WorldWideScience

Sample records for compliance project selection

  1. Project Compliance with Enterprise Architecture

    NARCIS (Netherlands)

    Foorthuis, R.M.

    2012-01-01

    This research project set out to identify effective practices and models for working with projects that are required to comply with Enterprise Architecture (EA), and investigate the benefits and drawbacks brought about by compliance. Research methods used are canonical action research, a statistical

  2. 1995 project of the year Hanford Environmental compliance project nomination

    Energy Technology Data Exchange (ETDEWEB)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders` objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring.

  3. 1995 project of the year Hanford Environmental compliance project nomination

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-02-01

    The completion of the Hanford Environmental Compliance (HEC) Project in December 1995 brought to a successful close a long line of major contributions to environmental cleanup. Not since the early days of the Hanford Site during and shortly after World War 11 had such a large group of diverse construction activities, with a common goal, been performed at Hanford. Key to this success was the unique combination of 14 subprojects under the HEC Project which afforded the flexibility to address evolving subproject requirements. This strategy resulted in the accomplishment of the HEC Project stakeholders' objectives on an aggressive schedule, at a $33 million cost savings to the customer. The primary objectives of the HEC Project were to upgrade selected Hanford Site facilities and systems to bring them into compliance with current environmental standards and regulations. The HEC Project contributed significantly towards the Hanford site compliance with Clean Water Act, Resource Conservation and Recovery Act (RCRA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requirements. It provided, in part, those construction activities required to comply with those requirements in the areas of liquid and solid waste treatment and disposal, waste characterization, and groundwater monitoring

  4. Design of compliant mechanisms with selective compliance

    International Nuclear Information System (INIS)

    Hasse, Alexander; Campanile, Lucio Flavio

    2009-01-01

    Conventional mechanisms provide a defined mobility, which expresses the number of degrees of freedom of the mechanism. This allows the system to be driven by a low number of control outputs. This property is virtually retained in the case of compliant mechanisms with lumped compliance, which are obtained by replacing the conventional hinges by solid-state ones. Compliant mechanisms with distributed compliance have, in general, an infinite number of degrees of freedom and therefore cannot guarantee defined kinematics. In this paper the concept of compliant mechanisms with selective compliance is introduced. This special class of compliant mechanisms combines the advantages of distributed compliance with the easy controllability of systems with defined kinematics. The task is accomplished by introducing a new design criterion based on a modal formulation. After this design criterion has been implemented in an optimization formulation for a formal optimization procedure, mechanisms are obtained in which a freely chosen deformation pattern is associated with a low deformation energy while other deformation patterns are considerably stiffer. Besides the description of the modal design criterion and the associated objective function, the sensitivity analysis of the objective function is presented and an application example is shown

  5. IT Project Selection

    DEFF Research Database (Denmark)

    Pedersen, Keld

    2016-01-01

    for initiation. Most of the research on project selection is normative, suggesting new methods, but available empirical studies indicate that many methods are seldom used in practice. This paper addresses the issue by providing increased understanding of IT project selection practice, thereby facilitating...... the development of methods that better fit current practice. The study is based on naturalistic decision-making theory and interviews with experienced project portfolio managers who, when selecting projects, primarily rely on political skills, experience and personal networks rather than on formal IT project......-selection methods, and these findings point to new areas for developing new methodological support for IT project selection....

  6. ELECTRONIC COMPLIANCE AND APPROVAL PROJECT (ECAP)

    Energy Technology Data Exchange (ETDEWEB)

    Hope Morgan; Richard A. Varela; Deborah LaHood; Susan Cisco; Mary Ann Benavides; Donna Burks

    2002-11-01

    The Texas Railroad Commission (RRC), working in partnership with the United States Department of Energy and the oil and gas industry it regulates, is implementing a strategy for improving efficiency in regulations and significantly reducing administrative operating costs through the Electronic Compliance and Approval Process (ECAP). The project will streamline regulatory compliance and reporting by providing the ability to electronically submit, process, and query oil and gas applications and reports through the Internet-based ECAP system. Implementation of an ECAP drilling permit pilot project began September 1999 after funding resources were secured--a $700,000 grant from the U.S. Department of Energy and an appropriation of $1.4 million from the Texas Legislature. The pilot project involves creating the ability to file, review, and approve a well's drilling permit application through a completely electronic process. The pilot project solution will ultimately provide the infrastructure, technology, and electronic modules to enable the filing of all compliance permits and performance reports through the internet from a desktop computer. The pilot project was conducted in three phases. The first phase, implemented May 2000, provided the infrastructure that allows the electronic filing and approval of simple drilling permit applications, associated fees, and attachments. The official ''roll-out'' of ECAP and the first electronically filed drilling permit application occurred on May 11, 2000 in Dallas in conjunction with an Internet Workshop sponsored by the Petroleum Technology Transfer Council. After the completion of Phase I, the ECAP team conducted an extensive review of progress to date and analyzed requirements and opportunities for future steps. The technical team identified core infrastructure modifications that would facilitate and better support future development and expansion of the ECAP system and work began on database structure

  7. Supporting domain experts to select and configure precise compliance rules

    NARCIS (Netherlands)

    Ramezani, E.; Fahland, D.; Aalst, van der W.M.P.; Lohmann, N.; Song, M.; Wohed, P.

    2014-01-01

    Compliance specifications concisely describe selected aspects of what a business operation should adhere to. To enable automated techniques for compliance checking, it is important that these requirements are specified correctly and precisely, describing exactly the behavior intended. Although there

  8. Ecological Compliance Assessment Project: 1994 Summary report

    International Nuclear Information System (INIS)

    Brandt, C.A.

    1994-11-01

    The Ecological Compliance Assessment Project (ECAP) began full operation on March 1, 1994. The project is designed around a baseline environmental data concept that includes intensive biological field surveys of key areas of the Hanford Site where the majority of Site activities occur. These surveys are conducted at biologically appropriate times of year to ensure that the data gathered are current and accurate. The data are entered into the ECAP database, which serves as a reference for the evaluation of review requests coming in to the project. This methodology provided the basis for over 90 percent of the review requests received. Field surveys conducted under ECAP are performed to document occurrence information for species of concern and to obtain habitat descriptions. There are over 200 species of concern on the Hanford Site, including plants, birds, mammals, reptiles, amphibians, fish, and invertebrates. In addition, Washington State has designated mature sagebrush-steppe habitat as a Priority Habitat meriting special protective measures. Of the projects reviewed, 17 resulted or will result in impacts to species or habitats of concern on the Hanford Site. The greatest impact has been on big sagebrush habitat. Most of the impact has been or will be within the 600 Area of the Site

  9. Project W-519 TWRS privatization phase 1 infrastructure year 2000 compliance assessment project plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-519. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  10. Project W-211 initial tank retrieval systems year 2000 compliance assessment project plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-211. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  11. Project W-151 Tank 101-AZ Waste Retrieval System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-151. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance

  12. Sales Tax Compliance and Audit Selection

    OpenAIRE

    Murray, Matthew N.

    1995-01-01

    Uses sample selection estimation techniques to identify systematic audit selection rules and determinants of sales tax underreporting. Though based on data from only one state (Tennessee), outcomes are useful in developing and evaluating audit selection results.

  13. Final report Hanford environmental compliance project 89-D-172

    International Nuclear Information System (INIS)

    Kelly, J.R.

    1996-01-01

    The Hanford Environmental Compliance (HEC) Project is unique in that it consisted of 14 subprojects which varied in project scope and were funded from more that one program. This report describes the HEC Project from inception to completion and the scope, schedule, and cost of the individual subprojects. Also provided are the individual subproject Cost closing statements and Project completion reports accompanied by construction photographs and illustrations

  14. Environmental projects. Volume 3: Environmental compliance audit

    Science.gov (United States)

    1987-01-01

    The Goldstone Deep Space Communications Complex is part of NASA's Deep Space Network, one of the world's largest and most sensitive scientific telecommunications and radio navigation networks. Activities at Goldstone are carried out in support of six large parabolic dish antennas. In support of the national goal of the preservation of the environment and the protection of human health and safety, NASA, JPL and Goldstone have adopted a position that their operating installations shall maintain a high level of compliance with Federal, state, and local laws governing the management of hazardous substances, abestos, and underground storage tanks. A JPL version of a document prepared as an environmental audit of Goldstone operations is presented. Both general and specific items of noncompliance at Goldstone are identified and recommendations are provided for corrective actions.

  15. 324 Building Compliance Project: Selection and evaluation of alternatives for the removal of solid remote-handled mixed wastes from the 324 Building

    International Nuclear Information System (INIS)

    Ross, W.A.; Bierschbach, M.C.; Dukelow, J.S. Jr.

    1995-06-01

    Six alternatives for the interim storage of remote-handled mixed wastes from the 324 Building on the Hanford Site have been identified and evaluated. The alternatives focus on the interim storage facility and include use of existing facilities in the 200 Area, the construction of new facilities, and the vitrification of the wastes within the 324 Building to remove the majority of the wastes from under RCRA regulations. The six alternatives are summarized in Table S.1, which identifies the primary facilities to be utilized, the anticipated schedule for removal of the wastes, the costs of the transfer from 324 Building to the interim storage facility (including any capital costs), and an initial risk comparison of the alternatives. A recently negotiated Tri-Party Agreement (TPA) change requires the last of the mixed wastes to be removed by May 1999. The ability to use an existing facility reduces the costs since it eliminates the need for new capital construction. The basic regulatory approvals for the storage of mixed wastes are in place for the PUREX facility, but the Form HI permit will need some minor modifications since the 324 Building wastes have some additional characteristic waste codes and the current permit limits storage of wastes to those from the facility itself. Regulatory reviews have indicated that it will be best to use the tunnels to store the wastes. The PUREX alternatives will only provide storage for about 65% of the wastes. This results from the current schedule of the B-Cell Clean Out Project, which projects that dispersible debris will continue to be collected in small quantities until the year 2000. The remaining fraction of the wastes will then be stored in another facility. Central Waste Complex (CWC) is currently proposed for that residual waste storage; however, other options may also be available

  16. Environmental management compliance reengineering project, FY 1997 report

    International Nuclear Information System (INIS)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL''s environment, safety, and health requirements and milestone commitments. Compliance reengineer''s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL

  17. Environmental management compliance reengineering project, FY 1997 report

    Energy Technology Data Exchange (ETDEWEB)

    VanVliet, J.A.; Davis, J.N.

    1997-09-01

    Through an integrated reengineering effort, the Idaho National Engineering and Environmental Laboratory (INEEL) is successfully implementing process improvements that will permit safe and compliant operations to continue during the next 5 years, even though $80 million was removed from the Environmental Management (EM) program budget. A 2-year analysis, design, and implementation project will reengineer compliance-related activities and reduce operating costs by approximately $17 million per year from Fiscal Year (FY) 1998 through 2002, while continuing to meet the INEEL`s environment, safety, and health requirements and milestone commitments. Compliance reengineer`s focus is improving processes, not avoiding full compliance with environmental, safety, and health laws. In FY 1997, compliance reengineering used a three-phase approach to analyze, design, and implement the changes that would decrease operating costs. Implementation for seven specific improvement projects was completed in FY 1997, while five projects will complete implementation in FY 1998. During FY 1998, the three-phase process will be repeated to continue reengineering the INEEL.

  18. Canister storage building compliance assessment SNF project NRC equivalency criteria - HNF-SD-SNF-DB-003

    International Nuclear Information System (INIS)

    BLACK, D.M.

    1999-01-01

    This document presents the Project's position on compliance with the SNF Project NRC Equivalency Criteria - HNF-SD-SNF-DE-003, Spent Nuclear Fuel Project Path Forward Additional NRC Requirements. No non-compliances are shown. The compliance statements have been reviewed and approved by DOE. Open items are scheduled to be closed prior to project completion

  19. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This document contains a limited assessment of Year 2000 compliance for Project W-420. Additional information is provided as a road map to project documents and other references that may be used to verify Year 2000 compliance. This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  20. Environmental Assessment of Ground Water Compliance at the Gunnison, Colorado, UMTRA Project Site

    International Nuclear Information System (INIS)

    2002-01-01

    The U.S. Department of Energy (DOE) is in the process of selecting a ground water compliance strategy for the Gunnison, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project site. This Environmental Assessment (EA) discusses two alternatives and the effects associated with each. The two alternatives are (1) natural flushing coupled with institutional controls and continued monitoring and (2) no action. The compliance strategy must meet U.S. Environmental Protection Agency (EPA) ground water standards defined in Title 40 ''Code of Federal Regulations'' Part 192, Subpart B, in areas where ground water beneath and around the site is contaminated as a result of past milling operations. It has been determined that contamination in the ground water at the Gunnison site consists of soluble residual radioactive material (RRM) as defined in the Uranium Mill Tailings Radiation Control Act (UMTRCA)

  1. Environmental studies and clearance compliance of Kudankulam Atomic Power Project

    International Nuclear Information System (INIS)

    Agarwal, S.K.; Singh, Jitendra

    2002-01-01

    Full text: Nuclear industry has played a leading role in evolving proper and effective environmental management impact from development practices right form inception thus minimizing the environmental impact from developmental activities of man. In the engineering design of nuclear power plant, safety is further enhanced considerably by providing double back-upped engineered safety systems. Besides the engineered safety, the other factors considered for ensuring environmental impact minimization are siting criteria, conservative rad-waste management, effluent treatment, application of stringent environmental protection standards for limiting waste discharges, an elaborate environmental surveillance program and an on site and off site emergency preparedness plan. Recently, nuclear power industry has taken a drive to develop and implement Environmental Management System (EMS) to all its operating stations in line with ISO-14001 standards. For Kudankulam atomic power project, a number of studies specifically for environmental protection are carried out to meet the requirements of Russian Federation, new guidelines of Ministry of environment and Forests (MOEF) and Atomic Energy Regulatory Board (AERB). In the present paper an attempt has been made to present the environmental management plan and clearance compliance status of the project

  2. Project in use compliance air pollution by cars: annual report 1994-1995

    NARCIS (Netherlands)

    Rijkeboer, R.C.; Binkhorst, R.P.; Zuidgeest, L.W.M.; Rozendal, W.G.J.

    1996-01-01

    This report describes the results of the 8th measuring year of the "in-use compliance project" carried out by TNO at the request of the Dutch Ministry of the Environment. Purpose and implementation of the project are in general terms that in connection with compliance with (international)

  3. Project W-420 Ventilation Stack Monitoring System Year 2000 Compliance Assessment Project Plan

    International Nuclear Information System (INIS)

    BUSSELL, J.H.

    1999-01-01

    This assessment describes the potential Year 2000 (Y2K) problems and describes the methods for achieving Y2K Compliance for Project W-420, Ventilation Stack Monitoring Systems Upgrades. The purpose of this assessment is to give an overview of the project. This document will not be updated and any dates contained in this document are estimates and may change. The project work scope includes upgrades to ventilation stacks and generic effluent monitoring systems (GEMS) at the 244-A Double Contained Receiver Tank (DCRT), the 244-BX DCRT, the 244-CR Vault, tanks 241-C-105 and 241-C-106, the 244-S DCRT, and the 244-TX DCRT. A detailed description of system dates, functions, interfaces, potential Y2K problems, and date resolutions can not be described since the project is in the definitive design phase, This assessment will describe the methods, protocols, and practices to ensure that equipment and systems do not have Y2K problems

  4. IDENTIFICATION AND SELECTION OF SIX SIGMA PROJECTS

    Directory of Open Access Journals (Sweden)

    Abdalhkeim FA. Flifel

    2017-04-01

    Full Text Available Six Sigma is a well-structured and proven methodology for improving organizational performance. It helps achieving the goals of the organization through the use of project-driven approach. The implementation of Six sigma approach depends on proper identification and selection of projects, moreover, the selection of right Six sigma projects is one of the critical success factors of six sigma efforts. The paper provides the sources for the identification of potential projects, top down and bottom up approaches, the process of selection of projects, guidelines that assist the selection of appropriate projects, selection criteria which must be precisely chosen in accordance with the objectives, needs and capabilities of the organization as well as sophisticated techniques and tools recommended in the literature for the selection of projects.

  5. CROSS-COMPLIANCE Facilitating the CAP reform: Compliance and competitiveness of European agriculture : Specific Targeted Research or Innovation Project (STREP) Integrating and Strengthening the European Research Area

    NARCIS (Netherlands)

    Jongeneel, R.A.; Bezlepkina, I.; Winsten, J.; Fox, G.

    2008-01-01

    The prime aim or the project was on assessing the impacts of compliance with standards, more specifically those part of cross-compliance, on EU’s external competitiveness. This is why in several deliverables and also in the main text of this Deliverable 13 a lot of attention is given to the EU and

  6. Information Security for Compliance with Select Agent Regulations

    Science.gov (United States)

    Lewis, Nick; Campbell, Mark J.

    2015-01-01

    The past decade has seen a significant rise in research on high-consequence human and animal pathogens, many now known as “select agents.” While physical security around these agents is tightly regulated, information security standards are still lagging. The understanding of the threats unique to the academic and research environment is still evolving, in part due to poor communication between the various stakeholders. Perhaps as a result, information security guidelines published by select agent regulators lack the critical details and directives needed to achieve even the lowest security level of the Federal Information Security Management Act (FISMA). While only government agencies are currently required to abide by the provisions of FISMA (unless specified as preconditions for obtaining government grants or contracts—still a relatively rare or narrowly scoped occurrence), the same strategies were recently recommended by executive order for others. We propose that information security guidelines for select agent research be updated to promulgate and detail FISMA standards and processes and that the latter be ultimately incorporated into select agent regulations. We also suggest that information security in academic and research institutions would greatly benefit from active efforts to improve communication among the biosecurity, security, and information technology communities, and from a secure venue for exchange of timely information on emerging threats and solutions in the research environment. PMID:26042864

  7. Information security for compliance with select agent regulations.

    Science.gov (United States)

    Lewis, Nick; Campbell, Mark J; Baskin, Carole R

    2015-01-01

    The past decade has seen a significant rise in research on high-consequence human and animal pathogens, many now known as "select agents." While physical security around these agents is tightly regulated, information security standards are still lagging. The understanding of the threats unique to the academic and research environment is still evolving, in part due to poor communication between the various stakeholders. Perhaps as a result, information security guidelines published by select agent regulators lack the critical details and directives needed to achieve even the lowest security level of the Federal Information Security Management Act (FISMA). While only government agencies are currently required to abide by the provisions of FISMA (unless specified as preconditions for obtaining government grants or contracts--still a relatively rare or narrowly scoped occurrence), the same strategies were recently recommended by executive order for others. We propose that information security guidelines for select agent research be updated to promulgate and detail FISMA standards and processes and that the latter be ultimately incorporated into select agent regulations. We also suggest that information security in academic and research institutions would greatly benefit from active efforts to improve communication among the biosecurity, security, and information technology communities, and from a secure venue for exchange of timely information on emerging threats and solutions in the research environment.

  8. Discriminative Projection Selection Based Face Image Hashing

    Science.gov (United States)

    Karabat, Cagatay; Erdogan, Hakan

    Face image hashing is an emerging method used in biometric verification systems. In this paper, we propose a novel face image hashing method based on a new technique called discriminative projection selection. We apply the Fisher criterion for selecting the rows of a random projection matrix in a user-dependent fashion. Moreover, another contribution of this paper is to employ a bimodal Gaussian mixture model at the quantization step. Our simulation results on three different databases demonstrate that the proposed method has superior performance in comparison to previously proposed random projection based methods.

  9. Educational Intervention Improves Compliance With AAN Guidelines for Return Epilepsy Visits: A Quality Improvement Project.

    Science.gov (United States)

    Nelson, Gary R; Filloux, Francis M; Kerr, Lynne M

    2016-10-01

    In 2011, the American Academy of Neurology (AAN) released guidelines for return seizure visits detailing 8 points that should be addressed during such visits. These guidelines are designed to improve routine follow-up care for epilepsy patients. The authors performed a quality improvement project aimed at increasing compliance with these guidelines after educating providers about them. The authors performed a chart review before and after an intervention which included: education regarding the guidelines, providing materials to remind providers of the guidelines, and templates to facilitate compliance. The authors reviewed charts at 2 and 6 months after the intervention. Significant improvement in documentation of 4 of the 8 measures was observed after this educational intervention. This suggests that simple educational interventions may help providers change practice and can improve compliance with new guidelines while requiring minimal time and resources to implement. © The Author(s) 2016.

  10. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    Science.gov (United States)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  11. Project governance: selected South African government experiments

    Directory of Open Access Journals (Sweden)

    G. van der Walt

    2008-07-01

    Full Text Available Some form of accountability and power structure binds all organisations. Such structures are typically referred to as the “governance” structure of the organisation. In organisations that have relatively mature project applications and methodologies in place, governance mechanisms are established on more permanent bases. With its focus on performance, results and outcomes, project governance establishes decision-making structures, as well as accountability and responsibility mechanisms in public institutions to oversee projects. As government institutions increasingly place emphasis on project applications for policy implementation and service delivery initiatives, mechanisms or structures should be established to facilitate clear interfaces between the permanent organisation and the temporary project organisation. Such mechanisms or structures should enhance the governance of projects, that is, the strategic alignment of projects, the decentralisation of decision- making powers, rapid resource allocation, and the participation of external stakeholders. The purpose of this article is to explore the concept “project governance”, and to highlight examples of project governance as applied in selected government departments in provincial and national spheres. This would enable the establishment of best practice examples and assist to develop benchmarks for effective project applications for service delivery improvement.

  12. ANP applied to electronics engineering project selection

    International Nuclear Information System (INIS)

    Habib, M.

    2010-01-01

    Project selection in Electronics engineering is a complex decision-making process. This research paper illustrates an application of ANP/AHP process. The AHP (Analytic Hierarchy Process) is employed to break down large unstructured decision problems into manageable and measureable components. The ANP, as the general form of AHP, is powerful to deal with complex decisions where interdependence exists in a decision model. The research paper discusses the use of the ANP, a general form of Saaty's analytic Network process, as a model to evaluate the value of competing Electronics projects. The research paper concludes with a case study describing the implementation of this model at an engineering college, including data based on the actual use of the decision making model. The case study helps to verify that AHP is an effective and efficient decision-making tool. A major contribution of this work is to provide a methodology for assessing the best project. Despite a number of publications applying AHP in project selection, this is probably the first time that an attempt has been made to apply AHP in an electronics project selection in an engineering university environment. (author)

  13. Evaluation of the WIPP Project`s compliance with the EPA radiation protection standards for disposal of transuranic waste

    Energy Technology Data Exchange (ETDEWEB)

    Neill, R.H.; Chaturvedi, L.; Rucker, D.F.; Silva, M.K.; Walker, B.A.; Channell, J.K.; Clemo, T.M. [Environmental Evaluation Group, Albuquerque, NM (United States)]|[Environmental Evaluation Group, Carlsbad, NM (United States)

    1998-03-01

    The US Environmental Protection Agency`s (EPA) proposed rule to certify that the Waste Isolation Pilot Plant (WIPP) meets compliance with the long-term radiation protection standards for geologic repositories (40CFR191 Subparts B and C), is one of the most significant milestones to date for the WIPP project in particular, and for the nuclear waste issue in general. The Environmental Evaluation Group (EEG) has provided an independent technical oversight for the WIPP project since 1978, and is responsible for many improvements in the location, design, and testing of various aspects of the project, including participation in the development of the EPA standards since the early 1980s. The EEG reviewed the development of documentation for assessing the WIPP`s compliance by the Sandia National Laboratories following the 1985 promulgation by EPA, and provided many written and verbal comments on various aspects of this effort, culminating in the overall review of the 1992 performance assessment. For the US Department of Energy`s (DOE) compliance certification application (CCA), the EEG provided detailed comments on the draft CCA in March, 1996, and additional comments through unpublished letters in 1997 (included as Appendices 8.1 and 8.2 in this report). Since the October 30, 1997, publication of the EPA`s proposed rule to certify WIPP, the EEG gave presentations on important issues to the EPA on December 10, 1997, and sent a December 31, 1997 letter with attachments to clarify those issues (Appendix 8.3). The EEG has raised a number of questions that may have an impact on compliance. In spite of the best efforts by the EEG, the EPA reaction to reviews and suggestions has been slow and apparently driven by legal considerations. This report discusses in detail the questions that have been raised about containment requirements. Also discussed are assurance requirements, groundwater protection, individual protection, and an evaluation of EPA`s responses to EEG`s comments.

  14. Selecting users for participation in IT projects

    DEFF Research Database (Denmark)

    Rasmussen, Rasmus; Christensen, Anders S.; Fjeldsted, Tobias

    2011-01-01

    The selection of users for participation in IT projects involves trade-offs between multiple criteria, one of which is selecting a representative cross-section of users. This criterion is basic because trading it for other criteria means basing designs on information biased toward some user groups...... at the expense of others. Based on interviews in development and customer organizations we find that their criteria for user selection favour persons who can contribute to the progress of the IT project over persons who are representative of the full range of users. A highly valued contribution from...... participating users is the ability to advocate a vision for the system and champion its organizational implementation. A survey in one customer organization shows that respondents’ personal traits explain up to 31% of the variation in their experience of aspects of the usability of a recently introduced system...

  15. Environmental Assessment of Ground Water Compliance at the Naturita, Colorado, UMTRA Project Site

    Energy Technology Data Exchange (ETDEWEB)

    None

    2003-04-23

    This Environmental Assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Naturita, Colorado, Uranium Mill Tailings Remedial Action Project site. In 1998, the U.S. Department of Energy (DOE) completed surface cleanup at the site and encapsulated the tailings in a disposal cell 15 miles northwest near the former town of Uravan, Colorado. Ground water contaminants of potential concern at the Naturita site are uranium and vanadium. Uranium concentrations exceed the maximum concentration limit (MCL) of 0.044 milligram per liter (mg/L). Vanadium has no MCL; however, vanadium concentrations exceed the EPA Region III residential risk-based concentration of 0.33 mg/L (EPA 2002). The proposed compliance strategy for uranium and vanadium at the Naturita site is no further remediation in conjunction with the application of alternate concentration limits. Institutional controls with ground water and surface water monitoring will be implemented for these constituents as part of the compliance strategy. This compliance strategy will be protective of human health and the environment. The proposed monitoring program will begin upon regulatory concurrence with the Ground Water Compliance Action Plan (DOE 2002a). Monitoring will consist of verifying that institutional controls remain in place, collecting ground water samples to verify that concentrations of uranium and vanadium are decreasing, and collecting surface water samples to verify that contaminant concentrations do not exceed a regulatory limit or risk-based concentration. If these criteria are not met, DOE would reevaluate the proposed action and determine the need for further National Environmental Policy Act documentation. No comments were received from the public during the public comment period. Two public meetings were held during this period. Minutes of these meetings are included as

  16. A quality project to improve compliance with AAP guidelines for inpatient management of neonatal hyperbilirubinemia.

    Science.gov (United States)

    Tartaglia, Kimberly M; Campbell, Jessica; Shaniuk, Paul; McClead, Richard E

    2013-07-01

    The goal of this study was to improve compliance with published guidelines regarding management of neonatal hyperbilirubinemia in infants admitted to a general pediatric hospital ward and to improve support for their breastfeeding mothers. This quality improvement project was conducted by using Plan-Do-Study-Act cycles and statistical process control methods. Study subjects were infants > 35 weeks' gestation admitted for hyperbilirubinemia to the general inpatient ward of a large, freestanding pediatric hospital. We developed and implemented a guideline for the inpatient management of jaundiced neonates, with ongoing feedback given to the faculty on group performance. Outcome measures included monthly compliance scores based on American Academy of Pediatrics (AAP) guidelines for management of neonates > 35 weeks' gestation and the percentage of admitted jaundiced, breastfeeding infants whose mothers received lactation consultation during hospitalization. To determine the AAP compliance score, we reviewed and assigned points to each patient admission for completion of a standard evaluation, avoidance of unnecessary intravenous (IV) fluids and peripheral IV line placement, avoidance of rebound bilirubin checks while in the hospital, and the bilirubin level at discharge. Mean monthly AAP compliance scores increased from 60.5% of total possible points during the baseline period (January 2010-December 2010) to 90.4% during the intervention period (January 2011-December 2011). Lactation consultations increased from 48% during our baseline period to 63% during our early intervention period and to 90% during the last 5 months of our intervention. Length of stay was unchanged during the baseline and intervention periods. Interprofessional collaboration between nurses and physicians combined with a thoughtful campaign to increase awareness of published guidelines were successful in improving the care of infants admitted with unconjugated hyperbilirubinemia.

  17. Environmental Assessment of Ground Water Compliance at the Naturita, Colorado, UMTRA Project Site

    International Nuclear Information System (INIS)

    2003-01-01

    This Environmental Assessment addresses the environmental effects of a proposed action and the no action alternative to comply with U.S. Environmental Protection Agency (EPA) ground water standards at the Naturita, Colorado, Uranium Mill Tailings Remedial Action Project site. In 1998, the U.S. Department of Energy (DOE) completed surface cleanup at the site and encapsulated the tailings in a disposal cell 15 miles northwest near the former town of Uravan, Colorado. Ground water contaminants of potential concern at the Naturita site are uranium and vanadium. Uranium concentrations exceed the maximum concentration limit (MCL) of 0.044 milligram per liter (mg/L). Vanadium has no MCL; however, vanadium concentrations exceed the EPA Region III residential risk-based concentration of 0.33 mg/L (EPA 2002). The proposed compliance strategy for uranium and vanadium at the Naturita site is no further remediation in conjunction with the application of alternate concentration limits. Institutional controls with ground water and surface water monitoring will be implemented for these constituents as part of the compliance strategy. This compliance strategy will be protective of human health and the environment. The proposed monitoring program will begin upon regulatory concurrence with the Ground Water Compliance Action Plan (DOE 2002a). Monitoring will consist of verifying that institutional controls remain in place, collecting ground water samples to verify that concentrations of uranium and vanadium are decreasing, and collecting surface water samples to verify that contaminant concentrations do not exceed a regulatory limit or risk-based concentration. If these criteria are not met, DOE would reevaluate the proposed action and determine the need for further National Environmental Policy Act documentation. No comments were received from the public during the public comment period. Two public meetings were held during this period. Minutes of these meetings are included as

  18. New Evaluation of the Electronically Activated Recorder (EAR: Obtrusiveness, Compliance, and Participant Self-selection Effects

    Directory of Open Access Journals (Sweden)

    Joseph H. Manson

    2017-04-01

    Full Text Available The Electronically Activated Recorder (EAR is a method for collecting periodic brief audio snippets of participants’ daily lives using a portable recording device. The EAR can potentially intrude into people’s privacy, alter their natural behavior, and introduce self-selection biases greater than in other types of social science methods. Previous research (Mehl and Holleran, 2007, hereafter M&H has shown that participant non-compliance with, and perceived obtrusiveness of, an EAR protocol are both low. However, these questions have not been addressed in jurisdictions that require the consent of all parties to recording conversations. This EAR study required participants to wear a button bearing a microphone icon and the words “This conversation may be recorded” to comply with California’s all-party consent law. Results revealed self-reported obtrusiveness and non-compliance were actually lower in the present study than in the M&H study. Behaviorally assessed non-compliance did not differ between the two studies. Participants in the present study talked more about being in the study than participants in the M&H study, but such talk still comprised <2% of sampled conversations. Another potential problem with the EAR, participant self-selection bias, was addressed by comparing the EAR volunteers’ HEXACO personality dimensions to a non-volunteer sample drawn from the same student population. EAR volunteers were significantly and moderately higher in Conscientiousness, and lower in Emotionality, than non-volunteers. In conclusion, the EAR method can be successfully implemented in at least one all-party consent state (California. Interested researchers are encouraged to review this procedure with their own legal counsel.

  19. Selective serotonergic excitation of callosal projection neurons

    Directory of Open Access Journals (Sweden)

    Daniel eAvesar

    2012-03-01

    Full Text Available Serotonin (5-HT acting as a neurotransmitter in the cerebral cortex is critical for cognitive function, yet how 5-HT regulates information processing in cortical circuits is not well understood. We tested the serotonergic responsiveness of layer 5 pyramidal neurons (L5PNs of the mouse medial prefrontal cortex (mPFC, and found 3 distinct response types: long-lasting 5-HT1A (1A receptor-dependent inhibitory responses (84% of L5PNs, 5-HT2A (2A receptor-dependent excitatory responses (9%, and biphasic responses in which 2A-dependent excitation followed brief inhibition (5%. Relative to 5-HT-inhibited neurons, those excited by 5-HT had physiological properties characteristic of callosal/commissural (COM neurons that project to the contralateral cortex. We tested whether serotonergic responses in cortical pyramidal neurons are correlated with their axonal projection pattern using retrograde fluorescent labeling of COM and corticopontine-projecting (CPn neurons. 5-HT generated excitatory or biphasic responses in all 5-HT-responsive layer 5 COM neurons. Conversely, CPn neurons were universally inhibited by 5-HT. Serotonergic excitation of COM neurons was blocked by the 2A antagonist MDL 11939, while serotonergic inhibition of CPn neurons was blocked by the 1A antagonist WAY 100635, confirming a role for these two receptor subtypes in regulating pyramidal neuron activity. Selective serotonergic excitation of COM neurons was not layer-specific, as COM neurons in layer 2/3 were also selectively excited by 5-HT relative to their non-labeled pyramidal neuron neighbors. Because neocortical 2A receptors are implicated in the etiology and pathophysiology of schizophrenia, we propose that COM neurons may represent a novel cellular target for intervention in psychiatric disease.

  20. Corruption and compliance: preventive legislations and policies in international business projects

    Directory of Open Access Journals (Sweden)

    Harsh PATHAK

    2013-12-01

    Full Text Available This article seeks to provide an insight on the international phenomenon of corruption, dealing with its existence, and whether compliance is higher with Anti-Corruption laws or with corruption itself, resulting in anti-corruption laws being much less effective than the legislators intended it to be and the reasons for increasing demand worldwide for new governance standards and higher compliance controls and other effective anti-corruption laws and policies in light of rapid increase in corruption every year. This article further deals with the diagnosis and measures to deal with the cause of corruption – the short-comings in anti-corruption law – the reasons why corporations are willing to face continuing legal risks and adverse publicity but still indulge in corrupt practices and the extent of negative impact the prevailing levels of corruption ultimately have on international business and trade. Strict compliance controls are being introduced with increasing enforcement of anti-corruption laws internationally and nations have also started to focus on individual and corporate liability in cases of violation of anti-corruption laws, for both government and private organisations. In this context of far-reaching developments, whether European and South-east Asian Countries like India and International Business Organisations can act in ignorance or buck up and accept this trend, slowly and steadily moving towards a less corrupt nation and International business projects – if not towards a totally corruption free one, keeping in mind the growth of international trade and Commerce and its sustainability.

  1. COST OF TAX COMPLIANCE AND RISK MANAGEMENT IN PROJECTS: THE CASE STUDY OF A SMALL ENTERPRISE

    Directory of Open Access Journals (Sweden)

    Mario Manzini Cianfanelli

    2010-06-01

    Full Text Available This study uses a risk management perspective to analyze compliance costs arising from overlapping service tax (ST jurisdictions. We study the case of an engineering company providing services to the Companhia de Saneamento Básico do Estado de São Paulo [São Paulo State Sanitation Company] – SABESP, a public entity. The engineering company was contracted under public law 8.666/93, to provide engineering service in several townships in São Paulo’s metropolitan area. Because the laws governing bidding do not permit later modification in price or provider, subsequent double taxation by one municipality cut into the firm’s margins, and should other local governments follow suit, multiple taxation would render the contract untenable for the provider. Our paper models the impact of conflicting jurisdictions on administrative burden, psychological costs and profit constriction and discusses project management techniques for decision making and management in similar situations.

  2. DOE`s approach to groundwater compliance on the UMTRA project

    Energy Technology Data Exchange (ETDEWEB)

    Metzler, D. [Dept. of Energy, Washington, DC (United States); Gibb, J.P. [Geraghty and Miller, Inc. (United States); Glover, W.A. [Roy F. Weston, Inc. (United States)

    1993-03-01

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists, a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.

  3. Treatment compliance and challenges among tuberculosis patients across selected health facilities in Osun State Nigeria.

    Science.gov (United States)

    Ajao, K O; Ogundun, O A; Afolabi, O T; Ojo, T O; Atiba, B P; Oguntunase, D O

    2014-12-01

    Tuberculosis (TB) is a major public health problem in the world and Africa has approximately one quarter of the world's cases. One of the greatest challenges facing most TB programmes is the non-compliance to TB treatment among TB patients. This study aimed at determining the challenges of management of tuberculosis (TB) across selected Osun State health facilities. The study employed a descriptive cross-sectional design. A semi-structured questionnaire was used to collect data from 102 TB patients in the health facilities. The instrument measured socio-demographic variables, patient related factors, socio-economic variables, health care system related factors to TB disease and treatment. Data were analysed and summarized using descriptive and inferential statistics. Statistical significance was placed at p facilities (χ2 = 21.761, p facility and patient-related factors were largely responsible.

  4. Utilizing Forced Vital Capacity to Predict Low Lung Compliance and Select Intraoperative Tidal Volume During Thoracic Surgery.

    Science.gov (United States)

    Hoftman, Nir; Eikermann, Eric; Shin, John; Buckley, Jack; Navab, Kaveh; Abtin, Fereidoun; Grogan, Tristan; Cannesson, Maxime; Mahajan, Aman

    2017-12-01

    Tidal volume selection during mechanical ventilation utilizes dogmatic formulas that only consider a patient's predicted body weight (PBW). In this study, we investigate whether forced vital capacity (FVC) (1) correlates better to total lung capacity (TLC) than PBW, (2) predicts low pulmonary compliance, and (3) provides an alternative method for tidal volume selection. One hundred thirty thoracic surgery patients had their preoperative TLC calculated via 2 methods: (1) pulmonary function test (PFT; TLCPFT) and (2) computed tomography 3D reconstruction (TLCCT). We compared the correlation between TLC and PBW with the correlation between TLC and FVC to determine which was stronger. Dynamic pulmonary compliance was then calculated from intraoperative ventilator data and logistic regression models constructed to determine which clinical measure best predicted low compliance. Ratios of tidal volume/FVC plotted against peak inspiratory pressure were utilized to construct a new model for tidal volume selection. Calculated tidal volumes generated by this model were then compared with those generated by the standard lung-protective formula Vt = 7 cc/kg. The correlation between FVC and TLC (0.82 for TLCPFT and 0.76 for TLCCT) was stronger than the correlation between PBW and TLC (0.65 for TLCPFT and 0.58 for TLCCT). Patients with very low compliance had significantly smaller lung volumes (forced expiratory volume at 1 second, FVC, TLC) and lower diffusion capacity of the lungs for carbon monoxide when compared with patients with normal compliance. An FVC cutoff of 3470 cc was 100% sensitive and 51% specific for predicting low compliance. The proposed equation Vt = FVC/8 significantly reduced calculated tidal volume by a mean of 22.5% in patients with low pulmonary compliance without affecting the mean tidal volume in patients with normal compliance (mean difference 0.9%). FVC is more strongly correlated to TLC than PBW and a cutoff of about 3.5 L can be utilized to predict

  5. 49 CFR 268.17 - Project selection criteria.

    Science.gov (United States)

    2010-10-01

    ... criteria will govern FRA's selection of projects to receive funding under the Maglev Deployment Program. (a... are to be expected in the United States. (4) The degree to which the project will augment a Maglev... development status of the Maglev technology selected by the applicant for the project. (c) Benefits for the...

  6. PROJECT PORTFOLIO SELECTION COMPETENCES RESEARCH INUNIVERSITIES OF LITHUANIA

    OpenAIRE

    R #363;ta #268;iutien #279;; Evelina Meilien #279;; Bronius Neverauskas

    2011-01-01

    As a result of the theoretical findings, the paperdemonstrates that projectportfolio selection is crucial project management problem. Successful ProjectPortfolio management requires specific competences.Every project of projectportfolio must be evaluated according to the basedcriteria and parameters.Empirical study was based on framework matrix withfour parameters of projectportfolio selection and only two phases of projectportfolio formation. The r...

  7. Using automated environmental management information systems to enable compliance: Ten questions to answer before selecting a software system

    Energy Technology Data Exchange (ETDEWEB)

    Gilbert, J.B.

    1999-07-01

    As technology invades the arena of environmental information management, hundreds of software packages have become available in the marketplace. How does the already overwhelmed environmental manager or IT professional decide what's right for the organization? Is there a software package that meets the needs of the organization, and is there a successful way to implement the system? Does this require abandoning existing systems with which users are comfortable? Can the system really save time and/or money? This paper discusses three topics: What drives the need for a system; Ten questions to aid in selecting a system that is right for your organization; and enabling technology and software systems available today, and the future application of technology to environmental data management. Motivating factors for EMIS include regulatory, business and IT drivers. Because of the ever-increasing regulatory burden, the need to demonstrate compliance often is the strongest driver. But they cannot ignore business and IT drivers from the discussion, especially with issues such as Enterprise Resource Planning and The Year 2000 impacting many systems projects. Before selecting a system, the organization should address, at a minimum, the following ten issues: (1) Organization objectives; (2) Organization readiness; (3) High-level processes to be automated; (4) Integration and interfaces; (5) User community and needs; (6) Technical requirements; (7) Degree of customization; (8) Project timing; (9) Implementation resource needs; and (10) System justification. Today, there are hundreds of EH and S software packages available too help automate daily business processes. Only a few are multimedia packages, and all require significant implementation efforts. The EMIS market is still evolving, and software vendors continue to enhance product features and usability.

  8. The Added Value of the Project Selection Process

    Directory of Open Access Journals (Sweden)

    Adel Oueslati

    2016-06-01

    Full Text Available The project selection process comes in the first stage of the overall project management life cycle. It does have a very important impact on organization success. The present paper provides defi nitions of the basic concepts and tools related to the project selection process. It aims to stress the added value of this process for the entire organization success. The mastery of the project selection process is the right way for any organization to ensure that it will do the right project with the right resources at the right time and within the right priorities

  9. Ascorbic acid selectively improves large elastic artery compliance in postmenopausal women.

    Science.gov (United States)

    Moreau, Kerrie L; Gavin, Kathleen M; Plum, Angela E; Seals, Douglas R

    2005-06-01

    The compliance of large elastic arteries in the cardiothoracic region decreases with advancing age/menopause and plays an important role in the increased prevalence of cardiovascular diseases in postmenopausal women. We determined whether oxidative stress contributes to the reduced large elastic artery compliance of postmenopausal women. Carotid artery compliance was measured during acute intravenous infusions of saline (baseline control) and supraphysiological doses of the potent antioxidant ascorbic acid in premenopausal (n=10; 23+/-1; mean+/-SE) and estrogen-deficient postmenopausal (n=21; 55+/-1 years) healthy sedentary women. Carotid artery compliance was 56% lower in postmenopausal compared with premenopausal women during baseline control (PAscorbic acid infusion increased carotid artery compliance by 26% in postmenopausal women (1.11+/-0.07 to 1.38+/-0.08 mm2/mm Hgx10(-1); Pascorbic acid. In the pooled population, the change in arterial compliance with ascorbic acid correlated with baseline waist-to-hip ratio (r=0.56; P=0.001), plasma norepinephrine (r=0.58; P=0.001), and LDL cholesterol (r=0.54; P=0.001). These results suggest that oxidative stress may be an important mechanism contributing to the reduced large elastic artery compliance of sedentary, estrogen-deficient postmenopausal women. Increased abdominal fat storage, sympathetic nervous system activity, and LDL cholesterol may be mechanistically involved in oxidative stress-associated suppression of arterial compliance in postmenopausal women.

  10. Combining AHP and DEA Methods for Selecting a Project Manager

    Directory of Open Access Journals (Sweden)

    Baruch Keren

    2014-07-01

    Full Text Available A project manager has a major influence on the success or failure of the project. A good project manager can match between the strategy and objectives of the organization and the goals of the project. Therefore, the selection of the appropriate project manager is a key factor for the success of the project. A potential project manager is judged by his or her proven performance and personal qualifications. This paper proposes a method to calculate the weighted scores and the full rank of candidates for managing a project, and to select the best of those candidates. The proposed method combines specific methodologies: the Data Envelopment Analysis (DEA and the Analytical Hierarchical Process (AHP and uses DEA Ranking Methods to enhance selection.

  11. Revenue-Maximizing Radio Access Technology Selection with Net Neutrality Compliance in Heterogeneous Wireless Networks

    Directory of Open Access Journals (Sweden)

    Elissar Khloussy

    2018-01-01

    Full Text Available The net neutrality principle states that users should have equal access to all Internet content and that Internet Service Providers (ISPs should not practice differentiated treatment on any of the Internet traffic. While net neutrality aims to restrain any kind of discrimination, it also grants exemption to a certain category of traffic known as specialized services (SS, by allowing the ISP to dedicate part of the resources for the latter. In this work, we consider a heterogeneous LTE/WiFi wireless network and we investigate revenue-maximizing Radio Access Technology (RAT selection strategies that are net neutrality-compliant, with exemption granted to SS traffic. Our objective is to find out how the bandwidth reservation for SS traffic would be made in a way that allows maximizing the revenue while being in compliance with net neutrality and how the choice of the ratio of reserved bandwidth would affect the revenue. The results show that reserving bandwidth for SS traffic in one RAT (LTE can achieve higher revenue. On the other hand, when the capacity is reserved across both LTE and WiFi, higher social benefit in terms of number of admitted users can be realized, as well as lower blocking probability for the Internet access traffic.

  12. Selection of a portfolio of R & D projects

    NARCIS (Netherlands)

    Casault, Sébastien; Groen, Arend J.; Linton, J.D.; Linton, Jonathan; Link, A.N.; Vonortas, N.S.

    2013-01-01

    While portfolios of research are increasingly discussed, a portfolio perspective is infrequently taken when selecting two or more projects. Consequently, this chapter considers the current state of knowledge in project and portfolio selection, identifies why we can and cannot apply knowledge from

  13. 7 CFR 1944.529 - Project selection.

    Science.gov (United States)

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) RURAL HOUSING SERVICE, RURAL BUSINESS... administering its programs. (3) The effectiveness of the current efforts by the applicant to assist low-income...-354 office. (10) The extent to which the project will be cost effective, including but not limited to...

  14. A fuzzy hybrid approach for project manager selection

    Directory of Open Access Journals (Sweden)

    Ahmad Jafarnejad Chaghooshi

    2016-09-01

    Full Text Available Suitable project manager has a significant impact on successful accomplishment of the project. Managers should possess such skills in order to effectively cope with the competition. In this respect, selecting managers based on their skills can lead to a competitive advantage towards the achievement of organizational goals. selection of the suitable project manager can be viewed as a multi-criteria decision making (MCDM problem and an extensive evaluation of criteria, such as Technical skills, experience skills, Personal qualities and the related criteria must be considered in the selection process of project manager. The fuzzy set theory and MCDM methods appears as an essential tools to provide a decision framework that incorporates imprecise judgments and multi criteria nature of project manager selection process inherent in this process. This paper proposes the joint use of the Fuzzy DEMATEL (FDEMATEL and Fuzzy VIKOR methods for the decision-making process of selecting the most suitable managers for projects. First, with the opinions of the senior managers based on project management competency model (ICB-IPMA, all the criteria required for the selection are gathered. Then the FDEMATEL method is used to prioritize the importance of various criteria and FVIKOR used to rank the alternatives in a preferred order to select the best project managers from a number of alternatives. Next, a real case study used to illustrate the process of the proposed method. Finally, some conclusions are discussed at the end of this study.

  15. Compliance status summaries for federal and state statutory directives that apply to the Salt Repository Project at the Deaf Smith County Site, Texas

    International Nuclear Information System (INIS)

    1986-07-01

    This document contains statutory summaries, checklists of compliance requirements, status summaries, and lists of information needs for the environmental and health and safety statutory directives at Federal and State levels that apply to the Salt Repository Project at the Deaf Smith County Site, Texas. Statutes that apply in general to any repository project but not specifically to the Deaf Smith are not included. The information herein supplements the Salt Repository Project Statutory Compliance Plan and the Salt Repository Project Permitting Management Plan by providing lengthy details on statutory directives, compliance requirements, information needs, and the overall status of the environmental and health and safety compliance program for the Salt Repository Project at the Deaf Smith County Site, Texas

  16. Combinatorial Optimization in Project Selection Using Genetic Algorithm

    Science.gov (United States)

    Dewi, Sari; Sawaluddin

    2018-01-01

    This paper discusses the problem of project selection in the presence of two objective functions that maximize profit and minimize cost and the existence of some limitations is limited resources availability and time available so that there is need allocation of resources in each project. These resources are human resources, machine resources, raw material resources. This is treated as a consideration to not exceed the budget that has been determined. So that can be formulated mathematics for objective function (multi-objective) with boundaries that fulfilled. To assist the project selection process, a multi-objective combinatorial optimization approach is used to obtain an optimal solution for the selection of the right project. It then described a multi-objective method of genetic algorithm as one method of multi-objective combinatorial optimization approach to simplify the project selection process in a large scope.

  17. Target selection for the HRIBF Project

    International Nuclear Information System (INIS)

    Dellwo, J.; Alton, G.D.; Batchelder, J.C.

    1994-01-01

    Experiments are in progress at the Oak Ridge National Laboratory (ORNL) which are designed to select the most appropriate target materials for generating particular radioactive ion beams for the Holifield Radioactive Ion Beam Facility (HRIBF). The 25-MV tandem accelerator is used to implant stable complements of interesting radioactive elements into refractory targets mounted in a high-temperature FEBIAD ion source which is on-line at the UNISOR facility. These experiments permit selection of the target material most appropriate for the rapid release of the element of interest, as well as realistic estimates of the efficiency of the FEBIAD source. From diffusion release data information on the release times and diffusion coefficients can be derived. Diffusion coefficients for CI implanted into and diffused from CeS and Zr 5 Si 3 and As, Br, and Se implanted into and diffused from Zr 5 Ge 3 have been derived from the resulting intensity versus time profiles

  18. Evaluation of the WIPP Project's compliance with the EPA radiation protection standards for disposal of transuranic waste

    International Nuclear Information System (INIS)

    Neill, R.H.; Chaturvedi, L.; Rucker, D.F.; Silva, M.K.; Walker, B.A.; Channell, J.K.; Clemo, T.M.

    1998-03-01

    The US Environmental Protection Agency's (EPA) proposed rule to certify that the Waste Isolation Pilot Plant (WIPP) meets compliance with the long-term radiation protection standards for geologic repositories (40CFR191 Subparts B and C), is one of the most significant milestones to date for the WIPP project in particular, and for the nuclear waste issue in general. The Environmental Evaluation Group (EEG) has provided an independent technical oversight for the WIPP project since 1978, and is responsible for many improvements in the location, design, and testing of various aspects of the project, including participation in the development of the EPA standards since the early 1980s. The EEG reviewed the development of documentation for assessing the WIPP's compliance by the Sandia National Laboratories following the 1985 promulgation by EPA, and provided many written and verbal comments on various aspects of this effort, culminating in the overall review of the 1992 performance assessment. For the US Department of Energy's (DOE) compliance certification application (CCA), the EEG provided detailed comments on the draft CCA in March, 1996, and additional comments through unpublished letters in 1997 (included as Appendices 8.1 and 8.2 in this report). Since the October 30, 1997, publication of the EPA's proposed rule to certify WIPP, the EEG gave presentations on important issues to the EPA on December 10, 1997, and sent a December 31, 1997 letter with attachments to clarify those issues (Appendix 8.3). The EEG has raised a number of questions that may have an impact on compliance. In spite of the best efforts by the EEG, the EPA reaction to reviews and suggestions has been slow and apparently driven by legal considerations. This report discusses in detail the questions that have been raised about containment requirements. Also discussed are assurance requirements, groundwater protection, individual protection, and an evaluation of EPA's responses to EEG's comments

  19. Project Selection for NASA's R&D Programs

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of NASA s Research and Development (R&D) programs is to provide advanced human support technologies for the Exploration Systems Mission Directorate (ESMD). The new technologies must be sufficiently attractive and proven to be selectable for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are likely options for flight. The R&D programs must select an array of technology development projects, manage them, and either terminate or continue them, so as to maximize the delivered number of potentially usable advanced human support technologies. This paper proposes an effective project selection methodology to help manage NASA R&D project portfolios.

  20. Selection of projects in the regional energy planning

    International Nuclear Information System (INIS)

    Ramirez P, R.; Navas M, F.

    1993-01-01

    The processes of regional energy planning have changed vastly in the last years and it will continue changing in the future for the new norm of the State. This work tries to show the use of systematic tools in the selection of regional energy projects. It discusses a methodology of selection of projects based on a multivariate technical. It is applied in the Southwestern region of Colombia and both selection and priority results are obtained. The designed methodology allows to make the selection of projects in an automatic way with a software designed for such an end. In the case of Southwestern it arrives to a briefcase of projects for an energy plan and made for other races

  1. R and D programmes in Germany. Selection and evaluation of projects

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    In Germany, budgets for research and development rest on three pillars, which are the federal government, the 16 states, and the civil sector. The total expenditure for 1997 amounted to 83.7 times 1 billion Deutsche marks, and this occupied 2.3 of Germany's GNP (gross national product). National research projects constitute the main stream even today. As for federal government-financed projects, they are managed mainly by BMBF (Federal Ministry of Education, Science, Research, and Technology). There are project carriers as the managerial organizations. Requests for proposals for research and development projects are published in official gazettes and technical journals. Such a project has to contain detailed descriptions regarding the setting of targets, levels of technology, cost accounting, development schedule, history of discovery and development involved, etc. Analyses are conducted into technology, economic risk, market, and environmental impact. Support by the German government for government-related projects is given in compliance with predetermined guidelines. The evaluation and selection of submitted proposals are performed by professionals of the project carrier level. In this paper, explanations are also given about contracts, management of progress, and evaluation. (NEDO)

  2. METHODS OF SELECTING THE EFFECTIVE MODELS OF BUILDINGS REPROFILING PROJECTS

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2016-02-01

    Full Text Available The article highlights the important task of project management in reprofiling of buildings. It is expedient to pay attention to selecting effective engineering solutions to reduce the duration and cost reduction at the project management in the construction industry. This article presents a methodology for the selection of efficient organizational and technical solutions for the reconstruction of buildings reprofiling. The method is based on a compilation of project variants in the program Microsoft Project and experimental statistical analysis using the program COMPEX. The introduction of this technique in the realigning of buildings allows choosing efficient models of projects, depending on the given constraints. Also, this technique can be used for various construction projects.

  3. The process of selecting technology development projects: a practical framework

    NARCIS (Netherlands)

    Herps, Joost M.J.; van Mal, Herman H.; Halman, Johannes I.M.; Martens, Jack H.M.; Borsboom, Ron H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  4. The process of selecting technology development projects : a practical framework

    NARCIS (Netherlands)

    Herps, J.M.J.; Mal, van H.H.; Halman, J.I.M.; Martens, J.H.M.; Borsboom, R.H.M.

    2003-01-01

    In this article a practical framework is proposed, that can be used to organise the activities related to the selection-process of technology development projects. The framework is based upon recent literature and application at DAF Trucks Company. A technology development project has a long way to

  5. Understanding the selection processes of public research projects

    NARCIS (Netherlands)

    Materia, V.C.; Pascucci, S.; Kolympiris, C.

    2015-01-01

    This paper analyses factors that affect the funding of agricultural research projects by regional governments and other regional public authorities. We study the selection process of agricultural research projects funded by the emilia Romagna regional government in Italy, which follows funding

  6. Compliance Framing - Framing Compliance

    OpenAIRE

    Lutz-Ulrich Haack; Martin C. Reimann

    2012-01-01

    Corporations have to install various organizational measures to comply with legal as well as internal guidelines systematically. Compliance management systems have the challenging task to make use of an internal compliance-marketing approach in order to ensure not only an adequate but also effective compliance-culture. Compliance-literature and findings of persuasive goal-framing-theory give opposite implications for establishing a rather values- versus rule-based compliance-culture respectiv...

  7. EPRtm project experience: selection of partners and supply chain

    International Nuclear Information System (INIS)

    Lorenzo, D. de

    2012-01-01

    With 4 EPR T M units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  8. NPD project portfolio selection using reinvestment strategy in competitive environment

    Directory of Open Access Journals (Sweden)

    Alireza Ghassemi

    2018-01-01

    Full Text Available This study aims to design a new model for selecting most fitting new product development projects in a pool of projects. To catch the best model, we assume new products will be introduced to the competitive markets. Also, we suppose the revenue yielded by completed projects can be reinvested on implementation of other projects. Other sources of financing are borrowing loans from banks and initial capital of the firm. These limited resources determine most evaluated projects to be performed. Several types of interactions among different projects are considered to make the chosen projects more like a portfolio. In addition, some numerical examples from the real world are provided to demonstrate the applicability of the proposed model. These examples show how the particular considerations in the suggested model affect the results.

  9. Site selection for controversial projects: reflections on the MRS experience

    International Nuclear Information System (INIS)

    Sigmon, E.B.; Marland, G.

    1987-01-01

    Projects for waste management, power production, and a host of other socially useful functions frequently falter because of local opposition. Students of the siting dilemma have prescribed accommodation of local interests through negotiation and compensation, but they offer little advice on the site selection itself. The negotiated compensation approach to siting frequently fails because localities refuse to negotiate. The authors argue that methods of site selection and developers' initial stance toward local communities affect communities' propensity to negotiate. Site selection strategies and their influence on project acceptability are examined, using the Department of Energy's Monitored Retrievable Storage proposal as a point of departure. 14 refs

  10. Selecting a Sustainable Disinfection Technique for Wastewater Reuse Projects

    Directory of Open Access Journals (Sweden)

    Jorge Curiel-Esparza

    2014-09-01

    Full Text Available This paper presents an application of the Analytical Hierarchy Process (AHP by integrating a Delphi process for selecting the best sustainable disinfection technique for wastewater reuse projects. The proposed methodology provides project managers a tool to evaluate problems with multiple criteria and multiple alternatives which involve non-commeasurable decision criteria, with expert opinions playing a major role in the selection of these treatment technologies. Five disinfection techniques for wastewater reuse have been evaluated for each of the nine criteria weighted according to the opinions of consulted experts. Finally, the VIKOR method has been applied to determine a compromise solution, and to establish the stability of the results. Therefore, the expert system proposed to select the optimal disinfection alternative is a hybrid method combining the AHP with the Delphi method and the VIKOR technique, which is shown to be appropriate in realistic scenarios where multiple stakeholders are involved in the selection of a sustainable disinfection technique for wastewater reuse projects.

  11. Applying a Hybrid MCDM Model for Six Sigma Project Selection

    Directory of Open Access Journals (Sweden)

    Fu-Kwun Wang

    2014-01-01

    Full Text Available Six Sigma is a project-driven methodology; the projects that provide the maximum financial benefits and other impacts to the organization must be prioritized. Project selection (PS is a type of multiple criteria decision making (MCDM problem. In this study, we present a hybrid MCDM model combining the decision-making trial and evaluation laboratory (DEMATEL technique, analytic network process (ANP, and the VIKOR method to evaluate and improve Six Sigma projects for reducing performance gaps in each criterion and dimension. We consider the film printing industry of Taiwan as an empirical case. The results show that our study not only can use the best project selection, but can also be used to analyze the gaps between existing performance values and aspiration levels for improving the gaps in each dimension and criterion based on the influential network relation map.

  12. Space Projects: Improvements Needed in Selecting Future Projects for Private Financing

    Science.gov (United States)

    1990-01-01

    The Office of Management and Budget (OMB) and NASA jointly selected seven projects for commercialization to reduce NASA's fiscal year 1990 budget request and to help achieve the goal of increasing private sector involvement in space. However, the efforts to privately finance these seven projects did not increase the commercial sector's involvement in space to the extent desired. The General Accounting Office (GAO) determined that the projects selected were not a fair test of the potential of increasing commercial investment in space at an acceptable cost to the government, primarily because the projects were not properly screened. That is, neither their suitability for commercialization nor the economic consequences of seeking private financing for them were adequately evaluated before selection. Evaluations and market tests done after selection showed that most of the projects were not viable candidates for private financing. GAO concluded that projects should not be removed from NASA's budget for commercial development until after careful screening has been done to determine whether adequate commercial demand exists, development risks are commercially acceptable and private financing is found or judged to be highly likely, and the cost effectiveness of such a decision is acceptable. Premature removal of projects from NASA's budget ultimately can cause project delays and increased costs when unsuccessful commercialization candidates must be returned to the budget. NASA also needs to ensure appropriate comparisons of government and private financing options for future commercialization projects.

  13. Selecting Large Portfolios of Social Projects in Public Organizations

    Directory of Open Access Journals (Sweden)

    Igor Litvinchev

    2014-01-01

    Full Text Available We address the portfolio selection of social projects in public organizations considering interdependencies (synergies affecting project funds requirements and tasks. A mixed integer linear programming model is proposed incorporating the most relevant aspects of the problem found in the literature. The model supports both complete (all or nothing and partial (a certain amount from a given interval of funding resource allocation policies. Numerical results for large-scale problem instances are presented.

  14. Compliance Monitoring of Underwater Blasting for Rock Removal at Warrior Point, Columbia River Channel Improvement Project, 2009/2010

    Energy Technology Data Exchange (ETDEWEB)

    Carlson, Thomas J.; Johnson, Gary E.; Woodley, Christa M.; Skalski, J. R.; Seaburg, Adam

    2011-05-10

    The U.S. Army Corps of Engineers, Portland District (USACE) conducted the 20-year Columbia River Channel Improvement Project (CRCIP) to deepen the navigation channel between Portland, Oregon, and the Pacific Ocean to allow transit of fully loaded Panamax ships (100 ft wide, 600 to 700 ft long, and draft 45 to 50 ft). In the vicinity of Warrior Point, between river miles (RM) 87 and 88 near St. Helens, Oregon, the USACE conducted underwater blasting and dredging to remove 300,000 yd3 of a basalt rock formation to reach a depth of 44 ft in the Columbia River navigation channel. The purpose of this report is to document methods and results of the compliance monitoring study for the blasting project at Warrior Point in the Columbia River.

  15. Six Sigma Project Selection Using Fuzzy TOPSIS Decision Making Approach

    Directory of Open Access Journals (Sweden)

    Rajeev Rathi

    2015-05-01

    Full Text Available Six Sigma is considered as a logical business strategy that attempts to identify and eliminate the defects or failures for improving the quality of product and processes. A decision on project selection in Six Sigma is always very critical; it plays a key role in successful implementation of Six Sigma. Selection of a right Six Sigma project is essentially important for an automotive company because it greatly influences the manufacturing costs. This paper discusses an approach for right Six Sigma project selection at an automotive industry using fuzzy logic based TOPSIS method. The fuzzy TOPSIS is a well recognized tool to undertake the fuzziness of the data involved in choosing the right preferences. In this context, evaluation criteria have been designed for selection of best alternative. The weights of evaluation criteria are calculated by using the MDL (modified digital logic method and final ranking is calculated through priority index obtained by using fuzzy TOPSIS method. In the selected case study, this approach has rightly helped to identify the right project for implementing Six Sigma for achieving improvement in productivity.

  16. Exploring project selection behavior of academic scientists in India

    OpenAIRE

    Anju Chawla

    2007-01-01

    This study is based on retrospective accounts of a stratified sample of about 1,100 academic scien-tists in India on the criteria actually used by them in the choice of research projects. A basic objective is to examine the effects of contextual factors such as academic rank, institutional and disciplinary setting, and sources of research funds on the choice of research projects. A struc-tured questionnaire was used to tap the criteria for project selection. The items were factor-analyzed and...

  17. Project Selection in the Design Studio: Absence of Learning Environments

    Science.gov (United States)

    Basa, Inci

    2010-01-01

    Project selection is an essential matter of design teaching. Based on observations of a specific curriculum, the author claims that a wide repertoire of subjects including offices, restaurants, hotels, and other public places are used to prepare design students, but that schools and other "learning environments/ schools" are similarly…

  18. Performance assessment in support of compliance certification application for the WIPP project

    International Nuclear Information System (INIS)

    Jow, H.N.; Anderson, D.R.; Marietta, M.; Helton, J.; Basabilvazo, G.

    1998-03-01

    The Waste Isolation Pilot Plant (WIPP) is being developed by the US Department of Energy for the geologic (deep underground) disposal of transuranic (TRU) waste. A Compliance Certification Application (CCA) of the WIPP (1) for such disposal was submitted to the US Environmental Protection Agency (EPA) in October, 1996, and is currently under review, with a decision anticipated in late 1997. An important component of the CCA is a performance assessment (PA) for the WIPP carried out by Sandia National Laboratories. The final outcome of the PA is a complementary cumulative distribution function (CCDF) for radionuclide releases from the WIPP to the accessible environment and an assessment of the confidence with which this CCDF can be estimated. This paper describes the computational process used to develop the CCDF. The results of uncertainty and sensitivity analysis are also presented

  19. Ground-water monitoring compliance projects for Hanford Site facilities: Annual progress report for 1987

    International Nuclear Information System (INIS)

    Hall, S.H.

    1988-09-01

    This report describes progress during 1987 of five Hanford Site ground water monitoring projects. Four of these projects are being conducted according to regulations based on the federal Resource Conservation and Recovery Act of 1976 and the state Hazardous Waste Management Act. The fifth project is being conducted according to regulations based on the state Solid Waste Management Act. The five projects discussed herein are: 300 Area Process Trenches; 183-H Solar Evaporation Basins; 200 Areas Low-Level Burial Grounds; Nonradioactive Dangerous Waste Landfill; Solid Waste Landfill. For each of the projects, there are included, as applicable, discussions of monitoring well installations, water-table measurements, background and/or downgradient water quality and results of chemical analysis, and extent and rate of movement of contaminant plumes. 14 refs., 30 figs., 13 tabs

  20. 76 FR 62312 - Multi-Agency Informational Meeting Concerning Compliance With the Federal Select Agent Program...

    Science.gov (United States)

    2011-10-07

    ... interested individuals to obtain specific regulatory guidance and information on standards concerning biosafety and biosecurity issues related to the Federal Select Agent Program. CDC, APHIS, and CJIS...

  1. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    Science.gov (United States)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of

  2. Breathing circuit compliance and accuracy of displayed tidal volume during pressure-controlled ventilation of infants: A quality improvement project.

    Science.gov (United States)

    Glenski, Todd A; Diehl, Carrie; Clopton, Rachel G; Friesen, Robert H

    2017-09-01

    Anesthesia machines have evolved to deliver desired tidal volumes more accurately by measuring breathing circuit compliance during a preuse self-test and then incorporating the compliance value when calculating expired tidal volume. The initial compliance value is utilized in tidal volume calculation regardless of whether the actual compliance of the breathing circuit changes during a case, as happens when corrugated circuit tubing is manually expanded after the preuse self-test but before patient use. We noticed that the anesthesia machine preuse self-test was usually performed on nonexpanded pediatric circuit tubing, and then the breathing circuit was subsequently expanded for clinical use. We aimed to demonstrate that performing the preuse self-test in that manner could lead to incorrectly displayed tidal volume on the anesthesia machine monitor. The goal of this quality improvement project was to change the usual practice and improve the accuracy of displayed tidal volume in infants undergoing general anesthesia. There were four stages of the project: (i) gathering baseline data about the performance of the preuse self-test and using infant and adult test lungs to measure discrepancies of displayed tidal volumes when breathing circuit compliance was changed after the initial preuse self-test; (ii) gathering clinical data during pressure-controlled ventilation comparing anesthesia machine displayed tidal volume with actual spirometry tidal volume in patients less than 10 kg before (machine preuse self-test performed while the breathing circuit was nonexpanded) and after an intervention (machine preuse self-test performed after the breathing circuit was fully expanded); (iii) performing department-wide education to help implement practice change; (iv) gathering postintervention data to determine the prevalence of proper machine preuse self-test. At constant pressure-controlled ventilation through fully expanded circuit tubing, displayed tidal volume was 83

  3. Selecting downscaled climate projections for water resource impacts and adaptation

    Science.gov (United States)

    Vidal, Jean-Philippe; Hingray, Benoît

    2015-04-01

    Increasingly large ensembles of global and regional climate projections are being produced and delivered to the climate impact community. However, such an enormous amount of information can hardly been dealt with by some impact models due to computational constraints. Strategies for transparently selecting climate projections are therefore urgently needed for informing small-scale impact and adaptation studies and preventing potential pitfalls in interpreting ensemble results from impact models. This work proposes results from a selection approach implemented for an integrated water resource impact and adaptation study in the Durance river basin (Southern French Alps). A large ensemble of 3000 daily transient gridded climate projections was made available for this study. It was built from different runs of 4 ENSEMBLES Stream2 GCMs, statistically downscaled by 3 probabilistic methods based on the K-nearest neighbours resampling approach (Lafaysse et al., 2014). The selection approach considered here exemplifies one of the multiple possible approaches described in a framework for identifying tailored subsets of climate projections for impact and adaptation studies proposed by Vidal & Hingray (2014). It was chosen based on the specificities of both the study objectives and the characteristics of the projection dataset. This selection approach aims at propagating as far as possible the relative contributions of the four different sources of uncertainties considered, namely GCM structure, large-scale natural variability, structure of the downscaling method, and catchment-scale natural variability. Moreover, it took the form of a hierarchical structure to deal with the specific constraints of several types of impact models (hydrological models, irrigation demand models and reservoir management models). The implemented 3-layer selection approach is therefore mainly based on conditioned Latin Hypercube sampling (Christierson et al., 2012). The choice of conditioning

  4. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Science.gov (United States)

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Down-selection of one or more Maglev projects for... Procedures For Financial Assistance § 268.21 Down-selection of one or more Maglev projects for further study... completion of Phase III of the Maglev Deployment Program, FRA will down-select one or more projects to...

  5. NASA: Assessments of Selected Large-Scale Projects

    Science.gov (United States)

    2011-03-01

    REPORT DATE MAR 2011 2. REPORT TYPE 3. DATES COVERED 00-00-2011 to 00-00-2011 4. TITLE AND SUBTITLE Assessments Of Selected Large-Scale Projects...Volatile EvolutioN MEP Mars Exploration Program MIB Mishap Investigation Board MMRTG Multi Mission Radioisotope Thermoelectric Generator MMS Magnetospheric...probes designed to explore the Martian surface, to satellites equipped with advanced sensors to study the earth , to telescopes intended to explore the

  6. 77 FR 56845 - Multi-Agency Informational Meeting Concerning Compliance With the Federal Select Agent Program...

    Science.gov (United States)

    2012-09-14

    ... regulatory guidance and information on standards concerning biosafety, biosecurity and incident response... Laboratory Registration for Possession, Use, and Transfer of Select Agents and Toxins (APHIS/CDC Form 1...

  7. Performance assessment of select covers and disposal cell compliance with EPA [Environmental Protection Agency] groundwater standards

    International Nuclear Information System (INIS)

    1989-06-01

    This document describes the technical approach to the assessment of the performance of a full component topslope cover, three sideslope covers, and hence the way in which a Uranium Mill Tailings Remedial Action (UMTRA) Project disposal cell complies with the US Environmental Protection Agency (EPA) groundwater protection standards. 4 refs

  8. Minimizing Project Cost by Integrating Subcontractor Selection Decisions with Scheduling

    Science.gov (United States)

    Biruk, Sławomir; Jaśkowski, Piotr; Czarnigowska, Agata

    2017-10-01

    Subcontracting has been a worldwide practice in the construction industry. It enables the construction enterprises to focus on their core competences and, at the same time, it makes complex project possible to be delivered. Since general contractors bear full responsibility for the works carried out by their subcontractors, it is their task and their risk to select a right subcontractor for a particular work. Although subcontractor management has been admitted to significantly affect the construction project’s performance, current practices and past research deal with subcontractor management and scheduling separately. The proposed model aims to support subcontracting decisions by integrating subcontractor selection with scheduling to enable the general contractor to select the optimal combination of subcontractors and own crews for all work packages of the project. The model allows for the interactions between the subcontractors and their impacts on the overall project performance in terms of cost and, indirectly, time and quality. The model is intended to be used at the general contractor’s bid preparation stage. The authors claim that the subcontracting decisions should be taken in a two-stage process. The first stage is a prequalification - provision of a short list of capable and reliable subcontractors; this stage is not the focus of the paper. The resulting pool of available resources is divided into two subsets: subcontractors, and general contractor’s in-house crews. Once it has been defined, the next stage is to assign them to the work packages that, bound by fixed precedence constraints, form the project’s network diagram. Each package is possible to be delivered by the general contractor’s crew or some of the potential subcontractors, at a specific time and cost. Particular crews and subcontractors can be contracted more than one package, but not at the same time. Other constraints include the predefined project completion date (the project is

  9. A CONCEPTUAL MODEL FOR IMPROVED PROJECT SELECTION AND PRIORITISATION

    Directory of Open Access Journals (Sweden)

    P. J. Viljoen

    2012-01-01

    Full Text Available

    ENGLISH ABSTRACT: Project portfolio management processes are often designed and operated as a series of stages (or project phases and gates. However, the flow of such a process is often slow, characterised by queues waiting for a gate decision and by repeated work from previous stages waiting for additional information or for re-processing. In this paper the authors propose a conceptual model that applies supply chain and constraint management principles to the project portfolio management process. An advantage of the proposed model is that it provides the ability to select and prioritise projects without undue changes to project schedules. This should result in faster flow through the system.

    AFRIKAANSE OPSOMMING: Prosesse om portefeuljes van projekte te bestuur word normaalweg ontwerp en bedryf as ’n reeks fases en hekke. Die vloei deur so ’n proses is dikwels stadig en word gekenmerk deur toue wat wag vir besluite by die hekke en ook deur herwerk van vorige fases wat wag vir verdere inligting of vir herprosessering. In hierdie artikel word ‘n konseptuele model voorgestel. Die model berus op die beginsels van voorsieningskettings sowel as van beperkingsbestuur, en bied die voordeel dat projekte geselekteer en geprioritiseer kan word sonder onnodige veranderinge aan projekskedules. Dit behoort te lei tot versnelde vloei deur die stelsel.

  10. 76 FR 17617 - Multi-Agency Informational Meeting Concerning Compliance With the Federal Select Agent Program...

    Science.gov (United States)

    2011-03-30

    ... assessments, biosafety requirements, and security measures. DATES: The meeting will be held on May 10, 2011...) and other interested individuals to obtain specific regulatory guidance and information on standards concerning biosafety and biosecurity issues related to the Federal Select Agent Program. CDC, APHIS, and FBI...

  11. 6430.1A Compliance Matrix for 241-SY-101 Surface Level Rise Remediation Project

    International Nuclear Information System (INIS)

    ERHART, M.F.

    2001-01-01

    The purpose of this document is to record the design attributes of the RAPID Mitigation System which fulfill the pertinent requirements specified in DOE Order 6430.1A-General Design Criteria. Those pertinent Order requirements which are not met by the project at the time of the release of this document are recorded and noted as open items in Section 4.0-Conclusions

  12. Activity modes selection for project crashing through deterministic simulation

    Directory of Open Access Journals (Sweden)

    Ashok Mohanty

    2011-12-01

    Full Text Available Purpose: The time-cost trade-off problem addressed by CPM-based analytical approaches, assume unlimited resources and the existence of a continuous time-cost function. However, given the discrete nature of most resources, the activities can often be crashed only stepwise. Activity crashing for discrete time-cost function is also known as the activity modes selection problem in the project management. This problem is known to be NP-hard. Sophisticated optimization techniques such as Dynamic Programming, Integer Programming, Genetic Algorithm, Ant Colony Optimization have been used for finding efficient solution to activity modes selection problem. The paper presents a simple method that can provide efficient solution to activity modes selection problem for project crashing.Design/methodology/approach: Simulation based method implemented on electronic spreadsheet to determine activity modes for project crashing. The method is illustrated with the help of an example.Findings: The paper shows that a simple approach based on simple heuristic and deterministic simulation can give good result comparable to sophisticated optimization techniques.Research limitations/implications: The simulation based crashing method presented in this paper is developed to return satisfactory solutions but not necessarily an optimal solution.Practical implications: The use of spreadsheets for solving the Management Science and Operations Research problems make the techniques more accessible to practitioners. Spreadsheets provide a natural interface for model building, are easy to use in terms of inputs, solutions and report generation, and allow users to perform what-if analysis.Originality/value: The paper presents the application of simulation implemented on a spreadsheet to determine efficient solution to discrete time cost tradeoff problem.

  13. The ENTRIA project. Selected disciplinary and interdisciplinary research topics

    International Nuclear Information System (INIS)

    Roehlig, Klaus-Juergen; Hocke, Peter; Walther, Clemens

    2015-01-01

    ENTRIA (''Disposal Options for Radioactive Residues: Interdisciplinary Analyses and Development of Evaluation Principles'', www.entria.de) is a joint research project carried out by twelve departments and institutes from German universities and major research institutions and one partner from Switzerland. It is financed by the German Ministry of Education and Research (BMBF). Scientists representing natural sciences, civil engineering, philosophy, law, social and political sciences, and technology assessment carry out disciplinary and interdisciplinary research addressing three options to manage especially high-level radioactive waste: - Final disposal in deep geological formations without any arrangements for retrieval, - disposal in deep geological formations with arrangements for monitoring and retrieval, and - (prolonged) surface (or near-surface) storage. In the paper, the following selected research topics - both disciplinary and interdisciplinary - are briefly introduced in order to provide an impression of the project scope: - Surface storage, - reference concepts for emplacement in deep geological formations with retrievability and monitoring, - radiation exposure and justification of measures, - interdisciplinary perspectives on dose limits, - comparative studies on nuclear waste governance, - nuclear waste governance in Switzerland, - public involvement and the German Site Selection Act, and - citizens' jury.

  14. The perception of corporate services directorate in a metropolitan municipality on King III good governance compliance in business and projects

    Directory of Open Access Journals (Sweden)

    Sly Newton Mutiro

    2015-03-01

    Full Text Available Good governance has been and is a growing phenomenon for many business organisations regardless of size, profit margins and purpose for existence. The South African Metropolitan municipality Metropolitan Municipality is one such organisation that has adopted good governance models to business practices. The challenge was how to effectively and efficiently implement governance issues around projects and business organisations. A number of people, committees and institutions have developed different governance frameworks that can be adopted by organisations as a guide to good governance. This research is based on King III guide to good governance. The objective was to establish the perceptions of the corporate services directorate in the South African Metropolitan municipality municipality on King III good governance compliance by interviewing some employees orally and through a questionnaire. The responses were captured and analysed using IMB SPSS software. Problems were identified in governance training and understanding in general. Another major finding was poor communication internally and externally. To overcome these shortfall recommendations were made. Communication models, communication plan, governance models and training were recommended. The major challenges facing the South African Metropolitan municipality Metropolitan Municipality are poor effective governance communication and lack of governance training.

  15. Applicability of federal and state environmental requirements to selected DOE field installations and recommendations for development of generic compliance guidance. Final report

    International Nuclear Information System (INIS)

    1982-01-01

    This final report identifies and describes federal and state environmental requirements applicable to selected Department of Energy (DOE) nuclear field installations, establishes priorities for the requirements, determines the need for development of additional compliance guidance, and recommends development of compliance guidance for specific priority requirements. Compliance guidance developed as part of the study is summarized. The applicability of environmental requirements to 12 DOE field installations was reviewed. Five installations were examined under Task 4. They are: Nevada Test Site; Lawrence Berkeley Laboratory; Paducah Gaseous Diffusion Plant; Oak Ridge Y-12 Plant; and Los Alamos Scientific Laboratory. Seven other installations were reviewed under Task 2 and included: Idaho National Engineering Laboratory; Hanford; Savannah River Plant; Oak Ridge Gaseous Diffusion Plant; Pantex Plant; Rocky Flats Plant; and Lawrence Livermore Laboratory. This report combines results of the two tasks. The objective of the study was to identify the set of environmental requirements which are applicable to DOE field installations, track changes in the requirements, and prepare compliance guidance for important requirements and important regulatory developments as necessary. A cumulative calendar update for July 1982 represents the current status of applicable requirements. Environmental profiles of each facility, along with ambient monitoring results, are presented. Applicable federal requirements are identified. The specific applicability of federal and state requirements is detailed for each installation. Compliance guidance available from various agencies is described. Each requirement described is ranked by priority, and recommendations are made for development of additional guidance

  16. Proposal for Land Consolidation Project Solutions for Selected Problem Areas

    Science.gov (United States)

    Wojcik-Len, Justyna; Strek, Zanna

    2017-12-01

    One of the economic tools for supporting agricultural policy are the activities implemented under the Rural Development Program (RDP). By encouraging agricultural activities and creating equal opportunities for development of farms, among others in areas with unfavourable environmental conditions characterized by low productivity of soils exposed to degradation, decision makers can contribute to improving the spatial structure of rural areas. In Poland, one of the major concerns are agricultural problem areas (regions). In view of this situation, the aim of this article was to characterize the problem areas in question and propose land consolidation project solutions for selected fragments of those areas. This paper presents the results of a review of literature and an analysis of geodetic and cartographic data regarding the problem areas. The process of land consolidation, which is one of the technical and legal instruments supporting the development of rural areas, was characterized. The study allowed the present authors to establish criteria for selecting agricultural problem areas for land consolidation. To develop a proposal for rational management of the problem areas, key general criteria (location, topography, soil quality and usefulness) and specific criteria were defined and assigned weights. A conception of alternative development of the agricultural problem areas was created as part of a land consolidation project. The results were used to create a methodology for the development of agricultural problem areas to be employed during land consolidation in rural areas. Every agricultural space includes areas with unfavourable environmental and soil conditions determined by natural or anthropogenic factors. Development of agricultural problem areas through land consolidation should take into account the specific functions assigned to these areas in land use plans, as well as to comply with legal regulations.

  17. National inventory of selected biological monitoring programs. Summary report of current or recently completed projects, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kemp, H. T.

    1976-10-01

    The Inventory has resulted in establishment of a series of data bases containing biological monitoring information of varying types, namely, directory of investigators, record of projects received from mail questionnaire, detailed description of selected biomonitoring projects, and bibliographic citations supporting the projects received. This report contains detailed descriptions of selected biomonitoring projects organized on a state-by-state basis and with appropriate indices.

  18. Characteristics of Criteria for Selecting Investment Projects under Uncertainty

    Directory of Open Access Journals (Sweden)

    Adrian ENCIU

    2011-07-01

    Full Text Available Within financial theory and practice, there are used five main criteria for selecting investment projects: the net present value (NPV criterion, the internal rate of return (IRR criterion, the return term (RT criterion, the profitability ratio (PR criterion and the supplementary return (SR criterion. The assay will emphasize several new properties of said indexes for investment assessment, having as starting point the hypotheses of (approximately normal repartition of cash-flows generated by an investment project. The obtained results point to the fact that the NPV indexes (the analysis of this criterion was carried out in the article “The NPV Criterion for Valuing Investments under Uncertainty”, Daniel Armeanu, Leonard Lache, Economic Computation and Economic Cybernetics Studies and Research no. 4/2009, pp. 133-143, IRR, PR, RT and SR register normal repartitions, therefore simplifying the investment analysis under economic uncertainty, by the capacity of building confidence intervals and assessing probabilities for the inferior limits of said investment assessment indexes.

  19. SNF project's MCO compliance assessment with DOE ''general design criteria,'' order 6430.1A and ''SNF project MCO additional NRC requirements,'' HNF-SD-SNF-DB-005

    International Nuclear Information System (INIS)

    GOLDMANN, L.H.

    1999-01-01

    This document is presented to demonstrate the MCOs compliance to the major design criteria invoked on the MCO. This document is broken down into a section for the MCO's evaluation against DOE Order 6430.1A General Design Criteria sixteen divisions and then the evaluation of the MCO against HNF-SD-SNF-DB-005 ''Spent Nuclear Fuel Project Multi-Canister Overpack Additional NRC Requirements.'' The compliance assessment is presented as a matrix in tabular form. The MCO is the primary container for the K-basin's spent nuclear fuel as it leaves the basin pools and through to the 40 year interim storage at the Canister Storage Building (CSB). The MCO and its components interface with; the K basins, shipping cask and transportation system, Cold Vacuum Drying facility individual process bays and equipment, and CSB facility including the MCO handling machine (MHM), the storage tubes, and the MCO work stations where sampling, welding, and inspection of the MCO is performed. As the MCO is the primary boundary for handling, process, and storage, its main goals are to minimize the spread of its radiological contents to the outside of the MCO and provide for nuclear criticality control. The MCO contains personnel radiation shielding only on its upper end, in the form of a shield plug, where the process interfaces are located. Shielding beyond the shield plug is the responsibility of the using facilities. The design of the MCO and its components is depicted in drawings H-2-828040 through H-2-828075. Not every drawing number in the sequence is used. The first drawing number, H-2-828040, is the drawing index for the MCO. The design performance specification for the MCO is HW-S-0426, and was reviewed and approved by the interfacing design authorities, the safety, regulatory, and operations groups, and the local DOE office. The current revision for the design performance specification is revision 5. The designs of the MCO have been reviewed and approved in a similar way and the reports

  20. Projects management in organization on the selected example

    OpenAIRE

    A. Kania; M. Spilka; S. Griner

    2013-01-01

    Purpose: In this paper stages of project management taking into consideration many useful tools and methods were presented. The quality management in the project, the risk estimation, costs of the project realization and many others were discussed. The analysis of project management of an element using in an automotive industry was carried out.Design/methodology/approach: In this article classification of the projects was presented. The stages of project management and relations among them we...

  1. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    Energy Technology Data Exchange (ETDEWEB)

    Raff, D. [U.S. Dept. of the Interior, Bureau of Reclamation, Denver, Colorado (United States)

    2008-07-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  2. Projected large flood event sensitivity to projection selection and temporal downscaling methodology

    International Nuclear Information System (INIS)

    Raff, D.

    2008-01-01

    Large flood events, that influence regulatory guidelines as well as safety of dams decisions, are likely to be affected by climate change. This talk will evaluate the use of climate projections downscaled and run through a rainfall - runoff model and its influence on large flood events. The climate spatial downscaling is performed statistically and a re-sampling and scaling methodology is used to temporally downscale from monthly to daily signals. The signals are run through a National Weather Service operational rainfall-runoff model to produce 6-hour flows. The flows will be evaluated for changes in large events at look-ahead horizons from 2011 - 2040, 2041 - 2070, and 2071 - 2099. The sensitivity of results will be evaluated with respect to projection selection criteria and re-sampling and scaling criteria for the Boise River in Idaho near Lucky Peak Dam. (author)

  3. ERM 593 Applied Project_Guidance for Reviewing and Approving a Waste Stream Profile in the Waste Compliance and Tracking System_Final_05-05-15

    Energy Technology Data Exchange (ETDEWEB)

    Elicio, Andy U. [Los Alamos National Lab. (LANL), Los Alamos, NM (United States)

    2015-05-05

    My ERM 593 applied project will provide guidance for the Los Alamos National Laboratory Waste Stream Profile reviewer (i.e. RCRA reviewer) in regards to Reviewing and Approving a Waste Stream Profile in the Waste Compliance and Tracking System. The Waste Compliance and Tracking system is called WCATS. WCATS is a web-based application that “supports the generation, characterization, processing and shipment of LANL radioactive, hazardous, and industrial waste.” The LANL generator must characterize their waste via electronically by filling out a waste stream profile (WSP) in WCATS. Once this process is completed, the designated waste management coordinator (WMC) will perform a review of the waste stream profile to ensure the generator has completed their waste stream characterization in accordance with applicable state, federal and LANL directives particularly P930-1, “LANL Waste Acceptance Criteria,” and the “Waste Compliance and Tracking System User's Manual, MAN-5004, R2,” as applicable. My guidance/applied project will describe the purpose, scope, acronyms, definitions, responsibilities, assumptions and guidance for the WSP reviewer as it pertains to each panel and subpanel of a waste stream profile.

  4. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  5. Computational Experiment Study on Selection Mechanism of Project Delivery Method Based on Complex Factors

    Directory of Open Access Journals (Sweden)

    Xiang Ding

    2014-01-01

    Full Text Available Project delivery planning is a key stage used by the project owner (or project investor for organizing design, construction, and other operations in a construction project. The main task in this stage is to select an appropriate project delivery method. In order to analyze different factors affecting the PDM selection, this paper establishes a multiagent model mainly to show how project complexity, governance strength, and market environment affect the project owner’s decision on PDM. Experiment results show that project owner usually choose Design-Build method when the project is very complex within a certain range. Besides, this paper points out that Design-Build method will be the prior choice when the potential contractors develop quickly. This paper provides the owners with methods and suggestions in terms of showing how the factors affect PDM selection, and it may improve the project performance.

  6. Estimation of volatility of selected oil production projects

    International Nuclear Information System (INIS)

    Costa Lima, Gabriel A.; Suslick, Saul B.

    2006-01-01

    In oil project valuation and investment decision-making, volatility is a key parameter, but it is difficult to estimate. From a traditional investment viewpoint, volatility reduces project value because it increases its discount rate via a higher risk premium. Contrarily, according to the real-option pricing theory, volatility may aggregate value to the project, since the downside potential is limited whereas the upside is theoretically unbounded. However, the estimation of project volatility is very complicated since there is not a historical series of project values. In such cases, many analysts assume that oil price volatility is equal to that of project. In order to overcome such problems, in this paper an alternative numerical method based on present value of future cash flows and Monte Carlo simulation is proposed to estimate the volatility of projects. This method is applied to estimate the volatility of 12 deep-water offshore oil projects considering that oil price will evolve according to one of two stochastic processes: Geometric Brownian Motion and Mean-Reverting Motion. Results indicate that the volatility of commodity usually undervalue that of project. For the set of offshore projects analyzed in this paper, project volatility is at least 79% higher than that of oil prices and increases dramatically in those cases of high capital expenditures and low price. (author)

  7. Decisive management in selecting locations for development of construction projects

    Science.gov (United States)

    Szafranko, E.; Pawłowicz, J. A.

    2017-08-01

    The location of an investment project is one of the most important decisions in the construction and land development business. The shape of a new building and aspects of its future use depend on making a good choice of a land plot where it will be constructed. There are many characteristics involved descriptions of land available for development. On the one hand, different buildings (with different envisaged use) fit differently to a given location. Residential homes, for example, require a location which will ensure a peaceful lifestyle, with places for walks and recreation, situated in a relatively quite setting. On the other hand, close proximity to schools, shops or a health clinic is another important consideration. Industrial buildings should be localized so as not to be a nuisance to others, and their location should facilitate efficient transport of raw materials and ready products. Yet other requirements are defined for public buildings. It is therefore evident that the characteristics included in an evaluation of the location of a planned building can be highly diverse and their diversity makes the evaluation difficult. Selection of a location can be supported by a variety of methods. For instance, an evaluation can rely on assigning points which indicate the fulfillment of certain criteria. This approach generates a complex evaluation in the form of tables and maps of usefulness. Another possibility is to make an assessment of the criteria that a given land parcels should satisfy in order to develop a specific type of a building. Having combined these two sets of information, we can create a system or a model for the management of land resources, which will easily help to support decision making processes pertaining to the choice of a location. This article shows a model approach for a specific building.

  8. Criminal Compliance

    Directory of Open Access Journals (Sweden)

    Cristina Antonella Andretta

    2015-10-01

    The article discusses the concepts of both compliance and criminal compliance, its main components and structure as well as the main rules relating to its global application, and finally his emergence in the Ecuadorian legal system.

  9. ISSUES REGARDING THE FINANCIAL FLOW PROJECTIONS IN THE SELECTION OF INVESTMENT PROJECTS

    Directory of Open Access Journals (Sweden)

    Mariana Rodica ŢÎRLEA

    2015-06-01

    Full Text Available For a company, through investment activities, it is followed to either create new abilities or expand the existing abilities, the partial or complete replacement of existing technical base or its modernization. In the condition that it is desired the creation of a technical base, the investment involves the purchase of fixed capital that can materialize in: buildings, special buildings, land, vehicles, facilities, equipment, etc. In terms of expansion and modernization, investment implies the existence of a material base on which should be intervened wholly or partly by its development or modernization. For the selection of investment projects in the context of investment strategy established at enterprise level through a Financial justification and prioritization of investments this should lead to the achievement of the objectives set at its level.

  10. Selecting Map Projections in Minimizing Area Distortions in GIS Applications

    Directory of Open Access Journals (Sweden)

    Ahmet Kaya

    2008-12-01

    Full Text Available Varioussoftware for Geographical Information Systems (GISs have been developed and used in many different engineering projects. In GIS applications, map coverage is important in terms of performing reliable and meaningful queries. Map projections can be conformal, equal-area and equidistant. The goal of an application plays an important role in choosing one of those projections. Choosing the equal-area projection for an application in which area information is used (forestry, agriculture, ecosystem etc reduces the amount of distortion on the area, but many users using GIS ignore this fact and continue to use applications with present map sheets no matter in what map projection it is. For example, extracting area information from data whose country system’s map sheet is in conformal projection is relatively more distorted, compared to an equal-area projection one. The goal of this study is to make the best decision in choosing the most proper equal-area projection among the choices provided by ArcGIS 9.0, which is a popular GIS software package, and making a comparison on area errors when conformal projection is used. In this study, the area of parcels chosen in three different regions and geographic coordinates and whose sizes vary between 0.01 to 1,000,000 ha are calculated according to Transversal Mercator (TM, 3°, Universal Transversal Mercator (UTM, 6° and 14 different equal-area projections existing in the ArcGIS 9.0 GIS software package. The parcel areas calculated with geographical coordinates are accepted as definite. The difference between the sizes calculated according to projection coordinates and real sizes of the parcels are determined. Consequently, the appropriate projections are decided for the areas smaller and equal than 1,000 ha and greater than 1,000 ha in the GIS software package.

  11. Environmental Compliance Guide

    International Nuclear Information System (INIS)

    1981-02-01

    The Guide is intended to assist Department of Energy personnel by providing information on the NEPA process, the processes of other environmental statutes that bear on the NEPA process, the timing relationships between the NEPA process and these other processes, as well as timing relationships between the NEPA process and the development process for policies, programs, and projects. This information should be helpful not only in formulating environmental compliance plans but also in achieving compliance with NEPA and various other environmental statutes. The Guide is divided into three parts with related appendices: Part I provides guidance for developing environmental compliance plans for DOE actions; Part II is devoted to NEPA with detailed flowcharts depicting the compliance procedures required by CEQ regulations and Department of Energy NEPA Guidelines; and Part III contains a series of flowcharts for other Federal environmental requirements that may apply to DOE projects

  12. Environmental Compliance Guide

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-02-01

    The Guide is intended to assist Department of Energy personnel by providing information on the NEPA process, the processes of other environmental statutes that bear on the NEPA process, the timing relationships between the NEPA process and these other processes, as well as timing relationships between the NEPA process and the development process for policies, programs, and projects. This information should be helpful not only in formulating environmental compliance plans but also in achieving compliance with NEPA and various other environmental statutes. The Guide is divided into three parts with related appendices: Part I provides guidance for developing environmental compliance plans for DOE actions; Part II is devoted to NEPA with detailed flowcharts depicting the compliance procedures required by CEQ regulations and Department of Energy NEPA Guidelines; and Part III contains a series of flowcharts for other Federal environmental requirements that may apply to DOE projects.

  13. Medium - Scale Projects Selection Using Multi-Objective Decision ...

    African Journals Online (AJOL)

    Sixty (60) questionnaires were administered to experienced technically oriented personnel in the study area for evaluating objective weights attached to various projects. Forty-five responded and their values of objective weights attached to project cost, environmental effects, reliability, implementability and sustainable ...

  14. Environmental projects. Volume 5, part 1: Study of subsurface contamination. Part 2: Guide to implement environmental compliance programs

    Science.gov (United States)

    Bengelsdorf, I.

    1988-01-01

    In support of the national goal for the preservation of the environment and the protection of human health and safety, NASA, the Jet Propulsion Laboratory, and the Goldstone Deep Space Communications Complex have adopted the position that their operating installations shall maintain a high level of compliance in regard to regulations concerning environmental hazards. An investigation carried out by Engineering Science, Inc. focused on possible underground contamination that may have resulted from leaks and/or spills from storage facilities at the Goldstone Communications Complex. It also involved the cleanup of a non-hazardous waste dumpsite at the Mojave Base Site at the Goldstone complex. The report also includes details of the management duties and responsibilities needed to maintain compliance with environmental laws and regulations.

  15. Capping the Cost of Compliance with the Kyoto Protocol and Recycling Revenues into Land-Use Projects

    Directory of Open Access Journals (Sweden)

    Bernhard Schlamadinger

    2001-01-01

    Full Text Available There is the concern among some countries that compliance costs with commitments under the Kyoto Protocol may be unacceptably high. There is also the concern that technical difficulties with the inclusion of land use, land-use change, and forestry activities in non-Annex I countries might lead to an effective exclusion of such activities from consideration under the Protocol. This paper is proposing a mechanism that addresses both these concerns. In essence, it is suggested that parties should be able to purchase fixed-price offset certificates if they feel they cannot achieve compliance through other means alone, such as by improved energy efficiency, increased use of renewable energy, or use of the flexible mechanisms in the Kyoto Protocol. These offset certificates would act as a price cap for the cost of compliance for any party to the Protocol. Revenues from purchase of the offset certificates would be directed to forest-based activities in non-Annex I countries such as forest protection that may carry multiple benefits including enhancing net carbon sequestration.

  16. Capping the cost of compliance with the Kyoto Protocol and recycling revenues into land-use projects.

    Science.gov (United States)

    Schlamadinger, B; Obersteiner, M; Michaelowa, A; Grubb, M; Azar, C; Yamagata, Y; Goldberg, D; Read, P; Kirschbaum, M U; Fearnside, P M; Sugiyama, T; Rametsteiner, E; Böswald, K

    2001-07-14

    There is the concern among some countries that compliance costs with commitments under the Kyoto Protocol may be unacceptably high. There is also the concern that technical difficulties with the inclusion of land use, land-use change, and forestry activities in non-Annex I countries might lead to an effective exclusion of such activities from consideration under the Protocol. This paper is proposing a mechanism that addresses both these concerns. In essence, it is suggested that parties should be able to purchase fixed-price offset certificates if they feel they cannot achieve compliance through other means alone, such as by improved energy efficiency, increased use of renewable energy, or use of the flexible mechanisms in the Kyoto Protocol. These offset certificates would act as a price cap for the cost of compliance for any party to the Protocol. Revenues from purchase of the offset certificates would be directed to forest-based activities in non-Annex I countries such as forest protection that may carry multiple benefits including enhancing net carbon sequestration.

  17. METHOD FOR SELECTION OF PROJECT MANAGEMENT APPROACH BASED ON FUZZY CONCEPTS

    Directory of Open Access Journals (Sweden)

    Igor V. KONONENKO

    2017-03-01

    Full Text Available Literature analysis of works that devoted to research of the selection a project management approach and development of effective methods for this problem solution is given. Mathematical model and method for selection of project management approach with fuzzy concepts of applicability of existing approaches are proposed. The selection is made of such approaches as the PMBOK Guide, the ISO21500 standard, the PRINCE2 methodology, the SWEBOK Guide, agile methodologies Scrum, XP, and Kanban. The number of project parameters which have a great impact on the result of the selection and measure of their impact is determined. Project parameters relate to information about the project, team, communication, critical project risks. They include the number of people involved in the project, the customer's experience with this project team, the project team's experience in this field, the project team's understanding of requirements, adapting ability, initiative, and others. The suggested method is considered on the example of its application for selection a project management approach to software development project.

  18. A project-based geoscience curriculum: select examples

    Science.gov (United States)

    Brown, L. M.; Kelso, P. R.; White, R. J.; Rexroad, C. B.

    2007-12-01

    Principles of constructivist educational philosophy serve as a foundation for the recently completed National Science Foundation sponsored undergraduate curricular revision undertaken by the Geology Department of Lake Superior State University. We integrate lecture and laboratory sessions utilizing active learning strategies that focus on real-world geoscience experiences and problems. In this presentation, we discuss details of three research-like projects that require students to access original data, process and model the data using appropriate geological software, interpret and defend results, and disseminate results in reports, posters, and class presentations. The projects are from three upper division courses, Carbonate Systems, Sequence Stratigraphy, and Geophysical Systems, where teams of two to four students are presented with defined problems of durations ranging from a few weeks to an entire semester. Project goals and location, some background information, and specified dates and expectations for interim and final written and oral reports are provided to students. Some projects require the entire class to work on one data set, some require each team to be initially responsible for a portion of the project with teams ultimately merging data for interpretation and to arrive at final conclusions. Some projects require students to utilize data from appropriate geological web sites such as state geological surveys. Others require students to design surveys and utilize appropriate instruments of their choice for field data collection. Students learn usage and applications of appropriate geological software in compiling, processing, modeling, and interpreting data and preparing formal reports and presentations. Students uniformly report heightened interest and motivation when engaged in these projects. Our new curriculum has resulted in an increase in students" quantitative and interpretive skills along with dramatic improvement in communication and

  19. Nuclear Power Plant project site selection geotechnical considerations

    International Nuclear Information System (INIS)

    Katti, V.J.; Banerjee, D.C.

    1997-01-01

    During the selection of a site for Nuclear Power Plant (NPP) and Radioactive Waste Plant (RWP), geotechnical investigations play a significant role in deciding merits and demerits of the sites. Any accidents in these units can play havoc on mankind and may leave bitter imprints on generations to come. Hence proper care has to be taken at the early stage for selecting the sites. Site selection procedure is a complicated one, because it involves experts from various disciplines like geology, geophysics, civil, mechanical electrical engineering, health-physics and other fields

  20. A Framework for Six Sigma Project Selection in Higher Educational Institutions, Using a Weighted Scorecard Approach

    Science.gov (United States)

    Holmes, Monica C.; Jenicke, Lawrence O.; Hempel, Jessica L.

    2015-01-01

    Purpose: This paper discusses the importance of the Six Sigma selection process, describes a Six Sigma project in a higher educational institution and presents a weighted scorecard approach for project selection. Design/Methodology/Approach: A case study of the Six Sigma approach being used to improve student support at a university computer help…

  1. Transparent national strategies for long-term decarbonization in compliance with the 2 deg. C goal: The Deep Decarbonization Pathways Project

    International Nuclear Information System (INIS)

    Colombier, Michel; Waisman, Henri

    2015-01-01

    Fifteen countries among the biggest emitters of greenhouse gases are involved in the Deep Decarbonization Pathways Project (DDPP), which is based on 'country teams' of climate experts. This international project seeks to draw the pathways for a transition toward national decarbonization in compliance with the goal of limiting global warming to 2 deg. C maximum by 2050. These pathways should serve to: a) foresee the economic, technical and behavioral 'ruptures' to be addressed in order to facilitate the transition; b) identify specifically national factors in pathways toward decarbonization; and c) analyze the effects over time of this transition and the sequencing of the measures that might cause them. A preliminary report was released in September 2014, and the final report is scheduled for mid-2015. In support of an international agreement during the Paris Climate Conference, it will focus on the implications of deep decarbonization and the conditions for achieving it

  2. A Methodology for Collective Evaluation and Selection of Industrial R&D Projects

    OpenAIRE

    Muhittin Oral; Ossama Kettani; Pascal Lang

    1991-01-01

    This paper proposes a methodology for evaluating and selecting R&D projects in a collective decision setting, especially useful at sectorial and national levels. It consists of two major phases: Evaluation and Selection. The evaluation process repeatedly uses mathematical programming models to determine the "relative values" of a given R&D project from the viewpoint of the other R&D projects. The selection process of R&D projects is based on these "relative values" and is done through a model...

  3. Optimal fringe angle selection for digital fringe projection technique.

    Science.gov (United States)

    Wang, Yajun; Zhang, Song

    2013-10-10

    Existing digital fringe projection (DFP) systems mainly use either horizontal or vertical fringe patterns for three-dimensional shape measurement. This paper reveals that these two fringe directions are usually not optimal where the phase change is the largest to a given depth variation. We propose a novel and efficient method to determine the optimal fringe angle by projecting a set of horizontal and vertical fringe patterns onto a step-height object and by further analyzing two resultant phase maps. Experiments demonstrate the existence of the optimal angle and the success of the proposed optimal angle determination method.

  4. A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem

    Directory of Open Access Journals (Sweden)

    Yongyi Shou

    2014-01-01

    Full Text Available A multiagent evolutionary algorithm is proposed to solve the resource-constrained project portfolio selection and scheduling problem. The proposed algorithm has a dual level structure. In the upper level a set of agents make decisions to select appropriate project portfolios. Each agent selects its project portfolio independently. The neighborhood competition operator and self-learning operator are designed to improve the agent’s energy, that is, the portfolio profit. In the lower level the selected projects are scheduled simultaneously and completion times are computed to estimate the expected portfolio profit. A priority rule-based heuristic is used by each agent to solve the multiproject scheduling problem. A set of instances were generated systematically from the widely used Patterson set. Computational experiments confirmed that the proposed evolutionary algorithm is effective for the resource-constrained project portfolio selection and scheduling problem.

  5. SELECTION OF EFFECTIVE MODELS OF PROJECT IMPLEMENTATION IN A CHANGING FINANCIAL SITUATION

    Directory of Open Access Journals (Sweden)

    Александр Иванович МЕНЕЙЛЮК

    2015-06-01

    Full Text Available The article describes the methods of selecting effective models of construction projects of residential buildings and recommendations for its use. The technique is based on the construction of the models in the program Microsoft Project and analysis using the program COMPEX. Methods can be used not only for building projects. It is especially effective in a variable financial situation.

  6. Knowledge, opinions and compliance related to the 100% smoke-free law in hospitality venues in Kampala, Uganda: cross-sectional results from the KOMPLY Project.

    Science.gov (United States)

    Gravely, Shannon; Nyamurungi, Kellen Namusisi; Kabwama, Steven Ndugwa; Okello, Gabriel; Robertson, Lindsay; Heng, Kelvin Khow Chuan; Ndikum, Achiri Elvis; Oginni, Adeniyi Samuel; Rusatira, Jean Christophe; Kakoulides, Socrates; Huffman, Mark D; Yusuf, Salim; Bianco, Eduardo

    2018-01-05

    This study evaluated knowledge, opinions and compliance related to Uganda's comprehensive smoke-free law among hospitality venues in Kampala Uganda. This multi-method study presents cross-sectional findings of the extent of compliance in the early phase of Uganda's comprehensive smoke-free law (2 months postimplementation; pre-enforcement). Bars, pubs and restaurants in Kampala Uganda. A two-stage stratified cluster sampling procedure was used to select hospitality sites stratified by all five divisions in Kampala. A total of 222 establishments were selected for the study. One hospitality representative from each of the visited sites agreed to take part in a face-to-face administered questionnaire. A subsample of hospitality venues were randomly selected for tobacco air quality testing (n=108). Data were collected between June and August 2016. Knowledge and opinions of the smoke-free law among hospitality venue staff and owners. The level of compliance with the smoke-free law in hospitality venues through: (1) systematic objective observations (eg, active smoking, the presence of designated smoking areas, 'no smoking' signage) and (2) air quality by measuring the levels of tobacco particulate matter (PM 2.5 ) in both indoor and outdoor venues. Active smoking was observed in 18% of venues, 31% had visible 'no smoking' signage and 47% had visible cigarette remains. Among interviewed respondents, 57% agreed that they had not been adequately informed about the smoke-free law; however, 90% were supportive of the ban. Nearly all respondents (97%) agreed that the law will protect workers' health, but 32% believed that the law would cause financial losses at their establishment. Indoor PM 2.5 levels were hazardous (267.6 µg/m 3 ) in venues that allowed smoking and moderate (29.6 µg/m 3 ) in smoke-free establishments. In the early phase of Uganda's smoke-free law, the level of compliance in hospitality venues settings in Kampala was suboptimal. Civil society and the

  7. Selection and Specification of Rear-Projection Screens.

    Science.gov (United States)

    Vlahos, Petro

    1961-01-01

    The characteristics of the rear-projection screen are examined in detail. Numerical constants are provided that define these characteristics for practical screens and convert foot-candles to footlamberts. A procedure is given by which an optimum screen may be specified for a specific application. Contents include--(1) introduction, (2) projection…

  8. 7 CFR 3570.67 - Project selection priorities.

    Science.gov (United States)

    2010-01-01

    ... points; or (4) Between 20,001 and 50,000, inclusive, when applicable—5 points. (b) Income priorities. The median household income of the population to be served by the proposed project is below the higher of the poverty line or: (1) 60 percent of the State nonmetropolitan median household income—30 points; (2) 70...

  9. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    Science.gov (United States)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation

  10. Compliance status

    International Nuclear Information System (INIS)

    Black, D.G.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the activities conducted to ensure that the Hanford Site is in compliance with federal environmental protection statutes and related Washington State and local environmental protection regulations and the status of Hanford's compliance with these requirements. Environmental permits required under the environmental protection regulations are discussed under the applicable statute

  11. Compliance status

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.G.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the activities conducted to ensure that the Hanford Site is in compliance with federal environmental protection statutes and related Washington State and local environmental protection regulations and the status of Hanford`s compliance with these requirements. Environmental permits required under the environmental protection regulations are discussed under the applicable statute.

  12. Performing compliance

    DEFF Research Database (Denmark)

    Wimmelmann, Camilla Lawaetz

    2017-01-01

    the local policy workers front-staged some practices in the implementation process and back-staged others. The local policy workers deliberately performed ‘guideline compliance’ by using information control and impression management techniques. The findings suggest that local guideline compliance should...... be regarded as a staged performance in which deliberate techniques are used to produce and manage certain impressions of compliance....

  13. Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project

    Science.gov (United States)

    Yang, Yuanyue; Li, Huimin

    2017-12-01

    In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.

  14. Ready to Retrofit: The Process of Project Team Selection, Building Benchmarking, and Financing Commercial Building Energy Retrofit Projects

    Energy Technology Data Exchange (ETDEWEB)

    Sanders, Mark D. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Parrish, Kristen [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Mathew, Paul [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-01

    This guide presents a process for three key activities for the building owner in preparing to retrofit existing commercial buildings: selecting project teams, benchmarking the existing building, and financing the retrofit work. Although there are other essential steps in the retrofit process, the three activities presented in this guide are the critical elements where the building owner has the greatest influence on the outcome of the project.

  15. Selecting the right collaborative components in a construction project

    DEFF Research Database (Denmark)

    Bohnstedt, Kristian Ditlev; Wandahl, Søren

    2018-01-01

    Regardless of context and scope, collaboration is consistently attributed to be an essential determinant of success in construction projects. Researches have long been concerned with the issue of poor collaboration, but situational determination of collaborative components has been overlooked....... The questionnaire was distributed electronically to 440 respondents; after sorting a total of 288 valid responses were obtained. The result is a set of components in a model of structures of collaboration that facilitates a more efficient and effective situational collaboration (EESC), it is denoted as target areas...... structured in type of contract, party and component....

  16. So many developers, so many projects: toward a motivation-based theory of project selection

    NARCIS (Netherlands)

    van Osch, W.; Adelaar, T.; Pith, M.

    2011-01-01

    Studies into open source software (OSS) development projects have hitherto focused on the question of why people aremotivated to contribute to these projects, thereby assuming that motivational factors are the same across all types of OSSprojects. In this study we challenge this assumption by

  17. Alcolocks : factors influencing implementation, participation and compliance : literature review contributed to the EU project Alcolock Implementation in the European Union.

    NARCIS (Netherlands)

    Mathijssen, M.P.M.

    2007-01-01

    In 2004-2005, a series of alcolock field trials were conducted in four European countries, in the framework of the EU research project Alcolock Implementation in the European Union. This project was granted by the European Commission, Directorate-General for Energy and Transport (DG-TREN). As part

  18. Parallel Scaling Characteristics of Selected NERSC User ProjectCodes

    Energy Technology Data Exchange (ETDEWEB)

    Skinner, David; Verdier, Francesca; Anand, Harsh; Carter,Jonathan; Durst, Mark; Gerber, Richard

    2005-03-05

    This report documents parallel scaling characteristics of NERSC user project codes between Fiscal Year 2003 and the first half of Fiscal Year 2004 (Oct 2002-March 2004). The codes analyzed cover 60% of all the CPU hours delivered during that time frame on seaborg, a 6080 CPU IBM SP and the largest parallel computer at NERSC. The scale in terms of concurrency and problem size of the workload is analyzed. Drawing on batch queue logs, performance data and feedback from researchers we detail the motivations, benefits, and challenges of implementing highly parallel scientific codes on current NERSC High Performance Computing systems. An evaluation and outlook of the NERSC workload for Allocation Year 2005 is presented.

  19. Procurement selection criteria for projects in the public sector: evidence from Nigeria

    Directory of Open Access Journals (Sweden)

    Richard Ajayi Jimoh

    2016-12-01

    Full Text Available The selection of suitable procurement practice for construction projects is a very complex and demanding tasks for stakeholders in the construction industry. In spite of the overabundance of techniques and tools accessible to the stakeholders in selecting an appropriate procurement method, clients are faced with the decision as to which of the selection criteria can be adopted for a given construction project to achieve project goals and objectives. This paper focused on evaluating the existing procurement methods being practised in the Nigerian construction industry with a view to identifying and establishing the parameters for selection that will improve contract delivery systems. In this research, quantitative approach was used to collect data from 420 contractors, consultants and clients based in the Federal Capital Territory, Abuja where large numbers of building projects are being procured. The findings revealed six most commonly considered criteria and deduced that, the quality, cost and duration of the project determines the type of procurement method to adopt. It is therefore stated that in selecting any particular procurement method for building construction projects, the complexity of such project should be clearly defined and the other performance indicators be given adequate consideration for a successful project delivery that will enhance the achievement of the client’s goal.

  20. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  1. An analysis of project selection and assignment criteria of Danish tenders in Europe

    Directory of Open Access Journals (Sweden)

    Jasper Kranker Larsen

    2013-12-01

    Full Text Available Public construction agencies are one of the largest developers within the Danish construction industry, where such agencies own and develop new public construction projects. Most of these projects are put out in European tender. This study analyses the selection and assignment criteria employed by these agencies in different types of public sector projects. Some of the objectives pursued by the study include the determination of 1/ the selection and assignment criteria mostly used in Danish public tenders 2/ how different types of projects use selection and assignment criteria in the bidding process, and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period: January 2010 to March 2013. Fisher's Exact Test was conducted to determine if there was any significant use of some selection and assignment criteria. The findings of the study showed that invited tenders with pre-qualification and lowest price in 69.8% of the tenders are the most used selection and assignment criteria, with little regard to project type.

  2. Year 2000 Compliance of Selected Mission Critical Command, Control, and Communications Systems Managed by The Defense Information Systems Agency

    National Research Council Canada - National Science Library

    1999-01-01

    ...) has adequately planned for and managed year 2000 conversion risks to avoid undue disruption to selected mission critical command, control, and communications systems used in support of Unified...

  3. Strategic project selection based on evidential reasoning approach for high-end equipment manufacturing industry

    Directory of Open Access Journals (Sweden)

    Lu Guangyan

    2017-01-01

    Full Text Available With the rapid development of science and technology, emerging information technologies have significantly changed the daily life of people. In such context, strategic project selection for high-end equipment manufacturing industries faces more and more complexities and uncertainties with the consideration of several complex criteria. For example, a group of experts rather than a single expert should be invited to select strategic project for high-end equipment manufacturing industries and the experts may feel difficulty to express their preferences towards different strategic projects due to their limited cognitive capabilities. In order to handle these complexities and uncertainties, the criteria framework of strategic project selection is firstly constructed based on the characteristics of high-end equipment manufacturing industries and then evidential reasoning (ER approach is introduced in this paper to help experts express their uncertain preferences and aggregate these preferences to generate an appropriate strategic project. A real case of strategic project selection in a high-speed train manufacturing enterprise is investigated to demonstrate the validity of the ER approach in solving strategic project selection problem.

  4. 76 FR 15961 - Funding Priorities and Selection Criterion; Disability and Rehabilitation Research Projects and...

    Science.gov (United States)

    2011-03-22

    ... priorities and a selection criterion for the Disability and Rehabilitation Research Projects and Centers... outcomes for underserved populations; (4) identify research gaps; (5) identify mechanisms of integrating research and practice; and (6) disseminate findings. This notice proposes two priorities and a selection...

  5. PROJECT W-551 INTERIM PRETREATMENT SYSTEM TECHNOLOGY SELECTION SUMMARY DECISION REPORT AND RECOMMENDATION

    International Nuclear Information System (INIS)

    CONRAD EA

    2008-01-01

    This report provides the conclusions of the tank farm interim pretreatment technology decision process. It documents the methodology, data, and results of the selection of cross-flow filtration and ion exchange technologies for implementation in project W-551, Interim Pretreatment System. This selection resulted from the evaluation of specific scope criteria using quantitative and qualitative analyses, group workshops, and technical expert personnel

  6. An analysis of project selection and assignment criteria of danish tenders in europe

    DEFF Research Database (Denmark)

    Larsen, Jesper Kranker; Ussing, Lene Faber; Brunø, Thomas Ditlev

    2013-01-01

    , and 3/ any significant difference between the use of selection and assignment criteria in Danish public construction projects. The study uses a quantitative research approach where 157 Danish public tender cases were selected from the European Tenders Electronic Daily database between the period...

  7. Business and Industry Project-Based Capstone Courses: Selecting Projects and Assessing Learning Outcomes

    Science.gov (United States)

    Maleki, Reza A.

    2009-01-01

    This is the first of two articles in which the author shares experiences gained from the development and delivery of a business/industry project-based capstone course. The course integrates research, proposal development and design experience based on knowledge and skills acquired in earlier coursework. The course also incorporates standards and…

  8. Selection of executors for realization of individual tasks of the project

    Directory of Open Access Journals (Sweden)

    Asanov Askhat

    2017-01-01

    Full Text Available This article deals with the task of selection of executors for the realization of individual tasks of a new project. A short review of approaches to the estimation of personnel based on intellectual methods is provided. Two approaches to the task solution of executors’ selection are reviewed. The first approach allows considering estimation of competence of potential executors and data about projects that have already been realized. These data and requirements to the tasks of new projects are presented with the help of cognitive map with correspondent vertices. In the article, a methodologic example of the suggested approach use is introduced. The second approach suggests the use of Hopfield’s neural network. Neural networks allow using the already available experience of project activities during realization of new projects.

  9. New Method of Selecting Efficient Project Portfolios in the Presence of Hybrid Uncertainty

    Directory of Open Access Journals (Sweden)

    Bogdan Rębiasz

    2016-01-01

    Full Text Available A new methods of selecting efficient project portfolios in the presence of hybrid uncertainty has been presented. Pareto optimal solutions have been defined by an algorithm for generating project portfolios. The method presented allows us to select efficient project portfolios taking into account statistical and economic dependencies between projects when some of the parameters used in the calculation of effectiveness can be expressed in the form of an interactive possibility distribution and some in the form of a probability distribution. The procedure for processing such hybrid data combines stochastic simulation with nonlinear programming. The interaction between data are modeled by correlation matrices and the interval regression. Economic dependences are taken into account by the equations balancing the production capacity of the company. The practical example presented indicates that an interaction between projects has a significant impact on the results of calculations. (original abstract

  10. How patient-selected colors for removable appliances are reflected in electronically tracked compliance (wear times and wear behavior).

    Science.gov (United States)

    Schott, Timm C; Menne, Dieter

    2018-03-27

    A broad spectrum of colors for removable appliances, intended to optimize acceptance of treatment and patient cooperation, have been available on the dental market for years. This is the first study to analyze how patient-selected colors are reflected in wear times and wear behavior of removable appliances. The study included 117 children (55 girls and 62 boys) who were treated with active removable plate or functional appliances. All patients were offered to choose from 11 different colors, which were pooled into six groups (black, blue, green, yellow, pink, red) for analysis, or to combine any two to four colors ("multicolored" group) for their appliances. All appliances featured a built-in microsensor (TheraMon; MC Technology, Hargelsberg, Austria) for objective wear-time tracking. Differences between wear times were analyzed using pairwise t tests and Tukey correction. The longest median wear times were recorded in the blue and green groups (≈11 h/d) and the shortest ones in the red and pink groups (≈9 h/d), but they were not significantly influenced by the patient-selected colors. The median wear times involved an age-related decrease by 0.56 h/y that was statistically significant ( P = .00005). No gender-specific patterns of wear behavior were observed. Patient-selected colors for removable appliances can presumably improve acceptance of treatment, but they are not associated with statistically significant improvements in wear time or wear behavior.

  11. SELECTING WORKING TEAMS FOR INFORMATION TECHNOLOGY OUTSOURCING PROJECTS THROUGH A COMBINATION OF METHODOLOGIES

    Directory of Open Access Journals (Sweden)

    María Alejandra Castellini

    Full Text Available ABSTRACT This paper deals with a problem that Information Technology outsourcing suppliers generally face when selecting a working team technically capable for specific roles in software development projects. A combination of methodologies, interactively integrated, is proposed. They are Soft System Methodology to structure the problem, Repertory Grid for individual interviews and elicitation of the selection criteria, DRV Processes to assess the candidates and to generate knowledge and consensus on the selection process and Linear Programming to assign people to each position. This multimethodology allowed finding a more comprehensive solution than that initially requested by the company, since it helped to establish the necessary transformations for the selection model to operate in the right way, set the competencies to be considered as selection criteria, develop a consensus estimate of the weighted criteria, and award global values to candidates, optimizing the assignment of roles in the group for the project.

  12. A Study on Site Selecting for National Project including High Level Radioactive Waste Disposal

    Energy Technology Data Exchange (ETDEWEB)

    Kim, Kilyoo [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2016-10-15

    Many national projects are stopped since sites for the projects are not determined. The sites selections are hold by NIMBY for unpleasant facilities or by PYMFY for preferable facilities among local governments. The followings are the typical ones; NIMBY projects: high level radioactive waste disposal, THAAD, Nuclear power plant(NPP), etc. PIMFY projects: South-east new airport, KTX station, Research center for NPP decommission, etc. The site selection for high level radioactive waste disposal is more difficult problem, and thus government did not decide and postpone to a dead end street. Since it seems that there is no solution for site selection for high level radioactive waste disposal due to NIMBY among local governments, a solution method is proposed in this paper. To decide a high level radioactive waste disposal, the first step is to invite a bid by suggesting a package deal including PIMFY projects such as Research Center for NPP decommission. Maybe potential host local governments are asked to submit sealed bids indicating the minimum compensation sum that they would accept the high level radioactive waste disposal site. If there are more than one local government put in a bid, then decide an adequate site by considering both the accumulated PESS point and technical evaluation results. By considering how fairly preferable national projects and unpleasant national projects are distributed among local government, sites selection for NIMBY or PIMFY facilities is suggested. For NIMBY national projects, risk, cost benefit analysis is useful and required since it generates cost value to be used in the PESS. For many cases, the suggested method may be not adequate. However, similar one should be prepared, and be basis to decide sites for NIMBY or PIMFY national projects.

  13. Project Selection and Transparency Factors in Housing Public-Private Partnerships in Nigeria

    Directory of Open Access Journals (Sweden)

    Eziyi Offia Ibem

    2018-06-01

    Full Text Available The application of Public-Private Partners (PPPs in housing provisioning is on the increase across the world. However, there is a paucity of empirical studies on the specific factors considered at the initiation, and measures taken to ensure transparency at the procurement stages, of PPP housing projects. This study examined project selection factors and transparency measures in PPP housing projects using data sourced from oral interviews with 27 experts in nine PPP housing schemes in Nigeria. Results of the content analysis revealed that the top two selection factors considered by both the public and private sector operators of PPP housing projects in Nigeria are the availability of land and viability of the funding arrangements. Whereas the public-sector partners also consider the availability of competent private sector to deliver the projects, the private developers are concerned with the location of proposed projects. It was also found that the two key measures taken to ensure transparency at the procurement stage of the projects are transparent and competitive bidding and open advertisements of tender opportunities. These imply that before embarking on PPP housing projects, operators should ensure that there is available land in good locations, sound funding arrangements, and measures for achieving transparency in the schemes.

  14. Project evaluation and selection using fuzzy Delphi method and zero - one goal programming

    Science.gov (United States)

    Alias, Suriana; Adna, Nofarziah; Arsad, Roslah; Soid, Siti Khuzaimah; Ali, Zaileha Md

    2014-12-01

    Project evaluation and selection is a factor affecting the impotence of board director in which is trying to maximize all the possible goals. Assessment of the problem occurred in organization plan is the first phase for decision making process. The company needs a group of expert to evaluate the problems. The Fuzzy Delphi Method (FDM) is a systematic procedure to evoke the group's opinion in order to get the best result to evaluate the project performance. This paper proposes an evaluation and selection of the best alternative project based on combination of FDM and Zero - One Goal Programming (ZOGP) formulation. ZOGP is used to solve the multi-criteria decision making for final decision part by using optimization software LINDO 6.1. An empirical example on an ongoing decision making project in Johor, Malaysia is implemented for case study.

  15. Bibliography of the SAIL Panama Canal Zone Project 2008 : a selected bibliography.

    OpenAIRE

    DeHart, Liz

    2009-01-01

    During the 18th Annual 2008 SAIL meeting at the Smithsonian Tropical Research Institute in Panama, Vielka Chang-Yau, librarian, mentioned the need to digitize and make available through the Aquatic Commons some of the early documents related to the U.S. biological survey of Panama from 1910 to 1912. With the assistance of SAIL, a regional marine librarian’s group, a digital project developed and this select bibliography represents the sources used for the project. It will assist research...

  16. A process for selection and training of super-users for ERP implementation projects

    DEFF Research Database (Denmark)

    Danielsen, Peter; Sandfeld Hansen, Kenneth; Helt, Mads

    2017-01-01

    The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super-users in......The concept of super-users as a means to facilitate ERP implementation projects has recently taken a foothold in practice, but is still largely overlooked in research. In particular, little is known about the selection and training processes required to successfully develop skilled super...

  17. Project of neural network for steel grade selection with the assumed CCT diagram

    OpenAIRE

    S. Malara; L.A. Dobrzański; J. Trzaska

    2008-01-01

    Purpose: The aim of this paper was developing a project of neural network for selection of steel grade with the specified CCT diagram – structure and of harness after heat treatment.Design/methodology/approach: The goal has been achieved in the following stages: at the first stage characteristic points of CCT diagram have been determined. At the second stage neural network has been developed and optimized.Findings: The neural network was developed in this paper, that allowed selection of stee...

  18. A proposed selection process in Over-The-Top project portfolio management

    Directory of Open Access Journals (Sweden)

    Jemy Vestius Confido

    2018-05-01

    Full Text Available Purpose: The purpose of this paper is to propose an Over-The-Top (OTT initiative selection process for communication service providers (CSPs entering an OTT business. Design/methodology/approach: To achieve this objective, a literature review was conducted to comprehend the past and current practices of the project (or initiative selection process as mainly suggested in project portfolio management (PPM. This literature was compared with specific situations and the needs of CSPs when constructing an OTT portfolio. Based on the contrast between the conventional project selection process and specific OTT characteristics, a different selection process is developed and tested using group model-building (GMB, which involved an in-depth interview, a questionnaire and a focus group discussion (FGD. Findings: The paper recommends five distinct steps for CSPs to construct an OTT initiative portfolio: candidate list of OTT initiatives, interdependency diagram, evaluation of all interdependent OTT initiatives, evaluation of all non-interdependent OTT initiatives and optimal portfolio of OTT initiatives. Research limitations/implications: The research is empirical, and various OTT services are implemented; the conclusion is derived only from one CSP, which operates as a group. Generalization of this approach will require further empirical tests on different CSPs, OTT players or any firms performing portfolio selection with a degree of interdependency among the projects. Practical implications: Having considered interdependency, the proposed OTT initiative selection steps can be further implemented by portfolio managers for more effective OTT initiative portfolio construction. Originality/value: While the previous literature and common practices suggest ensuring the benefits (mainly financial of individual projects, this research accords higher priority to the success of the overall OTT initiative portfolio and recommends that an evaluation of the overall

  19. Compliance with Private Food Safety Standards among ...

    International Development Research Centre (IDRC) Digital Library (Canada)

    ... and the livelihood impact of compliance. In addition, the project aims to build the capacity of farmers and other locally based actors to enhance compliance and thereby contribute to increased welfare in the project area. Expected outputs include one PhD thesis, five master's theses, and various journal publications and ...

  20. Cornell University remote sensing program. [selected research projects in land and water resource management

    Science.gov (United States)

    Liang, T.; Belcher, D. J.; Mcnair, A. J.

    1974-01-01

    The major activities of the program staff from December 1, 1973 to May 31, 1974 are reported and include: (1) communication and instruction; (2) data and facilities; (3) research completed; (4) research in progress; (5) selected correspondence; (6) grant sponsored travel; and (7) seminars and newsletters. Detailed information and maps are given for the following selected projects: (1) ERTS mapping of waterways in the Tug Hill region of New York State; (2) photo-archeological investigation of Great Gully, New York; and (3) evaluation of selected highway impacts using aerial photography.

  1. Environmental Management Department Quality Assurance Project Plan for Radionuclide Emission Measurements Project for compliance with National Emission Standards for Hazardous Air Pollutants (NESHAP)

    Energy Technology Data Exchange (ETDEWEB)

    Poole, D A

    1992-06-01

    This Quality Assurance Project Plan (QAPP) satisfies the quality assurance (QA) requirements in 40 CFR Part 61, Method 114, for ensuring that the radionuclide air emission measurements from the Y-12 Plant are representative; of a known precision and accuracy; and include administrative controls to ensure prompt response when emission measurements indicate an increase over normal radionuclide emissions. The QAPP ensures the quality of the Y-12 Plant radionuclide emission measurements data from the continuous samplers, breakthrough monitors, and minor radionuclide release points. The plan specifies the procedures for the management of the activities affecting the quality of the data for the Y-12 Plant Environmental Management Department (EMD) within the Health, Safety, Environment, and Accountability Division (HSEA).

  2. Environmental Management Department Quality Assurance Project Plan for Radionuclide Emission Measurements Project for compliance with National Emission Standards for Hazardous Air Pollutants (NESHAP)

    International Nuclear Information System (INIS)

    Poole, D.A.

    1992-06-01

    This Quality Assurance Project Plan (QAPP) satisfies the quality assurance (QA) requirements in 40 CFR Part 61, Method 114, for ensuring that the radionuclide air emission measurements from the Y-12 Plant are representative; of a known precision and accuracy; and include administrative controls to ensure prompt response when emission measurements indicate an increase over normal radionuclide emissions. The QAPP ensures the quality of the Y-12 Plant radionuclide emission measurements data from the continuous samplers, breakthrough monitors, and minor radionuclide release points. The plan specifies the procedures for the management of the activities affecting the quality of the data for the Y-12 Plant Environmental Management Department (EMD) within the Health, Safety, Environment, and Accountability Division (HSEA)

  3. Feature Subset Selection and Instance Filtering for Cross-project Defect Prediction - Classification and Ranking

    Directory of Open Access Journals (Sweden)

    Faimison Porto

    2016-12-01

    Full Text Available The defect prediction models can be a good tool on organizing the project's test resources. The models can be constructed with two main goals: 1 to classify the software parts - defective or not; or 2 to rank the most defective parts in a decreasing order. However, not all companies maintain an appropriate set of historical defect data. In this case, a company can build an appropriate dataset from known external projects - called Cross-project Defect Prediction (CPDP. The CPDP models, however, present low prediction performances due to the heterogeneity of data. Recently, Instance Filtering methods were proposed in order to reduce this heterogeneity by selecting the most similar instances from the training dataset. Originally, the similarity is calculated based on all the available dataset features (or independent variables. We propose that using only the most relevant features on the similarity calculation can result in more accurate filtered datasets and better prediction performances. In this study we extend our previous work. We analyse both prediction goals - Classification and Ranking. We present an empirical evaluation of 41 different methods by associating Instance Filtering methods with Feature Selection methods. We used 36 versions of 11 open source projects on experiments. The results show similar evidences for both prediction goals. First, the defect prediction performance of CPDP models can be improved by associating Feature Selection and Instance Filtering. Second, no evaluated method presented general better performances. Indeed, the most appropriate method can vary according to the characteristics of the project being predicted.

  4. Women, Islam, and Pakistan: A Selected Annotated Bibliography. Fulbright-Hays Summer Seminar Abroad Project.

    Science.gov (United States)

    Phillips, Brenda

    This bibliography features selected books, book chapters, research projects, and journal articles, published between 1953 and 1994, about the social, legal, economic, educational political, and professional position of Muslim Pakistani women. Sixteen of the references are annotated. An additional 41 bibliographic references to other materials, not…

  5. Hybrid Multicriteria Group Decision Making Method for Information System Project Selection Based on Intuitionistic Fuzzy Theory

    Directory of Open Access Journals (Sweden)

    Jian Guo

    2013-01-01

    Full Text Available Information system (IS project selection is of critical importance to every organization in dynamic competing environment. The aim of this paper is to develop a hybrid multicriteria group decision making approach based on intuitionistic fuzzy theory for IS project selection. The decision makers’ assessment information can be expressed in the form of real numbers, interval-valued numbers, linguistic variables, and intuitionistic fuzzy numbers (IFNs. All these evaluation pieces of information can be transformed to the form of IFNs. Intuitionistic fuzzy weighted averaging (IFWA operator is utilized to aggregate individual opinions of decision makers into a group opinion. Intuitionistic fuzzy entropy is used to obtain the entropy weights of the criteria. TOPSIS method combined with intuitionistic fuzzy set is proposed to select appropriate IS project in group decision making environment. Finally, a numerical example for information system projects selection is given to illustrate application of hybrid multi-criteria group decision making (MCGDM method based on intuitionistic fuzzy theory and TOPSIS method.

  6. 50 CFR 86.61 - What process does the Service use to select projects for grants?

    Science.gov (United States)

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What process does the Service use to....61 What process does the Service use to select projects for grants? The Service's Division of Federal... SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION...

  7. Benchmarking of nuclear reactors selected in the frame of GIF project

    International Nuclear Information System (INIS)

    Azpitarte, O; Villanueva, A; Ramos, R; Ramilo, L; Alvarez, M; Yorio, D; Herrero, V

    2012-01-01

    In this article a comparative assessment of the six reactor concepts selected in the frame of the Generation IV International Forum (GIF) project is presented. The assessment was carried out in the areas of Viability of the concept, Design and nuclear safety, Economics, Sustainability, Proliferation resistance, Nuclear fuel, Reprocessing, Materials and Balance of Plant, by means of qualification of chosen performance indicators (author)

  8. Identification and selection of cases and controls in the Pneumonia Etiology Research for Child Health project

    NARCIS (Netherlands)

    Deloria-Knoll, Maria; Feikin, Daniel R.; Scott, J. Anthony G.; O'Brien, Katherine L.; DeLuca, Andrea N.; Driscoll, Amanda J.; Levine, Orin S.; Black, Robert E.; Bhutta, Zulfiqar A.; Campbell, Harry; Cherian, Thomas; Crook, Derrick W.; de Jong, Menno D.; Dowell, Scott F.; Graham, Stephen M.; Klugman, Keith P.; Lanata, Claudio F.; Madhi, Shabir A.; Martin, Paul; Nataro, James P.; Piazza, Franco M.; Qazi, Shamim A.; Zar, Heather J.; Baggett, Henry C.; Brooks, W. Abdullah; Chipeta, James; Ebruke, Bernard; Endtz, Hubert P.; Groome, Michelle; Hammitt, Laura L.; Howie, Stephen R. C.; Kotloff, Karen; Maloney, Susan A.; Moore, David; Otieno, Juliet; Seidenberg, Phil; Tapia, Milagritos; Thamthitiwat, Somsak; Thea, Donald M.; Zaman, Khaleque

    2012-01-01

    Methods for the identification and selection of patients (cases) with severe or very severe pneumonia and controls for the Pneumonia Etiology Research for Child Health (PERCH) project were needed. Issues considered include eligibility criteria and sampling strategies, whether to enroll hospital or

  9. An ANP-based approach for the selection of photovoltaic solar power plant investment projects

    International Nuclear Information System (INIS)

    Aragones-Beltran, P.; Pastor-Ferrando, J.P.; Rodriguez-Pozo, F.; Chaparro-Gonzalez, F.

    2010-01-01

    In this paper the Analytic Network Process (ANP) is applied to the selection of photovoltaic (PV) solar power projects. These projects follow a long management and execution process from plant site selection to plant start-up. As a consequence, there are many risks of time delays and even of project stoppage. In the case study presented in this paper a top manager of an important Spanish company that operates in the power market has to decide on the best PV project (from four alternative projects) to invest based on risk minimization. The manager identified 50 project execution delay and/or stoppage risks. The influences between the elements of the network (groups of risks and alternatives) were identified and analyzed using the ANP multicriteria decision analysis method. Two different ANP models were used: one hierarchy model (that considers AHP as a particular case of ANP) and one network-based model. The results obtained in each model were compared and analyzed. The main conclusion is that unlike the other models used in the study, the single network model can manage all the information of the real-world problem and thus it is the decision analysis model recommended by the authors. The strengths and weaknesses of ANP as a multicriteria decision analysis tool are also described in the paper. (author)

  10. DECISION SUPPORT CONCEPT TO MANAGEMENT OF CONSTRUCTION PROJECTS - PROBLEM OF CONSTRUCTION SITE SELECTION

    Directory of Open Access Journals (Sweden)

    Nikša Jajac

    2013-02-01

    Full Text Available The aim of this paper is to present Decision Support Concept (DSC for management of construction projects. Focus of our research is in application of multicritera methods (MCM to decision making in planning phase of construction projects (related to the problem of construction sites selection. The problem is identified as a significant one from many different aspects such as economic aspect, civil engineering aspect, etc. what indicates the necessity for evaluation of multiple sites by several different criteria. Therefore, DSC for construction site selection based on PROMETHEE method is designed. In order to define the appropriate criteria, their weights and preference functions for the concept, three groups of stakeholders are involved (investors, construction experts and experts for real estate market in its design. AHP method has been used for determination of criteria weights. The model has been tested on the problem of site selection for construction of residential-commercial building in four largest cities in Croatia.

  11. Selection of Investment Projects by Monte Carlo Method in Risk Condition

    Directory of Open Access Journals (Sweden)

    M. E.

    2017-12-01

    Full Text Available The Monte Carlo method (also known as the Monte Carlo simulation was proposed by Nicholas Metropolis, S. Ulam and Jhon Von Neiman in 50-th years of the past century. The method can be widely applied to analysis of investment projects due to the advantages recognized both by practitioners and the academic community. The balance model of a project with discounted financial flows has been implemented for Microsoft Excel and Google Docs spread-sheet solutions. The Monte Carlo method for project with low and high correlated net present value (NPV parameters in the environment of the electronic tables of MS Excel/Google Docs. A distinct graduation of risk was identified. A necessity of account of correlation effects and the use of multivariate imitation during the project selection has been demonstrated.

  12. Methods Dealing with Complexity in Selecting Joint Venture Contractors for Large-Scale Infrastructure Projects

    Directory of Open Access Journals (Sweden)

    Ru Liang

    2018-01-01

    Full Text Available The magnitude of business dynamics has increased rapidly due to increased complexity, uncertainty, and risk of large-scale infrastructure projects. This fact made it increasingly tough to “go alone” into a contractor. As a consequence, joint venture contractors with diverse strengths and weaknesses cooperatively bid for bidding. Understanding project complexity and making decision on the optimal joint venture contractor is challenging. This paper is to study how to select joint venture contractors for undertaking large-scale infrastructure projects based on a multiattribute mathematical model. Two different methods are developed to solve the problem. One is based on ideal points and the other one is based on balanced ideal advantages. Both of the two methods consider individual difference in expert judgment and contractor attributes. A case study of Hong Kong-Zhuhai-Macao-Bridge (HZMB project in China is used to demonstrate how to apply these two methods and their advantages.

  13. Preliminary selection criteria for the Yucca Mountain Project waste package container material

    International Nuclear Information System (INIS)

    Halsey, W.G.

    1991-01-01

    The Department of Energy's Yucca Mountain Project (YMP) is evaluating a site at Yucca Mountain in Nevada for construction of a geologic repository for the storage of high-level nuclear waste. Lawrence Livermore National Laboratory's (LLNL) Nuclear Waste Management Project (NWMP) has the responsibility for design, testing, and performance analysis of the waste packages. The design is performed in an iterative manner in three sequential phases (conceptual design, advanced conceptual design, and license application design). An important input to the start of the advanced conceptual design is the selection of the material for the waste containers. The container material is referred to as the 'metal barrier' portion of the waste package, and is the responsibility of the Metal Barrier Selection and Testing task at LLNL. The selection will consist of several steps. First, preliminary, material-independent selection criteria will be established based on the performance goals for the container. Second, a variety of engineering materials will be evaluated against these criteria in a screening process to identify candidate materials. Third, information will be obtained on the performance of the candidate materials, and final selection criteria and quantitative weighting factors will be established based on the waste package design requirements. Finally, the candidate materials will be ranked against these criteria to determine whether they meet the mandated performance requirements, and to provide a comparative score to choose the material for advanced conceptual design activities. This document sets forth the preliminary container material selection criteria to be used in screening candidate materials. 5 refs

  14. Management Model for Evaluation and Selection of Engineering Equipment Suppliers for Construction Projects in Iraq

    Directory of Open Access Journals (Sweden)

    Kadhim Raheem Erzaij

    2016-06-01

    Full Text Available Engineering equipment is essential part in the construction project and usually manufactured with long lead times, large costs and special engineering requirements. Construction manager targets that equipment to be delivered in the site need date with the right quantity, appropriate cost and required quality, and this entails an efficient supplier can satisfy these targets. Selection of engineering equipment supplier is a crucial managerial process .it requires evaluation of multiple suppliers according to multiple criteria. This process is usually performed manually and based on just limited evaluation criteria, so better alternatives may be neglected. Three stages of survey comprised number of public and private companies in Iraqi construction sector were employed to identify main criteria and sub criteria for supplier selection and their priorities.The main criteria identified were quality of product, commercial aspect, delivery, reputation and position, and system quality . An effective technique in multiple criteria decision making (MCDM as analytical hierarchy process (AHP have been used to get importance weights of criteria based on experts judgment. Thereafter, a management software system for Evaluation and Selection of Engineering Equipment Suppliers (ESEES has been developed based on the results obtained from AHP. This model was validated in a case study at municipality of Baghdad involved actual cases of selection pumps suppliers for infrastructure projects .According to experts, this model can improve the current process followed in the supplier selection and aid decision makers to adopt better choices in the domain of selection engineering equipment suppliers.

  15. A MCDM approach for project finance selection: An application in the renewable energy sector

    Directory of Open Access Journals (Sweden)

    García-Bernabeu, Ana

    2015-05-01

    Full Text Available Renewable energy (RE is emerging as a solution in order to replace fossil fuels and become the primary source of energy consumption. Investments in the RE sector involve huge amounts of capital but also many risks. Public sector plays an important role in promoting RE projects but due to the need for reducing public expenditure the private sector becomes essential in financing this type of projects. Project Finance is widely used in RE projects and is especially attractive to the private sector because it can fund major projects off balance sheet. The objective of this paper is to present a decision making tool for helping the private sector on the selection process of RE projects to be funded. The problem could be considered as a multiple criteria decision-making problem where both, financial and non-financial criteria have to be taken into account. Objective aggregation weights for those criteria are obtained using the Moderate Pessimism Decision Making approach and a final ranking of the projects is obtained.

  16. On quantifying uncertainty for project selection: the case of renewable energy sources' investment

    International Nuclear Information System (INIS)

    Kirytopoulos, Konstantinos; Rentizelas, Athanassios; Tziralis, Georgios

    2006-01-01

    The selection of a project among different alternatives, considering the limited resources of a company (organisation), is an added value process that determines the prosperity of an undertaken project (investment). This applies also to the 'boming' Renewable Energy Sector, especially under the circumstances established by the recent activation of the Kyoto protocal and by the plethora of available choices for renewable energy sources (RES) projjects. The need for a reliable project selection method among the various alternatives is, therefore, highlighted and, in this context, the paper proposes the NPV function as one of possible criteria for the selection of a RES project. Furthermore, it differentiates from the typical NPV calculation process by adding the concept of a probabilistic NPV approach through Monte Carlo simulation. Reality is non-deterministic, so any attempt of modelling it by using a deterministic approach is by definition erroneous. The paper ultimately proposes a process of substituting the point with a range estimation, capable of quantifying the various uncertainty factors and in this way elucidate the accomplishment possibilities of eligible scenarious. The paper is enhanced by case study showing how the proposed method can be practically applied to support the investment decision, thus enabling the decision makers to judge its effectiveness and usefulness.(Author)

  17. Adopt-A-MACT Project: A Manual of Model Documents and Guidance to Aid Compliance and Enforcement of the Nutritional Yeast MACT (Maximum Achievable Control Technology)

    Science.gov (United States)

    This manual provides a compliance checklist, and overview of emissions limitations, how to do performance tests, and an overview of applicability of general provisions for the Nutritional Yeast NESHAP.

  18. Knowledge, opinions and compliance related to the 100% smoke-free law in hospitality venues in Kampala, Uganda: cross-sectional results from the KOMPLY Project

    OpenAIRE

    Gravely, Shannon; Nyamurungi, Kellen Namusisi; Kabwama, Steven Ndugwa; Okello, Gabriel; Robertson, Lindsay; Heng, Kelvin Khow Chuan; Ndikum, Achiri Elvis; Oginni, Adeniyi Samuel; Rusatira, Jean Christophe; Kakoulides, Socrates; Huffman, Mark D; Yusuf, Salim; Bianco, Eduardo

    2018-01-01

    Objective This study evaluated knowledge, opinions and compliance related to Uganda’s comprehensive smoke-free law among hospitality venues in Kampala Uganda. Design This multi-method study presents cross-sectional findings of the extent of compliance in the early phase of Uganda’s comprehensive smoke-free law (2 months postimplementation; pre-enforcement). Setting Bars, pubs and restaurants in Kampala Uganda. Procedure and participants A two-stage stratified cluster sampling procedure was us...

  19. A quality improvement project to improve the Medicare and Medicaid Services (CMS) sepsis bundle compliance rate in a large healthcare system.

    Science.gov (United States)

    Raschke, Robert A; Groves, Robert H; Khurana, Hargobind S; Nikhanj, Nidhi; Utter, Ethel; Hartling, Didi; Stoffer, Brenda; Nunn, Kristina; Tryon, Shona; Bruner, Michelle; Calleja, Maria; Curry, Steven C

    2017-01-01

    Sepsis is a leading cause of mortality and morbidity in hospitalised patients. The Centers for Medicare and Medicaid Services (CMS) mandated that US hospitals report sepsis bundle compliance rate as a quality process measure in October 2015. The specific aim of our study was to improve the CMS sepsis bundle compliance rate from 30% to 40% across 20 acute care hospitals in our healthcare system within 1 year. The study included all adult inpatients with sepsis sampled according to CMS specifications from October 2015 to September 2016. The CMS sepsis bundle compliance rate was tracked monthly using statistical process control charting. A baseline rate of 28.5% with 99% control limits was established. We implemented multiple interventions including computerised decision support systems (CDSSs) to increase compliance with the most commonly missing bundle elements. Compliance reached 42% (99% statistical process control limits 18.4%-38.6%) as CDSS was implemented system-wide, but this improvement was not sustained after CMS changed specifications of the outcome measure. Difficulties encountered elucidate shortcomings of our study methodology and of the CMS sepsis bundle compliance rate as a quality process measure.

  20. Selected Examples of LDRD Projects Supporting Test Ban Treaty Verification and Nonproliferation

    Energy Technology Data Exchange (ETDEWEB)

    Jackson, K. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Al-Ayat, R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States); Walter, W. R. [Lawrence Livermore National Lab. (LLNL), Livermore, CA (United States)

    2015-02-23

    The Laboratory Directed Research and Development (LDRD) Program at the DOE National Laboratories was established to ensure the scientific and technical vitality of these institutions and to enhance the their ability to respond to evolving missions and anticipate national needs. LDRD allows the Laboratory directors to invest a percentage of their total annual budget in cutting-edge research and development projects within their mission areas. We highlight a selected set of LDRD-funded projects, in chronological order, that have helped provide capabilities, people and infrastructure that contributed greatly to our ability to respond to technical challenges in support of test ban treaty verification and nonproliferation.

  1. Selecting the Most Economic Project under Uncertainty Using Bootstrap Technique and Fuzzy Simulation

    Directory of Open Access Journals (Sweden)

    Kamran Shahanaghi

    2012-01-01

    Full Text Available This article, by leaving pre-determined membership function of a fuzzy set which is a basic assumption for such subject, will try to propose a hybrid technique to select the most economic project among alternative projects in fuzziness interest rates condition. In this way, net present worth (NPW would be the economic indicator. This article tries to challenge the assumption of large sample sizes availability for membership function determination and shows that some other techniques may have less accuracy. To give a robust solution, bootstrapping and fuzzy simulation is suggested and a numerical example is given and analyzed.

  2. Effect of an educational intervention in primary care physicians on the compliance of indicators of good clinical practice in the treatment of type 2 diabetes mellitus [OBTEDIGA project].

    Science.gov (United States)

    Vidal-Pardo, J I; Pérez-Castro, T R; López-Álvarez, X L; Santiago-Pérez, M I; García-Soidán, F J; Muñiz, J

    2013-08-01

    To evaluate the effect of an educational intervention among primary care physicians on several indicators of good clinical practice in diabetes care. Two groups of physicians were randomly assigned to the intervention or control group (IG and CG). Every physician randomly selected two samples of patients from all type 2 diabetic patients aged 40 years and above and diagnosed more than a year ago. Baseline and final information were collected cross-sectionally 12 months apart, in two independent samples of 30 patients per physician. The educational intervention comprised: distribution of educational materials and physicians' specific bench-marking information, an on-line course and three on-site educational workshops on diabetes. External observers collected information directly from the physicians and from the medical records of the patients on personal and family history of disease and on the evolution and treatment of their disease. Baseline information was collected retrospectively in the control group. Intervention group comprised 53 physicians who included a total of 3018 patients in the baseline and final evaluations. CG comprised 50 physicians who included 2868 patients in the same evaluations. Measurement of micro-albuminuria in the last 12 months (OR = 1.6, 95% CI: 1.1-2.4) and foot examination in the last year (OR = 2.0, 95% CI: 1.1-3.6) were the indicators for which greater improvement was found in the IG. No other indicator considered showed statistically significant improvement between groups. The identification of indicators with very low level of compliance and the implementation of a simple intervention in physicians to correct them is effective in improving the quality of care of diabetic patients. © 2013 John Wiley & Sons Ltd.

  3. Network Insights for Partner Selection in Inter-Organisational New Product Development Projects

    DEFF Research Database (Denmark)

    Ruiz, Pedro Parraguez; Maier, Anja

    2016-01-01

    Selecting partners for new product development (NPD) is an important yet under-supported task. Thispaper focuses on decision-making support for the NPD collaboration stages of partner exploration andsearch. We provide a conceptual framework for a network-based platform to identify potential......: technologicalcloseness, relational closeness, geographical closeness and a set of organisational variables. In order toidentify a subset of new product development partners and aid the selection process, three characteristicsof NPD projects are considered as mediators of those success factors: the desired degree...... and illustrate with examples the networkbasedplatform to explore NPD partners. The developed framework and platform are part of Net-Sights,an ongoing research project to develop open-source decision-support tools for network insights. Thefirst version of this tool will soon be available as an online platform...

  4. Research and Development Project Selection Methods at the Air Force Wright Aeronautical Laboratories.

    Science.gov (United States)

    1985-09-01

    personal and telephone interviews. Ten individuals from each of the four AFWAL Laboratories were interrviewed. The results illustrated that few of the...680). Aaker and Tyebee. 1978. The authors constructed a model that dealt with the selection of interdependent R&D projects. The model covers three...of this research effort. Scope * The data collection method used in this study consisted of a combination of personal and telephone interviews. The

  5. Evaluation and selection of decision-making methods to assess landfill mining projects.

    Science.gov (United States)

    Hermann, Robert; Baumgartner, Rupert J; Vorbach, Stefan; Ragossnig, Arne; Pomberger, Roland

    2015-09-01

    For the first time in Austria, fundamental technological and economic studies on recovering secondary raw materials from large landfills have been carried out, based on the 'LAMIS - Landfill Mining Austria' pilot project. A main focus of the research - and the subject of this article - was to develop an assessment or decision-making procedure that allows landfill owners to thoroughly examine the feasibility of a landfill mining project in advance. Currently there are no standard procedures that would sufficiently cover all the multiple-criteria requirements. The basic structure of the multiple attribute decision making process was used to narrow down on selection, conceptual design and assessment of suitable procedures. Along with a breakdown into preliminary and main assessment, the entire foundation required was created, such as definitions of requirements to an assessment method, selection and accurate description of the various assessment criteria and classification of the target system for the present 'landfill mining' vs. 'retaining the landfill in after-care' decision-making problem. Based on these studies, cost-utility analysis and the analytical-hierarchy process were selected from the range of multiple attribute decision-making procedures and examined in detail. Overall, both methods have their pros and cons with regard to their use for assessing landfill mining projects. Merging these methods or connecting them with single-criteria decision-making methods (like the net present value method) may turn out to be reasonable and constitute an appropriate assessment method. © The Author(s) 2015.

  6. Generation IV and transmutation materials (GETMAT) project: First assessment of selected results

    International Nuclear Information System (INIS)

    Fazio, Concetta; Serrano, Marta; Gessi, Alessandro; Henry, Jean; Malerba, Lorenzo

    2015-01-01

    The Generation IV and Transmutation Material (GETMAT) project has been initiated within the 7. EURATOM framework programme with the objective to support the development of innovative reactor designs. Emphasis has been put on the investigation, both in the theoretical and experimental domains, of selected material properties that are cross-cutting among the various Generation IV and Transmutation systems. The selection of the properties to be investigated has been performed by identifying relevant conditions of key components as cores and primary systems. Moreover, taking into account the envisaged conditions of these components it turned out that innovative materials might be a better choice with respect to conventional nuclear grade steels. Therefore, ODS alloys and 9-12 Cr Ferritic/Martensitic (F/M) steels have been selected as reference for the GETMAT project. The R and D activities have been focused on basic characterisation of ODS alloys produced ad hoc for the project and on an extensive PIE programme of F/M steels irradiated in previous programmes. Finally, first principle modelling studies to explain irradiation hardening and embrittlement of F/M alloys were an additional important task. The objective of this manuscript is to make a first assessment of the results obtained within GETMAT. (authors)

  7. Adaptive Equalizer Using Selective Partial Update Algorithm and Selective Regressor Affine Projection Algorithm over Shallow Water Acoustic Channels

    Directory of Open Access Journals (Sweden)

    Masoumeh Soflaei

    2014-01-01

    Full Text Available One of the most important problems of reliable communications in shallow water channels is intersymbol interference (ISI which is due to scattering from surface and reflecting from bottom. Using adaptive equalizers in receiver is one of the best suggested ways for overcoming this problem. In this paper, we apply the family of selective regressor affine projection algorithms (SR-APA and the family of selective partial update APA (SPU-APA which have low computational complexity that is one of the important factors that influences adaptive equalizer performance. We apply experimental data from Strait of Hormuz for examining the efficiency of the proposed methods over shallow water channel. We observe that the values of the steady-state mean square error (MSE of SR-APA and SPU-APA decrease by 5.8 (dB and 5.5 (dB, respectively, in comparison with least mean square (LMS algorithm. Also the families of SPU-APA and SR-APA have better convergence speed than LMS type algorithm.

  8. Selection of priority investment projects for the development of the Russian Arctic

    Science.gov (United States)

    Novoselov, A.; Potravny, I.; Novoselova, I.; Gassiy, V.

    2017-12-01

    In the Russian Arctic, there is currently an active process of preparation and implementation of investment projects aiming to extract natural resources, with the aim of sustainable socioeconomic development of the region. These projects are associated with the development of key zones in the Arctic and involve the exploration for and production of minerals (diamonds, gold, rare-earth metals, oil, and gas) and the development of energy and infrastructure (e.g., the Northern Sea Route). Such projects, which are often carried out in territories of traditional nature management belonging to the indigenous peoples of the North, must consider their environmental and social responsibility and the preservation of the ethnic identity and culture of indigenous peoples. The extraction of mineral deposits in the Arctic and the Far North places new demands on subsoil users, related to the preservation and development of the socio-cultural environment of the indigenous peoples of the North and to the ecological rehabilitation of the area. This article presents economic and mathematical models for selecting the optimal development project options based on the pairwise comparison of investment projects and the evaluation of indigenous peoples' preferences. We investigated the investment projects' impact on traditional territories in the Arctic, including the Republic of Sakha (Yakutia), in terms of socioeconomic and ethnological development, and environmental change. The suggested system of models can be used to assess the priority of projects supporting and developing the region in the mining corporation's area of responsibility. The proposed models are based on fuzzy set theory, which provides an effective assessment of the population's preferences for projects. Data are processed using the hierarchy analysis method and multivariate optimization calculations to determine the project sets at different funding levels. The creation of information-linked processing models is

  9. Identification of multi-criteria for supplier selection in IT project outsourcing

    Science.gov (United States)

    Fusiripong, Prashaya; Baharom, Fauziah; Yusof, Yuhanis

    2017-10-01

    In the increasing global business competitiveness, most organizations have attempted to determine the suitable external parties to support their core and non-core competency, particularly, in IT project outsourcing. The IT supplier selection is required to apply multi-criteria which comprised tangible criteria and intangible criteria in consider optimal IT supplier. Most researches attempted to identify optimal criteria for selecting IT supplier, however, the criteria cannot be the considered common criteria support the variety of IT outsourcing. Therefore, the study aimed to identify a common set of criteria being used in the various types of IT outsourcing. The common criteria are constructed by multi-criteria and success criteria, which were collected by literature review with comprehensive and comparative approach. Consequently, the researchers are able to identify a common set of criteria adopted in the variety of selection problem IT outsourcing supplier.

  10. 41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?

    Science.gov (United States)

    2010-07-01

    ... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...

  11. The Strategic Nature of Compliance

    DEFF Research Database (Denmark)

    König, Thomas; Mäder, Lars Kai

    2014-01-01

    by the anticipated enforcement decision of the monitoring agency and whether this agency is responsive to the probability of enforcement success and the potential sanctioning costs produced by noncomplying implementers. Compared to other monitoring systems, the centralized monitoring system of the European Union (EU......This compliance study models correct and timely implementation of policies in a multilevel system as a strategic game between a central monitoring agency and multiple implementers and evaluates statistically the empirical implications of this model. We test whether compliance is determined......) is praised for exemplary effectiveness, but our findings reveal that the monitoring agency refrains from enforcing compliance when the probability of success is low, and the sanctioning costs are high. This results in a compliance deficit, even though the selective enforcement activities of the monitoring...

  12. Environmental Compliance Mechanisms

    NARCIS (Netherlands)

    Merkouris, Panagiotis; Fitzmaurice, Malgosia

    2017-01-01

    Compliance mechanisms can be found in treaties regulating such diverse issues as human rights, disarmament law, and environmental law. In this bibliography, the focus will be on compliance mechanisms of multilateral environmental agreements (MEAs). Compliance with norms of international

  13. [A Method for Selecting Self-Adoptive Chromaticity of the Projected Markers].

    Science.gov (United States)

    Zhao, Shou-bo; Zhang, Fu-min; Qu, Xing-hua; Zheng, Shi-wei; Chen, Zhe

    2015-04-01

    The authors designed a self-adaptive projection system which is composed of color camera, projector and PC. In detail, digital micro-mirror device (DMD) as a spatial light modulator for the projector was introduced in the optical path to modulate the illuminant spectrum based on red, green and blue light emitting diodes (LED). However, the color visibility of active markers is affected by the screen which has unknown reflective spectrum as well. Here active markers are projected spot array. And chromaticity feature of markers is sometimes submerged in similar spectral screen. In order to enhance the color visibility of active markers relative to screen, a method for selecting self-adaptive chromaticity of the projected markers in 3D scanning metrology is described. Color camera with 3 channels limits the accuracy of device characterization. For achieving interconversion of device-independent color space and device-dependent color space, high-dimensional linear model of reflective spectrum was built. Prior training samples provide additional constraints to yield high-dimensional linear model with more than three degrees of freedom. Meanwhile, spectral power distribution of ambient light was estimated. Subsequently, markers' chromaticity in CIE color spaces was selected via maximization principle of Euclidean distance. The setting values of RGB were easily estimated via inverse transform. Finally, we implemented a typical experiment to show the performance of the proposed approach. An 24 Munsell Color Checker was used as projective screen. Color difference in the chromaticity coordinates between the active marker and the color patch was utilized to evaluate the color visibility of active markers relative to the screen. The result comparison between self-adaptive projection system and traditional diode-laser light projector was listed and discussed to highlight advantage of our proposed method.

  14. A Consistent Fuzzy Preference Relations Based ANP Model for R&D Project Selection

    Directory of Open Access Journals (Sweden)

    Chia-Hua Cheng

    2017-08-01

    Full Text Available In today’s rapidly changing economy, technology companies have to make decisions on research and development (R&D projects investment on a routine bases with such decisions having a direct impact on that company’s profitability, sustainability and future growth. Companies seeking profitable opportunities for investment and project selection must consider many factors such as resource limitations and differences in assessment, with consideration of both qualitative and quantitative criteria. Often, differences in perception by the various stakeholders hinder the attainment of a consensus of opinion and coordination efforts. Thus, in this study, a hybrid model is developed for the consideration of the complex criteria taking into account the different opinions of the various stakeholders who often come from different departments within the company and have different opinions about which direction to take. The decision-making trial and evaluation laboratory (DEMATEL approach is used to convert the cause and effect relations representing the criteria into a visual network structure. A consistent fuzzy preference relations based analytic network process (CFPR-ANP method is developed to calculate the preference-weights of the criteria based on the derived network structure. The CFPR-ANP is an improvement over the original analytic network process (ANP method in that it reduces the problem of inconsistency as well as the number of pairwise comparisons. The combined complex proportional assessment (COPRAS-G method is applied with fuzzy grey relations to resolve conflicts arising from differences in information and opinions provided by the different stakeholders about the selection of the most suitable R&D projects. This novel combination approach is then used to assist an international brand-name company to prioritize projects and make project decisions that will maximize returns and ensure sustainability for the company.

  15. Stakeholder-driven multi-attribute analysis for energy project selection under uncertainty

    International Nuclear Information System (INIS)

    Read, Laura; Madani, Kaveh; Mokhtari, Soroush; Hanks, Catherine

    2017-01-01

    In practice, selecting an energy project for development requires balancing criteria and competing stakeholder priorities to identify the best alternative. Energy source selection can be modeled as multi-criteria decision-maker problems to provide quantitative support to reconcile technical, economic, environmental, social, and political factors with respect to the stakeholders' interests. Decision making among these complex interactions should also account for the uncertainty present in the input data. In response, this work develops a stochastic decision analysis framework to evaluate alternatives by involving stakeholders to identify both quantitative and qualitative selection criteria and performance metrics which carry uncertainties. The developed framework is illustrated using a case study from Fairbanks, Alaska, where decision makers and residents must decide on a new source of energy for heating and electricity. We approach this problem in a five step methodology: (1) engaging experts (role players) to develop criteria of project performance; (2) collecting a range of quantitative and qualitative input information to determine the performance of each proposed solution according to the selected criteria; (3) performing a Monte-Carlo analysis to capture uncertainties given in the inputs; (4) applying multi-criteria decision-making, social choice (voting), and fallback bargaining methods to account for three different levels of cooperation among the stakeholders; and (5) computing an aggregate performance index (API) score for each alternative based on its performance across criteria and cooperation levels. API scores communicate relative performance between alternatives. In this way, our methodology maps uncertainty from the input data to reflect risk in the decision and incorporates varying degrees of cooperation into the analysis to identify an optimal and practical alternative. - Highlights: • We develop an applicable stakeholder-driven framework for

  16. A Hybrid Instance Selection Using Nearest-Neighbor for Cross-Project Defect Prediction

    Institute of Scientific and Technical Information of China (English)

    Duksan Ryu; Jong-In Jang; Jongmoon Baik; Member; ACM; IEEE

    2015-01-01

    Software defect prediction (SDP) is an active research field in software engineering to identify defect-prone modules. Thanks to SDP, limited testing resources can be effectively allocated to defect-prone modules. Although SDP requires suffcient local data within a company, there are cases where local data are not available, e.g., pilot projects. Companies without local data can employ cross-project defect prediction (CPDP) using external data to build classifiers. The major challenge of CPDP is different distributions between training and test data. To tackle this, instances of source data similar to target data are selected to build classifiers. Software datasets have a class imbalance problem meaning the ratio of defective class to clean class is far low. It usually lowers the performance of classifiers. We propose a Hybrid Instance Selection Using Nearest-Neighbor (HISNN) method that performs a hybrid classification selectively learning local knowledge (via k-nearest neighbor) and global knowledge (via na¨ıve Bayes). Instances having strong local knowledge are identified via nearest-neighbors with the same class label. Previous studies showed low PD (probability of detection) or high PF (probability of false alarm) which is impractical to use. The experimental results show that HISNN produces high overall performance as well as high PD and low PF.

  17. Project Management Consultancy (PMC) procurement approach: Supplier's evaluation and selection dilemma

    Science.gov (United States)

    Nawi, Mohd Nasrun Mohd; Azimi, Mohd Azrulfitri; Pozin, Mohd Affendi Ahmad; Osman, Wan Nadri; Anuar, Herman Shah

    2016-08-01

    Project Management Consultancy (PMC) is part of the management oriented procurement method in which a sole consultant is hired by the client to deal with the contactors in place of the client. Appointing contractors in this method or approach looks to be interesting as client could play a pivotal role in evaluating and selecting the supplier/contractor for the work package. In some cases, client gives the authority for the PMC to hire the supplier/contractor of their choice while in some cases the client is the one who made the decision. This research paper seeks to investigate the dilemma arises from this situation and for the purpose of this research, a real case study was studied to assess the impacts of such dilemma to the performance of the project. Recommendations on how to tackle the dilemma will also be addressed in the later part of this research paper.

  18. PROJECT W-551 DETERMINATION DATA FOR EARLY LAW INTERIM PRETREATMENT SYSTEM SELECTION

    Energy Technology Data Exchange (ETDEWEB)

    TEDESCHI AR

    2008-08-11

    This report provides the detailed assessment forms and data for selection of the solids separation and cesium separation technology for project W-551, Interim Pretreatment System. This project will provide early pretreated low activity waste feed to the Waste Treatment Plant to allow Waste Treatment Plan Low Activity Waste facility operation prior to construction completion of the Pretreatment and High Level Waste facilities. The candidate solids separations technologies are rotary microfiltration and crossflow filtration, and the candidate cesium separation technologies are fractional crystallization, caustic-side solvent extraction, and ion-exchange using spherical resorcinol-formaldehyde resin. This data was used to prepare a cross-cutting technology summary, reported in RPP-RPT-37740.

  19. PORTFOLIO SELECTION OF INFORMATION SYSTEMS PROJECTS USING PROMETHEE V WITH C-OPTIMAL CONCEPT

    Directory of Open Access Journals (Sweden)

    Jonatas A. de Almeida

    2014-05-01

    Full Text Available This paper presents a multicriteria decision model for selecting a portfolio of information system (IS projects, which integrates strategic and organizational view within a multicriteria decision structure. The PROMETHEE V method, based on outranking relations is applied, considering the c-optimal concept in order to overcome some scaling problems found in the classical PROMETHEE V approach. Then, a procedure is proposed in order to make a final analysis of the c-optimal portfolios found as a result of using PROMETHEE V. Also, the organizational view is discussed, including some factors that may influence decision making on IS projects to be included in the portfolio, such as adding the company's strategic vision and technical aspects that demonstrate how IS contributes value to a company's business.

  20. Selective elimination of intracortically projecting neurons of the rat neocortex by prenatal x-irradiation

    International Nuclear Information System (INIS)

    Jensen, K.F.

    1981-01-01

    The development of new racing methods has suggested that there are species differences in the extent of the contribution of the different layers of the neocortex to the callosal projection. The present investigation has utilized prenatal x-irradiation to selectively eliminate the late forming neurons of the supragranular layers of the rat neocortex. The reduction in the neuronal population of the supragranular layers closely parallels the reduction in the corpus callosum. These results indicate that the primary source of neurons of the callosal projection, are the late forming neurons of the supragranular layers. Thus, the current results suggest that low dose prenatal x-irradiation may be used to evaluate important developmental events in the formation of neocortical circuitry

  1. An Objective Approach to Select Climate Scenarios when Projecting Species Distribution under Climate Change.

    Directory of Open Access Journals (Sweden)

    Nicolas Casajus

    Full Text Available An impressive number of new climate change scenarios have recently become available to assess the ecological impacts of climate change. Among these impacts, shifts in species range analyzed with species distribution models are the most widely studied. Whereas it is widely recognized that the uncertainty in future climatic conditions must be taken into account in impact studies, many assessments of species range shifts still rely on just a few climate change scenarios, often selected arbitrarily. We describe a method to select objectively a subset of climate change scenarios among a large ensemble of available ones. Our k-means clustering approach reduces the number of climate change scenarios needed to project species distributions, while retaining the coverage of uncertainty in future climate conditions. We first show, for three biologically-relevant climatic variables, that a reduced number of six climate change scenarios generates average climatic conditions very close to those obtained from a set of 27 scenarios available before reduction. A case study on potential gains and losses of habitat by three northeastern American tree species shows that potential future species distributions projected from the selected six climate change scenarios are very similar to those obtained from the full set of 27, although with some spatial discrepancies at the edges of species distributions. In contrast, projections based on just a few climate models vary strongly according to the initial choice of climate models. We give clear guidance on how to reduce the number of climate change scenarios while retaining the central tendencies and coverage of uncertainty in future climatic conditions. This should be particularly useful during future climate change impact studies as more than twice as many climate models were reported in the fifth assessment report of IPCC compared to the previous one.

  2. An Objective Approach to Select Climate Scenarios when Projecting Species Distribution under Climate Change.

    Science.gov (United States)

    Casajus, Nicolas; Périé, Catherine; Logan, Travis; Lambert, Marie-Claude; de Blois, Sylvie; Berteaux, Dominique

    2016-01-01

    An impressive number of new climate change scenarios have recently become available to assess the ecological impacts of climate change. Among these impacts, shifts in species range analyzed with species distribution models are the most widely studied. Whereas it is widely recognized that the uncertainty in future climatic conditions must be taken into account in impact studies, many assessments of species range shifts still rely on just a few climate change scenarios, often selected arbitrarily. We describe a method to select objectively a subset of climate change scenarios among a large ensemble of available ones. Our k-means clustering approach reduces the number of climate change scenarios needed to project species distributions, while retaining the coverage of uncertainty in future climate conditions. We first show, for three biologically-relevant climatic variables, that a reduced number of six climate change scenarios generates average climatic conditions very close to those obtained from a set of 27 scenarios available before reduction. A case study on potential gains and losses of habitat by three northeastern American tree species shows that potential future species distributions projected from the selected six climate change scenarios are very similar to those obtained from the full set of 27, although with some spatial discrepancies at the edges of species distributions. In contrast, projections based on just a few climate models vary strongly according to the initial choice of climate models. We give clear guidance on how to reduce the number of climate change scenarios while retaining the central tendencies and coverage of uncertainty in future climatic conditions. This should be particularly useful during future climate change impact studies as more than twice as many climate models were reported in the fifth assessment report of IPCC compared to the previous one.

  3. A model for selecting project team members using multicriteria group decision making

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2010-04-01

    Full Text Available Selecting a project team is a complex multi-criteria decision-making problem. For this reason, one appropriate way to tackle such problems involves the use of multi-criteria decision aid methods. However, most of the decisions taken regarding the selection of project teams are made by a group of people. It is this which changes the focus of the problem by moving from one decision-maker (DM to a group of DMs. Analysis needs to be extended in order to consider the preference structure of each individual group member. In this paper, we present a group decision model for project team selection based on a multi-criteria evaluation of the preferences of a client's representatives. It could be applied to any decision problem since it involves a group of decision makers whose preferences diverge little. An application of the model in order to select consultants for a construction project is presented.A seleção da equipe em um projeto é um problema de decisão multicritério. Uma forma apropriada de tratar tais problemas envolve o uso de métodos de apoio multicritério a decisão. Grande parte desses problemas envolve um grupo de decisores. Dessa forma, há uma mudança no foco da decisão de um decisor para um grupo de decisores. A análise deve ser ampliada no intuito de considerar a estrutura de preferência de cada membro do grupo. Nesse artigo, apresentamos um modelo aplicado à seleção de equipe de um projeto baseado na avaliação multicritério das preferências dos representantes do cliente do projeto. Pode ser aplicado a qualquer problema de decisão desde que envolva um grupo de decisores que tenham pequena divergência em relação às suas preferências. Uma aplicação para seleção de parte da equipe de um projeto de construção é apresentada.

  4. Compliance with removable orthodontic appliances.

    Science.gov (United States)

    Shah, Nirmal

    2017-12-22

    Data sourcesMedline via OVID, PubMed, Cochrane Central Register of Controlled Trials, Web of Science Core Collection, LILACS and BBO databases. Unpublished clinical trials accessed using ClinicalTrials.gov, National Research Register, ProQuest Dissertation and Thesis database.Study selectionTwo authors searched studies from inception until May 2016 without language restrictions. Quantitative and qualitative studies incorporating objective data on compliance with removable appliances, barriers to appliance wear compliance, and interventions to improve compliance were included.Data extraction and synthesisQuality of research was assessed using the Cochrane Collaboration's risk of bias tool, the risk of bias in non-randomised studies of interventions (ROBINS-I), and the mixed methods appraisal tool. Statistical heterogeneity was investigated by examining a graphic display of the estimated compliance levels in conjunction with 95% confidence intervals and quantified using the I-squared statistic. A weighted estimate of objective compliance levels for different appliances in relation to stipulated wear and self-reported levels was also calculated. Risk of publication bias was assessed using funnel plots. Meta-regression was undertaken to assess the relative effects of appliance type on compliance levels.ResultsTwenty-four studies met the inclusion criteria. Of these, 11 were included in the quantitative synthesis. The mean duration of objectively measured wear was considerably lower than stipulated wear time amongst all appliances. Headgear had the greatest discrepancy (5.81 hours, 95% confidence interval, 4.98, 6.64). Self-reported wear time was consistently higher than objectively measured wear time amongst all appliances. Headgear had the greatest discrepancy (5.02 hours, 95% confidence interval, 3.64, 6.40). Two studies found an increase in compliance with headgear and Hawley retainers when patients were aware of monitoring. Five studies found younger age groups to

  5. A Hybrid MCDM Approach for Strategic Project Portfolio Selection of Agro By-Products

    Directory of Open Access Journals (Sweden)

    Animesh Debnath

    2017-07-01

    Full Text Available Due to the increasing size of the population, society faces several challenges for sustainable and adequate agricultural production, quality, distribution, and food safety in the strategic project portfolio selection (SPPS. The initial adaptation of strategic portfolio management of genetically modified (GM Agro by-products (Ab-Ps is a huge challenge in terms of processing the agro food product supply-chain practices in an environmentally nonthreatening way. As a solution to the challenges, the socio-economic characteristics for SPPS of GM food purchasing scenarios are studied. Evaluation and selection of the GM agro portfolio management are the dynamic issues due to physical and immaterial criteria involving a hybrid multiple criteria decision making (MCDM approach, combining modified grey Decision-Making Trial and Evaluation Laboratory (DEMATEL, Multi-Attributive Border Approximation area Comparison (MABAC and sensitivity analysis. Evaluation criteria are grouped into social, differential and beneficial clusters, and the modified DEMATEL procedure is used to derive the criteria weights. The MABAC method is applied to rank the strategic project portfolios according to the aggregated preferences of decision makers (DMs. The usefulness of the proposed research framework is validated with a case study. The GM by-products are found to be the best portfolio. Moreover, this framework can unify the policies of agro technological improvement, corporate social responsibility (CSR and agro export promotion.

  6. Selection of the best consultant for SAP ERP project using combined AHP-IBA approach

    Directory of Open Access Journals (Sweden)

    Martinović Nataša

    2014-01-01

    Full Text Available In this paper we propose a combined AHP-IBA model for selecting the best SAP consultant for an SAP ERP project. The goal of the SAP Project Manager is to choose the best consultant, the one who is able to implement standard SAP functionalities with quality and on time. When making a decision on the basis of multiple criteria, the traditional Analytic Hierarchy Process (AHP method does not take into account the fact that attributes may correlate, assuming that there are no dependencies between them. However, the dependencies of the attributes can often be used to model important knowledge for multiple criteria decision analysis. We propose an extension to the traditional AHP method by applying Interpolative realization of Boolean algebra (IBA, using AHP to determine the criteria weights, and IBA to model the logical interactions among criteria. The research conducted on ERP consultant selection suggests that the decision making process is modelled more accurately if logical interactions between attributes are modelled before applying AHP.

  7. Handbook of selected organ doses for projections common in pediatric radiology

    International Nuclear Information System (INIS)

    Rosenstein, M.; Beck, T.J.; Warner, G.G.

    1979-05-01

    This handbook contains data from which absorbed dose (mrad) to selected organs can be estimated for common projections in pediatric radiology. The organ doses are for three reference patients: a newborn (0 to 6 months), a 1-year old child, and a 5-year old child. One intent of the handbook is to permit the user to evaluate the effect on organ dose to these reference pediatric patients as a function of certain changes in technical parameters used in or among facilities. A second intent is to permit a comparison to be made of organ doses as a function of age. This comparison can be extended to a reference adult by referring to the previous Handbook of Selected Organ Doses fo Projections Common in Diagnostic Radiology, FDA 76-8031. Assignment of organ doses to individual pediatric patients using the Handbook data is not recommended unless the physical characteristics of the patient closely correlate with one of the three reference pediatric patients given in Appendix A

  8. Fringe-period selection for a multifrequency fringe-projection phase unwrapping method

    International Nuclear Information System (INIS)

    Zhang, Chunwei; Zhao, Hong; Jiang, Kejian

    2016-01-01

    The multi-frequency fringe-projection phase unwrapping method (MFPPUM) is a typical phase unwrapping algorithm for fringe projection profilometry. It has the advantage of being capable of correctly accomplishing phase unwrapping even in the presence of surface discontinuities. If the fringe frequency ratio of the MFPPUM is too large, fringe order error (FOE) may be triggered. FOE will result in phase unwrapping error. It is preferable for the phase unwrapping to be kept correct while the fewest sets of lower frequency fringe patterns are used. To achieve this goal, in this paper a parameter called fringe order inaccuracy (FOI) is defined, dominant factors which may induce FOE are theoretically analyzed, a method to optimally select the fringe periods for the MFPPUM is proposed with the aid of FOI, and experiments are conducted to research the impact of the dominant factors in phase unwrapping and demonstrate the validity of the proposed method. Some novel phenomena are revealed by these experiments. The proposed method helps to optimally select the fringe periods and detect the phase unwrapping error for the MFPPUM. (paper)

  9. Multi-period project portfolio selection under risk considerations and stochastic income

    Science.gov (United States)

    Tofighian, Ali Asghar; Moezzi, Hamid; Khakzar Barfuei, Morteza; Shafiee, Mahmood

    2018-02-01

    This paper deals with multi-period project portfolio selection problem. In this problem, the available budget is invested on the best portfolio of projects in each period such that the net profit is maximized. We also consider more realistic assumptions to cover wider range of applications than those reported in previous studies. A novel mathematical model is presented to solve the problem, considering risks, stochastic incomes, and possibility of investing extra budget in each time period. Due to the complexity of the problem, an effective meta-heuristic method hybridized with a local search procedure is presented to solve the problem. The algorithm is based on genetic algorithm (GA), which is a prominent method to solve this type of problems. The GA is enhanced by a new solution representation and well selected operators. It also is hybridized with a local search mechanism to gain better solution in shorter time. The performance of the proposed algorithm is then compared with well-known algorithms, like basic genetic algorithm (GA), particle swarm optimization (PSO), and electromagnetism-like algorithm (EM-like) by means of some prominent indicators. The computation results show the superiority of the proposed algorithm in terms of accuracy, robustness and computation time. At last, the proposed algorithm is wisely combined with PSO to improve the computing time considerably.

  10. The effect of a health communication campaign on compliance with mass drug administration for schistosomiasis control in western Kenya--the SCORE project.

    Science.gov (United States)

    Omedo, Martin; Ogutu, Michael; Awiti, Alphonce; Musuva, Rosemary; Muchiri, Geoffrey; Montgomery, Susan P; Secor, W Evan; Mwinzi, Pauline

    2014-11-01

    Compliance with mass drug administration (MDA) can be affected by rumors and mistrust about the drug. Communication campaigns are an effective way to influence attitudes and health behaviors in diverse public health contexts, but there is very little documentation about experiences using health communications in schistosomiasis control programs. A qualitative study was conducted with community health workers (CHWs) as informants to explore the effect of a health communication campaign on their experiences during subsequent praziquantel MDA for schistosomiasis. Discussions were audio-recorded, transcribed verbatim, translated into English where applicable, and analyzed thematically using ATLAS.ti software. According to the CHWs, exposure to mass media messages improved awareness of the MDA, which in turn, led to better treatment compliance. Our findings suggest that communication campaigns influence health behaviors and create awareness of schistosomiasis control interventions, which may ultimately improve praziquantel MDA. © The American Society of Tropical Medicine and Hygiene.

  11. Survey of siting practices for selected management projects in seven countries

    International Nuclear Information System (INIS)

    Hardin, E.; Aahagen, H.

    1992-06-01

    This paper surveys siting practices for deep geologic disposal in seven countries, and attempts to formulate generalizations which could be useful for the upcoming review of the Swedish plan for siting the SFL repository (R and D 92). Comparison of projects in different countries is done with full appreciation of the technical, legal, and cultural differences. The seven countries were selected for experience with siting in crystalline rock, similarity of siting practices to Sweden, and the availability of published information. Local governments have demonstrated effective veto power in each of the seven countries surveyed, although this power is exercised in different ways. This paper shows how the siting strategy itself affects the ability and the inclination of localities to block the project. It shows by example that public involvement, parallel vs. sequential characterization, schedule for siting activities, and the existence of interim waste storage capability have an impact on the success of siting. The focus of this paper is deep geologic disposal. Shallow land disposal and non-radioactive wastes are not discussed in detail, with three exceptions: LLW disposal siting in the U.S. and Canada, and the SAKAB incinerator projects in Sweden. These provide insight into siting approaches and demonstrate that conclusions regarding deep geologic disposal are supported by other experience. (114 refs.) (au)

  12. Application of Systems Engineering to U.S. Department of Energy Privatization Project Selection at the Hanford Nuclear Reservation

    International Nuclear Information System (INIS)

    Layman, John Scott

    1999-01-01

    The privatization efforts at the U.S. Department of Energy's Hanford Nuclear Reservation have been very successful primarily due to a disciplined process for project selection and execution. Early in the development of Privatization at Hanford, the Department of Energy determined that a disciplined alternatives generation and analysis (AGA) process would furnish the candidate projects with the best probability for success. Many factors had to be considered in the selection of projects. Westinghouse Hanford Company was assigned to develop this process and facilitate the selection of the first round of candidate privatization projects. Team members for the AGA process were assembled from all concerned organizations and skill groups. Among the selection criteria were legal, financial and technical considerations which had to be weighed

  13. Environmental Compliance Management System

    International Nuclear Information System (INIS)

    Brownson, L.W.; Krsul, T.; Peralta, R.A.; Knudson, D.A.; Rosignolo, C.L.

    1992-01-01

    Argonne National Laboratory (ANL) is developing the Environmental Compliance Management System (ECMS) as a comprehensive, cost-effective tool to ensure (1) that the Laboratory complies with all applicable federal and state environmental laws and regulations, (2) that environmental issues and concerns are recognized and considered in the early phases of projects; and (3) that Laboratory personnel conduct Laboratory operations in the most environmentally acceptable manner. The ECMS is an expert computer system which is designed to allow project engineers to perform an environmental evaluation of their projects. The system includes a Master Program which collects basic project information, provide utility functions, and access the environmental expert modules, environmental expert system modules for each federal and state environmental law which allows the user to obtain specific information on how an individual law may affect his project; and site-specific databases which contain information necessary for effective management of the site under environmental regulations. The ECMS will have the capability to complete and print many of the necessary environmental forms required by federal and state agencies, including the Department of Energy

  14. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    Science.gov (United States)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  15. Scarab/Saffron Development Project Case study: Material Selection Criteria for the Monoethylene Glycol Recovery Package

    International Nuclear Information System (INIS)

    Moussa, A.M.; Habib, S.; Shinaishin, A.

    2004-01-01

    MEG Recovery Unit for Scarab/Saffron development project is the first application in gas production. The Mono Ethylene Glycol Recovery Unit (MEG) recovers MEG from Water/MEG stream and removes salts and other contaminants. MEG Recovery Unit Equipment Design Criteria were designed for two parallel trains A and B, each train is capable to treat 500 bbl MEG, 1500 bbl water and 9 ton salt. The MEG unit is a combination of two unit operations; MEG Recovery unit is normally applicable in the oil and gas industries that is applying distillation technique, while the new technology is salt treatment and handling. The MEG Unit material selection is made to be suitable for the entire design life which is 25 years, the materials for MEG Recovery Unit have been selected among the available corrosion resistance alloys, where requested by the service and ambient conditions. Therefore all. the parts of the MEG unit that are in saline service are in either (2205 duplex, AISI 316L) and in Inconel alloy 625 related to operating temperature. This case study focused at Inconel alloy 625, which is selected for salt service and their operation problem occurred during the construction and operating conditions

  16. SEISMIC DESIGN REQUIREMENTS SELECTION METHODOLOGY FOR THE SLUDGE TREATMENT and M-91 SOLID WASTE PROCESSING FACILITIES PROJECTS

    International Nuclear Information System (INIS)

    RYAN GW

    2008-01-01

    In complying with direction from the U.S. Department of Energy (DOE), Richland Operations Office (RL) (07-KBC-0055, 'Direction Associated with Implementation of DOE-STD-1189 for the Sludge Treatment Project,' and 08-SED-0063, 'RL Action on the Safety Design Strategy (SDS) for Obtaining Additional Solid Waste Processing Capabilities (M-91 Project) and Use of Draft DOE-STD-I 189-YR'), it has been determined that the seismic design requirements currently in the Project Hanford Management Contract (PHMC) will be modified by DOE-STD-1189, Integration of Safety into the Design Process (March 2007 draft), for these two key PHMC projects. Seismic design requirements for other PHMC facilities and projects will remain unchanged. Considering the current early Critical Decision (CD) phases of both the Sludge Treatment Project (STP) and the Solid Waste Processing Facilities (M-91) Project and a strong intent to avoid potentially costly re-work of both engineering and nuclear safety analyses, this document describes how Fluor Hanford, Inc. (FH) will maintain compliance with the PHMC by considering both the current seismic standards referenced by DOE 0 420.1 B, Facility Safety, and draft DOE-STD-1189 (i.e., ASCE/SEI 43-05, Seismic Design Criteria for Structures, Systems, and Components in Nuclear Facilities, and ANSI ANS 2.26-2004, Categorization of Nuclear Facility Structures, Systems and Components for Seismic Design, as modified by draft DOE-STD-1189) to choose the criteria that will result in the most conservative seismic design categorization and engineering design. Following the process described in this document will result in a conservative seismic design categorization and design products. This approach is expected to resolve discrepancies between the existing and new requirements and reduce the risk that project designs and analyses will require revision when the draft DOE-STD-1189 is finalized

  17. Evaluating impacts of Clean Air Act compliance strategies

    International Nuclear Information System (INIS)

    Shirer, D.A.; Evans, R.J.; Harrison, C.D.; Kehoe, D.B.

    1993-01-01

    The Clean Air Act Amendments of 1990 requires that by the year 2000, US SO 2 emissions must be reduced by 10 million tons. This requirement will have significant impact on coal-fired electric utilities. As a result, most utilities are currently evaluating numerous compliance options, including buying allowances, coal cleaning/blending/switching, and flue gas scrubbing. Moreover, each utility must address its own unique circumstances with regard to competition, efficiency, capital expenditures, reliability, etc. and many utilities may choose a combination of compliance options to simultaneously satisfy their environmental, performance, and financial objectives. The Coal Quality Expert, which is being developed under a clean coal technology project funded by US DOE and EPRI, will predict the economic, operational, and environmental benefits of using higher-quality coals and provides an assessment of the merits of various post-combustion control technologies for specific utility applications. This paper presents background on how utilities evaluate their compliance options, and it describes how the Coal Quality Expert could be used for such evaluations in the future to assure that each utility can select the best combination of coal specifications and emission control technologies to meet its compliance objectives

  18. Channel Selection and Feature Projection for Cognitive Load Estimation Using Ambulatory EEG

    Directory of Open Access Journals (Sweden)

    Tian Lan

    2007-01-01

    Full Text Available We present an ambulatory cognitive state classification system to assess the subject's mental load based on EEG measurements. The ambulatory cognitive state estimator is utilized in the context of a real-time augmented cognition (AugCog system that aims to enhance the cognitive performance of a human user through computer-mediated assistance based on assessments of cognitive states using physiological signals including, but not limited to, EEG. This paper focuses particularly on the offline channel selection and feature projection phases of the design and aims to present mutual-information-based techniques that use a simple sample estimator for this quantity. Analyses conducted on data collected from 3 subjects performing 2 tasks (n-back/Larson at 2 difficulty levels (low/high demonstrate that the proposed mutual-information-based dimensionality reduction scheme can achieve up to 94% cognitive load estimation accuracy.

  19. Review of selected 100-N waste sites related to N-Springs remediation projects

    International Nuclear Information System (INIS)

    DeFord, D.H.; Carpenter, R.W.

    1996-01-01

    This document has been prepared in support of the environmental restoration program at the US Department of Energy's Hanford Site near Richland, Washington, by the Bechtel Hanford, Inc. Facility and Waste Site Research Office. It provides historical information that documents and characterizes selected waste sites that are related to the N-Springs remediation projects. The N-Springs are a series of small, inconspicuous groundwater seepage springs located along the Columbia River shoreline near the 100-N Reactor. The spring site is hydrologically down-gradient from several 100-N Area liquid waste sites that are believed to have been the source(s) of the effluents being discharged by the springs. This report documents and characterizes these waste sites, including the 116-N-1 Crib and Trench, 116-N-3 Crib and Trench, unplanned releases, septic tariks, and a backwash pond

  20. THE zCOSMOS-SINFONI PROJECT. I. SAMPLE SELECTION AND NATURAL-SEEING OBSERVATIONS

    Energy Technology Data Exchange (ETDEWEB)

    Mancini, C.; Renzini, A. [INAF-OAPD, Osservatorio Astronomico di Padova, Vicolo Osservatorio 5, I-35122 Padova (Italy); Foerster Schreiber, N. M.; Hicks, E. K. S.; Genzel, R.; Tacconi, L.; Davies, R. [Max-Planck-Institut fuer Extraterrestrische Physik, Giessenbachstrasse, D-85748 Garching (Germany); Cresci, G. [Osservatorio Astrofisico di Arcetri (OAF), INAF-Firenze, Largo E. Fermi 5, I-50125 Firenze (Italy); Peng, Y.; Lilly, S.; Carollo, M.; Oesch, P. [Institute of Astronomy, Department of Physics, Eidgenossische Technische Hochschule, ETH Zurich CH-8093 (Switzerland); Vergani, D.; Pozzetti, L.; Zamorani, G. [INAF-Bologna, Via Ranzani, I-40127 Bologna (Italy); Daddi, E. [CEA-Saclay, DSM/DAPNIA/Service d' Astrophysique, F-91191 Gif-Sur Yvette Cedex (France); Maraston, C. [Institute of Cosmology and Gravitation, University of Portsmouth, Dennis Sciama Building, Burnaby Road, PO1 3HE Portsmouth (United Kingdom); McCracken, H. J. [IAP, 98bis bd Arago, F-75014 Paris (France); Bouche, N. [Department of Physics, University of California, Santa Barbara, CA 93106 (United States); Shapiro, K. [Aerospace Research Laboratories, Northrop Grumman Aerospace Systems, Redondo Beach, CA 90278 (United States); and others

    2011-12-10

    The zCOSMOS-SINFONI project is aimed at studying the physical and kinematical properties of a sample of massive z {approx} 1.4-2.5 star-forming galaxies, through SINFONI near-infrared integral field spectroscopy (IFS), combined with the multiwavelength information from the zCOSMOS (COSMOS) survey. The project is based on one hour of natural-seeing observations per target, and adaptive optics (AO) follow-up for a major part of the sample, which includes 30 galaxies selected from the zCOSMOS/VIMOS spectroscopic survey. This first paper presents the sample selection, and the global physical characterization of the target galaxies from multicolor photometry, i.e., star formation rate (SFR), stellar mass, age, etc. The H{alpha} integrated properties, such as, flux, velocity dispersion, and size, are derived from the natural-seeing observations, while the follow-up AO observations will be presented in the next paper of this series. Our sample appears to be well representative of star-forming galaxies at z {approx} 2, covering a wide range in mass and SFR. The H{alpha} integrated properties of the 25 H{alpha} detected galaxies are similar to those of other IFS samples at the same redshifts. Good agreement is found among the SFRs derived from H{alpha} luminosity and other diagnostic methods, provided the extinction affecting the H{alpha} luminosity is about twice that affecting the continuum. A preliminary kinematic analysis, based on the maximum observed velocity difference across the source and on the integrated velocity dispersion, indicates that the sample splits nearly 50-50 into rotation-dominated and velocity-dispersion-dominated galaxies, in good agreement with previous surveys.

  1. Selection of dominant radionuclides for Phase 1 of the Hanford Environmental Dose Reconstruction Project

    Energy Technology Data Exchange (ETDEWEB)

    Napier, B.A.

    1991-07-01

    The objective of the Hanford Environmental Dose Reconstruction (HEDR) Project is to estimate the radiation dose that individuals could have received as a result of emissions from nuclear operations at Hanford since their inception in 1944. A vital step in the estimation of radiation doses is the determination of the source term,'' that is, the quantities of radionuclides that were released to the environment from the various Hanford operations. Hanford operations have at various times involved hundreds of different radionuclides, some in relatively large quantities. Those radionuclides present in the largest quantities, although significant from an operational handling point of view, may not necessarily have been those of greatest concern for offsite radiation dose. This report documents the selection of the dominant radionuclides (those that may have resulted in the largest portion of the received doses) in the source term for Phase 1 of the HEDR Project, that is, for atmospheric releases from 1944 through 1947 and for surface water releases from 1964 through 1966. 15 refs., 3 figs., 10 tabs.

  2. SELECTION OF PROJECT MANAGERS IN CONSTRUCTION FIRMS USING ANALYTIC HIERARCHY PROCESS (AHP AND FUZZY TOPSIS: A CASE STUDY

    Directory of Open Access Journals (Sweden)

    Fatemeh Torfi

    2011-10-01

    Full Text Available Selecting a project manager is a major decision for every construction company. Traditionally, a project manager is selected by interviewing applicants and evaluating their capabilities by considering the special requirements of the project. The interviews are usually conducted by senior managers, and the selection of the best candidate depends on their opinions. Thus, the results may not be completely reliable. Moreover, conducting interviews for a large group of candidates is time-consuming. Thus, there is a need for computational models that can be used to select the most suitable applicant, given the project specifications and the applicants’ details. In this paper, a case study is performed in which a Fuzzy Multiple Criteria Decision Making (FMCDM model is used to select the best candidate for the post of project manager in a large construction firm. First, with the opinions of the senior managers, all the criteria and sub-criteria required for the selection are gathered, and the criteria priorities are qualitatively specified. Then, the applicants are ranked using the Analytic Hierarchy Process (AHP, approximate weights of the criteria, and fuzzy technique for order performance by similarity to ideal solution (TOPSIS. The results of the case study are shown to be satisfactory.

  3. The APOSTLE project: Local Group kinematic mass constraints and simulation candidate selection

    Science.gov (United States)

    Fattahi, Azadeh; Navarro, Julio F.; Sawala, Till; Frenk, Carlos S.; Oman, Kyle A.; Crain, Robert A.; Furlong, Michelle; Schaller, Matthieu; Schaye, Joop; Theuns, Tom; Jenkins, Adrian

    2016-03-01

    We use a large sample of isolated dark matter halo pairs drawn from cosmological N-body simulations to identify candidate systems whose kinematics match that of the Local Group (LG) of galaxies. We find, in agreement with the `timing argument' and earlier work, that the separation and approach velocity of the Milky Way (MW) and Andromeda (M31) galaxies favour a total mass for the pair of ˜5 × 1012 M⊙. A mass this large, however, is difficult to reconcile with the small relative tangential velocity of the pair, as well as with the small deceleration from the Hubble flow observed for the most distant LG members. Halo pairs that match these three criteria have average masses a factor of ˜2 times smaller than suggested by the timing argument, but with large dispersion. Guided by these results, we have selected 12 halo pairs with total mass in the range 1.6-3.6 × 1012 M⊙ for the APOSTLE project (A Project Of Simulating The Local Environment), a suite of hydrodynamical resimulations at various numerical resolution levels (reaching up to ˜104 M⊙ per gas particle) that use the subgrid physics developed for the EAGLE project. These simulations reproduce, by construction, the main kinematics of the MW-M31 pair, and produce satellite populations whose overall number, luminosities, and kinematics are in good agreement with observations of the MW and M31 companions. The APOSTLE candidate systems thus provide an excellent testbed to confront directly many of the predictions of the Λ cold dark matter cosmology with observations of our local Universe.

  4. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    International Nuclear Information System (INIS)

    Matson, D M; Hyers, R W; Volkmann, T; Fecht, H-J

    2011-01-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  5. Phase selection in the mushy-zone: LODESTARS and ELFSTONE projects

    Science.gov (United States)

    Matson, D. M.; Hyers, R. W.; Volkmann, T.; Fecht, H.-J.

    2011-12-01

    In a collaboration sponsored by ESA and NASA, international partners have developed a work plan to successfully address key issues relating to understanding the role of convection on alloy phase selection for commercially important structural alloys using the MSL-EML facility aboard the International Space Station. The approach is two-pronged. First, ground and space-based experiments will develop a baseline database to anchor subsequent modelling predictions. Tasks include sample preparation and verification, ground-based transformation evaluation, space-based experiments, and thermophysical property evaluation to support modelling activities. Second, modelling and theoretical analysis tasks will lead to a new understanding of the role of convection in phase selection for this class of materials. These models will allow prediction and control of microstructural evolution during solidification processing. Tasks include modelling of macroconvection induced by the EM levitation field, modelling of microconvection within the dendrite array, nucleation modelling, and modelling of the transformation kinetics specific to each alloy system. This paper outlines how two NASA-sponsored projects relate to the goals of the international collaboration.

  6. Deadline Compliance Status Reports

    Data.gov (United States)

    Department of Housing and Urban Development — These monthly Deadline Compliance Status Reports assist Participating Jurisdictions and HUD Field Offices in monitoring compliance with the 2-year commitment and...

  7. Compliance Performance: Effects of a Provider Incentive Program and Coding Compliance Plan

    National Research Council Canada - National Science Library

    Tudela, Joseph A

    2004-01-01

    The purpose of this project is to study provider and coder related performance, i.e., provider compliance rate and coder productivity/accuracy rates and average dollar difference between coder and auditor, at Brooke Army Medical Center...

  8. Adolescents' Compliance-Resistance: Effects of Parents' Compliance Strategy and Gender.

    Science.gov (United States)

    White, Kim D.; And Others

    1989-01-01

    Examined choice of compliance-resisting behaviors among adolescents. Findings from 118 high school students revealed significant differences in resistance strategy the adolescent selected on basis of parent gender, adolescent gender, and compliance-gaining strategy (manipulation, nonnegotiation, emotional appeal, personal rejection, empathic…

  9. Compliance pluralisme and processes : Understanding compliance behavior in restaurants in China

    NARCIS (Netherlands)

    Wu, Y.

    2017-01-01

    This research aimed to offer a case study of dynamic compliance processes in selected Chinese restaurants with the main methods of participant observation and in-depth interviews. It applied an integrated and dynamic research approach, called descriptive analysis of compliance behavior, which

  10. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry.

    Science.gov (United States)

    Ortíz, Miguel A; Felizzola, Heriberto A; Nieto Isaza, Santiago

    2015-01-01

    The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also

  11. Analytical Support for Selecting the Best Investment Project in the Presence of Fuzzy Data

    Directory of Open Access Journals (Sweden)

    Kotsyuba Oleksiy S.

    2017-12-01

    Full Text Available The article is dedicated to the problem of optimal choice in the field of real investments in case of fuzzy estimates of financial and economic parameters. The general methodological basis of the research is an integrated approach to solving decision-making problems under conditions of uncertainty, conflict, and risk generated by them, based on the game theory, proposed by R. I. Trukhayev. In recent decades, it has been actively developed in papers by the followers of the scientific school of riskology under the leadership of V. V. Vitlinsky. One of the system-forming components of the above integration and game methodology is the classifier of information situations (there singled out seven of them. In this case, the description of possible states of the economic environment by a fuzzy set (a subset corresponds to the seventh information situation. An attempt was made to develop a methodical apparatus for the task of selecting the best investment project from a variety of alternative projects in the presence of fuzzy data. As a result, a model based on the use of convolutions of local criteria is formulated. In accordance with the accepted methodological guidelines, the structure of the generalized (integral indicator of the economic attractiveness (efficiency of real investment provides for three hierarchical levels: 1 the level of detailed criteria in terms of partial criteria (financial effect, profitability, payback period, 2 the level of partial criteria, 3 the level presenting the very generalized indicator. In the basic version of the proposed model, among the possible techniques (methods for aggregating indicators detailing the aspects of fuzzy estimates of partial criteria, the preference is given to the method by which they are joined by a combined, additive and multiplicative convolution.

  12. A Population of Indirect Pathway Striatal Projection Neurons Is Selectively Entrained to Parkinsonian Beta Oscillations.

    Science.gov (United States)

    Sharott, Andrew; Vinciati, Federica; Nakamura, Kouichi C; Magill, Peter J

    2017-10-11

    Classical schemes of basal ganglia organization posit that parkinsonian movement difficulties presenting after striatal dopamine depletion stem from the disproportionate firing rates of spiny projection neurons (SPNs) therein. There remains, however, a pressing need to elucidate striatal SPN firing in the context of the synchronized network oscillations that are abnormally exaggerated in cortical-basal ganglia circuits in parkinsonism. To address this, we recorded unit activities in the dorsal striatum of dopamine-intact and dopamine-depleted rats during two brain states, respectively defined by cortical slow-wave activity (SWA) and activation. Dopamine depletion escalated striatal net output but had contrasting effects on "direct pathway" SPNs (dSPNs) and "indirect pathway" SPNs (iSPNs); their firing rates became imbalanced, and they disparately engaged in network oscillations. Disturbed striatal activity dynamics relating to the slow (∼1 Hz) oscillations prevalent during SWA partly generalized to the exaggerated beta-frequency (15-30 Hz) oscillations arising during cortical activation. In both cases, SPNs exhibited higher incidences of phase-locked firing to ongoing cortical oscillations, and SPN ensembles showed higher levels of rhythmic correlated firing, after dopamine depletion. Importantly, in dopamine-depleted striatum, a widespread population of iSPNs, which often displayed excessive firing rates and aberrant phase-locked firing to cortical beta oscillations, preferentially and excessively synchronized their firing at beta frequencies. Conversely, dSPNs were neither hyperactive nor synchronized to a large extent during cortical activation. These data collectively demonstrate a cell type-selective entrainment of SPN firing to parkinsonian beta oscillations. We conclude that a population of overactive, excessively synchronized iSPNs could orchestrate these pathological rhythms in basal ganglia circuits. SIGNIFICANCE STATEMENT Chronic depletion of dopamine

  13. APPLICATION OF AHP METHOD IN THE IDENTIFICATION AND CLASSIFICATION OF PROJECT SELECTION CRITERIA: AN ENERGY SECTOR CASE STUDY

    Directory of Open Access Journals (Sweden)

    Silvério, Adriano Augusto

    2015-07-01

    Full Text Available Choosing from several alternative investment projects in hydropower to build a portfolio of projects is a complex matter. The most commonly used selection model for building the portfolio is the financial method, however it constraints options investments to the economic and financial parameters, which are limiting in nature. Alternatively, this paper proposes the use of multicriterial method Analytic Hierarchy Process – AHP, which incorporates measures to evaluate both quantitative and qualitative data. This method is based on criteria or parameters of operational processes that hinder or facilitate the execution of projects. In order to get the definition of the set of criteria, the Delphi technique was applied to a group of seven experts in managing hydropower projects. Main results show that essential criteria for selection of project investment portfolio, are not limited to financial aspects, but it involves criteria of bureaucratic, organizational, and political environment and technological characters. The conclusion is that the financial potential of hydropower projects are not the only determinants for investments on hydropower projects and, at large, these project are conditioned to other criteria such as, those of bureaucratic and technological nature.

  14. International Science Education: A Study of UNESCO Science Education Improvement Projects in Selected Anglophone Countries of Africa: Project Problems.

    Science.gov (United States)

    Nichter, Richard

    1984-01-01

    Discusses some of the problems faced by technical advisors implementing projects for the improvement of science education in Africa and reasons for these problems. Problem areas considered include underdevelopment, underestimating the process, finances, personality conflict and motivation, and opposition from key groups. (A list of major UNESCO…

  15. 24 CFR 266.520 - Program monitoring and compliance.

    Science.gov (United States)

    2010-04-01

    ... AUTHORITIES HOUSING FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Project Management and Servicing § 266.520 Program monitoring and compliance. HUD will monitor the...

  16. Project selection problem under uncertainty: An application of utility theory and chance constrained programming to a real case

    Directory of Open Access Journals (Sweden)

    Reza Hosnavi Atashgah

    2013-06-01

    Full Text Available Selecting from a pool of interdependent projects under certainty, when faced with resource constraints, has been studied well in the literature of project selection problem. After briefly reviewing and discussing popular modeling approaches for dealing with uncertainty, this paper proposes an approach based on chance constrained programming and utility theory for a certain range of problems and under some practical assumptions. Expected Utility Programming, as the proposed modeling approach, will be compared with other well-known methods and its meaningfulness and usefulness will be illustrated via two numerical examples and one real case.

  17. Selecting Health Care Improvement Projects: A Methodology Integrating Cause-and-Effect Diagram and Analytical Hierarchy Process.

    Science.gov (United States)

    Testik, Özlem Müge; Shaygan, Amir; Dasdemir, Erdi; Soydan, Guray

    It is often vital to identify, prioritize, and select quality improvement projects in a hospital. Yet, a methodology, which utilizes experts' opinions with different points of view, is needed for better decision making. The proposed methodology utilizes the cause-and-effect diagram to identify improvement projects and construct a project hierarchy for a problem. The right improvement projects are then prioritized and selected using a weighting scheme of analytical hierarchy process by aggregating experts' opinions. An approach for collecting data from experts and a graphical display for summarizing the obtained information are also provided. The methodology is implemented for improving a hospital appointment system. The top-ranked 2 major project categories for improvements were identified to be system- and accessibility-related causes (45%) and capacity-related causes (28%), respectively. For each of the major project category, subprojects were then ranked for selecting the improvement needs. The methodology is useful in cases where an aggregate decision based on experts' opinions is expected. Some suggestions for practical implementations are provided.

  18. Quality assurance plan for Final Waste Forms project in support of the development, demonstration, testing and evaluation efforts associated with the Oak Ridge reservation's LDR/FFCA compliance

    International Nuclear Information System (INIS)

    Gilliam, T.M.; Mattus, C.H.

    1994-07-01

    This quality assurance project plan specifies the data quality objectives for Phase I of the Final Waste Forms Project and defines specific measurements and processes required to achieve those objectives. Although the project is funded by the U.S. Department of Energy (DOE), the ultimate recipient of the results is the U.S. Environmental Protection Agency (EPA). Consequently, relevant quality assurance requirements from both organizations must be met. DOE emphasizes administrative structure to ensure quality; EPA's primary focus is the reproducibility of the generated data. The ten criteria of DOE Order 5700.6C are addressed in sections of this report, while the format used is that prescribed by EPA for quality assurance project plans

  19. Ground-water monitoring compliance projects for Hanford Site Facilities: Progress report for the period April 1--June 30, 1988: Volume 1, Text

    International Nuclear Information System (INIS)

    1988-09-01

    This is Volume 1 of a two-volume set of documents that describes the progress of 10 Hanford Site ground-water monitoring projects for the period April 1 to June 30, 1988. This volume discusses the projects; Volume 2 provides as-built diagrams, drilling logs, and geophysical logs for wells drilled during this period in the 100-N Area and near the 216-A-36B Crib

  20. Technology trajectories and the selection of optimal R and D project sequences

    NARCIS (Netherlands)

    van Bommel, Ties; Mahieu, R.J.; Nijssen, E.J.

    2014-01-01

    Given a set of R&D projects drawing on the same underlying technology, a technology trajectory refers to the order in which projects are executed. Due to their technological interdependence, the successful execution of one project can increase a firm's technological capability, and help to

  1. The importance of people compliance (social desirability bias) in the assessment of epilepsy prevalence in rural areas of developing countries. Results of the Atahualpa Project.

    Science.gov (United States)

    Del Brutto, Oscar H; Mera, Robertino M

    2016-12-01

    Epilepsy is a major health issue in rural areas of developing countries. However, heterogeneity of epilepsy prevalence in different studies precludes assessment of the magnitude of the problem. Using similar protocols, two population-based surveys were conducted 12 years apart (2003 and 2015) in a rural Ecuadorian village (Atahualpa). The only difference was a higher people compliance with interviewers during the second survey. Epilepsy prevalence in the 2003 survey was 13.5 per 1,000 (18/1,332) in villagers aged ≥20 years. This rate increased to 26.8 per 1,000 (41/1,530) in the 2015 survey. Thirty-three persons with epilepsy detected during the second survey lived in the village in 2003; six of them had seizures starting after 2003. Of the remaining 27 cases, 13 (48%) denied their problem during the first survey. Further interview revealed that denial was related to lack of confidence with unacquainted field personnel. Social Desirability Scale-17 scores were lower in those who admitted having epilepsy than in those who denied their condition (p = 0.048). Lack of confidence with interviewers and a social desirability bias account for a sizable proportion of epilepsy denial in the study population, and may explain heterogeneity of epilepsy prevalence reported in studies conducted in poor rural settings. Wiley Periodicals, Inc. © 2016 International League Against Epilepsy.

  2. Fringe order correction for the absolute phase recovered by two selected spatial frequency fringe projections in fringe projection profilometry.

    Science.gov (United States)

    Ding, Yi; Peng, Kai; Yu, Miao; Lu, Lei; Zhao, Kun

    2017-08-01

    The performance of the two selected spatial frequency phase unwrapping methods is limited by a phase error bound beyond which errors will occur in the fringe order leading to a significant error in the recovered absolute phase map. In this paper, we propose a method to detect and correct the wrong fringe orders. Two constraints are introduced during the fringe order determination of two selected spatial frequency phase unwrapping methods. A strategy to detect and correct the wrong fringe orders is also described. Compared with the existing methods, we do not need to estimate the threshold associated with absolute phase values to determine the fringe order error, thus making it more reliable and avoiding the procedure of search in detecting and correcting successive fringe order errors. The effectiveness of the proposed method is validated by the experimental results.

  3. Potential Science and Technology Game Changers for the Ground Warfare of 2050: Selected Projections Made in 2017

    Science.gov (United States)

    2018-02-01

    ARL-TR-8283 ● FEB 2018 US Army Research Laboratory Potential Science and Technology Game Changers for the Ground Warfare of 2050...Science and Technology Game Changers for the Ground Warfare of 2050: Selected Projections Made in 2017 by Alexander Kott Office of the Director...Brian Sadler Vehicle Technology Directorate, ARL Ananthram Swami Computational and Information Sciences Directorate, ARL Approved for

  4. Analysis of an Interactive Technology Supported Problem-Based Learning STEM Project Using Selected Learning Sciences Interest Areas (SLSIA)

    Science.gov (United States)

    Kumar, David Devraj

    2017-01-01

    This paper reports an analysis of an interactive technology-supported, problem-based learning (PBL) project in science, technology, engineering and mathematics (STEM) from a Learning Sciences perspective using the Selected Learning Sciences Interest Areas (SLSIA). The SLSIA was adapted from the "What kinds of topics do ISLS [International…

  5. 34 CFR 361.32 - Use of profitmaking organizations for on-the-job training in connection with selected projects.

    Science.gov (United States)

    2010-07-01

    ... on-the-job training in connection with selected projects. The State plan must assure that the... purpose of providing, as vocational rehabilitation services, on-the-job training and related programs for... 34 Education 2 2010-07-01 2010-07-01 false Use of profitmaking organizations for on-the-job...

  6. Canister storage building compliance assessment DOE Order 6430.1A, General Design Criteria

    International Nuclear Information System (INIS)

    BLACK, D.M.

    1999-01-01

    This document presents the Project's position on compliance with DOE Order 6430.1A ''General Design Criteria.'' No non-compliances are shown. The compliance statements have been reviewed and approved by DOE. Open items are scheduled to be closed prior to project completion

  7. PROJECTS ON AIRPORTS, AIRFIELDS, HELICOPTER AERODROMES AND LANDING GROUNDS SANITARY PROTECTION AREAS AS THE BASIS OF THEIR ACTIVITY COMPLIANCE ASSESSMENT TO ECOLOGICAL REQUIREMENTS

    Directory of Open Access Journals (Sweden)

    Oleg A. Kartyshev

    2017-01-01

    Full Text Available Ten years experience of the development of domestic airports sanitary protection zones projects in civil aviation based on Sanitary Regulations and Norms 2.2.1/2.1.1.1200-03 requirements is analyzed, the reasons of loss of quality of project works and delaying of coordination terms at the last stage of the development are established. It is shown that among the main reasons for current negative situation with projects development and coordination are: absence of a check algorithm of settlement borders of areas and contours of aviation noise with the use of natural researches methods in Sanitary Regulations and Norms 2.2.1/2.1.1.1200-03; absence of methods of amendment in projects and regulations of establishment of the airport sanitary protection zones final dimensions. Examples of oversized and undersized noise areas and ones of the polluting substances dispersion as well as the reasons of local authorities’ interests in it are given.Conceptional strategies which should be used in the edition of a new Russian conservancy normative document regulating the development of projects on sanitary protection areas. New document will allow to consider various factors of negative environmental impact of the airports, airfields, helicopter aerodromes and landing grounds activities.It is offered to introduce the concept of "aviation noise set index operational card", which will solve the legitimation problem of the aviation noise account in the State Immovable Property Cadaster. Suggestions on equivalent and maximum level magnitude of the sound made at the residential territory of cities and urban-type settlements by flights and aircraft ground operation are given.Standards are supposed to be harmonized with similar international rules and have to provide zone gradation by 5 dBA.Suggestions on the considerations of the revealed deficiencies are made, requirements to project sections structure of sanitary protection zones are formulated, proposals on the

  8. Mapping Tax Compliance

    DEFF Research Database (Denmark)

    Boll, Karen

    2014-01-01

    Tax compliance denotes the act of reporting and paying taxes in accordance with the tax laws. Current social science scholarship on tax compliance can almost entirely be divided into behavioural psychology analyses and critical tax studies. This article, which presents two cases of how tax...... compliance is constructed, challenges the explanatory reaches of today's social science approaches, arguing that an alternative approach to understanding tax compliance is worthwhile exploring. This other choice of approach, inspired by actor–network theory (ANT), adopts a more practice-oriented focus...... that studies tax compliance where it takes place as well as what it is made of. Consequently, this article argues that tax compliance is a socio-material assemblage and that complying is a distributed action. The article concludes by highlighting how an ANT approach contributes to the further theoretical...

  9. A quantitative method for selecting renewable energy projects in the mining industry based on sustainability

    OpenAIRE

    Mostert, M.

    2014-01-01

    Mining companies sponsor a range of non-core, corporate social responsibility projects to adhere to social and labour plans and environmental management prerequisites that form part of a mining licence application. Some companies go above and beyond such projects, sponsoring initiatives that generate renewable energy through solar power, wind energy, natural gas, etc. The challenge for these companies is to choose between a variety of projects to ensure maximum value, especially in times when...

  10. The role intuitive decision making plays in project selection in the residential property market: a case study of a medium sized

    OpenAIRE

    Ryan, Diarmuid

    2013-01-01

    non-peer-reviewed This thesis addresses the role of intuition in project selection in residential property development. The paper provides a comprehensive review of existing literature in relation to project selection and decision making. In addition, the examination of the project files of M.A. Ryan & Sons Ltd., a medium sized property development company, has enabled a case study to be carried out on three projects carried out by the organisation. Through the case study, t...

  11. Architecture-based regulatory compliance argumentation

    DEFF Research Database (Denmark)

    Mihaylov, Boyan; Onea, Lucian; Hansen, Klaus Marius

    2016-01-01

    Standards and regulations are difficult to understand and map to software, which makes compliance with them challenging to argue for software products and development process. This is problematic since lack of compliance may lead to issues with security, safety, and even to economic sanctions....... An increasing number of applications (for example in healthcare) are expected to have to live up to regulatory requirements in the future, which will lead to more software development projects having to deal with such requirements. We present an approach that models regulations such that compliance arguments...... the approach on the migration of the telemedicine platform Net4Care to the cloud, where certain regulations (for example privacy) should be concerned. The approach has the potential to support simpler compliance argumentation with the eventual promise of safer and more secure applications....

  12. A New Dynamic Multicriteria Decision-Making Approach for Green Supplier Selection in Construction Projects under Time Sequence

    Directory of Open Access Journals (Sweden)

    Shi Yin

    2017-01-01

    Full Text Available Nowadays, due to the lack of natural resources and environment problems which have been appearing increasingly, green building is more and more involved in the construction industry. The evaluation and selection of green supplier are a significant part of the development of green building. In this paper, we propose a new dynamic multicriteria decision-making approach in construction projects under time sequence to deal with these problems. First, the paper establishes 4 main criteria and 17 subcriteria for green supplier selection in construction projects. Then, a method considering interaction between criteria and the influence of constructors subjective preference and objective criteria information is proposed. It uses the interval-valued intuitionistic fuzzy geometric weighted Heronian means (IVIFGWHM operator and multitarget nonlinear programming model to calculate the comprehensive evaluation results of potential green suppliers. The proposed method is much easier for constructors to select green supplier and make the localization of green supplier more practical and accurate in construction projects. Finally, a case study about a green building project is given to verify practicality and effectiveness of the proposed approach.

  13. Site specific statutory compliance planning for the salt repository project at the Deaf Smith County Site, Texas: Requirements, strategy, and status: Revision 4

    International Nuclear Information System (INIS)

    1986-06-01

    This document and the requirements and actions it presents are addressed to the Deaf Smith County Site, Texas. The proposed actions upon which the plan is based are those described in Chapters 4 and 5 of the final EA for the site. Similarly, the environmental and health and safety requirements covered in the plan are those identified in the EA as being potentially applicable to the salt repository project at the Deaf Smith site. 12 figs., 8 tabs

  14. Predicting and Mapping Potential Whooping Crane Stopover Habitat to Guide Site Selection for Wind Energy Projects

    Science.gov (United States)

    Migration is one of the most poorly understood components of a bird’s life cycle. For that reason, migratory stopover habitats are often not part of conservation planning and may be overlooked when planning new development projects. This project highlights and addresses an overl...

  15. Study of decision framework of wind farm project plan selection under intuitionistic fuzzy set and fuzzy measure environment

    International Nuclear Information System (INIS)

    Wu, Yunna; Geng, Shuai; Xu, Hu; Zhang, Haobo

    2014-01-01

    Highlights: • Experts’ opinions are expressed by using the intuitionistic fuzzy values. • Fuzzy measure is used to solve the dependence problem of criteria. • The compensatory problem of performance scores is reasonably processed. - Abstract: Project selection plays an important role in the entire life cycle of wind farm project and the multi-criteria decision making (MCDM) methods are very important in the whole wind farm project plan selection process. There are problems in the present MCDM methods decrease evaluation quality of the wind farm project plans: first, the information loss exists in the wind farm project plan evaluation process. Second, it is difficult to satisfy the independent assumption of the multi-criteria decision making methods used in the wind farm project plan evaluation in fact. Third, the compensatory problem of performance scores of the wind farm project plans is processed unreasonably. Hence the innovation points of this paper are as follows: first, the intuitionistic fuzzy numbers are used instead of fuzzy numbers or numerical values to reflect the experts’ intuitive preferences to decrease the probability of information loss; second, the fuzzy measure is used to rate the important degrees of criteria in order to avoid the independent assumption and to increase the reasonability; third, the partial compensatory problem of performance scores is well processed by using intuitionistic fuzzy Choquet (IFC) operator and generalized intuitionistic fuzzy ordered geometric averaging (GIFOGA) operator. These operators can deal with the compensatory performance scores and non-compensatory performance scores respectively. Finally, a case study demonstrates the effectiveness of decision framework

  16. Discounted Cash Flow and Modern Asset Pricing Methods - Project Selection and Policy Implications

    Energy Technology Data Exchange (ETDEWEB)

    Emhjellen, Magne; Alaouze, Chris M.

    2002-07-01

    We examine the differences in the net present values (NPV's) of North Sea oil projects obtained using the Weighted Average Cost of Capital (WACC) and a Modern Asset Pricing (MAP) method which involves the separate discounting of project cash flow components. NPV differences of more than $1 Om were found for some oil projects. Thus, the choice of valuation method will affect the development decisions of oil companies. The results of the MAP method are very sensitive to the choice of parameter values for the stochastic process used to model oil prices. Further research is recommended before the MAP method is used as the sole valuation model. (author)

  17. Discounted Cash Flow and Modern Asset Pricing Methods - Project Selection and Policy Implications

    International Nuclear Information System (INIS)

    Emhjellen, Magne; Alaouze, Chris M.

    2002-01-01

    We examine the differences in the net present values (NPV's) of North Sea oil projects obtained using the Weighted Average Cost of Capital (WACC) and a Modern Asset Pricing (MAP) method which involves the separate discounting of project cash flow components. NPV differences of more than $1 Om were found for some oil projects. Thus, the choice of valuation method will affect the development decisions of oil companies. The results of the MAP method are very sensitive to the choice of parameter values for the stochastic process used to model oil prices. Further research is recommended before the MAP method is used as the sole valuation model. (author)

  18. Discounted Cash Flow and Modern Asset Pricing Methods - Project Selection and Policy Implications

    Energy Technology Data Exchange (ETDEWEB)

    Emhjellen, Magne; Alaouze, Chris M

    2002-07-01

    We examine the differences in the net present values (NPV's) of North Sea oil projects obtained using the Weighted Average Cost of Capital (WACC) and a Modern Asset Pricing (MAP) method which involves the separate discounting of project cash flow components. NPV differences of more than $1 Om were found for some oil projects. Thus, the choice of valuation method will affect the development decisions of oil companies. The results of the MAP method are very sensitive to the choice of parameter values for the stochastic process used to model oil prices. Further research is recommended before the MAP method is used as the sole valuation model. (author)

  19. A comparison of discounted cashflow and modern asset pricing methods - project selection and policy implications

    International Nuclear Information System (INIS)

    Emhjellen, Magne; Alaouze, Chris M.

    2003-01-01

    We examine the differences in the net present values (NPVs) of North Sea oil projects obtained using the weighted average cost of capital and a modern asset pricing (MAP) method which involves the separate discounting of project cashflow components. NPV differences of more than $10 million were found for some oil projects. Thus, the choice of valuation method will affect the development decisions of oil companies and could influence tax policy. The results of the MAP method are very sensitive to the choice of parameter values for the stochastic process used to model oil prices. Further research is recommended before the MAP method is used as the sole valuation model

  20. Compliance and treatment satisfaction of post menopausal women treated for osteoporosis. Compliance with osteoporosis treatment

    Directory of Open Access Journals (Sweden)

    Huas Dominique

    2010-08-01

    Full Text Available Abstract Background Adherence to anti-osteoporosis treatments is poor, exposing treated women to increased fracture risk. Determinants of poor adherence are poorly understood. The study aims to determine physician- and patient- rated treatment compliance with osteoporosis treatments and to evaluate factors influencing compliance. Methods This was an observational, cross-sectional pharmacoepidemiological study with a randomly-selected sample of 420 GPs, 154 rheumatologists and 110 gynaecologists practicing in France. Investigators included post-menopausal women with a diagnosis of osteoporosis and a treatment initiated in the previous six months. Investigators completed a questionnaire on clinical features, treatments and medical history, and on patient compliance. Patients completed a questionnaire on sociodemographic features, lifestyle, attitudes and knowledge about osteoporosis, treatment compliance, treatment satisfaction and quality of life. Treatment compliance was evaluated with the Morisky Medication-taking Adherence Scale. Variables collected in the questionnaires were evaluated for association with compliance using multivariate logistic regression analysis. Results 785 women were evaluated. Physicians considered 95.4% of the sample to be compliant, but only 65.5% of women considered themselves compliant. The correlation between patient and physician perceptions of compliance was low (κ: 0.11 [95% CI: 0.06 to 0.16]. Patient-rated compliance was highest for monthly bisphosphonates (79.7% and lowest for hormone substitution therapy (50.0%. Six variables were associated with compliance: treatment administration frequency, perceptions of long-term treatment acceptability, perceptions of health consequences of osteoporosis, perceptions of knowledge about osteoporosis, exercise and mental quality of life. Conclusion Compliance to anti-osteoporosis treatments is poor. Reduction of dosing regimen frequency and patient education may be useful

  1. Choices that increase compliance

    International Nuclear Information System (INIS)

    Edwards, P.R.

    1991-01-01

    A compliance model is developed and tested using a survey of corporate officials and the regulatory arena of equal employment opportunity. Findings support the economic model of compliance in its conclusion that probability of detection and probable level of sanctions influence compliance decisions. Results also indicate that adjustments to the model that account for bounded rationality are valid. The key outcome, however, is that although all types of investigations play some role in enhancing compliance, those that stress sanctions and thus severity rather than certainty of detection may have the greatest positive influence on compliance. Enforcement programs attempting to operate simply as investigators of small-scale complaints will have less success than those with different types of investigations or a balanced type of single investigation. The results also suggest a more complex cognitive process on the part of regulated individuals than initially theorized. 34 refs., 3 tabs

  2. 76 FR 11554 - Fiscal Year 2010 Public Transportation on Indian Reservations Program Project Selections

    Science.gov (United States)

    2011-03-02

    ... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Fiscal Year 2010 Public Transportation... Interior for public transportation capital projects, operating costs and planning activities that are... authorized by the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users...

  3. Review of selected contributions of the conference 'Project control in quality management systems'

    International Nuclear Information System (INIS)

    2008-04-01

    There were 12 contributions presented of the conference focused on the project management in quality management systems. Contributions were focused both on theoretical problems from the project management area and on the applications in practice in management systems implementation in accordance with the standards: STN EN ISO 9001:2000, STN EN ISO 14 001:2005, and OHSAS 18 001:1999. One contribution was focused on the project management in the project of preparation of finishing of the building of the Nuclear Power Plant Mochovce of 3. and 4. block and one contribution was focused on the amendment of the Atomic Act or on the preparation of the new Atomic Act with regard to duty of transposition of the Directive of the Council 2006/117/Euratom on control and supervision of the overseas transportations of radioactive waste and nuclear fuel burnt-up into legislation of the Slovak Republic

  4. Field verification of social and environmental issues of selected water sector projects in Punjab-Pakistan

    International Nuclear Information System (INIS)

    Ayesha, A.

    2012-01-01

    Irrigation helps in increasing the agricultural yield and the irrigation projects are carried out for the welfare of people. The importance of environment for sustainable development of irrigation projects has been realized. Environmental Impact Assessment is being increasingly used as a tool for appropriate environmental planning. In Pakistan, PEP A (Pakistan Environmental Protection Act),1997 establishes the framework to carry out Environmental Assessment of development projects. Various national and international agencies have developed Environmental Assessment Guidelines and Checklists for systematic evaluation of environmental impacts and their mitigation. The Social and Environmental Management Unit of Punjab Irrigation and Drainage Authority developed checklist for assessment of irrigation projects in 2007. The present study was conducted on three water sector projects namely: Concrete Lining of Dhudi Minor, Improving Nikki Deg Drain System and Rehabilitation of Khanki Barrage. The field verification of social and environmental issues of the projects was carried out according to the checklist of Social and Environmental Management Unit. The most noticeable impacts which were identified include: extended canal closure, emissions and effluents, waste generation and disposal, effect on flora, public health and safety, land acquisition, and social issues. The mitigatory measures proposed: proper project scheduling to minimize the canal closure periods, waste disposal through proper planning, preparation of detailed resettlement action plans and compensation, location of labor camps away from the settlements, avoiding unnecessary cutting of trees, and deployed machinery should be in good working condition. The recommendations of the study are to review and improve the checklists through a gradual and phased process into a more comprehensive social and environmental assessment process; capacity building of all the stake holders; collaboration between different

  5. Environmental compliance assessment findings for Weldon Spring Site Remedial Action Program

    International Nuclear Information System (INIS)

    Sigmon, C.F.; Levine, M.B.

    1990-01-01

    This report presents the results of an environmental assessment conducted at Weldon Spring Site Remedial Action Project (WSSRAP) in St. Charles County, Missouri, in accordance with the Formerly Utilized Sites Remedial Action Program (FUSRAP) Environmental Compliance Assessment Checklists. The purpose of this assessment was to evaluate the compliance of the site with applicable federal and Missouri environment regulations. Assessments activities included the following: review of site records, reports ,and files; inspection of the WSSRAP storage building, other selected buildings, and the adjacent grounds; and interviews with project personnel. This assessment was conducted on August 28-30, 1989. The assessment covered five management areas as set forth in the Checklist: Hazardous Waste Management, Polychlorinated Biphenyls (PCBs) Management; Air Emissions; Wastewater Discharges and Petroleum Management. No samples were collected. 1 ref., 2 figs., 1 tab

  6. Selection Methodology Approach to Preferable and Alternative Sites for the First NPP Project in Yemen

    Energy Technology Data Exchange (ETDEWEB)

    Kassim, Moath [Kyunghe Univ., Yongin (Korea, Republic of); Kessel, David S. [KEPCO International Nuclear Graduate School, Ulsan (Korea, Republic of)

    2015-05-15

    The purpose of this paper is to briefly present the methodology and results of the first siting study for the first nuclear power plant (NPP) in Yemen. In this study it has been demonstrated that there are suitable sites for specific unit/units power of 1000 MWt (about 300 MWe) nuclear power plant. To perform the site selection, a systematic selection method was developed. The method uses site-specific data gathered by literature review and expert judgement to identify the most important site selection criteria. A two-step site selection process was used. Candidate sites were chosen that meet a subset of the selection criteria that form the most important system constraints. These candidate sites were then evaluated against the full set of selection criteria using the Analytical Hierarchy Process Method (AHP). Candidate sites underwent a set of more specific siting criteria weighted by expert judgment to select preferable sites and alternatives using AHP method again. Expert Judgment method was used to rank and weight the importance of each criteria, then AHP method used to evaluate and weight the relation between criterion to criterion and between all criteria against the global weight. Then logical decision software was used to rank sites upon their weighting value.

  7. Selection Methodology Approach to Preferable and Alternative Sites for the First NPP Project in Yemen

    International Nuclear Information System (INIS)

    Kassim, Moath; Kessel, David S.

    2015-01-01

    The purpose of this paper is to briefly present the methodology and results of the first siting study for the first nuclear power plant (NPP) in Yemen. In this study it has been demonstrated that there are suitable sites for specific unit/units power of 1000 MWt (about 300 MWe) nuclear power plant. To perform the site selection, a systematic selection method was developed. The method uses site-specific data gathered by literature review and expert judgement to identify the most important site selection criteria. A two-step site selection process was used. Candidate sites were chosen that meet a subset of the selection criteria that form the most important system constraints. These candidate sites were then evaluated against the full set of selection criteria using the Analytical Hierarchy Process Method (AHP). Candidate sites underwent a set of more specific siting criteria weighted by expert judgment to select preferable sites and alternatives using AHP method again. Expert Judgment method was used to rank and weight the importance of each criteria, then AHP method used to evaluate and weight the relation between criterion to criterion and between all criteria against the global weight. Then logical decision software was used to rank sites upon their weighting value

  8. Compliance and Enforcement Actions (CEA) -

    Data.gov (United States)

    Department of Transportation — Compliance and Enforcement Actions application provides process assistance / improvements for conducting investigation and enforcement activities. The Compliance and...

  9. Structuring and financing new nuclear power plant projects in Europe: selected remarks

    International Nuclear Information System (INIS)

    Belchev, A.

    2004-01-01

    Project financing in the field of nuclear energy is discussed taking into account the changes and new challenges in Europe. Bringing a project to maturity under 'revised' assumptions is likely to be a complex task for all parties involved, but there is a real potential for an enhanced role for stake holders from the private sector. There is a more realistic understanding about how the public and the private sectors can work together. Successfully combining public and private, national and foreign stake holders is likely to be a critical factor of success. The alignment of interest over the long term best serves a projects business case. In that context, a Governments policies are increasingly under the spotlight

  10. Evaluation of the Montana Department of Transportation's research project solicitation, prioritization, and selection process

    Science.gov (United States)

    2008-05-01

    The Montana Department of Transportation (MDT) contracted the Bureau of Business and Economic Research at the University of Montana Missoula to conduct research to determine how other states solicit, prioritize, and select research problem statem...

  11. Metholology for the selection of LWR safety R and D projects. Phase I, status report

    International Nuclear Information System (INIS)

    El-Sheikh, K.A.

    1980-03-01

    The objective of the LWR R and D Selection Methodology Program is to develop and demonstrate an R and D selection methodology appropriate for LWR safety technology. This report documents the development work from the program beginning in April, 1979 to the end of Fiscal Year 1979. The scope of work for this period included three tasks; methodology review (Task 1), measures development (Task 2), and methodology development for the first phase of application (Task 3). The accomplishments of these tasks are presented

  12. Seismic safety margins research program. Phase I final report - Plant/site selection and data collection (Project I)

    International Nuclear Information System (INIS)

    Chuang, T.Y.

    1981-07-01

    Project I of Phase I of the Seismic Safety Margins Research Program (SSMRP) comprised two parts: the selection of a representative nuclear power plant/site for study in Phase I and the collection of data needed by the other SSMRP projects. Unit 1 of the Zion Nuclear Power Plant in Zion, Illinois, was selected for the SSMRP Phase I studies. Unit 1 of the Zion plant has been validated as a good choice for the Phase I study plant. Although no single nuclear power plant can represent all such plants equally well, selection criteria were developed to maximize the generic implications of Phase I of the SSMRP. On the basis of the selection criteria, the Zion plant and its site were found to be reasonably representative of operating and future plants with regard to its nuclear steam supply system; the type of containment structure (prestressed concrete); its electrical capacity (1100 MWe); its location (the Midwest); the peak seismic acceleration used for design (0.17g); and the properties of the underlying soil (the low-strain shear-wave velocity is 1650 ft/s in a 50- to 100-ft-thick layer of soil overlying sedimentary bedrock). (author)

  13. Ecological Monitoring and Compliance Program 2006 Report

    Energy Technology Data Exchange (ETDEWEB)

    David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

    2007-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows

  14. Ecological Monitoring and Compliance Program 2006 Report

    Energy Technology Data Exchange (ETDEWEB)

    David C. Anderson; Paul D. Greger; Derek B. Hall; Dennis J. Hansen; William K. Ostler

    2007-03-01

    The Ecological Monitoring and Compliance program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by National Security Technologies LLC (NSTec) during the Calendar Year 2006. Program activities included: (a) biological surveys at proposed construction sites, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) monitoring of the Nonproliferation Test and Evaluation Complex (NPTEC). Sensitive and protected/regulated species of the NTS include 44 plants, 1 mollusk, 2 reptiles, over 250 birds, and 26 mammals protected, managed, or considered sensitive as per state or federal regulations and natural resource agencies and organizations. The threatened desert tortoise (Gopherus agassizii) is the only species on the NTS protected under the Endangered Species Act. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 34 projects. A total of 342.1 hectares (ha) (845.37 acres [ac]) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found included: 2 inactive tortoise burrows, 2 western burrowing owls (Athene cunicularia hypugaea), several horses (Equus caballus), 2 active predator burrows, mature Joshua trees (Yucca brevifolia), yuccas and cacti; and also 1 bird nest (2 eggs), 1 barn owl (Tyto alba) and 2 great-horned owls (Bubo virginianus). NSTec provided a written summary report of all survey findings and mitigation recommendations, where applicable. All flagged burrows

  15. Uninformative variable elimination assisted by Gram-Schmidt Orthogonalization/successive projection algorithm for descriptor selection in QSAR

    DEFF Research Database (Denmark)

    Omidikia, Nematollah; Kompany-Zareh, Mohsen

    2013-01-01

    Employment of Uninformative Variable Elimination (UVE) as a robust variable selection method is reported in this study. Each regression coefficient represents the contribution of the corresponding variable in the established model, but in the presence of uninformative variables as well as colline......Employment of Uninformative Variable Elimination (UVE) as a robust variable selection method is reported in this study. Each regression coefficient represents the contribution of the corresponding variable in the established model, but in the presence of uninformative variables as well...... as collinearity reliability of the regression coefficient's magnitude is suspicious. Successive Projection Algorithm (SPA) and Gram-Schmidt Orthogonalization (GSO) were implemented as pre-selection technique for removing collinearity and redundancy among variables in the model. Uninformative variable elimination...

  16. Projectables

    DEFF Research Database (Denmark)

    Rasmussen, Troels A.; Merritt, Timothy R.

    2017-01-01

    CNC cutting machines have become essential tools for designers and architects enabling rapid prototyping, model-building and production of high quality components. Designers often cut from new materials, discarding the irregularly shaped remains. We introduce ProjecTables, a visual augmented...... reality system for interactive packing of model parts onto sheet materials. ProjecTables enables designers to (re)use scrap materials for CNC cutting that would have been previously thrown away, at the same time supporting aesthetic choices related to wood grain, avoiding surface blemishes, and other...... relevant material properties. We conducted evaluations of ProjecTables with design students from Aarhus School of Architecture, demonstrating that participants could quickly and easily place and orient model parts reducing material waste. Contextual interviews and ideation sessions led to a deeper...

  17. Regulatory Enforcement and Compliance

    DEFF Research Database (Denmark)

    May, Peter J.; Winter, Søren

    1999-01-01

    This study of municipal enforcement of agro-environmental regulations in Denmark provides an empirical understanding of how enforcement affects compliance. A key contribution is sorting out the relative influence of inspectors' different styles of enforcement and choices made by enforcement...... agencies. The latter are shown to be more important in bringing about compliance than are inspectors' enforcement styles. Municipal agencies are shown to increase compliance through the use of third parties, more frequent inspection, and setting priorities for inspection of major items. The findings about...

  18. 7 CFR 1901.204 - Compliance reviews.

    Science.gov (United States)

    2010-01-01

    ... Housing Project. (ii) The borrower's method of advertising the facility to the public, if there is any advertising, including how well these methods reach the minority community. (iii) Any records of request for... Director will immediately send a copy of the compliance review report to the Administrator, Attention...

  19. OPPA Project: Modernization of practical education of CTU FNSPE Nuclear Engineering students - two selected exercises

    International Nuclear Information System (INIS)

    Prusa, P.; Musilek, L.

    2014-01-01

    The project under the title OPPA CZ.2.17/3.1.00/36038 'Modernization of Practical Education of CTU FNSPE Nuclear Engineering students' provides an opportunity to innovate existing exercises and set up new experimental exercises. The Department of Dosimetry and Application of Ionising Radiation has prepared or innovated the exercises which are described. (authors)

  20. Artificial neural network decision support systems for new product development project selection

    NARCIS (Netherlands)

    Thieme, R.J.; Song, Michael; Calantone, R.J.

    2000-01-01

    The authors extend and develop an artificial neural network decision support system and demonstrate how it can guide managers when they make complex new product development decisions. The authors use data from 612 projects to compare this new method with traditional methods for predicting various

  1. Oracle convergence rate of posterior under projection prior and Bayesian model selection

    NARCIS (Netherlands)

    Babenko, A.; Belitser, E.N.

    2010-01-01

    We apply the Bayes approach to the problem of projection estimation of a signal observed in the Gaussian white noise model and we study the rate at which the posterior distribution concentrates about the true signal from the space ℓ2 as the information in observations tends to infinity. A benchmark

  2. Oracle convergence rate of posterior under projection prior and Bayesian model selection

    NARCIS (Netherlands)

    Babenko, A.; Belitser, E.

    2010-01-01

    We apply the Bayes approach to the problem of projection estimation of a signal observed in the Gaussian white noise model and we study the rate at which the posterior distribution concentrates about the true signal from the space l2 as the information in observations tends to infinity. A benchmark

  3. A conceptual decision model for investment project appraisal and selection procedure

    NARCIS (Netherlands)

    Vajarothai, Pintip; Al-Jibouri, Saad H.S.; Halman, Johannes I.M.

    2015-01-01

    Organisations in public or private sector invest in projects to meet strategic objectives; to solve a problem, respond to specific needs or to realize investment opportunities. Governments, particularly in developing countries, face increasing demands of society for more and better services.

  4. The rationale for selecting the method of calculation of project products coast (works, services

    Directory of Open Access Journals (Sweden)

    O. V. Molchanova

    2017-01-01

    Full Text Available In modern conditions of management it is necessary to develop a number of recommendations on the introduction of management accounting at state-owned enterprises that carry out revenue-generating activities or based on the right of economic management. It is necessary to apply the correct cost-accounting method for the production of products, works, services for a more rational calculation of the cost price. This will allow management personnel to receive timely objective information about their cost price, identify the feasibility of production and sales, justify the assortment, plan profits. The procedure for determining the cost price of the project products (works, services in the theory and practice of the state enterprise of the Astrakhan region “Kasprybproekt” is investigated in the work. With the existing practice of planning in design organizations, the planned cost price of design and survey works for established cost items is planned in the cost estimate for production by the design organization as a whole and by the types of work: design, survey and others, without subdividing it by orders (projects. According to this, accounting of the actual costs for work in the design organizations is based. The study showed that the state enterprise of the Astrakhan region “Kasprybproyekt” performs different projects with different execution periods; therefore, it is advisable to use one method of calculating the cost price - job (order costing method, and link it to the responsibility centers depending on the department of the performer. Based on the research of the used method to the cost price calculate of the project products (works, services in the state enterprise of the Astrakhan region “Kasprybproekt”, it was proposed to use the job (order costing method that allows to detail all the project costs without distorting the final financial result and optimize the project costs. If the calculation method is correctly determined

  5. 28 CFR 73.4 - Partial compliance not deemed compliance.

    Science.gov (United States)

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Partial compliance not deemed compliance. 73.4 Section 73.4 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED) NOTIFICATIONS TO THE ATTORNEY GENERAL BY AGENTS OF FOREIGN GOVERNMENTS § 73.4 Partial compliance not deemed compliance. The fact...

  6. Survey and analysis of selected jointly owned large-scale electric utility storage projects

    Energy Technology Data Exchange (ETDEWEB)

    1982-05-01

    The objective of this study was to examine and document the issues surrounding the curtailment in commercialization of large-scale electric storage projects. It was sensed that if these issues could be uncovered, then efforts might be directed toward clearing away these barriers and allowing these technologies to penetrate the market to their maximum potential. Joint-ownership of these projects was seen as a possible solution to overcoming the major barriers, particularly economic barriers, of commercializaton. Therefore, discussions with partners involved in four pumped storage projects took place to identify the difficulties and advantages of joint-ownership agreements. The four plants surveyed included Yards Creek (Public Service Electric and Gas and Jersey Central Power and Light); Seneca (Pennsylvania Electric and Cleveland Electric Illuminating Company); Ludington (Consumers Power and Detroit Edison, and Bath County (Virginia Electric Power Company and Allegheny Power System, Inc.). Also investigated were several pumped storage projects which were never completed. These included Blue Ridge (American Electric Power); Cornwall (Consolidated Edison); Davis (Allegheny Power System, Inc.) and Kttatiny Mountain (General Public Utilities). Institutional, regulatory, technical, environmental, economic, and special issues at each project were investgated, and the conclusions relative to each issue are presented. The major barriers preventing the growth of energy storage are the high cost of these systems in times of extremely high cost of capital, diminishing load growth and regulatory influences which will not allow the building of large-scale storage systems due to environmental objections or other reasons. However, the future for energy storage looks viable despite difficult economic times for the utility industry. Joint-ownership can ease some of the economic hardships for utilites which demonstrate a need for energy storage.

  7. Design of Laser Based Monitoring Systems for Compliance Management of Odorous and Hazardous Air Pollutants in Selected Chemical Industrial Estates at Hyderabad, India

    Science.gov (United States)

    Sudhakar, P.; Kalavathi, P.; Ramakrishna Rao, D.; Satyanarayna, M.

    2014-12-01

    Industrialization can no longer sustain without internalization of the concerns of the receiving environment and land-use. Increased awareness and public pressure, coupled with regulatory instruments and bodies exert constant pressure on industries to control their emissions to a level acceptable to the receiving environment. However, when a group of industries come-up together as an industrial estate, the cumulative impacts of all the industries together often challenges the expected/desired quality of receiving environment, requiring stringent pollution control and monitoring measures. Laser remote sensing techniques provide powerful tools for environmental monitoring. These methods provide range resolved measurements of concentrations of various gaseous pollutants and suspended particulate matter (SPM) not only in the path of the beam but over the entire area. A three dimensional mapping of the pollutants and their dispersal can be estimated using the laser remote sensing methods on a continuous basis. Laser Radar (Lidar) systems are the measurements technology used in the laser remote sensing methods. Differential absorption lidar (DIAL) and Raman Lidar technologies have proved to be very useful for remote sensing of air pollutants. DIAL and Raman lidar systems can be applied for range resolved measurements of molecules like SO2, NO2, O3 Hg, CO, C2H4, H2O, CH4, hydrocarbons etc. in real time on a continuous basis. This paper describes the design details of the DAIL and Raman lidar techniques for measurement of various hazardous air pollutants which are being released into the atmosphere by the chemical industries operating in the Bachupally industrial Estate area at Hyderabad, India. The relative merits of the two techniques have been studied and the minimum concentration of pollutants that can be measured using these systems are presented. A dispersion model of the air pollutants in the selected chemical industrial estates at Hyderabad has been developed.

  8. THE PROJECT OF THE EXPERT SYSTEM TO SUPPORTING OF SELECTION OF PARTS AND ASSEMBLIES OF MACHINES

    Directory of Open Access Journals (Sweden)

    Sebastian RZYDZIK

    2014-06-01

    Full Text Available This paper the design of the expert system that supports mechanical engineer in the process of selecting the parts and assemblies was presented. In the description of the proposed expert system, was made reference to the general form of such systems, that consist of such components as: user interface, inference engine, knowledge base and database. It also, scenario that describes the steps of the use of the proposed expert system was presented. Finally, an example of the use the expert system during the selection of the components of the drive system was shown.

  9. Performance-Based Technology Selection Filter description report. INEL Buried Waste Integrated Demonstration System Analysis project

    Energy Technology Data Exchange (ETDEWEB)

    O`Brien, M.C.; Morrison, J.L.; Morneau, R.A.; Rudin, M.J.; Richardson, J.G.

    1992-05-01

    A formal methodology has been developed for identifying technology gaps and assessing innovative or postulated technologies for inclusion in proposed Buried Waste Integrated Demonstration (BWID) remediation systems. Called the Performance-Based Technology Selection Filter, the methodology provides a formalized selection process where technologies and systems are rated and assessments made based on performance measures, and regulatory and technical requirements. The results are auditable, and can be validated with field data. This analysis methodology will be applied to the remedial action of transuranic contaminated waste pits and trenches buried at the Idaho National Engineering Laboratory (INEL).

  10. 340 Facility compliance assessment

    International Nuclear Information System (INIS)

    English, S.L.

    1993-10-01

    This study provides an environmental compliance evaluation of the RLWS and the RPS systems of the 340 Facility. The emphasis of the evaluation centers on compliance with WAC requirements for hazardous and mixed waste facilities, federal regulations, and Westinghouse Hanford Company (WHC) requirements pertinent to the operation of the 340 Facility. The 340 Facility is not covered under either an interim status Part A permit or a RCRA Part B permit. The detailed discussion of compliance deficiencies are summarized in Section 2.0. This includes items of significance that require action to ensure facility compliance with WAC, federal regulations, and WHC requirements. Outstanding issues exist for radioactive airborne effluent sampling and monitoring, radioactive liquid effluent sampling and monitoring, non-radioactive liquid effluent sampling and monitoring, less than 90 day waste storage tanks, and requirements for a permitted facility

  11. Environmental Compliance Issue Coordination

    Science.gov (United States)

    An order to establish the Department of Energy (DOE) requirements for coordination of significant environmental compliance issues to ensure timely development and consistent application of Departmental environmental policy and guidance

  12. Mitigation of Selected Hanford Site Manhattan Project and Cold War Era Artifacts

    International Nuclear Information System (INIS)

    Prendergast-Kennedy, Ellen L.; Harvey, David W.

    2006-01-01

    This document is the first time that Manhattan Project and Cold War era artifacts from the Hanford Site have been assembled within a publication. The publication presents photographic and written documentation of a number of Manhattan Project and Cold War era artifacts that were identified and tagged during assessment walk throughs of historic buildings on the Hanford Site but which could not be curated within the Hanford collection because they were too large for long-term storage and/or exhibit purposes or were radiologically contaminated. The significance of the artifacts in this publication and a proposed future appendix is based not on the individual significance of any single artifact but on their collective contribution to the science and engineering of creating plutonium and advancing nuclear technology in nuclear fuel and power.

  13. Comparison of selected approaches to finance renewable energy projects in European countries

    International Nuclear Information System (INIS)

    Langniss, O.

    1999-01-01

    A large number of proven technical solutions exists for the use of renewable energies. However, their dissemination is still too slow to meet the political goal of substituting for 8-15% of the primary energy demand in the European Union by the year 2010. Even renewable energy systems (RES) with an economic potential are only partly exploited. The FIRE research project financed partly in the JOULE program analyses and compares the means of financing RES in Austria, Denmark, Germany, the Netherlands, Spain, Sweden and the United Kingdom to put forward best practice recommendations so that renewable energy depolyments will occur at a faster rate. FIRE addresses to politicians, to potential investors and to project-developers. (orig./RHM)

  14. Long-Term Evaluation of SSL Field Performance in Select Interior Projects

    Energy Technology Data Exchange (ETDEWEB)

    Perrin, Tess E. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Davis, Robert G. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Wilkerson, Andrea M. [Pacific Northwest National Lab. (PNNL), Richland, WA (United States)

    2017-02-28

    This GATEWAY project evaluated four field installations to better understand the long-term performance of a number of LED products, which can hopefully stimulate improvements in designing, manufacturing, specifying, procuring, and installing LED products. Field studies provide the opportunity to discover and investigate issues that cannot be simulated or uncovered in a laboratory, but the installed performance over time of commercially available LED products has not been well documented. Improving long-term performance can provide both direct energy savings by reducing the need to over-light to account for light loss and indirect energy savings through better market penetration due to SSL’s competitive advantages over less-efficient light source technologies. The projects evaluated for this report illustrate that SSL use is often motivated by advantages other than energy savings, including maintenance savings, easier integration with control systems, and improved lighting quality.

  15. A Case Study on the Selection of Purification Project of Lake

    Directory of Open Access Journals (Sweden)

    Shen Shilong

    2015-01-01

    Full Text Available This paper will mainly talk about best scheme for the water purification project of the Lake. The engineering used the water diversion metabolism method to purify the water. If the lake area and the water volume are small, the metabolic cycle is relatively short; if the lake area and the water volume are large, the metabolic cycle is relatively long. Simultaneously, the larger the water flow is, the shorter the metabolic cycle period is and the higher the average metabolic rate is. The process of the water metabolism is in agreement with the direction of the water flow movement. With the gradual metabolism of water, different water bodies begin to dilute and diffuse. The engineers will choose the most appropriate water division project according to different water division volumes and water division routes.

  16. Mitigation of Selected Hanford Site Manhattan Project and Cold War Era Artifacts

    Energy Technology Data Exchange (ETDEWEB)

    Kennedy, Ellen P.; Harvey, David W.

    2006-09-08

    This document is the first time that Manhattan Project and Cold War era artifacts from the Hanford Site have been assembled within a publication. The publication presents photographic and written documentation of a number of Manhattan Project and Cold War era artifacts that were identified and tagged during assessment walk throughs of historic buildings on the Hanford Site but which could not be curated within the Hanford collection because they were too large for long-term storage and/or exhibit purposes or were radiologically contaminated. The significance of the artifacts in this publication and a proposed future appendix is based not on the individual significance of any single artifact but on their collective contribution to the science and engineering of creating plutonium and advancing nuclear technology in nuclear fuel and power.

  17. Distributed Physical and Molecular Separations for Selective Harvest of Higher Value Wheat Straw Components Project

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    2004-09-30

    Wheat straw (Triticum aestivum L.) is an abundant source of plant fiber. It is regenerated, in large quantities, every year. At present, this potentially valuable resource is greatly under-exploited. Most of the excess straw biomass (i.e., tonnage above that required for agronomic cropping system sustainability) is managed through expensive chopping/tillage operations and/or burnt in the field following harvest, resulting in air pollution and associated health problems. Potential applications for wheat straw investigated within this project include energy and composites manufacture. Other methods of straw utilization that will potentially benefit from the findings of this research project include housing and building, pulp and paper, thermal insulation, fuels, and chemicals. This project focused on components of the feedstock assembly system for supplying a higher value small grains straw residue for (1) gasification/combustion and (2) straw-thermoplastic composites. This project was an integrated effort to solve the technological, infrastructural, and economic challenges associated with using straw residue for these bioenergy and bioproducts applications. The objective of the research is to contribute to the development of a low-capital distributed harvesting and engineered storage system for upgrading wheat straw to more desirable feedstocks for combustion and for straw-plastic composites. They investigated two processes for upgrading wheat straw to a more desirable feedstock: (1) an efficient combine-based threshing system for separating the intermodal stems from the leaves, sheaths, nodes, and chaff. (2) An inexpensive biological process using white-rot fungi to improve the composition of the mechanically processed straw stems.

  18. Distributed Physical and Molecular Separations for Selective Harvest of Higher Value Wheat Straw Components Project

    Energy Technology Data Exchange (ETDEWEB)

    Hess, J.R

    2005-01-31

    Wheat straw (Triticum aestivum L.) is an abundant source of plant fiber. It is regenerated, in large quantities, every year. At present, this potentially valuable resource is greatly under-exploited. Most of the excess straw biomass (i.e., tonnage above that required for agronomic cropping system sustainability) is managed through expensive chopping/tillage operations and/or burnt in the field following harvest, resulting in air pollution and associated health problems. Potential applications for wheat straw investigated within this project include energy and composites manufacture. Other methods of straw utilization that will potentially benefit from the findings of this research project include housing and building, pulp and paper, thermal insulation, fuels, and chemicals. This project focused on components of the feedstock assembly system for supplying a higher value small grains straw residue for (1) gasification/combustion and (2) straw-thermoplastic composites. This project was an integrated effort to solve the technological, infrastructural, and economic challenges associated with using straw residue for these bioenergy and bioproducts applications. The objective of the research is to contribute to the development of a low-capital distributed harvesting and engineered storage system for upgrading wheat straw to more desirable feedstocks for combustion and for straw-plastic composites. We investigated two processes for upgrading wheat straw to a more desirable feedstock: (1) An efficient combine-based threshing system for separating the internodal stems from the leaves, sheaths, nodes, and chaff. (2) An inexpensive biological process using white-rot fungi to improve the composition of the mechanically processed straw stems.

  19. Estimating NOA Health Risks from Selected Construction Activities at the Calaveras Dam Replacement Project (CDRP)

    Science.gov (United States)

    Hernandez, D. W.

    2012-12-01

    The CDRP is a major construction project involving up to 400 workers using heavy earth moving equipment, blasting, drilling, rock crushing, and other techniques designed to move 7 million yards of earth. Much of this material is composed of serpentinite, blueschist, and other rocks that contain chrysotile, crocidolite, actinolite, tremolite, and Libby-class amphiboles. To date, over 1,000 personal, work area, and emission inventory related samples have been collected and analyzed by NIOSH 7400, NIOSH 7402, and CARB-AHERA methodology. Data indicate that various CDRP construction activities have the potential to generate significant mineral fibers and structures that could represent elevated on site and off site health risks. This presentation will review the Contractors air monitoring program for this major project, followed by a discussion of predictive methods to evaluate potential onsite and offsite risks. Ultimately, the data are used for planning control strategies designed to achieve a Project Action Level of 0.01 f/cc (one tenth the Cal/OSHA PEL) and risk-based offsite target levels.

  20. A tool to assess sex-gender when selecting health research projects.

    Science.gov (United States)

    Tomás, Concepción; Yago, Teresa; Eguiluz, Mercedes; Samitier, M A Luisa; Oliveros, Teresa; Palacios, Gemma

    2015-04-01

    To validate the questionnaire "Gender Perspective in Health Research" (GPIHR) to assess the inclusion of gender perspective in research projects. Validation study in two stages. Feasibility was analysed in the first, and reliability, internal consistence and validity in the second. Aragón Institute of Health Science, Aragón, Spain. GPIHR was applied to 118 research projects funded in national and international competitive tenders from 2003 to 2012. Analysis of inter- and intra-observer reliability with Kappa index and internal consistency with Cronbach's alpha. Content validity analysed through literature review and construct validity with an exploratory factor analysis. Validated GPIHR has 10 questions: 3 in the introduction, 1 for objectives, 3 for methodology and 3 for research purpose. Average time of application was 13min Inter-observer reliability (Kappa) varied between 0.35 and 0.94 and intra-observer between 0.40 and 0.94. Theoretical construct is supported in the literature. Factor analysis identifies three levels of GP inclusion: "difference by sex", "gender sensitive" and "feminist research" with an internal consistency of 0.64, 0.87 and 0.81, respectively, which explain 74.78% of variance. GPIHR questionnaire is a valid tool to assess GP and useful for those researchers who would like to include GP in their projects. Copyright © 2014 Elsevier España, S.L.U. All rights reserved.

  1. The development and projection of exports of selected agricultural and alimentary commodities from the Czech Republic

    Directory of Open Access Journals (Sweden)

    Jana Stávková

    2004-01-01

    Full Text Available This contribution presents partial results of a statistical analysis of export indicators of selected agricultural and alimentary categories of products from the Czech Republic according to countries in a reference period 1993−2002. The analysis includes short-run prediction based on applied modes of developmental tendencies of assessed phenomena.

  2. A Cognitive Model of Document Use during a Research Project. Study I. Document Selection.

    Science.gov (United States)

    Wang, Peiling; Soergel, Dagobert

    1998-01-01

    Proposes a model of document selection by real users of a bibliographic retrieval system. Reports on Part I of a longitudinal study of decision making on document use by academics (25 faculty and graduate students in Agricultural Economics). Examines what components are relevant to the users' decisions and what cognitive process may have occurred…

  3. Basic Research on Selecting ISDC Activity for Decommissioning Costing in KRR-2 Decommissioning Project Experience Data

    Energy Technology Data Exchange (ETDEWEB)

    Song, Chan-Ho; Park, Hee-Seong; Jin, Hyung-Gon; Park, Seung-Kook [Korea Atomic Energy Research Institute, Daejeon (Korea, Republic of)

    2015-10-15

    KAERI is performing research for calculation of expected time of a decommissioning work and evaluation of decommissioning cost and this research calculate a decommissioning work unit productivity based on the experience data of decommissioning activity for KRR-2. The KAERI be used to calculate the decommissioning cost and manage the experience data from the decommissioning activity through the Decommissioning Information Management System (DECOMMIS), Decommissioning Facility Characterization DB System (DEFACS), and Decommissioning Work-unit Productivity Calculation System (DEWOCS). In this paper, the methodology was presented how select the ISDC activities in dismantling work procedures of a 'removal of radioactive concrete'. The reason to select the 'removal of radioactive concrete' is main key activity and generates the amount of radioactive waste. This data will take advantage of the cost estimation after the code for the selected items derived ISDC. There are various efforts for decommissioning costing in each country. In particular, OECD/NEA recommends decommissioning cost estimation using the ISDC and IAEA provides for Cost Estimation for Research Reactors in Excel (CERREX) program that anyone is easy to use the cost evaluation from a limited decommissioning experience in domestic. In the future, for the decommissioning cost evaluation, the ISDC will be used more widely in a strong position. This paper has described a method for selecting the ISDC item from the actual dismantling work procedures.

  4. 24 CFR 570.209 - Guidelines for evaluating and selecting economic development projects.

    Science.gov (United States)

    2010-04-01

    ..., where the recreational benefit to users or members clearly outweighs employment or other benefits to low... DEVELOPMENT BLOCK GRANTS Eligible Activities § 570.209 Guidelines for evaluating and selecting economic... activities to be carried out for economic development purposes. Specifically, these guidelines are applicable...

  5. A modification of the successive projections algorithm for spectral variable selection in the presence of unknown interferents.

    Science.gov (United States)

    Soares, Sófacles Figueredo Carreiro; Galvão, Roberto Kawakami Harrop; Araújo, Mário César Ugulino; da Silva, Edvan Cirino; Pereira, Claudete Fernandes; de Andrade, Stéfani Iury Evangelista; Leite, Flaviano Carvalho

    2011-03-09

    This work proposes a modification to the successive projections algorithm (SPA) aimed at selecting spectral variables for multiple linear regression (MLR) in the presence of unknown interferents not included in the calibration data set. The modified algorithm favours the selection of variables in which the effect of the interferent is less pronounced. The proposed procedure can be regarded as an adaptive modelling technique, because the spectral features of the samples to be analyzed are considered in the variable selection process. The advantages of this new approach are demonstrated in two analytical problems, namely (1) ultraviolet-visible spectrometric determination of tartrazine, allure red and sunset yellow in aqueous solutions under the interference of erythrosine, and (2) near-infrared spectrometric determination of ethanol in gasoline under the interference of toluene. In these case studies, the performance of conventional MLR-SPA models is substantially degraded by the presence of the interferent. This problem is circumvented by applying the proposed Adaptive MLR-SPA approach, which results in prediction errors smaller than those obtained by three other multivariate calibration techniques, namely stepwise regression, full-spectrum partial-least-squares (PLS) and PLS with variables selected by a genetic algorithm. An inspection of the variable selection results reveals that the Adaptive approach successfully avoids spectral regions in which the interference is more intense. Copyright © 2011 Elsevier B.V. All rights reserved.

  6. The selective neurotoxin DSP-4 impairs the noradrenergic projections from the locus coeruleus to the inferior colliculus in rats.

    Directory of Open Access Journals (Sweden)

    Sebastián eHormigo

    2012-06-01

    Full Text Available The inferior colliculus (IC and the locus coeruleus (LC are two midbrain nuclei that integrate multimodal information and play a major role in novelty detection to elicit an orienting response. Despite the reciprocal connections between these two structures, the projection pattern and target areas of the LC within the subdivisions of the rat IC are still unknown. Here, we used tract-tracing approaches combined with immunohistochemistry, densitometry and confocal microscopy analysis to describe a projection from the LC to the IC. Biotinylated dextran amine (BDA injections into the LC showed that the LC-IC projection is mainly ipsilateral (90% and reaches, to a major extent, the dorsal and lateral part of the IC and the intercollicular commissure. Additionally, some LC fibers extend into the central nucleus of the IC. The neurochemical nature of this projection is noradrenergic, given that tyrosine hydroxylase (TH and dopamine beta hydroxylase (DBH colocalize with the BDA-labeled fibers from the LC. To determine the total field of the LC innervations in the IC, we destroyed the LC neurons and fibers using a highly selective neurotoxin, DSP-4, and then studied the distribution and density of TH- and DBH-immunolabeled axons in the IC. In the DSP-4 treated animals, the number of axonal fibers immunolabeled for TH and DBH were deeply decreased throughout the entire rostrocaudal extent of the IC and its subdivisions compared to controls. Our densitometry results showed that the IC receives up to 97% of its noradrenergic innervations from the LC neurons and only 3% from non-coeruleus neurons. Our results also indicate that TH immunoreactivity in the IC was less impaired than the immunoreactivity for DBH after DSP-4 administration. This is consistent with the existence of an important dopaminergic projection from the substantia nigra to the IC. In conclusion, our study demonstrates and quantifies the noradrenergic projection from the LC to the IC and its

  7. Student nurse selection and predictability of academic success: The Multiple Mini Interview project.

    Science.gov (United States)

    Gale, Julia; Ooms, Ann; Grant, Robert; Paget, Kris; Marks-Maran, Di

    2016-05-01

    With recent reports of public enquiries into failure to care, universities are under pressure to ensure that candidates selected for undergraduate nursing programmes demonstrate academic potential as well as characteristics and values such as compassion, empathy and integrity. The Multiple Mini Interview (MMI) was used in one university as a way of ensuring that candidates had the appropriate numeracy and literacy skills as well as a range of communication, empathy, decision-making and problem-solving skills as well as ethical insights and integrity, initiative and team-work. To ascertain whether there is evidence of bias in MMIs (gender, age, nationality and location of secondary education) and to determine the extent to which the MMI is predictive of academic success in nursing. A longitudinal retrospective analysis of student demographics, MMI data and the assessment marks for years 1, 2 and 3. One university in southwest London. One cohort of students who commenced their programme in September 2011, including students in all four fields of nursing (adult, child, mental health and learning disability). Inferential statistics and a Bayesian Multilevel Model. MMI in conjunction with MMI numeracy test and MMI literacy test shows little or no bias in terms of ages, gender, nationality or location of secondary school education. Although MMI in conjunction with numeracy and literacy testing is predictive of academic success, it is only weakly predictive. The MMI used in conjunction with literacy and numeracy testing appears to be a successful technique for selecting candidates for nursing. However, other selection methods such as psychological profiling or testing of emotional intelligence may add to the extent to which selection methods are predictive of academic success on nursing. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. Columbia River : Select Area Fishery Evaluation project : 1995-96 Annual Reports.

    Energy Technology Data Exchange (ETDEWEB)

    Hirose, Paul; Miller, Marc; Hill, Jim

    1998-06-01

    Water quality monitoring was conducted from November 1994 through October 1996 at five Oregon and three Washington select area study sites in the lower Columbia River. Physicochemical monitoring and aquatic biomonitoring programs were established to profile baseline parameters at each study site and document differences between study sites. Data collected at study sites where fish rearing operations were initiated indicate a potential negative impact on the surrounding benthic invertebrate communities.

  9. Project portfolio selection of banking services using COPRAS and Fuzzy-TOPSIS

    Directory of Open Access Journals (Sweden)

    C.O. Anyaeche

    2017-04-01

    Full Text Available Portfolio selection is a business process which has helped organisations identify an area of com-petitive advantage and it is a major concern to industrial players in the banking sectors. In order to enhance bank portfolio selection, cost, profitability, time and location are important parameters that decision-makers often consider. This study implements a fuzzy-TOPSIS (Technique for Or-der Preference by Similarity to Ideal Solution framework to evaluate three potential portfolios (automated teller machine gallery, quick service point and branch for a bank using the infor-mation from three decision-makers. An illustrative example of real bank information is used to demonstrate the proposed framework applicability. The complex proportional assessment of al-ternatives (COPRAS method is also used as an evaluation technique and the results are com-pared, which yields that the results from the ranking order of fuzzy-TOPSIS and COPRAS were different. However, there is a consistency between the aggregation of intuition-based, fuzzy-TOPSIS and COPRAS ranks and fuzzy-TOPSIS ranking results. The presented framework is an easy-to-apply tool that improves portfolio selection decision in the banking system.

  10. Selected power reactor projects in Canada and the United States of America

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1964-11-01

    As part of its activities in connection with the development of nuclear power, the IAEA has undertaken a continuing study of the technology and economics of power reactors, with particular reference to the needs of the developing countries. Information on the progress made in eight power reactor projects, namely those of Bonus, Pathfinder, Elk River, Piqua, Hallam, Experimental Gas-Cooled Reactor (EGCR), High-Temperature Gas-Cooled Reactor (HTGCR) and Nuclear Power Demonstration (NPD), is presented in this report. Developments during the past year are shown, emphasis being placed on operating experience in the case of those reactors which have become critical. The Agency is grateful to the Governments of Canada and the USA, who have extended the necessary facilities for covering he different power reactor projects in their respective countries. The cooperation received from the reactor manufacturers, builders and operators is also gratefully acknowledged. It is hoped that this report will be of interest to reactor technologists and operators and those interested in the application of nuclear power.

  11. Selected power reactor projects in Canada and the United States of America

    International Nuclear Information System (INIS)

    1964-01-01

    As part of its activities in connection with the development of nuclear power, the IAEA has undertaken a continuing study of the technology and economics of power reactors, with particular reference to the needs of the developing countries. Information on the progress made in eight power reactor projects, namely those of Bonus, Pathfinder, Elk River, Piqua, Hallam, Experimental Gas-Cooled Reactor (EGCR), High-Temperature Gas-Cooled Reactor (HTGCR) and Nuclear Power Demonstration (NPD), is presented in this report. Developments during the past year are shown, emphasis being placed on operating experience in the case of those reactors which have become critical. The Agency is grateful to the Governments of Canada and the USA, who have extended the necessary facilities for covering he different power reactor projects in their respective countries. The cooperation received from the reactor manufacturers, builders and operators is also gratefully acknowledged. It is hoped that this report will be of interest to reactor technologists and operators and those interested in the application of nuclear power

  12. Plutonium Immobilization Project - Can-In-Canister Hardware Development/Selection

    International Nuclear Information System (INIS)

    Hamilton, L.

    2001-01-01

    The Plutonium Immobilization Project (PIP) is a program funded by the U.S. Department of Energy to develop technology to disposition excess weapons grade plutonium. This program introduces the ''Can-in-Canister'' (CIC) technology that immobilizes the plutonium by encapsulating it in ceramic forms (or pucks) and ultimately surrounding it with high-level waste glass to provide a deterrent to recovery. Since there are significant radiation, contamination and security concerns, the project team is developing unique technologies to remotely perform plutonium immobilization tasks. This paper covers the design, development and testing of the magazines (cylinders containing cans of ceramic pucks) and the rack that holds them in place inside the waste glass canister. Several magazine and rack concepts were evaluated to produce a design that gives the optimal balance between resistance to thermal degradation and facilitation of remote handling. This paper also reviews the effort to develop a jointed arm robot that can remotely load seven magazines into defined locations inside a stationary canister working only through the 4 inch (102 mm) diameter canister throat

  13. Plutonium Immobilization Project - Can-In-Canister Hardware Development/Selection

    International Nuclear Information System (INIS)

    Hamilton, L.

    2001-01-01

    The Plutonium Immobilization Project (PIP) is a program funded by the U.S. Department of Energy to develop technology to disposition excess weapons grade plutonium. This program introduces the ''Can-in-Canister'' (CIC) technology that immobilizes the plutonium by encapsulating it in ceramic forms (or pucks) and ultimately surrounding it with high-level waste glass to provide a deterrent to recovery. Since there are significant radiation, contamination and security concerns, the project team is developing unique technologies to remotely perform plutonium immobilization tasks. This paper covers the design, development and testing of the magazines (cylinders containing cans of ceramic pucks) and the rack that holds them in place inside the waste glass canister. Several magazine and rack concepts were evaluated to produce a design that gives the optimal balance between resistance to thermal degradation and facilitation of remote handling. This paper also reviews the effort to develop a join ted arm robot that can remotely load seven magazines into defined locations inside a stationary canister working only through the 4 inch (102 mm) diameter canister throat

  14. Developing an environmental compliance program for accelerator production of tritium

    International Nuclear Information System (INIS)

    Reynolds, R.W.; Roberts, J.S.; Dyer, K.W.; Shedrow, C.B.; Sheetz, S.O.; England, J.L.

    1998-01-01

    This paper addresses the development of an environmental program for a large proposed federal project currently in the preliminary design phase, namely, the accelerator production of tritium (APT) for the US Department of Energy (DOE). This project is complicated not only by its size ($3.5 to $4.5 billion) but also by its technical complexity and one-of-a-kind nature. This is further complicated by the fact that government projects are driven by budgets subject to public pressures and annual Congressional fiscal considerations, whereas private companies are driven by profits. The measure of success for a federal project such as the APT is based on level of public support, not profits. Finally, there are not too many equivalent environmental programs that could be used as models, and benchmarking is nearly impossible. Forming an environmental program during the conceptual design phase of this large federal project included the formation of a core environmental working group (EWG). The group has membership from all major project organizations with a charter formally recognized by the project director. The envelope for traditional environmental work for the APT project has been stretched to include teaming with management in the establishment of project goals and direction. The APT EWG was set up organizationally to include several subgroups or teams that do the real work of assessing, establishing the regulatory framework, and then developing a compliance program. Setting aside the organizational difficulties of selecting the right team leads and members, each team was tasked with developing a charter, plan, and schedule. Since then, each team has developed an appropriate level of supporting documentation to address its particular issues and requirements

  15. Space Telecommunications Radio System (STRS) Compliance Testing

    Science.gov (United States)

    Handler, Louis M.

    2011-01-01

    The Space Telecommunications Radio System (STRS) defines an open architecture for software defined radios. This document describes the testing methodology to aid in determining the degree of compliance to the STRS architecture. Non-compliances are reported to the software and hardware developers as well as the NASA project manager so that any non-compliances may be fixed or waivers issued. Since the software developers may be divided into those that provide the operating environment including the operating system and STRS infrastructure (OE) and those that supply the waveform applications, the tests are divided accordingly. The static tests are also divided by the availability of an automated tool that determines whether the source code and configuration files contain the appropriate items. Thus, there are six separate step-by-step test procedures described as well as the corresponding requirements that they test. The six types of STRS compliance tests are: STRS application automated testing, STRS infrastructure automated testing, STRS infrastructure testing by compiling WFCCN with the infrastructure, STRS configuration file testing, STRS application manual code testing, and STRS infrastructure manual code testing. Examples of the input and output of the scripts are shown in the appendices as well as more specific information about what to configure and test in WFCCN for non-compliance. In addition, each STRS requirement is listed and the type of testing briefly described. Attached is also a set of guidelines on what to look for in addition to the requirements to aid in the document review process.

  16. Ecological Monitoring and Compliance Program Fiscal Year 2002 Report

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Wills

    2002-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species and important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species

  17. Multi-criteria decision-making in the selection of a renewable energy project in spain: The Vikor method

    International Nuclear Information System (INIS)

    San Cristobal, J.R.

    2011-01-01

    One of the characteristics of the Spanish energy system is its high degree of dependence on imports. In 2005, the Spanish government approved the new Renewable Energy Plan in the following sectors: Windpower, Hydroelectric, Solar Thermal, Solar Thermo-electric, Photovoltaic, Biomass, Biogas and Biofuels. The aim of the Plan is to make it possible to reach the target of 12% of primary energy being met from renewable sources by 2010. When selecting one from various Renewable Energy investment projects different groups of decision-makers become involved in the process. Decision-making has to take into consideration several conflicting objectives because of the increasingly complex social, economic, technological, and environmental factors that are present. Traditional single-criterion decision-making is no longer able to handle these problems. The Compromise Ranking method, also known as the VIKOR method, introduces the Multi-criteria ranking index based on the particular measure of ''closeness'' to the ''ideal'' solution. In this paper, we apply the method in the selection of a Renewable Energy project corresponding to the Renewable Energy Plan launched by the Spanish Government. The method is combined with the Analytical Hierarchy Process method for weighting the importance of the different criteria, which allows decision-makers to assign these values based on their preferences. The results show that the Biomass plant option (Co-combustion in a conventional power plant) is the best choice, followed by the Wind power and Solar Thermo-electric alternatives. (author)

  18. The ENTRIA project. Selected disciplinary and interdisciplinary research topics; Das ENTRIA-Projekt. Ausgewaehlte disziplinaere und interdisziplinaere Forschungsthemen

    Energy Technology Data Exchange (ETDEWEB)

    Roehlig, Klaus-Juergen [Technical Univ. Clausthal, Clausthal-Zellerfeld (Germany); Hocke, Peter [KIT Karlsruhe (Germany). Inst. for Technology Assessment and Systems Analysis; Smeddinck, Ulrich [Braunschweig Technical Univ. Braunschweig (Germany); Walther, Clemens [Hannover Univ. (Germany). Inst. for Radioecology and Radiation Protection

    2015-07-01

    ENTRIA (''Disposal Options for Radioactive Residues: Interdisciplinary Analyses and Development of Evaluation Principles'', www.entria.de) is a joint research project carried out by twelve departments and institutes from German universities and major research institutions and one partner from Switzerland. It is financed by the German Ministry of Education and Research (BMBF). Scientists representing natural sciences, civil engineering, philosophy, law, social and political sciences, and technology assessment carry out disciplinary and interdisciplinary research addressing three options to manage especially high-level radioactive waste: - Final disposal in deep geological formations without any arrangements for retrieval, - disposal in deep geological formations with arrangements for monitoring and retrieval, and - (prolonged) surface (or near-surface) storage. In the paper, the following selected research topics - both disciplinary and interdisciplinary - are briefly introduced in order to provide an impression of the project scope: - Surface storage, - reference concepts for emplacement in deep geological formations with retrievability and monitoring, - radiation exposure and justification of measures, - interdisciplinary perspectives on dose limits, - comparative studies on nuclear waste governance, - nuclear waste governance in Switzerland, - public involvement and the German Site Selection Act, and - citizens' jury.

  19. A Decision Support Concept for a construction design projectselecting the type of glass façade

    Directory of Open Access Journals (Sweden)

    Franjo Šimić

    2017-01-01

    Full Text Available The paper describes research into the possibility of developing a concept for supporting decisions in planning construction projects (one of the most important stages of construction project management. The focus is on supporting decisions in selecting the type of and solution for the glass façade in the main design. Materials and types of soluteons for a glass façade were analyzed and alternative solutions were obtained. The concept was developed in that it included relevant stakeholders in the decision-making process during the construction design. These stakeholders were the investor, architect, and construction contractor. The analysis was carried out and a hierarchical structure of objectives was formed as a goal tree. The criteria at the last hierarchical level were used to evaluate alternative solutions for the glass façade, and their weights were determined by all stakeholders using the AHP method (Analytic Hierarchy Process. Using PROMETHEE (Preference Ranking Method for Enrichment Evaluation, a comparison of alternative solutions for the glass façade was conducted and the alternatives were ranked according to the priorities for inclusion into the main design. The concept was tested by selecting a type of glass façade on a residential-commercial building in the city of Rijeka, Croatia.

  20. Latent Dirichlet Allocation (LDA) Model and kNN Algorithm to Classify Research Project Selection

    Science.gov (United States)

    Safi’ie, M. A.; Utami, E.; Fatta, H. A.

    2018-03-01

    Universitas Sebelas Maret has a teaching staff more than 1500 people, and one of its tasks is to carry out research. In the other side, the funding support for research and service is limited, so there is need to be evaluated to determine the Research proposal submission and devotion on society (P2M). At the selection stage, research proposal documents are collected as unstructured data and the data stored is very large. To extract information contained in the documents therein required text mining technology. This technology applied to gain knowledge to the documents by automating the information extraction. In this articles we use Latent Dirichlet Allocation (LDA) to the documents as a model in feature extraction process, to get terms that represent its documents. Hereafter we use k-Nearest Neighbour (kNN) algorithm to classify the documents based on its terms.

  1. Compliance with physical exercise

    DEFF Research Database (Denmark)

    Gram, Anne Sofie; Bønnelycke, Julie; Rosenkilde Larsen, Mads

    2014-01-01

    Aims: Sixty-one healthy, sedentary, moderately overweight young men participated in a randomised controlled trial to examine the effects of two different doses of endurance exercise on health behaviour and exercise compliance. Methods: Participants were randomised to a sedentary control group......), a post hoc thematic analysis was conducted to connect qualitative and quantitative data in a joint analysis. Results: Of the subjects interviewed, exercise compliance expressed as 95% CI was [96.8; 103%] in the MOD group and [82.9; 99.6%] in the HIGH group. The different doses of daily exercise equally...... or quantitative methodology alone. The preconditions of the TBP were fulfilled, and it represents a methodological model to explain the high degree of compliance and motivation to exercise....

  2. Flood control project selection using an interval type-2 entropy weight with interval type-2 fuzzy TOPSIS

    Science.gov (United States)

    Zamri, Nurnadiah; Abdullah, Lazim

    2014-06-01

    Flood control project is a complex issue which takes economic, social, environment and technical attributes into account. Selection of the best flood control project requires the consideration of conflicting quantitative and qualitative evaluation criteria. When decision-makers' judgment are under uncertainty, it is relatively difficult for them to provide exact numerical values. The interval type-2 fuzzy set (IT2FS) is a strong tool which can deal with the uncertainty case of subjective, incomplete, and vague information. Besides, it helps to solve for some situations where the information about criteria weights for alternatives is completely unknown. Therefore, this paper is adopted the information interval type-2 entropy concept into the weighting process of interval type-2 fuzzy TOPSIS. This entropy weight is believed can effectively balance the influence of uncertainty factors in evaluating attribute. Then, a modified ranking value is proposed in line with the interval type-2 entropy weight. Quantitative and qualitative factors that normally linked with flood control project are considered for ranking. Data in form of interval type-2 linguistic variables were collected from three authorised personnel of three Malaysian Government agencies. Study is considered for the whole of Malaysia. From the analysis, it shows that diversion scheme yielded the highest closeness coefficient at 0.4807. A ranking can be drawn using the magnitude of closeness coefficient. It was indicated that the diversion scheme recorded the first rank among five causes.

  3. Flood management selections for the Yangtze River midstream after the Three Gorges Project operation

    Science.gov (United States)

    Fang, Hongwei; Han, Dong; He, Guojian; Chen, Minghong

    2012-04-01

    SummaryAfter the Yangtze River was closed by the Three Gorges Project (TGP) in 2003, erosion occurred from the dam site to the river mouth, especially in the middle and lower reaches of the Yangtze River. However, in some local areas of Chenglingji reach which holds the key position for flood management, there is actually deposition in contrast to the expected erosion. In this paper, a one dimensional mathematical model of the river network with sediment transport is used as the tool to simulate flow and fluvial processes. The calculation domain is from Yichang, which is downstream of the dam, to Hankou, the controlling node of flood management, 694 km long in total. The model is calibrated based on the field data of hydrology and sediment transport during the period from October 2003 to October 2008. Then the model is utilized to simulate the erosion and deposition of the middle and lower reaches of the Yangtze River in the next two decades, and produce the results of a new river channel after river bed deformation occurs. The typical flood processes of 1954 and 1998 in the Yangtze River basin are used to check the flood management scheme for the research area, and results show that water storage of Three Gorges Reservoir (TGR) and a flood diversion program downstream of the Yangtze River should be taken into consideration.

  4. Compilation of selected deep-sea biological data for the US subseabed disposal project

    International Nuclear Information System (INIS)

    Gomez, L.S.; Marietta, M.G.; Jackson, D.W.

    1987-03-01

    The US Subseabed Disposal Project (SDP) has compiled an extensive deep-sea biological data base to be used in calculating biological parameters of state and rate included in mathematical models of oceanographic transport of radionuclides. The data base is organized around a model deep-sea ecosystem which includes the following components: zooplankton, fish and other nekton, invertebrate benthic megafauna, benthic macrofauna, benthic meiofauna, heterotrophic microbiota, as well as suspended and sediment particulate organic carbon. Measurements of abundance and activity rates (e.g., respiration, production, sedimentation, etc.) reported in the international oceanographic literature are summarized in 23 tables. Included in these tables are the latitudinal position of the studies, as well as information describing sampling techniques and any special notes needed to better assess the data presented. This report has been prepared primarily as a resource document to be used in calculating parameter values for various modeling applications, and for preparing historical data reviews for other SDP reports. Depending on the intended use, these data will require further reduction and unit conversion

  5. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    Energy Technology Data Exchange (ETDEWEB)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C. (Brookhaven National Lab., Upton, NY (United States)); Anspaugh, L.; Layton, D. (Lawrence Livermore National Lab., CA (United States))

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated.

  6. Quantifying Projected Heat Mortality Impacts under 21st-Century Warming Conditions for Selected European Countries.

    Science.gov (United States)

    Kendrovski, Vladimir; Baccini, Michela; Martinez, Gerardo Sanchez; Wolf, Tanja; Paunovic, Elizabet; Menne, Bettina

    2017-07-05

    Under future warming conditions, high ambient temperatures will have a significant impact on population health in Europe. The aim of this paper is to quantify the possible future impact of heat on population mortality in European countries, under different climate change scenarios. We combined the heat-mortality function estimated from historical data with meteorological projections for the future time laps 2035-2064 and 2071-2099, developed under the Representative Concentration Pathways (RCP) 4.5 and 8.5. We calculated attributable deaths (AD) at the country level. Overall, the expected impacts will be much larger than the impacts we would observe if apparent temperatures would remain in the future at the observed historical levels. During the period 2071-2099, an overall excess of 46,690 and 117,333 AD per year is expected under the RCP 4.5 and RCP 8.5 scenarios respectively, in addition to the 16,303 AD estimated under the historical scenario. Mediterranean and Eastern European countries will be the most affected by heat, but a non-negligible impact will be still registered in North-continental countries. Policies and plans for heat mitigation and adaptation are needed and urgent in European countries in order to prevent the expected increase of heat-related deaths in the coming decades.

  7. Pilot study risk assessment for selected problems at the Fernald Environmental Management Project (FEMP)

    International Nuclear Information System (INIS)

    Hamilton, L.D.; Meinhold, A.F.; Baxter, S.L.; Holtzman, S.; Morris, S.C.; Pardi, R.; Rowe, M.D.; Sun, C.; Anspaugh, L.; Layton, D.

    1993-03-01

    Two important environmental problems at the USDOE Fernald Environmental Management Project (FEMP) facility in Fernald, Ohio were studied in this human health risk assessment. The problems studied were radon emissions from the K-65 waste silos, and offsite contamination of ground water with uranium. Waste from the processing of pitchblende ore is stored in the K-65 silos at the FEMP. Radium-226 in the waste decays to radon gas which escapes to the outside atmosphere. The concern is for an increase in lung cancer risk for nearby residents associated with radon exposure. Monitoring data and a gaussian plume transport model were used to develop a source term and predict exposure and risk to fenceline residents, residents within 1 and 5 miles of the silos, and residents of Hamilton and Cincinnati, Ohio. Two release scenarios were studied: the routine release of radon from the silos and an accidental loss of one silo dome integrity. Exposure parameters and risk factors were described as distributions. Risks associated with natural background radon concentrations were also estimated

  8. Opening the research agenda for selection of hot spots for human biomonitoring research in Belgium: a participatory research project

    Directory of Open Access Journals (Sweden)

    Chovanova Hana

    2010-07-01

    Full Text Available Abstract Background In order to select priority hotspots for environment and health research in Flanders (Belgium, an open procedure was organized. Environment and health hotspots are strong polluting point sources with possible health effects for residents living in the vicinity of the hot spot. The selection procedure was part of the work of the Flemish Centre of Expertise for Environment and Health, which investigates the relation between environmental pollution and human health. The project is funded and steered by the Flemish government. Methods The involvement of other actors than merely experts is inspired by the 'analytical-deliberative' approach of the National Research Council in the United States and the extended peer community approach. These approaches stress the importance of involving different expert- and social perspectives in order to increase the knowledge base on complex issues. In the procedure used in the project a combination of expert and stakeholder input was essential. The final decision was supported by a multi-criteria analysis of expert assessment and stakeholder advice. Results The endeavour was challenging from the start because of the complicated ambition of including a diversity of actors, potential hotspots, concerns and assessment criteria, but nevertheless the procedure proved its value in both structuring and informing the decision-making process. Moreover the process gained the support of most actors participating in the process, even though the final selection could not satisfy all preferences. Conclusions Opening the research agenda exemplifies the value of inter- and transdisciplinary cooperation as well as the need for a well-structured and negotiated procedure that combines relevant factors and actors with pragmatism. The value of such a process also needs to prove itself in practice after the procedure has been completed: the tension between an ambition of openness on the one hand and a more closed

  9. Mobile Source Emissions Regulatory Compliance Data Inventory

    Science.gov (United States)

    The Mobile Source Emissions Regulatory Compliance Data Inventory data asset contains measured summary compliance information on light-duty, heavy-duty, and non-road engine manufacturers by model, as well as fee payment data required by Title II of the 1990 Amendments to the Clean Air Act, to certify engines for sale in the U.S. and collect compliance certification fees. Data submitted by manufacturers falls into 12 industries: Heavy Duty Compression Ignition, Marine Spark Ignition, Heavy Duty Spark Ignition, Marine Compression Ignition, Snowmobile, Motorcycle & ATV, Non-Road Compression Ignition, Non-Road Small Spark Ignition, Light-Duty, Evaporative Components, Non-Road Large Spark Ignition, and Locomotive. Title II also requires the collection of fees from manufacturers submitting for compliance certification. Manufacturers submit data on an annual basis, to document engine model changes for certification. Manufacturers also submit compliance information on already certified in-use vehicles randomly selected by the EPA (1) year into their life and (4) years into their life to ensure that emissions systems continue to function appropriately over time.The EPA performs targeted confirmatory tests on approximately 15% of vehicles submitted for certification. Confirmatory data on engines is associated with its corresponding submission data to verify the accuracy of manufacturer submission beyond standard business rules.Section 209 of the 1990 Amendments to the Clea

  10. Acid rain compliance planning using decision analysis

    International Nuclear Information System (INIS)

    Norris, C.; Sweet, T.; Borison, A.

    1991-01-01

    Illinois Power Company (IP) is an investor-owned electric and natural gas utility serving portions of downstate Illinois. In addition to one nuclear unit and several small gas and/or oil-fired units, IP has ten coal-fired units. It is easy to understand the impact the Clean Air Act Amendments of 1990 (CAAA) could have on IP. Prior to passage of the CAAA, IP formed several teams to evaluate the specific compliance options at each of the high sulfur coal units. Following that effort, numerous economic analyses of compliance strategies were conducted. The CAAA have introduced a new dimension to planning under uncertainty. Not only are many of the familiar variables uncertain, but the specific form of regulation, and indeed, the compliance goal itself is hard to define. For IP, this led them to use techniques not widely used within their corporation. This paper summarizes the analytical methods used in these analyses and the preliminary results as of July, 1991. The analysis used three approaches to examine the acid rain compliance decision. These approaches were: (1) the 'most-likely,' or single-path scenario approach; (2) a multi-path strategy analysis using the strategies defined in the single-scenario analysis; and (3) a less constrained multi-path option analysis which selects the least cost compliance option for each unit

  11. Science to compliance: The WIPP success story

    International Nuclear Information System (INIS)

    Howarth, S.M.; Chu, M.S.; Shephard, L.E.

    1997-01-01

    The Waste Isolation Pilot Plant (WIPP) in southeast New Mexico has been studied as a transuranic waste repository for the past 23 years. During this time, an extensive site characterization, design, construction, and experimental program was completed to provide in-depth understanding of the dominant processes that are most likely to influence the containment of radionuclides for 10,000 years. The success of the program, however, is defined by the regulator in the context of compliance with performance criteria, rather than by the in-depth technical understanding typical of most scientific programs. The WIPP project was successful in making a transformation from science to compliance by refocusing and redirecting programmatic efforts toward the singular goal of meeting regulatory compliance requirements while accelerating the submittal of the Compliance Certification Application (CCA) by two months from the April 1994 Disposal Decision Plan (DDP) date of December 1996, and by reducing projected characterization costs by more than 40%. This experience is unparalleled within the radioactive waste management community and has contributed to numerous lessons learned from which the entire community can benefit

  12. Short communication: Genomic selection in a crossbred cattle population using data from the Dairy Genetics East Africa Project.

    Science.gov (United States)

    Brown, A; Ojango, J; Gibson, J; Coffey, M; Okeyo, M; Mrode, R

    2016-09-01

    Due to the absence of accurate pedigree information, it has not been possible to implement genetic evaluations for crossbred cattle in African small-holder systems. Genomic selection techniques that do not rely on pedigree information could, therefore, be a useful alternative. The objective of this study was to examine the feasibility of using genomic selection techniques in a crossbred cattle population using data from Kenya provided by the Dairy Genetics East Africa Project. Genomic estimated breeding values for milk yield were estimated using 2 prediction methods, GBLUP and BayesC, and accuracies were calculated as the correlation between yield deviations and genomic breeding values included in the estimation process, mimicking the situation for young bulls. The accuracy of evaluation ranged from 0.28 to 0.41, depending on the validation population and prediction method used. No significant differences were found in accuracy between the 2 prediction methods. The results suggest that there is potential for implementing genomic selection for young bulls in crossbred small-holder cattle populations, and targeted genotyping and phenotyping should be pursued to facilitate this. Copyright © 2016 American Dairy Science Association. Published by Elsevier Inc. All rights reserved.

  13. An investigation of the factors which influence and deter the compliance behaviour of Australian individual taxpayers

    OpenAIRE

    Devos, Ken Neil Harry

    2017-01-01

    The tax compliance literature indicates that many factors, including economic, social, psychological and demographic factors, have an impact on the compliance behaviour of taxpayers. Of the two main compliance theories, the economic deterrence theory model and social/fiscal psychology theory model, this study has adopted the latter. The aim of this study was to examine whether or not a relationship exists between selected tax compliance variables (both economic and non-economic) and the attit...

  14. Oxybiotest project: microorganisms under pressure. Hyperbaric oxygen (HBO and simple pressure interaction on selected bacteria

    Directory of Open Access Journals (Sweden)

    Zanon Vincenzo

    2012-09-01

    Full Text Available Abstract Background HyperBaric Oxygen (HBO therapy involves exposure to pure oxygen in a pressurized room, and it is an already well-established treatment for various conditions, including those originated by serious infections. Starting from the observation of an increased number of patients who were accessing our HBO units for diseases supported from concomitant multidrug-resistant microorganisms, as well as considering the evident clinical benefit and laboratory final outcome of those patients at the end of the treatment, aim of our study was to measure, or better define at least, if there was any interaction between a hyperbaric environment and some selected microorganisms and if those positive results were due to the increased oxygen partial pressure (pO2 value or just to the increased pressure, regardless of the fraction of inspired oxygen (FiO2 applied (21÷100%. Design and methods We applied various increased pO2 values in a hyperbaric environment. Our study design was tailored in four steps to answer four specific questions, ordered in a progressive process: OxyBioTest (OBT-1,2,3, and 4. Specifically, we chose to investigate possible changes in the Minimum Inhibitory Concentration (MIC and in the Minimum Bactericidal Concentration (MBC of multi-resistant microorganisms after a single session of hyperbaric therapy. Results OBT-1 and OBT-2 provide a semi-quantitative confirmation of the bacterio-cidal and cytostatic effects of HBO. HBO is cidal only if the total exposure pressure is elevated, and cidal or cytostatic effect are not always dependent on the pO2 applied. OBT-4 has shown the adjuvant effect of HBO and antimicrobial drug against some selected bacteria. Discussion We seem allowed to hypothesize that only in case of a good approach to a lesion, permitting smaller bacterial loads thanks to surgical debridement and/or eventual antibiotic therapy for example, You can observe the clear effectiveness of the HyperBaric Oxygen (HBO

  15. The Amsterdam Hip Protector Study: Compliance and determinants of compliance

    NARCIS (Netherlands)

    van Schoor, N.M.; Asma, G.; Smit, J.H.; Bouter, L.M.; Lips, P.T.A.M.

    2003-01-01

    Hip protectors appear to be effective in reducing the incidence of hip fractures. However, compliance is often poor. Therefore, the objective of this study was to examine the compliance and determinants of compliance with external hip protectors. A prospective study was performed in residents from

  16. Rocky Flats Compliance Program

    International Nuclear Information System (INIS)

    1994-02-01

    The Department of Energy (DOE) established the Office of Technology Development (EM-50) (OTD) as an element of Environmental Restoration and Waste Management (EM) in November 1989. The primary objective of the Office of Technology Development, Rocky Flats Compliance Program (RFCP), is to develop altemative treatment technologies for mixed low-level waste (wastes containing both hazardous and radioactive components) to use in bringing the Rocky Flats Plant (RFP) into compliance with Federal and state regulations and agreements. Approximately 48,000 cubic feet of untreated low-level mixed waste, for which treatment has not been specified, are stored at the RFP. The cleanup of the Rocky Flats site is driven by agreements between DOE, the Environmental Protection Agency (EPA), and the Colorado Department of Health (CDH). Under these agreements, a Comprehensive Treatment and Management Plan (CTMP) was drafted to outline the mechanisms by which RFP will achieve compliance with the regulations and agreements. This document describes DOE's strategy to treat low-level mixed waste to meet Land Disposal Restrictions and sets specific milestones related to the regulatory aspects of technology development. These milestones detail schedules for the development of technologies to treat all of the mixed wastes at the RFP. Under the Federal Facilities Compliance Act (FFCA), the CTMP has been incorporated into Rocky Flats Plant Conceptual Site Treatment Plan (CSTP). The CSTP will become the Rocky Flats Plant site Treatment Plan in 1995 and will supersede the CTMP

  17. Environmental compliance and cleanup

    Energy Technology Data Exchange (ETDEWEB)

    Black, D.G.

    1995-06-01

    This section of the 1994 Hanford Site Environmental Report summarizes the roles of the principal agencies, organizations, and public in environmental compliance and cleanup of the Hanford Site. Regulatory oversight, the Federal Facility Agreement and Consent Order, the role of Indian tribes, public participation, and CERCLA Natural Resource Damage Assessment Trustee Activities are all discussed.

  18. Validating year 2000 compliance

    NARCIS (Netherlands)

    A. van Deursen (Arie); P. Klint (Paul); M.P.A. Sellink

    1997-01-01

    textabstractValidating year 2000 compliance involves the assessment of the correctness and quality of a year 2000 conversion. This entails inspecting both the quality of the conversion emph{process followed, and of the emph{result obtained, i.e., the converted system. This document provides an

  19. Strategisk compliance og regulering

    DEFF Research Database (Denmark)

    Kühn Pedersen, Mogens

    2016-01-01

    Denne artikel introducerer strategisk compliance og påpeger dens samspil med klassiske og nyere former for reguleringer i digital værdiskabelse. Konteksten er den digitale økonomi, som vokser frem imellem den materielle økonomis bærepiller: Virksomheder og markeder, men består af en helt ny...... materialitet, som er det digitale univers og dets modsvarighed i nye krav til compliance. Den nye materialitet stiller nye krav, hvad angår digitale processer og transaktioner. Klassisk regulering, som aktører ikke selv kan ændre, støder på egenregulering, hvor aktørerne selv opsætter regler for at skabe...... digital værdi. Dette kalder på strategisk compliance. Med digitalisering er strategisk compliance sat på dagsordnen i reguleringsdebatten. Vi hævder, at regulering og egenregulering kan komme til at virke komplementært i det post-industrielle, digitaliserede samfund....

  20. Environmental compliance and cleanup

    International Nuclear Information System (INIS)

    Black, D.G.

    1995-01-01

    This section of the 1994 Hanford Site Environmental Report summarizes the roles of the principal agencies, organizations, and public in environmental compliance and cleanup of the Hanford Site. Regulatory oversight, the Federal Facility Agreement and Consent Order, the role of Indian tribes, public participation, and CERCLA Natural Resource Damage Assessment Trustee Activities are all discussed

  1. Financial Markets and Compliance

    NARCIS (Netherlands)

    van de Laar, T.A.H.M.; Bleker, Sylvie; Houben, Raf

    2017-01-01

    This chapter will focus on the goals of financial market regulation through the rules of economics, the strategies financial regulation employs to achieve these goals and the insights this provides for the compliance profession. For an overview of the goals and strategies of financial regulation

  2. Year 2000 compliance issues.

    Science.gov (United States)

    1999-03-01

    This month, we continue our coverage of the year 2000 (Y2K) problem as it affects healthcare facilities and the professionals who work in them. We present the following articles: "Checking PCs for Y2K Compliance"--In this article, we describe the probable sources of Y2K-related errors in PCs and present simple procedures for testing the Y2K compliance of PCs and application software. "Y2K Assessment Equipment Expectations"--In this article, we review the Y2K compliance data from a small sampling of hospitals to help answer the question "What percentage of medical equipment will likely be susceptible to Y2K problems?" "Y2K Labeling of Medical Devices"--In this article, we discuss the pros and cons of instituting a program to label each medical device with its Y2K status. Also in this section, we present an updated list of organizations that support ECRI's Position Statement on the testing of medical devices for Y2K compliance, which we published in the December 1998 issue of Health Devices (27[12]). And we remind readers of the services ECRI can offer to help healthcare institutions cope with the Y2K problem.

  3. The USAID Environmental Compliance Database

    Data.gov (United States)

    US Agency for International Development — The Environmental Compliance Database is a record of environmental compliance submissions with their outcomes. Documents in the database can be found by visiting the...

  4. EPRTM project experience: selection of partners and supply chain; Experiencia en Proyectos de EPTTM: seleccion de socios y cadena de suministros

    Energy Technology Data Exchange (ETDEWEB)

    Lorenzo, D. de

    2012-07-01

    With 4 EPRTM units under construction, the new plants to be built in the following years will benefit from the return on experience of the work already performed. The knowledge about licensing processes, detail engineering, supply chain, logistics and on-site work gathered from the Olkiluoto 3 and Flamanville 3 projects has already been used in the Taishan 1 and 2 project, resulting in a project that is on schedule and on budget. This article will show how the advantage of such broad experience gained will be used to benefit future projects to ensure certainty of completion, leaving few and limited unresolved issues even before the beginning of the project. Several areas that are not usually tackled when speaking of a New Build project will be covered by this text from the point of view of a nuclear vendor: Project Partnership Selection and the Gate Review Process applied by AREVA in the supply chain of the main components. (Author)

  5. Selected Area Fishery Evaluation Project Economic Analysis Study Final Report, Final Draft Revision 4: November 10, 2006.

    Energy Technology Data Exchange (ETDEWEB)

    Bonneville Power Administration; Washington Department of Fish and Wildlife; Oregon Department of Fish and Wildlife

    2006-11-01

    The purpose of this Study is to provide an economic review of current and proposed changes to the Select Area Fishery Evaluation Project (SAFE or Project). The Study results are the information requested in comments made on the Project by a joint review dated March 2005 by the Northwest Power and Conservation Council (NPCC) Independent Scientific Review Panel (ISRP) and Independent Economic Analysis Board (IEAB). North et al. (2006) addressed technical questions about operations and plans, and this report contains the response information for comments concerning Project economics. This report can be considered an economic feasibility review meeting guidelines for cost-effective analysis developed by the IEAB (2003). It also contains other economic measurement descriptions to illustrate the economic effects of SAFE. The SAFE is an expansion of a hatchery project (locally called the Clatsop Economic Development Council Fisheries Project or CEDC) started in 1977 that released an early run coho (COH) stock into the Youngs River. The Youngs River entrance to the Columbia River at River Mile 12 is called Youngs Bay, which is located near Astoria, Oregon. The purpose of the hatchery project was to provide increased fishing opportunities for the in-river commercial fishing gillnet fleet. Instead of just releasing fish at the hatchery, a small scale net pen acclimation project in Youngs Bay was tried in 1987. Hirose et al. (1998) found that 1991-1992 COH broodstock over-wintered at the net pens had double the smolt-to-adult return rate (SAR) of traditional hatchery release, less than one percent stray rates, and 99 percent fishery harvests. It was surmised that smolts from other Columbia River hatcheries could be hauled to the net pens for acclimation and release to take advantage of the SAR's and fishing rates. Proposals were tendered to Bonneville Power Administration (BPA) and other agencies to fund the expansion for using other hatcheries smolts and other off

  6. The new ECR charge breeder for the Selective Production of Exotic Species project at INFN—Laboratori Nazionali di Legnaro

    International Nuclear Information System (INIS)

    Galatà, A.; Patti, G.; Roncolato, C.; Angot, J.; Lamy, T.

    2016-01-01

    The Selective Production of Exotic Species (SPES) project is an ISOL facility under construction at Istituto Nazionale di Fisica Nucleare–Laboratori Nationali di Legnaro (INFN-LNL). 1+ radioactive ions, produced and extracted from the target-ion-source system, will be charge bred to high charge states by an ECR charge breeder (SPES-CB): the project will adopt an upgraded version of the PHOENIX charge breeder, developed since about twenty years by the Laboratoire de Physique Subatomique et de Cosmologie (LPSC). The collaboration between LNL and LPSC started in 2010 with charge breeding experiments performed on the LPSC test bench and led, in June 2014, to the signature of a Research Collaboration Agreement for the delivery of a complete charge breeder and ancillaries, satisfying the SPES requirements. Important technological aspects were tackled during the construction phase, as, for example, beam purity issues, electrodes alignment, and vacuum sealing. This phase was completed in spring 2015, after which the qualification tests were carried out at LPSC on the 1+/q+ test stand. This paper describes the characteristics of the SPES-CB, with particular emphasis on the results obtained during the qualification tests: charge breeding of Ar, Xe, Rb, and Cs satisfied the SPES requirements for different intensities of the injected 1+ beam, showing very good performances, some of which are “best ever” for this device

  7. The new ECR charge breeder for the Selective Production of Exotic Species project at INFN—Laboratori Nazionali di Legnaro

    Science.gov (United States)

    Galatà, A.; Patti, G.; Roncolato, C.; Angot, J.; Lamy, T.

    2016-02-01

    The Selective Production of Exotic Species (SPES) project is an ISOL facility under construction at Istituto Nazionale di Fisica Nucleare-Laboratori Nationali di Legnaro (INFN-LNL). 1+ radioactive ions, produced and extracted from the target-ion-source system, will be charge bred to high charge states by an ECR charge breeder (SPES-CB): the project will adopt an upgraded version of the PHOENIX charge breeder, developed since about twenty years by the Laboratoire de Physique Subatomique et de Cosmologie (LPSC). The collaboration between LNL and LPSC started in 2010 with charge breeding experiments performed on the LPSC test bench and led, in June 2014, to the signature of a Research Collaboration Agreement for the delivery of a complete charge breeder and ancillaries, satisfying the SPES requirements. Important technological aspects were tackled during the construction phase, as, for example, beam purity issues, electrodes alignment, and vacuum sealing. This phase was completed in spring 2015, after which the qualification tests were carried out at LPSC on the 1+/q+ test stand. This paper describes the characteristics of the SPES-CB, with particular emphasis on the results obtained during the qualification tests: charge breeding of Ar, Xe, Rb, and Cs satisfied the SPES requirements for different intensities of the injected 1+ beam, showing very good performances, some of which are "best ever" for this device.

  8. Beamspace dual signal space projection (bDSSP): a method for selective detection of deep sources in MEG measurements

    Science.gov (United States)

    Sekihara, Kensuke; Adachi, Yoshiaki; Kubota, Hiroshi K.; Cai, Chang; Nagarajan, Srikantan S.

    2018-06-01

    Objective. Magnetoencephalography (MEG) has a well-recognized weakness at detecting deeper brain activities. This paper proposes a novel algorithm for selective detection of deep sources by suppressing interference signals from superficial sources in MEG measurements. Approach. The proposed algorithm combines the beamspace preprocessing method with the dual signal space projection (DSSP) interference suppression method. A prerequisite of the proposed algorithm is prior knowledge of the location of the deep sources. The proposed algorithm first derives the basis vectors that span a local region just covering the locations of the deep sources. It then estimates the time-domain signal subspace of the superficial sources by using the projector composed of these basis vectors. Signals from the deep sources are extracted by projecting the row space of the data matrix onto the direction orthogonal to the signal subspace of the superficial sources. Main results. Compared with the previously proposed beamspace signal space separation (SSS) method, the proposed algorithm is capable of suppressing much stronger interference from superficial sources. This capability is demonstrated in our computer simulation as well as experiments using phantom data. Significance. The proposed bDSSP algorithm can be a powerful tool in studies of physiological functions of midbrain and deep brain structures.

  9. Normal compliance contact models with finite interpenetration

    Czech Academy of Sciences Publication Activity Database

    Eck, Ch.; Jarušek, Jiří; Stará, J.

    2013-01-01

    Roč. 208, č. 1 (2013), s. 25-57 ISSN 0003-9527 R&D Projects: GA AV ČR IAA100750802; GA ČR(CZ) GAP201/12/0671 Institutional support: RVO:67985840 Keywords : compliance models * approximation Subject RIV: BA - General Mathematics Impact factor: 2.022, year: 2013 http://link.springer.com/article/10.1007%2Fs00205-012-0602-8#

  10. Selection of adequate site location during early stages of construction project management: A multi-criteria decision analysis approach

    Science.gov (United States)

    Marović, Ivan; Hanak, Tomaš

    2017-10-01

    In the management of construction projects special attention should be given to the planning as the most important phase of decision-making process. Quality decision-making based on adequate and comprehensive collaboration of all involved stakeholders is crucial in project’s early stages. Fundamental reasons for existence of this problem arise from: specific conditions of construction industry (final products are inseparable from the location i.e. location has a strong influence of building design and its structural characteristics as well as technology which will be used during construction), investors’ desires and attitudes, and influence of socioeconomic and environment aspects. Considering all mentioned reasons one can conclude that selection of adequate construction site location for future investment is complex, low structured and multi-criteria problem. To take into account all the dimensions, the proposed model for selection of adequate site location is devised. The model is based on AHP (for designing the decision-making hierarchy) and PROMETHEE (for pairwise comparison of investment locations) methods. As a result of mixing basis feature of both methods, operational synergies can be achieved in multi-criteria decision analysis. Such gives the decision-maker a sense of assurance, knowing that if the procedure proposed by the presented model has been followed, it will lead to a rational decision, carefully and systematically thought out.

  11. Agricultural biogas. Intermediate assessment - Biogas Mission. The Energivie Program - Projects of development of farm-based methanization. Site selection, Visits of installations, Consultation of installers

    International Nuclear Information System (INIS)

    Maurer, Michel

    2005-06-01

    A first document presents Alsace pilot projects: technical and economic recalls, site pre-selection, project leader, description of the mobilisation of lipid co-substrates (interest of fats, modalities), regulatory context (for biogas production, electric energy supply and digestate use). It also presents installer companies which have been consulted for these projects. Another document proposes technical and economical analyses of proposals made by installers, and an analysis of deadlocking points for these pilot projects. Technical, economic, and environmental elements, as well as those dealing with installation management, costs and construction delays to be provided by the consulted company are indicated and commented

  12. HWVP compliance with the Hanford site solid waste acceptance criteria

    International Nuclear Information System (INIS)

    Bromm, R.; Ornelas, J.; Fundingsland, S.; Shah, K.

    1993-01-01

    In order to ensure that the Hanford Waste Vitrification Project (HWVP) will meet solid waste acceptance criteria, a review of the criteria was performed. The primary purpose of the study was to evaluate the modifications that will be required to bring the HWVP into compliance for secondary waste which will be generated during normal operations of the facility. To accomplish this objective, the current HWVP design was evaluated based on the criteria established. Once the non-compliance areas and potentially non-compliance areas were identified, alternative plant design modifications were proposed. This paper summarizes the results and recommendations of that study

  13. Agent Architectures for Compliance

    Science.gov (United States)

    Burgemeestre, Brigitte; Hulstijn, Joris; Tan, Yao-Hua

    A Normative Multi-Agent System consists of autonomous agents who must comply with social norms. Different kinds of norms make different assumptions about the cognitive architecture of the agents. For example, a principle-based norm assumes that agents can reflect upon the consequences of their actions; a rule-based formulation only assumes that agents can avoid violations. In this paper we present several cognitive agent architectures for self-monitoring and compliance. We show how different assumptions about the cognitive architecture lead to different information needs when assessing compliance. The approach is validated with a case study of horizontal monitoring, an approach to corporate tax auditing recently introduced by the Dutch Customs and Tax Authority.

  14. Managing quality and compliance.

    Science.gov (United States)

    McNeil, Alice; Koppel, Carl

    2015-01-01

    Critical care nurses assume vital roles in maintaining patient care quality. There are distinct facets to the process including standard setting, regulatory compliance, and completion of reports associated with these endeavors. Typically, multiple niche software applications are required and user interfaces are varied and complex. Although there are distinct quality indicators that must be tracked as well as a list of serious or sentinel events that must be documented and reported, nurses may not know the precise steps to ensure that information is properly documented and actually reaches the proper authorities for further investigation and follow-up actions. Technology advances have permitted the evolution of a singular software platform, capable of monitoring quality indicators and managing all facets of reporting associated with regulatory compliance.

  15. Scrubbers: A popular Phase I compliance strategy

    International Nuclear Information System (INIS)

    Fink, C.E.; Bissell, P.E.; Koch, B.J.; Rutledge, G.D.

    1992-01-01

    As utilities commit to compliance plans to meet the Phase I requirements of the Clean Air Act Amendments of 1990, there are indications that scrubbing may account for up to 50 percent of the total SO 2 reductions in Phase I. This paper presents and analyzes the critical reasons that explain how and why scrubber-based compliance strategies have developed into the least-cost option in Phase I for many utilities. A hypothetical utility system was simulated to study the impacts of various technological, legislative, and regulatory issues on compliance decisions and costs. Issues evaluated using the hypothetical system include the emissions cap, Clean Air Act and state incentives to scrub, improvements in scrubber technology and costs, and the integration of Phase I and II compliance strategies by the phased installation of scrubbers. In combination, these considerations increase the attractiveness of scrubbers during the 1995-1999 Phase I period. Other considerations that will ultimately influence the amount of Phase I scrubbing capacity include the additional power generation costs associated with fuel switching, the uncertainty of low-sulfur coal price projections, fuel supply flexibility, scrubber market aspects, and socioeconomic considerations

  16. Ecological Monitoring and Compliance Program 2007 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hansen, Dennis; Anderson, David; Derek, Hall; Greger, Paul; Ostler, W. Kent

    2008-03-01

    In accordance with U.S. Department of Energy (DOE) Order 450.1, 'Environmental Protection Program', the Office of the Assistant Manager for Environmental Management of the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) requires ecological monitoring and biological compliance support for activities and programs conducted at the Nevada Test Site (NTS). National Security Technologies, LLC (NSTec), Ecological Services has implemented the Ecological Monitoring and Compliance (EMAC) Program to provide this support. EMAC is designed to ensure compliance with applicable laws and regulations, delineate and define NTS ecosystems, and provide ecological information that can be used to predict and evaluate the potential impacts of proposed projects and programs on those ecosystems. This report summarizes the EMAC activities conducted by NSTec during calendar year 2007. Monitoring tasks during 2007 included eight program areas: (a) biological surveys, (b) desert tortoise compliance, (c) ecosystem mapping and data management, (d) sensitive plant monitoring, (e) sensitive and protected/regulated animal monitoring, (f) habitat monitoring, (g) habitat restoration monitoring, and (h) biological monitoring at the Nonproliferation Test and Evaluation Complex (NPTEC). The following sections of this report describe work performed under these eight areas.

  17. A proposal to prove compliance of ESD with EU-guidelines

    International Nuclear Information System (INIS)

    Tschurlovits, M.

    2001-01-01

    The question of compliance with the diagnostic reference levels issued as European Guidelines is discussed based upon measurements of entrance surface dose in four selected projections. The projections were chosen either for the higher dose associated with the investigation or the high frequency of the investigation. The results for the high dose projections lumbar spine and iv pyelography were found to be well below the guidelines. The results for the low dose projections chest pa and chest lat show a mean at about the guidance level. The parameters of the measurements are shown and possible reasons for the scattering of data are discussed. The parameters of the measurements are compared with the proposal of the EU. The main conclusion was a) that even when not all parameters are consistent with EU-guides, the dose is frequently much lower than required. In addition, the ranking in ESD was different for different techniques and different radiologists. Because an approved method to indicate compliance is not yet available, a proposal is given in order to make the guidelines executable. (author)

  18. Laboratory-based respiratory virus surveillance pilot project on select cruise ships in Alaska, 2013-15.

    Science.gov (United States)

    Rogers, Kimberly B; Roohi, Shahrokh; Uyeki, Timothy M; Montgomery, David; Parker, Jayme; Fowler, Nisha H; Xu, Xiyan; Ingram, Deandra J; Fearey, Donna; Williams, Steve M; Tarling, Grant; Brown, Clive M; Cohen, Nicole J

    2017-09-01

    Influenza outbreaks can occur among passengers and crews during the Alaska summertime cruise season. Ill travellers represent a potential source for introduction of novel or antigenically drifted influenza virus strains to the United States. From May to September 2013-2015, the Alaska Division of Public Health, the Centers for Disease Control and Prevention (CDC), and two cruise lines implemented a laboratory-based public health surveillance project to detect influenza and other respiratory viruses among ill crew members and passengers on select cruise ships in Alaska. Cruise ship medical staff collected 2-3 nasopharyngeal swab specimens per week from passengers and crew members presenting to the ship infirmary with acute respiratory illness (ARI). Specimens were tested for respiratory viruses at the Alaska State Virology Laboratory (ASVL); a subset of specimens positive for influenza virus were sent to CDC for further antigenic characterization. Of 410 nasopharyngeal specimens, 83% tested positive for at least one respiratory virus; 71% tested positive for influenza A or B virus. Antigenic characterization of pilot project specimens identified strains matching predominant circulating seasonal influenza virus strains, which were included in the northern or southern hemisphere influenza vaccines during those years. Results were relatively consistent across age groups, recent travel history, and influenza vaccination status. Onset dates of illness relative to date of boarding differed between northbound (occurring later in the voyage) and southbound (occurring within the first days of the voyage) cruises. The high yield of positive results indicated that influenza was common among passengers and crews sampled with ARI. This finding reinforces the need to bolster influenza prevention and control activities on cruise ships. Laboratory-based influenza surveillance on cruise ships may augment inland influenza surveillance and inform control activities. However, these

  19. Compliance with building energy regulations for new-build dwellings

    International Nuclear Information System (INIS)

    Pan, Wei; Garmston, Helen

    2012-01-01

    Despite increasingly stringent building energy regulations worldwide, non-compliance exists in practice. This paper examines the profile of compliance with building energy regulations for new-build dwellings. In total 404 new-build dwellings completed in the UK from 2006 to 2009 were investigated. Only a third of these dwellings were evidenced as being compliant with Building Regulations Part L (England and Wales). Such low compliance casts a serious concern over the achievability of the UK Government's target for all new-build homes to be ‘zero carbon’ from 2016. Clearly evidenced was a lack of knowledge of Part L and its compliance requirements among the supply and building control sides of new-build dwellings. The results also indicate that the compliance profile was influenced by factors including Standard Assessment Procedure (UK Government's methodology for energy efficiency) calculation submissions, learning and experience of builders and building controls with Part L, use of Part L1A checklist, the introduction of energy performance certificate (EPC), build method, dwelling type, and project size. Better compliance was associated with flats over houses and timber frame over masonry. The use of EPC and Part L1A checklist should be encouraged. Key to addressing the lack of compliance with building energy regulations is training. -- Highlights: ► There exists a lack of compliance, worldwide, with building energy regulations. ► The implementation of England and Wales building energy regulations is problematic. ► Training, learning and experience of builders and building control are critical. ► Energy performance certificate and Part L 2006 checklist helped achieve compliance. ► Flats achieved better compliance over houses; and timber frame over masonry.

  20. Methodology for the selection of routes for international cross-border line projects involving multiple objectives and decision-makers in the analyses of restrictions and environmental possibilities

    International Nuclear Information System (INIS)

    Angel S, Enrique; Cadena, Luis Fernando

    2005-01-01

    A scheme was developed and applied to select the optimum environmental route for international cross-border line projects, in a decision making context involving multiple objectives and multiple decision-makers, the project studied was the electricity interconnection for central America (SIEPAC) for which a prospective assessment was carried out regarding the restrictions and possibilities in the light of the Colombian environmental dimensions management model. The methodology proposed followed these stages: Definition and approval of the structure of environmental restriction and criticality variables, sectorization and selection of complex sections, definition of decision-makers for multi-objective analysis; design and application of consultation tool; definition and modeling of options applying SIG; sensitivity analysis of alternative routes and project's environment management. Different options were identified for insertion and permanence of the project according to the criteria of various interest groups and actors consulted: environmental authorities, electricity companies, scientific community and civil society

  1. Spent Nuclear Fuel Project Safety Management Plan

    International Nuclear Information System (INIS)

    Garvin, L.J.

    1996-02-01

    The Spent Nuclear Fuel Project Safety Management Plan describes the new nuclear facility regulatory requirements basis for the Spemt Nuclear Fuel (SNF) Project and establishes the plan to achieve compliance with this basis at the new SNF Project facilities

  2. Lab-Scale CO2 Capture Studies and Selection of most Promising Sorbent. CAPHIGAS Project Tasks Report. Years 2010-2011

    International Nuclear Information System (INIS)

    Marano, M.; Torreiro, Y.

    2012-01-01

    In this report the main activities carried out within the CAPHIGAS Project, ref. ENE2009-08002 financed by the Spanish Ministry of Science and Innovation for the first two years are reported. The aim of the project is the development of a hybrid system WGS-adsorbent-membrane for the separation of CO 2 with H 2 production and this report summarises the most relevant results obtained on tasks L-1 and L-2 which refer to the selection, characterisation and study at laboratory scale of different sorbent materials to select those more promising for the hybrid system proposed. (Author) 55 refs.

  3. Exploring the joint effect of atmospheric pollution and socioeconomic status on selected health outcomes: an overview of the PAISARC project

    International Nuclear Information System (INIS)

    Bard, D; Laurent, O; Filleul, L; Havard, S; Deguen, S; Segala, C; Pedrono, G; Riviere, E; Schillinger, C; Rouil, L; Arveiler, D; Eilstein, D

    2007-01-01

    Health socioeconomic gradients are well documented in developed countries, but incompletely explained. A portion of these health inequalities may be explained by environmental exposures. The objective of PAISARC is to explore the relations between socioeconomic status, air pollution exposure and two selected health outcomes-asthma exacerbations and myocardial infarction-at the level of a small area. The study design is ecological, using data available from the national census, with the residential block (French IRIS, 2000 people on average, National Institute of Statistics-INSEE) as the statistical unit. The setting is the Greater Strasbourg metropolitan area (450 000 inhabitants) in eastern France. We first constructed a socioeconomic status index, using 1999 national census data and principal component analysis at the resolution of these census blocks. Air pollution data were then modeled at the same resolution on an hourly basis for the entire study period (2000-2005). Health data were obtained from various sources (local emergency networks, the local population-based coronary heart disease registry, health insurance funds) according to the health outcome. We present here the initial results and discuss the methodological approaches best suited for the forthcoming steps of our project

  4. Credit scoring in the service of entrepreneurship in morocco: Pragmatic approach for the selection of promising projects

    Directory of Open Access Journals (Sweden)

    Bazzi Mehdi

    2016-08-01

    Full Text Available The different policies adopted at the national and international level aimed at investing in the youth to accelerate their development on all socio-economic, political and cultural sectors. This orientation is based on the considerable growth of this population of youth from 15 to 29 years old representing about one third of the total population of the MENA region (Middle East and North Africa (Approximately more than 100 million. However, lack of direction and support needed to fully contribute to the development of their communities, this potential can turn into frustration, as demonstrated by the "Arab Spring". In this sense and to promote the opportunities with these young people, Morocco has launched several employment programs like “Moukawalati” directing them to the world of entrepreneurship. From the perspective of successful operational deployment of these programs, this paper presents a practical approach of selection of the promising projects through the implementation of a highly predictive scoring approach adapted to the specificities of this segment of young micro-entrepreneurs

  5. Compliance. Regulatory policy P-211

    International Nuclear Information System (INIS)

    2001-05-01

    This regulatory policy describes the basic principles and directives for establishing and conducting the Canadian Nuclear Safety Commission (CNSC) Compliance Program. The program is aimed at securing compliance by regulated persons with regulatory requirements made under the Nuclear Safety and Control Act ('the Act'). The policy applies to persons who are regulated by the CNSC through the Act, regulations and licences, as well as by decisions and orders made under the Act. The policy applies to officers and employees of the CNSC, and its authorized representatives or agents, who are involved in developing and carrying out compliance activities. Compliance, in the context of this policy, means conformity by regulated persons with the legally binding requirements of the Act, and the CNSC regulations, licences, decisions, and orders made under the Act. Compliance activities are CNSC measures of promotion, verification and enforcement aimed at securing compliance by regulated person with the applicable legally binding requirements. (author)

  6. Compliance to antihypertensive therapy

    International Nuclear Information System (INIS)

    Almas, A.; Hameed, A.; Ahmed, B.; Islam, M.

    2006-01-01

    Objective: To determine compliance, factors affecting compliance to antihypertensive therapy and to compare compliant and non-compliant groups, in a tertiary care setting. Study Design: Analytical (cross-sectional) study. Place and Duration of Study: The outpatient clinics at the Aga Khan University from May 2004 to February 2005. Patients and Methods: Two hundred patients presenting to the outpatients clinic were included. All patients 18 years and above, who had stage 1 and 2 hypertension, had one clinic visit to a medicine clinic, 6 months prior to presentation and started on antihypertensive medicines, were included. Results: Sixty-six percent were males and 33.5 % were females. Mean age was 58.1 ( +- 12) years and mean duration of hypertension was 7.2 (+- 6.7) years. Fifty-seven percent were compliant and 43% were noncompliant. In the noncompliant group, 53.4 % had mild noncompliance, 24.4 % had severe non-compliance, while 22% had moderate noncompliance. Factors of noncompliance were 56.8% missed doses due to forgetfulness, 12.7% deliberately missed their doses, 11.6% could not take the medicine due to side effects, 10.4% did not take the dose due to increased number of tablets, 4.6% were not properly counseled by the physician and 3.48% did not take medicines due to cost issues. The mean systolic blood pressure was 126 +- 19.2 mmHg in the compliant group while it was 133 +- 16.5 mmHg in the noncompliant group (p-value 0.004). The mean diastolic blood pressure in the compliant group was 76 +- 11.9 mmHg, while in the noncompliant group it was 81.9 +- 10.9 mmHg (p-value 0.001). Conclusion: Compliance to antihypertensive therapy in a tertiary care center is significantly good. Forgetfulness was the major reason for noncompliance. The mean blood pressure control was better in the compliant group. (author)

  7. Environmental compliance considerations for the management of cultural resources

    International Nuclear Information System (INIS)

    Curtis, S.A.; Whitfield, S.; McGinnis, K.

    1987-01-01

    This paper examines three key considerations underlying the programmatic management of cultural resources that may be affected by a large federal project. These considerations are statutory background and the compliance process, cultural resource compliance tasks, and quality assurance. The first consideration addresses the legal requirements and steps that must be met and taken for federal agencies to fulfill their cultural resource compliance responsibilities. The second consideration focuses on the tasks that must be performed by technical specialists to facilitate related federal and state compliance actions. The third consideration ensures that compliance requirements are being properly fulfilled. In the technical literature and compliance planning, archaeological and historic sites and Native American cultural resources are grouped under the general heading of cultural resources. Also included under this heading are the traditions and resources of Folk societies. Cultural resources encompass both material and nonmaterial aspects of our cultural heritage and include buildings, structures, objects, sites, districts, archaeological resources, places of religious importance, and unique, distinctive, or unusual lifeways. For compliance purposes, it is useful to treat these resources within four roughly chronological culture-historical periods: prehistoric, ethnohistoric, historic, and contemporary. 6 refs., 6 tabs

  8. Extrinsic incentives and tax compliance

    OpenAIRE

    Sour, Laura; Gutiérrez Andrade, Miguel Ángel

    2011-01-01

    This paper models the impact of extrinsic incentives in a tax compliance model. It also provides experimental evidence that confirms the existence of a positive relationship between rewards and tax compliance. If individuals are audited, rewards for honest taxpayers are effective in increasing the level of tax compliance. These results are particularly relevant in countries where there is little respect for tax law since rewards can contribute to crowding in the intrinsic motivation to comply.

  9. Managing compliance risk after Mifid

    OpenAIRE

    P. Musile Tanzi; G. Gabbi; D. Previati; P. Schwizer

    2013-01-01

    Purpose – The purpose of this paper is to focus on changes in the compliance function within major European banks and other financial intermediaries and on the effects of Markets in Financial Instruments Directive (MiFID) implementation. Design/methodology/approach – The four areas of research seek to answer the following questions: Is the positioning of the compliance function “at the top” of the organizational structure? Are the roles attributed to the compliance function, th...

  10. Farmers' compliance with the use of approved cocoa pesticides in ...

    African Journals Online (AJOL)

    The survey evaluates the awareness and level of compliance in the use of approved cocoa pesticides by local farmers in selected cocoa producing states of Nigeria. Thirty farmers were randomly selected in Kwara, Ogun and Osun States. More than 70 percent of the farmers were aware of banned cocoa pesticides.

  11. 24 CFR 5.655 - Section 8 project-based assistance programs: Owner preferences in selection for a project or unit.

    Science.gov (United States)

    2010-04-01

    .... However, selection is subject to the income-eligibility and income-targeting requirements in § 5.653. (2... its income in order to satisfy the targeting requirements of § 5.653(c). (4) Selection for particular... in the Affirmative Fair Housing Marketing plan (in accordance with § 108.25 of this title) as a...

  12. Quality beyond compliance.

    Science.gov (United States)

    Centanni, N; Monroe, M; White, L; Larson, R

    1999-01-01

    The service sector within the biopharmaceutical industry has experienced phenomenal growth over the past decade. In the highly regulated Good Laboratory Practices environment, the need for timely, high-quality service, accurate results, and on-time deliverables becomes paramount for the success and profitability of biopharmaceutical companies. The quality assurance process is a vital component of this drug product-development cycle and ensures compliance to the highest domestic and international regulatory standards. Quality-assurance professionals historically have held the role of independent auditors of the processes, who certify that results meet current standards of practice. Covance, a contract research organization that includes Good Laboratory Practices laboratories, reorganized and expanded the functional responsibilities of its quality assurance team in 1997. Auditors and quality assurance professionals have assumed roles beyond traditional compliance auditing and are forging new leadership and mentoring roles as process-improvement specialists. The results have been tangible, measurable benefits for clients and the Covance organization. This article provides an overview of this cultural change and the processes put in place to improve efficiency, productivity, and customer and employee satisfaction.

  13. Proactive compliance report 2004

    International Nuclear Information System (INIS)

    2005-01-01

    The Alberta Energy and Utilities Board (EUB) stipulates requirements to protect public safety, minimize environmental impacts, improve conservation, and ensure equity by promoting orderly and responsible energy development. Surveillance activities by the EUB, such as inspections and audits, ensures compliance with these requirements. This report presents statistical results of the enforcement ladder process (inspections, complaints, activities, major initiatives, and enforcement) for 2004 across ten EUB groups, including, Field Surveillance, Resources Applications Group, Operations Group, Environment Group, Utilities Branch, Facilities Applications Group, Corporate Compliance Group, Fort McMurray, Information and Dissemination Group, and Financial Management Group. When a noncompliance is identified, the EUB uses a process that has an established policy for EUB enforcement actions. Enforcement actions are determined by the severity of the noncompliance event and are escalated for subsequent noncompliance or failure to comply with the EUB's corrective order. Within the process, the EUB provides a grace period after an initial enforcement action. During this period, the EUB will take appropriate enforcement actions for subsequent noncompliances but will not escalate enforcement consequences. Enforcement consequences are escalated after the grace period has expired. 72 tabs

  14. Ecological Monitoring and Compliance Program Fiscal Year 1998 Report

    International Nuclear Information System (INIS)

    Bechtel Nevada Ecological Services

    1998-01-01

    The Ecological Monitoring and Compliance program, funded through the U. S. Department of Energy/Nevada Operations Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1998. Twenty-one sites for seven projects were surveyed for the presence of state or federally protected species. Three projects were in or near habitat of the threatened desert tortoise and required special clearance and transect surveys. All geospatial data collected were entered into Bechtel Nevada's Ecological Geographic Information system for use in ongoing ecosystem management of the NTS

  15. Formalizing and appling compliance patterns for business process compliance

    NARCIS (Netherlands)

    Elgammal, A.; Turetken, O.; van den Heuvel, W.; Papazoglou, M.

    2016-01-01

    Today’s enterprises demand a high degree of compliance of business processes to meet diverse regulations and legislations. Several industrial studies have shown that compliance management is a daunting task, and organizations are still struggling and spending billions of dollars annually to ensure

  16. Formalizing and applying compliance patterns for business process compliance

    NARCIS (Netherlands)

    Elgammal, A.F.S.A.; Türetken, O.; van den Heuvel, W.J.A.M.; Papazoglou, M.

    Today’s enterprises demand a high degree of compliance of business processes to meet diverse regulations and legislations. Several industrial studies have shown that compliance management is a daunting task, and organizations are still struggling and spending billions of dollars annually to ensure

  17. Diagnostic information for compliance checking of temporal compliance requirements

    NARCIS (Netherlands)

    Ramezani Taghiabadi, E.; Fahland, D.; Dongen, van B.F.; Aalst, van der W.M.P.; Salinesi, C.; Norrie, M.C.; Pastor, O.

    2013-01-01

    Compliance checking is gaining importance as today’s organizations need to show that operational processes are executed in a controlled manner while satisfying predefined (legal) requirements or service level agreements. Deviations may be costly and expose an organization to severe risks. Compliance

  18. The LLAMA Project: A SINFONI Study of Gas Outflows and Feeding in Local, X-ray Selected AGN

    Science.gov (United States)

    Shimizu, Thomas Taro; Davies, Richard; Burtscher, Leonard; Lin, Ming-yi

    2018-01-01

    We present new results from our survey of the inner few hundred parsecs of nearby galaxies as part of our Local Luminous AGN with Matched Analogues (LLAMA) project. AGN within the LLAMA sample were selected based on detection at ultra-hard X-rays (14-195 keV) by the Swift/Burst Alert Telescope ensuring the definitive presence of an AGN. We further imposed a redshift (z 42.5) cutoff to create a complete and volume-limited sample of nearby, luminous AGN. Inactive galaxies were chosen carefully by matching in redshift, host galaxy morphology, inclination, and stellar mass to create a clean sample with which to compare to the AGN. A subset of LLAMA AGN and inactive galaxies were observed with VLT/SINFONI using adaptive optics producing high spatial resolution integral field unit spectra in the H and K band. This unique IFU data allows for analysis of a suite of NIR emission lines including [FeII], H2 (1-0) S(1), [SiVI], and Br-gamma to probe the ionized and warm molecular gas in the circumnuclear region as well as CO absorption lines to probe the stellar disk. I will present initial results from our study including the prevalence of AGN outflows along with their geometry, kinematics, and mass outflow rates and compare the mass, state, and excitation mechanisms of circumnuclear gas between AGN and inactive galaxies. Finally, I will discuss our results in the context of AGN fuelling and feedback and provide insight on interpreting similar data at higher redshift.

  19. Summary of computational support and general documentation for computer code (GENTREE) used in Office of Nuclear Waste Isolation Pilot Salt Site Selection Project

    International Nuclear Information System (INIS)

    Beatty, J.A.; Younker, J.L.; Rousseau, W.F.; Elayat, H.A.

    1983-01-01

    A Decision Tree Computer Model was adapted for the purposes of a Pilot Salt Site Selection Project conducted by the Office of Nuclear Waste Isolation (ONWI). A deterministic computer model was developed to structure the site selection problem with submodels reflecting the five major outcome categories (Cost, Safety, Delay, Environment, Community Impact) to be evaluated in the decision process. Time-saving modifications were made in the tree code as part of the effort. In addition, format changes allowed retention of information items which are valuable in directing future research and in isolation of key variabilities in the Site Selection Decision Model. The deterministic code was linked to the modified tree code and the entire program was transferred to the ONWI-VAX computer for future use by the ONWI project

  20. Compliance Issues in Higher Education

    Science.gov (United States)

    Benedek, Petra

    2016-01-01

    Efficiency in the 1980's, quality in the 1990's, compliance in the 2010's - private sector management techniques and mechanisms find their way to public services. This paper facilitates the understanding of how compliance management controls can improve operations and prevent or detect failure or wrong doing. The last few years' empirical research…

  1. Diagnostic information in compliance checking

    NARCIS (Netherlands)

    Ramezani Taghiabadi, E.; Fahland, D.; Aalst, van der W.M.P.

    2012-01-01

    Compliance checking is gaining importance as today's organizations need to show that operational processes are executed in a controlled manner while satisfying predefined (legal) requirements. Deviations may be costly and expose the organization to severe risks. Compliance checking is of growing

  2. Ecological Monitoring and Compliance Program 2014 Report

    Energy Technology Data Exchange (ETDEWEB)

    Hall, Derek B. [National Security Technologies, LLC, Las Vegas, Nevada (United States); Anderson, David C. [National Security Technologies, LLC, Las Vegas, Nevada (United States); Greger, Paul D. [National Security Technologies, LLC, Las Vegas, Nevada (United States); Ostler, W. Kent [National Security Technologies, LLC, Las Vegas, Nevada (United States)

    2015-05-12

    The Ecological Monitoring and Compliance Program (EMAC), funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO, formerly Nevada Site Office), monitors the ecosystem of the Nevada National Security Site (NNSS) and ensures compliance with laws and regulations pertaining to NNSS biota. This report summarizes the program’s activities conducted by National Security Technologies, LLC (NSTec), during calendar year 2014. Program activities included (a) biological surveys at proposed activity sites, (b) desert tortoise compliance, (c) ecosystem monitoring, (d) sensitive plant species monitoring, (e) sensitive and protected/regulated animal monitoring, and (f) habitat restoration monitoring. During 2014, all applicable laws, regulations, and permit requirements were met, enabling EMAC to achieve its intended goals and objectives. Sensitive and protected/regulated species of the NNSS include 42 plants, 1 mollusk, 2 reptiles, 236 birds, and 27 mammals. These species are protected, regulated, or considered sensitive according to state or federal regulations and natural resource agencies and organizations. The desert tortoise (Gopherus agassizii) and the western yellow-billed cuckoo (Coccyzus americanus) are the only species on the NNSS protected under the Endangered Species Act, both listed as threatened. However, only one record of the cuckoo has ever been documented on the NNSS, and there is no good habitat for this species on the NNSS. It is considered a rare migrant. Biological surveys for the presence of sensitive and protected/regulated species and important biological resources on which they depend were conducted for 18 projects. A total of 199.18 hectares (ha) was surveyed for these projects. Sensitive and protected/regulated species and important biological resources found during these surveys included a predator burrow, one sidewinder rattlesnake (Crotalus cerastes), two mating speckled rattlesnakes

  3. Environmental compliance assessment review

    International Nuclear Information System (INIS)

    Hilliday, G.H.

    1991-01-01

    During the period 1972-1991, The United States Congress passed stringent environmental statues which the Environment Protection Agency implemented via regulations. The statues and regulations contain severe civil and criminal penalties. Civil violations resulted in fines, typically payable by the company. The act of willfully and knowingly violating the permit conditions or regulations can result in criminal charges being imposed upon the responsible part, i.e., either the company or individual. Criminal charges can include fines, lawyer fees, court costs and incarceration. This paper describes steps necessary to form an effective Environmental Compliance Assessment Review [CAR] program, train field and engineering personnel and perform a CAR audit. Additionally, the paper discusses the findings of a number of Exploration and Production [E and P] field audits

  4. Project for Establishing a Selected Dissemination of Information Service for the Faculty Members at Education and Psychology Faculty, University of Tehran

    Directory of Open Access Journals (Sweden)

    Gholamreza Fadaei

    2012-02-01

    Full Text Available The project aim was to establish an SDI (Selected Dissemination of Information service for the faculty members at University of Tehran, faculty of psychology and education. The project was carried out during the 2006-2007 period. First, a three stage survey was conducted to identify the information needs which were then served using a current awareness service over the period. Findings confirmed that the SDI project significantly impacted on the faculty information seeking behavior. Furthermore, there had been evidence supporting the fact that it has also influenced the quality of instruction by facilitating the overall efficacy of information sources collected. It was the intent of researchers to expand this project at later stages to include all humanities faculties in the university and if possible at a national level.

  5. Site observational work plan for the UMTRA Project Site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-03-01

    The U.S. Department of Energy (DOE) has prepared this initial site observational work plan (SOWP) for the Uranium Mill Tailings Remedial Action (UMTRA) Project site in Grand Junction, Colorado. This SOWP is one of the first UMTRA Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards (40 CFR Part 192, as amended by 60 FR 2854) for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement (PEIS). This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The DOE goal is to use the observational method to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation based on the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards

  6. An application of ETICS Co-Scheduling Mechanism to Interoperability and Compliance Validation of Grid Services

    CERN Document Server

    Ronchieri, Elisabetta; Diez-andino Sancho, Guillermo; DI Meglio, Alberto; Marzolla, Moreno

    2008-01-01

    Grid software projects require infrastructures in order to evaluate interoperability with other projects and compliance with predefined standards. Interoperability and compliance are quality attributes that are expected from all distributed projects. ETICS is designed to automate the investigation of this kind of problems. It integrates well-established procedures, tools and resources in a coherent framework and adaptes them to the special needs of these projects. Interoperability and compliance to standards are important quality attributes of software developed for Grid environments where many different parts of an interconnected system have to interact. Compliance to standard is one of the major factors in making sure that interoperating parts of a distributed system can actually interconnect and exchange information. Taking the case of the Grid environment (Foster and Kesselman, 2003), most of the projects that are developing software have not reached the maturity level of other communities yet and have di...

  7. Ecological Monitoring and Compliance Program Fiscal Year 2001 report

    International Nuclear Information System (INIS)

    Wills, C.A.

    2001-01-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early April. A

  8. Ecological Monitoring and Compliance Program Fiscal Year 2001

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Wills

    2001-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2001. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 23 NTS projects. Eleven sites were in desert tortoise habitat. These projects have the potential to disturb a total of 588 acres, where 568 acres of disturbance would be off-road driving. No tortoises were found in or displaced from project areas, and no tortoise s were accidentally injured or killed at project areas. One tortoise was crushed by a vehicle on a paved road. A topical report describing the classification of habitat types on the NTS was completed and distributed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. Compilation of historical wildlife data was initiated. A long-term monitoring plan for important plant species that occur on the NTS was completed. Site-wide monitoring was conducted for the western burrowing owl, bat species of concern, wild horses, and raptor nests. Sixty-nine of 77 known owl burrows were monitored. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid March to early

  9. 42 CFR 137.368 - Is the Secretary responsible for oversight and compliance of health and safety codes during...

    Science.gov (United States)

    2010-10-01

    ... compliance of health and safety codes during construction projects being performed by a Self-Governance Tribe... SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and Implementing Construction Project Agreements § 137.368 Is the Secretary responsible for oversight and compliance of health...

  10. Oil Mist Compliance

    International Nuclear Information System (INIS)

    Lazarus, Lloyd

    2009-01-01

    This report summarizes activities at the KCP related to evaluating and modifying machine tools in order to be in compliance with Section 23 of DOE 10 CFR 851, Worker Safety and Health Program. Section 851.23 (a) states that 'Contractors must comply with the following safety and health standards that are applicable to the hazards in their covered workplace', and subsection 9 contains the following applicable standard: 'American Congress of Governmental Industrial Hygienists (ACGIH), 'Threshold Limit Values for Chemical Substances and Physical Agents and Biological Exposure Indices,' (2005) (incorporated by reference, see (section)851.27) when the ACGIH Threshold Limit Values are lower (more protective) than permissible exposure limits in 29 CFR 1910'. In the 2005 ACGIH Threshold Limit Value book a Notice of Change was issued for exposure to mineral oil mist used in metalworking fluids (MWFs). The effects of planning for the new facility and which machine tools would be making the transition to the new facility affected which machine tools were modified

  11. Oil Mist Compliance

    Energy Technology Data Exchange (ETDEWEB)

    Lazarus, Lloyd

    2009-02-02

    This report summarizes activities at the KCP related to evaluating and modifying machine tools in order to be in compliance with Section 23 of DOE 10 CFR 851, Worker Safety and Health Program. Section 851.23 (a) states that “Contractors must comply with the following safety and health standards that are applicable to the hazards in their covered workplace”, and subsection 9 contains the following applicable standard: “American Congress of Governmental Industrial Hygienists (ACGIH), ‘Threshold Limit Values for Chemical Substances and Physical Agents and Biological Exposure Indices,’ (2005) (incorporated by reference, see §851.27) when the ACGIH Threshold Limit Values are lower (more protective) than permissible exposure limits in 29 CFR 1910.” In the 2005 ACGIH – Threshold Limit Value book a Notice of Change was issued for exposure to mineral oil mist used in metalworking fluids (MWFs). The effects of planning for the new facility and which machine tools would be making the transition to the new facility affected which machine tools were modified.

  12. The readiness of teachers to integrate information and communication technology for learning in a selected school in the GautengOnline project.

    OpenAIRE

    2008-01-01

    This study is aimed at providing the reader with a detailed description of the readiness of teachers to integrate Information and Communication Technology (ICT) for learning in a selected school in the GautengOnline (GoL) Project, through qualitative research design that used various data collecting methods: Questionnaire, observations and interview. A large number of teachers showed some interest in using ICT learning but had difficulties on how to get started due to the lack of suitable ICT...

  13. Optimal Site Selection of Wind-Solar Complementary Power Generation Project for a Large-Scale Plug-In Charging Station

    Directory of Open Access Journals (Sweden)

    Wenjun Chen

    2017-10-01

    Full Text Available The wind-solar hybrid power generation project combined with electric vehicle charging stations can effectively reduce the impact on the power system caused by the random charging of electric cars, contribute to the in-situ wind-solar complementary system and reduce the harm arising from its output volatility. In this paper, the site selection index system of a landscape complementary power generation project is established by using the statistical methods and statistical analysis in the literature. Subsequently, using the Analytic Network Process to calculate the index weight, a cloud model was used in combination with preference ranking organization method for enrichment evaluations to transform and sort uncertain language information. Finally, using the results of the decision-making for the location of the Shanghai wind-solar complementary project and by carrying out contrast analysis and sensitivity analysis, the superiority and stability of the decision model constructed in this study was demonstrated.

  14. Mathematics for secondary education project (Matem-UNA: perception of students about of the courses received and the profesional careers they selected for higher education

    Directory of Open Access Journals (Sweden)

    Ana Lucía Alfaro Arce

    2013-03-01

    Full Text Available This paper summarizes the opinions of students who have enrolled in the Precalculus course offered by the MATEM project. The aim is to systematize the views expressed by the students enrolled in MATEM, which are related to general aspects of the project, and also to know the professional areas these students select when entering to the university. The information for this study was collected through two questionnaires administered to the participating students during 2005-2009. The most relevant results are the following: the students listed benefits from MATEM such as the opportunity to practice for their Mathematics test (Ministry of Education exam, obtaining new knowledge and developing mathematical and reasoning skills. Most students would recommend others to participate in the project. Regarding the careers that students pursue, it was found a preference for higher studies in public universities at Costa Rica; these majors include mathematics courses in their curriculum (Engineering, Economics, Statistics, Medicine, among others.

  15. Y2K compliance countdown.

    Science.gov (United States)

    Arlotto, P W

    1999-01-01

    The new century brings unique challenges--especially Y2K compliance. This article presents nurse managers and executives with an overview of the issues and action steps to keep their organizations on track.

  16. Air Compliance Complaint Database (ACCD)

    Data.gov (United States)

    U.S. Environmental Protection Agency — THIS DATA ASSET NO LONGER ACTIVE: This is metadata documentation for the Region 7 Air Compliance Complaint Database (ACCD) which logs all air pollution complaints...

  17. The Italian compliance assurance programme

    International Nuclear Information System (INIS)

    Trivelloni, S.

    1999-01-01

    An overview is given of the compliance assurance programme that is applied in Italy and the role of the different competent authorities that have responsibilities for the transport of radioactive materials is described. (author)

  18. Integrated Compliance Information System (ICIS)

    Data.gov (United States)

    U.S. Environmental Protection Agency — The purpose of ICIS is to meet evolving Enforcement and Compliance business needs for EPA and State users by integrating information into a single integrated data...

  19. Compliance with air quality regulations

    International Nuclear Information System (INIS)

    Steen, D.V.; Tackett, D.L.

    1990-01-01

    Due to the probable passage of Clean Air Act Amendments in 1990, electric utilities throughout the United States are faced with numerous choices to comply with the new acid rain regulations, expected in 1991. The choice of a compliance plan is not a simple task. Every compliance option will be costly. At Ohio Edison, deliberations are quite naturally influenced by past compliance with air quality regulations. This paper discusses compliance with air quality regulations in the 1970's, clean coal technologies and advanced scrubbers, and compliance with air quality regulations in 1995 - 2000. The choice of a compliance strategy for many utilities will involve serving customer loads through some combination of scrubbers, clean coal technologies, fuel switching, fuel blending, redispatch of units, and emissions trading. Whatever the final choice, it must be economic while providing sufficient flexibility to accommodate the critical uncertainties of load growth, state regulatory treatment, markets for emission allowances, advancements in control technologies, additional federal requirements for air emissions, equipment outages and fuel supply disruptions.s

  20. Use of innovative projects in the Agenda procedure: Heating - ventilation - sanitary. Compilation of selected projects from data base of Deutsche Bundesstiftung Umwelt. CD-ROM of May 2000 as further added sources.; Nutzung innovativer Projekte im Agenda Prozess: Heizung - Lueftung - Sanitaer. Zusammenstellung ausgewaehlter Projekte aus der Datenbank der Deutschen Bundesstiftung Umwelt. CD-ROM vom Mai 2000 sowie weiterer hinzugezogene Quellen

    Energy Technology Data Exchange (ETDEWEB)

    Schefe, W. (comp.)

    2001-05-01

    Compilation of selected projects from data base of Deutsche Bundesstiftung Umwelt. (orig.) [German] Zusammenstellung ausgewaehlter Projekte aus der Datenbank der Deutschen Bundesstiftung Umwelt. (orig.)

  1. Significance of supplier selection criteria evolvment in IT outsourcing to emerging economies: lessons from a global IT outsourcing project

    OpenAIRE

    Hyvonen, H.; Helminen, M.; Watanabe, C.

    2015-01-01

    In line with the increasing significance of the acceleration of information technology (IT) advancement and also of harnessing the vigor of emerging economies, IT outsourcing to emerging economies has become global concerns. This enables global companies to enjoy a critical competitive edge by choosing the best option in outsourcing strategy and supplier selection. Consequently, supplier selection criteria have become critical issues for both suppliers and customers. This paper a...

  2. Short- and long-term effects of clinical audits on compliance with procedures in CT scanning.

    Science.gov (United States)

    Oliveri, Antonio; Howarth, Nigel; Gevenois, Pierre Alain; Tack, Denis

    2016-08-01

    To test the hypothesis that quality clinical audits improve compliance with the procedures in computed tomography (CT) scanning. This retrospective study was conducted in two hospitals, based on 6950 examinations and four procedures, focusing on the acquisition length in lumbar spine CT, the default tube current applied in abdominal un-enhanced CT, the tube potential selection for portal phase abdominal CT and the use of a specific "paediatric brain CT" procedure. The first clinical audit reported compliance with these procedures. After presenting the results to the stakeholders, a second audit was conducted to measure the impact of this information on compliance and was repeated the next year. Comparisons of proportions were performed using the Chi-square Pearson test. Depending on the procedure, the compliance rate ranged from 27 to 88 % during the first audit. After presentation of the audit results to the stakeholders, the compliance rate ranged from 68 to 93 % and was significantly improved for all procedures (P ranging from audit (P ranging from 0.114 to 0.999). Quality improvement through repeated compliance audits with CT procedures durably improves this compliance. • Compliance with CT procedures is operator-dependent and not perfect. • Compliance differs between procedures and hospitals, even within a unified department. • Compliance is improved through audits followed by communication to the stakeholders. • This improvement is sustainable over a one-year period.

  3. Analyzing the effect of selected control policy measures and sociodemographic factors on alcoholic beverage consumption in Europe within the AMPHORA project: statistical methods.

    Science.gov (United States)

    Baccini, Michela; Carreras, Giulia

    2014-10-01

    This paper describes the methods used to investigate variations in total alcoholic beverage consumption as related to selected control intervention policies and other socioeconomic factors (unplanned factors) within 12 European countries involved in the AMPHORA project. The analysis presented several critical points: presence of missing values, strong correlation among the unplanned factors, long-term waves or trends in both the time series of alcohol consumption and the time series of the main explanatory variables. These difficulties were addressed by implementing a multiple imputation procedure for filling in missing values, then specifying for each country a multiple regression model which accounted for time trend, policy measures and a limited set of unplanned factors, selected in advance on the basis of sociological and statistical considerations are addressed. This approach allowed estimating the "net" effect of the selected control policies on alcohol consumption, but not the association between each unplanned factor and the outcome.

  4. Site observational work plan for the UMTRA project site at Shiprock, New Mexico

    International Nuclear Information System (INIS)

    1994-09-01

    The site observational work plan (SOWP) for the Shiprock, New Mexico, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the initial document for developing site-specific activities to achieve regulatory compliance in the UMTRA Ground Water Project. The regulatory framework used to select the proposed ground water compliance strategies is presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. The Shiprock site consists of two, interconnected hydrogeologic systems: the terrace system and the floodplain system. Separate compliance strategies are proposed for these two systems. The compliance strategy for the terrace aquifer is no remediation with the application of supplemental standards based on classification of the terrace aquifer as having Class III (limited-use) ground water. The compliance strategy for the floodplain aquifer is active remediation using a subsurface biological barrier. These strategies were selected by applying site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement (PEIS) (DOE, 1994a). The site conceptual model indicates that milling-related contamination has impacted the ground water in the terrace and floodplain aquifers. Ground water occurs in both aquifers in alluvium and in fractures in the underlying Cretaceous age Mancos Shale. A mound of ground water related to fluids from the milling operations is thought to exist in the terrace aquifer below the area where settling ponds were in use during the mill operations. Most of the water occurring in the floodplain aquifer is from recharge from the San Juan River

  5. Sistemática proposta para seleção de fornecedores em gestão de projetos Systematic proposal for selecting suppliers in project management

    Directory of Open Access Journals (Sweden)

    Luciana Hazin Alencar

    2007-12-01

    Full Text Available A gestão de projetos vem sendo alvo de inúmeros estudos nos últimos anos, uma vez que os projetos estão se tornando cada vez mais complexos. Os fornecedores exercem papéis cruciais na gestão de projetos, estando envolvidos em uma rede de atividades conectadas que, se não desenvolvidas de forma adequada, podem comprometer o sucesso do projeto. Dessa forma, aumenta-se a necessidade de fornecedores qualificados, comprometidos com os objetivos do cliente e capazes de empreender os projetos solicitados. A questão abordada é a seleção de fornecedores para um empreendimento que atenda aos múltiplos objetivos dos decisores (representantes do cliente, de modo que desenvolvam um trabalho conjunto, reduzindo custos e promovendo melhorias nos processos construtivos, assegurando, a qualidade do produto final. Diante da complexidade do problema, propõe-se uma sistemática para seleção de fornecedores, que considera o processo de seleção integrada da equipe do projeto, mediante a revisão bibliográfica realizada.The project management has been the target of numerous studies in recent years since projects have become increasingly complex. The suppliers play crucial roles in project management being involved in a network of connected activities, which if not developed appropriatel, can compromise the success of the project. Hence, there has been a growing need for qualified suppliers, who are committed to the client’s objectives and are able to undertake the projects requested. The question brought up is the suppliers’ selection for a project according to the multiple criteria of the decision makers (clients representation , so they can undertake an integrated work reducing costs and providing improvements in the constructive processes, assuring the quality of the final product. Due to the complexity of the problem, a systematic proposal is put forward for selecting suppliers considering an integrated selection process of the project team

  6. Compliance monitoring in business processes: Functionalities, application, and tool-support.

    Science.gov (United States)

    Ly, Linh Thao; Maggi, Fabrizio Maria; Montali, Marco; Rinderle-Ma, Stefanie; van der Aalst, Wil M P

    2015-12-01

    In recent years, monitoring the compliance of business processes with relevant regulations, constraints, and rules during runtime has evolved as major concern in literature and practice. Monitoring not only refers to continuously observing possible compliance violations, but also includes the ability to provide fine-grained feedback and to predict possible compliance violations in the future. The body of literature on business process compliance is large and approaches specifically addressing process monitoring are hard to identify. Moreover, proper means for the systematic comparison of these approaches are missing. Hence, it is unclear which approaches are suitable for particular scenarios. The goal of this paper is to define a framework for Compliance Monitoring Functionalities (CMF) that enables the systematic comparison of existing and new approaches for monitoring compliance rules over business processes during runtime. To define the scope of the framework, at first, related areas are identified and discussed. The CMFs are harvested based on a systematic literature review and five selected case studies. The appropriateness of the selection of CMFs is demonstrated in two ways: (a) a systematic comparison with pattern-based compliance approaches and (b) a classification of existing compliance monitoring approaches using the CMFs. Moreover, the application of the CMFs is showcased using three existing tools that are applied to two realistic data sets. Overall, the CMF framework provides powerful means to position existing and future compliance monitoring approaches.

  7. Site observational work plan for the UMTRA project site at Grand Junction, Colorado

    International Nuclear Information System (INIS)

    1996-01-01

    This site observational work plan (SOWP) is one of the first Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project documents developed to select a compliance strategy that meets the UMTRA ground water standards for the Grand Junction site. This SOWP applies information about the Grand Junction site to the compliance strategy selection framework developed in the UMTRA Ground Water Project draft programmatic environmental impact statement. This risk-based, decision-making framework identifies the decision logic for selecting compliance strategies that could be used to meet the ground water standards. The US Department of Energy (DOE) goal is to implement a cost-effective site strategy that complies with the ground water standards and protects human health and the environment. Based on an evaluation of the site characterization and risk assessment data available for the preparation of this SOWP, DOE proposes that the most likely compliance strategy for the Grand Junction site is no remediation with the application of supplemental standards. This proposed strategy is based on a conceptual site model that indicates site-related contamination is confined to a limited-use aquifer as defined in the ground water standards. The conceptual model demonstrates that the uranium processing-related contamination at the site has affected the unconfined alluvial aquifer, but not the deeper confined aquifer

  8. Quality assurance plan for Final Waste Forms project in support of the development, demonstration, testing and evaluation efforts associated with the Oak Ridge reservation`s LDR/FFCA compliance

    Energy Technology Data Exchange (ETDEWEB)

    Gilliam, T.M.; Mattus, C.H.

    1994-07-01

    This quality assurance project plan specifies the data quality objectives for Phase I of the Final Waste Forms Project and defines specific measurements and processes required to achieve those objectives. Although the project is funded by the U.S. Department of Energy (DOE), the ultimate recipient of the results is the U.S. Environmental Protection Agency (EPA). Consequently, relevant quality assurance requirements from both organizations must be met. DOE emphasizes administrative structure to ensure quality; EPA`s primary focus is the reproducibility of the generated data. The ten criteria of DOE Order 5700.6C are addressed in sections of this report, while the format used is that prescribed by EPA for quality assurance project plans.

  9. Interventions to promote psychiatric patients' compliance to mental ...

    African Journals Online (AJOL)

    Method: A systematic review was chosen as a design to identify primary studies that answered the following research question: What is the current evidence on interventions to promote psychiatric patients' compliance to mental health treatment? Selected electronic databases were thoroughly searched. Studies were ...

  10. Review of selected non-seismic methods for onshore hydrocarbon exploration in Denmark. ALTKUL project report part 1

    Energy Technology Data Exchange (ETDEWEB)

    Rasmussen, T.M.; Thorning, L.

    2012-09-15

    Project ALTKUL was commissioned by DONG E and P A/S and Nordsoefonden; the Danish Energy Agency followed the project closely. The starting point of the study was the need in Danish onshore areas for more knowledge on alternative methods that could be used for hydrocarbon exploration, as an alternative to seismic investigations. DONG E and P A/S and Nordsoefonden approached GEUS, suggesting a study of seven different methods. The Danish Energy Agency was interested in the subject and requested that an actual test of a method be carried out as a part of the project. The seven methods considered and reviewed are: 1: Surface geochemistry; 2: Gravimetric modelling; 3: Magnetotellurics (MT, AMT and ZTEM); 4: High-Moment Electromagnetics (HMEM); 5: High-Powered Spectral Induced Polarization (HPSIP); 6: Electron Para-magnetic Resonance (EPR); 7: Airborne Transient Pulse Surveys. Getting a test of one of the methods based on electromagnetic theory organised caused some difficulties. An experiment with a galvanic controlled source was considered to be the optimum choice. However, based on various contacts and failed attempts to organise a test, a contract was entered with Uppsala University for some initial tests of the MT method. The test is to be carried out in August 2012 and will be reported in a separate report (ALTKUL Project Report Part 2). (LN)

  11. Growth rates and specific motor abilities as a function to predict the selection of talents taekwondo sport (Egyptian national project

    Directory of Open Access Journals (Sweden)

    Mohammed Mustafa Bakr

    2016-07-01

    Full Text Available The aim of this study is to investigate the contribution ratios of Growth rates and specific motor abilities as a function to predict the selection of talented taekwondo sport. The study was carried out on a sample of (755 individual Clubs and youth centers across the governorates of Egypt, and the average age (11.64 ± 0.48 years, height (144.06 ± 7.04 cm and weight (36.86 ± 7.51 kg. Tests were conducted in the period from 7/11/2011 to 29/12/2011 selected individuals underwent the following tests and measurements (Ability, Hinge flexibility basin, Agility, Kinetics speed in level trunk, Kinetics speed in level face, Endure Performance, Performance , the researcher used the descriptive survey method. The statistical analysis SPSS was used to apply formulas statistical by calculating: average, standard deviation, correlation, stepwise regression. The results showed that the growth rates and special motor abilities contribute to the selection of talented taekwondo. In addition, taekwondo players are characterized by flexibility, Endure performance and motor speed. The study concluded that there are five factors affect the selection of talented junior Taekwondo detailed flexibility contribute (28.8%, endure Performance contribute by (15.1%, ability contribute (7.8%, Growth rates (age, length, weight a contribution rate (5.2%, kinesthetic speed motor (in the level of the trunk - in the face level (1.1%. Predictable talented selection junior taekwondo through the following equation = 49.835 + Age (-0.389 + Length (0.157 + Weight (-0.188 + Flexibility (-0.359 + Ability (0.081 + Agility (-2.261 + Endure Performance (0.608 + Kinetics speed motor in the level of the trunk (0.586 + Kinetics speed motor in the face level (0.260. These results should be taken into account by the taekwondo Federation and trainers for use as an indicator for selecting talented taekwondo sport.

  12. Project Surveillance and Maintenance Plan

    International Nuclear Information System (INIS)

    1985-09-01

    The Project Surveillance and Maintenance Plan (PSMP) describes the procedures that will be used by the US Department of Energy (DOE), or other agency as designated by the President to verify that inactive uranium tailings disposal facilities remain in compliance with licensing requirements and US Environmental Protection Agency (EPA) standards for remedial actions. The PSMP will be used as a guide for the development of individual Site Surveillance and Maintenance Plans (part of a license application) for each of the UMTRA Project sites. The PSMP is not intended to provide minimum requirements but rather to provide guidance in the selection of surveillance measures. For example, the plan acknowledges that ground-water monitoring may or may not be required and provides the [guidance] to make this decision. The Site Surveillance and Maintenance Plans (SSMPs) will form the basis for the licensing of the long-term surveillance and maintenance of each UMTRA Project site by the NRC. Therefore, the PSMP is a key milestone in the licensing process of all UMTRA Project sites. The Project Licensing Plan (DOE, 1984a) describes the licensing process. 11 refs., 22 figs., 8 tabs

  13. Ecological Monitoring and Compliance Program Fiscal Year 2000 Report

    Energy Technology Data Exchange (ETDEWEB)

    Wills, C.A.

    2000-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, Nevada Operations Office, monitors the ecosystem of he Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 2000. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance,(3) ecosystem mapping, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species were conducted for 24 NTS projects. Seventeen sites were in desert tortoise habitat, and six acres of tortoise habitat were documented as being disturbed this year. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed. A topical report describing the classification of habitat types o n the NTS was completed. The report is the culmination of three years of field vegetation mapping and the analysis of vegetation data from over 1,500 ecological landform units. A long-term monitoring plan for important plant species that occur on the NTS was completed. Sitewide inventories were conducted for the western burrowing owl, bat species of concern, wild horses, raptor nests, and mule deer. Fifty-nine of 69 known owl burrows were monitored. Forty-four of the known burrows are in disturbed habitat. As in previous years, some owls were present year round on the NTS. An overall decrease in active owl burrows was observed within all three ecoregions (Mojave Desert, Transition, Great Basin Desert) from October through January. An increase in active owl burrows was observed from mid-March to early April. A total of 45 juvenile owls was detected from eight breeding pairs. One nest burrow was detected in the Mojave Desert,one in the Great Basin Desert, and six in the Transition

  14. Modelling of migration and fate of selected persistent organic pollutants in the Gulf of Gdansk and the Vistula catchment (Poland): selected results from the EU ELOISE EuroCat project

    Science.gov (United States)

    Zukowska, Barbara; Pacyna, Jozef; Namiesnik, Jacek

    2005-02-01

    The ELOISE EU EuroCat project integrated natural and social sciences to link the impacts affecting the coastal sea to the human activities developed along the catchments. In EuroCat project river catchments' changes and their impact on the inflow area were analysed. The information was linked with environmental models. The part of the EU ELOISE EuroCat project focusing on the Vistula River catchment and the Baltic Sea costal zone was named VisCat. Within the framework of the EU ELOISE EuroCat - VisCat project, CoZMo-POP (Coastal Zone Model for Persistent Organic Pollutants), a non-steady-state multicompartmental mass balance model of long-term chemical fate in the coastal environment or the drainage basin of a large lake environment was used. The model is parameterised and tested herein to simulate the long-term fate and distribution of selected HCHs (hexachlorocyclohexanes) and PCBs (polychlorinated biphenyls) in the Gulf of Gdansk and the Vistula River drainage basin environment. The model can also be used in the future to predict future concentrations in relation to various emission scenarios and in management of economic development and regulations of substance-emission to this environment. However, this would require more extensive efforts in the future on model parameterisation and validation in order to increase the confidence in current model outputs.

  15. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Perera, Aida [Universidad Metropolitana de Caracas, Departamento de Gestion Tecnologica, Caracas 1071, Edo Miranda (Venezuela); Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual [Universidad Politecnica de Valencia, Departamento de Proyectos de Ingenieria, Camino de vera s/n 46022 Valencia (Spain)

    2010-08-15

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  16. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    International Nuclear Information System (INIS)

    Smith-Perera, Aida; Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual

    2010-01-01

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  17. Effect of vegetation structure on breeding territory selection by red-winged blackbirds in a floodplain forest restoration project

    Science.gov (United States)

    Maria A. Furey; Dirk E. Burhans; Hong He; Michael A. Gold; Bruce E. Cutter

    2003-01-01

    Our research investigates the role of vegetation structure in the selection of breeding territories by red-winged blackbirds (Agelaius phoeniceus) in two floodplain oak-restoration sites. Perches are used extensively by red-winged blackbirds in territorial display during the spring (Yasukawa and Searcy 1995). We hypothesized that breeding territory...

  18. ICF's Plant Compliance Assessment System

    International Nuclear Information System (INIS)

    Baker, S.M.

    1989-01-01

    Government and private industrial facilities must manage wastes that are both radioactive and (chemically) hazardous. Until recently, these mixed wastes have been managed under rules established under the Atomic Energy Act (AEA) and the Low-Level Waste Policy At, and rules that derive from environmental legislation have not been applied. Both sets of rules now apply to mixed wastes, creating situations in which significant changes to waste steams must be made in order to bring them into compliance with environmental regulations. The first step in bringing waste streams into compliance is to determine their status with respect to the newly-applicable regulations. This process of compliance assessment is difficult because requirements to minimize human exposure to radiation can conflict with requirements of environmental regulations, many regulations are potentially applicable, the regulations are changing rapidly, and because waste streams designed to operate under AEA rules frequently cannot be easily modified to incorporate the additional regulations. Modern personal computer (PC) tools are being developed to help regulatory analysts manage the large amounts of information required to asses the compliance status of complex process plants. This paper presents the Plant Compliance Assessment System (PCAS), which performs this function by relating a database containing references to regulatory requirements to databases created to describe relevant aspects of the facility to be assessed

  19. Compliance status report for the Waste Isolation Pilot Plant

    Energy Technology Data Exchange (ETDEWEB)

    1994-03-31

    The US Department of Energy (DOE) is responsible for the disposition of transuranic (TRU) waste generated through national defense-related activities. Approximately 53,700 m{sup 2} of these wastes have been generated and are currently stored at government defense installations across the country. The Waste Isolation Pilot Plant (WIPP), located in southeastern New Mexico, has been sited and constructed to meet the criteria established by the scientific and regulatory community for the safe, long-term disposal of TRU and TRU-mixed wastes. This Compliance Status Report (CSR) provides an assessment of the progress of the WIPP Program toward compliance with long-term disposal regulations, set forth in Title 40 CFR 191 (EPA, 1993a), Subparts B and C, and Title 40 CFR {section}268.6 (EPA, 1993b), in order to focus on-going and future experimental and engineering activities. The CSR attempts to identify issues associated with the performance of the WIPP as a long-term repository and to focus on the resolution of these issues. This report will serve as a tool to focus project resources on the areas necessary to ensure complete, accurate, and timely submittal of the compliance application. This document is not intended to constitute a statement of compliance or a demonstration of compliance.

  20. Ecological Monitoring and Compliance Program Fiscal Year 2002 Report (Part Two of Two)

    Energy Technology Data Exchange (ETDEWEB)

    C. A. Wills

    2002-12-01

    The Ecological Monitoring and Compliance program, funded through the U.S. Department of Energy, National Nuclear Security Administration Nevada Operations Office, monitors the ecosystem of the Nevada Test Site (NTS) and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada (BN) during fiscal year 2002. Program activities included: (1) biological surveys at proposed construction sites, (2) desert tortoise compliance, (3) ecosystem mapping and data management, (4) sensitive species and unique habitat monitoring, and (5) biological monitoring at the HAZMAT Spill Center. Biological surveys for the presence of sensitive species and important biological resources were conducted for 26 NTS projects. These projects have the potential to disturb a total of 374 acres. Thirteen of the projects were in desert tortoise habitat, and 13.38 acres of desert tortoise habitat were disturbed. No tortoises were found in or displaced from project areas, and no tortoises were accidentally injured or killed at project areas or along paved roads. Compilation of historical wildlife data continued this year in efforts to develop faunal distribution maps for the NTS. Photographs associated with the NTS ecological landform units sampled to create the NTS vegetation maps were cataloged for future retrieval and analysis. The list of sensitive plant species for which long-term population monitoring is scheduled was revised. Six vascular plants and five mosses were added to the list. Plant density estimates from ten populations of Astragalus beatleyae were collected, and eight known populations of Eriogonum concinnum were visited to assess plant and habitat status. Minimal field monitoring of western burrowing owl burrows occurred. A report relating to the ecology of the western burrowing owl on the Nevada Test Site was prepared which summarizes four years of data collected on this species

  1. WIPP Regulatory Compliance Strategy and Management Plan for demonstrating compliance to long-term disposal standards

    International Nuclear Information System (INIS)

    1994-05-01

    The primary purpose of this document is to provide a strategy by which the WIPP will demonstrate its ability to perform as a deep geologic repository. The document communicates the DOE's understanding of the regulations related to long-term repository performance; and provides the most efficient strategy that intergrates WIPP Project elements, ensures the sufficiency of information, and provides flexibility for changes in the TRU waste generation system to facilitate the disposal of defense-generated TRU wastes. In addition, this document forms a focal point between the DOE and its various external regulators as well as other stakeholders for the purpose of arriving at compliance decisions that consider all relevant input

  2. COST AND TIME ESTIMATES DURING THE SUPPLIER SELECTION OF AN INFORMATION SYSTEM FOR LEGAL AREA: A CASE STUDY COMPARING TRADITIONAL AND AGILE PROJECT APPROACHES

    Directory of Open Access Journals (Sweden)

    Vieira, G. L. S.

    2017-06-01

    Full Text Available Considering a direct correlation between projects requirements details levels and their performance, this paper aims to evaluate whether the adoption of more extensive and detailed cost, time and scope estimation processes based on both practices, traditional and agile, and executed concurrently with the supplier selection stage, could guarantee greater accuracy in these estimates, thus increasing project success rates. Based on a case study for the information system project implementation into the legal area of a large Brazilian company, five suppliers had their proposals analyzed and compared in terms of the costs and deadlines involved, as well as the project management processes used in theirs estimates. From the obtained results, it was possible to observe that not all companies follow, at least during the prospecting phase, their service proposals described management processes, according to the theory. Another important finding was that the proposals involving, at least partially, agile approach concepts, were more likely to justify their estimates. These proposals still presented lower values, whenever compared to those less adherents to the theoretical concepts, as those based on traditional concepts.

  3. Portfolio theory in the selection of oil investment projects Teoria de carteiras na seleção de projetos de investimento em petróleo

    Directory of Open Access Journals (Sweden)

    Jalimar Guimarães Simplício

    2012-01-01

    Full Text Available The objective of this article is to compare investment project selection using the efficient frontier in the mean-variance space based on optimization models introduced by Markowitz (1952 with the project ranking method according to the profitability index (PI. The selection of real assets by companies did not incorporate the mean-variance optimization procedure in the same way the selection of financial assets in investment portfolios did. The process of selection and formation of portfolios of investment projects for the oil area of a company in the energy industry was analyzed. Project portfolios formed according to the usual company practice of ranking by their PI were compared with those that result from applying mean-variance optimization through Monte Carlo simulation, which allows the computation of mean returns, variances, and covariances for the set of projects considered. The inefficiency of project portfolios obtained by ranking according to the PI compared to those obtained by the method of Markowitz suggests that there are opportunities to improve the process of selecting the set of projects to be implemented by companies.O objetivo deste artigo é comparar a seleção de projetos de investimento segundo a fronteira eficiente no espaço média-variância com base em modelos de otimização introduzidos por Markowitz (1952 com o método do ordenamento de projetos segundo o índice de lucratividade (IL. A seleção de ativos reais pelas empresas não incorporou o procedimento de otimização de média-variância da mesma forma que na seleção de ativos financeiros para carteiras de investimento. O processo de seleção e formação de carteiras de projetos de investimento pela área de petróleo de uma empresa do setor de energia foi analisado. Carteiras de projetos constituídas de acordo com a prática usual da empresa de ordenamento pelo IL foram comparadas com as que resultariam da aplicação da otimização de m

  4. Caregivers' compliance with referral advice

    DEFF Research Database (Denmark)

    Lal, Sham; Ndyomugenyi, Richard; Paintain, Lucy

    2018-01-01

    BACKGROUND: Several malaria endemic countries have implemented community health worker (CHW) programmes to increase access to populations underserved by health care. There is considerable evidence on CHW adherence to case management guidelines, however, there is limited evidence on the compliance...... in the control arm were trained to treat malaria with ACTs based on fever symptoms. Caregivers' referral forms were linked with CHW treatment forms to determine whether caregivers complied with the referral advice. Factors associated with compliance were examined with logistic regression. RESULTS: CHW saw 18......,497 child visits in the moderate-to-high transmission setting and referred 15.2% (2815/18,497) of all visits; in the low-transmission setting, 35.0% (1135/3223) of all visits were referred. Compliance to referral was low, in both settings

  5. Compliance als Schutz vor Verbandsverantwortlichkeit?

    Directory of Open Access Journals (Sweden)

    Alexander Tipold

    2016-05-01

    Full Text Available Compliance bedeutet nicht nur Einhaltung und Beachtung von Vorschriften, sondern betrifft auch Maßnahmen, die die Einhaltung der Rechtsnormen absichern sollen und läuft somit auf eine Übererfüllung von Verpflichtungen hinaus. Wenn es keinen klaren Maßstab für Kontroll- und Überwachungspflichten gibt, besteht die Gefahr, dass Strafverfolgungsbehörden die Compliance-Maßnahmen als Maßstab heranziehen und so eine Verschärfung der Pflichten erzeugen. Nach den Regeln des Verbandsverantwortlichkeitsgesetzes schließt im Übrigen das beste Compliance-System nicht zwingend die Verbandsverantwortlichkeit aus, steht aber unter Umständen einem Verfahren gegen den Verband entgegen.

  6. A planning tool for tree species selection and planting schedule in forestation projects considering environmental and socio-economic benefits.

    Science.gov (United States)

    Rollan, Catherine Denise; Li, Richard; San Juan, Jayne Lois; Dizon, Liezel; Ong, Karl Benedict

    2018-01-15

    Species selection is a crucial step in the planning phase of forestation programs given its impact on the results and on stakeholder interactions. This study develops a planning tool for forestation programs that incorporates the selection of tree species and the scheduling of planting and harvesting, while balancing the maximization of the carbon sequestered and income realized, into the forestation decision-making and planning process. The validation of the goal programming model formulated demonstrates that the characteristics of natural tree species along with the behavior of growth and timing of yield are significant factors in achieving the environmental and socio-economic aspirations. The proposed model is therefore useful in gauging species behavior and performance over time. Sensitivity analysis was also conducted where the behavior of the income generated and carbon sequestered with respect to the external factors such as carbon market prices, percentage area allocated for protection and discount factor was assessed. Copyright © 2017 Elsevier Ltd. All rights reserved.

  7. Optimization of the choice of unmanned aerial vehicles used to monitor the implementation of selected construction projects

    Science.gov (United States)

    Skorupka, Dariusz; Duchaczek, Artur; Waniewska, Agnieszka; Kowacka, Magdalena

    2017-07-01

    Due to their properties unmanned aerial vehicles have huge number of possibilities for application in construction engineering. The nature and extent of construction works performedmakes the decision to purchase the right equipment significant for the possibility for its further use while monitoring the implementation of these works. Technical factors, such as the accuracy and quality of the applied measurement instruments are especially important when monitoring the realization of construction projects. The paper presents the optimization of the choice of unmanned aerial vehicles using the Bellinger method. The decision-making analysis takes into account criteria that are particularly crucial by virtue of the range of monitoring of ongoing construction works.

  8. Lectin Ulex europaeus agglutinin I specifically labels a subset of primary afferent fibers which project selectively to the superficial dorsal horn of the spinal cord.

    Science.gov (United States)

    Mori, K

    1986-02-19

    To examine differential carbohydrate expression among different subsets of primary afferent fibers, several fluorescein-isothiocyanate conjugated lectins were used in a histochemical study of the dorsal root ganglion (DRG) and spinal cord of the rabbit. The lectin Ulex europaeus agglutinin I specifically labeled a subset of DRG cells and primary afferent fibers which projected to the superficial laminae of the dorsal horn. These results suggest that specific carbohydrates containing L-fucosyl residue is expressed selectively in small diameter primary afferent fibers which subserve nociception or thermoception.

  9. Contemplating compliance: European compliance mechanisms in international perspective

    NARCIS (Netherlands)

    Koops, C.E.

    2014-01-01

    How can international organizations make their Member States comply with the rules of the organization? Which is the more effective method: to coax and entice, to argue and persuade, or to threaten and punish? On the basis of which criteria should a compliance mechanism be construed and applied,

  10. Assessing customs performance in the Mediterranean ports. KPI selection and Best practices identification as part of the MEDNET project

    Energy Technology Data Exchange (ETDEWEB)

    Morales Fusco, P.; Sauri Marchan, S.; Lekka, A.M.; Karousos, I.

    2016-07-01

    The seamless flow of goods, people and investments across the Mediterranean necessitates a well-functioning port and transport system. More efficient port operations enhance seamless logistics and promote safety, efficiency, interoperability and interconnectivity of transport networks in the Mediterranean area.To promote the exchange of knowledge and expertise relevant to port and customs procedures and simplification of clearance for vessels and cargoes in the Mediterranean, the MEDNET project was launched. As part of the project a common evaluation framework for the performance of ports in the form of a set of Key Performance Indicators (KPIs) together with a list of the best practices in terms of operations and customs procedures was developed.In total, 50 ports were analyzed and given a KPI regarding traffic, financial, operational and human resources, sustainability and customs procedures. The values were latter crossed with the current good practices on operation in terms of customs procedures. And a small correlation between KPIs performance and implantation degree of good practices in customs procedures was found. This presentation exposes the methodology to assess the ports’ performance and the best. (Author)

  11. The GULLS project: a comparison of vulnerabilities across selected ocean hotspots and implications for adaptation to global change.

    Science.gov (United States)

    Cochrane, K.; Hobday, A. J.; Aswani, S.; Byfield, V.; Dutra, L.; Gasalla, M.; Haward, M.; Paytan, A.; Pecl, G.; Plaganyi-Lloyd, E.; Popova, K.; Salim, S. S.; Savage, C.; Sauer, W.; van Putten, I. E.; Visser, N.; Team, T G

    2016-12-01

    The GULLS project, `Global learning for local solutions: Reducing vulnerability of marine-dependent coastal communities' has been underway since October 2014. The project has been investigating six regional `hotspots': marine areas experiencing rapid warming. These are south-east Australia, Brazil, India, Solomon Islands, South Africa, and the Mozambique Channel and Madagascar. Rapid warming could be expected to have social, cultural and economic impacts that could affect these countries in different ways and may already be doing so. GULLS has focused on contributing to assessing and reducing the vulnerability of coastal communities and other stakeholders dependent on marine resources and to facilitate adaptation to climate change and variability through an integrated and trans-disciplinary approach. It includes participants from Australia, Brazil, India, Madagascar, New Zealand, South Africa, the United Kingdom and the United States of America. The research programme has been divided into six inter-linked components: ocean models, biological and ecological sensitivity analyses, system models, social vulnerability, policy mapping, and communication and education. This presentation will provide a brief overview of each of these components and describe the benefits that have resulted from the collaborative and transdisciplinary approach of GULLS. Following the standard vulnerability elements of exposure, sensitivity and adaptive capacity, the vulnerabilities of coastal communities and other stakeholders dependent on marine resources in the five hotspots will be compared using a set of indicators derived and populated from results of the research programme. The implications of similarities and differences between the hotspots for adaptation planning and options will be described.

  12. Assessment of Non-Financial Criteria in the Selection of Investment Projects for Seed Capital Funding: the Contribution of Scientometrics and Patentometrics

    Directory of Open Access Journals (Sweden)

    Gustavo da Silva Motta

    2012-09-01

    Full Text Available The aim of this article is to assess the potential of using scientometric and patentometric indicators as a way of instrumentalizing the selection process of projects for seed capital funding. There is an increasing interest in technology based enterprises for their capacity to contribute to economic and social development, but there is also some difficulty in assessing non-financial criteria associated with technology for the purposes of financial funding. Thus, this research selected the case of the first enterprise invested in by the largest seed capital fund in Brazil, in order to create scientific and technological indicators and to assess the extent to which these indicators may contribute to understanding the market potential of the technology once it is assessed. It was concluded that scientometric and patentometric indicators favour the assessment process for non-financial criteria, in particular those criteria dealt with in this study: technology, market, divestment, and team.

  13. Vis-NIR spectrometric determination of Brix and sucrose in sugar production samples using kernel partial least squares with interval selection based on the successive projections algorithm.

    Science.gov (United States)

    de Almeida, Valber Elias; de Araújo Gomes, Adriano; de Sousa Fernandes, David Douglas; Goicoechea, Héctor Casimiro; Galvão, Roberto Kawakami Harrop; Araújo, Mario Cesar Ugulino

    2018-05-01

    This paper proposes a new variable selection method for nonlinear multivariate calibration, combining the Successive Projections Algorithm for interval selection (iSPA) with the Kernel Partial Least Squares (Kernel-PLS) modelling technique. The proposed iSPA-Kernel-PLS algorithm is employed in a case study involving a Vis-NIR spectrometric dataset with complex nonlinear features. The analytical problem consists of determining Brix and sucrose content in samples from a sugar production system, on the basis of transflectance spectra. As compared to full-spectrum Kernel-PLS, the iSPA-Kernel-PLS models involve a smaller number of variables and display statistically significant superiority in terms of accuracy and/or bias in the predictions. Published by Elsevier B.V.

  14. A multifaceted hospital-wide intervention increases hand hygiene compliance.

    Science.gov (United States)

    Patel, B; Engelbrecht, H; McDonald, H; Morris, V; Smythe, W

    2016-03-07

    Hand hygiene is an important and basic practice that should be used by all healthcare staff to protect both themselves and their patients against infection. Unfortunately hand hygiene compliance remains poor. To show an improvement in hand hygiene compliance using a multifaceted approach. This was a quasiexperimental pre-post intervention study design with a number of standardised interventions to promote hand hygiene. The World Health Organization hand hygiene multimodal (five-step) intervention approach was used. The study ran from June 2015 to August 2015 in 11 selected wards of a 975-bed tertiary and quaternary care public hospital (Groote Schuur Hospital, Cape Town, South Africa). The outcome was to assess improvement in hand hygiene compliance monthly over the 3 months, compared with non-intervention wards and compared with the wards' own performance measured in 2014. The study included both descriptive and analytical components. Post intervention, hand hygiene compliance showed a statistically significant improvement for before patient contact from 34% in 2014 to 76% in 2015 (p<0.05) and for after patient contact from 47% in 2014 to 82% in 2015 (p<0.05). The intervention improved hand hygiene compliance and can easily be replicated in other wards, resulting in sustaining a culture of hand hygiene improvement and behavioural change throughout the hospital.

  15. Tax Compliance Inventory: TAX-I Voluntary tax compliance, enforced tax compliance, tax avoidance, and tax evasion.

    Science.gov (United States)

    Kirchler, Erich; Wahl, Ingrid

    2010-06-01

    Surveys on tax compliance and non-compliance often rely on ad hoc formulated items which lack standardization and empirical validation. We present an inventory to assess tax compliance and distinguish between different forms of compliance and non-compliance: voluntary versus enforced compliance, tax avoidance, and tax evasion. First, items to measure voluntary and enforced compliance, avoidance, and evasion were drawn up (collected from past research and newly developed), and tested empirically with the aim of producing four validated scales with a clear factorial structure. Second, findings from the first analyses were replicated and extended to validation on the basis of motivational postures. A standardized inventory is provided which can be used in surveys in order to collect data which are comparable across research focusing on self-reports. The inventory can be used in either of two ways: either in its entirety, or by applying the single scales independently, allowing an economical and fast assessment of different facets of tax compliance.

  16. The test chemical selection procedure of the European Centre for the Validation of Alternative Methods for the EU Project ReProTect.

    Science.gov (United States)

    Pazos, Patricia; Pellizzer, Cristian; Stummann, Tina C; Hareng, Lars; Bremer, Susanne

    2010-08-01

    The selection of reference compounds is crucial for a successful in vitro test development in order to proof the relevance of the test system. This publication describes the criteria and the selection strategy leading to a list of more than 130 chemicals suitable for test development within the ReProTect project. The presented chemical inventory aimed to support the development and optimization of in vitro tests that seek to fulfill ECVAM's criteria for entering into the prevalidation. In order to select appropriate substances, a primary database was established compiling information from existing databases. In a second step, predefined selection criteria have been applied to obtain a comprehensive list ready to undergo a peer review process from independent experts with industrial, academic and regulatory background. Finally, a peer reviewed chemical list containing 13 substances challenging endocrine disrupter tests, additional 50 substances serving as reference chemicals for various tests evaluating effects on male and female fertility, and finally 61 substances were identified as known to provoke effects on the early development of mammalian offspring. The final list aims to cover relevant and specific mode/site of actions as they are known to be relevant for various substance classes. However, the recommended list should not be interpreted as a list of reproductive toxicants, because such a description requires proven associations with adverse effects of mammalian reproduction, which are subject of regulatory decisions done by involved competent authorities. Copyright 2010 Elsevier Inc. All rights reserved.

  17. Surrogate formulations for thermal treatment of low-level mixed waste, Part II: Selected mixed waste treatment project waste streams

    Energy Technology Data Exchange (ETDEWEB)

    Bostick, W.D.; Hoffmann, D.P.; Chiang, J.M.; Hermes, W.H.; Gibson, L.V. Jr.; Richmond, A.A. [Martin Marietta Energy Systems, Inc., Oak Ridge, TN (United States); Mayberry, J. [Science Applications International Corp., Idaho Falls, ID (United States); Frazier, G. [Univ. of Tennessee, Knoxville, TN (United States)

    1994-01-01

    This report summarizes the formulation of surrogate waste packages, representing the major bulk constituent compositions for 12 waste stream classifications selected by the US DOE Mixed Waste Treatment Program. These waste groupings include: neutral aqueous wastes; aqueous halogenated organic liquids; ash; high organic content sludges; adsorbed aqueous and organic liquids; cement sludges, ashes, and solids; chloride; sulfate, and nitrate salts; organic matrix solids; heterogeneous debris; bulk combustibles; lab packs; and lead shapes. Insofar as possible, formulation of surrogate waste packages are referenced to authentic wastes in inventory within the DOE; however, the surrogate waste packages are intended to represent generic treatability group compositions. The intent is to specify a nonradiological synthetic mixture, with a minimal number of readily available components, that can be used to represent the significant challenges anticipated for treatment of the specified waste class. Performance testing and evaluation with use of a consistent series of surrogate wastes will provide a means for the initial assessment (and intercomparability) of candidate treatment technology applicability and performance. Originally the surrogate wastes were intended for use with emerging thermal treatment systems, but use may be extended to select nonthermal systems as well.

  18. Surrogate formulations for thermal treatment of low-level mixed waste, Part II: Selected mixed waste treatment project waste streams

    International Nuclear Information System (INIS)

    Bostick, W.D.; Hoffmann, D.P.; Chiang, J.M.; Hermes, W.H.; Gibson, L.V. Jr.; Richmond, A.A.; Mayberry, J.; Frazier, G.

    1994-01-01

    This report summarizes the formulation of surrogate waste packages, representing the major bulk constituent compositions for 12 waste stream classifications selected by the US DOE Mixed Waste Treatment Program. These waste groupings include: neutral aqueous wastes; aqueous halogenated organic liquids; ash; high organic content sludges; adsorbed aqueous and organic liquids; cement sludges, ashes, and solids; chloride; sulfate, and nitrate salts; organic matrix solids; heterogeneous debris; bulk combustibles; lab packs; and lead shapes. Insofar as possible, formulation of surrogate waste packages are referenced to authentic wastes in inventory within the DOE; however, the surrogate waste packages are intended to represent generic treatability group compositions. The intent is to specify a nonradiological synthetic mixture, with a minimal number of readily available components, that can be used to represent the significant challenges anticipated for treatment of the specified waste class. Performance testing and evaluation with use of a consistent series of surrogate wastes will provide a means for the initial assessment (and intercomparability) of candidate treatment technology applicability and performance. Originally the surrogate wastes were intended for use with emerging thermal treatment systems, but use may be extended to select nonthermal systems as well

  19. ETHICS AND COMPLIANCE IN BUSINESS

    Directory of Open Access Journals (Sweden)

    ANDREESCU Nicoleta Alina

    2015-05-01

    Full Text Available In this paper, we have studied the evolution of the business ethics concept through the prism of definitions from some renowned authors in the field and through the approach model of the business ethics and by implementing it in the company level. We have found out that in the last 40 years this concept has evolved from a theoretical aspect, as well as a practical one. Companies are motivated to implement ethics and compliance programs in business so that they can manage the changes that come from society. If, until recently, all that mattered for a company was profit, in the last decades, the situation changed. In order to develop a durable business, it is essential to have a good reputation. Owning and implementing an ethics and compliance program in business has become an imperative for companies, regardless of their activity sector. The role of the compliance department becomes more pregnant in each company: the employees need safety, the existence of communication lines provides comfort. From the partners in business’ point of view, owning such a program is a necessity, a condition, and not conforming to the principles of business ethics can lead to the isolation of the company. The ethics and compliance programs in business are instruments that protect the company by implementing certain proactive identification mechanisms that ensure the development of an ethical organizational culture.

  20. Audit-based compliance control

    NARCIS (Netherlands)

    Cederquist, J.G.; Dimitrakos, T.; Corin, R.J.; Martinelli, F.; Ryan, P.Y.A.; Dekker, M.A.C.; Etalle, Sandro; Schneider, S.; den Hartog, Jeremy; Lenzini, Gabriele

    2007-01-01

    In this paper we introduce a new framework for controlling compliance to discretionary access control policies [Cederquist et al. in Proceedings of the International Workshop on Policies for Distributed Systems and Networks (POLICY), 2005; Corin et al. in Proceedings of the IFIP Workshop on Formal

  1. Context-aware compliance checking

    NARCIS (Netherlands)

    Werf, van der J.M.E.M.; Verbeek, H.M.W.; Aalst, van der W.M.P.; Barros, A.; Gal, A.; Kindler, E.

    2012-01-01

    Organizations face more and more the burden to show that their business is compliant with respect to many different boundaries. The activity of compliance checking is commonly referred to as auditing. As information systems supporting the organization’s business record their usage, process mining

  2. Selection of topologies for the PHOTONERGY{sup TM} project. Optimised design and control of inverter for photovoltaic systems: the AC-module

    Energy Technology Data Exchange (ETDEWEB)

    Baekhoej Kjaer, S.

    2002-06-01

    The PHOTONERGY{sup TM} project (also known as the former 'SolcelleInverter' project) is by this report carried into its third stage; the selection of a suitable topology for the AC-Module inverter. The selection of a suitable topology is based on State-Of-The-Art analysis a specifications and a comparison of four grid-tied inverters and nine dc/dc converters. This implies 23 possible combinations, from which nine is investigated with respect to efficiency in six working points, the number of components and to some extent also the rating of the components. The conclusion is that the target of a European efficiency of 93.7% is hard to achieve. But four of the examined, and two newly discovered, inverters are recommended for a further examination by means of estimations, calculations and simulations of: cost, complexity, robustness, efficiency and mass-production. The system-layout is also examined. The first layout implies that the PV-Module and the inverter is integrated into one unit and the second layout involves that the inverter is placed indoor. The layouts are compared with respect to cable-losses, enclosure demanding and lifetime. The conclusion is somehow ambiguous and a further investigation should be initiated in order to get a clear result. (au)

  3. Clean Air Markets - Compliance Query Wizard

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Compliance Query Wizard is part of a suite of Clean Air Markets-related tools that are accessible at http://ampd.epa.gov/ampd/. The Compliance module provides...

  4. 300 area TEDF permit compliance monitoring plan

    International Nuclear Information System (INIS)

    BERNESKI, L.D.

    1998-01-01

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease

  5. Mobile Source Emissions Regulatory Compliance Data Inventory

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Mobile Source Emissions Regulatory Compliance Data Inventory data asset contains measured summary compliance information on light-duty, heavy-duty, and non-road...

  6. 300 area TEDF permit compliance monitoring plan

    Energy Technology Data Exchange (ETDEWEB)

    BERNESKI, L.D.

    1998-11-20

    This document presents the permit compliance monitoring plan for the 300 Area Treated Effluent Disposal Facility (TEDF). It addresses the compliance with the National Pollutant Discharge Elimination System (NPDES) permit and Department of Natural Resources Aquatic Lands Sewer Outfall Lease.

  7. Mobile Source Emissions Regulatory Compliance Data

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Engine and Vehicle Compliance Certification and Fuel Economy Inventory contains measured emissions and fuel economy compliance information for all types of...

  8. PSD permit compliance strategies

    International Nuclear Information System (INIS)

    Cassada, J.; Astruc, S.

    1993-01-01

    Old Dominion is a not-for-profit generation and transmission cooperative owned by and serving twelve member electric distribution cooperatives in Virginia, Maryland and Delaware. These member cooperatives purchase from Old Dominion all the electric power they supply to over 345,000 member consumers. In 1988, Old Dominion evaluated its long term power needs, and the fact that 300 Megawatts (MW) of base power would have to be replaced by the end of 1994. A power supply alternative study was conducted, and concluded that the interests of the cooperative members would best be served through the construction of a conventional pulverized coal-fired generating units. After comprehensive evaluation and negotiations, Old Dominion signed a contract in April, 1989 with the Consortium of Combustion Engineering, H. B. Zachry, Black ampersand Veatch and Westinghouse for the turnkey construction of a 393 MW coal-fired facility. The contract included an option to build a second twin unit. This option was exercised in August, 1989, when Virginia Power joined Old Dominion as 50% partners in the Clover Project. The partnership agreement stipulates that Old Dominion is responsible for the licensing and construction of the plant and Virginia Power will be responsible for operations

  9. Corporate compliance: framework and implementation.

    Science.gov (United States)

    Fowler, N

    1999-01-01

    The federal government has created numerous programs to combat fraud and abuse. The government now encourages healthcare facilities to have a corporate compliance program (CCP), a plan that reduces the chances that the facility will violate laws or regulations. A CCP is an organization-wide program comprised of a code of conduct and written policies, internal monitoring and auditing standards, employee training, feedback mechanisms and other features, all designed to prevent and detect violations of governmental laws, regulations and policies. It is a system or method ensuring that employees understand and will comply with laws that apply to what they do every day. Seven factors, based on federal sentencing guidelines, provide the framework for developing a CCP. First, a facility must establish rules that are reasonably capable of reducing criminal conduct. Second, high-level personnel must oversee the compliance effort. Third, a facility must use due care in delegating authority in the compliance initiative. Fourth, standards must be communicated effectively to employees, and fifth, a facility must take reasonable steps to achieve compliance. Sixth, standards must be enforced consistently across the organization and last, standards must be modified or changed for reported concerns, to ensure they are not repeated. PROMINA Health System, Inc. in Atlanta, Ga., designed a program to meet federal guidelines. It started with a self-assessment to define its areas or risk. Next, it created the internal structure and assigned organizational responsibility for running the CCP. PROMINA then developed standards of business and professional conduct, established vehicles of communication and trained employees on the standards. Finally, it continues to develop evidence of the program's effectiveness by monitoring and documenting its compliance activities.

  10. Research on Contractor Selection Based on Project Partnership%项目合作关系下承包商选择的研究

    Institute of Scientific and Technical Information of China (English)

    王舜; 马钦海; 冯卓

    2012-01-01

    针对建筑行业中业主与承包商通过合作可以实现双方共赢,但传统的承包商选择模型难以选择到合作关系下的承包商这一问题,利用因子分析法对影响建筑行业中项目合作成功的16个变量进行分析,提出了项目合作关系下承包商选择的基本框架,从一个全新的角度诠释了合作关系下的承包商选择的标准.指出业主企业在竞购阶段选取项目合作的承包商时应注重承包商的这四个方面:合作意愿、敏捷性能力、合作能力和竞购能力,为业主企业在竞购阶段正确选择项目合作承包商提供参考.%In view of the fact that with a more traditional contractor selection model it is rather difficult to pick out the right contractors based on project partnership,although both clients and contractors might benefit through cooperation in the construction industry,a factor analysis is employed to analyze the 16 variables affecting the successful project cooperation in the construction industry.It then puts forward a basic framework of contractor selection based on project partnership and interprets the criteria for contractor selection from a new perspective.Finally,the paper points out that clients should attach great importance to the following four aspects: willingness to cooperate,agility,ability to cooperate and capability of procurement,which could provide reference for them to select appropriate contractors at the procurement stage.

  11. 14 CFR 26.49 - Compliance plan.

    Science.gov (United States)

    2010-01-01

    ... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Compliance plan. 26.49 Section 26.49... Data for Repairs and Alterations § 26.49 Compliance plan. (a) Compliance plan. Except for applicants... January 11, 2008, each person identified in §§ 26.43, 26.45, and 26.47, must submit a compliance plan...

  12. GENDER AND ETHNICITY DIFFERENCES IN TAX COMPLIANCE

    OpenAIRE

    Jeyapalan Kasipillai; Hijattulah Abdul Jabbar

    2006-01-01

    The purpose of this study is to investigate whether gender and ethnicity differences occur in relation to tax compliance attitude and behavior. Prior studies on tax compliance have focused little on gender as a predictor of compliance. In Malaysia, ethnic background of a taxpayer could be a major determinant of tax compliance. A personal interview approach is used to obtain information from taxpayers in urban towns. A t-test suggests that males and females were found to have similar compliant...

  13. State regulatory issues in acid rain compliance

    International Nuclear Information System (INIS)

    Solomon, B.D.; Brick, S.

    1992-01-01

    This article discusses the results of a US EPA workshop for state regulators and commission staff on acid rain compliance concerns. The topics of the article include the results of market-based emissions control, how emissions trading is expected to reduce emissions, public utility commissions approval of compliance plans, the purposes of the workshop, market information, accounting issues, regulatory process and utility planning, multi-state compliance planning, and relationship to other compliance issues

  14. Lake Charles CCS Project

    Energy Technology Data Exchange (ETDEWEB)

    Leib, Thomas [Leucadia Energy, LLC, Salt Lake City, UT (United States); Cole, Dan [Denbury Onshore, LLC, Plano, TX (United States)

    2015-06-30

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO2 generated in a large industrial gasification process and sequester the CO2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials

  15. Ecological Monitoring and Compliance Program Fiscal Year 1998 Report

    Energy Technology Data Exchange (ETDEWEB)

    Bechtel Nevada Ecological Services

    1998-10-01

    The Ecological Monitoring and Compliance program, funded through the U. S. Department of Energy/Nevada Operations Office, monitors the ecosystem of the Nevada Test Site and ensures compliance with laws and regulations pertaining to NTS biota. This report summarizes the program's activities conducted by Bechtel Nevada during fiscal year 1998. Twenty-one sites for seven projects were surveyed for the presence of state or federally protected species. Three projects were in or near habitat of the threatened desert tortoise and required special clearance and transect surveys. All geospatial data collected were entered into Bechtel Nevada's Ecological Geographic Information system for use in ongoing ecosystem management of the NTS.

  16. Selected ICAR Data from the SAPA-Project: Development and Initial Validation of a Public-Domain Measure

    Directory of Open Access Journals (Sweden)

    David M. Condon

    2016-01-01

    Full Text Available These data were collected during the initial evaluation of the International Cognitive Ability Resource (ICAR project. ICAR is an international collaborative effort to develop open-source public-domain tools for cognitive ability assessment, including tools that can be administered in non-proctored environments (e.g., online administration and those which are based on automatic item generation algorithms. These data provide initial validation of the first four ICAR item types as reported in Condon & Revelle [1]. The 4 item types contain a total of 60 items: 9 Letter and Number Series items, 11 Matrix Reasoning items, 16 Verbal Reasoning items and 24 Three-dimensional Rotation items. Approximately 97,000 individuals were administered random subsets of these 60 items using the Synthetic Aperture Personality Assessment method between August 18, 2010 and May 20, 2013. The data are available in rdata and csv formats and are accompanied by documentation stored as a text file. Re-use potential includes a wide range of structural and item-level analyses.

  17. Applying the Analytic Hierarchy Process to Oil Sands Environmental Compliance Risk Management

    Science.gov (United States)

    Roux, Izak Johannes, III

    Oil companies in Alberta, Canada, invested $32 billion on new oil sands projects in 2013. Despite the size of this investment, there is a demonstrable deficiency in the uniformity and understanding of environmental legislation requirements that manifest into increased project compliance risks. This descriptive study developed 2 prioritized lists of environmental regulatory compliance risks and mitigation strategies and used multi-criteria decision theory for its theoretical framework. Information from compiled lists of environmental compliance risks and mitigation strategies was used to generate a specialized pairwise survey, which was piloted by 5 subject matter experts (SMEs). The survey was validated by a sample of 16 SMEs, after which the Analytic Hierarchy Process (AHP) was used to rank a total of 33 compliance risks and 12 mitigation strategy criteria. A key finding was that the AHP is a suitable tool for ranking of compliance risks and mitigation strategies. Several working hypotheses were also tested regarding how SMEs prioritized 1 compliance risk or mitigation strategy compared to another. The AHP showed that regulatory compliance, company reputation, environmental compliance, and economics ranked the highest and that a multi criteria mitigation strategy for environmental compliance ranked the highest. The study results will inform Alberta oil sands industry leaders about the ranking and utility of specific compliance risks and mitigations strategies, enabling them to focus on actions that will generate legislative and public trust. Oil sands leaders implementing a risk management program using the risks and mitigation strategies identified in this study will contribute to environmental conservation, economic growth, and positive social change.

  18. The role of the compliance officer – a comparison of US, UK and German law and practice.

    OpenAIRE

    Kanzenbach, Katrin

    2017-01-01

    The thesis introduces the role of the corporate compliance officer under US, UK and German law and practice. The aim of the thesis is to analyze the compliance function within private sector companies in the three selected jurisdictions in order to establish a model of the German compliance officer. My research is intended to bridge the gap in knowledge concerning the applicable legal standards required to ensure the effectiveness of this position. There is a lack of uniformity and standardiz...

  19. 42 CFR 124.503 - Compliance level.

    Science.gov (United States)

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Compliance level. 124.503 Section 124.503 Public... Unable To Pay § 124.503 Compliance level. (a) Annual compliance level. Subject to the provisions of this... persons unable to pay if it provides for the fiscal year uncompensated services at a level not less than...

  20. 24 CFR 107.40 - Compliance meeting.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Compliance meeting. 107.40 Section... NONDISCRIMINATION AND EQUAL OPPORTUNITY IN HOUSING UNDER EXECUTIVE ORDER 11063 § 107.40 Compliance meeting. (a... allegedly in violation (respondent) shall be sent a Notice of Compliance Meeting and requested to attend a...

  1. 24 CFR 108.25 - Compliance meeting.

    Science.gov (United States)

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Compliance meeting. 108.25 Section... COMPLIANCE PROCEDURES FOR AFFIRMATIVE FAIR HOUSING MARKETING § 108.25 Compliance meeting. (a) Scheduling meeting. If an applicant fails to comply with requirements under § 108.15 or § 108.20 or it appears that...

  2. 22 CFR 209.6 - Compliance information.

    Science.gov (United States)

    2010-04-01

    ... 22 Foreign Relations 1 2010-04-01 2010-04-01 false Compliance information. 209.6 Section 209.6... § 209.6 Compliance information. (a) Cooperation and assistance. The Administrator shall to the fullest... and accurate compliance reports at such times, and in such form and containing such information, as...

  3. Type B Package Radioactive Material Contents Compliance

    International Nuclear Information System (INIS)

    HENSEL, STEVE

    2006-01-01

    Implementation of packaging and transportation requirements can be subdivided into three categories; contents compliance, packaging closure, and transportation or logistical compliance. This paper addresses the area of contents compliance within the context of regulations, DOE Orders, and appropriate standards. Common practices and current pitfalls are also discussed

  4. 300 Area TEDF NPDES Permit Compliance Monitoring Plan

    International Nuclear Information System (INIS)

    Loll, C.M.

    1994-01-01

    This monitoring plan describes the activities and methods that will be employed at the 300 Area Treated Effluent Disposal Facility (TEDF) in order to ensure compliance with the National Discharge Elimination System (NPDES) permit. Included in this document are a brief description of the project, the specifics of the sampling effort, including the physical location and frequency of sampling, the support required for sampling, and the Quality Assurance (QA) protocols to be followed in the sampling procedures

  5. Airborne pollutant concentrations and health risks in selected Apulia region (IT) areas: preliminary results from the Jonico-Salentino project

    Science.gov (United States)

    Buccolieri, Riccardo; Genga, Alessandra; De Donno, Antonella; Siciliano, Tiziana; Siciliano, Maria; Serio, Francesca; Grassi, Tiziana; Rispoli, Gennaro; Cavaiola, Mattia; Lionello, Piero

    2017-04-01

    The Jonico-Salentino project (PJS) is a multidisciplinary study funded by Apulia Region (Det. N. 188_RU - 10/11/2015) aiming to assess health risk of people living in the cities of Lecce, Brindisi and Taranto. Citizens are exposed to emissions from industrial sources, biomass burning, vehicular, naval and air traffic, as well as from natural radioactive sources (radon). In this context, this work presents some preliminary results obtained by the Unit of University of Salento (Lecce) during an experimental campaign carried out in the study areas. The campaign is devoted to (i) sample particulate matter (PM), (ii) measure micro-meteorological variables and (iii) evaluate exposure levels of residents to main pollutants. Specifically, PM is sampled using a low volume sampler, while meteorological variables (wind speed components and direction temperature, relative humidity, precipitation and global solar radiation) are measured by advanced instrumentation such as ultrasonic anemometers which allows for the estimation of turbulence fluxes. The early effects of exposure to air pollutants is evaluated by the frequency of micronucleus (a biomarker of DNA damage) in exfoliated buccal cells collected using a soft-bristled toothbrush from oral mucosa of primary school children enrolled in the study. PM concentration data collected during the campaign are characterised from a chemical and morphological point of view; the analysis of different groups of particles allows identifying different natural and anthropogenic emission sources. This is done in conjunction to the investigation of the influence of local meteorology to elucidate the contribution of specific types of sources on final concentration levels. Finally, all data are used to assess the health risk of people living in the study areas as consequence of exposure to airborne pollutants.

  6. PROPOSAL FOR A STEP OF SELECTION SUPPORT OF BEST PRACTICES FOR THE PILOTING OF THE EMARKETING PROJECTS

    Directory of Open Access Journals (Sweden)

    Sébastien BRUYÈRE

    2011-01-01

    Full Text Available With 1.8 billion investments on the web in the first semester of 2008, being14.7% of publicity investmentsi, E-marketing is a discipline which is in themiddle of media strategies. However, the evolutions of internet and of emarketingtools have developed a discipline becoming increasingly complexto understand.Although there are still many different methods of piloting,essentially based on the measure via the discipline of the Web Analytics, it’sdifficult today to predict e-marketing actions to set up to make fluctuate keyperformance indicators of web site and active e-marketing lever statisticauditing solution. However it is starting from these indicators that success ismeasured and that the profits of the online activities are maximized. Thus wepropose through this article, a method of qualification of the Best Practices inorder to assist the online marketers in the choice and the selection of thoseto improve the performance of a site and associated actions E-Marketing.

  7. QDD: a user-friendly program to select microsatellite markers and design primers from large sequencing projects.

    Science.gov (United States)

    Meglécz, Emese; Costedoat, Caroline; Dubut, Vincent; Gilles, André; Malausa, Thibaut; Pech, Nicolas; Martin, Jean-François

    2010-02-01

    QDD is an open access program providing a user-friendly tool for microsatellite detection and primer design from large sets of DNA sequences. The program is designed to deal with all steps of treatment of raw sequences obtained from pyrosequencing of enriched DNA libraries, but it is also applicable to data obtained through other sequencing methods, using FASTA files as input. The following tasks are completed by QDD: tag sorting, adapter/vector removal, elimination of redundant sequences, detection of possible genomic multicopies (duplicated loci or transposable elements), stringent selection of target microsatellites and customizable primer design. It can treat up to one million sequences of a few hundred base pairs in the tag-sorting step, and up to 50,000 sequences in a single input file for the steps involving estimation of sequence similarity. QDD is freely available under the GPL licence for Windows and Linux from the following web site: http://www.univ-provence.fr/gsite/Local/egee/dir/meglecz/QDD.html. Supplementary data are available at Bioinformatics online.

  8. Pilot studies for the North American Soil Geochemical Landscapes Project - Site selection, sampling protocols, analytical methods, and quality control protocols

    Science.gov (United States)

    Smith, D.B.; Woodruff, L.G.; O'Leary, R. M.; Cannon, W.F.; Garrett, R.G.; Kilburn, J.E.; Goldhaber, M.B.

    2009-01-01

    In 2004, the US Geological Survey (USGS) and the Geological Survey of Canada sampled and chemically analyzed soils along two transects across Canada and the USA in preparation for a planned soil geochemical survey of North America. This effort was a pilot study to test and refine sampling protocols, analytical methods, quality control protocols, and field logistics for the continental survey. A total of 220 sample sites were selected at approximately 40-km intervals along the two transects. The ideal sampling protocol at each site called for a sample from a depth of 0-5 cm and a composite of each of the O, A, and C horizons. The Ca, Fe, K, Mg, Na, S, Ti, Ag, As, Ba, Be, Bi, Cd, Ce, Co, Cr, Cs, Cu, Ga, In, La, Li, Mn, Mo, Nb, Ni, P, Pb, Rb, Sb, Sc, Sn, Sr, Te, Th, Tl, U, V, W, Y, and Zn by inductively coupled plasma-mass spectrometry and inductively coupled plasma-atomic emission spectrometry following a near-total digestion in a mixture of HCl, HNO3, HClO4, and HF. Separate methods were used for Hg, Se, total C, and carbonate-C on this same size fraction. Only Ag, In, and Te had a large percentage of concentrations below the detection limit. Quality control (QC) of the analyses was monitored at three levels: the laboratory performing the analysis, the USGS QC officer, and the principal investigator for the study. This level of review resulted in an average of one QC sample for every 20 field samples, which proved to be minimally adequate for such a large-scale survey. Additional QC samples should be added to monitor within-batch quality to the extent that no more than 10 samples are analyzed between a QC sample. Only Cr (77%), Y (82%), and Sb (80%) fell outside the acceptable limits of accuracy (% recovery between 85 and 115%) because of likely residence in mineral phases resistant to the acid digestion. A separate sample of 0-5-cm material was collected at each site for determination of organic compounds. A subset of 73 of these samples was analyzed for a suite of

  9. Analysis of borehole-radar reflection logs from selected HC boreholes at the Project Shoal area, Churchill County, Nevada; TOPICAL

    International Nuclear Information System (INIS)

    Lane, J.W. Jr.; Joesten, P.K.; Pohll, Greg; Mihevic, Todd

    2001-01-01

    Single-hole borehole-radar reflection logs were collected and interpreted in support of a study to characterize ground-water flow and transport at the Project Shoal Area (PSA) in Churchill County, Nevada. Radar logging was conducted in six boreholes using 60-MHz omni-directional electric-dipole antennas and a 60-MHz magnetic-dipole directional receiving antenna. Radar data from five boreholes were interpreted to identify the location, orientation, estimated length, and spatial continuity of planar reflectors present in the logs. The overall quality of the radar data is marginal and ranges from very poor to good. Twenty-seven reflectors were interpreted from the directional radar reflection logs. Although the range of orientation interpreted for the reflectors is large, a significant number of reflectors strike northeast-southwest and east-west to slightly northwest-southeast. Reflectors are moderate to steeply dipping and reflector length ranged from less than 7 m to more than 133 m. Qualitative scores were assigned to each reflector to provide a sense of the spatial continuity of the reflector and the characteristics of the field data relative to an ideal planar reflector (orientation score). The overall orientation scores are low, which reflects the general data quality, but also indicates that the properties of most reflectors depart from the ideal planar case. The low scores are consistent with reflections from fracture zones that contain numerous, closely spaced, sub-parallel fractures. Interpretation of borehole-radar direct-wave velocity and amplitude logs identified several characteristics of the logged boreholes: (1) low-velocity zones correlate with decreased direct-wave amplitude, indicating the presence of fracture zones; (2) direct-wave amplitude increases with depth in three of the boreholes, suggesting an increase in electrical resistivity with depth resulting from changes in mineral assemblage or from a decrease in the specific conductance of ground

  10. Analysis of borehole-radar reflection logs from selected HC boreholes at the Project Shoal area, Churchill County, Nevada

    Science.gov (United States)

    Lane, J.W.; Joesten, P.K.; Pohll, G.M.; Mihevic, Todd

    2001-01-01

    Single-hole borehole-radar reflection logs were collected and interpreted in support of a study to characterize ground-water flow and transport at the Project Shoal Area (PSA) in Churchill County, Nevada. Radar logging was conducted in six boreholes using 60-MHz omni-directional electric-dipole antennas and a 60-MHz magnetic-dipole directional receiving antenna.Radar data from five boreholes were interpreted to identify the location, orientation, estimated length, and spatial continuity of planar reflectors present in the logs. The overall quality of the radar data is marginal and ranges from very poor to good. Twenty-seven reflectors were interpreted from the directional radar reflection logs. Although the range of orientation interpreted for the reflectors is large, a significant number of reflectors strike northeast-southwest and east-west to slightly northwest-southeast. Reflectors are moderate to steeply dipping and reflector length ranged from less than 7 m to more than 133 m.Qualitative scores were assigned to each reflector to provide a sense of the spatial continuity of the reflector and the characteristics of the field data relative to an ideal planar reflector (orientation score). The overall orientation scores are low, which reflects the general data quality, but also indicates that the properties of most reflectors depart from the ideal planar case. The low scores are consistent with reflections from fracture zones that contain numerous, closely spaced, sub-parallel fractures.Interpretation of borehole-radar direct-wave velocity and amplitude logs identified several characteristics of the logged boreholes: (1) low-velocity zones correlate with decreased direct-wave amplitude, indicating the presence of fracture zones; (2) direct-wave amplitude increases with depth in three of the boreholes, suggesting an increase in electrical resistivity with depth resulting from changes in mineral assemblage or from a decrease in the specific conductance of ground

  11. Motivation for Compliance with Environmental Regulation

    DEFF Research Database (Denmark)

    Winter, Søren; May, Peter J.

    2001-01-01

    A combination of calculated, normative, and social motivations as well as awareness of rules and capacity to comply are thought to foster compliance with regulations. Hypotheses about these factors were tested with data concerning Danish farmers’ compliance with agro-environmental regulations....... Three key findings emerge: that farmers’ awareness of rules plays a critical role; that normative and social motivations are as influential as calculated motivations in enhancing compliance; and that inspectors’ enforcement style affects compliance differently from that posited in much of the literature...... compliance with social and environmental regulations....

  12. [Insufficient medication compliance in Parkinson's disease].

    Science.gov (United States)

    Aerts, Marjolein B; van der Eijk, Martijn; Kramers, Kees; Bloem, Bastiaan R

    2011-01-01

    Medication compliance is generally suboptimal, particularly in patients with complex polypharmacy. This generic treatment problem is described here for Parkinson's disease (PD). We would expect patients with PD to have good medication compliance, since missed doses immediately result in worsening of symptoms. However, recent research has revealed that PD patients demonstrate poor medication compliance. Poor medication compliance is particularly undesirable for patients with PD because regular intake of medication is required for optimal treatment effect. Possible ways of improving medication compliance are pharmacotherapeutic measures and behavioural interventions. Modern methods of communication (text message reminders) and 'smart' pill dispensers may be beneficial, but the advantages of such interventions have not yet been scientifically studied.

  13. The ATLAS3D project - I. A volume-limited sample of 260 nearby early-type galaxies: science goals and selection criteria

    Science.gov (United States)

    Cappellari, Michele; Emsellem, Eric; Krajnović, Davor; McDermid, Richard M.; Scott, Nicholas; Verdoes Kleijn, G. A.; Young, Lisa M.; Alatalo, Katherine; Bacon, R.; Blitz, Leo; Bois, Maxime; Bournaud, Frédéric; Bureau, M.; Davies, Roger L.; Davis, Timothy A.; de Zeeuw, P. T.; Duc, Pierre-Alain; Khochfar, Sadegh; Kuntschner, Harald; Lablanche, Pierre-Yves; Morganti, Raffaella; Naab, Thorsten; Oosterloo, Tom; Sarzi, Marc; Serra, Paolo; Weijmans, Anne-Marie

    2011-05-01

    The ATLAS3D project is a multiwavelength survey combined with a theoretical modelling effort. The observations span from the radio to the millimetre and optical, and provide multicolour imaging, two-dimensional kinematics of the atomic (H I), molecular (CO) and ionized gas (Hβ, [O III] and [N I]), together with the kinematics and population of the stars (Hβ, Fe5015 and Mg b), for a carefully selected, volume-limited (1.16 × 105 Mpc3) sample of 260 early-type (elliptical E and lenticular S0) galaxies (ETGs). The models include semi-analytic, N-body binary mergers and cosmological simulations of galaxy formation. Here we present the science goals for the project and introduce the galaxy sample and the selection criteria. The sample consists of nearby (D 15°) morphologically selected ETGs extracted from a parent sample of 871 galaxies (8 per cent E, 22 per cent S0 and 70 per cent spirals) brighter than MK statistically representative of the nearby galaxy population. We present the size-luminosity relation for the spirals and ETGs and show that the ETGs in the ATLAS3D sample define a tight red sequence in a colour-magnitude diagram, with few objects in the transition from the blue cloud. We describe the strategy of the SAURON integral field observations and the extraction of the stellar kinematics with the pPXF method. We find typical 1σ errors of ΔV≈ 6 km s-1, Δσ≈ 7 km s-1, Δh3≈Δh4≈ 0.03 in the mean velocity, the velocity dispersion and Gauss-Hermite (GH) moments for galaxies with effective dispersion σe≳ 120 km s-1. For galaxies with lower σe (≈40 per cent of the sample) the GH moments are gradually penalized by pPXF towards zero to suppress the noise produced by the spectral undersampling and only V and σ can be measured. We give an overview of the characteristics of the other main data sets already available for our sample and of the ongoing modelling projects.

  14. A Study to Determine the Correlation between Continuity of Care and Patient Medication Compliance

    Science.gov (United States)

    1984-08-01

    U (III FILE ’Y TO DETERMINE THE CORRELATION BETWEEN CONTINUITY OF CARE AND PATIENT MEDICATION COMPLIANCE IA Graduate Research Project Submitted to...43 APPENDIX A. PATIENT MEDICATION COMPLIANCE QUESTIONNAIRE . . . . . 45 B. COMPUTER CODED INPUT FORMAT . . . . . . . ...... 48 C. RESEARCH DATA...and that adhered to by the patient . This failure to comply with medical recommendations results in a waste of health resources, frustration to the

  15. Peer Assessment and Compliance Review (PACR) Innovative Strategies Report. California Court Appointed Special Advocates (CASA) Programs

    Science.gov (United States)

    Macro, Bronwen; Huang, Lee Ann

    2005-01-01

    This report focuses on the innovative strategies study component of the Peer Assessment and Compliance Review (PACR) project. California (Court Appointed Special Advocates) CASA programs have developed many innovative strategies to serve children in their communities. At each of the programs visited during the PACR project, the team identified at…

  16. 26 CFR 1.42-5 - Monitoring compliance with low-income housing credit requirements.

    Science.gov (United States)

    2010-04-01

    ... project, the 15-40 test under sections 42(g)(4) and 142 (d)(4)(B) for “deep rent skewed” projects; (ii... of Housing and Urban Development (HUD), 24 CFR 180.680, an adverse final decision by a substantially... in compliance at any time in the future, the Agency need not file Form 8823 in subsequent years to...

  17. Narratives of empowerment and compliance

    DEFF Research Database (Denmark)

    Wentzer, Helle; Bygholm, Ann

    2013-01-01

    Purpose: New technologies enable new forms of patient participation in health care. Thearticle discusses whether communication in online patient support groups is a source ofindividual as well as collective empowerment or to be understood within the tradition ofcompliance. The discussion is based...... of empowerment and compliance in patient care. On a collective level, the site isempowering the individual users to comply with ‘doctor’s recommendations’ as a group....

  18. Traceability and retrievability: Documentation, the bridge from science to compliance

    International Nuclear Information System (INIS)

    Warner, P.J.

    1997-01-01

    In this day of regulatory compliance, the fact that good science was practiced and documented is, in and of itself, not enough to assure a successful licensing or permitting result. A new level of documentation, that clearly walks a non-project reviewer through the traceability of all activities and decisions is required for successful acceptance of scientific results. Compliance reviewers (whether the Nuclear Regulatory Commission (NRC), Environmental Protection Agency (EPA), etc.) expect to verify the results of the scientific and program activities without the physical presence of the person or persons that conducted the activity. Traceability of activities and associated decisions through the retrieval of all associated records is a must. This presentation is based on lessons learned from the various quality assurance (QA) audits and program reviews of Sandia National Laboratories, Nuclear Waste Management Programs Center, scientific and programmatic documentation. The authors build a bridge from science to compliance from lessons learned. Here now is a somewhat fictional rendition of actual scientific testing and compliance support activities

  19. Patient compliance and supportive periodontal therapy: Study among young adults of Namakkal district

    Directory of Open Access Journals (Sweden)

    Subramanium Gokulanathan

    2014-01-01

    Full Text Available Aims: The aim of this study is to assess the patient compliance to supportive and maintenance periodontal therapy and to determine the reason for noncompliance among young adult patients of Namakkal district, India. Materials and Methods: This was a cross-sectional study conducted on 400 patients who underwent periodontal therapy and subsequently recalled for supportive and maintenance periodontal treatment in the Department of Periodontics, Vivekanandha Dental College for Women, Namakkal. Patients age group 25-35 years and of both gender were equally selected and grouped by occupation and socioeconomic status. According to their compliance with appointments, they are categorized as complete compliance, partially compliance and insufficient or noncompliance. Noncompliance and partially compliance patients were contacted and asked to rate their experience and reason for noncompliance. Results: In this study, 80% of patients showed complete compliance and were regular for supportive periodontal therapy appointments. Women were more regular in maintaining recall appointments than men. Salaried employers showed 84.3% complete compliance, while self-employed personals showed 77% complete compliance and 75% of nonworking personals were regular to the appointment schedule. Noncompliance person has quoted lack of time and forgetting the appointment date as a major reason for missed appointments. Conclusions: This study recommends the need for improvement in communication skills of practitioners and weekend appointment for patient undergoing periodontal maintenance therapy.

  20. Deposition, persistence and turnover of pollutants: first results from the EU project AquaTerra for selected river basins and aquifers

    DEFF Research Database (Denmark)

    Barth, J.A.C.; Steidle, D.; Kuntz, D.

    2007-01-01

    in laboratory studies with soils and aquifer material from selected sites. For sediment transport of contaminants, new flood sampling techniques revealed highest deposition rates of beta-hexachlorocyclohexane (beta-HCH) in river sediments at hotspot areas on the Mulde River in the Bitterfeld region (Elbe Basin...... that range from biogeochemistry, environmental engineering, computer modelling and chemistry to socio-economic sciences. Field study areas are the river basins of the Ebro, the Meuse, the Elbe and the Danube as well as the 3-km(2) French catchment of the Brevilles Spring. Within the first 2 years...... of the project more than 1700 samples of atmospherically deposited particles, sediments, and water have been collected in the above-mentioned systems. Results show clear spatial patterns of deposition of polyaromatic hydrocarbons (PAHs) with the highest rates in the Meuse Basin. For local inputs...

  1. Notification: Audit of the U.S. EPA's Compliance with the Federal Information Security Management Act (FISMA)

    Science.gov (United States)

    Project #OA-FY13-0280, May 9, 2013. The Office of Inspector General plans to begin fieldwork for an audit of the U.S. Environmental Protection Agency’s compliance with the Federal Information Security Management Act.

  2. Notification: Audit of the U.S. Environmental Protection Agency’s Compliance with the Federal Information Security Management Act

    Science.gov (United States)

    Project #OA-FY14-0135, February 10, 2014. The Office of Inspector General plans to begin fieldwork for an audit of the U.S. Environmental Protection Agency's compliance with the Federal Information Security Management Act (FISMA).

  3. The selection of the American-Polish joint venture projects for the Krakow program and results of the efforts to date

    Energy Technology Data Exchange (ETDEWEB)

    Gyorke, D.F.; Butcher, T.A.

    1995-12-31

    To implement the Krakow Clean Fossil Fuels and Energy Efficiency Program, eight U.S. firms were selected by the U.S. Department of Energy to market their technologies to reduce pollution from low emission sources in Krakow. The eight U.S. firms were selected by a competitive solicitation that required the proposing firms to themselves provide funding to match or exceed the funding provided by the Program. These U.S. firms and their Polish partner companies have begun sales and cooperative work efforts in Krakow, and some have already made initial equipment installations with measurable performance improvements. Following their efforts as part of the Program, these U.S.-Polish joint ventures will market their technologies and achieve the associated environmental benefits elsewhere in Poland and Eastern and Central Europe. As part of the Krakow Program a spreadsheet model was developed to compare technological options for supplying heat to the city by calculation and comparing the heating costs and associated emissions reduction for each option. Comparison of options is made on the basis of the user cost-per-metric ton of equivalent emissions reduction. For all options considered in the Krakow Program, this cost parameter has ranged from -$1469 (best) to $2650 (worst). The costs for technologies associated with the eight projects in the Krakow Program are at the lower end of this range placing these technologies among the most cost effective solutions to the pollution problems from the low emission sources.

  4. Kaiser Engineers Hanford internal position paper -- Project W-236A, Multi-function Waste Tank Facility -- Peer reviews of selected activities

    International Nuclear Information System (INIS)

    Stine, M.D.

    1995-01-01

    The purpose of this paper is to develop and document a proposed position on the performance of independent peer reviews on selected design and analysis components of the Title 1 [Preliminary] and Title 2 [Final] design phases of the Multi-Function Waste Tank Facility [MWTF] project. An independent, third-party peer review is defined as a documented critical review of documents, data, designs, design inputs, tests, calculations, or related materials. The peer review should be conducted by persons independent of those who performed the work, but who are technically qualified to perform the original work. The peer review is used to assess the validity of assumptions and functional requirements, to assess the appropriateness and logic of selected methodologies and design inputs, and to verify calculations, analyses and computer software. The peer review can be conducted at the end of the design activity, at specific stages of the design process, or continuously and concurrently with the design activity. This latter method is often referred to as ''Continuous Peer Review.''

  5. Vendor compliance with Ontario's tobacco point of sale legislation.

    Science.gov (United States)

    Dubray, Jolene M; Schwartz, Robert M; Garcia, John M; Bondy, Susan J; Victor, J Charles

    2009-01-01

    On May 31, 2006, Ontario joined a small group of international jurisdictions to implement legislative restrictions on tobacco point of sale promotions. This study compares the presence of point of sale promotions in the retail tobacco environment from three surveys: one prior to and two following implementation of the legislation. Approximately 1,575 tobacco vendors were randomly selected for each survey. Each regionally-stratified sample included equal numbers of tobacco vendors categorized into four trade classes: chain convenience, independent convenience and discount, gas stations, and grocery. Data regarding the six restricted point of sale promotions were collected using standardized protocols and inspection forms. Weighted estimates and 95% confidence intervals were produced at the provincial, regional and vendor trade class level using the bootstrap method for estimating variance. At baseline, the proportion of tobacco vendors who did not engage in each of the six restricted point of sale promotions ranged from 41% to 88%. Within four months following implementation of the legislation, compliance with each of the six restricted point of sale promotions exceeded 95%. Similar levels of compliance were observed one year later. Grocery stores had the fewest point of sale promotions displayed at baseline. Compliance rates did not differ across vendor trade classes at either follow-up survey. Point of sale promotions did not differ across regions in any of the three surveys. Within a short period of time, a high level of compliance with six restricted point of sale promotions was achieved.

  6. Compliance management and corporate governance; Compliance Management und Corporate Governance

    Energy Technology Data Exchange (ETDEWEB)

    Becker, Uwe [Stadt Frankfurt am Main (Germany); Alsheimer, Constantin; Kassebohm, Kristian; Reutler, Susanne [Mainova AG, Frankfurt (Germany)

    2009-08-15

    Starting in the year 2009, numerous changes in the financial system and accountancy a well as in the corporate law come into effect for enterprises. Thereby, the requirements substantially are intensified to their corporate governance. The actual well-known reproaches of bribery, corruption and injuries of data protection intensify the pressure on executive committees and supervisory boards in order to meet normative and ethical requirements. All the more is valid for power suppliers whose reputation can already carry damage out with the first suspicion. Already in 2008, Mainova AG (Frnkfurt/Main, Federal Republic of Germany) implemented a compliance management.

  7. Barriers to compliance with evidence-based care in trauma.

    Science.gov (United States)

    Rayan, Nadine; Barnes, Sunni; Fleming, Neil; Kudyakov, Rustam; Ballard, David; Gentilello, Larry M; Shafi, Shahid

    2012-03-01

    We have preciously demonstrated that trauma patients receive less than two-thirds of the care recommended by evidence-based medicine. The purpose of this study was to identify patients least likely to receive optimal care. Records of a random sample of 774 patients admitted to a Level I trauma center (2006-2008) with moderate to severe injuries (Abbreviated Injury Scale score ≥3) were reviewed for compliance with 25 trauma-specific processes of care (T-POC) endorsed by Advanced Trauma Life Support, Eastern Association for the Surgery of Trauma, the Brain Trauma Foundation, Surgical Care Improvement Project, and the Glue Grant Consortium based on evidence or consensus. These encompassed all aspects of trauma care, including initial evaluation, resuscitation, operative care, critical care, rehabilitation, and injury prevention. Multivariate logistic regression was used to identify patients likely to receive recommended care. Study patients were eligible for a total of 2,603 T-POC, of which only 1,515 (58%) were provided to the patient. Compliance was highest for T-POC involving resuscitation (83%) and was lowest for neurosurgical interventions (17%). Increasing severity of head injuries was associated with lower compliance, while intensive care unit stay was associated with higher compliance. There was no relationship between compliance and patient demographics, socioeconomic status, overall injury severity, or daily volume of trauma admissions. Little over half of recommended care was delivered to trauma patients with moderate to severe injuries. Patients with increasing severity of traumatic brain injuries were least likely to receive optimal care. However, differences among patient subgroups are small in relation to the overall gap between observed and recommended care. II.

  8. Use of acceptable knowledge to demonstrate TRAMPAC compliance

    International Nuclear Information System (INIS)

    Whitworth, Julia; Becker, Blair; Guerin, David; Shokes, Tamara

    2004-01-01

    Recently, Los Alamos National Laboratory-Carlsbad Operations (LANL-CO) has supported the Central Characterization Project (CCP) managed by the U.S. Department of Energy (DOE) in the shipment of transuranic (TRU) waste from various small-quantity TRU waste generators to hub sites or other DOE sites in TRUPACT-II shipping containers. This support has involved using acceptable knowledge (AK) to demonstrate compliance with various requirements of Revision 19 of the TRUPACT-II Authorized Methods of Payload Compliance (TRAMPAC). LANL-CO has worked to facilitate TRUPACT-II shipments from the University of Missouri Research Reactor (MURR) and Lovelace Respiratory Research Institute (LRRI) to Argonne National Laboratory-East (ANL-E) and Los Alamos National Laboratory (LANL), respectively. The latter two sites have TRU waste certification programs approved to ship waste to the Waste Isolation Pilot Plant (WIPP) for disposal. In each case, AK was used to satisfy the necessary information to ship the waste to other DOE facilities. For the purposes of intersite shipment, AK provided data to WIPP Waste Information System (WWIS) transportation modules to ensure that required information was obtained prior to TRUPACT-II shipments. The WWIS modules were used for the intersite shipments, not to enter certification data into WWIS, but rather to take advantage of a validated system to ensure that the containers to be shipped were compliant with TRAMPAC requirements, particularly in the evaluation of quantitative criteria. LANL-CO also assisted with a TRAMPAC compliance demonstration for homogeneous waste containers shipped in TRUPACT-II containers from ANL-E to Idaho National Engineering and Environmental Laboratory (INEEL) for the purpose of core sampling. The basis for the TRAMPAC compliance determinations was AK regarding radiological composition, chemical composition, TRU waste container packaging, and absence of prohibited items. Also, even in the case where AK is not used to

  9. Tax compliance costs: a business administration perspective

    OpenAIRE

    Eichfelder, Sebastian; Schorn, Michael

    2009-01-01

    The paper analyses the relationship of tax compliance costs and business strategy. Due to instruments, like information technology, simplified cash accounting or outsourcing compliance activities to tax advisers, private businesses have a set of strategies to optimize their tax compliance cost burden. Under the assumption of rational choice a private business should choose a cost-optimal administration strategy. In spite of that we find empirical evidence for small German businesses using onl...

  10. The creep compliance, the relaxation modulus and the complex compliance of linear viscoelastic, homogeneous, isotropic materials

    International Nuclear Information System (INIS)

    Wong, P.K.

    1989-01-01

    This paper reports on a study to obtain the creep compliance, the relaxation modulus and the complex compliance derived from the concept of mechanical resistance for the constitutive equation of a class of linear viscoelastic, homogeneous, isotropic materials

  11. 12 CFR 1710.19 - Compliance and risk management programs; compliance with other laws.

    Science.gov (United States)

    2010-01-01

    ... OVERSIGHT, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT SAFETY AND SOUNDNESS CORPORATE GOVERNANCE Corporate Practices and Procedures § 1710.19 Compliance and risk management programs; compliance with other laws. (a...

  12. Utilization of handheld computing to simplify compliance

    International Nuclear Information System (INIS)

    Galvin, G.; Rasmussen, J.; Haines, A.

    2008-01-01

    Monitoring job site performance and building a continually improving organization is an ongoing challenge for operators of process and power generation facilities. Stakeholders need to accurately capture records of quality and safety compliance, job progress, and operational experiences (OPEX). This paper explores the use of technology-enabled processes as a means for simplifying compliance to quality, safety, administrative, maintenance and operations activities. The discussion will explore a number of emerging technologies and their application to simplifying task execution and process compliance. This paper will further discuss methodologies to further refine processes through trending improvements in compliance and continually optimizing and simplifying through the use of technology. (author)

  13. EPA Enforcement and Compliance History Online

    Data.gov (United States)

    U.S. Environmental Protection Agency — The Environmental Protection Agency's Enforcement and Compliance History Online (ECHO) website provides customizable and downloadable information about environmental...

  14. Plasticity of Select Primary Afferent Projections to the Dorsal Horn after a Lumbosacral Ventral Root Avulsion Injury and Root Replantation in Rats

    Directory of Open Access Journals (Sweden)

    Allison J. Bigbee

    2017-07-01

    Full Text Available Injuries to the conus medullaris and cauda equina portions of the spinal cord result in neurological impairments, including paralysis, autonomic dysfunction, and pain. In experimental studies, earlier investigations have shown that a lumbosacral ventral root avulsion (VRA injury results in allodynia, which may be ameliorated by surgical replantation of the avulsed ventral roots. Here, we investigated the long-term effects of an L6 + S1 VRA injury on the plasticity of three populations of afferent projections to the dorsal horn in rats. At 8 weeks after a unilateral L6 + S1 VRA injury, quantitative morphological studies of the adjacent L5 dorsal horn showed reduced immunoreactivity (IR for the vesicular glutamate transporter, VGLUT1 and isolectin B4 (IB4 binding, whereas IR for calcitonin gene-related peptide (CGRP was unchanged. The IR for VGLUT1 and CGRP as well as IB4 binding was at control levels in the L5 dorsal horn at 8 weeks following an acute surgical replantation of the avulsed L6 + S1 ventral roots. Quantitative morphological studies of the L5 dorsal root ganglia (DRGs showed unchanged neuronal numbers for both the VRA and replanted series compared to shams. The portions of L5 DRG neurons expressing IR for VGLUT1 and CGRP, and IB4 binding were also the same between the VRA, replanted, and sham-operated groups. We conclude that the L5 dorsal horn shows selective plasticity for VGLUT1 and IB4 primary afferent projections after an L6 + S1 VRA injury and surgical repair.

  15. ENHANCING VOLUNTARY COMPLIANCE BY REDUCING COMPLIANCE COSTS: A TAXPAYER SERVICE APPROACH

    OpenAIRE

    Glenn Jenkins; EDWIN FORLEMU

    1993-01-01

    In this paper an overview is made of the determinants of voluntary tax compliance. Unlike previous treatments of this subject, the cost of taxpayer compliance is considered as an important determinant of overall level of voluntary compliance in a country. A number of ways that tax authorities reduce compliance are discussed, and the most common uses of information technology in providing taxpayer service is described. Finally, the paper considers some of the ways that such activities might be...

  16. [Evaporation of selected cytotoxic drugs and permeation of protective gloves--research into the occupational risks of health care personnel handling hazardous cytotoxic drugs (CYTO project)].

    Science.gov (United States)

    Dolezalová, L; Odráska, P; Gorná, L; Prudilová, M; Vejpustková, R; Bláha, L

    2009-01-01

    The CYTO project studies an important aspect of healthcare provision -long-term occupational exposure, both threshold and below-threshold, to chemical agents with carcinogenic and mutagenic properties, with the major focus on antineoplastic drugs.This contribution presents experimental results from the first stages of the project's experimental work, i.e. an evaluation of the physico-chemical characteristics of cytostatic agents (evaporation) and an investigation into protective glove permeation. In co-operation with IUTA (Institut für Energie- und Umwelttechnik e.V., Duisburg, Germany), the vapour pressure of paclitaxel, doxorubicin and dacarbazine was measured following OECD guideline No. 104: Vapour pressure curve--vapour pressure balance. Furthermore, the evaporation of cytostatic drugs was examined in actual laboratory conditions by monitoring the airborne concentration using the passive sampling technique. Besides the evaporation of selected drugs, the permeation of cisplatin, cyclophosphamide, doxorubicin, 5-fluorouracil and paclitaxel through different types of gloves (vinyl, latex, nitrile) was assessed. Although our experiments showed relatively slow evaporation of the evaluated cytostatic drugs (the highest pressure in paclitaxel was 0.024 Pa), equilibrium concentrations may go up to milligrams per cubic metre. Nevertheless, analytical measurements of airborne contamination did not confirm these concentration levels. The glove permeation experiments with cytostatics showed good resistance of nitrile gloves (which were impermeable to all five drugs). Other materials should be avoided while handling cytostatic agents (e.g. maximum permeation of cyclophosphamide through latex was 19 microg/sq cm/hr). Although the volatility of cytostatic agents is low, it cannot be neglected considering the chronic character of exposure. However, in order to estimate actual occupational exposure, future research should focus on the development of sensitive analytical

  17. Formulation and development of a methodology for selecting desulfurization processes, applicable to diluted sulfurous emissions from copper. Preparation of the engineering for a draft project using electron beam process, selected with this methodology

    International Nuclear Information System (INIS)

    Aros M, Patricia.

    1997-01-01

    A comparative study of clean desulfurization technologies was prepared. Sulfur abatement processes from S O 2 gas streams were analyzed in 21 processes grouped into 8 different types. Since there are a large number of potentially applicable processes, this thesis presents a process selection methodology based on a technical/economic analysis series, which produces a ranking by scores. Visual Basic 3.0 software was used to develop the program, which can be installed in any computer and uses Windows 95. Based on these results in Chilean Nuclear Energy Commission decided to present a draft project for electron beam technology. The full design and calculation for the humidifying and cooling tower was prepared together with the design of the remaining equipment for size, in order to estimate probable costs. The pre-feasibility evaluation determined that the process would generate profits, when the selling price of ammonium sulfate - which is a byproduct of the process that is used as fertilizer - is above US$ 110/ton. The process cost is heavily influenced by the capital cost of storage facilities, since a long term supply for ammonia reagent is needed. This product is imported in Chile and it is currently an expensive reagent. (author). 33 app., 7 tabs

  18. Perspectives on compliance: non-compliance with environmental licenses in the Netherlands

    NARCIS (Netherlands)

    van Snellenberg, A.H.L.M.; van de Peppel, R.A.

    2002-01-01

    Compliance with environmental law is not self-evident. In many instances enforcement of environmental regulations is a necessary means for achieving compliance. Assuming that an enforcement strategy, in order to be effective, has to fit the type of non-compliance, we integrate six different

  19. Tax Compliance Inventory: TAX-I Voluntary tax compliance, enforced tax compliance, tax avoidance, and tax evasion

    Science.gov (United States)

    Kirchler, Erich; Wahl, Ingrid

    2010-01-01

    Surveys on tax compliance and non-compliance often rely on ad hoc formulated items which lack standardization and empirical validation. We present an inventory to assess tax compliance and distinguish between different forms of compliance and non-compliance: voluntary versus enforced compliance, tax avoidance, and tax evasion. First, items to measure voluntary and enforced compliance, avoidance, and evasion were drawn up (collected from past research and newly developed), and tested empirically with the aim of producing four validated scales with a clear factorial structure. Second, findings from the first analyses were replicated and extended to validation on the basis of motivational postures. A standardized inventory is provided which can be used in surveys in order to collect data which are comparable across research focusing on self-reports. The inventory can be used in either of two ways: either in its entirety, or by applying the single scales independently, allowing an economical and fast assessment of different facets of tax compliance. PMID:20502612

  20. Nurses' perceptions of reasons for persistent low rates in hand hygiene compliance.

    Science.gov (United States)

    Sadule-Rios, Nohemi; Aguilera, Graciela

    2017-10-01

    The purpose of this study was to explore nurses' perceptions of reasons for persistent low rates in hand hygiene compliance in the Critical Care Unit and their recommendations for improvement. This study used an exploratory, descriptive survey design to identify critical care nurses' perceptions of barriers to hand hygiene compliance in the unit and their recommendations for improvement. Nurses selected high workload, understaffing and suggested lack of time as the main problems with hand hygiene compliance in the critical care unit. Second to that, they identified difficulty accessing sinks and lack of appropriately located hand sanitisers at the point of care complemented by suggestions of not enough sinks and inconveniently located hand sanitiser as major barriers to hand hygiene compliance. Results of this study indicate that high workload and understaffing added to difficulty accessing hand hygiene resources contribute to low rates of hand hygiene compliance in the critical care unit. Addressing nursing understaffing and workload and making some environmental modifications to allow easy access to sinks and hand sanitisers may facilitate nurses hand hygiene compliance in this setting. Further studies on the relationship between nurses' workload, unit staffing, and hand hygiene compliance rates are needed. Copyright © 2017 Elsevier Ltd. All rights reserved.