WorldWideScience

Sample records for company surry power

  1. Characterization of solid radwaste generated at Virginia Power's Surry and North Anna stations

    International Nuclear Information System (INIS)

    Lippard, D.W.; Elguindy, H.; Nelson, R.A.

    1987-01-01

    This paper describes the results of a study on characterization of the major constituents of the solid radwaste generated at Virginia Power's North Anna and Surry Power Stations. The characterization consisted of identifying the individual constituents of the dry active waste (DAW) and estimating the fraction of the total DAW (both weight and volume) made up by each constituent. The analysis of the characterization of solid waste streams generated at both North Anna and Surry stations has lead to recommending techniques for both source minimization and waste volume reduction

  2. 75 FR 80546 - Virginia Electric and Power Company; Surry Power Station Unit Nos. 1 and 2; Exemption

    Science.gov (United States)

    2010-12-22

    ... approved the use of Optimized ZIRLO TM as a fuel cladding material based on: (1) Similarities with standard... fuel rod cladding material at SURRY. This change to the plant configuration has no relation to security... granting of this exemption will not have a significant effect on the quality of the human environment as...

  3. Integrated outages increase Surry's availability

    International Nuclear Information System (INIS)

    Harms, S.R.; Downs, J.L.

    1995-01-01

    This article describes how, through Virginia Power's and Westinghouse's goal-oriented planning philosophy, teamwork and commitment, average outage duration has decreased significantly. During the past 10 years Virginia Power and its nuclear steam supply system (NSSS) services vendor, Westinghouse Electric Corp., have developed a working partnership with one goal in mind: increasing the availability and capacity factors of the North Anna and Surry nuclear power stations while driving down the operating costs of the plants. The outage integration program, steam generator maintenance agreement (SGMA), and integrated radiological services program form the core of this relationship and helped Virginia Power complete one of the most successful outages in Surry Power Station's operating history

  4. Surry Power Station, Units 1 and 2. Semiannual operating report, July--December 1974

    International Nuclear Information System (INIS)

    1974-01-01

    Net electric power generated by Surry Unit 1 was 6,930,353 MWH with the generator on line for 10,417.7 hours. Net electric power generated by Unit 2 was 5,699,299 MWH with the generator on line for 8,384.2 hours. Information is presented concerning operation, radioactive effluent releases, solid radioactive wastes, fuel shipments, occurrences in which temperature limitations on the condenser cooling water discharge were exceeded, changes in station organization, occupational personnel radiation exposure, nonradiological monitoring including thermal, physical, and biological programs, and the radiological environmental monitoring program. (U.S.)

  5. Steam generator replacement at Surry Power Station

    International Nuclear Information System (INIS)

    McKay, H.S.

    1982-01-01

    The purposes of the steam generator repair program at Surry Power Station were to repair the tube degradation caused by corrosion-related phenomena and to restore the integrity of the steam generators to a level equivalent to new equipment. The repair program consisted of (1) replacing the existing lower-shell assemblies with new ones and (2) adding new moisture separation equipment to the upper-shell assemblies. These tasks required that several pieces of reactor coolant piping, feedwater piping, main steam piping, and the steam generator be cut and refurbished for reinstallation after the new lower shell was in place. The safety implications and other potential effects of the repair program both during the repair work and after the unit was returned to power were part of the design basis of the repair program. The repair program has been completed on Unit 2 without any adverse effects on the health and safety of the general public or to the personnel engaged in the repair work. Before the Unit 1 repair program began, a review of work procedures and field changes for the Unit 2 repair was conducted. Several major changes were made to avoid recurrence of problems and to streamline procedures. Steam generator replacements was completed on June 1, 1981, and the unit is presently in the startup phase of the outrage

  6. An independent spent-fuel storage installation at Surry Station: Design and operation

    International Nuclear Information System (INIS)

    McKay, H.S.; Wakeman, B.H.; Pickworth, J.M.; Routh, S.D.; Hopkins, W.C.

    1989-07-01

    Design and licensing of the Surry Power Station Independent Spent Fuel Storage Installation (ISFSI) was initiated in 1982 by Virginia Power as part of a comprehensive strategy to increase spent fuel storage capacity at the Station. Designed to use large, metal dry storage casks, the Surry ISFSI will accommodate 84 such casks with a total storage capacity of 811 MTU of spent PWR fuel assemblies. The ISFSI is located at the Surry Station in a wooded area approximately 1000 meters (3300 feet) east of the reactor facilities. Construction of the first of three reinforced concrete storage pads and its associated support systems was completed in March 1986. The operating license and Technical Specifications were issued by the US NRC on July 2, 1986. Initial loading operations of a General Nuclear Systems, Inc., CASTOR V/21 storage cask began in September 1986. The first two CASTOR V/21 casks were placed in storage at the ISFSI in December 1986. 16 refs., 33 figs., 16 tabs

  7. Analysis of core damage frequency from internal events: Surry, Unit 1

    International Nuclear Information System (INIS)

    Harper, F.T.

    1986-11-01

    This document contains the accident sequence analyses for Surry, Unit 1; one of the reference plants being examined as part of the NUREG-1150 effort by the Nuclear Regulatory Commission (NRC). NUREG-1150 will document the risk of a selected group of nuclear power plants. As part of that work, this report contains the overall core damage frequency estimate for Surry, Unit 1, and the accompanying plant damage state frequencies. Sensitivity and uncertainty analyses provide additional insights regarding the dominant contributors to the Surry core damage frequency estimate. The numerical results are driven to some degree by modeling assumptions and data selection for issues such as reactor coolant pump seal LOCAs, common cause failure probabilities, and plant response to station blackout and loss of electrical bust initiators. The sensitivity studies explore the impact of alternate theories and data on these issues

  8. Critical evaluation of the nonradiological environmental technical specifications. Volume 2. Surry Power Plants, Units 1 and 2

    International Nuclear Information System (INIS)

    Adams, S.M.; Cunningham, P.A.; Gray, D.D.; Kumar, K.D.

    1976-01-01

    A comprehensive study of the data collected as part of the environmental Technical Specifications program for Units 1 and 2 of the Surry Nuclear Power Plant was carried out for the Office of Regulatory Research of the U.S. Nuclear Regulatory Commission. The program included an analysis of the hydrothermal and ecological monitoring data collected from 1973 through 1975. The hydrothermal analysis includes a discussion of models used in plume predictions prior to plant operation and an evaluation of the present hydrothermal monitoring program. The two primary methods used for temperature monitoring employ a fixed thermographs network and boat measurements. Review of data indicates that both the application and formulation of the hydrothermal monitoring program are inadequate to fully characterize the operation of the plant and the behavior of the thermal plume. Furthermore, there are no existing data that can be used to adequately verify or disprove the validity of the various Surry plume predictions. The ecological analysis includes validation of impacts predicted in the Final Environmental Statement using the operational monitoring data. Phytoplankton cell concentrations, chlorophyll a, and carbon-14 measurements were used to monitor changes in the primary producers. Densities of consumers (i.e., zooplankton, benthos, and fish) were sed to monitor changes in the primary producers. Models based on operating data were constructed to determine whether changes were occurring at each trophic level. Analysis of the monitoring data suggests that the thermal discharges at Surry are having a negative effect on the phytoplankton and zooplankton but are enhancing the benthic and nekton populations in the discharge area

  9. Solid radwaste characterization at surry and North Anna Power Stations

    International Nuclear Information System (INIS)

    Lippard, D.W.

    1987-01-01

    This paper describes a characterization of the solid radwaste generated at Virginia Power's North Anna and Surry power stations. The primary focus of this characterization was dry active waste (DAW). The characterization, covering the 21-month period from January 1985 through September 1986, was based on information in the station's health physics procurement records, radwaste shipping records, and from interviews with station personnel. The procurement records were the principal source of information for DAW. They were reviewed to determine the quantities of various materials, purchased during the study period, that were expected to become DAW. This provides an upper limit on the quantity in the waste for several major DAW components and a basis for the total amount of other components in the waste. The approach to characterizing DAW discussed in this paper could be implemented and regularly updated by utilizing a computerized procurement records system. If a use code (i.e., contaminated or noncontaminated) is associated with each stock requisition, a characterization could be performed by a computer run. This approach would help track minimization effort effectiveness and would refine the characterization of DAW considerably

  10. Results and insights of internal fire and internal flood analyses of the Surry Unit 1 Nuclear Power Plant during mid-loop operations

    International Nuclear Information System (INIS)

    Chu, Tsong-Lun; Musicki, Z.; Kohut, P.

    1995-01-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). The objectives of the program are to assess the risks of severe accidents initiated during plant operational states (POSs) other than full power operation and to compare the estimated core damage frequencies (CDFs), important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a Level 3 PRA for internal events and a Level 1 PRA for seismically induced and internal fire and flood induced core damage sequences. This paper summarizes the results and highlights of the internal fire and flood analysis documented in Volumes 3 and 4 of NUREG/CR-6144 performed for the Surry plant during mid-loop operation

  11. Design and operation of the Surry Radwaste Facility

    International Nuclear Information System (INIS)

    Morris, L.L.; Halverson, W.C.

    1993-01-01

    In September 1991, Virginia Power started processing radioactive waste with a new Radwaste Facility at the Surry Power Station near Norfolk, Virginia. The Surry Radwaste Facility (SRF) was designed to process and store liquid waste, laundry waste, dry active waste, radioactive filters and spent ion-exchange resin. It also provides on-site decontamination services and a fully equipped hot machine shop. The NRC has recognized that the amount of planning and design, and the attention to detail, that was expended on the SRF Project in order to minimize personnel exposure and ensure efficient operation, is a licensee strength. Through its first year of operation, the facility has proven very successful. Using evaporation and demineralization, over 30 million liters of liquid have been released with no chemical impurities or detectable radioactivity (excluding tritium). Over 623,000 liters of concentrated boric acid waste liquid have been processed with the Bitumen Solidification System yielding 139,880 liters (660 drums) of low level Class A-Stable waste. Additional economic benefits will be realized as the effectiveness of the processing systems continues to improve due to increased operational experience and ergonomics

  12. A scoping evaluation of severe accidents at Surry and Grand Gulf Nuclear Power Plants resulting from earthquakes during shutdown conditions

    International Nuclear Information System (INIS)

    Budnitz, R.J.; Davis, P.R.

    1991-01-01

    This report explores the likelihood of seismic-initiated core damage accidents during refueling shutdown conditions at two nuclear power plants, Surry Unit I and Grand Gulf Unit 1. The effort is scoping in character, and has been performed primarily to establish if a potential problem exists sufficient to justify a more rigorous and more quantitative evaluation. A summary is presented of the important conclusions that have been reached. The most important conclusion is that the core-damage frequencies for earthquake-initiated accidents during shutdown at both Surry Unit I and Grand Gulf Unit I are found to be low in absolute terms. The reasons for this are that in their ability to respond to earthquakes during shutdowns, the plants both have large seismic capacities, well above their design-basis levels; and also that both sites enjoy among the lowest seismic hazards of any LWR sites in the US

  13. Development of in-service inspection plans for nuclear components at the Surry 1 nuclear power station

    International Nuclear Information System (INIS)

    Vo, T.V.; Simonen, F.A.; Doctor, S.R.; Smith, B.W.; Gore, B.F.

    1993-01-01

    As part of the nondestructive evaluation reliability program sponsored by the US Nuclear Regulatory Commission at Pacific Northwest Laboratory, a methodology has been developed for establishing in-service inspection priorities of nuclear power plant components. The method uses results of probabilistic risk assessment in conjunction with the techniques of failure modes and effects analysis to identify and prioritize the most risk-important systems and components for inspection at nuclear power plants. Surry nuclear power station unit 1 was selected for demonstrating the methodology. The specific systems selected for analysis were the reactor pressure vessel, the reactor coolant, the low pressure injection including the accumulators, and the auxiliary feedwater. The results provide a risk-based ranking of components that can be used to establish a prioritization of the components and a basis for developing improved in-service inspection plans at nuclear power plants

  14. Intervention in independent spent fuel storage facility license application proceedings for storage on the power plant site

    International Nuclear Information System (INIS)

    Jordan, J.

    1992-01-01

    This presentation summarizes the intervention in the Nuclear Regulatory Commission (NRC) licensing process for currently operating Independent Spent fuel Storage Installation (ISFSI) projects at Carolina Power and Light's Company's H.B. Robinson, Duke Power Company's Oconee, and Virginia Power Company's Surry. In addition, intervention at dry storage facilities that are currently under development are also described. The utilities and reactors include Baltimore Gas and Electric Company's Calvert Cliffs, Public Service Company of Colorado's Fort St. Vrain plant, Northern States Power Company's Prairie Island, Wisconsin Electric Power Company's Point Beach, and Consumers Power Company's Palisades

  15. Evaluation of severe accident risks and the potential for risk reduction: Surry Power Station, Unit 1: Draft report for comment

    International Nuclear Information System (INIS)

    Benjamin, A.S.; Boyd, G.J.; Kunsman, D.M.; Murfin, W.B.; Williams, D.C.

    1987-02-01

    The Severe Accident Risk Reduction Program (SARRP) has completed a rebaselining of the risks to the public from a particular pressurized water reactor with a subatmospheric containment (Surry, Unit 1). Emphasis was placed on determining the magnitude and character of the uncertainties, rather than focusing on a point estimate. The risk-reduction potential of a set of proposed safety option backfits was also studied, and their costs and benefits were also evaluated. It was found that the risks from internal events are generally lower than previously evaluated in the Reactor Safety Study (RSS). However, certain unresolved issues (such as direct containment heating) caused the top of the uncertainty band to appear at a level that is comparable with the RSS point estimate. None of the postulated safety options appears to be cost effective for the Surry power plant. This work supports the Nuclear Regulatory Commission's assessment of severe accidents in NUREG-1150

  16. Evaluation of severe accident risks and the potential for risk reduction: Surry Power Station, Unit 1: Draft report for comment

    Energy Technology Data Exchange (ETDEWEB)

    Benjamin, A.S.; Boyd, G.J.; Kunsman, D.M.; Murfin, W.B.; Williams, D.C.

    1987-02-01

    The Severe Accident Risk Reduction Program (SARRP) has completed a rebaselining of the risks to the public from a particular pressurized water reactor with a subatmospheric containment (Surry, Unit 1). Emphasis was placed on determining the magnitude and character of the uncertainties, rather than focusing on a point estimate. The risk-reduction potential of a set of proposed safety option backfits was also studied, and their costs and benefits were also evaluated. It was found that the risks from internal events are generally lower than previously evaluated in the Reactor Safety Study (RSS). However, certain unresolved issues (such as direct containment heating) caused the top of the uncertainty band to appear at a level that is comparable with the RSS point estimate. None of the postulated safety options appears to be cost effective for the Surry power plant. This work supports the Nuclear Regulatory Commission's assessment of severe accidents in NUREG-1150.

  17. Integrated analysis of DCH in Surry

    International Nuclear Information System (INIS)

    Dingman, S.E.; Harper, F.T.; Pilch, M.M.; Washington, K.E.

    1993-01-01

    An evaluation of the key elements affecting Direct Containment Heating (DCH) was performed for the Surry plant. This involved determining the dominant high pressure core damage sequences, the probability of proceeding to vessel breach at high pressure, the DCH loads, and the containment strength. Each of these factors was evaluated separately, and then the results were combined to give the overall threat from DCH. The maximum containment failure probability by DCH for Surry is 10 -3 when considering four base DCH scenarios and using the two-cell equilibrium (TCE) model. However, higher contamination failure probabilities are estimated in sensitivity cases. When the depressurization and containment loads aspects are combined, the containment failure probability (conditional on station blackout sequence) is less than 19 -2 . CONTAIN calculations were performed to provide insights regarding DCH phenomenological uncertainties and potential conservatisms in the TCE model. The CONTAIN calculations indicated that the TCE calculations were conservative for Surry and that the dominant factors were neglect of heat transfer to surroundings and complete combustion of hydrogen on DCH time scales

  18. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal fires during mid-loop operations. Volume 3, Part 1, Main report

    International Nuclear Information System (INIS)

    Musicki, Z.; Chu, T.L.; Yang, J.; Ho, V.; Hou, Y.M.; Lin, J.; Siu, N.

    1994-07-01

    During l989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than fun power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in ' the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few. procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful

  19. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices A--D. Volume 2, Part 2

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the Potential risks during low Power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the Plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful. This document, Volume 2, Pt. 2 provides appendices A through D of this report

  20. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices A--D. Volume 2, Part 2

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Musicki, Z.; Kohut, P. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the Potential risks during low Power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the Plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful. This document, Volume 2, Pt. 2 provides appendices A through D of this report.

  1. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Main report (Chapters 7--12). Volume 2, Part 1B

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specific shutdown accidents would be useful

  2. Risk analysis of releases from accidents during mid-loop operation at Surry

    International Nuclear Information System (INIS)

    Jo, J.; Lin, C.C.; Nimnual, S.; Mubayi, V.; Neymotin, L.

    1992-11-01

    Studies and operating experience suggest that the risk of severe accidents during low power operation and/or shutdown (LP/S) conditions could be a significant fraction of the risk at full power operation. Two studies have begun at the Nuclear Regulatory Commission (NRC) to evaluate the severe accident progression from a risk perspective during these conditions: One at the Brookhaven National Laboratory for the Surry plant, a pressurized water reactor (PWR), and the other at the Sandia National Laboratories for the Grand Gulf plant, a boiling water reactor (BWR). Each of the studies consists of three linked, but distinct, components: a Level I probabilistic risk analysis (PRA) of the initiating events, systems analysis, and accident sequences leading to core damage; a Level 2/3 analysis of accident progression, fuel damage, releases, containment performance, source term and consequences-off-site and on-site; and a detailed Human Reliability Analysis (HRA) of actions relevant to plant conditions during LP/S operations. This paper summarizes the approach taken for the Level 2/3 analysis at Surry and provides preliminary results on the risk of releases and consequences for one plant operating state, mid-loop operation, during shutdown

  3. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Appendices E (Sections E.1--E.8). Volume 2, Part 3A

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1994-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. The authors recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown. Procedures written specifically for shutdown accidents would be useful

  4. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations, Main report (Chapters 1--6). Volume 2, Part 1A

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1992-06-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this report is to document the approach utilized in the Surry plant and discuss the results obtained. A parallel report for the Grand Gulf plant is prepared by SNL. This study shows that the core-damage frequency during mid-loop operation at the Surry plant is comparable to that of power operation. We recognize that there is very large uncertainty in the human error probabilities in this study. This study identified that only a few procedures are available for mitigating accidents that may occur during shutdown written specifically for shutdown accidents would be useful. This document presents Chapters 1--6 of the report

  5. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1. Volume 5: Analysis of core damage frequency from seismic events during mid-loop operations

    International Nuclear Information System (INIS)

    Budnitz, R.J.; Davis, P.R.; Ravindra, M.K.; Tong, W.H.

    1994-08-01

    In 1989 the US Nuclear Regulatory Commission (NRC) initiated an extensive program to examine carefully the potential risks during low-power and shutdown operations. The program included two parallel projects, one at Brookhaven National Laboratory studying a pressurized water reactor (Surry Unit 1) and the other at Sandia National Laboratories studying a boiling water reactor (Grand Gulf). Both the Brookhaven and Sandia projects have examined only accidents initiated by internal plant faults--so-called ''internal initiators.'' This project, which has explored the likelihood of seismic-initiated core damage accidents during refueling shutdown conditions, is complementary to the internal-initiator analyses at Brookhaven and Sandia. This report covers the seismic analysis at Surry Unit 1. All of the many systems modeling assumptions, component non-seismic failure rates, and human error rates that were used in the internal-initiator study at Surry have been adopted here, so that the results of the two studies can be as comparable as possible. Both the Brookhaven study and this study examine only two shutdown plant operating states (POSs) during refueling outages at Surry, called POS 6 and POS 10, which represent mid-loop operation before and after refueling, respectively. This analysis has been limited to work analogous to a level-1 seismic PRA, in which estimates have been developed for the core-damage frequency from seismic events during POSs 6 and 10. The results of the analysis are that the core-damage frequency of earthquake-initiated accidents during refueling outages in POS 6 and POS 10 is found to be low in absolute terms, less than 10 -6 /year

  6. Analysis of core damage frequency: Surry, Unit 1 internal events

    International Nuclear Information System (INIS)

    Bertucio, R.C.; Julius, J.A.; Cramond, W.R.

    1990-04-01

    This document contains the accident sequence analysis of internally initiated events for the Surry Nuclear Station, Unit 1. This is one of the five plant analyses conducted as part of the NUREG-1150 effort by the Nuclear Regulatory Commission. NUREG-1150 documents the risk of a selected group of nuclear power plants. The work performed and described here is an extensive of that published in November 1986 as NUREG/CR-4450, Volume 3. It addresses comments form numerous reviewers and significant changes to the plant systems and procedures made since the first report. The uncertainty analysis and presentation of results are also much improved. The context and detail of this report are directed toward PRA practitioners who need to know how the work was performed and the details for use in further studies. The mean core damage frequency at Surry was calculated to be 4.05-E-5 per year, with a 95% upper bound of 1.34E-4 and 5% lower bound of 6.8E-6 per year. Station blackout type accidents (loss of all AC power) were the largest contributors to the core damage frequency, accounting for approximately 68% of the total. The next type of dominant contributors were Loss of Coolant Accidents (LOCAs). These sequences account for 15% of core damage frequency. No other type of sequence accounts for more than 10% of core damage frequency. 49 refs., 52 figs., 70 tabs

  7. U.S. industry response to surry corrosion event

    International Nuclear Information System (INIS)

    Chexal, V.K.; Dietrich, E.B.; Torok, R.C.; Randall, G.A.; Shevde, V.C.; Horowitz, J.S.

    1990-01-01

    On December 9, 1986, a 460 mm (18 inch) diameter carbon steel elbow in the condensate system at Surry Unit-2 failed. The failure occurred as a consequence of thinning of the elbow by erosion-corrosion. Inspections revealed significant thinning of carbon steel sections at numerous locations in the condensate and feedwater piping of both Surry units. The subsequent discovery of thinning at other plants established erosion-corrosion as a generic issue for nuclear and fossil plants. To quickly resolve industry and regulatory concerns associated with single-phase erosion-corrosion, EPRI sought to: (1) find ways to determine where single phase erosion-corrosion is most likely to occur; (2) define accurate and low-cost inspection methods; and (3) identify techniques for preventing further pipe degradation. Erosion-corrosion programs have been conducted in a number of laboratories world-wide. The associated phenomena are complex and depend on the interrelationship of water temperature, water chemistry, component material, flow velocity and the geometry of the flow path (straight, bend, tee, etc.). EPRI supplemented existing data and developed technical products tailored for utility use on the erosion-corrosion issue. This paper describes the U.S. industry response to the Surry event and the related EPRI activities in the corrosion area

  8. Analysis of core damage frequency, Surry, Unit 1 internal events appendices

    International Nuclear Information System (INIS)

    Bertucio, R.C.; Julius, J.A.; Cramond, W.R.

    1990-04-01

    This document contains the appendices for the accident sequence analyses of internally initiated events for the Surry Nuclear Station, Unit 1. This is one of the five plant analyses conducted as part of the NUREG-1150 effort by the Nuclear Regulatory Commission. NUREG-1150 documents the risk of a selected group of nuclear power plants. The work performed is an extensive reanalysis of that published in November 1986 as NUREG/CR-4450, Volume 3. It addresses comments from numerous reviewers and significant changes to the plant systems and procedures made since the first report. The uncertainty analysis and presentation of results are also much improved. The context and detail of this report are directed toward PRA practitioners who need to know how the work was performed and the details for use in further studies. The mean core damage frequency at Surry was calculated to be 4.0E-5 per year, with a 95% upper bound of 1.3E-4 and 5% lower bound of 6.8E-6 per year. Station blackout type accidents (loss of all AC power) were the largest contributors to the core damage frequency, accounting for approximately 68% of the total. The next type of dominant contributors were Loss of Coolant Accidents (LOCAs). These sequences account for 15% of core damage frequency. No other type of sequence accounts for more than 10% of core damage frequency

  9. Approach and results of the PWR low power and shutdown accident frequencies program - Coarse screening analysis for Surry

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Luckas, W.; Wong, S.M.; Fitzpatrick, R.G.

    1991-01-01

    Traditionally, probabilistic risk analyses of severe accidents in nuclear power plants have limited themselves to consideration of the set of initiating events occurring during full power operation. However, some analyses of accident initiators during low power, shutdown, and other modes of plant operation other than full power have been performed. These studies as well as the Chernobyl accident and recent operating experience at US pressurized water reactors (PWRs) suggested that risks during low power and shutdown could be significant. As such, the analysis of the frequencies, consequences, and risks of these accidents was identified as one task in the Nuclear Regulatory Commission staff's study of the implications of the Chernobyl accident to US commercial nuclear power plants. This program is an ongoing high priority effort at Brookhaven National Laboratory (BNL). The scope includes a Level 1 probabilistic risk assessment (PRA) with internal fire and flood for Surry Unit 1 (PWR). This program is also closely coupled to a parallel project for the Grand Gulf plant (BWWR) being conducted by SNL. The program is being performed in two phases. Phase 1 represents a coarse screening analysis to identify dominant accident scenarios as well as risk dominant plant configurations and plant operating states. In Phase 2, a detailed PRA will be performed for the dominant accident scenarios/operating states identified in Phase 1. The objectives, results and insights of Phase 1 are discussed in the paper

  10. Virginia power nuclear power station engineer training program

    International Nuclear Information System (INIS)

    Williams, T.M.; Haberstroh-Timpano, S.

    1987-01-01

    In response to the Institute of Nuclear Power Operations (INPO) accreditation requirements for technical staff and manager, Virginia Power developed the Nuclear Power Station Engineer Training Programs (NPSETP). The NPSETP is directed toward enhancing the specific knowledge and skills of company engineers, especially newly hired engineers. The specific goals of the program are to promote safe and reliable plant operation by providing engineers and appropriate engineering technicians with (1) station-specific basic skills; (2) station-specific specialized skills in the areas of surveillance and test, plant engineering, nuclear safety, and in-service inspection. The training is designed to develop, maintain, and document through demonstration the required knowledge and skills of the engineers in the identified groups at North Anna and Surry Power Stations. The program responds to American National Standards Institute, INPO, and US Nuclear Regulatory Commission standards

  11. Comparison of CONTAIN and TCE calculations for direct containment heating of Surry

    International Nuclear Information System (INIS)

    Washington, K.E.; Stuart, D.S.

    1996-01-01

    This paper presents the results of several CONTAIN code calculations used to model direct containment heating (DCH) loads for the Surry plant. The results of these calculations are compared with the results obtained using the two-cell equilibrium (TCE) model for the same set of initial and boundary conditions. This comparison is important because both models have been favorably validated against the available DCH database, yet there are potentially important modeling differences. The comparisons are to quantitatively assess the impact of these differences. A major conclusion of this study is that, for the accident conditions studied and for a broad range of sensitivity cases, the peak pressures predicted by both TCE and CONTAIN are well below the failure pressure for the Surry containment. (orig.)

  12. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix I, Volume 2, Part 5

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J. [Brookhaven National Lab., Upton, NY (United States); Bley, D.; Johnson, D. [PLG Inc., Newport Beach, CA (United States); Holmes, B. [AEA Technology, Dorset (United Kingdom)] [and others

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Lab. (BNL) and Sandia National Labs. (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this volume of the report is to document the approach utilized in the level-1 internal events PRA for the Surry plant, and discuss the results obtained. A phased approach was used in the level-1 program. In phase 1, which was completed in Fall 1991, a coarse screening analysis examining accidents initiated by internal events (including internal fire and flood) was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis.

  13. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix I, Volume 2, Part 5

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Bley, D.; Johnson, D.; Holmes, B.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Lab. (BNL) and Sandia National Labs. (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The objective of this volume of the report is to document the approach utilized in the level-1 internal events PRA for the Surry plant, and discuss the results obtained. A phased approach was used in the level-1 program. In phase 1, which was completed in Fall 1991, a coarse screening analysis examining accidents initiated by internal events (including internal fire and flood) was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis

  14. A pilot application of risk-informed methods to establish inservice inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station. Revision 1

    International Nuclear Information System (INIS)

    Vo, T.V.; Phan, H.K.; Gore, B.F.; Simonen, F.A.; Doctor, S.R.

    1997-02-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest National Laboratory has developed risk-informed approaches for inservice inspection plans of nuclear power plants. This method uses probabilistic risk assessment (PRA) results to identify and prioritize the most risk-important components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot application of this methodology. This report, which incorporates more recent plant-specific information and improved risk-informed methodology and tools, is Revision 1 of the earlier report (NUREG/CR-6181). The methodology discussed in the original report is no longer current and a preferred methodology is presented in this Revision. This report, NUREG/CR-6181, Rev. 1, therefore supersedes the earlier NUREG/CR-6181 published in August 1994. The specific systems addressed in this report are the auxiliary feedwater, the low-pressure injection, and the reactor coolant systems. The results provide a risk-informed ranking of components within these systems

  15. Socio-economic impacts of nuclear generating stations: Surry case study

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    This report documents a case study of the socio-economic impacts of the construction and operation of the Surry nuclear power station. It is part of a major post-licensing study of the socio-economic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period 1980 to 1981. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of the construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socio-economic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  16. Fracture mechanics evaluation of feedwater line failure at Surry-2: Final report

    International Nuclear Information System (INIS)

    Zahoor, A.; Gamble, R.M.

    1987-10-01

    The purpose of this work was to perform a fracture mechanics evaluation of a failure that occurred in an elbow of the 18-inch suction line to the ''A'' main feed pump at Surry Power Station, Unit 2. The failure occurred during a pressure transient subsequent to a reactor trip, which was initiated by a low-low steam generator level protection signal. Analyses were performed to characterize the crack formation and growth sequence at the estimated failure pressure (550 psi) and normal operating pressure (367 psi); this work included predicting the longitudinal throughwall crack lengths for initial wall breakthrough and failure. A sensitivity study also was performed to assess the effect on the results of variations in several conditions that generally influence failure

  17. Fracture mechanics evaluation of feedwater line failure at Surry-2: Final report

    Energy Technology Data Exchange (ETDEWEB)

    Zahoor, A.; Gamble, R.M.

    1987-10-01

    The purpose of this work was to perform a fracture mechanics evaluation of a failure that occurred in an elbow of the 18-inch suction line to the ''A'' main feed pump at Surry Power Station, Unit 2. The failure occurred during a pressure transient subsequent to a reactor trip, which was initiated by a low-low steam generator level protection signal. Analyses were performed to characterize the crack formation and growth sequence at the estimated failure pressure (550 psi) and normal operating pressure (367 psi); this work included predicting the longitudinal throughwall crack lengths for initial wall breakthrough and failure. A sensitivity study also was performed to assess the effect on the results of variations in several conditions that generally influence failure.

  18. CONTAIN calculations of direct containment heating in the Surry plant

    International Nuclear Information System (INIS)

    Williams, D.C.; Louie, D.L.Y.

    1988-01-01

    The draft NUREG-1150 risk analysis performed for the Surry plant identified direct containment heating (DCH) as a potentially dominant contributor to the total public risk associated with this plant. At that time, however, detailed mechanistic calculations of DCH loads were unavailable. Subsequently, a series of analyses of DCH scenarios using the CONTAIN-DCH code was performed in order to put the treatment of DCH on a firmer basis in the final draft of NUREG-1150. The present paper describes some of the results obtained for the Surry plant. A developmental model for DCH has been incorporated into CONTAIN code. This model includes mechanistic treatments of reasonably well-understood phenomena (e.g., heat and mass transfer), together with a parametric treatment of poorly understood phenomena for which mechanistic models are unavailable (e.g., debris de-entrainment from the gas stream due to debris-structure interactions). The DCH model was described in an earlier report, but the present version incorporates a number of advances, including treatment of the chemical equilibria involved in the iron-steam reaction

  19. Surry Power Station secondary water chemistry improvement since steam generator replacement and the unit two feedwater pipe rupture

    International Nuclear Information System (INIS)

    Swindell, E.T.

    1988-01-01

    Surry Power Station has two Westinghouse-designed three-loop PWRs of 811 MWe design rating. The start of commercial operation was in July, 1972 in No.1 plant, and May, 1973 in No.2 plant. Both plants began the operation using controlled phosphate chemistry for the steam generators. In 1975, both plants were converted to all volatile treatment on the secondary side due to the tube wall thinning corrosion in the steam generators, which was associated with the phosphate sludge that was building up on the tube sheets and created acidic condition. Thereafter, condenser and air leakage and steam generator denting occurred, and after the operation of 8 years 2 month of No.1 plant and 5 years 9 months of No.2 plant, the steam generators were replaced. A major plant improvement program was designed and implemented from 1979 to 1980. The improvement in new steam generators, the modification for preventing corrosion, the addition of a steam generator blowdown recovery system, the reconstruction of condensers, the installation of full flow, deep bed condensate polishers, the addition of Dionex 8,000 on-line ion chromatograph, a long term maintenance agreement with Westinghouse and so on are reported. (Kako, I.)

  20. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal floods during mid-loop operations. Volume 4

    International Nuclear Information System (INIS)

    Kohut, P.

    1994-07-01

    The major objective of the Surry internal flood analysis was to provide an improved understanding of the core damage scenarios arising from internal flood-related events. The mean core damage frequency of the Surry plant due to internal flood events during mid-loop operations is 4.8E-06 per year, and the 5th and 95th percentiles are 2.2E-07 and 1.8E-05 per year, respectively. Some limited sensitivity calculations were performed on three plant improvement options. The most significant result involves modifications of intake-level structure on the canal, which reduced core damage frequency contribution from floods in mid-loop by about 75%

  1. Power companies international year book 1997

    International Nuclear Information System (INIS)

    Anon.

    1996-12-01

    The Power Companies International Yearbook covers around 250 major international power generating and distributing companies worldwide, giving a comprehensive overview of this dynamic global industry. Both publicly and privately owned companies are features. It details financial performance, ownership status, affiliated businesses, activities, operations, key personnel, type/capacity of generation, subsidiary activities and plans for diversification within and outside the global power sector. (Author)

  2. Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1

    International Nuclear Information System (INIS)

    Chu, T.L.; Pratt, W.T.

    1995-10-01

    This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144

  3. Evaluation of potential severe accidents during low power and shutdown operations at Surry: Unit 1, Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Pratt, W.T. [eds.; Musicki, Z. [Brookhaven National Lab., Upton, NY (United States)

    1995-10-01

    This document contains a summarization of the results and insights from the Level 1 accident sequence analyses of internally initiated events, internally initiated fire and flood events, seismically initiated events, and the Level 2/3 risk analysis of internally initiated events (excluding fire and flood) for Surry, Unit 1. The analysis was confined to mid-loop operation, which can occur during three plant operational states (identified as POSs R6 and R10 during a refueling outage, and POS D6 during drained maintenance). The report summarizes the Level 1 information contained in Volumes 2--5 and the Level 2/3 information contained in Volume 6 of NUREG/CR-6144.

  4. A pilot application of risk-based methods to establish in-service inspection priorities for nuclear components at Surry Unit 1 Nuclear Power Station

    International Nuclear Information System (INIS)

    Vo, T.; Gore, B.; Simonen, F.; Doctor, S.

    1994-08-01

    As part of the Nondestructive Evaluation Reliability Program sponsored by the US Nuclear Regulatory Commission, the Pacific Northwest Laboratory is developing a method that uses risk-based approaches to establish in-service inspection plans for nuclear power plant components. This method uses probabilistic risk assessment (PRA) results and Failure Modes and Effects Analysis (FEMA) techniques to identify and prioritize the most risk-important systems and components for inspection. The Surry Nuclear Power Station Unit 1 was selected for pilot applications of this method. The specific systems addressed in this report are the reactor pressure vessel, the reactor coolant, the low-pressure injection, and the auxiliary feedwater. The results provide a risk-based ranking of components within these systems and relate the target risk to target failure probability values for individual components. These results will be used to guide the development of improved inspection plans for nuclear power plants. To develop inspection plans, the acceptable level of risk from structural failure for important systems and components will be apportioned as a small fraction (i.e., 5%) of the total PRA-estimated risk for core damage. This process will determine target (acceptable) risk and target failure probability values for individual components. Inspection requirements will be set at levels to assure that acceptable failure probabilistics are maintained

  5. Risk contribution from low power, shutdown, and other operational modes beyond full power

    Energy Technology Data Exchange (ETDEWEB)

    Whitehead, D.W.; Brown, T.D. [Sandia National Labs., Albuquerque, NM (United States); Chu, T.L. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1995-04-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (a pressurized water reactor) and Grand Gulf (a boiling water reactor), were selected for study by Brookhaven National Laboratory and Sandia National Laboratories, respectively. The program objectives included assessing the risks of severe accidents initiated during plant operational states other than full power and comparing estimated core damage frequencies, important accident sequences, and other qualitative and quantitative results with full power accidents as assessed in NUREG-1150. The scope included a Level 3 probabilistic risk assessment (PRA) for traditional internal events and a Level 1 PRA on fire, flooding, and seismically induced core damage sequences. A phased approach was used in Level 1. In Phase 1 the concept of plant operational states (POSs) was developed to provide a better representation of the plant as it transitions from power to nonpower operation. This included a coarse screening analysis of all POSs to identify vulnerable plant configurations, to characterize (on a high, medium, or low basis) potential frequencies of core damage accidents, and to provide a foundation for a detailed Phase 2 analysis. In Phase 2, selected POSs from both Grand Gulf and Surry were chosen for detailed analysis. For Grand Gulf, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected. For Surry, three POSs representing the time the plant spends in midloop operation were chosen for analysis. These included POS 6 and POS 10 of a refueling outage and POS 6 of a drained maintenance outage. Level 1 and Level 2/3 results from both the Surry and Grand Gulf analyses are presented.

  6. Risk contribution from low power, shutdown, and other operational modes beyond full power

    International Nuclear Information System (INIS)

    Whitehead, D.W.; Brown, T.D.; Chu, T.L.; Pratt, W.T.

    1995-01-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (a pressurized water reactor) and Grand Gulf (a boiling water reactor), were selected for study by Brookhaven National Laboratory and Sandia National Laboratories, respectively. The program objectives included assessing the risks of severe accidents initiated during plant operational states other than full power and comparing estimated core damage frequencies, important accident sequences, and other qualitative and quantitative results with full power accidents as assessed in NUREG-1150. The scope included a Level 3 probabilistic risk assessment (PRA) for traditional internal events and a Level 1 PRA on fire, flooding, and seismically induced core damage sequences. A phased approach was used in Level 1. In Phase 1 the concept of plant operational states (POSs) was developed to provide a better representation of the plant as it transitions from power to nonpower operation. This included a coarse screening analysis of all POSs to identify vulnerable plant configurations, to characterize (on a high, medium, or low basis) potential frequencies of core damage accidents, and to provide a foundation for a detailed Phase 2 analysis. In Phase 2, selected POSs from both Grand Gulf and Surry were chosen for detailed analysis. For Grand Gulf, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected. For Surry, three POSs representing the time the plant spends in midloop operation were chosen for analysis. These included POS 6 and POS 10 of a refueling outage and POS 6 of a drained maintenance outage. Level 1 and Level 2/3 results from both the Surry and Grand Gulf analyses are presented

  7. Accident tolerant clad material modeling by MELCOR: Benchmark for SURRY Short Term Station Black Out

    International Nuclear Information System (INIS)

    Wang, Jun; Mccabe, Mckinleigh; Wu, Lei; Dong, Xiaomeng; Wang, Xianmao; Haskin, Troy Christopher; Corradini, Michael L.

    2017-01-01

    Highlights: • Thermo-physical and oxidation kinetics properties calculation and analysis of FeCrAl. • Properties modelling of FeCrAl in MELCOR. • Benchmark calculation of Surry nuclear power plant. - Abstract: Accident tolerant fuel and cladding materials are being investigated to provide a greater resistance to fuel degradation, oxidation and melting if long-term cooling is lost in a Light Water Reactor (LWR) following an accident such as a Station Blackout (SBO) or Loss of Coolant Accident (LOCA). Researchers at UW-Madison are analyzing an SBO sequence and examining the effect of a loss of auxiliary feedwater (AFW) with the MELCOR systems code. Our research work considers accident tolerant cladding materials (e.g., FeCrAl alloy) and their effect on the accident behavior. We first gathered the physical properties of this alternative cladding material via literature review and compared it to the usual zirconium alloys used in LWRs. We then developed a model for the Surry reactor for a Short-term SBO sequence and examined the effect of replacing FeCrAl for Zircaloy cladding. The analysis uses MELCOR, Version 1.8.6 YR, which is developed by Idaho National Laboratory in collaboration with MELCOR developers at Sandia National Laboratories. This version allows the user to alter the cladding material considered, and our study examines the behavior of the FeCrAl alloy as a substitute for Zircaloy. Our benchmark comparisons with the Sandia National Laboratory’s analysis of Surry using MELCOR 1.8.6 and the more recent MELCOR 2.1 indicate good overall agreement through the early phases of the accident progression. When FeCrAl is substituted for Zircaloy to examine its performance, we confirmed that FeCrAl slows the accident progression and reduce the amount of hydrogen generated. Our analyses also show that this special version of MELCOR can be used to evaluate other potential ATF cladding materials, e.g., SiC as well as innovative coatings on zirconium cladding

  8. Accident tolerant clad material modeling by MELCOR: Benchmark for SURRY Short Term Station Black Out

    Energy Technology Data Exchange (ETDEWEB)

    Wang, Jun, E-mail: jwang564@wisc.edu [College of Engineering, The University of Wisconsin-Madison, Madison 53706 (United States); Mccabe, Mckinleigh [College of Engineering, The University of Wisconsin-Madison, Madison 53706 (United States); Wu, Lei [Institute of Nuclear and New Energy Technology, Tsinghua University, Beijing 100084 (China); Dong, Xiaomeng [College of Engineering, The University of Wisconsin-Madison, Madison 53706 (United States); Wang, Xianmao [Institute of Nuclear and New Energy Technology, Tsinghua University, Beijing 100084 (China); Haskin, Troy Christopher [College of Engineering, The University of Wisconsin-Madison, Madison 53706 (United States); Corradini, Michael L., E-mail: corradini@engr.wisc.edu [College of Engineering, The University of Wisconsin-Madison, Madison 53706 (United States)

    2017-03-15

    Highlights: • Thermo-physical and oxidation kinetics properties calculation and analysis of FeCrAl. • Properties modelling of FeCrAl in MELCOR. • Benchmark calculation of Surry nuclear power plant. - Abstract: Accident tolerant fuel and cladding materials are being investigated to provide a greater resistance to fuel degradation, oxidation and melting if long-term cooling is lost in a Light Water Reactor (LWR) following an accident such as a Station Blackout (SBO) or Loss of Coolant Accident (LOCA). Researchers at UW-Madison are analyzing an SBO sequence and examining the effect of a loss of auxiliary feedwater (AFW) with the MELCOR systems code. Our research work considers accident tolerant cladding materials (e.g., FeCrAl alloy) and their effect on the accident behavior. We first gathered the physical properties of this alternative cladding material via literature review and compared it to the usual zirconium alloys used in LWRs. We then developed a model for the Surry reactor for a Short-term SBO sequence and examined the effect of replacing FeCrAl for Zircaloy cladding. The analysis uses MELCOR, Version 1.8.6 YR, which is developed by Idaho National Laboratory in collaboration with MELCOR developers at Sandia National Laboratories. This version allows the user to alter the cladding material considered, and our study examines the behavior of the FeCrAl alloy as a substitute for Zircaloy. Our benchmark comparisons with the Sandia National Laboratory’s analysis of Surry using MELCOR 1.8.6 and the more recent MELCOR 2.1 indicate good overall agreement through the early phases of the accident progression. When FeCrAl is substituted for Zircaloy to examine its performance, we confirmed that FeCrAl slows the accident progression and reduce the amount of hydrogen generated. Our analyses also show that this special version of MELCOR can be used to evaluate other potential ATF cladding materials, e.g., SiC as well as innovative coatings on zirconium cladding

  9. Study Of Morphological Changes Of Uterine Horn Of Surri Mouse Depended To Morphine Before Puberty And DuringPuberty

    Directory of Open Access Journals (Sweden)

    Shadkhast M

    2003-11-01

    Full Text Available : Morphine is the most important alkaloid of opium family which is found as much as ten percent in opium, and is in two types the sulfate morphine and the hydrochloride morphine."nMaterials and Methods: In this study morphological changes of uterus of surri mice due to oral consumption of sulfate morphine were studied. It was shown that, female surri mice following gradually increasing of morphine to water (0.1 and 0.01 mg/ml were depended to morphine. Female surri mice were classified in two age groups before puberty and depended to morphine during puberty. Each age group took morphine for 21 days. After finishing the period, the mice anesthetizing were weighted, then were anesthetizing and uterus was studied the length, width and apparent features."nResults&ConcIusion: In this study it was distinguished that length and width of uterine horn, between experimental and control groups, were significant (P< 0.01. Morphological changes such as anemia, the thinness and fragitidily walls of uterus and filiformity of uterine horns were observed."n"n"n"n"n"n 

  10. The Canadian Niagara Power Company story

    International Nuclear Information System (INIS)

    Ball, N.R.

    2005-01-01

    This book chronicles the history and contributions of the Canadian Niagara Power Company and its employees toward the establishment of electricity generation and distribution in Niagara Falls and Fort Erie, Ontario, dating back to its founding in 1892. Through historical photographs, maps and drawings, the book demonstrates the impact of electricity on the Niagara region. It emphasizes the many skills and jobs required to run the company that generated electricity and maintained a complete system to deliver power, metering, and billing services through the depression, wars, and postwar booms, even during lightning, snow and ice storms. The company began producing power in 1905 with what had been the world's largest-capacity turbines and generators that supplied power to both sides of the Niagara River. Initially, most of the electricity was exported to New York State. The company eventually expanded its Canadian customer service area from Niagara Falls, Ontario, to Fort Erie, Bridgeburg, Amigari, Ridgeway, Stevensville, Crystal Beach and Point Abino. Throughout its history, the Canadian Niagara Power Company provided power at a lower cost than its neighbouring competitors. The William Birch Rankine Generating Station became an important tourist attraction, showcasing the latest electrical appliances of the time in an effort to promote the use of electricity in homes and offices. Today, the station remains a tribute to the fact that natural beauty can coincide with industry. The book also chronicles the difficult business challenges caused by restructuring in the electric power industry in the 1990s, repairing aging equipment and applying the latest in automation and remote sensing technology. Today, the company as FortisOntario is expanding to other communities around Ontario. refs., tabs., figs

  11. Dry cask storage: a Vepco/DOE/EPRI cooperative demonstration program

    International Nuclear Information System (INIS)

    Smith, M.L.

    1984-01-01

    In response to a Department of Energy (DOE) Solicitation for Cooperative Agreement Proposal, Virginia Electric and Power Company (Vepco) proposed to participate in a spent fuel storage demonstration program utilizing the dry cask storage technology. This proposed program includes dry cask storage at Vepco's Surry Nuclear Power Station and research and development activities at a DOE site in support of the licensed program at Surry. Phase I of Vepco's two-phase program involves a demonstration of the licensed dry cask storage of spent fuel in an inert atmosphere at the Surry Power Station site. Phase II of Vepco's proposed program will involve the demonstration of storing unconsolidated and consolidated spent fuel in dry casks filled only with air. This phase of the program will involve DOE site testing similar to Phase I and is expected to require an additional (fourth) cask to demonstrate storage of unconsolidated spent fuel in air-filled casks

  12. Nuclear power company activity based costing management analysis

    International Nuclear Information System (INIS)

    Xu Dan

    2012-01-01

    With Nuclear Energy Industry development, Nuclear Power Company has the continual promoting stress of inner management to the sustainable marketing operation development. In view of this, it is very imminence that Nuclear Power Company should promote the cost management levels and built the nuclear safety based lower cost competitive advantage. Activity based costing management (ABCM) transfer the cost management emphases from the 'product' to the 'activity' using the value chain analysis methods, cost driver analysis methods and so on. According to the analysis of the detail activities and the value chains, cancel the unnecessary activity, low down the resource consuming of the necessary activity, and manage the cost from the source, achieve the purpose of reducing cost, boosting efficiency and realizing the management value. It gets the conclusion from the detail analysis with the nuclear power company procedure and activity, and also with the selection to 'pieces analysis' of the important cost related project in the nuclear power company. The conclusion is that the activities of the nuclear power company has the obviously performance. It can use the management of ABC method. And with the management of the procedure and activity, it is helpful to realize the nuclear safety based low cost competitive advantage in the nuclear power company. (author)

  13. Risk contribution from low power and shutdown of a pressurized water reactor

    International Nuclear Information System (INIS)

    Chu, T.L.; Pratt, W.T.

    1997-01-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (a pressurized water reactor) and Grand Gulf (a boiling water reactor), were selected for study by Brookhaven National Laboratory and Sandia National Laboratories, respectively. The program objectives included assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing estimated core damage frequencies, important accident sequences, and other qualitative and quantitative results with full power accidents as assessed in NUREG-1150. The scope included a Level 3 PRA for traditional internal events and a Level 1 PRA on fire, flooding, and seismically induced core damage sequences. A phased approach was used in Level 1. In Phase 1 the concept of plant operational states (POSs) was developed to provide a better representation of the plant as it transitions from power to non power operation. This included a coarse screening analysis of all POSs to identify vulnerable plant configurations, to characterize (on a high, medium, or low basis) potential frequencies of core damage accidents, and to provide a foundation for a detailed Phase 2 analysis. In Phase 2, selected POSs from both Grand Gulf and Surry were chosen for detailed analysis. For Grand Gulf, POS 5 (approximately Cold Shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected. For Surry, three POSs representing the time the plant spends in mid loop operation were chosen for analysis. Level 1 and Level 2/3 results from the Surry analyses are presented

  14. 77 FR 2972 - Thunder Bay Power Company, Thunder Bay Power, LLC, et al.

    Science.gov (United States)

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Thunder Bay Power Company, Thunder Bay Power, LLC, et al.; Notice of Application for Transfer of Licenses, and Soliciting Comments and Motions To Intervene Thunder Bay Power Company Project No. 2404-095 Thunder Bay Power, LLC Midwest Hydro, Inc...

  15. Surry steam generator - examination and evaluation

    International Nuclear Information System (INIS)

    Clark, R.A.; Doctor, P.G.; Ferris, R.H.

    1985-10-01

    This report summarizes research conducted during the fourth year of the five year Steam Generator Group Project. During this period the project conducted numerous nondestructive examination (NDE) round robin inspections of the original Surry 2A steam generator. They included data acquisition/analysis and analysis-only round robins using multifrequency bobbin coil eddy current tests. In addition, the generator was nondestructively examined by alternate or advanced techniques including ultrasonics, optical fiber, profilometry and special eddy current instrumentation. The round robin interpretation data were compared. To validate the NDE results and for tube integrity testing, a selection of tubing samples, determined to be representative of the generator, was designated for removal. Initial sample removals from the generator included three sections of tube sheet, two sections of support plate and encompassed tubes, and a number of straight and U-bend tubing sections. Metallographic examination of these sections was initiated. Details of significant results are presented in the following paper. 13 figs

  16. Surry steam generator - examination and evaluation

    Energy Technology Data Exchange (ETDEWEB)

    Clark, R A; Doctor, P G; Ferris, R H

    1987-01-01

    This report summarizes research conducted during the fourth year of the five year Steam Generator Group Project. During this period the project conducted numerous nondestructive examination (NDE) round robin inspections of the original Surry 2A steam generator. They included data acquisition/analysis and analysis-only round robins using multifrequency bobbin coil eddy current tests. In addition, the generator was nondestructively examined by alternate or advanced techniques including ultrasonics, optical fiber, profilometry and special eddy current instrumentation. The round robin interpretation data were compared. To validate the NDE results and for tube integrity testing, a selection of tubing samples, determined to be representative of the generator, was designated for removal. Initial sample removals from the generator included three sections of tube sheet, two sections of support plate and encompassed tubes, and a number of straight and U-bend tubing sections. Metallographic examination of these sections was initiated. Details of significant results are presented in the following paper.

  17. Recreation Carrying Capacity Facts and Considerations. Report 11. Surry Mountain Lake Project Area.

    Science.gov (United States)

    1980-07-01

    contributions of practical experience and knowledge , along with their assistance in arranging schedules, have made this carrying capacity research effort...This survey obtained six responses from boaters and water- skiers . 29 A~ .~ ~ ~ ~ ~ ~ ~ ~~~~~~~PEEI PAG ... ._DIAN.K+.+.+ 3+ ,.+ -,++ + _-NO FILM...User characteristics Table 17 indicates the characteristics of the boaters and water- skiers surveyed at Surry. The small sample size at

  18. Power Company No 2. Activity Report 1992 - 1994

    International Nuclear Information System (INIS)

    1995-01-01

    The Power Company No.2 is in charge of power generation and distribution for the southern area of Vietnam. Status and development plans of the Company is presented in the report. (NHA). 10 figs, 2 tabs, 17 photos, 2 maps

  19. Socioeconomic impacts of nuclear generating stations: Surry case study. Technical report 1 Oct 78-4 Jan 82

    International Nuclear Information System (INIS)

    Flynn, J.

    1982-07-01

    The report documents a case study of the socioeconomic impacts of the construction and operation of the Surry nuclear power station. It is part of a major post-licensing study of the socioeconomic impacts at twelve nuclear power stations. The case study covers the period beginning with the announcement of plans to construct the reactor and ending in the period, 1980-81. The case study deals with changes in the economy, population, settlement patterns and housing, local government and public services, social structure, and public response in the study area during the construction/operation of the reactor. A regional modeling approach is used to trace the impact of construction/operation on the local economy, labor market, and housing market. Emphasis in the study is on the attribution of socioeconomic impacts to the reactor or other causal factors. As part of the study of local public response to the construction/operation of the reactor, the effects of the Three Mile Island accident are examined

  20. Environmental impact assessment. Ajka Mining and Power Company

    International Nuclear Information System (INIS)

    Sipkema, Arjan; De Visser, Petra

    1994-01-01

    An Environmental Impact Assessment (EIA) is a public document which evaluates the impact of a new company or a new project on the environment and it also lays out the possible alternatives. The present EIA was worked out to get an insight into the polluting effects of the Ajka Mining and Power Company in Ajka, Hungary and to understand what hinders the abatement of the pollution. The Ajka coal has a high sulphur content and is slightly radioactive. The Power Plant is situated in the neighborhood of the town Ajka and the wind usually blows the releases in the direction of the town. The radioactive sludge is also stored at the border of the town and its radioactivity exceeds the limit set for the Paks Power Plant (in Hungary). Alternatives for the present technology are explored. Nil-condensation and/or energy conservation seem to be the best alternatives. Theoretically, the Regional Environmental Inspectorate is responsible for all survey of pollution, which they monitor with their own equipment, with data obtained from the company or from other monitoring companies. However, the pollution of the Ajka Mining and Power Company is not completely monitored. (authors)

  1. Time and dose assessment of barge shipment and at-reactor handling of a CASTOR V/21 spent fuel storage cask

    Energy Technology Data Exchange (ETDEWEB)

    Hostick, C.J. (Pacific Northwest Lab., Richland, WA (United States)); Lavender, J.C. (Westinghouse Hanford Co., Richland, WA (United States)); Wakeman, B.H. (Virginia Electric and Power Co., Richmond, VA (United States))

    1992-04-01

    This report contains the results of a time/motion analysis and a radiation dose assessment made during the receipt from barge transport and the loading of CAst iron cask for Storage and Transport Of Radioactive material (CASTOR) V/21 storage casks with spent nuclear fuel at the Surry Power Station in Virginia during 1987. The study was a cooperative effort between Pacific Northwest Laboratory (PNL) and Virginia Electric and Power Company (Virginia Power), and was funded by the US Department of Energy (DOE) Transportation Program Office. In this study, cask handling activities were tracked at the Surry Power Station, tracing the transfer of the empty spent fuel storage cask from an ocean-going vessel to a barge for river transport through the activities required to place the loaded storage cask at an at-reactor storage location.

  2. Chapter 3. The economical power of the company

    International Nuclear Information System (INIS)

    1998-01-01

    In the third chapter of this CD ROM the economic power of the Slovak Electric, Plc. (Slovenske elektrarne, a.s.), is presented. It consist of next paragraphs (1) Property of Slovak Electric, Plc, the company; (2) Position of the Company; (3) Business performance of the Company (Economic results, Installed capacity, Generation of electricity and heat; Electricity trade, Distribution of electricity and heat trade are reviewed); (4) Shareholdings in other companies and international co-operation

  3. Virginia Power thermal-hydraulics methods

    International Nuclear Information System (INIS)

    Anderson, R.C.; Basehore, K.L.; Harrell, J.R.

    1987-01-01

    Virginia Power's nuclear safety analysis group is responsible for the safety analysis of reload cores for the Surry and North Anna power stations, including the area of core thermal-hydraulics. Postulated accidents are evaluated for potential departure from nucleate boiling violations. In support of these tasks, Virginia Power has employed the COBRA code and the W-3 and WRB-1 DNB correlations. A statistical DNBR methodology has also been developed. The code, correlations and statistical methodology are discussed

  4. Virginia Power and Department of Energy spent fuel transportation experience

    International Nuclear Information System (INIS)

    Ruska, M.D.; Schoonen, D.H.

    1986-12-01

    Spent fuel assemblies for the Spent Fuel Storage Cask Testing Program conducted by EG and G Idaho, Inc., at the Idaho National Engineering Laboratory (INEL) were transported to the INEL. A total of 69 spent fuel assemblies (23 shipments) were shipped from Virginia Power's nuclear power plant at Surry, Virginia, to the INEL between July 1985 and June 1986 to fill and test three spent fuel storage casks. The shipments were made over the highway system in Transnuclear, Inc., TN-8L shipping casks on specially constructed trailers. The shipments were moved by diesel tractors owned and operated by Tri-State Motor Transit Company of Joplin, Missouri. The gross vehicle weight for each shipment was 112,000 lb, which was a major consideration when selecting routes for the shipments. Cooperative negotiations with officials for the 17 states involved obtained authorization to transport through their states. The shipping campaign was successfully completed through close communication and cooperation and careful planning and operation by all organizations involved

  5. Project management for the Virginia power spent fuel storage project

    International Nuclear Information System (INIS)

    Smith, M.

    1992-01-01

    Like Duke Power, Virginia Power has been involved in spent fuel storage expansion studies for a long time - possibly a little longer than Duke Power. Virginia Power's initial studies date back to the late 70s and into the early 80s. Large variety of storage techniques are reviewed including reracking and transshipment. Virginia Power also considered construction a new spent fuel pool. This was one of the options that was considered early on since Virginia Power started this process before any dry storage techniques had been proven. Consolidation of spent fuel is something that was also studied. Finally, construction of dry storage facility was determined to be the technology of choice. They looked a large variety of dry storage technologies and eventually selected dry storage in metal casks at Surry. There are many of reasons why a utility may choose one technology over another. In Virginia Power's situation, additional storage was needed at Surry much earlier than at other utilities. Virginia Power was confronted with selecting a storage technique and having to be a leader in that it was the first U.S. utility to implement a dry storage system

  6. Virginia Power's nuclear operations: Leading by example

    International Nuclear Information System (INIS)

    Kuehn, S.E.

    1995-01-01

    Success has been a long time coming for Virginia Power's nuclear units, but after a record run and some of the shortest refueling outages ever, the rest of the industry could learn a few things. This article describes the changes made by Virginia Power at its Surry and North Anna plants. Virginia Power's recipe for success called for equal amounts of individual initiative, management savvy, engineering discipline, organization, dedication, perseverance, pride, introspection, motivation, and humility

  7. Human reliability analysis in support of a level 1 PRA for Surry during midloop operations

    International Nuclear Information System (INIS)

    Lin, J.C.; Bley, D.C.; Chu, T.-L.

    2004-01-01

    The objectives of this Level 1 probabilistic risk assessment (PRA) are to evaluate the important accident sequences initiated during midloop operations and to compare the qualitative and quantitative results with those for accidents initiated during power operations. The primary types of human actions analyzed in this study involve the dynamic operator actions and recovery actions that take place during the accident sequence following an initiating event. Two parts of the human actions were analyzed: failure to diagnose and failure to perform the action. The scope of the Level 1 PRA for Surry during midloop operations includes internal, fire, and flood initiating events. The major categories of dynamic operator actions taken during the accident sequence following an initiating event are: providing makeup to the reactor coolant system (RCS), restoring residual heat removal (RHR) cooling, establishing steam generator reflux cooling, establishing primary feed and spill, establishing gravity feed from refueling water storage tank (RWST), establishing high pressure recirculation, establishing recirculation spray, and cross-connecting RWSTs. All categories are not applicable to all initiating events and all plant operating states (POS). (author)

  8. 76 FR 36910 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Science.gov (United States)

    2011-06-23

    ... Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC... Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power [[Page... subscribed docket(s). For assistance with any FERC Online service, please e-mail [email protected

  9. 76 FR 34692 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Science.gov (United States)

    2011-06-14

    ... Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC... Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC... notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service...

  10. Power of Companies in Supply Chains and Their Effect on Network Development

    Directory of Open Access Journals (Sweden)

    Tamás Brányi

    2015-01-01

    Full Text Available A general supply chain functions as a closed cluster and consists of at least three companies: supplier, producer and buyer. In an optimal case the companies within a supply chain are well integrated, partnership rests on trust which results in common strategic decisions. Business practices show that there is a stronger company within the chain that uses its power position to influence network development. The objective of the research is to measure how and what kind of power position is needed to influence the supply chain. The hypothesis states, that power and network development are opposite effects in a supply chain. Statistical examination of data gained from 221 companies state that the company with power position has advantages if the supply chain extends. SPSS analysis proves that the hypothesis is false and opens a new direction of research. Companies within the supply chain have to cope with power structures while cooperating with each other. They tend to look for solutions to ease dependency. Using or misusing power has several factors; mainly they are inherited from the strongest link of the supply chain. This is usually a problem but the results of the statistical analysis show that still a win-win situation is needed for the companies in order to deepen the cooperation. To conclude this research the data shows that the goal is to be more competitive as a chain, not just as a company.

  11. Practical PRA applications at Consumers Power Company

    International Nuclear Information System (INIS)

    Blanchard, D.P.

    1985-01-01

    Consumers Power Company has completed two probabilistic risk assessments (PRAs), one each at its Big Rock Point and Midland plants and is in the process of performing a third study at its Palisades Plant. Each PRA is summarized briefly in this paper. Each PRA has been used to evaluate specific plant design features and make operating and design recommendations to plant and Company management as well as to the regulator. This paper is a sumary of those issues on which Consumers Power Company has applied PRAs to date. The technique used in applying PRA to these issues has varied as more was learned about the plants from the PRA and about PRA itself. Some issue resolutions involved deriving technical arguments from small parts of the PRA only, such as the logic models or consequence analysis. Still others required use of the entire PRA including sequence quantification, plant and containment response, consequence analysis and eventually cost-benefit evaluation of proposed resolutions. The benefits derived from these analyses have also varied and include not only a perceived reduction in the risks associated with plant operation but also economic benefit to the Company in that cost-effective alternatives to resolving safety issues have been permitted

  12. The power of PV: one US company shows the potential of solar energy

    International Nuclear Information System (INIS)

    Wood, L.

    2005-01-01

    A California-based company, PowerLight, has grown from a one-man shop in 1991 to a company with 100 employees, an annual turnover of $100 million and an impressive client list. The company is one of the USA's fastest growing companies and a leader in large-scale, grid-connected solar systems. Its patented PowerGuard offers a lightweight solar rooftop assembly, while its PowerTracker product is a ground-mounted PV system. Details of some of the company's large projects are given and its plans for new markets highlighted

  13. Design of investment management optimization system for power grid companies under new electricity reform

    Science.gov (United States)

    Yang, Chunhui; Su, Zhixiong; Wang, Xin; Liu, Yang; Qi, Yongwei

    2017-03-01

    The new normalization of the economic situation and the implementation of a new round of electric power system reform put forward higher requirements to the daily operation of power grid companies. As an important day-to-day operation of power grid companies, investment management is directly related to the promotion of the company's operating efficiency and management level. In this context, the establishment of power grid company investment management optimization system will help to improve the level of investment management and control the company, which is of great significance for power gird companies to adapt to market environment changing as soon as possible and meet the policy environment requirements. Therefore, the purpose of this paper is to construct the investment management optimization system of power grid companies, which includes investment management system, investment process control system, investment structure optimization system, and investment project evaluation system and investment management information platform support system.

  14. 78 FR 43197 - Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando...

    Science.gov (United States)

    2013-07-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ER13-1922-000; ER13-1929-000; ER13-1932-000; NJ13-11-000] Duke Energy Florida, Inc.; Florida Power & Light Company; Tampa Electric Company; Orlando Utilities Commission; Notice of Compliance Filings Take notice that on July 10, 2013, Duke Energy...

  15. Georgia Power Company's college degree program

    International Nuclear Information System (INIS)

    Coggin, C.L.

    1988-01-01

    The purpose of this paper is to describe Georgia Power Company's on-site college degree program for nuclear power plant personnel. In February 1986, the US Nuclear Regulatory Commission issued a policy statement concerning engineering expertise on shift (Generic Letter 86-04), which appeared in Volume 50, Number 208 of the October 28, 1985 Federal Register. One of the options available to nuclear power plant personnel to meet the requirement was the combined senior reactor operator/shift technical adviser position. One of the methods for meeting the option included a bachelor's degree in engineering technology for an accredited institution, including course work in the physical, mathematical, or engineering sciences

  16. Attitudes of the general public and electric power company employees toward nuclear power generation

    International Nuclear Information System (INIS)

    Komiyama, Hisashi

    1997-01-01

    We conducted an awareness survey targeted at members of the general public residing in urban areas and in areas scheduled for construction of nuclear power plants as well as employees of electric power company in order to determine the awareness and attitude structures of people residing near scheduled construction sites of nuclear power plants with respect to nuclear power generation, and to examine ways of making improvements in terms of promoting nuclear power plant construction sites. Analysis of those results revealed that there are no significant differences in the awareness and attitudes of people residing in urban areas and in areas near scheduled construction sites. On the contrary, a general sense of apprehension regarding the construction of nuclear power plants was observed common to both groups. In addition, significant differences in awareness and attitudes with respect to various factors were determined to exist between members of the general public residing in urban areas and scheduled construction sites and employees of electric power company. (author)

  17. Virginia Power's nuclear operations: Leading by example

    Energy Technology Data Exchange (ETDEWEB)

    Kuehn, S.E.

    1995-02-01

    Success has been a long time coming for Virginia Power's nuclear units, but after a record run and some of the shortest refueling outages ever, the rest of the industry could learn a few things. This article describes the changes made by Virginia Power at its Surry and North Anna plants. Virginia Power's recipe for success called for equal amounts of individual initiative, management savvy, engineering discipline, organization, dedication, perseverance, pride, introspection, motivation, and humility.

  18. Nitrogen oxide control at power plants of the ENEL company (Italy)

    Energy Technology Data Exchange (ETDEWEB)

    Kotler, V.R. (Vserossiiskii Teplotekhnicheskii Institut (Russian Federation))

    1993-03-01

    Analyzes experiences of the ENEL electricity company in Italy in controlling pollutant emission from fossil-fuel power plants. In 1990, the company produced 87% of the country's electricity. Until the year 2000, ENEL plans to increase coal use for power generation by 23.5% and install 9,300 MW of new coal-fired power plant capacity. New European and Italian emission standards require ENEL to reduce NO[sub x] emissions by 30% from 1986 to 1998. NO[sub x] emission values from various fuel-oil and pulverized-coal fired steam generators operated by the company are given. Modifications to existing combustion technologies and equipment installed to lower NO[sub x] content in flue gases at various ENEL power plants are considered. The most promising coal combustion technologies and ongoing research programs are pointed out. 4 refs.

  19. 75 FR 16524 - FirstEnergy Nuclear Operating Company, Perry Nuclear Power Plant; Exemption

    Science.gov (United States)

    2010-04-01

    ... Company, Perry Nuclear Power Plant; Exemption 1.0 Background FirstEnergy Nuclear Operating Company (FENOC... the Perry Nuclear Power Plant, Unit 1 (PNPP). The license provides, among other things, that the... date for all operating nuclear power plants, but noted that the Commission's regulations provide...

  20. Descriptive statistics of occupational employment in nuclear power utilities. Final working paper

    International Nuclear Information System (INIS)

    Little, J.R.; Johnson, R.C.

    1982-10-01

    The Institute of Nuclear Power Operations conducted a survey of its 58 member utilities during the Spring of 1982. This was the second such survey performed to identify employment trends and to project needs for trained personnel in the industry to 1991. The first was performed in 1981. The 1982 employment survey consisted of four questionnaires, asking for information on: (1) on-site employment; (2) on-site turnover; (3) off-site employment; and (4) off-site turnover. The survey instruments were designed to reflect approaches used by the utilities to meet the labor requirements for operation of nuclear power plants through off-site support personnel, contractors, and holding company personnel, as well as utility employees working at the plant site. On-site information was received from all 83 plants at the 58 utilities. However, employment information from Surry of VEPCO arrived too late to be included in the analysis. Therefore, their numbers are reflected in the adjusted totals. Responses to requests for off-site employment information were received from 55 of the 58 utilities

  1. Analyses of natural circulation during a Surry station blackout using SCDAP/RELAP5

    International Nuclear Information System (INIS)

    Bayless, P.D.

    1988-10-01

    The effects of reactor coolant system natural circulation on the response of the Surry nuclear power plant during a station blackout transient were investigated. A TMLB' sequence (loss of all ac power, immediate loss of auxillary feedwater) was simulated from transient initiation until after fuel rod relocation had begun. Integral analyses of the system thermal-hydraulics and the core damage behavior were performed using the SCDAP/RELAP5 computer code and several different models of the plant. Three scoping calculations were performed in which the complexity of the plant model was progressively increased to determine the overall effects of in-vessel and hot leg natural circulation flows on the plant response. The natural circulation flows extended the transient, slowing the core heatup and delaying core damage by transferring energy from the core to structures in the upper plenum and coolant loops. Increased temperatures in the ex-core structures indicated that they may fail, however. Nine sensitivity calculations were then performed to investigate the effects of modeling uncertainties on the multidimensional natural circulation flows and the system response. Creep rupture failure of the pressurizer surge line was predicted to occur in eight of the calculations, with the hot leg failing in the ninth. The failure time was fairly insensitive to the parameters varied. The failures occurred near the time that fuel rod relocation began, well before failure of the reactor vessel would be expected. A calculation was also performed in which creep rupture failure of the surge line was modeled. The subsequent blowdown led to rapid accumulator injection and quenching of the entire core. 18 refs., 105 figs., 17 tabs

  2. Role of Dividend of Power to Buy Shares in Companies in Indonesia Stock Exchange

    Directory of Open Access Journals (Sweden)

    Iskandar Muda

    2017-06-01

    Full Text Available This study aims to determine the role of the Purchasing Power Shares on manufacturing companies in Indonesia Stock Exchange Period 2014-2015. The variables used in this study as an Independent Variable Dividend and Purchasing Power Shares as Dependent Variables. Power Buy Stocks in this study was measured by the volume of stock sales every year. This research was conducted in Manufacturing company listed on the Indonesia Stock Exchange. The population of this study were 144 companies with purposive sampling as many as 19 of the Company's Manufacturing Company listed on the Indonesia Stock Exchange with the study of the 2014-2015 period in order to obtain 38 units of analysis. Data of this research are secondary data from the financial statements of 19 companies published in the Indonesia Stock Exchange. This research data processing method using the Test Statistics Deskribtif, Classical Assumption Test, Test Linear Regression using SPSS. The results of this study demonstrate that the role of the Dividend has significant influence on the Purchasing Power Shares in Manufacturing Company in Indonesia Stock Exchange (BEI.

  3. Least cost planning within the service concept of power supply companies

    International Nuclear Information System (INIS)

    Lueschen, H.; Sonntag, J.; Werner, R.

    1995-01-01

    In discussing the implementation of energy service concepts, German power supply companies are gradually adopting categories originating from the USA, namely integrated resources planning (IRP), least cost planning (LCP), and demand-side management (DSM). While the activities of German power supply companies are more encompassing than those of their US counterparts in the traditional features of DSM such as load management, information, and consulting, further-going measures such as direct investment and financial incentive programmes for exploiting energy-saving potentials play a less important role and are controversial in the energy-political debate. The article presents the concept of power supply companies for implementing IRP/LCP and makes a concrete assessment of the worth and efficiency of consulting compared with the newer type of financial incentive programmes. (orig.) [de

  4. Company of the month: French EDF opts for nuclear power

    International Nuclear Information System (INIS)

    Jansen, Siw Linnea

    2006-01-01

    EDF is Europe's largest power company with 640 TWh produced in 2005 and 36,7 million customers in Europe. On a global scale the company has more than 40 million customers. EDF has significant positions in the four big energy markets in Europe: Germany, France, Great Britain and Italy. EDF has an ambitious investment program in the area of nuclear power, and holds that increased investments in this sector is the best and most beneficial way of keeping up with Europe's increasing energy demand (ml)

  5. Power of Companies in Supply Chains and Their Effect on Network Development

    OpenAIRE

    Tamás Brányi; László Józsa

    2015-01-01

    A general supply chain functions as a closed cluster and consists of at least three companies: supplier, producer and buyer. In an optimal case the companies within a supply chain are well integrated, partnership rests on trust which results in common strategic decisions. Business practices show that there is a stronger company within the chain that uses its power position to influence network development. The objective of the research is to measure how and what kind of power position is need...

  6. DETERMINANTS AFFECTING THE SUCCESS OF DISTRIBUTION GRID PROJECTS IN BINH THUAN POWER COMPANY, VIETNAM

    OpenAIRE

    Pham Van Tai* & Le Duc Thu

    2017-01-01

    The research identified the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company, clarify the mutual relationship between the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company and recommended and rated the solution to enhance the success of the distribution grid project in Binh Thuan Power Company. The research had found fours critical factors: External factors of project, Controlling and coordina...

  7. Summary of MELCOR 1.8.2 calculations for three LOCA sequences (AG, S2D, and S3D) at the Surry Plant

    International Nuclear Information System (INIS)

    Kmetyk, L.; Smith, L.

    1994-03-01

    Activities involving regulatory implementation of updated source term information were pursued. These activities include the identification of the source term, the identification of the chemical form of iodine in the source term, and the timing of the source term's entrance into containment. These activities are intended to support a more realistic source term for licensing nuclear power plants than the current TID-14844 source term and current licensing assumptions. MELCOR calculations were performed to support the technical basis for the updated source term. This report presents the results from three MELCOR calculations of nuclear power plant accident sequences and presents comparisons with Source Term code Package (STCP) calculations for the same sequences. The three low-pressure sequences were analyzed to identify the materials which enter containment (source terms) and are available for release to the environment, and to obtain timing of sequence events. The source terms include fission products and other materials such as those generated by core-concrete interactions. All three calculations, for both MELCOR and STCP, analyzed the Surry plant, a pressurized water reactor (PWR) with a subatmospheric containment design

  8. Carolina Power and Light Company's computerized Radiological Information Management System

    International Nuclear Information System (INIS)

    Meyer, B.A.

    1987-01-01

    Carolina Power and Lignt Company has recently implement a new version of their computerized Radiological Information management System. The new version was programmed in-house and is run on the Company's mainframe computers. In addition to providing radiation worker dose histories and current dose updates, the system provides real-time access control for all three of the Company's nuclear plants such as respirator and survey equipment control and inventory, TLD QC records, and many other functions

  9. 75 FR 80547 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption

    Science.gov (United States)

    2010-12-22

    ..., Shearon Harris Nuclear Power Plant, Unit No. 1; Exemption 1.0 Background Carolina Power & Light Company... operation of the Shearon Harris Nuclear Power Plant (HNP), Unit 1. The license provides, among other things... request to generically extend the rule's compliance date for all operating nuclear power plants, but noted...

  10. 76 FR 54259 - Virginia Electric and Power Company, Docket Nos. 50-338 and 50-339, North Anna Power Station...

    Science.gov (United States)

    2011-08-31

    ... NUCLEAR REGULATORY COMMISSION [NRC-2011-0185] Virginia Electric and Power Company, Docket Nos. 50.... NPF-4 and NPF-7, issued to Virginia Electric Power Company (the licensee), for operation of the North...) and (d) during declarations of severe weather conditions involving tropical storm or hurricane force...

  11. Experience of electric power conservation in COELBA (Bahia Electric Company)

    International Nuclear Information System (INIS)

    Bastos, A.C.F.

    1990-01-01

    The electric power crisis of Brazilian north-east in 1987 imposes the Bahia Electric Company-COELBA to management a electric power conservation. The institutional, organizational and operational aspects are presented, including the tariff system, the market, the consumption and the relation with public. (author)

  12. Establishment of professional nuclear power architectural engineering company

    International Nuclear Information System (INIS)

    Guo Dongli; Chen Hua

    2006-01-01

    The rapid development of nuclear power industry in China requires specialized management for the nuclear power engineering projects. It is necessary to establish the nuclear power architectural engineering company to meet the increasing market needs by providing the owner with specialized nuclear engineering project management and overall contracting services. It is imperative that the purpose of establishing the corporation and enterprise core competitiveness should be clearly identified when it is established. Its organizational structure should be geared to the enterprise operation management and development to facilitate the intensified project management and control, and improve its risk-proof ability. (authors)

  13. 75 FR 52523 - Bowersock Mills and Power Company; Notice of Availability of Environmental Assessment

    Science.gov (United States)

    2010-08-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13526-002-KS] Bowersock Mills and Power Company; Notice of Availability of Environmental Assessment August 19, 2010. In... reviewed the application for an original license for the Bowersock Mills and Power Company's Expanded...

  14. 76 FR 36914 - Astoria Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas...

    Science.gov (United States)

    2011-06-23

    ... Generating Company, L.P., NRG Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC... Power Marketing LLC, Arthur Kill Power LLC, Astoria Gas Turbine Power LLC, Dunkirk Power LLC, Huntley... when a document is added to a subscribed docket(s). For assistance with any FERC Online service, please...

  15. 75 FR 11149 - Bowersock Mills and Power Company; Notice of Application Tendered for Filing With the Commission...

    Science.gov (United States)

    2010-03-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13526-001] Bowersock Mills...: Bowersock Mills Power Company (Bowersock). e. Name of Project: Bowersock Mills and Power Company Expanded....S.C. 791(a)-825(r). h. Applicant Contact: Sarah Hill-Nelson, The Bowersock Mills and Power Company...

  16. The adaptation of the electric power companies to the power market

    International Nuclear Information System (INIS)

    Otterstad, B.; Ottosen, R.

    1993-02-01

    This report describes the challenges met by the Norwegian electric power companies in adapting to a more market oriented business and their possibilities and strategies when facing the uncertainties on the market side. The main principles of adaptation to the market are described and various strategies are illustrated by means of simple calculations and figures. The theoretical basis for analyses of adaptation to the market and for pricing period contracts and options are discussed. The report concludes with a discussion of the de-regulation of the North American gas market and draws parallels to the Norwegian power market. 17 figs

  17. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Jo, J.; Lin, C.C.; Neymotin, L. [Brookhaven National Lab., Upton, NY (United States)] [and others

    1995-05-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6.

  18. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Evaluation of severe accident risk during mid-loop operations. Main report. Volume 6. Part 1

    International Nuclear Information System (INIS)

    Jo, J.; Lin, C.C.; Neymotin, L.

    1995-05-01

    During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by Brookhaven National Laboratory (BNL) and Sandia National Laboratories (SNL). Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. A phased approach was used in the level-1 program. In phase 1 which was completed in Fall 1991, a coarse screening analysis including internal fire and flood was performed for all plant operational states (POSs). The objective of the phase 1 study was to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenarios, and to provide a foundation for a detailed phase 2 analysis. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The results of the phase 2 level 2/3 study are the subject of this volume of NUREG/CR-6144, Volume 6

  19. 'Nuclearelectrica' Company messages for a broadly acceptable nuclear power program

    International Nuclear Information System (INIS)

    Stiopol, Mihaela; Bilegan, C. Iosif

    2001-01-01

    Romania started the nuclear power program about 20 years ago, by a high level Government decision. After 1989 the former Ministry of Electrical Power was transformed into a state owned company, RENEL, in which nuclear activities were also included. RENEL was a monopoly system responsible for production, transport and distribution of electricity in Romania. The deregulation process in the power sector was many times asked by the World Bank and International Monetary Fund, to split this monopoly system in separately activities: Production, Transport and Distribution. The first step occurred in July 1998, when the nuclear activities were externalized from RENEL. In nuclear sector two new entities were created: SN 'Nuclearelectrica' SA, a state own company that includes three branches: - Nuclear Power Production - Cernavoda NPP Unit 1; - Nuclear Fuel Plant-Pitesti; - Project Development Branch - Cernavoda Units 2-5. The second entity is the so-called Romanian Authority (Autonomous Reggie) for Nuclear Activities (RAAN), including as branches the heavy water fabrication plant 'ROMAG PROD', the Nuclear Research Institute (ICN) Pitesti and the Nuclear Engineering and Design Institute (CITON) Bucharest. The rest of conventional power sector was renamed, namely, CONEL. The organization process continued and in August 2000, by a Government Ordinance the CONEL was split into the following companies: - one for hydropower production 'HIDROELECTRICA'; - one for thermal power production 'TERMOELECTRICA'; - one for transport 'TRANSELECTRICA'; - one for distribution 'ELECTRICA'. The goal of a third step of restructuring process is the privatization in the power field. The steps of Romanian Power Sector Restructuring are presented. Since 1991 a Public Information program has been established. Depending on the evolution of the construction of the first Romanian nuclear power station, during the years, the messages changed. Everybody working in the nuclear field knows how difficult is

  20. 77 FR 77073 - York Haven Power Company, LLC; Notice of Meeting

    Science.gov (United States)

    2012-12-31

    ... Company, LLC; Notice of Meeting On Wednesday, January 9, 2013, Commission staff will meet with York Haven Power Company, LLC (applicant) in Washington, DC. The purpose of the meeting is to discuss the required... begin at 10 a.m. at the Federal Energy Regulatory Commission headquarters building located at 888 First...

  1. Development of management systems for nuclear power plant of Hokuriku Electric Power Company

    International Nuclear Information System (INIS)

    Nakamura, Tatsuaki; Hasunuma, Junichi; Suzuki, Shintaro

    2009-01-01

    Hokuriku Electric Power Company has been operating the Shika Nuclear Power Station that it constructed in Shika city, Ishikawa prefecture, for over 15 years since bringing Unit 1 of this plant online in July 1993. In addition to electricity generation, maintenance and inspection tasks constitute a big part of operating a large-scale nuclear power plant, and in recent years, problems at power stations in the nuclear power industry have led to several revisions of nationally regulated maintenance and inspection systems. This paper describes the background, objectives, development method, and features of the Maintenance Management System and Maintenance History Management System that make effective use of information technology to promote safer and more efficient maintenance work at large-scale nuclear power plants. (author)

  2. 77 FR 108 - Lockhart Power Company, Inc.; Notice Soliciting Scoping Comments

    Science.gov (United States)

    2012-01-03

    ... affect any federal lands. g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791 (a)-825(r). h. Applicant Contacts: Bryan D. Stone, Chief Operating Officer, Lockhart Power Company, Inc., 420 River Street, P.O. Box...

  3. 76 FR 66090 - Facility Operating License Amendment From Virginia Electric and Power Company, Surry Power...

    Science.gov (United States)

    2011-10-25

    ... process, thermal expansion mismatch between the tube and tubesheet, and from the differential pressure... staff at 1- 800-397-4209, 301-415-4737, or by e-mail to [email protected] . The application for... attachment to the application, dated July 28, 2011, contains SUNSI and, accordingly, this portion is being...

  4. Own power: Motives of having electricity without the energy company

    International Nuclear Information System (INIS)

    Leenheer, Jorna; Nooij, Michiel de; Sheikh, Omer

    2011-01-01

    New technologies will enable households to generate an increasing amount of their own electricity. Intentions to generate own power are a preliminary step towards actual behavior. Because own generation is still very limited and the behavior of early adopters may not be representative for the complete population, our study focuses on intentions rather than actual behavior. A consumer survey among 2047 Dutch households reveals that environmental concerns are the most important driver of a household's intention to generate its own power. Affinity with technology and energy and the reputation of electricity companies are also significant drivers, but financial factors and power outages are not. About 40% of Dutch households have an intention to generate their own power, with an overrepresentation of young households. This group falls apart in two sub segments; for the 'generating savers' (21%) a high intention to generate own power coincides with a high intention to save energy, whereas generating users (18%) combine a high intention to generate own power with a low intention to save energy. - Highlights: → A consumer survey studies household intentions to generate own power. → Environmental concerns are the most important motive for generating own power. → Other drivers are affinity with technology and reputation of electricity companies. → About 40% of Dutch households feel a need to generate their own electricity.

  5. Efficiency of Finish power transmission network companies

    International Nuclear Information System (INIS)

    Anon.

    2001-01-01

    The Finnish Energy Market Authority has investigated the efficiency of power transmissions network companies. The results show that the intensification potential of the branch is 402 million FIM, corresponding to about 15% of the total costs of the branch and 7.3 % of the turnout. Energy Market Authority supervises the reasonableness of the power transmission prices, and it will use the results of the research in supervision. The research was carried out by the Quantitative Methods Research Group of Helsinki School of Economics. The main objective of the research was to create an efficiency estimation method for electric power distribution network business used for Finnish conditions. Data of the year 1998 was used as basic material in the research. Twenty-one of the 102 power distribution network operators was estimated to be totally efficient. Highest possible efficiency rate was 100, and the average of the efficiency rates of all the operators was 76.9, the minimum being 42.6

  6. 15 years of information and educational programme of Czech Power Company CEZ

    International Nuclear Information System (INIS)

    Dufkova, M.

    2007-01-01

    The education program is the most important long-term communication programme of CEZ. It was established in 1992 shortly after an establishment of Czech Power Company. The support of education and talented students is doubtless a positive activity bringing a benefit to the company, especially in the field of nuclear energy. Students, who have been currently addressed with this program, are future consumers of electricity and as voters and politicians they shall decide on further development of power industry and nuclear installations. We care for them to make qualified decisions. CEZ has so far been the only Czech industrial company, which offers such program to schools. Education is the most important activity in the gaining support for nuclear energy. (author)

  7. Virginia Power's regulatory reduction program

    International Nuclear Information System (INIS)

    Miller, G.D.

    1996-01-01

    Virginia Power has two nuclear plants, North Anna and Surry Power Stations, which have two units each for a total of four nuclear units. In 1992, the Nuclear Regulatory Commission solicited comments from the nuclear industry to obtain their ideas for reducing the regulatory burden on nuclear facilities. Pursuant to the new regulatory climate, Virginia Power developed an internal program to evaluate and assess the regulatory and self-imposed requirements to which they were committed, and to pursue regulatory relief or internal changes where possible and appropriate. The criteria were that public safety must be maintained, and savings must be significant. Up to the date of the conference, over US$22 million of one-time saving had been effected, and US$2.75 million in annual savings

  8. Biomass utilization at Northern States Power Company

    International Nuclear Information System (INIS)

    Ellis, R.P.

    1994-01-01

    Northern States Power Company (open-quotes NSPclose quotes) generates, transmits and distributes electricity and distributes natural gas to customers in Minnesota, Wisconsin, North Dakota, South Dakota and Michigan. An important and growing component of the fuel needed to generate steam for electrical production is biomass. This paper describes NSP's historical use of biomass, current biomass resources and an overview of how NSP plans to expand its use of biomass in the future

  9. Prospects of Foreign Capital Raising for Russian Power Grid Companies

    Directory of Open Access Journals (Sweden)

    N. N. Shvets

    2015-01-01

    Full Text Available The power sector reform in Russia saw capital raising as one of the key objectives. Additional investments are necessary, in particular, for renovation of fixed assets which are ca. 70% worn out. The official Strategy for the development of the Russian power grid also provides for privatization of certain companies and foreign investors are considered among others as the target audience. Upon prospective privatization the sector is expected not only to experience a certain increase in capital expenditures, but also to benefit from foreign expertise and efficiency enhancement. At the moment, however, the privatization plans are hard to implement due to a number of obstacles. Prospective investors are mostly concerned about the lack of transparent regulation and clear development strategy of the industry. This is particularly relevant to the tariff system, which has been continuously altered in recent years. This might be explained by the need of the state support by other sectors, which is often provided at the expense of the power industry. Furthermore, the prospects of foreign capital raising are negatively influenced by the conflict in Ukraine and the corresponding negative perception of potential investors. The above factors result in the decrease in value of power grid companies as well as in the lack of visibility regarding the prospects of the sector development. Privatization thus becomes unreasonable both for the state and prospective investors. At the same time, despite the sector specifics, there are precedents of successful sale of power grid assets to private investors by international peers. Particularly, Vatenfall and Forum have recently closed relevant transactions, nothing to say about the power grid sector of Brazil, majorly controlled by private owners. Transparent regulation, clear pricing rules and well-balanced economic policy are, indeed, indispensable prerequisites for successful privatization. Those might back up a

  10. The correlation between management power and risk in the Italian companies

    Directory of Open Access Journals (Sweden)

    Raffaella Scarabino

    2013-03-01

    Full Text Available The shareholders can not directly manage the business but they have powers of pulse and control by voting right that is essential for the correct functioning of the company. In 1942 the Italian legislature, although with some exceptions, adopted One share – One vote rule. The legal framework changed significantly after the enactment of corporate law reform in 2003. The objective of this research is to examine the status of the principle of correlation between management power and risk in the context of the regulatory framework of Italian public companies, as it emerged after the enactment of above mentioned corporate law reform in 2003.

  11. 75 FR 54400 - Florida Power and Light Company; Establishment of Atomic Safety and Licensing Board

    Science.gov (United States)

    2010-09-07

    ...] Florida Power and Light Company; Establishment of Atomic Safety and Licensing Board Pursuant to delegation..., notice is hereby given that an Atomic Safety and Licensing Board (Board) is being established to preside over the following proceeding: Florida Power & Light Company (Turkey Point Units 6 and 7) This...

  12. Teollisuuden Voima Oy - Industrial Power Company Ltd. Local information activity

    Energy Technology Data Exchange (ETDEWEB)

    Engros, Taina [Department of Information, TVO, Olkiluoto FIN-27160 (Finland)

    1989-07-01

    There are two nuclear power producers in Finland - the state-owned power company Imatran Voima Oy which operates two 440 MW Soviet-made PWR units in southern Finland, east of Helsinki and the Teollisuuden Voima Oy - Industrial Power Company Ltd, or TVO, owned by Finnish industrial companies. TVO operates two 710 MW ABB ATOM BWR units producing about one fifth of the country's electricity consumption. Operating experiences are extremely good from all Finnish nuclear power plants. The Finns' attitude towards nuclear power has changed into a positive direction in recent times. This can probably be noted as an international trend now that the Chernobyl accident is becoming an incident of the past. The Finnish citizens and politicians are facing two questions; first, what is their attitude towards nuclear power as a source of energy, in other words, do they approve of the plants currently in operation. The second question is how they stand on the building of new plants. It is probably another universal phenomenon that the attitudes of people living in the vicinity of nuclear power plants are less critical than the attitudes of those living farther away. This does not, by any means, result in local information activity being easier or less important than nationwide information activity. On the contrary, local decision-makers, local media and inhabitants are those who can, and through whom we can, influence also wider circles. The Nuclear Energy Act, which became effective in Finland last year, defines that the final decision on whether nuclear power plants can be built inside a municipality, is made at local level. As far as TVO is concerned one factor making local information activity easier is the small size of the locality. The difficulty TVO has to face is the people's suspicion of information activity. All information is considered propaganda, regardless of its form, and only negative news are considered information. Also, a large proportion of people are passive

  13. Teollisuuden Voima Oy - Industrial Power Company Ltd. Local information activity

    International Nuclear Information System (INIS)

    Engros, Taina

    1989-01-01

    There are two nuclear power producers in Finland - the state-owned power company Imatran Voima Oy which operates two 440 MW Soviet-made PWR units in southern Finland, east of Helsinki and the Teollisuuden Voima Oy - Industrial Power Company Ltd, or TVO, owned by Finnish industrial companies. TVO operates two 710 MW ABB ATOM BWR units producing about one fifth of the country's electricity consumption. Operating experiences are extremely good from all Finnish nuclear power plants. The Finns' attitude towards nuclear power has changed into a positive direction in recent times. This can probably be noted as an international trend now that the Chernobyl accident is becoming an incident of the past. The Finnish citizens and politicians are facing two questions; first, what is their attitude towards nuclear power as a source of energy, in other words, do they approve of the plants currently in operation. The second question is how they stand on the building of new plants. It is probably another universal phenomenon that the attitudes of people living in the vicinity of nuclear power plants are less critical than the attitudes of those living farther away. This does not, by any means, result in local information activity being easier or less important than nationwide information activity. On the contrary, local decision-makers, local media and inhabitants are those who can, and through whom we can, influence also wider circles. The Nuclear Energy Act, which became effective in Finland last year, defines that the final decision on whether nuclear power plants can be built inside a municipality, is made at local level. As far as TVO is concerned one factor making local information activity easier is the small size of the locality. The difficulty TVO has to face is the people's suspicion of information activity. All information is considered propaganda, regardless of its form, and only negative news are considered information. Also, a large proportion of people are passive

  14. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit-1: Analysis of core damage frequency from internal events during mid-loop operations. Appendices F-H, Volume 2, Part 4

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Bley, D.; Johnson, D.; Holmes, B.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis

  15. Annual report 2007 - CPFL Energy - Light and Power Company from Sao Paulo, SP, Brazil

    International Nuclear Information System (INIS)

    2008-01-01

    This document presents the balance of the economic, social, environmental performance of the Sao Paulo Light and Power Company (CPFL), during the year of 2007 as follows: highlights of 2007; profile of the CPFL Energy group; corporative performance; strategy of the company; performance in 2007 (the best year of the company); social responsibility

  16. Evaluation of efficiency in Japan electric power companies

    International Nuclear Information System (INIS)

    Ghaderi, F.; Muyajima, M.

    2001-01-01

    Achieving energy efficiency also must consider supply efficiency, how much energy it takes to generate electricity and transmit it to the end user. system efficiency reflects the loss of energy during the processes of generation, transmission and distribution of electricity. Of the millions of tons of coal that are burned to produce heat in generation of electricity every year, only one third is converted into electricity.The electric power plant immediately uses 5 to 10 percent of that energy for use in the plant. Around another 10 percent of this energy is consumed in the transmission and distribution of electric energy to end users. Overall,more that 70 percent of the energy used to produce and deliver electricity never gets to the end user. The costs of this wasted energy are reflected in the customer's electricity bill. Furthermore, once delivered, users of electricity are subjected to more h idden c osts the demand charge which reflects the rate at which consumers draw energy from the power plant during a particular time of day, are also affected by the time of year. This additional charge c n be dramatic. For example, the cost for using electric air conditioning at the w rong t ime of the day , are also affected by the time of year. This additional charge can be dramatic. For example, the cost for using electric air conditioning at the wrong time of the day could be as much as 25 to 40 percent higher than what a facility normally pays for electricity during off-peak times. Minimizing the costs of operations, therefor, is a must for all electric companies. In the other hand utility rates, such as the cost of electricity, are a necessary element of operating in all enterprises.In some industries the payment over electricity make a large percentage of their total expenses, but that doesn't mean that every effort should not be made to reduce their impact on the bottom line, it should be considered that a very small change in operating procedure can change

  17. 78 FR 28835 - Salton Sea Power Generation Company; Supplemental Notice That Initial Market-Based Rate Filing...

    Science.gov (United States)

    2013-05-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-1271-000] Salton Sea Power Generation Company; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Salton Sea Power Generation Company's application for market-based rate authority, with an accompanying...

  18. 75 FR 21286 - Bowersock Mills and Power Company; Notice of Application Accepted for Filing, Soliciting Motions...

    Science.gov (United States)

    2010-04-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13526-002] Bowersock Mills... License. b. Project No.: 13526-002. c. Date Filed: February 8, 2010. d. Applicant: Bowersock Mills Power Company (Bowersock). e. Name of Project: Bowersock Mills and Power Company Expanded Kansas River...

  19. Applications of MAAP at Duke Power Company

    International Nuclear Information System (INIS)

    Barrett, M.

    1991-01-01

    The Modular Accident Analysis Program (MAAP) is a fast running, easy to use code for modeling accidents at nuclear power plants. These attributes make MAAP ideal for a number of applications. At Duke Power Company, MAAP has been used extensively in the performance of probabilistic risk assessment (PRA). Applications have also been found in the areas of emergency preparedness, training, and severe accident management. Specific applications of MAAP are presented in this paper with special attention to examples in the area of PRA success criteria development and severe accident management strategies selection. The application of MAAP to developing success criteria for ECCS performance during a large LOCA is presented. Additionally, an example of how MAAP has been used in the assessment of an alternative feed and bleed strategy is provided

  20. MELCOR 1.8.2 assessment: Surry PWR TMLB' (with a DCH study)

    International Nuclear Information System (INIS)

    Kmetyk, L.N.; Cole, R.K. Jr.; Smith, R.C.; Summers, R.M.; Thompson, S.L.

    1994-02-01

    MELCOR is a fully integrated, engineering-level computer code, being developed at Sandia National Laboratories for the USNRC. This code models the entire spectrum of severe accident phenomena in a unified framework for both BWRs and PWRs. As part of an ongoing assessment program, the MELCOR computer code has been used to analyze a station blackout transient in Surry, a three-loop Westinghouse PWR. Basecase results obtained with MELCOR 1.8.2 are presented, and compared to earlier results for the same transient calculated using MELCOR 1.8.1. The effects of new models added in MELCOR 1.8.2 (in particular, hydrodynamic interfacial momentum exchange, core debris radial relocation and core material eutectics, CORSOR-Booth fission product release, high-pressure melt ejection and direct containment heating) are investigated individually in sensitivity studies. The progress in reducing numeric effects in MELCOR 1.8.2, compared to MELCOR 1.8.1, is evaluated in both machine-dependency and time-step studies; some remaining sources of numeric dependencies (valve cycling, material relocation and hydrogen burn) are identified

  1. 75 FR 22772 - Cargill Power Markets, LLC, Complainant v. Public Service Company of New Mexico, Respondent...

    Science.gov (United States)

    2010-04-30

    ... Markets, LLC, Complainant v. Public Service Company of New Mexico, Respondent; Notice of Complaint April... of the Federal Power Act (FPA), 16 U.S.C. 824e (2006), Cargill Power Markets, LLC (Complainant) filed a formal complaint against Public Service Company of New Mexico (Respondent) alleging that...

  2. The development strategies of the european electric power companies

    International Nuclear Information System (INIS)

    Heddebaud, D.

    2005-01-01

    This study takes stock on the european market of the electric power and of its development perspectives. It details the strategy and the place of the main operators and shows their forces and weaknesses. It provides a comparison of the financial performances of 28 companies (growth, margins, profitability, debt and war chest). (A.L.B.)

  3. 76 FR 58844 - Virginia Electric and Power Company, Surry Power Station, Units 1 and 2; Exemption

    Science.gov (United States)

    2011-09-22

    ... effectively addressed through staff augmentation that can only be practically achieved through the use of work... quality of the human environment published in the Federal Register on August 31, 2011 (76 FR 54259). This...

  4. Appreciation analysis for power supply companies; Wertsteigerungsanalyse fuer Energieversorgungsunternehmen

    Energy Technology Data Exchange (ETDEWEB)

    Muche, T. [Hochschule Zittau/Goerlitz (Germany)

    2007-08-15

    In view of the probable future consolidation in the energy economy with municipal undertakings increasingly becoming subject to takeovers and participations issues of shareholder value are a matter of growing interest for power supply companies. Amongst other advantages, having a high shareholder value guards against unwanted takeovers. However, it is not enough for companies merely to know their shareholder value; they must rather have their entire operative and strategic planning and control instruments geared to it. This forms the background to a pilot project at Goerlitz/Zittau University which was dedicated to an analysis of the shareholder value of municipal undertakings on the basis of year-end financial and capital market data.

  5. Application of wind power systems to the Service Area of the Minnesota Power and Light Company. Final report, July 1975--August 1976

    Energy Technology Data Exchange (ETDEWEB)

    Lindquist, O.H.; Malver, F.S.

    1976-01-01

    Honeywell, in a joint effort with Minnesota Power and Light Company (MP and L), Boeing Vertol Company, and Dr. C.G. Justus, Georgia Institute of Technology, has conducted a regional application study of wind energy systems. Minnesota Power and Light Company, an investor-owned company with 853-MW owned capacity, has served as the case study subject utility. An initial system definition was developed based on available wind information and near-term wind turbine generator (WTG) technology. The system was tailored to fit MP and L's forecasted generation needs and the company's existing transmission and distribution system. Honeywell developed a WECS simulation to convert wind data to wind energy available for input to the utility's grid. The simulation was used to evaluate the performance of preliminary design wind turbine generators developed for ERDA/NASA by the General Electric Company and Kaman Aerospace Corporation, and to evaluate the performance of a wind turbine optimized for the Northern Minnesota wind regime and developed by the Boeing Vertol Company under subcontract to Honeywell.

  6. Role of check operators in achieving operational excellence at Virginia Power's nuclear stations

    International Nuclear Information System (INIS)

    Shriver, B.L.; Williams, T.M.; Stewart, W.L.

    1987-01-01

    Virginia Power has implemented a Check Operator Program as a part of its commitment to excellence in the operation of the North Anna and Surry nuclear power stations. The Check Operator Program utilizes highly qualified licensed personnel to independently evaluate the performance of licensed operators and senior operators during normal, abnormal and simulated emergency conditions. Emphasis is placed upon individual and team performance as well as the procedures and training which support the operators. The check operators report to line management to ensure that their recommendations are implemented into the overall operations philosophy of the power station

  7. Company Secretaries: Their duties and powers

    OpenAIRE

    2009-01-01

    Every company must have a company secretary. Their main role is to: carry out the directors’ instructions; help ensure that the company obeys the law and its own constitutional rules; and prepare and maintain the associated company documents.

  8. 76 FR 13173 - Jersey Central Power & Light Company and PSEG Fossil, LLC; Notice of Application Tendered for...

    Science.gov (United States)

    2011-03-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2309-019] Jersey Central Power & Light Company and PSEG Fossil, LLC; Notice of Application Tendered for Filing With the.... Date Filed: February 18, 2011. d. Applicant: Jersey Central Power & Light Company and PSEG Fossil, LLC...

  9. 76 FR 66333 - Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental...

    Science.gov (United States)

    2011-10-26

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2011-0247] Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2; Environmental Assessment and Finding of No Significant... Facility Operating License No. DPR-23, issued to Carolina Power & Light Company (the licensee), for...

  10. Duke Power Company's control rod wear program

    International Nuclear Information System (INIS)

    Culp, D.C.; Kitlan, M.S. Jr.

    1990-01-01

    Recent examinations performed at several foreign and domestic pressurized water reactors have identified significant control rod cladding wear, leading to the conclusion that previously believed control rod lifetimes are not attainable. To monitor control rod performance and reduce safety concerns associated with wear, Duke Power Company has developed a comprehensive control rod wear program for Ag-In-Cd and boron carbide (B 4 C) rods at the McGuire and Catawba nuclear stations. Duke Power currently uses the Westinghouse 17 x 17 Ag-In-Cd control rod design at McGuire Unit 1 and the Westinghouse 17 x 17 hybrid B 4 C control rod design with a Ag-In-Cd tip at McGuire Unit 2 and Catawba Units 1 and 2. The designs are similar, with the exception of the absorber material and clad thickness. There are 53 control rods per unit

  11. 78 FR 16490 - Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Authorization for Continued...

    Science.gov (United States)

    2013-03-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2309-000] Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Authorization for Continued Project Operation On February 18, 2011, the Jersey Central Power and Light Company and PSEG Fossil LLC, licensees for the Yards...

  12. Evaluating perceived quality of CELPE service: A Brazilian power company case study

    International Nuclear Information System (INIS)

    Paes de Barros Filho, Joao; Fritsch Damasio da Silva, Cleriston; Nascimento Melo, Maria Auxiliadora do; Dumke de Medeiros, Denise

    2009-01-01

    This paper presents an application of a methodology for the diagnosis and analysis of the service quality perceived by a Particular Group of CELPE Corporate Customers, a Brazilian power company at Pernambuco State. Concepts, on the power sector, of Quality in Services, Performance Objectives and Critical Factors of Success have been used to develop the analysis. Next, the Critical Factors for a power company were determined and classified in accordance with the performance objectives: Quality, Dependability, Speed and Flexibility. From the factors established, a questionnaire was created to collect data. The case studied involves quantitative research on CELPE's private corporate principal customers using statistical tests to measure internal consistency reliability of the questionnaire scales and to identify underlying concepts, in the four groups analyzed, through which the private corporate customers perceive quality in the given services. Among the goals of this study are to improve the relationship with principal Private Corporate Clients, to create customer loyalty, and to maximize efforts in providing the power supply service, all of them with a view to improving and determining the Global Satisfaction Index

  13. Evaluating perceived quality of CELPE service: A Brazilian power company case study

    Energy Technology Data Exchange (ETDEWEB)

    Paes de Barros Filho, Joao [Federal University of Pernambuco (UFPE), Center of Technology and Geosciences, 5th floor, Academico Helio Ramos av., Cidade Universitaria, Recife, PE 50.670-901 (Brazil)], E-mail: joaopaes@celpe.com.br; Fritsch Damasio da Silva, Cleriston [Federal University of Pernambuco (UFPE), Center of Technology and Geosciences, 5th floor, Academico Helio Ramos av., Cidade Universitaria, Recife, PE 50.670-901 (Brazil)], E-mail: cleriston_silva@yahoo.com.br; Nascimento Melo, Maria Auxiliadora do [Federal University of Pernambuco (UFPE), Center of Technology and Geosciences, 5th floor, Academico Helio Ramos av., Cidade Universitaria, Recife, PE 50.670-901 (Brazil)], E-mail: manmelo@ufpe.br; Dumke de Medeiros, Denise [Federal University of Pernambuco (UFPE), Center of Technology and Geosciences, 5th floor, Academico Helio Ramos av., Cidade Universitaria, Recife, PE 50.670-901 (Brazil)], E-mail: ddm@ufpe.br

    2009-04-15

    This paper presents an application of a methodology for the diagnosis and analysis of the service quality perceived by a Particular Group of CELPE Corporate Customers, a Brazilian power company at Pernambuco State. Concepts, on the power sector, of Quality in Services, Performance Objectives and Critical Factors of Success have been used to develop the analysis. Next, the Critical Factors for a power company were determined and classified in accordance with the performance objectives: Quality, Dependability, Speed and Flexibility. From the factors established, a questionnaire was created to collect data. The case studied involves quantitative research on CELPE's private corporate principal customers using statistical tests to measure internal consistency reliability of the questionnaire scales and to identify underlying concepts, in the four groups analyzed, through which the private corporate customers perceive quality in the given services. Among the goals of this study are to improve the relationship with principal Private Corporate Clients, to create customer loyalty, and to maximize efforts in providing the power supply service, all of them with a view to improving and determining the Global Satisfaction Index.

  14. Evaluating perceived quality of CELPE service. A Brazilian power company case study

    Energy Technology Data Exchange (ETDEWEB)

    De Barros Filho, Joao Paes; Da Silva, Cleriston Fritsch Damasio; Do Nascimento Melo, Maria Auxiliadora; De Medeiros, Denise Dumke [Federal University of Pernambuco (UFPE), Center of Technology and Geosciences, 5th floor, Academico Helio Ramos av., Cidade Universitaria, Recife, PE 50.670-901 (Brazil)

    2009-04-15

    This paper presents an application of a methodology for the diagnosis and analysis of the service quality perceived by a Particular Group of CELPE Corporate Customers, a Brazilian power company at Pernambuco State. Concepts, on the power sector, of Quality in Services, Performance Objectives and Critical Factors of Success have been used to develop the analysis. Next, the Critical Factors for a power company were determined and classified in accordance with the performance objectives: Quality, Dependability, Speed and Flexibility. From the factors established, a questionnaire was created to collect data. The case studied involves quantitative research on CELPE's private corporate principal customers using statistical tests to measure internal consistency reliability of the questionnaire scales and to identify underlying concepts, in the four groups analyzed, through which the private corporate customers perceive quality in the given services. Among the goals of this study are to improve the relationship with principal Private Corporate Clients, to create customer loyalty, and to maximize efforts in providing the power supply service, all of them with a view to improving and determining the Global Satisfaction Index. (author)

  15. 76 FR 51065 - Florida Power & Light Company; Establishment of Atomic Safety and Licensing Board

    Science.gov (United States)

    2011-08-17

    ... & Light Company; Establishment of Atomic Safety and Licensing Board Pursuant to delegation by the... hereby given that an Atomic Safety and Licensing Board (Board) is being established to preside over the following proceeding: Florida Power & Light Company (St. Lucie Plant, Unit 1) This proceeding involves a...

  16. Status of US storage efforts

    International Nuclear Information System (INIS)

    Leasburg, R.H.

    1984-01-01

    Tasks involved in the implementation of the Nuclear Waste Policy Act are discussed. The need for speedy action on applications to deal with spent fuel storage problems is stressed. The problems faced by the Virginia Electric and Power Company, where full core discharge capability at the 1600-megawatt Surry power station is expected to be reached in early 1986, are reviewed. It is pointed out that although the Nuclear Waste Policy Act does not apply in this case, the problems illustrate the situation that may be faced after the Act is implemented. Problems involved in intro-utility transhipments and dry cask storage of spent fuel from Surry, including transportation ordinances at state and local levels and approval for the use of dry casks for storage, are reported. The suggestion that dry casks be used for interim storage and eventual transport to monitored retrievable storage facilities or permanent storage sites is considered. It is pointed out that data from a proposed 3-utility demonstration program of dry cask storage of consolidated fuels and the storage of fuels in air should give information applicable to the timely implementation of the Nuclear Waste Policy Act

  17. Conformance to Regulatory Guide 1.97 Slurry Power Station, Unit Nos. 1 and 2 (Docket Nos. 50-280 and 50-281)

    International Nuclear Information System (INIS)

    Stoffel, J.W.

    1985-09-01

    This EG and G Idaho, Inc., report reviews the submittals for Regulatory Guide 1.97, Revision 3, for Unit Nos. 1 and 2 of the Surry Power Station and identifies areas of nonconformance to the regulatory guide. Exceptions to Regulatory Guide 1.97 are evaluated and those areas where sufficient basis for acceptability is not provided are identified

  18. Environmental Disclosure of Electric Power Companies Listed in the Corporate Sustainability Index (CSI

    Directory of Open Access Journals (Sweden)

    Clésia Ana Gubiani

    2012-12-01

    Full Text Available The study aimed to verify the level of disclosure of environmental information in the administration reports of the energy companies listed in the Corporate Sustainability Index (CSI. A descriptive and quantitative research was done, using the content analysis technique on the administration reports from 2006 to 2008. The sample consisted of 11 electric power companies listed in the CSI. For quantitative analysis of the disclosure index, the data collection instrument was based on the study of Rover, Murcia and Borba (2008, which proposes eight environmental categories and 36 subcategories. For the whole analysis of the data were elaborated networks of the items disclosed in each company, using the software UNICET ®. The survey results showed that there is satisfactory disclosure in the categories of environmental policies and education, training and research environment. However, it was found that there is need for greater disclosure of categories of products impacts and processes in the environment, power polices and financial environmental information. It was concluded that the information disclosed in the administration reports of the companies surveyed about the environmental information do not respect the principle of full disclosure.

  19. Final Technical Report. Upgrades to Alabama Power Company Hydroelectric Developments

    Energy Technology Data Exchange (ETDEWEB)

    Crew, James F. [Southern Company Generation, Birmingham, AL (United States). Hydro Services; Johnson, Herbie N. [Southern Company Generation, Birmingham, AL (United States). Hydro Services

    2015-03-31

    From 2010 to 2014, Alabama Power Company (“Alabama Power”) performed upgrades on four units at three of the hydropower developments it operates in east-central Alabama under licenses issued by the Federal Energy Regulatory Commission (“FERC”). These three hydropower developments are located on the Coosa River in Coosa, Chilton, and Elmore counties in east-central Alabama.

  20. Analysis of relationship between the local governments and the power companies through the changes of safety agreements

    International Nuclear Information System (INIS)

    Sugawara, Shin-etsu; Inamura, Tomoaki; Kimura, Hiroshi; Madarame, Haruki

    2009-01-01

    In Japan, safety of nuclear facilities is regulated by the central government and local governments are responsible for protecting the local public. To operate nuclear facilities in local communities, local governments would conclude safety agreements with power companies. In recent years, local governments have used the safety agreements as excuse for delaying the operations of nuclear facilities. The legal basis of the safety agreements was questioned by some who considered that this was the cause of the stranded relationship between local governments and power companies, and in some cases, the interrupted nature of electricity supply. To understand the sources of this difficult relationship, safety agreements must be analyzed, although these documents may have undergone revisions, and various regulations may have changed. By analyzing the safety agreements and revisions, we found that the relationship between local governments and power companies gradually changed over time, which can be divided into the following 3 stages: (1) in the early 70s, the dawn stage when local governments groped with the situation of nuclear facilities built in their communities; (2) from late 70s to 90s, the stage when local governments demanded information, and (3) from late 90s to present, the stage when local governments demand information and trustworthiness. This paper shows the results of analyzing the relationship changes between local governments and power companies. We conclude that viewpoints of local governments on nuclear power evolve, as social responsibilities of power companies stipulated in safety agreements also evolve over time. (author)

  1. A proposal for human factors education in a power plant company

    International Nuclear Information System (INIS)

    Hikono, Masaru

    2004-01-01

    The author was asked by a power plant company to investigate how to change the actual education system concerning human factor education for the plant staff. First, the problems faced by actual education system were investigated based on the results of a large number of surveys conducted in educational fields, and various documents. In the present paper, the author describes the newly proposed educational program., using as illustration a case study. The findings of the present study suggests that, concerning the content of the educational program, it is indispensable for each company to develop a curriculum based on its specific needs. (author)

  2. 78 FR 32385 - Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC...

    Science.gov (United States)

    2013-05-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-64-000] Exelon Generation Company, LLC; CER Generation II, LLC; Constellation Mystic Power, LLC; Constellation NewEnergy...) Rules of Practice and Procedure, 18 CFR 385.207, Exelon Generation Company, LLC, CER Generation II, LLC...

  3. Perspectives at the East European engineering companies in the field of power industry in the power-plant construction globalization conditions

    International Nuclear Information System (INIS)

    Ganchev, R.

    2001-01-01

    A large group of companies, institutes, boiler and power engineering work ect. from East European countries, currently in process of reorganization or already transformed into new-established private companies and corporations possess significant intellectual property in the field of thermal power technologies and equipment and broad experience in the design and the erection of thermal power plants. In many cases this know-how is not only competitive to that of the large companies of the West and of the Far East, but frequently it also proves to have a number of advantages. However, in the years of transition in these countries and simultaneous globalization, the owners of this potentials meet with difficulties and restrictions to realize it fully. Large investment projects - for new or replacement capacities or comprehensive rehabilitation or refurbishment of TPPs - are accessible only for the financially powerful EPC-contractors and key equipment suppliers, for which large bank credits are accessible. The near future perspective, for the scientists and experts that have accumulated this capital, is in the opportunity to employ the extensive experience and know-how of this firms in the forthcoming large-scale rehabilitation projects in these countries, and primarily, in the solution of specific problems, that have not been solved so far, provided that the projects are awarded not on the basis of the financial power of the contractors but on the basis of the efficiency of the proposed original solutions

  4. 77 FR 16026 - Cargill Power Markets, LLC v. Public Service Company of New Mexico; Notice of Compliance Filing

    Science.gov (United States)

    2012-03-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-61-002] Cargill Power Markets, LLC v. Public Service Company of New Mexico; Notice of Compliance Filing Take notice that on March 12, 2012, Public Service Company of New Mexico and Cargill Power Markets, LLC submitted a...

  5. 75 FR 9618 - Virginia Electric and Power Company Surry Power Station, Unit Nos. 1 and 2 Environmental...

    Science.gov (United States)

    2010-03-03

    ... change to radioactive effluents that effect radiation exposures to plant workers and members of the.... There would be no impact to socioeconomic resources. Therefore, no changes to or different types of non...

  6. Framatome advanced nuclear power-benefits for our clients from the new company

    International Nuclear Information System (INIS)

    Weber, P.

    2001-01-01

    Framatome ANP (Advanced Nuclear Power) merges the complementary strengths of two global nuclear industry leaders Framatome and Siemens - offering clients the best technological solutions for safe, reliable and economical plant performance. With a combined workforce of 13,300 skilled individuals, Framatome ANP is now the nuclear industry's leading supplier. Serving as Original Equipment Manufacturer (OEM) for more than 90 reactors that provide about 30% of the world's total installed nuclear power capacity, our experienced resources remain focused on the local needs of individual clients, wherever in the world they may be. The Company main business used to be turnkey construction of complete Nuclear Power plants, BWR and PWR capabilities, heavy equipment manufacturing, comprehensive I and C capabilities, and also expertise and knowledge of VVER. Framatome ANP will benefit in all of its fields of activity of the experience gained through Framatome and Siemens' collaboration on the next generation reactor, the EPR, as well as on steam generators replacements and or modernization of VVER. Framatome ANP nuclear fuel designs for both PWR and BWR plants provide innovative features and world-leading performance. Framatome ANP is organized according a matrix organization with: - 4 Business Groups (Project and Engineering, Service, Nuclear Fuel, Mechanical Equipment) - 3 Regional Divisions (Framatome Advanced Nuclear Power S.A.S., France; Framatome Advanced Nuclear Power GmbH, Germany; Framatome Advanced Nuclear Power Inc., USA). By 30th January 2001 Siemens Nuclear Power GmbH, founded in 2000 as successor of the Nuclear Division of Siemens Power Generation Group (KWU), was renamed to Framatome Advanced Nuclear Power GmbH forming the German part of the world wide acting company. Over the past 40 years 23 nuclear power plants all around the world - not only pressurized and boiling water reactors, but also two heavy-watermoderated reactors have been designed, constructed and

  7. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix E (Sections E.9-E.16), Volume 2, Part 3B

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Wong, S.M.; Bley, D.; Johnson, D.

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis

  8. Evaluation of potential severe accidents during low power and shutdown operations at Surry, Unit 1: Analysis of core damage frequency from internal events during mid-loop operations. Appendix E (Sections E.9-E.16), Volume 2, Part 3B

    Energy Technology Data Exchange (ETDEWEB)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Wong, S.M. [Brookhaven National Lab., Upton, NY (United States); Bley, D.; Johnson, D. [PLG Inc., Newport Beach, CA (United States)] [and others

    1994-06-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analyses that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. In phase 2, mid-loop operation was selected as the plant configuration to be analyzed based on the results of the phase 1 study. The objective of the phase 2 study is to perform a detailed analysis of the potential accident scenarios that may occur during mid-loop operation, and compare the results with those of NUREG-1150. The scope of the level-1 study includes plant damage state analysis, and uncertainty analysis. Volume 1 summarizes the results of the study. Internal events analysis is documented in Volume 2. It also contains an appendix that documents the part of the phase 1 study that has to do with POSs other than mid-loop operation. Internal fire and internal flood analyses are documented in Volumes 3 and 4. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. Volume 6 documents the accident progression, source terms, and consequence analysis.

  9. 75 FR 76495 - Virginia Electric and Power Company North Anna Power Station, Unit Nos. 1 and 2 Surry Power...

    Science.gov (United States)

    2010-12-08

    ..., Supplement 1 and 2, ``Use of Nuclear Energy Institute (NEI) 99-01, Methodology for Development of Emergency.... Environmental Impacts of the Proposed Action The NRC has completed its environmental assessment of the proposed... NRC concludes that there are no significant environmental impacts associated with the proposed action...

  10. 78 FR 46616 - Virginia Electric and Power Company; North Anna Power Station, Units 1 and 2; Surry Power Station...

    Science.gov (United States)

    2013-08-01

    ... Nuclear Energy Institute (NEI) 99-01, Methodology for Development of Emergency Action Levels.'' The... readily accessible means available in the Control Room. Environmental Impacts of the Proposed Action The... that there are no significant environmental impacts associated with the proposed action. Environmental...

  11. Development on power distribution technologies of four electric power companies in Japan. The Tokyo Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Electric power companies have been needed to cope with various needs in accordance with the progress of highly information-oriented society, the improvement of industrial technology, and the advancement and diversification of the living environment. In such situation, the power distribution section of Tokyo Electric Power has promoted technical development, setting up following priority items to put into operation: to reduce power failure caused by works and accidents, to improve reliability in supply, to reduce costs of construction and all over business management, to serve customers to answer various needs, to develop new technology and new methods based on the medium- and long-term prospect, and so forth. Several examples of recent technical development are introduced here. They are as follows; compact equipment and materials for electric poles to match the circumstances of cities and to simplify the construction method for power distribution, a 750kVA large high-voltage power-generation truck to make provision against an emergency such as a disaster by a typhoon, a compact transformer used on the ground, a high-voltage automatic cabinet, and a detector to find the failure of indoor power distribution works in resistances in a short time. 8 figs.

  12. Virginia Power's vision of lower costs

    International Nuclear Information System (INIS)

    Anon.

    1997-01-01

    The top two positions in the 1996 annual league table of US nuclear production costs were taken by Surry at $11.45/MWh generated and North Anna at $12.64. Both are PWR plants operated by Virginia Power. This is part of a consistent pattern of good performance in recent years. In the late 1980s, however, the performance of these plants was very poor. The management changes which have brought about the transformation are examined. They include: setting goals; better teamwork; increased accountability of senior management for budgets; development and monitoring of performance indicators; running the nuclear division as a separate business; more effective maintenance and reduced outage costs. (UK)

  13. Forecasted electric power demands for the Delmarva Power and Light Company. Volume 1 and Volume 2. Documentation manual

    International Nuclear Information System (INIS)

    Estomin, S.L.; Beach, J.E.

    1990-10-01

    The two-volume report presents the results of an econometric forecast of peak load and electric power demands for the Delmarva Power and Light Company (DP ampersand L) through the year 2008. Separate sets of models were estimated for the three jurisdictions served by DP ampersand L: Delaware, Maryland and Virginia. For both Delaware and Maryland, econometric equations were estimated for residential, commercial, industrial, and streetlighting sales. For Virginia, equations were estimated for residential, commercial plus industrial, and streetlighting sales; separate industrial and commercial equations were not estimated for Virginia due to the relatively small size of DP ampersand L's Virginia Industrial load. Wholesale sales were econometrically estimated for the DP ampersand L system as a whole. In addition to the energy sales models, an econometric model of annual (summer) peak demand was estimated for the Company

  14. Northern States Power Company's open transmission tariff from a customer's perspective

    International Nuclear Information System (INIS)

    Marietta, K.E.; Achinger, S.K.

    1993-01-01

    In October of 1990, Northern States Power Company (NSP or Company), filed a unique open transmission tariff for both captive customers and through-system transactions. This is an important step towards expanding transmission services in the United States. Many individuals in the utility industry, who may be considering Imposing generation costs on transmission services, have been closely monitoring NSP's case which is currently before the Federal Energy Regulatory Commission (FERC). NSP's innovative generation costs include charges for reactive power production, frequency control, load dispatching, and load following. The results of this case may also have an important impact on the future of open transmission tariffs. Rates for these services depend on the customer's classification as either a captive or through-system consumer. The proposed tariff raises critical issues related to the costing of these transmission services. NSP's methodology has caused serious concern because the proposed tariff would increase transmission costs by an average of 53%. This paper will discuss the benefits of transmission, proposed rates, contract terms, and costing methodologies of NSP's plan

  15. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  16. Risk contribution from low power and shutdown of a pressurized water reactor

    International Nuclear Information System (INIS)

    Chu, T.L.; Pratt, W.T.

    1997-01-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (a pressurized water reactor) and Grand Gulf (a boiling water reactor), were selected for study by Brookhaven National Laboratory and Sandia National Laboratories, respectively. The program objectives included assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing estimated core damage frequencies, important accident sequences, and other qualitative and quantitative results with full power accidents as assessed in NUREG-1150. The scope included a Level 3 PRA for traditional internal events and a Level 1 PRA on fire, flooding, and seismically induced core damage sequences. 12 refs., 7 tabs

  17. Electric Holding Company Areas

    Data.gov (United States)

    Department of Homeland Security — Holding companies are electric power utilities that have a holding company structure. This vector polygon layer represents the area served by electric power holding...

  18. Level 1 probabilistic risk assessment of low power and shutdown operations at a PWR: Phase 2 results

    International Nuclear Information System (INIS)

    Chu, T.L.; Bozoki, G.; Kohut, P.; Musicki, Z.; Wong, S.M.; Yang, J.; Hsu, C.J.; Diamond, D.J.; Su, R.F.; Holmes, B.; Siu, N.; Bley, D.; Lin, J.

    1992-01-01

    As a result of the Chernobyl accident and other precursor events (e.g., Diablo Canyon), the US Nuclear Regulatory Commission's (NRC's) Office of Nuclear Regulatory Research (RES) initiated an extensive project during 1989 to carefully examine the potential risks during Low Power and Shutdown (LP ampersand S) operations. Shortly after the program began, an event occurred at the Vogtle plant during shutdown, which further intensified the effort of the LP ampersand S program. In the LP ampersand S program, one pressurized water reactor (PWR), Surry, and one boiling water reactor (BWR), Grand Gulf, were selected, mainly because they were previously analyzed in the NUREG-1150 Study. The Level-1 Program is being performed in two phases. Phase 1 was dedicated to performing a coarse screening level-1 analysis including internal fire and flood. A draft report was completed in November, 1991. In the phase 2 study, mid-loop operations at the Surry plant were analyzed in detail. The objective of this paper is to present the approach of the phase 2 study and the preliminary results and insights

  19. DEVELOPMENT OF RUSSIAN FEDERATION POWER SELLING COMPANY STRATEGIC MANAGEMENT

    Directory of Open Access Journals (Sweden)

    S. V. Grishkevich

    2011-01-01

    Full Text Available Strategic for power selling companies (PSC are buying, selling and investment activities. Buying activities are to be planned, selling activities predicted and both optimized by PSC on the basis of price and consumer number dynamics with due account of other factors. Very important is to develop the market of derivative instruments (derivatives as part of the risk management mechanism at all levels including that of the state, to use up-to-date and ecologically favorable technologies as well as renewable energy sources with due account of ecology improvement measurement costs.

  20. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1995-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  1. The development of multimedia communication system for electric power company

    Energy Technology Data Exchange (ETDEWEB)

    Woo, Hee Gon; Kim, Seong Bok [Korea Electric Power Corp. (KEPCO), Taejon (Korea, Republic of). Research Center

    1996-12-31

    It is a final report of the research project that is a development of PC-LAN based multimedia desktop conference system, which is research on the essential technologies and application and development of multimedia communication services for electric power company. This report is consisted of -Survey and study of the multimedia related technologies, -Multimedia communication protocols and network configurations, and -Design, developments of pilot model, evaluation, and applications of multimedia conference system. (author). 112 refs., 250 figs.

  2. Taiwan Power Company's power distribution analysis and fuel thermal margin verification methods for pressurized water reactors

    International Nuclear Information System (INIS)

    Huang, P.H.

    1995-01-01

    Taiwan Power Company's (TPC's) power distribution analysis and fuel thermal margin verification methods for pressurized water reactors (PWRs) are examined. The TPC and the Institute of Nuclear Energy Research started a joint 5-yr project in 1989 to establish independent capabilities to perform reload design and transient analysis utilizing state-of-the-art computer programs. As part of the effort, these methods were developed to allow TPC to independently perform verifications of the local power density and departure from nucleate boiling design bases, which are required by the reload safety evaluation for the Maanshan PWR plant. The computer codes utilized were extensively validated for the intended applications. Sample calculations were performed for up to six reload cycles of the Maanshan plant, and the results were found to be quite consistent with the vendor's calculational results

  3. 76 FR 77022 - In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2...

    Science.gov (United States)

    2011-12-09

    ... and 72-3] In the Matter of Carolina Power & Light Company, H.B. Robinson Steam Electric Plant, Unit No. 2, H. B. Robinson Steam Electric Plant, Unit 2, Independent Spent Fuel Storage Installation; Order Approving Indirect Transfer of Control of Licenses I. Carolina Power & Light Company (CP&L, the licensee) is...

  4. Transforming Ontario's Power Generation Company

    International Nuclear Information System (INIS)

    Manley, J.; Epp, J.; Godsoe, P.C.

    2004-01-01

    The OPG Review Committee was formed by the Ontario Ministry of Energy to provide recommendations and advice on the future role of Ontario Power Generation Inc. (OPG) in the electricity sector. This report describes the future structure of OPG with reference to the appropriate corporate governance and senior management structure. It also discusses the potential refurbishing of the Pickering A nuclear generating Units 1, 2 and 3. The electricity system in Ontario is becoming increasingly fragile. The province relies heavily on electricity imports and the transmission system is being pushed to near capacity. Three nuclear generating units are out of service. The problems can be attributed to the fact that the electricity sector has been subjected to unpredictable policy changes for more than a decade, and that the largest electricity generator (OPG) has not been well governed. OPG has had frequent senior management change, accountability has been weak, and cost overruns have delayed the return to service of the Pickering nuclear power Unit 4. It was noted that the generating assets owned and operated by OPG are capable of providing more than 70 per cent of Ontario's electricity supply. Decisive action is needed now to avoid a potential supply shortage of about 5,000 to 7,000 megawatts by 2007. In its current state, OPG risks becoming a burden on ratepayers. Forty recommendations were presented, some of which suggest that OPG should become a rate-regulated commercial utility focused on running and maintaining its core generating assets. This would require that the government act as a shareholder, and the company operate like a commercial business. It was also emphasized that the market must be allowed to bring in new players. refs., tabs., figs

  5. Future challenges for the management of power supply companies; Zukuenftige Herausforderungen fuer das Management von EVU

    Energy Technology Data Exchange (ETDEWEB)

    Bausch, A. [Jena Univ. (Germany). Professur fuer Allgemeine Betriebswirtschaftslehre/Internationales Management; Jacobs Univ., Bremen (Germany). Professur fuer Strategisches Management und Controlling; Werthschulte, S.; Schumacher, T. [Accenture GmbH (Germany); Holst, A. [Jena Univ. (Germany). Professur fuer Allgemeine Betriebswirtschaftslehre/Internationales Management; Fritz, T. [Jacobs Univ., Bremen (Germany). Professur fuer Strategisches Management und Controlling

    2007-06-15

    Among the challenges on power supply companies seeking profitable growth are strategic corporate development in terms of product and process innovation and the management's and employees' capacity for change. This was the outcome of a survey conducted as part of the ''Value Creator III'' study performed among 130 executives of German, Austrian and Swiss companies operating in the energy sector. Based on a review of companies' past successes and expectations for the future the study presents business models for tomorrow's energy market and classifies companies within a past-and-future portfolio according to their market prospects.

  6. An overview of training and technical communication of Chinese representative nuclear power engineering company of EPC mode

    International Nuclear Information System (INIS)

    Qi Ting; Zhang Xiangyu

    2015-01-01

    After the Fukushima severe accident, nuclear power development has been in stagnation in all over the world. The Chinese nuclear industry has a slowdown on new NPP construction. As a result, high level technique on safety and effective communication are required. For nuclear power engineering company with EPC mode, high quality on training and technical communication is the principal investment in order to achieve better service on engineering design, environmental impact assessment, environmental engineering design, and equipment supervision and so on. EPC mode requires wide range knowledge on almost every field related to nuclear on nuclear power engineering. In this paper, the author investigated the case of the only nuclear power engineering EPC company (CNPE) in China and present an overview on its training and technical communication both domestic and abroad. Basically, there are 4 main branches of training. The internal training focuses on specifically task (both management and technique), such as HSE training, QC training and quality and safety training. Long term education in the university is organized by cooperated mechanism. Code and platform training is partly carried out by international organization or company, and the experienced engineers coach makes up the other part. The communication is a large part since the EPC mode needs the information and requirements from the NPP entity, authority, and the other institutes, international organizations (like IAEA, NINE, IRSN, OECD, NRC and CEA etc.) and sometimes the public. The overview of the training and communication of the EPC company prevails the outline of its advantage on domestic communication and disadvantage on international technical communication. The paper can be a tool on the soft strength construction of company under EPC mode to broaden its business like consultation and training. Some advice is given by the author on the consultation and global communication in the future. (author)

  7. Exchange of current BPA surplus power for future power from certain companies' share of WNP-3 to settle a dispute over construction delay. Record of decision. Volume II. Exhibits

    International Nuclear Information System (INIS)

    1985-01-01

    This exchange is between BPA and Portland General Electric Company, Puget Sound Power and Light Company, and the Washington Water Power Company. Pacific Power and Light Company (Pacific) is not initially a party to the exchange. Pacific may at any time prior to January 1, 1994 elect on at least 12 months notice to enter the exchange provided that if BPA determines to resume full plant construction Pacific must elect or forego the option within 6 months after construction is resumed. If the plant is terminated at a time when the option has not been exercised, the option may not thereafter be exercised. If Pacific elects to make the exchange effective and the plant is later terminated prior to the effective data of the exchange, the exchange will become effective on the specified data, unless, prior to such data. Pacific notifies BPA that is rescinds such prior election

  8. Poison pills: A defensive measure against a hostile takeover or a demonstration of power of the target company

    Directory of Open Access Journals (Sweden)

    Jovanović-Zattila Milena

    2014-01-01

    Full Text Available The balance of power is particularly at stake in hostile takeovers, which makes the issue of establishing the balance of power one of the most controversial issues in the contemporary company law. In the circumstances of direct market competition and the need to have a dominant market position, companies are necessarily forced to constantly upgrade and advance their offensive and defensive methods, techniques and strategies. In order to prevent a hostile takeover, the target company may resort to an array of defence mechanisms, the most prominent of which are 'poison pills'. In spite of being perceived as the most powerful tool for obstructing hostile takeovers (and commonly designated as the 'Holy Grail' among the defensive mechanisms, there are many pros and cons underlying their application. One of the positive effects of using the poison pills is that the fear of takeovers makes the target company management more disciplined and efficient in business operations. The negative consequences are reflected in the relationship between the company board of directors and the shareholders. The target company management makes a unilateral decision on using a poison pill and this decision does not have to be approved by the shareholders in the General Meeting; however, this is highly inconsistent with the basic principles of corporate governance. The asymmetry of information, where the management (an agent has disproportionately more relevant information at its disposal than the shareholders (principals, generates a conflict between the management and the shareholders. In company law, this agency problem is generally known as the principal-agent problem, which is most prominent in a takeover. Poison pills are often associated with the discrimination of the target company shareholders, but not necessarily. The controversial nature of this defensive measure which can be applied by the target company has given rise to numerous debates on the need to

  9. Measuring efficiency and productivity change in power electric generation management companies by using data envelopment analysis: A case study

    International Nuclear Information System (INIS)

    Fallahi, Alireza; Ebrahimi, Reza; Ghaderi, S.F.

    2011-01-01

    This paper provides an empirical analysis of the determinants of energy efficiency in 32 power electric generation management companies over the period 2005–2009. The study uses non-parametric Data Envelopment Analysis (DEA) to estimate the relative technical efficiency and productivity change of these companies. In order to verify the stability of our DEA model and the importance of each input variable, a stability test is also conducted. The results of the study indicate that average technical efficiency of companies decreased during the study period. Nearly half of the companies (14) are below this average level of 88.7% for five years. Moreover, it is shown that the low increase of productivity changes is more related to low efficiency rather than technology changes. -- Highlights: ► DEA was applied on the 32 power electric generation management companies. ► A stability test is applied to verify the stability of DEA model. ► Average technical efficiency of companies decreased during the study period. ► The low increase of productivity changes is more related to low efficiency changes.

  10. Effort to grapple with improvement of security and reliability of nuclear power plant. Actions of the Japan Atomic Power Company

    International Nuclear Information System (INIS)

    Ishiguma, Kazuo

    2012-01-01

    Following the Great Tohoku Earthquake in 2011, Tokai No.2 reactor was shut down automatically. Three of emergency diesel generators worked automatically at loss-of-offsite-power and began to work the cooling system of reactor. The reactor could be kept stable and safe in cold state by management of power from the gas turbine electric generator and power source car. Actions of Japan Atomic Power Company (JAPC) for cold shutdown and Tsunami were stated. Inspection results after the earthquake and testimony of staff was described. Countermeasure of improvement of safety of nuclear power station is explained by ensuring of power source and water supply, crisis management system, countermeasure of accident, ensuring, and training of workers, and action for better understanding of reliance. (S.Y.)

  11. The effect of electric transmission constraints on how power generation companies bid in the Colombian electrical power market

    Directory of Open Access Journals (Sweden)

    Luis Eduardo Gallego Vega

    2010-05-01

    Full Text Available This paper presents the results of research about the effect of transmission constraints on both expected electrical energy to be dispatched and power generation companies’ bidding strategies in the Colombian electrical power market. The proposed model simulates the national transmission grid and economic dispatch by means of optimal power flows. The proposed methodology allows structural problems in the power market to be analyzed due to the exclusive effect of trans- mission constraints and the mixed effect of bidding strategies and transmission networks. A new set of variables is proposed for quantifying the impact of each generation company on system operating costs and the change in expected dispatched energy. A correlation analysis of these new variables is presented, revealing some interesting linearities in some generation companies’ bidding patterns.

  12. The Northern States Power Company welding manual advisor

    International Nuclear Information System (INIS)

    Lu, Yi; Wood, R.M.

    1993-01-01

    The Welding Manual Advisor (WMA) is an object oriented expert system designed to assist Northern States Power (NSP) personnel in implementing the company's Welding Manual. The expert system captures the knowledge of welding experts, addresses important issues in welding activities and automates the use of the Welding Manual. It is estimated that use of the WMA will save $81,000 over the next six years at NSP, because of the reduction of labor and errors in the use of the Welding Manual, and facilitation of training of NSP personnel. The important features of the WMA include the accuracy and consistency in determining welding procedure and requirements, update capability, user friendly interface, on-line help function, back-up capability, and well-documented manuals

  13. Time/motion observations and dose analysis of reactor loading, transportation, and dry unloading of an overweight truck spent fuel shipment

    International Nuclear Information System (INIS)

    Hostick, C.J.; Lavender, J.C.; Wakeman, B.H.

    1992-04-01

    This document presents observed activity durations and radiation dose analyses for an overweight truck shipment of pressurized water reactor (PWR) spent fuel from the Surry Power Station in Virginia to the Idaho National Engineering Laboratory. The shipment consisted of a TN-8L shipping cask carrying three 9-year-old PWR spent fuel assemblies. Handling times and dose analyses for at-reactor activities were completed by Virginia Electric and Power Company (Virginia Power) personnel. Observations of in-transit and unloading activities were made by Pacific Northwest Laboratory (PNL) personnel, who followed the shipment for approximately 2800 miles and observed cask unloading activities. In-transit dose estimates were calculated using dose rate maps provided by Virginia Power for a fully loaded TN-8L shipping cask. The dose analysis for the cask unloading operations is based on the observations of PNL personnel

  14. 77 FR 42715 - Lockhart Power Company, Inc.; Notice of Application Ready for Environmental Analysis and...

    Science.gov (United States)

    2012-07-20

    ...(r). h. Applicant Contact: Bryan D. Stone, Chief Operating Officer, Lockhart Power Company, Inc., 420... paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal...

  15. The recent activities of nuclear power globalization. Our provision against global warming by global deployment of our own technologies as integrated nuclear power plant supply company'

    International Nuclear Information System (INIS)

    Yamauchi, Kiyoshi; Suzuki, Shigemitsu

    2008-01-01

    Mitsubishi Heavy Industries, Ltd. (MHI) is striving to expand and spread nuclear power plants as an 'Integrated Nuclear Power Plant Supply Company' based on its engineering, manufacturing, and technological support capabilities. The company also has ample experience in the export of major components. MHI is accelerating its global deployment through the market introduction of large-sized strategic reactor US-APWR, the joint development of a mid-sized strategic reactor ATMEA1 with AREVA, and a small strategic reactor PBMR. The company also plans to internationally deploy technologies for the nuclear fuel cycle. We present here the leading-edge trends in the global deployment of these nuclear businesses, all of which help to solve the energy and environmental issues in the world. (author)

  16. Cost structure analysis of commercial nuclear power plants in Japan based on corporate financial statements of electric utility companies

    International Nuclear Information System (INIS)

    Kunitake, Norifumi; Nagano, Koji; Suzuki, Tatsujiro

    1998-01-01

    In this paper, we analyze past and current cost structure of commercial nuclear power plants in Japan based on annual corporate financial statements published by the Japanese electric utility companies, instead of employing the conventional methodology of evaluating the generation cost for a newly constructed model plant. The result of our study on existing commercial nuclear plants reveals the increasing significance of O and M and fuel cycle costs in total generation cost. Thus, it is suggested that electric power companies should take more efforts to reduce these costs in order to maintain the competitiveness of nuclear power in Japan. (author)

  17. Cost efficiency of Japanese steam power generation companies: A Bayesian comparison of random and fixed frontier models

    Energy Technology Data Exchange (ETDEWEB)

    Assaf, A. George [Isenberg School of Management, University of Massachusetts-Amherst, 90 Campus Center Way, Amherst 01002 (United States); Barros, Carlos Pestana [Instituto Superior de Economia e Gestao, Technical University of Lisbon, Rua Miguel Lupi, 20, 1249-078 Lisbon (Portugal); Managi, Shunsuke [Graduate School of Environmental Studies, Tohoku University, 6-6-20 Aramaki-Aza Aoba, Aoba-Ku, Sendai 980-8579 (Japan)

    2011-04-15

    This study analyses and compares the cost efficiency of Japanese steam power generation companies using the fixed and random Bayesian frontier models. We show that it is essential to account for heterogeneity in modelling the performance of energy companies. Results from the model estimation also indicate that restricting CO{sub 2} emissions can lead to a decrease in total cost. The study finally discusses the efficiency variations between the energy companies under analysis, and elaborates on the managerial and policy implications of the results. (author)

  18. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  19. New maintenance strategy of Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant for effective ageing management and safe long-term operation

    International Nuclear Information System (INIS)

    Inagaki, Takeyuki; Yamashita, Norimichi

    2009-01-01

    Fukushima Dai-ichi Nuclear Power Plant is the oldest among three nuclear power plants owned and operated by Tokyo Electric Power Company, which consists of six boiling water reactor units. The commercial operation of Unit 1 was commenced in 1971 (37 years old) and Unit 6 in 1978 (29 years old). Currently ageing degradations of systems, structures and components are managed through maintenance programs, component replacement/refurbishment programs and long-term maintenance plans. The long-term maintenance plans are established through ageing management component replacement/refurbishment programs reviews performed before the 30th year of operation and they are for safe and reliable operation after 30 years (long-term operation). However the past maintenance actions and past component replacement/refurbishment programs were not always proactive and past operational experience and maintenance practices suggest that effective/proactive ageing management programs be introduced in earlier stage of the plant operation. In this circumstance, Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant are setting up a new maintenance strategy that includes 1) improving the normal maintenance programs by using ageing degradation data, 2) effective use of information on internal/external operational experience and maintenance practices related to ageing, and 3) proactive component/equipment refurbishment programs during a refreshment outage for safe and reliable long-term operation. To accomplish the goal of this strategy, strengthening engineering capability of plant staff members is a crucial required for the plant. The objective of this paper is to briefly explain main results ageing management reviews, past and current significant ageing issues and management programs against them, and the new maintenance strategy established by Tokyo Electric Power Company and Fukushima Dai-ichi Nuclear Power Plant. (author)

  20. Orcas Power and Light Company [fourth quarterly] technical progress report, July--September 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-12-31

    After a year of operating the G-Van, OPALCO concluded that the company transportation needs were not being met by the G-Van. The previous quarterly report mentioned battery problems with the Solectria (No. 51). This problem is one of reduced range and power and has been determined to be caused by one or more individual monoblock failures. The local Solectria representative and Solectria headquarters personnel have been aware of this unsatisfactory condition and are continuing their attempt to solve it. The Solectria and G-Van continue to be used intermittently by company personnel for errands and engineering trips. Generally, the smaller, compact size of the Solectria make it the most preferred by company drivers. Clearly the G-Van is not selected for use because of its size and weight. It is important to note that the driver dissatisfaction is not related to the fact that it is an electric van, but more its lack of maneuverability.

  1. Orcas Power and Light Company [fourth quarterly] technical progress report, July--September 1992

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    After a year of operating the G-Van, OPALCO concluded that the company transportation needs were not being met by the G-Van. The previous quarterly report mentioned battery problems with the Solectria (No. 51). This problem is one of reduced range and power and has been determined to be caused by one or more individual monoblock failures. The local Solectria representative and Solectria headquarters personnel have been aware of this unsatisfactory condition and are continuing their attempt to solve it. The Solectria and G-Van continue to be used intermittently by company personnel for errands and engineering trips. Generally, the smaller, compact size of the Solectria make it the most preferred by company drivers. Clearly the G-Van is not selected for use because of its size and weight. It is important to note that the driver dissatisfaction is not related to the fact that it is an electric van, but more its lack of maneuverability.

  2. Surry Power Station, Units 1 and 2. Semiannual operating report, January--June 1975

    International Nuclear Information System (INIS)

    1975-01-01

    Net electric power generated by Unit 1 was 2,315,124 MWH(e) and Unit 2 generated 2,062,954 MWH(e) with Unit 1 generator on line for 3,157.8 hrs and Unit 2 on line for 2,881.2 hrs. Information is presented concerning power generation, shutdowns, corrective maintenance, chemistry and radiochemistry, occupational radiation exposure, release of radioactive materials, abnormal occurrences, and environmental monitoring. (FS)

  3. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  4. Centralized vs. decentralized thermal IR inspection policy: experience from a major Brazilian electric power company

    Science.gov (United States)

    dos Santos, Laerte; da Costa Bortoni, Edson; Barbosa, Luiz C.; Araujo, Reyler A.

    2005-03-01

    Furnas Centrais Elétricas S.A is one of the greatest companies of the Brazilian electric power sector and a pioneer in using infrared thermography. In the early 70s, the maintenance policy used was a centralized approach, with only one inspection team to cover all the company"s facilities. In the early 90s, FURNAS decided to decentralize the thermography inspections creating several inspection teams. This new maintenance policy presented several advantages when compared to the previous one. However the credibility of the results obtained with the thermal inspection was frequently being questioned, in part due to the lack of a detailed planning to carry out the transition from the centralized inspection to the decentralized one. In some areas of the company it was suggested the inactivation of the thermography. This paper presents the experience of FURNAS with these different maintenance policies and details the procedures which have been taken that nowadays the infrared thermal inspection has become one of the most important techniques of predictive maintenance in the company.

  5. 75 FR 82414 - Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Science.gov (United States)

    2010-12-30

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2010-0062] Carolina Power & Light Company; H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light... authorizes operation of the H.B. Robinson Steam Electric Plant, Unit 2 (HBRSEP). The license provides, among...

  6. 75 FR 11579 - Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption

    Science.gov (United States)

    2010-03-11

    ... NUCLEAR REGULATORY COMMISSION [Docket No. 50-261; NRC-2010-0062] Carolina Power & Light Company H. B. Robinson Steam Electric Plant, Unit No. 2; Exemption 1.0 Background Carolina Power & Light... of the H. B. Robinson Steam Electric Plant, Unit 2 (HBRSEP). The license provides, among other things...

  7. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested parties to attend a teleconference from...

  8. Modification of reactor installation in the Genkai nuclear power plant No. 1 of Kyushu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 25, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Genkai nuclear power plant No. 1 of the Kyushu Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kyushu Electric Power Company, Inc., to the Minister of International Trade and Industry on July 24, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  9. Measuring sustainability by Energy Efficiency Analysis for Korean Power Companies: A Sequential Slacks-Based Efficiency Measure

    Directory of Open Access Journals (Sweden)

    Ning Zhang

    2014-03-01

    Full Text Available Improving energy efficiency has been widely regarded as one of the most cost-effective ways to improve sustainability and mitigate climate change. This paper presents a sequential slack-based efficiency measure (SSBM application to model total-factor energy efficiency with undesirable outputs. This approach simultaneously takes into account the sequential environmental technology, total input slacks, and undesirable outputs for energy efficiency analysis. We conduct an empirical analysis of energy efficiency incorporating greenhouse gas emissions of Korean power companies during 2007–2011. The results indicate that most of the power companies are not performing at high energy efficiency. Sequential technology has a significant effect on the energy efficiency measurements. Some policy suggestions based on the empirical results are also presented.

  10. Section 1: Company directory

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This is a 1992 directory of those companies doing business in all areas of the independent power producers industry. The listing includes the company name, address, telephone and FAX numbers, and the name of a company contact. The listing is international in scope

  11. Commercial Aircraft Airframe Fuel Systems Survey and Analysis.

    Science.gov (United States)

    1982-07-01

    Type of Report end Period Covered Ag Sponsorin ncy Na.e and Address FINAL REPORT U.S. DEPARTMENT OF TRANSPORTATION October, 1980 - June, 1982 FEDERAL...Philadelphia, Pennsylvania Weybridge, Surry England KT130SF Mr. Roy Riseley Mr. William Miles de Havilland Aircraft Cessna Aircraft Company Garratt Blvd. Wallace...Guido F. Pesotti Mr. Frank C. Davis Technical Director Engineering Specialist Empresa Brasileira Aeronautica, S.A. Garrett Turbine Engine Company

  12. Owners of nuclear power plants: Percentage ownership of commercial nuclear power plants by utility companies

    International Nuclear Information System (INIS)

    Wood, R.S.

    1987-08-01

    The following list indicates percentage ownership of commercial nuclear power plants by utility companies as of June 1, 1987. The list includes all plants licensed to operate, under construction, docked for NRC safety and environmental reviews, or under NRC antitrust review. It does not include those plants announced but not yet under review or those plants formally canceled. In many cases, ownership may be in the process of changing as a result of altered financial conditions, changed power needs, and other reasons. However, this list reflects only those ownership percentages of which the NRC has been formally notified. Part I lists plants alphabetically with their associated applicants/licensees and percentage ownership. Part II lists applicants/licensees alphabetically with their associated plants and percentage ownership. Part I also indicates which plants have received operating licenses (OL's). Footnotes for both parts appear at the end of this document

  13. Service hall in Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc

    International Nuclear Information System (INIS)

    Tawara, Shigesuke

    1979-01-01

    There are six BWR type nuclear power plants in the Number 1 Fukushima Nuclear Power Station, Tokyo Electric Power Company, Inc. The service hall of the station is located near the entrance of the station. In the center of this service hall, there is the model of a nuclear reactor of full scale. This mock-up shows the core region in the reactor pressure vessel for the number one plant. The diameter and the thickness of the pressure vessel are about 5 m and 16 cm, respectively. The fuel assemblies and control rods are set just like the actual reactor, and the start-up operation of the reactor is shown colorfully and dynamically by pushing a button. When the control rods are pulled out, the boiling of water is demonstrated. The 1/50 scale model of the sixth plant with the power generating capacity of 1100 MWe is set, and this model is linked to the mock-up of reactor written above. The operations of a recirculating loop, a turbine and a condenser are shown by switching on and off lamps. The other exhibitions are shielding concrete wall, ECCS model, and many kinds of panels and models. This service hall is incorporated in the course of study and observation of civics. The good environmental effects to fishes and shells are explained in this service hall. Official buildings and schools are built near the service hall utilizing the tax and grant concerning power generation. This service hall contributes to give much freedom from anxiety to the public by the tour. (Nakai, Y.)

  14. Assessment of the potential for high-pressure melt ejection resulting from a Surry station blackout transient

    International Nuclear Information System (INIS)

    Knudson, D.L.; Dobbe, C.A.

    1993-11-01

    Containment integrity could be challenged by direct heating associated with a high pressure melt ejection (HPME) of core materials following reactor vessel breach during certain severe accidents. Intentional reactor coolant system (RCS) depressurization, where operators latch pressurizer relief valves open, has been proposed as an accident management strategy to reduce risks by mitigating the severity of HPME. However, decay heat levels, valve capacities, and other plant-specific characteristics determine whether the required operator action will be effective. Without operator action, natural circulation flows could heat ex-vessel RCS pressure boundaries (surge line and hot leg piping, steam generator tubes, etc.) to the point of failure before vessel breach, providing an alternate mechanism for RCS depressurization and HPME mitigation. This report contains an assessment of the potential for HPME during a Surry station blackout transient without operator action and without recovery. The assessment included a detailed transient analysis using the SCDAP/RELAP5/MOD3 computer code to calculate the plant response with and without hot leg countercurrent natural circulation, with and without reactor coolant pump seal leakage, and with variations on selected core damage progression parameters. RCS depressurization-related probabilities were also evaluated, primarily based on the code results

  15. Report from investigation committee on the accident at the Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    Koshizuka, Seiichi

    2012-01-01

    Government's Investigation Committee on the Accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company published its final report on July 23, 2012. Results of investigation combined final report and interim report published on December 26, 2011. The author was head of accident accuse investigation team mostly in charge of site response, prior measure and plant behavior. This article reported author related technical investigation results focusing on site response and prior measures against tsunamis of units 1-3 of Fukushima Nuclear Power Stations. Misunderstanding of working state of isolation condenser of unit 1, unsuitability of alternative water injection at manual stop of high-pressure coolant injection (HPCI) system of unit 3 and improper prior measure against tsunami and severe accident were pointed out in interim report. Improper monitoring of suppression chamber of unit 2 and again unsuitable work for HPCI system of unit 3 were reported in final report. Thorough technical investigation was more encouraged to update safety measures of nuclear power stations. (T. Tanaka)

  16. An FAHP-TOPSIS framework for analysis of the employee productivity in the Serbian electrical power companies

    Directory of Open Access Journals (Sweden)

    Snezana Pavle Knezevic

    2017-09-01

    Full Text Available The aim of this paper is to apply an integrated model, which combines methods of classical and fuzzy Multi-criteria decision making (MCDM in selected six large equity companies from the Serbian energy sector. The data considered are retrieved from the official financial statements. Four main criteria were analyzed, identified by the previous researchers and pointing to the employees productivity: Operating income/Number of employees, Equity/Number of employees, Net income/Number of employees and Total assets/Number of employees. The contribution of this paper lies in the application of a hybrid model that integrates two MCDM methods: Fuzzy Analytic Hierarchy Process (FAHP and Technique for Order Performance by Similarity to Ideal Solution (TOPSIS to analyse the employee productivity in selected D-Electrical power supply companies operating in Serbia. The FAHP is an effective method for mathematical representation of uncertain and imprecise evaluations made by humans, while the TOPSIS method is an efficient way to rank the alternatives. Results show that operating income is of highest importance for estimating employee productivity and decision making, while equity is of the weakest. Furthermore, the most productive operations in large enterprises from selected companies of the sector D-Electrical power supply are found in the company PC EPS Beograd, and the lowest are in the ED Center llc Kragujevac.

  17. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  18. 78 FR 49305 - Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2...

    Science.gov (United States)

    2013-08-13

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-445 and 50-446; NRC-2013-0182] Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2; Application for Amendment to Facility... Operating License Nos. NPF-87 and NPF-89 for the Comanche Peak Nuclear Power Plant, Unit Nos. 1 and 2...

  19. The roles played by the Canadian General Electric Company's Atomic Power Department in Canada's nuclear power program: work, organization and success in APD, 1955-1995

    International Nuclear Information System (INIS)

    Cantello, G.W.

    2003-01-01

    This thesis explores the roles played by the Canadian General Electric Company's Atomic Power Department (APD) in Canada's distinctive nuclear power program. From the establishment of APD in 1955 until the completion of the KANUPP project in Pakistan in 1972, the company's strategy encompassed the design, manufacture, and commissioning of entire nuclear power projects in Canada and abroad. APD then developed a specialized role in the design and supply of complete nuclear fuel handling systems, nuclear fuel bundles, and service work, that sustained a thriving workplace. Five key factors are identified as the reasons behind the long and successful history of the department: (1) Strong, capable and efficient management from the start, (2) Flexible organizational structure, (3) Extremely competent design group, (4) Excellent manufacturing, test, commissioning and service capabilities, (5) Correctly identifying, at the right time, the best fields in which to specialize. (author)

  20. Maintenance of fire systems and equipment at Virginia Power

    International Nuclear Information System (INIS)

    Doubrely, E.B. Jr.

    1989-01-01

    The basics of fire protection systems maintenance are well codified and documented in the National Fire Codes published by the National Fire Protection Association. In addition, Insurers often promulgate minimum standards for fire protection systems design and maintenance to which they attach conditions of insurability. Regulatory agencies and even in-house corporate policies can impact the maintenance of fire protection systems and equipment. This presentation will focus on the various methods and alternate ways of performing system maintenance, whether required by code, insurer, or by some regulatory commitment at Virginia Powers North Anna and Surry nuclear power stations. The approach to performing similar work is handled differently at each station. This difference can be attributed to proximity to outside assistance as well as plant philosophy. In addition to station maintenance practices, a discussion of in-house servicing of portable fire suppression equipment is offered. 1 tab

  1. A three-stage short-term electric power planning procedure for a generation company in a liberalized market

    International Nuclear Information System (INIS)

    Nabona, Narcis; Pages, Adela

    2007-01-01

    In liberalized electricity markets, generation companies bid their hourly generation in order to maximize their profit. The optimization of the generation bids over a short-term weekly period must take into account the action of the competing generation companies and the market-price formation rules and must be coordinated with long-term planning results. This paper presents a three stage optimization process with a data analysis and parameter calculation, a linearized unit commitment, and a nonlinear generation scheduling refinement. Although the procedure has been developed from the experience with the Spanish power market, with minor adaptations it is also applicable to any generation company participating in a competitive market system. (author)

  2. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  3. 78 FR 26401 - Connecticut Yankee Atomic Power Company, Haddam Neck Plant, Environmental Assessment and Finding...

    Science.gov (United States)

    2013-05-06

    ... Atomic Power Company, Haddam Neck Plant, Environmental Assessment and Finding of No Significant Impact... Neck Plant (HNP) Independent Spent Fuel Storage Installation (ISFSI). CYAPCO stated that the exemption...-rm/adams.html . From this site, you can access the NRC's ADAMS, which provides text and image files...

  4. Performance of the Electric power companies of Burkina Faso, the Ivory Coast, Mali and Senegal, and their organizational models

    International Nuclear Information System (INIS)

    Girod, J.

    1993-01-01

    The history of the technical, economic, and financial performances of these four countries' power companies over the past two decades is recounted, and then interpreted as the result of the existing organizational models. The changes that have occurred can be understood in long-term perspective by comparing the performance of these companies to the characteristics, rules, and objectives used to define the models, which also helps explain the history of performance indicator variations. Two models are defined: one for the physical plant and one for the management. These correspond to two successive phases in the organization and operation of the electrical sector. Rural electrification and regional interconnection will be important factors in any new model or models developed for the future, because the forms they take is likely to modify the characteristics of these national power companies. 26 refs., 1 fig., 3 tabs

  5. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...

  6. Health physics practices and experience at Duke Power Company

    International Nuclear Information System (INIS)

    Lewis, L.

    1986-01-01

    The history and development of the health physics and as-low-as-reasonably-achievable (ALARA) program at Duke Power Company's Oconee Nuclear Station is described as are the fundamental elements of the program and how the program works. The benefits of this health physics/ALARA program have been determined to be (a) improved quality of manpower planning and scheduling, (b) increased efficiency of shutdown activities, (c) reduced cost of shutdown, (d) immediate awareness of adverse job exposure trends, (e) better management information on exposure-related problems, (f) improved accuracy of personnel and job dose records, and (g) in general, improved outage performance and subsequent plant operation. Experience with the health physics/ALARA program is discussed in terms of (a) savings of critical path time, (b) maintaining ALARA personnel doses, and (c) record capacity factors

  7. 76 FR 71014 - Idaho Power Company, IDACORP Energy, L.P., IDACORP, Inc.; Notice of Petition

    Science.gov (United States)

    2011-11-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IN03-9-000] Idaho Power Company, IDACORP Energy, L.P., IDACORP, Inc.; Notice of Petition Take notice that on September 9, 2011..., 2003,\\1\\ filed a petition to terminate Appendix B, Appendix C, and Appendix E to the Settlement...

  8. Safety evaluation report: related to the operation of Perry Nuclear Power Plant, Units 1 and 2, Docket Nos. 50-440 and 50-441, Cleveland Electric Illuminating Company

    International Nuclear Information System (INIS)

    1982-08-01

    Supplement No. 1 to the Safety Evaluation Report on the application filed by the Cleveland Electric Illuminating Company on behalf of itself and as agent for the Duquesne Light Company, the Ohio Edison Company, the Pennsylvania Power Company, and the Toledo Edison Company (the Central Area Power Coordination Group, CAPCO), as applicants and owners, for a license to operate the Perry Nuclear Power Plant, Units 1 and 2 (Docket Nos. 50-440 and 441). The facility is located near Lake Erie in Lake County, Ohio. This supplement has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission and reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  9. Assessment of the potential for HPME during a station blackout in the Surry and Zion PWRS

    International Nuclear Information System (INIS)

    Knudson, D.L.; Bayless, P.D.; Dobbe, C.A.; Odar, F.

    1994-01-01

    The integrity of a PWR (pressurized water reactor) containment structure could be challenged by direct heating associated with a HPME (high pressure melt ejection) of core materials following reactor vessel lower head breach during certain severe accidents. Structural failure resulting from direct containment heating is a contributor to the risk of operating a PWR. Intentional RCS (reactor coolant system) depressurization, where operators latch pressurizer relief valves open, has been proposed as an accident management strategy to reduce those risks by mitigating the severity of the HPME. However, decay heat levels, valve capacities, and other plant-specific characteristics determine whether the required operator action will be effective. Without operator action, natural circulation flows could heat ex-vessel RCS pressure boundaries (surge line and hot leg piping, steam generator tubes, etc.) to the point of failure before failure of the lower head providing an unintentional mechanism for depressurization and HPME mitigation. This paper summarizes an assessment of RCS depressurization with respect to the potential for HPME during a station blackout in the Surry and Zion PWRs. The assessment included a detailed transient analysis using the SCDAP/RELAP5/MOD3 computer code and an evaluation of RCS depressurization-related probabilities primarily based on the code results

  10. Evaluation of Risks Related To Russian Power Grid Companies by Foreign Investors

    Directory of Open Access Journals (Sweden)

    Daria L. Val'kova

    2016-01-01

    Full Text Available The article focuses on the impact of the current crisis on evaluation of risks related to Russian power grid companies by foreign investors as well as on prospects of raising foreign capital. The current situation resulted in a considerable deterioration of investment climate in Russia as well as in aggravation of industry-specific problems. Inflation growth, devaluation of the national currency, GDP decrease, drop in electricity consumption and the crisis in the banking sector negatively impact the investment profile of the country. This leads to increased risk premium for foreign capital investments in any type of Russian assets. At the same time industry-specific problems augmented as well. Those are primarily lack of transparency in regulation, which is subject to constant changes, growth in overdue receivables, limited access to modern technologies. All of the above had a considerable impact on the perception of Russian risks by international investors. A comprehensive approach is needed to improve the investment climate in the country and this would be largely defined by the general macroeconomic development of the Russian Federation and relations with other states. Consistent strategy and integrated actions of the Government and respective Ministries are of particular importance. As for the industry-specific factors, transparent and well-balanced long-term tariff system is the key condition for sustainable improvement of the situation in the sector, according to the major industry participants and leading experts. Thus, the article highlights changes in investor perception of the Russian power grid sector as well as relative impact on the industry development prospects. This analysis is the basis for further elaboration of recommendations regarding easing off of the crisis impact on the power grid companies as well as for assessment of prospects of meeting strategic industry development objectives.

  11. 75 FR 7471 - Chandra Coffee and Rabun Boatworks, Complainants v. Georgia Power Company, Respondent; Notice of...

    Science.gov (United States)

    2010-02-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2354-10] Chandra Coffee and Rabun Boatworks, Complainants v. Georgia Power Company, Respondent; Notice of Complaint February 3, 2010. Take notice that on December 14, 2009, as amended on January 8, 2010, Chandra Coffee and Rabun...

  12. 75 FR 57746 - Lockhart Power Company; Notice of Application Tendered for Filing With the Commission, Soliciting...

    Science.gov (United States)

    2010-09-22

    .... Applicant Contact: Bryan D. Stone, Chief Operating Officer, Lockhart Power Company, Inc., 420 River Street... Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy...

  13. Probabilistic safety assessment support for the maintenance rule at Duke Power Company

    International Nuclear Information System (INIS)

    Brewer, H. Duncan; Canady, Ken S.

    1999-01-01

    The Nuclear Regulatory Commission (NRC) published the Maintenance Rule on July 10, 1991 with an implementation date of July 10, 1996 . Maintenance rule implementation at the Duke Power Company has used probabilistic safety assessment (PSA) insights to help focus the monitoring of structures, systems and components (SSC) performance and to ensure that maintenance is effectively performed. This paper describes how the probabilistic risk assessment (PRA) group at the Duke Power Company provides support for the maintenance rule by performing the following tasks: (1) providing a member of the expert panel; (2) determining the risk-significant SSCs; (3) establishing SSC performance criteria for availability and reliability; (4) evaluating past performance and its impact on core damage risk as part of the periodic assessment; (5) providing input to the PRA matrix; (6) providing risk analyses of combinations of SSCs out of service; (7) providing support for the SENTINEL program; and (8) providing support for PSA training. These tasks are not simply tied to the initial implementation of the rule. The maintenance rule must be kept consistent with the current design and operation of the plant. This will require that the PRA models and the many PSA calculations performed to support the maintenance rule are kept up-to-date. Therefore, support of the maintenance rule will be one of the primary roles of the PSA group for the remainder of the life of the plant

  14. 76 FR 7840 - American Hydro Power Company; Notice of Termination of Exemption by Implied Surrender and...

    Science.gov (United States)

    2011-02-11

    ... Power Company; Notice of Termination of Exemption by Implied Surrender and Soliciting Comments, Protests... the Commission: a. Type of Proceeding: Termination of exemption by implied surrender. b. Project No... if any term or condition of the exemption is violated. The project has not operated since 2004, and...

  15. Setting of cesium residual ratio of molten solidified waste produced in Japan Atomic Power Company Tokai and Tokai No.2 Power Stations

    International Nuclear Information System (INIS)

    2013-02-01

    JNES investigated the appropriateness of a view of the Japan Nuclear Fuel Co. on cesium residual content and the radioactivity measurement precision regarding the molten solidified (with lowered inorganic salt used) radioactive wastes which were produced from Japan Atomic Power Company Tokai and Tokai No. 2 Power Stations. Based on the written performance report from the request and past disposal confirmation experience, a view of the JNFC is confirmed as appropriate that setting of 15% cesium residual ratio for molten solidified with volume ratio larger than 4% and less than 10% cases. (S. Ohno)

  16. 78 FR 14361 - In the Matter of Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Units 1 and...

    Science.gov (United States)

    2013-03-05

    ... NUCLEAR REGULATORY COMMISSION [NRC-2012-0310; Docket Nos. 50-445 and 50-446; License Nos. NPF-87 and NPF-89] In the Matter of Luminant Generation Company LLC, Comanche Peak Nuclear Power Plant, Units... Nuclear Power Plant, Units 1 and 2 (CPNPP), and its Independent Spent Fuel Storage Installation Facility...

  17. Inquiry relating to modifications of reactor installation in Ikata No. 1 and 2 nuclear power plants of Shikoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modifications of reactor installation in the Ikata No. 1 and 2 nuclear power plants of the Shikoku Electric Power Company, Inc., on February 13, 1979, from the president of the company. After the safety evaluation was finished by the Ministry of International Trade and Industry, inquiry was conducted to the Atomic Energy Safety Commission (AESC) on June 15, 1979, from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on June 19, 1979. The modifications of the reactor installation are the increase of new fuel storage capacity from about 1/3 to about 2/3 of in-core fuel for No. 1 plant and the modification of driving mechanism from the roller nut type to the magnetic jack type for the control rod cluster for adjusting power distribution in the No. 2 plant. The contents of the safety examination for each item written above are presented. The prevention of criticality is carefully practiced for the new fuel storage by putting fuel assemblies in stainless steel can type racks and locating the fuel assemblies at the proper distance. Relating to the driving mechanism for the control rod cluster adjusting power distribution, the driving speed is not modified and the reliability is kept by carrying out the continuous operation test and the electric power black out test as the demonstration test. The magnetic jack type mechanism has the locking device to prevent reactor tripping at the time of electric power black out, and the cluster is held at the location where the cluster existed at the time of black out. (Nakai, Y.)

  18. Stainless steel pool constructing technology and management of Fangjiashan Nuclear Power Company

    International Nuclear Information System (INIS)

    Wei Lianfeng; Wang Qun

    2013-01-01

    The construction of Fangjiashan nuclear power plant stainless steel cladding has been taken much attention. Based on the careful analysis of stainless steel cladding welding and construction main issues; Many measures have been taken such as welding technology, construction process, the stress control of welding deformation, the cleanliness control of construction process, install precision control, improvements of Non-destructive testing, product protection, etc. And installation methods and techniques have been improved and innovative, the installation quality of stainless steel cladding has been enhanced. At the same time, as owners of the plants, we explored the methods of quality supervision and control, together with the relevant units; and sense of quality management has been unified effectively, made stainless steel cladding quality getting better and better. Fangjiashan nuclear power stainless steel cladding construction quality and management experience has been highly recognized by every company. (authors)

  19. Electric utility companies and geothermal power

    Science.gov (United States)

    Pivirotto, D. S.

    1976-01-01

    The requirements of the electric utility industry as the primary potential market for geothermal energy are analyzed, based on a series of structured interviews with utility companies and financial institution executives. The interviews were designed to determine what information and technologies would be required before utilities would make investment decisions in favor of geothermal energy, the time frame in which the information and technologies would have to be available, and the influence of the governmental politics. The paper describes the geothermal resources, electric utility industry, its structure, the forces influencing utility companies, and their relationship to geothermal energy. A strategy for federal stimulation of utility investment in geothermal energy is suggested. Possibilities are discussed for stimulating utility investment through financial incentives, amelioration of institutional barriers, and technological improvements.

  20. Quantitative assessment of aquatic impacts of power plants

    Energy Technology Data Exchange (ETDEWEB)

    McKenzie, D.H.; Arnold, E.M.; Skalski, J.R.; Fickeisen, D.H.; Baker, K.S.

    1979-08-01

    Progress is reported in a continuing study of the design and analysis of aquatic environmental monitoring programs for assessing the impacts of nuclear power plants. Analysis of data from Calvert Cliffs, Pilgrim, and San Onofre nuclear power plants confirmed the generic applicability of the control-treatment pairing design suggested by McKenzie et al. (1977). Substantial progress was made on the simulation model evaluation task. A process notebook was compiled in which each model equation was translated into a standardized notation. Individual model testing and evaluating was started. The Aquatic Generalized Environmental Impact Simulator (AGEIS) was developed and will be tested using data from Lake Keowee, South Carolina. Further work is required to test the various models and perfect AGEIS for impact analyses at actual power plant sites. Efforts on the hydrologic modeling task resulted in a compendium of models commonly applied to nuclear power plants and the application of two well-received hydrodynamic models to data from the Surry Nuclear Power Plant in Virginia. Conclusions from the study of these models indicate that slight inaccuracies of boundary data have little influence on mass conservation and accurate bathymetry data are necessary for conservation of mass through the model calculations. The hydrologic modeling task provides valuable reference information for model users and monitoring program designers.

  1. Quantitative assessment of aquatic impacts of power plants

    International Nuclear Information System (INIS)

    McKenzie, D.H.; Arnold, E.M.; Skalski, J.R.; Fickeisen, D.H.; Baker, K.S.

    1979-08-01

    Progress is reported in a continuing study of the design and analysis of aquatic environmental monitoring programs for assessing the impacts of nuclear power plants. Analysis of data from Calvert Cliffs, Pilgrim, and San Onofre nuclear power plants confirmed the generic applicability of the control-treatment pairing design suggested by McKenzie et al. (1977). Substantial progress was made on the simulation model evaluation task. A process notebook was compiled in which each model equation was translated into a standardized notation. Individual model testing and evaluating was started. The Aquatic Generalized Environmental Impact Simulator (AGEIS) was developed and will be tested using data from Lake Keowee, South Carolina. Further work is required to test the various models and perfect AGEIS for impact analyses at actual power plant sites. Efforts on the hydrologic modeling task resulted in a compendium of models commonly applied to nuclear power plants and the application of two well-received hydrodynamic models to data from the Surry Nuclear Power Plant in Virginia. Conclusions from the study of these models indicate that slight inaccuracies of boundary data have little influence on mass conservation and accurate bathymetry data are necessary for conservation of mass through the model calculations. The hydrologic modeling task provides valuable reference information for model users and monitoring program designers

  2. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  3. Interaction in the large energetic companies in the Republic of Macedonia

    International Nuclear Information System (INIS)

    Janevski, Risto

    1999-01-01

    After disintegration of former power energetic system of Yugoslavia 1991, the Republic of Macedonia has faced enormous problems in the energetic field. It was necessary to realize all options in order to secure enough electric power for normal economic capacities function. In that course a direct involvement of five large companies, which represent very significant energetic subjects, will largely determine the future energetic conditions and circumstances in our country. These are the following companies: P.E. Electric Power Company Of Macedonia; OKTA Crude Oil Refinery; Heat Power Company; HEK Jugohrom; Fenimak. The paper presents the electric power consumption of these macro energetic companies during the period 1991-1998

  4. 77 FR 7142 - Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Availability of Environmental...

    Science.gov (United States)

    2012-02-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2309-019] Jersey Central Power and Light Company, PSEG Fossil, LLC; Notice of Availability of Environmental Assessment In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's...

  5. The French Electricity Company (EDF) and GEC ALSTHOM have signed the agreement for Chinese Laibin B electric power plant

    International Nuclear Information System (INIS)

    1997-01-01

    EDF and GEC ALSTHOM together with the government of Chinese Province Guangxi have organized in Pekin on 3 september 1997 a ceremony for signing a BOOT (Build, Own, Operate, Transfer) contract for the Coal Power Plant (2 x 360 MW) at Laibin B. This is the first Chinese BOOT contract in the power domain entirely financed by foreign capital. The two western companies which were retained for this project, following an international call for offers, invest USD 150 million of its own founds in this USD 600 million project. They will hold 60% and 40% of the capital of the company created for this project, respectively. The construction power plant is planned to be completed at the end of 1999 - beginning of 2000. After 15 years of industrial operation the power plant will be transferred to the autonomous government of the Province Guangxi. The communique contains the following 8 files: 1. The Laibin B power plant; 2. Build, Own, Operate, Transfer; 3. The autonomous Guangxi Province; 4. An outline of EDF in China; 5. Profile/activities of GEC ALSTHOM in China; 6. The 'Credit Agricole Indosuez' in China; 7. BZW Barclays PLC; 8. HSBC Investment Banking in China

  6. Modification of reactor installation in the Takahama nuclear power plants No.1 and No.2 of Kansai Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    The Nuclear Safety Commission recognized the adequacy concerning the inquiry which was offered from the Minister of International Trade and Industry on July 24, 1979, following the safety evaluation in the Ministry of International Trade and Industry, and decided to submit a report to the Minister of International Trade and Industry on July 26, 1979, about the modification of reactor installation in the Takahama nuclear power plants No. 1 and No. 2 of the Kansai Electric Power Company, Inc. This is concerned to the application which was made from the president of the Kansai Electric Power Company, Inc., to the Minister of International Trade and Industry on July 23, 1979. The content of the modification is to add a control circuit which is actuated by the signal of abnormal low pressure in a reactor to the circuit of actuating the emergency core cooling system of the plant. The influences on the safety protection system by the addition of the circuit for transmitting safety injection signal and by the additions of an interlock circuit preventing the misoperation of pressurizer spray and of a block circuit of safety injection signal in case of the abnormal low pressure in a reactor were evaluated. The effects on the function and characteristics of the emergency core cooling system due to the addition of the control circuit were investigated, and it was recognized by the analysis that there is no effect in the pipe ruptures of both small and large scales. (Nakai, Y.)

  7. Conformance to Generic Letter 83-28, Items 3.1.3 and 3.2.3, Beaver Valley, Unit No. 1, North Anna, Unit Nos. 1 and 2, Surry Unit Nos. 1 and 2 (Docket Nos. 50-334, 50-338, 50-339, 50-280, and 50-281)

    International Nuclear Information System (INIS)

    Haroldsen, R.

    1985-09-01

    This report provides a review of the submittals for Beaver Valley, Unit No. 1, North Anna, Unit Nos. 1 and 2, and Surry, Unit Nos. 1 and 2, for conformance to Generic Letter 83-28, Items 3.1.3 and 3.2.3. The specific plants selected were reviewed as a group because of similarity in type and applicability of review items

  8. Spent-fuel management strategies at Carolina Power ampersand Light Company

    International Nuclear Information System (INIS)

    Thompson, M.F. Jr.; Kunita, R.K.

    1990-01-01

    Carolina Power ampersand Light (CP ampersand L) Company serves customers in portions of both North and South Carolina, and operates the Robinson 2, Brunswick 1 and 2, and Harris nuclear units. Due first to licensing delays in the Allied General Nuclear Service reprocessing plant and then to actions and inactions by the federal government, CP ampersand L like other utilities, is concerned with the storage of spent fuel. Despite pool reracking to the maximum practical, further actions have been necessary; hence, CP ampersand L undertook efforts to make both dry storage and transshipment viable alternatives. Based on experience, it is found that while both dry storage and transshipment are viable options, transshipment is the better strategy for CP ampersand L. Dry storage will be maintained as an alternative strategy

  9. 78 FR 9907 - TGP Development Company, LLC; TGP Flying Cloud Holdings, LLC; WEC TX Company, LLC v. Arizona...

    Science.gov (United States)

    2013-02-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL13-45-000] TGP Development Company, LLC; TGP Flying Cloud Holdings, LLC; WEC TX Company, LLC v. Arizona Public Service Company... section 206 of the Federal Power Act, 16 U.S.C. 824(e) (2006), TGP Development Company, LLC, TGP Flying...

  10. Emergency response facility technical data system of Taiwan Power Company

    International Nuclear Information System (INIS)

    Lin, E.; Liang, T.M.

    1987-01-01

    Taiwan Power Company (Taipower) has developed its emergency response facility program since 1981. This program is integrated with the following activities to enhance the emergency response capability of nuclear power plants: (1) survey of the plant instrumentation based on the requirements of R.G. 1.97; (2) improvement of plant specific emergency operating procedures based on the emergency response guidelines developed by the Owners group; (3) implementation of the detailed control room design review with the consideration of human engineering and task analysis; and (4) organization, staff and communication of emergency planning of nuclear power plant. The emergency response facility programs of Taipower are implemented in Chinshan (GE BWR4/MARK I), Kuosheng (GE BWR6/MARK III) and Maanshan (W PWR). The major items included in each program are: (1) to establish new buildings for On-Site Technical Support Center, Near-Site Emergency Operation Facility; (2) to establish an Emergency Executive Center at Taipower headquarters; (3) to establish the communication network between control room and emergency response facilities; and (4) to install a dedicated Emergency Response Facility Technical Data System (ERFTDS) for each plant. The ERFTDS provides the functions of data acquisition, data processing, data storage and display in meeting with the requirements of NUREG 0696. The ERFTDS is designed with plant specific requirements. These specific requirements are expected to be useful not only for the emergency condition but also for normal operation conditions

  11. Interim report on the accident at Fukushima Nuclear Power Stations of Tokyo Electric Power Company

    International Nuclear Information System (INIS)

    2011-12-01

    The Investigation Committee on the Accident at the Fukushima Nuclear Power Stations (the Investigation Committee) of Tokyo Electric Power Company (TEPCO) was established by the Cabinet decision on May 24, 2011. Its objectives are: to conduct investigation for finding out the causes of accidents at the Fukushima Dai-ichi Nuclear Power Station (Fukushima Dai-ichi NPS) and Fukushima Dai-ni Nuclear Power Station (Fukushima Dai-ni NPS) of TEPCO as well as the causes of accident damage; and to make policy recommendations for limiting the expansion of damage and preventing reoccurrence of similar accidents. The Investigation Committee has conducted its investigation and evaluation since its first meeting on June 7, 2011. Its activities included: site visits to the Fukushima Dai-ichi and Dai-ni NPSs, as well as to other facilities; hearing of heads of local governments around the Fukushima Dai-ichi NPS; and hearing of people concerned through interviews mainly arranged by the Secretariat. As of December 16, 2011, the number of interviewees reached 456. The investigation and evaluation by the Investigation Committee are still ongoing and the Interim Report does not cover every item that the Committee aims at investigating and evaluating. Fact-finding of even some of those items discussed in the Interim Report are not yet completed. The Investigation Committee continues to conduct its investigation and evaluation and will issue its Final Report in the summer of 2012. This brief executive summary covers mainly considerations and evaluation of the issues in Chapter VII of the Interim Report, with brief reference to Chapters I to VI. The Investigation Committee recommendations are printed in bold. (author)

  12. Selection of highway routes for the shipment of radioactive materials within the Commonwealth of Virginia

    International Nuclear Information System (INIS)

    Hobeika, A.G.; Jamei, B.; Santoso, I.B.

    1986-01-01

    In this study Virginia Electric and Power Company proposed to ship limited quantities of irradiated nuclear fuel from Surry to North Anna in Virginia. Eight routes were considered as candidate routes for shipment. The objectives of this study are: To minimize the accidental-release radiation risk to people and property; and to maximize the community preparedness in terms of emergency response and evacuation capability. To determine the ''Preferred'' route and the alternative route for highway shipments of radioactive material, a conceptual approach was developed, based on the following three principles: Feasibility; Evaluation; and Choice. The feasibility of a candidate route is first established. Then all feasible routes are evaluated under the same criteria, which would lead to the choice of the best feasible route

  13. POSSIBILITIES OF APPLYING THE DEA METHOD IN THE ASSESSMENT OF EFFICIENCY OF COMPANIES IN THE ELECTRIC POWER INDUSTRY: REVIEW OF WIND ENERGY COMPANIES

    Directory of Open Access Journals (Sweden)

    Dario Maradin

    2014-07-01

    Full Text Available One of the fundamental tasks of modern power system is finding ways to produce stable and continuous electricity from scarce energy resources. One of the possible solutions is introduction, implementation and improvement of alternative forms of energy such as renewable energy sources, particularly wind energy as an increasingly important energy source which is expected to further increase its share in total electricity production. Numerous methods can be used in assessing the efficiency of wind energy companies, and in the focus of this research is the Data Envelopment Analysis method (DEA, a widely accepted methodology given its interdisciplinary approach and flexibility. This method represents a step forward in the field of renewable energy management, because it provides the possibility to compare the selected companies with the best in the industry (the most efficient and the possibility of determining sources of inefficiency and, consequently, the possibilities of their elimination.

  14. Erosion/corrosion-induced pipe wall thinning in US Nuclear Power Plants

    International Nuclear Information System (INIS)

    Wu, P.C.

    1989-04-01

    Erosion/corrosion in single-phase piping systems was not clearly recognized as a potential safety issue before the pipe rupture incident at the Surry Power Station in December 1986. This incident reminded the nuclear industry and the regulators that neither the US Nuclear Regulatory Commission (NRC) nor Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code require utilities to monitor erosion/corrosion in the secondary systems of nuclear power plants. This report provides a brief review of the erosion/corrosion phenomenon and its major occurrence in nuclear power plants. In addition, efforts by the NRC, the industry, and the ASME Section XI Committee to address this issue are described. Finally, results of the survey and plant audits conducted by the NRC to assess the extent of erosion/corrosion-induced piping degradation and the status of program implementation regarding erosion/corrosion monitoring are discussed. This report will support a staff recommendation for an additional regulatory requirement concerning erosion/corrosion monitoring. 21 refs., 3 tabs

  15. Guide to UK renewable energy companies 2001. 6. ed.

    International Nuclear Information System (INIS)

    2001-01-01

    This 2001 edition of the guide to UK renewable companies and equipment and service providers presents summaries of the different industry sectors covering wind power, photovoltaics, solar water heating, geothermal heat pump, hydroelectric power, marine current and wave technology, bioenergy, power generation from landfill gas, energy from waste, and cogeneration. A UK company classification listing and index is provided along with listing of UK organisations and companies and an index of advertisers

  16. Less power plants

    International Nuclear Information System (INIS)

    TASR

    2003-01-01

    In the Slovak Republic the number of company power plants decreased as against 2001 by two sources. In present time only 35 companies have their own power plants. The companies Slovnaft, Kappa Sturovo, Slovensky hodvab Senica, Matador Puchov, Maytex Liptovsky MikuIas, Kovohuty Krompachy, Chemko Strazske and some Slovak sugar factories belong to the largest company power plants in force of distributing companies. Installed output of present 35 company sources is 531 MW. The largest of separate power plants as Paroplynovy cyklus Bratislava (218 MW) and VD Zilina (72 MW) belong to independent sources. Total installed output of Slovak sources was 8306 MW in the end of last year

  17. Data logger system of Tokai (I) Nuclear Power Station, the Japan Atomic Power Company

    International Nuclear Information System (INIS)

    Machida, Akira; Chikahata, Kiyomitsu; Nakamura, Mamoru; Nanbu, Taketoshi; Kawakami, Hiroshi

    1977-01-01

    The Tokai(I) nuclear power station, the Japan Atomic Power Company, was commissioned in July, 1966. In this station, temperatures of about 700 points are monitored and recorded with a data logger. However, the logger was manufactured some 15 years ago, therefore it is now old-fashioned, and has caused frequent failures these 2 or 3 years. So it was decided to replace it with a new one, and the process control computer, U-300 system including CRT display, has been adopted considering the latest trend in U.K. The control and monitoring system in this station is not a centralized control system, but a distributed control system divided into three control rooms, namely main control room, turbine generator control room and fuel exchanger (cask machine) control room. Therefore for grasping the complete plant conditions at the main control room, the system has not been convenient, and the centralization of data processing has been desired from the viewpoint of operation. The new logger system is composed so as to facilitate the centralized monitoring in the main control room, considering the above requirement. It has been improved so as to have seven important functions in addition to the existing functions. Hardware and software of this system are briefly explained. The new system was started up in February 1977, and is now operating well, though some early failures were experienced. (Wakatsuki, Y.)

  18. Value of solar thermal and photovoltaic power plants to Arizona Public Service Company

    International Nuclear Information System (INIS)

    Smith, P.A.

    1994-01-01

    Arizona Public Service Company has performed a study using historical solar radiation and system load data to (1) estimate the effects of six types of solar generation on system reliability, (2) estimate the central station value of each to its system, (3) and to assess the potential of each of those technologies to provide bulk power to its system in the 2000 time frame. Technologies included three solar thermal (central receiver, dish Stirling, and parabolic trough) and three flat plate photovoltaic plants (fixed position, one axis, and two axis tracking)

  19. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  20. Sale of electric energy: the case of Electric Power Company of Santa Catarina State (CELESC)

    International Nuclear Information System (INIS)

    Aurich, D.S.

    1990-01-01

    An electric power system assuring the electric supply to the investor client was developed by CELESC, linking the sale resources to one generation construction. It was related the cost of enlargement work from Pery plant, with the participation of Manville Forest Products in the investments. The economic aspects of this contract are presented, including the supply assure, the costs and the advantage each company will receive. (C.G.C.)

  1. 78 FR 58571 - Maine Yankee Atomic Power Company, Connecticut Yankee Atomic Power Company, and The Yankee Atomic...

    Science.gov (United States)

    2013-09-24

    ... Yankee Companies'') from the foreign ownership, control, or domination (FOCD) requirements. ADDRESSES... law, will not present an undue risk to the public health and safety, and are consistent with the... Presents no Undue Risk to Public Health and Safety The staff finds the requirements of 10 CFR 50.38 are...

  2. 75 FR 44292 - Northern States Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2; Notice of...

    Science.gov (United States)

    2010-07-28

    ... and DPR-60] Northern States Power Company; Prairie Island Nuclear Generating Plant, Units 1 and 2... assessment, and behavioral observation) of the unescorted access authorization program when making the... under consideration to determine whether it met the criteria established in NRC Management Directive (MD...

  3. The state of improvement of security management setup in the Japan Atomic Power Company and improvement of facilities in its Tsuruga Nuclear Power Station

    International Nuclear Information System (INIS)

    1982-01-01

    In connection with the series of accidents in the Tsuruga Nuclear Power Station of the Japan Atomic Power Company, the state of security management in JAPC and the safety of facilities in the Tsuruga Nuclear Power Station, which have resulted from improvement efforts, are described on the following items: security management setup - communication and reporting in emergency, the management of inspection and maintenance records, work control and supervision in repair, improvement, etc., functional authority and responsibility in maintenance management, operation management, radiation control, personnel education; improvement of facilities - feed water heaters, laundry waste-water filter room, radioactive waste treatment facility, general drainage, concentrated waste liquid storage tanks in newly-built waste treatment building, etc. (Mori, K.)

  4. Ownership structure and market power in the nordic power market

    International Nuclear Information System (INIS)

    Amundsen, E.S.; Bergman, L.

    1999-01-01

    The opening of Nord Pool in 1996 seriously constrained the power companies' ability to exercise market power within their national borders. Currently there is an integration process going on among the power companies in the Nord Pool area. It manifest itself in terms of take-over and reciprocal acquisition of shares in the power companies - nationally and abroad. This process may undo what the introduction of the common power market achieved in curtailing market power. The aim of this paper is to investigate the effects on market power of increased cross- ownership in the Nordic power market. (au)

  5. Coomunication Culture in a company

    Directory of Open Access Journals (Sweden)

    M V Korotitskaya

    2008-03-01

    Full Text Available The article substantiates the interconnections between the level of communicative culture in a company and the level of management, which shows the investment and financial attractiveness of the enterprise. The article reveals principles and methods of sociocommunicative technology, whose application positively affects the state of communicative culture of within a company. Application examples of these principles and methods in management of power grid companies in the Belgorod region are also given.

  6. Westinghouse Electric Company experiences in chemistry on-line monitoring in Eastern European nuclear power plants

    International Nuclear Information System (INIS)

    Balavage, J.

    2001-01-01

    Westinghouse Electric Company has provided a number of Chemistry On-Line Monitoring (OLM) Systems to Nuclear Power Plants in Eastern Europe. Eleven systems were provided to the Temelin Nuclear Power Plant in the south of the Czech Republic. Four systems were provided to the Russian NPP at Novovoronezh. In addition, a system design was developed for primary side chemistry monitoring for units 5 and 6 of another eastern European VVER. The status of the Temelin OLM systems is discussed including updates to the Temelin designs, and the other Eastern European installations and designs are also described briefly. Some of the problems encountered and lessons learned from these projects are also discussed. (R.P.)

  7. Kemeny commission report. Comments by NPC (Nuclear Power Company)

    Energy Technology Data Exchange (ETDEWEB)

    1979-01-01

    Following the accident at Three Mile island in March 1979 the Nuclear Power Company (NPC) has made evaluations of the available information and carried out preliminary investigations of the implications of the accident for all UK AGR's and for the PWR design. The results are summarized. Recommendations of the President's Commission are discussed with especial reference to those under the following headings: (1) The utility and its suppliers. (2) Training of operating personnel. (3) Technical assessment. It is concluded that while many of the relevant recommendations in the report of the President's Commission are already satisfied by UK practices for nuclear safety, and are being applied by NPC in their current programmes of work on AGR's and PWR's it is realised that it is of the utmost importance that complacent attitudes to safety are not allowed to develop. The accident at TMI and report of the Commision have provided a sharp reminder of the necessity to maintain unremitting vigilance in all aspects of design, construction and operation which are involved with the safety of the public and operators.

  8. Human engineering considerations in the design of New Virginia Power Radwaste facilities

    International Nuclear Information System (INIS)

    Bankley, A.V.; Morris, L.L.; Lippard, D.W.

    1988-01-01

    Human engineering principles were considered by Virginia Power in the recent design of new radwaste facilities (NRFs) for both the Surry and North Anna power stations. Virginia Power recognized that the rigorous application of human engineering principles to the NRF design was essential to the ultimate success or failure of the facilities. Success of the NRF should not only be measured in the volume of radwaste processed but also by other factors such as (a) availability and maintainability of preferred equipment, (b) as-low-as-reasonably-achievable considerations, (c) actual release rates versus achievable release rates, and (d) flexibility to deal with varying circumstances. Each of these success criteria would suffer as the result of operator/human inefficiencies or error. Therefore, human engineering should be applied to the maximum practical extent to minimize such inefficiencies or errors. No method is ever going to ensure a perfectly human-engineered facility design. Virginia Power believes, however, that significant strides have been made in efforts to design and construct a successful radwaste processing facility, a facility where operating success rests with the ability of the human operators to perform their jobs in an efficient and reliable fashion

  9. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

    International Nuclear Information System (INIS)

    Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L.; Forester, J.; Johnson, J.

    1995-03-01

    Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively

  10. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Evaluation of severe accident risks for plant operational state 5 during a refueling outage. Main report and appendices, Volume 6, Part 1

    Energy Technology Data Exchange (ETDEWEB)

    Brown, T.D.; Kmetyk, L.N.; Whitehead, D.; Miller, L. [Sandia National Labs., Albuquerque, NM (United States); Forester, J. [Science Applications International Corp., Albuquerque, NM (United States); Johnson, J. [GRAM, Inc., Albuquerque, NM (United States)

    1995-03-01

    Traditionally, probabilistic risk assessments (PRAS) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Recent studies and operational experience have, however, implied that accidents during low power and shutdown could be significant contributors to risk. In response to this concern, in 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The program consists of two parallel projects being performed by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). The program objectives include assessing the risks of severe accidents initiated during plant operational states other than full power operation and comparing the estimated risks with the risk associated with accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program is that of a Level-3 PRA. The subject of this report is the PRA of the Grand Gulf Nuclear Station, Unit 1. The Grand Gulf plant utilizes a 3833 MWt BUR-6 boiling water reactor housed in a Mark III containment. The Grand Gulf plant is located near Port Gibson, Mississippi. The regime of shutdown analyzed in this study was plant operational state (POS) 5 during a refueling outage, which is approximately Cold Shutdown as defined by Grand Gulf Technical Specifications. The entire PRA of POS 5 is documented in a multi-volume NUREG report (NUREG/CR-6143). The internal events accident sequence analysis (Level 1) is documented in Volume 2. The Level 1 internal fire and internal flood analyses are documented in Vols 3 and 4, respectively.

  11. Analysis and application of advanced fuel management strategies at Florida Power and Light Company

    International Nuclear Information System (INIS)

    Knuckles, E.R.; Mantyh, J.D.; Hoskins, K.C.

    1986-01-01

    Reload design flexibility is the degree of freedom that the fuel management engineer has in utilizing various options to achieve and maintain an optimal core design. The major factors affecting flexibility are the basic design constraints, fuel design, and operational and regulatory uncertainty. The degree of flexibility available to the engineer can be improved through an understanding of the inter-relationship of these factors. Specific examples are used to demonstrate how the concept of flexibility has been implemented at Florida Power and Light Company

  12. Scottish Nuclear, the company

    International Nuclear Information System (INIS)

    Yeomans, R.M.

    1991-01-01

    A former chief executive of Scottish Nuclear, formed when United Kingdom electricity generation was privatized, describes the financial viability of the company and considers the future of nuclear power. Scottish Nuclear owns and operates the Advanced Gas Cooled (AGR) and Magnox reactors at Hunterston and the AGR reactor at Torness and is a separate company from those dealing with hydro-electric and non-nuclear generation of electricity. Costs of running the reactors is identified as a proportion of the whole for certain key issues such as station costs, depreciation, decommissioning and insurance. While nuclear power generation using outmoded Magnox reactors is costly, the ecological cost of global warming is seen as more of a problem. Future policy for nuclear power in Scotland must include new plant, probably pressurized water reactors and a clear policy of safety enhancement. (UK)

  13. Marketing strategic choice for wind power technology in China : case: Chinese domestic wind technology companies

    OpenAIRE

    Shi, Yi

    2011-01-01

    There are almost 80 wind turbine manufacturers in China. However, the supportive government policies are the fact behind the rapid growth of those case companies. In reality, there are less than 10 Chinese wind turbine manufacturers with actual production capacity. Most of them lack core technology and depend in many ways on state patronage. The current situation is worrisome. Therefore, the correct comprehension of wind power market conditions and the consequent adoption of right marketing s...

  14. The Industrial Photography and the Steel Company Archive of Puerto de Sagunto: Representation, Power and Identity (1944-1976

    Directory of Open Access Journals (Sweden)

    Esteban Torres

    2015-01-01

    Full Text Available This article makes a contribution on photo - documentary archives in the steel industry as a source of knowledge and sociological tool. It deals with the case of documentary photo archive Altos Hornos de Vizcaya and Altos Hornos del Mediterráneo in Sagunto (Puerto between 1944 and 1976. The article discusses the need to analyze the role of company photographers and his role as "rapporteurs" of labor and social discourse of the company. We analyze the photographic archive as "artifact of power" with a narrative structure and autonomous with functionality within the industrial process related to the generation of a structure of symbolic and identity discourses.

  15. Memorial 1997 - ENDESA (Chilean Electricity Company)

    International Nuclear Information System (INIS)

    1998-01-01

    This report provides a comprehensive survey, in depth assessment of the activities overview of ENDESA, Chilean Electricity Company, highlighting economical information and including historical and technical aspects. Economics is its focal point, but other relevant data are shown, like technical data on hydroelectric and thermoelectric power plants. Main activities developed by ENDESA are described, such in Chile as in the foreign. Data on power generation, transmission and transport are also presented and an economical balance of each colligated company are done and analysed

  16. 18 CFR 367.14 - Transactions with associate companies.

    Science.gov (United States)

    2010-04-01

    ... all transactions with associate companies. The statements may be required to show the general nature... associate companies. 367.14 Section 367.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005...

  17. Spent fuel metal storage cask performance testing and future spent fuel concrete module performance testing

    International Nuclear Information System (INIS)

    McKinnon, M.A.; Creer, J.M.

    1988-10-01

    REA-2023 Gesellshaft fur Nuklear Service (GNS) CASTOR-V/21, Transnuclear TN-24P, and Westinghouse MC-10 metal storage casks, have been performance tested under the guidance of the Pacific Northwest Laboratory to determine their thermal and shielding performance. The REA-2023 cask was tested under Department of Energy (DOE) sponsorship at General Electric's facilities in Morris, Illinois, using BWR spent fuel from the Cooper Reactor. The other three casks were tested under a cooperative agreement between Virginia Power Company and DOE at the Idaho National Engineering Laboratory (INEL) by EGandG Idaho, Inc., using intact spent PWR fuel from the Surry reactors. The Electric Power Research Institute (EPRI) made contributions to both programs. A summary of the various cask designs and the results of the performance tests is presented. The cask designs include: solid and liquid neutron shields; lead, steel, and nodular cast iron gamma shields; stainless steel, aluminum, and copper baskets; and borated materials for criticality control. 4 refs., 8 figs., 6 tabs

  18. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments

  19. Piercing of corporate veil of nuclear companies

    International Nuclear Information System (INIS)

    Frenz, Walter

    2015-01-01

    The Federal Ministry of Economics plans that the nuclear companies with all their assets to cover disposal costs can be used where a power plant operator is governed by its parent company, hence the latter Capital or voting majority of the operators holding or these passes; To date, the parent company is liable only limited and not more than five years after the end of the domination of one Subsidiary, oparating a power plant. In this way, prevents ultimately the public sector and thus the Taxpayers have to pay for the long-term consequences of the use of nuclear energy. Until now ensured paragraph 303 AktG a group law Secondary liability the parent companies of the operating company in the case of of termination of the control and profit transfer agreements is very limited for the nuclear liabilities, namely in two ways: The claim is only focused on the backup performance and not at the expense of acquisition and Moreover, according to the case law limited of five years after its foundation; for the area of transformation law comparable rules are valid. thereby the dismantling of a nuclear power station takes just already for 20 years and a final repository is expected before 2050 not be available. [de

  20. 75 FR 75704 - Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of...

    Science.gov (United States)

    2010-12-06

    ... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-275-LR; 50-323-LR] Pacific Gas and Electric Company (Diablo Canyon Nuclear Power Plant, Units 1 And 2); Notice of Appointment of Adjudicatory Employee... Seismologist, Office of Nuclear Material Safety and Safeguards, has been appointed as a Commission adjudicatory...

  1. Activities of the EMAG Mine Automation Company in development of control systems for powered supports

    Energy Technology Data Exchange (ETDEWEB)

    Sikora, W; Sobczyk, J

    1986-10-01

    Research programs are evaluated of the EMAG Mine Automation Company on electrohydraulic control systems and remote control for powered supports manufactured in Poland. A control system for the FAZOS-12/28-Oz and FAZOS-15/31-Oz supports is characterized by: reduced length of hydraulic pipes (by 1/3), increased reliability, increased number of commands, less complicated design and lower maintenance and repair cost. A scheme of the system and its main elements (electrohydraulic executive units, control panels and their position, power supply system, and electric cables) is given. After operational tests in the Murcki mine, EMAG will start manufacturing the systems on a commercial scale (about 35 units per year). The research program for development of a remote control system for the 1990s is characterized (computerized control, microprocessors complementary MOS units, etc.).

  2. Competency-orientated brand cooperations of power supply companies in the B2B sector; Kompetenzorientierte Markenkooperationen von Energieversorgungsunternehmen im B2B-Kundenbereich

    Energy Technology Data Exchange (ETDEWEB)

    Peuser, M.M.

    2008-07-01

    On the basis of an extensive empirical study with B2B electricity users, the author of the book under consideration examines brand co-operations of power supply companies with companies not working in the area of energy production. Based on the view of various co-operation alternatives, impact relations and success-determining factors of influence in the area of B2B customers are identified. The term of the authority of an energy brand is discussed. Beside this, profiles of concrete brands of current power supply companies from the view of B2B customers are pointed out, and recommendations for the organization of brand co-operation and the structure of mark authority in practice are shown. This contribution is written for lecturers and students of the management economics with the emphasis of marketing and management as well as high-level personnel in the energy industry, who wants to develop strong mark authority by brand co-operation.

  3. Nuclear utility structure. Use of nuclear service companies

    International Nuclear Information System (INIS)

    Ring, L.E.

    1980-01-01

    The feasibility of utilities incorporating service companies to construct and maintain nuclear power plants is analyzed. Responsibilities of the service companies and the public opinion of the concept are discussed

  4. Preparing Canada's power systems for transition to the year 2000: the Y2K programs of Canada's electric utility companies: province-by-province report

    Energy Technology Data Exchange (ETDEWEB)

    Anon.

    1999-09-01

    The province-by-province report covers BC Hydro; TransAlta, ATCO Ltd., EPCOR, and Enmax, SaskPower, Manitoba Hydro, Winnipeg Hydro, Ontario Power Generation, Ontario Hydro Services Company, Toronto Hydro, Hydro-Quebec and Energie Maclaren, Newfoundland and Labrador Hydro, Newfoundland Power, Nova Scotia Power, Maritime Electric,Yukon and Northwest Territories,Yukon Electrical Company Ltd., Northland Utilities (Yellowknife) Ltd. and Northland Utilities (NWT) Ltd. A report typically deals with inventory, testing and remediation of business systems, inventory, testing and remediation of operational control devices, business partner reviews, and preparation and exercising of contingency plans, as well as Y2K status and readiness reports, and dateline preparations.

  5. 18 CFR 367.30 - Cost accumulation system for associate companies.

    Science.gov (United States)

    2010-04-01

    ... to the types of services performed and chargeable to the associate companies served. Service company... system for associate companies. 367.30 Section 367.30 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY...

  6. 18 CFR 367.58 - Property record system required for service company property.

    Science.gov (United States)

    2010-04-01

    ... to show the nature of each addition to or retirement of service company property, the related total... required for service company property. 367.58 Section 367.58 Conservation of Power and Water Resources... COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED...

  7. The social and economic impact created by construction of a nuclear power station: the part played by local companies

    International Nuclear Information System (INIS)

    Rongere, H.

    1983-01-01

    The president of the Sedan Chamber of Commerce and Industry and managing director of a public works company indicates how local and regional firms involved in the construction of the Chooz B power plant in the Ardennes organized themselves to cater for the requirements of the EDF. The measures taken by these firms to adapt themselves to the demanding and complex nuclear power market are indicated and further the repercussions of the on site work on employment levels and business activity are indicated [fr

  8. Determination of compliance with PL 92-500 Section 316(b) for the Donald C. Cook Nuclear Power Plant of the Indiana and Michigan Power Company

    International Nuclear Information System (INIS)

    Sharma, R.K.; Freeman, R.F. III.

    1980-04-01

    Region III of the US Fish and Wildlife Service contracted with the Division of Environmental Impact Studies, Argonne National Laboratory, to make the 316(b) determination for the Donald C. Cook Nuclear Power Plant of the Indiana and Michigan Power Company and to make recommendations for improvement in intake design to facilitate compliance. To conduct this assessment, appropriate literature on screening systems and reports furnished by the applicant on intake design and operation and on ecological studies at the site were reviewed. Modifications of the location and design of the existing intake and possibilities of retrofitting with fine-mesh screening to screen larval forms of fishes were examined. It was determined that currently there is no dictated need for fine-mesh screening of intake flow at the D.C. Cook Nuclear Power Plant

  9. Financing the electric power utilities, especially the nuclear power in Japan

    International Nuclear Information System (INIS)

    Tajima, T.

    1975-04-01

    Electric power demands in Japan have shown a remarkable growth at an annual rate of 12% since 1965. Nine electric power companies have invested large amounts of money so far, amounting to over 1 trillion yen every year since 1972. A survey of the electric power supply system and an estimation of the electric power demands in 1980 and in 1985 are given. It is expected that the main portion of electric power in the future will gradually be generated by nuclear plants. Financial features of the electrical power utilities, the credit risk of the electric power utilities, and the raising of funds by electric power utilities are discussed. It is concluded that it will be necessary (1) to expand the capital market, (2) to enable the electric power companies to issue a sufficient amount of bonds, (3) to make the Government financing institutions, such as the Japan Development Bank, provide the electric power companies with larger funds on a long-term and low-interest rate basis, and (4) even to take such drastic steps as subsidizing interest on private loans to the electric power companies. (B.P.)

  10. 76 FR 20459 - Savings and Loan Holding Company Application

    Science.gov (United States)

    2011-04-12

    ... DEPARTMENT OF THE TREASURY Office of Thrift Supervision Savings and Loan Holding Company... concerning the following information collection. Title of Proposal: Savings and Loan Holding Company... officer of a savings and loan holding company, or any individual who owns, controls, or holds with power...

  11. MULTINATIONAL COMPANIES AND THEIR ATITUDE TOWARDS UNION ACTIVITY

    OpenAIRE

    Maria Cristina BÃLÃNEASA

    2013-01-01

    The intensification of the global economic activity has generated changes in working relations. The intensification of the activities within multinational companies has determined greater employment flexibility, but also a lower collective bargaining power of the employees, because the multinationals attempted to weaken the power of trade unions. The purpose of this paper is precisely to identify the attitude of these companies towards trade union activity and the reaction of labour organizat...

  12. Forecasted electric power demands for the Baltimore Gas and Electric Company. Volume 1 and Volume 2. Documentation manual

    International Nuclear Information System (INIS)

    Estomin, S.L.; Beach, J.E.; Goldsmith, J.V.

    1991-05-01

    The two-volume report presents the results of an econometric forecast of peak load and electric power demand for the Baltimore Gas and Electric Company (BG ampersand E) through the year 2009. Separate energy sales models were estimated for residential sales in Baltimore City, residential sales in the BG ampersand E service area excluding Baltimore City, commercial sales, industrial sales, streetlighting sales, and Company use plus losses. Econometric equations were also estimated for electric space heating and air conditioning saturation in Baltimore City and in the remainder of the BG ampersand E service territory. In addition to the energy sales models and the electric space conditioning saturation models, econometric models of summer and winter peak demand on the BG ampersand E system were estimated

  13. Do we really have a say? Facebook and the concept of power : A study on how companies perceive their influence on Facebook.

    OpenAIRE

    Vilja, Piia

    2015-01-01

    Social networking sites such as Facebook are a very integrated part of people’s lives and that means that Facebook has also become a huge advertising machine. Companies use Facebook for branding, advertising and as a customer service channel. We have seen protests on Facebook against authoritarian regimes and that is why this thesis is interested to study who holds power and has influence over others on Facebook. As Facebook has become a marketing machine this thesis focuses on company percep...

  14. The German risk study for nuclear power plants

    International Nuclear Information System (INIS)

    Birkhofer, A.

    1980-01-01

    In August 1979 results of the ''German Risk Study for Nuclear Power Plants'' were published. The Main Report, in which approach and results of the study are documented, has been available since the end of 1979. It was the charter of the study - which was performed on behalf of the Minister of Research and Technology of the Federal Republic of Germany - to apply as far as possible the methods of the US Reactor Safety Study (WASH-1400) to German plant and site conditions. A direct transfer of the results was not deemed justified, mainly for the following reasons: There is quite a number of differences between the design of the reference plants of WASH-1400 (Surry-1, Peach Bottom-2) and German nuclear power plants. The mean population density in the Federal Republic of Germany is more than ten times of the United States. In the vicinity of nuclear power plants the ratio is about 3:1. To calculate the collective risk resulting from reactor accidents, a total of 25 plants at 19 different sites in the Federal Republic of Germany were considered. This included all plants with 600 MW or more electrical output, which were in operation, under construction or in licensing process by July 1, 1977. As an approximation to the real situation, it has been assumed that all 25 plants are technically identical to the reference plant

  15. Fuel cells and electricity companies - new risk management opportunities

    International Nuclear Information System (INIS)

    Whale, M.

    2004-01-01

    'Full text:' Deregulation, distributed generation, combined heat and power, renewables, fuel cells, hydrogen. Power companies are facing a rapidly evolving environment that is testing their ability to effectively deploy capital and earn profits. While recent deregulation trends have shifted the structure of power markets into separating generators from distributors, the improving economic value proposition offered by smaller scale distributed generation technologies - such as fuel cells - would seem to be a conflicting development. In this complex and changing environment, decisions based on the economic reality of the capital markets are likely to prevail. By examining the opportunity to enhance risk management offered by stationary fuel cells, particularly in CHP applications, we provide a context for the issues being discussed in today's sessions focusing on power companies and electric utilities. Our risk management perspective suggests a pathway for implementing fuel cells in combined heat and power applications that large power generators can introduce in increasingly smaller sizes. With capital costs of fuel cells high and risk tolerance of power companies low, the challenge for smaller technology developers will be to reduce the apparently long time horizon that persists for substantial deployment. (author)

  16. Inquiry relating to modification of reactor installation of Hamaoka No. 2 nuclear power plant of Chubu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modification of reactor installation of the Hamaoka No. 2 nuclear power plant, Chubu Electric Power Company, Inc., on February 8, 1979, from the president of the company. After the safety evaluation in the Ministry of International Trade and Industry was finished, inquiry was conducted to the head of the Atomic Energy Safety Commission (AESC) on May 25, 1979, from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on May 28, 1979. The modification of the reactor installation is the increase of spent fuel storage capacity from about 220% of in-core fuel at present to about 325%. The fundamental philosophy of the safety evaluation includes the following items; 1) the storage capacity of spent fuel is adequate, 2) the design is such that the criticality is prevented under any assumed condition, 3) the sufficient cooling capacity is kept for decay heat removal, 4) and others required for the safety. The contents of the safety examination for each philosophical item written above are presented. The increased spent fuel storage capacity is equivalent to the quantity produced in about eight years. The prevention of criticality in the spent fuel storage is carefully practiced by putting fuel assemblies in the stainless steel racks with large neutron absorption cross section and locating spent fuel assemblies at the proper distances. The effective multiplication factor is less than 0.95 at the most severe arrangement in the fuel pool. The water temperature in the pool is less than 65 deg C at about 325% core storage by operating the spent fuel pool water cooling system. The spent fuel storage racks are designed as the A class aseismatic structure. (Nakai, Y.)

  17. Radwaste minimization successes at Duke Power Company

    International Nuclear Information System (INIS)

    Lan, C.D.; Johnson, G.T.; Groves, D.C.; Smith, T.A.

    1996-01-01

    At Duke Power Company, open-quotes Culture Changeclose quotes is a common term that we have used to describe the incredible transformation. We are becoming a cost conscious, customer driven, highly competitive business. Nowhere has this change been more evident then in the way we process and dispose of our solid radioactive waste. With top-down management support, we have used team-based, formalized problem solving methods and have implemented many successful waste minimization programs. Through these programs, we have dramatically increased employees' awareness of the importance of waste minimization. As a result, we have been able to reduce both our burial volumes and our waste processing and disposal costs. In June, 1994, we invited EPRI to conduct assessments of our waste minimization programs at Oconee and Catawba nuclear stations. Included in the assessments were in-depth looks at contamination control, an inventory of items in the plant, the volume of waste generated in the plant and how it was processed, laundry reject data, site waste-handling operations, and plant open-quotes housekeepingclose quotes routines and process. One of the most important aspects of the assessment is the open-quotes dumpster dive,close quotes which is an evaluation of site dry active waste composition by sorting through approximately fifteen bags of radioactive waste. Finally, there was an evaluation of consumable used at each site in order to gain knowledge of items that could be standardized at all stations. With EPRI recommendations, we made several changes and standardized the items used. We have made significant progress in waste reduction. We realize, however, that we are aiming at a moving target and we still have room for improvement. As the price of processing and disposal (or storage) increases, we will continue to evaluate our waste minimization programs

  18. Modernization of Henry Borden hydroelectric power plant: The ELETROPAULO`s, The Electric Power Company of Sao Paulo State, experience in no.1 generator power improvement; Modernizacao da Usina Henry Borden (a experiencia da ELETROPAULO na repotenciacao do gerador nr. 1)

    Energy Technology Data Exchange (ETDEWEB)

    Delbone, Edval; Matos, Jose Alberto da S.; Grassi, Marco A; Oliveira, Robinson C; Sertori, Sergio R [Eletricidade de Sao Paulo SA, SP (Brazil); Duarte, F I; Pires, Nilo Ramos; Yamagushi, Luiz Massao [Asea Brown Boveri (ABB) (Brazil)

    1996-12-31

    The need for the substitution of several the generating equipment of Henry Borden hydroelectric power plant due to the end of their service life, in addition to the difficult economic situation and specific characteristics of the unit, leaded ELETROPAULO company to decide for the power improvement of some equipment. This work presents this experience giving special emphasis to the procedure adopted and results obtained 2 tabs.

  19. 75 FR 6736 - FirstEnergy Nuclear Operating Company, FirstEnergy Nuclear Generation Corp., Ohio Edison Company...

    Science.gov (United States)

    2010-02-10

    ..., Beaver Valley Power Station, Unit Nos. 1 and 2; Environmental Assessment and Finding of No Significant Impact The U.S. Nuclear Regulatory Commission (NRC) is considering issuance of an exemption, pursuant to... Operating Company (licensee), for operation of the Beaver Valley Power Station, Unit Nos. 1 and 2 (BVPS-1...

  20. The liberalization of the European energy market from the perspective of the Austrian regional power company

    International Nuclear Information System (INIS)

    Sander, H.

    1999-01-01

    This dissertation addresses the liberalization of the European energy sector from an Austrian perspective, emphasizing its effect on a regional power company (KELAG). The energy market's changing conditions are creating new opportunities for consumers that allow them to optimize their ability to fulfill their power requirements. Decentralized solutions are now just as viable for large industrial customers as the ability to have all energy supplied through the utility network. In addition, partnerships with independent power producers (IPP's) or cooperation between the large customers in energy production can be considered. From a regional perspective, the central management concept of KELAG is the answer to an altered market situation, since this concept created tremendous potential for streamlining the management of energy production and operation of the network. The liberalization of the energy market for large industrial customers in Carinthia's electricity sector was preceded by a series of important decisions. The Verbundgesellschaft combine their generating facilities. In the future the power plants of Draukraft in Carinthia will be supervised and controlled remotely from KELAG's central control unit in Klagenfurt, as a result of which the central control unit becomes the primary energy control for Carinthia. (author)

  1. Additional costs for Norwegian power companies from the OED-proposed implementation of the Electricity Directive II; Merkostnader for norske kraftselskaper ved OEDs forslag til implementering av Eldirektiv II

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2005-07-01

    The cost-related consequences for Norwegian vertically integrated power companies caused by the proposed implementation of Electricity Directive II by OED (Norwegian Oil and Energy Department) are considered. Electricity Directive II demands a company and functional division between the network activities and the activities exposed to competition. The OED proposition aims at lowering the limit for which network companies are included by the new demands, from 100.000 to either 20.000 or 10.000 network clients. Moreover, they propose measures that ensure the network companies' independence, and these exceed by far the minimum requirements of Electricity Directive II. The additional costs may be significant in some aspects. Especially the requirement of an independent management in parent- and subsidiary company will lead to added costs of about Nok 320 million for the Norwegian power business. Further, a split-up management structure may be poorly compatible with the mind set behind the corporate model, something which potentially can lead to bad investments or a weaker utilization of potential cost synergies. The motive for proposing stricter demands on Norwegian power business is among other to limit cross-subsidies so that the competition in the market is reinforced. In light of substantial, quantified additional costs and other negative effects, the proposition's effect on the competition should be investigated further, including alternative measures that may be more cost-effective and/or more accurate (ml)

  2. Application of quality assurance to a company in change

    International Nuclear Information System (INIS)

    Churchill, G.F.; Smith, C.R.

    1994-01-01

    The effect of change, particularly in the field of quality assurance, is examined for NNC, an engineering design, project management and consultancy company formed from the industrial group responsible for nuclear power station construction in the United Kingdom. The role of the company has changed over the past six years moving from being a single supplier for turnkey cost-plus nuclear power station projects to competing in the open market for contracts in diverse nuclear and non-nuclear projects. Changes in working practices needed to accommodate new business roles has been driven, in part, by the development and application of the company's quality system, described in this article. (UK)

  3. Design and construction of solidification and dewatering facility at Alabama Power Company's Farley Nuclear Plant

    International Nuclear Information System (INIS)

    Farnsworth, P.

    1988-01-01

    The approximate total cost of the structure and supporting piping systems is estimated to be 4.1 million dollars. Total dose savings per year could be as high as 70 man Rem for resin processing alone. The ability to store refueling equipment, process contaminated oils, load and unload trucks and containers regardless of weather conditions and support repair work on equipment greatly enhances the cost effectiveness of the project. It will take at least one year of operation of the facility to accurately assess the true cost savings to Alabama Power Company. The morale factor for the Waste and Decon Group has escalated measurably due to the dose reduction to our personnel. Plant and company management are well pleased due to the possibility of a spill or release to the environment has been eliminated which was on intangible cost. Facility construction has been completed as of this date and resin transfer anticipated within the next few days. Some of the problems encountered in planning and constructing this solidification and dewatering facility are presented. A safety evaluation for the facility is included in the appendix

  4. Progress of innovation of electrical power technology in FY2013

    International Nuclear Information System (INIS)

    Mayumi, Akihiko; Tanaka, Masanori; Yamaguchi, Hiroshi

    2014-01-01

    The following is the description of technical innovations at 12 companies including Tokyo Electric Power Company, Chubu Electric Power Company, and Japan Atomic Power Company. Tokyo Electric Power Company presented (1) the developments of a wet-type air decontaminating apparatus for inside/outside of power plant, (2) a robot to be used for field investigation at the Fukushima Daiichi nuclear power plant, (3) a visualization technology using laser for detection, and (4) removal of debris at the power plant. Chubu Electric Power Company presented application of a flap gate to the opening on exterior wall of building as a countermeasure against tsunami at the Hamaoka nuclear power plant. Hokuriku Electric Power Company presented a nuclear reactor operation training simulator for full-scope operation training for the Shika nuclear power station. Chugoku Electric Power Company presented their efforts in implementing a predictive monitoring system at the Shimane Nuclear Power Station. Shikoku Electric Power Company presented the installation of a weir with a flap gate to the interior of seawater pit as a countermeasure against tsunami. Japan Atomic Power Company presented an impact assessment method of fallout during transportation of materials caused by nuclear reactor accident, design and development of a square-type shielding container for radioactive wastes, a strength test on concrete materials for the safety design of Tsuruga Power Station Units 3 and 4, decommissioning of nuclear power plant, and research and development of the fast breeder reactor. (S.Y.)

  5. VUJE, Inc. Company mission

    International Nuclear Information System (INIS)

    2008-01-01

    VUJE is an engineering company that performs design, supply, implementation, research and training activities, particularly in the field of nuclear and conventional power generation. Our earlier research specialization in the field of nuclear power generation has gradually diversified into design and engineering activities during performing particular tasks. Nowadays we are able to provide all activities related to construction, operation, modernisation and finally termination of operation mainly of power generating facilities. Our objective is to offer complex, professional and quality solutions according to our customers' needs and thus assist to show real asset of nuclear energy generation. (author)

  6. Modeling the economic consequences of LWR accidents

    International Nuclear Information System (INIS)

    Burke, R.P.; Aldrich, D.C.; Rasmussen, N.C.

    1984-01-01

    Models to be used for analyses of economic risks from events which may occur during LWR plant operation are developed in this study. The models include capabilities to estimate both onsite and offsite costs of LWR events ranging from routine plant outages to severe core-melt accidents resulting in large releases of radioactive material to the environment. The models can be used by both the nuclear power industry and regulatory agencies in cost-benefit analyses for decisionmaking purposes. The newly developed economic consequence models are applied in an example to estimate the economic risks from operation of the Surry Unit 2 plant. The analyses indicate that economic risks from US LWR operation, in contrast to public health risks, are dominated by relatively high-frequency forced outage events. Even for severe (e.g., core-melt) accidents, expected offsite costs are less than expected onsite costs for the Surry site. The implications of these conclusions for nuclear power plant operation and regulation are discussed

  7. Hurricane Andrew causes major oil spill at Florida Power ampersand Light Company's Turkey Point Power Plant, Homestead, Florida

    International Nuclear Information System (INIS)

    Jones, M.A.; Butts, R.L.; Lindsay, J.R.; McCully, B.S.; Pickering, T.H.

    1993-01-01

    On August 24, 1992, Hurricane Andrew slammed into South Florida with wind gusts in excess of 160 mph. At 4:00 a.m. that day, the eye of this category four storm passed over Florida Power ampersand Light Company's Turkey Point power plant, south of Miami. Although the plant's two nuclear units escaped any significant damage, the storm caused extensive destruction to buildings and transmission facilities, and damaged two 400 foot tall emission stacks associated with the site's two fossil fuel generating units. In addition, a 90,000 to 110,000 gallon spill of No. 6 fuel oil resulted when a piece of wind-blown debris punctured the steel of the unit One 12,000 barrel fuel oil metering tank approximately 30 feet up from the tank bottom. Despite the presence of a secondary containment structure around the tank, the intense wind blew oil throughout the plant site. The damage to the metering tank apparently occurred during the first half hour of the hurricane. As the tank's oil level fell due to the puncture, transfer pumps from the bulk oil storage tanks received a low level alarm which automatically began transferring oil to the damaged metering tank. To prevent the further discharge of oil, plant personnel entered the power block and secured the pumps during the passage of the hurricane eye. Immediately following the storm, facility personnel deployed booms across the barge canal and the Units 1 and 2 intake canal to contain the oil which had entered the water. The response strategy and implementation is described in detail. The remediation costs were approximately $14/gallon spilled, including 54,000 gallons recovered for electricity generation

  8. Measures associated with the dose limitation system at the TVO Power Company

    International Nuclear Information System (INIS)

    Ruuskanen, A.T.; Sundell, R.O.

    1982-01-01

    The paper discusses radiation protection practices at the TVO Power Company, which owns and operates two BWR units of Asea-Atom design at Olkiluoto, Finland. The installed electric power of each unit is 660MW. The full power operation of TVO I and TVO II began in 1979 and 1980, respectively. The dose limitation system calls for an organization which is responsible for radiation protection. This organization at the plant site is described. To limit doses a good knowledge of the work activities which cause doses is needed. There is a very up-to-date microprocessor-based work dosimetry system at the TVO power plant. The system provides a practicable means of measuring personal doses from various work activities. It also makes the allocation of radiation protection measures possible. The system and experience in applying it are discussed. The dose limitation system presupposes the realization of the optimization principle. The practice applied at TVO in order to limit internal contamination is presented. Owing to this practice, workers' internal doses have remained at a considerably low level. The paper discusses the ALARA values of different kinds of respiratory equipment. These values, which vary from 2x10 4 to 1x10 6 FIM/man.Sv (1 FIM=approx. US$ 0.22), can be used in the evaluation of different measures in avoiding internal doses. The operating policy of movable lead shields is presented. The ALARA value of this activity is evaluated to be about 5x10 4 FIM/man.Sv and on that basis it can be concluded that the use of movable lead shields is very efficient. The dose statistics for TVO's plant are presented. The doses have been less than 0.001 man.Sv/MW.a. Although the dose statistics for TVO are very good it is not realistic to consider solely the optimization aspect of radiation protection. The costs must also be kept in mind; these are presented in the paper. Problems in assessing the level of radiation protection practices on an annual basis are briefly discussed

  9. Urban commercial promotion policies of power production-distribution companies in France during the inter-war years

    International Nuclear Information System (INIS)

    Soutenet-Martin, Laure

    2009-01-01

    The inter-war years are sandwiched between the enthusiasm of the early stages of electricity at the end of the 20. century, and this same energy becoming commonplace through the use of mass domestic electric appliance. And this is what makes this an important study period as it allows understanding the emergence of new advertisement notions for this form of energy. The companies producing and distributing power were able to join forces with the manufacturers of domestic electric appliances to promote the domestic uses of electricity. The urban environment was largely favoured for these first advertising campaigns as the first customers were found in the city. However, in the French case, general consumption remained low under the effects of a large rural world and the persistence of high rates. Finally, the different attempts made to increase electricity consumption were primarily driven by the promotion of the domestic usages of power

  10. An agent-based simulation of power generation company behavior in electricity markets under different market-clearing mechanisms

    International Nuclear Information System (INIS)

    Aliabadi, Danial Esmaeili; Kaya, Murat; Şahin, Güvenç

    2017-01-01

    Deregulated electricity markets are expected to provide affordable electricity for consumers through promoting competition. Yet, the results do not always fulfill the expectations. The regulator's market-clearing mechanism is a strategic choice that may affect the level of competition in the market. We conceive of the market-clearing mechanism as composed of two components: pricing rules and rationing policies. We investigate the strategic behavior of power generation companies under different market-clearing mechanisms using an agent-based simulation model which integrates a game-theoretical understanding of the auction mechanism in the electricity market and generation companies' learning mechanism. Results of our simulation experiments are presented using various case studies representing different market settings. The market in simulations is observed to converge to a Nash equilibrium of the stage game or to a similar state under most parameter combinations. Compared to pay-as-bid pricing, bid prices are closer to marginal costs on average under uniform pricing while GenCos' total profit is also higher. The random rationing policy of the ISO turns out to be more successful in achieving lower bid prices and lower GenCo profits. In minimizing GenCos' total profit, a combination of pay-as-bid pricing rule and random rationing policy is observed to be the most promising. - Highlights: • An agent-based simulation of generation company behavior in electricity markets is developed. • Learning dynamics of companies is modeled with an extended Q-learning algorithm. • Different market clearing mechanisms of the regulator are compared. • Convergence to Nash equilibria is analyzed under different cases. • The level of competition in the market is studied.

  11. Impact of plant transient response on fuel management strategy at Virginia Power

    International Nuclear Information System (INIS)

    Bucheit, D.M.; Smith, N.A.

    1987-01-01

    Virginia Power has been performing in-house reload core design and safety analysis for several years. These analyses have been in support of North Anna units 1 and 2 and Surry units 1 and 2, all of which are three-loop pressurized water reactor plants designed and built by Westinghouse. Historically, Virginia Power first developed the capability to design and optimize its own core loading patterns in the early 1970's. This development effort was driven by the need to establish in-house control of the fuel management process, thereby ensuring that energy generation requirements are met in an economically optimum fashion. It soon became obvious that reload design and safety analysis processes are so integrally coupled that in order to perform the fuel management function in an effective manner, in-house capability in both areas needed to be developed. After reviewing the spectrum of economic, safety and operational constraints which affect the reload design and analysis process, an integrated model of the process is presented in flow chart format. This is followed by several specific examples which illustrate the interplay between sound fuel management practice and the assurance of plant safety using in-house analysis techniques

  12. The new tariff model based on marginal costs developing concept for Brazilian electric sector. A case study for Power and Light Company of Sao Paulo State (Brazil)

    International Nuclear Information System (INIS)

    Correia, S.P.S.

    1991-01-01

    A new methodology for power generation cost accounts in Brazilian electric sector is described, with the application of marginal costs theory and its deviation in developing economies. A case report from a Brazilian Power and Light Company is studied, focalizing the seasoning, the planning, the tariff model and the power generation, transmission and distribution. (M.V.M.). 19 refs, 28 figs, 1 tab

  13. Exchange of current BPA surplus power for future power from certain companies' share of WNP-3 to settle a dispute over construction delay. Record of decision. Volume I

    International Nuclear Information System (INIS)

    1985-01-01

    This Record of Decision (ROD) sets forth the Bonneville Power Administration's (BPA) reasons for settling litigation over the delay in constructing Washington Public Power Supply System (Supply System) Nuclear Project No. 3 (WNP-3). The litigation concerns the decision in May 1983 to defer construction until financing becomes available to the Supply System and a demonstrable need for the Project is established. The construction deferral was made at the request of the Administrator of BPA, a federal power marketing agency in the Pacific Northwest. BPA is obligated to pay principal and interest on bonds sold by the Supply System to finance 70 percent of the project. The construction delay was opposed by the project's minority owners, four Northwest investor-owned utilities (companies) which collectively own 30 percent of the project

  14. NPPs Secondary Circuit Piping Wall-Thinning Management in China

    International Nuclear Information System (INIS)

    Zhong Zhimin; Li Jinsong; Zheng Hui

    2012-01-01

    Since 1980s, secondary circuit piping wall-thinning incidents happened in nuclear power plants (NPPs) worldwide. Particularly Surry 2 and Mihama 3 accidents resulted from flow-accelerated corrosion (FAC), unplanned outage, huge fatalities and economic loss pushed whole industry to pay more attention on the wall-thinning problem.

  15. Inquiry relating to modifications of reactor installation in Genkai No. 1 and 2 nuclear power plants of Kyushu Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1979-01-01

    Application was made to the Minister of International Trade and Industry for the license relating to the modifications of reactor installation in the Genkai No. 1 and 2 nuclear power plants, Kyushu Electric Power Company, Inc., on February 27, 1979, from the president of the company. After the safety evaluation was finished by the Ministry of International Trade and Industry, inquiry was conducted to the head of the Atomic Energy Safety Commission (AESC) on June 15, 1979 from the Minister of International Trade and Industry. The investigation and discussion were commenced by the AESC on June 19, 1979. The modifications of the reactor installation are the increase of new fuel storage capacity from about 1/3 to about 2/3 of in-core fuel for each plant, the new establishment of a miscellaneous solid waste incinerator which is common to both plants, and the enlargement of a solid waste storage which is also common to both plants. The contents of the safety examination for each item written above are presented. The prevention of criticality is carefully practiced for the new fuel storage by putting fuel assemblies in stainless steel can type racks and locating the fuel assemblies at the proper distance. The miscellaneous solid waste incinerator building is designed as the B class aseismatic structure and also as the controlled area with adequate shielding and ventilating facilities. The decontamination factor of the incinerator facility is more than 10 5 , and the necessary monitoring system is provided in the building. Concerning the solid waste storage, the additional storage area is about 1600 m 2 , and the storage capacity is about ten years quantity. This building is designed as the B class aseismatic structure. (Nakai, Y.)

  16. Financial Performance of Pension Companies Operating in Turkey with Topsis Analysis Method

    OpenAIRE

    Gulsun Isseveroglu; Ozan Sezer

    2015-01-01

    In this study, financial performances of the companies were analyzed by TOPSIS method via using financial tables of the sixteen pension and life-pension companies. Firstly, financial ratios which are one of the important indicators for the financial power of companies were determined and calculated for each company separately. Calculated ratios converted to demonstrate of company performance unique point by using TOPSIS method. Companies have sorted according to their calculated performance s...

  17. Qualification of the Taiwan Power Company's pressurized water reactor physics methods using CASMO-4/SIMULATE-3

    Energy Technology Data Exchange (ETDEWEB)

    Lin, Hsien-Chuan, E-mail: linsc@iner.org.tw [Nuclear Engineering Division, Institute of Nuclear Energy Research, 1000, Wenhua Rd., Jiaan Village, Longtan Township, Taoyuan County 32546, Taiwan (China); Yaur, Shung-Jung; Lin, Tzung-Yi; Kuo, Weng-Sheng; Shiue, Jin-Yih; Huang, Yu-Lung [Nuclear Engineering Division, Institute of Nuclear Energy Research, 1000, Wenhua Rd., Jiaan Village, Longtan Township, Taoyuan County 32546, Taiwan (China)

    2012-12-15

    Highlights: Black-Right-Pointing-Pointer Studsvik's core management system (CMS) was applied to Taiwan Power Company's pressurized water reactor. Black-Right-Pointing-Pointer Advanced calculation model of shutdown cooling, B-10 depletion and integrated pin exposure were introduced. Black-Right-Pointing-Pointer Core characteristic parameters such as boron letdown, low power physics test (LPPT) predictions, and reaction rate were validated to measurement data. Black-Right-Pointing-Pointer The uncertainty of each item was quantified. - Abstract: This paper presents the validation of Studsvik core management system (CMS) for application to the Maanshan units 1 and 2 reactor core physics analysis (Huang and Yang, 1994). The methodology was validated by demonstrating the ability to obtain accurate and reliable results for various conditions and applications. Core characteristic parameters such as boron letdown, low power physics test (LPPT) predictions, and reaction rate were validated. Analytical results have been compared to measured data and reliability factors of the method have been quantified.

  18. The influence nuclear power has on corporate image and the effect of offering merit information of nuclear power

    International Nuclear Information System (INIS)

    Oiso, Shinichi

    2006-01-01

    Many electric power companies in Japan, irrespective of their nuclear power generation ratio's difference, have nuclear power plants. These days, corporate brand image is becoming more and more important. Therefore, a survey was carried out to study the effect that nuclear power (including comparison with the other type of industry besides electric power) has on the corporate image of an electric power company. Further more, the survey includes a research about the effect on people's attitude change towards nuclear power before and after discovering the merits or benefits of nuclear power. The possibility of enhancing the corporate brand image of electric power companies by providing merit information of nuclear power was studied. (author)

  19. Memorial 1997 - ENDESA (Chilean Electricity Company); ENDESA - Memoria 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-12-31

    This report provides a comprehensive survey, in depth assessment of the activities overview of ENDESA, Chilean Electricity Company, highlighting economical information and including historical and technical aspects. Economics is its focal point, but other relevant data are shown, like technical data on hydroelectric and thermoelectric power plants. Main activities developed by ENDESA are described, such in Chile as in the foreign. Data on power generation, transmission and transport are also presented and an economical balance of each colligated company are done and analysed 35 figs., 115 tabs.

  20. The cost of operating with failed fuel at Virginia power

    International Nuclear Information System (INIS)

    Ford, C.A.

    1988-01-01

    Virginia Power has completed a study of the costs incurred due to fuel failures in its pressurized water reactors. This study was prompted by histories of high primary coolant activity and subsequent fuel inspections at the North Anna and Surry power stations. The study included an evaluation of the total costs of fuel failures as well as an evaluation of the economics of postirradiation fuel inspections. The major costs of fuel failures included personnel radiation exposure, permanently discharged failed fuel, radwaste generation, increased labor requirements, containment entry delays due to airborne radioactivity, and ramp rate restrictions. Although fuel failures affect a utility in several other areas, the items evaluated in the study were thought to be the most significant of the costs. The study indicated that performing a postirradiation failed fuel examination can be economically justified at tramp-corrected 131 I levels of > 0.015 μCi/g. The savings to the utility can be on the order of several million dollars. Additionally, the cost penalty of performing a fuel inspection at lower iodine levels is generally in the range of $200,000. This economic penalty is expected to be outweighed by the intangible benefits of operating with a defect-free core

  1. Planning and administration of human resources in Brazilian Electric Power Companies; Planejamento e administracao de recursos humanos nas empresas brasileiras do setor de energia eletrica

    Energy Technology Data Exchange (ETDEWEB)

    Dias, Devanir Vieira

    1985-12-01

    Administration and planning of human resources in Brazilian Companies of Electric Power Sector analyzes the evolution of the concept of business planning. This work explore the specific literature of this theme, giving emphasis in predict methods and human resources development and planning models. Is also presented a case study, realized in 1979, which comprehended 84 % of Brazilian Energy Companies. This study aims to evaluate the results of an implementation of this planning and development models 64 refs., 12 figs., 22 tabs.

  2. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Summary of results. Volume 1

    International Nuclear Information System (INIS)

    Whitehead, D.W.; Staple, B.D.; Daniel, S.L.

    1995-07-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to examine the potential risks during low power and shutdown operations. Two plants, Surry and Grand Gulf, were selected as the plants to be studied by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). This report documents the work performed during the analysis of the Grand Gulf plant. A phased approach was used for the overall study. In Phase 1, the objectives were to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenario frequencies and risks, and to provide a foundation for a detailed Phase 2 analysis. It was in Phase 1 that the concept of plant operational states (POSs) was developed to allow the analysts to better represent the plant as it transitions from power operation to nonpower operation than was possible with the traditional technical specification divisions of modes of operation. This phase consisted of a coarse screening analysis performed for all POSs, including seismic and internal fire and flood for some POSs. In Phase 2, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected as the plant configuration to be analyzed based on the results of the Phase 1 study. The scope of the Level 1 study includes plant damage state analysis and uncertainty analysis and is documented in a multi-volume NUREG/CR report (i.e., NUREG/CR-6143). The internal events analysis is documented in Volume 2. Internal fire and internal flood analyses are documented in Volumes 3 and 4, respectively. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. The Level 2/3 study of the traditional internal events is documented in Volume 6, and a summary of the results for all analyses is documented in Volume 1

  3. Evaluation of potential severe accidents during low power and shutdown operations at Grand Gulf, Unit 1: Summary of results. Volume 1

    Energy Technology Data Exchange (ETDEWEB)

    Whitehead, D.W. [ed.; Staple, B.D.; Daniel, S.L. [and others

    1995-07-01

    During 1989 the Nuclear Regulatory Commission (NRC) initiated an extensive program to examine the potential risks during low power and shutdown operations. Two plants, Surry and Grand Gulf, were selected as the plants to be studied by Brookhaven National Laboratory (Surry) and Sandia National Laboratories (Grand Gulf). This report documents the work performed during the analysis of the Grand Gulf plant. A phased approach was used for the overall study. In Phase 1, the objectives were to identify potential vulnerable plant configurations, to characterize (on a high, medium, or low basis) the potential core damage accident scenario frequencies and risks, and to provide a foundation for a detailed Phase 2 analysis. It was in Phase 1 that the concept of plant operational states (POSs) was developed to allow the analysts to better represent the plant as it transitions from power operation to nonpower operation than was possible with the traditional technical specification divisions of modes of operation. This phase consisted of a coarse screening analysis performed for all POSs, including seismic and internal fire and flood for some POSs. In Phase 2, POS 5 (approximately cold shutdown as defined by Grand Gulf Technical Specifications) during a refueling outage was selected as the plant configuration to be analyzed based on the results of the Phase 1 study. The scope of the Level 1 study includes plant damage state analysis and uncertainty analysis and is documented in a multi-volume NUREG/CR report (i.e., NUREG/CR-6143). The internal events analysis is documented in Volume 2. Internal fire and internal flood analyses are documented in Volumes 3 and 4, respectively. A separate study on seismic analysis, documented in Volume 5, was performed for the NRC by Future Resources Associates, Inc. The Level 2/3 study of the traditional internal events is documented in Volume 6, and a summary of the results for all analyses is documented in Volume 1.

  4. Review of staff training plans Licensed Benchmarking on task analysis and selection of learning environments

    International Nuclear Information System (INIS)

    Iglesias Moran, J.

    2013-01-01

    The purpose of this paper is to present the findings and possible improvement actions taken after a work of technical exchange with U.S. Surry nuclear power plant. The visit focused on the study of the methodology for the analysis and design of training programs according to the standards of INPO.

  5. Contribution of service companies

    International Nuclear Information System (INIS)

    Sole, L. M.; Cortes, A.

    2002-01-01

    The most influential aspect when choosing the model of contract between Client and Contractor relapses into the maturity reached by both parts. The service supplier will have to show his competence with his resume, not only technical, but also of actual actions concerning availability reliability, maintainability, security, environment and costs. That maturity may have been the reason why most of the service companies, of national scope, that carry out maintenance of nuclear power stations electricity and instrumentation nowadays, are present from the assembly and implementation phases of these nuclear power stations. (Author)

  6. Progress of technological innovation on electric power in FY2014

    International Nuclear Information System (INIS)

    Nishikawa, Yoshikazu; Fujii, Yutaka; Sasagawa, Toshiro

    2015-01-01

    This paper overviews the technological development in FY2014 at Tokyo Electric Power Company, Chubu Electric Power Company, Hokuriku Electric Power Company, Shikoku Electric Power Company, and Electric Power Development Company. In this overview, further breakdown was made for the following departments of each company: nuclear power generation, thermal power generation, hydraulic power generation, power transmission, power distribution, transformation, research and development and technological development, and information and communication. In addition, this paper outlines the achievement of technological development at Japan Atomic Power Company, such as the technological development related to the existing power station, development of new technology, and the development of future reactor. Fukushima Daiichi Nuclear Power Station has developed an investigative system using a high altitude survey robot and a movable monitoring system. Hamaoka Nuclear Power Station examined the feasibility of state diagnostic technique based on multi-point analysis, and studied stress corrosion cracking at the newly established Nuclear Safety Research Laboratory. Shika Nuclear Power Station (Unit 1) applied a pipe stress improvement process by means of high frequency induction heating as a stress corrosion cracking countermeasure. Ikata Nuclear Power Station newly adopted high degree cross-linking cation resin, and high cracking strength anion resin as the primary resins. Oma Nuclear Power Station worked on the all reactor core utilization technology of MOX fuel. (A.O.)

  7. 78 FR 32278 - Vogtle Electric Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to...

    Science.gov (United States)

    2013-05-29

    ... Generating Station, Units 3 and 4; Southern Nuclear Operating Company; Change to Information in Tier 1, Table... Nuclear Operating Company, Inc., and Georgia Power Company, Oglethorpe Power Corporation, Municipal... Table 3.3-1, ``Definition of Wall Thicknesses for Nuclear Island Buildings, Turbine Buildings, and Annex...

  8. Assessing the financial positions of Ontario`s new electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Connell, T. [Standard and Poor`s, Toronto, ON (Canada)

    1999-11-01

    This paper describes the methodology, including the criteria factors, comparable ratings and key credit issues used in assessing the financial positions of Ontario Power Generation Inc., and the Ontario Hydro Services Company. The rating criteria factors include both business factors (such as ownership structure, regulation, service area, operations, management, etc.,) and financial factors (e.g. financial policies and guidelines, recent financial performance, margin analysis, capital structure and borrowing plans, financial projections and sensitivities). Key credit issues include considerations of competitive dynamics, nuclear portfolio performance (for Genco), regulatory changes, cost control, capital spending program, retail business exposure, future financial performance. Comparisons are made with corresponding positions of comparable entities in Australia, Finland, New Zealand, the UK, and the USA. In the case of Ontario Power Generation Inc., the company is assessed to have significant advantages initially, but various uncertainties over the medium term warrant a more cautious view of the credit profile. For the Ontario Hydro Services Company the business risks appear to be low and moderate leverage entails a strong, stable credit profile. The overall assessment of the two companies is that while certain questions such as the workability and credibility of the new industry structure, the problem of stranded debt and questions about the liquidity of market participants remain unsolved, Ontario Power Generation Inc., and the Ontario Hydro Services Company ratings compare favorably with ratings of global industry peers.

  9. Operation management and network control in interconnected power supply companies - saving potentials, concepts, solutions; Betriebsfuehrung und Netzleittechnik in Querverbundunternehmen - Einsparpotentiale, Konzepte, Loesungen

    Energy Technology Data Exchange (ETDEWEB)

    Osswald, W.

    1997-12-31

    Most municipal power supply companies in Germany are horizontally integrated. To enhance their economic efficiency these companies are currently reorganising their traditional business sectors and preparing and developing new ones in the area of communal services. In this process every effort is made being made to introduce and use the full instrumentarium of modern information technology throughout the company as soon as possible. The restructuring process necessitates effectively reducing whatever objectively inevitable risks it entails and reliably solving arising conflicts. The present contribution relates some experiences from work on this project. [Deutsch] Kommunale Versorgungsunternehmen sind in Deutschland mehrheitlich Querverbundunternehmen. Aktuell werden in diesen Unternehmen die herkoemmlichen Geschaeftsbereiche zur Steigerung der wirtschaftlichen Effizienz reorganisiert und neue Geschaeftsfelder fuer kommunale Dienstleistungen vorbereitet und erschlossen. Dieser Prozess ist zugleich durch das Bemuehen gekennzeichnet, alle Moeglichkeiten der modernen Informationstechnik moeglichst schnell unternehmensweit einzufuehren und zu nutzen. Hierbei muessen objektiv gegebene Risiken wirksam begrenzt und auftretende Konflikte zuverlaessig geloest werden. Der vorliegende Beitrag vermittelt einige Erfahrungen aus der Projektarbeit. (orig./RHM)

  10. Maintenance of EDF nuclear power plants and servicing companies. Progress report

    International Nuclear Information System (INIS)

    Baize, Jean-Marc; Reveillon, Sylvie

    1997-01-01

    French Electricity Company (EDF - Electricite de France) and the associated servicing companies, engaged in maintenance partnership from 1991, reinforce and expand their policy by undersigning a progress charter, to cope with the safety and nuclear sector competition issues. This charter stipulates the mutual engagements in the following sectors: 1. Transparency in calling for servicing; 2. Development of the intervenors' professionalism; 3. Improvement in forecasting activity tasks; 4. Radioprotection; 5. Safety and working conditions. The 55 reactors of the EDF nuclear stock are stopped annually for around 6 weeks for refueling. On this occasion the essential maintenance works necessary to ensure the optimal safety of the installations are carried out. The maintenance requires the intervention of 30,000 employees, 10,000 EDF agents and 20,000 external intervenors and represents an amount of 14 million working hours. The full maintenance expenses amounts up to 11 billion FF in 1996, 6 billion of which are assigned to external companies

  11. Experience of Minas Gerais Energetic Company (CEMIG) in feasibility studies from hydroelectric power plants: energetic-economic studies

    International Nuclear Information System (INIS)

    Ramos, O.C.; Bras, A.J.F.; Batista Neto, R.P.; Salles Filho, M.P.

    1989-01-01

    The experience of Minas Gerais Energetic Company (CEMIG) - Brazil, on the use of dimensioning methodology for hydroelectric power plant from the Coordinated Group of Planning System was described, showing the problems with its use and the solutions, mainly the reservoir and the dimension of installed potential. It was concluded that the calculation procedures of the marginal costs for dimensioning, so as to become these costs more representative in future structure of the Brazilian generator park and less dependent to the oscillation due to conjuncture problems, must be re-evaluated. (C.G.C.). 7 refs, 3 figs, 1 tab

  12. Examining the cost efficiency of Chinese hydroelectric companies using a finite mixture model

    International Nuclear Information System (INIS)

    Barros, Carlos Pestana; Chen, Zhongfei; Managi, Shunsuke; Antunes, Olinda Sequeira

    2013-01-01

    This paper evaluates the operational activities of Chinese hydroelectric power companies over the period 2000–2010 using a finite mixture model that controls for unobserved heterogeneity. In so doing, a stochastic frontier latent class model, which allows for the existence of different technologies, is adopted to estimate cost frontiers. This procedure not only enables us to identify different groups among the hydro-power companies analysed, but also permits the analysis of their cost efficiency. The main result is that three groups are identified in the sample, each equipped with different technologies, suggesting that distinct business strategies need to be adapted to the characteristics of China's hydro-power companies. Some managerial implications are developed. - Highlights: ► This paper evaluates the operational activities of Chinese electricity hydric companies. ► This study uses data from 2000 to 2010 using a finite mixture model. ► The model procedure identifies different groups of Chinese hydric companies analysed. ► Three groups are identified in the sample, each equipped with completely different “technologies”. ► This suggests that distinct business strategies need to be adapted to the characteristics of the hydric companies

  13. Advance in technologies of electric power in 2008

    International Nuclear Information System (INIS)

    Hamada, Kenichi; Maekawa, Fumiaki; Nakamura, Akio

    2008-01-01

    Ten electric power companies and two related companies reported their advance in technologies. The technologies of nuclear power plants were stated by ten companies, which consisted of introduction of new main control board to Tomari-3 in Hokkaido Electric Power Co., Inc., reduction methods of exposure dose of Higashidori-1 in Tohoku Electric Power, hot water based two-phase flow testing device for pipe thinning test by Tokyo Electric Power Company, Guideline for prevention of piping damage caused by combustion of mixture gases in BWR (the second edition) published by Thermal and Nuclear Power Engineering Society, setting up distributor in the low-pressure turbine of Shika-2 in Hokuriku Electric Power Company, development of rapid estimation method of release radioactivity and application of high density neutron source to nuclear transmutation of nuclear fuel cycle and introduction of new core monitor system by The Kansai Electric Power Co., Inc., upgrade of investigation of the effects of hot waste water and development of detector for dropout parts of cooling system in reactor by Shikoku Electric Power Co., Inc., change of transformer in Sendai-1 by Kyushu Electric Power Co., Inc., and reactor core design for Oma ABWR by J-Power. The Japan Atomic Power Company reported four articles such as development of technologies for established nuclear power plants, promotion of Tsuruga-3 and Tsuruga-4, application of clearance system in Japan and development of future reactors. (S.Y.)

  14. Why Companies Fail? The Boiling Frog Syndrome

    OpenAIRE

    Ozcan, Rasim

    2018-01-01

    Why nations fail? An answer is given by Acemoglu and Robinson (2012) by pointing out the importance of institutions for an economy that leads to innovations for economic growth. Christensen (2012) asks a similar question for a firm and diagnoses why companies fail. In this study, I relate Acemoglu and Robinson (2012) with Christensen (2012) in order to better understand how to make companies more prosperous, more powerful, healthier, and live longer via innovations.

  15. Will cross-ownership reestablish market power in the Nordic power market?

    International Nuclear Information System (INIS)

    Amundsen, Eirik S.; Bergman, Lars

    2000-01-01

    The integration of the power markets in Norway and Sweden in 1996 significantly constrained the major power companies' ability to exercise market power within their national borders. In recent years, however, mergers and reciprocal acquisition of shares have reduced the number of independent players on the Norwegian-Swedish power market. The aim of this paper is to explore to what extent increasing cross-ownership among major power companies in Norway and Sweden might re-establish the market power that was lost when the two national power markets were integrated. The analysis is based on a numerical model, assuming Cournot quantity setting behaviour, of the Norwegian-Swedish power market. The simulation results suggest that partial ownership relations between major generators and other power-producing firms tend to increase horizontal market power and thus the market price of electricity. (author)

  16. An optimization model for natural gas supply portfolios of a power generation company

    International Nuclear Information System (INIS)

    Jirutitijaroen, Panida; Kim, Sujin; Kittithreerapronchai, Oran; Prina, José

    2013-01-01

    Highlights: ► An optimization model for daily operation of a natural gas-fired generation company is proposed. ► The model considers uncertainties in electricity price and natural gas price. ► The model is formulated to capture the hedging decisions by the company. ► The solution yields quantities of natural gas, generating schedule and purchasing quantities of electricity. ► Higher profit can be achieved by adapting inventory and production to the actual spot prices of natural gas and electricity. - Abstract: This paper considers a deregulated electricity market environment where a natural gas-fired generation company can engage in different types of contracts to manage its natural gas supply as well as trade on the electricity market. If the contracts are properly designed, they can protect the company from fluctuations in electricity price and demand, at some cost to the company’s expected profit. This reduction in profit can be mitigated by trading on the natural gas and electricity spot markets, but this trading activity may also sometimes result in losses. A stochastic programming model is formulated to capture the hedging decisions made by the company, as well as the interactions between the natural gas and electricity markets. The benefits offered by this approach for profit maximization in a variety of business scenarios, such as the case where the company can hold some amount of gas in storage are studied and presented. It is found that the stochastic model enables the company to optimize the electricity generation schedule and the natural gas consumption, including spot price transactions and gas storage management. Several managerial insights into the natural gas market, natural gas storage, and distribution profit are given

  17. 供电公司财务管理水平提升策略探讨%On the Strategies for Improving Financial Management Level of the Power Supply Company

    Institute of Scientific and Technical Information of China (English)

    时小力

    2014-01-01

    供电公司中重要的环节就是财务管理,企业经营管理和公司财务管理水平高低有着直接的关系。本文将针对供电公司财务管理水平提升策略进行探讨。%The financial management is an important link in the power company, and business management has a direct relationship with financial management level of the enterprises. This article discusses the strategies for improving financial management level of the power supply company.

  18. Radionuclide release calculations for selected severe accident scenarios

    International Nuclear Information System (INIS)

    Denning, R.S.; Leonard, M.T.; Cybulskis, P.; Lee, K.W.; Kelly, R.F.; Jordan, H.; Schumacher, P.M.; Curtis, L.A.

    1990-08-01

    This report provides the results of source term calculations that were performed in support of the NUREG-1150 study. ''Severe Accident Risks: An Assessment for Five US Nuclear Power Plants.'' This is the sixth volume of a series of reports. It supplements results presented in the earlier volumes. Analyses were performed for three of the NUREG-1150 plants: Peach Bottom, a Mark I, boiling water reactor; Surry, a subatmospheric containment, pressurized water reactor; and Sequoyah, an ice condenser containment, pressurized water reactor. Complete source term results are presented for the following sequences: short term station blackout with failure of the ADS system in the Peach Bottom plant; station blackout with a pump seal LOCA for the Surry plant; station blackout with a pump seal LOCA in the Sequoyah plant; and a very small break with loss of ECC and spray recirculation in the Sequoyah plant. In addition, some partial analyses were performed which did not require running all of the modules of the Source Term Code Package. A series of MARCH3 analyses were performed for the Surry and Sequoyah plants to evaluate the effects of alternative emergency operating procedures involving primary and secondary depressurization on the progress of the accident. Only thermal-hydraulic results are provided for these analyses. In addition, three accident sequences were analyzed for the Surry plant for accident-induced failure of steam generator tubes. In these analyses, only the transport of radionuclides within the primary system and failed steam generator were examined. The release of radionuclides to the environment is presented for the phase of the accident preceding vessel meltthrough. 17 refs., 176 figs., 113 tabs

  19. What next steps in nuclear power?

    International Nuclear Information System (INIS)

    Novak, J.

    1991-01-01

    Following the political changes in Czechoslovakia in the late 1989, preparation of a new energy policy began in the second half of 1990. The principles of this new policy include an increase in the share of electricity in the energy balance, based on an increase in the contribution of nuclear power plants. This new nuclear policy should be oriented to the use of state-of-the-art technologies from world's foremost manufacturers such as Framatome, Siemens-KWU, ABB - Combustion Engineering, Mitsubishi and Westinghouse. In February 1991, companies associated in a consortium, viz. the Czech Power Company, the Slovak Power Company, the Czechoslovak Uranium Industry and Energoprojekt, sent the world manufacturers a preliminary invitation of tenders. The bids are now being evaluated by the Belgian company Belgatom and by the Czechoslovak company Energoprojekt. The completion of the feasibility study is conditional on the decision concerning the siting of a new nuclear power plant. (Z.S.). 1 tab

  20. 77 FR 10501 - Northeast Utilities Service Company; Notice of Petition for Declaratory Order

    Science.gov (United States)

    2012-02-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-25-000] Northeast Utilities Service Company; Notice of Petition for Declaratory Order Take notice that on February 8, 2012, Northeast Utilities Service Company (NUSCO), on behalf of the Connecticut Light and Power Company, Public...

  1. Technology transfer for reduced environmental pollution in the former USSR - the role of Western companies

    Energy Technology Data Exchange (ETDEWEB)

    Hill, M.R.

    1995-12-01

    The paper is divided into two main sections, the first presenting information on the volumes of Western exports of power engineering products to the former USSR, and the second describing the technology transfer experiences of a sample of Western power generation, fuels, and power engineering companies. The information relating to those companies was obtained from published information and press reports, and visits for discussions with senior executives during 1994 and 1995. Companies involved in technology transfer and investment activities described in the report are: IVO International Ltd., CRE Group Ltd., Asea Brown Boveri, Siemens Kraftwerkunion, GEC Alsthorn Rolly Royce Industrial Power Group, Babcock Energy, Deutsche Babcock AG, Alsthom Boilers, and GE Corporation. 35 refs., 5 tabs.

  2. Beginning Power BI with Excel 2013 self-service business intelligence using Power Pivot, Power View, Power Query, and Power Map

    CERN Document Server

    Clark, Dan

    2014-01-01

    Understanding your company's data has never been easier than with Microsoft's new Power BI package for Excel 2013. Consisting of four powerful tools-Power Pivot, Power View, Power Query and Power Maps-Power BI makes self-service business intelligence a reality for a wide range of users, bridging the traditional gap between Excel users, business analysts and IT experts and making it easier for everyone to work together to build the data models that can give you game-changing insights into your business. Beginning Power BI with Excel 2013 guides you step by step through the process of analyzin

  3. Taking the reins of power

    International Nuclear Information System (INIS)

    Cavenagh, Andrew.

    1997-01-01

    The growing contract energy management business in the United Kingdom is examined. At the top end, established electricity generators are supplying combined heat and power plants of over 20MW or so to meet the steam, power and heating requirements of large industrial sites on contracts of, typically, 15-20 years. These are very much the province of companies such as National Power and PowerGen familiar with linking into the high voltage transmission system and hence able to sell surplus power from these projects into the National Grid. A much wider range of services is on offer by other more specialised companies. These range from the supply and operation of combined heat and power plants to smaller companies, to fuel purchasing contracts and the monitoring of energy consumption of existing facilities in public buildings. Cost cutting is the driving attraction of contract energy management for the purchasers, but there are other advantages. The view of one company, for example, is that it enables them to focus on their core business while leaving energy production and management to a third party whose core business that is. Energy costs become totally forecastable and expertise is always at hand. (UK)

  4. Evaluation of environmental impact predictions

    International Nuclear Information System (INIS)

    Cunningham, P.A.; Adams, S.M.; Kumar, K.D.

    1977-01-01

    An analysis and evaluation of the ecological monitoring program at the Surry Nuclear Power Plant showed that predictions of potential environmental impact made in the Final Environmental Statement (FES), which were based on generally accepted ecological principles, were not completely substantiated by environmental monitoring data. The Surry Nuclear Power Plant (Units 1 and 2) was chosen for study because of the facility's relatively continuous operating history and the availability of environmental data adequate for analysis. Preoperational and operational fish monitoring data were used to assess the validity of the FES prediction that fish would congregate in the thermal plume during winter months and would avoid the plume during summer months. Analysis of monitoring data showed that fish catch per unit effort (CPE) was generally high in the thermal plume during winter months; however, the highest fish catches occurred in the plume during the summer. Possible explanations for differences between the FES prediction and results observed in analysis of monitoring data are discussed, and general recommendations are outlined for improving impact assessment predictions

  5. Gas supplies of interstate natural gas pipeline companies, 1991

    International Nuclear Information System (INIS)

    1992-01-01

    This publication provides information on the total reserves, production, and deliverability capabilities of the 64 interstate pipeline companies required to file the Federal Energy Regulatory Commission (FERC) Form 15, ''Interstate Pipeline's Annual Report of Gas Supply.'' Data reported on this form are not considered to be confidential. This publication is the 29th in a series of annual reports on the total gas supplies of interstate pipeline companies since the inception of individual company reports to the Federal Power Commission (FPC) in 1964 for report year 1963

  6. The structure of trust in the safety of nuclear power generation

    International Nuclear Information System (INIS)

    Watabe, Motoki; Haruna, Yasuhiro; Kitada, Atsuko.

    1994-01-01

    The purpose of this research is to clarify the structure of people's trust in electric power companies and nuclear power generation. For this purpose, we carried out questionnaire surveys in the United States and Japan with a special emphasis on the trustworthiness of electric power companies. The results indicated that trustworthiness of electric power companies were rated higher by Americans than by Japanese. Furthermore, trustworthiness of electric power companies in the United States was highly correlated with their trustfulness in private companies in general, whereas one in Japan was rather than correlated with their trust level in the government. This difference may imply Americans do not differentiate electric power companies from other private organizations, while Japanese assign a special status to them closely linked to the government. (author)

  7. Micro CHP: implications for energy companies

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, Jeremy [EA Technology (United Kingdom); Kolin, Simon; Hestevik, Svein [Sigma Elektroteknisk A/S (Norway)

    2000-08-01

    This article explains how micro combined heat and power (CHP) technology may help UK energy businesses to maintain their customer base in the current climate of liberalisation and competition in the energy market The need for energy companies to adopt new technologies and adapt to changes in the current aggressive environment, the impact of privatisation, and the switching of energy suppliers by customers are discussed. Three potential routes to success for energy companies are identified, namely, price reductions, branding and affinity marketing, and added value services. Details are given of the implementation of schemes to encourage energy efficiency, the impact of the emissions targets set at Kyoto, the advantages of micro CHP generation, business opportunities for CHP, business threats from existing energy companies and others entering the field, and the commercial viability of micro CHP.

  8. Assessing the financial positions of Ontario's new electricity companies

    Energy Technology Data Exchange (ETDEWEB)

    Connell, T. (Standard and Poor' s, Toronto, ON (Canada))

    1999-01-01

    This paper describes the methodology, including the criteria factors, comparable ratings and key credit issues used in assessing the financial positions of Ontario Power Generation Inc., and the Ontario Hydro Services Company. The rating criteria factors include both business factors (such as ownership structure, regulation, service area, operations, management, etc.,) and financial factors (e.g. financial policies and guidelines, recent financial performance, margin analysis, capital structure and borrowing plans, financial projections and sensitivities). Key credit issues include considerations of competitive dynamics, nuclear portfolio performance (for Genco), regulatory changes, cost control, capital spending program, retail business exposure, future financial performance. Comparisons are made with corresponding positions of comparable entities in Australia, Finland, New Zealand, the UK, and the USA. In the case of Ontario Power Generation Inc., the company is assessed to have significant advantages initially, but various uncertainties over the medium term warrant a more cautious view of the credit profile. For the Ontario Hydro Services Company the business risks appear to be low and moderate leverage entails a strong, stable credit profile. The overall assessment of the two companies is that while certain questions such as the workability and credibility of the new industry structure, the problem of stranded debt and questions about the liquidity of market participants remain unsolved, Ontario Power Generation Inc., and the Ontario Hydro Services Company ratings compare favorably with ratings of global industry peers.

  9. Risk-based inspection of nuclear power plants

    International Nuclear Information System (INIS)

    Masopust, R.

    1995-01-01

    A multidiscipline research programme was developed in the USA to establish risk-based inspections for NPP structures and equipment components. Based on this US research effort, the risk-based procedure for developing inspection guidelines for NPPs is described. The procedure includes the definition of systems, qualitative risk assessment, qualitative risk analysis and development of the inspection programme. The method, when adopted and modified, is recommended also for risk-based inspections of structures and equipment of WWER-type NPPs. A pilot application of the method to unit 1 of the Surry NPP is summarized. (Z.S.) 1 tab., 1 fig., 5 refs

  10. Results of photovoltaic power generation system operation in Tokyo Electric Power Company; Tokyo Denryoku ni okeru taiyoko hatsuden setsubi no unten jisseki ni tsuite

    Energy Technology Data Exchange (ETDEWEB)

    Fukuda, H; Itokawa, K [Tokyo Electric Power Co. Inc., Tokyo (Japan)

    1996-10-27

    A report was made on the measurement of data and the results of the analysis at 14 sites of photovoltaic power generation facilities operated under system interconnection by Tokyo Electric Power Company. This type of system is provided in 40 sites as of the end of fiscal 1995, generating 479kw. The items measured were the generated electric energy at all 14 sites, and the quantity of solar radiation, outside air temperature, panel temperature, etc., at limited sites; and the capacity of each equipment, azimuth and inclination of the panel were also recorded simultaneously. Hourly values were used for the analysis. Five minute values were utilized, however, in the examination of the cause of lowered output and in the situation recognition of the influence of the shade or the change of weather. The utilization factor of the facilities was in the average 10.8% in fiscal 1994 and 10.7% in fiscal 1995. The factor decreased slightly unless the panel azimuth faced due south. The utilization factor at the panel inclination of 35 degrees and 45 degrees showed both 10.4% through the year making no difference. The system seemed to show no overwhelming possibilities in coping with electric power demand. The reason was that deviation existed for 2 hours or so in the peak and that reliability was low as basic power facilities. However, it was determined that the system be continuously examined in future. 9 figs., 1 tab.

  11. Experiments to investigate direct containment heating phenomena with scaled models of the Surry Nuclear Power Plant

    International Nuclear Information System (INIS)

    Blanchat, T.K.; Allen, M.D.; Pilch, M.M.

    1994-01-01

    The Containment Technology Test Facility (CTTF) and the Surtsey Test Facility at Sandia National Laboratories (SNL) are used to perform scaled experiments for the Nuclear Regulatory Commission (NRC) that simulate High Pressure Melt Ejection (HPME) accidents in a nuclear power plant (NPP). These experiments are designed to investigate the effects of direct containment heating (DCH) phenomena on the containment load. High-temperature, chemically reactive melt is ejected by high-pressure steam into a scale model of a reactor cavity. Debris is entrained by the steam blowdown into a containment model where specific phenomena, such as the effect of subcompartment structures, prototypic atmospheres, and hydrogen generation and combustion, can be studied

  12. Advance of technological innovations of electric power in 2012

    International Nuclear Information System (INIS)

    Mayumi, Akihiko; Tanaka, Masanori; Takebe, Toshiro

    2013-01-01

    Twelve companies in Japan reported on the technological innovations in 2012. The Japan Atomic Power Company mainly studied five projects; (1) control of wall thinning of the secondary system in PWR by injection of molybdic acid, (2) application of pipe test method using electromagnetic acoustic resonance to existing equipment, (3) developed high performance Co-60 crud removal resin for Tsuruga Power Station Unit 2, (4) improvement of technology for safety of core in FBR, and (5) improvement of technology for coolant of FBR by dispersing nano-particles in liquid sodium metal. Tokyo Electric Power Company developed mainly three projects; (1) the support for the mental health care activities by industry protection staff at the Fukushima Daiichi and Daini Nuclear Power Plant, (2) laboratory test method using non-radioactive cesium for performance of decontamination reagent, and (3) decontamination effects estimation code (DeConEP). Hokuriku Electric Power Company reported the operations management measures in accordance with the safety enhancement measures to Shika nuclear power station. Other nine reports are published by Hokkaido Electric Power Co., Inc. Tohoku Electric Power Co., Inc. Chubu Electric Power Co., Inc., The Kansai Electric Power Co., Inc., The Chugoku Electric Power Co., Inc., Shikoku Electric Power Co., Inc., Kyushu Electric Power Co., Inc., Okinawa Electric Power Company Inc. and J-Power. (S.Y.)

  13. Global Infrastructure Investment, Competition,and the Japanese Companies

    OpenAIRE

    新保, 博彦; シンポ, ヒロヒコ; Hirohiko, SHIMPO

    2011-01-01

    This paper discusses four infrastructure industries all of which are expected to grow rapidly in the 21st century: the electric power industry, the water industry, the railroad industry, and the aircraft and space development. First, this paper describes the general trends of the FDI in the four noted industries. Based on the above examinations, this paper investigates these industrial trends, focusing on specific companies in various countries. To investigate each individual company, this pa...

  14. 12 CFR 225.143 - Policy statement on nonvoting equity investments by bank holding companies.

    Science.gov (United States)

    2010-01-01

    ... CONTROL (REGULATION Y) Regulations Financial Holding Companies Interpretations § 225.143 Policy statement on nonvoting equity investments by bank holding companies. (a) Introduction. (1) In recent months, a... company has the power, directly or indirectly, to exercise a controlling influence over the management or...

  15. Results and insights of a level-1 internal event PRA of a PWR during mid-loop operations

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.; Yang, J.; Bozoki, G.; Hsu, C.J.; Diamond, D.J.; Wong, S.M.; Holmes, B.; Su, R.F.; Dang, V.; Siu, N.; Bley, D.; Johnson, D.; Lin, J.

    1994-01-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analysis that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. During 1989, the Nuclear Regulatory Commission (NRC) initiated an extensive program to carefully examine the potential risks during low power and shutdown operations. The program includes two parallel projects being performed by BNL and SNL. Two plants, Surry (pressurized water reactor) and Grand Gulf (boiling water reactor), were selected as the plants to be studied. The objectives of the program are to assess the risks of severe accidents initiated during plant operational states other than full power operation and to compare the estimated core damage frequencies, important accident sequences and other qualitative and quantitative results with those accidents initiated during full power operation as assessed in NUREG-1150. The scope of the program includes that of a level-3 PRA. The objective of this paper is to present the approach utilized in the level-1 PRA for the Surry plant, and discuss the results obtained. A comparison of the results with those of other shutdown studies is provided. Relevant safety issues such as plant and hardware configurations, operator training, and instrumentation and control is discussed

  16. 78 FR 68903 - Dynegy Inc., Illinois Power Holdings, LLC and Illinois Power Holdings II, LLC-Acquisition of...

    Science.gov (United States)

    2013-11-15

    ... and Western Railroad Company and Joppa & Eastern Railroad Company Dynegy Inc. (Dynegy), Illinois Power... Coffeen and Western Railroad Company (CWRC) and the Joppa & Eastern Railroad (JERR), both Class III rail...

  17. Effects of a power shortage in the Tokyo metropolitan area on awareness of nuclear power generation and power savings behavior

    International Nuclear Information System (INIS)

    Kitada, Atsuko

    2004-01-01

    The shutdown of a number of nuclear power stations of the Tokyo Electric Power Company in the summer of 2003 caused a power shortage problem in the Tokyo Metropolitan area. To examine the effects of the power shortage, in September 2003 a survey was conducted in the service areas of the Kansai Electric Power Company (Kansai region) and the Tokyo Electric Power Company (Kanto region). This survey was part of a wider opinion survey begun in 1993 concerning nuclear power generation. The results of the September 2003 survey are as follows: The degree of recognition of the power shortage problem in the Metropolitan area was high, with 40% of respondents in the Kansai region and nearly 70% in the Kanto region understanding that the shortage was caused by the shutdown of several nuclear power station. The overall awareness of nuclear power generation was little affected in both the Kansai and Kanto regions, though the sense of a shortage of the generating capacity had been raised slightly. Once respondents knew about the power shortage problem, they estimated the likelihood of an occurrence of large-scale service interruption to be low, nearly at an even chance, and they had been only slightly worried about it, essentially viewing the problem optimistically. In the Kanto region, where public relations activities for power savings had been actively pursued, the frequency of experiencing exposure to such public relations activities was remarkably higher than in the Kansai region. The relation between exposure to public relations activities for power savings and power savings behavior was analyzed using quantification method II. Analysis results suggest that public relations activities for power savings in the Kanto region had the effect of urging power savings behavior. However, the difference in the rate of putting power savings behavior into practice was small between the Kanto and Kansai regions, indicating that public relation activities for power savings in the Kanto

  18. 18 CFR 367.1110 - Account 111, Accumulated provision for amortization of service company property.

    Science.gov (United States)

    2010-04-01

    ... THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING... (§ 367.4040), for the current amortization of limited-term service company property investments. (2...

  19. 18 CFR 367.4114 - Account 411.4, Investment tax credit adjustments, service company property.

    Science.gov (United States)

    2010-04-01

    ..., Investment tax credit adjustments, service company property. 367.4114 Section 367.4114 Conservation of Power... Operating Income § 367.4114 Account 411.4, Investment tax credit adjustments, service company property. This account must include the amount of those investment tax credit adjustments that relate to service company...

  20. Operational and Environmental Efficiencies of Japanese Electric Power Companies from 2003 to 2015: Influence of Market Reform and Fukushima Nuclear Power Accident

    Directory of Open Access Journals (Sweden)

    Mika Goto

    2017-01-01

    Full Text Available This study measures operational and environmental efficiencies of nine incumbent electric power companies (EPCos in Japan and examines an influence of market reform and Fukushima nuclear power plant accident on efficiencies using a data set from 2003 to 2015. This study applies output-oriented radial data envelopment analysis (DEA model to the measurement of efficiencies. Three inputs and three desirable outputs are used for the measurement of operational efficiency, and one undesirable output besides inputs and desirable outputs is used to measure environmental efficiency. EPCos produce not only desirable output, for example, electricity, but also undesirable output, for example, CO2, for their operations. For the measurement of environmental efficiency, this study uses a unique DEA model that assumes occurrence of ecotechnology innovation. The results reveal that environmental efficiency of EPCos is mostly invariant over the period of this study, while operational efficiency decreases in the same period. In addition, the results present that Japanese EPCos make efforts to reduce CO2 emissions by promoting ecotechnology innovation. The Kruskal–Wallis rank sum test indicates differences in operational and environmental efficiencies among EPCos. Such performance differences might become larger as market liberalization advances, which could lead to further structural changes of the industry.

  1. Independent System Operators and Biomass Power

    International Nuclear Information System (INIS)

    Porter, Kevin L.

    1999-01-01

    Since the Federal Energy Regulatory Commission issued its landmark open access transmission rule in 1996, the idea of creating and establishing independent system operators (ISOs) has gained momentum. ISOs may help combine individual utility transmission systems into more regional transmission networks, which ultimately will allow biomass companies to transmit power over longer distances while paying a single transmission rate. To the extent that ISOs are combined or operated with power exchanges, however, biomass companies will likely face even more competitive market pressures. Few operators have experience with ISOs and power exchanges, but preliminary results show that short-term electricity market prices are probably too low for most biomass companies to compete against. Without policy measures, biomass companies may have to pursue strategic opportunities with short-term, spot-market sales; direct bilateral sales to customers; alternative power exchanges; and perhaps a ''green'' power market and sales to ancillary service markets. In addition, prices will likely be more volatile in a restructured market so biomass generators should be selling during those times

  2. Power programmes review: Nuclear power in Italy

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1959-07-15

    Several concrete measures have been initiated in Italy for the generation of nuclear power on a substantial scale. Two plants are already under construction and work will start soon on a third. Plans have also been announced for more stations. If the work already initiated is completed on schedule the installed capacity of nuclear power in Italy is likely to exceed 500 mw (electric) in the course of the next four years. This will constitute a sizeable proportion of the total electrical capacity in the country. After the Italian National Committee for Nuclear Research (Comitato Nazionale per le Ricerche Nucleari) was reorganized late in 1956, it prepared what can be described as a nuclear five-year plan for Italy. The plan, designed to cover the period 1957-1962, includes detailed schemes for a comprehensive development of the peaceful uses of nuclear energy, including a programme for the generation of power. The Comitato Nazionale per le Ricerche Nucleari (CNRN) promotes and co-ordinates the various activities in the field, and within the framework of its general programme certain industrial groups in Italy have formulated specific projects for nuclear power. At a Geneva conference (1958) it was disclosed that several companies were planning to build nuclear power stations in Italy. (1) SELNI (Societa Elettronucleare Italiana), pertaining to the Edison-Volta group, which plans to build a pressurized water reactor. (2) So.R.I.N. (Societa Ricerche Impianti Nucleari), a company founded by the Fiat and Montecatini groups, which is constructing a research centre, with a swimming pool reactor, and various laboratories for chemistry, physics and metallurgy. This centre will also be used for the training of specialized personnel, in view of the company's programme which envisages two 150 mw (e) plants: one operating with enriched uranium, the other with natural uranium. Such a programme will become effective only when the cost of power produced by these plants may actually

  3. Electricity Self-Generation Costs for Industrial Companies in Cameroon

    Directory of Open Access Journals (Sweden)

    Diboma Benjamin Salomon

    2010-07-01

    Full Text Available Industrial production in developing countries (DC is frequently perturbed by electric energy supply difficulties. To overcome this problem, generators are used in self-generation of energy, but this leads to an increase of electricity-related expenses. This article assesses the impact of electricity self-generation on Cameroonian industrial companies. The model described in this article is based on data collected through a survey of a representative sample of industrial companies and from numerous previous thematic and statistical studies. The results of our analyses show that expenses related to electricity in industrial companies in Cameroon have increased five times due to electricity rationing and untimely power cuts. The article also suggests some solutions to improve the electricity self-generation capacity of industrial companies.

  4. Innovation in electric power technologies in 2009

    International Nuclear Information System (INIS)

    Ohfusa, Takahiro; Hayasaka, Eiji; Ino, Hiroyuki

    2010-01-01

    This is a report of the title by Tokyo Electric Power Company, Kansai Electric Power Co., Inc, Tohoku Electric Power and other nine enterprises in Japan. The outline is as follows. Tokyo Electric Power Company stated pipe thinning by the hot water based two-phase flow testing device, development of technologies for corrosion protection of nuclear reactor using titanium oxide, evaluation of fatigue damage by EBSD, and study of duty on the nuclear power plant. Japan Atomic Power Company (JAPC) stated the mechanism of decrease in exposure dose of the primary coolant system by zinc infusion, outline of Air Operated Valve Intelligent Diagnostic Analysis System (AVIDAS) and the grand packing system, development of SAPLS, the automatic search program of fuel position for design of PWR related core, development of compact containment water reactor (CCR) and FBR cycle system, investigation of the chain destruction of active fault under consideration of dynamic interaction of active faults and decommissioning of Tokai Nuclear Power Plant. Electric Power Development Company reported construction of the Oma Nuclear Power Plant, a future nuclear plant in Oma, Aomori. The reactor will be capable of using 100% MOX fuel core (MOX-ABWR). The operation will start November 2014. (S.Y.)

  5. Predictive Power and Value Relevance of Comprehensive Income Statement: an analysis of Brazilian companies listed on the BM&FBovespa

    Directory of Open Access Journals (Sweden)

    Marcello Angotti

    2016-09-01

    Full Text Available The study aimed to analyze if the information about comprehensive income (CI and its individual components have predictive power to determine the Operating Cash Flow of the subsequent period (OCFt+1 at the Brazilian capital market companies. The research methodology has used financial data collected from Economatica® and CVM databases. The sample selection was performed considering the availability of variables: OCFt+1 and share prices. The period analyzed comprehended the years 2012-2014. It were used quantitative valuation techniques, establishing two moments of study: the first moment by testing the hypothesis that CI has greater predictive power than Net Income (NI for forecasting OCFt+1 (528 firms/years; and the second moment by testing the hypothesis that CI and its components have a value relevance at the Brazilian capital market (605 firms/years. The results suggest that the analysis of the consolidated CI individually would not be incremental for forecasting OCFt+1. However, an increase was observed in the predictive capacity for OCFt+1, with the inclusion of Other Comprehensive Income (OCI. Could not be verified, with aggregate disruption of the individual items of OCI, incremental capacity to determine the OCFt+1. It was observed that the Equity and NI have value relevance, but that is not confirmed to consolidated CI. Added to that, only the cash flow hedge was significant to explain the market value of the company, indicating there is informational benefit to stakeholders that employ the CI in their analysis.

  6. Powering Profits. Profits, Investments and Fuel Type Mixes in the Dutch Power Sector

    International Nuclear Information System (INIS)

    Wilde-Ramsing, J.; Steinweg, T.

    2007-06-01

    This report addresses the Dutch power sector, identifying the major corporate players in the market, types of fuel used to generate electricity, the profits being made, and investments in both renewable and non-renewable generation capacity. For the purposes of this report, the power sector is understood to encompass production (i.e. generation) and supply of electricity. Some discussion and figures on heat and gas, which are also essential energy services, are provided, but the focus is primarily on electricity. Section 2 of the report provides an overview of the Dutch power sector, breaking the market down into production and supply. Major players, markets shares, and recent trends and developments are given for each of these activities. Sections 3 - 7 go into detail on the five major corporate players active in the Dutch power sector: ENECO, Essent, Nuon, Electrabel, and E.ON Energie. For each company, information is provided on profits and earnings, the fuel mix used to generate and supply electricity, the CO2 emissions associated with these activities, installed capacity in the Netherlands, and recent investments in renewable and non-renewable generation capacity in the Netherlands. For the Dutch companies, ENECO, Essent and Nuon, additional information on the ownership structure of the company, shareholders and dividends paid and received is given. A section on RWE (Section 8) is also included in the study because, although RWE is not currently active in generating electricity in the Netherlands, RWE Energy does currently supply electricity generated by producers in the Netherlands. In addition, RWE Power is currently planning to invest significantly in power generation capacity in the Netherlands. The final section of the report compares the companies activities in the Netherlands and draws conclusions based on the companies' respective performance

  7. Installation modification of the reactor No.2 of Ikata nuclear power plant of Shikoku Electric Power Company, Inc

    International Nuclear Information System (INIS)

    1980-01-01

    The application was made on August 25, 1979, from the president of the Shikoku Electric Power Company, Inc., to the Minister of International Trade and Industry, relating to the installation modification of the reactor No. 2 in the Ikata nuclear power plant. The inquiry was submitted on September 28, 1979, from the Minister of International Trade and Industry to the Nuclear Safety Commission, after the safety evaluation in the Ministry of International Trade and Industry, and the investigation and deliberation were started on October 1, 1979, in the Nuclear Safety Commission. The content of the modification is to add the circuit actuated by the abnormal low pressure signal of the reactor to the actuating circuit of the emergency core cooling system (ECCS) and to increase the new fuel storage capacity from about 1/3 core to about 2/3 core. The additional signal circuit is composed of the logic circuit of ''2 out of 4'' and is multichannel design. The circuit is independent from the reactor control system and the conventional signal circuit of the concurrence of low pressure in the reactor and low level in the pressurizer. With the addition of the circuit of abnormal low pressure signal of the reactor, the countermeasures for preventing ECCS start by mistake are also added. These modifications give no influence to the functions of the reactor control system and reactor protection system. The function and the performance of ECCS were analyzed and evaluated accompanying these modifications assuming the loss of coolant accident. Concerning the new fuel storage capacity, the type of racks is modified from angle type to can type, and the subcriticality is kept even at the time of water flood. (Nakai, Y.)

  8. Power engineering constructions

    International Nuclear Information System (INIS)

    Chalus, Z.; Misterka, V.; Horak, P.

    1991-01-01

    Methods and applications of the design procedure, looked upon as a manifestation of management skills, are described on examples of the Finnish and French state power companies IVO and EdF, respectively. For understanding the activities at IVO, facts concerning the development of the organization structure of this joint-stock company and its rules as well as basic data of the Finnish power industry are given. The IVOSTUDY program package used for decision-making in the field of capital investments is described, as are the information systems employed by the managements of IVO and EdF. The management program systems ARTEMIS, BASIS, AFORA PMS and APROS are also discussed and experience from their use by the two companies is summarized. (J.P.)

  9. Ethics on the TEPCO bankruptcy, nuclear power plants and regulatory reform in the electric power industry

    International Nuclear Information System (INIS)

    Koga, Shigeaki

    2013-01-01

    Although regulatory reform in the electric power industry had been considered as part of social system reform like in the finance and communications to liberalize the market, there still continued to exist regional monopoly, integrated system for power generation, transmission and distribution, and lack of competition. The Fukushima accident showed such electric power system was unethical as social system compared to ordinary industries, because electric power company getting profit could not be prepared for nuclear damage liability and would burden third unrelated parties with risk. Electric power company should be forced to insure nuclear power plants for nuclear accidents. Otherwise restart of nuclear power plant operation should not be allowed. Nuclear power had been justified to be entitled grant or subsidy from the government for public good, which would be unfair to people. This article presented speeding-up scheme of Fukushima accident treatment leading to TEPCO bankruptcy and discussed measures against concerns or comments about bankruptcy procedures, major part of which might be mitigation of fund-raising fear by government support. At the proceeding of bankruptcy procedure including spinning off of separate companies, regulatory reform in the electric power industry could be taken in advanced. (T. Tanaka)

  10. Interaction in the large energetics companies in the Republic of Macedonia (Part 3)

    International Nuclear Information System (INIS)

    Janevski, Risto

    2000-01-01

    After the disintegration of former power energetic system of Yugoslavia 1991, the Republic of Macedonia has faced enormous problems in the energetic field. It was necessary to realize all options in order to secure enough electric power for normal economic capacities function. In that course a direct involvement of five large companies, which represent very significant energetic subjects, will largely determine the future energetic conditions and circumstances in our country. These are the following companies: P.E. Electric Power Co. of Macedonia; Heat Power Co.; HEK Jugohrom; Fenimak. In this paper the energetic system of the OKTA Crude Oil Refinery from 1991-1998 is analyzed, as well as its characteristics and plans for the future development

  11. Preparing Canada`s power systems for transition to the Year 2000: Y2K readiness assessment results for Canadian electric utility companies: second quarter 1999

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-08-25

    The report describes the state of readiness of Canadian electric utility companies with respect to the Year 2000 computer challenge. It complements the North American Electric Reliability Council Report entitled `Preparing the Electric Power Systems of North America for Transition to the Year 2000: A Status and Work Plan.` Two surveys were employed to gather information for this report. The first, a detailed survey prepared by NERC, was forwarded to all major electric utilities that comprise the Bulk Electricity System in North America. CEA has removed the Canadian findings from the overall North American results, and has presented those findings in this report. The second was a shorter, more simplified study, conducted by CEA and Natural Resources Canada. Whereas small companies involved only in the distribution aspect of the electricity business were not asked to complete the NERC assessment, all Canadian electric utility companies were part of the shorter survey. Chapter 2 covers specifically the readiness status and project management for non-nuclear generation, nuclear generation, energy management systems, telecommunications systems, substation controls, system protection and distribution systems, business information systems, and small distribution companies.

  12. Finland's leading natural gas company

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    The ownership structure of Finland's leading natural gas company, Gasum, changed fundamentally in 1999, and the company is now no longer a subsidiary of Fortum Corporation. 'Our new strong and broad ownership base will enable us to develop the natural gas business and pipeline network in Finland in response to the requirements of our Finnish customers', says Antero Jaennes, Gasum's Chairman and CEO, who stresses that Gasum is committed to remaining the leading developer of the Finnish natural gas market and the number-one gas supplier. Natural gas usage in Finland in 1999 totalled 3.9 billion m 3 (38.7 TWh), unchanged from 1998. Natural gas accounted for 11% of Finland's total primary energy need, as it did in 1998. The proportion of natural gas used in district heating rose by 2% to 36%, and moved down 2% in power generation to 10%. Industry's use of natural gas fell 1% to 17%. 75% of natural gas was used in combined heat and power (CHP) generation in industry and district heating. In 2000, Gasum expects to sell 4 billion m 3 of natural gas (40 TWh)

  13. 18 CFR 366.7 - Procedures for obtaining exempt wholesale generator and foreign utility company status.

    Science.gov (United States)

    2010-04-01

    ... definition of exempt wholesale generator or foreign utility company (including stating the location of its... obtaining exempt wholesale generator and foreign utility company status. 366.7 Section 366.7 Conservation of... THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT BOOKS AND...

  14. Hydroelectric power plants may influence profit of company

    International Nuclear Information System (INIS)

    Regula, E.

    2006-01-01

    In this interview with divisional manager of the Division of control of operation of hydroelectric power plants of the Slovenske elektrarne, a.s. Mr. Milan Chudy is published. The effectiveness and its optimisation in hydroelectric power plants of the Slovenske elektrarne, a.s. are discussed

  15. Probabilistic safety criteria for improvement of Nuclear Power Plant design and operation

    Energy Technology Data Exchange (ETDEWEB)

    Cho, Nam Jin; Chung, Woo Sick; Park, Moon Kyu [Korea Advanced Institute of Science and Technology, Taejon (Korea, Republic of)

    1991-12-15

    The procedure of this study is to : research on the status of IAEA(International Atomic Energy Agency) member states about the policy of safety goals, study figures of merit and demerit that inherently exist in the existing methodology for reliability allocation, develop an efficient methodology for allocating reliability from top-level safety goals to intermediate and low-level PSC, write a computer code on the basis of the methodology proposed in the study, and apply the methodology to Surry Unit 1 that is the type of PWR.

  16. Why the oil companies lost solar

    International Nuclear Information System (INIS)

    Miller, Damian

    2013-01-01

    Solar energy is a growing source of electricity supply. Oil companies including BP and Shell recognized this early on and entered the solar industry when it was still in its relative infancy. These companies invested heavily in vertically integrated solar companies that were at one point among the largest in the world. But neither BP nor Shell was successful, and they both decided to exit the solar market. This stands as a paradox since such companies have the funds, the long-term perspectives, the management systems, the multinational presence and the lobbying clout to potentially succeed in this new energy industry. Why were they not successful, and why did they ultimately exit? This paper uses innovation theory to explore the reasons why large incumbent corporations typically fail to succeed in commercializing disruptive innovations at scale. Evidence from semi-structured interviews and discussions with former employees of BP Solar and Shell Solar confirm the explanatory power of key constructs from innovation theory in accounting for the big oil companies' experience with solar technology. Ultimately, the findings suggest that oil companies would have done better to treat their solar businesses as separate stand-alone entities. - Highlights: • This paper examines why BP and Shell were not successful in solar, and exited. • It finds innovation theory to be very helpful in answering the question. • The evidence from semi-structured interviews, press reports, and archival documentation is in line with innovation theory. • Both the theory and the findings offer a different way forward for future oil and gas entrants

  17. Perceptions of content marketing : case study on Finnish companies

    OpenAIRE

    Hänninen, Heli

    2015-01-01

    The discipline of marketing has gone through some major changes over the past couple of decades. The power is moving away from companies to consumers, who are playing a more significant role than ever before. Furthermore, the increasing number of marketing channels and the digitalization of media create not only challenges but also opportunities for companies. These shifts in the environment have actually made content marketing to be one of the most popular concepts in marketing today. Conte...

  18. 75 FR 42432 - Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC...

    Science.gov (United States)

    2010-07-21

    ... Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC, Transcontinental... abandonment of facilities by Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas... resources, fisheries, and wetlands; Cultural resources; Vegetation and wildlife; Endangered and threatened...

  19. Spontaneous centralization of control in a network of company ownerships.

    Directory of Open Access Journals (Sweden)

    Sebastian M Krause

    Full Text Available We introduce a model for the adaptive evolution of a network of company ownerships. In a recent work it has been shown that the empirical global network of corporate control is marked by a central, tightly connected "core" made of a small number of large companies which control a significant part of the global economy. Here we show how a simple, adaptive "rich get richer" dynamics can account for this characteristic, which incorporates the increased buying power of more influential companies, and in turn results in even higher control. We conclude that this kind of centralized structure can emerge without it being an explicit goal of these companies, or as a result of a well-organized strategy.

  20. Evaluation of web sites of accommodation companies

    OpenAIRE

    Çubukcu, Muhammed İhsan

    2010-01-01

    OBJECTIVE: In a situation in which present economy is called as a digital economy, all organizations have to make up their informatics infrastructures. The societies that can use and share the information by using the technology as it requires will be societies that have the power of competition; and the power of competition will just be measured by the ability of reaching the information. This applicational study includes the analysis of the web pages of the five star accommodation companies...

  1. Sustainability in the Power Sector. 2010 Update. Europe

    Energy Technology Data Exchange (ETDEWEB)

    Steinweg, T.; Ten Kate, A.; Racz, K.

    2010-11-15

    This 2010 series of power company and thematic fact sheets aims to raise public awareness about sustainability issues in the electricity sector and to improve the sustainability of power companies operating in the Netherlands. The fact sheet series investigates the companies' performance on incorporating renewable energy sources into their fuel mix for both generation and supply of electricity, and on their investments and future plans with respect to energy sources at both the Dutch and European level. The 2010 fact sheet series is the annual update that is going into its fourth year, and builds on the work from previous years (available at www.somo.nl), but includes a slightly different range of companies due to a number of recent and pending mergers and acquisitions among power companies with operations in the Netherlands. For the first time this year, Essent is fully incorporated in the RWE company profile. SPE, a company covered for the first time, is included in the company profile of its owner EdF. The Vattenfall and Nuon fact sheets were drafted and reviewed separately, and combined into one company profile afterwards. In total, the 2010 series consist of ten company fact sheets; Delta, Dong Energy, E.ON, EdF, SPE, Eneco, Enel, Gdf Suez/Electrabel, Iberdrola, Nuon/Vattenfall and RWE. The company fact sheets form the basis of three separate reports, covering companies active in (1) The Netherlands, (2) Belgium, and an overview of (3) the largest European companies. This report is the version for Europe, and covers the following companies, all among the largest electricity companies in Europe: EdF, Enel, E.ON, GDF Suez/Electrabel, Iberdrola, RWE, Vattenfall/Nuon.

  2. Research on service strategy of electricity selling company under the reform of electricity market

    Science.gov (United States)

    Long, Zhuhan; Meng, Shiyu; Dou, Jinyue; Zeng, Ming; Sun, Chenjun

    2017-10-01

    The opening of the sale side of electricity market is an important goal of the new round of power system reform in China, and it is necessary to speed up the establishment and development of the electricity selling companies to achieve this goal. First of all, this paper defines the key problems, which are needed to be solved in the establishment of the sale side market, such as demand side response, optimization of users' power consumption mode, profit mode of electricity selling companies and fair competition in the market. On this basis, this paper analyzes the business of electricity selling company, from the aspects of the transition of business ideas, improving the energy efficiency level, providing integrated energy solutions and innovating business management mode; and then, the service strategies of electricity selling companies are put forward.

  3. Minnesota Power Settlement

    Science.gov (United States)

    EPA and DOJ announced a Clean Air Act settlement with Minnesota Power, an ALLETE company based in Duluth, that will cover its three coal-fired power plants and one biomass-and-coal-fired steam and electricity cogeneration plan

  4. 18 CFR 366.23 - FERC Form No. 60, Annual reports of centralized service companies, and FERC-61, Narrative...

    Science.gov (United States)

    2010-04-01

    ... POWER ACT AND NATURAL GAS ACT BOOKS AND RECORDS Accounting and Recordkeeping Under PUHCA 2005, the... functions. 366.23 Section 366.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... companies, and FERC-61, Narrative description of service company functions. (a) General. (1) FERC Form No...

  5. The UK nuclear power industry

    International Nuclear Information System (INIS)

    Collier, J. G.

    1995-01-01

    In the United Kingdom, nuclear power plants are operated by three companies: Nuclear Electric (NE), Scottish Nuclear (SN), and British Nuclear Fuels plc (BNFL). The state-operated power industry was privatized in 1989 with the exception of nuclear power generation activities, which were made part of the newly founded (state-owned) NE and SN. At the same time, a moratorium on the construction of new nuclear power plants was agreed. Only Sizewell B, the first plant in the UK to be equipped with a pressurized water reactor, was to be completed. That unit was first synchronized with the power grid on February 14, 1995. Another decision in 1989 provided for a review to be conducted in 1994 of the future of the peaceful uses of nuclear power in the country. The results of the review were presented by the government in a white paper on May 9, 1995. Accordingly, NE and SN will be merged and privatized in 1996; the headquarters of the new holding company will be in Scotland. The review does not foresee the construction of more nuclear power plants. However, NE hopes to gain a competitive edge over other sources of primary energy as a result of this privatization, and advocates construction of a dual-unit plant identical with Sizewell B so as to avoid recurrent design and development costs. Outside the UK, the company plans to act jointly with the reactor vendor, Westinghouse, especially in the Pacific region; a bid submitted by the consortium has been shortisted by the future operator of the Lungmen nuclear power plant project in Taiwan. In upgrading the safety of nuclear power plants in Eastern Europe, the new company will be able to work through existing contacts of SN. (orig.) [de

  6. Trends on nuclear power generation and industry in European and American nations

    International Nuclear Information System (INIS)

    Tokai, Kunihiro

    2001-01-01

    In European and American nations, competitive principle was also recently introduced to electric industry allowed its local exclusion as a public business before today by liberalization of electric power market due to regulative relaxation, and then the existing electric power companies are now under serious competition with the other companies, of course with IPP which is its new comer. And, as nuclear power generation has already established there its position for an important source essential for electric power supply, by liberalization of electric power economy has also been severely required to the nuclear power generation. Then, the electric power companies intend to carry out cost-down by various means such as contraction of periodical inspection, and so on. Especially, in U.S.A., not only rationalization effort at a pace of every company but also various cost-down procedures ranging to reorganization of business such as purchase of other company power station, establishment of operation company integrally carrying out operation management of some companies, and so on, As a result, the nuclear power generation has come to obtain an evaluation to be an electric source sufficiently capable of competing with the other sources even at competitive market. On the other hand, its new construction continues at difficult condition. By adding to traditional objection against nuclear energy, in general, by recently entering of environmental protection party to the regime in some nations of western Europe, political environment around nuclear energy becomes unstable. And, liberalization of electric power also forms an investment environment advantageous for natural gas burning thermal power plants capable of carrying out short term capital recovery, in general. Therefore, the electric companies tend strongly to correspond to rather life elongation of the present plant than new plan construction. (G.K.)

  7. A preliminary study on financial risk management of the uranium enrichment company, given China's fast development of nuclear power industry

    International Nuclear Information System (INIS)

    Sun Wumei

    2010-01-01

    In market economy, control and prevention of financial risk is a factual and urgent issue of financial management. As an independent legal identity, the enterprise strives to achieve business operations and developments while bearing risks. In an era of fast growth of China's nuclear power industry, uncertainties facing uranium enrichment companies are inevitable. Without being aware of financial risks, the enterprise could be driven to hopeless situation when catastrophe comes. Recognizing financial risk factors, knowing the cause and effect of risk events, building a mechanism to prevent and control financial risks, are the right approaches for building a robust enterprise. (author)

  8. 75 FR 13524 - Northern Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC...

    Science.gov (United States)

    2010-03-22

    ... Natural Gas Company, Southern Natural Gas Company, Florida Gas Transmission Company, LLC, Transcontinental... notice that on March 5, 2010, Northern Natural Gas Company (Northern Natural), 1111 South 103rd Street, Omaha, Nebraska 68124- 1000, filed on behalf of itself and other owners, Southern Natural Gas Company...

  9. Sustainability in the Power Sector. 2010 Update. The Netherlands

    Energy Technology Data Exchange (ETDEWEB)

    Steinweg, T.; Ten Kate, A.; Racz, K.

    2010-11-15

    This 2010 series of power company and thematic fact sheets aims to raise public awareness about sustainability issues in the electricity sector and to improve the sustainability of power companies operating in the Netherlands. The fact sheet series investigates the companies' performance on incorporating renewable energy sources into their fuel mix for both generation and supply of electricity, and on their investments and future plans with respect to energy sources at both the Dutch and European level. The 2010 fact sheet series is the annual update that is going into its fourth year, and builds on the work from previous years (available at www.somo.nl), but includes a slightly different range of companies due to a number of recent and pending mergers and acquisitions among power companies with operations in the Netherlands.

  10. NE seeks to sell power directly to customers

    International Nuclear Information System (INIS)

    Anon.

    1993-01-01

    Nuclear Electric, the state-owned company that operates nuclear power stations in England and Wales, has applied to compete directly with privatized electricity generating companies in the sale of electricity to major customers. Since its formation in 1990, NE has had to sell all of its electrical output through the so-called pool operated by the National Grid Company, and then to 12 regional distribution companies that have franchises for about 75 percent of electricity consumption in their regions. On the other hand, the two large companies that took over the fossil-fuel power stations at the time of privatization, and other new independent companies that are building combined-cycle gas-turbine plants, are allowed to conclude supply contracts directly with large industrial customers

  11. Sustainability in the Power Sector. 2010 Update. Belgium

    Energy Technology Data Exchange (ETDEWEB)

    Steinweg, T.; Ten Kate, A.; Racz, K.

    2010-11-15

    This 2010 series of power company and thematic fact sheets aims to raise public awareness about sustainability issues in the electricity sector and to improve the sustainability of power companies operating in the Netherlands. The fact sheet series investigates the companies' performance on incorporating renewable energy sources into their fuel mix for both generation and supply of electricity, and on their investments and future plans with respect to energy sources at both the Dutch and European level. The 2010 fact sheet series is the annual update that is going into its fourth year, and builds on the work from previous years (available at www.somo.nl), but includes a slightly different range of companies due to a number of recent and pending mergers and acquisitions among power companies with operations in the Netherlands. For the first time this year, Essent is fully incorporated in the RWE company profile. SPE, a company covered for the first time, is included in the company profile of its owner EdF. The Vattenfall and Nuon fact sheets were drafted and reviewed separately, and combined into one company profile afterwards. In total, the 2010 series consist of ten company fact sheets; Delta, Dong Energy, E.ON, EdF, SPE, Eneco, Enel, Gdf Suez/Electrabel, Iberdrola, Nuon/Vattenfall and RWE. The company fact sheets form the basis of three separate reports, covering companies active in (1) The Netherlands, (2) Belgium, and an overview of (3) the largest European companies. This report is the version for Belgium, and covers the following companies, all active on the Belgian market: EdF, GDF Suez/Electrabel, RWE, SPE, Vattenfall/Nuon.

  12. Organizational structure of power engineering of Kazakhstan. Chapter 4

    International Nuclear Information System (INIS)

    1998-01-01

    Pathways of integration in Kazakhstan power engineering are considered and economic structure formation in the branch is revealed as well. In 1994 privatization plan for power engineering branch was accepted. All state enterprises were reorganize in to joint-stock companies. At that there is single state monopoly company - National Power System (NPS) Kazakhstanehnergo. NPS makes a wholesale market of electric energy at the expense of it generation at base power plants, additional purchase abroad, following transport in all regions and its selling to territorial power companies as well as separate buyers. Last time wide application of commercial principles in state sector is observed. For formation of wholesale and retail markets was organized Kazakhstan EnergoPool

  13. A company-wide activity to grow safety culture in a maintenance department of nuclear power plant

    International Nuclear Information System (INIS)

    Fukui, Hirokazu; Sugiman, Toshio

    2008-01-01

    This study aims to conduct a field survey to collect specific instances of 'learning activity' that would help develop a safety culture in a maintenance department of nuclear power plant, with 'activity theory' as a theoretical base, and to derive a conceptual model that portrays these instances as part of comprehensive organizational activities. First, the field survey found instances where an accident that occurred a few years ago provided momentum; a company-wide activity is being implemented in order to fulfill the requests of field workers so that their requests for improvements are positively honored and budgets are allocated to measures designed to accommodate these requests. This paper calls this company-wide activity 'an activity to materialize the requests for improvements in the workplace' and considers it to be a typical instance of learning activity. Second, the field survey found that, in the workplace under discussion, a daily meeting was held in a unique way and a study session was conducted frequently and regularly. Last, we came up with a conceptual model for the entire aspect of organizational activities in which we could position the above instances as well as the results of our past field surveys. This model conceptualizes organizational activities from the two aspects of 'learning activity (primary learning activity)' and 'management activity) and characterizes an activity that would transform the existing organizational activities into ones that could not be even predicted as 'secondary learning activity'. 'An activity to materialize the requests for improvement in the workplace' was taken as falling under the category of secondary learning activity. (author)

  14. New Danish Company Act on Shareholders' Agreements

    DEFF Research Database (Denmark)

    Werlauff, Erik

    2011-01-01

    ) organizational rights, (2) financial rights, and (3) rights of disposal, or in plainer words, the corporate (1) power, (2) money, and (3) exit. If a shareholders’ agreement is thoroughly kept and respected by all parties, both in the way they vote at general assemblies and in the way they act when wishing....... The substantial elements in many agreements are clauses on (1) voting for board candidates, (2) voting for dividends of certain proportions, and (3) first refusal rights, respectively, call options for shares in the company. Such clauses are at the very roots of corporate law, dealing with the shareholders’ (1......Section 82 of the Danish Company Act, in force from 1 March 2010, provides that ‘Shareholders’ agreements are neither binding on the company nor on decisions taken by the general assembly’. This has far-reaching consequences for shareholders’ agreements, also for already existing agreements...

  15. DESIGN OF EXPERIMENTS IN TRUCK COMPANY

    Directory of Open Access Journals (Sweden)

    Bibiana Kaselyova

    2015-07-01

    Full Text Available Purpose: Design of experiment (DOE represent very powerful tool for process improvement vastly supported by six sigma methodology. This approach is mostly used by large and manufacturing orientated companies. Presented research is focused on use of DOE in truck company, which is medium size and service orientated. Such study has several purposes. Firstly, detailed description of improvement effort based on DOE can be used as a methodological framework for companies similar to researched one. Secondly, it provides example of successfully implemented low cost design of experiment practise. Moreover, performed experiment identifies key factors, which influence the lifetime of truck tyres.Design/methodology: The research in this paper is based on experiment conducted in Slovakian Truck Company. It provides detailed case study of whole improvement effort, together with problem formulation, design creation and analysis, as well as the results interpretation. The company wants to improve lifetime of the truck tyres. Next to fuel consumption, consumption of tyres and their replacement represent according to them, one of most costly processes in company. Improvement effort was made through the use of PDCA cycle. It start with analysis of current state of tyres consumption. The variability of tyres consumption based on years and types was investigated. Then the causes of tyres replacement were identified and screening DOE was conducted. After a screening design, the full factorial design of experiment was used to identify main drivers of tyres deterioration and breakdowns. Based on result of DOE, the corrective action were propose and implement.Findings: Based on performed experiment our research describes process of tyres use and replacement. It defines main reasons for tyre breakdown and identify main drivers which influence truck tyres lifetime. Moreover it formulates corrective action to prolong tyres lifetime.Originality: The study represents full

  16. Environmental Assessment for Central Power and Light Company`s proposed Military Highway-CFE tie 138/69-kV transmission line project Brownsville, Cameron County, Texas

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    Central Power and Light Company (CPL) intends to upgrade its existing transmission line ties with the Commision Federal de Electricidad (CFE) system in Mexico. CPL currently has a single 69-kilovolt (kV) transmission line in the Brownsville area which connects CPL`s system with the system of CFE. This existing line runs between the Brownsville Switching Station, located on Laredo Road in Brownsville, Cameron County, Texas, and an existing CFE 69-kV line at the Rusteberg Bend of the Rio Grande in Cameron County. Under current conditions of need, the existing 69-kV line does not possess sufficient capability to engage in appropriate power exchanges. Therefore, CPL is proposing to build a new line to link up with CFE. This proposed line would be a double-circuit line, which would (1) continue (on a slightly relocated route) the existing 69-kV tie from CPL`s Brownsville Switching Station to CFE`s facilities, and (2) add a 138-kV tie from the Military Highway Substation, located on Military Highway (US Highway 281), to CFE`s facilities. The proposed 138/69-kV line, which will be constructed and operated by CPL, will be built primarily on steel single-pole structures within an average 60-foot (ft) wide right-of-way (ROW). It will be approximately 6900--9200 ft (1.3--1.7 miles) in length, depending on the alternative route constructed.

  17. A briefing paper for the status of the flue gas desulfurization system at Indianapolis Power ampersand Light Company Petersburg Station Units 1 and 2

    International Nuclear Information System (INIS)

    Rutledge, C.K.; Wolsiffer, S.R.; Gray, S.M.; Martin, J.E.; Wedig, C.P.

    1992-01-01

    This paper presents a brief description of the status of the retrofit wet limestone flue gas desulfurization system project at Indianapolis Power ampersand Light Company (IPL) Petersburg Units 1 and 2. This project was initiated by IPL in response to the Clean Air Act of 1990 and is intended to treat the flue gas from two base load units with a combined capacity of approximately 700 MW gross electrical output

  18. History of electric power technological innovation in 2017

    International Nuclear Information System (INIS)

    Yamaguchi, Hiroshi; Okabe, Kazuhiko; Ichimura, Yasunori

    2017-01-01

    This is an overview of the electric power technology innovation of 12 electric power companies in 2016. Among them, this paper outlines the technological contents related to nuclear power of three major companies. TEPCO group applied a sealant from the outside to the back-up seal of reactor containment vessel that had deteriorated. It developed a good sealing system by combining with an improved sealant, and confirmed the effect at an experimental level. Regarding environmental restoration in Fukushima, TEPCO developed a personal dosimetry technology, environmental monitoring technology, and a technology to simulate radiation reduction amount after decontamination. Chubu Electric Power Company conducted researches on the applicability of the start-up range neutron monitor count rate prediction method related to fuel loading after a long-term shut-down of nuclear power generation, basic examination for practical use of laser decontamination, and possibility of tsunami prediction using satellite positioning information. With regard to the decommissioning measures of nuclear power plants, Japan Nuclear Power Electric Generation Co., Ltd. conducted studies on the decommissioning work of the Tokai Power Station, the safe dismantling method of the Tsuruga Power Station Unit 1 as decommissioning measures and fuel management, and the disposal method of radioactive contaminants. In the development of future reactor, this company conducted research on the development of fast breeder reactor system, etc. (A.O.)

  19. SAFER - Company Snapshot - SAFER - Company Snapshot

    Data.gov (United States)

    Department of Transportation — The Company Snapshot is a concise electronic record of company identification, size, commodity information, and safety record, including the safety rating (if any),...

  20. Compliance and data privacy of employees in power supply companies - a tightrope walk. Part 2.; Ein schmaler Grat. Compliance und Beschaeftigtendatenschutz in Energieversorgungsunternehmen. T. 3

    Energy Technology Data Exchange (ETDEWEB)

    Schaefer, Ralf; Soetebeer, Joerg B. [Sozietaet Becker Buettner Held, Berlin (Germany); Holzinger, Sebastian [KoM-SOLUTION GmbH, Berlin (Germany)

    2012-05-15

    Employee surveillance measures are an indispensable part of effectively ensuring compliance and preventing harm to the business in the day-to-day operations of power supply companies. Beside bag searching and door control surveillance measures are focused above all on data screening and monitoring employees' electronic and/or private communication. Part one of this two-part series (''et'' 4/2012, p. 88 ff.) related background information on the amending draft to the German Federal Law on Data Privacy and inquired in detail into the content of the provisions of draft articles 32, 32a and 32b on the collection, processing and utilisation of personal data prior to the conclusion of an employment contract and their impact on day-to-day operations in power supply companies. Part two now focuses on the planned regulatory framework for data privacy during the period of employment. The intent of paragraph paragraph 32c ff. of the draft amendment is to more clearly delineate and specify the legal boundaries for the above-named measures where they fall within the scope of data privacy legislation and thus improve legal certainty in this area in the future.

  1. A Game Theoretical Approach Based Bidding Strategy Optimization for Power Producers in Power Markets with Renewable Electricity

    Directory of Open Access Journals (Sweden)

    Yi Tang

    2017-05-01

    Full Text Available In a competitive electricity market with substantial involvement of renewable electricity, maximizing profits by optimizing bidding strategies is crucial to different power producers including conventional power plants and renewable ones. This paper proposes a game-theoretic bidding optimization method based on bi-level programming, where power producers are at the upper level and utility companies are at the lower level. The competition among the multiple power producers is formulated as a non-cooperative game in which bidding curves are their strategies, while uniform clearing pricing is considered for utility companies represented by an independent system operator. Consequently, based on the formulated game model, the bidding strategies for power producers are optimized for the day-ahead market and the intraday market with considering the properties of renewable energy; and the clearing pricing for the utility companies, with respect to the power quantity from different power producers, is optimized simultaneously. Furthermore, a distributed algorithm is provided to search the solution of the generalized Nash equilibrium. Finally, simulation results were performed and discussed to verify the feasibility and effectiveness of the proposed non-cooperative game-based bi-level optimization approach.

  2. New Brunswick Power Nuclear Corporation update 2005

    International Nuclear Information System (INIS)

    White, R.M.; Eagles, E.R.; Pilkington, W.S.

    2005-01-01

    A brief presentation will be made on the operations and business activities over the previous year with a discussion of the current status of the NB Power group of companies. The New Brunswick Government has implemented the new 'Electricity Act' which has resulted restructuring of NB Power, opening of the electricity market to wholesale completion and the separation of the transmission system operation from NB Power. On October 1, 2005 the restructuring of NB Power was implemented to change NB Power from a single integrated utility into NB Power Holding Corporation with four subsidiary operating companies including NB Power Nuclear Corporation, NB Power Distribution and Customer Service Corporation, NB Power Transmission Corporation and NB Power Generation Corporation. As part of the Electricity Act, the transmission system reliability, operation and market control functions have been moved into a separate company, the NB System Operator, outside of the NB Power group of companies. A review of Point Lepreau's operational activities will include presentation of the capacity factor, availability and safety results with a summary of significant issues, planned outages and unplanned outages. An update on the current status of Power Reactor Operating License renewal and the strategies for renewal timing will be presented. Planning for refurbishment has continued with a major focus on addressing the recommendations made by Dr. Robin Jeffrey in his report to the Province of New Brunswick. These recommendations included three options for replacement of the Point Lepreau capacity and energy; 1) improve refurbishment contract arrangements with AECL, 2) solicit external investment in refurbishment and the station and 3) update the case for fossil fuel alternatives. The NB Power Holding Corporation Board of Directors have provided the appropriate information on the options to the owner (Province of New Brunswick) for consideration. A decision on the future of the Point Lepreau

  3. The independent power production and the reorganization of the electric power sector

    International Nuclear Information System (INIS)

    1998-12-01

    The transformation of the electric power production and distribution sector is in progress thanks to the progressive opening of markets and to the emergence of a new kind of actor: the independent producer. After the USA, the UK, and most of the emerging countries, the continental Europe is actively preparing its mutation. The historical actors try to protect their positions on their own national markets and at the same time to develop their international position. The newcomers (oil companies, independent power producers, collective service companies) have adopted a radically offensive strategy based on an international development and a skimming of the market. This study takes stock of the degree of liberalization of the different markets and analyzes their structuring elements and dynamism. An analytical presentation of the main actors of the electric power market is performed in order to evaluate their forces and feeblenesses in front of this mutation. Finally, it tries to answer the following questions: which are the most promising zones for the newcomers, and which companies will win this new deal? (J.S.)

  4. The thinking of Cloud computing in the digital construction of the oil companies

    Science.gov (United States)

    CaoLei, Qizhilin; Dengsheng, Lei

    In order to speed up digital construction of the oil companies and enhance productivity and decision-support capabilities while avoiding the disadvantages from the waste of the original process of building digital and duplication of development and input. This paper presents a cloud-based models for the build in the digital construction of the oil companies that National oil companies though the private network will join the cloud data of the oil companies and service center equipment integrated into a whole cloud system, then according to the needs of various departments to prepare their own virtual service center, which can provide a strong service industry and computing power for the Oil companies.

  5. CALCULATING WATER CONSUMPTION AND WITHDRAWAL FROM POWER PLANTS GLOBALLYUsing machine learning, remote sensing and power plant data from the Power Watch platform

    Science.gov (United States)

    Kressig, A.

    2017-12-01

    BACKGROUND The Greenhouse Gas Protocol (GHGP), Scope 2 Guidance standardizes how companies measure greenhouse gas emissions from purchased or independently generated electricity (called "scope 2 emissions"). Additionally, the interlinkages between industrial or commercial (nonresidential) energy requirements and water demands have been studied extensively, mostly at the national or provincial scale, focused on industries involved in power generation. However there is little guidance available for companies to systematically and effectively quantify water withdrawals and consumption (herein referred to as "water demand") associated with purchased or acquired electricity(what we call "Scope 2 Water"). This lack of guidance on measuring a company's water demand from electricity use is due to a lack of data on average consumption and withdrawal rates of water associated with purchased electricity. OBJECTIVE There is growing demand from companies in the food, beverage, manufacturing, information communication and technology, and other sectors for a methodology to quantify Scope 2 water demands. By understanding Scope 2 water demands, companies could evaluate their exposure to water-related risks associated with purchased or acquired electricity, and quantify the water benefits of changing to less water-intensive sources of electricity and energy generation such as wind and solar. However, there has never been a way of quantifying Scope 2 Water consumption and withdrawals for a company across its international supply chain. Even with interest in understanding exposure to water related risk and measuring water use reductions, there has been no quantitative way of measuring this information. But WRI's Power Watch provides the necessary data to allow for the Scope 2 Water accounting, because it will provide water withdrawal and consumption rates associated with purchased electricity at the power plant level. By calculating the average consumption and withdrawal rates per

  6. Ownership relations and cooperation in the Norwegian power market

    International Nuclear Information System (INIS)

    Singh, Balbir; Skjeret, Frode

    2006-01-01

    The Norwegian Competition Authority (KT) under a grant from The Ministry for Government Administration and Reform (FAD) commissioned a study in December 2005 to outline the extent and nature of cooperation among the power production companies in the Norwegian Power market. The main objective of the study was to establish an updated data set that documents the status with respect to distribution of ownership of generation capacity, and to identify the main forms of cooperation and information exchange among the power generation companies in Norway. Both secondary and primary sources have been used in the study. Data related to the distribution of generation capacity is mainly based on secondary sources and covers the total population consisting of 622 power plants and 183 companies in the Norwegian power market. In addition, requests for information were sent to a sample of power companies to collect primary information that could shed light on the status, trend, motivations, behavioral constraints, and exchange of information associated with different forms of cooperation between the power producers. The complete data set and results are modeled in a spread sheet based database (OPS) that accompanies this report. This report summarizes the main findings of the study. The primary data collected from the power companies during the sample survey is not included in this report. Only the main conclusions drawn on the basis of the analysis of the information provided by the respondents are presented in this report. It is important to emphasize that this publication reports data and information as collected from the primary and secondary sources in this project. The material presented in this publication reports a summary of the collected information and is not meant to draw any conclusions about the existence or otherwise of any form of collusion among the responding companies (author) (ml)

  7. Implementation Of 5S Quality Tool In Manufacturing Company A Case Study

    Directory of Open Access Journals (Sweden)

    Vibhor Kakkar

    2015-02-01

    Full Text Available Abstract 5S system is a technique which maintains the quality of working conditions in the organization. Amongst various available Lean resources 5S is a powerful technique that can bolster objectives of the organization to get continuous improvement in performance and productivity. This paper presents the implementation of 5S in a manufacturing company amp 5S rating system was used to audit all changes in the company which enhanced the efficiency of the workers amp ultimately the productivity of the company is enhanced to 91 .

  8. MSR redesign and reconstruction at Indiana Michigan Power Company's Donald C. Cook Nuclear Power Plant, Unit 1

    International Nuclear Information System (INIS)

    Yarden, A.L.; Tam, C.W.; Benes, J.D.; Arnold, W.E.

    1993-01-01

    When Indiana Michigan Power Company's (I and M) 1089- MWe, PWR, Donald C. Cook Nuclear Plant, Unit 1, (Cook 1) in Bridgeman, Michigan went into commercial operation in late 1975, its turbine generator included two Moisture Separator Reheater (MSR) vessels. Each of these original MSRs contained, in addition to the moisture separation section, a single stage 2-pass reheater consisting of 5/8 inch O.D., finned CuNi tubes with main heating steam as an energy source. The enormous size of the tube bank, with a vertical orientation of its tubes' U-bends, led the designer to choose two separate headers for the inlet side and outlet side of the tube bank. Over the years, these 2-pass reheaters had deteriorated mechanically such that maintenance costs had increased considerably. Also, the MSR performance in terms of MWe gain, had fallen off as a result of a gradual reduction of both superheat and moisture separation efficiency. In 1990, these MSRs were totally reconstructed with inherently different 4-pass reheaters and upgraded moisture separation systems. The performance and other direct parameters of these newly retrofitted and improved MSRs have exceeded original design specifications, and their operational stability has improved markedly. This MSR reconstruction at Cook 1 is the first of its kind to include a 4-pass reheater in association with a nuclear turbine generator of this design. This paper highlights the problems and solutions associated respectively with the original reheaters in the Cook 1 MSRs and their recent redesign, reconstruction, and performance

  9. Participation of Employees in Company Management - Legal basis for its implementation in the Republic of Macedonia

    OpenAIRE

    Petkukjeski, Ljupco; Andonov, Marko; Mihajloski, Zoran; Miseva, Kristina

    2014-01-01

    The company represents a complex social organism which interests should be different from the interests of various interest groups within the company. Company employees as part of the social structure, have the right to participate in decisions relating to their position in the company and that affect their rights and interests. Participation of employees in management is democratic achievement which reduces inequality based on differences in economic strength and power. This approach allo...

  10. The power of British Energy

    International Nuclear Information System (INIS)

    Hawley, R.

    1997-01-01

    When the power industry in Britain was privatized, British Energy plc (BE), whose head office is in Edingburgh, Scotland, was founded in July 1996. It is the only power utility in the world exclusively operating nuclear power stations. Operative business has remained the responsibility of the two regional supply companies, Nuclear Electric (NE) and Scottish Nuclear (SN) which, in addition to the modern PWR nuclear generating unit of Sizewell B, have included in the new holding company their advanced gas-cooled and gas-moderated reactor (AGR) units. The older gas-graphite reactor (GGR) plants were combined in the new Magnox Electric plc, Berkeley; at some later date, this company is to be merged with another nuclear power plant operator, British Nuclear Fuels plc (BNFL). Sizewell B, which was commissioned in 1995, is the last nuclear generating unit to be started up in the United Kingdom, for the time being. In times of low raw material prices and the need for a quick return on invested capital, BE is reluctant to run the risk associated with tying up capital for a long time. Instead, the company has backfitted its plants so that the production of electricity from nuclear power in Britain in 1996 of 92,476 GWh was increased by almost 10% over the 1995 level of 84,174 GWh. In addition to modernization and rationalization at home, BE together with Sizewell B vendor Westinghouse is engaged worldwide in the development and commercialization of future advanced reactors. This ensures that the know-how accumulated will be preserved and will be available for new nuclear power plants to be built in Britain in the next century. (orig.)

  11. State plans to force companies to eliminate environmental burdens

    International Nuclear Information System (INIS)

    Marcan, P.

    2004-01-01

    The Ministry of Environment is preparing legislation aimed at forcing the state and especially private enterprises to map and eliminate tips, refuse from company premises and farmyards, and manure heaps. It is expected that the main burden will fall on private enterprises. The department is still working on the wording of this new Act on environmental burdens and so it is not yet clear whether it will be of assistance in the elimination of environmental burdens. The Ministry is aware that economic aspects must also be taken into account when exercising pressure on the companies. Closing down a company that cannot meet environmental criteria would result in redundancies and so the time schedule for the elimination of environmental burdens will be adjusted to fit the financial situation of the company involved. The ministry plans to first find companies responsible for environmental debts and then set a deadline for the preparation of a project to eliminate the environmental burden. The project would have to contain a description of elimination methods, in addition to a time schedule and cost assessment. If a private company does not report an environmental burden, the competent public authority will have the power to request access to the premises to undertake an inspection. (author)

  12. Greenfield nuclear power for Finland

    Energy Technology Data Exchange (ETDEWEB)

    Saarenpaa, Tapio

    2010-09-15

    In Finland, licensing for new nuclear power is ongoing. The political approval is to be completed in 2010. Fennovoima's project is unique in various ways: (i) the company was established only in 2007, (ii) its ownership includes a mixture of local energy companies, electricity-intensive industries and international nuclear competence through E.ON, and (iii) it has two alternative greenfield sites. There are five prerequisites for a successful nuclear power project in a transparent democracy of today: (1) need for additional power capacity, (2) actor prepared to invest, (3) established competence, (4) available site, (5) open communications, and (6) favorable public opinion.

  13. European coal technology applied by the Danish power companies

    Energy Technology Data Exchange (ETDEWEB)

    Frydenberg, B. [Elsamprojekt A/S, Fredericia (Denmark)

    1996-12-31

    The development of coal-fired power plants has shown remarkable improvements with regard to efficiency and cleaner technology, and as coal remains the most important fuel for electric power production, it is important to make use of this technological development to reduce CO{sub 2} emissions. Of the three available technologies: Integrated Coal Gasification and Combined Cycle, Fluid Bed Combustion and Pulverised Coal with Ultra Supercritical Steam Data, the technology chosen by I/S ELSAM is the PC-USC with power production efficiencies growing from 45% to 50%. 5 figs., 1 tab.

  14. IMPLEMENTATION OF QUALITATIVE RULES IN COMPANY`S INFORMATION MANAGEMENT

    Directory of Open Access Journals (Sweden)

    Anna WOLNOWSKA

    2012-07-01

    Full Text Available In the article there were presented chosen issues of quality management. Important role of information and work processes in companies were emphasized . Based on eight rules of quality management, TQM standards and ideas of discipline pioneers like Deming, Juran, Crosby and Shewart, author has constructed way of using chosen rules and assumptions to company`s information circulation. Analogy, suggested by author, has not only emphasized importance of information as a company`s resource, but also has pointed to possibility of improving ways of managing this information.

  15. Part I. Remembering No. 2 (Ladislav Loerinc). EMO joint venture, joint-stock company - really completely useless organ?

    International Nuclear Information System (INIS)

    Blaha, M.

    2008-01-01

    In this chapter author reviewed the story of the EMO joint venture, joint-stock company, between Slovenske elektrarne, a. s. and EdF. EMO joint venture, joint-stock company, was established to complete the Mochovce nuclear power plant. EMO joint venture, joint-stock company was closed after one year of work. History of EMO joint venture, joint-stock company, was described by its former general manager Mr. Ladislav Loerinc.

  16. Assessment and Improving Methods of Reliability Indices in Bakhtar Regional Electricity Company

    Directory of Open Access Journals (Sweden)

    Saeed Shahrezaei

    2013-04-01

    Full Text Available Reliability of a system is the ability of a system to do prospected duties in future and the probability of desirable operation for doing predetermined duties. Power system elements failures data are the main data of reliability assessment in the network. Determining antiseptic parameters is the goal of reliability assessment by using system history data. These parameters help to recognize week points of the system. In other words, the goal of reliability assessment is operation improving and decreasing of the failures and power outages. This paper is developed to assess reliability indices of Bakhtar Regional Electricity Company up to 1393 and the improving methods and their effects on the reliability indices in this network. DIgSILENT Power Factory software is employed for simulation. Simulation results show the positive effect of improving methods in reliability indices of Bakhtar Regional Electricity Company.

  17. The solar two power tower project

    International Nuclear Information System (INIS)

    Chavez, J.M.; Klimas, P.C.; Laquil, P. de III; Skowronski, M.

    1993-01-01

    A consortium of United States utility concerns led by Southern California Edison Company (SCE) has begun a cooperative project with the U.S. Department of Energy (DOE) and industry to convert the 10-MWe Solar One Tower Pilot Plant to molten nitrate salt technology. Successful operation of the convert plant to be called Solar Two, will reduce the economic risks in building the initial commercial power tower projects and accelerate the commercial acceptance of this promising renewable energy technology. In a molten salt power tower plant, sunlight is concentrated by a field of sun-tracking mirrors, called heliostats, onto a centrally located receiver, atop a tower. Molten salt is heated in the receiver and stored until it is needed to generate steam to power a conventional turbine generator. Joining the SCE and DOE in sponsoring in sponsoring this project are the following organizations: Los Alamos department of Water Power, Idaho Power Company, PacifiCorp, Pacific Gas and Electric Company, Sacramento Municipal Utility District, Arizona Public Service Company, Salt River Project, City of Pasadena, California Energy Commission, Electric Power Research Institute, South Coast Air Quality Commission, Electric Power research Institute, South Coast Air Quality Management District, and Bechtel Corporation. The Solar Two project will convert the Solar One heat transfer system from a water/steam type to molten nitrate salt by replacing the water/steam receiver and oil/rock thermal storage system with a nitrate salt receiver, salt thermal storage, and steam generator. The estimate cost of Solar Two, including 3-year test period, is 48.5 millions. The plant will be on line in early 1995. (authors)

  18. Integrated Plant Safety Assessment: Systematic Evaluation Program. Millstone Nuclear Power Station, Unit 1, Northeast Nuclear Energy Company, Docket No. 50-245. Final report

    International Nuclear Information System (INIS)

    1983-02-01

    This report documents the review of the Millstone Nuclear Power Station, Unit 1, operated by Northeast Nuclear Energy Company (located in Waterford, Connecticut). Millstone Nuclear Power Station, Unit 1, is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license. This report also addresses the comments and recommendations made by the Advisory Committee on Reactor Safeguards in connection with its review of the Draft Report, issued in November 1982

  19. A study on economics of power generation in Pakistan

    International Nuclear Information System (INIS)

    Akbar, S.; Saleem Shahid, M.; Anwar Khan, M.; Khushnood, S.

    2005-01-01

    Pakistan is a developing country and has ever increasing requirement of electric power for its development process. Due to lack of timely and proper planning in this field, there has been acute shortage of power supply which has resulted into sever set back specially in industrial sector. To make up this deficiency government of Pakistan invited foreign and local companies for power generation, which has been purchased by WAPDA (water and power development authority-government of Pakistan) at exorbitant rates comparatively higher in this region. The Authors have thoroughly deliberated on the subject, collected the relative data from various government agencies, organizations and literature then carried out the comparative cost analysis of generation of electric power using various resources, keeping in mind the following factors: a) Fuel b) Plant Factor c) Investment Cost d) Operating and Maintenance Cost. The tariff rates of WAPDA have also been considered in this study. Recently two others organizations NEPRA (national electric power regulation authority) and PPIB (private power infrastructure board) has been constituted to regulate the tariffs and issuance of license to the private power generating companies. Now the efforts are in hand to regulate the purchase rate of electric power from the private companies by allowing reasonable profit without exploiting any body. The authors has concluded that timely planning, by providing necessary facilities to the power generation companies and regulating the tariff can facilitate the consumer and protecting them from paying exorbitant tariff. (authors)

  20. Nuclear position in power generation sector - under the pressure of anti-global warming and power market reform

    International Nuclear Information System (INIS)

    Hayashi, Taizo

    2005-01-01

    The future structure surrounding fuel choice in power generation sector should be understood how to evaluate actual and potential merit and demerit both in economic and environmental aspects on nuclear power generation. That is i.e. nuclear can be understood as superior power source without GHGs and on the other hand, as unfavorable power source which might cause some critical dangers due to its hazardous radioactive nuclear waste. On this specific characteristic, this theme on fuel choice surrounding nuclear in power generation sector could be understood as a highly cultural problem as much as economic and political one. For instance, we can observe quite opposite direction with each other on nuclear power development in European countries like France and Finland on one hand and Germany and Sweden on the other hand. Looking at Asian countries, we also observe the very reality of high economic growth with rapid growth of electricity demand like China. What on earth, is it really possible without nuclear power source for such gigantic countries. I will develop my personal idea on nuclear power source based on Japanese experience towards successfully managing nuclear power technologies in the world, consisting of developing countries with growing economies and of advanced ones with rather matured nuclear technology under the pressure of environmentally restricted world order. My basic view point to discuss nuclear power problem has, conclusionally speaking, several aspects; The first one is in the relation with deregulation or liberalization of electricity market, which has been undergoing among such developed countries as OECD member countries i.e. USA, EU, Japan and other countries. Deregulation or liberalization of electricity market seems to be the inevitable process towards more matured market economy among developed countries group, and that process inevitably forces management of power companies towards more near sighted attitude if those companies are

  1. Birecik: a role model for private companies

    Energy Technology Data Exchange (ETDEWEB)

    Holzmann, P. [Corporate Communications, Frankfurt am Main (Germany)

    2001-04-01

    The Birecik hydroelectric power project in Turkey is highlighted as a good example of the effectiveness of a private sector company in planning, financing and constructing a hydro power plant on a build, operate and transfer (BOT) basis. Birecik AS has built the 672 MW plant and dam on the River Euphrates near the border with Syria as part of a Turkish government plan to develop southeast Anatolia. The dam, which was built on schedule and within budget, has embankments on the left and right hand sides and a gravity dam in the centre containing the power house, intake and spillway. The power house contains six Francis turbines, three of which are already operational. The plant's specifications and other vital statistics are summarised in a table. Its location is shown in a map of Turkey.

  2. No 3071. Resolution proposal aiming at creating an inquiry commission on the pricing conditions on the power market, and on their consequences for companies and consumers and on the necessity to implement regulation mechanisms

    International Nuclear Information System (INIS)

    Brottes, F.; Ayrault, J.M.; Bataille, Ch.; Ducout, P.; Emmanuelli, H.; Migaud, D.; Besson, E.; Bonrepaux, A.; Dumont, J.L.; Balligand, J.P.

    2006-05-01

    Electricite de France (EdF), the French electric utility, announced on December 15, 2004 a rise of electricity prices and tariffs in order to finance EDF's development policy. About a year later, the electricity prices rise was much higher than expected and not justified neither by the financial health of the company, nor by any other particular reason. The only reason seems to be the classical logic that follows the privatization of any historical power operator: opening of the capital, reduction of manpower, and increase of prices. This document wonders about: the impact of prices rise on power consuming companies and on individual end-users, the real role of the commission of energy regulation (CRE) and on the reality of an energy market regulation. (J.S.)

  3. Study of the dynamic operational characteristics of the Taiwan Power Company system - a nuclear majority system

    International Nuclear Information System (INIS)

    Yu, I.H.

    1982-01-01

    All conclusions drawn in this dissertation are based on the results of about six hundred study cases. The dynamic characteristics of the present Taiwan Power Company system are very different not only from the characteristics of any other power system in the world but also from Taipower's own history characteristics. Based on the engineers' knowledge, this dissertation takes a calculation risk approach to deal with the problems in the energy systems. Chapter I introduces the information related with the stability of the present Taipower system. Taipower operating engineers are facing the problem of committing a large amount of nuclear generation at a low base load level. The general introduction of the stability program developed for this study is described in Chapter II. In Chapter III, the processes of performing the transient stability study are explained to show how this study was performed. Critical tie flows were suggested in Chapter IV, which might help balance the nuclear generation and thermal generation at the base load level and plan the unit maintenance schedule. Several operation modes which may increase the degree of stability or minimize the number unit trippings were discussed in Chapter V. In Chapter VI, how to adjust the load shedding policy to improve the stability are discussed. The remote tripping scheme which is effective in preventing massive system blackout was studied in Chapter VII. Some broader concepts in load management are presented in Chapter VII for Taipower's management decision

  4. Canadian company innovates dam repair

    International Nuclear Information System (INIS)

    Anon.

    2000-01-01

    Successful repair without any downtime, of the Sabana Yegua power and irrigation structure in the western Dominican Republic by Aquatic Sciences Ltd., a St. Catherine, Ontario-based underwater specialist company, is discussed. The structure was damaged by Hurricane George last when when rising water levels damaged a major valve in the control gate chamber. The repair strategy designed by Aquatic Sciences used a remotely operated vehicle with a mechanical arm for minor tasks which placed a specially-made plug into the inlet pipe. The work was completed in one week, saving the utility company a great deal of money by making it possible to make the repairs remotely in the gate chamber without having to drain the tunnel, as would have been necessary had the repair been completed manually. The remotely operated vehicles use a scanning sonar as well as light to find their way. They are particularly well adapted to work underwater under low-visibility conditions

  5. The Business Case for Fuel Cells 2011: Energizing America's Top Companies

    Energy Technology Data Exchange (ETDEWEB)

    Delmont, Elizabeth [Fuel Cells 2000, Washington, DC (United States); Gangi, Jennifer [Fuel Cells 2000, Washington, DC (United States); Curtin, Sandra [Fuel Cells 2000, Washington, DC (United States)

    2011-11-01

    This report was developed by Fuel Cells 2000 with support from the Fuel Cell Technologies program. The report profiles nationally recognizable companies and corporations that are deploying or demonstrating fuel cells for powering forklifts and providing combined heat and power to their stores and headquarters.

  6. A forward looking company

    International Nuclear Information System (INIS)

    Christian, David A.

    2004-01-01

    The article is an excerpt of an interview with David A. Christian, Senior Vice President-Nuclear and Chief Nuclear Officer, Dominion Generation conducted at NEI's Nuclear Energy Assembly in New Orleans, Louisiana on 13 May 2004. It highlights the company's energy diversity, and in particular, activities related to early-site permits and possible future plans for nuclear power plant development in the U.S. The interview touches on questions related to the Consortium (composed of Dominion, AECL Technologies, the U.S. subsidiary of AECL, Hatachi America and Bechtel Power Corp.) and the DOE financial support involved (approximately 50%) along with comments related to job impacts, energy security and climate change impacts, human resource issues (particularly about getting high school students interested in jobs related to the nuclear industry) and public policy. The interview ends with a discussion of investment interest and the state of standardization in the industry

  7. China Wind Power Outlook 2010

    International Nuclear Information System (INIS)

    Junfeng, Li; Pengfei, Shi; Hu, Gao

    2010-10-01

    China's wind power can reach 230 GW of installed capacity by 2020, which is equal to 13 times the current capacity of the Three Gorges Dam; its annual electricity output of 464.9 TWh could replace 200 coal fire power plants. In 2009, China led the world in newly installed wind-energy devices, reaching a capacity of 13.8 GW (10,129 turbines) - a rate of one new turbine every hour. In terms of overall capacity, China ranks second, at 25.8 GW. The report projects that by 2020, China's total wind power capacity will reach at least 150GW, possibly up to 230GW, which, if realized, could cut 410 million tons of CO2 emission, or 150 million tons of coal consumption. Compared to multinationals, many Chinese companies are young and lack a strong basis for research and development. Despite a renewable energy policy requiring grid companies to purchase all electricity from wind farms, access to wind power for the grid is frequently lagging behind an unstable, out-dated grid infrastructure. There is also the problem of a lack of incentives and penalties for grid companies, and slow progress in more wind energy technologies.

  8. Performance of Power System Stabilizer (UNITROL D) in Benghazi North Power Plant

    OpenAIRE

    T. Hussein

    2011-01-01

    The use of power system stabilizers (PSSs) to damp power system swing mode of oscillations is practical important. Our purpose is to retune the power system stabilizer (PSS1A) parameters in Unitrol D produced by ABB– was installed in 1995in Benghazi North Power Plants (BNPPs) at General Electricity Company of Libya (GECOL). The optimal values of the power system stabilizer (PSS1A) parameters are determined off-line by a particle swarm optimization technique (PSO). The obj...

  9. France liberalizes its power supply market

    International Nuclear Information System (INIS)

    Anon.

    2004-01-01

    The French market of power supply to companies is now free. This means that Electricite de France (EdF), the first world electric utility now has competitors in its domestic market. This is an important challenge for EdF because 3 millions of clients (70% of the French power consumption) are now concerned by the opening of the power market. According to A. Merlin, head of the energy transportation network (RTE), the opening of the market does not increase the risk of black-out, it just makes the operation of power networks more complex. The implementation of a single power transportation company (RTE) simplifies the mastery of networks safety but the development of investments is necessary to ensure the maintenance of 400 kV power lines. A comparison of the situation of power market liberalization is made for 6 countries (Germany, UK, Spain, US, Netherlands and Italy). Short paper. (J.S.)

  10. Incentive mechanisms to promote energy efficiency programs in power distribution companies

    International Nuclear Information System (INIS)

    Osorio, Karim; Sauma, Enzo

    2015-01-01

    Power distribution companies (DISCOs) play an important role in promoting energy efficiency (hereafter EE), mainly due to the fact that they have detailed information regarding their clients' consumption patterns. However, under the traditional regulatory framework, DISCOs have disincentives to promote EE, due to the fact that a reduction in sales also means a reduction in their revenues and profits. Most regulatory policies encouraging EE have some embedded payment schemes that allow financing EE programs. In this paper, we focus on these EE-programs' payment schemes that are embedded into the regulatory policies. Specifically, this paper studies two models of the Principal–Agent bi-level type in order to analyze the economic effects of implementing different payment schemes to foster EE in DISCOs. The main difference between each model is that uncertainty in energy savings is considered by the electricity regulatory institution in only one of the models. In terms of the results, it is observed that, in general terms, it is more convenient for the regulator to adopt a performance-based incentive mechanism than a payment scheme financing only the fixed costs of implementing EE programs. However, if the electricity regulatory institution seeks a higher level of minimum expected utility, it is optimal to adopt a mixed system of compensation, which takes into account the fixed cost compensation and performance-based incentive payments. - Highlights: • We studied different payment schemes to promote energy efficiency in DISCOs. • We propose two bi-level models based on the Principal–Agent theory. • Uncertainty associated with energy savings is incorporated in one of the models. • A performance-based payment scheme is generally more convenient for the regulator. • A mixed payment scheme is optimal when a lower level of uncertainty is tolerated

  11. Development, Dedication and Application of an Automatic Seismic Trip System for Nuclear Power Plants of Taiwan Power Company

    International Nuclear Information System (INIS)

    Liao, Hsin-kai; Lee, Chung-lin; Chen, Chang-kuo; Hsu, Yao-tung; Shyu, Shian-shing

    2011-01-01

    This paper describes the setups of Automatic Seismic Trip System (ASTS), including development, dedication and implementation, for Nuclear Power Plants (NPPs) of Taiwan Power Company (TPC). The purposed ASTS was designed to trip the reactor when big earthquake occurs. These ASTS were classified as class 1E equipment. They were developed and dedicated for safety applications in accordance with IEEE 323-1983, IEEE 344-1987, IEEE 383-1974 and Reg. Guide 1.180 R1. In order to meet the technical specification required by TPC, three sub-units in the ASTS were developed: Earthquake sensors: Kinemetrices FBA-23 triaxial accelerometers are selected since they were successfully used in Taiwan for seismic monitoring for more than 10 years. Signal conditioning module: It is designed to reduce noise from motion accelerometer (FBA-23) and then transmit seismic signal to the set-point and trip unit via instrument amplify circuit, 0.1 to 10Hz band pass filter circuit, absolute-value converter and voltage to current converter. Trip control module: after comparing the seismic signal level and set-point, the result will decide whether to drive the output relay or not. The output relay is used as the interface between ASTS and the reactor protection system in NPP. For the commercial grade item dedication for safety application, five processes were conducted. Those processes are Seismic test: to use plant specific required response spectrum (RRS), the test required spectrum should envelop RRS: Seismic auto-trip accuracy test: must not trip when filtered PA below set point minus 0.05g, and must trip when filtered PA exceeds set point over 0.05g. Trip signals occurred within 10 second interval are considered as same events: NEMA4 water proof test for sensor box: Anti-radiation test: 8.76x100 rads over 40 years: EMI/EMC test: follow RG 1.180 requirement. The ASTS were installed in three NPPs, six units in total, without connection to RPS in 2006. After one year reliable operation, the

  12. Green marketing in the Massachusetts electric company retail competition pilot program

    Energy Technology Data Exchange (ETDEWEB)

    Rothstein, S.M.; Fang, J.M.

    1997-10-01

    With electric industry restructuring initiatives being introduced on the state and federal levels, retail access pilot programs serve an important function for examining competitive market issues, as well as marketing strategies and customer reactions to different power supply options. The experience gained through these pilots provides important insights into future power market operations, including the market for green power. The Massachusetts Electric Company`s (MECo`s) Choice: New England pilot for residential and small-business customers was a voluntary program developed primarily to test the billing and metering logistics that distribution companies will need in the competitive market. The pilot also offered a preview of program implementation and marketing under customer choice. It was the first retail competition pilot to explicitly include green power options in program design. The MECo pilot`s energy suppliers were selected through the issuance of a request for proposals (RFP). Respondents were asked to submit bids in one or more of three energy supply categories-price, green, and other options. These options were developed by the pilot administrator through internal meetings, discussions with state officials and other stakeholders, and a review of information from other similar pilots. For the green option, the pilot administrator did not establish a green standard. Instead, suppliers were allowed to submit offers that promoted environmental stewardship. Customer response to the different green options are reported. The pilot results clearly demonstrate that, in a competitive situation, there is interest in a variety of energy supply options, including green options. 2 tabs.

  13. Vogtle Unit 1 readiness review: Assessment of Georgia Power Company readiness review pilot program

    International Nuclear Information System (INIS)

    Lewis, G.

    1987-09-01

    Georgia Power Company (GPC) performed a readiness review at Vogtle Unit 1 as a pilot program. The pilot program was a new and innovative approach for the systematic and disciplined review, with senior management involvement, of GPC's implementation of design, construction, and operational readiness processes. The program's principal objective was to increase the level of assurance that quality programs at Vogtle Unit 1 have been accomplished in accordance with regulatory requirements. This report assesses the effectiveness of the GPC's readiness review pilot program (RRPP) at Vogtle Unit 1. It includes (1) an overview of what was experienced during the program's implementation, (2) an assessment of how well program objectives were met, and (3) lessons learned on the future use of the readiness review concept. Overall, GPC and the NRC staff believe that the RRPP at Vogtle Unit 1 was a success and that the program provided significant added assurance that Vogtle Unit 1 licensing commitments and NRC regulations have been adequately implemented. Although altering the NRC licensing review process for the few plants still in the construction pipeline may not be appropriate, licensees may benefit significantly by performing readiness reviews on their own initiative as GPC did for Vogtle. (7 refs.)

  14. The future of nuclear power in Europe

    International Nuclear Information System (INIS)

    Kurtz, D.

    1996-01-01

    The current and future prospects of the nuclear power industry in Europe are assessed in this Financial Times Energy Publishing report. Key issues relating to the development of the industry in both Eastern and Western Europe are addressed. Changing governmental and popular attitudes to nuclear power are described and nuclear energy's likely future contribution to Europe's energy needs is discussed. Detailed production and consumption statistics make the document useful reading for those in nuclear generating companies, electric utilities, major power consumers, waste management companies, governments, regulatory bodies, investors and environmental groups amongst others. (UK)

  15. Integration of distributed generation in the power system

    CERN Document Server

    Bollen, Math H J

    2011-01-01

    "The integration of new sources of energy like wind power, solar-power, small-scale generation, or combined heat and power in the power grid is something that impacts a lot of stakeholders: network companies (both distribution and transmission), the owners and operators of the DG units, other end-users of the power grid (including normal consumers like you and me) and not in the least policy makers and regulators. There is a lot of misunderstanding about the impact of DG on the power grid, with one side (including mainly some but certainly not all, network companies) claiming that the lights will go out soon, whereas the other side (including some DG operators and large parks of the general public) claiming that there is nothing to worry about and that it's all a conspiracy of the large production companies that want to protect their own interests and keep the electricity price high. The authors are of the strong opinion that this is NOT the way one should approach such an important subject as the integration...

  16. LWR design decision methodology: Phase II. Final report

    International Nuclear Information System (INIS)

    1981-01-01

    Techniques were identified to augment existing design process at the component and system level in order to optimize cost and safety between alternative system designs. The method was demonstrated using the Surry Low Pressure Injection System (LPIS). Three possible backfit options were analyzed for the Surry LPIS, assessing the safety level of each option and estimating the acquisition and installation costs for each

  17. Analysis of the Internationalization Process of a Venezuelan Company

    Directory of Open Access Journals (Sweden)

    Rosângela Sarmento da Silva

    2013-04-01

    Full Text Available This paper aimed to analyze, under the perspectives of economic and organizational behavior theories, the case of the internationalization of Agrogilca, a Venezuelan company classified as an small and medium business, which operates in the mining segment, agricultural materials and building materials. This is an instrumental case study, which had as sources of evidence the examination of documents provided directly by company’s directors and interviews with its owner and employees. For the data analysis and interpretation, it was took the procedure of adaptation to the theory, since the data obtained empirically were contrasted to elements of already consolidated theories about internationalization of companies. It is concluded that the strategy adopted by Agrogilca company is very close to Theory of Market Power proposed by Hymer, in which companies tend to intensify its position abroad and expand their operations. Its internationalization process did not occur according to the Uppsala model, in which the gradualism of relationship matches the gradualism of internationalization processes, but only with exportations that make companies intensify its position abroad, and finally, shows proximity to the internationalization strategy of Multidomestic Theory of Hoskisson. This is because this theory considers as an internationalization cause the sectoral conditions, political structures and customer needs for a greater administrative performance and competitiveness of the company.

  18. Construction permit of nuclear power plants in case of leasing

    International Nuclear Information System (INIS)

    Anon.

    1983-01-01

    Guiding lines (unofficial): 1. A leasing company can be founded to finance and to operate a nuclear power plant. 2. The leasing company does not require a license according to section 7 of the Atomic Energy Act, for it neither constructs nor posesses the nuclear power plant. 3. This also applies if the proprietor, and later on operator, of the nuclear power plant holds an interest in this leasing company as a shareholder. Section 7, and 19 subsection 3 of the Atomic Energy Act. Higher Administrative Court of Rhineland Palatinate, Decision of July 20sup(th), 1982. (orig.) [de

  19. Discussion of manage mode for nuclear power construcation in China

    International Nuclear Information System (INIS)

    Gao Mingshi; Chen Hua

    2007-01-01

    This paper analyzed the development status of management mode for NPP construction and nuclear power engineering companies. Considering the national development plan of nuclear power, and making reference of the experiences of the successful construction of NPPs, the management mode for NPP construction in which the nuclear engineering companies are the main factors have been discussed. This paper proposed that EPC/TurnKey as the management mode for the nuclear power construction, led by the owner, and constructed by engineering companies according to the contracts, so as to establish a construction group with expertise knowledge. (authors)

  20. Development on power distribution technologies of four electric power companies in Japan. The Kansai Electric Power Co. , Inc

    Energy Technology Data Exchange (ETDEWEB)

    1989-07-01

    Since dependency upon electric power has been rising yearly with the development of industry and the progress of information-oriented society, various kinds of technical development are needed to supply electricity. Furthermore, amenity of people's living has been highly intended, and life style has varied. Consequently, customers' needs for energy including related services have varied remarkably, and each customer has selected energy more subjectively from the wide range of viewpoint such as reliability, handiness, cleanliness, safety, and economic efficiency. In such situation, the power distribution section of Kansai Electric Power settled four themes for major technical development and has been promoting them. Four themes are as follows; to develop a total automation system for power distribution, to promote 20kV/400V-class power distribution, to develop techniques to form facilities harmonizing with local amenity, and to make business management efficient with the advanced NC system. 3 figs., 4 tabs.

  1. 18 CFR 260.1 - FERC Form No. 2, Annual report for Major natural gas companies.

    Science.gov (United States)

    2010-04-01

    ... report for Major natural gas companies. 260.1 Section 260.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.1 FERC Form No. 2, Annual report for Major natural gas companies. (a...

  2. Electric power: the liberalization effects

    International Nuclear Information System (INIS)

    Carpentier, J.

    1999-01-01

    Nine months after the beginning of the deregulation of electric power markets in Europe, the first effects are being felt: fall of prices, amalgamation of electric power companies, development of new technologies and unemployment. (O.M.)

  3. The economic security of power plants

    Directory of Open Access Journals (Sweden)

    Niedziółka Dorota

    2017-01-01

    Full Text Available Currently, power plants in Poland have to work in a very uncomfortable situation. Unstable market conditions and frequent changes in the law may have serious adverse consequences for their economic security. Power plants play a very important role in the economy. The effectiveness of their performance affects the activity of all other businesses. Therefore, it is very important to provide a definition of economic security for the power plants’ sector and the factors determining its level. Maintaining economic security will allow energy generation companies to grow in a sustainable way as well as limit operational risk. A precise definition can also be used to create analytical tools for economic security measurement and monitoring. Proper usage of such tools can help energy generation companies sustain their economic security and properly plan their capital expenditures. The article focuses on the definition of economic security in the “micro” context of a separate business unit (enterprise. We also present an analytical model that measures economic security of a company engaged in the production of energy - a company of strategic importance for the national economy. The model uses macroeconomic variables, variables describing prices of raw material and legal / political stability in the country, as well as selected financial indicators. The appliance of conclusions resulting from the model’s implementation will help provide economic security for companies generating energy.

  4. The nuclear power generation

    International Nuclear Information System (INIS)

    Serres, R.

    1999-01-01

    The French nuclear generating industry is highly competitive. The installations have an average age of fifteen years and are half way through their expected life. Nuclear power accounts for 70% of the profits of the French generating company, EDF. Nuclear generation has a minimal effect on the atmosphere and France has a level of CO 2 emissions, thought to be the main cause of the greenhouse effect, half that of Europe as a whole. The air in France is purer than in neighbouring countries, mainly because 75% of all electrical power is generated in nuclear plants and 15% in hydroelectric stations. The operations and maintenance of French nuclear power plants in the service and distribution companies out of a total of 100 000 employees in all, 90 % of whom are based in mainland France. (authors)

  5. Seeking opportunities abroad : the challenges for small companies

    International Nuclear Information System (INIS)

    Cej, R.P.

    1999-01-01

    The unique challenges facing small companies seeking opportunities in world hydrocarbon trading are discussed. The paper emphasizes how the global infrastructure of the industry has changed and describes what it takes for small companies to compete for opportunities in a global market. The biggest driver re-shaping the energy sector is the pace of global development led by the Asia-Pacific region. Canada's energy sector is well into the challenges created by market liberalization. Canada has evolved into a low cost energy supply and must remain so to support the competitiveness of other industry sectors. Overall, opportunities abroad for small companies are good. Commitment to the long haul, acquiring an understanding for the culture, the politics, and the way business is done in the country in question, careful attention to estimating the size and staying power needed to manage the opportunity, and avoiding cutting corners, or spreading oneself too thinly, are crucial to success

  6. Positioning of Engineer Ethics from the Standpoint of a Company. And the Ethics Education Towards Practice

    Science.gov (United States)

    Sato, Masaki

    The purpose of a company is contribution to society by operating activities. Therefore, it has a company principle and “Business ethics” conduct codes in each. On the other hand, many engineers with specialties are performing business toward the same purpose at the same company. And it will produce new inconsistency by introducing “Engineer ethics” and “the ethics of each professional” all at once in the situation of that company. Then, the engineer ethics education in company needs to carry out by arranging company conduct codes and Engineer ethics. This paper proposes what the company ethics education should be from exemplifying results by make activities and engineer ethics education of the corporate ethics observance in the Tokyo Electric Power Co., Inc.

  7. 77 FR 40914 - In the Matter of Indiana Michigan Power Company, D. C. Cook Nuclear Power Plant; Confirmatory...

    Science.gov (United States)

    2012-07-11

    ... Company met in an ADR session mediated by a professional mediator, arranged through Cornell University's... counsel or representative) to digitally sign documents and access the E-Submittal server for any... requirements for accessing the E-Submittal server are detailed in the NRC's ``Guidance for Electronic...

  8. UCH-II, private power project, Dera Murad Jamali, Pakistan. Export trade information

    Energy Technology Data Exchange (ETDEWEB)

    1993-01-01

    Energy Resources International and Power Development Company of Pakistan in association with General Electric Corporation, Inc. offers to build, finance, own and operate a 500+ MW combined cycle natural gas electric power plant, near Dera Murad Jamali, Pakistan. The basis for the undertaking is a carefully balanced and integrated series of contracts for fuel, power purchase, and implementation of the proposed project. The contracts would be established between the Government of Pakistan (GOP), its agencies and instrumentalities, Energy Resources International with Power Development Company and its associates, and a Project Company organized specifically for the undertaking. The report describes the project.

  9. ORGANIZATIONAL ROUTINES IN RUSSIAN COMPANIES: REVIEW OF PRACTICES

    Directory of Open Access Journals (Sweden)

    Olga Valieva

    2014-10-01

    Full Text Available Results of the first stage of the researches conducted in 2012-2013 are presented in article. Researches are connected with studying of transformational processes intra corporate of managemetn practices in the Russian companies and their subsequent institutionalization. Preliminary results showed that in the companies there is a standard set of organizational routines which part are information, and administrative routines, routines of the power of the founder, genetic, institutional and development routines. During research statistically significant connection between types of organizational structures, the sizes of the organization, information processing and administrative practices is established. It is revealed as change of approaches to management of the organization can affect a corruption component.

  10. Alliance created to study wind-generated power potential

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    Wind-generated power may get a boost from a new consortium of companies that have joined together to expand the potential across the country for this cheap, renewable energy source. Niagara Mohawk Power Corporation has announced that it will join with the Pacific Gas and Electric Company (PG ampersand E), the Electric Power Research Institute (EPRI) and US Windpower, Inc., in developing an advanced, 33-meter, variable-speed wind turbine that reduced the cost and improves the power quality of wind energy. The majority of the estimated $20 million cost will be provided by US Windpower

  11. Piercing of corporate veil of nuclear companies; Durchgriffshaftung der Atomkonzerne

    Energy Technology Data Exchange (ETDEWEB)

    Frenz, Walter [RWTH Aachen Univ. (Germany). Lehr- und Forschungsgebiet Berg-, Umwelt- und Europarecht

    2015-11-15

    The Federal Ministry of Economics plans that the nuclear companies with all their assets to cover disposal costs can be used where a power plant operator is governed by its parent company, hence the latter Capital or voting majority of the operators holding or these passes; To date, the parent company is liable only limited and not more than five years after the end of the domination of one Subsidiary, oparating a power plant. In this way, prevents ultimately the public sector and thus the Taxpayers have to pay for the long-term consequences of the use of nuclear energy. Until now ensured paragraph 303 AktG a group law Secondary liability the parent companies of the operating company in the case of of termination of the control and profit transfer agreements is very limited for the nuclear liabilities, namely in two ways: The claim is only focused on the backup performance and not at the expense of acquisition and Moreover, according to the case law limited of five years after its foundation; for the area of transformation law comparable rules are valid. thereby the dismantling of a nuclear power station takes just already for 20 years and a final repository is expected before 2050 not be available. [German] Das Bundeswirtschaftsministerium plant, dass die Atomkonzerne mit ihrem ganzen Vermoegen zur Deckung der Entsorgungskosten herangezogen werden koennen, soweit ein Kraftwerksbetreiber von seinem Mutterkonzern beherrscht wird, mithin Letzterer die Kapital- oder Stimmrechtsmehrheit an dem Betreiber haelt bzw. diesen leitet; bislang haftet der Mutterkonzern nur eingeschraenkt und hoechstens fuenf Jahre nach Beendigung der Beherrschung einer Tochtergesellschaft, die ein Kraftwerk betreibt. Auf diese Weise wird verhindert, dass letztlich die oeffentliche Hand und damit der Steuerzahler fuer die Spaetfolgen der Kernenergienutzung zahlen muss. Bislang gewaehrleistet paragraph 303 AktG eine konzernrechtliche Nachhaftung der Muttergesellschaften der

  12. The protection of environmental interests through corporate governance: A South African company law perspective.

    Directory of Open Access Journals (Sweden)

    Anthony O Nwafor

    2015-07-01

    Full Text Available The quest to maximize profits by corporate administrators usually leaves behind an unhealthy environment. This trend impacts negatively on long term interests of the company and retards societal sustainable development. While there are in South Africa pieces of legislation which are geared at protecting the environment, the Companies Act which is the principal legislation that regulates the operations of the company is silent on this matter. The paper argues that the common law responsibility of the directors to protect the interests of the company as presently codified by the Companies Act should be developed by the courts in South Africa, in the exercise of their powers under the Constitution, to include the interests of the environment. This would guarantee the enforcement of the environmental interests within the confines of the Companies Act as an issue of corporate governance.

  13. Power marketing and renewable energy

    International Nuclear Information System (INIS)

    Fang, J.M.

    1997-01-01

    Power marketing refers to wholesale and retail transactions of electric power made by companies other than public power entities and the regulated utilities that own the generation and distribution lines. The growth in power marketing has been a major development in the electric power industry during the last few years, and power marketers are expected to realize even more market opportunities as electric industry deregulation proceeds from wholesale competition to retail competition. This Topical Issues Brief examines the nature of the power marketing business and its relationship with renewable power. The information presented is based on interviews conducted with nine power marketing companies, which accounted for almost 54% of total power sales by power marketers in 1995. These interviews provided information on various viewpoints of power marketers, their experience with renewables, and their respective outlooks for including renewables in their resource portfolios. Some basic differences exist between wholesale and retail competition that should be recognized when discussing power marketing and renewable power. At the wholesale level, the majority of power marketers stress the commodity nature of electricity. The primary criteria for developing resource portfolios are the same as those of their wholesale customers: the cost and reliability of power supplies. At the retail level, electricity may be viewed as a product that includes value-added characteristics or services determined by customer preferences

  14. Physical decommissioning of the Shippingport Atomic Power Station

    International Nuclear Information System (INIS)

    Crimi, F.P.

    1988-01-01

    The Shippingport Atomic Power Station consists of the nuclear steam supply system and associated radioactive waste processing systems, which are owned by the United States Department of Energy (USDOE), and the turbine-generator and balance of plant which is owned by the Duquesne Light Company. The station is located at Shippingport, Pennsylvania on seven acres of land leased by USDOE from the Duquesne Light Company. The Shippingport Station Decommissioning Project (SSDP) is being managed for the USDOE by the General Electric Company and its integated subcontractor, Morrison Knudsen-Ferguson (MK-F) Company. The objectives of the Shippingport Station Decommissioning Project (SSDP) are to: Demonstrate the safe and cost effective dismantlement of a large scale nuclear power plant; Provide useful data for future decommissioning projects

  15. Effects of the financial crisis on the wealth distribution of Korea's companies

    Science.gov (United States)

    Lim, Kyuseong; Kim, Soo Yong; Swanson, Todd; Kim, Jooyun

    2017-02-01

    We investigated the distribution functions of Korea's top-rated companies during two financial crises. A power-law scaling for rank distribution, as well as cumulative probability distribution, was found and observed as a general pattern. Similar distributions can be shown in other studies of wealth and income distributions. In our study, the Pareto exponents designating the distribution differed before and after the crisis. The companies covered in this research are divided into two subgroups during a period when the subprime mortgage crisis occurred. Various industrial sectors of Korea's companies were found to respond differently during the two financial crises, especially the construction sector, financial sectors, and insurance groups.

  16. Customer Relationship Management Systems - Why Many Large Companies Do Not Have Them?

    Science.gov (United States)

    Cunha, Manuela; Varajão, João; Santana, Daniela; Bentes, Isabel

    Today's information technologies are heavily embedded in the reality of organizations. Their role is essential not only at the level of internal processes optimization, but also the interaction between the company and its environment. In this context, the Customer Relationship Management (CRM) systems are powerful competitive tools in many different sectors of activity. Despite the undeniable importance of these systems, there are in practice, many large companies that do not use them. Supported by the results of a survey carried out in a sample of large enterprises, this paper seeks to answer to the research question "why many large companies do not have CRM systems".

  17. Earning capacity of environmentally friendly companies and social responsible investing

    International Nuclear Information System (INIS)

    Bjerk, Jan

    2002-01-01

    Firms on Dow Jones Sustainability Index yield over time the same return as the ''ordinary'' firms on the Dow Jones World Stock Index. There are several investment funds today that deal in shares with selected companies having a high environmental or ethical profile. This is Social Responsible Investing (SRI). When the Norwegian company Storebrand Kapitalforvaltning selects companies for SRI, they exclude immediately nuclear power stations, tobacco factories and manufacturers of land mines. In addition to the same return on invested capital, both investors and society get an environmental profit. The firms analysed and selected by Storebrand for SRI contributes significantly less negative environmental effects than the other firms, typically 33% less to the global heating and have on average 53% less toxic emissions and 45% less water consumption

  18. 1999 Annual report: compression + power + service

    International Nuclear Information System (INIS)

    2000-01-01

    Enerflex manufactures, services and leases compression systems for the production and processing of natural gas and gas-fueled power generation systems. Design, engineering, project management, financing, installation commissioning and after-sales service are also part of Enerflex's arsenal of tools to ensure innovation, and high standards of quality and service. In 1999, Enerflex suffered an 18 per cent decline in revenues from $315 million in 1998 to $257 million in 1999, entirely due to lower sales of big ticket compression equipment in Canada. At the same time, revenues from international sales and service increased to $ 61.8 million in 1999, from $ 53 million in 1998. The company successfully completed the move to a new 328,000 sq. ft state-of-the-art manufacturing facility, and made its first significant sale to the United States in 1999 in the form of delivering a coal bed methane project in the Powder River area of Wyoming, and power generation equipment to Massachusetts. Although in the short term unusually warm average temperatures, industry cash flows, and access to capital may determine demand for the company's products and services, the long-term fundamentals are positive and demand for compression equipment and power generation systems is likely to grow. Indeed, in the fourth quarter of 1999, market conditions improved significantly and the company recorded its highest quarterly revenues and earnings during the last quarter. The annual review provides further details about the operations of the company's various divisions, (Compression and Power Systems, Parts and Compression Services, Leasing and Financing), management's review of the company's overall operations and finances, audited financial statements, and shareholders' information

  19. 75 FR 57299 - First Energy Nuclear Operating Company; Notice of Receipt and Availability of Application for...

    Science.gov (United States)

    2010-09-20

    ... NUCLEAR REGULATORY COMMISSION [NRC-2010-0298; Docket No. 50-346] First Energy Nuclear Operating Company; Notice of Receipt and Availability of Application for Renewal of Davis Besse Nuclear Power...Energy Nuclear Operating Company, filed pursuant to Section 104(b) of the Atomic Energy Act of 1954, as...

  20. Wind power barometer

    International Nuclear Information System (INIS)

    Anon.

    2012-01-01

    Despite the economic crisis affecting most of the globe's major economies, wind energy continues to gain supporters around the world. Global wind power capacity increased by 40.5 GW between 2010 and 2011 compared to a 39 GW rise between 2009 and 2010, after deduction of decommissioned capacity. By the end of 2011 global installed wind turbine capacity should stand at around 238.5 GW, and much of the world's growth is being driven by capacity build-up in the emerging markets (China, India...). In 2011 Asia was the world's biggest market (52%) ahead of Europe (24.5%) and North-America (19.7%). Europe has still the largest wind power capacity in the world with 40.6% of total in 2011. 2011 was another tough year for Vestas company while Gamesa company has managed to maintain positive profit growth by gaining market shares abroad. Siemens keeps its lead in the offshore market. The Chinese market is now suffering form excess capacity and Chinese companies fell prey to domestic competition

  1. LWR design decision methodology: Phase II. Final report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-01-01

    Techniques were identified to augment existing design process at the component and system level in order to optimize cost and safety between alternative system designs. The method was demonstrated using the Surry Low Pressure Injection System (LPIS). Three possible backfit options were analyzed for the Surry LPIS, assessing the safety level of each option and estimating the acquisition and installation costs for each. (DLC)

  2. Discussion on organization structure system of nuclear power projects in China

    International Nuclear Information System (INIS)

    Wang Zhi

    2011-01-01

    With the development of the nuclear power industry in China, several AE companies were born and now play a major role in building nuclear power projects in China and overseas. After studying current organization structure systems of all nuclear power AE companies in China and comparing with successful foreign ones, this paper proposes some approaches to optimize the structure. (author)

  3. The Tokai-mura JCO criticality accident and the activities of the accident countermeasure support team of Electric Power Companies, Japan

    International Nuclear Information System (INIS)

    Ogawa, Junko

    2000-01-01

    A criticality accident occurred at the JCO Tokai-mura nuclear fuel processing plant on September 30, 1999. This accident brought the damages which were unrivaled in the history of atomic energy development in Japan, seriously influencing the citizen life to such an extent as requesting for 320,000 inhabitants within 10 kilometers radius to stay indoors for as long as 18 hours. However, it could be said that though three workers suffered fatal injuries, no substantial hazards were made upon the regional inhabitants due to little release of radioactive substances. This video recorded the activities of the Accident Countermeasure Support Team of the Electric Power Companies immediately after the accident occurred, showing the chronological overview of the particulars of the accident. (author)

  4. Modeling the Impact of Mergers and Acquisitions of Companies on their Capitalization

    Directory of Open Access Journals (Sweden)

    Kolodiazhna Tatiana V.

    2017-07-01

    Full Text Available In the context of economic globalization, the most common approaches to creating powerful companies that have high market value are those that use mergers and acquisitions. In Ukraine, such processes also have been considerably intensified in recent years. However, in the national economic science, the problems of evaluating the impact of mergers and acquisitions of companies on their capitalization, as well as on the concentration and competitiveness of the country’s economy, have not been solved to date. The article is aimed at analyzing the market capitalization of the world’s largest companies and modeling the impact of their mergers and acquisitions on the capitalization of their economies. As a result of the study, it has been determined that modeling the impact of the mergers and acquisitions of the world’s companies on the level of capitalization of their economies has proved the hypothesis that the countries of the world, where mergers and acquisitions of companies are more extensive, also have larger capitalization level.

  5. Evaluation of co-sourcing communications amongst international company and local public relations agencies (case company: company x)

    OpenAIRE

    Yin, Ying

    2009-01-01

    The subject of the thesis is the evaluation of co-sourcing communications amongst international company and local public relations agencies, taking the company x as a case. It analyses the environment the co-sourcing PR agencies communicate with international clients, compares with the current communications the case company has, and comes up with practical suggestions for the company to have better cooperation with local agencies to achieve mutual benefits. The theoretical part consi...

  6. DSM energy saving pilot project report. Company Augstceltne Ltd., Riga, Latvia

    Energy Technology Data Exchange (ETDEWEB)

    Krievins, P.; Cakuls, A.; Kaross, V.; Jansons, D.

    1995-05-01

    This report is a part of the Joint Latvian - Danish Project DEMAND SIDE MANAGEMENT AND ENERGY SAVING. The Project is a part of the Danish aid and technology transfer to Latvia. It is the result of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and a Danish team, which was represented by Danish Power Consult. The purpose of this pilot project was not only to carry out energy audit in the company Augstceltne Ltd and propose demand side management and energy saving measures. Another task of the project was the application of DPC energy audit methodic, measuring equipment and software in Latvian conditions and the promotion of energy saving programs in Latvia in this way. The Company Augstceltne Ltd was created to rent the rest of premises for many other independent companys and to earn money for surviving. Now the Company has 9 buildings with a total area of 26,920 square meters. The tower block has 23 floors and it is the main business centre. 66 companies are located in the building. (EG)

  7. China Wind Power Outlook 2010

    Energy Technology Data Exchange (ETDEWEB)

    Junfeng, Li; Pengfei, Shi; Hu, Gao [Chinese Renewable Energy Industries Association CREIA, Beijing (China)

    2010-10-15

    China's wind power can reach 230 GW of installed capacity by 2020, which is equal to 13 times the current capacity of the Three Gorges Dam; its annual electricity output of 464.9 TWh could replace 200 coal fire power plants. In 2009, China led the world in newly installed wind-energy devices, reaching a capacity of 13.8 GW (10,129 turbines) - a rate of one new turbine every hour. In terms of overall capacity, China ranks second, at 25.8 GW. The report projects that by 2020, China's total wind power capacity will reach at least 150GW, possibly up to 230GW, which, if realized, could cut 410 million tons of CO2 emission, or 150 million tons of coal consumption. Compared to multinationals, many Chinese companies are young and lack a strong basis for research and development. Despite a renewable energy policy requiring grid companies to purchase all electricity from wind farms, access to wind power for the grid is frequently lagging behind an unstable, out-dated grid infrastructure. There is also the problem of a lack of incentives and penalties for grid companies, and slow progress in more wind energy technologies.

  8. Kaizen-Driven Approach While Managing Industrial Projects. A Scandinavian Company Succeeds in Eastern Europe

    Directory of Open Access Journals (Sweden)

    Popescu Daniel

    2015-02-01

    Full Text Available Eastern European companies have experienced various and radical transformations, as resultof the economic crises and turbulences, which exposed structural weaknesses. In the meantime, long-term challenges - such as globalization, shift of power centers from the nationallevel to international structures or scarcity of resources - intensify. Given this context, it ismandatory for companies to develop strategies aiming at being competitive.

  9. Countermeasure to plant life management of the nuclear power plants out of Japan

    International Nuclear Information System (INIS)

    1999-01-01

    Some investigations on countermeasure to plant life management of the nuclear power plants were begun since beginning of 1990s under cooperation with Ministry of International Trade and Industry and all electric power companies under consideration of recent state on abroad and at concept of preventive conservation implementation against the plant life management. As a result, the Tokyo Electric Power Company, the Kansai Electric Power Company and the Japan Atomic Power Company settled each program on countermeasure to plant life management of the Fukushima-1 Power Plant, the Mihama-1 Power Plant and the Tsuruga-1 Power Plant, respectively, which were reported to the Atomic Energy Safety Commission to issue on February, 1999, after deliberation in the Adviser Group of Ministry of International Trade and Industry. Such investigations on countermeasure to the plant life management are also conducted out of Japan in parallel to those in Japan, which contain programs reflecting states of operation and maintenance of nuclear power plants and atmosphere around atomic energy in each country. Here were described on some present states of the countermeasures to plant life management in U.S.A., France, Germany, Sweden, England and so forth. (G.K.)

  10. A Conceptual Model for the Creation of a Process-Oriented Knowledge Map (POK-Map and Implementation in an Electric Power Distribution Company

    Directory of Open Access Journals (Sweden)

    Babak Teimourpour

    2015-12-01

    Full Text Available Helping a company organize and capture the knowledge used by its employees and business processes is a daunting task. In this work we examine several proposed methodologies and synthesize them into a new methodology that we demonstrate through a case study of an electric power distribution company. This is a practical research study. First, the research approach for creating the knowledge map is process-oriented and the processes are considered as the main elements of the model. This research was done in four stages: literature review, model editing, model validation and case study. The Delphi method was used for the research model validation. Some of the important outputs of this research were mapping knowledge flows, determining the level of knowledge assets, expert-area knowledge map, preparing knowledge meta-model, and updating the knowledge map according to the company’s processes. Besides identifying, auditing and visualizing tacit and explicit knowledge, this knowledge mapping enables us to analyze the knowledge areas’ situation and subsequently help us to improve the processes and overall performance. So, a process map does knowledge mapping in a clear and accurate frame. Once the knowledge is used in processes, it creates value.

  11. Carbon Risk Analysis Of The South African Banks’ Lending To The JSE100 CDP Companies

    Directory of Open Access Journals (Sweden)

    Alfred Bimha

    2015-11-01

    Full Text Available There is a pertinent concern over the continued lending to companies that are still pursuing projects that increase the amount of carbon emissions in the atmosphere. South Africa has most of its energy generation being done through coal thermal powered turbines. More so there are a number of new power stations being built in South Africa that are coal powered. Coal on the other hand is deemed as having the highest amount of carbon that contributes to the greenhouse effect which in turn affects the climate leading to climate change consequences. There is also a growing concern on the uptake of renewable energy initiatives by companies that are deemed carbon intensive. Banks are being castigated for not using their economic transformation role to champion the agenda of combating climate change caused by carbon emissions. In this study, the extent of lending in the short and long term to carbon intensive companies by South African banks is examined. Using a sample of the Johannesburg Stock Exchange top 100 companies that participate in Carbon Disclosure Project, an analysis is done through four carbon metrics –carbon intensity, carbon dependency, carbon exposure, carbon risk. The analysis used public information from the banks’ websites, South African Reserve Bank reports and other public databases that contain sustainability information of the JSE100 companies. The analysis was done by comparing the carbon metrics of the recognized seven (7 sectorial industry catergories (SIC on the JSE, mainly Energy & Materials, Industrials, Consumer Staples, Consumer Discretionary, Financials, IT & Telecoms and Health Care. The major finding of the research is that there is a high carbon risk in short term loans compared to long term loans across the JSE100 companies that are analysed. More so, the Energy & Materials sector seem to have the highest carbon risk compared to the other sectors.

  12. Die Energiewerke Nord GmbH. From operator of a decommissioned Russian nuclear power plant to one of Europe's leading decommissioning companies

    International Nuclear Information System (INIS)

    Philipp, Marlies

    2011-01-01

    EWN GmbH is a state-owned company with these duties: - decommissioning and demolition of the Greifswald and Rheinsberg nuclear power stations; - safe operation of the Zwischenlager Nord interim store; - development of the 'Lubminer Heide' industrial and commercial estate. Other projects for which EWN GmbH uses its know-how: - disposal of 120 decommissioned Russian nuclear submarines in Murmansk; - decommissioning and dismantling of the Juelich, NRW, AVR experimental reactor; - demolition of nuclear plants; running the Central Decontamination Operations Department at Karlsruhe, BW. Since 2008, EWN GmbH has held 25% of the shares of Deutsche Gesellschaft zum Bau- und Betrieb von Endlagern fuer Abfallstoffe mbH (DBE), a firm building and operating nuclear repositories. (orig.)

  13. The development of market power in the Spanish power generation sector: Perspectives after market liberalization

    International Nuclear Information System (INIS)

    Ciarreta, Aitor; Nasirov, Shahriyar; Silva, Carlos

    2016-01-01

    This paper provides a comprehensive analysis of the market power problem in the Spanish power generation sector and examines how and to which extent the market has developed in terms of market power concerns after the market liberalization reforms. The methodology applied in this study includes typical ex-post structural and behavioral measures employed to estimate potential for market power, namely: concentration ratios (CR) (for the largest and the three largest suppliers), the Herfindahl–Hirschman Index (HHI), Entropy, Pivotal Supply Index, the Residual Supply Index and Residual Demand Elasticity (RDE). The results are presented for the two largest Spanish generating companies (Endesa and Iberdrola) acting in the Iberian Electricity Market (MIBEL), and in the Spanish Day-ahead electricity market. The results show evidence that these companies have behaved much more competitively in recent periods than in the beginning of the market liberalization. In addition, the paper discusses important structural and regulatory changes through market liberalization processes in the Spanish Day-ahead electricity market. - Highlights: •Competition and regulation in the Spanish electricity market. •The methodology applied in this study: ex-post structural and behavioral measures. •Key dominant companies behaved more competitively in recent periods. •Important structural and regulatory changes in the Spanish electricity market.

  14. Power up your plant - An introduction to integrated process and power automation

    Energy Technology Data Exchange (ETDEWEB)

    Vasel, Jeffrey

    2010-09-15

    This paper discusses how a single integrated system can increase energy efficiency, improve plant uptime, and lower life cycle costs. Integrated Process and Power Automation is a new system integration architecture and power strategy that addresses the needs of the process and power generation industries. The architecture is based on Industrial Ethernet standards such as IEC 61850 and Profinet as well as Fieldbus technologies. The energy efficiency gains from integration are discussed in a power generation use case. A power management system success story from a major oil and gas company, Petrobras, is also discussed.

  15. Innovations in techniques of electric power in 2008

    International Nuclear Information System (INIS)

    Ohfusa, Takahiro; Endo, Yukio; Ino, Hiroyuki

    2009-01-01

    Tokyo Electric Power Company (TEPCO), Kansai Electric Power Co., Inc., Tohoku Electric Power and other nine companies reported the results of innovations in techniques of electric power in 2008, Japan. J-Power started construction of the Ohma Nuclear Power Plant (power generating capacity: 1,383 MW, ABWR) in Ohma Town, Aomori prefecture, Japan, in May 2008. TEPCO developed the low vibration control valve and carried out the model experiments using air as fluid and the simulation by computational fluid dynamics. Mach number distribution (ε L =0.068) at the valve showed change of the supersonic jet flow as time advanced and a periodic pressure change on the valve and valve seat. Japan Atomic Power Company reported development of techniques for the established nuclear power station such as control of pipe thinning of the secondary system of PWR by insertion of oxygen at Tsuruga Power Station Unit 2, risk evaluation, the effects of increase of generating power on aging deterioration, and development of heat protective clothing. Researched are a power generation plant of small-and-medium-size reactors which took in reforming technology using the location to a narrow site, funds by stakeholders and the idea of future 'fast breeder reactor system', sodium-cooled loop type reactor, which uses TRU as fuel. The accumulator tank of new type safety system for Tsuruga Power Station Unit 3 and 4 is designed and tested. Decommissioning process of Tokai Power Plant and recycling of shielding materials, blocks and concrete powder are stated. (S.Y.)

  16. Integrated-plant-safety assessment Systematic Evaluation program. Millstone Nuclear Power Station, Unit 1, Northeast Nuclear Energy Company, Docket No. 50-245

    International Nuclear Information System (INIS)

    1982-11-01

    The Systematic Evaluation Program was initiated in February 1977 to review the designs of older operating nuclear reactor plants to reconfirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of the Millstone Nuclear Power Station, Unit 1, operated by Northeast Nuclear Energy Company (located in Waterford, Connecticut). Millstone Nuclear Power Station, Unit 1, is one of ten plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review. It is expected that this report will be one of the bases in considering the issuance of a full-term operating license in place of the existing provisional operating license

  17. Surry Power Station, Units 1 and 2. Annual operating report for 1976, section 2: core performance and startup physics test reports

    International Nuclear Information System (INIS)

    1977-01-01

    The analyses of four core performance indicators including burnup distribution, reactivity depletion, power distribution, and primary coolant activity are discussed. Information is presented concerning fuel densification monitoring; start-up physics testing; and James River temperature, salinity, fish, biota, and plankton entrainment monitoring

  18. Use of thermoelectric generators for improve power dependability over grid power

    Energy Technology Data Exchange (ETDEWEB)

    Archer, Jack [Global Thermoelectric, Calgary (Canada)

    2005-07-01

    A natural gas transportation company was experiencing extensive pipeline corrosion on some sections of their pipeline protected by impressed current using grid power and rectifiers. After determining that grid power was being interrupted on the affected sections, the gas transporter began looking for a more dependable power supply and chose thermoelectric generators. Since installing thermoelectric generators in 2002, the pipeline potentials have stabilized and transporter was able to experience 100% operational time on affected sections. (author)

  19. Integrated plant safety assessment: systematic evaluation program. Haddam Neck Plant, Connecticut Yankee Atomic Power Company. Docket No. 50-213

    International Nuclear Information System (INIS)

    1983-03-01

    The Systematic Evaluation Program was initiated in February 1977 by the US Nuclear Regulatory Commission to review the designs of older operating nuclear reactor plants to confirm and document their safety. The review provides: (1) an assessment of how these plants compare with current licensing safety requirements relating to selected issues, (2) a basis for deciding on how these differences should be resolved in an integrated plant review, and (3) a documented evaluation of plant safety. This report documents the review of Haddam Neck Plant, operated by Connecticut Yankee Atomic Power Company. The Haddam Neck Plant is one of 10 plants reviewed under Phase II of this program. This report indicates how 137 topics selected for review under Phase I of the program were addressed. Equipment and procedural changes have been identified as a result of the review

  20. Understanding the tariff. Access to the public power transportation network

    International Nuclear Information System (INIS)

    2002-01-01

    Since the European directive of December 19, 1996 about the common rules of the European power market, the eligible companies can chose their power supplier anywhere in Europe. The manager of the French power transportation network (RTE) supplies a network access to these companies according to a tariff fixed by the decree no. 2002-1014 from July 19, 2002. The aim of this document is to explain this tariff: tariffing principles ('mail-stamp' principle, voltage domain, subscribed output power tariffs, input power tariffs), tariffing elements (access to the grid, elements of output tariffs (subscribed power, overload, emergency tariffs, modifications etc..)), invoicing modalities, output tariffs, definitions. (J.S.)

  1. Design of Technical Support System for Retail Company Based on Cloud

    Directory of Open Access Journals (Sweden)

    Shao Ping

    2017-01-01

    Full Text Available With the retail side of the market in China, the sale of electricity companies as a new source of power retail, they participate in the electricity market business. National and local governments subsequently introduced the corresponding policies and rules, the technical support system becomes one of the necessary conditions for the access of the retail company. Retail electricity companies have started the system construction, but has not yet formed a standardized, complete architecture. This paper analyzes the business and data interaction requirements of retail electricity companies, and then designs the functional architecture based on basic application, advanced application and value-added application, and the technical architecture based on “cloud”. On this basis, the paper discusses the selection of private cloud, public cloud and mixed cloud model, and the rationalization suggestion of system construction. Which can provide reference for the construction of the technical support system of the domestic retail enterprises.

  2. How to deal with financial risk under the life circles of nuclear power plant

    International Nuclear Information System (INIS)

    Chen Shilong

    2010-01-01

    Nuclear power plants don't necessarily form enterprise boundary, in the background of nuclear power booming, what characteristics of financial risk exist in nuclear power plant, how to deal with such financial risk and how to sustain a stable development of nuclear power ? Based on the enterprise boundary theory of transaction fees, the separate of the nuclear power plant owner, engineering company and operating company comply with the cost-efficient principle. The financial risk of the plant owner come from the cash flow characteristics under different life circles of its nuclear power plants, due to the passivation of the asset structure in the construction and early operation periods, considering the effects of asset structure on financial risk is meaningless. Based on the owners with single reactor or constructing reactors, big-scale investment holding company is needed to conduct professional asset management, and to diversify the financial risk, on the other hand, professional engineering and operation companies can realize the scale and the multi-reactor advantages. (author)

  3. Learning power point 2000 easily

    Energy Technology Data Exchange (ETDEWEB)

    Mon, In Su; Je, Jung Suk

    2000-05-15

    This book introduces power point 2000, which gives descriptions what power point is, what we can do with power point 2000, is it possible to install power point 2000 in my computer? Let's run power point, basic of power point such as new presentation, writing letter, using text box, changing font size, color and shape, catching power user, insertion of word art and creating of new file. It also deals with figure, chart, graph, making multimedia file, presentation, know-how of power point for teachers and company workers.

  4. Approaches of Russian oil companies to optimal capital structure

    Science.gov (United States)

    Ishuk, T.; Ulyanova, O.; Savchitz, V.

    2015-11-01

    Oil companies play a vital role in Russian economy. Demand for hydrocarbon products will be increasing for the nearest decades simultaneously with the population growth and social needs. Change of raw-material orientation of Russian economy and the transition to the innovative way of the development do not exclude the development of oil industry in future. Moreover, society believes that this sector must bring the Russian economy on to the road of innovative development due to neo-industrialization. To achieve this, the government power as well as capital management of companies are required. To make their optimal capital structure, it is necessary to minimize the capital cost, decrease definite risks under existing limits, and maximize profitability. The capital structure analysis of Russian and foreign oil companies shows different approaches, reasons, as well as conditions and, consequently, equity capital and debt capital relationship and their cost, which demands the effective capital management strategy.

  5. Preliminary assessment of alternative dry storage methods for the storage of commercial spent nuclear fuel

    International Nuclear Information System (INIS)

    1981-11-01

    This report presents the results of an assessment of the (1) state of technology, (2) licensability, (3) implementation schedule, and (4) costs of alternative dry methods for storage of spent fuel at a reactor location when used to supplement reactor pool storage facilities. The methods of storage that were considered included storage in casks, drywells, concrete silos and air-cooled vaults. The impact of disassembly of spent fuel and storage of consolidated fuel rods was also determined. The economic assessments were made based on the current projected storage requirements of Virginia Electric and Power Company's Surry Station for the period 1985 to 2009, which has two operating pressurized water reactors (824 MWe each). It was estimated that the unit cost for storage of spent fuel in casks would amount to $117/kgU and that such costs for storage in drywells would amount to $137/kgU. However, based on the overall assessment it was concluded both storage methods were equal in merit. Modular methods of storage were generally found to be more economic than those requiring all or most of the facilities to be constructed prior to commencement of storage operations

  6. New technologies deployment for advanced power plants

    International Nuclear Information System (INIS)

    Kiyoshi, Yamauchi

    2007-01-01

    Mitsubishi Heavy Industries, Ltd. (MHI) has been the total engineering and manufacturing company of pressurized water reactors (PWRs) in Japan since the commencement of commercial operations of Mihama Unit 1 of the Kansai Electric Power Company in 1970. Over these decades, MHI has endeavored to develop a broad spread of nuclear technology, from design, manufacturing, and construction, to plant maintenance services. More recently, with the ever rising need for nuclear power generation around the world to prevent global warming and to cope with surging oil prices, MHI is striving to expand its nuclear power business in the world market, such as US-APWR (Advanced Pressurized Water Reactor) in the U.S., as well as to develop technology for advanced reactors and nuclear fuel cycles to ensure energy security in the future. This paper introduces these approaches, especially focused on new technologies deployment for the global needs, and clarifies the current status and future prospects of MHI as the world's leading nuclear company. (author)

  7. Experiments to investigate direct containment heating phenomena with scaled models of the Calvert Cliffs Nuclear Power Plant

    International Nuclear Information System (INIS)

    Blanchat, T.K.; Pilch, M.M.; Allen, M.D.

    1997-02-01

    The Surtsey Test Facility is used to perform scaled experiments simulating High Pressure Melt Ejection accidents in a nuclear power plant (NPP). The experiments investigate the effects of direct containment heating (DCH) on the containment load. The results from Zion and Surry experiments can be extrapolated to other Westinghouse plants, but predicted containment loads cannot be generalized to all Combustion Engineering (CE) plants. Five CE plants have melt dispersal flow paths which circumvent the main mitigation of containment compartmentalization in most Westinghouse PWRs. Calvert Cliff-like plant geometries and the impact of codispersed water were addressed as part of the DCH issue resolution. Integral effects tests were performed with a scale model of the Calvert Cliffs NPP inside the Surtsey test vessel. The experiments investigated the effects of codispersal of water, steam, and molten core stimulant materials on DCH loads under prototypic accident conditions and plant configurations. The results indicated that large amounts of coejected water reduced the DCH load by a small amount. Large amounts of debris were dispersed from the cavity to the upper dome (via the annular gap). 22 refs., 84 figs., 30 tabs

  8. European power struggles. Can the EU's decarbonisation agenda break the state-company axis in the power sector?

    NARCIS (Netherlands)

    Sattich, T; Ydersbond, IM; Scholten, D.J.

    2015-01-01

    Europe’s power system is still marked by a distinct national component, and despite some regions with strongly integrated power systems, electricity supply today still has a largely national basis. Policies to decarbonise the power sector may fundamentally alter this situation, because power

  9. Applying wind turbines and battery storage to defer Orcas Power and Light Company distribution circuit upgrades

    International Nuclear Information System (INIS)

    Zaininger, H.W.; Barnes, P.R.

    1997-03-01

    The purpose of this study is to conduct a detailed assessment of the Orcas Power and Light Company (OPALCO) system to determine the potential for deferring the costly upgrade of the 25-kV Lopez- Eastsound circuit, by the application of a MW-scale wind farm and battery storage facilities as appropriate. Local wind resource data has been collected over the past year and used to determine MW-scale wind farm performance. This hourly wind farm performance data is used with measured hourly Eastsound load data, and recent OPALCO distribution system expansion plans and cost projections in performing this detailed benefit-cost assessment. The OPALCO distribution circuit expansion project and assumptions are described. MW-scale wind farm performance results are given. The economic benefit-cost results for the wind farm and battery storage applications on the OPALCO system using OPALCO system design criteria and cost assumptions are reported. A recalculation is presented of the benefit-cost results for similar potential wind farm and battery storage applications on other utility systems with higher marginal energy and demand costs. Conclusions and recommendations are presented. costs. Conclusions and recommendations are presented

  10. 78 FR 70851 - Airworthiness Directives; The Boeing Company Airplanes

    Science.gov (United States)

    2013-11-27

    ... (EICAS) message that displays ``ENG THRUST (L,R)'' (for Model 787-8 airplanes) or ``ENG (1, 2, 3, or 4... The Boeing Company Model 747-8 and 747-8F series airplanes and Model 787-8 airplanes powered by GEnx...: 202-493-2251. Mail: U.S. Department of Transportation, Docket Operations, M-30, West Building Ground...

  11. 'Nuclearelectrica' and restructuring the electric power sector in Romania

    International Nuclear Information System (INIS)

    Metes, Mircea

    2001-01-01

    The paper presents the first steps of the energy market development in Romania and the impact of this process on 'Nuclearelectrica' company which operates the Cernavoda NPP. The main directions of the power sector liberalization in the European Union are being implemented in Romania. 'Nuclearelectrica' attempts to comply with both economic and safety requirements for nuclear plant operation. So far, the evolution of power market proved the competitiveness of Cernavoda Unit 1 with the existing power producers in Romania. It is stressed that although the 'Hydroelectrica' company sells the MWh at a lower price it cannot cope with top demands higher than 2400 MW. Economical aspects are analyzed and the conclusion is drawn that the situation of 'Nuclearelectrica' company will be significantly changed after the commissioning of Cernavoda Unit 2. (author)

  12. 17 CFR 270.3a-3 - Certain investment companies owned by companies which are not investment companies.

    Science.gov (United States)

    2010-04-01

    ... the definition of the term “investment company” by section 3(b)(1) or 3(b)(2) of the Act (15 U.S.C... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Certain investment companies owned by companies which are not investment companies. 270.3a-3 Section 270.3a-3 Commodity and...

  13. Sectoral panorama: the electric power sector in Europe

    International Nuclear Information System (INIS)

    Mons, L.

    2003-10-01

    This study takes stock on the main european markets to help the electric power companies in their decisions and investments. The first part presents the electric power sector structure in Europe. The second part is devoted to the market evolution for the different european markets (german, french, british, italian and spanish) with an analysis of the retail prices, the competition and the evolution perspectives. The third part presents the highlights in the electric power sector between 2001 and the middle of 2003. The enterprises management and strategies are presented in the fourth part. In the last part the document analyzes the financial performances of the sector and the electric power companies. (A.L.B.)

  14. 18 CFR 366.4 - FERC-65, notification of holding company status, FERC-65A, exemption notification, and FERC-65B...

    Science.gov (United States)

    2010-04-01

    ... meet the definition of a holding company as provided by § 366.1 as of February 8, 2006 shall notify the... of holding company status, FERC-65A, exemption notification, and FERC-65B, waiver notification. 366.4... OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND...

  15. Management quality in spanish nuclear power plant operation

    International Nuclear Information System (INIS)

    Perez de Zabalza Ramos, F.

    1995-01-01

    This paper analyzes the reasons that lead nuclear power plants to require engineering support that is not usual in other types of industrial installations, namely the complexity of the plant and the economic consequences of a possible shutdown. At the time of unit startup, the need to use the services of experienced engineers for the technical support of nuclear power plants induced plant owners to turn to the engineering companies which had participated in the design of the plants. The paper lists the wide range of plant support services which these engineering companies can provide, both from their central offices and on site, especially in the field of change orders and documentation update. The paper also describes the satisfactory development of management parameters in Spanish nuclear power plants both in terms of load factor and comparison of operating and maintenance costs, and how engineering companies have contributed to this achievement, by reducing costs with no loss in the technical quality of their services. Finally, the paper describes how the engineering companies have had to adapt to a shrinking market without losing quality and how they achieved this by diversifying their services. In this context there are two areas of concern. the first area of concern is the competition from certain companies with oversized staff, who attempt to employ them in operation support for nuclear power stations, a field which does not correspond to the training and background of said staff. This could lead to a loss of quality or economic efficiency of nuclear power plants, whose operation up to now has proven satisfactory. The second area of concern is the operator's tendency to use their own resources for engineering support, making more difficult the renewal of human resources and thus leading to a decrease in productivity, and in the transfer of practical and theoretical experience from one plant to another, as well as in the transmission of the latest know

  16. Issues behind Radiation management of workers at Fukushima Nuclear Power Plant of Tokyo Electric Power Company. From the viewpoint of radiation exposure of the ocular lens and the biological effects to the lens

    International Nuclear Information System (INIS)

    Hayashida, Toshiyuki; Sasaki, Hiroshi; Hatsusaka, Natsuko; Hamada, Nobuyuki; Tatsuzaki, Hideo; Akahane, Keiichi; Yokoyama, Sumi

    2017-01-01

    In March 2011, the accident occurred at the Fukushima Daiichi Nuclear Power Plant of Tokyo Electric Power Company. During recovery from critical situations, the radiation dose for some emergency workers exceeded the effective dose limit recommended for an emergency situation. A month after the accident, the International Commission on Radiological Protection issued a statement on tissue reactions recommending significant reduction of the equivalent dose limit to the lens of the eye. Many radiation workers will need to be involved in treatment of water contaminated with radionuclides, fuel debris retrieval, and decommissioning of reactors for a long period of time. Thus, the optimized radiation control in the fields, exposure reduction, prevention of tissue reactions, and reduction of stochastic risks for workers becomes necessary. This paper discusses issues in relation to radiation protection of the ocular lens in such recovery workers, from the viewpoint of radiation exposure of workers, its management, manifestations and mechanisms of the lens effects. (author)

  17. Smart Companies.

    Science.gov (United States)

    Galagan, Patricia A.

    1997-01-01

    Capturing and leveraging knowledge is an important new management trend that is as yet undefined. Some companies are accounting for their intellectual capital and applying it to the company balance sheets. (JOW)

  18. An assessment of the moderating role of employees’ cultural orientations amongst foreign manufacturing multinational companies in Kenya

    Directory of Open Access Journals (Sweden)

    Beatrice A. Dimba

    2013-09-01

    Research purpose: Specifically, this study sought to investigate the extent to which employee cultural orientations moderate the link between SHRM practices and firm performance in large foreign manufacturing multinational companies in Kenya. Motivation for the study: Large foreign multinational companies have generally applied SHRM practices without adaptation when trying to improve employee performance even though resource based perspectives argue for the consideration of employees’ cultural orientations. Research design, approach and method: SHRM practices were conceptualised as independent variables measured through distinct practices. Organisational performance as a dependent variable was measured using constructs of image, interpersonal relations, and product quality. Cultural dimensions adopted for this study were power distance, uncertainty avoidance, individualism or collectivism, and masculinity or femininity. The above conceptual framework was tested by the use of both quantitative and qualitative techniques with data from fifty (50 large foreign multinational companies operating in Kenya. Main findings: Findings indicated that the relationship between SHRM practices and firm performance depend to a greater extent on employee cultural orientations when power distance is considered. Power distance (PD refers to the extent of people accepting that power in institutions and organisations when distributed unequally. The greater the PD, the greater the acceptance of this inequality. Practical/managerial implications: The study supported the notion that the relationship between SHRM practices and firm performance is moderated by power distance through motivation but not by the other three bipolar dimensions namely, Uncertainty Avoidance, Masculinity or Femininity and Individualism or Collectivism. Contribution/value-add: This is the first large-scale empirical article that has focused on the moderating role of employees’ cultural orientations in large

  19. CO2: EDF's competitiveness is due to nuclear power

    International Nuclear Information System (INIS)

    Anon.

    2003-01-01

    The CO 2 emissions of EDF group (EDF-France + EDF-energy (UK) + Hidrocantabrico (Spain) + EnBW (Germany)) soared by 53% in 2002 which is due to the purchase of british and spanish electricity sub-companies using fossil energies. Despite this sharp increase EDF remains one of the most competitive electricity companies in Europe concerning greenhouse gas emissions. EDF group is the first electricity company in Europe, it generates 22% of the electricity produced in E.U and contributes to CO 2 emissions with a rate of 101 Kg CO 2 /MWh which 3 times less than the average rate of 20 other European companies (358 Kg CO 2 /MWh). This result is due to the large part of nuclear power in the French energy mix. The best electricity companies as far as CO 2 emissions are concerned are Statkraft (Norway) with 0 Kg CO 2 /MWh (100% hydrology) and British-energy (U.K) with 75 Kg CO 2 /MWh (75% nuclear power). At the other end we have the DEI company (Greece) with 863 Kg CO 2 /MWh (100% lignite). (A.C.)

  20. Localization of nuclear power plant technology

    International Nuclear Information System (INIS)

    Stiteler, F.Z.; Rudek, T.G.

    1998-01-01

    Asia, and particularly China, has an enormous need for power and must deal with the practicalities of building large base load units. In China, as in other countries, there are limitations on the use of large quantities of fossil fuel. This raises the possibility of turning to nuclear power to satisfy their energy needs. Other issues tend to point to the nuclear option for these growing economies, including economic considerations, environmental concerns, energy independence and raising the technological capabilities of the country. When a country embarks on a nuclear power program with the intention of localizing the technology, a long-term commitment is necessary to achieve this objective. Localization of nuclear technology is not a new phenomenon. The nature of the industry from the early beginnings has always involved transfer of technology when a new country initiated a nuclear power construction program. In fact, most previous experiences with this localization process involved heavy governmental, political and financial support to drive the success of the program. Because of this strong governmental support, only the receiving nation's companies were generally allowed to participate in the local business operations of the technology recipient. What is new and different today is the retreat from heavy financial support by the receiving country's government. This change has created a strong emphasis on cost-effectiveness in the technology transfer process and opportunities for foreign companies to participate in local business activities. ABB is a world-wide company with two parent companies that have been very active over many years in establishing cost-justified local operations throughout the world. Today, ABB has become the largest electrical engineering company in the world with respected local operations in nearly every country. Lessons learned by ABB in their world-wide localization initiatives are being applied to the challenge of cost

  1. INDICATORS USED IN ANALYSING EMPLOYEES’ BEHAVIOUR IN A COMPANY

    Directory of Open Access Journals (Sweden)

    LĂPĂDUŞI MIHAELA LOREDANA

    2014-10-01

    Full Text Available The acquisition and maintenance of a competitive advantage in a market economy is supported primarily by the quality of human resources, staff’s individual and collective skills and managing team’s skills. The performance of the company, its capacity and power to cope with the changes and demands of the market and the competitive environment depend on providing with human material and financial resources as well as on how to combine and manage them. In analysing employees’ behaviour in a company can be considered a series of circumstances and be used a multitude of factors, but from economic and financial point of view the following indicators can be used: working time, staff mobility and conflict in work relations. The general theme which will represent the object of this research refers to the behavior of the personnel of a company regarding the perspective of the three indicators which will be presented and anylised in this article. The results of this research will confirm the hyphotesis that the performance of a company and its capacity of coping with a competitive environment depends to the greatest extent of the way are managed and used the human, material and financial resources and will contribute at streghthening the conviction that the human resources remain always the first strategic resources of a company and unique in what regards their potential of increase, influence and development. The purpose of this article is to highlight the fact that the attainment of an objective by a company depends on the one hand on the company management,its employees and partners, and on the other hand by external and internal circumstances. Through the interaction of the two components it could be seen the manifestation of employees’ behaviour influenced mainly by the following factors: working hours, mobility and conflict.

  2. Safety evaluation report related to the operation of Midland Plant, Units 1 and 2. Docket Nos. 50-329 and 50-330, Consumers Power Company

    International Nuclear Information System (INIS)

    1982-05-01

    The Safety Evaluation Report for the application filed by the Consumers Power Company, as applicant and owner, for a license to operate the Midland Plant Units 1 and 2 (Docket Nos. 50-329 and 50-330), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located near the city of Midland in Midland County, Michigan. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  3. Competing with giants. Survival strategies for local companies in emerging markets.

    Science.gov (United States)

    Dawar, N; Frost, T

    1999-01-01

    The arrival of a multinational corporation often looks like a death sentence to local companies in an emerging market. After all, how can they compete in the face of the vast financial and technological resources, the seasoned management, and the powerful brands of, say, a Compaq or a Johnson & Johnson? But local companies often have more options than they might think, say the authors. Those options vary, depending on the strength of globalization pressures in an industry and the nature of a company's competitive assets. In the worst case, when globalization pressures are strong and a company has no competitive assets that it can transfer to other countries, it needs to retreat to a locally oriented link within the value chain. But if globalization pressures are weak, the company may be able to defend its market share by leveraging the advantages it enjoys in its home market. Many companies in emerging markets have assets that can work well in other countries. Those that operate in industries where the pressures to globalize are weak may be able to extend their success to a limited number of other markets that are similar to their home base. And those operating in global markets may be able to contend head-on with multinational rivals. By better understanding the relationship between their company's assets and the industry they operate in, executives from emerging markets can gain a clearer picture of the options they really have when multinationals come to stay.

  4. Results and insights of a level-1 internal event PRA of a PWR during mid-loop operations

    International Nuclear Information System (INIS)

    Chu, T.L.; Musicki, Z.; Kohut, P.

    1993-01-01

    Traditionally, probabilistic risk assessments (PRA) of severe accidents in nuclear power plants have considered initiating events potentially occurring only during full power operation. Some previous screening analysis that were performed for other modes of operation suggested that risks during those modes were small relative to full power operation. However, more recent studies and operational experience have implied that accidents during low power and shutdown could be significant contributors to risk. The objective of this paper is to present the approach utilized in the level-1 PRA for the Surry plant, and discuss the results obtained. A comparison of the results with those of other shutdown studies is provided. Relevant safety issues such as plant and hardware configurations, operator training, and instrumentation and control is discussed

  5. Resolution 566/012. It is allowed to MELAHUA S.A company the generation by wind power source in Rocha province 7th Catastral section, as well as the connection to the Interconnected National System

    International Nuclear Information System (INIS)

    2012-01-01

    This resolution authorizing the power generation using the wind as a primary source. The company who presented this project was MALAHUA S.A with the proposal to instal an electrical plant in Maldonado province. This authorization was according to the Electric Wholesale Market regulation

  6. Essential Power Systems Workshop - OEM Perspective

    International Nuclear Information System (INIS)

    Bill Gouse

    2001-01-01

    In California, idling is largely done for climate control. This suggests that climate control devices alone could be used to reduce idling. Line-haul truck drivers surveyed require an average of 4-6 kW of power for a stereo, CB radio, light, refrigerator, and climate control found in the average truck. More power may likely be necessary for peak power demands. The amount of time line-haul trucks reported to have stopped is between 25 and 30 hours per week. It was not possible to accurately determine from the pilot survey the location, purpose, and duration of idling. Consulting driver logs or electronically monitoring trucks could yield more accurate data, including seasonal and geographic differences. Truck drivers were receptive to idling alternatives. Two-thirds of truck drivers surveyed support a program to reduce idling. Two-thirds of drivers reported they would purchase idling reduction technologies if the technology yielded a payback period of two years or less. Willingness to purchase auxiliary power units appears to be higher for owner-operators than for company drivers. With a 2-year payback period, 82% of owner- operators would be willing to buy an idle- reducing device, while 63% of company drivers thought their company would do the same. Contact with companies is necessary to discern whether this difference between owner- operators and companies is true or simply due to the perception of the company drivers. Truck stops appear to be a much more attractive option for electrification than rest areas by a 48% to 21% margin. Much of this discrepancy may be due to perceived safety problems with rest areas. This survey did not properly differentiate between using these areas for breaks or overnight. The next, full survey will quantify where the truck drivers are staying overnight, where they go for breaks, and the duration of time they spend at each place. The nationwide survey, which is in progress, will indicate how applicable the results are to the US in

  7. MERGER ACCOUTING FOR COMPANIES

    OpenAIRE

    SUCIU GHEORGHE

    2014-01-01

    Companies, especially nowadays, are characterized through great mobility, fast circulation of capital, occurring in their chase for profit. In this context, companies look for alliances, economical and political assistance. These objectives can materialize through merging of companies. The merger can be internal (between Romanian companies) or transboundary, which includes foreign companies. In order to correctly reflect these events, the merger operations must be regulated and mu...

  8. Safety evaluation report related to the operation of Grand Gulf Nuclear Station, Units 1 and 2. Dockets Nos. 50-416 and 50-417, Mississippi Power and Light Company; Middle South Energy, Inc., South Mississippi Electric Power Association

    International Nuclear Information System (INIS)

    1982-06-01

    Supplement 2 to the Safety Evaluation Report for Mississippi Power and Light Company, et. al, joint application for licenses to operate the Grand Gulf Nuclear Station, Units 1 and 2, located on the east bank of the Mississippi River near Port Gibson, in Claiborne County, Mississippi, has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. This supplement reports the status of certain items that had not been resolved at the time of publication of the Safety Evaluation Report

  9. 18 CFR 260.9 - Reports by natural gas pipeline companies on service interruptions and damage to facilities.

    Science.gov (United States)

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Reports by natural gas..., NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.9 Reports by natural gas pipeline companies on service interruptions and damage to facilities. (a)(1) Every natural gas company must report to the...

  10. Safety evaluation report related to the operation of Catawba Nuclear Station, Units 1 and 2. Docket Nos. 50-413 and 50-414, Duke Power Company, et al

    International Nuclear Information System (INIS)

    1983-02-01

    The Safety Evaluation Report for the application filed by Duke Power Company, North Carolina Municipal Power Agency Number 1, North Carolina Electric Membership Corporation, and Saluda River Electric Cooperative, Inc. as applicants and owners, for licenses to operate the Catawba Nuclear Station, Units 1 and 2 (Docket Nos. 50-413 and 50-414), has been prepared by the Office of Nuclear Reactor Regulation of the US Nuclear Regulatory Commission. The facility is located in York County, South Carolina, approximately 9.6 km (6 mi) north of Rock Hill and adjacent to Lake Wylie. Subject to favorable resolution of the items discussed in this report, the staff concludes that the facility can be operated by the applicant without endangering the health and safety of the public

  11. Development and optimization of power plant concepts for local wet fuels

    Energy Technology Data Exchange (ETDEWEB)

    Raiko, M.O.; Gronfors, T.H.A. [Fortum Energy Solutions, Fortum (Finland); Haukka, P. [Tampere University of Technology (Finland)

    2003-01-01

    Many changes in business drivers are now affecting power-producing companies. The power market has been opened up and the number of locally operating companies has increased. At the same time the need to utilize locally produced biofuels is increasing because of environmental benefits and regulations. In this situation, power-producing companies have on focus their in-house skills for generating a competitive edge over their rivals, such as the skills needed for developing the most economical energy investments for the best-paying customer for the local biomass producers. This paper explores the role of optimization in the development of small-sized energy investments. The paper provides an overview on a new design process for power companies for improved use of in-house technical and business expertise. As an example, illustrative design and optimization of local wet peat-based power investment is presented. Three concept alternatives are generated. Only power plant production capacity and peat moisture content are optimized for all alternatives. Long commercial experience of using peat as a power plant fuel in Finland can be transferred to bioenergy investments. In this paper, it is shown that conventional technology can be feasible for bioenergy production even in quite small size (below 10 MW). It is important to optimize simultaneously both the technology and the two businesses, power production and fuel production. Further, such high moisture content biomass as sludge, seaweed, grass, etc. can be economical fuels, if advanced drying systems are adopted in a power plant. (author)

  12. Quality assurance system in electric power companies in Japan, (2)

    International Nuclear Information System (INIS)

    Hamaguchi, Shun-ichi

    1980-01-01

    The organization for the quality assurance in nuclear power plants of Kansai Electric Power Co., Inc. is introduced. It is still in investigation stage what quality assurance (QA) organization and system is the best. The QA investigation project team was organized in the form directly supervised by the Office of President. The purpose of QA in operation is to maintain the functions of power plants in good condition over the lifetime of the power plants after starting the operation, and the QA is divided into the following five items: (1) running operation, (2) check-up and maintenance, (3) in-service testing and inspection, (4) regular inspection, (5) general application control. The purposes and works to be implemented for these items are listed in a table, and explained in detail. The quality control in regular inspection is described about 4 stages is purchase order and contract, design, construction, and adjusting operation. Also further improvement of QA in operating nuclear power plants by implementing the next items has been decided to make the most of the teachings in the accident of Three Mile Island plant. (1) Reinforcement of operation management system, (2) completion of the training for operators, (3) clarification of the command system for operational control, and (4) change of installations and review of application. As seen in the above description, the important tasks in QA activities are the matching to the existing installations and the adjustment of interfaces with the equipments in operation. (Wakatsuki, Y.)

  13. Automatic Power Factor Correction Using Capacitive Bank

    OpenAIRE

    Mr.Anant Kumar Tiwari,; Mrs. Durga Sharma

    2014-01-01

    The power factor correction of electrical loads is a problem common to all industrial companies. Earlier the power factor correction was done by adjusting the capacitive bank manually [1]. The automated power factor corrector (APFC) using capacitive load bank is helpful in providing the power factor correction. Proposed automated project involves measuring the power factor value from the load using microcontroller. The design of this auto-adjustable power factor correction is ...

  14. Public power costs less

    International Nuclear Information System (INIS)

    Moody, D.

    1993-01-01

    The reasons why residential customers of public power utilities paid less for power than private sector customers is discussed. Residential customers of investor-owned utilities (IOU's) paid average rates that were 28% above those paid by customers by possibly owned systems during 1990. The reasons for this disparity are that management costs faced by public power systems are below those of private power companies, indicating a greater efficiency of management among public power systems, and customer accounts expenses averaged $33.00 per customer for publicly owned electric utilities compared to $39.00 per customer for private utilities

  15. Financing nuclear power

    International Nuclear Information System (INIS)

    Sheriffah Noor Khamseah Al-Idid Syed Ahmad Idid

    2009-01-01

    Global energy security and climate change concerns sparked by escalating oil prices, high population growth and the rapid pace of industrialization are fueling the current interest and investments in nuclear power. Globally, a significant number policy makers and energy industry leaders have identified nuclear power as a favorable alternative energy option, and are presently evaluating either a new or an expanded role for nuclear power. The International Atomic Energy Agency (IAEA) has reported that as of October 2008, 14 countries have plans to construct 38 new nuclear reactors and about 100 more nuclear power plants have been written into the development plans of governments for the next three decades. Hence as new build is expected to escalate, issues of financing will become increasingly significant. Energy supply, including nuclear power, considered as a premium by government from the socio-economic and strategic perspective has traditionally been a sector financed and owned by the government. In the case for nuclear power, the conventional methods of financing include financing by the government or energy entity (utility or oil company) providing part of the funds from its own resources with support from the government. As national financing is, as in many cases, insufficient to fully finance the nuclear power plants, additional financing is sourced from international sources of financing including, amongst others, Export Credit Agencies (ECAs) and Multilateral Development Institutions. However, arising from the changing dynamics of economics, financing and business model as well as increasing concerns regarding environmental degradation , transformations in methods of financing this energy sector has been observed. This paper aims to briefly present on financing aspects of nuclear power as well as offer some examples of the changing dynamics of financing nuclear power which is reflected by the evolution of ownership and management of nuclear power plants

  16. Open Source Telecommunication Companies

    Directory of Open Access Journals (Sweden)

    Peter Liu

    2007-08-01

    Full Text Available Little is known about companies whose core business is selling telecommunications products that lever open source projects. Open source telecommunications (OST companies operate in markets that are very different from typical software product markets. The telecommunications market is regulated, vertically integrated, and proprietary designs and special chips are widely used. For a telecommunications product to be useful, it must interact with both access network products and core network products. Due to specifications in Service Agreements Levels, penalties for failures of telecommunications products are very high. This article shares information that is not widely known, including a list of OST companies and the open source projects on which they depend, the size and diversity of venture capital investment in OST companies, the nature of the commercial product-open source software and company-project relationships, ways in which OST companies make money, benefits and risks of OST companies, and competition between OST companies. Analysis of this information provides insights into the ways in which companies can build business models around open source software. These findings will be of interest to entrepreneurs, top management teams of incumbent companies that sell telecommunications products, and those who care about Ontario's ability to compete globally.

  17. Radiation risk perception by radiation professionals. Survey results just before the radiological accident at the Tokyo Electric Power Company Fukushima Daiichi nuclear power plant

    International Nuclear Information System (INIS)

    Miura, Miwa; Hayashida, Rika; Takao, Hideaki; Matsuda, Naoki; Ono, Koji

    2013-01-01

    From October to December 2010, just before the radiological accident at the Tokyo Electric Power Company Fukushima Daiichi nuclear power plant, 71 radiation professionals belonging to the radiation facilities in Japan were asked what they consider as a 'safe' dose of radiation for themselves, their spouse, parents, children, brothers and friends. Although the 'safe' dose varied widely from less than 1 mSv/y to higher than 100 mSv/y, the average dose was 35.6 mSv/y that was around the middle point between the exposure dose limits for annual average (20 mSv/y) and for any single year (50 mSv/y). Similar results were obtained from another surveys for the members of Japan Radioisotope Association (36.9 mSv/y) and for the Oita Prefectural Hospital (36.8 mSv/y). Among the family members and friends, the minimum average 'safe' dose was 8.5 mSv/y for children, to whom 50% of responders claimed the 'safe' dose less than 1 mSv. Gender, age and specialty of the responder also affected the 'safe' dose. These findings suggest that the perception of radiation risk varies widely and that the legal exposure dose limit derived from the regulatory science may act as an anchor of safety even in radiation professionals. The different level of risk perception for different target groups in radiation professionals appears similar to those in non-professional whole population. The gap between these characteristics of real radiation professionals and the generally accepted picture of radiation professionals might take a part in a state of confusion after the radiological accident. (author)

  18. The management strategy of energetic companies before new businesses: CESP - a case study; A postura empresarial de empresas energeticas diante de novos negocios: CESP - um estudo de caso

    Energy Technology Data Exchange (ETDEWEB)

    Prado Junior, Fernando Amaral de Almeida

    1994-12-01

    This thesis focuses the new challenges which the Brazilian electric power companies have been facing towards the new market requirements. Special emphasis is given to: organizational theory; Brazilian electric power industry history; and, comparative analysis of the Brazilian electric power system regulation and legislation. A case study is presented based on the electric power company of Sao Paulo State - Southeast Brazil 60 refs., 21 figs., 37 tabs.

  19. IMPLEMENTATION OF LEAN MANUFACTURING IN FISH CANNING COMPANY: A CASE STUDY OF A CANNED SARDINES PRODUCTION COMPANY IN MOROCCO

    Directory of Open Access Journals (Sweden)

    I. Idrıssi

    2015-12-01

    Full Text Available Lean is a powerful tool, which can bring significant benefit to manufacturing industries by creating value through reduction of waste. Although the lean concept has become very popular in mass production industries such as the automotive industry, more recently the concept has been adopted in different batch processing industries and service sectors. The application of lean tools into the food processing industry has not received the same level of attention compared to the traditional manufacturing industries. The paper discusses how the lean concept could be applied to a fish manufacturing company. The paper first presents the lean concept tools. The empirical section discusses how a case company, operating as a contract manufacturer in the food industry, has applied the lean production concept and tools. In the case study, three analysis tools are examined and the structures of demand chains of different customers are presented. The delivery times will decrease and more flexibility will be needed from the contract manufacturer. The case study shows that much movement is possible toward the lean supply chain and partnership-based cooperation. By implementing the lean concept, food companies can increase customer value through cost reduction or through provision of additional value-enhanced services.

  20. Tariffs on power supply and prices of electricity per 1st January 1994

    International Nuclear Information System (INIS)

    1994-04-01

    The document gives a survey of the most usual types of tariffs connected with the Danish electric-power distribution companies and the prices, valid per January 1st, 1994, set by individual companies and also the cost to consumers of connection to the supply network. A survey of prices set by power plant administrators with regard to the distribution companies is also included in addition to a summary of the modes of calculation in connection with wind turbines not owned by the electricity companies and descriptions of models for calculations related to decentral and industrial plants. Local conditions such as structure, economy etc. must be taken into consideration when comparing prices set by companies in several different areas. (AB)