WorldWideScience

Sample records for company geothermal project

  1. Great Western Malting Company geothermal project, Pocatello, Idaho. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Christensen, N.T.; McGeen, M.A.; Corlett, D.F.; Urmston, R.

    1981-12-23

    The Great Western Malting Company recently constructed a barley malting facility in Pocatello, Idaho, designed to produce 6.0 million bushels per year of brewing malt. This facility uses natural gas to supply the energy for germination and kilning processes. The escalating cost of natural gas has prompted the company to look at alternate and more economical sources of energy. Trans Energy Systems has investigated the viabiity of using geothermal energy at the new barley processing plant. Preliminary investigations show that a geothermal resource probably exists, and payback on the installation of a system to utilize the resource will occur in under 2 years. The Great Western Malting plant site has geological characteristics which are similar to areas where productive geothermal wells have been established. Geological investigations indicate that resource water temperatures will be in the 150 to 200/sup 0/F range. Geothermal energy of this quality will supply 30 to 98% of the heating requirements currently supplied by natural gas for this malting plant. Trans Energy Systems has analyzed several systems of utilizing the geothermal resource at the Great Western barley malting facility. These systems included: direct use of geothermal water; geothermal energy heating process water through an intermediary heat exchanger; coal or gas boosted geothermal systems; and heat pump boosted geothermal system. The analysis examined the steps that are required to process the grain.

  2. Hawaii geothermal project

    Science.gov (United States)

    Kamins, R. M.

    1974-01-01

    Hawaii's Geothermal Project is investigating the occurrence of geothermal resources in the archipelago, initially on the Island of Hawaii. The state's interest in geothermal development is keen, since it is almost totally dependent on imported oil for energy. Geothermal development in Hawaii may require greater participation by the public sector than has been true in California. The initial exploration has been financed by the national, state, and county governments. Maximization of net benefits may call for multiple use of geothermal resources; the extraction of by-products and the application of treated effluents to agricultural and aquacultural uses.

  3. SPP retains interest in geothermal project

    International Nuclear Information System (INIS)

    Anon

    2007-01-01

    Slovensky plynarensky priemysel (SPP) officially indicated that it intended to drop its project of using geothermal energy in the Kosicka kotlina. This spring it published an advert that it was looking for a company that wished to acquire a majority stake in the company, Geoterm Kosice. The company was established to commercially develop this geothermal source. But it seems SPP does not want to drop the project completely. It has kept some important cards, such as control over the land where the boreholes are located Any company that wants to use geothermal energy needs a ruling issued by the Ministry of Environment defining the exploration area. Geothermal sources were found in the villages of Durkov, Svinica, Bidovce and Olsovany. Not so long ago the area was assigned to Geoterm but from May 9 the area can be explored by Slovgeoterm. Both companies have the same majority shareholder - SPP. It controls 96% of Geoterm shares and 50% of Slovgeoterm. So far it has only officially announced its intention to sell the Geoterm shares. But as far as the use of the geothermal resource is concerned since May Slovgeoterm has played a key role.The company focuses on the utilization of geothermal energy. In addition to the project in the Kosice region, it has also participated in a project to heat more than a thousand flats using geothermal water in Galanta and a project to heat greenhouses in Podhajske. There are also other geothermal projects running in Presov and Michalovce. Icelandic company, Enex, with the same specialisation controls 28% of the company and a further 20% is owned by the investment group, NEFCO based in Helsinki. Two percent of the company is owned by its general director and the general proxy of Geoterm, Otto Halas. And so without the agreement of this company no-one can start any activities related to the utilization of geothermal energy. (authors)

  4. Geothermal Small Business Workbook [Geothermal Outreach and Project Financing

    Energy Technology Data Exchange (ETDEWEB)

    Elizabeth Battocletti

    2003-05-01

    --the geothermal entrepreneur, small company, or project developer--step-by-step through the process needed to structure a business and financing plan for a small geothermal project; and Help you develop a financing plan that can be adapted and taken to potential financing sources. The Workbook will not: Substitute for financial advice; Overcome the high exploration, development, and financing costs associated with smaller geothermal projects; Remedy the lack of financing for the exploration stage of a geothermal project; or Solve financing problems that are not related to the economic soundness of your project or are caused by things outside of your control.

  5. Electric utility companies and geothermal power

    Science.gov (United States)

    Pivirotto, D. S.

    1976-01-01

    The requirements of the electric utility industry as the primary potential market for geothermal energy are analyzed, based on a series of structured interviews with utility companies and financial institution executives. The interviews were designed to determine what information and technologies would be required before utilities would make investment decisions in favor of geothermal energy, the time frame in which the information and technologies would have to be available, and the influence of the governmental politics. The paper describes the geothermal resources, electric utility industry, its structure, the forces influencing utility companies, and their relationship to geothermal energy. A strategy for federal stimulation of utility investment in geothermal energy is suggested. Possibilities are discussed for stimulating utility investment through financial incentives, amelioration of institutional barriers, and technological improvements.

  6. Environmental Assessment Lakeview Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    Treis, Tania [Southern Oregon Economic Development Department, Medford, OR (United States)

    2012-04-30

    The Town of Lakeview is proposing to construct and operate a geothermal direct use district heating system in Lakeview, Oregon. The proposed project would be in Lake County, Oregon, within the Lakeview Known Geothermal Resources Area (KGRA). The proposed project includes the following elements: Drilling, testing, and completion of a new production well and geothermal water injection well; construction and operation of a geothermal production fluid pipeline from the well pad to various Town buildings (i.e., local schools, hospital, and Lake County Industrial Park) and back to a geothermal water injection well. This EA describes the proposed project, the alternatives considered, and presents the environmental analysis pursuant to the National Environmental Policy Act. The project would not result in adverse effects to the environment with the implementation of environmental protection measures.

  7. Engineered Geothermal System Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Petty, Susan

    2014-06-19

    In June 2009, AltaRock Energy began field work on a project supported by the U.S. Department of Energy entitled “Use of Multiple Stimulations to Improve Economics of Engineered Geothermal Systems in Shallow High Temperature Intrusives.” The goal of the project was to develop an Engineered Geothermal System (EGS) in the portion of The Geysers geothermal field operated by the Northern California Power Agency (NCPA). The project encountered several problems while deepening Well E-7 which culminated in the suspension of field activities in September 2009. Some of the problems encountered are particular to The Geysers area, while others might be encountered in any geothermal field, and they might be avoided in future operations.

  8. Colorado State Capitol Geothermal project

    Energy Technology Data Exchange (ETDEWEB)

    Shepherd, Lance [Colorado Department of Personnel and Adminstration, Denver, CO (United States)

    2016-04-29

    Colorado State Capitol Geothermal Project - Final report is redacted due to space constraints. This project was an innovative large-scale ground-source heat pump (GSHP) project at the Colorado State Capitol in Denver, Colorado. The project employed two large wells on the property. One for pulling water from the aquifer, and another for returning the water to the aquifer, after performing the heat exchange. The two wells can work in either direction. Heat extracted/added to the water via a heat exchanger is used to perform space conditioning in the building.

  9. Geothermal energy

    International Nuclear Information System (INIS)

    Rummel, F.; Kappelmeyer, O.; Herde, O.A.

    1992-01-01

    Objective of this brochure is to present the subject Geothermics and the possible use of geothermal energy to the public. The following aspects will be refered to: -present energy situation -geothermal potential -use of geothermal energy -environemental aspects -economics. In addition, it presents an up-dated overview of geothermal projects funded by the German government, and a list of institutions and companies active in geothermal research and developments. (orig./HP) [de

  10. Economic analysis of geothermal projects

    International Nuclear Information System (INIS)

    Allegrini, G.; Cappetti, G.

    1990-01-01

    This paper reports on the high investment costs typical of geothermal energy which necessitate careful verification of the resource before embarking on a development project. Moreover, they require the adoption of all strategies aimed at limiting investment costs and times as much as possible in order to contain the tie-up of capital in the construction activities. For this purpose a series of choices has been made regarding the constructional standardization of plants and the adoption of organizational criteria that allow cost reduction and better management of the various phases of a development project. A computer program has also been developed which makes it possible to examine the bearing the various parameters relating to the reservoir characteristics have on the cost of the kWh and to optimize resource utilization for the various activities of a development project

  11. Honey Lake Geothermal Project, Lassen County, California

    Science.gov (United States)

    1984-11-01

    The drilling, completion, and testing of deep well WEN-2 for a hybrid electric power project which will use the area's moderate temperature geothermal fluids and locally procured wood fuel is reported. The project is located within the Wendel-Amedee Known Geothermal Resource Area.

  12. Application for Underground Injection Control Permit for the PUNA Geothermal Venture Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1989-06-01

    Puna Geothermal Venture (PGV) plans to construct and operate the 25 MW Puna Geothermal Venture Project in the Puna District of the Island of Hawaii. The project will drill geothermal wells within a dedicated 500-acre project area, use the produced geothermal fluid to generate electricity for sale to the Hawaii Electric Light Company for use on the Island of Hawaii, and inject all the produced geothermal fluids back into the geothermal reservoir. Since the project will use injection wells, it will require an Underground Injection Control (UIC) permit from the Drinking Water Section of the State of Hawaii Department of Health. The PGV Project is consistent with the State and County of Hawaii's stated objectives of providing energy self-sufficiency and diversifying Hawaii's economic base. The project will develop a new alternate energy source as well as provide additional information about the nature of the geothermal resource.

  13. Geothermal Money Book [Geothermal Outreach and Project Financing

    Energy Technology Data Exchange (ETDEWEB)

    Elizabeth Battocletti

    2004-02-01

    Small business lending is big business and growing. Loans under $1 million totaled $460 billion in June 2001, up $23 billion from 2000. The number of loans under $100,000 continued to grow at a rapid rate, growing by 10.1%. The dollar value of loans under $100,000 increased 4.4%; those of $100,000-$250,000 by 4.1%; and those between $250,000 and $1 million by 6.4%. But getting a loan can be difficult if a business owner does not know how to find small business-friendly lenders, how to best approach them, and the specific criteria they use to evaluate a loan application. This is where the Geothermal Money Book comes in. Once a business and financing plan and financial proposal are written, the Geothermal Money Book takes the next step, helping small geothermal businesses locate and obtain financing. The Geothermal Money Book will: Explain the specific criteria potential financing sources use to evaluate a proposal for debt financing; Describe the Small Business Administration's (SBA) programs to promote lending to small businesses; List specific small-business friendly lenders for small geothermal businesses, including those which participate in SBA programs; Identify federal and state incentives which are relevant to direct use and small-scale (< 1 megawatt) power generation geothermal projects; and Provide an extensive state directory of financing sources and state financial incentives for the 19 states involved in the GeoPowering the West (GPW). GPW is a U.S. Department of Energy-sponsored activity to dramatically increase the use of geothermal energy in the western United States by promoting environmentally compatible heat and power, along with industrial growth and economic development. The Geothermal Money Book will not: Substitute for financial advice; Overcome the high exploration, development, and financing costs associated with smaller geothermal projects; Remedy the lack of financing for the exploration stage of a geothermal project; or Solve

  14. Mt. Apo geothermal project : a learning experience in sustainable development

    International Nuclear Information System (INIS)

    Ote, Leonardo M.; De Jesus, Agnes C.

    1997-01-01

    The Mt. Apo geothermal project, a critical component of the Philippine energy program met stiff opposition from 1988-1991. Seemingly unresolvable legal, environmental and cultural issues between the government developer, the Philippine National Oil Company-Energy Development Corporation (PNOC-EDC) and various affected sectors delayed the project for two years. The paper discusses the efforts undertaken by the developer to resolve these conflicts through a series of initiatives that transformed the project into a legally, environmentally and socially acceptable project. Lastly, the PNOC-EDC experience has evolved a new set of procedures for the environmental evaluation of development project in the Philippines. (author)

  15. Greece, Milos Island Geothermal Project

    International Nuclear Information System (INIS)

    Delliou, E.E.

    1990-01-01

    On Milos island (Aegean Sea) a high enthalpy, water dominated geothermal field of high salinity exists. At 1985, a 2MW geothermoelectric pilot plant was installed on the island. This plant has been provided by Mitsubishi Heavy Industries of Japan under a contract with Public Power Corporation of Greece. Due to high salinity of the geothermal fluid, unforeseen problems (scaling mainly) arisen in both steam and brine cycles. As a consequence, the operation (trial mainly) of the power plant have been interrupted several times for long periods, in order to identify the arisen, each time, problems and find the most appropriate technical solution. The above fact, as well as, some unfortunate coincidences described in this paper, led Milos people to react against geothermal development in their island. The sequence of the events, technical and non-technical, their approach and the relevant conclusions are reported in this presentation

  16. Fairbanks Geothermal Energy Project Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Karl, Bernie [CHSR,LLC Owner

    2013-05-31

    The primary objective for the Fairbanks Geothermal Energy Project is to provide another source of base-load renewable energy in the Fairbanks North Star Borough (FNSB). To accomplish this, Chena Hot Springs Resort (Chena) drilled a re-injection well to 2700 feet and a production well to 2500 feet. The re-injection well allows a greater flow of water to directly replace the water removed from the warmest fractures in the geothermal reservoir. The new production will provide access to warmer temperature water in greater quantities.

  17. Geothermal Mill Redevelopment Project in Massachusetts

    Energy Technology Data Exchange (ETDEWEB)

    Vale, A.Q.

    2009-03-17

    Anwelt Heritage Apartments, LLC redeveloped a 120-year old mill complex into a mixed-use development in a lower-income neighborhood in Fitchburg, Massachusetts. Construction included 84 residential apartments rented as affordable housing to persons aged 62 and older. The Department of Energy (“DOE”) award was used as an essential component of financing the project to include the design and installation of a 200 ton geothermal system for space heating and cooling.

  18. Geothermal energy in Italy - its importance, potential and projects

    International Nuclear Information System (INIS)

    Berger, W.

    2005-01-01

    This article discusses the perspectives for the use of geothermal energy in Italy. Starting with an overview of the principles of the use of geothermal energy in general, the article goes on to review Italy's geothermal resources and their relevance to energy supply. Figures are given on the political situation in Italy concerning energy and the rapidly increasing demands made on electricity supply. Political support for renewable energy in Italy is looked at and models for financing projects are examined. Examples of geothermal energy projects are given and the perspectives for further developments in this industry are looked at

  19. Computational methods for planning and evaluating geothermal energy projects

    International Nuclear Information System (INIS)

    Goumas, M.G.; Lygerou, V.A.; Papayannakis, L.E.

    1999-01-01

    In planning, designing and evaluating a geothermal energy project, a number of technical, economic, social and environmental parameters should be considered. The use of computational methods provides a rigorous analysis improving the decision-making process. This article demonstrates the application of decision-making methods developed in operational research for the optimum exploitation of geothermal resources. Two characteristic problems are considered: (1) the economic evaluation of a geothermal energy project under uncertain conditions using a stochastic analysis approach and (2) the evaluation of alternative exploitation schemes for optimum development of a low enthalpy geothermal field using a multicriteria decision-making procedure. (Author)

  20. Geothermal policy project. Quarterly report, March 1-May 30, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-06-01

    Efforts continued to initiate geothermal and groundwater heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Minnesota and South Carolina have agreed to a groundwater heat pump study, and Maryland and Virginia have agreed to a follow-up geothermal study in 1980. Follow-up contacts were made with several other existing project states and state meetings and workshops were held in eleven project states. Two generic documents were prepared, the Geothermal Guidebook and the Guidebook to Groundwater Heat Pumps, in addition to several state-specific documents.

  1. Decree from July 25, 2015 related to general prescriptions applicable to geothermal activities of minor importance. Decree from July 25, 2015 related to the certification of drilling companies intervening in geothermal energy of minor importance. Decree from July 25, 2015 related to the zoning map in the field minor importance geothermal energy

    International Nuclear Information System (INIS)

    Delduc, P.; Blanc, P.; Michel, L.

    2015-01-01

    These decrees concern various actors of the geothermal sector in the case of projects and works of minor importance. The first one defines general technical prescriptions applicable to a geothermal site of minor importance, the conditions related to the implantation of a geothermal installation of minor importance, measures to be implemented when performing geothermal works and when stopping its exploitation, control and maintenance modalities in order to prevent risks for the environment and to preserve water resource quality. The second decree defines measures to be implemented by drilling companies in the case of geothermal projects of minor importance. The third decree defines the map of geothermal areas of minor importance, specifies the map elaboration methodology and its reviewing modalities

  2. Geothermal Energy Research and Development Program; Project Summaries

    Energy Technology Data Exchange (ETDEWEB)

    None

    1994-03-01

    This is an internal DOE Geothermal Program document. This document contains summaries of projects related to exploration technology, reservoir technology, drilling technology, conversion technology, materials, biochemical processes, and direct heat applications. [DJE-2005

  3. Geothermal policy project. Quarterly report, June 1-August 31, 1980

    Energy Technology Data Exchange (ETDEWEB)

    Connor, T.D.

    1980-11-01

    Efforts continued to initiate geothermal and water source heat pump study activities in newly selected project states and to carry forward policy development in existing project states. Follow-up contacts were made with several project states, and state meetings and workshops were held in nine project states. Two state-specific documents were prepared during this reporting period, for Nevada and Wyoming.

  4. South Dakota Geothermal Commercialization Project. Final report, July 1979-October 1985

    Energy Technology Data Exchange (ETDEWEB)

    Wegman, S.

    1985-01-01

    This report describes the activities of the South Dakota Energy Office in providing technical assistance, planning, and commercialization projects for geothermal energy. Projects included geothermal prospect identification, area development plans, and active demonstration/commercialization projects. (ACR)

  5. The Pawsey Supercomputer geothermal cooling project

    Science.gov (United States)

    Regenauer-Lieb, K.; Horowitz, F.; Western Australian Geothermal Centre Of Excellence, T.

    2010-12-01

    The Australian Government has funded the Pawsey supercomputer in Perth, Western Australia, providing computational infrastructure intended to support the future operations of the Australian Square Kilometre Array radiotelescope and to boost next-generation computational geosciences in Australia. Supplementary funds have been directed to the development of a geothermal exploration well to research the potential for direct heat use applications at the Pawsey Centre site. Cooling the Pawsey supercomputer may be achieved by geothermal heat exchange rather than by conventional electrical power cooling, thus reducing the carbon footprint of the Pawsey Centre and demonstrating an innovative green technology that is widely applicable in industry and urban centres across the world. The exploration well is scheduled to be completed in 2013, with drilling due to commence in the third quarter of 2011. One year is allocated to finalizing the design of the exploration, monitoring and research well. Success in the geothermal exploration and research program will result in an industrial-scale geothermal cooling facility at the Pawsey Centre, and will provide a world-class student training environment in geothermal energy systems. A similar system is partially funded and in advanced planning to provide base-load air-conditioning for the main campus of the University of Western Australia. Both systems are expected to draw ~80-95 degrees C water from aquifers lying between 2000 and 3000 meters depth from naturally permeable rocks of the Perth sedimentary basin. The geothermal water will be run through absorption chilling devices, which only require heat (as opposed to mechanical work) to power a chilled water stream adequate to meet the cooling requirements. Once the heat has been removed from the geothermal water, licensing issues require the water to be re-injected back into the aquifer system. These systems are intended to demonstrate the feasibility of powering large-scale air

  6. Geothermal project will predetermine future of the Kosice heating plant

    International Nuclear Information System (INIS)

    Hirman, K.

    2003-01-01

    Geoterm, a.s. manager O. Halas describes economic and technical parameters of geothermal energy source by village Durkov near Kosice. It is planned to exploitate geothermal energy source for Kosicka heating plant (TEKO). Three basic variants of technical connecting to geothermal source are developed. Temperature at TEKO entrance should reach 125 degrees, annual heating energy supply will reach 2100 TJ and source output will reach 100 MWt, while admissible deviation at all indicators reaches 10%. The first geothermal energy should by supplied to TEKO in 2007. The investments overlapping 3 billions Slovak crowns are necessary to realize whole project. According to O. Halas a credit from World Bank guaranteed by state is crucial

  7. Project Title: Geothermal Play Fairway Analysis of Potential Geothermal Resources in NE California, NW Nevada, and Southern Oregon: A Transition between Extension$-$Hosted and Volcanically$-$Hosted Geothermal Fields

    Energy Technology Data Exchange (ETDEWEB)

    McClain, James S. [Univ. of California, Davis, CA (United States). Dept. of; Dobson, Patrick [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Glassley, William [Univ. of California, Davis, CA (United States). Dept. of Earth and Planetary Sciences; Schiffman, Peter [Univ. of California, Davis, CA (United States). Dept. of Earth and Planetary Sciences; Zierenberg, Robert [Univ. of California, Davis, CA (United States). Dept. of Earth and Planetary Sciences; Zhang, Yingqi [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Conrad, Mark [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Siler, Drew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Gasperikova, Erika [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Spycher, Nicolas F. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2016-09-30

    Final report for the UCD-LBNL effort to apply Geothermal Play Fairway Analysis to a transition zone between a volcanically-hosted and extensionally-hosted geothermal. The project focusses on the geothermal resources in northeastern California.

  8. Geothermal Reservoir Technology Research Program: Abstracts of selected research projects

    Energy Technology Data Exchange (ETDEWEB)

    Reed, M.J. (ed.)

    1993-03-01

    Research projects are described in the following areas: geothermal exploration, mapping reservoir properties and reservoir monitoring, and well testing, simulation, and predicting reservoir performance. The objectives, technical approach, and project status of each project are presented. The background, research results, and future plans for each project are discussed. The names, addresses, and telephone and telefax numbers are given for the DOE program manager and the principal investigators. (MHR)

  9. Nevada Renewable Energy Training Project: Geothermal Power Plant Operators

    Energy Technology Data Exchange (ETDEWEB)

    Jim, Nichols [Truckee Meadows Community College, Reno, NV (United States)

    2014-04-29

    The purpose of this project was to develop and institute a training program for certified geothermal power plant operators (GPO). An advisory board consisting of subject matter experts from the geothermal energy industry and academia identified the critical skill sets required for this profession. A 34-credit Certificate of Achievement (COA), Geothermal Power Plant Operator, was developed using eight existing courses and developing five new courses. Approval from the Nevada System of Higher Education Board of Regents was obtained. A 2,400 sq. ft. geothermal/fluid mechanics laboratory and a 3,000 sq. ft. outdoor demonstration laboratory were constructed for hands-on training. Students also participated in field trips to geothermal power plants in the region. The majority of students were able to complete the program in 2-3 semesters, depending on their level of math proficiency. Additionally the COA allowed students to continue to an Associate of Applied Science (AAS), Energy Technologies with an emphasis in Geothermal Energy (26 additional credits), if they desired. The COA and AAS are stackable degrees, which provide students with an ongoing career pathway. Articulation agreements with other NSHE institutions provide students with additional opportunities to pursue a Bachelor of Applied Science in Management or Instrumentation. Job placement for COA graduates has been excellent.

  10. The snake geothermal drilling project. Innovative approaches to geothermal exploration

    Energy Technology Data Exchange (ETDEWEB)

    Shervais, John W. [Utah State Univ., Logan, UT (United States); Evans, James P. [Utah State Univ., Logan, UT (United States); Liberty, Lee M. [Boise State Univ., ID (United States); Schmitt, Douglas R. [University of Alberta, Canada; Blackwell, David D. [Southern Methodist Univ., Dallas, TX (United States)

    2014-02-21

    The goal of our project was to test innovative technologies using existing and new data, and to ground-truth these technologies using slim-hole core technology. The slim-hole core allowed us to understand subsurface stratigraphy and alteration in detail, and to correlate lithologies observed in core with surface based geophysical studies. Compiled data included geologic maps, volcanic vent distribution, structural maps, existing well logs and temperature gradient logs, groundwater temperatures, and geophysical surveys (resistivity, magnetics, gravity). New data included high-resolution gravity and magnetic surveys, high-resolution seismic surveys, three slimhole test wells, borehole wireline logs, lithology logs, water chemistry, alteration mineralogy, fracture distribution, and new thermal gradient measurements.

  11. Environmental Report Utah State Prison Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-03-01

    This environmental report assesses the potential impact of developing a geothermal resource for space heating at the Utah State Prison. Wells will be drilled on prison property for production and for injection to minimize reservoir depletion and provide for convenient disposal of cooled fluid. The most significant environmental concerns are the proper handling of drilling muds during well drilling and the disposal of produced water during well testing. These problems will be handled by following currently accepted practices to reduce the potential risks.

  12. The history and significance of the Hawaii geothermal project

    International Nuclear Information System (INIS)

    Thomas, D.M.

    1990-01-01

    This paper reports that the Hawaii Geothermal Project, since its initiation in 1972, has not only demonstrated that there is a viable geothermal resource present on the Kilauea East Rift Zone, it has also produced a wealth of information about the characteristics of the resource and the operational requirements that must be met to generate electrical power on a long term reliable basis. The HGP-A well demonstrated that a high-temperature hydrothermal system was present on the East Rift Zone; the HGP-A Wellhead Generator Facility showed that electrical power could be generated on a long-term basis from the geothermal reservoir with an availability factor of more than 90%; and research at the facility tested several types of systems for control of hydrogen sulfide and scale deposition. The results of the Hawaii Geothermal Project have helped resolve many uncertainties about the reservoir and will provide guidance to private and regulatory interests as a commercial geothermal development comes on line in Hawaii

  13. Geothermal environmental projects publication list with abstracts 1975-1978

    Energy Technology Data Exchange (ETDEWEB)

    Ricker, Y.E.; Anspaugh, L.R.

    1979-05-15

    This report contains 119 abstracts of publication resulting from or closely related to geothermal environmental projects conducted by the Environmental Sciences Division at Lawrence Livermore Laboratory. Publications are listed chronologically from 1975 through 1978. The main entries are numbered sequentially, and include the full citation, an abstract, and selected keywords. This section is followed by an author index, and a keyword index.

  14. Kenya geothermal private power project: A prefeasibility study

    Energy Technology Data Exchange (ETDEWEB)

    1992-10-01

    Twenty-eight geothermal areas in Kenya were evaluated and prioritized for development. The prioritization was based on the potential size, resource temperature, level of exploration risk, location, and exploration/development costs for each geothermal area. Suswa, Eburru and Arus are found to offer the best short-term prospects for successful private power development. It was found that cost per kill developed are significantly lower for the larger (50MW) than for smaller-sized (10 or 20 NW) projects. In addition to plant size, the cost per kill developed is seen to be a function of resource temperature, generation mode (binary or flash cycle) and transmission distance.

  15. The evolution of project financing in the geothermal industry

    International Nuclear Information System (INIS)

    Cardenas, G.S.; Miller, D.M.

    1990-01-01

    Sound underlying economics and beneficial contractual relationships are the fundamentals of any project financing. Given these essential elements, the successful transaction must properly allocate the costs, benefits and risks to the appropriate participants in the most efficient manner. In this paper the authors examine four instances in which project financing offered optimal solutions to this problem in a series of transactions for the successive development of the 70 MW Ormesa Geothermal Energy Complex in the Imperial Valley of California

  16. Parcperdue Geopressure -- Geothermal Project: Appendix E

    Energy Technology Data Exchange (ETDEWEB)

    Sweezy, L.R.

    1981-10-05

    The mechanical and transport properties and characteristics of rock samples obtained from DOW-DOE L.R. SWEEZY NO. 1 TEST WELL at the Parcperdue Geopressure/Geothermal Site have been investigated in the laboratory. Elastic moduli, compressibility, uniaxial compaction coefficient, strength, creep parameters, permeability, acoustic velocities (all at reservoir conditions) and changes in these quantities induced by simulated reservoir production have been obtained from tests on several sandstone and shale samples from different depths. Most important results are that the compaction coefficients are approximately an order of magnitude lower than those generally accepted for the reservoir sand in the Gulf Coast area and that the creep behavior is significant. Geologic characterization includes lithological description, SEM micrographs and mercury intrusion tests to obtain pore distributions. Petrographic analysis shows that approximately half of the total sand interval has excellent reservoir potential and that most of the effective porosity in the Cib Jeff Sand is formed by secondary porosity development.

  17. Southwest Alaska Regional Geothermal Energy Project

    Energy Technology Data Exchange (ETDEWEB)

    Holdmann, Gwen [Univ. of Alaska, Fairbanks, AK (United States)

    2015-04-30

    The village of Elim, Alaska is 96 miles west of Nome, on the Seward Peninsula. The Darby Mountains north of the village are rich with hydrothermal systems associated with the Darby granitic pluton(s). In addition to the hot springs that have been recorded and studied over the last 100 years, additional hot springs exist. They are known through a rich oral history of the region, though they are not labeled on geothermal maps. This research primarily focused on Kwiniuk Hot Springs, Clear Creek Hot Springs and Molly’s Hot Springs. The highest recorded surface temperatures of these resources exist at Clear Creek Hot Springs (67°C). Repeated water sampling of the resources shows that maximum temperatures at all of the systems are below boiling.

  18. National Conference of State Legislators Geothermal Project. Final report, February 1978-September 1982

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    The activities of the National Conference of State Legislatures Geothermal Project in stimulating and assessing state legislative action to encourage the efficient development of geothermal resources, including the use of ground water heat pumps, are reviewed by state. (MHR)

  19. Environmental assessment for geothermal loan guarantee: South Brawley geothermal exploration project

    Energy Technology Data Exchange (ETDEWEB)

    1979-11-01

    The foregoing analysis indicates that the proposed geothermal field experiment could result in several adverse environmental effects. Such effects would lie primarily in the areas of air quality, noise, aesthetics, land use, and water consumption. However, for the most part, mitigating measures have been, or easily could be, included in project plans to reduce these adverse effects to insignificant levels. Those aspects of the project which are not completely amenable to mitigation by any reasonable means include air quality, noise, aesthetics, land use and water use.

  20. Organizational Diagnosis in Project-Based Companies

    Directory of Open Access Journals (Sweden)

    Behrouz Zarei

    2014-05-01

    Full Text Available The purpose of this article is to develop a new method for corporate diagnosis (CD. To this end, a method is developed for the diagnosis process of project-based companies. The article presents a case study in a large company where data have been collected through focus groups. Project delay, high project cost, and low profitability are examples of project deficiency in project-based companies. Such issues have made managers pay special attention to find effective solutions to improve them. Prominent factors are inappropriate strategy, structure, system, human resource management, and PMBOK(Project Management Body of Knowledge processes. Thus, CD and analysis is an important task in improvement of corporate performance. The CD model that is developed in this article could be used for project-based companies. The proposed method can be used for CD in any project-based company. This article provides an emphatic application of CD as a prerequisite for restructuring in project-based companies.

  1. Guanacaste Geothermal Project. Technical prefeasibility report. Annex C. Electric resistivity

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    This report is the third of six annexes to the Summary Report on the First Phase of the Guanacaste Geothermal Project. The studies covered an area of 500 km/sup 2/ on the SW flanks of the Rincon de la Vieja and Miravalles volcanoes of the Guanacaste Volcanic Range in NW Costa Rica, and were aimed at locating zones of high geothermal gradient, and reconstruction of the stratigraphic column. The formations in the area under study can be grouped into six resistivity ranges, varying from less than 5 to more than 200 ohm-meters. Values from 200 to as high as 30,000 ohm-meters generally correspond to fractured and porous lavas, their fracturing and porosity, as well as their drainability, increasing with resistivity. The values above 100 ohm-meters were recorded in zones of recent lava flows, in spurs of the volcanoes Rincon de la Vieja and Santa Maria, and in the slopes of the Miravalles volcano, and correspond to shallow formations (maximum depths of 150 meters) which may constitute recharge zones for the underground aquifiers. The values in the 100 to 200 ohm-meter range were generally recorded directly under layers constituted by drained, porous lavas, or under shallow layers where no recent lavas are present. The third group comprises materials with resistivities in the 25 to 100 ohm-meter range, occurring at two different depth levels: a deep one (more than 1000 meters) and a shallow one (less than 400 meters). Resistivities less than 25 ohm-meters were recorded at depths of 250 meters and more, and may correspond to material typical of the Aguacate formation, which probably constitutes the reservoir rock of the geothermal fluids. In order to locate the zones of most geothermal interest, this range was classified into the three remaining of the six groups, viz 10 to 25, 5 to 10, and less than 5 ohm-meters, the last group appearing to be that of greatest geothermal potential.

  2. Geothermal direct-heat utilization assistance. Quarterly project progress report, April--June 1993

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1993-06-01

    Technical assistance was provided to 60 requests from 19 states. R&D progress is reported on: evaluation of lineshaft turbine pump problems, geothermal district heating marketing strategy, and greenhouse peaking analysis. Two presentations and one tour were conducted, and three technical papers were prepared. The Geothermal Progress Monitor reported: USGS Forum on Mineral Resources, Renewable Energy Tax Credits Not Working as Congress Intended, Geothermal Industry Tells House Panel, Newberry Pilot Project, and Low-Temperature Geothermal Resources in Nevada.

  3. Hawaiian Electric Company Demand Response Roadmap Project

    Energy Technology Data Exchange (ETDEWEB)

    Levy, Roger [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Kiliccote, Sila [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2013-01-12

    The objective of this project was to develop a “roadmap” to guide the Hawaiian Electric Company (HECO) demand response (DR) planning and implementation in support of the Hawaii Clean Energy Initiative (HCEI) 70% clean energy goal by 2030.

  4. 17th Symposium of NEDO projects. Geothermal subcommittee; Chinetsu bunkakai. Dai 17 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    Described herein are the reports presented to the geothermal subcommittee. The NEDO's Geothermal Research Department is developing the technologies for accurately predicting the reservoir changes in the future by the geothermal development promotion investigations for distributed conditions of geothermal resources and related environmental impacts, and also by clarifying the hydrogic characteristics of the fracture systems which form the reservoirs. The department is also implementing the projects for investigating/ researching possibilities of resources distribution conditions and utilization for eventual commercialization of the deep underground geothermal resources, and also investigating utilization of small- to medium-sized geothermal binary power generation systems for effective utilization of unutilized geothermal energy. The geothermal technology development group is developing the technologies for the binary cycle power generation plants which effectively utilize unutilized medium- to high-temperature geothermal water for power generation, and also the technologies for collecting conditions at the bottom of a geothermal well being excavated in real time to improve efficiency and precision of the excavation. The other technologies being developed include those for excavation and production essential for development of power generation systems using high-temperature rocks and deep underground geothermal resources, the former being expected to contribute to expanded utilization of geothermal resources and the latter to increased geothermal power generation capacity. (NEDO)

  5. 17th Symposium of NEDO projects. Geothermal subcommittee; Chinetsu bunkakai. Dai 17 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-09-01

    Described herein are the reports presented to the geothermal subcommittee. The NEDO's Geothermal Research Department is developing the technologies for accurately predicting the reservoir changes in the future by the geothermal development promotion investigations for distributed conditions of geothermal resources and related environmental impacts, and also by clarifying the hydrogic characteristics of the fracture systems which form the reservoirs. The department is also implementing the projects for investigating/ researching possibilities of resources distribution conditions and utilization for eventual commercialization of the deep underground geothermal resources, and also investigating utilization of small- to medium-sized geothermal binary power generation systems for effective utilization of unutilized geothermal energy. The geothermal technology development group is developing the technologies for the binary cycle power generation plants which effectively utilize unutilized medium- to high-temperature geothermal water for power generation, and also the technologies for collecting conditions at the bottom of a geothermal well being excavated in real time to improve efficiency and precision of the excavation. The other technologies being developed include those for excavation and production essential for development of power generation systems using high-temperature rocks and deep underground geothermal resources, the former being expected to contribute to expanded utilization of geothermal resources and the latter to increased geothermal power generation capacity. (NEDO)

  6. Probability-of-success studies for geothermal projects: from subsurface data to geological risk analysis

    Science.gov (United States)

    Schumacher, Sandra; Pierau, Roberto; Wirth, Wolfgang

    2017-04-01

    In recent years, the development of geothermal plants in Germany has increased significantly due to a favorable political setting and resulting financial incentives. However, most projects are developed by local communities or private investors, which cannot afford a project to fail. To cover the risk of total loss if the geothermal well should not provide the energy output necessary for an economically viable project, investors try to procure insurances for this worst case scenario. In order to issue such insurances, the insurance companies insist on so called probability-of-success studies (POS studies), in which the geological risk for not achieving the necessary temperatures and/or flow rates for an economically successful project is quantified. Quantifying the probability of reaching a minimum temperature, which has to be defined by the project investors, is relatively straight forward as subsurface temperatures in Germany are comparatively well known due tens of thousands of hydrocarbon wells. Moreover, for the German Molasse Basin a method to characterize the hydraulic potential of a site based on pump test analysis has been developed and refined in recent years. However, to quantify the probability of reaching a given flow rate with a given drawdown is much more challenging in areas where pump test data are generally not available (e.g. the North German Basin). Therefore, a new method based on log and core derived porosity and permeability data was developed to quantify the geological risk of reaching a determined flow rate in such areas. We present both methods for POS studies and show how subsurface data such as pump tests or log and core measurements can be used to predict the chances of a potential geothermal project from a geological point of view.

  7. Hotspot: the Snake River Geothermal Drilling Project--initial report

    Science.gov (United States)

    Shervais, J.W.; Nielson, D.; Lachmar, T.; Christiansen, E.H.; Morgan, L.; Shanks, Wayne C.; Delahunty, C.; Schmitt, D.R.; Liberty, L.M.; Blackwell, D.D.; Glen, J.M.; Kessler, J.A.; Potter, K.E.; Jean, M.M.; Sant, C.J.; Freeman, T.

    2012-01-01

    The Snake River volcanic province (SRP) overlies a thermal anomaly that extends deep into the mantle; it represents one of the highest heat flow provinces in North America. The primary goal of this project is to evaluate geothermal potential in three distinct settings: (1) Kimama site: inferred high sub-aquifer geothermal gradient associated with the intrusion of mafic magmas, (2) Kimberly site: a valley-margin setting where surface heat flow may be driven by the up-flow of hot fluids along buried caldera ringfault complexes, and (3) Mountain Home site: a more traditional fault-bounded basin with thick sedimentary cover. The Kimama hole, on the axial volcanic zone, penetrated 1912 m of basalt with minor intercalated sediment; no rhyolite basement was encountered. Temperatures are isothermal through the aquifer (to 960 m), then rise steeply on a super-conductive gradient to an estimated bottom hole temperature of ~98°C. The Kimberly hole is on the inferred margin of a buried rhyolite eruptive center, penetrated rhyolite with intercalated basalt and sediment to a TD of 1958 m. Temperatures are isothermal at 55-60°C below 400 m, suggesting an immense passive geothermal resource. The Mountain Home hole is located above the margin of a buried gravity high in the western SRP. It penetrates a thick section of basalt and lacustrine sediment overlying altered basalt flows, hyaloclastites, and volcanic sediments, with a TD of 1821 m. Artesian flow of geothermal water from 1745 m depth documents a power-grade resource that is now being explored in more detail. In-depth studies continue at all three sites, complemented by high-resolution gravity, magnetic, and seismic surveys, and by downhole geophysical logging.

  8. Draft Executive Summary Hawaii Geothermal Project - EIS Scoping Meetings

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-03-01

    After introductions by the facilitator and the program director from DOE, process questions were entertained. It was also sometimes necessary to make clarifications as to process throughout the meetings. Topics covered federal involvement in the HGP-EIS; NEPA compliance; public awareness, review, and access to information; Native Hawaiian concerns; the record of decision, responsibility with respect to international issues; the impacts of prior and on-going geothermal development activities; project definition; alternatives to the proposed action; necessary studies; Section 7 consultations; socioeconomic impacts; and risk analysis. Presentations followed, in ten meetings, 163 people presented issues and concerns, 1 additional person raised process questions only.

  9. Opportunities for Small Geothermal Projects: Rural Power for Latin America, the Caribbean, and the Philippines

    Energy Technology Data Exchange (ETDEWEB)

    Vimmerstedt, L.

    1998-11-30

    The objective of this report is to provide information on small geothermal project (less than 5 MW) opportunities in Latin America, the Caribbean, and the Philippines. This overview of issues facing small geothermal projects is intended especially for those who are not already familiar with small geothermal opportunities. This is a summary of issues and opportunities and serves as a starting point in determining next steps to develop this market.

  10. Opportunities for Small Geothermal Projects: Rural Power for Latin America, the Caribbean, and the Philippines

    International Nuclear Information System (INIS)

    Vimmerstedt, L.

    1998-01-01

    The objective of this report is to provide information on small geothermal project (less than 5 MW) opportunities in Latin America, the Caribbean, and the Philippines. This overview of issues facing small geothermal projects is intended especially for those who are not already familiar with small geothermal opportunities. This is a summary of issues and opportunities and serves as a starting point in determining next steps to develop this market

  11. The Idea of an Innovated Concept of the Košice Geothermal Project

    Directory of Open Access Journals (Sweden)

    Bujanská Alena

    2015-11-01

    Full Text Available Slovakia has very limited amounts of fossil resources. However, it has a relatively high potential of geothermal energy which use is far below its possibilities. The most abundant geothermal resource, not only in Slovakia but throughout the central Europe, is Košice basin. Since the publication of the first ideas about the ambitious goal to exploit the geothermal potential of this site, 20 years has passed and three geothermal wells has been made but without any progress. In the article the authors present the idea of a fundamental change in the approach to improve the energy and economic efficiency of the project.

  12. Geothermal R and D Project report for period July 1, 1976 to September 30, 1976

    Energy Technology Data Exchange (ETDEWEB)

    Kunze, J.F. (ed.)

    1976-12-01

    Progress in the third quarter of 1976 is reported for the geothermal energy projects conducted by or under the direction of the Idaho National Engineering Laboratory of the Energy Research and Development Administration. These projects include the Raft River geothermal development within reservoir and surface testing programs; the Boise Space Heating Project; the design and analysis of power conversion concepts for generating electricity from moderate temperature (approximately 150/sup 0/C or 300/sup 0/F) resources; advanced heat exchanger research and testing; and studies relating to a variety of direct uses of geothermal heat energy.

  13. Uses of geothermal energy in Jordan for heating greenhouses; project proposal

    International Nuclear Information System (INIS)

    Al-Dabbas, Moh'd A. F.; Masarwah, Rober; Elkarmi, Fawwaz

    1993-08-01

    A proposal for the exploration of geothermal energy in Jordan for heating greenhouses. The report gives some background information on geothermal anomalies in Jordan, and outlines some on-going uses of geothermal energy in various parts of Jordan. The proposal is modelled on the 2664 square meter Filclair Super 9 Multispan greenhouse from France. The overall cost of the project involves three variables, the cost of the borehole, the cost of the greenhouse, and the cost of engineering services. The total cost ranges between three to four million dollars depending on the quantity and quality of information to be collected from the borehole. The advantages of geothermal heating compared with oil heating are emphasized. The project will enable geothermal heating and horticultural production to be monitored throughout the year, will produce data enabling rational and reliable water resources management, and will produce environmentally clean and efficient energy. (A.M.H.). 1 tab. 1 map

  14. Guanacaste Geothermal Project. Technical prefeasibility report. Annex E. Geohydrology

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    This report is the fifth of six annexes to the Summary Report on the First Phase of the Guanacaste Geothermal Project. The studies covered an area of 500 km/sup 2/ on the SW flanks of the Rincon de la Vieja and Miravalles volcanoes of the Guanacaste Volcanic Range in NW Costa Rica, and were aimed at locating zones of high geothermal gradient, and reconstruction of the stratigraphic column. An estimate was made of the annual and low-water mark water reserves. Balances were also made for each basin taking into consideration precipitation, evapo-transpiration, and runoff. Determinations were also made of effluent and influent stream, recharge, and deep water circulation zones, and water tables. An underground flow pattern was observed, extending from the volcanic massifs where recharge takes place, to the plains near the Panamerican Highway. Using silica, specific conductivity, and chlorides as natural tracers, it was concluded that the underground and surface drainage patterns generally coincide. In the area around the Miravalles volcano, a zone was found near the township of Guayabal where seepage of deep waters appears to take place, showing high silica and chloride contents (more than 150 and 50 ppM respectively), and high conductivity (more than 500 mhos-cm). Springs with low mineral content, which could be associated with shallow circulation waters, are also present in this zone. This could be indicative of the existence of two horizons, a cold one above and a hot one below, separated by an impermeable layer. Another instance of seepage of deep waters is observed in the zone around the township of Salitral de Bagaces and the Aguas Calientes River. In the northeastern part of the area under study, it was observed that the underground drainage pattern conforms to the surface drainage of the Salitral and Tizate rivers.

  15. BACA Project: geothermal demonstration power plant. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1982-12-01

    The various activities that have been conducted by Union in the Redondo Creek area while attempting to develop the resource for a 50 MW power plant are described. The results of the geologic work, drilling activities and reservoir studies are summarized. In addition, sections discussing the historical costs for Union's involvement with the project, production engineering (for anticipated surface equipment), and environmental work are included. Nineteen geothermal wells have been drilled in the Redondo Creek area of the Valles Caldera: a prominent geologic feature of the Jemez mountains consisting of Pliocene and Pleistocene age volcanics. The Redondo Creek area is within a complex longitudinal graben on the northwest flank of the resurgent structural dome of Redondo Peak and Redondo Border. The major graben faults, with associated fracturing, are geologically plausible candidates for permeable and productive zones in the reservoir. The distribution of such permeable zones is too erratic and the locations too imprecisely known to offer an attractive drilling target. Log analysis indicates there is a preferred mean fracture strike of N31W in the upper portion of Redondo Creek wells. This is approximately perpendicular to the major structure in the area, the northeast-striking Redondo Creek graben. The geothermal fluid found in the Redondo Creek reservoir is relatively benign with low brine concentrations and moderate H/sub 2/S concentrations. Geothermometer calculations indicate that the reservoir temperature generally lies between 500/sup 0/F and 600/sup 0/F, with near wellbore flashing occurring during the majority of the wells' production.

  16. Environmental assessmental, geothermal energy, Heber geothermal binary-cycle demonstration project: Imperial County, California

    Energy Technology Data Exchange (ETDEWEB)

    1980-10-01

    The proposed design, construction, and operation of a commercial-scale (45 MWe net) binary-cycle geothermal demonstration power plant are described using the liquid-dominated geothermal resource at Heber, Imperial County, California. The following are included in the environmental assessment: a description of the affected environment, potential environmental consequences of the proposed action, mitigation measures and monitoring plans, possible future developmental activities at the Heber anomaly, and regulations and permit requirements. (MHR)

  17. Optimizing Seismic Monitoring Networks for EGS and Conventional Geothermal Projects

    Science.gov (United States)

    Kraft, Toni; Herrmann, Marcus; Bethmann, Falko; Stefan, Wiemer

    2013-04-01

    In the past several years, geological energy technologies receive growing attention and have been initiated in or close to urban areas. Some of these technologies involve injecting fluids into the subsurface (e.g., oil and gas development, waste disposal, and geothermal energy development) and have been found or suspected to cause small to moderate sized earthquakes. These earthquakes, which may have gone unnoticed in the past when they occurred in remote sparsely populated areas, are now posing a considerable risk for the public acceptance of these technologies in urban areas. The permanent termination of the EGS project in Basel, Switzerland after a number of induced ML~3 (minor) earthquakes in 2006 is one prominent example. It is therefore essential for the future development and success of these geological energy technologies to develop strategies for managing induced seismicity and keeping the size of induced earthquakes at a level that is acceptable to all stakeholders. Most guidelines and recommendations on induced seismicity published since the 1970ies conclude that an indispensable component of such a strategy is the establishment of seismic monitoring in an early stage of a project. This is because an appropriate seismic monitoring is the only way to detect and locate induced microearthquakes with sufficient certainty to develop an understanding of the seismic and geomechanical response of the reservoir to the geotechnical operation. In addition, seismic monitoring lays the foundation for the establishment of advanced traffic light systems and is therefore an important confidence building measure towards the local population and authorities. We have developed an optimization algorithm for seismic monitoring networks in urban areas that allows to design and evaluate seismic network geometries for arbitrary geotechnical operation layouts. The algorithm is based on the D-optimal experimental design that aims to minimize the error ellipsoid of the linearized

  18. Innovative approach for risk assessment in green field geothermal project

    NARCIS (Netherlands)

    Batini, F.; Wees, J.-D. van

    2010-01-01

    At present, the worldwide geothermal energy production provides less than 1% of the world's energy needs but the geothermal resources confined in the first 6 km of the earth's crust are estimated to be in the fairly above 200 GW of which 50-80 GW are located in Europe. Exploring and developing at

  19. Geothermal direct-heat utilization assistance. Quarterly project progress report, July 1996--September 1996. Federal Assistance Program

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.

    1996-11-01

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the fourth quarter of FY-96. It describes 152 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  20. Geothermal direct-heat utilization assistance. Quarterly project progress report, October--December 1997

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-01-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-98 (October--December 1997). It describes 216 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include requests for general information including maps and material for high school debates, and material on geothermal heat pumps, resource and well data, space heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, electric power and snow melting. Research activities include work on model construction specifications of lineshaft submersible pumps and plate heat exchangers, a comprehensive aquaculture developer package and revisions to the Geothermal Direct Use Engineering and Design Guidebook. Outreach activities include the publication of the Quarterly Bulletin (Vol. 18, No. 4) which was devoted entirely to geothermal activities in South Dakota, dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisition and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  1. Project Management Software for Distributed Industrial Companies

    Science.gov (United States)

    Dobrojević, M.; Medjo, B.; Rakin, M.; Sedmak, A.

    This paper gives an overview of the development of a new software solution for project management, intended mainly to use in industrial environment. The main concern of the proposed solution is application in everyday engineering practice in various, mainly distributed industrial companies. Having this in mind, special care has been devoted to development of appropriate tools for tracking, storing and analysis of the information about the project, and in-time delivering to the right team members or other responsible persons. The proposed solution is Internet-based and uses LAMP/WAMP (Linux or Windows - Apache - MySQL - PHP) platform, because of its stability, versatility, open source technology and simple maintenance. Modular structure of the software makes it easy for customization according to client specific needs, with a very short implementation period. Its main advantages are simple usage, quick implementation, easy system maintenance, short training and only basic computer skills needed for operators.

  2. Deep geothermal energy probe Heubach. Project plan and facility planning by using a practical example; Tiefen-Erdwaermesonde Heubach. Projektablauf und Anlagenplanung anhand eines Praxisbeispiels

    Energy Technology Data Exchange (ETDEWEB)

    Kuntz, David; Kuebert, Markus; Walker-Hertkorn, Simone [tewag GmbH, Starzach-Felldorf (Germany); Lemes, Zijad [HEAG Suedhessische Energie AG (HSE), Darmstadt (Germany). Q100 Regenerative Energien; Fritsche, Johann-Gerhard; Koett, Anne [Hessisches Landesamt fuer Umwelt und Geologie (HLUG), Wiesbaden (Germany)

    2012-10-16

    For the decentralized supply of an industrial company in Heubach nearby Gross-Umbach (Federal Republic of Germany) with geothermal energy for heating and cooling, the first geothermal deep drilling was performed in the German federal state of Hesse. The concept of a sustainable energy supply is based on the utilization of heat and cold from near-surface geothermal energy as well as on the heat production from an 800 metre coaxial deep geothermal probe (K-TEWS). HEAG Suedhessische Energie AG (Darmstadt, Bundesrepublik Deutschland) is the project manager. The company H. Anger's Soehne (Hessisch Lichtenau, Federal Republic of Germany) as a project partner is responsible for the execution of the drilling. Due to the innovative character and the outstanding importance for the future utilization of the geothermal energy for the energy supply, this project was promoted by the Hessian Ministry for the Environment, Energy, Agriculture and Consumer Protection (Wiesbaden, Federal Republic of Germany). The Hessian Agency for the Environment and Geology (Wiesbaden, Federal Republic of Germany) as well as the University Kassel (Kassel, Federal Republic of Germany) serve as scientific counterparts. Tewag GmbH (Regensburg, Federal Republic of Germany) is the technical planner of the geotechnical component of the execution of construction work, and is in charge of the thermal simulation and elaboration of the optimal extension concept. By means of this research and demonstration project, experiences on the heat supply using TEWS systems as well as on the project plan have to be acquired. Furthermore, experiences on the optimization in the planning and implementation are to be acquired in order to evaluate the transferability and economic efficiency at future locations practically. After presentation of the project, the authors of the contribution under consideration describe the planning phases of the project, some aspects of the public relations, the planning approaches, the

  3. Dynamic Capabilities and Project Management in Small Software Companies

    DEFF Research Database (Denmark)

    Nørbjerg, Jacob; Nielsen, Peter Axel; Persson, John Stouby

    2017-01-01

    A small software company depends on its capability to adapt to rapid technological and other changes in its environment—its dynamic capabilities. In this paper, we argue that to evolve and maintain its dynamic capabilities a small software company must pay attention to the interaction between...... dynamic capabilities at different levels of the company — particularly between the project management and the company levels. We present a case study of a small software company and show how successful dynamic capabilities at the company level can affect project management in small software companies...

  4. Utilization of geothermal energy for methane production for J. A. Albertson Land and Cattle Company. Final report

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    The feasibility of an integrated system to utilize a geothermal resource for a bioconversion plant. This integrated facility would use the manure from approximately 30,000 head of feedlot cattle as a feedstock for an anaerobic digestion plant. The findings on engineering design, geological assessment, environmental, economic, and institutional requirements of the proposed project are summarized. (MHR)

  5. Geothermal direct-heat utilization assistance: Federal assistance program. Quarterly project progress report, October--December 1995

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-02-01

    The report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-96. It describes 90 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment and resources. Research activities are summarized on low-temperature resource assessment, geothermal district heating system cost evaluation and silica waste utilization project. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, development of a webpage, and progress monitor reports on geothermal resources and utilization.

  6. Geothermal Direct Use Program Opportunity Notice Projects Lessons Learned Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Lunis, B.C.

    1986-01-01

    The use of geothermal energy for direct-use applications was aided through the development of a number of successful field experiment projects funded on a cost-shared basis by the US Department of Energy, Division of Geothermal Technology. This document provides a summary of the projects administered by the US Department of Energy's Idaho Operations Office and technically monitored through the Idaho National Engineering Laboratory (EG and G Idaho, Inc.). An overview of significant findings and conclusions is provided, as are project descriptions and activities, resource development, design, construction, and operational features. Legal and institutional considerations are also discussed.

  7. Community Geothermal Technology Program: Silica bronze project. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bianchini, H.

    1989-10-01

    Objective was to incorporate waste silica from the HGP-A geothermal well in Pohoiki with other refractory materials for investment casting of bronze sculpture. The best composition for casting is about 50% silica, 25% red cinders, and 25% brick dust; remaining ingredient is a binder, such as plaster and water.

  8. Geothermal source heat pumps under energy services companies finance scheme to increase energy efficiency and production in stockbreeding facilities

    International Nuclear Information System (INIS)

    Borge-Diez, David; Colmenar-Santos, Antonio; Pérez-Molina, Clara; López-Rey, África

    2015-01-01

    In Europe energy services are underutilized in terms of their potential to improve energy efficiency and reduce external energy dependence. Agricultural and stockbreeding sectors have high potential to improve their energy efficiency. This paper presents an energy model for geothermal source heat pumps in stockbreeding facilities and an analysis of an energy services business case. The proposed solution combines both energy cost reduction and productivity increases and improves energy services company financing scheme. CO 2 emissions drop by 89%, reducing carbon footprint and improving added value for the product. For the two different evaluated scenarios, one including winter heating and one including heating and cooling, high IRR (internal return rate) values are obtained. A sensitivity analysis reveals that the IRR ranges from 10.25% to 22.02%, making the investment attractive. To make the research highly extensible, a sensitivity analysis for different locations and climatic conditions is presented, showing a direct relationship between financial parameters and climatic conditions. A Monte Carlo simulation is performed showing that initial fuel cost and initial investment are the most decisive in the financial results. This work proves that energy services based on geothermal energy can be profitable in these sectors and can increase sustainability, reduce CO 2 emissions and improve carbon footprint. - Highlights: • Geothermal heat pumps are studied to promote industrial energy services. • Geothermal energy in farming facilities improves global competitiveness. • Research shows profitability of low enthalpy geothermal energy services. • Climatic conditions sensitivity analysis reveals IRR ranges from 10.25% to 22.02%. • Added market value for the product as carbon footprint reduction, are achieved

  9. Geothermal energy: an important but disregarded form of renewable energy; geological situation, projects and economy in Austria

    International Nuclear Information System (INIS)

    Walker-Hertkorn, S.

    2000-05-01

    This study deals with the topic geothermal energy. Although geothermal energy is an important energy sector within the area of the renewable energies, the European policy downgraded this important, promising energy sector in 1999. Normally, geothermal energy cannot be regarded as a renewable energy source because the heat content of the Earth, the gravitational heat, the source heat, frictional heat and the decay of radioactive isotopes in the further process of geologic history will eventually be exhausted. However, we are referring here to many millions of years. At the present time, geothermal energy can thus be regarded as an inexhaustible renewable energy source. This work is focused on the geothermal situation in Austria. For many people, the term 'geothermal energy' is associated with countries such as Iceland, Italy (Larderello) and New Zealand. However, in Austria there are also innovative projects in the geothermal energy sector that only very few people know about. Some of these trend-setting projects are presented here. Regarding the total situation in Austria, the geothermal potential is described specifically for the Calcareous Alpine nappe and the Vienna Basin. Furthermore, the first results concerning successful injection in Upper Austria and up to now unconsidered locations for geothermal energy plants are presented. This work attempts to present the attractiveness of geothermal energy projects to the public, thus emphasizing the importance of discussing it again on the political level. (author)

  10. US company's new nuclear project progresses

    International Nuclear Information System (INIS)

    Archie, Jeffrey B.

    2011-01-01

    Operated by South Carolina Electric and Gas Company in the southeastern United States, V.C. Summer Nuclear Station has maintained a reputation of excellence for more than 25 years. The key to its success: placing safety as its first priority, keeping a keen focus on operations, establishing a culture of continuous learning, and embracing collaboration with industry peers. This philosophy guides its new nuclear project, which SCE and G has undertaken to meet the need for baseload generation in its service area in a manner that is clean, safe, reliable, and efficient. In the process, SCE and G is generating jobs and boosting the economy. Site preparation has been under way since 2009. SCE and G anticipates receiving its combined construction and operating license from the Nuclear Regulatory Commission, the independent, federal agency that oversees commercial nuclear power plants in the U.S., in late 2011 or early 2012, which will allow major construction to commence. The 2 new reactors are scheduled to begin commercial operation in 2016 and 2019, respectively, placing V.C. Summer at the forefront of a U.S. nuclear renaissance and carrying its legacy of excellence into the future. (orig.)

  11. Hybrid Cooling for Geothermal Power Plants: Final ARRA Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Bharathan, D.

    2013-06-01

    Many binary-cycle geothermal plants use air as the heat rejection medium. Usually this is accomplished by using an air-cooled condenser (ACC) system to condense the vapor of the working fluid in the cycle. Many air-cooled plants suffer a loss of production capacity of up to 50% during times of high ambient temperatures. Use of limited amounts of water to supplement the performance of ACCs is investigated. Deluge cooling is found to be one of the least-cost options. Limiting the use of water in such an application to less than one thousand operating hours per year can boost plant output during critical high-demand periods while minimizing water use in binary-cycle geothermal power plants.

  12. Cheap-GSHPs, an European project aiming cost-reducing innovations for shallow geothermal installations. - Geological data reinterpretation

    Science.gov (United States)

    Bertermann, David; Müller, Johannes; Galgaro, Antonio; Cultrera, Matteo; Bernardi, Adriana; Di Sipio, Eloisa

    2016-04-01

    The success and widespread diffusion of new sustainable technologies are always strictly related to their affordability. Nowadays the energy price fluctuations and the economic crisis are jeopardizing the development and diffusion of renewable technologies and sources. With the aim of both reduce the overall costs of shallow geothermal systems and improve their installation safety, an European project has took place recently, under the Horizon 2020 EU Framework Programme for Research and Innovation. The acronym of this project is Cheap-GSHPs, meaning "cheap and efficient application of reliable ground source heat exchangers and pumps"; the CHEAP-GSHPs project involves 17 partners among 9 European countries such Belgium, France, Germany, Greece, Ireland, Italy, Romania, Spain, Switzerland. In order to achieve the planned targets, an holistic approach is adopted, where all involved elements that take part of shallow geothermal activities are here integrated. In order to reduce the drilling specific costs and for a solid planning basis the INSPIRE-conformal ESDAC data set PAR-MAT-DOM ("parent material dominant") was analysed and reinterpreted regarding the opportunities for cost reductions. Different ESDAC classification codes were analysed lithologically and sedimentologically in order to receive the most suitable drilling technique within different formations. Together with drilling companies this geological data set was translated into a geotechnical map which allows drilling companies the usage of the most efficient drilling within a certain type of underground. The scale of the created map is 1: 100,000 for all over Europe. This leads to cost reductions for the final consumers. Further there will be the definition of different heat conductivity classes based on the reinterpreted PAR-MAT-DOM data set which will provide underground information. These values will be reached by sampling data all over Europe and literature data. The samples will be measured by several

  13. Geothermal in transition

    International Nuclear Information System (INIS)

    Anderson, J.L.

    1991-01-01

    This article examines the current market for geothermal projects in the US and overseas. The topics of the article include future capacity needs, upgrading the Coso Geothermal project, the productivity of the Geysers area of Northern California, the future of geothermal, and new projects at Soda Lake, Carson Basin, Unalaska Island, and the Puna Geothermal Venture in Hilo, Hawaii

  14. Implementation Plan for the Hawaii Geothermal Project Environmental Impact Statement (DOE Review Draft:)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    The US Department of Energy (DOE) is preparing an Environmental Impact Statement (EIS) that identifies and evaluates the environmental impacts associated with the proposed Hawaii Geothermal Project (HGP), as defined by the State of Hawaii in its 1990 proposal to Congress (DBED 1990). The location of the proposed project is shown in Figure 1.1. The EIS is being prepared pursuant to the requirements of the National Environmental Policy Act of 1969 (NEPA), as implemented by the President's Council on Environmental Quality (CEQ) regulations (40 CFR Parts 1500-1508) and the DOE NEPA Implementing Procedures (10 CFR 1021), effective May 26, 1992. The State's proposal for the four-phase HGP consists of (1) exploration and testing of the geothermal resource beneath the slopes of the active Kilauea volcano on the Island of Hawaii (Big Island), (2) demonstration of deep-water power cable technology in the Alenuihaha Channel between the Big Island and Mau, (3) verification and characterization of the geothermal resource on the Big Island, and (4) construction and operation of commercial geothermal power production facilities on the Big Island, with overland and submarine transmission of electricity from the Big Island to Oahu and possibly other islands. DOE prepared appropriate NEPA documentation for separate federal actions related to Phase 1 and 2 research projects, which have been completed. This EIS will consider Phases 3 and 4, as well as reasonable alternatives to the HGP. Such alternatives include biomass coal, solar photovoltaic, wind energy, and construction and operation of commercial geothermal power production facilities on the Island of Hawaii (for exclusive use on the Big Island). In addition, the EIs will consider the reasonable alternatives among submarine cable technologies, geothermal extraction, production, and power generating technologies; pollution control technologies; overland and submarine power transmission routes; sites reasonably suited to

  15. Organisational Memories in Project-Based Companies: An Autopoietic View

    Science.gov (United States)

    Koskinen, Kaj U.

    2010-01-01

    Purpose: The purpose of this paper is to describe project-based companies' knowledge production and memory development with the help of autopoietic epistemology. Design/methodology/approach: The discussion first defines the concept of a project-based company. Then the discussion deals with the two epistemological assumptions, namely cognitivist…

  16. El Paso County Geothermal Project at Fort Bliss. Final Project Report

    Energy Technology Data Exchange (ETDEWEB)

    Lear, Jon [Ruby Mountain Inc., Salt Lake City, UT (United State); Bennett, Carlon [Ruby Mountain Inc., Salt Lake City, UT (United State); Lear, Dan [Ruby Mountain Inc., Salt Lake City, UT (United State); Jones, Phil L. [Ruby Mountain Inc., Salt Lake City, UT (United State); Burdge, Mark [Evergreen Clean Energy Management, Provo, UT (United States); Barker, Ben [Evergreen Clean Energy Management, Provo, UT (United States); Segall, Marylin [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Moore, Joseph [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Nash, Gregory [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Jones, Clay [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Simmons, Stuart [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.; Taylor, Nancy [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geoscience Inst.

    2016-02-01

    The El Paso County Geothermal Project at Fort Bliss was an effort to determine the scale and scope of geothermal resources previously identified on Fort Bliss’ McGregor Range in southern Otero County, New Mexico. The project was funded with a $5,000,000 grant to El Paso County from the U.S. Department of Energy (DOE) as part of the American Recovery and Reinvestment Act of 2009 and a $4,812,500 match provided by private sector partners. The project was administered through the DOE Golden Field Office to awardee El Paso County. The primary subcontractor to El Paso County and project Principal Investigator - Ruby Mountain Inc. (RMI) of Salt Lake City, Utah - assembled the project team consisting of Evergreen Clean Energy Management (ECEM) of Provo, Utah, and the Energy & Geoscience Institute at the University of Utah (EGI) in Salt Lake City, UT to complete the final phases of the project. The project formally began in May of 2010 and consisted of two preliminary phases of data collection and evaluation which culminated in the identification of a drilling site for a Resource Confirmation Well on McGregor Range. Well RMI 56-5 was drilled May and June 2013 to a depth of 3,030 ft. below ground level. A string of slotted 7 inch casing was set in 8.75 inch hole on bottom fill at 3,017 ft. to complete the well. The well was drilled using a technique called flooded reverse circulation, which is most common in mineral exploration. This technique produced an exceptionally large and complete cuttings record. An exciting development at the conclusion of drilling was the suspected discovery of a formation that has proven to be of exceptionally high permeability in three desalinization wells six miles to the south. Following drilling and preliminary testing and analysis, the project team has determined that the McGregor Range thermal anomaly is large and can probably support development in the tens of megawatts.

  17. Environmental Assessment of the Hawaii Geothermal Project Well Flow Test Program

    Energy Technology Data Exchange (ETDEWEB)

    None

    1976-11-01

    The Hawaii Geothermal Project, a coordinated research effort of the University of Hawaii, funded by the County and State of Hawaii, and ERDA, was initiated in 1973 in an effort to identify, generate, and use geothermal energy on the Big Island of Hawaii. A number of stages are involved in developing geothermal power resources: exploration, test drilling, production testing, field development, power plant and powerline construction, and full-scale production. Phase I of the Project, which began in the summer of 1973, involved conducting exploratory surveys, developing analytical models for interpretation of geophysical results, conducting studies on energy recovery from hot brine, and examining the legal and economic implications of developing geothermal resources in the state. Phase II of the Project, initiated in the summer of 1975, centers on drilling an exploratory research well on the Island of Hawaii, but also continues operational support for the geophysical, engineering, and socioeconomic activities delineated above. The project to date is between the test drilling and production testing phase. The purpose of this assessment is to describe the activities and potential impacts associated with extensive well flow testing to be completed during Phase II.

  18. Phase 2 Reese River Geothermal Project Slim Well 56-4 Drilling and Testing

    Energy Technology Data Exchange (ETDEWEB)

    Henkle, William R.; Ronne, Joel

    2008-06-15

    This report covers the drilling and testing of the slim well 56-4 at the Reese River Geothermal Project in Lander County, Nevada. This well was partially funded through a GRED III Cooperative Funding Agreement # DE-FC36-04GO14344, from USDOE.

  19. Heat Mining or Replenishable Geothermal Energy? A Project for Advanced-Level Physics Students

    Science.gov (United States)

    Dugdale, Pam

    2014-01-01

    There is growing interest in the use of low enthalpy geothermal (LEG) energy schemes, whereby heated water is extracted from sandstone aquifers for civic heating projects. While prevalent in countries with volcanic activity, a recently proposed scheme for Manchester offered the perfect opportunity to engage students in the viability of this form…

  20. Sectoral programming mission isotope techniques for geothermal development. Philippines. UNDP sectoral support

    International Nuclear Information System (INIS)

    Froehlich, K.; Sun, Y.

    1995-10-01

    This report discusses the accomplishments of IAEA Technical Cooperation project PHI/8/016 ''Isotope Techniques in Geothermal Hydrology''. It is intended to help Philippine National Oil Company's Energy Development Corporation (PNOC-EDC) in use of isotope techniques for geothermal development. This report discusses outcomes of the mission, conclusions and recommendations on applications of isotopes techniques in geothermal agro-industrial plants and geothermal hydrology

  1. The drama of Puna: For and against the Hawai'i geothermal project

    Science.gov (United States)

    Keyser, William Henry

    The geothermal project was conceived in the context of the international oil business and the economic growth of Hawai'i. From the point of view of the State, the geothermal project is necessary because imported petroleum provides Hawai'i with 911/2 percent of its total energy. That petroleum consists of 140,000 b/d of crude (1990) and it comes from Alaska, Indonesia and a few other suppliers. However, the Alaskan North Slope is beginning to run dry and the Southeast Asian suppliers of crude will be exporting less petroleum as time goes on. Increasingly, Hawai'i will become dependent on "unstable Middle Eastern" suppliers of crude. From this worry about the Middle East, the State seeks indigenous energy to reduce its dependence on petroleum and to support economic growth. Hence, the geothermal project was born after the 1973 oil embargo. The major source of geothermal energy is the Kilauea Volcano on the Big Island. Kilauea is characterized by the Kilauea caldera and a crack in the Island which extends easterly from the caldera to Cape Kumukahi in Puna and southwest to Pahala in Ka'u. The eastern part of the crack is approximately 55 kilometers long and 5 kilometers wide. The geothermal plants will sit on this crack. While the State has promoted the geothermal project with the argument of reducing "dependence" on imported petroleum, it hardly mentions its goal of economic growth. The opponents have resisted the project on the grounds of protecting Pele and Hawaiian gathering rights, protecting the rain forest, and stopping the pollution in the geothermal steam. What the opponents do not mention is their support for economic growth. The opposition to the project suggests a new environmental politics is forming in Hawai'i. Is this true? The dissertation will show that the participants in this drama are involved in a strange dance where each side avoids any recognition of their fundamental agreement on economic growth. Hence the creation of a new environmental

  2. NEDO geothermal energy subcommittee. 18th project report meeting; NEDO chinetsu bunkakai. Dai 18 kai jigyo hokokukai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-09-01

    Reporting on geothermal energy-related efforts, Taro Yamayasu, a NEDO (New Energy and Industrial Technology Development Organization) director, explains the promotion of researches on geothermal energy exploitation, researches on small and medium scale geothermal binary power system utilization, researches on geothermal exploration technology verification, and joint researches on small scale geothermal exploration on remote islands. Achievement reports are delivered concerning geothermal survey technology verification involving the development of reservoir fluctuation probing technology, deep-seated geothermal resources survey, and international joint projects. Concerning the research cooperation promotion project, a joint research program is reported involving a comprehensive geothermal resources analysis system for a remote island in the eastern part of Indonesia. In relation with the development of thermal water power plants, reports are delivered on the development of a 10MW class demonstration plant, development of technologies (study of elements) for a hot dry rock power system, development of a hole bottom data detection system for drilling in thermal water, and the development of deep-seated geothermal resources sampling technologies. (NEDO)

  3. Hawaii Geothermal Project annotated bibliography: Biological resources of the geothermal subzones, the transmission corridors and the Puna District, Island of Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Miller, S.E.; Burgett, J.M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1993-10-01

    Task 1 of the Hawaii Geothermal Project Interagency Agreement between the Fish and Wildlife Service and the Department of Energy-Oak Ridge National Laboratory (DOE) includes an annotated bibliography of published and unpublished documents that cover biological issues related to the lowland rain forest in Puna, adjacent areas, transmission corridors, and in the proposed Hawaii Geothermal Project (HGP). The 51 documents reviewed in this report cover the main body of biological information for these projects. The full table of contents and bibliography for each document is included along with two copies (as requested in the Interagency Agreement) of the biological sections of each document. The documents are reviewed in five main categories: (1) geothermal subzones (29 documents); (2) transmission cable routes (8 documents); (3) commercial satellite launching facility (Spaceport; 1 document); (4) manganese nodule processing facility (2 documents); (5) water resource development (1 document); and (6) ecosystem stability and introduced species (11 documents).

  4. Geothermal probabilistic cost study

    Energy Technology Data Exchange (ETDEWEB)

    Orren, L.H.; Ziman, G.M.; Jones, S.C.; Lee, T.K.; Noll, R.; Wilde, L.; Sadanand, V.

    1981-08-01

    A tool is presented to quantify the risks of geothermal projects, the Geothermal Probabilistic Cost Model (GPCM). The GPCM model is used to evaluate a geothermal reservoir for a binary-cycle electric plant at Heber, California. Three institutional aspects of the geothermal risk which can shift the risk among different agents are analyzed. The leasing of geothermal land, contracting between the producer and the user of the geothermal heat, and insurance against faulty performance are examined. (MHR)

  5. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which, in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  6. Executive summaries of reports leading to the construction of the Baca Geothermal Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    Sherwood, P.B.; Newman, K.L.; Westermeier, J.F.; Giroux, H.D.; Lowe, G.D.; Nienberg, M.W.

    1980-05-01

    Executive summaries have been written for 61 reports and compilations of data which in part, have led to the construction of the Baca 50 MW Geothermal Demonstration Project (GDP). The reports and data include environmental research, reservoir and feasibility studies, the project proposal to DOE and the Final Environmental Impact Statement. These executive summaries are intended to give the reader a general overview of each report prior to requesting the report from the GDP Data Manager.

  7. Advanced Low Temperature Geothermal Power Cycles (The ENTIV Organic Project) Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Mugerwa, Michael [Technip USA, Inc., Claremont, CA (United States)

    2015-11-18

    Feasibility study of advanced low temperature thermal power cycles for the Entiv Organic Project. Study evaluates amonia-water mixed working fluid energy conversion processes developed and licensed under Kalex in comparison with Kalina cycles. Both cycles are developed using low temperature thermal resource from the Lower Klamath Lake Geothermal Area. An economic feasibility evaluation was conducted for a pilot plant which was deemed unfeasible by the Project Sponsor (Entiv).

  8. Tampa Electric Company Polk Power Station IGCC project: Project status

    Energy Technology Data Exchange (ETDEWEB)

    McDaniel, J.E.; Carlson, M.R.; Hurd, R.; Pless, D.E.; Grant, M.D. [Tampa Electric Co., FL (United States)

    1997-12-31

    The Tampa Electric Company Polk Power Station is a nominal 250 MW (net) Integrated Gasification Combined Cycle (IGCC) power plant located to the southeast of Tampa, Florida in Polk County, Florida. This project is being partially funded under the Department of Energy`s Clean Coal Technology Program pursuant to a Round II award. The Polk Power Station uses oxygen-blown, entrained-flow IGCC technology licensed from Texaco Development Corporation to demonstrate significant reductions of SO{sub 2} and NO{sub x} emissions when compared to existing and future conventional coal-fired power plants. In addition, this project demonstrates the technical feasibility of commercial scale IGCC and Hot Gas Clean Up (HGCU) technology. The Polk Power Station achieved ``first fire`` of the gasification system on schedule in mid-July, 1996. Since that time, significant advances have occurred in the operation of the entire IGCC train. This paper addresses the operating experiences which occurred in the start-up and shakedown phase of the plant. Also, with the plant being declared in commercial operation as of September 30, 1996, the paper discusses the challenges encountered in the early phases of commercial operation. Finally, the future plans for improving the reliability and efficiency of the Unit in the first quarter of 1997 and beyond, as well as plans for future alternate fuel test burns, are detailed. The presentation features an up-to-the-minute update on actual performance parameters achieved by the Polk Power Station. These parameters include overall Unit capacity, heat rate, and availability. In addition, the current status of the start-up activities for the HGCU portion of the plant is discussed.

  9. Thermal properties variations in unconsolidated material for very shallow geothermal application (ITER project)

    Science.gov (United States)

    Sipio, Eloisa Di; Bertermann, David

    2018-04-01

    In engineering, agricultural and meteorological project design, sediment thermal properties are highly important parameters, and thermal conductivity plays a fundamental role when dimensioning ground heat exchangers, especially in very shallow geothermal systems. Herein, the first 2 m of depth from surface is of critical importance. However, the heat transfer determination in unconsolidated material is difficult to estimate, as it depends on several factors, including particle size, bulk density, water content, mineralogy composition and ground temperature. The performance of a very shallow geothermal system, as a horizontal collector or heat basket, is strongly correlated to the type of sediment at disposal and rapidly decreases in the case of dry-unsaturated conditions. The available experimental data are often scattered, incomplete and do not fully support thermo-active ground structure modeling. The ITER project, funded by the European Union, contributes to a better knowledge of the relationship between thermal conductivity and water content, required for understanding the very shallow geothermal systems behaviour in saturated and unsaturated conditions. So as to enhance the performance of horizontal geothermal heat exchangers, thermally enhanced backfilling material were tested in the laboratory, and an overview of physical-thermal properties variations under several moisture and load conditions for different mixtures of natural material was here presented.

  10. Federated product data management in multi company projects

    NARCIS (Netherlands)

    Pels, H.J.; Elmaraghy, H.A.; Elmaraghy, W.H.

    2005-01-01

    An approach for enabling concurrent engineering between companies by providing a proper collaboration platform, as developed in the VIDOP project is proposed. Apart from security, information status is an important element of trust. However, status-coding schemes differ much between companies and

  11. Geothermal direct-heat utilization assistance. Federal Assistance Program quarterly project progress report, April 1--June 30, 1998

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-07-01

    This report summarizes geothermal technical assistance, R and D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the third quarter of FY98 (April--June, 1998). It describes 231 contacts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with included requests for general information including material for high school and university students, and material on geothermal heat pumps, resource and well data, spacing heating and cooling, greenhouses, aquaculture, equipment, district heating, resorts and spas, industrial applications, snow melting and electric power. Research activities include work on model construction specifications for line shaft submersible pumps and plate heat exchangers, and a comprehensive aquaculture developers package. A brochure on Geothermal Energy in Klamath County was developed for state and local tourism use. Outreach activities include the publication of the Quarterly Bulletin (Vol. 19, No. 2) with articles on research at the Geo-Heat Center, sustainability of geothermal resources, injection well drilling in Boise, ID and a greenhouse project in the Azores. Other outreach activities include dissemination of information mainly through mailings of publications, tours of local geothermal uses, geothermal library acquisitions and use, participation in workshops, short courses and technical meetings by the staff, and progress monitor reports on geothermal activities.

  12. Geothermal projects funded under the NER 300 programme - current state of development and knowledge gained

    Science.gov (United States)

    Shortall, Ruth; Uihlein, Andreas

    2017-04-01

    Introduction The NER 300 programme, managed by the European Commission is one of the largest funding programmes for innovative low-carbon energy demonstration projects. NER 300 is so called because it is funded from the sale of 300 million emission allowances from the new entrants' reserve (NER) set up for the third phase of the EU emissions trading system (ETS). The programme aims to successfully demonstrate environmentally safe carbon capture and storage (CCS) and innovative renewable energy (RES) technologies on a commercial scale with a view to scaling up production of low-carbon technologies in the EU. Consequently, it supports a wide range of CCS and RES technologies (bioenergy, concentrated solar power, photovoltaics, geothermal, wind, ocean, hydropower, and smart grids). Funded projects and the role of geothermal projects for the programme In total, about EUR 2.1 billion have been awarded through the programme's 2 calls for proposals (the first awarded in December 2012, the second in July 2014). The programme has awarded around EUR 70 million funding to 3 geothermal projects in Hungary, Croatia and France. The Croatian geothermal project will enter into operation during 2017 the Hungarian in 2018, and the French in 2020. Knowledge Sharing Knowledge sharing requirements are built into the legal basis of the programme as a critical tool to lower risks in bridging the transition to large-scale production of innovative renewable energy and CCS deployment. Projects have to submit annually to the European Commission relevant knowledge gained during that year in the implementation of their project. The relevant knowledge is aggregated and disseminated by the European Commission to industry, research, government, NGO and other interest groups and associations in order to provide a better understanding of the practical challenges that arise in the important step of scaling up technologies and operating them at commercial scale. The knowledge sharing of the NER 300

  13. Progress of the LASL dry hot rock geothermal energy project

    Science.gov (United States)

    Smith, M. C.

    1974-01-01

    The possibilities and problems of extracting energy from geothermal reservoirs which do not spontaneously yield useful amounts of steam or hot water are discussed. The system for accomplishing this which is being developed first is a pressurized-water circulation loop intended for use in relatively impermeable hot rock. It will consist of two holes connected through the hot rock by a very large hydraulic fracture and connected at the surface through the primary heat exchanger of an energy utilization system. Preliminary experiments in a hole 2576 ft (0.7852 km) deep, extending about 470 ft (143 m) into the Precambrian basement rock underlying the Jemez Plateau of north-central New Mexico, revealed no unexpected difficulties in drilling or hydraulically fracturing such rock at a temperature of approximately 100 C, and demonstrated a permeability low enough so that it appeared probable that pressurized water could be contained by the basement rock. Similar experiments are in progress in a second hole, now 6701 ft (2.043 km) deep, about 1.5 miles (2.4 km) south of the first one.

  14. Guidebook to Geothermal Finance

    Energy Technology Data Exchange (ETDEWEB)

    Salmon, J. P.; Meurice, J.; Wobus, N.; Stern, F.; Duaime, M.

    2011-03-01

    This guidebook is intended to facilitate further investment in conventional geothermal projects in the United States. It includes a brief primer on geothermal technology and the most relevant policies related to geothermal project development. The trends in geothermal project finance are the focus of this tool, relying heavily on interviews with leaders in the field of geothermal project finance. Using the information provided, developers and investors may innovate in new ways, developing partnerships that match investors' risk tolerance with the capital requirements of geothermal projects in this dynamic and evolving marketplace.

  15. Final Progress Report for Project Entitled: Quantum Dot Tracers for Use in Engineered Geothermal Systems

    Energy Technology Data Exchange (ETDEWEB)

    Rose, Peter [Univ. of Utah, Salt Lake City, UT (United States); Bartl, Michael [Univ. of Utah, Salt Lake City, UT (United States); Reimus, Paul [Los Alamos National Lab. (LANL), Los Alamos, NM (United States); Williams, Mark [Pacific Northwest National Lab. (PNNL), Richland, WA (United States); Mella, Mike [Univ. of Utah, Salt Lake City, UT (United States)

    2015-09-12

    The objective of this project was to develop and demonstrate a new class of tracers that offer great promise for use in characterizing fracture networks in EGS reservoirs. From laboratory synthesis and testing through numerical modeling and field demonstrations, we have demonstrated the amazing versatility and applicability of quantum dot tracers. This report summarizes the results of four years of research into the design, synthesis, and characterization of semiconductor nanocrystals (quantum dots) for use as geothermal tracers.

  16. Mountain Home Geothermal Project: geothermal energy applications in an integrated livestock meat and feed production facility at Mountain Home, Idaho. [Contains glossary

    Energy Technology Data Exchange (ETDEWEB)

    Longyear, A.B.; Brink, W.R.; Fisher, L.A.; Matherson, R.H.; Neilson, J.A.; Sanyal, S.K.

    1979-02-01

    The Mountain Home Geothermal Project is an engineering and economic study of a vertically integrated livestock meat and feed production facility utilizing direct geothermal energy from the KGRA (Known Geothermal Resource Area) southeast of Mountain Home, Idaho. A system of feed production, swine raising, slaughter, potato processing and waste management was selected for study based upon market trends, regional practices, available technology, use of commercial hardware, resource characteristics, thermal cascade and mass flow considerations, and input from the Advisory Board. The complex covers 160 acres; utilizes 115 million Btu per hour (34 megawatts-thermal) of geothermal heat between 300/sup 0/F and 70/sup 0/F; has an installed capital of $35.5 million;produces 150,000 hogs per year, 28 million lbs. of processed potatoes per year, and on the order of 1000 continuous horsepower from methane. The total effluent is 200 gallons per minute (gpm) of irrigation water and 7300 tons per year of saleable high grade fertilizer. The entire facility utilizes 1000 gpm of 350/sup 0/F geothermal water. The economic analysis indicates that the complex should have a payout of owner-invested capital of just over three years. Total debt at 11% per year interest would be paid out in 12 (twelve) years.

  17. Proposal for the further development of the 'Ribeira Grande' agricultural geothermal project

    International Nuclear Information System (INIS)

    Popovski, Kiril; De Medeiros, Jorge Rosa; Rodrigues, Ana Catarina Tavares

    2000-01-01

    Geothermal project Ribeira Grande has been the first trial to introduce the possibilities of direct application of geothermal energy at Azores. As all the first experiences, it's development has been escorted with a list of difficulties and problems, resulting with non proper completion of some systems and installations. However, even not complete, the reached results justified both technically and economically the indigenous resource door for further activities and development. Presented proposal for the second phase of project development consists two very important advantages: 1) Enables development of new demonstration and productive projects, without engaging new import of fuels or other energents; 2) Enables development based on the already existing economy sectors at the islands and makes them more profitable and accommodated to the requests of the national and international market. However, influencing national and international preconditions for the realization of the proposed activities are not very convenient and are requesting a concentrate engagement of the Institute for Innovative Technologies of Azores INOVA during the period of next 5 years. The final success of this engagement shall open very wide possibilities for direct application of geothermal energy development in this isolated EC community, presently mainly orientated towards import both of energy and food. (Authors)

  18. Make-up wells drilling cost in financial model for a geothermal project

    Science.gov (United States)

    Oktaviani Purwaningsih, Fitri; Husnie, Ruly; Afuar, Waldy; Abdurrahman, Gugun

    2017-12-01

    After commissioning of a power plant, geothermal reservoir will encounter pressure decline, which will affect wells productivity. Therefore, further drilling is carried out to enhance steam production. Make-up wells are production wells drilled inside an already confirmed reservoir to maintain steam production in a certain level. Based on Sanyal (2004), geothermal power cost consists of three components, those are capital cost, O&M cost and make-up drilling cost. The make-up drilling cost component is a major part of power cost which will give big influence in a whole economical value of the project. The objective of this paper it to analyse the make-up wells drilling cost component in financial model of a geothermal power project. The research will calculate make-up wells requirements, drilling costs as a function of time and how they influence the financial model and affect the power cost. The best scenario in determining make-up wells strategy in relation with the project financial model would be the result of this research.

  19. How to boost shallow geothermal energy exploitation in the adriatic area: the LEGEND project experience

    International Nuclear Information System (INIS)

    Francesco, Tinti; Annamaria, Pangallo; Martina, Berneschi; Dario, Tosoni; Dušan, Rajver; Simona, Pestotnik; Dalibor, Jovanović; Tomislav, Rudinica; Slavisa, Jelisić; Branko, Zlokapa; Attilio, Raimondi

    2016-01-01

    The evaluation, monitoring and reduction of the heating and cooling consumptions are topics of increasing importance. One promising technology is the geothermal heat pump. Despite its undoubted advantages compared to fossil fuels in terms of RES production, CO_2 reduction and primary energy savings, there are still significant barriers for the creation of sustainable local markets. Many regions present similar conditions in terms of climate, geology, hydrogeology, infrastructure and political conditions. Because of the context-driven nature of shallow geothermal systems, similarities should be taken into account and strategies shared across borders to foster the introduction and exploitation of shallow geothermal energy. Focusing on the results of the LEGEND Project, this paper presents an attempt at creating an interregional strategy for the widespread introduction of geothermal heat pumps in the Adriatic area, which includes EU and non-EU countries. The multi-level approach adopted (a combination of desk studies on the transferability potential, pilot plants across the regions and programs to involve, educate and train stakeholders) allowed to set up the strategy. Therefore, different actions are proposed to stimulate the development of the market, whose interconnection across the Adriatic can accelerate the achievement of the main energy and climate targets for all the countries involved. - Highlights: •The Interregional Adriatic strategy for shallow geothermal energy is presented. •The strategy speeds up renewable energy introduction in border countries. •Geological, climate, market and political similarities must be taken into account. •The preparatory action is the creation of trained market and supply chain.

  20. American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance for Geothermal Resource Evaluation Projects

    Energy Technology Data Exchange (ETDEWEB)

    Robert P. Breckenridge; Thomas R. Wood; Joel Renner

    2010-09-01

    The purpose of this document is to report on the evaluation of geothermal resource potential on and around three different United States (U. S.) Air Force Bases (AFBs): Nellis AFB and Air Force Range (AFR) in the State of Nevada (see maps 1 and 5), Holloman AFB in the State of New Mexico (see map 2), and Mountain Home AFB in the State of Idaho (see map 3). All three sites are located in semi-arid parts of the western U. S. The U. S. Air Force, through its Air Combat Command (ACC) located at Langley AFB in the State of Virginia, asked the Federal Energy Management Program (FEMP) for technical assistance to conduct technical and feasibility evaluations for the potential to identify viable geothermal resources on or around three different AFBs. Idaho National Laboratory (INL) is supporting FEMP in providing technical assistance to a number of different Federal Agencies. For this report, the three different AFBs are considered one project because they all deal with potential geothermal resource evaluations. The three AFBs will be evaluated primarily for their opportunity to develop a geothermal resource of high enough quality grade (i.e., temperature, productivity, depth, etc.) to consider the possibility for generation of electricity through a power plant. Secondarily, if the resource for the three AFBs is found to be not sufficient enough for electricity generation, then they will be described in enough detail to allow the base energy managers to evaluate if the resource is suitable for direct heating or cooling. Site visits and meetings by INL personnel with the staff at each AFB were held in late FY-2009 and FY-2010. This report provides a technical evaluation of the opportunities and challenges for developing geothermal resources on and around the AFBs. An extensive amount of literature and geographic information was evaluated as a part of this assessment. Resource potential maps were developed for each of the AFBs.

  1. Effective use of environmental impact assessments (EIAs) for geothermal development projects

    International Nuclear Information System (INIS)

    Goff, S.J.

    2000-01-01

    Both the developed and developing nations of the world would like to move toward a position of sustainable development while paying attention to the restoration of natural resources, improving the environment, and improving the quality of life. The impacts of geothermal development projects are generally positive. It is important, however, that the environmental issues associated with development be addressed in a systematic fashion. Drafted early in the project planning stage, a well-prepared Environmental Impact Assessment (EIA) can significantly add to the quality of the overall project. An EIA customarily ends with the decision to proceed with the project. The environmental analysis process could be more effective if regular monitoring, detailed in the EIA, continues during project implementation. Geothermal development EIAs should be analytic rather than encyclopedic, emphasizing the impacts most closely associated with energy sector development. Air quality, water resources and quality, geologic factors, and socioeconomic issues will invariably be the most important factors. The purpose of an EIA should not be to generate paperwork, but to enable superb response. The EIA should be intended to help public officials make decisions that are based on an understanding of environmental consequences and take proper actions. The EIA process has been defined in different ways throughout the world. In fact, it appears that no two countries have defined it in exactly the same way. Going hand in hand with the different approaches to the process is the wide variety of formats available. It is recommended that the world geothermal community work towards the adoption of a standard. The Latin American Energy Organization (OLADE) and the Inter-American Development Bank (IDB)(OLADE, 1993) prepared a guide that presents a comprehensive discussion of the environmental impacts and suggested mitigation alternatives associated with geothermal development projects. The OLADE guide

  2. Desert Peak East Enhanced Geothermal Systems (EGS) Project

    Energy Technology Data Exchange (ETDEWEB)

    Zemach, Ezra [Ormat Technologies Inc., Reno, NV (United States); Drakos, Peter [Ormat Technologies Inc., Reno, NV (United States); Spielman, Paul [Ormat Technologies Inc., Reno, NV (United States); Akerley, John [Ormat Technologies Inc., Reno, NV (United States)

    2013-09-30

    This manuscript is a draft to replaced with a final version at a later date TBD. A summary of activities pertaining to the Desert Peak EGS project including the planning and resulting stimulation activities.

  3. Potential effects of the Hawaii Geothermal Project on ground-water resources on the island of Hawaii

    Science.gov (United States)

    Sorey, M.L.; Colvard, E.M.

    1994-01-01

    In 1990, the State of Hawaii proposed the Hawaii Geothermal Project for the development of as much as 500 MW of electric power from the geothermal system in the East Rift Zone of Kilauea Volcano. This report uses data from 31 wells and 8 springs to describe the properties of the ground-water system in and adjacent to the East Rift Zone. Potential effects of this project on ground-water resources are also discussed. Data show differences in ground-water chemistry and heads within the study area that appear to be related to mixing of waters of different origins and ground-water impoundment by volcanic dikes. East of Pahoa, the ground-water system within the rift is highly transmissive and receives abundant recharge from precipitation; therefore, the pumping of freshwater to support geothermal development in that part of the rift zone would have a minimal effect on ground-water levels. To the southwest of Pahoa, dike impoundment reduces the transmissivity of the ground-water system to such an extent that wells might not be capable of supplying sufficient fresh water to support geothermal operations. Contamination of ground-water resources by accidental release of geothermal fluids into shallow aquifers is possible because of corrosive conditions in the geothermal wells, potential well blowouts, and high ground-water velocities in parts of the region. Hydrologic monitoring of water level, temperature, and chemistry in observation wells should continue throughout development of geothermal resources for the Hawaii Geothermal Project for early detection of leakage and migration of geothermal fluids within the groundwater system.

  4. Managing IT Projects in Public Companies: A Case Study

    Directory of Open Access Journals (Sweden)

    Bouras, A.

    2014-07-01

    Full Text Available As part of its public sector modernization effort, a North African government has put a lot of effort and allocated significant budgets since 1997 to modernize one of its main public sector companies. Consequently, this company, that mainly offers postal services, initiated many IT-based projects to computerize all paper-based ongoing services offered through its branches and to present new products to customers. This company was aiming to improve service quality and to diversify the range of its services. However, some of these IT-based projects inevitably faced problems. Some projects were either not completed successfully, cancelled, over-budget or taking more time than scheduled. As a result, many employees and customers of this company were dissatisfied and complained about bad planning, slowness and significant disruptions in these projects, an event that affected adversely the quality of service. This study aims at determining the causes of these project disruptions, failures or delays. To achieve this aim, 30 experienced project developers and engineers working in that company’s IT department volunteered to respond to a detailed questionnaire specifically developed for this purpose. The questionnaire included questions about project vision clarity, time/cost management, project quality assurance, risk management and human resources management. Results show that the main reasons for disruptions, failure or delays in IT projects are lack of business plan and poor documentation during and after finishing projects, lack of clear quality assurance criteria, standards and reviews, and poor project risk management practices. Ramifications of such results in terms of improving IT project management practices in the public service sector are finally presented.

  5. Hot Dry Rock Geothermal Energy Development Project. Annual report, fiscal year 1977

    Energy Technology Data Exchange (ETDEWEB)

    1978-02-01

    The feasibility of extracting geothermal energy from hot dry rock in the earth's crust was investigated. The concept being investigated involves drilling a deep hole, creating an artificial geothermal reservoir at the bottom of the hole by hydraulic fracturing, and then intersecting the fracture with a second borehole. At the beginning of FY77, the downhole system was complete, but the impedance to the flow of fluid was too high to proceed confidently with the planned energy extraction demonstration. Therefore, in FY77 work focused on an intensive investigation of the characteristics of the downhole system and on the development of the necessary tools and techniques for understanding and improving it. Research results are presented under the following section headings: introduction and history; hot dry rock resource assessment and site selection; instrumentation and equipment development; drilling and fracturing; reservoir engineering; energy extraction system; environmental studies; project management and liaison; and, looking back and ahead. (JGB)

  6. Native Hawaiian Ethnographic Study for the Hawaii Geothermal Project Proposed for Puna and Southeast Maui

    Energy Technology Data Exchange (ETDEWEB)

    Matsuoka, J.K; Minerbi, L. [Cultural Advocacy Network for Developing Options (CANDO) (United States); Kanahele, P.; Kelly, M.; Barney-Campbell, N.; Saulsbury [Oak Ridge National Lab., TN (United States); Trettin, L.D. [Tennessee Univ., Knoxville, TN (United States)

    1996-05-01

    This report makes available and archives the background scientific data and related information collected for an ethnographic study of selected areas on the islands of Hawaii and Maui. The task was undertaken during preparation of an environmental impact statement for Phases 3 and 4 of the Hawaii Geothermal Project (HGP) as defined by the state of Hawaii in its April 1989 proposal to Congress. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. Information is included on the ethnohistory of Puna and southeast Maui; ethnographic fieldwork comparing Puna and southeast Maui; and Pele beliefs, customs, and practices.

  7. Potential effects of the Hawaii geothermal project on ground-water resources on the Island of Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Sorey, M.L.; Colvard, E.M.

    1994-07-01

    This report provides data and information on the quantity and quality of ground-water resources in and adjacent to proposed geothermal development areas on the Island of Hawaii Geothermal project for the development of as much as 500 MW of electric power from the geothermal system in the East Rift Zone of Kilauea Volcano. Data presented for about 31 wells and 8 springs describe the chemical, thermal, and hydraulic properties of the ground-water system in and adjacent to the East Rift Zone. On the basis of this information, potential effects of this geothermal development on drawdown of ground-water levels and contamination of ground-water resources are discussed. Significant differences in ground-water levels and in the salinity and temperature of ground water within the study area appear to be related to mixing of waters from different sources and varying degrees of ground-water impoundment by volcanic dikes. Near Pahoa and to the east, the ground-water system within the rift is highly transmissive and receives abundant recharge from precipitation; therefore, the relatively modest requirements for fresh water to support geothermal development in that part of the east rift zone would result in minimal effects on ground-water levels in and adjacent to the rift. To the southwest of Pahoa, dike impoundment reduces the transmissivity of the ground-water system to such an extent that wells might not be capable of supplying fresh water at rates sufficient to support geothermal operations. Water would have to be transported to such developments from supply systems located outside the rift or farther downrift. Contaminant migration resulting from well accidents could be rapid because of relatively high ground-water velocities in parts of the region. Hydrologic monitoring of observation wells needs to be continued throughout development of geothermal resources for the Hawaii Geothermal Project to enable the early detection of leakage and migration of geothermal fluids.

  8. Summary Report, Southwest Regional Geothermal Operations Research Program: First project year, June 1977-August 1978

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, Richard T.; Davidson, Ray

    1978-12-01

    The overall objectives of the first year project were as follows: (1) to develop realistic but aggressive scenarios with certainty factors for the development of each identified geothermal resource area in Arizona, Colorado, Nevada, New Mexico, and Utah; (2) to delineate the public actions, together with their schedules, required for the scenarios to materialize; and (3) to develop a computer-based data storage and retrieval system (i.e. a Regional Program Progress Monitor) of the level of a preliminary working model, which is capable of displaying program approach but is not loaded with all available data. In addition, each sponsor had supplementary objectives aligned to its own programmatic goals. DOE sought to develop expertise and programs within the appropriate state agencies upon which future DOE development and commercialization activities could be structured. FCRC sought to promote the utilization of geothermal energy throughout the five-state region for purposes of expanded economic development, increased employment, and higher citizen incomes. The goals of the five states varied from state to state, but generally included the following: development of alternative energy sources to replace dwindling supplies of oil and natural gas; economic and industrial development in rural areas; encouragement of industry and utility development of geothermal energy for electrical power generation; demonstration of the practical applications of energy research and development; and close interaction with business and industry for the commercialization of both electric and direct thermal applications.

  9. Geothermal energy in the western United States and Hawaii: Resources and projected electricity generation supplies. [Contains glossary and address list of geothermal project developers and owners

    Energy Technology Data Exchange (ETDEWEB)

    1991-09-01

    Geothermal energy comes from the internal heat of the Earth, and has been continuously exploited for the production of electricity in the United States since 1960. Currently, geothermal power is one of the ready-to-use baseload electricity generating technologies that is competing in the western United States with fossil fuel, nuclear and hydroelectric generation technologies to provide utilities and their customers with a reliable and economic source of electric power. Furthermore, the development of domestic geothermal resources, as an alternative to fossil fuel combustion technologies, has a number of associated environmental benefits. This report serves two functions. First, it provides a description of geothermal technology and a progress report on the commercial status of geothermal electric power generation. Second, it addresses the question of how much electricity might be competitively produced from the geothermal resource base. 19 figs., 15 tabs.

  10. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    2016-12-01

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful development today requires a good knowledge of geothermal system design and operation.

  11. Low-Temperature Projects of the Department of Energy's Geothermal Technologies Program: Evaluation and Lessons Learned

    Energy Technology Data Exchange (ETDEWEB)

    Williams, Tom; Snyder, Neil; Gosnold, Will

    2016-10-23

    This paper discusses opportunities and challenges related to the technical and economic feasibility of developing power generation from geothermal resources at temperatures of 150 degrees C and lower. Insights from projects funded by the U.S. Department of Energy (DOE), Geothermal Technologies Office inform these discussions and provide the basis for some lessons learned to help guide decisions by DOE and the industry in further developing this resource. The technical basis for low-temperature geothermal energy is well established and the systems can be economic today in certain situations. However, these applications are far from a 'plug and play' product; successful development today requires a good knowledge of geothermal system design and operation.

  12. Innovative exploration technologies in the Jemez Geothermal Project, New Mexico, USA; Innovative Explorationstechniken im Jemez Geothermal Projekt, New Mexico, USA

    Energy Technology Data Exchange (ETDEWEB)

    Albrecht, Michael [TBAPower Inc., Salt Lake City, UT (United States); Tenzer, Helmut; Sperber, Axel; Bussmann, Werner [uutGP GmbH, Geeste (Germany)

    2012-10-16

    First geothermal explorations were carried out in the year 1989 in the sovereign Indian Reservation situated nearly 70 km northwest of Albuquerque. (New Mexico, United States of America). In 1991, an exploration drilling at a depth of 80 meter supplied artesian 52 Celsius hot water with xx L/s. Different feasibility studies on the geothermal utilization and on different utilization concepts were established. The economic situation of the region has to be improved by means of a coupled geothermal utilization. The region was explored by means of magnetotellurics (up to depth of 8 kilometre) and reflection seismics (up to a depth of 2.2 kilometre). A graben structure between the Indian Spring fault in the west and the Vallecitos fault in the east are indicative of a geothermal convection zone. Subsequently, an innovative seismic data analysis by means of Elastic Wave Reverse-Time Migration and Wavefield-Separation Imaging Condition was performed. The previous model could be improved considerably. A preliminary drilling program up to a depth of 2,000 meter with Casing design and planning of the borepath occurred. Under socio-economic aspects, up to nine members of the tribe enjoyed an education or further training to engineers under the control of TBA Power Inc. (Salt Laky City, Utah, United State of America).

  13. Environmental Assessment and Finding of No Significant Impact: Kalina Geothermal Demonstration Project Steamboat Springs, Nevada

    Energy Technology Data Exchange (ETDEWEB)

    N/A

    1999-02-22

    The Department of Energy (DOE) has prepared an Environmental Assessment (EA) to provide the DOE and other public agency decision makers with the environmental documentation required to take informed discretionary action on the proposed Kalina Geothermal Demonstration project. The EA assesses the potential environmental impacts and cumulative impacts, possible ways to minimize effects associated with partial funding of the proposed project, and discusses alternatives to DOE actions. The DOE will use this EA as a basis for their decision to provide financial assistance to Exergy, Inc. (Exergy), the project applicant. Based on the analysis in the EA, DOE has determined that the proposed action is not a major Federal action significantly affecting the quality of the human or physical environment, within the meaning of the National Environmental Policy Act (NEPA) of 1969. Therefore, the preparation of an environmental impact statement is not required and DOE is issuing this Finding of No Significant Impact (FONSI).

  14. Geothermal energy

    International Nuclear Information System (INIS)

    Vuataz, F.-D.

    2005-01-01

    This article gives a general overview of the past and present development of geothermal energy worldwide and a more detailed one in Switzerland. Worldwide installed electrical power using geothermal energy sources amounts to 8900 MW el . Worldwide utilization of geothermal energy for thermal applications amounts to 28,000 MW th . The main application (56.5%) is ground-coupled heat pumps, others are thermal spas and swimming pools (17.7%), space heating (14.9%), heating of greenhouses (4.8%), fish farming (2.2%), industrial uses (1,8%), cooling and melting of snow (1.2%), drying of agricultural products (0.6 %). Switzerland has become an important user of geothermal energy only in the past 25 years. Earlier, only the exploitation of geothermal springs (deep aquifers) in Swiss thermal baths had a long tradition, since the time of the Romans. Today, the main use of geothermal energy is as a heat source for heat pumps utilizing vertical borehole heat exchangers of 50 to 350 meters length. 35,000 installations of this type with heating powers ranging from a few kW to 1000 kW already exist, representing the highest density of such installations worldwide. Other developments are geostructures and energy piles, the use of groundwater for heating and cooling, geothermal district heating, the utilization of draining water from tunnels and the project 'Deep Heat Mining' allowing the combined production of heat and electric power

  15. Geothermal. Section 2: Products and services

    International Nuclear Information System (INIS)

    Anon.

    1991-01-01

    This is a directory of companies providing products and services in the area of geothermal power. The subheadings of the directory include developers and owner operators, equipment manufacturers, measuring instruments and controls, consulting services, engineering and construction, operation and maintenance, project management, repair, and financial and legal services

  16. IT Project Management in Very Small Software Companies

    DEFF Research Database (Denmark)

    Shakir, Shahid Nadeem; Nørbjerg, Jacob

    2013-01-01

    In developing countries very small software companies (VSSCs) with only 1-10 employees play an important role both in the local economy and as providers of software and services to customers in other parts of the world. Understanding and improving their IT project management (ITPM) practices...... and challenges are, therefore, important in the local as well as the larger context of globalized software development. There is, however, very little research into small shop software practices in developing countries. The current paper explores actual ITPM practices in Pakistani VSSCs based on a qualitative...... study of seven Pakistani VSSCs. We find that some Pakistani ITPM practices are similar to what is reported from VSSCs in other parts of the world, while others seem to be related to the companies' position in the global software development chain. This paper is part of a larger research project aiming...

  17. MARKETING STRATEGIES AND TACTICS OF ADVERTISING PROJECTS FOR TOURISM COMPANIES

    OpenAIRE

    O. M. Tolmachev

    2016-01-01

    The subject / topic. The relevance of the article is that today tourism is a massive social and economic phenomenon of global scale, as is known, any vacation begins with advertising. Therefore, for the progressive development of tourism companies need to develop an eff ective strategy and tactics of advertising projects. Potential consumers have become more discerning and prudent, so a consultant position with the fl ood of information does not work. Works expert position, when the product i...

  18. Analysis of how changed federal regulations and economic incentives affect financing of geothermal projects

    Energy Technology Data Exchange (ETDEWEB)

    Meyers, D.; Wiseman, E.; Bennett, V.

    1980-11-04

    The effects of various financial incentives on potential developers of geothermal electric energy are studied and the impact of timing of plant construction costs on geothermal electricity costs is assessed. The effect of the geothermal loan guarantee program on decisions by investor-owned utilities to build geothermal electric power plants was examined. The usefulness of additional investment tax credits was studied as a method for encouraging utilities to invest in geothermal energy. The independent firms which specialize in geothermal resource development are described. The role of municipal and cooperative utilities in geothermal resource development was assessed in detail. Busbar capital costs were calculated for geothermal energy under a variety of ownerships with several assumptions about financial incentives. (MHR)

  19. Final Technical Resource Confirmation Testing at the Raft River Geothermal Project, Cassia County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    Glaspey, Douglas J.

    2008-01-30

    Incorporates the results of flow tests for geothermal production and injection wells in the Raft River geothermal field in southern Idaho. Interference testing was also accomplished across the wellfield.

  20. Guanacaste Geothermal Project. Technical prefeasibility report. Annex F. Heat flow. [Las Hornillas, Las Pailas, and Boriaguen

    Energy Technology Data Exchange (ETDEWEB)

    1976-12-01

    This report is the sixth of six annexes (designated A through F) to the Summary Report on the First Phase of the Guanacaste Geothermal Project. The studies covered an area of 500 km/sup 2/ on the SW flanks of the Rincon de la Vieja and Miravalles volcanoes of the Guanacaste Volcanic Range in NW Costa Rica, and were aimed at locating zones of high geothermal gradient, and reconstruction of the stratigraphic column. The three areas that have the highest geothermal resource potential were investigated for heat flow. They are the zones of Las Hornillas on the slopes of the Miravalles volcano, Las Pailas on the slopes of the Rincon de la Vieja volcano and, to a lesser extent, the zone of Borinquen. A total of 2500 meters were drilled in 35 thermal gradient wells. Of these, 27 wells were drilled in the Las Hornillas zone, 7 in Las Pailas, and only 1 in Borinquen. In the Las Hornillas zone of the Miravalles volcano, the temperature-vs.-depth profiles exhibit a higher slope in areas near the fumaroles, decreasing toward the interior of the caldera. This determines a zone of high slope curves coinciding with the 1000/sup 0/C/km gradient contour. In the most significant well, temperatures above 150/sup 0/C were recorded. Since this location was selected on the basis of the results of all the other studies, it is felt that a fair knowledge of the thermal flow pattern of this area has been obtained. Drilling of an additional gradient well about 200 m in depth, located on the 1000/sup 0/C/km contour, would adequately complement the information on this zone. The shallow gradient wells did not detect any significant result when located away from the zones of fumarole activity. (JGB)

  1. Phase 1 Feasibility Study, Canby Cascaded Geothermal Project, April 2, 2013

    Energy Technology Data Exchange (ETDEWEB)

    Merrick, Dale E [CanbyGeo, LLC

    2013-04-02

    A small community in Northern California is attempting to use a local geothermal resource to generate electrical power and cascade residual energy to an existing geothermal district heating system, greenhouse, and future fish farm and subsequent reinjection into the geothermal aquifer, creating a net-zero energy community, not including transportation.

  2. The GEOFAR Project - Geothermal Finance and Awareness in Europeans Regions - Development of new schemes to overcome non-technical barriers, focusing particularly on financial barriers

    Science.gov (United States)

    Poux, Adeline; Wendel, Marco; Jaudin, Florence; Hiegl, Mathias

    2010-05-01

    Numerous advantages of geothermal energy like its widespread distribution, a base-load power and availability higher than 90%, a small footprint and low carbon emissions, and the growing concerns about climate changes strongly promote the development of geothermal projects. Geothermal energy as a local energy source implies needs on surface to be located close to the geothermal resource. Many European regions dispose of a good geothermal potential but it is mostly not sufficiently developed due to non-technical barriers occurring at the very early stages of the project. The GEOFAR Project carried out within the framework of EU's "Intelligent Energy Europe" (IEE) program, gathers a consortium of European partners from Germany, France, Greece, Spain and Portugal. Launched in September 2008, the aim of this research project is to analyze the mentioned non-technical barriers, focusing most particularly on economic and financial aspects. Based on this analysis GEOFAR aims at developing new financial and administrative schemes to overcome the main financial barriers for deep geothermal projects (for electricity and direct use, without heat pumps). The analysis of the current situation and the future development of geothermal energy in GEOFAR target countries (Germany, France, Greece, Spain, Portugal, Slovakia, Bulgaria and Hungary) was necessary to understand and expose the diverging status of the geothermal sector and the more and less complicated situation for geothermal projects in different Europeans Regions. A deeper analysis of 40 cases studies (operating, planned and failed projects) of deep geothermal projects also contributed to this detailed view. An exhaustive analysis and description of financial mechanisms already existing in different European countries and at European level to support investors completed the research on non-technical barriers. Based on this profound analysis, the GEOFAR project has made an overview of the difficulties met by project

  3. Operational and support concept for an exploratory company for deep geothermal energy; Betriebs- und Traegerschaftskonzept fuer eine Explorationsgesellschaft der tiefen Geothermie - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Keiser, U.; Goetz, R.; Glorr, R. Ch.

    2009-08-15

    This final report for the Swiss Federal Office of Energy (SFOE) reports on an iterative process that involved a large number of representatives. These instances dealt with the entire value creation chain of projects concerning deep geothermal energy. The experts involved are listed. A series of workshops dealt with the knowledge thus obtained. The starting point of the process and the goals aimed for are discussed, as is the current situation regarding deep geothermal energy. The organisation and management of exploration projects are discussed as are investment costs and cost effectiveness. The financing of projects, operational and funding aspects are discussed. The need for action is examined and recommendations for further action are made. An appendix contains descriptions of representative examples and their costs.

  4. Niland development project geothermal loan guaranty: 49-MW (net) power plant and geothermal well field development, Imperial County, California: Environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    1984-10-01

    The proposed federal action addressed by this environmental assessment is the authorization of disbursements under a loan guaranteed by the US Department of Energy for the Niland Geothermal Energy Program. The disbursements will partially finance the development of a geothermal well field in the Imperial Valley of California to supply a 25-MW(e) (net) power plant. Phase I of the project is the production of 25 MW(e) (net) of power; the full rate of 49 MW (net) would be achieved during Phase II. The project is located on approximately 1600 acres (648 ha) near the city of Niland in Imperial County, California. Well field development includes the initial drilling of 8 production wells for Phase I, 8 production wells for Phase II, and the possible need for as many as 16 replacement wells over the anticipated 30-year life of the facility. Activities associated with the power plant in addition to operation are excavation and construction of the facility and associated systems (such as cooling towers). Significant environmental impacts, as defined in Council on Environmental Quality regulation 40 CFR Part 1508.27, are not expected to occur as a result of this project. Minor impacts could include the following: local degradation of ambient air quality due to particulate and/or hydrogen sulfide emissions, temporarily increased ambient noise levels due to drilling and construction activities, and increased traffic. Impacts could be significant in the event of a major spill of geothermal fluid, which could contaminate groundwater and surface waters and alter or eliminate nearby habitat. Careful land use planning and engineering design, implementation of mitigation measures for pollution control, and design and implementation of an environmental monitoring program that can provide an early indication of potential problems should ensure that impacts, except for certain accidents, will be minimized.

  5. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    International Nuclear Information System (INIS)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed

  6. Surveys of forest bird populations found in the vicinity of proposed geothermal project subzones in the district of Puna, Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Jacobi, J.D.; Reynolds, M.; Ritchotte, G.; Nielsen, B.; Viggiano, A.; Dwyer, J.

    1994-10-01

    This report presents data on the distribution and status of forest bird species found within the vicinity of proposed geothermal resource development on the Island of Hawaii. Potential impacts of the proposed development on the native bird populations found in the project are are addressed.

  7. Two 175 ton geothermal chiller heat pumps for leed platinum building technology demonstration project. Operation data, data collection and marketing

    Energy Technology Data Exchange (ETDEWEB)

    Kolo, Daniel [Johnson Controls, Inc., Glendale, WI (United States)

    2016-08-15

    The activities funded by this grant helped educate and inform approximately six thousand individuals who participated in guided tours of the geothermal chiller plant at Johnson Controls Corporate Headquarters in Glendale, Wisconsin over the three year term of the project. In addition to those who took the formal tour, thousands more were exposed to hands-on learning at the self-service video kiosks located in the headquarters building and augmented reality tablet app that allowed for self-guided tours. The tours, video, and app focused on the advantages of geothermal heat pump chillers, including energy savings and environmental impact. The overall tour and collateral also demonstrated the practical application of this technology and how it can be designed into a system that includes many other sustainable technologies without sacrificing comfort or health of building occupants Among tour participants were nearly 1,000 individuals, representing 130 organizations identified as potential purchasers of geothermal heat pump chillers. In addition to these commercial clients, tours were well attended by engineering, facilities, and business trade groups. This has also been a popular tour for groups from Universities around the Midwest and K-12 schools from Wisconsin and Northern Illinois A sequence of operations was put into place to control the chillers and they have been tuned and maintained to optimize the benefit from the geothermal water loop. Data on incoming and outgoing water temperature and flow from the geothermal field was logged and sent to DOE monthly during the grant period to demonstrate energy savings.

  8. Project GeoPower: Basic subsurface information for the utilization of geothermal energy in the Danish-German border region

    DEFF Research Database (Denmark)

    Kirsch, Reinhard; Balling, Niels; Fuchs, Sven

    and require reliable cross-border management and planning tools. In the framework of the Interreg4a GeoPower project, fundamental geological and geophysical information of importance for the planning of geothermal energy utilization in the Danish-German border region was compiled and analyzed. A 3D geological......Information on both hydraulic and thermal conditions of the subsurface is fundamental for the planning and use of hydrothermal energy. This is paramount in particular for densely populated international border regions, where different subsurface applications may introduce conflicts of use...... on potential geothermal reservoirs, and a new 3D structural geological model was developed. The interpretation of petrophysical data (core data and well logs) allows to evaluate the hydraulic and thermal rock properties of geothermal formations and to develop a parameterized 3D thermal conductive subsurface...

  9. Draft environmental statement. Homestake Mining Company: Homestake Mining Company Pitch Project (Saguache County, Colorado)

    International Nuclear Information System (INIS)

    1978-01-01

    The draft concerns the proposed issuance of approvals, permits, and licenses to the Homestake Mining Company for the implementation of the Pitch Project. The Pitch Project consists of mining and milling operations involving uranium ore deposits located in Gunnison National Forest, Saguache County, Colorado. Mining of uranium ore will take place over an estimated period of 20 years; a mill with a nominal capacity of 544 metric tons per day (600 tons per day) will be constructed and operated as long as ore is available. The waste material (tailings) from the mill, also produced at a rate of about 544 metric tons per day (600 tons per day), will be buried onsite at the head end of a natural valley. The environmental impacts are summarized in sections on the existing environment, applicant's proposed mining and milling operation, environmental effects of accidents, monitoring programs, productivity, commitment of resources, alternatives, and cost-benefit evaluation

  10. The EGS Collab Project: Stimulation Investigations for Geothermal Modeling Analysis and Validation

    Science.gov (United States)

    Blankenship, D.; Kneafsey, T. J.

    2017-12-01

    The US DOE's EGS Collab project team is establishing a suite of intermediate-scale ( 10-20 m) field test beds for coupled stimulation and interwell flow tests. The multiple national laboratory and university team is designing the tests to compare measured data to models to improve measurement and modeling toolsets available for use in field sites and investigations such as DOE's Frontier Observatory for Research in Geothermal Energy (FORGE) Project. Our tests will be well-controlled, in situexperiments focused on rock fracture behavior, seismicity, and permeability enhancement. Pre- and post-test modeling will allow for model prediction and validation. High-quality, high-resolution geophysical and other fracture characterization data will be collected, analyzed, and compared with models and field observations to further elucidate the basic relationships between stress, induced seismicity, and permeability enhancement. Coring through the stimulated zone after tests will provide fracture characteristics that can be compared to monitoring data and model predictions. We will also observe and quantify other key governing parameters that impact permeability, and attempt to understand how these parameters might change throughout the development and operation of an Enhanced Geothermal System (EGS) project with the goal of enabling commercial viability of EGS. The Collab team will perform three major experiments over the three-year project duration. Experiment 1, intended to investigate hydraulic fracturing, will be performed in the Sanford Underground Research Facility (SURF) at 4,850 feet depth and will build on kISMET Project findings. Experiment 2 will be designed to investigate hydroshearing. Experiment 3 will investigate changes in fracturing strategies and will be further specified as the project proceeds. The tests will provide quantitative insights into the nature of stimulation (e.g., hydraulic fracturing, hydroshearing, mixed-mode fracturing, thermal fracturing

  11. Geothermal energy in the western United States and Hawaii: Resources and projected electricity generation supplies

    International Nuclear Information System (INIS)

    1991-09-01

    Geothermal energy comes from the internal heat of the Earth, and has been continuously exploited for the production of electricity in the United States since 1960. Currently, geothermal power is one of the ready-to-use baseload electricity generating technologies that is competing in the western United States with fossil fuel, nuclear and hydroelectric generation technologies to provide utilities and their customers with a reliable and economic source of electric power. Furthermore, the development of domestic geothermal resources, as an alternative to fossil fuel combustion technologies, has a number of associated environmental benefits. This report serves two functions. First, it provides a description of geothermal technology and a progress report on the commercial status of geothermal electric power generation. Second, it addresses the question of how much electricity might be competitively produced from the geothermal resource base. 19 figs., 15 tabs

  12. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    Science.gov (United States)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  13. Esmeralda Energy Company, Final Scientific Technical Report, January 2008. Emigrant Slimhole Drilling Project, DOE GRED III

    Energy Technology Data Exchange (ETDEWEB)

    Deymonaz, John [Fish Lake Green Power Co. (United States); Hulen, Jeffrey B. [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geosciences Inst.; Nash, Gregory D. [Univ. of Utah, Salt Lake City, UT (United States). Energy and Geosciences Inst.; Schriener, Alex [Earth Systems Southwest (United States)

    2008-01-22

    The Emigrant Slimhole Drilling Project (ESDP) was a highly successful, phased resource evaluation program designed to evaluate the commercial geothermal potential of the eastern margin of the northern Fish Lake Valley pull-apart basin in west-central Nevada. The program involved three phases: (1) Resource evaluation; (2) Drilling and resource characterization; and (3) Resource testing and assessment. Efforts included detailed geologic mapping; 3-D modeling; compilation of a GIS database; and production of a conceptual geologic model followed by the successful drilling of the 2,938 foot deep 17-31 slimhole (core hole), which encountered commercial geothermal temperatures (327⁰ F) and exhibits an increasing, conductive, temperature gradient to total depth; completion of a short injection test; and compilation of a detailed geologic core log and revised geologic cross-sections. Results of the project greatly increased the understanding of the geologic model controlling the Emigrant geothermal resource. Information gained from the 17-31 core hole revealed the existence of commercial temperatures beneath the area in the Silver Peak Core Complex which is composed of formations that exhibit excellent reservoir characteristics. Knowledge gained from the ESDP may lead to the development of a new commercial geothermal field in Nevada. Completion of the 17-31 core hole also demonstrated the cost-effectiveness of deep core drilling as an exploration tool and the unequaled value of core in understanding the geology, mineralogy, evolutional history and structural aspects of a geothermal resource.

  14. Effective Project Risk management in Micro Companies : Case study for Persona Optima Iceland ehf.

    OpenAIRE

    Bražinskaitė, Justina

    2011-01-01

    This study is meant to be a guide for micro companies regarding effective project risk management. The main purpose of this thesis is to introduce project risk management and build a user-friendly managerial model toward effective project risk management in micro companies. The research is based on a case company Persona Optima Iceland ehf. analysis. The study investigates risk management, uncertainties and risks in projects, project risk management, its models and particularities in orde...

  15. Southwest regional geothermal operations research program. Summary report. First project year, June 1977--August 1978

    Energy Technology Data Exchange (ETDEWEB)

    Meyer, R.T.; Davidson, R.

    1978-12-01

    A summary report is given of the information, data, and results presented by New Mexico Energy Institute and the five State Teams in their separate draft reports. The objective is to develop scenarios for the development of each identified geothermal resource area in Arizona, Colorado, Nevada, New Mexico and Utah. Included are an overview; an economic analysis; institutitional procedures, contraints, and incentives; location of geothermal resources in the southwest; geothermal development postulations, state by state; and recommended actions for promoting and accelerating geothermal development. (MHR)

  16. Recent drilling activities at the earth power resources Tuscarora geothermal power project's hot sulphur springs lease area.

    Energy Technology Data Exchange (ETDEWEB)

    Goranson, Colin

    2005-03-01

    Earth Power Resources, Inc. recently completed a combined rotary/core hole to a depth of 3,813 feet at it's Hot Sulphur Springs Tuscarora Geothermal Power Project Lease Area located 70-miles north of Elko, Nevada. Previous geothermal exploration data were combined with geologic mapping and newly acquired seismic-reflection data to identify a northerly tending horst-graben structure approximately 2,000 feet wide by at least 6,000 feet long with up to 1,700 feet of vertical offset. The well (HSS-2) was successfully drilled through a shallow thick sequence of altered Tertiary Volcanic where previous exploration wells had severe hole-caving problems. The ''tight-hole'' drilling problems were reduced using drilling fluids consisting of Polymer-based mud mixed with 2% Potassium Chloride (KCl) to reduce Smectite-type clay swelling problems. Core from the 330 F fractured geothermal reservoir system at depths of 2,950 feet indicated 30% Smectite type clays existed in a fault-gouge zone where total loss of circulation occurred during coring. Smectite-type clays are not typically expected at temperatures above 300 F. The fracture zone at 2,950 feet exhibited a skin-damage during injection testing suggesting that the drilling fluids may have caused clay swelling and subsequent geothermal reservoir formation damage. The recent well drilling experiences indicate that drilling problems in the shallow clays at Hot Sulphur Springs can be reduced. In addition, average penetration rates through the caprock system can be on the order of 25 to 35 feet per hour. This information has greatly reduced the original estimated well costs that were based on previous exploration drilling efforts. Successful production formation drilling will depend on finding drilling fluids that will not cause formation damage in the Smectite-rich fractured geothermal reservoir system. Information obtained at Hot Sulphur Springs may apply to other geothermal systems developed in

  17. Bibliography of documents and related materials collected for the Hawaii Geothermal Project Environmental Impact Statement

    Energy Technology Data Exchange (ETDEWEB)

    Glenn, F.M.; Boston, C.R.; Burns, J.C.; Hagan, C.W. Jr.; Saulsbury, J.W.; Wolfe, A.K.

    1995-03-01

    This report has been prepared to make available and archive information developed during preparation of the Environmental Impact Statement for Phases 3 and 4 of the Hawaii Geothermal Project as defined by the state of Hawaii in its April 1989 proposal to Congress. On May 17, 1994, the USDOE published a notice in the Federal Register withdrawing its Notice of Intent of February 14, 1992, to prepare the HGP EIS. Since the state of Hawaii is no longer pursuing or planning to pursue the HGP, DOE considers the project to be terminated. This report provides a bibliography of documents, published papers, and other reference materials that were obtained or used. The report provides citations for approximately 642 documents, published papers, and other reference materials that were gathered to describe the potentially affected environment on the islands of Hawaii, Maui, and Oahu. The listing also does not include all the reference materials developed by support subcontractors and cooperating agencies who participated in the project. This listing does not include correspondence or other types of personal communications. The documents listed in this report can be obtained from original sources or libraries.

  18. The ICDP Snake River Geothermal Drilling Project: preliminary overview of borehole geophysics

    Science.gov (United States)

    Schmitt, Douglas R.; Liberty, Lee M.; Kessler, James E.; Kuck, Jochem; Kofman, Randolph; Bishop, Ross; Shervais, John W.; Evans, James P.; Champion, Duane E.

    2012-01-01

    Hotspot: The Snake River Geothermal Drilling Project was undertaken to better understand the geothermal systems in three locations across the Snake River Plain with varying geological and hydrological structure. An extensive series of standard and specialized geophysical logs were obtained in each of the wells. Hydrogen-index neutron and γ-γ density logs employing active sources were deployed through the drill string, and although not fully calibrated for such a situation do provide semi-quantitative information related to the ‘stratigraphy’ of the basalt flows and on the existence of alteration minerals. Electrical resistivity logs highlight the existence of some fracture and mineralized zones. Magnetic susceptibility together with the vector magnetic field measurements display substantial variations that, in combination with laboratory measurements, may provide a tool for tracking magnetic field reversals along the borehole. Full waveform sonic logs highlight the variations in compressional and shear velocity along the borehole. These, together with the high resolution borehole seismic measurements display changes with depth that are not yet understood. The borehole seismic measurements indicate that seismic arrivals are obtained at depth in the formations and that strong seismic reflections are produced at lithological contacts seen in the corresponding core logging. Finally, oriented ultrasonic borehole televiewer images were obtained over most of the wells and these correlate well with the nearly 6 km of core obtained. This good image log to core correlations, particularly with regards to drilling induced breakouts and tensile borehole and core fractures will allow for confident estimates of stress directions and or placing constraints on stress magnitudes. Such correlations will be used to orient in core orientation giving information useful in hydrological assessments, paleomagnetic dating, and structural volcanology.

  19. Geothermal Financing Workbook

    Energy Technology Data Exchange (ETDEWEB)

    Battocletti, E.C.

    1998-02-01

    This report was prepared to help small firm search for financing for geothermal energy projects. There are various financial and economics formulas. Costs of some small overseas geothermal power projects are shown. There is much discussion of possible sources of financing, especially for overseas projects. (DJE-2005)

  20. Final Report to DOE EERE – Geothermal Technologies Program Project Title: Monitoring and modeling of fluid flow in a developing enhanced geothermal system (EGS) reservoir

    Energy Technology Data Exchange (ETDEWEB)

    Fehler, Michael [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States)

    2017-04-19

    The primary objective of this project was to improve our ability to predict performance of an Enhanced Geothermal System (EGS) reservoir over time by relating, in a quantitative manner, microseismic imaging with fluid and temperature changes within the reservoir. Historically, microseismic data have been used qualitatively to place bounds on the growth of EGS reservoirs created by large hydraulic fracturing experiments. Previous investigators used an experimentally based fracture opening relationship (fracture aperture as a function of pressure), the spatial extent of microseismic events, and some assumptions about fracture frequency to determine the size of an EGS reservoir created during large pumping tests. We addressed a number of issues (1) locating microearthquakes that occur during hydraulic fracturing, (2) obtaining more information about a reservoir than the microearthquake locations from the microearthquake data, for example, information about the seismic velocity structure of the reservoir or the scattering of seismic waves within the reservoir, (3) developing an improved methodology for estimating properties of fractures that intersect wellbores in a reservoir, and (4) developing a conceptual model for explaining the downward growth of observed seismicity that accompanies some hydraulic injections into geothermal reservoirs. We used two primary microseismic datasets for our work. The work was motivated by a dataset from the Salak Geothermal Field in Indonesia where seismicity accompanying a hydraulic injection was observed to migrate downward. We also used data from the Soultz EGS site in France. We also used Vertical Seismic Profiling data from a well in the United States. The work conducted is of benefit for characterizing reservoirs that are created by hydraulic fracturing for both EGS and for petroleum recovery.

  1. Geothermal handbook

    Science.gov (United States)

    1976-01-01

    The Bureau of Land Management offered over 400,000 hectares (one million acres) for geothermal exploration and development in 1975, and figure is expected to double this year. The Energy Research and Development Administration hopes for 10-15,000 megawatts of geothermal energy by 1985, which would require, leasing over 16.3 million hectares (37 million acres) of land, at least half of which is federal land. Since there is an 8 to 8-1/2 year time laf between initial exploration and full field development, there would have to be a ten-fold increase in the amount of federal land leased within the next three years. Seventy percent of geothermal potential, 22.3 million hectares (55 million acres), is on federal lands in the west. The implication for the Service are enormous and the problems immediate. Geothermal resource are so widespread they are found to some extent in most biomes and ecosystems in the western United States. In most cases exploitation and production of geothermal resources can be made compatible with fish and wildlife management without damage, if probable impacts are clearly understood and provided for before damage has unwittingly been allowed to occur. Planning for site suitability and concern with specific operating techniques are crucial factors. There will be opportunities for enhancement: during exploration and testing many shallow groundwater bodies may be penetrated which might be developed for wildlife use. Construction equipment and materials needed for enhancement projects will be available in areas heretofore considered remote projects will be available in areas heretofore considered remote by land managers. A comprehensive knowledge of geothermal development is necessary to avoid dangers and seize opportunities. This handbook is intended to serve as a working tool in the field. It anticipated where geothermal resource development will occur in the western United States in the near future. A set of environmental assessment procedures are

  2. Japanese geothermics

    International Nuclear Information System (INIS)

    Laplaige, P.

    1995-01-01

    At the end of the seventies, the NEDO (New Energy and Industrial Technology Development Organisation) and the Central Research Institute of Electric Power Industry have started two independent projects of deep geothermics research in Honshu island (Japan). The two sites are 50 km apart of each other and the boreholes have been drilled up to 2300 and 1100 m of depth, respectively, in hot-dry moderately fractured volcanic rocks. These sites are characterized by high geothermal gradients with a rock temperature reaching 250 C at the bottom of the wells. Hydraulic circulation tests are still in progress to evaluate the profitability of these sites. (J.S.). 1 fig., 1 photo

  3. Deep geothermics

    International Nuclear Information System (INIS)

    Anon.

    1995-01-01

    The hot-dry-rocks located at 3-4 km of depth correspond to low permeable rocks carrying a large amount of heat. The extraction of this heat usually requires artificial hydraulic fracturing of the rock to increase its permeability before water injection. Hot-dry-rocks geothermics or deep geothermics is not today a commercial channel but only a scientific and technological research field. The Soultz-sous-Forets site (Northern Alsace, France) is characterized by a 6 degrees per meter geothermal gradient and is used as a natural laboratory for deep geothermal and geological studies in the framework of a European research program. Two boreholes have been drilled up to 3600 m of depth in the highly-fractured granite massif beneath the site. The aim is to create a deep heat exchanger using only the natural fracturing for water transfer. A consortium of german, french and italian industrial companies (Pfalzwerke, Badenwerk, EdF and Enel) has been created for a more active participation to the pilot phase. (J.S.). 1 fig., 2 photos

  4. DETERMINANTS AFFECTING THE SUCCESS OF DISTRIBUTION GRID PROJECTS IN BINH THUAN POWER COMPANY, VIETNAM

    OpenAIRE

    Pham Van Tai* & Le Duc Thu

    2017-01-01

    The research identified the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company, clarify the mutual relationship between the critical factors affecting the success of the distribution grid project in Binh Thuan Power Company and recommended and rated the solution to enhance the success of the distribution grid project in Binh Thuan Power Company. The research had found fours critical factors: External factors of project, Controlling and coordina...

  5. Geothermal energy in Jordan

    International Nuclear Information System (INIS)

    Al-Dabbas, Moh'd A. F.

    1993-11-01

    The potential of geothermal energy utilization in Jordan was discussed. The report gave a summary of the location of geothermal anomalies in Jordan, and of ongoing projects that utilize geothermal energy for greenhouse heating, fish farming, refrigeration by absorption, and water desalination of deep aquifers. The problems facing the utilization of geothermal energy in Jordan were identified to be financial (i.e. insufficient allocation of local funding, and difficulty in getting foreign financing), and inadequate expertise in the field of geothermal energy applications. The report gave a historical account of geothermal energy utilization activities in Jordan, including cooperation activities with international organizations and foreign countries. A total of 19 reports already prepared in the areas of geochemical and hydrological studies were identified. The report concluded that the utilization of geothermal energy offers some interesting economic possibilities. (A.M.H.). 4 refs. 1 map

  6. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final: Comments and Responses to Comments

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This document is the Comments and Responses to Comments volume of the Final Environmental Impact Statement and Environmental Impact Report prepared for the proposed Telephone Flat Geothermal Development Project (Final EIS/EIR). This volume of the Final EIS/EIR provides copies of the written comments received on the Draft EIS/EIR and the leady agency responses to those comments in conformance with the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA).

  7. The GRETA project: the contribution of near-surface geothermal energy for the energetic self-sufficiency of Alpine regions

    Directory of Open Access Journals (Sweden)

    Alessandro Casasso

    2017-03-01

    Full Text Available The Alpine regions are deeply involved in the challenge set by climate change, which is a threat for their environment and for important economic activities such as tourism. The heating and cooling of buildings account for a major share of the total primary energy consumption in Europe, and hence the energy policies should focus on this sector to achieve the greenhouse gas reduction targets set by international agreements. Geothermal heat pump is one of the least carbon-intensive technologies for the heating and cooling of buildings. It exploits the heat stored within the ground, a local renewable energy source which is widely available across the Alpine territory. Nevertheless, it has been little considered by European policies and cooperation projects. GRETA (near-surface Geothermal REsources in the Territory of the Alpine space is a cooperation project funded by the EU INTERREG-Alpine Space program, aiming at demonstrating the potential of shallow geothermal energy and to foster its integration into energy planning instruments. It started in December 2015 and will last three years, involving 12 partners from Italy, France, Switzerland, Germany, Austria, and Slovenia. In this paper, the project is presented, along with the results of the first year of work.

  8. Utilising geothermal energy in Victoria

    International Nuclear Information System (INIS)

    Driscoll, Jim

    2006-01-01

    Geothermal energy is generated from the radioactive decay of naturally occurring isotopes and about 20% is generated from primordial heat associated with the formation of the earth. Geothermal project reduce energy and water cost and reduces greenhouse gas emissions

  9. Geothermal Program Review X: proceedings. Geothermal Energy and the Utility Market -- the Opportunities and Challenges for Expanding Geothermal Energy in a Competitive Supply Market

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    Each year the Geothermal Division of the US Department of Energy conducts an in-depth review of its entire geothermal R&D program. The conference serves several purposes: a status report on current R&D activities, an assessment of progress and problems, a review of management issues, and a technology transfer opportunity between DOE and the US geothermal city. This year`s conference, Program Review X, was held in San Francisco on March 24--26, 1992. The theme of the review, ``Geothermal Energy and the Utility Market -- The Opportunities and Challenges for Expanding Geothermal Energy in a Competitive Supply Market,`` focused on the needs of the electric utility sector. Geothermal energy, with its power capacity potential of 10 GWe by the year 2010, can provide reliable, enviromentally clean electricity which can help offset the projected increase in demand. Program Review X consisted of seven sessions including an opening session with presentations by Mr. Vikram Budhraja, Vice President of System Planning and Operations, Southern California Edison Company, and Mr. Richard Jaros, President and Chief Operating Officer, California Energy Company. The six technical sessions included presentations by the relevant field researchers covering DOE-sponsored R&D in hydrothermal, hot dry rock, and geopressured energy. Individual projects are processed separately for the data bases.

  10. Three-dimensional numerical reservoir simulation of the EGS Demonstration Project at The Geysers geothermal field

    Science.gov (United States)

    Borgia, Andrea; Rutqvist, Jonny; Oldenburg, Curt M.; Hutchings, Lawrence; Garcia, Julio; Walters, Mark; Hartline, Craig; Jeanne, Pierre; Dobson, Patrick; Boyle, Katie

    2013-04-01

    The Enhanced Geothermal System (EGS) Demonstration Project, currently underway at the Northwest Geysers, California, aims to demonstrate the feasibility of stimulating a deep high-temperature reservoir (up to 400 °C) through water injection over a 2-year period. On October 6, 2011, injection of 25 l/s started from the Prati 32 well at a depth interval of 1850-2699 m below sea level. After a period of almost 2 months, the injection rate was raised to 63 l/s. The flow rate was then decreased to 44 l/s after an additional 3.5 months and maintained at 25 l/s up to August 20, 2012. Significant well-head pressure changes were recorded at Prati State 31 well, which is separated from Prati 32 by about 500 m at reservoir level. More subdued pressure increases occur at greater distances. The water injection caused induced seismicity in the reservoir in the vicinity of the well. Microseismic monitoring and interpretation shows that the cloud of seismic events is mainly located in the granitic intrusion below the injection zone, forming a cluster elongated SSE-NNW (azimuth 170°) that dips steeply to the west. In general, the magnitude of the events increases with depth and the hypocenter depth increases with time. This seismic cloud is hypothesized to correlate with enhanced permeability in the high-temperature reservoir and its variation with time. Based on the existing borehole data, we use the GMS™ GUI to construct a realistic three-dimensional (3D) geologic model of the Northwest Geysers geothermal field. This model includes, from the top down, a low permeability graywacke layer that forms the caprock for the reservoir, an isothermal steam zone (known as the normal temperature reservoir) within metagraywacke, a hornfels zone (where the high-temperature reservoir is located), and a felsite layer that is assumed to extend downward to the magmatic heat source. We then map this model onto a rectangular grid for use with the TOUGH2 multiphase, multicomponent, non

  11. MARKETING STRATEGIES AND TACTICS OF ADVERTISING PROJECTS FOR TOURISM COMPANIES

    Directory of Open Access Journals (Sweden)

    O. M. Tolmachev

    2016-01-01

    Full Text Available The subject / topic. The relevance of the article is that today tourism is a massive social and economic phenomenon of global scale, as is known, any vacation begins with advertising. Therefore, for the progressive development of tourism companies need to develop an eff ective strategy and tactics of advertising projects. Potential consumers have become more discerning and prudent, so a consultant position with the fl ood of information does not work. Works expert position, when the product is as if created for the client, that is, the product exists only in synchronism with the buyer. In view of this increased competition between operators of tourist services, and certain segments of the market saturation of a significant amount of travel products with a similar orientation, a unique role for the positioning on the basis of marketing strategy as a process for creating a unique tourism product in the market.The purpose / goal. The aim of the article is to study the features of the marketing strategies of advertising processes in the market of travel agencies and find directions of their improvement in current economic conditions.Article Objectives: To investigate the nature and content of the concept of "marketing strategy of advertising processes"; systematize criteria for the classification of the Company's strategy in the market of tourist services; analyze the features of advertising projects and identify promising directions for improving the marketing strategies.Methodology. The methodological basis of this article are comparative analysis methods.Results. The essence and content of the concept of "marketing strategy of advertising processes." The features of the market of tourist services, allocated target audiences, identifies key factors and trends in the development of this market.The new system is a product of values, square S. Kovalev, who identified four existing mentality of the person. When advertising article or video include

  12. Nevada Southwest Regional Geothermal Development Operations Research Project. Appendix 8 of regional operations research program for development of geothermal energy in the Southwest United States. Final technical report, June 1977--August 1978

    Energy Technology Data Exchange (ETDEWEB)

    Clark, Noel A.; Booth, G. Martin, III; Weber, Dorismae; Helseth, Barbara K.

    1979-01-01

    By the end of the first year of the Southwest Regional Geothermal Project, the Nevada State Team has defined over 300 geothermal sites. Because of the multitude of sites and data, scenarios for this first project-year have been completed for the twenty-six Nevada Geothermal Areas, which include all the specific sites. It is not improbable that fully one-third of the sites will eventually prove to be of high to intermediate temperature (i.e. > 150 C and 90-150 C) resources. Low temperature sites are also prominent, not only in number, but also in their distribution--each of Nevada's 17 counties has several such sites.

  13. Geothermal Today - 1999

    Energy Technology Data Exchange (ETDEWEB)

    None

    2000-05-01

    U.S. Department of Energy 1999 Geothermal Energy Program Highlights The Hot Facts Getting into Hot Water Turning Waste water into Clean Energy Producing Even Cleaner Power Drilling Faster and Cheaper Program in Review 1999: The Year in Review JanuaryCal Energy announced sale of Coso geothermal power plants at China Lake, California, to Caithness Energy, for $277 million. U.S. Export-Import Bank completed a $50 million refinancing of the Leyte Geothermal Optimization Project in the Philippines. F

  14. 3D Groundwater flow model at the Upper Rhine Graben scale to delineate preferential target areas for geothermal projects

    Science.gov (United States)

    Armandine Les Landes, Antoine; Guillon, Théophile; Peter-Borie, Mariane; Rachez, Xavier

    2017-04-01

    Any deep unconventional geothermal project remains risky because of the uncertainty regarding the presence of the geothermal resource at depth and the drilling costs increasing accordingly. That's why this resource must be located as precisely as possible to increase the chances of successful projects and their economic viability. To minimize the risk, as much information as possible should be gathered prior to any drilling. Usually, the position of the exploration wells of geothermal energy systems is chosen based on structural geology observations, geophysics measurements and geochemical analyses. Confronting these observations to results from additional disciplines should bring more objectivity in locating the region to explore and where to implant the geothermal system. The Upper Rhine Graben (URG) is a tectonically active rift system that corresponds to one branch of the European Cenozoic Rift System where the basin hosts a significant potential for geothermal energy. The large fault network inherited from a complex tectonic history and settled under the sedimentary deposits hosts fluid circulation patterns. Geothermal anomalies are strongly influenced by fluid circulations within permeable structures such as fault zones. In order to better predict the location of the geothermal resource, it is necessary to understand how it is influenced by heat transport mechanisms such as groundwater flow. The understanding of fluid circulation in hot fractured media at large scale can help in the identification of preferential zones at a finer scale where additional exploration can be carried out. Numerical simulations is a useful tool to deal with the issue of fluid circulations through large fault networks that enable the uplift of deep and hot fluids. Therefore, we build a numerical model to study groundwater flow at the URG scale (150 x 130km), which aims to delineate preferential zones. The numerical model is based on a hybrid method using a Discrete Fracture Network

  15. Geothermal energy and the utility market -- the opportunities and challenges for expanding geothermal energy in a competitive supply market: Proceedings

    Energy Technology Data Exchange (ETDEWEB)

    1992-01-01

    Each year the Geothermal Division of the US Department of Energy conducts an in-depth review of its entire geothermal R D program. The conference serves several purposes: a status report on current R D activities, an assessment of progress and problems, a review of management issues, and a technology transfer opportunity between DOE and the US geothermal city. This year's conference, Program Review X, was held in San Francisco on March 24--26, 1992. The theme of the review, Geothermal Energy and the Utility Market -- The Opportunities and Challenges for Expanding Geothermal Energy in a Competitive Supply Market,'' focused on the needs of the electric utility sector. Geothermal energy, with its power capacity potential of 10 GWe by the year 2010, can provide reliable, enviromentally clean electricity which can help offset the projected increase in demand. Program Review X consisted of seven sessions including an opening session with presentations by Mr. Vikram Budhraja, Vice President of System Planning and Operations, Southern California Edison Company, and Mr. Richard Jaros, President and Chief Operating Officer, California Energy Company. The six technical sessions included presentations by the relevant field researchers covering DOE-sponsored R D in hydrothermal, hot dry rock, and geopressured energy. Individual projects are processed separately for the data bases.

  16. Environmental summary document for the Republic Geothermal, Inc. application for a geothermal loan guaranty project: 64 MW well field and 48 MW (net) geothermal power plant

    Energy Technology Data Exchange (ETDEWEB)

    Layton, D.W.; Powers, D.J.; Leitner, P.; Crow, N.B.; Gudiksen, P.H.; Ricker, Y.E.

    1979-07-01

    A comprehensive review and analysis is provided of the environmental consequences of (1) guaranteeing a load for the completion of the 64 MW well field and the 48 MW (net) power plant or (2) denying a guaranteed load that is needed to finish the project. Mitigation measures are discussed. Alternatives and their impacts are compared and some discussion is included on unavoidable adverse impacts. (MHR)

  17. 77 FR 38796 - Alabama Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for...

    Science.gov (United States)

    2012-06-29

    ... Power Company; Holt Hydroelectric Project; Notice of Revised Restricted Service List for a Programmatic... Hydroelectric Project No. 2203. The programmatic agreement, when executed by the Commission, the Alabama SHPO...

  18. Finding ways to say 'yes': report of the Laurier Avenue geothermal project

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-09-30

    RESCo Energy Inc. (RESCo), Booz Engineering and R. Mancini And Associates were requested by Laurier Avenue residents and the Don Vale Cabbagetown Residents Association Inc. to work together to provide an engineering study on the feasibility of using geo-exchange heating and cooling for the heritage homes in the Laurier Avenue neighbourhood. The main purpose of the analysis was to examine the potential application of geothermal heating and other energy efficiency technologies in a heritage neighbourhood in Toronto. The study was also designed to evaluate the options to preserve ground-water run-off using permeable pavement solutions during road reconstruction. Aside from the comparison between existing technologies, this project also integrates political, bureaucratic, legal and financing aspects. Baseline conditions of the homes were identified and eco-energy audits were performed on some of them. Energy efficiencies are generally low in these homes and heating systems are not appropriate. Nevertheless, utility costs are generally moderate thanks to the small size and the proximity of the houses. Although they are effective, geo-exchange systems are expensive and still difficult to implement in an urban environment. The challenges they have to face involve using city property for borefields, heritage concerns, archaeological preservation and financial aspects. The scope of the study includes other efficiency technologies such as air source heat pumps, home air sealing and insulation upgrades and high efficiency hot water systems. The potential for electricity generation using renewable energy is limited by the site conditions. Considering Toronto's ambitions regarding energy-efficiency and GHG reductions, it will be necessary to identify solutions to reduce bureaucratic barriers to citizen initiatives like the one described here.

  19. Environmental assessment: Raft River geothermal project pilot plant, Cassia County, Idaho

    Energy Technology Data Exchange (ETDEWEB)

    1979-09-01

    The action assessed here is the construction and operation of a 5- to 6-MW(e) (gross) geothermal pilot plant in the Raft River Valley of southern Idaho. This project was originally planned as a thermal test loop using a turbine simulator valve. The test loop facility (without the simulator valve) is now under construction. The current environmental assessment addresses the complete system including the addition of a turbine-generator and its associated switching gear in place of the simulator valve. The addition of the turbine-generator will result in a net production of 2.5 to 3.5 MW(e) with a commensurate reduction in waste heat to the cooling tower and will require the upgrading of existing transmission lines for offsite delivery of generated power. Construction of the facility will require disturbance of approximately 20 ha (50 acres) for the facility itself and approximately 22.5 ha (57 acres) for construction of drilling pads and ponds, pipelines, and roads. Existing transmission lines will be upgraded for the utility system interface. Interference with alternate land uses will be minimal. Loss of wildlife habitat will be acceptable, and US Fish and Wildlife Service recommendations for protection of raptor nesting sites, riparian vegetation, and other important habitats will be observed. During construction, noise levels may reach 100 dBA at 15 m (50 ft) from well sites, but wildlife and local residents should not be significantly affected if extended construction is not carried out within 0.5 km (0.3 miles) of residences or sensitive wildlife habitat. Water use during construction will not be large and impacts on competing uses are unlikely.

  20. Finding ways to say 'yes': report of the Laurier Avenue geothermal project

    International Nuclear Information System (INIS)

    2010-01-01

    RESCo Energy Inc. (RESCo), Booz Engineering and R. Mancini And Associates were requested by Laurier Avenue residents and the Don Vale Cabbagetown Residents Association Inc. to work together to provide an engineering study on the feasibility of using geo-exchange heating and cooling for the heritage homes in the Laurier Avenue neighbourhood. The main purpose of the analysis was to examine the potential application of geothermal heating and other energy efficiency technologies in a heritage neighbourhood in Toronto. The study was also designed to evaluate the options to preserve ground-water run-off using permeable pavement solutions during road reconstruction. Aside from the comparison between existing technologies, this project also integrates political, bureaucratic, legal and financing aspects. Baseline conditions of the homes were identified and eco-energy audits were performed on some of them. Energy efficiencies are generally low in these homes and heating systems are not appropriate. Nevertheless, utility costs are generally moderate thanks to the small size and the proximity of the houses. Although they are effective, geo-exchange systems are expensive and still difficult to implement in an urban environment. The challenges they have to face involve using city property for borefields, heritage concerns, archaeological preservation and financial aspects. The scope of the study includes other efficiency technologies such as air source heat pumps, home air sealing and insulation upgrades and high efficiency hot water systems. The potential for electricity generation using renewable energy is limited by the site conditions. Considering Toronto's ambitions regarding energy-efficiency and GHG reductions, it will be necessary to identify solutions to reduce bureaucratic barriers to citizen initiatives like the one described here.

  1. Case Writing Projects in Co-Operation with Companies and Organizations

    OpenAIRE

    Bengtsson, Lars; Asplund, Carl-Johan

    2008-01-01

    The purpose of this paper is to present the process and evaluation of case writing projects in co-operation with companies and organizations in a course for engineering students. The case writing projects could provide an illustration and example framework for working with companies in constructing cases. Normally cases are constructed for teaching purposes in higher education. However, in order to get closer co-operation and more interest from the companies the authors encouraged the student...

  2. 75 FR 30021 - South Carolina Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference...

    Science.gov (United States)

    2010-05-28

    ... Electric and Gas Company; Saluda Hydroelectric Project; Notice of Teleconference With the National Marine... from Federal Energy Regulatory Commission (FERC) Headquarters, commencing at 2 p.m. (Eastern Standard... Project. The South Carolina Electric and Gas Company will also participate in the teleconference. All...

  3. Coordination of geothermal research

    Energy Technology Data Exchange (ETDEWEB)

    Jessop, A.M.; Drury, M.J.

    1983-01-01

    Visits were made in 1983 to various investigators and institutions in Canada to examine developments in geothermal research. Proposals for drilling geothermal wells to provide hot water for heating at a college in Prince Edward Island were made. In Alberta, the first phase of a program examining the feasibility of mapping sedimentary geothermal reservoirs was discussed. Some sites for possible geothermal demonstration projects were identified. In British Columbia, discussions were held between BC Hydro and Energy, Mines and Resources Canada on the drilling of a research hole into the peak of a temperature anomaly in the Meager Creek Valley. The British Columbia government has offered blocks of land in the Mount Cayley volcanic complex for lease to develop geothermal resources. A list of papers of interest to the Canadian geothermal energy program is appended.

  4. The geothermal power organization

    Energy Technology Data Exchange (ETDEWEB)

    Scholl, K.L. [National Renewable Energy Lab., Golden, CO (United States)

    1997-12-31

    The Geothermal Power Organization is an industry-led advisory group organized to advance the state-of-the-art in geothermal energy conversion technologies. Its goal is to generate electricity from geothermal fluids in the most cost-effective, safe, and environmentally benign manner possible. The group achieves this goal by determining the Member`s interest in potential solutions to technological problems, advising the research and development community of the needs of the geothermal energy conversion industry, and communicating research and development results among its Members. With the creation and adoption of a new charter, the Geothermal Power Organization will now assist the industry in pursuing cost-shared research and development projects with the DOE`s Office of Geothermal Technologies.

  5. Soil as natural heat resource for very shallow geothermal application: laboratory and test site updates from ITER Project

    Science.gov (United States)

    Di Sipio, Eloisa; Bertermann, David

    2017-04-01

    Nowadays renewable energy resources for heating/cooling residential and tertiary buildings and agricultural greenhouses are becoming increasingly important. In this framework, a possible, natural and valid alternative for thermal energy supply is represented by soils. In fact, since 1980 soils have been studied and used also as heat reservoir in geothermal applications, acting as a heat source (in winter) or sink (in summer) coupled mainly with heat pumps. Therefore, the knowledge of soil thermal properties and of heat and mass transfer in the soils plays an important role in modeling the performance, reliability and environmental impact in the short and long term of engineering applications. However, the soil thermal behavior varies with soil physical characteristics such as soil texture and water content. The available data are often scattered and incomplete for geothermal applications, especially very shallow geothermal systems (up to 10 m depths), so it is worthy of interest a better comprehension of how the different soil typologies (i.e. sand, loamy sand...) affect and are affected by the heat transfer exchange with very shallow geothermal installations (i.e. horizontal collector systems and special forms). Taking into consideration these premises, the ITER Project (Improving Thermal Efficiency of horizontal ground heat exchangers, http://iter-geo.eu/), funded by European Union, is here presented. An overview of physical-thermal properties variations under different moisture and load conditions for different mixtures of natural material is shown, based on laboratory and field test data. The test site, located in Eltersdorf, near Erlangen (Germany), consists of 5 trenches, filled in each with a different material, where 5 helix have been installed in an horizontal way instead of the traditional vertical option.

  6. Assessment of the Appalachian Basin Geothermal Field: Combining Risk Factors to Inform Development of Low Temperature Projects

    Science.gov (United States)

    Smith, J. D.; Whealton, C.; Camp, E. R.; Horowitz, F.; Frone, Z. S.; Jordan, T. E.; Stedinger, J. R.

    2015-12-01

    Exploration methods for deep geothermal energy projects must primarily consider whether or not a location has favorable thermal resources. Even where the thermal field is favorable, other factors may impede project development and success. A combined analysis of these factors and their uncertainty is a strategy for moving geothermal energy proposals forward from the exploration phase at the scale of a basin to the scale of a project, and further to design of geothermal systems. For a Department of Energy Geothermal Play Fairway Analysis we assessed quality metrics, which we call risk factors, in the Appalachian Basin of New York, Pennsylvania, and West Virginia. These included 1) thermal field variability, 2) productivity of natural reservoirs from which to extract heat, 3) potential for induced seismicity, and 4) presence of thermal utilization centers. The thermal field was determined using a 1D heat flow model for 13,400 bottomhole temperatures (BHT) from oil and gas wells. Steps included the development of i) a set of corrections to BHT data and ii) depth models of conductivity stratigraphy at each borehole based on generalized stratigraphy that was verified for a select set of wells. Wells are control points in a spatial statistical analysis that resulted in maps of the predicted mean thermal field properties and of the standard error of the predicted mean. Seismic risk was analyzed by comparing earthquakes and stress orientations in the basin to gravity and magnetic potential field edges at depth. Major edges in the potential fields served as interpolation boundaries for the thermal maps (Figure 1). Natural reservoirs were identified from published studies, and productivity was determined based on the expected permeability and dimensions of each reservoir. Visualizing the natural reservoirs and population centers on a map of the thermal field communicates options for viable pilot sites and project designs (Figure 1). Furthermore, combining the four risk

  7. Geothermal energy utilisation in Slowakia and its future development

    Directory of Open Access Journals (Sweden)

    Sidorová Marína

    2004-09-01

    Full Text Available Owing to favourable geological conditions Slovakia is a country abundant in occurrence of low-enthalpy sources. The government of the state sponsors new renewable ecological energy sources, among which belongs geothermal energy. Geothermal water is utilized for recreation (swimming pools, spas, agriculture (heating of greenhouses, fishing and heating of houses. Effectivity of utilisation is about 30 % due to its seasonal use. That is why the annual house-heating and hot water supply from geothermal sources are supported. Recently company Slovgeoterm has initiated heating of greenhouses in Podhajska and heating of hospital and 1231 flats in town Galanta. Nowadays, research for the biggest geothermal project in the Middle Europe – construction in Košice basin has started.

  8. Recovery Act: Geothermal Data Aggregation: Submission of Information into the National Geothermal Data System, Final Report DOE Project DE-EE0002852 June 24, 2014

    Energy Technology Data Exchange (ETDEWEB)

    Blackwell, David D. [SMU Geothermal Laboratory; Chickering Pace, Cathy [SMU Geothermal Laboratory; Richards, Maria C. [SMU Geothermal Laboratory

    2014-06-24

    The National Geothermal Data System (NGDS) is a Department of Energy funded effort to create a single cataloged source for a variety of geothermal information through a distributed network of databases made available via web services. The NGDS will help identify regions suitable for potential development and further scientific data collection and analysis of geothermal resources as a source for clean, renewable energy. A key NGDS repository or ‘node’ is located at Southern Methodist University developed by a consortium made up of: • SMU Geothermal Laboratory • Siemens Corporate Technology, a division of Siemens Corporation • Bureau of Economic Geology at the University of Texas at Austin • Cornell Energy Institute, Cornell University • Geothermal Resources Council • MLKay Technologies • Texas Tech University • University of North Dakota. The focus of resources and research encompass the United States with particular emphasis on the Gulf Coast (on and off shore), the Great Plains, and the Eastern U.S. The data collection includes the thermal, geological and geophysical characteristics of these area resources. Types of data include, but are not limited to, temperature, heat flow, thermal conductivity, radiogenic heat production, porosity, permeability, geological structure, core geophysical logs, well tests, estimated reservoir volume, in situ stress, oil and gas well fluid chemistry, oil and gas well information, and conventional and enhanced geothermal system related resources. Libraries of publications and reports are combined into a unified, accessible, catalog with links for downloading non-copyrighted items. Field notes, individual temperature logs, site maps and related resources are included to increase data collection knowledge. Additional research based on legacy data to improve quality increases our understanding of the local and regional geology and geothermal characteristics. The software to enable the integration, analysis, and

  9. Hydraulic fracturing to enhance geothermal energy recovery in deep and tight formations. Modell approach in petrothermy research project OPTIRISS

    Energy Technology Data Exchange (ETDEWEB)

    Rafiee, M.M.; Schmitz, S.; Barsch, M. [DBI - Gastechnologisches Institut gGmbH, Freiberg (Germany)

    2013-08-01

    In Germany numerous projects were successfully conducted in developments of geothermal energy which applied so far mostly for the hydrothermal deposit type. In Thuringia and Saxony there are currently project developments of geothermal resource taking into account for deep, tight formations in petrothermy and Enhanced geothermal system, (EGS). One of the potential tasks in generating these petrothermal producers and in the design of the underground power plant appears to be hydraulic fracturing with multi frac method. This is to create the heat exchanger surfaces in the rock and ensure maximum volumetric flow through it. Therefore it is very important for a sustainable heat production. However the promise of its adequate conductivity in the deep formation is one of the dominant contests in geothermal energy industry. In a multi frac method, two wells (normally horizontal wellbores at different depths) are drilled in direction of minimum horizontal stress of the formation rock. By multiple frac operation in separate sections, flow paths are generated between the wells through which it is possible to extract the heat from the rock. The numerical simulation of hydraulic fracture propagation processes in the rock is mainly from the research in the area of oil and gas industry. These techniques are mainly used for very low permeable formations in petroleum engineering (e.g. Shale gas). The development is at the beginning for EGS (e.g. granites). In this work single and multi fracking propagation processes in a synthetic example of deep hard formation are investigated. The numerical simulation is carried out to design and characterize frac processes and frac dimensions. Sensitivities to various rock parameters and different process designs are examined and optimum criteria are concluded. This shows that the minimum stress profile has the most effective role and should be modelled properly. The analysis indicates the optimum fracture length and height for adequate thermal

  10. Comprehensive Summary and Analysis of Oral and Written Scoping Comments on the Hawaii Geothermal Project EIS (DOE Review Draft)

    Energy Technology Data Exchange (ETDEWEB)

    None

    1992-09-18

    This report contains summaries of the oral and written comments received during the scoping process for the Hawaii Geothermal Project (HGP) Environmental Impact Statement (EIS). Oral comments were presented during public scoping meetings; written comments were solicited at the public scoping meetings and in the ''Advance Notice of Intent'' and ''Notice of Intent'' (published in the ''Federal Register'') to prepare the HGP EIS. This comprehensive summary of scoping inputs provides an overview of the issues that have been suggested for inclusion in the HGP EIS.

  11. Tampa electric company - IGCC project. Quarterly report, January 1, 1996--March 31, 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1998-02-01

    This quarterly report consists of materials presented at a recent review of the project. The project is an IGCC project being conducted by Tampa Electric Company. The report describes the status of the facility construction, components, operations staff training, and discusses aspects of the project which may impact the final scheduled completion.

  12. Feasibility study of Copahue geothermal development project, Argentina; Aruzenchin kyowakoku Copahue chiiki no chinetsu kaihatsu chosa

    Energy Technology Data Exchange (ETDEWEB)

    Abe, M.; Yamada, M.; Nakanishi, S.; Todaka, N. [Electric Power Development Co. Ltd., Tokyo (Japan); Fujita, T.

    1996-03-15

    Geothermal resources have been evaluated in the Copahue district. For this survey administrated by JICA, drilling of a deep test well with a small bore (COP-3) and blowout tests were conducted. This district is located at the east side of the Andes elongated in the N-S direction. Volcanoes with similar active periods and active states are distributed in the N-S direction, which forms a divide with the Pacific Ocean side. The Copahue-Caviahue composite volcano in the surveyed area is located nearly in the central part of the volcanic zone, which forms a special ring topography. Geology of the Copahue district consists of volcanic effusive rocks during the Tertiary and Quaternary periods. There are five prospecting fields with geothermal indications in the surveyed area. From the survey, an area of about 13 km{sup 2} was evaluated as a geothermal resource field. Especially, in the area of about 4 km{sup 2} including COP-1, 2 and 3 wells, the steam predominant type reservoirs were found out. As a result of estimation of the geothermal resource potential by the volumetric method, a highly prospective power generation potential of 30 MW was evaluated in the field where the steam predominant type reservoirs were confirmed by the boring wells. 7 refs., 13 figs., 1 tab.

  13. Gulf Coast geopressured-geothermal program summary report compilation. Volume 2-A: Resource description, program history, wells tested, university and company based research, site restoration

    Energy Technology Data Exchange (ETDEWEB)

    John, C.J.; Maciasz, G.; Harder, B.J.

    1998-06-01

    The US Department of Energy established a geopressured-geothermal energy program in the mid 1970`s as one response to America`s need to develop alternate energy resources in view of the increasing dependence on imported fossil fuel energy. This program continued for 17 years and approximately two hundred million dollars were expended for various types of research and well testing to thoroughly investigate this alternative energy source. This volume describes the following studies: Geopressured-geothermal resource description; Resource origin and sediment type; Gulf Coast resource extent; Resource estimates; Project history; Authorizing legislation; Program objectives; Perceived constraints; Program activities and structure; Well testing; Program management; Program cost summary; Funding history; Resource characterization; Wells of opportunity; Edna Delcambre No. 1 well; Edna Delcambre well recompletion; Fairfax Foster Sutter No. 2 well; Beulah Simon No. 2 well; P.E. Girouard No. 1 well; Prairie Canal No. 1 well; Crown Zellerbach No. 2 well; Alice C. Plantation No. 2 well; Tenneco Fee N No. 1 well; Pauline Kraft No. 1 well; Saldana well No. 2; G.M. Koelemay well No. 1; Willis Hulin No. 1 well; Investigations of other wells of opportunity; Clovis A. Kennedy No. 1 well; Watkins-Miller No. 1 well; Lucien J. Richard et al No. 1 well; and the C and K-Frank A. Godchaux, III, well No. 1.

  14. Renewability of geothermal resources

    Energy Technology Data Exchange (ETDEWEB)

    O' Sullivan, Michael; Yeh, Angus [Department of Engineering Science, University of Auckland, Auckland (New Zealand); Mannington, Warren [Contact Energy Limited, Taupo (New Zealand)

    2010-12-15

    In almost all geothermal projects worldwide, the rate of extraction of heat energy exceeds the pre-exploitation rate of heat flow from depth. For example, current production of geothermal heat from the Wairakei-Tauhara system exceeds the natural recharge of heat by a factor of 4.75. Thus, the current rate of heat extraction from Wairakei-Tauhara is not sustainable on a continuous basis, and the same statement applies to most other geothermal projects. Nevertheless, geothermal energy resources are renewable in the long-term because they would fully recover to their pre-exploitation state after an extended shut-down period. The present paper considers the general issue of the renewability of geothermal resources and uses computer modeling to investigate the renewability of the Wairakei-Tauhara system. In particular, modeling is used to simulate the recovery of Wairakei-Tauhara after it is shut down in 2053 after a hundred years of production. (author)

  15. Organizational structures of companies versus project management effectiveness

    Directory of Open Access Journals (Sweden)

    Joanna Haffer

    2012-12-01

    Full Text Available An organizational structure, indicated as one out of the four main organizational conditions supporting project management, has an essential meaning for project execution. This article, based on the research results, describes different organizational structures of project-orientated enterprises, enumerating their advantages and disadvantages, and reveals the influence of inter-organizational relations on project management effectiveness in enterprises operating in Poland. The results indicate that the more a character of inter-organizational relations is heading towards project structure, the higher project management effectiveness is. In the next sequence the project management processes are supported by strong matrix structures, whereas the worst outcomes are provided by functional structures. Simultaneously, it was concluded that project structures are conducive to high advancement of project management processes, and among them, especially project risk management processes as well as communication, time and cost management processes.

  16. 75 FR 62531 - Alabama Power Company; Project No. 349-150-Alabama Martin Dam Hydroelectric Project; Notice of...

    Science.gov (United States)

    2010-10-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Alabama Power Company; Project No. 349-150--Alabama Martin Dam Hydroelectric Project; Notice of Proposed Restricted Service List for a... the Martin Dam Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the...

  17. The company project on biomedicine. The experience of Genetrix

    International Nuclear Information System (INIS)

    Rodriguez ruiz, O.; Murcia Rivera, C.

    2007-01-01

    This case of study presents the evolution of Genetrix, a biomedicine company specialized in the creation of technological medicines based on the manipulation of mother cells. Since its beginning as the first spin-off of the Science Park of Madrid, Genetrix represents a good example of productive innovation arisen from public R+D. (Author)

  18. Geothermal Energy

    International Nuclear Information System (INIS)

    Haluska, Oscar P.; Tangir, Daniel; Perri, Matias S.

    2002-01-01

    A general overview of geothermal energy is given that includes a short description of the active and stable areas in the world. The possibilities of geothermal development in Argentina are analyzed taking into account the geothermal fields of the country. The environmental benefits of geothermal energy are outlined

  19. Organizational structures of companies versus project management effectiveness

    OpenAIRE

    Joanna Haffer

    2012-01-01

    An organizational structure, indicated as one out of the four main organizational conditions supporting project management, has an essential meaning for project execution. This article, based on the research results, describes different organizational structures of project-orientated enterprises, enumerating their advantages and disadvantages, and reveals the influence of inter-organizational relations on project management effectiveness in enterprises operating in Poland. The results indicat...

  20. Effective geothermal heat

    International Nuclear Information System (INIS)

    Abelsen, Atle

    2006-01-01

    Scandinavia's currently largest geothermal heating project: the New Ahus hospital, is briefly presented. 300-400 wells on a field outside the hospital are constructed to store energy for both heating and cooling purposes

  1. The YNP Metagenome Project: Environmental Parameters Responsible for Microbial Distribution in the Yellowstone Geothermal Ecosystem

    Directory of Open Access Journals (Sweden)

    William P. Inskeep

    2013-05-01

    Full Text Available The Yellowstone geothermal complex contains over 10,000 diverse geothermal features that host numerous phylogenetically deeply-rooted and poorly understood archaea, bacteria and viruses. Microbial communities in high-temperature environments are generally less diverse than soil, marine, sediment or lake habitats and therefore offer a tremendous opportunity for studying the structure and function of different model microbial communities using environmental metagenomics. One of the broader goals of this study was to establish linkages among microbial distribution, metabolic potential and environmental variables. Twenty geochemically distinct geothermal ecosystems representing a broad spectrum of Yellowstone hot-spring environments were used for metagenomic and geochemical analysis and included approximately equal numbers of: (1 phototrophic mats, (2 ‘filamentous streamer’ communities, and (3 archaeal-dominated sediments. The metagenomes were analyzed using a suite of complementary and integrative bioinformatic tools, including phylogenetic and functional analysis of both individual sequence reads and assemblies of predominant phylotypes. This volume identifies major environmental determinants of a large number of thermophilic microbial lineages, many of which have not been fully described in the literature nor previously cultivated to enable functional and genomic analyses. Moreover, protein family abundance comparisons and in-depth analyses of specific genes and metabolic pathways relevant to these hot-spring environments reveal hallmark signatures of metabolic capabilities that parallel the distribution of phylotypes across specific types of geochemical environments.

  2. 77 FR 14516 - Alabama Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted...

    Science.gov (United States)

    2012-03-12

    ... Power Company, Martin Dam Hydroelectric Project; Notice of Proposed Revised Restricted Service List for... for inclusion in, the National Register of Historic Places at the Martin Dam Hydroelectric Project...)). The Commission's responsibilities pursuant to section 106 for the Martin Dam Hydroelectric Project...

  3. 77 FR 38796 - Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted...

    Science.gov (United States)

    2012-06-29

    ... Alabama] Georgia Power Company; Bartletts Ferry Hydroelectric Project; Notice of Revised Restricted... by issuance of a new license for the Bartletts Ferry Hydroelectric Project No. 485. The programmatic... Hydroelectric Project. On June 14, 2012, the Kialegee Tribal Town requested a revision to the restricted service...

  4. Maturity of project management in construction companies with the use of fuzzy numbers

    Science.gov (United States)

    Klaus-Rosińska, Agata; Kuchta, Dorota

    2017-07-01

    The main aim of the article is to describe issue of maturity in project management regarding construction companies. Taking into consideration this problem the literature research was made, existing project management maturity models were analyzed, model of maturity in project management (using fuzzy numbers approach) was described and tested. The results of testing stage are shown in the case study.

  5. Factors that Impact Software Project Success in Offshore Information Technology (IT) Companies

    Science.gov (United States)

    Edara, Venkatarao

    2011-01-01

    Information technology (IT) projects are unsuccessful at a rate of 65% to 75% per year, in spite of employing the latest technologies and training employees. Although many studies have been conducted on project successes in U.S. companies, there is a lack of research studying the impact of various factors on software project success in offshore IT…

  6. Geothermal Energy and its Prospects in Lithuania

    International Nuclear Information System (INIS)

    Radeckas, B.

    1995-01-01

    Data on the geothermal resources in lithuania and on their prospective usage are presented. The analysis covers water horizons of the geothermal anomaly in West Lithuania and their hydrogeology. The energy of the 3 km thick geothermal source was evaluated. Technical and economical possibilities of using geothermal energy in West Lithuania are described. Some aspects of the investment and of the project of a geothermal power plant in Klaipeda are considered. (author). 6 refs., 6 tabs., 2 figs

  7. Clifford’s Fireplace Company Limited Brand Identity Project

    OpenAIRE

    Dee, Peter

    2009-01-01

    Peter Dee - Strategic Design and Marketing Consultant, was responsible for the design and development of the brand identity for the Clifford’s Fireplaces Company which was used on business cards, letterhead, advertisements, promotional material and e-Commerce website. Clifford's Fireplaces Ltd. was established in 1947 and with over 65 years of experience in the fireplace and home heating business it is their goal to ensure that customers obtain the most appropriate products and services to me...

  8. Environmental monitoring for the hot dry rock geothermal energy development project. Annual report, July 1975--June 1976

    Energy Technology Data Exchange (ETDEWEB)

    Pettitt, R.A. (comp.)

    1976-09-01

    The objectives of this environmental monitoring report are to provide a brief conceptual and historical summary of the Hot Dry Rock Geothermal Project, a brief overview of the environmental monitoring responsibilities and activities of the Los Alamos Scientific Laboratory, and descriptions of the studies, problems, and results obtained from the various monitoring programs. Included are descriptions of the work that has been done in three major monitoring areas: (1) water quality, both surface and subsurface; (2) seismicity, with a discussion of the monitoring strategy of regional, local, and close-in detection networks; and (3) climatology. The purpose of these programs is to record baseline data, define potential effects from the project activities, and determine and record any impacts that may occur.

  9. Energy performance strategies for the large scale introduction of geothermal energy in residential and industrial buildings: The GEO.POWER project

    International Nuclear Information System (INIS)

    Giambastiani, B.M.S.; Tinti, F.; Mendrinos, D.; Mastrocicco, M.

    2014-01-01

    Use of shallow geothermal energy, in terms of ground coupled heat pumps (GCHP) for heating and cooling purposes, is an environmentally-friendly and cost-effective alternative with potential to replace fossil fuels and help mitigate global warming. Focusing on the recent results of the GEO.POWER project, this paper aims at examining the energy performance strategies and the future regional and national financial instruments for large scale introduction of geothermal energy and GCHP systems in both residential and industrial buildings. After a transferability assessment to evaluate the reproducibility of some outstanding examples of systems currently existing in Europe for the utilisation of shallow geothermal energy, a set of regulatory, economic and technical actions is proposed to encourage the GCHP market development and support geothermal energy investments in the frame of the existing European normative platforms. This analysis shows that many European markets are changing from a new GCHP market to growth market. However some interventions are still required, such as incentives, regulatory framework, certification schemes and training activities in order to accelerate the market uptake and achieve the main European energy and climate targets. - Highlights: • Potentiality of geothermal applications for heating and cooling in buildings. • Description of the GEO.POWER project and its results. • Local strategies for the large scale introduction of GCHPs

  10. Synopsis of Past Stimulation Methods in Enhanced (Engineered) Geothermal Systems, Boreholes, and Existing Hydrothermal Systems with Success Analysis and Recommendations for Future Projects

    Science.gov (United States)

    Broadhurst, T.; Mattson, E.

    2017-12-01

    Enhanced geothermal systems (EGS) are gaining in popularity as a technology that can be used to increase areas for geothermal resource procurement. One of the most important factors in the success of an EGS system is the success of the subsurface reservoir that is used for fluid flow and heat mining through advection. There are numerous challenges in stimulating a successful reservoir, including maintaining flow rates, minimizing leak off, preventing short-circuiting, and reducing the risk of microseismicity associated with subsurface activity. Understanding past examples of stimulation can be invaluable in addressing these challenges. This study provides an overview of stimulation methods that have been employed in EGS systems from 1974-2017. We include all geothermal reservoirs and demonstration projects that have experienced hydrofracturing, chemical stimulation, and induced thermal stress for a comprehensive list. We also examine different metrics and measures of success in geothermal reservoir stimulation to draw conclusions and provide recommendations for future projects. Multiple project characteristics are reported including geologic setting, stress conditions, reservoir temperature, injection specifics, resulting microseismicity, and overall project goals. Insight into optimal and unproductive stimulation methods is crucial to conserving mental capital, utilizing project funding, and ensuring EGS technology advances as efficiently as possible.

  11. The NICT projects: The company's source of performance ...

    African Journals Online (AJOL)

    To highlight aspects bound to the organization and to the management based on a strategy to be adopted to face any NITC project, while identifying and measuring the advantages and cost of such projects. To develop the culture and the rules of management of organizations according to the new necessities engendered ...

  12. Geothermal energy. Program summary

    Energy Technology Data Exchange (ETDEWEB)

    1979-06-01

    Brief descriptions of geothermal projects funded through the Department of Energy during FY 1978 are presented. Each summary gives the project title, contractor name, contract number, funding level, dates, location, and name of the principal investigator, together with project highlights, which provide informaion such as objectives, strategies, and a brief project description. (MHR)

  13. Geothermal Direct Heat Applications Program Summary

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-09-25

    Because of the undefined risk in the development and use of geothermal energy as a thermal energy source, the Department of Energy Division of Geothermal Energy solicited competitive proposals for field experiments in the direct use of geothermal energy. Twenty-two proposals were selected for cost-shared funding with one additional project co-funded by the State of New Mexico. As expected, the critical parameter was developing a viable resource. So far, of the twenty resources drilled, fourteen have proved to be useful resources. These are: Boise, Idaho; Elko heating Company in Nevada; Pagosa Springs, Colorado; Philip School, Philip, South Dakota; St. Mary's Hospital, Pierre, South Dakota; Utah Roses near Salt Lake City; Utah State Prison, Utah; Warm Springs State Hospital, Montana; T-H-S Hospital, Marlin, Texas; Aquafarms International in the Cochella Valley, California; Klamath County YMCA and Klamath Falls in Oregon; Susanville, California and Monroe, utah. Monroe's 164 F and 600 gpm peak flow was inadequate for the planned project, but is expected to be used in a private development. Three wells encountered a resource insufficient for an economical project. These were Madison County at Rexburg, Idaho; Ore-Ida Foods at Ontario, Oregon and Holly Sugar at Brawley, California. Three projects have yet to confirm their resource. The Navarro College well in Corsicana, Texas is being tested; the Reno, Moana, Nevada well is being drilled and the El Centro, California well is scheduled to be drilled in January 1982. The agribusiness project at Kelly Hot Springs was terminated because a significant archeological find was encountered at the proposed site. The Diamond Ring Ranch in South Dakota, and the additional project, Carrie Tingley Hospital in Truth or Consequences, New Mexico both used existing wells. The projects that encountered viable resources have proceeded to design, construct, and in the most advanced projects, to operate geothermal systems for

  14. Life Cycle Water Consumption and Water Resource Assessment for Utility-Scale Geothermal Systems: An In-Depth Analysis of Historical and Forthcoming EGS Projects

    Energy Technology Data Exchange (ETDEWEB)

    Clark, Corrie E. [Argonne National Lab. (ANL), Argonne, IL (United States); Harto, Christopher B. [Argonne National Lab. (ANL), Argonne, IL (United States); Schroeder, Jenna N. [Argonne National Lab. (ANL), Argonne, IL (United States); Martino, Louis E. [Argonne National Lab. (ANL), Argonne, IL (United States); Horner, Robert M. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2013-08-01

    This report is the third in a series of reports sponsored by the U.S. Department of Energy Geothermal Technologies Program in which a range of water-related issues surrounding geothermal power production are evaluated. The first report made an initial attempt at quantifying the life cycle fresh water requirements of geothermal power-generating systems and explored operational and environmental concerns related to the geochemical composition of geothermal fluids. The initial analysis of life cycle fresh water consumption of geothermal power-generating systems identified that operational water requirements consumed the vast majority of water across the life cycle. However, it relied upon limited operational water consumption data and did not account for belowground operational losses for enhanced geothermal systems (EGSs). A second report presented an initial assessment of fresh water demand for future growth in utility-scale geothermal power generation. The current analysis builds upon this work to improve life cycle fresh water consumption estimates and incorporates regional water availability into the resource assessment to improve the identification of areas where future growth in geothermal electricity generation may encounter water challenges. This report is divided into nine chapters. Chapter 1 gives the background of the project and its purpose, which is to assess the water consumption of geothermal technologies and identify areas where water availability may present a challenge to utility-scale geothermal development. Water consumption refers to the water that is withdrawn from a resource such as a river, lake, or nongeothermal aquifer that is not returned to that resource. The geothermal electricity generation technologies evaluated in this study include conventional hydrothermal flash and binary systems, as well as EGSs that rely on engineering a productive reservoir where heat exists, but where water availability or permeability may be limited. Chapter 2

  15. Geothermal Energy Development annual report 1979

    Energy Technology Data Exchange (ETDEWEB)

    1980-08-01

    This report is an exerpt from Earth Sciences Division Annual Report 1979 (LBL-10686). Progress in thirty-four research projects is reported including the following area: geothermal exploration technology, geothermal energy conversion technology, reservoir engineering, and geothermal environmental research. Separate entries were prepared for each project. (MHR)

  16. Navy Geothermal Plan

    Energy Technology Data Exchange (ETDEWEB)

    1984-12-01

    Domestic geothermal resources with the potential for decreasing fossil fuel use and energy cost exist at a significant number of Navy facilities. The Geothermal Plan is part of the Navy Energy R and D Program that will evaluate Navy sites and provide a technical, economic, and environmental base for subsequent resource use. One purpose of the program will be to provide for the transition of R and D funded exploratory efforts into the resource development phase. Individual Navy geothermal site projects are described as well as the organizational structure and Navy decision network. 2 figs.

  17. The Company Approach to Software Engineering Project Courses

    Science.gov (United States)

    Broman, D.; Sandahl, K.; Abu Baker, M.

    2012-01-01

    Teaching larger software engineering project courses at the end of a computing curriculum is a way for students to learn some aspects of real-world jobs in industry. Such courses, often referred to as capstone courses, are effective for learning how to apply the skills they have acquired in, for example, design, test, and configuration management.…

  18. Geothermal industry assessment

    Energy Technology Data Exchange (ETDEWEB)

    1980-07-01

    An assessment of the geothermal industry is presented, focusing on industry structure, corporate activities and strategies, and detailed analysis of the technological, economic, financial, and institutional issues important to government policy formulation. The study is based principally on confidential interviews with executives of 75 companies active in the field. (MHR)

  19. 76 FR 28024 - Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference

    Science.gov (United States)

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 503-048-ID] Swan Falls Hydroelectric Project, Idaho Power Company; Notice of Teleconference a. Date and Time of Meeting: Tuesday, May 24, 2011 at 10 a.m. (Mountain Time). b. Place: By copy of this notice we are inviting all interested parties to attend a teleconference from...

  20. Daemen Alternative Energy/Geothermal Technologies Demonstration Program, Erie County

    Energy Technology Data Exchange (ETDEWEB)

    Beiswanger, Robert C. [Daemen College, Amherst, NY (United States)

    2013-02-28

    The purpose of the Daemen Alternative Energy/Geothermal Technologies Demonstration Project is to demonstrate the use of geothermal technology as model for energy and environmental efficiency in heating and cooling older, highly inefficient buildings. The former Marian Library building at Daemen College is a 19,000 square foot building located in the center of campus. Through this project, the building was equipped with geothermal technology and results were disseminated. Gold LEED certification for the building was awarded. 1) How the research adds to the understanding of the area investigated. This project is primarily a demonstration project. Information about the installation is available to other companies, organizations, and higher education institutions that may be interested in using geothermal energy for heating and cooling older buildings. 2) The technical effectiveness and economic feasibility of the methods or techniques investigated or demonstrated. According to the modeling and estimates through Stantec, the energy-efficiency cost savings is estimated at 20%, or $24,000 per year. Over 20 years this represents $480,000 in unrestricted revenue available for College operations. See attached technical assistance report. 3) How the project is otherwise of benefit to the public. The Daemen College Geothermal Technologies Ground Source Heat Pumps project sets a standard for retrofitting older, highly inefficient, energy wasting and environmentally irresponsible buildings that are quite typical of many of the buildings on the campuses of regional colleges and universities. As a model, the project serves as an energy-efficient system with significant environmental advantages. Information about the energy-efficiency measures is available to other colleges and universities, organizations and companies, students, and other interested parties. The installation and renovation provided employment for 120 individuals during the award period. Through the new Center

  1. Clean coal technology project to Polk Power Station, Tampa Electric Company, Florida, Volume 1: Report

    International Nuclear Information System (INIS)

    1994-06-01

    Tampa Electric Company proposes to construct and operate a 1,150-MW power station in southwestern Polk County, Florida. The proposed Polk Power Station would require an EPA NPDES permit for a new source and would include a 260-MW IGCC unit as a DOE Clean Coal Technology demonstration project. This EIS document assesses the proposed project and alternatives with respect to environmental impacts. Mitigative measures are also evaluated for the preferred alternative. Included in this Volume I are the following: alternatives including Tampa Electric Companies proposed project (preferred alternative with DOE financial assistance); affected environment; environmental consequences of the alternatives

  2. Bug tracking and project management system application in an electronic design company

    Directory of Open Access Journals (Sweden)

    Sadık ARSLAN

    2016-05-01

    Full Text Available In this study, commercially available Bug Tracking and Management Information Systems has been investigated in a comprehensive manner. The systems that commonly used described in detail. Bug Tracking and Project Management Systems requirements analysis of medium-sized companies and Kentkart Ege Electronic which is an Information Technology company has been made. Obtained by the analysis requirements, the appropriate tools are selected for system application. JIRA that a product of Atlassian company was determined as a Bug Tracking and Project Management application tool. In this study, JIRA system adapted to the requirements, Bug Tracking and Project Management systems is designed in a structure which can be easily used by R&D employees. Cost-Benefit analysis is done and using this project was determined to be quite useful.

  3. Final environmental impact report. Part I. Pacific Gas and Electric Company Geysers Unit 16, Geothermal Power Plant, Lake County, California

    Energy Technology Data Exchange (ETDEWEB)

    1981-03-01

    The environmental analysis includes the following: geology, soils, hydrology, water quality, vegetation, wildlife, air resources, health and safety, noise, waste management, cultural resources, land use, aesthetics, socioeconomics, public services, transportation, and energy and material resources. Also included are: the project description, a summary of environmental consequences, and alternatives to the proposed action. (MHR)

  4. A complementary geothermal application

    International Nuclear Information System (INIS)

    Bedard, R.

    1998-01-01

    A geothermal project for air conditioning and heating at four health centres in Quebec was presented. The four health centres are: le centre Dominique-Tremblay, le centre Cardinal-Villeneuve, le centre Louis-Hebert, et le centre Francois-Charon. The investment made to install the geothermal heating and cooling system, the cost of operating the system, and energy savings resulting from the investment were discussed

  5. Geothermal energy

    International Nuclear Information System (INIS)

    Anon.

    1992-01-01

    This chapter discusses the role of geothermal energy may have on the energy future of the US. The topics discussed in the chapter include historical aspects of geothermal energy, the geothermal resource, hydrothermal fluids, electricity production, district heating, process heating, geopressured brines, technology and costs, hot dry rock, magma, and environmental and siting issues

  6. Key factors of project success in family small and medium-sized companies: the theoretical review

    Directory of Open Access Journals (Sweden)

    Sinisa Arsic

    2017-10-01

    Full Text Available The paper proposes a systematization of the key success factors of projects, through the theoretical review of family-owned companies operating in the EU market. It is the small and medium companies that in their own way contribute to the overall success of the national economy in terms of economic activity, increased employment, development activities and defining better business environment. The theoretical review observed numerous studies of family businesses, and the contribution of this work is in the systematization of the results of previous research – over three horizons, i.e., over the role of managers in the creation of successful projects (or owner if it is a family enterprise, institutional support for companies in Serbia and the EU, specific industries and the parent (regional markets where a family company operates. Project management, as a general representation of the concept of implementation of strategic and operational endeavors, contains many specifics in terms of critical success factors of projects depending on the environment in which they are implemented. The goal of the paper is reflected in the identification and presentation of critical success factors of projects implemented in family companies. The paper concludes with a discussion of the research results in relation to the existing, similar research studies, as well as with the announcement of future research, which will examine the conclusions drawn on a real sample.

  7. Telephone Flat Geothermal Development Project Environmental Impact Statement Environmental Impact Report. Final

    Energy Technology Data Exchange (ETDEWEB)

    None

    1999-02-01

    This Final Environmental Impact Statement and Environmental Impact Report (Final EIS/EIR) has been prepared to meet the requirements of the National Environmental Policy Act (NEPA) and the California Environmental Quality Act (CEQA). The Proposed Action includes the construction, operation, and decommissioning of a 48 megawatt (gross) geothermal power plant with ancillary facilities (10-12 production well pads and 3-5 injection well pads, production and injection pipelines), access roads, and a 230-kilovolt (kV) transmission line in the Modoc National Forest in Siskiyou County, California. Alternative locations for the power plant site within a reasonable distance of the middle of the wellfield were determined to be technically feasible. Three power plant site alternatives are evaluated in the Final EIS/EIR.

  8. Geothermal Injection Monitoring Project. Phase I status report, April 1981-April 1982

    Energy Technology Data Exchange (ETDEWEB)

    Younker, L.; Hanson, J.; Didwall, E.; Kasameyer, P.; Smith, A.; Hearst, J.; Daily, W.; Crow, N.; Younker, J.; Murray, W.

    1982-08-13

    The feasibility of using remote geophysical techniques to monitor the movement of injected brine has been evaluated. It was established that no single approach is likely to be identified that can be used to accurately monitor the precise location of the injected fluid. Several approaches have been considered in parallel because they add new dimensions to the existing monitoring capabilities, and are likely to cover a range of applications at a variety of geothermal sites. These include: microseismicity - a seismic net is used to record small magnitude events associated with injection; streaming potential - self potential anomalies produced by a moving fluid identify fluid flow direction; cross borehole geotomography - two-dimensional image of flow pathways is constructed using electromagnetic waves; and well pressure response to solid earth tide - changes in pore pressures are used to discriminate fracture/pore porosity and estimate fracture orientations.

  9. DIFFICULTIES ENCOUNTERED IN ISO 9001:2008 IMPLEMENTATION PROJECTS IN INCUBATED TECHNOLOGY-BASED COMPANIES

    Directory of Open Access Journals (Sweden)

    Eduardo Gome Salgado

    2014-09-01

    Full Text Available Quality Management Systems (QMS are designed to continuously improve the performance of organizations aiming to constantly improve their services seeking to overcome their results. Thus, for the services and/or products offered to transmit confidence and credibility, they should be designed within appropriate norms and standards. This research aims to assess the difficulties encountered by the incubated companies participating in the PRIME-FINEP project and developing projects for certification of their QMS in accordance with ISO 9001:2008. An exploratory survey was performed in nine incubated technology-based companies (TBC, through a questionnaire with 21 questions totaling the opinion of 20 respondents. After analyzing the data it is concluded, with statistical meaning, that the TBC's with little incubation time present difficulties in implementing the quality policy (5.3, difficulty not identified in other studies conducted in large companies. However difficulties similar to those of the large companies are present in the incubated TBC, and are the following: documentation requirements (4.2 present in all incubated companies (regardless of incubation time, and design and development (7.3 present in companies with little incubation time. The difficulty in implementing the quality policy (5.3 is reflected in the achievement of the QMS certification project in accordance with ISO 9001:2008.

  10. Direct use of geothermal energy, Elko, Nevada district heating. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Lattin, M.W.; Hoppe, R.D.

    1983-06-01

    In early 1978 the US Department of Energy, under its Project Opportunity Notice program, granted financial assistance for a project to demonstrate the direct use application of geothermal energy in Elko, Nevada. The project is to provide geothermal energy to three different types of users: a commercial office building, a commercial laundry and a hotel/casino complex, all located in downtown Elko. The project included assessment of the geothermal resource potential, resource exploration drilling, production well drilling, installation of an energy distribution system, spent fluid disposal facility, and connection of the end users buildings. The project was completed in November 1982 and the three end users were brought online in December 1982. Elko Heat Company has been providing continuous service since this time.

  11. 76 FR 25330 - Georgia Power Company; Project No. 485-063-Georgia and Alabama, Bartletts Ferry Hydroelectric...

    Science.gov (United States)

    2011-05-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Georgia Power Company; Project No. 485-063--Georgia and Alabama, Bartletts Ferry Hydroelectric Project; Notice of Proposed Restricted Service... Ferry Hydroelectric Project. The Programmatic Agreement, when executed by the Commission, the Georgia...

  12. Water Use in Enhanced Geothermal Systems (EGS): Geology of U.S. Stimulation Projects, Water Costs, and Alternative Water Source Policies

    Energy Technology Data Exchange (ETDEWEB)

    Harto, C. B. [Argonne National Lab. (ANL), Argonne, IL (United States); Schroeder, J. N. [Argonne National Lab. (ANL), Argonne, IL (United States); Horner, R. M. [Argonne National Lab. (ANL), Argonne, IL (United States); Patton, T. L. [Argonne National Lab. (ANL), Argonne, IL (United States); Durham, L. A. [Argonne National Lab. (ANL), Argonne, IL (United States); Murphy, D. J. [Argonne National Lab. (ANL), Argonne, IL (United States); Clark, C. E. [Argonne National Lab. (ANL), Argonne, IL (United States)

    2014-10-01

    According to the Energy Information Administration (EIA) of the U.S. Department of Energy (DOE), geothermal energy generation in the United States is projected to more than triple by 2040 (EIA 2013). This addition, which translates to more than 5 GW of generation capacity, is anticipated because of technological advances and an increase in available sources through the continued development of enhanced geothermal systems (EGSs) and low-temperature resources (EIA 2013). Studies have shown that air emissions, water consumption, and land use for geothermal electricity generation have less of an impact than traditional fossil fuel–based electricity generation; however, the long-term sustainability of geothermal power plants can be affected by insufficient replacement of aboveground or belowground operational fluid losses resulting from normal operations (Schroeder et al. 2014). Thus, access to water is therefore critical for increased deployment of EGS technologies and, therefore, growth of the geothermal sector. This paper examines water issues relating to EGS development from a variety of perspectives. It starts by exploring the relationship between EGS site geology, stimulation protocols, and below ground water loss, which is one of the largest drivers of water consumption for EGS projects. It then examines the relative costs of different potential traditional and alternative water sources for EGS. Finally it summarizes specific state policies relevant to the use of alternative water sources for EGS, and finally explores the relationship between EGS site geology, stimulation protocols, and below ground water loss, which is one of the largest drivers of water consumption for EGS projects.

  13. DSM energy saving pilot project report. Company Augstceltne Ltd., Riga, Latvia

    Energy Technology Data Exchange (ETDEWEB)

    Krievins, P.; Cakuls, A.; Kaross, V.; Jansons, D.

    1995-05-01

    This report is a part of the Joint Latvian - Danish Project DEMAND SIDE MANAGEMENT AND ENERGY SAVING. The Project is a part of the Danish aid and technology transfer to Latvia. It is the result of collaborative efforts between a Latvian team, consisting of the specialists from Latvenergo and a Danish team, which was represented by Danish Power Consult. The purpose of this pilot project was not only to carry out energy audit in the company Augstceltne Ltd and propose demand side management and energy saving measures. Another task of the project was the application of DPC energy audit methodic, measuring equipment and software in Latvian conditions and the promotion of energy saving programs in Latvia in this way. The Company Augstceltne Ltd was created to rent the rest of premises for many other independent companys and to earn money for surviving. Now the Company has 9 buildings with a total area of 26,920 square meters. The tower block has 23 floors and it is the main business centre. 66 companies are located in the building. (EG)

  14. Geothermal spas

    International Nuclear Information System (INIS)

    Woodruff, J.L.; Takahashi, P.K.

    1990-01-01

    The spa business, part of the health and fitness industry that has sprung up in recent years, is highly successful world-wide. The most traditional type of spa is the geothermal spa, found in geothermal areas around the world. In Japan, for example, some 2,000 geothermal spas and resorts generate $6 billion annually. Hawaii has an ideal environment for geothermal spas, and several locations in the islands could supply warm mineral water for spa development. Hawaii receives about 6 million visitors annually, a high percentage of whom are familiar with the relaxing and therapeutic value of geothermal spas, virtually guaranteeing the success of this industry in Hawaii. Presently, Hawaii does not have a single geothermal spa. This paper reports that the geothermal spa business is an industry whose time has come, an industry that offers very promising investment opportunities, and one that would improve the economy while expanding the diversity of pleasurable vacation options in Hawaii

  15. Geothermal System Extensions

    Energy Technology Data Exchange (ETDEWEB)

    Gunnerson, Jon [Boise City Corporation, ID (United States); Pardy, James J. [Boise City Corporation, ID (United States)

    2017-09-30

    This material is based upon work supported by the Department of Energy under Award Number DE-EE0000318. The City of Boise operates and maintains the nation’s largest geothermal heating district. Today, 91 buildings are connected, providing space heating to over 5.5 million square feet, domestic water heating, laundry and pool heating, sidewalk snowmelt and other related uses. Approximately 300 million gallons of 177°F geothermal water is pumped annually to buildings and institutions located in downtown Boise. The closed loop system returns all used geothermal water back into the aquifer after heat has been removed via an Injection Well. Water injected back into the aquifer has an average temperature of 115°F. This project expanded the Boise Geothermal Heating District (Geothermal System) to bring geothermal energy to the campus of Boise State University and to the Central Addition Eco-District. In addition, this project also improved the overall system’s reliability and increased the hydraulic capacity.

  16. Project management as a competitive advantage for the internationalization of Brazilian companies

    Directory of Open Access Journals (Sweden)

    Andre Luiz Spinelli Schelini

    2017-12-01

    Full Text Available This study focuses on three theoretical axes: project management (PM, internationalization of companies and the resource-based view (RBV. It aimed to analyze if, and in what way, PM maturity contributes to the international strategy of Brazilian companies from the RBV perspective. The research strategy adopted in three Brazilian companies constituted a multiple case study with a descriptive exploratory approach through intercase and intracase analysis. As an unprecedented result, the study identified five characteristics of mature project management: project sustainability, stakeholder engagement, goal setting and strategy, change management, and risk management. Furthermore, all of these contributed to the internationalization of the companies in question, with an impact on competitive advantage, considering the RBV-VRIO analysis. Thus, the study contributes to the field by aiding companies that are beginning or intend to begin internationalization processes, enabling them to obtain better results through PM. A limitation of the study is the small number of cases investigated, which may be viewed as an opportunity for conducting further studies.

  17. Imperial County geothermal development annual meeting: summary

    Energy Technology Data Exchange (ETDEWEB)

    1983-01-01

    All phases of current geothermal development in Imperial County are discussed and future plans for development are reviewed. Topics covered include: Heber status update, Heber binary project, direct geothermal use for high-fructose corn sweetener production, update on county planning activities, Brawley and Salton Sea facility status, status of Imperial County projects, status of South Brawley Prospect 1983, Niland geothermal energy program, recent and pending changes in federal procedures/organizations, plant indicators of geothermal fluid on East Mesa, state lands activities in Imperial County, environmental interests in Imperial County, offshore exploration, strategic metals in geothermal fluids rebuilding of East Mesa Power Plant, direct use geothermal potential for Calipatria industrial Park, the Audubon Society case, status report of the Cerro Prieto geothermal field, East Brawley Prospect, and precision gravity survey at Heber and Cerro Prieto geothermal fields. (MHR)

  18. China starts tapping rich geothermal resources

    Science.gov (United States)

    Guang, D.

    1980-09-01

    Attention is given to the electric and power installation running on geothermal energy at Yangbajain, Tibet. Other geothermal projects in Tibet, the Yunnan Province and the North China Plain are also outlined. Applications of geothermal energy are described, including the heating of homes and factories, spinning, weaving, paper-making and the making of wine.

  19. Exemplary subsurface geothermal projects in the western part of Germany; Beispiele zur Nutzung oberflaechennaher Geothermie im Westen Deutschlands

    Energy Technology Data Exchange (ETDEWEB)

    Sanner, B.; Mands, E. [UbeG GbR, Wetzlar (Germany); Kohlsch, O. [EWS Erdwaerme-Systemtechnik GmbH, Delbrueck (Germany)

    2004-12-01

    During the past few years, several projects involving ground source heat pumps were carried out in western Germany, especially in the Rhine-Main and Rhine-Ruhr-Sieg region including the cities of Frankfurt and Cologne. Some of the project partners are big names in industry, e.g. an office building of PhilipsSparte APD at Wetzlar and the museum building of chocolate producer Ritter Sport. Other projects are sited in rural regions, from the Black Forest to the Weserbergland hills. The contribution presents several interesting projects, e.g. the police headquarters building at Bonn (right bank, groundwater use) and the office building of the Federal Office of Environmental protection, also at Bonn (left bank, geothermal probles), and three school buildings in the Frankfurt/Main region at Glashuetten, Bad Homburg-Oberstedten and Usingen-Eschbach. (orig.) [German] In den letzten Jahren wurden im Westen Deutschlands eine ganze Reihe groesserer Projekte mit erdgekoppelten Waermepumpen verwirklicht, besonders im Rhein-Main-Gebiet und im Rhein-Ruhr-Sieg-Gebiet einschliesslich der Grossstaedte Frankfurt und Koeln. Zu den Bauherren zaehlen inzwischen auch bekannte Namen der deutschen Industrie. So wird in Wetzlar ein Buerogbaeude der PhilipsSparte APD mit Erdwaermesonden ausgeruestet, und das Museum des Schokoladenherstellers Ritter Sport wird auf Energiepfaehlen stehen. Abe auch im laendlichen Raum sind interessante Anlagen entstanden, vom Schwarzwald bis ins Weserbergland. Im Folgenden werden einige interessante Beispiele vorgestellt. Dabei sind Projekte in der Ausfuehrungsphase wie z.B. das Polizeipraesidium in Bonn (rechts des Rheins mit Grundwassernutzung), oder das Bundesamt fuer Naturschutz in Bonn, diesmal auf der linken Rheinseite und mit Erdwaermesonden. In Ausfuehrungn bzw. fertiggestellt sind auch Erdwaermesonden fuer 3 Schulen im Raum Frankfurt:/Main, in Glashuetten, Bad Homburg-Oberstedten und Usingen-Eschbach. (orig.)

  20. Geothermal engineering fundamentals and applications

    CERN Document Server

    Watson, Arnold

    2013-01-01

    This book explains the engineering required to bring geothermal resources into use. The book covers specifically engineering aspects that are unique to geothermal engineering, such as measurements in wells and their interpretation, transport of near-boiling water through long pipelines, turbines driven by fluids other than steam, and project economics. The explanations are reinforced by drawing comparisons with other energy industries.

  1. The Neustadt-Glewe geothermal project - problems and experience during operation; Das Geothermieprojekt Neustadt-Glewe - Probleme und Erfahrungen mit einer laufenden Anlage

    Energy Technology Data Exchange (ETDEWEB)

    Menzel, H [Erdwaerme Neustadt-Glewe GmbH (Germany)

    1997-12-01

    The scope and goals of the project and the principle of the Neustadt-Glewe geothermal system are presented. The system was commissioned in February 1995, so that sufficient performance data and availability information are now available. Problems that occurred are described and analyzed. Preliminary analyses of the consumption-dependent cost and cost distribution provide a basis for statements on the economic efficiency of geothermal projects. (orig.) [Deutsch] Es werden Inhalt und Ziel des Projektes, sowie das Prinzip der Geothermienutzung in Neustadt-Glewe kurz dargestellt. Nachdem die Anlage im Februar 1995 in Betrieb ging, koennen erste Betriebsergebnisse und Zuverlaessigkeitsaussagen gegeben werden. Es werden Probleme beim Betrieb der Anlagen geschildert und analysiert. Erste Analysen fuer die verbrauchsabhaengigen Kosten und die Kostenverteilung bilden die Grundlage fuer Aussagen zur Wirtschaftlichkeit derartiger Projekte. (orig.)

  2. Using accounting information systems by operations managers in a project company

    NARCIS (Netherlands)

    Wouters, Marc; van der Veeken, Henk J.M.

    2002-01-01

    This paper describes the results of a case study that investigated the use of accounting information by operations managers in a road building company. There was considerable preplanning before the execution of project activities, but task uncertainty during execution created the need to take

  3. Scoping a Product Configuration Project for Engineer-to-Order Companies

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Bonev, Martin

    2014-01-01

    When implementing a product configuration system in a company making complex and highly engineered products, many decisions need to be made in the early phases of the project. This article presents a framework for supporting the initial scoping process and discusses experiences from applying...

  4. Methodology for the evaluation of a 4000-home geothermal heat pump retrofit at Fort Polk, Louisiana

    Energy Technology Data Exchange (ETDEWEB)

    Hughes, P.J.; Shonder, J.A.; White, D.L.; Huang, H.L.

    1998-03-01

    The US Army and a private energy service company are developing a comprehensive energy efficiency project to upgrade the family housing at Fort Polk, Louisiana. The project includes converting the space conditioning systems of more than 4,000 housing units to geothermal (or ground-source) heat pumps (GHPs). This interim report describes the methodology of the evaluation associated with this project, including the field monitoring that has been conducted at the base.

  5. Geothermal energy

    International Nuclear Information System (INIS)

    Laplaige, Ph.; Lemale, J.

    2008-01-01

    Geothermal energy is a renewable energy source which consists in exploiting the heat coming from the Earth. It covers a wide range of techniques and applications which are presented in this article: 1 - the Earth, source of heat: structure of the Earth, geodynamic model and plate tectonics, origin of heat, geothermal gradient and terrestrial heat flux; 2 - geothermal fields and resources; 3 - implementation of geothermal resources: exploration, main characteristic parameters, resource exploitation; 4 - uses of geothermal resources: power generation, thermal uses, space heating and air conditioning heat pumps, district heating, addition of heat pumps; 5 - economical aspects: power generation, heat generation for district heating; 6 - environmental aspects: conditions of implementation, impacts as substitute to fossil fuels; 7 - geothermal energy in France: resources, organisation; 8 - conclusion. (J.S.)

  6. Geothermal energy

    OpenAIRE

    Manzella A.

    2017-01-01

    Geothermal technologies use renewable energy resources to generate electricity and direct use of heat while producing very low levels of greenhouse-gas (GHG) emissions. Geothermal energy is the thermal energy stored in the underground, including any contained fluid, which is available for extraction and conversion into energy products. Electricity generation, which nowadays produces 73.7 TWh (12.7 GW of capacity) worldwide, usually requires geothermal resources temperatures of over 100 °C. Fo...

  7. Geothermal energy

    International Nuclear Information System (INIS)

    Le Du, H.; Bouchot, V.; Lopez, S.; Bialkowski, A.; Colnot, A.; Rigollet, C.; Sanjuan, B.; Millot, R.; Brach, M.; Asmundsson, R.; Giroud, N.

    2010-01-01

    Geothermal energy has shown a revival for several years and should strongly develop in a near future. Its potentiality is virtually unexhaustible. Its uses are multiple and various: individual and collective space heating, heat networks, power generation, heat storage, heat exchanges etc.. Re-launched by the demand of renewable energy sources, geothermal energy has become credible thanks to the scientific works published recently which have demonstrated its economical and technical relevance. Its image to the public is changing as well. However, lot of work remains to do to make geothermal energy a real industry in France. Several brakes have to be removed rapidly which concern the noise pollution of geothermal facilities, the risk of bad results of drillings, the electricity costs etc. This dossier gives an overview of today's main research paths in the domain of geothermal energy: 1 - geothermal energy in France: historical development, surface and deep resources, ambitions of the French national energy plan (pluri-annual investment plan for heat generation, incentives, regional 'climate-air-energy' schemes), specific regulations; 2 - geothermal energy at the city scale - sedimentary basins: Ile-de-France 40 years of Dogger reservoir exploitation, potentialities of clastic reservoirs - the Chaunoy sandstones example; 3 - geothermal power generation: conventional reservoirs - the Bouillante model (Guadeloupe, French Indies); the Soultz-sous-Forets pilot plant (Bas-Rhin, France); the supercritical reservoirs - the Krafla geothermal area (Iceland). (J.S.)

  8. TAX TREATMENT OF CARBON CREDIT OPERATIONS IN BRAZILIAN COMPANIES WITH CDM PROJECTS

    Directory of Open Access Journals (Sweden)

    Vanderlei dos Santos

    2012-06-01

    Full Text Available The aim in this study is to identify the tax treatment applied to carbon credit operations in Brazilian companies that are developing projects in the context of the Clean Development Mechanism (CDM. Therefore, an exploratory research with a qualitative approach was developed. Data were collected with the help of questionnaire, forwarded to all Brazilian companies with CDM projects that received approval from the Inter-Ministerial Commission on Global Climate Change (CIMGC without safeguards, according to the list of the Brazilian Ministry of Science and Technology. Out of 117 companies listed, only five answered the research instrument, which represents an accessibility sample. The results show that, as for the tax treatment applied in the companies under analysis, IRPJ and CSLL should be charged on carbon credit operations. Regarding PIS, COFINS, ISS, some companies considered that these taxes are due and others that they are not. There is a consensus, though, about the fact that ICMS and IOF should not be charged. In conclusion, no uniform understanding exists as of yet about due taxes in the research sample, as no specific fiscal legislation exists yet on carbon credits in Brazil.

  9. Stimuli of Collaboration in Product Development: A Case Study in a Project Manufacturing Company

    Directory of Open Access Journals (Sweden)

    Jääskeläinen Aki

    2017-12-01

    Full Text Available There is already a wide acceptance on the importance of involving supplier and customer companies in product development. Decent understanding prevails on the relationship-oriented approach to product development including various collaboration forms. However, there is less research on the factors explaining the decision of attending to joint product development. In addition, less studies have examined the integrated role of both suppliers and customers in product development initiatives. This study searches answers to the following research questions: 1. What is the role of different actors in product development initiatives? 2. What factors motivate suppliers and customers to participate in product development? The research is carried out as an in-depth qualitative single case study in a large project manufacturing company. It takes the perspective of a focal company striving for product improvements. The first part of the empirical study consists of 15 semi-structured interviews. The second part includes two discursive workshops and builds upon the results of the interviews. This study contributes to the existing research by explaining the challenges and conditions facilitating joint product development with supplier and purchaser companies. The results highlight the role of customers in improving the effectiveness of product development. As a practical contribution, the paper reports the application of workshop method as a facilitator of collaboration between supplier, purchaser (focal company and customer companies.

  10. Profitability Evaluation of a Hybrid Geothermal and CO2 Sequestration Project for a Coastal Hot Saline Aquifer.

    Science.gov (United States)

    Plaksina, Tatyana; Kanfar, Mohammed

    2017-11-01

    With growing interest in commercial projects involving industrial volume CO2 sequestration, a concern about proper containment and control over the gas plume becomes particularly prominent. In this study, we explore the potential of using a typical coastal geopressured hot saline aquifer for two commercial purposes. The first purpose is to harvest geothermal heat of the aquifer for electricity generation and/or direct use and the second one is to utilize the same rock volume for safe and controlled CO2 sequestration without interruption of heat production. To achieve these goals, we devised and economically evaluated a scheme that recovers operational and capital costs within first 4 years and yields positive internal rate of return of about 15% at the end of the operations. Using our strategic design of well placement and operational scheduling, we were able to achieve in our numerical simulation study the following results. First, the hot water production rates allowed to run a 30 MW organic Rankine cycle plant for 20 years. Second, during the last 10 years of operation we managed to inject into the same reservoir (volume of 0.8 x 109 m3) approximately 10 million ton of the supercritical gas. Third, decades of numerical monitoring the plume after the end of the operations showed that this large volume of CO2 is securely sequestrated inside the reservoir without compromising the caprock integrity.

  11. Profitability Evaluation of a Hybrid Geothermal and CO2 Sequestration Project for a Coastal Hot Saline Aquifer.

    Directory of Open Access Journals (Sweden)

    Plaksina Tatyana

    2017-01-01

    Full Text Available With growing interest in commercial projects involving industrial volume CO2 sequestration, a concern about proper containment and control over the gas plume becomes particularly prominent. In this study, we explore the potential of using a typical coastal geopressured hot saline aquifer for two commercial purposes. The first purpose is to harvest geothermal heat of the aquifer for electricity generation and/or direct use and the second one is to utilize the same rock volume for safe and controlled CO2 sequestration without interruption of heat production. To achieve these goals, we devised and economically evaluated a scheme that recovers operational and capital costs within first 4 years and yields positive internal rate of return of about 15% at the end of the operations. Using our strategic design of well placement and operational scheduling, we were able to achieve in our numerical simulation study the following results. First, the hot water production rates allowed to run a 30 MW organic Rankine cycle plant for 20 years. Second, during the last 10 years of operation we managed to inject into the same reservoir (volume of 0.8 x 109 m3 approximately 10 million ton of the supercritical gas. Third, decades of numerical monitoring the plume after the end of the operations showed that this large volume of CO2 is securely sequestrated inside the reservoir without compromising the caprock integrity.

  12. A case study of radial jetting technology for enhancing geothermal energy systems at Klaipeda geothermal demonstration plant

    NARCIS (Netherlands)

    Nair, R.; Peters, E.; Sliaupa, S.; Valickas, R.; Petrauskas, S.

    2017-01-01

    In 1996 a geothermal energy project was initiated at Klaipėda, Lithuania, to demonstrate the feasibility of using low enthalpy geothermal water as a renewable energy resource in district heating systems. The Klaipėda geothermal plant is situated within the West Lithuanian geothermal anomaly with a

  13. Impact of Leadership Styles on Project Success – The Case of a Multinational Company

    Directory of Open Access Journals (Sweden)

    Bálint Blaskovics

    2014-11-01

    Full Text Available Literature on project success mainly focused on identifying and analyzing success criteria and critical success factors. Success criteria are used for evaluating the success of a project and critical success factors are those factors which increase the potential for achieving project success. However, the interrelationships among them were rarely analyzed, although researchers highlighted the importance of these interrelationships. The aim of the paper is to identify a leadership style, of which project managers can maximize the potential for achieving project success. Project success is analyzed from the point of view of success criteria. This approach manages the shortcoming mentioned above, the lack of analyzing interrelationships among critical success factors and success criteria. This outcome is drawn from qualitative field research at a subsidiary of a Scandinavian-based multinational company.

  14. MEASUREMENT PROCESS OF SOFTWARE DEVELOPMENT PROJECTS FOR SUPPORTING STRATEGIC BUSINESS OBJECTIVES IN SOFTWARE DEVELOPING COMPANIES

    Directory of Open Access Journals (Sweden)

    Sandra Lais Pedroso

    2013-08-01

    Full Text Available Software developing companies work in a competitive market and are often challenged to make business decisions with impact on competitiveness. Models accessing maturity for software development processes quality, such as CMMI and MPS-BR, comprise process measurements systems (PMS. However, these models are not necessarily suitable to support business decisions, neither to achieve strategic goals. The objective of this work is to analyze how the PMS of software development projects could support business strategies for software developing companies. Results taken from this work show that PMS results from maturity models for software processes can be suited to help evaluating operating capabilities and supporting strategic business decisions.

  15. How to Scope a Product Configuration Project in an Engineering Company

    DEFF Research Database (Denmark)

    Shafiee, Sara; Hvam, Lars; Bonev, Martin

    2014-01-01

    When implementing a product configuration system in a company making complex and highly engineered products, many decisions need to be made in the early phases of the project. This article presents a framework for supporting the initial scoping process and discusses experiences from applying...... the framework in an engineering company. The framework covers a number of topics, such as identifying the users of the configuration system, prioritizing the user requirements, defining the input and output, and the overall functionality of the configuration system. Furthermore, the scoping process considers...

  16. Geothermal energy

    International Nuclear Information System (INIS)

    Kappelmeyer, O.

    1991-01-01

    Geothermal energy is the natural heat of the earth. It represents an inexhaustible source of energy. In many countries, which are mostly located within the geothermal belts of the world, geothermal energy is being used since many decades for electricity generation and direct heating applications comprising municipal, industrial and agricultural heating. Outside the geothermal anomalous volcanic regions, hot ground water from deep rock formations at temperatures above 70 o C is used for process heat and space heating. Low prices for gas and oil hinder the development of geothermal plants in areas outside positive geothermal anomalies; the cost of drilling to reach depths, where temperatures are above 50 o C to 70 o C, is high. The necessary total investment per MW th installed capacity is in the order of 5 Mio- DM/MW th (3 Mio $/MW th ). Experience shows, that an economic break even with oil is reached at an oil price of 30$ per barrel or if an adequate bonus for the clean, environmentally compatible production of geothermal heat is granted. Worldwide the installed electric capacity of geothermal power plants is approximately 6 000 MW e . About 15 000 MW th of thermal capacity is being extracted for process heat and space heat. The importance of the terrestrial heat as an energy resource would be substantially increased, if the heat, stored in the hot crystalline basement could be extracted at economical production costs. Geothermal energy is a competitive energy source in areas with high geothermal gradients (relative low cost for drilling) and would be competitive in areas with normal geothermal gradients, if a fair compensation for environmental implications from fossil and nuclear power production would be granted. (author) 2 figs., 1 tab., 6 refs

  17. Change of the layout of an office of a metallurgical company: simple projects, big solutions.

    Science.gov (United States)

    Duarte, Luiz Carlos da Silva; Eckhardt, Moacir; da Motta, Giordano Paulo

    2012-01-01

    The posture, a good organization and the proper layout of the environment and workplaces have a positive influence on the income of an employee. To develop the work it is used a methodology that addressed the study phases of the theory involving the subject, description of the current situation, preparation of conceptions, choice of design, implementation and reporting of results. Through the project of "Change of the layout of an office of a metallurgical company" there was an intervention in these reported aspects providing improvements in the office, regarding ergonomic, layout, workplace and lighting issues, bringing welfare to the official, with the intent to improve its performance within the company and facilitating its actions, as the company's customer service. The results provided improvements in layout, in the workplace and especially in comfort for the human resources that perform their activities.

  18. Innovation versus monopoly: geothermal energy in the West. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Bierman, S.L.; Stover, D.F.; Nelson, P.A.; Lamont, W.J.

    1977-07-01

    The following subjects are covered: geothermal energy and its use, electric utilities and the climate for geothermal development, the raw fuels industry and geothermal energy, and government and energy. The role of large petroleum companies and large public utilities is emphasized. (MHR)

  19. Washington: a guide to geothermal energy development

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R.G.; Basescu, N.; Higbee, C.; Justus, D.; Simpson, S.

    1980-06-01

    Washington's geothermal potential is discussed. The following topics are covered: exploration, drilling, utilization, legal and institutional setting, and economic factors of direct use projects. (MHR)

  20. Where in the World are Canadian Oil and Gas Companies? An Introduction to the Project

    Directory of Open Access Journals (Sweden)

    Niloo Hojjati

    2017-06-01

    Full Text Available In April 2013, The School of Public Policy formally launched the Extractive Resource Governance Program, a platform to harness Canadian and international research and technical expertise to assist resource-rich jurisdictions in establishing sustainable and mutually beneficial policies for governance of the extractive sector. The program delivers applied policy research, technical assistance and executive training programs to countries with emerging or established extractive resources, working in collaboration with governments, regulatory bodies, academia, civil society, and industry. Begun in 2011 as an internal research tool for the development of the Extractive Resource Governance Program, this project was conceived as a means to identify jurisdictions where Canadian companies had ongoing projects and activities around the world. This paper introduces the methodology used to answer the question: Where in the world are Canadian oil and gas companies? To answer this question, firm-level data from publicly traded Canadian companies were collected and analyzed culminating in the development of an online tool for public use. This paper accompanies an interactive website launched by The School’s Extractive Resource Governance Program and describes the data available online as well as in the annual reports released by The school. The website and annual reports allow interested users to geographically locate jurisdictions around the world where publicly traded Canadian oil and gas companies have activities, over time. The website is available at http://www.policyschool.ca/research-teaching/teachingtraining/extractive-resource-governance/ergp-map/. While Canada is a well-recognized oil and gas jurisdiction within its own borders, the extent of activity that Canadian companies undertake in the international arena is less well known. For instance, while Natural Resources Canada collects and publishes regular data on Canadian mining assets and

  1. Geothermal Technologies Program: Direct Use

    Energy Technology Data Exchange (ETDEWEB)

    2004-08-01

    This general publication describes geothermal direct use systems, and how they have been effectively used throughout the country. It also describes the DOE program R&D efforts in this area, and summarizes several projects using direct use technology.

  2. Issues related to geothermal development

    International Nuclear Information System (INIS)

    Lesperance, G.O.

    1990-01-01

    This paper reports on a number of potential barriers to geothermal development in Hawaii which have been overcome but some remain. Efforts continue to address issues relating to transmission, project economics, the regulatory process, resource verification, and public acceptance

  3. Phase I Archaeological Investigation Cultural Resources Survey, Hawaii Geothermal Project, Makawao and Hana Districts, South Shore of Maui, Hawaii (DRAFT )

    Energy Technology Data Exchange (ETDEWEB)

    Erkelens, Conrad

    1994-03-01

    . Charcoal, molluscan and fish remains, basalt tools, and other artifacts were recovered. This material, while providing an extremely small sample, will greatly enhance our understanding of the use of the area. Recommendations regarding the need for further investigation and the preservation of sites within the project corridor are suggested. All sites within the project corridor must be considered potentially significant at this juncture. Further archaeological investigation consisting of a full inventory survey will be required prior to a final assessment of significance for each site and the development of a mitigation plan for sites likely to be impacted by the Hawaii Geothermal Project.

  4. The Campi Flegrei Deep Drilling Project: using borehole measurements to discriminate magmatic and geothermal effects in caldera unrest

    Science.gov (United States)

    De Natale, Giuseppe; Troise, Claudia; Carlino, Stefano; Troiano, Antonio; Giulia Di Giuseppe, Maria; Piochi, Monica; Somma, Renato; Tramelli, Anna; Kilburn, Christopher

    2015-04-01

    Large calderas are potentially the most risky volcanic areas in the world since they are capable of producing huge eruptions whose major effects can involve human life and activities from regional to global scale. Calderas worldwide are characterized by frequent episodes of unrest which, only in few cases, culminate with eruptions. This ambiguous behavior is generally explained in terms of magma intrusion or disturbance of geothermal fluids in the shallow crust, which are both source of ground deformations and seismicity. A major goal is to determine the relative contribution of each process, because the potential for eruptions significantly enhanced if magma movements emerge as the primary component. A very important case study is the active Campi Flegrei caldera, hosting part of the large city of Naples (Southern Italy). In the framework of the Campi Flegrei Deep Drilling Project new filed data from pilot borehole have been recorded (permeability and in situ stress) by using a novel procedure of Leak Off Test. These new data, particularly the actual permeability, are fundamental to calibrate the caldera unrest models at Campi Flegrei and, , to put constrains to forecast the maximum future eruptive scenario. We show here that these new data, integrated by fluid-dynamical modeling, allow to assess that only about a third of the maximum uplift recorded in 1982-1984 may be due to shallow aquifer perturbation, so that the remaining part should be due to magma inflow, corresponding to about 0.05 Km3 of new magma if we assume a sill-like reservoir located at 4 km of depth. Considering an almost equivalent magma inflow for the 1969-1972 unrest, which showed a similar uplift, we got a total magma inflow of 0.1 Km3. It is then very important to assess the times for cooling of such accumulated magma, in order to assess the eruption hazard.

  5. Geothermal energy

    International Nuclear Information System (INIS)

    Lemale, J.

    2009-01-01

    The geothermal energy, listed among the new and renewable energy sources, is characterized by a huge variety of techniques and applications. This book deals with the access to underground geothermal resources and with their energy valorization as well. After a presentation of the main geological, hydrogeological and thermal exploitation aspects of this resource, the book presents the different geothermal-related industries in detail, in particular the district heating systems, the aquifer-based heat pumps, the utilizations in the agriculture, fishery and balneology sectors, and the power generation. (J.S.)

  6. Development of geothermal resources

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-09-01

    This paper describes the geothermal development promotion survey project. NEDO is taking the lead in investigation and development to reduce risks for private business entities and promote their development. The program is being moved forward by dividing the surveys into three ranks of A, B and C from prospects of geothermal resource availability and the state of data accumulation. The survey A lacks number of data, but covers areas as wide as 100 to 300 km{sup 2}, and studies possible existence of high-temperature geothermal energy. The survey B covers areas of 50 to 70 km{sup 2}, investigates availability of geothermal resources, and assesses environmental impacts. The survey C covers areas of 5 to 10 km{sup 2}, and includes production well drilling and long-term discharge tests, other than those carried out by the surveys A and B. Results derived in each fiscal year are evaluated and judged to establish development plans for the subsequent fiscal year. This paper summarizes development results on 38 areas from among 45 areas surveyed since fiscal 1980. Development promotion surveys were carried out over seven areas in fiscal 1994. Development is in progress not only on utilization of high-temperature steam, but also on binary cycle geothermal power generation utilizing hot waters of 80 to 150{degree}C. Fiscal 1994 has carried out discussions for spread and practical use of the systems (particularly on economic effects), and development of small-to-medium scale binary systems. 2 figs., 1 tab.

  7. Geothermal Heat Pump System for New Student Housing Project at the University at Albany Main Campus

    Energy Technology Data Exchange (ETDEWEB)

    Lnu, Indumathi [Univ. of Albany, NY (United States)

    2015-08-27

    University at Albany successfully designed, constructed and is operating a new student housing building that utilizes ground source heat pump (GSHP) for heating and cooling the entire 191,500SF building. The installed system consists of a well field with 150 bores, 450 feet deep and (189) terminal heat pump units for a total capacity of 358 Tons cooling and 4,300 MBtu/h heating. The building opened in Fall 2012. The annual energy use and cost intensity of the building, after the changes made during the first 2 years’ of operation is 57kBtu/SF/Year and $1.30/SF/Year respectively. This is approximately 50% lower than the other residential quads on campus, despite the fact that the quads are not air-conditioned. The total project cost from design through 3-years of operations is approximately $6 Million, out of which $5.7 Million is for construction of the GSHP system including the well field. The University received a $2.78 Million grant from the Department of Energy. The estimated utility cost savings, compared to a baseline building with conventional HVAC system, is approximately $185,000. The estimated simple payback, after grant incentives, is 15 years. Additionally, the project has created 8.5FTE equivalent jobs.

  8. Geothermal energy technology

    Energy Technology Data Exchange (ETDEWEB)

    1977-01-01

    Geothermal energy research and development by the Sunshine Project is subdivided into five major categories: exploration and exploitation technology, hot-water power generation technology, volcanic power generation technology, environmental conservation and multi-use technology, and equipment materials research. The programs are being carried out by various National Research Institutes, universities, and private industry. During 1976 and 1977, studies were made of the extent of resources, reservoir structure, ground water movement, and neotectonics at the Onikobe and Hachimantai geothermal fields. Studies to be performed in the near future include the use of new prospecting methods, including artificial magnetotellurics, heat balance calculation, brightspot techniques, and remote sensing, as well as laboratory studies of the physical, mechanical, and chemical properties of rock. Studies are continuing in the areas of ore formation in geothermal environments, hot-dry-rock drilling and fracturing, large scale prospecting technology, high temperature-pressure drilling muds and well cements, and arsenic removal techniques.

  9. Prognostic simulation of reinjection-research project geothermal site Neustadt-Glewe/Germany

    Energy Technology Data Exchange (ETDEWEB)

    Poppei, J. [Geothermie Neubrandenburg GmbH (Germany)

    1995-03-01

    For the first time after political and economical changes in Germany a hydrothermal site was put into operation in December 1994. Due to prevailing conditions extraordinary in Central Europe (reservoir temperature 99{degrees}C; 220 g/l salinity) the project Neustadt-Glewe is supported by a comprehensive research program. The wells concerned (a doublet with an internal distance of 1.400 m) open the porous sandstone aquifer with an average thickness of about 53 m in a depth of 2.240m. One point of interest was the pressure and temperature behavior over a period of 10 years considering the fluid viscosity changes due to variable injection temperature. For means of reservoir simulation and prognosing the injection behavior and simulator code TOUGH2 was used.

  10. "Assistance to States on Geothermal Energy"

    Energy Technology Data Exchange (ETDEWEB)

    Linda Sikkema; Jennifer DeCesaro

    2006-07-10

    This final report summarizes work carried out under agreement with the U.S. Department of Energy, related to geothermal energy policy issues. This project has involved a combination of outreach and publications on geothermal energy—Contract Number DE-FG03-01SF22367—with a specific focus on educating state-level policymakers. Education of state policymakers is vitally important because state policy (in the form of incentives or regulation) is a crucial part of the success of geothermal energy. State policymakers wield a significant influence over all of these policies. They are also in need of high quality, non-biased educational resources which this project provided. This project provided outreach to legislatures, in the form of responses to information requests on geothermal energy and publications. The publications addressed: geothermal leasing, geothermal policy, constitutional and statutory authority for the development of geothermal district energy systems, and state regulation of geothermal district energy systems. These publications were distributed to legislative energy committee members, and chairs, legislative staff, legislative libraries, and other related state officials. The effect of this effort has been to provide an extensive resource of information about geothermal energy for state policymakers in a form that is useful to them. This non-partisan information has been used as state policymakers attempt to develop their own policy proposals related to geothermal energy in the states. Coordination with the National Geothermal Collaborative: NCSL worked and coordinated with the National Geothermal Collaborative (NGC) to ensure that state legislatures were represented in all aspects of the NGC's efforts. NCSL participated in NGC steering committee conference calls, attended and participated in NGC business meetings and reviewed publications for the NGC. Additionally, NCSL and WSUEP staff drafted a series of eight issue briefs published by the

  11. A survey of endangered waterbirds on Maui and Oahu and assessment of potential impacts to waterbirds from the proposed Hawaii Geothermal Project transmission corridor. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Evans, K.; Woodside, D.; Bruegmann, M. [Fish and Wildlife Service, Honolulu, HI (United States). Pacific Islands Office

    1994-08-01

    A survey of endangered waterbirds on Maui and Oahu was conducted during August and September 1993 to identify potential waterbird habitats within the general area of the proposed Hawaii Geothermal Project transmission corridor and to assess the potential impacts to endangered waterbird of installing and operating a high voltage transmission line from the Island of Hawaii to the islands of Oahu and Maui. Annual waterbird survey information and other literature containing information on specific wetland sites were summarized. Literature describing impacts of overhead transmission lines on birds was used to evaluate potential impacts of the proposed project on endangered waterbirds, resident wading birds, and migratory shorebirds and waterfowl. On Oahu, five wetland habitats supporting endangered Hawaiian waterbirds were identified within 2.5 miles of the proposed transmission line corridor. On Maui, three wetland habitats supporting endangered Hawaiian waterbirds were identified within the general area of the proposed transmission line corridor. Several of the wetlands identified on Oahu and Maui also supported resident wading birds and migratory shorebirds and waterfowl. Endangered waterbirds, resident wading birds, and migratory birds may collide with the proposed transmission lines wires. The frequency and numbers of bird collisions is expected to be greater on Oahu than on Maui because more wetland habitat exists and greater numbers of birds occur in the project area on Oahu. In addition, the endangered Hawaiian goose and the endangered Hawaiian petrel may be impacted by the proposed segment of the Hawaii Geothermal Project transmission line on Maui.

  12. New possibilities and perspectives of building hotwater line from geothermal wells heat exchanger to TEKO Košice

    Directory of Open Access Journals (Sweden)

    Marína Sidorová

    2006-04-01

    Full Text Available Thank to favourable geological conditions, Slovakia is a country abundant in the occurrence of low-enthalpy sources. The government of the state sponsors new renewable of the sources ecological energy,including the geothermal energy. Geothermal water is utilized for recreation (swimming pools, spas, agriculture (heating of greenhouses, fishing and heating of houses. The effectivity of utilisation is about 30 % due to its seasonal use. That is why the annual house-heating and the hot water supply from geothermal sources are supported. Recently, the company Slovgeoterm has initiated heating of greenhouses in Podhajska and hospital and 1231 flats in the town Galanta. Nowadays, a research for the biggest geothermal project in the Middle Europe – construction in Košice basin has started.

  13. Geothermal energy

    Directory of Open Access Journals (Sweden)

    Manzella A.

    2017-01-01

    Full Text Available Geothermal technologies use renewable energy resources to generate electricity and direct use of heat while producing very low levels of greenhouse-gas (GHG emissions. Geothermal energy is the thermal energy stored in the underground, including any contained fluid, which is available for extraction and conversion into energy products. Electricity generation, which nowadays produces 73.7 TWh (12.7 GW of capacity worldwide, usually requires geothermal resources temperatures of over 100 °C. For heating, geothermal resources spanning a wider range of temperatures can be used in applications such as space and district heating (and cooling, with proper technology, spa and swimming pool heating, greenhouse and soil heating, aquaculture pond heating, industrial process heating and snow melting. Produced geothermal heat in the world accounts to 164.6 TWh, with a capacity of 70.9 GW. Geothermal technology, which has focused for decades on extracting naturally heated steam or hot water from natural hydrothermal reservoirs, is developing to more advanced techniques to exploit the heat also where underground fluids are scarce and to use the Earth as a potential energy battery, by storing heat. The success of the research will enable energy recovery and utilization from a much larger fraction of the accessible thermal energy in the Earth’s crust.

  14. Geothermal energy

    Science.gov (United States)

    Manzella, A.

    2017-07-01

    Geothermal technologies use renewable energy resources to generate electricity and direct use of heat while producing very low levels of greenhouse-gas (GHG) emissions. Geothermal energy is the thermal energy stored in the underground, including any contained fluid, which is available for extraction and conversion into energy products. Electricity generation, which nowadays produces 73.7 TWh (12.7 GW of capacity) worldwide, usually requires geothermal resources temperatures of over 100 °C. For heating, geothermal resources spanning a wider range of temperatures can be used in applications such as space and district heating (and cooling, with proper technology), spa and swimming pool heating, greenhouse and soil heating, aquaculture pond heating, industrial process heating and snow melting. Produced geothermal heat in the world accounts to 164.6 TWh, with a capacity of 70.9 GW. Geothermal technology, which has focused for decades on extracting naturally heated steam or hot water from natural hydrothermal reservoirs, is developing to more advanced techniques to exploit the heat also where underground fluids are scarce and to use the Earth as a potential energy battery, by storing heat. The success of the research will enable energy recovery and utilization from a much larger fraction of the accessible thermal energy in the Earth's crust.

  15. Geothermal studies in China

    International Nuclear Information System (INIS)

    Wang Ji-Yang; Chen Mo-Xiang; Wang Ji-An; Deng Xiao; Wang Jun; Shen Hsien-Chieh; Hsiung Liang-Ping; Yan Shu-Zhen; Fan Zhi-Cheng; Liu Xiu-Wen

    1981-01-01

    Geothermal studies have been conducted in China continuosly since the end of the 1950's with renewed activity since 1970. Three areas of research are defined: (1) fundamental theoretical research of geothermics, including subsurface temperatures, terrestrial heat flow and geothermal modeling; (2) exploration for geothermal resources and exploitation of geothermal energy; (3) geothermal studies in mines. (orig./ME)

  16. Geothermal Information Dissemination and Outreach

    Energy Technology Data Exchange (ETDEWEB)

    Clutter, Ted J. [Geothermal Resources Council (United States)

    2005-02-18

    Project Purpose. To enhance technological and topical information transfer in support of industry and government efforts to increase geothermal energy use in the United States (power production, direct use, and geothermal groundsource heat pumps). Project Work. GRC 2003 Annual Meeting. The GRC convened the meeting on Oct. 12-15, 2003, at Morelia's Centro de Convenciones y ExpoCentro in Mexico under the theme, International Collaboration for Geothermal Energy in the Americas. The event was also sponsored by the Comision Federal de Electricidad. ~600 participants from more than 20 countries attended the event. The GRC convened a Development of Geothermal Projects Workshop and Geothermal Exploration Techniques Workshop. GRC Field Trips included Los Azufres and Paricutin Volcano on Oct. 11. The Geothermal Energy Association (Washington, DC) staged its Geothermal Energy Trade Show. The Annual Meeting Opening Session was convened on Oct. 13, and included the governor of Michoacan, the Mexico Assistant Secretary of Energy, CFE Geothermal Division Director, DOE Geothermal Program Manager, and private sector representatives. The 2003 Annual Meeting attracted 160 papers for oral and poster presentations. GRC 2004. Under the theme, Geothermal - The Reliable Renewable, the GRC 2004 Annual Meeting convened on Aug. 29-Sept. 1, 2004, at the Hyatt Grand Champions Resort at Indian Wells, CA. Estimated total attendance (including Trade Show personnel, guests and accompanying persons) was ~700. The event included a workshop, Geothermal Production Well Pump Installation, Operation and Maintenance. Field trips went to Coso/Mammoth and Imperial Valley/Salton Sea geothermal fields. The event Opening Session featured speakers from the U.S. Department of Energy, U.S. Department of the Interior, and the private sector. The Geothermal Energy Association staged its Geothermal Energy Trade Show. The Geothermal Education Office staged its Geothermal Energy Workshop. Several local radio and

  17. Mexican geothermal development and the future

    International Nuclear Information System (INIS)

    Serrano, J.M.E.V.

    1998-01-01

    Geothermics in Mexico started in 1954, by drilling the first geothermal well in Pathe, State of Hidalgo, which reached a depth of 237 meters. In 1959 electrical generation from geothermal origin began, with an installed capacity of 3.5 MW. From 1959 to 1994 Mexico increased its installed capacity to 753 MW, by developing three geothermal fields: Cerro Prieto, Los Azufres, and Los Humeros. Currently, 177 wells produce steam at a rate of 36 tons per hour (t/h) each. Comision Federal de Electricidad (CFE, Federal Commission of Electricity) has planned to increase the geothermal-electric installed capacity through construction and installation of several projects. Repowering of operating units and development of new geothermal zones will also allow Mexican geothermal growth

  18. FINANCIAL INDICATORS FOR THE ROMANIAN COMPANIES BETWEEN ELIGIBILITY AND BANKABILITY OF EU FINANCED PROJECTS

    Directory of Open Access Journals (Sweden)

    Droj Laurentiu

    2014-12-01

    Full Text Available The main goal of this research is to compare the eligibility indicators for accessing EU projects with the bankability indicators at the level of Romanian companies. This study was realized in a period when the term of bankability seems to be in the focus of the beneficiaries and management authorities for European funding, of the banking system and of the mass-media as well. This happens for the first time since the launch in 2007-2008 of the main structural EU funding programs focusing on the development of competitive SMEs, which brought significant changes in the EU funding environment. The same with the public institutions, many SMEs have applied for grants in order to finance their investments using different funding programs, especially under the European Regional Development Fund. This process to obtain European funding was a long one in term of evaluation and contracting periods. Under this context, the initial success of SMEs that have successfully applied and even managed to gain access to European funding was overshadowed by another sharper problem: lack of financial resources for co-financing to support investments or expenditures in the initial stages funding the project. This was also a big problem since the start of word financial and economic crisis. Under this context the banking sector was supposed to be heavily involved in ensuring external financing. The main difficulties in co-financing European funding projects by the banks came from the fact that the companies were requested to obtain satisfactory scores in order to qualify for the banking loans. Several indicators were used by the banking sector to analyze the creditworthiness of the applicant companies. From these indicators we selected five of them to be tested by using Student distribution modelling within the ModelRISK – VoseSoftware application over a group of 50 companies located in the North-Western region of Romania. After the model was created in this paper we

  19. How Do Contractors Select Suppliers for Greener Construction Projects? The Case of Three Swedish Companies

    Directory of Open Access Journals (Sweden)

    Shahin Mokhlesian

    2014-06-01

    Full Text Available There are many studies of contractor selection based on clients and the selection of suppliers by contractors. However, supplier selection specifically related to green construction projects has been much less studied. Green construction differs from conventional construction because of differences in its underlying principles and use of environmentally-friendly materials and technologies. This paper studies how procurers in contractor companies in Sweden adopt green projects and how contractor perception of supplier mastery of green knowledge affects supplier selection. The investigation is based on a set of semi-structured interviews conducted among three large contractors in Sweden. A main finding is that the perceived differences between green and conventional projects do not change supplier selection dramatically. An implication is that “greener projects” is a more appropriate denotation than “green project”. Evidence shows that suppliers’ green knowledge is an important factor in supplier selection, as respondents rated suppliers’ knowledge of green projects as very important, and to fix his, there was a consensus among respondents about the need for close collaboration between contractors and suppliers. To ensure knowledge acquisition from suppliers and to increase their competitive advantage over rivals, contractors collaborate with their suppliers in a partnering setting. It is anticipated that the results of this study will be used to fill the gap in the literature on supplier selection in green projects and can also be used for construction firms contemplating getting involved in green projects.

  20. Organization of project works in Industry 4.0 digital item designing companies

    Science.gov (United States)

    Gurjanov, A. V.; Zakoldaev, D. A.; Shukalov, A. V.; Zharinov, I. O.

    2018-05-01

    The task of the project works organization in the Industry 4.0 item designing digital factories is being studied. There is a scheme of the item designing component life cycle. There is also a scheme how to develop and confirm the quality of the item designing component documentation using the mathematical modelling. There is a description of the self-organization principles for the cyber and physical technological equipment in the Industry 4.0 «smart factory» company during the manufacturing process.

  1. The Marketplace Variables in Successful and Unsuccessful NPD Projects in Technology Intensive Companies

    Directory of Open Access Journals (Sweden)

    Matti J. Haverila

    2010-12-01

    Our findings indicate that managers perceive the marketplace in multiple ways during the NPD process and also that differences exist in metric equivalence across successful and unsuccessful NPD projects. Also, although half of the marketplace variables are positively related to NPD success, managers in Finnish technology companies appear to attach higher relative importance to market attractiveness rather than market competitiveness variables. Marketplace variables appear to be less important than in the Korean and Chinese samples, and much more important than  in the Canadian sample in the Mishra et all study (1996, and similarly much more important than in the Cooper study (1979b.

  2. Geothermal energy

    Directory of Open Access Journals (Sweden)

    Manzella A.

    2015-01-01

    Full Text Available Geothermal technologies use renewable energy resources to generate electricity and direct use of heat while producing very low levels of greenhouse-gas (GHG emissions. Geothermal energy is stored in rocks and in fluids circulating in the underground. Electricity generation usually requires geothermal resources temperatures of over 100°C. For heating, geothermal resources spanning a wider range of temperatures can be used in applications such as space and district heating (and cooling, with proper technology, spa and swimming pool heating, greenhouse and soil heating, aquaculture pond heating, industrial process heating and snow melting. Geothermal technology, which has focused so far on extracting naturally heated steam or hot water from natural hydrothermal reservoirs, is developing to more advanced techniques to exploit the heat also where underground fluids are scarce and to use the Earth as a potential energy battery, by storing heat. The success of the research will enable energy recovery and utilization from a much larger fraction of the accessible thermal energy in the Earth’s crust.

  3. Communication network structure parameters and new knowledge generation capabilities in companies engaged in industry control system engineering projects

    Directory of Open Access Journals (Sweden)

    Titov Sergei

    2016-01-01

    Full Text Available Engineering companies engaged in business of industry control systems need to manage the processes of generation of innovations within and across their projects. Generation and diffusion of innovations materialize through the communication networks of project teams. Therefore, it is possible to hypothesize that the characteristics of communication networks play role in generation of new knowledge. With the data from 14 industry control system projects of a Russian engineering company the communication network structure characteristics were calculated and the analysis of correlation between these characteristics and knowledge generation capabilities was performed. As a result correlation between centralization of communication and the number of new technical solutions developed in projects was discovered.

  4. Potential Use of Communications and Project Management Systems in Remote Construction Projects: The Case of Saudi Electric Company

    Directory of Open Access Journals (Sweden)

    Bhzad Sidawi

    2012-01-01

    Full Text Available Remote projects have their unique problems that are caused mainly by the remoteness of the project itself thus the loose control over management. This is due to a number of reasons such as lack of human resources and infrastructure. Research studies that were undertaken worldwide - regarding this issue- has highlighted few unique management problems. The aim of this paper is to investigate how far the IT tools would help in managing remote construction projects in the Kingdom of Saudi Arabia (KSA. Due to the lack of previous research regarding remote projects within the Gulf region and the KSA, a pilot study was conducted in 2009 to define and test the wording of questions that are part of the main survey. The main survey was undertaken on Saudi Electric Company (SEC. The study found that IT systems and tools have the potential but this potential is hindered by a number of technical, managerial, staff factors. Therefore, successful application of IT systems would require changes to the present management settings at various levels. This would ensure that the SEC is capable of achieving the full benefit from using these advanced systems.

  5. Gulf Coast geopressured-geothermal program summary report compilation. Volume 2-B: Resource description, program history, wells tested, university and company based research, site restoration

    Energy Technology Data Exchange (ETDEWEB)

    John, C.J.; Maciasz, G.; Harder, B.J.

    1998-06-01

    The US Department of Energy established a geopressured-geothermal energy program in the mid 1970`s as one response to America`s need to develop alternate energy resources in view of the increasing dependence on imported fossil fuel energy. This program continued for 17 years and approximately two hundred million dollars were expended for various types of research and well testing to thoroughly investigate this alternative energy source. This volume describes the following studies: Design well program; LaFourche Crossing; MG-T/DOE Amoco Fee No. 1 (Sweet Lake); Environmental monitoring at Sweet Lake; Air quality; Water quality; Microseismic monitoring; Subsidence; Dow/DOE L.R. Sweezy No. 1 well; Reservoir testing; Environmental monitoring at Parcperdue; Air monitoring; Water runoff; Groundwater; Microseismic events; Subsidence; Environmental consideration at site; Gladys McCall No. 1 well; Test results of Gladys McCall; Hydrocarbons in production gas and brine; Environmental monitoring at the Gladys McCall site; Pleasant Bayou No. 2 well; Pleasant Bayou hybrid power system; Environmental monitoring at Pleasant Bayou; and Plug abandonment and well site restoration of three geopressured-geothermal test sites. 197 figs., 64 tabs.

  6. Policy for geothermal energy development

    Energy Technology Data Exchange (ETDEWEB)

    Kiuchi, S [Public Utilities Bureau, Ministry of International Trade and Industry, Japan

    1973-01-01

    Government actions related to Japanese geothermal energy development in the past include: a mining and industrial research subsidy of 27 million yen granted to Kyushu Electric Power Co. in 1952, a mining and industrial research subsidy of 13 million yen granted to Japan Metals and Chemicals Co. in 1960, a study on steam production technology for geothermal power generation by Japan Metals and Chemicals Co. funded at 3.5 hundred million yen from the Research Development Corporation of Japan, and a study on steam production technology for large scale geothermal power generation by Japan Metals and Chemicals Co. funded at 7.6 hundred million yen by the Research Development Corporation of Japan. The following projects are planned by the Ministry of International Trade and Industry for 1973: a two-year geothermal power promotion including investigations into the utilization of hot water, new methods for geothermal reservoir detection and steam well drilling, and environmental effects, studies on hydrothermal systems, basic investigations for geothermal indicators in 30 areas, and a means to finance the construction of geothermal power plants in Kakkonda (Iwate Prefecture) and Hatchobara (Oita Prefecture).

  7. U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Peter; Goldman, Charles; Satchwell, Andrew

    2012-08-21

    The U.S. energy service company (ESCO) industry is an example of a private sector business model where energy savings are delivered to customers primarily through the use of performance-based contracts. This study was conceived as a snapshot of the ESCO industry prior to the economic slowdown and the introduction of federal stimulus funding mandated by enactment of the American Recovery and Reinvestment Act of 2009 (ARRA). This study utilizes two parallel analytic approaches to characterize ESCO industry and market trends in the U.S.: (1) a ?top-down? approach involving a survey of individual ESCOs to estimate aggregate industry activity and (2) a ?bottom-up? analysis of a database of ~;;3,250 projects (representing over $8B in project investment) that reports market trends including installed EE retrofit strategies, project installation costs and savings, project payback times, and benefit-cost ratios over time. Despite the onset of a severe economic recession, the U.S. ESCO industry managed to grow at about 7percent per year between 2006 and 2008. ESCO industry revenues were about $4.1 billion in 2008 and ESCOs anticipate accelerated growth through 2011 (25percent per year). We found that 2,484 ESCO projects in our database generated ~;;$4.0 billion ($2009) in net, direct economic benefits to their customers. We estimate that the ESCO project database includes about 20percent of all U.S. ESCO market activity from 1990-2008. Assuming the net benefits per project are comparable for ESCO projects that are not included in the LBNL database, this would suggest that the ESCO industry has generated ~;;$23 billion in net direct economic benefits for customers at projects installed between 1990 and 2008. There is empirical evidence confirming that the industry is evolving by installing more comprehensive and complex measures?including onsite generation and measures to address deferred maintenance?but this evolution has significant implications for customer project

  8. Enemona's Company experience in management of complex construction and modernization projects in sectors of industry and energetics

    International Nuclear Information System (INIS)

    Kalionski, V.

    2005-01-01

    The purpose of this paper is to present the Enemona's Company experience, gained during the management of complex projects related to Kozloduy NPP Modernization Program, enriched during the long-term collaboration with the international companies which are the executors of modernization projects. For the successful implementation of tasks on Framatom, Westinghouse, Atomenergo export projects, an exchange of process transfer, managerial practices were established between the Employers companies and Enemona Company, which along with the use of material resources, organization and personnel gave Enemona opportunity to implement and optimize goals that were set to the company. Some principles, approaches and methods of works have been established, based on strict scientific methods and practices that support Enemona to be competitive in order to assume fulfillment of similar projects not only at Kozloduy NPP site, but also at new projects and sites including the challenge for the erection of Belene NPP. In order to meet requirements of foreign companies, Enemona is able to apply new technologies and achievements in assurance of high quality of repair and installation activities on construction of new objects or their modernization

  9. Commission decision on the Department of Water Resources' Application for Certification for the Bottle Rock Geothermal Project

    Energy Technology Data Exchange (ETDEWEB)

    1980-11-01

    The Application for Certification for the construction of a 55 MW geothermal power plant and related facilities in Lake County was approved subject to terms identified in the Final Decision. The following are covered: findings on compliance with statutory site-certification requirements; final environmental impact report; procedural steps; evidentiary bases; need, environmental resources; public health and safety; plant and site safety and reliability; socioeconomic, land use, and cultural concerns, and transmission tap line. (MHR)

  10. Dynamic modeling of а heating system using geothermal energy and storage tank

    Directory of Open Access Journals (Sweden)

    Milanović Predrag D.

    2012-01-01

    Full Text Available This paper analyzes a greenhouse heating system using geothermal energy and storage tank and the possibility of utilization of insufficient amount of heat from geothermal sources during the periods with low outside air temperatures. Crucial for these analyses is modelling of the necessary yearly energy requirements for greenhouse heating. The results of these analyses enable calculation of an appropriate storage tank capacity so that the energy efficiency of greenhouse heating system with geothermal energy could be significantly improved. [Acknowledgement. This work was supported by Ministry of Science and Technology Development of the Republic of Serbia through the National Energy Efficiency Program (Grant 18234 A. The authors are thankful to the stuff and management of the Company “Farmakom MB PIK 7. juli - Debrc” for their assistance during the realization of this project.

  11. Results of the supplementary work to the fiscal 1994 New Sunshine Project. Development of geothermal power plants, etc. (development of production, technology for deep-seated geothermal resources); 1994 nendo new sunshine keikaku hojo jigyo seika hokokusho. Nessui riyo hatsuden plant to kaihatsu (shinbu chinetsu shigen saishu gijutsu no kaihatsu shinbu chinetsu shigen seisan gijutsu no kaihatsu)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-03-01

    The paper reports on the fiscal 1994 results of the study of the development of a technology for collecting deep-seated geothermal resources, which has been made for increasing the capacity of the geothermal power generation as a part of the New Sunshine Project. As a plan for the development, a development is made of logging equipment and its auxiliary system and then characteristics of the deep-seated geothermal well are clarified. The logging equipment is a PTSD (pressure/temperature/spinner flow-meter/fluid density) logger which stands the use at deep-seated geothermal wells of 400{degree}C and 490 kgf/cm{sup 2} and measures pressure, temperature, flow rate and fluid density under static and dynamic conditions. In this fiscal year, metal seals were developed for preventing geothermal fluids from penetrating into the PT probe. Qualities and inner/outer diameters of various kinds of structural materials used in the S probe were determined, and output necessary enough to detect the rotation number is obtained. Measuring precision of D logging by {gamma} rays was evaluated. The study was made of the monitoring technology including the borehole and ground measuring system, the borehole fluid sampling and the scale formation. Relating to the tracer widely used in monitoring of hydrothermal reservoirs, investigated was the trend of the technology from abroad. 8 refs., 60 figs., 26 tabs.

  12. Geothermal Permeability Enhancement - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Joe Beall; Mark Walters

    2009-06-30

    The overall objective is to apply known permeability enhancement techniques to reduce the number of wells needed and demonstrate the applicability of the techniques to other undeveloped or under-developed fields. The Enhanced Geothermal System (EGS) concept presented in this project enhances energy extraction from reduced permeability zones in the super-heated, vapor-dominated Aidlin Field of the The Geysers geothermal reservoir. Numerous geothermal reservoirs worldwide, over a wide temperature range, contain zones of low permeability which limit the development potential and the efficient recovery of heat from these reservoirs. Low permeability results from poorly connected fractures or the lack of fractures. The Enhanced Geothermal System concept presented here expands these technologies by applying and evaluating them in a systematic, integrated program.

  13. Results of discussions with those involved in deep geothermal energy projects; Befunde der Gespraeche mit Akteuren der tiefen Geothermie. Rueckmeldungen zum Bericht 'Betriebs- und Traegerschaftskonzept fuer eine Explorationsgesellschaft der tiefen Geothermie' (Projekt 102'924) - Schlussbericht

    Energy Technology Data Exchange (ETDEWEB)

    Keiser, U.; Goetz, R.

    2009-10-15

    This final report for the Swiss Federal Office of Energy (SFOE) takes a look at the reactions obtained in connection with the report entitled 'Operational and support concept for an exploratory company for deep geothermal energy'. Topics dealt with include: Concessions for exploratory drilling, unavailable access to experts, low level of knowledge concerning Swiss bedrock, technological developments, drilling costs and risks. Possible directions to be taken for future work are looked at, including four possible work modules.

  14. 77 FR 74882 - STP Nuclear Operating Company, South Texas Project; Notice of Availability of Draft Supplement 48...

    Science.gov (United States)

    2012-12-18

    ... Operating Company, South Texas Project; Notice of Availability of Draft Supplement 48 to the Generic Environmental Impact Statement for License Renewal of Nuclear Plants and Public Meetings for the License Renewal of South Texas Project Notice is hereby given that the U.S. Nuclear Regulatory Commission (NRC) has...

  15. Geothermal development plan: Maricopa County

    Energy Technology Data Exchange (ETDEWEB)

    White, D.H.; Goldstone, L.A.

    1982-08-01

    The Maricopa County Geothermal Development Plan evaluated the market potential for utilizing geothermal energy. The study identified six potential geothermal resource areas with temperatures less than 100{sup 0}C (212{sup 0}F) and in addition, four suspected intermediate temperature areas (90{sup 0} to 150{sup 0}C, 194{sup 0} to 300{sup 0}F). Geothermal resources are found to occur in and near the Phoenix metropolitan area where average population growth rates of two to three percent per year are expected over the next 40 years. Rapid growth in the manufacturing, trade and service sectors of the regional economy provides opportunities for the direct utilization of geothermal energy. A regional energy use analysis is included containing energy use and price projections. Water supplies are found to be adequate to support this growth, though agricultural water use is expected to diminish. The study also contains a detailed section matching geothermal resources to potential users. Two comparative analyses providing economic details for space heating projects are incorporated.

  16. Geothermal energy, an economic development tool for Murdochville; La geothermie, un outil de developpement economique pour Murdochville

    Energy Technology Data Exchange (ETDEWEB)

    Raymond, J.; Therrien, R. [Laval Univ., Quebec City, PQ (Canada). Dept. of Geology and Geological Engineering; Lemieux, A. [Commissaire industriel, Murdochville, PQ (Canada)

    2009-09-15

    A geothermal energy system will be constructed to stimulate the economy in Murdochville, Quebec. A 375 metre deep ventilation shaft measuring approximately 4.57 m in diameter at an abandoned copper mine will be use to access the geothermal energy. The Murdochville project is being funded by the Federation of Canadian Municipalities (FCM) green municipal fund and the Quebec Ministry of Municipal Affairs. The major benefit is that any commercial or industrial company wanting to settle in the industrial park can hook up to the heat pumps for free without any drilling costs. The town of Murdochville will distribute the hot water and will assume the upkeep of the system. Dollar savings will be significant for companies that consume large amounts of energy, such as greenhouses, fish farms, and agro-food companies that require hot water for food processing. Heat pumps are used to provide the energy for space heating and air conditioning. The use of these geothermal district heating systems is growing because they offer significant energy savings. The investment costs related to drilling are high, and the pay-back period on geothermal systems can be more than ten years. Mining sites, abandoned or not, are conducive to the installation of heat pump systems through either surface water or groundwater. For example, a system using geothermal groundwater could be established by drilling very few holes, and possibly none. It was concluded that the energy savings associated with a geothermal system, particularly in times of recession, may be considerable and that the local economy can be stimulated by the energy savings. This article noted that there are many abandoned and operating mines throughout Quebec that may be potential sites for such geothermal energy systems. 3 figs.

  17. 2012 geothermal energy congress. Proceedings

    International Nuclear Information System (INIS)

    2012-01-01

    Within the Geothermal Energy Congress 2012 from 13th to 16th November 2012, in Karlsruhe (Federal Republic of Germany), the following lectures were held: (1) Comparison of different methods for the design of geothermal probes on the example of the thermal utilization of smouldering fires at heaps (Sylvia Kuerten); (2) Determination of the thermo-physical features of loose rocks (Johannes Stegner); (3) Tools for the planning and operation of district heating grids (Werner Seichter); (4) geo:build - System optimisation of the cooling mode of the ground-source heat and cooling supply (Franziska Bockelmann); (5) Successful and economic conception, planning and optimization of district heating grids (Werner Seichter); (6) Treacer / Heat transfer decoupling in a heterogeneous hydrothermal reservoir characterized by geological faults in the Upper Rhine Graben (I. Ghergut); (7) Determination of the porosity, thermal conductivity and particle size distribution in selected sections of the Meisenheim-1 drilling core (Saar-Nahe basin, Rheinland-Palatinate) under consideration of geothermally relevant formulation of questions (Gillian Inderwies); (8) Innovative technologies of exploration in the Jemez Geothermal project, New Mexico, USA (Michael Albrecht); (9) Geothermal energy, heat pump and TABS - optimization of planning, operational control and control (Franziska Bockelmann); (10) The impact of large-scale geothermal probes (storage probes) on the heat transfer and heat loss (Christopher Steins); (11) Numeric modelling of the permocarbon in the northern Upper Rhine Graben (L. Dohrer); (12) Engineering measurement solutions on quality assurance in the exploitation of geothermal fields (C. Lehr); (13) Evaluation and optimization of official buildings with the near-surface geothermal energy for heating and cooling (Franziska Bockelmann); (14) On-site filtration for a rapid and cost-effective quantification of the particle loading in the thermal water stream (Johannes Birner

  18. The Oregon Geothermal Planning Conference

    Energy Technology Data Exchange (ETDEWEB)

    None

    1980-10-02

    Oregon's geothermal resources represent a large portion of the nation's total geothermal potential. The State's resources are substantial in size, widespread in location, and presently in various stages of discovery and utilization. The exploration for, and development of, geothermal is presently dependent upon a mixture of engineering, economic, environmental, and legal factors. In response to the State's significant geothermal energy potential, and the emerging impediments and incentives for its development, the State of Oregon has begun a planning program intended to accelerate the environmentally prudent utilization of geothermal, while conserving the resource's long-term productivity. The program, which is based upon preliminary work performed by the Oregon Institute of Technology's Geo-Heat Center, will be managed by the Oregon Department of Energy, with the assistance of the Departments of Economic Development, Geology and Mineral Industries, and Water Resources. Funding support for the program is being provided by the US Department of Energy. The first six-month phase of the program, beginning in July 1980, will include the following five primary tasks: (1) coordination of state and local agency projects and information, in order to keep geothermal personnel abreast of the rapidly expanding resource literature, resource discoveries, technological advances, and each agency's projects. (2) Analysis of resource commercialization impediments and recommendations of incentives for accelerating resource utilization. (3) Compilation and dissemination of Oregon geothermal information, in order to create public and potential user awareness, and to publicize technical assistance programs and financial incentives. (4) Resource planning assistance for local governments in order to create local expertise and action; including a statewide workshop for local officials, and the formulation of two specific community resource development

  19. [Tampa Electric Company IGCC project]. 1996 DOE annual technical report, January--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    Tampa Electric Company`s Polk Power Station Unit 1 (PPS-1) Integrated Gasification Combined Cycle (IGCC) demonstration project uses a Texaco pressurized, oxygen-blown, entrained-flow coal gasifier to convert approximately 2,000 tons per day of coal to syngas. The gasification plant is coupled with a combined cycle power block to produce a net 250 MW electrical power output. Coal is slurried in water, combined with 95% pure oxygen from an air separation unit, and sent to the gasifier to produce a high temperature, high pressure, medium-Btu syngas with a heat content of about 250 BTUs/cf (HHV). The syngas then flows through a high temperature heat recovery unit which cools the syngas prior to its entering the cleanup systems. Molten coal ash flows from the bottom of the high temperature heat recovery unit into a water-filled quench chamber where it solidifies into a marketable slag by-product. Approximately 10% of the raw, hot syngas at 900 F is designed to pass through an intermittently moving bed of metal-oxide sorbent which removes sulfur-bearing compounds from the syngas. PPS-1 will be the first unit in the world to demonstrate this advanced metal oxide hot gas desulfurization technology on a commercial unit. The emphasis during 1996 centered around start-up activities.

  20. Uncertainty analysis of geothermal energy economics

    Science.gov (United States)

    Sener, Adil Caner

    This dissertation research endeavors to explore geothermal energy economics by assessing and quantifying the uncertainties associated with the nature of geothermal energy and energy investments overall. The study introduces a stochastic geothermal cost model and a valuation approach for different geothermal power plant development scenarios. The Monte Carlo simulation technique is employed to obtain probability distributions of geothermal energy development costs and project net present values. In the study a stochastic cost model with incorporated dependence structure is defined and compared with the model where random variables are modeled as independent inputs. One of the goals of the study is to attempt to shed light on the long-standing modeling problem of dependence modeling between random input variables. The dependence between random input variables will be modeled by employing the method of copulas. The study focuses on four main types of geothermal power generation technologies and introduces a stochastic levelized cost model for each technology. Moreover, we also compare the levelized costs of natural gas combined cycle and coal-fired power plants with geothermal power plants. The input data used in the model relies on the cost data recently reported by government agencies and non-profit organizations, such as the Department of Energy, National Laboratories, California Energy Commission and Geothermal Energy Association. The second part of the study introduces the stochastic discounted cash flow valuation model for the geothermal technologies analyzed in the first phase. In this phase of the study, the Integrated Planning Model (IPM) software was used to forecast the revenue streams of geothermal assets under different price and regulation scenarios. These results are then combined to create a stochastic revenue forecast of the power plants. The uncertainties in gas prices and environmental regulations will be modeled and their potential impacts will be

  1. Geothermal tomorrow 2008

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2009-01-18

    Contributors from the Geothermal Technologies Program and the geothermal community highlight the current status and activities of the Program and the development of the global resource of geothermal energy.

  2. The deep geothermal project along the shore of the Lake of Geneva - Synthesis report of Phase A; Projet de geothermie profonde sur la cote vaudoise. Rapport de synthese de la phase A - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Vallat, P. [CCMP Plus, Gland (Switzerland)

    2009-04-15

    Preliminary studies have shown the geothermal potential of deep aquifers in the region named 'La Cote' between the Jura mountain and the Lake of Geneva, between Geneva and Lausanne, Switzerland. The present synthesis report reviews the geological features of the region - known from previous boring - and the expected heat demand in the region. Several sites have been identified where cost-covering operation of a geothermal district heating is expected. Recommendations for the following steps of the project are given.

  3. FY 1974 Report on results of Sunshine Project. Feasibility study on techniques for measurement of conditions within geothermal wells; 1974 nendo chinetsu koseinai sokutei gijutsu ni kansuru feasibility study

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1975-03-01

    This report covers the principles and methods of various bed-detecting techniques and their application, to begin with, current status of these techniques, results of feasibility studies on system data processing, well mouth analyzing systems, how to develop techniques for detecting geothermal beds, bed-detecting systems and environment-simulating devices, and finally conclusions, for the subject research and development project. The detecting techniques used for the geothermal area include those based on electrical properties, temperature, pressure and flow rate, analysis of core and fluids collected by analyzing systems at the well mouths, and detection of H{sub 2}S gas. Evaluation of geothermal reservoirs needs the data of absolute temperature of the geothermal sources, quantities of vapors spouting out of the wells, depth of boiling planes and pressure; and other basic data, e.g., void volumes of broad sense, quantitative evaluation results of cracks, shapes of naked well walls, expansion of reservoirs relative to bed, and effective bed thickness, which are determined by bed-detecting techniques for physical properties. It is necessary to develop the bed-detection systems adequately covering bed-detection items, detection of production beds for geothermal measurement, other bed-detection systems, and heat-resistant wire line cables and other cables serviceable at high temperature, as the essential items for obtaining the above data. (NEDO)

  4. Federal Geothermal Research Program Update Fiscal Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    2005-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently

  5. Federal Geothermal Research Program Update - Fiscal Year 2004

    Energy Technology Data Exchange (ETDEWEB)

    Patrick Laney

    2005-03-01

    The Department of Energy (DOE) and its predecessors have conducted research and development (R&D) in geothermal energy since 1971. The Geothermal Technologies Program (GTP) works in partnership with industry to establish geothermal energy as an economically competitive contributor to the U.S. energy supply. Geothermal energy production, a $1.5 billion a year industry, generates electricity or provides heat for direct use applications. The technologies developed by the Geothermal Technologies Program will provide the Nation with new sources of electricity that are highly reliable and cost competitive and do not add to America's air pollution or the emission of greenhouse gases. Geothermal electricity generation is not subject to fuel price volatility and supply disruptions from changes in global energy markets. Geothermal energy systems use a domestic and renewable source of energy. The Geothermal Technologies Program develops innovative technologies to find, access, and use the Nation's geothermal resources. These efforts include emphasis on Enhanced Geothermal Systems (EGS) with continued R&D on geophysical and geochemical exploration technologies, improved drilling systems, and more efficient heat exchangers and condensers. The Geothermal Technologies Program is balanced between short-term goals of greater interest to industry, and long-term goals of importance to national energy interests. The program's research and development activities are expected to increase the number of new domestic geothermal fields, increase the success rate of geothermal well drilling, and reduce the costs of constructing and operating geothermal power plants. These improvements will increase the quantity of economically viable geothermal resources, leading in turn to an increased number of geothermal power facilities serving more energy demand. These new geothermal projects will take advantage of geothermal resources in locations where development is not currently possible or

  6. Research on geothermal chemistry and advanced instrumentation

    Science.gov (United States)

    Robertus, R. J.; Shannon, D. W.; Sullivan, R. G.; Kindle, C. H.; Pool, K. H.

    1985-09-01

    Research at the Pacific Northwest Laboratory (PNL) focuses on long-term geothermal power plant reliability. Past work concentrated on development of continuous high-temperature probes for monitoring process variables. PNL also completed a comprehensive handbook of brine treatment processes as they relate to injection well longevity. A recently completed study analyzed corrosion in the hydrocarbon system of a binary cycle plant. Over the two-year monitoring period, corrosion rates were less than 1 MPY in any part of the hydrocarbon system. The system was kept completely dry so the rates seem reasonable. Present projects include: (1) determination of gas breakout conditions at the Herber Binary Demonstration Plant operated by San Diego Gas and Electric Company; (2) generation of water mixing solubility data; (3) installation of prototype leak detectors at the Herber Plant; and (4) evaluation of state-of-the-art particle counters.

  7. Preliminary report on the Northern California Power Agency's Notice of Intention to seek certification for NCPA Geothermal Project No. 2

    Energy Technology Data Exchange (ETDEWEB)

    1978-01-01

    This preliminary report on the Northern California Power Agency (NCPA) geothermal power plant proposal has been prepared pursuant to California Public Resources Code Sections 25510, 25512, and 25540. It presents the preliminary Findings of fact and Conclusions adopted by the Commission Committee assigned to conduct proceedings on the Notice. In addition, the report contains a description of the proposed project, a summary of the proceedings to date, and local, state, and Federal government agency comments on the proposal. Finally, the report presents the Committee's view of those issues that require further consideration in future proceedings on the Notice. Pursuant to Public Resources Code Sections 25512 and 25540, the report presents preliminary Findings and Conclusions on: (1) conformity to the forecast of statewide and service area electric power demands; (2) the degree to which the proposed site and facility conform with applicable local, regional, state and Federal standards, ordinances, and laws; and (3) the safety and reliability of the facility.

  8. FY 1974 Report on results of Sunshine Project. Study on physicochemical properties of rocks in geothermal districts; 1974 nendo chinetsu chitai ni okeru ganseki no butsuri kagakuteki tokusei ni kansuru kenkyu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1975-03-01

    The geothermal district is characterized by distributions of high temperature and hot water. The beds and rocks in these areas are characteristically altered by these conditions. It is an object of this research and development project to clarify how properties of the beds and rocks in these areas, exposed to the characteristic physicochemical conditions, differ from properties of those in other areas. There are may rock properties. In this project, the studied properties are centered by those used for physical exploitation (or geophysical methods), e.g., electrical properties (electrical exploitation), magnetic properties (magnetic exploitation), and thermal conductivity (measurement of heat flow rates and geothermal gradients). The FY 1974 project covers pigeonholing the basic data, establishment of the experimental procedures, and measurement of water quality characteristics and temperature distributions (geothermal temperature gradients) at the test site. This paper reports the results categorized by (I) measurement of rock resistivity and effects on moisture content on this property, (II) properties of water in the geothermal district (Yahata-daira District), and (III) relationships between rock thermal conductivity and other properties. (NEDO)

  9. Geothermal energy

    Energy Technology Data Exchange (ETDEWEB)

    Gasparovic, N

    1962-07-01

    Live steam, transformed steam, and steam produced by expansion flashing are outlined with respect to their use in the production of electricity. The capacity, pressure, and temperature of a steam must be determined empirically by exploratory drilling. These factors are dependent on time and on the extent of nearby drilling-activity. Particulars of geothermal-steam power-plants such as steam dryness, hot-water flashing, condensation, gas extraction, and corrosion are discussed in detail. All available data (as per 1962) concerning the costs of operation and construction of geothermal power plants are tabulated. For space-heating purposes, two basic systems are utilized. When little corrosion or precipitation is expected, an open system is used, otherwise, closed systems are necessary. The space-heating system of Reykjavik, Iceland is cited as an example. A brief description of industrial applications of geothermal energy, such as the extraction of NaCl, D/sub 2/O, or boric acid, is provided. Thirty-two references are given.

  10. Geothermal heat pumps - gaining ground in the UK and worldwide

    International Nuclear Information System (INIS)

    Curtis, Robin

    2001-01-01

    This 2001 edition of the guide to UK renewable energy companies examines the geothermal heat pump sector, and discusses the technology involved, installations of geothermal heat pumps, the activity in the UK market with increased interest in UK geothermal heat pump products from abroad, and developments in the building sector. The UK government's increased support for the industry including its sponsorship of the Affordable Warmth programme, and the future potential of ground source systems are discussed

  11. Materials selection guidelines for geothermal energy utilization systems

    Energy Technology Data Exchange (ETDEWEB)

    Ellis, P.F. II; Conover, M.F.

    1981-01-01

    This manual includes geothermal fluid chemistry, corrosion test data, and materials operating experience. Systems using geothermal energy in El Salvador, Iceland, Italy, Japan, Mexico, New Zealand, and the United States are described. The manual provides materials selection guidelines for surface equipment of future geothermal energy systems. The key chemical species that are significant in determining corrosiveness of geothermal fluids are identified. The utilization modes of geothermal energy are defined as well as the various physical fluid parameters that affect corrosiveness. Both detailed and summarized results of materials performance tests and applicable operating experiences from forty sites throughout the world are presented. The application of various non-metal materials in geothermal environments are discussed. Included in appendices are: corrosion behavior of specific alloy classes in geothermal fluids, corrosion in seawater desalination plants, worldwide geothermal power production, DOE-sponsored utilization projects, plant availability, relative costs of alloys, and composition of alloys. (MHR)

  12. Coordination of Project and Current Activities on the Basis of the Strategy Alignment Metamodel in the Oil and Gas Company

    Directory of Open Access Journals (Sweden)

    R. Yu. Dashkov

    2017-01-01

    Full Text Available Purpose: the purpose of this article is to describe the Strategy Alignment Metamodel of the project and current activities, which allows us to connect the Goals and Strategies for Phases of the project with the Goals and Strategies of the company at all levels of the organization through targeted measurement and application of Interpretive Models. Building Networks of Goals and Strategies, and adopting organizational solutions, you coordinate the interaction of the Project office and departments of the company. This methodology is based on a Logical Rationale of the Contexts and Assumptions for establishing Goals and Strategies both for the project and for the company, and on preparation of Contexts and Assumptions, Goals and Strategies Alignment Matrices, which provides a flexible adaptation to the internal and external environment in the process of selecting the most successful Strategies to achieve the Goals. Methods: this article is based on the concept of Goals-Questions-Metrics+ Strategies, which is adapted as another concept of strategic monitoring and control system of projects: Goals-Phases-Metrics+Strategies. These concepts have formed the basis of the Strategy Alignment Metamodel, where a technology of Phases Earned Value Management is used as a measurement system for the project activity, and Balanced scorecard is applied for current operations. Results: strategy Alignment Metamodel of the project and current activities of the company is proposed hereby. It uses modern strategic monitoring and control systems for projects: Goals-Phases-Metrics+Strategies, and for the company: Goals-Questions-Metrics+ Strategies. The interaction between these systems is based on Contexts and Assumptions, Goals and Strategies Alignment Matrices. The existence of such matrices greatly simplifies management decisions and prevents the risk of delays in the execution of project Phases based on rational participation and coordination of the company

  13. Geothermal Power Generation Plant

    Energy Technology Data Exchange (ETDEWEB)

    Boyd, Tonya [Oregon Inst. of Technology, Klamath Falls, OR (United States). Geo-Heat Center

    2013-12-01

    Oregon Institute of Technology (OIT) drilled a deep geothermal well on campus (to 5,300 feet deep) which produced 196°F resource as part of the 2008 OIT Congressionally Directed Project. OIT will construct a geothermal power plant (estimated at 1.75 MWe gross output). The plant would provide 50 to 75 percent of the electricity demand on campus. Technical support for construction and operations will be provided by OIT’s Geo-Heat Center. The power plant will be housed adjacent to the existing heat exchange building on the south east corner of campus near the existing geothermal production wells used for heating campus. Cooling water will be supplied from the nearby cold water wells to a cooling tower or air cooling may be used, depending upon the type of plant selected. Using the flow obtained from the deep well, not only can energy be generated from the power plant, but the “waste” water will also be used to supplement space heating on campus. A pipeline will be construction from the well to the heat exchanger building, and then a discharge line will be construction around the east and north side of campus for anticipated use of the “waste” water by facilities in an adjacent sustainable energy park. An injection well will need to be drilled to handle the flow, as the campus existing injection wells are limited in capacity.

  14. 77 FR 14010 - Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC...

    Science.gov (United States)

    2012-03-08

    ..., EG12-18-000, EG12-19-000, EG12- 20-000, EG12-21-000, EG12-22-000, EG12-23-000] Rocky Ridge Wind Project, LLC, Blackwell Wind, LLC, CPV Cimarron Renewable Energy Company, LLC, Minco Wind Interconnection Services, LLC, Shiloh III Lessee, LLC, California Ridge Wind Energy LLC, Perrin Ranch Wind, LLC, Erie Wind...

  15. An empirical study on the critical success factors of small to medium sized projects in a South African mining company

    Directory of Open Access Journals (Sweden)

    Du Randt, Francois Jean

    2014-08-01

    Full Text Available Projects that fail, for whatever reason, can impact negatively on society, organisations, and other stakeholders. A number of researchers have identified various critical success factors (CSFs that can influence the outcome and success of a project. This research therefore aims to determine the CSFs that influence various success measures of small- to medium-sized projects at a South African mining company, Exxaro Resources’ Grootegeluk Coal Mine. Other objectives of this research include determining the extent of the impacts of these CSFs on the different success measures of a project. The investigation suggests that there are correlations among CSFs, and that certain factors impact the outcome of projects far more than others. This research finds that the single most important CSF for small- to medium-sized projects is the selection of a competent project manager. The competent project manager is characterised by a group of interrelated CSF factors: good leadership, commitment, and learning from past experiences. Based on the research results, other CSFs are discussed and explored in order for recommendations to be made on how this mining company, and possibly other organisations, can achieve greater project success.

  16. Performance indices of project companies virtual divisions in the construction in CAD conditions

    Directory of Open Access Journals (Sweden)

    Sinenko Sergey

    2017-01-01

    Full Text Available At the present time we consider the construction operations development triggered by the modern technologies development. The electronics, robotics, artificial intelligence, wireless technologies and more became the present-day production attribute. The creation of virtual organizations has become the expected solution of business communities. Following in the footsteps of information boom, in this article we consider the problem of construction field virtualisation, in particular: characteristics of virtuality and virtual structures operation, in-virtual organization work peculiarities, difficulties faced by the company manager with such form of work and criteria for the assessment of organization efficiency. The virtual organization is deemed to be the voluntary cooperation form of partners, aimed at project work type. This is the unique team, the basic resources of which are time and technologies. In general such organization does not have any geographical origin and it works using the Internet. In the context given herein, the virtual structure is considered in CAD conditions that is based on the high degree of construction field IT. Specific relations between the employees make the impact on the work process, therefore a number of both subjective (social, individual, etc. and objective (financial indices are given.

  17. Geothermal Modesty

    International Nuclear Information System (INIS)

    Anon.

    2004-01-01

    This publication of the Areva Group, a world nuclear industry leader, provides information on the energy in many domains. This issue deals with the uses for radioactivity, the future of the green electricity, the energy policy of Rhone-alps region, the end of the nuclear in Belgium, the nuclear propulsion to explore the solar system, the involvement of the Unites States in the hydrogen development, the gas exportation of China. A special part is devoted to the possibility of the geothermal energy. (A.L.B.)

  18. The Bonneville Power Administration's geothermal program

    International Nuclear Information System (INIS)

    Darr, G.D.

    1990-01-01

    Despite being a power source with many desirable characteristics, geothermal has not been developed in the Pacific Northwest because of high costs, high risks, and the lack of a market for power. The region will require new power sources in the 1990s, and will need to know to what extent it can rely on geothermal. The Bonneville Power Administration has developed a geothermal RD and D program which includes a proposal to award power contracts to three pilot projects in the Northwest. Public outreach efforts, environmental base line studies, and economic and land use impact studies will also be undertaken. In this paper two projects already under way are discussed

  19. Energy source completion for geothermal district heating systems

    International Nuclear Information System (INIS)

    Popovski, Kiril

    2000-01-01

    Geothermal district heating systems differs from the others mainly in the part of energy source completion and its connection to the heat distribution systems rather known problem. Even rather known problematic in the countries where geothermal energy is in wide application, new appearances of mistakes are always present due to the fact that necessary literature is difficult to be found. Essentials of the geothermal well completion and connection of geothermal source to the district heating distribution system are summarized in the paper and several examples of geothermal projects in flow are presented. (Author)

  20. Geothermal heating saves energy

    International Nuclear Information System (INIS)

    Romsaas, Tor

    2003-01-01

    The article reviews briefly a pioneer project for a construction area of 200000 m''2 with residences, business complexes, a hotel and conference centre and a commercial college in Oslo. The energy conservation potential is estimated to be about 60-70 % compared to direct heating with oil, gas or electricity as sources. There will also be substantial reduction in environmentally damaging emissions. The proposed energy central combines geothermal energy sources with heat pump technology, utilises water as energy carrier and uses terrestrial wells for energy storage. A cost approximation is presented

  1. Status of geothermal resources in Mexico

    International Nuclear Information System (INIS)

    Le-Bert, G.

    1990-01-01

    Except for some isolated instances with tourist or therapeutic objectives and some attempts in the Cerro Prieto geothermal field, there are no projects for direct heat utilization of geothermal resources in Mexico. Therefore, all places that are studied are studied with geothermal-electric objectives. It is convenient to keep in mind that in Mexico, by law, the Comision Federal de Electricidad (CFE) is the public utility in charge of electrical energy service. This institution is directly responsible for the exploration, development and commercial use of geothermal energy for electrical generation. Therefore, this paper includes the present and planned exploration and utilization of geothermal resources only for electricity generation for the period 1985 to the present. Likewise, starting 5 years ago, the CFE efforts have been directed toward the development of high enthalpy fields

  2. Kaizen-Driven Approach While Managing Industrial Projects. A Scandinavian Company Succeeds in Eastern Europe

    Directory of Open Access Journals (Sweden)

    Popescu Daniel

    2015-02-01

    Full Text Available Eastern European companies have experienced various and radical transformations, as resultof the economic crises and turbulences, which exposed structural weaknesses. In the meantime, long-term challenges - such as globalization, shift of power centers from the nationallevel to international structures or scarcity of resources - intensify. Given this context, it ismandatory for companies to develop strategies aiming at being competitive.

  3. Federal Geothermal Research Program Update, FY 2000

    Energy Technology Data Exchange (ETDEWEB)

    Renner, Joel Lawrence

    2001-08-01

    The Department of Energy's Geothermal Program serves two broad purposes: 1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and 2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermal systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research.

  4. Geothermal Brief: Market and Policy Impacts Update

    Energy Technology Data Exchange (ETDEWEB)

    Speer, B.

    2012-10-01

    Utility-scale geothermal electricity generation plants have generally taken advantage of various government initiatives designed to stimulate private investment. This report investigates these initiatives to evaluate their impact on the associated cost of energy and the development of geothermal electric generating capacity using conventional hydrothermal technologies. We use the Cost of Renewable Energy Spreadsheet Tool (CREST) to analyze the effects of tax incentives on project economics. Incentives include the production tax credit, U.S. Department of Treasury cash grant, the investment tax credit, and accelerated depreciation schedules. The second half of the report discusses the impact of the U.S. Department of Energy's (DOE) Loan Guarantee Program on geothermal electric project deployment and possible reasons for a lack of guarantees for geothermal projects. For comparison, we examine the effectiveness of the 1970s DOE drilling support programs, including the original loan guarantee and industry-coupled cost share programs.

  5. Geothermal direct use engineering and design guidebook

    International Nuclear Information System (INIS)

    Lienau, P.J.; Lunis, B.C.

    1991-01-01

    The Geothermal Direct Use Engineering and Design Guidebook is designed to be a comprehensive, thoroughly practical reference guide for engineers and designers of direct heat projects. These projects could include the conversion of geothermal energy into space heating and cooling of buildings, district heating, greenhouse heating, aquaculture and industrial processing. The Guidebook is directed at understanding the nature of geothermal resources and the exploration of the resources, fluid sampling techniques, drilling, and completion of geothermal wells through well testing, and reservoir evaluation. It presents information useful to engineers on the specification of equipment including well pumps, piping, heat exchangers, space heating equipment, heat pumps and absorption refrigeration. A compilation of current information about greenhouse aquaculture and industrial applications is included together with a discussion of engineering cost analysis, regulation requirements, and environmental consideration. The purpose of the Guidebook is to provide an integrated view for the development of direct use projects for which there is a very large potential in the United States

  6. Geothermal direct use engineering and design guidebook

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, P.J.; Lunis, B.C. (eds.)

    1991-01-01

    The Geothermal Direct Use Engineering and Design Guidebook is designed to be a comprehensive, thoroughly practical reference guide for engineers and designers of direct heat projects. These projects could include the conversion of geothermal energy into space heating and cooling of buildings, district heating, greenhouse heating, aquaculture and industrial processing. The Guidebook is directed at understanding the nature of geothermal resources and the exploration of the resources, fluid sampling techniques, drilling, and completion of geothermal wells through well testing, and reservoir evaluation. It presents information useful to engineers on the specification of equipment including well pumps, piping, heat exchangers, space heating equipment, heat pumps and absorption refrigeration. A compilation of current information about greenhouse aquaculture and industrial applications is included together with a discussion of engineering cost analysis, regulation requirements, and environmental consideration. The purpose of the Guidebook is to provide an integrated view for the development of direct use projects for which there is a very large potential in the United States.

  7. Geothermal direct use engineering and design guidebook

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R.G.; Culver, G.; Ellis, P.F.; Higbee, C.; Kindle, C.; Lienau, P.J.; Lunis, B.C.; Rafferty, K.; Stiger, S.; Wright, P.M.

    1989-03-01

    The Geothermal Direct Use Engineering and Design Guidebook is designed to be a comprehensive, thoroughly practical reference guide for engineers and designers of direct heat projects. These projects could include the conversion of geothermal energy into space heating cooling of buildings, district heating, greenhouse heating, aquaculture and industrial processing. The Guidebook is directed at understanding the nature of geothermal resources and the exploration of these resources, fluid sampling techniques, drilling, and completion of geothermal wells through well testing, and reservoir evaluation. It presents information useful to engineers on the specification of equipment including well pumps, piping, heat exchangers, space heating equipment, heat pumps and absorption refrigeration. A compilation of current information about greenhouse, aquaculture and industrial applications is included together with a discussion of engineering cost analysis, regulation requirements, and environmental considerations. The purpose of the Guidebook is to provide an integrated view for the development of direct use projects for which there is a very potential in the United States.

  8. Report on the results of the Sunshine Project - Verification survey for geothermal exploration technology, etc. Summary. Survey of deep geothermal resource; Chinetsu tansa gijutsu tou kensho chosa. Shinbu chinetsu shigen chosa sokatsu seika hokokusho (Yoyaku)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2002-03-01

    As to the development of deep geothermal resource which is expected to contribute to increasing the capacity of future power generation in Japan, investigational study was made from FY 1992 to FY 2000, and the results were summed up. The investigational study was conducted for the hydrothermal convection type deep geothermal resource with a thermal conducting heating mechanism, of which Kakkonda is typical, including the drilling of deep exploration well using the existing technology. As a result, new information/knowledge were acquired about the thermal structure, reservoir structure and hydrothermal supply structure of the depths, and a deep geothermal model was made. Based on the model, a detailed simulation was made possible, and a whole image of the hydrothermal convection type deep geothermal resource with the thermal conducting heating mechanism was made clear. In the surface survey, observation of microearthquakes, high-accuracy MT method, etc. were carried out, and a grasp of the shape of a new granite body from the surface was made possible. Concerning the drilling technology, the geologic stratum with a temperature over 500 degrees C was successfully drilled down to a depth of 3,729m by prolonging the life of bit at the time of drilling by introducing the top drive system, the closed mud cooling device, etc. (NEDO)

  9. NEDO Forum 2000. Geothermal technology development session (new development of geothermal energy); Chinetsu gijutsu kaihatsu session. Chinetsu energy no shintenkai

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-09-01

    The following themes were presented at this session: (1) geothermal development in the future, (2) the current status of geothermal development and utilization, (3) surveys on the promotion of geothermal development, and (4) verification and investigation on geothermal exploration technologies, development of hot water utilizing power generation plants, and international cooperation on geothermal development and utilization. In Item 2, report was made on the current status of geothermal power plants in Japan and their future development targets, long-term overview of geothermal development, measures and budgets to achieve the targets of geothermal development. In Item 3, it is reported that out of 48 areas completed of the survey (including the new promotion surveyed areas), the areas possible of steam power generation and confirmed of temperatures higher than 200 degrees C are 30 areas, and the areas possible of binary power generation (using down hole pumps) and small to medium scale power generation, confirmed of temperatures of 100 to 200 degrees C are 13 areas. In Item 4, reports were made on the reservoir bed variation exploring method, surveys on deep geothermal resources, a 10-MW demonstration plant, a system to detect well bottom information during excavation of geothermal wells, a technology to collect deep geothermal resources, and a hot-rock using power generation system. In Item 5, geothermal exploration in remote islands in the eastern part of Indonesia, and the IEA cooperation projects were reported. (NEDO)

  10. Results of preliminary reconnaissance trip to determine the presence of wetlands in wet forest habitats on the Island of Hawaii as part of the Hawaii Geothermal Project, October 1993

    Energy Technology Data Exchange (ETDEWEB)

    Wakeley, J.S.; Sprecher, S.W.; Lichvar, R.

    1994-02-25

    In October 1993, the authors sampled soils, vegetation, and hydrology at eight sites representing a range of substrates, elevations, soil types, and plant community types within rainforest habitats on the Island of Hawaii. Their purpose was to determine whether any of these habitats were wetlands according to the 1987 Corps of Engineers Wetlands Delineation Manual. None of the rainforest habitats they sampled was wetland in its entirety. However, communities established on pahoehoe lava flows contained scattered wetlands in depressions and folds in the lava, where water could accumulate. Therefore, large construction projects, such as that associated with proposed geothermal energy development in the area, have the potential to impact a significant number and/or area of wetlands. To estimate those impacts more accurately, they present a supplementary scope of work and cost estimate for additional sampling in the proposed geothermal project area.

  11. The deep geothermal project in Lavey, Switzerland - Phase B: Technical and financial feasibility study - Synthesis report; Projet de geothermie profonde a Lavey (VD). Phase B : Etude de faisabilite technicofinanciere - Rapport de synthese

    Energy Technology Data Exchange (ETDEWEB)

    Bianchetti, G.; Crestin, G. [Alpgeo Sarl, Sierre (Switzerland); Dewarrat, P.; Perritaz, D. [Energie Concept SA, Bulle, (Switzerland)] [and others

    2009-06-15

    An overview of the deep geothermal project in Lavey, Switzerland is presented. The site is located near the Rhone river, where this river crosses a mountain chain in the Alps. The geology of the region is described. A well known spa is located in Lavey. The aim of the project is to generate power and deliver heat to a local district heating. Two wells should be bored to capture underground water at an appropriate temperature. The present report summarises the previous studies and focuses on the technical and financial feasibility of the future cogeneration plant. In particular, it presents the foreseen installations and the potential heat users. The costs are estimated in several possible boring scenarios. The most promising strategy is similar to that adopted decades ago in the Austrian spa of Bad Blumau. It combines geothermal energy and biomass. A business plan is presented. Recommendations for the next steps are given.

  12. Microbiological monitoring in geothermal plants

    Science.gov (United States)

    Alawi, M.; Lerm, S.; Vetter, A.; Vieth, A.; Seibt, A.; Wolfgramm, M.; Würdemann, H.

    2009-12-01

    In times of increasing relevance of alternative energy resources the utilization of geothermal energy and subsurface energy storage gains importance and arouses increasing interest of scientists. The research project “AquiScreen” investigates the operational reliability of geothermally used groundwater systems under microbial, geochemical, mineralogical and petrological aspects. Microbiological analyses based on fluid and solid phases of geothermal systems are conducted to evaluate the impact of microbial populations on these systems. The presentation focuses on first results obtained from microbiological monitoring of geothermal plants located in two different regions of Germany: the North German Basin and the Molasse Basin in the southern part characterized by different salinities and temperatures. Fluid and filter samples taken during regular plant operation were investigated using genetic fingerprinting based on PCR-amplified 16S rRNA genes to characterize the microbial biocenosis of the geothermal aquifer. Sequencing of dominant bands of the fingerprints and the subsequent comparison to 16S rRNA genes from public databases enables a correlation to metabolic classes and provides information about the biochemical processes in the deep biosphere. The genetic profiles revealed significant differences in microbiological community structures of geothermal aquifers investigated. Phylogenetic analyses indicate broad metabolical diversity adapted to the specific conditions in the aquifers. Additionally a high amount of so far uncultivated microorganisms was detected indicating very specific indigenous biocenosis. However, in all geothermal plants bacteria were detected despite of fluid temperatures from 45° to 120°C. The identified microorganisms are closely related to thermophilic and hyperthermophilic species detectable in hot wells and hot springs, like Thermus scotoductus and Thermodesulfovibrio yellowstonii, respectively. Halophilic species were detected in

  13. CORPORATE GOVERNANCE IN THE INTEGRATED REPORTING FRAMEWORK: DISCLOSURE OF BRAZILIAN COMPANIES PARTICIPANTS IN THE PILOT PROJECT

    Directory of Open Access Journals (Sweden)

    Ana Cristina Silva Abreu

    2016-07-01

    Full Text Available This paper analyzes how Brazilian companies adhered the IIRC’s framework for integrated reporting, regarding the content element of corporate governance. The 2013 annual reporting of each company were analyzed consonants to the IIRC's framework using qualitative analysis. Categories were created for adherence of information provided by companies and applied content analysis for this purpose. Results suggest that the framework, although not being adopted integrally by the companies, was used as guide for their disclosure practices. Among other observed results for each of framework topics, BRF S.A, CPFL Energia and Itaú Unibanco disclosure practices featured as examples of adherence for the IIRC model and the inherent principles integrated in the report.

  14. Deep Geothermal Energy Production in Germany

    Directory of Open Access Journals (Sweden)

    Thorsten Agemar

    2014-07-01

    Full Text Available Germany uses its low enthalpy hydrothermal resources predominantly for balneological applications, space and district heating, but also for power production. The German Federal government supports the development of geothermal energy in terms of project funding, market incentives and credit offers, as well as a feed-in tariff for geothermal electricity. Although new projects for district heating take on average six years, geothermal energy utilisation is growing rapidly, especially in southern Germany. From 2003 to 2013, the annual production of geothermal district heating stations increased from 60 GWh to 530 GWh. In the same time, the annual power production increased from 0 GWh to 36 GWh. Currently, almost 200 geothermal facilities are in operation or under construction in Germany. A feasibility study including detailed geological site assessment is still essential when planning a new geothermal facility. As part of this assessment, a lot of geological data, hydraulic data, and subsurface temperatures can be retrieved from the geothermal information system GeotIS, which can be accessed online [1].

  15. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 3: Appendices

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains Appendices A--I which contain the following: glossary/abbreviations; scoping report; structure coordinate summary; air quality; biological resources; geology; noise; visual contrast rating forms; and cultural resources

  16. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    Energy Technology Data Exchange (ETDEWEB)

    Smith-Perera, Aida [Universidad Metropolitana de Caracas, Departamento de Gestion Tecnologica, Caracas 1071, Edo Miranda (Venezuela); Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual [Universidad Politecnica de Valencia, Departamento de Proyectos de Ingenieria, Camino de vera s/n 46022 Valencia (Spain)

    2010-08-15

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  17. A Project Strategic Index proposal for portfolio selection in electrical company based on the Analytic Network Process

    International Nuclear Information System (INIS)

    Smith-Perera, Aida; Garcia-Melon, Monica; Poveda-Bautista, Rocio; Pastor-Ferrando, Juan-Pascual

    2010-01-01

    In this paper a new approach to prioritize project portfolio in an efficient and reliable way is presented. It is based on strategic objectives of the company and multicriteria decision methods. The paper introduces a rigorous method with acceptable complexity which seeks to assist managers of a big Electrical Company of Venezuela to distribute the annual budget among the possible improvement actions to be conducted on the electrical network of Caracas. A total of 15 network improvement actions grouped into three clusters according to the strategic objectives of the company have been analyzed using the Project Strategic Index (PSI) proposed. The approach combines the use of the Analytic Network Process (ANP) method with the information obtained from the experts during the decision-making process. The ANP method allows the aggregation of the experts' judgments on each of the indicators used into one Project Strategic Index. In addition, ANP is based on utility ratio functions which are the most appropriate for the analysis of uncertain data, like experts' estimations. Finally, unlike the other multicriteria techniques, ANP allows the decision problem to be modelled using the relationships among dependent criteria. The participating experts coincided in the appreciation that the method proposed in this paper is useful and an improvement from traditional budget distribution techniques. They find the results obtained coherent, the process seems sufficiently rigorous and precise, and the use of resources is significantly less than in other methods. (author)

  18. Alaska: a guide to geothermal energy development

    Energy Technology Data Exchange (ETDEWEB)

    Basescu, N.; Bloomquist, R.G.; Higbee, C.; Justus, D.; Simpson, S.

    1980-06-01

    A brief overview is given of the geological characteristics of each region of the state as they relate to potential geothermal development. Those exploration methods which can lead to the siting of a deep exploration well are described. Requirements and techniques needed for drilling deeper higher temperature exploration and production wells are presented. Electrical generation, direct utilization, and indirect utilization are reviewed. Economic factors of direct use projects are presented. A general guide to the regulatory framework affecting geothermal energy development is provided. The general steps necessary to gain access to explore, develop, distribute, and use geothermal resources are outlined. (MHR)

  19. Washington: a guide to geothermal energy development

    Energy Technology Data Exchange (ETDEWEB)

    Bloomquist, R.G.; Basescu, N.; Higbee, C.; Justus, D.; Simpson, S.

    1980-01-01

    A brief overview is given of the geological characteristics of each region of the state as they relate to potential geothermal development. Those exploration methods which can lead to the siting of a deep exploration well are described. Requirements and techniques needed for drilling deeper higher temperature exploration and production wells are presented. Electrical generation, direct utilization, and indirect utilization are reviewed. Economic factors of direct use projects are presented. A general guide to the regulatory framework affecting geothermal energy development is provided. The general steps necessary to gain access to explore, develop, distribute, and use geothermal resources are outlined. (MHR)

  20. Computational modeling of shallow geothermal systems

    CERN Document Server

    Al-Khoury, Rafid

    2011-01-01

    A Step-by-step Guide to Developing Innovative Computational Tools for Shallow Geothermal Systems Geothermal heat is a viable source of energy and its environmental impact in terms of CO2 emissions is significantly lower than conventional fossil fuels. Shallow geothermal systems are increasingly utilized for heating and cooling of buildings and greenhouses. However, their utilization is inconsistent with the enormous amount of energy available underneath the surface of the earth. Projects of this nature are not getting the public support they deserve because of the uncertainties associated with

  1. Advanced concepts and solutions for geothermal heating applied in Oradea, Romania

    Science.gov (United States)

    Antal, C.; Popa, F.; Mos, M.; Tigan, D.; Popa, B.; Muresan, V.

    2017-01-01

    Approximately 70% of the total population of Oradea benefits from centralized heating, about 55,000 apartments and 159,000 inhabitants are connected. The heating system of Oradea consists of: sources of thermal energy production (Combined heat and power (CHP) I Oradea and geothermal water heating plants); a transport network of heat; heat distribution network for heating and domestic hot water; substations, most of them equipped with worn and obsolete equipment. Recently, only a few heat exchangers were rehabilitated and electric valves were installed to control the water flow. After heat extraction, geothermal chilled waters from the Oradea area are: discharged into the sewer system of the city, paying a fee to the local water company which manages the city’s sewers; discharged into the small river Peta; or re-injected into the reservoir. In order to ensure environmental protection and a sustainable energy development in Oradea, renewable sources of energy have been promoted in recent years. In this respect, the creation of a new well for geothermal water re-injection into the reservoir limits any accidental thermal pollution of the environment, while ensuring the conservation properties of the aquifer by recharging with geothermal chilled water. The paper presents the achievements of such a project whose aim is to replace thermal energy obtained from coal with geothermal heating. The novelty consists in the fact that within the substation we will replace old heat exchangers, circulation pumps and valves with fully automated substations operating in parallel on both a geothermal system and on a primary heating system of a thermal plant.

  2. Fiscal 1993 survey report. Joint study on inhibiting silica scale deposition cased by brines from geothermal power plant; 1993 nendo silica scale bojo gijutsu kaigai kyodo kaihatsu kanosei chosa hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-03-01

    The Indonesian and Philippine counterparts of this Japanese project are taken care of by PLN (State Electric Company) and PNOC-EDC (Philippine National Oil Company-Energy Development Corporation), respectively. PLN recommends the Kamojang geothermal area and Lahendong geothermal area for joint research sites. PNOC-EDC, though richly experienced in the removal of silica scale and in various tests concerned, has not yet established effective technologies. Under the circumstances, a suggestion is made that 5 items be added to the pH control scheme proposed by the Japanese party. PNOC recommends 3 locations in the geothermal area in the southern part of Negros Island (Palimpinon Geothermal Plants I and II) for pilot test sites. The geothermal water at the PNOC-recommended locations is extremely saline, not bringing about a desired effect even when pH is regulated to be pH4.7. Silica scale is inhibited when pH is reduced to pH4 or less, when a large quantity of acid and probably a corrosion inhibitor will be required. This may give rise to problems relating to economical efficiency. Hydrochloric acid rather than sulfuric acid is to be employed to control pH in high-salinity geothermal water. (NEDO)

  3. THE PROACTIVE MANAGEMENT MODEL OF STRATEGIC DEVELOPMENT PROJECT ON THE ENERGY SUPPLY COMPANIES IN A TURBULENT ENVIRONMENT

    Directory of Open Access Journals (Sweden)

    Михайло Збишекович ДОМБРОВСЬКИЙ

    2017-03-01

    Full Text Available A methodical approach of proactive project management model with the estimate (prediction deviation of actual results from planned at each control step is proposed. Deviation of actual results from the project planned, which takes place in the management of the energy company transformation project, as a result of action under uncertainty, determines the acceleration of work over the project plan. Implementation the scope of work, which exceeds the plan, as result of overspending of resources and budget, disrupting the stability of the project as a system. The graphic model helps to form the "corridor" tolerance based resource reserve, and the implementation of the project work is carried out according to the extension concept. Clarification allowable deviation area allows improving the model of project proactive management for each of the next execution step. Project management quality is improved by reducing the time of decision-making and increase the sustainability and efficiency by substantially reducing deviations. The conclusions about the benefits of the assessment of works and project resources balance, by using the proactive management model, which allows comparing variants of works dynamics, to implement the search for the best solution to a predetermined set of admissible, have been made.

  4. Geothermal Heat Pump Benchmarking Report

    Energy Technology Data Exchange (ETDEWEB)

    None

    1997-01-17

    A benchmarking study was conducted on behalf of the Department of Energy to determine the critical factors in successful utility geothermal heat pump programs. A Successful program is one that has achieved significant market penetration. Successfully marketing geothermal heat pumps has presented some major challenges to the utility industry. However, select utilities have developed programs that generate significant GHP sales. This benchmarking study concludes that there are three factors critical to the success of utility GHP marking programs: (1) Top management marketing commitment; (2) An understanding of the fundamentals of marketing and business development; and (3) An aggressive competitive posture. To generate significant GHP sales, competitive market forces must by used. However, because utilities have functioned only in a regulated arena, these companies and their leaders are unschooled in competitive business practices. Therefore, a lack of experience coupled with an intrinsically non-competitive culture yields an industry environment that impedes the generation of significant GHP sales in many, but not all, utilities.

  5. Geothermal Technologies Program: Alaska

    Energy Technology Data Exchange (ETDEWEB)

    2005-02-01

    This fact sheets provides a summary of geothermal potential, issues, and current development in Alaska. This fact sheet was developed as part of DOE's GeoPowering the West initiative, part of the Geothermal Technologies Program.

  6. FEATURES OF PROJECT PORTFOLIO OF HIGH TECHNOLOGY INNOVATION COMPANIES IN NANOBIOTECHNOLOGIES

    Directory of Open Access Journals (Sweden)

    Віктор Володимирович МОРОЗОВ

    2015-05-01

    Full Text Available In the article were determined main project peculiarities in the field of nanotechnologies, that significantly influence project management in science. Was shown the necessity to apply the methods of project management for realization of innovative projects, aiming to accelerate their fastest implementation in the most prominent directions of state national economy.

  7. Geothermal energy. Pt.2

    International Nuclear Information System (INIS)

    Anon.

    1990-01-01

    Geothermal energy has certain features that make it highly recommendable as a source of power production. It is noted by its high load factor; it may be used as a basic or peak source; its versatility and high availability among others. In spite of these advantages, geothermal energy has not attained a significant development up to now. There are several reasons for this to happen, while the main one is that it requires an important initial investment. Assessing if an area is potentially profitable for the obtention of a given type of energy implies performing a complex set of analyses and prospective work, but it is not so significant as that associated with petroleum. The strategy for the exploration of geothermal resources is based on the execution of consecutive stages ranging from a surveillance at a regional scale to a project feasibility study, with growing investments and using more and more complex techniques. Many Latin American countries are located in areas considered as promisory concerning the development of this type of exploitation. Another factor supporting this view is a special demographic feature, showing a very irregular distribution of the population, with extense isolated areas with a minimun number of inhabitants that does not justify the extension of the electric power network. There are plants operating in four countries producing, as a whole, 881 MW. In Argentina the activities are aimed to intensifying the knowledge about the availability of this resource within the local territory and to estimating the feasibility of its usage in areas where exploration is more advanced [es

  8. The geothermal conditions in the Rhine Graben - a summary

    Energy Technology Data Exchange (ETDEWEB)

    Rybach, L.

    2007-07-15

    This article takes a look at the situation in the upper Rhine valley with respect to its geothermal potential. The Rhine Graben, being part of the European Mid-Continental Rift System is characterised by thinned crust and therefore higher heat flow rates. According to the author, the Rhine Graben presents generally favourable conditions for geothermal energy development and utilisation. This illustrated article presents information on the geological structures to be found and figures obtained from the geothermal exploration project at Soulz-sous-Forets, France, and a number of other geothermal investigation and production projects in Germany.

  9. South Dakota geothermal handbook

    Energy Technology Data Exchange (ETDEWEB)

    1980-06-01

    The sources of geothermal fluids in South Dakota are described and some of the problems that exist in utilization and materials selection are described. Methods of heat extraction and the environmental concerns that accompany geothermal fluid development are briefly described. Governmental rules, regulations and legislation are explained. The time and steps necessary to bring about the development of the geothermal resource are explained in detail. Some of the federal incentives that encourage the use of geothermal energy are summarized. (MHR)

  10. Geothermal overviews of the western United States

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, D.N.; Axtell, L.H. (comps.)

    1972-01-01

    This compendium presents data on geothermal resources for all those western states with geothermal potential. Individual sections, which have been processed separately for inclusion in the EDB data base, are devoted to each of the following states: Arizona, California, Colorado, Hawaii, Idaho, Montana, Nevada, New Mexico, Oregon, Utah, Washington, and Wyoming. A separate section is also devoted to the U.S. Bureau of Reclamation Imperial Valley Project. Maps and references are included for each section. (JGB)

  11. The induced earthquake sequence related to the St. Gallen deep geothermal project (Switzerland): Fault reactivation and fluid interactions imaged by microseismicity

    Science.gov (United States)

    Diehl, T.; Kraft, T.; Kissling, E.; Wiemer, S.

    2017-09-01

    In July 2013, a sequence of more than 340 earthquakes was induced by reservoir stimulations and well-control procedures following a gas kick at a deep geothermal drilling project close to the city of St. Gallen, Switzerland. The sequence culminated in an ML 3.5 earthquake, which was felt within 10-15 km from the epicenter. High-quality earthquake locations and 3-D reflection seismic data acquired in the St. Gallen project provide a unique data set, which allows high-resolution studies of earthquake triggering related to the injection of fluids into macroscopic fault zones. In this study, we present a high-precision earthquake catalog of the induced sequence. Absolute locations are constrained by a coupled hypocenter-velocity inversion, and subsequent double-difference relocations image the geometry of the ML 3.5 rupture and resolve the spatiotemporal evolution of seismicity. A joint interpretation of earthquake and seismic data shows that the majority of the seismicity occurred in the pre-Mesozoic basement, hundreds of meters below the borehole and the targeted Mesozoic sequence. We propose a hydraulic connectivity between the reactivated fault and the borehole, likely through faults mapped by seismic data. Despite the excellent quality of the seismic data, the association of seismicity with mapped faults remains ambiguous. In summary, our results document that the actual hydraulic properties of a fault system and hydraulic connections between its fault segments are complex and may not be predictable upfront. Incomplete knowledge of fault structures and stress heterogeneities within highly complex fault systems additionally challenge the degree of predictability of induced seismicity related to underground fluid injections.

  12. ANALYSIS OF THE POSSIBILITY FOR ESTABLISHING PROJECT MANAGEMENT OFFICE (PMO IN COMPANIES IN SERBIA

    Directory of Open Access Journals (Sweden)

    Dragana Milin

    2012-09-01

    Full Text Available Project Management Office (PMO is an organizational unit established to help project managers, project teams and the various levels of management in carrying out the principles of project management. The research was carried out in Serbia, in 2011, with the aim to establish which methodologies and techniques are used for project m anagement, and which of them are used the most frequently. Furthermore, the need for establishment of PMOs in Serbia is discussed. These offices should help in establishing a standardized methodology (at the organization level and thus overcome the obviou s poor use of any project management methodology at all.

  13. Geothermal power production in future electricity markets-A scenario analysis for Germany

    International Nuclear Information System (INIS)

    Purkus, Alexandra; Barth, Volker

    2011-01-01

    Development and diffusion of new renewable energy technologies play a central role in mitigating climate change. In this context, small-scale deep geothermal power has seen growing interest in recent years as an environmentally friendly, non-intermittent energy source with large technical potential. Following the first successful demonstration projects, the German geothermal industry is currently experiencing an internationally unparalleled growth. In this study we explore the factors driving this development, and the role geothermal power production could play in the future of the German electricity market. For this, we apply the scenario technique, based on literature analysis and interviews with companies operating actively in the field. Our findings highlight the importance of political support and framework conditions in the electricity market, with the best prospects in a decentralised energy system based on renewable energy sources, where high investment costs and the risk of discovery failure are balanced by the benefits of low-carbon base load power. - Research highlights: → Small scale geothermal plants could provide base load for RES based power systems. → New technologies allow its use even in geologically inactive regions like Germany. → Key factors for growth are political support and power market framework conditions. → Main investment barriers are comparatively high investment costs and discovery risks. → Scale of use depends on technological evolution and energy system structure.

  14. Synergy potential for oil and geothermal energy exploitation

    DEFF Research Database (Denmark)

    Ziabakhsh-Ganji, Zaman; Nick, Hamidreza M.; Donselaar, Marinus E.

    2018-01-01

    A new solution for harvesting energy simultaneously from two different sources of energy by combining geothermal energy production and thermal enhanced heavy oil recovery is introduced. Numerical simulations are employed to evaluate the feasibility of generating energy from geothermal resources...... and feasibility analyses of the synergy potential of thermally-enhanced oil recovery and geothermal energy production are performed. A series of simulations are carried out to examine the effects of reservoir properties on energy consumption and oil recovery for different injection rates and injection temperature...... the geothermal energy could make the geothermal business case independent and may be a viable option to reduce the overall project cost. Furthermore, the results display that the enhance oil productions are able to reduce the required subsidy for a single doublet geothermal project up to 50%....

  15. An inventory control project in a major Danish company using compound renewal demand models

    DEFF Research Database (Denmark)

    Larsen, Christian; Seiding, Claus Hoe; Teller, Christian

    2008-01-01

    procedures for determining suitable inventory control variables based on the fitted demand distributions and a service-level requirement stated in terms of an order fill rate. Finally, we validated the results of our models against the procedures that had been in use in the company. It was concluded...

  16. Det europæiske Model Company Law Act Project

    DEFF Research Database (Denmark)

    Andersen, Paul Krüger; Baums, Theodor

    2008-01-01

    På initiativ af forfatterne til det følgende blev der i 2007 dannet en europæisk gruppe af fremtrædende selskabsretseksperter med henblik på at udforme en »European Model Company Law Act« (EMCLA). Gruppen holdt sit første møde i Århus i september 2007.  ...

  17. Vegetable breeding innovation in China and the Netherlands : a study at sectoral, company and project level

    NARCIS (Netherlands)

    Liu, Z.

    2013-01-01

    The seed business plays a crucial role at the basis of the food supply chain, and companies which are active in plant breeding and production and sales of seeds are embedded in a competitive environment. They continuously face challenges to develop higher yielding varieties with better or new

  18. Quality Management in Project Management Consulting. A Case Study in an International Consulting Company

    OpenAIRE

    Ceptureanu, Eduard-Gabriel; Ceptureanu, Sebastian-Ion; Luchian, Cristian-Eugen; Luchian, Iuliana

    2017-01-01

    The present paper addresses quality management from the specific perspective of project management consulting service providers, in the framework of large infrastructure projects. Because of their supposed superiority in knowledge and experience, project management consultants have an ultimate responsibility for the proper implementing of the project. Therefore, quality management in consulting organizations should focus on critical success factors. As there is no consensus yet regarding the ...

  19. Geothermal Energy in Ecuador

    International Nuclear Information System (INIS)

    Aguilera, Eduardo; Villalba, Fabio

    1999-11-01

    Energy represents an essential element for economy, and for any sustainable development strategy, assuming it is a basic input for all production activities. It is a fundamental contra int for country's competitivity and also a main component of population's standard of life. The Agenda 21 and the General Agreement on Climatic Changes emphasize that the development and sustainable use of energy should promote economy, but taking care of the environment. Under these basic concepts, for the particular case of energy, the sustain ability of development requires the adoption of a strategy which guarantee an energy supply in terms of quality, opportunity, continuity and afford ability and, in addition, without production of negative environmental impacts. Geothermal energy is a serious energetic option for sustainable development, since presents technical and economic advantages for production of electricity at medium and large scale. Furthermore, geothermal energy allows a wide spectrum of direct applications of heat in profitable projects of high social impact as green houses, drying of seeds and wood products, fish farming, recreation and others. All of them can help the increase of communal production activities in rural areas affected by poverty

  20. Geothermal energy in Montana: site data base and development status

    Energy Technology Data Exchange (ETDEWEB)

    Brown, K.E.

    1979-11-01

    A short description of the state's geothermal characteristics, economy, and climate is presented. A listing of the majority of the known hot springs is included. A discussion of present and projected demand is included. The results of the site specific studies are addressed within the state energy picture. Possible uses and process requirements of geothermal resources are discussed. The factors which influence geothermal development were researched and presented according to relative importance. (MHR)

  1. Geothermal fields of China

    Science.gov (United States)

    Kearey, P.; HongBing, Wei

    1993-08-01

    There are over 2500 known occurrences of geothermal phenomena in China. These lie mainly in four major geothermal zones: Xizang (Tibet)-Yunnan, Taiwan, East Coast and North-South. Hot water has also been found in boreholes in major Mesozoic-Cenozoic sedimentary basins. This paper presents a summary of present knowledge of these geothermal zones. The geological settings of geothermal occurrences are associated mainly with magmatic activity, fault uplift and depressional basins and these are described by examples of each type. Increased multipurpose utilisation of geothermal resources is planned and examples are given of current usages.

  2. World geothermal congress

    International Nuclear Information System (INIS)

    Povarov, O.A.; Tomarov, G.V.

    2001-01-01

    The World geothermal congress took place in the period from 28 May up to 10 June 2000 in Japan. About 2000 men from 43 countries, including specialists in the area of developing geothermal fields, creating and operating geothermal electrical and thermal plants and various systems for the earth heat application, participated in the work of the Congress. It was noted at the Congress, that development of the geothermal power engineering in the world is characterized by the large-scale application of geothermal resources for the electrical energy generation [ru

  3. Valuation of investment projects by an international oil company: a new proof of a straightforward, rigorous method

    International Nuclear Information System (INIS)

    Pierru, A.; Babusiaux, D.

    2009-02-01

    The problem studied is that of valuing investment projects of an international oil company subject to tax schemes that vary from one country to another. The existing disparities in the tax treatment of interest paid can lead the firm to seek an optimal allocation of its debt capacity among the various projects. In this context, the generalized ATWACC (After-Tax Weighted Average Cost of Capital) method presents numerous advantages over standard methods and is particularly well suited to the valuation of oil-field development projects where debt financing differs from the amount that would correspond to the debt ratio targeted by the firm at the corporate scale. In this paper, we discuss adapting the generalized ATWACC method to the specificities of the oil industry and offer new proof of its validity, based on a model that maximizes, under constraints, the firm's equity value. (authors)

  4. Geothermal energy - Overview of research in 2002; Geothermie

    Energy Technology Data Exchange (ETDEWEB)

    Gohran, H. L.

    2003-07-01

    This overview for the Swiss Federal Office for Energy reviews activities in the area of geothermal energy usage in Switzerland in 2002. Several main points of interest are discussed, including Deep Heat Mining, the thermal use of drainage water from alpine railway tunnels, the quality assurance aspects of geothermal installations and pilot and demonstration (P+D) activities designed to promote the use of geothermal energy. Also, the use of constructional elements such as energy piles and novel applications such as geothermally heated greenhouses and fish farms are discussed. Examples of various P+D projects that utilise bore-hole heat exchangers and piles are given. Also, examples of the thermal use of deep aquifers are quoted and projects involving the mapping of geothermal resources and the creation of quality labels are described. Prospects for future work are discussed. The report is rounded off with lists of research and development projects and P+D projects.

  5. Geothermal FIT Design: International Experience and U.S. Considerations

    Energy Technology Data Exchange (ETDEWEB)

    Rickerson, W.; Gifford, J.; Grace, R.; Cory, K.

    2012-08-01

    Developing power plants is a risky endeavor, whether conventional or renewable generation. Feed-in tariff (FIT) policies can be designed to address some of these risks, and their design can be tailored to geothermal electric plant development. Geothermal projects face risks similar to other generation project development, including finding buyers for power, ensuring adequate transmission capacity, competing to supply electricity and/or renewable energy certificates (RECs), securing reliable revenue streams, navigating the legal issues related to project development, and reacting to changes in existing regulations or incentives. Although FITs have not been created specifically for geothermal in the United States to date, a variety of FIT design options could reduce geothermal power plant development risks and are explored. This analysis focuses on the design of FIT incentive policies for geothermal electric projects and how FITs can be used to reduce risks (excluding drilling unproductive exploratory wells).

  6. Geothermal for kids

    International Nuclear Information System (INIS)

    Nemzer, M.; Condy, M.

    1990-01-01

    This paper reports that educating children about geothermal energy is crucial to the future growth of the geothermal industry. The Geothermal Education Office (GEO) was founded in 1989 to provide materials and support to teachers and the geothermal community in educating grades K-12 about geothermal energy. GEO's goals are to: provide easy access to or referral to appropriate sources of geothermal information; foster teacher interest; create posters, booklets, lesson plans and other educational materials; monitor and review textbooks, encyclopedias and other educational materials distributed by educational groups to ensure inclusion of appropriate, accurate information and to encourage fair treatment of alternative energy resources; contribute articles to industry, science and educational publications; and foster communication and cooperation among GEO, the geothermal industry, government agencies, and educational and environmental groups

  7. Boise geothermal district heating system

    Energy Technology Data Exchange (ETDEWEB)

    Hanson, P.J.

    1985-10-01

    This document describes the Boise geothermal district heating project from preliminary feasibility studies completed in 1979 to a fully operational system by 1983. The report includes information about the two local governments that participated in the project - the City of Boise, Idaho and the Boise Warm Springs Water District. It also discusses the federal funding sources; the financial studies; the feasibility studies conducted; the general system planning and design; design of detailed system components; the legal issues involved in production; geological analysis of the resource area; distribution and disposal; the program to market system services; and the methods of retrofitting buildings to use geothermal hot water for space heating. Technically this report describes the Boise City district heating system based on 170/sup 0/F water, a 4000 gpm production system, a 41,000 foot pipeline system, and system economies. Comparable data are also provided for the Boise Warm Springs Water District. 62 figs., 31 tabs.

  8. Quality Management in Project Management Consulting. A Case Study in an International Consulting Company

    Directory of Open Access Journals (Sweden)

    Eduard-Gabriel Ceptureanu

    2017-02-01

    Full Text Available The present paper addresses quality management from the specific perspective of project management consulting service providers, in the framework of large infrastructure projects. Because of their supposed superiority in knowledge and experience, project management consultants have an ultimate responsibility for the proper implementing of the project. Therefore, quality management in consulting organizations should focus on critical success factors. As there is no consensus yet regarding the most important aspects of the consulting activity on which depend the achievement of the project aims, there is scope for further investigating this subject. Here, the case of a project management consulting organization involved in large infrastructure projects in Romania, Bulgaria, Moldova, Ukraine and Serbia is analyzed. Data collected through a questionnaire-based survey among international consultants and support personnel suggest that factors related to leadership style and communication skills are more closely tied to the success of the project than more technical aspects. The results constitute an empirical evidence of main success factors for specialized consulting services in project management and can be useful in improving business and project performance and achieving business excellence.

  9. EVALUATION OF E-RECRUITMENT LEVEL AMONG THE LARGEST COMPANIES IN POLAND - PROJECT OF RESEARCH

    Directory of Open Access Journals (Sweden)

    Dorota Buchnowska

    2015-12-01

    Full Text Available The changes taking place in the labor market cause that it is increasingly difficult to recruit employees with the right skills and competencies to companies. To reach the right candidates, they use modern IT solutions, such as ATS (Applicant Tracking System, which are supporting the processes of recruitment. Among others, they enable the publication of job offers on the Internet - on corporate websites, job portals and business social networking services - and apply for jobs online through these channels. This article pre-sents the evolution of the use of the Internet, and particularly the social media, in the recruitment process and presents a projekt of comprehensive research, which aims is to analyze and evaluate of the level of development of e-recruitment in Poland among largest companies.

  10. The USGS national geothermal resource assessment: An update

    Science.gov (United States)

    Williams, C.F.; Reed, M.J.; Galanis, S.P.; DeAngelo, J.

    2007-01-01

    The U. S. Geological Survey (USGS) is working with the Department of Energy's (DOE) Geothermal Technologies Program and other geothermal organizations on a three-year effort to produce an updated assessment of available geothermal resources. The new assessment will introduce significant changes in the models for geothermal energy recovery factors, estimates of reservoir volumes, and limits to temperatures and depths for electric power production. It will also include the potential impact of evolving Enhanced Geothermal Systems (EGS) technology. An important focus in the assessment project is on the development of geothermal resource models consistent with the production histories and observed characteristics of exploited geothermal fields. New models for the recovery of heat from heterogeneous, fractured reservoirs provide a physically realistic basis for evaluating the production potential of both natural geothermal reservoirs and reservoirs that may be created through the application of EGS technology. Project investigators have also made substantial progress studying geothermal systems and the factors responsible for their formation through studies in the Great Basin-Modoc Plateau region, Coso, Long Valley, the Imperial Valley and central Alaska, Project personnel are also entering the supporting data and resulting analyses into geospatial databases that will be produced as part of the resource assessment.

  11. Geothermal direct-heat utilization assistance. Quarterly report, October--December 1996

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    This report summarizes geothermal technical assistance, R&D and technology transfer activities of the Geo-Heat Center at Oregon Institute of Technology for the first quarter of FY-97. It describes 174 contracts with parties during this period related to technical assistance with geothermal direct heat projects. Areas dealt with include geothermal heat pumps, space heating, greenhouses, aquaculture, equipment, economics and resources. Research activities are summarized on greenhouse peaking. Outreach activities include the publication of a geothermal direct use Bulletin, dissemination of information, geothermal library, technical papers and seminars, and progress monitor reports on geothermal resources and utilization.

  12. Development of an Advanced Stimulation / Production Predictive Simulator for Enhanced Geothermal Systems

    Energy Technology Data Exchange (ETDEWEB)

    Pritchett, John W. [Leidos, Inc., San Diego, CA (United States)

    2015-04-15

    There are several well-known obstacles to the successful deployment of EGS projects on a commercial scale, of course. EGS projects are expected to be deeper, on the average, than conventional “natural” geothermal reservoirs, and drilling costs are already a formidable barrier to conventional geothermal projects. Unlike conventional resources (which frequently announce their presence with natural manifestations such as geysers, hot springs and fumaroles), EGS prospects are likely to appear fairly undistinguished from the earth surface. And, of course, the probable necessity of fabricating a subterranean fluid circulation network to mine the heat from the rock (instead of simply relying on natural, pre-existing permeable fractures) adds a significant degree of uncertainty to the prospects for success. Accordingly, the basic motivation for the work presented herein was to try to develop a new set of tools that would be more suitable for this purpose. Several years ago, the Department of Energy’s Geothermal Technologies Office recognized this need and funded a cost-shared grant to our company (then SAIC, now Leidos) to partner with Geowatt AG of Zurich, Switzerland and undertake the development of a new reservoir simulator that would be more suitable for EGS forecasting than the existing tools. That project has now been completed and a new numerical geothermal reservoir simulator has been developed. It is named “HeatEx” (for “Heat Extraction”) and is almost completely new, although its methodology owes a great deal to other previous geothermal software development efforts, including Geowatt’s “HEX-S” code, the STAR and SPFRAC simulators developed here at SAIC/Leidos, the MINC approach originally developed at LBNL, and tracer analysis software originally formulated at INEL. Furthermore, the development effort was led by engineers with many years of experience in using reservoir simulation software to make meaningful forecasts for real geothermal

  13. Proceedings of the second NATO-CCMS information meeting on dry hot rock geothermal energy

    Energy Technology Data Exchange (ETDEWEB)

    Mortensen, J.J. (comp.)

    1977-11-01

    A summary is presented of the second and last NATO-CCMS (North Atlantic Treaty Organization--Committee on Challenges of Modern Society) Geothermal Pilot Study Information Meeting on Dry Hot Rock Geothermal Energy. Only summaries of the formal presentations are included. Overviews of the Energy Research and Development Administration (ERDA) and the U.S. Geological Survey (USGS) geothermal projects are included with emphasis on the Los Alamos Scientific Laboratory (LASL) Hot Dry Rock Geothermal Energy Development Project. Reports of developments in nine foreign countries and on geothermal projects in US universities are also presented.

  14. Marysville, Montana, Geothermal Project: Geological and Geophysical Exploration at Marysville Geothermal Area: 1973 Results (With a Section on ''Contemporary Seismicity in the Helena, Montana Region'')

    Energy Technology Data Exchange (ETDEWEB)

    Blackwell, D.D.; Brott, C.A.; Goforth, T.T.; Holdaway, M.J.; Morgan, P.; Friedline, R.; Smith, R.L.

    1974-04-01

    This report describes field geological and geophysical investigations of the Marysville geothermal area, including geological mapping, sample collection, a ground total field magnetic survey, gravity survey, seismic ground noise survey, microearthquake survey, and heat flow study. Although sufficient data are not available, it is likely that a magma chamber is the heat source. A second section, ''Contemporary Seismicity in the Helena, Montana, Region'' examines the coincidence of high heat flow and earthquake swarm activity in this region. (GRA)

  15. Geothermal Direct Heat Application Potential

    Energy Technology Data Exchange (ETDEWEB)

    Lienau, Paul J

    1989-01-01

    The geothermal direct-use industry growth trends, potential, needs, and how they can be met, are addressed. Recent investigations about the current status of the industry and the identification of institutional and technical needs provide the basis on which this paper is presented. Initial drilling risk is the major obstacle to direct-use development. The applications presented include space and district heating projects, heat pumps (heating and cooling), industrial processes, resorts and pools, aquaculture and agriculture.

  16. Swiss geothermal energy update 1985 - 1990

    International Nuclear Information System (INIS)

    Rybach, L.; Hauber, L.

    1990-01-01

    Since 1985, geothermal R and D has evolved steadily in Switzerland. REgional low-enthalphy exploration and resource assessment are largely complete; emphasis is now on drilling and development. Vertical earth-heat exchangers (small-scale, decentralized, heat pump-coupled heating facilities) increase rapidly in number; the governmental system of risk coverage for geothermal drilling, established in 1987, gives rise to several drilling projects. Of these, a single well and a doublet have been successfully completed so far. Numerical modeling of coupled thermohydraulic processes in fracture-dominate Hot Dry Rock systems including rock-mechanics aspects, is in progress. In this paper some further efforts such as contributions to general geothermics, exploration and resource assessment activities in Switzerland, and financing of geothermal development abroad by Swiss banks are described

  17. Is the Philippine geothermal resource sustainable?

    International Nuclear Information System (INIS)

    Lalo, J.; Raymundo, E.

    2005-01-01

    This paper aims to illustrate the scenario in the Geothermal Energy Development Projects in the Philippines, to make the Filipino population aware that there is an existing cleaner technology available that is being utilized in Europe; for the Philippine geothermal energy project operators to adapt a cleaner production technology that has no harmful emission, hence, no pollution technology; to help end the conflict between stake holders and geothermal players through the introduction of cleaner production technology intervention. While it is a fact that the Philippines' Geothermal resource is second to U.S. or around the globe, the unwise utilization of geothermal energy may lead to depletion, hence, becomes non-renewable. It should be understood that the geothermal energy is a renewable resource only if the development process is sustainable. There is a need to educate the Filipino populace regarding a cleaner production technology as well as our government and political leaders. This cleaner production technology is a solution to the stake holders. It is of great importance to inform the Filipino people that there is an existing cleaner new technology from Europe and U.S. that is not pollutive in nature and is essentially sustainable development scheme since underground reservoirs are not depleted in the process. (author)

  18. Evolution of the U.S. Energy Service Company Industry: Market Size and Project Performance from 1990-2008

    Energy Technology Data Exchange (ETDEWEB)

    Larsen, Peter [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Goldman, Charles A. [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States); Satchwell, Andrew [Lawrence Berkeley National Lab. (LBNL), Berkeley, CA (United States)

    2012-05-08

    The U.S. energy service company (ESCO) industry is an example of a private sector business model where energy savings are delivered to customers primarily through the use of performance-based contracts. This study was conceived as a snapshot of the ESCO industry prior to the economic slowdown and the introduction of federal stimulus funding mandated by enactment of the American Recovery and Reinvestment Act of 2009 (ARRA). This study utilizes two parallel analytic approaches to characterize ESCO industry and market trends in the U.S.: (1) a “top-down” approach involving a survey of individual ESCOs to estimate aggregate industry activity and (2) a “bottom-up” analysis of a database of -3,265 projects (representing over $8B in project investment) that reports market trends including installed EE retrofit strategies, project installation costs and savings, project payback times, and benefit-cost ratios over time. Despite the onset of an economic recession, the U.S. ESCO industry managed to grow at about 7% per year between 2006 and 2008. ESCO industry revenues are relatively small compared to total U.S. energy expenditures (about $4.1 billion in 2008), but ESCOs anticipated accelerated growth through 2011 (25% per year). We found that 2,484 ESCO projects in our database generated -$4.0 billion ($2009) in net, direct economic benefits to their customers. We estimate that the ESCO project database includes about 20% of all U.S. ESCO market activity from 1990-2008. Assuming the net benefits per project are comparable for ESCO projects that are not included in the LBNL database, this would suggest that the ESCO industry has generated -$23 billion in net direct economic benefits for customers at projects installed between 1990 and 2008. We found that nearly 85% of all public and institutional projects met or exceeded the guaranteed level of savings. We estimated that a typical ESCO project generated $1.5 dollars of direct benefits for every dollar of customer

  19. Real World Projects with Companies Supporting Competence Development in Higher Education

    Science.gov (United States)

    Baaken, Thomas; Kiel, Bert; Kliewe, Thorsten

    2015-01-01

    The department of business administration of Münster University of Applied Sciences (MUAS) in Germany has a long tradition in realising practice-oriented research projects in cooperation with industry. The objective of these cooperative projects is to offer students real-life experiences and to make the theoretical know-how of university lectures…

  20. Quality assurance project plan for ground water monitoring activities managed by Westinghouse Hanford Company. Revision 3

    International Nuclear Information System (INIS)

    Stauffer, M.

    1995-11-01

    This quality assurance project plan (QAPP) applies specifically to the field activities and laboratory analysis performed for all RCRA groundwater projects conducted by Hanford Technical Services. This QAPP is generic in approach and shall be implemented in conjunction with the specific requirements of individual groundwater monitoring plans

  1. Surveys of the distribution of seabirds found in the vicinity of proposed geothermal project subzones in the District of Puna, Hawaii. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, M.; Ritchotte, G.; Viggiano, A.; Dwyer, J.; Nielsen, B.; Jacobi, J.D. [Fish and Wildlife Service, Hawaii National Park, HI (United States). Hawaii Research Station

    1994-08-01

    In 1993, the US Fish and Wildlife Service (USFWS) entered into an interagency agreement with the Department of Energy (DOE) to conduct specific biological surveys to identify potential impacts of the proposed geothermal development on the natural resources of the East Rift Zone. This report presents information from published literature information and new field data on seabird populations on the island of Hawaii. These data are analyzed with regard to potential impacts of geothermal development on seabird populations in this area. Fifteen species of seabirds, waterbirds, and shorebirds are documented or suspected of being found using habitats within or immediately adjacent to the three geothermal subzones located in the Puna district on the island of Hawai`i. Of these species, two are on the federal Endangered Species List, three are on the State of Hawaii Endangered Species List, and all 15 are protected by the federal Migratory Bird Act.

  2. Microbiological Monitoring in Geothermal Plants

    Science.gov (United States)

    Alawi, M.; Lerm, S.; Linder, R.; Vetter, A.; Vieth-Hillebrand, A.; Miethling-Graff, R.; Seibt, A.; Wolfgramm, M.; Wuerdemann, H.

    2010-12-01

    In the scope of the research projects “AquiScreen” and “MiProTherm” we investigated geothermally used groundwater systems under microbial, geochemical, mineralogical and petrological aspects. On one side an enhanced process understanding of engineered geothermal systems is mandatory to optimize plant reliability and economy, on the other side this study provides insights into the microbiology of terrestrial thermal systems. Geothermal systems located in the North German Basin and the Molasse Basin were analyzed by sampling of fluids and solid phases. The investigated sites were characterized by different temperatures, salinities and potential microbial substrates. The microbial population was monitored by the use of genetic fingerprinting techniques and PCR-cloning based on PCR-amplified 16S rRNA and dissimilatory sulfite reductase (DSR) genes. DNA-sequences of fingerprints and cloned PCR-products were compared to public databases and correlated with metabolic classes to provide information about the biogeochemical processes. In all investigated geothermal plants, covering a temperature range from 5° to 120°C, microorganisms were found. Phylogenetic gene analyses indicate a broad diversity of microorganisms adapted to the specific conditions in the engineered system. Beside characterized bacteria like Thermus scotoductus, Siderooxidans lithoautotrophicus and the archaeon Methanothermobacter thermoautotrophicus a high number of so far uncultivated microorganisms was detected. As it is known that - in addition to abiotic factors - microbes like sulfate-reducing bacteria (SRB) are involved in the processes of corrosion and scaling in plant components, we identified SRB by specific analyses of DSR genes. The SRB detected are closely related to thermotolerant and thermophilic species of Desulfotomaculum, Thermodesulfovibrio, Desulfohalobium and Thermodesulfobacterium, respectively. Overall, the detection of microbes known to be involved in biocorrosion and the

  3. The deep geothermal energy project in Lavey (VD), Switzerland. Phase B1: killer criteria analysis; Projet de geothermie profonde a Lavey (VD). Phase B1: analyse de criteres killer - Rapport final

    Energy Technology Data Exchange (ETDEWEB)

    Bianchetti, G. [Alpgeo Sarl, Sierre (Switzerland); Kane, M. [Enef Tech Innovation SA, Lausanne (Switzerland); Graf, O. [Energie solaire SA, Sierre (Switzerland); Rikli, J. -P. [JPR Concept und Innovation, Uster (Switzerland); Reinhardt, F. [Services industriels, Lausanne (Switzerland); Hofmann, F. [Ecotec Environnement SA, Geneve (Switzerland); Sonney, R.; Vuataz, F. [Centre de Recherche en Geothermie (CREGE), Neuchatel (Switzerland); Richoz, J. -P. [Hydro-Concept Sarl, Yverdon (Switzerland); Storelli, S. [Centre de Recherches Energetiques et Municipales (CREM), Martigny (Switzerland)

    2007-07-01

    This report belongs to the AGEPP project (Alpine Geothermal Power Production) the goal of which is to demonstrate the feasibility of power generation from deep geothermal aquifers in the Alpine Crystalline. A preliminary study (completed by June 2006) identified two promising sites in the Swiss Rhone River valley. For the next step the site of Lavey was selected. The local hydrological conditions are already known (there is a spa in Lavey) and the regional heat demand is large enough to justify the construction of a district heating network. The present report is a part of the technical feasibility study and is devoted to the verification of the absence of any obstacle which would kill the project. The following aspects were investigated: deep water collection and return to the Rhone River; power generation; useful heat delivery; legal aspects, communication and financing. It was concluded that the only risks of the project are the unknown properties of the deep aquifer (water temperature, flow rate, exact location) and possible technical digging difficulties that would increase the project cost.

  4. Geopressured-geothermal energy development: government incentives and institutional structures

    Energy Technology Data Exchange (ETDEWEB)

    Frederick, D.O.; Prestwood, D.C.L.; Roberts, K.; Vanston, J.H. Jr.

    1979-01-01

    The following subjects are included: a geothermal resource overview, the evolution of the current Texas geopressured-geothermal institutional structure, project evaluation with uncertainty and the structure of incentives, the natural gas industry, the electric utility industry, potential governmental participants in resource development, industrial users of thermal energy, current government incentives bearing on geopressured-geothermal development, six profiles for utilization of the geopressured-geothermal resources in the mid-term, and probable impacts of new government incentives on mid-term resource utilization profiles. (MHR)

  5. Pueblo of Jemez Geothermal Feasibility Study Fianl Report

    Energy Technology Data Exchange (ETDEWEB)

    S.A. Kelley; N. Rogers; S. Sandberg; J. Witcher; J. Whittier

    2005-03-31

    This project assessed the feasibility of developing geothermal energy on the Pueblo of Jemez, with particular attention to the Red Rocks area. Geologic mapping of the Red Rocks area was done at a scale of 1:6000 and geophysical surveys identified a potential drilling target at a depth of 420 feet. The most feasible business identified to use geothermal energy on the reservation was a greenhouse growing culinary and medicinal herbs. Space heating and a spa were identified as two other likely uses of geothermal energy at Jemez Pueblo. Further geophysical surveys are needed to identify the depth to the Madera Limestone, the most likely host for a major geothermal reservoir.

  6. INVAP and its project management capabilities: a key to company success

    International Nuclear Information System (INIS)

    Salvatore, Marcelo; Delgado, Ricardo; Niklison, Carlos; Ordonez, Juan Pablo; Gerbino, Juan Jose Gil

    2002-01-01

    Over the past 26 years, several factors have contributed to INVAP's projection into domestic and overseas operations. Of these, the most recognized is of course the technological capabilities INVAP keeps developing to satisfy our customer's requirements. In a second thought, the other factor is the strategic objective of providing specific purpose customer oriented solutions. The less obvious third important factor in this trilogy is the successful application of Project Management techniques and methods. INVAP's vision on Project Management encompasses well known concepts as: Integrated Management, Proactive solutions, Cost Control and Reporting, Quality Assurance, Target Schedules, Performance Requirements, Risk Management, Configuration Management and Integrated Logistic Support. After 2 years of execution of the Replacement Research Reactor Project for the Australian Nuclear Science and Technology Organization, our Project Management methodology have allowed us to timely meet all project milestones, complete basic and detail engineering, timely deliver the preliminary safety reports, manufacture and test technological concepts in specifically built mock ups and overcome risky situations -like the economical panorama in Argentina- without jeopardizing our Contractual commitments. Present paper depicts the practical approach INVAP has for Project Management -particularly within the Nuclear Division-, and a description of the tools to such aim developed. (author)

  7. Feasibility of using geothermal effluents for waterfowl wetlands

    Energy Technology Data Exchange (ETDEWEB)

    None

    1981-09-01

    This project was conducted to evaluate the feasibility of using geothermal effluents for developing and maintaining waterfowl wetlands. Information in the document pertains to a seven State area the West where geothermal resources have development potential. Information is included on physiochemical characteristics of geothermal effluents; known effects of constituents in the water on a wetland ecosystem and water quality criteria for maintaining a viable wetland; potential of sites for wetland development and disposal of effluent water from geothermal facilities; methods of disposal of effluents, including advantages of each method and associated costs; legal and institutional constraints which could affect geothermal wetland development; potential problems associated with depletion of geothermal resources and subsidence of wetland areas; potential interference (adverse and beneficial) of wetlands with ground water; special considerations for wetlands requirements including size, flows, and potential water usage; and final conclusions and recommendations for suitable sites for developing demonstration wetlands.

  8. Present status of geothermal power development in Kyushu; Kyushu ni okeru chinetsu hatsuden no genjo

    Energy Technology Data Exchange (ETDEWEB)

    Akiyoshi, M. [Kyushu Electric Power Co. Inc., Fukuoka (Japan)

    1997-10-20

    The present situation was introduced of the geothermal power generation in Kyushu. In Kyushu, where there are lots of volcanos and abundant geothermal resources, the geothermal exploration has been made since long ago. Three non-utility use units at three geothermal power generation points and six commercial use units at five points are now in operation in Kyushu. The total output is approximately 210 MW, about 40% of the domestic geothermal power generation. At Otake and Hacchobaru geothermal power plants, the Kyushu Electric Power Company made the geothermal resource exploration through the installation/operation of power generation facilities. At the Otake power plant, a geothermal water type single flashing system was adopted first in the country because of its steam mixed with geothermal water. At the Hacchobaru power plant, adopted were a two-phase flow transportation system and a double flashing system in which the geothermal water separated from primary steam by separator is more reduced in pressure to take out secondary steam. Yamakawa, Ogiri and Takigami power plants are all for the joint exploration. Geothermal developers drill steam wells and generate steam, and the Kyushu Electric Power Company buys the steam and uses it for power generation. 5 figs., 1 tab.

  9. Retrospective examination of geothermal environmental assessments

    Energy Technology Data Exchange (ETDEWEB)

    Webb, J.W.; Eddlemon, G.K.; Reed, A.W.

    1984-03-01

    Since 1976, the Department of Energy (DOE) has supported a variety of programs and projects dealing with the exploration, development, and utilization of geothermal energy. This report presents an overview of the environmental impacts associated with these efforts. Impacts that were predicted in the environmental analyses prepared for the programs and projects are reviewed and summarized, along with measures that were recommended to mitigate these impacts. Also, for those projects that have gone forward, actual impacts and implemented mitigation measures are reported, based on telephone interviews with DOE and project personnel. An accident involving spills of geothermal fluids was the major environmental concern associated with geothermal development. Other important considerations included noise from drilling and production, emissions of H/sub 2/S and cooling tower drift, disposal of solid waste (e.g., from H/sub 2/S control), and the cumulative effects of geothermal development on land use and ecosystems. Mitigation measures were frequently recommended and implemented in conjunction with noise reduction; drift elimination; reduction of fugitive dust, erosion, and sedimentation; blowout prevention; and retention of wastes and spills. Monitoring to resolve uncertainties was often implemented to detect induced seismicity and subsidence, noise, drift deposition, concentrations of air and water pollutants, and effects on groundwater. The document contains an appendix, based on these findings, which outlines major environmental concerns, mitigation measures, and monitoring requirements associated with geothermal energy. Sources of information on various potential impacts are also listed.

  10. ) The Application of Remote Sensing to Exploration and Production Projects in Shell Petroleum Development Company for Effective Environmental Management

    International Nuclear Information System (INIS)

    Mpaka, O.E.

    2003-01-01

    Over the years (especially within the last decade) environmental issues have assumed a proportion that the oil industry appeared unprepared for. The oil industry has not been immune from the consequences of the awareness generated by various interest groups world-wide. Environmental Assessment has become an integral part of all projects in Shell Development Company [SPDC] and the remote sensing tool has shown to be vital for effective management of the environment. The Niger Delta operations area covers approximately 70.0002km, an area including mangrove swamps, extensive forest and agricultural development, and most SPDC onshore operations are carried out in this fragile environment. Project citing in this environment requires careful planning and articulation of environmentally friendly and cost effective routes and sites. The implementation of satellite image processing and analysis, using georeferenced multispectral imagery have provided information on vegetation and other land cover types, topography including drainage, and infrastructure. The derived information is used for planning new well locations; flowlines and location access routes; impact assessment and monitoring of the environment. This article discusses how the environment is better managed by applying the remote sensing technology in each project embarked upon in SPDC. Some of he projects discussed include: Forcados CCP, Oluwa-Ore and Awoba-Soku-Bonny gasline routes/site investigation and selection projects Oben, Uzere/Oroni Field Development Planning ;3D Ovio Seismic prospect planning ;Obigbo Pipeline squatter mapping

  11. Basic survey project for Joint Implementation, etc. for energy conservation in ethylene production at Yangzi Petrochemical Company

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a potential study was conducted of energy conservation in Yangzi Petrochemical Company in Nanking City, China. The project is aimed at realizing energy conservation and reduction in greenhouse effect gas emissions by generating power by installation of gas turbine and by using waste gas as fuel for ethylene cracking furnace. In the project, the following are carried out: introduction of 35MW gas turbine generator, and repairs of fuel burner of ethylene cracking furnace, fuel gas compressor of gas turbine, emergency use air blower, duct, etc. The construction work is to be done in 30 months from April, 2005. The initial investment is approximately 45 million US$. The energy conservation to be brought by this project is 37,958 tons/year, or 759,160 tons in the total project term. Further, the reduction amount of greenhouse effect gas emissions is 117,452 CO2 tons/year, or 2,349,040 CO2 tons in the total project term. (NEDO)

  12. 2016 Geothermal Technologies Office Annual Report

    Energy Technology Data Exchange (ETDEWEB)

    None, None

    2017-03-01

    This report highlights project successes and continued efforts in all of our program areas – EGS, Hydrothermal, Low-Temperature, and Systems Analysis – which are flanked by useful tools and resources and links to more information. Such highlights include FORGE and EGS successes, projects reducing geothermal costs and risks, and advancements in technology research and development.

  13. Subsurface temperatures and geothermal gradients on the North Slope, Alaska

    Science.gov (United States)

    Collett, Timothy S.; Bird, Kenneth J.; Magoon, Leslie B.

    1989-01-01

    Geothermal gradients as interpreted from a series of high-resolution stabilized well-bore-temperature surveys from 46 North Slope, Alaska, wells vary laterally and vertically throughout the near-surface sediment (0-2,000 m). The data from these surveys have been used in conjunction with depths of ice-bearing permafrost, as interpreted from 102 well logs, to project geothermal gradients within and below the ice-bearing permafrost sequence. The geothermal gradients calculated from the projected temperature profiles are similar to the geothermal gradients measured in the temperature surveys. Measured and projected geothermal gradients in the ice-bearing permafrost sequence range from 1.5??C/100m in the Prudhoe Bay area to 5.1??C/100m in the National Petroleum Reserve in Alaska (NPRA).

  14. The impact of leadership styles on project success: Case of a telecommunications company

    Directory of Open Access Journals (Sweden)

    Tammy Lategan

    2015-06-01

    Full Text Available Challenges within the customer service industry make leadership styles a key factor in the success of customer service project delivery. This research provides an overview of information and knowledge within a corporate environment with an underlying theme of defining leadership styles within the customer service projects environment to ensure successful project delivery. This research aims to investigate the perception of leadership styles required and factors that contribute to successful project delivery effectiveness within a telecommunication customer service environment. A conceptual research model is formulated and is followed by a quantitative research process and analysis. The results of the study identified that employees had a neutral perception to leadership styles however; different leadership styles are important to themselves and the organisation

  15. Numerical investigation of the efficiency of emission reduction and heat extraction in a sedimentary geothermal reservoir: a case study of the Daming geothermal field in China.

    Science.gov (United States)

    Guo, Xuyang; Song, Hongqing; Killough, John; Du, Li; Sun, Pengguang

    2018-02-01

    The utilization of geothermal energy is clean and has great potential worldwide, and it is important to utilize geothermal energy in a sustainable manner. Mathematical modeling studies of geothermal reservoirs are important as they evaluate and quantify the complex multi-physical effects in geothermal reservoirs. However, previous modeling efforts lack the study focusing on the emission reduction efficiency and the deformation at geothermal wellbores caused by geothermal water extraction/circulation. Emission efficiency is rather relevant in geothermal projects introduced in areas characterized by elevated air pollution where the utilization of geothermal energy is as an alternative to burning fossil fuels. Deformation at geothermal wellbores is also relevant as significant deformation caused by water extraction can lead to geothermal wellbore instability and can consequently decrease the effectiveness of the heat extraction process in geothermal wells. In this study, the efficiency of emission reduction and heat extraction in a sedimentary geothermal reservoir in Daming County, China, are numerically investigated based on a coupled multi-physical model. Relationships between the efficiency of emission reduction and heat extraction, deformation at geothermal well locations, and geothermal field parameters including well spacing, heat production rate, re-injection temperature, rock stiffness, and geothermal well placement patterns are analyzed. Results show that, although large heat production rates and low re-injection temperatures can lead to decreased heat production in the last 8 years of heat extraction, they still improve the overall heat production capacity and emission reduction capacity. Also, the emission reduction capacity is positively correlated with the heat production capacity. Deformation at geothermal wellbore locations is alleviated by smaller well spacing, lower heat production rates, and smaller numbers of injectors in the well pattern, and by

  16. Geothermal development of the Salton Trough, California and Mexico

    Energy Technology Data Exchange (ETDEWEB)

    Palmer, T.D.; Howard, J.H.; Lande, D.P. (eds.)

    1975-04-01

    A geological description is given of the Salton Trought followed by a chronological history of attempts to exploit the area's geothermal resources. In addition, detailed descriptions are given of all ongoing geothermal projects in the area and the organizations conducting them.

  17. Phase 1 archaeological investigation, cultural resources survey, Hawaii Geothermal Project, Makawao and Hana districts, south shore of Maui, Hawaii

    Energy Technology Data Exchange (ETDEWEB)

    Erkelens, C. [International Archaeological Research Inst., Inc., Honolulu, HI (United States)

    1995-04-01

    This report details the archaeological investigation of a 200 foot wide sample corridor extending approximately 9 miles along the southern portion of Maui within the present districts of Hana and Makawao. The survey team documented a total of 51 archaeological sites encompassing 233 surface features. Archaeological sites are abundant throughout the region and only become scarce where vegetation has been bulldozed for ranching activities. At the sea-land transition points for the underwater transmission cable, both Ahihi Bay and Huakini Bay are subjected to seasonal erosion and redeposition of their boulder shorelines. The corridor at the Ahihi Bay transition point runs through the Maonakala Village Complex which is an archaeological site on the State Register of Historic Places within a State Natural Area Reserve. Numerous other potentially significant archaeological sites lie within the project corridor. It is likely that rerouting of the corridor in an attempt to avoid known sites would result in other undocumented sites located outside the sample corridor being impacted. Given the distribution of archaeological sites, there is no alternative route that can be suggested that is likely to avoid encountering sites. Twelve charcoal samples were obtained for potential taxon identification and radiocarbon analysis. Four of these samples were subsequently submitted for dating and species identification. Bird bones from various locations within a lava tube were collected for identification. Sediment samples for subsequent pollen analysis were obtained from within two lava tubes. With these three sources of information it is hoped that paleoenvironmental data can be recovered that will enable a better understanding of the setting for Hawaiian habitation of the area.

  18. Geothermal Program Review XVII: proceedings. Building on 25 years of Geothermal Partnership with Industry

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1999-10-01

    The US Department of Energy's Office (DOE) of Geothermal Technologies conducted its annual Program Review XVII in Berkeley, California, on May 18--20, 1999. The theme this year was "Building on 25 Years of Geothermal Partnership with Industry". In 1974, Congress enacted Public Law 93-410 which sanctioned the Geothermal Energy Coordination and Management Project, the Federal Government's initial partnering with the US geothermal industry. The annual program review provides a forum to foster this federal partnership with the US geothermal industry through the presentation of DOE-funded research papers from leaders in the field, speakers who are prominent in the industry, topical panel discussions and workshops, planning sessions, and the opportunity to exchange ideas. Speakers and researchers from both industry and DOE presented an annual update on research in progress, discussed changes in the environment and deregulated energy market, and exchanged ideas to refine the DOE Strategic Plan for research and development of geothermal resources in the new century. A panel discussion on Climate Change and environmental issues and regulations provided insight into the opportunities and challenges that geothermal project developers encounter. This year, a pilot peer review process was integrated with the program review. A team of geothermal industry experts were asked to evaluate the research in progress that was presented. The evaluation was based on the Government Performance and Results Act (GPRA) criteria and the goals and objectives of the Geothermal Program as set forth in the Strategic Plan. Despite the short timeframe and cursory guidance provided to both the principle investigators and the peer reviewers, the pilot process was successful. Based on post review comments by both presenters and reviewers, the process will be refined for next year's program review.

  19. Geothermal energy worldwide

    International Nuclear Information System (INIS)

    Barbier, Enriko

    1997-01-01

    Geothermal energy, as a natural steam and hot water, has been exploited for decades in order to generate electricity as well as district heating and industrial processes. The present geothermal electrical installed capacity in the world is about 10.000 MWe and the thermal capacity in non-electrical uses is about 8.200 MWt. Electricity is produced with an efficiency of 10-17%, and the cost of the kWh is competitive with conventional energy sources. In the developing countries, where a total installed electrical power is still low, geothermal energy can play a significant role: in El Salvador, for example, 25% of electricity comes from geothermal spring, 20% in the Philippines and 8% in Kenya. Present technology makes it possible to control the environmental impact of geothermal exploitation. Geothermal energy could also be extracted from deep geopressured reservoirs in large sedimentary basins, hot dry rock systems and magma bodies. (author)

  20. GEOTHERMAL GREENHOUSING IN TURKEY

    Directory of Open Access Journals (Sweden)

    Sedat Karaman

    2016-07-01

    Full Text Available Use of renewable energy resources should be brought forward to reduce heating costs of greenhouses and to minimize the use of ever-depleting fossil fuels. Geothermal energy not only provides the heat required throughout plant growth, but also allow a year-long production. Geothermal resources with several other benefits therefore play significant role in agricultural activities. With regard to geothermal potential and implementation, Turkey has the 7th place in the world and the 1st place in Europe. Majority of country geothermal resources is used in greenhouse heating. The size of geothermal greenhouses increased 5 folds during the last decade and reached to 2500 decare. In this study, current status of geothermal greenhousing of Turkey was presented; problems and possible solutions were discussed.

  1. Success in geothermal development

    International Nuclear Information System (INIS)

    Stefansson, V.

    1992-01-01

    Success in geothermal development can be defined as the ability to produce geothermal energy at compatible energy prices to other energy sources. Drilling comprises usually the largest cost in geothermal development, and the results of drilling is largely influencing the final price of geothermal energy. For 20 geothermal fields with operating power plants, the ratio between installed capacity and the total number of well in the field is 1.9 MWe/well. The drilling history in 30 geothermal fields are analyzed by plotting the average cumulative well outputs as function of the number of wells drilled in the field. The range of the average well output is 1-10 MWe/well with the mean value 4.2 MWe/well for the 30 geothermal fields studied. A leaning curve is defined as the number of wells drilled in each field before the average output per well reaches a fairly constant value, which is characteristic for the geothermal reservoir. The range for this learning time is 4-36 wells and the average is 13 wells. In general, the average well output in a given field is fairly constant after some 10-20 wells has been drilled in the field. The asymptotic average well output is considered to be a reservoir parameter when it is normalized to the average drilling depth. In average, this reservoir parameter can be expressed as 3.3 MWe per drilled km for the 30 geothermal fields studied. The lifetime of the resource or the depletion time of the geothermal reservoir should also be considered as a parameter influencing the success of geothermal development. Stepwise development, where the reservoir response to the utilization for the first step is used to determine the timing of the installment of the next step, is considered to be an appropriate method to minimize the risk for over investment in a geothermal field

  2. Exploitation and Utilization of Oilfield Geothermal Resources in China

    OpenAIRE

    Shejiao Wang; Jiahong Yan; Feng Li; Junwen Hu; Kewen Li

    2016-01-01

    Geothermal energy is a clean, green renewable resource, which can be utilized for power generation, heating, cooling, and could effectively replace oil, gas, and coal. In recent years, oil companies have put more efforts into exploiting and utilizing geothermal energy with advanced technologies for heat-tracing oil gathering and transportation, central heating, etc., which has not only reduced resource waste, but also improved large-scale and industrial resource utilization levels, and has ac...

  3. OUT Success Stories: Chemical Treatments for Geothermal Brines

    International Nuclear Information System (INIS)

    Burr, R.

    2000-01-01

    DOE research helped develop the large, untapped geothermal resource beneath the Salton Sea in California's Imperial Valley. The very hot brines under high pressure make them excellent for electric power production. The brines are very corrosive and contain high concentrations of dissolved silica. DOE worked with San Diego Gas and Electric Company to find a solution to the silica-scaling problem. This innovative brine treatment eliminated scaling and made possible the development of the Salton Sea geothermal resource

  4. Geothermal Progress Monitor. Report No. 18

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-12-31

    The near-term challenges of the US geothermal industry and its long-range potential are dominant themes in this issue of the US Department of Energy (DOE) Geothermal Progress Monitor which summarizes calendar-year 1996 events in geothermal development. Competition is seen as an antidote to current problems and a cornerstone of the future. Thus, industry's cost-cutting strategies needed to increase the competitiveness of geothermal energy in world markets are examined. For example, a major challenge facing the US industry today is that the sales contracts of independent producers have reached, or soon will, the critical stage when the prices utilities must pay them drop precipitously, aptly called the cliff. However, Thomas R. Mason, President and CEO of CalEnergy told the DOE 1996 Geothermal Program Review XIV audience that while some of his company's plants have ''gone over the cliff, the world is not coming to an end.'' With the imposition of severe cost-cutting strategies, he said, ''these plants remain profitable... although they have to be run with fewer people and less availability.'' The Technology Development section of the newsletter discusses enhancements to TOUGH2, the general purpose fluid and heat flow simulator and the analysis of drill cores from The Geysers, but the emphasis is on advanced drilling technologies.

  5. An inventory control project in a major Danish company using compound renewal demand models

    DEFF Research Database (Denmark)

    Larsen, Christian; Seiding, Claus Hoe; Teller, Christian

    operation is highly automated. However, the procedures for estimating demands and the policies for the inventory control system that were in use at the beginning of the project did not fully match the sophisticated technological standard of the physical system. During the initial phase of the project...... We describe the development of a framework to compute the optimal inventory policy for a large spare-parts' distribution centre operation in the RA division of the Danfoss Group in Denmark. The RA division distributes spare parts worldwide for cooling and A/C systems. The warehouse logistics...

  6. Geothermal Power Technologies

    DEFF Research Database (Denmark)

    Montagud, Maria E. Mondejar; Chamorro, C.R.

    2017-01-01

    Although geothermal energy has been widely deployed for direct use in locations with especial geologic manifestations, its potential for power generation has been traditionally underestimated. Recent technology developments in drilling techniques and power conversion technologies from low......-temperature heat resources are bringing geothermal energy to the spotlight as a renewable baseload energy option for a sustainable energy mix. Although the environmental impact and economic viability of geothermal exploitation must be carefully evaluated for each case, the use of deep low-temperature geothermal...... reservoirs could soon become an important contributor to the energy generation around the world....

  7. Geothermal reservoir engineering

    CERN Document Server

    Grant, Malcolm Alister

    2011-01-01

    As nations alike struggle to diversify and secure their power portfolios, geothermal energy, the essentially limitless heat emanating from the earth itself, is being harnessed at an unprecedented rate.  For the last 25 years, engineers around the world tasked with taming this raw power have used Geothermal Reservoir Engineering as both a training manual and a professional reference.  This long-awaited second edition of Geothermal Reservoir Engineering is a practical guide to the issues and tasks geothermal engineers encounter in the course of their daily jobs. The bo

  8. Geothermal Energy Program overview

    International Nuclear Information System (INIS)

    1991-12-01

    The mission of the Geothermal Energy Program is to develop the science and technology necessary for tapping our nation's tremendous heat energy sources contained with the Earth. Geothermal energy is a domestic energy source that can produce clean, reliable, cost- effective heat and electricity for our nation's energy needs. Geothermal energy -- the heat of the Earth -- is one of our nation's most abundant energy resources. In fact, geothermal energy represents nearly 40% of the total US energy resource base and already provides an important contribution to our nation's energy needs. Geothermal energy systems can provide clean, reliable, cost-effective energy for our nation's industries, businesses, and homes in the form of heat and electricity. The US Department of Energy's (DOE) Geothermal Energy Program sponsors research aimed at developing the science and technology necessary for utilizing this resource more fully. Geothermal energy originates from the Earth's interior. The hottest fluids and rocks at accessible depths are associated with recent volcanic activity in the western states. In some places, heat comes to the surface as natural hot water or steam, which have been used since prehistoric times for cooking and bathing. Today, wells convey the heat from deep in the Earth to electric generators, factories, farms, and homes. The competitiveness of power generation with lower quality hydrothermal fluids, geopressured brines, hot dry rock, and magma ( the four types of geothermal energy) still depends on the technical advancements sought by DOE's Geothermal Energy Program

  9. Texas geothermal R D and D program planning support document. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Davis, R.J.; Conover, M.F.; Keeney, R.C.; Personett, M.L.; Richmann, D.L.

    1981-08-28

    Program planning support was provided by; developing a geothermal RD and D program structure, characterizing the status of geothermal RD and D through review of literature and interaction with the geothermal research community, developing a candidate list of future Texas geothermal projects, and prioritizing the candidate projects based on appropriate evaluation criteria. The method used to perform this study and the results thereof are presented. Summary reviews of selected completed and ongoing projects and summary descriptions and evaluations of the candidate RD and D projects ar provided. A brief discussion emerging federal RD and D policies is presented. References and independent project rankings by three of the GRP members are included. (MHR)

  10. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Science.gov (United States)

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  11. Comparing private label and manufacturer brand innovation projects in a Dutch food processing company

    NARCIS (Netherlands)

    Omta, S.W.F.; Fortuin, F.T.J.M.

    2014-01-01

    The time when private labels consisted only of low-priced, low-quality products has long gone. A new type of cooperative innovation project has emerged in which food processors and retailers work closely together to target consumers with new and innovative products. These so-called high-end private

  12. Innovation in project-based companies - A case study in different approaches to organisational change

    DEFF Research Database (Denmark)

    Grex, Sara

    2004-01-01

    This paper asks how project-based organizations can be developed in order to establish and sustain innovation. The question is being explored by examining and comparing two approaches to organizational change. One approach emphasizes planning, regulation and control and creation of changes through...

  13. Project for the adaptation of the Instituto Nacional de Investigaciones Nucleares (ININ) to work as companies incubator, and the business plan as support device in the achievement of successful base technological companies

    International Nuclear Information System (INIS)

    Rubio A, C.R.

    1996-01-01

    The purpose of this project is to study an option to reduce technology dependence by taking advantage of the technology based companies generated by the organisms called 'Companies Incubators'. The first point given, is an introduction about incubation applied to national companies and the experiences had about them. There are also suggested some indicators which can be used to develop the incubator tasks. Once it has been defined the topic about incubation in the country, it is provided information about the items determining the company performance within an incubator. In order to do this, it is shown the way the Instituto Nacional de Investigaciones Nucleares can provide not only its facilities but also qualified personnel working for them. Thus it is given a scheme along with a brief organization description and key personnel for the incubator, stating the functions and responsibilities per each one of the persons who are part of the project direction and leading. The bases for the incubator are stated, as well as the requirements to start-up a company being supported by a company incubator. The key points to have a succesful development for the incubator are: the service it can give as well as the guidelines for companies entrance, which are classified into two sorts of customers, external and internal. It is also included a market research about the main product derived from creating a company incubator, as well as the sub-products, the market area, this is directed to the people who will benefit from it, the supply and demand involved with ININ. The main tool used was Business Plan, which defines its importance within the organization and activities guide, it is also included the Business Plan structure

  14. Lithium Isotopes in Geothermal Fluids from Iceland

    Science.gov (United States)

    Millot, R.; Asmundsson, R.; Sanjuan, B.

    2008-12-01

    One of the main objectives of the HITI project (HIgh Temperature Instruments for supercritical geothermal reservoir characterization and exploitation), partially funded by the European Union, is to develop methods to characterize the reservoir and fluids of deep and very high temperature geothermal systems. The chemical composition of geothermal waters in terms of major and trace elements is related to the temperature, the degree of water/rock interaction and the mineralogical assemblage of the bedrock. Traditional geothermometers, such as silica, Na-K, Na-K-Ca or K-Mg applied to geothermal waters, make it possible to estimate the temperature at depth of the reservoir from which the waters are derived. However, the values estimated for deep temperature are not always concordant. The chemical geothermometer Na/Li which presents the singularity of associating two chemical elements, one a major element (sodium) and the other a trace element (Li), can be also used and gives an additional temperature estimation. The primary objective of this work was to better understand the behavior of this last geothermometer using the isotopic systematics of Li in order to apply it at very high temperature Icelandic geothermal systems. One particularly important aspect was to establish the nature, extent and mechanism of Li isotope fractionation between 100 and 350°C during water/rock interaction. For that purpose, we measured Li isotopes of about 25 geothermal waters from Iceland by using a Neptune MC-ICP-MS that enabled the analysis of Li isotopic ratios in geothermal waters with a level of precision of ±0.5‰ (2 standard deviations) on quantities of 10-50 ng of Li. Geothermal waters from Reykjanes, Svartsengi, Nesjavellir, Hveragerdi, Namafjall and Krafla geothermal systems were studied and particular emphasis was placed on the characterization of the behavior of Li isotopes in this volcanic context at high temperature with or without the presence of seawater during water

  15. ''Geothermal Energy Allgaeu 2.0''. Project for the exploration of an improvement of deep geothermal systems in Allgaeu; ''Geothermie Allgaeu 2.0''. Projekt zur Erforschung einer Verbesserung von tiefengeothermischen Systemen im Allgaeu

    Energy Technology Data Exchange (ETDEWEB)

    Kreuter, Horst; Schrage, Christina; Volland, Sabine [GeoThermal Engineering GmbH, Karlsruhe (Germany); Bems, Curd; Hild, Stephan [Exorka GmbH, Gruenwald/Geiselgasteig (Germany)

    2011-10-24

    Based on a joint research project for the geothermal exploration of deep reservoir of the Malm limestone in the Allgaeu region (western Molasse) water flow paths are to be improved by developing a petrothermal system in a carbonate horizon. In 2008, in Mauerstetten (Federal Republic of Germany) the first bore hole was sunk for the hydrothermal development of the Malm. Geological and technical problems forced the relocation of the drilling compared with the initial planning. Since the drilling in this area turned out unsuccessful, the lower part of the borehole was abandoned. Over a sidetrack the original target horizon of the upper Malm is achieved. After various tests, the well proved dry and was abandoned. As part of a joint research project it will be attempted over the next two years to create a heat exchange area by means of the petrothermal technology. The results can be applied to other locations in the molasses with the Upper Malm reservoir.

  16. Energy saving projects in two steel companies in Fushun City, China

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2001-03-01

    With an objective of saving energy and reducing greenhouse gas emission, investigations and discussions were given on two steel making companies in China. Discussions were given for Fushun Special Steel Co., Ltd. on abolishment and unification of four electric furnaces into two new electric furnaces, and for Fushun New Steel Co., Ltd. on installation of a granulation reinforcing facility, a segregation reinforcing device, and cooler waste heat recovery boilers for the sintering machine, installation of sensors including the waste gas oxygen concentration meter, adoption of a process computer, and optimization of the furnace temperature patterns for the heating furnace. As a result of the discussions, it was revealed that the unit requirement for electric power used at Fushun Special Steel can be reduced largely, and so can the fuel used at Fushun New Steel. The annual energy saving effect would be about 500 million yen relative to the investment amount of 2.8 billion yen at Fushun Special Steel, and about 400 million yen relative to the investment amount of about 400 million yen at Fushun New Steel. The greenhouse gas emission would be reduced annually by 40,000 t-CO2 and 60,000 t-CO2 respectively. Fushun Special Steel will execute an international bid in May this year. (NEDO)

  17. Projected role of advanced computational aerodynamic methods at the Lockheed-Georgia company

    Science.gov (United States)

    Lores, M. E.

    1978-01-01

    Experience with advanced computational methods being used at the Lockheed-Georgia Company to aid in the evaluation and design of new and modified aircraft indicates that large and specialized computers will be needed to make advanced three-dimensional viscous aerodynamic computations practical. The Numerical Aerodynamic Simulation Facility should be used to provide a tool for designing better aerospace vehicles while at the same time reducing development costs by performing computations using Navier-Stokes equations solution algorithms and permitting less sophisticated but nevertheless complex calculations to be made efficiently. Configuration definition procedures and data output formats can probably best be defined in cooperation with industry, therefore, the computer should handle many remote terminals efficiently. The capability of transferring data to and from other computers needs to be provided. Because of the significant amount of input and output associated with 3-D viscous flow calculations and because of the exceedingly fast computation speed envisioned for the computer, special attention should be paid to providing rapid, diversified, and efficient input and output.

  18. Evolution of the U.S. energy service company industry: Market size and project performance from 1990–2008

    International Nuclear Information System (INIS)

    Larsen, Peter H.; Goldman, Charles A.; Satchwell, Andrew

    2012-01-01

    The U.S. energy service company (ESCO) industry is an example of a private sector business model where energy savings are delivered to customers primarily through the use of performance-based contracts. This study was conceived as a snapshot of the ESCO industry prior to the economic slowdown and the introduction of federal stimulus funding mandated by enactment of the American Recovery and Reinvestment Act of 2009 (ARRA). This study utilizes two parallel analytic approaches to characterize ESCO industry and market trends in the U.S.: (1) a “top-down” approach involving a survey of individual ESCOs to estimate aggregate industry activity and (2) a “bottom-up” analysis of a database of ∼3250 projects (representing over $8B in project investment) that reports market trends including installed EE retrofit strategies, project installation costs and savings, project payback times, and benefit-cost ratios over time. Despite the onset of a severe economic recession, the U.S. ESCO industry managed to grow at about 7% per year between 2006 and 2008. ESCO industry revenues were about $4.1 billion in 2008 and ESCOs anticipate accelerated growth through 2011 (25% per year). We found that 2484 ESCO projects in our database generated ∼$4.0 billion ($2009) in net, direct economic benefits to their customers. We estimate that the ESCO project database includes about 20% of all U.S. ESCO market activity from 1990–2008. Assuming the net benefits per project are comparable for ESCO projects that are not included in the LBNL database, this would suggest that the ESCO industry has generated ∼$23 billion in net direct economic benefits for customers at projects installed between 1990 and 2008. There is empirical evidence confirming that the industry is evolving by installing more comprehensive and complex measures—including onsite generation and measures to address deferred maintenance—but this evolution has significant implications for customer project economics

  19. Exploration strategy for high temperature geothermal resources in the Philippines - an update

    International Nuclear Information System (INIS)

    Bayrante, L.F.; Ferrer, H.P.; Barnett, P.R.

    1992-01-01

    After nearly two decades of geoscientific-exploration at 45 geothermal areas in the Philippines, the Philippine National Oil Company-Energy Development Corporation (PNOC-EDC) has developed a multi-disciplinary approach for exploring country's geothermal resources. It suitability for crater-hosted magmatic geothermal systems is currently being evaluated in the light of new data from six recently drilled prospects. New techniques are under consideration for future exploration programmes. (auth.). 59 refs.; 5 figs

  20. Help guide for setting up photovoltaic projects born by agricultural companies and farmers

    International Nuclear Information System (INIS)

    2010-01-01

    After a brief recall of energy production and consumption challenges in France, and a brief presentation of photovoltaic energy production connected to the distribution network in urban settings, this document describes the arrangements which aim at supporting this production by introducing purchase tariffs. Eligibility criteria and the different tariff levels are presented. They depend on the type of building and on the level of integration of the production module. Then, after having highlighted the reasons to invest in such projects, the document specify technical prerequisites (building orientation, roof slope angle, shadow effect plotting, module technologies, connection technical and economic feasibility), how to carry the project to a successful conclusion (internal communication, urban planning approaches, engineering consultancy, relationship with financiers, administrative aspects). It also comments the various aspects of the technical-economic analysis (photovoltaic system choice and installation, maintenance, insurance, connection to the network), the law and tax issues (roof renting, taxes), and the operation. Four examples are briefly presented

  1. Cummins Engine Company B5.9 Propane Engine Development, Certification, and Demonstration Project

    Energy Technology Data Exchange (ETDEWEB)

    The ADEPT Group, Inc. (Los Angeles, California)

    1998-12-18

    The objective of this project was to successfuly develop and certify an LPG-dedicated medium-duty original equipment manufacturer (OEM) engine that could be put into production. The engine was launched into production in 1994, and more than 800 B5.9G engines are now in service in the United States and abroad. This engine is now offered by more than 30 bus and truck OEMs.

  2. The Marketplace Variables in Successful and Unsuccessful NPD Projects in Technology Intensive Companies

    OpenAIRE

    Haverila, Matti

    2010-01-01

    We present an exploratory investigation of how managers conceptualize and perceive ‘marketplace’ variables in successful and unsuccessful New Product Development (NPD) projects, and explore the role that marketplace variables play in differentiating between successful and unsuccessful NPD outcomes. Limitations and future research directions are also discussed. Our findings indicate that managers perceive the marketplace in multiple ways during the NPD process and also that differences exis...

  3. Geothermal Today: 2003 Geothermal Technologies Program Highlights (Revised)

    Energy Technology Data Exchange (ETDEWEB)

    2004-05-01

    This outreach publication highlights milestones and accomplishments of the DOE Geothermal Technologies Program for 2003. Included in this publication are discussions of geothermal fundamentals, enhanced geothermal systems, direct-use applications, geothermal potential in Idaho, coating technology, energy conversion R&D, and the GeoPowering the West initiative.

  4. Fiscal 1980 Sunshine Project research report. International cooperation project for energy technology. International research cooperation for geothermal energy (Japan-U.S. R and D cooperation for geothermal resource assessment); 1980 nendo energy gijutsu kokusai kyoryoku jigyo chinetsu energy kokusai kyoryoku seika hokokusho. Chinetsu shigen hyoka ni kansuru Nichibei kenkyu kaihatsu kyoryoku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    Based on the Japan-U.S. agreement on promotion of geothermal energy applications, the R and D cooperation specialist panel was held in America on March 12-20, 1981 to exchange the current R and D information on geothermal resources. It was clarified through the meeting in Department of Energy (DOE) that the U.S. budget was reduced by the Reagan Administration largely, resulting in delays in development of geothermal energy and construction of geothermal power plants. The following themes were discussed: Japanese and American geothermal development programs, DOE's industrialization activity, hot dry rock program, geoscience program, and geothermal prospecting technology program. It was clarified through the meeting in U.S. Geological Survey (USGS) that since the governmental resource assessment is made by USGS, however, wide data collection is made by other organizations generally, acquisition of data required for the assessment is difficult. Study on MOU is necessary together with fund allocation. Field survey was also made in Raft River, Cove Fort and Roosevelt. (NEDO)

  5. Fiscal 1980 Sunshine Project research report. International cooperation project for energy technology. International research cooperation for geothermal energy (Japan-U.S. R and D cooperation for geothermal resource assessment); 1980 nendo energy gijutsu kokusai kyoryoku jigyo chinetsu energy kokusai kyoryoku seika hokokusho. Chinetsu shigen hyoka ni kansuru Nichibei kenkyu kaihatsu kyoryoku

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    Based on the Japan-U.S. agreement on promotion of geothermal energy applications, the R and D cooperation specialist panel was held in America on March 12-20, 1981 to exchange the current R and D information on geothermal resources. It was clarified through the meeting in Department of Energy (DOE) that the U.S. budget was reduced by the Reagan Administration largely, resulting in delays in development of geothermal energy and construction of geothermal power plants. The following themes were discussed: Japanese and American geothermal development programs, DOE's industrialization activity, hot dry rock program, geoscience program, and geothermal prospecting technology program. It was clarified through the meeting in U.S. Geological Survey (USGS) that since the governmental resource assessment is made by USGS, however, wide data collection is made by other organizations generally, acquisition of data required for the assessment is difficult. Study on MOU is necessary together with fund allocation. Field survey was also made in Raft River, Cove Fort and Roosevelt. (NEDO)

  6. Geothermal energy for greenhouses

    Science.gov (United States)

    Jacky Friedman

    2009-01-01

    Geothermal energy is heat (thermal) derived from the earth (geo). The heat flows along a geothermal gradient from the center of the earth to the surface. Most of the heat arrives at the surface of the earth at temperatures too low for much use. However, plate tectonics ensure that some of the heat is concentrated at temperatures and depths favorable for its commercial...

  7. Prospects of geothermal energy

    International Nuclear Information System (INIS)

    Manzella, A.; Bianchi, A.

    2008-01-01

    Geothermal energy has great potential as a renewable energy with low environmental impact, the use of heat pumps is becoming established in Italy but the national contributions are still modest when compared to other nations. Mature technologies could double the installed geothermal power in Italy at 2020. [it

  8. Geothermal Program Review XIV: proceedings. Keeping Geothermal Energy Competitive in Foreign and Domestic Markets

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1996-01-01

    The U.S. Department of Energy`s Office of Geothermal Technologies conducted its annual Program Review XIV in Berkeley, April 8-10, 1996. The geothermal community came together for an in-depth review of the federally-sponsored geothermal research and development program. This year`s theme focused on ``Keeping Geothermal Energy Competitive in Foreign and Domestic Markets.`` This annual conference is designed to promote technology transfer by bringing together DOE-sponsored researchers; utility representatives; geothermal developers; equipment and service suppliers; representatives from local, state, and federal agencies; and others with an interest in geothermal energy. Program Review XIV consisted of eight sessions chaired by industry representatives. Introductory and overview remarks were presented during every session followed by detailed reports on specific DOE-funded research projects. The progress of R&D projects over the past year and plans for future activities were discussed. The government-industry partnership continues to strengthen -- its success, achievements over the past twenty years, and its future direction were highlighted throughout the conference. The comments received from the conference evaluation forms are published in this year`s proceedings. Individual papers have been processed for inclusion in the Energy Science and Technology Database.

  9. Occidental Geothermal, Inc. , Oxy Geothermal Power Plant No. 1: draft environmental impact report

    Energy Technology Data Exchange (ETDEWEB)

    1981-08-01

    The following aspects of the proposed geothermal power plant are discussed: the project description; the environment in the vicinity of project as it exists before the project begins, from both a local and regional perspective; the adverse consequences of the project, any significant environmental effects which cannot be avoided, and any mitigation measures to minimize significant effects; the potential feasible alternatives to the proposed project; the significant unavoidable, irreversible, and long-term environmental impacts; and the growth inducing impacts. (MHR)

  10. Economic Effectiveness Evaluation In Projects Consisting In Automating Settlement Systems. The Example Of A Financial Centre Of An Internationa l Automotive Company

    OpenAIRE

    Miroslaw Dyczkowski

    2010-01-01

    Economic effectiveness has become a decisive factor in feasibility studies for IT projects due to deteriorating economic situation. This paper characterises such an assessment on the example of an automated settlement system for a supply chain. The described project was carried out by a financial centre – located in Poland – of an in ternational company operating in the automotive industry. It aimed at applying EDI technologies to automate logistics. The project...

  11. Surveys of distribution and abundance of the Hawaiian hawk within the vicinity of proposed geothermal project subzones in the District of Puna, Hawaii. Final report

    Energy Technology Data Exchange (ETDEWEB)

    Reynolds, M.; Ritchotte, G.; Viggiano, A.; Dwyer, J.; Nielsen, B.; Jacobi, J.D. [Fish and Wildlife Service, Hawaii National Park, HI (United States). Hawaii Research Station

    1994-08-01

    In 1993, the US Fish and Wildlife Service (USFWS) entered an interagency agreement with the Department of Energy (DOE) to conduct specific biological surveys to identify potential impacts of proposed geothermal development on the biota of the east rift zone of Kilauea volcano in the Puna district on the island of Hawaii. This report presents data on the distribution, habitat use, and density of the Hawaiian hawk or `Io (Buteo solitarius). Data were collected by the USFWS to assess the potential impacts of geothermal development on `Io populations on the island of Hawaii. These impacts include degradation of potential nesting habitat and increased disturbance due to construction and operation activities. Data from these surveys were analyzed as part of an island wide population assessment conducted by the Western Foundation of Vertebrate Zoology at the request of the USFWS.

  12. New Mexico State University campus geothermal demonstration project: an engineering construction design and economic evaluation. Final technical report, February 25, 1980-April 24, 1981

    Energy Technology Data Exchange (ETDEWEB)

    Cunniff, R.A.; Ferguson, E.; Archey, J.

    1981-07-01

    A detailed engineering construction cost estimate and economic evaluation of low temperature geothermal energy application for the New Mexico State University Campus are provided. Included are results from controlled experiments to acquire design data, design calculations and parameters, detailed cost estimates, and a comprehensive cost and benefit analysis. Detailed designs are given for a system using 140 to 145{sup 0}F geothermal water to displace 79 billion Btu per year of natural gas now being burned to generate steam. This savings represents a displacement of 44 to 46 percent of NMSU central plant natural gas consumption, or 32 to 35 percent of total NMSU natural gas consumption. The report forms the basis for the system construction phase with work scheduled to commence in July 1981, and target on-stream data of February 1982.

  13. Geothermal country update of Japan

    International Nuclear Information System (INIS)

    Higo, M.

    1990-01-01

    This paper reports on the status of geothermal energy in Japan. Topics covered include: present and planned production of electricity, present utilization of geothermal energy for direct heat, information about geothermal localities, and wells drilled for electrical utilization of geothermal resources to January 1, 1990

  14. Geothermal energy: a brief assessment

    Energy Technology Data Exchange (ETDEWEB)

    Lunis, B.C.; Blackett, R.; Foley, D. (eds.)

    1982-07-01

    This document includes discussions about geothermal energy, its applications, and how it is found and developed. It identifies known geothermal resources located in Western's power marketing area, and covers the use of geothermal energy for both electric power generation and direct applications. Economic, institutional, environmental, and other factors are discussed, and the benefits of the geothermal energy resource are described.

  15. Basic survey project for Joint Implementation, etc. Blast furnace top pressure recovery turbine (TRT) project (Panzhihua Iron and Steel (Group) Company, People's Republic of China)

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2000-03-01

    For the purpose of reducing greenhouse effect gas emissions, a feasibility study was conducted on the energy conservation at Panzhihua Iron and Steel Company in Sichuan Province, China. In this project, the pressure energy of blast furnace is to be recovered in the form of electric power by installing the blast furnace top pressure recovery turbine (TRT). In the project, the pressure-reducing valve was removed, and the dry dust collector/dry TRT were installed to make the scale of electric power production largest. A model of TRT was installed at No. 4 blast furnace and is now in operation. In this project, TRTs are to be installed at Nos. 1, 2 and 3 blast furnaces. As a result of the study, the investment totaled 5.46 billion yen. The capacity of power generation by TRT is 16,890 kW, and the generated output is 137,822 MWh/y. Moreover, the amount of energy conservation is 36,467 toe/y, and the reduction amount of greenhouse effect gas emissions is 112,830 CO2-ton/y. The term of investment recovery is 8.3 years. The effect of reduction in greenhouse effect gas emissions is 20.66 CO2-ton/y/million yen. (NEDO)

  16. Advanced Geothermal Turbodrill

    Energy Technology Data Exchange (ETDEWEB)

    W. C. Maurer

    2000-05-01

    Approximately 50% of the cost of a new geothermal power plant is in the wells that must be drilled. Compared to the majority of oil and gas wells, geothermal wells are more difficult and costly to drill for several reasons. First, most U.S. geothermal resources consist of hot, hard crystalline rock formations which drill much slower than the relatively soft sedimentary formations associated with most oil and gas production. Second, high downhole temperatures can greatly shorten equipment life or preclude the use of some technologies altogether. Third, producing viable levels of electricity from geothermal fields requires the use of large diameter bores and a high degree of fluid communication, both of which increase drilling and completion costs. Optimizing fluid communication often requires creation of a directional well to intersect the best and largest number of fracture capable of producing hot geothermal fluids. Moineau motor stators made with elastomers cannot operate at geothermal temperatures, so they are limited to the upper portion of the hole. To overcome these limitations, Maurer Engineering Inc. (MEI) has developed a turbodrill that does not use elastomers and therefore can operate at geothermal temperatures. This new turbodrill uses a special gear assembly to reduce the output speed, thus allowing a larger range of bit types, especially tri-cone roller bits, which are the bits of choice for drilling hard crystalline formations. The Advanced Geothermal Turbodrill (AGT) represents a significant improvement for drilling geothermal wells and has the potential to significantly reduce drilling costs while increasing production, thereby making geothermal energy less expensive and better able to compete with fossil fuels. The final field test of the AGT will prepare the tool for successful commercialization.

  17. STRATEGIC PURCHASING IN A PROJECT- BASED COMPANY – TO CENTRALIZE OR DECENTRALIZE

    Directory of Open Access Journals (Sweden)

    Eva Donociková

    2014-03-01

    Full Text Available Organizations all lie on a spectrum, at one end of which are firms with complete centralization of purchasing, and at the other end are firms with complete decentralization. Most firms lie somewhere between the two extremes, and we have already mentioned the most common model that has certain decisions centralized (perhaps strategy design, selection of suppliers, purchasing of major capital equipment, training, co-ordination, communications, etc. and bulk of purchasing devolved to local buyers. There are many variations on the type of activities that are either centralized or decentralized. In the last 12 years purchasing has noticed two radical changes in the majority of facilities. First change was the reverse of supplier – customer relationships where the role of purchasers changed from persuading and begging the suppliers to ever deliver, preferably with minimum delay (for fixed prices, to standard purchase activities where the purchaser can choose from many suppliers and negotiate prices with vendors to achieve the best conditions for his buyer. The second change was the establishing of a modern IT system that made purchasing activities more effective, more automatic and transparent to a considerable extent. It is good to realize whether all changes have led to improvement or whether these changes have caused a stop or a slowdown of the project purchasing – whether it is possible or even necessary to take into account global as well as local suppliers or to combine them. This Case Study demonstrates how a project - managed organization could look like, where it is necessary to take into account customer´s wishes and benefit.

  18. Protocol for Addressing Induced Seismicity Associated with Enhanced Geothermal Systems

    Energy Technology Data Exchange (ETDEWEB)

    Majer, Ernie [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States); Nelson, James [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States); Robertson-Tait, Ann [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States); Savy, Jean [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States); Wong, Ivan [Office of Energy Efficiency and Renewable Energy (EERE), Washington, DC (United States)

    2012-01-01

    This Protocol is a living guidance document for geothermal developers, public officials, regulators and the general public that provides a set of general guidelines detailing useful steps to evaluate and manage the effects of induced seismicity related to EGS projects.

  19. Geothermal energy in Idaho: site data base and development status

    Energy Technology Data Exchange (ETDEWEB)

    McClain, D.W.

    1979-07-01

    Detailed site specific data regarding the commercialization potential of the proven, potential, and inferred geothermal resource areas in Idaho are presented. To assess the potential for geothermal resource development in Idaho, several kinds of data were obtained. These include information regarding institutional procedures for geothermal development, logistical procedures for utilization, energy needs and forecasted demands, and resource data. Area reports, data sheets, and scenarios were prepared that described possible geothermal development at individual sites. In preparing development projections, the objective was to base them on actual market potential, forecasted growth, and known or inferred resource conditions. To the extent possible, power-on-line dates and energy utilization estimates are realistic projections of the first events. Commercialization projections were based on the assumption that an aggressive development program will prove sufficient known and inferred resources to accomplish the projected event. This report is an estimate of probable energy developable under an aggressive exploration program and is considered extremely conservative. (MHR)

  20. Environmental impacts during geothermal development: Some examples from Central America

    International Nuclear Information System (INIS)

    Goff, S.; Goff, F.

    1997-01-01

    The impacts of geothermal development projects are usually positive. However, without appropriate monitoring plans and mitigation actions firmly incorporated into the project planning process, there exists the potential for significant negative environmental impacts. The authors present five examples from Central America of environmental impacts associated with geothermal development activities. These brief case studies describe landslide hazards, waste brine disposal, hydrothermal explosions, and air quality issues. Improved Environmental Impact Assessments are needed to assist the developing nations of the region to judiciously address the environmental consequences associated with geothermal development

  1. RiverHeath: Neighborhood Loop Geothermal Exchange System

    Energy Technology Data Exchange (ETDEWEB)

    Geall, Mark [RiverHeath LLC, Appleton, WI (United States)

    2016-07-11

    The goal of the RiverHeath project is to develop a geothermal exchange system at lower capital infrastructure cost than current geothermal exchange systems. The RiverHeath system features an innovative design that incorporates use of the adjacent river through river-based heat exchange plates. The flowing water provides a tremendous amount of heat transfer. As a result, the installation cost of this geothermal exchange system is lower than more traditional vertical bore systems. Many urban areas are located along rivers and other waterways. RiverHeath will serve as a template for other projects adjacent to the water.

  2. Geothermal district heating in Turkey: The Gonen case study

    International Nuclear Information System (INIS)

    Oktay, Zuhal; Aslan, Asiye

    2007-01-01

    The status of geothermal district heating in Turkey and its future prospects are reviewed. A description is given of the Gonen project in Balikesir province, the first system to begin citywide operation in the country. The geology and geothermal resources of the area, the history of the project's development, the problems encountered, its economic aspects and environmental contributions are all discussed. The results of this and other such systems installed in Turkey have confirmed that, in this country, heating an entire city based on geothermal energy is a significantly cleaner, cheaper option than using fossil fuels or other renewable energy resources. (author)

  3. El Paso Electric Company Diablo Substation to the US-Mexico border 115kV transmission line project. Final Environmental Assessment

    Energy Technology Data Exchange (ETDEWEB)

    1992-04-01

    This Environmental Assessment documents the analysis of alternative corridors for development and operation of a proposed 115 kilovolt transmission line using private lands and transporting power to the US-Mexico international border. The project will require (1) an amendment to El Paso Electric Company`s existing export authorization to transfer power across this border, and (2) a Presidential Permit for construction of the transmission line. The project would be located in Dona Ana county in southern New Mexico, approximately five miles west of El Paso, Texas. The alternative corridors, specific locations within those corridors, and structure types are identified and analyzed in the environmental studies.

  4. Geothermal progress monitor: Report No. 17

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1995-12-01

    DOE is particularly concerned with reducing the costs of geothermal power generation, especially with the abundant moderate to low-temperature resources in the US. This concern is reflected in DOE`s support of a number of energy conversion projects. Projects which focus on the costs and performance of binary cycle technology include a commercial demonstration of supersaturated turbine expansions, which earlier studies have indicated could increase the power produced per pound of fluid. Other binary cycle projects include evaluations of the performance of various working fluid mixtures and the development and testing of advanced heat rejection systems which are desperately needed in water-short geothermal areas. DOE is also investigating the applicability of flash steam technology to low-temperature resources, as an economic alternative to binary cycle systems. A low-cost, low-pressure steam turbine, selected for a grant, will be constructed to utilize fluid discharged from a flash steam plant in Nevada. Another project addresses the efficiency of high-temperature flash plants with a demonstration of the performance of the Biphase turbine which may increase the power output of such installations with no increase in fluid flow. Perhaps the most noteworthy feature of this issue of the GPM, the 17th since its inception in 1980, is the high degree of industry participation in federally-sponsored geothermal research and development. This report describes geothermal development activities.

  5. Population analysis relative to geothermal energy development, Imperial County, California

    Energy Technology Data Exchange (ETDEWEB)

    Pick, J.B.; Jung, T.H.; Butler, E.

    1977-01-01

    The historical and current population characteristics of Imperial County, California, are examined. These include vital rates, urbanization, town sizes, labor force composition, income, utility usage, and ethnic composition. Inferences are drawn on some of the important social and economic processes. Multivariate statistical analysis is used to study present relationships between variables. Population projections for the County were performed under historical, standard, and geothermal projection assumptions. The transferability of methods and results to other geothermal regions anticipating energy development is shown. (MHR)

  6. Direct use applications of geothermal resources at Desert Hot Springs, California. Final report, May 23, 1977--July 31, 1978. Volume II: appendixes

    Energy Technology Data Exchange (ETDEWEB)

    Christiansen, C.C.

    1978-07-01

    The following appendixes are included: Desert Hot Springs (DHS) Geothermal Project Advisory Board, Geothermal Citizens Advisory Committee, community needs assessment, geothermal resource characterization, a detailed discussion of the geothermal applications considered for DHS, space/water heating, agricultural operations, detailed analysis of a geothermal aquaculture facility, detailed discussion of proposed energy cascading systems for DHS, regulatory requirements, environmental impact assessment, resource management plan, and geothermal resources property rights and powers of cities to regulate indigenous geothermal resources and to finance construction of facilities for utilization of such resources. (MHR)

  7. Multi-usages of the Ilan geothermal field, NE Taiwan

    Science.gov (United States)

    Lee, C. S.; Tseng, P.; Wang, S.; Chang, C.

    2017-12-01

    The tectonics of Taiwan is very dynamic. The area produces more than 30,000 earthquakes/year; the mountains uplift 4-5 cm/year; the rainfall culminates 3,000 mm/year; there are some 4,000 hot spring operators. One of the two hot geothermal areas is located in NE Taiwan - the Ilan geothermal field. In order to develop the geothermal energy for the electricity need, the Ministry of Science and Technology have provided the fund to drill two 2,500 deep wells. The results are not so encourage for the need of an Enhanced Geothermal System. However, one of the wells has a bottom temperature of 160oC and the water up loading with 60 ton/hr. This can be combined with the near-by wells drilled by the private drilling company and the Cardinal Tien Junior College of Healthcare and Management to develop the multi-usages of the geothermal energy, such as 1 MW of electricity for the college and village, the long-term healthcare and hot spring medicare, aquaculture and agriculture need etc. The universities and private drilling company cooperate together to join the development. Hope this will provide a new model for the need of a self-sufficient community. The geothermal is a clean, renewable, and no pollution energy. Taiwan is in an initial stage of using this green energy.

  8. MeProRisk - a Joint Venture for Minimizing Risk in Geothermal Reservoir Development

    Science.gov (United States)

    Clauser, C.; Marquart, G.

    2009-12-01

    Exploration and development of geothermal reservoirs for the generation of electric energy involves high engineering and economic risks due to the need for 3-D geophysical surface surveys and deep boreholes. The MeProRisk project provides a strategy guideline for reducing these risks by combining cross-disciplinary information from different specialists: Scientists from three German universities and two private companies contribute with new methods in seismic modeling and interpretation, numerical reservoir simulation, estimation of petrophysical parameters, and 3-D visualization. The approach chosen in MeProRisk consists in considering prospecting and developing of geothermal reservoirs as an iterative process. A first conceptual model for fluid flow and heat transport simulation can be developed based on limited available initial information on geology and rock properties. In the next step, additional data is incorporated which is based on (a) new seismic interpretation methods designed for delineating fracture systems, (b) statistical studies on large numbers of rock samples for estimating reliable rock parameters, (c) in situ estimates of the hydraulic conductivity tensor. This results in a continuous refinement of the reservoir model where inverse modelling of fluid flow and heat transport allows infering the uncertainty and resolution of the model at each iteration step. This finally yields a calibrated reservoir model which may be used to direct further exploration by optimizing additional borehole locations, estimate the uncertainty of key operational and economic parameters, and optimize the long-term operation of a geothermal resrvoir.

  9. Pacific Northwest geothermal 1977 review - 1978 outlook

    Energy Technology Data Exchange (ETDEWEB)

    Youngquist, W

    1978-06-01

    A survey covers some of the more important geothermal exploration and development activity in Oregon, Washington, and Idaho in 1977, including a projection of what may be expected in these areas in 1978 and the Pacific Northwest extensive young volcanic terrain as a prime exploration target; continuing investment by the geothermal industry; and recommendations that access should be provided to public lands which hold much of this resource, that it should be recognized that the hydrologic systems which bring this energy to the well bore in economic quantities can be depleted, and that taxation should account for this depletion.

  10. GEOTHERM programme supports geothermal energy world-wide. Geothermal energy, a chance for East African countries; GEOTHERM: BGR foerdert weltweit Nutzung geothermischer Energie. Geothermie - eine Chance fuer ostafrikanische Laender

    Energy Technology Data Exchange (ETDEWEB)

    Kraml, M.; Kessels, K.; Kalberkamp, U.; Ochmann, N.; Stadtler, C. [Bundesanstalt fuer Geowissenschaften und Rohstoffe (BGR), Hannover (Germany)

    2007-02-15

    The high geothermal potential of East Africa, especially of the Eastern Rift, is known for a long time. Since these pioneer studies, geothermal plants have been constructed at three sites in East Africa. Nevertheless, up to now geothermal has been a success story only in Kenya. The steam power plant Olkaria I in Kenya is running reliability since 25 years. Today, the country produces more than 12% of its electricity from geothermal. Now, Eritrea, Djibouti, Uganda, Tanzania and Ethiopia which are also situated along the East African Rift, are planning similar projects. The countries need to develop new energy sources because oil prices have reached a critical level. In the past, hydro power was regarded to be a reliable source of energy, but increased droughts changed the situation. Thus, the african states are searching for alternatives to be able to stabilise their energy supply and to cover the growing energy demand. There is much hope that the success of the Kenyan geothermal power plants will be repeated in the neighbouring countries. The East African countries have joined their forces to give impetus to the use of the regional geothermal resources. On behalf of the Federal Ministry for Economic Cooperation and Development, the Federal Institute for Geosciences and Natural Resources supports the countries in realising their plans as part of the GEOTHERM Programme. Together with further donors (Iceland, France, USA, Global Environment Facility) the path will be paved for geothermal power plants in the above mentioned six East African countries. The following main steps are necessary: - Awareness raising of political decision makers about the advantages of including geothermal into the national power plans - Improvement of knowledge about potentials geothermal sites - Development of a regional equipment pool including the necessary geophysical equipment, laboratories, etc. - Training in geothermal exploration and plant maintenance, to minimise risks of site

  11. Exploitation and Utilization of Oilfield Geothermal Resources in China

    Directory of Open Access Journals (Sweden)

    Shejiao Wang

    2016-09-01

    Full Text Available Geothermal energy is a clean, green renewable resource, which can be utilized for power generation, heating, cooling, and could effectively replace oil, gas, and coal. In recent years, oil companies have put more efforts into exploiting and utilizing geothermal energy with advanced technologies for heat-tracing oil gathering and transportation, central heating, etc., which has not only reduced resource waste, but also improved large-scale and industrial resource utilization levels, and has achieved remarkable economic and social benefits. Based on the analysis of oilfield geothermal energy development status, resource potential, and exploitation and utilization modes, the advantages and disadvantages of harnessing oilfield geothermal resource have been discussed. Oilfield geothermal energy exploitation and utilization have advantages in resources, technical personnel, technology, and a large number of abandoned wells that could be reconstructed and utilized. Due to the high heat demand in oilfields, geothermal energy exploitation and utilization can effectively replace oil, gas, coal, and other fossil fuels, and has bright prospects. The key factors limiting oilfield geothermal energy exploitation and utilization are also pointed out in this paper, including immature technologies, lack of overall planning, lack of standards in resource assessment, and economic assessment, lack of incentive policies, etc.

  12. Federal Geothermal Research Program Update Fiscal Year 1998

    Energy Technology Data Exchange (ETDEWEB)

    Keller, J.G.

    1999-05-01

    This report reviews the specific objectives, status, and accomplishments of DOE's Geothermal Research Program for Fiscal Year 1998. The Exploration Technology research area focuses on developing instruments and techniques to discover hidden hydrothermal systems and to expose the deep portions of known systems. The Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal and hot dry rock reservoirs. The Drilling Technology projects focus on developing improved, economic drilling and completion technology for geothermal wells. The Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Direct use research covers the direct use of geothermal energy sources for applications in other than electrical production.

  13. Guidelines for Provision and Interchange of Geothermal Data Assets

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2014-07-03

    The US Department of Energy Office of Geothermal Technologies (OGT) is funding and overseeing the development of the National Geothermal Data System (NGDS), a distributed information system providing access to integrated data in support of, and generated in, all phases of geothermal development. NGDS is being built in an open paradigm and will employ state-of-the-art informatics approaches and capabilities to advance the state of geothermal knowledge in the US. This document presents guidelines related to provision and interchange of data assets in the context of the National Geothermal Data System. It identifies general specifications for NGDS catalog metadata and data content, and provides specific instructions for preparation and submission of data assets by OGT-funded projects.

  14. Use of a Geothermal-Solar Hybrid Power Plant to Mitigate Declines in Geothermal Resource Productivity

    Energy Technology Data Exchange (ETDEWEB)

    Dan Wendt; Greg Mines

    2014-09-01

    Many, if not all, geothermal resources are subject to decreasing productivity manifested in the form of decreasing brine temperature, flow rate, or both during the life span of the associated power generation project. The impacts of resource productivity decline on power plant performance can be significant; a reduction in heat input to a power plant not only decreases the thermal energy available for conversion to electrical power, but also adversely impacts the power plant conversion efficiency. The reduction in power generation is directly correlated to a reduction in revenues from power sales. Further, projects with Power Purchase Agreement (PPA) contracts in place may be subject to significant economic penalties if power generation falls below the default level specified. A potential solution to restoring the performance of a power plant operating from a declining productivity geothermal resource involves the use of solar thermal energy to restore the thermal input to the geothermal power plant. There are numerous technical merits associated with a renewable geothermal-solar hybrid plant in which the two heat sources share a common power block. The geo-solar hybrid plant could provide a better match to typical electrical power demand profiles than a stand-alone geothermal plant. The hybrid plant could also eliminate the stand-alone concentrated solar power plant thermal storage requirement for operation during times of low or no solar insolation. This paper identifies hybrid plant configurations and economic conditions for which solar thermal retrofit of a geothermal power plant could improve project economics. The net present value of the concentrated solar thermal retrofit of an air-cooled binary geothermal plant is presented as functions of both solar collector array cost and electricity sales price.

  15. Project of law modified by the Senate relative to the electric and gas public utilities and to the electric and gas companies

    International Nuclear Information System (INIS)

    2004-07-01

    This project of law aims to adapt the electricity and gas sector to the new economical context of opening of the energy markets to competition. It gives to energy companies the internal organization base necessary to warrant a high level of service and a transparent and non-discriminatory access of third parties to transport and distribution networks. These evolutions will allow Electricite de France (EdF) and Gaz de France (GdF) companies to compete on equal terms with their European competitors. It confirms first the prime role of public utility of both companies and then transposes the dispositions of the European directives relative to the organization of EdF and GdF integrated companies. It foresees the creation of two daughter companies for the management of energy transport activities. The project of law foresees also the change of the status of EdF and GdF companies and the reform of the retirement pensions of the personnel. This report presents the modifications added by the Senate to the text of law adopted at first reading by the House of Commons. (J.S.)

  16. Global geothermal energy scenario

    International Nuclear Information System (INIS)

    Singh, S.K.; Singh, A.; Pandey, G.N.

    1993-01-01

    To resolve the energy crisis efforts have been made in exploring and utilizing nonconventional energy resources since last few decades. Geothermal energy is one such energy resource. Fossil fuels are the earth's energy capital like money deposited in bank years ago. The energy to build this energy came mainly from the sun. Steam geysers and hot water springs are other manifestations of geothermal energy. Most of the 17 countries that today harness geothermal energy have simply tapped such resources where they occur. (author). 8 refs., 4 tabs., 1 fig

  17. Geothermal survey handbook

    Energy Technology Data Exchange (ETDEWEB)

    1974-01-01

    The objective of this handbook is to publicize widely the nature of geothermal surveys. It covers geothermal survey planning and measurement as well as measurement of thermal conductivity. Methods for the detection of eruptive areas, the measurement of radiative heat using snowfall, the measurement of surface temperature using infrared radiation and the measurement of thermal flow are described. The book also contains information on physical detection of geothermal reservoirs, the measurement of spring wells, thermographic measurement of surface heat, irregular layer surveying, air thermographics and aerial photography. Isotope measurement techniques are included.

  18. Worldwide installed geothermal power

    International Nuclear Information System (INIS)

    Laplaige, P.

    1995-01-01

    Worldwide electric energy production data are easy to compile, according to the informations given by individual countries. On the contrary, thermal applications of geothermics are difficult to quantify due to the variety of applications and the number of countries concerned. Exhaustive informations sometimes cannot be obtained from huge countries (China, Russia..) because of data centralization problems or not exploitable data transmission. Therefore, installed power data for geothermal heat production are given for 26 countries over the 57 that have answered the International Geothermal Association questionnaire. (J.S.). 1 fig., 2 tabs., 1 photo

  19. Geothermal electricity generation

    International Nuclear Information System (INIS)

    Eliasson, E.T.

    1991-01-01

    Geothermal conversion, as discussed here, is the conversion of the heat bound within the topmost three kilometres of the upper crust of the earth into useful energy, principally electricity. The characteristics of a geothermal reservoir and its individual technical features are highly site-specific. Applications therefore must be designed to match the specific geothermal reservoir. An estimate of the electric energy potential world-wide made by the Electric Power Research Institute (United States) in 1978 and based on sustaining a continuous 30-year operation is given in the box at the right for comparison purposes only. 8 refs, 5 figs

  20. Technologies for Extracting Valuable Metals and Compounds from Geothermal Fluids

    Energy Technology Data Exchange (ETDEWEB)

    Harrison, Stephen [SIMBOL Materials

    2014-04-30

    Materials is evaluating other products with greater commercial value. Potassium Silicotitanates, zeolites and other sorbents were evaluated as potential reagents for the extraction of potassium from geothermal brines and production of potassium chloride (potash). It was found that zeolites were effective at removing potassium but the capacity of the zeolites and the form that the potassium is in does not have economic potential. Iron-silica by-product The conversion of iron-silica by-product produced during silica management operations into more valuable materials was studied at the laboratory scale. Results indicate that it is technically feasible to convert the iron-silica by-product into ferric chloride and ferric sulfate solutions which are precursors to a ferric phosphate product. However, additional work to purify the solutions is required to determine the commercial viability of this process. Conclusion Simbol Materials is in the process of designing its first commercial plant based on the technology developed to the pilot scale during this project. The investment in the commercial plant is hundreds of millions of dollars, and construction of the commercial plant will generate hundreds of jobs. Plant construction will be completed in 2016 and the first lithium products will be shipped in 2017. The plant will have a lithium carbonate equivalent production capacity of 15,000 tonnes per year. The gross revenues from the project are expected to be approximately $ 80 to 100 million annually. During this development program Simbol grew from a company of about 10 people to over 60 people today. Simbol is expected to employ more than 100 people once the plant is constructed. Simbol Materials’ business is scalable in the Imperial Valley region because there are eleven geothermal power plants already in operation, which allows Simbol to expand its business from one plant to multiple plants. Additionally, the scope of the resource is vast in terms of potential products such

  1. Use of Geothermal Energy for Aquaculture Purposes - Phase III

    Energy Technology Data Exchange (ETDEWEB)

    Johnson, W C; Smith, K C

    1981-09-01

    This project, financed by the Pacific Northwest Regional Commission (PNRC), was designed to provide information to evaluate the best methods to use for intensive aquaculture of freshwater prawns, Macrobrachium rosenbergii, using geothermal energy. The freshwater prawn is a tropical organism and is native to southeast Asia. Earlier projects at Oregon Institute of Technology have shown the feasibility of culturing this aquatic animal in geothermal water. This phase of the project was designed to investigate intensive culture of this animal as well as the advantages of growing rainbow trout, ornamental tropical fin fish, and mosquito fish, Gambusia affnis, for vector control using geothermal energy. The research data collected on the prawns was obtained from the stocking and sampling of two 0.2- ha (half-acre) ponds constructed as a part of the project. The ponds are equipped with recording monitors for temperature and flow. The geothermal energy used is the geothermal effluent from the Oregon Institute of Technology heating system. This water is of potable quality and ranges in temperature from 50 to 70oC. The geothermal water used in the ponds is controlled at 27oC, ± 2oC, by using thermostats and solenoid valves. A small building next to the ponds contains facilities for hatching larvae prawns and tanks for growing post-larvae prawns. The hatchery facility makes the project self-sustaining. The hatchery was obtained as part of an earlier PNRC project.

  2. The Main Problems in the Development of Geothermal Energy Industry in China

    Science.gov (United States)

    Yan, Jiahong; Wang, Shejiao; Li, Feng

    2017-04-01

    As early as 1980-1985, the geothermal energy research group of the Institute of Geology and Geophisics (Chinese Academy of Sciences) has proposed to pay attention to geothermal energy resources in oil fields. PetroChina began to study the geothermal energy resources in the region of Beijing-Tianjin-Hebei from 1995. Subsequently, the geothermal resources in the Huabei, Daqing and Liaohe oil regions were evaluated. The total recoverable hot water of the three oilfields reached 19.3 × 1011m3. PetroChina and Kenya have carried out geothermal energy development and utilization projects, with some relevant technical achievements.On the basis of many years' research on geothermal energy, we summarized the main problems in the formation and development of geothermal energy in China. First of all, China's geothermal resources research is still unable to meet the needs of the geothermal energy industry. Secondly, the development and utilization of geothermal energy requires multi-disciplinary cooperation. Thirdly, the development and utilization of geothermal energy needs consideration of local conditions. Finally, the development and utilization of geothermal energy resources requires the effective management of local government.

  3. Performance of deep geothermal energy systems

    Science.gov (United States)

    Manikonda, Nikhil

    Geothermal energy is an important source of clean and renewable energy. This project deals with the study of deep geothermal power plants for the generation of electricity. The design involves the extraction of heat from the Earth and its conversion into electricity. This is performed by allowing fluid deep into the Earth where it gets heated due to the surrounding rock. The fluid gets vaporized and returns to the surface in a heat pipe. Finally, the energy of the fluid is converted into electricity using turbine or organic rankine cycle (ORC). The main feature of the system is the employment of side channels to increase the amount of thermal energy extracted. A finite difference computer model is developed to solve the heat transport equation. The numerical model was employed to evaluate the performance of the design. The major goal was to optimize the output power as a function of parameters such as thermal diffusivity of the rock, depth of the main well, number and length of lateral channels. The sustainable lifetime of the system for a target output power of 2 MW has been calculated for deep geothermal systems with drilling depths of 8000 and 10000 meters, and a financial analysis has been performed to evaluate the economic feasibility of the system for a practical range of geothermal parameters. Results show promising an outlook for deep geothermal systems for practical applications.

  4. Boise geothermal injection well: Final environmental assessment

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1997-12-31

    The City of Boise, Idaho, an Idaho Municipal Corporation, is proposing to construct a well with which to inject spent geothermal water from its hot water heating system back into the geothermal aquifer. Because of a cooperative agreement between the City and the US Department of Energy to design and construct the proposed well, compliance to the National Environmental Policy Act (NEPA) is required. Therefore, this Environmental Assessment (EA) represents the analysis of the proposed project required under NEPA. The intent of this EA is to: (1) briefly describe historical uses of the Boise Geothermal Aquifer; (2) discuss the underlying reason for the proposed action; (3) describe alternatives considered, including the No Action Alternative and the Preferred Alternative; and (4) present potential environmental impacts of the proposed action and the analysis of those impacts as they apply to the respective alternatives.

  5. Boise geothermal injection well: Final environmental assessment

    International Nuclear Information System (INIS)

    1997-01-01

    The City of Boise, Idaho, an Idaho Municipal Corporation, is proposing to construct a well with which to inject spent geothermal water from its hot water heating system back into the geothermal aquifer. Because of a cooperative agreement between the City and the US Department of Energy to design and construct the proposed well, compliance to the National Environmental Policy Act (NEPA) is required. Therefore, this Environmental Assessment (EA) represents the analysis of the proposed project required under NEPA. The intent of this EA is to: (1) briefly describe historical uses of the Boise Geothermal Aquifer; (2) discuss the underlying reason for the proposed action; (3) describe alternatives considered, including the No Action Alternative and the Preferred Alternative; and (4) present potential environmental impacts of the proposed action and the analysis of those impacts as they apply to the respective alternatives

  6. Utilization of geothermal energy for drying fish products

    International Nuclear Information System (INIS)

    Arason, S.; Arnason, H.

    1992-01-01

    This paper is about industrial uses of geothermal energy for drying of fish products. Drying is an ancient method for preservation of foods, the main purpose of which is to increase the preservation time. For drying, an external source of energy is needed to extract water. In this paper an emphasis is placed on drying fish and associated processes, and how geothermal energy can be used to substitute oil or electricity. The Icelandic Fisheries Laboratories have been experimenting with different methods of drying, and several drying stations have been designed for indoor drying of fish products. Today there are more than a dozen companies in this country which are drying fish indoors using for that purpose electricity and/or geothermal energy. Further possibilities are available when fish processing plants are located in geothermal areas

  7. Geothermal progress monitor. Report No. 16

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1994-12-01

    This issue, the 16th since 1980, illustrates the potential of the liquid-dominated geothermal resource. Achievement of this potential by publicly held companies, who are required to publish financial statements, has involved the use of high-quality resources and the best available technologies or, in some instances, their own innovative modifications of existing technologies as well as a high degree of technical and management expertise. This issue also documents some effects of the new climate of utility deregulation and competition among independent power producers on the geothermal industry. The continuing importance attached to geothermal heat pumps as a preferred space conditioning technology by a number of disparate interests is illustrated by a number of articles. Magma Power Co. reported record gains in both 1993 revenues and earnings over 1992; California Energy has acquired Magma, creating the largest geothermal energy producer in the world. Owing to stagnation in USA, it was decided to focus on international markets. After the introduction, the issue has sections on: Federal beat, industry scene, financing, technology development, direct use technology, state and local, international, technology transfer, and directory.

  8. Economic Valuation of a Geothermal Production Tax Credit

    Energy Technology Data Exchange (ETDEWEB)

    Owens, B.

    2002-04-01

    The United States (U.S.) geothermal industry has a 45-year history. Early developments were centered on a geothermal resource in northern California known as The Geysers. Today, most of the geothermal power currently produced in the U.S. is generated in California and Nevada. The majority of geothermal capacity came on line during the 1980s when stable market conditions created by the Public Utility Regulatory Policies Act (PURPA) in 1978 and tax incentives worked together to create a wave of geothermal development that lasted until the early 1990s. However, by the mid-1990s, the market for new geothermal power plants began to disappear because the high power prices paid under many PURPA contracts switched to a lower price based on an avoided cost calculation that reflected the low fossil fuel-prices of the early 1990s. Today, market and non-market forces appear to be aligning once again to create an environment in which geothermal energy has the potential to play an important role in meeting the nation's energy needs. One potentially attractive incentive for the geothermal industry is the Production Tax Credit (PTC). The current PTC, which was enacted as part of the Energy Policy Act of 1992 (EPAct) (P.L. 102-486), provides an inflation-adjusted 1.5 cent per kilowatt-hour (kWh) federal tax credit for electricity produced from wind and closed-loop biomass resources. Proposed expansions would make the credit available to geothermal and solar energy projects. This report focuses on the project-level financial impacts of the proposed PTC expansion to geothermal power plants.

  9. Federal Geothermal Research Program Update Fiscal Year 2000

    Energy Technology Data Exchange (ETDEWEB)

    Renner, J.L.

    2001-08-15

    The Department of Energy's Geothermal Program serves two broad purposes: (1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and (2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermal systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research.

  10. Federal Geothermal Research Program Update Fiscal Year 2000; ANNUAL

    International Nuclear Information System (INIS)

    Renner, J.L.

    2001-01-01

    The Department of Energy's Geothermal Program serves two broad purposes: (1) to assist industry in overcoming near-term barriers by conducting cost-shared research and field verification that allows geothermal energy to compete in today's aggressive energy markets; and (2) to undertake fundamental research with potentially large economic payoffs. The four categories of work used to distinguish the research activities of the Geothermal Program during FY 2000 reflect the main components of real-world geothermal projects. These categories form the main sections of the project descriptions in this Research Update. Exploration Technology research focuses on developing instruments and techniques to discover hidden hydrothermal systems and to explore the deep portions of known systems. Research in geophysical and geochemical methods is expected to yield increased knowledge of hidden geothermal systems. Reservoir Technology research combines laboratory and analytical investigations with equipment development and field testing to establish practical tools for resource development and management for both hydrothermal reservoirs and enhanced geothermal systems. Research in various reservoir analysis techniques is generating a wide range of information that facilitates development of improved reservoir management tools. Drilling Technology focuses on developing improved, economic drilling and completion technology for geothermal wells. Ongoing research to avert lost circulation episodes in geothermal drilling is yielding positive results. Conversion Technology research focuses on reducing costs and improving binary conversion cycle efficiency, to permit greater use of the more abundant moderate-temperature geothermal resource, and on the development of materials that will improve the operating characteristics of many types of geothermal energy equipment. Increased output and improved performance of binary cycles will result from investigations in heat cycle research

  11. Geothermal Alteration of Basaltic Core from the Snake River Plain, Idaho

    OpenAIRE

    Sant, Christopher Joseph

    2012-01-01

    The Snake River Plain is located in the southern part of the state of Idaho. The eastern plain, on which this study focuses, is a trail of volcanics from the Yellowstone hotspot. Three exploratory geothermal wells were drilled on the Snake River Plain. This project analyzes basaltic core from the first well at Kimama, north of Burley, Idaho. The objectives of this project are to establish zones of geothermal alteration and analyze the potential for geothermal power production using sub-aquife...

  12. Analysis of Low-Temperature Utilization of Geothermal Resources

    Energy Technology Data Exchange (ETDEWEB)

    Anderson, Brian

    2015-06-30

    Full realization of the potential of what might be considered “low-grade” geothermal resources will require that we examine many more uses for the heat than traditional electricity generation. To demonstrate that geothermal energy truly has the potential to be a national energy source we will be designing, assessing, and evaluating innovative uses for geothermal-produced water such as hybrid biomass-geothermal cogeneration of electricity and district heating and efficiency improvements to the use of cellulosic biomass in addition to utilization of geothermal in district heating for community redevelopment projects. The objectives of this project were: 1) to perform a techno-economic analysis of the integration and utilization potential of low-temperature geothermal sources. Innovative uses of low-enthalpy geothermal water were designed and examined for their ability to offset fossil fuels and decrease CO2 emissions. 2) To perform process optimizations and economic analyses of processes that can utilize low-temperature geothermal fluids. These processes included electricity generation using biomass and district heating systems. 3) To scale up and generalize the results of three case study locations to develop a regionalized model of the utilization of low-temperature geothermal resources. A national-level, GIS-based, low-temperature geothermal resource supply model was developed and used to develop a series of national supply curves. We performed an in-depth analysis of the low-temperature geothermal resources that dominate the eastern half of the United States. The final products of this study include 17 publications, an updated version of the cost estimation software GEOPHIRES, and direct-use supply curves for low-temperature utilization of geothermal resources. The supply curves for direct use geothermal include utilization from known hydrothermal, undiscovered hydrothermal, and near-hydrothermal EGS resources and presented these results at the Stanford

  13. Geothermal Energy: Current abstracts

    Energy Technology Data Exchange (ETDEWEB)

    Ringe, A.C. (ed.)

    1988-02-01

    This bulletin announces the current worldwide information available on the technologies required for economic recovery of geothermal energy and its use as direct heat or for electric power production. (ACR)

  14. NGDC Geothermal Data Bases

    Data.gov (United States)

    National Oceanic and Atmospheric Administration, Department of Commerce — Geothermics is the study of heat generated in Earth's interior and its manifestation at the surface. The National Geophysical Data Center (NGDC) has a variety of...

  15. Geothermics in Aquitaine

    International Nuclear Information System (INIS)

    Dane, J.P.

    1995-01-01

    The geothermal exploitation of the Aquitanian Basin (S W France) started 15 years ago and has extended today to 12 different places. Three main aquifers of different depth are exploited in Bordeaux region: the old alluvial deposits of Garonne river (20-30 m), the Middle Eocene aquifer (300-400 m), and the Cenomanian-Turonian aquifer (900-1100 m) which is the deepest and most exploited for geothermal purposes. The drinkable quality of the water and the use of single-well technique are important factors that reduce the operating costs. Geothermics remains competitive with other energy sources due to the long-term stability of geothermal energy costs. (J.S.). 2 figs., 1 tab., 5 photos

  16. FINANCIAL STUDY OF AN INVESTMENT PROJECT IN ALGERIA: CREATION OF A COMPANY WITHIN THE FRAMEWORK OF THE NATIONAL FUNDSUPPORT FOR YOUTH EMPLOYMENT (FNSEJ)

    OpenAIRE

    Dr Lyes OUABDESSELAM

    2017-01-01

    This article proposes a financial study of a project to create a commercial enterprise through the scheme proposed by the National Agency for Youth Employment Support (ANSEJ). The company is a testing and analysis laboratory. In this study we have prepared a complete financial package and we have budgeted this project over the entire amortization period of the investment credit in accordance with the timetable set by the support system for young entrepreneurs to set up a business in Algeria. ...

  17. Geothermal studies in China

    Science.gov (United States)

    Ji-Yang, Wang; Mo-Xiang, Chen; Ji-An, Wang; Xiao, Deng; Jun, Wang; Hsien-Chieh, Shen; Liang-Ping, Hsiung; Shu-Zhen, Yan; Zhi-Cheng, Fan; Xiu-Wen, Liu; Ge-Shan, Huang; Wen-Ren, Zhang; Hai-Hui, Shao; Rong-Yan, Zhang

    1981-01-01

    Geothermal studies have been conducted in China continuously since the end of the 1950's with renewed activity since 1970. Three areas of research are defined: (1) fundamental theoretical research on geothermics, including subsurface temperatures, terrestrial heat flow and geothermal modeling; (2) exploration for geothermal resources and exploitation of geothermal energy; and (3) geothermal studies in mines. Regional geothermal studies have been conducted recently in North China and more than 2000 values of subsurface temperature have been obtained. Temperatures at a depth of 300 m generally range from 20 to 25°C with geothermal gradients from 20 to 40°C/km. These values are regarded as an average for the region with anomalies related to geological factors. To date, 22 reliable heat flow data from 17 sites have been obtained in North China and the data have been categorized according to fault block tectonics. The average heat flow value at 16 sites in the north is 1.3 HFU, varying from 0.7 to 1.8 HFU. It is apparent that the North China fault block is characterized by a relatively high heat flow with wide variations in magnitude compared to the mean value for similar tectonic units in other parts of the world. It is suggested that although the North China fault block can be traced back to the Archaean, the tectonic activity has been strengthening since the Mesozoic resulting in so-called "reactivation of platform" with large-scale faulting and magmatism. Geothermal resources in China are extensive; more than 2000 hot springs have been found and there are other manifestations including geysers, hydrothermal explosions, hydrothermal steam, fumaroles, high-temperature fountains, boiling springs, pools of boiling mud, etc. In addition, there are many Meso-Cenozoic sedimentary basins with widespread aquifers containing geothermal water resources in abundance. The extensive exploration and exploitation of these geothermal resources began early in the 1970's. Since then

  18. National Account Energy Alliance Final Report for the Basin Electric Project at Northern Border Pipeline Company's Compressor Station #7, North Dakota

    Energy Technology Data Exchange (ETDEWEB)

    Sweetzer, Richard [Exergy Partners Corp.; Leslie, Neil [Gas Technology Institute

    2008-02-01

    A field research test and verification project was conducted at the recovered energy generation plant at Northern Border Pipeline Company Compressor Station #7 (CS#7) near St. Anthony. Recovered energy generation plant equipment was supplied and installed by ORMAT Technologies, Inc. Basin Electric is purchasing the electricity under a purchase power agreement with an ORMAT subsidiary, which owns and operates the plant.

  19. Renewable Energy Essentials: Geothermal

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    2010-07-01

    Geothermal energy is energy available as heat contained in or discharged from the earth's crust that can be used for generating electricity and providing direct heat for numerous applications such as: space and district heating; water heating; aquaculture; horticulture; and industrial processes. In addition, the use of energy extracted from the constant temperatures of the earth at shallow depth by means of ground source heat pumps (GSHP) is also generally referred to as geothermal energy.

  20. Geothermal environmental impact

    International Nuclear Information System (INIS)

    Armannsson, H.; Kristmannsdottir, H.

    1992-01-01

    Geothermal utilization can cause surface disturbances, physical effects due to fluid withdrawal noise, thermal effects and emission of chemicals as well as affect the communities concerned socially and economically. The environmental impact can be minimized by multiple use of the energy source and the reinjection of spent fluids. The emission of greenhouse gases to the atmosphere can be substantially reduced by substituting geothermal energy for fossil fuels as an industrial energy source wherever possible

  1. Fiscal 1980 Sunshine Project research report. Development of slurry applicable to geothermal environment; 1980 nendo chinetsu kankyoka de shiyo kanona deisui no kaihatsu seika hokokusho

    Energy Technology Data Exchange (ETDEWEB)

    NONE

    1981-03-01

    This report summarizes the fiscal 1980 research result on development of slurry applicable to geothermal environment. Study was made on the hydrothermal alteration and rheology of the clay suspension slurry system composed of base mud of sepiolite (thermogel), dehydrator of sodium polyacrylate (SPA), and dispersant GT-8. The study result clarified roughly the action mechanism of such slurry under geothermal environment. Such slurry thus achieved an expected target experimentally through various tests on slurry characteristics at higher temperature, slurry curing and slurry conditioning. Test was made on the lubricity of air system drilling fluid. Simulated field test was made on a preventive effect from lost circulation by using combination of various materials. The preventive effect increased with the kind of additional preventive agents. As for waste sludge treatment technology, the agitating capacity of a mixing tank for polymer flocculant was improved. Study was made on possible continuous treatment of sludge by using the above equipment and a continuous sludge caking equipment, resulting in achievement of an expected target. (NEDO)

  2. Geothermal Risk Reduction via Geothermal/Solar Hybrid Power Plants. Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Wendt, Daniel [Idaho National Lab. (INL), Idaho Falls, ID (United States); Mines, Greg [Idaho National Lab. (INL), Idaho Falls, ID (United States); Turchi, Craig [National Renewable Energy Lab. (NREL), Golden, CO (United States); Zhu, Guangdong [National Renewable Energy Lab. (NREL), Golden, CO (United States)

    2015-11-01

    are subject to decreasing productivity manifested in the form of decreasing production fluid temperature, flow rate, or both during the life span of the associated power generation project. The impacts of geothermal production fluid temperature decline on power plant performance can be significant; a reduction in heat input to a power plant not only decreases the thermal energy available for conversion to electrical power, but also adversely impacts the power plant efficiency. The impact of resource productivity decline on power generation project economics can be equally detrimental. The reduction in power generation is directly correlated to a reduction in revenues from power sales. Further, projects with Power Purchase Agreement (PPA) contracts in place may be subject to significant economic penalties if power generation falls below a specified default level. While the magnitude of PPA penalties varies on a case-by-case basis, it is not unrealistic for these penalties to be on the order of the value of the deficit power sales such that the utility may purchase the power elsewhere. This report evaluates the use of geothermal/solar-thermal hybrid plant technology for mitigation of resource productivity decline, which has not been a primary topic of investigation in previous analyses in the open literature.

  3. A comparison of economic evaluation models as applied to geothermal energy technology

    Science.gov (United States)

    Ziman, G. M.; Rosenberg, L. S.

    1983-01-01

    Several cost estimation and financial cash flow models have been applied to a series of geothermal case studies. In order to draw conclusions about relative performance and applicability of these models to geothermal projects, the consistency of results was assessed. The model outputs of principal interest in this study were net present value, internal rate of return, or levelized breakeven price. The models used were VENVAL, a venture analysis model; the Geothermal Probabilistic Cost Model (GPC Model); the Alternative Power Systems Economic Analysis Model (APSEAM); the Geothermal Loan Guarantee Cash Flow Model (GCFM); and the GEOCOST and GEOCITY geothermal models. The case studies to which the models were applied include a geothermal reservoir at Heber, CA; a geothermal eletric power plant to be located at the Heber site; an alcohol fuels production facility to be built at Raft River, ID; and a direct-use, district heating system in Susanville, CA.

  4. Evaluation of the Geothermal Public Power Utility Workshops in California

    Energy Technology Data Exchange (ETDEWEB)

    Farhar, B. C.

    2004-10-01

    The federal government devotes significant resources to educating consumers and businesses about geothermal energy. Yet little evidence exists for defining the kinds of information needed by the various audiences with specialized needs. This paper presents the results of an evaluation of the Geothermal Municipal Utility Workshops that presented information on geothermal energy to utility resource planners at customer-owned utilities in California. The workshops were sponsored by the Western Area Power Administration and the U.S. Department of Energy's GeoPowering the West Program and were intended to qualitatively assess the information needs of municipal utilities relative to geothermal energy and get feedback for future workshops. The utility workshop participants found the geothermal workshops to be useful and effective for their purposes. An important insight from the workshops is that utilities need considerable lead-time to plan a geothermal project. They need to know whether it is better to own a project or to purchase geothermal electricity from another nonutility owner. California customer-owned utilities say they do not need to generate more electricity to meet demand, but they do need to provide more electricity from renewable resources to meet the requirements of the state's Renewable Portfolio Standard.

  5. Final report. Geothermal Energy Program: Information dissemination, public outreach, and technical analysis activities. April 1, 1999 to December 31, 2001. USDOE Grant No. DE-FG01-99-EE35098

    Energy Technology Data Exchange (ETDEWEB)

    Lund, John W.

    2002-03-22

    This is the final report of the accomplishments of the geothermal energy program: information dissemination, public outreach, and technical analysis activities by the project team consisting of the Geo-Heat Center, Geothermal Resources Council, Geothermal Education Office, Geothermal Energy Association, and the Washington State University Energy Program.

  6. Geothermal energy in Croatia and the world until 2020

    International Nuclear Information System (INIS)

    Jelic, K.; Kevric, I.; Cubric, S.

    1996-01-01

    The use of geothermal energy in watering place, heating, the production of electric power, and for other purposes is increasing throughout the world. Over the past ten years, besides traditional production from natural thermal wells, this energy has also been produced in Croatia from geothermal wells discovered as a results of deep exploration drilling for hydrocarbons. This paper analyses the current state of geothermal energy both in the world and in Croatia, and makes projections about its immediate future. Energy potential data on the croatian part of the Panonian basin are given along with perspective locations for producing this ecologically acceptable and partially reusable energy. (author)

  7. Using the geothermal resources in the power engineering of Russia

    International Nuclear Information System (INIS)

    Dobrokhotov, V.I.; Povarov, O.A.

    2003-01-01

    The areas of the geothermal heat application in various regions of Russia are considered. Expansion of applying the local nontraditional renewable sources of energy, primarily the earth geothermal heat, should be considered one of the basic directions of improving and developing the heat supply systems. Already in the nearest 7-10 years it is possible to save significant sources of organic heat due to the geothermal heat through application of the modern heat supply technologies. The proposals for organization of the financial schemes for realization of new power projects are considered by the example of the GeoPP construction on the Kamchatka [ru

  8. Environment - Geothermal, the energy to wake up - Stimulation rather than fracturing - Iceland, the Texas of geothermal energy

    International Nuclear Information System (INIS)

    Chandes, Camille; Moragues, Manuel

    2013-01-01

    A first article comments the current efforts for the development of geothermal in France after a period during which it has been given up. It evokes the project of a geothermal plant near Paris (to supply Arcueil and Gentilly with energy), the increasing number of projects in different countries. It outlines the French delay in this sector, and that geothermal energy is as difficult to find as oil. It evokes the new actors of the sector and outlines the fierce competition in front of Icelander, Italian, US and Japanese actors, and the opportunities for the French ones. A second article comments the use of the hydraulic stimulation in geothermal energy exploration rather than hydraulic fracturing as in shale gas exploration, and outlines that according to geothermal energy actors this technique avoids the risk of micro-earthquake. A last article describes the activity of the geothermal sector in Iceland: geothermal energy supplies two thirds of primary energy consumption in this country. It exploits the Icelander volcanism. This development has been particularly noticeable since 2000, but some questions are raised regarding the production potential

  9. Hot rock energy projects : Australian context

    Energy Technology Data Exchange (ETDEWEB)

    Goldstein, B.A.; Malavazos, M. [Society of Petroleum Engineers, Richardson, TX (United States); Hill, A.J.; Coda, J. [Primary Industries and Resources South Australia, Adelaide (Australia)]|[Australian Geothermal Energy Group, Adelaide (Australia); Budd, A.R.; Holgate, F.L. [Australian Geothermal Energy Group, Adelaide (Australia)]|[Geoscience Australia, Adelaide (Australia)

    2008-10-15

    The Australia Geothermal Energy Group is an alliance of companies, government agencies and research organizations with an interest in promoting geothermal energy use. Hot rocks (HR) geothermal energy is a valued addition to the portfolio of safe, secure and competitive energy supplies because it offers the potential of inexhaustible geothermal heat energy with zero emissions. Australia's vast HR resources have attracted global interest and government support for HR projects, which call upon integrated expertise from the petroleum minerals and power industries. Funding from the Australian government is aimed at reducing critical, sector-wide uncertainties and equates to nearly 25 per cent of the cost of the private sector's field efforts to date. A national HR resource assessment and a road-map for the commercialization of Australian HR plays will be published in 2008 to help in the decision making process by portfolio managers. The challenges and prospects for HR projects in Australia were presented. It has been estimated that converting only 1 per cent of Australia's crustal energy from depths of 5 km and 150 degrees C to electricity would supply 26,000 years of Australia's 2005 primary power use. The factors that distinguish Australian HR resources include abundant radioactive granites and areas of recent volcanic activity; and, Australia is converging with Indonesia on a plate scale resulting in common, naturally occurring subhorizontally fractured basement rocks that are susceptible to hydraulic fracture stimulation. Most projects are focused on HR to develop enhanced or engineered geothermal systems (EGS) to fuel binary power plants. Approximately 80 percent of these projects are located in South Australia. 14 refs., 3 tabs., 3 figs.

  10. Assessing Market Development and Innovation Project Management Factors Using the PICEA-g Hybrid Evolutionary Multi-Criteria Decision Technique. The Calcimine Company Case Study

    Directory of Open Access Journals (Sweden)

    S. Ghaffari

    2017-12-01

    Full Text Available Project management includes the consideration of complex decision modes used in modern decision support techniques. The aim of this paper was to prioritize such factors and evaluate their effects on project management and optimal control. Their effect on management and optimal project control are evaluated in frame of a statistical hypothesis. A new algorithm, "IPICEA-g" is proposed for the assessment. A questionnaire is used for data collection distributed between 56 employees of the CALCIMINE Company. T-test, two-sentence test, ANP method, FUZZY SEAMATEL and the IPICEA-g hybrid algorithm, are employed for data analyzing. Results are further discussed and conclusions are drawn.

  11. Geothermal energy developments in the district heating of Szeged

    OpenAIRE

    Osvald, Máté; Szanyi, János; Medgyes, Tamás; Kóbor, Balázs; Csanádi, Attila

    2017-01-01

    The District Heating Company of Szeged supplies heat and domestic hot water to 27,000 households and 500 public buildings in Szeged. In 2015, the company decided to introduce geothermal sources into 4 of its 23 heating circuits and started the preparation activities of the development. Preliminary investigations revealed that injection into the sandstone reservoir and the hydraulic connection with already existing wells pose the greatest hydrogeological risks, while placement and operation of...

  12. Accelerating Geothermal Research (Fact Sheet)

    Energy Technology Data Exchange (ETDEWEB)

    2014-05-01

    Geothermal research at the National Renewable Energy Laboratory (NREL) is advancing geothermal technologies to increase renewable power production. Continuous and not dependent on weather, the geothermal resource has the potential to jump to more than 500 gigawatts in electricity production, which is equivalent to roughly half of the current U.S. capacity. Enhanced geothermal systems have a broad regional distribution in the United States, allowing the potential for development in many locations across the country.

  13. Creation of an Enhanced Geothermal System through Hydraulic and Thermal Stimulation

    Energy Technology Data Exchange (ETDEWEB)

    Rose, Peter Eugene [Energy and Geoscience Institute at the University of Utah

    2013-04-15

    This report describes a 10-year DOE-funded project to design, characterize and create an Engineered Geothermal System (EGS) through a combination of hydraulic, thermal and chemical stimulation techniques. Volume 1 describes a four-year Phase 1 campaign, which focused on the east compartment of the Coso geothermal field. It includes a description of the geomechanical, geophysical, hydraulic, and geochemical studies that were conducted to characterize the reservoir in anticipation of the hydraulic stimulation experiment. Phase 1 ended prematurely when the drill bit intersected a very permeable fault zone during the redrilling of target stimulation well 34-9RD2. A hydraulic stimulation was inadvertently achieved, however, since the flow of drill mud from the well into the formation created an earthquake swarm near the wellbore that was recorded, located, analyzed and interpreted by project seismologists. Upon completion of Phase 1, the project shifted focus to a new target well, which was located within the southwest compartment of the Coso geothermal field. Volume 2 describes the Phase 2 studies on the geomechanical, geophysical, hydraulic, and geochemical aspects of the reservoir in and around target-stimulation well 46A-19RD, which is the deepest and hottest well ever drilled at Coso. Its total measured depth exceeding 12,000 ft. It spite of its great depth, this well is largely impermeable below a depth of about 9,000 ft, thus providing an excellent target for stimulation. In order to prepare 46A-19RD for stimulation, however, it was necessary to pull the slotted liner. This proved to be unachievable under the budget allocated by the Coso Operating Company partners, and this aspect of the project was abandoned, ending the program at Coso. The program then shifted to the EGS project at Desert Peak, which had a goal similar to the one at Coso of creating an EGS on the periphery of an existing geothermal reservoir. Volume 3 describes the activities that the Coso team

  14. Impact of Role Clarity and Strategic Fit on Average Project Success: Moderating Role of Market Turbulence on Telecom Companies of Pakistan

    Directory of Open Access Journals (Sweden)

    Najam UL MABOOD

    2017-06-01

    Full Text Available Advancement in technology has reshaped the businesses across the globe forcing companies to perform tasks and activities in the form of projects. Stakeholder behavior, stakeholder management, strategic fit, role and task clarity are some of the factors that redesign the project success. The current study examine the impact of strategic fit and role clarity on the Average project success and further it enlightens the moderating role of Market turbulence on the relationship between the aforementioned independent and dependent variables. The population of the study comprises of telecom sector of Pakistan. The Data was collected from 201 project team members working on diverse project in Telecom companies of Rawalpindi and Islamabad. The Data was gathered through a questionnaires measured on Likert scale adopted from the study of Beringer, Jonas & Kock (2013. Each Questionnaire comprises of 3 items to measure each variable. SPSS 20.0 Version was used to analyze the data by applying Pearson correlation and multiple regression analysis technique. Findings depicted that role clarity and strategic fit contributed significantly in enhancing success of a project. Results further evidenced that market turbulence negatively moderated the relationship of independent variables on Average project success. The study at the end highlights recommendations for the future researchers.

  15. Geothermal Direct-Heat Utilization Assistance - Final Report; FINAL

    International Nuclear Information System (INIS)

    J. W. Lund

    1999-01-01

    The Geo-Heat Center provided (1) direct-use technical assistance, (2) research, and (3) information dissemination on geothermal energy over an 8 1/2 year period. The center published a quarterly bulletin, developed a web site and maintained a technical library. Staff members made 145 oral presentations, published 170 technical papers, completed 28 applied research projects, and gave 108 tours of local geothermal installations to 500 persons

  16. Geothermal Direct-Heat Utilization Assistance - Final Report

    Energy Technology Data Exchange (ETDEWEB)

    J. W. Lund

    1999-07-14

    The Geo-Heat Center provided (1) direct-use technical assistance, (2) research, and (3) information dissemination on geothermal energy over an 8 1/2 year period. The center published a quarterly bulletin, developed a web site and maintained a technical library. Staff members made 145 oral presentations, published 170 technical papers, completed 28 applied research projects, and gave 108 tours of local geothermal installations to 500 persons.

  17. Direct application of geothermal energy in the Republic of Macedonia

    International Nuclear Information System (INIS)

    Dimitrov, Konstantin

    1995-01-01

    The use of geothermal energy for balneology purposes has a history of many centuries. There is also a more than 30 years tradition for heating greenhouses. So called energy crisis of 70-ties and 80-ties provoked geology investigations in order to find possible energy sources, and development of systems for application of low-temperature geothermal water. Tere are a list of projects with direct application of geothermal energy for heating greenhouses, drying agricultural products. heating of public buildings and industrial projects, swimming pools , sanitary warm water preparation, industrial uses, etc. The essential energetic characteristics of different projects are presented in the paper. For the main projects a technical description of characteristics of the heating systems is given, and good technical solutions are underlined. Also the mistakes presented in some projects are listed. (Original)

  18. Geothermal Economics Calculator (GEC) - additional modifications to final report as per GTP's request.

    Energy Technology Data Exchange (ETDEWEB)

    Gowda, Varun; Hogue, Michael

    2015-07-17

    This report will discuss the methods and the results from economic impact analysis applied to the development of Enhanced Geothermal Systems (EGS), conventional hydrothermal, low temperature geothermal and coproduced fluid technologies resulting in electric power production. As part of this work, the Energy & Geoscience Institute (EGI) has developed a web-based Geothermal Economics Calculator (Geothermal Economics Calculator (GEC)) tool that is aimed at helping the industry perform geothermal systems analysis and study the associated impacts of specific geothermal investments or technological improvements on employment, energy and environment. It is well-known in the industry that geothermal power projects will generate positive economic impacts for their host regions. Our aim in the assessment of these impacts includes quantification of the increase in overall economic output due to geothermal projects and of the job creation associated with this increase. Such an estimate of economic impacts of geothermal investments on employment, energy and the environment will also help us understand the contributions that the geothermal industry will have in achieving a sustainable path towards energy production.

  19. Probes for the development of medium deep geothermal energy; Sonden zur Erschliessung der mitteltiefen Geothermie

    Energy Technology Data Exchange (ETDEWEB)

    Stuckmann, Uwe; Gottschalk, Daniel [REHAU AG und Co., Rehau (Germany)

    2011-10-24

    Compared to the near-surface geothermal energy, higher temperatures can be developed in the medium-depth geothermal energy (400 to 1,000 meters). Thus, the efficiency of geothermal power plants can be increased. The significantly higher yield performance and extraction performance are opposite to the higher costs of installation. At high thermal gradients of the surface one may completely dispense with the heat pump and directly heat. Geothermal probes at the current state of the art are reaching the limits of its applicability. Only newly developed geothermal probes offer a pressure resistance and temperature resistance in order to exploit these deeper regions. Such projects will be accompanied by the mining authority according to the power of approval. Extensive financial supports are available with the market incentive program of the Federal Government. Thus, the use of geothermal probes is possible in deeper regions. The feasibility and cost of future projects will be affected positively.

  20. Economic impacts of geothermal development in Malheur County, Oregon

    International Nuclear Information System (INIS)

    Sifford, A.; Beale, K.

    1993-01-01

    This study provides local economic impact estimates for a 100 megawatt (MW) geothermal power project in Oregon. The hypothetical project would be in Malheur County, shown in Figure 1. Bonneville Power Administration commissioned this study to quantify such impacts as part of regional confirmation work recommended by the Northwest Power Planning Council and its advisors. Malheur County was chosen as it has both identified resources and industry interest. Local economic impacts include direct, indirect, and induced changes in the local economy. Direct economic impacts result from the costs of plant development, construction, and operation. Indirect impacts result from household and local government purchases. Induced impacts result from continued responding as goods and services to support the households and local governments are purchased. Employment impacts of geothermal development follow a pattern similar to the economic impacts. Public service impacts include costs such as education, fire protection, roads, waste disposal, and water supply. The project assumption discussion notes experiences at other geothermal areas. The background section compares geothermal with conventional power plants. Power plant fuel distinguishes geothermal from other power sources. Other aspects of development are similar to small scale conventional thermal sources. The process of geothermal development is then explained. Development consists of well drilling, gathering system construction, power plant construction, plant operation and maintenance, and wellfield maintenance

  1. Interagency Geothermal Coordinating Council fifth annual report. Final draft

    Energy Technology Data Exchange (ETDEWEB)

    Abel, Fred H.

    1981-07-07

    Geothermal energy is the natural heat of the earth, and can be tapped as a clean, safe, economical alternative source of energy. Much of the geothermal energy resource is recoverable with current or near-current technology and could make a significant contribution both to increasing domestic energy supplies and to reducing the US dependence on imported oil. Geothermal energy can be used for electric power production, residential and commercial space heating and cooling, industrial process heat, and agricultural process applications. This report describes the progress for fiscal year 1980 (FY80) of the Federal Geothermal Program. It also summarizes the goals, strategy, and plans which form the basis for the FY81 and FY82 program activities and reflects the recent change in national policy affecting Federal research, development and demonstration programs. The Interagency Geothermal Coordinating Council (IGCC) believes that substantial progress can and will be made in the development of geothermal energy. The IGCC goals are: (1) reduce the institutional barriers so that geothermal projects can be on-line in one-half the current time; (2) make moderate temperature resources an economically competitive source of electricity; (3) remove the backlog of noncompetitive lease applications; (4) competitive lease all KGRA lands; and (5) cut the cost of hydrothermal technology by 25%.

  2. Geothermal heat pump

    International Nuclear Information System (INIS)

    Bruno, R.; Tinti, F.

    2009-01-01

    In recent years, for several types of buildings and users, the choice of conditioning by heat pump and low enthalpy geothermal reservoir has been increasing in the Italian market. In fact, such systems are efficient in terms of energy and consumption, they can perform, even at the same time, both functions, heating and cooling and they are environmentally friendly, because they do not produce local emissions. This article will introduce the technology and will focus on critical points of a geothermal field design, from actual practice, to future perspectives for the geo exchanger improvement. Finally, the article presents a best practice case in Bologna district, with an economic analysis showing the convenience of a geothermal heat pump. Conclusions of the real benefits of these plants can be drawn: compared to a non-negligible initial cost, the investment has a pay-back period almost always acceptable, usually less than 10 years. [it

  3. The Geothermal Data Repository: Five Years of Open Geothermal Data, Benefits to the Community: Preprint

    Energy Technology Data Exchange (ETDEWEB)

    Weers, Jonathan D [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Taverna, Nicole [National Renewable Energy Laboratory (NREL), Golden, CO (United States); Anderson, Arlene [U.S. Department of Energy

    2018-04-02

    In the five years since its inception, the Department of Energy's (DOE) Geothermal Data Repository (GDR) has grown from the simple idea of storing public data in a centralized location to a valuable tool at the center of the DOE open data movement where it is providing a tangible benefit to the geothermal scientific community. Throughout this time, the GDR project team has been working closely with the community to refine the data submission process, improve the quality of submitted data, and embrace modern proper data management strategies to maximize the value and utility of submitted data. This paper explores some of the motivations behind various improvements to the GDR over the last 5 years, changes in data submission trends, and the ways in which these improvements have helped to drive research, fuel innovation, and accelerate the adoption of geothermal technologies.

  4. Geothermal Loan Guaranty Program and its impact on geothermal exploration and development

    Energy Technology Data Exchange (ETDEWEB)

    Nasr, L.H.

    1978-05-01

    The study showed that the Geothermal Loan Guaranty Program has had only a negligible effect on geothermal development and the response to the program was far less than expected. The streamlining of environmental regulations and leasing policies, and the granting of intangible drilling cost write-offs and depletion allowances to operators would have had a greater impact on geothermal energy development. The loan guaranty program did not promote the undertaking of any new projects that would not have been undertaken without it. The program only accelerated the pace for some development which might have commenced in the future. Included in the study are recommendations for improving the operation of the program thereby increasing its attractiveness to potential applicants.

  5. Beyond the line: exploring the HRM responsibilities of line managers, project managers and the HRM department in four project-oriented companies in the Netherlands, Austria, the UK and the USA

    NARCIS (Netherlands)

    Keegan, A.; Huemann, M.; Turner, J.R.

    2012-01-01

    The topic of what human resource management (HRM) responsibilities are devolved from the HRM department to line managers has attracted much interest in recent years. We report findings from a study on the devolution of HRM practices in four project-oriented companies (POCs) and argue that although

  6. Program planner's guide to geothermal development in California

    Energy Technology Data Exchange (ETDEWEB)

    Yen, W.W.S.; Chambers, D.M.; Elliott, J.F.; Whittier, J.P.; Schnoor, J.J.; Blachman, S.

    1980-09-30

    The resource base, status of geothermal development activities, and the state's energy flow are summarized. The present and projected geothermal share of the energy market is discussed. The public and private sector initiatives supporting geothermal development in California are described. These include legislation to provide economic incentives, streamline regulation, and provide planning assistance to local communities. Private sector investment, research, and development activities are also described. The appendices provide a ready reference of financial incentives. (MHR)

  7. Geophysical considerations of geothermics

    Energy Technology Data Exchange (ETDEWEB)

    Hayakawa, M

    1967-01-01

    The development and utilization of geothermal energy is described from the standpoint of geophysics. The internal temperature of the Earth and the history and composition of magmas are described. Methods of exploration such as gravity, magnetic, thermal and electrical surveys are discussed, as are geochemical and infrared photogrammetric techniques. Examples are provided of how these techniques have been used in Italy and at the Matsukawa geothermal field in Japan. Drilling considerations such as muds, casings and cementing materials are discussed. Solutions are proposed for problems of environmental pollution and plant expansion.

  8. Victorian first for geothermal

    International Nuclear Information System (INIS)

    Wallace, Paula

    2014-01-01

    AGL Limited (AGL) will assist Maroondah Sports Club to save hundreds of thousands of dollars on its energy bills over the next decade by commencing work to install Victoria's first GeoAir geothermal cooling and heating system. Utilising the earth's constant temperature, the new GeoAir geothermal system provides a renewable source of energy that will save the club up to $12,000 in the first year and up to $150,000 over the next 10 years

  9. Geothermal and environment

    International Nuclear Information System (INIS)

    1993-01-01

    The production of geothermal-electric energy, presents relatively few contamination problems. The two bigger problems associated to the geothermal production are the disposition of waste fluids and the discharges to the atmosphere of non-condensable gases as CO 2 , H 2 O and NH 3 . For both problems the procedures and production technologies exist, like it is the integral use of brines and gases cleaning systems. Other problems consist on the local impact to forest areas for the effect of the vapor discharge, the contamination for noise, the contamination of aquifer shallow and the contamination related with the construction and termination of wells

  10. NANA Geothermal Assessment Program Final Report

    Energy Technology Data Exchange (ETDEWEB)

    Jay Hermanson

    2010-06-22

    In 2008, NANA Regional Corporation (NRC) assessed geothermal energy potential in the NANA region for both heat and/or electricity production. The Geothermal Assessment Project (GAP) was a systematic process that looked at community resources and the community's capacity and desire to develop these resources. In October 2007, the US Department of Energy's Tribal Energy Program awarded grant DE-FG36-07GO17075 to NRC for the GAP studies. Two moderately remote sites in the NANA region were judged to have the most potential for geothermal development: (1) Granite Mountain, about 40 miles south of Buckland, and (2) the Division Hot Springs area in the Purcell Mountains, about 40 miles south of Shungnak and Kobuk. Data were collected on-site at Granite Mountain Hot Springs in September 2009, and at Division Hot Springs in April 2010. Although both target geothermal areas could be further investigated with a variety of exploration techniques such as a remote sensing study, a soil geochemical study, or ground-based geophysical surveys, it was recommended that on-site or direct heat use development options are more attractive at this time, rather than investigations aimed more at electric power generation.

  11. Sierra Pacific Power Company Alturas Transmission Line Project, Final Environmental Impact Report/Environmental Impact Statement. Volume 2: Comments and responses

    International Nuclear Information System (INIS)

    1995-11-01

    Sierra Pacific Power Company has proposed the construction and operation of a 345,000 volt overhead electric power transmission line from Alturas, California to Reno, Nevada. This Environmental Impact Report/Environmental Impact Statement will assess the potential environmental impacts of the proposed project and alternatives. This report contains public comments which were received on the Draft EIR/S. Significant issues may be identified through public and agency comments

  12. 2008 Geothermal Technologies Market Report

    Energy Technology Data Exchange (ETDEWEB)

    Cross, J.; Freeman, J.

    2009-07-01

    This report describes market-wide trends for the geothermal industry throughout 2008 and the beginning of 2009. It begins with an overview of the U.S. DOE's Geothermal Technology Program's (GTP's) involvement with the geothermal industry and recent investment trends for electric generation technologies. The report next describes the current state of geothermal power generation and activity within the United States, costs associated with development, financing trends, an analysis of the levelized cost of energy (LCOE), and a look at the current policy environment. The report also highlights trends regarding direct use of geothermal energy, including geothermal heat pumps (GHPs). The final sections of the report focus on international perspectives, employment and economic benefits from geothermal energy development, and potential incentives in pending national legislation.

  13. Human Resources in Geothermal Development

    Energy Technology Data Exchange (ETDEWEB)

    Fridleifsson, I.B.

    1995-01-01

    Some 80 countries are potentially interested in geothermal energy development, and about 50 have quantifiable geothermal utilization at present. Electricity is produced from geothermal in 21 countries (total 38 TWh/a) and direct application is recorded in 35 countries (34 TWh/a). Geothermal electricity production is equally common in industrialized and developing countries, but plays a more important role in the developing countries. Apart from China, direct use is mainly in the industrialized countries and Central and East Europe. There is a surplus of trained geothermal manpower in many industrialized countries. Most of the developing countries as well as Central and East Europe countries still lack trained manpower. The Philippines (PNOC) have demonstrated how a nation can build up a strong geothermal workforce in an exemplary way. Data from Iceland shows how the geothermal manpower needs of a country gradually change from the exploration and field development to monitoring and operations.

  14. The Philip Morris Genome Project: a guide to tracking alliances of the world´s largest cigarette company

    Directory of Open Access Journals (Sweden)

    Alan Blum

    2018-03-01

    Full Text Available Background Beginning in the 1980s, tobacco control efforts shifted from school-based and clinic-based education about the dangers of smoking to direct confrontation of the tobacco industry. But the industry also evolved by developing innovative promotional campaigns, adopting new corporate identities, and forging alliances with other industries and charitable organizations. Methods To document the extent of the commercial, civic, political, academic, military,and cultural ties cultivated by the world´s largest cigarette manufacturer, Philip Morris, a continuous, 35-year ethnographic analysis was conducted, involving daily monitoring of the global business press; monthly review of tobacco industry trade publications; scrutiny of annual company reports; and attendance at 20 shareholders´ meetings, four international tobacco industry trade expositions, and over 200 sports, arts, and ethnic minority events sponsored by the company. Results 48 Philip Morris manufacturing facilities in 32 countries produce more than 800 billion cigarettes a year for 180 markets..A pioneer in sponsoring popular programs on the new medium of television in the 1950s; the company circumvented the 1971 ban on TV cigarette advertising by creating sporting events that were internationally televised. By acquiring beer and food companies In the 1980s, Philip Morris retained influence over the mass media covetous of advertising revenue. In 2002 the company changed its name to Altria to diminish the tobacco stigma. It makes the world´s top cigarette brand, Marlboro, and holds 28% of the global market excluding China. The company has forged an extensive network of alliances with agricultural, marketing, chemical, pharmaceutical, financial, packaging, entertainment, shipping, and technology companies, as well as ties to hundreds of museums, arts organizations, universities, libraries, and charities combating problems such as domestic violence, hunger, pollution, illiteracy, and

  15. High Temperature Perforating System for Geothermal Applications

    Energy Technology Data Exchange (ETDEWEB)

    Smart, Moises E. [Schlumberger Technology Corporation, Sugar Land, TX (United States)

    2017-02-28

    The objective of this project is to develop a perforating system consisting of all the explosive components and hardware, capable of reliable performance in high temperatures geothermal wells (>200 ºC). In this light we will focused on engineering development of these components, characterization of the explosive raw powder and developing the internal infrastructure to increase the production of the explosive from laboratory scale to industrial scale.

  16. 2014 Annual Report, Geothermal Technologies Office

    Energy Technology Data Exchange (ETDEWEB)

    none,

    2015-03-01

    In 2014, the Geothermal Technologies Office (GTO) made significant gains—increased budgets, new projects, key technology successes, and new staff. The Fiscal Year (FY) 2015 budget is at $55 million—roughly a 20% increase over FY 2014, and a strong vote of confidence in what the sector is doing to advance economically competitive renewable energy. GTO also remains committed to a balanced portfolio, which includes new hydrothermal development, EGS, and targeted opportunities in the low-temperature sector.

  17. Geothermal energy: opportunities for California commerce. Phase I report

    Energy Technology Data Exchange (ETDEWEB)

    1982-01-01

    California's geographic and end-use markets which could directly use low and moderate temperature geothermal resources are ranked and described, as well as those which have the highest potential for near-term commercial development of these resources. Building on previous market surveys, the assessment determined that out of 38 geothermal resource areas with characteristics for direct use development, five areas have no perceived impediments to near-term development: Susanville, Litchfield, Ontario Hot Springs, Lake Elsinore, and the Salton Sea Geothermal Field. Twenty-nine applications were compared with previously selected criteria to determine their near-term potential for direct use of geothermal fluids. Seven categories were found to have the least impediments to development; agriculture and district heating applications are considered the highest. Ten-year projections were conducted for fossil fuel displacement from the higher rated applications. It is concluded that greenhouses have the greatest displacement of 18 x 10/sup 6/ therms per year.

  18. Deep geothermal energy: the Soultz-sous-Forets experience

    International Nuclear Information System (INIS)

    Genter, A.; Guenot, N.; Graff, J.J.

    2010-01-01

    This paper presents the mining exploitation project of the geothermal heat at Soultz-sous-Forets, located 50 km NE of Strasbourg (Bas Rhin, France). A geothermal power plant, inaugurated mid-2008, will commercialize its own power generation soon. This power plant is owned by a consortium of French-German industrialists through the European economical interest group for the mining exploitation of heat. The paper presents the geological characteristics of the hot dry rock geothermal reservoir, the deep geothermal wells, the hydraulic stimulation of the reservoir rock, the surface equipments of the power plants and the production pumps, the activities of the site in 2008 and 2009 and the perspectives of development of this energy source in France in the light of the Soultz-sous-Forets site experience. (J.S.)

  19. Recovery Act:Rural Cooperative Geothermal development Electric & Agriculture

    Energy Technology Data Exchange (ETDEWEB)

    Culp, Elzie Lynn [Surprise Valley Electrification Corp., Alturas, CA (United States)

    2016-01-12

    Surprise Valley Electric, a small rural electric cooperative serving northeast California and southern Oregon, developed a 3mw binary geothermal electric generating plant on a cooperative member's ranch. The geothermal resource had been discovered in 1980 when the ranch was developing supplemental irrigation water wells. The 240°F resource was used for irrigation until developed through this project for generation of electricity. A portion of the spent geothermal fluid is now used for irrigation in season and is available for other purposes, such as greenhouse agriculture, aquaculture and direct heating of community buildings. Surprise Valley Electric describes many of the challenges a small rural electric cooperative encountered and managed to develop a geothermal generating plant.

  20. Economic impacts of geothermal development in Harney County, Oregon

    International Nuclear Information System (INIS)

    Sifford, A.; Beale, K.

    1991-12-01

    This study provides local economic impact estimates for a 100 megawatt (MW) geothermal power project in Oregon. The hypothetical project would be in Harney Count. Bonneville Power Administration commissioned this study to quantify such impacts as part of regional confirmation work recommended by the Northwest Power Planning Council and its advisors. Harney County was chosen as it has both identified resources and industry interest. Geothermal energy is defined as the heat of the earth. For purposes of this study, geothermal energy is heat capable of economically generating electricity (using available technology). That translates to steam or hot water over 300 degrees F. Local economic impacts include direct, indirect, and induced changes in the local economy. Direct economic impacts result from the costs of plant development, construction, and operation. Indirect impacts result from household and local government purchases. Induced impacts result from continued respending as goods and services to support the households and local governments are purchased. Employment impacts of geothermal development follow a pattern similar to the economic impacts. The workers associated with plant development bring their families to the area. Additional labor is required to provide support services for the new population. Local government services must also increase to support the new community growth and the geothermal plant itself. These changes yield indirect and induced employment impacts associated with the geothermal plant