WorldWideScience

Sample records for commission cnea science

  1. Coordination of the U.S. DOE-Argentine National Atomic Energy Commission (CNEA) science and technology implementing arrangement. Final report

    Ebadian, M.A.

    1998-01-01

    In 1989, the US Department of Energy (DOE) established the Office of Environmental Management (EM) and delegated to the office the responsibility of cleaning up the US nuclear weapons complex. EM's mission has three primary activities: (1) to assess, remediate, and monitor contaminated sites and facilities; (2) to store, treat, and dispose of wastes from past and current operations; and (3) to develop and implement innovative technologies for environmental remediation. To this end, EM has established domestic and international cooperative technology development programs, including one with the Republic of Argentina. Cooperating with Argentine scientific institutes and industry meets US cleanup objectives by: (1) identifying and accessing Argentine EM-related technologies, thereby leveraging investments and providing cost-savings; (2) improving access to technical information, scientific expertise, and technologies applicable to EM needs; and (3) fostering the development of innovative environmental technologies by increasing US private sector opportunities in Argentina in EM-related areas. Florida International University's Hemispheric Center for Environmental Technology (FIU-HCET) serves as DOE-OST's primary technology transfer agent. FIU-HCET acts as the coordinating and managing body for the Department of Energy (DOE)-Argentina National Atomic Energy Commission (CNEA) Arrangement. Activities include implementing standard operating procedures, tracking various technical projects, hosting visiting scientists, advising DOE of potential joint projects based on previous studies, and demonstrating/transferring desired technology. HCET hosts and directs the annual Joint Coordinating Committee for Radioactive and Mixed Waste Management meeting between the DOE and CNEA representatives. Additionally, HCET is evaluating the possibility of establishing similar arrangements with other Latin American countries

  2. Accreditation of testing laboratories in CNEA (National Atomic Energy Commission)

    Piacquadio, N.H.; Casa, V.A.; Palacios, T.A.

    1993-01-01

    The recognition of the technical capability of a testing laboratory is carried out by Laboratory Accreditation Bodies as the result of a satisfactory evaluation and the systematic follow up of the certified qualification. In Argentina the creation of a National Center for the Accreditation of Testing Laboratories, as a first step to assess a National Accreditation System is currently projected. CNEA, as an institution involved in technological projects and in the development and production of goods and services, has adopted since a long time ago quality assurance criteria. One of their requirements is the qualification of laboratories. Due to the lack of a national system, a Committee for the Qualification of Laboratories was created jointly by the Research and Development and Nuclear Fuel Cycle Areas with the responsibility of planning and management of the system evaluation and the certification of the quality of laboratories. The experience in the above mentioned topics is described in this paper. (author)

  3. Environmental impact statement requirements for CNEA

    Ciurciolo, Melisa N.; Mender, J. A.

    2009-01-01

    The purpose of this paper is to describe the legal framework on Environmental Impact Assessment (EIA) regarding the activities of the National Atomic Energy Commission (Comision Nacional de Energia Atomica, CNEA), and particularly, the Procedure for Internal Management of Environmental Impact Statements of CNEA (PN-PR-027). According to the distribution of powers stated in article 41 of the National Constitution, the environmental legal framework is constituted by National minimum standards for environmental protection and complementary provincial and municipal regulations. As a result, the EIA legal framework is not uniform across the Nation, and therefore, it differs according to the jurisdiction in which the activity subject to EIA is developed. Notwithstanding, the General Statute of the Environment (25.675) requires EIA for any project or activity developed in the National territory, which may cause a significant degradation to the environment, any of its components, or affect the populations' quality of life in a significant way. Since CNEA develops activities along the National territory, it is not possible to determine a uniform legal EIA framework for the entire Institution. Consequently, the binding requirements for Environmental Impact Statements (EISs) of CNEA activities differ among the activities developed in the different locations and atomic centers. In order to achieve a uniform environmental performance in CNEA, it has been considered necessary to uniform, in the internal sphere, the binding requirements for EIS, by means of a procedure written within the framework of the Environmental Management System of the Institution. The purpose of the Procedure for Internal Management of Environmental Impact Statements is to determine the requirements to be complied by the atomic centers, locations and enterprises associated with CNEA, regarding EIS Management. This Procedure shall apply to those projects and activities subjected to EIA, according to a

  4. CNEA's quality system documentation

    Mazzini, M.M.; Garonis, O.H.

    1998-01-01

    Full text: To obtain an effective and coherent documentation system suitable for CNEA's Quality Management Program, we decided to organize the CNEA's quality documentation with : a- Level 1. Quality manual. b- Level 2. Procedures. c-Level 3. Qualities plans. d- Level 4: Instructions. e- Level 5. Records and other documents. The objective of this work is to present a standardization of the documentation of the CNEA's quality system of facilities, laboratories, services, and R and D activities. Considering the diversity of criteria and formats for elaboration the documentation by different departments, and since ultimately each of them generally includes the same quality management policy, we proposed the elaboration of a system in order to improve the documentation, avoiding unnecessary time wasting and costs. This will aloud each sector to focus on their specific documentation. The quality manuals of the atomic centers fulfill the rule 3.6.1 of the Nuclear Regulatory Authority, and the Safety Series 50-C/SG-Q of the International Atomic Energy Agency. They are designed by groups of competent and highly trained people of different departments. The normative procedures are elaborated with the same methodology as the quality manuals. The quality plans which describe the organizational structure of working group and the appropriate documentation, will asses the quality manuals of facilities, laboratories, services, and research and development activities of atomic centers. The responsibilities for approval of the normative documentation are assigned to the management in charge of the administration of economic and human resources in order to fulfill the institutional objectives. Another improvement aimed to eliminate unnecessary invaluable processes is the inclusion of all quality system's normative documentation in the CNEA intranet. (author) [es

  5. Human resources development: capabilities and experience of CNEA and its institutes in Argentina

    Sbaffoni, M.M.; Soler, S.G.; Harriague, S.

    2007-01-01

    Full text: The Argentinean Atomic Energy Commission (Comision Nacional de Energia Atomica - CNEA) was created in 1950. CNEA and its related companies of the nuclear sector are presently active in several fields: operation of two nuclear power plants, construction of a third one, operation of several research reactors and critical facilities, production of Mo-99 from low enrichment targets (having world leadership in that field). Argentina has also exported, in the last twenty-five years, four research reactors (the last one, OPAL in Australia, attained criticality last year), and is active in the fuel cycle (having attained maturity in high-density and very high-density fuel for research reactors, among others), in radioisotope production and in nuclear medicine. The successful attainment of these achievements has always been supported by an active policy of human resources development, either through 'on the job' training activities guided by experienced professionals and sustained on a fellowship programme, or via institutes for under and postgraduate studies. This programme not only satisfies CNEA demands, but also helps providing highly qualified personnel to the local industry and research institutions. Nowadays, the perspective for nuclear energy is promising, but for many years nuclear activities had been loosing momentum worldwide. The nuclear sector became weaker, and CNEA was not an exception. However, it never stopped its activities in educational areas, knowing that many years are needed to form a solid professional in the nuclear field, and having the conviction that, for a sustainable development of the country, nuclear energy should necessarily be part of the supply. Nuclear engineers, material scientists and technologists, physicists, radio chemists, etc., ended up working in industries, universities and R and D institutions after finishing their education, instead of joining CNEA. In 2006 the Argentinean government re-launched nuclear energy

  6. Technology transfer in the CNEA: Between 'supply-slide' and nuclear plan

    Enriquez, Santiago N

    2012-01-01

    This paper reflects on linkage activities and technology transfer of Atomic Energy National Commission (CNEA). Given that the CNEA was a S and T institution, which was pioneer in activities to reach out the productive sector; it will show that, since 1961, the year of the creation of the Service of Technical Assistance to Industry (SATI) -; until today -where the Law 23.877 of Promotion of the Technological Innovation is fully implemented, different modes of technology transfer based on certain S and T policies are detected. First, it will describe the characteristics of the technology transfer made by SATI, and its connection with the political decisions made by the Department of Metallurgy of CNEA to relate the domestic industry and the Nuclear Plan. In a second instance, it will describe the effects on the technology transfer after the disabling of the Nuclear Plan in 1994, the enforcement of Law 23,877 in CNEA and progressive deactivation of SATI. Finally, it will reflect on the two main stages of technology transfer in CNEA for potential S and T policies (author)

  7. The role of CNEA as a TSO in the enhancement of nuclear safety

    Gho, C.J.

    2007-01-01

    Argentina's National Atomic Energy Commission (CNEA) was created in 1950 to promote the development of the pacific technological applications of nuclear energy within the country. Since its very beginning CNEA considered that nuclear development is possible only if it is supported by broad scientific knowledge and accompanied by an adequate progress of the needed technological capacities. Thus, an important investment was done to educate and prepare professionals to form a technical staff that had broad backgrounds; as a consequence, excellent educational and training Institutes were created, and a number of researchers, engineers and technologists were educated. Since the early days, CNEA has paid special attention to crucial aspects such as radiological protection and nuclear safety. CNEA has had a role in contributing to the national growth of Argentine scientific and technical sector. This role has been necessary not only to provide the basis for the development in national nuclear industry but also to set up its own professional staff, which lately gave technical and scientific support to the emerging sector. This was done by means of agreements with the main Argentine Universities as a new way to educate and train professional and efficient staff

  8. New nuclear data service at CNEA: retrieval of the update libraries from a local Web-Server; Nuevo servicio de datos nucleares en CNEA: obtencion de bibliotecas actualizadas desde un Servidor Local

    Suarez, Patricia M [Comision Nacional de Energia Atomica, Ezeiza (Argentina). Centro Atomico Ezeiza; Pepe, Maria E [Comision Nacional de Energia Atomica, General San Martin (Argentina). Centro Atomico Constituyentes; Sbaffoni, Maria M [Comision Nacional de Energia Atomica, Buenos Aires (Argentina). Gerencia de Tecnologia

    2000-07-01

    A new On-line Nuclear Data Service was implemented at National Atomic Energy Commission (CNEA) Web-Site. The information usually issued by the Nuclear Data Section of IAEA (NDS-IAEA) on CD-ROM, as well as complementary libraries periodically downloaded from the a mirror server of NDS-IAEA Service located at IPEN, Brazil are available on the new CNEA Web page. In the site, users can find numerical data on neutron, charged-particle, and photonuclear reactions, nuclear structure, and decay data, with related bibliographic information. This data server is permanently maintained and updated by CNEA staff members. This crew also offers assistance on the use and retrieval of nuclear data to local users. (author)

  9. New nuclear data service at CNEA: retrieval of the update libraries from a local Web-Server

    Suarez, Patricia M.; Pepe, Maria E.; Sbaffoni, Maria M.

    2000-01-01

    A new On-line Nuclear Data Service was implemented at National Atomic Energy Commission (CNEA) Web-Site. The information usually issued by the Nuclear Data Section of IAEA (NDS-IAEA) on CD-ROM, as well as complementary libraries periodically downloaded from the a mirror server of NDS-IAEA Service located at IPEN, Brazil are available on the new CNEA Web page. In the site, users can find numerical data on neutron, charged-particle, and photonuclear reactions, nuclear structure, and decay data, with related bibliographic information. This data server is permanently maintained and updated by CNEA staff members. This crew also offers assistance on the use and retrieval of nuclear data to local users. (author)

  10. ANL progress in developing a target and process for converting CNEA Mo-99 production to LEU

    Vandegrift, G.F.; Gelis, A.; Aase, S.; Bakel, A.; Freiberg, E.; Conner, C.

    2002-01-01

    The primary mission of the Reduced Enrichment in Research and Test Reactors (RERTR) Program is to facilitate the conversion of research and test reactor fuel and targets from high-enriched uranium (HEU) to low-enriched uranium (LEU). One of the current goals at Argonne National Laboratory (ANL) is to convert 99 Mo production at Argentine Commission Nacional de Energia Atomica (CNEA) from HEU to LEU targets. Specifically addressed in this paper is ANL R and D related to this conversion: (1) designing a prototype production vessel for digesting irradiated LEU foils in alkaline solutions, (2) developing means to improve digestion efficiency, and (3) modifying ion-exchange processes used in the CNEA recovery and purification of 99 Mo to deal with the lower volumes generated from LEU-foil digestion. (author)

  11. Qualification of testing laboratories of Comision Nacional de Energia Atomica - CNEA

    Casa, Adriana; Palacios, Tulio; Peretti, Matilde; Pucci, Gladys; Resnizki, Sara

    1996-01-01

    Testing and calibration laboratories of the Argentine Atomic Energy Commission which made services for the nuclear and conventional industries must prove the reliability of their results. It is achieved implanting at the laboratories, a management quality system, to proof the capacity and technical aptitude, with the establish minimal requirements. When the requirement are fulfilled, the laboratory would be in conditions for a national level accreditation within the National System of Standards, Quality and Certification, recently created for our national government. The Laboratories Calibration Board of CNEA had made some assessments of a group of laboratories in order to determine their quality level. (author)

  12. 78 FR 12355 - Notice of Establishment of the National Commission on Forensic Science and Solicitation of...

    2013-02-22

    ... Forensic Science and Solicitation of Applications for Commission Membership AGENCY: Department of Justice... Commission on Forensic Science. This notice establishes criteria and procedures for the selection of members... General will be establishing the National Commission on Forensic Science (``Commission''). The Attorney...

  13. The creation of the Argentine Atomic Energy Commission

    Marzorati, Zulema del V.

    2000-01-01

    After a mention to the Argentine regulation of 1945 concerning the export of uranium ores and a short description of the 'Richter affair', the decree 10936 of 1950, that creates the Argentine Atomic Energy Commission (CNEA) , is analyzed. The activities of the CNEA between the years 1952 - 1955 are also outlined

  14. Time for Change? Climate Science Reconsidered: Report of the UCL Policy Commission on Communicating Climate Science, 2014

    Rapley, C. G.; De Meyer, K.; Carney, J.; Clarke, R.; Howarth, C.; Smith, N.; Stilgoe, J.; Youngs, S.; Brierley, C.; Haugvaldstad, A.; Lotto, B.; Michie, S.; Shipworth, M.; Tuckett, D.

    2014-01-01

    The UCL Policy Commission on the Communication of Climate Science, chaired by Professor Chris Rapley comprises a cross-disciplinary project group of researchers from psychology, neuroscience, science and technology studies, earth sciences and energy research. The Commission examined the challenges faced in communicating climate science effectively to policy-makers and the public, and the role of climate scientists in communication. / The Commission explored the role of climate scientists in c...

  15. IFPE/CNEA-MOX-RAMP, CNEA Power Ramp Irradiations with (PHWR) MOX Fuels

    Marino, Armando Carlos; Turnbull, J.A.

    2000-01-01

    Description: The irradiation of the first MOX nuclear fuel rods fabricated in Argentina began in 1986. These experiences were made in the HFR-Petten reactor, Holland. The six rods were fabricated in the a Facility (GAID-CNEA-Argentina). The first rod has been used for destructive pre-irradiation characterization in the KFK (Kernforschungszentrum Karlsruhe), Germany. The second one was a pathfinder for calibrating HFR systems in Petten. Two other rods included pellets doped with iodine. The first contained mostly CsI whilst the second contained elemental iodine. The concentration of iodine was intended to simulate a burn-up of 15000 MWd/ton(M). The power histories were defined from calculations performed with the BACO code. A 15 day cycle was assumed with a power history that induced PCMI during power cycling. The last high power period was maintained until stress corrosion cracking (SCC) was induced. Two further un-doped rods were used in a sub-program named BU15. Here a burn-up of 15000 MWd/ton(M) was achieved at a low power followed by a final power ramp for one of the rods. The ramp was similar to that used for the Iodine test. The HFR irradiation was conducted satisfactorily. The objective was to attempt a correspondence in behaviour between the doped rods and BU15 rods. PIE detected the presence of micro-cracks inside the cladding of the iodine doped rods. Ramping of the BU15 rod was interrupted when an increase of coolant activity was detected. After discharge, a visual inspection of the rod showed the presence of a small circular hole in the cladding. Additional PIE showed that the hole was due to a SCC failure

  16. Technologic spin-off from CNEA's activities

    Belinco, Cesar G.

    2001-01-01

    An analysis is made of the spin-off of technology from the nuclear activities in Argentina. Several examples are mentioned in fields such as material sciences, non-destructive testing, forensic research, space activities, instrumentation as well as in environmental studies

  17. Members of the Science and Technology Commission, Spanish Senate

    Maximilien Brice

    2002-01-01

    Photo 01: (left to right) Mr Francisco Xabier Albistur, Senator; Mrs Mercedes Senen, Lawyer of the Commission; Mr Ramon Antonio Socias, Second Vice-President of the Commission; Prof. Luciano Maiani, CERN Director-General, Mr Alonso Arroyo, President of the Commission, signing the VIP visitors' book; and Mr Adolfo Abejon, Senator. Photo 02: Mr Alonso Arroyo, President of the Commission, signing the VIP visitors' book. Photos 03, 04: Mr Ramon Antonio Socias, Second Vice-President of the Commission, signing the VIP visitors' book; and Mr Adolfo Abejon, Senator. Photo 05: Mr Francisco Xabier Albistur, Senator, signing the VIP visitors' book. Photo 06: Mrs Mercedes Senen, Lawyer of the Commission, signing the VIP visitors' book. Photo 07: (left to right) Mr Francisco Xabier Albistur, Senator; Prof. Juan Antonio Rubio, Education and Technology Transfer Division Leader; Prof. Luciano Maiani, CERN Director-General; Mr Ramon Antonio Socias, Second Vice-President of the Commission; Mr Alonso Arroyo, President of the C...

  18. The CEDICAE and the paper collections conservation and restoration Laboratory at CNEA : present and future organization and projects

    Calvo, Ana M.; Semino, Maria S.; Romero, Gregoria O.; Alfaro, Laura S.; Miranda, Maria V.; Chinen, Silvia P.

    2009-01-01

    In Ezeiza Atomic Center (CAE), there is a working group formed by staff members from a Documentation and Information Center known as 'Lic. Maria Isabel Gonzalez' (CEDICAE) and from the CNEA Paper Collections Conservation and Restoration Laboratory. New personnel were hired in 2007, which allowed the reorganization of tasks and gave way to the creation of new projects. By conducting weekly morning meetings, the working group decided to organize and plan the activities that had to be conducted. From the first moment, the main objective of the group was to offer a service of excellence, i.e. to provide a duly and timely response to the bibliographical requests made by users, to perform tasks in the laboratory, to train members in diverse subjects of preventive conservation, surveys and evaluations of archives and libraries, and tasks of restoration of our own material and material from third parties. Among the projects carried out by the CEDICAE, the following are included: Firstly, the continuous training and education of its personnel, training of users in topics dealing with the use of the MINCyT Library, participation in the Internal Network of Libraries (REDIN) in order to adopt a joint policy by CNEA libraries, participation in the Network RRIAN (Regional Network of Information for Latin America and the Caribbean in the Nuclear Field), participation in the Federal Network of Libraries and Information, with the National Commission of Public Libraries (CONABIP) and with the Documentation Center of the Ministry of Economy and so on. It has worked in training of personnel working at the institutions that submit requests to the Laboratory (SERPAJ, Monastery of San Francisco, Ministry of Economy, CONABIP, etc) regarding topics of preventive conservation. It has realised a mockup of bibliographical recovery of damaged material after any climate disasters and has conducted surveys and evaluations from the point of view of preventive conservation. In this sense and as an

  19. 2004 status of RERTR activities of CNEA - Argentina

    Audero, M.; Balart, S.; Boero, N.; Cabot, P.; Manzini, A.; Pasqualini, E.; Ruggirello, G.; Taboada, H.

    2005-01-01

    During 2004 several activities related to RERTR topics has taken place. In what follows, a resume of those activities is presented. During 2004 the Nuclear Fuel Cycle Program has supported the activities of about a hundred of researchers and technicians involved on different aspects of Very high density fuel developpement (VHD) fuel development as R and D, mini-plates, plates and fuel assemblies fabrication, irradiation and PIE analyses of VHD fuels. CNEA's LEU MTR fuel waste disposal plans are concerned with spent fuel from the reactor RA-3. The SF will be kept in interim storage until a geological repository is available for disposal. According to the current planning, this repository would be available in the year 2050 to receive the SF from the NPPs or the HLW from their reprocessing. Since 2002 the domestic production of Mo99 and other fission radioisotopes is performed using LEU targets, fulfilling international technical and quality standards. Up to present more than 600 targets bearing LEU material have been fabricated irradiated and processed. Very recently CNEA has also become an international supplier of targets for Mo-99 production. This status report deals as well with the International framework i.e. Global Threat Reduction Initiative and the historical involvement of Argentina in the peaceful applications of nuclear energy

  20. Technologic spin-off from CNEA's activities; Tecnologias derivadas de las actividades de la CNEA

    Belinco, Cesar G [Comision Nacional de Energia Atomica, General San Martin (Argentina). Centro Atomico Constituyentes

    2001-07-01

    An analysis is made of the spin-off of technology from the nuclear activities in Argentina. Several examples are mentioned in fields such as material sciences, non-destructive testing, forensic research, space activities, instrumentation as well as in environmental studies.

  1. Qualification of high-density fuel manufacturing for research reactors at CNEA

    Adelfang, P.; Alvarez, L.; Boero, N.; Calabrese, R.; De La Fuente, M.; Echenique, P.; Markiewicz, M.; Pasqualini, E.; Ruggirello, G.; Taboada, H. [CNEA, Buenos Aires (Argentina)

    2001-07-01

    CNEA, the National Atomic Energy Commission of Argentina, is at the present a qualified supplier of uranium oxide fuel for research reactors. A new objective in this field is to develop and qualify the manufacturing of LEU high-density fuel for this type of reactors. According with the international trend Silicide fuel and U-xMo fuel are included in our program as the most suitable options. The facilities to complete the qualification of high-density MTR fuels, like the manufacturing plant installations, the reactor, the pool side fuel examination station and the hot cells are fully operational and equipped to perform all the activities required within the program. The programs for both type of fuels include similar activities: development and set up of the fuel material manufacturing technology, set up of fuel plate manufacturing, fabrication and irradiation of miniplates, fabrication and irradiation of full scale fuel elements, post-irradiation examination and feedback for manufacturing improvements. For silicide fuels most of these steps have already been completed. For U-xMo fuel the activities also include the development of alternative ways to obtain U-xMo powder, feasibility studies for large-scale manufacturing and the economical assessment. Set up of U-xMo fuel plate manufacturing is also well advanced and the fabrication of the first full scale prototype is foreseen during this year. (author)

  2. Members of the Science and Technology Commission, Spanish Senate visit ATLAS

    Maximilien Brice

    2002-01-01

    Photo 01: Members of the Science and Technology Commission, Spanish Senate, in front of a barrel toroid cryostat vessel in the ATLAS assembly hall. The air-core ATLAS barrel toroid magnet system will consist of eight large superconducting coils, each in its own vacuum vessel, built by Spanish company Felguera Construcciones Mecanicas SA under the responsibility of IFAE (Institute for High Energy Physics), Barcelona. Standing (left to right): Dr Peter Jenni, ATLAS spokesperson; Dr Manuel Aguilar-Benitez, delegate for Spain to CERN Council; Mrs Mercedes Senen, Lawyer of the Commission; Mr Alonso Arroyo, President of the Commission; Mr Ramon Antonio Socias, Second Vice-President of the Commission; Mr Francisco Xabier Albistur, Senator; H.E. Mr Joaquin Pérez-Villaneuva Y Tovar, Ambassador, Permanent Representative of Spain to the Office of the United Nations in Geneva and other international organisations in Switzerland, Spanish delegate to CERN Council; and Miguel Gomez. Seated (left to right): Mr Adolfo Abejon...

  3. The report on the activities of the PAU Commission on the History of Science in 2016/2017

    Michał Kokowski

    2017-12-01

    Full Text Available The report discusses the activities of the Commission on the History of Science of the Polish Academy of Arts and Sciences in 2016/2017. It presents the lists of: scientific meeting, conferences, and new publications.

  4. The role of the CNEA like organization of scientific and technological support to accentuate the nuclear security

    2007-01-01

    The activity developed by the CNEA in this subject from its creation, is based on an attitude responsible in the care for the people, the society and the environment, conduct that has remained after its restructuring in 1994. PEN No 1540/74 decree transferred the nuclear power generation activity to NUCLEOELECTRICA ARGENTINA S.A. and the regulatory activities to the ENTE NACIONAL REGULADOR NUCLEAR, today NUCLEAR REGULATORY AUTHORITY (ARN). The CNEA has the following attributions by Law No 24,804/97 'National Law of the Nuclear Activity', regulator of the Nuclear Activity in the Argentine Republic that it establishes, among other aspects, that the CNEA will have: a) Advising the Executive Power on nuclear policy issues. b) Promoting training of highly specialized human resources, scientific and technological developments in the nuclear field, and including the promotion and development programs for technological innovations. c) Fostering technology transfer programs for the technology that was acquired and developed by the Institution, arid for which the Institution has a patent, in compliance with the non-proliferation commitments signed by the Argentine Republic. d) Exercising the responsibility of radioactive waste management activities as established by the specific law. e) Defining the procedures for decommissioning nuclear energy generation facilities and all other relevant radioactive installations. f) Providing the services requested by nuclear power plants and other nuclear installations. g) Exercising the rights of the National Government on special fissionable materials included in irradiated fuel elements. h) Exercising the rights of property of the National Government on special fusion materials, which are imported or developed in the country. i) Developing, building and operating experimental nuclear reactors. j) Developing uses for radioisotopes and radiation in biological, medical and industrial applications. k) Performing exploration of minerals for

  5. Training of manpower resources at the National Atomic Energy Commission of Argentina

    Ambrosis de Libanati, Nelly

    1982-01-01

    The main factors that influenced the development of the manpower resources required by CNEA over its thirty years of life are discussed: a careful specialized training; basic and applied research groups as a basic support for the other activities; teams responsible for the applications and for the concrete realizations of increasing complexity carried out by CNEA, culminating with the nuclear power plants; CNEA's relations with the national educational system regarding nuclear specialization; CNEA's international interaction, either by the participation of foreigners in its internal courses, by the commissioning of Argentinians abroad, and by the cooperation with international agencies in organizing courses, seminars and conferences; the influence of the radiological protection and nuclear safety requirements on the training programs, on nuclear industry, and on the users of radioisotopes and radiations; the importance of feeding the results of each activity back into the system so as to obtain a dynamic programming adapted to the requirements at all times. (M.E.L.) [es

  6. Radiological and Medical Sciences Research Institute, Ghana Atomic Energy Commission: Annual Report 2014

    2014-01-01

    The Radiological and Medical Sciences Research Institute was established in 2009, as the forth research institute of the Ghana Atomic Energy Commission. This Annual Report provides an overview of the major activities of the Institutes in the year 2014. Major items covered in the report include: Strategic objectives; Collaborations; Personnel and Organisational Structure; Facilities and Technical Services; Summary of Research and Development Projects; Human Resource Development; Publications and Technical Reports.

  7. The soil education technical commission of the Brazilian Soil Science Society: achievements and challenges

    Muggler, Cristine Carole; Aparecida de Mello, Nilvania

    2013-04-01

    The Soil Education and public awareness technical commission of the Brazilian Soil Science Society was created in 1987 as Soil Science teaching commission at that time. In the 90's of the last century the commission was very active and realized three national symposia in the years 1994 to 1996: in Viçosa, Minas Gerais; Santa Maria, Rio Grande do Sul and Pato Branco, Paraná. The following symposium scheduled to happen in Brasilia, 1997 could not be realized and was followed by a weakening and reduction of the involved group. Those three symposia were focused on the aspects of soil science taught at the university educational level, mainly in agrarian sciences. The concern about what was going on at basic education and perception by society was not much present. The commission was revitalized in 2005 and in 2007 realized its first meeting at the Brazilian Congress of Soil Science in Gramado, Rio Grande do Sul. At that meeting it was already an urge to assume the approach of soil education instead of soil science teaching, within a major concern how society consider soils. It was accepted and adequate under the structural reorganization undergone by the national society following the IUSS main lines. The commission was renamed and got two new mates at the newly created Division IV, Soils, Environment and Society, of the Brazilian Soil Science Society: Soils and Food Safety and History, Epistemology and Sociology of Soil Science. The national symposia were relaunched to happen biannually. An inventory of the soil education experiences around the country started and the geographic distribution of the future symposia intended to rescue and bring together experiences in different parts of the country that would not be known by other means. Three symposia were already realized: Piracicaba, Sao Paulo, 2008 (southeast); Curitiba, Paraná, 2010 (south) and Sobral, Ceará, 2012 (northeast). The next is planned to happen in Recife, Pernambuco in April 2014. The scope of the

  8. Development and applications of monocrystalline silicon radiation sensors fabricated at Comision Nacional de Energia Atomica (CNEA)

    Bolzi, C; Bruno, C; Duran, J; Godfrin, E; Martinez Bogado, M; Pla, J; Tamasi, M

    2005-01-01

    The development of silicon photovoltaic sensors at CNEA has begun in 1998.These sensors, fabricated in the Photovoltaic Laboratory of the Solar Energy Group at Constituyentes Atomic Center, have been used to build low cost radiometers as well as solar angular position sensors on board of artificial satellites.The design, fabrication and calibration of these sensors have been made in different prototypes in order to analyze its performance and to evaluate its limitations.Nowadays, several commercial prototypes have been distributed in different laboratories of our country in order to evaluate them in real work conditions.Particularly, the first experiment of argentine solar cells on space performed on board of SAC-A satellite, included the fabrication of position sensors of this satellite as part of the alignment system of the solar array respect to the sun.In this article, the state of the art of monocrystalline silicon photovoltaic sensors fabricated at CNEA for terrestrial and space applications is presented

  9. Report on the activities of the PAU Commission on the History of Science in 2015/2016

    Michał Kokowski

    2016-11-01

    Full Text Available The report discusses the activities of the Commission on the History of Science of the Polish Academy of Arts and Sciences in 2015/2016. It presents the lists of: scientific meeting, administrative-election meetings, new members, and new publications.

  10. Implementation of the TDCR liquid scintillation method at CNEA-LMR, Argentina.

    Arenillas, Pablo; Cassette, Philippe

    2006-01-01

    During the last two years, a triple-to-double coincidence ratio (TDCR) system was assembled and adjusted at the CNEA-LMR, Argentina. The new counting system will add complementary capabilities to the absolute measurements section of the CNEA-LMR. This work describes its implementation and validation. Several checks and a set of beta-emitting standard solutions were used in order to perform the validation experiments. In preliminary measurements, a 3H LNHB solution with reference activity concentration of (119.7+/-0.9) kBq/g on 11 November 2003 was used. The CNEA-LMR TDCR counter gave, at the same reference date, an activity concentration of (120+/-1) kBq/g. Results and improvements are presented in detail. Concerning the asymmetry of the system, the quantum efficiency of the three photomultiplier tubes was studied for different operating conditions of the focusing voltage. The counter also includes an automatic system to change the efficiency by defocusing the photomultipliers and on the other hand, it was coupled to a HPGe detector to also measure beta-gamma coincidences.

  11. Implementation of the TDCR liquid scintillation method at CNEA-LMR, Argentina

    Arenillas, Pablo [Laboratorio de Metrologia de Radioisotopos, Comision Nacional de Energia Atomica (Argentina); Cassette, Philippe [Laboratoire National Henri Becquerel, LNE-LNHB, 91191, Gif sur Yvette cedex (France)

    2006-10-15

    During the last two years, a triple-to-double coincidence ratio (TDCR) system was assembled and adjusted at the CNEA-LMR, Argentina. The new counting system will add complementary capabilities to the absolute measurements section of the CNEA-LMR. This work describes its implementation and validation. Several checks and a set of beta-emitting standard solutions were used in order to perform the validation experiments. In preliminary measurements, a {sup 3}H LNHB solution with reference activity concentration of (119.7{+-}0.9) kBq/g on 11 November 2003 was used. The CNEA-LMR TDCR counter gave, at the same reference date, an activity concentration of (120{+-}1) kBq/g. Results and improvements are presented in detail. Concerning the asymmetry of the system, the quantum efficiency of the three photomultiplier tubes was studied for different operating conditions of the focusing voltage. The counter also includes an automatic system to change the efficiency by defocusing the photomultipliers and on the other hand, it was coupled to a HPGe detector to also measure beta-gamma coincidences.

  12. Implementation of the TDCR liquid scintillation method at CNEA-LMR, Argentina

    Arenillas, Pablo; Cassette, Philippe

    2006-01-01

    During the last two years, a triple-to-double coincidence ratio (TDCR) system was assembled and adjusted at the CNEA-LMR, Argentina. The new counting system will add complementary capabilities to the absolute measurements section of the CNEA-LMR. This work describes its implementation and validation. Several checks and a set of beta-emitting standard solutions were used in order to perform the validation experiments. In preliminary measurements, a 3 H LNHB solution with reference activity concentration of (119.7±0.9) kBq/g on 11 November 2003 was used. The CNEA-LMR TDCR counter gave, at the same reference date, an activity concentration of (120±1) kBq/g. Results and improvements are presented in detail. Concerning the asymmetry of the system, the quantum efficiency of the three photomultiplier tubes was studied for different operating conditions of the focusing voltage. The counter also includes an automatic system to change the efficiency by defocusing the photomultipliers and on the other hand, it was coupled to a HPGe detector to also measure beta-gamma coincidences

  13. Female Contributions in Nuclear Science: Experiences at the Brazilian Commission for Nuclear Energy (CNEN/LAPOC)

    Carrijo da Silva Dias, D.; Leandro Bonifácio, R.; Augusto da Silva Alfenas, R.

    2015-01-01

    Female professional contributions in nuclear science and technology are no longer a novelty. Names such as Marie Curie, Chen Shiung Wu and Rosalyn Yalow are evidence of the incessant, worldwide efforts of women to take part in fields largely reserved for men. Although society has witnessed high level female achievements as early as in the 1800s, female scientists and technicians still face a long journey ahead in empowering themselves into full and equal participation in these areas. Today, the Laboratory of Poços de Caldas of the Brazilian Commission for Nuclear Energy (CNEN/LAPOC) experiences a process of women empowerment at all levels of the institution. At the Technical Section, two of the seven research departments are headed by female researchers who play essential roles in the institution’s quest for excellence. Today, their work include coordination of a major environmental research project involving most researchers at LAPOC, successful participations on international intercomparisons of radiometric analysis and development of new methodologies in nuclear field applications. At the administrative level, female collaborators lead the Administration Section, improving several aspects of internal management, promoting further interaction at the workplace and strengthening cooperation among all departments. Regarding the capacitation level, the Commission has a long tradition of welcoming students and junior researchers through institutional programmes of training and collaboration in several projects. Today CNEN/LAPOC works with twenty scholarship grantees — half of which are women. Not only the Laboratory has reached equality in participation, but unarguably the female participants have demonstrated the most remarkable achievements among the group, attested by their continuous academic pursuit through Master’s and Doctoral degrees, full collaboration in scientific publishing and attendance in training programmes at international level. The purpose

  14. Involving stakeholders in the commissioning and implementation of fishery science projects: experiences from the U.K. Fisheries Science Partnership.

    Armstrong, M J; Payne, A I L; Deas, B; Catchpole, T L

    2013-10-01

    Following from similar initiatives worldwide, the U.K.'s Fisheries Science Partnership (FSP) was established in 2003 to provide the fishing industry with opportunities to propose and participate in scientific studies in collaboration with fishery scientists. Key concepts were that most of the available funding would support industry participation, that industry, not scientists, would come up with the ideas for projects, and that commercial fishing vessels and fishing methods would be used to address specific concerns of the fishing industry in a scientifically controlled manner. Nearly 100 projects had been commissioned by March 2012, covering annual time-series surveys of stocks subject to traditional assessment, and ad hoc projects on, e.g. gear selectivity, discard survival, tagging and migration and fishery development. The extent to which the results of the projects have been used by stakeholders, fishery scientists and fishery managers at a national and E.U. level is evaluated, along with the degree of industry interest and involvement, and reasons are identified for successes or failures in the uptake of the results into management and policy. Finally, the question is posed whether the programme has been successful in improving the engagement of the fishing community in the science-management process and in fostering communication and greater trust between fishers, scientists and managers. © 2013 Crown Copyright. © 2013 The Fisheries Society of the British Isles.

  15. Seventh Semiannual Report of the Commission to the Congress: Atomic Energy and the Physical Sciences, January 1950

    Lilienthal, David E.

    1950-01-01

    The document represents the seventh semiannual Atomic Energy Commission (AEC) report to Congress. The report sums up briefly the major activities and developments in the national atomic energy program in Part I. Part II focuses on research in the physical sciences and progress in atomic energy.

  16. Ghana Space Science and Technology Institute (GSSTI),Ghana Atomic Energy Commission: Annual Report 2013/2014

    2014-01-01

    The report presents the structure as well as the research projects of the newly established Ghana Space Science and Technology Institute of the Ghana Atomic Energy Commission from January to December 2014. Research projects listed are in the areas of Astronomy and Astrophysics; Remote Sensing; Electronics and Instrumentation; and Satellite Communication.

  17. The Argentine nuclear policy: evaluation and proposals of the National Atomic Energy Commission

    2001-01-01

    The document summarizes de medium term plan for the nuclear activities of the country proposed to the Government by the National Atomic Energy Commission (CNEA). An analysis of the present situation is followed by the consideration of the main topics: nuclear power generation, regulatory activities, fuel cycle, radioisotopes and ionizing radiations, radioactive wastes and spent fuels, research, development and human resources, international relations, and the role of the CNEA and its associate companies in the implementation of the plan. A short review is made of the economical aspects of the Argentine nuclear sector

  18. Brazil-Argentina bilateral cooperation - Protocol 11. Nuclear safety and radiation protection. Visit of CNEA engineers to Brazil

    Gasparian, A.E.

    1991-01-01

    The activities carried out by Techniques of Argentine Organization (CNEA) during visitation to Angra dos Reis (Brazil) are related. Licensing procedures for nuclear installations (reactors), and transport, licensing of personnels for nuclear installations, quality assurance and regulatory inspections were discussed. (M.C.K.)

  19. ANL progress in developing an LEU target and process for Mo-99 production: Cooperation with CNEA

    Gelis, A.V.; Vandegrift, G.F.; Aase, S.B.; Bakel, A.J.; Falkenberg, J.R.; Regalbuto, M.C.; Quigley, K.J.

    2003-01-01

    The primary mission of the Reduced Enrichment in Research and Test Reactors (RERTR) Program is to facilitate the conversion of research and test-reactor fuel and targets from high-enriched uranium (HEU) to low-enriched uranium (LEU). One of the current goals at Argonne National Laboratory (ANL) is to assist the Argentine Comision Nacional de Energia Atomica (CNEA) in developing an LEU foil target and a process for 99 Mo production. Specifically addressed in this paper is ANL R and D related to this conversion: (1) designing a prototype production vessel for digesting irradiated LEU foils in alkaline solutions and (2) developing a new digestion method to address all issues related to HEU to LEU conversion. (author)

  20. Advances and highlights of the CNEA qualification program as high density fuel manufacturer for research reactors

    Adelfang, P.; Alvarez, L.; Boero, N.; Calabrese, R.; Echenique, P.; Markiewicz, M.; Pasqualini, E.; Ruggirello, G.; Taboada, H. [Unidad de Actividad Combustibles Nucleares Comision Nacional de Energia Atomica (CNE4), Avda. del Libertador, 8250 C1429BNO Buenos Aires (Argentina)

    2002-07-01

    One of the main objectives of CNEA regarding the fuel for research reactors is the development and qualification of the manufacturing of LEU high-density fuels. The qualification programs for both types of fuels, Silicide fuel and U- x Mo fuel, are similar. They include the following activities: development and set up of the fissile compound manufacturing technology, set up of fuel plate manufacturing, fabrication and irradiation of mini plates and plates, design and fabrication of fuel assembly prototypes for irradiation, post-irradiation examination and feedback for manufacturing improvements. This paper describes the different activities performed within each program during the last year and the main advances and achievements of the programs within this period. The main achievements may be summarized in the following activities: Continuation of the irradiation of the first silicide fuel element in the R A3. Completion of the manufacturing of the second silicide fuel element, licensing and beginning of its irradiation in the R A3. Development of the HMD Process to manufacture U-Mo powder (pUMA project). Set up of fuel plates manufacturing at industrial level using U-Mo powder. Preliminary studies and the design for the irradiation of mini plates, plates and full scale fuel elements with U-Mo and 7 g U/cm{sup 3}. PIE destructive studies for the P-04 silicide fuel prototype (accurate burnup determination through chemical analysis, metallography and SEM of samples from the irradiated fuel plates). Improvement and development of new characterization techniques for high density fuel plates quality control including US testing and densitometric analysis of X-ray examinations. The results obtained in this period are encouraging and also allow to foresee a wider participation of CNEA in the international effort to qualify U-Mo as a new material for the manufacturing of research reactor fuels. (author)

  1. Advances and highlights of the CNEA qualification program as high density fuel manufacturer for research reactors

    Adelfang, P.; Alvarez, L.; Boero, N.; Calabrese, R.; Echenique, P.; Markiewicz, M.; Pasqualini, E.; Ruggirello, G.; Taboada, H.

    2002-01-01

    One of the main objectives of CNEA regarding the fuel for research reactors is the development and qualification of the manufacturing of LEU high-density fuels. The qualification programs for both types of fuels, Silicide fuel and U- x Mo fuel, are similar. They include the following activities: development and set up of the fissile compound manufacturing technology, set up of fuel plate manufacturing, fabrication and irradiation of mini plates and plates, design and fabrication of fuel assembly prototypes for irradiation, post-irradiation examination and feedback for manufacturing improvements. This paper describes the different activities performed within each program during the last year and the main advances and achievements of the programs within this period. The main achievements may be summarized in the following activities: Continuation of the irradiation of the first silicide fuel element in the R A3. Completion of the manufacturing of the second silicide fuel element, licensing and beginning of its irradiation in the R A3. Development of the HMD Process to manufacture U-Mo powder (pUMA project). Set up of fuel plates manufacturing at industrial level using U-Mo powder. Preliminary studies and the design for the irradiation of mini plates, plates and full scale fuel elements with U-Mo and 7 g U/cm 3 . PIE destructive studies for the P-04 silicide fuel prototype (accurate burnup determination through chemical analysis, metallography and SEM of samples from the irradiated fuel plates). Improvement and development of new characterization techniques for high density fuel plates quality control including US testing and densitometric analysis of X-ray examinations. The results obtained in this period are encouraging and also allow to foresee a wider participation of CNEA in the international effort to qualify U-Mo as a new material for the manufacturing of research reactor fuels. (author)

  2. ANL progress on the cooperation with CNEA for the MO-99 production: Base-side digestion process

    Gelis, A.V.; Quigley, K.J.; Aase, S.B.; Bakel, A.J.; Leyva, A.; Regalbuto, M.C.; Vandergrift, G.F.

    2005-01-01

    Conversion from high-enriched uranium (HEU) to low-enriched uranium (LEU) targets for the Mo-99 production requires certain modifications of the target design, the digestion and the purification processes. ANL and the Argentine Comision Nacional de Energia Atomica (CNEA) are collaborating to overcome all the concerns caused by the conversion of the CNEA process to use LEU foil targets. A new digester with stirring system has been successfully applied for the digestion of the low burn-up U foil targets in KMnO 4 alkaline media. In this paper, we report the progress on the development of the digestion procedure utilizing effective stirring and focusing on minimization of the liquid radioactive waste. (author)

  3. Lab of conservation and restoration of paper collections of CNEA: gamma radiation treatment of books and documents affected by microorganisms

    Alfaro, Laura; Miranda, Maria V.; Gonzalez, Maria E.; Calvo, Ana M.

    2009-01-01

    In 2005 the CNEA's Laboratory of Conservation and Restoration of Paper Collections was inaugurated at the Ezeiza Atomic Centre. This lab takes advantage of the experience of CNEA in the utilization of the biocide effects of gamma radiation for decontamination and sterilization of different products, mainly medical products. In recent years the application of gamma radiation to the other goods was explored. Gamma radiation can be utilized for disinfection in the case of biological contamination, such as contamination of books and documents by fungi or insects, and in the case of some disasters (inundation or fire controlled with water in libraries and archives) to prevent the growing of fungi and pathogenic bacteria. (author) [es

  4. Towards a strategic line of intellectual capital development for CNEA (Comision Nacional de Energia Atomica de Argentina)

    Lopez, M.P.; Martinez Demarco, S.; Sbaffoni, Monica; Harriague, Santiago

    2009-01-01

    After an extended stagnation period, during which there was a big staff reduction in the nuclear sector in general and in CNEA in particular, with no new personnel hired, ageing staff and risk of skills and knowledge loss, in 2006 the Argentinean government launched a nuclear power programme based on the necessity of expanding the national energy matrix and taking into account the general concerns about greenhouse effects. The new projects drove to CNEA to the elaboration of a ten year Strategic Plan for CNEA, which includes the activities to be performed during the period 2009-2018. Conceived with wide participation of internal areas, the definition of the strategic plan included objectives, goals, management indicators, and periodical revisions. The Intellectual Capital being a fundamental asset to reach the goals, a chapter on these subject was included, for every knowledge domain. Even if the work is still in progress, partial results and tendencies can be shown. Every area of the organization is working on the analysis of their own strengths and weaknesses in terms of intellectual capital, knowledge loss risk analysis, and definition of future needs in terms of knowledge and skills. Analyzing strengths and weaknesses, there appeared common elements to most of the areas, indicating that besides the use of specific knowledge management, education and training tools, a Strategic Line for Intellectual Capital Development should be quickly implemented, to fill in gaps and protect the current knowledge asset. This presentation summarizes the work done up to now, showing tendencies in the situation, and proposing a strategic line for intellectual capital development, to help solving major staffing problems in CNEA. (author)

  5. Staff Report to the Senior Department Official on Recognition Compliance Issues. Recommendation Page: National Accrediting Commission Of Cosmetology Arts and Sciences

    US Department of Education, 2010

    2010-01-01

    The National Accrediting Commission of Cosmetology Arts and Sciences (NACCAS) is a national accreditor whose scope of recognition is for the accreditation throughout the United States of postsecondary schools and departments of cosmetology arts and sciences and massage therapy. The agency accredits approximately 1,300 institutions offering…

  6. The Australian Atomic Energy Commission: A case study in Australian science and government

    Moyal, A.M.

    1975-01-01

    No major scientific body in Australia has evoked as much questioning, criticism and speculation as the Australian Atomic Energy Commission, which was established in 1953 and which, 21 years later, still stands poised on the threshold of bringing Australia into the nuclear age. It is argued that the AAEC has not consolidated the goals and purposes which were set for it over two decades ago. This study attempts to answer the following questions: 1) Is the AAEC a viable institution or is it a white elephant; 2) Has it a rationale and a future in the present age; 3) Has it been accountable or has it evolved, expanded, reorganised, changed direction, consumed funds, used and produced talent, and ultimately marked time behind closed political and administrative doors; 4) Why have its work, its accomplishments and failures not been subjected to public scrutiny. (author)

  7. Australian Atomic Energy Commission: A case study in Australian science and government

    Moyal, A M [New South Wales Inst. of Tech., Broadway (Australia)

    1975-09-01

    No major scientific body in Australia has evoked as much questioning, criticism and speculation as the Australian Atomic Energy Commission, which was established in 1953 and which, 21 years later, still stands poised on the threshold of bringing Australia into the nuclear age. It is argued that the AAEC has not consolidated the goals and purposes which were set for it over two decades ago. This study attempts to answer the following questions: 1) Is the AAEC a viable institution or is it a white elephant; 2) Has it a rationale and a future in the present age; 3) Has it been accountable or has it evolved, expanded, reorganised, changed direction, consumed funds, used and produced talent, and ultimately marked time behind closed political and administrative doors; 4) Why have its work, its accomplishments and failures not been subjected to public scrutiny.

  8. Validation of Neutron Calculation Codes and Models by means of benchmark cases in the frame of the Binational Commission of Nuclear Energy. Probabilistic Models

    Dos Santos, Adimir; Siqueira, Paulo de Tarso D.; Andrade e Silva, Graciete Simões; Grant, Carlos; Tarazaga, Ariel E.; Barberis, Claudia

    2013-01-01

    In year 2008 the Atomic Energy National Commission (CNEA) of Argentina, and the Brazilian Institute of Energetic and Nuclear Research (IPEN), under the frame of Nuclear Energy Argentine Brazilian Agreement (COBEN), among many others, included the project “Validation and Verification of Calculation Methods used for Research and Experimental Reactors . At this time, it was established that the validation was to be performed with models implemented in the deterministic codes HUEMUL and PUMA (cell and reactor codes) developed by CNEA and those ones implemented in MCNP by CNEA and IPEN. The necessary data for these validations would correspond to theoretical-experimental reference cases in the research reactor IPEN/MB-01 located in São Paulo, Brazil. The staff of the group Reactor and Nuclear Power Studies (SERC) of CNEA, from the argentine side, performed calculations with deterministic models (HUEMUL-PUMA) and probabilistic methods (MCNP) modeling a great number of physical situations of de reactor, which previously have been studied and modeled by members of the Center of Nuclear Engineering of the IPEN, whose results were extensively provided to CNEA. In this paper results of comparison of calculated and experimental results for critical configurations, temperature coefficients, kinetic parameters and fission rates evaluated with probabilistic models spatial distributions are shown. (author)

  9. Validation of Neutron Calculation Codes and Models by means of benchmark cases in the frame of the Binational Commission of Nuclear Energy. Criticality Experiments

    Dos Santos, Adimir; Siqueira, Paulo de Tarso D.; Andrade e Silva, Graciete Simões; Grant, Carlos; Tarazaga, Ariel E.; Barberis, Claudia

    2013-01-01

    In year 2008 the Atomic Energy National Commission (CNEA) of Argentina, and the Brazilian Institute of Energetic and Nuclear Research (IPEN), under the frame of Nuclear Energy Argentine Brazilian Agreement (COBEN), among many others, included the project “Validation and Verification of Calculation Methods used for Research and Experimental Reactors . At this time, it was established that the validation was to be performed with models implemented in the deterministic codes HUEMUL and PUMA (cell and reactor codes) developed by CNEA and those ones implemented in MCNP by CNEA and IPEN. The necessary data for these validations would correspond to theoretical-experimental reference cases in the research reactor IPEN/MB-01 located in São Paulo, Brazil. The staff of the group Reactor and Nuclear Power Studies (SERC) of CNEA, from the argentine side, performed calculations with deterministic models (HUEMUL-PUMA) and probabilistic methods (MCNP) modeling a great number of physical situations of de reactor, which previously have been studied and modeled by members of the Center of Nuclear Engineering of the IPEN, whose results were extensively provided to CNEA. In this paper results for critical configurations are shown. (author)

  10. CNEA/ANL collaboration program to develop an optimized version of DART validation and assessment by means of U3 Six and U3 O8-Al dispersed CNEA mini plate irradiation behavior

    Solis, Diego; Taboada, Horacio; Rest, Jeffrey

    1998-01-01

    The DART code is based upon a thermochemical model that can predict swelling, recrystallization, fuel-meat interdiffusion and other issues related with MTR dispersed FE behavior under irradiation. As a part of a common effort to develop an optimized version of DART, a comparison between DART predictions and CNEA miniplates irradiation experimental data was made. The irradiation took place during 1981-82 for U3O8 miniplates and 1985-86 for U 3 Si x at Oak Ridge Research Reactor. (author)

  11. Project Solaris, a Global Network of Autonomous Observatories: Design, Commissioning, and First Science Results

    Kozłowski, S. K.; Sybilski, P. W.; Konacki, M.; Pawłaszek, R. K.; Ratajczak, M.; Hełminiak, K. G.; Litwicki, M.

    2017-10-01

    We present the design and commissioning of Project Solaris, a global network of autonomous observatories. Solaris is a Polish scientific undertaking aimed at the detection and characterization of circumbinary exoplanets and eclipsing binary stars. To accomplish this, a network of four fully autonomous observatories has been deployed in the Southern Hemisphere: Solaris-1 and Solaris-2 in the South African Astronomical Observatory in South Africa; Solaris-3 in Siding Spring Observatory in Australia; and Solaris-4 in Complejo Astronomico El Leoncito in Argentina. The four stations are nearly identical and are equipped with 0.5-m Ritchey-Crétien (f/15) or Cassegrain (f/9, Solaris-3) optics and high-grade 2 K × 2 K CCD cameras with Johnson and Sloan filter sets. We present the design and implementation of low-level security; data logging and notification systems; weather monitoring components; all-sky vision system, surveillance system; and distributed temperature and humidity sensors. We describe dedicated grounding and lighting protection system design and robust fiber data transfer interfaces in electrically demanding conditions. We discuss the outcomes of our design, as well as the resulting software engineering requirements. We describe our system’s engineering approach to achieve the required level of autonomy, the architecture of the custom high-level industry-grade software that has been designed and implemented specifically for the use of the network. We present the actual status of the project and first photometric results; these include data and models of already studied systems for benchmarking purposes (Wasp-4b, Wasp-64b, and Wasp-98b transits, PG 1663-018, an eclipsing binary with a pulsator) as well J024946-3825.6, an interesting low-mass binary system for which a complete model is provided for the first time.

  12. Validation of Neutron Calculation Codes and Models by means of benchmark cases in the frame of the Binational Commission of Nuclear Energy. Kinetic Parameters, Temperature Coefficients and Power Distribution

    Dos Santos, Adimir; Siqueira, Paulo de Tarso D.; Andrade e Silva, Graciete Simões; Grant, Carlos; Tarazaga, Ariel E.; Barberis, Claudia

    2013-01-01

    In year 2008 the Atomic Energy National Commission (CNEA) of Argentina, and the Brazilian Institute of Energetic and Nuclear Research (IPEN), under the frame of Nuclear Energy Argentine Brazilian Agreement (COBEN), among many others, included the project “Validation and Verification of Calculation Methods used for Research and Experimental Reactors . At this time, it was established that the validation was to be performed with models implemented in the deterministic codes HUEMUL and PUMA (cell and reactor codes) developed by CNEA and those ones implemented in MCNP by CNEA and IPEN. The necessary data for these validations would correspond to theoretical-experimental reference cases in the research reactor IPEN/MB-01 located in São Paulo, Brazil. The staff of the group Reactor and Nuclear Power Studies (SERC) of CNEA, from the argentine side, performed calculations with deterministic models (HUEMUL-PUMA) and probabilistic methods (MCNP) modeling a great number of physical situations of de reactor, which previously have been studied and modeled by members of the Center of Nuclear Engineering of the IPEN, whose results were extensively provided to CNEA. In this paper results of comparison of calculated and experimental results for temperature coefficients, kinetic parameters and fission rates spatial distributions are shown. (author)

  13. History of the libraries of the National Atomic Energy Commission. Part 1

    Alcon, Susana J.; Puglia, Gabriela; Chavez, Alejandra T.

    2004-01-01

    The paper is a historical overview of the libraries of the National Atomic Energy Commission (CNEA) of Argentina and covers the period between 1952-1988. The libraries that have been created and organized as a support for the CNEA staff to meet the information requirements on nuclear subjects, extended their services to the whole scientific and technological community in Argentina and in the Latin America Region. They have an important volume of documents and have been able to fulfill the needs of a demanding group of users because of the high level of its professional staff. The paper outlines the development of the collections, the technical processing methods and the services provided as well as information on the librarians that have been the heads of the libraries. (author)

  14. CNEA's (Comision Nacional de Energia Atomica) experience in the preparation of a national system for laboratory accreditation

    Piacquadio, N.H.; Palacios, T.A.; Casa, V.A.; Koll, J.H.

    1993-01-01

    Within the regional markets, as it is the case of MERCOSUR , the laboratories which are suppliers of test and calibration results, are mutually recognized through the National Accreditation Systems. In Argentina there is a project to create a Center for the Accreditation of Test Laboratories. CNEA, which is involved in the execution of large projects and has adopted quality assurance criteria for a long time, requires for internal and external laboratories to be qualified. At the beginning of this year, a Committee for the Qualification of Laboratories was created in the Research and Development and Fuel Cycle Areas. Its objective was planning, management of documents, coordination, evaluation and quantification of laboratories, according to national IRAM and international ISO standards. This paper analyzes the organization of the system and the methods to evaluate and qualify laboratories as a process of growing up leading to the future National Accreditation System. (author). 3 figs

  15. National Atomic Energy Commission. Decree No. 1540, August 30 1994

    1994-01-01

    One of the objectives of the reorganization process of Argentina's public sector was to transfer to the private sector some of the Nation's productive activities, including those concerning the nuclear field. As a consequence, by Decree No. 1540 of August 30, 1994, (B.O. 2-Dec-94), CNEA's functions were partially reorganized. According to Decree No. 1540, the National Atomic Energy Commission (CNEA) maintained the missions and functions established by Decree-Law No. 22.498/56, with the exception of the regulation and surveillance of nuclear activities and the nuclear power generation activities. For the fulfillment of these activities, both the National Board of Nuclear Regulation (Ente Nacional Regulador Nuclear - ENREN) and Nucleoelectrica Argentina S.A. (NASA), were created. The National Board of Nuclear Regulation (ENREN), as an autarchical entity reporting to the Presidency of the Nation, shall be administered by a Board of Directors and shall be responsible for surveying and controlling all nuclear activities, shall suggest regulations and standards to ensure radiological and nuclear safety, personal protection, a controlled use of nuclear materials, licensing and surveillance of nuclear installations, and compliance with international safeguards. Nucleoelectrica Argentina S.A. (NASA) shall be organised as a corporation, reporting to the Ministry of Economy and Public Works and Services (Ministerio de Economia y Obras y Servicios Publicos) who will approve its statures. NASA shall take care of nuclear power generation at the Atucha I and Embalse nuclear power plants, as well as the construction, start-up and operation of the Atucha II nuclear power plant. As far as royalties are concerned, the Decree obliges Nucleoelectrica Argentina S.A. to pay CNEA for the performance of research and development activities, and to the ENREN an yearly regulatory tax per megawatt of installed nuclear power generation capacity. Also, Nucleoelectrica Argentina S.A. is declared

  16. Chinese Commission of Science Technology and Industry for National Defense Senior Vice Minister CHEN Qiufa exchanging gifts at luncheon and signing the Guest Book on 1st November 2007 with CERN Director-General R. Aymar.

    Maximilien Brice

    2007-01-01

    Chinese Commission of Science Technology and Industry for National Defense Senior Vice Minister CHEN Qiufa exchanging gifts at luncheon and signing the Guest Book on 1st November 2007 with CERN Director-General R. Aymar.

  17. Commissioning MMS

    Wood, Paul; Gramling, Cheryl; Stone, John; Smith, Patrick; Reiter, Jenifer

    2016-01-01

    This paper discusses commissioning of NASAs Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  18. Sixth Semiannual Report of the Commission to the Congress: Atomic Energy and the Life Sciences, July 1949

    Lilienthal, David E.; Bacher, Robert F.; Pike, Sumner T.; Strauss, Lewis L.

    1949-07-01

    The document represents the sixth semiannual Atomic Energy Commission (AEC) report to Congress. The report sums up briefly the major developments in the national atomic energy program and further gives a comprehensive review of one of its major phases -- the biological and medical activities. It outlines the AEC program in all phases of medicine and biology, reviews research results and projects under way, reports what is known of the effects of radiation on man and other living things, and surveys the benefits which may be derived from the use of radiation for diagnosis and treatment of disease and for the study of plants and animals. Since radiation from atomic sources also is potentially harmful to all living things, the Commission has set up safeguards for all who might, without such protection, be exposed to harmful radiation.

  19. Commission 1

    state" to provide the Commission with information on the measures that they have ...... policies and identify the gaps in ensuring the full realisation of socio- economic .... Boulle L, Harris Band Hoexter C Constitutional and Administrative Law.

  20. Joint Commission

    ... for the latest publication of The Joint Commission Journal on Quality and Patient Safety (JQPS). . How We Work Process improvement program breeds quality culture, empowers staff An article in Quality Progress, June ...

  1. RP-10: commissioning. Reproduction by physical experiences calculation

    Higa, Manabu; Madariaga, M.R.

    1990-01-01

    This work presents the neutronic calculation results, most of which were carried out after such experiences, to verify the calculation methodology developed at the Analysis and Calculation Department of the National Atomic Energy Commission (CNEA). The results obtained were satisfactory, proving that the calculation methodology used is adequate for the design of this type of reactors. The only important disagreement is to evaluate the reactivity excess and cut reactivity, but this responds to a criterion difference and/or that of definition for these parameters. The positions of criticality with errors lower than 100 pcm were predicted. The differential and integral reactivities for the calibration of bars, as well as the flux distribution, are reproduced in a reasonable degree in relation to differences inferior to 10%. (Author) [es

  2. Annotated Bibliography of Textbooks and Reference Materials in Marine Sciences. Provisional Edition. Intergovernmental Oceanographic Commission, Technical Series.

    United Nations Educational, Scientific, and Cultural Organization, Paris (France). Intergovernmental Oceanographic Commission.

    Presented is an annotated bibliography based on selected materials from a preliminary survey of existing bibliographies, publishers' listings, and other sources. It is intended to serve educators and researchers, especially those in countries where marine sciences are just developing. One hundred annotated and 450 non-annotated entries are…

  3. Estimates of the commission on ecological situation around the enterprise Mayak of the USSR Minatomenergoprom that was organized by the Presidium of the USSR Academy of Sciences No. 1140-501, June 12 1990

    Bol'shakov, V.N.; Aleksakhin, R.M.; Bol'shov, L.A.; Kochetkov, L.A.; Tsyb, A.F.; Chukanov, V.N.; Petukhov, V.I.

    1991-01-01

    Experts commission of the USSR Academy of Sciences under supervision of a Soviet academician V.N.Bol'shakov revealed crisis ecological situation created in the basin if the Techa river by the operation of the industrial plant Mayak. Although the experts commission results were not complete and many aspect of radioecological safety escaped the experts attention the given data on contamination of the region and human populations reflect the truthful crisis situation in the region of the industrial plant Mayak

  4. Experiments in progress: The geography of science in the Atomic Energy Commission's peaceful uses of nuclear explosives program, 1956-1973

    Kirsch, Scott Lawrence

    From 1957 to 1973, the United States Atomic Energy Commission (AEC) actively pursued the "peaceful uses of nuclear explosives" through Project Plowshare. Nuclear excavation, the detonation of shallowly buried hydrogen bombs for massive earthmoving projects like harbors and canals, was considered the most promising of the Plowshare applications, and for a time, the most economically and technically "feasible." With a basis in and contributing to theory in critical human geography and science studies, the purpose of this dissertation is to examine the collisions of science, ideology, and politics which kept Plowshare designs alive--but only as "experiments in progress." That is, this research asks how the experimental program persisted in places like the national weapons laboratory in Livermore, California, and how its ideas were tested at the nuclear test site in Nevada, yet Plowshare was kept out of those spaces beyond AEC control. Primary research focuses on AEC-related archival materials collected from the Department of Energy Coordination and Information Center, Las Vegas, Nevada, and from the Lawrence Livermore National Laboratory, as well as the public discourse through which support for and opposition to Plowshare projects was voiced. Through critical analysis of Plowshare's grandiose "geographical engineering" schemes, I thus examine the complex relations between the social construction of science and technology, on one hand, and the social production of space, on the other.

  5. Plantear utopías: La formación de la comunidad científica: CNEA (1950-1955

    Zulema Marzorati

    2003-12-01

    Full Text Available En 1950 se creó en la Argentina la Comisión Nacional de Energía Atómica. En ella se fue conformando una comunidad científica que luego de su participación en la Primera Conferencia "Átomos para la Paz" realizada en Ginebra en 1955, fue reconocida por sus pares a nivel internacional. Nuestro objetivo es analizar el desarrollo científico-tecnológico alcanzado en la CNEA por ese conjunto de científicos durante su etapa inicial. En la investigación, además de la utilización de fuentes escritas convencionales y bibliografía, se han realizado entrevistas a científicos nucleares que actuaron en ese período, con la intención de obtener una mayor comprensión sobre las prácticas de los actores sociales y acerca de la relación entre el contexto histórico y la institución.The International Board of Atomic Energy (Comisión Nacional de Energía Atómica - CNEA was created in 1950. In this way a scientific community was established in it. After its participation in The First International Conference "Atoms for Peace" which was held in Geneva in 1955, this scientific community was acknowledged by its peers all over the world. Our aim is to analyze the scientific- technological development achieved by those scientists in the CNEA in its early stages. This investigation has developed conventional written resources, compiled bibliography and has interviewed some nuclear scientists who worked in that period, to achieve a better understanding of the social actors' practice and about the relation between the historical context and the institution.

  6. Commissioning and start-up of RA-8 critical assembly

    Lorenzo, N. de; Diaz, C.; Facchini, G.; Fernandez, C.; Fittipaldi, A.; Juracich, R.; Levanon, I.; Manceda, J.; Martinez, J.; Mogdan, R.; Perez, J.; Scarnichia, E.; Blaumann, H.; Gennuso, G.; Scotti, G.

    1999-01-01

    The RA-8 critical assembly was designed as one of the experimental facilities for the CAREM Reactor Project. This paper describes the activities developed during the cold and hot commissioning, pointing out the difficulties and the solutions applied (some of them original ones). Moreover, this paper will show the main features of the newest nuclear installation of CNEA making a brief description of its characteristics. Among the special circumstances related to the commissioning that are described in the paper we can mention the following: 1. The facility shares the building with the Thermohydraulic Assay Laboratory (L.E.T.), another experimental facility of CAREM, and thus some shared systems have already been working for many years before this start up. Special procedures for these systems were designed to verify the proper functioning under the new requirements. 2. A new driving mechanism, based in hydraulic cylinders, was used to move the control rods. The criteria for acceptance and a validation of the procedure completeness have been carried out. 3. The implementation of a power measurement system based in neutron noise. 4. Measurement of Power Distribution using direct gamma counting from the fuel elements. 5. The commissioning was interrupted for a ten-month period because the personnel involved had to carry out the commissioning of the Egyptian Research Reactor 2. Also, the common activities during a commissioning are described, pointing out the major steps carried out and the results obtained. The following are examples of these activities: 1. Environmental dose survey (before fuel loading and during other stages). 2. Test of equipment and systems isolated from the rest of the plant. 3. Integrated system test (two or more systems working at the same time). 4. Start-up and power operation simulations before fuel loading. 5. Fuel loading strategy during the approximation to criticality by mass. 6. Modification of systems' components to improve the

  7. 8 May 2014 - W. Watson-Wright, Assistant Director General and Executive Secretary UNESCO Intergovernmental Oceanographic Commission Assistant Director-General for the Natural Sciences Sector ad interim visiting the CMS cavern with CMS Collaboration Deputy Spkokesperson K. Borras. Adviser to the Director-General, in charge of Relations with International Organisations M. Bona present throughout.

    Brice, Maximilien

    2014-01-01

    Ms Wendy Watson-Wright Assistant Director General and Executive Secretary UNESCO Intergovernmental Oceanographic Commission Assistant Director-General for the Natural Sciences Sector ad interim UNESCO

  8. Production of kits for the labelling with 113sup(m)In and sup(99m)Tc, at the CNEA

    Palcos, M.C.; Kurcbart, Horacio; Nowotny, G.; Ramos, Elsa; Riesgo, J.G.; Mitta, A.E.A.

    1978-05-01

    The actual state of the production of radiopharmaceuticals in the form of reagents kits at the C.N.E.A. is described. This could allow the users to label compounds with sup(113m)In and sup(99m)Tc in an easy and reproducible way. At present, the following sets are provided routinarily a) To label with sup(99m)Tc: Albumin macroaggregates: calcium gluconate; antimonium sulfide colloid, sodium phytate; sodium calcium DTPA; seroalbumin; sodium pyrophosphate; sodium citrate. b) To label with sup(113m)In: albumin macroaggregates; PVP-bicarbonate; DTPA; human seroalbumin. Regarding products in a developping stage, we have: to labed with sup(99m)Tc: dimercapto-succinic acid, set for the labelling of human erythrocytes, set for sup(113m)In and sup(99m)Tc concentration and bleomicin; to label with sup(113m)In: EDTMP sup(99m)In. (author) [es

  9. Program description for the qualification of CNEA - Argentina as a supplier of LEU silicide fuel and post-irradiation examinations plan for the first prototype irradiated in Argentina

    Rugirello, Gabriel; Adelfang, Pablo; Denis, Alicia; Zawerucha, Andres; Marco, Agustin di; Guillaume, Eduardo; Sbaffoni, Monica; Lacoste, Pablo

    1998-01-01

    In this report we present a description of the ongoing and future stages of the program for the qualification of CNEA, Argentina, as a supplier of low enriched uranium silicide fuel elements for research reactor. Particularly we will focus on the characteristics of the future irradiation experiment on a new detachable prototype, the post-irradiation examinations (PIE) plan for the already irradiated prototype PO4 and an overview of the recently implemented PIE facilities and equipment. The program is divided in several steps, some of which have been already completed. It concludes: development of the uranium silicide fissile material, irradiation and PIE of several full-scale prototypes. Important investments have been already carried out in the facilities for the FE production and PIE. (author)

  10. The projects for heavy water production of the Argentine National Atomic Energy Commission

    Garcia Bourg, J.M.; Garcia, E.E.

    1982-01-01

    The bases and scope of the projects for heavy water production that are being currently developed by the Argentine National Atomic Energy Commission (CNEA) are described. As an introduction, the following points are presented: a) the fundamentals of heavy water utilization in a nuclear reactor, with a mention of its properties and uses, b) a review of the physicochemical bases of the principal methods for heavy water production: chemical exchange (monothermal and bithermal processes), distillation and electrolysis, with tables summarizing the fundamental characteristics of the first two ones, and an evaluation of the different production methods from the viewpoint of their application in an industrial scale; and c) a synthetic information, in the form of tables, about the world's heavy water production. The subject of heavy water production in Argentina is treated in the principal section, describing the scope, location, main characteristics and chemical processes corresponding to the projects being developed by CNEA, which currently are the installation of an Industrial Plant in Arroyito (Province of Neuquen), purchased on a turnkey basis and using the NH 3 /H 2 isotopic exchange method; the installation of an Experimental Plant in Atucha (Province of Buenos Aires), for the development of the domestic technology of heavy-water production by the SH 2 /H 2 O isotopic exchange method, and the development of the engineering of an industrial plant (''Module 80''), based on the Experimental Plant's technology. (M.E.L.) [es

  11. Commission 4: Ephemerides

    Kaplan, George H.; Hohenkerk, Catherine Y.; Fukushima, Toshio; Arlot, Jean-Eudes; Bangert, John A.; Bell, Steven A.; Folkner, William M.; Lara, Martin; Pitjeva, Elena V.; Urban, Sean E.; Vondrák, Jan

    2012-04-01

    The Commission 4 Organizing Committee began its work for the 2009-2012 triennium by revising the commission's terms of reference, which serve as our ``mission statement.'' The new terms of reference are:(a)Maintain cooperation and collaboration between the national offices providing ephemerides, prediction of phenomena, astronomical reference data, and navigational almanacs.(b)Encourage agreement on the bases (reference systems, time scales, models, and constants) of astronomical ephemerides and reference data in the various countries. Promote improvements to the usability and accuracy of astronomical ephemerides, and provide information comparing computational methods, models, and results to ensure the accuracy of data provided.(c)Maintain databases, available on the Internet to the national ephemeris offices and qualified researchers, containing observations of all types on which the ephemerides are based. Promote the continued importance of observations needed to improve the ephemerides, and encourage prompt availability of these observations, especially those from space missions, to the science community.(d)Encourage the development of software and web sites that provide astronomical ephemerides, prediction of phenomena, and astronomical reference data to the scientific community and public.Promote the development of explanatory material that fosters better understanding of the use and bases of ephemerides and related data.

  12. National Knowledge Commission

    Pitroda, Sam

    2007-04-01

    India's National Knowledge Commission (NKC) established by the prime minister is focused on building institutions and infrastructure in Education, Science and Technology, Innovation etc. to meet the challenges of the knowledge economy in the 21st century and increase India's competitive advantage in the global market. India today stands poised to reap the benefits of a rapidly growing economy and a major demographic advantage, with 550 million young people below the age of 25 years, the largest in the world. The NKC is focused on five critical areas of knowledge related to access, concepts, creation, applications and services. This includes a variety of subject areas such as language, translations, libraries, networks, portals, affirmative action, distance learning, intellectual property, Entrepreneurship, application in Agriculture, health, small and medium scale industries, e-governance etc. One of the keys to this effort is to build a national broadband gigabit of networks of 500 nodes to connect universities, Libraries, Laboratories, Hospitals, Agriculture institutions etc. to share resources and collaborate on multidisciplinary activities. This presentation will introduce the NKC, discuss methodology, subject areas, specific recommendation and outline a plan to build knowledge networks and specifics on network architecture, applications, and utilities.

  13. Science in the Service of Occupational Health. The Case of the Commission for "Miner's Disease of Jáchymov" in the Inter-War Czechoslovakia.

    Mášová, H.; Těšínská, Emilie

    2006-01-01

    Roč. 107, č. 4 (2006), s. 447-460 ISSN 1214-6994. [Conference on Occupational Public Health. Lessons from the Past - Chalenges for the Future. Linköping-Norrköping, 03.09.2001-09.09.2001] Institutional research plan: CEZ:AV0Z80630520 Keywords : history of science - occupational health - Joachimsthal uranium mines Subject RIV: AB - History

  14. CNEA/ANL collaboration program to develop an optimized version of DART validation and assessment by means of U{sub 3}Si{sub x} and U{sub 3}O{sub 8-}Al dispersed CNEA miniplate irradiation behavior.

    Solis, D.

    1998-10-16

    The DART code is based upon a thermomechanical model that can predict swelling, recrystallization, fuel-meat interdiffusion and other issues related with MTR dispersed FE behavior under irradiation. As a part of a common effort to develop an optimized version of DART, a comparison between DART predictions and CNEA miniplates irradiation experimental data was made. The irradiation took place during 1981-82 for U3O8 miniplates and 1985-86 for U{sub 3}Si{sub x} at Oak Ridge Research Reactor (ORR). The microphotographs were studied by means of IMAWIN 3.0 Image Analysis Code and different fission gas bubbles distributions were obtained. Also it was possible to find and identify different morphologic zones. In both kinds of fuels, different phases were recognized, like particle peripheral zones with evidence of Al-U reaction, internal recrystallized zones and bubbles. A very good agreement between code prediction and irradiation results was found. The few discrepancies are due to local, fabrication and irradiation uncertainties, as the presence of U{sub 3}Si phase in U{sub 3}Si{sub 2} particles and effective burnup.

  15. Safe LHC beam commissioning

    Uythoven, J.; Schmidt, R.

    2007-01-01

    Due to the large amount of energy stored in magnets and beams, safety operation of the LHC is essential. The commissioning of the LHC machine protection system will be an integral part of the general LHC commissioning program. A brief overview of the LHC Machine Protection System will be given, identifying the main components: the Beam Interlock System, the Beam Dumping System, the Collimation System, the Beam Loss Monitoring System and the Quench Protection System. An outline is given of the commissioning strategy of these systems during the different commissioning phases of the LHC: without beam, injection and the different phases with stored beam depending on beam intensity and energy. (author)

  16. Regulatory Commission of Alaska

    Map Help Regulatory Commission of Alaska Login Forgot Password Arrow Image Forgot password? View Cart login Procedures for Requesting Login For Consumers General Information Telephone Electric Natural Gas

  17. Guidelines for residential commissioning

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-01-31

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify problems or to correct them. Residential commissioning is a solution to this problem. This guide is the culmination of a 30-month project that began in September 1999. The ultimate objective of the project is to increase the number of houses that undergo commissioning, which will improve the quality, comfort, and safety of homes for California citizens. The project goal is to lay the groundwork for a residential commissioning industry in California focused on end-use energy and non-energy issues. As such, we intend this guide to be a beginning and not an end. Our intent is that the guide will lead to the programmatic integration of commissioning with other building industry processes, which in turn will provide more value to a single site visit for people such as home energy auditors and raters, home inspectors, and building performance contractors. Project work to support the development of this guide includes: a literature review and annotated bibliography, which facilitates access to 469 documents related to residential commissioning published over the past 20 years (Wray et al. 2000), an analysis of the potential benefits one can realistically expect from commissioning new and existing California houses (Matson et al. 2002), and an assessment of 107 diagnostic tools for evaluating residential commissioning metrics (Wray et al. 2002). In this guide, we describe the issues that non-experts should consider in developing a commissioning program to achieve the benefits we have identified. We do this by providing specific recommendations about: how to structure the commissioning process, which diagnostics to use, and how to use them to commission new and existing houses. Using examples, we also demonstrate the potential benefits of applying the recommended whole-house commissioning approach to

  18. Commission on Legal Matters

    Staff Association

    2016-01-01

    What is a commission within the Staff Association (SA)? A commission is a working group of the CERN Staff Council, led by a staff representative. The commission is composed mainly of staff representatives, but interested members of the SA can apply to participate in the work of a commission. What is the commission on legal matters? The commission on legal matters works on texts governing the employment conditions of staff (Employed Members of Personnel and Associated Members of Personnel). This covers legal documents such as the Staff Rules and Regulations, administrative and operational circulars, as well as any other document relating to employment conditions. How is the work organised in this commission? The revision process of the text is generally done along following lines: The HR department, and its legal experts, proposes new texts or modifications to existing texts. A schedule for the study of these texts is established each year and this calendar by the commission to plan its work. The new or modi...

  19. The Lhc beam commissioning

    Redarelli, S.; Bailey, R.

    2008-01-01

    The plans for the Lhc proton beam commissioning are presented. A staged commissioning approach is proposed to satisfy the request of the Lhc experiments while minimizing the machine complexity in early commissioning phases. Machine protection and collimation aspects will be tackled progressively as the performance will be pushed to higher beam intensities. The key parameters are the number of bunches, k b , the proton intensity pe bunch, N, and the β in the various interaction points. All together these parameters determine the total beam power and the complexity of the machine. We will present the proposed trade off between the evolution of these parameters and the Lhc luminosity performance.

  20. The Danish Welfare Commission

    Gjerding, Allan Næs

    2006-01-01

    on public services, and install economic incentives for the behaviour of private households. The paper then digs into the proposals of the commission that are broadly grouped into five policy target areas con-cerning (1) the ageing of the population, (2) the incentives for labour market participation, (3......The paper deals with the main report of the Danish Welfare Commission and the one-hundred-and-nine proposals on the structure of the future Danish welfare state that the com-mission has put forward. Following upon a brief review of the discussion on the work of the Danish Welfare Commission......) competitiveness in the global economy, (4) behavioural regulation of the use of public bene-fits and services, and (5) management within tight budgets of an increasing demand on health and care. Finally, the concluding section sums up the discussion and elaborates on the debate on the Welfare Commission’s work...

  1. Commissioning for Humidified Buildings

    Deal, Brian

    1998-01-01

    .... Although proper commissioning procedures have been noted to reduce the potential for approximately 70 percent of these claims, no standards exist for the control of moisture migration in building...

  2. Nuclear Regulatory Commission Issuances

    NONE

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM).

  3. Nuclear Regulatory Commission issuances

    1993-08-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors; Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    1992-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    1991-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission Issuances

    1996-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    1991-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances

    1994-03-01

    This report includes the issuances received during the specified period from Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM).

  10. Nuclear Regulatory Commission issuances

    1991-11-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission Issuances

    1994-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission Issuance

    1994-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (AU), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission Issuances

    1994-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission issuances

    1991-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Production of irradiated bone derivatives for odontology and traumatology

    Martin, Hugo R.; Murature, D.A.

    2004-01-01

    In 2003, the National Atomic Energy Commission (CNEA), the Industrial Human Tissue Processing Plant of the Cordoba University and the Cordoba Science Agency analyzed the joint installation and operation of a Gamma Radiosterilization Module for the production of sterile human bone tissues as allografts for odontology and traumatology. The irradiation procedures were developed at the CNEA's Ezeiza Atomic Center. The irradiated bone tissues are being used in odontology with an excellent clinical behaviour. (author)

  16. Chinese Commission of Science Technology and Industry for National Defense Senior Vice Minister CHEN Qiufa visiting ALICE experiment on 1st November 2007 with CERN Director-General R. Aymar and Adviser J.-P. Revol. Thursday, 1st and Friday, 2nd November 2007

    Maximilien Brice

    2007-01-01

    Chinese Commission of Science Technology and Industry for National Defense Senior Vice Minister CHEN Qiufa visiting ALICE experiment on 1st November 2007 with CERN Director-General R. Aymar and Adviser J.-P. Revol. Thursday, 1st and Friday, 2nd November 2007

  17. Nuclear Regulatory Commission Issuances

    1992-01-01

    This is the thirty-sixth volume of issuances (1-396) of the Nuclear Regulatory Commission and its Atomic Safety and Licensing Boards, Administrative Law Judges, and Office Directors. It covers the period from July 1, 1992-December 31, 1992. Atomic Safety and Licensing Boards are authorized by Section 191 of the Atomic Energy Act of 1954. These Boards, comprised of three members conduct adjudicatory hearings on applications to construct and operate nuclear power plants and related facilities and issue initial decisions which, subject to internal review and appellate procedures, become the final Commission action with respect to those applications. Boards are drawn from the Atomic Safety and Licensing Board Panel, comprised of lawyers, nuclear physicists and engineers, environmentalists, chemists, and economists. The Atomic Energy Commission first established Licensing Boards in 1962 and the Panel in 1967

  18. Commissioning of ATLAS

    Thomas, J

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focussing on combined running and track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  19. ATF2 Commissioning

    Seryi, A.; /SLAC; Christian, G.; /KLTE-ATOMKI; Parker, B.; /BNL; Schulte, D.; Delahaye, J.-P.; Tomas, R.; Zimmermann, F.; /CERN; Wolski, A.; Elsen, E.; /Cockcroft Inst. /DESY; Sanuki, T.; /Tohoku U.; Gianfelice-Wendt, E.; Ross, M.; Wendt, M.; /Fermilab; Takahashi, T.; /Hiroshima U.; Bai, S.; Gao, J.; /Beijing, Inst. High Energy Phys.; Bolzon, B.; Geffroy, N.; Jeremie, A.; /Annecy, LAPP; Apsimon, R.; Burrows, P.; /Oxford U., JAI /Kyoto U., Inst. Chem. Res. /Kyungpook Natl. U. /Orsay, LAL /Phang Accelerator Lab /Royal Holloway, U. of London /SLAC /Daresbury /University Coll. London /Manchester U. /Univ. of Tokyo U.

    2009-10-30

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  20. ATF2 COMMISSIONING

    Seryi, A; Parker, B; Schulte, D; Delahaye, J P; Tomas, R; Zimmermann, F; Wolski, A; Elsen, E; Sanuki, T; Gianfelice-Wendt, E; Ross, M; Wendt, M; Takahashi, T; Bai, S; Gao, J; Bolzon, B; Geffroy, N; Jeremie, A; Apsimon, R; Burrows, P; Constance, B; Perry, C; Resta-Lopez, J; Swinson, C; Araki, S; Aryshev, A; Hayano, H; Honda, Y; Kubo, K; Kume, T; Kuroda, S; Masuzawa, M; Naito, T; Okugi, T; Sugahara, R; Tauchi, T; Terunuma, N; Urakawa, J; Yokoya, K; Iwashita, Y; Sugimoto, T; Heo, A Y; Kim, E S; Kim, H S; Bambade, P; Renier, Y; Rimbault, C; Huang, J Y; Kim, S H; Park, Y J; Hwang, W H; Blair, G; Boogert, S; Karataev, P; Molloy, S; Amann, J; Bellomo, P; Lam, B; McCormick, D; Nelson, J; Paterson, E; Pivi, M; Raubenheimer, T; Spencer, C; Wang, M H; White, G; Wittmer, W; Woodley, M; Yan, Y; Zhou, F; Angal-Kalinin, D; Jones, J; Lyapin, A; Scarfe, A; Kamiya, Y; Komamiya, S; Oroku, M; Suehara, T; Yamanaka, T

    2010-01-01

    ATF2 is a final-focus test beam line that aims to focus the low-emittance beam from the ATF damping ring to a beam size of about 37 nm, and at the same time to demonstrate nm beam stability, using numerous advanced beam diagnostics and feedback tools. The construction has been finished at the end of 2008 and the beam commissioning of ATF2 has started in December of 2008. ATF2 is constructed and commissioned by ATF international collaborations with strong US, Asian and European participation.

  1. 76 FR 21369 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    2011-04-15

    ... technological advances; examine diverse perspectives and possibilities for useful international collaboration on... emerging research in biomedicine and related areas of science and technology. The Commission is charged to... research, healthcare delivery, and technological innovation. In undertaking these duties, the Commission...

  2. Atomic energy and science disclosure in Cordoba

    Martin, Hugo R.

    2011-01-01

    In September 2009, considering the existing interest in public communication of scientific activities that are developed locally, a group of researchers and communicators from Córdoba, decided to form the Network of Outreach of Córdoba. Its stated objectives of the Constitutive Act are presented in this paper along with the main activities undertaken to date and plans for the future. Since that time, the Management of Institutional Relations of the CNEA in Córdoba became involved in public circulation of scientific knowledge, in what has proven to be a framework that ensures an adequate level of debate to present nuclear national activities. This will involve collaborative efforts with professional institutions involved in research, teaching and communicating science. The main objective was to encourage the transfer of knowledge to optimize available resources, improving the methodological approaches and generating creative products tailored to regional needs, in order to promote the democratization of science and nuclear technology. This paper consists of two parts. On the one hand describes the activities of the Network during the year 2011 shows results with particular emphasis on topics related to atomic energy, and secondly, shows the desirability of promoting such activities in the CNEA. Among the main actions considered, highlighting the institutional participation in the official Ministry of Science and Technology Fair participation in Science and Technology Provincial Cordoba 2011, issue of the radio program 'Green Light: Science and technology everyday life' by National Technological University Radio and a network of forty provincial stations, and active participation in the Course of Specialization in Public Communication of Science and Scientific Journalism, organized by the School of Information Sciences and the Faculty of Mathematics, Physics and Astronomy, National University of Cordoba, among others. (author) [es

  3. 78 FR 32295 - Commission Meeting

    2013-05-29

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: June 20...

  4. 77 FR 10599 - Commission Meeting

    2012-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 15...

  5. 78 FR 12412 - Commission Meeting

    2013-02-22

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: March 21...

  6. 77 FR 28420 - Commission Meeting

    2012-05-14

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: June 7, 2012, at 9...

  7. 78 FR 52601 - Commission Meeting

    2013-08-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: September 19, 2013...

  8. 77 FR 70204 - Commission Meeting

    2012-11-23

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the SUPPLEMENTARY INFORMATION section of this notice. DATES: December 14, 2012...

  9. 78 FR 69517 - Commission Meeting

    2013-11-19

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... meeting are contained in the Supplementary Information section of this notice. DATES: December 12, 2013...

  10. 77 FR 52106 - Commission Meeting

    2012-08-28

    ... SUSQUEHANNA RIVER BASIN COMMISSION Commission Meeting AGENCY: Susquehanna River Basin Commission. ACTION: Notice. SUMMARY: The Susquehanna River Basin Commission will hold its regular business meeting on... business meeting are contained in the Supplementary Information section of this notice. DATES: September 20...

  11. Nuclear regulatory commission issuances

    1989-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    1982-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  13. Nuclear Regulatory Commission issuances

    1986-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission Issuances

    1994-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  15. Nuclear Regulatory Commission issuances

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  16. Nuclear Regulatory Commission issuances

    1991-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    1989-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Danials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances

    1989-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission issuances

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    1990-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    1991-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances

    1982-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  4. Nuclear Regulatory Commission issuances

    1987-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    1988-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    1989-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear regulatory commission issuances

    1990-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances

    1997-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  9. DESY: HERA commissioning

    Anon.

    1992-01-01

    The commissioning of the world's first electron-proton collider - the 6.3 kilometre HERA ring at the DESY Laboratory in Hamburg - last year was the result of more than a decade of careful planning, design and construction

  10. Nuclear Regulatory Commission Issuances

    1986-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances

    1991-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances

    1988-01-01

    This report includes the issuance received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances

    NONE

    1997-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance.

  14. Nuclear Regulatory Commission Issuances

    1988-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances

    1988-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances

    1990-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Nuclear Regulatory Commission issuances

    1988-06-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  19. Nuclear Regulatory Commission Issuances

    1981-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances

    1987-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances

    1982-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking

  2. Nuclear Regulatory Commission issuances

    1990-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety And Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances

    1985-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission issuances

    1990-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  5. Nuclear Regulatory Commission issuances

    1982-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Commissioning of the LHC

    CERN. Geneva

    2007-01-01

    The LHC construction is now approaching the end and it is now time to prepare for commissioning with beam. The behavior of a proton storage ring is much different to that of LEP, which profited from strong radiation damping to keep the beam stable. Our last experience with a hadron collider at CERN goes back more than 15 years when the proton-antiproton collider last operated. Ppbar taught us a lot about the machine physics of bunched beam proton storage rings and was essential input for the design of the LHC. After a short presentation of where we stand today with machine installation and hardware commissioning, I will discuss the main machine physics issues that will have to be dealt with in the LHC.

  8. Nuclear Regulatory Commission issuances

    1982-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions For Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  9. Nuclear Regulatory Commission issuances

    1989-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety nd Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or have any independent legal significance

  10. Nuclear Regulatory Commission issuances

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors' Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services

  11. Nuclear Regulatory Commission issuances

    NONE

    1996-04-01

    This report includes the issuances received during the April 1996 reporting period from the Commission, the Atomic Safety and Licensing Boards, the Administrative Law Judges, the Directors` Decisions, and the Decisions on Petitions for Rulemaking. Included are issuances pertaining to: (1) Yankee Nuclear Power Station, (2) Georgia Tech Research Reactor, (3) River Bend Station, (4) Millstone Unit 1, (5) Thermo-Lag fire barrier material, and (6) Louisiana Energy Services.

  12. BROOKHAVEN: Booster commissioned

    Bleser, Ed

    1992-03-15

    The construction and first commissioning phase of the Booster synchrotron to inject into Brookhaven's veteran Alternating Gradient Synchrotron (AGS) were completed last year. Scheduled to come into operation this year, the new Booster will extend the research capabilities AGS, and with its ability to accelerate partially stripped heavy ions will play an essential role in the chain of accelerators serving the Relativistic Heavy Ion Collider (RHIC)

  13. Reading comprehension as an alternative tool for teaching science and nuclear technology

    Martin, H. R.

    2013-01-01

    In recent decades, the vast amount of information originated in the production of knowledge and its applications, has highlighted the importance of being independent readers, critics, and able to interpret written material circulating referred to scientific and technological issues, that invade the people's daily life. Moreover, in the last stage of education system of all future citizens of the country, the results of many diagnoses have highlighted the difficulties of young students to understand the texts related to science and technology. However, simultaneously with these weaknesses, students permanently express the need to relate science and technology to everyday life, and are interested in the discussion of the news related to atomic energy spread by the mass media. This duality lack of interest in reading vs interest in knowledge in certain subjects, is what has been taken into account when proposing this pedagogical approach that simultaneously involves several aspects. From the need to find a trigger for the treatment of a particular issue, to familiarization of students with the vocabulary and methodology of science ill the debate on the characteristics of specific technological applications of nuclear technology. Considering particularly the last of these factors, since 2011 has been developed in Jose Maria Paz School of Cordoba, Reading Comprehension Experience, using texts with scientific and technological contents published by Institute for Energy and Development (IEDS) of the National Atomic Energy Commission (CNEA) in Knowledge Leaves Series, as a methodological tool, to bring students to the physics of the atom and matter. The reading strategy used is based on the hypothesis of the type of questions being asked about the contents, can help students to develop reading strategies for comprehension and thus contribute positively to his learning. With this proposal it has been observed an increased on student interest in learning natural science

  14. Commission on Social Security

    Staff Association

    2010-01-01

    A commission studying past, present, and future social stakes ! For many years we have been hearing about the problems of funding of health insurance benefits in our different Member States. At CERN we are not totally immune from this problem.  To start with, let us recall that we have a mutual-benefit scheme which covers everyone for the consequences of the uncertainties in life (illness and accidents). The rules of our scheme are established by CERN in the framework of a sub-group of the Standing Concertation Committee, the CERN Health Insurance Scheme Board (CHISB), which is also in charge of managing the scheme.  The work of the “ProtSoc” (Protection Sociale – Social Security) commission, as we like to call it at the Staff Association, is to help your representatives on the CHISB, by preparing together with them the subjects and positions to be put forward and defended. This commission, which groups together the staff delegates who wish to invest their ...

  15. Division V: Commission 42: Close Binaries

    Ribas, Ignasi; Richards, Mercedes T.; Rucinski, Slavek; Bradstreet, David H.; Harmanec, Petr; Kaluzny, Janusz; Mikolajewska, Joanna; Munari, Ulisse; Niarchos, Panagiotis; Olah, Katalin; Pribulla, Theodor; Scarfe, Colin D.; Torres, Guillermo

    2015-08-01

    Commission 42 (C42) co-organized, together with Commission 27 (C27) and Division V (Div V) as a whole, a full day of science and business sessions that were held on 24 August 2012. The program included time slots for discussion of business matters related to Div V, C27 and C42, and two sessions of 2 hours each devoted to science talks of interest to both C42 and C27. In addition, we had a joint session between Div IV and Div V motivated by the proposal to reformulate the division structure of the IAU and the possible merger of the two divisions into a new Div G. The current report gives an account of the matters discussed during the business session of C42.

  16. Viet Nam National Atomic Energy Commission

    1992-01-01

    Vietnam National Atomic Energy Commission (VINATOM) is a governmental body in charge of organizing and coordinating activities related to use of nuclear energy for peaceful purpose. VINATOM in structure consists of the Nuclear Research Institute (Dalat), the Institute of Nuclear Science and Technology (Hanoi), the Institute for Technology of Radioactive and Rare Elements (Hanoi), and the Centre for Nuclear Technique Application (Ho Chi Minh City). This catalogue introduces profiles of nuclear R and D activities under management by VINATOM. (N.H.A)

  17. Nuclear Regulatory Commission information digest

    1990-03-01

    The Nuclear Regulatory Commission information digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the commission. This is an annual publication for the general use of the NRC Staff and is available to the public. The digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  18. A Guide to Building Commissioning

    Baechler, Michael C.

    2011-09-01

    Commissioning is the process of verifying that a building's heating, ventilation, and air conditioning (HVAC) and lighting systems perform correctly and efficiently. Without commissioning, system and equipment problems can result in higher than necessary utility bills and unexpected and costly equipment repairs. This report reviews the benefits of commissioning, why it is a requirement for Leadership in Energy and Environmental Design (LEED) certification, and why building codes are gradually adopting commissioning activities into code.

  19. Discussion: European Commission policy

    Coldwell, R.

    1993-01-01

    This paper documents the debate which arose following two papers presented to a seminar run by the Centre for the Study of Regulated Industries, on 11th November 1992, on European Commission (EC) energy policies. The issues raised cover how an internal market for electricity and natural gas will be implemented under a proposed EC directive, bearing in mind the level of opposition from a number of Member States. How this Directive will apply to vertically integrated structures, such as Scottish Electricity Industry, is also considered. (UK)

  20. Commissioning of the SCT

    Hayward, Helen

    2010-01-01

    In September 2008, the large hadron collider (LHC) at CERN was switched on with successful tests of circulating beam in both directions of the ring. The ATLAS semiconductor tracker (SCT) has been installed in the ATLAS cavern since summer 2007 and then integrated with the rest of the ATLAS subdetectors, in preparation for this event. After the SCT was assembled on the surface, the process of being commissioned using cosmic ray events began, and continued after the SCT was installed in the cavern with the rest of the ATLAS detector. Performance results will be given for the recent cosmic runs.

  1. Atomic Energy Commission Act, 1963

    1963-01-01

    Promulgated in 1963, the Atomic Energy Commission Act (204) established and vested in the Ghana Atomic Energy Commission the sole responsibility for all matters relating to the peaceful uses of atomic energy in the country. Embodied in the Act are provisions relating to the powers, duties, rights and liabilities of the Commission. (EAA)

  2. Meeting of the Task Force 'Information Systems in Soil Science', Freising-Weihenstephan, March 20-21, 1986. - Joint meeting of the Commissions V and VI, Osnabrueck, February 17-18, 1987. - Joint meeting of the Commissions I and IV, Bayreuth, April 23-24, 1987. Papers. Treffen der Arbeitsgruppe Informationssysteme in der Bodenkunde, 20. und 21. Maerz 1986, Freising-Weihenstephan. - Gemeinsame Sitzung der Kommissionen V und VI, 17. und 18. Februar 1987, Osnabrueck. - Gemeinsame Sitzung der Kommissionen I und IV, 23. und 24. April 1987, Bayreuth. Referate

    1987-01-01

    This volume contains 9 contributions of the Task Force 'Information Systems in Soil Science' (meeting at Freising-Weihenstephan from March 20-21, 1986), 49 papers of Commissions V and VI (meeting at Osnabrueck from February 17-18, 1987), and 17 papers of Commissions I and IV (meeting at Bayreuth from April 23-24, 1987). From the subject areas 'Heavy Metal Pollution of Soils' and 'Land Revegetation after Construction of District Heat Pipelines', six contributions have been separately recorded in the ENERGY data base.

  3. Commissioning the GTA accelerator

    Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Bowling, S.; Brown, S.; Cole, R.; Gilpatrick, J.D.; Garnett, R.; Guy, F.W.; Ingalls, W.B.; Johnson, K.F.; Kerstiens, D.; Little, C.; Lohsen, R.A.; Lloyd, S.; Lysenko, W.P.; Mottershead, C.T.; Neuschaefer, G.; Power, J.; Rusthoi, D.P.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Connolly, R.; Weiss, R.; Saadatmand, K.

    1992-01-01

    The Ground Test Accelerator (GTA) is being used to resolve the physics and engineering issues related to accelerating, focusing, and steering a high-brightness, high-current H - beam and then neutralizing it. The goal is to produce a 24 MeV, 50 mA device with a 2% duty factor. Specific features of the GTA -- injector, beam optics, rf linac structures, diagnostics, control and rf power systems are described. The first four steps in commissioning have been completed. The RFQ predicted and measured performances are in good agreement; however, the transmission is lower than specifications. Input emittance is larger than design specifications and increases the effects of image charge and multipoles. Displacement of steering magnets in either the horizontal or vertical plane caused beam displacements in both planes. It is suspected that quadrupole rotation is the cause of the coupled motion. 9 figs., 5 tabs., 11 refs

  4. Safety Commission databases support

    Petit, S; CERN. Geneva. TS Department

    2005-01-01

    A collaboration project between the Safety Commission (SC) and the Controls, Safety and Engineering databases group (TS/CSE) started last year. The aim of this collaboration is to transfer several SC applications from their local environments onto the D7i-MTF EDMS framework, for which the TS/CSE group is responsible. Different domains of activity and projects have been defined in the areas of equipment management, safety inspections, accidents and risks management. Priorities have been established in collaboration with SC. This paper presents the new Safety Inspections Management system (SIM) which will be put in production before the summer 2005 and reviews the constraints of both the users and the development and operational framework that needed to be taken into account. The technical solutions adopted to assure a successful production start-up and operation of the SIM system are described. Progress on other on-going projects and plans for the next year are also reported.

  5. GP commissioning in England.

    Charlton, Rodger

    2013-02-01

    The NHS, yet again, is in transition with an emphasis on groups of general practitioners (GPs) (clinical commissioning groups) making decisions on which specialist services should be chosen for patients requiring referral from primary care. It is an area of new terminology with a new language and further change for all working in the NHS and the all-important interface between primary and secondary care, and its impact on teamwork. There are many drivers including choice, efficiency, franchising of services, coordination and leadership in an enormous organisation, but not least reducing costs and keeping to a budget. There are many logistical issues and ethical anxieties, and only time will inform patients, practitioners, stakeholders and politicians as to its success.

  6. SSCL Commissioning and Operations

    1992-01-01

    The SSC, with an energy of 20 TeV/Beam, requires a sequence of individual accelerators of increasing energy in the injector chain. These are the Linac, Low Energy Booster, Medium Energy Booster, and High Energy Booster. Each accelerator system must be completed in sequence in order to provide beam to the next higher energy accelerator. The collider itself is comprised of ten sectors, each of which in terms of superconducting magnet bending strength, is equivalent to two HEB injectors. The completion of all injectors and collider sectors is required before stored beams can circulate in preparation for colliding beam operation. Four experimental halls are planned for the detector systems. Each major detector will be assembled in one of the halls by a world-wide collaboration of scientists. In addition, above ground facilities provide shops and test facilities for accelerator technical systems, superconducting magnet and materials research and development, and for detector assembly and operations. The purpose of this report is to present a plan for the sequential commissioning and operation of these individual accelerators and other technical facilities of the SSC. A central objective of this plan is to describe the activities at the SSCL that are not included as part of the construction project TPC, even though they occur during the overall project construction time-frame. Examples of such activities include the operation of general laboratory facilities and services not specifically related to construction, the operating costs for the individual accelerators in the injector chain once these facilities have been commissioned, and the costs of SSCL physics research groups. The Department of Energy has provided the following decision with regard to these operations categories for the SSCL

  7. Commissioning of the laboratory of Atucha II NPP. Implementation and optimization of analytical techniques, quality aspects

    Schoenbrod, Betina; Quispe, Benjamin; Cattaneo, Alberto; Rodriguez, Ivanna; Chocron, Mauricio; Farias, Silvia

    2012-09-01

    Atucha II NPP is a Pressurized Vessel Heavy Water Reactor (PVHWR) of 740 MWe designed by SIEMENSKWU. After some years of delay, this NPP is in advanced construction state, being the beginning of commercial operation expected for 2013. Nucleoelectrica Argentina (N.A.S.A.) is the company in charge of the finalization of this project and the future operation of the plant. The Comision Nacional de Energia Atomica (C.N.E.A.) is the R and D nuclear institution in the country that, among many other topics, provides technical support to the stations. The Commissioning Chemistry Division of CNAII is in charge of the commissioning of the demineralization water plant and the organization of the chemical laboratory. The water plant started operating successfully in July 2010 and is providing the plant with nuclear grade purity water. Currently, in the conventional ('cold') laboratory several activities are taking place. On one hand, analytical techniques for the future operation of the plant are being tested and optimized. On the other hand, the laboratory is participating in the cleaning and conservation of the different components of the plant, providing technical support and the necessary analysis. To define the analytical techniques for the normal operation of the plant, the parameters to be measured and their range were established in the Chemistry Manual. The necessary equipment and reagents were bought. In this work, a summary of the analytical techniques that are being implemented and optimized is presented. Common anions (chloride, sulfate, fluoride, bromide and nitrate) are analyzed by ion chromatography. Cations, mainly sodium, are determined by absorption spectrometry. A UV-Vis spectrometer is used to determine silicates, iron, ammonia, DQO, total solids, true color and turbidity. TOC measurements are performed with a TOC analyzer. To optimize the methods, several parameters are evaluated: linearity, detection and quantification limits, precision and

  8. A Virtual Commissioning Learning Platform

    Mortensen, Steffen; Madsen, Ole

    2018-01-01

    The introduction of reconfigurable manufacturing systems (RMS), Industry 4.0 and the associated technologies requires the establishment of new competencies. Towards that goal, Aalborg University (AAU) has developed an Industry 4.0 learning factory, the AAU Smart Production Lab. The AAU Smart...... Production Lab integrates a number of Industry 4.0 technologies for learning and research purposes. One of the many techniques is virtual commissioning. Virtual commissioning uses a virtual plant model and real controllers (PLCs) enabling a full emulation of the manufacturing system for verification. Virtual...... commissioning can lower the commissioning time up to 63%, allowing faster time to market. However, virtual commission is still missing industrial impact one of the reasons being lack of competencies and integration experiences. The paper presents the setup of the virtual commissioning learning platform...

  9. Model Commissioning Plan and Guide Specifications

    NONE

    1997-03-01

    The objectives of Model Commissioning Plan and Guide Specifications are to ensure that the design team applies commissioning concepts to the design and prepares commissioning specifications and a commission plan for inclusion in the bid construction documents.

  10. A History of the Atomic Energy Commission

    Buck, Alice L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations.

  11. Canadian Nuclear Safety Commission's intern program

    Gilmour, P.E.

    2002-01-01

    The Intern Program was introduced at the Canadian Nuclear Safety Commission, Canada's Nuclear Regulator in response to the current competitive market for engineers and scientists and the CNSC's aging workforce. It is an entry level staff development program designed to recruit and train new engineering and science graduates to eventually regulate Canada's nuclear industry. The program provides meaningful work experience and exposes the interns to the general work activities of the Commission. It also provides them with a broad awareness of the regulatory issues in which the CNSC is involved. The intern program is a two-year program focusing on the operational areas and, more specifically, on the generalist functions of project officers. (author)

  12. History of the Atomic Energy Commission

    Buck, A.L.

    1983-07-01

    This pamphlet traces the history of the US Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946 to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  13. History of the Atomic Energy Commission

    Buck, A.L.

    1982-08-01

    This pamphlet traces the history of the Atomic Energy Commission's twenty-eight year stewardship of the Nation's nuclear energy program, from the signing of the Atomic Energy Act on August 1, 1946, to the signing of the Energy Reorganization Act on October 11, 1974. The Commission's early concentration on the military atom produced sophisticated nuclear weapons for the Nation's defense and made possible the creation of a fleet of nuclear submarines and surface ships. Extensive research in the nuclear sciences resulted in the widespread application of nuclear technology for scientific, medical and industrial purposes, while the passage of the Atomic Energy Act of 1954 made possible the development of a nuclear industry, and enabled the United States to share the new technology with other nations

  14. 75 FR 66378 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    2010-10-28

    ..., and social issues related to potential scientific and technological advances; examine diverse... to formulation of public policy with regard to this advancing science. The Commission also will... third meeting in November. At this meeting, the Commission will continue discussing the emerging science...

  15. 75 FR 52533 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    2010-08-26

    ... bioethical, legal, and social issues related to potential scientific and technological advances; examine... of public policy with regard to this advancing science. The Commission also will hear more from the... Science, The Presidential Commission for the Study of Bioethical Issues. ACTION: Notice of meeting...

  16. Liberalism, authority, and bioethics commissions.

    MacDougall, D Robert

    2013-12-01

    Bioethicists working on national ethics commissions frequently think of themselves as advisors to the government, but distance themselves from any claims to actual authority. Governments however may find it beneficial to appear to defer to the authority of these commissions when designing laws and policies, and might appoint such commissions for exactly this reason. Where does the authority for setting laws and policies come from? This question is best answered from within a normative political philosophy. This paper explains the locus of moral authority as understood within one family of normative political theories--liberal political theories--and argues that most major "liberal" commentators have understood both the source and scope of ethics commissions' authority in a manner at odds with liberalism, rightly interpreted. The author argues that reexamining the implications of liberalism for bioethics commissions would mean changing what are considered valid criticisms of such commissions and also changing the content of national bioethics commission mandates. The author concludes that bioethicists who participate in such commissions ought to carefully examine their own views about the normative limits of governmental authority because such limits have important implications for the contribution that bioethicists can legitimately make to government commissions.

  17. Commissioning of NSLS-II

    Willeke, F.

    2015-05-03

    NSLS-II, the new 3rd generation light source at BNL was designed for a brightness of 1022 photons s-1mm-2mrad-2 (0.1%BW)-1. It was constructed between 2009 and 2014. The storage ring was commissioned in April 2014 which was followed by insertion device and beamline commissioning in the fall of 2014. All ambitious design parameters of the facility have already been achieved except for commissioning the full beam intensity of 500mA which requires more RF installation. This paper reports on the results of commissioning.

  18. Commissioning the SNO+ Detector

    Caden, E.; Coulter, I.; SNO+ Collaboration

    2017-09-01

    SNO+ is a multipurpose liquid scintillator neutrino experiment based at SNOLAB in Sudbury, Ontario, Canada. The experiment’s main physics goal is a search for neutrinoless double beta decay in Tellurium-130, but SNO+ will also study low energy solar neutrinos, geo- and reactor-antineutrinos, among other topics. We are reusing much of the hardware from the original SNO experiment, but significant work has taken place to transform the heavy water detector into a liquid scintillator detector. We present upgrades and improvements to the read-out electronics and trigger system to handle the higher data rates expected by a scintillator experiment. We show the successful installation and testing of a hold-down rope net for the acrylic vessel to counter-act the buoyancy of organic liquid scintillator. We also describe the new scintillator process plant and cover gas systems that have been constructed to achieve the purification necessary to meet our physics goals. We are currently commissioning the experiment with ultra-pure water in preparation for filling with scintillator in early 2017 and present the current status of this work.

  19. Post commissioning noise study

    Heraud, P.

    2008-01-01

    This presentation described a wind farm post-commissioning study conducted at a wind farm owned by Helimax Energy Inc. The farm was located in a partly-forested, partly cultivated region in Quebec that featured gently rolling hills. Over 600 dwellings were located within 2 km of the wind farm, and 44 dwellings were within the wind farm's boundaries. The noise impact assessments were conducted at various points near the wind farm. The wind farm was designed using an International Standards Organization (ISO) noise propagation model and a 40 dBA to provide adequate setbacks. The study was conducted using 10 days of continuous measurements at selected points of a wind farm. Points of reception included points from 650 m to 800 m. Noise over 2 km was not thought to be contributed by the wind turbine. The nearest dwelling was 512 m from one of the farm's wind turbines. The study also considered ground factor, temperature, relative humidity, and the height of the receptors. Quebec noise level limits are 40 dBA at night, and 45 dBA during the day. Noise level limits are independent of wind speed. Measured noise contributions over 40 dBA were not observed during the measurement program. The wind turbines were only audible for 1 night out of the 30 night study period. It was concluded that the ISO noise propagation model is a reliable tool for conducting noise impact assessments. tabs., figs

  20. LEIR commissioning successfully completed

    2006-01-01

    An important milestone has been passed in the preparation of the injector complex to supply ions to the LHC experiments. The LEIR lead-ion beam, seen on one of the control screens just before the PS injection region. The Low-Energy Ion Ring - LEIR for short - has passed its first tests with flying colours. On 12 May, the ring that will accumulate lead ions for the LHC was shut down after seven months of tests (see Bulletin 44/2005). 'The commissioning phase was a resounding success,' enthuses a satisfied Michel Chanel, head of the LEIR construction project. After several months of fine-tuning, the LEIR team has achieved its aim of producing the kind of beam required for first lead-ion collisions in the LHC in 2008. This involved creating bunches containing 230 million ions, in line with the specifications for those first beams. This success can be put down to the machine's outstanding design and components. 'It's a great achivement by all the teams involved in the machine's construction,' underlines Christian...

  1. ROS Installation and Commissioning

    Gorini, B

    The ATLAS Readout group (a sub-group of TDAQ) has now completed the installation and commissioning of all of the Readout System (ROS) units. Event data from ATLAS is initially handled by detector specific hardware and software, but following a Level 1 Accept the data passes from the detector specific Readout Drivers (RODs) to the ROS, the first stage of the central ATLAS DAQ. Within the final ATLAS TDAQ system the ROS stores the data and on request makes it available to the Level 2 Trigger (L2) processors and to the Event Builder (EB) as required. The ROS is implemented as a large number of PCs housing custom built cards (ROBINs) and running custom multi-threaded software. Each ROBIN card (shown below) contains buffer memories to store the data, plus a field programmable gate array ( FPGA ) and an embedded PowerPC processor for management of the memories and data requests, and is implemented as a 64-bit 66 MHz PCI card. Both the software and the ROBIN cards have been designed and developed by the Readout g...

  2. INFOBECA'97

    Alvarez, Gustavo A.

    1997-01-01

    The publication collects the progress reports of the works performed in 1997 at the Ezeiza Atomic Center in the framework of the fellowship program of the National Atomic Energy Commission (CNEA) of Argentina. The reports cover activities in radiopharmacy, isotope and radiation applications, life sciences, geology, waste management as well as material sciences

  3. science

    David Spurgeon

    Give us the tools: science and technology for development. Ottawa, ...... altered technical rela- tionships among the factors used in the process of production, and the en- .... to ourselves only the rights of audit and periodic substantive review." If a ...... and destroying scarce water reserves, recreational areas and a generally.

  4. Science/s.

    Emmanuelle Tricoire

    2005-03-01

    Full Text Available Un forum a été organisé en mars par la Commission européenne. Il s’appelait « Science in Society ». Depuis 2000 la Commission a mis en place un Plan d’Action élaboré pour que soit promue « la science » au sein du public, afin que les citoyens prennent de bonnes décisions, des décisions informées. Il s’agit donc de développer la réflexivité au sein de la société, pour que cette dernière agisse avec discernement dans un monde qu’elle travaille à rendre durable. ...

  5. Commission 31: Time

    Matsakis, Demetrios; Defraigne, Pascale; Hosokawa, M.; Leschiutta, S.; Petit, G.; Zhai, Z.-C.

    2007-03-01

    The most intensely discussed and controversial issue in time keeping has been the proposal before the International Telecommunications Union (ITU) to redefine Coordinated Universal Time (UTC) so as to replace leap seconds by leap hours. Should this proposal be adopted, the practice of inserting leap seconds would cease after a specific date. Should the Earth's rotation continue to de-accelerate at its historical rate, the next discontinuity in UTC would be an hour inserted several centuries from now. Advocates of this proposal cite the need to synchronize satellite and other systems, such as GPS, Galileo, and GLONASS, which did not exist and were not envisioned when the current system was adopted. They note that leap second insertions can be and have been incorrectly implemented or accounted for. Such errors have to date had localized impact, but they could cause serious mishaps involving loss of life. For example, some GPS receivers have been known to fail simply because there was no leap second after a long enough interval, other GPS receivers failed because the leap second information was broadcast more than three months in advance, and some commercial software used for internet time-transfer Network Time Protocol (NTP) could either discard all data received after a leap second or interpret it as a frequency change. The ambiguity associated with the extra second could also disrupt financial accounting and certain forms of encryption. Those opposed to the proposal question the need for a change, and also point out the costs of adjusting to the proposed change and its inconvenience to amateur astronomers and others who rely upon astronomical calculations published in advance. Reports have been circulated that the cost of checking and correcting software to accommodate the new definition of UTC would be many millions of dollars for some systems. In October 2005 American Astronomical Society asked the ITU for a year's time to study the issue. This commission has

  6. Commissioning plans for SSC linac

    Hurd, J.W.; Aprile, R.L.; Chang, C.R.; Crist, C.E.; Cutler, R.I.; Funk, L.W.; Guy, F.W.; Leifeste, G.T.; Raparia, D.; Saadatmand, K.; Sethi, R.C.; Swenson, D.A.; Tooker, J.; Yao, C.G.

    1992-01-01

    Presented are the general description of the SSC linac and the plans for commissioning. Sections of the linac are installed, tested, and beam commissioned in a serial approach. A specialized set of diagnostics is used to characterize the beam through each section. In addition to the standard diagnostic set, plans call for the use of a bunch shape monitor and x-ray spectrometer. Streak camera and digital imaging diagnostics will be developed. The commissioning plan is folded into the general linac project schedule to show the relation between delivery, staging, installation, conditioning, and actual commissioning with beam. These plans form the basis for coordination between the various organizations responsible for different elements of the linac including the technical components, infrastructure, and temporary staging and operation facilities. (Author) 2 figs., 17 refs

  7. Conclusions of the Ad-hoc Review Committee (ARC) on the International Commission on Stratigraphy (ICS) of the International Union of Geological Sciences (IUGS) (Paris, 7-8 November 2005)

    2007-01-01

    @@ Background Following the recommendations of the IUGS Strategic Planning Committee (2000) and IUGS Strategic Action Plan (2001)to appoint Ad-hoc Review Committees (ARCs) to hold reviewsof all IUGS-funded scientific activities on a regular basis, theIUGS Executive Committee decided at its last meeting in Vilnius, Lithuania (March 2005) that an ARC should be convened toreview the IUGS International Commission on. Stratigraphy(ICS). ICS has been part of IUGS since 1965, and the last reviewof ICS by the IUGS was in 1995.

  8. New body starts independent advisory work for EU Commission

    Anon.

    1994-01-01

    The new European Science and Technology Assembly (ESTA) had its first General Assembly on 6-7 September in Brussels. According to Commissioner A. Ruberti, the European Union's 'Minister' for science, technology and higher education, who has been largely responsible for ESTA's creation, the tasks of the new and independent Assembly of Scientists are to give opinions and advice and to help the European Commission implement the EU research policy

  9. National Capital Planning Commission Meeting Transcripts

    National Capital Planning Commission — Transcripts of the monthly (with the exception of August) National Capital Planning Commission meeting transcripts are provided for research to confirm actions taken...

  10. 75 FR 11166 - Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission...

    2010-03-10

    ... the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission; Notice of Joint Meeting of the Nuclear Regulatory Commission and the Federal Energy Regulatory Commission March 2, 2010. The Federal Energy Regulatory Commission (FERC) and the Nuclear Regulatory Commission (NRC) will hold...

  11. Commission Conditions d'emploi

    Staff Association

    2017-01-01

    Au CERN, nous avons la formidable possibilité d’imaginer nos CONDITIONS D’EMPLOIS. Rendez-vous compte ! Nous avons le pouvoir de proposer des idées et de les défendre pour avoir des conditions d’emplois qui soient les plus attractives possibles pour le personnel en place et à venir. ---------------- L’Association du personnel du CERN, tout le monde connait ou en a entendu parler. Ce qui est moins connu, ce sont les diverses commissions internes qui traitent des sujets propres à défendre les intérêts du personnel. Les publications dans notre journal, l’Echo, sont un des moyens à notre disposition pour vous faire découvrir chacune des commissions internes de l’Association du personnel (voir Echo n°242 sur la commission juridique, et Echo n°255 sur la commission des cas particuliers). Commission Conditions d&...

  12. National Bioethics Commissions as Educators.

    Lee, Lisa M

    2017-05-01

    As has become tradition, executive directors of United States' presidential bioethics committees offer reflections about their experience shortly after the orderly shutdown of the commission staff. After the records are filed according to government records regulations; after all the staff members, who are hired into temporary positions that must be renewed every two years, have secured permanent employment; after preparations are made to ensure that the next commission staff (should there be one) has a budget and standard operating procedures in order to begin its work in a timely manner; after the lights are turned out for the last time, the executive director makes the final climb up the stairs into the sunlight and reflects on the whirlwind. There is much about my work with the Presidential Commission for the Study of Bioethical Issues that deserves comment, but one aspect of the commission that has been especially valuable to me is its work to educate the nation on bioethical issues. This is, moreover, a contribution in which the commission staff was central, and it is one that, as an ethics educator myself, I will cherish deeply. © 2017 The Hastings Center.

  13. Fifty years contribution to research and technological development of Argentina. Part 4

    Aguirre, Fernando; Boselli, Alfredo; Colangelo, Luis J.; Coll, Jorge A.; Espejo, Hector; Mattei, Clara E.; Ornstein, Roberto M.; Palacios, Tulio A.; Radicella, Renato; Rodrigo, Felix

    2003-01-01

    The paper is the forth part of a short history of the National Atomic Energy Commission (CNEA). The activities concerning the radioactive waste management are reviewed as well as the research and development programs in the sciences related to nuclear energy. (author)

  14. Katerynoslav is the scientific archived commission and collections of writing sights

    K. O. Telezhnyak

    2014-02-01

    The scientific value of Katerynoslav of the scientific archived commission is marked in the article, that was instrumental in forming of a deserving spring base for science with a variety of issues and indicated that collecting as a practice was a creature of his time and contributed to the development of science, education. The scientific archived commissions were semi­official establishments. They executed the functions of local historical societies simultaneously. Collective activity of members of Commission was very fruitful. It influenced on maintenance of unique complexes of writing sources. It is necessary to mark selfless activity each to the member of Commission. People that enter in the complement of Commission became the business connoisseurs. Local researchers gradually from amateurs became professionals. Them active work was instrumental in awakening of the personal interest at local wide public to historical science and native edge.

  15. Ciência, telégrafos e geografia: os engenheiros militares da Comissão Rondon, 1907-1915 Science, telegraphs, and geography: military engineers in the Rondon Commission, 1907-1915

    Patrícia M. Aranha

    2013-03-01

    Full Text Available Tem como objeto os trabalhos de demarcação de fronteiras e inventário do território noroeste do país entre 1907 e 1915, ocasião em que se destacam as realizações da Comissão Construtora de Linhas Telegráficas Estratégicas do Mato Grosso ao Amazonas, organizada pelos ministérios da Guerra, Viação e Obras Públicas e Agricultura, com vistas à integração nacional. A pesquisa tem por finalidade apresentar as formas pelas quais se desenvolviam os trabalhos de levantamento topográfico, realizados pelos engenheiros militares enviados pelo Ministério da Guerra, e compreender as atividades desses militares em campo. Além disso, há interesse nas demandas do Ministério da Guerra e em como o atendimento a elas se dava no interior da comissão.The article focuses on the work to demarcate borders and chart the Brazilian northwest from 1907 to 1915, a project aimed at national integration and undertaken by the Rondon Commission for the Construction of Telegraph Lines from Mato Grosso to Amazonas, which was organized by the Brazilian ministries of War, Transportation and Public Works, and Agriculture. The study explores the ways in which topographic surveys were conducted by the military engineers sent by the Ministry of War and also endeavors to understand their activities in the field. Of further interest are the demands made by the War Ministry and how they were responded to within the commission.

  16. Commissioning of the ATLAS Experiment

    AUTHOR|(CDS)2069446

    2008-01-01

    The status of the commissioning of the ATLAS experiment as of May 2008 is presented. The subdetector integration in recent milestone weeks is described, especially the cosmic commissioning in milestone week M6, focusing on simultaneous running and combined track analysis of the muon detector and inner detector. The liquid argon and tile calorimeters have achieved near-full operation, and are integrated with the calorimeter trigger. The High-Level-Trigger infrastructure is installed and algorithms tested in technical runs. Problems with the inner detector cooling compressors are being fixed.

  17. Surrogacy commissioning fathers and HIV

    Jordaan, D W

    2014-01-01

    Surrogacy is not regulated by a single legal instrument only, nor is confirmation of a surrogacy agreement by the High Court an unqualified green light for the surrogacy process to proceed. In the context of the HIV status of the commissioning father, whose gametes are to be used for the conception of the child in pursuance of a surrogacy agreement, the intended in vitro fertilisation of the surrogate mother may only take place on condition that the commissioning father, and his semen, have b...

  18. Status of Nuclear Activities of Bangladesh Atomic Energy Commission

    Begum, Zakia [Planning and Development, Bangladesh Atomic Energy Commission - BAEC, Paramanu Bhaban, E 12/A, Agargoan, 01207 Shere Banglanagar, Dhaka (Bangladesh)

    2008-07-01

    Bangladesh Atomic Energy Commission (BAEC) is the national authority for acquisition, development and application of Nuclear Science and Technology and thus is playing the pioneering role for the development of the country's nuclear research programmes and thus helping to achieve the cherished goal of self-reliance through national efforts and international co-operation. Being firmly committed to the peaceful uses of Atomic Energy, programmes have been undertaken in Physical Sciences, Biological Sciences, Engineering and Nuclear Power Sector by Bangladesh Atomic Energy Commission and some of the results have been transferred from laboratories to hospitals, agriculture, industries and environment for practical applications. In spite of some major constrains, presently BAEC's activities have increased many folds and keeping in view of the overall power crisis of the country efforts have also been given to establish Nuclear Power Plant in the country. (author)

  19. 3 CFR 13521 - Executive Order 13521 of November 24, 2009. Establishing the Presidential Commission for the...

    2010-01-01

    ... tests used for risk assessment; and the application of neuro- and robotic sciences. It may also examine... related areas of science and technology. The Commission shall pursue its work with the goal of identifying... impacts of advances in biomedical and behavioral research, healthcare delivery, or other areas of science...

  20. 77 FR 61608 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    2012-10-10

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Public Meeting of the Presidential Commission for the Study of Bioethical Issues AGENCY: Department of Health and Human Services, Office of the Assistant... leaders in medicine, science, ethics, religion, law, and engineering. The Commission advises [[Page 61609...

  1. 78 FR 46335 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    2013-07-31

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Public Meeting of the Presidential Commission for the... the Secretary, Department of Health and Human Services. ACTION: Notice of meeting. SUMMARY: The... Bioethics Commission is an advisory panel of the nation's leaders in medicine, science, ethics, religion...

  2. 75 FR 16127 - Establishment of the Presidential Commission for the Study of Bioethical Issues

    2010-03-31

    ... Ms. Crawford work in the Commission's office located at: 1425 New York Avenue, NW., Suite C100... advances in biomedicine and related areas of science and technology. The Commission shall pursue its work..., medicine, technology, engineering, law, philosophy, theology, and other areas of the humanities or social...

  3. 47 CFR 1.1528 - Commission review.

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Commission review. 1.1528 Section 1.1528... Commission review. Either the applicant or Bureau counsel may seek Commission review of the initial decision on the application, or the Commission may decide to review the decision on its own initiative, in...

  4. Translating landscape: the Colombian Chorographic Commission

    Veronica Uribe Hanabergh

    2014-01-01

    Full Text Available In 1850 the Colombian government developed a project to survey the young country´s landscape. Scientists, writers, and artists were invited to make part of the project led by the Italian military, geographer and cartographer, Agustin Codazzi. After nine years and three different artists, the Commission had many watercolor drawings that portrayed a landscape, not only in its physical traits, but also in its social, economic and agricultural development. Through the lens of these artists, the drawings that concluded the survey showed a landscape that was truly original but that was also seen through the lens of a certain romantic eye inherited by a firm European legacy. As a result, these watercolors show the different regions, people, and means of transportation, crops and trades. The Colombian Chorographic Commission was an important project in the construction of the Colombian modern nation, a country that was constantly divided by federalist and centralist politics, liberal and conservative parties. An interesting union between science, politics and art, these drawings represent the process of the modernization of nineteenth-century Colombia.

  5. LHC Commissioning and First Operation

    Myers, S

    2010-01-01

    A description is given of the repair of the LHC after the accident of September 2008. The LHC hardware and beam commissioning and initial operation are reviewed both in terms of beam and hardware performance. The implemented machine protection measures and their impact on LHC operation are presented.

  6. Commissioning Leibstadt nuclear power plant

    Roeder, A.; Degen, R.; Nedelko, U.

    1985-01-01

    This paper describes the experience and benefits obtained from the use of temporary oil fired boilers of sufficient capacity to allow commissioning and no-load tests to be carried out on the turbine-generator months ahead of steam being available from the NSSS. The successful result at Leibstadt may be a model for other plants

  7. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    D. Acosta

    The commissioning effort is presently addressing two main areas: the commissioning of the hardware components at the pit and the coordination of the activities of the newly constituted Detector Performance groups (DPGs). At point 5, a plan regarding the service cavern and the commissioning of the connections of the off-detector electronics (for the data collection line and trigger primitive generation) to the central DAQ and the central Trigger has been defined. This activity was started early February and will continue until May. It began with Tracker electronics followed so far by HCAL and CSC. The goal is to have by May every detector commission, as much as possible, their data transfer paths from FED to Central DAQ as well as their trigger setups between TPGs and Global Level 1 trigger. The next focus is on connections of front-ends to the service cavern. This depends strongly on the installations of services. Presently the only detector which has its link fibers connected to the off-detector electr...

  8. Life sciences at CEA

    2000-01-01

    This paper presents briefly the organization of the - Direction des Sciences du Vivant - of french atomic energy commission (Commissariat a l'Energie Atomique (CEA)) and their main axes of research (F.M)

  9. LHC: Construction and Commissioning Status

    Evans, Lyndon R

    2007-01-01

    The installation of the Large Hadron Collider at CERN is now approaching completion. All magnets are installed with the exception of a few inner triplet quadrupoles. The first of the eight machine sectors is cold and power tests are proceeding. Two other sectors are ready for cool down and interconnect work is proceeding at a satisfactory pace in the other five sectors. In view of a number of accumulated delays, the original plan for partial commissioning of the machine and a low energy pilot run at the end of 2007 will now have to be abandoned. Instead, the full commissioning of the machine to top energy in a single step will start once the injector chain becomes available in spring 2008.

  10. Guidance on future art commissioning.

    2009-05-01

    Delegates at Building Better Healthcare's recent "National Patient Environment and the Arts Conference 2009" in London heard how national public arts think tank ixia has appointed Bristol-based arts and wellbeing development agency Willis Newson to write "concise and convincing guidance" on commissioning art for new healthcare facilities. A key message, during a joint presentation, was that integrating artwork into hospitals and other healthcare premises requires the earliest possible consideration to reap the maximum rewards.

  11. Making the Choices Necessary to Make a Difference: The Responsibility of National Bioethics Commissions.

    Grady, Christine

    2017-05-01

    In this essay, I offer some reflections on how the topics were identified and approached by the Presidential Commission for the Study of Bioethical Issues, on which I had the honor to serve, in the hope that the reflections may be useful to future national bioethics commissions. In the executive order that established the bioethics commission, President Obama explicitly recognized the ethical imperative to responsibly pursue science, innovation, and advances in biomedical research and health care, and the importance of national attention to these issues. The bioethics commission prioritized practicable, actionable, targeted recommendations. Like most earlier U.S. national bioethics commissions, President Obama's commission did not undertake projects on significant and troublesome issues related to health and health care that were not associated with new science or technology. Issues such as health care access, health care delivery, opioid addiction, end-of-life care, and physician-aid-in-dying are topical and ethically complex areas of significance to bioethics, and they are also being discussed and debated by the public, the media, and policy-makers. In my view, there are good reasons to select and prioritize projects as well as a justification for confining commission efforts to issues related to novel science and emerging technologies, when there is only one national-level bioethics commission that has been established by the Office of the President. © 2017 The Hastings Center.

  12. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    T. Camporesi

    The major progress made during the last months has been in the consolidation of services for the +endcaps and three barrel wheels (YB+2, YB+1 and YB0): all subdetectors have now final power connections (including Detector Safety protection), the gas systems have been commissioned for all gas detectors (the recirculation is not yet activated for the RPC though) and detector cooling has also been commissioned. Their integration with final services is the necessary condition for being able to operate larger fractions the detector. Recent weeks have seen full HCAL, more than 50% of EB and full wheels of DTs and CSC being operated using final services. This has not yet translated into major progress of global integration due to major interruptions of central services, which have not allowed the necessary debugging and commissioning time to all the subdetec¬tors and central activities like DAQ and trigger. Moreover the running in of the final central services has introduced instabilities related to the co...

  13. Report of the disarmament commission

    1991-07-01

    At its forty-fifth session, the General Assembly adopted resolution 45/62 B of 4 December 1990, entitled ''Report of the Disarmament Commission'', by which the Assembly, inter alia: notes that no consensus could be reached on specific recommendations for the item regarding various aspects of the arms race, particularly the nuclear-arms race and nuclear disarmament, as well as a general approach to negotiations on nuclear and conventional disarmament; Working Group II on agenda item 5 of the United Nations Disarmament Commission, entitled ''Process of nuclear disarmament in the framework of international peace and security, with the objective of the elimination of nuclear weapons'', held 11 meetings during the 1991 substantive session of the Disarmament Commission which were preceded by a number of rounds of informal consultations conducted by the Chairman. A structure of work which would serve as a guideline for the work of the Group, while at the same time maintaining the general nature of the desired approach was agreed to by the Group; it included the following four items: 1. The relationship between the process of nuclear disarmament and international peace and security; 2. Review of the steps taken in the process of nuclear disarmament; 3. Strengthening the process of nuclear disarmament, necessary conditions, and mechanisms required for it; 4. The role of the United Nations system in the process of nuclear disarmament with the objective of the elimination of nuclear weapons

  14. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    T. Camporesi

    P5 Commissioning activities The commissioning effort at the pit has made major progress since the last CMS week concerning the installation and operation of the off-detector electronics in USC. The progress has been much slower in the experi¬mental cavern due to the delay in the deployment of the infrastructure which should eventually allow safe powering-up of the front ends. Nevertheless, temporary power connections have allowed operation of slices of subdetectors at any given time. HF, HE, ECAL, DTs, RPCs and CSCs have carried out local commissioning tests with these temporary services. The status of hardware deployment in USC and on the towers/balconies is represented in the detailed table below.   Table 1: Status of installation of off-detector electronics. FEDs are detector dependent hardware modules which perform the first ‘colla¬tion’ of front-end data and send it to Central-data for event building. Tracker, ECAL, HCAL have their front end electronics mo...

  15. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    D. Acosta

    The global commissioning campaign begins this year with a series of weekly two-day global runs of limited participation until mid-March. The aim of these runs varies week-to-week, but includes the commissioning the calorimeter triggers, the muon track-finder triggers in the DT/CSC overlap, the PLL locking ranges, and generally accumulating data either for HCAL noise characterization or detector studies with cosmic muons. In mid-March a full Global Run is scheduled with all components participating, followed in April by a Cosmic Run with the aim of collecting statistics over a couple weeks with the installed Tracker and other subsystems. The ultimate milestone is the Cosmic Run At Four Tesla (CRAFT), with a completed CMS closed and the solenoid energized for data-taking during June. The Detector Performance Groups start the year with the focus to prepare for LHC collisions, and the associated challenges (CSA08) and global commissioning exercises (CRAFT) along the way. New this year is the addition of the Tri...

  16. Federal Trade Commission's authority to regulate marketing to children: deceptive vs. unfair rulemaking.

    Pomeranz, Jennifer L

    2011-01-01

    Food and beverage marketing directed at children is of increasing concern to the public health and legal communities. The new administration at the Federal Trade Commission and abundant science on the topic make it a particularly opportune time for the government to reconsider regulating marketing directed at youth. This Article analyzes the Commission's authority to regulate food and beverage marketing directed at children under its jurisdiction over unfair and deceptive acts and practices to determine which avenue is most viable. The author finds that the Federal Trade Commission has the authority to regulate deceptive marketing practices directed at vulnerable populations. Although the Commission can issue individual orders, its remedial power to initiate rules would better address the pervasiveness of modern marketing practices. The Commission does not currently have the power to regulate unfair marketing to children; however, even if Congress reinstated this authority, the Commission's authority over deceptive marketing may be preferable to regulate these practices. Deceptive communications are not protected by the First Amendment and the deceptive standard matches the science associated with marketing to children. The Federal Trade Commission has the authority to initiate rulemaking in the realm of food and beverage marketing to children as deceptive communications in interstate commerce, in violation of the Federal Trade Commission Act. However, to effectuate this process, Congress would need to grant the Commission the authority to do so under the Administrative Procedures Act.

  17. Unit Commissioning of “Belene” NPP (Bulgaria)

    2009-01-01

    This presentations gives detailed information about the following topics about commissioning: principles of NPP commissioning; phases of NPP commissioning; organization of commissioning activities; duties and responsibilities of the parties for carrying out unit commissioning activities; responsibility and obligations of the sides during commissioning of power unit; documentation required for power unit commissioning; quality assurance for commissioning activities

  18. Alaska Public Offices Commission, Department of Administration, State of

    Visiting Alaska State Employees State of Alaska Department of Administration Alaska Public Offices Commission Alaska Department of Administration, Alaska Public Offices Commission APOC Home Commission Filer ; AO's Contact Us Administration > Alaska Public Offices Commission Alaska Public Offices Commission

  19. Production of radionuclides and radiopharmaceuticals at the Argentine Atomic Energy National Commission

    Mitta, A.E.A.; Bonetto, Oscar; Kurcbart, Horacio; Mancini, Alberto; Marquez, R.O.; Palcos, M.C.; Quihillalt, E.L.; Salas, G.N.B. de; Suner, A.A.; Troparevsky, M.L.P. de.

    1978-03-01

    The production of radionuclides and radiopharmaceuticals at the CNEA is described, as well as the preparation of reagent's sets, and informations is given on the preparation of Tc-99m and In-113m generators. Some figures of the production of 1974-1976 are given. (author) [es

  20. National Capital Planning Commission Library contents

    National Capital Planning Commission — The National Capital Planning Commission library catalog is a compilation of titles, authors, years of publication and topics of books, reports and NCPC publications.

  1. Powers and Duties of Corporate Affairs Commission

    Mofasony

    POWERS AND DUTIES OF THE CORPORATE AFFAIRS. COMMISSION ... The Registrar-General is the Chief Executive of the Commission and is saddled .... Federal Board of Inland Revenue Department of the Ministry of Finance v). Register ...

  2. Atomic Energy Commission Act, 2000 (Act 588)

    2000-01-01

    Act 588 of the Republic of Ghana entitled, Atomic Energy Commission Act, 2000, amends and consolidates the Atomic Energy Commission Act, 204 of 1963 relating to the establishment of the Atomic Energy Commission. Act 588 makes provision for the Ghana Atomic Energy Commission to establish more institutes for the purpose of research in furtherance of its functions and also promote the commercialization of its research and development results. (E.A.A.)

  3. Bioethics commission to review gene patenting

    Rothenburg, L.

    1995-12-01

    In October, in an unexpected development, U.S. President Bill Clinton created a national ethics advisory board, the National Bioethics Advisory Commission (NBAC, Washington, DC), to study both research ethics and the management and use of genetic information. Of particular interest to biotechnology companies and researchers is the fact that the commission`s brief encompasses issues about human gene patenting, a subject not contained in earlier proposals for the commission.

  4. The Industry Commission inquiry into charitable organisations.

    Suter, K

    1996-01-01

    The Industry Commission has carried out Australia's largest inquiry into charities. It was, from the point of view of charities, an unsatisfactory operation, all the more so since it was not clear why the task had been given to the commission. This article examines the commission's work in three ways: the overall relationship between government and charities; the commission's proposed major reforms; and the minor reforms.

  5. Atomic Energy Commission (Amendment) Law, 1993

    1993-02-01

    The Atomic Energy Commission (Amendment) Law, 1993 (P.N.D.C.L. 308) seeks to amend the Atomic Energy Commission Act of 1963 (Act 204) so as to provide for the establishment of a Radiation Protection Board and other institutes under the Ghana Atomic Energy Commission. The Law further repeats the Atomic Energy Commission (Amendment) Law of 1982 (P.N.D.C.L. 37). (EAA)

  6. Nuclear Regulatory Commission 1989 Information Digest

    1989-03-01

    The Nuclear Regulatory Commission 1989 Information Digest provides summary information regarding the US Nuclear Regulatory Commission, its regulatory responsibilities, and areas licensed by the Commission. This is the first of an annual publication for the general use of the NRC staff and is available to the public. The Digest is divided into two parts: the first presents an overview of the US Nuclear Regulatory Commission and the second provides data on NRC commercial nuclear reactor licensees and commercial nuclear power reactors worldwide

  7. Commissioning Instrument for the GTC

    Cuevas, S.; Sánchez, B.; Bringas, V.; Espejo, C.; Flores, R.; Chapa, O.; Lara, G.; Chavolla, A.; Anguiano, G.; Arciniega, S.; Dorantes, A.; González, J. L.; Montoya, J. M.; Toral, R.; Hernández, H.; Nava, R.; Devaney, N.; Castro, J.; Cavaller-Marqués, L.

    2005-12-01

    During the GTC integration phase, the Commissioning Instrument (CI) will be a diagnostic tool for performance verification. The CI features four operation modes: imaging, pupil imaging, Curvature WFS, and high resolution Shack-Hartmann WFS. This instrument was built by the Instituto de Astronomía UNAM and the Centro de Ingeniería y Desarrollo Industrial (CIDESI) under GRANTECAN contract after a public bid. In this paper we made a general instrument overview and we show some of the performance final results obtained when the Factory Acceptance tests previous to its transport to La Palma.

  8. 17 CFR 201.57 - Commission review.

    2010-04-01

    ... 17 Commodity and Securities Exchanges 2 2010-04-01 2010-04-01 false Commission review. 201.57... Regulations Pertaining to the Equal Access to Justice Act § 201.57 Commission review. In accordance with the... Division of the Commission may seek review of the initial decision on the fee application, or the...

  9. Commissioning of the CEBAF cryomodules

    Drury, M.; Lee, T.; Marshall, J.; Preble, J.; Saulter, Q.; Schneider, W.; Spata, M.; Wiseman, M.

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, over half of the cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz. A cryomodule must provide an energy gain of 20 MeV to the 200 μA beam. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's of the cavity ports, the unloaded Q (Q 0 ) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity. The sensitivity of the resonant frequency to changes in pressure and gradient is also measured. Finally, the mechanical tuners are cycled and characterized. In all cases, the performance of CEBAF cryomodules has exceeded the design requirements. A portable test stand allows local control of the rf system and provides automated data acquisition. This paper describes the cryomodule commissioning hardware, software, and measurements

  10. Annual report and balance 2003; Memoria y balance 2003

    NONE

    2004-07-01

    This annual report presents the CNEA's (National Atomic Energy Commission) activities during the year 2003. The first part is devoted to the general objectives and accomplishments of the Organization. The second part describes the programs and projects in different fields such as reactors and nuclear power plants, fuel cycle, radioactive waste management, radioisotopes and radiation, research and development in basic sciences and engineering, decommissioning of nuclear installations, etc. The evolution of the human resources and the training activities are outlined in the third part of the report. The CNEA's nuclear centers are described in part 4 and the technical assistance services and production activities in part 5. Nuclear safety and safeguards are covered in the 6th section. Parts 7 and 8 present the information on inter institutional affairs and on the CNEA related enterprises respectively. The last part is the financial accounting.

  11. Annual report and balance 2003

    2004-01-01

    This annual report presents the CNEA's (National Atomic Energy Commission) activities during the year 2003. The first part is devoted to the general objectives and accomplishments of the Organization. The second part describes the programs and projects in different fields such as reactors and nuclear power plants, fuel cycle, radioactive waste management, radioisotopes and radiation, research and development in basic sciences and engineering, decommissioning of nuclear installations, etc. The evolution of the human resources and the training activities are outlined in the third part of the report. The CNEA's nuclear centers are described in part 4 and the technical assistance services and production activities in part 5. Nuclear safety and safeguards are covered in the 6th section. Parts 7 and 8 present the information on inter institutional affairs and on the CNEA related enterprises respectively. The last part is the financial accounting

  12. The role of national ethics commissions in Finland.

    Halila, Ritva

    2003-08-01

    There are six national ethics commissions in Finland. The National Advisory Board on Research Ethics was first established in 1991, followed by the National Advisory Board on Biotechnology and the Board on Gene Technology in 1995. The National Advisory Board on Health Care Ethics was established in 1998, followed by its Sub-Committee on Medical Research Ethics in 1999. The Co-operation Group for Laboratory Animal Sciences was established in 2001. Only the Board on Gene Technology works as a national authority and gives binding opinions and recommendations about the use of genetically modified organisms. The Sub-Committee on Medical Research Ethics acts a national research ethics committee and gives opinions about research projects. Other advisory boards do not make legally binding decisions, but their expertise gives a lot of power to their opinions and statements. The commissions work in close collaboration with each other, having regular meetings. They arrange seminars and conferences, and share information with each other. The commissions also share duties and information in international collaboration. How the voice and opinions of these commissions is heard in society lies in the wide, multi-professional expertise of their members. Large commissions and wide expertise may make it difficult to find consensus in their opinions and statements, although wide expertise may, more than discussion in a small expert group, help to further process difficult ethical issues. Collaboration between different bodies is important in order to share duties, and also to add more emphasis to the statements and opinions where different bodies share interests. In our country, the interest that national commissions share is research ethics, where the advisory boards and their members have discharged collaborative activities for years.

  13. 77 FR 2298 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    2012-01-17

    ... nation's leaders in medicine, science, ethics, religion, law, and engineering. The Commission advises the President on bioethical issues arising from advances in biomedicine and related areas of science and... research, health care delivery, and technological innovation are conducted in a socially and ethically...

  14. Molr - A delegation framework for accelerator commissioning

    Valliappan, Nachiappan

    2017-01-01

    Accelerator commissioning is the process of preparing an accelerator for beam operations. A typical commissioning period at CERN involves running thousands of tests on many complex systems and machinery to ensure smooth beam operations and correct functioning of the machine protection systems. AccTesting is a software framework which helps orchestrate the commissioning of CERN’s accelerators and it’s equipment systems. This involves running and managing tests provided by various commissioning tools and analyzing their outcomes. Currently, AccTesting only supports a specific set of commissioning tools. In this project, we aim to widen the spectrum of commissioning tools supported by AccTesting by developing a generic and programmable integration framework called Molr, which would enable the integration of more commissioning tools with AccTesting. In this report, we summarize the work done during the summer student project and lay out a brief overview of the current status and next steps for Molr.

  15. SERPUKHOV: UNK transfer beamline commissioned

    Anon.

    1994-01-01

    At the end of the 1000 hour February-March run of the 70 GeV proton synchrotron at the Institute for High Energy Physics (IHEP), Serpukhov, near Moscow, the new 2.7-kilometre UNK Beam Transfer Line (BTL) was commissioned with proton beam. BTL will eventually transfer beam from the existing U70 proton accelerator to the first stage of the UNK (UNK-1, now under construction) where it will be accelerated in the 21- kilometre ring up to 600 GeV. BTL was designed for proton energies between 60 and 70 GeV, momentum spread ± 2 x 10 -3 and beam emittance 2 mm.mrad, with systems for fast ejection, beam transfer and injection into UNK-1

  16. Commissioning and operation of DRAGON

    Engel, Sabine

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the 21 Na(p,γ) 22 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of ±20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented

  17. Commissioning and operation of DRAGON

    Engel, S

    2003-01-01

    The new DRAGON (Detector of Recoils And Gammas Of Nuclear reactions) facility, located at the TRIUMF-ISAC radioactive beams laboratory in Vancouver, Canada, has initiated its experimental program. Recently DRAGON was used for initial studies of the sup 2 sup 1 Na(p,gamma) sup 2 sup 2 Mg reaction. This facility was designed to measure absolutely the rates of radiative proton and alpha capture reactions of astrophysical interest to a precision of +-20%, using inverse kinematics. To fully understand the optics and operational parameters of the facility along with the transmission particularly of the reaction recoils, systematic studies of various configurations are in progress using stable beams along with measurements of well-known resonance reactions. The status of these commissioning studies is presented.

  18. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS

    T. Camporesi

    The central commissioning activities have concentrated mostly in the Service cavern. Since early February the central DAQ has been ready to accept connections from FEDs from the various partitions. This has triggered a campaign from all subdetectors to install their readout crates in USC55. Systematic tests of the connections between FEDs and Central DAQ have been scheduled and to date more than 70% of all FED connections have been successfully tested from almost all subdetectors. In March the Level 1 trigger team started deployment of their hardware followed by a campaign of testing the connections between Trigger primitive generators and the corresponding LV1 hardware (Regional Calorimeter Trigger and Global Muon Trigger). The functionality tests are continuing to date by pattern tests of increasing complexity. In April the central DAQ was ready to start FED system tests, which amounts to testing the data reading and trans¬fer-ability from the FEDs to the Filter Units (with or without an actual ...

  19. Division A Commission 31: Time

    Hosokawa, Mizuhiko; Arias, Elisa Felicitas; Manchester, Richard; Tuckey, Philip; Matsakis, Demetrios; Zhang, Shougang; Zharov, Vladimir

    2016-04-01

    Time is an essential element of fundamental astronomy. In recent years there have been many time-related issues, in scientific and technological aspects as well as in conventions and definitions. At the Commission 31 (Time) business meeting at the XXIX General Assembly, recent progress and many topics, including Pulsar Time Scales WG and Future UTC WG activities, were reviewed and discussed. In this report, we will review the progress of these topics in the past three years. There are many remarkable topics, such as Time scales, Atomic clock development, Time transfer, Future UTC and future redefinition of the second. Among them, scientific highlights are the progress of pulsar time scales and the optical frequency standards. On the other hand, as the social convention, change in the definition of UTC and the second is important.

  20. Israel Atomic Energy Commission 1996 Annual Report

    NONE

    1997-12-31

    Selecting the research efforts to be highlighted in the Israel Atomic Energy Commission`s Annual Report from the large body and broad spectrum of ongoing work is not an easy task. The extensive bibliography of published results attached to the report attests to the scope of this difficulty. Of the many worthwhile projects, four were chosen to represent best the current trends in the continuing R and D program at the research centers of the Israel Atomic Energy Commission. One of these trends is the growing cooperation with private industry, in an attempt to gear our R and D programs to respond to market demands. Another feature, noted already several years ago, is the extensive collaboration of our scientists and engineers with colleagues at other institutions, in Israel and abroad. some of the work reported is part of evolving international industrial cooperation projects, illustrating both these trends. Following a trend common to many nuclear research centers around the world, a substantial part of our research effort is non-nuclear in nature. This is illustrated in the first article, which deals with advances in the application of non-linear optics in diverse fields of science and technology. These include state-of-the-art solid-state lasers, rapid modulation of light signals, development and generation of tunable sources of coherent light, optical data storage and the microscopic probing of biological and inorganic samples. The present work reports on a range of R and D, from the fundamentals of non-linear optical materials to proof-of-principle demonstrations of non-linear subwavelength resolution microscopy, to fabrication of prototype commercial tunable laser systems The second report considers the microstrain characteristics in some alloys using X-ray diffraction (XRD). The research utilizes XRD line broadening effects to study the characteristics of alloys from especially prepared surfaces. These characteristics include the homogeneity of alloying

  1. Annual report and balance 2007; Memoria y balance 2007

    NONE

    2008-07-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2007 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes.

  2. Fifty years contribution to research and technological development of Argentina. Part 6

    Aguirre, Fernando; Boselli, Alfredo; Colangelo, Luis J.; Coll, Jorge A.; Espejo, Hector; Mattei, Clara E.; Ornstein, Roberto M.; Palacios, Tulio A.; Radicella, Renato; Rodrigo, Felix

    2004-01-01

    The paper is the sixth part of a short history of the National Atomic Energy Commission (CNEA). The international relations and the nuclear technology exports of the CNEA are reviewed. A short description of the Argentine nuclear centers and nuclear enterprises is also given. The present structure of the CNEA is briefly outlined. (author)

  3. Annual report and balance 2002

    2003-01-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2002 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes

  4. Annual report and balance 2001

    2002-01-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2001 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes

  5. Annual report and balance 2007

    2008-01-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2007 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes

  6. Annual report and balance 2006; Memoria y balance 2006

    NONE

    2007-07-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2006 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes.

  7. Annual report and balance 2006

    2007-01-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2006 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes

  8. Annual report and balance 2005; Memoria y balance 2005

    NONE

    2006-07-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2005 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes.

  9. Annual report and balance 2001; Memoria y balance 2001

    NONE

    2002-07-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2001 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes.

  10. Annual report and balance 2002; Memoria y balance 2002

    NONE

    2003-07-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2002 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes.

  11. Annual report and balance 2004

    2005-01-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2004 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes

  12. Annual report and balance 2005

    2006-01-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2005 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes

  13. Annual report and balance 2004; Memoria y balance 2004

    NONE

    2005-07-01

    A summary of the research, development, services and production activities of the National Atomic Energy Commission (CNEA) of Argentina is given as well as details of management resources together with the evolution of the budget. The activities of the CNEA related companies during 2004 are also outlined. A special mention is made of the activities of the three CNEA educational and training institutes.

  14. Co-operation Agreement relating to LHC Commissioning

    2005-01-01

    CERN Director-General Robert Aymar and Ryszard Tadeusiewicz, the Rector of the AGH University of Science and Technology in Cracow, after signing the agreement. On 29 July, the Rector of the AGH University of Science and Technology in Cracow, Ryszard Tadeusiewicz, and CERN Director-General Robert Aymar signed a collaboration agreement relating to the commissioning of the instrumentation and monitoring equipment for the LHC cryogenic system. Under the agreement, a team consisting of a dozen physicists, engineers and technicians from the AGH University in Cracow will lend a helping hand to the teams at CERN for the commissioning of the cryogenic system in the tunnel. This is the first in what will be a series of agreements relating to the commissioning of the LHC's various systems. From the end of this year until the summer of 2007, CERN will require reinforcements of physicists, engineers and technicians in order to complete the many tasks associated with the start-up of the accelerator. CERN is therefore pre...

  15. The May 26, 1999 Resolution of the Joint Meeting of the Board of the Radiation Diagnosis and Radiation Therapy Section, Academic Council, Ministry of Health of Russia, the X-ray Diagnosis Ad Hoc Commission, Interdepartmental Scientific Council for Medical Radiology and Radiation Medicine, Russian Academy of Medical Sciences, and the Executive Committee, Russian Association of Radiologists

    Kharchenko, V.P.; Rozhkova, N.I.; Vlasov, P.V.

    2000-01-01

    The text of the May 26, 1999 Resolution of the joint meeting of the Board of the Radiation Diagnosis and Radiation Therapy Section of the Ministry of Health of Russia with the X-ray Diagnostics Ad Hoc Problem Commission of the Intergovernmental Scientific Council for Medical Radiology and Radiation Medicine of the Russian Academy of Medical Sciences and the Executive Committee of Russian Association of Radiologists is presented. It is noted that in spite of the fact that the intervention radiology as an independent branch has not yet been formed, separate developments, aimed at application of invasive interventions under the control of radiodiagnostic methods are carried out in the area of bronco pulmonology, gastroenterology, mammology, gynecology, urology, oncology above 30 years and steps in legalization of this trend are also undertaken. Absence of statistical documentation on technical and staff provision of therapeutical-prophylactic establishments as well as unified terminology is noted. The tasks aimed at broader introduction of intervention radiology in Russia are set up [ru

  16. Science for Development: Failure in Ghana

    kofimereku

    Next to follow was the Ghana Atomic Energy Commission, established at .... notion of science education and the predictions made by the model of science ..... banks, production and consumption armies, serve as a god for those who have.

  17. The Commissioning of the LHC Technical Systems

    Saban, R; Baggiolini, V; Ballarino, A; Barbero-Soto, E; Bellesia, B; Bordry, Frederick; Bozzini, D; Casas-Lino, M-P; Chareyre, V; Claudet, S; Coelingh, G-J; Dahlerup-Petersen, K; Denz, R; Fehér, S; Flora, R; Gruwé, M; Kain, V; Kirby, G; Koratzinos, M; Lauckner, R; Le Naour, S; Mess, K-H; Millet, F; Montabonnet, V; Nisbet, D; Perea-Solano, B; Pojer, M; Principe, R; Rabehl, R; Rijllart, A; Redaelli, S; Rodríguez-Mateos, F; Schmidt, R; Serio, L; Siemko, A; Solfaroli-Camillocci, M; Thiesen, H; Venturini, W; Vergara-Fernandez, A; Verweij, A; Zerlauth, M

    2007-01-01

    The LHC is an accelerator with unprecedented complexity where the energy stored in magnets and the beams exceeds other accelerators by one-to-two orders of magnitude. To ensure a safe and efficient machine start-up without being plagued by technical problems, a phase of "hardware commissioning" was introduced: a thorough commissioning of technical systems without beam. This activity started in June 2005 with the commissioning of individual systems, followed by operating a full sector, one eighth of the machine; the commissioning is expected to last until spring 2008 when commissioning with beam will start. The LHC architecture allows the commissioning of each of the eight sectors independently from the others, before the installation of other sectors is complete. An important effort went into the definition of the programme and the organization of the coordination in the field, as well as in the preparation of the tools to record and analyze test results. This paper discusses the experience with this approach...

  18. Nuclear Regulatory Commission issuances, October 1993

    1993-10-01

    This document contains a Commission issuance in which the Commission denies the petitioners' motion to quash or modify a subpoena issued by the NRC staff in the course of an investigation to determine if the petitioners' have violated NRC regulations and to determine if safety-related problems exist at NRC-licensed facilities. The pertinent regulations and the Commission's Memorandum and Order are included

  19. Large Hadron Collider commissioning and first operation.

    Myers, S

    2012-02-28

    A history of the commissioning and the very successful early operation of the Large Hadron Collider (LHC) is described. The accident that interrupted the first commissioning, its repair and the enhanced protection system put in place are fully described. The LHC beam commissioning and operational performance are reviewed for the period from 2010 to mid-2011. Preliminary plans for operation and future upgrades for the LHC are given for the short and medium term.

  20. A Staged Approach to LHC Commissioning

    Lamont, M; Brüning, Oliver Sim; Collier, P; Lauckner, R; Schmidt, R

    2006-01-01

    Effective commissioning of the LHC with beam will demand very good preparation; all concerned subsystems will need to be well-prepared and thoroughly tested before first beam. To clarify the demands on the systems involved the objectives of the commissioning phases are presented, along with a breakdown of the phases and the essential prerequisites for each. The nature of the interdependencies between the various systems is highlighted; in particular the need for a well-planned commissioning of the machine protection system.

  1. Commission release recommendations for attracting more women, minorities

    Showstack, Randy

    U.S. Air Force Colonel Eileen Collins, the first woman to command a U.S. Space Shuttle mission, tries to encourage and inspire young women and minorities to follow their dreams of becoming scientists, engineers, and technicians.“I like to tell young women that there have been 12 men who have walked on the Moon, but not yet one woman, and you could be the first,” Collins, who is a member of the Commission on the Advancement of Women and Minorities in Science, Engineering, and Technology Development (CAWMSET), said at a July 13 hearing of the U.S. House of Representatives Subcommittee on Technology reviewing the commission's recommendations. Collins said she tells young women, “No one has walked on Mars, and you could be that person.”

  2. Licensing of the OPAL reactor during construction and commissioning

    Summerfield, M.

    2007-01-01

    This paper presents a description of the licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) OPAL reactor. It addresses the Construction Licence, the interface between ANSTO, INVAP (the contractor with responsibility for design and construction of the facility) and the Australian Radiation Protection and Nuclear Safety Agency (ARPANSA, the Australian nuclear regulator) during the construction of OPAL, specific licensing issues that have arisen during the construction and commissioning process, and the Operating Licence Application. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators

  3. Startup and commissioning of pressurized water reactors

    Albert, L.J.; Gilbert, C.F.

    1983-05-01

    A critical phase of plant development is the test, startup, and commissioning period. The effort expended prior to commissioning has a definite effect on the reliability and continuing availability of the plant during its life. This paper describes a test, startup, and commissioning program for a pressurized water reactor (PWR) plant. This program commences with the completion of construction and continues through the turnover of equipment/systems to the owner's startup/ commissioning group. The paper addresses the organization of the test/startup group, planning and scheduling, test procedures and initial testing, staffing and certification of the test group, training of operators, and turnover to the owner

  4. Federal Energy Regulatory Commission (FERC) Regions

    Department of Homeland Security — Federal Energy Regulatory Commission (FERC) Regions. FERC is an independent agency that regulates the interstate transmission of electricity, natural gas, and oil....

  5. Commissioning of the nuclear power plant

    Furtado, P.M.; Rolf, F.

    1984-01-01

    Nuclear Power Plant Angra 2, located at Itaorna Beach-Angra dos Reis is the first plant of the Brazilian-German Agreement to be commissioned. The Nuclear Power Plant is a pressurized water reactor rated at 3765 Mw thermal/1325 Mw electrical. For commissioning purpose the plant is divided into 110 systems. Plant commissioning objective is to demonstrate the safe and correct operation of each plan component, system and of the whole plant in agreement with design conditions, licensing requirements and contractual obligations. This work gives a description of plant commissioning objectives, activities their time sequence, and documentation. (Author) [pt

  6. Israel Atomic Energy Commission 1997 Annual Report

    1997-01-01

    The 1997 Annual Report is published in a special year for Israel, marking the 50th anniversary of its independece and statehood. From its inception, and the election of a distinguished scientist as its first president, Israel has regarded science and technology as a central pillar for future AEC development and a lever for improved quality of life of its people. The Israel Atomic Energy Commission, which will be celebrating its own anniversary in a few years, has made a modest but significant contribution to the establishment and growth of the technological infrastructure of the country. The first article in this Annual Report focuses attention on yet another aspect of our continuing investigation of the basic properties of technologically interesting and important materials, presented in our 1994 and 1996 Annual Reports. The current entry describes an application of the nuclear Time Differential Perturbed Angular Correlation technique to the study of the structure and properties of metal-hydrogen compounds, of potential interest within the framework of future, environmentally attractive hydrogen-burning energy systems, and in fusion power reactors. The second article also relates to some basic aspects of nuclear fusion. A theoretical study of the behavior and properties of laser-generated hot plasmas resulted in the proposal of a new confinement scheme, in which a plasma generated by circularly polarized laser light is confined in a miniature magnetic bottle created by magnetic fields induced in the plasma by the same light. The paper discusses the conditions under which such confinement and ensuing energy gain may be achieved. Measurements of actual axial magnetic fields generated in plasma by intense circularly polarized laser light are also reported. The third report describes one of our ongoing efforts to improve and streamline the techniques and procedures used in medical applications of radioisotopes. Replacement of the customary )311 solutions for

  7. Israel Atomic Energy Commission 1997 Annual Report

    NONE

    1998-12-31

    The 1997 Annual Report is published in a special year for Israel, marking the 50th anniversary of its independece and statehood. From its inception, and the election of a distinguished scientist as its first president, Israel has regarded science and technology as a central pillar for future AEC development and a lever for improved quality of life of its people. The Israel Atomic Energy Commission, which will be celebrating its own anniversary in a few years, has made a modest but significant contribution to the establishment and growth of the technological infrastructure of the country. The first article in this Annual Report focuses attention on yet another aspect of our continuing investigation of the basic properties of technologically interesting and important materials, presented in our 1994 and 1996 Annual Reports. The current entry describes an application of the nuclear Time Differential Perturbed Angular Correlation technique to the study of the structure and properties of metal-hydrogen compounds, of potential interest within the framework of future, environmentally attractive hydrogen-burning energy systems, and in fusion power reactors. The second article also relates to some basic aspects of nuclear fusion. A theoretical study of the behavior and properties of laser-generated hot plasmas resulted in the proposal of a new confinement scheme, in which a plasma generated by circularly polarized laser light is confined in a miniature magnetic bottle created by magnetic fields induced in the plasma by the same light. The paper discusses the conditions under which such confinement and ensuing energy gain may be achieved. Measurements of actual axial magnetic fields generated in plasma by intense circularly polarized laser light are also reported. The third report describes one of our ongoing efforts to improve and streamline the techniques and procedures used in medical applications of radioisotopes. Replacement of the customary 311 solutions for

  8. A Study on the Efficient Operating Management of Atomic Energy Commission

    Yun, Sungwon; Chung, W. S.; Lee, D. S.; Park, S. J.

    2013-04-01

    This study aimed to provide professionals in humanities and social sciences, not only nuclear, with a place for communication by establishing a website of Atomic Energy Commission and people with a place for participation which help the nuclear policy reflect public opinions. By establishing the website of Atomic Energy Commission, experts (including those in humanities and social sciences) can suggest policy agenda and public opinions can be suggested through the place for public participation. Also the website should restrict on indiscreet search by separating sections only for experts and provide experts with a section for active and creative debate on nuclear policy. All the accessible meeting agenda and minutes have been chronologically organized and the findings of the committee have been announced to share with people concerning nuclear policy. In terms of the effective operation of Atomic Energy Commission, research has been conducted for standing committee, regular meeting, activating the commission through system change and expert committee in addition to support for the 2nd meeting of Atomic Energy Committee and the 31st Nuclear Expert Committee. Activation measures to improve the operating system of the commission is proposed as following; changing of the commission's chairman operating system, standing commission regular meeting, activation of subcommittee and expanding and diversifying of agenda

  9. Real Estate Agent Commission Disputes

    Anida Duarte

    2015-06-01

    Full Text Available The purpose of this study was to examine the relationship among Procuring Cause Law, real estate agent years of experience, and real estate commission disputes. A pilot survey was conducted in the southwestern United States among real estate agents, realtor(s, and brokers. After testing the hypothesis, the decision was made to fail to reject the hypothesis and conclude that real estate agent experience and not Procuring Cause Law produced favorable outcomes in disputes. As a result, the following recommendations were made: (a Agency seller and buyer’s agreements should be used in each transaction to avoid disputes, (b proper expectations and guidelines should be reviewed prior to starting any real estate transaction, (c a checklist may assist in the assurance that all valuable information is reviewed, (d agents could benefit from fully understanding Procuring Cause Law and sharing this information with their clients, (e state and national regulatory requirements of the law could be modified for easier understanding and use, and (f consumers who willfully violate the law could be subject to monetary penalties.

  10. The International Law Commission at the Mid-point of its Quinquennium (Survey of its Work in 2014)

    Šturma, Pavel

    -, č. 5 (2014), s. 453-462 ISSN 1805-0565. E-ISSN 1805-0999 Institutional support: RVO:68378122 Keywords : International Law Commission * public international law * programme of the meeting Subject RIV: AG - Legal Sciences

  11. Journal of Earth System Science | Indian Academy of Sciences

    , Burkina Faso, Africa. African Policy Center, United Nations Economic Commission for Africa (UNECA), Addis-Ababa, Ethiopia. Department of Civil Engineering, National Pingtung University of Science and Technology, Pingtung, Taiwan, ...

  12. Israel Atomic Energy Commission 1996 Annual Report

    1996-01-01

    Selecting the research efforts to be highlighted in the Israel Atomic Energy Commission's Annual Report from the large body and broad spectrum of ongoing work is not an easy task. The extensive bibliography of published results attached to the report attests to the scope of this difficulty. Of the many worthwhile projects, four were chosen to represent best the current trends in the continuing R and D program at the research centers of the Israel Atomic Energy Commission. One of these trends is the growing cooperation with private industry, in an attempt to gear our R and D programs to respond to market demands. Another feature, noted already several years ago, is the extensive collaboration of our scientists and engineers with colleagues at other institutions, in Israel and abroad. some of the work reported is part of evolving international industrial cooperation projects, illustrating both these trends. Following a trend common to many nuclear research centers around the world, a substantial part of our research effort is non-nuclear in nature. This is illustrated in the first article, which deals with advances in the application of non-linear optics in diverse fields of science and technology. These include state-of-the-art solid-state lasers, rapid modulation of light signals, development and generation of tunable sources of coherent light, optical data storage and the microscopic probing of biological and inorganic samples. The present work reports on a range of R and D, from the fundamentals of non-linear optical materials to proof-of-principle demonstrations of non-linear subwavelength resolution microscopy, to fabrication of prototype commercial tunable laser systems The second report considers the microstrain characteristics in some alloys using X-ray diffraction (XRD). The research utilizes XRD line broadening effects to study the characteristics of alloys from especially prepared surfaces. These characteristics include the homogeneity of alloying

  13. SOFIA science instruments: commissioning, upgrades and future opportunities

    Smith, Erin C.; Miles, John W.; Helton, L. Andrew; Sankrit, Ravi; Andersson, B. G.; Becklin, Eric E.; De Buizer, James M.; Dowell, C. D.; Dunham, Edward W.; Güsten, Rolf; Harper, Doyal A.; Herter, Terry L.; Keller, Luke D.; Klein, Randolf; Krabbe, Alfred; Logsdon, Sarah; Marcum, Pamela M.; McLean, Ian S.; Reach, William T.; Richter, Matthew J.; Roellig, Thomas L.; Sandell, Göran; Savage, Maureen L.; Temi, Pasquale; Vacca, William D.; Vaillancourt, John E.; Van Cleve, Jeffrey E.; Young, Erick T.

    2014-07-01

    The Stratospheric Observatory for Infrared Astronomy (SOFIA) is the world's largest airborne observatory, featuring a 2.5 meter effective aperture telescope housed in the aft section of a Boeing 747SP aircraft. SOFIA's current instrument suite includes: FORCAST (Faint Object InfraRed CAmera for the SOFIA Telescope), a 5-40 μm dual band imager/grism spectrometer developed at Cornell University; HIPO (High-speed Imaging Photometer for Occultations), a 0.3-1.1μm imager built by Lowell Observatory; GREAT (German Receiver for Astronomy at Terahertz Frequencies), a multichannel heterodyne spectrometer from 60-240 μm, developed by a consortium led by the Max Planck Institute for Radio Astronomy; FLITECAM (First Light Infrared Test Experiment CAMera), a 1-5 μm wide-field imager/grism spectrometer developed at UCLA; FIFI-LS (Far-Infrared Field-Imaging Line Spectrometer), a 42-200 μm IFU grating spectrograph completed by University Stuttgart; and EXES (Echelon-Cross-Echelle Spectrograph), a 5-28 μm highresolution spectrometer designed at the University of Texas and being completed by UC Davis and NASA Ames Research Center. HAWC+ (High-resolution Airborne Wideband Camera) is a 50-240 μm imager that was originally developed at the University of Chicago as a first-generation instrument (HAWC), and is being upgraded at JPL to add polarimetry and new detectors developed at Goddard Space Flight Center (GSFC). SOFIA will continually update its instrument suite with new instrumentation, technology demonstration experiments and upgrades to the existing instrument suite. This paper details the current instrument capabilities and status, as well as the plans for future instrumentation.

  14. 77 FR 67637 - Equity and Excellence Commission

    2012-11-13

    ... notice also describes the functions of the Commission. Notice of this meeting is required by section 10(a.... ADDRESSES: The Commission will meet in Washington, DC at the National Museum of the American Indian at... Lounge of the museum on November 27 and in the museum's fourth-floor conference room on November 28. FOR...

  15. Commissioning quality assurance at Pickering NGS

    Wieckowski, J.T.

    1983-05-01

    Ontario Hydro decided in 1978 to implement a formal quality assurance program applicable to commissioning and operation of nuclear generating stations. Pickering NGS is the first station to have the commissioning quality assurance (CQA) program applied to it. This paper outlines the scope, implementation, and evaluation of the CQA program as applied to Pickering Unit 5

  16. 76 FR 4369 - Special Law Enforcement Commissions

    2011-01-25

    ...This notice announces the online publication of the Interim Special Law Enforcement Commission Policy, Rules and Procedures, the Interim Special Law Enforcement Commission Protocols and the Interim Domestic Violence Waiver that will be used by the Office of Justice Services following passage of the Tribal Law and Order Act of 2010. The documents are published on the Indian Affairs Web site.

  17. Ghana Atomic Energy Commission: Annual Report 2001

    NONE

    2002-07-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute.

  18. The Lancet Commission on Syria | IDRC - International ...

    The journal has adopted a series of global commissions that convene groups of experts for a limited time to produce thematic work aimed at improving human lives through scientific review and inquiry, and to encourage accountability for the problem under study. The Commission on Syria marks the first time a Southern ...

  19. Ghana Atomic Energy Commission: Annual Report 2001

    2002-01-01

    This report covers the activities and research progams of the Ghana Atomic Energy Commission for the year 2001. The research programs and associated publications have been grouped under the three main institutes of the Commission namely National Nuclear Research Institute, Radiation Protection Institute and Biotechnology and Nuclear Agricultre Research Institute

  20. Niger Delta Development Commission and Sustainable ...

    Niger Delta Development Commission and Sustainable Development of Niger Delta Region of Nigeria: The Case of Rivers State. Goddey Wilson. Abstract. The study is on Niger Delta Development Commission and sustainable development of Niger Delta region of Nigeria, the case of Rivers State. The main objective of the ...

  1. Commissioning MMS: Challenges and Lessons Learned

    Wood, Paul; Gramling, Cheryl; Reiter, Jennifer; Smith, Patrick; Stone, John

    2016-01-01

    This paper discusses commissioning of NASA's Magnetospheric MultiScale (MMS) Mission. The mission includes four identical spacecraft with a large, complex set of instrumentation. The planning for and execution of commissioning for this mission is described. The paper concludes by discussing lessons learned.

  2. A Practical Guide for Commissioning Existing Buildings

    Haasl, T.

    1999-05-11

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  3. A Practical Guide for Commissioning Existing Buildings

    Haasl, T.; Sharp, T.

    1999-04-01

    Although this guide focuses on the retrocommissioning process and its advantages, all three types of commissioning--retrocommissioning, commissioning, and recommissioning--play an equally important role in ensuring that buildings perform efficiently and provide comfortable, safe, and productive work environments for owners and occupants. For new construction and retrofit projects, commissioning should be incorporated early, during design, and last throughout the length of the project. For buildings that were never commissioned, the retrocommissioning process can yield a wealth of cost-saving opportunities while enhancing a building's environment. Finally, once a building is commissioned or retrocommissioned, incorporating recommissioning into the organization's O and M program (by periodically reapplying the original diagnostic testing and checklist procedures) helps ensure that cost savings and other benefits gained from the original process persist over time.

  4. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    Tiziano Camporesi

    Pit commissioning activities The last 4 months have seen various major achievements in hardware commissioning, global data taking, readiness of the DPGs to deal with LHC data flows and alignment and calibration workflows. Since February, the global commissioning has been characterized on the one side by more and more of the final CMS detector becoming available for global readout and triggering and on the other side by consolidation of many of the central software infrastructure and of most of the services infrastructure. The reliability of services like cooling, power, gas has markedly improved with respect to what we observed in the second half of 2007.   Of particular note are the delivery of all low voltage power supplies, the commissioning of the final power distribution, the progressive commissioning ( still ongoing)  of the Detector Safety System and of the associated DCS early warning and alarm system. On the detector side, while already we are used to seeing all of HCAL being exe...

  5. How Do R&D Programs Funded by the Dg Xii (Science, Research and Development Directorate of the European Commission Impact the Upstream Oil and Gas Industry in Europe? Comment les programmes de R&D financés par la DG XII de la Commission européenne influencent-ils l'industrie pétrolière amont en Europe ?

    Forbes P.

    2006-12-01

    Full Text Available This paper provides an overview of the direct and indirect impact which DG XII funding for research and development has on the oil and gas exploration and production industry in Europe. Despite the relatively low level of funding, the impact is quite significant. These impacts are presented using a bottom-up analysis, starting with the impact of technology on industry and society, the impact of research on technology, and the impact of DG XII funding on both research and technology for the exploration and production of oil and gas. The different aspects that are discussed include the direct impact, the impact on R&D organization and management, and the impact due to the Commission demonstration program for oil and gas (Thermie. Examples are provided from current and past project results. The future impact on the industry, and Commission policy toward the oil and gas sector are suggestedIn the near future, it is expected that there will be greater impact on production technologies, on the contribution of oil and gas companies to long-term R&D, and on the transfer of results to the Commission demonstration program. L'article apporte une vue d'ensemble sur la manière dont les financements de la DG XII pour la recherche et le développement (R&D ont une influence, directe ou indirecte, sur l'exploration et la production dans l'industrie du pétrole et du gaz en Europe. Le niveau de ces financements est présenté comme relativement faible de façon à mettre en évidence que, comparativement, leur répercution est très significative. L'impact de ces financements est abordé en couvrant successivement les effets sur la société, l'industrie, la technologie et finalement la recherche elle-même. Nous décrivons ici les influences de la technologie sur l'industrie et sur la société, puis les influences de la recherche sur la technologie et enfin celles des financements de la DG XII sur la recherche et la technologie en exploration-production. Diff

  6. Licensing of ANSTO'S OPAL reactor during construction and commissioning

    Summerfield, M.W.; Ordonez, J.P.

    2006-01-01

    Full text: This paper presents a general description of the ongoing licensing activities associated with the construction and commissioning of the Australian Nuclear Science and Technology Organisation's (ANSTO) Open Pool Australian Light-water (OPAL) Reactor at their Lucas Heights site. It addresses the following aspects: The Construction Licence - what it is and what impact it had on the construction of the OPAL Reactor, specifically the various Construction Licence Conditions; The interface between ANSTO, INVAP and ARPANSA during the construction of the OPAL Reactor, particularly in relation to ARPANS Regulation 54; Specific licensing issues that have arisen during the construction and commissioning process and how they have been resolved; The Operating Licence Application - what it is and how it interfaces with the construction and commissioning of the OPAL Reactor. These aspects are all addressed from the point of view of the licensee ANSTO and the RRR Project. Particular emphasis will be given to the way in which the licensing process is integrated into the overall project program and the lessons learnt that may be of benefit to other licensees and regulators. Note that this paper is an update of a presentation given at IGORR10 and follows on from a paper previously presented at PNBC12 in October 2002

  7. Instrumented home energy rating and commissioning

    Wray, Craig P.; Walker, Iain S.; Sherman, Max H.

    2003-05-01

    Currently, houses do not perform optimally or even as many codes and forecasts predict, largely because they are field assembled and there is no consistent process to identify deficiencies or to correct them. Solving this problem requires field performance evaluations using appropriate and agreed upon procedures in the form of a new process called residential commissioning. The purpose of this project is to develop and document these procedures and to demonstrate the value that applying them could provide in both new and existing California houses. This project has four specific objectives: to develop metrics and diagnostics for assessing house performance, to provide information on the potential benefits of commissioning using a whole-house approach, to develop programmatic guidelines for commissioning, and to conduct outreach efforts to transfer project results to industry stakeholders. The primary outcomes from this project are the development of residential commissioning guidelines and the analytical confirmation that there are significant potential benefits associated with commissioning California houses, particularly existing ones. In addition, we have made substantial advances in understanding the accuracy and usability of diagnostics for commissioning houses. In some cases, we have been able to work with equipment manufacturers to improve these aspects of their diagnostic tools. These outcomes provide a solid foundation on which to build a residential commissioning program in California. We expect that a concerted effort will be necessary to integrate such a program with existing building industry efforts and to demonstrate its use in the field.

  8. The Kemeny commission report. Comments by UKAEA

    1979-01-01

    The report of the President's Commission - the Kemeny Report - on the accident at Three Mile island has been considered by the UKAEA and the implications of the Commission's findings and recommendations for the United Kingdom examined. The contents of the report have been studied not only generally but also for each site and especially with respect to plant instrumentation, operator training, emergency arrangements and communications. The Authority believes that there are no major deficiencies but is fully aware of the crucial importance of continuing to exercise all possible care and ensuring that each detailed point arising from the Kemeny Commission's Report is given careful thought. (U.K.)

  9. Commissioning quality assurance for nuclear power plants

    NONE

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig.

  10. Commissioning quality assurance for nuclear power plants

    1986-09-01

    This standard contains the requirements for the quality assurance program applicable to the commissioning phase of a nuclear power plant. This standard embodies the relevant quality assurance requirements of CSA Standard CAN3-N286.0, and is the governing Standard for commissioning quality assurance activities in the event of any conflicting requirements. This Standard applies to the commissioning of safety-related equipment, systems, and structures as identified by the owner. It may be applied to other equipment, systems, and structures at the discretion of the owner. 1 fig

  11. Official communication of the Safety Commission

    DG Unit

    2009-01-01

    The Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of 2 April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  12. Official communication of the Safety Commission

    DG Unit

    2009-01-01

    We, the Prevention and Training section of the Safety Commission, would like to inform you that the new Safety Awareness course for newcomers will replace the welcome video in building 55 as of the 2nd April. The 3 levels (‘Safety at CERN’, ‘General Risks’ and ‘Specific Risks’) followed by 3 tests will determine access to CERN. Thanks to the SIR (Safety Information Registration, http://sir.cern.ch) application, it will be possible for you to follow the awareness course from your computer. For more information, go to the Safety Commission web site: http://safety-commission.web.cern.ch

  13. Nuclear Regulatory Commission: more aggressive leadership needed

    Staats, E.B.

    1980-01-01

    The Energy Reorganization Act of 1974 which established the Nuclear Regulatory Commission required GAO to evaluate the Commission's performance by January 18, 1980. This report responds to that requirement. GAO concluded that, although improvements have been made, the Commission's nuclear regulatory performance can be characterized best as slow, indecisive, cautious - in a word, complacent. This has largely resulted from a lack of aggressive leadership as evidenced by the Commissioners' failure to establish regulatory goals, control policymaking, and most importantly, clearly define their roles in nuclear regulation

  14. Permanent Commission for Health and Safety

    Association du personnel

    2007-01-01

    The mandate of the Staff Association's permanent commission for Health and Safety is to examine all aspects of health and safety related to the working environment at CERN. In no way does it wish to be a substitute for the official bodies that are responsible for these matters. The Commission's aim is to formulate remarks on and make proposals about these questions to the relevant bodies and the CERN Management. Its main focus is the safety of the CERN staff but it is also concerned with the safety of the installations and of the CERN environment. The Commission reports to the Staff Council and the Executive Committee of the Staff Association.

  15. Nuclear Regulatory Commission issuances, January 1992

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Defense (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, May 1992

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Impact of National Universities Commission (NUC) Accreditation ...

    Nekky Umera

    (NUC) accreditation exercise on university administrative structure of four selected Nigerian ... The Commission's recommendations led to the setting up by Government the National ... For instance, the goals of tertiary education as spelt out in ...

  18. Commissioning (Phases 4, 4A, 4B)

    Schofield, Andrew

    1997-01-01

    Phase 4 marked the completion of ANS&A's commitments under the BAA, as the new large centrifuge at the Waterways Experiment Station was commissioned and a series of research experiments were undertaken to demonstrate the breadth of new...

  19. Compressor Load Stand: Commissioning and Control Strategies

    Causey, Andrew

    1998-01-01

    .... The purpose of this research project was to commission this load stand, which includes setting up the hardware, setting up a control system, a data acquisition system, and an automatic test sequence system...

  20. The commissioning of nuclear power plants

    1989-09-01

    The objectives and requirements to be met in commissioning nuclear power plants are presented. The objective of commissioning is to ensure that each component, subsystem, system, or structure in a plant will be capable of fulfilling its design requirements throughout its design life. The requirements for commissioning are: the preparation of a detailed, comprehensive, documented program to demonstrate that all components, systems and structures relevant to safety meet design intent; documented evidence that safety systems are fully operable and can meet design requirements; and, appropriate documentation of the actual state or behaviour of all components, systems and structures relevant to safety. All systems must be included in the commissioning program. Whenever possible, full safety system test should be performed. If a full system in situ test is not possible, alternative means are suggested. (8 refs.)

  1. Nuclear Regulatory Commission issuances, July 1992

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances, June 1992

    1992-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Nuclear Regulatory Commission issuances, April 1994

    1994-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. Nuclear Regulatory Commission Issuances, November 1980

    1980-11-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  5. Nuclear Regulatory Commission issuances, December 1991

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances, December 1993

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regulatory Commission issuances, December 1992

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. Nuclear Regulatory Commission issuances, September 1992

    1992-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  9. Nuclear Regulatory Commission issuances, February 1992

    1992-01-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Director's Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  10. Nuclear Regulatory Commission issuances, March 1993

    1993-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Nuclear Regulatory Commission issuances, July 1993

    1993-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission issuances, August 1992

    1992-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. arXiv Medical Physics Commissioning

    Meer, David

    The medical commissioning is an important step to bring a particle gantry into clinical operation for tumour treatments. This involves the parametrization and characterization of all relevant systems including the beam delivery, the patient table, the imaging systems and the connection to all required software components. This article is limited to necessary tasks for the beam delivery system of a pencil beam scanning system. Usually the commissioning starts with the characterization of the unscanned beam and the calibration of the beam energy. The following steps are the parametrization of the scanning system, the commissioning of the beam position monitoring system and characterization of the spot size, all requiring precisions better than 1 mm. The commissioning effort for these tasks depends also on the gantry topology. Finally, the calibration of the dose measurement system ensures that any dose distribution can be delivered with an absolute precision better than 1%.

  14. Nuclear Regulatory Commission issuances, May 1982

    1982-01-01

    This report includes the issuances received during the specified period from the Commission, the Atomic Safety and Licensing Appeal Boards, the Atomic Safety and Licensing Boards, the Administrative Law Judge, the Directors' Decision, and the Denials of Petitions for Rulemaking

  15. Commissioning the Linac Coherent Light Source injector

    R. Akre

    2008-03-01

    Full Text Available The Linac Coherent Light Source is a SASE x-ray free-electron laser (FEL project presently under construction at SLAC [J. Arthur et al., SLAC-R-593, 2002.]. The injector section, from drive laser and rf photocathode gun through first bunch compressor chicane, was installed in the fall of 2006. The initial system commissioning with an electron beam was completed in August of 2007, with the goal of a 1.2-micron emittance in a 1-nC bunch demonstrated. The second phase of commissioning, including second bunch compressor and full linac, is planned for 2008, with FEL commissioning in 2009. We report experimental results and experience gained in the first phase of commissioning, including the photocathode drive laser, rf gun, photocathode, S-band and X-band rf systems, first bunch compressor, and the various beam diagnostics.

  16. Nuclear Regulatory Commission Issuances, December 1980

    1980-12-01

    Contents: Issuances of the Nuclear Regulatory Commission; Issuances of the Atomic Safety and Licensing Appeal Boards; Issuances of the Atomic Safety and Licensing Boards; and Issuances of the Directors Denial

  17. Nuclear Regulatory Commission issuances, August 1991

    1991-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Alaska State Commission for Human Rights

    Harassment Poster Filing a Complaint with the Commission Public Hearing Cases Accusations Decisions Public . vs. Anchorage Plumbing and Heating Vilma Anderson vs. Anchorage School District Robin Block vs. Pulse

  19. LHC injection optics measurements at commissioning (2015)

    Garcia-Tabares Valdivieso, Ana; Coello De Portugal - Martinez Vazquez, Jaime Maria; Garcia-Bonilla, Alba-Carolina; Langner, Andy Sven; Maclean, Ewen Hamish; Malina, Lukas; Mcateer, Meghan Jill; Persson, Tobias Hakan Bjorn; Skowronski, Piotr Krzysztof; Tomas Garcia, Rogelio; CERN. Geneva. ATS Department

    2016-01-01

    This report describes the measurement and correction process followed during the 2015 LHC injection optics commissioning which extended into Machine Developments (MDs). Results have been analyzed and compared to the 2012 measurements.

  20. Nuclear Regulatory Commission issuances, February 1993

    1993-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, November 1992

    1992-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances, April 1993

    1993-04-01

    This report includes the issuances received during the specified period from the commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. International radiation commissions 1896 to 2008. Research into atmospheric radiation from IMO to IAMAS

    Bolle, H.J.; Moeller, F.; London, J.

    2008-01-01

    The document covers a historical compilation on research into atmospheric radiation from 1896 to 2008. The first part is a brief history of the radiation commissions of IMO (International Meteorological Organization) and IUGG (International Union of Geodesy and Geophysics) for the period 1824 to 1948. Part 2 Covers the International Radiation Commission (IRC) of IAM (International Association of Meteorology)/IAMAS (International Association of Meteorology and Atmospheric Sciences)/IAMAP (International Association of Meteorology and Atmospheric Physics); the Re-constitution of the IUGG Radiation Commision, the Officers of the International Radiation Commission of IUUG 1948-2008, and the activities of the Radiation Commision of the IUGG 1948-2008. The appendices include the Radiation Commission Members, the summaries of presented papers from 1954 and 1957, the IRC publications, and acronyms

  4. International radiation commissions 1896 to 2008. Research into atmospheric radiation from IMO to IAMAS

    Bolle, H J [comp.; Moeller, F; London, J

    2008-05-15

    The document covers a historical compilation on research into atmospheric radiation from 1896 to 2008. The first part is a brief history of the radiation commissions of IMO (International Meteorological Organization) and IUGG (International Union of Geodesy and Geophysics) for the period 1824 to 1948. Part 2 Covers the International Radiation Commission (IRC) of IAM (International Association of Meteorology)/IAMAS (International Association of Meteorology and Atmospheric Sciences)/IAMAP (International Association of Meteorology and Atmospheric Physics); the Re-constitution of the IUGG Radiation Commision, the Officers of the International Radiation Commission of IUUG 1948-2008, and the activities of the Radiation Commision of the IUGG 1948-2008. The appendices include the Radiation Commission Members, the summaries of presented papers from 1954 and 1957, the IRC publications, and acronyms.

  5. Online Learning of Commission Avoidant Portfolio Ensembles

    Uziel, Guy; El-Yaniv, Ran

    2016-01-01

    We present a novel online ensemble learning strategy for portfolio selection. The new strategy controls and exploits any set of commission-oblivious portfolio selection algorithms. The strategy handles transaction costs using a novel commission avoidance mechanism. We prove a logarithmic regret bound for our strategy with respect to optimal mixtures of the base algorithms. Numerical examples validate the viability of our method and show significant improvement over the state-of-the-art.

  6. The LHC from commissioning to operation

    Lamont, M

    2011-01-01

    In 2011 the LHC moved from commissioning into the physics production phase with the aim of accumulating 1 fb-1 by the end of the year. The progress from commissioning to operation is described. Emphasis is put on the beam performance, but also on the performance of the different hardware systems. The role of collimation and machine protection is discussed, in view of the very high stored beam and magnet energy.

  7. Alberta Petroleum Marketing Commission annual report, 1993

    1994-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1993 marked the last full year of the Commission operating as Alberta's representative in the energy regulatory arena in Canada and the USA; due to restructuring, these functions will be transferred to the Ministry of Energy in early 1994. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 40.2 million bbl, down 11% from 1992, and receipts of heavy crude were 3.7 million bbl, down 42% from 1992. Revenue from crude oil sales was $800 million, down 25% from 1992. The Commission's natural gas activities in 1993 included price determination and information collection. 4 figs., 3 tabs

  8. Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant

    NONE

    1995-04-07

    The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriate audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.

  9. Eleventh Semiannual Report of the Commission to the Congress, January 1952

    Dean, Gordon

    1952-01-31

    The document represents the eleventh semiannual Atomic Energy Commission (AEC) report to Congress. The report sums up the major activities and developments in the national atomic energy program covering the period July - December 1951. Part II covers financial aspects and Part III, Applications in Plant Science.

  10. On the IFToMM Permanent Commission for History of MMS

    Ceccarelli, Marco; Koetsier, Teun

    2004-01-01

    In this paper we have outlined the historical development of the IFToMM Permanent Commission for History of MMS (Mechanism and Machine Science) by also looking at the recently established field of History of MMS with technical perspectives. The activity of the PC for History of MMS has been

  11. 78 FR 71615 - Public Meeting of the Presidential Commission for the Study of Bioethical Issues

    2013-11-29

    ... DEPARTMENT OF HEALTH AND HUMAN SERVICES Public Meeting of the Presidential Commission for the... the Assistant Secretary for Health, Office of the Secretary, Department of Health and Human Services... bioethics, science, medicine, technology, engineering, law, philosophy, theology, or other areas of the...

  12. 75 FR 81244 - Military Leadership Diversity Commission Meeting

    2010-12-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission Meeting... will take place: 1. Name of Committee: Military Leadership Diversity Commission (MLDC). 2. Date... Military Leadership Diversity Commission to continue their efforts to address congressional concerns as...

  13. 75 FR 2114 - Military Leadership Diversity Commission (MLDC); Meeting

    2010-01-14

    ... DEPARTMENT OF DEFENSE Office of the Secretary Military Leadership Diversity Commission (MLDC....150, the Department of Defense announces that the Military Leadership Diversity Commission (MLDC) will... commissioners of the Military Leadership Diversity Commission to continue their efforts to address congressional...

  14. Commissioning of the LHC Cryogenic System Subsystems Cold Commissioning in Preparation of Full Sector Tests

    Serio, L; Ferlin, G; Gilbert, N; Gruehagen, Henning; Knoops, S; Parente, C; Sanmartí, M

    2006-01-01

    The cryogenic system for the Large Hadron Collider accelerator is presently in its final phase of installation and commissioning at nominal operating temperatures. The refrigeration capacity for the LHC will be produced using eight large cryogenic plants installed on five technical sites and distributed around the 26.7-km circumference ring located in a deep underground tunnel. The status of the cryogenic system commissioning is presented together with the experience gained in operating and commissioning it.

  15. Science policy up close

    Marburger, John H

    2015-01-01

    In a career that included tenures as president of Stony Brook University, director of Brookhaven National Laboratory, and science advisor to President George W. Bush, John Marburger (1941 2011) found himself on the front line of battles that pulled science ever deeper into the political arena. From nuclear power to global warming and stem cell research, science controversies, he discovered, are never just about science. Science Policy Up Close" presents Marburger s reflections on the challenges science administrators face in the twenty-first century. In each phase of public service Marburger came into contact with a new dimension of science policy. The Shoreham Commission exposed him to the problem of handling a volatile public controversy over nuclear power. The Superconducting Super Collider episode gave him insights into the collision between government requirements and scientists expectations and feelings of entitlement. The Directorship of Brookhaven taught him how to talk to the public about the risks ...

  16. Alberta Petroleum Marketing Commission annual report, 1992

    1993-05-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. 1992 marked the end of chronically depressed natural gas prices and a significant reduction in natural gas surpluses. A brief overview is presented of crude oil markets in Canada and the USA. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, unchanged from 1991, and receipts of heavy crude were 6.3 million bbl, up 4% from 1991. Revenue from crude oil sales was $1.1 billion, down from $1.64 billion in 1991. The Commission's natural gas activities in 1992 included price determination and information collection. 9 figs., 1 tab

  17. Alberta Petroleum Marketing Commission annual report, 1991

    1992-04-01

    The Alberta Petroleum Marketing Commission has the responsibility of selling the Crown's royalty share of Alberta's crude and synthetic oil production; similar services are provided for natural gas. The Commission also markets crude oil on behalf of producers to North American and offshore consumers. The Commission's position as the largest crude oil marketeer in Canada enables it to provide analyses of industry pricing and marketing trends to the Alberta government. In 1991, the middle east crisis caused prices to spike at the commencement of the Gulf war, but these quickly stabilized. The Commission's receipts of light and medium royalty oil totalled 45.3 million bbl, down 1.5% from 1990, and receipts of heavy crude were 6.1 million bbl, up 5% from 1990. Revenue from crude oil sales was $1,642,244,000, down from $2,078,197,000 in 1990. Loss of the Montreal market through pipeline closure led to increased pressure on prices, particularly on heavy crudes. The Commission's natural gas activities in 1991 included price determination and information collection. 9 figs., 1 tab

  18. The NRU blowdown test facility commissioning program

    Walsworth, J A; Zanatta, R J; Yamazaki, A R; Semeniuk, D D; Wong, W; Dickson, L W; Ferris, C E; Burton, D H [Atomic Energy of Canada Ltd., Chalk River, ON (Canada). Chalk River Nuclear Labs.

    1990-12-31

    A major experimental program has been established at the Chalk River Nuclear Laboratories (CRL) that will provide essential data on the thermal and mechanical behaviour of nuclear fuel under abnormal reactor operating conditions and on the transient release, transport and deposition of fission product activity from severely degraded fuel. A number of severe fuel damage (SFD) experiments will be conducted within the Blowdown Test Facility (BTF) at CRL. A series of experiments are being conducted to commission this new facility prior to the SFD program. This paper describes the features and the commissioning program for the BTF. A development and testing program is described for critical components used on the reactor test section. In-reactor commissioning with a fuel assembly simulator commenced in 1989 June and preliminary results are given. The paper also outlines plans for future all-effects, in-reactor tests of CANDU-designed fuel. (author). 11 refs., 3 tabs., 7 figs.

  19. VINCI: the VLT Interferometer commissioning instrument

    Kervella, Pierre; Coudé du Foresto, Vincent; Glindemann, Andreas; Hofmann, Reiner

    2000-07-01

    The Very Large Telescope Interferometer (VLTI) is a complex system, made of a large number of separated elements. To prepare an early successful operation, it will require a period of extensive testing and verification to ensure that the many devices involved work properly together, and can produce meaningful data. This paper describes the concept chosen for the VLTI commissioning instrument, LEONARDO da VINCI, and details its functionalities. It is a fiber based two-way beam combiner, associated with an artificial star and an alignment verification unit. The technical commissioning of the VLTI is foreseen as a stepwise process: fringes will first be obtained with the commissioning instrument in an autonomous mode (no other parts of the VLTI involved); then the VLTI telescopes and optical trains will be tested in autocollimation; finally fringes will be observed on the sky.

  20. Commissioning of the Ground Test Accelerator RFQ

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Connolly, R.; Garnett, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohson, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Saadatmand, K.; Sandoval, D.P.; Stevens, R.R.; Vaughn, G.; Wadlinger, E.A.; Weiss, R.; Yuan, V.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on-line. The commissioning stages are the 35 key H - injector, the 2.5 MeV Radio Frequency Quadrupole (RFQ), the Intertank Matching Section (IMS), the 3.2 MeV first 2βγ Drift Tube Linac (DTL-1) module, the 8.7 MeV 2βγ DTL (modules 1--5), and the 24 MeV GTA; all 10 DTL modules. Commissioning results from the RFQ beam experiments will be presented along with comparisons to simulations

  1. Commissioning of the ground test accelerator RFQ

    Johnson, K.F.; Sander, O.R.; Atkins, W.H.; Bolme, G.O.; Brown, S.; Garnott, R.; Gilpatrick, J.D.; Guy, F.W.; Ingalls, W.B.; Little, C.; Lohsen, R.A.; Lloyd, S.; Neuschaefer, G.; Power, J.; Sandoval, D.P.; Saadatmand, K.; Stevens, R.R.Jr.; Vaughn, G.; Wadlinger, E.A.; Yuan, V.; Connolly, R.; Weiss, R.

    1992-01-01

    The Ground Test Accelerator (GTA) has the objective of verifying much of the technology (physics and engineering) required for producing high-brightness, high-current H - beams. GTA commissioning is staged to verify the beam dynamics design of each major accelerator component as it is brought on line. The commissioning stages are the 35-keV H - injector, the 2.5-MeV radio-frequency quadrupole (RFQ), the intertank matching section (IMS), the 3.2-MeV first 2-βλ drift tube linac (DTL-1) module, the 8.7-MeV 2-βλDTL (modules 1-5), and the 24-MeV GTA (all 10 DTL modules). Commissioning results from the RFQ beam experiments are presented along with comparisons with simulations. (Author) 8 refs., 9 figs

  2. Yale and the Atomic Bomb Casualty Commission

    Bowers, J.Z.

    1983-01-01

    This is a description, based largely on personal discussions, of the contributions of men from the Yale University School of Medicine to the saga of the immediate and long-term studies on the medical effects of the atomic bombs at Hiroshima and Nagasaki. They played key roles in the immediate studies of bomb effects, in the creation of long-term studies of delayed effects, and in elevating the Atomic Bomb Casualty Commission after 1955 to a position of excellence in its studies and relations with the Japanese. The accumulation of the information presented in this paper derives from research for the preparation of the history of the Atomic Bomb Casualty Commission. In 1975, the commission was passed to Japanese leadership as the Radiation Effects Research Foundation

  3. Law of the Energy Regulatory Commission

    1995-01-01

    This Decree-Law consist of three chapters each on divided in articles and subsections and came into force in November 1 st., 1995. Chapter I, with the heading 'Nature and Powers', defines the Energy Regulatory Commission as a decentralized organ of the Energy Secretariat with technical and operative autonomy in terms of the law, and establish the conditions for the sell, generation, exportation and importation of electricity with destination to particular and public services. The sell transport, storage and distribution of natural gas, as well as the gas liquefied from petroleum are also considered. Chapter II with the heading 'Organization and duties' establish that the Commission is integrated by five Committee, the President included. The Committee members will deliberate in collegiate manner and the decisions are by majority, having the President a vote of quality. Chapter III for 'General provisions' is related to the lawsuits arises between the Commission and the users of services. (Author)

  4. Federal Energy Regulatory Commission`s fiscal year 1996 financial statement audit

    NONE

    1997-02-14

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1996. The auditors have expressed an unqualified opinion on the 1996 statement of financial position and the related statements of operations and changes in net position.

  5. European commission research activities on iodine

    Loggia, E. della

    1996-01-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs

  6. European commission research activities on iodine

    Loggia, E della [European Commission, Brussels (Belgium)

    1996-12-01

    The research on iodine, as on other important fission products which would be released during a severe accident, carried out directly or organized by the European Commission stems from the Euratom Treaty, namely from Chapter III of the treaty which deals with the protection of the health of the population against radiations and from Chapter I which deals with research. In this paper we do not consider the Commission radiological protection programme: we limit ourselves to the presentation of the research carried out on Iodine as part of the most recent source term studies within the framework Programmes as are called the research programme of the European Commission, usually valid for a 4 year periods. The research activities are carried out by the European Commission either directly through the Joint Research Centres (JRC) or indirectly through collaboration with research organizations of Member States. Concerning the iodine research carried out as Direct Action in the Joint Research Centres, are mentioned here the most relevant activities carried out in this field at the JRC of Ispra and Karlsruhe (TUI). As Indirect Action, we present here the results of some studies allocated by the European Commission to experts of research organizations of Member Countries, followed by a short description of the main results achieved by the Reinforced Concerted Action, within the III Framework Programme (1992-1995). At the end of the paper are described the research on iodine being carried out or proposed within the IV Framework Programme (1995-1998). Mention is also done of the Commission participation, relevant in terms of financial and human efforts, to the PHEBUS FP Project. (author) refs.

  7. Commissioning of the ATLAS Liquid Argon Calorimeters

    Cooke, M; The ATLAS collaboration

    2009-01-01

    Since the first modules of the ATLAS LAr calorimeters were read out in situ in 2006, commissioning studies have been performed. These studies include the testing of the electronics calibration system, surveys for dead or problematic channels, investigations of the quality of the physics pulse shape prediction , and tests of energy and time reconstruction with cosmic or single beam induced signals. The results of these commissioning studies indicate the LAr calorimeters are prepared for LHC collisions and positioned to meet the physics objectives of the ATLAS experiment.

  8. 1992 Nuclear Regulatory Commission Annual Report

    1993-01-01

    This is the 18th annual report of the US Nuclear Regulatory Commission (NRC), covering events and activities occurring in fiscal year 1992 (the year ending September 30, 1992), with some treatment of events from the last quarter of calendar year 1992. The NRC was created by enactment in the Congress of the Energy Reorganization Act of 1974. It is an independent agency of the Federal Government. The five NRC Commissioners are nominated by the President and confirmed by the United States Senate. The Chairman of the Commission is appointed by the President from among the Commissioners confirmed

  9. Jacques Delors - President de la Commission Europeenne

    Dacian Graţian GAL

    2005-02-01

    Full Text Available This article refers to the President of the European Commission between 1985- 1995, Jacques Delors. He was the single person who exercised the presidency of the European Commission during 10 years and this period was one of the most important for the European construction: the achievement of the Single Market, the development of the Single Currency Unit project, of the new common politics, the enlargement of the European Union from 12 members to 15 members etc. Due the contribution of his presidency to the European construction, Jacques Delors is one of the parents of the European construction and one of the most important political men of the XX century.  

  10. Hawk-I - First results from science verification

    Kissler-Patig, M.; Larsen, S.S.|info:eu-repo/dai/nl/304833347; Wehner, E.M.|info:eu-repo/dai/nl/314114688

    2008-01-01

    The VLT wide-field near-infrared imager HAWK-I was commissioned in 2007 and Science Verification (SV) programmes were conducted in August 2007. A selection of results from among the twelve Science Verfication proposals are summarised.

  11. Missing Links: Gender Equity in Science and Technology for ...

    Missing Links: Gender Equity in Science and Technology for Development. Book cover ... Gender Working Group of the United Nations Commission on Science and Technology for Development. Publisher(s): ... Knowledge. Innovation.

  12. 45 CFR 702.12 - Contempt of the Commission.

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Contempt of the Commission. 702.12 Section 702.12 Public Welfare Regulations Relating to Public Welfare (Continued) COMMISSION ON CIVIL RIGHTS RULES ON HEARINGS, REPORTS, AND MEETINGS OF THE COMMISSION Hearings and Reports § 702.12 Contempt of the Commission...

  13. 29 CFR 2200.92 - Review by the Commission.

    2010-07-01

    ... Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH REVIEW COMMISSION RULES OF PROCEDURE Posthearing Procedures § 2200.92 Review by the Commission. (a) Jurisdiction of the Commission; issues on... Commission to review the entire case. The issues to be decided on review are within the discretion of the...

  14. 19 CFR 213.5 - Access to Commission resources.

    2010-04-01

    ... 19 Customs Duties 3 2010-04-01 2010-04-01 false Access to Commission resources. 213.5 Section 213.5 Customs Duties UNITED STATES INTERNATIONAL TRADE COMMISSION INVESTIGATIONS OF UNFAIR PRACTICES IN IMPORT TRADE TRADE REMEDY ASSISTANCE § 213.5 Access to Commission resources. Commission resources, in...

  15. 78 FR 44165 - Nuclear Regulatory Commission Enforcement Policy

    2013-07-23

    ... NUCLEAR REGULATORY COMMISSION [NRC-2013-0159] Nuclear Regulatory Commission Enforcement Policy AGENCY: Nuclear Regulatory Commission. ACTION: Enforcement policy; request for comment. SUMMARY: The U.S... Policy. In SRM-SECY-12-0047, ``Revisions to the Nuclear Regulatory Commission Enforcement Policy,'' dated...

  16. 76 FR 31307 - Commission of Fine Arts; Notice of Meeting

    2011-05-31

    ... COMMISSION OF FINE ARTS Commission of Fine Arts; Notice of Meeting The next meeting of the U.S. Commission of Fine Arts is scheduled for June 16, 2011, at 10 a.m. in the Commission offices at the National Building Museum,Suite 312, Judiciary Square, 401 F Street, NW., Washington, DC, 20001-2728. Items of...

  17. 18 CFR 388.104 - Informal advice from Commission staff.

    2010-04-01

    ... Commission staff. 388.104 Section 388.104 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY... Commission staff. (a) The Commission staff provides informal advice and assistance to the general public and... expressed by the staff do not represent the official views of the Commission, but are designed to aid the...

  18. 17 CFR 171.28 - Participation by Commission staff.

    2010-04-01

    ... staff. 171.28 Section 171.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION..., Membership Denial and Registration Actions § 171.28 Participation by Commission staff. The Division of.... The Commission shall by order establish a supplementary briefing schedule for the Commission staff and...

  19. Nuclear Regulatory Commission issuances, April 1989

    1989-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. Nuclear Regulatory Commission issuances, July 1989

    1989-07-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  1. Nuclear Regulatory Commission issuances, March 1989

    1989-03-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Danish Atomic Energy Commission 1974/75

    1975-11-01

    Activities of the Danish Atomic Energy Commission and the Risoe eesearch Establishment for the period April1, 1974 to March 31, 1975 are summarized. The operations of the various facilities at the Research Establishment are revised. Operating staff levels and financial data are tabulated, a selected list of staff publications is given, and the design data on research facilities are presented. (B.P.)

  3. Nuclear Regulatory Commission issuances, August 1990

    1990-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  4. The European Commission as Network Broker

    Borrás, Susana

    2007-01-01

    after the year 2000. Developing a conceptual framework about brokerage roles in EU policy, the article uses a combination of quantitative and qualitative data in an empirical analysis of two very different cases where the Commission has been embattled the past years. The article argues that previous...

  5. Nuclear Regulatory Commission issuances, December 1989

    1989-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Ten years after the Jali Commission

    Ten years have lapsed since the Jali Commission's final report became publicly available, and it is therefore an .... as the 'core business' of the department. This was seen as .... the 2009/10–2013/14 DCS Strategic Plan did the department ...

  7. Nuclear Regulatory Commission issuances, May 1989

    1989-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  8. 76 FR 55424 - CFC-50 Commission

    2011-09-07

    ... conclude its work in approximately six months. 11. Termination. March 31, 2012. 12. Membership and... administrators of the campaign, participating charities and watchdog groups. These members will consist of both... Agency's approval, are responsible for directing the work of the Commission, including the creation of...

  9. Philippine Atomic Energy Commission: Annual report 1983

    1984-01-01

    This publication gives the highlights of the research and development projects of the Philippine Atomic Energy Commission in agriculture and food, nuclear fuels and power system technology, medicine, public health and nutrition, environmental surveillance, supportive basic research, social response to nuclear technology, nuclear licensing and safeguards, supportive technology and international and local linkages including manpower development. (ELC)

  10. Nuclear Regulatory Commission issuances, September 1987

    1987-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  11. Bundled Discounts and the Antitrust Modernization Commission

    Aaron Panner

    2007-01-01

    The Report of the Antitrust Modernization Commission devotes relatively little space to antitrust common law – the judge-made doctrine that governs unreasonable restraints of trade under Section 1 and monopolization under Section 2 of the Sherman Act.

  12. Nuclear Regulatory Commission issuances, May 1990

    1990-05-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances, May 1987

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Division B Commission 40: Radio Astronomy

    Chapman, Jessica M.; Giovaninni, Gabriele; Taylor, Russell; Carilli, Christopher; Hills, Richard; Hirabayashi, Hisashi; Jonas, Justin L.; Lazio, Joseph; Morganti, Raffaella; Nan, Rendong; Rubio, Monica; Shastri, Prjaval; Kellermann, Ken; Ekers, Ronald; Ohishi, Masatoshi

    2016-01-01

    IAU Commission 40 for Radio Astronomy (hereafter C40) brought together scientists and engineers who carry out observational and theoretical research in radio astronomy and who develop and operate the ground and space-based radio astronomy facilities and instrumentation. As of June 2015, the

  15. Nuclear Regulatory Commission issuances, July 1988

    1988-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission Issuances, October 1986

    1986-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. Nuclear Regulatory Commission issuances, February 1989

    1989-02-01

    This report includes the issuances received during the specified period from the Commission (CLl), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  18. Commissioning of the ATLAS Liquid Argon Calorimeters

    Cooke, Mark S

    2009-01-01

    A selection of ATLAS liquid argon (LAr) calorimeter commissioning studies are presented. These include a coherent noise study, a measurement of the quality of the physics pulse shape prediction, and energy and time reconstruction analyses with cosmic and single beam signals.

  19. Agency transformation and state public utility commissions

    Jones, Douglas N.

    2006-01-01

    The demise of public utility commissions has been periodically predicted (sometimes hoped for). In their long history they have been attacked by critics as ineffective, inefficient, expensive, or unnecessary. Further, the demonstrated survivability of the commission concept has often been uncharitably attributed to powerful political constituencies, self-preservation manoeuvrings by commissioners themselves, and inertia. The implications of this article point another way. Commission regulation of public utilities has survived mainly because of continued need for social oversight of these critical industry sectors and the capacity of PUCs strategically to adapt to fundamental changes in their surroundings. Two transformational upheavals are treated here - a challenge of flexibility and responsiveness by the dramatic run-up in costs and prices in the 1970s and challenge to relevance by the policy shift to greater reliance on market competition in the 1990s - and regulation's successful accommodation to them. Viewed this way commission regulation is more in a position of 'second wind' than 'last breath'. (author)

  20. Survey commission of the Manche center

    2002-01-01

    The subjects discussed during the Survey commission of the storage center of the Manche CSCM, held in october 2001, are presented in this document. They deal with the site survey, the maintenance facilities realized on this installations, the tritium survey in the water and the CSCM operating. (A.L.B.)

  1. Nuclear Regulatory Commission issuances, June 1987

    1987-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decision (DD), and the Denials of Petitions for Rulemaking (DPRM)

  2. Nuclear Regulatory Commission issuances, October 1989

    1989-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Commissioning for the European XFEL facility

    Nölle, D.

    2017-06-01

    The European XFEL is a 4th generation light source based on the Self Amplified Spontaneous Emission (SASE) FreeElectron-Laser concept. It is currently being commissioned in North- Germany. The core installation is a 17.5 GeV superconducting accelerator driving 3 SASE lines with photon energies from 1 to beyond 20 keV range with a maximum of 27.000 pulses per second. The international facility is organized as a limited liability company with shareholders from the contributing countries. DESY has taken over the leadership of the accelerator construction consortium, and will be in charge of the operation of the accelerator complex. The facility was set up with contributions from the 11 shareholder countries, either being hardware systems and/or staff or cash contributions. The construction is almost complete, and the commissioning phase has started by the end of 2015. This contribution will report the status of the accelerator complex with emphasis on the commissioning of the accelerator and an outlook to the commissioning of the SASE 1 FEL line.

  4. Commissioning of the RFQ1 injector

    Arbique, G.M.; Sheikh, J.Y.; Taylor, T.; Birney, L.F.; Davidson, A.D.; Wills, J.S.C.

    1987-01-01

    The RFQ1 accelerator is being developed at Chalk River to test the limits of the cw RFQ technology. A 50 kV injector has been built and is now being commissioned as the first phase of the program. This paper describes some of the innovative features of the RFQ1 injector and reports on initial operating experience

  5. Nuclear Regulatory Commission issuances, December 1990

    1990-12-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  6. Nuclear Regulatory Commission issuances, April 1991

    1991-04-01

    This report includes the issuances received during the specified period (April 1991) from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  7. Nuclear Regualtory Commission Issuances, October 1981

    1981-10-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors Denial (DD), and the Denial of Petitions for Rulemaking

  8. Status and commissioning of the CMS experiment

    Wulz, C.-E.

    2008-05-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  9. Status and Commissioning of the CMS Experiment

    Wulz, Claudia-Elisabeth

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented.

  10. Status and commissioning of the CMS experiment

    Wulz, C-E

    2008-01-01

    The construction status of the CMS experiment at the Large Hadron Collider and strategies for commissioning the subdetectors, the magnet, the trigger and the data acquisition are described. The first operations of CMS as a unified system, using either cosmic rays or test data, and the planned activities until the startup of the LHC are presented

  11. Nuclear Regulatory Commission issuances, April 1987

    1987-04-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  12. Nuclear Regulatory Commission Issuances, August 1986

    1986-08-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  13. Nuclear Regulatory Commission issuances, November 1988

    1988-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  14. Nuclear Regulatory Commission Issuances, March 1990

    1990-01-01

    The report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  15. Nuclear Regulatory Commission issuances, November 1987

    1987-01-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  16. Nuclear Regulatory Commission issuances, June 1990

    1990-06-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  17. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    D. Acosta

    Point 5 commissioning activities Since the last CMS week there has been little global commissioning activities: the first mid week global run aiming to assess the status of the hardware and DAQ software after the winter maintenance and developments has taken place two weeks ago involving all subdetectors but tracker and pixel whose hardware is still being actively worked on. The local commissioning restarted once the cooling became available again the third week of January. Below are detailed the main activities which have taken place so far. DAQ The activity of the central DAQ group during pause of global runs was focused on various items. The commissioning of the 900 new PCs which will be used to run the HLT processes has been almost completed. It is planned to use these PCs in the first global run at the start of March. In addition the location of various server PCs which host essential functionalities to get the private ".cms" network going, has been re-organized to allow to implemen...

  18. 76 FR 63325 - National Indian Gaming Commission

    2011-10-12

    ... General Accepted Accounting Principles (GAAP). Many comments stated that if this definition was amended... result in an enforcement action and closure order. 25 CFR 573.6(a)(7). II. Definitions--Net Revenues--management fee The NOI asked whether the Commission should consider whether the definition of net revenues...

  19. Nuclear Regulatory Commission issuances, February 1985

    1985-02-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  20. 76 FR 27034 - Equity and Excellence Commission

    2011-05-10

    .... The Commission will also make recommendations for restructuring school finance systems to achieve... educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in which Federal policies could address such disparities. The agenda for the...

  1. 75 FR 48661 - Equity and Excellence Commission

    2010-08-11

    .... The Commission will also make recommendations for restructuring school finance systems to achieve... educational opportunities that give rise to the achievement gap, with a focus on systems of finance, and recommend appropriate ways in which Federal policies could address such disparities. In order to achieve...

  2. Nuclear Regulatory Commission issuances, November 1990

    1990-11-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM)

  3. Securities and Exchange Commission Semiannual Regulatory Agenda

    2010-12-20

    ... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...: Alicia Goldin, Division of Trading and Markets, Securities and Exchange Commission, 100 F Street NE... Flexibility Analysis Required: Yes Agency Contact: Alicia Goldin, Division of Trading and Markets, Securities...

  4. Appalachian Regional Commission: 1982 Annual Report.

    Appalachian Regional Commission, Washington, DC.

    Fiscal year 1982 was transitional for the Appalachian Regional Commission (ARC), as it was the last year of the broad economic development program and a year of reduced funding and new limits on programs. In 1981, Congress had requested that ARC prepare a plan for completion of the Appalachian highway system and for a 3 to 5 year ARC finish-up…

  5. Appalachian Regional Commission: 1979 Annual Report.

    Appalachian Regional Commission, Washington, DC.

    Narrative text, tables, maps, and photographs present an overview of the Appalachian Regional Commission's (ARC) activities in fiscal year 1979, past achievements, and future goals. Major accomplishments of 1979 include: utilization of the $233 million appropriation for highway construction; approval of over $143 million in ARC funds for 985…

  6. KEPLER SCIENCE OPERATIONS

    Haas, Michael R.; Bryson, Steve T.; Dotson, Jessie L.; Koch, David G.; Smith, Marcie; Sobeck, Charles K.; Batalha, Natalie M.; Caldwell, Douglas A.; Jenkins, Jon M.; Van Cleve, Jeffrey E.; Hall, Jennifer; Klaus, Todd C.; Middour, Chris; Thompson, Richard S.; Kolodziejczak, Jeffrey; Stober, Jeremy

    2010-01-01

    Kepler's mission design includes a comprehensive plan for commissioning and science operations. The commissioning phase completed all critical tasks and accomplished all mission objectives within a week of the pre-launch plan. Since the start of science data collection, the nominal timeline has been interrupted by two safe-mode events, several losses of fine point, and some small pointing adjustments. The most important anomalies are understood and mitigated, so Kepler's technical performance has improved significantly over this period, and the prognosis for mission success is excellent. The Kepler data archive is established and hosting data for the science team, guest observers, and the public. The first data to become publicly available include the monthly full-frame images and the light curves for targets that are dropped from the exoplanet program or released after publication. Data are placed in the archive on a quarterly basis; the Kepler Results Catalog will be released annually starting in 2011.

  7. Design, commissioning and operation of the Swiss Light Source SLS

    Streun, Andreas

    2003-01-01

    The Swiss Light Source (SLS) at the Paul Scherrer Institute (PSI) is the most recent 3rd generation light source coming to operation. It consists of a 12- TBA storage ring of 288 m circumference providing 5 nm rad emittance at 2.4 GeV, a novel type of full energy booster synchrotron and a 100 MeV linac. The initial four beamlines cover protein X-ray crystallography (PX), materials science (MS), surface and interface spectroscopy (SIS) and microscopy (SIM). We will review the project history, describe the design concepts of the accelerators and the technical subsystems, and report on the commissioning process and the status of operation by end of 2002. (author)

  8. 1995 annual report. Ghana Atomic Energy Commission : using nuclear energy and techniques to alleviate hunger, diseases and control of environmental pollution

    1996-01-01

    The 1995 annual report reflects the activities of the Ghana Atomic Energy Commission (GAEC) on an institutional basis. It provides an overview of the outcomes achieved and the current activities of the GAEC grouped under its core nuclear science areas

  9. Science Programs

    Laboratory Delivering science and technology to protect our nation and promote world stability Science & ; Innovation Collaboration Careers Community Environment Science & Innovation Facilities Science Pillars Research Library Science Briefs Science News Science Highlights Lab Organizations Science Programs Applied

  10. Mixed reaction to science department proposal

    The recommendation last month by a presidential commission that a federal Department of Science and Technology be created to encompass “major civilian research and development (R&D) agencies” has elicited a mixed reaction from members of the geophysical sciences community.The Commission on Industrial Competitiveness, created by President Ronald Reagan in June 1983 to study ways to strengthen the ability of the United States to compete in a global marketplace, recommended establishment of a Cabinet-level science department “to promote national interest in and policies for research and technological innovation.” The commission, chaired by John A. Young, president of the Hewlett-Packard Company, was composed primarily of presidents and chief executive officers of major technology corporations but also included members of academia and government. Creation of a federal science and technology 'department is one of many suggestions contained in the commission's final report, Global Competition: The New Reality.

  11. Curriculum for Commissioning Energy Efficient Buildings

    Webster, Lia [Portland Energy Conservation, Inc., OR (United States)

    2012-12-27

    In July 2010, the U.S. Department of Energy (DOE) awarded funding to PECI to develop training curriculum in commercial energy auditing and building commissioning. This program was created in response to the high demand for auditing and commissioning services in the U.S. commercial buildings market and to bridge gaps and barriers in existing training programs. Obstacles addressed included: lack of focus on entry level candidates; prohibitive cost and time required for training; lack of hands-on training; trainings that focus on certifications & process overviews; and lack of comprehensive training. PECI organized several other industry players to create a co-funded project sponsored by DOE, PECI, New York State Energy and Research Development Authority (NYSERDA), California Energy Commission (CEC), Northwest Energy Efficiency Alliance (NEEA) and California Commissioning Collaborative (CCC). After awarded, PECI teamed with another DOE awardee, New Jersey Institute of Technology (NJIT), to work collaboratively to create one comprehensive program featuring two training tracks. NJIT’s Center for Building Knowledge is a research and training institute affiliated with the College of Architecture and Design, and provided e-learning and video enhancements. This project designed and developed two training programs with a comprehensive, energy-focused curriculum to prepare new entrants to become energy auditors or commissioning authorities (CxAs). The following are the key elements of the developed trainings, which is depicted graphically in Figure 1: • Online classes are self-paced, and can be completed anywhere, any time • Commissioning Authority track includes 3 online modules made up of 24 courses delivered in 104 individual lessons, followed by a 40 hour hands-on lab. Total time required is between 75 and 100 hours, depending on the pace of the independent learner. • Energy Auditor track includes 3 online modules made up of 18 courses delivered in 72 individual

  12. Geothermal research and development program of the US Atomic Energy Commission

    Werner, L. B.

    1974-01-01

    Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

  13. Report of Inquiry Commission (1) on Superphenix and the fast neutron reactor system. Vol. 2. Hearings

    Galley, Robert; Bataille, Christian

    1998-01-01

    This document is a two-volume report, made on behalf of the Inquiry Commission of French National Assembly, concerning the issue of Superphenix and the fast neutron reactor system. The first volume contains the report while the second presents the accounts of 27 hearings in the Inquiry Commission. Questions concerning the technical aspects, costs of decommissioning operations, environment and social impacts, etc, are addressed and discussed with officials implied in nuclear safety, environment protection, science and technology, trade unions, education, atomic energy agency, military applications, industry and commerce. The conclusions drawn from these hearings were synthesized in the volume one of the report submitted to the French National Assembly by the Inquiry Commission

  14. Optimization of the commissioning period of nuclear power plant

    Hou Ganglian; Li Chunyue

    2014-01-01

    Due to current equipment manufacture capacity, construction experience and other factors, commissioning of nuclear power projects was used to be postponed, which could lead to delay of the whole project. Based on the actual situation, optimization of commissioning period and its logic could be an effective way to improve this situation to some extent. Based on previous practice and experience in the schedule management for the commissioning nuclear power projects, this paper analyzes and discusses the characteristics of make commissioning plan and the difficulties of program implementation and strategies of commissioning plan optimization, discusses and presents ways of dynamic plan adjustment and optimization at the vision of entire project, synthesizes the methods of time management through commissioning itself, interface and management, expounds measures for the timing and optimization of commissioning schedule and commissioning period, and sums up the ways of optimization of commissioning period, improving management capabilities and control of optimization principles. (authors)

  15. Commissioning of long subsea pipelines - environmental aspects

    Falck, C.; Kleppe, T.; Maribu, J.

    1997-01-01

    Discharges to air and sea are inevitable during precommissioning and commissioning of long subsea pipelines. Large quantities of water is pumped through the pipeline during these operations. This water is normally treated with corrosion inhibiting chemicals to minimise internal corrosion of the pipeline. Chemicals like methanol or glycol may be used to prevent hydrate formation, and will normally be discharged to sea during commissioning. In order to minimise the environmental impact of these operations, while maintaining corrosion protection, the Norwegian Statoil has been working for several years along three main routes such as to develop concepts and methods that minimise the discharged volumes, the use of the most environmentally friendly chemicals available, and to monitor and identify the effects of discharges to various marine species. 3 refs., 4 figs

  16. Programme of the Commission for 1978. [Booklet

    1978-01-01

    Mr. Jenkins, President of the Commission, first examines the problem of the economy and the level of its unemployment in the Community, resulting in a lack of growth. He than presents the two-fold aim of the Commission--to instigate emergency action to sustain industries that are no longer fully competitive and to promote economic growth to provide employment and prosperity. He then examins the energy and agriculture sectors. Two obligations cited for the Community are: (1) to defend Community interests in the energy field in relation to Third World Countries, and (2) to make clear the connections between energy policy and the general economic strategy. Negotiations are underway for enlargement of the community with applications being considered for Greece, Portugal, and Spain. A memorandum annexed to the address contains additional material on building an integrated economic unit, the European citizen and his environment, Europe in the world, and enlargement of the community. (MCW)

  17. LHC Damper Beam commissioning in 2010

    Höfle, W; Schokker, M; Valuch, D

    2011-01-01

    The LHC transverse dampers were commissioned in 2010 with beam and their use at injection energy of 450 GeV, during the ramp and in collisions at 3.5 TeV for Physics has become part of the standard operations pro- cedure. The system proved important to limit emittance blow-up at injection and to maintain smaller than nominal emittances throughout the accelerating cycle. We describe the commissioning of the system step-by-step as done in 2010 and summarize its performance as achieved for pro- ton as well as ion beams in 2010. Although its principle function is to keep transverse oscillations under control, the system has also been used as an exciter for abort gap clean- ing and tune measurement. The dedicated beam position measurement system with its low noise properties provides additional possibilities for diagnostics.

  18. Activity report 2015 Commission Perspectives du Reseau

    Ricour, Olivia

    2016-01-01

    This document contains the activity report for 2015 of the Commission Perspectives du Reseau which has been set up by RTE to be the main body for organising a dialogue with all the actors of the energy sector and civil society about challenges and stakes of the electric power system on the medium and on the long term. It describes how this body aims at sharing knowledge and expertise of all stakeholders (publications, European platform for data transparency), at being a place for debating and enriching the understanding of tomorrow's important stakes for the power system (discussion of the issue of greenhouse gas emissions with an analysis of the impact of the CO 2 price signal on emissions by the European electricity system and results of the e-Highway 2050 European project). The road-map of the Commission works for 2016 is provided, as well as a list of members

  19. Nuclear Regulatory Commission issuances, May 1993

    1993-05-01

    This report contains the issuances received during the specified period (May 1993) from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not deemed a part of these opinions or have any independent legal significance. Contents of this document include an Issuance of the Nuclear Regulatory Commission with respect to the Sacramento Municipal Utility District and Issuances of Directors' Decisions concerning the Interstate Nuclear Service Corporation; Niagara Mohawk Power Corporation; and Texas Utilities Electric Company, et al. and All Nuclear Power Plants with Thermo-Lag Fire Barriers

  20. Nuclear Regulatory Commission Information Digest 1992 edition

    Olive, K.

    1992-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. This digest is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and industry it regulates. In general, the data cover 1975 through 1991, with exceptions noted. Information on generating capacity and average capacity factor for operating US commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed

  1. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    A. Ryd and T. Camporesi

    2010-01-01

    Commissioning and Run Coordination activities After the successful conclusion of the LHC pilot run commissioning in 2009 activities at the experiment restarted only late in January due to the cooling and detector maintenance. As usual we got going with weekly exercises used to deploy, debug, and validate improvements in firmware and software. A debriefing workshop aimed at analyzing the operational aspects of the 2009 pilot run was held on Jan. 15, 2009, to define a list of improvements (and relative priorities) to be planned. In the last month, most of the objectives set in the debriefing workshop have been attained. The major achievements/improvements obtained are the following: - Consolidation of the firmware for both readout and trigger for ECAL - Software implementation of procedures for raising the bias voltage of the silicon tracker and pixel driven by LHC mode changes with automatic propagation of the state changes from the DCS to the DAQ. The improvements in the software and firmware allow suppress...

  2. Commissioning of the TRIUMF ISAC RF system

    Fong, K.; Fang, S.; Laverty, M.; Lu, J.; Poirier, R.L.

    2001-09-01

    The ISAC RF system at present consists of a Radio Frequency Quadrupole accelerator, five Drift Tube Linear Accelerators, six bunchers, two choppers and a bunch rotator. The RFQ operates at the fundamental frequency of 35.36 MHz, while the DTLs operate at the third harmonic frequency of 106.08 MHz. The operating power ranges from 45 W to 120 W for the choppers, 1 kW to 20 kW for the DTLs and bunchers, and 80 kW for the RFQ. These cavities have been commissioned to operate synchronously with both closed-loop amplitude and phase regulation, as well as automatic tuning of the cavities. This paper gives a brief summary of the commissioning experience. (author)

  3. Status of the SPIRAL2 injector commissioning

    Thuillier, T., E-mail: thuillier@lpsc.in2p3.fr; Angot, J.; Jacob, J.; Lamy, T.; Sole, P. [LPSC, Université Grenoble Alpes, CNRS/IN2P3, 53 rue des Martyrs, 38026 Grenoble Cedex (France); Barué, C.; Bertrand, P.; Canet, C.; Ferdinand, R.; Flambard, J.-L.; Jardin, P.; Lemagnen, F.; Maunoury, L.; Osmond, B. [GANIL, CNRS/IN2P3, Bvd Henri Becquerel, BP 55027, 14076 Caen Cedex 5 (France); Biarrotte, J. L. [IPN Orsay, Université Paris Sud, CNRS/IN2P3, 15 rue Georges Clémenceau, 91406 Orsay Cedex (France); Denis, J.-F.; Roger, A.; Touzery, R.; Tuske, O.; Uriot, D. [Irfu, CEA Saclay, DSM/Irfu/SACM, 91191 Gif Sur Yvette (France); and others

    2016-02-15

    The SPIRAL2 injector, installed in its tunnel, is currently under commissioning at GANIL, Caen, France. The injector is composed of two low energy beam transport lines: one is dedicated to the light ion beam production, the other to the heavy ions. The first light ion beam, created by a 2.45 GHz electron cyclotron resonance ion source, has been successfully produced in December 2014. The first beam of the PHOENIX V2 18 GHz heavy ion source was analyzed on 10 July 2015. A status of the SPIRAL2 injector commissioning is given. An upgrade of the heavy ion source, named PHOENIX V3 aimed to replace the V2, is presented. The new version features a doubled plasma chamber volume and the high charge state beam intensity is expected to increase by a factor of 1.5 to 2 up to the mass ∼50. A status of its assembly is proposed.

  4. Nuclear Regulatory Commission Information Digest, 1991 edition

    Olive, K.L.

    1991-03-01

    The Nuclear Regulatory Commission Information Digest provides a summary of information about the US Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, and the areas NRC licenses. This digest is a compilation of NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1990, with exceptions noted. For operating US commercial nuclear power reactors, information on generating capacity and average capacity factor is obtained from Monthly Operating Reports submitted to the NRC directly by the licensee. This information is reviewed for consistency only. No independent validation and/or verification is performed by the NRC. For detailed and complete information about tables and figures, refer to the source publications. This digest is published annually for the general use of the NRC staff and is available to the public. 30 figs., 12 tabs

  5. Nuclear Regulatory Commission issuances, September 1988

    1988-09-01

    This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Appeal Boards (ALAB), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judge (ALJ), the Directors' Decisions (DD), and the Denials of Petitions for Rulemaking (DPRM). The summaries and headnotes preceding the opinions reported herein are not to be deemed a part of those opinions or to have any independent legal significance

  6. Securities and Exchange Commission Semiannual Regulatory Agenda

    2010-04-26

    ...: 3235-AK58 420. REVISIONS TO REGULATION D Legal Authority: 15 USC 77b(a)(15); 15 USC 77b(b); 15 USC 77d; 15 USC 77r; 15 USC 77s; 15 USC 77s(a); 15 USC 77z-3 Abstract: The Division is considering... SOLICITATION ENHANCEMENTS Legal Authority: 15 USC 78n Abstract: The Commission proposed amendments to its proxy...

  7. Indexes to Nuclear Regulatory Commission Issuances

    1996-01-01

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors' Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index

  8. European commission report on market opening

    Anon.

    2005-01-01

    Governments must step up their effort to implement measures relating to market opening within the framework of the directives on gas and electricity. Only greater integration of national markets will produce the improvements required from a competitive point of view on the domestic energy market. These are the main conclusions of the annual report on domestic electricity and gas market operation adopted by the European Commission at the beginning of January 2005. (author)

  9. Indexes to Nuclear Regulatory Commission Issuances

    NONE

    1996-12-31

    Digests and indexes for issuances of the Commission (CLI), the Atomic Safety and licensing Board Panel (LBP), the Administrative Law Judges (ALJ) the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM) are presented in this document. These digests and indexes are intended to serve as a guide to the issuances. Information elements are displayed in one or more of five separate formats arranged as follows: Case Name Index; Headers and Digests; Legal Citations Index; Subject Index; and Facility Index.

  10. COMMISSIONING CNI PROTON POLARIMETERS IN RHIC

    HUANG, H.; BRAVAR, A.; LI, Z.; MACKAY, W.W.; MAKDISI, Y.; RESCIA, S.; ROSER, T.; SURROW, B.; BUNCE, G.; DESHPANDE, A.; GOTO, Y.; ET AL

    2002-01-01

    Two polarimeters based on proton carbon elastic scattering in the Coulomb Nuclear Interference (CNI) region have been installed and commissioned in the Blue and Yellow rings of RHIC during the first RHIC polarized proton collider run. Each polarimeter consists of ultra-thin carbon targets and six silicon detectors. With newly developed wave form digitizers, they provide fast and reliable polarization information for both rings

  11. Philippine Atomic Energy Commission: Annual report 1982

    1983-02-01

    This publication enumerates the research and development activities of the Philippine Atomic Energy Commission with priorities geared towards achieving the economic and social upliftment of the Filipinos in the field of agriculture, energy, industry, health and environment. Highlights are summaries of investigations and studies of great importance in crop improvement, animal production, nuclear fuels, nutrition research, not to mention its supportive technology, technical services, nuclear information and public acceptance, and nuclear manpower development. (RTD)

  12. Science and Science Fiction

    Oravetz, David

    2005-01-01

    This article is for teachers looking for new ways to motivate students, increase science comprehension, and understanding without using the old standard expository science textbook. This author suggests reading a science fiction novel in the science classroom as a way to engage students in learning. Using science fiction literature and language…

  13. Commissioning an Engineering Scale Coal Gasifier

    Reid, Douglas J.; Bearden, Mark D.; Cabe, James E.

    2010-07-01

    This report explains the development, commissioning, and testing of an engineering scale slagging coal gasifier at PNNL. The initial objective of this project was to commission the gasifier with zero safety incidents. The commissioning work was primarily an empirical study that required an engineering design approach. After bringing the gasifier on-line, tests were conducted to assess the impact of various operating parameters on the synthesis gas (syngas) product composition. The long-term intent of this project is to produce syngas product for use by internal Pacific Northwest National Laboratory (PNNL) researchers in catalyst, materials, and instrumentation development. Future work on the project will focus on improving the reliability and performance of the gasifier, with a goal of continuous operation for greater than 4 hours using coal feedstock. In addition, alternate designs that allow for increased flexibility regarding the fuel sources that can be used for syngas production is desired. Continued modifications to the fuel feed system will be pursued to address these goals. Alternative feed mechanisms such as a coal/methanol slurry are being considered.

  14. Nuclear Regulatory Commission Information Digest: 1993 edition

    1993-03-01

    The Nuclear Regulatory Commission Information Digest (digest) provides a summary of information about the U.S. Nuclear Regulatory Commission (NRC), NRC's regulatory responsibilities, the activities NRC licenses, and general information on domestic and worldwide nuclear energy. The digest, published annually, is a compilation of nuclear- and NRC-related data and is designed to provide a quick reference to major facts about the agency and the industry it regulates. In general, the data cover 1975 through 1992, with exceptions noted. Information on generating capacity and average capacity factor for operating U.S. commercial nuclear power reactors is obtained from monthly operating reports that are submitted directly to the NRC by the licensee. This information is reviewed by the NRC for consistency only and no independent validation and/or verification is performed. Comments and/or suggestions on the data presented are welcomed and should be directed to Karen Olive, United States Nuclear Regulatory Commission, Office of the Controller, Division of Budget and Analysis, Washington, D.C. 20555. For detailed and complete information about tables and figures, refer to the source publications

  15. NSLS-II commissioning and operation

    Wang, G., E-mail: gwang@bnl.gov; Shaftan, T.; Bassi, G.; Bengtsson, J.; Blednykh, A.; Blum, E.; Cheng, W.; Choi, J.; Davidsaver, M.; Doom, L.; Fliller, R.; Ganetis, G.; Guo, W.; Hidaka, Y.; Kramer, S.; Li, Y.; Podobedov, B.; Qian, K.; Rose, J.; Seletskiy, S. [Brookhaven National Laboratory, Upton, NY 11973 (United States); and others

    2016-07-27

    The National Synchrotron Light Source II at Brookhaven National Lab is a third-generation synchrotron radiation facility that has been commissioned in 2014. The facility is based on a 3 GeV electron storage ring, which will circulate 500 mA of beam current at 1 nm rad horizontal emittance. The storage ring is 792 meters in circumference and will accommodate more than 60 beamlines in the final built-out. The beamline sources range from insertion-devices located in straight sections, bending magnets or three-pole-wigglers configured in multiple branches. The NSLS-II storage ring commissioning was successfully completed in July 2014 and the facility delivered the first user light on October 23, 2014. Currently the storage ring reached 300 mA beam current and achieved 1 nm rad of horizontal emittance with 3 sets of Damping Wigglers. At this point six NSLS-II project beamlines are routinely taking photons with beam current at 150 mA. This paper reviews the NSLS-II accelerator design and commissioning experience.

  16. CEBAF Cryomodule Commissioning in the South Linac

    M. Drury; H. Lankford; T. Lee; J. Marshall; J. Preble; Q. Saulter; W. Schneider; Michael Spata; Mark Wiseman

    1993-01-01

    When complete, the Continuous Electron Beam Accelerator Facility will house a 4 GeV recirculating linear accelerator containing 42 1/4 cryomodules arrayed in two antiparallel linacs and an injector. Currently, 38 1/4 cryomodules have been installed. Each cryomodule contains eight superconducting niobium 5-cell rf cavities that operate at 1.497 GHz[1]. A cryomodule must provide an energy gain of 20 MeV to the 200 mu-A beam[2]. The resultant dynamic heat load must be less than 45 W. The cavity parameters that are measured during the commissioning process include the external Q's (Q(sub ext)) of the cavity ports, the unloaded Q (Q(sub 0)) of the cavity as a function of accelerating gradient, and the maximum operating gradient of the cavity[3]. Finally, the mechanical tuners are cycled and characterized. A portable test stand allows local control of the rf system and provides automated data acquisition. During the period from April 1993 through September 1993, 16 of the 20 cryomodules installed in the South Linac were commissioned. All cryomodules tested in the South Linac meet or exceed the CEBAF specifications. This paper describes the results of the commissioning of the first 10 cryomodules in the South Linac

  17. Interim Report of the Commission to Review the Effectiveness of the National Energy Laboratories

    Cohon, Jared L. [Carnegie Mellon Univ., Pittsburgh, PA (United States); Glauthier, T. J. [TJG Energy Associates, LLC., Bloomberg, VA (United States); Augustine, Norman R. [U.S. Dept. of Homeland Security, Washington, DC (United States); Austin, Wanda M. [Aerospace Corporation, El Segundo, CA (United States); Elachi, Charles [California Inst. of Technology (CalTech), Pasadena, CA (United States); Fleury, Paul A. [Yale Univ., New Haven, CT (United States); Hockfield, Susan J. [Massachusetts Inst. of Technology (MIT), Cambridge, MA (United States); Meserve, Richard A. [Covington and Burling LLP, Washington, DC (United States); Murray, Cherry A. [Harvard Univ., Cambridge, MA (United States)

    2015-02-27

    The Commission to Review the Effectiveness of the National Energy Laboratories was charged by Congress in January 2014 to evaluate the mission, capabilities, size, performance, governance, and agency oversight of the 17 Department of Energy (DOE) laboratories. Given the incredibly broad scope and aggressive timeline (the original deadline was February 2015), the Secretary of Energy and Congress agreed to split the task into two phases. This interim report contains the preliminary observations and recommendations gleaned from Phase 1 of the study, which consisted of a literature review; visits to five of the National Laboratories; semi-structured interviews with staff from across the National Laboratories, DOE, other Federal agencies, companies, other non-governmental organizations, and additional interested parties; and presentations at monthly public Commission meetings. The Commission notes that the purpose of the National Laboratories is to provide critical capabilities and facilities in service of DOE’s mission and the needs of the broader national and international science and technology (S&T) community, including other Federal agencies, academia, and private industry. The National Laboratories are successfully fulfilling that mission today. While the Commission believes significant improvements can be made to many aspects of DOE management and governance of the laboratories, those issues do not detract from the National Laboratories’ remarkable contributions to the American public. In Phase 2 the Commission will focus on ways to make the process of carrying out their missions more efficient and effective.

  18. Organisation of the National Atomic Energy Commission. Decree-Law N` 22.498 (19-Dec-1956; B.O. 28-Dec-1956). Ratified by Law 14.467/58; Organizacion de la Comision Nacional de Energia Atomica. Decreto-Ley N` 22.498 (19-dic-1956; B.O. 28-dic-1956). Ratificada por Ley 14.467/58

    NONE

    1957-12-31

    Organization of the National Atomic Energy Commission of the Argentine Republic. Organic law through which this institution shall function as an autonomous entity, empowered to act publicly and privately in scientific, technical, industrial, commercial, administrative and financial matters. Its purposes will be the scientific and industrial promotion, execution, research and application of nuclear transmutations. Also to control the applications of nuclear energy for reasons of public usefulness in order to prevent the damages they could cause. It establishes that the CNEA will be administered by a Board of Directors composed by a Chairman and five members, who will have attributions and duties such as advise the Executive Power of the Argentine Republic in matters related to the atomic energy and their applications and the necessary precautions for the protection against atomic dangers. This Board of Directors will need the authorization of the Executive Power to undertake some activities such as the exportation of nuclear materials or enter into contracts and agreements with societies with the Argentine provinces for the exploitation of nuclear deposits and mines.

  19. Science transfer for development

    Salam, A.

    1985-01-01

    Despite the recent realisation that science and technology are the sustenance and major hope for economic betterment, the third world, barring a few countries like Argentina, Brazil, China and India, has taken to science - as distinct from technology - as only a marginal activity. This is also true of the aid - giving agencies of the richer countries, of the agencies of the UN and also unfortunately of the scientific communities of the developed countries which might naturally be expected to be the Third World's foremost allies. Policy makers, prestigious commissions (like the Brandt Commission) as well as aid-givers, speak uniformly of problems of technology transfer to the developing countries as if that is all that is involved. Very few within the developing world appear to stress that for long term effectiveness, technology transfers must always be accompanied by science transfers; that the science of today is the technology of tomorrow. Science transfer is effected by and to communities of scientists. Such communities (in developing countries) need building up to a critical size in their human resources and infrastructure. This building up calls for wise science policies, with long term commitment, generous patronage, self governance and free international contacts. Further, in our countries, the high level scientist must be allowed to play a role in nation building as an equal partner to the professional planner, the economist and the technologist. Few developing countries have promulgated such policies: few aid agencies have taken it as their mandate to encourage and help build up the scientific infrastructure. (author)

  20. 17 CFR 146.9 - Appeals to the Commission.

    2010-04-01

    ... Commission or any Commission employee has failed or refused to comply with provisions of the Privacy Act or... disagreement has been filed shall clearly note the portion which is disputed, and include a copy of the...

  1. Commissioning of Nuclear Power Plants. The AREVA approach

    Mateo, G.

    2014-01-01

    Georges Mateo, Fellow Expert at AREVA, closed the last day of conferences by detailing deeply the different phases of NPPs commissioning. He insisted on the skills required to be a Commissioning engineer and on the carrier opportunities that it offers

  2. Decommissioning and radioactive waste management. The European Commission overview

    Rehak, M

    2010-01-01

    In this lecture author deals with the European Commission overview on the decommissioning and radioactive waste management. Financial support of European Commission of decommissioning of the Ignalina NPP, Bohunice V1 NPP and Kozloduy Units 1 and 2 is presented.

  3. International Commission on Radiological Protection. History, policies, procedures

    Lindell, Bo; Dunster, H.J.; Valentin, Jack; )

    2000-01-01

    This report briefly reviews the history, mode of operation, concepts, and current policies of the International Commission on Radiological Protection (ICRP). It touches upon the objectives of the Commission's recommendations, the quantities used, the biological basis of the Commission's policy, the quantitative basis for its risk estimates, the structure of the system of protection, some problems of interpretation and application in that system, and the need for stability, consistency, and clarity in the Commission's recommendations. (author)

  4. Federal Energy Regulatory Commission fiscal year 1997 annual financial statements

    NONE

    1998-02-24

    This report presents the results of the independent certified public accountants` audit of the Federal Energy Regulatory commission`s statements of financial position, and the related statements of operations and changes in net position. The auditors` work was conducted in accordance with generally accepted government auditing standards. An independent public accounting firm conducted the audit. The auditors` reports on the Commission`s internal control structure and compliance with laws and regulations disclosed no reportable conditions or instances of noncompliance.

  5. Stepwise commissioning of a steam boiler with stability guarantees

    Johansen, Simon Vestergaard; Kallesøe, Carsten Skovmose; Bendtsen, Jan Dimon

    2016-01-01

    This paper aims to make the commissioning of an industrial MIMO controller more straightforward by gradually commissioning it from a set of SISO controllers, after the system has been started. For this purpose a stepwise commissioning strategy based on the Youla-Kucera parametrization has been de...... been commissioned from a SISO controller using the developed method on a real steam boiler and measurements show a clear performance improvement after transition....

  6. C46 `ASTRONOMY Education and Development': a Peculiar Commission

    de Greve, Jean-Pierre; García, Beatriz; Gerbaldi, Michèle; Ferlet, Roger; Guinan, Edward; Hearnshaw, John; Jones, Barrie; Marschall, Laurence; Miley, George; Pasachoff, Jay; Ros, Rosa; Stavinschi, Magda; Torres-Peimbert, Silvia

    2016-04-01

    C46 was a Commission of the Executive Committee of the IAU under Division XII (Union-Wide Activities), then after 2012 under Division C (Education, Outreach, and Heritage). It was the only commission dealing exclusively with astronomy education; a previous Commission 38 (Exchange of Astronomers), which allocated travel grants to astronomers who needed them, and a Working Group on the Worldwide Development of Astronomy, have been absorbed by Commission 46.

  7. Point Lepreau G.S. commissioning management experience

    Alikhan, S.; Walker, W.J.

    1983-05-01

    This paper shares the experience gained by New Brunswick Power in commissioning its first nuclear plant, with particular emphasis on the management techniques that were developed. Some of the areas discussed include: organization of Nuclear Operations Group responsible for commissioning and its interface with construction; outline and scope of documentation required to define, execute and report commissioning to satisfy the licensing requirements, management techniques developed to implement commissioning; and a summary of lessons learned and recommendations for the future

  8. Commissioning of the ATLAS pixel detector

    Golling, Tobias

    2008-01-01

    The ATLAS pixel detector is a high precision silicon tracking device located closest to the LHC interaction point. It belongs to the first generation of its kind in a hadron collider experiment. It will provide crucial pattern recognition information and will largely determine the ability of ATLAS to precisely track particle trajectories and find secondary vertices. It was the last detector to be installed in ATLAS in June 2007, has been fully connected and tested in-situ during spring and summer 2008, and is ready for the imminent LHC turn-on. The highlights of the past and future commissioning activities of the ATLAS pixel system are presented

  9. Nuclear Regulatory Commission issuances, March 1975

    1975-04-01

    Reactor licensing actions taken by the Nuclear Regulatory Commission, the Atomic Safety and Licensing Appeal Board and the Atomic Safety and Licensing Boards for March 1975 are presented. Action was included for the following reactors: Big Rock Point Nuclear Plant; West Valley Reprocessing Plant; Limerick Generating Station, Units 1 and 2; Midland Plants, Units 1 and 2; Wolf Creek Generating Station, Unit 1; Monticello Nuclear Generating Plant, Unit 1; Douglas Point Nuclear Generating Station, Units 1 and 2; Seabrook Station, Units 1 and 2; Vermont Yankee Nuclear Power Station; and WPPSS Hanford Units 1 and 4. (U.S.)

  10. The ATLAS Trigger System Commissioning and Performance

    Hamilton, A

    2010-01-01

    The ATLAS trigger has been used very successfully to collect collision data during 2009 and 2010 LHC running at centre of mass energies of 900 GeV, 2.36 TeV, and 7 TeV. This paper presents the ongoing work to commission the ATLAS trigger with proton collisions, including an overview of the performance of the trigger based on extensive online running. We describe how the trigger has evolved with increasing LHC luminosity and give a brief overview of plans for forthcoming LHC running.

  11. Commission of energy regulation. 2004 activity report

    2004-01-01

    The commission of energy regulation (CRE) is an independent administrative authority in charge of the control of the operation of gas and electricity markets. This document is the fifth activity report of CRE and covers the July 1, 2003 - June 30, 2004 period, which corresponds to the era of opening of energy markets as a consequence of the enforcement of the June 26, 2003 European directive. In the framework of the stakes made by energy markets liberalization, this document presents the situation of the gas and electricity markets during this period (European framework, regulation of both markets, public utility mission..) and describes CRE's means for the monitoring of these markets. (J.S.)

  12. Nuclear Regulatory Commission: 1981 annual report

    1981-01-01

    This seventh annual report of the US Nuclear Regulatory Commission covers major actions, events and planning that occurred during fiscal year 1981, with some coverage of later events, where appropriate. Chapters of the report address the agency's various functions or areas of activity: regulating nuclear power plants; evaluating reactor operating experience; licensing nuclear materials and their transportation; safeguarding nuclear plants and materials; managing nuclear wastes; inspection and enforcement; cooperation with state governments; international activities; research and standards development; hearings; decisions and litigation; and administrative and public communications matters. Each chapter presents a detailed review of program accomplishments during the report period, fiscal year 1981

  13. Gentilly 2: design, construction and commissioning

    Amyot, Paul; Michel, Benoit.

    1982-06-01

    Construction of the Gentilly 2 power station is essentially complete, and commissioning is proceeding. The main activities during the 1981-82 period have been the completion of the construction and overall testing of the major systems. One cause of delay in the project in 1981 was the discovery of damage to the tubesheet of a steam generator. An internal manhole cover support in the steam generator head had become loose and had caused damage to the tube-to-tubesheet welds. Repairs to the welds were completed in Feb. 1982 after an extensive development program to qualify the welding procedure. Overall project life will be slightly more than 9 years

  14. Commissioning dosimetry at SINAGAMA irradiation facility

    Noriah Mod Ali; Hasan Sham; Taiman Kadni

    2000-01-01

    Dose mapping is one of the important factors in the commissioning of the irradiation plant. Comparison of the dose distribution obtained through the dose mapping exercise carried out since 1991 for Sinagama plant are described in this paper. It is aimed to confirmed the need for a thorough dose-mapping before the plant can be proceed with routine irradiation. The dose measurement was performed using a routine ceric-cerous dosimeter, supplied by the High Dose Dosimetry Laboratory, SSDL. The quality assurance of these service was maintain and verify through regular participation in dose intercomparison organised by the IAEA

  15. Commission 22: Meters, Meteorites and Interplanetary Dust

    Watanabe, Junichi; Jenniskens, Peter; Spurný, Pavel; Borovička, Jiří; Campbell-Brown, Margaret; Consolmagno, Guy; Jopek, Tadeusz; Vaubaillon, Jeremie; Williams, Iwan P.; Zhu, Jin

    2010-05-01

    The business meeting of commission 22 was held at the room 5 in the SulAmerica Convention Center in Rio de Janeiro(14:00-15:30). Fifteen people attended at this meeting:J.Borovička, E.Bowell, G.Consolmagno, D.Green, P. Jenniskens, A. Pellinen-Wannberg, R. Rudawska, J. Watanabe, J. Zhu, P. H. A. Hasselmann, F. Ostroviski, D. A. Oszkiewicz, W. Thuillot, P. Mahajani, and A. Sule. This meeting was managed by Junichi Watanabe, the current C22 Vice-President. The summary of the meeting is described.

  16. Cognitive Enhancement and Beyond: Recommendations from the Bioethics Commission.

    Allen, Anita L; Strand, Nicolle K

    2015-10-01

    Media outlets are reporting that cognitive enhancement is reaching epidemic levels, but evidence is lacking and ethical questions remain. The US Presidential Commission for the Study of Bioethical Issues (Bioethics Commission) has examined the issue, and we lay out the commission's findings and their relevance for the scientific community. Published by Elsevier Ltd.

  17. 77 FR 8095 - Technical Corrections to Commission Regulations

    2012-02-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission 18 CFR Part 2 [Docket No. RM11-30-000; Order No. 756] Technical Corrections to Commission Regulations Issued February 8, 2012. AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule: correcting amendment. SUMMARY: This document adds...

  18. 75 FR 73083 - Sunshine Act Meeting; Open Commission Meeting

    2010-11-29

    ... FEDERAL COMMUNICATIONS COMMISSION Sunshine Act Meeting; Open Commission Meeting November 30, 2010. The Federal Communications Commission will hold an Open Meeting on the subjects listed below on... demonstrate accessibility technologies. The meeting site is fully accessible to people using wheelchairs or...

  19. Commission administration. National Low-Level Radioactive Waste Management Program

    1984-09-01

    This report is one in a series of commission option documents prepared for the US Department of Energy, designed to assist regional low-level waste compact commissions in their organization, administration and efforts to effectively manage waste within their regions. In particular, this report addresses topics related to commission administrative procedures, personnel, procurement and finance

  20. 47 CFR 0.420 - Other Commission publications.

    2010-10-01

    ... 47 Telecommunication 1 2010-10-01 2010-10-01 false Other Commission publications. 0.420 Section 0... Information Printed Publications § 0.420 Other Commission publications. The following additional Commission publications may be purchased from the Superintendent of Documents: (a) Statistics of Communications Common...

  1. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  2. 76 FR 71449 - Reporting Line for the Commission's Ethics Counsel

    2011-11-18

    ... Ethics Counsel AGENCY: Securities and Exchange Commission. ACTION: Final rule. SUMMARY: The Securities... of the Ethics Counsel is now a stand-alone Office of the Commission and that the head of the Office, the Ethics Counsel, reports directly to the Chairman of the Commission. DATES: Effective Date...

  3. Educational Change by Commission: Attempting "Trickle Down" Reform.

    Ginsberg, Rick; Wimpelberg, Robert K.

    1987-01-01

    The processes and procedures of national commissions on education are discussed. Elements of commonality are presented with a review of competing explanations of the popularity of such commissions. A sociopolitical thesis of educational reform through commissions is advanced, based on the "trickle down" theory of economics. (SLD)

  4. 17 CFR 9.26 - Participation of Commission staff.

    2010-04-01

    ... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Participation of Commission staff. 9.26 Section 9.26 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION RULES... Respect to Appeals § 9.26 Participation of Commission staff. Within twenty days after receipt of the...

  5. 76 FR 24383 - Commission's Rules of Practice, Procedure, and Organization

    2011-05-02

    ... FEDERAL COMMUNICATIONS COMMISSION 47 CFR Parts 0 and 1 [GC Docket No. 10-44; FCC 11-16] Commission... docket management measures, such as broadening the use of docketed proceedings; expanding the requirement... effective date for FCC rules in the event the Commission does not specify an effective date in a rulemaking...

  6. 77 FR 58941 - Appeal Proceedings Before the Commission

    2012-09-25

    ... forth more specific rules for the different types of appeals. Rules for appeals of ordinance..., 582, 583, 584, and 585 RIN 3141-AA47 Appeal Proceedings Before the Commission AGENCY: National Indian... Commission) promulgates this final rule to enhance and clarify appeal proceedings before the Commission. This...

  7. Report of the Nevada Commission on Nuclear Projects

    1986-11-01

    This summary represents the major conclusions reached by the Commission on Nuclear Projects. They reflect the Commission's experience with the high-level nuclear waste disposal program since 1985 and are the result of the Commission's scrutiny of both State and federal repository-related activities

  8. 78 FR 78352 - Orlando Utilities Commission; Notice of Filing

    2013-12-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ14-4-000] Orlando Utilities Commission; Notice of Filing Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): Order No. 1000 Further Regional Compliance Filing to be effective...

  9. 76 FR 25685 - Orlando Utilities Commission; Notice of Filing

    2011-05-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-000] Orlando Utilities Commission; Notice of Filing Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to be effective 4/15/2011. Any person...

  10. 76 FR 35209 - Orlando Utilities Commission; Notice of Filing

    2011-06-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-001] Orlando Utilities Commission; Notice of Filing Take notice that on May 26, 2011, Orlando Utilities Commission submitted its tariff filing per 35.17(b): Amendment to Compliance Filing to be effective 4/15/2011. Any...

  11. 75 FR 37789 - Orlando Utilities Commission; Notice of Filing

    2010-06-30

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ10-2-000] Orlando Utilities Commission; Notice of Filing June 23, 2010. Take notice that on June 11, 2010, the Orlando Utilities Commission filed, pro forma revised tariff sheets for inclusion in its open access transmission...

  12. 76 FR 49469 - Orlando Utilities Commission; Notice of Filing

    2011-08-10

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-15-000] Orlando Utilities Commission; Notice of Filing Take notice that on July 29, 2011, Orlando Utilities Commission (OUC), pursuant to section 205 of the Federal Power Act (FPA) \\1\\ and Part 35 of the Federal Energy Regulatory...

  13. CNEA - Centro Atómico Bariloche

    en Ciencia y Tecnología Formación de Recursos Humanos de alto nivel Mapa del sitio Contacto Buscar en la formación de recursos humanos. Leer más: Centro atómico bariloche Próximos Eventos

  14. CONRRAD Project: how CNEA is managing radioactive waste knowledge

    Vetere, Claudia L.; Gomiz, Pablo R.

    2009-01-01

    The aim of this paper is to introduce CONRRAD Project, which is an initiative of the Knowledge Management Group (GesCon) belonged to the Nuclear Safety and Environment Area, for knowledge preservation of Radioactive Waste Management. It discusses the methodology and the results that have been achieved at present. (author)

  15. Description of ECRI (CNEA'S MTR fuel fabrication plant)

    Echenique, P.; Fabro, J.; Podesta, D.; Restelli, M.; Rossi, G.; Alvarez, L.; Adelfang, P.

    2002-01-01

    The ECRI Plant is dedicated to the development and fabrication of high-density fuel elements and targets for 99 Mo. In this sector had been done the start up Fuel Elements for the Reactors of Peru, Iran, Algeria and Egypt. All of them were made with U 3 O 8 . The targets for 99 Mo using HEU were fabricated too in the last years. The new material of high-density for Fuel Elements as U 3 Si 2 were done in this sector, three prototypes were fabricated, two are still under irradiation. (P06 and P07). As new developments we are working with U-Mo (7%) Fuel Plates with both material Korean and HMD. This work is under the RERTR Program and two fuel elements, manufactured by us, with both powders, will be irradiated in Petten. For 99 Mo targets, we are fabricating miniplates of LEU with an AlUx powder by pulvi-metallurgy technique. And it is under development the foils targets under the RERTR Program. A general view of the fabrication facilities and control sector will be shown. The different operations that are done in each sector will be explained. All our activities will be certified under the ISO 9000 and we are working hard to get it in the middle of 2003. (author)

  16. Leadership of healthcare commissioning networks in England: a mixed-methods study on clinical commissioning groups

    Zachariadis, Markos; Oborn, Eivor; Barrett, Michael; Zollinger-Read, Paul

    2013-01-01

    Objective To explore the relational challenges for general practitioner (GP) leaders setting up new network-centric commissioning organisations in the recent health policy reform in England, we use innovation network theory to identify key network leadership practices that facilitate healthcare innovation. Design Mixed-method, multisite and case study research. Setting Six clinical commissioning groups and local clusters in the East of England area, covering in total 208 GPs and 1 662 000 population. Methods Semistructured interviews with 56 lead GPs, practice managers and staff from the local health authorities (primary care trusts, PCT) as well as various healthcare professionals; 21 observations of clinical commissioning group (CCG) board and executive meetings; electronic survey of 58 CCG board members (these included GPs, practice managers, PCT employees, nurses and patient representatives) and subsequent social network analysis. Main outcome measures Collaborative relationships between CCG board members and stakeholders from their healthcare network; clarifying the role of GPs as network leaders; strengths and areas for development of CCGs. Results Drawing upon innovation network theory provides unique insights of the CCG leaders’ activities in establishing best practices and introducing new clinical pathways. In this context we identified three network leadership roles: managing knowledge flows, managing network coherence and managing network stability. Knowledge sharing and effective collaboration among GPs enable network stability and the alignment of CCG objectives with those of the wider health system (network coherence). Even though activities varied between commissioning groups, collaborative initiatives were common. However, there was significant variation among CCGs around the level of engagement with providers, patients and local authorities. Locality (sub) groups played an important role because they linked commissioning decisions with

  17. National Statistical Commission and Indian Official Statistics

    Author Affiliations. T J Rao1. C. R. Rao Advanced Institute of Mathematics, Statistics and Computer Science (AIMSCS) University of Hyderabad Campus Central University Post Office, Prof. C. R. Rao Road Hyderabad 500 046, AP, India.

  18. Role of the team of scientific and technical commissioning support (TSTCS) during Mochovce NPP unit 3 and 4 commissioning

    Hermansky, J.; Prachar, M.; Sedlacek, M.; Petenyi, V.

    2011-01-01

    The Team of Scientific and Technical Commissioning Support (TSTCS) shall provide an independent support for the Mochovce NPP 3 and 4 Commissioning Department during Mochovce Units 3 and 4 commissioning. This independent support will be in line with the Mochovce NPP 3 and 4 Directive 'Non-active tests and commissioning' and it will be carried out in form of professional and expert works focusing on supervision of fulfilment of requirements for nuclear safety observance. The TSTCS duty to provide for such services during NPP commissioning is specified by Slovak Regulatory Body legislation. The independent TSTCS will supervise; - fulfilment of requirements for nuclear safety during preparation and implementation of commissioning tests; -scientific and technical level of commissioning programmes, and reflection on nuclear safety requirements in commissioning programmes,- commissioning process and test results. Main standpoints of the Team activities for individual unit commissioning stages will be; - assesment of the selected programs of functional tests in installations having an impact on nuclear safety and evaluation of the results of these tests; - assesment of the programs of physics and power commissioning, - assesment of the unit preparedness before fuel loading start; - assesment of the unit preparedness for performing initial criticality and low power commissioning and power commissioning stages; - evaluation of the results of physics and power commissioning stages and sub-stages; - final evaluation of the results from implementing the physics and power commissioning stages. The paper also presents a short description of the Team scope activities, the Team organisation, and a procedure for issuing of standpoints to individual unit commissioning stages. (Authors)

  19. Science and data science.

    Blei, David M; Smyth, Padhraic

    2017-08-07

    Data science has attracted a lot of attention, promising to turn vast amounts of data into useful predictions and insights. In this article, we ask why scientists should care about data science. To answer, we discuss data science from three perspectives: statistical, computational, and human. Although each of the three is a critical component of data science, we argue that the effective combination of all three components is the essence of what data science is about.

  20. Acceptance, commissioning and quality control in radiosurgery

    Toreti, Dalila Luzia

    2009-01-01

    Stereotactic Radiosurgery is a treatment technique that uses narrow beams of radiation focused with great accuracy in a small lesion. The introduction of micro multi leaf collimators (mMLC) allows this technique to reach a higher degree of dose conformation of the target lesion allowing a smaller irradiation of critical structures and normal tissues. This paper presents the results of the acceptance tests and commissioning of a Varian 6EX linear accelerator dedicated to radiosurgery associated with the BrainLab micro multi leaf collimator installed in the Hospital das Clinicas da Faculdade de Medicina da USP (HC-FMUSP) and establish feasible quality assurance program for the services that employ this special technique. The results of the acceptance tests were satisfactory and are willing with the specifications provided by the manufacturer and the commissioning tests were within the international recommendations. The tests and measures that are part of quality control process should be specific to each treatment unit, and the need, frequency and levels of tolerance

  1. Chilean Nuclear Energy Commission dosimetric information system

    Guerrero Vallejos, Patricia Andrea

    1997-01-01

    This thesis discusses the nuclear radiation that people who work with radioactive material is exposed to and its control by the Chilean Nuclear Energy Commission. A full analysis of the System is presented with information about the Commission and the Department of Nuclear and Radiological Safety which runs the System. Ana analysis of the System is presented in order to obtain requirements. Management flow diagrams, the processes involved and current problems experienced by the users are described. A design logic is modeled producing Data Flow Diagrams (DFD). based on this physical design, or, Model of Physical Data, is prepared including tables, attributes, types of data, primary and foreign keys. A description is presented of how the System is implemented, the tools that are used and how the testing phase is carried out. The Dosimetry System meets the criteria for a Software Engineering project, where the basic cycle was used as a working methodology. The System developed supports the dosimetric control of people exposed to radioactive material. (author)

  2. Commissioning of research reactors. Safety guide

    2006-01-01

    The objective of this Safety Guide is to provide recommendations on meeting the requirements for the commissioning of research reactors on the basis of international best practices. Specifically, it provides recommendations on fulfilling the requirements established in paras 6.44 and 7.42-7.50 of International Atomic Energy Agency, Safety of Research Reactors, IAEA Safety Standards Series No. NS-R-4, IAEA, Vienna (2005) and guidance and specific and consequential recommendations relating to the recommendations presented in paras 615-621 of International Atomic Energy Agency, Safety in the Utilization and Modification of Research Reactors, Safety Series No. 35-G2, IAEA, Vienna (1994) and paras 228-229 of International Atomic Energy Agency, Safety Assessment of Research Reactors and Preparation of the Safety Analysis Report, Safety Series No. 35-G1, IAEA, Vienna (1994). This Safety Guide is intended for use by all organizations involved in commissioning for a research reactor, including the operating organization, the regulatory body and other organizations involved in the research reactor project

  3. Surrogacy: The experience of Greek commissioning women.

    Papaligoura, Zaira; Papadatou, Danai; Bellali, Thalia

    2015-12-01

    Available studies on surrogacy are extremely limited. Findings suggest that surrogacy is experienced as problem free, with a significant number of commissioning mothers maintaining contact with the surrogates over time. To explore the experiences of Greek commissioning women regarding the surrogacy arrangement and birth of a child through surrogacy. The data of this study were collected from 7 intended mothers who had either a long history of infertility or serious health problems. Interviews were tape-recorded, transcribed and analysed employing content analysis. The analysis of the women's accounts revealed three themes: (a) a shared journey, (b) the birth of a long-awaited child, and (c) the surrogacy disclosure. The surrogacy process became the women's affairs, with their partners offering backstage support. A very close bond was developed with the surrogates, characterised by daily contacts and care-giving behaviours. While this bond was abruptly discontinued after the child's birth, it was interiorised with all participants being grateful to their surrogate. The timing and content of the surrogacy disclosure to family and child(ren) were carefully chosen by participants, who avoided providing information when egg donation was involved. Findings are reassuring for women who want to parent a child through a surrogate arrangement, and suggest that the availability of counselling services may help intended mothers to cope with disclosure issues. Copyright © 2015 Australian College of Midwives. Published by Elsevier Ltd. All rights reserved.

  4. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    L. Malgeri

    2011-01-01

    As the technical interventions were finishing up and services restored at P5 we started central operations again in 2011. We started operations with a reduced shift crew, Shift leader and DCS shifter, on 24th January. We had a first mid-week global run on 2nd and 3rd February followed by cosmic data-taking between 10th and 20th February. Due to delays with cooling for the strip tracker the useful cosmic data-taking with the strip tracker was reduced to about four days. On 20th February, the LHC started beam commissioning, and cosmic data-taking with the full CMS detector was stopped. The machine availability has been much higher during the 2011 beam commissioning than during the comparable time period in 2010. This has given us few opportunities to turn on the tracker for further cosmic data-taking. Many changes and upgrades were performed during the winter shutdown. Among them was an upgrade to running the central DAQ on 64 bit. All of these upgrades have now b...

  5. President's Commission and the normal accident

    Perrow, C.

    1982-01-01

    This chapter incorporates the major points of an analysis of the accident at Three Mile Island that I prepared in September 1979. In contrast to the findings of the President's Commission (1979), I did not view the accident as the result of operator error, an inept utility, or a negligent Nuclear Regulatory Commission but as a consequence of the complexity and interdependence that characterize the system itself. I argued that the accident was inevitable-that is, that it could not have been prevented, foreseen, or quickly terminated, because it was incomprehensible. It resembled other accidents in nuclear plants and in other high risk, complex and highly interdependent operator-machine systems; none of the accidents were caused by management or operator ineptness or by poor government regulation, though these characteristics existed and should have been expected. I maintained that the accident was normal, because in complex systems there are bound to be multiple faults that cannot be avoided by planning and that operators cannot immediately comprehend

  6. Linac4 chopper line commissioning strategy

    Bellodi, G; Lombardi, A M; Posocco, P A; Sargsyan, E

    2010-01-01

    The report outlines the strategy for beam-based commissioning of the Linac4 3 MeV chopper line as currently scheduled to start in the second half of 2011 in the Test Stand Area. A dedicated temporary diagnostics test bench will complement the measurement devices foreseen for permanent installation in the chopper line. A commissioning procedure is set out as a series of consecutive phases, each one supposed to meet a well- defined milestone in the path to fully characterise the beam-line. Specific set-ups for each stage are defined in terms of beam characteristics, machine settings and diagnostics used. Operational guidelines are given and expected results at the relative points of measurements are shown for simulated scenarios (on the basis of multi-particle tracking studies carried out with the codes PATH and TRACEWin). These are then interpreted in the light of the resolution limits of the available diagnostics instruments to assess the precision reach on individual measurements and the feasibility of techn...

  7. PLEIADES-HR IMAGE QUALITY COMMISSIONING

    L. Lebègue

    2012-07-01

    Full Text Available PLEIADES is the highest resolution civilian earth observing system ever developed in Europe. This imagery program is conducted by the French National Space Agency, CNES. It operates since 2012 a first satellite PLEIADES-HR launched on 2011 December 17th, a second one should be launched by the end of the year. Each satellite is designed to provide optical 70 cm resolution coloured images to civilian and defence users. The Image Quality requirements were defined from users studies from the different spatial imaging applications, taking into account the trade-off between on-board technological complexity and ground processing capacity. The assessment of the image quality and the calibration operation have been performed by CNES Image Quality team during the 6 month commissioning phase that followed the satellite launch. These activities cover many topics gathered in two families : radiometric and geometric image quality. The new capabilities offered by PLEIADES-HR agility allowed to imagine new methods of image calibration and performance assessment. Starting from an overview of the satellite characteristics, this paper presents all the calibration operations that were conducted during the commissioning phase and also gives the main results for every image quality performance.

  8. Validation Tools for ATLAS Muon Spectrometer Commissioning

    Benekos, N.Chr.; Dedes, G.; Laporte, J.F.; Nicolaidou, R.; Ouraou, A.

    2008-01-01

    The ATLAS Muon Spectrometer (MS), currently being installed at CERN, is designed to measure final state muons of 14 TeV proton-proton interactions at the Large Hadron Collider (LHC) with a good momentum resolution of 2-3% at 10-100 GeV/c and 10% at 1 TeV, taking into account the high level background enviroment, the inhomogeneous magnetic field, and the large size of the apparatus (24 m diameter by 44 m length). The MS layout of the ATLAS detector is made of a large toroidal magnet, arrays of high-pressure drift tubes for precise tracking and dedicated fast detectors for the first-level trigger, and is organized in eight Large and eight Small sectors. All the detectors of the barrel toroid have been installed and the commissioning has started with cosmic rays. In order to validate the MS performance using cosmic events, a Muon Commissioning Validation package has been developed and its results are presented in this paper. Integration with the rest of the ATLAS sub-detectors is now being done in the ATLAS cavern

  9. 75 FR 3488 - Acadia National Park; Bar Harbor, ME; Acadia National Park Advisory Commission; Notice of Meeting

    2010-01-21

    ... established pursuant to Public Law 99-420, Sec. 103. The purpose of the commission is to consult with the Secretary of the Interior, or his designee, on matters relating to the management and development of the...: --Land Conservation. --Park Use. --Science and Education. --Historic. 2. Old business. 3. Superintendent...

  10. The Work of the International Law Commission at the beginning of the New Term: Crimes against Humanity and Other Topics

    Šturma, Pavel

    2017-01-01

    Roč. 8, nemá (2017), s. 553-562 ISSN 1805-0565. E-ISSN 1805-0999 Institutional support: RVO:68378122 Keywords : codification * International Law Commission * jus cogens Subject RIV: AG - Legal Sciences OBOR OECD: Law http://www.cyil.eu/

  11. Report of the State of Nevada Commission on Nuclear Projects

    1990-12-01

    This third biennial Report of the Nevada Commission on Nuclear Projects has been prepared in fulfillment of the requirements of NRS 459.0092, which stipulates that the Commission shall report to the Governor and Legislature on any matter relating to radioactive waste disposal the Commission deems appropriate and advise and make recommendations on the policy of the State concerning nuclear waste disposal projects. Chapter One of the Report presents a brief overview of the Commission's functions and statutory charges. It also contains a summary of developments which have affected the overall nuclear waste disposl issue since the last Commission Report was published in November, 1988. Chapter Two contains a synthesis of Commission activities and reports on the findings of the Commission relative to the geotechnical, environmental, socioeconomic, transportation, intergovernmental and legal aspects of federal and State nuclear waste program efforts

  12. Truth Commissions, Education, and Positive Peace: An Analysis of Truth Commission Final Reports (1980-2015)

    Paulson, Julia; Bellino, Michelle J.

    2017-01-01

    Transitional justice and education both occupy increasingly prominent space on the international peacebuilding agenda, though less is known about the ways they might reinforce one another to contribute towards peace. This paper presents a cross-national analysis of truth commission (TC) reports spanning 1980-2015, exploring the range of…

  13. Sadhana | Indian Academy of Sciences

    The challenges and achievements in science and technology of FBRs focusing on safety are described with the particular reference to 500 MWe capacity Prototype Fast Breeder Reactor (PFBR), being commissioned at Kalpakkam. Roadmap with comprehensive R&D for the large scale deployment of Sodium Cooled Fast ...

  14. Division B Commission 6: Astronomical Telegrams

    Yamaoka, H.; Green, D. W. E.; Samus, N. N.; Aksnes, K.; Gilmore, A. C.; Nakano, S.; Sphar, T.; Tichá, J.; Williams, G. V.

    2016-04-01

    IAU Commission 6 ``Astronomical Telegrams'' had a single business meeting during Honolulu General Assembly of the IAU. It took place on Tuesday, 11 August 2015. The meeting was attended by Hitoshi Yamaoka (President), Daniel Green (Director of the Central Bureau for Astronomical Telegrams, CBAT, via Skype), Steven Chesley (JPL), Paul Chodas (JPL), Alan Gilmore (Canterbury University), Shinjiro Kouzuma (Chukyo University), Paolo Mazzali (Co-Chair of the Supernova Working Group), Elena Pian (Scuola Normale Superiore di Pisa), Marion Schmitz (chair IAU Working Group Designations + NED), David Tholen (University of Hawaii), Jana Ticha (Klet Observatory), Milos Tichy (Klet Observatory), Giovanni Valsecchi (INAF\\slash Italy), Gareth Williams (Minor Planet Center). Apologies: Nikolai Samus (General Catalogue of Variable Stars, GCVS).

  15. COMMISSIONING AND DETECTOR PERFORMANCE GROUPS (DPG)

    D. Acosta

    Run coordination and DPG The activities of the DPGs in the last six months have included the completion of publications (and many internal notes) on the data collected during CRAFT08 exercise, continuation of these studies with CRAFT09 data, and finally the first workflows and prompt feedback on 2009 LHC beam data. The level of readiness of the DPG prompt feedback groups is quite high, as first results from the early November “beam splash” data were shown to CMS within 24 hours of the first LHC beam. Moreover, results from the first collisions at 900 GeV were presented publicly three days afterward on November 26th. The CRAFT09 cosmic data taking period provided an opportunity to commission the calibration and alignment workflows on large data samples using the same software release series intended for the first LHC data, and to demonstrate routine operation of alignment and calibration workflows under production conditions. Significantly, the "prompt calibration loop" wa...

  16. QPS Upgrade and Re-commissioning

    Denz, R

    2009-01-01

    Prior to the re-start of the Large Hadron Collider LHC in 2009 the protection system for superconducting devices QPS will be submitted to a substantial upgrade. The foreseen modifications will enhance the capability of the system in detecting problems related to the electrical interconnections between superconducting magnets as well as the detection of so-called aperture symmetric quenches in the LHC main magnets. The presentation will describe the design and implementation of the new protection layers and report on recent tests with prototype devices. It will address as well the planned steps for commissioning of the new system, possible limitations and the additional tools and procedures required to make use of its full capability. Finally the recent progress with respect to procurement, production, test and installation will be presented.

  17. Open Letter to the European Commission

    Savin, Andrej; Schwemer, Sebastian Felix

    2016-01-01

    to the information society. A key component of this acquis is the prohibition of general monitoring obligations to the benefit of providers of intermediary services. It is a means to achieve at least two central objectives: the encouragement of innovation as well as the protection of fundamental rights of all...... Internet users, namely the rights protected by Articles 8 and 11 of the European Convention of Human Rights. Yet, the proposed Copyright Directive, in particular, seems to negatively affect both the domain and effect of Article 15 of the E-commerce Directive. The signatories of this open letter therefore...... urge the European Commission to take into account the human rights dimension of Article 15 of the E-commerce Directive, as made explicit by the Court of the Justice of the European Union, and to make sure its implications are carefully examined across sectors. Authors: Sophie Stalla-Bourdillon Eleonora...

  18. ARIEL e-LINAC: Commissioning and Development

    Laxdal, R. E.; Zvyagintsev, V.

    2016-09-01

    A superconducting electron Linac (e-Linac) will be a part of the ARIEL facility for the production of radioactive ion beams (RIB) at TRIUMF. The e-Linac will consist of five 1.3GHz 9-cell cavities in three cryomodules delivering a 50MeV 10mA beam. The baseline operation will be single pass but a re-circulating ring is planned to allow either energy boost or energy recovery operation. The first stage of the accelerator which consists of two cryomodules has been successfully commissioned in 2014. The paper will discuss the superconducting radio-frequency (SRF) challenges of the accelerator. Cavities, crymodules and RF system design, preparation, and performance will be presented.

  19. Commissioning the CMS alignment and calibration framework

    Futyan, David

    2010-01-01

    The CMS experiment has developed a powerful framework to ensure the precise and prompt alignment and calibration of its components, which is a major prerequisite to achieve the optimal performance for physics analysis. The prompt alignment and calibration strategy harnesses computing resources both at the Tier-0 site and the CERN Analysis Facility (CAF) to ensure fast turnaround for updating the corresponding database payloads. An essential element is the creation of dedicated data streams concentrating the specific event information required by the various alignment and calibration workflows. The resulting low latency is required for feeding the resulting constants into the prompt reconstruction process, which is essential for achieving swift physics analysis of the LHC data. This report discusses the implementation and the computational aspects of the alignment and calibration framework. Recent commissioning campaigns with cosmic muons, beam halo and simulated data have been used to gain detailed experience with this framework, and results of this validation are reported.

  20. Commissioning the CMS Alignment and Calibration Framework

    Futyan, David

    2009-01-01

    The CMS experiment has developed a powerful framework to ensure the precise and prompt alignment and calibration of its components, which is a major prerequisite to achieve the optimal performance for physics analysis. The prompt alignment and calibration strategy harnesses computing resources both at the Tier-0 site and the CERN Analysis Facility (CAF) to ensure fast turnaround for updating the corresponding database payloads. An essential element is the creation of dedicated data streams concentrating the specific event information required by the various alignment and calibration workflows. The resulting low latency is required for feeding the resulting constants into the prompt reconstruction process, which is essential for achieving swift physics analysis of the LHC data. This report discusses the implementation and the computational aspects of the alignment and calibration framework. Recent commissioning campaigns with cosmic muons, beam halo and simulated data have been used to gain detailed experience...