seen a significant rise in research on high-consequence human and animal pathogens, many now known as “select agents.” While physical security around these agents is tightly regulated, information security standards are still lagging. The understanding of the threats unique to the academic and research environment is still evolving, in part due to poor communication between the various stakeholders. Perhaps as a result, information security guidelines published by select agent regulators lack the critical details and directives needed to achieve even the lowest security level of the Federal Information Security Management Act (FISMA). While only government agencies are currently required to abide by the provisions of FISMA (unless specified as preconditions for obtaining government grants or contracts—still a relatively rare or narrowly scoped occurrence), the same strategies were recently recommended by executive order for others. We propose that information security guidelines for select agent research be updated to promulgate and detail FISMA standards and processes and that the latter be ultimately incorporated into select agent regulations. We also suggest that information security in academic and research institutions would greatly benefit from active efforts to improve communication among the biosecurity, security, and information technology communities, and from a secure venue for exchange of timely information on emerging threats and solutions in the research environment. PMID:26042864

  6. Information security for compliance with select agent regulations.

    Science.gov (United States)

    Lewis, Nick; Campbell, Mark J; Baskin, Carole R

    2015-01-01

    The past decade has seen a significant rise in research on high-consequence human and animal pathogens, many now known as "select agents." While physical security around these agents is tightly regulated, information security standards are still lagging. The understanding of the threats unique to the academic and research environment is still evolving, in part due to poor communication between the various stakeholders. Perhaps as a result, information security guidelines published by select agent regulators lack the critical details and directives needed to achieve even the lowest security level of the Federal Information Security Management Act (FISMA). While only government agencies are currently required to abide by the provisions of FISMA (unless specified as preconditions for obtaining government grants or contracts--still a relatively rare or narrowly scoped occurrence), the same strategies were recently recommended by executive order for others. We propose that information security guidelines for select agent research be updated to promulgate and detail FISMA standards and processes and that the latter be ultimately incorporated into select agent regulations. We also suggest that information security in academic and research institutions would greatly benefit from active efforts to improve communication among the biosecurity, security, and information technology communities, and from a secure venue for exchange of timely information on emerging threats and solutions in the research environment.

  7. A Hybrid Instance Selection Using Nearest-Neighbor for Cross-Project Defect Prediction

    Institute of Scientific and Technical Information of China (English)

    Duksan Ryu; Jong-In Jang; Jongmoon Baik; Member; ACM; IEEE

    2015-01-01

    Software defect prediction (SDP) is an active research field in software engineering to identify defect-prone modules. Thanks to SDP, limited testing resources can be effectively allocated to defect-prone modules. Although SDP requires suffcient local data within a company, there are cases where local data are not available, e.g., pilot projects. Companies without local data can employ cross-project defect prediction (CPDP) using external data to build classifiers. The major challenge of CPDP is different distributions between training and test data. To tackle this, instances of source data similar to target data are selected to build classifiers. Software datasets have a class imbalance problem meaning the ratio of defective class to clean class is far low. It usually lowers the performance of classifiers. We propose a Hybrid Instance Selection Using Nearest-Neighbor (HISNN) method that performs a hybrid classification selectively learning local knowledge (via k-nearest neighbor) and global knowledge (via na¨ıve Bayes). Instances having strong local knowledge are identified via nearest-neighbors with the same class label. Previous studies showed low PD (probability of detection) or high PF (probability of false alarm) which is impractical to use. The experimental results show that HISNN produces high overall performance as well as high PD and low PF.

  8. Identification of multi-criteria for supplier selection in IT project outsourcing

    Science.gov (United States)

    Fusiripong, Prashaya; Baharom, Fauziah; Yusof, Yuhanis

    2017-10-01

    In the increasing global business competitiveness, most organizations have attempted to determine the suitable external parties to support their core and non-core competency, particularly, in IT project outsourcing. The IT supplier selection is required to apply multi-criteria which comprised tangible criteria and intangible criteria in consider optimal IT supplier. Most researches attempted to identify optimal criteria for selecting IT supplier, however, the criteria cannot be the considered common criteria support the variety of IT outsourcing. Therefore, the study aimed to identify a common set of criteria being used in the various types of IT outsourcing. The common criteria are constructed by multi-criteria and success criteria, which were collected by literature review with comprehensive and comparative approach. Consequently, the researchers are able to identify a common set of criteria adopted in the variety of selection problem IT outsourcing supplier.

  9. Motivation and compliance with intraoral elastics.

    Science.gov (United States)

    Veeroo, Helen J; Cunningham, Susan J; Newton, Jonathon Timothy; Travess, Helen C

    2014-07-01

    Intraoral elastics are commonly used in orthodontics and require regular changing to be effective. Unfortunately, poor compliance with elastics is often encountered, especially in adolescents. Intention for an action and its implementation can be improved using "if-then" plans that spell out when, where, and how a set goal, such as elastic wear, can be put into action. Our aim was to determine the effect of if-then plans on compliance with elastics. To identify common barriers to compliance with recommendations concerning elastic wear, semistructured interviews were carried out with 14 adolescent orthodontic patients wearing intraoral elastics full time. Emerging themes were used to develop if-then plans to improve compliance with elastic wear. A prospective pilot study assessed the effectiveness of if-then planning aimed at overcoming the identified barriers on compliance with elastic wear. Twelve participants were randomized equally into study and control groups; the study group received information about if-then planning. The participants were asked to collect used elastics, and counts of these were used to assess compliance. A wide range of motivational and volitional factors were described by the interviewed participants, including the perceived benefits of elastics, cues to remember, pain, eating, social situations, sports, loss of elastics, and breakages. Compliance with elastic wear was highly variable among patients. The study group returned more used elastics, suggesting increased compliance, but the difference was not significant. The use of if-then plans might improve compliance with elastic wear when compared with routine clinical instructions. Copyright © 2014 American Association of Orthodontists. Published by Mosby, Inc. All rights reserved.

  10. [Insufficient medication compliance in Parkinson's disease].

    Science.gov (United States)

    Aerts, Marjolein B; van der Eijk, Martijn; Kramers, Kees; Bloem, Bastiaan R

    2011-01-01

    Medication compliance is generally suboptimal, particularly in patients with complex polypharmacy. This generic treatment problem is described here for Parkinson's disease (PD). We would expect patients with PD to have good medication compliance, since missed doses immediately result in worsening of symptoms. However, recent research has revealed that PD patients demonstrate poor medication compliance. Poor medication compliance is particularly undesirable for patients with PD because regular intake of medication is required for optimal treatment effect. Possible ways of improving medication compliance are pharmacotherapeutic measures and behavioural interventions. Modern methods of communication (text message reminders) and 'smart' pill dispensers may be beneficial, but the advantages of such interventions have not yet been scientifically studied.

  11. Notification: FY2017 Audit of the CSB's compliance with the Federal Information Security Management Act (FISMA)

    Science.gov (United States)

    Project #, May 23, 2017. The EPA OIG plans to begin fieldwork for an audit of the U.S. Chemical Safety and Hazard Investigation Board’s (CSB’s) compliance with the Federal Information Security Modernization Act of 2014 (FISMA).

  12. Impact of Electronic Tax Registers on VAT Compliance: A Study of ...

    African Journals Online (AJOL)

    The purpose of this study was to assess the impact of use of Electronic Tax Registers (ETRs ) on Value Added Tax (VAT) compliance among private business firms in Kisumu city, Kenya. A sample of 233 private firms was selected from a population of 590 private firms using stratified sampling technique. The data was ...

  13. Therapeutic compliance of first line disease-modifying therapies in patients with multiple sclerosis. COMPLIANCE Study.

    Science.gov (United States)

    Saiz, A; Mora, S; Blanco, J

    2015-05-01

    Non-adherence to disease-modifying therapies (DMTs) in multiple sclerosis may be associated with reduced efficacy. We assessed compliance, the reasons for non-compliance, treatment satisfaction, and quality of life (QoL) of patients treated with first-line therapies. A cross-sectional, multicenter study was conducted that included relapsing multiple sclerosis patients. Compliance in the past month was assessed using Morisky-Green test. Seasonal compliance and reasons for non-compliance were assessed by an ad-hoc questionnaire. Treatment satisfaction and QoL were evaluated by means of TSQM and PRIMUS questionnaires. A total of 220 patients were evaluated (91% relapsing-remitting); the mean age was 39.1 years, 70% were female, and the average time under treatment was 5.4 years. Subcutaneous interferon (IFN) β-1b was used in 23% of the patients, intramuscular IFN β-1a in 21%, subcutaneous IFN β-1a in 37%, and with glatiramer acetate in 19%. The overall compliance was 75%, with no significant differences related to the therapy, and 81% did not report any seasonal variation. Compliant patients had significantly lower disability scores and time of diagnosis, and greater satisfaction with treatment and its effectiveness. Discomfort and flu-like symptoms were the most frequent reasons for non-compliance. The satisfaction and QoL were associated with less disability and number of therapeutic switches. The rate of compliance, satisfaction and QoL in multiple sclerosis patients under DMTs is high, especially for those newly diagnosed, less disabled, and with fewer therapeutic switches. Discomfort and flu-like symptoms associated with injected therapies significantly affect adherence. Copyright © 2013 Sociedad Española de Neurología. Published by Elsevier España, S.L.U. All rights reserved.

  14. Extrinsic incentives and tax compliance

    OpenAIRE

    Sour, Laura; Gutiérrez Andrade, Miguel Ángel

    2011-01-01

    This paper models the impact of extrinsic incentives in a tax compliance model. It also provides experimental evidence that confirms the existence of a positive relationship between rewards and tax compliance. If individuals are audited, rewards for honest taxpayers are effective in increasing the level of tax compliance. These results are particularly relevant in countries where there is little respect for tax law since rewards can contribute to crowding in the intrinsic motivation to comply.

  15. A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence

    Directory of Open Access Journals (Sweden)

    Shi Yin

    2017-01-01

    Full Text Available Nowadays, due to the lack of natural resources and environment problems which have been appearing increasingly, green building is more and more involved in the construction industry. The evaluation and selection of green supplier are a significant part of the development of green building. In this paper, we propose a new dynamic multicriteria decision-making approach in construction projects under time sequence to deal with these problems. First, the paper establishes 4 main criteria and 17 subcriteria for green supplier selection in construction projects. Then, a method considering interaction between criteria and the influence of constructors subjective preference and objective criteria information is proposed. It uses the interval-valued intuitionistic fuzzy geometric weighted Heronian means (IVIFGWHM operator and multitarget nonlinear programming model to calculate the comprehensive evaluation results of potential green suppliers. The proposed method is much easier for constructors to select green supplier and make the localization of green supplier more practical and accurate in construction projects. Finally, a case study about a green building project is given to verify practicality and effectiveness of the proposed approach.

  16. Compliance with Prevention Practices and their Association with Central Line-Associated Blood Stream Infections in Neonatal Intensive Care Units

    Science.gov (United States)

    Zachariah, Philip; Furuya, E. Yoko; Edwards, Jeffrey; Dick, Andrew; Liu, Hangsheng; Herzig, Carolyn; Pogorzelska-Maziarz, Monika; Stone, Patricia W.; Saiman, Lisa

    2014-01-01

    Background Bundles and checklists have been shown to decrease CLABSIs, but implementation of these practices and association with CLABSI rates have not been described nationally. We describe implementation and levels of compliance with prevention practices in a sample of US Neonatal ICUs and assess their association with CLABSI rates. Methods An online survey assessing infection prevention practices was sent to hospitals participating in National Healthcare Safety Network CLABSI surveillance in October 2011. Participating hospitals permitted access to their NICU CLABSI rates. Multivariable regressions were used to test the association between compliance with NICU specific CLABSI prevention practices and corresponding CLABSI rates. Results Overall, 190 Level II/III and Level III NICUs participated. The majority of NICUs had written policies (84%-93%) and monitored compliance with bundles and checklists (88% - 91%). Reporting ≥ 95% compliance for any of the practices ranged from 50%- 63%. Reporting ≥ 95% compliance with insertion checklist and assessment of daily line necessity were significantly associated with lower CLABSI rates (pprevention policies and monitor compliance, although reporting compliance ≥ 95% was suboptimal. Reporting ≥ 95% compliance with select CLABSI prevention practices was associated with lower CLABSI rates. Further studies should focus on identifying and improving compliance with effective CLABSI prevention practices in neonates. PMID:25087136

  17. Project plan for the background soils project for the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The Background Soils Project for the Paducah Gaseous Diffusion Plant (BSPP) will determine the background concentration levels of selected naturally occurring metals, other inorganics, and radionuclides in soils from uncontaminated areas in proximity to the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The data will be used for comparison with characterization and compliance data for soils, with significant differences being indicative of contamination. All data collected as part of this project will be in addition to other background databases established for the PGDP. The BSPP will address the variability of surface and near-surface concentration levels with respect to (1) soil taxonomical types (series) and (2) soil sampling depths within a specific soil profile. The BSPP will also address the variability of concentration levels in deeper geologic formations by collecting samples of geologic materials. The BSPP will establish a database, with recommendations on how to use the data for contaminated site assessment, and provide data to estimate the potential human and health and ecological risk associated with background level concentrations of potentially hazardous constituents. BSPP data will be used or applied as follows.

  18. Project plan for the background soils project for the Paducah Gaseous Diffusion Plant, Paducah, Kentucky

    International Nuclear Information System (INIS)

    1995-09-01

    The Background Soils Project for the Paducah Gaseous Diffusion Plant (BSPP) will determine the background concentration levels of selected naturally occurring metals, other inorganics, and radionuclides in soils from uncontaminated areas in proximity to the Paducah Gaseous Diffusion Plant (PGDP) in Paducah, Kentucky. The data will be used for comparison with characterization and compliance data for soils, with significant differences being indicative of contamination. All data collected as part of this project will be in addition to other background databases established for the PGDP. The BSPP will address the variability of surface and near-surface concentration levels with respect to (1) soil taxonomical types (series) and (2) soil sampling depths within a specific soil profile. The BSPP will also address the variability of concentration levels in deeper geologic formations by collecting samples of geologic materials. The BSPP will establish a database, with recommendations on how to use the data for contaminated site assessment, and provide data to estimate the potential human and health and ecological risk associated with background level concentrations of potentially hazardous constituents. BSPP data will be used or applied as follows

  19. 36 CFR 1010.14 - Review of proposals by project applicants.

    Science.gov (United States)

    2010-07-01

    ...) With respect to each project proposed for consideration for which the NEPA Compliance Coordinator... the scope and content of the final EA. (e) With respect to each project proposed for consideration for... Trust and who certify that they have no financial or other interest in the outcome of the project, and...

  20. Manager Factor Associated to the Compliance of Local Smoke-Free Regulation among Star Hotels in Badung District

    Directory of Open Access Journals (Sweden)

    Ni Luh Putu Devhy

    2015-04-01

    Full Text Available Background and purpose: Smoke-free area regulation has been issued recently in Bali Province and Badung District. This study aimed to identify factors associated to the compliance of local smoke-free regulation in star hotel. Methods: This study was a cross-sectional analytic study conducted in Badung District from March to May 2014. Samples of numbered 104 hotels and the managers that selected using systematic random sampling. Compliance data collected through observation using the observation form and the data of managers through interviews using a structured questionnaire. Data were analyzed using chi-square test and poisson regression. Result: The results shows that the compliance of star hotel to local smoke-free regulation was low (15.4%. The concrete support of hotel managers was significantly associated with the compliance to smoke free regulation (PR=4.25; 95%CI: 1.03-17.58. The factors that not significantly associated to the compliance were the knowledge (PR=2.0; 95%CI: 0.8-4.9, attitude (PR=2.5; 95%CI: 0.8-8.2, and organization support (PR=1.8; 95%CI: 0.7-4.5. Furthermore the hotel compliance of managers who have smoking behavior was 0% while the managers without smoking behavior, the compliance was 19.5%. Conclusion: The compliance of star hotels in Badung District on the implementation of local smoke-free regulation was relatively low and the compliance was associated with the presence of concrete support of the hotel managers. Keywords: compliance, local smoke-free legislation, star hotel

  1. 22 CFR 209.6 - Compliance information.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Compliance information. 209.6 Section 209.6... § 209.6 Compliance information. (a) Cooperation and assistance. The Administrator shall to the fullest... and accurate compliance reports at such times, and in such form and containing such information, as...

  2. The USAID Environmental Compliance Database

    Data.gov (United States)

    US Agency for International Development — The Environmental Compliance Database is a record of environmental compliance submissions with their outcomes. Documents in the database can be found by visiting the...

  3. 24 CFR 107.40 - Compliance meeting.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Compliance meeting. 107.40 Section... NONDISCRIMINATION AND EQUAL OPPORTUNITY IN HOUSING UNDER EXECUTIVE ORDER 11063 § 107.40 Compliance meeting. (a... allegedly in violation (respondent) shall be sent a Notice of Compliance Meeting and requested to attend a...

  4. Managing compliance risk after Mifid

    OpenAIRE

    P. Musile Tanzi; G. Gabbi; D. Previati; P. Schwizer

    2013-01-01

    Purpose – The purpose of this paper is to focus on changes in the compliance function within major European banks and other financial intermediaries and on the effects of Markets in Financial Instruments Directive (MiFID) implementation. Design/methodology/approach – The four areas of research seek to answer the following questions: Is the positioning of the compliance function “at the top” of the organizational structure? Are the roles attributed to the compliance function, th...

  5. Exercise Countermeasures Demonstration Project During the Lunar-Mars Life Support Test Project Phase 2A

    Science.gov (United States)

    Lee, Stuart M. C.; Guilliams, Mark E.; Moore, Alan D., Jr.; Williams, W. Jon; Greenisen, M. C.; Fortney, S. M.

    1998-01-01

    This demonstration project assessed the crew members' compliance to a portion of the exercise countermeasures planned for use onboard the International Space Station (ISS) and the outcomes of their performing these countermeasures. Although these countermeasures have been used separately in other projects and investigations, this was the first time they'd been used together for an extended period (60 days) in an investigation of this nature. Crew members exercised every day for six days, alternating every other day between aerobic and resistive exercise, and rested on the seventh day. On the aerobic exercise days, subjects exercised on an electronically braked cycle ergometer using a protocol that has been previously shown to maintain aerobic capacity in subjects exposed to a space flight analogue. On the resistive exercise days, crew members performed five major multijoint resistive exercises in a concentric mode, targeting those muscle groups and bones we believe are most severely affected by space flight. The subjects favorably tolerated both exercise protocols, with a 98% compliance to aerobic exercise prescription and a 91% adherence to the resistive exercise protocol. After 60 days, the crew members improved their peak aerobic capacity by an average 7%, and strength gains were noted in all subjects. These results suggest that these exercise protocols can be performed during ISS, lunar, and Mars missions, although we anticipate more frequent bouts with both protocols for long-duration spaceflight. Future projects should investigate the impact of increased exercise duration and frequency on subject compliance, and the efficacy of such exercise prescriptions.

  6. 24 CFR 108.25 - Compliance meeting.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Compliance meeting. 108.25 Section... COMPLIANCE PROCEDURES FOR AFFIRMATIVE FAIR HOUSING MARKETING § 108.25 Compliance meeting. (a) Scheduling meeting. If an applicant fails to comply with requirements under § 108.15 or § 108.20 or it appears that...

  7. FDA (Food and Drug Administration) compliance program guidance manual and updates (FY 86). Section 4. Medical and radiological devices. Irregular report

    International Nuclear Information System (INIS)

    1986-01-01

    The FDA Compliance Program Guidance Manual provides a system for issuing and filing program plans and instructions directed to Food and Drug Administration Field operations for project implementation. Section IV provides those chapters of the Compliance Program Guidance Manual which pertain to the areas of medical and radiological devices. Some of the areas of coverage include laser and sunlamp standards inspections, compliance testing of various radiation-emitting products such as television receivers and microwave ovens, emergency response planning and policy, premarket approval and device manufacturers inspections, device problem reporting, sterilization of devices, and consumer education programs on medical and radiological devices

  8. Patient compliance with exercise: different theoretical approaches to short-term and long-term compliance.

    NARCIS (Netherlands)

    Sluijs, E.M.; Knibbe, J.J.

    1991-01-01

    Compliance with exercise regimens is difficult to obtain as is compliance with other medical regimens. In analyzing noncompliance, two problems exist: (I) current theories only partly explain patients’ noncompliance; (2) health care providers seldom act according to the recommendations derived from

  9. Project of neural network for steel grade selection with the assumed CCT diagram

    OpenAIRE

    S. Malara; L.A. Dobrzański; J. Trzaska

    2008-01-01

    Purpose: The aim of this paper was developing a project of neural network for selection of steel grade with the specified CCT diagram – structure and of harness after heat treatment.Design/methodology/approach: The goal has been achieved in the following stages: at the first stage characteristic points of CCT diagram have been determined. At the second stage neural network has been developed and optimized.Findings: The neural network was developed in this paper, that allowed selection of stee...

  10. 75 FR 19179 - Federal Acquisition Regulation; Federal Acquisition Circular 2005-41; Small Entity Compliance Guide

    Science.gov (United States)

    2010-04-13

    ... Acquisition Circular 2005-41; Small Entity Compliance Guide AGENCIES: Department of Defense (DoD), General... Federal Acquisition Circular (FAC) 2005-41 which amends the Federal Acquisition Regulation (FAR... projects where the total cost to the Government is $25 million or more in order to promote economy and...

  11. Cornell University remote sensing program. [selected research projects in land and water resource management

    Science.gov (United States)

    Liang, T.; Belcher, D. J.; Mcnair, A. J.

    1974-01-01

    The major activities of the program staff from December 1, 1973 to May 31, 1974 are reported and include: (1) communication and instruction; (2) data and facilities; (3) research completed; (4) research in progress; (5) selected correspondence; (6) grant sponsored travel; and (7) seminars and newsletters. Detailed information and maps are given for the following selected projects: (1) ERTS mapping of waterways in the Tug Hill region of New York State; (2) photo-archeological investigation of Great Gully, New York; and (3) evaluation of selected highway impacts using aerial photography.

  12. Directory of certificates of compliance for radioactive materials packages. Certificates of compliance

    International Nuclear Information System (INIS)

    1979-10-01

    This volume contains all Certificates of Compliance for radioactive material packages effective September 14, 1979. Purpose of this directory is to make available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance number is included at the back of each volume of the directory

  13. 42 CFR 124.503 - Compliance level.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Compliance level. 124.503 Section 124.503 Public... Unable To Pay § 124.503 Compliance level. (a) Annual compliance level. Subject to the provisions of this... persons unable to pay if it provides for the fiscal year uncompensated services at a level not less than...

  14. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    Energy Technology Data Exchange (ETDEWEB)

    TEDESCHI AR

    2008-08-11

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  15. Selected Examples of LDRD Projects Supporting Test Ban Treaty Verification and Nonproliferation

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Al-Ayat, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Walter, W. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-02-23

    The Laboratory Directed Research and Development (LDRD) Program at the DOE National Laboratories was established to ensure the scientific and technical vitality of these institutions and to enhance the their ability to respond to evolving missions and anticipate national needs. LDRD allows the Laboratory directors to invest a percentage of their total annual budget in cutting-edge research and development projects within their mission areas. We highlight a selected set of LDRD-funded projects, in chronological order, that have helped provide capabilities, people and infrastructure that contributed greatly to our ability to respond to technical challenges in support of test ban treaty verification and nonproliferation.

  16. Draft programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project

    International Nuclear Information System (INIS)

    1994-04-01

    The purpose of the UMTRA Ground Water Project is to protect human health and the environment by meeting the proposed EPA standards in areas where ground water has been contaminated. The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes potential impacts of four programmatic alternatives, including the proposed action. The alternatives do not address site-specific ground water compliance. Rather, the PEIS is a planning document that provides a framework for conducting the Ground Water Project; assesses the potential programmatic impacts of conducting the Ground Water Project; provides a method for determining the site-specific ground water compliance strategies; and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own unique set of potential impacts, could be used to implement all the alternatives except the no action alternative. Implementing a PEIS alternative means applying a ground water compliance strategy or strategies at a specific site. It is the use of a strategy or a combination of strategies that would result in site-specific impacts

  17. Speaking the right language: the scientific method as a framework for a continuous quality improvement program within academic medical research compliance units.

    Science.gov (United States)

    Nolte, Kurt B; Stewart, Douglas M; O'Hair, Kevin C; Gannon, William L; Briggs, Michael S; Barron, A Marie; Pointer, Judy; Larson, Richard S

    2008-10-01

    The authors developed a novel continuous quality improvement (CQI) process for academic biomedical research compliance administration. A challenge in developing a quality improvement program in a nonbusiness environment is that the terminology and processes are often foreign. Rather than training staff in an existing quality improvement process, the authors opted to develop a novel process based on the scientific method--a paradigm familiar to all team members. The CQI process included our research compliance units. Unit leaders identified problems in compliance administration where a resolution would have a positive impact and which could be resolved or improved with current resources. They then generated testable hypotheses about a change to standard practice expected to improve the problem, and they developed methods and metrics to assess the impact of the change. The CQI process was managed in a "peer review" environment. The program included processes to reduce the incidence of infections in animal colonies, decrease research protocol-approval times, improve compliance and protection of animal and human research subjects, and improve research protocol quality. This novel CQI approach is well suited to the needs and the unique processes of research compliance administration. Using the scientific method as the improvement paradigm fostered acceptance of the project by unit leaders and facilitated the development of specific improvement projects. These quality initiatives will allow us to improve support for investigators while ensuring that compliance standards continue to be met. We believe that our CQI process can readily be used in other academically based offices of research.

  18. The influence of corporate governance on project governance

    OpenAIRE

    Gonda, Pavel

    2011-01-01

    This work identifies the interaction between corporate governance and project management in project governance. It begins with introduction of basics of corporate governance and various principles of corporate governance in chosen countries and organizations. Further it introduces theoretical background of project governance and its connection and to corporate governance. In practical part work analyzes the level of compliancy with Swiss codex of best praxis in chosen company. The results con...

  19. 40 CFR 262.90 - Project XL for Public Utilities in New York State.

    Science.gov (United States)

    2010-07-01

    ... compliance history or other appropriate factors. (f) At any time, a Utility may add or remove UCCF... following information: (i) A brief description of the XL project, the intended new use of the facility, and... compliance history or other appropriate factors, the acknowledgment may impose conditions in addition to...

  20. Project control - the next generation

    International Nuclear Information System (INIS)

    Iorii, V.F.; McKinnon, B.L.

    1993-01-01

    The Yucca Mountain Site Characterization Project (YMP) is the U.S. Department of Energy's (DOE) second largest Major System Acquisition Project. We have developed an integrated planning and control system (called PACS) that we believe represents the 'Next Generation' in project control. PACS integrates technical scope, cost, and schedule information for over 50 participating organizations and produces performances measurement reports for science and engineering managers at all levels. Our 'Next Generation' project control too, PACS, has been found to be in compliance with the new DOE Project Control System Guidelines. Additionally, the nuclear utility oversight group of the Edison Electric Institute has suggested PACS be used as a model for other civilian radioactive waste management projects. A 'Next Generation' project control tool will be necessary to do science in the 21st century

  1. MANAGING INNOVATION PROJECTS USING DISTRIBUTION LOGISTICS

    Directory of Open Access Journals (Sweden)

    Erika Loučanová

    2015-12-01

    Full Text Available A significant part of innovation projects management is the distribution logistics. From the point of view of time and material content, the properly chosen way of distribution is one of many factors for success of the project and innovation creation itself. The paper points out the fundamental basis of innovation management in the stage of its realization referring to the importance of distribution logistics in this part of innovation project management. Distribution logistics in the project management provides comprehensive solutions to efficiency of tangible relocating processes in all connections and mutual relations of project in order to maintain compliance between economy and business when implementing innovations.

  2. GENDER AND ETHNICITY DIFFERENCES IN TAX COMPLIANCE

    Directory of Open Access Journals (Sweden)

    Jeyapalan Kasipillai

    2006-01-01

    Full Text Available The purpose of this study is to investigate whether gender and ethnicity differences occur in relation to tax compliance attitude and behavior. Prior studies on tax compliance have focused little on gender as a predictor of compliance. In Malaysia, ethnic background of a taxpayer could be a major determinant of tax compliance. A personal interview approach is used to obtain information from taxpayers in urban towns. A t-test suggests that males and females were found to have similar compliant attitude. As for ethnicity, asimilar result was observed. Results of a regression analysis indicate that gender, academic qualification, and the person preparing tax return were statistically significant as determinants of non-compliant attitude. In terms of compliant behavior, a regression analysis revealed that "attitude towards non-compliance" and "receipt of cash income" were two significant explanatory variables of tax non-compliance behavior of understating income knowingly. The findings of this study are useful for policyimplications in identifying groups that require additional attention to increase voluntary tax compliance.

  3. The role intuitive decision making plays in project selection in the residential property market: a case study of a medium sized

    OpenAIRE

    Ryan, Diarmuid

    2013-01-01

    non-peer-reviewed This thesis addresses the role of intuition in project selection in residential property development. The paper provides a comprehensive review of existing literature in relation to project selection and decision making. In addition, the examination of the project files of M.A. Ryan & Sons Ltd., a medium sized property development company, has enabled a case study to be carried out on three projects carried out by the organisation. Through the case study, t...

  4. Compliance with physical exercise

    DEFF Research Database (Denmark)

    Gram, Anne Sofie; Bønnelycke, Julie; Rosenkilde Larsen, Mads

    2014-01-01

    Aims: Sixty-one healthy, sedentary, moderately overweight young men participated in a randomised controlled trial to examine the effects of two different doses of endurance exercise on health behaviour and exercise compliance. Methods: Participants were randomised to a sedentary control group......), a post hoc thematic analysis was conducted to connect qualitative and quantitative data in a joint analysis. Results: Of the subjects interviewed, exercise compliance expressed as 95% CI was [96.8; 103%] in the MOD group and [82.9; 99.6%] in the HIGH group. The different doses of daily exercise equally...... or quantitative methodology alone. The preconditions of the TBP were fulfilled, and it represents a methodological model to explain the high degree of compliance and motivation to exercise....

  5. Effects of Long Duration Spaceflight on Venous and Arterial Compliance in Astronants

    Science.gov (United States)

    Platts, Steven; Ribeiro, L. Christine

    2014-01-01

    1. Project Overview Visual impairment and intracranial pressure (VIIP) is a spaceflight-associated medical condition affecting at least a third of American astronauts who have flown International Space Station (ISS) missions. VIIP is defined primarily by visual acuity deficits and anatomical changes to eye structures. In some astronauts, eye-related changes do not revert back to the preflight state upon return to Earth. Our team will study some of the possible causes for this syndrome. This will be achieved by reviewing previous astronaut data for factors that may predispose astronauts to higher rates of developing this syndrome or greater severity of symptoms. Additionally, we will conduct 3 separate experiments that will characterize vessels in the head and neck and measure the effects of the experimental conditions on ocular structures and function. 2. Technical Summary The primary objective of this study is to determine whether vascular compliance is altered by spaceflight and whether such adaptations are related to the incidence of the VIIP. In particular, we will measure ocular parameters and vascular compliance in vessels of the head and neck in astronauts who have no spaceflight experience (Ground), in astronauts before, during, and after spaceflight (Flight), and in bed rest subjects with conditions similar to spaceflight (Bed Rest). Additionally, we will analyze astronaut data from the Lifetime Surveillance of Astronaut Health (LSAH) archives to determine which factors might be predictive of the development of VIIP (Data Mining). The project will be conducted in four separate, but related parts. Hypothesis The central hypothesis of this proposal is that exposure to the spaceflight environment aboard the ISS may lead to development of the VIIP syndrome (increased intracranial pressure and impaired visual acuity) and that this may be related to alterations in venous and/or arterial compliance in the head and neck. Specific Aims 1. To determine whether

  6. State regulatory issues in acid rain compliance

    International Nuclear Information System (INIS)

    Solomon, B.D.; Brick, S.

    1992-01-01

    This article discusses the results of a US EPA workshop for state regulators and commission staff on acid rain compliance concerns. The topics of the article include the results of market-based emissions control, how emissions trading is expected to reduce emissions, public utility commissions approval of compliance plans, the purposes of the workshop, market information, accounting issues, regulatory process and utility planning, multi-state compliance planning, and relationship to other compliance issues

  7. Notification: Audit of the U.S. Environmental Protection Agency’s Compliance with the Federal Information Security Management Act

    Science.gov (United States)

    Project #OA-FY14-0135, February 10, 2014. The Office of Inspector General plans to begin fieldwork for an audit of the U.S. Environmental Protection Agency's compliance with the Federal Information Security Management Act (FISMA).

  8. Diagnostic information in compliance checking

    NARCIS (Netherlands)

    Ramezani Taghiabadi, E.; Fahland, D.; Aalst, van der W.M.P.

    2012-01-01

    Compliance checking is gaining importance as today's organizations need to show that operational processes are executed in a controlled manner while satisfying predefined (legal) requirements. Deviations may be costly and expose the organization to severe risks. Compliance checking is of growing

  9. Method ranks competing projects by priorities, risk

    International Nuclear Information System (INIS)

    Moeckel, D.R.

    1993-01-01

    A practical, objective guide for ranking projects based on risk-based priorities has been developed by Sun Pipe Line Co. The deliberately simple system guides decisions on how to allocate scarce company resources because all managers employ the same criteria in weighing potential risks to the company versus benefits. Managers at all levels are continuously having to comply with an ever growing amount of legislative and regulatory requirements while at the same time trying to run their businesses effectively. The system primarily is designed for use as a compliance oversight and tracking process to document, categorize, and follow-up on work concerning various issues or projects. That is, the system consists of an electronic database which is updated periodically, and is used by various levels of management to monitor progress of health, safety, environmental and compliance-related projects. Criteria used in determining a risk factor and assigning a priority also have been adapted and found useful for evaluating other types of projects. The process enables management to better define potential risks and/or loss of benefits that are being accepted when a project is rejected from an immediate work plan or budget. In times of financial austerity, it is extremely important that the right decisions are made at the right time

  10. A MCDM approach for project finance selection: An application in the renewable energy sector

    Directory of Open Access Journals (Sweden)

    García-Bernabeu, Ana

    2015-05-01

    Full Text Available Renewable energy (RE is emerging as a solution in order to replace fossil fuels and become the primary source of energy consumption. Investments in the RE sector involve huge amounts of capital but also many risks. Public sector plays an important role in promoting RE projects but due to the need for reducing public expenditure the private sector becomes essential in financing this type of projects. Project Finance is widely used in RE projects and is especially attractive to the private sector because it can fund major projects off balance sheet. The objective of this paper is to present a decision making tool for helping the private sector on the selection process of RE projects to be funded. The problem could be considered as a multiple criteria decision-making problem where both, financial and non-financial criteria have to be taken into account. Objective aggregation weights for those criteria are obtained using the Moderate Pessimism Decision Making approach and a final ranking of the projects is obtained.

  11. Environmental projects. Volume 5, part 1: Study of subsurface contamination. Part 2: Guide to implement environmental compliance programs

    Science.gov (United States)

    Bengelsdorf, I.

    1988-01-01

    In support of the national goal for the preservation of the environment and the protection of human health and safety, NASA, the Jet Propulsion Laboratory, and the Goldstone Deep Space Communications Complex have adopted the position that their operating installations shall maintain a high level of compliance in regard to regulations concerning environmental hazards. An investigation carried out by Engineering Science, Inc. focused on possible underground contamination that may have resulted from leaks and/or spills from storage facilities at the Goldstone Communications Complex. It also involved the cleanup of a non-hazardous waste dumpsite at the Mojave Base Site at the Goldstone complex. The report also includes details of the management duties and responsibilities needed to maintain compliance with environmental laws and regulations.

  12. Dental students′ compliance with antibiotic prescribing guidelines for dental infections in children

    Directory of Open Access Journals (Sweden)

    Yee Chen Wong

    2016-01-01

    Full Text Available Context: To investigate the antibiotic prescribing training received by dental students, clinical experience in treating child patients, awareness of antibiotic prescribing guidelines, preparedness in antibiotic prescribing, and compliance with antibiotic prescribing guidelines for the management of dental infections in children. Methods: This was a cross-sectional study involving final year dentals students from Malaysian and Asian dental schools. A self-administered questionnaire consisting of five clinical case scenarios was e-mailed to all final year students at selected dental schools. Students′ responses were compared for each clinical case scenario with the prescribing guidelines of the American Academy of Pediatric Dentistry and the American Dental Association. Compliance in each scenario was tested for association with their preparedness in antibiotic prescribing, previous training on antibiotic prescribing and awareness of antibiotic prescribing guidelines using Chi-square test. Data collected were analyzed using SPSS statistics version 20. Results: A total of 108 completed responses were received. About 74 (69% students were from Malaysian dental schools. The compliance rate with prescribing guidelines ranged from 15.7% to 43.5%. Those attending Malaysian dental schools (47.3% and those who had treated child patient more often (46.3% were more likely (P < 0.05 to be aware of the guidelines. Those who had received antibiotic prescribing training (21.3% were more likely to think they were well prepared in antibiotic prescribing (P < 0.05. Conclusions: Final year dental students had low awareness and compliance with antibiotic prescribing guidelines. Further research is needed to investigate how compliance with the guidelines may be enhanced.

  13. Environmental Audit, Weldon Spring Site Remedial Action Project

    International Nuclear Information System (INIS)

    1991-06-01

    This report documents the results of the Environmental Baseline Audit of DOE's Weldon Spring Site Remedial Action Project (WSSRAP), located in St. Charles, Missouri. The purpose of the Environmental Baseline Audit is to provide the Secretary of Energy with concise information pertaining to the following issues: (1) compliance status with applicable environmental regulations (with the exception of National Environmental Policy Act [NEPA] requirements); (2) adherence to best management and accepted industry practices; (3) DOE vulnerabilities and liabilities associated with compliance status, environmental conditions, and management practices; (4) root causes of compliance findings (CF) and best management practice (BMP) findings; (5) adequacy of environmental management programs and organizations; and (6) noteworthy practices. This information will assist DOE in determining patterns and trends in environmental compliance, BMPs, and root causes, and will provide the information necessary for line management to take appropriate corrective actions. 6 figs., 11 tabs

  14. APPLICATION OF AHP METHOD IN THE IDENTIFICATION AND CLASSIFICATION OF PROJECT SELECTION CRITERIA: AN ENERGY SECTOR CASE STUDY

    Directory of Open Access Journals (Sweden)

    Silvério, Adriano Augusto

    2015-07-01

    Full Text Available Choosing from several alternative investment projects in hydropower to build a portfolio of projects is a complex matter. The most commonly used selection model for building the portfolio is the financial method, however it constraints options investments to the economic and financial parameters, which are limiting in nature. Alternatively, this paper proposes the use of multicriterial method Analytic Hierarchy Process – AHP, which incorporates measures to evaluate both quantitative and qualitative data. This method is based on criteria or parameters of operational processes that hinder or facilitate the execution of projects. In order to get the definition of the set of criteria, the Delphi technique was applied to a group of seven experts in managing hydropower projects. Main results show that essential criteria for selection of project investment portfolio, are not limited to financial aspects, but it involves criteria of bureaucratic, organizational, and political environment and technological characters. The conclusion is that the financial potential of hydropower projects are not the only determinants for investments on hydropower projects and, at large, these project are conditioned to other criteria such as, those of bureaucratic and technological nature.

  15. Investigating compliance with SME-friendly procurement policy

    OpenAIRE

    Flynn, Anthony

    2016-01-01

    This study investigates compliance with SME-friendly policy in public procurement. Two research questions guide the investigation. The first is the extent to which policy is being complied with. The results, which are based on 349 public buyer survey responses, reveal compliance to be moderate; indicated by a mean score of 14.54 out of 22 on the compliance index. The second question concerns the impact of institutional forces on policy compliance. A predictive model informed by institutional ...

  16. Coverage and compliance MDA programme for lymphatic filariasis in Bidar district, Karnataka, India

    Directory of Open Access Journals (Sweden)

    Dharukaswami. Mallayya. Koradhanyamath

    2012-08-01

    Full Text Available Objective: To describe the socio demographic characteristics of beneficiaries of the Mass Drug Administration (MDA programme, to assess the coverage, compliance and causes for noncompliance towards MDA in the district, to assess the awareness regarding elephantiasis among beneficiaries and to assess the knowledge of drug distributors towards the filariasis and MDA programme. Methods: This cross sectional study was conducted in 3 rural and 1 urban clusters in Bidar district for the period of 1 week. 50 houses were selected in each cluster by systematic random sampling method and data was collected in a structured proforma by interview technique. Results: Majority of beneficiaries were at the age group of 15-60 years (72.3% and male (53%. The overall coverage of MDA in Bidar district was 62.3%. Compliance among those who had received the tablets was 60.4%. Coverage and compliance was more in rural areas compared to urban. The most common reason quoted for not consuming drugs was fear of adverse effects (72.2% The incidence of adverse events was 0.2%. Even though 75% of them were aware of the disease elephantiasis, only 45.4% had knowledge regarding MDA programme. The knowledge of drug distributors towards MDA and filariasis was found to be adequate. Conclusions: Coverage and compliance towards MDA in Bidar district was poor. The coverage and compliance in rural areas was higher compared to the urban areas.

  17. A Theory of Compliance with Minimum Wage Law

    OpenAIRE

    Asongu Simplice; Jellal Mohamed

    2014-01-01

    Purpose – In this paper, we introduce firm heterogeneity in the context of a model of non-compliance with minimum wage legislation. Design/methodology/approach – Theoretical modeling under government compliance policy and wages & employment under non compliance. Findings – The introduction of heterogeneity in the ease with which firms can be monitored for non compliance allows us to show that non-compliance will persist in sectors which are relatively difficult to monitor, despite the governm...

  18. A Consistent Fuzzy Preference Relations Based ANP Model for R&D Project Selection

    Directory of Open Access Journals (Sweden)

    Chia-Hua Cheng

    2017-08-01

    Full Text Available In today’s rapidly changing economy, technology companies have to make decisions on research and development (R&D projects investment on a routine bases with such decisions having a direct impact on that company’s profitability, sustainability and future growth. Companies seeking profitable opportunities for investment and project selection must consider many factors such as resource limitations and differences in assessment, with consideration of both qualitative and quantitative criteria. Often, differences in perception by the various stakeholders hinder the attainment of a consensus of opinion and coordination efforts. Thus, in this study, a hybrid model is developed for the consideration of the complex criteria taking into account the different opinions of the various stakeholders who often come from different departments within the company and have different opinions about which direction to take. The decision-making trial and evaluation laboratory (DEMATEL approach is used to convert the cause and effect relations representing the criteria into a visual network structure. A consistent fuzzy preference relations based analytic network process (CFPR-ANP method is developed to calculate the preference-weights of the criteria based on the derived network structure. The CFPR-ANP is an improvement over the original analytic network process (ANP method in that it reduces the problem of inconsistency as well as the number of pairwise comparisons. The combined complex proportional assessment (COPRAS-G method is applied with fuzzy grey relations to resolve conflicts arising from differences in information and opinions provided by the different stakeholders about the selection of the most suitable R&D projects. This novel combination approach is then used to assist an international brand-name company to prioritize projects and make project decisions that will maximize returns and ensure sustainability for the company.

  19. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    Science.gov (United States)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  20. Predicting the lung compliance of mechanically ventilated patients via statistical modeling

    International Nuclear Information System (INIS)

    Ganzert, Steven; Kramer, Stefan; Guttmann, Josef

    2012-01-01

    To avoid ventilator associated lung injury (VALI) during mechanical ventilation, the ventilator is adjusted with reference to the volume distensibility or ‘compliance’ of the lung. For lung-protective ventilation, the lung should be inflated at its maximum compliance, i.e. when during inspiration a maximal intrapulmonary volume change is achieved by a minimal change of pressure. To accomplish this, one of the main parameters is the adjusted positive end-expiratory pressure (PEEP). As changing the ventilator settings usually produces an effect on patient's lung mechanics with a considerable time delay, the prediction of the compliance change associated with a planned change of PEEP could assist the physician at the bedside. This study introduces a machine learning approach to predict the nonlinear lung compliance for the individual patient by Gaussian processes, a probabilistic modeling technique. Experiments are based on time series data obtained from patients suffering from acute respiratory distress syndrome (ARDS). With a high hit ratio of up to 93%, the learned models could predict whether an increase/decrease of PEEP would lead to an increase/decrease of the compliance. However, the prediction of the complete pressure–volume relation for an individual patient has to be improved. We conclude that the approach is well suitable for the given problem domain but that an individualized feature selection should be applied for a precise prediction of individual pressure–volume curves. (paper)

  1. [Drug compliance of patients on anticoagulant treatment].

    Science.gov (United States)

    Gadó, Klára; Kocsis, Eszter; Zelkó, Romána; Hankó, Balázs; Kovácsné Balogh, Judit; Forczig, Mónika; Domján, Gyula

    2015-08-09

    Despite several therapeutic possibilities the morbidity and mortality of thromboembolic disorders remain high. Improving drug compliance - i. e. keeping up the doctor's prescriptions - may be an effective tool to reach better results. To improve patients' compliance, the risk factors of non-compliance should be recognized. Among these patients' fear of adverse effects of drugs, their lack of knowledge about their illness and medication, forgetfulness, and other social, economic factors may be the most important. Furthermore, adherence may be worsened when the patient feels that the decision has been made over his/her head. Sustained medical adherence is important because anticoagulation may be a life-long treatment. The new oral anticoagulants make the matter of compliance to be current. These new type of drugs do not need regular laboratory monitoring and, therefore, compliance cannot be strictly followed. There are several studies concerning drug compliance to anticoagulant medications. Improvement of adherence is based on regular patient education after reviewing the factors of non-compliance, which needs teamwork with important roles of doctors, pharmacists, dietetics and nurses. Careful and accurate work of the participants of primary care might be complemented by the activity of anticoagulant clinics.

  2. GENDER AND ETHNICITY DIFFERENCES IN TAX COMPLIANCE

    OpenAIRE

    Jeyapalan Kasipillai; Hijattulah Abdul Jabbar

    2006-01-01

    The purpose of this study is to investigate whether gender and ethnicity differences occur in relation to tax compliance attitude and behavior. Prior studies on tax compliance have focused little on gender as a predictor of compliance. In Malaysia, ethnic background of a taxpayer could be a major determinant of tax compliance. A personal interview approach is used to obtain information from taxpayers in urban towns. A t-test suggests that males and females were found to have similar compliant...

  3. Physicians′ therapeutic practice and compliance of diabetic patients attending rural primary health care units in Alexandria

    Directory of Open Access Journals (Sweden)

    Nahla Khamis R Ibrahim

    2010-01-01

    Full Text Available Objectives: The objectives of the study were to investigate physician′s therapeutic practice and the compliance of diabetic patients attending rural primary health units in Alexandria. Material and Methods: A cross-sectional study was conducted and a multistage stratified random sample method was used for the selection of 600 diabetic patients. Data were collected by means of an interviewing questionnaire, an observation checklist, review of prescriptions and laboratory investigations. A scoring system was made for a diabetic patient′s knowledge and skills, patient′s compliance, doctor-patient relationship, and glycemic control. Results: About 57% always took their medication as prescribed by doctor and on time, only 2.2% always complied with dietary regimen while no one reported regular compliance with exercise regimen. Complications of the regimen was the commonest cause (63.3% of noncompliance. A highly statistically significant difference was found between compliance with all regimens and patient′s knowledge of diabetes. The scores for doctor-patient relationship were all unsatisfactory. Results of glycosylated hemoglobin (HbA1c revealed that metabolic control of four-fifth of the patients was satisfactory, 12% had fair and 8% had poor metabolic control. Conclusions: Patient′s compliance with most of the diabetes regimen was low. Doctor-patient relationship and patient′s compliance should be improved by conducting educational and training programs.

  4. Increasing compliance with the World Health Organization Surgical Safety Checklist-A regional health system's experience.

    Science.gov (United States)

    Gitelis, Matthew E; Kaczynski, Adelaide; Shear, Torin; Deshur, Mark; Beig, Mohammad; Sefa, Meredith; Silverstein, Jonathan; Ujiki, Michael

    2017-07-01

    In 2009, NorthShore University HealthSystem adapted the World Health Organization Surgical Safety Checklist (SSC) at each of its 4 hospitals. Despite evidence that SSC reduces intraoperative mistakes and increase patient safety, compliance was found to be low with the paper form. In November 2013, NorthShore integrated the SSC into the electronic health record (EHR). The aim was to increase communication between operating room (OR) personnel and to encourage best practices during the natural workflow of surgeons, anesthesiologists, and nurses. The purpose of this study was to examine the impact of an electronic SSC on compliance and patient safety. An anonymous OR observer selected cases at random and evaluated the compliance rate before the rollout of the electronic SSC. In June 2014, an electronic audit was performed to assess the compliance rate. Random OR observations were also performed throughout the summer in 2014. Perioperative risk events, such as consent issues, incorrect counts, wrong site, and wrong procedure were compared before and after the electronic SSC rollout. A perception survey was also administered to NorthShore OR personnel. Compliance increased from 48% (n = 167) to 92% (n = 1,037; P World Health Organization SSC is a validated tool to increase patient safety and reduce intraoperative complications. The electronic SSC has demonstrated an increased compliance rate, a reduced number of risk events, and most OR personnel believe it will have a positive impact on patient safety. Copyright © 2016 Elsevier Inc. All rights reserved.

  5. Type B Package Radioactive Material Contents Compliance

    International Nuclear Information System (INIS)

    HENSEL, STEVE

    2006-01-01

    Implementation of packaging and transportation requirements can be subdivided into three categories; contents compliance, packaging closure, and transportation or logistical compliance. This paper addresses the area of contents compliance within the context of regulations, DOE Orders, and appropriate standards. Common practices and current pitfalls are also discussed

  6. Selecting the Most Economic Project under Uncertainty Using Bootstrap Technique and Fuzzy Simulation

    Directory of Open Access Journals (Sweden)

    Kamran Shahanaghi

    2012-01-01

    Full Text Available This article, by leaving pre-determined membership function of a fuzzy set which is a basic assumption for such subject, will try to propose a hybrid technique to select the most economic project among alternative projects in fuzziness interest rates condition. In this way, net present worth (NPW would be the economic indicator. This article tries to challenge the assumption of large sample sizes availability for membership function determination and shows that some other techniques may have less accuracy. To give a robust solution, bootstrapping and fuzzy simulation is suggested and a numerical example is given and analyzed.

  7. Idaho CERCLA Disposal Facility Complex Compliance Demonstration for DOE Order 435.1

    Energy Technology Data Exchange (ETDEWEB)

    J. Simonds

    2006-09-01

    This compliance demonstration document provides an analysis of the Idaho CERCLA Disposal Facility (ICDF) Complex compliance with DOE Order 435.1. The ICDF Complex includes the disposal facility (landfill), evaporation pond, admin facility, weigh scale, decon building, treatment systems, and various staging/storage areas. These facilities were designed and are being constructed to be compliant with DOE Order 435.1, Resource Conservation and Recovery Act Subtitle C, and Toxic Substances Control Act polychlorinated biphenyl design and construction standards. The ICDF Complex is designated as the central Idaho National Laboratory (INL) facilityyy for the receipt, staging/storage, treatment, and disposal of INL Comprehensive Environmental Response, Compensation and Liability Act (CERCLA) waste streams. This compliance demonstration document discusses the conceptual site model for the ICDF Complex area. Within this conceptual site model, the selection of the area for the ICDF Complex is discussed. Also, the subsurface stratigraphy in the ICDF Complex area is discussed along with the existing contamination beneath the ICDF Complex area. The designs for the various ICDF Complex facilities are also included in this compliance demonstration document. These design discussions are a summary of the design as presented in the Remedial Design/Construction Work Plans for the ICDF landfill and evaporation pond and the Staging, Storage, Sizing, and Treatment Facility. Each of the major facilities or systems is described including the design criteria.

  8. Impacts and Compliance Implementation Plans and Required Deviations for Toxic Substance Control Act (TSCA) Regulation of Double Shell Tanks (DST)

    International Nuclear Information System (INIS)

    MULKEY, C.H.

    2000-01-01

    In May 2000, the U.S. Department of Energy, Office of River Protection (DOE-ORP) and the U.S. Environmental Protection Agency (EPA) held meetings regarding the management of polychlorinated biphenyls (PCBs) in the Hanford tank waste. It was decided that the radioactive waste currently stored in the double-shell tanks (DSTs) contain waste which will become subject to the Toxic Substance Control Act (TSCA) (40 CFR 761). As a result, DOE-ORP directed the River Protection Project tank farm contractor (TFC) to prepare plans for managing the PCB inventory in the DSTs. Two components of the PCB management plans are this assessment of the operational impacts of TSCA regulation and the identifications of deviations from TSCA that are required to accommodate tank farm unique limitations. This plan provides ORP and CH2M HILL Hanford Group, Inc. (CHG) with an outline of TSCA PCB requirements and their applicability to tank farm activities, and recommends a compliance/implementation approach. Where strict compliance is not possible, the need for deviations from TSCA PCB requirements is identified. The purpose of assembling this information is to enhance the understanding of PCB management requirements, identify operational impacts and select impact mitigation strategies. This information should be useful in developing formal agreements with EPA where required

  9. REDUCING COSTS OF TAX COMPLIANCE AND INVESTMENTS IN PUBLIC SYSTEM OF DIGITAL BOOKKEEPING – SPED – IN BRAZIL

    Directory of Open Access Journals (Sweden)

    Edson Sampaio de Lima

    2016-04-01

    Full Text Available The Public System of Digital Bookkeeping – SPED was developed with the intention of further integration between the tax administrations themselves, then between them and the taxpayers, through the use of technology and, consequently, socioeconomic data standard, in a single environment, raising the tax collection efficiency and reducing the costs of administration and compliance. This article intends to contribute to the analysis of public investments directed to the establishment and maintenance of the project, effectively resulted in a reduction in the costs of tax compliance, temporary and permanent. Survey method was used as a non-random mechanism for data collection, with a developed questionnaire containing 22 questions based on the prediction model regulatory impact developed and applied by the Australian Taxation Office – ATO in your country, adapted to identify cost reduction compliance related to three specific organizational aspects: People, Technology and Procurement of Consulting Services. The questionnaire was emailed to 20 people with executive position or managers directly involved in the project in SPED size businesses and distinct segment. Responded to the survey 20 of the 20 companies. The data collected were analyzed through descriptive and exploratory, in the latter case using the cluster analysis. The survey approach has met both the qualitative and the quantitative research. The results indicate that the SPED caused an increase in compliance costs temporary and permanent, mainly due to the implementation strategy defined and applied solely by the public administration. The analysis also allowed evidence that even if public investments directed to the implementation and maintenance of SPED are not comparatively similar to private investments directed to the same end, it shows a tendency to shift costs of administration for compliance costs for taxpayers.

  10. Mobile Source Emissions Regulatory Compliance Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Engine and Vehicle Compliance Certification and Fuel Economy Inventory contains measured emissions and fuel economy compliance information for all types of...

  11. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    None

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts.

  12. Final programmatic environmental impact statement for the Uranium Mill Tailings Remedial Action Ground Water Project. Volume 1

    International Nuclear Information System (INIS)

    1996-04-01

    The first step in the UMTRA Ground Water Project is the preparation of this programmatic environmental impact statement (PEIS). This document analyzes the potential impacts of four alternatives for conducting the Ground Water Project. One of these alternatives is the proposed action. These alternatives do not address site-specific ground water compliance strategies because the PEIS is a planning document only. It assesses the potential programmatic impacts of conducting the Ground Water Project, provides a method for determining the site-specific ground water compliance strategies, and provides data and information that can be used to prepare site-specific environmental impacts analyses more efficiently. This PEIS differs substantially from a site-specific environmental impact statement because multiple ground water compliance strategies, each with its own set of potential impacts, could be used to implement all the alternatives except the no action alternative. In a traditional environmental impact statement, an impacts analysis leads directly to the defined alternatives. The impacts analysis for implementing alternatives in this PEIS first involves evaluating a ground water compliance strategy or strategies, the use of which will result in site-specific impacts. This PEIS impacts analysis assesses only the potential impacts of the various ground water compliance strategies, then relates them to the alternatives to provide a comparison of impacts

  13. QA lessons learned for parameter control from the WIPP Project

    International Nuclear Information System (INIS)

    Richards, R.R.

    1998-01-01

    This paper provides a summary of lessons learned from experiences on the Waste Isolation Pilot Plant (WJPP) Project in implementation of quality assurance controls surrounding inputs for performance assessment analysis. Since the performance assessment (PA) process is inherent in compliance determination for any waste repository, these lessons-learned are intended to be useful to investigators, analysts, and Quality Assurance (QA) practitioners working on high level waste disposal projects. On the WIPP Project, PA analyses for regulatory-compliance determination utilized several inter-related computer programs (codes) that mathematically modeled phenomena such as radionuclide release, retardation, and transport. The input information for those codes are the parameters that are the subject of this paper. Parameters were maintained in a computer database, which was then queried electronically by the PA codes whenever input was needed as the analyses were run

  14. Software for improving the quality of project management, a case study: international manufacture of electrical equipment

    Science.gov (United States)

    Preradović, D. M.; Mićić, Lj S.; Barz, C.

    2017-05-01

    Production conditions in today’s world require software support at every stage of production and development of new products, for quality assurance and compliance with ISO standards. In addition to ISO standards such as usual metrics of quality, companies today are focused on other optional standards, such as CMMI (Capability Maturity Model Integrated) or prescribing they own standards. However, while there is intensive progress being made in the PM (project management), there is still a significant number of projects, at the global level, that are failures. These have failed to achieve their goals, within budget or timeframe. This paper focuses on checking the role of software tools through the rate of success in projects implemented in the case of internationally manufactured electrical equipment. The results of this research show the level of contribution of the project management software used to manage and develop new products to improve PM processes and PM functions, and how selection of the software tools affects the quality of PM processes and successfully completed projects.

  15. Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-06-01

    Full Text Available Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM as analytical hierarchy process (AHP have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.

  16. Compliance as factor for prevent complications of using of contact lenses

    Directory of Open Access Journals (Sweden)

    E. Y. Markova

    2015-01-01

    Full Text Available The main goal of this study is to identify the role of compliance in the prevention of complications while wearing soft contact lenses (SCL. 2257 patients in the «Center of vision correction contact» were examined. The age of patients was from12 till 46 years. 58 % female, 42 % male. 47.5 % patients were using daily disposable lenses, 52.5 % — lenses of planned replacement: 23.4 % — 2 weeks, 25.1 % — 1 month, 4 % — 3 months. All patients were using SCL for at least 1 year. The benefits of contact lens are compared with the glasses by different authors. However, any contact lens are a foreign body for the eye, which requires special care, and in case of non-compliance with the doctor’s recommendations may cause the complications. This study has shown that compliance among patients using contact lenses is below 50 %. The main reason for noncompliance of patients is the lack of time and attention to the health of patients. For achievement of compliance and prevention of complications of contact lens is recommended to regularly take the following necessary measures: patient education, explaining to him the need for each stage of lens care, which increases motivation. At the same time, the learning process can be demonstrated to have complications arise in the case of disturbances. Optimization of individual therapeutic program, which is the correct selection of contact lenses and care products tailored to the individual needs of the patient, his lifestyle and personal finance. However, the risk of complications depends not only on the doctor or the manufacturer, but to a greater extent on the patient. In other words, compliance — a necessary condition for ensuring the effectiveness of contact lens and avoiding the occurrence of complications.

  17. Multi-period project portfolio selection under risk considerations and stochastic income

    Science.gov (United States)

    Tofighian, Ali Asghar; Moezzi, Hamid; Khakzar Barfuei, Morteza; Shafiee, Mahmood

    2018-02-01

    This paper deals with multi-period project portfolio selection problem. In this problem, the available budget is invested on the best portfolio of projects in each period such that the net profit is maximized. We also consider more realistic assumptions to cover wider range of applications than those reported in previous studies. A novel mathematical model is presented to solve the problem, considering risks, stochastic incomes, and possibility of investing extra budget in each time period. Due to the complexity of the problem, an effective meta-heuristic method hybridized with a local search procedure is presented to solve the problem. The algorithm is based on genetic algorithm (GA), which is a prominent method to solve this type of problems. The GA is enhanced by a new solution representation and well selected operators. It also is hybridized with a local search mechanism to gain better solution in shorter time. The performance of the proposed algorithm is then compared with well-known algorithms, like basic genetic algorithm (GA), particle swarm optimization (PSO), and electromagnetism-like algorithm (EM-like) by means of some prominent indicators. The computation results show the superiority of the proposed algorithm in terms of accuracy, robustness and computation time. At last, the proposed algorithm is wisely combined with PSO to improve the computing time considerably.

  18. Relationship of Personal- Social and Therapeutic Factors with Medication Compliance in TB Patients in Ahwaz

    Directory of Open Access Journals (Sweden)

    S Jahani

    2012-01-01

    Full Text Available Introduction: Despite the implementation of DOTS strategy, TB remains one of the ten leading causes of death in developing countries. Compliance with treatment is affected by social, cultural, and economic factors, and patients’ knowledge and attitude as well. The aim of this study was to determine the relationship between compliance with treatment and personal, social and therapeutic factors in TB patients in Ahwaz. Methods: This cross-sectional descriptive study was conducted on 167 TB patients. Subjects were selected based on target. The data were collected using a questionnaire, and by observation, sputum analysis, and Kvzart Ponce urine test. The validity of the questionnaire was tested by the method of content validity, and its internal consistency and reliability was tested by Cronbach's alpha coefficient. Data analyzed by SpSS. Results: Among all subjects, 52.7% of patients showed complete compliance and 35.2% and 12% of them showed partial and poor compliance, respectively. There was a significant relationship between treatment compliance and gender(p=0.009, quality of monthly income(p=0.007, and addiction(p=0.001. The quality of treatment compliance was not significantly related to age, marital status, educational level, ethnicity, and medical complications. Conclusion: The findings showed that Incomplete treatment of TB is much worse than not treating it, because the lack of precision in the administration and consumption of anti-tuberculosis drugs, leads to the emergence of resistant TB. Paying attention to the factors decreasing treatment compliance and trying to eliminate them may lead to better treatment and lower incidence and prevalence of tuberculosis in the community.

  19. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry.

    Science.gov (United States)

    Ortíz, Miguel A; Felizzola, Heriberto A; Nieto Isaza, Santiago

    2015-01-01

    The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also

  20. Year 2000 compliance issues.

    Science.gov (United States)

    1999-03-01

    This month, we continue our coverage of the year 2000 (Y2K) problem as it affects healthcare facilities and the professionals who work in them. We present the following articles: "Checking PCs for Y2K Compliance"--In this article, we describe the probable sources of Y2K-related errors in PCs and present simple procedures for testing the Y2K compliance of PCs and application software. "Y2K Assessment Equipment Expectations"--In this article, we review the Y2K compliance data from a small sampling of hospitals to help answer the question "What percentage of medical equipment will likely be susceptible to Y2K problems?" "Y2K Labeling of Medical Devices"--In this article, we discuss the pros and cons of instituting a program to label each medical device with its Y2K status. Also in this section, we present an updated list of organizations that support ECRI's Position Statement on the testing of medical devices for Y2K compliance, which we published in the December 1998 issue of Health Devices (27[12]). And we remind readers of the services ECRI can offer to help healthcare institutions cope with the Y2K problem.

  1. Effects of Maternal Childhood Aggression and Social Withdrawal on Maternal Request Strategies and Child Compliance and Noncompliance

    Science.gov (United States)

    Grunzeweig, Naomi; Stack, Dale M.; Serbin, Lisa A.; Ledingham, Jane; Schwartzman, Alex E.

    2009-01-01

    This prospective, intergenerational study investigated the influences of maternal histories of childhood aggression and social withdrawal on maternal request strategies and child compliance and noncompliance. Seventy-four women from the Concordia Longitudinal Risk Project, who were rated during childhood using peer nomination measures of…

  2. [Quality and compliance with Clinical Practice Guidelines of Chronic Noncommunicable Diseases in primary care].

    Science.gov (United States)

    Poblano-Verástegui, Ofelia; Vieyra-Romero, Waldo I; Galván-García, Ángel F; Fernández-Elorriaga, María; Rodríguez-Martínez, Antonia I; Saturno-Hernández, Pedro J

    2017-01-01

    To assess the quality and compliance of clinical practice guidelines (CPG) applicable to chronic non-communicable diseases (CNCD) in primary healthcare (CS), and views of staff on the barriers, facilitators and their use. 18 valued CPG with AGREEII, 3 are selected to develop indicators and assess compliance using lot quality acceptance sample (LQAS, standard 75 / 95% threshold 40 / 75% respectively, α:0. 05, β:0. 10) on 5 CS. 70 professionals surveyed about knowledge and use of CPG. Average quality of the CPG was 57.2%; low rating in domains: "Applicability" (<25%), "Stakeholder involvement" (43.5%) and "Rigour of development" (55.0%). Compliance in CS ranges from 39 to 53.4%. Professionals show uneven knowledge of CPG; 44 to 45% (according to CPG), they declare that they are not used, they identify as main barriers the lack of training, and their difficult accessibility and management. The quality and implementation of evaluated CPG is deficient constituting an opportunity of improvement in health services.

  3. Improving admission medication reconciliation compliance using the electronic tool in admitted medical patients

    Science.gov (United States)

    Taha, Haytham; abdulhay, dana; Luqman, Neama; Ellahham, Samer

    2016-01-01

    Sheikh Khalifa Medical City (SKMC) in Abu Dhabi is the main tertiary care referral hospital in the United Arab Emirates (UAE) with 560 bed capacity that is fully occupied most of the time. SKMC senior management has made a commitment to make quality and patient safety a top priority. Our governing body Abu Dhabi Health Services Company has identified medication reconciliation as a critical patient safety measure and key performance indicator (KPI). The medication reconciliation electronic form a computerized decision support tool was introduced to improve medication reconciliation compliance on transition of care at admission, transfer and discharge of patients both in the inpatient and outpatient settings. In order to improve medication reconciliation compliance a multidisciplinary task force team was formed and led this quality improvement project. The purpose of this publication is to indicate the quality improvement interventions implemented to enhance compliance with admission medication reconciliation and the outcomes of those interventions. We chose to conduct the pilot study in general medicine as it is the busiest department in the hospital, with an average of 390 patients admitted per month during the study period. The study period was from April 2014 till October 2015 and a total of 8576 patients were evaluated. The lessons learned were disseminated throughout the hospital. Our aim was to improve admission medication reconciliation compliance using the electronic form in order to ensure patient safety and reduce preventable harm in terms of medication errors. Admission medication reconciliation compliance improved in general medicine from 40% to above 85%, and this improvement was sustained for the last four months of the study period. PMID:27822371

  4. 40 CFR 73.35 - Compliance.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 16 2010-07-01 2010-07-01 false Compliance. 73.35 Section 73.35... ALLOWANCE SYSTEM Allowance Tracking System § 73.35 Compliance. (a) Allowance transfer deadline. No allowance... in § 73.34(a) of this part, the Administrator will deduct allowances for each source with excess...

  5. The creep compliance, the relaxation modulus and the complex compliance of linear viscoelastic, homogeneous, isotropic materials

    International Nuclear Information System (INIS)

    Wong, P.K.

    1989-01-01

    This paper reports on a study to obtain the creep compliance, the relaxation modulus and the complex compliance derived from the concept of mechanical resistance for the constitutive equation of a class of linear viscoelastic, homogeneous, isotropic materials

  6. Compliance of feed limits, does not mean compliance of food limits

    Directory of Open Access Journals (Sweden)

    van Raamsdonk LWD.

    2009-01-01

    Full Text Available The carry-over of contaminants from feed to animal food products is an important aspect of the animal production chain. For a proper containment, limits for feed as well food products are fixed for a series of chemicals, e.g. dioxins and dioxin-like PCBs, lead, cadmium, some chlorinated pesticides, and aflatoxin B1 (and its metabolite M1 in milk. The relationship between feed and food limits is an important issue. An ideal goal is to assure that compliance to a feed limits automatically results in compliance to food limits. In order to collect information about this relationship, several simulation models and a large database on transfer factors have been developed. An optimal choice between either a model or an application of data from the Transfer Database is based on both the knowledge level, and on the circumstances of the specific situation. To reach and validate such an optimal choice an Expert System Carry-Over is currently in development, containing four different modules: 1 the different calculation models and the Transfer Database, 2 a decision tree for choosing the optimal strategy, 3 data tables indicating knowledge levels of compound/animal/product parameters, and 4 supporting databases containing information on consumption and composition of daily diets, animal parameters, and amounts of (daily production. Calculations indicate that for dioxins compliance to feed levels does not necessarily mean that food limits are complied as well. Besides an estimation of the compliance to limits, the expert system is a tool for feed related risk assessments, and for planning of future research.

  7. Monitoring compliance with requirements during site characterization

    International Nuclear Information System (INIS)

    Herrington, C.C.; Jennetta, A.R.; Dobson, D.C.

    1991-01-01

    The question of when a program of Regulatory Compliance should be applied and what it should be applied to, when the subject of compliance is a High Level Radioactive Waste Repository, defies resolution by merely relating to past practices of licensees of the US Nuclear Regulatory Commission (NRC). NRC regulations governing the disposal of High Level Waste include interactions with the potential applicant (US DOE) during the pre-license application phase of the program when the basis for regulatory compliance is not well defined. To offset this shortcoming, the DOE will establish an expanded basis for regulatory compliance, keeping the NRC apprised of the basis as it develops. As a result, the preapplication activities of DOE will assume the added benefit of qualification to a suitable Regulatory Compliance monitoring and maintenance plan

  8. Understanding and managing compliance in the nature conservation context.

    Science.gov (United States)

    Arias, Adrian

    2015-04-15

    Nature conservation relies largely on peoples' rule adherence. However, noncompliance in the conservation context is common: it is one of the largest illegal activities in the world, degrading societies, economies and the environment. Understanding and managing compliance is key for ensuring effective conservation, nevertheless crucial concepts and tools are scattered in a wide array of literature. Here I review and integrate these concepts and tools in an effort to guide compliance management in the conservation context. First, I address the understanding of compliance by breaking it down into five key questions: who?, what?, when?, where? and why?. A special focus is given to 'why?' because the answer to this question explains the reasons for compliance and noncompliance, providing critical information for management interventions. Second, I review compliance management strategies, from voluntary compliance to coerced compliance. Finally, I suggest a system, initially proposed for tax compliance, to balance these multiple compliance management strategies. This paper differs from others by providing a broad yet practical scope on theory and tools for understanding and managing compliance in the nature conservation context. Copyright © 2015 Elsevier Ltd. All rights reserved.

  9. ICF's Plant Compliance Assessment System

    International Nuclear Information System (INIS)

    Baker, S.M.

    1989-01-01

    Government and private industrial facilities must manage wastes that are both radioactive and (chemically) hazardous. Until recently, these mixed wastes have been managed under rules established under the Atomic Energy Act (AEA) and the Low-Level Waste Policy At, and rules that derive from environmental legislation have not been applied. Both sets of rules now apply to mixed wastes, creating situations in which significant changes to waste steams must be made in order to bring them into compliance with environmental regulations. The first step in bringing waste streams into compliance is to determine their status with respect to the newly-applicable regulations. This process of compliance assessment is difficult because requirements to minimize human exposure to radiation can conflict with requirements of environmental regulations, many regulations are potentially applicable, the regulations are changing rapidly, and because waste streams designed to operate under AEA rules frequently cannot be easily modified to incorporate the additional regulations. Modern personal computer (PC) tools are being developed to help regulatory analysts manage the large amounts of information required to asses the compliance status of complex process plants. This paper presents the Plant Compliance Assessment System (PCAS), which performs this function by relating a database containing references to regulatory requirements to databases created to describe relevant aspects of the facility to be assessed

  10. Compliance with referral of sick children: a survey in five districts of Afghanistan

    Directory of Open Access Journals (Sweden)

    Newbrander William

    2012-04-01

    Full Text Available Abstract Background Recognition and referral of sick children to a facility where they can obtain appropriate treatment is critical for helping reduce child mortality. A well-functioning referral system and compliance by caretakers with referrals are essential. This paper examines referral patterns for sick children, and factors that influence caretakers’ compliance with referral of sick children to higher-level health facilities in Afghanistan. Methods The study was conducted in 5 rural districts of 5 Afghan provinces using interviews with parents or caretakers in 492 randomly selected households with a child from 0 to 2 years old who had been sick within the previous 2 weeks with diarrhea, acute respiratory infection (ARI, or fever. Data collectors from local nongovernmental organizations used a questionnaire to assess compliance with a referral recommendation and identify barriers to compliance. Results The number of referrals, 99 out of 492 cases, was reasonable. We found a high number of referrals by community health workers (CHWs, especially for ARI. Caretakers were more likely to comply with referral recommendations from community members (relative, friend, CHW, traditional healer than with recommendations from health workers (at public clinics and hospitals or private clinics and pharmacies. Distance and transportation costs did not create barriers for most families of referred sick children. Although the average cost of transportation in a subsample of 75 cases was relatively high (US$11.28, most families (63% who went to the referral site walked and hence paid nothing. Most caretakers (75% complied with referral advice. Use of referral slips by health care providers was higher for urgent referrals, and receiving a referral slip significantly increased caretakers’ compliance with referral. Conclusions Use of referral slips is important to increase compliance with referral recommendations in rural Afghanistan.

  11. Compliance with referral of sick children: a survey in five districts of Afghanistan.

    Science.gov (United States)

    Newbrander, William; Ickx, Paul; Werner, Robert; Mujadidi, Farooq

    2012-04-27

    Recognition and referral of sick children to a facility where they can obtain appropriate treatment is critical for helping reduce child mortality. A well-functioning referral system and compliance by caretakers with referrals are essential. This paper examines referral patterns for sick children, and factors that influence caretakers' compliance with referral of sick children to higher-level health facilities in Afghanistan. The study was conducted in 5 rural districts of 5 Afghan provinces using interviews with parents or caretakers in 492 randomly selected households with a child from 0 to 2 years old who had been sick within the previous 2 weeks with diarrhea, acute respiratory infection (ARI), or fever. Data collectors from local nongovernmental organizations used a questionnaire to assess compliance with a referral recommendation and identify barriers to compliance. The number of referrals, 99 out of 492 cases, was reasonable. We found a high number of referrals by community health workers (CHWs), especially for ARI. Caretakers were more likely to comply with referral recommendations from community members (relative, friend, CHW, traditional healer) than with recommendations from health workers (at public clinics and hospitals or private clinics and pharmacies). Distance and transportation costs did not create barriers for most families of referred sick children. Although the average cost of transportation in a subsample of 75 cases was relatively high (US$11.28), most families (63%) who went to the referral site walked and hence paid nothing. Most caretakers (75%) complied with referral advice. Use of referral slips by health care providers was higher for urgent referrals, and receiving a referral slip significantly increased caretakers' compliance with referral. Use of referral slips is important to increase compliance with referral recommendations in rural Afghanistan.

  12. Compliance with RSV prophylaxis: Global physicians’ perspectives

    Directory of Open Access Journals (Sweden)

    Kari S Anderson

    2009-07-01

    Full Text Available Kari S Anderson, Victoria M Mullally, Linda M Fredrick, Andrew L CampbellAbbott Laboratories, Abbott Park, IL, USAAbstract: Respiratory syncytial virus (RSV is a significant cause of morbidity in high-risk infants. Palivizumab is proven to prevent serious RSV disease, but compliance with prophylaxis (monthly doses during the RSV season is essential to ensure protection. We invited 453 pediatricians to participate in a survey to identify their perspectives of barriers to compliance and interventions to improve compliance with palivizumab prophylaxis schedules. One hundred physicians from five continents completed the survey, identifying caregiver inconvenience, distance to clinic, cost of prophylaxis, and lack of understanding of the severity of RSV as the most common reasons for noncompliance. They recommended provision of educational materials about RSV, reminders from hospital or clinic, and administration of prophylaxis at home to increase compliance. Globally, physicians recognize several obstacles to prophylaxis compliance. This survey suggests that focused proactive interventions such as empowering caregivers with educational materials and reducing caregiver inconvenience may be instrumental to increase compliance.Keywords: medication adherence, respiratory syncytial virus infections, infant, premature, immunization, passive

  13. Performance assessment in support of compliance certification application for the WIPP project

    International Nuclear Information System (INIS)

    Jow, H.N.; Anderson, D.R.; Marietta, M.; Helton, J.; Basabilvazo, G.

    1998-03-01

    The Waste Isolation Pilot Plant (WIPP) is being developed by the US Department of Energy for the geologic (deep underground) disposal of transuranic (TRU) waste. A Compliance Certification Application (CCA) of the WIPP (1) for such disposal was submitted to the US Environmental Protection Agency (EPA) in October, 1996, and is currently under review, with a decision anticipated in late 1997. An important component of the CCA is a performance assessment (PA) for the WIPP carried out by Sandia National Laboratories. The final outcome of the PA is a complementary cumulative distribution function (CCDF) for radionuclide releases from the WIPP to the accessible environment and an assessment of the confidence with which this CCDF can be estimated. This paper describes the computational process used to develop the CCDF. The results of uncertainty and sensitivity analysis are also presented

  14. Assessment of compliance costs resulting from implementation of the proposed Great Lakes water quality guidance

    International Nuclear Information System (INIS)

    Fenner, K.; Podar, M.; Snyder, B.

    1993-01-01

    The primary purpose of the study was to develop an estimate of the incremental cost to direct dischargers resulting from the implementation of the proposed Great Lakes Water Quality Guidance (GLWQG). This estimate reflects the incremental cost of complying with permit requirements developed using the Implementation Procedures and water quality criteria proposed in the GLWQG versus permit requirements based on existing State water quality standards. Two secondary analyses were also performed, one to develop a preliminary estimate of the costs that would be incurred by indirect dischargers to publicly owned treatment works (POTWs), and another to evaluate the cost-effectiveness of the GLWQG. Finally, several sensitivity analyses were performed to evaluate the impact of several major assumptions on the estimated compliance costs. To estimate compliance costs, permit limitations and conditions based on existing State water quality standards were compared to water quality-based limitations and conditions based on the proposed GLWQG criteria and Implementation Procedures for a sample of plants. The control measures needed to comply with the proposed GLWQG-based effluent limitations were evaluated. Individual plant compliance costs were estimated for these control measures based on information on treatment technology and cost analyses available in the literature. An overall compliance cost was projected from the sample based on statistical methods

  15. 7 CFR 772.3 - Compliance.

    Science.gov (United States)

    2010-01-01

    ... SPECIAL PROGRAMS SERVICING MINOR PROGRAM LOANS § 772.3 Compliance. (a) Requirements. No Minor Program... parts 15d and 15e. (b) Reviews. In accordance with Title VI of the Civil Rights Act of 1964, the Agency will conduct a compliance review of all Minor Program borrowers, to determine if a borrower has...

  16. Estimation of the compliance of the human capacitance vessels using radionuclide plethysmography. Comparison of the compliance with the NYHA functional classification

    Energy Technology Data Exchange (ETDEWEB)

    Takatsu, Hisato; Gotoh, Kohshi; Suzuki, Takahiko and others

    1988-01-01

    Radionuclide (RN) plethysmography with Tc-99m RBC was performed in 32 patients with heart disease with the purpose of obtaining compliance of human capacitance vessels. When equilibrium was achieved, RN counts of the region of interest and venous pressure in the forearm were sequentially recorded when the vein of the upper arm was occluded with a cuff inflator. Based on the RN count-venous pressure curve, the specific compliance of the forearm vein and compliance of systemic venous system (SVS) were estimated. In the group of the NYHA functional classification I, which is recognized as hemodynamically ''normal'', the compliance of SVS was 129.8 +- 25.9 ml center dot mmHg/sup -1/ (mean +- SD; n = 9). In comparing the NYHA functional classification and the compliance of SVS, the compliance of SVS was significantly decreased for severer heart failure. Tongue administration of nitroglycerin (0.6 mg) significantly increased the compliance of SVS (p < 0.01). (Namekawa, K.).

  17. Directory of certificates of compliance for radioactive materials packages: Certificates of compliance

    International Nuclear Information System (INIS)

    1987-11-01

    This directory contains a Summary Report of the US Nuclear Regulatory Commission's Certificates of Compliance (Volume 2) for Radioactive Material Packages effective October 1, 1987. This directory makes available a convenient source of information on packagings which have been approved by the US Nuclear Regulatory Commission. To assist in identifying packaging, an index by Model Number and corresponding Certificate of Compliance Number is included at the back of Volume 2 of the directory. A listing by packaging types is included in the back of Volume 2

  18. Compliance with occlusion therapy for childhood amblyopia.

    Science.gov (United States)

    Wallace, Michael P; Stewart, Catherine E; Moseley, Merrick J; Stephens, David A; Fielder, Alistair R

    2013-09-17

    Explore compliance with occlusion treatment of amblyopia in the Monitored and Randomized Occlusion Treatment of Amblyopia Studies (MOTAS and ROTAS), using objective monitoring. Both studies had a three-phase protocol: initial assessment, refractive adaptation, and occlusion. In the occlusion phase, participants were instructed to dose for 6 hours/day (MOTAS) or randomized to 6 or 12 hour/day (ROTAS). Dose was monitored continuously using an occlusion dose monitor (ODM). One hundred and fifty-two patients (71 male, 81 female; 122 Caucasian, 30 non-Caucasian) of mean ± SD age 68 ± 18 months participated. Amblyopia was defined as an interocular acuity difference of at least 0.1 logMAR and was associated with anisometropia in 50, strabismus in 44, and both (mixed) in 58. Median duration of occlusion was 99 days (interquartile range 72 days). Mean compliance was 44%, mean proportion of days with no patch worn was 42%. Compliance was lower (39%) on weekends compared with weekdays (46%, P = 0.04), as was the likelihood of dosing at all (52% vs. 60%, P = 0.028). Compliance was lower when attendance was less frequent (P amblyopia type, and severity were not associated with compliance. Mixture modeling suggested three subpopulations of patch day doses: less than 30 minutes; doses that achieve 30% to 80% compliance; and doses that achieve around 100% compliance. This study shows that compliance with patching treatment averages less than 50% and is influenced by several factors. A greater understanding of these influences should improve treatment outcome. (ClinicalTrials.gov number, NCT00274664).

  19. Clean Air Markets - Compliance Query Wizard

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Compliance Query Wizard is part of a suite of Clean Air Markets-related tools that are accessible at http://ampd.epa.gov/ampd/. The Compliance module provides...

  20. Project Management Consultancy (PMC) procurement approach: Supplier's evaluation and selection dilemma

    Science.gov (United States)

    Nawi, Mohd Nasrun Mohd; Azimi, Mohd Azrulfitri; Pozin, Mohd Affendi Ahmad; Osman, Wan Nadri; Anuar, Herman Shah

    2016-08-01

    Project Management Consultancy (PMC) is part of the management oriented procurement method in which a sole consultant is hired by the client to deal with the contactors in place of the client. Appointing contractors in this method or approach looks to be interesting as client could play a pivotal role in evaluating and selecting the supplier/contractor for the work package. In some cases, client gives the authority for the PMC to hire the supplier/contractor of their choice while in some cases the client is the one who made the decision. This research paper seeks to investigate the dilemma arises from this situation and for the purpose of this research, a real case study was studied to assess the impacts of such dilemma to the performance of the project. Recommendations on how to tackle the dilemma will also be addressed in the later part of this research paper.

  1. Compliance Issues in Higher Education

    Science.gov (United States)

    Benedek, Petra

    2016-01-01

    Efficiency in the 1980's, quality in the 1990's, compliance in the 2010's - private sector management techniques and mechanisms find their way to public services. This paper facilitates the understanding of how compliance management controls can improve operations and prevent or detect failure or wrong doing. The last few years' empirical research…

  2. The Determinants of the Compliance to Public Procurement Policy Requirements among Public Enterprises in Zimbabwe

    Directory of Open Access Journals (Sweden)

    Maxwell Sandada

    2016-09-01

    Full Text Available Many public entities in Zimbabwe are operating in a very volatile environment characterised by public procurement systems open to abuse. Zimbabwe is one of the first countries in Africa to have a Procurement Act however non-compliance issues are still a challenge. Public procurement scandals have been a hot topic with the media and also with the Report of the Auditor General for the financial year ended December 31, 2014 having picked on a lot of issues relating to non-compliance with procurement regulations in a number of public enterprises. The purpose of the study was to assess the influence selected factors (enforcement, professionalism, political interferences, familiarity with Procurement Act regulations and ethics on compliance to procurement regulations within the public entities. A quantitative survey research approach was used to collect data from 144 public procurement professionals in public entities in Harare, Zimbabwe. SPSS software version 21 was used to process the data that were later analysed through correlation and regression analyses. Familiarity with procurement regulations, enforcement and political interference were found to be statistically significant predictors of compliance. The managerial implications and direction for future research are provided.

  3. A Review of Factors for Tax Compliance

    Directory of Open Access Journals (Sweden)

    Nicoleta BARBUTA-MISU

    2011-03-01

    Full Text Available The aim of this paper is to identify the variables of tax compliance analysed by researchers from various countries and adapting them to the Romanian conditions to create a model to include factors that influence decision of tax compliance. Tax compliance has been studied in economics by analysing the individual decision of a representative person between paying taxes and evading taxes. In the research of tax compliance have been done many empirical studies that emphasized the impact of a wide variety of potential determinants of voluntary compliance with individual income/profit tax filing and reporting obligations. The most important determinants identified are: economic factors as the level of income, audit probabilities, tax audit, tax rate, tax benefits, penalties, fines and other non-economic factors as attitudes toward taxes, personal, social and national norms, perceived fairness etc.

  4. Women, Islam, and Pakistan: A Selected Annotated Bibliography. Fulbright-Hays Summer Seminar Abroad Project.

    Science.gov (United States)

    Phillips, Brenda

    This bibliography features selected books, book chapters, research projects, and journal articles, published between 1953 and 1994, about the social, legal, economic, educational political, and professional position of Muslim Pakistani women. Sixteen of the references are annotated. An additional 41 bibliographic references to other materials, not…

  5. Determining Childhood Blood Lead Level Screening Compliance Among Physicians.

    Science.gov (United States)

    Haboush-Deloye, Amanda; Marquez, Erika R; Gerstenberger, Shawn L

    2017-08-01

    Childhood Lead Poisoning Prevention Programs throughout the U.S. have addressed childhood lead poisoning by implementing primary and secondary prevention efforts. While many programs have helped increase screening rates, in some states children under the age of six still have not been tested for lead. This study aims to identify the barriers to childhood blood lead testing and develop a strategy to increase the number of children tested. Clark County physicians who work with children six and under were surveyed about blood lead level (BLL) testing practices, particularly, adherence to Centers for Disease Control and Prevention (CDC) guidelines, and parental compliance with orders to have their children tested to determine their blood lead levels. In addition, select in-person interviews were conducted with physicians who reported high parental compliance to identify best practices and barriers. Of the 77 physicians that provided data, 48% indicated they did not follow CDC guideline compared to 52% who follow guidelines. 18 of the 30 (or 60%) physicians reported more than 80% of parents complied with doctor recommended BLL testing. Twelve physicians identified cost, lack of insurance, and absence of symptomology as persistent barriers to lead screening. This study identified barriers to childhood lead screening including inadequate parental adherence to physician-ordered screenings and physician non-compliance with screening recommendations are two primary contributors. Addressing these issues could increase screening in children and reduce the risk of lead poisoning.

  6. Compliance als Schutz vor Verbandsverantwortlichkeit?

    Directory of Open Access Journals (Sweden)

    Alexander Tipold

    2016-05-01

    Full Text Available Compliance bedeutet nicht nur Einhaltung und Beachtung von Vorschriften, sondern betrifft auch Maßnahmen, die die Einhaltung der Rechtsnormen absichern sollen und läuft somit auf eine Übererfüllung von Verpflichtungen hinaus. Wenn es keinen klaren Maßstab für Kontroll- und Überwachungspflichten gibt, besteht die Gefahr, dass Strafverfolgungsbehörden die Compliance-Maßnahmen als Maßstab heranziehen und so eine Verschärfung der Pflichten erzeugen. Nach den Regeln des Verbandsverantwortlichkeitsgesetzes schließt im Übrigen das beste Compliance-System nicht zwingend die Verbandsverantwortlichkeit aus, steht aber unter Umständen einem Verfahren gegen den Verband entgegen.

  7. Selection of the best consultant for SAP ERP project using combined AHP-IBA approach

    Directory of Open Access Journals (Sweden)

    Martinović Nataša

    2014-01-01

    Full Text Available In this paper we propose a combined AHP-IBA model for selecting the best SAP consultant for an SAP ERP project. The goal of the SAP Project Manager is to choose the best consultant, the one who is able to implement standard SAP functionalities with quality and on time. When making a decision on the basis of multiple criteria, the traditional Analytic Hierarchy Process (AHP method does not take into account the fact that attributes may correlate, assuming that there are no dependencies between them. However, the dependencies of the attributes can often be used to model important knowledge for multiple criteria decision analysis. We propose an extension to the traditional AHP method by applying Interpolative realization of Boolean algebra (IBA, using AHP to determine the criteria weights, and IBA to model the logical interactions among criteria. The research conducted on ERP consultant selection suggests that the decision making process is modelled more accurately if logical interactions between attributes are modelled before applying AHP.

  8. The perception of corporate services directorate in a metropolitan municipality on King III good governance compliance in business and projects

    Directory of Open Access Journals (Sweden)

    Sly Newton Mutiro

    2015-03-01

    Full Text Available Good governance has been and is a growing phenomenon for many business organisations regardless of size, profit margins and purpose for existence. The South African Metropolitan municipality Metropolitan Municipality is one such organisation that has adopted good governance models to business practices. The challenge was how to effectively and efficiently implement governance issues around projects and business organisations. A number of people, committees and institutions have developed different governance frameworks that can be adopted by organisations as a guide to good governance. This research is based on King III guide to good governance. The objective was to establish the perceptions of the corporate services directorate in the South African Metropolitan municipality municipality on King III good governance compliance by interviewing some employees orally and through a questionnaire. The responses were captured and analysed using IMB SPSS software. Problems were identified in governance training and understanding in general. Another major finding was poor communication internally and externally. To overcome these shortfall recommendations were made. Communication models, communication plan, governance models and training were recommended. The major challenges facing the South African Metropolitan municipality Metropolitan Municipality are poor effective governance communication and lack of governance training.

  9. The elderly on dialysis: some considerations in compliance.

    Science.gov (United States)

    McKevitt, P M; Jones, J F; Lane, D A; Marion, R R

    1990-10-01

    Compliance with scheduled treatments, dietary and fluid restrictions, and multiple medications is an important component in the care and well-being of end-stage renal disease (ESRD) patients. Given the rigorus and complex demands of dialysis, it is important to examine the issue of compliance, focusing on a large and ever-increasing segment of our patient population, the elderly. The ESRD literature reflects efforts to define and measure levels of compliance, identify factors that influence and predict compliance, and develop intervention strategies to improve adherence to treatment regimens. While limited attention has been focused specifically on the elderly, there are studies suggesting that age may be a factor associated with improved adherence and that social support may be a significant contributor to compliance in this patient group. In an effort to examine the current status and needs of the dialysis elderly, research is in progress at Chromalloy American Kidney Center, Washington University, which replicates a study of 5 years ago. Eighty-four patients age 60 and over, on dialysis for a minimum of 6 months, were identified. Sociodemographic, treatment, compliance, and functional capacity data were collected; additional mental and psychological testing was completed on patients willing and able to participate. Preliminary data suggest the current elderly population is larger and significantly older than that of 5 years ago. Other sociodemographic data indicate the population is increasingly female, black, and more socioeconomically disadvantaged. In regard to compliance, the vast majority of elderly demonstrate good compliance as measured by serum potassium, fair to good compliance with phosphorus, and fair to poor compliance with fluid restrictions.(ABSTRACT TRUNCATED AT 250 WORDS)

  10. International Criminal Justice and the Politics of Compliance

    NARCIS (Netherlands)

    Lamont, Christopher

    2010-01-01

    International Criminal Justice and the Politics of Compliance provides a comprehensive study of compliance with legal obligations derived from the International Criminal Tribunal for the former Yugoslavia's (ICTY) Statute and integrates theoretical debates on compliance into international justice

  11. 77 FR 31371 - Public Workshop: Privacy Compliance Workshop

    Science.gov (United States)

    2012-05-25

    ... presentations, including the privacy compliance fundamentals, privacy and data security, and the privacy... DEPARTMENT OF HOMELAND SECURITY Office of the Secretary Public Workshop: Privacy Compliance... Homeland Security Privacy Office will host a public workshop, ``Privacy Compliance Workshop.'' DATES: The...

  12. Ratemaking and accounting for allowances and compliance costs

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    The regulatory treatment of compliance costs and allowances will significantly affect both the utility's CAAA compliance decisions and the cost of compliance. Sections in this chapter include ratemaking treatment of allowances, utility buy-ins, the market test of compliance costs and utility incentive, FERC account classification, measuring the value of allowances, inventory methods for allowances, expense recognition of allowances, regulatory-created assets and liabilities, and application of the FERC proposal. 8 refs., 1 tab

  13. FutureGen Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Cabe, Jim; Elliott, Mike

    2010-09-30

    This report summarizes the comprehensive siting, permitting, engineering, design, and costing activities completed by the FutureGen Industrial Alliance, the Department of Energy, and associated supporting subcontractors to develop a first of a kind near zero emissions integrated gasification combined cycle power plant and carbon capture and storage project (IGCC-CCS). With the goal to design, build, and reliably operate the first IGCC-CCS facility, FutureGen would have been the lowest emitting pulverized coal power plant in the world, while providing a timely and relevant basis for coal combustion power plants deploying carbon capture in the future. The content of this report summarizes key findings and results of applicable project evaluations; modeling, design, and engineering assessments; cost estimate reports; and schedule and risk mitigation from initiation of the FutureGen project through final flow sheet analyses including capital and operating reports completed under DOE award DE-FE0000587. This project report necessarily builds upon previously completed siting, design, and development work executed under DOE award DE-FC26- 06NT4207 which included the siting process; environmental permitting, compliance, and mitigation under the National Environmental Policy Act; and development of conceptual and design basis documentation for the FutureGen plant. For completeness, the report includes as attachments the siting and design basis documents, as well as the source documentation for the following: • Site evaluation and selection process and environmental characterization • Underground Injection Control (UIC) Permit Application including well design and subsurface modeling • FutureGen IGCC-CCS Design Basis Document • Process evaluations and technology selection via Illinois Clean Coal Review Board Technical Report • Process flow diagrams and heat/material balance for slurry-fed gasifier configuration • Process flow diagrams and heat/material balance

  14. Nucleus: A pilot project

    Energy Technology Data Exchange (ETDEWEB)

    Finnell, Joshua Eugene [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Klein, Martin [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Cain, Brian J. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2017-05-09

    The proposal is to provide institutional infrastructure that facilitates management of research projects, research collaboration, and management, preservation, and discovery of data. Deploying such infrastructure will amplify the effectiveness, efficiency, and impact of research, as well as assist researchers in regards to compliance with both data management mandates and LANL security policy. This will facilitate discoverability of LANL research both within the lab and external to LANL.

  15. 40 CFR 1068.401 - What is a selective enforcement audit?

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 32 2010-07-01 2010-07-01 false What is a selective enforcement audit? 1068.401 Section 1068.401 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) AIR POLLUTION CONTROLS GENERAL COMPLIANCE PROVISIONS FOR ENGINE PROGRAMS Selective Enforcement Auditing § 1068.401 What is a selective enforcement audit...

  16. Environment, safety and health, management and organization compliance assessment, West Valley Demonstration Program, West Valley, New York

    International Nuclear Information System (INIS)

    1989-08-01

    An Environment, Safety and Health ''Tiger Team'' Assessment was conducted at the West Valley Demonstration Project. The Tiger Team was chartered to conduct an onsite, independent assessment of WVDP's environment, safety and health (ES ampersand H) programs to assure compliance with applicable Federal and State laws, regulations, and standards, and Department of Energy Orders. The objective is to provide to the Secretary of Energy the following information: current ES ampersand H compliance status of each facility; specific noncompliance items; ''root causes'' for noncompliance items; evaluation of the adequacy of ES ampersand H organization and resources (DOE and contractor) and needed modifications; and where warranted, recommendations for addressing identified problem areas

  17. Information security policy development for compliance

    CERN Document Server

    Williams, Barry L

    2013-01-01

    Although compliance standards can be helpful guides to writing comprehensive security policies, many of the standards state the same requirements in slightly different ways. Information Security Policy Development for Compliance: ISO/IEC 27001, NIST SP 800-53, HIPAA Standard, PCI DSS V2.0, and AUP V5.0 provides a simplified way to write policies that meet the major regulatory requirements, without having to manually look up each and every control. Explaining how to write policy statements that address multiple compliance standards and regulatory requirements, the book will he

  18. 40 CFR 80.1352 - What are the pre-compliance reporting requirements for the gasoline benzene program?

    Science.gov (United States)

    2010-07-01

    ...) Benzene concentration. An estimate of the average gasoline benzene concentration corresponding to the time... engineering and permitting, Procurement and Construction, and Commissioning and startup. (7) Basic information regarding the selected technology pathway for compliance (e.g., precursor re-routing or other technologies...

  19. Utilization of handheld computing to simplify compliance

    International Nuclear Information System (INIS)

    Galvin, G.; Rasmussen, J.; Haines, A.

    2008-01-01

    Monitoring job site performance and building a continually improving organization is an ongoing challenge for operators of process and power generation facilities. Stakeholders need to accurately capture records of quality and safety compliance, job progress, and operational experiences (OPEX). This paper explores the use of technology-enabled processes as a means for simplifying compliance to quality, safety, administrative, maintenance and operations activities. The discussion will explore a number of emerging technologies and their application to simplifying task execution and process compliance. This paper will further discuss methodologies to further refine processes through trending improvements in compliance and continually optimizing and simplifying through the use of technology. (author)

  20. Compliance officers and legal advisers in power supply companies. interactions between compliance, risk management and the employer-employee relationship; Compliance-Beauftragte und Justitiare in EVU. Wechselwirkungen von Compliance, Risikomanagement und Arbeitsverhaeltnis

    Energy Technology Data Exchange (ETDEWEB)

    Gold, Juergen [Sozietaet Becker Buettner Held, Muenchen (Germany); Schaefer, Ralf; Bussmann, Sandra [Sozietaet Becker Buettner Held, Koeln (Germany)

    2011-06-15

    An inevitable task of any employee who has been appointed compliance officer, head of the legal department or internal auditor is to ensure that the company is protected against detriment through breaches of law or regulations. Another of his or her tasks, however, and one which might not be as obvious, is to ensure that parties outside the company are protected against detriment through his or her own employer. In order to deal appropriately with these and related questions some basic considerations on the necessity and function of compliance surveillance and its relationship with risk management must first be made. Using two significant court decisions for illustration the authors make a close examination of the liability issues involved in this area of potential conflict. They identify some salient points which should be considered in framing the contractual relationship between a compliance officer and his or her employer.

  1. Improving Metadata Compliance for Earth Science Data Records

    Science.gov (United States)

    Armstrong, E. M.; Chang, O.; Foster, D.

    2014-12-01

    One of the recurring challenges of creating earth science data records is to ensure a consistent level of metadata compliance at the granule level where important details of contents, provenance, producer, and data references are necessary to obtain a sufficient level of understanding. These details are important not just for individual data consumers but also for autonomous software systems. Two of the most popular metadata standards at the granule level are the Climate and Forecast (CF) Metadata Conventions and the Attribute Conventions for Dataset Discovery (ACDD). Many data producers have implemented one or both of these models including the Group for High Resolution Sea Surface Temperature (GHRSST) for their global SST products and the Ocean Biology Processing Group for NASA ocean color and SST products. While both the CF and ACDD models contain various level of metadata richness, the actual "required" attributes are quite small in number. Metadata at the granule level becomes much more useful when recommended or optional attributes are implemented that document spatial and temporal ranges, lineage and provenance, sources, keywords, and references etc. In this presentation we report on a new open source tool to check the compliance of netCDF and HDF5 granules to the CF and ACCD metadata models. The tool, written in Python, was originally implemented to support metadata compliance for netCDF records as part of the NOAA's Integrated Ocean Observing System. It outputs standardized scoring for metadata compliance for both CF and ACDD, produces an objective summary weight, and can be implemented for remote records via OPeNDAP calls. Originally a command-line tool, we have extended it to provide a user-friendly web interface. Reports on metadata testing are grouped in hierarchies that make it easier to track flaws and inconsistencies in the record. We have also extended it to support explicit metadata structures and semantic syntax for the GHRSST project that can be

  2. Contemplating compliance: European compliance mechanisms in international perspective

    NARCIS (Netherlands)

    Koops, C.E.

    2014-01-01

    How can international organizations make their Member States comply with the rules of the organization? Which is the more effective method: to coax and entice, to argue and persuade, or to threaten and punish? On the basis of which criteria should a compliance mechanism be construed and applied,

  3. Compliance with barrier precautions during paediatric trauma resuscitations.

    Science.gov (United States)

    Kelleher, Deirdre C; Carter, Elizabeth A; Waterhouse, Lauren J; Burd, Randall S

    2013-03-01

    Barrier precautions protect patients and providers from blood-borne pathogens. Although barrier precaution compliance has been shown to be low among adult trauma teams, it has not been evaluated during paediatric resuscitations in which perceived risk of disease transmission may be low. The purpose of this study was to identify factors associated with compliance with barrier precautions during paediatric trauma resuscitations. Video recordings of resuscitations performed on injured children (compliance with an established policy requiring gowns and gloves. Depending on activation level, trauma team members included up to six physicians, four nurses, and a respiratory therapist. Multivariate logistic regression was used to determine the effect of team role, resuscitation factors, and injury mechanism on barrier precaution compliance. Over twelve weeks, 1138 trauma team members participated in 128 resuscitations (4.7% penetrating injuries, 9.4% highest level activations). Compliance with barrier precautions was 81.3%, with higher compliance seen among roles primarily at the bedside compared to positions not primarily at the bedside (90.7% vs. 65.1%, pcompliance, while surgical attendings (20.8%) had the lowest (prole, increased compliance was observed during resuscitations of patients with penetrating injuries (OR=3.97 [95% CI: 1.35-11.70], p=0.01), during resuscitations triaged to the highest activation level (OR=2.61 [95% CI: 1.34-5.10], p=0.005), and among team members present before patient arrival (OR=4.14 [95% CI: 2.29-7.39], pCompliance with barrier precautions varies by trauma team role. Team members have higher compliance when treating children with penetrating and high acuity injuries and when arriving before the patient. Interventions integrating barrier precautions into the workflow of team members are needed to reduce this variability and improve compliance with universal precautions during paediatric trauma resuscitations. Copyright © 2012 Elsevier

  4. COMPLIANCE AS FACTORING BUSINESS RISK MANAGEMENT: CONTROL ASPECTS

    Directory of Open Access Journals (Sweden)

    V.K. Makarovych

    2016-03-01

    Full Text Available Indetermination of modern economy conditions and the lack of theoretical knowledge gained by domestic scientists about risk in factoring business actualize the research concerning the methodology and technique of factoring companies’ risk management. The article examines compliance which is the technology innovative for Ukrainian market of factoring risk management technologies. It is determined that the compliance is the risk management process directed to free will correspondence to state, international legislation as well as to the ethics standards accepted in the field of regulated legal relations and to the traditions of business circulation to sustain the necessary regulations and standards of market behaviour, and to consolidate the image of a factoring company. Compliance risks should be understood as the risks of missed profit or losses caused by the conflicts of interests and the discrepancy of employees’ actions to internal and external standard documents. The attention is paid to the control over the compliance. The author singles out 3 kinds of the compliance control such as institutional, operational and the compliance control over the observance of conducting business professional ethics regulations which are necessary for providing of efficient management of factoring business risks. The paper shows the organizing process of factoring business compliance control (by the development of internal standard documents, a compliance program, the foundation of compliance control subdivision, monitoring of the risks cause the choice, made by management entities of a factoring company, of the management methods of risks for their business. The development of new and improvement of existed forms of compliance control organizing process help satisfy users’ information needs and requests of the risk management factoring company department. The suggestions proposed create the grounds for the transformation and improvement of factoring

  5. [Insufficient medication compliance in Parkinson's disease

    NARCIS (Netherlands)

    Aerts, M.B.; Eijk, M. van der; Kramers, C.; Bloem, B.R.

    2011-01-01

    Medication compliance is generally suboptimal, particularly in patients with complex polypharmacy. This generic treatment problem is described here for Parkinson's disease (PD). We would expect patients with PD to have good medication compliance, since missed doses immediately result in worsening of

  6. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    International Nuclear Information System (INIS)

    Matson, D M; Hyers, R W; Volkmann, T; Fecht, H-J

    2011-01-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  7. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    Science.gov (United States)

    Matson, D. M.; Hyers, R. W.; Volkmann, T.; Fecht, H.-J.

    2011-12-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  8. 33 CFR 337.10 - Supervision of Federal projects.

    Science.gov (United States)

    2010-07-01

    ... plans and description of the project as expressed in the SOF or ROD. Conditions and/or limitations... aware of their responsibilities for compliance with the terms and conditions of state certifications and other conditions expressed in the SOF or ROD. ...

  9. Business process compliance management : an integrated proactive approach

    NARCIS (Netherlands)

    Elgammal, A.; Sebahi, S.; Turetken, O.; Hacid, M.-S.; Papazoglou, M.; van den Heuvel, W.; Soliman, K.S.

    2014-01-01

    Today’s enterprises demand a high degree of compliance of business processes to meet regulations, such as Sarbanes-Oxley and Basel I-III. To ensure continuous guaranteed compliance, compliance management should be considered during all phases of the business process lifecycle; from the analysis and

  10. SNF project's MCO compliance assessment with DOE ''general design criteria,'' order 6430.1A and ''SNF project MCO additional NRC requirements,'' HNF-SD-SNF-DB-005

    International Nuclear Information System (INIS)

    GOLDMANN, L.H.

    1999-01-01

    This document is presented to demonstrate the MCOs compliance to the major design criteria invoked on the MCO. This document is broken down into a section for the MCO's evaluation against DOE Order 6430.1A General Design Criteria sixteen divisions and then the evaluation of the MCO against HNF-SD-SNF-DB-005 ''Spent Nuclear Fuel Project Multi-Canister Overpack Additional NRC Requirements.'' The compliance assessment is presented as a matrix in tabular form. The MCO is the primary container for the K-basin's spent nuclear fuel as it leaves the basin pools and through to the 40 year interim storage at the Canister Storage Building (CSB). The MCO and its components interface with; the K basins, shipping cask and transportation system, Cold Vacuum Drying facility individual process bays and equipment, and CSB facility including the MCO handling machine (MHM), the storage tubes, and the MCO work stations where sampling, welding, and inspection of the MCO is performed. As the MCO is the primary boundary for handling, process, and storage, its main goals are to minimize the spread of its radiological contents to the outside of the MCO and provide for nuclear criticality control. The MCO contains personnel radiation shielding only on its upper end, in the form of a shield plug, where the process interfaces are located. Shielding beyond the shield plug is the responsibility of the using facilities. The design of the MCO and its components is depicted in drawings H-2-828040 through H-2-828075. Not every drawing number in the sequence is used. The first drawing number, H-2-828040, is the drawing index for the MCO. The design performance specification for the MCO is HW-S-0426, and was reviewed and approved by the interfacing design authorities, the safety, regulatory, and operations groups, and the local DOE office. The current revision for the design performance specification is revision 5. The designs of the MCO have been reviewed and approved in a similar way and the reports

  11. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-01-01

    Full Text Available The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB project in China is used to demonstrate how to apply these two methods and their advantages.

  12. Problems about the analysis of technical requirements compliance in NPPPCI systems

    International Nuclear Information System (INIS)

    Perello, M.

    1978-01-01

    The display of the problems that the analysis of the technical requirements compliance bring along is presented. In the project of nuclear power plants, above all, the influence of national and international standards in the analysis of the adjustment of requirements established by the governments of nuclear safety of the different countries. In the oral presentation greater emphasis is made on the difficulties that the PSAR evaluation brings when the lack of technical standards in the owner country makes necessary the use of other countries rules. (author)

  13. Compliance with Antimalaria Chemoprophylaxis in a Combat Zone

    Science.gov (United States)

    Brisson, Michael; Brisson, Paul

    2012-01-01

    Compliance with malaria chemoprophylaxis by military service members (MSMs) is notoriously low, ranging from 30% to 56%. Our objective was to determine the rate of compliance and reasons for non-compliance with malaria chemoprophylaxis among healthy US MSMs in Afghanistan. An eight-question, anonymous online survey was used to collect data regarding the compliance of healthy MSMs with malaria chemoprophylaxis. E-mail surveys were sent to 1,200 MSMs; 528 (44%) MSMs completed the survey. One-time daily doxycycline was the most commonly prescribed chemoprophylaxis (90%); 60% (N = 318) responded that they were compliant with their chemoprophylaxis as prescribed, whereas 40% (N = 221) indicated that they were not compliant. Compliance with daily dosing was 61% and weekly dosing was 38%. The most common reasons for non-compliance were gastrointestinal effects (39%), forgetfulness (31%), and low perception of risk (24%). Malaria chemoprophylaxis compliance by healthy MSMs in Afghanistan is poor. Side effects, forgetfulness, and lack of education are contributing factors. Commanders bear the primary responsibility for the health of their soldiers, and the individual MSM bears personal responsibility; however, additional public health interventions could possibly have a positive impact on prevention. PMID:22492140

  14. Survey of siting practices for selected management projects in seven countries

    International Nuclear Information System (INIS)

    Hardin, E.; Aahagen, H.

    1992-06-01

    This paper surveys siting practices for deep geologic disposal in seven countries, and attempts to formulate generalizations which could be useful for the upcoming review of the Swedish plan for siting the SFL repository (R and D 92). Comparison of projects in different countries is done with full appreciation of the technical, legal, and cultural differences. The seven countries were selected for experience with siting in crystalline rock, similarity of siting practices to Sweden, and the availability of published information. Local governments have demonstrated effective veto power in each of the seven countries surveyed, although this power is exercised in different ways. This paper shows how the siting strategy itself affects the ability and the inclination of localities to block the project. It shows by example that public involvement, parallel vs. sequential characterization, schedule for siting activities, and the existence of interim waste storage capability have an impact on the success of siting. The focus of this paper is deep geologic disposal. Shallow land disposal and non-radioactive wastes are not discussed in detail, with three exceptions: LLW disposal siting in the U.S. and Canada, and the SAKAB incinerator projects in Sweden. These provide insight into siting approaches and demonstrate that conclusions regarding deep geologic disposal are supported by other experience. (114 refs.) (au)

  15. INDONESIA SHARI'AH COMPLIANCE STOCK RETURN BEHAVIOUR

    Directory of Open Access Journals (Sweden)

    Helma Malini

    2017-04-01

    Full Text Available This study aims to measures the behaviour of Indonesia Shari'ah compliance stock return. The measurement of return behaviour toward volatility will proved the capability of Indonesia Shari'ah compliance toward volatility that happened in Indonesia during the period of observation. Investing in Shari'ah compliance is quite different than investing in conventional stock which followed the capital market set of rules and law, Shari'ah compliance follows not only the capital market set of laws and but also the Islamic principles of principles. Most of the previous studies examine issues related to the conventional stocks and market. The present study take one step further by investigating issue related to Shari'ah compliance instrument. In the case of Shari'ah stock price in Indonesia, the dynamics volatility of the stock price can be minimized by taking an integrated screening process to the listed company, as precautions steps toward volatility

  16. The everyday elasticity of compliance in a symptomless disease

    DEFF Research Database (Denmark)

    Felde, Lina Hoel

    2011-01-01

    Medically, compliance refers to the extent to which a patient's response to medical advice coincides with doctors' orders. Rather than this absolute standard, this article treats compliance as an institutionally available discourse continually figured in practice. The aim of this article is to de......Medically, compliance refers to the extent to which a patient's response to medical advice coincides with doctors' orders. Rather than this absolute standard, this article treats compliance as an institutionally available discourse continually figured in practice. The aim of this article...... give-and-take. This elasticity of compliance reveals a reflexive critique of medical compliance as a moral standard and leads us to discuss how people are adequately compliant in everyday moral contexts....

  17. Telemedical Support in Patients with Chronic Heart Failure: Experience from Different Projects in Germany

    Directory of Open Access Journals (Sweden)

    Axel Müller

    2010-01-01

    Full Text Available The great epidemiological significance and costs associated with chronic heart failure pose a challenge to health systems in Western industrial countries. In the past few years, controlled randomised studies have shown that patients with chronic heart failure benefit from telemedical monitoring; specifically, telemonitoring of various vital parameters combined with a review of the symptoms, drug compliance and patient education. In Germany, various telemedical monitoring projects for patients with chronic heart failure have been initiated in the past few years; seven of them are presented here. Currently 7220 patients are being monitored in the seven selected projects. Most patients (51.1% are in NYHA stage II, 26.3% in NYHA stage III, 14.5% in NYHA stage I and only 6.6% in NYHA stage IV respectively. Most projects are primarily regional. Their structure of telemedical monitoring tends to be modular and uses stratification according to the NYHA stages. All projects include medical or health economics assessments. The future of telemedical monitoring projects for patients with chronic heart failure will depend on the outcome of these assessments. Only of there is statistical evidence for medical benefit to the individual patient as well as cost savings will these projects continue.

  18. Physician Verbal Compliance-Gaining Strategies and Patient Satisfaction

    Science.gov (United States)

    Olynick, Janna; Iliopulos, Alexandra; Li, Han Z.

    2017-01-01

    Purpose: The patient healthcare experience is a complex phenomenon, as is encouraging patient compliance with medical advice. To address this multifaceted relationship, the purpose of this paper is to explore the ways resident physicians verbally encourage patient compliance and the relationship between these compliance-seeking strategies and…

  19. Long term telemedicine study of compliance in paranoid schizophrenia.

    Science.gov (United States)

    Krzystanek, Marek; Krzeszowski, Dariusz; Jagoda, Karolina; Krysta, Krzysztof

    2015-09-01

    Low compliance is one of the crucial problems of contemporary psychiatry. Relapses, deterioration of cognitive functioning, negative symptoms, neuroleptic resistance are the examples of many consequences of noncompliance in schizophrenia The study was designed to assess the compliance in the 200 patients diagnosed with paranoid schizophrenia, all in the state of symptomatic remission and on the stable neuroleptic treatment. The compliance was assessed using a telepsychiatric system, sending reminders: 1 hour before the planned dose to remind them that drug intake is approaching, and at the moment of intake to check if they took the drug. The confirmed drug intakes were counted by the telepsychiatric system. 158 patients completed the study period. The compliance in the first month of the treatment was 44.6% and decreased over the rest of the period to the level of 33.4%. 50% of the schizophrenic patients were compliant at a level lower than 37%. This group was considered the low compliance group, and in this group the compliance increased after 6 months from 9.3% to 10.3% (p<0.0001). The compliance in the group of schizophrenic patients in remission is very low. The telemedicine system improves the compliance in the patients with the worst compliance.

  20. Rocky Flats Compliance Program

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November 1989. The primary objective of the Office of Technology Development, Rocky Flats Compliance Program (RFCP), is to develop altemative treatment technologies for mixed low-level waste (wastes containing both hazardous and radioactive components) to use in bringing the Rocky Flats Plant (RFP) into compliance with Federal and state regulations and agreements. Approximately 48,000 cubic feet of untreated low-level mixed waste, for which treatment has not been specified, are stored at the RFP. The cleanup of the Rocky Flats site is driven by agreements between DOE, the Environmental Protection Agency (EPA), and the Colorado Department of Health (CDH). Under these agreements, a Comprehensive Treatment and Management Plan (CTMP) was drafted to outline the mechanisms by which RFP will achieve compliance with the regulations and agreements. This document describes DOE's strategy to treat low-level mixed waste to meet Land Disposal Restrictions and sets specific milestones related to the regulatory aspects of technology development. These milestones detail schedules for the development of technologies to treat all of the mixed wastes at the RFP. Under the Federal Facilities Compliance Act (FFCA), the CTMP has been incorporated into Rocky Flats Plant Conceptual Site Treatment Plan (CSTP). The CSTP will become the Rocky Flats Plant site Treatment Plan in 1995 and will supersede the CTMP

  1. The prevalence of, and factors related to, compliance with glove utilization among nurses in Hospital Universiti Sains Malaysia.

    Science.gov (United States)

    Naing, L; Nordin, R; Musa, R

    2001-09-01

    Increasing risk of HIV infections among health care workers has been a continuing concern. The study was designed to identify the compliance of glove utilization, and factors related to non-compliance. A sample of 150 staff nurses were recruited from the study population of 550 nurses in Hospital Universiti Sains Malaysia. Data were collected by using a structured self-administered questionnaires. The response rate was 98.4%. The study revealed a low compliance (13.5%) of glove utilization (for all 9 procedures), which varied among different procedures (27-97%). Younger nurses and those with shorter duration of working experience had better knowledge of Universal Precautions. Nurses in intensive care unit and operation theatre were better in both knowledge and compliance of glove utilization. The three commonest misconceptions were identified as "selective use of gloves for high risk groups and suspected cases", and "tendency to depend on HIV prevalence". Nurses reported practical problems including administrative and personal related such as "stock irregularity" (46%), "glove not available at the emergency sites" (44%), and "reduction of tactile sensation" (39%). It was concluded that poor knowledge and practical problems were possible responsible factors for the low compliance. A good training for nurses comprising principle and practice of Universal Precautions, updated knowledge of blood and body fluid borne infections and risk and its management, will probably improve the compliance.

  2. 14 CFR 431.83 - Compliance monitoring.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Compliance monitoring. 431.83 Section 431.83 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... Requirements-Reusable Launch Vehicle Mission License Terms and Conditions § 431.83 Compliance monitoring. A...

  3. 14 CFR 437.93 - Compliance monitoring.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Compliance monitoring. 437.93 Section 437.93 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT....93 Compliance monitoring. A permittee must allow access by, and cooperate with, federal officers or...

  4. 14 CFR 420.49 - Compliance monitoring.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Compliance monitoring. 420.49 Section 420.49 Aeronautics and Space COMMERCIAL SPACE TRANSPORTATION, FEDERAL AVIATION ADMINISTRATION, DEPARTMENT... Compliance monitoring. A licensee shall allow access by and cooperate with federal officers or employees or...

  5. 40 CFR 425.05 - Compliance dates.

    Science.gov (United States)

    2010-07-01

    ... 40 Protection of Environment 29 2010-07-01 2010-07-01 false Compliance dates. 425.05 Section 425.05 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) EFFLUENT GUIDELINES AND STANDARDS LEATHER TANNING AND FINISHING POINT SOURCE CATEGORY General Provisions § 425.05 Compliance dates...

  6. Diagnostic information in temporal compliance checking

    NARCIS (Netherlands)

    Ramezani Taghiabadi, E.; Fahland, D.; Dongen, van B.F.; Aalst, van der W.M.P.

    2012-01-01

    Compliance checking is gaining importance as today’s organizations need to show that operational processes are executed in a controlled manner while satisfying prede¿ned (legal) requirements. Deviations may be costly and expose the organization to severe risks. Compliance checking is of growing

  7. 34 CFR 1200.170 - Compliance procedures.

    Science.gov (United States)

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Compliance procedures. 1200.170 Section 1200.170 Education Regulations of the Offices of the Department of Education (Continued) NATIONAL COUNCIL ON... agency shall notify the Architectural and Transportation Barriers Compliance Board upon receipt of any...

  8. Wall compliance and violin cavity modes.

    Science.gov (United States)

    Bissinger, George

    2003-03-01

    Violin corpus wall compliance, which has a substantial effect on cavity mode frequencies, was added to Shaw's two-degree-of-freedom (2DOF) network model for A0 ("main air") and A1 (lowest length mode included in "main wood") cavity modes. The 2DOF model predicts a V(-0.25) volume dependence for A0 for rigid violin-shaped cavities, to which a semiempirical compliance correction term, V(-x(c)) (optimization parameter x(c)) consistent with cavity acoustical compliance and violin-based scaling was added. Optimizing x(c) over A0 and A1 frequencies measured for a Hutchins-Schelleng violin octet yielded x(c) approximately 0.08. This markedly improved A0 and A1 frequency predictions to within approximately +/- 10% of experiment over a range of about 4.5:1 in length, 10:1 in f-hole area, 3:1 in top plate thickness, and 128:1 in volume. Compliance is a plausible explanation for A1 falling close to the "main wood" resonance, not increasingly higher for the larger instruments, which were scaled successively shorter compared to the violin for ergonomic and practical reasons. Similarly incorporating compliance for A2 and A4 (lowest lower-/upper-bout modes, respectively) improves frequency predictions within +/-20% over the octet.

  9. Project selection problem under uncertainty: An application of utility theory and chance constrained programming to a real case

    Directory of Open Access Journals (Sweden)

    Reza Hosnavi Atashgah

    2013-06-01

    Full Text Available Selecting from a pool of interdependent projects under certainty, when faced with resource constraints, has been studied well in the literature of project selection problem. After briefly reviewing and discussing popular modeling approaches for dealing with uncertainty, this paper proposes an approach based on chance constrained programming and utility theory for a certain range of problems and under some practical assumptions. Expected Utility Programming, as the proposed modeling approach, will be compared with other well-known methods and its meaningfulness and usefulness will be illustrated via two numerical examples and one real case.

  10. How good is compliance with smoke-free legislation in India? Results of 38 subnational surveys.

    Science.gov (United States)

    Kumar, Ravinder; Goel, Sonu; Harries, Anthony D; Lal, Pranay; Singh, Rana J; Kumar, Ajay M V; Wilson, Nevin C

    2014-09-01

    India has been implementing smoke-free legislation since 2008 prohibiting smoking in public places. This study aimed to assess the level of compliance with smoke-free legislation (defined as the presence of no-smoking signage and the absence of active smoking, smoking aids, cigarette butts/bidi ends and smoking smell) and the role of enforcement systems in Indian jurisdictions. This was a cross-sectional, retrospective review of reports and primary data sheets of surveys conducted in 38 selected jurisdictions across India in 2012-2013. Of 20 455 public places (in 38 jurisdictions), 10 377 (51%) demonstrated full compliance with smoke-free law. Educational institutions and healthcare facilities performed well at 65% and 62%, respectively, while eateries and frequently visited other public places (such as bus stands, railway stations, shopping malls, stadia, cinema halls etc.) performed poorly at 37% and 27%, respectively. Absence of no-smoking signage was the largest contributor to non-compliance across all types of public places. Enforcement systems were present in all jurisdictions, but no associations could be demonstrated between these and smoke-free compliance. Smoke-free compliance in public places in India was suboptimal and was mainly related to the absence of no-smoking signage. This warrants further pragmatic and innovative ways to improve the situation. © The Author 2014. Published by Oxford University Press on behalf of Royal Society of Tropical Medicine and Hygiene. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  11. Tax compliance costs: a business administration perspective

    OpenAIRE

    Eichfelder, Sebastian; Schorn, Michael

    2009-01-01

    The paper analyses the relationship of tax compliance costs and business strategy. Due to instruments, like information technology, simplified cash accounting or outsourcing compliance activities to tax advisers, private businesses have a set of strategies to optimize their tax compliance cost burden. Under the assumption of rational choice a private business should choose a cost-optimal administration strategy. In spite of that we find empirical evidence for small German businesses using onl...

  12. Compliance With Infection Prevention Guidelines By Health Care ...

    African Journals Online (AJOL)

    revealed varied levels of compliance on different components of infection prevention. The highest level of compliance (100%) was with single use of needles and syringes while the lowest (35.1) was with decontamination of needles and syringes with 0.5% chlorine solution prior to disposal. Compliance with hand hygiene ...

  13. 30 CFR 773.11 - Review of compliance history.

    Science.gov (United States)

    2010-07-01

    ... 30 Mineral Resources 3 2010-07-01 2010-07-01 false Review of compliance history. 773.11 Section... REGULATORY PROGRAMS REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING § 773.11 Review of compliance history. (a... histories of compliance with the Act or the applicable State regulatory program, and any other applicable...

  14. Compliance to two city convenience store ordinance requirements

    Science.gov (United States)

    Menéndez, Cammie K Chaumont; Amandus, Harlan E; Wu, Nan; Hendricks, Scott A

    2015-01-01

    Background Robbery-related homicides and assaults are the leading cause of death in retail businesses. Robbery reduction approaches focus on compliance to Crime Prevention Through Environmental Design (CPTED) guidelines. Purpose We evaluated the level of compliance to CPTED guidelines specified by convenience store safety ordinances effective in 2010 in Dallas and Houston, Texas, USA. Methods Convenience stores were defined as businesses less than 10 000 square feet that sell grocery items. Store managers were interviewed for store ordinance requirements from August to November 2011, in a random sample of 594 (289 in Dallas, 305 in Houston) convenience stores that were open before and after the effective dates of their city’s ordinance. Data were collected in 2011 and analysed in 2012–2014. Results Overall, 9% of stores were in full compliance, although 79% reported being registered with the police departments as compliant. Compliance was consistently significantly higher in Dallas than in Houston for many requirements and by store type. Compliance was lower among single owner-operator stores compared with corporate/franchise stores. Compliance to individual requirements was lowest for signage and visibility. Conclusions Full compliance to the required safety measures is consistent with industry ‘best practices’ and evidence-based workplace violence prevention research findings. In Houston and Dallas compliance was higher for some CPTED requirements but not the less costly approaches that are also the more straightforward to adopt. PMID:26337569

  15. Proposal for Land Consolidation Project Solutions for Selected Problem Areas

    Science.gov (United States)

    Wojcik-Len, Justyna; Strek, Zanna

    2017-12-01

    One of the economic tools for supporting agricultural policy are the activities implemented under the Rural Development Program (RDP). By encouraging agricultural activities and creating equal opportunities for development of farms, among others in areas with unfavourable environmental conditions characterized by low productivity of soils exposed to degradation, decision makers can contribute to improving the spatial structure of rural areas. In Poland, one of the major concerns are agricultural problem areas (regions). In view of this situation, the aim of this article was to characterize the problem areas in question and propose land consolidation project solutions for selected fragments of those areas. This paper presents the results of a review of literature and an analysis of geodetic and cartographic data regarding the problem areas. The process of land consolidation, which is one of the technical and legal instruments supporting the development of rural areas, was characterized. The study allowed the present authors to establish criteria for selecting agricultural problem areas for land consolidation. To develop a proposal for rational management of the problem areas, key general criteria (location, topography, soil quality and usefulness) and specific criteria were defined and assigned weights. A conception of alternative development of the agricultural problem areas was created as part of a land consolidation project. The results were used to create a methodology for the development of agricultural problem areas to be employed during land consolidation in rural areas. Every agricultural space includes areas with unfavourable environmental and soil conditions determined by natural or anthropogenic factors. Development of agricultural problem areas through land consolidation should take into account the specific functions assigned to these areas in land use plans, as well as to comply with legal regulations.

  16. Caregivers' compliance with referral advice

    DEFF Research Database (Denmark)

    Lal, Sham; Ndyomugenyi, Richard; Paintain, Lucy

    2018-01-01

    BACKGROUND: Several malaria endemic countries have implemented community health worker (CHW) programmes to increase access to populations underserved by health care. There is considerable evidence on CHW adherence to case management guidelines, however, there is limited evidence on the compliance...... in the control arm were trained to treat malaria with ACTs based on fever symptoms. Caregivers' referral forms were linked with CHW treatment forms to determine whether caregivers complied with the referral advice. Factors associated with compliance were examined with logistic regression. RESULTS: CHW saw 18......,497 child visits in the moderate-to-high transmission setting and referred 15.2% (2815/18,497) of all visits; in the low-transmission setting, 35.0% (1135/3223) of all visits were referred. Compliance to referral was low, in both settings

  17. 49 CFR 28.170 - Compliance procedures.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Compliance procedures. 28.170 Section 28.170 Transportation Office of the Secretary of Transportation ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE DEPARTMENT OF TRANSPORTATION § 28.170 Compliance...

  18. Mobile Source Emissions Regulatory Compliance Data Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Mobile Source Emissions Regulatory Compliance Data Inventory data asset contains measured summary compliance information on light-duty, heavy-duty, and non-road...

  19. 75 FR 70881 - Designation of a Chief Compliance Officer; Required Compliance Policies; and Annual Report of a...

    Science.gov (United States)

    2010-11-19

    ... example, partnerships and limited liability companies) that may have forms of governing bodies other than... function subject to regulation by the Commission; if a limited liability company or limited liability... chief compliance officers to administer compliance policies that include, but are not limited to, all...

  20. Knowledge about pandemic influenza and compliance with containment measures among Australians.

    Science.gov (United States)

    Eastwood, Keith; Durrheim, David; Francis, J Lynn; d'Espaignet, Edouard Tursan; Duncan, Sarah; Islam, Fakhrul; Speare, Rick

    2009-08-01

    To examine the level of stated compliance with public health pandemic influenza control measures and explore factors influencing cooperation for pandemic influenza control in Australia. A computer-assisted telephone interview survey was conducted by professional interviewers to collect information on the Australian public's knowledge of pandemic influenza and willingness to comply with public health control measures. The sample was randomly selected using an electronic database and printed telephone directories to ensure sample representativeness from all Australian states and territories. After we described pandemic influenza to the respondents to ensure they understood the significance of the issue, the questions on compliance were repeated and changes in responses were analysed with McNemar's test for paired data Only 23% of the 1166 respondents demonstrated a clear understanding of the term 'pandemic influenza'. Of those interviewed, 94.1% reported being willing to comply with home quarantine; 94.2%, to avoid public events; and 90.7%, to postpone social gatherings. After we explained the meaning of 'pandemic' to interviewees, stated compliance increased significantly (to 97.5%, 98.3% and 97.2% respectively). Those who reported being unfamiliar with the term 'pandemic influenza,' male respondents and employed people not able to work from home were less willing to comply. In Australia, should the threat arise, compliance with containment measures against pandemic influenza is likely to be high, yet it could be further enhanced through a public education programme conveying just a few key messages. A basic understanding of pandemic influenza is associated with stated willingness to comply with containment measures. Investing now in promoting measures to prepare for a pandemic or other health emergency will have considerable value.

  1. Federal Facilities Compliance Act, Draft Site Treatment Plan: Compliance Plan Volume. Part 2, Volume 2

    International Nuclear Information System (INIS)

    1994-01-01

    This document presents the details of the implementation of the Site Treatment Plan developed by Ames Laboratory in compliance with the Federal Facilities Compliance Act. Topics discussed in this document include: implementation of the plan; milestones; annual updates to the plan; inclusion of new waste streams; modifications of the plan; funding considerations; low-level mixed waste treatment plan and schedules; and TRU mixed waste streams

  2. An Objective Approach to Select Climate Scenarios when Projecting Species Distribution under Climate Change.

    Directory of Open Access Journals (Sweden)

    Nicolas Casajus

    Full Text Available An impressive number of new climate change scenarios have recently become available to assess the ecological impacts of climate change. Among these impacts, shifts in species range analyzed with species distribution models are the most widely studied. Whereas it is widely recognized that the uncertainty in future climatic conditions must be taken into account in impact studies, many assessments of species range shifts still rely on just a few climate change scenarios, often selected arbitrarily. We describe a method to select objectively a subset of climate change scenarios among a large ensemble of available ones. Our k-means clustering approach reduces the number of climate change scenarios needed to project species distributions, while retaining the coverage of uncertainty in future climate conditions. We first show, for three biologically-relevant climatic variables, that a reduced number of six climate change scenarios generates average climatic conditions very close to those obtained from a set of 27 scenarios available before reduction. A case study on potential gains and losses of habitat by three northeastern American tree species shows that potential future species distributions projected from the selected six climate change scenarios are very similar to those obtained from the full set of 27, although with some spatial discrepancies at the edges of species distributions. In contrast, projections based on just a few climate models vary strongly according to the initial choice of climate models. We give clear guidance on how to reduce the number of climate change scenarios while retaining the central tendencies and coverage of uncertainty in future climatic conditions. This should be particularly useful during future climate change impact studies as more than twice as many climate models were reported in the fifth assessment report of IPCC compared to the previous one.

  3. An Objective Approach to Select Climate Scenarios when Projecting Species Distribution under Climate Change.

    Science.gov (United States)

    Casajus, Nicolas; Périé, Catherine; Logan, Travis; Lambert, Marie-Claude; de Blois, Sylvie; Berteaux, Dominique

    2016-01-01

    An impressive number of new climate change scenarios have recently become available to assess the ecological impacts of climate change. Among these impacts, shifts in species range analyzed with species distribution models are the most widely studied. Whereas it is widely recognized that the uncertainty in future climatic conditions must be taken into account in impact studies, many assessments of species range shifts still rely on just a few climate change scenarios, often selected arbitrarily. We describe a method to select objectively a subset of climate change scenarios among a large ensemble of available ones. Our k-means clustering approach reduces the number of climate change scenarios needed to project species distributions, while retaining the coverage of uncertainty in future climate conditions. We first show, for three biologically-relevant climatic variables, that a reduced number of six climate change scenarios generates average climatic conditions very close to those obtained from a set of 27 scenarios available before reduction. A case study on potential gains and losses of habitat by three northeastern American tree species shows that potential future species distributions projected from the selected six climate change scenarios are very similar to those obtained from the full set of 27, although with some spatial discrepancies at the edges of species distributions. In contrast, projections based on just a few climate models vary strongly according to the initial choice of climate models. We give clear guidance on how to reduce the number of climate change scenarios while retaining the central tendencies and coverage of uncertainty in future climatic conditions. This should be particularly useful during future climate change impact studies as more than twice as many climate models were reported in the fifth assessment report of IPCC compared to the previous one.

  4. Compliance with the workplace-smoking ban in the Netherlands.

    Science.gov (United States)

    Verdonk-Kleinjan, Wendy M I; Rijswijk, Pieter C P; de Vries, Hein; Knibbe, Ronald A

    2013-02-01

    In 2004 the Dutch government instituted a workplace-smoking ban. This study focuses on differences in compliance over time and between occupational sectors, and describes the background variables. Telephone interviews were conducted with company employees across industry, public and service sectors in 2004 (n=705), 2006 (n=2201) and 2008 (n=2034). The questions concerned smoking policy, aspects of awareness and motivation to implement this ban. Compliance rates increased between 2006 (83%) and 2008 (96%) after an initial stagnation in the rate of compliance between 2004 and 2006. The increase in compliance was accompanied by a less negative attitude and an increase in confidence in one's ability to comply (self-efficacy). Differences in compliance between sectors with the highest compliance (public sector) and the lowest compliance (industry) decreased from about 20% to nearly 4%. Simultaneously, in the industry there was a stronger increase for risk perception of enforcement, social influence and self-efficacy. The initial stagnation in increase of compliance might be due to the lack of a (new) coherent package of policy measures to discourage smoking. Over the entire period there was a stronger increase in compliance in the industry sector, probably due to the intensification of enforcement activities and additional policy like legislation, which might increase awareness and social support. Copyright © 2012 Elsevier Ireland Ltd. All rights reserved.

  5. Quality Assurance Project Plan for the Gas Generation Testing Program at the INEL

    International Nuclear Information System (INIS)

    1994-10-01

    The data quality objectives (DQOs) for the Program are to evaluate compliance with the limits on total gas generation rates, establish the concentrations of hydrogen and methane in the total gas flow, determine the headspace concentration of VOCs in each drum prior to the start of the test, and obtain estimates of the concentrations of several compounds for mass balance purposes. Criteria for the selection of waste containers at the INEL and the parameters that must be characterized prior to and during the tests are described. Collection of gaseous samples from 55-gallon drums of contact-handled transuranic waste for the gas generation testing is discussed. Analytical methods and calibrations are summarized. Administrative quality control measures described in this QAPjP include the generation, review, and approval of project documentation; control and retention of records; measures to ensure that personnel, subcontractors or vendors, and equipment meet the specifications necessary to achieve the required data quality for the project

  6. 30 CFR 90.207 - Compliance sampling.

    Science.gov (United States)

    2010-07-01

    ... MANDATORY HEALTH STANDARDS-COAL MINERS WHO HAVE EVIDENCE OF THE DEVELOPMENT OF PNEUMOCONIOSIS Sampling Procedures § 90.207 Compliance sampling. (a) The operator shall take five valid respirable dust samples for... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Compliance sampling. 90.207 Section 90.207...

  7. 5 CFR 900.406 - Compliance information.

    Science.gov (United States)

    2010-01-01

    ... 5 Administrative Personnel 2 2010-01-01 2010-01-01 false Compliance information. 900.406 Section... Compliance information. (a) Cooperation and assistance. OPM, to the fullest extent practicable, shall seek... at the times, and in the form and containing the information OPM may determine necessary to enable it...

  8. 49 CFR 27.121 - Compliance information.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Compliance information. 27.121 Section 27.121 Transportation Office of the Secretary of Transportation NONDISCRIMINATION ON THE BASIS OF DISABILITY IN PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Enforcement § 27.121 Compliance information. (a) Cooperation and assistance. The...

  9. Effect of the Building Act 2011 on compliance costs in Western Australia

    Directory of Open Access Journals (Sweden)

    Elizabeth Bazen

    2014-06-01

    Full Text Available  The Building Act 2011 commenced in Western Australia on 2 April 2012. It introduced private certification for design and construction compliance, and reduced fees and timeframes for local governments to issue permits. This research project assessed the effect of the Act on the time and cost of building approvals in WA, using an internet-based, self-completion survey to obtain feedback from people on their experience of the new building approvals process.   This research compared the cost of approval for 16 building projects under the new and old approvals processes. The research concluded that the new approvals process appears to be cost-neutral for the building industry as a whole. However, the cost of approval for the 11 building projects studied valued up to $1 million, particularly alterations to existing buildings, is an average of 4.0 times greater under the new approvals process.

  10. PORTFOLIO SELECTION OF INFORMATION SYSTEMS PROJECTS USING PROMETHEE V WITH C-OPTIMAL CONCEPT

    Directory of Open Access Journals (Sweden)

    Jonatas A. de Almeida

    2014-05-01

    Full Text Available This paper presents a multicriteria decision model for selecting a portfolio of information system (IS projects, which integrates strategic and organizational view within a multicriteria decision structure. The PROMETHEE V method, based on outranking relations is applied, considering the c-optimal concept in order to overcome some scaling problems found in the classical PROMETHEE V approach. Then, a procedure is proposed in order to make a final analysis of the c-optimal portfolios found as a result of using PROMETHEE V. Also, the organizational view is discussed, including some factors that may influence decision making on IS projects to be included in the portfolio, such as adding the company's strategic vision and technical aspects that demonstrate how IS contributes value to a company's business.

  11. Support as a crucial predictor of good compliance of adolescents with a chronic disease.

    Science.gov (United States)

    Kyngas, H; Rissanen, M

    2001-11-01

    The purpose of this study was to describe the factors that predict compliance among adolescents with a chronic illness. The data were collected by questionnaires from adolescents with asthma, epilepsy, juvenile rheumatoid arthritis (JRA) and insulin-dependent diabetes mellitus (IDDM). Groups of 300 adolescents with these illnesses were selected from the Finnish Social Insurance Institution's register, giving a total study series of 1200 individuals. The final response percentage was 88% (n = 1061). The data were analysed with the SPSS software. Logistic regression was used to indicate the predictors of good compliance. The compliance of adolescents with a chronic disease was predicted on the basis of support from parents, nurses, physicians and friends, as well as motivation, energy and willpower. The most powerful predictor was support from nurses. The likelihood of adolescents supported by nurses complying with health regimens was 7.28-fold compared to the adolescents who did not receive support from nurses. The next powerful predictor was energy and willpower. Adolescents who had the energy and willpower to take care of themselves complied with health regimens with a 6.69-fold likelihood compared to the adolescents who did not have energy and willpower. Adolescents who had good motivation were 5.28 times more likely to comply than the adolescents who did not have motivation. Support from parents, physicians and friends similarly predicted good compliance with health regimens.

  12. Projects management in organization on the selected example

    OpenAIRE

    A. Kania; M. Spilka; S. Griner

    2013-01-01

    Purpose: In this paper stages of project management taking into consideration many useful tools and methods were presented. The quality management in the project, the risk estimation, costs of the project realization and many others were discussed. The analysis of project management of an element using in an automotive industry was carried out.Design/methodology/approach: In this article classification of the projects was presented. The stages of project management and relations among them we...

  13. Selection of priority investment projects for the development of the Russian Arctic

    Science.gov (United States)

    Novoselov, A.; Potravny, I.; Novoselova, I.; Gassiy, V.

    2017-12-01

    In the Russian Arctic, there is currently an active process of preparation and implementation of investment projects aiming to extract natural resources, with the aim of sustainable socioeconomic development of the region. These projects are associated with the development of key zones in the Arctic and involve the exploration for and production of minerals (diamonds, gold, rare-earth metals, oil, and gas) and the development of energy and infrastructure (e.g., the Northern Sea Route). Such projects, which are often carried out in territories of traditional nature management belonging to the indigenous peoples of the North, must consider their environmental and social responsibility and the preservation of the ethnic identity and culture of indigenous peoples. The extraction of mineral deposits in the Arctic and the Far North places new demands on subsoil users, related to the preservation and development of the socio-cultural environment of the indigenous peoples of the North and to the ecological rehabilitation of the area. This article presents economic and mathematical models for selecting the optimal development project options based on the pairwise comparison of investment projects and the evaluation of indigenous peoples' preferences. We investigated the investment projects' impact on traditional territories in the Arctic, including the Republic of Sakha (Yakutia), in terms of socioeconomic and ethnological development, and environmental change. The suggested system of models can be used to assess the priority of projects supporting and developing the region in the mining corporation's area of responsibility. The proposed models are based on fuzzy set theory, which provides an effective assessment of the population's preferences for projects. Data are processed using the hierarchy analysis method and multivariate optimization calculations to determine the project sets at different funding levels. The creation of information-linked processing models is

  14. Dietary compliance in Iranian children and adolescents with celiac disease

    Directory of Open Access Journals (Sweden)

    Taghdir M

    2016-08-01

    Full Text Available Maryam Taghdir,1 Naser Honar,2 Seyed Mohammad Mazloomi,3 Mojtaba Sepandi,4 Mahkameh Ashourpour,1 Musa Salehi5 1Student Research Committee, Department of Clinical Nutrition, School of Nutrition and Food Sciences, Shiraz University of Medical Sciences, Shiraz, Iran; 2Department of Pediatric Gastroenterology and Hepatology, Shiraz University of Medical Sciences, Shiraz, Iran; 3Nutrition Research Center, Department of Food Hygiene and Quality Control, School of Nutrition and Food Sciences, Shiraz University of Medical Sciences, Shiraz, Iran; 4Department of Epidemiology and Biostatistics, Baqyiatallah University of Medical Sciences, Tehran, Iran; 5Nutrition Research Center, Department of Clinical Nutrition, School of Nutrition and Food Sciences, Shiraz University of Medical Sciences, Shiraz, Iran Introduction: Celiac disease (CD is caused due to intake of gluten, a protein component in wheat, barley, and rye. The only treatment currently available for CD is strict lifetime adherence to a gluten-free diet (GFD which is a diet that excludes wheat, barley, and rye. There is limited information on barriers to following a GFD. The present study aimed to investigate the compliance with a GFD, barriers to compliance, and the impact of compliance on the quality of life (QOL in Iranian children and adolescents suffering from CD.Methods: In this cross-sectional study, a total of 65 known cases of CD (both males and females, diagnosed in Namazi Hospital, a large referral center in south of Iran, selected by census were studied in 2014. Dietary compliance was assessed using a questionnaire. A disease-specific QOL questionnaire for children with CD (the celiac disease DUX [CDDUX] was used. Comparisons between categorical variables were performed using chi-square test.Results: Sixty-five patients, 38 females (58.5% and 27 (41.5% males, were surveyed. Mean (± standard deviation [SD] age of the respondents was 11.3 (±3.8 years. Dietary compliance was reported by

  15. Regulatory Compliance in Multi-Tier Supplier Networks

    Science.gov (United States)

    Goossen, Emray R.; Buster, Duke A.

    2014-01-01

    Over the years, avionics systems have increased in complexity to the point where 1st tier suppliers to an aircraft OEM find it financially beneficial to outsource designs of subsystems to 2nd tier and at times to 3rd tier suppliers. Combined with challenging schedule and budgetary pressures, the environment in which safety-critical systems are being developed introduces new hurdles for regulatory agencies and industry. This new environment of both complex systems and tiered development has raised concerns in the ability of the designers to ensure safety considerations are fully addressed throughout the tier levels. This has also raised questions about the sufficiency of current regulatory guidance to ensure: proper flow down of safety awareness, avionics application understanding at the lower tiers, OEM and 1st tier oversight practices, and capabilities of lower tier suppliers. Therefore, NASA established a research project to address Regulatory Compliance in a Multi-tier Supplier Network. This research was divided into three major study efforts: 1. Describe Modern Multi-tier Avionics Development 2. Identify Current Issues in Achieving Safety and Regulatory Compliance 3. Short-term/Long-term Recommendations Toward Higher Assurance Confidence This report presents our findings of the risks, weaknesses, and our recommendations. It also includes a collection of industry-identified risks, an assessment of guideline weaknesses related to multi-tier development of complex avionics systems, and a postulation of potential modifications to guidelines to close the identified risks and weaknesses.

  16. Corporate compliance: framework and implementation.

    Science.gov (United States)

    Fowler, N

    1999-01-01

    The federal government has created numerous programs to combat fraud and abuse. The government now encourages healthcare facilities to have a corporate compliance program (CCP), a plan that reduces the chances that the facility will violate laws or regulations. A CCP is an organization-wide program comprised of a code of conduct and written policies, internal monitoring and auditing standards, employee training, feedback mechanisms and other features, all designed to prevent and detect violations of governmental laws, regulations and policies. It is a system or method ensuring that employees understand and will comply with laws that apply to what they do every day. Seven factors, based on federal sentencing guidelines, provide the framework for developing a CCP. First, a facility must establish rules that are reasonably capable of reducing criminal conduct. Second, high-level personnel must oversee the compliance effort. Third, a facility must use due care in delegating authority in the compliance initiative. Fourth, standards must be communicated effectively to employees, and fifth, a facility must take reasonable steps to achieve compliance. Sixth, standards must be enforced consistently across the organization and last, standards must be modified or changed for reported concerns, to ensure they are not repeated. PROMINA Health System, Inc. in Atlanta, Ga., designed a program to meet federal guidelines. It started with a self-assessment to define its areas or risk. Next, it created the internal structure and assigned organizational responsibility for running the CCP. PROMINA then developed standards of business and professional conduct, established vehicles of communication and trained employees on the standards. Finally, it continues to develop evidence of the program's effectiveness by monitoring and documenting its compliance activities.

  17. 14 CFR 417.23 - Compliance monitoring.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Compliance monitoring. 417.23 Section 417... Compliance monitoring. (a) A launch operator must allow access by, and cooperate with, Federal officers or... launch operator must provide the FAA with a console for monitoring the progress of the countdown and...

  18. 45 CFR 80.6 - Compliance information.

    Science.gov (United States)

    2010-10-01

    ... 45 Public Welfare 1 2010-10-01 2010-10-01 false Compliance information. 80.6 Section 80.6 Public... THE CIVIL RIGHTS ACT OF 1964 § 80.6 Compliance information. (a) Cooperation and assistance. The... reports at such times, and in such form and containing such information, as the responsible Department...

  19. Compliance to two city convenience store ordinance requirements.

    Science.gov (United States)

    Chaumont Menéndez, Cammie K; Amandus, Harlan E; Wu, Nan; Hendricks, Scott A

    2016-04-01

    Robbery-related homicides and assaults are the leading cause of death in retail businesses. Robbery reduction approaches focus on compliance to Crime Prevention Through Environmental Design (CPTED) guidelines. We evaluated the level of compliance to CPTED guidelines specified by convenience store safety ordinances effective in 2010 in Dallas and Houston, Texas, USA. Convenience stores were defined as businesses less than 10 000 square feet that sell grocery items. Store managers were interviewed for store ordinance requirements from August to November 2011, in a random sample of 594 (289 in Dallas, 305 in Houston) convenience stores that were open before and after the effective dates of their city's ordinance. Data were collected in 2011 and analysed in 2012-2014. Overall, 9% of stores were in full compliance, although 79% reported being registered with the police departments as compliant. Compliance was consistently significantly higher in Dallas than in Houston for many requirements and by store type. Compliance was lower among single owner-operator stores compared with corporate/franchise stores. Compliance to individual requirements was lowest for signage and visibility. Full compliance to the required safety measures is consistent with industry 'best practices' and evidence-based workplace violence prevention research findings. In Houston and Dallas compliance was higher for some CPTED requirements but not the less costly approaches that are also the more straightforward to adopt. Published by the BMJ Publishing Group Limited. For permission to use (where not already granted under a licence) please go to http://www.bmj.com/company/products-services/rights-and-licensing/

  20. 42 CFR 137.365 - What is the procedure for the Secretary's review and approval of project planning and design...

    Science.gov (United States)

    2010-10-01

    ... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the...-Governance Tribe? (a) The Secretary shall review and approve planning documents to ensure compliance with... design documents for general compliance with requirements of the construction project agreement. (b) The...

  1. Research and Development Project Selection Methods at the Air Force Wright Aeronautical Laboratories.

    Science.gov (United States)

    1985-09-01

    personal and telephone interviews. Ten individuals from each of the four AFWAL Laboratories were interrviewed. The results illustrated that few of the...680). Aaker and Tyebee. 1978. The authors constructed a model that dealt with the selection of interdependent R&D projects. The model covers three...of this research effort. Scope * The data collection method used in this study consisted of a combination of personal and telephone interviews. The

  2. Report: ECHO Data Quality Audit – Phase I Results: The Integrated Compliance Information System Needs Security Controls to Protect Significant Non-Compliance Data

    Science.gov (United States)

    Report #09-P-0226, August 31, 2009. End users of the Permit Compliance System and Integrated Compliance Information System National Pollutant Discharge Elimination System can override the Significant Non-Compliance data field without more access controls.

  3. 22 CFR 141.5 - Compliance information.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Compliance information. 141.5 Section 141.5... DEPARTMENT OF STATE-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 § 141.5 Compliance information... such information, as a responsible Departmental official or his designee may determine to be necessary...

  4. 49 CFR 21.9 - Compliance information.

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Compliance information. 21.9 Section 21.9 Transportation Office of the Secretary of Transportation NONDISCRIMINATION IN FEDERALLY-ASSISTED PROGRAMS OF THE DEPARTMENT OF TRANSPORTATION-EFFECTUATION OF TITLE VI OF THE CIVIL RIGHTS ACT OF 1964 § 21.9 Compliance information. (a) Cooperation and...

  5. Influence of Self-Efficacy on Compliance to Workplace Exercise

    DEFF Research Database (Denmark)

    Pedersen, Mette Merete; Zebis, Mette K; Jørgensen, Henning Langberg

    2013-01-01

    the influence of exercise-specific self-efficacy on compliance to workplace physical exercise. PURPOSE: To determine the influence of exercise-specific self-efficacy on compliance to specific strength exercises during working hours for laboratory technicians. METHODS: We performed a cluster...... of compliance to exercises during 20 weeks, but found self-efficacy to be a predictor of compliance in a private sector setting. Workplace-specific differences might be present and should be taken into account....

  6. Seismic safety margins research program. Phase I final report - Plant/site selection and data collection (Project I)

    International Nuclear Information System (INIS)

    Chuang, T.Y.

    1981-07-01

    Project I of Phase I of the Seismic Safety Margins Research Program (SSMRP) comprised two parts: the selection of a representative nuclear power plant/site for study in Phase I and the collection of data needed by the other SSMRP projects. Unit 1 of the Zion Nuclear Power Plant in Zion, Illinois, was selected for the SSMRP Phase I studies. Unit 1 of the Zion plant has been validated as a good choice for the Phase I study plant. Although no single nuclear power plant can represent all such plants equally well, selection criteria were developed to maximize the generic implications of Phase I of the SSMRP. On the basis of the selection criteria, the Zion plant and its site were found to be reasonably representative of operating and future plants with regard to its nuclear steam supply system; the type of containment structure (prestressed concrete); its electrical capacity (1100 MWe); its location (the Midwest); the peak seismic acceleration used for design (0.17g); and the properties of the underlying soil (the low-strain shear-wave velocity is 1650 ft/s in a 50- to 100-ft-thick layer of soil overlying sedimentary bedrock). (author)

  7. Adaptive Equalizer Using Selective Partial Update Algorithm and Selective Regressor Affine Projection Algorithm over Shallow Water Acoustic Channels

    Directory of Open Access Journals (Sweden)

    Masoumeh Soflaei

    2014-01-01

    Full Text Available One of the most important problems of reliable communications in shallow water channels is intersymbol interference (ISI which is due to scattering from surface and reflecting from bottom. Using adaptive equalizers in receiver is one of the best suggested ways for overcoming this problem. In this paper, we apply the family of selective regressor affine projection algorithms (SR-APA and the family of selective partial update APA (SPU-APA which have low computational complexity that is one of the important factors that influences adaptive equalizer performance. We apply experimental data from Strait of Hormuz for examining the efficiency of the proposed methods over shallow water channel. We observe that the values of the steady-state mean square error (MSE of SR-APA and SPU-APA decrease by 5.8 (dB and 5.5 (dB, respectively, in comparison with least mean square (LMS algorithm. Also the families of SPU-APA and SR-APA have better convergence speed than LMS type algorithm.

  8. On the quality of compliance mechanisms in the Kyoto Protocol

    International Nuclear Information System (INIS)

    Nentjes, Andries; Klaassen, Ger

    2004-01-01

    In this paper we evaluate the compliance mechanisms in the Kyoto Protocol as agreed at the seventh Conference of Parties to the United Nations Framework Convention on Climate Change (UNFCCC) in Marrakech. We differ from the literature since we concentrate on the complete set of compliance rules agreed in Marrakech and, as a new element, we systematically discuss these compliance incentives in conjunction with the implicit compliance incentives: reputation protection, emission trading and banking. We conclude that effectiveness and efficiency go hand in hand for all explicit and implicit compliance incentives except one--emission trading. Trading improves efficiency but this can also occur at the cost of increasing non-compliance

  9. 50 CFR 86.61 - What process does the Service use to select projects for grants?

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What process does the Service use to....61 What process does the Service use to select projects for grants? The Service's Division of Federal... SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION...

  10. Role of Renewable Energy Certificates in Developing New Renewable Energy Projects

    Energy Technology Data Exchange (ETDEWEB)

    Holt, E.; Sumner, J.; Bird, L.

    2011-06-01

    For more than a decade, renewable energy certificates (RECs) have grown in use, becoming a common way to track ownership of the renewable and environmental attributes of renewable electricity generation. In recent years, however, questions have risen about the role RECs play in the decision to build new renewable energy projects. Information from a variety of market participants suggests that the importance of RECs in building new projects varies depending on a number of factors, including electricity market prices, the cost-competitiveness of the project, the presence or absence of public policies supportive of new projects, contract duration, and the perspective of different market participants. While there is no single answer to the role that RECs play, there are situations in which REC revenues are essential to project economics, as well as some where REC revenues may have little impact. To strengthen the role RECs play in both compliance and voluntary markets, there are a number of options that could be considered. In compliance markets, lawmakers or regulators would have to adopt measures that strengthen the role of RECs in the development of new projects, while in voluntary markets, it would be up to program leaders and market participants themselves to implement measures.

  11. The Mesaba Energy Project: Clean Coal Power Initiative, Round 2

    Energy Technology Data Exchange (ETDEWEB)

    Stone, Richard; Gray, Gordon; Evans, Robert

    2014-07-31

    The Mesaba Energy Project is a nominal 600 MW integrated gasification combine cycle power project located in Northeastern Minnesota. It was selected to receive financial assistance pursuant to code of federal regulations (?CFR?) 10 CFR 600 through a competitive solicitation under Round 2 of the Department of Energy?s Clean Coal Power Initiative, which had two stated goals: (1) to demonstrate advanced coal-based technologies that can be commercialized at electric utility scale, and (2) to accelerate the likelihood of deploying demonstrated technologies for widespread commercial use in the electric power sector. The Project was selected in 2004 to receive a total of $36 million. The DOE portion that was equally cost shared in Budget Period 1 amounted to about $22.5 million. Budget Period 1 activities focused on the Project Definition Phase and included: project development, preliminary engineering, environmental permitting, regulatory approvals and financing to reach financial close and start of construction. The Project is based on ConocoPhillips? E-Gas? Technology and is designed to be fuel flexible with the ability to process sub-bituminous coal, a blend of sub-bituminous coal and petroleum coke and Illinois # 6 bituminous coal. Major objectives include the establishment of a reference plant design for Integrated Gasification Combined Cycle (?IGCC?) technology featuring advanced full slurry quench, multiple train gasification, integration of the air separation unit, and the demonstration of 90% operational availability and improved thermal efficiency relative to previous demonstration projects. In addition, the Project would demonstrate substantial environmental benefits, as compared with conventional technology, through dramatically lower emissions of sulfur dioxide, nitrogen oxides, volatile organic compounds, carbon monoxide, particulate matter and mercury. Major milestones achieved in support of fulfilling the above goals include obtaining Site, High Voltage

  12. Estimation of volatility of selected oil production projects

    International Nuclear Information System (INIS)

    Costa Lima, Gabriel A.; Suslick, Saul B.

    2006-01-01

    In oil project valuation and investment decision-making, volatility is a key parameter, but it is difficult to estimate. From a traditional investment viewpoint, volatility reduces project value because it increases its discount rate via a higher risk premium. Contrarily, according to the real-option pricing theory, volatility may aggregate value to the project, since the downside potential is limited whereas the upside is theoretically unbounded. However, the estimation of project volatility is very complicated since there is not a historical series of project values. In such cases, many analysts assume that oil price volatility is equal to that of project. In order to overcome such problems, in this paper an alternative numerical method based on present value of future cash flows and Monte Carlo simulation is proposed to estimate the volatility of projects. This method is applied to estimate the volatility of 12 deep-water offshore oil projects considering that oil price will evolve according to one of two stochastic processes: Geometric Brownian Motion and Mean-Reverting Motion. Results indicate that the volatility of commodity usually undervalue that of project. For the set of offshore projects analyzed in this paper, project volatility is at least 79% higher than that of oil prices and increases dramatically in those cases of high capital expenditures and low price. (author)

  13. Notification: EPA’s Compliance with Statement of Federal Financial Accounting Standards No. 47 and Treasury Financial Manual, Part 2, Chapter 4700

    Science.gov (United States)

    Project #OA&E-FY18-0249, June 6, 2018. The OIG plans to begin preliminary research on the EPA’s compliance with the Statement of Federal Financial Accounting Standards No. 47: Reporting Entity; and Treasury Financial Manual, Part 2, Chapter 4700

  14. Increased arterial compliance in decompensated cirrhosis

    DEFF Research Database (Denmark)

    Henriksen, Jens Henrik Sahl; Møller, Søren; Schifter, S

    1999-01-01

    of the vasodilator, calcitonin gene-related peptide (CGRP) and mean arterial blood pressure (MAP). METHODS: Arterial compliance (COMPart=deltaV/deltaP) was determined as the stroke volume relative to pulse pressure (i.e. systolic minus diastolic blood pressure) during a haemodynamic evaluation of portal hypertension......BACKGROUND/AIMS: In patients with cirrhosis, the systemic circulation is hyperdynamic with low arterial blood pressure and reduced systemic vascular resistance. The present study was undertaken to estimate the compliance of the arterial tree in relation to severity of cirrhosis, circulating level...... of CGRP (r=0.34, parterial compliance in cirrhosis is directly related to the severity of the disease and to the elevated level of circulating vasodilator peptide CGRP, and inversely related...

  15. Integration of Environmental Compliance at the Savannah River Site - 13024

    International Nuclear Information System (INIS)

    Hoel, David; Griffith, Michael

    2013-01-01

    The Savannah River Site (SRS) is a large federal installation hosting diverse missions and multiple organizations with competing regulatory needs. Accordingly, there was a need to integrate environmental compliance strategies to ensure the consistent flow of information between Department of Energy-Savannah River (DOE-SR), the regulatory agencies and other interested parties. In order to meet this objective, DOE and major SRS contractors and tenants have committed to a strategy of collaboratively working together to ensure that a consistent, integrated, and fully coordinated approach to environmental compliance and regulator relationships is maintained. DOE-SR and Savannah River Nuclear Solutions, LLC, the SRS management and operations contractor, have established an environmental compliance integration process that provides for the consistent flow down of requirements to projects, facilities, SRS contractors, and subcontractors as well as the upward flow of information to assist in the early identification and resolution of environmental regulatory issues and enhancement of compliance opportunities. In addition, this process strongly fosters teamwork to collaboratively resolve complex regulatory challenges, promote pollution prevention and waste minimization opportunities to advance site missions in a manner that balances near-term actions with the long-term site vision, while being protective of human health and the environment. Communication tools are being utilized, some with enhancements, to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. SRS internal regulatory integration is accomplished through a variety of informational exchange forums (e.g., Challenges, Opportunities and Resolution (COR) Team, DOE's Joint Site Regulatory Integration Team, and the Senior Environmental Managers Council (SEMC)). SRS communications and problem-solving with the regulatory agencies have been enhanced through formation of an

  16. Integration of Environmental Compliance at the Savannah River Site - 13024

    Energy Technology Data Exchange (ETDEWEB)

    Hoel, David [United States Department of Energy - Savannah River Operations Office (United States); Griffith, Michael [Savannah River Nuclear Solutions, LLC (United States)

    2013-07-01

    The Savannah River Site (SRS) is a large federal installation hosting diverse missions and multiple organizations with competing regulatory needs. Accordingly, there was a need to integrate environmental compliance strategies to ensure the consistent flow of information between Department of Energy-Savannah River (DOE-SR), the regulatory agencies and other interested parties. In order to meet this objective, DOE and major SRS contractors and tenants have committed to a strategy of collaboratively working together to ensure that a consistent, integrated, and fully coordinated approach to environmental compliance and regulator relationships is maintained. DOE-SR and Savannah River Nuclear Solutions, LLC, the SRS management and operations contractor, have established an environmental compliance integration process that provides for the consistent flow down of requirements to projects, facilities, SRS contractors, and subcontractors as well as the upward flow of information to assist in the early identification and resolution of environmental regulatory issues and enhancement of compliance opportunities. In addition, this process strongly fosters teamwork to collaboratively resolve complex regulatory challenges, promote pollution prevention and waste minimization opportunities to advance site missions in a manner that balances near-term actions with the long-term site vision, while being protective of human health and the environment. Communication tools are being utilized, some with enhancements, to ensure appropriate information is communicated to all levels with environmental responsibility at SRS. SRS internal regulatory integration is accomplished through a variety of informational exchange forums (e.g., Challenges, Opportunities and Resolution (COR) Team, DOE's Joint Site Regulatory Integration Team, and the Senior Environmental Managers Council (SEMC)). SRS communications and problem-solving with the regulatory agencies have been enhanced through formation

  17. [Compliance with process indicators in people with type 2 diabetes and linking incentives in Primary Care].

    Science.gov (United States)

    Pascual de la Pisa, Beatriz; Márquez Calzada, Cristina; Cuberos Sánchez, Carla; Cruces Jiménez, José Miguel; Fernández Gamaza, Manuel; Martínez Martínez, María Isabel

    2015-03-01

    Pay-for-performance programs to improve the quality of health care are extending gradually, particularly en Primary Health Care. Our aim was to explore the relationship between the degree of compliance with the process indicators (PrI) of type 2 diabetes (T2DM) in Primary Care and linkage to incentives. Cross-sectional, descriptive, observational study. Six Primary Health Care centers in Seville Aljarafe District randomly selected and stratified by population size. From 3.647 adults included in Integrated Healthcare Process of T2DM during 2008, 366 patients were included according sample size calculation by stratified random sampling. PrI: eye and feet examination, glycated hemoglobin, lipid profile, microalbuminuria and electrocardiogram. Confounding: Age, gender, characteristics town for patients and professional variables. The mean age was 66.36 years (standard deviation [DE]: 11,56); 48.9% were women. PrI with better compliance were feet examination, glycated hemoglobin and lipid profile (59.6%, 44.3% and 44%, respectively). 2.7% of patients had simultaneous compliance of the six PrI and 11.74% of patients three PrI linkage to incentives. Statistical association was observed in the compliance of the PrI incentives linked or not (P=.001). The degree of compliance with the PrI for screening chronic complications of T2DM is mostly low but this was higher on indicators linked to incentives. Copyright © 2013 Elsevier España, S.L.U. All rights reserved.

  18. Project characteristics monitoring report: BWIP (Basalt Waste Isolation Program) repository project

    Energy Technology Data Exchange (ETDEWEB)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs.

  19. Project characteristics monitoring report: BWIP [Basalt Waste Isolation Program] repository project

    International Nuclear Information System (INIS)

    Friedli, E.A.; Herborn, D.I.; Taylor, C.D.; Tomlinson, K.M.

    1988-03-01

    This monitoring report has been prepared to show compliance with provisions of the Nuclear Waste Policy Act of 1982 (NWPA) and to provide local and state government agencies with information concerning the Basalt Waste Isolation Program (BWIP). This report contains data for the time period May 26, 1986 to February 1988. The data include employment figures, salaries, project purchases, taxes and fees paid, worker survey results, and project closedown personal interview summaries. This information has become particularly important since the decision in December 1987 to stop all BWIP activities except those for site reclamation. The Nuclear Waste Policy Amendments Act of 1987 requires nonreclamation work at the Hanford Site to stop as of March 22, 1988. 7 refs., 6 figs., 28 tabs

  20. Compliance of amblyopic patients with occlusion therapy: A pilot study

    Directory of Open Access Journals (Sweden)

    Sana Al-Zuhaibi

    2009-01-01

    Materials and Methods: A total of 31 families with a child (aged 2-12 years, undergoing unilateral amblyopia treatment at the pediatric ophthalmology clinic of Sultan Qaboos University Hospital, Oman, were recruited for this one month study. Parents were interviewed and completed a closed-ended questionnaire. Clinical data including, visual acuity, refraction, diagnosis and treatment, for each patient was collected from the hospital chart and was entered in a data collection sheet. Compliance with occlusion therapy was assessed by self-report accounts of parents and was graded into good, partial, or poor. Association between various factors and degree of compliance was studied using logistic regression modeling. Results: Only 14 (45% patients showed good compliance to occlusion therapy. 17 (55% patients were noncompliant. Improvement in visual acuity strongly correlated with compliance to patching (P = 0.008. Other variables that were studied included, age at onset of therapy; gender; degree of amblyopia; type of amblyopia; use of glasses; and compliance with glasses. These did not emerge as significant predictors of compliance. All but one family with poor compliance stated that the main challenge in following the recommendation to patch for requisite hours was in getting their child to cooperate. Only in one instance, the family cited nonavailability of patches as the main hindrance to compliance. 10/31 (32% families expressed a desire for more information and 18/31 (58% parents did not understand that amblyopia meant decreased vision. Conclusion: Poor compliance is a barrier to successful amblyopia therapy in our practice. Improvement in visual acuity is associated with better compliance with patching. Parents find it difficult to comprehend and retain verbal explanations of various components regarding occlusion therapy for amblyopia. Future study with a larger sample of patients is recommended to investigate the factors affecting compliance with amblyopia

  1. Revised ground-water monitoring compliance plan for the 183-H Solar Evaporation Basins

    International Nuclear Information System (INIS)

    1986-09-01

    This document contains ground-water monitoring plans for a mixed waste storage facility located on the Hanford Site in southeastern Washington State. This facility has been used since 1973 for storage of mixed wastes, which contain both chemicals and radionuclides. The ground-water monitoring plans presented here represent revision and expansion of an effort in June 1985. At that time, a facility-specific monitoring program was implemented at the 183-H Basins as part of the regulatory compliance effort being conducted on the Hanford Site. This monitoring program was based on the ground-water monitoring requirements for interimstatus facilities, which are those facilities that do not yet have final permits, but are authorized to continue interim operations while engaged in the permitting process. The program initially implemented for the 183-H Basins was designed to be an alternate program, which is required instead of the standard detection program when a facility is known or suspected to have contaminated the ground water in the uppermost aquifer. This effort, named the RCRA Compliance Ground-Water Monitoring Project for the 183-H Basins, was implemented. A supporting project involving ground-water flow modeling for the area surrounding the 183-H Basins was also initiated during 1985. Those efforts and the results obtained are described in subsequent chapters of this document. 26 refs., 55 figs., 14 tabs

  2. 242-A evaporator quality assurance project plan: Revision 1

    International Nuclear Information System (INIS)

    Tucker, B.J.

    1994-01-01

    The scope of this quality assurance project plan (Plan) is sampling and analytical services including, but not limited to, sample receipt, handling and storage, analytical measurements, submittal of data deliverables, archiving selected portions of samples, returning unneeded sample material to Westinghouse Hanford Company (WHC), and/or sample disposal associated with candidate feed samples and process condensate compliance samples. Sampling and shipping activities are also included within the scope. The purpose of this project is to provide planning, implementation, and assessment guidance for achieving established data quality objectives measurement parameters. This Plan requires onsite and offsite laboratories to conform to that guidance. Laboratory conformance will help ensure that quality data are being generated and therefore, that the 242-A evaporator is operating in a safe and compliant manner. The 242-A evaporator feed stream originates from double-shell tanks (DSTs) identified as candidate feed tanks. The 242-A evaporator reduces the volume of aqueous waste contained in DSTs by boiling off water and sending it to the Liquid Effluent Retention Facility (LERF) storage basin before further treatment. The slurry product is returned to DSTs. Evaporation results in considerable savings by reducing the volume of mixed waste for disposal

  3. Problematika compliance ve vybraném podniku

    OpenAIRE

    Kalová, Kristýna

    2009-01-01

    My bachelor work deals implementation of Compliance in real business companies. In this work is explained the idea of Compliance, corporate social responsibility, environmental policy and term of Stakeholders. On the frequent examples are shown methods of enterprise corruption.

  4. Lab-Scale CO2 Capture Studies and Selection of most Promising Sorbent. CAPHIGAS Project Tasks Report. Years 2010-2011

    International Nuclear Information System (INIS)

    Marano, M.; Torreiro, Y.

    2012-01-01

    In this report the main activities carried out within the CAPHIGAS Project, ref. ENE2009-08002 financed by the Spanish Ministry of Science and Innovation for the first two years are reported. The aim of the project is the development of a hybrid system WGS-adsorbent-membrane for the separation of CO 2 with H 2 production and this report summarises the most relevant results obtained on tasks L-1 and L-2 which refer to the selection, characterisation and study at laboratory scale of different sorbent materials to select those more promising for the hybrid system proposed. (Author) 55 refs.

  5. Managing business compliance using model-driven security management

    Science.gov (United States)

    Lang, Ulrich; Schreiner, Rudolf

    Compliance with regulatory and governance standards is rapidly becoming one of the hot topics of information security today. This is because, especially with regulatory compliance, both business and government have to expect large financial and reputational losses if compliance cannot be ensured and demonstrated. One major difficulty of implementing such regulations is caused the fact that they are captured at a high level of abstraction that is business-centric and not IT centric. This means that the abstract intent needs to be translated in a trustworthy, traceable way into compliance and security policies that the IT security infrastructure can enforce. Carrying out this mapping process manually is time consuming, maintenance-intensive, costly, and error-prone. Compliance monitoring is also critical in order to be able to demonstrate compliance at any given point in time. The problem is further complicated because of the need for business-driven IT agility, where IT policies and enforcement can change frequently, e.g. Business Process Modelling (BPM) driven Service Oriented Architecture (SOA). Model Driven Security (MDS) is an innovative technology approach that can solve these problems as an extension of identity and access management (IAM) and authorization management (also called entitlement management). In this paper we will illustrate the theory behind Model Driven Security for compliance, provide an improved and extended architecture, as well as a case study in the healthcare industry using our OpenPMF 2.0 technology.

  6. Levels and drivers of fishers' compliance with marine protected areas

    Directory of Open Access Journals (Sweden)

    Adrian Arias

    2015-12-01

    Full Text Available Effective conservation depends largely on people's compliance with regulations. We investigate compliance through the lens of fishers' compliance with marine protected areas (MPAs. MPAs are widely used tools for marine conservation and fisheries management. Studies show that compliance alone is a strong predictor of fish biomass within MPAs. Hence, fishers' compliance is critical for MPA effectiveness. However, there are few empirical studies showing what factors influence fishers' compliance with MPAs. Without such information, conservation planners and managers have limited opportunities to provide effective interventions. By studying 12 MPAs in a developing country (Costa Rica, we demonstrate the role that different variables have on fishers' compliance with MPAs. Particularly, we found that compliance levels perceived by resource users were higher in MPAs (1 with multiple livelihoods, (2 where government efforts against illegal fishing were effective, (3 where fishing was allowed but regulated, (4 where people were more involved in decisions, and (5 that were smaller. We also provide a novel and practical measure of compliance: a compound variable formed by the number illegal fishers and their illegal fishing effort. Our study underlines the centrality of people's behavior in nature conservation and the importance of grounding decision making on the social and institutional realities of each location.

  7. ETHICS AND COMPLIANCE IN BUSINESS

    Directory of Open Access Journals (Sweden)

    ANDREESCU Nicoleta Alina

    2015-05-01

    Full Text Available In this paper, we have studied the evolution of the business ethics concept through the prism of definitions from some renowned authors in the field and through the approach model of the business ethics and by implementing it in the company level. We have found out that in the last 40 years this concept has evolved from a theoretical aspect, as well as a practical one. Companies are motivated to implement ethics and compliance programs in business so that they can manage the changes that come from society. If, until recently, all that mattered for a company was profit, in the last decades, the situation changed. In order to develop a durable business, it is essential to have a good reputation. Owning and implementing an ethics and compliance program in business has become an imperative for companies, regardless of their activity sector. The role of the compliance department becomes more pregnant in each company: the employees need safety, the existence of communication lines provides comfort. From the partners in business’ point of view, owning such a program is a necessity, a condition, and not conforming to the principles of business ethics can lead to the isolation of the company. The ethics and compliance programs in business are instruments that protect the company by implementing certain proactive identification mechanisms that ensure the development of an ethical organizational culture.

  8. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  9. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  10. Selective elimination of intracortically projecting neurons of the rat neocortex by prenatal x-irradiation

    International Nuclear Information System (INIS)

    Jensen, K.F.

    1981-01-01

    The development of new racing methods has suggested that there are species differences in the extent of the contribution of the different layers of the neocortex to the callosal projection. The present investigation has utilized prenatal x-irradiation to selectively eliminate the late forming neurons of the supragranular layers of the rat neocortex. The reduction in the neuronal population of the supragranular layers closely parallels the reduction in the corpus callosum. These results indicate that the primary source of neurons of the callosal projection, are the late forming neurons of the supragranular layers. Thus, the current results suggest that low dose prenatal x-irradiation may be used to evaluate important developmental events in the formation of neocortical circuitry

  11. 24 CFR 990.290 - Compliance with asset management requirements.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Compliance with asset management... URBAN DEVELOPMENT THE PUBLIC HOUSING OPERATING FUND PROGRAM Asset Management § 990.290 Compliance with asset management requirements. (a) A PHA is considered in compliance with asset management requirements...

  12. Recertification Project Plan

    International Nuclear Information System (INIS)

    2001-01-01

    The Waste Isolation Pilot Plant's (WIPP) Recertification Project was established to meet the requirement placed in the WIPP Land Withdrawal Act (LWA) to demonstrate WIPP's continued compliance with the Environmental Protection Agency's (EPA) disposal regulations at five-year intervals. This plan delineates the end goal of the effort, sets out interim goals, and offers up guiding assumptions. In general, it sets the overall direction for a highly complex and interdependent set of tasks leading to recertification of the repository in the spring of 2004. In addition, this plan establishes the institutional roles and responsibilities of WIPP project participants in the recertification effort and lays out a high-level schedule for producing the Compliance Recertification Application (CRA). Detailed plans from each organization supporting this project have been included with this document as attachments. Each participant plan provides significantly more detail with descriptions of activities that are designed to ensure a successful outcome. Woven throughout this plan are the elements of guidance and direction gained from technical exchanges with EPA managers and staff. An important principle on which this plan is built is that the process of recertification will not involve modification to the certification baseline, nor will it involve rule making of any kind. Only changes previously approved by the EPA will be detailed in the CRA. EPA-approved changes to the WIPP certification will be accepted through modification or will be approved through the annual change reporting process. For any compliance areas that have not changed since the submission of the Compliance Certification Application(CCA), these will merely be incorporated in the CRA by reference. The CRA will cover all information since the October 1996 submittal of the CCA. A second major principle on which this plan is built stems from the EPA WIPP Recertification Guidance. That guidance makes it clear that, if

  13. Identification and selection of cases and controls in the Pneumonia Etiology Research for Child Health project

    NARCIS (Netherlands)

    Deloria-Knoll, Maria; Feikin, Daniel R.; Scott, J. Anthony G.; O'Brien, Katherine L.; DeLuca, Andrea N.; Driscoll, Amanda J.; Levine, Orin S.; Black, Robert E.; Bhutta, Zulfiqar A.; Campbell, Harry; Cherian, Thomas; Crook, Derrick W.; de Jong, Menno D.; Dowell, Scott F.; Graham, Stephen M.; Klugman, Keith P.; Lanata, Claudio F.; Madhi, Shabir A.; Martin, Paul; Nataro, James P.; Piazza, Franco M.; Qazi, Shamim A.; Zar, Heather J.; Baggett, Henry C.; Brooks, W. Abdullah; Chipeta, James; Ebruke, Bernard; Endtz, Hubert P.; Groome, Michelle; Hammitt, Laura L.; Howie, Stephen R. C.; Kotloff, Karen; Maloney, Susan A.; Moore, David; Otieno, Juliet; Seidenberg, Phil; Tapia, Milagritos; Thamthitiwat, Somsak; Thea, Donald M.; Zaman, Khaleque

    2012-01-01

    Methods for the identification and selection of patients (cases) with severe or very severe pneumonia and controls for the Pneumonia Etiology Research for Child Health (PERCH) project were needed. Issues considered include eligibility criteria and sampling strategies, whether to enroll hospital or

  14. Formulary considerations in selection of beta-blockers.

    Science.gov (United States)

    Yedinak, K C

    1993-08-01

    Selection of beta-adrenergic blockers for formulary addition can be a difficult task, especially with the increasing availability of new beta-blockers, as well as the numerous differences in pharmacodynamic and pharmacokinetic properties of currently available agents. Nevertheless, appropriate evaluation of the important characteristics of beta-blockers should allow selection of the most cost-effective agents for formulary addition. Most importantly, differences in efficacy, product formulation and cost should be carefully considered when making formulary decisions. Notably, evidence from clinical trials indicates differences in efficacy among beta-blockers for post-myocardial infarction prophylaxis, situational anxiety, essential tremor, thyrotoxicosis, migraine prophylaxis and prevention of bleeding associated with oesophageal varices. For many clinical situations, it is also important to select an effective agent that is available in both an oral and intravenous formulation, especially for cardioprotection after acute myocardial infarction and for use in supraventricular arrhythmias. In addition, availability of sustained release products and generic formulations should be considered for their potential to increase compliance and decrease cost, respectively. Comparative drug costs, as well as costs associated with decreased compliance, should also be carefully evaluated. Differences in beta-receptor selectivity, duration of action and presence of intrinsic sympathomimetic activity (ISA) are also important considerations in the selection of beta-blockers for formulary consideration. Although degree of selectivity is relative, beta 1-selective agents may be less likely to induce bronchospasm in patients with chronic obstructive pulmonary disease (COPD) and may be less likely to affect glucose homeostasis in patients with diabetes mellitus. Duration of action of a beta-blocker is an important consideration for evaluation of efficacy throughout the recommended

  15. Knowledge, opinions and compliance related to the 100% smoke-free law in hospitality venues in Kampala, Uganda: cross-sectional results from the KOMPLY Project

    OpenAIRE

    Gravely, Shannon; Nyamurungi, Kellen Namusisi; Kabwama, Steven Ndugwa; Okello, Gabriel; Robertson, Lindsay; Heng, Kelvin Khow Chuan; Ndikum, Achiri Elvis; Oginni, Adeniyi Samuel; Rusatira, Jean Christophe; Kakoulides, Socrates; Huffman, Mark D; Yusuf, Salim; Bianco, Eduardo

    2018-01-01

    Objective This study evaluated knowledge, opinions and compliance related to Uganda’s comprehensive smoke-free law among hospitality venues in Kampala Uganda. Design This multi-method study presents cross-sectional findings of the extent of compliance in the early phase of Uganda’s comprehensive smoke-free law (2 months postimplementation; pre-enforcement). Setting Bars, pubs and restaurants in Kampala Uganda. Procedure and participants A two-stage stratified cluster sampling procedure was us...

  16. Patient compliance and effect of orthopaedic shoes

    DEFF Research Database (Denmark)

    Philipsen, A B; Ellitsgaard, N; Krogsgaard, M R

    1999-01-01

    Orthopaedic shoes are individually handmade after a prescription from an orthopaedic surgeon, hence relatively expensive. Bad compliance is mentioned in the literature but not investigated. In order to evaluate patient compliance and the effect of orthopaedic shoes, 85 patients who were prescribed...

  17. Electronic compliance monitoring of topical treatment after ophthalmic surgery.

    Science.gov (United States)

    Hermann, Manuel Marcel; Ustündag, Can; Diestelhorst, Michael

    2010-08-01

    The success of many medical treatments is built on compliance. Electronic monitoring is the most accurate tool to quantify compliance by measuring adherence. In order to assess the efficiency of a recently introduced miniature monitoring device for eye drop application, we evaluated adherence in ophthalmic patients undergoing post-operative short-term topical treatment. This pilot study enrolled 30 outpatients (mean age 61.8 +/- 18.5 years) after cataract (n = 24) and glaucoma filtration surgery (n = 6) applying fixed-combination eye drops containing prednisolone and gentamicin five times daily for 2 weeks. Patients received eye drops in conventional bottles each equipped with a miniature monitoring device recording events of application. Two patients failed to bring back the monitoring device; therefore data collected from only 28 patients could be examined. Data showed highly variable results with a mean dose compliance of 50.2%. Dose compliance was below 25% in approximately one out of five patients. Four cataract patients, but no glaucoma patient, discontinued therapy prematurely. The observed mean dosage interval was calculated for each patient and ranged 4.6-19.7 h. Thirty percent of analysed dosage intervals exceeded 12.0 h. Different patterns of compliance behaviour-like early non-persistence, drug holiday and low treatment frequency could be identified and illustrated using electronic data. Age or gender did not significantly influence compliance rates. Our pilot study demonstrates successful electronic compliance monitoring using a technology capable of continuous data recording over weeks of treatment. The low compliance rate for a relevant part of the patients demonstrates the necessity to study and improve compliance in ophthalmology. In future, new application methods and electronic application devices may improve treatment response in eye care.

  18. Study of decision framework of wind farm project plan selection under intuitionistic fuzzy set and fuzzy measure environment

    International Nuclear Information System (INIS)

    Wu, Yunna; Geng, Shuai; Xu, Hu; Zhang, Haobo

    2014-01-01

    Highlights: • Experts’ opinions are expressed by using the intuitionistic fuzzy values. • Fuzzy measure is used to solve the dependence problem of criteria. • The compensatory problem of performance scores is reasonably processed. - Abstract: Project selection plays an important role in the entire life cycle of wind farm project and the multi-criteria decision making (MCDM) methods are very important in the whole wind farm project plan selection process. There are problems in the present MCDM methods decrease evaluation quality of the wind farm project plans: first, the information loss exists in the wind farm project plan evaluation process. Second, it is difficult to satisfy the independent assumption of the multi-criteria decision making methods used in the wind farm project plan evaluation in fact. Third, the compensatory problem of performance scores of the wind farm project plans is processed unreasonably. Hence the innovation points of this paper are as follows: first, the intuitionistic fuzzy numbers are used instead of fuzzy numbers or numerical values to reflect the experts’ intuitive preferences to decrease the probability of information loss; second, the fuzzy measure is used to rate the important degrees of criteria in order to avoid the independent assumption and to increase the reasonability; third, the partial compensatory problem of performance scores is well processed by using intuitionistic fuzzy Choquet (IFC) operator and generalized intuitionistic fuzzy ordered geometric averaging (GIFOGA) operator. These operators can deal with the compensatory performance scores and non-compensatory performance scores respectively. Finally, a case study demonstrates the effectiveness of decision framework

  19. Project specific quality assurance plan for Project W-178, 219-S secondary containment

    International Nuclear Information System (INIS)

    Buckles, D.I.

    1994-01-01

    The scope of this Quality Assurance Program Plan (QAPP) is to provide a system of Quality Assurance reviews and verifications on the design, procurement and construction of the 219-S Secondary Containment Upgrade. The reviews and verifications will be on activities associated with design, procurement, and construction of the Secondary Containment Upgrade which includes, but is not limited to demolition, removal, new tank installation, tank 103 isolation, tank cell refurbishment, electrical, instrumentation, piping/tubing including supports, pump and valves, and special coatings. The full project scope is defined in the project Functional Design Criteria (FDC), SD-W178-FDC-001, and all activities must be in compliance with this FDC and related design documentation

  20. Coverage of, and compliance with, mass drug administration under the programme to eliminate lymphatic filariasis in India: a systematic review.

    Science.gov (United States)

    Babu, Bontha V; Babu, Gopalan R

    2014-09-01

    India's mass drug administration (MDA) programme to eliminate lymphatic filariasis (PELF) covers all 250 endemic districts, but compliance with treatment is not adequate for the programme to succeed in eradicating this neglected tropical disease. The objective of our study was to systematically review published studies on the coverage of and compliance with MDA under the PELF in India. We searched several databases-PubMed/Medline, Google Scholar, CINAHL/EBSCO, Web of Knowledge (including Web of Science) and OVID-and by applying selection criteria identified a total of 36 papers to include in the review. Overall MDA coverage rates varied between 48.8% and 98.8%, while compliance rates ranged from 20.8% to 93.7%. The coverage-compliance gap is large in many MDA programmes. The effective level of compliance, ≥65%, was reported in only 10 of a total of 31 MDAs (5 of 20 MDAs in rural areas and 2 of 12 MDAs in urban areas). The review has identified a gap between coverage and compliance, and potentially correctable causes of this gap. These causes need to be addressed if the Indian programme is to advance towards elimination of lymphatic filariasis. © The Author 2014. Published by Oxford University Press on behalf of Royal Society of Tropical Medicine and Hygiene. All rights reserved. For permissions, please e-mail: journals.permissions@oup.com.

  1. Licensing plan for UMTRA project disposal sites

    International Nuclear Information System (INIS)

    1993-09-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project Office developed a plan to define UMTRA Project licensing program objectives and establish a process enabling the DOE to document completion of remedial actions in compliance with 40 CFR 1 92 and the requirements of the NRC general license. This document supersedes the January 1987 Project Licensing Plan (DOE, 1987). The plan summarizes the legislative and regulatory basis for licensing, identifies participating agencies and their roles and responsibilities, defines key activities and milestones in the licensing process, and details the coordination of these activities. This plan provides an overview of the UMTRA Project from the end of remedial actions through the NRC's acceptance of a disposal site under the general license. The licensing process integrates large phases of the UMTRA Project. Other programmatic UMTRA Project documents listed in Section 6.0 provide supporting information

  2. Compliance with Iron-folic acid (IFA) therapy among pregnant ...

    African Journals Online (AJOL)

    Compliance increased with the increase in age, birth order and single daily dose. Forgetfulness and both perceived as well as experienced side effects of IFA therapy were the important factors for non-compliance. Conclusion: There was a moderate level of Compliance towards IFA tablets with key social and demographic ...

  3. The Critical Role of Pulmonary Arterial Compliance in Pulmonary Hypertension

    Science.gov (United States)

    Prins, Kurt W.; Pritzker, Marc R.; Scandurra, John; Volmers, Karl; Weir, E. Kenneth

    2016-01-01

    The normal pulmonary circulation is a low-pressure, high-compliance system. Pulmonary arterial compliance decreases in the presence of pulmonary hypertension because of increased extracellular matrix/collagen deposition in the pulmonary arteries. Loss of pulmonary arterial compliance has been consistently shown to be a predictor of increased mortality in patients with pulmonary hypertension, even more so than pulmonary vascular resistance in some studies. Decreased pulmonary arterial compliance causes premature reflection of waves from the distal pulmonary vasculature, leading to increased pulsatile right ventricular afterload and eventually right ventricular failure. Evidence suggests that decreased pulmonary arterial compliance is a cause rather than a consequence of distal small vessel proliferative vasculopathy. Pulmonary arterial compliance decreases early in the disease process even when pulmonary artery pressure and pulmonary vascular resistance are normal, potentially enabling early diagnosis of pulmonary vascular disease, especially in high-risk populations. With the recognition of the prognostic importance of pulmonary arterial compliance, its impact on right ventricular function, and its contributory role in the development and progression of distal small-vessel proliferative vasculopathy, pulmonary arterial compliance is an attractive target for the treatment of pulmonary hypertension. PMID:26848601

  4. A project-based geoscience curriculum: select examples

    Science.gov (United States)

    Brown, L. M.; Kelso, P. R.; White, R. J.; Rexroad, C. B.

    2007-12-01

    Principles of constructivist educational philosophy serve as a foundation for the recently completed National Science Foundation sponsored undergraduate curricular revision undertaken by the Geology Department of Lake Superior State University. We integrate lecture and laboratory sessions utilizing active learning strategies that focus on real-world geoscience experiences and problems. In this presentation, we discuss details of three research-like projects that require students to access original data, process and model the data using appropriate geological software, interpret and defend results, and disseminate results in reports, posters, and class presentations. The projects are from three upper division courses, Carbonate Systems, Sequence Stratigraphy, and Geophysical Systems, where teams of two to four students are presented with defined problems of durations ranging from a few weeks to an entire semester. Project goals and location, some background information, and specified dates and expectations for interim and final written and oral reports are provided to students. Some projects require the entire class to work on one data set, some require each team to be initially responsible for a portion of the project with teams ultimately merging data for interpretation and to arrive at final conclusions. Some projects require students to utilize data from appropriate geological web sites such as state geological surveys. Others require students to design surveys and utilize appropriate instruments of their choice for field data collection. Students learn usage and applications of appropriate geological software in compiling, processing, modeling, and interpreting data and preparing formal reports and presentations. Students uniformly report heightened interest and motivation when engaged in these projects. Our new curriculum has resulted in an increase in students" quantitative and interpretive skills along with dramatic improvement in communication and

  5. Time for a second look at SOX compliance.

    Science.gov (United States)

    Bigalke, John T; Burrill, Stephen J

    2007-08-01

    Incentives for tax-exempt healthcare organizations to comply with the Sarbanes-Oxley Act (SOX) abound from many quarters, including government, various associations, and the capital markets. New proposals from the Securities and Exchange Commission and the Public Company Accountability Oversight Board will streamline the processes of SOX compliance, even as the cost of compliance is dropping. Voluntary SOX compliance can best be achieved by adopting a four-phased control rationalization approach to implementation and maintenance.

  6. Compliance or good control and accountability

    International Nuclear Information System (INIS)

    Erkkila, B.H.

    1993-01-01

    DOE Orders and draft orders for nuclear material control and accountability address the need for a complete material control and accountability (MC ampersand A) program for all DOE contractors processing, using, and/or storing nuclear materials. These orders also address performance as well as compliance issues. Very often the existence of a program or an element of a program satisfies the compliance aspect of DOE requirements. The concept of performance requirements is new and requires new thinking with all of the elements of the MC ampersand A program. The contractor is so accustomed to compliance with DOE requirements that dealing with performance is not well understood. In this paper I will address the receptiveness of performance requirements by the contractor. Auditing for performance is also a new concept and has not been implemented. The contractor will have to learn how to measure the performance of the MC ampersand A program and be able to demonstrate a certain level of performance to the oversight organization. This paper will contain a discussion of a well organized MC ampersand A program, the compliance issues associated with the program, the performance criteria associated with the program, and how to audit such a program

  7. Compliance with Corporate Governance Principles: Australian Evidence

    Directory of Open Access Journals (Sweden)

    Maryam Safari

    2015-12-01

    Full Text Available This study investigates the association between the level of compliance of Australian listed companies with Australian corporate governance principles, in aggregate, and the level of discretionary accruals using the modified Jones model. It is hypothesised that higher levels of compliance would be associated with lower levels of discretionary accruals. Data from a random sample of 214 Australian listed companies for the years 2009 and 2010 were used to test the hypothesis. The results demonstrate a significant negative relationship indicating that companies with higher levels of compliance engage in lower levels of earnings management via discretionary accruals.

  8. Site Observational Work Plan for the UMTRA project site at Ambrosia Lake, New Mexico

    International Nuclear Information System (INIS)

    1995-02-01

    Ground water compliance for the Uranium Mill Tailings Remedial Action (UMTRA) Project sites, including the Ambrosia Lake, New Mexico, site, is governed by the Uranium Mills Tailings Radiation Control Act (42 USC section 7901 et seq.) and the U.S. Environmental Protection Agency's Health and Environmental Protection Standards for Uranium and Thorium Mill Tailings (40 CFR Part 192; 60 FR 2854). The EPA standards describe specific conditions for which the U.S. Department of Energy (DOE) may apply for supplemental standards for contaminated ground water rather than meeting background levels or numerical standards. To achieve compliance with Subpart A of the EPA standards the residual radioactive materials are currently being consolidated on the site by the DOE in a disposal cell, isolating them from direct human or ecological contact and further dispersion into the environment. Completion of the disposal cell is scheduled for early 1995. An environmental assessment and a Finding of No Significant Impact (FONSI) were completed in 1987. Concurrence with the UMTRA Surface Project Ambrosia Lake remedial action plan (RAP) was granted by the U.S. Nuclear Regulatory Commission (NRC) and state of New Mexico in 1990. The DOE deferred compliance with Subpart B of the EPA standards in the Surface Project RAP. This site observational work plan (SOWP) is the first document to address ground water compliance under Subpart B at the Ambrosia Lake site. The Ambrosia Lake UMTRA Project site is within the Grants Mineral Belt and was one of numerous uranium mills supplied by many local mines. Ground water contamination at the site occurred as a result of uranium mill operations. Contamination of ground water resulted from discharge of waste water, infiltration of water through the tailings pile, hydraulic placement of mill tailings in nearby mines, and water pumped from mine shafts

  9. Influence of Self-Efficacy on Compliance to Workplace Exercise

    DEFF Research Database (Denmark)

    Pedersen, Mette Merete; Zebis, Mette Kreutzfeldt; Langberg, Henning

    2013-01-01

    BACKGROUND: Continuous neck and shoulder pain is a common musculoskeletal complaint. Physical exercise can reduce pain symptoms, but compliance to exercise is a challenge. Exercise-specific self-efficacy has been found to be a predictor of participation in preplanned exercise. Little is known about...... the influence of exercise-specific self-efficacy on compliance to workplace physical exercise. PURPOSE: To determine the influence of exercise-specific self-efficacy on compliance to specific strength exercises during working hours for laboratory technicians. METHODS: We performed a cluster......). The participants answered baseline and follow-up questions regarding self-efficacy and registered all exercises in a diary. RESULTS: Overall compliance to exercises was 45 %. Compliance in company A (private sector) differed significantly between the three self-efficacy groups after 20 weeks. The odds ratio...

  10. 17 CFR 248.128 - Effective date, compliance date, and prospective application.

    Science.gov (United States)

    2010-04-01

    ... Affiliate Marketing § 248.128 Effective date, compliance date, and prospective application. (a) Effective date. This subpart is effective September 10, 2009. (b) Mandatory compliance date. Compliance with this... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Effective date, compliance...

  11. Compliance to antihypertensive therapy

    International Nuclear Information System (INIS)

    Almas, A.; Hameed, A.; Ahmed, B.; Islam, M.

    2006-01-01

    Objective: To determine compliance, factors affecting compliance to antihypertensive therapy and to compare compliant and non-compliant groups, in a tertiary care setting. Study Design: Analytical (cross-sectional) study. Place and Duration of Study: The outpatient clinics at the Aga Khan University from May 2004 to February 2005. Patients and Methods: Two hundred patients presenting to the outpatients clinic were included. All patients 18 years and above, who had stage 1 and 2 hypertension, had one clinic visit to a medicine clinic, 6 months prior to presentation and started on antihypertensive medicines, were included. Results: Sixty-six percent were males and 33.5 % were females. Mean age was 58.1 ( +- 12) years and mean duration of hypertension was 7.2 (+- 6.7) years. Fifty-seven percent were compliant and 43% were noncompliant. In the noncompliant group, 53.4 % had mild noncompliance, 24.4 % had severe non-compliance, while 22% had moderate noncompliance. Factors of noncompliance were 56.8% missed doses due to forgetfulness, 12.7% deliberately missed their doses, 11.6% could not take the medicine due to side effects, 10.4% did not take the dose due to increased number of tablets, 4.6% were not properly counseled by the physician and 3.48% did not take medicines due to cost issues. The mean systolic blood pressure was 126 +- 19.2 mmHg in the compliant group while it was 133 +- 16.5 mmHg in the noncompliant group (p-value 0.004). The mean diastolic blood pressure in the compliant group was 76 +- 11.9 mmHg, while in the noncompliant group it was 81.9 +- 10.9 mmHg (p-value 0.001). Conclusion: Compliance to antihypertensive therapy in a tertiary care center is significantly good. Forgetfulness was the major reason for noncompliance. The mean blood pressure control was better in the compliant group. (author)

  12. A Hybrid MCDM Approach for Strategic Project Portfolio Selection of Agro By-Products

    Directory of Open Access Journals (Sweden)

    Animesh Debnath

    2017-07-01

    Full Text Available Due to the increasing size of the population, society faces several challenges for sustainable and adequate agricultural production, quality, distribution, and food safety in the strategic project portfolio selection (SPPS. The initial adaptation of strategic portfolio management of genetically modified (GM Agro by-products (Ab-Ps is a huge challenge in terms of processing the agro food product supply-chain practices in an environmentally nonthreatening way. As a solution to the challenges, the socio-economic characteristics for SPPS of GM food purchasing scenarios are studied. Evaluation and selection of the GM agro portfolio management are the dynamic issues due to physical and immaterial criteria involving a hybrid multiple criteria decision making (MCDM approach, combining modified grey Decision-Making Trial and Evaluation Laboratory (DEMATEL, Multi-Attributive Border Approximation area Comparison (MABAC and sensitivity analysis. Evaluation criteria are grouped into social, differential and beneficial clusters, and the modified DEMATEL procedure is used to derive the criteria weights. The MABAC method is applied to rank the strategic project portfolios according to the aggregated preferences of decision makers (DMs. The usefulness of the proposed research framework is validated with a case study. The GM by-products are found to be the best portfolio. Moreover, this framework can unify the policies of agro technological improvement, corporate social responsibility (CSR and agro export promotion.

  13. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.

  14. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    International Nuclear Information System (INIS)

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE's goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agency (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology

  15. Job Burnout Reduces Hand Hygiene Compliance Among Nursing Staff.

    Science.gov (United States)

    Manomenidis, Georgios; Panagopoulou, Efharis; Montgomery, Anthony

    2017-10-13

    Health professional burnout has been associated with suboptimal care and reduced patient safety. However, the extent to which burnout influences hand hygiene compliance among health professionals has yet to be explored. The aim of the study was to examine whether job burnout reduces hand washing compliance among nursing staff. A diary study was conducted. Forty registered nurses working in a general city hospital in Thessaloniki, Greece, completed a questionnaire, while they were monitored for hand hygiene compliance following the World Health Organization protocol for hand hygiene assessment. Burnout was measured using validated items from the Maslach Burnout Inventory. Data were collected from September to October 2015. Multiple regression analysis showed that controlling for years in practice, burnout was negatively associated with hand hygiene compliance (R = 0.322, F(3,36) = 5.704, P compliance to hand hygiene among nurses. Given the crucial role of hand hygiene compliance for the prevention of in-hospital infections, this study highlights the need for interventions targeting the prevention of burnout among nursing staff.

  16. Agent Architectures for Compliance

    Science.gov (United States)

    Burgemeestre, Brigitte; Hulstijn, Joris; Tan, Yao-Hua

    A Normative Multi-Agent System consists of autonomous agents who must comply with social norms. Different kinds of norms make different assumptions about the cognitive architecture of the agents. For example, a principle-based norm assumes that agents can reflect upon the consequences of their actions; a rule-based formulation only assumes that agents can avoid violations. In this paper we present several cognitive agent architectures for self-monitoring and compliance. We show how different assumptions about the cognitive architecture lead to different information needs when assessing compliance. The approach is validated with a case study of horizontal monitoring, an approach to corporate tax auditing recently introduced by the Dutch Customs and Tax Authority.

  17. Projects of Iberdrola Engineering and Construction on the Flamanville 3 EPR

    International Nuclear Information System (INIS)

    Zornoza, J.; Dumas, H.; Sesma, J. L.; Cubian, B.; Diaz, J. I.

    2013-01-01

    Iberdrola Engineering and Construction is participating during the last 5 years in 5 projects on the Flamanville 3 EPR, both in the nuclear island and conventional island and the pump house. These projects represent a challenge from the technical point of view due to the high requirements applicable to the project because of the experience feedback of the operator EDF and of compliance with new regulations that have emerged since the completion of the last nuclear power station in France. This paper presents the description of these projects, as well as its current status. (Author)

  18. Wetland restoration and compliance issues on the Savannah River site

    International Nuclear Information System (INIS)

    Wein, G.R.; McLeod, K.W.; Sharitz, R.R.

    1993-01-01

    Operation of the nuclear production reactors on the Savannah River Site has faced potential conflicts with wetland regulations on several occasions. This paper provides two examples in which regulatory compliance and restoration research have been meshed, providing both compliance and better knowledge to aid future regulatory needs. The decision to restart the L reactor required the mitigation of thermal effluents under Sec. 316 of the Clean Water Act. The National Pollutant Discharge Elimination System, permit for the selected mitigation alternative, a 405-ha once-through cooling reservoir, required the establishment of a balanced biological community (BBC) within the lake. To promote the development of a BBC, the reservoir was seeded with water from an existing BBC (Par Pond) and stocked with fish and had artificial reefs constructed. The US Department of Energy (DOE) also requested that the Savannah River Ecology Laboratory establish littoral/wetland vegetation along the shoreline to provide aquatic and wildlife habitat, shoreline stabilization, and a good faith effort toward the establishment of a BBC. The development of wetland vegetation was deemed important to the successful development of a BBC within L Lake. However, in a similar cooling reservoir system constructed in 1957 (Par Pond), wetland vegetation successfully developed without any planting effort. Other than the good faith effort toward a BBC, there is no reason to assume a littoral/wetland community would not develop of its own accord. However, research conducted at L Lake indicates that the planting of wetland vegetation at L Lake accelerated the process of natural selection over that of areas that were not planted

  19. Barriers and facillitators to compliance with routine mammographic screening

    International Nuclear Information System (INIS)

    Kessler, H.B.; Rimer, B.; Keintz, M.K.; Myers, R.E.; Engstrom, P.F.

    1988-01-01

    Six hundred one randomly selected women were interviewed to determine their reasons for compliance or noncompliance with free HMO-sponsored mammographic examinations. Noncompliers were significantly more likely to believe mammograms are unnecessary without symptoms, too much trouble, or inconvenient and to perceive their physicians as not recommending mammograms. Compliers were more likely to believe that early breast cancer can be cured and to recognize that breast screening is for asymptomatic individuals. When cost is eliminated as a barrier to screening, a variety of socioeconomic, psychological, and access barriers are exposed. Radiologists must be cognizant of these factors in planning and participating in breast cancer screening programs

  20. Influence of self-efficacy on compliance to workplace exercise.

    Science.gov (United States)

    Pedersen, Mette Merete; Zebis, Mette Kreutzfeldt; Langberg, Henning; Poulsen, Otto Melchior; Mortensen, Ole Steen; Jensen, Jette Nygaard; Sjøgaard, Gisela; Bredahl, Thomas; Andersen, Lars Louis

    2013-09-01

    Continuous neck and shoulder pain is a common musculoskeletal complaint. Physical exercise can reduce pain symptoms, but compliance to exercise is a challenge. Exercise-specific self-efficacy has been found to be a predictor of participation in preplanned exercise. Little is known about the influence of exercise-specific self-efficacy on compliance to workplace physical exercise. To determine the influence of exercise-specific self-efficacy on compliance to specific strength exercises during working hours for laboratory technicians. We performed a cluster-randomized controlled trial, including laboratory technicians from two industrial production units in Copenhagen, Denmark. The participants were randomized to supervised specific strength exercises for the neck and shoulder muscles for 20 minutes three times a week (n = 282) or to a reference group (n = 255). The participants answered baseline and follow-up questions regarding self-efficacy and registered all exercises in a diary. Overall compliance to exercises was 45 %. Compliance in company A (private sector) differed significantly between the three self-efficacy groups after 20 weeks. The odds ratio of compliance was 2.37 for moderate versus low self-efficacy, and 2.93 for high versus low self-efficacy. No significant difference was found in company B (public sector) or in the intervention group as a whole. We did not find self-efficacy to be a general statistically significant predictor of compliance to exercises during 20 weeks, but found self-efficacy to be a predictor of compliance in a private sector setting. Workplace-specific differences might be present and should be taken into account.